The document is a checklist for reinforced cement concrete (RCC) work. It contains 13 items to check related to materials, layout, reinforcement, shuttering, clearances, resources, and lighting for night work. The checklist ensures that all requirements are met to receive approval for the RCC pour. Key items include verifying aggregate quality, reinforcement placement matches plans, formwork dimensions and levels are correct, and necessary equipment and labor are available.
The document is a checklist for reinforced cement concrete (RCC) work. It contains 13 items to check related to materials, layout, reinforcement, shuttering, clearances, resources, and lighting for night work. The checklist ensures that all requirements are met to receive approval for the RCC pour. Key items include verifying aggregate quality, reinforcement placement matches plans, formwork dimensions and levels are correct, and necessary equipment and labor are available.
The document is a checklist for reinforced cement concrete (RCC) work. It contains 13 items to check related to materials, layout, reinforcement, shuttering, clearances, resources, and lighting for night work. The checklist ensures that all requirements are met to receive approval for the RCC pour. Key items include verifying aggregate quality, reinforcement placement matches plans, formwork dimensions and levels are correct, and necessary equipment and labor are available.
Project No.: Project Name: Form:5-6 (6.3) Dept. No.: Structure: Log No.: S. No Description of Item Status Remarks Yes No 1 Coarse and fine Aggregate is of approved quality and in required quantity. 2 Safe work Procedure for RCC available. 3 Layout of footings/columns done by contractor to be checked and accordingly site should be released for fixing of reinforcement & shuttering. 4 Check the Reinforcement steel as per Approved Bar Bending Schedule. 5 Cover blocks provided to reinforcement to be checked. 6 Shuttering dimensions, line, level & plumb to be checked. 7 Insert with lugs /foundation bolts/pockets if any to be checked 100% 8 Whether clearance from Electrical/Mechanical department is required. If yes, please take clearance from Elect/Mech. Engineer. 9 Whether Top level checked & marked. a Concrete top level b Insert top level c Bolt top level. 10 Concrete pour card to be collected from contractor. 11 Required resources like equipment & manpower to be checked to get quality workmanship. a Concrete pump & pipe line b Vibrator & needles c Mason with required tools & tackles. d Unskilled labour 12 Check & Record Extra Reinforcement Like Chair, laps, pin bars, spacer bars etc. 13 Lighting arrangement for Night Work (Permit Required for Night work) to be checked. CONTRACTOR CLIENT Date: Date: