MARTABE MILLING CAPACITY EXPANTION

PROJECT

CLOUMN SPACE INSPECTION REPORT

CLIENT : PT. Agincourt resources REPORT NO :

CONTRACTOR : PT.EMK DATE :

SUBJECT : RegrindBuilding Switch Room REFF. DRAWING :

AREA : Regrind Area TYPE INSPECTION :


Coloumn Space Check

Sketch N

2 4 6 9

1
3 5 7

Coloumn Space Inspection Report


No. Coloum No. Grid Result Remarks
Design ( mm ) Actual ( mm )

1 5-6 1C-2D 7900

2 5-7 1C-1D 8000

3 7-8 1D 3950

4 8-9 1D 3950

5 6-9 C- D 8000

Name equipment :
Calibration Date :

Prepared/Witnessed By : Witnessed/Reviewed By : Witnessed/Reviewed By : Witnessed/Approved By :


PT.EMK PT.DUTA PT.EMK PT.AR
Surveyor Surveyor QA/QC Egineer Senior QA/QC Enginner

Name : Sandy / Fery Name : Name : Yuwantoni Name : Srira Raharja


Date : Date : Date : Date