CALCULATION SUMMARY

Project Name : NESTLE Project Location: RACKS EC25

Drawing No. : ACI-07 City: Lima, Peru

Design Areas
Design Area Calc. Mode Occupancy Area of Total Water Pressure @ Min. Min. Min. Calculated Hose Margin To
Name (Model) Application Source Density Pressure Flow Heads Streams Source

(ft²) (gpm) (psi) (gpm/ft²) (psi) (gpm) # (gpm) (psi)

Required
ROCIADORES EC25 Demand (HW) 833.32 1057.5 0.662 30.5 138 4 500 33.5
132.4

File: D:\PROYECTOS ORAMON\CÁLCULOS\NESTLE - 753\RACKS\RACKS EC25\PR-753-ACI-CH-005-00.tyc3


Date 12/10/2020 Copyright © 2002-2012 Tyco Fire Protection Products Page 1
HYDRAULIC CALCULATIONS
for
Job Information
Project Name : NESTLE

Contract No. : ACI-07 City: Lima, Peru

Project Location: RACKS EC25 Date: 07/10/2020

Contractor Information
Name of Contractor: P&R Arquitectos Consultores

Address: Salzillo 163 San Borja City: Lima, Perú

Phone Number: 225-0212 E-mail: contacto@pyrarquitectos.pe

Name of Designer: O. Ramón

Authority Having Jurisdiction: CGBVP

Design
Remote Area Name ROCIADORES EC25

Remote Area Location

Occupancy Classification

Density (gpm/ft²) 0.662

Area of Application (ft²) 833.32

Coverage per Sprinkler (ft²) 208.33

Number of Calculated Sprinklers 4

In-Rack Demand (gpm) 0

Special Heads

Hose Streams (gpm) 500

Total Water Required (incl. Hose Streams) (gpm) 1057.5

Required Pressure at Source (psi) 132.4

Type of System Wet

Volume - Entire System (gal) 4819.3 gal

Water Supply Information


Date DD/MM/YYYY

Location

Source W1

Notes

File: D:\PROYECTOS ORAMON\CÁLCULOS\NESTLE - 753\RACKS\RACKS EC25\PR-753-ACI-CH-005-00.tyc3


Date 12/10/2020 Copyright © 2002-2012 Tyco Fire Protection Products Page 2
Job : NESTLE Node Labels: Node Reference
Pipe Labels: Off

Diagram for Design Area : ROCIADORES EC25

File: D:\PROYECTOS ORAMON\CÁLCULOS\NESTLE - 753\RACKS\RACKS EC25\PR-753-ACI-CH-005-00.tyc3


Date 12/10/2020 Copyright © 2002-2012 Tyco Fire Protection Products Page 3
Job : NESTLE

Hydraulic Analysis for : ROCIADORES EC25


Calculation Info
Calculation Mode Demand
Hydraulic Model Hazen-Williams
Fluid Name Water @ 60F (15.6C)
Fluid Weight, (lb/ft³) N/A for Hazen-Williams calculation.
Fluid Dynamic Viscosity, (lb·s/ft²) N/A for Hazen-Williams calculation.

Water Supply Parameters

Supply 1 : W1 Flow (gpm) Pressure (psi)


0 173
2000 150
3000 114.5

Supply Analysis
Residual Available
Static Pressure Flow Total Demand Required Pressure
Node at Source Pressure Pressure
(psi) (gpm) (gpm) (psi)
(psi) (psi)
W1 173 150 2000 165.9 1057.5 132.4

Hoses
Inside Hose Flow / Standpipe Demand (gpm) 500

Outside Hose Flow (gpm) 0

Additional Outside Hose Flow (gpm)

