Professional Documents
Culture Documents
METHOD STATEMENT
Content Page No
1) Introduction 4
2) Scope 4
3) Responsibilities 4
4) Equipment 4
5) Procedure 5
6) Safety Measures 5
7) Risk Assessment 6
8) ITP 6
9) Risk Matrix 7
METHOD STATEMENT FOR
ANTI-TERMITE TREATMENT WORKS
1. INTRODUCTION
As per the contract, it is proposed to Construct the package of Now You See
Me Street Main - in the project Motiongate Expansion at Dubai Parks and
Resorts, Dubai, UAE.
Anti-termite treatment
3. RESPONSIBILITIES
3.1. The Site Engineer shall be responsible for ensuring that all works are carried out
strictly in accordance with this Method Statement, the requirements of the client
and the overall contract documents.
3.2. The Site Engineer to ensure that all the works are carried out strictly in accordance
with safety norms.
6. SAFETY MEASURES
Dizziness,
Respiratory 1.Chemical to be used as per JAFZA norms.
1 Inhalations of Poison Arrest and 2 2 4 Medium 2. All personnel at site fully using safety gears, like immediate
Rise in Blood certified chemical masks and helmet.
Pressure.
Skin Allergy, irritated & Using the chemical resistant gloves, safety rubber
2 Chemical Contact with skin & eye 1 2 2 Low immediate
Watery eyes, sneezing, etc. boots, industrial protection goggles, etc.
8. ITP
Preparation of relevant drawings and Project manager, Approved for construction All documents approved or Method Statement,
Review of documents DS
1.1 method statement, Inspection and QA/QC Eng. drawings/ approved as noted. drawings, HSE plan &
Test Plan, HSE procedure. HSE officer Project Specifications Comments – Incorporate and ITP approval
Proceed with works
Project Manager,
All documents to be
Approval for : QA/QC
Project Specifications approved as noted. Prequalification DS
1.2 Engineer Review of documents
Comments – Incorporate and documents.
1. Antitermite supplier/subcontractor. (with supplier/
Proceed with works
subcontractor)
All Submittals to be
Project Specifications approved as noted. Product data through
2.1 Materials submittal and approval. Site Engineer Review of documents
Comments – Incorporate and submittal review DS
Proceed with works
9. RISK MATRIX