You are on page 1of 1

Document Submittal Form

Nakheel Mall East Wing Issue


Project Name (Level 1 & 2)
Project Number UPR377 24th Jan 2024
Date

Emkay Global Electrical Company ISG Middle East


From Company & Mechanical Works To
LLC Attention Tim Doherty

Shop Drawings (S) Material (M) Documents (D)

O&M Manual (OM) As Built (AB) Handover Documents (HD)

Doc. Discipl Comp. Serial Rev.


Level 1&2 Issued For A Approved
Type ine Initial No. No. B Approved /
Submittal 1 Info
noted
Number All 2 Approval
S MEP ISG 002A 00 Area C Re-submit
areas 3 Coordination
D Rejected

Drawing Number or Issue


Descriptions Rev.
For A B C D
Material Code

UPR-377-ISG-DR-ME-AC-LO1-D01 Level2 Demolition HVAC Layout Sheet 1 00 2

Consultant Comments:

Submitted By
ISG Project Manager Date
ISG Document Control Date

Approved By Tick
Client / Project Manager Company
Architect Name
MEP Consultant Signature Date

LA - Local Authority
AR - Architecture EE - Electrical
Discipline ME- Mechanical
AV - Audio Visual ID - Interior Design WS - Wet Services / Plumbing
Code: CW- Civil Works LS - Landscape
ST - Structural

AB - As Built Drawing
OMM - Operation & Maint. Manual PRP - Project Plan SDW - Shop Drawing
Document MTS - Material / Sample
OTS - Other Submittal RPT - Report SKT - Sketch
Code: Submittal
PRG - Programme SCH - Schedule SPN - Specification
MST - Method Statement

FORM REF AUTHORISED BY DEPARTMENT DATE OF ISSUE ISSUE NUMBER PAGE NUMBER
CON 204 Construction Director Construction February 2019 02 Page 1 of 1