You are on page 1of 21

iRISE/HSMS/JHA/SEM/01 REV#00 EFF DATE: 01/04/2021

iRISE INDIA PVT.LTD


JHA (JOB HAZARD ANALYSIS)
DEPARTMENT , SECTION & DATE Engineering & Projects

LOCATION OF JOB: CDCP


JOB DESCRIPTION: STRUCTURAL ERECTION & MAINTAINANCE
TEAM MEMBERS:

SL NO. SEQUENCE OF BASIC JOB STEPS POTENTIAL HAZARDS SAFEGUARD/CONTROL TO BE PUT IN PLACE RESPONSIBILITY REMARKS

Safety Induction training a & specialized training by Safety & dept. will be ensured for all workers & supervisors before starting the job. Daily tools
kit meeting/tool box talk/ safety induction will be given to workmen before to start of the job. It must be ensured that workmen have clearly
understood the job related hazards & its preventive measures half hour safety timings will strictly be followed before starting and after completion
of work for good housekeeping and safe condition of site.
Hazards will be identified/Permit to work must be assessed before to start work. All proximity hazards along with corresponding precautions will be
Unawareness of safety rule job hazards, poor work made known to workmen & other concerned persons.
knowledge and not using safety appliance may Working clearance/Permit to work must be taken duly signed by concerned persons before to start of job. SWP will be amended at the site for job
cause of injury/accident unwritten on procedures & need to be performed.
Incident/ Accident due to start of work without All staff and workmen will be made aware about all road safety norms.All kinds of Standard safety appliances as per related hazards will be provided
doing Hazards identification & Risk Assessment. to workman like safety shoes, safety helmet, hand gloves, safety goggles, Face shield and full body harness with double lanyards for working at
Job without work permit & SWP not amended to height etc. All Engineers/Supervisors and workmen will be ensured aware about job related and applicable safety standards before starting the job.
new job appeared during work execution. All hazards/precaution will be briefed to workmen before to starting the job. All workmen & Supervisor must have valid safety induction training
Unawareness of road safety norms.Wandering of cards and gate passes.Adequate illumination (more than 75 Lux) will be ensured during night work. Standard scaffold will be made and used if
1 General Guide Lines (Before persons beyond work area or permitted area,Use required. SAFETY OFFICER & SITE INCHARGE
Starting job) of sub-standard PPE’sInjury due to work in poor Medically fit & height trained persons will only be allowed to work at height. Full body harness will be used for work above 2 meters height with
illuminated area. Fall from scaffold.Fall of person standard life line.
due to not wearing or anchoring full body harness. No job shall be executed in absence of Supervisor /Safety Supervisor. Housekeeping will be done on daily basis and materials will be kept safely and
Job without Supervisor & poor housekeeping. in order. Disposal of scrap to the designated place.
Injury & Fire aggravated due to lack of First Aid First Aid box valid with medicine and Fire extinguishers will be kept ready at all prominent places at site.
materials and fire extinguishers near to site. Red lamp, Foreman with whistle, safety steward, display/caution boards etc. will be provided as per requirement at site.
Accident in absence of caution board. Materials related to job must be kept at site systematically .
Accident while handling materials kept.
Unsystematically

North, East, West, South- Unwanted structure First of all go to the working site and identified the six directional hazards.
or material, moving or rotatory equipment, Fill up the back side of the work permit form no- HMC- PRO/GEN/4003 and its mitigation measured has been taken.
splashing, dust, electrical equipment, falling of The concern department /contractor supervisor Explain the identified hazard and its counter measure to his co-workers
material, sharp age structure, barricading, stability
of adjutants structure or building. Presence of
excessive hot and cold, chemically hazards,
radioactive material.
Top – falling of unwanted material, stability of roof
2 Identification of SIX- Directions or structure, splashing. SAFETY OFFICER & SITE INCHARGE
Hazard at site. Bottom-Stability, slip and trip, Unwanted and non-
specified
item to whom person may stand.

Training of SOP to all working person.


Job hazards, work knowledge, not use of safety Working labor must know the use of safety appliances. Following minimum things are important while taking the clearance:
3 Pre-requisites before work appliances may cause of injury, accident and People will never wear loose clothes. Cotton garments to be used. SAFETY OFFICER & SITE INCHARGE
permit. damage of property Unawareness of safety rules. Good condition TSL standard PPE to be used properly. People know about the emergency preparedness.
People know about the rescue operation during emergency. Before starting the job joint visit to site by the department personal along with the
Contractor’s supervisor to make a safe plan to execute the job safely & ground reality to be shown

1. Discussion of SOP
3 Conduct toolbox meeting 2.Discuss the six directional hazards. Fill the TBM form and Note Down the discussion points SAFETY OFFICER & SITE INCHARGE
3.Discuss the safety Performance.

