PT. CIPTA BANGUN NUSANTARA WELDING TRACEBILITY REPORT STAR ENERGY GEOTHERMAL (WAYANG WINDU) LTD.

Project : MBE-6 PRODUCTION PIPING HOOK UP


Line Inspected : 18" T3-17-1761 TH BRANCH LINE Report no. : 01/FVWIR-MBE-6/CBN/2021
Contractor : PT. CIPTA BANGUN NUSANTARA Sheet no. : 1 OF 11
Client : STAR ENERGY GEOTHERMAL (WAYANG WINDU) LTD. Date :
Acceptance Criteria : ASME B31.1-2020 Area : MBE-6

JOINT BASE METAL MATERIAL WELDING CONSUMABLE MATERIAL VISUAL INSPECTION NON DESTRUCTIVE TEST (NDT)
WPS
SHOP/
NO FIELD Fit-Up Welding PT UT RT (INITIAL) RT (Rep 1) RT (Rep 2) REMARK
Dia.
No Type Description Specification Size / Thk Heat No. Brand AWS Class (mm) LOT No. Brand Report No.
No. Process Date Result Date Seq Welder ID Result DATE REPORT RESULT DATE REPORT RESULT DATE REPORT RESULT DATE REPORT RESULT DATE REPORT RESULT

MBE-6 18" T3-17-1761 TH BRANCH LINE (Drawing No: W1902-17-ME-DRG-1011 )

TP316/316L E200657. 006/


FLANGE 1" Sch 40 GALPERTI
WPS/ SW#600 RF A 01/FVWIR- PT/
Fillet AWS
1 80 SHOP ASME/ GTAW 2.4 20129 BOHLER 2-Jul ACC 12-Jul F/C CBN-06 ACC MBE-6/ 24/07/21 SEGWW ACC N/R N/R N/R N/R
Weld A5.18
WP004 CBN/2021 /BIT/
PIPE NIPPLE TP316/316L 1 x 4" Sch 80 559445 SANDVIK VII/21

PIPE NIPPLE TP316/316L 1 x 4" Sch 80 559445 SANDVIK 006/


WPS/ 01/FVWIR- PT/
Fillet AWS
2 81 SHOP ASME/ GTAW 2.4 20129 BOHLER 2-Jul ACC 12-Jul F/C CBN-06 ACC MBE-6/ 24/07/21 SEGWW ACC N/R N/R N/R N/R
Weld A5.18
WP004 CBN/2021 /BIT/
VALVE TP316/316L 1" #800 R71L FVB VII/21

PIPE NIPPLE TP316/316L 1 x 4" Sch 80 559445 SANDVIK 006/


WPS/ 01/FVWIR- PT/
Fillet AWS
3 82 SHOP ASME/ GTAW 2.4 20129 BOHLER 2-Jul ACC 12-Jul F/C CBN-06 ACC MBE-6/ 24/07/21 SEGWW ACC N/R N/R N/R N/R
Weld A5.18
WP004 CBN/2021 /BIT/
VALVE TP316/316L 1" #800 R71L FVB VII/21

Prepared by Reviewed by
Reviewed by Approved by

PT. CIPTA BANGUN NUSANTARA PT. CIPTA BANGUN NUSANTARA


STAR ENERGY GEOTHERMAL (WAYANG WINDU) Ltd. STAR ENERGY GEOTHERMAL (WAYANG WINDU) Ltd.

( M HIFNI SYAHBANA ) ( RICKY FIRMANSYAH ) ( ) ( )


PT. CIPTA BANGUN NUSANTARA WELDING TRACEBILITY REPORT STAR ENERGY GEOTHERMAL (WAYANG WINDU) LTD.

Project : MBE-6 PRODUCTION PIPING HOOK UP


Line Inspected : 18" T3-17-1761 TH BRANCH LINE Report no. : 01/FVWIR-MBE-6/CBN/2021
Contractor : PT. CIPTA BANGUN NUSANTARA Sheet no. : 1 OF 11
Client : STAR ENERGY GEOTHERMAL (WAYANG WINDU) LTD. Date :
Acceptance Criteria : ASME B31.1-2020 Area : MBE-6

JOINT BASE METAL MATERIAL WELDING CONSUMABLE MATERIAL VISUAL INSPECTION NON DESTRUCTIVE TEST (NDT)
WPS
SHOP/
NO FIELD Fit-Up Welding PT UT RT (INITIAL) RT (Rep 1) RT (Rep 2) REMARK
Dia.
No Type Description Specification Size / Thk Heat No. Brand AWS Class (mm) LOT No. Brand Report No.
No. Process Date Result Date Seq Welder ID Result DATE REPORT RESULT DATE REPORT RESULT DATE REPORT RESULT DATE REPORT RESULT DATE REPORT RESULT

MBE-6 18" T3-17-1761 TH BRANCH LINE (Drawing No: W1902-17-ME-DRG-1011 )

PIPE NIPPLE TP316/316L PBE 1" Sch 80 AENM MEGA 010/


WPS/ 01/FVWIR- PT/
Fillet AWS
1 72 SHOP ASME/ GTAW 2.4 20129 BOHLER 2-Jul ACC 12-Jul F/C CBN-06 ACC MBE-6/ 24/07/21 SEGWW ACC N/R N/R N/R N/R
Weld A5.18
WP004 TP316/316L CBN/2021 /BIT/
FLANGE 1" Sch 40 E190914.A GALPERTI VII/21
SW#600 RF

PIPE NIPPLE TP316/316L PBE 1" Sch 80 AENM MEGA 010/


WPS/ 01/FVWIR- PT/
Fillet AWS
2 73 SHOP ASME/ GTAW 2.4 20129 BOHLER 2-Jul ACC 12-Jul F/C CBN-06 ACC MBE-6/ 24/07/21 SEGWW ACC N/R N/R N/R N/R
Weld A5.18
WP004 CBN/2021 /BIT/
VALVE TP316/316L 1" #800 R71L FVB VII/21

TP316/316L PBE TUBOS 010/


PIPE NIPPLE TOE 1" Sch 80 122614 REUNIDOS
WPS/ 01/FVWIR- PT/
Fillet AWS
3 74 SHOP ASME/ GTAW 2.4 20129 BOHLER 2-Jul ACC 12-Jul F/C CBN-06 ACC MBE-6/ 24/07/21 SEGWW ACC N/R N/R N/R N/R
Weld A5.18
WP004 CBN/2021 /BIT/
VALVE TP316/316L 1" #800 R71L FVB VII/21

TP316/316L PBE TUBOS


PIPE NIPPLE 1" Sch 80 122614
TOE REUNIDOS
4 75 THREADED THREADED

VALVE TP316/316L 1" NPT L20 GTA

VALVE TP316/316L 1" NPT L20 GTA

5 76 THREADED THREADED

BUSHING ASTM A182 H 1 x 1/2" HEX HEAD YBFN MEGA

AWS 006/
GTAW PIPE API 5L Gr. B 18" Sch 40 (14,27) 315783 TPCO 2.4 21010 BOHLER
WPS/ A5.18 01/FVWIR- PT/
Fillet
6 77 FIELD ASME/ 12-Jul ACC 14-Jul F/C CBN-015 ACC MBE-6/ 24/07/21 SEGWW ACC N/R N/R N/R N/R
Weld
WP006 AWS CBN/2021 /BIT/
SMAW SOCKOLET ASTM A105N #6000 1 x 1 1/4" Sch 80 AEKN MEGA 3.2 21613 BOHLER VII/21
A5.1

SOCKOLET ASTM A105N #6000 1 x 1 1/4" Sch 80 AEKN MEGA 006/


WPS/ 01/FVWIR- PT/
Fillet AWS
7 78 SHOP ASME/ GTAW 2.4 20116 BOHLER 2-Jul ACC 12-Jul F/C CBN-06 ACC MBE-6/ 24/07/21 SEGWW ACC N/R N/R N/R N/R
Weld A5.18
WP005 CBN/2021 /BIT/
PIPE NIPPLE TP316/316L 1 x 4" Sch 80 559445 SANDVIK VII/21

PIPE NIPPLE TP316/316L 1 x 4" Sch 80 559445 SANDVIK 006/


WPS/ 01/FVWIR- PT/
Fillet AWS
8 79 SHOP ASME/ GTAW 2.4 20129 BOHLER 2-Jul ACC 12-Jul F/C CBN-06 ACC MBE-6/ 24/07/21 SEGWW ACC N/R N/R N/R N/R
Weld A5.18
WP004 TP316/316L E150373. CBN/2021 /BIT/
FLANGE 1" Sch 40 GALPERTI VII/21
SW#600 RF A

Prepared by Reviewed by
Reviewed by Approved by

PT. CIPTA BANGUN NUSANTARA PT. CIPTA BANGUN NUSANTARA


STAR ENERGY GEOTHERMAL (WAYANG WINDU) Ltd. STAR ENERGY GEOTHERMAL (WAYANG WINDU) Ltd.

( M HIFNI SYAHBANA ) ( RICKY FIRMANSYAH ) ( ) ( )


PT. CIPTA BANGUN NUSANTARA WELDING TRACEBILITY REPORT STAR ENERGY GEOTHERMAL (WAYANG WINDU) LTD.

Project : MBE-6 PRODUCTION PIPING HOOK UP


Line Inspected : 18" T3-17-1761 TH BRANCH LINE Report no. : 01/FVWIR-MBE-6/CBN/2021
Contractor : PT. CIPTA BANGUN NUSANTARA Sheet no. : 1 OF 11
Client : STAR ENERGY GEOTHERMAL (WAYANG WINDU) LTD. Date :
Acceptance Criteria : ASME B31.1-2020 Area : MBE-6

JOINT BASE METAL MATERIAL WELDING CONSUMABLE MATERIAL VISUAL INSPECTION NON DESTRUCTIVE TEST (NDT)
WPS
SHOP/
NO FIELD Fit-Up Welding PT UT RT (INITIAL) RT (Rep 1) RT (Rep 2) REMARK
Dia.
No Type Description Specification Size / Thk Heat No. Brand AWS Class (mm) LOT No. Brand Report No.
No. Process Date Result Date Seq Welder ID Result DATE REPORT RESULT DATE REPORT RESULT DATE REPORT RESULT DATE REPORT RESULT DATE REPORT RESULT

MBE-6 18" T3-17-1761 TH BRANCH LINE (Drawing No: W1902-17-ME-DRG-1011 )

PIPE NIPPLE TP316/316L PBE 1" Sch 80 AENM MEGA 010/


WPS/ 01/FVWIR- PT/
Fillet AWS
1 64 SHOP ASME/ GTAW 2.4 20129 BOHLER 2-Jul ACC 7-Jul F/C CBN-06 ACC MBE-6/ 24/07/21 SEGWW ACC N/R N/R N/R N/R
Weld A5.18
WP004 TP316/316L CBN/2021 /BIT/
FLANGE 1" Sch 40 E190914.A GALPERTI VII/21
SW#600 RF

PIPE NIPPLE TP316/316L PBE 1" Sch 80 AENM MEGA 010/


WPS/ 01/FVWIR- PT/
Fillet AWS
2 65 SHOP ASME/ GTAW 2.4 20129 BOHLER 2-Jul ACC 7-Jul F/C CBN-06 ACC MBE-6/ 24/07/21 SEGWW ACC N/R N/R N/R N/R
Weld A5.18
WP004 CBN/2021 /BIT/
VALVE TP316/316L 1" #800 R71L FVB VII/21

TP316/316L PBE TUBOS 010/


PIPE NIPPLE TOE 1" Sch 80 122614 REUNIDOS
WPS/ 01/FVWIR- PT/
Fillet AWS
3 66 SHOP ASME/ GTAW 2.4 20129 BOHLER 2-Jul ACC 7-Jul F/C CBN-06 ACC MBE-6/ 24/07/21 SEGWW ACC N/R N/R N/R N/R
Weld A5.18
WP004 CBN/2021 /BIT/
VALVE TP316/316L 1" #800 R71L FVB VII/21

TP316/316L PBE TUBOS


PIPE NIPPLE 1" Sch 80 122614
TOE REUNIDOS
4 67 THREADED THREADED

VALVE TP316/316L 1" NPT L20 GTA

VALVE TP316/316L 1" NPT L20 GTA

5 68 THREADED THREADED

BUSHING ASTM A182 H 1 x 1/2" HEX HEAD YBFN MEGA

AWS 010/
GTAW SOCKOLET ASTM A105N #6000 1 x 1.1/4" Sch 80 AEKN MEGA 2.4 21010 BOHLER
WPS/ A5.18 01/FVWIR- PT/
Fillet
6 69 FIELD ASME/ 12-Jul ACC 14-Jul F/C CBN-015 ACC MBE-6/ 24/07/21 SEGWW ACC N/R N/R N/R N/R
Weld
WP002 AWS CBN/2021 /BIT/
SMAW PIPE API 5L Gr. B 18" Sch 40 (14,27) 315783 TPCO 3.2 21613 BOHLER VII/21
A5.1

SOCKOLET ASTM A105N #6000 1 x 1.1/4" Sch 80 AEKN MEGA 010/


WPS/ 01/FVWIR- PT/
Fillet AWS
7 70 SHOP ASME/ GTAW 2.4 20116 BOHLER 2-Jul ACC 12-Jul F/C CBN-015 ACC MBE-6/ 24/07/21 SEGWW ACC N/R N/R N/R N/R
Weld A5.18
WP005 CBN/2021 /BIT/
PIPE NIPPLE TP316/316L PBE 1" Sch 80 AENM MEGA VII/21

PIPE NIPPLE TP316/316L PBE 1" Sch 80 AENM MEGA 010/


WPS/ 01/FVWIR- PT/
Fillet AWS
8 71 SHOP ASME/ GTAW 2.4 20129 BOHLER 2-Jul ACC 12-Jul F/C CBN-06 ACC MBE-6/ 24/07/21 SEGWW ACC N/R N/R N/R N/R
Weld A5.18
WP004 TP316/316L E200657. CBN/2021 /BIT/
FLANGE 1" Sch 40 GALPERTI VII/21
SW#600 RF A

Prepared by Reviewed by
Reviewed by Approved by

PT. CIPTA BANGUN NUSANTARA PT. CIPTA BANGUN NUSANTARA


STAR ENERGY GEOTHERMAL (WAYANG WINDU) Ltd. STAR ENERGY GEOTHERMAL (WAYANG WINDU) Ltd.

( M HIFNI SYAHBANA ) ( RICKY FIRMANSYAH ) ( ) ( )


PT. CIPTA BANGUN NUSANTARA WELDING TRACEBILITY REPORT STAR ENERGY GEOTHERMAL (WAYANG WINDU) LTD.

Project : MBE-6 PRODUCTION PIPING HOOK UP


Line Inspected : 18" T3-17-1761 TH BRANCH LINE Report no. : 01/FVWIR-MBE-6/CBN/2021
Contractor : PT. CIPTA BANGUN NUSANTARA Sheet no. : 1 OF 11
Client : STAR ENERGY GEOTHERMAL (WAYANG WINDU) LTD. Date :
Acceptance Criteria : ASME B31.1-2020 Area : MBE-6

JOINT BASE METAL MATERIAL WELDING CONSUMABLE MATERIAL VISUAL INSPECTION NON DESTRUCTIVE TEST (NDT)
WPS
SHOP/
NO FIELD Fit-Up Welding PT UT RT (INITIAL) RT (Rep 1) RT (Rep 2) REMARK
Dia.
No Type Description Specification Size / Thk Heat No. Brand AWS Class (mm) LOT No. Brand Report No.
No. Process Date Result Date Seq Welder ID Result DATE REPORT RESULT DATE REPORT RESULT DATE REPORT RESULT DATE REPORT RESULT DATE REPORT RESULT

MBE-6 18" T3-17-1761 TH BRANCH LINE (Drawing No: W1902-17-ME-DRG-1011 )

SOCKOLET ASTM A105N #6000 3/4 x 1 " Sch 80 ANGK MEGA 007/
WPS/ 01/FVWIR-
Fillet AWS PT/BIT-
1 56 SHOP ASME/ GTAW 2.4 20116 BOHLER 2-Jul ACC 12-Jul F/C CBN-015 ACC MBE-6/ 24/07/21 ACC N/R N/R N/R N/R
Weld A5.18 SEGWW
WP005 3/4" x 100 mm Sch NIPPON CBN/2021
PIPE NIPPLE TP316/316L F021027 /VII/21
80 STEEL

3/4" x 100 mm Sch NIPPON


PIPE NIPPLE TP316/316L F021027 007/
WPS/ 80 STEEL 01/FVWIR-
Fillet AWS PT/BIT-
2 57 SHOP ASME/ GTAW 2.4 20129 BOHLER 2-Jul ACC 12-Jul F/C CBN-06 ACC MBE-6/ 24/07/21 ACC N/R N/R N/R N/R
Weld A5.18 SEGWW
WP004 TP316/316L #600 CBN/2021
FLANGE 3/4" Sch 80 GALPERTI /VII/21
RF 473983

TP316/316L
FLANGE SW#600 RF 3/4" Sch 80 473983 GALPERTI 007/
WPS/ 01/FVWIR-
Fillet AWS PT/BIT-
3 58 SHOP ASME/ GTAW 2.4 20129 BOHLER 2-Jul ACC 12-Jul F/C CBN-06 ACC MBE-6/ 24/07/21 ACC N/R N/R N/R N/R
Weld A5.18 SEGWW
WP004 3/4" x 100 mm Sch NIPPON CBN/2021
PIPE NIPPLE TP316/316L F021027 /VII/21
80 STEEL

3/4" x 100 mm Sch NIPPON


PIPE NIPPLE TP316/316L F021027 007/
WPS/ 80 STEEL 01/FVWIR-
Fillet ASME/ AWS MBE-6/ PT/BIT-
4 59 Weld SHOP GTAW A5.18 2.4 20129 BOHLER 2-Jul ACC 12-Jul F/C CBN-06 ACC 24/07/21 SEGWW ACC N/R N/R N/R N/R
WP004 CBN/2021
VALVE TP316/316L 3/4" #800 FVB /VII/21
B27

VALVE TP316/316L 3/4" #800 B27 FVB 007/


WPS/ 01/FVWIR-
Fillet AWS PT/BIT-
5 60 SHOP ASME/ GTAW 2.4 20129 BOHLER 2-Jul ACC 12-Jul F/C CBN-06 ACC MBE-6/ 24/07/21 ACC N/R N/R N/R N/R
Weld A5.18 SEGWW
WP004 3/4" x 100 mm Sch CBN/2021
PIPE NIPPLE TP316/316L 509975 SANYO /VII/21
80

AWS 010/
GTAW SOCKOLET ASTM A105N #6000 1 x 1.1/4" Sch 80 AEKN MEGA 2.4 21010 BOHLER
WPS/ A5.18 01/FVWIR- PT/
Fillet
6 61 FIELD ASME/ 12-Jul ACC 14-Jul F/C CBN-015 ACC MBE-6/ 24/07/21 SEGWW ACC N/R N/R N/R N/R
Weld
WP002 AWS CBN/2021 /BIT/
SMAW PIPE API 5L Gr. B 18" Sch 40 (14,27) 315783 TPCO 3.2 21613 BOHLER VII/21
A5.1

SOCKOLET ASTM A105N #6000 1 x 1.1/4" Sch 80 AEKN MEGA 010/


WPS/ 01/FVWIR- PT/
Fillet AWS
7 62 SHOP ASME/ GTAW 2.4 20116 BOHLER 30-Jun ACC 7-Jul F/C CBN-015 ACC MBE-6/ 24/07/21 SEGWW ACC N/R N/R N/R N/R
Weld A5.18
WP005 CBN/2021 /BIT/
PIPE NIPPLE TP316/316L PBE 1" Sch 80 AENM MEGA VII/21

PIPE NIPPLE TP316/316L PBE 1" Sch 80 AENM MEGA 010/


WPS/ 01/FVWIR- PT/
Fillet AWS
8 63 SHOP ASME/ GTAW 2.4 20129 BOHLER 2-Jul ACC 7-Jul F/C CBN-06 ACC MBE-6/ 24/07/21 SEGWW ACC N/R N/R N/R N/R
Weld A5.18
WP004 TP316/316L E200657. CBN/2021 /BIT/
FLANGE 1" Sch 40 GALPERTI VII/21
SW#600 RF A

Prepared by Reviewed by
Reviewed by Approved by

PT. CIPTA BANGUN NUSANTARA PT. CIPTA BANGUN NUSANTARA


STAR ENERGY GEOTHERMAL (WAYANG WINDU) Ltd. STAR ENERGY GEOTHERMAL (WAYANG WINDU) Ltd.

( M HIFNI SYAHBANA ) ( RICKY FIRMANSYAH ) ( ) ( )


PT. CIPTA BANGUN NUSANTARA WELDING TRACEBILITY REPORT STAR ENERGY GEOTHERMAL (WAYANG WINDU) LTD.

Project : MBE-6 PRODUCTION PIPING HOOK UP


Line Inspected : 18" T3-17-1761 TH BRANCH LINE Report no. : 01/FVWIR-MBE-6/CBN/2021
Contractor : PT. CIPTA BANGUN NUSANTARA Sheet no. : 1 OF 11
Client : STAR ENERGY GEOTHERMAL (WAYANG WINDU) LTD. Date :
Acceptance Criteria : ASME B31.1-2020 Area : MBE-6

JOINT BASE METAL MATERIAL WELDING CONSUMABLE MATERIAL VISUAL INSPECTION NON DESTRUCTIVE TEST (NDT)
WPS
SHOP/
NO FIELD Fit-Up Welding PT UT RT (INITIAL) RT (Rep 1) RT (Rep 2) REMARK
Dia.
No Type Description Specification Size / Thk Heat No. Brand AWS Class (mm) LOT No. Brand Report No.
No. Process Date Result Date Seq Welder ID Result DATE REPORT RESULT DATE REPORT RESULT DATE REPORT RESULT DATE REPORT RESULT DATE REPORT RESULT

MBE-6 18" T3-17-1761 TH BRANCH LINE (Drawing No: W1902-17-ME-DRG-1011 )

AWS
GTAW ELBOW 45 ASTM A234 Gr.WPB 18" Sch 40 (14,27) 963M32Y AWAJI 2.4 19131 BOHLER 56/RT/
WPS/ A5.18 01/FVWIR-
Butt R/H/ BIT-
1 49 SHOP ASME/ 8-Jul ACC 9-Jul CBN-015 ACC MBE-6/ N/R N/R 17/07/21 ACC N/R N/R
Weld F/C SEGWW
WP002 18" AWS CBN/2021
SMAW FLANGE ASME A105 RTJ HYUNDAE 3.2 21312 BOHLER /VII/21
WN/RTJ #600 P57349 A5.1
FITINGS

AWS
GTAW FLANGE ASME A105 RTJ 12" Sch 40 94330 ITALY 2.4 19131 BOHLER 06/RT/
WPS/ A5.18 01/FVWIR-
Butt R/H/ BIT-
2 50 SHOP ASME/ 4-May ACC 22-May CBN-015 ACC MBE-6/ N/R N/R 29/06/21 ACC N/R N/R
Weld F/C SEGWW
WP002 AWS CBN/2021
SMAW PIPE API 5L Gr. B 18" Sch 40 (14,27) 315783 TPCO 3.2 21312 BOHLER /VI/21
A5.1

AWS
GTAW FLANGE ASME A105 RTJ 12" Sch 40 94330 ITALY A5.18 2.4 19131 BOHLER 07/RT/
WPS/ 01/FVWIR-
Butt R/H/ BIT-
3 50A SHOP ASME/ 24-May ACC 26-May CBN-02 ACC MBE-6/ N/R N/R 29/06/21 ACC N/R N/R
Weld F/C SEGWW
WP002 AWS CBN/2021
SMAW PIPE API 5L Gr. B 18" Sch 40 (14,27) 315783 TPCO 3.2 21312 BOHLER /VI/21
A5.1

AWS
GTAW FLANGE ASME A105 RTJ 12" Sch 40 94330 ITALY 2.4 19131 BOHLER 07/RT/
WPS/ A5.18 01/FVWIR-
Butt ASME/ R/H/ MBE-6/ BIT-
4 51 Weld SHOP 24-May ACC 26-May F/C CBN-02 ACC N/R N/R 29/06/21 SEGWW ACC N/R N/R
WP002 AWS CBN/2021
SMAW PIPE API 5L Gr. B 18" Sch 40 (14,27) 315783 TPCO 3.2 21312 BOHLER /VI/21
A5.1

AWS
GTAW SOCKOLET ASTM A105N #6000 1.1/2 x 4 Sch 80 AIXE MEGA 2.4 19131 BOHLER 008/
WPS/ A5.18 01/FVWIR-
Fillet PT/BIT-
5 52 FIELD ASME/ 12-Jul ACC 14-Jul F/C CBN-015 ACC MBE-6/ 24/07/21 ACC N/R N/R N/R N/R
Weld SEGWW
WP002 AWS CBN/2021
SMAW PIPE API 5L Gr. B 18" Sch 40 (14,27) 315783 TPCO 3.2 21312 BOHLER /VII/21
A5.1

SOCKOLET ASTM A105N #6000 1.1/2 x 4 Sch 80 AIXE MEGA 008/


WPS/ 01/FVWIR-
Fillet AWS PT/BIT-
6 53 SHOP ASME/ GTAW 2.4 20116 BOHLER 2-Jul ACC 7-Jul F/C CBN-015 ACC MBE-6/ 24/07/21 ACC N/R N/R N/R N/R
Weld A5.18 SEGWW
WP005 CBN/2021
PIPE NIPPLE TP316/316L 1 1/2 x 3" Sch 80 545960 SANDVIK /VII/21

PIPE NIPPLE TP316/316L 1 1/2 x 3" Sch 80 545960 SANDVIK 008/


WPS/ 01/FVWIR-
Fillet AWS PT/BIT-
7 54 SHOP ASME/ GTAW 2.4 20129 BOHLER 2-Jul ACC 12-Jul F/C CBN-06 ACC MBE-6/ 24/07/21 ACC N/R N/R N/R N/R
Weld A5.18 SEGWW
WP002 TP316/316L TP316/316L E182330. CBN/2021
FLANGE GALPERTI /VII/21
SW#600 RF SW#600 RF A

AWS
GTAW SOCKOLET ASTM A105N #6000 3/4 x 1 " Sch 80 ANGK MEGA A5.18 2.4 21010 BOHLER 007/
WPS/ 01/FVWIR-
Fillet PT/BIT-
8 55 FIELD ASME/ 12-Jul ACC 14-Jul F/C CBN-015 ACC MBE-6/ 24/07/21 ACC N/R N/R N/R N/R
Weld SEGWW
WP002 AWS CBN/2021
SMAW PIPE API 5L Gr. B 18" Sch 40 (14,27) 315783 TPCO 3.2 21613 BOHLER /VII/21
A5.1

Prepared by Reviewed by
Reviewed by Approved by

PT. CIPTA BANGUN NUSANTARA PT. CIPTA BANGUN NUSANTARA


STAR ENERGY GEOTHERMAL (WAYANG WINDU) Ltd. STAR ENERGY GEOTHERMAL (WAYANG WINDU) Ltd.

( M HIFNI SYAHBANA ) ( RICKY FIRMANSYAH ) ( ) ( )


PT. CIPTA BANGUN NUSANTARA WELDING TRACEBILITY REPORT STAR ENERGY GEOTHERMAL (WAYANG WINDU) LTD.

Project : MBE-6 PRODUCTION PIPING HOOK UP


Line Inspected : 18" T3-17-1761 TH BRANCH LINE Report no. : 01/FVWIR-MBE-6/CBN/2021
Contractor : PT. CIPTA BANGUN NUSANTARA Sheet no. : 1 OF 11
Client : STAR ENERGY GEOTHERMAL (WAYANG WINDU) LTD. Date :
Acceptance Criteria : ASME B31.1-2020 Area : MBE-6

JOINT BASE METAL MATERIAL WELDING CONSUMABLE MATERIAL VISUAL INSPECTION NON DESTRUCTIVE TEST (NDT)
WPS
SHOP/
NO FIELD Fit-Up Welding PT UT RT (INITIAL) RT (Rep 1) RT (Rep 2) REMARK
Dia.
No Type Description Specification Size / Thk Heat No. Brand AWS Class (mm) LOT No. Brand Report No.
No. Process Date Result Date Seq Welder ID Result DATE REPORT RESULT DATE REPORT RESULT DATE REPORT RESULT DATE REPORT RESULT DATE REPORT RESULT

MBE-6 18" T3-17-1761 TH BRANCH LINE (Drawing No: W1902-17-ME-DRG-1011 )

TP316/316L #600 012/


FLANGE 3/4" Sch 80 473983 GALPERTI
WPS/ RF 01/FVWIR- PT/
Fillet AWS
1 41 SHOP ASME/ GTAW 2.4 20129 BOHLER 2-Jul ACC 12-Jul F/C CBN-06 ACC MBE-6/ ### SEGWW ACC N/R N/R N/R N/R
Weld A5.18
WP004 3/4" x 100 mm Sch NIPPON CBN/2021 /BIT/
PIPE NIPPLE TP316/316L F021027 VII/21
80 STEEL

3/4" x 100 mm Sch NIPPON 012/


PIPE NIPPLE TP316/316L F021027
WPS/ 80 STEEL 01/FVWIR- PT/
Fillet AWS
2 42 SHOP ASME/ GTAW 2.4 20129 BOHLER 2-Jul ACC 12-Jul F/C CBN-06 ACC MBE-6/ ### SEGWW ACC N/R N/R N/R N/R
Weld A5.18
WP004 CBN/2021 /BIT/
VALVE TP316/316L 3/4" #800 B27 FVB VII/21

VALVE TP316/316L 3/4" #800 B27 FVB 012/


WPS/ 01/FVWIR- PT/
Fillet AWS
3 43 SHOP ASME/ GTAW 2.4 20129 BOHLER 2-Jul ACC 12-Jul F/C CBN-06 ACC MBE-6/ ### SEGWW ACC N/R N/R N/R N/R
Weld A5.18
WP004 3/4" x 100 mm Sch CBN/2021 /BIT/
PIPE NIPPLE TP316/316L 509975 SANYO VII/21
80

AWS
GTAW PIPE API 5L Gr. B 18" Sch 40 (14,27) 315783 TPCO 2.4 19131 BOHLER CBN-015 05/RT/
WPS/ A5.18 01/FVWIR-
Butt ASME/ R/H/ MBE-6/ BIT-
4 44 Weld SHOP 4-May ACC 19-May F/C ACC N/R N/R 29/06/21 SEGWW ACC N/R N/R
WP002 18"x 12" Sch 40 TECHNO AWS CBN/2021
SMAW TEE REDUCE ASTM A234 Gr.WPB 91692 3.2 21312 BOHLER CBN-002 /VI/21
(14,27) FORGE A5.1

AWS
GTAW PIPE ASTM A234 Gr.WPB 18" Sch 40 (14,27) 315783 TPCO 2.4 19131 BOHLER 06/RT/
WPS/ A5.18 01/FVWIR-
Butt R/H/ BIT-
5 45 SHOP ASME/ 22-May ACC 23-May CBN-02 ACC MBE-6/ N/R N/R 29/06/21 ACC N/R N/R
Weld F/C SEGWW
WP002 AWS CBN/2021
SMAW ELBOW 45 API 5L Gr. B 18" Sch 40 (14,27) 9Y3M19 AWAJI 3.2 21312 BOHLER /VI/21
A5.1

AWS
GTAW ELBOW 45 ASTM A234 Gr.WPB 18" Sch 40 (14,27) 9Y3M19 AWAJI 2.4 19131 BOHLER 06/RT/
WPS/ A5.18 01/FVWIR-
Butt R/H/ BIT-
6 46 SHOP ASME/ 1-Jun ACC 2-Jun CBN-02 ACC MBE-6/ N/R N/R 29/06/21 ACC N/R N/R
Weld F/C SEGWW
WP002 AWS CBN/2021
SMAW PIPE API 5L Gr. B 18" Sch 40 (14,27) TPCO 3.2 21312 BOHLER /VI/21
315783 A5.1

2020
AWS
GTAW ELBOW 45 ASTM A234 Gr.WPB 18" Sch 40 0000 TECHTUBI 2.4 19131 BOHLER 56/RT/
WPS/ A5.18 01/FVWIR-
Butt 1847 R/H/ BIT-
7 47 SHOP ASME/ 4-May ACC 21-May CBN-002 ACC MBE-6/ N/R N/R 17/07/21 ACC N/R N/R
Weld F/C SEGWW
WP002 AWS CBN/2021
SMAW PIPE API 5L Gr. B 18" Sch 40 (14,27) TPCO 3.2 21312 BOHLER /VII/21
315783 A5.1

ASTM A234 Gr.WPB AWS


GTAW ELBOW 45 3D 18" Sch 40 (14,27) 970698 TECHTUBI A5.18 2.4 19131 BOHLER 55/RT/
WPS/ 01/FVWIR-
Butt R/H// BIT-
8 48 SHOP ASME/ 8-Jul ACC 12-Jul CBN-015 ACC MBE-6/ N/R N/R 17/07/21 ACC N/R N/R
Weld F/C SEGWW
WP002 AWS CBN/2021
SMAW ELBOW 45 ASTM A234 Gr.WPB 18" Sch 40 (14,27) 963M32Y AWAJI 3.2 21312 BOHLER /VII/21
A5.1

Prepared by Reviewed by
Reviewed by Approved by

PT. CIPTA BANGUN NUSANTARA PT. CIPTA BANGUN NUSANTARA


STAR ENERGY GEOTHERMAL (WAYANG WINDU) Ltd. STAR ENERGY GEOTHERMAL (WAYANG WINDU) Ltd.

