You are on page 1of 4

TEAM C

PROJECT NO. :
TOE 04086

DRAWING FILE
NGINEERING DRAWING (PPS)
ENG
PROJECT NO. : PROJECT NO. :
TOE 04087 TOE 04087

TEAM C TEAM C

VESSEL VESSEL
GENERAL GENERAL
ARRANGEMENT ARRANGEMENT
FOR INDIRECT FOR INDIRECT
HEATER 3MM HEATER 3MM
BTU/hr BTU/hr

FILE NO. : 01 FILE NO. : 01

04087-01 04087

FILE DESCRIPTION FILE DESCRIPTION

SUBMITTED SUBMITTED
DOCUMENTS DOCUMENTS

CLIENT CLIENT

PRODUCTION TESTERS PRODUCTION TESTERS


PTE LTD PTE LTD

OWNER OWNER

- -
PROJECT NO. : PROJECT NO. :
TOE 05062 TOE 05058

TEAM C TEAM C

INTERNAL
WEST ESPOIR MODIFICATION
INTEGRATION OF WATER WASH
VESSEL

FILE NO. : 01 FILE NO. : 01

05062 05058-01

FILE DESCRIPTION FILE DESCRIPTION

SUBMITTED SUBMITTED
DOCUMENTS DOCUMENTS

CLIENT CLIENT

PROSAFE PRODUCTION PRODUCTION TESTERS


PTE LTD. PTE LTD

OWNER OWNER

- -