You are on page 1of 16

INTERNATIONAL GENERAL

CERTIFICATE Assessor’s marking sheet


(2011 specification)

IGC3 – THE HEALTH AND


SAFETY PRACTICAL APPLICATION

Date of practical application 31/03/2016 Name of assessor

Course provider Course provider Safety Catch Safety Training & Consulting
822
number name Pvt.Ltd.

Student number 00329193 Student name Harikrishnan Edathittayil Sukumaran Nair

NEBOSH
Maximum
Assessor’s moderated
marks
Criteria available
marks awarded marks
(if different)

1 Completion of observation sheets

1.1 Range and outline of hazards and consequences 15

Identification of suitable control measures and


1.2 timescales
15

2 Report - Introduction and Executive Summary

Introduction providing an overview of the chosen


2.1 area
5

2.2 Executive summary 5

3 Report - Main findings of the inspection

3.1 Quality of interpretation of findings 15

Identification of possible breaches of international


3.2 standards
5

3.3 Persuasiveness / conciseness / technical content 10

4 Report - Conclusions and Recommendations

Clear and concise conclusions which are clearly


4.1 related to report findings and are effective in 15
convincing management to take action

Recommendations which present realistic actions to


4.2 improve health and safety in the chosen area
15

TOTAL MARKS 100


Outcome: PASS (60% or more) REFER (less than 60%)

Date assessed ____ / ____ / ____

Assessor’s signature ______________________

Date received by course provider ____ / ____ / ____

Date received by NEBOSH


(if applicable) _____ / _____ / _____

Assessor’s additional comments on the practical application:

ASSESSED BY (name in block letters) _________________________________________________

The mark sheet must be retained by the Course Provider and sent to NEBOSH only if requested.

NEBOSH USE ONLY

NEBOSH Moderator’s comments:


IGC3 – The Health and Safety Practical Application

Candidate and course provider declarations:

For completion by the candidate:

I declare that the work submitted for this practical application assessment ie. the completed observation sheets
and the report to management, is my own work. I recognise that contravention of this statement constitutes
malpractice and may result in my being subject to the penalties set out in the NEBOSH Malpractice policy.

Name (Print) HARIKRISHNAN E S

Signature _________________________________

Date _________________________________

For completion by a course provider representative (e.g. internal practical assessor):

I declare that the work marked is identical to that received from the candidate. I recognise that contravention of
this statement constitutes malpractice and may result in my being subject to the penalties set out in the NEBOSH
Malpractice policy.

Name (Print) _________________________________

Signature _________________________________

Date _________________________________

For completion by the course provider’s internal practical assessor:

I declare that I have marked this work and am both qualified and approved by NEBOSH to do so. I recognise
that contravention of this statement constitutes malpractice and may result in my being subject to the penalties
set out in the NEBOSH Malpractice policy.

Name (Print) _________________________________

Signature _________________________________

Date _________________________________

NB: This declaration must be completed in full submitted and retained with the
candidate’s script. If this declaration is not submitted the candidate’s result may be
declared void.
INTERNATIONAL GENERAL
CERTIFICATE Candidate’s observation
(2011 specification) sheet

IGC3 – THE HEALTH AND


SAFETY PRACTICAL APPLICATION
Sheet number 1 of__6__

Student name HARIKRISHNAN ES Student number 00329193

Place inspected STAR CONSTRUCTIONS Date of inspection 31 /03/2016

Observations Control measures Timescale


Hazards and consequences Immediate and longer term actions

1. Observed two workers were doing Stopped the job Immediate


the plastering of the outside of 6th floor
by standing on a temporary projected
scaffolding platform which was erected Repair or replace the working platform One week
from inside the building no guard rails and provide safety harness
and the boards are not secured.
Without wearing safety hrness.Which
may lads to falling of the people will Provide instruction, information and One month
cause serious injury or death. training.

2. There is a diesel leaking from the Switched off the generator Immediate
portable diesel generator near the site
store area, which may leads to fire and Provide dip tray for generator One day
explosion. It will cause to serious
injuries, fatality and damage of property. Provide periodical maintenance and One month
inspection for the generators.

