You are on page 1of 14

THE MANDALIKA URBAN AND TOURISM INFRASTRUCTURE PROJECT (MUTIP)

INFORMATION REQUEST MUTIP SUPERVISION TEAM

No : 105/RFI/JO/MUTIP-P2/I/2023 Attachment : 13 Pages


Date : 3 January 2023 IPMS :
Subject : Landslide V-V2

To. Cc :
Owners Engineer ITDC - General Manager
Mutip Supervision Team Attn : Mr. Molin Duwanno
Attn : Romeo D.Acedilla
CMC - PT Jaya CM
Subject : Landslide V-V2 Attn : Mr. B. Erwin. Sihite

Technical Querry :
According to Site Inspection Report No. 074/SIRC/JO-MUTIP2/XII/2022 dated December, 30th 2022, there was a
landslide on the slopes of section V-V2 caused by continuous heavy rain in the Mandalika area. The soil due to the
landslide fell into the sidewalk and main road area of section V-V2. During the Joint Inspection, it was decided to install a
retaining wall and drainage in the area affected by the landslide at Section V-V2. Hereby we propose a retaining wall
design to be review and clarify so that contractor can immidiatelly proceed the construction on site.
Thankyou for your attention and coorperation.

Regards,
Contractor
HUTAMA - ADHI JO

(Heru Wijanarko, S.T)


Project Manager

No : …....................................
 Response from Mutip Supervision Team Date : …....................................
…...........................................................................................................................................................................
…...........................................................................................................................................................................

Approved by,
Mutip Supervision Team

(Romeo D.Acedilla)
Owner's Engineer
Attachment RFI No. 104/RFI/JO/MUTIP-P2/I/2023
3
9.8 m

FRAME
PLAT
INJAK

PLAT
INJAK
NOTES AND KEY PLAN :
POST

0+250
INJAK

PELAT

PELAT

PELAT
INJAK

INJAK
INJAK

PELAT

SECURITY
POST

MATCHLINE
STA.0+500
V
Ø3

Ø3

Ø3

Ø350
Ø350
Ø350

HEADER Ø600

HEADER Ø600

PP-PLUMBING
MFP.3
UN 4 09.10Y.52
MFP.4

MFP.2

MFP.1
1270
200 KVA
1030
0.9150 Kg
ROOM

PANEL KONTROL
GENSET

GENSET

ROOM
CABLE TRENCH

OPERATOR
FUEL TANK
2000L

PANEL ROOM
ROOM

GENSET
FUEL TANK
2000L

SONGGONG

0+750
RIVER
0.00
0+00
GATEWAY E

SIGNAGE
MANDALIKA
RESORT

ROAD
PROVINCE
SIGNAGE
EAST GATE

0+000
SECURITY
POST SECURITY
PARKING

-0+000.00 STA.1+000

0+000 BP: MATCHLINE

0+050

EMEREGENCY
BAY

BP:
0+025
PALM GRID

0+00
AVENUE

1+050
0+050

0+100

PELAT
INJAK

SONGGONG RIVER 0+075

PELAT
INJAK

INJAK

0+100
PELAT
INJAK
PELAT
0+150

0+125

0+176.80
/h

0+150
INJAK
LAWN
ROW

PELAT
INJAK

Mid:
PELAT
= 45000

0+175
0+02

0+200
km

0+225
GOLF 0+250
LAWN
HALTE BUS
PEDESTRIAN ACCESS
(ECO TRAIL)

DRAIN

0+250
5
PARKING 10
BAY

0+275

EP: 0+370.17
TOILET PAVEMENT

INJAK
0+300
TENANT

INJAK
PLAT

0+325
POND

PLAT
0+300

0+350

0+370.
PEDESTRIAN ACCESS
TO COMMERCIAL AREA

WOODEN
DECKING

0.00 D = 30
PAVEMENT TENANT

0+05
PARKING
BAY

HALTE BUS

0+350

0
ROUNDABOUT

650
WITH
SCULPTURE

0 0+400

PELAT

PELAT INJAK
INJAK
050
0

0+450

TOILET

LAWN

0+07
PAVEMENT
0+500
TENANT
INJAK
PLAT
WOODEN
100

16
DECKING

0
HALTE BUS
WOODEN
BRIDGE

6000
WOODEN

0+550
DECKING PELAT INJAK PLAT
INJAK

0+00 EE
5
PARKING
BAY

6800
PELAT INJAK

0+600
STA N SP

EAST LAGOON
WOODEN
BRIDGE

PELAT INJAK

0+650
POND

PELAT INJAK

PELAT INJAK

PELAT INJAK

PELAT INJAK
0+700
PELAT
INJAK

PELAT
INJAK

PLAN

PLAT
INJAK
PELAT INJAK

PLAT INJAK
PELAT

PELAT INJAK
INJAK

DESIG

ROOF

INJAK
0+750
INJAK

PELAT
BRIDGE

PELAT

INJAK
PELAT
6800

PELAT
INJAK
0+800

-0+000
DESIGN SPEED = 20 km/h
BP: -0+000.00
STA 0+000.00
Mid: 0+006.20

0+12
PCC: 0+012.39

0+025
6000 Mid: 0+038.24

0+050
LAWN

5 PRC: 0+064.09

0+075
TENANT

PARKING

0+100
BAY

TENANT
MEETING
POINT

0+125
(PAVEMENT)

PELAT
INJAK

0+150
PARKING
BAY PELAT INJAK

0+

1.73 m
KE SALURAN LUAR

3PIPA VENT STACK


FRAME

ROW

0+175
Mid:

= 45000
0+161.65

3
4.5 m
KE SALURAN
PIPA LUAR
VENT STACK

FRAME
LAWN

0+200
15 BR

BR
0+225

KE SALURAN LUAR
0+250

9.8 m
FRAME

PIPA VENT STACK


0+275

PRC:
R127500

0+300

0+259.21
POND

0+325
Mid:
0+326.80

0+350
0+
WOODEN
TENANT DECKING

PAVEMENT
CROSSING BRIDGE
(FOR PEDESTRIAN)
LAWN

0+375
ISLAND

17
PARKING HALTE BUS
BAY

ACCESS
TO PUBLIC BEACH POND

0+400
PCC: 0+394.38
HALTE BUS

5
Mid: 0+403.08

0+412
PARKING EP: 0+411.78
BAY

INJAK
PELAT
PELAT
INJAK
ROUNDABOUT
WITH
SCULPTURE

LAWN
TENANT

9.8 m
KE SALURAN
PIPA LUAR
VENT STACK

3 FRAME
0+
20
0
0+
22
5

FRAME

KE SALURAN
PIPA LUAR
VENT STACK

INJAK
9.8 m

PELAT
3

INJAK
PELAT
0+25
0
0+275

KE SALURAN
PIPA LUAR
VENT STACK
9.8 m

3
FRAME

PLAT
INJAK
PLAT
INJAK

0+

0+000.00
30
0+000

BP:
km/h
0+025

= 30
0+050
0+075

SPEED

6000
6800
0

0+000.00
DESIGN

PLAN
ROOF
6800
0+125

STA
6000

0+150

0+175

0+200

0+225

0+250

0+275

0+300
0+325
0 4.949

0+325

0+350
0+375
0+400
0+425
0+450
0+475
0+500
0+525
0+550
0+575
0+600
0+625
0+650
0 4.949

0+675
0+700
0+725
0+350

0+750
0+775
0+800
0+825
0+850
0+875

0+900
0+925
0+950
EP:

2.009
0+952.010

0+375
PROJECT :

0+400
0+425
THE MANDALIKA URBAN AND

0+45
0
0+
TOURISM INFRASTRUCTURE

47
5
w e
0+
50
0

0+
PROJECT (MUTIP)

52
5
0+55
0
0+575
EMPLOYER

0+600
s

0+62
5
0+
65
0
0+
67
5
0+
70
0
0+
25 7
0+
75
0
0+
77
5
0+
00 8
0+
PT. Indonesia Tourism Development Corporation

25 8
0+
85
0
0+
87
5
V2
0+
90
0
CONSTRUCTION MANAGEMENT CONSULTAN

0+
92
5
0+
95
0
2.009
EP
:0
+9
52
.0
10

JAYA CM
ENGINEERS AND CONSULTING ENGINEERS

OWNER ENGINEER MANAGING DIRECTOR

Romeo D. Acedilla Bram Subiandoro

CONTRACTOR :

5 0+650 0+675 0+700 0+725 0+750 0+775 0+800PT. HUTAMA KARYA

0 +62 PT. ADHI KARYA, JO

00 PACKAGE - 2
6
0+ SHOP DRAWING
Name Date & Sign

75
Drawn by Abdul Gani
AREA LONGSOR AREA LONGSOR

+ 5 Checked by Rai Pramana

0 Accepted by
DRAWING TITLE :
Arief Indriyanto

PLAN RETAINING WALL V-V2

SCALE :

1 : 1000

DRAWING NUMBER : REVISION :

DRAWING REFERENCE :

-
NOTES AND KEY PLAN :

12.00
0+625
11.00

10.00 5134 500 ROW 13500
534
500

9.00 SIDEWALK CARRIAGEWAY SIDEWALK


1500 1500 3750 3750 1500 1500
8.00 BIORETENTION

MARKING
250 250
7.00 200 200
PROJECT :
6.00 3% -3%

5.00 THE MANDALIKA URBAN AND


4.00 PROPOSED RETAINING WALL+DRAINAGE
TOURISM INFRASTRUCTURE
3.00 PROJECT (MUTIP)
2.00 EMPLOYER

1.00
DATUM 0.00

5.855

5.838

6.369 5.717

5.605

5.566

5.539
5.805 5.812
8.470

5.881
PLAN ELEVATION

7.697
7.750

8.619
8.702

6.823

6.228

5.638
5.276
EXISTING ELEVATION
PT. Indonesia Tourism Development Corporation

DISTANCE POINT 1.000 4.000 0.5002.000 9.200 6.800 1.000 10.000 1.000
CONSTRUCTION MANAGEMENT CONSULTAN

-16.700
-15.700

-11.700
-11.200

-9.200

17.800
18.800
0.000

6.800
7.800
CUMULATIVE DISTANCE

PLAN ELEVATION
GRUBBING
JAYA CM
ENGINEERS AND CONSULTING ENGINEERS

OWNER ENGINEER MANAGING DIRECTOR

12.00
0+650
11.00 ℄
10.00 3761 500 ROW 13500 500 2256 Romeo D. Acedilla Bram Subiandoro
9.00 SIDEWALK CARRIAGEWAY SIDEWALK
CONTRACTOR :
1500 1500 3750 3750 1500 1500
8.00 BIORETENTION

MARKING
250 250
200 200
7.00
6.00 3% -3%

5.00
4.00 PROPOSED RETAINING WALL+DRAINAGE

3.00 PT. HUTAMA KARYA

2.00 PT. ADHI KARYA, JO


1.00
DATUM 0.00
PACKAGE - 2
8.091 5.781

8.159 5.794
5.755

7.465 5.643

7.380 5.531

5.492

5.465

6.701
7.783

PLAN ELEVATION

SHOP DRAWING
7.63

6.773

6.615
EXISTING ELEVATION
Name Date & Sign

DISTANCE POINT 6.000 2.000 5.000 3.500 1.000 11.000 Drawn by Abdul Gani
Checked by Rai Pramana
-13.000

15.500
3.500
-5.000

4.500
-7.000

0.000

Accepted by Arief Indriyanto


CUMULATIVE DISTANCE
DRAWING TITLE :

PLAN ELEVATION PLAN RETAINING WALL V-V2


GRUBBING
SCALE :

1 : 1000

DRAWING NUMBER : REVISION :

DRAWING REFERENCE :

-
NOTES AND KEY PLAN :

12.00
11.00 0+675

10.00 4394 500 ROW 13500 500 1833
PROJECT :
9.00 SIDEWALK CARRIAGEWAY SIDEWALK
1500 1500 3750 3750 1500 1500
8.00 BIORETENTION BIORETENTION
THE MANDALIKA URBAN AND

MARKING
250 250
7.00 200 200
TOURISM INFRASTRUCTURE
6.00 -3% -3%
PROJECT (MUTIP)
5.00
EMPLOYER
4.00
PROPOSED RETAINING WALL+DRAINAGE
3.00
2.00
1.00
DATUM 0.00

