DNO QUALITY CONTROL

INSPECTION REQUEST FORM (IR) IR No.: IR- 002


Note 1: All Inspection Requests are to be forwarded to qaqc.kurdistan@dno.no 24 hours in advance unless directly arranged with DNO QA/QC.
Note 2: Contractor QA/QC shall confirm with the DNO Discipline Supervisor(s) that the work activities are released for inspection prior to submission
of form. Ensure check box is ticked after confirmation and the DNO Supervisor is in email copy to the IR Form submission to QA/QC.
Note 3: IR number shall follow the following sequence IR- 001, IR- 002 etc for the particular project / scope.
Note 4: The issue of this document does not relieve the Contractor from its responsibility to provide a CLIENT compliant product or service.
Note 5: This Inspection Report is not a substitute nor stands as a formal report of any activity. It is provides and audit trail of compliances to the ITP.
Note 6: In circumstance were the work scope is split between two contractors a Work Transfer Certificate (WTC) May be required based on the work
criticality. This document is permanently embedded into this IR Form. Instructions for completion are provided within the WTC Form.
Note 7: DNO PM will notify both contractors formally with respect to the need WTC on a Project case by case basis.
Contractor Name: Talia Contract No.: C-22042-TWK

Project Title: E&I Construction for TWK AGI Power – VO#1 PWS Instruments.

Project No.: KU-TWK-089

DNO Field: Tawke Inspection Location: EPF-2

Area / System: PWS Area Discipline: E&I

Inspection Date: 27.06.2022 A.M. ☒ P.M. ☐ Est. Duration: 1 Hr.

Requested By: Narrson Emanuel Tel. No: +964 750 198 2673

ITP No. ITP Activity No. Attached ITP


• N/A
• N/A

Reference Drawings – Include Revision No.s Attach Drawing(s) as ‘Objects’


• KU-TWK-10-PR-PID-0303-33_I_P&ID 3-Phase
Separator (15-V-02)
• KU-TWK-10-PR-PID-0300-33_I_P&ID Common
FWKO-Degasser (15-V-01)
Check to declare work is ‘Ready for Inspection’ confirmed by DNO Construction Supervisor ☐
Type of Inspection: Tick One Box Only

Hold Point: ☐ Witness Point: ☐ Approval Point: ☒

Ad-Hoc Inspection: ☐ Interim Inspection: ☐ Final Inspection: ☐

Details Inspection Request:

1- Re-inspection of cable glands.


2- Re-inspection of cable trays.
3- Inspection of cable termination to instrument JBs and PCVs

INSPECTION REQUEST FORM Rev. 5 (FEB-2019)


Inspection Results – DNO QA/QC to Complete

Accepted ☐ Rejected ☐ Waived ☐ Cancelled ☐ Re-scheduled ☐

Observations & Comments: DNO QA/QC to Complete

- Cable tray should be extended

Attachments & Photos:

DNO-WTC Guidance Notes -


READ!

Released By (CONTRACTOR):
Name Position Date Signature

Narrson Emanuel SM 26-Jun-22

Inspected By (DNO):
Name Position Date Signature

27.June.2022

INSPECTION REQUEST FORM Rev. 5 (FEB-2019)