Professional Documents
Culture Documents
Course provider Course provider Safety Catch Safety Training & Consulting
822
number name Pvt.Ltd.
NEBOSH
Maximum
Assessor’s moderated
marks
Criteria available
marks awarded marks
(if different)
The mark sheet must be retained by the Course Provider and sent to NEBOSH only if requested.
I declare that the work submitted for this practical application assessment ie. the completed observation sheets
and the report to management, is my own work. I recognise that contravention of this statement constitutes
malpractice and may result in my being subject to the penalties set out in the NEBOSH Malpractice policy.
Signature _________________________________
Date _________________________________
I declare that the work marked is identical to that received from the candidate. I recognise that contravention of
this statement constitutes malpractice and may result in my being subject to the penalties set out in the NEBOSH
Malpractice policy.
Signature _________________________________
Date _________________________________
I declare that I have marked this work and am both qualified and approved by NEBOSH to do so. I recognise
that contravention of this statement constitutes malpractice and may result in my being subject to the penalties
set out in the NEBOSH Malpractice policy.
Signature _________________________________
Date _________________________________
NB: This declaration must be completed in full submitted and retained with the
candidate’s script. If this declaration is not submitted the candidate’s result may be
declared void.
INTERNATIONAL GENERAL
CERTIFICATE Candidate’s observation
(2011 specification) sheet
2. There is a diesel leaking from the Switched off the generator Immediate
portable diesel generator near the site
store area, which may leads to fire and Provide dip tray for generator One day
explosion. It will cause to serious
injuries, fatality and damage of property. Provide periodical maintenance and One month
inspection for the generators.
4. forklift operator exceed safe speed Take immediate action against the driver. Immediate
limit whist operating forklift truck (5
TON) near the site entrance which Give tool box talk, Daily
leads to collision with other equipment’s
and pedestrians, it may cause serious Provide awareness class, instruction and Two days
injury and damage to the property. training. Install speed limit signage
INTERNATIONAL GENERAL
CERTIFICATE Candidate’s observation
(2011 specification) sheet
5. . First aid box placed in site office Appoint a first aider. Immediate
but no first aider or competent first aid
persons in the construction site. And the Proper inspection of the first aid box. One week
company didn’t carry out any health
surveillance measures in the work Conduct periodical health check-up like Two weeks
place. ear test eye test lungs test etc.
6. Found one labour doing over head Advised him to came down from the Immediate
painting at ground floor by standing on ladder
a portable ladder around 4 meter
height. The ladder was placed on an Provide proper scaffolding platform or Two weeks
uneven surface and not secured MEWP for working at height
anywhere. It may leads to the loosing
stability of the ladder worker fall from
height. It will cause serious injury or Instruction information and training One month
fatality. required.
7. Noticed two workers smoking near Clear the workers from site Immediate
the gas cylinder storage area which
leads to fire explosion and fatality Prohibition signage’s should be provided Two days
9. Vehicles and pedestrians are Signaller must be appointed to guide the Immediate
moving closely to the excavation area , incoming people and vehicles.
there is no signaller and signage’s.
Excavated soil kept near the edge of Provide hard barriers one metre away One day
the excavation which can cause from the edge of the excavation.
workers as well as vehicles fall inside excavated soil should be clear from 1
the excavation and workers can entrap meters away from the edge of the
or crush due to the unsecured soil. excavation
10. Observed gas leak from acetylene Shut down regulator immediately. Immediate
cylinder hose connection in fabrication
area while cutting the steel pipe by Advise workers to conduct pre use One day
using oxy acetylene cutting torch. checks before starting work.
Which may leads to fire disaster.
Conduct training on the basis of “Safe One week
operating procedures of oxy acetylene
gas cylinders
11. Observed a group of labours Evacuated the workers from that area Immediate
working underneath suspended immediately.
scaffolding materials which was lifted by
the tower crane at a height of 15 meter Ensure that area to be identified with One day
this can cause falling of materials from proper signage and warning light.
height it leads to fatality and damage to
the property Provide banks man with high visible Two days
jacket.
12. Noticed that one photocopier Switch off the electrical supply Immediate
electrical cables were laying in the
walkway with damaged insulation also Ensure that all equipment’s which are Two weeks
electrical wires are in exposed condition using in the office should be tested and
in the site office, it leads to electrical inspected periodically.
shock and chances of catching fire
Provide cable laying trays or overhead One month
protection for cables
INTERNATIONAL GENERAL
CERTIFICATE Candidate’s observation
(2011 specification) sheet
14. One worker tried to lift the cement Stop the manual handling Immediate
packet (50)kg manually from cement
stacking area to cement mixing area, it Ensure pallet truck or fork truck to be use Five days
may leads to upper limb diseases and for transporting materials
back pain including musculosketal
disorder . Adequate training and supervision One month
should be provided
15. Three Scaffolders were erecting the Stop the staging erection
Immediate
scaffolding at height of 8 meter without
securing his safety harness snap hook Tool Box Talk to be provide regarding Daily
on the north side of building which can “working at height safety”
cause falling of person from height and
it is leads to serious injury and fatality Give awareness and training to all scaffolders. Three months
Only competent persons are allowed to erect
the scaffolding. Isolate the area
16. Observed that the lifting of two big Stopped the lifting. Immediate
pipes by mobile crane, found the lifting
belt damage. It may leads to Brocken Replace the belt with new one Two days
the belt and falling of the load. This can
cause to serious injuries, fatality and To be inspect all lifting gears One month
damage to property.
