S.P.=
DISTANCE
FROM 1 2 3 4 5 6 7 8 9 10
EDGE(MM)
1 1700 1680 1875 1700
2 1780 1800 1850 1775
3 1750 1800 1815 1725
4 1710 1700 1700 1825
5
AIR FLOW
SUB-TOTAL AVG CFM 1761.5625
(LPS):
S.P.=
DISTANCE
FROM 1 2 3 4 5 6 7 8 9 10
EDGE(MM)
1 3000 3275 3200 3155
5
AIR FLOW
SUB-TOTAL AVG CFM 3209.0625
(LPS):
AVERAGE VELOCITY IN RETURN BMO (MPS): AVERAGE AIR FLOW IN RETURN BMO (LPS):
(CFM) 1761.5625
REMARKS:
DRAWING SUBMITTAL
PURPOSE K&^hD /dd>
1 1 ZBP-CC-SD-M7-102 COMMUNITY CENTER - OVER ALL GROUND FLOOR PLAN - HVAC LAYOUT
2 1 ZBP-CC-SD-M7-102A COMMUNITY CENTER - OVER ALL GROUND FLOOR PLAN - HVAC LAYOUT CODE B
PART A
3 1 ZBP-CC-SD-M7-102B COMMUNITY CENTER - OVER ALL GROUND FLOOR PLAN - HVAC LAYOUT
PART B
4 1 ZBP-CC-SD-M7-102C COMMUNITY CENTER - OVER ALL GROUND FLOOR PLAN - HVAC LAYOUT
PART C
ATTACHEMENTS
Position : PM Position :
Date : 29 August 2020 Date :
FOLLOW UP IS REQUIRED BY:
Consultant's Comments Remarks
Overall GF HVAC layout is acceptable, however contractor to follow:
1. Kitchen area HVAC layout is not approved. Contractor to update the HVAC layout only for the kitchen area and submit
separately with revised calculations for review and approval.
2. Duct coming from the Unit RFT-7-2A serving the food court and the dining area has to be modified by removing the
branches serving food court and either to re-route the duct to the dining area or to be reconsidered the CFM's while doing
the kitchen load calculations.
3. Two return grills in the multi-purpose room to be extended to accommodate the additional1900 CFM's of fresh air for the
toilet areas.
4. All toilets to be negatively pressurized.
5. Grills, diffusers, VAV's and thermostat locations, quantities and sizes to be as per the approved RCP layout.
6. Follow comments in the drawing. Coordination with other disciplines is contractor's responsibility.
F-V3ME/SUB/ZBP/001- Rev. 00
GENERAL NOTES
UP
2. Duct coming from the Unit RFT-7-2A serving the food court and the dining area
STORAGE
GF.57
has to be modified by removing the branches serving food court and either to re-route
the duct to the dining area or to be reconsidered the CFM's while doing the kitchen
load calculations.
3. Two return grills in the multi-purpose room to be extended to accommodate the
additional1900 CFM's of fresh air for the toilet areas.
4. All toilets to be negatively pressurized.
5. Grills, diffusers, VAV's and thermostat locations, quantities and sizes to be as per
the approved RCP layout.
RAMP
6. Follow comments in the drawing. Coordination with other disciplines is contractor's
REMOVE THIS responsibility.
DISTRIBUTION
AND RE-ROUTE CODE B
THE DUCT
1
2
3
52
00
CC-GROUND FLOOR VAV SCHEDULE
UP
KEY PLAN
E
PART-2
FOLDING GLASS
PARTITION
FOLDING GLASS
PARTITION
PART-3
PART-1
NAME:
SIGNATURE/
DATE:
UP
1 2
ABLUTION
RESTROOM
GF.13
20-08-2020 00 ISSUED FOR APPROVAL
DATE REVISION NO. REMARKS
CLIENT
0
B 40
18
MEP CONSULTANT
ELEV
GF.02A
PROJECT MANAGEMENT & SUPERVISION
M I DD
L
E E A S
T
CONTRACTOR
Al Saad General ContractinG Limited Liability Co.