Other (custom defined) Hose Flow (gpm) 0

Total Hose Flow (gpm) 500

Sprinklers
Ovehead Sprinkler Flow (gpm) 557.5

InRack Sprinkler Flow (gpm) 0

Other (custom defined) Sprinkler Flow (gpm) 0

Total Sprinkler Flow (gpm) 557.5

Other
Required Margin of Safety (psi) 0

W1 - Pressure (psi) 132.4

W1 - Flow (gpm) 1057.5

Demand w/o System Pump(s) N/A

File: D:\PROYECTOS ORAMON\CÁLCULOS\NESTLE - 753\RACKS\RACKS EC25\PR-753-ACI-CH-005-00.tyc3


Date 12/10/2020 Copyright © 2002-2012 Tyco Fire Protection Products Page 4
Job : NESTLE

Hydraulic Analysis for : ROCIADORES EC25

File: D:\PROYECTOS ORAMON\CÁLCULOS\NESTLE - 753\RACKS\RACKS EC25\PR-753-ACI-CH-005-00.tyc3


Date 12/10/2020 Copyright © 2002-2012 Tyco Fire Protection Products Page 5
Job : NESTLE

Hydraulic Analysis for : ROCIADORES EC25

Graph Labels
Values
Label Description
Flow (gpm) Pressure (psi)
S1 Supply point #1 - Static 0 173
S2 Supply point #2 2000 150
S3 Supply point #3 3000 114.5
D1 Elevation Pressure 0 16.9
D2 System Demand 1057.5 132.4

Curve Intersections & Safety Margins


Intersection Safety Margin
Curve Name
Pressure (psi) Flow (gpm) Pressure (psi) @ Flow (gpm)
Supply 164 1205.2 33.5 1057.5

Open Heads
Required Calculated
Head Ref. Head Type Coverage K-Factor
Density Flow Pressure Density Flow Pressure

(ft²) (gpm/psi½) (gpm/ft²) (gpm) (psi) (gpm/ft²) (gpm) (psi)

Overhead
P1 208.33 25 0.662 287.5 30.5 0.676 140.7 31.7
Sprinkler

Overhead
P2 208.33 25 0.662 287.5 30.5 0.662 138 30.5
Sprinkler

Overhead
P3 208.33 25 0.662 287.5 30.5 0.662 138 30.5
Sprinkler

Overhead
P4 208.33 25 0.662 287.5 30.5 0.676 140.8 31.7
Sprinkler

File: D:\PROYECTOS ORAMON\CÁLCULOS\NESTLE - 753\RACKS\RACKS EC25\PR-753-ACI-CH-005-00.tyc3


Date 12/10/2020 Copyright © 2002-2012 Tyco Fire Protection Products Page 6
Job name: NESTLE Sheet number:___________________

PIPE INFORMATION
Node 1 Elev 1 K-Factor 1 Flow added(q)* Nominal ID Fittings L C Factor total (Pt)
Node 2 Elev 2 K-Factor 2 Total flow (Q) Actual ID quantity x (name) = length F Pf per ft elev (Pe) NOTES
T frict (Pf)

(ft) (gpm/psi½) (gpm) (ft) (ft) (psi) (psi)


