You are on page 1of 8

Project: RIVERPARK RESIDENCES

Client: TRIANON RIVERPARK RESIDENCES LTD


Drawing Register Date of Issue
TENDER DRAWINGS Day 11
Construction of a Multipurpose Complex at Goodlands Mon 7
Year 23

Drawing No. Drawing Title Size Revision Issued

1011/STR/TEN/LAY/001 Foundation Layout A1 0


1011/STR/TEN/LAY/SEC/002 Ground Floor Layout and Sections A1 0
1011/STR/TEN/SEC/003 Ground Floor Sections A1 0
1011/STR/TEN/LAY/003 First Floor Layout and Sections A1 0
1011/STR/TEN/LAY/004 Roof Layout and Sections A1 0
1011/STR/TEN/SEC/002 Section A-A A1 0

Distribution No of Copies Issued


Client: The District Council of Riviere du Rempart M

Project Manager: KIMs Consulting Engiineers Ltd M

Main Contractor:

Architect: PRAVIN DESAI LTD M

Quantity Surveyor: V.S. CONSULTING LTD M

MEP Engineers: AXIS ENGINEERS LTD M

Others:

Format
DROP
Received By: BOX CD Mail Fax Hard Copy

Company:………………………………………………….. DB C M F H

Name:……………………………………………………….
Signature:…………………………………………………
Date:…………………………………………………………

For Hard Copy, Kindly fill-in and return to KIMs Consulting Engineers Ltd at your earliest convenience
Designed Drawn Checked Approved Date Scale
VP VP MK - JULY 1 : 75
2023
Rev. Date Revision Note Issued by
1 11.07.2023 FOR TENDER

Drawing No. Reference

NOTES:

1. This drawing to be read in conjunction with all relevant


Architect's and M&E Engineer's drawings.

2. Dimensions must not be scaled or assumed. After


notification, discrepancies or missing dimensions will be
corrected in writing by the Engineer.

3. Concrete strength at 28 days to be as follows:


a. Foundations 30 MPa
b. Columns 30 MPa
1 2 3 4 5 6 7 c. Surface Beds 30 MPa
d. Walls 30 MPa
39385 e. Beams 30 MPa
f. Slabs 30 MPa
7185 2500 7388 7413 7413 7488
4. All excavations for foundations to be inspected and
approved by the Engineer before casting of blinding
2000 A 2000 concrete.
8 8 10
1
10 5. Grade 15 MPa blinding concrete to be cast under all
C2 C2 C2 C2 C2 C2 C2 foundations, strip footings and grounf-bearing slabs.

200

200
C1
6. LEGEND

200

600

600

200
A C2

200

200
2000

2500

2500

2500

2000
6.1 Columns and walls shown thus

200

200
1 1

200

600

200

600
a. Are under
8

200

200
1 C1 8
C1 C1
C2 C2 C1 Base B1 b. Are over
C2 C2
450mm
Base B2 Base B2
Thick c Are under and over
350mm 10 350mm
Thick 10 Thick
2500 Base B1 2500 2500 Base B5 C4 6.2 Block Wall
450mm

800
C2 300mm
C2 Base B1 Thick Thick a. Reinforced block wall
450mm

200
Thick

600

200
C2 1300 b. Block wall over and under

200
C2
C3 c Block wall under
11 5 5
1300
d. Infilled block wall
C2
C4 6.3 Reinforcement
200

Base B5
8400

800
C2
600

200

C2 C2 300mm
Y - High yield deformed bars with a min yield stress
200

Thick
of 425 MPa
1300
R - Hot rolled mild steel bars with min yield stress of
11 Base B4 900
350mm 250 MPa
Base B6
Thick
1 1 300mm BF -Both Faces FF -Far Face NF -Near Face
C2 Mass Mass Base B3
1300

1100
Thick B -Bottom T -Top STG -Stagger TOG -Together
Concrete Concrete 350mm
800x800x800 800x800x800 Thick ABR -Alternative bar reversed