6.372
5.437

5.464
9.764 5.502

7.124 5.615

5.503

5.464

6.596 5.437
7.676
PLAN ELEVATION PT. Indonesia Tourism Development Corporation

7.417

8.564

5.842
EXISTING ELEVATION CONSTRUCTION MANAGEMENT CONSULTAN

DISTANCE POINT 6.000 3.000 4.000 7.000 7.000

-13.000

14.000
JAYA CM

-7.000

-4.000

7.000
0.000
CUMULATIVE DISTANCE
ENGINEERS AND CONSULTING ENGINEERS

PLAN ELEVATION
GRUBBING
OWNER ENGINEER MANAGING DIRECTOR

Romeo D. Acedilla Bram Subiandoro


12.00
CONTRACTOR :
11.00 0+725

10.00 ℄
7502 500 ROW 13500 500 2548
9.00
SIDEWALK CARRIAGEWAY SIDEWALK
8.00 1500 1500 3750 3750 1500 1500
BIORETENTION BIORETENTION

MARKING
250 250
7.00 200 200
6.00 PT. HUTAMA KARYA
-3% -3%
5.00 PT. ADHI KARYA, JO
4.00
3.00 PROPOSED RETAINING WALL+DRAINAGE

2.00
PACKAGE - 2
1.00
DATUM 0.00 SHOP DRAWING

6.381
8.905

9.021 5.082

5.109

5.148

6.882 5.260

5.148

5.109

6.52 5.082
Name Date & Sign
PLAN ELEVATION
Drawn by Abdul Gani
8.871

6.222

5.573
EXISTING ELEVATION Checked by Rai Pramana
Accepted by Arief Indriyanto
DISTANCE POINT 10.000 7.000 7.000 6.000 7.000 DRAWING TITLE :

PLAN RETAINING WALL V-V2


-17.000

20.000
13.000
0.000
-7.000

7.000

CUMULATIVE DISTANCE
SCALE :

1 : 1000
PLAN ELEVATION
GRUBBING
DRAWING NUMBER : REVISION :

DRAWING REFERENCE :

-
NOTES AND KEY PLAN :

12.00
11.00 0+750
10.00 ℄
4514 500 ROW 13500 500 1315
9.00
SIDEWALK CARRIAGEWAY SIDEWALK
8.00 1500 1500 3750 3750 1500 1500
BIORETENTION BIORETENTION

MARKING
7.00 250 250 PROJECT :
200 200
6.00
-3% -3% THE MANDALIKA URBAN AND
5.00
TOURISM INFRASTRUCTURE
4.00
PROJECT (MUTIP)
3.00 PROPOSED RETAINING WALL+DRAINAGE

2.00 EMPLOYER

1.00
DATUM 0.00

7.851 4.962

4.989

4.989

5.732 4.962
5.028

6.073 5.140

5.028

5.633
7.263
PLAN ELEVATION

6.314

6.160

6.437
7.110

5.351
EXISTING ELEVATION
PT. Indonesia Tourism Development Corporation

DISTANCE POINT 3.000 5.000 1.000 6.000 7.000 7.000 6.000


CONSTRUCTION MANAGEMENT CONSULTAN

-22.000

-19.000

-13.000
-14.000

-7.000

0.000

7.000

6.000
CUMULATIVE DISTANCE

PLAN ELEVATION
GRUBBING
JAYA CM
ENGINEERS AND CONSULTING ENGINEERS

OWNER ENGINEER MANAGING DIRECTOR

Romeo D. Acedilla Bram Subiandoro


12.00
CONTRACTOR :
11.00
0+775
10.00 ℄ 500
9.00 2196 500 ROW 13500 299

SIDEWALK CARRIAGEWAY SIDEWALK


8.00 1500 1500 3750 3750 1500 1500
7.00 BIORETENTION BIORETENTION

MARKING
250 250
200 200
6.00 PT. HUTAMA KARYA
-3% -3%
5.00 PT. ADHI KARYA, JO
4.00
3.00 PROPOSED RETAINING WALL+DRAINAGE
2.00
PACKAGE - 2
1.00
DATUM 0.00 SHOP DRAWING
6.045 4.832

