You are on page 1of 32

SAP2000 v14.2.

2 Advanced (Analysis Build 8851/32)

File: G:\SAP\RUMAH KOS.LOG

BEGIN ANALYSIS 2022/09/18 16:09:33

RUNNING ANALYSIS WITHIN THE GUI PROCESS

USING THE ADVANCED SOLVER (PROVIDES LIMITED INSTABILITY INFORMATION)

ELEMENT FORMATION 16:09:34

LINEAR EQUATION SOLUTION 16:09:35

FORMING STIFFNESS AT ZERO (UNSTRESSED) INITIAL CONDITIONS

TOTAL NUMBER OF EQUILIBRIUM EQUATIONS = 1632

NUMBER OF NON-ZERO STIFFNESS TERMS = 25476

Page 1
NUMBER OF EIGENVALUES BELOW SHIFT = 0

LINEAR STATIC CASES 16:09:35

USING STIFFNESS AT ZERO (UNSTRESSED) INITIAL CONDITIONS

TOTAL NUMBER OF CASES TO SOLVE = 2

NUMBER OF CASES TO SOLVE PER BLOCK = 2

LINEAR STATIC CASES TO BE SOLVED:

CASE: DEAD

CASE: LIVE

ANALYSIS COMPLETE 2022/09/18 16:09:39

Page 2
SAP2000 9/18/22 16:06:50

SAP2000 v14.2.2 - File:RUMAH KOS - 3-D View - Kgf, m, C Units


SAP2000 9/18/22 16:07:40

SAP2000 v14.2.2 - File:RUMAH KOS - Frame Section Properties - Kgf, m, C Units


SAP2000 9/18/22 16:07:58

SAP2000 v14.2.2 - File:RUMAH KOS - Frame Span Loads (DEAD) (As Defined) - Kgf, m, C Units
SAP2000 9/18/22 16:08:51

SAP2000 v14.2.2 - File:RUMAH KOS - Frame Span Loads (LIVE) (As Defined) - Kgf, m, C Units
SAP2000 9/18/22 16:09:51

SAP2000 v14.2.2 - File:RUMAH KOS - Deformed Shape (DEAD) - Kgf, m, C Units


SAP2000 9/18/22 16:11:54

0,00 0,50 0,70 0,90 1,00

SAP2000 v14.2.2 - File:RUMAH KOS - Cold-Formed Steel P-M Interaction Ratios (AISI-ASD96) - N, mm, C Units
SAP2000 9/18/22 16:10:14

SAP2000 v14.2.2 - File:RUMAH KOS - Longitudinal Reinforcing Area (ACI 318-05/IBC2003) - N, mm, C Units
SAP2000 9/18/22 16:10:37

SAP2000 v14.2.2 - File:RUMAH KOS - Axial Force Diagram (COMB1) - N, mm, C Units
SAP2000 9/18/22 16:11:13

SAP2000 v14.2.2 - File:RUMAH KOS - Moment 3-3 Diagram (COMB1) - N, mm, C Units
SAP2000 9/18/22 16:11:28

SAP2000 v14.2.2 - File:RUMAH KOS - Shear Force 2-2 Diagram (COMB1) - N, mm, C Units
SAP2000 Concrete Design Project
Job Number
Engineer

ACI 318-05/IBC2003 COLUMN SECTION DESIGN Type: Sway Special Units: N, mm, C (Summary)

Element : 46 B=250,000 D=300,000 dc=67,026


Section ID : K25X30 E=23500,000 fc=25,000 Lt.Wt. Fac.=1,000
Combo ID : COMB1 L=1500,000 fy=413,685 fys=413,685
Station Loc : 0,000 RLLF=1,000

Phi(Compression-Spiral): 0,700
Phi(Compression-Tied): 0,650
Phi(Tension Controlled): 0,900
Phi(Shear): 0,750
Phi(Seismic Shear): 0,600
Phi(Joint Shear): 0,850

