PROJECT:

2 X 660 MW SUPERCRITICAL THERMAL POWER PROJECT (STAGE- I)


Krishnapatnam, Nellore (Dist), Andhra Pradesh FICHTNER Consulting Engineers (India)
Private Limited, (FI) Chennai.
VENDOR DRAWING REVIEW STATUS

AGREEMENT NO.: TPCIL/BTG/SPA200910 o


o
Action - I
Action - II
Approved
Approved except as noted on drawing. Revise
drawing and resubmit for records.
o Action - III Returned with Comments. Resubmit for approval.
o
OWNER:
Action - IV Rejected
o Action - V Information received.
o Action - VI Information noted Retained for reference and records.
This document has been reviewed as noted with regard to general

THERMAL POWERTECH CORPORATION INDIA LIMITED conformity with the Contract specifications and requirements. The Vendor /
Contractor is responsible for correctness of design calculation and details.
Approval of this document does not relieve the Vendor / Contractor of his
responsibility in carrying out the work correctly and fulfilling the complete
requirements of the contract nor does it limit the purchaser's rights under the

Hyderabad, India FI Letter Ref. No. Date:


contract.

CNT 1109171/ PM-6.1/937/1718 05.02.2016

Signature Initials: AS

OWNER’s ENGINEER :
FICHTNER Consulting Engineers (India) Private Limited
Chennai, India

BTG CONTRACTOR:
DONGFANG ELECTRIC CORPORATION LIMITED
Chengdu, China

Sub Contractor:
Northwest Electric Power Institute Of Commissioning
Xian, China

Document Title:

Performance Test Procedure


(CPU)
Document No.: DECL-PGT-006 Rev.

Owner’s Doc. No.:


2
DECL’s Doc. No.: KNPN_DDBSE3_SB_ DECL-PGT-G

24th Dec.
2 刘立鹏 郁翔 王永庆 苏耕
2015
Date Rev Prepared by Checked by Reviewed by Approved by Details of Rev
Performance Test Procedure (CPU) Rev.2

CPU 性 能 试 验 程 序
Performance Test Procedure
( CPU )

DECL-PGT-004 1/4
Performance Test Procedure (CPU) Rev.2

1. Test purpose
To Check the performance of CPU.

2. Test items
2.1 PH value of effluent discharge from CPU.
2.2 Guarantee value: PH~8.5.

3. Guidelines of the Test


ASTM D1293-1999(2005) Standard Test Methods for pH of water

4. Test Conditions
a) The unit shall be maintained stable operation during the performance test.
b) During the test, CPU should be run smoothly more than 80% designed capacity.
c) Sampling should not less than 3 times with an interval of 10 minutes.

5. Sampling Points
Sampling point should be located in outlet of mixed bed or discharge header.

Sampling point

discharge header.
Out

6. Test Instruments
仪 器 名 称 示值误差 示 值 重 复 性 输入阻抗引起的示值误差 仪器示值总误差

Instrument Indication Indication Indication error by Total Indication

name error repeatability Input impedance error

多参数测试仪 0.00pH 0.00pH 0.00pH 0.01pH

DECL-PGT-004 2/4
Performance Test Procedure (CPU) Rev.2

7. Record chart 记录表

pH value of effluent discharge from CPU (NO. Unit, Time: )


No. Item Unit Test Value Guarantee value Equipment Remark

1 pH(25℃) - 6~9 pH meter


2

10

11

8. example 算例

pH i 7.61 7.87 8.22 8.04

pH 7.94

DECL-PGT-004 3/4
Performance Test Procedure (CPU) Rev.2

9. 附录 Appendix
性能试验工况认可书

Approval Document for the Performance Test Conditions

业主 Owner: THERMAL POWER ECH CORPORATION INDIA LIMITED

试验机组 Test unit:印度科瑞希纳 2×660MW 超临界燃煤电站 号机组

unit:No. Unit for Indian Krishnapatnam 2×660MW Super Critical Coal-fired Power Plant

试验地点 Location for test: 试验日期 Test date:

试验工况 Test test conditions: 制造厂 manufactor:

○机组的系统及运行状态满足试验条件;The system and operating state meet the test

conditions;

○试验用仪器、仪表已全部经过校验合格、工作正常、有效,可以用于本次试验;

All instruments and meters required by the test are all checked and qualified after

试验开始确认 verification, suitable for this test;

Confirmation at ○试验人员全部到位,能够胜任试验工作;All staff involved in the test are in readiness

start time of the and qualified to conduct this test;

test ○各方均同意开始进行试验。Various parties agree to undertake this test.

试验开始时间:Start time of the test:

确认签字:Confirmed by signature:

业主:Owner: 制造厂家:Manufacturer: DEC:

○试验时间满足试验要求;The test time meets the test requirements;

○试验数据完整、准确、真实、有效。各方均保留一份原始数据文件一套备案;The data

of the test is complete, accurate, true and effective. Various parties maintain one document
试验结束确认
of original data for records;
Confirmation at
○各方均同意结束本次试验测试。Various parties agree to complete this test
end time of the
试验结束时间:End time of the test:
test
确认签字:Confirmed by signature:

业主:Owner: 制造厂家:Manufacturer: DEC:

DECL-PGT-004 4/4