You are on page 1of 1

Acceptance Request Notification

Project: Avida Towers Riala Tower 2 ARN No: 056


Inspection Date :
Contractor: MDC 8.28-9.2.17
(Mon-Sat)
st
Location (Res. Floor): 1 residential floor Request Date: 8.29.17

Pre-Verification – Unit’s readiness verified by MDC QA / Contractor QA/QC

MONTH MON TUE WED THU FRI SAT

Aug 2017 28 29 30 31 Sep. 1 2

II
(Initial Ins.)

CCO
(conditional)
1,2,3,4,5,6,7,8,9,
FCO 10,11,12,14,15,
(Final/Accepta 16,17,18, 19, 20,
nce) 21,22,23,24

Requested By: Hanna J. Espinosa Position: QA Signature:

Audit Report - Remarks by Avida Quality Monitoring Unit


Residential
Unit Number Inspection Date Remarks
Floor
Not Ready
during Audit
(II/CCO/FCO)

II

CCO

FCO

QM: Date: Signature:

Noted By:

Name & Signature / Date: ____________________________ ____________________________


MDC COG MDC QA

Form Code: GEN-GEN-QMU-QMF-00001-3 Date: 6-17-2017