4.859

4.859

4.693 4.832
4.680
5.952

4.925 5.010

Name Date & Sign


PLAN ELEVATION
Drawn by Abdul Gani
5.663

4.455
4.218
EXISTING ELEVATION Checked by Rai Pramana
Accepted by Arief Indriyanto
DISTANCE POINT 10.000 7.000 7.000 10.000 1.000 DRAWING TITLE :

PLAN RETAINING WALL V-V2


-17.000

17.000
18.000
-7.000

0.000

7.000

CUMULATIVE DISTANCE
SCALE :

1 : 1000
PLAN ELEVATION
GRUBBING
DRAWING NUMBER : REVISION :

DRAWING REFERENCE :

-
NOTES AND KEY PLAN :

PROJECT :

THE MANDALIKA URBAN AND


TOURISM INFRASTRUCTURE
PROJECT (MUTIP)
EMPLOYER

PT. Indonesia Tourism Development Corporation


2635 1500
CONSTRUCTION MANAGEMENT CONSULTAN
335 750 1000 250 300 200 1300

JAYA CM
ENGINEERS AND CONSULTING ENGINEERS

OWNER ENGINEER MANAGING DIRECTOR

Romeo D. Acedilla Bram Subiandoro

1500
SIDEWALK CONTRACTOR :

300

300
500
PT. HUTAMA KARYA
PT. ADHI KARYA, JO

PACKAGE - 2

SHOP DRAWING
Name Date & Sign
Drawn by Abdul Gani
Checked by Rai Pramana
Accepted by Arief Indriyanto
DRAWING TITLE :

PLAN RETAINING WALL V-V2

SCALE :

1 : 1000

DRAWING NUMBER : REVISION :

DRAWING REFERENCE :

-
THE MANDALIKA URBAN AND TOURISM INFRASTRUCTURE PROJECT (MUTIP)

SITE INSPECTION REPORT


(Berita Acara Lapangan ) MUTIP SUPERVISION TEAM
No: 74/SIRC/JO/MUTIP-P2/XII/2022

On this day,
Dated (Tanggal) : 30 Month (Bulan) : December Year (Tahun) : 2022
Package :2
Location : V-V2
Subject : Drainage V-V2

The undersign belows, has held inspection on site with description as follows :
(Yang bertanda tangan dibawah ini, telah melakukan inspeksi di site dengan deskripsi sebagai berikut)
:
1. Additional Box 1x1, DPT & U-Ditch behind Gerupuk Elementary School from the edge of the fence up to PJU

2. Cover U-Ditch at north of Gerupuk Elementary School to be opened and cleaned


3. Making swale from the first turn

In witness whereof, this report made in 3 duplicate(s), to be used as necessary.


(Demikian, Berita Acara ini dibuat dalam 3 rangkap, untuk dipergunakan sebagaimana mestinya).

Contractor, CM Consultant,
HUTAMA-ADHI JO PT. Jaya CM ITDC Others

had been sign by all parties in original form (attached)

(……………………..) (….................................) (…............................) (…............................)


THE MANDALIKA URBAN AND TOURISM INFRASTRUCTURE PROJECT (MUTIP)

SITE INSPECTION REPORT


(Berita Acara Lapangan ) MUTIP SUPERVISION TEAM
No: 73/SIRC/JO/MUTIP-P2/XII/2022

4. Additional fill at area P10 V-V2 along the parking lot

5. Carry out cleaning and making swale after Parking 10A


6. Create DPT on left side form from STA 0+625 - 0+675 (will be RFI)

In witness whereof, this report made in 3 duplicate(s), to be used as necessary.


(Demikian, Berita Acara ini dibuat dalam 3 rangkap, untuk dipergunakan sebagaimana mestinya).

Contractor, CM Consultant,
HUTAMA-ADHI JO PT. Jaya CM ITDC Others

had been sign by all parties in original form (attached)

(……………………..) (….................................) (…............................) (…............................)


THE MANDALIKA URBAN AND TOURISM INFRASTRUCTURE PROJECT (MUTIP)

SITE INSPECTION REPORT


(Berita Acara Lapangan ) MUTIP SUPERVISION TEAM
Documentation
SITE INSPECTION REPORT
(Berita Acara Lapangan ) MUTIP SUPERVISION TEAM
Documentation
SITE INSPECTION REPORT
(Berita Acara Lapangan ) MUTIP SUPERVISION TEAM
Documentation

You might also like