You are on page 1of 1

Report No:

INSTALLATION OF RADIATION PYROMETER


CHECK LIST Date:

Customer : Project: Project Code:


Sub- Contractor : WO No & Amndt, If any.:
Manufacturer : PO No & Amndt, If any.:
Item Description: Identification No.
Location: Sub Location:
Package: Drg No & Rev No :
FQP No. & Rev No. RFIC No.

Total Inspected & Total Inspected &


Total offered Quantity:
Accepted Quantity: Rejected Quantity:

Checked
Sl No Description of Check Points Remarks
Yes No NA

1 Approved Location drawing is available Drg No :

2 Approved P & ID is available Drg No :

3 Approved Typical drawing is available Drg No :

4 Make & type of radiation pyrometer is approved by client

5 Sub Contractor is pre qualified and approved

6 Method Statement is approved by client

7 Ensure valid calibartion of Pyrometer

8 Ensure the Location is verified as per Location Drawing

9 Ensure the radiation pyrometer is free from damages / defects

Ensure Supplied radiation pyrometer specifications match with approved


10
Data Sheet

11 Ensure Tag plate is correct as per approved Drawing

Ensure Pyrometer stand / stanchion is installed on the ground / platform as


12
per typical drawing

13 Ensure the grouting is done in between the base plate and ground

Ensure the mounting bracket is installed and sensor height is as per


14
drawing & oreintation is toward the hot object.

Ensure radiation pyrometer display orientation is accessible for termination


15
purpose and visible to operator.

16 Ensure the Pyrometer canopy is installed

Remarks:

Signature of Sub - Contractor & Date Signature of TPL-FQE & Date Signature of Customer / Inspection Authority & Date
Format No.08-03-05-FMT-I-FMI-CL-007-R00