Rev 00 18 Sep 2022 Approval Eng. Melvin Mathew Eng. Alaa Al Jaberi Eng. Amro El Gazzar
Prepared By Reviewed By Approved By
Revision Date Purpose
(ARABI) (AGCO) (AICI)
Super Hornet F-18 Al Jaber Air Base, Kuwait
Contract #: MATOC W912ER18D0004
TASK ORDER W912ER-21-F-0131
INDEX OF DOCUMENTS
Part 1: Introduction……………………………………………………………….
SIGNATURE SHEET
Prepared by:
X
Melvin Mathew - Arabi
QC Engineer
Reviewed by:
X
Eng. Alaa Al Jaberi-AGCO
Alt QC Manager
Approved by:
X
Eng. Amro El Gazzar-AICI
QC Manager
I certify that this submittal is accurate, is in strict conformance with all contact requirements and has
been thoroughly coordinated and cross checked against all other applicable disciplines to prevent the
omission of vital information, that all conflicts have been resolved, and that repetition has been
avoided. It is complete and in sufficient detail to allow ready determination of compliance with
contract requirements by the Contracting Officer.
PART 1. INTRODUCTION
1.1 Background Information
This submittal is intended to explain the Testing and Commissioning of Dedicated Outside
Air System and Air Handling Unit under section 01 33 00.
Scope of Responsibilities
Activity Procedure/Acceptance
Inspection/Test Points Recording Standards Sub-Contractor Comments
No Criteria/Documents Contractor Client (USACE)
(Arabi) (AGCO)
1. GENERAL/BEFORE EXECUTION
1.1 Readiness of All Drawing Project Specification Transmittal No. H R R
Conduct a preconstruction
1.3 Project Specification Minutes of Meeting H R W
quality control meeting.
2. MATERIAL RECEIVING
Storage/Inspection of
2.1 Transmittal No. Delivery Notes I S S
Materials
As per Approved MS
Inspection of DOAS Unit as per
2.2 Transmittal No: 23 81 00- MIR/Visual H I I
Delivery Note
1.1
3. DURING EXECUTION
4 DOCUMENTATION
Signature
Date
Super Hornet F-18 Al Jaber Air Base, Kuwait
Contract #: MATOC W912ER18D0004
TASK ORDER W912ER-21-F-0131
3 Ductwork Completed
4 Power circuit installed satisfactory
8 Control Complete
9 Correct Filters Installed
STARTUP
DESCRIPTION DESIGN DATA VERIFICATION
9 FAN SECTION:
10 Fan Pulley Dia. / Bore
11 Belt Size / Number
12 Motor KW / HP
13 Voltage
14 Amps
15 Fan Rotation
16 Motor RPM
Super Hornet F-18 Al Jaber Air Base, Kuwait
Contract #: MATOC W912ER18D0004
TASK ORDER W912ER-21-F-0131
CONTROLS:
18 Fan Control sequence verified
19 Calibrate Thermostat or Room Sensor
23 Fan RPM
24 Unit Voltage
25 Unit Amps
REMARK:
STARTUP
DESCRIPTION DESIGN DATA VERIFICATION
9 Condenser Fan Motor KW / HP
10 Voltage
11 Amps
12 Fan Rotation
REMARK:
3.1 AHU:
Description: Air Handling Unit (AHU)
Manufacturer: SKM
Country of Origin: Saudi Arabia
Indoor Unit Model No: MAH-0303M
Outdoor Unit Model No: AUMR110M
Location: Indoor – G116
Outdoor –
Mechanical Yard
Super Hornet F-18 Al Jaber Air Base, Kuwait
Contract #: MATOC W912ER18D0004
TASK ORDER W912ER-21-F-0131
Scope of Responsibilities
Activity Procedure/Acceptance
Inspection/Test Points Recording Standards Sub-Contractor Comments
No Criteria/Documents Contractor Client (USACE)
(Arabi) (AGCO)
1. GENERAL/BEFORE EXECUTION
1.1 Readiness of All Drawing Project Specification Transmittal No. H R R
Conduct a preconstruction
1.3 Project Specification Minutes of Meeting H R W
quality control meeting.
2. MATERIAL RECEIVING
Storage/Inspection of
2.1 Transmittal No. Delivery Notes I S S
Materials
As per Approved MS
Inspection of AHU Unit as per
2.2 Transmittal No: 23 81 00- MIR/Visual H I I
Delivery Note
1.1
3. DURING EXECUTION
4 DOCUMENTATION
Signature
Date
Super Hornet F-18 Al Jaber Air Base, Kuwait
Contract #: MATOC W912ER18D0004
TASK ORDER W912ER-21-F-0131
3 Ductwork Completed
4 Power circuit installed satisfactory
8 Control Complete
9 Correct Filters Installed
STARTUP
DESCRIPTION DESIGN DATA VERIFICATION
9 FAN SECTION:
10 Fan Pulley Dia. / Bore
11 Belt Size / Number
12 Motor KW / HP
13 Voltage
14 Amps
15 Fan Rotation
16 Motor RPM
Super Hornet F-18 Al Jaber Air Base, Kuwait
Contract #: MATOC W912ER18D0004
TASK ORDER W912ER-21-F-0131
CONTROLS:
18 Fan Control sequence verified
19 Calibrate Thermostat or Room Sensor
23 Fan RPM
24 Unit Voltage
25 Unit Amps
REMARK:
STARTUP
DESCRIPTION DESIGN DATA VERIFICATION
9 Condenser Fan Motor KW / HP
10 Voltage
11 Amps
12 Fan Rotation
REMARK: