JOB SAFETY ANALYSIS (JSA)

Project Name: CIVIL WORK Company:


Nama Project: Perusahaan: PT. DAEAH E&C

Work Activity:
Pekerjaan: LOADING UNLOADING WORK JSA No: KOIN/HSE/JSA/19-067 Rev 00

Work Location: Date Developed:


Lokasi Kerja: KINE PROJECT - LOTTE Dibuat Tanggal: 26 Mei 2022

Risk Matrix:
CONSEQUENCE
Disciplines will review likelihood and consequences in line 1 = Negligible 2 = Slight 3 = Moderate 4 = High 5 = Very High
with their specific parameters as noted
No injuries requiring any treatment. First aid treatment. Medical treatment required, Restricted Injuries resulting in; lost time, Single or multiple fatalities.
Work Case. permanent disability, amputation, or
surgery.

5 =Very Likely Is expected to occur M-5 H -10 VH-15 VH-20 VH-25

Will probably occur in most


LIKELIHOOD

4=Likely
circumstances M-4 H-8 H-12 VH-16 VH-20

3=Possible Should occur at some time L-3 M-6 H-9 H-12 VH-15

2=Unlikely Could occur at some time L-2 M-4 M-6 H-8 H-10

May occur only in exceptional


1=Very Unlikely circumstances L-1 L-2 L-3 M-4 M-5

Likelihood (L) 1 = Very Unlikely, 2 = Unlikely, 3 = Possible, 4 = Likely, 5 =Very Likely Consequence (C) 1 = Negligible, 2 = Slight, 3 = Moderate, 4 = High, 5 = Very High

Risk Rating (R) LOW [ 1-3 ] Broadly acceptable - Manage by MODERATE [ 4-6 ] Tolerable – With identified controls HIGH [ 8-12 ] Undesirable - Additional controls VERY HIGH [ 15- 25 ] Intolerable - Do not
routine procedures fully implemented required to reduce risk start activity

Page 1 of 8
JOB SAFETY ANALYSIS (JSA)

Residual
Risk
[L x C=R]
Activity Potential Hazards / Consequences
Persons Responsible
(Basic job steps) (What can go wrong) Control Measures/ Tindakan perbaikan
Penanggung jawab
Aktivitas (Langkah kerja) Potensi bahaya/ konsekwensi (Apa yang bisa salah?)
L C R

 The work does not match the


permit that already submitted
Preparation Work
(Karya tidak sesuai dengan izin  Conduct risk assessment first prior to make JSA
Create work permit & JSA and work permit (Melakukan risk assessment
yang sudah diajukan) 2 2 4 Supervisor
(Pekerjaan Persiapan terlebih dahulu sebelum membuat JSA dan work
 Unidentified risk (Risiko tak permit)
Buat izin kerja & JSA)
teridentifikasi)

 Workers who involve the work,


do not understand the work
plan and its hazards every step  Supervisors are required to provide an
of work (pekerja yang tidak explanation of potential hazards and how to
memahami bahayanya setiap prevent them.( Supervisor wajibmemberikan
Toolbox meeting 2 2 4 Supervisor
langkah kerja)
penjelasan tentang potensi bahaya dan cara
mencegahnya.)

Page 2 of 8
JOB SAFETY ANALYSIS (JSA)

Residual
Risk
[L x C=R]
Activity Potential Hazards / Consequences
Persons Responsible
(Basic job steps) (What can go wrong) Control Measures/ Tindakan perbaikan
Penanggung jawab
Aktivitas (Langkah kerja) Potensi bahaya/ konsekwensi (Apa yang bisa salah?)
L C R