( M HIFNI SYAHBANA ) ( RICKY FIRMANSYAH ) ( ) ( )


PT. CIPTA BANGUN NUSANTARA WELDING TRACEBILITY REPORT STAR ENERGY GEOTHERMAL (WAYANG WINDU) LTD.

Project : MBE-6 PRODUCTION PIPING HOOK UP


Line Inspected : 18" T3-17-1761 TH BRANCH LINE Report no. : 01/FVWIR-MBE-6/CBN/2021
Contractor : PT. CIPTA BANGUN NUSANTARA Sheet no. : 1 OF 11
Client : STAR ENERGY GEOTHERMAL (WAYANG WINDU) LTD. Date :
Acceptance Criteria : ASME B31.1-2020 Area : MBE-6

JOINT BASE METAL MATERIAL WELDING CONSUMABLE MATERIAL VISUAL INSPECTION NON DESTRUCTIVE TEST (NDT)
WPS
SHOP/
NO FIELD Fit-Up Welding PT UT RT (INITIAL) RT (Rep 1) RT (Rep 2) REMARK
Dia.
No Type Description Specification Size / Thk Heat No. Brand AWS Class (mm) LOT No. Brand Report No.
No. Process Date Result Date Seq Welder ID Result DATE REPORT RESULT DATE REPORT RESULT DATE REPORT RESULT DATE REPORT RESULT DATE REPORT RESULT

MBE-6 18" T3-17-1761 TH BRANCH LINE (Drawing No: W1902-17-ME-DRG-1011 )

SOCKOLET ASTM A105N #6000 3/4 x 1 " Sch 80 ANGK MEGA 011/
WPS/ 01/FVWIR- PT/
Fillet AWS
1 33 SHOP ASME/ GTAW 2.4 20116 BOHLER 30-Jun ACC 12-Jul F/C CBN-015 ACC MBE-6/ ### SEGWW ACC N/R N/R N/R N/R
Weld A5.18
WP005 3/4" x 100 mm Sch NIPPON CBN/2021 /BIT/
PIPE NIPPLE TP316/316L F021027 VII/21
80 STEEL

3/4" x 100 mm Sch NIPPON 011/


PIPE NIPPLE TP316/316L F021027
WPS/ 80 STEEL 01/FVWIR- PT/
Fillet AWS
2 34 SHOP ASME/ GTAW 2.4 20129 BOHLER 30-Jun ACC 12-Jul F/C CBN-06 ACC MBE-6/ ### SEGWW ACC N/R N/R N/R N/R
Weld A5.18
WP004 TP316/316L #600 CBN/2021 /BIT/
FLANGE 3/4" Sch 80 473983 GALPERTI VII/21
RF

3/4" x 100 mm Sch NIPPON 011/


PIPE NIPPLE TP316/316L 80 F021027 STEEL
WPS/ 01/FVWIR- PT/
Fillet AWS
3 35 SHOP ASME/ GTAW 2.4 20129 BOHLER 2-Jul ACC 12-Jul F/C CBN-06 ACC MBE-6/ ### SEGWW ACC N/R N/R N/R N/R
Weld A5.18
WP004 TP316/316L #600 CBN/2021 /BIT/
FLANGE 3/4" Sch 80 473983 GALPERTI VII/21
RF

3/4" x 100 mm Sch NIPPON 011/


PIPE NIPPLE TP316/316L F021027
WPS/ 80 STEEL 01/FVWIR- PT/
Fillet ASME/ AWS MBE-6/ SEGWW
4 36 Weld SHOP GTAW A5.18 2.4 20129 BOHLER 2-Jul ACC 12-Jul F/C CBN-06 ACC ### ACC N/R N/R N/R N/R
WP004 CBN/2021 /BIT/
VALVE TP316/316L 3/4" #800 B27 FVB VII/21

VALVE TP316/316L 3/4" #800 B27 FVB 011/


WPS/ 01/FVWIR- PT/
Fillet AWS
5 37 SHOP ASME/ GTAW 2.4 20129 BOHLER 2-Jul ACC 12-Jul F/C CBN-06 ACC MBE-6/ ### SEGWW ACC N/R N/R N/R N/R
Weld A5.18
WP004 3/4" x 100 mm Sch NIPPON CBN/2021 /BIT/
PIPE NIPPLE TP316/316L 80 F021027 STEEL VII/21

AWS 012/
GTAW PIPE API 5L Gr. B 18" Sch 40 (14,27) 315783 TPCO 2.4 21010 BOHLER
WPS/ A5.18 01/FVWIR- PT/
Fillet
6 38 FIELD ASME/ 24-Jul ACC 25-Jul F/C CBN-06 ACC MBE-6/ ### SEGWW ACC N/R N/R N/R N/R
Weld
WP006 AWS CBN/2021 /BIT/
SMAW SOCKOLET ASTM A105N #6000 3/4 x 1 " Sch 80 ANGK MEGA 3.2 21613 BOHLER VII/21
A5.1

SOCKOLET ASTM A105N #6000 3/4 x 1 " Sch 80 ANGK MEGA 012/
WPS/ 01/FVWIR- PT/
Fillet AWS
7 39 SHOP ASME/ GTAW 2.4 20116 BOHLER 2-Jul ACC 12-Jul F/C CBN-015 ACC MBE-6/ ### SEGWW ACC N/R N/R N/R N/R
Weld A5.18
WP005 3/4" x 100 mm Sch NIPPON CBN/2021 /BIT/
PIPE NIPPLE TP316/316L F021027 VII/21
80 STEEL

3/4" x 100 mm Sch NIPPON 012/


PIPE NIPPLE TP316/316L 80 F021027 STEEL
WPS/ 01/FVWIR- PT/
Fillet AWS
8 40 SHOP ASME/ GTAW 2.4 20129 BOHLER 2-Jul ACC 12-Jul F/C CBN-06 ACC MBE-6/ ### SEGWW ACC N/R N/R N/R N/R
Weld A5.18
WP004 TP316/316L #600 CBN/2021 /BIT/
FLANGE 3/4" Sch 80 473983 GALPERTI VII/21
RF

Prepared by Reviewed by
Reviewed by Approved by

PT. CIPTA BANGUN NUSANTARA PT. CIPTA BANGUN NUSANTARA


STAR ENERGY GEOTHERMAL (WAYANG WINDU) Ltd. STAR ENERGY GEOTHERMAL (WAYANG WINDU) Ltd.

( M HIFNI SYAHBANA ) ( RICKY FIRMANSYAH ) ( ) ( )


PT. CIPTA BANGUN NUSANTARA WELDING TRACEBILITY REPORT STAR ENERGY GEOTHERMAL (WAYANG WINDU) LTD.

