Professional Documents
Culture Documents
Requested Information:
As per the Client meeting (held on 23.02.2024) & as per revised Architectural drawing in the office area,
Kindly find the power proposal in office area as attached. Please confirm.
(This is applicable for both plots)
Engineer's Response:
Signature : Received by :
Date :
16.03.2024 Date:
01 1A 1B 02 2A 03 3A 04 4A
SYMBOL DESCRIPTION
Y13-DB-WH
B13-DB-WH
B7-DB-WH
13 A SINGLE GENERAL PURPOSE SSO
13 A DUAL GENERAL PURPOSE SSO
16A INDUSTRIAL SOCKET
13A FUSED SPUR OUTLET FOR FCU KEY PLAN :
SMDB
N
FB3
PRAYER ROOM ABULATION
1890
(WORKERS)
1760
TOILET(F)
1710
TOILET(M)
1580
R6-DB-OFF 20A DP FLEX OUTLET WITH
5150
R4-DB-OFF SWITCH
965
900
160
1570
FOR EF-01 General Notes :
DB-OFF 895
1350 760 2660 765 3165 765 2900 R10-DB-OFF
485
1970
FOR
12U-PANEL
1255
R8-DB-OFF
R5-DB-OFF Y6-DB-OFF B6-DB-OFF B6-DB-OFF
725 3095 1180
W/P
W/P FB1
1390 B8-DB-OFF
P ISO FOR Y8-DB-OFF
R5-DB-OFF
GE FED 3475 3835
1620
Y4-DB-OFF 520
FB2 R7-DB-OFF FB2 Y7-DB-OFF FB2 B7-DB-OFF
900
R8-DB-OFF
Y5-DB-OFF
1560
2785
FB2 FB2
2400
995 1820 03 REVISED AS PER ARCH.LAYOUT 06/11/2023
B5-DB-OFF
OFFICE BLOCK 244.77 SQ.M
980
Project
TEL: +971-42215451
FAX:+971-42215452
OU-G-03 P.O.BOX-127385
haida@haidaengineering.com
Y12/DB-OFF email:info@bnsdubai.com
KEY PLAN :
N
450
General Notes :
TOILET
(WORKERS)
LOCKER
(WORKERS) PRAYER ROOM ABULATION
TOILET(M) TOILET(F)
JANITOR
CABINET
750
01. Final Design Submission 09.11.2023
DINING AREA
no. description date
Revision Schedule
owner
Consultant
DESIGN INTEGRATED
Architectural Engineering Consultants
707, Clover Bay Tower, Business Bay.
P: +97 1 4 5 58 70 70 , F : +97 1 4 4 309 51 7.
P.O.Box: 122752, Dubai, U.A.E
E: info@di-aec.com, W: di-aec.com
Contractor
FUTURE DOOR
3292
.\BNS LOGO.JPG
Drawing Name :
GROUND FLOOR PLAN-OFFICE LAYOUT