3. Mobile crane (60 TON) outriggers Stop the lifting. Immediate


placed in an uneven surface while lifting
the concrete blokes near the cement Only competent persons are allowed to Two days
stacking area which can cause tumble operate the crane.
the crane. It leads to fatality and
property damage. Required training and instruction to all Two weeks
crane operators.

4. forklift operator exceed safe speed Take immediate action against the driver. Immediate
limit whist operating forklift truck (5
TON) near the site entrance which Give tool box talk, Daily
leads to collision with other equipment’s
and pedestrians, it may cause serious Provide awareness class, instruction and Two days
injury and damage to the property. training. Install speed limit signage
INTERNATIONAL GENERAL
CERTIFICATE Candidate’s observation
(2011 specification) sheet

IGC3 – THE HEALTH AND


SAFETY PRACTICAL APPLICATION
Sheet number 2 of _6__

Student name HARIKRISHNAN ES Student number 00329193

Place inspected STAR CONSTRUCTIONS Date of inspection 31/03/2016

Observations Control measures Timescale


Hazards and consequences Immediate and longer term actions

5. . First aid box placed in site office Appoint a first aider. Immediate
but no first aider or competent first aid
persons in the construction site. And the Proper inspection of the first aid box. One week
company didn’t carry out any health
surveillance measures in the work Conduct periodical health check-up like Two weeks
place. ear test eye test lungs test etc.

6. Found one labour doing over head Advised him to came down from the Immediate
painting at ground floor by standing on ladder
a portable ladder around 4 meter
height. The ladder was placed on an Provide proper scaffolding platform or Two weeks
uneven surface and not secured MEWP for working at height
anywhere. It may leads to the loosing
stability of the ladder worker fall from
height. It will cause serious injury or Instruction information and training One month
fatality. required.

7. Noticed two workers smoking near Clear the workers from site Immediate
the gas cylinder storage area which
leads to fire explosion and fatality Prohibition signage’s should be provided Two days

Provide designated smoking area One week

8. Observed that one worker was Stopped the job Immediate


grinding the steel bar with electrically
operated grinding machine in water Provide awareness and supervision. Two days
contaminated surface, which leads to
serious electric shock and electrocution. Adequate training required. One month
INTERNATIONAL GENERAL
CERTIFICATE Candidate’s observation
(2011 specification) sheet

IGC3 – THE HEALTH AND


SAFETY PRACTICAL APPLICATION
Sheet number 3 of __6___

Student name HARIKRISHNAN ES Student number 00329193

Place inspected STAR CONSTRUCTONS Date of inspection 31/03/2016

Observations Control measures Timescale


Hazards and consequences Immediate and longer term actions

9. Vehicles and pedestrians are Signaller must be appointed to guide the Immediate
moving closely to the excavation area , incoming people and vehicles.
there is no signaller and signage’s.
Excavated soil kept near the edge of Provide hard barriers one metre away One day
the excavation which can cause from the edge of the excavation.
workers as well as vehicles fall inside excavated soil should be clear from 1
the excavation and workers can entrap meters away from the edge of the
or crush due to the unsecured soil. excavation

Provide sufficient light and warning lamp Two weeks

10. Observed gas leak from acetylene Shut down regulator immediately. Immediate
cylinder hose connection in fabrication
area while cutting the steel pipe by Advise workers to conduct pre use One day
using oxy acetylene cutting torch. checks before starting work.
Which may leads to fire disaster.
Conduct training on the basis of “Safe One week
operating procedures of oxy acetylene
gas cylinders

11. Observed a group of labours Evacuated the workers from that area Immediate
working underneath suspended immediately.
scaffolding materials which was lifted by
the tower crane at a height of 15 meter Ensure that area to be identified with One day
this can cause falling of materials from proper signage and warning light.
height it leads to fatality and damage to
the property Provide banks man with high visible Two days
jacket.