Accident due to unsafe driving, wrong place Driver must use seat belt while driving. Follow road safety rules.
4 Transportation of welding m/c by parking, bad condition of road, bad condition of Follow no entry/safety timing. SAFETY OFFICER & SITE INCHARGE
4 wheeler store to the site tempo, unawareness of driver re-road safety of Only skilled & experienced driver to be deployed
TSL

During loading proper hand gloves & lifting rope to be used. Only tested lifting tools to be used & checked for physical damage before use.
Loading & Unloading of welding Sufficient man power to be provided during manually loading.
5 m/c at site & manually shifted at Loading & Unloading of welding m/c at site & Placement of vehicle at correct location & fixing of scotch block at both side of the wheel. SAFETY OFFICER&SITE ENGINEER
workplace manually shifted at workplace During unloading proper hand gloves and lifting ropes to be used.
Sufficient man power to be provided.
Welding m/c to be kept under shade, dry & plain area
Competent/authorized and licensed electrician will only be permitted to work on electrical lines. Proper electrical connection will be provided to
6 Connection of welding m/c with Electrical shock Injury during cable laying & machine. Tapping of power sources, earthing for m/c will be ensured. Positive isolation will be done for power sources. Correct rated switches, SAFETY OFFICER & SITE INCHARGE
existing power DB termination Functional ELCB, Rubber mats, DCP type Fire Extinguisher, Fire buckets filled with dry sand
etc, will be ensured available at place.

Transportation of cylinder Cutting Accident due to unsafe driving wrong place Driver must use seat belt while driving. Follow road safety rules.
7 hose by 4wheeler from store to parking bad condition of road bad condition of
tempo , unawareness of Follow no entry/safety timing. SAFETY OFFICER & SITE INCHARGE
the site driver re:- road safety of TSL. Only skilled & experienced driver to be deployed.

During loading proper hand gloves & lifting rope to be used. Only tested lifting tools to be used & checked for physical damage before use.
Unloading of cylinder and hose at Injury to person due to slippage of cylinder during
manual loading.
Sufficient man power to be provided during manually loading. During unloading proper hand gloves and lifting rope to be used.
Proper & good condition trolley to be used during unloading of cylinders.
8 site & manually shifted at Injury to person due to slippage of cylinder during All cylinders to place at open space area. SAFETY OFFICER & SITE INCHARGE
workplace manual loading. Make sure all cylinder properly place on trolley in vertical position & fixed with chain (for oxygen Cylinder).
Proper cage to be provided for LPG cylinder.

Standard hose, tested regulator with double gauge & good condition cutting torch to be used.
9 Fixing of regulators & hose with Leakage of hose. Ensure the uses of three pipes cutting torches with flashback arrester. SAFETY OFFICER & SITE INCHARGE
cylinders. No standard regulator, hose, cutting torch Clamping of hose by proper jubilee clamps. LPG Cylinders should be covered with wet gunny bags.
Validated fire extinguisher to be provided near to the cylinder

Overloading, over- taking, high speed and wrong No overloading, overtaking, high speed, wrong side parking will be allowed. Materials shall be tightened properly with the body of vehicle avoid
side driving & parking toppling hazards.
10 Movement of trailer with Use of defective truck, Hydra Crane etc. Unfit & Damage truck/trailer/dumper will not be used for shifting of materials. Only experienced and valid license holder drivers/operators will be SAFETY OFFICER & SITE INCHARGE
material inexperienced operator engaged. deployed.
Improper approach for crane movement Sling will be checked physically before use with valid test certificate and lifted load should not exceed the SWP of used
sling & Hydra Crane.

Swing hazards Before removing turn buckle/chain make sure site support is provided on the trailer bed so that material should not slip from trailer.
11 Loading & Unloading of material Snapping of sling during loading & unloading of Crane/F15 will be placed on levelled surface. Crane/F15 will be positioned straight & not of twisted angle while lifting materials. Materials will be SAFETY OFFICER & SITE INCHARGE
by crane/Hydra (F15 materials lifted slowly and not by sudden jerk or thrust. Materials will be kept nearer to ground while lifting to avoid C.G. to go off.
Unfitness of crane Toppling hazard

