Indicator Reference Rev FullReference

KAIG3-RFI-TG-A-1408 00 KAIG3-RFI-TG-A-1408-00
KAIG3-RFI-TT-E-0764 00 KAIG3-RFI-TT-E-0764-00
KAIG3-RFI-SW-E-0789 00 KAIG3-RFI-SW-E-0789-00
KAIG3-RFI-WG-E-0788 00 KAIG3-RFI-WG-E-0788-00
KAIG3-RFI-NA-E-0786 00 KAIG3-RFI-NA-E-0786-00
KAIG3-RFI-SW-C-10317 00 KAIG3-RFI-SW-C-10317-00
KAIG3-RFI-RD-C-10321 00 KAIG3-RFI-RD-C-10321-00
KAIG3-RFI-SW-C-10315 00 KAIG3-RFI-SW-C-10315-00
KAIG3-RFI-SW-C-10316 00 KAIG3-RFI-SW-C-10316-00
KAIG3-RFI-SW-C-10320 00 KAIG3-RFI-SW-C-10320-00
KAIG3-RFI-SW-C-10322 00 KAIG3-RFI-SW-C-10322-00
KAIG3-RFI-SW-C-10331 00 KAIG3-RFI-SW-C-10331-00
KAIG3-RFI-SW-C-10332 00 KAIG3-RFI-SW-C-10332-00
KAIG3-RFI-SW-C-10333 00 KAIG3-RFI-SW-C-10333-00
KAIG3-RFI-SW-C-10334 00 KAIG3-RFI-SW-C-10334-00
KAIG3-RFI-SW-C-10335 00 KAIG3-RFI-SW-C-10335-00
KAIG3-RFI-SW-C-10345 00 KAIG3-RFI-SW-C-10345-00
KAIG3-RFI-SW-LS-1917 00 KAIG3-RFI-SW-LS-1917-00
KAIG3-RFI-SW-LS-1918 00 KAIG3-RFI-SW-LS-1918-00
KAIG3-RFI-SW-LS-1919 00 KAIG3-RFI-SW-LS-1919-00
KAIG3-RFI-SW-LS-1920 00 KAIG3-RFI-SW-LS-1920-00
KAIG3-RFI-SW-LS-1921 00 KAIG3-RFI-SW-LS-1921-00
KAIG3-RFI-SW-LS-1922 00 KAIG3-RFI-SW-LS-1922-00
KAIG3-RFI-SW-LS-1923 00 KAIG3-RFI-SW-LS-1923-00
KAIG3-RFI-SW-LS-1924 00 KAIG3-RFI-SW-LS-1924-00
KAIG3-RFI-SW-LS-1925 00 KAIG3-RFI-SW-LS-1925-00
KAIG3-RFI-SW-LS-1926 00 KAIG3-RFI-SW-LS-1926-00
KAIG3-RFI-SW-LS-1927 00 KAIG3-RFI-SW-LS-1927-00
KAIG3-RFI-SW-LS-1928 00 KAIG3-RFI-SW-LS-1928-00
KAIG3-RFI-SW-LS-1929 00 KAIG3-RFI-SW-LS-1929-00
KAIG3-RFI-SW-C-10367 00 KAIG3-RFI-SW-C-10367-00
KAIG3-RFI-SW-LS-1930 00 KAIG3-RFI-SW-LS-1930-00
KAIG3-RFI-SW-C-10366 00 KAIG3-RFI-SW-C-10366-00
KAIG3-RFI-SW-LS-1931 00 KAIG3-RFI-SW-LS-1931-00
KAIG3-RFI-SW-LS-1932 00 KAIG3-RFI-SW-LS-1932-00
KAIG3-RFI-SW-LS-1933 00 KAIG3-RFI-SW-LS-1933-00
KAIG3-RFI-SW-LS-1934 00 KAIG3-RFI-SW-LS-1934-00
KAIG3-RFI-SW-LS-1935 00 KAIG3-RFI-SW-LS-1935-00
KAIG3-RFI-SW-LS-1936 00 KAIG3-RFI-SW-LS-1936-00
KAIG3-RFI-SW-C-10309 00 KAIG3-RFI-SW-C-10309-00
KAIG3-RFI-SW-C-5208 01 KAIG3-RFI-SW-C-5208-01
KAIG3-RFI-SW-C-5319 01 KAIG3-RFI-SW-C-5319-01
KAIG3-RFI-SW-C-8980 01 KAIG3-RFI-SW-C-8980-01
KAIG3-RFI-SW-C-9039 01 KAIG3-RFI-SW-C-9039-01
KAIG3-RFI-SW-C-9198 01 KAIG3-RFI-SW-C-9198-01
KAIG3-RFI-SW-C-9883 01 KAIG3-RFI-SW-C-9883-01
KAIG3-RFI-SW-C-10063 01 KAIG3-RFI-SW-C-10063-01
KAIG3-RFI-SW-C-10271 00 KAIG3-RFI-SW-C-10271-00
KAIG3-RFI-SW-C-10272 00 KAIG3-RFI-SW-C-10272-00
KAIG3-RFI-SW-C-10274 00 KAIG3-RFI-SW-C-10274-00
KAIG3-RFI-CC-S-11262 00 KAIG3-RFI-CC-S-11262-00
KAIG3-RFI-NA-S-11230 00 KAIG3-RFI-NA-S-11230-00
KAIG3-RFI-CF-S-11255 00 KAIG3-RFI-CF-S-11255-00
KAIG3-RFI-PC-S-11222 00 KAIG3-RFI-PC-S-11222-00
KAIG3-RFI-EC-S-11215 00 KAIG3-RFI-EC-S-11215-00
KAIG3-RFI-CO-S-11209 00 KAIG3-RFI-CO-S-11209-00
KAIG3-RFI-EC-S-11217 00 KAIG3-RFI-EC-S-11217-00
KAIG3-RFI-EC-S-11216 00 KAIG3-RFI-EC-S-11216-00
KAIG3-RFI-EC-S-11219 00 KAIG3-RFI-EC-S-11219-00
KAIG3-RFI-EC-S-11218 00 KAIG3-RFI-EC-S-11218-00
KAIG3-RFI-CO-S-11208 00 KAIG3-RFI-CO-S-11208-00
KAIG3-RFI-CO-C-10256 00 KAIG3-RFI-CO-C-10256-00
KAIG3-RFI-CO-C-10255 00 KAIG3-RFI-CO-C-10255-00
KAIG3-RFI-MC-C-10254 00 KAIG3-RFI-MC-C-10254-00
KAIG3-RFI-EC-SU-03600 00 KAIG3-RFI-EC-SU-03600-00
KAIG3-RFI-EC-SU-03602 00 KAIG3-RFI-EC-SU-03602-00
KAIG3-RFI-CO-SU-03596 00 KAIG3-RFI-CO-SU-03596-00
KAIG3-RFI-EC-SU-03598 00 KAIG3-RFI-EC-SU-03598-00
KAIG3-RFI-EC-SU-03601 00 KAIG3-RFI-EC-SU-03601-00
KAIG3-RFI-MC-SU-03589 00 KAIG3-RFI-MC-SU-03589-00
KAIG3-RFI-EC-SS-00462 00 KAIG3-RFI-EC-SS-00462-00
KAIG3-RFI-WG-C-10384 00 KAIG3-RFI-WG-C-10384-00
KAIG3-RFI-WG-C-10383 00 KAIG3-RFI-WG-C-10383-00
KAIG3-RFI-WG-C-10382 00 KAIG3-RFI-WG-C-10382-00
KAIG3-RFI-PG-C-10381 00 KAIG3-RFI-PG-C-10381-00
KAIG3-RFI-CG-C-10241 00 KAIG3-RFI-CG-C-10241-00
KAIG3-RFI-CO-C-10232 00 KAIG3-RFI-CO-C-10232-00
KAIG3-RFI-CO-C-10210 00 KAIG3-RFI-CO-C-10210-00
KAIG3-RFI-WG-C-10361 00 KAIG3-RFI-WG-C-10361-00
KAIG3-RFI-TT-S-11310 00 KAIG3-RFI-TT-S-11310-00
KAIG3-RFI-MB-S-11188 01 KAIG3-RFI-MB-S-11188-01
KAIG3-RFI-AG-S-11304 00 KAIG3-RFI-AG-S-11304-00
KAIG3-RFI-TT-SU-3627 00 KAIG3-RFI-TT-SU-3627-00
KAIG3-RFI-MB-SU-3558 01 KAIG3-RFI-MB-SU-3558-01
KAIG3-RFI-AG-SU-3625 00 KAIG3-RFI-AG-SU-3625-00
KAIG3-RFI-CO-S-11203 00 KAIG3-RFI-CO-S-11203-00
KAIG3-RFI-CF-S-11129 00 KAIG3-RFI-CF-S-11129-00
KAIG3-RFI-SW-E-0787 00 KAIG3-RFI-SW-E-0787-00
KAIG3-RFI-SW-E-0543 01 KAIG3-RFI-SW-E-0543-01
KAIG3-RFI-PG-C-10337 00 KAIG3-RFI-PG-C-10337-00
KAIG3-RFI-TB-C-10336 00 KAIG3-RFI-TB-C-10336-00
KAIG3-RFI-AG-S-11236 00 KAIG3-RFI-AG-S-11236-00
KAIG3-RFI-AG-SU-3607 00 KAIG3-RFI-AG-SU-3607-00
KAIG3-RFI-SW-E-0542 01 KAIG3-RFI-SW-E-0542-01
KAIG3-RFI-TT-S-11295 00 KAIG3-RFI-TT-S-11295-00
KAIG3-RFI-TG-C-10343 00 KAIG3-RFI-TG-C-10343-00
KAIG3-RFI-PG-C-10339 00 KAIG3-RFI-PG-C-10339-00
KAIG3-RFI-WG-C-10338 00 KAIG3-RFI-WG-C-10338-00
KAIG3-RFI-DG-LS-1916 00 KAIG3-RFI-DG-LS-1916-00
KAIG3-RFI-CF-LC-1030 00 KAIG3-RFI-CF-LC-1030-00
KAIG3-RFI-SW-LC-1024 00 KAIG3-RFI-SW-LC-1024-00
KAIG3-RFI-SW-LC-1023 00 KAIG3-RFI-SW-LC-1023-00
KAIG3-RFI-SW-LC-1022 00 KAIG3-RFI-SW-LC-1022-00
KAIG3-RFI-SW-LC-1021 00 KAIG3-RFI-SW-LC-1021-00
KAIG3-RFI-NA-A-01406 00 KAIG3-RFI-NA-A-01406-00
KAIG3-RFI-CF-SU-03620 00 KAIG3-RFI-CF-SU-03620-00
KAIG3-RFI-CO-S-11288 00 KAIG3-RFI-CO-S-11288-00
KAIG3-RFI-CO-SU-03619 00 KAIG3-RFI-CO-SU-03619-00
KAIG3-RFI-CO-S-11287 00 KAIG3-RFI-CO-S-11287-00
KAIG3-RFI-CO-S-11286 00 KAIG3-RFI-CO-S-11286-00
KAIG3-RFI-CO-C-10340 00 KAIG3-RFI-CO-C-10340-00
KAIG3-RFI-PC-SU-03612 00 KAIG3-RFI-PC-SU-03612-00
KAIG3-RFI-EC-SU-03617 00 KAIG3-RFI-EC-SU-03617-00
KAIG3-RFI-EC-S-11283 00 KAIG3-RFI-EC-S-11283-00
KAIG3-RFI-EC-SU-03616 00 KAIG3-RFI-EC-SU-03616-00
KAIG3-RFI-PG-C-10342 00 KAIG3-RFI-PG-C-10342-00
KAIG3-RFI-EC-S-11282 00 KAIG3-RFI-EC-S-11282-00
KAIG3-RFI-CO-S-11277 00 KAIG3-RFI-CO-S-11277-00
KAIG3-RFI-CO-S-11272 00 KAIG3-RFI-CO-S-11272-00
KAIG3-RFI-SW-C-10275 00 KAIG3-RFI-SW-C-10275-00
KAIG3-RFI-SW-C-10305 00 KAIG3-RFI-SW-C-10305-00
KAIG3-RFI-SW-C-10306 00 KAIG3-RFI-SW-C-10306-00
KAIG3-RFI-SW-C-10307 00 KAIG3-RFI-SW-C-10307-00
KAIG3-RFI-SW-C-10308 00 KAIG3-RFI-SW-C-10308-00
KAIG3-RFI-SW-C-10313 00 KAIG3-RFI-SW-C-10313-00
KAIG3-RFI-SW-C-10314 00 KAIG3-RFI-SW-C-10314-00
KAIG3-RFI-SW-C-10318 00 KAIG3-RFI-SW-C-10318-00
KAIG3-RFI-SW-C-10319 00 KAIG3-RFI-SW-C-10319-00
KAIG3-RFI-SW-C-10234 00 KAIG3-RFI-SW-C-10234-00
KAIG3-RFI-SW-C-10217 00 KAIG3-RFI-SW-C-10217-00
KAIG3-RFI-EC-S-11201 00 KAIG3-RFI-EC-S-11201-00
KAIG3-RFI-TT-LC-1020 00 KAIG3-RFI-TT-LC-1020-00
KAIG3-RFI-TT-LC-1019 00 KAIG3-RFI-TT-LC-1019-00
KAIG3-RFI-TT-LC-1018 00 KAIG3-RFI-TT-LC-1018-00
KAIG3-RFI-FC-LC-1017 00 KAIG3-RFI-FC-LC-1017-00
KAIG3-RFI-PT-LC-1016 00 KAIG3-RFI-PT-LC-1016-00
KAIG3-RFI-NA-LC-1015 00 KAIG3-RFI-NA-LC-1015-00
KAIG3-RFI-SW-M-0461 00 KAIG3-RFI-SW-M-0461-00
KAIG3-RFI-SW-P-0421 01 KAIG3-RFI-SW-P-0421-01
KAIG3-RFI-CO-A-1407 00 KAIG3-RFI-CO-A-1407-00
KAIG3-RFI-CO-A-1405 00 KAIG3-RFI-CO-A-1405-00
KAIG3-RFI-CO-A-1404 00 KAIG3-RFI-CO-A-1404-00
KAIG3-RFI-CO-A-1403 00 KAIG3-RFI-CO-A-1403-00
KAIG3-RFI-CO-S-11276 00 KAIG3-RFI-CO-S-11276-00
KAIG3-RFI-CO-S-11275 00 KAIG3-RFI-CO-S-11275-00
KAIG3-RFI-CO-S-11259 00 KAIG3-RFI-CO-S-11259-00
KAIG3-RFI-CO-S-11258 00 KAIG3-RFI-CO-S-11258-00
KAIG3-RFI-CO-S-11271 00 KAIG3-RFI-CO-S-11271-00
KAIG3-RFI-CO-SU-03615 00 KAIG3-RFI-CO-SU-03615-00
KAIG3-RFI-NA-S-11270 00 KAIG3-RFI-NA-S-11270-00
KAIG3-RFI-NA-S-11269 00 KAIG3-RFI-NA-S-11269-00
KAIG3-RFI-NA-S-11268 00 KAIG3-RFI-NA-S-11268-00
KAIG3-RFI-CO-S-11257 00 KAIG3-RFI-CO-S-11257-00
KAIG3-RFI-SA-S-11261 00 KAIG3-RFI-SA-S-11261-00
KAIG3-RFI-SA-S-11256 00 KAIG3-RFI-SA-S-11256-00
KAIG3-RFI-CO-SU-03590 00 KAIG3-RFI-CO-SU-03590-00
KAIG3-RFI-SW-E-0785 00 KAIG3-RFI-SW-E-0785-00
KAIG3-RFI-SW-E-0784 00 KAIG3-RFI-SW-E-0784-00
KAIG3-RFI-NA-E-0783 00 KAIG3-RFI-NA-E-0783-00
KAIG3-RFI-SW-LC-0986 01 KAIG3-RFI-SW-LC-0986-01
KAIG3-RFI-SW-LC-0985 01 KAIG3-RFI-SW-LC-0985-01
KAIG3-RFI-SW-LC-0984 01 KAIG3-RFI-SW-LC-0984-01
KAIG3-RFI-SW-LC-0983 01 KAIG3-RFI-SW-LC-0983-01
KAIG3-RFI-TB-C-10310 00 KAIG3-RFI-TB-C-10310-00
KAIG3-RFI-WG-C-10304 00 KAIG3-RFI-WG-C-10304-00
KAIG3-RFI-WG-C-10303 00 KAIG3-RFI-WG-C-10303-00
KAIG3-RFI-WG-C-10302 00 KAIG3-RFI-WG-C-10302-00
KAIG3-RFI-WG-S-10890 01 KAIG3-RFI-WG-S-10890-01
KAIG3-RFI-WG-S-10860 01 KAIG3-RFI-WG-S-10860-01
KAIG3-RFI-SW-LC-1009 00 KAIG3-RFI-SW-LC-1009-00
KAIG3-RFI-SW-LC-1008 00 KAIG3-RFI-SW-LC-1008-00
KAIG3-RFI-SW-LC-1007 00 KAIG3-RFI-SW-LC-1007-00
KAIG3-RFI-SW-LC-1002 00 KAIG3-RFI-SW-LC-1002-00
KAIG3-RFI-SW-LC-0999 00 KAIG3-RFI-SW-LC-0999-00
KAIG3-RFI-SW-P-0460 00 KAIG3-RFI-SW-P-0460-00
KAIG3-RFI-SW-P-0459 00 KAIG3-RFI-SW-P-0459-00
KAIG3-RFI-SW-LS-1906 01 KAIG3-RFI-SW-LS-1906-01
KAIG3-RFI-SW-C-10301 00 KAIG3-RFI-SW-C-10301-00
KAIG3-RFI-SW-C-10300 00 KAIG3-RFI-SW-C-10300-00
KAIG3-RFI-SW-C-10216 00 KAIG3-RFI-SW-C-10216-00
KAIG3-RFI-SW-C-10218 00 KAIG3-RFI-SW-C-10218-00
KAIG3-RFI-SW-C-10243 01 KAIG3-RFI-SW-C-10243-01
KAIG3-RFI-SA-SU-03614 00 KAIG3-RFI-SA-SU-03614-00
KAIG3-RFI-SA-S-11260 00 KAIG3-RFI-SA-S-11260-00
KAIG3-RFI-SW-C-10270 00 KAIG3-RFI-SW-C-10270-00
KAIG3-RFI-SW-C-10273 00 KAIG3-RFI-SW-C-10273-00
KAIG3-RFI-SW-C-10291 00 KAIG3-RFI-SW-C-10291-00
KAIG3-RFI-PG-C-10296 00 KAIG3-RFI-PG-C-10296-00
KAIG3-RFI-SW-C-10292 00 KAIG3-RFI-SW-C-10292-00
KAIG3-RFI-PG-C-10295 00 KAIG3-RFI-PG-C-10295-00
KAIG3-RFI-WG-SU-3584 01 KAIG3-RFI-WG-SU-3584-01
KAIG3-RFI-SW-C-10293 00 KAIG3-RFI-SW-C-10293-00
KAIG3-RFI-WG-SU-3583 01 KAIG3-RFI-WG-SU-3583-01
KAIG3-RFI-SW-C-10188 00 KAIG3-RFI-SW-C-10188-00
KAIG3-RFI-SW-C-10294 00 KAIG3-RFI-SW-C-10294-00
KAIG3-RFI-TT-SU-3606 00 KAIG3-RFI-TT-SU-3606-00
KAIG3-RFI-TG-S-11254 00 KAIG3-RFI-TG-S-11254-00
KAIG3-RFI-TT-S-11232 00 KAIG3-RFI-TT-S-11232-00
KAIG3-RFI-AG-S-11235 00 KAIG3-RFI-AG-S-11235-00
KAIG3-RFI-SW-C-10290 00 KAIG3-RFI-SW-C-10290-00
KAIG3-RFI-SW-C-10281 00 KAIG3-RFI-SW-C-10281-00
KAIG3-RFI-SW-C-10280 00 KAIG3-RFI-SW-C-10280-00
KAIG3-RFI-SW-C-10279 00 KAIG3-RFI-SW-C-10279-00
KAIG3-RFI-SW-C-10278 00 KAIG3-RFI-SW-C-10278-00
KAIG3-RFI-SW-C-10277 00 KAIG3-RFI-SW-C-10277-00
KAIG3-RFI-SW-C-10276 00 KAIG3-RFI-SW-C-10276-00
KAIG3-RFI-SW-C-9235 01 KAIG3-RFI-SW-C-9235-01
KAIG3-RFI-SW-C-10269 00 KAIG3-RFI-SW-C-10269-00
KAIG3-RFI-SW-C-10268 00 KAIG3-RFI-SW-C-10268-00
KAIG3-RFI-SW-C-10267 00 KAIG3-RFI-SW-C-10267-00
KAIG3-RFI-SW-C-10266 00 KAIG3-RFI-SW-C-10266-00
KAIG3-RFI-SW-C-10265 00 KAIG3-RFI-SW-C-10265-00
KAIG3-RFI-SW-C-10264 00 KAIG3-RFI-SW-C-10264-00
KAIG3-RFI-SW-C-10263 00 KAIG3-RFI-SW-C-10263-00
KAIG3-RFI-SW-C-10262 00 KAIG3-RFI-SW-C-10262-00
KAIG3-RFI-SW-C-10230 00 KAIG3-RFI-SW-C-10230-00
KAIG3-RFI-SW-C-10215 00 KAIG3-RFI-SW-C-10215-00
KAIG3-RFI-RD-C-10186 01 KAIG3-RFI-RD-C-10186-01
KAIG3-RFI-PA-C-8908 01 KAIG3-RFI-PA-C-8908-01
KAIG3-RFI-PA-C-8907 01 KAIG3-RFI-PA-C-8907-01
KAIG3-RFI-CC-E-0780 00 KAIG3-RFI-CC-E-0780-00
KAIG3-RFI-CC-E-0779 00 KAIG3-RFI-CC-E-0779-00
KAIG3-RFI-SW-LC-1014 00 KAIG3-RFI-SW-LC-1014-00
KAIG3-RFI-SW-LC-1013 00 KAIG3-RFI-SW-LC-1013-00
KAIG3-RFI-SW-LC-1012 00 KAIG3-RFI-SW-LC-1012-00
KAIG3-RFI-SW-LC-1011 00 KAIG3-RFI-SW-LC-1011-00
KAIG3-RFI-SW-E-0782 00 KAIG3-RFI-SW-E-0782-00
KAIG3-RFI-SW-E-0781 00 KAIG3-RFI-SW-E-0781-00
KAIG3-RFI-SW-E-0742 01 KAIG3-RFI-SW-E-0742-01
KAIG3-RFI-CC-SS-00463 00 KAIG3-RFI-CC-SS-00463-00
KAIG3-RFI-CO-C-10297 00 KAIG3-RFI-CO-C-10297-00
KAIG3-RFI-CO-S-11243 00 KAIG3-RFI-CO-S-11243-00
KAIG3-RFI-CO-S-11244 00 KAIG3-RFI-CO-S-11244-00
KAIG3-RFI-CO-S-11245 00 KAIG3-RFI-CO-S-11245-00
KAIG3-RFI-CO-S-11246 00 KAIG3-RFI-CO-S-11246-00
KAIG3-RFI-CO-S-11251 00 KAIG3-RFI-CO-S-11251-00
KAIG3-RFI-CO-S-11252 00 KAIG3-RFI-CO-S-11252-00
KAIG3-RFI-MC-C-10260 00 KAIG3-RFI-MC-C-10260-00
KAIG3-RFI-MC-C-10261 00 KAIG3-RFI-MC-C-10261-00
KAIG3-RFI-SW-M-0458 00 KAIG3-RFI-SW-M-0458-00
KAIG3-RFI-SW-M-0457 00 KAIG3-RFI-SW-M-0457-00
KAIG3-RFI-SW-C-10299 00 KAIG3-RFI-SW-C-10299-00
KAIG3-RFI-SW-C-10298 00 KAIG3-RFI-SW-C-10298-00
KAIG3-RFI-SW-C-10289 00 KAIG3-RFI-SW-C-10289-00
KAIG3-RFI-SW-C-10283 00 KAIG3-RFI-SW-C-10283-00
KAIG3-RFI-SW-C-10288 00 KAIG3-RFI-SW-C-10288-00
KAIG3-RFI-SW-C-10282 00 KAIG3-RFI-SW-C-10282-00
KAIG3-RFI-SW-C-10287 00 KAIG3-RFI-SW-C-10287-00
KAIG3-RFI-SW-C-10285 00 KAIG3-RFI-SW-C-10285-00
KAIG3-RFI-SW-C-10286 00 KAIG3-RFI-SW-C-10286-00
KAIG3-RFI-SW-C-10284 00 KAIG3-RFI-SW-C-10284-00
KAIG3-RFI-CO-SU-03608 00 KAIG3-RFI-CO-SU-03608-00
KAIG3-RFI-CO-S-11239 00 KAIG3-RFI-CO-S-11239-00
KAIG3-RFI-CO-SU-03611 00 KAIG3-RFI-CO-SU-03611-00
KAIG3-RFI-CO-S-11250 00 KAIG3-RFI-CO-S-11250-00
KAIG3-RFI-CO-S-11249 00 KAIG3-RFI-CO-S-11249-00
KAIG3-RFI-CO-S-11248 00 KAIG3-RFI-CO-S-11248-00
KAIG3-RFI-CO-S-11247 00 KAIG3-RFI-CO-S-11247-00
KAIG3-RFI-CO-S-11238 00 KAIG3-RFI-CO-S-11238-00
KAIG3-RFI-CO-S-11237 00 KAIG3-RFI-CO-S-11237-00
KAIG3-RFI-CO-S-11214 00 KAIG3-RFI-CO-S-11214-00
KAIG3-RFI-SW-C-10219 00 KAIG3-RFI-SW-C-10219-00
KAIG3-RFI-SW-C-9999 01 KAIG3-RFI-SW-C-9999-01
KAIG3-RFI-SW-C-9997 01 KAIG3-RFI-SW-C-9997-01
KAIG3-RFI-MC-SU-03575 00 KAIG3-RFI-MC-SU-03575-00
KAIG3-RFI-GC-LC-0954 01 KAIG3-RFI-GC-LC-0954-01
KAIG3-RFI-GC-LC-0953 01 KAIG3-RFI-GC-LC-0953-01
KAIG3-RFI-SA-LC-1010 00 KAIG3-RFI-SA-LC-1010-00
KAIG3-RFI-DG-C-10259 00 KAIG3-RFI-DG-C-10259-00
KAIG3-RFI-PG-C-10258 00 KAIG3-RFI-PG-C-10258-00
KAIG3-RFI-FC-A-1402 00 KAIG3-RFI-FC-A-1402-00
KAIG3-RFI-TG-S-11233 00 KAIG3-RFI-TG-S-11233-00
KAIG3-RFI-SW-C-10224 00 KAIG3-RFI-SW-C-10224-00
KAIG3-RFI-SW-C-10225 00 KAIG3-RFI-SW-C-10225-00
KAIG3-RFI-SW-C-10226 00 KAIG3-RFI-SW-C-10226-00
KAIG3-RFI-SW-C-10227 00 KAIG3-RFI-SW-C-10227-00
KAIG3-RFI-SW-C-10228 00 KAIG3-RFI-SW-C-10228-00
KAIG3-RFI-SW-C-10229 00 KAIG3-RFI-SW-C-10229-00
KAIG3-RFI-SW-LS-1915 00 KAIG3-RFI-SW-LS-1915-00
KAIG3-RFI-SW-C-10253 00 KAIG3-RFI-SW-C-10253-00
KAIG3-RFI-SW-C-10252 00 KAIG3-RFI-SW-C-10252-00
KAIG3-RFI-SW-LS-1908 00 KAIG3-RFI-SW-LS-1908-00
KAIG3-RFI-SA-S-11164 00 KAIG3-RFI-SA-S-11164-00
KAIG3-RFI-CO-S-11204 00 KAIG3-RFI-CO-S-11204-00
KAIG3-RFI-PC-SU-03604 00 KAIG3-RFI-PC-SU-03604-00
KAIG3-RFI-CO-SU-03603 00 KAIG3-RFI-CO-SU-03603-00
KAIG3-RFI-CO-C-10257 00 KAIG3-RFI-CO-C-10257-00
KAIG3-RFI-PC-S-11227 00 KAIG3-RFI-PC-S-11227-00
KAIG3-RFI-CO-S-11225 00 KAIG3-RFI-CO-S-11225-00
KAIG3-RFI-CO-S-11226 00 KAIG3-RFI-CO-S-11226-00
KAIG3-RFI-CF-S-11234 00 KAIG3-RFI-CF-S-11234-00
KAIG3-RFI-CO-S-11224 00 KAIG3-RFI-CO-S-11224-00
KAIG3-RFI-CO-S-11223 00 KAIG3-RFI-CO-S-11223-00
KAIG3-RFI-NA-S-11229 00 KAIG3-RFI-NA-S-11229-00
KAIG3-RFI-PC-S-11228 00 KAIG3-RFI-PC-S-11228-00
KAIG3-RFI-EC-S-11200 00 KAIG3-RFI-EC-S-11200-00
KAIG3-RFI-MC-C-10007 00 KAIG3-RFI-MC-C-10007-00
KAIG3-RFI-TT-S-11221 00 KAIG3-RFI-TT-S-11221-00
KAIG3-RFI-PG-C-10251 00 KAIG3-RFI-PG-C-10251-00
KAIG3-RFI-TG-C-10250 00 KAIG3-RFI-TG-C-10250-00
KAIG3-RFI-WG-C-10249 00 KAIG3-RFI-WG-C-10249-00
KAIG3-RFI-DG-C-10248 00 KAIG3-RFI-DG-C-10248-00
KAIG3-RFI-TB-C-10247 00 KAIG3-RFI-TB-C-10247-00
KAIG3-RFI-SW-C-10207 00 KAIG3-RFI-SW-C-10207-00
KAIG3-RFI-SW-C-10206 00 KAIG3-RFI-SW-C-10206-00
KAIG3-RFI-MC-SU-03591 00 KAIG3-RFI-MC-SU-03591-00
KAIG3-RFI-TB-C-10246 00 KAIG3-RFI-TB-C-10246-00
KAIG3-RFI-MC-S-11212 00 KAIG3-RFI-MC-S-11212-00
KAIG3-RFI-MC-S-11205 00 KAIG3-RFI-MC-S-11205-00
KAIG3-RFI-CO-SU-03597 00 KAIG3-RFI-CO-SU-03597-00
KAIG3-RFI-CO-S-11211 00 KAIG3-RFI-CO-S-11211-00
KAIG3-RFI-CO-S-11210 00 KAIG3-RFI-CO-S-11210-00
KAIG3-RFI-CO-S-11153 00 KAIG3-RFI-CO-S-11153-00
KAIG3-RFI-TB-C-10240 00 KAIG3-RFI-TB-C-10240-00
KAIG3-RFI-TB-C-10239 00 KAIG3-RFI-TB-C-10239-00
KAIG3-RFI-TB-C-10238 00 KAIG3-RFI-TB-C-10238-00
KAIG3-RFI-WG-LS-1903 00 KAIG3-RFI-WG-LS-1903-00
KAIG3-RFI-TG-S-11193 00 KAIG3-RFI-TG-S-11193-00
KAIG3-RFI-TG-SU-3580 00 KAIG3-RFI-TG-SU-3580-00
KAIG3-RFI-SW-C-10193 00 KAIG3-RFI-SW-C-10193-00
KAIG3-RFI-SW-C-10220 00 KAIG3-RFI-SW-C-10220-00
KAIG3-RFI-SW-C-10221 00 KAIG3-RFI-SW-C-10221-00
KAIG3-RFI-SW-C-10222 00 KAIG3-RFI-SW-C-10222-00
KAIG3-RFI-SW-C-10223 00 KAIG3-RFI-SW-C-10223-00
KAIG3-RFI-SW-LS-01909 00 KAIG3-RFI-SW-LS-01909-00
KAIG3-RFI-SW-LS-01910 00 KAIG3-RFI-SW-LS-01910-00
KAIG3-RFI-SW-LS-01911 00 KAIG3-RFI-SW-LS-01911-00
KAIG3-RFI-SW-LS-01912 00 KAIG3-RFI-SW-LS-01912-00
KAIG3-RFI-SW-LS-01913 00 KAIG3-RFI-SW-LS-01913-00
KAIG3-RFI-SW-LS-01914 00 KAIG3-RFI-SW-LS-01914-00
KAIG3-RFI-SW-E-0660 00 KAIG3-RFI-SW-E-0660-00
KAIG3-RFI-NA-E-0778 00 KAIG3-RFI-NA-E-0778-00
KAIG3-RFI-NA-LC-1006 00 KAIG3-RFI-NA-LC-1006-00
KAIG3-RFI-SW-C-10194 00 KAIG3-RFI-SW-C-10194-00
KAIG3-RFI-SW-C-10195 00 KAIG3-RFI-SW-C-10195-00
KAIG3-RFI-SW-C-10231 00 KAIG3-RFI-SW-C-10231-00
KAIG3-RFI-SW-C-10233 00 KAIG3-RFI-SW-C-10233-00
KAIG3-RFI-SW-C-10235 00 KAIG3-RFI-SW-C-10235-00
KAIG3-RFI-SW-C-10173 00 KAIG3-RFI-SW-C-10173-00
KAIG3-RFI-SW-C-10236 00 KAIG3-RFI-SW-C-10236-00
KAIG3-RFI-SW-C-10237 00 KAIG3-RFI-SW-C-10237-00
KAIG3-RFI-SW-C-10242 00 KAIG3-RFI-SW-C-10242-00
KAIG3-RFI-SW-C-10243 00 KAIG3-RFI-SW-C-10243-00
KAIG3-RFI-SW-C-10185 00 KAIG3-RFI-SW-C-10185-00
KAIG3-RFI-CO-S-9619 00 KAIG3-RFI-CO-S-9619-00
KAIG3-RFI-NA-P-0456 00 KAIG3-RFI-NA-P-0456-00
KAIG3-RFI-SW-LS-1906 00 KAIG3-RFI-SW-LS-1906-00
KAIG3-RFI-SW-LS-1905 00 KAIG3-RFI-SW-LS-1905-00
KAIG3-RFI-SW-LS-1904 00 KAIG3-RFI-SW-LS-1904-00
KAIG3-RFI-TG-LS-1907 00 KAIG3-RFI-TG-LS-1907-00
KAIG3-RFI-PG-LC-1004 00 KAIG3-RFI-PG-LC-1004-00
KAIG3-RFI-MC-S-11197 00 KAIG3-RFI-MC-S-11197-00
KAIG3-RFI-EC-SU-03594 00 KAIG3-RFI-EC-SU-03594-00
KAIG3-RFI-EC-S-11202 00 KAIG3-RFI-EC-S-11202-00
KAIG3-RFI-CC-SU-03595 00 KAIG3-RFI-CC-SU-03595-00
KAIG3-RFI-CC-S-11206 00 KAIG3-RFI-CC-S-11206-00
KAIG3-RFI-SW-E-0775 00 KAIG3-RFI-SW-E-0775-00
KAIG3-RFI-WG-C-10212 00 KAIG3-RFI-WG-C-10212-00
KAIG3-RFI-WG-C-10211 00 KAIG3-RFI-WG-C-10211-00
KAIG3-RFI-RD-C-10186 00 KAIG3-RFI-RD-C-10186-00
KAIG3-RFI-SW-C-10174 00 KAIG3-RFI-SW-C-10174-00
KAIG3-RFI-SW-C-10179 00 KAIG3-RFI-SW-C-10179-00
KAIG3-RFI-SW-C-10180 00 KAIG3-RFI-SW-C-10180-00
KAIG3-RFI-SW-C-10181 00 KAIG3-RFI-SW-C-10181-00
KAIG3-RFI-SW-C-10182 00 KAIG3-RFI-SW-C-10182-00
KAIG3-RFI-SW-C-10183 00 KAIG3-RFI-SW-C-10183-00
KAIG3-RFI-SW-C-10184 00 KAIG3-RFI-SW-C-10184-00
KAIG3-RFI-SW-C-10187 00 KAIG3-RFI-SW-C-10187-00
KAIG3-RFI-SW-C-10189 00 KAIG3-RFI-SW-C-10189-00
KAIG3-RFI-SW-C-10190 00 KAIG3-RFI-SW-C-10190-00
KAIG3-RFI-SW-C-10191 00 KAIG3-RFI-SW-C-10191-00
KAIG3-RFI-SW-C-10192 00 KAIG3-RFI-SW-C-10192-00
KAIG3-RFI-SW-C-10196 00 KAIG3-RFI-SW-C-10196-00
KAIG3-RFI-SW-C-10197 00 KAIG3-RFI-SW-C-10197-00
KAIG3-RFI-PG-C-10209 00 KAIG3-RFI-PG-C-10209-00
KAIG3-RFI-SW-C-10198 00 KAIG3-RFI-SW-C-10198-00
KAIG3-RFI-SW-C-10199 00 KAIG3-RFI-SW-C-10199-00
KAIG3-RFI-SW-C-10200 00 KAIG3-RFI-SW-C-10200-00
KAIG3-RFI-SW-C-10204 00 KAIG3-RFI-SW-C-10204-00
KAIG3-RFI-SW-C-10205 00 KAIG3-RFI-SW-C-10205-00
KAIG3-RFI-SW-C-10213 00 KAIG3-RFI-SW-C-10213-00
KAIG3-RFI-SW-C-10214 00 KAIG3-RFI-SW-C-10214-00
KAIG3-RFI-SW-LS-1901 00 KAIG3-RFI-SW-LS-1901-00
KAIG3-RFI-PG-C-10208 00 KAIG3-RFI-PG-C-10208-00
KAIG3-RFI-WG-LS-1902 00 KAIG3-RFI-WG-LS-1902-00
KAIG3-RFI-WG-LS-1894 00 KAIG3-RFI-WG-LS-1894-00
KAIG3-RFI-TG-A-1399 00 KAIG3-RFI-TG-A-1399-00
KAIG3-RFI-AG-S-11192 00 KAIG3-RFI-AG-S-11192-00
KAIG3-RFI-TG-S-11191 00 KAIG3-RFI-TG-S-11191-00
KAIG3-RFI-TG-S-11190 00 KAIG3-RFI-TG-S-11190-00
KAIG3-RFI-TG-S-11189 00 KAIG3-RFI-TG-S-11189-00
KAIG3-RFI-MB-S-11188 00 KAIG3-RFI-MB-S-11188-00
KAIG3-RFI-CO-S-11158 00 KAIG3-RFI-CO-S-11158-00
KAIG3-RFI-SW-C-10150 00 KAIG3-RFI-SW-C-10150-00
KAIG3-RFI-SW-C-10178 00 KAIG3-RFI-SW-C-10178-00
KAIG3-RFI-SW-C-10172 00 KAIG3-RFI-SW-C-10172-00
KAIG3-RFI-SW-C-10171 00 KAIG3-RFI-SW-C-10171-00
KAIG3-RFI-CO-A-1401 00 KAIG3-RFI-CO-A-1401-00
KAIG3-RFI-NA-S-11150 00 KAIG3-RFI-NA-S-11150-00
KAIG3-RFI-CO-A-1400 00 KAIG3-RFI-CO-A-1400-00
KAIG3-RFI-CO-A-1397 00 KAIG3-RFI-CO-A-1397-00
KAIG3-RFI-MC-S-11187 00 KAIG3-RFI-MC-S-11187-00
KAIG3-RFI-MC-S-11186 00 KAIG3-RFI-MC-S-11186-00
KAIG3-RFI-CO-A-1396 00 KAIG3-RFI-CO-A-1396-00
KAIG3-RFI-SA-SU-03578 00 KAIG3-RFI-SA-SU-03578-00
KAIG3-RFI-SA-S-11194 00 KAIG3-RFI-SA-S-11194-00
KAIG3-RFI-SA-S-11163 00 KAIG3-RFI-SA-S-11163-00
KAIG3-RFI-CO-A-1395 00 KAIG3-RFI-CO-A-1395-00
KAIG3-RFI-EC-SU-03592 00 KAIG3-RFI-EC-SU-03592-00
KAIG3-RFI-CO-A-1394 00 KAIG3-RFI-CO-A-1394-00
KAIG3-RFI-CO-A-1393 00 KAIG3-RFI-CO-A-1393-00
KAIG3-RFI-EC-S-11199 00 KAIG3-RFI-EC-S-11199-00
KAIG3-RFI-EC-S-11198 00 KAIG3-RFI-EC-S-11198-00
KAIG3-RFI-CO-SU-03588 00 KAIG3-RFI-CO-SU-03588-00
KAIG3-RFI-CO-SU-03587 00 KAIG3-RFI-CO-SU-03587-00
KAIG3-RFI-CO-S-11185 00 KAIG3-RFI-CO-S-11185-00
KAIG3-RFI-CO-S-11184 00 KAIG3-RFI-CO-S-11184-00
KAIG3-RFI-CO-S-11183 00 KAIG3-RFI-CO-S-11183-00
KAIG3-RFI-CO-S-11182 00 KAIG3-RFI-CO-S-11182-00
KAIG3-RFI-CO-S-11181 00 KAIG3-RFI-CO-S-11181-00
KAIG3-RFI-SW-M-0455 00 KAIG3-RFI-SW-M-0455-00
KAIG3-RFI-SW-M-0454 00 KAIG3-RFI-SW-M-0454-00
KAIG3-RFI-CO-S-11180 00 KAIG3-RFI-CO-S-11180-00
KAIG3-RFI-CO-SU-03574 00 KAIG3-RFI-CO-SU-03574-00
KAIG3-RFI-NA-S-11149 00 KAIG3-RFI-NA-S-11149-00
KAIG3-RFI-SW-C-9994 01 KAIG3-RFI-SW-C-9994-01
KAIG3-RFI-SW-C-10145 00 KAIG3-RFI-SW-C-10145-00
KAIG3-RFI-SW-C-10146 00 KAIG3-RFI-SW-C-10146-00
KAIG3-RFI-SW-C-10147 00 KAIG3-RFI-SW-C-10147-00
KAIG3-RFI-SW-C-10148 00 KAIG3-RFI-SW-C-10148-00
KAIG3-RFI-SW-C-10149 00 KAIG3-RFI-SW-C-10149-00
KAIG3-RFI-SW-C-10156 00 KAIG3-RFI-SW-C-10156-00
KAIG3-RFI-SW-C-10167 00 KAIG3-RFI-SW-C-10167-00
KAIG3-RFI-SW-C-10170 00 KAIG3-RFI-SW-C-10170-00
KAIG3-RFI-SW-C-10175 00 KAIG3-RFI-SW-C-10175-00
KAIG3-RFI-SW-C-10176 00 KAIG3-RFI-SW-C-10176-00
KAIG3-RFI-SW-C-10177 00 KAIG3-RFI-SW-C-10177-00
KAIG3-RFI-SW-C-10203 00 KAIG3-RFI-SW-C-10203-00
KAIG3-RFI-CO-S-10435 00 KAIG3-RFI-CO-S-10435-00
KAIG3-RFI-SW-P-0448 00 KAIG3-RFI-SW-P-0448-00
KAIG3-RFI-SW-P-0447 00 KAIG3-RFI-SW-P-0447-00
KAIG3-RFI-SW-P-0446 00 KAIG3-RFI-SW-P-0446-00
KAIG3-RFI-SW-P-0445 00 KAIG3-RFI-SW-P-0445-00
KAIG3-RFI-SW-C-10012 00 KAIG3-RFI-SW-C-10012-00
KAIG3-RFI-WG-SU-3585 00 KAIG3-RFI-WG-SU-3585-00
KAIG3-RFI-WG-SU-3584 00 KAIG3-RFI-WG-SU-3584-00
KAIG3-RFI-WG-SU-3583 00 KAIG3-RFI-WG-SU-3583-00
KAIG3-RFI-PG-C-10166 00 KAIG3-RFI-PG-C-10166-00
KAIG3-RFI-TG-C-10165 00 KAIG3-RFI-TG-C-10165-00
KAIG3-RFI-WG-C-10164 00 KAIG3-RFI-WG-C-10164-00
KAIG3-RFI-WG-C-10163 00 KAIG3-RFI-WG-C-10163-00
KAIG3-RFI-FC-E-0772 00 KAIG3-RFI-FC-E-0772-00
KAIG3-RFI-WG-C-10162 00 KAIG3-RFI-WG-C-10162-00
KAIG3-RFI-WG-C-10161 00 KAIG3-RFI-WG-C-10161-00
KAIG3-RFI-WG-C-10160 00 KAIG3-RFI-WG-C-10160-00
KAIG3-RFI-TT-LC-0962 01 KAIG3-RFI-TT-LC-0962-01
KAIG3-RFI-WG-C-10159 00 KAIG3-RFI-WG-C-10159-00
KAIG3-RFI-TT-LC-0963 01 KAIG3-RFI-TT-LC-0963-01
KAIG3-RFI-TT-LC-0964 01 KAIG3-RFI-TT-LC-0964-01
KAIG3-RFI-WG-C-10158 00 KAIG3-RFI-WG-C-10158-00
KAIG3-RFI-TT-A-1398 00 KAIG3-RFI-TT-A-1398-00
KAIG3-RFI-AG-LS-1847 01 KAIG3-RFI-AG-LS-1847-01
KAIG3-RFI-PG-LS-1895 00 KAIG3-RFI-PG-LS-1895-00
KAIG3-RFI-WG-C-10157 00 KAIG3-RFI-WG-C-10157-00
KAIG3-RFI-SA-SU-03551 00 KAIG3-RFI-SA-SU-03551-00
KAIG3-RFI-PG-C-10169 00 KAIG3-RFI-PG-C-10169-00
KAIG3-RFI-PG-C-10168 00 KAIG3-RFI-PG-C-10168-00
KAIG3-RFI-SA-S-11074 00 KAIG3-RFI-SA-S-11074-00
KAIG3-RFI-SW-M-0453 00 KAIG3-RFI-SW-M-0453-00
KAIG3-RFI-CG-LC-1005 00 KAIG3-RFI-CG-LC-1005-00
KAIG3-RFI-RG-LC-1003 00 KAIG3-RFI-RG-LC-1003-00
KAIG3-RFI-WG-C-10140 00 KAIG3-RFI-WG-C-10140-00
KAIG3-RFI-DG-C-9824 01 KAIG3-RFI-DG-C-9824-01
KAIG3-RFI-WG-C-10006 01 KAIG3-RFI-WG-C-10006-01
KAIG3-RFI-WG-S-9884 01 KAIG3-RFI-WG-S-9884-01
KAIG3-RFI-WG-S-9764 01 KAIG3-RFI-WG-S-9764-01
KAIG3-RFI-WG-S-11169 00 KAIG3-RFI-WG-S-11169-00
KAIG3-RFI-PG-S-11168 00 KAIG3-RFI-PG-S-11168-00
KAIG3-RFI-PG-S-11055 01 KAIG3-RFI-PG-S-11055-01
KAIG3-RFI-TT-S-11157 00 KAIG3-RFI-TT-S-11157-00
KAIG3-RFI-TT-SU-3576 00 KAIG3-RFI-TT-SU-3576-00
KAIG3-RFI-PC-E-0773 00 KAIG3-RFI-PC-E-0773-00
KAIG3-RFI-PC-LC-1001 00 KAIG3-RFI-PC-LC-1001-00
KAIG3-RFI-GC-LC-1000 00 KAIG3-RFI-GC-LC-1000-00
KAIG3-RFI-NA-LC-0998 00 KAIG3-RFI-NA-LC-0998-00
KAIG3-RFI-SA-LC-0958 01 KAIG3-RFI-SA-LC-0958-01
KAIG3-RFI-NA-SU-03574 00 KAIG3-RFI-NA-SU-03574-00
KAIG3-RFI-CO-SU-03577 00 KAIG3-RFI-CO-SU-03577-00
KAIG3-RFI-CO-SU-03570 00 KAIG3-RFI-CO-SU-03570-00
KAIG3-RFI-CO-S-11171 00 KAIG3-RFI-CO-S-11171-00
KAIG3-RFI-CO-S-11161 00 KAIG3-RFI-CO-S-11161-00
KAIG3-RFI-CO-S-11160 00 KAIG3-RFI-CO-S-11160-00
KAIG3-RFI-NA-S-11054 00 KAIG3-RFI-NA-S-11054-00
KAIG3-RFI-NA-S-11053 00 KAIG3-RFI-NA-S-11053-00
KAIG3-RFI-NA-S-11052 00 KAIG3-RFI-NA-S-11052-00
KAIG3-RFI-CO-SU-03586 00 KAIG3-RFI-CO-SU-03586-00
KAIG3-RFI-CO-SU-03582 00 KAIG3-RFI-CO-SU-03582-00
KAIG3-RFI-CO-SU-03581 00 KAIG3-RFI-CO-SU-03581-00
KAIG3-RFI-CO-S-11179 00 KAIG3-RFI-CO-S-11179-00
KAIG3-RFI-CO-S-11178 00 KAIG3-RFI-CO-S-11178-00
KAIG3-RFI-CO-S-11177 00 KAIG3-RFI-CO-S-11177-00
KAIG3-RFI-CO-S-11176 00 KAIG3-RFI-CO-S-11176-00
KAIG3-RFI-CO-S-11175 00 KAIG3-RFI-CO-S-11175-00
KAIG3-RFI-CO-S-11174 00 KAIG3-RFI-CO-S-11174-00
KAIG3-RFI-CO-S-11173 00 KAIG3-RFI-CO-S-11173-00
KAIG3-RFI-CO-S-11172 00 KAIG3-RFI-CO-S-11172-00
KAIG3-RFI-CO-C-10154 00 KAIG3-RFI-CO-C-10154-00
KAIG3-RFI-CG-C-10155 00 KAIG3-RFI-CG-C-10155-00
KAIG3-RFI-CO-SU-03573 00 KAIG3-RFI-CO-SU-03573-00
KAIG3-RFI-CO-SU-03572 00 KAIG3-RFI-CO-SU-03572-00
KAIG3-RFI-EC-S-11134 00 KAIG3-RFI-EC-S-11134-00
KAIG3-RFI-SA-P-0437 00 KAIG3-RFI-SA-P-0437-00
KAIG3-RFI-CG-C-10138 00 KAIG3-RFI-CG-C-10138-00
KAIG3-RFI-SW-M-0452 00 KAIG3-RFI-SW-M-0452-00
KAIG3-RFI-SW-M-0451 00 KAIG3-RFI-SW-M-0451-00
KAIG3-RFI-SW-M-0450 00 KAIG3-RFI-SW-M-0450-00
KAIG3-RFI-CO-S-11159 00 KAIG3-RFI-CO-S-11159-00
KAIG3-RFI-SA-S-11051 00 KAIG3-RFI-SA-S-11051-00
KAIG3-RFI-SW-C-10144 00 KAIG3-RFI-SW-C-10144-00
KAIG3-RFI-SW-LS-1897 00 KAIG3-RFI-SW-LS-1897-00
KAIG3-RFI-SW-C-10153 00 KAIG3-RFI-SW-C-10153-00
KAIG3-RFI-CC-P-0449 00 KAIG3-RFI-CC-P-0449-00
KAIG3-RFI-PG-A-1377 01 KAIG3-RFI-PG-A-1377-01
KAIG3-RFI-TB-C-10137 00 KAIG3-RFI-TB-C-10137-00
KAIG3-RFI-SW-C-10142 00 KAIG3-RFI-SW-C-10142-00
KAIG3-RFI-SW-C-10143 00 KAIG3-RFI-SW-C-10143-00
KAIG3-RFI-SW-LS-1900 00 KAIG3-RFI-SW-LS-1900-00
KAIG3-RFI-SW-LS-1899 00 KAIG3-RFI-SW-LS-1899-00
KAIG3-RFI-SW-LS-1898 00 KAIG3-RFI-SW-LS-1898-00
KAIG3-RFI-NA-LC-0997 00 KAIG3-RFI-NA-LC-0997-00
KAIG3-RFI-SW-C-10202 00 KAIG3-RFI-SW-C-10202-00
KAIG3-RFI-SW-C-10201 00 KAIG3-RFI-SW-C-10201-00
KAIG3-RFI-SW-C-10141 00 KAIG3-RFI-SW-C-10141-00
KAIG3-RFI-CO-SU-03579 00 KAIG3-RFI-CO-SU-03579-00
KAIG3-RFI-SW-C-10135 00 KAIG3-RFI-SW-C-10135-00
KAIG3-RFI-CO-S-11167 00 KAIG3-RFI-CO-S-11167-00
KAIG3-RFI-TT-E-0765 00 KAIG3-RFI-TT-E-0765-00
KAIG3-RFI-CO-S-11166 00 KAIG3-RFI-CO-S-11166-00
KAIG3-RFI-SW-C-10134 00 KAIG3-RFI-SW-C-10134-00
KAIG3-RFI-MC-S-11156 00 KAIG3-RFI-MC-S-11156-00
KAIG3-RFI-SW-C-10133 00 KAIG3-RFI-SW-C-10133-00
KAIG3-RFI-MC-S-11155 00 KAIG3-RFI-MC-S-11155-00
KAIG3-RFI-MC-S-11154 00 KAIG3-RFI-MC-S-11154-00
KAIG3-RFI-SW-C-10132 00 KAIG3-RFI-SW-C-10132-00
KAIG3-RFI-SW-E-0763 00 KAIG3-RFI-SW-E-0763-00
KAIG3-RFI-EC-S-11170 00 KAIG3-RFI-EC-S-11170-00
KAIG3-RFI-SW-C-10131 00 KAIG3-RFI-SW-C-10131-00
KAIG3-RFI-SW-E-0762 00 KAIG3-RFI-SW-E-0762-00
KAIG3-RFI-SW-C-10130 00 KAIG3-RFI-SW-C-10130-00
KAIG3-RFI-SW-C-10129 00 KAIG3-RFI-SW-C-10129-00
KAIG3-RFI-CO-S-11152 00 KAIG3-RFI-CO-S-11152-00
KAIG3-RFI-SW-C-10128 00 KAIG3-RFI-SW-C-10128-00
KAIG3-RFI-CO-C-10152 00 KAIG3-RFI-CO-C-10152-00
KAIG3-RFI-CO-C-10151 00 KAIG3-RFI-CO-C-10151-00
KAIG3-RFI-SW-C-10127 00 KAIG3-RFI-SW-C-10127-00
KAIG3-RFI-CG-C-10139 00 KAIG3-RFI-CG-C-10139-00
KAIG3-RFI-SW-C-10126 00 KAIG3-RFI-SW-C-10126-00
KAIG3-RFI-SW-LS-1896 00 KAIG3-RFI-SW-LS-1896-00
KAIG3-RFI-TG-A-1373 00 KAIG3-RFI-TG-A-1373-00
KAIG3-RFI-SW-C-10125 00 KAIG3-RFI-SW-C-10125-00
KAIG3-RFI-SW-C-10124 00 KAIG3-RFI-SW-C-10124-00
KAIG3-RFI-CO-S-11020 00 KAIG3-RFI-CO-S-11020-00
KAIG3-RFI-SW-E-0771 00 KAIG3-RFI-SW-E-0771-00
KAIG3-RFI-CF-E-0770 00 KAIG3-RFI-CF-E-0770-00
KAIG3-RFI-SW-E-0753 01 KAIG3-RFI-SW-E-0753-01
KAIG3-RFI-SW-E-0739 01 KAIG3-RFI-SW-E-0739-01
KAIG3-RFI-CF-LC-0995 00 KAIG3-RFI-CF-LC-0995-00
KAIG3-RFI-CF-LC-0994 00 KAIG3-RFI-CF-LC-0994-00
KAIG3-RFI-CF-LC-0993 00 KAIG3-RFI-CF-LC-0993-00
KAIG3-RFI-CO-A-01391 00 KAIG3-RFI-CO-A-01391-00
KAIG3-RFI-CO-A-01390 00 KAIG3-RFI-CO-A-01390-00
KAIG3-RFI-CO-A-01389 00 KAIG3-RFI-CO-A-01389-00
KAIG3-RFI-CO-S-11145 00 KAIG3-RFI-CO-S-11145-00
KAIG3-RFI-CO-S-11148 00 KAIG3-RFI-CO-S-11148-00
KAIG3-RFI-CO-S-11147 00 KAIG3-RFI-CO-S-11147-00
KAIG3-RFI-CO-S-11144 00 KAIG3-RFI-CO-S-11144-00
KAIG3-RFI-CO-S-11142 00 KAIG3-RFI-CO-S-11142-00
KAIG3-RFI-CO-S-11143 00 KAIG3-RFI-CO-S-11143-00
KAIG3-RFI-CO-S-11146 00 KAIG3-RFI-CO-S-11146-00
KAIG3-RFI-CO-A-1383 00 KAIG3-RFI-CO-A-1383-00
KAIG3-RFI-CO-A-1384 00 KAIG3-RFI-CO-A-1384-00
KAIG3-RFI-CO-A-1368 00 KAIG3-RFI-CO-A-1368-00
KAIG3-RFI-CO-A-1367 00 KAIG3-RFI-CO-A-1367-00
KAIG3-RFI-CO-A-1378 00 KAIG3-RFI-CO-A-1378-00
KAIG3-RFI-CO-A-1379 00 KAIG3-RFI-CO-A-1379-00
KAIG3-RFI-CO-A-1380 00 KAIG3-RFI-CO-A-1380-00
KAIG3-RFI-CO-A-1381 00 KAIG3-RFI-CO-A-1381-00
KAIG3-RFI-CO-A-1382 00 KAIG3-RFI-CO-A-1382-00
KAIG3-RFI-WG-LS-1893 00 KAIG3-RFI-WG-LS-1893-00
KAIG3-RFI-WG-LS-1892 00 KAIG3-RFI-WG-LS-1892-00
KAIG3-RFI-SW-LS-1890 00 KAIG3-RFI-SW-LS-1890-00
KAIG3-RFI-SW-C-10123 00 KAIG3-RFI-SW-C-10123-00
KAIG3-RFI-SW-C-10122 00 KAIG3-RFI-SW-C-10122-00
KAIG3-RFI-SW-C-10121 00 KAIG3-RFI-SW-C-10121-00
KAIG3-RFI-SW-C-10110 00 KAIG3-RFI-SW-C-10110-00
KAIG3-RFI-SW-C-10109 00 KAIG3-RFI-SW-C-10109-00
KAIG3-RFI-SW-C-10108 00 KAIG3-RFI-SW-C-10108-00
KAIG3-RFI-SW-C-10107 00 KAIG3-RFI-SW-C-10107-00
KAIG3-RFI-SW-C-10106 00 KAIG3-RFI-SW-C-10106-00
KAIG3-RFI-SW-C-10105 00 KAIG3-RFI-SW-C-10105-00
KAIG3-RFI-SW-C-9980 01 KAIG3-RFI-SW-C-9980-01
KAIG3-RFI-SW-LS-1891 00 KAIG3-RFI-SW-LS-1891-00
KAIG3-RFI-TG-S-11132 00 KAIG3-RFI-TG-S-11132-00
KAIG3-RFI-PG-S-11131 00 KAIG3-RFI-PG-S-11131-00
KAIG3-RFI-PG-S-11130 00 KAIG3-RFI-PG-S-11130-00
KAIG3-RFI-PG-S-11108 00 KAIG3-RFI-PG-S-11108-00
KAIG3-RFI-DG-S-11057 01 KAIG3-RFI-DG-S-11057-01
KAIG3-RFI-TG-A-1373 01 KAIG3-RFI-TG-A-1373-01
KAIG3-RFI-TG-A-1372 01 KAIG3-RFI-TG-A-1372-01
KAIG3-RFI-WG-C-10136 00 KAIG3-RFI-WG-C-10136-00
KAIG3-RFI-TT-C-10118 00 KAIG3-RFI-TT-C-10118-00
KAIG3-RFI-FC-LC-0966 00 KAIG3-RFI-FC-LC-0966-00
KAIG3-RFI-MC-SU-03557 00 KAIG3-RFI-MC-SU-03557-00
KAIG3-RFI-PC-S-11126 00 KAIG3-RFI-PC-S-11126-00
KAIG3-RFI-PC-S-11125 00 KAIG3-RFI-PC-S-11125-00
KAIG3-RFI-MC-S-11136 00 KAIG3-RFI-MC-S-11136-00
KAIG3-RFI-MC-S-11135 00 KAIG3-RFI-MC-S-11135-00
KAIG3-RFI-MC-S-11133 00 KAIG3-RFI-MC-S-11133-00
KAIG3-RFI-EC-SU-03566 00 KAIG3-RFI-EC-SU-03566-00
KAIG3-RFI-CO-SU-03568 00 KAIG3-RFI-CO-SU-03568-00
KAIG3-RFI-CO-S-11139 00 KAIG3-RFI-CO-S-11139-00
KAIG3-RFI-CO-S-11138 00 KAIG3-RFI-CO-S-11138-00
KAIG3-RFI-CC-M-0444 00 KAIG3-RFI-CC-M-0444-00
KAIG3-RFI-CO-S-11137 00 KAIG3-RFI-CO-S-11137-00
KAIG3-RFI-CO-S-11127 00 KAIG3-RFI-CO-S-11127-00
KAIG3-RFI-CO-S-11117 00 KAIG3-RFI-CO-S-11117-00
KAIG3-RFI-CO-S-10021 01 KAIG3-RFI-CO-S-10021-01
KAIG3-RFI-CO-C-10119 00 KAIG3-RFI-CO-C-10119-00
KAIG3-RFI-CO-A-01388 00 KAIG3-RFI-CO-A-01388-00
KAIG3-RFI-CO-A-01387 00 KAIG3-RFI-CO-A-01387-00
KAIG3-RFI-CO-A-01386 00 KAIG3-RFI-CO-A-01386-00
KAIG3-RFI-CG-C-10120 00 KAIG3-RFI-CG-C-10120-00
KAIG3-RFI-CF-SU-03569 00 KAIG3-RFI-CF-SU-03569-00
KAIG3-RFI-CF-SU-03564 00 KAIG3-RFI-CF-SU-03564-00
KAIG3-RFI-CF-S-11140 00 KAIG3-RFI-CF-S-11140-00
KAIG3-RFI-CF-S-11128 00 KAIG3-RFI-CF-S-11128-00
KAIG3-RFI-TT-S-11107 00 KAIG3-RFI-TT-S-11107-00
KAIG3-RFI-PG-E-0769 00 KAIG3-RFI-PG-E-0769-00
KAIG3-RFI-TT-SU-3562 00 KAIG3-RFI-TT-SU-3562-00
KAIG3-RFI-AG-SU-3559 00 KAIG3-RFI-AG-SU-3559-00
KAIG3-RFI-PG-C-10115 00 KAIG3-RFI-PG-C-10115-00
KAIG3-RFI-PG-C-10080 00 KAIG3-RFI-PG-C-10080-00
KAIG3-RFI-SA-LC-0961 01 KAIG3-RFI-SA-LC-0961-01
KAIG3-RFI-EC-E-0768 00 KAIG3-RFI-EC-E-0768-00
KAIG3-RFI-SW-E-0767 00 KAIG3-RFI-SW-E-0767-00
KAIG3-RFI-SW-E-0751 01 KAIG3-RFI-SW-E-0751-01
KAIG3-RFI-SA-E-0766 00 KAIG3-RFI-SA-E-0766-00
KAIG3-RFI-NA-SU-03545 00 KAIG3-RFI-NA-SU-03545-00
KAIG3-RFI-PG-A-01385 00 KAIG3-RFI-PG-A-01385-00
KAIG3-RFI-EC-S-10928 01 KAIG3-RFI-EC-S-10928-01
KAIG3-RFI-SW-C-9830 02 KAIG3-RFI-SW-C-9830-02
KAIG3-RFI-RD-C-7290 04 KAIG3-RFI-RD-C-7290-04
KAIG3-RFI-SA-A-01353 00 KAIG3-RFI-SA-A-01353-00
KAIG3-RFI-EC-S-10848 02 KAIG3-RFI-EC-S-10848-02
KAIG3-RFI-SW-C-9831 02 KAIG3-RFI-SW-C-9831-02
KAIG3-RFI-SW-C-10081 00 KAIG3-RFI-SW-C-10081-00
KAIG3-RFI-SW-C-10090 00 KAIG3-RFI-SW-C-10090-00
KAIG3-RFI-CO-A-1352 01 KAIG3-RFI-CO-A-1352-01
KAIG3-RFI-SA-SU-03561 00 KAIG3-RFI-SA-SU-03561-00
KAIG3-RFI-SW-C-10091 00 KAIG3-RFI-SW-C-10091-00
KAIG3-RFI-SA-S-11119 00 KAIG3-RFI-SA-S-11119-00
KAIG3-RFI-SW-C-10092 00 KAIG3-RFI-SW-C-10092-00
KAIG3-RFI-SA-C-10114 00 KAIG3-RFI-SA-C-10114-00
KAIG3-RFI-SW-C-10093 00 KAIG3-RFI-SW-C-10093-00
KAIG3-RFI-MC-S-11109 00 KAIG3-RFI-MC-S-11109-00
KAIG3-RFI-SW-C-10094 00 KAIG3-RFI-SW-C-10094-00
KAIG3-RFI-MC-C-10112 00 KAIG3-RFI-MC-C-10112-00
KAIG3-RFI-CO-SU-03563 00 KAIG3-RFI-CO-SU-03563-00
KAIG3-RFI-CO-SU-03560 00 KAIG3-RFI-CO-SU-03560-00
KAIG3-RFI-CO-S-11123 00 KAIG3-RFI-CO-S-11123-00
KAIG3-RFI-SW-C-10095 00 KAIG3-RFI-SW-C-10095-00
KAIG3-RFI-CO-S-11122 00 KAIG3-RFI-CO-S-11122-00
KAIG3-RFI-CO-S-11121 00 KAIG3-RFI-CO-S-11121-00
KAIG3-RFI-SW-C-10096 00 KAIG3-RFI-SW-C-10096-00
KAIG3-RFI-CO-S-11118 00 KAIG3-RFI-CO-S-11118-00
KAIG3-RFI-CO-S-11116 00 KAIG3-RFI-CO-S-11116-00
KAIG3-RFI-SW-C-10097 00 KAIG3-RFI-SW-C-10097-00
KAIG3-RFI-CO-S-11115 00 KAIG3-RFI-CO-S-11115-00
KAIG3-RFI-CO-E-0713 01 KAIG3-RFI-CO-E-0713-01
KAIG3-RFI-CO-C-10113 00 KAIG3-RFI-CO-C-10113-00
KAIG3-RFI-SW-C-10098 00 KAIG3-RFI-SW-C-10098-00
KAIG3-RFI-CF-S-11124 00 KAIG3-RFI-CF-S-11124-00
KAIG3-RFI-SW-C-10099 00 KAIG3-RFI-SW-C-10099-00
KAIG3-RFI-CO-E-0714 01 KAIG3-RFI-CO-E-0714-01
KAIG3-RFI-SW-C-10100 00 KAIG3-RFI-SW-C-10100-00
KAIG3-RFI-SW-C-10101 00 KAIG3-RFI-SW-C-10101-00
KAIG3-RFI-SW-C-10102 00 KAIG3-RFI-SW-C-10102-00
KAIG3-RFI-SW-C-10103 00 KAIG3-RFI-SW-C-10103-00
KAIG3-RFI-SW-C-10104 00 KAIG3-RFI-SW-C-10104-00
KAIG3-RFI-SW-LS-1889 00 KAIG3-RFI-SW-LS-1889-00
KAIG3-RFI-SW-M-0443 00 KAIG3-RFI-SW-M-0443-00
KAIG3-RFI-SW-C-10117 00 KAIG3-RFI-SW-C-10117-00
KAIG3-RFI-SW-C-10116 00 KAIG3-RFI-SW-C-10116-00
KAIG3-RFI-WG-C-10111 00 KAIG3-RFI-WG-C-10111-00
KAIG3-RFI-PG-LS-1888 00 KAIG3-RFI-PG-LS-1888-00
KAIG3-RFI-SA-S-11000 00 KAIG3-RFI-SA-S-11000-00
KAIG3-RFI-WG-LS-1887 00 KAIG3-RFI-WG-LS-1887-00
KAIG3-RFI-CO-S-10988 00 KAIG3-RFI-CO-S-10988-00
KAIG3-RFI-CC-S-10321 00 KAIG3-RFI-CC-S-10321-00
KAIG3-RFI-SM-S-10503 01 KAIG3-RFI-SM-S-10503-01
KAIG3-RFI-SW-C-9874 00 KAIG3-RFI-SW-C-9874-00
KAIG3-RFI-CC-S-10999 00 KAIG3-RFI-CC-S-10999-00
KAIG3-RFI-MB-SU-3558 00 KAIG3-RFI-MB-SU-3558-00
KAIG3-RFI-PG-LS-1886 00 KAIG3-RFI-PG-LS-1886-00
KAIG3-RFI-PG-LS-1885 00 KAIG3-RFI-PG-LS-1885-00
KAIG3-RFI-TG-C-10084 00 KAIG3-RFI-TG-C-10084-00
KAIG3-RFI-PG-C-10083 00 KAIG3-RFI-PG-C-10083-00
KAIG3-RFI-PG-C-10079 00 KAIG3-RFI-PG-C-10079-00
KAIG3-RFI-PG-C-10078 00 KAIG3-RFI-PG-C-10078-00
KAIG3-RFI-PG-C-10077 00 KAIG3-RFI-PG-C-10077-00
KAIG3-RFI-TG-C-9941 01 KAIG3-RFI-TG-C-9941-01
KAIG3-RFI-TB-S-11106 00 KAIG3-RFI-TB-S-11106-00
KAIG3-RFI-TB-S-11010 01 KAIG3-RFI-TB-S-11010-01
KAIG3-RFI-SW-C-10011 00 KAIG3-RFI-SW-C-10011-00
KAIG3-RFI-SW-C-10010 00 KAIG3-RFI-SW-C-10010-00
KAIG3-RFI-SW-LS-1879 00 KAIG3-RFI-SW-LS-1879-00
KAIG3-RFI-SW-C-10008 00 KAIG3-RFI-SW-C-10008-00
KAIG3-RFI-SW-C-10076 00 KAIG3-RFI-SW-C-10076-00
KAIG3-RFI-SW-C-10082 00 KAIG3-RFI-SW-C-10082-00
KAIG3-RFI-SW-C-10088 00 KAIG3-RFI-SW-C-10088-00
KAIG3-RFI-SW-C-10089 00 KAIG3-RFI-SW-C-10089-00
KAIG3-RFI-SW-C-10075 00 KAIG3-RFI-SW-C-10075-00
KAIG3-RFI-SW-C-10074 00 KAIG3-RFI-SW-C-10074-00
KAIG3-RFI-SW-C-10073 00 KAIG3-RFI-SW-C-10073-00
KAIG3-RFI-SW-C-10072 00 KAIG3-RFI-SW-C-10072-00
KAIG3-RFI-SW-C-10071 00 KAIG3-RFI-SW-C-10071-00
KAIG3-RFI-SW-C-10070 00 KAIG3-RFI-SW-C-10070-00
KAIG3-RFI-SW-C-10069 00 KAIG3-RFI-SW-C-10069-00
KAIG3-RFI-SW-C-10068 00 KAIG3-RFI-SW-C-10068-00
KAIG3-RFI-SW-C-10067 00 KAIG3-RFI-SW-C-10067-00
KAIG3-RFI-SW-C-10066 00 KAIG3-RFI-SW-C-10066-00
KAIG3-RFI-SW-C-10065 00 KAIG3-RFI-SW-C-10065-00
KAIG3-RFI-SW-C-10064 00 KAIG3-RFI-SW-C-10064-00
KAIG3-RFI-SW-C-10063 00 KAIG3-RFI-SW-C-10063-00
KAIG3-RFI-SW-C-10062 00 KAIG3-RFI-SW-C-10062-00
KAIG3-RFI-SW-C-10061 00 KAIG3-RFI-SW-C-10061-00
KAIG3-RFI-SW-C-10060 00 KAIG3-RFI-SW-C-10060-00
KAIG3-RFI-SW-C-10059 00 KAIG3-RFI-SW-C-10059-00
KAIG3-RFI-SW-C-10058 00 KAIG3-RFI-SW-C-10058-00
KAIG3-RFI-SW-C-9998 01 KAIG3-RFI-SW-C-9998-01
KAIG3-RFI-CO-S-11110 00 KAIG3-RFI-CO-S-11110-00
KAIG3-RFI-CO-S-11111 00 KAIG3-RFI-CO-S-11111-00
KAIG3-RFI-CO-S-11112 00 KAIG3-RFI-CO-S-11112-00
KAIG3-RFI-EC-S-11114 00 KAIG3-RFI-EC-S-11114-00
KAIG3-RFI-CG-C-10085 00 KAIG3-RFI-CG-C-10085-00
KAIG3-RFI-NG-C-10086 00 KAIG3-RFI-NG-C-10086-00
KAIG3-RFI-CG-C-10087 00 KAIG3-RFI-CG-C-10087-00
KAIG3-RFI-CO-S-11103 00 KAIG3-RFI-CO-S-11103-00
KAIG3-RFI-CO-S-11102 00 KAIG3-RFI-CO-S-11102-00
KAIG3-RFI-CO-S-11101 00 KAIG3-RFI-CO-S-11101-00
KAIG3-RFI-CO-SS-00461 00 KAIG3-RFI-CO-SS-00461-00
KAIG3-RFI-CO-SU-03556 00 KAIG3-RFI-CO-SU-03556-00
KAIG3-RFI-CO-S-11100 00 KAIG3-RFI-CO-S-11100-00
KAIG3-RFI-CO-S-11104 00 KAIG3-RFI-CO-S-11104-00
KAIG3-RFI-CO-SU-03557 00 KAIG3-RFI-CO-SU-03557-00
KAIG3-RFI-CO-S-11105 00 KAIG3-RFI-CO-S-11105-00
KAIG3-RFI-SW-M-0442 00 KAIG3-RFI-SW-M-0442-00
KAIG3-RFI-NA-S-11093 00 KAIG3-RFI-NA-S-11093-00
KAIG3-RFI-SW-C-10057 00 KAIG3-RFI-SW-C-10057-00
KAIG3-RFI-SW-C-10045 00 KAIG3-RFI-SW-C-10045-00
KAIG3-RFI-SW-C-10044 00 KAIG3-RFI-SW-C-10044-00
KAIG3-RFI-SW-C-10043 00 KAIG3-RFI-SW-C-10043-00
KAIG3-RFI-SW-C-10042 00 KAIG3-RFI-SW-C-10042-00
KAIG3-RFI-SW-C-10041 00 KAIG3-RFI-SW-C-10041-00
KAIG3-RFI-SW-LS-1828 01 KAIG3-RFI-SW-LS-1828-01
KAIG3-RFI-SW-C-10040 00 KAIG3-RFI-SW-C-10040-00
KAIG3-RFI-SW-C-10039 00 KAIG3-RFI-SW-C-10039-00
KAIG3-RFI-SW-C-10038 00 KAIG3-RFI-SW-C-10038-00
KAIG3-RFI-SW-C-10037 00 KAIG3-RFI-SW-C-10037-00
KAIG3-RFI-SW-C-10036 00 KAIG3-RFI-SW-C-10036-00
KAIG3-RFI-SW-C-10034 00 KAIG3-RFI-SW-C-10034-00
KAIG3-RFI-SW-C-9996 00 KAIG3-RFI-SW-C-9996-00
KAIG3-RFI-TT-C-10054 00 KAIG3-RFI-TT-C-10054-00
KAIG3-RFI-PG-C-10053 00 KAIG3-RFI-PG-C-10053-00
KAIG3-RFI-PG-C-10052 00 KAIG3-RFI-PG-C-10052-00
KAIG3-RFI-WG-C-10051 00 KAIG3-RFI-WG-C-10051-00
KAIG3-RFI-TG-C-10050 00 KAIG3-RFI-TG-C-10050-00
KAIG3-RFI-WG-LS-1883 00 KAIG3-RFI-WG-LS-1883-00
KAIG3-RFI-DG-LS-1884 00 KAIG3-RFI-DG-LS-1884-00
KAIG3-RFI-PG-A-1377 00 KAIG3-RFI-PG-A-1377-00
KAIG3-RFI-SW-LC-0980 01 KAIG3-RFI-SW-LC-0980-01
KAIG3-RFI-SW-LC-0979 01 KAIG3-RFI-SW-LC-0979-01
KAIG3-RFI-CO-S-11089 00 KAIG3-RFI-CO-S-11089-00
KAIG3-RFI-CO-C-10048 00 KAIG3-RFI-CO-C-10048-00
KAIG3-RFI-NA-SU-03555 00 KAIG3-RFI-NA-SU-03555-00
KAIG3-RFI-CF-S-11099 00 KAIG3-RFI-CF-S-11099-00
KAIG3-RFI-CO-S-11098 00 KAIG3-RFI-CO-S-11098-00
KAIG3-RFI-CO-S-11097 00 KAIG3-RFI-CO-S-11097-00
KAIG3-RFI-NA-S-11096 00 KAIG3-RFI-NA-S-11096-00
KAIG3-RFI-NA-S-11095 00 KAIG3-RFI-NA-S-11095-00
KAIG3-RFI-NA-S-11094 00 KAIG3-RFI-NA-S-11094-00
KAIG3-RFI-NA-S-11092 00 KAIG3-RFI-NA-S-11092-00
KAIG3-RFI-CF-S-11091 00 KAIG3-RFI-CF-S-11091-00
KAIG3-RFI-PC-S-11090 00 KAIG3-RFI-PC-S-11090-00
KAIG3-RFI-NA-S-11062 00 KAIG3-RFI-NA-S-11062-00
KAIG3-RFI-CO-S-9835 00 KAIG3-RFI-CO-S-9835-00
KAIG3-RFI-SA-C-10049 00 KAIG3-RFI-SA-C-10049-00
KAIG3-RFI-WG-C-10056 00 KAIG3-RFI-WG-C-10056-00
KAIG3-RFI-WG-C-10055 00 KAIG3-RFI-WG-C-10055-00
KAIG3-RFI-TG-LS-1882 00 KAIG3-RFI-TG-LS-1882-00
KAIG3-RFI-CC-P-0441 00 KAIG3-RFI-CC-P-0441-00
KAIG3-RFI-CO-SU-03554 00 KAIG3-RFI-CO-SU-03554-00
KAIG3-RFI-CO-SU-03552 00 KAIG3-RFI-CO-SU-03552-00
KAIG3-RFI-CO-SU-03553 00 KAIG3-RFI-CO-SU-03553-00
KAIG3-RFI-CG-C-10047 00 KAIG3-RFI-CG-C-10047-00
KAIG3-RFI-NG-C-10046 00 KAIG3-RFI-NG-C-10046-00
KAIG3-RFI-CO-S-11085 00 KAIG3-RFI-CO-S-11085-00
KAIG3-RFI-CO-S-11088 00 KAIG3-RFI-CO-S-11088-00
KAIG3-RFI-CO-S-11086 00 KAIG3-RFI-CO-S-11086-00
KAIG3-RFI-CO-S-11079 00 KAIG3-RFI-CO-S-11079-00
KAIG3-RFI-SW-C-10035 00 KAIG3-RFI-SW-C-10035-00
KAIG3-RFI-CO-S-11080 00 KAIG3-RFI-CO-S-11080-00
KAIG3-RFI-SW-C-10033 00 KAIG3-RFI-SW-C-10033-00
KAIG3-RFI-PC-S-11035 00 KAIG3-RFI-PC-S-11035-00
KAIG3-RFI-SW-C-10032 00 KAIG3-RFI-SW-C-10032-00
KAIG3-RFI-SW-C-10030 00 KAIG3-RFI-SW-C-10030-00
KAIG3-RFI-SW-C-10029 00 KAIG3-RFI-SW-C-10029-00
KAIG3-RFI-CO-S-11087 00 KAIG3-RFI-CO-S-11087-00
KAIG3-RFI-SW-C-10028 00 KAIG3-RFI-SW-C-10028-00
KAIG3-RFI-SW-C-10027 00 KAIG3-RFI-SW-C-10027-00
KAIG3-RFI-SA-C-09985 00 KAIG3-RFI-SA-C-09985-00
KAIG3-RFI-SW-C-10026 00 KAIG3-RFI-SW-C-10026-00
KAIG3-RFI-SA-C-09984 00 KAIG3-RFI-SA-C-09984-00
KAIG3-RFI-SW-C-10025 00 KAIG3-RFI-SW-C-10025-00
KAIG3-RFI-SW-C-10024 00 KAIG3-RFI-SW-C-10024-00
KAIG3-RFI-CO-A-01375 00 KAIG3-RFI-CO-A-01375-00
KAIG3-RFI-SW-C-10023 00 KAIG3-RFI-SW-C-10023-00
KAIG3-RFI-SW-C-10022 00 KAIG3-RFI-SW-C-10022-00
KAIG3-RFI-SW-A-1374 00 KAIG3-RFI-SW-A-1374-00
KAIG3-RFI-CO-A-01376 00 KAIG3-RFI-CO-A-01376-00
KAIG3-RFI-SW-C-9476 01 KAIG3-RFI-SW-C-9476-01
KAIG3-RFI-SW-A-1284 01 KAIG3-RFI-SW-A-1284-01
KAIG3-RFI-CO-S-11078 00 KAIG3-RFI-CO-S-11078-00
KAIG3-RFI-CO-S-11081 00 KAIG3-RFI-CO-S-11081-00
KAIG3-RFI-PG-S-11077 00 KAIG3-RFI-PG-S-11077-00
KAIG3-RFI-CO-S-11084 00 KAIG3-RFI-CO-S-11084-00
KAIG3-RFI-PG-S-11076 00 KAIG3-RFI-PG-S-11076-00
KAIG3-RFI-CO-SU-03550 00 KAIG3-RFI-CO-SU-03550-00
KAIG3-RFI-CO-S-11073 00 KAIG3-RFI-CO-S-11073-00
KAIG3-RFI-CO-S-11072 00 KAIG3-RFI-CO-S-11072-00
KAIG3-RFI-CO-S-11071 00 KAIG3-RFI-CO-S-11071-00
KAIG3-RFI-CC-S-11068 00 KAIG3-RFI-CC-S-11068-00
KAIG3-RFI-EC-S-10848 01 KAIG3-RFI-EC-S-10848-01
KAIG3-RFI-CO-S-10697 01 KAIG3-RFI-CO-S-10697-01
KAIG3-RFI-CC-S-11067 00 KAIG3-RFI-CC-S-11067-00
KAIG3-RFI-CO-S-9947 01 KAIG3-RFI-CO-S-9947-01
KAIG3-RFI-CO-C-09958 00 KAIG3-RFI-CO-C-09958-00
KAIG3-RFI-SA-LC-0989 00 KAIG3-RFI-SA-LC-0989-00
KAIG3-RFI-SA-LC-0988 00 KAIG3-RFI-SA-LC-0988-00
KAIG3-RFI-CG-E-0761 00 KAIG3-RFI-CG-E-0761-00
KAIG3-RFI-CG-E-0760 00 KAIG3-RFI-CG-E-0760-00
KAIG3-RFI-SA-E-0759 00 KAIG3-RFI-SA-E-0759-00
KAIG3-RFI-SA-E-0758 00 KAIG3-RFI-SA-E-0758-00
KAIG3-RFI-SA-E-0757 00 KAIG3-RFI-SA-E-0757-00
KAIG3-RFI-SA-E-0756 00 KAIG3-RFI-SA-E-0756-00
KAIG3-RFI-MB-P-0440 00 KAIG3-RFI-MB-P-0440-00
KAIG3-RFI-SA-P-0438 00 KAIG3-RFI-SA-P-0438-00
KAIG3-RFI-SW-M-0439 00 KAIG3-RFI-SW-M-0439-00
KAIG3-RFI-WG-LS-1840 01 KAIG3-RFI-WG-LS-1840-01
KAIG3-RFI-WG-LS-1839 01 KAIG3-RFI-WG-LS-1839-01
KAIG3-RFI-WG-LS-1838 01 KAIG3-RFI-WG-LS-1838-01
KAIG3-RFI-CO-C-09993 00 KAIG3-RFI-CO-C-09993-00
KAIG3-RFI-TG-A-1372 00 KAIG3-RFI-TG-A-1372-00
KAIG3-RFI-PG-C-10031 00 KAIG3-RFI-PG-C-10031-00
KAIG3-RFI-CG-LC-0987 00 KAIG3-RFI-CG-LC-0987-00
KAIG3-RFI-FC-LC-0960 02 KAIG3-RFI-FC-LC-0960-02
KAIG3-RFI-SW-C-9908 00 KAIG3-RFI-SW-C-9908-00
KAIG3-RFI-SW-LS-1881 00 KAIG3-RFI-SW-LS-1881-00
KAIG3-RFI-SW-LS-1880 00 KAIG3-RFI-SW-LS-1880-00
KAIG3-RFI-SW-C-10021 00 KAIG3-RFI-SW-C-10021-00
KAIG3-RFI-SW-C-10020 00 KAIG3-RFI-SW-C-10020-00
KAIG3-RFI-SW-C-10019 00 KAIG3-RFI-SW-C-10019-00
KAIG3-RFI-SW-C-10018 00 KAIG3-RFI-SW-C-10018-00
KAIG3-RFI-FC-LC-0982 00 KAIG3-RFI-FC-LC-0982-00
KAIG3-RFI-SW-C-10017 00 KAIG3-RFI-SW-C-10017-00
KAIG3-RFI-SW-C-10014 00 KAIG3-RFI-SW-C-10014-00
KAIG3-RFI-SW-C-10013 00 KAIG3-RFI-SW-C-10013-00
KAIG3-RFI-PA-C-10016 00 KAIG3-RFI-PA-C-10016-00
KAIG3-RFI-PA-C-10015 00 KAIG3-RFI-PA-C-10015-00
KAIG3-RFI-SW-C-8798 01 KAIG3-RFI-SW-C-8798-01
KAIG3-RFI-SW-C-9829 01 KAIG3-RFI-SW-C-9829-01
KAIG3-RFI-SW-C-9830 01 KAIG3-RFI-SW-C-9830-01
KAIG3-RFI-SW-C-9831 01 KAIG3-RFI-SW-C-9831-01
KAIG3-RFI-SW-C-9845 01 KAIG3-RFI-SW-C-9845-01
KAIG3-RFI-SW-C-9973 00 KAIG3-RFI-SW-C-9973-00
KAIG3-RFI-SW-C-9978 00 KAIG3-RFI-SW-C-9978-00
KAIG3-RFI-SW-C-9979 00 KAIG3-RFI-SW-C-9979-00
KAIG3-RFI-SW-C-9980 00 KAIG3-RFI-SW-C-9980-00
KAIG3-RFI-SW-C-9994 00 KAIG3-RFI-SW-C-9994-00
KAIG3-RFI-SW-C-9995 00 KAIG3-RFI-SW-C-9995-00
KAIG3-RFI-SW-C-9997 00 KAIG3-RFI-SW-C-9997-00
KAIG3-RFI-SW-C-9998 00 KAIG3-RFI-SW-C-9998-00
KAIG3-RFI-SW-C-9999 00 KAIG3-RFI-SW-C-9999-00
KAIG3-RFI-SW-C-10000 00 KAIG3-RFI-SW-C-10000-00
KAIG3-RFI-SW-C-10001 00 KAIG3-RFI-SW-C-10001-00
KAIG3-RFI-SW-C-10002 00 KAIG3-RFI-SW-C-10002-00
KAIG3-RFI-SW-C-10003 00 KAIG3-RFI-SW-C-10003-00
KAIG3-RFI-SW-C-10004 00 KAIG3-RFI-SW-C-10004-00
KAIG3-RFI-SW-C-10005 00 KAIG3-RFI-SW-C-10005-00
KAIG3-RFI-SW-C-10009 00 KAIG3-RFI-SW-C-10009-00
KAIG3-RFI-SW-LS-1878 00 KAIG3-RFI-SW-LS-1878-00
KAIG3-RFI-PC-S-10355 01 KAIG3-RFI-PC-S-10355-01
KAIG3-RFI-PC-S-10354 01 KAIG3-RFI-PC-S-10354-01
KAIG3-RFI-NA-SU-03548 00 KAIG3-RFI-NA-SU-03548-00
KAIG3-RFI-NA-SU-03547 00 KAIG3-RFI-NA-SU-03547-00
KAIG3-RFI-NA-S-11064 00 KAIG3-RFI-NA-S-11064-00
KAIG3-RFI-NA-S-11063 00 KAIG3-RFI-NA-S-11063-00
KAIG3-RFI-NA-S-10830 01 KAIG3-RFI-NA-S-10830-01
KAIG3-RFI-NA-S-10026 01 KAIG3-RFI-NA-S-10026-01
KAIG3-RFI-MC-S-11061 00 KAIG3-RFI-MC-S-11061-00
KAIG3-RFI-MC-S-11060 00 KAIG3-RFI-MC-S-11060-00
KAIG3-RFI-MC-S-11059 00 KAIG3-RFI-MC-S-11059-00
KAIG3-RFI-EC-S-11058 00 KAIG3-RFI-EC-S-11058-00
KAIG3-RFI-CO-SU-03549 00 KAIG3-RFI-CO-SU-03549-00
KAIG3-RFI-CO-SU-03499 01 KAIG3-RFI-CO-SU-03499-01
KAIG3-RFI-CO-SU-03433 01 KAIG3-RFI-CO-SU-03433-01
KAIG3-RFI-CO-S-11066 00 KAIG3-RFI-CO-S-11066-00
KAIG3-RFI-CO-S-11065 00 KAIG3-RFI-CO-S-11065-00
KAIG3-RFI-CO-S-10628 01 KAIG3-RFI-CO-S-10628-01
KAIG3-RFI-CO-S-10342 01 KAIG3-RFI-CO-S-10342-01
KAIG3-RFI-PC-S-11033 00 KAIG3-RFI-PC-S-11033-00
KAIG3-RFI-CO-S-10040 01 KAIG3-RFI-CO-S-10040-01
KAIG3-RFI-PC-S-11034 00 KAIG3-RFI-PC-S-11034-00
KAIG3-RFI-CO-S-9162 01 KAIG3-RFI-CO-S-9162-01
KAIG3-RFI-PC-S-11021 00 KAIG3-RFI-PC-S-11021-00
KAIG3-RFI-CO-A-01371 00 KAIG3-RFI-CO-A-01371-00
KAIG3-RFI-CO-A-01370 00 KAIG3-RFI-CO-A-01370-00
KAIG3-RFI-PC-S-11022 00 KAIG3-RFI-PC-S-11022-00
KAIG3-RFI-CO-A-01369 00 KAIG3-RFI-CO-A-01369-00
KAIG3-RFI-CC-SU-03387 01 KAIG3-RFI-CC-SU-03387-01
KAIG3-RFI-DG-SU-3546 00 KAIG3-RFI-DG-SU-3546-00
KAIG3-RFI-WG-C-10006 00 KAIG3-RFI-WG-C-10006-00
KAIG3-RFI-WG-C-9623 01 KAIG3-RFI-WG-C-9623-01
KAIG3-RFI-DG-S-11057 00 KAIG3-RFI-DG-S-11057-00
KAIG3-RFI-DG-S-11056 00 KAIG3-RFI-DG-S-11056-00
KAIG3-RFI-PC-SU-03538 00 KAIG3-RFI-PC-SU-03538-00
KAIG3-RFI-PC-SU-03536 00 KAIG3-RFI-PC-SU-03536-00
KAIG3-RFI-CO-SU-03542 00 KAIG3-RFI-CO-SU-03542-00
KAIG3-RFI-CO-SU-03541 00 KAIG3-RFI-CO-SU-03541-00
KAIG3-RFI-PG-S-11055 00 KAIG3-RFI-PG-S-11055-00
KAIG3-RFI-CC-SU-03540 00 KAIG3-RFI-CC-SU-03540-00
KAIG3-RFI-CO-SU-03543 00 KAIG3-RFI-CO-SU-03543-00
KAIG3-RFI-NA-SU-03544 00 KAIG3-RFI-NA-SU-03544-00
KAIG3-RFI-PC-SU-03539 00 KAIG3-RFI-PC-SU-03539-00
KAIG3-RFI-NA-S-11050 00 KAIG3-RFI-NA-S-11050-00
KAIG3-RFI-CO-S-11047 00 KAIG3-RFI-CO-S-11047-00
KAIG3-RFI-CO-S-11046 00 KAIG3-RFI-CO-S-11046-00
KAIG3-RFI-NA-S-11048 00 KAIG3-RFI-NA-S-11048-00
KAIG3-RFI-NA-S-11049 00 KAIG3-RFI-NA-S-11049-00
KAIG3-RFI-CO-S-11043 00 KAIG3-RFI-CO-S-11043-00
KAIG3-RFI-CO-S-11045 00 KAIG3-RFI-CO-S-11045-00
KAIG3-RFI-CO-S-11044 00 KAIG3-RFI-CO-S-11044-00
KAIG3-RFI-CC-S-11038 00 KAIG3-RFI-CC-S-11038-00
KAIG3-RFI-CO-S-11039 00 KAIG3-RFI-CO-S-11039-00
KAIG3-RFI-CO-S-11040 00 KAIG3-RFI-CO-S-11040-00
KAIG3-RFI-CO-S-11041 00 KAIG3-RFI-CO-S-11041-00
KAIG3-RFI-CO-S-11042 00 KAIG3-RFI-CO-S-11042-00
KAIG3-RFI-CC-S-11036 00 KAIG3-RFI-CC-S-11036-00
KAIG3-RFI-CC-S-11037 00 KAIG3-RFI-CC-S-11037-00
KAIG3-RFI-PC-S-11023 00 KAIG3-RFI-PC-S-11023-00
KAIG3-RFI-PC-S-11024 00 KAIG3-RFI-PC-S-11024-00
KAIG3-RFI-CC-S-11029 00 KAIG3-RFI-CC-S-11029-00
KAIG3-RFI-CC-S-11030 00 KAIG3-RFI-CC-S-11030-00
KAIG3-RFI-PC-S-11031 00 KAIG3-RFI-PC-S-11031-00
KAIG3-RFI-PC-S-11032 00 KAIG3-RFI-PC-S-11032-00
KAIG3-RFI-CO-S-9761 00 KAIG3-RFI-CO-S-9761-00
KAIG3-RFI-CO-S-10788 00 KAIG3-RFI-CO-S-10788-00
KAIG3-RFI-SA-S-10937 00 KAIG3-RFI-SA-S-10937-00
KAIG3-RFI-EC-A-01362 00 KAIG3-RFI-EC-A-01362-00
KAIG3-RFI-EC-A-01361-00 00 KAIG3-RFI-EC-A-01361-00-00
KAIG3-RFI-EC-A-01360 00 KAIG3-RFI-EC-A-01360-00
KAIG3-RFI-SW-E-0755 00 KAIG3-RFI-SW-E-0755-00
KAIG3-RFI-SW-E-0754 00 KAIG3-RFI-SW-E-0754-00
KAIG3-RFI-SW-LC-0986 00 KAIG3-RFI-SW-LC-0986-00
KAIG3-RFI-SW-LC-0985 00 KAIG3-RFI-SW-LC-0985-00
KAIG3-RFI-SW-LC-0984 00 KAIG3-RFI-SW-LC-0984-00
KAIG3-RFI-SW-LC-0983 00 KAIG3-RFI-SW-LC-0983-00
KAIG3-RFI-TG-LC-0981 00 KAIG3-RFI-TG-LC-0981-00
KAIG3-RFI-SW-A-1283 01 KAIG3-RFI-SW-A-1283-01
KAIG3-RFI-WG-C-9967 00 KAIG3-RFI-WG-C-9967-00
KAIG3-RFI-WG-LS-1876 00 KAIG3-RFI-WG-LS-1876-00
KAIG3-RFI-WG-LS-1875 00 KAIG3-RFI-WG-LS-1875-00
KAIG3-RFI-WG-LS-1874 00 KAIG3-RFI-WG-LS-1874-00
KAIG3-RFI-TB-S-11010 00 KAIG3-RFI-TB-S-11010-00
KAIG3-RFI-TT-S-10873 01 KAIG3-RFI-TT-S-10873-01
KAIG3-RFI-AG-S-10929 01 KAIG3-RFI-AG-S-10929-01
KAIG3-RFI-SW-E-0743 01 KAIG3-RFI-SW-E-0743-01
KAIG3-RFI-SW-E-0741 01 KAIG3-RFI-SW-E-0741-01
KAIG3-RFI-SW-E-0753 00 KAIG3-RFI-SW-E-0753-00
KAIG3-RFI-SW-E-0752 00 KAIG3-RFI-SW-E-0752-00
KAIG3-RFI-SW-E-0751 00 KAIG3-RFI-SW-E-0751-00
KAIG3-RFI-SW-E-0750 00 KAIG3-RFI-SW-E-0750-00
KAIG3-RFI-TB-E-0749 00 KAIG3-RFI-TB-E-0749-00
KAIG3-RFI-SW-LS-1873 00 KAIG3-RFI-SW-LS-1873-00
KAIG3-RFI-SW-C-9992 00 KAIG3-RFI-SW-C-9992-00
KAIG3-RFI-SW-C-9991 00 KAIG3-RFI-SW-C-9991-00
KAIG3-RFI-SW-C-9990 00 KAIG3-RFI-SW-C-9990-00
KAIG3-RFI-SW-C-9989 00 KAIG3-RFI-SW-C-9989-00
KAIG3-RFI-SW-C-9988 00 KAIG3-RFI-SW-C-9988-00
KAIG3-RFI-SW-C-9987 00 KAIG3-RFI-SW-C-9987-00
KAIG3-RFI-SW-C-9986 00 KAIG3-RFI-SW-C-9986-00
KAIG3-RFI-SW-C-9983 00 KAIG3-RFI-SW-C-9983-00
KAIG3-RFI-SW-C-9977 00 KAIG3-RFI-SW-C-9977-00
KAIG3-RFI-SW-C-9976 00 KAIG3-RFI-SW-C-9976-00
KAIG3-RFI-SW-C-9975 00 KAIG3-RFI-SW-C-9975-00
KAIG3-RFI-SW-C-9974 00 KAIG3-RFI-SW-C-9974-00
KAIG3-RFI-SW-C-9972 00 KAIG3-RFI-SW-C-9972-00
KAIG3-RFI-SW-C-9969 00 KAIG3-RFI-SW-C-9969-00
KAIG3-RFI-SW-C-9968 00 KAIG3-RFI-SW-C-9968-00
KAIG3-RFI-SW-C-9960 00 KAIG3-RFI-SW-C-9960-00
KAIG3-RFI-SW-C-9955 00 KAIG3-RFI-SW-C-9955-00
KAIG3-RFI-SW-C-9954 00 KAIG3-RFI-SW-C-9954-00
KAIG3-RFI-SW-C-9907 00 KAIG3-RFI-SW-C-9907-00
KAIG3-RFI-SW-C-9838 01 KAIG3-RFI-SW-C-9838-01
KAIG3-RFI-SW-C-9674 01 KAIG3-RFI-SW-C-9674-01
KAIG3-RFI-PA-C-9971 00 KAIG3-RFI-PA-C-9971-00
KAIG3-RFI-PA-C-9970 00 KAIG3-RFI-PA-C-9970-00
KAIG3-RFI-TG-SU-3535 00 KAIG3-RFI-TG-SU-3535-00
KAIG3-RFI-TB-SU-3532 00 KAIG3-RFI-TB-SU-3532-00
KAIG3-RFI-TG-S-11019 00 KAIG3-RFI-TG-S-11019-00
KAIG3-RFI-TG-S-11018 00 KAIG3-RFI-TG-S-11018-00
KAIG3-RFI-TB-S-11017 00 KAIG3-RFI-TB-S-11017-00
KAIG3-RFI-AG-S-11012 00 KAIG3-RFI-AG-S-11012-00
KAIG3-RFI-PG-S-11011 00 KAIG3-RFI-PG-S-11011-00
KAIG3-RFI-TB-S-11009 00 KAIG3-RFI-TB-S-11009-00
KAIG3-RFI-TB-S-11008 00 KAIG3-RFI-TB-S-11008-00
KAIG3-RFI-TB-S-10995 00 KAIG3-RFI-TB-S-10995-00
KAIG3-RFI-TG-C-9959 00 KAIG3-RFI-TG-C-9959-00
KAIG3-RFI-SW-LS-1877 00 KAIG3-RFI-SW-LS-1877-00
KAIG3-RFI-TG-C-9982 00 KAIG3-RFI-TG-C-9982-00
KAIG3-RFI-TG-C-9941 00 KAIG3-RFI-TG-C-9941-00
KAIG3-RFI-SW-C-9981 00 KAIG3-RFI-SW-C-9981-00
KAIG3-RFI-MC-C-09856 01 KAIG3-RFI-MC-C-09856-01
KAIG3-RFI-CO-C-09957 00 KAIG3-RFI-CO-C-09957-00
KAIG3-RFI-CO-C-09956 00 KAIG3-RFI-CO-C-09956-00
KAIG3-RFI-MC-SU-03537 00 KAIG3-RFI-MC-SU-03537-00
KAIG3-RFI-NA-SU-03533 00 KAIG3-RFI-NA-SU-03533-00
KAIG3-RFI-EC-SU-03534 00 KAIG3-RFI-EC-SU-03534-00
KAIG3-RFI-CO-SU-03531 00 KAIG3-RFI-CO-SU-03531-00
KAIG3-RFI-CO-SU-03526 00 KAIG3-RFI-CO-SU-03526-00
KAIG3-RFI-MC-S-11028 00 KAIG3-RFI-MC-S-11028-00
KAIG3-RFI-CO-S-11025 00 KAIG3-RFI-CO-S-11025-00
KAIG3-RFI-MC-S-11026 00 KAIG3-RFI-MC-S-11026-00
KAIG3-RFI-MC-S-11027 00 KAIG3-RFI-MC-S-11027-00
KAIG3-RFI-NA-S-11014 00 KAIG3-RFI-NA-S-11014-00
KAIG3-RFI-EC-S-10926 01 KAIG3-RFI-EC-S-10926-01
KAIG3-RFI-EC-S-11015 00 KAIG3-RFI-EC-S-11015-00
KAIG3-RFI-CO-S-11016 00 KAIG3-RFI-CO-S-11016-00
KAIG3-RFI-NA-S-11013 00 KAIG3-RFI-NA-S-11013-00
KAIG3-RFI-CO-S-11006 00 KAIG3-RFI-CO-S-11006-00
KAIG3-RFI-CO-S-11007 00 KAIG3-RFI-CO-S-11007-00
KAIG3-RFI-CO-S-10913 01 KAIG3-RFI-CO-S-10913-01
KAIG3-RFI-CO-S-10996 00 KAIG3-RFI-CO-S-10996-00
KAIG3-RFI-CO-S-10997 00 KAIG3-RFI-CO-S-10997-00
KAIG3-RFI-SW-LC-0980 00 KAIG3-RFI-SW-LC-0980-00
KAIG3-RFI-SW-LC-0979 00 KAIG3-RFI-SW-LC-0979-00
KAIG3-RFI-PG-LC-0978 00 KAIG3-RFI-PG-LC-0978-00
KAIG3-RFI-TG-LC-0977 00 KAIG3-RFI-TG-LC-0977-00
KAIG3-RFI-TG-LC-0976 00 KAIG3-RFI-TG-LC-0976-00
KAIG3-RFI-TG-LC-0975 00 KAIG3-RFI-TG-LC-0975-00
KAIG3-RFI-FC-E-0748 00 KAIG3-RFI-FC-E-0748-00
KAIG3-RFI-CO-C-09855 01 KAIG3-RFI-CO-C-09855-01
KAIG3-RFI-CO-A-01365 00 KAIG3-RFI-CO-A-01365-00
KAIG3-RFI-CO-A-01363 00 KAIG3-RFI-CO-A-01363-00
KAIG3-RFI-CO-A-01364 00 KAIG3-RFI-CO-A-01364-00
KAIG3-RFI-CO-SU-03530 00 KAIG3-RFI-CO-SU-03530-00
KAIG3-RFI-CO-SU-03529 00 KAIG3-RFI-CO-SU-03529-00
KAIG3-RFI-SA-SU-03528 00 KAIG3-RFI-SA-SU-03528-00
KAIG3-RFI-CC-SU-03527 00 KAIG3-RFI-CC-SU-03527-00
KAIG3-RFI-MC-SU-03525 00 KAIG3-RFI-MC-SU-03525-00
KAIG3-RFI-CO-S-11005 00 KAIG3-RFI-CO-S-11005-00
KAIG3-RFI-CO-S-11004 00 KAIG3-RFI-CO-S-11004-00
KAIG3-RFI-CO-S-11003 00 KAIG3-RFI-CO-S-11003-00
KAIG3-RFI-CO-S-11002 00 KAIG3-RFI-CO-S-11002-00
KAIG3-RFI-CC-S-10998 00 KAIG3-RFI-CC-S-10998-00
KAIG3-RFI-MC-S-10992 00 KAIG3-RFI-MC-S-10992-00
KAIG3-RFI-MC-S-10993 00 KAIG3-RFI-MC-S-10993-00
KAIG3-RFI-CF-S-10994 00 KAIG3-RFI-CF-S-10994-00
KAIG3-RFI-CO-C-09930 00 KAIG3-RFI-CO-C-09930-00
KAIG3-RFI-MC-C-09931 00 KAIG3-RFI-MC-C-09931-00
KAIG3-RFI-CO-C-09894 00 KAIG3-RFI-CO-C-09894-00
KAIG3-RFI-CO-SU-03521 00 KAIG3-RFI-CO-SU-03521-00
KAIG3-RFI-CO-SU-03522 00 KAIG3-RFI-CO-SU-03522-00
KAIG3-RFI-SW-C-9965 00 KAIG3-RFI-SW-C-9965-00
KAIG3-RFI-CC-SU-03523 00 KAIG3-RFI-CC-SU-03523-00
KAIG3-RFI-SW-C-9964 00 KAIG3-RFI-SW-C-9964-00
KAIG3-RFI-SW-C-9963 00 KAIG3-RFI-SW-C-9963-00
KAIG3-RFI-CO-SU-03520 00 KAIG3-RFI-CO-SU-03520-00
KAIG3-RFI-SW-C-9962 00 KAIG3-RFI-SW-C-9962-00
KAIG3-RFI-SW-C-9961 00 KAIG3-RFI-SW-C-9961-00
KAIG3-RFI-SW-C-9966 00 KAIG3-RFI-SW-C-9966-00
KAIG3-RFI-SW-C-9953 00 KAIG3-RFI-SW-C-9953-00
KAIG3-RFI-SW-C-9952 00 KAIG3-RFI-SW-C-9952-00
KAIG3-RFI-SW-C-9951 00 KAIG3-RFI-SW-C-9951-00
KAIG3-RFI-SW-C-9950 00 KAIG3-RFI-SW-C-9950-00
KAIG3-RFI-SW-C-9949 00 KAIG3-RFI-SW-C-9949-00
KAIG3-RFI-SW-C-9948 00 KAIG3-RFI-SW-C-9948-00
KAIG3-RFI-SW-C-9947 00 KAIG3-RFI-SW-C-9947-00
KAIG3-RFI-PC-SU-03518 00 KAIG3-RFI-PC-SU-03518-00
KAIG3-RFI-CO-SU-03519 00 KAIG3-RFI-CO-SU-03519-00
KAIG3-RFI-CO-S-10984 00 KAIG3-RFI-CO-S-10984-00
KAIG3-RFI-CO-S-10985 00 KAIG3-RFI-CO-S-10985-00
KAIG3-RFI-CO-S-10986 00 KAIG3-RFI-CO-S-10986-00
KAIG3-RFI-CO-S-10987 00 KAIG3-RFI-CO-S-10987-00
KAIG3-RFI-SW-LS-1870 00 KAIG3-RFI-SW-LS-1870-00
KAIG3-RFI-SW-C-9937 00 KAIG3-RFI-SW-C-9937-00
KAIG3-RFI-CC-S-10989 00 KAIG3-RFI-CC-S-10989-00
KAIG3-RFI-SW-C-9936 00 KAIG3-RFI-SW-C-9936-00
KAIG3-RFI-SW-C-9946 00 KAIG3-RFI-SW-C-9946-00
KAIG3-RFI-SW-C-9945 00 KAIG3-RFI-SW-C-9945-00
KAIG3-RFI-CO-S-10939 00 KAIG3-RFI-CO-S-10939-00
KAIG3-RFI-SW-C-9944 00 KAIG3-RFI-SW-C-9944-00
KAIG3-RFI-SW-C-9939 00 KAIG3-RFI-SW-C-9939-00
KAIG3-RFI-SW-C-9938 00 KAIG3-RFI-SW-C-9938-00
KAIG3-RFI-MC-S-10980 00 KAIG3-RFI-MC-S-10980-00
KAIG3-RFI-SW-C-9935 00 KAIG3-RFI-SW-C-9935-00
KAIG3-RFI-SW-C-9915 00 KAIG3-RFI-SW-C-9915-00
KAIG3-RFI-SW-C-9914 00 KAIG3-RFI-SW-C-9914-00
KAIG3-RFI-SW-C-9913 00 KAIG3-RFI-SW-C-9913-00
KAIG3-RFI-SW-C-9912 00 KAIG3-RFI-SW-C-9912-00
KAIG3-RFI-SW-C-9911 00 KAIG3-RFI-SW-C-9911-00
KAIG3-RFI-SW-C-9910 00 KAIG3-RFI-SW-C-9910-00
KAIG3-RFI-SW-C-9909 00 KAIG3-RFI-SW-C-9909-00
KAIG3-RFI-SW-C-9640 01 KAIG3-RFI-SW-C-9640-01
KAIG3-RFI-CO-S-10978 00 KAIG3-RFI-CO-S-10978-00
KAIG3-RFI-CO-S-10979 00 KAIG3-RFI-CO-S-10979-00
KAIG3-RFI-CO-S-10981 00 KAIG3-RFI-CO-S-10981-00
KAIG3-RFI-CO-S-10982 00 KAIG3-RFI-CO-S-10982-00
KAIG3-RFI-CO-S-10983 00 KAIG3-RFI-CO-S-10983-00
KAIG3-RFI-SA-S-10960 00 KAIG3-RFI-SA-S-10960-00
KAIG3-RFI-CO-S-10735 00 KAIG3-RFI-CO-S-10735-00
KAIG3-RFI-CO-S-10787 00 KAIG3-RFI-CO-S-10787-00
KAIG3-RFI-CO-S-10791 00 KAIG3-RFI-CO-S-10791-00
KAIG3-RFI-CO-S-10792 00 KAIG3-RFI-CO-S-10792-00
KAIG3-RFI-CO-S-10317 00 KAIG3-RFI-CO-S-10317-00
KAIG3-RFI-CO-S-10971 00 KAIG3-RFI-CO-S-10971-00
KAIG3-RFI-CO-S-10972 00 KAIG3-RFI-CO-S-10972-00
KAIG3-RFI-PC-S-10973 00 KAIG3-RFI-PC-S-10973-00
KAIG3-RFI-MC-S-10974 00 KAIG3-RFI-MC-S-10974-00
KAIG3-RFI-CO-S-10975 00 KAIG3-RFI-CO-S-10975-00
KAIG3-RFI-CO-S-10976 00 KAIG3-RFI-CO-S-10976-00
KAIG3-RFI-CO-S-10977 00 KAIG3-RFI-CO-S-10977-00
KAIG3-RFI-TT-A-1366 00 KAIG3-RFI-TT-A-1366-00
KAIG3-RFI-PG-C-9924 00 KAIG3-RFI-PG-C-9924-00
KAIG3-RFI-PG-C-9940 00 KAIG3-RFI-PG-C-9940-00
KAIG3-RFI-WG-C-9934 00 KAIG3-RFI-WG-C-9934-00
KAIG3-RFI-PG-SU-3524 00 KAIG3-RFI-PG-SU-3524-00
KAIG3-RFI-DG-S-10964 00 KAIG3-RFI-DG-S-10964-00
KAIG3-RFI-TB-S-10991 00 KAIG3-RFI-TB-S-10991-00
KAIG3-RFI-MB-S-10990 00 KAIG3-RFI-MB-S-10990-00
KAIG3-RFI-WG-LS-1869 00 KAIG3-RFI-WG-LS-1869-00
KAIG3-RFI-WG-LS-1868 00 KAIG3-RFI-WG-LS-1868-00
KAIG3-RFI-PC-LS-1872 00 KAIG3-RFI-PC-LS-1872-00
KAIG3-RFI-SW-LS-1871 00 KAIG3-RFI-SW-LS-1871-00
KAIG3-RFI-SW-C-9943 00 KAIG3-RFI-SW-C-9943-00
KAIG3-RFI-SW-C-9942 00 KAIG3-RFI-SW-C-9942-00
KAIG3-RFI-SW-C-8806 01 KAIG3-RFI-SW-C-8806-01
KAIG3-RFI-SW-C-8346 01 KAIG3-RFI-SW-C-8346-01
KAIG3-RFI-SW-C-7645 01 KAIG3-RFI-SW-C-7645-01
KAIG3-RFI-PG-C-9933 00 KAIG3-RFI-PG-C-9933-00
KAIG3-RFI-PG-C-9925 00 KAIG3-RFI-PG-C-9925-00
KAIG3-RFI-TT-SU-3491 01 KAIG3-RFI-TT-SU-3491-01
KAIG3-RFI-SW-E-0722 01 KAIG3-RFI-SW-E-0722-01
KAIG3-RFI-SW-E-0747 00 KAIG3-RFI-SW-E-0747-00
KAIG3-RFI-SW-M-0436 00 KAIG3-RFI-SW-M-0436-00
KAIG3-RFI-SW-E-0746 00 KAIG3-RFI-SW-E-0746-00
KAIG3-RFI-CO-A-1351 01 KAIG3-RFI-CO-A-1351-01
KAIG3-RFI-CO-A-1281 01 KAIG3-RFI-CO-A-1281-01
KAIG3-RFI-SW-C-9927 00 KAIG3-RFI-SW-C-9927-00
KAIG3-RFI-SW-C-9929 00 KAIG3-RFI-SW-C-9929-00
KAIG3-RFI-SW-C-9926 00 KAIG3-RFI-SW-C-9926-00
KAIG3-RFI-SW-C-9921 00 KAIG3-RFI-SW-C-9921-00
KAIG3-RFI-SW-C-9920 00 KAIG3-RFI-SW-C-9920-00
KAIG3-RFI-SW-C-9906 00 KAIG3-RFI-SW-C-9906-00
KAIG3-RFI-SW-C-9905 00 KAIG3-RFI-SW-C-9905-00
KAIG3-RFI-SW-C-9890 00 KAIG3-RFI-SW-C-9890-00
KAIG3-RFI-SW-C-9889 00 KAIG3-RFI-SW-C-9889-00
KAIG3-RFI-SW-C-9840 01 KAIG3-RFI-SW-C-9840-01
KAIG3-RFI-WG-C-9932 00 KAIG3-RFI-WG-C-9932-00
KAIG3-RFI-SW-M-0435 00 KAIG3-RFI-SW-M-0435-00
KAIG3-RFI-SW-P-0433 01 KAIG3-RFI-SW-P-0433-01
KAIG3-RFI-SW-P-0432 01 KAIG3-RFI-SW-P-0432-01
KAIG3-RFI-DG-SU-3516 00 KAIG3-RFI-DG-SU-3516-00
KAIG3-RFI-WG-C-9918 00 KAIG3-RFI-WG-C-9918-00
KAIG3-RFI-WG-C-9822 01 KAIG3-RFI-WG-C-9822-01
KAIG3-RFI-TG-E-0404 02 KAIG3-RFI-TG-E-0404-02
KAIG3-RFI-VG-S-9521 00 KAIG3-RFI-VG-S-9521-00
KAIG3-RFI-NA-LC-0968 00 KAIG3-RFI-NA-LC-0968-00
KAIG3-RFI-NA-LC-0967 00 KAIG3-RFI-NA-LC-0967-00
KAIG3-RFI-SW-C-9919 00 KAIG3-RFI-SW-C-9919-00
KAIG3-RFI-SW-C-9903 00 KAIG3-RFI-SW-C-9903-00
KAIG3-RFI-SW-C-9318 01 KAIG3-RFI-SW-C-9318-01
KAIG3-RFI-SW-C-7458 01 KAIG3-RFI-SW-C-7458-01
KAIG3-RFI-PA-LS-1867 00 KAIG3-RFI-PA-LS-1867-00
KAIG3-RFI-PA-LS-1866 00 KAIG3-RFI-PA-LS-1866-00
KAIG3-RFI-PA-C-9917 00 KAIG3-RFI-PA-C-9917-00
KAIG3-RFI-PA-C-9916 00 KAIG3-RFI-PA-C-9916-00
KAIG3-RFI-PA-C-9904 00 KAIG3-RFI-PA-C-9904-00
KAIG3-RFI-CO-E-0717 01 KAIG3-RFI-CO-E-0717-01
KAIG3-RFI-CO-E-0715 01 KAIG3-RFI-CO-E-0715-01
KAIG3-RFI-CO-E-0716 01 KAIG3-RFI-CO-E-0716-01
KAIG3-RFI-AG-E-0712 01 KAIG3-RFI-AG-E-0712-01
KAIG3-RFI-CC-M-0434 00 KAIG3-RFI-CC-M-0434-00
KAIG3-RFI-CO-C-09902 00 KAIG3-RFI-CO-C-09902-00
KAIG3-RFI-MC-C-09817 00 KAIG3-RFI-MC-C-09817-00
KAIG3-RFI-CC-C-09896 00 KAIG3-RFI-CC-C-09896-00
KAIG3-RFI-CO-C-09897 00 KAIG3-RFI-CO-C-09897-00
KAIG3-RFI-NA-S-10970 00 KAIG3-RFI-NA-S-10970-00
KAIG3-RFI-CO-S-10962 00 KAIG3-RFI-CO-S-10962-00
KAIG3-RFI-CO-S-10963 00 KAIG3-RFI-CO-S-10963-00
KAIG3-RFI-NA-S-10968 00 KAIG3-RFI-NA-S-10968-00
KAIG3-RFI-NA-S-10969 00 KAIG3-RFI-NA-S-10969-00
KAIG3-RFI-MC-S-10967 00 KAIG3-RFI-MC-S-10967-00
KAIG3-RFI-MC-S-10966 00 KAIG3-RFI-MC-S-10966-00
KAIG3-RFI-MC-S-10965 00 KAIG3-RFI-MC-S-10965-00
KAIG3-RFI-MC-S-10951 00 KAIG3-RFI-MC-S-10951-00
KAIG3-RFI-MC-S-10952 00 KAIG3-RFI-MC-S-10952-00
KAIG3-RFI-MC-S-10953 00 KAIG3-RFI-MC-S-10953-00
KAIG3-RFI-CO-S-10956 00 KAIG3-RFI-CO-S-10956-00
KAIG3-RFI-CO-S-10954 00 KAIG3-RFI-CO-S-10954-00
KAIG3-RFI-PC-S-10955 00 KAIG3-RFI-PC-S-10955-00
KAIG3-RFI-CO-S-9691 00 KAIG3-RFI-CO-S-9691-00
KAIG3-RFI-CO-SU-03515 00 KAIG3-RFI-CO-SU-03515-00
KAIG3-RFI-MC-SU-03517 00 KAIG3-RFI-MC-SU-03517-00
KAIG3-RFI-NA-SU-03511 00 KAIG3-RFI-NA-SU-03511-00
KAIG3-RFI-SW-C-9923 00 KAIG3-RFI-SW-C-9923-00
KAIG3-RFI-SW-C-9922 00 KAIG3-RFI-SW-C-9922-00
KAIG3-RFI-EC-S-10926 00 KAIG3-RFI-EC-S-10926-00
KAIG3-RFI-SG-LC-0974 00 KAIG3-RFI-SG-LC-0974-00
KAIG3-RFI-SW-E-0743 00 KAIG3-RFI-SW-E-0743-00
KAIG3-RFI-SW-E-0742 00 KAIG3-RFI-SW-E-0742-00
KAIG3-RFI-SW-E-0741 00 KAIG3-RFI-SW-E-0741-00
KAIG3-RFI-SW-LS-1863 00 KAIG3-RFI-SW-LS-1863-00
KAIG3-RFI-SW-LS-1862 00 KAIG3-RFI-SW-LS-1862-00
KAIG3-RFI-SW-LS-1861 00 KAIG3-RFI-SW-LS-1861-00
KAIG3-RFI-SW-LS-1860 00 KAIG3-RFI-SW-LS-1860-00
KAIG3-RFI-SW-LS-1859 00 KAIG3-RFI-SW-LS-1859-00
KAIG3-RFI-SW-LS-1858 00 KAIG3-RFI-SW-LS-1858-00
KAIG3-RFI-SW-LS-1857 00 KAIG3-RFI-SW-LS-1857-00
KAIG3-RFI-SW-LS-1856 00 KAIG3-RFI-SW-LS-1856-00
KAIG3-RFI-SW-LS-1855 00 KAIG3-RFI-SW-LS-1855-00
KAIG3-RFI-SW-LS-1854 00 KAIG3-RFI-SW-LS-1854-00
KAIG3-RFI-SW-LS-1853 00 KAIG3-RFI-SW-LS-1853-00
KAIG3-RFI-SW-LS-1852 00 KAIG3-RFI-SW-LS-1852-00
KAIG3-RFI-SW-LS-1851 00 KAIG3-RFI-SW-LS-1851-00
KAIG3-RFI-SW-LS-1850 00 KAIG3-RFI-SW-LS-1850-00
KAIG3-RFI-SW-LS-1849 00 KAIG3-RFI-SW-LS-1849-00
KAIG3-RFI-SW-LS-1848 00 KAIG3-RFI-SW-LS-1848-00
KAIG3-RFI-WG-C-9895 00 KAIG3-RFI-WG-C-9895-00
KAIG3-RFI-SW-C-9900 00 KAIG3-RFI-SW-C-9900-00
KAIG3-RFI-SW-C-9899 00 KAIG3-RFI-SW-C-9899-00
KAIG3-RFI-SW-LS-1865 00 KAIG3-RFI-SW-LS-1865-00
KAIG3-RFI-SW-C-9898 00 KAIG3-RFI-SW-C-9898-00
KAIG3-RFI-SW-LS-1864 00 KAIG3-RFI-SW-LS-1864-00
KAIG3-RFI-SW-C-9870 00 KAIG3-RFI-SW-C-9870-00
KAIG3-RFI-SW-C-9869 00 KAIG3-RFI-SW-C-9869-00
KAIG3-RFI-SW-C-9868 00 KAIG3-RFI-SW-C-9868-00
KAIG3-RFI-SW-C-9867 00 KAIG3-RFI-SW-C-9867-00
KAIG3-RFI-SW-C-9892 00 KAIG3-RFI-SW-C-9892-00
KAIG3-RFI-SW-C-9866 00 KAIG3-RFI-SW-C-9866-00
KAIG3-RFI-SW-C-9891 00 KAIG3-RFI-SW-C-9891-00
KAIG3-RFI-SW-C-9865 00 KAIG3-RFI-SW-C-9865-00
KAIG3-RFI-TB-S-10961 00 KAIG3-RFI-TB-S-10961-00
KAIG3-RFI-PG-S-10959 00 KAIG3-RFI-PG-S-10959-00
KAIG3-RFI-PG-S-10958 00 KAIG3-RFI-PG-S-10958-00
KAIG3-RFI-PG-S-10957 00 KAIG3-RFI-PG-S-10957-00
KAIG3-RFI-AG-S-10950 00 KAIG3-RFI-AG-S-10950-00
KAIG3-RFI-PG-SU-3514 00 KAIG3-RFI-PG-SU-3514-00
KAIG3-RFI-PG-SU-3513 00 KAIG3-RFI-PG-SU-3513-00
KAIG3-RFI-PG-SU-3512 00 KAIG3-RFI-PG-SU-3512-00
KAIG3-RFI-SG-LC-0973 00 KAIG3-RFI-SG-LC-0973-00
KAIG3-RFI-AG-SU-3510 00 KAIG3-RFI-AG-SU-3510-00
KAIG3-RFI-WG-C-9901 00 KAIG3-RFI-WG-C-9901-00
KAIG3-RFI-DG-LC-0972 00 KAIG3-RFI-DG-LC-0972-00
KAIG3-RFI-WG-C-9893 00 KAIG3-RFI-WG-C-9893-00
KAIG3-RFI-PG-E-0745 00 KAIG3-RFI-PG-E-0745-00
KAIG3-RFI-DG-E-0744 00 KAIG3-RFI-DG-E-0744-00
KAIG3-RFI-DG-LC-0971 00 KAIG3-RFI-DG-LC-0971-00
KAIG3-RFI-PG-LC-0970 00 KAIG3-RFI-PG-LC-0970-00
KAIG3-RFI-PG-LC-0969 00 KAIG3-RFI-PG-LC-0969-00
KAIG3-RFI-TT-E-0738 00 KAIG3-RFI-TT-E-0738-00
KAIG3-RFI-SW-C-9883 00 KAIG3-RFI-SW-C-9883-00
KAIG3-RFI-SW-C-9888 00 KAIG3-RFI-SW-C-9888-00
KAIG3-RFI-SW-E-0710 02 KAIG3-RFI-SW-E-0710-02
KAIG3-RFI-SW-C-9887 00 KAIG3-RFI-SW-C-9887-00
KAIG3-RFI-SW-C-9886 00 KAIG3-RFI-SW-C-9886-00
KAIG3-RFI-SW-C-9885 00 KAIG3-RFI-SW-C-9885-00
KAIG3-RFI-SW-C-9884 00 KAIG3-RFI-SW-C-9884-00
KAIG3-RFI-SW-C-9881 00 KAIG3-RFI-SW-C-9881-00
KAIG3-RFI-SW-C-9880 00 KAIG3-RFI-SW-C-9880-00
KAIG3-RFI-SW-C-9879 00 KAIG3-RFI-SW-C-9879-00
KAIG3-RFI-SW-C-9871 00 KAIG3-RFI-SW-C-9871-00
KAIG3-RFI-SW-C-9864 00 KAIG3-RFI-SW-C-9864-00
KAIG3-RFI-SW-C-9863 00 KAIG3-RFI-SW-C-9863-00
KAIG3-RFI-FC-LC-0960 01 KAIG3-RFI-FC-LC-0960-01
KAIG3-RFI-SW-C-9861 00 KAIG3-RFI-SW-C-9861-00
KAIG3-RFI-FC-LC-0959 01 KAIG3-RFI-FC-LC-0959-01
KAIG3-RFI-SW-E-0740 00 KAIG3-RFI-SW-E-0740-00
KAIG3-RFI-SW-E-0739 00 KAIG3-RFI-SW-E-0739-00
KAIG3-RFI-PG-S-10949 00 KAIG3-RFI-PG-S-10949-00
KAIG3-RFI-PG-S-10948 00 KAIG3-RFI-PG-S-10948-00
KAIG3-RFI-SW-C-9862 00 KAIG3-RFI-SW-C-9862-00
KAIG3-RFI-SW-C-9840 00 KAIG3-RFI-SW-C-9840-00
KAIG3-RFI-SW-C-9839 00 KAIG3-RFI-SW-C-9839-00
KAIG3-RFI-SW-P-0433 00 KAIG3-RFI-SW-P-0433-00
KAIG3-RFI-SA-SU-03486 01 KAIG3-RFI-SA-SU-03486-01
KAIG3-RFI-CO-SU-03508 00 KAIG3-RFI-CO-SU-03508-00
KAIG3-RFI-MC-SU-03509 00 KAIG3-RFI-MC-SU-03509-00
KAIG3-RFI-NG-C-9876 00 KAIG3-RFI-NG-C-9876-00
KAIG3-RFI-CO-SU-03507 00 KAIG3-RFI-CO-SU-03507-00
KAIG3-RFI-CG-C-9878 00 KAIG3-RFI-CG-C-9878-00
KAIG3-RFI-CO-S-10946 00 KAIG3-RFI-CO-S-10946-00
KAIG3-RFI-CO-S-10947 00 KAIG3-RFI-CO-S-10947-00
KAIG3-RFI-CO-S-10837 01 KAIG3-RFI-CO-S-10837-01
KAIG3-RFI-NG-C-9875 00 KAIG3-RFI-NG-C-9875-00
KAIG3-RFI-CO-S-10793 01 KAIG3-RFI-CO-S-10793-01
KAIG3-RFI-CG-C-9877 00 KAIG3-RFI-CG-C-9877-00
KAIG3-RFI-CO-S-10655 01 KAIG3-RFI-CO-S-10655-01
KAIG3-RFI-CO-S-10943 00 KAIG3-RFI-CO-S-10943-00
KAIG3-RFI-CO-S-10944 00 KAIG3-RFI-CO-S-10944-00
KAIG3-RFI-CO-S-10945 00 KAIG3-RFI-CO-S-10945-00
KAIG3-RFI-CO-S-10940 00 KAIG3-RFI-CO-S-10940-00
KAIG3-RFI-CO-S-10941 00 KAIG3-RFI-CO-S-10941-00
KAIG3-RFI-SA-S-10942 00 KAIG3-RFI-SA-S-10942-00
KAIG3-RFI-CO-S-10623 01 KAIG3-RFI-CO-S-10623-01
KAIG3-RFI-SW-P-0432 00 KAIG3-RFI-SW-P-0432-00
KAIG3-RFI-NA-P-0429 00 KAIG3-RFI-NA-P-0429-00
KAIG3-RFI-WG-C-9882 00 KAIG3-RFI-WG-C-9882-00
KAIG3-RFI-DG-C-9873 00 KAIG3-RFI-DG-C-9873-00
KAIG3-RFI-AG-LS-1847 00 KAIG3-RFI-AG-LS-1847-00
KAIG3-RFI-WG-LS-1846 00 KAIG3-RFI-WG-LS-1846-00
KAIG3-RFI-WG-LS-1845 00 KAIG3-RFI-WG-LS-1845-00
KAIG3-RFI-CO-SU-03506 00 KAIG3-RFI-CO-SU-03506-00
KAIG3-RFI-SA-SU-03505 00 KAIG3-RFI-SA-SU-03505-00
KAIG3-RFI-LM-SU-03504 00 KAIG3-RFI-LM-SU-03504-00
KAIG3-RFI-CO-SU-03503 00 KAIG3-RFI-CO-SU-03503-00
KAIG3-RFI-CO-C-09872 00 KAIG3-RFI-CO-C-09872-00
KAIG3-RFI-LM-S-10934 00 KAIG3-RFI-LM-S-10934-00
KAIG3-RFI-SA-S-10936 00 KAIG3-RFI-SA-S-10936-00
KAIG3-RFI-CO-S-10938 00 KAIG3-RFI-CO-S-10938-00
KAIG3-RFI-CO-S-10931 00 KAIG3-RFI-CO-S-10931-00
KAIG3-RFI-CO-S-10932 00 KAIG3-RFI-CO-S-10932-00
KAIG3-RFI-CO-S-10933 00 KAIG3-RFI-CO-S-10933-00
KAIG3-RFI-SW-LC-0966 00 KAIG3-RFI-SW-LC-0966-00
KAIG3-RFI-SW-LS-1844 00 KAIG3-RFI-SW-LS-1844-00
KAIG3-RFI-SW-LS-1843 00 KAIG3-RFI-SW-LS-1843-00
KAIG3-RFI-SW-LS-1842 00 KAIG3-RFI-SW-LS-1842-00
KAIG3-RFI-SW-C-9860 00 KAIG3-RFI-SW-C-9860-00
KAIG3-RFI-SW-C-9838 00 KAIG3-RFI-SW-C-9838-00
KAIG3-RFI-SW-C-9837 00 KAIG3-RFI-SW-C-9837-00
KAIG3-RFI-SW-C-9738 01 KAIG3-RFI-SW-C-9738-01
KAIG3-RFI-SW-LC-0965 00 KAIG3-RFI-SW-LC-0965-00
KAIG3-RFI-PG-E-0670 01 KAIG3-RFI-PG-E-0670-01
KAIG3-RFI-FC-E-0736 00 KAIG3-RFI-FC-E-0736-00
KAIG3-RFI-FC-E-0735 00 KAIG3-RFI-FC-E-0735-00
KAIG3-RFI-SW-M-0431 00 KAIG3-RFI-SW-M-0431-00
KAIG3-RFI-TT-LC-0962 00 KAIG3-RFI-TT-LC-0962-00
KAIG3-RFI-TT-LC-0963 00 KAIG3-RFI-TT-LC-0963-00
KAIG3-RFI-TT-LC-0964 00 KAIG3-RFI-TT-LC-0964-00
KAIG3-RFI-WG-LS-1841 00 KAIG3-RFI-WG-LS-1841-00
KAIG3-RFI-WG-LS-1840 00 KAIG3-RFI-WG-LS-1840-00
KAIG3-RFI-SW-C-9836 00 KAIG3-RFI-SW-C-9836-00
KAIG3-RFI-SW-C-9835 00 KAIG3-RFI-SW-C-9835-00
KAIG3-RFI-SW-C-9648 01 KAIG3-RFI-SW-C-9648-01
KAIG3-RFI-SW-C-9647 01 KAIG3-RFI-SW-C-9647-01
KAIG3-RFI-SW-C-9643 01 KAIG3-RFI-SW-C-9643-01
KAIG3-RFI-WG-LS-1839 00 KAIG3-RFI-WG-LS-1839-00
KAIG3-RFI-WG-LS-1838 00 KAIG3-RFI-WG-LS-1838-00
KAIG3-RFI-RD-C-7290 03 KAIG3-RFI-RD-C-7290-03
KAIG3-RFI-FC-A-1359 00 KAIG3-RFI-FC-A-1359-00
KAIG3-RFI-TG-S-10930 00 KAIG3-RFI-TG-S-10930-00
KAIG3-RFI-AG-S-10929 00 KAIG3-RFI-AG-S-10929-00
KAIG3-RFI-WG-LS-1837 00 KAIG3-RFI-WG-LS-1837-00
KAIG3-RFI-SW-C-9853 00 KAIG3-RFI-SW-C-9853-00
KAIG3-RFI-SW-C-9852 00 KAIG3-RFI-SW-C-9852-00
KAIG3-RFI-SW-C-9851 00 KAIG3-RFI-SW-C-9851-00
KAIG3-RFI-SW-C-9846 00 KAIG3-RFI-SW-C-9846-00
KAIG3-RFI-WG-C-9859 00 KAIG3-RFI-WG-C-9859-00
KAIG3-RFI-WG-C-9858 00 KAIG3-RFI-WG-C-9858-00
KAIG3-RFI-SW-C-9845 00 KAIG3-RFI-SW-C-9845-00
KAIG3-RFI-WG-C-9857 00 KAIG3-RFI-WG-C-9857-00
KAIG3-RFI-SW-C-9843 00 KAIG3-RFI-SW-C-9843-00
KAIG3-RFI-SW-C-9842 00 KAIG3-RFI-SW-C-9842-00
KAIG3-RFI-SW-C-9841 00 KAIG3-RFI-SW-C-9841-00
KAIG3-RFI-SW-C-9834 00 KAIG3-RFI-SW-C-9834-00
KAIG3-RFI-SW-C-9833 00 KAIG3-RFI-SW-C-9833-00
KAIG3-RFI-SW-C-9832 00 KAIG3-RFI-SW-C-9832-00
KAIG3-RFI-SW-C-9831 00 KAIG3-RFI-SW-C-9831-00
KAIG3-RFI-SW-C-9830 00 KAIG3-RFI-SW-C-9830-00
KAIG3-RFI-SW-C-9829 00 KAIG3-RFI-SW-C-9829-00
KAIG3-RFI-SW-C-9828 00 KAIG3-RFI-SW-C-9828-00
KAIG3-RFI-PG-C-9850 00 KAIG3-RFI-PG-C-9850-00
KAIG3-RFI-SW-C-9827 00 KAIG3-RFI-SW-C-9827-00
KAIG3-RFI-WG-C-9849 00 KAIG3-RFI-WG-C-9849-00
KAIG3-RFI-SW-C-9826 00 KAIG3-RFI-SW-C-9826-00
KAIG3-RFI-SW-C-9825 00 KAIG3-RFI-SW-C-9825-00
KAIG3-RFI-WG-C-9848 00 KAIG3-RFI-WG-C-9848-00
KAIG3-RFI-SW-C-9815 00 KAIG3-RFI-SW-C-9815-00
KAIG3-RFI-PG-C-9847 00 KAIG3-RFI-PG-C-9847-00
KAIG3-RFI-SW-C-9790 00 KAIG3-RFI-SW-C-9790-00
KAIG3-RFI-DG-C-9824 00 KAIG3-RFI-DG-C-9824-00
KAIG3-RFI-WG-C-9821 00 KAIG3-RFI-WG-C-9821-00
KAIG3-RFI-TG-SU-3502 00 KAIG3-RFI-TG-SU-3502-00
KAIG3-RFI-PG-SU-3497 00 KAIG3-RFI-PG-SU-3497-00
KAIG3-RFI-PC-P-0428 00 KAIG3-RFI-PC-P-0428-00
KAIG3-RFI-SW-LS-1832 00 KAIG3-RFI-SW-LS-1832-00
KAIG3-RFI-MC-C-09856 00 KAIG3-RFI-MC-C-09856-00
KAIG3-RFI-CO-C-09855 00 KAIG3-RFI-CO-C-09855-00
KAIG3-RFI-CO-C-09854 00 KAIG3-RFI-CO-C-09854-00
KAIG3-RFI-NA-A-01358 00 KAIG3-RFI-NA-A-01358-00
KAIG3-RFI-CO-SU-03501 00 KAIG3-RFI-CO-SU-03501-00
KAIG3-RFI-CO-S-10863 00 KAIG3-RFI-CO-S-10863-00
KAIG3-RFI-EC-S-10927 00 KAIG3-RFI-EC-S-10927-00
KAIG3-RFI-NA-S-10918 00 KAIG3-RFI-NA-S-10918-00
KAIG3-RFI-NA-S-10917 00 KAIG3-RFI-NA-S-10917-00
KAIG3-RFI-CO-S-10898 00 KAIG3-RFI-CO-S-10898-00
KAIG3-RFI-CO-S-10899 00 KAIG3-RFI-CO-S-10899-00
KAIG3-RFI-SW-E-0737 00 KAIG3-RFI-SW-E-0737-00
KAIG3-RFI-CO-S-10900 00 KAIG3-RFI-CO-S-10900-00
KAIG3-RFI-SW-E-0734 00 KAIG3-RFI-SW-E-0734-00
KAIG3-RFI-CO-S-10901 00 KAIG3-RFI-CO-S-10901-00
KAIG3-RFI-SW-E-0733 00 KAIG3-RFI-SW-E-0733-00
KAIG3-RFI-PC-E-0732 00 KAIG3-RFI-PC-E-0732-00
KAIG3-RFI-CO-S-10925 00 KAIG3-RFI-CO-S-10925-00
KAIG3-RFI-NA-S-10923 00 KAIG3-RFI-NA-S-10923-00
KAIG3-RFI-EC-S-10928 00 KAIG3-RFI-EC-S-10928-00
KAIG3-RFI-NA-S-10919 00 KAIG3-RFI-NA-S-10919-00
KAIG3-RFI-NA-S-10916 00 KAIG3-RFI-NA-S-10916-00
KAIG3-RFI-CO-S-10924 00 KAIG3-RFI-CO-S-10924-00
KAIG3-RFI-CO-S-10922 00 KAIG3-RFI-CO-S-10922-00
KAIG3-RFI-NA-S-10921 00 KAIG3-RFI-NA-S-10921-00
KAIG3-RFI-NA-S-10920 00 KAIG3-RFI-NA-S-10920-00
KAIG3-RFI-MC-C-09844 00 KAIG3-RFI-MC-C-09844-00
KAIG3-RFI-CO-SU-03500 00 KAIG3-RFI-CO-SU-03500-00
KAIG3-RFI-CO-SU-03499 00 KAIG3-RFI-CO-SU-03499-00
KAIG3-RFI-CO-S-10911 00 KAIG3-RFI-CO-S-10911-00
KAIG3-RFI-CO-S-10912 00 KAIG3-RFI-CO-S-10912-00
KAIG3-RFI-CO-S-10913 00 KAIG3-RFI-CO-S-10913-00
KAIG3-RFI-SA-LC-0961 00 KAIG3-RFI-SA-LC-0961-00
KAIG3-RFI-FC-LC-0960 00 KAIG3-RFI-FC-LC-0960-00
KAIG3-RFI-SA-S-10910 00 KAIG3-RFI-SA-S-10910-00
KAIG3-RFI-CO-S-10915 00 KAIG3-RFI-CO-S-10915-00
KAIG3-RFI-NA-S-10914 00 KAIG3-RFI-NA-S-10914-00
KAIG3-RFI-FC-LC-0959 00 KAIG3-RFI-FC-LC-0959-00
KAIG3-RFI-CO-S-10905 00 KAIG3-RFI-CO-S-10905-00
KAIG3-RFI-CO-S-10906 00 KAIG3-RFI-CO-S-10906-00
KAIG3-RFI-CO-S-10907 00 KAIG3-RFI-CO-S-10907-00
KAIG3-RFI-CO-S-10908 00 KAIG3-RFI-CO-S-10908-00
KAIG3-RFI-CO-S-10909 00 KAIG3-RFI-CO-S-10909-00
KAIG3-RFI-SA-LC-0958 00 KAIG3-RFI-SA-LC-0958-00
KAIG3-RFI-PC-LC-0957 00 KAIG3-RFI-PC-LC-0957-00
KAIG3-RFI-CO-S-10902 00 KAIG3-RFI-CO-S-10902-00
KAIG3-RFI-CO-S-10903 00 KAIG3-RFI-CO-S-10903-00
KAIG3-RFI-CO-S-10904 00 KAIG3-RFI-CO-S-10904-00
KAIG3-RFI-CF-S-10659 00 KAIG3-RFI-CF-S-10659-00
KAIG3-RFI-CF-S-10782 00 KAIG3-RFI-CF-S-10782-00
KAIG3-RFI-CO-S-10723 00 KAIG3-RFI-CO-S-10723-00
KAIG3-RFI-CO-S-10756 00 KAIG3-RFI-CO-S-10756-00
KAIG3-RFI-CO-SU-03469 00 KAIG3-RFI-CO-SU-03469-00
KAIG3-RFI-PG-C-9823 00 KAIG3-RFI-PG-C-9823-00
KAIG3-RFI-WG-C-9822 00 KAIG3-RFI-WG-C-9822-00
KAIG3-RFI-WG-C-9820 00 KAIG3-RFI-WG-C-9820-00
KAIG3-RFI-WG-C-9819 00 KAIG3-RFI-WG-C-9819-00
KAIG3-RFI-WG-C-9818 00 KAIG3-RFI-WG-C-9818-00
KAIG3-RFI-PG-S-10892 00 KAIG3-RFI-PG-S-10892-00
KAIG3-RFI-PG-S-10891 00 KAIG3-RFI-PG-S-10891-00
KAIG3-RFI-WG-S-10890 00 KAIG3-RFI-WG-S-10890-00
KAIG3-RFI-PG-S-10889 00 KAIG3-RFI-PG-S-10889-00
KAIG3-RFI-TB-S-10893 00 KAIG3-RFI-TB-S-10893-00
KAIG3-RFI-TB-SU-3498 00 KAIG3-RFI-TB-SU-3498-00
KAIG3-RFI-TG-E-0706 01 KAIG3-RFI-TG-E-0706-01
KAIG3-RFI-SW-M-0427 00 KAIG3-RFI-SW-M-0427-00
KAIG3-RFI-SW-M-0426 00 KAIG3-RFI-SW-M-0426-00
KAIG3-RFI-SW-M-0414 01 KAIG3-RFI-SW-M-0414-01
KAIG3-RFI-SW-LS-1836 00 KAIG3-RFI-SW-LS-1836-00
KAIG3-RFI-SW-LS-1835 00 KAIG3-RFI-SW-LS-1835-00
KAIG3-RFI-PC-SU-03495 00 KAIG3-RFI-PC-SU-03495-00
KAIG3-RFI-EC-SU-03496 00 KAIG3-RFI-EC-SU-03496-00
KAIG3-RFI-CO-SU-03493 00 KAIG3-RFI-CO-SU-03493-00
KAIG3-RFI-CO-SU-03494 00 KAIG3-RFI-CO-SU-03494-00
KAIG3-RFI-CO-SU-03450 01 KAIG3-RFI-CO-SU-03450-01
KAIG3-RFI-SW-C-9789 00 KAIG3-RFI-SW-C-9789-00
KAIG3-RFI-MC-C-09793 00 KAIG3-RFI-MC-C-09793-00
KAIG3-RFI-SW-C-9788 00 KAIG3-RFI-SW-C-9788-00
KAIG3-RFI-MC-C-09792 00 KAIG3-RFI-MC-C-09792-00
KAIG3-RFI-SW-C-9787 00 KAIG3-RFI-SW-C-9787-00
KAIG3-RFI-PC-S-10884 00 KAIG3-RFI-PC-S-10884-00
KAIG3-RFI-PC-S-10885 00 KAIG3-RFI-PC-S-10885-00
KAIG3-RFI-PC-S-10886 00 KAIG3-RFI-PC-S-10886-00
KAIG3-RFI-SW-C-9786 00 KAIG3-RFI-SW-C-9786-00
KAIG3-RFI-EC-S-10887 00 KAIG3-RFI-EC-S-10887-00
KAIG3-RFI-SW-C-9785 00 KAIG3-RFI-SW-C-9785-00
KAIG3-RFI-EC-S-10888 00 KAIG3-RFI-EC-S-10888-00
KAIG3-RFI-SW-C-9784 00 KAIG3-RFI-SW-C-9784-00
KAIG3-RFI-SW-C-9614 01 KAIG3-RFI-SW-C-9614-01
KAIG3-RFI-CO-S-10894 00 KAIG3-RFI-CO-S-10894-00
KAIG3-RFI-CO-S-10879 00 KAIG3-RFI-CO-S-10879-00
KAIG3-RFI-CO-S-10880 00 KAIG3-RFI-CO-S-10880-00
KAIG3-RFI-CO-S-10881 00 KAIG3-RFI-CO-S-10881-00
KAIG3-RFI-CO-S-10882 00 KAIG3-RFI-CO-S-10882-00
KAIG3-RFI-CO-S-10883 00 KAIG3-RFI-CO-S-10883-00
KAIG3-RFI-WG-C-9816 00 KAIG3-RFI-WG-C-9816-00
KAIG3-RFI-SW-C-9814 00 KAIG3-RFI-SW-C-9814-00
KAIG3-RFI-SW-C-9813 00 KAIG3-RFI-SW-C-9813-00
KAIG3-RFI-SW-M-0425 00 KAIG3-RFI-SW-M-0425-00
KAIG3-RFI-SW-M-0423 00 KAIG3-RFI-SW-M-0423-00
KAIG3-RFI-PG-C-9811 00 KAIG3-RFI-PG-C-9811-00
KAIG3-RFI-PG-C-9810 00 KAIG3-RFI-PG-C-9810-00
KAIG3-RFI-WG-C-9809 00 KAIG3-RFI-WG-C-9809-00
KAIG3-RFI-WG-C-9808 00 KAIG3-RFI-WG-C-9808-00
KAIG3-RFI-WG-C-9807 00 KAIG3-RFI-WG-C-9807-00
KAIG3-RFI-WG-C-9806 00 KAIG3-RFI-WG-C-9806-00
KAIG3-RFI-WG-LS-1834 00 KAIG3-RFI-WG-LS-1834-00
KAIG3-RFI-TT-SU-3491 00 KAIG3-RFI-TT-SU-3491-00
KAIG3-RFI-SW-C-9800 00 KAIG3-RFI-SW-C-9800-00
KAIG3-RFI-SW-C-9799 00 KAIG3-RFI-SW-C-9799-00
KAIG3-RFI-EC-SU-03492 00 KAIG3-RFI-EC-SU-03492-00
KAIG3-RFI-CO-SU-03489 00 KAIG3-RFI-CO-SU-03489-00
KAIG3-RFI-CO-SU-03490 00 KAIG3-RFI-CO-SU-03490-00
KAIG3-RFI-SW-C-9798 00 KAIG3-RFI-SW-C-9798-00
KAIG3-RFI-SW-C-9812 00 KAIG3-RFI-SW-C-9812-00
KAIG3-RFI-PC-SU-03475 00 KAIG3-RFI-PC-SU-03475-00
KAIG3-RFI-SW-C-9797 00 KAIG3-RFI-SW-C-9797-00
KAIG3-RFI-SW-C-9805 00 KAIG3-RFI-SW-C-9805-00
KAIG3-RFI-SW-C-9794 00 KAIG3-RFI-SW-C-9794-00
KAIG3-RFI-SW-C-9791 00 KAIG3-RFI-SW-C-9791-00
KAIG3-RFI-SW-C-9783 00 KAIG3-RFI-SW-C-9783-00
KAIG3-RFI-SW-C-9796 00 KAIG3-RFI-SW-C-9796-00
KAIG3-RFI-SW-C-9782 00 KAIG3-RFI-SW-C-9782-00
KAIG3-RFI-MC-C-09801 00 KAIG3-RFI-MC-C-09801-00
KAIG3-RFI-SW-C-9781 00 KAIG3-RFI-SW-C-9781-00
KAIG3-RFI-CO-C-09804 00 KAIG3-RFI-CO-C-09804-00
KAIG3-RFI-SW-C-9780 00 KAIG3-RFI-SW-C-9780-00
KAIG3-RFI-SW-C-9795 00 KAIG3-RFI-SW-C-9795-00
KAIG3-RFI-CO-C-09803 00 KAIG3-RFI-CO-C-09803-00
KAIG3-RFI-SW-C-9779 00 KAIG3-RFI-SW-C-9779-00
KAIG3-RFI-SW-C-9778 00 KAIG3-RFI-SW-C-9778-00
KAIG3-RFI-CO-C-09802 00 KAIG3-RFI-CO-C-09802-00
KAIG3-RFI-SW-C-9777 00 KAIG3-RFI-SW-C-9777-00
KAIG3-RFI-SW-C-9776 00 KAIG3-RFI-SW-C-9776-00
KAIG3-RFI-EC-S-10875 00 KAIG3-RFI-EC-S-10875-00
KAIG3-RFI-SW-C-9775 00 KAIG3-RFI-SW-C-9775-00
KAIG3-RFI-EC-S-10876 00 KAIG3-RFI-EC-S-10876-00
KAIG3-RFI-CO-S-10867 00 KAIG3-RFI-CO-S-10867-00
KAIG3-RFI-SW-C-9774 00 KAIG3-RFI-SW-C-9774-00
KAIG3-RFI-CO-S-10866 00 KAIG3-RFI-CO-S-10866-00
KAIG3-RFI-SW-C-9773 00 KAIG3-RFI-SW-C-9773-00
KAIG3-RFI-CO-S-10865 00 KAIG3-RFI-CO-S-10865-00
KAIG3-RFI-SW-C-9770 00 KAIG3-RFI-SW-C-9770-00
KAIG3-RFI-CO-S-10874 00 KAIG3-RFI-CO-S-10874-00
KAIG3-RFI-SW-C-9769 00 KAIG3-RFI-SW-C-9769-00
KAIG3-RFI-CO-S-10862 00 KAIG3-RFI-CO-S-10862-00
KAIG3-RFI-SW-C-9768 00 KAIG3-RFI-SW-C-9768-00
KAIG3-RFI-CO-S-10861 00 KAIG3-RFI-CO-S-10861-00
KAIG3-RFI-SW-C-9767 00 KAIG3-RFI-SW-C-9767-00
KAIG3-RFI-SW-C-9740 00 KAIG3-RFI-SW-C-9740-00
KAIG3-RFI-CO-S-10870 00 KAIG3-RFI-CO-S-10870-00
KAIG3-RFI-SW-C-9739 00 KAIG3-RFI-SW-C-9739-00
KAIG3-RFI-CO-S-10869 00 KAIG3-RFI-CO-S-10869-00
KAIG3-RFI-SW-C-9642 01 KAIG3-RFI-SW-C-9642-01
KAIG3-RFI-PA-C-9772 00 KAIG3-RFI-PA-C-9772-00
KAIG3-RFI-CO-S-10868 00 KAIG3-RFI-CO-S-10868-00
KAIG3-RFI-PA-C-9771 00 KAIG3-RFI-PA-C-9771-00
KAIG3-RFI-CO-S-10864 00 KAIG3-RFI-CO-S-10864-00
KAIG3-RFI-SA-S-10877 00 KAIG3-RFI-SA-S-10877-00
KAIG3-RFI-CO-S-10793 00 KAIG3-RFI-CO-S-10793-00
KAIG3-RFI-TG-LC-0947 01 KAIG3-RFI-TG-LC-0947-01
KAIG3-RFI-TG-LC-0946 01 KAIG3-RFI-TG-LC-0946-01
KAIG3-RFI-TG-S-10878 00 KAIG3-RFI-TG-S-10878-00
KAIG3-RFI-TT-S-10873 00 KAIG3-RFI-TT-S-10873-00
KAIG3-RFI-PG-S-10872 00 KAIG3-RFI-PG-S-10872-00
KAIG3-RFI-TT-S-10871 00 KAIG3-RFI-TT-S-10871-00
KAIG3-RFI-WG-C-9761 00 KAIG3-RFI-WG-C-9761-00
KAIG3-RFI-PG-C-9595 01 KAIG3-RFI-PG-C-9595-01
KAIG3-RFI-WG-S-10860 00 KAIG3-RFI-WG-S-10860-00
KAIG3-RFI-WG-S-10859 00 KAIG3-RFI-WG-S-10859-00
KAIG3-RFI-WG-S-10858 00 KAIG3-RFI-WG-S-10858-00
KAIG3-RFI-WG-S-10857 00 KAIG3-RFI-WG-S-10857-00
KAIG3-RFI-WG-S-10856 00 KAIG3-RFI-WG-S-10856-00
KAIG3-RFI-FC-A-1357 00 KAIG3-RFI-FC-A-1357-00
KAIG3-RFI-TB-S-10816 00 KAIG3-RFI-TB-S-10816-00
KAIG3-RFI-AG-C-9706 00 KAIG3-RFI-AG-C-9706-00
KAIG3-RFI-WG-C-9757 00 KAIG3-RFI-WG-C-9757-00
KAIG3-RFI-WG-C-9755 00 KAIG3-RFI-WG-C-9755-00
KAIG3-RFI-WG-C-9754 00 KAIG3-RFI-WG-C-9754-00
KAIG3-RFI-WG-C-9753 00 KAIG3-RFI-WG-C-9753-00
KAIG3-RFI-WG-C-9752 00 KAIG3-RFI-WG-C-9752-00
KAIG3-RFI-DG-C-9744 00 KAIG3-RFI-DG-C-9744-00
KAIG3-RFI-PG-C-9743 00 KAIG3-RFI-PG-C-9743-00
KAIG3-RFI-PG-C-9742 00 KAIG3-RFI-PG-C-9742-00
KAIG3-RFI-TG-C-9741 00 KAIG3-RFI-TG-C-9741-00
KAIG3-RFI-DG-LS-1829 00 KAIG3-RFI-DG-LS-1829-00
KAIG3-RFI-TB-E-0689 01 KAIG3-RFI-TB-E-0689-01
KAIG3-RFI-SW-E-0731 00 KAIG3-RFI-SW-E-0731-00
KAIG3-RFI-SW-E-0730 00 KAIG3-RFI-SW-E-0730-00
KAIG3-RFI-SW-E-0710 01 KAIG3-RFI-SW-E-0710-01
KAIG3-RFI-SW-E-0687 01 KAIG3-RFI-SW-E-0687-01
KAIG3-RFI-SW-E-0686 01 KAIG3-RFI-SW-E-0686-01
KAIG3-RFI-SW-E-0725 00 KAIG3-RFI-SW-E-0725-00
KAIG3-RFI-SW-E-0723 00 KAIG3-RFI-SW-E-0723-00
KAIG3-RFI-TT-LC-0956 00 KAIG3-RFI-TT-LC-0956-00
KAIG3-RFI-NA-C-09762 00 KAIG3-RFI-NA-C-09762-00
KAIG3-RFI-CO-C-09764 00 KAIG3-RFI-CO-C-09764-00
KAIG3-RFI-MC-C-09763 00 KAIG3-RFI-MC-C-09763-00
KAIG3-RFI-SA-SU-03486 00 KAIG3-RFI-SA-SU-03486-00
KAIG3-RFI-CO-SU-03485 00 KAIG3-RFI-CO-SU-03485-00
KAIG3-RFI-CO-SU-03487 00 KAIG3-RFI-CO-SU-03487-00
KAIG3-RFI-CO-SU-03482 00 KAIG3-RFI-CO-SU-03482-00
KAIG3-RFI-CO-SU-03478 00 KAIG3-RFI-CO-SU-03478-00
KAIG3-RFI-MC-SU-03488 00 KAIG3-RFI-MC-SU-03488-00
KAIG3-RFI-EC-SU-03484 00 KAIG3-RFI-EC-SU-03484-00
KAIG3-RFI-CO-SU-03483 00 KAIG3-RFI-CO-SU-03483-00
KAIG3-RFI-CO-SU-03479 00 KAIG3-RFI-CO-SU-03479-00
KAIG3-RFI-CO-SU-03481 00 KAIG3-RFI-CO-SU-03481-00
KAIG3-RFI-SW-C-9760 00 KAIG3-RFI-SW-C-9760-00
KAIG3-RFI-CO-SU-03480 00 KAIG3-RFI-CO-SU-03480-00
KAIG3-RFI-NA-SU-03477 00 KAIG3-RFI-NA-SU-03477-00
KAIG3-RFI-CO-SU-03476 00 KAIG3-RFI-CO-SU-03476-00
KAIG3-RFI-SW-C-9759 00 KAIG3-RFI-SW-C-9759-00
KAIG3-RFI-PC-S-10833 00 KAIG3-RFI-PC-S-10833-00
KAIG3-RFI-PC-S-10834 00 KAIG3-RFI-PC-S-10834-00
KAIG3-RFI-PC-S-10835 00 KAIG3-RFI-PC-S-10835-00
KAIG3-RFI-SW-C-9758 00 KAIG3-RFI-SW-C-9758-00
KAIG3-RFI-CO-S-10849 00 KAIG3-RFI-CO-S-10849-00
KAIG3-RFI-CO-S-10850 00 KAIG3-RFI-CO-S-10850-00
KAIG3-RFI-EC-S-10851 00 KAIG3-RFI-EC-S-10851-00
KAIG3-RFI-SW-C-9738 00 KAIG3-RFI-SW-C-9738-00
KAIG3-RFI-SW-C-9737 00 KAIG3-RFI-SW-C-9737-00
KAIG3-RFI-SA-S-10852 00 KAIG3-RFI-SA-S-10852-00
KAIG3-RFI-SW-C-9736 00 KAIG3-RFI-SW-C-9736-00
KAIG3-RFI-CO-S-10844 00 KAIG3-RFI-CO-S-10844-00
KAIG3-RFI-SW-C-9735 00 KAIG3-RFI-SW-C-9735-00
KAIG3-RFI-CO-S-10836 00 KAIG3-RFI-CO-S-10836-00
KAIG3-RFI-SW-C-9734 00 KAIG3-RFI-SW-C-9734-00
KAIG3-RFI-CO-S-10837 00 KAIG3-RFI-CO-S-10837-00
KAIG3-RFI-SW-C-9733 00 KAIG3-RFI-SW-C-9733-00
KAIG3-RFI-PC-S-10832 00 KAIG3-RFI-PC-S-10832-00
KAIG3-RFI-SW-C-9732 00 KAIG3-RFI-SW-C-9732-00
KAIG3-RFI-SW-C-9731 00 KAIG3-RFI-SW-C-9731-00
KAIG3-RFI-MC-S-10854 00 KAIG3-RFI-MC-S-10854-00
KAIG3-RFI-SW-C-9730 00 KAIG3-RFI-SW-C-9730-00
KAIG3-RFI-MC-S-10855 00 KAIG3-RFI-MC-S-10855-00
KAIG3-RFI-SW-C-9729 00 KAIG3-RFI-SW-C-9729-00
KAIG3-RFI-EC-S-10848 00 KAIG3-RFI-EC-S-10848-00
KAIG3-RFI-SW-C-9728 00 KAIG3-RFI-SW-C-9728-00
KAIG3-RFI-CO-S-10845 00 KAIG3-RFI-CO-S-10845-00
KAIG3-RFI-SW-C-9727 00 KAIG3-RFI-SW-C-9727-00
KAIG3-RFI-CO-S-10846 00 KAIG3-RFI-CO-S-10846-00
KAIG3-RFI-CO-S-10838 00 KAIG3-RFI-CO-S-10838-00
KAIG3-RFI-SW-C-9726 00 KAIG3-RFI-SW-C-9726-00
KAIG3-RFI-CO-S-10839 00 KAIG3-RFI-CO-S-10839-00
KAIG3-RFI-SW-C-9725 00 KAIG3-RFI-SW-C-9725-00
KAIG3-RFI-SW-C-9724 00 KAIG3-RFI-SW-C-9724-00
KAIG3-RFI-CO-S-10842 00 KAIG3-RFI-CO-S-10842-00
KAIG3-RFI-SW-M-0422 00 KAIG3-RFI-SW-M-0422-00