12. Noticed that one photocopier Switch off the electrical supply Immediate
electrical cables were laying in the
walkway with damaged insulation also Ensure that all equipment’s which are Two weeks
electrical wires are in exposed condition using in the office should be tested and
in the site office, it leads to electrical inspected periodically.
shock and chances of catching fire
Provide cable laying trays or overhead One month
protection for cables
INTERNATIONAL GENERAL
CERTIFICATE Candidate’s observation
(2011 specification) sheet

IGC3 – THE HEALTH AND


SAFETY PRACTICAL APPLICATION
Sheet number 4 of __6_

Student name HARIKRISHNAN ES Student number 00329193

Place inspected STAR CONSTRUCTIONS Date of inspection 31/03/2016

Observations Control measures Timescale


Hazards and consequences Immediate and longer term actions

13. A carpenter cutting the piece of Stop the work Immediate


wood with bench mounted circular saw
in carpenter shop without wearing the Adequate instruction and appropriate Three days
dust mask and ear muff .Which leads to personal protective equipment should be
suffocation and pneumoconiosis .high use should be use
noise can cause tinnitus.
Vacuum cleaner and air purifier system Two days
can be use

14. One worker tried to lift the cement Stop the manual handling Immediate
packet (50)kg manually from cement
stacking area to cement mixing area, it Ensure pallet truck or fork truck to be use Five days
may leads to upper limb diseases and for transporting materials
back pain including musculosketal
disorder . Adequate training and supervision One month
should be provided

15. Three Scaffolders were erecting the Stop the staging erection
Immediate
scaffolding at height of 8 meter without
securing his safety harness snap hook Tool Box Talk to be provide regarding Daily
on the north side of building which can “working at height safety”
cause falling of person from height and
it is leads to serious injury and fatality Give awareness and training to all scaffolders. Three months
Only competent persons are allowed to erect
the scaffolding. Isolate the area

16. Observed that the lifting of two big Stopped the lifting. Immediate
pipes by mobile crane, found the lifting
belt damage. It may leads to Brocken Replace the belt with new one Two days
the belt and falling of the load. This can
cause to serious injuries, fatality and To be inspect all lifting gears One month
damage to property.
INTERNATIONAL GENERAL
CERTIFICATE Candidate’s observation
(2011 specification) sheet

IGC3 – THE HEALTH AND


SAFETY PRACTICAL APPLICATION
Sheet number 5 of _6

Student name HARIKRISHNAN ES Student number 00329193

Place inspected STAR CONSTRUCTIONS Date of inspection 31/03/2016

Observations Control measures Timescale


Hazards and consequences Immediate and longer term actions

17. Noticed that a welder was welding Stop the welding activity. Immediate
in new fabrication area with defective
welding holder and damaged welding Give Tool Box Talk regarding defective Daily
cable which may leads to electrical welding equipment’s.
shock and spark from defective welding
set can cause fire. Proper inspection required for all welding One month
equipment’s before start the work.

18. Observed four workers working Provide training and instructions Immediate
inside excavation (15 x 10 meter) Evacuate the workers
without protecting the side wall and the
sharp edges which can occur cave-in or Provide side wall protection like slopping One day
land sliding it leads to serious injury and shielding shoring.
fatality.
Issue permit to work system and Five days
competent supervision

19. Worker was drilling the old concrete Reduce the exposure time of vibration Immediate
block by using jack hammer without any
work preparation. It leads to Hand arm Provide appropriate PPE like gloves to One day
vibration syndrome and WRULD’s keep hand in a warm condition

Provide job rotations also equipment 1 month


should be maintained to avoid reduce
the vibration due to faults.

20. Observed a worker was rolling the Instruct him to stop the rolling Immediate
acetylene gas cylinder as part of job
preparation north side of fabrication
area. Rolling of cylinder cause valve Provide trolley to transport the cylinders. 2 days
damage and it may leads to explosion, Required supervision.
property damage and fatality.
Ensure that workers are trained for’ 3 months
handling of gas cylinders’
INTERNATIONAL GENERAL
CERTIFICATE Candidate’s observation
(2011 specification) sheet

IGC3 – THE HEALTH AND


SAFETY PRACTICAL APPLICATION
Sheet number 6 of _6__

Student name HARIKRISHNAN ES _ Student number 00329193

Place inspected STAR CONSTRUCTIONS Date of inspection 31/03/2016

Observations Control measures Timescale


Hazards and consequences Immediate and longer term actions

21. Welfare facilities such as washing Good practice Maintain the


toilets, canteen, rest rooms are well same
facilitated and maintained good hygiene Continuous monitoring required

22. Vehicles are parking in designated Keep the standard Continuous


place far away from the construction
area.