(in)
P2 25.98 25 138 40 1x(us.Tee-Br)=8 0.33 120 30.5
14 26.31 138 1.61 8 0.5758 -0.1
8.33 4.8
14 26.31 -0.9 50 8.28 120 35.1
01 26.31 137.1 2.067 0 0.1684 0
8.28 1.4
01 26.31 140.7 50 1x(us.90)=5 37.24 120 36.5
02 26.31 277.8 2.067 5 0.6231 0
42.24 26.3
02 26.31 0 65 1x(us.90)=6 32.66 120 62.8
03 58.97 277.8 2.469 6 0.2622 -14.2
38.66 10.1
03 58.97 0 65 1x(us.Tee-Br)=12 1.83 120 58.8
04 58.97 277.8 2.469 12 0.2622 0
13.83 3.6
04 58.97 -124.8 100 1x(us.90)=10 1.21 120 62.4
05 58.97 152.9 4.026 10 0.008 0
11.21 0.1
05 58.97 0 100 1x(us.90)=10 36.91 120 62.5
06 60.87 152.9 4.026 10 0.008 -0.8
46.91 0.4
06 60.87 0 100 1x(us.Tee-Br)=20 113.82 120 62.1
07 60.87 152.9 4.026 20 0.008 0
133.82 1.1
07 60.87 131.6 100 1x(us.90)=10 46.62 120 63.2
63 63.08 284.6 4.026 10 0.0253 -1
56.62 1.4
63 63.08 0 100 1x(us.Tee-Br)=20 199.59 120 63.6
18 63.08 284.6 4.026 20 0.0253 0
219.59 5.6
18 63.08 273 100 1x(us.90)=10 9.97 120 69.2
19 63.46 557.5 4.026 10 0.0881 -0.2
19.97 1.8
19 63.46 0 100 1x(us.90)=10 1.3 120 70.8
20 63.46 557.5 4.026 10 0.0881 0
11.3 1
20 63.46 0 100 1x(us.90)=10 186.88 120 71.8
21 54.11 557.5 4.026 10 0.0881 4.1
196.88 17.3
21 54.11 0 100 1x(us.90)=10 56.55 120 93.2
22 54.11 557.5 4.026 10 0.0881 0
66.55 5.9
22 54.11 0 150 1x(us.90)=14 52.14 120 99.1
23 1.97 557.5 6.065 14 0.012 22.6
66.14 0.8
23 1.97 0 250 1x(us.90)=22 1.59 120 122.4
24 1.97 557.5 10.14 22 0.001 0
23.59 0.0
24 1.97 0 250 1x(us.90)=22 17.72 120 122.5
25 19.69 557.5 10.14 22 0.001 -7.7
39.72 0.0
25 19.69 0 250 1x(us.90)=22 2.21 120 114.8
26 19.69 557.5 10.14 22 0.001 0
24.21 0.0
26 19.69 0 250 1.23 120 114.8
27 19.69 557.5 10.14 0 0.001 0
1.23 0

© 2006 National Fire Protection Association Page 7


Job name: NESTLE Sheet number:___________________

PIPE INFORMATION
Node 1 Elev 1 K-Factor 1 Flow added(q)* Nominal ID Fittings L C Factor total (Pt)
Node 2 Elev 2 K-Factor 2 Total flow (Q) Actual ID quantity x (name) = length F Pf per ft elev (Pe) NOTES
T frict (Pf)

(ft) (gpm/psi½) (gpm) (ft) (ft) (psi) (psi)