AXIAL FORCE & BIAXIAL MOMENT DESIGN FOR PU, M2, M3


Rebar Design Design Design Minimum Minimum
Area Pu M2 M3 M2 M3
750,000 641473,742 1950271,615 -15549323,5 14587112,90 15549323,51

AXIAL FORCE & BIAXIAL MOMENT FACTORS


Cm Delta_ns Delta_s K L
Factor Factor Factor Factor Length
Major Bending(M3) 0,400 1,000 1,000 1,000 1500,000
Minor Bending(M2) 0,400 1,000 1,000 1,000 1500,000

SHEAR DESIGN FOR V2,V3


Rebar Shear Shear Shear Shear
Av/s Vu phi*Vc phi*Vs Vp
Major Shear(V2) 0,000 21940,291 58769,462 0,000 0,000
Minor Shear(V3) 0,000 2280,180 55387,924 0,000 0,000

JOINT SHEAR DESIGN


Joint Shear Shear Shear Shear Joint
Ratio VuTop VuTot phi*Vc Area
Major Shear(V2) N/A N/A N/A N/A N/A
Minor Shear(V3) N/A N/A N/A N/A N/A

(6/5) BEAM/COLUMN CAPACITY RATIOS


Major Minor
Ratio Ratio
N/A N/A

Notes:
N/A: Not Applicable
N/C: Not Calculated
N/N: Not Needed

SAP2000 v14.2.2 - File:G:\KOS TRI SUYA\SAP\RUMAH KOS September 18, 2022 16:00
SAP2000 Concrete Design Project
Job Number
Engineer

ACI 318-05/IBC2003 COLUMN SECTION DESIGN Type: Sway Special Units: N, mm, C (Summary)

Element : 268 B=150,000 D=400,000 dc=67,026


Section ID : K15X40 E=23500,000 fc=25,000 Lt.Wt. Fac.=1,000
Combo ID : COMB1 L=1500,000 fy=413,685 fys=413,685
Station Loc : 0,000 RLLF=1,000

Phi(Compression-Spiral): 0,700
Phi(Compression-Tied): 0,650
Phi(Tension Controlled): 0,900
Phi(Shear): 0,750
Phi(Seismic Shear): 0,600
Phi(Joint Shear): 0,850

AXIAL FORCE & BIAXIAL MOMENT DESIGN FOR PU, M2, M3


Rebar Design Design Design Minimum Minimum
Area Pu M2 M3 M2 M3
600,000 142749,704 132398,938 -3888501,9 2817879,152 3888501,930

AXIAL FORCE & BIAXIAL MOMENT FACTORS


Cm Delta_ns Delta_s K L
Factor Factor Factor Factor Length
Major Bending(M3) 0,400 1,000 1,000 1,000 1500,000
Minor Bending(M2) 0,819 1,000 1,000 1,000 1500,000

SHEAR DESIGN FOR V2,V3


Rebar Shear Shear Shear Shear
Av/s Vu phi*Vc phi*Vs Vp
Major Shear(V2) 0,000 4562,014 36471,058 0,000 0,000
Minor Shear(V3) 0,000 73,096 24235,410 0,000 0,000

JOINT SHEAR DESIGN


Joint Shear Shear Shear Shear Joint
Ratio VuTop VuTot phi*Vc Area
Major Shear(V2) N/A N/A N/A N/A N/A
Minor Shear(V3) N/A N/A N/A N/A N/A

(6/5) BEAM/COLUMN CAPACITY RATIOS


Major Minor
Ratio Ratio
N/A N/A

Notes:
N/A: Not Applicable
N/C: Not Calculated
N/N: Not Needed

SAP2000 v14.2.2 - File:G:\KOS TRI SUYA\SAP\RUMAH KOS September 18, 2022 16:01
SAP2000 Concrete Design Project
Job Number
Engineer

ACI 318-05/IBC2003 COLUMN SECTION DESIGN Type: Sway Special Units: N, mm, C (Summary)

Element : 21 B=150,000 D=300,000 dc=67,026


Section ID : K15X30 E=23500,000 fc=25,000 Lt.Wt. Fac.=1,000
Combo ID : COMB1 L=3600,000 fy=413,685 fys=413,685
Station Loc : 0,000 RLLF=1,000

