This form shall be initiate and controlled by PA - (BUILDINGS)

The form to be completed and signed by all participants and comments should be added on the remarks column.

Project Name: …………………………………. Project No.: ………………………………

Sr. Item description Check Discipline Remarks

General Drawings

1 Site dimension indicated or covered in drawings and as per land kroki. CE,LS

2 Built up area according with regulations. AR

3 Drawing index in cover sheet matches the drawings title. ALL

4 Others (specify)

Site work
Check existing levels vs. finish grade level, identify abnormality in the
1 CE,AR
levels, and check site levels optimization.
Check retaining structures (if any) locations to be optimized and
2 SE, CE,LS,AR
minimum.
Retaining structures height are properly considered by structural
3 CE,SE,AR
engineers
Auxiliary structural are covered in structural design shade, swimming
4 LS,SE,AR
pool, guard house, gazebo etc.
Soil report recommendation regarding shoring, ground water table, site
5 drainage, planting type / location and any special requirements is CE,LS,PG
considered.

6 Settings out points for all elements / buildings are included. CE

7 Site drainage is properly designed. CE,PG,LS

8 Plant list matches the weather condition. LS

9 Planting is in accordance with client requirement checklist. LS


Hardscape material selection is in accordance with client requirement
10 LS
checklist.
All facilities’ requirements are included in the site plan, (i.e. Electrical LS,HC,LC,PG,
11
rooms, gas tanks, water tanks, holding tank, swimming pool utilities etc.) ME,CE,AR
HC,LC,PG,ME
12 Overlap utilities to check that routes are not contradicting each other.
,CE,LS
Overlap utilities to check that hand holes and manhole are not
13 HC,LC, PG,CE
contradicting.
Overlap utilities to check that tanks location are not contradicting HC,LC,PG,CE,
14
electrical utilities. LS,SE
Check lighting layout distribution with planting, entrances and special
15 LS,HC
features.
16 Check cable routing & crossing. HC

17 Limitation on Property line and setbacks CE,LS ,AR

18 Others (specify)
This form shall be initiate and controlled by PA - (BUILDINGS)
The form to be completed and signed by all participants and comments should be added on the remarks column.

Project Name: …………………………………. Project No.: ………………………………

Sr. Item description Check Discipline Remarks


Buildings (specify building numbers)
Basement
Check requirements of soil report related to foundation design and
1 SE
levels
2 Check plumbing utilities in relation with foundation levels. PG,SE

Check requirement of soil report related to basement perimeter


3 SE,PG
drainage (if any) and tanking system, etc.
4 Check sump pit requirements with structural engineer SE,PG

5 Check foundation overlap with each other and with property line. SE

6 Check head room at basement entrance and critical points. ALL

7 Others (specify)

Floors
Handicapped requirements incorporated, (i.e. Door width, ramps slopes,
1 AR,SE
etc.).

2 Structural column location and sizing in relation to walls and openings AR,SE

Mechanical, plumbing and electrical chases locations and dimensions SE,AR,ME,PG


3
coordinated in drawings. ,HC,LC

4 Exposed structural elements treatment in architectural. AR,SE


Architectural elements are solved structurally, (i.e. Arches, drop panels,
5 AR,SE
lintel beams, large openings etc.).

6 Fire rated walls coordinated with all the concerned departments. AR,ME

All mechanical equipment i.e. HVAC, Heaters, Pump, etc. Are having all
7 HC,PG,ME
necessary power, grounding sources.
Fire safety requirement incorporated, (i.e. Fire egress and stair cases,
8 AR,PG,HC,LC
panic doors, portable fire extinguishers, agents cylinders location etc).
9 Outdoor areas properly drained. AR,PG

10 Finish materials are aligned with client requirement checklist. AR,ID

11 Doors action, finish, details and hardware. AR,ID

12 Windows operation and maintenance satisfactory. AR


Curtains and shutters treatment satisfactory and power supplied as
13 AR,HC
required.
14 Area drains and floor drain location coordinated. AR,PG
Wall construction communicated through all concerned (structural,
15 AR,SE,ME,PG
HVAC and others).
Façade special requirements addressed (i.e. Recess, drop panels,
16 AR,SE
parapet)
17 Finishing grades (floors, hardware etc.) are considered throughout the AR,ID
This form shall be initiate and controlled by PA - (BUILDINGS)
The form to be completed and signed by all participants and comments should be added on the remarks column.

Project Name: …………………………………. Project No.: ………………………………

Sr. Item description Check Discipline Remarks


project (formal, family, secondary elements).
Electrical panel boards location coordinated ventilated and necessary
18 HC,LC,HVAC
provisions maintained.
Electrical outlets (power, low current etc.) and switches distribution
19 HC,LC,ID
acceptable to function and furniture.
External lighting and drains of balconies and projections are properly
20 AR,PG,HC
located.
21 Others (specify)

Ceiling
Ceiling plan includes all utilities if required (lights, A/C outlets, low ID,AR,ME,HC,
1
current system etc.). LC,PG

2 Ceiling material and design in accordance with requirement. AR,ID

Ceiling space enough for the passages of utilities (structural members, ID,AR,SE,ME,
3
HVAC duct, pipes and electrical utilities). HC,LC,PG
SE,ME,AR,HC
4 Duct, piping and other utility routings crossing checked
,LC,PG
Special fire requirements in ceiling space (sprinklers, smoke detectors,
5 PG, AR,LC,HC
… etc.) are incorporated

6 Cable routing in ceiling checked. HC

7 Others (specify)

Roof
Roof drainage layout optimized for drain points number and screed
1 AR,PG,SE
thickness.
Drain point location acceptable with building
2 AR,PG
Surrounding and elevation.
3 Power to equipment coordinated. ME,HC

4 Grounding of equipment is provided (if required). HC

5 Drainage layout considers the equipment location. PG,ME

6 Roof openings are of no major implication with others. ME,AR,SE

7 Parapet heights adequate to hide equipment. AR,ME

8 Electrical utilities routing coordinated with others. HC


Façade cleaning machines provided as required, power demands
9 AR,SE,HC
checked, AR and SE related considerations and details checked.
10 Others (specify)

General Comments (specify)


This form shall be initiate and controlled by PA - (BUILDINGS)
The form to be completed and signed by all participants and comments should be added on the remarks column.

Project Name: …………………………………. Project No.: ………………………………

Sr. Item description Check Discipline Remarks

Discipline No. Initial Signature Date

AR

ID

SE

HVAC

PG-FF

Wet utilities

EE-HC

EE-LC

LS

CE & Roads

Solid waste

PA