 Use Radio for communication between


signalman and operator mobile crane
(Gunakan Radio untuk komunikasi antara
petugas sinyal dan derek bergerak operator)
 Conduct daily checklist for the crane(Melakukan
checklist harian untuk crane)
 Only competent/certified crew (Opt & Rigger)
who conduct the work (Hanya kru yang
kompeten/bersertifikat (Opt & Rigger) yang
melakukan pekerjaan)
 Make sure the personnel are fit to work
 Improper lifting equipment (Pastikan personel dalam kondisi fit untuk
(Alat angkat yang tidak tepat) bekerja)
 Use tag lines (Gunakan tag line)
 Unskilled crew  Use full body harness when height more than
(Team tidak terampil) 1,8 m (Gunakan full body harness saat
ketinggian lebih dari 1,8 m)
 Improper lifting gear
Lifting equipment preparation Supervisor, Scaffolder,
(Alat angkat yang tidak tepat)  Provide proper walking platform, including 2 2 4
(Persiapan peralatan angkat) standard for handrail (Menyediakan platform Rigger and opt
 Spreader Bar Placement berjalan yang tepat, termasuk standar untuk
(Penempatan Batang pegangan tangan)
Penyebar)  Proper placement for the lifting equipment
make sure access is free from material
 Personnel Fall (Personil Jatuh) placement (Penempatan yang tepat untuk
peralatan pengangkat)
 Use leather gloves (Gunakan sarung tangan
kulit)
 Install handrail to protect void area near
spreader bar installation( if any void)
(Pasang handrail untuk melindungi area void di
dekat pemasangan spreader bar (jika ada void)
• Make sure to install hard barricade and
clearance radius when lift (Pastikan memasang
barikade keras dan radius jarak bebas saat
mengangkat)

Page 3 of 8
JOB SAFETY ANALYSIS (JSA)

Residual
Risk
[L x C=R]
Activity Potential Hazards / Consequences
Persons Responsible
(Basic job steps) (What can go wrong) Control Measures/ Tindakan perbaikan
Penanggung jawab
Aktivitas (Langkah kerja) Potensi bahaya/ konsekwensi (Apa yang bisa salah?)
L C R

 Conduct PRE JOB SAFETY MEETING prior to


socialize the JSA and Lifting/rigging plan
(Melakukan PRE JOB SAFETY MEETING
sebelum mensosialisasikan JSA dan rencana
Lifting/rigging)
 Make sure all lifting gears are inspected by 3rd
party and tag safe to use proven by colour code
sticker
(Pastikan semua roda pengangkat diperiksa
oleh pihak ke-3 dan tag aman digunakan
dibuktikan dengan stiker kode warna)
 The lifting gears capacity shall refer to the lifting
plan (Kapasitas alat pengangkat harus mengacu
 Improper lifting gears pada rencana pengangkatan)
(Alat angkat yang tidak tepat)  All lifting point shall be calculated on the lifting
plan (Semua titik pengangkatan harus dihitung
 Not complied the lifting plan pada rencana pengangkatan)
(Tidak memenuhi rencana  All sharp objects must be protected properly by
Setting / Connected Lifting gears to to using cut pipe and cut webbing sling, cut tire and
pengangkatan)
lifting material (Mengatur /
shall 3 times widen/thicker.( Semua benda tajam 3 2 6 Rigger, Lifting SPV
Menghubungkan gigi Pengangkat ke
bahan pengangkat)  Hand and finger harus dilindungi dengan baik dengan
pinched(Tangan dan jari menggunakan pipa potong dan webbing sling
terjepit) potong, ban potong dan harus 3 kali lebih
lebar/tebal.)
 Fall down (Jatuh)  All rigging team shall wear proper hand glove for
rigger (Heavy duty glove)
Semua benda tajam harus dilindungi dengan
baik dengan menggunakan pipa potong dan
webbing sling potong, ban potong dan harus 3
kali lebih lebar/tebal.
 Signal man shall be always remind rigger to
watch out the hands when starting tension
(Signal man harus selalu mengingatkan rigger
untuk berhati-hati dengan tangan saat memulai
ketegangan)
 Always ensure the slings are installed as per
lifting plan (Selalu pastikan sling dipasang
sesuai rencana pengangkatan)