Fire hazards & burn by gas cutting flame, heated All flammable materials removed from Gas cutting area. Valve protection caps shall be in place and secured gas cutter will use safety helmet, safety
surfaces, molten material etc. goggles, hand gloves, full sleeve, cotton dress, leg guard etc. gas cutting, hose pipe, regulator, cutting torch will be checked before use, cotton dress
Gas leakage from regulator,Damage of eye from will be used by welders/ gas cutters, waster will be kept ready at site. Ceramic cloth will be used to arrest spatters falling from height. Soap solution
ultra violet rays, toxic furnace and flying particles provided ground level barricaded during gas cutting at height.
Gas Cutting Of Structural Steel released from Gas cutter will always use dark cutting glass/face shield and nose mask while doing gas cutting job.
12 Materials For cutting point. Hose pipe to be checked. Physically before connecting. Hose should not be kinked tested to avoid bursting of pipe. SAFETY OFFICER & SITE INCHARGE
Fabrication and Erection Bursting of hose pipe & fire with excessive line Compressed gas cylinders shall be secured in upright position at all times except, if necessary, for short periods of time while handling.
pressure due to damaged or faulty Oxygen cylinders, in storage shall be separated from fuel gas
regulator. cylinders by min. Distance of 3 M “NO SMOKING” board will be displayed at cylinder storage yard. Max. 05 Nos. LPG Cylinder to be
Cylinders kept in horizontal position. kept at one place.
Oxygen & Fuel gas cylinder kept together

Injury due to not using PPE’s. Welder will use shock proof hand gloves, 18” long leather hand gloves, rubber shoes, face shield attached with helmet, other than mandatory PPE’s
Electrical shock/ Electrocution. proper approach will be made. Welders & Gas cutter will use cotton dress, safety goggles will also be used with welding screen helmet.
Improper approach for welding activities. Suitable socket joint will be used for extension of welding cable etc. Rubber mats will be provided in all D.B and Welding m/c. All electrical
Elect. shock due to wet soil or water accumulated- connections with Elec. DB & welding m/c etc. will be checked carefully with adequate earthing before use, and direct earthing to be provided in job,
Adequate earthing is must with all electrical
13 Welding Job Of Structural Steel area of welding m/c and job
location.Elect. shock due to equipment. SAFETY OFFICER & SITE INCHARGE
For fabrication & Erection use of substandard welding holder Welding machine will be kept in dry place and under shed to protect it from water.
Elect. shock due to ELCB not provided or Proper insulated and standard welding holder as specified by Tata Steel will be used.
not functioning.Elect. shock due to one switch Power connection to the welding machine will always be taken from main switch with proper power cable. ELCB will
used for many nos. of welding machines. be provided to W/M 30 mA ELCB will be uses.
Elec. Shock due touse of damaged welding cables Individual welding machine switch will be provided MRC flues will only be used for welding machines.
Good quality welding cable will be used & the same will not be allowed to pass through the good conductive substances.

Grinder will use face shield, 18 inch long leather hand gloves or sleeve guard, leather apron, Ear plug together with other required PPE’s will be
used. Grinding m/c to be kept on a start while not in use & Elect. Plug to be removed.
Grinding Job of Structural Steel Grinding Job of Structural Steel for Fabrication & Expiry date of grinding wheel will be checked before
14 for Fabrication & Erection Erection starting grinding job. Proper PPE’s will be used. Only skin fit hand gloves to be used. SAFETY OFFICER & SITE INCHARGE
Three pin plug / socket will be used. Electrical connection will provided as per Tata Steel standard. Proper earthing of 220V/Grinding machine will be
ensured. Grinding m/c should be connected with ELCB.
Fire extinguisher, sand/water buckets to be kept at working area.

