To. Cc :
Owners Engineer ITDC - General Manager
Mutip Supervision Team Attn : Mr. Molin Duwanno
Attn : Romeo D.Acedilla
CMC - PT Jaya CM
Subject : Landslide V-V2 Attn : Mr. B. Erwin. Sihite
Technical Querry :
According to Site Inspection Report No. 074/SIRC/JO-MUTIP2/XII/2022 dated December, 30th 2022, there was a
landslide on the slopes of section V-V2 caused by continuous heavy rain in the Mandalika area. The soil due to the
landslide fell into the sidewalk and main road area of section V-V2. During the Joint Inspection, it was decided to install a
retaining wall and drainage in the area affected by the landslide at Section V-V2. Hereby we propose a retaining wall
design to be review and clarify so that contractor can immidiatelly proceed the construction on site.
Thankyou for your attention and coorperation.
Regards,
Contractor
HUTAMA - ADHI JO
No : …....................................
Response from Mutip Supervision Team Date : …....................................
…...........................................................................................................................................................................
…...........................................................................................................................................................................
Approved by,
Mutip Supervision Team
(Romeo D.Acedilla)
Owner's Engineer
Attachment RFI No. 104/RFI/JO/MUTIP-P2/I/2023
3
9.8 m
FRAME
PLAT
INJAK
PLAT
INJAK
NOTES AND KEY PLAN :
POST
0+250
INJAK
PELAT
PELAT
PELAT
INJAK
INJAK
INJAK
PELAT
SECURITY
POST
MATCHLINE
STA.0+500
V
Ø3
Ø3
Ø3
Ø350
Ø350
Ø350
HEADER Ø600
HEADER Ø600
PP-PLUMBING
MFP.3
UN 4 09.10Y.52
MFP.4
MFP.2
MFP.1
1270
200 KVA
1030
0.9150 Kg
ROOM
PANEL KONTROL
GENSET
GENSET
ROOM
CABLE TRENCH
OPERATOR
FUEL TANK
2000L
PANEL ROOM
ROOM
GENSET
FUEL TANK
2000L
SONGGONG
0+750
RIVER
0.00
0+00
GATEWAY E
SIGNAGE
MANDALIKA
RESORT
ROAD
PROVINCE
SIGNAGE
EAST GATE
0+000
SECURITY
POST SECURITY
PARKING
-0+000.00 STA.1+000
0+050
EMEREGENCY
BAY
BP:
0+025
PALM GRID
0+00
AVENUE
1+050
0+050
0+100
PELAT
INJAK
PELAT
INJAK
INJAK
0+100
PELAT
INJAK
PELAT
0+150
0+125
0+176.80
/h
0+150
INJAK
LAWN
ROW
PELAT
INJAK
Mid:
PELAT
= 45000
0+175
0+02
0+200
km
0+225
GOLF 0+250
LAWN
HALTE BUS
PEDESTRIAN ACCESS
(ECO TRAIL)
DRAIN
0+250
5
PARKING 10
BAY
0+275
EP: 0+370.17
TOILET PAVEMENT
INJAK
0+300
TENANT
INJAK
PLAT
0+325
POND
PLAT
0+300
0+350
0+370.