3 JOB NUMBER
2
1 2013-154
PROJECT NAME
A0 1:100 AUG.20.2020
DRAWING TITLE AND NUMBER
COMMUNITY CENTER
OVERALL GROUND FLOOR PLAN
HVAC LAYOUT
TRANSMITTAL #: DRAWING NUMBER
ZBP-V3-ALSAAD-CC-DWG-SD-MC-020 REV-0 ZBP/CC/SD/M7-102
SIZE A0 1189MM x 841MM
PROJECT : ZAHID BUSINESS PARK
DRAWING SUBMITTAL
PURPOSE K&^hD /dd>
1 1 ZBP-CC-SD--M7-R105 - REV 001 COMMUNITY CENTER - OVER ALL ROOF PLAN - HVAC LAYOUT
2 1 ZBP-CC-SD--M7-R105A - REV 001 COMMUNITY CENTER - OVER ALL ROOF PLAN - HVAC LAYOUT
ENLARGED DETAIL -A
3 1 ZBP-CC-SD--M7-R105B - REV 001 COMMUNITY CENTER - OVER ALL ROOF PLAN - HVAC LAYOUT
ENLARGED DETAIL -B
4 1 ZBP-CC-SD--M7-R105C - REV 001 COMMUNITY CENTER - OVER ALL ROOF PLAN - HVAC LAYOUT
ENLARGED DETAIL -C
ATTACHEMENTS
Position : PM Position :
Date : 13 June 2021 Date :
UP IS REQUIRED BY:
Consultant's Comments Remarks
Roof layout is acceptable, however contractor to extend HRU ducts up to 5m away from exhaust.
Coordination with other trades is contractor's responsibility.
F-V3ME/SUB/ZBP/001- Rev. 00
GENERAL NOTES
LEGENDS:
61300
EF-7-7
RTF-7-1
RFT-7-2A
RTF-7-2-2
EF-7-16 RFT-7-4
MSOU-7-1
RFT-7-2-1
RTF-7-3
RFT-7-10
MSOU-7-1
EF-7-14
EF-7-7
RFT-7-12
MSOU-7-3
52
00
RTF-7-14
16
99
66
9
00
SEE ENLARGED DETAILS
(DWG # ZBP/CC/SD/M7-105C)
CLEVEL
KEY PLAN
RTF-7-7A
8
-7-
TF
EF
-7
R
-8
FOLDING GLASS
PARTITION
FOLDING GLASS
PARTITION
8A
7-
F-
RT
RTF-7-7
-9
-7
EF
NAME:
SIGNATURE/
H
RU
DATE:
-7
-1
A Approved As Submitted D Disapproved
RTF-7-10
EF-7-11
Approved as Noted No Action Taken
B Resubmission not required E
C Resubmission required
RTF-7-10
27-12-2020 00 ISSUED FOR APPROVAL
DATE REVISION NO. REMARKS
CLIENT
EF-7-12
EF-7-10
MEP CONSULTANT
RTF-7-5
L
ROOF DECK
E E A S
RTF-7-11 @ 2ND FLOOR LEVEL T
RTF-7-6
CONTRACTOR
Al Saad General ContractinG Limited Liability Co.
2013-154
HRU-7-3 EF-7-5
PROJECT NAME
A0 1:100 13-06-2021
DRAWING TITLE AND NUMBER
COMMUNITY CENTER
OVERALL ROOF PLAN
HVAC LAYOUT
TRANSMITTAL #: DRAWING NUMBER
ZBP-V3-ALSAAD-CC-DWG-SD-MC-033 REV-01 ZBP/CC/SD/M7-R-105
SIZE A0 1189MM x 841MM
UNIT NUMBER: RFT-7-2-1
LOCATION: ROOF
S.P.=
DISTANCE
FROM 1 2 3 4 5 6 7 8 9 10
EDGE(MM)
1 1780 1800 1700 1875
2 1750 1900 1815 1800
3 1825 1900 1875 1700
4 1710 1700 1900 1825
5
AIR FLOW
SUB-TOTAL AVG CFM 1803.4375
(LPS):
S.P.=
DISTANCE
FROM 1 2 3 4 5 6 7 8 9 10
EDGE(MM)
1 3200 3175 3315 3070
5
AIR FLOW
SUB-TOTAL AVG CFM 3221.5625
(LPS):
AVERAGE VELOCITY IN RETURN BMO (MPS): AVERAGE AIR FLOW IN RETURN BMO (LPS):
(CFM) 1803.4375
REMARKS:
DRAWING SUBMITTAL
PURPOSE K&^hD /dd>
1 1 ZBP-CC-SD-M7-102 COMMUNITY CENTER - OVER ALL GROUND FLOOR PLAN - HVAC LAYOUT
2 1 ZBP-CC-SD-M7-102A COMMUNITY CENTER - OVER ALL GROUND FLOOR PLAN - HVAC LAYOUT CODE B
PART A
3 1 ZBP-CC-SD-M7-102B COMMUNITY CENTER - OVER ALL GROUND FLOOR PLAN - HVAC LAYOUT
PART B
4 1 ZBP-CC-SD-M7-102C COMMUNITY CENTER - OVER ALL GROUND FLOOR PLAN - HVAC LAYOUT
PART C
ATTACHEMENTS
Position : PM Position :
Date : 29 August 2020 Date :
FOLLOW UP IS REQUIRED BY:
Consultant's Comments Remarks
Overall GF HVAC layout is acceptable, however contractor to follow:
1. Kitchen area HVAC layout is not approved. Contractor to update the HVAC layout only for the kitchen area and submit
separately with revised calculations for review and approval.
