UNIT NUMBER: RFT-7-2-2

LOCATION: FIRST FLOOR

SERVICE: GROUND FLOOR


PROJECT: ZAHID BUSINESS PARK

FACILITY: COMMUNITY CENTRE

LEVEL : SECOND FLOOR

DUCT TRAVERSE READINGS


SYSTEM : RFT-7-2-2

DUCT:RETURN BELLMOUTH REQUIRED ACTUAL

S.P.=

ROOM TEMP= 22 C AIR FLOW= 1655 AIR FLOW= 1761.5625

TEST POINTS (CFM) (cfm)


SIZE (MM): HEIGHT: 550 4

WIDTH: 350 4 TEST POINTS VELOCITY= VELOCITY=


(M/S) (M/S)
AREA (SQ.MT): 192500

DISTANCE
FROM 1 2 3 4 5 6 7 8 9 10
EDGE(MM)
1 1700 1680 1875 1700
2 1780 1800 1850 1775
3 1750 1800 1815 1725
4 1710 1700 1700 1825
5
AIR FLOW
SUB-TOTAL AVG CFM 1761.5625
(LPS):

DUCT:SUPPLY AIR REQUIRED ACTUAL

S.P.=

ROOM TEMP= 22 C AIR FLOW= 2970 AIR FLOW= 3209.0625

TEST POINTS (CFM) (CFM)


SIZE (MM): HEIGHT: 750 4

WIDTH: 350 4 TEST POINTS VELOCITY= VELOCITY=


(M/S) (M/S)
AREA (SQ.MM): 262500

DISTANCE
FROM 1 2 3 4 5 6 7 8 9 10
EDGE(MM)
1 3000 3275 3200 3155

2 3220 3090 3100 3200

3 3210 3175 3315 3070

4 3175 3320 3455 3385

5
AIR FLOW
SUB-TOTAL AVG CFM 3209.0625
(LPS):

AVERAGE VELOCITY IN RETURN BMO (MPS): AVERAGE AIR FLOW IN RETURN BMO (LPS):
(CFM) 1761.5625

AVERAGE VELOCITY IN FRESH VD (MPS): AVERAGE AIR FLOW IN FRESH


SUPPLY
VD (LPS):
(CFM) 3209.0625

REMARKS:

PERFORMED BY : SIGNTURE : DATE :

WITHNESSED BY : SIGNTURE : DATE :


RTF-7-2 (2 NOS) SINGLE LINE DIAGRAM
PROJECT : ZAHID BUSINESS PARK

DRAWING SUBMITTAL
PURPOSE K&^hD /dd>

CIVIL STRUCTURAL ARCHITECTURAL MECHANICAL ELECTRICAL OTHERS


PROVIDED DOCUMENTS
CATALOGUES CERTIFICATES SAMPLE TECHNICAL DATA
DRAWING CALCULATIONS SPECIFICATIONS OTHERS
DOC No. Date of Submittal SUBMITTED FOR
New Request
ZBP-V3-ALSAAD-CC-DWG-SD-MC-020-REV00 29 August 2020 APPROVAL

Resub. Request YOUR INFO

Contractor's Remarks & Exceptions


DRAWING SUBMITTAL :
No. QTY DRAWING NUMBER / REV TITLE / DESCRIPTION ACTION REMARKS
Zahid Business Park Project - HQ & CC Building

1 1 ZBP-CC-SD-M7-102 COMMUNITY CENTER - OVER ALL GROUND FLOOR PLAN - HVAC LAYOUT

2 1 ZBP-CC-SD-M7-102A COMMUNITY CENTER - OVER ALL GROUND FLOOR PLAN - HVAC LAYOUT CODE B
PART A

3 1 ZBP-CC-SD-M7-102B COMMUNITY CENTER - OVER ALL GROUND FLOOR PLAN - HVAC LAYOUT
PART B

4 1 ZBP-CC-SD-M7-102C COMMUNITY CENTER - OVER ALL GROUND FLOOR PLAN - HVAC LAYOUT
PART C

ATTACHEMENTS

Submitted by Contractor: Received By: V3 M.E. Consultants


Signature: Signature:
Name : Imad Shakhshir Name :

Position : PM Position :
Date : 29 August 2020 Date :
FOLLOW UP IS REQUIRED BY:
Consultant's Comments Remarks
Overall GF HVAC layout is acceptable, however contractor to follow:
1. Kitchen area HVAC layout is not approved. Contractor to update the HVAC layout only for the kitchen area and submit
separately with revised calculations for review and approval.
2. Duct coming from the Unit RFT-7-2A serving the food court and the dining area has to be modified by removing the
branches serving food court and either to re-route the duct to the dining area or to be reconsidered the CFM's while doing
the kitchen load calculations.
3. Two return grills in the multi-purpose room to be extended to accommodate the additional1900 CFM's of fresh air for the
toilet areas.
4. All toilets to be negatively pressurized.
5. Grills, diffusers, VAV's and thermostat locations, quantities and sizes to be as per the approved RCP layout.
6. Follow comments in the drawing. Coordination with other disciplines is contractor's responsibility.

