You are on page 1of 6

Technics Offshore Engineering Pte Ltd

72,Loyang Way,Singapore-508762,Tel. 65-65459968


Website:www.technicsgrp.com

SHELL ROLLING INSPECTION REPORT AFTER WELDING


SPECIFICATION: ASME SEC VIII DIV-1 (UG-80) 2010ED/2011 ADD

PROJECT : SUPPLY AND DELIVERY OF FUEL GAS CONDITIONING UNIT(FGCU) AND ASSOCIATED EQUIPMENT
FOR 15 MW POWER PLANT FOR GARRAF DEVELOPMENT FACILITY OPERATION DATE : 26/12/2013

PROJECT NO : TOE-13068 TAG NO : V-7511C


.
DRAWING NO : 91013010-M-DW-101-16 REPORT NO : TOE-13068-SR-03

DESCRIPTION : PRIMARY OIL SEPARATOR U STAMP : TOE-U-1037-14


45°
MATERIAL SA516 GR.70N

HEAT NO / PL NO. G0637/673230113 90° SHELL LS#1 & LS#2

THICKNESS 12.7MM
135° L
LENGTH (L) 1800MM & 1080MM 180° A B

O.D & I.D 711.4MM & 686MM

0° 45° 90° 135° REQUIRED ACTUAL TOLERANCE


SHELL REMARKS
A B A B A B A B ID L ID L ID L
LS#1 687 686 687 687 686 686 687 686 686 1800 687 1081 ±2 ±1 ACCEPTED

LS#2 686 687 687 688 687 687 687 686 686 1080 688 1802 ±2 ±1 ACCEPTED

I Hereby Certify that the above item are made in complince with the above mentioned code.

TOEPL (QC INSPECTOR) ABSG (AUTHORISED INSPECTOR) CLIENT REPRESENTATIVE

1 of 6
ECTION REPORT AFTER WELDING
SEC VIII DIV-1 (UG-80) 2010ED/2011 ADD

REMARKS

ACCEPTED

ACCEPTED

CLIENT REPRESENTATIVE

2 of 6
Technics Offshore Engineering Pte Ltd
72,Loyang Way,Singapore-508762,Tel. 65-65459968
Website:www.technicsgrp.com

SHELL ROLLING INSPECTION REPORT AFTER WELDING


SPECIFICATION: ASME SEC VIII DIV-1 (UG-80) 2010ED/2011 ADD

PROJECT : SUPPLY AND DELIVERY OF FUEL GAS CONDITIONING UNIT(FGCU) AND ASSOCIATED EQUIPMENT
FOR 15 MW POWER PLANT FOR GARRAF DEVELOPMENT FACILITY OPERATION DATE : 26/12/2013

PROJECT NO : TOE-13068 TAG NO : V-7511B


.
DRAWING NO : 91013010-M-DW-101-16 REPORT NO : TOE-13068-SR-02

DESCRIPTION : PRIMARY OIL SEPARATOR U STAMP : TOE-U-1036-14


45°
MATERIAL SA516 GR.70N

HEAT NO / PL NO. G0638/673230157 90° SHELL LS#1 & LS#2

THICKNESS 12.7MM
135° L
LENGTH (L) 1800MM & 1080MM 180° A B

O.D & I.D 711.4MM & 686MM

0° 45° 90° 135° REQUIRED ACTUAL TOLERANCE


SHELL REMARKS
A B A B A B A B ID L ID L ID L
LS#1 687 687 686 687 686 686 688 686 686 1800 687 1081 ±2 ±1 ACCEPTED

LS#2 686 687 687 688 687 686 687 686 686 1080 688 1802 ±2 ±1 ACCEPTED

I Hereby Certify that the above item are made in complince with the above mentioned code.

TOEPL (QC INSPECTOR) ABSG (AUTHORISED INSPECTOR) CLIENT REPRESENTATIVE

3 of 6
ECTION REPORT AFTER WELDING
SEC VIII DIV-1 (UG-80) 2010ED/2011 ADD

REMARKS

ACCEPTED

ACCEPTED

CLIENT REPRESENTATIVE

4 of 6
Technics Offshore Engineering Pte Ltd
72,Loyang Way,Singapore-508762,Tel. 65-65459968
Website:www.technicsgrp.com

SHELL ROLLING INSPECTION REPORT AFTER WELDING


SPECIFICATION: ASME SEC VIII DIV-1 (UG-80) 2010ED/2011 ADD

PROJECT : SUPPLY AND DELIVERY OF FUEL GAS CONDITIONING UNIT(FGCU) AND ASSOCIATED EQUIPMENT
FOR 15 MW POWER PLANT FOR GARRAF DEVELOPMENT FACILITY OPERATION DATE : 26/12/2013

PROJECT NO : TOE-13068 TAG NO : V-7511A


.
DRAWING NO : 91013010-M-DW-101-16 REPORT NO : TOE-13068-SR-01

DESCRIPTION : PRIMARY OIL SEPARATOR U STAMP : TOE-U-1035-14


45°
MATERIAL SA516 GR.70N

HEAT NO / PL NO. G0637/673230113 90° SHELL LS#1 & LS#2

THICKNESS 12.7MM
135° L
LENGTH (L) 1800MM & 1080MM 180° A B

O.D & I.D 711.4MM & 686MM

0° 45° 90° 135° REQUIRED ACTUAL TOLERANCE


SHELL REMARKS
A B A B A B A B ID L ID L ID L
LS#1 687 687 686 687 686 686 687 688 686 1800 687 1081 ±2 ±1 ACCEPTED

LS#2 686 688 687 687 688 686 687 686 686 1080 688 1802 ±2 ±1 ACCEPTED

I Hereby Certify that the above item are made in complince with the above mentioned code.

TOEPL (QC INSPECTOR) ABSG (AUTHORISED INSPECTOR) CLIENT REPRESENTATIVE

5 of 6
ECTION REPORT AFTER WELDING
SEC VIII DIV-1 (UG-80) 2010ED/2011 ADD

REMARKS

ACCEPTED

ACCEPTED

CLIENT REPRESENTATIVE