(in)
27 19.69 500 250 1x(us.90)=22 3.28 120 114.8
35 16.4 1057.5 10.14 22 0.0032 1.4
25.28 0.1
35 16.4 0 250 1x(us.90)=25.12 3.22 120 116.4
36 16.4 1057.5 10.42 25.12 0.0028 0
28.35 0.1
36 16.4 0 250 1x(us.90)=22 29.53 120 116.4
37 45.93 1057.5 10.14 22 0.0032 -12.8
51.53 0.2
37 45.93 0 250 1x(us.90)=22 3.09 120 103.8
38 45.93 1057.5 10.14 22 0.0032 0
25.09 0.1
38 45.93 0 250 1x(us.90)=25.12 10.45 120 103.9
39 56.38 1057.5 10.42 25.12 0.0028 -4.5
35.57 0.1
39 56.38 0 250 1x(us.90)=25.12 35.51 120 99.5
40 56.38 1057.5 10.42 25.12 0.0028 0
60.63 0.2
40 56.38 0 250 1x(us.90)=25.12 1.53 120 99.6
41 57.91 1057.5 10.42 25.12 0.0028 -0.7
26.65 0.1
41 57.91 0 250 1x(us.90)=25.12 35.16 120 99
42 57.91 1057.5 10.42 25.12 0.0028 0
60.28 0.2
42 57.91 0 250 1x(us.90)=25.12 1.53 120 99.2
43 56.38 1057.5 10.42 25.12 0.0028 0.7
26.65 0.1
43 56.38 0 250 1x(us.90)=25.12 26.26 120 99.9
44 56.38 1057.5 10.42 25.12 0.0028 0
51.38 0.1
44 56.38 0 250 1x(us.90)=22 5.27 120 100.1
45 56.38 1057.5 10.14 22 0.0032 0
27.27 0.1
45 56.38 0 250 1x(us.90)=22 54.41 120 100.2
46 1.97 1057.5 10.14 22 0.0032 23.6
76.41 0.2
46 1.97 0 250 1x(us.90)=22 0.99 120 124
47 1.97 1057.5 10.14 22 0.0032 0
22.99 0.1
47 1.97 0 250 1x(us.90)=25.12 299.29 120 124.1
48 1.97 1057.5 10.42 25.12 0.0028 0
324.41 0.9
48 1.97 0 250 1x(us.90)=25.12 1.31 120 125
49 0.66 1057.5 10.42 25.12 0.0028 0.6
26.43 0.1
49 0.66 0 250 1x(us.90)=25.12 3.78 120 125.6
50 0.66 1057.5 10.42 25.12 0.0028 0
28.9 0.1
50 0.66 0 250 1x(us.90)=25.12 6.1 120 125.7
51 0.66 1057.5 10.42 25.12 0.0028 0
31.22 0.1
51 0.66 0 250 1x(us.90)=25.12 1.61 120 125.8
52 0.66 1057.5 10.42 25.12 0.0028 0
26.73 0.1
52 0.66 0 250 1x(us.90)=25.12 4.59 120 125.9
53 -3.94 1057.5 10.42 25.12 0.0028 2
29.71 0.1

© 2006 National Fire Protection Association Page 8


Job name: NESTLE Sheet number:___________________

PIPE INFORMATION
Node 1 Elev 1 K-Factor 1 Flow added(q)* Nominal ID Fittings L C Factor total (Pt)
Node 2 Elev 2 K-Factor 2 Total flow (Q) Actual ID quantity x (name) = length F Pf per ft elev (Pe) NOTES
T frict (Pf)

(ft) (gpm/psi½) (gpm) (ft) (ft) (psi) (psi)


(in)
53 -3.94 0 300 79.26 150 127.9
54 -3.94 1057.5 12.75 0 0.0007 0
79.26 0.1
54 -3.94 0 300 10.31 150 128
55 -3.94 1057.5 12.75 0 0.0007 0
10.31 0
55 -3.94 0 300 24.68 150 128
56 -3.94 1057.5 12.75 0 0.0007 0
24.68 0.0
56 -3.94 0 300 10.34 150 128
57 -3.94 1057.5 12.75 0 0.0007 0
10.34 0
57 -3.94 0 300 59.5 150 128
58 -3.94 1057.5 12.75 0 0.0007 0
59.5 0.0
58 -3.94 0 300 1x(us.90)=52.82 2.23 150 128.1
59 -3.94 1057.5 12.75 52.82 0.0007 0
55.04 0.0
59 -3.94 0 250 1x(us.90)=25.12 0.66 120 128.1
60 -3.28 1057.5 10.42 25.12 0.0028 -0.3
25.78 0.1
60 -3.28 0 250 1x(us.90)=25.12 6.12 120 127.9
61 -3.28 1057.5 10.42 25.12 0.0028 0
31.24 0.1
61 -3.28 0 250 1x(us.90)=25.12 9.84 120 128
62 -13.12 1057.5 10.42 25.12 0.0028 4.3
34.96 0.1
62 -13.12 0 250 18.97 120 132.3
W1 -13.12 1057.5 10.42 0 0.0028 0
18.97 0.1
P3 25.98 25 138 40 1x(us.Tee-Br)=8 0.33 120 30.5
13 26.31 138 1.61 8 0.5759 -0.1
8.33 4.8
13 26.31 0.9 50 8.28 120 35.1
12 26.31 138.9 2.067 0 0.1727 0
8.28 1.4
12 26.31 140.8 50 1x(us.90)=5 37.23 120 36.6
11 26.31 279.7 2.067 5 0.6312 0
42.23 26.7
11 26.31 0 65 1x(us.90)=6 32.66 120 63.2
10 58.97 279.7 2.469 6 0.2656 -14.2
38.66 10.3
10 58.97 0 65 1x(us.Tee-Br)=12 1.83 120 59.3
09 58.97 279.7 2.469 12 0.2656 0
13.83 3.7
09 58.97 124.8 100 13.32 120 63
08 58.97 404.6 4.026 0 0.0486 0
13.32 0.6
08 58.97 -131.6 100 1x(us.90)=10 146.96 120 63.6
15 58.97 273 4.026 10 0.0235 0
156.96 3.7
15 58.97 0 100 1x(us.90)=10 32.64 120 67.3
16 61.1 273 4.026 10 0.0235 -0.9
42.64 1
16 61.1 0 100 1x(us.90)=10 52.63 120 67.4
17 61.1 273 4.026 10 0.0235 0
62.63 1.5

© 2006 National Fire Protection Association Page 9


Job name: NESTLE Sheet number:___________________

PIPE INFORMATION
Node 1 Elev 1 K-Factor 1 Flow added(q)* Nominal ID Fittings L C Factor total (Pt)
Node 2 Elev 2 K-Factor 2 Total flow (Q) Actual ID quantity x (name) = length F Pf per ft elev (Pe) NOTES
T frict (Pf)

(ft) (gpm/psi½) (gpm) (ft) (ft) (psi) (psi)


(in)
17 61.1 0 100 50.9 120 68.9
18 63.08 273 4.026 0 0.0235 -0.9
50.9 1.2
P1 25.98 25 140.7 40 1x(us.Tee-Br)=8 0.33 120 31.7
01 26.31 140.7 1.61 8 0.5971 -0.1
8.33 5
P4 25.98 25 140.8 40 1x(us.Tee-Br)=8 0.33 120 31.7
12 26.31 140.8 1.61 8 0.5977 -0.1
8.33 5
his1 21.33 500 100 1x(us.90)=13.17 1.23 120 111.4
33 21.33 500 4.26 13.17 0.0547 0
14.4 0.8
33 21.33 0 100 1x(us.90)=13.17 19.36 120 112.2
32 1.97 500 4.26 13.17 0.0547 8.4
32.52 1.8
32 1.97 0 250 1x(us.90)=22 2.34 120 122.4
31 1.97 500 10.14 22 0.0008 0
24.34 0.0
31 1.97 0 250 1x(us.90)=25.12 19.36 120 122.4
30 21.33 500 10.42 25.12 0.0007 -8.4
44.48 0.0
30 21.33 0 250 1x(us.90)=25.12 11.72 120 114
29 21.33 500 10.42 25.12 0.0007 0
36.84 0.0
29 21.33 0 250 1x(us.90)=25.12 1.64 120 114.1
28 19.69 500 10.42 25.12 0.0007 0.7
26.76 0.0
28 19.69 0 250 1x(us.Tee-Br)=50 4.34 120 114.8
27 19.69 500 10.14 50 0.0008 0
54.34 0.0
14 26.31 0 50 8.28 120 35.1
13 26.31 0.9 2.067 0 0.0000 0
8.28 0
04 58.97 0 100 99.29 120 62.4
09 58.97 124.8 4.026 0 0.0055 0
99.29 0.5
08 58.97 0 100 1x(us.Tee-Br)=20 36.91 120 63.6
07 60.87 131.6 4.026 20 0.0061 -0.8
56.91 0.3

* Discharge shown for flowing nodes only

© 2006 National Fire Protection Association Page 10