1400
C3 C6
C2 C2 LAYERS: The numbering of layers is related to the
2000
B1 - Bottom 1st Layer (Lowest Bottom Layer)
B2 - Bottom 2nd Layer ..............................etc
T1 - Top 1st Layer (Highest Top Layer)
T2 - Top 2nd Layer .........................etc

12 12 Cover to main steel:


C2 C2 a. Columns 30mm
14 14 b. Slabs 20mm
200

C2
c. Beams 30mm
200

600

B d. Walls 30mm
200

C2 C3 e. Foundations 50mm
17750

All laps to have a minimum length of 50 X Dia. of the


1 1 200 bar

200
200 5 5
3150

200
200 900
600 Base B6
200
300mm
600 1300 2000 Thick
Base B4 Mass Mass
350mm

1400
Concrete Concrete
C2 C2 C3 Thick 800x800x800 800x800x800 C6
200

Base B3

1100
1300

C
200

600

C2 350mm
200

C2 Thick
C5
1750

C2 C2 Base B5 C4
7 7

800
200

C2 300mm
200

600

Thick
D
200

C2
1300
C2
C3 13 13
5 5
11 11 C2 Base B1
Base B1 Base B1
1 1 450mm 450mm 450mm
Base B5 C4
Thick

800
Thick Thick 2500 300mm
Base B2 2500 2500 4 Thick
C2 350mm 10
4450

4 8
Thick 1300
200 3
C2 C2 3
200 C2 C2
C1 C1 C1
200 C1
C2
C1
C2
600
2000

2500

2500

2500

2000
1
C2 C2 C2
2 C2 C2
E C2 C2
2000 2000
C2 10

200
8 Base B2
1

200

600
350mm

200
Thick

4 A
3
2 3 4

CLIENT

The District Council of Riviere du


Rempart

PROJECT

Construction of a Multipurpose
Complex at GOODLANDS

DRAWING TITLE

Foundation Layout

Drawing No. 1011/STR/TEN/LAY/001


Designed Drawn Checked Approved Date Scale
VP VP MK - JULY As
2023 indicated

Rev. Date Revision Note Issued by


1 11.07.2023 FOR TENDER

1 2 3 4 5 6 7
39385

7185 2500 7388 7413 7413 7488

8
8 10 A
1 10
Plinth Plinth Drawing No. Reference
250x200 SL Plinth Plinth Plinth Plinth
250x200 SL
-270 250x200 SL C2 250x200 SL C2 250x200 SL C2 250x200 SL
-270 C2
-250 -250 -250 -250
A C1 A
C1 C2 C1 C2 C1 C1
1 1 C2 C2
250x200 SL

BM 400x200
SL -420
1
Plinth

-270

BM 700x200 BM 700x200 BM 700x200 BM 700x200

250x200 SL
SL -700 SL -700 SL -700 SL -700

Plinth

-270
8
10 8 10
C4 NOTES:
-20
6 6 1. This drawing to be read in conjunction with all relevant

BM 700x200
BM 400x200
C3 Architect's and M&E Engineer's drawings.

SL -700
SL -400

BM 700x200

BM 700x200
Slab 100mm 0 0 0
250x200 SL

SL -700

SL -700
Thick 2. Dimensions must not be scaled or assumed. After
6 6
Plinth

13 13 notification, discrepancies or missing dimensions will be


-270

5 5 corrected in writing by the Engineer.


Slab 150mm Slab 150mm Slab 150mm
11 Thick Thick
Plinth Thick 3. Concrete strength at 28 days to be as follows:
250x200 SL a. Foundations 30 MPa
C4
-270 b. Columns 30 MPa
8400

Slab 150mm
Slab 150mm c. Surface Beds 30 MPa
Thick d. Walls 30 MPa

Thick
250x200 SL

6 e. Beams 30 MPa
Mass f. Slabs 30 MPa
Plinth

-270

11 Concrete Mass
800x800x800 Concrete
BM 400x200 800x800x800 4. All excavations for foundations to be inspected and
BM 700x200
SL 610 BM 700x200 BM 700x200 C3 approved by the Engineer before casting of blinding
SL -700
1 1 SL -700 SL -700 concrete.
-20 C3
5. Grade 15 MPa blinding concrete to be cast under all
foundations, strip footings and grounf-bearing slabs.