Use all relevant PPE’s with skin fit hand gloves. Healthy and proper tools should be used.
Proper & safe approach for work should be provided.
Assembly Area should be barricaded & defined for the specific job so that no unknown persons could enter in the job area.
15 /Fit-up of Structural Steel Physical injuries to workmen during fit- up, If assembly bed is height(equal or more than 2 mtrs)then Full body harness with proper horizontal lifeline (with 12mm WRS)should be used for SAFETY OFFICER & SITE INCHARGE
Materials Alignment & Bolting job working at height.
Standard scaffolding should be used for the job.
Workplace orderliness should be checked & maintained on regular basis.
Standard, Physically tested & with valid calibration
Improper approach, Fall of person due to Proper approach provided for going upto height. An anchorage will be ensured capable of supporting a minimum dead weight of 2268 kilograms for
inadequate strength of anchorage every person attached to it. An anchorage is often a beam, girder, column or floor. A personal fall arrest system will be used and followed consisting
Fall of person due to use of substandard safety of an anchorage, connectors, a body harness and double lanyards.
belts or substandard fall arrestor During erection of material at height safety belt and fall arrestor will be checked before use. And anchoring position also will be checked.
Untrained person at height work having no height All riggers/persons liable to work at height will be medically examined and made fit by authorized Doctors and will complete height training /test
test certificate. organized at Plot 2. They will keep a copy of the certificate with them.
Fall of person due to use of substandard lifeline. A horizontal lifeline may serve as a mobile fixture point for the attachment of lanyards lifeline. A lifeline must be wire rope of at-least ½ inch and O3
16 Working at height Fall of person due to long and open lanyards. Nos. u-clamps to be provided on each horizontal lifeline. SAFETY OFFICER & SITE INCHARGE
Falling asleep, poor lighting/illumination at Standard lanyard should be 1-inch sharps. Adjustable upto 8’. They should also have shock absorbing capacity and self- locking snap hooks.
approaches.Fall of materials Fatigue or workmen who have worked throughout the day shall not be allowed to work in night. Arrangement will be
Accident in lack of supervision made and ensured for adequate illumination at all approaches and other workplaces.No job will be allowed to different levels at a time. No person
Injury due to height work area not barricaded. will be allowed to move or work under overhead work.
Fall of person due to use of sub-standard ladder. Close monitoring & strict supervision will be ensured continuously at site.
Slip and fall of ladder due to incorrect positioning Ground area will be barricaded before working at height.
of ladder Standard ladder with handrail will be positioned for ascending and descending purpose.
Ladder with hook & base plate will be placed at 75 degree whenever required for work purpose.

Standard & Physically tested with Valid TPI certificate MEWP should be used for the job.
Regular routine inspection should be done by competent person.
Area should be be stable at firm & levelled surface as well as barricaded with Safety Cones and Tape properly.
Overload should be avoided as per Manufacturer’s instruction.
All the workmen should work with MEWP having valid Height Pass and wearing full body harness.
MEWP should be operated by only trained & experienced Operator.
Working at Height With MEWP Failure of MEWP Cradle should not move independently while persons standing as well as cradle should lower down or rested on the ground while not in use.
17 (Mobile Elevating Working Swing of MEWP MEWP should parked only designated place with proper barricading. SAFETY OFFICER & SITE INCHARGE
Platform) Toppling/Overturning of MEWP No work should be done with MEWP during Heavy wind, Rain etc.
Nobody should stand on the guardrail of Cradle.

Proper erection scheme will be made in consultation with dept. before starting major erection work, Proper & adequate capacity
crane/slings/ropes/pulley/winch etc will be insured. Signalman with adequate experience will be provided Erection sequence will be decided and
materials will be kept accordingly.
Unawareness of job knowledge may cause of Proper & adequate capacity crane/ slings/ropes/pulley/winch etc. will be insured. All tools & tackles/ winch will be ensured to have test certificate,
injury/accident. certified by competent authority. Physical checking of tools- tackles will be done before starting the job. Equal length slings of adequate capacity
Shearing of sling/rope/pulley shall be provided for lifting the load. Sling will be placed at center of materials to keep the materials horizontal and guy rope will be provided for
Physical injury. control of free movement of the materials. No materials will be allowed to stand under suspended load/. Proper padding of sling will be done so
18 ERECTION OF HEAVY STRL. STEEL Movement of crane that no sharp edge can damage the sling. SAFETY OFFICER & SITE INCHARGE
BY CRANES. injury while making leveling.Wrong placing of sling Foreman with whistle on either side of the erection area will be deputed for controlling of the cane. All workmen will be given instruction to take
Damage due to hitting to existing structures/ pipe proper attention about crane movement. Guide rope will be used for proper monitoring of structure to prevent swinging of the same while lifting by
lines by crane and materials. crane.
Fall of person and materials from height. Proper PPE’s will be used. Adequate size of packing will be provided on ground for keeping materials.

Only physically tested, approved brand as per TSL standard and with valid TPIC CPB should be used for the job.
Daily Routine inspection of CPB, rope pulley should be done.
Failure of CPB Materials should be lifted as per SWL.
Erection of Strl. Steel by Use of damaged Rope pulley Lifting scheme should be prepared and approved prior to start erection work.
19 CPB/Rope Pulley/ Manually Breakage of sling and Chain link of CPB. Erection/Lifting area should be barricaded from surroundings. SAFETY OFFICER & SITE INCHARGE
Physical injuries to workmen Only Trained and experienced Riggers, Foreman/Sarong should be deployed for the job.

Proper scaffolding will be provided for doing the job as per TSL standard.
Proper “PPE”S provided.
Use proper full body harness & be careful.
Removing scaffolding Fall & slip of men and materials. Use all relevant PPE’s & proper handling with care.
20 & all temporary supporting Physical injuries due to improper handling & fall. SAFETY OFFICER & SITE INCHARGE
structure.

