Professional Documents
Culture Documents
OWNER’s ENGINEER : This document has been reviewed as noted with regard to general
conformity with the Contract specifications and requirements. The Vendor /
Contractor is responsible for correctness of design calculation and details.
FICHTNER Consulting Engineers (India) Private Limited Approval of this document does not relieve the Vendor / Contractor of his
responsibility in carrying out the work correctly and fulfilling the complete
requirements of the contract nor does it limit the purchaser's rights under the
contract.
Sub Contractor:
Northwest Electric Power Institute Of Commissioning
Xian, China
Document Title:
Ap p e n d i x C C : P e r f o r m a n c e Te s t P r o c e d u r e ( Au x i l i a r y P o w e r C o n s u m p t i o n )
Dec. 29
2 肖延 杨建安 王永庆 苏耕
2015
July 10
1 肖延 杨建安 王永庆 苏耕
2014
Nov.6
0 肖延 杨建安 王永庆 苏耕
2014
Date Rev Prepared by Checked by Reviewed by Approved by Details of Rev
Performance Test Procedure (Auxiliary power consumption) Rev. 2
Appendix CC:
辅助电耗性能试验程序
Performance Test Procedure
(AUXILIARY POWER CONSUMPTION )
DECL-PGT-003 1/8
Performance Test Procedure (Auxiliary power consumption) Rev. 2
1. Purpose
The purpose of the auxiliary power consumption test is to determine whether the auxiliary power
consumption for BTG package can meet the guarantee value.
2. Test Guidelines
2.1 Exhibit F in the contract.
2.2 ASME PTC 6-2004.
2.3 The list of auxiliary power consumption shall include the equipments running continuously during unit
normal operation.
3. Guarantee Value
Total auxiliary power consumption for BTG package (Per Unit): 29235kW
A Boiler Auxiliaries
1 Mill Main Motor Type I
2 F.D Fan Main Motor Type I
3 I.D Fan Main Motor Type I
4 P.A Fan Main Motor Type I
5 Sealing Air Fan Main Motor Type I
6 ESP LT Type I
7 Feeder Main Motor Type I
8 Air Preheater Main Motor Type I
9 Flame Scanner Fan Main Motor Type I
10 Mill Oil Station Type II
DECL-PGT-003 2/8
Performance Test Procedure (Auxiliary power consumption) Rev. 2
5. Deleted.
DECL-PGT-003 3/8
Performance Test Procedure (Auxiliary power consumption) Rev. 2
Sl.
Measuring points unit Test value remark
No.
DECL-PGT-003 4/8
Performance Test Procedure (Auxiliary power consumption) Rev. 2
DECL-PGT-003 5/8
Performance Test Procedure (Auxiliary power consumption) Rev. 2
Sl.
Measuring points unit Test Value remark
No.
32 PA Fan Oil Station--A kW
DECL-PGT-003 6/8
Performance Test Procedure (Auxiliary power consumption) Rev. 2
Sl.
Measuring points Unit Test Value Remark
No.
1. TDBFP Booster Pump--A kW
2. TDBFP Booster Pump--B kW
3. CEP--A kW
4. CEP--B kW
5. CEP--C kW
6. Vacuum Pump--A kW
7. Vacuum Pump--B kW
8. Vacuum Pump--C kW
9. CCCW Pump--A kW
10. CCCW Pump--B kW
11. CCCW Pump--C kW
12. ACW Pump--A kW
13. ACW Pump--B kW
Condensate Polishing Unit
14. kW
(CPU)--A
Generator Stator Cooling Water
15. kW
Pump--A
Generator Stator Cooling Water
16. kW
Pump--B
DECL-PGT-003 7/8
Performance Test Procedure (Auxiliary power consumption) Rev. 2
Sl.
Measuring points Unit Test Value Remark
No.
17. Generator Sealing Oil Pump--A kW
18. Generator Sealing Oil Pump--B kW
19. Generator Vacuum Sealing Oil kW
Pump
DECL-PGT-003 8/8