You are on page 1of 1

HAWIYAH GAS PLANT EXPANSION PROJECT

DUMPER TRUCK INSPECTION CHECKLIST


Equipment Serial No: ______________ Equipment Certification Expiry Date: ____________ Inspection Month: _____________

Items to be inspected 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
Visual check on engine rotation and any
1
abnormal sound
2 Check engine oil and oil leak

3 Check cooling water and water leak

4 Cheeck brake for effective operation

5 Check steering for effective operation

6 Check control level for proper operation

7 Check hydraulic level and leak

8 Check hydraulic lines for leaks


Check fire extinguisher if in good
9
condition
Check for sight obstruction for the
10
operator e.g. curtain, plywood, cartoon,
Check reversing alarm , side and rear
11
mirrors
Check blinker light, tail light, signal light
12
and head light
13 Check general condition of tires/wheels

14 Temporary Route Plan available

15 Functional PWAS and RVCCCS

16 Ignition switch operational

17 Flagman Assigned

Operator Signature:

Safety Verification Signature:

Remarks:

Rev.01

In case of any deficiencies please contact your immediate supervisor and HSE Dept.

Operator Name: _________________ Operator Certification Expiry Date: _______________ Operator Signature: ________________

You might also like