KAIG3-RFI-CO-S-10843 00 KAIG3-RFI-CO-S-10843-00
KAIG3-RFI-SW-C-9720 00 KAIG3-RFI-SW-C-9720-00
KAIG3-RFI-CO-S-10840 00 KAIG3-RFI-CO-S-10840-00
KAIG3-RFI-CO-S-10841 00 KAIG3-RFI-CO-S-10841-00
KAIG3-RFI-MC-S-10853 00 KAIG3-RFI-MC-S-10853-00
KAIG3-RFI-SW-LS-1830 00 KAIG3-RFI-SW-LS-1830-00
KAIG3-RFI-NA-S-10830 00 KAIG3-RFI-NA-S-10830-00
KAIG3-RFI-CO-S-10831 00 KAIG3-RFI-CO-S-10831-00
KAIG3-RFI-CO-S-10826 00 KAIG3-RFI-CO-S-10826-00
KAIG3-RFI-CO-S-10827 00 KAIG3-RFI-CO-S-10827-00
KAIG3-RFI-CO-S-10828 00 KAIG3-RFI-CO-S-10828-00
KAIG3-RFI-NA-S-10829 00 KAIG3-RFI-NA-S-10829-00
KAIG3-RFI-EC-SS-00453 00 KAIG3-RFI-EC-SS-00453-00
KAIG3-RFI-CO-S-10817 00 KAIG3-RFI-CO-S-10817-00
KAIG3-RFI-WG-C-9766 00 KAIG3-RFI-WG-C-9766-00
KAIG3-RFI-WG-C-9765 00 KAIG3-RFI-WG-C-9765-00
KAIG3-RFI-SW-LS-1833 00 KAIG3-RFI-SW-LS-1833-00
KAIG3-RFI-SW-LS-1831 00 KAIG3-RFI-SW-LS-1831-00
KAIG3-RFI-SW-P-0421 00 KAIG3-RFI-SW-P-0421-00
KAIG3-RFI-SW-P-0420 00 KAIG3-RFI-SW-P-0420-00
KAIG3-RFI-SA-P-0419 00 KAIG3-RFI-SA-P-0419-00
KAIG3-RFI-GC-LC-0945 01 KAIG3-RFI-GC-LC-0945-01
KAIG3-RFI-GC-LC-0944 01 KAIG3-RFI-GC-LC-0944-01
KAIG3-RFI-ZG-LC-0955 00 KAIG3-RFI-ZG-LC-0955-00
KAIG3-RFI-SW-C-9756 00 KAIG3-RFI-SW-C-9756-00
KAIG3-RFI-SW-C-9723 00 KAIG3-RFI-SW-C-9723-00
KAIG3-RFI-SW-C-9722 00 KAIG3-RFI-SW-C-9722-00
KAIG3-RFI-SW-C-9719 00 KAIG3-RFI-SW-C-9719-00
KAIG3-RFI-WG-E-0729 00 KAIG3-RFI-WG-E-0729-00
KAIG3-RFI-SW-C-9718 00 KAIG3-RFI-SW-C-9718-00
KAIG3-RFI-SW-C-9717 00 KAIG3-RFI-SW-C-9717-00
KAIG3-RFI-PG-E-0728 00 KAIG3-RFI-PG-E-0728-00
KAIG3-RFI-CO-SU-03474 00 KAIG3-RFI-CO-SU-03474-00
KAIG3-RFI-PG-E-0727 00 KAIG3-RFI-PG-E-0727-00
KAIG3-RFI-EC-C-09747 00 KAIG3-RFI-EC-C-09747-00
KAIG3-RFI-MC-C-09748 00 KAIG3-RFI-MC-C-09748-00
KAIG3-RFI-CO-C-09749 00 KAIG3-RFI-CO-C-09749-00
KAIG3-RFI-MC-C-09750 00 KAIG3-RFI-MC-C-09750-00
KAIG3-RFI-CO-C-09751 00 KAIG3-RFI-CO-C-09751-00
KAIG3-RFI-MC-C-09715 00 KAIG3-RFI-MC-C-09715-00
KAIG3-RFI-MC-C-09716 00 KAIG3-RFI-MC-C-09716-00
KAIG3-RFI-CO-C-7744 01 KAIG3-RFI-CO-C-7744-01
KAIG3-RFI-SW-C-9690 00 KAIG3-RFI-SW-C-9690-00
KAIG3-RFI-SW-C-9746 00 KAIG3-RFI-SW-C-9746-00
KAIG3-RFI-SW-C-9689 00 KAIG3-RFI-SW-C-9689-00
KAIG3-RFI-SW-C-9688 00 KAIG3-RFI-SW-C-9688-00
KAIG3-RFI-SW-C-9745 00 KAIG3-RFI-SW-C-9745-00
KAIG3-RFI-SW-C-9687 00 KAIG3-RFI-SW-C-9687-00
KAIG3-RFI-SW-C-9615 00 KAIG3-RFI-SW-C-9615-00
KAIG3-RFI-PA-C-9721 00 KAIG3-RFI-PA-C-9721-00
KAIG3-RFI-CC-S-10801 00 KAIG3-RFI-CC-S-10801-00
KAIG3-RFI-SA-S-10821 00 KAIG3-RFI-SA-S-10821-00
KAIG3-RFI-EC-S-10820 00 KAIG3-RFI-EC-S-10820-00
KAIG3-RFI-CO-S-10825 00 KAIG3-RFI-CO-S-10825-00
KAIG3-RFI-PC-S-10824 00 KAIG3-RFI-PC-S-10824-00
KAIG3-RFI-CO-S-10823 00 KAIG3-RFI-CO-S-10823-00
KAIG3-RFI-CC-P-0418 00 KAIG3-RFI-CC-P-0418-00
KAIG3-RFI-CO-S-10822 00 KAIG3-RFI-CO-S-10822-00
KAIG3-RFI-MC-S-10703 01 KAIG3-RFI-MC-S-10703-01
KAIG3-RFI-EC-S-10819 00 KAIG3-RFI-EC-S-10819-00
KAIG3-RFI-EC-S-10818 00 KAIG3-RFI-EC-S-10818-00
KAIG3-RFI-MC-S-10692 01 KAIG3-RFI-MC-S-10692-01
KAIG3-RFI-CO-S-10736 00 KAIG3-RFI-CO-S-10736-00
KAIG3-RFI-CO-S-10790 00 KAIG3-RFI-CO-S-10790-00
KAIG3-RFI-CO-S-10789 00 KAIG3-RFI-CO-S-10789-00
KAIG3-RFI-CO-S-10737 00 KAIG3-RFI-CO-S-10737-00
KAIG3-RFI-CO-S-10301 00 KAIG3-RFI-CO-S-10301-00
KAIG3-RFI-MC-S-10691 01 KAIG3-RFI-MC-S-10691-01
KAIG3-RFI-MC-S-10619 01 KAIG3-RFI-MC-S-10619-01
KAIG3-RFI-MC-S-10813 00 KAIG3-RFI-MC-S-10813-00
KAIG3-RFI-MC-S-10814 00 KAIG3-RFI-MC-S-10814-00
KAIG3-RFI-MC-S-10815 00 KAIG3-RFI-MC-S-10815-00
KAIG3-RFI-MC-S-10806 00 KAIG3-RFI-MC-S-10806-00
KAIG3-RFI-NA-S-10509 00 KAIG3-RFI-NA-S-10509-00
KAIG3-RFI-SW-E-0695 00 KAIG3-RFI-SW-E-0695-00
KAIG3-RFI-TG-C-9714 00 KAIG3-RFI-TG-C-9714-00
KAIG3-RFI-WG-C-9713 00 KAIG3-RFI-WG-C-9713-00
KAIG3-RFI-WG-C-9708 00 KAIG3-RFI-WG-C-9708-00
KAIG3-RFI-WG-S-10804 00 KAIG3-RFI-WG-S-10804-00
KAIG3-RFI-WG-S-10803 00 KAIG3-RFI-WG-S-10803-00
KAIG3-RFI-SW-E-0718 00 KAIG3-RFI-SW-E-0718-00
KAIG3-RFI-SW-E-0726 00 KAIG3-RFI-SW-E-0726-00
KAIG3-RFI-SW-E-0724 00 KAIG3-RFI-SW-E-0724-00
KAIG3-RFI-CO-E-0717 00 KAIG3-RFI-CO-E-0717-00
KAIG3-RFI-CO-E-0716 00 KAIG3-RFI-CO-E-0716-00
KAIG3-RFI-CO-E-0715 00 KAIG3-RFI-CO-E-0715-00
KAIG3-RFI-CO-E-0714 00 KAIG3-RFI-CO-E-0714-00
KAIG3-RFI-CO-E-0713 00 KAIG3-RFI-CO-E-0713-00
KAIG3-RFI-AG-E-0712 00 KAIG3-RFI-AG-E-0712-00
KAIG3-RFI-GC-LC-0954 00 KAIG3-RFI-GC-LC-0954-00
KAIG3-RFI-GC-LC-0953 00 KAIG3-RFI-GC-LC-0953-00
KAIG3-RFI-SW-C-9707 00 KAIG3-RFI-SW-C-9707-00
KAIG3-RFI-SW-C-9702 00 KAIG3-RFI-SW-C-9702-00
KAIG3-RFI-SW-C-9699 00 KAIG3-RFI-SW-C-9699-00
KAIG3-RFI-SW-C-9686 00 KAIG3-RFI-SW-C-9686-00
KAIG3-RFI-SW-C-9685 00 KAIG3-RFI-SW-C-9685-00
KAIG3-RFI-SW-C-9684 00 KAIG3-RFI-SW-C-9684-00
KAIG3-RFI-SW-C-9683 00 KAIG3-RFI-SW-C-9683-00
KAIG3-RFI-SW-C-9682 00 KAIG3-RFI-SW-C-9682-00
KAIG3-RFI-SW-C-9681 00 KAIG3-RFI-SW-C-9681-00
KAIG3-RFI-SW-C-9680 00 KAIG3-RFI-SW-C-9680-00
KAIG3-RFI-SW-C-9679 00 KAIG3-RFI-SW-C-9679-00
KAIG3-RFI-SW-C-9678 00 KAIG3-RFI-SW-C-9678-00
KAIG3-RFI-SW-C-9677 00 KAIG3-RFI-SW-C-9677-00
KAIG3-RFI-WG-P-0417 00 KAIG3-RFI-WG-P-0417-00
KAIG3-RFI-SW-C-9676 00 KAIG3-RFI-SW-C-9676-00
KAIG3-RFI-SW-C-9675 00 KAIG3-RFI-SW-C-9675-00
KAIG3-RFI-SW-C-9674 00 KAIG3-RFI-SW-C-9674-00
KAIG3-RFI-SW-C-9673 00 KAIG3-RFI-SW-C-9673-00
KAIG3-RFI-SW-LS-1828 00 KAIG3-RFI-SW-LS-1828-00
KAIG3-RFI-SW-C-9672 00 KAIG3-RFI-SW-C-9672-00
KAIG3-RFI-SW-C-9658 00 KAIG3-RFI-SW-C-9658-00
KAIG3-RFI-SW-C-9651 00 KAIG3-RFI-SW-C-9651-00
KAIG3-RFI-SW-LS-1827 00 KAIG3-RFI-SW-LS-1827-00
KAIG3-RFI-SW-LS-1825 00 KAIG3-RFI-SW-LS-1825-00
KAIG3-RFI-SW-LS-1824 00 KAIG3-RFI-SW-LS-1824-00
KAIG3-RFI-SW-LS-1823 00 KAIG3-RFI-SW-LS-1823-00
KAIG3-RFI-CO-C-09710 00 KAIG3-RFI-CO-C-09710-00
KAIG3-RFI-SW-LS-1822 00 KAIG3-RFI-SW-LS-1822-00
KAIG3-RFI-MC-C-09709 00 KAIG3-RFI-MC-C-09709-00
KAIG3-RFI-CO-C-09712 00 KAIG3-RFI-CO-C-09712-00
KAIG3-RFI-CO-C-09711 00 KAIG3-RFI-CO-C-09711-00
KAIG3-RFI-MC-SU-03471 00 KAIG3-RFI-MC-SU-03471-00
KAIG3-RFI-MC-SU-03417 01 KAIG3-RFI-MC-SU-03417-01
KAIG3-RFI-MC-SU-03472 00 KAIG3-RFI-MC-SU-03472-00
KAIG3-RFI-CO-SU-03473 00 KAIG3-RFI-CO-SU-03473-00
KAIG3-RFI-SW-C-9671 00 KAIG3-RFI-SW-C-9671-00
KAIG3-RFI-MC-S-10620 01 KAIG3-RFI-MC-S-10620-01
KAIG3-RFI-SW-C-9670 00 KAIG3-RFI-SW-C-9670-00
KAIG3-RFI-MC-S-10809 00 KAIG3-RFI-MC-S-10809-00
KAIG3-RFI-MC-S-10618 01 KAIG3-RFI-MC-S-10618-01
KAIG3-RFI-SW-C-9669 00 KAIG3-RFI-SW-C-9669-00
KAIG3-RFI-SW-C-9668 00 KAIG3-RFI-SW-C-9668-00
KAIG3-RFI-MC-S-10805 00 KAIG3-RFI-MC-S-10805-00
KAIG3-RFI-MC-S-10802 00 KAIG3-RFI-MC-S-10802-00
KAIG3-RFI-SW-C-9667 00 KAIG3-RFI-SW-C-9667-00
KAIG3-RFI-SW-C-9666 00 KAIG3-RFI-SW-C-9666-00
KAIG3-RFI-MC-S-10808 00 KAIG3-RFI-MC-S-10808-00
KAIG3-RFI-MC-S-10807 00 KAIG3-RFI-MC-S-10807-00
KAIG3-RFI-SW-C-9665 00 KAIG3-RFI-SW-C-9665-00
KAIG3-RFI-SW-C-9664 00 KAIG3-RFI-SW-C-9664-00
KAIG3-RFI-SW-C-9660 00 KAIG3-RFI-SW-C-9660-00
KAIG3-RFI-SW-C-9659 00 KAIG3-RFI-SW-C-9659-00
KAIG3-RFI-SW-C-9657 00 KAIG3-RFI-SW-C-9657-00
KAIG3-RFI-SW-C-9656 00 KAIG3-RFI-SW-C-9656-00
KAIG3-RFI-CO-S-10812 00 KAIG3-RFI-CO-S-10812-00
KAIG3-RFI-SW-C-9655 00 KAIG3-RFI-SW-C-9655-00
KAIG3-RFI-SW-C-9654 00 KAIG3-RFI-SW-C-9654-00
KAIG3-RFI-CO-S-10811 00 KAIG3-RFI-CO-S-10811-00
KAIG3-RFI-SW-C-9653 00 KAIG3-RFI-SW-C-9653-00
KAIG3-RFI-CO-S-10810 00 KAIG3-RFI-CO-S-10810-00
KAIG3-RFI-SW-C-9652 00 KAIG3-RFI-SW-C-9652-00
KAIG3-RFI-CO-S-9762 01 KAIG3-RFI-CO-S-9762-01
KAIG3-RFI-SW-C-9385 01 KAIG3-RFI-SW-C-9385-01
KAIG3-RFI-SA-LC-0952 00 KAIG3-RFI-SA-LC-0952-00
KAIG3-RFI-TT-LC-0951 01 KAIG3-RFI-TT-LC-0951-01
KAIG3-RFI-TT-LC-0943 01 KAIG3-RFI-TT-LC-0943-01
KAIG3-RFI-TT-LC-0942 01 KAIG3-RFI-TT-LC-0942-01
KAIG3-RFI-SW-E-0722 00 KAIG3-RFI-SW-E-0722-00
KAIG3-RFI-SW-E-0721 00 KAIG3-RFI-SW-E-0721-00
KAIG3-RFI-CO-C-09695 00 KAIG3-RFI-CO-C-09695-00
KAIG3-RFI-MC-C-09696 00 KAIG3-RFI-MC-C-09696-00
KAIG3-RFI-MC-C-09693 00 KAIG3-RFI-MC-C-09693-00
KAIG3-RFI-MC-C-09694 00 KAIG3-RFI-MC-C-09694-00
KAIG3-RFI-MC-SU-03470 00 KAIG3-RFI-MC-SU-03470-00
KAIG3-RFI-CO-SU-03348 01 KAIG3-RFI-CO-SU-03348-01
KAIG3-RFI-LM-S-10498 00 KAIG3-RFI-LM-S-10498-00
KAIG3-RFI-LM-S-10494 00 KAIG3-RFI-LM-S-10494-00
KAIG3-RFI-MC-S-10799 00 KAIG3-RFI-MC-S-10799-00
KAIG3-RFI-CO-S-10733 00 KAIG3-RFI-CO-S-10733-00
KAIG3-RFI-LM-S-10699 00 KAIG3-RFI-LM-S-10699-00
KAIG3-RFI-CO-S-10796 00 KAIG3-RFI-CO-S-10796-00
KAIG3-RFI-MC-S-10797 00 KAIG3-RFI-MC-S-10797-00
KAIG3-RFI-CC-S-10800 00 KAIG3-RFI-CC-S-10800-00
KAIG3-RFI-CO-S-10614 01 KAIG3-RFI-CO-S-10614-01
KAIG3-RFI-CO-S-10761 00 KAIG3-RFI-CO-S-10761-00
KAIG3-RFI-CO-S-10760 00 KAIG3-RFI-CO-S-10760-00
KAIG3-RFI-CO-S-10759 00 KAIG3-RFI-CO-S-10759-00
KAIG3-RFI-CO-S-10680 01 KAIG3-RFI-CO-S-10680-01
KAIG3-RFI-CO-S-10786 00 KAIG3-RFI-CO-S-10786-00
KAIG3-RFI-CO-S-10785 00 KAIG3-RFI-CO-S-10785-00
KAIG3-RFI-CO-S-10783 00 KAIG3-RFI-CO-S-10783-00
KAIG3-RFI-MC-S-10798 00 KAIG3-RFI-MC-S-10798-00
KAIG3-RFI-NA-S-10777 00 KAIG3-RFI-NA-S-10777-00
KAIG3-RFI-CO-S-10770 00 KAIG3-RFI-CO-S-10770-00
KAIG3-RFI-CO-S-10419 01 KAIG3-RFI-CO-S-10419-01
KAIG3-RFI-CO-S-10421 00 KAIG3-RFI-CO-S-10421-00
KAIG3-RFI-PG-C-9704 00 KAIG3-RFI-PG-C-9704-00
KAIG3-RFI-WG-C-9701 00 KAIG3-RFI-WG-C-9701-00
KAIG3-RFI-WG-C-9700 00 KAIG3-RFI-WG-C-9700-00
KAIG3-RFI-PG-C-9698 00 KAIG3-RFI-PG-C-9698-00
KAIG3-RFI-PG-C-9697 00 KAIG3-RFI-PG-C-9697-00
KAIG3-RFI-WG-S-10795 00 KAIG3-RFI-WG-S-10795-00
KAIG3-RFI-WG-S-10794 00 KAIG3-RFI-WG-S-10794-00
KAIG3-RFI-SW-M-0416 00 KAIG3-RFI-SW-M-0416-00
KAIG3-RFI-WG-LS-1826 00 KAIG3-RFI-WG-LS-1826-00
KAIG3-RFI-WG-C-9692 00 KAIG3-RFI-WG-C-9692-00
KAIG3-RFI-WG-C-9691 00 KAIG3-RFI-WG-C-9691-00
KAIG3-RFI-SW-C-9705 00 KAIG3-RFI-SW-C-9705-00
KAIG3-RFI-SW-C-9703 00 KAIG3-RFI-SW-C-9703-00
KAIG3-RFI-NA-P-0415 00 KAIG3-RFI-NA-P-0415-00
KAIG3-RFI-TT-A-1356 00 KAIG3-RFI-TT-A-1356-00
KAIG3-RFI-SA-LC-0950 00 KAIG3-RFI-SA-LC-0950-00
KAIG3-RFI-SA-LC-0949 00 KAIG3-RFI-SA-LC-0949-00
KAIG3-RFI-AG-C-9631 00 KAIG3-RFI-AG-C-9631-00
KAIG3-RFI-WG-C-9624 00 KAIG3-RFI-WG-C-9624-00
KAIG3-RFI-PG-S-10677 01 KAIG3-RFI-PG-S-10677-01
KAIG3-RFI-TT-E-0720 00 KAIG3-RFI-TT-E-0720-00
KAIG3-RFI-TG-S-10758 00 KAIG3-RFI-TG-S-10758-00
KAIG3-RFI-SW-E-0719 00 KAIG3-RFI-SW-E-0719-00
KAIG3-RFI-SW-E-0711 00 KAIG3-RFI-SW-E-0711-00
KAIG3-RFI-SW-E-0710 00 KAIG3-RFI-SW-E-0710-00
KAIG3-RFI-TB-E-0689 00 KAIG3-RFI-TB-E-0689-00
KAIG3-RFI-TG-SU-3462 00 KAIG3-RFI-TG-SU-3462-00
KAIG3-RFI-EC-SU-03465 00 KAIG3-RFI-EC-SU-03465-00
KAIG3-RFI-EC-SU-03464 00 KAIG3-RFI-EC-SU-03464-00
KAIG3-RFI-CF-SU-03468 00 KAIG3-RFI-CF-SU-03468-00
KAIG3-RFI-CO-SU-03463 00 KAIG3-RFI-CO-SU-03463-00
KAIG3-RFI-CO-SU-03455 00 KAIG3-RFI-CO-SU-03455-00
KAIG3-RFI-CO-SU-03467 00 KAIG3-RFI-CO-SU-03467-00
KAIG3-RFI-NA-SU-03466 00 KAIG3-RFI-NA-SU-03466-00
KAIG3-RFI-CO-A-01355 00 KAIG3-RFI-CO-A-01355-00
KAIG3-RFI-CO-A-01354 00 KAIG3-RFI-CO-A-01354-00
KAIG3-RFI-CO-C-09663 00 KAIG3-RFI-CO-C-09663-00
KAIG3-RFI-CO-S-10665 00 KAIG3-RFI-CO-S-10665-00
KAIG3-RFI-EC-S-10774 00 KAIG3-RFI-EC-S-10774-00
KAIG3-RFI-EC-S-10775 00 KAIG3-RFI-EC-S-10775-00
KAIG3-RFI-EC-S-10772 00 KAIG3-RFI-EC-S-10772-00
KAIG3-RFI-EC-S-10773 00 KAIG3-RFI-EC-S-10773-00
KAIG3-RFI-CO-S-10754 00 KAIG3-RFI-CO-S-10754-00
KAIG3-RFI-CO-S-10753 00 KAIG3-RFI-CO-S-10753-00
KAIG3-RFI-CO-S-10771 00 KAIG3-RFI-CO-S-10771-00
KAIG3-RFI-CO-S-10654 01 KAIG3-RFI-CO-S-10654-01
KAIG3-RFI-CF-S-10781 00 KAIG3-RFI-CF-S-10781-00
KAIG3-RFI-CO-S-10769 00 KAIG3-RFI-CO-S-10769-00
KAIG3-RFI-CO-S-10768 00 KAIG3-RFI-CO-S-10768-00
KAIG3-RFI-NA-S-10738 00 KAIG3-RFI-NA-S-10738-00
KAIG3-RFI-CO-S-10734 00 KAIG3-RFI-CO-S-10734-00
KAIG3-RFI-CO-S-10779 00 KAIG3-RFI-CO-S-10779-00
KAIG3-RFI-CO-S-10778 00 KAIG3-RFI-CO-S-10778-00
KAIG3-RFI-NA-S-10776 00 KAIG3-RFI-NA-S-10776-00
KAIG3-RFI-SA-S-10780 00 KAIG3-RFI-SA-S-10780-00
KAIG3-RFI-SW-LS-1821 00 KAIG3-RFI-SW-LS-1821-00
KAIG3-RFI-SW-C-9630 00 KAIG3-RFI-SW-C-9630-00
KAIG3-RFI-SW-C-9629 00 KAIG3-RFI-SW-C-9629-00
KAIG3-RFI-TT-LC-0951 00 KAIG3-RFI-TT-LC-0951-00
KAIG3-RFI-SW-C-9649 00 KAIG3-RFI-SW-C-9649-00
KAIG3-RFI-SW-C-9648 00 KAIG3-RFI-SW-C-9648-00
KAIG3-RFI-SW-C-9647 00 KAIG3-RFI-SW-C-9647-00
KAIG3-RFI-SW-C-9646 00 KAIG3-RFI-SW-C-9646-00
KAIG3-RFI-SW-C-9645 00 KAIG3-RFI-SW-C-9645-00
KAIG3-RFI-SW-C-9644 00 KAIG3-RFI-SW-C-9644-00
KAIG3-RFI-SW-C-9643 00 KAIG3-RFI-SW-C-9643-00
KAIG3-RFI-SW-C-9642 00 KAIG3-RFI-SW-C-9642-00
KAIG3-RFI-SW-C-9641 00 KAIG3-RFI-SW-C-9641-00
KAIG3-RFI-SW-C-9640 00 KAIG3-RFI-SW-C-9640-00
KAIG3-RFI-SW-C-9639 00 KAIG3-RFI-SW-C-9639-00
KAIG3-RFI-SW-C-9638 00 KAIG3-RFI-SW-C-9638-00
KAIG3-RFI-SW-C-9637 00 KAIG3-RFI-SW-C-9637-00
KAIG3-RFI-SW-C-9636 00 KAIG3-RFI-SW-C-9636-00
KAIG3-RFI-SW-M-0414 00 KAIG3-RFI-SW-M-0414-00
KAIG3-RFI-SW-M-0413 00 KAIG3-RFI-SW-M-0413-00
KAIG3-RFI-SW-C-9650 00 KAIG3-RFI-SW-C-9650-00
KAIG3-RFI-SW-LS-1820 00 KAIG3-RFI-SW-LS-1820-00
KAIG3-RFI-SW-C-08680 01 KAIG3-RFI-SW-C-08680-01
KAIG3-RFI-SW-C-9485 00 KAIG3-RFI-SW-C-9485-00
KAIG3-RFI-MC-S-10535 01 KAIG3-RFI-MC-S-10535-01
KAIG3-RFI-CO-S-10590 01 KAIG3-RFI-CO-S-10590-01
KAIG3-RFI-CO-S-10743 00 KAIG3-RFI-CO-S-10743-00
KAIG3-RFI-CO-S-10744 00 KAIG3-RFI-CO-S-10744-00
KAIG3-RFI-SA-S-10750 00 KAIG3-RFI-SA-S-10750-00
KAIG3-RFI-NA-S-10731 00 KAIG3-RFI-NA-S-10731-00
KAIG3-RFI-CO-S-10749 00 KAIG3-RFI-CO-S-10749-00
KAIG3-RFI-CO-S-10748 00 KAIG3-RFI-CO-S-10748-00
KAIG3-RFI-CO-S-10746 00 KAIG3-RFI-CO-S-10746-00
KAIG3-RFI-CO-S-10747 00 KAIG3-RFI-CO-S-10747-00
KAIG3-RFI-CO-S-10660 00 KAIG3-RFI-CO-S-10660-00
KAIG3-RFI-CO-S-10661 00 KAIG3-RFI-CO-S-10661-00
KAIG3-RFI-CO-S-10739 00 KAIG3-RFI-CO-S-10739-00
KAIG3-RFI-CO-S-10740 00 KAIG3-RFI-CO-S-10740-00
KAIG3-RFI-CO-S-10696 00 KAIG3-RFI-CO-S-10696-00
KAIG3-RFI-CO-S-10697 00 KAIG3-RFI-CO-S-10697-00
KAIG3-RFI-CF-S-10745 00 KAIG3-RFI-CF-S-10745-00
KAIG3-RFI-NA-S-10732 00 KAIG3-RFI-NA-S-10732-00
KAIG3-RFI-CC-S-10755 00 KAIG3-RFI-CC-S-10755-00
KAIG3-RFI-CO-S-10752 00 KAIG3-RFI-CO-S-10752-00
KAIG3-RFI-CO-S-10751 00 KAIG3-RFI-CO-S-10751-00
KAIG3-RFI-CO-C-09625 00 KAIG3-RFI-CO-C-09625-00
KAIG3-RFI-EC-C-09592 00 KAIG3-RFI-EC-C-09592-00
KAIG3-RFI-PA-C-9635 00 KAIG3-RFI-PA-C-9635-00
KAIG3-RFI-MC-C-09627 00 KAIG3-RFI-MC-C-09627-00
KAIG3-RFI-MC-C-09626 00 KAIG3-RFI-MC-C-09626-00
KAIG3-RFI-CO-SU-03458 00 KAIG3-RFI-CO-SU-03458-00
KAIG3-RFI-NA-SU-03454 00 KAIG3-RFI-NA-SU-03454-00
KAIG3-RFI-CO-SU-03459 00 KAIG3-RFI-CO-SU-03459-00
KAIG3-RFI-SW-C-9633 00 KAIG3-RFI-SW-C-9633-00
KAIG3-RFI-SW-C-9620 00 KAIG3-RFI-SW-C-9620-00
KAIG3-RFI-SW-C-9619 00 KAIG3-RFI-SW-C-9619-00
KAIG3-RFI-SW-C-9618 00 KAIG3-RFI-SW-C-9618-00
KAIG3-RFI-SW-C-9617 00 KAIG3-RFI-SW-C-9617-00
KAIG3-RFI-SW-C-9616 00 KAIG3-RFI-SW-C-9616-00
KAIG3-RFI-SW-C-9614 00 KAIG3-RFI-SW-C-9614-00
KAIG3-RFI-SW-C-9613 00 KAIG3-RFI-SW-C-9613-00
KAIG3-RFI-SW-C-9612 00 KAIG3-RFI-SW-C-9612-00
KAIG3-RFI-SW-C-9611 00 KAIG3-RFI-SW-C-9611-00
KAIG3-RFI-SW-C-9610 00 KAIG3-RFI-SW-C-9610-00
KAIG3-RFI-SW-C-9608 00 KAIG3-RFI-SW-C-9608-00
KAIG3-RFI-SW-C-9607 00 KAIG3-RFI-SW-C-9607-00
KAIG3-RFI-CO-SU-03456 00 KAIG3-RFI-CO-SU-03456-00
KAIG3-RFI-SW-C-9606 00 KAIG3-RFI-SW-C-9606-00
KAIG3-RFI-CO-SU-03443 00 KAIG3-RFI-CO-SU-03443-00
KAIG3-RFI-SW-C-9605 00 KAIG3-RFI-SW-C-9605-00
KAIG3-RFI-SW-C-9604 00 KAIG3-RFI-SW-C-9604-00
KAIG3-RFI-CC-SU-03461 00 KAIG3-RFI-CC-SU-03461-00
KAIG3-RFI-SW-C-9603 00 KAIG3-RFI-SW-C-9603-00
KAIG3-RFI-SW-C-9602 00 KAIG3-RFI-SW-C-9602-00
KAIG3-RFI-SW-C-9601 00 KAIG3-RFI-SW-C-9601-00
KAIG3-RFI-SW-C-9590 00 KAIG3-RFI-SW-C-9590-00
KAIG3-RFI-SW-C-9589 00 KAIG3-RFI-SW-C-9589-00
KAIG3-RFI-CO-SU-03341 00 KAIG3-RFI-CO-SU-03341-00
KAIG3-RFI-SW-C-9577 00 KAIG3-RFI-SW-C-9577-00
KAIG3-RFI-LM-S-10497 00 KAIG3-RFI-LM-S-10497-00
KAIG3-RFI-SW-C-9576 00 KAIG3-RFI-SW-C-9576-00
KAIG3-RFI-CO-S-10288 00 KAIG3-RFI-CO-S-10288-00
KAIG3-RFI-CO-S-10257 00 KAIG3-RFI-CO-S-10257-00
KAIG3-RFI-CO-S-9790 00 KAIG3-RFI-CO-S-9790-00
KAIG3-RFI-PA-C-9634 00 KAIG3-RFI-PA-C-9634-00
KAIG3-RFI-PA-C-9609 00 KAIG3-RFI-PA-C-9609-00
KAIG3-RFI-SW-C-9588 00 KAIG3-RFI-SW-C-9588-00
KAIG3-RFI-SW-C-9587 00 KAIG3-RFI-SW-C-9587-00
KAIG3-RFI-SW-C-9586 00 KAIG3-RFI-SW-C-9586-00
KAIG3-RFI-SW-C-9585 00 KAIG3-RFI-SW-C-9585-00
KAIG3-RFI-SW-C-9584 00 KAIG3-RFI-SW-C-9584-00
KAIG3-RFI-SW-C-9583 00 KAIG3-RFI-SW-C-9583-00
KAIG3-RFI-SW-C-9582 00 KAIG3-RFI-SW-C-9582-00
KAIG3-RFI-SW-C-9581 00 KAIG3-RFI-SW-C-9581-00
KAIG3-RFI-SW-C-9580 00 KAIG3-RFI-SW-C-9580-00
KAIG3-RFI-SW-C-9579 00 KAIG3-RFI-SW-C-9579-00
KAIG3-RFI-SW-C-9578 00 KAIG3-RFI-SW-C-9578-00
KAIG3-RFI-SW-C-9575 00 KAIG3-RFI-SW-C-9575-00
KAIG3-RFI-SW-C-9574 00 KAIG3-RFI-SW-C-9574-00
KAIG3-RFI-SW-C-9556 00 KAIG3-RFI-SW-C-9556-00
KAIG3-RFI-SW-C-9555 00 KAIG3-RFI-SW-C-9555-00
KAIG3-RFI-SW-C-9554 00 KAIG3-RFI-SW-C-9554-00
KAIG3-RFI-SW-C-9553 00 KAIG3-RFI-SW-C-9553-00
KAIG3-RFI-SW-C-9552 00 KAIG3-RFI-SW-C-9552-00
KAIG3-RFI-SW-C-9551 00 KAIG3-RFI-SW-C-9551-00
KAIG3-RFI-SW-LS-1817 00 KAIG3-RFI-SW-LS-1817-00
KAIG3-RFI-SW-LS-1815 00 KAIG3-RFI-SW-LS-1815-00
KAIG3-RFI-SW-C-9550 00 KAIG3-RFI-SW-C-9550-00
KAIG3-RFI-SW-LS-1810 00 KAIG3-RFI-SW-LS-1810-00
KAIG3-RFI-SW-C-9549 00 KAIG3-RFI-SW-C-9549-00
KAIG3-RFI-SW-LS-1809 00 KAIG3-RFI-SW-LS-1809-00
KAIG3-RFI-SW-C-9546 00 KAIG3-RFI-SW-C-9546-00
KAIG3-RFI-SW-C-9545 00 KAIG3-RFI-SW-C-9545-00
KAIG3-RFI-SW-C-9542 00 KAIG3-RFI-SW-C-9542-00
KAIG3-RFI-SW-C-9541 00 KAIG3-RFI-SW-C-9541-00
KAIG3-RFI-SW-C-9540 00 KAIG3-RFI-SW-C-9540-00
KAIG3-RFI-SW-C-9539 00 KAIG3-RFI-SW-C-9539-00
KAIG3-RFI-SW-C-9538 00 KAIG3-RFI-SW-C-9538-00
KAIG3-RFI-SW-C-9548 00 KAIG3-RFI-SW-C-9548-00
KAIG3-RFI-SW-C-9547 00 KAIG3-RFI-SW-C-9547-00
KAIG3-RFI-SW-C-8120 00 KAIG3-RFI-SW-C-8120-00
KAIG3-RFI-PA-C-9544 00 KAIG3-RFI-PA-C-9544-00
KAIG3-RFI-SW-C-9537 00 KAIG3-RFI-SW-C-9537-00
KAIG3-RFI-SW-C-9535 00 KAIG3-RFI-SW-C-9535-00
KAIG3-RFI-SW-C-9534 00 KAIG3-RFI-SW-C-9534-00
KAIG3-RFI-SW-C-9533 00 KAIG3-RFI-SW-C-9533-00
KAIG3-RFI-SW-C-9532 00 KAIG3-RFI-SW-C-9532-00
KAIG3-RFI-SW-C-9531 00 KAIG3-RFI-SW-C-9531-00
KAIG3-RFI-SW-C-9356 01 KAIG3-RFI-SW-C-9356-01
KAIG3-RFI-SW-C-9530 00 KAIG3-RFI-SW-C-9530-00
KAIG3-RFI-SW-C-9529 00 KAIG3-RFI-SW-C-9529-00
KAIG3-RFI-SW-C-9528 00 KAIG3-RFI-SW-C-9528-00
KAIG3-RFI-SW-C-9527 00 KAIG3-RFI-SW-C-9527-00
KAIG3-RFI-SW-C-9518 00 KAIG3-RFI-SW-C-9518-00
KAIG3-RFI-SW-C-9517 00 KAIG3-RFI-SW-C-9517-00
KAIG3-RFI-SW-C-9459 00 KAIG3-RFI-SW-C-9459-00
KAIG3-RFI-SW-C-9437 00 KAIG3-RFI-SW-C-9437-00
KAIG3-RFI-PA-C-9543 00 KAIG3-RFI-PA-C-9543-00
KAIG3-RFI-SW-C-9526 00 KAIG3-RFI-SW-C-9526-00
KAIG3-RFI-SW-C-9525 00 KAIG3-RFI-SW-C-9525-00
KAIG3-RFI-SW-C-9524 00 KAIG3-RFI-SW-C-9524-00
KAIG3-RFI-SW-C-9523 00 KAIG3-RFI-SW-C-9523-00
KAIG3-RFI-SW-C-9520 00 KAIG3-RFI-SW-C-9520-00
KAIG3-RFI-WG-C-9632 00 KAIG3-RFI-WG-C-9632-00
KAIG3-RFI-WG-C-9623 00 KAIG3-RFI-WG-C-9623-00
KAIG3-RFI-WG-C-9622 00 KAIG3-RFI-WG-C-9622-00
KAIG3-RFI-WG-C-9621 00 KAIG3-RFI-WG-C-9621-00
KAIG3-RFI-SW-C-9519 00 KAIG3-RFI-SW-C-9519-00
KAIG3-RFI-PG-S-10742 00 KAIG3-RFI-PG-S-10742-00
KAIG3-RFI-SW-C-9515 00 KAIG3-RFI-SW-C-9515-00
KAIG3-RFI-SW-C-9509 00 KAIG3-RFI-SW-C-9509-00
KAIG3-RFI-PG-S-10741 00 KAIG3-RFI-PG-S-10741-00
KAIG3-RFI-SW-C-9477 00 KAIG3-RFI-SW-C-9477-00
KAIG3-RFI-WG-SU-3460 00 KAIG3-RFI-WG-SU-3460-00
KAIG3-RFI-PG-SU-3457 00 KAIG3-RFI-PG-SU-3457-00
KAIG3-RFI-PG-SU-3428 00 KAIG3-RFI-PG-SU-3428-00
KAIG3-RFI-DG-LS-1819 00 KAIG3-RFI-DG-LS-1819-00
KAIG3-RFI-TG-S-10572 01 KAIG3-RFI-TG-S-10572-01
KAIG3-RFI-PG-C-9597 00 KAIG3-RFI-PG-C-9597-00
KAIG3-RFI-PG-C-9596 00 KAIG3-RFI-PG-C-9596-00
KAIG3-RFI-PG-C-9595 00 KAIG3-RFI-PG-C-9595-00
KAIG3-RFI-PG-C-9594 00 KAIG3-RFI-PG-C-9594-00
KAIG3-RFI-PG-C-9593 00 KAIG3-RFI-PG-C-9593-00
KAIG3-RFI-WG-C-9591 00 KAIG3-RFI-WG-C-9591-00
KAIG3-RFI-WG-C-9494 01 KAIG3-RFI-WG-C-9494-01
KAIG3-RFI-PG-C-9558 00 KAIG3-RFI-PG-C-9558-00
KAIG3-RFI-PG-C-9557 00 KAIG3-RFI-PG-C-9557-00
KAIG3-RFI-WG-C-9628 00 KAIG3-RFI-WG-C-9628-00
KAIG3-RFI-TG-E-0706 00 KAIG3-RFI-TG-E-0706-00
KAIG3-RFI-TG-E-0705 00 KAIG3-RFI-TG-E-0705-00
KAIG3-RFI-SW-M-0412 00 KAIG3-RFI-SW-M-0412-00
KAIG3-RFI-SW-M-0411 00 KAIG3-RFI-SW-M-0411-00
KAIG3-RFI-CO-S-10727 00 KAIG3-RFI-CO-S-10727-00
KAIG3-RFI-CO-S-10726 00 KAIG3-RFI-CO-S-10726-00
KAIG3-RFI-SM-SU-03402 01 KAIG3-RFI-SM-SU-03402-01
KAIG3-RFI-CO-SU-03453 00 KAIG3-RFI-CO-SU-03453-00
KAIG3-RFI-NA-SU-03452 00 KAIG3-RFI-NA-SU-03452-00
KAIG3-RFI-CO-SU-03450 00 KAIG3-RFI-CO-SU-03450-00
KAIG3-RFI-CO-SU-03451 00 KAIG3-RFI-CO-SU-03451-00
KAIG3-RFI-MC-S-10541 01 KAIG3-RFI-MC-S-10541-01
KAIG3-RFI-CO-S-10517 01 KAIG3-RFI-CO-S-10517-01
KAIG3-RFI-CO-S-10518 01 KAIG3-RFI-CO-S-10518-01
KAIG3-RFI-CO-S-10532 01 KAIG3-RFI-CO-S-10532-01
KAIG3-RFI-SM-S-10577 01 KAIG3-RFI-SM-S-10577-01
KAIG3-RFI-SM-S-10578 01 KAIG3-RFI-SM-S-10578-01
KAIG3-RFI-CO-S-10730 00 KAIG3-RFI-CO-S-10730-00
KAIG3-RFI-LM-S-10729 00 KAIG3-RFI-LM-S-10729-00
KAIG3-RFI-CO-S-10728 00 KAIG3-RFI-CO-S-10728-00
KAIG3-RFI-NA-S-10725 00 KAIG3-RFI-NA-S-10725-00
KAIG3-RFI-CO-S-10717 00 KAIG3-RFI-CO-S-10717-00
KAIG3-RFI-CO-S-10718 00 KAIG3-RFI-CO-S-10718-00
KAIG3-RFI-CO-S-10719 00 KAIG3-RFI-CO-S-10719-00
KAIG3-RFI-CO-S-10720 00 KAIG3-RFI-CO-S-10720-00
KAIG3-RFI-CO-S-10721 00 KAIG3-RFI-CO-S-10721-00
KAIG3-RFI-CO-S-10722 00 KAIG3-RFI-CO-S-10722-00
KAIG3-RFI-NA-S-10724 00 KAIG3-RFI-NA-S-10724-00
KAIG3-RFI-CO-S-10655 00 KAIG3-RFI-CO-S-10655-00
KAIG3-RFI-CO-S-10605 01 KAIG3-RFI-CO-S-10605-01
KAIG3-RFI-SM-S-10502 01 KAIG3-RFI-SM-S-10502-01
KAIG3-RFI-CO-S-10705 00 KAIG3-RFI-CO-S-10705-00
KAIG3-RFI-CO-S-10714 00 KAIG3-RFI-CO-S-10714-00
KAIG3-RFI-CO-S-10715 00 KAIG3-RFI-CO-S-10715-00
KAIG3-RFI-CO-S-10716 00 KAIG3-RFI-CO-S-10716-00
KAIG3-RFI-MC-S-10711 00 KAIG3-RFI-MC-S-10711-00
KAIG3-RFI-MC-S-10712 00 KAIG3-RFI-MC-S-10712-00
KAIG3-RFI-MC-S-10713 00 KAIG3-RFI-MC-S-10713-00
KAIG3-RFI-LM-E-0701 00 KAIG3-RFI-LM-E-0701-00
KAIG3-RFI-PG-E-0670 00 KAIG3-RFI-PG-E-0670-00
KAIG3-RFI-PG-E-0663 02 KAIG3-RFI-PG-E-0663-02
KAIG3-RFI-SW-E-0696 00 KAIG3-RFI-SW-E-0696-00
KAIG3-RFI-PG-E-0690 00 KAIG3-RFI-PG-E-0690-00
KAIG3-RFI-PG-E-0685 00 KAIG3-RFI-PG-E-0685-00
KAIG3-RFI-TT-E-0694 00 KAIG3-RFI-TT-E-0694-00
KAIG3-RFI-LM-LC-0948 00 KAIG3-RFI-LM-LC-0948-00
KAIG3-RFI-TT-LC-0943 00 KAIG3-RFI-TT-LC-0943-00
KAIG3-RFI-TT-LC-0942 00 KAIG3-RFI-TT-LC-0942-00
KAIG3-RFI-WG-C-9600 00 KAIG3-RFI-WG-C-9600-00
KAIG3-RFI-WG-C-9599 00 KAIG3-RFI-WG-C-9599-00
KAIG3-RFI-SW-LS-1818 00 KAIG3-RFI-SW-LS-1818-00
KAIG3-RFI-PG-C-9598 00 KAIG3-RFI-PG-C-9598-00
KAIG3-RFI-CC-P-0410 00 KAIG3-RFI-CC-P-0410-00
KAIG3-RFI-WG-P-0408 00 KAIG3-RFI-WG-P-0408-00
KAIG3-RFI-SW-M-0406 00 KAIG3-RFI-SW-M-0406-00
KAIG3-RFI-SW-P-0404 00 KAIG3-RFI-SW-P-0404-00
KAIG3-RFI-SW-E-0692 00 KAIG3-RFI-SW-E-0692-00
KAIG3-RFI-SW-E-0709 00 KAIG3-RFI-SW-E-0709-00
KAIG3-RFI-SW-E-0708 00 KAIG3-RFI-SW-E-0708-00
KAIG3-RFI-SW-E-0707 00 KAIG3-RFI-SW-E-0707-00
KAIG3-RFI-SW-E-0704 00 KAIG3-RFI-SW-E-0704-00
KAIG3-RFI-SW-E-0703 00 KAIG3-RFI-SW-E-0703-00
KAIG3-RFI-SW-E-0702 00 KAIG3-RFI-SW-E-0702-00
KAIG3-RFI-TG-S-10707 00 KAIG3-RFI-TG-S-10707-00
KAIG3-RFI-DG-LS-1816 00 KAIG3-RFI-DG-LS-1816-00
KAIG3-RFI-CO-A-1352 00 KAIG3-RFI-CO-A-1352-00
KAIG3-RFI-CO-A-1351 00 KAIG3-RFI-CO-A-1351-00
KAIG3-RFI-PC-E-0697 00 KAIG3-RFI-PC-E-0697-00
KAIG3-RFI-TG-C-9273 00 KAIG3-RFI-TG-C-9273-00
KAIG3-RFI-TG-C-9272 00 KAIG3-RFI-TG-C-9272-00
KAIG3-RFI-WG-C-9560 00 KAIG3-RFI-WG-C-9560-00
KAIG3-RFI-WG-C-9559 00 KAIG3-RFI-WG-C-9559-00
KAIG3-RFI-DG-C-9567 00 KAIG3-RFI-DG-C-9567-00
KAIG3-RFI-WG-C-9566 00 KAIG3-RFI-WG-C-9566-00
KAIG3-RFI-WG-C-9565 00 KAIG3-RFI-WG-C-9565-00
KAIG3-RFI-WG-C-9564 00 KAIG3-RFI-WG-C-9564-00
KAIG3-RFI-WG-C-9563 00 KAIG3-RFI-WG-C-9563-00
KAIG3-RFI-PG-C-9562 00 KAIG3-RFI-PG-C-9562-00
KAIG3-RFI-PG-C-9561 00 KAIG3-RFI-PG-C-9561-00
KAIG3-RFI-WG-C-9536 00 KAIG3-RFI-WG-C-9536-00
KAIG3-RFI-MC-C-09570 00 KAIG3-RFI-MC-C-09570-00
KAIG3-RFI-CO-C-09571 00 KAIG3-RFI-CO-C-09571-00
KAIG3-RFI-CO-C-09569 00 KAIG3-RFI-CO-C-09569-00
KAIG3-RFI-MC-C-09568 00 KAIG3-RFI-MC-C-09568-00
KAIG3-RFI-LM-SU-03444 00 KAIG3-RFI-LM-SU-03444-00
KAIG3-RFI-CO-SU-03447 00 KAIG3-RFI-CO-SU-03447-00
KAIG3-RFI-MC-SU-03446 00 KAIG3-RFI-MC-SU-03446-00
KAIG3-RFI-MC-SU-03449 00 KAIG3-RFI-MC-SU-03449-00
KAIG3-RFI-CO-SU-03445 00 KAIG3-RFI-CO-SU-03445-00
KAIG3-RFI-CO-SU-03442 00 KAIG3-RFI-CO-SU-03442-00
KAIG3-RFI-MC-S-10703 00 KAIG3-RFI-MC-S-10703-00
KAIG3-RFI-MC-S-10702 00 KAIG3-RFI-MC-S-10702-00
KAIG3-RFI-LM-S-10698 00 KAIG3-RFI-LM-S-10698-00
KAIG3-RFI-MC-S-10692 00 KAIG3-RFI-MC-S-10692-00
KAIG3-RFI-MC-S-10691 00 KAIG3-RFI-MC-S-10691-00
KAIG3-RFI-CO-S-10701 00 KAIG3-RFI-CO-S-10701-00
KAIG3-RFI-CO-S-10471 00 KAIG3-RFI-CO-S-10471-00
KAIG3-RFI-CO-S-10700 00 KAIG3-RFI-CO-S-10700-00
KAIG3-RFI-CO-S-10704 00 KAIG3-RFI-CO-S-10704-00
KAIG3-RFI-CO-S-10679 00 KAIG3-RFI-CO-S-10679-00
KAIG3-RFI-MC-S-10710 00 KAIG3-RFI-MC-S-10710-00
KAIG3-RFI-MC-S-10709 00 KAIG3-RFI-MC-S-10709-00
KAIG3-RFI-MC-S-10708 00 KAIG3-RFI-MC-S-10708-00
KAIG3-RFI-CO-S-10649 00 KAIG3-RFI-CO-S-10649-00
KAIG3-RFI-CO-S-10706 00 KAIG3-RFI-CO-S-10706-00
KAIG3-RFI-CO-S-10652 00 KAIG3-RFI-CO-S-10652-00
KAIG3-RFI-LM-S-10695 00 KAIG3-RFI-LM-S-10695-00
KAIG3-RFI-NA-S-10670 00 KAIG3-RFI-NA-S-10670-00
KAIG3-RFI-CO-S-10690 00 KAIG3-RFI-CO-S-10690-00
KAIG3-RFI-CO-S-10693 00 KAIG3-RFI-CO-S-10693-00
KAIG3-RFI-CO-S-10694 00 KAIG3-RFI-CO-S-10694-00
KAIG3-RFI-CO-SU-03438 00 KAIG3-RFI-CO-SU-03438-00
KAIG3-RFI-EC-SU-03441 00 KAIG3-RFI-EC-SU-03441-00
KAIG3-RFI-CF-SU-03440 00 KAIG3-RFI-CF-SU-03440-00
KAIG3-RFI-CO-SU-03439 00 KAIG3-RFI-CO-SU-03439-00
KAIG3-RFI-CO-C-09521 00 KAIG3-RFI-CO-C-09521-00
KAIG3-RFI-MC-C-09522 00 KAIG3-RFI-MC-C-09522-00
KAIG3-RFI-CO-S-10682 00 KAIG3-RFI-CO-S-10682-00
KAIG3-RFI-CO-S-10683 00 KAIG3-RFI-CO-S-10683-00
KAIG3-RFI-CO-S-10684 00 KAIG3-RFI-CO-S-10684-00
KAIG3-RFI-EC-S-10688 00 KAIG3-RFI-EC-S-10688-00
KAIG3-RFI-CO-S-10687 00 KAIG3-RFI-CO-S-10687-00
KAIG3-RFI-CF-S-10685 00 KAIG3-RFI-CF-S-10685-00
KAIG3-RFI-CF-S-10686 00 KAIG3-RFI-CF-S-10686-00
KAIG3-RFI-CO-S-10689 00 KAIG3-RFI-CO-S-10689-00
KAIG3-RFI-CO-S-10567 01 KAIG3-RFI-CO-S-10567-01
KAIG3-RFI-CO-S-10678 00 KAIG3-RFI-CO-S-10678-00
KAIG3-RFI-CO-S-10662 00 KAIG3-RFI-CO-S-10662-00
KAIG3-RFI-CO-S-10663 00 KAIG3-RFI-CO-S-10663-00
KAIG3-RFI-CO-S-10664 00 KAIG3-RFI-CO-S-10664-00
KAIG3-RFI-CO-S-10680 00 KAIG3-RFI-CO-S-10680-00
KAIG3-RFI-MC-C-09497 00 KAIG3-RFI-MC-C-09497-00
KAIG3-RFI-EC-C-09500 00 KAIG3-RFI-EC-C-09500-00
KAIG3-RFI-EC-C-09499 00 KAIG3-RFI-EC-C-09499-00
KAIG3-RFI-SW-C-9441 00 KAIG3-RFI-SW-C-9441-00
KAIG3-RFI-SW-P-0405 00 KAIG3-RFI-SW-P-0405-00
KAIG3-RFI-SW-M-0403 00 KAIG3-RFI-SW-M-0403-00
KAIG3-RFI-TG-LC-0947 00 KAIG3-RFI-TG-LC-0947-00
KAIG3-RFI-TG-LC-0946 00 KAIG3-RFI-TG-LC-0946-00
KAIG3-RFI-GC-LC-0945 00 KAIG3-RFI-GC-LC-0945-00
KAIG3-RFI-SW-C-9573 00 KAIG3-RFI-SW-C-9573-00
KAIG3-RFI-SW-C-9572 00 KAIG3-RFI-SW-C-9572-00
KAIG3-RFI-GC-LC-0944 00 KAIG3-RFI-GC-LC-0944-00
KAIG3-RFI-PC-LC-0941 00 KAIG3-RFI-PC-LC-0941-00
KAIG3-RFI-SW-E-0699 00 KAIG3-RFI-SW-E-0699-00
KAIG3-RFI-SW-E-0693 00 KAIG3-RFI-SW-E-0693-00
KAIG3-RFI-CO-SU-03432 00 KAIG3-RFI-CO-SU-03432-00
KAIG3-RFI-EC-SU-03437 00 KAIG3-RFI-EC-SU-03437-00
KAIG3-RFI-CO-SU-03434 00 KAIG3-RFI-CO-SU-03434-00
KAIG3-RFI-CO-SU-03433 00 KAIG3-RFI-CO-SU-03433-00
KAIG3-RFI-EC-S-10671 00 KAIG3-RFI-EC-S-10671-00
KAIG3-RFI-EC-SU-03436 00 KAIG3-RFI-EC-SU-03436-00
KAIG3-RFI-NA-SU-03435 00 KAIG3-RFI-NA-SU-03435-00
KAIG3-RFI-CO-S-10646 00 KAIG3-RFI-CO-S-10646-00
KAIG3-RFI-CO-S-10645 00 KAIG3-RFI-CO-S-10645-00
KAIG3-RFI-CO-S-10644 00 KAIG3-RFI-CO-S-10644-00
KAIG3-RFI-TT-LC-0880 02 KAIG3-RFI-TT-LC-0880-02
KAIG3-RFI-MC-S-10656 00 KAIG3-RFI-MC-S-10656-00
KAIG3-RFI-MC-S-10610 00 KAIG3-RFI-MC-S-10610-00
KAIG3-RFI-CO-S-10592 00 KAIG3-RFI-CO-S-10592-00
KAIG3-RFI-CO-S-10654 00 KAIG3-RFI-CO-S-10654-00
KAIG3-RFI-NA-S-10669 00 KAIG3-RFI-NA-S-10669-00
KAIG3-RFI-CO-S-10667 00 KAIG3-RFI-CO-S-10667-00
KAIG3-RFI-CO-S-10666 00 KAIG3-RFI-CO-S-10666-00
KAIG3-RFI-EC-S-10673 00 KAIG3-RFI-EC-S-10673-00
KAIG3-RFI-TT-LC-0881 02 KAIG3-RFI-TT-LC-0881-02
KAIG3-RFI-EC-S-10672 00 KAIG3-RFI-EC-S-10672-00
KAIG3-RFI-PC-S-10674 00 KAIG3-RFI-PC-S-10674-00
KAIG3-RFI-PC-S-10675 00 KAIG3-RFI-PC-S-10675-00
KAIG3-RFI-TT-LC-0879 02 KAIG3-RFI-TT-LC-0879-02
KAIG3-RFI-PC-LC-0929 00 KAIG3-RFI-PC-LC-0929-00
KAIG3-RFI-WG-SU-3431 00 KAIG3-RFI-WG-SU-3431-00
KAIG3-RFI-NA-LC-0940 00 KAIG3-RFI-NA-LC-0940-00
KAIG3-RFI-NA-LC-0936 00 KAIG3-RFI-NA-LC-0936-00
KAIG3-RFI-NA-LC-0935 00 KAIG3-RFI-NA-LC-0935-00
KAIG3-RFI-SW-LC-0934 00 KAIG3-RFI-SW-LC-0934-00
KAIG3-RFI-SW-LC-0933 00 KAIG3-RFI-SW-LC-0933-00
KAIG3-RFI-SW-M-0402 00 KAIG3-RFI-SW-M-0402-00
KAIG3-RFI-SW-LS-1808 00 KAIG3-RFI-SW-LS-1808-00
KAIG3-RFI-SW-LS-1807 00 KAIG3-RFI-SW-LS-1807-00
KAIG3-RFI-SW-LS-1806 00 KAIG3-RFI-SW-LS-1806-00
KAIG3-RFI-SW-C-9514 00 KAIG3-RFI-SW-C-9514-00
KAIG3-RFI-SW-C-9513 00 KAIG3-RFI-SW-C-9513-00
KAIG3-RFI-SW-C-9512 00 KAIG3-RFI-SW-C-9512-00
KAIG3-RFI-SW-C-9511 00 KAIG3-RFI-SW-C-9511-00
KAIG3-RFI-SW-C-9510 00 KAIG3-RFI-SW-C-9510-00
KAIG3-RFI-SW-C-9508 00 KAIG3-RFI-SW-C-9508-00
KAIG3-RFI-SW-C-9507 00 KAIG3-RFI-SW-C-9507-00
KAIG3-RFI-SW-C-9506 00 KAIG3-RFI-SW-C-9506-00
KAIG3-RFI-SW-C-9490 00 KAIG3-RFI-SW-C-9490-00
KAIG3-RFI-SW-C-9489 00 KAIG3-RFI-SW-C-9489-00
KAIG3-RFI-SW-C-9488 00 KAIG3-RFI-SW-C-9488-00
KAIG3-RFI-SW-C-9487 00 KAIG3-RFI-SW-C-9487-00
KAIG3-RFI-SW-C-9486 00 KAIG3-RFI-SW-C-9486-00
KAIG3-RFI-SW-C-9484 00 KAIG3-RFI-SW-C-9484-00
KAIG3-RFI-SW-C-9483 00 KAIG3-RFI-SW-C-9483-00
KAIG3-RFI-SW-C-9482 00 KAIG3-RFI-SW-C-9482-00
KAIG3-RFI-SW-C-9481 00 KAIG3-RFI-SW-C-9481-00
KAIG3-RFI-SW-C-9480 00 KAIG3-RFI-SW-C-9480-00
KAIG3-RFI-SW-C-9479 00 KAIG3-RFI-SW-C-9479-00
KAIG3-RFI-SW-C-9382 01 KAIG3-RFI-SW-C-9382-01
KAIG3-RFI-SW-C-9478 00 KAIG3-RFI-SW-C-9478-00
KAIG3-RFI-SW-C-9476 00 KAIG3-RFI-SW-C-9476-00
KAIG3-RFI-SW-C-9475 00 KAIG3-RFI-SW-C-9475-00
KAIG3-RFI-SW-C-9470 00 KAIG3-RFI-SW-C-9470-00
KAIG3-RFI-SW-C-9469 00 KAIG3-RFI-SW-C-9469-00
KAIG3-RFI-SW-C-9468 00 KAIG3-RFI-SW-C-9468-00
KAIG3-RFI-SW-C-9467 00 KAIG3-RFI-SW-C-9467-00
KAIG3-RFI-SW-C-9466 00 KAIG3-RFI-SW-C-9466-00
KAIG3-RFI-SW-C-9465 00 KAIG3-RFI-SW-C-9465-00
KAIG3-RFI-SW-LS-1805 00 KAIG3-RFI-SW-LS-1805-00
KAIG3-RFI-SW-LS-1804 00 KAIG3-RFI-SW-LS-1804-00
KAIG3-RFI-SW-C-9464 00 KAIG3-RFI-SW-C-9464-00
KAIG3-RFI-SW-C-9463 00 KAIG3-RFI-SW-C-9463-00
KAIG3-RFI-SW-C-9462 00 KAIG3-RFI-SW-C-9462-00
KAIG3-RFI-SW-C-9461 00 KAIG3-RFI-SW-C-9461-00
KAIG3-RFI-SW-C-9460 00 KAIG3-RFI-SW-C-9460-00
KAIG3-RFI-SW-C-9458 00 KAIG3-RFI-SW-C-9458-00
KAIG3-RFI-SW-C-9457 00 KAIG3-RFI-SW-C-9457-00
KAIG3-RFI-SW-C-9456 00 KAIG3-RFI-SW-C-9456-00
KAIG3-RFI-SW-C-9455 00 KAIG3-RFI-SW-C-9455-00
KAIG3-RFI-SW-C-9454 00 KAIG3-RFI-SW-C-9454-00
KAIG3-RFI-SW-C-9445 00 KAIG3-RFI-SW-C-9445-00
KAIG3-RFI-SW-C-9444 00 KAIG3-RFI-SW-C-9444-00
KAIG3-RFI-SW-C-9440 00 KAIG3-RFI-SW-C-9440-00
KAIG3-RFI-SW-C-9438 00 KAIG3-RFI-SW-C-9438-00
KAIG3-RFI-SW-C-9435 00 KAIG3-RFI-SW-C-9435-00
KAIG3-RFI-SW-C-9434 00 KAIG3-RFI-SW-C-9434-00
KAIG3-RFI-SW-C-9433 00 KAIG3-RFI-SW-C-9433-00
KAIG3-RFI-SW-C-9443 00 KAIG3-RFI-SW-C-9443-00
KAIG3-RFI-SW-C-9442 00 KAIG3-RFI-SW-C-9442-00
KAIG3-RFI-SW-C-9439 00 KAIG3-RFI-SW-C-9439-00
KAIG3-RFI-SW-C-9436 00 KAIG3-RFI-SW-C-9436-00
KAIG3-RFI-SW-C-9432 00 KAIG3-RFI-SW-C-9432-00
KAIG3-RFI-SW-C-9431 00 KAIG3-RFI-SW-C-9431-00
KAIG3-RFI-SW-C-9430 00 KAIG3-RFI-SW-C-9430-00
KAIG3-RFI-SW-C-9429 00 KAIG3-RFI-SW-C-9429-00
KAIG3-RFI-SW-C-9428 00 KAIG3-RFI-SW-C-9428-00
KAIG3-RFI-SW-C-9427 00 KAIG3-RFI-SW-C-9427-00
KAIG3-RFI-SW-C-9426 00 KAIG3-RFI-SW-C-9426-00
KAIG3-RFI-SW-C-9425 00 KAIG3-RFI-SW-C-9425-00
KAIG3-RFI-SW-C-9424 00 KAIG3-RFI-SW-C-9424-00
KAIG3-RFI-CO-S-10676 00 KAIG3-RFI-CO-S-10676-00
KAIG3-RFI-CO-S-10630 00 KAIG3-RFI-CO-S-10630-00
KAIG3-RFI-SM-S-10503 00 KAIG3-RFI-SM-S-10503-00
KAIG3-RFI-NA-S-10580 00 KAIG3-RFI-NA-S-10580-00
KAIG3-RFI-CO-SU-03430 00 KAIG3-RFI-CO-SU-03430-00
KAIG3-RFI-CO-SU-03429 00 KAIG3-RFI-CO-SU-03429-00
KAIG3-RFI-WG-C-9491 00 KAIG3-RFI-WG-C-9491-00
KAIG3-RFI-DG-C-9505 00 KAIG3-RFI-DG-C-9505-00
KAIG3-RFI-WG-C-9504 00 KAIG3-RFI-WG-C-9504-00
KAIG3-RFI-PG-C-9503 00 KAIG3-RFI-PG-C-9503-00
KAIG3-RFI-MB-S-10613 00 KAIG3-RFI-MB-S-10613-00
KAIG3-RFI-PG-S-10677 00 KAIG3-RFI-PG-S-10677-00
KAIG3-RFI-PG-S-10653 00 KAIG3-RFI-PG-S-10653-00
KAIG3-RFI-PG-LS-1814 00 KAIG3-RFI-PG-LS-1814-00
KAIG3-RFI-PG-LS-1813 00 KAIG3-RFI-PG-LS-1813-00
KAIG3-RFI-DG-C-9496 00 KAIG3-RFI-DG-C-9496-00
KAIG3-RFI-PG-C-9495 00 KAIG3-RFI-PG-C-9495-00
KAIG3-RFI-WG-C-9494 00 KAIG3-RFI-WG-C-9494-00
KAIG3-RFI-WG-C-9493 00 KAIG3-RFI-WG-C-9493-00
KAIG3-RFI-WG-C-9492 00 KAIG3-RFI-WG-C-9492-00
KAIG3-RFI-FC-A-1350 00 KAIG3-RFI-FC-A-1350-00
KAIG3-RFI-WG-LS-1803 00 KAIG3-RFI-WG-LS-1803-00
KAIG3-RFI-SW-C-9397 00 KAIG3-RFI-SW-C-9397-00
KAIG3-RFI-SW-C-9396 00 KAIG3-RFI-SW-C-9396-00
KAIG3-RFI-SW-C-9395 00 KAIG3-RFI-SW-C-9395-00
KAIG3-RFI-SW-C-9394 00 KAIG3-RFI-SW-C-9394-00
KAIG3-RFI-SW-C-9393 00 KAIG3-RFI-SW-C-9393-00
KAIG3-RFI-SW-C-9385 00 KAIG3-RFI-SW-C-9385-00
KAIG3-RFI-SW-C-9384 00 KAIG3-RFI-SW-C-9384-00
KAIG3-RFI-SW-C-9383 00 KAIG3-RFI-SW-C-9383-00
KAIG3-RFI-SW-C-9382 00 KAIG3-RFI-SW-C-9382-00
KAIG3-RFI-PG-C-9498 00 KAIG3-RFI-PG-C-9498-00
KAIG3-RFI-WG-SU-03418 00 KAIG3-RFI-WG-SU-03418-00
KAIG3-RFI-SW-C-9502 00 KAIG3-RFI-SW-C-9502-00
KAIG3-RFI-WG-C-9451 00 KAIG3-RFI-WG-C-9451-00
KAIG3-RFI-SW-C-9501 00 KAIG3-RFI-SW-C-9501-00
KAIG3-RFI-WG-C-9450 00 KAIG3-RFI-WG-C-9450-00
KAIG3-RFI-WG-C-9449 00 KAIG3-RFI-WG-C-9449-00
KAIG3-RFI-WG-C-9448 00 KAIG3-RFI-WG-C-9448-00
KAIG3-RFI-WG-C-9446 00 KAIG3-RFI-WG-C-9446-00
KAIG3-RFI-PG-C-9473 00 KAIG3-RFI-PG-C-9473-00
KAIG3-RFI-PG-C-9472 00 KAIG3-RFI-PG-C-9472-00
KAIG3-RFI-WG-P-0395 01 KAIG3-RFI-WG-P-0395-01
KAIG3-RFI-PG-C-9471 00 KAIG3-RFI-PG-C-9471-00
KAIG3-RFI-TB-S-10638 00 KAIG3-RFI-TB-S-10638-00
KAIG3-RFI-SW-M-0401 00 KAIG3-RFI-SW-M-0401-00
KAIG3-RFI-PG-LC-0926 00 KAIG3-RFI-PG-LC-0926-00
KAIG3-RFI-PG-LC-0922 00 KAIG3-RFI-PG-LC-0922-00
KAIG3-RFI-TB-SU-3424 00 KAIG3-RFI-TB-SU-3424-00
KAIG3-RFI-CC-S-10657 00 KAIG3-RFI-CC-S-10657-00
KAIG3-RFI-CO-S-10647 00 KAIG3-RFI-CO-S-10647-00
KAIG3-RFI-CO-S-10643 00 KAIG3-RFI-CO-S-10643-00
KAIG3-RFI-CO-S-10651 00 KAIG3-RFI-CO-S-10651-00
KAIG3-RFI-CO-S-10650 00 KAIG3-RFI-CO-S-10650-00
KAIG3-RFI-CO-S-9910 01 KAIG3-RFI-CO-S-9910-01
KAIG3-RFI-CG-C-09453 00 KAIG3-RFI-CG-C-09453-00
KAIG3-RFI-MC-C-09474 00 KAIG3-RFI-MC-C-09474-00
KAIG3-RFI-CO-SU-03427 00 KAIG3-RFI-CO-SU-03427-00
KAIG3-RFI-EC-SU-03426 00 KAIG3-RFI-EC-SU-03426-00
KAIG3-RFI-MC-SU-03423 00 KAIG3-RFI-MC-SU-03423-00
KAIG3-RFI-EC-SU-03425 00 KAIG3-RFI-EC-SU-03425-00
KAIG3-RFI-CO-SU-03422 00 KAIG3-RFI-CO-SU-03422-00
KAIG3-RFI-CF-SU-03421 00 KAIG3-RFI-CF-SU-03421-00
KAIG3-RFI-CO-S-10648 00 KAIG3-RFI-CO-S-10648-00
KAIG3-RFI-CF-S-10627 00 KAIG3-RFI-CF-S-10627-00
KAIG3-RFI-CO-S-10642 00 KAIG3-RFI-CO-S-10642-00
KAIG3-RFI-EC-S-10636 00 KAIG3-RFI-EC-S-10636-00
KAIG3-RFI-EC-S-10641 00 KAIG3-RFI-EC-S-10641-00
KAIG3-RFI-CO-S-10639 00 KAIG3-RFI-CO-S-10639-00
KAIG3-RFI-CO-S-10640 00 KAIG3-RFI-CO-S-10640-00
KAIG3-RFI-EC-S-10637 00 KAIG3-RFI-EC-S-10637-00
KAIG3-RFI-EC-S-10635 00 KAIG3-RFI-EC-S-10635-00
KAIG3-RFI-MC-S-10631 00 KAIG3-RFI-MC-S-10631-00
KAIG3-RFI-MC-S-10632 00 KAIG3-RFI-MC-S-10632-00
KAIG3-RFI-EC-S-10634 00 KAIG3-RFI-EC-S-10634-00
KAIG3-RFI-CO-S-10623 00 KAIG3-RFI-CO-S-10623-00
KAIG3-RFI-CO-S-10628 00 KAIG3-RFI-CO-S-10628-00
KAIG3-RFI-CO-S-10629 00 KAIG3-RFI-CO-S-10629-00
KAIG3-RFI-CF-S-10626 00 KAIG3-RFI-CF-S-10626-00
KAIG3-RFI-CF-S-10625 00 KAIG3-RFI-CF-S-10625-00
KAIG3-RFI-CC-S-10633 00 KAIG3-RFI-CC-S-10633-00
KAIG3-RFI-WG-LS-1802 00 KAIG3-RFI-WG-LS-1802-00
KAIG3-RFI-SW-C-9228 00 KAIG3-RFI-SW-C-9228-00
KAIG3-RFI-SW-LS-1798 00 KAIG3-RFI-SW-LS-1798-00
KAIG3-RFI-SW-LS-1797 00 KAIG3-RFI-SW-LS-1797-00
KAIG3-RFI-SW-LS-1812 00 KAIG3-RFI-SW-LS-1812-00
KAIG3-RFI-SW-LS-1811 00 KAIG3-RFI-SW-LS-1811-00
KAIG3-RFI-NA-P-0400 00 KAIG3-RFI-NA-P-0400-00
KAIG3-RFI-SW-M-0399 00 KAIG3-RFI-SW-M-0399-00
KAIG3-RFI-SW-M-0398 00 KAIG3-RFI-SW-M-0398-00
KAIG3-RFI-SW-M-0397 00 KAIG3-RFI-SW-M-0397-00
KAIG3-RFI-LM-P-0396 00 KAIG3-RFI-LM-P-0396-00
KAIG3-RFI-SW-LS-1796 00 KAIG3-RFI-SW-LS-1796-00
KAIG3-RFI-SW-LS-1795 00 KAIG3-RFI-SW-LS-1795-00
KAIG3-RFI-SW-C-9410 00 KAIG3-RFI-SW-C-9410-00
KAIG3-RFI-SW-C-9409 00 KAIG3-RFI-SW-C-9409-00
KAIG3-RFI-SW-C-9408 00 KAIG3-RFI-SW-C-9408-00
KAIG3-RFI-SW-C-9407 00 KAIG3-RFI-SW-C-9407-00
KAIG3-RFI-SW-C-9406 00 KAIG3-RFI-SW-C-9406-00
KAIG3-RFI-SW-C-9405 00 KAIG3-RFI-SW-C-9405-00
KAIG3-RFI-SW-C-9399 00 KAIG3-RFI-SW-C-9399-00
KAIG3-RFI-SW-C-9398 00 KAIG3-RFI-SW-C-9398-00
KAIG3-RFI-PA-C-9404 00 KAIG3-RFI-PA-C-9404-00
KAIG3-RFI-PA-C-9403 00 KAIG3-RFI-PA-C-9403-00
KAIG3-RFI-PA-C-9402 00 KAIG3-RFI-PA-C-9402-00
KAIG3-RFI-PA-C-9401 00 KAIG3-RFI-PA-C-9401-00
KAIG3-RFI-PA-C-9400 00 KAIG3-RFI-PA-C-9400-00
KAIG3-RFI-TG-S-10476 00 KAIG3-RFI-TG-S-10476-00
KAIG3-RFI-WG-LS-1801 00 KAIG3-RFI-WG-LS-1801-00
KAIG3-RFI-WG-LS-1800 00 KAIG3-RFI-WG-LS-1800-00
KAIG3-RFI-MB-S-10612 00 KAIG3-RFI-MB-S-10612-00
KAIG3-RFI-MB-SU-3412 00 KAIG3-RFI-MB-SU-3412-00
KAIG3-RFI-MB-SU-3408 00 KAIG3-RFI-MB-SU-3408-00
KAIG3-RFI-PG-C-9416 00 KAIG3-RFI-PG-C-9416-00
KAIG3-RFI-PG-C-9415 00 KAIG3-RFI-PG-C-9415-00
KAIG3-RFI-WG-C-9414 00 KAIG3-RFI-WG-C-9414-00
KAIG3-RFI-WG-C-9413 00 KAIG3-RFI-WG-C-9413-00
KAIG3-RFI-WG-C-9368 00 KAIG3-RFI-WG-C-9368-00
KAIG3-RFI-WG-C-9423 00 KAIG3-RFI-WG-C-9423-00
KAIG3-RFI-WG-C-9422 00 KAIG3-RFI-WG-C-9422-00
KAIG3-RFI-PC-E-0691 00 KAIG3-RFI-PC-E-0691-00
KAIG3-RFI-PC-E-0684 00 KAIG3-RFI-PC-E-0684-00
KAIG3-RFI-PC-LC-0932 00 KAIG3-RFI-PC-LC-0932-00
KAIG3-RFI-RG-LC-0931 00 KAIG3-RFI-RG-LC-0931-00
KAIG3-RFI-RG-LC-0930 00 KAIG3-RFI-RG-LC-0930-00
KAIG3-RFI-PC-LC-0928 00 KAIG3-RFI-PC-LC-0928-00
KAIG3-RFI-NA-LC-0927 00 KAIG3-RFI-NA-LC-0927-00
KAIG3-RFI-EC-C-09331 00 KAIG3-RFI-EC-C-09331-00
KAIG3-RFI-WG-P-0395 00 KAIG3-RFI-WG-P-0395-00
KAIG3-RFI-SW-M-0394 00 KAIG3-RFI-SW-M-0394-00
KAIG3-RFI-SW-M-0393 00 KAIG3-RFI-SW-M-0393-00
KAIG3-RFI-NA-LC-0925 00 KAIG3-RFI-NA-LC-0925-00
KAIG3-RFI-NA-LC-0924 00 KAIG3-RFI-NA-LC-0924-00
KAIG3-RFI-NA-LC-0923 00 KAIG3-RFI-NA-LC-0923-00
KAIG3-RFI-TB-E-0688 00 KAIG3-RFI-TB-E-0688-00
KAIG3-RFI-CO-SU-03420 00 KAIG3-RFI-CO-SU-03420-00
KAIG3-RFI-MC-SU-03417 00 KAIG3-RFI-MC-SU-03417-00
KAIG3-RFI-CO-SU-03419 00 KAIG3-RFI-CO-SU-03419-00
KAIG3-RFI-PC-C-09452 00 KAIG3-RFI-PC-C-09452-00
KAIG3-RFI-MC-C-09447 00 KAIG3-RFI-MC-C-09447-00
KAIG3-RFI-CO-S-10624 00 KAIG3-RFI-CO-S-10624-00
KAIG3-RFI-CO-S-10556 01 KAIG3-RFI-CO-S-10556-01
KAIG3-RFI-MC-S-10620 00 KAIG3-RFI-MC-S-10620-00
KAIG3-RFI-CO-S-10621 00 KAIG3-RFI-CO-S-10621-00
KAIG3-RFI-CO-S-10622 00 KAIG3-RFI-CO-S-10622-00
KAIG3-RFI-MC-S-10619 00 KAIG3-RFI-MC-S-10619-00
KAIG3-RFI-CO-S-10617 00 KAIG3-RFI-CO-S-10617-00
KAIG3-RFI-MC-S-10618 00 KAIG3-RFI-MC-S-10618-00
KAIG3-RFI-CO-S-10596 00 KAIG3-RFI-CO-S-10596-00
KAIG3-RFI-CO-S-10597 00 KAIG3-RFI-CO-S-10597-00
KAIG3-RFI-CO-S-10598 00 KAIG3-RFI-CO-S-10598-00
KAIG3-RFI-CO-S-10614 00 KAIG3-RFI-CO-S-10614-00
KAIG3-RFI-CO-S-10615 00 KAIG3-RFI-CO-S-10615-00
KAIG3-RFI-LM-SU-03376 00 KAIG3-RFI-LM-SU-03376-00
KAIG3-RFI-CO-C-09417 00 KAIG3-RFI-CO-C-09417-00
KAIG3-RFI-CO-C-09418 00 KAIG3-RFI-CO-C-09418-00
KAIG3-RFI-CO-C-09419 00 KAIG3-RFI-CO-C-09419-00
KAIG3-RFI-CO-C-09420 00 KAIG3-RFI-CO-C-09420-00
KAIG3-RFI-CO-C-09421 00 KAIG3-RFI-CO-C-09421-00
KAIG3-RFI-CC-SU-03416 00 KAIG3-RFI-CC-SU-03416-00
KAIG3-RFI-CO-SU-03411 00 KAIG3-RFI-CO-SU-03411-00
KAIG3-RFI-MC-SU-03415 00 KAIG3-RFI-MC-SU-03415-00
KAIG3-RFI-CO-SU-03409 00 KAIG3-RFI-CO-SU-03409-00
KAIG3-RFI-CO-SU-03410 00 KAIG3-RFI-CO-SU-03410-00
KAIG3-RFI-CO-SU-03407 00 KAIG3-RFI-CO-SU-03407-00
KAIG3-RFI-SW-E-0687 00 KAIG3-RFI-SW-E-0687-00
KAIG3-RFI-SW-E-0686 00 KAIG3-RFI-SW-E-0686-00
KAIG3-RFI-SW-E-0551 01 KAIG3-RFI-SW-E-0551-01
KAIG3-RFI-SW-E-0550 01 KAIG3-RFI-SW-E-0550-01
KAIG3-RFI-SM-SU-03378 01 KAIG3-RFI-SM-SU-03378-01
KAIG3-RFI-SW-E-0549 01 KAIG3-RFI-SW-E-0549-01
KAIG3-RFI-CC-S-10611 00 KAIG3-RFI-CC-S-10611-00
KAIG3-RFI-MC-S-10608 00 KAIG3-RFI-MC-S-10608-00
KAIG3-RFI-MC-S-10609 00 KAIG3-RFI-MC-S-10609-00
KAIG3-RFI-CO-S-10595 00 KAIG3-RFI-CO-S-10595-00
KAIG3-RFI-CO-S-10599 00 KAIG3-RFI-CO-S-10599-00
KAIG3-RFI-CO-S-10600 00 KAIG3-RFI-CO-S-10600-00
KAIG3-RFI-CO-S-10601 00 KAIG3-RFI-CO-S-10601-00
KAIG3-RFI-CO-S-10602 00 KAIG3-RFI-CO-S-10602-00
KAIG3-RFI-CO-S-10603 00 KAIG3-RFI-CO-S-10603-00
KAIG3-RFI-CO-S-10604 00 KAIG3-RFI-CO-S-10604-00
KAIG3-RFI-CO-S-10605 00 KAIG3-RFI-CO-S-10605-00
KAIG3-RFI-CO-S-10607 00 KAIG3-RFI-CO-S-10607-00
KAIG3-RFI-CO-S-10606 00 KAIG3-RFI-CO-S-10606-00
KAIG3-RFI-CO-S-10593 00 KAIG3-RFI-CO-S-10593-00
KAIG3-RFI-CO-S-10594 00 KAIG3-RFI-CO-S-10594-00
KAIG3-RFI-SW-LS-1799 00 KAIG3-RFI-SW-LS-1799-00
KAIG3-RFI-CO-S-10478 01 KAIG3-RFI-CO-S-10478-01
KAIG3-RFI-CO-S-10461 01 KAIG3-RFI-CO-S-10461-01
KAIG3-RFI-CO-S-10054 01 KAIG3-RFI-CO-S-10054-01
KAIG3-RFI-NA-S-10449 01 KAIG3-RFI-NA-S-10449-01
KAIG3-RFI-CO-S-10460 01 KAIG3-RFI-CO-S-10460-01
KAIG3-RFI-PC-LC-0921 00 KAIG3-RFI-PC-LC-0921-00
KAIG3-RFI-WG-C-9412 00 KAIG3-RFI-WG-C-9412-00
KAIG3-RFI-WG-C-9411 00 KAIG3-RFI-WG-C-9411-00
KAIG3-RFI-TT-A-1349 00 KAIG3-RFI-TT-A-1349-00
KAIG3-RFI-AG-S-10203 01 KAIG3-RFI-AG-S-10203-01
KAIG3-RFI-PG-C-9392 00 KAIG3-RFI-PG-C-9392-00
KAIG3-RFI-PG-C-9391 00 KAIG3-RFI-PG-C-9391-00
KAIG3-RFI-PG-C-9390 00 KAIG3-RFI-PG-C-9390-00
KAIG3-RFI-PG-C-9389 00 KAIG3-RFI-PG-C-9389-00
KAIG3-RFI-AG-C-9388 00 KAIG3-RFI-AG-C-9388-00
KAIG3-RFI-CO-A-1318 00 KAIG3-RFI-CO-A-1318-00
KAIG3-RFI-PG-E-0663 01 KAIG3-RFI-PG-E-0663-01
KAIG3-RFI-SW-LC-0919 00 KAIG3-RFI-SW-LC-0919-00
KAIG3-RFI-SW-LC-0918 00 KAIG3-RFI-SW-LC-0918-00
KAIG3-RFI-CO-A-1335 00 KAIG3-RFI-CO-A-1335-00
KAIG3-RFI-CO-A-1334 00 KAIG3-RFI-CO-A-1334-00
KAIG3-RFI-CO-A-1333 00 KAIG3-RFI-CO-A-1333-00
KAIG3-RFI-CO-A-1332 00 KAIG3-RFI-CO-A-1332-00
KAIG3-RFI-CO-A-1331 00 KAIG3-RFI-CO-A-1331-00
KAIG3-RFI-CO-A-1330 00 KAIG3-RFI-CO-A-1330-00
KAIG3-RFI-CO-A-1329 00 KAIG3-RFI-CO-A-1329-00
KAIG3-RFI-CO-A-1328 00 KAIG3-RFI-CO-A-1328-00
KAIG3-RFI-CO-A-1327 00 KAIG3-RFI-CO-A-1327-00
KAIG3-RFI-CO-A-1326 00 KAIG3-RFI-CO-A-1326-00
KAIG3-RFI-CO-A-1325 00 KAIG3-RFI-CO-A-1325-00
KAIG3-RFI-CO-A-1324 00 KAIG3-RFI-CO-A-1324-00
KAIG3-RFI-CO-A-1323 00 KAIG3-RFI-CO-A-1323-00
KAIG3-RFI-CO-A-1322 00 KAIG3-RFI-CO-A-1322-00
KAIG3-RFI-CO-A-1321 00 KAIG3-RFI-CO-A-1321-00
KAIG3-RFI-CO-A-1320 00 KAIG3-RFI-CO-A-1320-00
KAIG3-RFI-CO-A-1319 00 KAIG3-RFI-CO-A-1319-00
KAIG3-RFI-EC-A-01347 00 KAIG3-RFI-EC-A-01347-00
KAIG3-RFI-EC-A-01348 00 KAIG3-RFI-EC-A-01348-00
KAIG3-RFI-CO-A-01340 00 KAIG3-RFI-CO-A-01340-00
KAIG3-RFI-MC-C-09386 00 KAIG3-RFI-MC-C-09386-00
KAIG3-RFI-CO-SU-03406 00 KAIG3-RFI-CO-SU-03406-00
KAIG3-RFI-EC-SU-03404 00 KAIG3-RFI-EC-SU-03404-00
KAIG3-RFI-CC-SU-03405 00 KAIG3-RFI-CC-SU-03405-00
KAIG3-RFI-NA-SU-03403 00 KAIG3-RFI-NA-SU-03403-00
KAIG3-RFI-SM-SU-03402 00 KAIG3-RFI-SM-SU-03402-00
KAIG3-RFI-NA-S-10583 00 KAIG3-RFI-NA-S-10583-00
KAIG3-RFI-CO-S-10590 00 KAIG3-RFI-CO-S-10590-00
KAIG3-RFI-CO-S-10591 00 KAIG3-RFI-CO-S-10591-00
KAIG3-RFI-EC-S-10584 00 KAIG3-RFI-EC-S-10584-00
KAIG3-RFI-EC-S-10585 00 KAIG3-RFI-EC-S-10585-00
KAIG3-RFI-CC-S-10586 00 KAIG3-RFI-CC-S-10586-00
KAIG3-RFI-CC-S-10587 00 KAIG3-RFI-CC-S-10587-00
KAIG3-RFI-CO-S-10588 00 KAIG3-RFI-CO-S-10588-00
KAIG3-RFI-CO-S-10589 00 KAIG3-RFI-CO-S-10589-00
KAIG3-RFI-LM-S-10561 00 KAIG3-RFI-LM-S-10561-00
KAIG3-RFI-CO-S-10573 00 KAIG3-RFI-CO-S-10573-00
KAIG3-RFI-CO-S-10574 00 KAIG3-RFI-CO-S-10574-00
KAIG3-RFI-CO-S-10575 00 KAIG3-RFI-CO-S-10575-00
KAIG3-RFI-CO-S-10576 00 KAIG3-RFI-CO-S-10576-00
KAIG3-RFI-CO-A-1317 00 KAIG3-RFI-CO-A-1317-00
KAIG3-RFI-NA-S-10579 00 KAIG3-RFI-NA-S-10579-00
KAIG3-RFI-SM-S-10581 00 KAIG3-RFI-SM-S-10581-00
KAIG3-RFI-SM-S-10577 00 KAIG3-RFI-SM-S-10577-00
KAIG3-RFI-SM-S-10578 00 KAIG3-RFI-SM-S-10578-00
KAIG3-RFI-CO-S-10582 00 KAIG3-RFI-CO-S-10582-00
KAIG3-RFI-CO-S-10521 00 KAIG3-RFI-CO-S-10521-00
KAIG3-RFI-EC-SU-03400 00 KAIG3-RFI-EC-SU-03400-00
KAIG3-RFI-MC-SU-03398 00 KAIG3-RFI-MC-SU-03398-00
KAIG3-RFI-CO-SU-03399 00 KAIG3-RFI-CO-SU-03399-00
KAIG3-RFI-PC-SU-03397 00 KAIG3-RFI-PC-SU-03397-00
KAIG3-RFI-LM-SU-03396 00 KAIG3-RFI-LM-SU-03396-00
KAIG3-RFI-CO-SU-03392 00 KAIG3-RFI-CO-SU-03392-00
KAIG3-RFI-CO-C-09365 00 KAIG3-RFI-CO-C-09365-00
KAIG3-RFI-CO-C-09364 00 KAIG3-RFI-CO-C-09364-00
KAIG3-RFI-EC-C-09361 00 KAIG3-RFI-EC-C-09361-00
KAIG3-RFI-CO-C-09362 00 KAIG3-RFI-CO-C-09362-00
KAIG3-RFI-CO-C-09363 00 KAIG3-RFI-CO-C-09363-00
KAIG3-RFI-CG-C-08837 01 KAIG3-RFI-CG-C-08837-01
KAIG3-RFI-CO-C-09340 00 KAIG3-RFI-CO-C-09340-00
KAIG3-RFI-CO-A-01338 00 KAIG3-RFI-CO-A-01338-00
KAIG3-RFI-SW-C-9381 00 KAIG3-RFI-SW-C-9381-00
KAIG3-RFI-SW-C-9380 00 KAIG3-RFI-SW-C-9380-00
KAIG3-RFI-SW-C-9379 00 KAIG3-RFI-SW-C-9379-00
KAIG3-RFI-SW-C-9378 00 KAIG3-RFI-SW-C-9378-00
KAIG3-RFI-SW-C-9377 00 KAIG3-RFI-SW-C-9377-00
KAIG3-RFI-SW-C-9376 00 KAIG3-RFI-SW-C-9376-00
KAIG3-RFI-SW-C-9375 00 KAIG3-RFI-SW-C-9375-00
KAIG3-RFI-SW-C-9374 00 KAIG3-RFI-SW-C-9374-00
KAIG3-RFI-SW-C-9373 00 KAIG3-RFI-SW-C-9373-00
KAIG3-RFI-PA-C-9372 00 KAIG3-RFI-PA-C-9372-00
KAIG3-RFI-SW-C-9371 00 KAIG3-RFI-SW-C-9371-00
KAIG3-RFI-SW-C-9370 00 KAIG3-RFI-SW-C-9370-00
KAIG3-RFI-SW-C-9369 00 KAIG3-RFI-SW-C-9369-00
KAIG3-RFI-SW-C-9360 00 KAIG3-RFI-SW-C-9360-00
KAIG3-RFI-SW-C-9359 00 KAIG3-RFI-SW-C-9359-00
KAIG3-RFI-SW-C-9358 00 KAIG3-RFI-SW-C-9358-00
KAIG3-RFI-PA-C-9357 00 KAIG3-RFI-PA-C-9357-00
KAIG3-RFI-SW-C-9356 00 KAIG3-RFI-SW-C-9356-00
KAIG3-RFI-SW-C-9355 00 KAIG3-RFI-SW-C-9355-00
KAIG3-RFI-SW-C-9354 00 KAIG3-RFI-SW-C-9354-00
KAIG3-RFI-SW-C-9353 00 KAIG3-RFI-SW-C-9353-00
KAIG3-RFI-SW-C-9346 00 KAIG3-RFI-SW-C-9346-00
KAIG3-RFI-SW-C-9352 00 KAIG3-RFI-SW-C-9352-00
KAIG3-RFI-SW-C-9351 00 KAIG3-RFI-SW-C-9351-00
KAIG3-RFI-PA-C-9350 00 KAIG3-RFI-PA-C-9350-00
KAIG3-RFI-PA-C-9349 00 KAIG3-RFI-PA-C-9349-00
KAIG3-RFI-SW-C-9344 00 KAIG3-RFI-SW-C-9344-00
KAIG3-RFI-SW-C-9059 01 KAIG3-RFI-SW-C-9059-01
KAIG3-RFI-SW-E-0683 00 KAIG3-RFI-SW-E-0683-00
KAIG3-RFI-PG-E-0662 01 KAIG3-RFI-PG-E-0662-01
KAIG3-RFI-CO-A-1314 00 KAIG3-RFI-CO-A-1314-00
KAIG3-RFI-CO-A-1316 00 KAIG3-RFI-CO-A-1316-00
KAIG3-RFI-TG-S-10466 01 KAIG3-RFI-TG-S-10466-01
KAIG3-RFI-TG-SU-3401 00 KAIG3-RFI-TG-SU-3401-00
KAIG3-RFI-CO-A-1315 00 KAIG3-RFI-CO-A-1315-00
KAIG3-RFI-CO-A-1313 00 KAIG3-RFI-CO-A-1313-00
KAIG3-RFI-TT-A-1339 00 KAIG3-RFI-TT-A-1339-00
KAIG3-RFI-WG-C-9337 00 KAIG3-RFI-WG-C-9337-00
KAIG3-RFI-WG-C-9367 00 KAIG3-RFI-WG-C-9367-00
KAIG3-RFI-WG-C-9366 00 KAIG3-RFI-WG-C-9366-00
KAIG3-RFI-TG-S-10572 00 KAIG3-RFI-TG-S-10572-00
KAIG3-RFI-TT-S-10571 00 KAIG3-RFI-TT-S-10571-00
KAIG3-RFI-CO-A-1343 00 KAIG3-RFI-CO-A-1343-00
KAIG3-RFI-SW-M-0392 00 KAIG3-RFI-SW-M-0392-00
KAIG3-RFI-CO-A-1344 00 KAIG3-RFI-CO-A-1344-00
KAIG3-RFI-PC-P-0391 00 KAIG3-RFI-PC-P-0391-00
KAIG3-RFI-CO-A-1345 00 KAIG3-RFI-CO-A-1345-00
KAIG3-RFI-CO-A-1341 00 KAIG3-RFI-CO-A-1341-00
KAIG3-RFI-MB-S-10543 00 KAIG3-RFI-MB-S-10543-00
KAIG3-RFI-CO-A-1346 00 KAIG3-RFI-CO-A-1346-00
KAIG3-RFI-CO-A-1342 00 KAIG3-RFI-CO-A-1342-00
KAIG3-RFI-CO-S-10557 00 KAIG3-RFI-CO-S-10557-00
KAIG3-RFI-MC-S-10564 00 KAIG3-RFI-MC-S-10564-00
KAIG3-RFI-MC-S-10563 00 KAIG3-RFI-MC-S-10563-00
KAIG3-RFI-MC-S-10562 00 KAIG3-RFI-MC-S-10562-00
KAIG3-RFI-LM-S-10560 00 KAIG3-RFI-LM-S-10560-00
KAIG3-RFI-CO-S-10559 00 KAIG3-RFI-CO-S-10559-00
KAIG3-RFI-CO-S-10567 00 KAIG3-RFI-CO-S-10567-00
KAIG3-RFI-CO-S-10566 00 KAIG3-RFI-CO-S-10566-00
KAIG3-RFI-CO-S-10565 00 KAIG3-RFI-CO-S-10565-00
KAIG3-RFI-EC-S-10570 00 KAIG3-RFI-EC-S-10570-00
KAIG3-RFI-PG-S-10542 00 KAIG3-RFI-PG-S-10542-00
KAIG3-RFI-EC-S-10569 00 KAIG3-RFI-EC-S-10569-00
KAIG3-RFI-WG-LS-1788 00 KAIG3-RFI-WG-LS-1788-00
KAIG3-RFI-EC-S-10568 00 KAIG3-RFI-EC-S-10568-00
KAIG3-RFI-WG-LS-1787 00 KAIG3-RFI-WG-LS-1787-00
KAIG3-RFI-CO-S-10554 00 KAIG3-RFI-CO-S-10554-00
KAIG3-RFI-LM-S-10384 01 KAIG3-RFI-LM-S-10384-01
KAIG3-RFI-CO-S-10558 00 KAIG3-RFI-CO-S-10558-00
KAIG3-RFI-PG-C-9327 00 KAIG3-RFI-PG-C-9327-00
KAIG3-RFI-PG-C-9326 00 KAIG3-RFI-PG-C-9326-00
KAIG3-RFI-PG-C-9325 00 KAIG3-RFI-PG-C-9325-00
KAIG3-RFI-PG-C-9324 00 KAIG3-RFI-PG-C-9324-00
KAIG3-RFI-WG-C-9323 00 KAIG3-RFI-WG-C-9323-00
KAIG3-RFI-WG-C-9322 00 KAIG3-RFI-WG-C-9322-00
KAIG3-RFI-WG-C-9301 00 KAIG3-RFI-WG-C-9301-00
KAIG3-RFI-FC-A-1312 00 KAIG3-RFI-FC-A-1312-00
KAIG3-RFI-WG-LS-1784 00 KAIG3-RFI-WG-LS-1784-00
KAIG3-RFI-SW-LS-1794 00 KAIG3-RFI-SW-LS-1794-00
KAIG3-RFI-SW-LS-1793 00 KAIG3-RFI-SW-LS-1793-00
KAIG3-RFI-SW-C-9348 00 KAIG3-RFI-SW-C-9348-00
KAIG3-RFI-SW-C-9347 00 KAIG3-RFI-SW-C-9347-00
KAIG3-RFI-SW-LS-1792 00 KAIG3-RFI-SW-LS-1792-00
KAIG3-RFI-SW-C-9345 00 KAIG3-RFI-SW-C-9345-00
KAIG3-RFI-SW-LS-1791 00 KAIG3-RFI-SW-LS-1791-00
KAIG3-RFI-SW-C-9343 00 KAIG3-RFI-SW-C-9343-00
KAIG3-RFI-SW-LS-1790 00 KAIG3-RFI-SW-LS-1790-00
KAIG3-RFI-SW-C-9342 00 KAIG3-RFI-SW-C-9342-00
KAIG3-RFI-SW-C-9341 00 KAIG3-RFI-SW-C-9341-00
KAIG3-RFI-SW-C-9320 00 KAIG3-RFI-SW-C-9320-00
KAIG3-RFI-SW-C-9319 00 KAIG3-RFI-SW-C-9319-00
KAIG3-RFI-SW-C-9318 00 KAIG3-RFI-SW-C-9318-00
KAIG3-RFI-SW-C-9317 00 KAIG3-RFI-SW-C-9317-00
KAIG3-RFI-SW-C-9316 00 KAIG3-RFI-SW-C-9316-00
KAIG3-RFI-CO-SU-03390 00 KAIG3-RFI-CO-SU-03390-00
KAIG3-RFI-SW-C-9299 00 KAIG3-RFI-SW-C-9299-00
KAIG3-RFI-MC-SU-03391 00 KAIG3-RFI-MC-SU-03391-00
KAIG3-RFI-SW-C-9298 00 KAIG3-RFI-SW-C-9298-00
KAIG3-RFI-CO-SU-03394 00 KAIG3-RFI-CO-SU-03394-00
KAIG3-RFI-SW-C-9220 01 KAIG3-RFI-SW-C-9220-01
KAIG3-RFI-CO-SU-03395 00 KAIG3-RFI-CO-SU-03395-00
KAIG3-RFI-SW-C-9193 01 KAIG3-RFI-SW-C-9193-01
KAIG3-RFI-MC-C-09328 00 KAIG3-RFI-MC-C-09328-00
KAIG3-RFI-PA-C-9290 00 KAIG3-RFI-PA-C-9290-00
KAIG3-RFI-MC-C-09329 00 KAIG3-RFI-MC-C-09329-00
KAIG3-RFI-EC-C-09330 00 KAIG3-RFI-EC-C-09330-00
KAIG3-RFI-MC-C-09332 00 KAIG3-RFI-MC-C-09332-00
KAIG3-RFI-SW-C-7287 01 KAIG3-RFI-SW-C-7287-01
KAIG3-RFI-SW-C-7270 01 KAIG3-RFI-SW-C-7270-01
KAIG3-RFI-SW-M-0390 00 KAIG3-RFI-SW-M-0390-00
KAIG3-RFI-PC-P-0389 00 KAIG3-RFI-PC-P-0389-00
KAIG3-RFI-PG-LC-0913 00 KAIG3-RFI-PG-LC-0913-00
KAIG3-RFI-PG-LC-0912 00 KAIG3-RFI-PG-LC-0912-00
KAIG3-RFI-SW-LS-1749 00 KAIG3-RFI-SW-LS-1749-00
KAIG3-RFI-WG-C-9339 00 KAIG3-RFI-WG-C-9339-00
KAIG3-RFI-WG-C-9338 00 KAIG3-RFI-WG-C-9338-00
KAIG3-RFI-TG-S-10466 00 KAIG3-RFI-TG-S-10466-00
KAIG3-RFI-CO-S-10556 00 KAIG3-RFI-CO-S-10556-00
KAIG3-RFI-CO-S-10539 00 KAIG3-RFI-CO-S-10539-00
KAIG3-RFI-VG-S-10544 00 KAIG3-RFI-VG-S-10544-00
KAIG3-RFI-MC-S-10540 00 KAIG3-RFI-MC-S-10540-00
KAIG3-RFI-MC-S-10541 00 KAIG3-RFI-MC-S-10541-00
KAIG3-RFI-CC-S-10546 00 KAIG3-RFI-CC-S-10546-00
KAIG3-RFI-CC-S-10547 00 KAIG3-RFI-CC-S-10547-00
KAIG3-RFI-CO-S-10548 00 KAIG3-RFI-CO-S-10548-00
KAIG3-RFI-CO-S-10550 00 KAIG3-RFI-CO-S-10550-00
KAIG3-RFI-CO-S-10549 00 KAIG3-RFI-CO-S-10549-00
KAIG3-RFI-CO-S-10551 00 KAIG3-RFI-CO-S-10551-00
KAIG3-RFI-CO-S-10553 00 KAIG3-RFI-CO-S-10553-00
KAIG3-RFI-CO-S-10529 00 KAIG3-RFI-CO-S-10529-00
KAIG3-RFI-CO-S-10555 00 KAIG3-RFI-CO-S-10555-00
KAIG3-RFI-SW-C-9288 00 KAIG3-RFI-SW-C-9288-00
KAIG3-RFI-SW-C-9315 00 KAIG3-RFI-SW-C-9315-00
KAIG3-RFI-SW-C-9314 00 KAIG3-RFI-SW-C-9314-00
KAIG3-RFI-SW-C-9313 00 KAIG3-RFI-SW-C-9313-00
KAIG3-RFI-SW-C-9312 00 KAIG3-RFI-SW-C-9312-00
KAIG3-RFI-SW-C-9311 00 KAIG3-RFI-SW-C-9311-00
KAIG3-RFI-SW-C-9310 00 KAIG3-RFI-SW-C-9310-00
KAIG3-RFI-SW-C-9309 00 KAIG3-RFI-SW-C-9309-00
KAIG3-RFI-SW-C-9308 00 KAIG3-RFI-SW-C-9308-00
KAIG3-RFI-SW-C-9307 00 KAIG3-RFI-SW-C-9307-00
KAIG3-RFI-SW-C-9306 00 KAIG3-RFI-SW-C-9306-00
KAIG3-RFI-SW-C-9294 00 KAIG3-RFI-SW-C-9294-00
KAIG3-RFI-SW-LS-1789 00 KAIG3-RFI-SW-LS-1789-00
KAIG3-RFI-SW-C-8881 01 KAIG3-RFI-SW-C-8881-01
KAIG3-RFI-SW-M-0388 00 KAIG3-RFI-SW-M-0388-00
KAIG3-RFI-SW-M-0387 00 KAIG3-RFI-SW-M-0387-00
KAIG3-RFI-SW-M-0386 00 KAIG3-RFI-SW-M-0386-00
KAIG3-RFI-SW-M-0385 00 KAIG3-RFI-SW-M-0385-00
KAIG3-RFI-SW-C-9305 00 KAIG3-RFI-SW-C-9305-00
KAIG3-RFI-SW-C-9304 00 KAIG3-RFI-SW-C-9304-00
KAIG3-RFI-SW-C-9303 00 KAIG3-RFI-SW-C-9303-00
KAIG3-RFI-SW-C-9300 00 KAIG3-RFI-SW-C-9300-00
KAIG3-RFI-SW-C-9297 00 KAIG3-RFI-SW-C-9297-00
KAIG3-RFI-SW-C-9296 00 KAIG3-RFI-SW-C-9296-00
KAIG3-RFI-SW-C-9336 00 KAIG3-RFI-SW-C-9336-00
KAIG3-RFI-SW-C-9334 00 KAIG3-RFI-SW-C-9334-00
KAIG3-RFI-SW-C-9295 00 KAIG3-RFI-SW-C-9295-00
KAIG3-RFI-SW-C-9335 00 KAIG3-RFI-SW-C-9335-00
KAIG3-RFI-SW-C-9293 00 KAIG3-RFI-SW-C-9293-00
KAIG3-RFI-SW-C-9333 00 KAIG3-RFI-SW-C-9333-00
KAIG3-RFI-SW-C-9292 00 KAIG3-RFI-SW-C-9292-00
KAIG3-RFI-SW-C-9291 00 KAIG3-RFI-SW-C-9291-00
KAIG3-RFI-PA-C-9289 00 KAIG3-RFI-PA-C-9289-00
KAIG3-RFI-SW-C-9287 00 KAIG3-RFI-SW-C-9287-00
KAIG3-RFI-PA-LS-1786 00 KAIG3-RFI-PA-LS-1786-00
KAIG3-RFI-PA-LS-1785 00 KAIG3-RFI-PA-LS-1785-00
KAIG3-RFI-PA-LS-1783 00 KAIG3-RFI-PA-LS-1783-00
KAIG3-RFI-SW-LS-1777 00 KAIG3-RFI-SW-LS-1777-00
KAIG3-RFI-SW-E-0682 00 KAIG3-RFI-SW-E-0682-00
KAIG3-RFI-SM-E-0681 00 KAIG3-RFI-SM-E-0681-00
KAIG3-RFI-PC-LC-0917 00 KAIG3-RFI-PC-LC-0917-00
KAIG3-RFI-PC-LC-0916 00 KAIG3-RFI-PC-LC-0916-00
KAIG3-RFI-GC-C-09302 00 KAIG3-RFI-GC-C-09302-00
KAIG3-RFI-CO-C-09321 00 KAIG3-RFI-CO-C-09321-00
KAIG3-RFI-CO-SU-03388 00 KAIG3-RFI-CO-SU-03388-00
KAIG3-RFI-MC-SU-03389 00 KAIG3-RFI-MC-SU-03389-00
KAIG3-RFI-CC-SU-03387 00 KAIG3-RFI-CC-SU-03387-00
KAIG3-RFI-CO-SU-03383 00 KAIG3-RFI-CO-SU-03383-00
KAIG3-RFI-CO-SU-03384 00 KAIG3-RFI-CO-SU-03384-00
KAIG3-RFI-CO-SU-03385 00 KAIG3-RFI-CO-SU-03385-00
KAIG3-RFI-CC-SU-03386 00 KAIG3-RFI-CC-SU-03386-00
KAIG3-RFI-CO-SU-03382 00 KAIG3-RFI-CO-SU-03382-00
KAIG3-RFI-EC-SU-03381 00 KAIG3-RFI-EC-SU-03381-00
KAIG3-RFI-NA-SU-03380 00 KAIG3-RFI-NA-SU-03380-00
KAIG3-RFI-CO-S-10536 00 KAIG3-RFI-CO-S-10536-00
KAIG3-RFI-CO-S-10530 00 KAIG3-RFI-CO-S-10530-00
KAIG3-RFI-CO-S-10531 00 KAIG3-RFI-CO-S-10531-00
KAIG3-RFI-CO-S-10532 00 KAIG3-RFI-CO-S-10532-00
KAIG3-RFI-CO-S-10537 00 KAIG3-RFI-CO-S-10537-00
KAIG3-RFI-CO-S-10538 00 KAIG3-RFI-CO-S-10538-00
KAIG3-RFI-VG-S-10545 00 KAIG3-RFI-VG-S-10545-00
KAIG3-RFI-MC-S-10533 00 KAIG3-RFI-MC-S-10533-00
KAIG3-RFI-MC-S-10534 00 KAIG3-RFI-MC-S-10534-00
KAIG3-RFI-MC-S-10535 00 KAIG3-RFI-MC-S-10535-00
KAIG3-RFI-CO-S-10519 00 KAIG3-RFI-CO-S-10519-00
KAIG3-RFI-CO-S-10520 00 KAIG3-RFI-CO-S-10520-00
KAIG3-RFI-CO-S-10528 00 KAIG3-RFI-CO-S-10528-00
KAIG3-RFI-CO-S-10517 00 KAIG3-RFI-CO-S-10517-00
KAIG3-RFI-CO-S-10518 00 KAIG3-RFI-CO-S-10518-00
KAIG3-RFI-CO-S-10516 00 KAIG3-RFI-CO-S-10516-00
KAIG3-RFI-EC-S-10511 00 KAIG3-RFI-EC-S-10511-00
KAIG3-RFI-CO-S-10512 00 KAIG3-RFI-CO-S-10512-00
KAIG3-RFI-CO-S-10513 00 KAIG3-RFI-CO-S-10513-00
KAIG3-RFI-CO-S-10514 00 KAIG3-RFI-CO-S-10514-00
KAIG3-RFI-TT-E-0667 01 KAIG3-RFI-TT-E-0667-01
KAIG3-RFI-TT-E-0653 02 KAIG3-RFI-TT-E-0653-02
KAIG3-RFI-SW-E-0680 00 KAIG3-RFI-SW-E-0680-00
KAIG3-RFI-PC-E-0679 00 KAIG3-RFI-PC-E-0679-00
KAIG3-RFI-MB-S-10527 00 KAIG3-RFI-MB-S-10527-00
KAIG3-RFI-TB-S-10526 00 KAIG3-RFI-TB-S-10526-00
KAIG3-RFI-MB-S-10525 00 KAIG3-RFI-MB-S-10525-00
KAIG3-RFI-MB-S-10524 00 KAIG3-RFI-MB-S-10524-00
KAIG3-RFI-MB-S-10523 00 KAIG3-RFI-MB-S-10523-00
KAIG3-RFI-MB-S-10522 00 KAIG3-RFI-MB-S-10522-00
KAIG3-RFI-WG-LS-1782 00 KAIG3-RFI-WG-LS-1782-00
KAIG3-RFI-WG-C-9275 00 KAIG3-RFI-WG-C-9275-00
KAIG3-RFI-WG-C-9274 00 KAIG3-RFI-WG-C-9274-00
KAIG3-RFI-PG-SU-3377 00 KAIG3-RFI-PG-SU-3377-00
KAIG3-RFI-PG-SU-3368 00 KAIG3-RFI-PG-SU-3368-00
KAIG3-RFI-WG-C-9278 00 KAIG3-RFI-WG-C-9278-00
KAIG3-RFI-PG-C-9277 00 KAIG3-RFI-PG-C-9277-00
KAIG3-RFI-WG-C-9276 00 KAIG3-RFI-WG-C-9276-00
KAIG3-RFI-WG-C-9271 00 KAIG3-RFI-WG-C-9271-00
KAIG3-RFI-WG-C-9270 00 KAIG3-RFI-WG-C-9270-00
KAIG3-RFI-PG-C-9269 00 KAIG3-RFI-PG-C-9269-00
KAIG3-RFI-CC-LC-0915 00 KAIG3-RFI-CC-LC-0915-00
KAIG3-RFI-WG-C-9268 00 KAIG3-RFI-WG-C-9268-00
KAIG3-RFI-WG-C-9267 00 KAIG3-RFI-WG-C-9267-00
KAIG3-RFI-WG-S-10501 00 KAIG3-RFI-WG-S-10501-00
KAIG3-RFI-WG-S-10500 00 KAIG3-RFI-WG-S-10500-00
KAIG3-RFI-PG-S-10477 00 KAIG3-RFI-PG-S-10477-00
KAIG3-RFI-SW-M-0384 00 KAIG3-RFI-SW-M-0384-00
KAIG3-RFI-CO-S-10515 00 KAIG3-RFI-CO-S-10515-00
KAIG3-RFI-NA-S-10507 00 KAIG3-RFI-NA-S-10507-00
KAIG3-RFI-NA-S-10508 00 KAIG3-RFI-NA-S-10508-00
KAIG3-RFI-EC-S-10510 00 KAIG3-RFI-EC-S-10510-00
KAIG3-RFI-CO-S-10482 00 KAIG3-RFI-CO-S-10482-00
KAIG3-RFI-CO-S-10041 01 KAIG3-RFI-CO-S-10041-01
KAIG3-RFI-NA-LC-0914 00 KAIG3-RFI-NA-LC-0914-00
KAIG3-RFI-LM-S-10486 00 KAIG3-RFI-LM-S-10486-00
KAIG3-RFI-NA-S-10468 00 KAIG3-RFI-NA-S-10468-00
KAIG3-RFI-CF-S-9693 00 KAIG3-RFI-CF-S-9693-00
KAIG3-RFI-CO-S-10506 00 KAIG3-RFI-CO-S-10506-00
KAIG3-RFI-LM-S-10066 00 KAIG3-RFI-LM-S-10066-00
KAIG3-RFI-CO-S-10451 00 KAIG3-RFI-CO-S-10451-00
KAIG3-RFI-SW-LS-1778 00 KAIG3-RFI-SW-LS-1778-00
KAIG3-RFI-PA-C-9286 00 KAIG3-RFI-PA-C-9286-00
KAIG3-RFI-PA-C-9285 00 KAIG3-RFI-PA-C-9285-00
KAIG3-RFI-SW-C-9284 00 KAIG3-RFI-SW-C-9284-00
KAIG3-RFI-SW-C-9283 00 KAIG3-RFI-SW-C-9283-00
KAIG3-RFI-SW-C-9260 00 KAIG3-RFI-SW-C-9260-00
KAIG3-RFI-SW-C-9259 00 KAIG3-RFI-SW-C-9259-00
KAIG3-RFI-SW-C-9258 00 KAIG3-RFI-SW-C-9258-00
KAIG3-RFI-SW-C-9256 00 KAIG3-RFI-SW-C-9256-00
KAIG3-RFI-SW-C-9255 00 KAIG3-RFI-SW-C-9255-00
KAIG3-RFI-SW-C-9254 00 KAIG3-RFI-SW-C-9254-00
KAIG3-RFI-SW-C-9253 00 KAIG3-RFI-SW-C-9253-00
KAIG3-RFI-SW-C-9252 00 KAIG3-RFI-SW-C-9252-00
KAIG3-RFI-SW-C-9251 00 KAIG3-RFI-SW-C-9251-00
KAIG3-RFI-SW-C-9250 00 KAIG3-RFI-SW-C-9250-00
KAIG3-RFI-SW-C-9249 00 KAIG3-RFI-SW-C-9249-00
KAIG3-RFI-SW-C-9248 00 KAIG3-RFI-SW-C-9248-00
KAIG3-RFI-SW-C-9247 00 KAIG3-RFI-SW-C-9247-00
KAIG3-RFI-SW-C-9240 00 KAIG3-RFI-SW-C-9240-00
KAIG3-RFI-SW-C-9239 00 KAIG3-RFI-SW-C-9239-00
KAIG3-RFI-SW-C-9238 00 KAIG3-RFI-SW-C-9238-00
KAIG3-RFI-SW-C-9237 00 KAIG3-RFI-SW-C-9237-00
KAIG3-RFI-SW-C-9236 00 KAIG3-RFI-SW-C-9236-00
KAIG3-RFI-SW-C-9235 00 KAIG3-RFI-SW-C-9235-00
KAIG3-RFI-SW-C-9234 00 KAIG3-RFI-SW-C-9234-00
KAIG3-RFI-SW-C-9230 00 KAIG3-RFI-SW-C-9230-00
KAIG3-RFI-SM-A-01336 00 KAIG3-RFI-SM-A-01336-00
KAIG3-RFI-SM-A-01337 00 KAIG3-RFI-SM-A-01337-00
KAIG3-RFI-CO-SU-03373 00 KAIG3-RFI-CO-SU-03373-00
KAIG3-RFI-CO-SU-03379 00 KAIG3-RFI-CO-SU-03379-00
KAIG3-RFI-SM-SU-03378 00 KAIG3-RFI-SM-SU-03378-00
KAIG3-RFI-LM-SU-03375 00 KAIG3-RFI-LM-SU-03375-00
KAIG3-RFI-LM-SU-03374 00 KAIG3-RFI-LM-SU-03374-00
KAIG3-RFI-LG-C-9282 00 KAIG3-RFI-LG-C-9282-00
KAIG3-RFI-NG-C-9280 00 KAIG3-RFI-NG-C-9280-00
KAIG3-RFI-LG-C-9281 00 KAIG3-RFI-LG-C-9281-00
KAIG3-RFI-NG-C-9279 00 KAIG3-RFI-NG-C-9279-00
KAIG3-RFI-PG-LS-1779 00 KAIG3-RFI-PG-LS-1779-00
KAIG3-RFI-WG-C-9246 00 KAIG3-RFI-WG-C-9246-00
KAIG3-RFI-PG-C-9245 00 KAIG3-RFI-PG-C-9245-00
KAIG3-RFI-PG-C-9244 00 KAIG3-RFI-PG-C-9244-00
KAIG3-RFI-PG-C-9243 00 KAIG3-RFI-PG-C-9243-00
KAIG3-RFI-PG-C-9242 00 KAIG3-RFI-PG-C-9242-00
KAIG3-RFI-CC-LC-0911 00 KAIG3-RFI-CC-LC-0911-00
KAIG3-RFI-CC-LC-0910 00 KAIG3-RFI-CC-LC-0910-00
KAIG3-RFI-NA-LC-0909 00 KAIG3-RFI-NA-LC-0909-00
KAIG3-RFI-EC-C-09266 00 KAIG3-RFI-EC-C-09266-00
KAIG3-RFI-MC-C-09262 00 KAIG3-RFI-MC-C-09262-00
KAIG3-RFI-CO-C-09263 00 KAIG3-RFI-CO-C-09263-00
KAIG3-RFI-CO-C-09264 00 KAIG3-RFI-CO-C-09264-00
KAIG3-RFI-CO-C-09265 00 KAIG3-RFI-CO-C-09265-00
KAIG3-RFI-CO-C-09261 00 KAIG3-RFI-CO-C-09261-00
KAIG3-RFI-EC-C-09241 00 KAIG3-RFI-EC-C-09241-00
KAIG3-RFI-CO-S-10489 00 KAIG3-RFI-CO-S-10489-00
KAIG3-RFI-CO-S-10490 00 KAIG3-RFI-CO-S-10490-00
KAIG3-RFI-CO-S-10505 00 KAIG3-RFI-CO-S-10505-00
KAIG3-RFI-CO-S-9910 00 KAIG3-RFI-CO-S-9910-00
KAIG3-RFI-CO-S-10488 00 KAIG3-RFI-CO-S-10488-00
KAIG3-RFI-SM-S-10501 00 KAIG3-RFI-SM-S-10501-00
KAIG3-RFI-SM-S-10502 00 KAIG3-RFI-SM-S-10502-00
KAIG3-RFI-LM-S-10496 00 KAIG3-RFI-LM-S-10496-00
KAIG3-RFI-CO-S-10499 00 KAIG3-RFI-CO-S-10499-00
KAIG3-RFI-CO-S-10458 01 KAIG3-RFI-CO-S-10458-01
KAIG3-RFI-SM-S-10487 00 KAIG3-RFI-SM-S-10487-00
KAIG3-RFI-NA-S-10491 00 KAIG3-RFI-NA-S-10491-00
KAIG3-RFI-CO-S-10492 00 KAIG3-RFI-CO-S-10492-00
KAIG3-RFI-LM-S-10493 00 KAIG3-RFI-LM-S-10493-00
KAIG3-RFI-LM-S-10495 00 KAIG3-RFI-LM-S-10495-00
KAIG3-RFI-CO-S-10286 00 KAIG3-RFI-CO-S-10286-00
KAIG3-RFI-CO-S-10058 00 KAIG3-RFI-CO-S-10058-00
KAIG3-RFI-MC-S-10032 00 KAIG3-RFI-MC-S-10032-00
KAIG3-RFI-WG-LC-0908 00 KAIG3-RFI-WG-LC-0908-00
KAIG3-RFI-WG-LC-0907 00 KAIG3-RFI-WG-LC-0907-00
KAIG3-RFI-PG-E-0678 00 KAIG3-RFI-PG-E-0678-00
KAIG3-RFI-PG-E-0677-00 00 KAIG3-RFI-PG-E-0677-00-00
KAIG3-RFI-WG-E-0675 00 KAIG3-RFI-WG-E-0675-00
KAIG3-RFI-WG-E-0674 00 KAIG3-RFI-WG-E-0674-00
KAIG3-RFI-CC-E-0676 00 KAIG3-RFI-CC-E-0676-00
KAIG3-RFI-SW-E-0673 00 KAIG3-RFI-SW-E-0673-00
KAIG3-RFI-SW-M-0383 00 KAIG3-RFI-SW-M-0383-00
KAIG3-RFI-SW-C-9232 00 KAIG3-RFI-SW-C-9232-00
KAIG3-RFI-TG-C-9233 00 KAIG3-RFI-TG-C-9233-00
KAIG3-RFI-WG-P-0382 00 KAIG3-RFI-WG-P-0382-00
KAIG3-RFI-SW-C-9231 00 KAIG3-RFI-SW-C-9231-00
KAIG3-RFI-CO-SU-03371 00 KAIG3-RFI-CO-SU-03371-00
KAIG3-RFI-CO-SU-03369 00 KAIG3-RFI-CO-SU-03369-00
KAIG3-RFI-CO-SU-03370 00 KAIG3-RFI-CO-SU-03370-00
KAIG3-RFI-LM-SU-03372 00 KAIG3-RFI-LM-SU-03372-00
KAIG3-RFI-CC-C-09209 00 KAIG3-RFI-CC-C-09209-00
KAIG3-RFI-CO-A-01310 00 KAIG3-RFI-CO-A-01310-00
KAIG3-RFI-CO-A-01311 00 KAIG3-RFI-CO-A-01311-00
KAIG3-RFI-CO-A-01250 00 KAIG3-RFI-CO-A-01250-00
KAIG3-RFI-SM-A-1243 00 KAIG3-RFI-SM-A-1243-00
KAIG3-RFI-CO-S-10414 00 KAIG3-RFI-CO-S-10414-00
KAIG3-RFI-CO-S-10413 00 KAIG3-RFI-CO-S-10413-00
KAIG3-RFI-CO-S-10072 00 KAIG3-RFI-CO-S-10072-00
KAIG3-RFI-CO-S-10484 00 KAIG3-RFI-CO-S-10484-00
KAIG3-RFI-CO-S-10480 00 KAIG3-RFI-CO-S-10480-00
KAIG3-RFI-CO-S-10481 00 KAIG3-RFI-CO-S-10481-00
KAIG3-RFI-CO-S-10483 00 KAIG3-RFI-CO-S-10483-00
KAIG3-RFI-CO-S-10479 00 KAIG3-RFI-CO-S-10479-00
KAIG3-RFI-CO-S-10385 00 KAIG3-RFI-CO-S-10385-00
KAIG3-RFI-CO-S-10387 00 KAIG3-RFI-CO-S-10387-00
KAIG3-RFI-LM-S-10485 00 KAIG3-RFI-LM-S-10485-00
KAIG3-RFI-CO-S-10412 00 KAIG3-RFI-CO-S-10412-00
KAIG3-RFI-CO-S-10400 00 KAIG3-RFI-CO-S-10400-00
KAIG3-RFI-SM-S-10341 00 KAIG3-RFI-SM-S-10341-00
KAIG3-RFI-SW-LS-1781 00 KAIG3-RFI-SW-LS-1781-00
KAIG3-RFI-SW-LS-1780 00 KAIG3-RFI-SW-LS-1780-00
KAIG3-RFI-SW-C-9229 00 KAIG3-RFI-SW-C-9229-00
KAIG3-RFI-SW-C-9227 00 KAIG3-RFI-SW-C-9227-00
KAIG3-RFI-SW-C-9226 00 KAIG3-RFI-SW-C-9226-00
KAIG3-RFI-SW-C-9225 00 KAIG3-RFI-SW-C-9225-00
KAIG3-RFI-SW-C-9224 00 KAIG3-RFI-SW-C-9224-00
KAIG3-RFI-SW-C-9223 00 KAIG3-RFI-SW-C-9223-00
KAIG3-RFI-SW-C-9222 00 KAIG3-RFI-SW-C-9222-00
KAIG3-RFI-PA-C-9187 00 KAIG3-RFI-PA-C-9187-00
KAIG3-RFI-SW-C-9221 00 KAIG3-RFI-SW-C-9221-00
KAIG3-RFI-SW-C-9220 00 KAIG3-RFI-SW-C-9220-00
KAIG3-RFI-SW-C-9219 00 KAIG3-RFI-SW-C-9219-00
KAIG3-RFI-SW-C-9218 00 KAIG3-RFI-SW-C-9218-00
KAIG3-RFI-SW-C-9217 00 KAIG3-RFI-SW-C-9217-00
KAIG3-RFI-SW-C-9216 00 KAIG3-RFI-SW-C-9216-00
KAIG3-RFI-SW-C-9215 00 KAIG3-RFI-SW-C-9215-00
KAIG3-RFI-SW-C-9214 00 KAIG3-RFI-SW-C-9214-00
KAIG3-RFI-SW-C-9213 00 KAIG3-RFI-SW-C-9213-00
KAIG3-RFI-SW-C-9212 00 KAIG3-RFI-SW-C-9212-00
KAIG3-RFI-SW-C-9211 00 KAIG3-RFI-SW-C-9211-00
KAIG3-RFI-SW-C-9210 00 KAIG3-RFI-SW-C-9210-00
KAIG3-RFI-SW-C-9200 00 KAIG3-RFI-SW-C-9200-00
KAIG3-RFI-SW-C-9199 00 KAIG3-RFI-SW-C-9199-00
KAIG3-RFI-SW-C-9198 00 KAIG3-RFI-SW-C-9198-00
KAIG3-RFI-SW-C-9197 00 KAIG3-RFI-SW-C-9197-00
KAIG3-RFI-SW-C-9196 00 KAIG3-RFI-SW-C-9196-00
KAIG3-RFI-SW-C-9195 00 KAIG3-RFI-SW-C-9195-00
KAIG3-RFI-SW-C-9194 00 KAIG3-RFI-SW-C-9194-00
KAIG3-RFI-PA-LS-1768 00 KAIG3-RFI-PA-LS-1768-00
KAIG3-RFI-SW-LS-1766 00 KAIG3-RFI-SW-LS-1766-00
KAIG3-RFI-SW-C-9193 00 KAIG3-RFI-SW-C-9193-00
KAIG3-RFI-SW-C-9192 00 KAIG3-RFI-SW-C-9192-00
KAIG3-RFI-SW-C-9191 00 KAIG3-RFI-SW-C-9191-00
KAIG3-RFI-SW-C-9190 00 KAIG3-RFI-SW-C-9190-00
KAIG3-RFI-SW-C-9186 00 KAIG3-RFI-SW-C-9186-00
KAIG3-RFI-SW-C-9185 00 KAIG3-RFI-SW-C-9185-00
KAIG3-RFI-SW-C-9184 00 KAIG3-RFI-SW-C-9184-00
KAIG3-RFI-SW-C-9183 00 KAIG3-RFI-SW-C-9183-00
KAIG3-RFI-SW-C-9182 00 KAIG3-RFI-SW-C-9182-00
KAIG3-RFI-SW-C-9175 00 KAIG3-RFI-SW-C-9175-00
KAIG3-RFI-SW-C-9174 00 KAIG3-RFI-SW-C-9174-00
KAIG3-RFI-SW-C-9173 00 KAIG3-RFI-SW-C-9173-00
KAIG3-RFI-SW-C-9172 00 KAIG3-RFI-SW-C-9172-00
KAIG3-RFI-PA-C-9189 00 KAIG3-RFI-PA-C-9189-00
KAIG3-RFI-PA-C-9188 00 KAIG3-RFI-PA-C-9188-00
KAIG3-RFI-PA-C-8931 00 KAIG3-RFI-PA-C-8931-00
KAIG3-RFI-WG-LS-1776 00 KAIG3-RFI-WG-LS-1776-00
KAIG3-RFI-WG-LS-1775 00 KAIG3-RFI-WG-LS-1775-00
KAIG3-RFI-WG-LS-1774 00 KAIG3-RFI-WG-LS-1774-00
KAIG3-RFI-WG-LS-1773 00 KAIG3-RFI-WG-LS-1773-00
KAIG3-RFI-WG-LS-1772 00 KAIG3-RFI-WG-LS-1772-00
KAIG3-RFI-WG-LS-1771 00 KAIG3-RFI-WG-LS-1771-00
KAIG3-RFI-WG-LS-1770 00 KAIG3-RFI-WG-LS-1770-00
KAIG3-RFI-WG-LS-1769 00 KAIG3-RFI-WG-LS-1769-00
KAIG3-RFI-TT-A-1309 00 KAIG3-RFI-TT-A-1309-00
KAIG3-RFI-MB-S-10465 00 KAIG3-RFI-MB-S-10465-00
KAIG3-RFI-PG-S-10464 00 KAIG3-RFI-PG-S-10464-00
KAIG3-RFI-WG-S-10463 00 KAIG3-RFI-WG-S-10463-00
KAIG3-RFI-WG-S-10462 00 KAIG3-RFI-WG-S-10462-00
KAIG3-RFI-TG-SU-3362 00 KAIG3-RFI-TG-SU-3362-00
KAIG3-RFI-PG-C-9208 00 KAIG3-RFI-PG-C-9208-00
KAIG3-RFI-PG-C-9207 00 KAIG3-RFI-PG-C-9207-00
KAIG3-RFI-PG-C-9178 00 KAIG3-RFI-PG-C-9178-00
KAIG3-RFI-PG-C-9177 00 KAIG3-RFI-PG-C-9177-00
KAIG3-RFI-SW-C-9102 00 KAIG3-RFI-SW-C-9102-00
KAIG3-RFI-SW-LS-1756 00 KAIG3-RFI-SW-LS-1756-00
KAIG3-RFI-SW-C-9132 00 KAIG3-RFI-SW-C-9132-00
KAIG3-RFI-SW-C-9131 00 KAIG3-RFI-SW-C-9131-00
KAIG3-RFI-SW-C-9130 00 KAIG3-RFI-SW-C-9130-00
KAIG3-RFI-SW-C-9128 00 KAIG3-RFI-SW-C-9128-00
KAIG3-RFI-SW-C-9127 00 KAIG3-RFI-SW-C-9127-00
KAIG3-RFI-SW-C-9126 00 KAIG3-RFI-SW-C-9126-00
KAIG3-RFI-SW-C-9110 00 KAIG3-RFI-SW-C-9110-00
KAIG3-RFI-SW-C-9109 00 KAIG3-RFI-SW-C-9109-00
KAIG3-RFI-SW-C-9108 00 KAIG3-RFI-SW-C-9108-00
KAIG3-RFI-SW-C-9107 00 KAIG3-RFI-SW-C-9107-00
KAIG3-RFI-SW-C-9106 00 KAIG3-RFI-SW-C-9106-00
KAIG3-RFI-SW-C-9105 00 KAIG3-RFI-SW-C-9105-00
KAIG3-RFI-SW-C-9104 00 KAIG3-RFI-SW-C-9104-00
KAIG3-RFI-SW-C-9103 00 KAIG3-RFI-SW-C-9103-00
KAIG3-RFI-SW-C-9100 00 KAIG3-RFI-SW-C-9100-00
KAIG3-RFI-SW-C-9099 00 KAIG3-RFI-SW-C-9099-00
KAIG3-RFI-SW-C-9097 00 KAIG3-RFI-SW-C-9097-00
KAIG3-RFI-SW-C-8926 00 KAIG3-RFI-SW-C-8926-00
KAIG3-RFI-SW-C-8925 00 KAIG3-RFI-SW-C-8925-00
KAIG3-RFI-SW-C-8924 00 KAIG3-RFI-SW-C-8924-00
KAIG3-RFI-SW-C-8923 00 KAIG3-RFI-SW-C-8923-00
KAIG3-RFI-PA-C-9129 00 KAIG3-RFI-PA-C-9129-00
KAIG3-RFI-CO-C-09018 00 KAIG3-RFI-CO-C-09018-00
KAIG3-RFI-MC-SU-03367 00 KAIG3-RFI-MC-SU-03367-00
KAIG3-RFI-CO-SU-03364 00 KAIG3-RFI-CO-SU-03364-00
KAIG3-RFI-NA-SU-03365 00 KAIG3-RFI-NA-SU-03365-00
KAIG3-RFI-EC-SU-03366 00 KAIG3-RFI-EC-SU-03366-00
KAIG3-RFI-NA-SU-03363 00 KAIG3-RFI-NA-SU-03363-00
KAIG3-RFI-CO-SU-03308 00 KAIG3-RFI-CO-SU-03308-00
KAIG3-RFI-EC-SU-3229 00 KAIG3-RFI-EC-SU-3229-00
KAIG3-RFI-CF-SU-03296 00 KAIG3-RFI-CF-SU-03296-00
KAIG3-RFI-CO-S-10054 00 KAIG3-RFI-CO-S-10054-00
KAIG3-RFI-MC-S-10474 00 KAIG3-RFI-MC-S-10474-00
KAIG3-RFI-MC-S-10475 00 KAIG3-RFI-MC-S-10475-00
KAIG3-RFI-CO-S-10473 00 KAIG3-RFI-CO-S-10473-00
KAIG3-RFI-SW-C-9039 00 KAIG3-RFI-SW-C-9039-00
KAIG3-RFI-EC-S-10472 00 KAIG3-RFI-EC-S-10472-00
KAIG3-RFI-NA-S-10467 00 KAIG3-RFI-NA-S-10467-00
KAIG3-RFI-CO-S-10469 00 KAIG3-RFI-CO-S-10469-00
KAIG3-RFI-CO-S-10470 00 KAIG3-RFI-CO-S-10470-00
KAIG3-RFI-EC-S-10410 00 KAIG3-RFI-EC-S-10410-00
KAIG3-RFI-CO-S-10338 00 KAIG3-RFI-CO-S-10338-00
KAIG3-RFI-CO-S-9935 00 KAIG3-RFI-CO-S-9935-00
KAIG3-RFI-CO-S-9934 00 KAIG3-RFI-CO-S-9934-00
KAIG3-RFI-CO-S-9827 00 KAIG3-RFI-CO-S-9827-00
KAIG3-RFI-CO-S-10017 00 KAIG3-RFI-CO-S-10017-00
KAIG3-RFI-CO-S-10019 00 KAIG3-RFI-CO-S-10019-00
KAIG3-RFI-CO-S-10018 00 KAIG3-RFI-CO-S-10018-00
KAIG3-RFI-PC-S-10357 00 KAIG3-RFI-PC-S-10357-00
KAIG3-RFI-PC-S-10358 00 KAIG3-RFI-PC-S-10358-00
KAIG3-RFI-CO-S-10369 00 KAIG3-RFI-CO-S-10369-00
KAIG3-RFI-CO-S-10478 00 KAIG3-RFI-CO-S-10478-00
KAIG3-RFI-CO-S-10424 00 KAIG3-RFI-CO-S-10424-00
KAIG3-RFI-CF-S-10247 00 KAIG3-RFI-CF-S-10247-00
KAIG3-RFI-CO-C-09019 00 KAIG3-RFI-CO-C-09019-00
KAIG3-RFI-CO-S-10302 00 KAIG3-RFI-CO-S-10302-00
KAIG3-RFI-NA-LC-0906 00 KAIG3-RFI-NA-LC-0906-00
KAIG3-RFI-LM-LC-0905 00 KAIG3-RFI-LM-LC-0905-00
KAIG3-RFI-PA-C-9091 00 KAIG3-RFI-PA-C-9091-00
KAIG3-RFI-SW-M-0380 00 KAIG3-RFI-SW-M-0380-00
KAIG3-RFI-SW-C-9202 00 KAIG3-RFI-SW-C-9202-00
KAIG3-RFI-CO-A-01308 00 KAIG3-RFI-CO-A-01308-00
KAIG3-RFI-CO-A-01307 00 KAIG3-RFI-CO-A-01307-00
KAIG3-RFI-CO-C-09205 00 KAIG3-RFI-CO-C-09205-00
KAIG3-RFI-SW-C-9201 00 KAIG3-RFI-SW-C-9201-00
KAIG3-RFI-CO-C-09203 00 KAIG3-RFI-CO-C-09203-00
KAIG3-RFI-MC-C-09204 00 KAIG3-RFI-MC-C-09204-00
KAIG3-RFI-CO-C-09206 00 KAIG3-RFI-CO-C-09206-00
KAIG3-RFI-CO-C-09181 00 KAIG3-RFI-CO-C-09181-00
KAIG3-RFI-VG-SU-03360 00 KAIG3-RFI-VG-SU-03360-00
KAIG3-RFI-CO-SU-03361 00 KAIG3-RFI-CO-SU-03361-00
KAIG3-RFI-CO-SU-03358 00 KAIG3-RFI-CO-SU-03358-00
KAIG3-RFI-CO-SU-03359 00 KAIG3-RFI-CO-SU-03359-00
KAIG3-RFI-NA-SU-03357 00 KAIG3-RFI-NA-SU-03357-00
KAIG3-RFI-CO-S-10460 00 KAIG3-RFI-CO-S-10460-00
KAIG3-RFI-CO-S-10461 00 KAIG3-RFI-CO-S-10461-00
KAIG3-RFI-CO-S-10453 00 KAIG3-RFI-CO-S-10453-00
KAIG3-RFI-CO-S-10458 00 KAIG3-RFI-CO-S-10458-00
KAIG3-RFI-CO-S-10450 00 KAIG3-RFI-CO-S-10450-00
KAIG3-RFI-VG-S-10459 00 KAIG3-RFI-VG-S-10459-00
KAIG3-RFI-NA-S-10452 00 KAIG3-RFI-NA-S-10452-00
KAIG3-RFI-CO-S-10457 00 KAIG3-RFI-CO-S-10457-00
KAIG3-RFI-CO-S-10455 00 KAIG3-RFI-CO-S-10455-00
KAIG3-RFI-VG-S-10444 00 KAIG3-RFI-VG-S-10444-00
KAIG3-RFI-VG-S-10446 00 KAIG3-RFI-VG-S-10446-00
KAIG3-RFI-VG-S-10445 00 KAIG3-RFI-VG-S-10445-00
KAIG3-RFI-NA-S-10447 00 KAIG3-RFI-NA-S-10447-00
KAIG3-RFI-NA-S-10448 00 KAIG3-RFI-NA-S-10448-00
KAIG3-RFI-NA-S-10449 00 KAIG3-RFI-NA-S-10449-00
KAIG3-RFI-WG-S-10393 00 KAIG3-RFI-WG-S-10393-00
KAIG3-RFI-WG-S-10392 00 KAIG3-RFI-WG-S-10392-00
KAIG3-RFI-SW-E-0672 00 KAIG3-RFI-SW-E-0672-00
KAIG3-RFI-SW-E-0671 00 KAIG3-RFI-SW-E-0671-00
KAIG3-RFI-SW-E-0668 00 KAIG3-RFI-SW-E-0668-00
KAIG3-RFI-TT-E-0667 00 KAIG3-RFI-TT-E-0667-00
KAIG3-RFI-SW-C-9171 00 KAIG3-RFI-SW-C-9171-00
KAIG3-RFI-TT-E-0654 01 KAIG3-RFI-TT-E-0654-01
KAIG3-RFI-SW-C-9170 00 KAIG3-RFI-SW-C-9170-00
KAIG3-RFI-SW-C-9169 00 KAIG3-RFI-SW-C-9169-00
KAIG3-RFI-SW-C-9168 00 KAIG3-RFI-SW-C-9168-00
KAIG3-RFI-TT-E-0653 01 KAIG3-RFI-TT-E-0653-01
KAIG3-RFI-SW-C-9167 00 KAIG3-RFI-SW-C-9167-00
KAIG3-RFI-SW-C-9166 00 KAIG3-RFI-SW-C-9166-00
KAIG3-RFI-SW-C-9165 00 KAIG3-RFI-SW-C-9165-00
KAIG3-RFI-SW-LS-1761 00 KAIG3-RFI-SW-LS-1761-00
KAIG3-RFI-SW-C-9164 00 KAIG3-RFI-SW-C-9164-00
KAIG3-RFI-SW-C-9163 00 KAIG3-RFI-SW-C-9163-00
KAIG3-RFI-SW-C-9162 00 KAIG3-RFI-SW-C-9162-00
KAIG3-RFI-SW-C-9161 00 KAIG3-RFI-SW-C-9161-00
KAIG3-RFI-SW-C-9160 00 KAIG3-RFI-SW-C-9160-00
KAIG3-RFI-SW-C-9159 00 KAIG3-RFI-SW-C-9159-00
KAIG3-RFI-SW-C-9140 00 KAIG3-RFI-SW-C-9140-00
KAIG3-RFI-SW-C-9139 00 KAIG3-RFI-SW-C-9139-00
KAIG3-RFI-MB-LC-0903 00 KAIG3-RFI-MB-LC-0903-00
KAIG3-RFI-SW-C-9138 00 KAIG3-RFI-SW-C-9138-00
KAIG3-RFI-SW-C-9137 00 KAIG3-RFI-SW-C-9137-00
KAIG3-RFI-SW-C-9136 00 KAIG3-RFI-SW-C-9136-00
KAIG3-RFI-TT-LC-0884 01 KAIG3-RFI-TT-LC-0884-01
KAIG3-RFI-TT-LC-0881 01 KAIG3-RFI-TT-LC-0881-01
KAIG3-RFI-SW-C-9135 00 KAIG3-RFI-SW-C-9135-00
KAIG3-RFI-TT-LC-0880 01 KAIG3-RFI-TT-LC-0880-01
KAIG3-RFI-SW-C-9134 00 KAIG3-RFI-SW-C-9134-00
KAIG3-RFI-TT-LC-0879 01 KAIG3-RFI-TT-LC-0879-01
KAIG3-RFI-SW-C-9133 00 KAIG3-RFI-SW-C-9133-00
KAIG3-RFI-PA-C-8932 00 KAIG3-RFI-PA-C-8932-00
KAIG3-RFI-MB-S-10443 00 KAIG3-RFI-MB-S-10443-00
KAIG3-RFI-MB-S-10442 00 KAIG3-RFI-MB-S-10442-00
KAIG3-RFI-WG-LS-1765 00 KAIG3-RFI-WG-LS-1765-00
KAIG3-RFI-SW-C-8929 00 KAIG3-RFI-SW-C-8929-00
KAIG3-RFI-WG-LS-1764 00 KAIG3-RFI-WG-LS-1764-00
KAIG3-RFI-SW-C-8928 00 KAIG3-RFI-SW-C-8928-00
KAIG3-RFI-SW-C-8927 00 KAIG3-RFI-SW-C-8927-00
KAIG3-RFI-PA-LS-1763 00 KAIG3-RFI-PA-LS-1763-00
KAIG3-RFI-MB-SU-3356 00 KAIG3-RFI-MB-SU-3356-00
KAIG3-RFI-PA-LS-1762 00 KAIG3-RFI-PA-LS-1762-00
KAIG3-RFI-MB-SU-3352 00 KAIG3-RFI-MB-SU-3352-00
KAIG3-RFI-WG-C-9176 00 KAIG3-RFI-WG-C-9176-00
KAIG3-RFI-MB-C-9158 00 KAIG3-RFI-MB-C-9158-00
KAIG3-RFI-CO-C-09151 00 KAIG3-RFI-CO-C-09151-00
KAIG3-RFI-WG-C-9157 00 KAIG3-RFI-WG-C-9157-00
KAIG3-RFI-WG-C-9156 00 KAIG3-RFI-WG-C-9156-00
KAIG3-RFI-SM-A-01303 00 KAIG3-RFI-SM-A-01303-00
KAIG3-RFI-WG-C-9155 00 KAIG3-RFI-WG-C-9155-00
KAIG3-RFI-SM-A-01304 00 KAIG3-RFI-SM-A-01304-00
KAIG3-RFI-SM-A-01305 00 KAIG3-RFI-SM-A-01305-00
KAIG3-RFI-SM-A-01306 00 KAIG3-RFI-SM-A-01306-00
KAIG3-RFI-WG-C-9154 00 KAIG3-RFI-WG-C-9154-00
KAIG3-RFI-MC-SU-03354 00 KAIG3-RFI-MC-SU-03354-00
KAIG3-RFI-CO-SU-03353 00 KAIG3-RFI-CO-SU-03353-00
KAIG3-RFI-CO-SU-03351 00 KAIG3-RFI-CO-SU-03351-00
KAIG3-RFI-CO-SU-03349 00 KAIG3-RFI-CO-SU-03349-00
KAIG3-RFI-CO-SU-03350 00 KAIG3-RFI-CO-SU-03350-00
KAIG3-RFI-CO-SU-03348 00 KAIG3-RFI-CO-SU-03348-00
KAIG3-RFI-LM-S-10436 00 KAIG3-RFI-LM-S-10436-00
KAIG3-RFI-CO-S-10432 00 KAIG3-RFI-CO-S-10432-00
KAIG3-RFI-MC-S-10438 00 KAIG3-RFI-MC-S-10438-00
KAIG3-RFI-MC-S-10439 00 KAIG3-RFI-MC-S-10439-00
KAIG3-RFI-GC-C-9153 00 KAIG3-RFI-GC-C-9153-00
KAIG3-RFI-CO-S-10433 00 KAIG3-RFI-CO-S-10433-00
KAIG3-RFI-CO-S-10434 00 KAIG3-RFI-CO-S-10434-00
KAIG3-RFI-MC-S-10437 00 KAIG3-RFI-MC-S-10437-00
KAIG3-RFI-NA-S-10430 00 KAIG3-RFI-NA-S-10430-00
KAIG3-RFI-CC-S-10431 00 KAIG3-RFI-CC-S-10431-00
KAIG3-RFI-GC-C-9152 00 KAIG3-RFI-GC-C-9152-00
KAIG3-RFI-CO-S-10422 00 KAIG3-RFI-CO-S-10422-00
KAIG3-RFI-CO-S-10423 00 KAIG3-RFI-CO-S-10423-00
KAIG3-RFI-CO-S-10425 00 KAIG3-RFI-CO-S-10425-00
KAIG3-RFI-CO-S-10426 00 KAIG3-RFI-CO-S-10426-00
KAIG3-RFI-NA-S-10428 00 KAIG3-RFI-NA-S-10428-00
KAIG3-RFI-NA-S-10429 00 KAIG3-RFI-NA-S-10429-00
KAIG3-RFI-CO-S-10418 00 KAIG3-RFI-CO-S-10418-00
KAIG3-RFI-CO-S-10419 00 KAIG3-RFI-CO-S-10419-00
KAIG3-RFI-CO-S-10420 00 KAIG3-RFI-CO-S-10420-00
KAIG3-RFI-DG-E-0645 01 KAIG3-RFI-DG-E-0645-01
KAIG3-RFI-PG-E-0663 00 KAIG3-RFI-PG-E-0663-00
KAIG3-RFI-PG-E-0662 00 KAIG3-RFI-PG-E-0662-00
KAIG3-RFI-LM-LC-0893 02 KAIG3-RFI-LM-LC-0893-02
KAIG3-RFI-SW-LC-0899 00 KAIG3-RFI-SW-LC-0899-00
KAIG3-RFI-SW-LC-0898 00 KAIG3-RFI-SW-LC-0898-00
KAIG3-RFI-SW-LS-1753 00 KAIG3-RFI-SW-LS-1753-00
KAIG3-RFI-SW-LS-1750 00 KAIG3-RFI-SW-LS-1750-00
KAIG3-RFI-SW-C-9098 00 KAIG3-RFI-SW-C-9098-00
KAIG3-RFI-SW-C-9096 00 KAIG3-RFI-SW-C-9096-00
KAIG3-RFI-SW-C-9095 00 KAIG3-RFI-SW-C-9095-00
KAIG3-RFI-SW-C-9094 00 KAIG3-RFI-SW-C-9094-00
KAIG3-RFI-SW-C-9093 00 KAIG3-RFI-SW-C-9093-00
KAIG3-RFI-SW-C-9092 00 KAIG3-RFI-SW-C-9092-00
KAIG3-RFI-SW-C-9090 00 KAIG3-RFI-SW-C-9090-00
KAIG3-RFI-SW-C-9089 00 KAIG3-RFI-SW-C-9089-00
KAIG3-RFI-SW-C-9070 00 KAIG3-RFI-SW-C-9070-00
KAIG3-RFI-SW-C-9069 00 KAIG3-RFI-SW-C-9069-00
KAIG3-RFI-SW-C-9068 00 KAIG3-RFI-SW-C-9068-00
KAIG3-RFI-WG-C-9180 00 KAIG3-RFI-WG-C-9180-00
KAIG3-RFI-PG-C-9179 00 KAIG3-RFI-PG-C-9179-00
KAIG3-RFI-SW-C-9060 00 KAIG3-RFI-SW-C-9060-00
KAIG3-RFI-PA-LS-1755 00 KAIG3-RFI-PA-LS-1755-00
KAIG3-RFI-PA-LS-1754 00 KAIG3-RFI-PA-LS-1754-00
KAIG3-RFI-TG-LS-1760 00 KAIG3-RFI-TG-LS-1760-00
KAIG3-RFI-MC-C-09113 00 KAIG3-RFI-MC-C-09113-00
KAIG3-RFI-CO-C-09111 00 KAIG3-RFI-CO-C-09111-00
KAIG3-RFI-TG-LS-1759 00 KAIG3-RFI-TG-LS-1759-00
KAIG3-RFI-TG-LS-1758 00 KAIG3-RFI-TG-LS-1758-00
KAIG3-RFI-CO-C-09141 00 KAIG3-RFI-CO-C-09141-00
KAIG3-RFI-TG-LS-1757 00 KAIG3-RFI-TG-LS-1757-00
KAIG3-RFI-CO-C-09142 00 KAIG3-RFI-CO-C-09142-00
KAIG3-RFI-WG-SU-3347 00 KAIG3-RFI-WG-SU-3347-00
KAIG3-RFI-CO-C-09143 00 KAIG3-RFI-CO-C-09143-00
KAIG3-RFI-WG-C-9150 00 KAIG3-RFI-WG-C-9150-00
KAIG3-RFI-PG-C-9149 00 KAIG3-RFI-PG-C-9149-00
KAIG3-RFI-WG-C-9148 00 KAIG3-RFI-WG-C-9148-00
KAIG3-RFI-EC-C-09144 00 KAIG3-RFI-EC-C-09144-00
KAIG3-RFI-PG-C-9147 00 KAIG3-RFI-PG-C-9147-00
KAIG3-RFI-WG-C-9146 00 KAIG3-RFI-WG-C-9146-00
KAIG3-RFI-WG-C-9145 00 KAIG3-RFI-WG-C-9145-00
KAIG3-RFI-MC-C-09112 00 KAIG3-RFI-MC-C-09112-00
KAIG3-RFI-CO-C-09115 00 KAIG3-RFI-CO-C-09115-00
KAIG3-RFI-VG-C-9088 00 KAIG3-RFI-VG-C-9088-00
KAIG3-RFI-VG-C-08655 01 KAIG3-RFI-VG-C-08655-01
KAIG3-RFI-CO-SU-03343 00 KAIG3-RFI-CO-SU-03343-00
KAIG3-RFI-LM-A-01270 01 KAIG3-RFI-LM-A-01270-01
KAIG3-RFI-CO-SU-03342 00 KAIG3-RFI-CO-SU-03342-00
KAIG3-RFI-EC-SU-03344 00 KAIG3-RFI-EC-SU-03344-00
KAIG3-RFI-EC-SU-03345 00 KAIG3-RFI-EC-SU-03345-00
KAIG3-RFI-CO-SU-03346 00 KAIG3-RFI-CO-SU-03346-00
KAIG3-RFI-CO-S-8116 01 KAIG3-RFI-CO-S-8116-01
KAIG3-RFI-CO-S-7432 01 KAIG3-RFI-CO-S-7432-01
KAIG3-RFI-CO-S-7749 01 KAIG3-RFI-CO-S-7749-01
KAIG3-RFI-CO-S-10403 00 KAIG3-RFI-CO-S-10403-00
KAIG3-RFI-CC-S-10404 00 KAIG3-RFI-CC-S-10404-00
KAIG3-RFI-CC-S-10405 00 KAIG3-RFI-CC-S-10405-00
KAIG3-RFI-CO-S-10049 01 KAIG3-RFI-CO-S-10049-01
KAIG3-RFI-EC-S-10406 00 KAIG3-RFI-EC-S-10406-00
KAIG3-RFI-EC-S-10407 00 KAIG3-RFI-EC-S-10407-00
KAIG3-RFI-EC-S-10408 00 KAIG3-RFI-EC-S-10408-00
KAIG3-RFI-EC-S-10409 00 KAIG3-RFI-EC-S-10409-00
KAIG3-RFI-CO-S-10411 00 KAIG3-RFI-CO-S-10411-00
KAIG3-RFI-CO-S-10415 00 KAIG3-RFI-CO-S-10415-00
KAIG3-RFI-CO-S-10416 00 KAIG3-RFI-CO-S-10416-00
KAIG3-RFI-CO-S-10417 00 KAIG3-RFI-CO-S-10417-00
KAIG3-RFI-CO-S-10399 00 KAIG3-RFI-CO-S-10399-00
KAIG3-RFI-CO-S-10397 00 KAIG3-RFI-CO-S-10397-00
KAIG3-RFI-CO-S-10398 00 KAIG3-RFI-CO-S-10398-00
KAIG3-RFI-LM-S-10401 00 KAIG3-RFI-LM-S-10401-00
KAIG3-RFI-CO-S-7280 01 KAIG3-RFI-CO-S-7280-01
KAIG3-RFI-CO-S-7280 00 KAIG3-RFI-CO-S-7280-00
KAIG3-RFI-LM-SU-03337 00 KAIG3-RFI-LM-SU-03337-00
KAIG3-RFI-MC-SU-03339 00 KAIG3-RFI-MC-SU-03339-00
KAIG3-RFI-CC-SU-03319 00 KAIG3-RFI-CC-SU-03319-00
KAIG3-RFI-CO-SU-03336 00 KAIG3-RFI-CO-SU-03336-00
KAIG3-RFI-CO-S-10402 00 KAIG3-RFI-CO-S-10402-00
KAIG3-RFI-SM-P-0379 00 KAIG3-RFI-SM-P-0379-00
KAIG3-RFI-SW-M-0378 00 KAIG3-RFI-SW-M-0378-00
KAIG3-RFI-SW-M-0376 00 KAIG3-RFI-SW-M-0376-00
KAIG3-RFI-SW-C-9119 00 KAIG3-RFI-SW-C-9119-00
KAIG3-RFI-SW-C-9118 00 KAIG3-RFI-SW-C-9118-00
KAIG3-RFI-SW-C-9125 00 KAIG3-RFI-SW-C-9125-00
KAIG3-RFI-SW-C-9123 00 KAIG3-RFI-SW-C-9123-00
KAIG3-RFI-SW-C-9121 00 KAIG3-RFI-SW-C-9121-00
KAIG3-RFI-SW-C-9124 00 KAIG3-RFI-SW-C-9124-00
KAIG3-RFI-SW-C-9122 00 KAIG3-RFI-SW-C-9122-00
KAIG3-RFI-SW-C-9120 00 KAIG3-RFI-SW-C-9120-00
KAIG3-RFI-SM-SU-03233 01 KAIG3-RFI-SM-SU-03233-01
KAIG3-RFI-TG-C-9117 00 KAIG3-RFI-TG-C-9117-00
KAIG3-RFI-TG-C-9116 00 KAIG3-RFI-TG-C-9116-00
KAIG3-RFI-WG-C-9114 00 KAIG3-RFI-WG-C-9114-00
KAIG3-RFI-PG-SU-3322 00 KAIG3-RFI-PG-SU-3322-00
KAIG3-RFI-PG-S-10327 00 KAIG3-RFI-PG-S-10327-00
KAIG3-RFI-CO-S-7282 01 KAIG3-RFI-CO-S-7282-01
KAIG3-RFI-CO-S-7282 00 KAIG3-RFI-CO-S-7282-00
KAIG3-RFI-SW-C-8936 00 KAIG3-RFI-SW-C-8936-00
KAIG3-RFI-MC-S-10389 00 KAIG3-RFI-MC-S-10389-00
KAIG3-RFI-LM-S-10383 00 KAIG3-RFI-LM-S-10383-00
KAIG3-RFI-LM-S-10384 00 KAIG3-RFI-LM-S-10384-00
KAIG3-RFI-NA-S-10388 00 KAIG3-RFI-NA-S-10388-00
KAIG3-RFI-MC-S-10390 00 KAIG3-RFI-MC-S-10390-00
KAIG3-RFI-MC-S-10391 00 KAIG3-RFI-MC-S-10391-00
KAIG3-RFI-CO-S-10377 00 KAIG3-RFI-CO-S-10377-00
KAIG3-RFI-CO-S-10378 00 KAIG3-RFI-CO-S-10378-00
KAIG3-RFI-PC-S-10353 00 KAIG3-RFI-PC-S-10353-00
KAIG3-RFI-PC-S-10354 00 KAIG3-RFI-PC-S-10354-00
KAIG3-RFI-PC-S-10355 00 KAIG3-RFI-PC-S-10355-00
KAIG3-RFI-CO-S-10379 00 KAIG3-RFI-CO-S-10379-00
KAIG3-RFI-CO-S-10380 00 KAIG3-RFI-CO-S-10380-00
KAIG3-RFI-CO-S-10381 00 KAIG3-RFI-CO-S-10381-00
KAIG3-RFI-LM-S-10382 00 KAIG3-RFI-LM-S-10382-00
KAIG3-RFI-CO-S-10376 00 KAIG3-RFI-CO-S-10376-00
KAIG3-RFI-CO-S-10359 00 KAIG3-RFI-CO-S-10359-00
KAIG3-RFI-PC-P-0377 00 KAIG3-RFI-PC-P-0377-00
KAIG3-RFI-CC-LC-0897 00 KAIG3-RFI-CC-LC-0897-00
KAIG3-RFI-CC-LC-0896 00 KAIG3-RFI-CC-LC-0896-00
KAIG3-RFI-PG-LC-0895 00 KAIG3-RFI-PG-LC-0895-00
KAIG3-RFI-PG-LC-0894 00 KAIG3-RFI-PG-LC-0894-00
KAIG3-RFI-LM-LC-0893 01 KAIG3-RFI-LM-LC-0893-01
KAIG3-RFI-CF-E-0665 00 KAIG3-RFI-CF-E-0665-00
KAIG3-RFI-SM-E-0664 00 KAIG3-RFI-SM-E-0664-00
KAIG3-RFI-LM-S-10124 00 KAIG3-RFI-LM-S-10124-00
KAIG3-RFI-CO-S-10323 00 KAIG3-RFI-CO-S-10323-00
KAIG3-RFI-CO-S-10367 00 KAIG3-RFI-CO-S-10367-00
KAIG3-RFI-CO-S-10373 00 KAIG3-RFI-CO-S-10373-00
KAIG3-RFI-CO-S-10375 00 KAIG3-RFI-CO-S-10375-00
KAIG3-RFI-CO-S-10254 00 KAIG3-RFI-CO-S-10254-00
KAIG3-RFI-CO-SU-03332 00 KAIG3-RFI-CO-SU-03332-00
KAIG3-RFI-EC-C-09085 00 KAIG3-RFI-EC-C-09085-00
KAIG3-RFI-MC-C-09076 00 KAIG3-RFI-MC-C-09076-00
KAIG3-RFI-MC-C-09077 00 KAIG3-RFI-MC-C-09077-00
KAIG3-RFI-CO-C-09078 00 KAIG3-RFI-CO-C-09078-00
KAIG3-RFI-CO-C-09079 00 KAIG3-RFI-CO-C-09079-00
KAIG3-RFI-CO-C-09075 00 KAIG3-RFI-CO-C-09075-00
KAIG3-RFI-SW-C-8290 00 KAIG3-RFI-SW-C-8290-00
KAIG3-RFI-CO-S-10362 00 KAIG3-RFI-CO-S-10362-00
KAIG3-RFI-CO-S-10363 00 KAIG3-RFI-CO-S-10363-00
KAIG3-RFI-CO-S-10364 00 KAIG3-RFI-CO-S-10364-00
KAIG3-RFI-CO-S-10365 00 KAIG3-RFI-CO-S-10365-00
KAIG3-RFI-CO-S-10366 00 KAIG3-RFI-CO-S-10366-00
KAIG3-RFI-CO-S-10370 00 KAIG3-RFI-CO-S-10370-00
KAIG3-RFI-CC-S-10371 00 KAIG3-RFI-CC-S-10371-00
KAIG3-RFI-CO-S-10372 00 KAIG3-RFI-CO-S-10372-00
KAIG3-RFI-CO-S-10374 00 KAIG3-RFI-CO-S-10374-00
KAIG3-RFI-CO-S-10348 00 KAIG3-RFI-CO-S-10348-00
KAIG3-RFI-CO-S-10349 00 KAIG3-RFI-CO-S-10349-00
KAIG3-RFI-CO-S-10350 00 KAIG3-RFI-CO-S-10350-00
KAIG3-RFI-CO-S-10351 00 KAIG3-RFI-CO-S-10351-00
KAIG3-RFI-CO-S-10352 00 KAIG3-RFI-CO-S-10352-00
KAIG3-RFI-WG-C-9080 00 KAIG3-RFI-WG-C-9080-00
KAIG3-RFI-WG-LS-1752 00 KAIG3-RFI-WG-LS-1752-00
KAIG3-RFI-MB-A-1302 00 KAIG3-RFI-MB-A-1302-00
KAIG3-RFI-MB-A-1301 00 KAIG3-RFI-MB-A-1301-00
KAIG3-RFI-MB-A-1300 00 KAIG3-RFI-MB-A-1300-00
KAIG3-RFI-PG-C-9087 00 KAIG3-RFI-PG-C-9087-00
KAIG3-RFI-PG-C-9086 00 KAIG3-RFI-PG-C-9086-00
KAIG3-RFI-TG-C-9049 00 KAIG3-RFI-TG-C-9049-00
KAIG3-RFI-WG-C-9084 00 KAIG3-RFI-WG-C-9084-00
KAIG3-RFI-WG-C-9083 00 KAIG3-RFI-WG-C-9083-00
KAIG3-RFI-WG-C-9082 00 KAIG3-RFI-WG-C-9082-00
KAIG3-RFI-WG-C-9081 00 KAIG3-RFI-WG-C-9081-00
KAIG3-RFI-TG-S-10343 00 KAIG3-RFI-TG-S-10343-00
KAIG3-RFI-WG-C-9074 00 KAIG3-RFI-WG-C-9074-00
KAIG3-RFI-WG-C-9073 00 KAIG3-RFI-WG-C-9073-00
KAIG3-RFI-WG-C-9055 00 KAIG3-RFI-WG-C-9055-00
KAIG3-RFI-WG-C-9048 00 KAIG3-RFI-WG-C-9048-00
KAIG3-RFI-WG-C-9054 00 KAIG3-RFI-WG-C-9054-00
KAIG3-RFI-CO-SS-0439 00 KAIG3-RFI-CO-SS-0439-00
KAIG3-RFI-SM-A-01295 00 KAIG3-RFI-SM-A-01295-00
KAIG3-RFI-SM-A-01296 00 KAIG3-RFI-SM-A-01296-00
KAIG3-RFI-EC-C-09050 00 KAIG3-RFI-EC-C-09050-00
KAIG3-RFI-NA-C-9052 00 KAIG3-RFI-NA-C-9052-00
KAIG3-RFI-NA-C-9053 00 KAIG3-RFI-NA-C-9053-00
KAIG3-RFI-NG-C-9071 00 KAIG3-RFI-NG-C-9071-00
KAIG3-RFI-CO-S-10322 00 KAIG3-RFI-CO-S-10322-00
KAIG3-RFI-CO-S-10324 00 KAIG3-RFI-CO-S-10324-00
KAIG3-RFI-CO-S-10325 00 KAIG3-RFI-CO-S-10325-00
KAIG3-RFI-CO-S-10326 00 KAIG3-RFI-CO-S-10326-00
KAIG3-RFI-NA-S-10231 00 KAIG3-RFI-NA-S-10231-00
KAIG3-RFI-CO-S-10310 00 KAIG3-RFI-CO-S-10310-00
KAIG3-RFI-CO-S-10311 00 KAIG3-RFI-CO-S-10311-00
KAIG3-RFI-VG-S-10319 00 KAIG3-RFI-VG-S-10319-00
KAIG3-RFI-CO-SU-03320 00 KAIG3-RFI-CO-SU-03320-00
KAIG3-RFI-CO-SU-03321 00 KAIG3-RFI-CO-SU-03321-00
KAIG3-RFI-NA-SU-03316 00 KAIG3-RFI-NA-SU-03316-00
KAIG3-RFI-CO-SU-03317 00 KAIG3-RFI-CO-SU-03317-00
KAIG3-RFI-VG-SU-03318 00 KAIG3-RFI-VG-SU-03318-00
KAIG3-RFI-CO-SU-03333 00 KAIG3-RFI-CO-SU-03333-00
KAIG3-RFI-CO-SU-03334 00 KAIG3-RFI-CO-SU-03334-00
KAIG3-RFI-MC-SU-03330 00 KAIG3-RFI-MC-SU-03330-00
KAIG3-RFI-SM-SU-03331 00 KAIG3-RFI-SM-SU-03331-00
KAIG3-RFI-EC-SU-03326 00 KAIG3-RFI-EC-SU-03326-00
KAIG3-RFI-EC-SU-03324 00 KAIG3-RFI-EC-SU-03324-00
KAIG3-RFI-CO-SU-03327 00 KAIG3-RFI-CO-SU-03327-00
KAIG3-RFI-SM-SU-03328 00 KAIG3-RFI-SM-SU-03328-00
KAIG3-RFI-EC-SU-03325 00 KAIG3-RFI-EC-SU-03325-00
KAIG3-RFI-EC-SU-03323 00 KAIG3-RFI-EC-SU-03323-00
KAIG3-RFI-SW-C-9067 00 KAIG3-RFI-SW-C-9067-00
KAIG3-RFI-PC-S-10356 00 KAIG3-RFI-PC-S-10356-00
KAIG3-RFI-SW-C-9066 00 KAIG3-RFI-SW-C-9066-00
KAIG3-RFI-MC-S-10344 00 KAIG3-RFI-MC-S-10344-00
KAIG3-RFI-SW-C-9065 00 KAIG3-RFI-SW-C-9065-00
KAIG3-RFI-SW-C-9064 00 KAIG3-RFI-SW-C-9064-00
KAIG3-RFI-SW-C-9063 00 KAIG3-RFI-SW-C-9063-00
KAIG3-RFI-SW-C-9062 00 KAIG3-RFI-SW-C-9062-00
KAIG3-RFI-SW-C-9061 00 KAIG3-RFI-SW-C-9061-00
KAIG3-RFI-SW-C-9007 00 KAIG3-RFI-SW-C-9007-00
KAIG3-RFI-SW-LS-1747 00 KAIG3-RFI-SW-LS-1747-00
KAIG3-RFI-SW-C-9042 00 KAIG3-RFI-SW-C-9042-00
KAIG3-RFI-SW-C-9041 00 KAIG3-RFI-SW-C-9041-00
KAIG3-RFI-SW-C-9040 00 KAIG3-RFI-SW-C-9040-00
KAIG3-RFI-SW-C-9038 00 KAIG3-RFI-SW-C-9038-00
KAIG3-RFI-SW-C-9037 00 KAIG3-RFI-SW-C-9037-00
KAIG3-RFI-SW-C-9036 00 KAIG3-RFI-SW-C-9036-00
KAIG3-RFI-SW-C-9035 00 KAIG3-RFI-SW-C-9035-00
KAIG3-RFI-SW-C-9034 00 KAIG3-RFI-SW-C-9034-00
KAIG3-RFI-SW-C-9033 00 KAIG3-RFI-SW-C-9033-00
KAIG3-RFI-SW-C-9032 00 KAIG3-RFI-SW-C-9032-00
KAIG3-RFI-SW-C-9031 00 KAIG3-RFI-SW-C-9031-00
KAIG3-RFI-SW-C-9030 00 KAIG3-RFI-SW-C-9030-00
KAIG3-RFI-SW-C-9029 00 KAIG3-RFI-SW-C-9029-00
KAIG3-RFI-SW-C-9028 00 KAIG3-RFI-SW-C-9028-00
KAIG3-RFI-PA-C-9027 00 KAIG3-RFI-PA-C-9027-00
KAIG3-RFI-SW-C-9026 00 KAIG3-RFI-SW-C-9026-00
KAIG3-RFI-SW-C-9025 00 KAIG3-RFI-SW-C-9025-00
KAIG3-RFI-PA-C-9005 00 KAIG3-RFI-PA-C-9005-00
KAIG3-RFI-SW-C-9010 00 KAIG3-RFI-SW-C-9010-00
KAIG3-RFI-SW-C-9009 00 KAIG3-RFI-SW-C-9009-00
KAIG3-RFI-SW-C-9008 00 KAIG3-RFI-SW-C-9008-00
KAIG3-RFI-SW-C-8797 00 KAIG3-RFI-SW-C-8797-00
KAIG3-RFI-SW-C-9059 00 KAIG3-RFI-SW-C-9059-00
KAIG3-RFI-PA-C-9058 00 KAIG3-RFI-PA-C-9058-00
KAIG3-RFI-SW-C-9057 00 KAIG3-RFI-SW-C-9057-00
KAIG3-RFI-SW-C-9056 00 KAIG3-RFI-SW-C-9056-00
KAIG3-RFI-SW-C-9045 00 KAIG3-RFI-SW-C-9045-00
KAIG3-RFI-SW-C-9044 00 KAIG3-RFI-SW-C-9044-00
KAIG3-RFI-SW-C-9043 00 KAIG3-RFI-SW-C-9043-00
KAIG3-RFI-RD-C-7290 02 KAIG3-RFI-RD-C-7290-02
KAIG3-RFI-SW-C-8300 01 KAIG3-RFI-SW-C-8300-01
KAIG3-RFI-MC-S-10345 00 KAIG3-RFI-MC-S-10345-00
KAIG3-RFI-MC-S-10346 00 KAIG3-RFI-MC-S-10346-00
KAIG3-RFI-SM-S-10347 00 KAIG3-RFI-SM-S-10347-00
KAIG3-RFI-EC-S-10332 00 KAIG3-RFI-EC-S-10332-00
KAIG3-RFI-EC-S-10331 00 KAIG3-RFI-EC-S-10331-00
KAIG3-RFI-CO-S-10333 00 KAIG3-RFI-CO-S-10333-00
KAIG3-RFI-CO-S-10334 00 KAIG3-RFI-CO-S-10334-00
KAIG3-RFI-EC-S-10329 00 KAIG3-RFI-EC-S-10329-00
KAIG3-RFI-CO-S-10335 00 KAIG3-RFI-CO-S-10335-00
KAIG3-RFI-CO-S-10336 00 KAIG3-RFI-CO-S-10336-00
KAIG3-RFI-SM-S-10339 00 KAIG3-RFI-SM-S-10339-00
KAIG3-RFI-SM-S-10340 00 KAIG3-RFI-SM-S-10340-00
KAIG3-RFI-CO-S-10342 00 KAIG3-RFI-CO-S-10342-00
KAIG3-RFI-CO-S-10337 00 KAIG3-RFI-CO-S-10337-00
KAIG3-RFI-EC-S-10330 00 KAIG3-RFI-EC-S-10330-00
KAIG3-RFI-EC-S-10328 00 KAIG3-RFI-EC-S-10328-00
KAIG3-RFI-PC-E-0661 00 KAIG3-RFI-PC-E-0661-00
KAIG3-RFI-SW-E-0659 00 KAIG3-RFI-SW-E-0659-00
KAIG3-RFI-SW-E-0658 00 KAIG3-RFI-SW-E-0658-00
KAIG3-RFI-LM-E-0443 01 KAIG3-RFI-LM-E-0443-01
KAIG3-RFI-LM-LC-0888 01 KAIG3-RFI-LM-LC-0888-01
KAIG3-RFI-TT-A-1298 00 KAIG3-RFI-TT-A-1298-00
KAIG3-RFI-TT-A-1297 00 KAIG3-RFI-TT-A-1297-00
KAIG3-RFI-WG-C-9051 00 KAIG3-RFI-WG-C-9051-00
KAIG3-RFI-PG-C-9047 00 KAIG3-RFI-PG-C-9047-00
KAIG3-RFI-PG-C-9046 00 KAIG3-RFI-PG-C-9046-00
KAIG3-RFI-WG-SU-3315 00 KAIG3-RFI-WG-SU-3315-00
KAIG3-RFI-SW-LC-0891 00 KAIG3-RFI-SW-LC-0891-00
KAIG3-RFI-SW-LC-0890 00 KAIG3-RFI-SW-LC-0890-00
KAIG3-RFI-TG-C-9022 00 KAIG3-RFI-TG-C-9022-00
KAIG3-RFI-WG-C-9021 00 KAIG3-RFI-WG-C-9021-00
KAIG3-RFI-WG-C-9020 00 KAIG3-RFI-WG-C-9020-00
KAIG3-RFI-WG-C-9017 00 KAIG3-RFI-WG-C-9017-00
KAIG3-RFI-TB-S-10303 00 KAIG3-RFI-TB-S-10303-00
KAIG3-RFI-TB-SU-3313 00 KAIG3-RFI-TB-SU-3313-00
KAIG3-RFI-PG-LS-1746 00 KAIG3-RFI-PG-LS-1746-00
KAIG3-RFI-PG-LS-1745 00 KAIG3-RFI-PG-LS-1745-00
KAIG3-RFI-NA-S-10313 00 KAIG3-RFI-NA-S-10313-00
KAIG3-RFI-NA-S-10314 00 KAIG3-RFI-NA-S-10314-00
KAIG3-RFI-NA-S-10315 00 KAIG3-RFI-NA-S-10315-00
KAIG3-RFI-CO-S-10249 00 KAIG3-RFI-CO-S-10249-00
KAIG3-RFI-VG-S-10318 00 KAIG3-RFI-VG-S-10318-00
KAIG3-RFI-CC-S-10320 00 KAIG3-RFI-CC-S-10320-00
KAIG3-RFI-VG-S-10309 00 KAIG3-RFI-VG-S-10309-00
KAIG3-RFI-VG-S-10305 00 KAIG3-RFI-VG-S-10305-00
KAIG3-RFI-VG-S-10306 00 KAIG3-RFI-VG-S-10306-00
KAIG3-RFI-VG-S-10304 00 KAIG3-RFI-VG-S-10304-00
KAIG3-RFI-CO-S-10295 00 KAIG3-RFI-CO-S-10295-00
KAIG3-RFI-CO-S-10258 00 KAIG3-RFI-CO-S-10258-00
KAIG3-RFI-CO-S-10312 00 KAIG3-RFI-CO-S-10312-00
KAIG3-RFI-CO-S-10003 01 KAIG3-RFI-CO-S-10003-01
KAIG3-RFI-SW-M-0375 00 KAIG3-RFI-SW-M-0375-00
KAIG3-RFI-PA-C-9004 00 KAIG3-RFI-PA-C-9004-00
KAIG3-RFI-SW-C-9003 00 KAIG3-RFI-SW-C-9003-00
KAIG3-RFI-SW-C-9002 00 KAIG3-RFI-SW-C-9002-00
KAIG3-RFI-SW-C-9001 00 KAIG3-RFI-SW-C-9001-00
KAIG3-RFI-SW-C-9000 00 KAIG3-RFI-SW-C-9000-00
KAIG3-RFI-SW-C-8999 00 KAIG3-RFI-SW-C-8999-00
KAIG3-RFI-SW-C-8998 00 KAIG3-RFI-SW-C-8998-00
KAIG3-RFI-SW-C-8997 00 KAIG3-RFI-SW-C-8997-00
KAIG3-RFI-SW-C-8996 00 KAIG3-RFI-SW-C-8996-00
KAIG3-RFI-SW-C-8995 00 KAIG3-RFI-SW-C-8995-00
KAIG3-RFI-SW-C-8994 00 KAIG3-RFI-SW-C-8994-00
KAIG3-RFI-SW-C-8980 00 KAIG3-RFI-SW-C-8980-00
KAIG3-RFI-SW-C-8979 00 KAIG3-RFI-SW-C-8979-00
KAIG3-RFI-SW-C-8978 00 KAIG3-RFI-SW-C-8978-00
KAIG3-RFI-SW-C-8977 00 KAIG3-RFI-SW-C-8977-00
KAIG3-RFI-SW-C-8976 00 KAIG3-RFI-SW-C-8976-00
KAIG3-RFI-SW-C-8975 00 KAIG3-RFI-SW-C-8975-00
KAIG3-RFI-SW-C-8974 00 KAIG3-RFI-SW-C-8974-00
KAIG3-RFI-SW-C-8973 00 KAIG3-RFI-SW-C-8973-00
KAIG3-RFI-SW-C-8972 00 KAIG3-RFI-SW-C-8972-00
KAIG3-RFI-SW-C-8971 00 KAIG3-RFI-SW-C-8971-00
KAIG3-RFI-SW-C-8970 00 KAIG3-RFI-SW-C-8970-00
KAIG3-RFI-SW-C-8969 00 KAIG3-RFI-SW-C-8969-00
KAIG3-RFI-SW-C-8968 00 KAIG3-RFI-SW-C-8968-00
KAIG3-RFI-SW-C-8967 00 KAIG3-RFI-SW-C-8967-00
KAIG3-RFI-SW-C-8966 00 KAIG3-RFI-SW-C-8966-00
KAIG3-RFI-SW-C-8960 00 KAIG3-RFI-SW-C-8960-00
KAIG3-RFI-SW-C-8959 00 KAIG3-RFI-SW-C-8959-00
KAIG3-RFI-SW-C-8958 00 KAIG3-RFI-SW-C-8958-00
KAIG3-RFI-SW-C-8957 00 KAIG3-RFI-SW-C-8957-00
KAIG3-RFI-MC-C-09011 00 KAIG3-RFI-MC-C-09011-00
KAIG3-RFI-MC-C-09012 00 KAIG3-RFI-MC-C-09012-00
KAIG3-RFI-MC-C-09013 00 KAIG3-RFI-MC-C-09013-00
KAIG3-RFI-JG-C-09014 00 KAIG3-RFI-JG-C-09014-00
KAIG3-RFI-SW-LS-1736 00 KAIG3-RFI-SW-LS-1736-00
KAIG3-RFI-CO-C-09015 00 KAIG3-RFI-CO-C-09015-00
KAIG3-RFI-JG-C-09016 00 KAIG3-RFI-JG-C-09016-00
KAIG3-RFI-SM-A-1294 00 KAIG3-RFI-SM-A-1294-00
KAIG3-RFI-VG-SU-03314 00 KAIG3-RFI-VG-SU-03314-00
KAIG3-RFI-CO-SU-03311 00 KAIG3-RFI-CO-SU-03311-00
KAIG3-RFI-CO-SU-03312 00 KAIG3-RFI-CO-SU-03312-00
KAIG3-RFI-SW-C-9024 00 KAIG3-RFI-SW-C-9024-00
KAIG3-RFI-SW-C-9023 00 KAIG3-RFI-SW-C-9023-00
KAIG3-RFI-NA-S-10229 00 KAIG3-RFI-NA-S-10229-00
KAIG3-RFI-SW-C-8956 00 KAIG3-RFI-SW-C-8956-00
KAIG3-RFI-SW-C-8955 00 KAIG3-RFI-SW-C-8955-00
KAIG3-RFI-SW-C-8954 00 KAIG3-RFI-SW-C-8954-00
KAIG3-RFI-PA-C-8975 00 KAIG3-RFI-PA-C-8975-00
KAIG3-RFI-PG-S-10285 00 KAIG3-RFI-PG-S-10285-00
KAIG3-RFI-FC-A-1289 00 KAIG3-RFI-FC-A-1289-00
KAIG3-RFI-TT-A-1288 00 KAIG3-RFI-TT-A-1288-00
KAIG3-RFI-AG-A-1287 00 KAIG3-RFI-AG-A-1287-00
KAIG3-RFI-AG-A-1286 00 KAIG3-RFI-AG-A-1286-00
KAIG3-RFI-AG-A-1285 00 KAIG3-RFI-AG-A-1285-00
KAIG3-RFI-WG-SU-3307 00 KAIG3-RFI-WG-SU-3307-00
KAIG3-RFI-LM-LC-0893 00 KAIG3-RFI-LM-LC-0893-00
KAIG3-RFI-PC-LC-0892 00 KAIG3-RFI-PC-LC-0892-00
KAIG3-RFI-WG-C-8985 00 KAIG3-RFI-WG-C-8985-00
KAIG3-RFI-PG-C-8984 00 KAIG3-RFI-PG-C-8984-00
KAIG3-RFI-TG-C-8983 00 KAIG3-RFI-TG-C-8983-00
KAIG3-RFI-WG-C-8982 00 KAIG3-RFI-WG-C-8982-00
KAIG3-RFI-WG-C-8981 00 KAIG3-RFI-WG-C-8981-00
KAIG3-RFI-EC-S-10307 00 KAIG3-RFI-EC-S-10307-00
KAIG3-RFI-VG-S-10308 00 KAIG3-RFI-VG-S-10308-00
KAIG3-RFI-LM-S-10280 00 KAIG3-RFI-LM-S-10280-00
KAIG3-RFI-CO-S-10296 00 KAIG3-RFI-CO-S-10296-00
KAIG3-RFI-CO-S-10297 00 KAIG3-RFI-CO-S-10297-00
KAIG3-RFI-CO-S-10298 00 KAIG3-RFI-CO-S-10298-00
KAIG3-RFI-CO-S-10299 00 KAIG3-RFI-CO-S-10299-00
KAIG3-RFI-CO-S-10300 00 KAIG3-RFI-CO-S-10300-00
KAIG3-RFI-CO-SS-0438 00 KAIG3-RFI-CO-SS-0438-00
KAIG3-RFI-CO-A-1282 00 KAIG3-RFI-CO-A-1282-00
KAIG3-RFI-CO-A-1281 00 KAIG3-RFI-CO-A-1281-00
KAIG3-RFI-CO-A-1280 00 KAIG3-RFI-CO-A-1280-00
KAIG3-RFI-CO-A-1279 00 KAIG3-RFI-CO-A-1279-00
KAIG3-RFI-CO-A-1278 00 KAIG3-RFI-CO-A-1278-00
KAIG3-RFI-SM-S-10009 01 KAIG3-RFI-SM-S-10009-01
KAIG3-RFI-CO-C-08992 00 KAIG3-RFI-CO-C-08992-00
KAIG3-RFI-CC-C-08993 00 KAIG3-RFI-CC-C-08993-00
KAIG3-RFI-CO-C-08990 00 KAIG3-RFI-CO-C-08990-00
KAIG3-RFI-CO-C-08991 00 KAIG3-RFI-CO-C-08991-00
KAIG3-RFI-SM-A-1290 00 KAIG3-RFI-SM-A-1290-00
KAIG3-RFI-SM-A-1291 00 KAIG3-RFI-SM-A-1291-00
KAIG3-RFI-SM-A-1292 00 KAIG3-RFI-SM-A-1292-00
KAIG3-RFI-SM-A-1293 00 KAIG3-RFI-SM-A-1293-00
KAIG3-RFI-CO-SU-03310 00 KAIG3-RFI-CO-SU-03310-00
KAIG3-RFI-LM-SU-03306 00 KAIG3-RFI-LM-SU-03306-00
KAIG3-RFI-MC-SU-03309 00 KAIG3-RFI-MC-SU-03309-00
KAIG3-RFI-VG-SU-03305 00 KAIG3-RFI-VG-SU-03305-00
KAIG3-RFI-CO-S-10294 00 KAIG3-RFI-CO-S-10294-00
KAIG3-RFI-SM-S-10011 00 KAIG3-RFI-SM-S-10011-00
KAIG3-RFI-CO-S-10287 00 KAIG3-RFI-CO-S-10287-00
KAIG3-RFI-LM-S-10279 00 KAIG3-RFI-LM-S-10279-00
KAIG3-RFI-CO-S-10276 00 KAIG3-RFI-CO-S-10276-00
KAIG3-RFI-CO-S-10277 00 KAIG3-RFI-CO-S-10277-00
KAIG3-RFI-CO-S-10278 00 KAIG3-RFI-CO-S-10278-00
KAIG3-RFI-CO-S-10281 00 KAIG3-RFI-CO-S-10281-00
KAIG3-RFI-CO-S-10282 00 KAIG3-RFI-CO-S-10282-00
KAIG3-RFI-CO-S-10283 00 KAIG3-RFI-CO-S-10283-00
KAIG3-RFI-CO-S-10284 00 KAIG3-RFI-CO-S-10284-00
KAIG3-RFI-PC-S-10291 00 KAIG3-RFI-PC-S-10291-00
KAIG3-RFI-PC-S-10292 00 KAIG3-RFI-PC-S-10292-00
KAIG3-RFI-PC-S-10293 00 KAIG3-RFI-PC-S-10293-00
KAIG3-RFI-MC-S-10289 00 KAIG3-RFI-MC-S-10289-00
KAIG3-RFI-MC-S-10290 00 KAIG3-RFI-MC-S-10290-00
KAIG3-RFI-CO-S-10274 00 KAIG3-RFI-CO-S-10274-00
KAIG3-RFI-CO-S-10275 00 KAIG3-RFI-CO-S-10275-00
KAIG3-RFI-VG-S-10271 00 KAIG3-RFI-VG-S-10271-00
KAIG3-RFI-VG-S-10272 00 KAIG3-RFI-VG-S-10272-00
KAIG3-RFI-VG-S-10273 00 KAIG3-RFI-VG-S-10273-00
KAIG3-RFI-SW-M-0374 00 KAIG3-RFI-SW-M-0374-00
KAIG3-RFI-SW-C-8989 00 KAIG3-RFI-SW-C-8989-00
KAIG3-RFI-SW-C-8987 00 KAIG3-RFI-SW-C-8987-00
KAIG3-RFI-SW-C-8988 00 KAIG3-RFI-SW-C-8988-00
KAIG3-RFI-SW-C-8986 00 KAIG3-RFI-SW-C-8986-00
KAIG3-RFI-SW-LS-1744 00 KAIG3-RFI-SW-LS-1744-00
KAIG3-RFI-SW-C-8953 00 KAIG3-RFI-SW-C-8953-00
KAIG3-RFI-SW-C-8952 00 KAIG3-RFI-SW-C-8952-00
KAIG3-RFI-SW-C-8951 00 KAIG3-RFI-SW-C-8951-00
KAIG3-RFI-SW-C-8950 00 KAIG3-RFI-SW-C-8950-00
KAIG3-RFI-SW-C-8949 00 KAIG3-RFI-SW-C-8949-00
KAIG3-RFI-SW-C-8948 00 KAIG3-RFI-SW-C-8948-00
KAIG3-RFI-SW-C-8947 00 KAIG3-RFI-SW-C-8947-00
KAIG3-RFI-SW-C-8940 00 KAIG3-RFI-SW-C-8940-00
KAIG3-RFI-SW-C-8939 00 KAIG3-RFI-SW-C-8939-00
KAIG3-RFI-SW-C-8938 00 KAIG3-RFI-SW-C-8938-00
KAIG3-RFI-SW-C-8937 00 KAIG3-RFI-SW-C-8937-00
KAIG3-RFI-SW-C-8935 00 KAIG3-RFI-SW-C-8935-00
KAIG3-RFI-SW-C-8934 00 KAIG3-RFI-SW-C-8934-00
KAIG3-RFI-SW-C-8933 00 KAIG3-RFI-SW-C-8933-00
KAIG3-RFI-SW-C-8921 00 KAIG3-RFI-SW-C-8921-00
KAIG3-RFI-TT-E-0654 00 KAIG3-RFI-TT-E-0654-00
KAIG3-RFI-TT-E-0653 00 KAIG3-RFI-TT-E-0653-00
KAIG3-RFI-TT-LC-0884 00 KAIG3-RFI-TT-LC-0884-00
KAIG3-RFI-TT-LC-0881 00 KAIG3-RFI-TT-LC-0881-00
KAIG3-RFI-TT-LC-0880 00 KAIG3-RFI-TT-LC-0880-00
KAIG3-RFI-TT-LC-0879 00 KAIG3-RFI-TT-LC-0879-00
KAIG3-RFI-CG-LC-0889 00 KAIG3-RFI-CG-LC-0889-00
KAIG3-RFI-LM-LC-0888 00 KAIG3-RFI-LM-LC-0888-00
KAIG3-RFI-LM-LC-0887 00 KAIG3-RFI-LM-LC-0887-00
KAIG3-RFI-SW-E-0651 00 KAIG3-RFI-SW-E-0651-00
KAIG3-RFI-WG-E-0657 00 KAIG3-RFI-WG-E-0657-00
KAIG3-RFI-CF-E-0656 00 KAIG3-RFI-CF-E-0656-00
KAIG3-RFI-WG-E-0176 01 KAIG3-RFI-WG-E-0176-01
KAIG3-RFI-WG-LC-0886 00 KAIG3-RFI-WG-LC-0886-00
KAIG3-RFI-WG-LC-0885 00 KAIG3-RFI-WG-LC-0885-00
KAIG3-RFI-WG-LC-0878 00 KAIG3-RFI-WG-LC-0878-00
KAIG3-RFI-TB-E-0655 00 KAIG3-RFI-TB-E-0655-00
KAIG3-RFI-SW-C-8922 00 KAIG3-RFI-SW-C-8922-00
KAIG3-RFI-SW-C-8920 00 KAIG3-RFI-SW-C-8920-00
KAIG3-RFI-SW-C-8910 00 KAIG3-RFI-SW-C-8910-00
KAIG3-RFI-SW-C-8909 00 KAIG3-RFI-SW-C-8909-00
KAIG3-RFI-PA-C-8908 00 KAIG3-RFI-PA-C-8908-00
KAIG3-RFI-PA-C-8907 00 KAIG3-RFI-PA-C-8907-00
KAIG3-RFI-SW-C-8906 00 KAIG3-RFI-SW-C-8906-00
KAIG3-RFI-SW-C-8905 00 KAIG3-RFI-SW-C-8905-00
KAIG3-RFI-TG-LS-1690 01 KAIG3-RFI-TG-LS-1690-01
KAIG3-RFI-WG-S-10266 00 KAIG3-RFI-WG-S-10266-00
KAIG3-RFI-WG-S-10265 00 KAIG3-RFI-WG-S-10265-00
KAIG3-RFI-WG-C-8946 00 KAIG3-RFI-WG-C-8946-00
KAIG3-RFI-WG-C-8945 00 KAIG3-RFI-WG-C-8945-00
KAIG3-RFI-PG-C-8944 00 KAIG3-RFI-PG-C-8944-00
KAIG3-RFI-PG-C-8943 00 KAIG3-RFI-PG-C-8943-00
KAIG3-RFI-WG-C-8942 00 KAIG3-RFI-WG-C-8942-00
KAIG3-RFI-SW-A-1284 00 KAIG3-RFI-SW-A-1284-00
KAIG3-RFI-SW-A-1283 00 KAIG3-RFI-SW-A-1283-00
KAIG3-RFI-CO-S-10263 00 KAIG3-RFI-CO-S-10263-00
KAIG3-RFI-PG-C-8919 00 KAIG3-RFI-PG-C-8919-00
KAIG3-RFI-CO-S-10264 00 KAIG3-RFI-CO-S-10264-00
KAIG3-RFI-PG-C-8918 00 KAIG3-RFI-PG-C-8918-00
KAIG3-RFI-CO-S-10267 00 KAIG3-RFI-CO-S-10267-00
KAIG3-RFI-PG-C-8917 00 KAIG3-RFI-PG-C-8917-00
KAIG3-RFI-CO-S-10268 00 KAIG3-RFI-CO-S-10268-00
KAIG3-RFI-PG-C-8916 00 KAIG3-RFI-PG-C-8916-00
KAIG3-RFI-CO-S-10270 00 KAIG3-RFI-CO-S-10270-00
KAIG3-RFI-CO-S-10269 00 KAIG3-RFI-CO-S-10269-00
KAIG3-RFI-PG-LS-1743 00 KAIG3-RFI-PG-LS-1743-00
KAIG3-RFI-PG-LS-1742 00 KAIG3-RFI-PG-LS-1742-00
KAIG3-RFI-CO-SU-03301 00 KAIG3-RFI-CO-SU-03301-00
KAIG3-RFI-PG-LS-1741 00 KAIG3-RFI-PG-LS-1741-00
KAIG3-RFI-LM-SU-03299 00 KAIG3-RFI-LM-SU-03299-00
KAIG3-RFI-PG-LS-1740 00 KAIG3-RFI-PG-LS-1740-00
KAIG3-RFI-LG-C-08896 00 KAIG3-RFI-LG-C-08896-00
KAIG3-RFI-EC-C-08941 00 KAIG3-RFI-EC-C-08941-00
KAIG3-RFI-MC-C-08965 00 KAIG3-RFI-MC-C-08965-00
KAIG3-RFI-JG-C-08962 00 KAIG3-RFI-JG-C-08962-00
KAIG3-RFI-MC-C-08963 00 KAIG3-RFI-MC-C-08963-00
KAIG3-RFI-MC-C-08964 00 KAIG3-RFI-MC-C-08964-00
KAIG3-RFI-CO-C-08961 00 KAIG3-RFI-CO-C-08961-00
KAIG3-RFI-EC-C-08915 00 KAIG3-RFI-EC-C-08915-00
KAIG3-RFI-PG-LS-1650 01 KAIG3-RFI-PG-LS-1650-01
KAIG3-RFI-PG-LS-1649 01 KAIG3-RFI-PG-LS-1649-01
KAIG3-RFI-CO-S-7330 01 KAIG3-RFI-CO-S-7330-01
KAIG3-RFI-CO-S-7368 01 KAIG3-RFI-CO-S-7368-01
KAIG3-RFI-PC-S-8462 01 KAIG3-RFI-PC-S-8462-01
KAIG3-RFI-CO-S-9025 01 KAIG3-RFI-CO-S-9025-01
KAIG3-RFI-LM-S-9400 01 KAIG3-RFI-LM-S-9400-01
KAIG3-RFI-EC-SU-03265 00 KAIG3-RFI-EC-SU-03265-00
KAIG3-RFI-EC-S-10262 00 KAIG3-RFI-EC-S-10262-00
KAIG3-RFI-CO-S-10261 00 KAIG3-RFI-CO-S-10261-00
KAIG3-RFI-PC-P-0373 00 KAIG3-RFI-PC-P-0373-00
KAIG3-RFI-SW-M-0372 00 KAIG3-RFI-SW-M-0372-00
KAIG3-RFI-SM-S-10259 00 KAIG3-RFI-SM-S-10259-00
KAIG3-RFI-SW-M-0371 00 KAIG3-RFI-SW-M-0371-00
KAIG3-RFI-CO-S-10253 00 KAIG3-RFI-CO-S-10253-00
KAIG3-RFI-CO-S-10144 00 KAIG3-RFI-CO-S-10144-00
KAIG3-RFI-NA-S-10012 00 KAIG3-RFI-NA-S-10012-00
KAIG3-RFI-NA-S-10013 00 KAIG3-RFI-NA-S-10013-00
KAIG3-RFI-CO-S-10204 00 KAIG3-RFI-CO-S-10204-00
KAIG3-RFI-SW-C-8904 00 KAIG3-RFI-SW-C-8904-00
KAIG3-RFI-SW-C-8903 00 KAIG3-RFI-SW-C-8903-00
KAIG3-RFI-SW-C-8902 00 KAIG3-RFI-SW-C-8902-00
KAIG3-RFI-SW-C-8901 00 KAIG3-RFI-SW-C-8901-00
KAIG3-RFI-SW-C-8900 00 KAIG3-RFI-SW-C-8900-00
KAIG3-RFI-SW-C-8899 00 KAIG3-RFI-SW-C-8899-00
KAIG3-RFI-SW-C-8898 00 KAIG3-RFI-SW-C-8898-00
KAIG3-RFI-SW-C-8897 00 KAIG3-RFI-SW-C-8897-00
KAIG3-RFI-SW-C-8890 00 KAIG3-RFI-SW-C-8890-00
KAIG3-RFI-SW-C-8889 00 KAIG3-RFI-SW-C-8889-00
KAIG3-RFI-SW-C-8888 00 KAIG3-RFI-SW-C-8888-00
KAIG3-RFI-SW-C-8887 00 KAIG3-RFI-SW-C-8887-00
KAIG3-RFI-SW-C-8886 00 KAIG3-RFI-SW-C-8886-00
KAIG3-RFI-SW-C-8855 00 KAIG3-RFI-SW-C-8855-00
KAIG3-RFI-CO-C-08895 00 KAIG3-RFI-CO-C-08895-00
KAIG3-RFI-CO-C-08911 00 KAIG3-RFI-CO-C-08911-00
KAIG3-RFI-CO-C-08912 00 KAIG3-RFI-CO-C-08912-00
KAIG3-RFI-EC-C-08913 00 KAIG3-RFI-EC-C-08913-00
KAIG3-RFI-EC-C-08914 00 KAIG3-RFI-EC-C-08914-00
KAIG3-RFI-CO-A-1273 00 KAIG3-RFI-CO-A-1273-00
KAIG3-RFI-CO-SU-03303 00 KAIG3-RFI-CO-SU-03303-00
KAIG3-RFI-CO-A-1272 00 KAIG3-RFI-CO-A-1272-00
KAIG3-RFI-CO-SU-03304 00 KAIG3-RFI-CO-SU-03304-00
KAIG3-RFI-CO-A-1271 00 KAIG3-RFI-CO-A-1271-00
KAIG3-RFI-CC-SU-03300 00 KAIG3-RFI-CC-SU-03300-00
KAIG3-RFI-CO-SU-03295 00 KAIG3-RFI-CO-SU-03295-00
KAIG3-RFI-VG-SU-03298 00 KAIG3-RFI-VG-SU-03298-00
KAIG3-RFI-LM-S-10156 00 KAIG3-RFI-LM-S-10156-00
KAIG3-RFI-LM-S-10250 00 KAIG3-RFI-LM-S-10250-00
KAIG3-RFI-CC-S-10251 00 KAIG3-RFI-CC-S-10251-00
KAIG3-RFI-VG-S-10252 00 KAIG3-RFI-VG-S-10252-00
KAIG3-RFI-CO-S-10260 00 KAIG3-RFI-CO-S-10260-00
KAIG3-RFI-CO-S-10243 00 KAIG3-RFI-CO-S-10243-00
KAIG3-RFI-VG-S-10228 00 KAIG3-RFI-VG-S-10228-00
KAIG3-RFI-VG-S-10227 00 KAIG3-RFI-VG-S-10227-00
KAIG3-RFI-SW-C-8846 00 KAIG3-RFI-SW-C-8846-00
KAIG3-RFI-SW-C-8845 00 KAIG3-RFI-SW-C-8845-00
KAIG3-RFI-SW-C-8844 00 KAIG3-RFI-SW-C-8844-00
KAIG3-RFI-SW-C-8843 00 KAIG3-RFI-SW-C-8843-00
KAIG3-RFI-SW-C-8842 00 KAIG3-RFI-SW-C-8842-00
KAIG3-RFI-SW-C-8841 00 KAIG3-RFI-SW-C-8841-00
KAIG3-RFI-SW-C-8840 00 KAIG3-RFI-SW-C-8840-00
KAIG3-RFI-SW-C-8839 00 KAIG3-RFI-SW-C-8839-00
KAIG3-RFI-SW-C-8838 00 KAIG3-RFI-SW-C-8838-00
KAIG3-RFI-SW-C-8830 00 KAIG3-RFI-SW-C-8830-00
KAIG3-RFI-SW-C-8829 00 KAIG3-RFI-SW-C-8829-00
KAIG3-RFI-SW-C-8828 00 KAIG3-RFI-SW-C-8828-00
KAIG3-RFI-SW-C-8820 00 KAIG3-RFI-SW-C-8820-00
KAIG3-RFI-SW-C-8878 00 KAIG3-RFI-SW-C-8878-00
KAIG3-RFI-SW-LS-1734 00 KAIG3-RFI-SW-LS-1734-00
KAIG3-RFI-SW-C-8827 00 KAIG3-RFI-SW-C-8827-00
KAIG3-RFI-SW-C-8826 00 KAIG3-RFI-SW-C-8826-00
KAIG3-RFI-SW-C-8825 00 KAIG3-RFI-SW-C-8825-00
KAIG3-RFI-SW-C-8824 00 KAIG3-RFI-SW-C-8824-00
KAIG3-RFI-SW-C-8823 00 KAIG3-RFI-SW-C-8823-00
KAIG3-RFI-SW-C-8822 00 KAIG3-RFI-SW-C-8822-00
KAIG3-RFI-SW-C-8821 00 KAIG3-RFI-SW-C-8821-00
KAIG3-RFI-SW-C-8819 00 KAIG3-RFI-SW-C-8819-00
KAIG3-RFI-SW-C-8818 00 KAIG3-RFI-SW-C-8818-00
KAIG3-RFI-SW-C-8817 00 KAIG3-RFI-SW-C-8817-00
KAIG3-RFI-SW-C-8816 00 KAIG3-RFI-SW-C-8816-00
KAIG3-RFI-SW-C-8815 00 KAIG3-RFI-SW-C-8815-00
KAIG3-RFI-SW-C-8814 00 KAIG3-RFI-SW-C-8814-00
KAIG3-RFI-SW-C-8813 00 KAIG3-RFI-SW-C-8813-00
KAIG3-RFI-SW-C-8812 00 KAIG3-RFI-SW-C-8812-00
KAIG3-RFI-SW-C-8811 00 KAIG3-RFI-SW-C-8811-00
KAIG3-RFI-SW-C-8810 00 KAIG3-RFI-SW-C-8810-00
KAIG3-RFI-SW-C-8800 00 KAIG3-RFI-SW-C-8800-00
KAIG3-RFI-SW-C-8766 00 KAIG3-RFI-SW-C-8766-00
KAIG3-RFI-SW-LS-1738 00 KAIG3-RFI-SW-LS-1738-00
KAIG3-RFI-SW-C-8885 00 KAIG3-RFI-SW-C-8885-00
KAIG3-RFI-SW-C-8884 00 KAIG3-RFI-SW-C-8884-00
KAIG3-RFI-SW-C-8883 00 KAIG3-RFI-SW-C-8883-00
KAIG3-RFI-SW-C-8882 00 KAIG3-RFI-SW-C-8882-00
KAIG3-RFI-SW-C-8881 00 KAIG3-RFI-SW-C-8881-00
KAIG3-RFI-SW-C-8880 00 KAIG3-RFI-SW-C-8880-00
KAIG3-RFI-SW-C-8879 00 KAIG3-RFI-SW-C-8879-00
KAIG3-RFI-SW-C-8877 00 KAIG3-RFI-SW-C-8877-00
KAIG3-RFI-SW-C-8860 00 KAIG3-RFI-SW-C-8860-00
KAIG3-RFI-SW-C-8859 00 KAIG3-RFI-SW-C-8859-00
KAIG3-RFI-SW-C-8858 00 KAIG3-RFI-SW-C-8858-00
KAIG3-RFI-SW-C-8857 00 KAIG3-RFI-SW-C-8857-00
KAIG3-RFI-SW-C-8856 00 KAIG3-RFI-SW-C-8856-00
KAIG3-RFI-SW-C-8854 00 KAIG3-RFI-SW-C-8854-00
KAIG3-RFI-SW-C-8853 00 KAIG3-RFI-SW-C-8853-00
KAIG3-RFI-SW-C-8852 00 KAIG3-RFI-SW-C-8852-00
KAIG3-RFI-SW-C-8851 00 KAIG3-RFI-SW-C-8851-00
KAIG3-RFI-SW-C-8850 00 KAIG3-RFI-SW-C-8850-00
KAIG3-RFI-SW-C-8849 00 KAIG3-RFI-SW-C-8849-00
KAIG3-RFI-SW-C-8847 00 KAIG3-RFI-SW-C-8847-00
KAIG3-RFI-CF-LC-0883 00 KAIG3-RFI-CF-LC-0883-00
KAIG3-RFI-CF-LC-0882 00 KAIG3-RFI-CF-LC-0882-00
KAIG3-RFI-WG-LS-1739 00 KAIG3-RFI-WG-LS-1739-00
KAIG3-RFI-PG-C-8894 00 KAIG3-RFI-PG-C-8894-00
KAIG3-RFI-PG-C-8893 00 KAIG3-RFI-PG-C-8893-00
KAIG3-RFI-WG-C-8892 00 KAIG3-RFI-WG-C-8892-00
KAIG3-RFI-WG-C-8891 00 KAIG3-RFI-WG-C-8891-00
KAIG3-RFI-PG-C-8870 00 KAIG3-RFI-PG-C-8870-00
KAIG3-RFI-PG-C-8868 00 KAIG3-RFI-PG-C-8868-00
KAIG3-RFI-CO-S-10202 00 KAIG3-RFI-CO-S-10202-00
KAIG3-RFI-CO-S-7213 01 KAIG3-RFI-CO-S-7213-01
KAIG3-RFI-CO-S-7265 01 KAIG3-RFI-CO-S-7265-01
KAIG3-RFI-CO-S-7001 01 KAIG3-RFI-CO-S-7001-01
KAIG3-RFI-CO-S-7150 01 KAIG3-RFI-CO-S-7150-01
KAIG3-RFI-CO-S-6853 01 KAIG3-RFI-CO-S-6853-01
KAIG3-RFI-CO-S-6772 01 KAIG3-RFI-CO-S-6772-01
KAIG3-RFI-CO-S-6774 01 KAIG3-RFI-CO-S-6774-01
KAIG3-RFI-CO-S-6787 01 KAIG3-RFI-CO-S-6787-01
KAIG3-RFI-JG-C-08876 00 KAIG3-RFI-JG-C-08876-00
KAIG3-RFI-CO-C-08671 01 KAIG3-RFI-CO-C-08671-01
KAIG3-RFI-CO-SU-03297 00 KAIG3-RFI-CO-SU-03297-00
KAIG3-RFI-CO-SU-03292 00 KAIG3-RFI-CO-SU-03292-00
KAIG3-RFI-CO-SS-0452 00 KAIG3-RFI-CO-SS-0452-00
KAIG3-RFI-CO-S-6789 01 KAIG3-RFI-CO-S-6789-01
KAIG3-RFI-CO-S-6845 01 KAIG3-RFI-CO-S-6845-01
KAIG3-RFI-CO-S-6851 01 KAIG3-RFI-CO-S-6851-01
KAIG3-RFI-CO-S-6645 01 KAIG3-RFI-CO-S-6645-01
KAIG3-RFI-NA-S-10152 00 KAIG3-RFI-NA-S-10152-00
KAIG3-RFI-CO-S-10248 00 KAIG3-RFI-CO-S-10248-00
KAIG3-RFI-CO-A-01277 00 KAIG3-RFI-CO-A-01277-00
KAIG3-RFI-CO-A-01276 00 KAIG3-RFI-CO-A-01276-00
KAIG3-RFI-CO-S-10245 00 KAIG3-RFI-CO-S-10245-00
KAIG3-RFI-VG-S-10239 00 KAIG3-RFI-VG-S-10239-00
KAIG3-RFI-VG-S-10237 00 KAIG3-RFI-VG-S-10237-00
KAIG3-RFI-VG-S-10238 00 KAIG3-RFI-VG-S-10238-00
KAIG3-RFI-CO-S-10225 00 KAIG3-RFI-CO-S-10225-00
KAIG3-RFI-CO-S-10226 00 KAIG3-RFI-CO-S-10226-00
KAIG3-RFI-CO-S-10240 00 KAIG3-RFI-CO-S-10240-00
KAIG3-RFI-CO-S-10241 00 KAIG3-RFI-CO-S-10241-00
KAIG3-RFI-CO-S-10242 00 KAIG3-RFI-CO-S-10242-00
KAIG3-RFI-CO-C-08874 00 KAIG3-RFI-CO-C-08874-00
KAIG3-RFI-MC-C-08873 00 KAIG3-RFI-MC-C-08873-00
KAIG3-RFI-MC-C-08872 00 KAIG3-RFI-MC-C-08872-00
KAIG3-RFI-EC-C-08787 00 KAIG3-RFI-EC-C-08787-00
KAIG3-RFI-CG-C-08837 00 KAIG3-RFI-CG-C-08837-00
KAIG3-RFI-EC-C-08836 00 KAIG3-RFI-EC-C-08836-00
KAIG3-RFI-CO-C-08832 00 KAIG3-RFI-CO-C-08832-00
KAIG3-RFI-CO-S-10233 00 KAIG3-RFI-CO-S-10233-00
KAIG3-RFI-CO-S-10234 00 KAIG3-RFI-CO-S-10234-00
KAIG3-RFI-CO-S-8340 02 KAIG3-RFI-CO-S-8340-02
KAIG3-RFI-CO-S-6417 01 KAIG3-RFI-CO-S-6417-01
KAIG3-RFI-CO-S-6555 01 KAIG3-RFI-CO-S-6555-01
KAIG3-RFI-CO-S-6562 01 KAIG3-RFI-CO-S-6562-01
KAIG3-RFI-CO-S-6611 01 KAIG3-RFI-CO-S-6611-01
KAIG3-RFI-CO-S-6643 01 KAIG3-RFI-CO-S-6643-01
KAIG3-RFI-CO-S-10210 00 KAIG3-RFI-CO-S-10210-00
KAIG3-RFI-CO-S-10208 00 KAIG3-RFI-CO-S-10208-00
KAIG3-RFI-CO-S-10209 00 KAIG3-RFI-CO-S-10209-00
KAIG3-RFI-NA-S-10230 00 KAIG3-RFI-NA-S-10230-00
KAIG3-RFI-EC-SU-03294 00 KAIG3-RFI-EC-SU-03294-00
KAIG3-RFI-EC-SU-03293 00 KAIG3-RFI-EC-SU-03293-00
KAIG3-RFI-NA-SU-03291 00 KAIG3-RFI-NA-SU-03291-00
KAIG3-RFI-EC-S-10236 00 KAIG3-RFI-EC-S-10236-00
KAIG3-RFI-MC-S-10173 00 KAIG3-RFI-MC-S-10173-00
KAIG3-RFI-EC-S-10235 00 KAIG3-RFI-EC-S-10235-00
KAIG3-RFI-CO-S-10232 00 KAIG3-RFI-CO-S-10232-00
KAIG3-RFI-CO-S-10213 00 KAIG3-RFI-CO-S-10213-00
KAIG3-RFI-CO-S-10165 00 KAIG3-RFI-CO-S-10165-00
KAIG3-RFI-CO-S-10166 00 KAIG3-RFI-CO-S-10166-00
KAIG3-RFI-CO-S-10167 00 KAIG3-RFI-CO-S-10167-00
KAIG3-RFI-MC-S-10171 00 KAIG3-RFI-MC-S-10171-00
KAIG3-RFI-MC-S-10172 00 KAIG3-RFI-MC-S-10172-00
KAIG3-RFI-MC-S-10168 00 KAIG3-RFI-MC-S-10168-00
KAIG3-RFI-MC-S-10169 00 KAIG3-RFI-MC-S-10169-00
KAIG3-RFI-MC-S-10170 00 KAIG3-RFI-MC-S-10170-00
KAIG3-RFI-LM-S-10215 00 KAIG3-RFI-LM-S-10215-00
KAIG3-RFI-LM-S-10216 00 KAIG3-RFI-LM-S-10216-00
KAIG3-RFI-CO-S-10214 00 KAIG3-RFI-CO-S-10214-00
KAIG3-RFI-WG-LS-1737 00 KAIG3-RFI-WG-LS-1737-00
KAIG3-RFI-PG-S-10218 00 KAIG3-RFI-PG-S-10218-00
KAIG3-RFI-PG-C-8869 00 KAIG3-RFI-PG-C-8869-00
KAIG3-RFI-PG-C-8867 00 KAIG3-RFI-PG-C-8867-00
KAIG3-RFI-WG-C-8866 00 KAIG3-RFI-WG-C-8866-00
KAIG3-RFI-WG-C-8865 00 KAIG3-RFI-WG-C-8865-00
KAIG3-RFI-TG-C-8864 00 KAIG3-RFI-TG-C-8864-00
KAIG3-RFI-TG-C-8863 00 KAIG3-RFI-TG-C-8863-00
KAIG3-RFI-TG-C-8862 00 KAIG3-RFI-TG-C-8862-00
KAIG3-RFI-TG-C-8861 00 KAIG3-RFI-TG-C-8861-00
KAIG3-RFI-SW-LS-1731 00 KAIG3-RFI-SW-LS-1731-00
KAIG3-RFI-SW-C-8799 00 KAIG3-RFI-SW-C-8799-00
KAIG3-RFI-SW-C-8798 00 KAIG3-RFI-SW-C-8798-00
KAIG3-RFI-SW-C-8796 00 KAIG3-RFI-SW-C-8796-00
KAIG3-RFI-SW-C-8795 00 KAIG3-RFI-SW-C-8795-00
KAIG3-RFI-SW-C-8794 00 KAIG3-RFI-SW-C-8794-00
KAIG3-RFI-SW-C-8793 00 KAIG3-RFI-SW-C-8793-00
KAIG3-RFI-SW-C-8792 00 KAIG3-RFI-SW-C-8792-00
KAIG3-RFI-SW-C-8791 00 KAIG3-RFI-SW-C-8791-00
KAIG3-RFI-SW-C-8790 00 KAIG3-RFI-SW-C-8790-00
KAIG3-RFI-SW-C-8789 00 KAIG3-RFI-SW-C-8789-00
KAIG3-RFI-SW-C-8785 00 KAIG3-RFI-SW-C-8785-00
KAIG3-RFI-SW-C-8784 00 KAIG3-RFI-SW-C-8784-00
KAIG3-RFI-SW-C-8783 00 KAIG3-RFI-SW-C-8783-00
KAIG3-RFI-SW-C-8782 00 KAIG3-RFI-SW-C-8782-00
KAIG3-RFI-SW-C-8781 00 KAIG3-RFI-SW-C-8781-00
KAIG3-RFI-SW-C-8780 00 KAIG3-RFI-SW-C-8780-00
KAIG3-RFI-SW-C-8779 00 KAIG3-RFI-SW-C-8779-00
KAIG3-RFI-SW-C-8778 00 KAIG3-RFI-SW-C-8778-00
KAIG3-RFI-SW-C-8777 00 KAIG3-RFI-SW-C-8777-00
KAIG3-RFI-SW-C-8776 00 KAIG3-RFI-SW-C-8776-00
KAIG3-RFI-WG-LS-1735 00 KAIG3-RFI-WG-LS-1735-00
KAIG3-RFI-WG-C-8871 00 KAIG3-RFI-WG-C-8871-00
KAIG3-RFI-SW-M-0370 00 KAIG3-RFI-SW-M-0370-00
KAIG3-RFI-SW-M-0369 00 KAIG3-RFI-SW-M-0369-00
KAIG3-RFI-CC-C-08707 01 KAIG3-RFI-CC-C-08707-01
KAIG3-RFI-FC-A-1275 00 KAIG3-RFI-FC-A-1275-00
KAIG3-RFI-TT-A-1274 00 KAIG3-RFI-TT-A-1274-00
KAIG3-RFI-WG-C-8835 00 KAIG3-RFI-WG-C-8835-00
KAIG3-RFI-WG-C-8834 00 KAIG3-RFI-WG-C-8834-00
KAIG3-RFI-WG-C-8833 00 KAIG3-RFI-WG-C-8833-00
KAIG3-RFI-TB-S-10217 00 KAIG3-RFI-TB-S-10217-00
KAIG3-RFI-AG-S-10203 00 KAIG3-RFI-AG-S-10203-00
KAIG3-RFI-WG-LS-1733 00 KAIG3-RFI-WG-LS-1733-00
KAIG3-RFI-WG-E-00650 00 KAIG3-RFI-WG-E-00650-00
KAIG3-RFI-WG-E-00649 00 KAIG3-RFI-WG-E-00649-00
KAIG3-RFI-BO-E-0507 03 KAIG3-RFI-BO-E-0507-03
KAIG3-RFI-WG-LC-0877 00 KAIG3-RFI-WG-LC-0877-00
KAIG3-RFI-WG-LC-0876 00 KAIG3-RFI-WG-LC-0876-00
KAIG3-RFI-CO-A-1239 01 KAIG3-RFI-CO-A-1239-01
KAIG3-RFI-CO-A-1239 00 KAIG3-RFI-CO-A-1239-00
KAIG3-RFI-SW-LS-1730 00 KAIG3-RFI-SW-LS-1730-00
KAIG3-RFI-SW-C-8775 00 KAIG3-RFI-SW-C-8775-00
KAIG3-RFI-SW-C-8774 00 KAIG3-RFI-SW-C-8774-00
KAIG3-RFI-SW-C-8770 00 KAIG3-RFI-SW-C-8770-00
KAIG3-RFI-SW-C-8769 00 KAIG3-RFI-SW-C-8769-00
KAIG3-RFI-SW-C-8768 00 KAIG3-RFI-SW-C-8768-00
KAIG3-RFI-SW-C-8767 00 KAIG3-RFI-SW-C-8767-00
KAIG3-RFI-SW-C-8765 00 KAIG3-RFI-SW-C-8765-00
KAIG3-RFI-SW-C-8764 00 KAIG3-RFI-SW-C-8764-00
KAIG3-RFI-SW-C-8763 00 KAIG3-RFI-SW-C-8763-00
KAIG3-RFI-SW-C-8762 00 KAIG3-RFI-SW-C-8762-00
KAIG3-RFI-SW-C-8761 00 KAIG3-RFI-SW-C-8761-00
KAIG3-RFI-SW-C-8760 00 KAIG3-RFI-SW-C-8760-00
KAIG3-RFI-SW-C-8759 00 KAIG3-RFI-SW-C-8759-00
KAIG3-RFI-SW-C-8745 00 KAIG3-RFI-SW-C-8745-00
KAIG3-RFI-WG-LS-1732 00 KAIG3-RFI-WG-LS-1732-00
KAIG3-RFI-PC-P-0368 00 KAIG3-RFI-PC-P-0368-00
KAIG3-RFI-PC-P-0367 00 KAIG3-RFI-PC-P-0367-00
KAIG3-RFI-LM-A-01269 00 KAIG3-RFI-LM-A-01269-00
KAIG3-RFI-LM-A-01270 00 KAIG3-RFI-LM-A-01270-00
KAIG3-RFI-LM-A-01268 00 KAIG3-RFI-LM-A-01268-00
KAIG3-RFI-CC-C-08831 00 KAIG3-RFI-CC-C-08831-00
KAIG3-RFI-MC-C-6339 01 KAIG3-RFI-MC-C-6339-01
KAIG3-RFI-PC-C-8808 00 KAIG3-RFI-PC-C-8808-00
KAIG3-RFI-SW-C-8806 00 KAIG3-RFI-SW-C-8806-00
KAIG3-RFI-CO-C-6259 01 KAIG3-RFI-CO-C-6259-01
KAIG3-RFI-CO-C-6336 01 KAIG3-RFI-CO-C-6336-01
KAIG3-RFI-CO-C-6337 01 KAIG3-RFI-CO-C-6337-01
KAIG3-RFI-PC-C-8809 00 KAIG3-RFI-PC-C-8809-00
KAIG3-RFI-CO-C-6338 01 KAIG3-RFI-CO-C-6338-01
KAIG3-RFI-SW-C-8807 00 KAIG3-RFI-SW-C-8807-00
KAIG3-RFI-MC-C-6340 01 KAIG3-RFI-MC-C-6340-01
KAIG3-RFI-MC-C-6341 01 KAIG3-RFI-MC-C-6341-01
KAIG3-RFI-CO-C-08670 00 KAIG3-RFI-CO-C-08670-00
KAIG3-RFI-CC-S-10205 00 KAIG3-RFI-CC-S-10205-00
KAIG3-RFI-CO-S-10206 00 KAIG3-RFI-CO-S-10206-00
KAIG3-RFI-CO-S-10207 00 KAIG3-RFI-CO-S-10207-00
KAIG3-RFI-CO-S-10211 00 KAIG3-RFI-CO-S-10211-00
KAIG3-RFI-CO-S-10212 00 KAIG3-RFI-CO-S-10212-00
KAIG3-RFI-CO-S-10106 00 KAIG3-RFI-CO-S-10106-00
KAIG3-RFI-CO-S-10196 00 KAIG3-RFI-CO-S-10196-00
KAIG3-RFI-CO-S-10197 00 KAIG3-RFI-CO-S-10197-00
KAIG3-RFI-CO-S-10198 00 KAIG3-RFI-CO-S-10198-00
KAIG3-RFI-CO-S-10201 00 KAIG3-RFI-CO-S-10201-00
KAIG3-RFI-CO-SU-03289 00 KAIG3-RFI-CO-SU-03289-00
KAIG3-RFI-CO-SU-03299 00 KAIG3-RFI-CO-SU-03299-00
KAIG3-RFI-CO-SU-03288 00 KAIG3-RFI-CO-SU-03288-00
KAIG3-RFI-PG-C-8805 00 KAIG3-RFI-PG-C-8805-00
KAIG3-RFI-PG-C-8804 00 KAIG3-RFI-PG-C-8804-00
KAIG3-RFI-AG-SU-3284 00 KAIG3-RFI-AG-SU-3284-00
KAIG3-RFI-AG-A-1267 00 KAIG3-RFI-AG-A-1267-00
KAIG3-RFI-AG-A-1266 00 KAIG3-RFI-AG-A-1266-00
KAIG3-RFI-AG-A-1265 00 KAIG3-RFI-AG-A-1265-00
KAIG3-RFI-TT-A-1264 00 KAIG3-RFI-TT-A-1264-00
KAIG3-RFI-FC-A-1249 00 KAIG3-RFI-FC-A-1249-00
KAIG3-RFI-WG-S-10188 00 KAIG3-RFI-WG-S-10188-00
KAIG3-RFI-WG-S-10187 00 KAIG3-RFI-WG-S-10187-00
KAIG3-RFI-WG-S-10186 00 KAIG3-RFI-WG-S-10186-00
KAIG3-RFI-WG-S-10185 00 KAIG3-RFI-WG-S-10185-00
KAIG3-RFI-TG-S-10178 00 KAIG3-RFI-TG-S-10178-00
KAIG3-RFI-LM-E-00646 00 KAIG3-RFI-LM-E-00646-00
KAIG3-RFI-SW-E-00648 00 KAIG3-RFI-SW-E-00648-00
KAIG3-RFI-SW-E-00640 01 KAIG3-RFI-SW-E-00640-01
KAIG3-RFI-SW-E-0608 00 KAIG3-RFI-SW-E-0608-00
KAIG3-RFI-MC-C-08801 00 KAIG3-RFI-MC-C-08801-00
KAIG3-RFI-CO-C-08803 00 KAIG3-RFI-CO-C-08803-00
KAIG3-RFI-MC-C-08802 00 KAIG3-RFI-MC-C-08802-00
KAIG3-RFI-EC-C-08786 00 KAIG3-RFI-EC-C-08786-00
KAIG3-RFI-EC-C-08788 00 KAIG3-RFI-EC-C-08788-00
KAIG3-RFI-PG-C-8773 00 KAIG3-RFI-PG-C-8773-00
KAIG3-RFI-CO-S-10183 00 KAIG3-RFI-CO-S-10183-00
KAIG3-RFI-PG-C-8772 00 KAIG3-RFI-PG-C-8772-00
KAIG3-RFI-CO-S-10184 00 KAIG3-RFI-CO-S-10184-00
KAIG3-RFI-CO-S-10189 00 KAIG3-RFI-CO-S-10189-00
KAIG3-RFI-TG-SU-3282 00 KAIG3-RFI-TG-SU-3282-00
KAIG3-RFI-CO-S-10190 00 KAIG3-RFI-CO-S-10190-00
KAIG3-RFI-TG-S-10162 00 KAIG3-RFI-TG-S-10162-00
KAIG3-RFI-WG-S-10149 00 KAIG3-RFI-WG-S-10149-00
KAIG3-RFI-CO-S-10191 00 KAIG3-RFI-CO-S-10191-00
KAIG3-RFI-MC-S-10179 00 KAIG3-RFI-MC-S-10179-00
KAIG3-RFI-WG-S-10148 00 KAIG3-RFI-WG-S-10148-00
KAIG3-RFI-MC-S-10180 00 KAIG3-RFI-MC-S-10180-00
KAIG3-RFI-MC-S-10181 00 KAIG3-RFI-MC-S-10181-00
KAIG3-RFI-CO-S-10192 00 KAIG3-RFI-CO-S-10192-00
KAIG3-RFI-CO-S-10175 00 KAIG3-RFI-CO-S-10175-00
KAIG3-RFI-CO-S-10176 00 KAIG3-RFI-CO-S-10176-00
KAIG3-RFI-CO-S-10177 00 KAIG3-RFI-CO-S-10177-00
KAIG3-RFI-EC-S-10182 00 KAIG3-RFI-EC-S-10182-00
KAIG3-RFI-CO-S-10174 00 KAIG3-RFI-CO-S-10174-00
KAIG3-RFI-MC-S-10033 00 KAIG3-RFI-MC-S-10033-00
KAIG3-RFI-SW-M-0366 00 KAIG3-RFI-SW-M-0366-00
KAIG3-RFI-SW-M-0365 00 KAIG3-RFI-SW-M-0365-00
KAIG3-RFI-SW-C-8758 00 KAIG3-RFI-SW-C-8758-00
KAIG3-RFI-SW-C-8757 00 KAIG3-RFI-SW-C-8757-00
KAIG3-RFI-SW-C-8756 00 KAIG3-RFI-SW-C-8756-00
KAIG3-RFI-SW-C-8755 00 KAIG3-RFI-SW-C-8755-00
KAIG3-RFI-SW-C-8754 00 KAIG3-RFI-SW-C-8754-00
KAIG3-RFI-PG-E-0647 00 KAIG3-RFI-PG-E-0647-00
KAIG3-RFI-NA-SU-03287 00 KAIG3-RFI-NA-SU-03287-00
KAIG3-RFI-MB-E-0644 00 KAIG3-RFI-MB-E-0644-00
KAIG3-RFI-MC-SU-03285 00 KAIG3-RFI-MC-SU-03285-00
KAIG3-RFI-MB-E-0642 00 KAIG3-RFI-MB-E-0642-00
KAIG3-RFI-EC-SU-03286 00 KAIG3-RFI-EC-SU-03286-00
KAIG3-RFI-MB-LC-0874 00 KAIG3-RFI-MB-LC-0874-00
KAIG3-RFI-MB-LC-0873 00 KAIG3-RFI-MB-LC-0873-00
KAIG3-RFI-MC-SU-03269 00 KAIG3-RFI-MC-SU-03269-00
KAIG3-RFI-FC-LC-0053 01 KAIG3-RFI-FC-LC-0053-01
KAIG3-RFI-DG-E-0645 00 KAIG3-RFI-DG-E-0645-00
KAIG3-RFI-CO-A-1259 00 KAIG3-RFI-CO-A-1259-00
KAIG3-RFI-CO-A-1260 00 KAIG3-RFI-CO-A-1260-00
KAIG3-RFI-CO-A-1261 00 KAIG3-RFI-CO-A-1261-00
KAIG3-RFI-CO-A-1262 00 KAIG3-RFI-CO-A-1262-00
KAIG3-RFI-CO-S-7990 01 KAIG3-RFI-CO-S-7990-01
KAIG3-RFI-CO-S-7992 01 KAIG3-RFI-CO-S-7992-01
KAIG3-RFI-VG-S-10138 00 KAIG3-RFI-VG-S-10138-00
KAIG3-RFI-VG-S-10157 00 KAIG3-RFI-VG-S-10157-00
KAIG3-RFI-VG-S-10158 00 KAIG3-RFI-VG-S-10158-00
KAIG3-RFI-MC-S-10159 00 KAIG3-RFI-MC-S-10159-00
KAIG3-RFI-MC-S-10160 00 KAIG3-RFI-MC-S-10160-00
KAIG3-RFI-MC-S-10161 00 KAIG3-RFI-MC-S-10161-00
KAIG3-RFI-NA-S-10150 00 KAIG3-RFI-NA-S-10150-00
KAIG3-RFI-NA-S-10151 00 KAIG3-RFI-NA-S-10151-00
KAIG3-RFI-CO-S-10153 00 KAIG3-RFI-CO-S-10153-00
KAIG3-RFI-CO-S-10154 00 KAIG3-RFI-CO-S-10154-00
KAIG3-RFI-LM-S-10155 00 KAIG3-RFI-LM-S-10155-00
KAIG3-RFI-CO-S-10145 00 KAIG3-RFI-CO-S-10145-00
KAIG3-RFI-CO-S-10147 00 KAIG3-RFI-CO-S-10147-00
KAIG3-RFI-CO-S-10146 00 KAIG3-RFI-CO-S-10146-00
KAIG3-RFI-CO-S-10142 00 KAIG3-RFI-CO-S-10142-00
KAIG3-RFI-EC-S-10139 00 KAIG3-RFI-EC-S-10139-00
KAIG3-RFI-CO-S-10143 00 KAIG3-RFI-CO-S-10143-00
KAIG3-RFI-VG-S-10137 00 KAIG3-RFI-VG-S-10137-00
KAIG3-RFI-LM-S-10068 00 KAIG3-RFI-LM-S-10068-00
KAIG3-RFI-SW-LS-1729 00 KAIG3-RFI-SW-LS-1729-00
KAIG3-RFI-SW-LS-1728 00 KAIG3-RFI-SW-LS-1728-00
KAIG3-RFI-SW-LS-1727 00 KAIG3-RFI-SW-LS-1727-00
KAIG3-RFI-WG-LS-1726 00 KAIG3-RFI-WG-LS-1726-00
KAIG3-RFI-WG-C-8735 00 KAIG3-RFI-WG-C-8735-00
KAIG3-RFI-EC-S-10132 00 KAIG3-RFI-EC-S-10132-00
KAIG3-RFI-CO-C-08771 00 KAIG3-RFI-CO-C-08771-00
KAIG3-RFI-MC-C-08753 00 KAIG3-RFI-MC-C-08753-00
KAIG3-RFI-EC-C-08733 00 KAIG3-RFI-EC-C-08733-00
KAIG3-RFI-VG-C-08729 00 KAIG3-RFI-VG-C-08729-00
KAIG3-RFI-CO-C-08730 00 KAIG3-RFI-CO-C-08730-00
KAIG3-RFI-JG-C-08732 00 KAIG3-RFI-JG-C-08732-00
KAIG3-RFI-EC-C-08734 00 KAIG3-RFI-EC-C-08734-00
KAIG3-RFI-MC-C-08731 00 KAIG3-RFI-MC-C-08731-00
KAIG3-RFI-LM-P-00363 00 KAIG3-RFI-LM-P-00363-00
KAIG3-RFI-SW-C-08725 00 KAIG3-RFI-SW-C-08725-00
KAIG3-RFI-SW-C-08724 00 KAIG3-RFI-SW-C-08724-00
KAIG3-RFI-SW-C-08723 00 KAIG3-RFI-SW-C-08723-00
KAIG3-RFI-SW-C-08722 00 KAIG3-RFI-SW-C-08722-00
KAIG3-RFI-SW-C-08721 00 KAIG3-RFI-SW-C-08721-00
KAIG3-RFI-SW-C-08720 00 KAIG3-RFI-SW-C-08720-00
KAIG3-RFI-SW-C-08719 00 KAIG3-RFI-SW-C-08719-00
KAIG3-RFI-EC-S-10133 00 KAIG3-RFI-EC-S-10133-00
KAIG3-RFI-EC-S-10134 00 KAIG3-RFI-EC-S-10134-00
KAIG3-RFI-EC-S-10135 00 KAIG3-RFI-EC-S-10135-00
KAIG3-RFI-EC-S-10136 00 KAIG3-RFI-EC-S-10136-00
KAIG3-RFI-CO-S-10125 00 KAIG3-RFI-CO-S-10125-00
KAIG3-RFI-MC-S-10128 00 KAIG3-RFI-MC-S-10128-00
KAIG3-RFI-MC-S-10129 00 KAIG3-RFI-MC-S-10129-00
KAIG3-RFI-EC-S-10119 00 KAIG3-RFI-EC-S-10119-00
KAIG3-RFI-EC-S-10120 00 KAIG3-RFI-EC-S-10120-00
KAIG3-RFI-CO-S-10121 00 KAIG3-RFI-CO-S-10121-00
KAIG3-RFI-CO-S-10122 00 KAIG3-RFI-CO-S-10122-00
KAIG3-RFI-LM-S-10123 00 KAIG3-RFI-LM-S-10123-00
KAIG3-RFI-CO-S-10126 00 KAIG3-RFI-CO-S-10126-00
KAIG3-RFI-CO-S-10127 00 KAIG3-RFI-CO-S-10127-00
KAIG3-RFI-CO-S-10000 00 KAIG3-RFI-CO-S-10000-00
KAIG3-RFI-LM-S-10113 00 KAIG3-RFI-LM-S-10113-00
KAIG3-RFI-CO-S-10114 00 KAIG3-RFI-CO-S-10114-00
KAIG3-RFI-CO-S-10115 00 KAIG3-RFI-CO-S-10115-00
KAIG3-RFI-CO-S-10116 00 KAIG3-RFI-CO-S-10116-00
KAIG3-RFI-EC-S-10117 00 KAIG3-RFI-EC-S-10117-00
KAIG3-RFI-CO-A-01263 00 KAIG3-RFI-CO-A-01263-00
KAIG3-RFI-SW-C-08718 00 KAIG3-RFI-SW-C-08718-00
KAIG3-RFI-CO-A-1136 01 KAIG3-RFI-CO-A-1136-01
KAIG3-RFI-SW-C-08717 00 KAIG3-RFI-SW-C-08717-00
KAIG3-RFI-LM-SU-03279 00 KAIG3-RFI-LM-SU-03279-00
KAIG3-RFI-CO-SU-03280 00 KAIG3-RFI-CO-SU-03280-00
KAIG3-RFI-MC-SU-03281 00 KAIG3-RFI-MC-SU-03281-00
KAIG3-RFI-SW-C-08716 00 KAIG3-RFI-SW-C-08716-00
KAIG3-RFI-NA-SU-03277 00 KAIG3-RFI-NA-SU-03277-00
KAIG3-RFI-CO-SU-03278 00 KAIG3-RFI-CO-SU-03278-00
KAIG3-RFI-CO-SU-03276 00 KAIG3-RFI-CO-SU-03276-00
KAIG3-RFI-SW-C-08715 00 KAIG3-RFI-SW-C-08715-00
KAIG3-RFI-SW-C-08714 00 KAIG3-RFI-SW-C-08714-00
KAIG3-RFI-SW-C-08713 00 KAIG3-RFI-SW-C-08713-00
KAIG3-RFI-CO-SU-03275 00 KAIG3-RFI-CO-SU-03275-00
KAIG3-RFI-EC-SU-03274 00 KAIG3-RFI-EC-SU-03274-00
KAIG3-RFI-SW-C-08712 00 KAIG3-RFI-SW-C-08712-00
KAIG3-RFI-SW-C-08700 00 KAIG3-RFI-SW-C-08700-00
KAIG3-RFI-SW-C-08699 00 KAIG3-RFI-SW-C-08699-00
KAIG3-RFI-SW-C-08698 00 KAIG3-RFI-SW-C-08698-00
KAIG3-RFI-SW-C-08690 00 KAIG3-RFI-SW-C-08690-00
KAIG3-RFI-SW-C-08689 00 KAIG3-RFI-SW-C-08689-00
KAIG3-RFI-SW-C-08576 00 KAIG3-RFI-SW-C-08576-00
KAIG3-RFI-WG-S-7394 01 KAIG3-RFI-WG-S-7394-01
KAIG3-RFI-TB-S-7377 01 KAIG3-RFI-TB-S-7377-01
KAIG3-RFI-WG-S-9985 00 KAIG3-RFI-WG-S-9985-00
KAIG3-RFI-WG-S-10141 00 KAIG3-RFI-WG-S-10141-00
KAIG3-RFI-WG-S-10140 00 KAIG3-RFI-WG-S-10140-00
KAIG3-RFI-WG-C-8752 00 KAIG3-RFI-WG-C-8752-00
KAIG3-RFI-WG-C-8751 00 KAIG3-RFI-WG-C-8751-00
KAIG3-RFI-SW-C-8750 00 KAIG3-RFI-SW-C-8750-00
KAIG3-RFI-SW-C-8749 00 KAIG3-RFI-SW-C-8749-00
KAIG3-RFI-SW-C-8748 00 KAIG3-RFI-SW-C-8748-00
KAIG3-RFI-SW-C-8747 00 KAIG3-RFI-SW-C-8747-00
KAIG3-RFI-SW-C-8746 00 KAIG3-RFI-SW-C-8746-00
KAIG3-RFI-SW-C-8744 00 KAIG3-RFI-SW-C-8744-00
KAIG3-RFI-SW-C-8743 00 KAIG3-RFI-SW-C-8743-00
KAIG3-RFI-SW-C-8742 00 KAIG3-RFI-SW-C-8742-00
KAIG3-RFI-SW-C-8741 00 KAIG3-RFI-SW-C-8741-00
KAIG3-RFI-SW-C-8740 00 KAIG3-RFI-SW-C-8740-00
KAIG3-RFI-SW-C-8739 00 KAIG3-RFI-SW-C-8739-00
KAIG3-RFI-SW-C-8738 00 KAIG3-RFI-SW-C-8738-00
KAIG3-RFI-SW-C-08737 00 KAIG3-RFI-SW-C-08737-00
KAIG3-RFI-SW-C-8736 00 KAIG3-RFI-SW-C-8736-00
KAIG3-RFI-EC-SU-03271 00 KAIG3-RFI-EC-SU-03271-00
KAIG3-RFI-EC-SU-03272 00 KAIG3-RFI-EC-SU-03272-00
KAIG3-RFI-CO-SU-03268 00 KAIG3-RFI-CO-SU-03268-00
KAIG3-RFI-CO-SU-03266 00 KAIG3-RFI-CO-SU-03266-00
KAIG3-RFI-LM-SU-03267 00 KAIG3-RFI-LM-SU-03267-00
KAIG3-RFI-VG-SU-03273 00 KAIG3-RFI-VG-SU-03273-00
KAIG3-RFI-CO-SU-03263 00 KAIG3-RFI-CO-SU-03263-00
KAIG3-RFI-CO-SU-03262 00 KAIG3-RFI-CO-SU-03262-00
KAIG3-RFI-EC-SU-03264 00 KAIG3-RFI-EC-SU-03264-00
KAIG3-RFI-SW-E-0643 00 KAIG3-RFI-SW-E-0643-00
KAIG3-RFI-LM-LC-0875 00 KAIG3-RFI-LM-LC-0875-00
KAIG3-RFI-LM-S-10064 00 KAIG3-RFI-LM-S-10064-00
KAIG3-RFI-EC-S-10075 00 KAIG3-RFI-EC-S-10075-00
KAIG3-RFI-LM-S-10065 00 KAIG3-RFI-LM-S-10065-00
KAIG3-RFI-LM-S-10067 00 KAIG3-RFI-LM-S-10067-00
KAIG3-RFI-LM-S-10069 00 KAIG3-RFI-LM-S-10069-00
KAIG3-RFI-EC-S-10073 00 KAIG3-RFI-EC-S-10073-00
KAIG3-RFI-EC-S-10074 00 KAIG3-RFI-EC-S-10074-00
KAIG3-RFI-EC-S-10076 00 KAIG3-RFI-EC-S-10076-00
KAIG3-RFI-EC-S-10077 00 KAIG3-RFI-EC-S-10077-00
KAIG3-RFI-CO-S-10078 00 KAIG3-RFI-CO-S-10078-00
KAIG3-RFI-TG-LS-1725 00 KAIG3-RFI-TG-LS-1725-00
KAIG3-RFI-TG-C-8726 00 KAIG3-RFI-TG-C-8726-00
KAIG3-RFI-CO-A-1258 00 KAIG3-RFI-CO-A-1258-00
KAIG3-RFI-MB-P-0362 00 KAIG3-RFI-MB-P-0362-00
KAIG3-RFI-WG-P-0361 00 KAIG3-RFI-WG-P-0361-00
KAIG3-RFI-SW-M-0360 00 KAIG3-RFI-SW-M-0360-00
KAIG3-RFI-PC-P-0345-00 01 KAIG3-RFI-PC-P-0345-00-01
KAIG3-RFI-MB-S-10031 00 KAIG3-RFI-MB-S-10031-00
KAIG3-RFI-WG-C-08728 00 KAIG3-RFI-WG-C-08728-00
KAIG3-RFI-WG-C-08727 00 KAIG3-RFI-WG-C-08727-00
KAIG3-RFI-TG-C-08711 00 KAIG3-RFI-TG-C-08711-00
KAIG3-RFI-WG-C-08710 00 KAIG3-RFI-WG-C-08710-00
KAIG3-RFI-PG-C-08709 00 KAIG3-RFI-PG-C-08709-00
KAIG3-RFI-PG-C-08708 00 KAIG3-RFI-PG-C-08708-00
KAIG3-RFI-EC-SU-03261 00 KAIG3-RFI-EC-SU-03261-00
KAIG3-RFI-NA-SU-3234 00 KAIG3-RFI-NA-SU-3234-00
KAIG3-RFI-CF-SU-03257 00 KAIG3-RFI-CF-SU-03257-00
KAIG3-RFI-CF-SU-03258 00 KAIG3-RFI-CF-SU-03258-00
KAIG3-RFI-CF-SU-03259 00 KAIG3-RFI-CF-SU-03259-00
KAIG3-RFI-EC-C-08701 00 KAIG3-RFI-EC-C-08701-00
KAIG3-RFI-CO-C-08703 00 KAIG3-RFI-CO-C-08703-00
KAIG3-RFI-EC-C-08702 00 KAIG3-RFI-EC-C-08702-00
KAIG3-RFI-MC-C-08688 00 KAIG3-RFI-MC-C-08688-00
KAIG3-RFI-CO-C-08671 00 KAIG3-RFI-CO-C-08671-00
KAIG3-RFI-EC-S-10118 00 KAIG3-RFI-EC-S-10118-00
KAIG3-RFI-LM-E-0638 00 KAIG3-RFI-LM-E-0638-00
KAIG3-RFI-SW-C-5271 01 KAIG3-RFI-SW-C-5271-01
KAIG3-RFI-SW-C-08697 00 KAIG3-RFI-SW-C-08697-00
KAIG3-RFI-SW-C-08696 00 KAIG3-RFI-SW-C-08696-00
KAIG3-RFI-SW-C-08695 00 KAIG3-RFI-SW-C-08695-00
KAIG3-RFI-SW-C-08694 00 KAIG3-RFI-SW-C-08694-00
KAIG3-RFI-SW-C-08693 00 KAIG3-RFI-SW-C-08693-00
KAIG3-RFI-SW-C-08692 00 KAIG3-RFI-SW-C-08692-00
KAIG3-RFI-SW-C-08691 00 KAIG3-RFI-SW-C-08691-00
KAIG3-RFI-SW-C-08685 00 KAIG3-RFI-SW-C-08685-00
KAIG3-RFI-SW-C-08684 00 KAIG3-RFI-SW-C-08684-00
KAIG3-RFI-SW-C-08683 00 KAIG3-RFI-SW-C-08683-00
KAIG3-RFI-SW-C-08682 00 KAIG3-RFI-SW-C-08682-00
KAIG3-RFI-SW-C-08679 00 KAIG3-RFI-SW-C-08679-00
KAIG3-RFI-CO-S-10059 00 KAIG3-RFI-CO-S-10059-00
KAIG3-RFI-CO-S-10060 00 KAIG3-RFI-CO-S-10060-00
KAIG3-RFI-CO-C-08653 00 KAIG3-RFI-CO-C-08653-00
KAIG3-RFI-CO-C-08654 00 KAIG3-RFI-CO-C-08654-00
KAIG3-RFI-WG-C-08706 00 KAIG3-RFI-WG-C-08706-00
KAIG3-RFI-VG-C-08655 00 KAIG3-RFI-VG-C-08655-00
KAIG3-RFI-AG-C-08705 00 KAIG3-RFI-AG-C-08705-00
KAIG3-RFI-WG-C-08704 00 KAIG3-RFI-WG-C-08704-00
KAIG3-RFI-WG-C-08687 00 KAIG3-RFI-WG-C-08687-00
KAIG3-RFI-WG-C-08686 00 KAIG3-RFI-WG-C-08686-00
KAIG3-RFI-LM-SU-03252 00 KAIG3-RFI-LM-SU-03252-00
KAIG3-RFI-CO-SU-03250 00 KAIG3-RFI-CO-SU-03250-00
KAIG3-RFI-LM-SU-03251 00 KAIG3-RFI-LM-SU-03251-00
KAIG3-RFI-EC-SU-03254 00 KAIG3-RFI-EC-SU-03254-00
KAIG3-RFI-EC-SU-03255 00 KAIG3-RFI-EC-SU-03255-00
KAIG3-RFI-CO-SU-03249 00 KAIG3-RFI-CO-SU-03249-00
KAIG3-RFI-CO-S-10044 00 KAIG3-RFI-CO-S-10044-00
KAIG3-RFI-SM-S-10051 00 KAIG3-RFI-SM-S-10051-00
KAIG3-RFI-NA-S-09976 00 KAIG3-RFI-NA-S-09976-00
KAIG3-RFI-CO-S-10052 00 KAIG3-RFI-CO-S-10052-00
KAIG3-RFI-CO-S-10053 00 KAIG3-RFI-CO-S-10053-00
KAIG3-RFI-CF-S-10055 00 KAIG3-RFI-CF-S-10055-00
KAIG3-RFI-CO-A-01245 00 KAIG3-RFI-CO-A-01245-00
KAIG3-RFI-CO-A-01246 00 KAIG3-RFI-CO-A-01246-00
KAIG3-RFI-EC-C-08613 00 KAIG3-RFI-EC-C-08613-00
KAIG3-RFI-CO-C-08635 00 KAIG3-RFI-CO-C-08635-00
KAIG3-RFI-PG-C-08634 00 KAIG3-RFI-PG-C-08634-00
KAIG3-RFI-CO-C-08636 00 KAIG3-RFI-CO-C-08636-00
KAIG3-RFI-MC-SU-03237 00 KAIG3-RFI-MC-SU-03237-00
KAIG3-RFI-CO-SU-03245 00 KAIG3-RFI-CO-SU-03245-00
KAIG3-RFI-MC-S-10036 00 KAIG3-RFI-MC-S-10036-00
KAIG3-RFI-MC-SU-03238 00 KAIG3-RFI-MC-SU-03238-00
KAIG3-RFI-CO-SU-03239 00 KAIG3-RFI-CO-SU-03239-00
KAIG3-RFI-CO-SU-03241 00 KAIG3-RFI-CO-SU-03241-00
KAIG3-RFI-CO-S-10039 00 KAIG3-RFI-CO-S-10039-00
KAIG3-RFI-CO-S-10049 00 KAIG3-RFI-CO-S-10049-00
KAIG3-RFI-CC-C-08707 00 KAIG3-RFI-CC-C-08707-00
KAIG3-RFI-EC-S-10047 00 KAIG3-RFI-EC-S-10047-00
KAIG3-RFI-LM-S-09897 00 KAIG3-RFI-LM-S-09897-00
KAIG3-RFI-CO-S-10030 00 KAIG3-RFI-CO-S-10030-00
KAIG3-RFI-NA-P-00358 00 KAIG3-RFI-NA-P-00358-00
KAIG3-RFI-CO-S-10027 00 KAIG3-RFI-CO-S-10027-00
KAIG3-RFI-CO-S-10028 00 KAIG3-RFI-CO-S-10028-00
KAIG3-RFI-CO-S-10029 00 KAIG3-RFI-CO-S-10029-00
KAIG3-RFI-LM-P-00357 00 KAIG3-RFI-LM-P-00357-00
KAIG3-RFI-MC-S-10035 00 KAIG3-RFI-MC-S-10035-00
KAIG3-RFI-MC-S-10034 00 KAIG3-RFI-MC-S-10034-00
KAIG3-RFI-CO-S-10037 00 KAIG3-RFI-CO-S-10037-00
KAIG3-RFI-CO-S-10038 00 KAIG3-RFI-CO-S-10038-00
KAIG3-RFI-SW-M-00359 00 KAIG3-RFI-SW-M-00359-00
KAIG3-RFI-CO-S-10040 00 KAIG3-RFI-CO-S-10040-00
KAIG3-RFI-VG-S-10042 00 KAIG3-RFI-VG-S-10042-00
KAIG3-RFI-CO-S-10043 00 KAIG3-RFI-CO-S-10043-00
KAIG3-RFI-EC-S-10045 00 KAIG3-RFI-EC-S-10045-00
KAIG3-RFI-EC-S-10046 00 KAIG3-RFI-EC-S-10046-00
KAIG3-RFI-CO-S-10048 00 KAIG3-RFI-CO-S-10048-00
KAIG3-RFI-SM-S-10050 00 KAIG3-RFI-SM-S-10050-00
KAIG3-RFI-CO-C-08259 00 KAIG3-RFI-CO-C-08259-00
KAIG3-RFI-SW-E-00641 00 KAIG3-RFI-SW-E-00641-00
KAIG3-RFI-SW-E-00640 00 KAIG3-RFI-SW-E-00640-00
KAIG3-RFI-SW-LS-01719 00 KAIG3-RFI-SW-LS-01719-00
KAIG3-RFI-SW-LS-01718 00 KAIG3-RFI-SW-LS-01718-00
KAIG3-RFI-SW-LS-01717 00 KAIG3-RFI-SW-LS-01717-00
KAIG3-RFI-SW-C-08644 00 KAIG3-RFI-SW-C-08644-00
KAIG3-RFI-SW-C-08643 00 KAIG3-RFI-SW-C-08643-00
KAIG3-RFI-SW-C-08642 00 KAIG3-RFI-SW-C-08642-00
KAIG3-RFI-SW-C-08641 00 KAIG3-RFI-SW-C-08641-00
KAIG3-RFI-SW-C-08640 00 KAIG3-RFI-SW-C-08640-00
KAIG3-RFI-SW-C-08639 00 KAIG3-RFI-SW-C-08639-00
KAIG3-RFI-SW-C-08638 00 KAIG3-RFI-SW-C-08638-00
KAIG3-RFI-SW-C-08637 00 KAIG3-RFI-SW-C-08637-00
KAIG3-RFI-SW-C-08630 00 KAIG3-RFI-SW-C-08630-00
KAIG3-RFI-CF-SU-03260 00 KAIG3-RFI-CF-SU-03260-00
KAIG3-RFI-SW-C-08629 00 KAIG3-RFI-SW-C-08629-00
KAIG3-RFI-VG-SU-03256 00 KAIG3-RFI-VG-SU-03256-00
KAIG3-RFI-CO-SU-03240 00 KAIG3-RFI-CO-SU-03240-00
KAIG3-RFI-SW-C-08628 00 KAIG3-RFI-SW-C-08628-00
KAIG3-RFI-SW-C-08627 00 KAIG3-RFI-SW-C-08627-00
KAIG3-RFI-CO-SU-03243 00 KAIG3-RFI-CO-SU-03243-00
KAIG3-RFI-EC-SU-03242 00 KAIG3-RFI-EC-SU-03242-00
KAIG3-RFI-SM-SU-03244 00 KAIG3-RFI-SM-SU-03244-00
KAIG3-RFI-CO-A-01251 00 KAIG3-RFI-CO-A-01251-00
KAIG3-RFI-CF-S-10004 00 KAIG3-RFI-CF-S-10004-00
KAIG3-RFI-CF-S-10005 00 KAIG3-RFI-CF-S-10005-00
KAIG3-RFI-SM-A-01244 00 KAIG3-RFI-SM-A-01244-00
KAIG3-RFI-CO-S-10020 00 KAIG3-RFI-CO-S-10020-00
KAIG3-RFI-CO-S-10021 00 KAIG3-RFI-CO-S-10021-00
KAIG3-RFI-MC-S-10022 00 KAIG3-RFI-MC-S-10022-00
KAIG3-RFI-CO-S-10023 00 KAIG3-RFI-CO-S-10023-00
KAIG3-RFI-PG-S-10057 00 KAIG3-RFI-PG-S-10057-00
KAIG3-RFI-NA-S-10024 00 KAIG3-RFI-NA-S-10024-00
KAIG3-RFI-NA-S-10025 00 KAIG3-RFI-NA-S-10025-00
KAIG3-RFI-PG-LS-01724 00 KAIG3-RFI-PG-LS-01724-00
KAIG3-RFI-PG-C-08669 00 KAIG3-RFI-PG-C-08669-00
KAIG3-RFI-SM-S-10009 00 KAIG3-RFI-SM-S-10009-00
KAIG3-RFI-PG-C-08668 00 KAIG3-RFI-PG-C-08668-00
KAIG3-RFI-SM-S-10010 00 KAIG3-RFI-SM-S-10010-00
KAIG3-RFI-CO-SU-03235 00 KAIG3-RFI-CO-SU-03235-00
KAIG3-RFI-PG-C-08667 00 KAIG3-RFI-PG-C-08667-00
KAIG3-RFI-CO-S-10105 00 KAIG3-RFI-CO-S-10105-00
KAIG3-RFI-WG-C-08666 00 KAIG3-RFI-WG-C-08666-00
KAIG3-RFI-PC-S-10107 00 KAIG3-RFI-PC-S-10107-00
KAIG3-RFI-WG-C-08665 00 KAIG3-RFI-WG-C-08665-00
KAIG3-RFI-PC-S-10108 00 KAIG3-RFI-PC-S-10108-00
KAIG3-RFI-NA-SU-03236 00 KAIG3-RFI-NA-SU-03236-00
KAIG3-RFI-WG-C-08664 00 KAIG3-RFI-WG-C-08664-00
KAIG3-RFI-SM-SU-03233 00 KAIG3-RFI-SM-SU-03233-00
KAIG3-RFI-WG-C-08663 00 KAIG3-RFI-WG-C-08663-00
KAIG3-RFI-CO-C-08594 00 KAIG3-RFI-CO-C-08594-00
KAIG3-RFI-CO-C-08592 00 KAIG3-RFI-CO-C-08592-00
KAIG3-RFI-CO-C-08593 00 KAIG3-RFI-CO-C-08593-00
KAIG3-RFI-CO-S-10109 00 KAIG3-RFI-CO-S-10109-00
KAIG3-RFI-CO-S-10110 00 KAIG3-RFI-CO-S-10110-00
KAIG3-RFI-CO-S-10111 00 KAIG3-RFI-CO-S-10111-00
KAIG3-RFI-CO-S-10112 00 KAIG3-RFI-CO-S-10112-00
KAIG3-RFI-CO-S-10061 00 KAIG3-RFI-CO-S-10061-00
KAIG3-RFI-CO-S-10101 00 KAIG3-RFI-CO-S-10101-00
KAIG3-RFI-VG-S-10102 00 KAIG3-RFI-VG-S-10102-00
KAIG3-RFI-CO-S-8006 01 KAIG3-RFI-CO-S-8006-01
KAIG3-RFI-EC-S-10103 00 KAIG3-RFI-EC-S-10103-00
KAIG3-RFI-CF-S-10095 00 KAIG3-RFI-CF-S-10095-00
KAIG3-RFI-CF-S-10089 00 KAIG3-RFI-CF-S-10089-00
KAIG3-RFI-NA-S-10014 00 KAIG3-RFI-NA-S-10014-00
KAIG3-RFI-CO-S-09952 00 KAIG3-RFI-CO-S-09952-00
KAIG3-RFI-VG-S-10087 00 KAIG3-RFI-VG-S-10087-00
KAIG3-RFI-CO-S-10097 00 KAIG3-RFI-CO-S-10097-00
KAIG3-RFI-CO-S-10098 00 KAIG3-RFI-CO-S-10098-00
KAIG3-RFI-CO-S-10099 00 KAIG3-RFI-CO-S-10099-00
KAIG3-RFI-CF-S-10088 00 KAIG3-RFI-CF-S-10088-00
KAIG3-RFI-CF-S-10090 00 KAIG3-RFI-CF-S-10090-00
KAIG3-RFI-CF-S-10091 00 KAIG3-RFI-CF-S-10091-00
KAIG3-RFI-CF-S-10092 00 KAIG3-RFI-CF-S-10092-00
KAIG3-RFI-CF-S-10093 00 KAIG3-RFI-CF-S-10093-00
KAIG3-RFI-CF-S-10094 00 KAIG3-RFI-CF-S-10094-00
KAIG3-RFI-VG-S-10083 00 KAIG3-RFI-VG-S-10083-00
KAIG3-RFI-VG-S-10084 00 KAIG3-RFI-VG-S-10084-00
KAIG3-RFI-VG-S-10085 00 KAIG3-RFI-VG-S-10085-00
KAIG3-RFI-VG-S-10086 00 KAIG3-RFI-VG-S-10086-00
KAIG3-RFI-CO-S-10100 00 KAIG3-RFI-CO-S-10100-00
KAIG3-RFI-VG-S-08561 01 KAIG3-RFI-VG-S-08561-01
KAIG3-RFI-VG-S-08561 00 KAIG3-RFI-VG-S-08561-00
KAIG3-RFI-LM-LC-0872 00 KAIG3-RFI-LM-LC-0872-00
KAIG3-RFI-SW-C-08681 00 KAIG3-RFI-SW-C-08681-00
KAIG3-RFI-SW-C-08680 00 KAIG3-RFI-SW-C-08680-00
KAIG3-RFI-SW-C-08678 00 KAIG3-RFI-SW-C-08678-00
KAIG3-RFI-SW-C-08677 00 KAIG3-RFI-SW-C-08677-00
KAIG3-RFI-SW-C-08676 00 KAIG3-RFI-SW-C-08676-00
KAIG3-RFI-SW-C-08675 00 KAIG3-RFI-SW-C-08675-00
KAIG3-RFI-SW-C-08674 00 KAIG3-RFI-SW-C-08674-00
KAIG3-RFI-SW-C-08673 00 KAIG3-RFI-SW-C-08673-00
KAIG3-RFI-SW-C-08672 00 KAIG3-RFI-SW-C-08672-00
KAIG3-RFI-SW-C-08650 00 KAIG3-RFI-SW-C-08650-00
KAIG3-RFI-SW-C-08649 00 KAIG3-RFI-SW-C-08649-00
KAIG3-RFI-SW-C-08648 00 KAIG3-RFI-SW-C-08648-00
KAIG3-RFI-SW-C-08647 00 KAIG3-RFI-SW-C-08647-00
KAIG3-RFI-SW-C-08646 00 KAIG3-RFI-SW-C-08646-00
KAIG3-RFI-SW-C-08645 00 KAIG3-RFI-SW-C-08645-00
KAIG3-RFI-SW-C-4800 01 KAIG3-RFI-SW-C-4800-01
KAIG3-RFI-SW-C-08626 00 KAIG3-RFI-SW-C-08626-00
KAIG3-RFI-SW-C-08625 00 KAIG3-RFI-SW-C-08625-00
KAIG3-RFI-SW-C-08623 00 KAIG3-RFI-SW-C-08623-00
KAIG3-RFI-SW-C-08624 00 KAIG3-RFI-SW-C-08624-00
KAIG3-RFI-SW-C-08622 00 KAIG3-RFI-SW-C-08622-00
KAIG3-RFI-SW-C-08621 00 KAIG3-RFI-SW-C-08621-00
KAIG3-RFI-SW-C-08620 00 KAIG3-RFI-SW-C-08620-00
KAIG3-RFI-MC-S-10096 00 KAIG3-RFI-MC-S-10096-00
KAIG3-RFI-CO-S-09968 00 KAIG3-RFI-CO-S-09968-00
KAIG3-RFI-VG-S-09992 00 KAIG3-RFI-VG-S-09992-00
KAIG3-RFI-CO-S-10041 00 KAIG3-RFI-CO-S-10041-00
KAIG3-RFI-NA-S-10026 00 KAIG3-RFI-NA-S-10026-00
KAIG3-RFI-CO-S-10082 00 KAIG3-RFI-CO-S-10082-00
KAIG3-RFI-SW-LS-01713 00 KAIG3-RFI-SW-LS-01713-00
KAIG3-RFI-SW-C-08604 00 KAIG3-RFI-SW-C-08604-00
KAIG3-RFI-SW-C-08603 00 KAIG3-RFI-SW-C-08603-00
KAIG3-RFI-SW-C-08602 00 KAIG3-RFI-SW-C-08602-00
KAIG3-RFI-SW-C-08601 00 KAIG3-RFI-SW-C-08601-00
KAIG3-RFI-SW-C-08600 00 KAIG3-RFI-SW-C-08600-00
KAIG3-RFI-SW-C-08599 00 KAIG3-RFI-SW-C-08599-00
KAIG3-RFI-SW-C-08598 00 KAIG3-RFI-SW-C-08598-00
KAIG3-RFI-SW-C-08597 00 KAIG3-RFI-SW-C-08597-00
KAIG3-RFI-SW-C-08596 00 KAIG3-RFI-SW-C-08596-00
KAIG3-RFI-SW-C-08590 00 KAIG3-RFI-SW-C-08590-00
KAIG3-RFI-SW-C-08589 00 KAIG3-RFI-SW-C-08589-00
KAIG3-RFI-SW-C-08588 00 KAIG3-RFI-SW-C-08588-00
KAIG3-RFI-SW-C-08587 00 KAIG3-RFI-SW-C-08587-00
KAIG3-RFI-SW-C-08586 00 KAIG3-RFI-SW-C-08586-00
KAIG3-RFI-SW-C-08585 00 KAIG3-RFI-SW-C-08585-00
KAIG3-RFI-SW-C-08584 00 KAIG3-RFI-SW-C-08584-00
KAIG3-RFI-SW-C-08580 00 KAIG3-RFI-SW-C-08580-00
KAIG3-RFI-SW-C-08579 00 KAIG3-RFI-SW-C-08579-00
KAIG3-RFI-SW-C-08578 00 KAIG3-RFI-SW-C-08578-00
KAIG3-RFI-SW-C-08577 00 KAIG3-RFI-SW-C-08577-00
KAIG3-RFI-PC-P-00356 00 KAIG3-RFI-PC-P-00356-00
KAIG3-RFI-PG-SU-3253 00 KAIG3-RFI-PG-SU-3253-00
KAIG3-RFI-PG-S-10071 00 KAIG3-RFI-PG-S-10071-00
KAIG3-RFI-WG-S-10070 00 KAIG3-RFI-WG-S-10070-00
KAIG3-RFI-TG-LS-1722 00 KAIG3-RFI-TG-LS-1722-00
KAIG3-RFI-TG-LS-1721 00 KAIG3-RFI-TG-LS-1721-00
KAIG3-RFI-AG-C-08662 00 KAIG3-RFI-AG-C-08662-00
KAIG3-RFI-PG-C-08661 00 KAIG3-RFI-PG-C-08661-00
KAIG3-RFI-WG-C-08660 00 KAIG3-RFI-WG-C-08660-00
KAIG3-RFI-WG-C-08659 00 KAIG3-RFI-WG-C-08659-00
KAIG3-RFI-WG-C-08658 00 KAIG3-RFI-WG-C-08658-00
KAIG3-RFI-CO-A-01257 00 KAIG3-RFI-CO-A-01257-00
KAIG3-RFI-CO-A-01256 00 KAIG3-RFI-CO-A-01256-00
KAIG3-RFI-CO-A-01255 00 KAIG3-RFI-CO-A-01255-00
KAIG3-RFI-CO-C-08349 00 KAIG3-RFI-CO-C-08349-00
KAIG3-RFI-WG-C-08657 00 KAIG3-RFI-WG-C-08657-00
KAIG3-RFI-CO-A-01254 00 KAIG3-RFI-CO-A-01254-00
KAIG3-RFI-CO-A-01253 00 KAIG3-RFI-CO-A-01253-00
KAIG3-RFI-WG-C-08652 00 KAIG3-RFI-WG-C-08652-00
KAIG3-RFI-WG-C-08651 00 KAIG3-RFI-WG-C-08651-00
KAIG3-RFI-CO-A-01252 00 KAIG3-RFI-CO-A-01252-00
KAIG3-RFI-WG-C-08612 00 KAIG3-RFI-WG-C-08612-00
KAIG3-RFI-SW-A-01248 00 KAIG3-RFI-SW-A-01248-00
KAIG3-RFI-VG-SU-03092 00 KAIG3-RFI-VG-SU-03092-00
KAIG3-RFI-VG-SU-03094 00 KAIG3-RFI-VG-SU-03094-00
KAIG3-RFI-CF-E-00639 00 KAIG3-RFI-CF-E-00639-00
KAIG3-RFI-CC-SU-03157 00 KAIG3-RFI-CC-SU-03157-00
KAIG3-RFI-CO-C-07776 00 KAIG3-RFI-CO-C-07776-00
KAIG3-RFI-CO-A-01239 00 KAIG3-RFI-CO-A-01239-00
KAIG3-RFI-CO-A-01237 00 KAIG3-RFI-CO-A-01237-00
KAIG3-RFI-CO-A-01238 00 KAIG3-RFI-CO-A-01238-00
KAIG3-RFI-SW-LS-01710 00 KAIG3-RFI-SW-LS-01710-00
KAIG3-RFI-SW-C-08575 00 KAIG3-RFI-SW-C-08575-00
KAIG3-RFI-SW-C-08574 00 KAIG3-RFI-SW-C-08574-00
KAIG3-RFI-SW-C-08569 00 KAIG3-RFI-SW-C-08569-00
KAIG3-RFI-SW-C-08568 00 KAIG3-RFI-SW-C-08568-00
KAIG3-RFI-SW-C-08567 00 KAIG3-RFI-SW-C-08567-00
KAIG3-RFI-SW-C-08566 00 KAIG3-RFI-SW-C-08566-00
KAIG3-RFI-SW-C-08565 00 KAIG3-RFI-SW-C-08565-00
KAIG3-RFI-SW-C-08564 00 KAIG3-RFI-SW-C-08564-00
KAIG3-RFI-SW-C-08563 00 KAIG3-RFI-SW-C-08563-00
KAIG3-RFI-SW-C-08562 00 KAIG3-RFI-SW-C-08562-00
KAIG3-RFI-SW-C-08545 00 KAIG3-RFI-SW-C-08545-00
KAIG3-RFI-SW-C-08544 00 KAIG3-RFI-SW-C-08544-00
KAIG3-RFI-SW-C-08543 00 KAIG3-RFI-SW-C-08543-00
KAIG3-RFI-SW-C-08542 00 KAIG3-RFI-SW-C-08542-00
KAIG3-RFI-WG-LS-01723 00 KAIG3-RFI-WG-LS-01723-00
KAIG3-RFI-WG-C-08656 00 KAIG3-RFI-WG-C-08656-00
KAIG3-RFI-WG-LS-01720 00 KAIG3-RFI-WG-LS-01720-00
KAIG3-RFI-SW-E-00636 00 KAIG3-RFI-SW-E-00636-00
KAIG3-RFI-SW-E-00635 00 KAIG3-RFI-SW-E-00635-00
KAIG3-RFI-TT-C-08311 00 KAIG3-RFI-TT-C-08311-00
KAIG3-RFI-WG-C-08632 00 KAIG3-RFI-WG-C-08632-00
KAIG3-RFI-WG-C-08631 00 KAIG3-RFI-WG-C-08631-00
KAIG3-RFI-WG-C-08595 00 KAIG3-RFI-WG-C-08595-00
KAIG3-RFI-SW-C-08461 00 KAIG3-RFI-SW-C-08461-00
KAIG3-RFI-CO-S-10006 00 KAIG3-RFI-CO-S-10006-00
KAIG3-RFI-CO-S-10003 00 KAIG3-RFI-CO-S-10003-00
KAIG3-RFI-CO-S-10001 00 KAIG3-RFI-CO-S-10001-00
KAIG3-RFI-CC-M-00355 00 KAIG3-RFI-CC-M-00355-00
KAIG3-RFI-CO-SU-02930 00 KAIG3-RFI-CO-SU-02930-00
KAIG3-RFI-SW-M-00354 00 KAIG3-RFI-SW-M-00354-00
KAIG3-RFI-SW-C-08619 00 KAIG3-RFI-SW-C-08619-00
KAIG3-RFI-SW-C-08618 00 KAIG3-RFI-SW-C-08618-00
KAIG3-RFI-FC-A-1247 00 KAIG3-RFI-FC-A-1247-00
KAIG3-RFI-PG-C-8633 00 KAIG3-RFI-PG-C-8633-00
KAIG3-RFI-AG-S-10056 00 KAIG3-RFI-AG-S-10056-00
KAIG3-RFI-PG-SU-3247 00 KAIG3-RFI-PG-SU-3247-00
KAIG3-RFI-AG-SU-3246 00 KAIG3-RFI-AG-SU-3246-00
KAIG3-RFI-PG-C-8617 00 KAIG3-RFI-PG-C-8617-00
KAIG3-RFI-PG-C-8616 00 KAIG3-RFI-PG-C-8616-00
KAIG3-RFI-PG-C-8615 00 KAIG3-RFI-PG-C-8615-00
KAIG3-RFI-PG-C-8614 00 KAIG3-RFI-PG-C-8614-00
KAIG3-RFI-MC-S-9936 00 KAIG3-RFI-MC-S-9936-00
KAIG3-RFI-WG-C-8611 00 KAIG3-RFI-WG-C-8611-00
KAIG3-RFI-WG-C-8610 00 KAIG3-RFI-WG-C-8610-00
KAIG3-RFI-MB-C-8609 00 KAIG3-RFI-MB-C-8609-00
KAIG3-RFI-PG-C-8608 00 KAIG3-RFI-PG-C-8608-00
KAIG3-RFI-WG-LS-1716 00 KAIG3-RFI-WG-LS-1716-00
KAIG3-RFI-SW-C-7357 00 KAIG3-RFI-SW-C-7357-00
KAIG3-RFI-CO-A-1198 00 KAIG3-RFI-CO-A-1198-00
KAIG3-RFI-CO-A-1199 00 KAIG3-RFI-CO-A-1199-00
KAIG3-RFI-CO-S-9998 00 KAIG3-RFI-CO-S-9998-00
KAIG3-RFI-CO-S-9999 00 KAIG3-RFI-CO-S-9999-00
KAIG3-RFI-CO-S-10002 00 KAIG3-RFI-CO-S-10002-00
KAIG3-RFI-WG-C-8607 00 KAIG3-RFI-WG-C-8607-00
KAIG3-RFI-WG-C-8606 00 KAIG3-RFI-WG-C-8606-00
KAIG3-RFI-WG-LS-1715 00 KAIG3-RFI-WG-LS-1715-00
KAIG3-RFI-WG-LS-1714 00 KAIG3-RFI-WG-LS-1714-00
KAIG3-RFI-TT-A-1242 00 KAIG3-RFI-TT-A-1242-00
KAIG3-RFI-AG-A-1241 00 KAIG3-RFI-AG-A-1241-00
KAIG3-RFI-AG-A-1240 00 KAIG3-RFI-AG-A-1240-00
KAIG3-RFI-AG-S-10016 00 KAIG3-RFI-AG-S-10016-00
KAIG3-RFI-MB-S-10015 00 KAIG3-RFI-MB-S-10015-00
KAIG3-RFI-WG-C-8591 00 KAIG3-RFI-WG-C-8591-00
KAIG3-RFI-SW-E-0633 00 KAIG3-RFI-SW-E-0633-00
KAIG3-RFI-CO-SU-3230 00 KAIG3-RFI-CO-SU-3230-00
KAIG3-RFI-VG-P-0353 00 KAIG3-RFI-VG-P-0353-00
KAIG3-RFI-CF-SU-3231 00 KAIG3-RFI-CF-SU-3231-00
KAIG3-RFI-CO-SU-3232 00 KAIG3-RFI-CO-SU-3232-00
KAIG3-RFI-SW-M-0352 00 KAIG3-RFI-SW-M-0352-00
KAIG3-RFI-EC-S-9997 00 KAIG3-RFI-EC-S-9997-00
KAIG3-RFI-EC-S-9996 00 KAIG3-RFI-EC-S-9996-00
KAIG3-RFI-EC-S-9995 00 KAIG3-RFI-EC-S-9995-00
KAIG3-RFI-VG-C-8559 00 KAIG3-RFI-VG-C-8559-00
KAIG3-RFI-SW-LS-1712 00 KAIG3-RFI-SW-LS-1712-00
KAIG3-RFI-PC-LS-1711 00 KAIG3-RFI-PC-LS-1711-00
KAIG3-RFI-CO-C-8558 00 KAIG3-RFI-CO-C-8558-00
KAIG3-RFI-CO-C-8560 00 KAIG3-RFI-CO-C-8560-00
KAIG3-RFI-CO-C-8561 00 KAIG3-RFI-CO-C-8561-00
KAIG3-RFI-CO-C-8581 00 KAIG3-RFI-CO-C-8581-00
KAIG3-RFI-CO-C-8552 00 KAIG3-RFI-CO-C-8552-00
KAIG3-RFI-CO-S-10007 00 KAIG3-RFI-CO-S-10007-00
KAIG3-RFI-CO-S-10008 00 KAIG3-RFI-CO-S-10008-00
KAIG3-RFI-CC-S-9954 00 KAIG3-RFI-CC-S-9954-00
KAIG3-RFI-SW-C-8541 00 KAIG3-RFI-SW-C-8541-00
KAIG3-RFI-SW-C-8540 00 KAIG3-RFI-SW-C-8540-00
KAIG3-RFI-CO-A-1233 00 KAIG3-RFI-CO-A-1233-00
KAIG3-RFI-SW-C-8539 00 KAIG3-RFI-SW-C-8539-00
KAIG3-RFI-CO-SU-3212 00 KAIG3-RFI-CO-SU-3212-00
KAIG3-RFI-EC-SU-3224 00 KAIG3-RFI-EC-SU-3224-00
KAIG3-RFI-SW-C-8538 00 KAIG3-RFI-SW-C-8538-00
KAIG3-RFI-CO-SU-3225 00 KAIG3-RFI-CO-SU-3225-00
KAIG3-RFI-SW-C-8537 00 KAIG3-RFI-SW-C-8537-00
KAIG3-RFI-VG-SU-3227 00 KAIG3-RFI-VG-SU-3227-00
KAIG3-RFI-SW-C-8536 00 KAIG3-RFI-SW-C-8536-00
KAIG3-RFI-SW-C-8535 00 KAIG3-RFI-SW-C-8535-00
KAIG3-RFI-CO-SU-3226 00 KAIG3-RFI-CO-SU-3226-00
KAIG3-RFI-SW-C-8534 00 KAIG3-RFI-SW-C-8534-00
KAIG3-RFI-NA-SU-3223 00 KAIG3-RFI-NA-SU-3223-00
KAIG3-RFI-SW-C-8533 00 KAIG3-RFI-SW-C-8533-00
KAIG3-RFI-SW-C-8532 00 KAIG3-RFI-SW-C-8532-00
KAIG3-RFI-SW-C-8525 00 KAIG3-RFI-SW-C-8525-00
KAIG3-RFI-EC-C-8546 00 KAIG3-RFI-EC-C-8546-00
KAIG3-RFI-SW-C-8524 00 KAIG3-RFI-SW-C-8524-00
KAIG3-RFI-VG-C-8551 00 KAIG3-RFI-VG-C-8551-00
KAIG3-RFI-SW-C-8523 00 KAIG3-RFI-SW-C-8523-00
KAIG3-RFI-CO-C-8530 00 KAIG3-RFI-CO-C-8530-00
KAIG3-RFI-SW-C-8522 00 KAIG3-RFI-SW-C-8522-00
KAIG3-RFI-AG-A-1236 00 KAIG3-RFI-AG-A-1236-00
KAIG3-RFI-TB-S-9994 00 KAIG3-RFI-TB-S-9994-00
KAIG3-RFI-TB-SU-3228 00 KAIG3-RFI-TB-SU-3228-00
KAIG3-RFI-PG-C-8583 00 KAIG3-RFI-PG-C-8583-00
KAIG3-RFI-WG-C-8582 00 KAIG3-RFI-WG-C-8582-00
KAIG3-RFI-MB-C-8572 00 KAIG3-RFI-MB-C-8572-00
KAIG3-RFI-PG-C-8571 00 KAIG3-RFI-PG-C-8571-00
KAIG3-RFI-PG-C-8557 00 KAIG3-RFI-PG-C-8557-00
KAIG3-RFI-WG-C-8556 00 KAIG3-RFI-WG-C-8556-00
KAIG3-RFI-CO-SU-3220 00 KAIG3-RFI-CO-SU-3220-00
KAIG3-RFI-WG-C-8555 00 KAIG3-RFI-WG-C-8555-00
KAIG3-RFI-SW-C-8554 00 KAIG3-RFI-SW-C-8554-00
KAIG3-RFI-WG-C-8553 00 KAIG3-RFI-WG-C-8553-00
KAIG3-RFI-EC-S-9686 00 KAIG3-RFI-EC-S-9686-00
KAIG3-RFI-SW-LS-1598 00 KAIG3-RFI-SW-LS-1598-00
KAIG3-RFI-WG-LS-1596 00 KAIG3-RFI-WG-LS-1596-00
KAIG3-RFI-SW-C-8521 00 KAIG3-RFI-SW-C-8521-00
KAIG3-RFI-SW-C-8520 00 KAIG3-RFI-SW-C-8520-00
KAIG3-RFI-SW-C-8519 00 KAIG3-RFI-SW-C-8519-00
KAIG3-RFI-SW-C-8518 00 KAIG3-RFI-SW-C-8518-00
KAIG3-RFI-SW-C-8517 00 KAIG3-RFI-SW-C-8517-00
KAIG3-RFI-SW-M-0351 00 KAIG3-RFI-SW-M-0351-00
KAIG3-RFI-SW-M-0350 00 KAIG3-RFI-SW-M-0350-00
KAIG3-RFI-SW-M-0349 00 KAIG3-RFI-SW-M-0349-00
KAIG3-RFI-SW-M-0348 00 KAIG3-RFI-SW-M-0348-00
KAIG3-RFI-SW-M-0334 02 KAIG3-RFI-SW-M-0334-02
KAIG3-RFI-CO-S-9977 00 KAIG3-RFI-CO-S-9977-00
KAIG3-RFI-CO-S-9978 00 KAIG3-RFI-CO-S-9978-00
KAIG3-RFI-CO-S-9979 00 KAIG3-RFI-CO-S-9979-00
KAIG3-RFI-VG-S-9980 00 KAIG3-RFI-VG-S-9980-00
KAIG3-RFI-VG-S-9981 00 KAIG3-RFI-VG-S-9981-00
KAIG3-RFI-EC-S-9982 00 KAIG3-RFI-EC-S-9982-00
KAIG3-RFI-WG-LC-0869 00 KAIG3-RFI-WG-LC-0869-00
KAIG3-RFI-WG-LC-0868 00 KAIG3-RFI-WG-LC-0868-00
KAIG3-RFI-WG-E-0631 00 KAIG3-RFI-WG-E-0631-00
KAIG3-RFI-EC-S-9983 00 KAIG3-RFI-EC-S-9983-00
KAIG3-RFI-EC-S-9984 00 KAIG3-RFI-EC-S-9984-00
KAIG3-RFI-CO-S-9986 00 KAIG3-RFI-CO-S-9986-00
KAIG3-RFI-CO-S-9987 00 KAIG3-RFI-CO-S-9987-00
KAIG3-RFI-CO-S-9988 00 KAIG3-RFI-CO-S-9988-00
KAIG3-RFI-CO-S-9989 00 KAIG3-RFI-CO-S-9989-00
KAIG3-RFI-VG-S-9991 00 KAIG3-RFI-VG-S-9991-00
KAIG3-RFI-CO-S-9990 00 KAIG3-RFI-CO-S-9990-00
KAIG3-RFI-MC-S-9973 00 KAIG3-RFI-MC-S-9973-00
KAIG3-RFI-NA-S-9974 00 KAIG3-RFI-NA-S-9974-00
KAIG3-RFI-SW-C-8516 00 KAIG3-RFI-SW-C-8516-00
KAIG3-RFI-SW-C-8510 00 KAIG3-RFI-SW-C-8510-00
KAIG3-RFI-SW-C-8509 00 KAIG3-RFI-SW-C-8509-00
KAIG3-RFI-SW-C-8508 00 KAIG3-RFI-SW-C-8508-00
KAIG3-RFI-SW-C-8507 00 KAIG3-RFI-SW-C-8507-00
KAIG3-RFI-SW-C-8506 00 KAIG3-RFI-SW-C-8506-00
KAIG3-RFI-NA-S-9975 00 KAIG3-RFI-NA-S-9975-00
KAIG3-RFI-SW-C-8505 00 KAIG3-RFI-SW-C-8505-00
KAIG3-RFI-CO-S-9967 00 KAIG3-RFI-CO-S-9967-00
KAIG3-RFI-CO-S-9970 00 KAIG3-RFI-CO-S-9970-00
KAIG3-RFI-CO-S-9971 00 KAIG3-RFI-CO-S-9971-00
KAIG3-RFI-CO-S-9963 00 KAIG3-RFI-CO-S-9963-00
KAIG3-RFI-CO-S-9960 00 KAIG3-RFI-CO-S-9960-00
KAIG3-RFI-PC-E-0632 00 KAIG3-RFI-PC-E-0632-00
KAIG3-RFI-SM-E-0630 00 KAIG3-RFI-SM-E-0630-00
KAIG3-RFI-SM-E-0629 00 KAIG3-RFI-SM-E-0629-00
KAIG3-RFI-CF-LC-0867 00 KAIG3-RFI-CF-LC-0867-00
KAIG3-RFI-SM-LC-0866 00 KAIG3-RFI-SM-LC-0866-00
KAIG3-RFI-MB-S-9993 00 KAIG3-RFI-MB-S-9993-00
KAIG3-RFI-TG-S-9972 00 KAIG3-RFI-TG-S-9972-00
KAIG3-RFI-TG-SU-3222 00 KAIG3-RFI-TG-SU-3222-00
KAIG3-RFI-PT-A-1235 00 KAIG3-RFI-PT-A-1235-00
KAIG3-RFI-AG-A-1234 00 KAIG3-RFI-AG-A-1234-00
KAIG3-RFI-WG-C-8550 00 KAIG3-RFI-WG-C-8550-00
KAIG3-RFI-WG-C-8549 00 KAIG3-RFI-WG-C-8549-00
KAIG3-RFI-SW-C-8548 00 KAIG3-RFI-SW-C-8548-00
KAIG3-RFI-PG-C-8531 00 KAIG3-RFI-PG-C-8531-00
KAIG3-RFI-CO-S-9948 00 KAIG3-RFI-CO-S-9948-00
KAIG3-RFI-CO-S-9828 00 KAIG3-RFI-CO-S-9828-00
KAIG3-RFI-MB-E-0591 00 KAIG3-RFI-MB-E-0591-00
KAIG3-RFI-MB-E-0590 00 KAIG3-RFI-MB-E-0590-00
KAIG3-RFI-TG-P-0347 00 KAIG3-RFI-TG-P-0347-00
KAIG3-RFI-LM-P-0346 00 KAIG3-RFI-LM-P-0346-00
KAIG3-RFI-PC-P-0345-00 00 KAIG3-RFI-PC-P-0345-00-00
KAIG3-RFI-PC-P-0344 00 KAIG3-RFI-PC-P-0344-00
KAIG3-RFI-WG-C-8547 00 KAIG3-RFI-WG-C-8547-00
KAIG3-RFI-WG-LS-1709 00 KAIG3-RFI-WG-LS-1709-00
KAIG3-RFI-SW-E-0626 00 KAIG3-RFI-SW-E-0626-00
KAIG3-RFI-LM-LC-0865 00 KAIG3-RFI-LM-LC-0865-00
KAIG3-RFI-PC-LC-0864 00 KAIG3-RFI-PC-LC-0864-00
KAIG3-RFI-PC-LC-0863 00 KAIG3-RFI-PC-LC-0863-00
KAIG3-RFI-PC-LC-0862 00 KAIG3-RFI-PC-LC-0862-00
KAIG3-RFI-SW-C-8504 00 KAIG3-RFI-SW-C-8504-00
KAIG3-RFI-SW-C-8503 00 KAIG3-RFI-SW-C-8503-00
KAIG3-RFI-SW-C-8500 00 KAIG3-RFI-SW-C-8500-00
KAIG3-RFI-SW-LS-1707 00 KAIG3-RFI-SW-LS-1707-00
KAIG3-RFI-PG-SU-3221 00 KAIG3-RFI-PG-SU-3221-00
KAIG3-RFI-TT-A-1232 00 KAIG3-RFI-TT-A-1232-00
KAIG3-RFI-AG-A-1230 00 KAIG3-RFI-AG-A-1230-00
KAIG3-RFI-PG-S-9966 00 KAIG3-RFI-PG-S-9966-00
KAIG3-RFI-PG-S-9931 00 KAIG3-RFI-PG-S-9931-00
KAIG3-RFI-TB-S-9930 00 KAIG3-RFI-TB-S-9930-00
KAIG3-RFI-TG-LS-1708 00 KAIG3-RFI-TG-LS-1708-00
KAIG3-RFI-WG-LS-1706 00 KAIG3-RFI-WG-LS-1706-00
KAIG3-RFI-WG-LS-1705 00 KAIG3-RFI-WG-LS-1705-00
KAIG3-RFI-WG-LS-1704 00 KAIG3-RFI-WG-LS-1704-00
KAIG3-RFI-WG-C-8515 00 KAIG3-RFI-WG-C-8515-00
KAIG3-RFI-WG-C-8514 00 KAIG3-RFI-WG-C-8514-00
KAIG3-RFI-WG-C-8513 00 KAIG3-RFI-WG-C-8513-00
KAIG3-RFI-WG-C-8512 00 KAIG3-RFI-WG-C-8512-00
KAIG3-RFI-CO-SU-3156 00 KAIG3-RFI-CO-SU-3156-00
KAIG3-RFI-NT-C-8278 00 KAIG3-RFI-NT-C-8278-00
KAIG3-RFI-CO-S-9942 00 KAIG3-RFI-CO-S-9942-00
KAIG3-RFI-CO-A-1231 00 KAIG3-RFI-CO-A-1231-00
KAIG3-RFI-CO-SU-3216 00 KAIG3-RFI-CO-SU-3216-00
KAIG3-RFI-CO-C-8526 00 KAIG3-RFI-CO-C-8526-00
KAIG3-RFI-CO-C-8527 00 KAIG3-RFI-CO-C-8527-00
KAIG3-RFI-CO-C-8528 00 KAIG3-RFI-CO-C-8528-00
KAIG3-RFI-CO-C-8529 00 KAIG3-RFI-CO-C-8529-00
KAIG3-RFI-CO-SU-3217 00 KAIG3-RFI-CO-SU-3217-00
KAIG3-RFI-CC-SU-3218 00 KAIG3-RFI-CC-SU-3218-00
KAIG3-RFI-CO-C-8479 00 KAIG3-RFI-CO-C-8479-00
KAIG3-RFI-CO-SU-3219 00 KAIG3-RFI-CO-SU-3219-00
KAIG3-RFI-CO-A-1222 00 KAIG3-RFI-CO-A-1222-00
KAIG3-RFI-CO-A-1224 00 KAIG3-RFI-CO-A-1224-00
KAIG3-RFI-CO-A-1223 00 KAIG3-RFI-CO-A-1223-00
KAIG3-RFI-CO-A-1225 00 KAIG3-RFI-CO-A-1225-00
KAIG3-RFI-EC-S-9920 00 KAIG3-RFI-EC-S-9920-00
KAIG3-RFI-CO-S-6430 01 KAIG3-RFI-CO-S-6430-01
KAIG3-RFI-CO-S-9951 00 KAIG3-RFI-CO-S-9951-00
KAIG3-RFI-MC-S-9875 00 KAIG3-RFI-MC-S-9875-00
KAIG3-RFI-MC-S-9876 00 KAIG3-RFI-MC-S-9876-00
KAIG3-RFI-VG-S-9964 00 KAIG3-RFI-VG-S-9964-00
KAIG3-RFI-NA-S-9918 00 KAIG3-RFI-NA-S-9918-00
KAIG3-RFI-CO-S-9908 00 KAIG3-RFI-CO-S-9908-00
KAIG3-RFI-CO-S-9965 00 KAIG3-RFI-CO-S-9965-00
KAIG3-RFI-CO-S-9962 00 KAIG3-RFI-CO-S-9962-00
KAIG3-RFI-CC-S-9953 00 KAIG3-RFI-CC-S-9953-00
KAIG3-RFI-CO-S-9955 00 KAIG3-RFI-CO-S-9955-00
KAIG3-RFI-CO-S-9956 00 KAIG3-RFI-CO-S-9956-00
KAIG3-RFI-CO-S-9957 00 KAIG3-RFI-CO-S-9957-00
KAIG3-RFI-CO-S-9958 00 KAIG3-RFI-CO-S-9958-00
KAIG3-RFI-CO-A-1215 00 KAIG3-RFI-CO-A-1215-00
KAIG3-RFI-LM-SU-3198 00 KAIG3-RFI-LM-SU-3198-00
KAIG3-RFI-CO-S-9943 00 KAIG3-RFI-CO-S-9943-00
KAIG3-RFI-CO-S-9944 00 KAIG3-RFI-CO-S-9944-00
KAIG3-RFI-CO-S-9945 00 KAIG3-RFI-CO-S-9945-00
KAIG3-RFI-CO-S-9959 00 KAIG3-RFI-CO-S-9959-00
KAIG3-RFI-CO-S-9961 00 KAIG3-RFI-CO-S-9961-00
KAIG3-RFI-EC-S-9924 00 KAIG3-RFI-EC-S-9924-00
KAIG3-RFI-SW-P-0342 00 KAIG3-RFI-SW-P-0342-00
KAIG3-RFI-SW-P-0341 00 KAIG3-RFI-SW-P-0341-00
KAIG3-RFI-SW-M-0343 00 KAIG3-RFI-SW-M-0343-00
KAIG3-RFI-MC-SU-3213 00 KAIG3-RFI-MC-SU-3213-00
KAIG3-RFI-MC-SU-3214 00 KAIG3-RFI-MC-SU-3214-00
KAIG3-RFI-MB-A-1229 00 KAIG3-RFI-MB-A-1229-00
KAIG3-RFI-AG-A-1228 00 KAIG3-RFI-AG-A-1228-00
KAIG3-RFI-TT-A-1227 00 KAIG3-RFI-TT-A-1227-00
KAIG3-RFI-WG-C-8496 00 KAIG3-RFI-WG-C-8496-00
KAIG3-RFI-WG-C-8495 00 KAIG3-RFI-WG-C-8495-00
KAIG3-RFI-TG-C-8494 00 KAIG3-RFI-TG-C-8494-00
KAIG3-RFI-TG-C-8493 00 KAIG3-RFI-TG-C-8493-00
KAIG3-RFI-TG-C-8492 00 KAIG3-RFI-TG-C-8492-00
KAIG3-RFI-CC-S-9741 00 KAIG3-RFI-CC-S-9741-00
KAIG3-RFI-MC-S-9937 00 KAIG3-RFI-MC-S-9937-00
KAIG3-RFI-MC-S-9938 00 KAIG3-RFI-MC-S-9938-00
KAIG3-RFI-CO-C-8511 00 KAIG3-RFI-CO-C-8511-00
KAIG3-RFI-CC-S-9742 00 KAIG3-RFI-CC-S-9742-00
KAIG3-RFI-CO-SU-3215 00 KAIG3-RFI-CO-SU-3215-00
KAIG3-RFI-LM-S-9838 00 KAIG3-RFI-LM-S-9838-00
KAIG3-RFI-MC-S-9939 00 KAIG3-RFI-MC-S-9939-00
KAIG3-RFI-CO-S-9779 00 KAIG3-RFI-CO-S-9779-00
KAIG3-RFI-MC-S-9940 00 KAIG3-RFI-MC-S-9940-00
KAIG3-RFI-SM-S-9941 00 KAIG3-RFI-SM-S-9941-00
KAIG3-RFI-EC-S-9946 00 KAIG3-RFI-EC-S-9946-00
KAIG3-RFI-CO-S-9947 00 KAIG3-RFI-CO-S-9947-00
KAIG3-RFI-CO-S-9949 00 KAIG3-RFI-CO-S-9949-00
KAIG3-RFI-CO-S-9950 00 KAIG3-RFI-CO-S-9950-00
KAIG3-RFI-CO-A-1216 00 KAIG3-RFI-CO-A-1216-00
KAIG3-RFI-LM-S-9043 01 KAIG3-RFI-LM-S-9043-01
KAIG3-RFI-CO-C-7597 00 KAIG3-RFI-CO-C-7597-00
KAIG3-RFI-TB-E-0628 00 KAIG3-RFI-TB-E-0628-00
KAIG3-RFI-TG-C-8211 00 KAIG3-RFI-TG-C-8211-00
KAIG3-RFI-TB-E-0627 00 KAIG3-RFI-TB-E-0627-00
KAIG3-RFI-CO-C-8476 00 KAIG3-RFI-CO-C-8476-00
KAIG3-RFI-CO-C-8477 00 KAIG3-RFI-CO-C-8477-00
KAIG3-RFI-CO-C-8478 00 KAIG3-RFI-CO-C-8478-00
KAIG3-RFI-CO-A-1226 00 KAIG3-RFI-CO-A-1226-00
KAIG3-RFI-JG-C-8480 00 KAIG3-RFI-JG-C-8480-00
KAIG3-RFI-VG-C-8471 00 KAIG3-RFI-VG-C-8471-00
KAIG3-RFI-JG-C-8472 00 KAIG3-RFI-JG-C-8472-00
KAIG3-RFI-NA-SU-3204 00 KAIG3-RFI-NA-SU-3204-00
KAIG3-RFI-EC-SU-3205 00 KAIG3-RFI-EC-SU-3205-00
KAIG3-RFI-EC-SU-3206 00 KAIG3-RFI-EC-SU-3206-00
KAIG3-RFI-EC-SU-3207 00 KAIG3-RFI-EC-SU-3207-00
KAIG3-RFI-CO-SU-3203 00 KAIG3-RFI-CO-SU-3203-00
KAIG3-RFI-CO-SS-0451 00 KAIG3-RFI-CO-SS-0451-00
KAIG3-RFI-CC-S-9933 00 KAIG3-RFI-CC-S-9933-00
KAIG3-RFI-NA-S-9917 00 KAIG3-RFI-NA-S-9917-00
KAIG3-RFI-EC-S-9921 00 KAIG3-RFI-EC-S-9921-00
KAIG3-RFI-EC-S-9923 00 KAIG3-RFI-EC-S-9923-00
KAIG3-RFI-WG-S-9565 00 KAIG3-RFI-WG-S-9565-00
KAIG3-RFI-EC-S-9925 00 KAIG3-RFI-EC-S-9925-00
KAIG3-RFI-EC-S-9926 00 KAIG3-RFI-EC-S-9926-00
KAIG3-RFI-CO-S-9927 00 KAIG3-RFI-CO-S-9927-00
KAIG3-RFI-VG-S-9932 00 KAIG3-RFI-VG-S-9932-00
KAIG3-RFI-CO-S-9914 00 KAIG3-RFI-CO-S-9914-00
KAIG3-RFI-CO-S-9915 00 KAIG3-RFI-CO-S-9915-00
KAIG3-RFI-CO-S-9916 00 KAIG3-RFI-CO-S-9916-00
KAIG3-RFI-CO-S-9911 00 KAIG3-RFI-CO-S-9911-00
KAIG3-RFI-CO-S-9912 00 KAIG3-RFI-CO-S-9912-00
KAIG3-RFI-CO-S-9913 00 KAIG3-RFI-CO-S-9913-00
KAIG3-RFI-MC-SU-3162 00 KAIG3-RFI-MC-SU-3162-00
KAIG3-RFI-CO-C-8313 00 KAIG3-RFI-CO-C-8313-00
KAIG3-RFI-TG-LS-1703 00 KAIG3-RFI-TG-LS-1703-00
KAIG3-RFI-WG-C-8491 00 KAIG3-RFI-WG-C-8491-00
KAIG3-RFI-WG-C-8483 00 KAIG3-RFI-WG-C-8483-00
KAIG3-RFI-PG-C-8482 00 KAIG3-RFI-PG-C-8482-00
KAIG3-RFI-WG-C-8481 00 KAIG3-RFI-WG-C-8481-00
KAIG3-RFI-WG-C-8475 00 KAIG3-RFI-WG-C-8475-00
KAIG3-RFI-WG-C-8474 00 KAIG3-RFI-WG-C-8474-00
KAIG3-RFI-WG-C-8473 00 KAIG3-RFI-WG-C-8473-00
KAIG3-RFI-SW-C-8502 00 KAIG3-RFI-SW-C-8502-00
KAIG3-RFI-SW-C-8501 00 KAIG3-RFI-SW-C-8501-00
KAIG3-RFI-SW-C-8499 00 KAIG3-RFI-SW-C-8499-00
KAIG3-RFI-SW-C-8498 00 KAIG3-RFI-SW-C-8498-00
KAIG3-RFI-SW-C-8497 00 KAIG3-RFI-SW-C-8497-00
KAIG3-RFI-SW-C-8490 00 KAIG3-RFI-SW-C-8490-00
KAIG3-RFI-SW-C-8489 00 KAIG3-RFI-SW-C-8489-00
KAIG3-RFI-SW-C-8488 00 KAIG3-RFI-SW-C-8488-00
KAIG3-RFI-WG-SU-3211 00 KAIG3-RFI-WG-SU-3211-00
KAIG3-RFI-WG-SU-3210 00 KAIG3-RFI-WG-SU-3210-00
KAIG3-RFI-WG-SU-3209 00 KAIG3-RFI-WG-SU-3209-00
KAIG3-RFI-PG-SU-3208 00 KAIG3-RFI-PG-SU-3208-00
KAIG3-RFI-PG-S-9929 00 KAIG3-RFI-PG-S-9929-00
KAIG3-RFI-PG-S-9928 00 KAIG3-RFI-PG-S-9928-00
KAIG3-RFI-WG-S-9919 00 KAIG3-RFI-WG-S-9919-00
KAIG3-RFI-MB-A-1221 00 KAIG3-RFI-MB-A-1221-00
KAIG3-RFI-WG-E-0625 00 KAIG3-RFI-WG-E-0625-00
KAIG3-RFI-TG-E-0599 01 KAIG3-RFI-TG-E-0599-01
KAIG3-RFI-TG-LC-0858 00 KAIG3-RFI-TG-LC-0858-00
KAIG3-RFI-SW-C-8487 00 KAIG3-RFI-SW-C-8487-00
KAIG3-RFI-SW-C-8486 00 KAIG3-RFI-SW-C-8486-00
KAIG3-RFI-SW-C-8485 00 KAIG3-RFI-SW-C-8485-00
KAIG3-RFI-SW-C-8484 00 KAIG3-RFI-SW-C-8484-00
KAIG3-RFI-SW-C-8470 00 KAIG3-RFI-SW-C-8470-00
KAIG3-RFI-SW-C-8469 00 KAIG3-RFI-SW-C-8469-00
KAIG3-RFI-SW-C-8468 00 KAIG3-RFI-SW-C-8468-00
KAIG3-RFI-SW-C-8467 00 KAIG3-RFI-SW-C-8467-00
KAIG3-RFI-SW-C-8466 00 KAIG3-RFI-SW-C-8466-00
KAIG3-RFI-SW-C-8465 00 KAIG3-RFI-SW-C-8465-00
KAIG3-RFI-SW-C-8464 00 KAIG3-RFI-SW-C-8464-00
KAIG3-RFI-SW-C-8447 00 KAIG3-RFI-SW-C-8447-00
KAIG3-RFI-PA-LS-1618 01 KAIG3-RFI-PA-LS-1618-01
KAIG3-RFI-SW-C-8463 00 KAIG3-RFI-SW-C-8463-00
KAIG3-RFI-SW-C-8462 00 KAIG3-RFI-SW-C-8462-00
KAIG3-RFI-SW-C-8460 00 KAIG3-RFI-SW-C-8460-00
KAIG3-RFI-SW-C-8450 00 KAIG3-RFI-SW-C-8450-00
KAIG3-RFI-SW-C-8449 00 KAIG3-RFI-SW-C-8449-00
KAIG3-RFI-SW-C-8448 00 KAIG3-RFI-SW-C-8448-00
KAIG3-RFI-SW-C-8446 00 KAIG3-RFI-SW-C-8446-00
KAIG3-RFI-SW-C-8445 00 KAIG3-RFI-SW-C-8445-00
KAIG3-RFI-SW-C-8444 00 KAIG3-RFI-SW-C-8444-00
KAIG3-RFI-SW-C-8443 00 KAIG3-RFI-SW-C-8443-00
KAIG3-RFI-SW-C-8442 00 KAIG3-RFI-SW-C-8442-00
KAIG3-RFI-SW-C-8441 00 KAIG3-RFI-SW-C-8441-00
KAIG3-RFI-SW-C-8440 00 KAIG3-RFI-SW-C-8440-00
KAIG3-RFI-SW-C-8439 00 KAIG3-RFI-SW-C-8439-00
KAIG3-RFI-CO-A-1210 00 KAIG3-RFI-CO-A-1210-00
KAIG3-RFI-SW-C-8425 00 KAIG3-RFI-SW-C-8425-00
KAIG3-RFI-SW-C-8424 00 KAIG3-RFI-SW-C-8424-00
KAIG3-RFI-SW-C-8423 00 KAIG3-RFI-SW-C-8423-00
KAIG3-RFI-SW-C-8421 00 KAIG3-RFI-SW-C-8421-00
KAIG3-RFI-SW-LS-1702 00 KAIG3-RFI-SW-LS-1702-00
KAIG3-RFI-PA-LS-1701 00 KAIG3-RFI-PA-LS-1701-00
KAIG3-RFI-PA-LS-1700 00 KAIG3-RFI-PA-LS-1700-00
KAIG3-RFI-CO-S-9781 00 KAIG3-RFI-CO-S-9781-00
KAIG3-RFI-CO-S-9780 00 KAIG3-RFI-CO-S-9780-00
KAIG3-RFI-PG-C-8452 00 KAIG3-RFI-PG-C-8452-00
KAIG3-RFI-PG-C-8451 00 KAIG3-RFI-PG-C-8451-00
KAIG3-RFI-PG-S-9903 00 KAIG3-RFI-PG-S-9903-00
KAIG3-RFI-WG-A-1220 00 KAIG3-RFI-WG-A-1220-00
KAIG3-RFI-AG-A-1219 00 KAIG3-RFI-AG-A-1219-00
KAIG3-RFI-CO-A-1205 00 KAIG3-RFI-CO-A-1205-00
KAIG3-RFI-AG-A-1218 00 KAIG3-RFI-AG-A-1218-00
KAIG3-RFI-CO-A-1206 00 KAIG3-RFI-CO-A-1206-00
KAIG3-RFI-EC-C-8226 01 KAIG3-RFI-EC-C-8226-01
KAIG3-RFI-CO-C-8456 00 KAIG3-RFI-CO-C-8456-00
KAIG3-RFI-CO-C-8457 00 KAIG3-RFI-CO-C-8457-00
KAIG3-RFI-CO-C-8455 00 KAIG3-RFI-CO-C-8455-00
KAIG3-RFI-CO-C-8454 00 KAIG3-RFI-CO-C-8454-00
KAIG3-RFI-CO-C-8453 00 KAIG3-RFI-CO-C-8453-00
KAIG3-RFI-CO-SU-3197 00 KAIG3-RFI-CO-SU-3197-00
KAIG3-RFI-CO-SU-3201 00 KAIG3-RFI-CO-SU-3201-00
KAIG3-RFI-CO-SU-3202 00 KAIG3-RFI-CO-SU-3202-00
KAIG3-RFI-CO-SU-3199 00 KAIG3-RFI-CO-SU-3199-00
KAIG3-RFI-MC-SU-3196 00 KAIG3-RFI-MC-SU-3196-00
KAIG3-RFI-CO-S-9909 00 KAIG3-RFI-CO-S-9909-00
KAIG3-RFI-CO-S-9906 00 KAIG3-RFI-CO-S-9906-00
KAIG3-RFI-CO-S-9907 00 KAIG3-RFI-CO-S-9907-00
KAIG3-RFI-CO-S-9900 00 KAIG3-RFI-CO-S-9900-00
KAIG3-RFI-CO-S-9902 00 KAIG3-RFI-CO-S-9902-00
KAIG3-RFI-CO-S-9901 00 KAIG3-RFI-CO-S-9901-00
KAIG3-RFI-CO-S-9825 00 KAIG3-RFI-CO-S-9825-00
KAIG3-RFI-CO-S-9904 00 KAIG3-RFI-CO-S-9904-00
KAIG3-RFI-SM-S-9905 00 KAIG3-RFI-SM-S-9905-00
KAIG3-RFI-CO-S-9898 00 KAIG3-RFI-CO-S-9898-00
KAIG3-RFI-CO-S-9899 00 KAIG3-RFI-CO-S-9899-00
KAIG3-RFI-LM-S-9894 00 KAIG3-RFI-LM-S-9894-00
KAIG3-RFI-LM-S-9895 00 KAIG3-RFI-LM-S-9895-00
KAIG3-RFI-LM-S-9896 00 KAIG3-RFI-LM-S-9896-00
KAIG3-RFI-MC-S-9888 00 KAIG3-RFI-MC-S-9888-00
KAIG3-RFI-MC-S-9889 00 KAIG3-RFI-MC-S-9889-00
KAIG3-RFI-MC-S-9890 00 KAIG3-RFI-MC-S-9890-00
KAIG3-RFI-CO-S-9891 00 KAIG3-RFI-CO-S-9891-00
KAIG3-RFI-CO-S-9893 00 KAIG3-RFI-CO-S-9893-00
KAIG3-RFI-CO-S-9892 00 KAIG3-RFI-CO-S-9892-00
KAIG3-RFI-CO-S-9834 00 KAIG3-RFI-CO-S-9834-00
KAIG3-RFI-CO-S-9836 00 KAIG3-RFI-CO-S-9836-00
KAIG3-RFI-CC-S-9852 00 KAIG3-RFI-CC-S-9852-00
KAIG3-RFI-CC-S-9853 00 KAIG3-RFI-CC-S-9853-00
KAIG3-RFI-CC-SU-3189 00 KAIG3-RFI-CC-SU-3189-00
KAIG3-RFI-CO-S-9826 00 KAIG3-RFI-CO-S-9826-00
KAIG3-RFI-CO-S-9839 00 KAIG3-RFI-CO-S-9839-00
KAIG3-RFI-CO-SU-3185 00 KAIG3-RFI-CO-SU-3185-00
KAIG3-RFI-EC-SU-3186 00 KAIG3-RFI-EC-SU-3186-00
KAIG3-RFI-SR-LC-0861 00 KAIG3-RFI-SR-LC-0861-00
KAIG3-RFI-EC-SU-3187 00 KAIG3-RFI-EC-SU-3187-00
KAIG3-RFI-CO-SU-3188 00 KAIG3-RFI-CO-SU-3188-00
KAIG3-RFI-SW-E-0624 00 KAIG3-RFI-SW-E-0624-00
KAIG3-RFI-CO-C-8409 00 KAIG3-RFI-CO-C-8409-00
KAIG3-RFI-CO-C-8410 00 KAIG3-RFI-CO-C-8410-00
KAIG3-RFI-CO-C-8412 00 KAIG3-RFI-CO-C-8412-00
KAIG3-RFI-CO-C-8388 00 KAIG3-RFI-CO-C-8388-00
KAIG3-RFI-CO-C-8387 00 KAIG3-RFI-CO-C-8387-00
KAIG3-RFI-CO-C-8385 00 KAIG3-RFI-CO-C-8385-00
KAIG3-RFI-CO-C-8386 00 KAIG3-RFI-CO-C-8386-00
KAIG3-RFI-CO-C-8389 00 KAIG3-RFI-CO-C-8389-00
KAIG3-RFI-CO-C-8411 00 KAIG3-RFI-CO-C-8411-00
KAIG3-RFI-VG-C-8330 01 KAIG3-RFI-VG-C-8330-01
KAIG3-RFI-VG-C-8428 00 KAIG3-RFI-VG-C-8428-00
KAIG3-RFI-JG-C-8429 00 KAIG3-RFI-JG-C-8429-00
KAIG3-RFI-MC-SU-3182 00 KAIG3-RFI-MC-SU-3182-00
KAIG3-RFI-MC-S-9823 00 KAIG3-RFI-MC-S-9823-00
KAIG3-RFI-MC-S-9822 00 KAIG3-RFI-MC-S-9822-00
KAIG3-RFI-MC-S-9821 00 KAIG3-RFI-MC-S-9821-00
KAIG3-RFI-LM-S-9813 00 KAIG3-RFI-LM-S-9813-00
KAIG3-RFI-CO-A-1119 00 KAIG3-RFI-CO-A-1119-00
KAIG3-RFI-EC-S-9812 00 KAIG3-RFI-EC-S-9812-00
KAIG3-RFI-CO-S-9824 00 KAIG3-RFI-CO-S-9824-00
KAIG3-RFI-CO-S-9810 00 KAIG3-RFI-CO-S-9810-00
KAIG3-RFI-CO-S-9814 00 KAIG3-RFI-CO-S-9814-00
KAIG3-RFI-CC-S-9816 00 KAIG3-RFI-CC-S-9816-00
KAIG3-RFI-CO-S-9817 00 KAIG3-RFI-CO-S-9817-00
KAIG3-RFI-CO-S-9818 00 KAIG3-RFI-CO-S-9818-00
KAIG3-RFI-CO-S-8928 01 KAIG3-RFI-CO-S-8928-01
KAIG3-RFI-LM-SU-3180 00 KAIG3-RFI-LM-SU-3180-00
KAIG3-RFI-CO-SU-3183 00 KAIG3-RFI-CO-SU-3183-00
KAIG3-RFI-EC-SU-3179 00 KAIG3-RFI-EC-SU-3179-00
KAIG3-RFI-CO-A-1217 00 KAIG3-RFI-CO-A-1217-00
KAIG3-RFI-CO-SU-3181 00 KAIG3-RFI-CO-SU-3181-00
KAIG3-RFI-CO-A-1209 00 KAIG3-RFI-CO-A-1209-00
KAIG3-RFI-CO-SU-3178 00 KAIG3-RFI-CO-SU-3178-00
KAIG3-RFI-CO-A-1214 00 KAIG3-RFI-CO-A-1214-00
KAIG3-RFI-CO-A-1213 00 KAIG3-RFI-CO-A-1213-00
KAIG3-RFI-CO-SU-2962 01 KAIG3-RFI-CO-SU-2962-01
KAIG3-RFI-CO-A-1212 00 KAIG3-RFI-CO-A-1212-00
KAIG3-RFI-CO-A-1211 00 KAIG3-RFI-CO-A-1211-00
KAIG3-RFI-CO-SU-3177 00 KAIG3-RFI-CO-SU-3177-00
KAIG3-RFI-CO-A-1202 00 KAIG3-RFI-CO-A-1202-00
KAIG3-RFI-CO-A-1203 00 KAIG3-RFI-CO-A-1203-00
KAIG3-RFI-CO-A-1201 00 KAIG3-RFI-CO-A-1201-00
KAIG3-RFI-CO-A-1191 00 KAIG3-RFI-CO-A-1191-00
KAIG3-RFI-CO-A-1192 00 KAIG3-RFI-CO-A-1192-00
KAIG3-RFI-CO-A-1193 00 KAIG3-RFI-CO-A-1193-00
KAIG3-RFI-CO-A-1194 00 KAIG3-RFI-CO-A-1194-00
KAIG3-RFI-CO-A-1196 00 KAIG3-RFI-CO-A-1196-00
KAIG3-RFI-CO-A-1195 00 KAIG3-RFI-CO-A-1195-00
KAIG3-RFI-CO-A-1197 00 KAIG3-RFI-CO-A-1197-00
KAIG3-RFI-CO-A-1188 00 KAIG3-RFI-CO-A-1188-00
KAIG3-RFI-TT-E-0623 00 KAIG3-RFI-TT-E-0623-00
KAIG3-RFI-CO-A-1096 00 KAIG3-RFI-CO-A-1096-00
KAIG3-RFI-TT-E-0622 00 KAIG3-RFI-TT-E-0622-00
KAIG3-RFI-CO-S-9819 00 KAIG3-RFI-CO-S-9819-00
KAIG3-RFI-CO-S-9820 00 KAIG3-RFI-CO-S-9820-00
KAIG3-RFI-SW-E-0621 00 KAIG3-RFI-SW-E-0621-00
KAIG3-RFI-CO-A-1189 00 KAIG3-RFI-CO-A-1189-00
KAIG3-RFI-CO-S-9807 00 KAIG3-RFI-CO-S-9807-00
KAIG3-RFI-CO-S-9808 00 KAIG3-RFI-CO-S-9808-00
KAIG3-RFI-CO-A-1187 00 KAIG3-RFI-CO-A-1187-00
KAIG3-RFI-CF-LC-0860 00 KAIG3-RFI-CF-LC-0860-00
KAIG3-RFI-CF-LC-0859 00 KAIG3-RFI-CF-LC-0859-00
KAIG3-RFI-SW-M-0340 00 KAIG3-RFI-SW-M-0340-00
KAIG3-RFI-SW-M-0339 00 KAIG3-RFI-SW-M-0339-00
KAIG3-RFI-CO-SU-3191 00 KAIG3-RFI-CO-SU-3191-00
KAIG3-RFI-CO-SU-3192 00 KAIG3-RFI-CO-SU-3192-00
KAIG3-RFI-VG-C-8172 01 KAIG3-RFI-VG-C-8172-01
KAIG3-RFI-LM-SU-3184 00 KAIG3-RFI-LM-SU-3184-00
KAIG3-RFI-CO-S-9854 00 KAIG3-RFI-CO-S-9854-00
KAIG3-RFI-CO-C-8372 00 KAIG3-RFI-CO-C-8372-00
KAIG3-RFI-CO-S-9855 00 KAIG3-RFI-CO-S-9855-00
KAIG3-RFI-CO-C-8373 00 KAIG3-RFI-CO-C-8373-00
KAIG3-RFI-CO-S-9860 00 KAIG3-RFI-CO-S-9860-00
KAIG3-RFI-CO-S-9861 00 KAIG3-RFI-CO-S-9861-00
KAIG3-RFI-CO-C-8374 00 KAIG3-RFI-CO-C-8374-00
KAIG3-RFI-EC-S-9862 00 KAIG3-RFI-EC-S-9862-00
KAIG3-RFI-EC-S-9863 00 KAIG3-RFI-EC-S-9863-00
KAIG3-RFI-ST-S-9864 00 KAIG3-RFI-ST-S-9864-00
KAIG3-RFI-CO-C-8375 00 KAIG3-RFI-CO-C-8375-00
KAIG3-RFI-CO-S-9865 00 KAIG3-RFI-CO-S-9865-00
KAIG3-RFI-EC-C-8376 00 KAIG3-RFI-EC-C-8376-00
KAIG3-RFI-MC-S-9866 00 KAIG3-RFI-MC-S-9866-00
KAIG3-RFI-CO-S-9867 00 KAIG3-RFI-CO-S-9867-00
KAIG3-RFI-CO-S-9868 00 KAIG3-RFI-CO-S-9868-00
KAIG3-RFI-LM-S-9842 00 KAIG3-RFI-LM-S-9842-00
KAIG3-RFI-NA-S-9803 00 KAIG3-RFI-NA-S-9803-00
KAIG3-RFI-CF-S-9698 00 KAIG3-RFI-CF-S-9698-00
KAIG3-RFI-CO-S-9801 00 KAIG3-RFI-CO-S-9801-00
KAIG3-RFI-CO-S-9815 00 KAIG3-RFI-CO-S-9815-00
KAIG3-RFI-CO-S-9811 00 KAIG3-RFI-CO-S-9811-00
KAIG3-RFI-CO-S-9809 00 KAIG3-RFI-CO-S-9809-00
KAIG3-RFI-CF-S-9274 00 KAIG3-RFI-CF-S-9274-00
KAIG3-RFI-VG-C-8483 00 KAIG3-RFI-VG-C-8483-00
KAIG3-RFI-CO-C-8434 00 KAIG3-RFI-CO-C-8434-00
KAIG3-RFI-CO-C-8433 00 KAIG3-RFI-CO-C-8433-00
KAIG3-RFI-CO-C-8432 00 KAIG3-RFI-CO-C-8432-00
KAIG3-RFI-CO-C-8431 00 KAIG3-RFI-CO-C-8431-00
KAIG3-RFI-CO-SU-3195 00 KAIG3-RFI-CO-SU-3195-00
KAIG3-RFI-EC-S-9805 00 KAIG3-RFI-EC-S-9805-00
KAIG3-RFI-CO-SU-3194 00 KAIG3-RFI-CO-SU-3194-00
KAIG3-RFI-EC-S-9806 00 KAIG3-RFI-EC-S-9806-00
KAIG3-RFI-CO-S-9760 00 KAIG3-RFI-CO-S-9760-00
KAIG3-RFI-CO-S-9759 00 KAIG3-RFI-CO-S-9759-00
KAIG3-RFI-CO-S-9796 00 KAIG3-RFI-CO-S-9796-00
KAIG3-RFI-CO-S-9798 00 KAIG3-RFI-CO-S-9798-00
KAIG3-RFI-CO-S-9797 00 KAIG3-RFI-CO-S-9797-00
KAIG3-RFI-CO-S-9799 00 KAIG3-RFI-CO-S-9799-00
KAIG3-RFI-CO-S-9758 00 KAIG3-RFI-CO-S-9758-00
KAIG3-RFI-CO-SS-0450 00 KAIG3-RFI-CO-SS-0450-00
KAIG3-RFI-CO-S-9882 00 KAIG3-RFI-CO-S-9882-00
KAIG3-RFI-CO-S-9800 00 KAIG3-RFI-CO-S-9800-00
KAIG3-RFI-CO-S-9795 00 KAIG3-RFI-CO-S-9795-00
KAIG3-RFI-CO-S-9794 00 KAIG3-RFI-CO-S-9794-00
KAIG3-RFI-TG-LS-1699 00 KAIG3-RFI-TG-LS-1699-00
KAIG3-RFI-CO-S-9793 00 KAIG3-RFI-CO-S-9793-00
KAIG3-RFI-TG-LS-1698 00 KAIG3-RFI-TG-LS-1698-00
KAIG3-RFI-CO-S-9792 00 KAIG3-RFI-CO-S-9792-00
KAIG3-RFI-SG-S-6908 01 KAIG3-RFI-SG-S-6908-01
KAIG3-RFI-WG-S-9887 00 KAIG3-RFI-WG-S-9887-00
KAIG3-RFI-CO-S-9881 00 KAIG3-RFI-CO-S-9881-00
KAIG3-RFI-CO-S-9880 00 KAIG3-RFI-CO-S-9880-00
KAIG3-RFI-DG-S-9886 00 KAIG3-RFI-DG-S-9886-00
KAIG3-RFI-DG-S-9885 00 KAIG3-RFI-DG-S-9885-00
KAIG3-RFI-CO-S-9877 00 KAIG3-RFI-CO-S-9877-00
KAIG3-RFI-WG-S-9884 00 KAIG3-RFI-WG-S-9884-00
KAIG3-RFI-CF-SU-3145 00 KAIG3-RFI-CF-SU-3145-00
KAIG3-RFI-BO-E-0507 02 KAIG3-RFI-BO-E-0507-02
KAIG3-RFI-EC-SU-3174 00 KAIG3-RFI-EC-SU-3174-00
KAIG3-RFI-EC-SU-3175 00 KAIG3-RFI-EC-SU-3175-00
KAIG3-RFI-CO-SU-3176 00 KAIG3-RFI-CO-SU-3176-00
KAIG3-RFI-CO-SU-3169 00 KAIG3-RFI-CO-SU-3169-00
KAIG3-RFI-CO-S-9878 00 KAIG3-RFI-CO-S-9878-00
KAIG3-RFI-CO-SU-3170 00 KAIG3-RFI-CO-SU-3170-00
KAIG3-RFI-CO-S-9879 00 KAIG3-RFI-CO-S-9879-00
KAIG3-RFI-CO-SU-3171 00 KAIG3-RFI-CO-SU-3171-00
KAIG3-RFI-CO-S-9762 00 KAIG3-RFI-CO-S-9762-00
KAIG3-RFI-CO-SU-3168 00 KAIG3-RFI-CO-SU-3168-00
KAIG3-RFI-CO-S-9841 00 KAIG3-RFI-CO-S-9841-00
KAIG3-RFI-CO-SU-3167 00 KAIG3-RFI-CO-SU-3167-00
KAIG3-RFI-VG-S-9870 00 KAIG3-RFI-VG-S-9870-00
KAIG3-RFI-NA-SU-3172 00 KAIG3-RFI-NA-SU-3172-00
KAIG3-RFI-CO-S-9869 00 KAIG3-RFI-CO-S-9869-00
KAIG3-RFI-VG-S-9871 00 KAIG3-RFI-VG-S-9871-00
KAIG3-RFI-MC-S-9874 00 KAIG3-RFI-MC-S-9874-00
KAIG3-RFI-CO-SU-3165 00 KAIG3-RFI-CO-SU-3165-00
KAIG3-RFI-CC-SU-3163 00 KAIG3-RFI-CC-SU-3163-00
KAIG3-RFI-CO-SU-3161 00 KAIG3-RFI-CO-SU-3161-00
KAIG3-RFI-CO-C-8332 00 KAIG3-RFI-CO-C-8332-00
KAIG3-RFI-CO-C-8314 00 KAIG3-RFI-CO-C-8314-00
KAIG3-RFI-CO-S-9788 00 KAIG3-RFI-CO-S-9788-00
KAIG3-RFI-CO-S-9789 00 KAIG3-RFI-CO-S-9789-00
KAIG3-RFI-MC-S-9767 00 KAIG3-RFI-MC-S-9767-00
KAIG3-RFI-CO-S-9787 00 KAIG3-RFI-CO-S-9787-00
KAIG3-RFI-CO-S-9840 00 KAIG3-RFI-CO-S-9840-00
KAIG3-RFI-EC-S-9843 00 KAIG3-RFI-EC-S-9843-00
KAIG3-RFI-EC-S-9844 00 KAIG3-RFI-EC-S-9844-00
KAIG3-RFI-CO-S-9847 00 KAIG3-RFI-CO-S-9847-00
KAIG3-RFI-CF-S-9851 00 KAIG3-RFI-CF-S-9851-00
KAIG3-RFI-CO-S-9848 00 KAIG3-RFI-CO-S-9848-00
KAIG3-RFI-VG-S-9829 00 KAIG3-RFI-VG-S-9829-00
KAIG3-RFI-CO-A-1186 00 KAIG3-RFI-CO-A-1186-00
KAIG3-RFI-CO-S-9830 00 KAIG3-RFI-CO-S-9830-00
KAIG3-RFI-CO-S-9831 00 KAIG3-RFI-CO-S-9831-00
KAIG3-RFI-CO-S-9833 00 KAIG3-RFI-CO-S-9833-00
KAIG3-RFI-ZG-S-9859 00 KAIG3-RFI-ZG-S-9859-00
KAIG3-RFI-CO-S-9832 00 KAIG3-RFI-CO-S-9832-00
KAIG3-RFI-SW-C-5491 01 KAIG3-RFI-SW-C-5491-01
KAIG3-RFI-ZG-S-9858 00 KAIG3-RFI-ZG-S-9858-00
KAIG3-RFI-AG-A-1208 00 KAIG3-RFI-AG-A-1208-00
KAIG3-RFI-WG-A-1207 00 KAIG3-RFI-WG-A-1207-00
KAIG3-RFI-PG-C-8437 00 KAIG3-RFI-PG-C-8437-00
KAIG3-RFI-WG-C-8436 00 KAIG3-RFI-WG-C-8436-00
KAIG3-RFI-PG-C-8435 00 KAIG3-RFI-PG-C-8435-00
KAIG3-RFI-WG-C-8430 00 KAIG3-RFI-WG-C-8430-00
KAIG3-RFI-PC-P-0338 00 KAIG3-RFI-PC-P-0338-00
KAIG3-RFI-PC-P-0337 00 KAIG3-RFI-PC-P-0337-00
KAIG3-RFI-SW-C-8422 00 KAIG3-RFI-SW-C-8422-00
KAIG3-RFI-SW-C-8420 00 KAIG3-RFI-SW-C-8420-00
KAIG3-RFI-SW-C-8419 00 KAIG3-RFI-SW-C-8419-00
KAIG3-RFI-SW-C-8285 01 KAIG3-RFI-SW-C-8285-01
KAIG3-RFI-SW-C-8182 01 KAIG3-RFI-SW-C-8182-01
KAIG3-RFI-MB-A-1204 00 KAIG3-RFI-MB-A-1204-00
KAIG3-RFI-TT-A-1200 00 KAIG3-RFI-TT-A-1200-00
KAIG3-RFI-PA-LS-1697 00 KAIG3-RFI-PA-LS-1697-00
KAIG3-RFI-PG-S-9857 00 KAIG3-RFI-PG-S-9857-00
KAIG3-RFI-PG-S-9856 00 KAIG3-RFI-PG-S-9856-00
KAIG3-RFI-TG-LS-1690 00 KAIG3-RFI-TG-LS-1690-00
KAIG3-RFI-PA-LS-1696 00 KAIG3-RFI-PA-LS-1696-00
KAIG3-RFI-WG-C-8418 00 KAIG3-RFI-WG-C-8418-00
KAIG3-RFI-WG-C-8417 00 KAIG3-RFI-WG-C-8417-00
KAIG3-RFI-WG-C-8416 00 KAIG3-RFI-WG-C-8416-00
KAIG3-RFI-WG-C-8415 00 KAIG3-RFI-WG-C-8415-00
KAIG3-RFI-SW-C-8365 00 KAIG3-RFI-SW-C-8365-00
KAIG3-RFI-SW-C-8359 00 KAIG3-RFI-SW-C-8359-00
KAIG3-RFI-SW-C-8325 00 KAIG3-RFI-SW-C-8325-00
KAIG3-RFI-PC-S-9436 00 KAIG3-RFI-PC-S-9436-00
KAIG3-RFI-CO-SU-3160 00 KAIG3-RFI-CO-SU-3160-00
KAIG3-RFI-CC-S-9725 00 KAIG3-RFI-CC-S-9725-00
KAIG3-RFI-CO-C-8326 00 KAIG3-RFI-CO-C-8326-00
KAIG3-RFI-CO-S-9775 00 KAIG3-RFI-CO-S-9775-00
KAIG3-RFI-SW-LS-1695 00 KAIG3-RFI-SW-LS-1695-00
KAIG3-RFI-SW-LS-1694 00 KAIG3-RFI-SW-LS-1694-00
KAIG3-RFI-SW-LS-1693 00 KAIG3-RFI-SW-LS-1693-00
KAIG3-RFI-SW-LS-1692 00 KAIG3-RFI-SW-LS-1692-00
KAIG3-RFI-PA-LS-1691 00 KAIG3-RFI-PA-LS-1691-00
KAIG3-RFI-SW-C-8405 00 KAIG3-RFI-SW-C-8405-00
KAIG3-RFI-SW-C-8404 00 KAIG3-RFI-SW-C-8404-00
KAIG3-RFI-SW-C-8403 00 KAIG3-RFI-SW-C-8403-00
KAIG3-RFI-SW-C-8402 00 KAIG3-RFI-SW-C-8402-00
KAIG3-RFI-SW-C-8401 00 KAIG3-RFI-SW-C-8401-00
KAIG3-RFI-CO-S-8754 01 KAIG3-RFI-CO-S-8754-01
KAIG3-RFI-CO-S-8340 01 KAIG3-RFI-CO-S-8340-01
KAIG3-RFI-SW-C-8427 00 KAIG3-RFI-SW-C-8427-00
KAIG3-RFI-SW-C-8426 00 KAIG3-RFI-SW-C-8426-00
KAIG3-RFI-PG-LS-1689 00 KAIG3-RFI-PG-LS-1689-00
KAIG3-RFI-PG-LC-0848 00 KAIG3-RFI-PG-LC-0848-00
KAIG3-RFI-PG-LC-0847 00 KAIG3-RFI-PG-LC-0847-00
KAIG3-RFI-TT-LC-0809 00 KAIG3-RFI-TT-LC-0809-00
KAIG3-RFI-TT-LC-0808 00 KAIG3-RFI-TT-LC-0808-00
KAIG3-RFI-CC-LC-0856 00 KAIG3-RFI-CC-LC-0856-00
KAIG3-RFI-SR-LC-0855 00 KAIG3-RFI-SR-LC-0855-00
KAIG3-RFI-CC-LC-0842 00 KAIG3-RFI-CC-LC-0842-00
KAIG3-RFI-NA-LC-0846 01 KAIG3-RFI-NA-LC-0846-01
KAIG3-RFI-TT-E-0560 01 KAIG3-RFI-TT-E-0560-01
KAIG3-RFI-TT-E-0559 01 KAIG3-RFI-TT-E-0559-01
KAIG3-RFI-PC-E-0619 00 KAIG3-RFI-PC-E-0619-00
KAIG3-RFI-PC-P-0336 00 KAIG3-RFI-PC-P-0336-00
KAIG3-RFI-PC-LS-1687 00 KAIG3-RFI-PC-LS-1687-00
KAIG3-RFI-SW-LS-1688 00 KAIG3-RFI-SW-LS-1688-00
KAIG3-RFI-SW-C-8400 00 KAIG3-RFI-SW-C-8400-00
KAIG3-RFI-SW-C-8399 00 KAIG3-RFI-SW-C-8399-00
KAIG3-RFI-SW-C-8398 00 KAIG3-RFI-SW-C-8398-00
KAIG3-RFI-SW-C-8397 00 KAIG3-RFI-SW-C-8397-00
KAIG3-RFI-SW-C-8396 00 KAIG3-RFI-SW-C-8396-00
KAIG3-RFI-SW-C-8395 00 KAIG3-RFI-SW-C-8395-00
KAIG3-RFI-SW-C-8394 00 KAIG3-RFI-SW-C-8394-00
KAIG3-RFI-SW-C-8393 00 KAIG3-RFI-SW-C-8393-00
KAIG3-RFI-WG-C-8414 00 KAIG3-RFI-WG-C-8414-00
KAIG3-RFI-WG-C-8413 00 KAIG3-RFI-WG-C-8413-00
KAIG3-RFI-SW-C-8392 00 KAIG3-RFI-SW-C-8392-00
KAIG3-RFI-WG-C-8407 00 KAIG3-RFI-WG-C-8407-00
KAIG3-RFI-SW-C-8391 00 KAIG3-RFI-SW-C-8391-00
KAIG3-RFI-WG-C-8406 00 KAIG3-RFI-WG-C-8406-00
KAIG3-RFI-MB-S-9804 00 KAIG3-RFI-MB-S-9804-00
KAIG3-RFI-WG-SU-3190 00 KAIG3-RFI-WG-SU-3190-00
KAIG3-RFI-SW-C-8390 00 KAIG3-RFI-SW-C-8390-00
KAIG3-RFI-MB-SU-3173 00 KAIG3-RFI-MB-SU-3173-00
KAIG3-RFI-SW-E-0618 00 KAIG3-RFI-SW-E-0618-00
KAIG3-RFI-SW-C-8370 00 KAIG3-RFI-SW-C-8370-00
KAIG3-RFI-CC-E-0616 00 KAIG3-RFI-CC-E-0616-00
KAIG3-RFI-SW-C-8369 00 KAIG3-RFI-SW-C-8369-00
KAIG3-RFI-LM-E-0615 00 KAIG3-RFI-LM-E-0615-00
KAIG3-RFI-MB-A-1190 00 KAIG3-RFI-MB-A-1190-00
KAIG3-RFI-SW-C-8368 00 KAIG3-RFI-SW-C-8368-00
KAIG3-RFI-SW-S-9850 00 KAIG3-RFI-SW-S-9850-00
KAIG3-RFI-WG-E-0614 00 KAIG3-RFI-WG-E-0614-00
KAIG3-RFI-SW-S-9849 00 KAIG3-RFI-SW-S-9849-00
KAIG3-RFI-WG-E-0613 00 KAIG3-RFI-WG-E-0613-00
KAIG3-RFI-PA-LS-1686 00 KAIG3-RFI-PA-LS-1686-00
KAIG3-RFI-SW-E-0612 00 KAIG3-RFI-SW-E-0612-00
KAIG3-RFI-SW-LS-1685 00 KAIG3-RFI-SW-LS-1685-00
KAIG3-RFI-WG-S-9846 00 KAIG3-RFI-WG-S-9846-00
KAIG3-RFI-WG-S-9845 00 KAIG3-RFI-WG-S-9845-00
KAIG3-RFI-LM-LC-0854 00 KAIG3-RFI-LM-LC-0854-00
KAIG3-RFI-SW-C-8363 00 KAIG3-RFI-SW-C-8363-00
KAIG3-RFI-SW-C-8364 00 KAIG3-RFI-SW-C-8364-00
KAIG3-RFI-CO-S-7077 01 KAIG3-RFI-CO-S-7077-01
KAIG3-RFI-MB-E-0597 00 KAIG3-RFI-MB-E-0597-00
KAIG3-RFI-WG-E-0617 00 KAIG3-RFI-WG-E-0617-00
KAIG3-RFI-PG-E-0611 00 KAIG3-RFI-PG-E-0611-00
KAIG3-RFI-PG-E-0610 00 KAIG3-RFI-PG-E-0610-00
KAIG3-RFI-WG-C-8371 00 KAIG3-RFI-WG-C-8371-00
KAIG3-RFI-WG-LS-1678 00 KAIG3-RFI-WG-LS-1678-00
KAIG3-RFI-SW-LC-0853 00 KAIG3-RFI-SW-LC-0853-00
KAIG3-RFI-SW-LC-0852 00 KAIG3-RFI-SW-LC-0852-00
KAIG3-RFI-WG-LS-1680 00 KAIG3-RFI-WG-LS-1680-00
KAIG3-RFI-WG-LC-0851 00 KAIG3-RFI-WG-LC-0851-00
KAIG3-RFI-WG-LC-0850 00 KAIG3-RFI-WG-LC-0850-00
KAIG3-RFI-TG-LS-1684 00 KAIG3-RFI-TG-LS-1684-00
KAIG3-RFI-WG-C-8384 00 KAIG3-RFI-WG-C-8384-00
KAIG3-RFI-WG-C-8383 00 KAIG3-RFI-WG-C-8383-00
KAIG3-RFI-SW-C-8367 00 KAIG3-RFI-SW-C-8367-00
KAIG3-RFI-WG-C-8382 00 KAIG3-RFI-WG-C-8382-00
KAIG3-RFI-SW-C-8366 00 KAIG3-RFI-SW-C-8366-00
KAIG3-RFI-WG-C-8381 00 KAIG3-RFI-WG-C-8381-00
KAIG3-RFI-WG-C-8380 00 KAIG3-RFI-WG-C-8380-00
KAIG3-RFI-SW-LS-1683 00 KAIG3-RFI-SW-LS-1683-00
KAIG3-RFI-WG-C-8379 00 KAIG3-RFI-WG-C-8379-00
KAIG3-RFI-SW-LS-1682 00 KAIG3-RFI-SW-LS-1682-00
KAIG3-RFI-SW-LS-1681 00 KAIG3-RFI-SW-LS-1681-00
KAIG3-RFI-WG-C-8378 00 KAIG3-RFI-WG-C-8378-00
KAIG3-RFI-SW-LS-1677 00 KAIG3-RFI-SW-LS-1677-00
KAIG3-RFI-SW-C-8362 00 KAIG3-RFI-SW-C-8362-00
KAIG3-RFI-SW-C-8361 00 KAIG3-RFI-SW-C-8361-00
KAIG3-RFI-SW-C-8360 00 KAIG3-RFI-SW-C-8360-00
KAIG3-RFI-SW-C-8358 00 KAIG3-RFI-SW-C-8358-00
KAIG3-RFI-SW-C-8357 00 KAIG3-RFI-SW-C-8357-00
KAIG3-RFI-SW-C-8356 00 KAIG3-RFI-SW-C-8356-00
KAIG3-RFI-SW-C-8355 00 KAIG3-RFI-SW-C-8355-00
KAIG3-RFI-ZG-A-1185 00 KAIG3-RFI-ZG-A-1185-00
KAIG3-RFI-PG-A-1184 00 KAIG3-RFI-PG-A-1184-00
KAIG3-RFI-DG-A-1183 00 KAIG3-RFI-DG-A-1183-00
KAIG3-RFI-PG-S-9689 00 KAIG3-RFI-PG-S-9689-00
KAIG3-RFI-WG-S-9748 00 KAIG3-RFI-WG-S-9748-00
KAIG3-RFI-WG-C-8377 00 KAIG3-RFI-WG-C-8377-00
KAIG3-RFI-PG-C-8353 00 KAIG3-RFI-PG-C-8353-00
KAIG3-RFI-PG-C-8352 00 KAIG3-RFI-PG-C-8352-00
KAIG3-RFI-PG-C-8312 00 KAIG3-RFI-PG-C-8312-00
KAIG3-RFI-DG-S-9709 00 KAIG3-RFI-DG-S-9709-00
KAIG3-RFI-ZG-S-9749 00 KAIG3-RFI-ZG-S-9749-00
KAIG3-RFI-PG-C-8351 00 KAIG3-RFI-PG-C-8351-00
KAIG3-RFI-WG-C-8348 00 KAIG3-RFI-WG-C-8348-00
KAIG3-RFI-WG-C-8347 00 KAIG3-RFI-WG-C-8347-00
KAIG3-RFI-WG-LS-1672 00 KAIG3-RFI-WG-LS-1672-00
KAIG3-RFI-MB-A-1181 00 KAIG3-RFI-MB-A-1181-00
KAIG3-RFI-ZG-A-1180 00 KAIG3-RFI-ZG-A-1180-00
KAIG3-RFI-NA-LC-0849 00 KAIG3-RFI-NA-LC-0849-00
KAIG3-RFI-PG-A-1179 00 KAIG3-RFI-PG-A-1179-00
KAIG3-RFI-NA-LC-0846 00 KAIG3-RFI-NA-LC-0846-00
KAIG3-RFI-CC-LC-0845 00 KAIG3-RFI-CC-LC-0845-00
KAIG3-RFI-CC-LC-0844 00 KAIG3-RFI-CC-LC-0844-00
KAIG3-RFI-DG-A-1178 00 KAIG3-RFI-DG-A-1178-00
KAIG3-RFI-CC-LC-0843 00 KAIG3-RFI-CC-LC-0843-00
KAIG3-RFI-AG-A-1177 00 KAIG3-RFI-AG-A-1177-00
KAIG3-RFI-AG-A-1176 00 KAIG3-RFI-AG-A-1176-00
KAIG3-RFI-MB-A-1175 00 KAIG3-RFI-MB-A-1175-00
KAIG3-RFI-EC-A-1182 00 KAIG3-RFI-EC-A-1182-00
KAIG3-RFI-CO-C-8350 00 KAIG3-RFI-CO-C-8350-00
KAIG3-RFI-CO-SU-3166 00 KAIG3-RFI-CO-SU-3166-00
KAIG3-RFI-EC-S-9791 00 KAIG3-RFI-EC-S-9791-00
KAIG3-RFI-NT-S-9753 00 KAIG3-RFI-NT-S-9753-00
KAIG3-RFI-CO-S-9778 00 KAIG3-RFI-CO-S-9778-00
KAIG3-RFI-CO-S-9776 00 KAIG3-RFI-CO-S-9776-00
KAIG3-RFI-CO-S-9777 00 KAIG3-RFI-CO-S-9777-00
KAIG3-RFI-CO-S-9782 00 KAIG3-RFI-CO-S-9782-00
KAIG3-RFI-CO-S-9783 00 KAIG3-RFI-CO-S-9783-00
KAIG3-RFI-CO-S-9784 00 KAIG3-RFI-CO-S-9784-00
KAIG3-RFI-CC-S-9770 00 KAIG3-RFI-CC-S-9770-00
KAIG3-RFI-CO-S-9785 00 KAIG3-RFI-CO-S-9785-00
KAIG3-RFI-CO-S-9786 00 KAIG3-RFI-CO-S-9786-00
KAIG3-RFI-CO-S-9754 00 KAIG3-RFI-CO-S-9754-00
KAIG3-RFI-CO-S-9756 00 KAIG3-RFI-CO-S-9756-00
KAIG3-RFI-LM-S-9757 00 KAIG3-RFI-LM-S-9757-00
KAIG3-RFI-MC-S-9765 00 KAIG3-RFI-MC-S-9765-00
KAIG3-RFI-MC-S-9766 00 KAIG3-RFI-MC-S-9766-00
KAIG3-RFI-CO-S-9755 00 KAIG3-RFI-CO-S-9755-00
KAIG3-RFI-EC-S-9768 00 KAIG3-RFI-EC-S-9768-00
KAIG3-RFI-CC-S-9769 00 KAIG3-RFI-CC-S-9769-00
KAIG3-RFI-VG-S-9771 00 KAIG3-RFI-VG-S-9771-00
KAIG3-RFI-VG-S-9772 00 KAIG3-RFI-VG-S-9772-00
KAIG3-RFI-VG-S-9773 00 KAIG3-RFI-VG-S-9773-00
KAIG3-RFI-CO-S-9774 00 KAIG3-RFI-CO-S-9774-00
KAIG3-RFI-CO-SU-3164 00 KAIG3-RFI-CO-SU-3164-00
KAIG3-RFI-VG-C-8329 00 KAIG3-RFI-VG-C-8329-00
KAIG3-RFI-VG-C-8330 00 KAIG3-RFI-VG-C-8330-00
KAIG3-RFI-SW-C-8354 00 KAIG3-RFI-SW-C-8354-00
KAIG3-RFI-CO-C-8296 00 KAIG3-RFI-CO-C-8296-00
KAIG3-RFI-CO-C-8297 00 KAIG3-RFI-CO-C-8297-00
KAIG3-RFI-SW-C-8345 00 KAIG3-RFI-SW-C-8345-00
KAIG3-RFI-MC-C-8298 00 KAIG3-RFI-MC-C-8298-00
KAIG3-RFI-SW-C-8344 00 KAIG3-RFI-SW-C-8344-00
KAIG3-RFI-SW-C-8343 00 KAIG3-RFI-SW-C-8343-00
KAIG3-RFI-CO-C-8299 00 KAIG3-RFI-CO-C-8299-00
KAIG3-RFI-SW-C-8342 00 KAIG3-RFI-SW-C-8342-00
KAIG3-RFI-PA-C-8341 00 KAIG3-RFI-PA-C-8341-00
KAIG3-RFI-VG-S-9744 00 KAIG3-RFI-VG-S-9744-00
KAIG3-RFI-VG-S-9745 00 KAIG3-RFI-VG-S-9745-00
KAIG3-RFI-SW-C-8338 00 KAIG3-RFI-SW-C-8338-00
KAIG3-RFI-SW-C-8337 00 KAIG3-RFI-SW-C-8337-00
KAIG3-RFI-CO-SU-3158 00 KAIG3-RFI-CO-SU-3158-00
KAIG3-RFI-SW-C-8336 00 KAIG3-RFI-SW-C-8336-00
KAIG3-RFI-SW-C-8335 00 KAIG3-RFI-SW-C-8335-00
KAIG3-RFI-SW-C-8334 00 KAIG3-RFI-SW-C-8334-00
KAIG3-RFI-CO-S-9740 00 KAIG3-RFI-CO-S-9740-00
KAIG3-RFI-SW-C-8333 00 KAIG3-RFI-SW-C-8333-00
KAIG3-RFI-VG-S-9746 00 KAIG3-RFI-VG-S-9746-00
KAIG3-RFI-CO-S-9747 00 KAIG3-RFI-CO-S-9747-00
KAIG3-RFI-SW-C-8324 00 KAIG3-RFI-SW-C-8324-00
KAIG3-RFI-EC-S-9750 00 KAIG3-RFI-EC-S-9750-00
KAIG3-RFI-SW-C-8323 00 KAIG3-RFI-SW-C-8323-00
KAIG3-RFI-NT-S-9751 00 KAIG3-RFI-NT-S-9751-00
KAIG3-RFI-SW-C-8310 00 KAIG3-RFI-SW-C-8310-00
KAIG3-RFI-NT-S-9752 00 KAIG3-RFI-NT-S-9752-00
KAIG3-RFI-NT-SU-3159 00 KAIG3-RFI-NT-SU-3159-00
KAIG3-RFI-CO-A-1169 00 KAIG3-RFI-CO-A-1169-00
KAIG3-RFI-CO-A-1170 00 KAIG3-RFI-CO-A-1170-00
KAIG3-RFI-NA-S-9743 00 KAIG3-RFI-NA-S-9743-00
KAIG3-RFI-CO-S-8212 01 KAIG3-RFI-CO-S-8212-01
KAIG3-RFI-CO-S-8213 01 KAIG3-RFI-CO-S-8213-01
KAIG3-RFI-SW-M-0334 01 KAIG3-RFI-SW-M-0334-01
KAIG3-RFI-SW-C-8346 00 KAIG3-RFI-SW-C-8346-00
KAIG3-RFI-SW-LS-1674 00 KAIG3-RFI-SW-LS-1674-00
KAIG3-RFI-DG-LS-1669 00 KAIG3-RFI-DG-LS-1669-00
KAIG3-RFI-TG-LS-1668 00 KAIG3-RFI-TG-LS-1668-00
KAIG3-RFI-TG-LS-1667 00 KAIG3-RFI-TG-LS-1667-00
KAIG3-RFI-PG-C-8328 00 KAIG3-RFI-PG-C-8328-00
KAIG3-RFI-WG-C-8327 00 KAIG3-RFI-WG-C-8327-00
KAIG3-RFI-WG-C-8317 00 KAIG3-RFI-WG-C-8317-00
KAIG3-RFI-WG-C-8316 00 KAIG3-RFI-WG-C-8316-00
KAIG3-RFI-WG-C-8315 00 KAIG3-RFI-WG-C-8315-00
KAIG3-RFI-WG-S-9764 00 KAIG3-RFI-WG-S-9764-00
KAIG3-RFI-WG-S-9763 00 KAIG3-RFI-WG-S-9763-00
KAIG3-RFI-MB-A-1174 00 KAIG3-RFI-MB-A-1174-00
KAIG3-RFI-MB-A-1173 00 KAIG3-RFI-MB-A-1173-00
KAIG3-RFI-MB-A-1172 00 KAIG3-RFI-MB-A-1172-00
KAIG3-RFI-MB-A-1171 00 KAIG3-RFI-MB-A-1171-00
KAIG3-RFI-SW-C-8322 00 KAIG3-RFI-SW-C-8322-00
KAIG3-RFI-SW-C-8321 00 KAIG3-RFI-SW-C-8321-00
KAIG3-RFI-SW-C-8320 00 KAIG3-RFI-SW-C-8320-00
KAIG3-RFI-SW-C-8319 00 KAIG3-RFI-SW-C-8319-00
KAIG3-RFI-SW-C-8318 00 KAIG3-RFI-SW-C-8318-00
KAIG3-RFI-SW-C-8309 00 KAIG3-RFI-SW-C-8309-00
KAIG3-RFI-SW-C-8308 00 KAIG3-RFI-SW-C-8308-00
KAIG3-RFI-SW-C-8307 00 KAIG3-RFI-SW-C-8307-00
KAIG3-RFI-SW-C-8306 00 KAIG3-RFI-SW-C-8306-00
KAIG3-RFI-SW-C-8305 00 KAIG3-RFI-SW-C-8305-00
KAIG3-RFI-SW-C-8304 00 KAIG3-RFI-SW-C-8304-00
KAIG3-RFI-SW-C-8303 00 KAIG3-RFI-SW-C-8303-00
KAIG3-RFI-SW-C-8293 00 KAIG3-RFI-SW-C-8293-00
KAIG3-RFI-SW-C-8095 01 KAIG3-RFI-SW-C-8095-01
KAIG3-RFI-SW-C-8077 01 KAIG3-RFI-SW-C-8077-01
KAIG3-RFI-PA-LS-1673 00 KAIG3-RFI-PA-LS-1673-00
KAIG3-RFI-PA-LS-1671 00 KAIG3-RFI-PA-LS-1671-00
KAIG3-RFI-SW-LS-1670 00 KAIG3-RFI-SW-LS-1670-00
KAIG3-RFI-CO-A-1049 00 KAIG3-RFI-CO-A-1049-00
KAIG3-RFI-CO-A-1044 00 KAIG3-RFI-CO-A-1044-00
KAIG3-RFI-MB-LC-0805 00 KAIG3-RFI-MB-LC-0805-00
KAIG3-RFI-MB-LC-0804 00 KAIG3-RFI-MB-LC-0804-00
KAIG3-RFI-CO-A-1106 01 KAIG3-RFI-CO-A-1106-01
KAIG3-RFI-CO-A-1088 01 KAIG3-RFI-CO-A-1088-01
KAIG3-RFI-CO-A-1084 01 KAIG3-RFI-CO-A-1084-01
KAIG3-RFI-CC-LC-0841 00 KAIG3-RFI-CC-LC-0841-00
KAIG3-RFI-MB-S-9710 00 KAIG3-RFI-MB-S-9710-00
KAIG3-RFI-MB-A-1168 00 KAIG3-RFI-MB-A-1168-00
KAIG3-RFI-MB-A-1167 00 KAIG3-RFI-MB-A-1167-00
KAIG3-RFI-MB-A-1166 00 KAIG3-RFI-MB-A-1166-00
KAIG3-RFI-MB-A-1165 00 KAIG3-RFI-MB-A-1165-00
KAIG3-RFI-MB-A-1164 00 KAIG3-RFI-MB-A-1164-00
KAIG3-RFI-MB-A-1163 00 KAIG3-RFI-MB-A-1163-00
KAIG3-RFI-SW-LS-1666 00 KAIG3-RFI-SW-LS-1666-00
KAIG3-RFI-SW-LS-1665 00 KAIG3-RFI-SW-LS-1665-00
KAIG3-RFI-SW-LS-1664 00 KAIG3-RFI-SW-LS-1664-00
KAIG3-RFI-SW-C-8301 00 KAIG3-RFI-SW-C-8301-00
KAIG3-RFI-SW-C-8300 00 KAIG3-RFI-SW-C-8300-00
KAIG3-RFI-SW-C-8295 00 KAIG3-RFI-SW-C-8295-00
KAIG3-RFI-SW-C-8294 00 KAIG3-RFI-SW-C-8294-00
KAIG3-RFI-SW-C-8292 00 KAIG3-RFI-SW-C-8292-00
KAIG3-RFI-SW-C-8291 00 KAIG3-RFI-SW-C-8291-00
KAIG3-RFI-SW-C-8289 00 KAIG3-RFI-SW-C-8289-00
KAIG3-RFI-SW-C-8288 00 KAIG3-RFI-SW-C-8288-00
KAIG3-RFI-SW-C-8287 00 KAIG3-RFI-SW-C-8287-00
KAIG3-RFI-SW-C-8286 00 KAIG3-RFI-SW-C-8286-00
KAIG3-RFI-SW-C-8285 00 KAIG3-RFI-SW-C-8285-00
KAIG3-RFI-SW-C-8284 00 KAIG3-RFI-SW-C-8284-00
KAIG3-RFI-SW-C-8283 00 KAIG3-RFI-SW-C-8283-00
KAIG3-RFI-SW-C-8282 00 KAIG3-RFI-SW-C-8282-00
KAIG3-RFI-SW-C-8281 00 KAIG3-RFI-SW-C-8281-00
KAIG3-RFI-SW-C-8280 00 KAIG3-RFI-SW-C-8280-00
KAIG3-RFI-SW-M-0335 00 KAIG3-RFI-SW-M-0335-00
KAIG3-RFI-CC-E-0607 00 KAIG3-RFI-CC-E-0607-00
KAIG3-RFI-CO-S-8757 01 KAIG3-RFI-CO-S-8757-01
KAIG3-RFI-CO-SU-2956 00 KAIG3-RFI-CO-SU-2956-00
KAIG3-RFI-WG-C-8214 00 KAIG3-RFI-WG-C-8214-00
KAIG3-RFI-TG-LS-1662 00 KAIG3-RFI-TG-LS-1662-00
KAIG3-RFI-TG-LS-1661 00 KAIG3-RFI-TG-LS-1661-00
KAIG3-RFI-WG-S-9566 01 KAIG3-RFI-WG-S-9566-01
KAIG3-RFI-WG-S-9565 01 KAIG3-RFI-WG-S-9565-01
KAIG3-RFI-SW-C-8275 00 KAIG3-RFI-SW-C-8275-00
KAIG3-RFI-SW-C-8274 00 KAIG3-RFI-SW-C-8274-00
KAIG3-RFI-SW-C-8273 00 KAIG3-RFI-SW-C-8273-00
KAIG3-RFI-SW-C-8272 00 KAIG3-RFI-SW-C-8272-00
KAIG3-RFI-SW-C-8271 00 KAIG3-RFI-SW-C-8271-00
KAIG3-RFI-SW-C-8270 00 KAIG3-RFI-SW-C-8270-00
KAIG3-RFI-SW-C-8269 00 KAIG3-RFI-SW-C-8269-00
KAIG3-RFI-SW-C-8268 00 KAIG3-RFI-SW-C-8268-00
KAIG3-RFI-SW-C-8267 00 KAIG3-RFI-SW-C-8267-00
KAIG3-RFI-SW-C-8265 00 KAIG3-RFI-SW-C-8265-00
KAIG3-RFI-SW-C-8266 00 KAIG3-RFI-SW-C-8266-00
KAIG3-RFI-SW-C-8264 00 KAIG3-RFI-SW-C-8264-00
KAIG3-RFI-SW-C-8263 00 KAIG3-RFI-SW-C-8263-00
KAIG3-RFI-SW-C-8262 00 KAIG3-RFI-SW-C-8262-00
KAIG3-RFI-SW-C-8261 00 KAIG3-RFI-SW-C-8261-00
KAIG3-RFI-SW-C-8260 00 KAIG3-RFI-SW-C-8260-00
KAIG3-RFI-SW-C-8250 00 KAIG3-RFI-SW-C-8250-00
KAIG3-RFI-SW-C-8249 00 KAIG3-RFI-SW-C-8249-00
KAIG3-RFI-PA-LS-1660 00 KAIG3-RFI-PA-LS-1660-00
KAIG3-RFI-SW-LS-1659 00 KAIG3-RFI-SW-LS-1659-00
KAIG3-RFI-MC-C-8277 00 KAIG3-RFI-MC-C-8277-00
KAIG3-RFI-CO-C-8258 00 KAIG3-RFI-CO-C-8258-00
KAIG3-RFI-SM-SU-3154 00 KAIG3-RFI-SM-SU-3154-00
KAIG3-RFI-LM-S-9658 00 KAIG3-RFI-LM-S-9658-00
KAIG3-RFI-CO-S-9630 00 KAIG3-RFI-CO-S-9630-00
KAIG3-RFI-CO-A-1152 00 KAIG3-RFI-CO-A-1152-00
KAIG3-RFI-VG-C-8172 00 KAIG3-RFI-VG-C-8172-00
KAIG3-RFI-CO-C-8189 00 KAIG3-RFI-CO-C-8189-00
KAIG3-RFI-CO-SU-3136 00 KAIG3-RFI-CO-SU-3136-00
KAIG3-RFI-LM-S-9657 00 KAIG3-RFI-LM-S-9657-00
KAIG3-RFI-VG-S-9640 00 KAIG3-RFI-VG-S-9640-00
KAIG3-RFI-EC-A-1138 00 KAIG3-RFI-EC-A-1138-00
KAIG3-RFI-CO-S-9726 00 KAIG3-RFI-CO-S-9726-00
KAIG3-RFI-SM-S-9722 00 KAIG3-RFI-SM-S-9722-00
KAIG3-RFI-SM-S-9721 00 KAIG3-RFI-SM-S-9721-00
KAIG3-RFI-SM-S-9720 00 KAIG3-RFI-SM-S-9720-00
KAIG3-RFI-SM-S-9717 00 KAIG3-RFI-SM-S-9717-00
KAIG3-RFI-CO-S-9728 00 KAIG3-RFI-CO-S-9728-00
KAIG3-RFI-CO-S-9727 00 KAIG3-RFI-CO-S-9727-00
KAIG3-RFI-CO-S-9731 00 KAIG3-RFI-CO-S-9731-00
KAIG3-RFI-CO-S-9730 00 KAIG3-RFI-CO-S-9730-00
KAIG3-RFI-CO-S-9729 00 KAIG3-RFI-CO-S-9729-00
KAIG3-RFI-CO-S-9737 00 KAIG3-RFI-CO-S-9737-00
KAIG3-RFI-CO-S-9736 00 KAIG3-RFI-CO-S-9736-00
KAIG3-RFI-CO-S-9735 00 KAIG3-RFI-CO-S-9735-00
KAIG3-RFI-CO-S-9734 00 KAIG3-RFI-CO-S-9734-00
KAIG3-RFI-CO-S-9733 00 KAIG3-RFI-CO-S-9733-00
KAIG3-RFI-CO-S-9732 00 KAIG3-RFI-CO-S-9732-00
KAIG3-RFI-CO-S-9672 00 KAIG3-RFI-CO-S-9672-00
KAIG3-RFI-CO-S-9670 00 KAIG3-RFI-CO-S-9670-00
KAIG3-RFI-CO-S-9671 00 KAIG3-RFI-CO-S-9671-00
KAIG3-RFI-CO-C-8276 00 KAIG3-RFI-CO-C-8276-00
KAIG3-RFI-CO-S-8176 01 KAIG3-RFI-CO-S-8176-01
KAIG3-RFI-LM-S-8044 01 KAIG3-RFI-LM-S-8044-01
KAIG3-RFI-CO-S-9673 00 KAIG3-RFI-CO-S-9673-00
KAIG3-RFI-CO-S-7328 01 KAIG3-RFI-CO-S-7328-01
KAIG3-RFI-CO-S-7219 01 KAIG3-RFI-CO-S-7219-01
KAIG3-RFI-CO-S-7037 01 KAIG3-RFI-CO-S-7037-01
KAIG3-RFI-CO-S-9712 00 KAIG3-RFI-CO-S-9712-00
KAIG3-RFI-CO-S-9739 00 KAIG3-RFI-CO-S-9739-00
KAIG3-RFI-EC-S-9738 00 KAIG3-RFI-EC-S-9738-00
KAIG3-RFI-CO-C-8252 00 KAIG3-RFI-CO-C-8252-00
KAIG3-RFI-CO-SU-3146 00 KAIG3-RFI-CO-SU-3146-00
KAIG3-RFI-CO-SU-3147 00 KAIG3-RFI-CO-SU-3147-00
KAIG3-RFI-CO-SU-3150 00 KAIG3-RFI-CO-SU-3150-00
KAIG3-RFI-CO-SU-3151 00 KAIG3-RFI-CO-SU-3151-00
KAIG3-RFI-SM-SU-3152 00 KAIG3-RFI-SM-SU-3152-00
KAIG3-RFI-SM-SU-3153 00 KAIG3-RFI-SM-SU-3153-00
KAIG3-RFI-EC-SU-3155 00 KAIG3-RFI-EC-SU-3155-00
KAIG3-RFI-MC-SU-3013 00 KAIG3-RFI-MC-SU-3013-00
KAIG3-RFI-CO-S-9702 00 KAIG3-RFI-CO-S-9702-00
KAIG3-RFI-CO-S-9703 00 KAIG3-RFI-CO-S-9703-00
KAIG3-RFI-CO-S-9704 00 KAIG3-RFI-CO-S-9704-00
KAIG3-RFI-CF-S-9699 00 KAIG3-RFI-CF-S-9699-00
KAIG3-RFI-CO-S-9705 00 KAIG3-RFI-CO-S-9705-00
KAIG3-RFI-CO-S-9706 00 KAIG3-RFI-CO-S-9706-00
KAIG3-RFI-CO-S-9707 00 KAIG3-RFI-CO-S-9707-00
KAIG3-RFI-CO-S-9711 00 KAIG3-RFI-CO-S-9711-00
KAIG3-RFI-CO-S-9713 00 KAIG3-RFI-CO-S-9713-00
KAIG3-RFI-CO-S-9714 00 KAIG3-RFI-CO-S-9714-00
KAIG3-RFI-SM-S-9715 00 KAIG3-RFI-SM-S-9715-00
KAIG3-RFI-SM-S-9716 00 KAIG3-RFI-SM-S-9716-00
KAIG3-RFI-SM-S-9718 00 KAIG3-RFI-SM-S-9718-00
KAIG3-RFI-SM-S-9719 00 KAIG3-RFI-SM-S-9719-00
KAIG3-RFI-CO-S-9724 00 KAIG3-RFI-CO-S-9724-00
KAIG3-RFI-TG-LS-1663 00 KAIG3-RFI-TG-LS-1663-00
KAIG3-RFI-EC-S-9723 00 KAIG3-RFI-EC-S-9723-00
KAIG3-RFI-CO-S-9558 00 KAIG3-RFI-CO-S-9558-00
KAIG3-RFI-MC-C-8251 00 KAIG3-RFI-MC-C-8251-00
KAIG3-RFI-TG-C-8279 00 KAIG3-RFI-TG-C-8279-00
KAIG3-RFI-MB-A-1162 00 KAIG3-RFI-MB-A-1162-00
KAIG3-RFI-MB-A-1161 00 KAIG3-RFI-MB-A-1161-00
KAIG3-RFI-MB-A-1160 00 KAIG3-RFI-MB-A-1160-00
KAIG3-RFI-AG-A-1159 00 KAIG3-RFI-AG-A-1159-00
KAIG3-RFI-PG-C-8257 00 KAIG3-RFI-PG-C-8257-00
KAIG3-RFI-SG-C-8256 00 KAIG3-RFI-SG-C-8256-00
KAIG3-RFI-WG-C-8255 00 KAIG3-RFI-WG-C-8255-00
KAIG3-RFI-WG-C-8254 00 KAIG3-RFI-WG-C-8254-00
KAIG3-RFI-WG-C-8253 00 KAIG3-RFI-WG-C-8253-00
KAIG3-RFI-PG-SU-3149 00 KAIG3-RFI-PG-SU-3149-00
KAIG3-RFI-PG-SU-3148 00 KAIG3-RFI-PG-SU-3148-00
KAIG3-RFI-PG-S-9708 00 KAIG3-RFI-PG-S-9708-00
KAIG3-RFI-MC-S-9700 00 KAIG3-RFI-MC-S-9700-00
KAIG3-RFI-MC-S-7996 01 KAIG3-RFI-MC-S-7996-01
KAIG3-RFI-CF-S-9682 00 KAIG3-RFI-CF-S-9682-00
KAIG3-RFI-CF-S-9684 00 KAIG3-RFI-CF-S-9684-00
KAIG3-RFI-CF-S-9683 00 KAIG3-RFI-CF-S-9683-00
KAIG3-RFI-CF-SU-3138 00 KAIG3-RFI-CF-SU-3138-00
KAIG3-RFI-SW-C-8229 00 KAIG3-RFI-SW-C-8229-00
KAIG3-RFI-SW-C-8248 00 KAIG3-RFI-SW-C-8248-00
KAIG3-RFI-SW-C-8247 00 KAIG3-RFI-SW-C-8247-00
KAIG3-RFI-SW-C-8246 00 KAIG3-RFI-SW-C-8246-00
KAIG3-RFI-SW-C-8245 00 KAIG3-RFI-SW-C-8245-00
KAIG3-RFI-SW-C-8244 00 KAIG3-RFI-SW-C-8244-00
KAIG3-RFI-SW-C-8243 00 KAIG3-RFI-SW-C-8243-00
KAIG3-RFI-SW-C-8242 00 KAIG3-RFI-SW-C-8242-00
KAIG3-RFI-SW-C-8241 00 KAIG3-RFI-SW-C-8241-00
KAIG3-RFI-SW-C-8240 00 KAIG3-RFI-SW-C-8240-00
KAIG3-RFI-SW-C-8200 00 KAIG3-RFI-SW-C-8200-00
KAIG3-RFI-SW-LS-1658 00 KAIG3-RFI-SW-LS-1658-00
KAIG3-RFI-SW-LS-1657 00 KAIG3-RFI-SW-LS-1657-00
KAIG3-RFI-SW-C-8239 00 KAIG3-RFI-SW-C-8239-00
KAIG3-RFI-SW-C-8238 00 KAIG3-RFI-SW-C-8238-00
KAIG3-RFI-SW-C-8237 00 KAIG3-RFI-SW-C-8237-00
KAIG3-RFI-SW-C-8236 00 KAIG3-RFI-SW-C-8236-00
KAIG3-RFI-SW-C-8235 00 KAIG3-RFI-SW-C-8235-00
KAIG3-RFI-SW-C-8234 00 KAIG3-RFI-SW-C-8234-00
KAIG3-RFI-SW-C-8233 00 KAIG3-RFI-SW-C-8233-00
KAIG3-RFI-SW-C-8232 00 KAIG3-RFI-SW-C-8232-00
KAIG3-RFI-SW-C-8231 00 KAIG3-RFI-SW-C-8231-00
KAIG3-RFI-SW-C-8230 00 KAIG3-RFI-SW-C-8230-00
KAIG3-RFI-SW-C-8225 00 KAIG3-RFI-SW-C-8225-00
KAIG3-RFI-SW-C-8224 00 KAIG3-RFI-SW-C-8224-00
KAIG3-RFI-SW-C-8222 00 KAIG3-RFI-SW-C-8222-00
KAIG3-RFI-SW-C-8221 00 KAIG3-RFI-SW-C-8221-00
KAIG3-RFI-PA-C-8220 00 KAIG3-RFI-PA-C-8220-00
KAIG3-RFI-PA-C-8218 00 KAIG3-RFI-PA-C-8218-00
KAIG3-RFI-SW-C-8127 00 KAIG3-RFI-SW-C-8127-00
KAIG3-RFI-PA-LS-1654 00 KAIG3-RFI-PA-LS-1654-00
KAIG3-RFI-PA-LS-1653 00 KAIG3-RFI-PA-LS-1653-00
KAIG3-RFI-SW-C-7080 01 KAIG3-RFI-SW-C-7080-01
KAIG3-RFI-SW-C-8217 00 KAIG3-RFI-SW-C-8217-00
KAIG3-RFI-SW-C-8216 00 KAIG3-RFI-SW-C-8216-00
KAIG3-RFI-SW-C-8215 00 KAIG3-RFI-SW-C-8215-00
KAIG3-RFI-SW-C-8210 00 KAIG3-RFI-SW-C-8210-00
KAIG3-RFI-SW-C-8209 00 KAIG3-RFI-SW-C-8209-00
KAIG3-RFI-SW-C-8208 00 KAIG3-RFI-SW-C-8208-00
KAIG3-RFI-SW-C-8207 00 KAIG3-RFI-SW-C-8207-00
KAIG3-RFI-SW-C-8206 00 KAIG3-RFI-SW-C-8206-00
KAIG3-RFI-SW-C-8182 00 KAIG3-RFI-SW-C-8182-00
KAIG3-RFI-SW-LS-1645 00 KAIG3-RFI-SW-LS-1645-00
KAIG3-RFI-PA-LS-1651 00 KAIG3-RFI-PA-LS-1651-00
KAIG3-RFI-SW-C-7769 01 KAIG3-RFI-SW-C-7769-01
KAIG3-RFI-PC-LC-0840 00 KAIG3-RFI-PC-LC-0840-00
KAIG3-RFI-PC-LC-0839 00 KAIG3-RFI-PC-LC-0839-00
KAIG3-RFI-CO-A-1158 00 KAIG3-RFI-CO-A-1158-00
KAIG3-RFI-CO-A-1157 00 KAIG3-RFI-CO-A-1157-00
KAIG3-RFI-CO-A-1146 00 KAIG3-RFI-CO-A-1146-00
KAIG3-RFI-CO-A-1145 00 KAIG3-RFI-CO-A-1145-00
KAIG3-RFI-CO-A-1144 00 KAIG3-RFI-CO-A-1144-00
KAIG3-RFI-CO-A-1143 00 KAIG3-RFI-CO-A-1143-00
KAIG3-RFI-CO-A-1142 00 KAIG3-RFI-CO-A-1142-00
KAIG3-RFI-CO-A-1141 00 KAIG3-RFI-CO-A-1141-00
KAIG3-RFI-CO-S-7810 01 KAIG3-RFI-CO-S-7810-01
KAIG3-RFI-CO-S-7809 01 KAIG3-RFI-CO-S-7809-01
KAIG3-RFI-MC-S-9305 00 KAIG3-RFI-MC-S-9305-00
KAIG3-RFI-MC-S-9306 00 KAIG3-RFI-MC-S-9306-00
KAIG3-RFI-CF-S-9626 00 KAIG3-RFI-CF-S-9626-00
KAIG3-RFI-LM-S-9653 00 KAIG3-RFI-LM-S-9653-00
KAIG3-RFI-MB-LC-0835 00 KAIG3-RFI-MB-LC-0835-00
KAIG3-RFI-WG-S-9701 00 KAIG3-RFI-WG-S-9701-00
KAIG3-RFI-MB-A-1156 00 KAIG3-RFI-MB-A-1156-00
KAIG3-RFI-SW-LC-0830 00 KAIG3-RFI-SW-LC-0830-00
KAIG3-RFI-MB-LC-0836 00 KAIG3-RFI-MB-LC-0836-00
KAIG3-RFI-SW-LC-0833 00 KAIG3-RFI-SW-LC-0833-00
KAIG3-RFI-SW-LC-0831 00 KAIG3-RFI-SW-LC-0831-00
KAIG3-RFI-PG-SU-3141 00 KAIG3-RFI-PG-SU-3141-00
KAIG3-RFI-TB-SU-3140 00 KAIG3-RFI-TB-SU-3140-00
KAIG3-RFI-WG-C-8025 01 KAIG3-RFI-WG-C-8025-01
KAIG3-RFI-WG-C-8228 00 KAIG3-RFI-WG-C-8228-00
KAIG3-RFI-WG-C-8213 00 KAIG3-RFI-WG-C-8213-00
KAIG3-RFI-PG-S-9688 00 KAIG3-RFI-PG-S-9688-00
KAIG3-RFI-TB-S-9687 00 KAIG3-RFI-TB-S-9687-00
KAIG3-RFI-WG-S-9679 00 KAIG3-RFI-WG-S-9679-00
KAIG3-RFI-WG-S-9669 00 KAIG3-RFI-WG-S-9669-00
KAIG3-RFI-SA-S-9572 00 KAIG3-RFI-SA-S-9572-00
KAIG3-RFI-CO-C-8227 00 KAIG3-RFI-CO-C-8227-00
KAIG3-RFI-LM-S-7362 01 KAIG3-RFI-LM-S-7362-01
KAIG3-RFI-CO-S-7385 01 KAIG3-RFI-CO-S-7385-01
KAIG3-RFI-CO-A-1061 01 KAIG3-RFI-CO-A-1061-01
KAIG3-RFI-PC-S-7398 01 KAIG3-RFI-PC-S-7398-01
KAIG3-RFI-CO-A-1062 01 KAIG3-RFI-CO-A-1062-01
KAIG3-RFI-CO-A-1063 01 KAIG3-RFI-CO-A-1063-01
KAIG3-RFI-CO-A-1064 01 KAIG3-RFI-CO-A-1064-01
KAIG3-RFI-CO-S-7719 01 KAIG3-RFI-CO-S-7719-01
KAIG3-RFI-CO-A-1025 01 KAIG3-RFI-CO-A-1025-01
KAIG3-RFI-CF-S-9527 01 KAIG3-RFI-CF-S-9527-01
KAIG3-RFI-CO-A-0990 01 KAIG3-RFI-CO-A-0990-01
KAIG3-RFI-CF-S-9692 00 KAIG3-RFI-CF-S-9692-00
KAIG3-RFI-CF-SU-3143 00 KAIG3-RFI-CF-SU-3143-00
KAIG3-RFI-CO-S-9696 00 KAIG3-RFI-CO-S-9696-00
KAIG3-RFI-CO-S-9697 00 KAIG3-RFI-CO-S-9697-00
KAIG3-RFI-CO-SU-3144 00 KAIG3-RFI-CO-SU-3144-00
KAIG3-RFI-CO-S-9694 00 KAIG3-RFI-CO-S-9694-00
KAIG3-RFI-CO-S-9680 00 KAIG3-RFI-CO-S-9680-00
KAIG3-RFI-MC-S-9674 00 KAIG3-RFI-MC-S-9674-00
KAIG3-RFI-MC-S-9675 00 KAIG3-RFI-MC-S-9675-00
KAIG3-RFI-MC-S-9676 00 KAIG3-RFI-MC-S-9676-00
KAIG3-RFI-MC-S-9677 00 KAIG3-RFI-MC-S-9677-00
KAIG3-RFI-MC-S-9678 00 KAIG3-RFI-MC-S-9678-00
KAIG3-RFI-LM-LC-0838 00 KAIG3-RFI-LM-LC-0838-00
KAIG3-RFI-CO-S-9681 00 KAIG3-RFI-CO-S-9681-00
KAIG3-RFI-LM-LC-0837 00 KAIG3-RFI-LM-LC-0837-00
KAIG3-RFI-CO-A-1154 00 KAIG3-RFI-CO-A-1154-00
KAIG3-RFI-CO-A-1155 00 KAIG3-RFI-CO-A-1155-00
KAIG3-RFI-CO-S-6946 01 KAIG3-RFI-CO-S-6946-01
KAIG3-RFI-EC-SU-3139 00 KAIG3-RFI-EC-SU-3139-00
KAIG3-RFI-EC-SU-3142 00 KAIG3-RFI-EC-SU-3142-00
KAIG3-RFI-EC-S-9690 00 KAIG3-RFI-EC-S-9690-00
KAIG3-RFI-EC-C-8226 00 KAIG3-RFI-EC-C-8226-00
KAIG3-RFI-CO-S-9595 00 KAIG3-RFI-CO-S-9595-00
KAIG3-RFI-CO-SS-0447 00 KAIG3-RFI-CO-SS-0447-00
KAIG3-RFI-CO-S-9659 00 KAIG3-RFI-CO-S-9659-00
KAIG3-RFI-CO-S-9661 00 KAIG3-RFI-CO-S-9661-00
KAIG3-RFI-CO-S-9660 00 KAIG3-RFI-CO-S-9660-00
KAIG3-RFI-CO-S-9665 00 KAIG3-RFI-CO-S-9665-00
KAIG3-RFI-CO-S-9662 00 KAIG3-RFI-CO-S-9662-00
KAIG3-RFI-CO-S-9663 00 KAIG3-RFI-CO-S-9663-00
KAIG3-RFI-MC-A-1153 00 KAIG3-RFI-MC-A-1153-00
KAIG3-RFI-CO-S-9664 00 KAIG3-RFI-CO-S-9664-00
KAIG3-RFI-SW-LS-1652 00 KAIG3-RFI-SW-LS-1652-00
KAIG3-RFI-CO-SU-3137 00 KAIG3-RFI-CO-SU-3137-00
KAIG3-RFI-PC-SU-2463 01 KAIG3-RFI-PC-SU-2463-01
KAIG3-RFI-SW-M-0334 00 KAIG3-RFI-SW-M-0334-00
KAIG3-RFI-PC-SU-2474 01 KAIG3-RFI-PC-SU-2474-01
KAIG3-RFI-PG-P-0333 00 KAIG3-RFI-PG-P-0333-00
KAIG3-RFI-CO-SU-2601 01 KAIG3-RFI-CO-SU-2601-01
KAIG3-RFI-CO-SU-2480 01 KAIG3-RFI-CO-SU-2480-01
KAIG3-RFI-CO-S-6714 01 KAIG3-RFI-CO-S-6714-01
KAIG3-RFI-CO-S-9623 00 KAIG3-RFI-CO-S-9623-00
KAIG3-RFI-MC-S-9307 00 KAIG3-RFI-MC-S-9307-00
KAIG3-RFI-CO-S-9648 00 KAIG3-RFI-CO-S-9648-00
KAIG3-RFI-CO-S-9649 00 KAIG3-RFI-CO-S-9649-00
KAIG3-RFI-CO-S-9650 00 KAIG3-RFI-CO-S-9650-00
KAIG3-RFI-MC-C-8194 00 KAIG3-RFI-MC-C-8194-00
KAIG3-RFI-CO-C-8195 00 KAIG3-RFI-CO-C-8195-00
KAIG3-RFI-LM-S-9651 00 KAIG3-RFI-LM-S-9651-00
KAIG3-RFI-LM-S-9652 00 KAIG3-RFI-LM-S-9652-00
KAIG3-RFI-LM-SU-3133 00 KAIG3-RFI-LM-SU-3133-00
KAIG3-RFI-CF-S-9654 00 KAIG3-RFI-CF-S-9654-00
KAIG3-RFI-CF-S-9655 00 KAIG3-RFI-CF-S-9655-00
KAIG3-RFI-CF-SU-3134 00 KAIG3-RFI-CF-SU-3134-00
KAIG3-RFI-LM-SU-3135 00 KAIG3-RFI-LM-SU-3135-00
KAIG3-RFI-CO-S-9637 00 KAIG3-RFI-CO-S-9637-00
KAIG3-RFI-CO-S-9638 00 KAIG3-RFI-CO-S-9638-00
KAIG3-RFI-CO-SU-3129 00 KAIG3-RFI-CO-SU-3129-00
KAIG3-RFI-EC-SU-3128 00 KAIG3-RFI-EC-SU-3128-00
KAIG3-RFI-EC-S-9635 00 KAIG3-RFI-EC-S-9635-00
KAIG3-RFI-SA-S-9643 00 KAIG3-RFI-SA-S-9643-00
KAIG3-RFI-SA-S-9644 00 KAIG3-RFI-SA-S-9644-00
KAIG3-RFI-SA-SU-3131 00 KAIG3-RFI-SA-SU-3131-00
KAIG3-RFI-SA-S-9642 00 KAIG3-RFI-SA-S-9642-00
KAIG3-RFI-EC-S-9634 00 KAIG3-RFI-EC-S-9634-00
KAIG3-RFI-EC-SU-3127 00 KAIG3-RFI-EC-SU-3127-00
KAIG3-RFI-SM-S-9636 00 KAIG3-RFI-SM-S-9636-00
KAIG3-RFI-MC-C-8187 00 KAIG3-RFI-MC-C-8187-00
KAIG3-RFI-CO-C-8188 00 KAIG3-RFI-CO-C-8188-00
KAIG3-RFI-VG-S-9639 00 KAIG3-RFI-VG-S-9639-00
KAIG3-RFI-VG-SU-3130 00 KAIG3-RFI-VG-SU-3130-00
KAIG3-RFI-MB-LC-0834 00 KAIG3-RFI-MB-LC-0834-00
KAIG3-RFI-SW-C-8205 00 KAIG3-RFI-SW-C-8205-00
KAIG3-RFI-SW-C-8204 00 KAIG3-RFI-SW-C-8204-00
KAIG3-RFI-SW-C-8203 00 KAIG3-RFI-SW-C-8203-00
KAIG3-RFI-SW-C-8202 00 KAIG3-RFI-SW-C-8202-00
KAIG3-RFI-SW-C-8201 00 KAIG3-RFI-SW-C-8201-00
KAIG3-RFI-SW-C-8199 00 KAIG3-RFI-SW-C-8199-00
KAIG3-RFI-SW-C-8198 00 KAIG3-RFI-SW-C-8198-00
KAIG3-RFI-SW-C-8197 00 KAIG3-RFI-SW-C-8197-00
KAIG3-RFI-SW-C-8196 00 KAIG3-RFI-SW-C-8196-00
KAIG3-RFI-SW-C-8185 00 KAIG3-RFI-SW-C-8185-00
KAIG3-RFI-SW-C-8184 00 KAIG3-RFI-SW-C-8184-00
KAIG3-RFI-SW-C-8183 00 KAIG3-RFI-SW-C-8183-00
KAIG3-RFI-SW-C-8152 00 KAIG3-RFI-SW-C-8152-00
KAIG3-RFI-SW-C-8155 00 KAIG3-RFI-SW-C-8155-00
KAIG3-RFI-SW-E-0606 00 KAIG3-RFI-SW-E-0606-00
KAIG3-RFI-SW-M-0332 00 KAIG3-RFI-SW-M-0332-00
KAIG3-RFI-LM-P-0331 00 KAIG3-RFI-LM-P-0331-00
KAIG3-RFI-SW-P-0330 00 KAIG3-RFI-SW-P-0330-00
KAIG3-RFI-CF-P-0329 00 KAIG3-RFI-CF-P-0329-00
KAIG3-RFI-PA-LS-1647 00 KAIG3-RFI-PA-LS-1647-00
KAIG3-RFI-SW-LS-1644 00 KAIG3-RFI-SW-LS-1644-00
KAIG3-RFI-SW-LS-1643 00 KAIG3-RFI-SW-LS-1643-00
KAIG3-RFI-SW-LS-1642 00 KAIG3-RFI-SW-LS-1642-00
KAIG3-RFI-SW-LS-1641 00 KAIG3-RFI-SW-LS-1641-00
KAIG3-RFI-SW-LS-1640 00 KAIG3-RFI-SW-LS-1640-00
KAIG3-RFI-PG-LS-1650 00 KAIG3-RFI-PG-LS-1650-00
KAIG3-RFI-SW-C-8181 00 KAIG3-RFI-SW-C-8181-00
KAIG3-RFI-PG-LS-1649 00 KAIG3-RFI-PG-LS-1649-00
KAIG3-RFI-SW-C-8180 00 KAIG3-RFI-SW-C-8180-00
KAIG3-RFI-DG-LS-1648 00 KAIG3-RFI-DG-LS-1648-00
KAIG3-RFI-SW-C-8179 00 KAIG3-RFI-SW-C-8179-00
KAIG3-RFI-TG-SS-0448 00 KAIG3-RFI-TG-SS-0448-00
KAIG3-RFI-SW-C-8178 00 KAIG3-RFI-SW-C-8178-00
KAIG3-RFI-SW-C-8177 00 KAIG3-RFI-SW-C-8177-00
KAIG3-RFI-PG-S-9668 00 KAIG3-RFI-PG-S-9668-00
KAIG3-RFI-SW-C-8176 00 KAIG3-RFI-SW-C-8176-00
KAIG3-RFI-TB-S-9667 00 KAIG3-RFI-TB-S-9667-00
KAIG3-RFI-SW-C-8175 00 KAIG3-RFI-SW-C-8175-00
KAIG3-RFI-WG-S-9666 00 KAIG3-RFI-WG-S-9666-00
KAIG3-RFI-SW-C-8174 00 KAIG3-RFI-SW-C-8174-00
KAIG3-RFI-TG-C-8212 00 KAIG3-RFI-TG-C-8212-00
KAIG3-RFI-SW-C-8173 00 KAIG3-RFI-SW-C-8173-00
KAIG3-RFI-SW-C-8154 00 KAIG3-RFI-SW-C-8154-00
KAIG3-RFI-SW-C-8153 00 KAIG3-RFI-SW-C-8153-00
KAIG3-RFI-SW-C-8151 00 KAIG3-RFI-SW-C-8151-00
KAIG3-RFI-SW-C-8088 00 KAIG3-RFI-SW-C-8088-00
KAIG3-RFI-LM-LC-0832 00 KAIG3-RFI-LM-LC-0832-00
KAIG3-RFI-LM-E-0605 00 KAIG3-RFI-LM-E-0605-00
KAIG3-RFI-CO-S-9646 00 KAIG3-RFI-CO-S-9646-00
KAIG3-RFI-CO-S-9647 00 KAIG3-RFI-CO-S-9647-00
KAIG3-RFI-CO-SU-3132 00 KAIG3-RFI-CO-SU-3132-00
KAIG3-RFI-CO-S-9641 00 KAIG3-RFI-CO-S-9641-00
KAIG3-RFI-CO-A-1149 00 KAIG3-RFI-CO-A-1149-00
KAIG3-RFI-CO-A-1150 00 KAIG3-RFI-CO-A-1150-00
KAIG3-RFI-MC-A-1151 00 KAIG3-RFI-MC-A-1151-00
KAIG3-RFI-VG-S-9633 00 KAIG3-RFI-VG-S-9633-00
KAIG3-RFI-CO-S-9631 00 KAIG3-RFI-CO-S-9631-00
KAIG3-RFI-CO-S-9632 00 KAIG3-RFI-CO-S-9632-00
KAIG3-RFI-DG-LS-1646 00 KAIG3-RFI-DG-LS-1646-00
KAIG3-RFI-PG-S-9645 00 KAIG3-RFI-PG-S-9645-00
KAIG3-RFI-WG-C-8193 00 KAIG3-RFI-WG-C-8193-00
KAIG3-RFI-WG-C-8192 00 KAIG3-RFI-WG-C-8192-00
KAIG3-RFI-ZG-C-8191 00 KAIG3-RFI-ZG-C-8191-00
KAIG3-RFI-WG-C-8190 00 KAIG3-RFI-WG-C-8190-00
KAIG3-RFI-WG-C-8186 00 KAIG3-RFI-WG-C-8186-00
KAIG3-RFI-SW-C-8146 00 KAIG3-RFI-SW-C-8146-00
KAIG3-RFI-SW-C-8144 00 KAIG3-RFI-SW-C-8144-00
KAIG3-RFI-SW-C-8064 00 KAIG3-RFI-SW-C-8064-00
KAIG3-RFI-SW-LS-1639 00 KAIG3-RFI-SW-LS-1639-00
KAIG3-RFI-SW-C-8150 00 KAIG3-RFI-SW-C-8150-00
KAIG3-RFI-SW-C-8149 00 KAIG3-RFI-SW-C-8149-00
KAIG3-RFI-SW-C-8148 00 KAIG3-RFI-SW-C-8148-00
KAIG3-RFI-SW-C-8147 00 KAIG3-RFI-SW-C-8147-00
KAIG3-RFI-SW-C-8145 00 KAIG3-RFI-SW-C-8145-00
KAIG3-RFI-SW-C-8143 00 KAIG3-RFI-SW-C-8143-00
KAIG3-RFI-SW-C-8142 00 KAIG3-RFI-SW-C-8142-00
KAIG3-RFI-SW-C-8141 00 KAIG3-RFI-SW-C-8141-00
KAIG3-RFI-SW-C-8134 00 KAIG3-RFI-SW-C-8134-00
KAIG3-RFI-SW-C-8133 00 KAIG3-RFI-SW-C-8133-00
KAIG3-RFI-SW-C-8132 00 KAIG3-RFI-SW-C-8132-00
KAIG3-RFI-SW-C-8131 00 KAIG3-RFI-SW-C-8131-00
KAIG3-RFI-SW-C-8130 00 KAIG3-RFI-SW-C-8130-00
KAIG3-RFI-SW-C-8129 00 KAIG3-RFI-SW-C-8129-00
KAIG3-RFI-SW-C-8128 00 KAIG3-RFI-SW-C-8128-00
KAIG3-RFI-PG-S-9627 00 KAIG3-RFI-PG-S-9627-00
KAIG3-RFI-WG-S-9616 00 KAIG3-RFI-WG-S-9616-00
KAIG3-RFI-SW-LS-1638 00 KAIG3-RFI-SW-LS-1638-00
KAIG3-RFI-WG-S-9613 00 KAIG3-RFI-WG-S-9613-00
KAIG3-RFI-WG-C-8165 00 KAIG3-RFI-WG-C-8165-00
KAIG3-RFI-SW-C-8126 00 KAIG3-RFI-SW-C-8126-00
KAIG3-RFI-SW-C-8125 00 KAIG3-RFI-SW-C-8125-00
KAIG3-RFI-SG-C-7944 01 KAIG3-RFI-SG-C-7944-01
KAIG3-RFI-SW-C-8124 00 KAIG3-RFI-SW-C-8124-00
KAIG3-RFI-SW-C-8123 00 KAIG3-RFI-SW-C-8123-00
KAIG3-RFI-PA-C-8122 00 KAIG3-RFI-PA-C-8122-00
KAIG3-RFI-SW-C-8121 00 KAIG3-RFI-SW-C-8121-00
KAIG3-RFI-ZG-C-8164 00 KAIG3-RFI-ZG-C-8164-00
KAIG3-RFI-SW-C-8163 00 KAIG3-RFI-SW-C-8163-00
KAIG3-RFI-WG-C-8162 00 KAIG3-RFI-WG-C-8162-00
KAIG3-RFI-WG-C-8161 00 KAIG3-RFI-WG-C-8161-00
KAIG3-RFI-WG-C-8160 00 KAIG3-RFI-WG-C-8160-00
KAIG3-RFI-SW-C-8159 00 KAIG3-RFI-SW-C-8159-00
KAIG3-RFI-WG-C-8158 00 KAIG3-RFI-WG-C-8158-00
KAIG3-RFI-SW-LS-1527 00 KAIG3-RFI-SW-LS-1527-00
KAIG3-RFI-WG-LC-0823 00 KAIG3-RFI-WG-LC-0823-00
KAIG3-RFI-WG-LC-0822 00 KAIG3-RFI-WG-LC-0822-00
KAIG3-RFI-CO-SS-0446 00 KAIG3-RFI-CO-SS-0446-00
KAIG3-RFI-EC-S-9617 00 KAIG3-RFI-EC-S-9617-00
KAIG3-RFI-CO-S-9618 00 KAIG3-RFI-CO-S-9618-00
KAIG3-RFI-CO-S-9620 00 KAIG3-RFI-CO-S-9620-00
KAIG3-RFI-CO-S-9621 00 KAIG3-RFI-CO-S-9621-00
KAIG3-RFI-CO-S-9597 00 KAIG3-RFI-CO-S-9597-00
KAIG3-RFI-CO-A-1139 00 KAIG3-RFI-CO-A-1139-00
KAIG3-RFI-CO-A-1147 00 KAIG3-RFI-CO-A-1147-00
KAIG3-RFI-CO-S-9622 00 KAIG3-RFI-CO-S-9622-00
KAIG3-RFI-CO-SU-3125 00 KAIG3-RFI-CO-SU-3125-00
KAIG3-RFI-CF-S-9624 00 KAIG3-RFI-CF-S-9624-00
KAIG3-RFI-CF-S-9625 00 KAIG3-RFI-CF-S-9625-00
KAIG3-RFI-CF-SU-3126 00 KAIG3-RFI-CF-SU-3126-00
KAIG3-RFI-CO-C-8169 00 KAIG3-RFI-CO-C-8169-00
KAIG3-RFI-VG-C-8136 00 KAIG3-RFI-VG-C-8136-00
KAIG3-RFI-CO-SU-3093 00 KAIG3-RFI-CO-SU-3093-00
KAIG3-RFI-CO-A-1136 00 KAIG3-RFI-CO-A-1136-00
KAIG3-RFI-EC-A-1137 00 KAIG3-RFI-EC-A-1137-00
KAIG3-RFI-CO-S-9606 00 KAIG3-RFI-CO-S-9606-00
KAIG3-RFI-CO-S-9607 00 KAIG3-RFI-CO-S-9607-00
KAIG3-RFI-CO-S-9608 00 KAIG3-RFI-CO-S-9608-00
KAIG3-RFI-CO-S-9612 00 KAIG3-RFI-CO-S-9612-00
KAIG3-RFI-RG-C-8166 00 KAIG3-RFI-RG-C-8166-00
KAIG3-RFI-CO-S-9695 00 KAIG3-RFI-CO-S-9695-00
KAIG3-RFI-CO-C-8167 00 KAIG3-RFI-CO-C-8167-00
KAIG3-RFI-CO-S-9609 00 KAIG3-RFI-CO-S-9609-00
KAIG3-RFI-MC-C-8168 00 KAIG3-RFI-MC-C-8168-00
KAIG3-RFI-CO-S-9610 00 KAIG3-RFI-CO-S-9610-00
KAIG3-RFI-LM-S-9614 00 KAIG3-RFI-LM-S-9614-00
KAIG3-RFI-CO-S-9611 00 KAIG3-RFI-CO-S-9611-00
KAIG3-RFI-LM-S-9615 00 KAIG3-RFI-LM-S-9615-00
KAIG3-RFI-CO-SU-3123 00 KAIG3-RFI-CO-SU-3123-00
KAIG3-RFI-LM-SU-3124 00 KAIG3-RFI-LM-SU-3124-00
KAIG3-RFI-CO-S-9539 00 KAIG3-RFI-CO-S-9539-00
KAIG3-RFI-SM-S-9556 00 KAIG3-RFI-SM-S-9556-00
KAIG3-RFI-CO-S-9581 00 KAIG3-RFI-CO-S-9581-00
KAIG3-RFI-CO-S-9600 00 KAIG3-RFI-CO-S-9600-00
KAIG3-RFI-CO-S-9601 00 KAIG3-RFI-CO-S-9601-00
KAIG3-RFI-CO-SU-3200 00 KAIG3-RFI-CO-SU-3200-00
KAIG3-RFI-CO-SS-0460 00 KAIG3-RFI-CO-SS-0460-00
KAIG3-RFI-MC-A-1140 00 KAIG3-RFI-MC-A-1140-00
KAIG3-RFI-MC-S-9592 00 KAIG3-RFI-MC-S-9592-00
KAIG3-RFI-MC-S-9593 00 KAIG3-RFI-MC-S-9593-00
KAIG3-RFI-MC-SU-3117 00 KAIG3-RFI-MC-SU-3117-00
KAIG3-RFI-CO-S-9594 00 KAIG3-RFI-CO-S-9594-00
KAIG3-RFI-CO-SU-3118 00 KAIG3-RFI-CO-SU-3118-00
KAIG3-RFI-MC-A-1135 00 KAIG3-RFI-MC-A-1135-00
KAIG3-RFI-CO-S-9596 00 KAIG3-RFI-CO-S-9596-00
KAIG3-RFI-CO-SU-3119 00 KAIG3-RFI-CO-SU-3119-00
KAIG3-RFI-CF-LC-0817 01 KAIG3-RFI-CF-LC-0817-01
KAIG3-RFI-AG-LC-0829 00 KAIG3-RFI-AG-LC-0829-00
KAIG3-RFI-AG-LC-0828 00 KAIG3-RFI-AG-LC-0828-00
KAIG3-RFI-AG-LC-0827 00 KAIG3-RFI-AG-LC-0827-00
KAIG3-RFI-MB-LC-0826 00 KAIG3-RFI-MB-LC-0826-00
KAIG3-RFI-SW-C-8139 00 KAIG3-RFI-SW-C-8139-00
KAIG3-RFI-SW-C-8140 00 KAIG3-RFI-SW-C-8140-00
KAIG3-RFI-AG-E-0604 00 KAIG3-RFI-AG-E-0604-00
KAIG3-RFI-CO-S-9598 00 KAIG3-RFI-CO-S-9598-00
KAIG3-RFI-NA-P-0328 00 KAIG3-RFI-NA-P-0328-00
KAIG3-RFI-CO-S-9599 00 KAIG3-RFI-CO-S-9599-00
KAIG3-RFI-CO-SU-3120 00 KAIG3-RFI-CO-SU-3120-00
KAIG3-RFI-MB-E-0603 00 KAIG3-RFI-MB-E-0603-00
KAIG3-RFI-EC-SU-3121 00 KAIG3-RFI-EC-SU-3121-00
KAIG3-RFI-EC-S-9605 00 KAIG3-RFI-EC-S-9605-00
KAIG3-RFI-TT-E-0575 01 KAIG3-RFI-TT-E-0575-01
KAIG3-RFI-CO-S-9584 00 KAIG3-RFI-CO-S-9584-00
KAIG3-RFI-EC-S-9582 00 KAIG3-RFI-EC-S-9582-00
KAIG3-RFI-EC-C-8108 00 KAIG3-RFI-EC-C-8108-00
KAIG3-RFI-EC-S-9583 00 KAIG3-RFI-EC-S-9583-00
KAIG3-RFI-CO-SU-3114 00 KAIG3-RFI-CO-SU-3114-00
KAIG3-RFI-MC-S-9579 00 KAIG3-RFI-MC-S-9579-00
KAIG3-RFI-MC-S-9580 00 KAIG3-RFI-MC-S-9580-00
KAIG3-RFI-CO-C-8111 00 KAIG3-RFI-CO-C-8111-00
KAIG3-RFI-RG-C-8112 00 KAIG3-RFI-RG-C-8112-00
KAIG3-RFI-CO-S-9591 00 KAIG3-RFI-CO-S-9591-00
KAIG3-RFI-MC-S-9588 00 KAIG3-RFI-MC-S-9588-00
KAIG3-RFI-SA-S-9574 00 KAIG3-RFI-SA-S-9574-00
KAIG3-RFI-MC-SU-3116 00 KAIG3-RFI-MC-SU-3116-00
KAIG3-RFI-RG-C-8109 00 KAIG3-RFI-RG-C-8109-00
KAIG3-RFI-CO-C-8110 00 KAIG3-RFI-CO-C-8110-00
KAIG3-RFI-MC-S-9587 00 KAIG3-RFI-MC-S-9587-00
KAIG3-RFI-CO-SU-3115 00 KAIG3-RFI-CO-SU-3115-00
KAIG3-RFI-CO-S-9586 00 KAIG3-RFI-CO-S-9586-00
KAIG3-RFI-CO-S-9585 00 KAIG3-RFI-CO-S-9585-00
KAIG3-RFI-JG-C-8107 00 KAIG3-RFI-JG-C-8107-00
KAIG3-RFI-SW-C-8171 00 KAIG3-RFI-SW-C-8171-00
KAIG3-RFI-SW-C-8170 00 KAIG3-RFI-SW-C-8170-00
KAIG3-RFI-SA-S-9573 00 KAIG3-RFI-SA-S-9573-00
KAIG3-RFI-SW-M-0317 01 KAIG3-RFI-SW-M-0317-01
KAIG3-RFI-SW-C-8101 00 KAIG3-RFI-SW-C-8101-00
KAIG3-RFI-SW-C-8102 00 KAIG3-RFI-SW-C-8102-00
KAIG3-RFI-SW-LS-1637 00 KAIG3-RFI-SW-LS-1637-00
KAIG3-RFI-PA-LS-1636 00 KAIG3-RFI-PA-LS-1636-00
KAIG3-RFI-PA-LS-1635 00 KAIG3-RFI-PA-LS-1635-00
KAIG3-RFI-SW-LS-0212 02 KAIG3-RFI-SW-LS-0212-02
KAIG3-RFI-SW-C-8118 00 KAIG3-RFI-SW-C-8118-00
KAIG3-RFI-SW-C-8117 00 KAIG3-RFI-SW-C-8117-00
KAIG3-RFI-SW-C-8116 00 KAIG3-RFI-SW-C-8116-00
KAIG3-RFI-SW-C-8115 00 KAIG3-RFI-SW-C-8115-00
KAIG3-RFI-SW-C-8114 00 KAIG3-RFI-SW-C-8114-00
KAIG3-RFI-SW-C-8113 00 KAIG3-RFI-SW-C-8113-00
KAIG3-RFI-SW-C-8100 00 KAIG3-RFI-SW-C-8100-00
KAIG3-RFI-SW-C-8099 00 KAIG3-RFI-SW-C-8099-00
KAIG3-RFI-SW-C-8098 00 KAIG3-RFI-SW-C-8098-00
KAIG3-RFI-EC-S-9576 00 KAIG3-RFI-EC-S-9576-00
KAIG3-RFI-SW-C-8097 00 KAIG3-RFI-SW-C-8097-00
KAIG3-RFI-SW-C-8096 00 KAIG3-RFI-SW-C-8096-00
KAIG3-RFI-EC-SU-3111 00 KAIG3-RFI-EC-SU-3111-00
KAIG3-RFI-SW-C-8095 00 KAIG3-RFI-SW-C-8095-00
KAIG3-RFI-EC-S-9577 00 KAIG3-RFI-EC-S-9577-00
KAIG3-RFI-SW-C-8059 00 KAIG3-RFI-SW-C-8059-00
KAIG3-RFI-MC-S-9578 00 KAIG3-RFI-MC-S-9578-00
KAIG3-RFI-SW-C-8038 00 KAIG3-RFI-SW-C-8038-00
KAIG3-RFI-EC-SU-3112 00 KAIG3-RFI-EC-SU-3112-00
KAIG3-RFI-SW-C-8094 00 KAIG3-RFI-SW-C-8094-00
KAIG3-RFI-VG-C-8083 00 KAIG3-RFI-VG-C-8083-00
KAIG3-RFI-SW-C-8093 00 KAIG3-RFI-SW-C-8093-00
KAIG3-RFI-SW-C-8092 00 KAIG3-RFI-SW-C-8092-00
KAIG3-RFI-SW-C-8091 00 KAIG3-RFI-SW-C-8091-00
KAIG3-RFI-CO-C-8085 00 KAIG3-RFI-CO-C-8085-00
KAIG3-RFI-SW-C-8090 00 KAIG3-RFI-SW-C-8090-00
KAIG3-RFI-SW-C-8089 00 KAIG3-RFI-SW-C-8089-00
KAIG3-RFI-SW-C-8087 00 KAIG3-RFI-SW-C-8087-00
KAIG3-RFI-SW-C-8086 00 KAIG3-RFI-SW-C-8086-00
KAIG3-RFI-SW-C-8080 00 KAIG3-RFI-SW-C-8080-00
KAIG3-RFI-SW-C-8079 00 KAIG3-RFI-SW-C-8079-00
KAIG3-RFI-SA-SU-3110 00 KAIG3-RFI-SA-SU-3110-00
KAIG3-RFI-SW-C-8078 00 KAIG3-RFI-SW-C-8078-00
KAIG3-RFI-SW-C-8077 00 KAIG3-RFI-SW-C-8077-00
KAIG3-RFI-CO-S-8474 01 KAIG3-RFI-CO-S-8474-01
KAIG3-RFI-SW-C-8076 00 KAIG3-RFI-SW-C-8076-00
KAIG3-RFI-SW-C-8075 00 KAIG3-RFI-SW-C-8075-00
KAIG3-RFI-CO-S-9027 01 KAIG3-RFI-CO-S-9027-01
KAIG3-RFI-SW-C-8074 00 KAIG3-RFI-SW-C-8074-00
KAIG3-RFI-CO-S-9508 00 KAIG3-RFI-CO-S-9508-00
KAIG3-RFI-SW-C-8073 00 KAIG3-RFI-SW-C-8073-00
KAIG3-RFI-CO-S-4994 01 KAIG3-RFI-CO-S-4994-01
KAIG3-RFI-CO-S-4952 02 KAIG3-RFI-CO-S-4952-02
KAIG3-RFI-PA-LS-1628 00 KAIG3-RFI-PA-LS-1628-00
KAIG3-RFI-NR-S-5987 01 KAIG3-RFI-NR-S-5987-01
KAIG3-RFI-NR-S-5988 01 KAIG3-RFI-NR-S-5988-01
KAIG3-RFI-CO-S-7304 01 KAIG3-RFI-CO-S-7304-01
KAIG3-RFI-CO-SU-3105 00 KAIG3-RFI-CO-SU-3105-00
KAIG3-RFI-CO-S-9497 00 KAIG3-RFI-CO-S-9497-00
KAIG3-RFI-VG-S-9563 00 KAIG3-RFI-VG-S-9563-00
KAIG3-RFI-CO-S-9571 00 KAIG3-RFI-CO-S-9571-00
KAIG3-RFI-CO-SU-3108 00 KAIG3-RFI-CO-SU-3108-00
KAIG3-RFI-SM-SU-3104 00 KAIG3-RFI-SM-SU-3104-00
KAIG3-RFI-MC-S-9568 00 KAIG3-RFI-MC-S-9568-00
KAIG3-RFI-PG-SU-3122 00 KAIG3-RFI-PG-SU-3122-00
KAIG3-RFI-TG-C-8138 00 KAIG3-RFI-TG-C-8138-00
KAIG3-RFI-WG-C-8137 00 KAIG3-RFI-WG-C-8137-00
KAIG3-RFI-PG-C-8119 00 KAIG3-RFI-PG-C-8119-00
KAIG3-RFI-CO-S-9569 00 KAIG3-RFI-CO-S-9569-00
KAIG3-RFI-CO-S-9570 00 KAIG3-RFI-CO-S-9570-00
KAIG3-RFI-CO-A-1130 00 KAIG3-RFI-CO-A-1130-00
KAIG3-RFI-MC-S-9562 00 KAIG3-RFI-MC-S-9562-00
KAIG3-RFI-MC-SU-3106 00 KAIG3-RFI-MC-SU-3106-00
KAIG3-RFI-SM-S-9555 00 KAIG3-RFI-SM-S-9555-00
KAIG3-RFI-CO-C-8046 00 KAIG3-RFI-CO-C-8046-00
KAIG3-RFI-CO-S-9557 00 KAIG3-RFI-CO-S-9557-00
KAIG3-RFI-CO-S-9559 00 KAIG3-RFI-CO-S-9559-00
KAIG3-RFI-CO-C-8069 00 KAIG3-RFI-CO-C-8069-00
KAIG3-RFI-DG-LS-1634 00 KAIG3-RFI-DG-LS-1634-00
KAIG3-RFI-WG-LS-1633 00 KAIG3-RFI-WG-LS-1633-00
KAIG3-RFI-WG-LS-1632 00 KAIG3-RFI-WG-LS-1632-00
KAIG3-RFI-SW-C-8106 00 KAIG3-RFI-SW-C-8106-00
KAIG3-RFI-SW-C-8105 00 KAIG3-RFI-SW-C-8105-00
KAIG3-RFI-WG-C-8104 00 KAIG3-RFI-WG-C-8104-00
KAIG3-RFI-WG-C-8103 00 KAIG3-RFI-WG-C-8103-00
KAIG3-RFI-TB-S-9590 00 KAIG3-RFI-TB-S-9590-00
KAIG3-RFI-SW-S-9589 00 KAIG3-RFI-SW-S-9589-00
KAIG3-RFI-MB-A-1134 00 KAIG3-RFI-MB-A-1134-00
KAIG3-RFI-AG-A-1133 00 KAIG3-RFI-AG-A-1133-00
KAIG3-RFI-MB-A-1132 00 KAIG3-RFI-MB-A-1132-00
KAIG3-RFI-WG-C-8084 00 KAIG3-RFI-WG-C-8084-00
KAIG3-RFI-DG-LS-1631 00 KAIG3-RFI-DG-LS-1631-00
KAIG3-RFI-DG-LS-1630 00 KAIG3-RFI-DG-LS-1630-00
KAIG3-RFI-TG-LS-1629 00 KAIG3-RFI-TG-LS-1629-00
KAIG3-RFI-MB-A-1131 00 KAIG3-RFI-MB-A-1131-00
KAIG3-RFI-WG-S-9575 00 KAIG3-RFI-WG-S-9575-00
KAIG3-RFI-WG-E-0600 00 KAIG3-RFI-WG-E-0600-00
