You are on page 1of 15

Document No.

: PWA-RPD-CON-FM-1518
Material Equipment Inspection Revision No. : 03
Request Issue Date : 17 Sep 2020

Project Details
CDCBP-P086-CP02A-
Project No: PA 2019 C113G Submittal No.:
JEC-MIR-CIV-1437
Revision No.: 00 Date: 18-Feb-2024 No. of Copies:

Project Title: Central Doha & Corniche Beautification Package – 2A

GEC PARSONS Contractor: Al Jaber Engineering

To: The GEC


The following material/equipment is delivered to Site and requires inspection

1 Material / Equipment

'INSPECTION REQUEST FOR Stainless steel handrail staircase 1 & 2 as per attached Deliver Note
SAK/D23/001063 (Note :Material at Factory )

 Specific ☐ Propose  Sample Attached

Materials Submittal Ref.


CDCBP-P086-CP02A-JEC-MS-0467 Submittal Approval Date: 07-Jun-2022
No.:

BOQ Ref. No : 5A.1 Specification No.: -

Unit:
Quantity: 120 LMS Reference: -
Numbers
Attachments
Delivery Note / Test Certificate Discipline: Civil
(Docs/Brochures):

2 Manufacturer’s Details

Manufacturer: Jiangsu Cunrui Metal Products Co.Ltd

Model No.:

Country of Origin: China

Storage Location: Factory

Inspection Time of
Date of Arrival on Site: 18-11-2023 Date:
19-Feb-2024 Inspection:
8:00 AM

Contractor

Name: Diosdado Tenorio Signature: Date: 18-Feb-2024

3. Supplier/Agent:

Contact No.: +974 4498 1826

Contract Name: Saad Al Kaabi Steel & Aluminum Co W.L.L

Address: Doha, Qatar

THIS DOCUMENT IS UNCONTROLLED ONCE PRINTED - Last printed 17/09/2020 12:18 Page 1 of 2
Document No. : PWA-RPD-CON-FM-1518
Material Equipment Inspection Revision No. : 03
Request Issue Date : 17 Sep 2020

GEC Inspection Report

Yes No Initials Yes No Initials

Physical Damage? ☐ ☐ Delivery Note / Pack List ☐ ☐

Details given above, correct? ☐ ☐ Country of Orig. Cert. ☐ ☐

Conform to Approval Submission? ☐ ☐ Identification Tag ☐ ☐

Accessories / Spare Parts Included? ☐ ☐ ☐ ☐


Details:
inspection done MCT and photograph attached subject to NDT Test report

GEC's Action / Comments

The above material has been inspected on Site and found at time of inspection to be

☐ Satisfactory ☐ Satisfactory subject to compliance with comments ☐ Unsatisfactory

for incorporation in the permanent works

Inspected By:

Name: MUHAMMAD QAYYUM Signature: Date: 03/03/24

To: The Contractor

We return hereby this commented MIR. Above inspection shall not relieve the Contractor of its responsibilities
to incorporate in the works only such materials that are in conformity with the Contract
Rejected materials must be resubmitted for approval

Authorised GEC

Name: Sherwin (QA/QC Mgr.) Signature: Date: 03/03/24

THIS DOCUMENT IS UNCONTROLLED ONCE PRINTED - Last printed 17/09/2020 12:18 Page 2 of 2
David Saffar SRE
4 July 2022