STAMPING PAGE - REDLINES & BLUELINES

(1) CONTRACTOR STAMPS

REDLINE DRAWING
NAME: Solongo Tsogbadrakh

POSITION : E&I field engineer


REV: 1R2 DATE: 20/08/2023
PACKAGE NO: C-004D
Digitally signed by Solongo
Solongo Tsogbadrakh
DN: cn=Solongo Tsogbadrakh,
SIGNATURE: c=MN, o=MCSI, ou=Engineering
Tsogbadrakh team, email=solongo.ts@mcsi.mn
Date: 2023.08.20 18:41:00 +08'00'

CHANGED: AS DESIGNED:
PACKAGE SCOPE COMPLETED:
SUBSYSTEM ID: 1883-102-03

REV. 1R2 REV. REV. REV. REV. REV. REV. REV.


(2) EMPC STAMPS - (FE/CONST.)

RED-LINE
CONSTRUCTION
Date: Rev:
Print name: Tumenbayar Digitally signed by Tumenbayar 1
Purev
DN: cn=Tumenbayar Purev, ou=
Users, email=Tumenbayar.Purev
Signature: Purev @Worley.com
Date: 2023.09.02 20:52:45 +08'00'

FIELD ENGINEER Date:


Print name: Tengis Digitally signed by Tengis
Ganbold
DN: cn=Tengis Ganbold, ou=
Users, email=Tengis.Ganbold@
Signature: Ganbold worley.com
Date: 2023.09.04 16:22:01 +08'00'

2
PACKAGE: C- 004D
CONTRACTOR: MCSP
CHANGE NO CHANGE
CONSTRUCTION COMPLETION

REV. REV. REV. REV. REV. REV. REV. REV.


(3) COMMISSIONING (STAMPS)

NOTE 1: START ADDING STAMPS - FROM LEFT TO RIGTH


NOTE 2: IN THE CASE THAT MORE SPACES FOR STAMPS ARE NEEDED, ADD AN ADDITIONAL STAMPING PAGE TO THE PDF
OT DOC. NUMBER 1883-65-E2-1201
NOTE 3: STAMPING PAGE MUST BE FIRST PAGE OF THE DOCUMENT
NOTE 4: OT. DOC NUMBER MUST BE THE SAME NUMBER THAN THE DOCUMENT TO BE REDLINED (MANDATORY)
NOTE 5: FIELD ENGINEERING TEAM TO DEFINE REVISIONS ON EACH ON EACH BLOCK - SECTION (2) FORM: 0000-01-FRM-1112_0
FROM: 1883-ESS-2001-ITF CONTRACTOR MCSP
See refer drawing 1883-65-E2-1111_0

1883PDP2021-P01

DETAIL 1

ERDENETULGA. N
Erdenetulga Digitally signed by Erdenetulga Nayanbaatar
DN: cn=Erdenetulga Nayanbaatar, c=US,
email=Erdenetulga.Nayanbaatar@worleyparsons.com
Nayanbaatar Date: 2020.05.29 16:16:39 +08'00'

1R1 29/05/2020
003B
MCSP
X

Cable pulled and Cable pulled and


bagging tagged. bagging tagged.

Ichinnorov B.
Ichinnorov B.
1R1 2020 MAY 06
C-003B
Cable pulled
Bagging tagged.
and
bagging tagged.

1R1

NOTES
CONTRACTOR MCSI
1.- REFER TO STANDAR SPECIFICATION
1R2 CONTRACTOR MCSI No. 0000-65-SPE-0012 FOR PANEL DESIGN.
FENCED SECTION IS INSTALLED.
1R2
2.- MCCB-00 MAIN BREAKER: TMAX T4 (3P) MOLDED
FENCED SECTION IS INSTALLED.
CASE CIRCUIT BREAKER ABB MODEL.
1R2 3.- FOR CONNECTIONS DETAILS, SEE HIGH CAPITAL
FENCED SECTION IS INSTALLED. INDUSTRY INFORMATION PACKAGE CW2100356.
CONTRACTOR MCSI 4.- FOR CONNECTION OF THE 3 POLES MOLDED CASE
CIRCUIT
BREAKER, SEE DETAILS 1. THE CIRCUIT BREAKER
POLES
WILL BE WIRED IN SERIES.
5.- FOR CONNNECTIONS DETAILS SEE IT ZONE LCC
DOCUMENTS No 1853-75-10M-8301.
6.- FOR CABLE TAG SEE DRAWING No. 1883-65-E2-1102.
1883-65-E2-1111
7.- FOR MORE DETAILS OF POWER DISTRIBUTION PANEL,
SEE ABB INFORMATION PACKAGE CW2107362. (FOR
CIRCUIT BREAKER DESIGNATION IN ABB DRAWING
CONSIDER THE FOLLOWING : MCB & MCCB = Q).
8.- FOR CONNECTIONS DETAILS, SEE FIRE SYSTEM
ENGINIEERING INFORMATION PACKAGE CW2108795.,
DRAWING No: 1883-65-L5-1102 AND 1883-65-L5-1103.
9.- FOR CONNECTIONS DETAILS SEE, UYAN BEST LLC
DESIGN ISSUE
INFORMATION PACKAGE CW2115984.
JACOBS ENGINEERING SINGAPORE PTE LTD
- (Registration number 199803266M),
a company incorporated in Singapore and
having its registered office at 50 Raffles
Place #32-01 Singapore Land Tower,

CAUTION - PROJECT DRAWING - NOT AS BUILT Jacobs Document No.


SN1809-1883/IA.SLD/1107
Singapore, 048623 (the offshore Contractor)

Web: www.jacobs.com

Disclaimer: Drawings, plans, models, designs or any other information displayed, contained in, made available or disclosed in or by this
document (or its part or attachment) is owned by Oyu Tolgoi LLC and may be a proprietary of Oyu Tolgoi LLC and hence they are for the
internal use of Oyu Tolgoi LLC only. Making a copy or reproduction thereof in any form or giving an access or possession of them to any other
party without Oyu Tolgoi LLC's written consent or permission shall be strictly prohibited. Any violation (actual or attempted) of these terms