Sl.No forParameters
Construction of Electrical
to be Checked Plants and Electric Lines Regulations, 2010. OK NOT OK Remarks, if any
A DESIGN UNITS
1 All Design units are as per Standard International (SI) Metric System
B DESIGN ASSUMPTIONS
1 General design Methodology is provided
2 All Design assumptions are clearly described
C DESIGN PARAMETERS
1 Concrete & Reinforcement grades
2 Soil Unit weight is provided
3 Young's modulus is provided
D DESIGN LOADS
1 Design Loads are as per Project Design Basis /IS Codes
2 Dynamic loads are as Per Vendor Data for Heavy Rotating Equipment
3 Thermal loads are as per Project Design Basis
Load combinations for Allowable Stress Design are as per Project Design Basis ,
4 IS Codes
Load combinations for Ultimate Strength Design are as per Project Design Basis
5
, IS Codes
E 33kV HG FUSE FOUNDATION DESIGN
Concrete shall conform to the requirements mentioned in IS: 456 and all the
tests shall be conducted as per relevant Indian Standard Codes as mentioned in
1 Standard field quality plan appended with the specification. A minimum grade
of M25 concrete shall be used for all structural/load bearing members as per
latest IS: 456 (latest revision).
The switchyard foundation's plinths shall be minimum 300mm above finished
2
yard level.
Minimum 75mm thick lean concrete (1:4:8) shall be provided below all
3 underground structures, foundations, trenches etc. to provide a base for
construction.
Concrete made with Portland cement shall be carefully cured and special
4 importance shall be given during the placing of concrete and removal of
shuttering.
The design and detailing of foundations shall be done based on the approved
5 soil data and sub-soil conditions as well as for all possible critical loads and the
combinations.
Limit state method of design shall be adopted unless specified otherwise in the
6
specification.
For detailing of reinforcement IS: 2502 and SP: 16 shall be followed. TMT bars
7 conforming to IS: 1786 shall be used as reinforcement. However, in specific
areas mild steel (Grade I) conforming to IS: 432 can also be used.
Foundations shall be designed for the critical loading combination of the steel
8
structure and or equipment and/or superstructure.
If required protection to the foundation, shall be provided to take care of any
9 special requirements for aggressive alkaline soil, black cotton soil or any soil
which is detrimental/harmful to the concrete foundations

All structures shall be checked for sliding and overturning stability during both
10 construction and operating conditions for various combination of loads

For checking against overturning, weight of soil vertically above footing shall be
11 taken and inverted frustum of pyramid of earth on foundation should not be
considered
The tower and equipment foundations shall be checked for a factor of safety of
12 2.2 for normal condition and 1.65 for short circuit condition against sliding,
overturning and pullout.
Earth pressure for all underground structures shall be calculated using
coefficient of earth pressure at rest. Co-efficient of active or passive earth
13 pressure (whichever is applicable). However, for the design of substructures of
any underground enclosures, earth pressure at
rest shall be considered.
The foundations shall be proportioned so that the estimated total and
14 differential movements of the foundations are not greater than the movements
that the structure or equipment is designed to accommodate.
15 Grout is needed to adjust the level
16 Grout to transfer the load from steel to foundation
Grout should have design compressive strength at least twice the strength of
17
fondation concrete.
When base plates become larger then 600mm, it is recommended that one or
18
two grout holes be provided to allow the grout to flow easier
Non-shrink grout are recommended to use for grouting of major steel
19
structures and stationary equipment.
F CALCULATION PRESENTATION
Calculations Cover Sheet with Document Number, Project title, Caculation
1
Subject, Date, etc. is provided
2 Name of calculation originator/Checker on Claculation Sheets
3 Subject of Structural Calculations
Reference drawing number,Table of contents , List of appilcable coded,&
4
Standards .
General description of Structure design Methodology/Design Criteria /Primary
5
Loads Definition
G DRAWING
1 Check North Direction, Check Scale, Check units, Check Grid Dimensions
The information within the Title Block of each drawing has been reviewed for
2 accuracy including the “Designed By”, “Drawn By”, “Checked By” and “File No.”
fields.
The Index Sheet has been coordinated with the current list of
3 architectural drawings with respect to drawing number and title.
A drawing has been included to identify abbreviations and symbols utilized on
4 the project drawings and have been coordinated with the other architectural
drawings for compliance.
5 Loading plans, vertical loads layout
Deviations, if any
1
Short circuit force shall be considered .
2
Clearance shall be confirmed by electrical designer.
3
4

Verification team
Reviewed & Verfied by Approved & Accepted by
Remarks
Name
Date
Sign.

Digitally signed by
Rupesh Khandekar
Date: 2021.05.11
16:15:01 +05'30'

Prepared by Reviewed by Accepted by


Rupesh Khandekar Jagadish Ghogare Pravinkumar Patil