Phi(Compression-Spiral): 0,700
Phi(Compression-Tied): 0,650
Phi(Tension Controlled): 0,900
Phi(Shear): 0,750
Phi(Seismic Shear): 0,600
Phi(Joint Shear): 0,850

AXIAL FORCE & BIAXIAL MOMENT DESIGN FOR PU, M2, M3


Rebar Design Design Design Minimum Minimum
Area Pu M2 M3 M2 M3
450,000 97846,610 602918,365 -16377012,2 1931492,088 2371801,835

AXIAL FORCE & BIAXIAL MOMENT FACTORS


Cm Delta_ns Delta_s K L
Factor Factor Factor Factor Length
Major Bending(M3) 0,400 1,000 1,000 1,000 3600,000
Minor Bending(M2) 0,400 1,000 1,000 1,000 3600,000

SHEAR DESIGN FOR V2,V3


Rebar Shear Shear Shear Shear
Av/s Vu phi*Vc phi*Vs Vp
Major Shear(V2) 0,000 8221,779 25194,736 0,000 0,000
Minor Shear(V3) 0,000 319,387 17946,333 0,000 0,000

JOINT SHEAR DESIGN


Joint Shear Shear Shear Shear Joint
Ratio VuTop VuTot phi*Vc Area
Major Shear(V2) N/A N/A N/A N/A N/A
Minor Shear(V3) N/A N/A N/A N/A N/A

(6/5) BEAM/COLUMN CAPACITY RATIOS


Major Minor
Ratio Ratio
N/A N/A

Notes:
N/A: Not Applicable
N/C: Not Calculated
N/N: Not Needed

SAP2000 v14.2.2 - File:G:\KOS TRI SUYA\SAP\RUMAH KOS September 18, 2022 16:01
SAP2000 Concrete Design Project
Job Number
Engineer

ACI 318-05/IBC2003 BEAM SECTION DESIGN Type:Sway Special Units: N, mm, C (Summary)

Element : 133 D=300,000 B=150,000 bf=150,000


Section ID : S15X30 ds=0,000 dct=60,000 dcb=60,000
Combo ID : COMB1 E=23500,000 fc=25,000 Lt.Wt. Fac.=1,000
Station Loc : 0,000 L=4500,000 fy=413,685 fys=413,685

Phi(Bending): 0,900
Phi(Shear): 0,750
Phi(Seis Shear): 0,600
Phi(Torsion): 0,750

Design Moments, M3
Positive Negative Special Special
Moment Moment +Moment -Moment
28363424,40 -56726849, 28363424,40 -56726849,

Flexural Reinforcement for Moment, M3


Required +Moment -Moment Minimum
Rebar Rebar Rebar Rebar
Top (+2 Axis) 775,230 0,000 775,230 120,000
Bottom (-2 Axis) 430,097 350,669 430,097 120,000

Shear Reinforcement for Shear, V2


Rebar Shear Shear Shear Shear
Av/s Vu phi*Vc phi*Vs Vp
0,700 74547,542 22419,363 52128,179 0,000

Reinforcement for Torsion, T


Rebar Rebar Torsion Critical Area Perimeter
At/s Al Tu Phi*Tcr Ao Ph
0,000 0,000 128337,362 751658,131 10963,479 544,400

SAP2000 v14.2.2 - File:G:\KOS TRI SUYA\SAP\RUMAH KOS September 18, 2022 16:02
SAP2000 Concrete Design Project
Job Number
Engineer

ACI 318-05/IBC2003 BEAM SECTION DESIGN Type:Sway Special Units: N, mm, C (Summary)

Element : 283 D=400,000 B=200,000 bf=200,000


Section ID : B20X40 ds=0,000 dct=60,000 dcb=60,000
Combo ID : COMB1 E=23500,000 fc=25,000 Lt.Wt. Fac.=1,000
Station Loc : 0,000 L=2000,000 fy=413,685 fys=413,685