2. Duct coming from the Unit RFT-7-2A serving the food court and the dining area has to be modified by removing the
branches serving food court and either to re-route the duct to the dining area or to be reconsidered the CFM's while doing
the kitchen load calculations.
3. Two return grills in the multi-purpose room to be extended to accommodate the additional1900 CFM's of fresh air for the
toilet areas.
4. All toilets to be negatively pressurized.
5. Grills, diffusers, VAV's and thermostat locations, quantities and sizes to be as per the approved RCP layout.
6. Follow comments in the drawing. Coordination with other disciplines is contractor's responsibility.
F-V3ME/SUB/ZBP/001- Rev. 00
GENERAL NOTES
UP
2. Duct coming from the Unit RFT-7-2A serving the food court and the dining area
STORAGE
GF.57
has to be modified by removing the branches serving food court and either to re-route
the duct to the dining area or to be reconsidered the CFM's while doing the kitchen
load calculations.
3. Two return grills in the multi-purpose room to be extended to accommodate the
additional1900 CFM's of fresh air for the toilet areas.
4. All toilets to be negatively pressurized.
5. Grills, diffusers, VAV's and thermostat locations, quantities and sizes to be as per
the approved RCP layout.
RAMP
6. Follow comments in the drawing. Coordination with other disciplines is contractor's
REMOVE THIS responsibility.
DISTRIBUTION
AND RE-ROUTE CODE B
THE DUCT
1
2
3
52
00
CC-GROUND FLOOR VAV SCHEDULE
UP
KEY PLAN
E
PART-2
FOLDING GLASS
PARTITION
FOLDING GLASS
PARTITION
PART-3
PART-1
NAME:
SIGNATURE/
DATE:
UP
1 2
ABLUTION
RESTROOM
GF.13
20-08-2020 00 ISSUED FOR APPROVAL
DATE REVISION NO. REMARKS
CLIENT
0
B 40
18
MEP CONSULTANT
ELEV
GF.02A
PROJECT MANAGEMENT & SUPERVISION
M I DD
L
E E A S
T
CONTRACTOR
Al Saad General ContractinG Limited Liability Co.
3 JOB NUMBER
2
1 2013-154
PROJECT NAME
A0 1:100 AUG.20.2020
DRAWING TITLE AND NUMBER
COMMUNITY CENTER
OVERALL GROUND FLOOR PLAN
HVAC LAYOUT
TRANSMITTAL #: DRAWING NUMBER
ZBP-V3-ALSAAD-CC-DWG-SD-MC-020 REV-0 ZBP/CC/SD/M7-102
SIZE A0 1189MM x 841MM
PROJECT : ZAHID BUSINESS PARK
DRAWING SUBMITTAL
PURPOSE K&^hD /dd>
1 1 ZBP-CC-SD--M7-R105 - REV 001 COMMUNITY CENTER - OVER ALL ROOF PLAN - HVAC LAYOUT
2 1 ZBP-CC-SD--M7-R105A - REV 001 COMMUNITY CENTER - OVER ALL ROOF PLAN - HVAC LAYOUT
ENLARGED DETAIL -A
3 1 ZBP-CC-SD--M7-R105B - REV 001 COMMUNITY CENTER - OVER ALL ROOF PLAN - HVAC LAYOUT
ENLARGED DETAIL -B
4 1 ZBP-CC-SD--M7-R105C - REV 001 COMMUNITY CENTER - OVER ALL ROOF PLAN - HVAC LAYOUT
ENLARGED DETAIL -C
ATTACHEMENTS
Position : PM Position :
Date : 13 June 2021 Date :
UP IS REQUIRED BY:
Consultant's Comments Remarks
Roof layout is acceptable, however contractor to extend HRU ducts up to 5m away from exhaust.
Coordination with other trades is contractor's responsibility.