A Approved As Submitted For : V3 Middle East Consultant Company Received By:


B Approved As Noted Resubmission not required Signature: Signature:
ACTION
ACTION

C Resubmission required Name: Name :


D Disapproved Position: Position:
E No Action Taken Date : Date :

F-V3ME/SUB/ZBP/001- Rev. 00
GENERAL NOTES

Overall GF HVAC layout is acceptable, however contractor to follow:


KITCHEN AREA ON1.HOLD
Kitchen area HVAC layout is not approved. Contractor to update the HVAC layout
only for the kitchen area and submit separately with revised calculations for review
and approval.
LEGENDS:

UP
2. Duct coming from the Unit RFT-7-2A serving the food court and the dining area
STORAGE
GF.57
has to be modified by removing the branches serving food court and either to re-route
the duct to the dining area or to be reconsidered the CFM's while doing the kitchen
load calculations.
3. Two return grills in the multi-purpose room to be extended to accommodate the
additional1900 CFM's of fresh air for the toilet areas.
4. All toilets to be negatively pressurized.
5. Grills, diffusers, VAV's and thermostat locations, quantities and sizes to be as per
the approved RCP layout.
RAMP
6. Follow comments in the drawing. Coordination with other disciplines is contractor's
REMOVE THIS responsibility.
DISTRIBUTION
AND RE-ROUTE CODE B
THE DUCT
1
2
3

52
00
CC-GROUND FLOOR VAV SCHEDULE

TAG. NO. AREA SERVED FLOW (CFM)

UP

D CC-GROUND FLOOR TANSFER FAN SCHEDULE

TAG. NO. AREA SERVED FLOW (CFM)

CC-GROUND FLOOR MINI SPLIT UNIT SCHEDULE

KEY PLAN

E
PART-2
FOLDING GLASS
PARTITION

FOLDING GLASS
PARTITION

PART-3

PART-1

EXTEND THE SIZES

NAME:
SIGNATURE/
DATE:

A Approved As Submitted D Disapproved


C Approved as Noted No Action Taken
B Resubmission not required E
C Resubmission required

UP
1 2

ABLUTION
RESTROOM
GF.13
20-08-2020 00 ISSUED FOR APPROVAL
DATE REVISION NO. REMARKS

CLIENT
0
B 40
18

[T] +966 26681765


[F] +966 26681732
P.O. Box 3896 - Jeddah 21481

ARCHITECTS & INTERIORS [E] info@kaosarchitects.com

MEP CONSULTANT

ELEV
GF.02A
PROJECT MANAGEMENT & SUPERVISION
M I DD

L
E E A S
T

CONTRACTOR
Al Saad General ContractinG Limited Liability Co.

P.O. Box 13028, Jeddah 21493, Saudi Arabia


P.O. Box 16910, Riyadh 11474, Saudi Arabia

3 JOB NUMBER
2
1 2013-154
PROJECT NAME

ZAHID BUSINESS PARK

LOCATION: PLOT NUMBER


JEDDAH KSA
DESIGN BY -
7900 4550 1450 3400 3100 8000 6000 6000 8000 ARCHITECT TK
STRUCTURAL ENGINEER MF
ELECTROMECHANICAL ENGINEER RM
DRAWN: PS
CHECKED: -
DESIGN PHASE
CONSTRUCTION PHASE CP
REVISION NUMBER
REVIEW CYCLE: 000
VAV DUCT TYPICAL INSTALLATION DETAILS FORMAT SCALE DATE

A0 1:100 AUG.20.2020
DRAWING TITLE AND NUMBER
COMMUNITY CENTER
OVERALL GROUND FLOOR PLAN
HVAC LAYOUT
TRANSMITTAL #: DRAWING NUMBER
ZBP-V3-ALSAAD-CC-DWG-SD-MC-020 REV-0 ZBP/CC/SD/M7-102
SIZE A0 1189MM x 841MM
PROJECT : ZAHID BUSINESS PARK

DRAWING SUBMITTAL
PURPOSE K&^hD /dd>

CIVIL STRUCTURAL ARCHITECTURAL MECHANICAL ELECTRICAL OTHERS


PROVIDED DOCUMENTS
CATALOGUES CERTIFICATES SAMPLE TECHNICAL DATA
DRAWING CALCULATIONS SPECIFICATIONS OTHERS
DOC No. Date of Submittal SUBMITTED FOR
New Request
ZBP-V3-ALSAAD-CC-DWG-SD-MC-033-REV001 13 June 2021 APPROVAL

Resub. Request YOUR INFO

Contractor's Remarks & Exceptions


NG SUBMITTAL :
No. QTY DRAWING NUMBER / REV TITLE / DESCRIPTION ACTION REMARKS
Zahid Business Park Project - HQ & CC Building

1 1 ZBP-CC-SD--M7-R105 - REV 001 COMMUNITY CENTER - OVER ALL ROOF PLAN - HVAC LAYOUT

2 1 ZBP-CC-SD--M7-R105A - REV 001 COMMUNITY CENTER - OVER ALL ROOF PLAN - HVAC LAYOUT
ENLARGED DETAIL -A

3 1 ZBP-CC-SD--M7-R105B - REV 001 COMMUNITY CENTER - OVER ALL ROOF PLAN - HVAC LAYOUT
ENLARGED DETAIL -B

4 1 ZBP-CC-SD--M7-R105C - REV 001 COMMUNITY CENTER - OVER ALL ROOF PLAN - HVAC LAYOUT
ENLARGED DETAIL -C

ATTACHEMENTS

ted by Contractor: Received By: V3 M.E. Consultants


Signature: Signature:
Name : Imad Shakhshir Name :

Position : PM Position :
Date : 13 June 2021 Date :
UP IS REQUIRED BY:
Consultant's Comments Remarks
Roof layout is acceptable, however contractor to extend HRU ducts up to 5m away from exhaust.
Coordination with other trades is contractor's responsibility.