Phi(Bending): 0,900
Phi(Shear): 0,750
Phi(Seis Shear): 0,600
Phi(Torsion): 0,750

Design Moments, M3
Positive Negative Special Special
Moment Moment +Moment -Moment
42686742,8 -85373486, 42686742,8 -85373486,

Flexural Reinforcement for Moment, M3


Required +Moment -Moment Minimum
Rebar Rebar Rebar Rebar
Top (+2 Axis) 756,298 0,000 756,298 226,667
Bottom (-2 Axis) 355,279 355,279 0,000 226,667

Shear Reinforcement for Shear, V2


Rebar Shear Shear Shear Shear
Av/s Vu phi*Vc phi*Vs Vp
0,639 109736,139 42347,686 67388,453 0,000

Reinforcement for Torsion, T


Rebar Rebar Torsion Critical Area Perimeter
At/s Al Tu Phi*Tcr Ao Ph
0,231 206,176 4215663,079 1667126,496 29378,729 844,400

SAP2000 v14.2.2 - File:G:\KOS TRI SUYA\SAP\RUMAH KOS September 18, 2022 16:02
SAP2000 Concrete Design Project
Job Number
Engineer

ACI 318-05/IBC2003 BEAM SECTION DESIGN Type:Sway Special Units: N, mm, C (Summary)

Element : 204 D=250,000 B=150,000 bf=150,000


Section ID : B15X25 ds=0,000 dct=60,000 dcb=60,000
Combo ID : COMB1 E=23500,000 fc=25,000 Lt.Wt. Fac.=1,000
Station Loc : 0,000 L=4350,000 fy=413,685 fys=413,685

Phi(Bending): 0,900
Phi(Shear): 0,750
Phi(Seis Shear): 0,600
Phi(Torsion): 0,750

Design Moments, M3
Positive Negative Special Special
Moment Moment +Moment -Moment
12514227,55 -25028455,1 12514227,55 -25028455,1

Flexural Reinforcement for Moment, M3


Required +Moment -Moment Minimum
Rebar Rebar Rebar Rebar
Top (+2 Axis) 411,696 0,000 411,696 95,000
Bottom (-2 Axis) 189,119 189,119 0,000 95,000

Shear Reinforcement for Shear, V2


Rebar Shear Shear Shear Shear
Av/s Vu phi*Vc phi*Vs Vp
0,284 34462,545 17748,663 16713,882 0,000

Reinforcement for Torsion, T


Rebar Rebar Torsion Critical Area Perimeter
At/s Al Tu Phi*Tcr Ao Ph
0,000 0,000 433994,993 595806,638 8366,729 444,400

SAP2000 v14.2.2 - File:G:\KOS TRI SUYA\SAP\RUMAH KOS September 18, 2022 16:04
SAP2000 Concrete Design Project
Job Number
Engineer

ACI 318-05/IBC2003 BEAM SECTION DESIGN Type:Sway Special Units: N, mm, C (Summary)

Element : 499 D=250,000 B=150,000 bf=150,000


Section ID : RB15X25 ds=0,000 dct=60,000 dcb=60,000
Combo ID : COMB1 E=23500,000 fc=25,000 Lt.Wt. Fac.=1,000
Station Loc : 0,000 L=700,000 fy=413,685 fys=413,685

Phi(Bending): 0,900
Phi(Shear): 0,750
Phi(Seis Shear): 0,600
Phi(Torsion): 0,750

Design Moments, M3
Positive Negative Special Special
Moment Moment +Moment -Moment
7547088,696 -15094177,4 7547088,696 -15094177,4

Flexural Reinforcement for Moment, M3


Required +Moment -Moment Minimum
Rebar Rebar Rebar Rebar
Top (+2 Axis) 231,712 0,000 231,712 95,000
Bottom (-2 Axis) 110,887 110,887 0,000 95,000

Shear Reinforcement for Shear, V2


Rebar Shear Shear Shear Shear
Av/s Vu phi*Vc phi*Vs Vp
0,125 20905,077 17748,663 7368,772 0,000

