Professional Documents
Culture Documents
The form to be completed and signed by all participants and comments should be added on the remarks column.
General Drawings
1 Site dimension indicated or covered in drawings and as per land kroki. CE,LS
4 Others (specify)
Site work
Check existing levels vs. finish grade level, identify abnormality in the
1 CE,AR
levels, and check site levels optimization.
Check retaining structures (if any) locations to be optimized and
2 SE, CE,LS,AR
minimum.
Retaining structures height are properly considered by structural
3 CE,SE,AR
engineers
Auxiliary structural are covered in structural design shade, swimming
4 LS,SE,AR
pool, guard house, gazebo etc.
Soil report recommendation regarding shoring, ground water table, site
5 drainage, planting type / location and any special requirements is CE,LS,PG
considered.
18 Others (specify)
This form shall be initiate and controlled by PA - (BUILDINGS)
The form to be completed and signed by all participants and comments should be added on the remarks column.
5 Check foundation overlap with each other and with property line. SE
7 Others (specify)
Floors
Handicapped requirements incorporated, (i.e. Door width, ramps slopes,
1 AR,SE
etc.).
2 Structural column location and sizing in relation to walls and openings AR,SE
6 Fire rated walls coordinated with all the concerned departments. AR,ME
All mechanical equipment i.e. HVAC, Heaters, Pump, etc. Are having all
7 HC,PG,ME
necessary power, grounding sources.
Fire safety requirement incorporated, (i.e. Fire egress and stair cases,
8 AR,PG,HC,LC
panic doors, portable fire extinguishers, agents cylinders location etc).
9 Outdoor areas properly drained. AR,PG
Ceiling
Ceiling plan includes all utilities if required (lights, A/C outlets, low ID,AR,ME,HC,
1
current system etc.). LC,PG
Ceiling space enough for the passages of utilities (structural members, ID,AR,SE,ME,
3
HVAC duct, pipes and electrical utilities). HC,LC,PG
SE,ME,AR,HC
4 Duct, piping and other utility routings crossing checked
,LC,PG
Special fire requirements in ceiling space (sprinklers, smoke detectors,
5 PG, AR,LC,HC
… etc.) are incorporated
7 Others (specify)
Roof
Roof drainage layout optimized for drain points number and screed
1 AR,PG,SE
thickness.
Drain point location acceptable with building
2 AR,PG
Surrounding and elevation.
3 Power to equipment coordinated. ME,HC
AR
ID
SE
HVAC
PG-FF
Wet utilities
EE-HC
EE-LC
LS
CE & Roads
Solid waste
PA