PROJECT JUNO – PT FRISIAN FLAG INDONESIA


DOCUMENT REVIEW COMMENTS (RCOM) Form: DS-002

Subject: Shop Drawing - Detail Support Steam Pipe Area Ref.: RCOM-C02-3409
F-G-H-I Page: 1 of 1
Type of Submittal / Drawing / Report / Other (Please State):
Document
SHOP DRAWING

Originator: PT. Tatamulia Nusantara Indah Received Date: 01 February 2023


Transmittal Number: 0503/TNI BECA/JUNO/II/2023

Review & Check Status Achieved:


1. No Objection 2. No Objection 3. Revise and 4. Rejected 5. Other
(Proceed Subject to Resubmit See Comments
with Use) Comments
(Proceed, but comments
must be addressed)
General Comments:
Address all comments, discuss with engineers if any queries.

Item Specific Comments:

Item Discipline Team Leader Comment Reviewed & Checked By


Name: Berman N
Signed:

Date: 02.02.2023

Item Reviewer / Checker Comment (if required) Reviewed & Checked By


PGL Support position follow isometric drawing Name: Rike Siswoyo

Signed:

Date: 02.02.2023
Item Site Lead Engineer Comment Site Lead Engineer
Name:

Signed:

Date:

Item Project Manager Comment Project Manager


Name:

Signed:

Date:

Copies: 1. Originator of Submittal 2. Project Manager/The Client 3. Relevant Reviewer


5. Reviewer’s Topic File 4. Document Control Master File

FORM-DS-002 RCOM Printed: 01-Feb-2023


KEY PLAN
Legend

36671
4160 4000 4000 4000 4000 4000 4000 4000 2937 1572

ELv. +17.000

2081
E1 E2 E3 E4 E5
250-STM-CS3 (1 : 63)
ELv. +14.919 250-STM-CS3 (1 : 63) ELv. +14.953
250-STM-CS3 (1 : 63)

640

579

517

455

394

331

271

209
100
46.350m
(T.O.S)

2350
12958

6612

100
44.000m
3142 6766 3051 (T.O.S)

8416
ELv. +10.397

3200
2002

PRA E1
250-STM-CS3 (1 : 50)
ELv. +8.395 40.800m ELv. +8.307
(T.O.C)
808

761
RL+39.650m
1250

No. Catatan & Revisi Tanggal


No. Note & Revisions Date
RL+38.400m

PT:12 PT:12 PT:12 Nama Proyek :


G01
G02

PT:12 Project Name :

PROJECT JUNO
1900

3752

RL+36.500m GREENFIELD FACTORY


7150
1450

Pemberi Tugas :
RL+35.050m
CHILLER ROOM WATER TREATMENT Owner :
1050

PT:12
RL+34.000m
PT:12 PLAN ROOM PT:12 FRISIAN FLAG
3295

PT:12
1050

INDONESIA
RL+32.950m
450

RL+32.500m

Manajemen Konstruksi :
Construction Management :

4099

300-STM-CS3 (1 : 101)
ELv. +20.358

3118
35749 1090 3065 E12 E13
2098 3800 3800
Kontraktor Utama :
2937 1572 3500 4000 4000 4000 4000 4000 4000 4000 4247 1090 2254 811 Main Contractor

6054
300-STM-CS3 (1 : 51)
ELv. +17.203

702

612
E7 E8 E9 E10 E11 E12
E5 E6 PT. TATAMULIA NUSANTARA INDAH
250-STM-CS3 (1 : 54) T.REDUCER www.tatamulia.co.id
ELv. +14.953 250-STM-CS3 (1 : 54) 250 X 400 X 300 SAPTA MULIA CENTER ; Jl.Rawa Gelam V, Kav.OR-3B
250-STM-CS3 (1 : 54) 300-STM-CS3 (1 : 96) Kawasan Industri Pulogadung, Jakarta Timur 13930
Tel. 021-4606960, Fax. 021-4606962 ; Email : tatajkt@cbn.net.id
ELv. +14.357 ELv. +14.357
763