Reinforcement for Torsion, T


Rebar Rebar Torsion Critical Area Perimeter
At/s Al Tu Phi*Tcr Ao Ph
0,000 0,000 34065,111 587743,502 8366,729 444,400

SAP2000 v14.2.2 - File:G:\KOS TRI SUYA\SAP\RUMAH KOS September 18, 2022 16:05
Perencanaan Pelat Lantai

Pembebanan pelat lantai meliputi :

Beban mati

Berat sendiri plat = 0,12 x 2400 = 288 kg/m2

Plafond + penggantung = 11+ 7 = 18 kg/m2

Spesi = 0,02 x 2200 = 44 kg/m2

Tegel keramik = 0,01 x 2400 = 24 kg/m2

WD = 374 kg/m2

Beban hidup WL = 250 kg/m2

Beban terfaktor

Wult = 1,2 WD + 1,6 WL

= (1,2 x 374) + (1,6 x 250)

= 848,8 kg/m2

dx = h - p - ½ . Øtulangan utama

= 120 - 20 – (½ . 8) = 96 mm

dy = h - p - Øx - ½Øy

= 120 - 20 - 8 - (½ . 8) = 88 mm
Ly 4,5
C = = = 1,1
Lx 4

Sehingga untuk C = 1,1

Koefisien momen :

Clx = 25 Cly = 21 Ctx = 59 Cty = 54

Momen Arah X

Mlx = Wult . Lx2 . Clx

= 0,001 .848,8 . 42. 25

= 339,52 kgm

Mtx = Wult . Lx2 . Ctx

= -0,001 .848,8 . 42. 59

= -801,267 kgm
Momen Arah Y

Mly = Wult . Lx2 . Cly

= 0,001 .848,8 . 42. 21

= 285,196 kgm

Mty = Wult . Lx2 . Cty

= -0,001 .848,8 . 42. 54

= -733,363 kgm

Penulangan arah X pada tumpuan

Mult = 801,267 kgm = 801,26.104 Nmm

Mult
Rn =
0,8 .1000 . dx 2

801,26 .10 4
=
0,8 .1000 . 96 2

= 1,086

fy
m =
0,8 . fc

400
=
0,8 . 25

= 18,823

1,4 1,4
ρmin = = = 0,0035
fy 400

0,85 . β . fc 600
ρbalance = .
fy 600  fy

0,85 .0,85 . 25 600


= .
400 600  400
= 0,0270

ρmax = 0,75 . ρbalance

= 0,75 . 0,0270

= 0,0203

1 2 . m . Rn 
ρperlu = 1  1  

m fy 

1  2 .18,823 .1,086 
= 1  1  
18,823  400 

= 0,0028

ρperlu < ρmin, maka dipakai ρmin = 0,0035

As perlu = ρ . b . d

= 0,0035 . 1000 . 96

= 336 mm2

Dipakai tulangan Ø8 – 125 (As pasang = 401,92 mm2) > 336 mm2

Penulangan arah X pada lapangan

Mult = 339,52 kgm = 339,52.104 Nmm

Mult
Rn =
0,8 .1000 . dx 2

339,52 . 10 4
=
0,8 .1000 . 96 2

= 0,460

fy
m =
0,8 . fc

400
=
0,8 . 25
= 18,823

1,4 1,4
ρmin = = = 0,0035
fy 400

0,85 . β . fc 600
ρbalance = .
fy 600  fy

0,85 .0,85 . 25 600


= .
400 600  400

= 0,0270

ρmax = 0,75 . ρbalance

= 0,75 . 0,0270

= 0,0203

1 2 . m . Rn 
ρperlu = 1  1  
m  fy 

1  2 .18,823 . 0,460 
= 1  1  

18,823  400 

= 0,0011

ρperlu < ρmin, maka dipakai ρmin = 0,0035

As perlu = ρ . b . d

= 0,0035 . 1000 . 96

= 336 mm2

Dipakai tulangan Ø8 – 125 (As pasang = 401,92 mm2) > 336 mm2
Penulangan arah Y pada tumpuan

