You are on page 1of 1

HAWIYAH GAS PLANT EXPANSION PROJECT

MONTHLY WHEEL LOADER INSPECTION

Date of Inspection: __________________________________ Company Name: _____________________


Manufacturer: _______________________________ Operator Name: ________________________________
Equipment Number: __________________________ Aramco ID #: _________________________________
Model: _____________________________________ Aramco ID Expiry:______________________________
Equip. Insurance Expiry: _______________________ Equip. 3rd Party Expiry: __________________________

INSPECTOR TO COMPLETE THIS SECTION TICK THE APPROPRIATE BOX Yes No N/A
1 Valid Equipment Third Party Certificate
2 No Fuel, Hydraulic, Engine, Transmission fluid & Engine Coolant leakage
3 Functional Steering system
4 Levers/Control Operational
5 No abnormal sounds noted in the equipment
6 No rust, corrosion or damage on the Diesel and Hydraulic Oil Tanks
7 Battery is firmly secured, terminals and cables in good condition
8 No excessive wear & leaks on Cylinders, Hoses and Connections
9 Bucket Pivots, Connections and Safety Pins are in good condition
10 Tracks complete and Track assembly is in good condition
11 Bucket Tilt Cylinders is functional
12 Bucket Ripper & Ripper Shank is clean and not damaged
13 Functional brake system
14 Functional Accelerator Control Panel
15 Steps and handholds are firm and stable
16 Windshield Wipers in good condition
17 Clean overall interior
18 Cab is equipped with functional heater, defroster ad wiper
19 Functional Air conditioner fitted in Operator cabin
20 Operator Seat belt is tight, no damage and functional
21 Functional Horn, back up alarm and lights (front & Tail)
22 No Damage, Loose Bolts or Clearance observed
23 Mirrors (side and rear mirrors) are not broken/Cracked/Loose
24 Serviced and inspected fire extinguisher is in the truck
25 Fire Extinguisher is UL Listed
26 Operator with valid SAG Driving License
27 Operator with Saudi Aramco Certificate verified?
28 Beacon/Flashing Amber light fitted to the Equipment
29 Exhaust is fitted with Spark arrestor
30 PWAS (LCD Monitor is clear, detection within 6m is functional, audible sound
during detection of sensor) and RVCCCS are fitted to the equipment?
31 Operator Drinking water igloo available?
32 Functional Ignition Switch

Remarks: _________________________________________________________________________________

Inspector’s Name (HSE): __ ______________ Signature: ___________________________

Inspector’s Name (MTCE): __ _____________ Signature: ____________________________

Rev.02

You might also like