FOOTBAL PITCH INSTALLATION.

JOB SAFETY ANALYSIS


Rev. 1 Status IFA
DOCUMENT NO: CPP-JSA-008
Page: 1 of 4

SEQUENCE OF POTENTIAL CONTROL MEASURES ACTION BY


BASIC STEPS HAZARD/S
1 Work Site  No proper work permit  Issuer and Receiver shall conduct Joint Site Inspection prior to any work activities. Permit Issuer
Preparation  Exposure to toxic or  Shall list and correct all the additional precautions prior to work. Engineer/Crew
H2S Gas Release  Obtain adequate work permit. members
 Traffic hazards  Approved method statement to be available on site. Site Safety
 Injury to personnel  Emergency Response Plan/Procedure shall be brief and followed by CPP personnel. Officers.
 Vehicle mishap  Appropriate hand tools shall be used.
 Property damaged  Ensure of using all the required PPE including safety shoes, safety glass, safety
 Slip, trip & fall hazards helmet, safety gloves and Fire Resistant Clothing.
 Fall of  TBT shall be conducted and topic manuscript shall be available with attendance sheet.
personnel/equipment  Install appropriate barricades and warning sign; shall be posted around the work site to
 Inappropriate sequence minimize the number of personnel in the work area while performing the activity.
of work  All tools or equipment’s shall be properly inspected, correct and in good condition
 lack of competency with present month colour code.
 Noise  Maintain housekeeping practices by removing unwanted trash as well as good
 Miss communication / arrangement of tools and equipment’s
Understanding  Vehicle shall be parked at the designated parking area only.
 No Hazards  It shall not be parked nearby any construction equipment and/or existing facilities.
Identification /  An emergency vehicle shall be available at location full time.
Inspections  Ensure that walkways and all access points shall be clear & identified in the work area.
 Existing facility nearby shall be protected and distance shall be maintained
 Trained and certified flagman shall be provided if required.
 Noise signage shall be posted in the area to remind people using ear protection
equipments.
 Ensure health condition of operator, flagman and involved employees.
 Proper shelter including umbrella shall be provided.
 First aid kit shall be available at site at least in the car.
2 Mobilization of  Injury to personnel.  Assign trained spotter to assist and monitor the personnel Engineer/
Equipment  Vehicle mishap  Competent and certified operator with licenses are allowed to work at site Supervisor &
 Property damage  Provide adequate safety signage along ROW, including crossing and affected area Safety Officers
 Striking the existing  All tools or equipment to be properly inspected, colour coded and maintain in good
facilities condition.
 Improper loading /  Equipment should be barricaded to avoid damage
unloading of equipment  Installation of warning signs to warn the operator of the hazard of overhead power line
and materials  Install warning sign caution overhead power line / cable on both sides
 Equipment failure  Assign certified rigger to rig all loads and materials
FOOTBAL PITCH INSTALLATION.

JOB SAFETY ANALYSIS


Rev. 1 Status IFA
DOCUMENT NO: CPP-JSA-008
Page: 2 of 4

SEQUENCE OF POTENTIAL CONTROL MEASURES ACTION BY


BASIC STEPS HAZARD/S
 Operator or riggers  Equipment’s inspection to be taken prior to mobilisation to site.
failure/Error  Operator and rigger shall be competent and as per EACOP requirement’s.

 struck by vehicle/  Trained spotter shall be assign with reflective vest


trailer/ heavy  All drivers and pedestrians shall know and understand the routes and traffic rules in
equipment site by training.
 Standard road signs to give direction and speed limit where appropriate.
Foreman/Crew
3. Excavation,Levelling,  Struck by Excavator,  Pre-job meeting to be carried out for communication of control measures members &
Back-filling and fronted loader, dump truck,  Only designated and qualified operator is permitted to use the machine (proof of training to Safety
Compaction Grader, Roller Bulldozer, operate the machine to be always retained with operator). officer,Enviro
Works. compactor machine during  Area allocation for each equipment to avoid collision & safe execution n mental
site activity.  Flag man (with high VIZ reflective vest) shall be safe distance away from the operating officer
machine at start up and the entire operation to be kept away from the Line of Fire and observe
the Life Saving Rule.(LSR)
 Provide specific training to Flag man and operator together
 Never pass in front of the machine during the operation until the operation is completely
stopped (engine to be shut-down).
 Do not allow personnel under the raised bucket.
 Using visual and audible methods to communicate between the flagman and the operator, if
required (walkie-talkie, hand signals, flag)
 Place persons/spotters to keep community persons away and the safe distance rule are
enforced from the perimeter boundary area.
 Provide warning signs in Swahili/English/Chinese.
 Water sprinkling to minimize dust suppression
 Use of dust mask
 Provided ear plug to the worker
 Equipment will be maintained and services as required
 Strictly follow working schedule no night shift working
 Noise, vibration
& Dust.  Ensure Noise monitoring as per set frequency & marking of high noise area
 Provide warning signs in Swahili/English/Chinese
 Provide rest and rotate workers
 Select low vibration tools and equipment such as anti-vibration.