Hindrance of approach. Working area shall be kept clean & tidy.


21 Housekeeping. -Obstruction of object. Separate bins to be provided for scraps. Approach to the work location will kept clear. SAFETY OFFICER & SITE INCHARGE
Scraps will be kept on the barricade area & will be disposed periodically.

Injury of people while removing damaged liner Use hand gloves


Removed and disposed plate. Don’t clean in bare hand.
22 Damaged / Parts / Channel / Finger injury during cleaning whole area/removed Keep damaged plate in proper way. SAFETY OFFICER & SITE INCHARGE
Grating liner area. If pathway goes below the working area, then barricade the area or anybody should present below working area for awaking to others.
Dusty environment. Fire hazard Use dust mask & safety goggles.
Disposed the wastage to the proper demarcated area

Falling of material Flying of dust Flying gas cutting Hold the material in proper way and by proper means being dismantled to avoid falling.
spatter Barricade the area.
23 Dismantling Falling hot material. dust generate Use proper scaffolding if required. SAFETY OFFICER & SITE INCHARGE
Dust pollution Noise pollution. Confined space if any take the confined space work permit. Position of the working person to be safe and stable by keeping the safe distance from
Contamination of soil and water the dismantling material and structure.
Scrap generation The person should have the sufficient skill and knowledge about the job and keeping his body parts safely.
Remove all persons and scrap etc. made the area clean from site before returning the clearance.
24 Emergency preparedness Fire Work permit to be returned using standard format to authorized person. SAFETY OFFICER & SITE INCHARGE
If power getting is required, after removing the positive isolation lock, raise the power clearance form

PPES REQUIRED REQUIRED TOOLS AND EQUIPMENTS REQUIRED TRAINING SPECIAL SKILLED EMPLOYEES

Fire protection.- water bucket, ceramic cloth, Fire


extinguisher – ABC type.
SAFETY SHOE,SAFETY GOGGALS,FULL
BODY HARNESS,HELMET,HOLO SOP, FIRE SAFETY,ROAD SAFETY RULE, IPAF TRAINING,WORKING AT HEIGHT, EMERGENCY PREPARDNESS
HELMET,WALKY TALKY,SAFETY JACKET

PPEs - Use all PPEs(Safety Shoes, Helmet, Safety,


goggles, Shin Guard) while loading and unloading
the tools and tackles

Prepared By Approved By
iRISE/HSMS/JHA/RSLU/01 REV#00 EFF DATE: 01/04/2021
iRISE INDIA PVT.LTD
JHA (JOB HAZARD ANALYSIS)

DEPARTMENT , SECTION & DATE Mechanical Maintenance

LOCATION OF JOB: COKE PLANT


JOB DESCRIPTION: Repairing/Servicing of lifter unit

SL SEQUENCE OF BASIC
POTENTIAL HAZARDS SAFEGUARD/CONTROL TO BE PUT IN PLACE RESPONSIBILITY REMARKS
NO. JOB STEPS

Workers physical 1) Check the physical condition of the workers. Talk with the persons and question him about the condition of health. Observe the behavior and response of
1
fitness/behavior checking. Collapse/faint the person. 2) The person should not be allowed for the job if health condition is not good. . SAFETY OFFICER&SITE ENGINEER