Project : MBE-6 PRODUCTION PIPING HOOK UP


Line Inspected : 18" T3-17-1761 TH BRANCH LINE Report no. : 01/FVWIR-MBE-6/CBN/2021
Contractor : PT. CIPTA BANGUN NUSANTARA Sheet no. : 1 OF 11
Client : STAR ENERGY GEOTHERMAL (WAYANG WINDU) LTD. Date :
Acceptance Criteria : ASME B31.1-2020 Area : MBE-6

JOINT BASE METAL MATERIAL WELDING CONSUMABLE MATERIAL VISUAL INSPECTION NON DESTRUCTIVE TEST (NDT)
WPS
SHOP/
NO FIELD Fit-Up Welding PT UT RT (INITIAL) RT (Rep 1) RT (Rep 2) REMARK
Dia.
No Type Description Specification Size / Thk Heat No. Brand AWS Class (mm) LOT No. Brand Report No.
No. Process Date Result Date Seq Welder ID Result DATE REPORT RESULT DATE REPORT RESULT DATE REPORT RESULT DATE REPORT RESULT DATE REPORT RESULT

MBE-6 18" T3-17-1761 TH BRANCH LINE (Drawing No: W1902-17-ME-DRG-1011 )

SOCKOLET ASTM A105N #6000 1 x 1.1/4" Sch 80 AEKN MEGA 010/


WPS/ 01/FVWIR- PT/
Fillet AWS
1 25 SHOP ASME/ GTAW 2.4 20116 BOHLER 30-Jun ACC 12-Jul F/C CBN-015 ACC MBE-6/ 24/07/21 SEGWW ACC N/R N/R N/R N/R
Weld A5.18
WP005 CBN/2021 /BIT/
PIPE NIPPLE TP316/316L PBE 1" Sch 80 AENM MEGA VII/21

PIPE NIPPLE TP316/316L PBE 1" Sch 80 AENM MEGA 010/


WPS/ 01/FVWIR- PT/
Fillet AWS
2 26 SHOP ASME/ GTAW 2.4 20129 BOHLER 2-Jul ACC 12-Jul F/C CBN-06 ACC MBE-6/ 24/07/21 SEGWW ACC N/R N/R N/R N/R
Weld A5.18
WP004 TP316/316L E200657. CBN/2021 /BIT/
FLANGE 1" Sch 40 GALPERTI VII/21
SW#600 RF A

PIPE NIPPLE TP316/316L PBE 1" Sch 80 AENM MEGA 010/


WPS/ 01/FVWIR- PT/
Fillet AWS
3 27 SHOP ASME/ GTAW 2.4 20129 BOHLER 2-Jul ACC 12-Jul F/C CBN-06 ACC MBE-6/ 24/07/21 SEGWW ACC N/R N/R N/R N/R
Weld A5.18
WP004 TP316/316L CBN/2021 /BIT/
FLANGE 1" Sch 40 E190914.A GALPERTI VII/21
SW#600 RF

PIPE NIPPLE TP316/316L PBE 1" Sch 80 AENM MEGA 010/


WPS/ 01/FVWIR- PT/
Fillet ASME/ AWS MBE-6/
4 28 Weld SHOP GTAW A5.18 2.4 20129 BOHLER 2-Jul ACC 12-Jul F/C CBN-06 ACC 24/07/21 SEGWW ACC N/R N/R N/R N/R
WP004 CBN/2021 /BIT/
VALVE TP316/316L 1" #800 R71L FVB VII/21

TP316/316L PBE TUBOS 010/


PIPE NIPPLE 1" Sch 80 122614
WPS/ TOE REUNIDOS 01/FVWIR- PT/
Fillet AWS
5 29 SHOP ASME/ GTAW 2.4 20129 BOHLER 2-Jul ACC 12-Jul F/C CBN-06 ACC MBE-6/ 24/07/21 SEGWW ACC N/R N/R N/R N/R
Weld A5.18
WP004 CBN/2021 /BIT/
VALVE TP316/316L 1" #800 R71L FVB VII/21

TP316/316L PBE TUBOS


PIPE NIPPLE 1" Sch 80 122614
TOE REUNIDOS
6 30 THREADED THREADED

VALVE TP316/316L 1" NPT L20 GTA

VALVE TP316/316L 1" NPT L20 GTA

7 31 THREADED THREADED

BUSHING ASTM A182 H 1 x 1/2" HEX HEAD YBFN MEGA

AWS 011/
GTAW PIPE API 5L Gr. B 18" Sch 40 (14,27) 315783 TPCO A5.18 2.4 21010 BOHLER
WPS/ 01/FVWIR- PT/
Fillet
8 32 FIELD ASME/ MBE-6/ 30/07/21 SEGWW ACC N/R N/R N/R N/R
Weld
WP006 AWS CBN/2021 /BIT/
SMAW SOCKOLET ASTM A105N #6000 3/4 x 1 " Sch 80 ANGK MEGA 3.2 21613 BOHLER VII/21
A5.1

Prepared by Reviewed by
Reviewed by Approved by

PT. CIPTA BANGUN NUSANTARA PT. CIPTA BANGUN NUSANTARA


STAR ENERGY GEOTHERMAL (WAYANG WINDU) Ltd. STAR ENERGY GEOTHERMAL (WAYANG WINDU) Ltd.

( M HIFNI SYAHBANA ) ( RICKY FIRMANSYAH ) ( ) ( )


PT. CIPTA BANGUN NUSANTARA WELDING TRACEBILITY REPORT STAR ENERGY GEOTHERMAL (WAYANG WINDU) LTD.

Project : MBE-6 PRODUCTION PIPING HOOK UP


Line Inspected : 18" T3-17-1761 TH BRANCH LINE Report no. : 01/FVWIR-MBE-6/CBN/2021
Contractor : PT. CIPTA BANGUN NUSANTARA Sheet no. : 1 OF 11
Client : STAR ENERGY GEOTHERMAL (WAYANG WINDU) LTD. Date :
Acceptance Criteria : ASME B31.1-2020 Area : MBE-6

JOINT BASE METAL MATERIAL WELDING CONSUMABLE MATERIAL VISUAL INSPECTION NON DESTRUCTIVE TEST (NDT)
WPS
SHOP/
NO FIELD Fit-Up Welding PT UT RT (INITIAL) RT (Rep 1) RT (Rep 2) REMARK
Dia.
No Type Description Specification Size / Thk Heat No. Brand AWS Class (mm) LOT No. Brand Report No.
No. Process Date Result Date Seq Welder ID Result DATE REPORT RESULT DATE REPORT RESULT DATE REPORT RESULT DATE REPORT RESULT DATE REPORT RESULT

MBE-6 18" T3-17-1761 TH BRANCH LINE (Drawing No: W1902-17-ME-DRG-1011 )

HYUNDAE AWS
GTAW FLANGE ASME A105 RTJ 12" Sch 40 57349 2.4 19131 BOHLER CBN-015
WPS/ FITINGS A5.18 01/FVWIR-
Butt R/H/ 05/RT/
1 17 SHOP ASME/ 4-May ACC 19-May ACC MBE-6/ N/R N/R 29/06/21 ACC N/R N/R
Weld F/C VI
WP002 18"x 12" Sch 40 AWS CBN/2021
SMAW TEE REDUCE ASTM A234 Gr.WPB 4T790 3.2 21312 BOHLER CBN-002
(14,27) A5.1

AWS 005/
GTAW SOCKOLET ASTM A105N #6000 1 x 1.1/4" Sch 80 AEKN MEGA 2.4 21010 BOHLER
WPS/ A5.18 01/FVWIR- PT/
Fillet
2 18 FIELD ASME/ 23-Jul ACC 24-Jul R/F/C CBN-020 ACC MBE-6/ 24/07/21 SEGWW ACC N/R N/R N/R N/R
Weld
WP005 SeAH STEEL AWS CBN/2021 /BIT/
SMAW PIPE API 5L Gr.B 18" Sch 40 (14,27) R1821560 3.2 21600 BOHLER VII/21
CORP A5.1

AWS 005/
GTAW SOCKOLET ASTM A105N #6000 1 x 1.1/4" Sch 80 AEKN MEGA A5.18 2.4 21010 BOHLER
WPS/ 01/FVWIR- PT/
Fillet
3 19 SHOP ASME/ 30-Jun ACC 7-Jul F/C CBN-015 ACC MBE-6/ 24/07/21 SEGWW ACC N/R N/R N/R N/R
Weld
WP002 AWS CBN/2021 /BIT/
SMAW PIPE NIPPLE TP316/316L 1"x 100 mm Sch 80 559445 SANDVIK 3.2 21600 BOHLER VII/21
A5.1

AWS 005/
GTAW PIPE NIPPLE TP316/316L 1"x 100 mm Sch 80 559445 SANDVIK 2.4 21010 BOHLER
WPS/ A5.18 01/FVWIR- PT/
Fillet ASME/ MBE-6/
4 20 Weld SHOP 30-Jun ACC 7-Jul F/C CBN-06 ACC 24/07/21 SEGWW ACC N/R N/R N/R N/R
WP002 TP316/316L #600 E150373. AWS CBN/2021 /BIT/
SMAW FLANGE 1" Sch 40 GALPERTI 3.2 21600 BOHLER VII/21
RF A A5.1

