Inspection Procedure
This document as well as the information or data contained herein are confidential and shall not be copied, recopied,
reproduced, transmitted, disclosed or distributed to others or otherwise used for any purpose without the express, prior
and written permission of Tenaris Connections AG and/or Hydril Company and/or its affiliated companies ("Tenaris").
This document as well as the information or data contained herein are the exclusive property of Tenaris, and are to be
returned upon request therefore. All rights in proprietary and novel features of the subject matter are expressly reserved
by Tenaris. Recipient?s agreement to the foregoing is indicated by acceptance of this document. Copyrighted 2008 as an
unpublished work. ALL RIGHTS RESERVED.
For PVD Qualification Document Type Inspection Procedure
Document Number TSH-IP-53.0061
Primary Seal Inspection
Wedge Box Threads Revision 01
Page Number 2
1. REVISION HISTORY
Effective
Rev. # Change Referenced Sections Prepared By: Reviewed by: Approved By:
Date
Document Change
Disposition of
Affected Material
Raw Material X
In Process X
Completed X
For PVD Qualification Document Type Inspection Procedure
Document Number TSH-IP-53.0061
Primary Seal Inspection
Wedge Box Threads Revision 01
Page Number 3
2. PURPOSE
2.1 The Purpose of this document is to explain how the measurement of the Box Thread Primary
Seal is perform by use of a plug gage, for connections 14.0” OD and a MRP gage for
connections > 14.0” OD for TenarisHydril Wedge Box Threads.
3. PERSONS AFFECTED
4. REFERENCES
Not Applicable.
5.1 Definitions and Abbreviations are defined in the most current revision of TenarisHydril document
TSH-GP-00-0001.
6. RESPONSIBILITIES
6.1 Responsibilities are defined in the most current revision of TenarisHydril document
TSH-GP-00-0002.
7. PERSONNEL QUALIFICATION
7.1 Personnel qualification is defined in the most current revision of TenarisHydril document
TSH-GP-00-0003.
8. PROCEDURES
8.1 Inspection
8.1.1.2 A TenarisHydril seal plug gage is used to establish the location of the seal
diameter relative to the basic thread width, datum –C—box connection. Screw the
seal gage into the box connection until it makes up securely with the load flank of
the threads and the seal surface. The standard line on the box OD should fall
within the standard and tolerance lines etched on the OD of the seal gage. There
is a gross check to prevent the gage from being a full revolution out of tolerenace.
Gross error standard requirements are etched on the OD of the gage..
For PVD Qualification Document Type Inspection Procedure
Document Number TSH-IP-53.0061
Primary Seal Inspection
Wedge Box Threads Revision 01
Page Number 4
8.1.1.3 Bluing requirements are specified on the product drawing, Blue in accordance with
TSH-IP-00.0074
8.1.2.1 The MRP Seal gage shall replace the Primary seal gage as stated above. All
other requirements shall apply except Primary Seal Bluing in accordance with
TSH–IP-00.0074 is not required and Primary seal width measurement is not
required.
The result of this inspection is acceptable if the measured values are within the values indicated
on the inspection report and/or within the limits indicated on the OD of the Gauge.
8.5 Records
The result of these inspections shall be recorded on the IR.
9. ANNEX
Not applicable.