You are on page 1of 8

CONTRACTOR Job Code JEDDAH DOWNTOWN

COMPANY Doc. No. MBL


CONTRACTOR Doc. No. MS-01

Method Statement for LPG dismantling cylinder and pipe


Lines for EHD Facility Building

1 DOCUMENT ISSUE PURPOSE

For Approval for Information for Construction as Built For Internal

Approved for Owner / Engineer


Signature / Date Name

Page 1 of 9
Page 1 of 9
Revision History Sheet

Rev.
No. Section Descriptions Remarks

First issue.

Page 2 of 9
TABLE OF CONTENTS

1. INTRODUCTION

2. PRINCIPLES

3. RESPONSIBILITIES

4. DISMAINTALING PROCEDURE

5. QUALITY

6. MATERIAL

7. SAFETY

8. MANPOWER

9. RISK ASSESSMENT

10. CONCLUSION

Page 3 of 9
1. INTRODUCTION

The procedure for LPG at Jeddah Downtown.


Care will be taken in handling, transportation, during dismantling.

2. PRINCIPLES

The principle of this document is to ensure that all methods of LPG cylinder and Lines for EHD
facility building is detailed and complying with the standards.

3. RESPONSIBILITIES

It is the overall responsibility of MBL to organize resources according to approved Organization


Chart to perform construction activities as per project specification, in compliance with approved
quality plan and time schedule requirements. In addition to the routine involvement of Safety
Supervisor, Document controller, Equipment Supervisor in all activities will be the responsibility of
the following team:

A. Project Manager
B. Construction Manager
C. Q.C Engineer
D. Q.C Inspector
E. Site Engineer

4.Sequence of Operations for dismantling LPG cylinder and Lines


1. Arrive on site and receive site induction.
2. Erect appropriate signage.
3. Take receipt of relevant drawings.
4. Carry out a site survey.
5. Mark out “no go” zones.
6- Release pressure.
8. Remove branches valves and fittings.

Page 4 of 9
5. QUALITY ASSURANCE/ QUALITY CONTROL

Quality Control is a part of Quality Assurance, implements the latter by examining physical
characteristics and comparing them to established and acceptable quality documents as stated in the
quality plan.
Quality will be controlled by MBL in accordance with the approved quality documents.
It is the overall responsibility of MBL to organize resources according to approved Organization
Chart to perform construction activities as per project specification, in compliance with approved
Quality plan and time schedule requirements. In addition to the routine involvement of Safety
Supervisor, Document controller, Equipment Supervisor in all activities, Cracks Treatment Work will
be the responsibility of the following team.
• QC Inspector
• Site Engineer
• Surveyor
• Quality control Manager
QC Inspector should involve strict inspection, monitor and witnessing the activities in accordance
with the procedure and standards, Subcontractor approved procedure as mentioned in the scope of
work.

6. MATERIALS
The following material dismantling are black steel pipes and fittings.

7. SAFETY

Our primary goal to achieve an effective safety and loss prevention program is to protect the life,

health and safety of all personnel and eliminate the possibility of damage to property and equipment.

Management is responsible for the implementation of the company's "safety and loss prevention

Program". It is a corporate commitment that accidents causing injuries to People, damage to property

or loss of product can be prevented.

Page 5 of 9
To achieve these objectives, the following principles and practices will be applied.

• A safe working environment will be achieved by careful design of all facilities and purchase of

reliable equipment and by the elimination of works related to hazards. Where existing hazards

cannot be eliminated, their harmful effects will be minimized through environmental controls,

training in safe work methods, and by providing the reliable personal and protective equipment.

• The Site Engineer shall be responsible to ensure safety procedures are followed.

• Safety Officers will be at site at all times to carry out their duties.

• Employees will be continuously trained to develop and acquire the skills required in their Work

though daily toolbox talks/meetings.

• All personnel involved will use necessary PPE as required such as safety helmet, glasses, overall,

safety shoes, gloves, ear plugs, etc.

 Activities near or inside water will be executed with all the necessary precautions. Personal

flotation devices, life buoys, life rafts shall be provided and to be strictly implemented.

• Regular and thorough control of site, equipment, tools as well as working conditions and

procedures to ensure that all appropriate measures have been taken and that all necessary actions for

the elimination or the correction of unsafe or dangerous conditions, have been considered and

applied.

• Clear definition of individual personnel's and safety supervisor's duties and responsibilities.

• Execution of scheduled regular managers meeting in order to review the measures concerning

safety and wellbeing of the employees as well as review and analysis of the project safety system for

Eventual acquiring of additional measures and modifications of its safety manual.

• Issuing accident reports so that through analysis, their causes to conclude on omissions or required

corrective actions to avoid possible repetition of the said accident.

Page 6 of 9
• Recording and maintaining of all relevant documentation and accident reports in order to acquire

records for the total company's "safety".

• Every effort shall be made to assure that employees can accomplish their assigned scope of work

safely.

8. MANPOWER PLAN
NO Manpower
1 Mechanical Engineer
2 Foreman
3 Safety officer
4 Pipe fitter
5 General Labors

9. RISK ASSESSMENT

Control measures & Safety instructions must be followed by operatives on site as per risk

assessment plan.

10. CONCLUSION

As conclusion, MBL ensures that LPG Systems Line for EHD facility building will be conducted as

per project technical specification and standards and that extreme measure of safety will be applied

in order to avoid any site accident/incident.

Page 7 of 9