TP316/316L 005/
FLANGE 1" Sch 40 E190914.A GALPERTI
WPS/ SW#600 RF 01/FVWIR- PT/
Fillet AWS
5 21 SHOP ASME/ GTAW 2.4 20129 BOHLER 2-Jul ACC 7-Jul F/C CBN-06 ACC MBE-6/ 24/07/21 SEGWW ACC N/R N/R N/R N/R
Weld A5.18
WP004 CBN/2021 /BIT/
PIPE NIPPLE TP316/316L 1 x 4" Sch 80 559445 SANDVIK VII/21

AWS 005/
GTAW SOCKOLET ASTM A105N #6000 1 x 1.1/4" Sch 80 AEKN MEGA 2.4 21010 BOHLER
WPS/ A5.18 01/FVWIR- PT/
Fillet
6 22 SHOP ASME/ 30-Jun ACC 7-Jul F/C CBN-06 ACC MBE-6/ 24/07/21 SEGWW ACC N/R N/R N/R N/R
Weld
WP002 AWS CBN/2021 /BIT/
SMAW PIPE NIPPLE TP316/316L 1"x 100 mm Sch 80 559445 SANDVIK 3.2 21600 BOHLER VII/21
A5.1

AWS 005/
GTAW PIPE NIPPLE TP316/316L 1"x 100 mm Sch 80 559445 SANDVIK 2.4 21010 BOHLER
WPS/ A5.18 01/FVWIR- PT/
Fillet
7 23 SHOP ASME/ 30-Jun ACC 7-Jul F/C CBN-06 ACC MBE-6/ 24/07/21 SEGWW ACC N/R N/R N/R N/R
Weld
WP002 TP316/316L #600 E150373. AWS CBN/2021 /BIT/
SMAW FLANGE 1" Sch 40 GALPERTI 3.2 21600 BOHLER VII/21
RF A A5.1

SOCKOLET ASTM A105N #6000 1 x 1.1/4" Sch 80 AEKN MEGA 010/


WPS/ 01/FVWIR- PT/
Fillet AWS
8 24 FIELD ASME/ GTAW 2.4 19131 BOHLER 13-Jul ACC 15-Jul R/F/C CBN-06 ACC MBE-6/ 24/07/21 SEGWW ACC N/R N/R N/R N/R
Weld A5.18
WP005 CBN/2021 /BIT/
PIPE API 5L Gr. B 18" Sch 40 (14,27) 315783 TPCO VII/21

Prepared by Reviewed by
Reviewed by Approved by

PT. CIPTA BANGUN NUSANTARA PT. CIPTA BANGUN NUSANTARA


STAR ENERGY GEOTHERMAL (WAYANG WINDU) Ltd. STAR ENERGY GEOTHERMAL (WAYANG WINDU) Ltd.

( M HIFNI SYAHBANA ) ( RICKY FIRMANSYAH ) ( ) ( )


PT. CIPTA BANGUN NUSANTARA WELDING TRACEBILITY REPORT STAR ENERGY GEOTHERMAL (WAYANG WINDU) LTD.

Project : MBE-6 PRODUCTION PIPING HOOK UP


Line Inspected : 18" T3-17-1761 TH BRANCH LINE Report no. : 01/FVWIR-MBE-6/CBN/2021
Contractor : PT. CIPTA BANGUN NUSANTARA Sheet no. : 1 OF 11
Client : STAR ENERGY GEOTHERMAL (WAYANG WINDU) LTD. Date :
Acceptance Criteria : ASME B31.1-2020 Area : MBE-6

JOINT BASE METAL MATERIAL WELDING CONSUMABLE MATERIAL VISUAL INSPECTION NON DESTRUCTIVE TEST (NDT)
WPS
SHOP/
NO FIELD Fit-Up Welding PT UT RT (INITIAL) RT (Rep 1) RT (Rep 2) REMARK
Dia.
No Type Description Specification Size / Thk Heat No. Brand AWS Class (mm) LOT No. Brand Report No.
No. Process Date Result Date Seq Welder ID Result DATE REPORT RESULT DATE REPORT RESULT DATE REPORT RESULT DATE REPORT RESULT DATE REPORT RESULT

MBE-6 18" T3-17-1761 TH BRANCH LINE (Drawing No: W1902-17-ME-DRG-1011 )

AWS
GTAW PIPE API 5L Gr. B 18" Sch 40 (14,27) 315783 TPCO 2.4 19131 BOHLER 03/RT/
WPS/ A5.18 01/FVWIR-
Butt R/H/ BIT-
1 9 SHOP ASME/ 3-Jun ACC 4-Jun CBN-06 ACC MBE-6/ N/R N/R 28/06/21 ACC N/R N/R
Weld F/C SEGWW
WP002 AWS CBN/2021
SMAW ELBOW 45 ASTM A234 Gr.WPB 18" Sch 40 (14,27) 9Y3M19 AWAJI 3.2 21312 BOHLER /VI/21
A5.1

AWS
GTAW PIPE API 5L Gr. B 18" Sch 40 (14,27) 315783 TPCO 2.4 19131 BOHLER 03/RT/ 03/RT/
WPS/ A5.18 01/FVWIR-
Butt R/H/ BIT- BIT-
2 10 SHOP ASME/ 1-Jun ACC 2-Jun CBN-06 ACC MBE-6/ N/R N/R 28/06/21 REP 19/07/21 ACC N/R
Weld F/C SEGWW SEGWW/
WP002 AWS CBN/2021
SMAW ELBOW 45 ASTM A234 Gr.WPB 18" Sch 40 (14,27) 9Y3M19 AWAJI 3.2 21312 BOHLER /VI/21 VI/21
A5.1

AWS
GTAW FLANGE ASME A105 RTJ 18" Sch 80 94330 ITALY A5.18 2.4 19131 BOHLER CBN-015 03/RT/ 03/RT/
WPS/ 01/FVWIR-
Butt R/H/ BIT- BIT-
3 11 SHOP ASME/ 4-May ACC 20-May ACC MBE-6/ N/R N/R 29/06/21 REP 17/07/21 ACC N/R
Weld F/C SEGWW SEGWW/
WP002 AWS CBN/2021
SMAW PIPE API 5L Gr. B 18" Sch 40 (14,27) 315783 TPCO 3.2 21312 BOHLER CBN-002 /VI/21 VI/21
A5.1

ASME A105 AWS


GTAW FLANGE 18" Sch 40 94330 ITALY 2.4 19131 BOHLER 04/RT/
WPS/ WN/RTJ #600 A5.18 01/FVWIR-
Butt ASME/ R/H/ MBE-6/ BIT-
4 12 Weld SHOP 3-May ACC 22-May F/C CBN-02 ACC N/R N/R 29/06/21 SEGWW ACC N/R N/R
WP002 AWS CBN/2021
SMAW PIPE API 5L Gr. B 18" Sch 40 (14,27) TPCO 3.2 21312 BOHLER /VI/21
315783 A5.1

AWS
GTAW PIPE API 5L Gr. B 18" Sch 40 (14,27) 315783 TPCO 2.4 21010 BOHLER 55/RT/
WPS/ A5.18 01/FVWIR-
Butt R/H/ BIT-
5 13 FIELD ASME/ 2-Jul ACC 12-Jul CBN-06 ACC MBE-6/ N/R N/R 17/07/21 ACC N/R N/R
Weld F/C SEGWW
WP002 AWS CBN/2021
SMAW PIPE API 5L Gr. B 18" Sch 40 (14,27) 315783 TPCO 3.2 21613 BOHLER /VII/21
A5.1

AWS
GTAW PIPE API 5L Gr. B 18" Sch 40 (14,27) 315783 TPCO 2.4 19131 BOHLER
WPS/ A5.18 01/FVWIR-
Butt R/H/ 04/RT/
6 14 SHOP ASME/ 3-May ACC 21-May CBN-015 ACC MBE-6/ N/R N/R 29/06/21 ACC N/R N/R
Weld OFFICINE F/C VI
WP002 ASME A105 WN/RF AWS CBN/2021
SMAW FLANGE 18" Sch 40 453076 S NICOLA 3.2 21312 BOHLER
#600 A5.1
GALPERTI
OFFICINE
ASME A105 WN/RF AWS
GTAW FLANGE 18" Sch 40 453076 S NICOLA 2.4 19131 BOHLER
WPS/ #600 A5.18 01/FVWIR-
Butt GALPERTI R/H/ 05/RT/
7 15 SHOP ASME/ 3-May ACC 22-May CBN-02 ACC MBE-6/ N/R N/R 29/06/21 ACC N/R N/R
Weld F/C VI
WP002 AWS CBN/2021
SMAW PIPE API 5L Gr. B 18" Sch 40 (14,27) 315783 TPCO 3.2 21312 BOHLER
A5.1

18"x 12" Sch 40 TECHNO AWS


GTAW TEE REDUCE ASTM A234 Gr.WPB (14,27) 91692 FORGE A5.18 2.4 19131 BOHLER 55/RT/
WPS/ 01/FVWIR-
Butt R/H/ BIT-
8 16 FIELD ASME/ 13-Jul ACC 16-Jul CBN-015 ACC MBE-6/ N/R N/R 17/07/21 ACC N/R N/R
Weld F/C SEGWW
WP002 AWS CBN/2021
SMAW PIPE API 5L Gr. B 18" Sch 40 (14,27) TPCO 3.2 21312 BOHLER /VII/21
315783 A5.1

Prepared by Reviewed by
Reviewed by Approved by

PT. CIPTA BANGUN NUSANTARA PT. CIPTA BANGUN NUSANTARA


STAR ENERGY GEOTHERMAL (WAYANG WINDU) Ltd. STAR ENERGY GEOTHERMAL (WAYANG WINDU) Ltd.