F-V3ME/SUB/ZBP/001- Rev. 00
GENERAL NOTES
LEGENDS:
61300
EF-7-7
RTF-7-1
RFT-7-2A
RTF-7-2-2
EF-7-16 RFT-7-4
MSOU-7-1
RFT-7-2-1
RTF-7-3
RFT-7-10
MSOU-7-1
EF-7-14
EF-7-7
RFT-7-12
MSOU-7-3
52
00
RTF-7-14
16
99
66
9
00
SEE ENLARGED DETAILS
(DWG # ZBP/CC/SD/M7-105C)
CLEVEL
KEY PLAN
RTF-7-7A
8
-7-
TF
EF
-7
R
-8
FOLDING GLASS
PARTITION
FOLDING GLASS
PARTITION
8A
7-
F-
RT
RTF-7-7
-9
-7
EF
NAME:
SIGNATURE/
H
RU
DATE:
-7
-1
A Approved As Submitted D Disapproved
RTF-7-10
EF-7-11
Approved as Noted No Action Taken
B Resubmission not required E
C Resubmission required
RTF-7-10
27-12-2020 00 ISSUED FOR APPROVAL
DATE REVISION NO. REMARKS
CLIENT
EF-7-12
EF-7-10
MEP CONSULTANT
RTF-7-5
L
ROOF DECK
E E A S
RTF-7-11 @ 2ND FLOOR LEVEL T
RTF-7-6
CONTRACTOR
Al Saad General ContractinG Limited Liability Co.
2013-154
HRU-7-3 EF-7-5
PROJECT NAME
A0 1:100 13-06-2021
DRAWING TITLE AND NUMBER
COMMUNITY CENTER
OVERALL ROOF PLAN
HVAC LAYOUT
TRANSMITTAL #: DRAWING NUMBER
ZBP-V3-ALSAAD-CC-DWG-SD-MC-033 REV-01 ZBP/CC/SD/M7-R-105
SIZE A0 1189MM x 841MM
UNIT NUMBER: RFT-7-2A
S.P.=
DISTANCE
FROM 1 2 3 4 5 6 7 8 9 10
EDGE(MM)
1 2340 2500 2200 2325
2 2220 2350 2200 2300
3 2215 2220 2325 2450
4 2300 2245 2300 2210
5
AIR FLOW
SUB-TOTAL AVG CFM 2293.75
(LPS):
S.P.=
DISTANCE
FROM 1 2 3 4 5 6 7 8 9 10
EDGE(MM)
1 3785 3600 3800 3755
5
AIR FLOW
SUB-TOTAL AVG CFM 3722.8125
(LPS):
AVERAGE VELOCITY IN RETURN BMO (MPS): AVERAGE AIR FLOW IN RETURN BMO (LPS):
(CFM) 2293.75
REMARKS:
DRAWING SUBMITTAL
PURPOSE K&^hD /dd>
1 1 ZBP-CC-SD-M7-102 COMMUNITY CENTER - OVER ALL GROUND FLOOR PLAN - HVAC LAYOUT
2 1 ZBP-CC-SD-M7-102A COMMUNITY CENTER - OVER ALL GROUND FLOOR PLAN - HVAC LAYOUT CODE B
PART A
3 1 ZBP-CC-SD-M7-102B COMMUNITY CENTER - OVER ALL GROUND FLOOR PLAN - HVAC LAYOUT
PART B
4 1 ZBP-CC-SD-M7-102C COMMUNITY CENTER - OVER ALL GROUND FLOOR PLAN - HVAC LAYOUT
PART C
ATTACHEMENTS
Position : PM Position :
Date : 29 August 2020 Date :
FOLLOW UP IS REQUIRED BY:
Consultant's Comments Remarks
Overall GF HVAC layout is acceptable, however contractor to follow:
1. Kitchen area HVAC layout is not approved. Contractor to update the HVAC layout only for the kitchen area and submit
separately with revised calculations for review and approval.
2. Duct coming from the Unit RFT-7-2A serving the food court and the dining area has to be modified by removing the
branches serving food court and either to re-route the duct to the dining area or to be reconsidered the CFM's while doing
the kitchen load calculations.
3. Two return grills in the multi-purpose room to be extended to accommodate the additional1900 CFM's of fresh air for the
toilet areas.
4. All toilets to be negatively pressurized.
5. Grills, diffusers, VAV's and thermostat locations, quantities and sizes to be as per the approved RCP layout.
6. Follow comments in the drawing. Coordination with other disciplines is contractor's responsibility.
F-V3ME/SUB/ZBP/001- Rev. 00
GENERAL NOTES
UP
2. Duct coming from the Unit RFT-7-2A serving the food court and the dining area
STORAGE
GF.57
has to be modified by removing the branches serving food court and either to re-route
the duct to the dining area or to be reconsidered the CFM's while doing the kitchen
load calculations.
3. Two return grills in the multi-purpose room to be extended to accommodate the
additional1900 CFM's of fresh air for the toilet areas.
