PROJECT : SUPPLY AND DELIVERY OF FUEL GAS CONDITIONING UNIT(FGCU) AND ASSOCIATED EQUIPMENT
FOR 15 MW POWER PLANT FOR GARRAF DEVELOPMENT FACILITY OPERATION DATE : 26/12/2013
0°
45°
MATERIAL SA516 GR.70N
THICKNESS 12.7MM
135° L
LENGTH (L) 1800MM & 1080MM 180° A B
LS#2 686 687 687 688 687 687 687 686 686 1080 688 1802 ±2 ±1 ACCEPTED
I Hereby Certify that the above item are made in complince with the above mentioned code.
1 of 6
ECTION REPORT AFTER WELDING
SEC VIII DIV-1 (UG-80) 2010ED/2011 ADD
REMARKS
ACCEPTED
ACCEPTED
CLIENT REPRESENTATIVE
2 of 6
Technics Offshore Engineering Pte Ltd
72,Loyang Way,Singapore-508762,Tel. 65-65459968
Website:www.technicsgrp.com
PROJECT : SUPPLY AND DELIVERY OF FUEL GAS CONDITIONING UNIT(FGCU) AND ASSOCIATED EQUIPMENT
FOR 15 MW POWER PLANT FOR GARRAF DEVELOPMENT FACILITY OPERATION DATE : 26/12/2013
0°
45°
MATERIAL SA516 GR.70N
THICKNESS 12.7MM
135° L
LENGTH (L) 1800MM & 1080MM 180° A B
LS#2 686 687 687 688 687 686 687 686 686 1080 688 1802 ±2 ±1 ACCEPTED
I Hereby Certify that the above item are made in complince with the above mentioned code.
3 of 6
ECTION REPORT AFTER WELDING
SEC VIII DIV-1 (UG-80) 2010ED/2011 ADD
REMARKS
ACCEPTED
ACCEPTED
CLIENT REPRESENTATIVE
4 of 6
Technics Offshore Engineering Pte Ltd
72,Loyang Way,Singapore-508762,Tel. 65-65459968
Website:www.technicsgrp.com
PROJECT : SUPPLY AND DELIVERY OF FUEL GAS CONDITIONING UNIT(FGCU) AND ASSOCIATED EQUIPMENT
FOR 15 MW POWER PLANT FOR GARRAF DEVELOPMENT FACILITY OPERATION DATE : 26/12/2013
0°
45°
MATERIAL SA516 GR.70N
THICKNESS 12.7MM
135° L
LENGTH (L) 1800MM & 1080MM 180° A B
LS#2 686 688 687 687 688 686 687 686 686 1080 688 1802 ±2 ±1 ACCEPTED
I Hereby Certify that the above item are made in complince with the above mentioned code.
5 of 6
ECTION REPORT AFTER WELDING
SEC VIII DIV-1 (UG-80) 2010ED/2011 ADD
REMARKS
ACCEPTED
ACCEPTED
CLIENT REPRESENTATIVE
6 of 6