Page 4 of 8
JOB SAFETY ANALYSIS (JSA)

Residual
Risk
[L x C=R]
Activity Potential Hazards / Consequences
Persons Responsible
(Basic job steps) (What can go wrong) Control Measures/ Tindakan perbaikan
Penanggung jawab
Aktivitas (Langkah kerja) Potensi bahaya/ konsekwensi (Apa yang bisa salah?)
L C R

 Make sure the cranes are inspected prior to use


and recorded properly
(Pastikan derek diperiksa sebelum digunakan
dan dicatat dengan benar)
 Each crane shall refer to lifting plan to ensure
the radius of lifting (Setiap derek harus
mengacu pada rencana pengangkatan untuk
memastikan radius pengangkatan)
 Each signalman and rigger of each crane shall
follow the lifting plan and instructed by lifting
supervisor (Setiap signalman dan rigger dari
setiap crane harus mengikuti rencana
pengangkatan dan diinstruksikan oleh
pengawas pengangkatan)
 Lifting supervisor shall lead and giving
command to crane (Pengawas pengangkatan
harus memimpin dan memberi perintah kepada
derek)
 Each lifting point shall be always checked for
 Miscommunication ensuring safe rigging (Setiap titik pengangkatan
(Miskomunikasi) harus selalu diperiksa untuk memastikan
pemasangan yang aman)
 Lack Rigging inspection  Always check the wind speed (Selalu periksa
Loading / Unloading (Kurangnya pemeriksaan kecepatan angin) Operator, Signalman,
Rigging)  Conduct final inspection for the rigging before 3 2 6
(Memuat / Membongkar) Lifting SPV
starting flip up (Lakukan pemeriksaan akhir
 Dropped object untuk tali-temali sebelum memulai flip up)
(Benda jatuh)  Clearance the lifting radius and only authorized
person who involve the activity (Bersihkan
 Wind Speed(Kecepatan angin) radius pengangkatan dan hanya orang yang
berwenang yang terlibat dalam aktivitas
tersebut)
 Install barricade and safety sign (Pasang
barikade dan tanda keselamatan)
 Provide enough HT/Radio for all involve lifting
crew and check the frequency and its battery
(Sediakan HT/Radio yang cukup untuk semua
kru angkat dan periksa frekuensi dan
baterainya)
 Rigger who control tag lines shall keep the

Page 5 of 8
JOB SAFETY ANALYSIS (JSA)

Residual
Risk
[L x C=R]
Activity Potential Hazards / Consequences
Persons Responsible
(Basic job steps) (What can go wrong) Control Measures/ Tindakan perbaikan
Penanggung jawab
Aktivitas (Langkah kerja) Potensi bahaya/ konsekwensi (Apa yang bisa salah?)
L C R

 Make sure lifting permit is issued (Pastikan izin


pengangkatan dikeluarkan)
 Wear mandatory PPE and additional PPE
(Kenakan APD wajib dan APD tambahan)
 Conduct brief prior to work and socialized the
job safety analysis (Melakukan briefing sebelum
bekerja dan mensosialisasikan analisis
keselamatan kerja)
 Use proper heavy equipment (Gunakan alat
berat yang tepat)
 Use only inspected lifting gear by third party
(Gunakan hanya alat pengangkat yang diperiksa
oleh pihak ketiga)
 Install safety sign or barricade that inform lifting
activity (Pasang tanda keselamatan atau
barikade yang menginformasikan aktivitas
pengangkatan)
 Clearance the swing area, make sure radius
 Fall (Jatuh)
from access already calculate not to near with
access (Pasang safety sign atau barikade yang
 Uncontrolled material
menginformasikan • Bersihkan area swing,
(Bahan yang tidak terkontrol)
Loading / Unloading pastikan radius dari akses sudah dihitung
Supervisor, rigger, opt
jangan sampai dekat dengan aktivitas 3 2 6
(Memuat / Membongkar)  Falling object (Benda jatuh) safetyman
accesslifting)
 Safety standby on loading unloading area
 Swing Material hit other object (safety bersiap di area bongkar muat)
(Bahan Ayunan mengenai
 Install safety sign “ Do not to near Loading
benda lain)
Unloading Area” (Pasang safety sign “ Jangan
dekat Bongkar Muat”)
 Make sure operator only swing opposite
direction from access (Pastikan operator hanya
mengayunkan arah berlawanan dari akses)
 Blow whistle if material swing (Tiup peluit jika
material berayun)
 Attention to electric cable line (Perhatian pada
jalur kabel listrik)
 Make sure swing radius distance from electric
cable is safe (Pastikan jarak radius ayunan dari
kabel listrik aman)
 Use take line both of side to control material

Page 6 of 8
JOB SAFETY ANALYSIS (JSA)

Residual
Risk
[L x C=R]
Activity Potential Hazards / Consequences
Persons Responsible
(Basic job steps) (What can go wrong) Control Measures/ Tindakan perbaikan
Penanggung jawab
Aktivitas (Langkah kerja) Potensi bahaya/ konsekwensi (Apa yang bisa salah?)
L C R

 Make sure the rigging condition and stability of


material prior to get closer to disconnect the
lifting gears (Pastikan kondisi rigging dan
kestabilan material sebelum mendekat untuk
melepas lifting gear)
 Do not place their feet or body under suspended
load (Jangan letakkan kaki atau tubuh mereka di
bawah beban yang ditangguhkan)
 Failure of lifting gear
 Make sure more the tag line or materials is
(Kegagalan alat pengangkat)
under controlled prior to disconnect (Pastikan
 Hit by dropping object
tag line atau material lebih terkontrol sebelum 3 2 6 Rigger
Disconnect lifting gear from lifting diputuskan)
(Pukul dengan menjatuhkan
material  Wear rigger glove (Kenakan sarung tangan
benda)
rigger)
(Lepaskan alat pengangkat dari bahan  One person lead to always remind watch out the
pengangkat)  Hand and finger pinched
hands, at least 2 persons to disconnect
(Tangan dan jari terjepit)
shackle/slings (Satu orang memimpin untuk
selalu mengingatkan jaga tangan, minimal 2
 Fall from height
orang untuk melepas belenggu/sling)
(Jatuh dari ketinggian)
 Provide scaffold or proper aluminium ladder as
access to top girder (Sediakan perancah atau
tangga aluminium yang sesuai sebagai akses ke
gelagar atas)
 Wear full body harness and 100% clip on
(Kenakan sabuk pengaman seluruh tubuh dan
100% clip on)

 Make sure the crane is parked on solid ground


 Unsafe crane position (Pastikan derek diparkir di tanah yang kokoh)
(Posisi derek tidak aman)
Finishing  Install safety sign or barricade under the hook
 Improper lifting equipment position (Pasang tanda pengaman atau barikade 2 2 4 Supervisor and worker
storage di bawah posisi kait)
(Penyimpanan alat pengangkat
yang tidak tepat)  Save the lifting gear properly (Simpan alat
pengangkat dengan benar)

Page 7 of 8
JOB SAFETY ANALYSIS (JSA)

Sign On: I confirm that the JSA has been explained and its contents are clearly understood. I clearly understand the controls in this JSA must be applied; otherwise
work is to cease immediately.

Saya mengkonfirmasi bahwa JSA telah dijelaskan dan isinya dipahami dengan jelas. Saya memahami dengan jelas kontrol dalam JSA ini harus diterapkan; jika tidak, pekerjaan
akan segera dihentikan

Prepared by : Acknowledge by: Cheked by: Approved by:

Name : HILMI Name : NAM UN DONG Name : MEI TOTOK Name : Name :

Position : HSE MANAGER Position : SITE MANAGER Position : ENGINEER Position : Position :

Page 8 of 8