250x200 SL
Slab 100mm
Plinth
6 6. LEGEND
Thick -270
250x200 SL

BM 400x200

Slab 150mm Slab 150mm 6.1 Columns and walls shown thus
7 7
SL -420
Plinth

-270

Thick Thick
12 12 a. Are under

12 12 b. Are over

BM 400x200
Plinth 0 0 0

BM 340x200

BM 700x200
14 14

SL -400
250x200 SL

SL -700
C2 6 6 c Are under and over

SL 860
-270

BM 700x200
B Slab 150mm Slab 150mm B

SL -700
Slab 150mm 6.2 Block Wall
17750

Thick Thick Thick


C3 a. Reinforced block wall
1 1
b. Block wall over and under
Slab 150mm
250x200 SL

Slab 150mm
BM 400x200

Thick
SL -420

-20
Thick
Plinth

c Block wall under


-270
3150

5 5
250x200 SL

d. Infilled block wall


Plinth

-270

Slab 100mm
Thick
6 6.3 Reinforcement
Mass Mass
Plinth Concrete Concrete
BM 400x200 Y - High yield deformed bars with a min yield stress
250x200 SL 800x800x800 800x800x800
SL 610 of 425 MPa
-270 BM 700x200 BM 700x200 BM 700x200 C3
SL -700 SL -700 SL -700
C C3
C R - Hot rolled mild steel bars with min yield stress of
250 MPa

BF -Both Faces FF -Far Face NF -Near Face


BM 400x200
1750

1 B -Bottom T -Top STG -Stagger TOG -Together


SL -400

6 ABR -Alternative bar reversed


Slab 150mm
Thick
7 7 BM 340x200 LAYERS: The numbering of layers is related to the
SL 860

BM 700x200

BM 700x200
D C4 B1 - Bottom 1st Layer (Lowest Bottom Layer)

SL -700

SL -700
B2 - Bottom 2nd Layer ..............................etc
Plinth 0 0 0
6 6 T1 - Top 1st Layer (Highest Top Layer)
250x200 SL

250x200 SL
Slab 150mm BM 340x200 T2 - Top 2nd Layer .........................etc
-270 13 13
Plinth

-270

Thick SL 860
1 5 5 Cover to main steel:
Slab 150mm Slab 150mm Slab 150mm
11 11 Thick Thick
a. Columns 30mm
C3 Thick
b. Slabs 20mm
250x200 SL

250x200 SL

1 1 -20
c. Beams 30mm
Plinth

Plinth
-270

-270

d. Walls 30mm
C4 e. Foundations 50mm
4450

3 4 4 8
3 10
250x200 SL

Slab 100mm All laps to have a minimum length of 50 X Dia. of the


bar
Plinth

-270

Thick BM 700x200 BM 700x200 BM 700x200


Slab 150mm

BM 700x200 C2 SL -700 SL -700 SL -700


SL -700
Thick

1 C2
C1 C1 C2 C1
Plinth C1 C1
250x200 SL
-270 2 C2
-20 Plinth
Plinth Plinth C2 Plinth 250x200 SL C2
10
250x200 SL -20 -20
E 250x200 SL
-250 Slab 150mm -250
250x200 SL
-250
-250
Slab 150mm
Thick
Thick
8
1
Plinth
Plinth Plinth 250x200 SL
250x200 SL 250x200 SL -270
3 -270 -270
2 4 3 A
4

2. Ground Floor
1 1 : 75 2 3 4 5 6 7

Double layer Double layer


0.23mm Double layer
0.23mm 0.23mm
Double layer Polythene TOC= 0.000
TOC= -0.020 Polythene TOC= 0.000 Polythene
0.23mm Sheeting TOC= 0.000
Sheeting Sheeting
Double layer TOC= -0.020 Polythene TOC= -0.020
Sheeting 200 500 200 200 2000 200
0.23mm 200 200
Polythene
200
Sheeting
100

150

150

150
150

150

150
250
250

250

250

250

100mm 100mm
Compacted Compacted
Crusher Run Crusher Run
700

700

700
200
550

550
TOC= 1.200

Hardcore Hardcore
Filling Hardcore
Hardcore Hardcore Filling
Compacted Hardcore Filling
Filling Filling Compacted
Compacted

340
Compacted to 95% BS Filling to 95% BS
Compacted to 95% BS
to 95% BS Compacted
to 95% BS
to 95% BS
Hardcore
Filling
Compacted
to 95% BS

200 200 200 200 200 200 200 200 200


200 200 200 200 200 200 200 200 200 200 200 200

860
Double layer
250

250

250

250

250

250

250
0.23mm
Polythene
TOC= -0.020 Sheeting
600 600 600 600 600
600
600 GF Section 4

150
GF Section 2 GF Section 5

400
1 : 25 100mm

GF Section 1 1 : 25 GF Section 3 Compacted

230
1 : 25 Crusher Run
1 : 25
1 : 25
Hardcore
Filling
Compacted
to 95% BS

CLIENT
TOC= 0.000 200 TOC= -0.020
TOC= 0.000 TOC= 0.000
Double layer
Double layer Double layer
500 200 0.23mm
Polythene
Double layer
0.23mm
0.23mm 0.23mm
Polythene
The District Council of Riviere du
Sheeting Polythene
Polythene
Sheeting Sheeting Rempart
100
150

150

150

Sheeting
250

250

100mm 100mm 100mm 100mm TOC= -0.020 Double layer


Compacted Compacted Compacted Compacted 200 0.23mm
Crusher Run Crusher Run Crusher Run Crusher Run Polythene
700

700

PROJECT
Sheeting
Hardcore
550

550

Hardcore Hardcore Hardcore

100

250
Filling Filling Filling Filling
Compacted Compacted Compacted Compacted 100mm
to 95% BS Compacted Construction of a Multipurpose

400
to 95% BS to 95% BS to 95% BS

300
Crusher Run
600 Complex at GOODLANDS
200
Hardcore
Filling
Compacted
GF Section 6 to 95% BS GF Section 7 DRAWING TITLE
1 : 25 1 : 25
GF Section 11
1 : 25
Ground Floor Layout and sections
200 200 200 200
250

250

250

600 600 600

GF Section 8
GF Section 9 GF Section 10
1 : 25
1 : 25 1 : 25 Drawing No. 1011/STR/TEN/LAY/SEC/002
Designed Drawn Checked Approved Date Scale
VP VP MK - JULY 1 : 25
2023
Rev. Date Revision Note Issued by
1 11.07.2023 FOR TENDER

TOC= 1.200
300 Drawing No. Reference

150
160
300
Rocksand Blinding 75mm 300

150
180
TOC= 0.000
300
200 4732 200

150
300

150
150

150
300
NOTES:

400

150
300 1. This drawing to be read in conjunction with all relevant

700
Double layer
0.23mm Architect's and M&E Engineer's drawings.

150
Polythene TOC= 0.000
Sheeting 2. Dimensions must not be scaled or assumed. After
notification, discrepancies or missing dimensions will be

150
corrected in writing by the Engineer.
Crusher run 0/20 100mm Thick

150 150
3. Concrete strength at 28 days to be as follows:
Grabbeaux

300
a. Foundations 30 MPa
b. Columns 30 MPa

1080
c. Surface Beds 30 MPa
d. Walls 30 MPa
e. Beams 30 MPa
f. Slabs 30 MPa

4. All excavations for foundations to be inspected and


200 200 200 200 200 200 approved by the Engineer before casting of blinding
concrete.
100mm Hardcore
5. Grade 15 MPa blinding concrete to be cast under all
Compacted Filling
250

250
foundations, strip footings and grounf-bearing slabs.
Crusher Run Compacted
to 95% BS
6. LEGEND
600 600
6.1 Columns and walls shown thus

