Project: NH:37 Contract package – EW – II (AS-02/AS-18) Doc. no.

RW-CL-17
Rev. 0
Date
Received
Ref. RFI.
Checklist for : Kerb Casting Works
No:

Location : CH ________ to CH ________ Other Information :

Request Form No. :

Item Description CON CON SC Remarks


YES No Y N

1 Setting Out
a) Setting out checked?
b) Alignment checked?
c) Width of pavement checked?
d) All levels checked?

2 Type of kerb checked?

3 Kerb Casting
a) Kerb casting machine checked?
b) Source of concrete approved?
c) Grade of concrete checked?
d) Slump checked?

4 Alignment and shape acceptable?

5 FINAL INSPECTION P F
(with comments)

Signed for Contractor Designation : Date :

Signed for SC Designation : Date :

Please  off where appropriate