Professional Documents
Culture Documents
_______________________ ________________________
DATE OF APPLICATION DATE ISSUED
LOCATION OF CONSTRUCTION:
ACTION TAKEN:
PERMIT IS HEREBY GRANTED SUBJECT TO THE FOLLOWING CONDITIONS:
1. THAT THE PROPOSED CONSTRUCTION / ADDITION / REPAIR / RENOVATION /
DEMOLITION / INSTALLATION
ETC. SHALL BE IN CONFORMITY WITH THE NATIONAL BUILDING CODE (P.D. 1096)
AND ITS CORRESPONDING IMPLEMENTING RULES AND REGULATIONS
2. THAT A DULY LICENSED ARCHITECT / CIVIL ENGINEER HAS BEEN ENGAGED TO
PREPARE PLANS AND SPECIFICATIONS AND UNDERTAKE THE SUPERVISION /
INSPECTION OF THE CONSTRUCTION OF THE PROJECT.
3. THAT A CERTIFICATE OF A COMPLETION DULY SIGNED AND SEALED BY THE
DESIGNING ARCHITECT / ENGINEER AND ARCHITECT / ENGINEER IN-CHARGE OF
CONSTRUCTION SHALL BE SUBMITTED NOT LATER THAN SEVEN (7) DAYS AFTER
COMPLETION OF THE CONSTRUCTION OF THE PROJECT.
4. THAT A “CERTIFICATE OF OCCUPANCY” SHALL BE SECURED PRIOR TO ACTUAL __________________________________________________
OCCUPANCY OF THE BUILDING MUNICIPAL ENGINEER / BUILDING OFFICIAL
__________________________________________________
DATE
NOTE:
THIS PERMIT MAY BE CANCELLED OR REVOKED PURSUANT TO SECTIONS 305 & 306 OF THE “NATIONAL BUILDING CODE.”
To be accomplished in five copies one each for: Applicant Original, Assessor, Philippine Statistics Authority, Building Official and Fire Department.
BOX 3A (TO BE ACCOMPLISHED BY DESIGNING ARCHITECT/CIVIL ENGINEER IN PRINT)
TOTAL ESTIMATED COST COST OF NUMBER OF STOREY
EQUIPMENT
BUILDING P ___________________ TOTAL FLOOR AREA
INSTALLED
ELECTRICAL P ___________________ P ____________ PROPOSED DATE
OF CONSTRUCTION
P ____________
MECHANICAL P ___________________
P ____________ EXPECTED DATE OF
PLUMBING P ___________________ COMPLETION
MATERIAL OF CONST
OTHERS P ___________________
(WOOD, CONC., STEEL, MIXED)
TOTAL COST P ___________________
ASSESSED FEES
LAND USE/ZONING
BUILDING
PLUMBING
ELECTRICAL
MECHANICAL
OTHERS REVIEWED:
PROGRESS FLOW
NOTED: IN OUT
ACTION / PROCESSED
CHIEF, PROCESSING DIVISION / SECTION
REMARKS BY
TIME DATE TIME DATE
ARCHITECTURAL
STRUCTURAL
SANITARY / PLUMBING
ELECTRICAL
WE HEREBY AFIX OUR HANDS SIGNIFYING OUR CONFORMITY TO THE INFORMATION HEREIN ABOVE SETFORTH
BOX 6 BOX 8
PRINT NAME
ADDRESS
APPLICANT
SIGNATURE
WITH MY CONSENT
BOX 7 BOX 9 (TO BE ACCOMPLISHED BY LOT OWNER)
ADDRESS ADDRESS