200 200 200 a. Are under

b. Are over

GF Section 12

250
c Are under and over

1 : 25 6.2 Block Wall


600
a. Reinforced block wall
GF Section 13 b. Block wall over and under
1 : 25
c Block wall under

d. Infilled block wall

6.3 Reinforcement

Y - High yield deformed bars with a min yield stress


of 425 MPa

R - Hot rolled mild steel bars with min yield stress of


250 MPa
TOC= 1.200
Double layer BF -Both Faces FF -Far Face NF -Near Face
0.23mm B -Bottom T -Top STG -Stagger TOG -Together
Polythene ABR -Alternative bar reversed
Sheeting
LAYERS: The numbering of layers is related to the
100mm
340

B1 - Bottom 1st Layer (Lowest Bottom Layer)


Compacted
B2 - Bottom 2nd Layer ..............................etc
Crusher Run
T1 - Top 1st Layer (Highest Top Layer)
T2 - Top 2nd Layer .........................etc

Cover to main steel:


a. Columns 30mm
b. Slabs 20mm
c. Beams 30mm
860

d. Walls 30mm
Hardcore
e. Foundations 50mm
Filling
Compacted
Double layer All laps to have a minimum length of 50 X Dia. of the
to 95% BS TOC= 0.000
0.23mm bar
Polythene
Sheeting
150

100mm
Compacted
Crusher Run
700

Hardcore
Filling
Compacted
to 95% BS

GF Section 14
1 : 25

CLIENT

The District Council of Riviere du


Rempart

PROJECT

Construction of a Multipurpose
Complex at GOODLANDS

DRAWING TITLE

Ground Floor Sections

Drawing No. 1011/STR/TEN/SEC/003


Designed Drawn Checked Approved Date Scale
VP VP MK - JULY As
2023 indicated

Rev. Date Revision Note Issued by


1 11.07.2023 FOR TENDER

1 2 3 4 5 6 7
39385

7185 2500 7388 7413 7413 7488 Drawing No. Reference

1
Upstand A
200mm High

BM 500x200 BM 500x200
SL 3000 SL 3000
A

BM 500x200
1

SL 3000
NOTES:

1. This drawing to be read in conjunction with all relevant


Architect's and M&E Engineer's drawings.
BM 500x200 Slab 150mm
SL 3000 Thick
2. Dimensions must not be scaled or assumed. After
3500 3 3 notification, discrepancies or missing dimensions will be
corrected in writing by the Engineer.

BM 500x200
3. Concrete strength at 28 days to be as follows:

SL 3000
a. Foundations 30 MPa
b. Columns 30 MPa
1 1 c. Surface Beds 30 MPa

BM 500x200
3
d. Walls 30 MPa

SL 3000
e. Beams 30 MPa
BM 500x200
f. Slabs 30 MPa
8400

SL 3000
4. All excavations for foundations to be inspected and
Upstand approved by the Engineer before casting of blinding
200mm High concrete.
3 Upstand
200mm High 5. Grade 15 MPa blinding concrete to be cast under all
foundations, strip footings and grounf-bearing slabs.
3500
6. LEGEND
BM 500x200
SL 3000

BM 500x200
6.1 Columns and walls shown thus
Slab 150mm

SL 3000

BM 500x200
4 4
Thick a. Are under

SL 3000
BM 500x200

b. Are over
3500
SL 3000

3 c Are under and over

Slab 150mm 6.2 Block Wall


Thick
BM 500x200 6 6 Slab
a. Reinforced block wall
SL 3000 175mmThick
B b. Block wall over and under
17750

c Block wall under


3500 3700 5 5
BM 500x200

BM 500x200
1 1

BM 500x200
d. Infilled block wall
SL 3000

SL 3000
3

SL 3000
Upstand
200mm High 6.3 Reinforcement
Slab 150mm
3150

Thick 3 3
Y - High yield deformed bars with a min yield stress
of 425 MPa

1 Upstand
R - Hot rolled mild steel bars with min yield stress of
250 MPa
200mm High
BM 500x200 BM 500x200 BF -Both Faces FF -Far Face NF -Near Face
SL 3000 SL 3000 B -Bottom T -Top STG -Stagger TOG -Together
C ABR -Alternative bar reversed