4. All toilets to be negatively pressurized.
5. Grills, diffusers, VAV's and thermostat locations, quantities and sizes to be as per
the approved RCP layout.
RAMP
6. Follow comments in the drawing. Coordination with other disciplines is contractor's
REMOVE THIS responsibility.
DISTRIBUTION
AND RE-ROUTE CODE B
THE DUCT
1
2
3
52
00
CC-GROUND FLOOR VAV SCHEDULE
UP
KEY PLAN
E
PART-2
FOLDING GLASS
PARTITION
FOLDING GLASS
PARTITION
PART-3
PART-1
NAME:
SIGNATURE/
DATE:
UP
1 2
ABLUTION
RESTROOM
GF.13
20-08-2020 00 ISSUED FOR APPROVAL
DATE REVISION NO. REMARKS
CLIENT
0
B 40
18
MEP CONSULTANT
ELEV
GF.02A
PROJECT MANAGEMENT & SUPERVISION
M I DD
L
E E A S
T
CONTRACTOR
Al Saad General ContractinG Limited Liability Co.
3 JOB NUMBER
2
1 2013-154
PROJECT NAME
A0 1:100 AUG.20.2020
DRAWING TITLE AND NUMBER
COMMUNITY CENTER
OVERALL GROUND FLOOR PLAN
HVAC LAYOUT
TRANSMITTAL #: DRAWING NUMBER
ZBP-V3-ALSAAD-CC-DWG-SD-MC-020 REV-0 ZBP/CC/SD/M7-102
SIZE A0 1189MM x 841MM
PROJECT : ZAHID BUSINESS PARK
DRAWING SUBMITTAL
PURPOSE K&^hD /dd>
1 1 ZBP-CC-SD--M7-R105 - REV 001 COMMUNITY CENTER - OVER ALL ROOF PLAN - HVAC LAYOUT
2 1 ZBP-CC-SD--M7-R105A - REV 001 COMMUNITY CENTER - OVER ALL ROOF PLAN - HVAC LAYOUT
ENLARGED DETAIL -A
3 1 ZBP-CC-SD--M7-R105B - REV 001 COMMUNITY CENTER - OVER ALL ROOF PLAN - HVAC LAYOUT
ENLARGED DETAIL -B
4 1 ZBP-CC-SD--M7-R105C - REV 001 COMMUNITY CENTER - OVER ALL ROOF PLAN - HVAC LAYOUT
ENLARGED DETAIL -C
ATTACHEMENTS
Position : PM Position :
Date : 13 June 2021 Date :
UP IS REQUIRED BY:
Consultant's Comments Remarks
Roof layout is acceptable, however contractor to extend HRU ducts up to 5m away from exhaust.
Coordination with other trades is contractor's responsibility.
F-V3ME/SUB/ZBP/001- Rev. 00
GENERAL NOTES
LEGENDS:
61300
EF-7-7
RTF-7-1
RFT-7-2A
RTF-7-2-2
EF-7-16 RFT-7-4
MSOU-7-1
RFT-7-2-1
RTF-7-3
RFT-7-10
MSOU-7-1
EF-7-14
EF-7-7
RFT-7-12
MSOU-7-3
52
00
RTF-7-14
16
99
66
9
00
SEE ENLARGED DETAILS
(DWG # ZBP/CC/SD/M7-105C)
CLEVEL
KEY PLAN
RTF-7-7A
8
-7-
TF
EF
-7
R
-8
FOLDING GLASS
PARTITION
FOLDING GLASS
PARTITION
8A
7-
F-
RT
RTF-7-7
-9
-7
EF
NAME:
SIGNATURE/
H
RU
DATE:
-7
-1
A Approved As Submitted D Disapproved
RTF-7-10
EF-7-11
Approved as Noted No Action Taken
B Resubmission not required E
C Resubmission required
RTF-7-10
27-12-2020 00 ISSUED FOR APPROVAL
DATE REVISION NO. REMARKS
CLIENT
EF-7-12
EF-7-10
MEP CONSULTANT
RTF-7-5
L
ROOF DECK
E E A S
RTF-7-11 @ 2ND FLOOR LEVEL T
RTF-7-6
CONTRACTOR
Al Saad General ContractinG Limited Liability Co.
2013-154
HRU-7-3 EF-7-5
PROJECT NAME
A0 1:100 13-06-2021
DRAWING TITLE AND NUMBER
COMMUNITY CENTER
OVERALL ROOF PLAN
HVAC LAYOUT
TRANSMITTAL #: DRAWING NUMBER
ZBP-V3-ALSAAD-CC-DWG-SD-MC-033 REV-01 ZBP/CC/SD/M7-R-105
SIZE A0 1189MM x 841MM