PEDESTRIAN ACCESS
TO COMMERCIAL AREA
WOODEN
DECKING
0.00 D = 30
PAVEMENT TENANT
0+05
PARKING
BAY
HALTE BUS
0+350
0
ROUNDABOUT
650
WITH
SCULPTURE
0 0+400
PELAT
PELAT INJAK
INJAK
050
0
0+450
TOILET
LAWN
0+07
PAVEMENT
0+500
TENANT
INJAK
PLAT
WOODEN
100
16
DECKING
0
HALTE BUS
WOODEN
BRIDGE
6000
WOODEN
0+550
DECKING PELAT INJAK PLAT
INJAK
0+00 EE
5
PARKING
BAY
6800
PELAT INJAK
0+600
STA N SP
EAST LAGOON
WOODEN
BRIDGE
PELAT INJAK
0+650
POND
PELAT INJAK
PELAT INJAK
PELAT INJAK
PELAT INJAK
0+700
PELAT
INJAK
PELAT
INJAK
PLAN
PLAT
INJAK
PELAT INJAK
PLAT INJAK
PELAT
PELAT INJAK
INJAK
DESIG
ROOF
INJAK
0+750
INJAK
PELAT
BRIDGE
PELAT
INJAK
PELAT
6800
PELAT
INJAK
0+800
-0+000
DESIGN SPEED = 20 km/h
BP: -0+000.00
STA 0+000.00
Mid: 0+006.20
0+12
PCC: 0+012.39
0+025
6000 Mid: 0+038.24
0+050
LAWN
5 PRC: 0+064.09
0+075
TENANT
PARKING
0+100
BAY
TENANT
MEETING
POINT
0+125
(PAVEMENT)
PELAT
INJAK
0+150
PARKING
BAY PELAT INJAK
0+
1.73 m
KE SALURAN LUAR
ROW
0+175
Mid:
= 45000
0+161.65
3
4.5 m
KE SALURAN
PIPA LUAR
VENT STACK
FRAME
LAWN
0+200
15 BR
BR
0+225
KE SALURAN LUAR
0+250
9.8 m
FRAME
PRC:
R127500
0+300
0+259.21
POND
0+325
Mid:
0+326.80
0+350
0+
WOODEN
TENANT DECKING
PAVEMENT
CROSSING BRIDGE
(FOR PEDESTRIAN)
LAWN
0+375
ISLAND
17
PARKING HALTE BUS
BAY
ACCESS
TO PUBLIC BEACH POND
0+400
PCC: 0+394.38
HALTE BUS
5
Mid: 0+403.08
0+412
PARKING EP: 0+411.78
BAY
INJAK
PELAT
PELAT
INJAK
ROUNDABOUT
WITH
SCULPTURE
LAWN
TENANT
9.8 m
KE SALURAN
PIPA LUAR
VENT STACK
3 FRAME
0+
20
0
0+
22
5
FRAME
KE SALURAN
PIPA LUAR
VENT STACK
INJAK
9.8 m
PELAT
3
INJAK
PELAT
0+25
0
0+275
KE SALURAN
PIPA LUAR
VENT STACK
9.8 m
3
FRAME
PLAT
INJAK
PLAT
INJAK
0+
0+000.00
30
0+000
BP:
km/h
0+025
= 30
0+050
0+075
SPEED
6000
6800
0
0+000.00
DESIGN
PLAN
ROOF
6800
0+125
STA
6000
0+150
0+175
0+200
0+225
0+250
0+275
0+300
0+325
0 4.949
0+325
0+350
0+375
0+400
0+425
0+450
0+475
0+500
0+525
0+550
0+575
0+600
0+625
0+650
0 4.949
0+675
0+700
0+725
0+350
0+750
0+775
0+800
0+825
0+850
0+875
0+900
0+925
0+950
EP:
2.009
0+952.010
0+375
PROJECT :
0+400
0+425
THE MANDALIKA URBAN AND
0+45
0
0+
TOURISM INFRASTRUCTURE
47
5
w e
0+
50
0
0+
PROJECT (MUTIP)
52
5
0+55
0
0+575
EMPLOYER
0+600
s
0+62
5
0+
65
0
0+
67
5
0+
70
0
0+
25 7
0+
75
0
0+
77
5
0+
00 8
0+
PT. Indonesia Tourism Development Corporation
25 8
0+
85
0
0+
87
5
V2
0+
90
0
CONSTRUCTION MANAGEMENT CONSULTAN
0+
92
5
0+
95
0
2.009
EP
:0
+9
52
.0
10
JAYA CM
ENGINEERS AND CONSULTING ENGINEERS
CONTRACTOR :
00 PACKAGE - 2
6
0+ SHOP DRAWING