Safety Induction training at Plot-2 & specialized training by Safety & Ergonomics dept. will be ensured for all workers & supervisors before starting the job.
Daily tools kit meeting/tool box talk/ safety induction will be given to workmen before to start of the job. It must be ensured that workmen have clearly
understood the job related hazards & its preventive measures half hour safety timings will strictly be followed before starting and after completion of work
for good housekeeping and safe condition of site.
Unawareness of safety rule job hazards, poor work Hazards will be identified/Permit to work must be assessed before to start work. All proximity hazards along with corresponding precautions will be made
knowledge and not using safety appliance may cause of known to workmen & other concerned persons.
injury/accident Working clearance/Permit to work must be taken duly signed by concerned persons before to start of job. SWP will be amended at the site for job unwritten
Incident/ Accident due to start of work without doing on procedures & need to be performed.
Hazards identification & Risk Assessment. All staff and workmen will be made aware about all road safety norms.All kinds of Standard safety appliances as per related hazards will be provided to
Job without work permit & SWP not amended to new workman like safety shoes, safety helmet, hand gloves, safety goggles, Face shield and full body harness with double lanyards for working at height etc. All
job appeared during work execution. Engineers/Supervisors and workmen will be ensured aware about job related and applicable safety standards before starting the job. All hazards/precaution
Unawareness of road safety norms.Wandering of will be briefed to workmen before to starting the job. All workmen & Supervisor must have valid safety induction training cards and gate passes.Adequate
General Guide Lines (Before persons beyond work area or permitted area,Use of illumination (more than 75 Lux) will be ensured during night work. Standard scaffold will be made and used if required.
2
Starting job) sub-standard PPE’sInjury due to work in poor Medically fit & height trained persons will only be allowed to work at height. Full body harness will be used for work above 2 meters height with standard SAFETY OFFICER&SITE ENGINEER
illuminated area. Fall from scaffold.Fall of person due life line.
to not wearing or anchoring full body harness. No job shall be executed in absence of Supervisor /Safety Supervisor. Housekeeping will be done on daily basis and materials will be kept safely and in
Job without Supervisor & poor housekeeping. order. Disposal of scrap to the designated place.
Injury & Fire aggravated due to lack of First Aid First Aid box valid with medicine and Fire extinguishers will be kept ready at all prominent places at site.
materials and fire extinguishers near to site. Red lamp, Foreman with whistle, safety steward, display/caution boards etc. will be provided as per requirement at site.
Accident in absence of caution board. Materials related to job must be kept at site systematically * as per TPM check list)
Accident while handling materials kept.
Unsystematically

North, East, West, South- Unwanted structure or First of all go to the working site and identified the six directional hazards.
material, moving or rotatory equipment, splashing, Fill up the back side of the work permit form no- HMC- PRO/GEN/4003 and its mitigation measured has been taken.
dust, electrical equipment, falling of material, sharp The concern department /contractor supervisor Explain the identified hazard and its counter measure to his co-workers
age structure, barricading, stability of adjutants
Identification of SIX- Directions structure or building. Presence of excessive hot and
3
Hazard at site. SAFETY OFFICER&SITE ENGINEER
cold, chemically hazards, radioactive material.
Top – falling of unwanted material, stability of roof or
structure, splashing.
Bottom-Stability, slip and trip, Unwanted and non-
specified
1. Discussion of SOP
2.Discuss the six directional hazards.
5 Conduct toolbox meeting 3.Discuss the safety Performance. Fill the TBM form and Note Down the discussion points SAFETY OFFICER&SITE ENGINEER

Opening between pulleys & rope drum. Electrical Opening between pulleys & rope drum.
Servicing/Replacement of drive power cables.
Constant space between L.T. Drives & columns. Electrical power cables.
6
unit Main hoist & Auxiliary drive Constant space between L.T. Drives & columns. SAFETY OFFICER&SITE ENGINEER
Round holes at LT tracks side. Round holes at LT tracks side

Opening between pulleys & rope drum. Opening between pulleys & rope drum.
Servicing/ Replacement of L.T. Electrical power cables. Electrical power cables.
7 Drive Unit Constant space between L.T. Drives & columns. SAFETY OFFICER&SITE ENGINEER
Constant space between L.T. Drives & columnsRound
holes at LT tracks side Round holes at LT tracks side

Movement of Vehicle in front of store. Laying of new rope out side lifter or putting the rope in druTower the propped end rope from lifter & jointing with new rope.
Opening between rope drum and pulleys. Lifting the new rope in rope drum.
8 Rope Replacement Electrical cables pane Dust Eye end rope lifting and duck yard.
Removal of old rope.
SAFETY OFFICER&SITE ENGINEER
in old steel yard. Alignment of rope

Open area around heat shield. Dismantling of old fixed pulley from lifter cabin & fitting of new pulleys. Dismantling of
Replacement of rope pulleys. Opening between rope drum & pulleys existing pulleys from hook assembly & fitting the new one. SAFETY OFFICER&SITE ENGINEER
Electric wires Bolt tightening

Charging trolley. Lifting & stacking the hook assembly at charging device flour.
Opening of lifter lifting area. Clamping the hooks after lowering at charging device.
9 Servicing of Hook assembly. Servicing of all pins rollers of hook assembly & hook supporting frame repairing. SAFETY OFFICER&SITE ENGINEER
Electrical cables Taking the hook assembly at initial position

PPES REQUIRED REQUIRED TOOLS AND EQUIPMENTS REQUIRED TRAINING SPECIAL SKILLED EMPLOYEES

Fire protection.- water bucket, ceramic cloth, Fire


SAFETY SHOE,SAFETY extinguisher – ABC type.
GOGGALS,FULL BODY
HARNESS,HELMET,HOLO SOP, FIRE SAFETY,ROAD SAFETY RULE, IPAF TRAINING,WORKING AT HEIGHT, EMERGENCY PREPARDNESS MAN LIFET OPERATER
HELMET,WALKY
TALKY,SAFETY JACKET
PPEs - Use all PPEs(Safety Shoes, Helmet, Safety,
goggles, Shin Guard) while loading and unloading
the tools and tackles