A Approved As Submitted For : V3 Middle East Consultant Company Received By:


B Approved As Noted Resubmission not required Signature: Signature:
ACTION
ACTION

C Resubmission required Name: Name :


D Disapproved Position: Position:
E No Action Taken Date : Date :

F-V3ME/SUB/ZBP/001- Rev. 00
GENERAL NOTES

LEGENDS:
61300

EF-7-7

RTF-7-1

RFT-7-2A

RTF-7-2-2
EF-7-16 RFT-7-4

MSOU-7-1
RFT-7-2-1
RTF-7-3
RFT-7-10

MSOU-7-1
EF-7-14

EF-7-7

RFT-7-12
MSOU-7-3

52
00
RTF-7-14

16
99
66

9
00
SEE ENLARGED DETAILS
(DWG # ZBP/CC/SD/M7-105C)

CLEVEL

KEY PLAN

RTF-7-7A
8
-7-
TF

EF
-7
R

-8
FOLDING GLASS
PARTITION

FOLDING GLASS
PARTITION

8A
7-
F-
RT
RTF-7-7
-9
-7
EF

NAME:
SIGNATURE/

H
RU
DATE:

-7
-1
A Approved As Submitted D Disapproved

RTF-7-10
EF-7-11
Approved as Noted No Action Taken
B Resubmission not required E
C Resubmission required

13-06-2021 01 ISSUED FOR APPROVAL

RTF-7-10
27-12-2020 00 ISSUED FOR APPROVAL
DATE REVISION NO. REMARKS

CLIENT

FOOTBALL / TENNIS COURT


@ 2ND FLOOR LEVEL

[T] +966 26681765


[F] +966 26681732
0 P.O. Box 3896 - Jeddah 21481
HRU-7-2 40
18 ARCHITECTS & INTERIORS [E] info@kaosarchitects.com
RTF-7-9

EF-7-12
EF-7-10
MEP CONSULTANT
RTF-7-5

PROJECT MANAGEMENT & SUPERVISION


M I D D

L
ROOF DECK

E E A S
RTF-7-11 @ 2ND FLOOR LEVEL T
RTF-7-6

CONTRACTOR
Al Saad General ContractinG Limited Liability Co.

SEE ENLARGED DETAILS


EF-7-6

P.O. Box 13028, Jeddah 21493, Saudi Arabia


(DWG # ZBP/CC/SD/M7-105B) P.O. Box 16910, Riyadh 11474, Saudi Arabia
EF-7-5A
JOB NUMBER

2013-154
HRU-7-3 EF-7-5

PROJECT NAME

ZAHID BUSINESS PARK

LOCATION: PLOT NUMBER


JEDDAH KSA
DESIGN BY -
ARCHITECT TK
STRUCTURAL ENGINEER MF
ELECTROMECHANICAL ENGINEER RM
SEE ENLARGED DETAILS DRAWN: PS
(DWG # ZBP/CC/SD/M7-105A) CHECKED: -
DESIGN PHASE
CONSTRUCTION PHASE CP
REVISION NUMBER
REVIEW CYCLE: 001
FORMAT SCALE DATE

A0 1:100 13-06-2021
DRAWING TITLE AND NUMBER
COMMUNITY CENTER
OVERALL ROOF PLAN
HVAC LAYOUT
TRANSMITTAL #: DRAWING NUMBER
ZBP-V3-ALSAAD-CC-DWG-SD-MC-033 REV-01 ZBP/CC/SD/M7-R-105
SIZE A0 1189MM x 841MM
UNIT NUMBER: RFT-7-2-1

LOCATION: ROOF

SERVICE: GROUND FLOOR


PROJECT: ZAHID BUSINESS PARK

FACILITY: COMMUNITY CENTRE

LEVEL : SECOND FLOOR

DUCT TRAVERSE READINGS


SYSTEM : RFT-7-2-1

DUCT:RETURN BELLMOUTH REQUIRED ACTUAL

S.P.=

ROOM TEMP= 22 C AIR FLOW= 1655 AIR FLOW= 1803.4375

TEST POINTS (CFM) (cfm)


SIZE (MM): HEIGHT: 550 4

WIDTH: 350 4 TEST POINTS VELOCITY= VELOCITY=


(M/S) (M/S)
AREA (SQ.MT): 192500

DISTANCE
FROM 1 2 3 4 5 6 7 8 9 10
EDGE(MM)
1 1780 1800 1700 1875
2 1750 1900 1815 1800
3 1825 1900 1875 1700
4 1710 1700 1900 1825
5
AIR FLOW
SUB-TOTAL AVG CFM 1803.4375
(LPS):

DUCT:SUPPLY AIR REQUIRED ACTUAL

S.P.=

ROOM TEMP= 22 C AIR FLOW= 2970 AIR FLOW= 3221.5625

TEST POINTS (CFM) (CFM)


SIZE (MM): HEIGHT: 750 4

WIDTH: 350 4 TEST POINTS VELOCITY= VELOCITY=


(M/S) (M/S)
AREA (SQ.MM): 262500

DISTANCE
FROM 1 2 3 4 5 6 7 8 9 10
EDGE(MM)
1 3200 3175 3315 3070

2 3300 3235 3275 3155

3 3220 3090 3075 3100

4 3175 3320 3455 3385

5
AIR FLOW
SUB-TOTAL AVG CFM 3221.5625
(LPS):

AVERAGE VELOCITY IN RETURN BMO (MPS): AVERAGE AIR FLOW IN RETURN BMO (LPS):
(CFM) 1803.4375

AVERAGE VELOCITY IN FRESH VD (MPS): AVERAGE AIR FLOW IN FRESH


SUPPLY
VD (LPS):
(CFM) 3221.5625

REMARKS:

PERFORMED BY : SIGNTURE : DATE :

WITHNESSED BY : SIGNTURE : DATE :


RTF-7-2 (2 NOS) SINGLE LINE DIAGRAM
PROJECT : ZAHID BUSINESS PARK

DRAWING SUBMITTAL
PURPOSE K&^hD /dd>

CIVIL STRUCTURAL ARCHITECTURAL MECHANICAL ELECTRICAL OTHERS


PROVIDED DOCUMENTS
CATALOGUES CERTIFICATES SAMPLE TECHNICAL DATA
DRAWING CALCULATIONS SPECIFICATIONS OTHERS
DOC No. Date of Submittal SUBMITTED FOR
New Request
ZBP-V3-ALSAAD-CC-DWG-SD-MC-020-REV00 29 August 2020 APPROVAL

Resub. Request YOUR INFO

Contractor's Remarks & Exceptions


DRAWING SUBMITTAL :
No. QTY DRAWING NUMBER / REV TITLE / DESCRIPTION ACTION REMARKS
Zahid Business Park Project - HQ & CC Building

1 1 ZBP-CC-SD-M7-102 COMMUNITY CENTER - OVER ALL GROUND FLOOR PLAN - HVAC LAYOUT

2 1 ZBP-CC-SD-M7-102A COMMUNITY CENTER - OVER ALL GROUND FLOOR PLAN - HVAC LAYOUT CODE B
PART A

3 1 ZBP-CC-SD-M7-102B COMMUNITY CENTER - OVER ALL GROUND FLOOR PLAN - HVAC LAYOUT
PART B

4 1 ZBP-CC-SD-M7-102C COMMUNITY CENTER - OVER ALL GROUND FLOOR PLAN - HVAC LAYOUT
PART C

ATTACHEMENTS

Submitted by Contractor: Received By: V3 M.E. Consultants


Signature: Signature:
Name : Imad Shakhshir Name :

Position : PM Position :
Date : 29 August 2020 Date :
FOLLOW UP IS REQUIRED BY:
Consultant's Comments Remarks
Overall GF HVAC layout is acceptable, however contractor to follow:
1. Kitchen area HVAC layout is not approved. Contractor to update the HVAC layout only for the kitchen area and submit
separately with revised calculations for review and approval.
2. Duct coming from the Unit RFT-7-2A serving the food court and the dining area has to be modified by removing the
branches serving food court and either to re-route the duct to the dining area or to be reconsidered the CFM's while doing
the kitchen load calculations.
3. Two return grills in the multi-purpose room to be extended to accommodate the additional1900 CFM's of fresh air for the
toilet areas.
4. All toilets to be negatively pressurized.
5. Grills, diffusers, VAV's and thermostat locations, quantities and sizes to be as per the approved RCP layout.
6. Follow comments in the drawing. Coordination with other disciplines is contractor's responsibility.

A Approved As Submitted For : V3 Middle East Consultant Company Received By:


B Approved As Noted Resubmission not required Signature: Signature:
ACTION
ACTION

C Resubmission required Name: Name :


D Disapproved Position: Position:
E No Action Taken Date : Date :

F-V3ME/SUB/ZBP/001- Rev. 00
GENERAL NOTES

Overall GF HVAC layout is acceptable, however contractor to follow:


KITCHEN AREA ON1.HOLD
Kitchen area HVAC layout is not approved. Contractor to update the HVAC layout
only for the kitchen area and submit separately with revised calculations for review
and approval.
LEGENDS:

UP
2. Duct coming from the Unit RFT-7-2A serving the food court and the dining area
STORAGE
GF.57
has to be modified by removing the branches serving food court and either to re-route
the duct to the dining area or to be reconsidered the CFM's while doing the kitchen
load calculations.
3. Two return grills in the multi-purpose room to be extended to accommodate the
additional1900 CFM's of fresh air for the toilet areas.
4. All toilets to be negatively pressurized.
5. Grills, diffusers, VAV's and thermostat locations, quantities and sizes to be as per
the approved RCP layout.
RAMP
6. Follow comments in the drawing. Coordination with other disciplines is contractor's
REMOVE THIS responsibility.
DISTRIBUTION
AND RE-ROUTE CODE B
THE DUCT
1
2
3

52
00
CC-GROUND FLOOR VAV SCHEDULE

TAG. NO. AREA SERVED FLOW (CFM)

UP

D CC-GROUND FLOOR TANSFER FAN SCHEDULE

TAG. NO. AREA SERVED FLOW (CFM)

CC-GROUND FLOOR MINI SPLIT UNIT SCHEDULE

KEY PLAN

E
PART-2
FOLDING GLASS
PARTITION

FOLDING GLASS
PARTITION

PART-3

PART-1

EXTEND THE SIZES

NAME:
SIGNATURE/
DATE:

A Approved As Submitted D Disapproved


C Approved as Noted No Action Taken
B Resubmission not required E
C Resubmission required

UP
1 2

ABLUTION
RESTROOM
GF.13
20-08-2020 00 ISSUED FOR APPROVAL
DATE REVISION NO. REMARKS

CLIENT
0
B 40
18

[T] +966 26681765


[F] +966 26681732
P.O. Box 3896 - Jeddah 21481

ARCHITECTS & INTERIORS [E] info@kaosarchitects.com

MEP CONSULTANT

ELEV
GF.02A
PROJECT MANAGEMENT & SUPERVISION
M I DD

L
E E A S
T

CONTRACTOR
Al Saad General ContractinG Limited Liability Co.

P.O. Box 13028, Jeddah 21493, Saudi Arabia


P.O. Box 16910, Riyadh 11474, Saudi Arabia

3 JOB NUMBER
2
1 2013-154
PROJECT NAME

ZAHID BUSINESS PARK

LOCATION: PLOT NUMBER


JEDDAH KSA
DESIGN BY -
7900 4550 1450 3400 3100 8000 6000 6000 8000 ARCHITECT TK
STRUCTURAL ENGINEER MF
ELECTROMECHANICAL ENGINEER RM
DRAWN: PS
CHECKED: -
DESIGN PHASE
CONSTRUCTION PHASE CP
REVISION NUMBER
REVIEW CYCLE: 000
VAV DUCT TYPICAL INSTALLATION DETAILS FORMAT SCALE DATE

A0 1:100 AUG.20.2020
DRAWING TITLE AND NUMBER
COMMUNITY CENTER
OVERALL GROUND FLOOR PLAN
HVAC LAYOUT
TRANSMITTAL #: DRAWING NUMBER
ZBP-V3-ALSAAD-CC-DWG-SD-MC-020 REV-0 ZBP/CC/SD/M7-102
SIZE A0 1189MM x 841MM
PROJECT : ZAHID BUSINESS PARK

DRAWING SUBMITTAL
PURPOSE K&^hD /dd>

CIVIL STRUCTURAL ARCHITECTURAL MECHANICAL ELECTRICAL OTHERS


PROVIDED DOCUMENTS
CATALOGUES CERTIFICATES SAMPLE TECHNICAL DATA
DRAWING CALCULATIONS SPECIFICATIONS OTHERS
DOC No. Date of Submittal SUBMITTED FOR
New Request
ZBP-V3-ALSAAD-CC-DWG-SD-MC-033-REV001 13 June 2021 APPROVAL

Resub. Request YOUR INFO

Contractor's Remarks & Exceptions


NG SUBMITTAL :
No. QTY DRAWING NUMBER / REV TITLE / DESCRIPTION ACTION REMARKS
Zahid Business Park Project - HQ & CC Building

1 1 ZBP-CC-SD--M7-R105 - REV 001 COMMUNITY CENTER - OVER ALL ROOF PLAN - HVAC LAYOUT

2 1 ZBP-CC-SD--M7-R105A - REV 001 COMMUNITY CENTER - OVER ALL ROOF PLAN - HVAC LAYOUT
ENLARGED DETAIL -A

3 1 ZBP-CC-SD--M7-R105B - REV 001 COMMUNITY CENTER - OVER ALL ROOF PLAN - HVAC LAYOUT
ENLARGED DETAIL -B

4 1 ZBP-CC-SD--M7-R105C - REV 001 COMMUNITY CENTER - OVER ALL ROOF PLAN - HVAC LAYOUT
ENLARGED DETAIL -C

ATTACHEMENTS

ted by Contractor: Received By: V3 M.E. Consultants


Signature: Signature:
Name : Imad Shakhshir Name :

Position : PM Position :
Date : 13 June 2021 Date :
UP IS REQUIRED BY:
Consultant's Comments Remarks
Roof layout is acceptable, however contractor to extend HRU ducts up to 5m away from exhaust.
Coordination with other trades is contractor's responsibility.

A Approved As Submitted For : V3 Middle East Consultant Company Received By:


B Approved As Noted Resubmission not required Signature: Signature:
ACTION
ACTION

C Resubmission required Name: Name :


D Disapproved Position: Position:
E No Action Taken Date : Date :

F-V3ME/SUB/ZBP/001- Rev. 00
GENERAL NOTES

LEGENDS:
61300

EF-7-7

RTF-7-1

RFT-7-2A

RTF-7-2-2
EF-7-16 RFT-7-4

MSOU-7-1
RFT-7-2-1
RTF-7-3
RFT-7-10

MSOU-7-1
EF-7-14

EF-7-7

RFT-7-12
MSOU-7-3

52
00
RTF-7-14

16
99
66

9
00
SEE ENLARGED DETAILS
(DWG # ZBP/CC/SD/M7-105C)

CLEVEL

KEY PLAN

RTF-7-7A
8
-7-
TF

EF
-7
R

-8
FOLDING GLASS
PARTITION

FOLDING GLASS
PARTITION

8A
7-
F-
RT
RTF-7-7
-9
-7
EF

NAME:
SIGNATURE/

H
RU
DATE:

-7
-1
A Approved As Submitted D Disapproved

RTF-7-10
EF-7-11
Approved as Noted No Action Taken
B Resubmission not required E
C Resubmission required

13-06-2021 01 ISSUED FOR APPROVAL

RTF-7-10
27-12-2020 00 ISSUED FOR APPROVAL
DATE REVISION NO. REMARKS

CLIENT

FOOTBALL / TENNIS COURT


@ 2ND FLOOR LEVEL

[T] +966 26681765


[F] +966 26681732
0 P.O. Box 3896 - Jeddah 21481
HRU-7-2 40
18 ARCHITECTS & INTERIORS [E] info@kaosarchitects.com
RTF-7-9

EF-7-12
EF-7-10
MEP CONSULTANT
RTF-7-5

PROJECT MANAGEMENT & SUPERVISION


M I D D

L
ROOF DECK

E E A S
RTF-7-11 @ 2ND FLOOR LEVEL T
RTF-7-6

CONTRACTOR
Al Saad General ContractinG Limited Liability Co.

SEE ENLARGED DETAILS


EF-7-6

P.O. Box 13028, Jeddah 21493, Saudi Arabia


(DWG # ZBP/CC/SD/M7-105B) P.O. Box 16910, Riyadh 11474, Saudi Arabia
EF-7-5A
JOB NUMBER

2013-154
HRU-7-3 EF-7-5

PROJECT NAME

ZAHID BUSINESS PARK

LOCATION: PLOT NUMBER


JEDDAH KSA
DESIGN BY -
ARCHITECT TK
STRUCTURAL ENGINEER MF
ELECTROMECHANICAL ENGINEER RM
SEE ENLARGED DETAILS DRAWN: PS
(DWG # ZBP/CC/SD/M7-105A) CHECKED: -
DESIGN PHASE
CONSTRUCTION PHASE CP
REVISION NUMBER
REVIEW CYCLE: 001
FORMAT SCALE DATE

A0 1:100 13-06-2021
DRAWING TITLE AND NUMBER
COMMUNITY CENTER
OVERALL ROOF PLAN
HVAC LAYOUT
TRANSMITTAL #: DRAWING NUMBER
ZBP-V3-ALSAAD-CC-DWG-SD-MC-033 REV-01 ZBP/CC/SD/M7-R-105
SIZE A0 1189MM x 841MM
UNIT NUMBER: RFT-7-2A

LOCATION: FIRST FLOOR

SERVICE: GROUND FLOOR


PROJECT: ZAHID BUSINESS PARK

FACILITY: COMMUNITY CENTRE

LEVEL : GROUND FLOOR

DUCT TRAVERSE READINGS


SYSTEM : RFT-7-2A

DUCT:RETURN BELLMOUTH REQUIRED ACTUAL

S.P.=

ROOM TEMP= 22 C AIR FLOW= 2175 AIR FLOW= 2293.75

TEST POINTS (CFM) (cfm)


SIZE (MM): HEIGHT: 650 4

WIDTH: 350 4 TEST POINTS VELOCITY= VELOCITY=


(M/S) (M/S)
AREA (SQ.MT): 227500

DISTANCE
FROM 1 2 3 4 5 6 7 8 9 10
EDGE(MM)
1 2340 2500 2200 2325
2 2220 2350 2200 2300
3 2215 2220 2325 2450
4 2300 2245 2300 2210
5
AIR FLOW
SUB-TOTAL AVG CFM 2293.75
(LPS):

DUCT:SUPPLY AIR REQUIRED ACTUAL

S.P.=

ROOM TEMP= 22 C AIR FLOW= 3553 AIR FLOW= 3722.8125

TEST POINTS (CFM) (CFM)


SIZE (MM): HEIGHT: 750 4

WIDTH: 350 4 TEST POINTS VELOCITY= VELOCITY=


(M/S) (M/S)
AREA (SQ.MM): 262500

DISTANCE
FROM 1 2 3 4 5 6 7 8 9 10
EDGE(MM)
1 3785 3600 3800 3755

2 3665 3725 3800 3875

3 3715 3700 3600 3650

4 3725 3655 3700 3815

5
AIR FLOW
SUB-TOTAL AVG CFM 3722.8125
(LPS):

AVERAGE VELOCITY IN RETURN BMO (MPS): AVERAGE AIR FLOW IN RETURN BMO (LPS):
(CFM) 2293.75

AVERAGE VELOCITY IN FRESH VD (MPS): AVERAGE AIR FLOW IN FRESH


SUPPLY
VD (LPS):
(CFM) 3722.8125

REMARKS:

PERFORMED BY : SIGNTURE : DATE :

WITHNESSED BY : SIGNTURE : DATE :


RTF-7-2 (2 NOS) SINGLE LINE DIAGRAM
PROJECT : ZAHID BUSINESS PARK

DRAWING SUBMITTAL
PURPOSE K&^hD /dd>

CIVIL STRUCTURAL ARCHITECTURAL MECHANICAL ELECTRICAL OTHERS


PROVIDED DOCUMENTS
CATALOGUES CERTIFICATES SAMPLE TECHNICAL DATA
DRAWING CALCULATIONS SPECIFICATIONS OTHERS
DOC No. Date of Submittal SUBMITTED FOR
New Request
ZBP-V3-ALSAAD-CC-DWG-SD-MC-020-REV00 29 August 2020 APPROVAL

Resub. Request YOUR INFO

Contractor's Remarks & Exceptions


DRAWING SUBMITTAL :
No. QTY DRAWING NUMBER / REV TITLE / DESCRIPTION ACTION REMARKS
Zahid Business Park Project - HQ & CC Building

1 1 ZBP-CC-SD-M7-102 COMMUNITY CENTER - OVER ALL GROUND FLOOR PLAN - HVAC LAYOUT

2 1 ZBP-CC-SD-M7-102A COMMUNITY CENTER - OVER ALL GROUND FLOOR PLAN - HVAC LAYOUT CODE B
PART A

3 1 ZBP-CC-SD-M7-102B COMMUNITY CENTER - OVER ALL GROUND FLOOR PLAN - HVAC LAYOUT
PART B

4 1 ZBP-CC-SD-M7-102C COMMUNITY CENTER - OVER ALL GROUND FLOOR PLAN - HVAC LAYOUT
PART C

ATTACHEMENTS

Submitted by Contractor: Received By: V3 M.E. Consultants


Signature: Signature:
Name : Imad Shakhshir Name :

Position : PM Position :
Date : 29 August 2020 Date :
FOLLOW UP IS REQUIRED BY:
Consultant's Comments Remarks
Overall GF HVAC layout is acceptable, however contractor to follow:
1. Kitchen area HVAC layout is not approved. Contractor to update the HVAC layout only for the kitchen area and submit
separately with revised calculations for review and approval.
2. Duct coming from the Unit RFT-7-2A serving the food court and the dining area has to be modified by removing the
branches serving food court and either to re-route the duct to the dining area or to be reconsidered the CFM's while doing
the kitchen load calculations.
3. Two return grills in the multi-purpose room to be extended to accommodate the additional1900 CFM's of fresh air for the
toilet areas.
4. All toilets to be negatively pressurized.
5. Grills, diffusers, VAV's and thermostat locations, quantities and sizes to be as per the approved RCP layout.
6. Follow comments in the drawing. Coordination with other disciplines is contractor's responsibility.

A Approved As Submitted For : V3 Middle East Consultant Company Received By:


B Approved As Noted Resubmission not required Signature: Signature:
ACTION
ACTION

C Resubmission required Name: Name :


D Disapproved Position: Position:
E No Action Taken Date : Date :

F-V3ME/SUB/ZBP/001- Rev. 00
GENERAL NOTES

Overall GF HVAC layout is acceptable, however contractor to follow:


KITCHEN AREA ON1.HOLD
Kitchen area HVAC layout is not approved. Contractor to update the HVAC layout
only for the kitchen area and submit separately with revised calculations for review
and approval.
LEGENDS:

UP
2. Duct coming from the Unit RFT-7-2A serving the food court and the dining area
STORAGE
GF.57
has to be modified by removing the branches serving food court and either to re-route
the duct to the dining area or to be reconsidered the CFM's while doing the kitchen
load calculations.
3. Two return grills in the multi-purpose room to be extended to accommodate the
additional1900 CFM's of fresh air for the toilet areas.
4. All toilets to be negatively pressurized.
5. Grills, diffusers, VAV's and thermostat locations, quantities and sizes to be as per
the approved RCP layout.
RAMP
6. Follow comments in the drawing. Coordination with other disciplines is contractor's
REMOVE THIS responsibility.
DISTRIBUTION
AND RE-ROUTE CODE B
THE DUCT
1
2
3

52
00
CC-GROUND FLOOR VAV SCHEDULE

TAG. NO. AREA SERVED FLOW (CFM)

UP

D CC-GROUND FLOOR TANSFER FAN SCHEDULE

TAG. NO. AREA SERVED FLOW (CFM)

CC-GROUND FLOOR MINI SPLIT UNIT SCHEDULE

KEY PLAN

E
PART-2
FOLDING GLASS
PARTITION

FOLDING GLASS
PARTITION

PART-3

PART-1

EXTEND THE SIZES

NAME:
SIGNATURE/
DATE:

A Approved As Submitted D Disapproved


C Approved as Noted No Action Taken
B Resubmission not required E
C Resubmission required

UP
1 2

ABLUTION
RESTROOM
GF.13
20-08-2020 00 ISSUED FOR APPROVAL
DATE REVISION NO. REMARKS

CLIENT
0
B 40
18

[T] +966 26681765


[F] +966 26681732
P.O. Box 3896 - Jeddah 21481

ARCHITECTS & INTERIORS [E] info@kaosarchitects.com

MEP CONSULTANT

ELEV
GF.02A
PROJECT MANAGEMENT & SUPERVISION
M I DD

L
E E A S
T

CONTRACTOR
Al Saad General ContractinG Limited Liability Co.

P.O. Box 13028, Jeddah 21493, Saudi Arabia


P.O. Box 16910, Riyadh 11474, Saudi Arabia

3 JOB NUMBER
2
1 2013-154
PROJECT NAME

ZAHID BUSINESS PARK

LOCATION: PLOT NUMBER


JEDDAH KSA
DESIGN BY -
7900 4550 1450 3400 3100 8000 6000 6000 8000 ARCHITECT TK
STRUCTURAL ENGINEER MF
ELECTROMECHANICAL ENGINEER RM
DRAWN: PS
CHECKED: -
DESIGN PHASE
CONSTRUCTION PHASE CP
REVISION NUMBER
REVIEW CYCLE: 000
VAV DUCT TYPICAL INSTALLATION DETAILS FORMAT SCALE DATE

A0 1:100 AUG.20.2020
DRAWING TITLE AND NUMBER
COMMUNITY CENTER
OVERALL GROUND FLOOR PLAN
HVAC LAYOUT
TRANSMITTAL #: DRAWING NUMBER
ZBP-V3-ALSAAD-CC-DWG-SD-MC-020 REV-0 ZBP/CC/SD/M7-102
SIZE A0 1189MM x 841MM
PROJECT : ZAHID BUSINESS PARK

DRAWING SUBMITTAL
PURPOSE K&^hD /dd>

CIVIL STRUCTURAL ARCHITECTURAL MECHANICAL ELECTRICAL OTHERS


PROVIDED DOCUMENTS
CATALOGUES CERTIFICATES SAMPLE TECHNICAL DATA
DRAWING CALCULATIONS SPECIFICATIONS OTHERS
DOC No. Date of Submittal SUBMITTED FOR
New Request
ZBP-V3-ALSAAD-CC-DWG-SD-MC-033-REV001 13 June 2021 APPROVAL

Resub. Request YOUR INFO

Contractor's Remarks & Exceptions


NG SUBMITTAL :
No. QTY DRAWING NUMBER / REV TITLE / DESCRIPTION ACTION REMARKS
Zahid Business Park Project - HQ & CC Building

1 1 ZBP-CC-SD--M7-R105 - REV 001 COMMUNITY CENTER - OVER ALL ROOF PLAN - HVAC LAYOUT

2 1 ZBP-CC-SD--M7-R105A - REV 001 COMMUNITY CENTER - OVER ALL ROOF PLAN - HVAC LAYOUT
ENLARGED DETAIL -A

3 1 ZBP-CC-SD--M7-R105B - REV 001 COMMUNITY CENTER - OVER ALL ROOF PLAN - HVAC LAYOUT
ENLARGED DETAIL -B

4 1 ZBP-CC-SD--M7-R105C - REV 001 COMMUNITY CENTER - OVER ALL ROOF PLAN - HVAC LAYOUT
ENLARGED DETAIL -C

ATTACHEMENTS

ted by Contractor: Received By: V3 M.E. Consultants


Signature: Signature:
Name : Imad Shakhshir Name :

Position : PM Position :
Date : 13 June 2021 Date :
UP IS REQUIRED BY:
Consultant's Comments Remarks
Roof layout is acceptable, however contractor to extend HRU ducts up to 5m away from exhaust.
Coordination with other trades is contractor's responsibility.

A Approved As Submitted For : V3 Middle East Consultant Company Received By:


B Approved As Noted Resubmission not required Signature: Signature:
ACTION
ACTION

C Resubmission required Name: Name :


D Disapproved Position: Position:
E No Action Taken Date : Date :

F-V3ME/SUB/ZBP/001- Rev. 00
GENERAL NOTES

LEGENDS:
61300

EF-7-7

RTF-7-1

RFT-7-2A

RTF-7-2-2
EF-7-16 RFT-7-4

MSOU-7-1
RFT-7-2-1
RTF-7-3
RFT-7-10

MSOU-7-1
EF-7-14

EF-7-7

RFT-7-12
MSOU-7-3

52
00
RTF-7-14

16
99
66

9
00
SEE ENLARGED DETAILS
(DWG # ZBP/CC/SD/M7-105C)

CLEVEL

KEY PLAN

RTF-7-7A
8
-7-
TF

EF
-7
R

-8
FOLDING GLASS
PARTITION

FOLDING GLASS
PARTITION

8A
7-
F-
RT
RTF-7-7
-9
-7
EF

NAME:
SIGNATURE/

H
RU
DATE:

-7
-1
A Approved As Submitted D Disapproved

RTF-7-10
EF-7-11
Approved as Noted No Action Taken
B Resubmission not required E
C Resubmission required

13-06-2021 01 ISSUED FOR APPROVAL

RTF-7-10
27-12-2020 00 ISSUED FOR APPROVAL
DATE REVISION NO. REMARKS

CLIENT

FOOTBALL / TENNIS COURT


@ 2ND FLOOR LEVEL

[T] +966 26681765


[F] +966 26681732
0 P.O. Box 3896 - Jeddah 21481
HRU-7-2 40
18 ARCHITECTS & INTERIORS [E] info@kaosarchitects.com
RTF-7-9

EF-7-12
EF-7-10
MEP CONSULTANT
RTF-7-5

PROJECT MANAGEMENT & SUPERVISION


M I D D

L
ROOF DECK

E E A S
RTF-7-11 @ 2ND FLOOR LEVEL T
RTF-7-6

CONTRACTOR
Al Saad General ContractinG Limited Liability Co.

SEE ENLARGED DETAILS


EF-7-6

P.O. Box 13028, Jeddah 21493, Saudi Arabia


(DWG # ZBP/CC/SD/M7-105B) P.O. Box 16910, Riyadh 11474, Saudi Arabia
EF-7-5A
JOB NUMBER

2013-154
HRU-7-3 EF-7-5

PROJECT NAME

ZAHID BUSINESS PARK

LOCATION: PLOT NUMBER


JEDDAH KSA
DESIGN BY -
ARCHITECT TK
STRUCTURAL ENGINEER MF
ELECTROMECHANICAL ENGINEER RM
SEE ENLARGED DETAILS DRAWN: PS
(DWG # ZBP/CC/SD/M7-105A) CHECKED: -
DESIGN PHASE
CONSTRUCTION PHASE CP
REVISION NUMBER
REVIEW CYCLE: 001
FORMAT SCALE DATE

A0 1:100 13-06-2021
DRAWING TITLE AND NUMBER
COMMUNITY CENTER
OVERALL ROOF PLAN
HVAC LAYOUT
TRANSMITTAL #: DRAWING NUMBER
ZBP-V3-ALSAAD-CC-DWG-SD-MC-033 REV-01 ZBP/CC/SD/M7-R-105
SIZE A0 1189MM x 841MM