To

Siemens Pte Ltd

FAO:
Siemens DC 1

Transmittal : MR3-MISC-SIEM-08907
Issue date: 03-08-2022
Originator: Hiew Kok Yin

Remarks: SSBO_RETURN COMMENTS


Documentation:

Document Rev Title

Doc.
status

No. of
copies

Media
size

Issue
code

Due before

MR3-SSBO-PRO-PID-2080XM-31011 00 S60 & S70 PID SGTA35 LUBE & HYDRAULIC


OIL SYSTEM - GTG

AFC 1 2 17-08-2022

Ad-hoc / reference:

Document Title

No. of
copies

Media
size

Issue
code
TRX_COMMENT_MR3-MISC-SIEM-08907_89364 Comment document belonging to
MR3-MISC-SIEM-08907_89364 2
Legend:
Issue
code Description
2 Approved with Comments – Refer to CRS for Next Revision
Status
Doc.
status Description
AFC Approved for Construction

Condition THE DOCUMENTS ARE DUE TO BE RETURNED BEFORE THE NOTED DUE DATES.

External Transmittal
MISC Berhad

If applicable, please resubmit documents before due date


Please sign a copy of this transmittal and return by mail as acknowledgement of
receipt
Raised by: Neena Binti Johari Received date:
Document Controller Received by:
MISC Berhad Page 1 of 1

To
Siemens Pte Ltd

FAO:
Siemens DC 1

Transmittal : MR3-MISC-SIEM-08906
Issue date: 03-08-2022
Originator: Hiew Kok Yin

Remarks: SSBO_RETURN COMMENTS


Documentation:

Document Rev Title

Doc.
status

No. of
copies

Media
size

Issue
code

Due before

MR3-SSBO-PRO-PID-2080XM-31002 00 S60 & S70 PID GAS FUEL NON DLE SYSTEM
- GTG

AFC 1 2 17-08-2022

Ad-hoc / reference:
Document Title

No. of
copies

Media
size

Issue
code
TRX_COMMENT_MR3-MISC-SIEM-08906_89355 Comment document belonging to
MR3-MISC-SIEM-08906_89355 2
Legend:
Issue
code Description
2 Approved with Comments – Refer to CRS for Next Revision
Status

Doc.
status Description
AFC Approved for Construction

Condition THE DOCUMENTS ARE DUE TO BE RETURNED BEFORE THE NOTED DUE DATES.

External Transmittal
MISC Berhad

If applicable, please resubmit documents before due date


Please sign a copy of this transmittal and return by mail as acknowledgement of
receipt
Raised by: Neena Binti Johari Received date:
Document Controller Received by:
MISC Berhad Page 1 of 1

To
Siemens Pte Ltd

FAO:
Siemens DC 1

Transmittal : MR3-MISC-SIEM-08914
Issue date: 03-08-2022
Originator: Hiew Kok Yin

Remarks: SSBO_RETURN COMMENTS


Documentation:

Document Rev Title

Doc.
status

No. of
copies

Media
size

Issue
code

Due before

MR3-SSBO-INS-TDS-2080XM-31002 F0 S60 & S70 DATASHEET GAS


CHROMATOGRAPH VALVE DBB - GTG

IFF 1 1

Legend:
Issue
code Description
1 Approved - Revise to the Next (Suitable) Revision status

Doc.
status Description
IFF Issued as Final

Condition THE DOCUMENTS ARE DUE TO BE RETURNED BEFORE THE NOTED DUE DATES.

External Transmittal
MISC Berhad

If applicable, please resubmit documents before due date


Please sign a copy of this transmittal and return by mail as acknowledgement of
receipt
Raised by: Neena Binti Johari Received date:
Document Controller Received by:
MISC Berhad Page 1 of 1

To
Siemens Pte Ltd

FAO:
Siemens DC 1

Transmittal : MR3-MISC-SIEM-08952
Issue date: 04-08-2022
Originator: Hiew Kok Yin

Remarks: SSBO_RETURN COMMENTS


Documentation:
Document Rev Title

Doc.
status

No. of
copies

Media
size

Issue
code

Due before

MR3-SSBO-MEC-TDS-2080XM-31007 F0 S60 & S70 CALCULATIONS ANTI VIBRATION


MOUNTS - GTG

IFF 1 1

Legend:
Issue
code Description
1 Approved - Revise to the Next (Suitable) Revision status

Doc.
status Description
IFF Issued as Final

Condition THE DOCUMENTS ARE DUE TO BE RETURNED BEFORE THE NOTED DUE DATES.

