DOCUMENT SUBMISSION STATUS: FOR CONSTRUCTION

2 10.07.2018 FOR CONSTRUCTION J.Y.CHOI K.H.HWANG Y.G.JUNG


1 07.06.2018 FOR CONSTRUCTION J.Y.CHOI K.H.HWANG Y.G.JUNG
0 26.02.2018 FOR CONSTRUCTION J.Y.CHOI K.H.HWANG Y.G.JUNG
REV DATE DESCRIPTION PREPARED CHECKED APPROVED

PROJECT TITLE

SONG HAU 1 THERMAL POWER PLANT (2x600MW)

OWNER OWNER’S CONSULTANT

VIETNAM OIL AND GAS GROUP (PVN) FICHTNER GmbH & Co. KG PV ENGINEERING

EPC CONTRACTOR EPC CONTRACTOR’S CONSULTANT

VIETNAM MACHINERY INSTALLATION TOKYO ELECTRIC POWER SERVICES


CORPORATION (LILAMA) COMPANY LIMITED - TEPSCO
SUB-CONTRACTOR

DATE NAME SIGN DOCUMENT TITLE

PREPARED 10.07.2018 J.Y.CHOI

GRAPHIC DESIGN FOR TURBINE


CHECKED 10.07.2018 K.H.HWANG
CONTROL SYSTEM
APPROVED 10.07.2018 Y.G.JUNG

DOCUMENT NO. REV.


SH1-DHI-P0CJJ-I-M01-DMM-3806 2
GRAPHIC DESIGN FOR TURBINE CONTROL SYSTEM
SONGHAU 1 THERMAL POWER PLANT

NO DESCRIPTION GRAPHIC NO. PAGE NO.


1 PAGE INDEX - 1/53
2 TCS MAIN MENU (INDEX) 1000 2/53
3 SYSTEM STATUS 1800 3/53
4 VALVE CALIBRATION 1 3192 4/53
5 VALVE CALIBRATION 2 3194 5/53
6 TURBINE START UP 3201 6/53
7 TURBINE UNIT CONTROL 3202 7/53
8 TURBINE SYNCRONIZATION 3203 8/53
9 TURBINE STRESS 3204 9/53
10 TURBINE ROTOR PREWARMING 3205 10/53
11 TURBINE CHEST WARMING 3206 11/53
12 TURBINE LIMITER 3207 12/53
13 TURBINE START PERMISSIVE 3208 13/53
14 TURBINE HOLDS 3209 14/53
15 TURBINE VIBRATION 3211 15/53
16 TURBINE TEMPERATURES 3212 16/53
17 GEN H2 GAS TEMPERATURE 3213 17/53
18 GEN WATER DETECTION 3214 18/53
19 STATOR RTD'S/CORE TC'S 3215 19/53
20 STATOR TC'S 3216 20/53
21 GENERATOR CAPABILITY CURVE 3217 21/53
22 TURBINE STEAM SEAL SYSTEM 3221 22/53
23 TURBINE LUBE OIL SYSTEM 3222 23/53
24 TURBINE SEAL OIL SYSTEM 3223 24/53
25 TURBINE HYDRAULIC POWER UNIT 3224 25/53
26 STATOR COOLING WATER 3225 26/53
27 GLAND STEAM CONDENSER 3226 27/53
28 TURBINE TURNING GEAR 3227 28/53
29 TURBINE MOV 3228 29/53
30 ETD TEST 3231 30/53
31 OFF-LINE OVERSPEED TEST 3232 31/53
32 VALVE TEST 3233 32/53
33 TRIP 3241 33/53
34 TRIP FIRST OUT 3242 34/53
35 BFPT UNIT CONTROL 3251 35/53
36 BFPT TURNING GEAR 3252 36/53
37 BFPT TRIP 3253 37/53
38 BFPT START PERMISSIVE 3254 38/53
39 BFPT AUTOSTART HOLDS 3255 39/53
40 BFPT SUPERVISORY 3256 40/53
41 BFPT BEARING TEMPERATURES 3257 41/53
42 BFPT PRESSURE 3258 42/53
43 BFPT DRAIN MONITOR 3259 43/53
44 BFPT MOV'S 3260 44/53
45 BFPT MOTOR CONTROL 3261 45/53
46 BFPT HEADER VALVE 3262 46/53
47 BFPT A TRIP FIRST OUT 3263 47/53
48 BFPT B TRIP FIRST OUT 3264 48/53
49 BFPT A ETD TEST 3271 49/53
50 BFPT OFF-LINE OVERSPEED TEST 3272 50/53
51 BFPT VALVE TEST 3273 51/53
52 BFPT B ETD TEST 3274 52/53
53 PLU 3290 53/53

1/53
2/53
2

3/53
4/53
5/53
2

6/53
7/53
8/53
2

2
2

9/53
10/53
11/53
12/53
13/53
14/53
15/53
2

16/53
17/53
18/53
19/53
20/53
21/53
22/53
2

23/53
2

24/53
25/53
26/53
2

27/53
28/53
29/53
30/53
2

31/53
32/53
2

33/53
2

34/53
35/53
36/53
2 2

37/53
38/53
39/53
2

40/53
41/53
42/53
2

43/53
44/53
45/53
46/53
2

47/53
2

48/53
49/53
50/53
51/53
52/53
53/53

You might also like