INTERNATIONAL GENERAL
CERTIFICATE Candidate’s observation
(2011 specification) sheet
17. Noticed that a welder was welding Stop the welding activity. Immediate
in new fabrication area with defective
welding holder and damaged welding Give Tool Box Talk regarding defective Daily
cable which may leads to electrical welding equipment’s.
shock and spark from defective welding
set can cause fire. Proper inspection required for all welding One month
equipment’s before start the work.
18. Observed four workers working Provide training and instructions Immediate
inside excavation (15 x 10 meter) Evacuate the workers
without protecting the side wall and the
sharp edges which can occur cave-in or Provide side wall protection like slopping One day
land sliding it leads to serious injury and shielding shoring.
fatality.
Issue permit to work system and Five days
competent supervision
19. Worker was drilling the old concrete Reduce the exposure time of vibration Immediate
block by using jack hammer without any
work preparation. It leads to Hand arm Provide appropriate PPE like gloves to One day
vibration syndrome and WRULD’s keep hand in a warm condition
20. Observed a worker was rolling the Instruct him to stop the rolling Immediate
acetylene gas cylinder as part of job
preparation north side of fabrication
area. Rolling of cylinder cause valve Provide trolley to transport the cylinders. 2 days
damage and it may leads to explosion, Required supervision.
property damage and fatality.
Ensure that workers are trained for’ 3 months
handling of gas cylinders’
INTERNATIONAL GENERAL
CERTIFICATE Candidate’s observation
(2011 specification) sheet
The report follows a health and safety inspection carried out by me at STAR
Constructions. The company has taken an additional contract of constructing three multi
storied buildings.
I visited the construction site at Kakkanad, Ernakulum district on 31 March 2016 at 11 am.
The construction site is for flat of 22 double bed rooms, flat of 23 bed room and 32 bed rooms.
It is a 9 store building construction with 2 lifts 2 emergency exit and two gates at front and
back side of each flat. There is one swimming pool and one gymnasium on each flat to
construct at south eastern side of the flats.
There are around 150 people working. The activities going on are
excavation, piling, scaffolding work, steel work, painting, concreting, piping, and carpentry
work etc. There are three mobile cranes and two tower cranes, three excavator, four dumping
truck and two forklifts are in operation. Also four cement mixing machine, two welding
machine and other portable equipments are using.
INTERNATIONAL GENERAL
CERTIFICATE
(2011 specification) Candidate report
Executive Summary
A thorough inspection was conducted all over the site and accommodations area. Major
hazards have been identified during the site inspection. It is clear that management take
necessary consideration for the areas like excavation, crane operation, electricity, Gas
cylinders and during my inspection I did not find any work related accident or serious injuries.
A safety survey, safety tour, safety audits and safety inspections will reveals the lack of
attention by the management in the area.
The company take immediate actions to consider the excavation safety, electrical safety,
crane operation safety, fire and explosion hazards and working at height safety.
I recommended that defective welding set (power tool) must be replaced and
follow work permit system. All electrical equipment’s should be tested and certified
prior to use. All electrical cables are routed by ELCB. Periodical inspection should be
carried out for fixed and portable electrical equipment’s
Violation and breach of the Kerala electricity act 1904 and BOCW act 1996
In my site inspection identified that one mobile crane outriggers placed in an un even
surface during the crane operations, also noticed few workers were walking under the
suspend scaffolding materials whilst lifting with tower crane. This shows the
management commitment towards the crane operations.
In my inspection observed acetylene gas was leaking from the main connections, also find
one worker was rolling the acetylene cylinder. Few workers were smoking closely to the
acetylene cylinder storage area. These points are high risk it may leads to serious injury and
damage to the property.
Find exact locations of leak by using soap solution test and change the valve and coupling if
possible or tighten. Ensure that workers are trained for handling and usage of gas cylinders
and ensure that gas cylinders storing in a safe location with proper signage and fencing.
There are two excavation (20 X 10 meters) carried out near the pedestrian and vehicles moving
area. The chance of fall of personnel as well as vehicle is very high. If they follow the same
condition, there could be a major accident and it can cause serious injury and damage to
vehicles. Lack of trench protection increase the risk of cave-in which leads to trapping and
crushing of persons.
I recommended that immediate hard fencing and signage should be provided and side wall
protection like sloping, benching, shielding to be provided, Also company should follow
permit to work system. Excavated soil should be 1 meters away from the edge of the
excavation.
It is the breach of breach of BOCW act section 20.81 and 20.85.
The cost will be around Rs 2, 50,000
Conclusions
Over all the workplace was clean and well maintained in good working
condition. The main findings of the workplace were regarding unsafe excavation practice,
Electrical safety, unsafe crane operations, handling and storage of flammable gas cylinders,
and finally working at height. Inspections, commitment of the management, Instruction,
Information and training which plays an important role for correcting all the findings. So it is
necessary to focus on certain parts like,
The recommended actions require some few lakhs of rupees which is hardly a minute cost
compared to cost lost of a major accident. Implementation of the recommendations improves
the workers moral which will result in a better production with healthy environment. Also it will
helps to avoid the leagel enforcement actions against the company.
INTERNATIONAL GENERAL
CERTIFICATE
(2011 specification) Candidate report
Recommendations:
Repairing of damaged
electrical equipments The estimated cost is
and replacement of Rs.55000 High On month
damaged cables and
conducting training
programs
Appointment of new
competent crane
operators and The estimated cost is Rs
replacement of 1,50000 High Two month
damaged lifting
equipments.
Repairing and
replacement of
damaged cylinder
valves and providing The estimated cost is Rs High One month
good storage area for 80000
cylinders with proper
fencing and lock