Mult = 733,363 kgm = 733,36.104 Nmm

Mult
Rn =
0,8 . 1000 . dy 2

733,36 . 10 4
=
0,8 .1000 . 88 2

= 1,183

fy
m =
0,8 . fc

400
=
0,8 . 25

= 18,823

1,4 1,4
ρmin = = = 0,0035
fy 400

0,85 . β . fc 600
ρbalance = .
fy 600  fy

0,85 .0,85 . 25 600


= .
400 600  400

= 0,0270

ρmax = 0,75 . ρbalance

= 0,75 . 0,0270

= 0,0203

1 2 . m . Rn 
ρperlu = 1  1  

m fy 

1  2 .18,823 .1,183 
= 1  1  
18,823  400 

= 0,0030
ρperlu < ρmin, maka dipakai ρmin = 0,0035

As perlu = ρ . b . d

= 0,0035 . 1000 . 88

= 308 mm2

Dipakai tulangan Ø8 – 125 (As pasang = 401,92 mm2) > 308 mm2

Penulangan arah Y pada lapangan

Mult = 285,196 kgm = 285,19.104 Nmm

Mult
Rn =
0,8 . 1000 . dy 2

285,19 . 10 4
=
0,8 .1000 . 88 2

= 0,460

fy
m =
0,8 . fc

400
=
0,8 . 25

= 18,823

1,4 1,4
ρmin = = = 0,0035
fy 400

0,85 . β . fc 600
ρbalance = .
fy 600  fy

0,85 .0,85 . 25 600


= .
400 600  400

= 0,0270
ρmax = 0,75 . ρbalance

= 0,75 . 0,0270

= 0,0203

1 2 . m . Rn 
ρperlu = 1  1  

m fy 

1  2 .18,823 . 0,460 
= 1  1  
18,823  400 

= 0,0011

ρperlu < ρmin, maka dipakai ρmin = 0,0035

As perlu = ρ.b.d

= 0,0035 . 1000 . 88

= 308 mm2

Dipakai tulangan Ø8 – 125 (As pasang = 401,92 mm2) > 308 mm2
Pembebanan

 Beban trapesium

Beban mati

1  1  Lx  2  1  1  4 2 
. q. Lx 1 -     . 374. 4 1 -     551,276 kg/m
3  Ly   2  3  4,5  

2

Beban hidup

1  1  Lx  2  1  1  4 2 
. q. Lx 1 -     . 250. 4 1 -     368,5kg/m
2  3  Ly   2  3  4,5  

 Beban segitiga

Beban mati

1 1
. q. Lx  . 374. 4  498,67 kg/m
3 3

Beban hidup
1 1
. q. Lx  . 250. 4  333,3 kg/m
3 3

Beban tembok = 3,6 x 250 = 900 kg/m


Kondisi Beban Pertama :
- Berat tembok = 3,6x 250 = 900 kg/m
- Berat pelat segitiga = 551,276 kg/m
- Berat pelat segitiga = 368,5 kg/m
qultimate = 1,2 qd + 1,6 ql
= 1,2 (551,276) + 1,6 (368,5) + 900
= 2151,13 kg/m

Kondisi Beban Kedua :


- Berat tembok = 3,6 x 250 = 900 kg/m
- Berat pelat trapesium = 275,638 kg/m
- Berat pelat trapesium = 184,25 kg/m
qultimate = 1,2 qd + 1,6 ql
= 1,2 (275,638) + 1,6 (184,25) + 900
= 1525,56 kg/m

Sehingga dipakai beban qultimate yang terbesar ( kondisi pertama)

qL = 368,5 kg/m qD = 551,276 kg/m


PERENCANAAN PONDASI

PENENTUAN DIMENSI PONDASI


Data Perencanaan
P = 641,474 kN = 64,1474 t
M = 15,5490 kNm = 1,5549 tm
Ø = 25 ˚
Nc = 27
Nq = 13
Nɣ = 11
2
g = 4,52 t/m fy = 400
2
C = 2 t/m fc = 25
Direncanakan panjang dan lebar pondasi
L = 1m
B = 1m
150
h = 0,2 m

