COMPLIANCE
S.NO. DESCRIPTION/ TOPIC REMARKS
Yes No N/A
1 Are the temporary bench marks established and approved by KEO/ QP?
2 Temporary bench mark referenced for this setting out:
3 Is the setting out in accordance to approved shop drawings?
Shop dwg. # and Rev
4 Is sufficient working space allowed around the construction area?
5 Safety:is the JHA or AHA approved by KEO/ QP?
6 Are the excavation levels marked out at site?
7 Equipments used:
NOTES/ REMARKS:
OHL-CL JV SECTION
AGENCY >>> OHL-CL JV SURVEYOR OHL-CL JV QC KEO
MANAGER
NAME
DATE
SIGNATURE