Sl No Description of Check Points Remarks
Yes No NA
13 Ensure the grouting is done in between the base plate and ground
Deviations to the drawing, if any, are indicated with Redline mark up on the
16
reference drawing
Remarks:
Signature of Sub - Contractor & Date Signature of TPL-FQE & Date Signature of Customer / Inspection Authority & Date
Format No. 08-03-05-FMT-I-FGS-CL-002-R00