Prepared By Approved By
iRISE/HSMS/JHA/GMDD/01

DEPARTMENT , SECTION & DATE

LOCATION OF JOB:
JOB DESCRIPTION:
TEAM MEMBERS:
SL SEQUENCE OF BASIC JOB
NO. STEPS

General Guide Lines (Before


1 Starting job)
General Guide Lines (Before
1 Starting job)

Identification of SIX- Directions


2
Hazard at site.
Pre-requisites before work
3 permit.

3 Conduct toolbox meeting

4 Cleaning

Bearing Checking cleaning &


5
Greasing

Checking of gates & Liner plate


6
replacement
Gland packing providing in Gate
7
2nd and return of Permit

8 Emergency preparedness

PPES REQUIRED

SAFETY SHOE,SAFETY GOGGALS,FULL


BODY HARNESS,HELMET,HOLO
HELMET,WALKY TALKY,SAFETY JACKET

Prepared By
JHA
Mechanical Maintenance

Coke Plant
General Maintenance od Discharging Device

POTENTIAL HAZARDS

Unawareness of safety rule job hazards, poor work


knowledge and not using safety appliance may
cause of injury/accident
Incident/ Accident due to start of work without
doing Hazards identification & Risk Assessment.
Job without work permit & SWP not amended to
new job appeared during work execution.
Unawareness of road safety norms.Wandering of
persons beyond work area or permitted area,Use
of sub-standard PPE’sInjury due to work in poor
illuminated area. Fall from scaffold.Fall of person
due to not wearing or anchoring full body harness.
Job without Supervisor & poor housekeeping.
Injury & Fire aggravated due to lack of First Aid
materials and fire extinguishers near to site.
Accident in absence of caution board.
Accident while handling materials kept.
Unsystematically
Unawareness of safety rule job hazards, poor work
knowledge and not using safety appliance may
cause of injury/accident
Incident/ Accident due to start of work without
doing Hazards identification & Risk Assessment.
Job without work permit & SWP not amended to
new job appeared during work execution.
Unawareness of road safety norms.Wandering of
persons beyond work area or permitted area,Use
of sub-standard PPE’sInjury due to work in poor
illuminated area. Fall from scaffold.Fall of person
due to not wearing or anchoring full body harness.
Job without Supervisor & poor housekeeping.
Injury & Fire aggravated due to lack of First Aid
materials and fire extinguishers near to site.
Accident in absence of caution board.
Accident while handling materials kept.
Unsystematically

North, East, West, South- Unwanted structure


or material, moving or rotatory equipment,
splashing, dust, electrical equipment, falling of
material, sharp age structure, barricading, stability
of adjutants structure or building. Presence of
excessive hot and cold, chemically hazards,
radioactive material.
Top – falling of unwanted material, stability of roof
or structure, splashing.
Bottom-Stability, slip and trip, Unwanted and non-
specified
item to whom person may stand.
Job hazards, work knowledge, not use of safety
appliances may cause of injury, accident and
damage of property Unawareness of safety rules.

1. Discussion of SOP
2.Discuss the six directional hazards.
3.Discuss the safety Performance.

a.Weak plate forms & handrail.


b.Falling hazard due to weak staircase.
c.Damage staircase

a. Falling hazard due to weak platform.


b. Unhealthy handrail.
c. Weak staircase & structure

a. Falling hazard due to weak platform.


b. Unhealthy handrail.
c. Weak staircase & structure.
a. Weak plate form.
b. Un healthy handrails.
c. Weak staircase

Gas Hazard, Entrapment ,Heat, Oxgen


Deficiency,low illumuniation inside charging
device/Blowing Device

REQUIRED TOOLS AND EQUIPMENTS

Fire protection.- water bucket, ceramic cloth, Fire


extinguisher – ABC type.

