Original /
Item Type Drawing Descriptions Quantity Remark
Copies
项目 类型 绘图说明 数量 评注
原件/副本
- CK-PC-DWG-SHD-ELV-FAS-1040 :FIRE ALARM
Drawing
1 SYSTEM AND FIRE TELEPHONE PANEL DETAIL 2 2
施工图
CONNECTION
- CK-PC-DWG-SHD-ELV-FAS-1040.1 :FIRE ALARM
Drawing
1 SYSTEM AND FIRE TELEPHONE EQUIPMENT DETAIL 2 2
施工图
CONNECTION
Thanks and best regards.
谢谢和最好的问候
Forwarded For:
o For Comment & Reply For Construction For Sign and Stamp
o o
(用于评论和回复) (用于用于施工) (用于标志和邮票)
签名 Signature 签名 Signature
Notes:
2 signed copies must be submitted
(必须提交2份签名副本)
Page 1/2
One copy to be retained by the receiver and another copy to be returned signed by the receiver to the sender.
(一个副本由接收方保留,另一个副本由接收方签名返回给发送方 )