LAYERS: The numbering of layers is related to the

BM 500x200
1750

1
SL 3000
B1 - Bottom 1st Layer (Lowest Bottom Layer)
1 4 4 B2 - Bottom 2nd Layer ..............................etc
BM 500x200 BM 500x200 T1 - Top 1st Layer (Highest Top Layer)
SL 3000 SL 3000 T2 - Top 2nd Layer .........................etc
D Cover to main steel:
a. Columns 30mm
BM 500x200

3 3 b. Slabs 20mm
SL 3000

Upstand 1 Slab 150mm c. Beams 30mm


200mm High Thick d. Walls 30mm
e. Foundations 50mm
BM 500x200

3500 All laps to have a minimum length of 50 X Dia. of the


SL 3000

2 2 bar
4450

Slab
175mmThick
BM 500x200

1 1
SL 3000

1
BM 500x200
SL 3000
BM 500x200
SL 3000
E

1 A

3. First Floor
1 : 75

200
TOC= 3.700 150

TOC= 3.500 200


200 TOC= 3.500
TOC= 3.500 TOC= 3.500
175

200
200

200

TOC= 3.700
150

150

150
175

175

175 150
700

700

1200
500

500

500
350

350
325

325

825

SL 3.000 SL 3.000 SL 3.000 SL 3.000


200

410
SL 2.700 SL 3.115
FF Section 3 FF Section 4
FF Section 1

215

1125
FF Section 2 1 : 25 1 : 25
1 : 25
1 : 25 FF Section 5
1 : 25

500
SL 2.400

200

CLIENT

The District Council of Riviere du


Rempart
FF Section 6
1 : 25 PROJECT

Construction of a Multipurpose
Complex at GOODLANDS

DRAWING TITLE

First Floor Layout and Sections

Drawing No. 1011/STR/TEN/LAY/003


Designed Drawn Checked Approved Date Scale
VP VP MK - JULY As
2023 indicated

Rev. Date Revision Note Issued by


1 11.07.2023 FOR TENDER

Drawing No. Reference

NOTES:
1 2 3 4 5 6 7 1. This drawing to be read in conjunction with all relevant
Architect's and M&E Engineer's drawings.
39385
2. Dimensions must not be scaled or assumed. After
7185 2500 7388 7413 7413 7488 notification, discrepancies or missing dimensions will be
corrected in writing by the Engineer.

2 3. Concrete strength at 28 days to be as follows:


A a. Foundations 30 MPa
BM 700x200
2 BM 700x200 BM 700x200
2 2 BM 700x200 b. Columns 30 MPa
SL 7778 SL 7778 SL 7778 SL 7778 c. Surface Beds 30 MPa
d. Walls 30 MPa
e. Beams 30 MPa
A f. Slabs 30 MPa

4. All excavations for foundations to be inspected and


2 approved by the Engineer before casting of blinding
2 2 2 concrete.

1000-1500x650

1000-1500x650
Tapered Beam

Tapered Beam
1000-1500x650
Tapered Beam
SL <varies>

SL <varies>
5. Grade 15 MPa blinding concrete to be cast under all

SL <varies>
foundations, strip footings and grounf-bearing slabs.

6. LEGEND

6.1 Columns and walls shown thus


Slab Slab Slab Slab
a. Are under
175mmThick 175mmThick 175mmThick 175mmThick
b. Are over

c Are under and over

6.2 Block Wall


8400

3 a. Reinforced block wall

3 3 b. Block wall over and under


3
BM 800x200 BM 800x200 BM 800x200 BM 800x200 c Block wall under
SL 7787 SL 7787 SL 7787 SL 7787
d. Infilled block wall

6.3 Reinforcement

Y - High yield deformed bars with a min yield stress


3 3 3 of 425 MPa

BM 700x200
SL <varies>
3

BM 1000x650
R - Hot rolled mild steel bars with min yield stress of

20mm Camber
SL <varies>

BM 1000x650
20mm Camber

20mm Camber
BM 1000x650
250 MPa

SL <varies>
SL <varies>
BF -Both Faces FF -Far Face NF -Near Face
Slab Slab Slab Slab B -Bottom T -Top STG -Stagger TOG -Together
175mmThick 175mmThick 175mmThick 175mmThick ABR -Alternative bar reversed