INSERT VENDOR LOGO HERE

T R A N S M I T T A L - D O C U M E N T

Project
Name TR No
Package Date

PO Number Response By Date


Attention
To:
S/N DOCUMENT NO DOCUMENT TITLE REV NO. VERSION

NO. ISSUE PURPOSE REMARKS


1 MR3-SSBO-MEC-DWG-2080XM-31023 S60 & S70 GA FUEL GAS COALESCER - GTG F0 1
AS-BUILT (ASB)

FPSO MARECHAL DUQUE DE CAXIAS (MERO 3 PROJECT) TR-20205-SBO-MOD-1062

MODULES S60 & S70 - TURBO GENERATORS 5-Aug-22

4500013015 19-Aug-22
Date 5-Aug-22 Date

kalyani.awate@siemens-energy.com

LEGEND:
IFR = Issued for Review, IFI = Issued for Information, AFD = Approved for
Design, IFC = Issued for Construction, AFC = Approved for Construction, IFF =
Issued Final Issue,
CAN = Cancelled/Superseded

Prepared By Panchashila Awad Received by

INSERT VENDOR LOGO HERE

T R A N S M I T T A L - D O C U M E N T

Project
Name TR No
Package Date

PO Number Response By Date


Attention
To:
S/N DOCUMENT NO DOCUMENT TITLE REV NO. VERSION

NO. ISSUE PURPOSE REMARKS


1 MR3-SSBO-INS-DWG-2080XM-31005 S60 & S70 GA SERVER PANEL - GTG 00 1

APPROVED FOR
CONSTRUCTION
(AFC)

2 MR3-SSBO-INS-LOP-2080XM-31003 S60 & S70 CIRCUIT & TERMINATION DIAGRAM SERVER

PANEL - GTG 00 1

APPROVED FOR
CONSTRUCTION
(AFC)

3 MR3-SSBO-MEC-PRC-2080XM-31000 S60 & S70 INSTALLATION AND RECEIPT PROCEDURE -

GTG F0 1

ISSUED AS FINAL
(IFF)

FPSO MARECHAL DUQUE DE CAXIAS (MERO 3 PROJECT) TR-20205-SBO-MOD-1063

MODULES S60 & S70 - TURBO GENERATORS 5-Aug-22

4500013015 19-Aug-22

Date 5-Aug-22 Date


kalyani.awate@siemens-energy.com

LEGEND:
IFR = Issued for Review, IFI = Issued for Information, AFD = Approved for
Design, IFC = Issued for Construction, AFC = Approved for Construction, IFF =
Issued Final Issue,
CAN = Cancelled/Superseded

Prepared By Panchashila Awad Received by

External Transmittal
MISC Berhad

If applicable, please resubmit documents before due date


Please sign a copy of this transmittal and return by mail as acknowledgement of
receipt
Raised by: Neena Binti Johari Received date:
Document Controller Received by:
MISC Berhad Page 1 of 1

To
Siemens Pte Ltd

FAO:
Siemens DC 1

Transmittal : MR3-MISC-SIEM-08977
Issue date: 05-08-2022
Originator: Hiew Kok Yin

Remarks: SSBO_RETURN COMMENTS


Documentation:

Document Rev Title

Doc.
status

No. of
copies

Media
size

Issue
code

Due before

MR3-SSBO-MEC-LST-2080XM-31002 F0 S60 S70 SPECIAL TOOL LIST - GTG IFF 1 1


Legend:
Issue
code Description
1 Approved - Revise to the Next (Suitable) Revision status

Doc.
status Description
IFF Issued as Final

Condition THE DOCUMENTS ARE DUE TO BE RETURNED BEFORE THE NOTED DUE DATES.

External Transmittal
MISC Berhad

If applicable, please resubmit documents before due date


Please sign a copy of this transmittal and return by mail as acknowledgement of
receipt
Raised by: Neena Binti Johari Received date:
Document Controller Received by:
MISC Berhad Page 1 of 1

To
Siemens Pte Ltd

FAO:
Siemens DC 1

Transmittal : MR3-MISC-SIEM-08860
Issue date: 02-08-2022
Originator: Hiew Kok Yin