( M HIFNI SYAHBANA ) ( RICKY FIRMANSYAH ) ( ) ( )


PT. CIPTA BANGUN NUSANTARA WELDING TRACEBILITY REPORT STAR ENERGY GEOTHERMAL (WAYANG WINDU) LTD.

Project : MBE-6 PRODUCTION PIPING HOOK UP


Line Inspected : 18" T3-17-1761 TH BRANCH LINE Report no. : 01/FVWIR-MBE-6/CBN/2021
Contractor : PT. CIPTA BANGUN NUSANTARA Sheet no. : 1 OF 11
Client : STAR ENERGY GEOTHERMAL (WAYANG WINDU) LTD. Date :
Acceptance Criteria : ASME B31.1-2020 Area : MBE-6

JOINT BASE METAL MATERIAL WELDING CONSUMABLE MATERIAL VISUAL INSPECTION NON DESTRUCTIVE TEST (NDT)
WPS
SHOP/
NO FIELD Fit-Up Welding PT UT RT (INITIAL) RT (Rep 1) RT (Rep 2) REMARK
Dia.
No Type Description Specification Size / Thk Heat No. Brand AWS Class (mm) LOT No. Brand Report No.
No. Process Date Result Date Seq Welder ID Result DATE REPORT RESULT DATE REPORT RESULT DATE REPORT RESULT DATE REPORT RESULT DATE REPORT RESULT

MBE-6 18" T3-17-1761 TH BRANCH LINE (Drawing No: W1902-17-ME-DRG-1011 )


OFFICINE
AWS
GTAW FLANGE ASME A105 RTJ 12" Sch 80 807494 NICOLA 2.4 19131 BOHLER CBN-015 01/RT/
WPS/ A5.18 01/FVWIR-
Butt GALPERTI R/H/ BIT-
1 1 SHOP ASME/ 3-May ACC 20-May ACC MBE-6/ N/R N/R 28/06/21 ACC N/R N/R
Weld F/C SEGWW
WP002 12 x 18" Sch 80 TK AWS CBN/2021
SMAW REDUCER ASTM A234 Gr.WPB CU252 3.2 21312 BOHLER CBN-002 /VI/21
(23,8 & 17,5) Corporation A5.1

12 x 18" Sch 80 TK AWS


GTAW REDUCER ASTM A234 Gr.WPB CU252 2.4 19131 BOHLER 01/RT/
WPS/ (23,8 & 17,5) Corporation A5.18 01/FVWIR-
Butt R/H/ BIT-
2 2 SHOP ASME/ 3-May ACC 18-May CBN-015 ACC MBE-6/ N/R N/R 28/06/21 ACC N/R N/R
Weld F/C SEGWW
WP002 AWS CBN/2021
SMAW TEE ASTM A234 Gr.WPB 18" Sch 80 (23,8) TK CORP 3.2 21312 BOHLER /VI/21
18AV508 A5.1

12 x 18" Sch 80 AWS


GTAW REDUCER ASTM A234 Gr.WPB (23,8 & 17,5) CU252 TK CORP A5.18 2.4 19131 BOHLER 01/RT/
WPS/ 01/FVWIR-
Butt R/H/ BIT-
3 3 SHOP ASME/ 22-May ACC 23-May CBN-02 ACC MBE-6/ N/R N/R 28/06/21 ACC N/R N/R
Weld F/C SEGWW
WP002 AWS CBN/2021
SMAW TEE ASTM A234 Gr.WPB 18" Sch 80 (23,8) TK CORP 3.2 21312 BOHLER /VI/21
18AV508 A5.1

OFFICINE
AWS
GTAW FLANGE ASME A105 RTJ 12" Sch 80 807494 NICOLA 2.4 19131 BOHLER 01/RT/
WPS/ A5.18 01/FVWIR-
Butt GALPERTI R/H/ BIT-
4 4 SHOP ASME/ 1-Jun ACC 3-Jun CBN-06 ACC MBE-6/ N/R N/R 28/06/21 ACC N/R N/R
Weld TK F/C SEGWW
WP002 12 x 18" Sch 80 AWS CBN/2021
SMAW REDUCER ASTM A234 Gr.WPB CU252 CORPORATI 3.2 21312 BOHLER /VI/21
(23,8 & 17,5) A5.1
ON

AWS
GTAW PIPE API 5L Gr. B 18" Sch 40 (14,27) 315783 TPCO 2.4 19131 BOHLER 02/RT/
WPS/ A5.18 01/FVWIR-
Butt R/H/ BIT-
5 5 SHOP ASME/ 22-May ACC 23-May CBN-015 ACC MBE-6/ N/R N/R 28/06/21 ACC N/R N/R
Weld F/C SEGWW
WP002 AWS CBN/2021
SMAW TEE ASTM A234 Gr.WPB 18" Sch 80 (23,8) TK CORP 3.2 21312 BOHLER /VI/21
18AV508 A5.1

AWS
GTAW FLANGE ASME A105 RTJ 18" Sch 40 94330 ITALY 2.4 19131 BOHLER CBN-015 02/RT/
WPS/ A5.18 01/FVWIR-
Butt R/H/ BIT-
6 6 SHOP ASME/ 4-May ACC 19-May ACC MBE-6/ N/R N/R 28/06/21 ACC N/R N/R
Weld F/C SEGWW
WP002 AWS CBN/2021
SMAW PIPE API 5L Gr. B 18" Sch 40 (14,27) 315783 TPCO 3.2 21312 BOHLER CBN-002 /VI/21
A5.1

AWS
GTAW FLANGE ASME A105 RTJ 18" Sch 80 94330 ITALY 2.4 19131 BOHLER 02/RT/
WPS/ A5.18 01/FVWIR-
Butt R/H/ BIT-
7 7 SHOP ASME/ 21-May ACC 22-May CBN-015 ACC MBE-6/ N/R N/R 28/06/21 ACC N/R N/R
Weld F/C SEGWW
WP002 AWS CBN/2021
SMAW ELBOW 45 API 5L Gr. B 18" Sch 40 (14,27) 9Y3M19 AWAJI 3.2 21312 BOHLER /VI/21
A5.1

AWS
GTAW PIPE API 5L Gr. B 18" Sch 40 (14,27) 315783 TPCO A5.18 2.4 19131 BOHLER CBN-015 03/RT/
WPS/ 01/FVWIR-
Butt R/H/ BIT-
8 8 SHOP ASME/ 3-May ACC 20-May ACC MBE-6/ N/R N/R 28/06/21 ACC N/R N/R
Weld F/C SEGWW
WP002 AWS CBN/2021
SMAW ELBOW 45 ASTM A234 Gr.WPB 18" Sch 40 (14,27) 9Y3M19 AWAJI 3.2 21312 BOHLER CBN-002 /VI/21
A5.1

Prepared by Reviewed by
Reviewed by Approved by

PT. CIPTA BANGUN NUSANTARA PT. CIPTA BANGUN NUSANTARA


STAR ENERGY GEOTHERMAL (WAYANG WINDU) Ltd. STAR ENERGY GEOTHERMAL (WAYANG WINDU) Ltd.

( M HIFNI SYAHBANA ) ( RICKY FIRMANSYAH ) ( ) ( )

You might also like