688

613

613

462

387

311

236
209

34
Konsultan Pengawas :
Supervisor Consultant

Sub. Kontraktor :
Sub. Contractor
8416

CONTRACTOR SUBMISSION REVIEW Judul Gambar


Drawing Title

PROPOSE ELEVATION
Review does not constitute acceptance or approval of design AND POSITION SUPPORT
details, calculations, analyses, test method or materials PIPE STEAM ( F, G, H, I, J )
developed or selected by the contractor and does not relieve the
ELv. +6.537 contractor from compliance with contractual obligation. Digambar Diperiksa Disetujui Skala
01 FEB. 2023 Drawn Checked Approved Scale

1. No Exceptions Taken KF Saut Krisna/Hari


A3
Tanggal Tanggal Tanggal
Date Date Date
2. Not suitable for Construction. Incorporate Changes
Indicated Prior to Proceeding.
No. Lembar No Gambar Revisi
Drawing Page Drawing No. Revision

3. Not Suitable for Construction. Review and resubmit. MEP-UT-CO2-3100-CON R0

4. Review Not Required. Kode Gambar


Drawing Code
Job.: Juno Project FFI PROCESS PIPE RACK
By: RS982 Date: 02-02-2023 FOR APPROVAL Forcon Ref :

Beca CAD Ref.


KEY PLAN
Legend

300-STM-CS3 (1 : 101)
3118

E12 E13 26338 U0.5 U0.4 U0.3 U0.3' 28051 U0.2


2098 3800 3800 3800 3800 3800 3800 1447 2149 1604 3385 4000 4000 4000 4000 4000 922
100-STM-CS3 U0.2' U0.1 U0.1'
300-STM-CS3 (1 : 51) ELv. +17.392 ELv. +17.392
ELv. +17.203 300-STM-CS3 (1 : 51)
300-STM-CS3 (1 : 51) 300-STM-CS3 (1 : 39)
300-STM-CS3 (1 : 39)
300-STM-CS3 (1 : 39)

876

754
702

634
612

549

538
457

419
386

297
294

227

214
E12

ELv. +14.357

No. Catatan & Revisi Tanggal


No. Note & Revisions Date

Nama Proyek :
Project Name :

U5
PROJECT JUNO
U4 U4' U4" U5' U6 U6' U7 U7'
8014 26665 27661 GREENFIELD FACTORY
4000 922 3077 4000 937 3087 4000 4000 4000 4000 4000 3578 4399 2910 1090 4000 4000 4000
U0.1' U1 U1' U2 U2' U3 U3' U4 T-REDC
300 X 200 Pemberi Tugas :
ELv. +17.392 ELv. +17.392 Owner :
300-STM-CS3
300-STM-CS3 (1 : 37) 300-STM-CS3 (1 : 38) 300-STM-CS3 (1 : 38)
300-STM-CS3 (1 : 37) 300-STM-CS3 (1 : 38)
300-STM-CS3 (1 : 37)
942

942

850

819
734

707
FRISIAN FLAG

595
697

484
581

403

348
287
214

INDONESIA

Manajemen Konstruksi :
Construction Management :

31720
U7 U7' U8 U8' U9 Kontraktor Utama :
Main Contractor
4757 4000 4000 4000 4000 4000 4000 2963
4000 4000 3262 U10 U10' U11 U11' U12 U12'
1018 4000 U13 U13' U14.1
CONC. REDUCER
U9'
300 X 200 4000 4000
ELv. +17.392 ELv. +17.372
200-STM-CS3 (1 : 44) 200-STM-CS3 (1 : 39)
200-STM-CS3 (1 : 44)
300-STM-CS3 (1 : 38) 200-STM-CS3 (1 : 44) 200-STM-CS3 (1 : 39) PT. TATAMULIA NUSANTARA INDAH

994
200-STM-CS3 (1 : 44)

887
824

300-STM-CS3 (1 : 38) www.tatamulia.co.id

780
731

672
638

545
484

452

452
348

SAPTA MULIA CENTER ; Jl.Rawa Gelam V, Kav.OR-3B


237

266
Kawasan Industri Pulogadung, Jakarta Timur 13930
Tel. 021-4606960, Fax. 021-4606962 ; Email : tatajkt@cbn.net.id

Konsultan Pengawas :
Supervisor Consultant

Sub. Kontraktor :
Sub. Contractor

CONTRACTOR SUBMISSION REVIEW


Judul Gambar
Drawing Title

Review does not constitute acceptance or approval of design PROPOSE ELEVATION


details, calculations, analyses, test method or materials AND POSITION SUPPORT
developed or selected by the contractor and does not relieve the PIPE STEAM ( F, G, H, I )
contractor from compliance with contractual obligation.
Digambar Diperiksa Disetujui Skala