Tahap Perhitungan Pondasi

e = M 10
P 20
= 1,5549
64,1474
= 0,0242 m
100

B' = 1 - ( 2 x e)
= 1 - ( 2 x 0,05 )
= 0,9976 m

100

qu = c Nc ( 1+0,3 (B'/L)) + Df . g N q + 0,5 . g . B' Nq (1-(0,2B/L)


= 70,1607 + 117,5200 + 23,4612
2
= 211,1420 t/M

σ = P + M
A W
= 64,1474 + 1,5549
1 0,5625
= 64,1474 + 2,7643
2
= 66,912 t/M

q = qu
fk
= 211,1420
3
2
= 70,381 t/M

Dengan Demikian q ≥ σ dimensi pondasi aman untuk digunakan yaitu :


L = 1 m
B = 1 m
PERHITUNGAN PENULANGAN PONDASI :
Mu = 15,5490 KNm Mn = 19,4363 Nmm
Ø = 0,8
b = 100 cm = 1000 mm
d' = 5 cm = 50 mm
d = 100 mm
Rn = Mu
b x d2
= 194363
10000000
= 0,019 kg/m2
m = fy
0,85 x fc
= 400
0,85 x 25
= 20,9150
ρ min = 1,4
400
= 1,4
400
= 0,0035
ρperlu = 1 1 − 1 − 2 .𝑅𝑛
𝑚 𝑓𝑦

= 2,3233E-06

ρb = 0,85 . β . Fc . 600
fy 600 + fy

= 0,04515625 . 0,6
= 0,0271

ρmax = 0,75 . ρb
= 0,0203

syarat ρmin < ρperlu < ρmax maka dipakai = 0,0035

As perlu = ρxbxd
2
= 350 mm

2
Dipakai tulangan tarik Ø8 - 100 mm 503 mm > As = 350 mm2
2
As ' = 0,5 x As = 251,429 mm
2
Dipakai tulangan tekan Ø8 - 150 mm 335 mm > As = 251,42857 mm2

PERHITUNGAN GESER PONDASI AKIBAT KOLOM

Dimensi Kolom :
b = 300 mm
100 h = 250 mm
250 Pu = 641,474 Knm

300

100

Tebal Pondasi = 200 mm


Lapisan beton = 50 mm
Ø tulangan = 8 mm

d efektif = 200 - 50 - 8
= 142 mm

Keliling dari penampang kritis pada poer


bo = 1668 mm

B = 442 mm
Gaya geser yang bekerja pada penampang kritis
Vu = Pu x (A - B2)
A
= 641,474 x 0,98
1
= 629,258 Kn

Untuk kerja satu arah


Pu = Pu x W x G
= 273,0113344 Kn

Kuat Geser Beton


𝒇𝒄
Vc = 𝟔
x Bxd

= 52303,33333 Kn

Ø Vu = Ø Vc
= 39227,5 Kn

Maka Ø Vu > Vu
39228 > 629,258 Kn

Kontrol Geser Dua Arah


𝟐 𝒇𝒄 .𝒃𝒐 .𝒅
Vc = 1 + 𝜷𝒄 . 𝟔

= 592140 Kn

Ø Vu = Ø Vc
= 444105 Kn

Maka Ø Vu > Vu
444105 > 629,258 Kn

PERHITUNGAN MOMEN YANG TERJADI


Momen arah memanjang dan melintang

Mu = Pu x F x 0,5 F x W
= 641,474 x (d+G) x 0,5 F x W
= 641,474 x 0,46 x 0,23 x 2
= 135,736 KNm

Perhitungan Tulangan

Mu = 135,736
0,24
= 573,5190407

ρ = 0,0035

As = ρxbxd
= 350 mm2
2
Dipakai tulangan Ø8 - 100 mm 503 mm > As = 350 mm2

You might also like