LAYERS: The numbering of layers is related to the


B
B1 - Bottom 1st Layer (Lowest Bottom Layer)
17750

BM 700x200
SL <varies>
B2 - Bottom 2nd Layer ..............................etc
T1 - Top 1st Layer (Highest Top Layer)
T2 - Top 2nd Layer .........................etc

Cover to main steel:


3150

a. Columns 30mm
b. Slabs 20mm
4 c. Beams 30mm
d. Walls 30mm
4 4 e. Foundations 50mm
BM 800x200 BM 800x200 BM 800x200 BM 800x200
SL 7904 SL 7904 SL 7904 SL 7904 All laps to have a minimum length of 50 X Dia. of the
bar

C
1750

4 4
4

D
5 5 Slab Slab Slab Slab
175mmThick 175mmThick 175mmThick 175mmThick

1000-1500x650

1000-1500x650

1000-1500x650
Tapered Beam

Tapered Beam

Tapered Beam
SL <varies>

SL <varies>

SL <varies>
4450

BM 700x200 1 BM 700x200 BM 700x200


1 BM 700x200
SL 8105 SL 8105 SL 8105 SL 8105

E A
1 1

4. Roof
1 : 75

200

TOC= 8.590

TOC= 8.478 TOC= 8.707


175

175

200
175

200 TOC= 8.756


630

TOC= 8.823

267
626
525

175
SL 7.787
175

200
SL 7.778 SL 7.904

700
525
200
CLIENT

RF Section 2
SL 8.105 1 : 25 The District Council of Riviere du
RF Section 3 Rempart
1 : 25

PROJECT

Construction of a Multipurpose
RF Section 4 RF Section 5 Complex at GOODLANDS
1 : 25 1 : 25
RF Section 1
1 : 25
DRAWING TITLE

Roof Layout and Sections

Drawing No. 1011/STR/TEN/LAY/004


Designed Drawn Checked Approved Date Scale
VP VP MK - JULY 1 : 30
2023
Rev. Date Revision Note Issued by
1 11.07.2023 FOR TENDER

E D C B A

Drawing No. Reference

4450 1750 3150 8400

NOTES:

1. This drawing to be read in conjunction with all relevant


Architect's and M&E Engineer's drawings.
TOC= 8.823
200
2. Dimensions must not be scaled or assumed. After
notification, discrepancies or missing dimensions will be
corrected in writing by the Engineer.

TOC= 8.478 200 3. Concrete strength at 28 days to be as follows:

175
a. Foundations 30 MPa

175
b. Columns 30 MPa
c. Surface Beds 30 MPa

175
d. Walls 30 MPa

539
e. Beams 30 MPa
f. Slabs 30 MPa

1000

630
825
SL 8.105 4. All excavations for foundations to be inspected and

630
1500

1000
approved by the Engineer before casting of blinding

522
concrete.

200 SL 7.778 5. Grade 15 MPa blinding concrete to be cast under all

1507
foundations, strip footings and grounf-bearing slabs.
200
6. LEGEND
2034 Upward camber of 20mm to be provided
11570 to formwork of beam 6.1 Columns and walls shown thus

1998 a. Are under

b. Are over

c Are under and over


2440

6.2 Block Wall

2113
a. Reinforced block wall

b. Block wall over and under

c Block wall under

d. Infilled block wall

6.3 Reinforcement

Y - High yield deformed bars with a min yield stress


of 425 MPa

R - Hot rolled mild steel bars with min yield stress of


250 MPa
400

400
BF -Both Faces FF -Far Face NF -Near Face
SL 5.265 SL 5.265 B -Bottom T -Top STG -Stagger TOG -Together
ABR -Alternative bar reversed

LAYERS: The numbering of layers is related to the

B1 - Bottom 1st Layer (Lowest Bottom Layer)


B2 - Bottom 2nd Layer ..............................etc
T1 - Top 1st Layer (Highest Top Layer)
T2 - Top 2nd Layer .........................etc

