You are on page 1of 1

PROVISION OF ENGINEERING, PROCUREMENT, CONSTRUCTION

AND COMMISSIONING (EPCC) OF WATER MANAGEMENT SYSTEM


(PHASE 1) FOR PETRONAS CARIGALI IRAQ HOLDING B.V.’S GARRAF
OPERATION

ELEVATION SURVEY REPORT


Contract No. : PCIHBV/2014/P&E/352

Area / Department: Third River water Intake area Report No Drawing : GF-WMS1-CS-25-5015

Specific Location : Water Intake Pool Control point No. : BM0-Msk


Date of Inspection : Control point elevation 100.33
Subject : Toc for stairs

Back Height of Design


Foresight Elevation Different
No. Survey point sight Instrument Elevation Remark
(BS) (HI) (FS) (mm) (mm) (mm)
1 TOC 4.5 104.83 12.170 92.661 92.660 0.001
2 TOC 3.2 103.53 8.250 95.279 95.280 -0.001
3 TOC 2.15 102.48 4.580 97.901 97.900 0.001

Sub contractor (MSK) Surveyor : Contractor (CPP) Engineer : PCIHBV Representative:

Signature : Signature : Signature :

Name : Name : Name :

Date : Date : Date :

You might also like