You are on page 1of 4

Consultant Client Contractor

Amana Steel Buildings


Archcorp architectural Engineering Mai Dubai
Contracting L.L.C.

MAI DUBAI FACTORY EXPANSION

INSPECTION & TEST PLAN FOR


TESTING & COMMISSINING OF
STAT-X AEROSOL FIRE SUPPRESSION SYSTEM

Document No: DJ-232 HBW-P-AAE-QC-ITP-6006 Rev. 00

REV DATE DESCRIPTION AMANA CONSULTANT

PREPARED APPROVED

1 Comments incorporated
25-04-17

0 19-03-17 Issued for Approval QAQC PM

DOCUMENT No. REV DATE


Page 1 of 4
DJ-232HBW-P-AAE-QC-MST-6006 00 05- 12 – 2018
Consultant Client Contractor
Amana Steel Buildings
Archcorp architectural Engineering Mai Dubai
Contracting L.L.C.

LEGEND

FI - Full Inspection by Project Management or Consultant

R - Responsibility. Inspection Request is required. The Consultant shall witness and


sign for acceptance the inspection checking form. Contractor shall not proceed until
consultant has completed inspection and signed inspection checking form.Further
following certification shall be submitted for review (e.g. Laboratory / Third Party
Service Company).

W - Witness Point. Inspection Request is required. The consultant shall optionally


witness. Contractor can proceed with inspection even if consultant approval as per
inspection request. In such cases inspection report should be submitted for review
and signature. Further following certification shall be submitted for review (e.g.
Laboratory / Third Party Service Company).

S - Surveillance. Check advice is not required. The Consultant shall spot witness
during job execution. The clarification if any shall be spot reviewed.

A - For Approval
IFCD - Issued For Construction Drawing
N/A - Not Applicable
R - Review of certification
1) Manufacturer’s certificates to be submitted to Consultant.
2) Manufacturer’s certificates check.
3) Data sheet/Catalogues to be submitted to Consultant.
4) Data sheet/Catalogues check.
5) Calibration certificates to be submitted to consultant
6) Calibration certificates check

DOCUMENT No. REV DATE


Page 2 of 4
DJ-232HBW-P-AAE-QC-MST-6006 00 05- 12 – 2018
Mai Dubai Factory Extension
DOCUMENT NO. REV. NO. DATE:
Page 1 of 2
DJ-232HBW-P-AAE-QC-MST-6006 00 05-12-2018
INSPECTION AND TEST PLAN FOR TESTING AND COMMISIONING OF STAT-X AEROSOL SUPPRESSION SYSTEM

Verification By

Contractor

Contractor

Consultant
ITP

Client
Main
Sub-
Activity Description Reference Documents Acceptance Criteria Inspection Record Responsibility
Code

1.0 DOCUMENT REVIEW


 Project Specification-Tender
Submission Section 6 –Fire
Alarm system
.
1.1  Project Specification  Sample and product data  Work Inspection Project Engineer & -
Testing & Commissioning of R R H
 Technical Submittal Sheet Confirming the Record QA/QC Engineer
STAT-X System
standard of material quality
& Manufacturer installation
Recommendation
 Obtain the site Clearance
from the engineer from civil
1.2
Preparation of site to carry out the  As per Approved Site Engineer/
F1 S -
Activity and safety officer to
Related Activity Method Statement Project Engineer
start the work

2.0 Preparation Activity


 As per Approved
Check the Panels generators Method Statement Visual inspection for overall
2.1 Detecting device and its accessories  Manufacturer Installation, cable termination Check List Comm Engineer R F1 W -
Are ready for commissioning instructions Detectors installation

 Manufacturers QA/QC Engineer/


Every material deliver at Recommendation - Project Engineer
2.2 Product storage and handling R F1&W W -
site  Method Statement

3.0 Installation
- Safety Engineer/
3.1 Safety Clearness Every activities  Project Safety Plan R F1&W - -
Project Engineer
Consultant Logo Client Logo

Consultant Client Contractor


Amana Steel Buildings
Consultant Name Client Name
Contracting L.L.C.

 Project Specification
Installation of above and below grade  Manufacturer’s
-
3.2 drainage, storm water pipe & fitting Every job completion Recommendation Project Engineer R F1&W W -
sleeve  Approved Method Statement
 Approved Shop Drawings

4.0 Inspections
 Project Specification
Inspection for above and below grade  Manufacturer’s Project Engineer /
4.1 drainage, storm water pipe & fitting Every job completion Recommendation Inspection Request F1 F1 W W
QA&QC Engineer
sleeve  Approved Method Statement
 Approved Shop Drawings

DOCUMENT No. REV DATE


Page 2 of 4
DJ-232HBW-P-AAE-QC-MST-6006 00 05- 12 – 2018