23. Fire extinguishers are placed in Good practice Continue the


designated locations and assembly same
point provided in safe area.
INTERNATIONAL GENERAL
CERTIFICATE
(2011 specification) Candidate report

UNIT IGC3 – THE HEALTH AND


SAFETY PRACTICAL APPLICAITON

Student number 00329193

Location STAR CONSTRUCTIONS Date 31/03/2016

Introduction including overview of area inspected and activities taking place

The report follows a health and safety inspection carried out by me at STAR
Constructions. The company has taken an additional contract of constructing three multi
storied buildings.

I visited the construction site at Kakkanad, Ernakulum district on 31 March 2016 at 11 am.
The construction site is for flat of 22 double bed rooms, flat of 23 bed room and 32 bed rooms.
It is a 9 store building construction with 2 lifts 2 emergency exit and two gates at front and
back side of each flat. There is one swimming pool and one gymnasium on each flat to
construct at south eastern side of the flats.

There are around 150 people working. The activities going on are
excavation, piling, scaffolding work, steel work, painting, concreting, piping, and carpentry
work etc. There are three mobile cranes and two tower cranes, three excavator, four dumping
truck and two forklifts are in operation. Also four cement mixing machine, two welding
machine and other portable equipments are using.
INTERNATIONAL GENERAL
CERTIFICATE
(2011 specification) Candidate report

UNIT IGC3 – THE HEALTH AND


SAFETY PRACTICAL APPLICAITON

Student number 00329193

Location STAR CONSTRUCTIONS Date 31/03/2016

Executive Summary

A thorough inspection was conducted all over the site and accommodations area. Major
hazards have been identified during the site inspection. It is clear that management take
necessary consideration for the areas like excavation, crane operation, electricity, Gas
cylinders and during my inspection I did not find any work related accident or serious injuries.

A safety survey, safety tour, safety audits and safety inspections will reveals the lack of
attention by the management in the area.

The company take immediate actions to consider the excavation safety, electrical safety,
crane operation safety, fire and explosion hazards and working at height safety.

Recommendations for improvement in necessary consideration area were less expensive


(around Rs 6,25,000) and it will reduce the rate of accidents. If the company take these less
expense as a consideration then they can avoid the loss high cost by major accidents occur.
Another important factor is that the company consider these areas a requirement and accept
the guidelines of ILO – OSHA and also accept the recommendations then the rate of accident
can reduce into zero. Then the good reputation and image of the company will go high and the
company will get more business.
INTERNATIONAL GENERAL
CERTIFICATE
(2011 specification) Candidate report

UNIT IGC3 – THE HEALTH AND


SAFETY PRACTICAL APPLICAITON

Student number 00329193

Location STAR CONSTRUCTIONS Date 31/03/2016

Main findings of the inspection

1. Electrical safety (Observation no:8, 12, 17 )

In my inspection observed welder using defective welding holder and damaged


welding cables. Also find hazardous arrangements in site office, one exposed electrical
cable which was used for photocopier laying in walkway. Electricity itself it is a hazard
which can cause electrocution, serious tissue burns, heart fibrillation, death. A small
electrical spark turns into major fire.

I recommended that defective welding set (power tool) must be replaced and
follow work permit system. All electrical equipment’s should be tested and certified
prior to use. All electrical cables are routed by ELCB. Periodical inspection should be
carried out for fixed and portable electrical equipment’s

Violation and breach of the Kerala electricity act 1904 and BOCW act 1996

The cost is around Rs 55000

2. Crane operations safety (Observation No: 3, 11, 16)

In my site inspection identified that one mobile crane outriggers placed in an un even
surface during the crane operations, also noticed few workers were walking under the
suspend scaffolding materials whilst lifting with tower crane. This shows the
management commitment towards the crane operations.

I recommended company should provide a competent crane operator, also


qualified rigger controller with proper communication system like radio, wireless
phone to be provided. Proper barricade, signage and warning alarm provided for lifting
materials. These incident can cause serious accident, company should follow safe
operating system and permit to work system

Breach of Indian factories act 1948 section 29

The cost is around Rs 60000


3. Handling and storage of flammable gas cylinders (Observation No:7, 10, 20)

In my inspection observed acetylene gas was leaking from the main connections, also find
one worker was rolling the acetylene cylinder. Few workers were smoking closely to the
acetylene cylinder storage area. These points are high risk it may leads to serious injury and
damage to the property.

