DOC. No. QCI - 11. REV.0.

BLOCK ERECTION
INSPECTION
HULL NO. : BLOCK : DATE :
VESSEL NAME :

S/No. DESCRIPTION YES

1 IS THE PANEL/TANK IN A CLEAN CONDITION ?

2 IS ALIGNMENT ACCEPTABLE AS PER __________ ?

3 IS DISTORTIONS ACCEPTABLE TO _____________ ?

4 IS WELDING ACCEPTABLE ?

5 IS DIMENSION TAKEN ?

6 HAVE ALL TEMPORARY STIFFENERS REMOVED AND SCARS


PROPERLY GROUND ?

THE ABOVE ARE VERIFIED AND FOUND TO BE WITHIN THE ACCEPTABLE CRITERIA'S OF
____________________

REMARKS NAME / SIGNATURE DESIGNATION DATE

DISTRIBUTION : TRADE SUP. PROJ.SUPT. CLASS. OR . QC. FILE

/QC/SHARE/Qc_form-QCI-11.REV.0
DOC. No. QCI - 11. REV.0.

ERECTION / INSTALLATION
INSPECTION
HULL NO. : BLOCK / ITEM : DATE :
PROJECT :

S/No. DESCRIPTION YES

1 IS THE STRUCTURE INSTALLED AS PER LATEST DWG. ?


Please fill dwg. No:

2 IS ALIGNMENT ACCEPTABLE AS PER __________ ?

3 IS DISTORTIONS ACCEPTABLE TO _____________ ?

4 IS WELDING ACCEPTABLE ?

5 IS THE FINAL DIMENSION TAKEN ?

6 HAVE ALL TEMPORARY STIFFENERS REMOVED AND SCARS


PROPERLY GROUND ?

THE ABOVE ARE VERIFIED AND FOUND TO BE WITHIN THE ACCEPTABLE CRITERIA'S OF
____________________

REMARKS NAME / SIGNATURE DESIGNATION DATE

DISTRIBUTION : TRADE SUP. PROJ.SUPT. CLASS. OR . QC. FILE

/QC/SHARE/Qc_form-QCI-11.REV.0