Name Date & Sign
75
Drawn by Abdul Gani
AREA LONGSOR AREA LONGSOR
0 Accepted by
DRAWING TITLE :
Arief Indriyanto
SCALE :
1 : 1000
DRAWING REFERENCE :
-
NOTES AND KEY PLAN :
12.00
0+625
11.00
℄
10.00 5134 500 ROW 13500
534
500
MARKING
250 250
7.00 200 200
PROJECT :
6.00 3% -3%
1.00
DATUM 0.00
5.855
5.838
6.369 5.717
5.605
5.566
5.539
5.805 5.812
8.470
5.881
PLAN ELEVATION
7.697
7.750
8.619
8.702
6.823
6.228
5.638
5.276
EXISTING ELEVATION
PT. Indonesia Tourism Development Corporation
DISTANCE POINT 1.000 4.000 0.5002.000 9.200 6.800 1.000 10.000 1.000
CONSTRUCTION MANAGEMENT CONSULTAN
-16.700
-15.700
-11.700
-11.200
-9.200
17.800
18.800
0.000
6.800
7.800
CUMULATIVE DISTANCE
PLAN ELEVATION
GRUBBING
JAYA CM
ENGINEERS AND CONSULTING ENGINEERS
12.00
0+650
11.00 ℄
10.00 3761 500 ROW 13500 500 2256 Romeo D. Acedilla Bram Subiandoro
9.00 SIDEWALK CARRIAGEWAY SIDEWALK
CONTRACTOR :
1500 1500 3750 3750 1500 1500
8.00 BIORETENTION
MARKING
250 250
200 200
7.00
6.00 3% -3%
5.00
4.00 PROPOSED RETAINING WALL+DRAINAGE
8.159 5.794
5.755
7.465 5.643
7.380 5.531
5.492
5.465
6.701
7.783
PLAN ELEVATION
SHOP DRAWING
7.63
6.773
6.615
EXISTING ELEVATION
Name Date & Sign
DISTANCE POINT 6.000 2.000 5.000 3.500 1.000 11.000 Drawn by Abdul Gani
Checked by Rai Pramana
-13.000
15.500
3.500
-5.000
4.500
-7.000
0.000
1 : 1000
DRAWING REFERENCE :
-
NOTES AND KEY PLAN :
12.00
11.00 0+675
℄
10.00 4394 500 ROW 13500 500 1833
PROJECT :
9.00 SIDEWALK CARRIAGEWAY SIDEWALK
1500 1500 3750 3750 1500 1500
8.00 BIORETENTION BIORETENTION
THE MANDALIKA URBAN AND
MARKING
250 250
7.00 200 200
TOURISM INFRASTRUCTURE
6.00 -3% -3%
PROJECT (MUTIP)
5.00
EMPLOYER
4.00
PROPOSED RETAINING WALL+DRAINAGE
3.00
2.00
1.00
DATUM 0.00
6.372
5.437
5.464
9.764 5.502
7.124 5.615
5.503
5.464
6.596 5.437
7.676
PLAN ELEVATION PT. Indonesia Tourism Development Corporation
7.417
8.564
5.842
EXISTING ELEVATION CONSTRUCTION MANAGEMENT CONSULTAN
-13.000
14.000
JAYA CM
-7.000
-4.000
7.000
0.000
CUMULATIVE DISTANCE
ENGINEERS AND CONSULTING ENGINEERS
PLAN ELEVATION
GRUBBING
OWNER ENGINEER MANAGING DIRECTOR
10.00 ℄
7502 500 ROW 13500 500 2548
9.00
SIDEWALK CARRIAGEWAY SIDEWALK
8.00 1500 1500 3750 3750 1500 1500
BIORETENTION BIORETENTION
MARKING
250 250
7.00 200 200
6.00 PT. HUTAMA KARYA
-3% -3%
5.00 PT. ADHI KARYA, JO
4.00
3.00 PROPOSED RETAINING WALL+DRAINAGE
2.00
PACKAGE - 2
1.00
DATUM 0.00 SHOP DRAWING
6.381
8.905
9.021 5.082
5.109
5.148
6.882 5.260
5.148
5.109
6.52 5.082
Name Date & Sign
PLAN ELEVATION