PPEs - Use all PPEs(Safety Shoes, Helmet, Safety,


goggles, Shin Guard) while loading and unloading
the tools and tackles

Prepared By
REV#00
iRISE INDIA PVT.LTD
JHA (JOB HAZARD ANALYS

Device

SAFEGUARD/CONTROL TO BE PU
Safety Induction training at Plot-2 & specialized training by Safety & Ergonomics dept. w
the job. Daily tools kit meeting/tool box talk/ safety induction will be given to workmen
have clearly understood the job related hazards & its preventive measures half hour sa
completion of work for good housekeeping and safe condition of site.
Hazards will be identified/Permit to work must be assessed before to start work. All pro
made known to workmen & other concerned persons.
Working clearance/Permit to work must be taken duly signed by concerned persons be
unwritten on procedures & need to be performed.
All staff and workmen will be made aware about all road safety norms.All kinds of Stan
to workman like safety shoes, safety helmet, hand gloves, safety goggles, Face shield a
height etc. All Engineers/Supervisors and workmen will be ensured aware about job re
All hazards/precaution will be briefed to workmen before to starting the job. All workm
cards and gate passes.Adequate illumination (more than 75 Lux) will be ensured during
required.
Medically fit & height trained persons will only be allowed to work at height. Full body
standard life line.
No job shall be executed in absence of Supervisor /Safety Supervisor. Housekeeping wi
in order. Disposal of scrap to the designated place.
First Aid box valid with medicine and Fire extinguishers will be kept ready at all promin
Red lamp, Foreman with whistle, safety steward, display/caution boards etc. will be pro
Materials related to job must be kept at site systematically * as per TPM check list)
Safety Induction training at Plot-2 & specialized training by Safety & Ergonomics dept. w
the job. Daily tools kit meeting/tool box talk/ safety induction will be given to workmen
have clearly understood the job related hazards & its preventive measures half hour sa
completion of work for good housekeeping and safe condition of site.
Hazards will be identified/Permit to work must be assessed before to start work. All pro
made known to workmen & other concerned persons.
Working clearance/Permit to work must be taken duly signed by concerned persons be
unwritten on procedures & need to be performed.
All staff and workmen will be made aware about all road safety norms.All kinds of Stan
to workman like safety shoes, safety helmet, hand gloves, safety goggles, Face shield a
height etc. All Engineers/Supervisors and workmen will be ensured aware about job re
All hazards/precaution will be briefed to workmen before to starting the job. All workm
cards and gate passes.Adequate illumination (more than 75 Lux) will be ensured during
required.
Medically fit & height trained persons will only be allowed to work at height. Full body
standard life line.
No job shall be executed in absence of Supervisor /Safety Supervisor. Housekeeping wi
in order. Disposal of scrap to the designated place.
First Aid box valid with medicine and Fire extinguishers will be kept ready at all promin
Red lamp, Foreman with whistle, safety steward, display/caution boards etc. will be pro
Materials related to job must be kept at site systematically * as per TPM check list)

First of all go to the working site and identified the six directional hazards.
Fill up the back side of the work permit form no- HMC- PRO/GEN/4003 and its mitigatio

The concern department /contractor supervisor Explain the identified hazard and its co
Training of SOP to all working person.
Working labor must know the use of safety appliances. Following minimum things are i
People will never wear loose clothes. Cotton garments to be used.
Good condition TSL standard PPE to be used properly. People know about the emergen
People know about the rescue operation during emergency. Before starting the job join
Contractor’s supervisor to make a safe plan to execute the job safely & ground reality t

Fill the TBM form and Note Down the discussion points

a. Cleaning dust from gate 1,2,& 3 at 4.5 meter level from out side.
b. Cleaning of gate no 4,5& 6 above ground floor.

a. Remove of Plummer block cover & cleaning.


b. Bearing condition checking and replacement if need.
c. Greasing of bearing with grease

a. Opening of round man holes


b. Checking of gates proper sheeting.
c. Repairing of Gates if required.
d. Silicon rubber replacement for gate 3&4.
e. Box up gates & round man holes
a. Gland packing fixing in gate no 1& 2 and gland bolts lighting.
b. Checking of all bolts.
c. Return of all work permit after completion of job

Remove all persons and scrap etc. made the area clean from site before returning the c
Work permit to be returned using standard format to authorized person.
If power getting is required, after removing the positive isolation lock, raise the power

REQUIRED TRAINING

SOP, FIRE SAFETY,ROAD SAFETY RULE, IPAF TRAINING,WORKING


EFF DATE: 01/04/2021

RESPONSIBILITY

SAFETY OFFICER&SITE ENGINEER


SAFETY OFFICER&SITE ENGINEER

SAFETY OFFICER&SITE ENGINEER


SAFETY OFFICER&SITE ENGINEER

SAFETY OFFICER&SITE ENGINEER

SAFETY OFFICER&SITE ENGINEER

SAFETY OFFICER&SITE ENGINEER


SAFETY OFFICER&SITE ENGINEER

SAFETY OFFICER&SITE ENGINEER

SPECIAL SKILLED EMPLOYEES