1. No Exceptions Taken 01 FEB. 2023 Drawn Checked Approved Scale

KF Saut Krisna/Hari
A3
2. Not suitable for Construction. Incorporate Changes Tanggal Tanggal Tanggal
Date Date Date
Indicated Prior to Proceeding.
No. Lembar No Gambar Revisi
3. Not Suitable for Construction. Review and resubmit. Drawing Page Drawing No. Revision

MEP-UT-CO2-3100-CON R0
4. Review Not Required.
Job.: Juno Project FFI Kode Gambar
Drawing Code
By: RS982 Date: 02-02-2023
Beca Forcon Ref :

CAD Ref.
KEY PLAN
Legend

27993 31674 U20' 5990 U21'


U14.1 U14.1' U20 U21 U22
U16 4000 U16' 2974 1026
U17 4000 U17' 4000 U18 4000 U18' 4000 U19 4000 U19' 4000 U20 4000 2648 1352 4000 638 1978 1384
4000 4000 SOCK. 200 X 25
ELv. +17.372 ELv. +17.372

709

712
200-STM-CS3 (1 : 45) 200-STM-CS3 (1 : 31)
200-STM-CS3 (1 : 39) 200-STM-CS3 (1 : 45)
200-STM-CS3 (1 : 45)

1014

1014
200-STM-CS3 (1 : 39)

999

906

903
200-STM-CS3 (1 : 45)

818

725
672

637
565

544
457

473

363
350

No. Catatan & Revisi Tanggal


No. Note & Revisions Date

Nama Proyek :
Project Name :

PROJECT JUNO
GREENFIELD FACTORY

Pemberi Tugas :
Owner :

FRISIAN FLAG
INDONESIA

Manajemen Konstruksi :
Construction Management :

U22 U22' 22014


U23 U23' U24.1 U24.1' U26 U26' 24035 U27 U27' U28 U28' U29 U29' U30
1384 4000 4000 4000 4000 2652 1348 4000 4000 4000 4000 4000 2687
SOCK. 200 X 25 SOCK. 200 X 150
ELv. +17.382
00-STM-CS3 (1 : 31) 200-STM-CS3 (1 : 45)
200-STM-CS3 (1 : 31)
1000
903

910

819
768

729

638
633

548
200-STM-CS3 (1 : 31)
497

361

Kontraktor Utama :
Main Contractor

PT. TATAMULIA NUSANTARA INDAH


www.tatamulia.co.id
SAPTA MULIA CENTER ; Jl.Rawa Gelam V, Kav.OR-3B
Kawasan Industri Pulogadung, Jakarta Timur 13930
Tel. 021-4606960, Fax. 021-4606962 ; Email : tatajkt@cbn.net.id

C Konsultan Pengawas :
Supervisor Consultant
U33

Sub. Kontraktor :
Sub. Contractor

CONTRACTOR SUBMISSION REVIEW


Review does not constitute acceptance or approval of design Judul Gambar
Drawing Title
details, calculations, analyses, test method or materials PROPOSE ELEVATION
developed or selected by the contractor and does not relieve the AND POSITION SUPPORT
contractor from compliance with contractual obligation. PIPE STEAM ( F, G, H, I )
1. No Exceptions Taken Digambar Diperiksa Disetujui Skala
01 FEB. 2023 Drawn Checked Approved Scale

2. Not suitable for Construction. Incorporate Changes KF Saut Krisna/Hari


A3
Indicated Prior to Proceeding. Tanggal Tanggal Tanggal
Date Date Date

3. Not Suitable for Construction. Review and resubmit.


No. Lembar No Gambar Revisi
Drawing Page Drawing No. Revision

4. Review Not Required. MEP-UT-CO2-3100-CON R0


Job.: Juno Project FFI
By: RS982 Date: 02-02-2023 Kode Gambar