You are on page 1of 4

MELUT BASIN OIL DEVELOPMENT

CPECC HSE DEPARTMENT


Palouge Power Plant II Project

SUBJECT:JOB HAZARD ANALISYS Document No.: PDOC/671-JHA-06

SCAFFOLDING (Erection and Dismantling)

JOB HAZARD/SAFETY ANALISYS (JHA/JSA)


Work
Hazards
Description Precautions (Preventive Measure)
Potential Safety &
Sequence of Job Work Recommended Corrective Action
Hazards/Impacts
steps

Site Inspection work Obstructions or Conduct a toolbox talk with all teamwork before work
preparation & restricted access, start to explain tasks and hazards associated to work
Transport of scaffold hot or cold surfaces, activities.
material to site moving of materials Follow safe scaffolding procedures and know JHA with
during operations and permit authorities to minimize exposure
transportation. to hazards, plan escape routes & be aware of wind or
heavy rain strength & direction.

Slips, Trips and Due care and attention. Be alert


Falls due to Make good housekeeping at work area.
obstacles, Access/Egress and walkways to be free from obstacles
obstructions, and unnecessary tools and materials.
restricted access.
Injury due to Signal man to give drivers and equipment operator’s safe
transportation of movement direction.
material and moving Drivers & Equipment operators to minimize unnecessary
equipment maneuvering to reduce exposure of hazards.
Maintain a good Housekeeping and safe proper storage
area.

Injury/damage Supervisor to Conduct a toolbox talk with all teamwork


related to before work start.
transportation Use correct Transportation and handling procedures.
operation and Be alert and stay away from moving Equipments, Trucks,
equipment handling Trailers, Dumpers and Cranes etc.
All heavy equipment must have back alarm when they
move to back direction.

1
Prepared by: CPECC HSE Department
Reviewed & Approved by: S. Sultan
Acting HSE Manager
MELUT BASIN OIL DEVELOPMENT
CPECC HSE DEPARTMENT
Palouge Power Plant II Project

SUBJECT:JOB HAZARD ANALISYS Document No.: PDOC/671-JHA-06

Injury / damage due Plan route to avoid other personnel and equipment.
to collision / impact Signalman must give signals to move equipment in safe
with other directions.
workgroups / Be alert and observe the work environment pay attention
equipment from other team work.

Injury / damage as a Use appropriate barricades and bunting to protect


result of dropping personnel and equipment.
tools and scaffold Use full PPE including Head Protection.
components. Be away from transported materials and be alert.
Transported material to be balanced, protected from
falling.
Scaffolding Erection Hot burns/Injury as Conduct and attend a toolbox talk before start to work.
a result of contact Use full Personnel Protective Equipment including Hand
with pipe-work Protection “Gloves”.

Injury due to limited Ensure scaffold has adequate safe Access for work and
egress in egress for any emergency situation.
emergency Access/Egress must be free from any obstacles.

Injury / damage as a Limit the access of personnel at work area during


result of dropping scaffolding erection.
tools and scaffold Use appropriate barricades safety warning tape &
components warning signs around work location area.
Use all required necessary PPE including Head
Protection.

Injury / damage due Erect and dismantle all scaffolds to comply with all legal
to scaffold collapse and site requirements.
Scaffold must be erected on compacted, rigid & leveled
soil.
Scaffold must be Braced and anchored to a rigid fixed
supports.

Injury / damage due All components to be checked prior to installation.


to damaged The scaffold competent person should make a final
components check to assure the safe use of the scaffolding.
causing failure

2
Prepared by: CPECC HSE Department
Reviewed & Approved by: S. Sultan
Acting HSE Manager
MELUT BASIN OIL DEVELOPMENT
CPECC HSE DEPARTMENT
Palouge Power Plant II Project

SUBJECT:JOB HAZARD ANALISYS Document No.: PDOC/671-JHA-06

Injury / damage Check specified limits of scaffold before utilization.


caused by scaffold Do not store excessive load and/or store heavy material
collapse due to more than max load designed.
excessive load on
scaffold

Injury / damage due Scaffold must only be erected by competent qualified


to scaffolding personnel.
erected by Scaffold competent person to check the scaffold erection
unauthorized prior to start use of the scaffold.
personnel

Injury / damage Competent qualified scaffolder supervisor to check


caused by Scaffold at all times.
scaffolding erected Do not use any scaffold without safe Access.
by persons with Be sure that scaffold have green tag ”Safe to use”
limited competency Scaffold to be erected only by completed person.

Injury / damage Scaffold must have hand rail, mid-rail and fixed platform.
caused by Use Full body harness & to be tight 100% all time
personnel falling working at height.
from scaffolding

Serious Injury & Use independent fall arrest system. 1.8m fall limit when
Fatality caused by you are working outside of platform handrails.
persons falling
working outside
scaffolding and not
using full body
harness.

Handover of scaffold Injury as a result of Check scaffold properly before attaching scafftag. Tag
incomplete scaffold, must be signed by qualified person. Use scaffold
loose boards, checklist.
kick-plates, etc Scaffold platform must have handrail/midtrial and toe
causing slips, trips boards to prevent falling of personnel and tools.
and falls Be sure that scaffold has been erected and completed
and with safe access “Green Tag”.

3
Prepared by: CPECC HSE Department
Reviewed & Approved by: S. Sultan
Acting HSE Manager
MELUT BASIN OIL DEVELOPMENT
CPECC HSE DEPARTMENT
Palouge Power Plant II Project

SUBJECT:JOB HAZARD ANALISYS Document No.: PDOC/671-JHA-06

Dismantle scaffold Non proper scaffold Stack scaffold gear in a safe area and remove any defect
storage material or damage scaffolding component from site. Keep site
components cause clean and in a good housekeeping.
Injury results.
Injury results from Maintain a good housekeeping at all times to reduce
untidy worksite hazards to a minimum.

Injury / damage Inspect scaffold to ensure it is clear of debris before


caused by falling turning boards and dismantling.
objects Barricade the area and put safety warning signs, “Keep
Away Falling Objects”.

Injury / damage Adhere to Correct sequence & procedure for dismantling


caused by incorrect of scaffold.
sequence of Dismantling of the scaffold must be only by qualified
dismantling competent scaffolder.

4
Prepared by: CPECC HSE Department
Reviewed & Approved by: S. Sultan
Acting HSE Manager