4. Torf  Non- observance of  Personnel shall be trained on proper manual material handling techniques. Engineer/Crew
installation,irrigatio personnel on proper Demonstrate how to do safe manual lifting members &
n ,rolling and techniques in manual  Wear proper hand protection gloves. CPP and
FOOTBAL PITCH INSTALLATION.

JOB SAFETY ANALYSIS


Rev. 1 Status IFA
DOCUMENT NO: CPP-JSA-008
Page: 3 of 4

SEQUENCE OF POTENTIAL CONTROL MEASURES ACTION BY


BASIC STEPS HAZARD/S
compaction. handling materials.  Good housekeeping and material management Safety Officers
 Over exertion  Appropriate PPE shall be equipped with all involved personnel.
 Back pain/ injury  Ergonomics procedure shall be implemented.
 Cumulative trauma  Eliminate trip, slip & fall hazards
disorder
 Improper stockpiling
 Falls, Slip & trip
 Dust inhalation
 Eye irritation

5. Electrical poles and  Personnel injuries  Appropriate PPE shall be worn


goal post  Falling objects  Keep access free from any obstruction.
installation.  Back injury  Provide protection on all sharp or pointed objects.
 Hand injury  Maintain proper house keeping
 Pinch point  Only approved and inspected tools are to be used
 Ingress of moisture or  Work area to be barricaded and only authorized personnel are allowed to enter.
dust  Hand tools to be secured by rope.
 Congested area  Ensure all workers involved shall undergo safety orientation/ toolbox talk prior
 No safety orientation/ to start the work.
toolbox talk  Ensure all workers involved are trained and experienced to execute hazardous
 Unskilled/ electrical works.
unexperienced  Appropriate tools and lifting equipment shall only be used during the working
electrical technicians process.
 Inappropriate tools  Ensure enough working space and safe from equipment’s movement.
 Struck by equipment/  Ensure all electrical operated tools are free from any wiring defects and nearby
load power sources are properly guarded.
 Electrical shocks  All tools and equipment shall be inspected and in good operating condition prior
 Cuts and abrasion to put into operation.
injury due to sharp  All sharp edge/ protruding object shall be protected.
edges and non-usage  All tools and materials shall be placed out of pathways.
of suitable PPE.
 Slip, Tripping
hazards.
FOOTBAL PITCH INSTALLATION.

JOB SAFETY ANALYSIS


Rev. 1 Status IFA
DOCUMENT NO: CPP-JSA-008
Page: 4 of 4

No Recommendations / Notes Assigned to Position


1 Conduct tool box safety meeting prior to commence of work activities every day CPP Safety Supervisor / Forman
2 Explain to the key workers the purpose of this JSA and enforce implementation of content CPP HSESupervisor / Forman
3 Use the JSA to identify the hazards and list the precautions on the work CPP HSE Supervisor / Forman
4 Lifting and Lowering Materials to be part of separate JSA CPP Rigger / HSE
CPP HSE team
Emergence
 If near miss occurs, conduct a toolbox talk, and inform CPP HSE Manager. and prepare a near miss
response team
report HSE Manager / ERT team
5 HSE Manager
 If an injury occurs, stop activities for the time being, call an emergency to provide First Aid and then after &HSE Team on site.
and
clearance resume activities
Construction
Manager
Emergence Response Team
In case of an emergency call CPP HSE Supervisors /Emergence Response Team
NAMES OF ERT TEAM……………………… Cotacts ………….

JSA Prepared By: Checked & Reviewed By: Approved By:

Name: ………… Name: …………………………………………. Name: .


HSE Supervisor HSE Manager Field Compliance Coordinator
Date: Date: Date:

Signature: Signature: Signature: