You are on page 1of 3

PROPOSED G+R WAREHOUSE & OFFICE FACILITY

Plot No. 5333458 and Plot No. 5333459


DIC, Dubai, UAE.

Request For Information


RFI Ref. No. BNS/DRUM/MEP/RFI/006 Date: 08.03.2024

Type of RFI Contractual / Commercial Technical

Discipline : Architectural Structural Mech. Elect. Plumbing Fire Protection. Others.

Urgency Level High Medium


Medium Normal

Requested Information:
As per the Client meeting (held on 23.02.2024) & as per revised Architectural drawing in the office area,
Kindly find the power proposal in office area as attached. Please confirm.
(This is applicable for both plots)

Attachments : Drawing Spec. Sample Catalog Others ( )


For Contractor Receipt Acknowledged by

Engg. Manager Signature …………………………………. Date: ……….. Received By : ………………………..

MEP Co-ord. Signature: ……………………………………. Date: ……….. Date : ………………………..

Project Manager Signature: ………………………………. Date: ……….. Time : ………………………..

Engineer's Response:

1. Update the power layout as per the enclosed layout.


2. Make sure each workstation to have a floor box with sockets and Rj45 outlet or separate sockets
and Rj45 outlet

For Engineer Receipt Acknowledged by Contractor

Signature : Received by :
Date :
16.03.2024 Date:

Attachments : Drawing Spec. Sample Catalog Others ( )


Distribution : Employer Project Manager Cost Management Arch. Sub Consultant Other
SPACE FOR AUTHORITY STAMP &
SIGNATURE

01 1A 1B 02 2A 03 3A 04 4A
SYMBOL DESCRIPTION

Y13-DB-WH
B13-DB-WH
B7-DB-WH
13 A SINGLE GENERAL PURPOSE SSO
13 A DUAL GENERAL PURPOSE SSO
16A INDUSTRIAL SOCKET
13A FUSED SPUR OUTLET FOR FCU KEY PLAN :

SMDB
N

DB-WH 940 DISTRIBUTION BOARD


225 SPN ISOLATOR
2160 TPN ISOLATOR
520 840 870 610 2765
Y11-DB-OFF 1415 MDB MAIN DISTRIBUTION BOARD
1385
TOILET
FLOOR BOX WITH 1 NOS 13A TWIN
150X50 MM CABLE B9-DB-OFF (WORKERS) FB1
R11-DB-OFF SOCKET AND 2 RJ45 OUTLET
TRAY @ H/L R9-DB-OFF
B11-DB-OFF FB2 FLOOR BOX WITH 2 NOS 13A TWIN
LOCKER SOCKET AND 4 RJ45 OUTLET

FB3
PRAYER ROOM ABULATION

1890
(WORKERS)

1760
TOILET(F)

1710
TOILET(M)

1580
R6-DB-OFF 20A DP FLEX OUTLET WITH

5150
R4-DB-OFF SWITCH

965

900
160
1570
FOR EF-01 General Notes :
DB-OFF 895
1350 760 2660 765 3165 765 2900 R10-DB-OFF

485
1970

FOR
12U-PANEL

1255
R8-DB-OFF
R5-DB-OFF Y6-DB-OFF B6-DB-OFF B6-DB-OFF
725 3095 1180
W/P
W/P FB1

1390 B8-DB-OFF
P ISO FOR Y8-DB-OFF
R5-DB-OFF
GE FED 3475 3835

1620
Y4-DB-OFF 520
FB2 R7-DB-OFF FB2 Y7-DB-OFF FB2 B7-DB-OFF
900
R8-DB-OFF
Y5-DB-OFF
1560

DINING AREA 05 REVISED AS PER ARCH.LAYOUT 04/03/2024

Y5-DB-OFF 04 REVISED AS PER ARCH.LAYOUT 12/02/2024

2785
FB2 FB2

2400
995 1820 03 REVISED AS PER ARCH.LAYOUT 06/11/2023
B5-DB-OFF
OFFICE BLOCK 244.77 SQ.M
980

02 REVISED AS PER ARCH.LAYOUT 16/10/2023


620

01 REVISED AS PER COMMENTS 09/10/2023

00 ISSUED FOR APPROVAL 23/08/2023

no. description date

ROM L/L T/B -GF FLOOR Revision Schedule


150X50 MM CABLE owner
DESERT RAIN UNFORM
TRAY @ L/L MANUFACTURING CO LLC

Project

PROPOSED WAREHOUSE AT DIC


ON PLOT NO:5333458
63A TP ISO FOR
32A SP ISO FOR Consultant
DESIGN INTEGRATED
PACU-01 FED FROM Architectural Engineering Consultants
OU-G-03 FED FROM 707, Clover Bay Tower, Business Bay.
P: +97 1 4 5 58 70 70 , F : +97 1 4 4 309 51 7.
W/P RYB5-SMDB-01 P.O.Box: 122752, Dubai, U.A.E
E: info@di-aec.com, W: di-aec.com

OU-G-01 OU-G-02 B12/DB-OFF MEP CONSULTANT

TEL: +971-42215451
FAX:+971-42215452
OU-G-03 P.O.BOX-127385
haida@haidaengineering.com

W/P W/P W/P


MAIN CONTRACTOR

32A SP ISO FOR


SIDRA TOWER,
OU-G-02 FED FROM PACU-01 13TH floor, Office no:1305
SHEIKH ZAYED ROAD, Dubai

Y12/DB-OFF email:info@bnsdubai.com

S P A C E 32A SP ISO FOR


F O R M E P S E R V I C E S MEP CONTRACTOR
web site : bnscontractingllc.com

RYTERNA TECHNICAL SERVICE SERVICES L.L.C


PTC BUILDING - OFFICE 114
OU-G-01 FED FROM DAMASCUS STREET
DUBAI, UAE
R12/DB-OFF Drawing Name :
OFFICE BLOCK
GROUND & ROOF FLOOR POWER LAYOUT

Project Number : File Reference :

Drawn : BC Checked: SNP

Scale : 1:50 Date : 04/03/2024

Drawing no: ELE-SD-EP-004 Revision : R5


SPACE FOR AUTHORITY STAMP &
SIGNATURE

KEY PLAN :

N
450

General Notes :

TOILET
(WORKERS)

LOCKER
(WORKERS) PRAYER ROOM ABULATION
TOILET(M) TOILET(F)

JANITOR
CABINET

750
01. Final Design Submission 09.11.2023
DINING AREA
no. description date

Revision Schedule
owner

OFFICE BLOCK 244.77 SQ.M Project

PROPOSED G+R FACTORY AT DIC


ON PLOT NO:5333458

Consultant
DESIGN INTEGRATED
Architectural Engineering Consultants
707, Clover Bay Tower, Business Bay.
P: +97 1 4 5 58 70 70 , F : +97 1 4 4 309 51 7.
P.O.Box: 122752, Dubai, U.A.E
E: info@di-aec.com, W: di-aec.com
Contractor
FUTURE DOOR
3292

.\BNS LOGO.JPG
Drawing Name :
GROUND FLOOR PLAN-OFFICE LAYOUT

Project Number : File Reference :

INTERLOCKING Drawn : JV Checked:

Scale : 1:200 Date : 24-11-2023

3100 Drawing no: AR-103 Revision : R0


18 17
NDER GROUND WATER TANK
OTAL CAPACITY - 136 m³
BB'