Drawn by Abdul Gani
8.871
6.222
5.573
EXISTING ELEVATION Checked by Rai Pramana
Accepted by Arief Indriyanto
DISTANCE POINT 10.000 7.000 7.000 6.000 7.000 DRAWING TITLE :
20.000
13.000
0.000
-7.000
7.000
CUMULATIVE DISTANCE
SCALE :
1 : 1000
PLAN ELEVATION
GRUBBING
DRAWING NUMBER : REVISION :
DRAWING REFERENCE :
-
NOTES AND KEY PLAN :
12.00
11.00 0+750
10.00 ℄
4514 500 ROW 13500 500 1315
9.00
SIDEWALK CARRIAGEWAY SIDEWALK
8.00 1500 1500 3750 3750 1500 1500
BIORETENTION BIORETENTION
MARKING
7.00 250 250 PROJECT :
200 200
6.00
-3% -3% THE MANDALIKA URBAN AND
5.00
TOURISM INFRASTRUCTURE
4.00
PROJECT (MUTIP)
3.00 PROPOSED RETAINING WALL+DRAINAGE
2.00 EMPLOYER
1.00
DATUM 0.00
7.851 4.962
4.989
4.989
5.732 4.962
5.028
6.073 5.140
5.028
5.633
7.263
PLAN ELEVATION
6.314
6.160
6.437
7.110
5.351
EXISTING ELEVATION
PT. Indonesia Tourism Development Corporation
-22.000
-19.000
-13.000
-14.000
-7.000
0.000
7.000
6.000
CUMULATIVE DISTANCE
PLAN ELEVATION
GRUBBING
JAYA CM
ENGINEERS AND CONSULTING ENGINEERS
MARKING
250 250
200 200
6.00 PT. HUTAMA KARYA
-3% -3%
5.00 PT. ADHI KARYA, JO
4.00
3.00 PROPOSED RETAINING WALL+DRAINAGE
2.00
PACKAGE - 2
1.00
DATUM 0.00 SHOP DRAWING
6.045 4.832
4.859
4.859
4.693 4.832
4.680
5.952
4.925 5.010
4.455
4.218
EXISTING ELEVATION Checked by Rai Pramana
Accepted by Arief Indriyanto
DISTANCE POINT 10.000 7.000 7.000 10.000 1.000 DRAWING TITLE :
17.000
18.000
-7.000
0.000
7.000
CUMULATIVE DISTANCE
SCALE :
1 : 1000
PLAN ELEVATION
GRUBBING
DRAWING NUMBER : REVISION :
DRAWING REFERENCE :
-
NOTES AND KEY PLAN :
PROJECT :
JAYA CM
ENGINEERS AND CONSULTING ENGINEERS
1500
SIDEWALK CONTRACTOR :
300
300
500
PT. HUTAMA KARYA
PT. ADHI KARYA, JO
PACKAGE - 2
SHOP DRAWING
Name Date & Sign
Drawn by Abdul Gani
Checked by Rai Pramana
Accepted by Arief Indriyanto
DRAWING TITLE :
SCALE :
1 : 1000
DRAWING REFERENCE :
-
THE MANDALIKA URBAN AND TOURISM INFRASTRUCTURE PROJECT (MUTIP)
On this day,
Dated (Tanggal) : 30 Month (Bulan) : December Year (Tahun) : 2022
Package :2
Location : V-V2
Subject : Drainage V-V2
The undersign belows, has held inspection on site with description as follows :
(Yang bertanda tangan dibawah ini, telah melakukan inspeksi di site dengan deskripsi sebagai berikut)
:
1. Additional Box 1x1, DPT & U-Ditch behind Gerupuk Elementary School from the edge of the fence up to PJU
Contractor, CM Consultant,
HUTAMA-ADHI JO PT. Jaya CM ITDC Others
Contractor, CM Consultant,
HUTAMA-ADHI JO PT. Jaya CM ITDC Others