Project Name: Date: No. of Sheets: Check / Verify the following items to initiate QC level III process Drawings & documents related to the stage have been Special requirements are addressed saved on LAN Stage deliverables as per contract are covered Clash detections and validation reports are verified Interdepartmental revision & QC2 process are completed Client comments tracking matrix form is checked Reference Comment Sheet Action No. No. Comments PA/PE Feedback DWG/ DOC Category Evaluation By
Comment categories: C1- Conflict with design input data C2- Conflict with codes, regulations & standard C3- Design defect / enhancement C4- Missing data / output consistency C5- Mis coordination with other disciplines C6- Presentation Evaluation of discipline category (By QC reviewer): ( ) Sheet evaluation / Discipline categories: (A) Can be submitted (B) Can be submitted with minor comments (C) Cannot be submitted before implementing the resulted QC level III comments (D) The project is rejected and cannot be submitted Comments/ Initial/No./Signature Date Approvals Initial/No./Signature Date Implementation QC Reviewer : SM/SH: Senior/Lead: PM:
Approved by Quality Control Manager : …………………………………