You are on page 1of 1

INSTALLATION OF BEACON / HOOTER / Report No:

MANUAL CALL POINT (FIRE & GAS)


CHECK LIST Date:

Customer : Project : Project Code:


Sub- Contractor : WO No & Amndt, If any.:
Manufacturer : PO No & Amndt, If any.:
Item Description: Identification No.
Location : Sub Location:
Package: Drg No & Rev No :
FQP No. & Rev No. RFIC No.

Total Inspected & Total Inspected &


Total offered Quantity:
Accepted Quantity: Rejected Quantity:

Checked
Sl No Description of Check Points Remarks
Yes No NA

1 Approved Location drawing is available Drg No :

2 Approved Data Sheet is available Doc No :

3 Approved Typical drawing is available Drg No :

4 Make & type of Beacon / Hooter / MCP is approved by client

5 Sub Contractor is pre qualified and approved

6 Method Statement is approved by client

7 Ensure the Location is verified as per Location Drawing

8 Ensure the Beacon / Hooter / MCP is free from damages / defects

Ensure Supplied Beacon / Hooter / MCP specifications match with approved


9
Data Sheet

10 Ensure Tag plate is correct as per approved Drawings

Ensure Beacon / Hooter / MCP stand / stanchion is installed as per typical


11
drawing

12 Ensure the Stand is secured on the ground / platform.

13 Ensure the grouting is done in between the base plate and ground

14 Ensure Beacon is accessible for termination and display is prominently visible

15 Ensure the canopy is installed for MCP

Deviations to the drawing, if any, are indicated with Redline mark up on the
16
reference drawing

Remarks:

Signature of Sub - Contractor & Date Signature of TPL-FQE & Date Signature of Customer / Inspection Authority & Date
Format No. 08-03-05-FMT-I-FGS-CL-002-R00