Cover to main steel:


a. Columns 30mm
8644

8644

b. Slabs 20mm
c. Beams 30mm
d. Walls 30mm
2365

2365
e. Foundations 50mm

All laps to have a minimum length of 50 X Dia. of the


bar
500

500
SL 2.400 SL 2.400
2400

2400
17000

TOC= 0.000
TOC= -0.020
150

150

150

170
250

250
200
700

700

700
200
550

550

550

550
200 Hardcore
Filling 200
Compacted
to 95% BS
Mass Mass
800

Concrete Concrete
800x800x800 800x800x800
250

250
600 600

CLIENT

Section A-A
1 : 30 The District Council of Riviere du
Rempart

PROJECT

Construction of a Multipurpose
Complex at GOODLANDS

DRAWING TITLE

Section A-A

Drawing No. 1011/STR/TEN/SEC/002


Designed Drawn Checked Approved Date Scale
VP VP MK - JULY As
2023 indicated

Rev. Date Revision Note Issued by


1 11.07.2023 FOR TENDER

7
Drawing No. Reference
15

9500 5688

BM 400x200
SL <varies>
Paving Blocks
16 16 Rocksand Blinding 75mm NOTES:

3800
TOC= 0.000 TOC= -0.020 1. This drawing to be read in conjunction with all relevant
200 4732 200 Architect's and M&E Engineer's drawings.

2. Dimensions must not be scaled or assumed. After


notification, discrepancies or missing dimensions will be
corrected in writing by the Engineer.

400
3. Concrete strength at 28 days to be as follows:
A A a. Foundations 30 MPa

700
b. Columns 30 MPa
c. Surface Beds 30 MPa
d. Walls 30 MPa
BM 400x200 e. Beams 30 MPa
SL <varies> f. Slabs 30 MPa

Crusher run 0/20 150mm Thick 4. All excavations for foundations to be inspected and
approved by the Engineer before casting of blinding
Grabbeaux 0/100 200mm Thick

0 0
42 0
concrete.

- 0x2

1080
SL 40
5. Grade 15 MPa blinding concrete to be cast under all

M
foundations, strip footings and grounf-bearing slabs.

B
6. LEGEND

6.1 Columns and walls shown thus


200 200 200
a. Are under
14700

b. Are over

250

250
c Are under and over

600 600 6.2 Block Wall

a. Reinforced block wall

b. Block wall over and under

GF Section 12. c Block wall under

1 : 25 d. Infilled block wall

6.3 Reinforcement

Y - High yield deformed bars with a min yield stress


of 425 MPa

12
2 12
2 R - Hot rolled mild steel bars with min yield stress of
BM 400x200

250 MPa
SL -420

B B BF -Both Faces
B -Bottom
FF -Far Face
T -Top
NF -Near Face
STG -Stagger TOG -Together
ABR -Alternative bar reversed

LAYERS: The numbering of layers is related to the

B1 - Bottom 1st Layer (Lowest Bottom Layer)


B2 - Bottom 2nd Layer ..............................etc
T1 - Top 1st Layer (Highest Top Layer)
T2 - Top 2nd Layer .........................etc

Cover to main steel:


a. Columns 30mm
b. Slabs 20mm

Crusher run 0/20 150mm Thick c. Beams


d. Walls
30mm
30mm
C C e. Foundations 50mm
Paving Blocks All laps to have a minimum length of 50 X Dia. of the
5888
Rocksand Blinding 75mm LVL -0.020 bar

Rocksand Blinding 75mm


1:13
Crusher run 0/20 150mm Thick
BM 400x200
SL <varies>

LVL -0.470
200
5299

Asphalt

5 5

400
Grabbeaux 0/100 200mm Thick

Grabbeaux 0/100 200mm Thick

GF Section 16
1 : 25
4682

B C
7 15

Crusher run 0/20 150mm Thick


5299
Paving Blocks
Rocksand Blinding 75mm LVL -0.020
Paving Blocks
1:12
CLIENT

LVL -0.470
The District Council of Riviere du
Rempart

Grabbeaux 0/100 200mm Thick PROJECT

Construction of a Multipurpose
Complex at GOODLANDS

DRAWING TITLE

Ground Floor Sections SHEET 2

GF Section 15
1 : 25
Drawing No. 1011/STR/TEN/SEC/004