Find exact locations of leak by using soap solution test and change the valve and coupling if
possible or tighten. Ensure that workers are trained for handling and usage of gas cylinders
and ensure that gas cylinders storing in a safe location with proper signage and fencing.

Violation and breach of Kerala explosive substance act 1908


The cost is around Rs 1, 00,000

4. Excavation safety(Observation No:9, 18)

There are two excavation (20 X 10 meters) carried out near the pedestrian and vehicles moving
area. The chance of fall of personnel as well as vehicle is very high. If they follow the same
condition, there could be a major accident and it can cause serious injury and damage to
vehicles. Lack of trench protection increase the risk of cave-in which leads to trapping and
crushing of persons.

I recommended that immediate hard fencing and signage should be provided and side wall
protection like sloping, benching, shielding to be provided, Also company should follow
permit to work system. Excavated soil should be 1 meters away from the edge of the
excavation.
It is the breach of breach of BOCW act section 20.81 and 20.85.
The cost will be around Rs 2, 50,000

5. Working at height safety (Observation No: 1, 6, 15)

In my inspections observed that in different locations employees working at height


without any safety measures. People working on unsafe, unsecured platform without wearing
safety harness at the outside of 6 th floor and unsafe use of portable ladder and also unsafe
scaffolding erection.It may leads to serious accidents like people falling from height or
materials falling from height. It can cause serious injuries and fatalities.

I recommended that to conduct adequate training programs to all employees


regarding working at height safety. Provide proper PPE like safety harness to all employees
who ever Woking at height and provide safety catch nets underneath of such platforms.
Appoint a competent person for proper inspections.
It is the breach of BOCW ACT 1996 and work at height regulation 2005 regulation 5 and 6(5)(b)

The cost is around Rs 1,00,000


INTERNATIONAL GENERAL
CERTIFICATE
(2011 specification) Candidate report

UNIT IGC3 – THE HEALTH AND


SAFETY PRACTICAL APPLICAITON

Student number 00329193

Location STAR CONSTRUCTIONS Date 31/03/2016

Conclusions

Over all the workplace was clean and well maintained in good working
condition. The main findings of the workplace were regarding unsafe excavation practice,
Electrical safety, unsafe crane operations, handling and storage of flammable gas cylinders,
and finally working at height. Inspections, commitment of the management, Instruction,
Information and training which plays an important role for correcting all the findings. So it is
necessary to focus on certain parts like,

 Providing proper inspection and supervision of the excavation areas.


 Giving adequate training to the crane operators, banksmans, those who are handling
or working with flammable gas cylinders and working with electricity.
 Appointment of competent person for performing the each and every task.
 Conducting more awareness programmes on health and safety culture.

The recommended actions require some few lakhs of rupees which is hardly a minute cost
compared to cost lost of a major accident. Implementation of the recommendations improves
the workers moral which will result in a better production with healthy environment. Also it will
helps to avoid the leagel enforcement actions against the company.
INTERNATIONAL GENERAL
CERTIFICATE
(2011 specification) Candidate report

UNIT IGC3 – THE HEALTH AND


SAFETY PRACTICAL APPLICAITON

Student number 00329193

Location STAR CONSTRUCTIONS Date 31/03/2016

Recommendations:

Recommendation Likely resource implications Priority Target date

Repairing of damaged
electrical equipments The estimated cost is
and replacement of Rs.55000 High On month
damaged cables and
conducting training
programs

Appointment of new
competent crane
operators and The estimated cost is Rs
replacement of 1,50000 High Two month
damaged lifting
equipments.
Repairing and
replacement of
damaged cylinder
valves and providing The estimated cost is Rs High One month
good storage area for 80000
cylinders with proper
fencing and lock

Providing of excavation The estimated cost is around High One week


protections like shoring Rs 2,50,000
and trench boxes and
also hard fencing and
signage’s around the
excavation areas.

Providing of safety The estimated cost is around High One week


catch nets and safety Rs 90000
harness