KAIG3-RFI-TB-E-0602 00 KAIG3-RFI-TB-E-0602-00
KAIG3-RFI-PC-E-0252 01 KAIG3-RFI-PC-E-0252-01
KAIG3-RFI-TB-LC-0824 00 KAIG3-RFI-TB-LC-0824-00
KAIG3-RFI-NR-P-0327 00 KAIG3-RFI-NR-P-0327-00
KAIG3-RFI-SW-M-0326 00 KAIG3-RFI-SW-M-0326-00
KAIG3-RFI-TB-SU-3109 00 KAIG3-RFI-TB-SU-3109-00
KAIG3-RFI-WG-SU-3107 00 KAIG3-RFI-WG-SU-3107-00
KAIG3-RFI-WG-S-9273 02 KAIG3-RFI-WG-S-9273-02
KAIG3-RFI-WG-S-9272 01 KAIG3-RFI-WG-S-9272-01
KAIG3-RFI-WG-S-9567 00 KAIG3-RFI-WG-S-9567-00
KAIG3-RFI-WG-S-9566 00 KAIG3-RFI-WG-S-9566-00
KAIG3-RFI-WG-S-9564 00 KAIG3-RFI-WG-S-9564-00
KAIG3-RFI-WG-C-8082 00 KAIG3-RFI-WG-C-8082-00
KAIG3-RFI-WG-C-8081 00 KAIG3-RFI-WG-C-8081-00
KAIG3-RFI-PG-C-8070 00 KAIG3-RFI-PG-C-8070-00
KAIG3-RFI-TB-E-0601 00 KAIG3-RFI-TB-E-0601-00
KAIG3-RFI-SW-C-7293 01 KAIG3-RFI-SW-C-7293-01
KAIG3-RFI-CO-A-1120 00 KAIG3-RFI-CO-A-1120-00
KAIG3-RFI-CO-A-1121 00 KAIG3-RFI-CO-A-1121-00
KAIG3-RFI-MC-S-9560 00 KAIG3-RFI-MC-S-9560-00
KAIG3-RFI-MC-S-9561 00 KAIG3-RFI-MC-S-9561-00
KAIG3-RFI-LM-A-1129 00 KAIG3-RFI-LM-A-1129-00
KAIG3-RFI-LM-SU-3059 01 KAIG3-RFI-LM-SU-3059-01
KAIG3-RFI-CO-C-8068 00 KAIG3-RFI-CO-C-8068-00
KAIG3-RFI-RG-C-8067 00 KAIG3-RFI-RG-C-8067-00
KAIG3-RFI-CO-SU-3103 00 KAIG3-RFI-CO-SU-3103-00
KAIG3-RFI-CO-S-9554 00 KAIG3-RFI-CO-S-9554-00
KAIG3-RFI-CO-S-9553 00 KAIG3-RFI-CO-S-9553-00
KAIG3-RFI-CO-S-9552 00 KAIG3-RFI-CO-S-9552-00
KAIG3-RFI-LM-A-1128 00 KAIG3-RFI-LM-A-1128-00
KAIG3-RFI-CO-S-9502 00 KAIG3-RFI-CO-S-9502-00
KAIG3-RFI-CO-S-9501 00 KAIG3-RFI-CO-S-9501-00
KAIG3-RFI-CO-S-9500 00 KAIG3-RFI-CO-S-9500-00
KAIG3-RFI-PA-LS-1627 00 KAIG3-RFI-PA-LS-1627-00
KAIG3-RFI-SW-LS-1626 00 KAIG3-RFI-SW-LS-1626-00
KAIG3-RFI-SW-LS-1625 00 KAIG3-RFI-SW-LS-1625-00
KAIG3-RFI-SW-LS-1624 00 KAIG3-RFI-SW-LS-1624-00
KAIG3-RFI-SW-LS-1587 00 KAIG3-RFI-SW-LS-1587-00
KAIG3-RFI-SW-C-8072 00 KAIG3-RFI-SW-C-8072-00
KAIG3-RFI-SW-C-8071 00 KAIG3-RFI-SW-C-8071-00
KAIG3-RFI-SW-C-8065 00 KAIG3-RFI-SW-C-8065-00
KAIG3-RFI-SW-C-8063 00 KAIG3-RFI-SW-C-8063-00
KAIG3-RFI-SW-C-8062 00 KAIG3-RFI-SW-C-8062-00
KAIG3-RFI-SW-C-8061 00 KAIG3-RFI-SW-C-8061-00
KAIG3-RFI-SW-C-8060 00 KAIG3-RFI-SW-C-8060-00
KAIG3-RFI-SW-C-8058 00 KAIG3-RFI-SW-C-8058-00
KAIG3-RFI-SW-C-8057 00 KAIG3-RFI-SW-C-8057-00
KAIG3-RFI-SW-C-8056 00 KAIG3-RFI-SW-C-8056-00
KAIG3-RFI-SW-C-8055 00 KAIG3-RFI-SW-C-8055-00
KAIG3-RFI-SW-C-8054 00 KAIG3-RFI-SW-C-8054-00
KAIG3-RFI-SW-C-8053 00 KAIG3-RFI-SW-C-8053-00
KAIG3-RFI-SW-C-8052 00 KAIG3-RFI-SW-C-8052-00
KAIG3-RFI-SW-C-8051 00 KAIG3-RFI-SW-C-8051-00
KAIG3-RFI-SW-C-8045 00 KAIG3-RFI-SW-C-8045-00
KAIG3-RFI-WG-C-8066 00 KAIG3-RFI-WG-C-8066-00
KAIG3-RFI-ZG-C-8030 00 KAIG3-RFI-ZG-C-8030-00
KAIG3-RFI-PG-C-8029 00 KAIG3-RFI-PG-C-8029-00
KAIG3-RFI-DG-LS-1623 00 KAIG3-RFI-DG-LS-1623-00
KAIG3-RFI-DG-LS-1622 00 KAIG3-RFI-DG-LS-1622-00
KAIG3-RFI-DG-LS-1621 00 KAIG3-RFI-DG-LS-1621-00
KAIG3-RFI-DG-LS-1620 00 KAIG3-RFI-DG-LS-1620-00
KAIG3-RFI-PT-A-1127 00 KAIG3-RFI-PT-A-1127-00
KAIG3-RFI-FC-S-9545 00 KAIG3-RFI-FC-S-9545-00
KAIG3-RFI-MB-S-9544 00 KAIG3-RFI-MB-S-9544-00
KAIG3-RFI-TB-S-9543 00 KAIG3-RFI-TB-S-9543-00
KAIG3-RFI-SM-E-0598 00 KAIG3-RFI-SM-E-0598-00
KAIG3-RFI-PC-LC-0821 00 KAIG3-RFI-PC-LC-0821-00
KAIG3-RFI-PC-LC-0820 00 KAIG3-RFI-PC-LC-0820-00
KAIG3-RFI-CO-A-1117 00 KAIG3-RFI-CO-A-1117-00
KAIG3-RFI-CO-A-1116 00 KAIG3-RFI-CO-A-1116-00
KAIG3-RFI-CO-A-1115 00 KAIG3-RFI-CO-A-1115-00
KAIG3-RFI-CO-A-1114 00 KAIG3-RFI-CO-A-1114-00
KAIG3-RFI-CO-A-1113 00 KAIG3-RFI-CO-A-1113-00
KAIG3-RFI-CO-A-1118 00 KAIG3-RFI-CO-A-1118-00
KAIG3-RFI-CO-A-1108 00 KAIG3-RFI-CO-A-1108-00
KAIG3-RFI-CO-A-1111 00 KAIG3-RFI-CO-A-1111-00
KAIG3-RFI-JG-C-7491 00 KAIG3-RFI-JG-C-7491-00
KAIG3-RFI-SW-LS-1619 00 KAIG3-RFI-SW-LS-1619-00
KAIG3-RFI-SW-C-8044 00 KAIG3-RFI-SW-C-8044-00
KAIG3-RFI-SW-C-8043 00 KAIG3-RFI-SW-C-8043-00
KAIG3-RFI-SW-C-8042 00 KAIG3-RFI-SW-C-8042-00
KAIG3-RFI-SW-C-8041 00 KAIG3-RFI-SW-C-8041-00
KAIG3-RFI-SW-C-8040 00 KAIG3-RFI-SW-C-8040-00
KAIG3-RFI-SW-C-8039 00 KAIG3-RFI-SW-C-8039-00
KAIG3-RFI-SW-C-8037 00 KAIG3-RFI-SW-C-8037-00
KAIG3-RFI-SW-C-8036 00 KAIG3-RFI-SW-C-8036-00
KAIG3-RFI-SW-C-8035 00 KAIG3-RFI-SW-C-8035-00
KAIG3-RFI-SW-C-8034 00 KAIG3-RFI-SW-C-8034-00
KAIG3-RFI-SW-C-8033 00 KAIG3-RFI-SW-C-8033-00
KAIG3-RFI-SW-C-8032 00 KAIG3-RFI-SW-C-8032-00
KAIG3-RFI-SW-C-8031 00 KAIG3-RFI-SW-C-8031-00
KAIG3-RFI-SW-C-8015 00 KAIG3-RFI-SW-C-8015-00
KAIG3-RFI-RG-C-8050 00 KAIG3-RFI-RG-C-8050-00
KAIG3-RFI-RG-C-8049 00 KAIG3-RFI-RG-C-8049-00
KAIG3-RFI-SW-C-8014 00 KAIG3-RFI-SW-C-8014-00
KAIG3-RFI-SW-C-8013 00 KAIG3-RFI-SW-C-8013-00
KAIG3-RFI-CF-P-0325 00 KAIG3-RFI-CF-P-0325-00
KAIG3-RFI-SW-C-8012 00 KAIG3-RFI-SW-C-8012-00
KAIG3-RFI-SW-C-8011 00 KAIG3-RFI-SW-C-8011-00
KAIG3-RFI-PC-P-0324 00 KAIG3-RFI-PC-P-0324-00
KAIG3-RFI-SW-C-8010 00 KAIG3-RFI-SW-C-8010-00
KAIG3-RFI-SW-C-8009 00 KAIG3-RFI-SW-C-8009-00
KAIG3-RFI-SW-C-8008 00 KAIG3-RFI-SW-C-8008-00
KAIG3-RFI-SW-C-8007 00 KAIG3-RFI-SW-C-8007-00
KAIG3-RFI-SW-C-8006 00 KAIG3-RFI-SW-C-8006-00
KAIG3-RFI-SW-C-8005 00 KAIG3-RFI-SW-C-8005-00
KAIG3-RFI-SW-C-7996 00 KAIG3-RFI-SW-C-7996-00
KAIG3-RFI-CO-A-1110 00 KAIG3-RFI-CO-A-1110-00
KAIG3-RFI-CO-A-1109 00 KAIG3-RFI-CO-A-1109-00
KAIG3-RFI-JG-C-8048 00 KAIG3-RFI-JG-C-8048-00
KAIG3-RFI-VG-C-8047 00 KAIG3-RFI-VG-C-8047-00
KAIG3-RFI-EC-S-9540 00 KAIG3-RFI-EC-S-9540-00
KAIG3-RFI-EC-S-9541 00 KAIG3-RFI-EC-S-9541-00
KAIG3-RFI-EC-SU-3100 00 KAIG3-RFI-EC-SU-3100-00
KAIG3-RFI-MC-S-9547 00 KAIG3-RFI-MC-S-9547-00
KAIG3-RFI-MC-S-9548 00 KAIG3-RFI-MC-S-9548-00
KAIG3-RFI-MC-S-9549 00 KAIG3-RFI-MC-S-9549-00
KAIG3-RFI-MC-SU-3101 00 KAIG3-RFI-MC-SU-3101-00
KAIG3-RFI-CF-S-9542 00 KAIG3-RFI-CF-S-9542-00
KAIG3-RFI-CF-S-9543 00 KAIG3-RFI-CF-S-9543-00
KAIG3-RFI-CF-S-9544 00 KAIG3-RFI-CF-S-9544-00
KAIG3-RFI-CF-SU-3102 00 KAIG3-RFI-CF-SU-3102-00
KAIG3-RFI-CO-S-9532 00 KAIG3-RFI-CO-S-9532-00
KAIG3-RFI-CO-S-9533 00 KAIG3-RFI-CO-S-9533-00
KAIG3-RFI-CO-SU-3098 00 KAIG3-RFI-CO-SU-3098-00
KAIG3-RFI-WG-LS-1617 00 KAIG3-RFI-WG-LS-1617-00
KAIG3-RFI-CO-SS-0445 00 KAIG3-RFI-CO-SS-0445-00
KAIG3-RFI-CO-S-9534 00 KAIG3-RFI-CO-S-9534-00
KAIG3-RFI-CO-S-9535 00 KAIG3-RFI-CO-S-9535-00
KAIG3-RFI-WG-LS-1616 00 KAIG3-RFI-WG-LS-1616-00
KAIG3-RFI-CO-S-9536 00 KAIG3-RFI-CO-S-9536-00
KAIG3-RFI-WG-C-8028 00 KAIG3-RFI-WG-C-8028-00
KAIG3-RFI-CO-S-9537 00 KAIG3-RFI-CO-S-9537-00
KAIG3-RFI-CO-S-9538 00 KAIG3-RFI-CO-S-9538-00
KAIG3-RFI-WG-C-8025 00 KAIG3-RFI-WG-C-8025-00
KAIG3-RFI-CO-A-1112 00 KAIG3-RFI-CO-A-1112-00
KAIG3-RFI-WG-C-8024 00 KAIG3-RFI-WG-C-8024-00
KAIG3-RFI-PT-A-1125 00 KAIG3-RFI-PT-A-1125-00
KAIG3-RFI-WG-S-9518 00 KAIG3-RFI-WG-S-9518-00
KAIG3-RFI-TB-S-9513 00 KAIG3-RFI-TB-S-9513-00
KAIG3-RFI-CO-A-1105 00 KAIG3-RFI-CO-A-1105-00
KAIG3-RFI-CO-A-1126 00 KAIG3-RFI-CO-A-1126-00
KAIG3-RFI-TB-SU-3091 00 KAIG3-RFI-TB-SU-3091-00
KAIG3-RFI-CO-SU-3099 00 KAIG3-RFI-CO-SU-3099-00
KAIG3-RFI-CO-SU-3087 00 KAIG3-RFI-CO-SU-3087-00
KAIG3-RFI-CO-S-9499 00 KAIG3-RFI-CO-S-9499-00
KAIG3-RFI-CO-S-9531 00 KAIG3-RFI-CO-S-9531-00
KAIG3-RFI-CO-A-1106 00 KAIG3-RFI-CO-A-1106-00
KAIG3-RFI-CO-A-1104 00 KAIG3-RFI-CO-A-1104-00
KAIG3-RFI-CO-A-1103 00 KAIG3-RFI-CO-A-1103-00
KAIG3-RFI-CO-A-1107 00 KAIG3-RFI-CO-A-1107-00
KAIG3-RFI-CO-A-1097 00 KAIG3-RFI-CO-A-1097-00
KAIG3-RFI-CO-A-1100 00 KAIG3-RFI-CO-A-1100-00
KAIG3-RFI-CO-A-1101 00 KAIG3-RFI-CO-A-1101-00
KAIG3-RFI-CO-A-1102 00 KAIG3-RFI-CO-A-1102-00
KAIG3-RFI-CO-A-1095 00 KAIG3-RFI-CO-A-1095-00
KAIG3-RFI-CO-A-1088 00 KAIG3-RFI-CO-A-1088-00
KAIG3-RFI-CO-A-1087 00 KAIG3-RFI-CO-A-1087-00
KAIG3-RFI-CO-A-1086 00 KAIG3-RFI-CO-A-1086-00
KAIG3-RFI-CO-A-1085 00 KAIG3-RFI-CO-A-1085-00
KAIG3-RFI-CO-A-1084 00 KAIG3-RFI-CO-A-1084-00
KAIG3-RFI-CO-A-1083 00 KAIG3-RFI-CO-A-1083-00
KAIG3-RFI-CO-A-1082 00 KAIG3-RFI-CO-A-1082-00
KAIG3-RFI-CO-A-1069 01 KAIG3-RFI-CO-A-1069-01
KAIG3-RFI-SW-C-7968 00 KAIG3-RFI-SW-C-7968-00
KAIG3-RFI-PA-LS-1618 00 KAIG3-RFI-PA-LS-1618-00
KAIG3-RFI-SW-LS-1615 00 KAIG3-RFI-SW-LS-1615-00
KAIG3-RFI-SW-LS-1614 00 KAIG3-RFI-SW-LS-1614-00
KAIG3-RFI-SW-M-0291 02 KAIG3-RFI-SW-M-0291-02
KAIG3-RFI-SW-M-0290 02 KAIG3-RFI-SW-M-0290-02
KAIG3-RFI-SW-M-0309 01 KAIG3-RFI-SW-M-0309-01
KAIG3-RFI-VG-S-9522 00 KAIG3-RFI-VG-S-9522-00
KAIG3-RFI-SW-LS-1613 00 KAIG3-RFI-SW-LS-1613-00
KAIG3-RFI-SW-LS-1612 00 KAIG3-RFI-SW-LS-1612-00
KAIG3-RFI-SW-LS-1611 00 KAIG3-RFI-SW-LS-1611-00
KAIG3-RFI-EC-S-9492 00 KAIG3-RFI-EC-S-9492-00
KAIG3-RFI-CO-SU-3084 00 KAIG3-RFI-CO-SU-3084-00
KAIG3-RFI-CO-S-9493 00 KAIG3-RFI-CO-S-9493-00
KAIG3-RFI-CO-S-9494 00 KAIG3-RFI-CO-S-9494-00
KAIG3-RFI-CO-SU-3085 00 KAIG3-RFI-CO-SU-3085-00
KAIG3-RFI-MC-S-9495 00 KAIG3-RFI-MC-S-9495-00
KAIG3-RFI-MC-S-9496 00 KAIG3-RFI-MC-S-9496-00
KAIG3-RFI-MC-SU-3086 00 KAIG3-RFI-MC-SU-3086-00
KAIG3-RFI-EC-A-1098 00 KAIG3-RFI-EC-A-1098-00
KAIG3-RFI-EC-C-8001 00 KAIG3-RFI-EC-C-8001-00
KAIG3-RFI-CO-S-9498 00 KAIG3-RFI-CO-S-9498-00
KAIG3-RFI-CO-C-8019 00 KAIG3-RFI-CO-C-8019-00
KAIG3-RFI-CO-C-8020 00 KAIG3-RFI-CO-C-8020-00
KAIG3-RFI-CO-C-8021 00 KAIG3-RFI-CO-C-8021-00
KAIG3-RFI-EC-S-9524 00 KAIG3-RFI-EC-S-9524-00
KAIG3-RFI-CO-S-9525 00 KAIG3-RFI-CO-S-9525-00
KAIG3-RFI-CO-S-9520 00 KAIG3-RFI-CO-S-9520-00
KAIG3-RFI-CO-S-9519 00 KAIG3-RFI-CO-S-9519-00
KAIG3-RFI-VG-C-8022 00 KAIG3-RFI-VG-C-8022-00
KAIG3-RFI-VG-C-8023 00 KAIG3-RFI-VG-C-8023-00
KAIG3-RFI-EC-C-8027 00 KAIG3-RFI-EC-C-8027-00
KAIG3-RFI-EC-SU-3095 00 KAIG3-RFI-EC-SU-3095-00
KAIG3-RFI-EC-SU-3096 00 KAIG3-RFI-EC-SU-3096-00
KAIG3-RFI-CF-S-9527 00 KAIG3-RFI-CF-S-9527-00
KAIG3-RFI-CC-S-9528 00 KAIG3-RFI-CC-S-9528-00
KAIG3-RFI-CC-S-9529 00 KAIG3-RFI-CC-S-9529-00
KAIG3-RFI-CC-S-9530 00 KAIG3-RFI-CC-S-9530-00
KAIG3-RFI-CF-LC-0818 00 KAIG3-RFI-CF-LC-0818-00
KAIG3-RFI-CC-SU-3097 00 KAIG3-RFI-CC-SU-3097-00
KAIG3-RFI-CF-LC-0817 00 KAIG3-RFI-CF-LC-0817-00
KAIG3-RFI-EC-S-9526 00 KAIG3-RFI-EC-S-9526-00
KAIG3-RFI-CO-S-9507 00 KAIG3-RFI-CO-S-9507-00
KAIG3-RFI-CO-SU-3090 00 KAIG3-RFI-CO-SU-3090-00
KAIG3-RFI-VG-C-8016 00 KAIG3-RFI-VG-C-8016-00
KAIG3-RFI-VG-S-9506 00 KAIG3-RFI-VG-S-9506-00
KAIG3-RFI-VG-S-9514 00 KAIG3-RFI-VG-S-9514-00
KAIG3-RFI-VG-S-9515 00 KAIG3-RFI-VG-S-9515-00
KAIG3-RFI-VG-C-8026 00 KAIG3-RFI-VG-C-8026-00
KAIG3-RFI-SM-S-9509 00 KAIG3-RFI-SM-S-9509-00
KAIG3-RFI-RG-C-8017 00 KAIG3-RFI-RG-C-8017-00
KAIG3-RFI-CO-C-8018 00 KAIG3-RFI-CO-C-8018-00
KAIG3-RFI-CO-S-9503 00 KAIG3-RFI-CO-S-9503-00
KAIG3-RFI-CF-S-9504 00 KAIG3-RFI-CF-S-9504-00
KAIG3-RFI-CF-S-9505 00 KAIG3-RFI-CF-S-9505-00
KAIG3-RFI-CF-SU-3088 00 KAIG3-RFI-CF-SU-3088-00
KAIG3-RFI-CO-S-9510 00 KAIG3-RFI-CO-S-9510-00
KAIG3-RFI-CO-S-9511 00 KAIG3-RFI-CO-S-9511-00
KAIG3-RFI-CO-S-9512 00 KAIG3-RFI-CO-S-9512-00
KAIG3-RFI-CO-A-1122 00 KAIG3-RFI-CO-A-1122-00
KAIG3-RFI-CO-A-1123 00 KAIG3-RFI-CO-A-1123-00
KAIG3-RFI-TG-E-0599 00 KAIG3-RFI-TG-E-0599-00
KAIG3-RFI-SW-C-7912 00 KAIG3-RFI-SW-C-7912-00
KAIG3-RFI-PT-A-1099 00 KAIG3-RFI-PT-A-1099-00
KAIG3-RFI-WG-LS-1608 00 KAIG3-RFI-WG-LS-1608-00
KAIG3-RFI-PG-LS-1607 00 KAIG3-RFI-PG-LS-1607-00
KAIG3-RFI-PG-C-7971 00 KAIG3-RFI-PG-C-7971-00
KAIG3-RFI-WG-P-0323 00 KAIG3-RFI-WG-P-0323-00
KAIG3-RFI-SW-M-0322 00 KAIG3-RFI-SW-M-0322-00
KAIG3-RFI-SW-M-0321 00 KAIG3-RFI-SW-M-0321-00
KAIG3-RFI-SM-P-0320 00 KAIG3-RFI-SM-P-0320-00
KAIG3-RFI-CC-M-0304 01 KAIG3-RFI-CC-M-0304-01
KAIG3-RFI-DG-LS-1610 00 KAIG3-RFI-DG-LS-1610-00
KAIG3-RFI-DG-LS-1609 00 KAIG3-RFI-DG-LS-1609-00
KAIG3-RFI-SW-C-8003 00 KAIG3-RFI-SW-C-8003-00
KAIG3-RFI-SW-C-8002 00 KAIG3-RFI-SW-C-8002-00
KAIG3-RFI-SW-C-8000 00 KAIG3-RFI-SW-C-8000-00
KAIG3-RFI-SW-C-7999 00 KAIG3-RFI-SW-C-7999-00
KAIG3-RFI-SW-C-7998 00 KAIG3-RFI-SW-C-7998-00
KAIG3-RFI-SW-C-7997 00 KAIG3-RFI-SW-C-7997-00
KAIG3-RFI-SW-C-7995 00 KAIG3-RFI-SW-C-7995-00
KAIG3-RFI-SW-C-7994 00 KAIG3-RFI-SW-C-7994-00
KAIG3-RFI-SW-C-7990 00 KAIG3-RFI-SW-C-7990-00
KAIG3-RFI-SW-C-7989 00 KAIG3-RFI-SW-C-7989-00
KAIG3-RFI-SW-C-7988 00 KAIG3-RFI-SW-C-7988-00
KAIG3-RFI-SW-C-7987 00 KAIG3-RFI-SW-C-7987-00
KAIG3-RFI-SW-C-7986 00 KAIG3-RFI-SW-C-7986-00
KAIG3-RFI-SW-C-7954 00 KAIG3-RFI-SW-C-7954-00
KAIG3-RFI-SW-C-7953 00 KAIG3-RFI-SW-C-7953-00
KAIG3-RFI-SW-C-7985 00 KAIG3-RFI-SW-C-7985-00
KAIG3-RFI-MB-SS-0379 01 KAIG3-RFI-MB-SS-0379-01
KAIG3-RFI-MB-SS-0378 01 KAIG3-RFI-MB-SS-0378-01
KAIG3-RFI-PG-C-7993 00 KAIG3-RFI-PG-C-7993-00
KAIG3-RFI-WG-C-7992 00 KAIG3-RFI-WG-C-7992-00
KAIG3-RFI-WG-C-7991 00 KAIG3-RFI-WG-C-7991-00
KAIG3-RFI-ZG-C-7972 00 KAIG3-RFI-ZG-C-7972-00
KAIG3-RFI-WG-SU-3083 00 KAIG3-RFI-WG-SU-3083-00
KAIG3-RFI-WG-SU-3082 00 KAIG3-RFI-WG-SU-3082-00
KAIG3-RFI-PG-SU-3079 00 KAIG3-RFI-PG-SU-3079-00
KAIG3-RFI-WG-SU-3078 00 KAIG3-RFI-WG-SU-3078-00
KAIG3-RFI-EC-C-7979 00 KAIG3-RFI-EC-C-7979-00
KAIG3-RFI-CO-S-9481 00 KAIG3-RFI-CO-S-9481-00
KAIG3-RFI-CO-S-9482 00 KAIG3-RFI-CO-S-9482-00
KAIG3-RFI-CO-S-9483 00 KAIG3-RFI-CO-S-9483-00
KAIG3-RFI-CO-S-9484 00 KAIG3-RFI-CO-S-9484-00
KAIG3-RFI-PG-S-9478 00 KAIG3-RFI-PG-S-9478-00
KAIG3-RFI-EC-S-9488 00 KAIG3-RFI-EC-S-9488-00
KAIG3-RFI-CO-S-9485 00 KAIG3-RFI-CO-S-9485-00
KAIG3-RFI-EC-S-9486 00 KAIG3-RFI-EC-S-9486-00
KAIG3-RFI-EC-SU-3080 00 KAIG3-RFI-EC-SU-3080-00
KAIG3-RFI-WG-S-9477 00 KAIG3-RFI-WG-S-9477-00
KAIG3-RFI-EC-S-9487 00 KAIG3-RFI-EC-S-9487-00
KAIG3-RFI-TG-S-9476 00 KAIG3-RFI-TG-S-9476-00
KAIG3-RFI-EC-SU-3081 00 KAIG3-RFI-EC-SU-3081-00
KAIG3-RFI-PG-S-9463 00 KAIG3-RFI-PG-S-9463-00
KAIG3-RFI-CO-C-7976 00 KAIG3-RFI-CO-C-7976-00
KAIG3-RFI-CO-S-9489 00 KAIG3-RFI-CO-S-9489-00
KAIG3-RFI-TT-A-1093 00 KAIG3-RFI-TT-A-1093-00
KAIG3-RFI-CO-S-9490 00 KAIG3-RFI-CO-S-9490-00
KAIG3-RFI-TT-A-1092 00 KAIG3-RFI-TT-A-1092-00
KAIG3-RFI-PG-A-1091 00 KAIG3-RFI-PG-A-1091-00
KAIG3-RFI-CO-S-9491 00 KAIG3-RFI-CO-S-9491-00
KAIG3-RFI-RG-C-7973 00 KAIG3-RFI-RG-C-7973-00
KAIG3-RFI-ZG-A-1090 00 KAIG3-RFI-ZG-A-1090-00
KAIG3-RFI-RG-C-7974 00 KAIG3-RFI-RG-C-7974-00
KAIG3-RFI-DG-A-1089 00 KAIG3-RFI-DG-A-1089-00
KAIG3-RFI-CO-C-7975 00 KAIG3-RFI-CO-C-7975-00
KAIG3-RFI-CO-C-7977 00 KAIG3-RFI-CO-C-7977-00
KAIG3-RFI-CO-C-7978 00 KAIG3-RFI-CO-C-7978-00
KAIG3-RFI-VG-S-9381 01 KAIG3-RFI-VG-S-9381-01
KAIG3-RFI-VG-S-9382 00 KAIG3-RFI-VG-S-9382-00
KAIG3-RFI-CO-S-8249 00 KAIG3-RFI-CO-S-8249-00
KAIG3-RFI-CO-S-9403 00 KAIG3-RFI-CO-S-9403-00
KAIG3-RFI-CO-S-9472 00 KAIG3-RFI-CO-S-9472-00
KAIG3-RFI-CO-S-9474 00 KAIG3-RFI-CO-S-9474-00
KAIG3-RFI-CO-S-9473 00 KAIG3-RFI-CO-S-9473-00
KAIG3-RFI-CO-SU-3077 00 KAIG3-RFI-CO-SU-3077-00
KAIG3-RFI-CO-S-9475 00 KAIG3-RFI-CO-S-9475-00
KAIG3-RFI-CO-S-9479 00 KAIG3-RFI-CO-S-9479-00
KAIG3-RFI-CO-S-9480 00 KAIG3-RFI-CO-S-9480-00
KAIG3-RFI-CO-A-1094 00 KAIG3-RFI-CO-A-1094-00
KAIG3-RFI-CO-A-1066 00 KAIG3-RFI-CO-A-1066-00
KAIG3-RFI-CO-S-9401 00 KAIG3-RFI-CO-S-9401-00
KAIG3-RFI-VG-S-9453 00 KAIG3-RFI-VG-S-9453-00
KAIG3-RFI-TG-LS-1606 00 KAIG3-RFI-TG-LS-1606-00
KAIG3-RFI-TG-LS-1605 00 KAIG3-RFI-TG-LS-1605-00
KAIG3-RFI-WG-C-7952 00 KAIG3-RFI-WG-C-7952-00
KAIG3-RFI-SG-C-7944 00 KAIG3-RFI-SG-C-7944-00
KAIG3-RFI-WG-C-7943 00 KAIG3-RFI-WG-C-7943-00
KAIG3-RFI-WG-C-7942 00 KAIG3-RFI-WG-C-7942-00
KAIG3-RFI-WG-C-7941 00 KAIG3-RFI-WG-C-7941-00
KAIG3-RFI-WG-A-1078 00 KAIG3-RFI-WG-A-1078-00
KAIG3-RFI-SW-C-7984 00 KAIG3-RFI-SW-C-7984-00
KAIG3-RFI-SW-C-7983 00 KAIG3-RFI-SW-C-7983-00
KAIG3-RFI-SW-C-7982 00 KAIG3-RFI-SW-C-7982-00
KAIG3-RFI-SW-C-7981 00 KAIG3-RFI-SW-C-7981-00
KAIG3-RFI-SW-C-7980 00 KAIG3-RFI-SW-C-7980-00
KAIG3-RFI-SW-C-7970 00 KAIG3-RFI-SW-C-7970-00
KAIG3-RFI-SW-C-7969 00 KAIG3-RFI-SW-C-7969-00
KAIG3-RFI-SW-C-7967 00 KAIG3-RFI-SW-C-7967-00
KAIG3-RFI-SW-C-7966 00 KAIG3-RFI-SW-C-7966-00
KAIG3-RFI-SW-C-7965 00 KAIG3-RFI-SW-C-7965-00
KAIG3-RFI-WG-S-9462 00 KAIG3-RFI-WG-S-9462-00
KAIG3-RFI-SW-C-7964 00 KAIG3-RFI-SW-C-7964-00
KAIG3-RFI-SW-C-7963 00 KAIG3-RFI-SW-C-7963-00
KAIG3-RFI-SW-C-7962 00 KAIG3-RFI-SW-C-7962-00
KAIG3-RFI-SW-C-7961 00 KAIG3-RFI-SW-C-7961-00
KAIG3-RFI-SW-C-7960 00 KAIG3-RFI-SW-C-7960-00
KAIG3-RFI-SW-C-7959 00 KAIG3-RFI-SW-C-7959-00
KAIG3-RFI-SW-C-7958 00 KAIG3-RFI-SW-C-7958-00
KAIG3-RFI-SW-C-7957 00 KAIG3-RFI-SW-C-7957-00
KAIG3-RFI-SW-C-7956 00 KAIG3-RFI-SW-C-7956-00
KAIG3-RFI-SW-C-7955 00 KAIG3-RFI-SW-C-7955-00
KAIG3-RFI-SW-LS-1599 00 KAIG3-RFI-SW-LS-1599-00
KAIG3-RFI-SW-C-7940 00 KAIG3-RFI-SW-C-7940-00
KAIG3-RFI-SW-C-7939 00 KAIG3-RFI-SW-C-7939-00
KAIG3-RFI-SW-C-7938 00 KAIG3-RFI-SW-C-7938-00
KAIG3-RFI-SW-C-7937 00 KAIG3-RFI-SW-C-7937-00
KAIG3-RFI-SW-C-7936 00 KAIG3-RFI-SW-C-7936-00
KAIG3-RFI-SW-C-7935 00 KAIG3-RFI-SW-C-7935-00
KAIG3-RFI-SW-C-7934 00 KAIG3-RFI-SW-C-7934-00
KAIG3-RFI-SW-C-7933 00 KAIG3-RFI-SW-C-7933-00
KAIG3-RFI-SW-C-7932 00 KAIG3-RFI-SW-C-7932-00
KAIG3-RFI-SW-C-7931 00 KAIG3-RFI-SW-C-7931-00
KAIG3-RFI-SW-C-7930 00 KAIG3-RFI-SW-C-7930-00
KAIG3-RFI-SW-C-7929 00 KAIG3-RFI-SW-C-7929-00
KAIG3-RFI-SW-C-7920 00 KAIG3-RFI-SW-C-7920-00
KAIG3-RFI-SW-C-7919 00 KAIG3-RFI-SW-C-7919-00
KAIG3-RFI-SW-C-7918 00 KAIG3-RFI-SW-C-7918-00
KAIG3-RFI-SW-C-7917 00 KAIG3-RFI-SW-C-7917-00
KAIG3-RFI-SW-C-7916 00 KAIG3-RFI-SW-C-7916-00
KAIG3-RFI-SW-C-7948 00 KAIG3-RFI-SW-C-7948-00
KAIG3-RFI-SW-C-7947 00 KAIG3-RFI-SW-C-7947-00
KAIG3-RFI-SW-C-7946 00 KAIG3-RFI-SW-C-7946-00
KAIG3-RFI-SW-C-7945 00 KAIG3-RFI-SW-C-7945-00
KAIG3-RFI-PG-C-7907 00 KAIG3-RFI-PG-C-7907-00
KAIG3-RFI-ZG-LS-1604 00 KAIG3-RFI-ZG-LS-1604-00
KAIG3-RFI-SG-LS-1603 00 KAIG3-RFI-SG-LS-1603-00
KAIG3-RFI-PG-LS-1602 00 KAIG3-RFI-PG-LS-1602-00
KAIG3-RFI-SW-LS-1601 00 KAIG3-RFI-SW-LS-1601-00
KAIG3-RFI-SW-LS-1600 00 KAIG3-RFI-SW-LS-1600-00
KAIG3-RFI-CO-S-9471 00 KAIG3-RFI-CO-S-9471-00
KAIG3-RFI-CO-SU-3076 00 KAIG3-RFI-CO-SU-3076-00
KAIG3-RFI-MC-S-9467 00 KAIG3-RFI-MC-S-9467-00
KAIG3-RFI-MC-S-9468 00 KAIG3-RFI-MC-S-9468-00
KAIG3-RFI-WG-LS-1599 00 KAIG3-RFI-WG-LS-1599-00
KAIG3-RFI-MC-SU-3075 00 KAIG3-RFI-MC-SU-3075-00
KAIG3-RFI-WG-LS-1598 00 KAIG3-RFI-WG-LS-1598-00
KAIG3-RFI-WG-C-7890 00 KAIG3-RFI-WG-C-7890-00
KAIG3-RFI-RG-C-7949 00 KAIG3-RFI-RG-C-7949-00
KAIG3-RFI-WG-C-7889 00 KAIG3-RFI-WG-C-7889-00
KAIG3-RFI-RG-C-7950 00 KAIG3-RFI-RG-C-7950-00
KAIG3-RFI-ZG-C-7875 00 KAIG3-RFI-ZG-C-7875-00
KAIG3-RFI-VG-C-7951 00 KAIG3-RFI-VG-C-7951-00
KAIG3-RFI-CO-S-9464 00 KAIG3-RFI-CO-S-9464-00
KAIG3-RFI-CO-S-9465 00 KAIG3-RFI-CO-S-9465-00
KAIG3-RFI-MB-A-1080 00 KAIG3-RFI-MB-A-1080-00
KAIG3-RFI-CO-S-9470 00 KAIG3-RFI-CO-S-9470-00
KAIG3-RFI-CO-S-9466 00 KAIG3-RFI-CO-S-9466-00
KAIG3-RFI-WG-A-1079 00 KAIG3-RFI-WG-A-1079-00
KAIG3-RFI-RG-C-7928 00 KAIG3-RFI-RG-C-7928-00
KAIG3-RFI-RG-SU-3073 00 KAIG3-RFI-RG-SU-3073-00
KAIG3-RFI-PG-SU-3066 00 KAIG3-RFI-PG-SU-3066-00
KAIG3-RFI-CO-A-1079 00 KAIG3-RFI-CO-A-1079-00
KAIG3-RFI-CO-A-1080 00 KAIG3-RFI-CO-A-1080-00
KAIG3-RFI-PG-S-9448 00 KAIG3-RFI-PG-S-9448-00
KAIG3-RFI-CO-A-1081 00 KAIG3-RFI-CO-A-1081-00
KAIG3-RFI-CF-S-9460 00 KAIG3-RFI-CF-S-9460-00
KAIG3-RFI-PG-S-9447 00 KAIG3-RFI-PG-S-9447-00
KAIG3-RFI-CO-S-5122 01 KAIG3-RFI-CO-S-5122-01
KAIG3-RFI-TB-S-9446 00 KAIG3-RFI-TB-S-9446-00
KAIG3-RFI-CO-S-9469 00 KAIG3-RFI-CO-S-9469-00
KAIG3-RFI-MB-SS-0379 00 KAIG3-RFI-MB-SS-0379-00
KAIG3-RFI-MB-SS-0378 00 KAIG3-RFI-MB-SS-0378-00
KAIG3-RFI-TB-LC-0815 00 KAIG3-RFI-TB-LC-0815-00
KAIG3-RFI-TB-E-0561 00 KAIG3-RFI-TB-E-0561-00
KAIG3-RFI-TB-E-0599 00 KAIG3-RFI-TB-E-0599-00
KAIG3-RFI-CO-SU-3072 00 KAIG3-RFI-CO-SU-3072-00
KAIG3-RFI-LM-S-9330 01 KAIG3-RFI-LM-S-9330-01
KAIG3-RFI-CO-S-9455 00 KAIG3-RFI-CO-S-9455-00
KAIG3-RFI-CO-SU-3071 00 KAIG3-RFI-CO-SU-3071-00
KAIG3-RFI-CF-S-9457 00 KAIG3-RFI-CF-S-9457-00
KAIG3-RFI-RG-C-7921 00 KAIG3-RFI-RG-C-7921-00
KAIG3-RFI-CO-C-7922 00 KAIG3-RFI-CO-C-7922-00
KAIG3-RFI-CO-C-7923 00 KAIG3-RFI-CO-C-7923-00
KAIG3-RFI-CO-C-7924 00 KAIG3-RFI-CO-C-7924-00
KAIG3-RFI-LM-S-9331 01 KAIG3-RFI-LM-S-9331-01
KAIG3-RFI-EC-A-1070 01 KAIG3-RFI-EC-A-1070-01
KAIG3-RFI-CO-C-7926 00 KAIG3-RFI-CO-C-7926-00
KAIG3-RFI-CO-C-7925 00 KAIG3-RFI-CO-C-7925-00
KAIG3-RFI-CF-S-9450 00 KAIG3-RFI-CF-S-9450-00
KAIG3-RFI-CF-S-9451 00 KAIG3-RFI-CF-S-9451-00
KAIG3-RFI-CF-SU-3069 00 KAIG3-RFI-CF-SU-3069-00
KAIG3-RFI-VG-S-9456 00 KAIG3-RFI-VG-S-9456-00
KAIG3-RFI-VG-S-9452 00 KAIG3-RFI-VG-S-9452-00
KAIG3-RFI-VG-SU-3070 00 KAIG3-RFI-VG-SU-3070-00
KAIG3-RFI-CO-S-9454 00 KAIG3-RFI-CO-S-9454-00
KAIG3-RFI-CO-S-9441 00 KAIG3-RFI-CO-S-9441-00
KAIG3-RFI-CO-S-9442 00 KAIG3-RFI-CO-S-9442-00
KAIG3-RFI-CO-S-9443 00 KAIG3-RFI-CO-S-9443-00
KAIG3-RFI-SW-C-7915 00 KAIG3-RFI-SW-C-7915-00
KAIG3-RFI-SW-C-7914 00 KAIG3-RFI-SW-C-7914-00
KAIG3-RFI-SW-C-7913 00 KAIG3-RFI-SW-C-7913-00
KAIG3-RFI-SW-C-7911 00 KAIG3-RFI-SW-C-7911-00
KAIG3-RFI-SW-C-7910 00 KAIG3-RFI-SW-C-7910-00
KAIG3-RFI-SW-C-7909 00 KAIG3-RFI-SW-C-7909-00
KAIG3-RFI-SW-C-7908 00 KAIG3-RFI-SW-C-7908-00
KAIG3-RFI-SW-C-7900 00 KAIG3-RFI-SW-C-7900-00
KAIG3-RFI-SW-C-7899 00 KAIG3-RFI-SW-C-7899-00
KAIG3-RFI-SW-C-7824 01 KAIG3-RFI-SW-C-7824-01
KAIG3-RFI-SW-C-7789 01 KAIG3-RFI-SW-C-7789-01
KAIG3-RFI-SW-C-7228 01 KAIG3-RFI-SW-C-7228-01
KAIG3-RFI-SW-C-6980 02 KAIG3-RFI-SW-C-6980-02
KAIG3-RFI-SW-C-7898 00 KAIG3-RFI-SW-C-7898-00
KAIG3-RFI-SW-C-7897 00 KAIG3-RFI-SW-C-7897-00
KAIG3-RFI-CO-SU-3064 00 KAIG3-RFI-CO-SU-3064-00
KAIG3-RFI-CO-S-9318 01 KAIG3-RFI-CO-S-9318-01
KAIG3-RFI-CO-S-9444 00 KAIG3-RFI-CO-S-9444-00
KAIG3-RFI-CO-S-9445 00 KAIG3-RFI-CO-S-9445-00
KAIG3-RFI-CO-SU-3065 00 KAIG3-RFI-CO-SU-3065-00
KAIG3-RFI-CO-S-9446 00 KAIG3-RFI-CO-S-9446-00
KAIG3-RFI-CO-S-9447 00 KAIG3-RFI-CO-S-9447-00
KAIG3-RFI-SW-M-0319 00 KAIG3-RFI-SW-M-0319-00
KAIG3-RFI-SW-C-7896 00 KAIG3-RFI-SW-C-7896-00
KAIG3-RFI-SW-C-7895 00 KAIG3-RFI-SW-C-7895-00
KAIG3-RFI-SW-M-0318 00 KAIG3-RFI-SW-M-0318-00
KAIG3-RFI-SW-C-7894 00 KAIG3-RFI-SW-C-7894-00
KAIG3-RFI-SW-M-0317 00 KAIG3-RFI-SW-M-0317-00
KAIG3-RFI-SW-C-7893 00 KAIG3-RFI-SW-C-7893-00
KAIG3-RFI-CO-SU-3066 00 KAIG3-RFI-CO-SU-3066-00
KAIG3-RFI-SW-C-7892 00 KAIG3-RFI-SW-C-7892-00
KAIG3-RFI-EC-S-9448 00 KAIG3-RFI-EC-S-9448-00
KAIG3-RFI-SW-C-7891 00 KAIG3-RFI-SW-C-7891-00
KAIG3-RFI-EC-S-9449 00 KAIG3-RFI-EC-S-9449-00
KAIG3-RFI-SW-C-7885 00 KAIG3-RFI-SW-C-7885-00
KAIG3-RFI-EC-SU-3067 00 KAIG3-RFI-EC-SU-3067-00
KAIG3-RFI-SW-C-7884 00 KAIG3-RFI-SW-C-7884-00
KAIG3-RFI-LM-SU-3068 00 KAIG3-RFI-LM-SU-3068-00
KAIG3-RFI-MC-S-9437 00 KAIG3-RFI-MC-S-9437-00
KAIG3-RFI-SW-C-7883 00 KAIG3-RFI-SW-C-7883-00
KAIG3-RFI-MC-S-9438 00 KAIG3-RFI-MC-S-9438-00
KAIG3-RFI-MC-S-9439 00 KAIG3-RFI-MC-S-9439-00
KAIG3-RFI-SW-C-7882 00 KAIG3-RFI-SW-C-7882-00
KAIG3-RFI-MC-SU-3063 00 KAIG3-RFI-MC-SU-3063-00
KAIG3-RFI-MC-S-9440 00 KAIG3-RFI-MC-S-9440-00
KAIG3-RFI-LM-SU-3059 00 KAIG3-RFI-LM-SU-3059-00
KAIG3-RFI-LM-S-9432 00 KAIG3-RFI-LM-S-9432-00
KAIG3-RFI-LM-S-9431 00 KAIG3-RFI-LM-S-9431-00
KAIG3-RFI-CO-S-8952 01 KAIG3-RFI-CO-S-8952-01
KAIG3-RFI-RG-C-7771 00 KAIG3-RFI-RG-C-7771-00
KAIG3-RFI-SW-LC-0770 01 KAIG3-RFI-SW-LC-0770-01
KAIG3-RFI-MC-SU-3046 00 KAIG3-RFI-MC-SU-3046-00
KAIG3-RFI-CO-S-9399 00 KAIG3-RFI-CO-S-9399-00
KAIG3-RFI-CO-S-9434 00 KAIG3-RFI-CO-S-9434-00
KAIG3-RFI-PC-S-9435 00 KAIG3-RFI-PC-S-9435-00
KAIG3-RFI-PC-SU-3062 00 KAIG3-RFI-PC-SU-3062-00
KAIG3-RFI-WG-C-7644 01 KAIG3-RFI-WG-C-7644-01
KAIG3-RFI-SW-C-7850 00 KAIG3-RFI-SW-C-7850-00
KAIG3-RFI-WG-C-7643 01 KAIG3-RFI-WG-C-7643-01
KAIG3-RFI-WG-C-7703 01 KAIG3-RFI-WG-C-7703-01
KAIG3-RFI-WG-C-7702 01 KAIG3-RFI-WG-C-7702-01
KAIG3-RFI-WG-C-7874 00 KAIG3-RFI-WG-C-7874-00
KAIG3-RFI-WG-C-7873 00 KAIG3-RFI-WG-C-7873-00
KAIG3-RFI-PG-S-9370 00 KAIG3-RFI-PG-S-9370-00
KAIG3-RFI-MB-A-1074 00 KAIG3-RFI-MB-A-1074-00
KAIG3-RFI-VG-S-9383 00 KAIG3-RFI-VG-S-9383-00
KAIG3-RFI-MB-A-1073 00 KAIG3-RFI-MB-A-1073-00
KAIG3-RFI-CO-SU-3061 00 KAIG3-RFI-CO-SU-3061-00
KAIG3-RFI-CO-S-9433 00 KAIG3-RFI-CO-S-9433-00
KAIG3-RFI-CO-SU-3060 00 KAIG3-RFI-CO-SU-3060-00
KAIG3-RFI-WG-LS-1595 00 KAIG3-RFI-WG-LS-1595-00
KAIG3-RFI-PC-S-9429 00 KAIG3-RFI-PC-S-9429-00
KAIG3-RFI-CO-A-1077 00 KAIG3-RFI-CO-A-1077-00
KAIG3-RFI-WG-LS-1594 00 KAIG3-RFI-WG-LS-1594-00
KAIG3-RFI-CO-S-9428 00 KAIG3-RFI-CO-S-9428-00
KAIG3-RFI-MB-E-0596 00 KAIG3-RFI-MB-E-0596-00
KAIG3-RFI-CO-S-9426 00 KAIG3-RFI-CO-S-9426-00
KAIG3-RFI-RG-C-7901 00 KAIG3-RFI-RG-C-7901-00
KAIG3-RFI-CO-C-7902 00 KAIG3-RFI-CO-C-7902-00
KAIG3-RFI-WG-LS-1593 00 KAIG3-RFI-WG-LS-1593-00
KAIG3-RFI-CO-C-7903 00 KAIG3-RFI-CO-C-7903-00
KAIG3-RFI-LG-C-7906 00 KAIG3-RFI-LG-C-7906-00
KAIG3-RFI-CO-C-7905 00 KAIG3-RFI-CO-C-7905-00
KAIG3-RFI-CO-C-7904 00 KAIG3-RFI-CO-C-7904-00
KAIG3-RFI-CO-S-9430 00 KAIG3-RFI-CO-S-9430-00
KAIG3-RFI-CF-S-9427 00 KAIG3-RFI-CF-S-9427-00
KAIG3-RFI-MC-SU-3057 00 KAIG3-RFI-MC-SU-3057-00
KAIG3-RFI-MC-S-9425 00 KAIG3-RFI-MC-S-9425-00
KAIG3-RFI-CO-S-9414 00 KAIG3-RFI-CO-S-9414-00
KAIG3-RFI-WG-LS-1592 00 KAIG3-RFI-WG-LS-1592-00
KAIG3-RFI-CO-S-9343 00 KAIG3-RFI-CO-S-9343-00
KAIG3-RFI-MC-S-9424 00 KAIG3-RFI-MC-S-9424-00
KAIG3-RFI-TG-SU-3055 00 KAIG3-RFI-TG-SU-3055-00
KAIG3-RFI-CO-A-1076 00 KAIG3-RFI-CO-A-1076-00
KAIG3-RFI-CO-S-9423 00 KAIG3-RFI-CO-S-9423-00
KAIG3-RFI-CO-S-9396 00 KAIG3-RFI-CO-S-9396-00
KAIG3-RFI-ST-S-9418 00 KAIG3-RFI-ST-S-9418-00
KAIG3-RFI-ST-S-9419 00 KAIG3-RFI-ST-S-9419-00
KAIG3-RFI-SW-C-7764 00 KAIG3-RFI-SW-C-7764-00
KAIG3-RFI-ST-S-9420 00 KAIG3-RFI-ST-S-9420-00
KAIG3-RFI-CO-S-9421 00 KAIG3-RFI-CO-S-9421-00
KAIG3-RFI-CO-S-9422 00 KAIG3-RFI-CO-S-9422-00
KAIG3-RFI-CO-SU-3056 00 KAIG3-RFI-CO-SU-3056-00
KAIG3-RFI-MC-S-9380 00 KAIG3-RFI-MC-S-9380-00
KAIG3-RFI-CO-SU-3058 00 KAIG3-RFI-CO-SU-3058-00
KAIG3-RFI-CO-SS-0427 00 KAIG3-RFI-CO-SS-0427-00
KAIG3-RFI-CO-S-9413 00 KAIG3-RFI-CO-S-9413-00
KAIG3-RFI-CO-S-9412 00 KAIG3-RFI-CO-S-9412-00
KAIG3-RFI-CF-SU-3052 00 KAIG3-RFI-CF-SU-3052-00
KAIG3-RFI-CF-S-9410 00 KAIG3-RFI-CF-S-9410-00
KAIG3-RFI-CF-S-9409 00 KAIG3-RFI-CF-S-9409-00
KAIG3-RFI-CF-S-9408 00 KAIG3-RFI-CF-S-9408-00
KAIG3-RFI-CO-C-7869 00 KAIG3-RFI-CO-C-7869-00
KAIG3-RFI-EC-S-9411 00 KAIG3-RFI-EC-S-9411-00
KAIG3-RFI-CO-S-9416 00 KAIG3-RFI-CO-S-9416-00
KAIG3-RFI-EC-A-1075 00 KAIG3-RFI-EC-A-1075-00
KAIG3-RFI-EC-SU-3053 00 KAIG3-RFI-EC-SU-3053-00
KAIG3-RFI-EC-S-9415 00 KAIG3-RFI-EC-S-9415-00
KAIG3-RFI-CO-S-8331 02 KAIG3-RFI-CO-S-8331-02
KAIG3-RFI-CO-C-7868 00 KAIG3-RFI-CO-C-7868-00
KAIG3-RFI-CO-C-7867 00 KAIG3-RFI-CO-C-7867-00
KAIG3-RFI-RG-C-7866 00 KAIG3-RFI-RG-C-7866-00
KAIG3-RFI-CO-S-9406 00 KAIG3-RFI-CO-S-9406-00
KAIG3-RFI-CO-C-7865 00 KAIG3-RFI-CO-C-7865-00
KAIG3-RFI-CO-S-9405 00 KAIG3-RFI-CO-S-9405-00
KAIG3-RFI-CO-S-9404 00 KAIG3-RFI-CO-S-9404-00
KAIG3-RFI-MC-S-9387 00 KAIG3-RFI-MC-S-9387-00
KAIG3-RFI-LM-S-9400 00 KAIG3-RFI-LM-S-9400-00
KAIG3-RFI-CO-S-9402 00 KAIG3-RFI-CO-S-9402-00
KAIG3-RFI-MC-SU-3045 00 KAIG3-RFI-MC-SU-3045-00
KAIG3-RFI-CO-SU-3051 00 KAIG3-RFI-CO-SU-3051-00
KAIG3-RFI-SW-C-7888 00 KAIG3-RFI-SW-C-7888-00
KAIG3-RFI-CO-SU-3050 00 KAIG3-RFI-CO-SU-3050-00
KAIG3-RFI-CO-S-9398 00 KAIG3-RFI-CO-S-9398-00
KAIG3-RFI-SW-C-7887 00 KAIG3-RFI-SW-C-7887-00
KAIG3-RFI-CO-S-9397 00 KAIG3-RFI-CO-S-9397-00
KAIG3-RFI-CO-C-7860 00 KAIG3-RFI-CO-C-7860-00
KAIG3-RFI-CO-C-7861 00 KAIG3-RFI-CO-C-7861-00
KAIG3-RFI-CO-C-7862 00 KAIG3-RFI-CO-C-7862-00
KAIG3-RFI-RG-C-7863 00 KAIG3-RFI-RG-C-7863-00
KAIG3-RFI-PG-LS-1597 00 KAIG3-RFI-PG-LS-1597-00
KAIG3-RFI-WG-P-0316 00 KAIG3-RFI-WG-P-0316-00
KAIG3-RFI-SW-M-0315 00 KAIG3-RFI-SW-M-0315-00
KAIG3-RFI-RG-C-7886 00 KAIG3-RFI-RG-C-7886-00
KAIG3-RFI-RG-C-7859 00 KAIG3-RFI-RG-C-7859-00
KAIG3-RFI-CO-C-7858 00 KAIG3-RFI-CO-C-7858-00
KAIG3-RFI-CO-SU-3049 00 KAIG3-RFI-CO-SU-3049-00
KAIG3-RFI-CO-SU-3048 00 KAIG3-RFI-CO-SU-3048-00
KAIG3-RFI-CO-S-9395 00 KAIG3-RFI-CO-S-9395-00
KAIG3-RFI-EC-C-7857 00 KAIG3-RFI-EC-C-7857-00
KAIG3-RFI-CO-S-9255 00 KAIG3-RFI-CO-S-9255-00
KAIG3-RFI-PG-C-7312 00 KAIG3-RFI-PG-C-7312-00
KAIG3-RFI-LM-E-0568 00 KAIG3-RFI-LM-E-0568-00
KAIG3-RFI-TT-E-0560 00 KAIG3-RFI-TT-E-0560-00
KAIG3-RFI-PG-SU-3054 00 KAIG3-RFI-PG-SU-3054-00
KAIG3-RFI-MB-A-1072 00 KAIG3-RFI-MB-A-1072-00
KAIG3-RFI-WG-C-7872 00 KAIG3-RFI-WG-C-7872-00
KAIG3-RFI-WG-C-7871 00 KAIG3-RFI-WG-C-7871-00
KAIG3-RFI-WG-C-7870 00 KAIG3-RFI-WG-C-7870-00
KAIG3-RFI-PG-C-7864 00 KAIG3-RFI-PG-C-7864-00
KAIG3-RFI-PG-S-9417 00 KAIG3-RFI-PG-S-9417-00
KAIG3-RFI-TG-S-9407 00 KAIG3-RFI-TG-S-9407-00
KAIG3-RFI-TG-LS-1591 00 KAIG3-RFI-TG-LS-1591-00
KAIG3-RFI-DG-LS-1590 00 KAIG3-RFI-DG-LS-1590-00
KAIG3-RFI-DG-LS-1589 00 KAIG3-RFI-DG-LS-1589-00
KAIG3-RFI-DG-LS-1588 00 KAIG3-RFI-DG-LS-1588-00
KAIG3-RFI-SW-C-7881 00 KAIG3-RFI-SW-C-7881-00
KAIG3-RFI-SW-C-7880 00 KAIG3-RFI-SW-C-7880-00
KAIG3-RFI-SW-C-7879 00 KAIG3-RFI-SW-C-7879-00
KAIG3-RFI-SW-C-7878 00 KAIG3-RFI-SW-C-7878-00
KAIG3-RFI-SW-C-7877 00 KAIG3-RFI-SW-C-7877-00
KAIG3-RFI-SW-C-7876 00 KAIG3-RFI-SW-C-7876-00
KAIG3-RFI-SW-C-7855 00 KAIG3-RFI-SW-C-7855-00
KAIG3-RFI-SW-C-7854 00 KAIG3-RFI-SW-C-7854-00
KAIG3-RFI-SW-C-7853 00 KAIG3-RFI-SW-C-7853-00
KAIG3-RFI-SW-C-7852 00 KAIG3-RFI-SW-C-7852-00
KAIG3-RFI-SW-C-7851 00 KAIG3-RFI-SW-C-7851-00
KAIG3-RFI-SW-C-7849 00 KAIG3-RFI-SW-C-7849-00
KAIG3-RFI-SW-C-7848 00 KAIG3-RFI-SW-C-7848-00
KAIG3-RFI-SW-C-7847 00 KAIG3-RFI-SW-C-7847-00
KAIG3-RFI-SW-C-7846 00 KAIG3-RFI-SW-C-7846-00
KAIG3-RFI-SW-C-7845 00 KAIG3-RFI-SW-C-7845-00
KAIG3-RFI-TT-E-0559 00 KAIG3-RFI-TT-E-0559-00
KAIG3-RFI-PC-LC-0788 00 KAIG3-RFI-PC-LC-0788-00
KAIG3-RFI-PC-LC-0787 00 KAIG3-RFI-PC-LC-0787-00
KAIG3-RFI-SW-P-0314 00 KAIG3-RFI-SW-P-0314-00
KAIG3-RFI-SW-P-0313 00 KAIG3-RFI-SW-P-0313-00
KAIG3-RFI-SW-M-0309 00 KAIG3-RFI-SW-M-0309-00
KAIG3-RFI-CO-S-9393 00 KAIG3-RFI-CO-S-9393-00
KAIG3-RFI-EC-S-9394 00 KAIG3-RFI-EC-S-9394-00
KAIG3-RFI-EC-SU-3047 00 KAIG3-RFI-EC-SU-3047-00
KAIG3-RFI-EC-C-7856 00 KAIG3-RFI-EC-C-7856-00
KAIG3-RFI-CF-S-9384 00 KAIG3-RFI-CF-S-9384-00
KAIG3-RFI-CF-S-9385 00 KAIG3-RFI-CF-S-9385-00
KAIG3-RFI-CF-SU-3044 00 KAIG3-RFI-CF-SU-3044-00
KAIG3-RFI-CO-S-9388 00 KAIG3-RFI-CO-S-9388-00
KAIG3-RFI-MC-S-9386 00 KAIG3-RFI-MC-S-9386-00
KAIG3-RFI-MC-S-9389 00 KAIG3-RFI-MC-S-9389-00
KAIG3-RFI-MC-S-9390 00 KAIG3-RFI-MC-S-9390-00
KAIG3-RFI-MC-S-9391 00 KAIG3-RFI-MC-S-9391-00
KAIG3-RFI-SW-C-7835 00 KAIG3-RFI-SW-C-7835-00
KAIG3-RFI-SW-C-7834 00 KAIG3-RFI-SW-C-7834-00
KAIG3-RFI-SW-C-7833 00 KAIG3-RFI-SW-C-7833-00
KAIG3-RFI-SW-C-7832 00 KAIG3-RFI-SW-C-7832-00
KAIG3-RFI-SW-C-7831 00 KAIG3-RFI-SW-C-7831-00
KAIG3-RFI-SW-C-7830 00 KAIG3-RFI-SW-C-7830-00
KAIG3-RFI-CO-C-7839 00 KAIG3-RFI-CO-C-7839-00
KAIG3-RFI-RG-C-7840 00 KAIG3-RFI-RG-C-7840-00
KAIG3-RFI-LM-SU-3042 00 KAIG3-RFI-LM-SU-3042-00
KAIG3-RFI-LM-S-9379 00 KAIG3-RFI-LM-S-9379-00
KAIG3-RFI-CO-S-9367 00 KAIG3-RFI-CO-S-9367-00
KAIG3-RFI-CO-S-9368 00 KAIG3-RFI-CO-S-9368-00
KAIG3-RFI-VG-P-0312 00 KAIG3-RFI-VG-P-0312-00
KAIG3-RFI-CO-S-9373 00 KAIG3-RFI-CO-S-9373-00
KAIG3-RFI-VG-S-9381 00 KAIG3-RFI-VG-S-9381-00
KAIG3-RFI-VG-SU-3043 00 KAIG3-RFI-VG-SU-3043-00
KAIG3-RFI-CO-S-9374 00 KAIG3-RFI-CO-S-9374-00
KAIG3-RFI-CO-S-9375 00 KAIG3-RFI-CO-S-9375-00
KAIG3-RFI-CO-S-9376 00 KAIG3-RFI-CO-S-9376-00
KAIG3-RFI-LM-S-9377 00 KAIG3-RFI-LM-S-9377-00
KAIG3-RFI-LM-S-9378 00 KAIG3-RFI-LM-S-9378-00
KAIG3-RFI-CO-SU-3039 00 KAIG3-RFI-CO-SU-3039-00
KAIG3-RFI-PC-E-0595 00 KAIG3-RFI-PC-E-0595-00
KAIG3-RFI-PG-E-0594 00 KAIG3-RFI-PG-E-0594-00
KAIG3-RFI-PC-LC-0814 00 KAIG3-RFI-PC-LC-0814-00
KAIG3-RFI-PC-LC-0813 00 KAIG3-RFI-PC-LC-0813-00
KAIG3-RFI-TG-LC-0812 00 KAIG3-RFI-TG-LC-0812-00
KAIG3-RFI-TG-LC-0811 00 KAIG3-RFI-TG-LC-0811-00
KAIG3-RFI-TG-LC-0810 00 KAIG3-RFI-TG-LC-0810-00
KAIG3-RFI-TG-LS-1586 00 KAIG3-RFI-TG-LS-1586-00
KAIG3-RFI-TG-LS-1585 00 KAIG3-RFI-TG-LS-1585-00
KAIG3-RFI-WG-LS-1584 00 KAIG3-RFI-WG-LS-1584-00
KAIG3-RFI-WG-LS-1583 00 KAIG3-RFI-WG-LS-1583-00
KAIG3-RFI-PG-C-7843 00 KAIG3-RFI-PG-C-7843-00
KAIG3-RFI-PG-C-7842 00 KAIG3-RFI-PG-C-7842-00
KAIG3-RFI-WG-S-9392 00 KAIG3-RFI-WG-S-9392-00
KAIG3-RFI-TT-A-1071 00 KAIG3-RFI-TT-A-1071-00
KAIG3-RFI-WG-LS-1582 00 KAIG3-RFI-WG-LS-1582-00
KAIG3-RFI-PG-S-9372 00 KAIG3-RFI-PG-S-9372-00
KAIG3-RFI-WG-S-9371 00 KAIG3-RFI-WG-S-9371-00
KAIG3-RFI-PG-C-7841 00 KAIG3-RFI-PG-C-7841-00
KAIG3-RFI-WG-C-7838 00 KAIG3-RFI-WG-C-7838-00
KAIG3-RFI-TG-C-7837 00 KAIG3-RFI-TG-C-7837-00
KAIG3-RFI-PG-C-7836 00 KAIG3-RFI-PG-C-7836-00
KAIG3-RFI-PG-C-7821 00 KAIG3-RFI-PG-C-7821-00
KAIG3-RFI-WG-SU-3040 00 KAIG3-RFI-WG-SU-3040-00
KAIG3-RFI-WG-E-0593 00 KAIG3-RFI-WG-E-0593-00
KAIG3-RFI-MB-E-0592 00 KAIG3-RFI-MB-E-0592-00
KAIG3-RFI-WG-C-7772 00 KAIG3-RFI-WG-C-7772-00
KAIG3-RFI-PG-SU-3037 00 KAIG3-RFI-PG-SU-3037-00
KAIG3-RFI-WG-S-9273 01 KAIG3-RFI-WG-S-9273-01
KAIG3-RFI-TG-LS-1581 00 KAIG3-RFI-TG-LS-1581-00
KAIG3-RFI-TG-LS-1580 00 KAIG3-RFI-TG-LS-1580-00
KAIG3-RFI-WG-LS-1579 00 KAIG3-RFI-WG-LS-1579-00
KAIG3-RFI-WG-LS-1578 00 KAIG3-RFI-WG-LS-1578-00
KAIG3-RFI-WG-LS-1577 00 KAIG3-RFI-WG-LS-1577-00
KAIG3-RFI-PG-C-7809 00 KAIG3-RFI-PG-C-7809-00
KAIG3-RFI-WG-C-7808 00 KAIG3-RFI-WG-C-7808-00
KAIG3-RFI-WG-C-7807 00 KAIG3-RFI-WG-C-7807-00
KAIG3-RFI-PG-C-7806 00 KAIG3-RFI-PG-C-7806-00
KAIG3-RFI-SW-C-7829 00 KAIG3-RFI-SW-C-7829-00
KAIG3-RFI-SW-C-7828 00 KAIG3-RFI-SW-C-7828-00
KAIG3-RFI-SW-C-7827 00 KAIG3-RFI-SW-C-7827-00
KAIG3-RFI-TG-C-7801 00 KAIG3-RFI-TG-C-7801-00
KAIG3-RFI-SW-C-7826 00 KAIG3-RFI-SW-C-7826-00
KAIG3-RFI-SW-C-7825 00 KAIG3-RFI-SW-C-7825-00
KAIG3-RFI-SW-C-7824 00 KAIG3-RFI-SW-C-7824-00
KAIG3-RFI-SW-C-7823 00 KAIG3-RFI-SW-C-7823-00
KAIG3-RFI-SW-C-7822 00 KAIG3-RFI-SW-C-7822-00
KAIG3-RFI-MC-S-9345 00 KAIG3-RFI-MC-S-9345-00
KAIG3-RFI-SW-C-7820 00 KAIG3-RFI-SW-C-7820-00
KAIG3-RFI-SW-C-7819 00 KAIG3-RFI-SW-C-7819-00
KAIG3-RFI-SW-C-7818 00 KAIG3-RFI-SW-C-7818-00
KAIG3-RFI-SW-C-7817 00 KAIG3-RFI-SW-C-7817-00
KAIG3-RFI-SW-C-7320 01 KAIG3-RFI-SW-C-7320-01
KAIG3-RFI-SW-C-7318 01 KAIG3-RFI-SW-C-7318-01
KAIG3-RFI-CO-S-8801 00 KAIG3-RFI-CO-S-8801-00
KAIG3-RFI-SW-C-7816 00 KAIG3-RFI-SW-C-7816-00
KAIG3-RFI-SW-C-7815 00 KAIG3-RFI-SW-C-7815-00
KAIG3-RFI-SW-C-7814 00 KAIG3-RFI-SW-C-7814-00
KAIG3-RFI-SW-C-7813 00 KAIG3-RFI-SW-C-7813-00
KAIG3-RFI-SW-C-7812 00 KAIG3-RFI-SW-C-7812-00
KAIG3-RFI-SW-C-7811 00 KAIG3-RFI-SW-C-7811-00
KAIG3-RFI-SW-C-7810 00 KAIG3-RFI-SW-C-7810-00
KAIG3-RFI-SW-C-7800 00 KAIG3-RFI-SW-C-7800-00
KAIG3-RFI-SW-C-7797 00 KAIG3-RFI-SW-C-7797-00
KAIG3-RFI-SW-C-7796 00 KAIG3-RFI-SW-C-7796-00
KAIG3-RFI-SW-C-7795 00 KAIG3-RFI-SW-C-7795-00
KAIG3-RFI-SW-C-7794 00 KAIG3-RFI-SW-C-7794-00
KAIG3-RFI-SW-C-7793 00 KAIG3-RFI-SW-C-7793-00
KAIG3-RFI-SW-C-7792 00 KAIG3-RFI-SW-C-7792-00
KAIG3-RFI-SW-C-7791 00 KAIG3-RFI-SW-C-7791-00
KAIG3-RFI-SW-C-7790 00 KAIG3-RFI-SW-C-7790-00
KAIG3-RFI-SW-C-7133 01 KAIG3-RFI-SW-C-7133-01
KAIG3-RFI-SW-C-7130 01 KAIG3-RFI-SW-C-7130-01
KAIG3-RFI-PG-SU-3032 00 KAIG3-RFI-PG-SU-3032-00
KAIG3-RFI-WG-C-7788 00 KAIG3-RFI-WG-C-7788-00
KAIG3-RFI-WG-C-7787 00 KAIG3-RFI-WG-C-7787-00
KAIG3-RFI-PG-C-7786 00 KAIG3-RFI-PG-C-7786-00
KAIG3-RFI-PG-S-9346 00 KAIG3-RFI-PG-S-9346-00
KAIG3-RFI-WG-LS-1576 00 KAIG3-RFI-WG-LS-1576-00
KAIG3-RFI-WG-LS-1575 00 KAIG3-RFI-WG-LS-1575-00
KAIG3-RFI-ZG-LS-1574 00 KAIG3-RFI-ZG-LS-1574-00
KAIG3-RFI-ZG-LS-1573 00 KAIG3-RFI-ZG-LS-1573-00
KAIG3-RFI-ZG-LS-1571 00 KAIG3-RFI-ZG-LS-1571-00
KAIG3-RFI-ZG-LS-1570 00 KAIG3-RFI-ZG-LS-1570-00
KAIG3-RFI-CO-A-1069 00 KAIG3-RFI-CO-A-1069-00
KAIG3-RFI-CO-A-1068 00 KAIG3-RFI-CO-A-1068-00
KAIG3-RFI-CO-A-1067 00 KAIG3-RFI-CO-A-1067-00
KAIG3-RFI-VG-S-9359 00 KAIG3-RFI-VG-S-9359-00
KAIG3-RFI-VG-S-9360 00 KAIG3-RFI-VG-S-9360-00
KAIG3-RFI-VG-S-9361 00 KAIG3-RFI-VG-S-9361-00
KAIG3-RFI-CF-S-9362 00 KAIG3-RFI-CF-S-9362-00
KAIG3-RFI-CO-S-9357 00 KAIG3-RFI-CO-S-9357-00
KAIG3-RFI-CO-C-7802 00 KAIG3-RFI-CO-C-7802-00
KAIG3-RFI-RG-C-7803 00 KAIG3-RFI-RG-C-7803-00
KAIG3-RFI-CO-C-7805 00 KAIG3-RFI-CO-C-7805-00
KAIG3-RFI-CO-C-7804 00 KAIG3-RFI-CO-C-7804-00
KAIG3-RFI-EC-A-1070 00 KAIG3-RFI-EC-A-1070-00
KAIG3-RFI-EC-S-9363 00 KAIG3-RFI-EC-S-9363-00
KAIG3-RFI-EC-S-9364 00 KAIG3-RFI-EC-S-9364-00
KAIG3-RFI-EC-S-9365 00 KAIG3-RFI-EC-S-9365-00
KAIG3-RFI-EC-S-9366 00 KAIG3-RFI-EC-S-9366-00
KAIG3-RFI-MC-S-9313 00 KAIG3-RFI-MC-S-9313-00
KAIG3-RFI-CF-S-9354 00 KAIG3-RFI-CF-S-9354-00
KAIG3-RFI-CF-S-9355 00 KAIG3-RFI-CF-S-9355-00
KAIG3-RFI-CF-S-9356 00 KAIG3-RFI-CF-S-9356-00
KAIG3-RFI-CF-SU-3035 00 KAIG3-RFI-CF-SU-3035-00
KAIG3-RFI-CO-SU-3036 00 KAIG3-RFI-CO-SU-3036-00
KAIG3-RFI-LM-S-9331 00 KAIG3-RFI-LM-S-9331-00
KAIG3-RFI-CO-S-8159 00 KAIG3-RFI-CO-S-8159-00
KAIG3-RFI-CO-S-9358 00 KAIG3-RFI-CO-S-9358-00
KAIG3-RFI-CO-S-9027 00 KAIG3-RFI-CO-S-9027-00
KAIG3-RFI-MC-S-9344 00 KAIG3-RFI-MC-S-9344-00
KAIG3-RFI-MC-SU-3031 00 KAIG3-RFI-MC-SU-3031-00
KAIG3-RFI-SM-A-1065 00 KAIG3-RFI-SM-A-1065-00
KAIG3-RFI-CO-S-9347 00 KAIG3-RFI-CO-S-9347-00
KAIG3-RFI-CO-S-9348 00 KAIG3-RFI-CO-S-9348-00
KAIG3-RFI-CO-S-9349 00 KAIG3-RFI-CO-S-9349-00
KAIG3-RFI-CO-SU-3033 00 KAIG3-RFI-CO-SU-3033-00
KAIG3-RFI-CF-S-9350 00 KAIG3-RFI-CF-S-9350-00
KAIG3-RFI-EC-S-9351 00 KAIG3-RFI-EC-S-9351-00
KAIG3-RFI-EC-S-9352 00 KAIG3-RFI-EC-S-9352-00
KAIG3-RFI-EC-S-9353 00 KAIG3-RFI-EC-S-9353-00
KAIG3-RFI-CF-C-7773 00 KAIG3-RFI-CF-C-7773-00
KAIG3-RFI-EC-SU-3034 00 KAIG3-RFI-EC-SU-3034-00
KAIG3-RFI-CO-C-7784 00 KAIG3-RFI-CO-C-7784-00
KAIG3-RFI-CO-C-7785 00 KAIG3-RFI-CO-C-7785-00
KAIG3-RFI-CO-S-9341 00 KAIG3-RFI-CO-S-9341-00
KAIG3-RFI-CO-S-9342 00 KAIG3-RFI-CO-S-9342-00
KAIG3-RFI-CO-SU-3030 00 KAIG3-RFI-CO-SU-3030-00
KAIG3-RFI-CO-SU-3005 00 KAIG3-RFI-CO-SU-3005-00
KAIG3-RFI-CO-C-7746 00 KAIG3-RFI-CO-C-7746-00
KAIG3-RFI-CO-C-7742 00 KAIG3-RFI-CO-C-7742-00
KAIG3-RFI-CO-C-7705 00 KAIG3-RFI-CO-C-7705-00
KAIG3-RFI-EC-S-9335 00 KAIG3-RFI-EC-S-9335-00
KAIG3-RFI-CO-S-8977 00 KAIG3-RFI-CO-S-8977-00
KAIG3-RFI-CO-S-9340 00 KAIG3-RFI-CO-S-9340-00
KAIG3-RFI-SW-C-7789 00 KAIG3-RFI-SW-C-7789-00
KAIG3-RFI-SW-C-7770 00 KAIG3-RFI-SW-C-7770-00
KAIG3-RFI-SW-C-7769 00 KAIG3-RFI-SW-C-7769-00
KAIG3-RFI-SW-C-7768 00 KAIG3-RFI-SW-C-7768-00
KAIG3-RFI-SW-C-7767 00 KAIG3-RFI-SW-C-7767-00
KAIG3-RFI-SW-C-7260 01 KAIG3-RFI-SW-C-7260-01
KAIG3-RFI-RG-P-0308 00 KAIG3-RFI-RG-P-0308-00
KAIG3-RFI-SW-P-0307 00 KAIG3-RFI-SW-P-0307-00
KAIG3-RFI-WG-C-7775 00 KAIG3-RFI-WG-C-7775-00
KAIG3-RFI-WG-C-7774 00 KAIG3-RFI-WG-C-7774-00
KAIG3-RFI-PT-A-1059 00 KAIG3-RFI-PT-A-1059-00
KAIG3-RFI-WG-LS-1572 00 KAIG3-RFI-WG-LS-1572-00
KAIG3-RFI-WG-LS-1566 00 KAIG3-RFI-WG-LS-1566-00
KAIG3-RFI-WG-LS-1565 00 KAIG3-RFI-WG-LS-1565-00
KAIG3-RFI-WG-LS-1564 00 KAIG3-RFI-WG-LS-1564-00
KAIG3-RFI-WG-LS-1563 00 KAIG3-RFI-WG-LS-1563-00
KAIG3-RFI-CO-A-1064 00 KAIG3-RFI-CO-A-1064-00
KAIG3-RFI-CO-A-1063 00 KAIG3-RFI-CO-A-1063-00
KAIG3-RFI-CO-A-1062 00 KAIG3-RFI-CO-A-1062-00
KAIG3-RFI-CO-A-1061 00 KAIG3-RFI-CO-A-1061-00
KAIG3-RFI-CO-A-1005 00 KAIG3-RFI-CO-A-1005-00
KAIG3-RFI-CO-A-1000 01 KAIG3-RFI-CO-A-1000-01
KAIG3-RFI-SM-S-8646 00 KAIG3-RFI-SM-S-8646-00
KAIG3-RFI-SW-C-7766 00 KAIG3-RFI-SW-C-7766-00
KAIG3-RFI-SW-C-7765 00 KAIG3-RFI-SW-C-7765-00
KAIG3-RFI-SW-C-7763 00 KAIG3-RFI-SW-C-7763-00
KAIG3-RFI-SW-C-7762 00 KAIG3-RFI-SW-C-7762-00
KAIG3-RFI-SW-C-7761 00 KAIG3-RFI-SW-C-7761-00
KAIG3-RFI-SW-C-7760 00 KAIG3-RFI-SW-C-7760-00
KAIG3-RFI-SW-C-7759 00 KAIG3-RFI-SW-C-7759-00
KAIG3-RFI-SW-C-7758 00 KAIG3-RFI-SW-C-7758-00
KAIG3-RFI-SW-C-7620 00 KAIG3-RFI-SW-C-7620-00
KAIG3-RFI-SW-C-7443 01 KAIG3-RFI-SW-C-7443-01
KAIG3-RFI-RD-C-7290 01 KAIG3-RFI-RD-C-7290-01
KAIG3-RFI-SW-LS-1569 00 KAIG3-RFI-SW-LS-1569-00
KAIG3-RFI-SW-LS-1568 00 KAIG3-RFI-SW-LS-1568-00
KAIG3-RFI-SW-LS-1567 00 KAIG3-RFI-SW-LS-1567-00
KAIG3-RFI-LM-S-9333 00 KAIG3-RFI-LM-S-9333-00
KAIG3-RFI-LM-S-9334 00 KAIG3-RFI-LM-S-9334-00
KAIG3-RFI-SW-C-7783 00 KAIG3-RFI-SW-C-7783-00
KAIG3-RFI-LM-SU-3027 00 KAIG3-RFI-LM-SU-3027-00
KAIG3-RFI-CO-S-9338 00 KAIG3-RFI-CO-S-9338-00
KAIG3-RFI-SW-C-7782 00 KAIG3-RFI-SW-C-7782-00
KAIG3-RFI-CO-S-9337 00 KAIG3-RFI-CO-S-9337-00
KAIG3-RFI-SW-M-0291 01 KAIG3-RFI-SW-M-0291-01
KAIG3-RFI-SW-M-0290 01 KAIG3-RFI-SW-M-0290-01
KAIG3-RFI-CO-S-9339 00 KAIG3-RFI-CO-S-9339-00
KAIG3-RFI-CO-SU-3029 00 KAIG3-RFI-CO-SU-3029-00
KAIG3-RFI-CO-A-1060 00 KAIG3-RFI-CO-A-1060-00
KAIG3-RFI-RG-C-7777 00 KAIG3-RFI-RG-C-7777-00
KAIG3-RFI-CO-C-7778 00 KAIG3-RFI-CO-C-7778-00
KAIG3-RFI-CO-C-7780 00 KAIG3-RFI-CO-C-7780-00
KAIG3-RFI-EC-C-7781 00 KAIG3-RFI-EC-C-7781-00
KAIG3-RFI-EC-SU-3028 00 KAIG3-RFI-EC-SU-3028-00
KAIG3-RFI-EC-S-9336 00 KAIG3-RFI-EC-S-9336-00
KAIG3-RFI-NA-C-7546 01 KAIG3-RFI-NA-C-7546-01
KAIG3-RFI-CO-S-9327 00 KAIG3-RFI-CO-S-9327-00
KAIG3-RFI-CO-S-9328 00 KAIG3-RFI-CO-S-9328-00
KAIG3-RFI-MC-S-9329 00 KAIG3-RFI-MC-S-9329-00
KAIG3-RFI-LM-S-9330 00 KAIG3-RFI-LM-S-9330-00
KAIG3-RFI-LM-SU-3026 00 KAIG3-RFI-LM-SU-3026-00
KAIG3-RFI-LM-S-9332 00 KAIG3-RFI-LM-S-9332-00
KAIG3-RFI-CO-A-1057 00 KAIG3-RFI-CO-A-1057-00
KAIG3-RFI-CO-SU-3017 00 KAIG3-RFI-CO-SU-3017-00
KAIG3-RFI-CO-A-1018 00 KAIG3-RFI-CO-A-1018-00
KAIG3-RFI-CO-SU-3025 00 KAIG3-RFI-CO-SU-3025-00
KAIG3-RFI-CO-S-9325 00 KAIG3-RFI-CO-S-9325-00
KAIG3-RFI-CO-S-9324 00 KAIG3-RFI-CO-S-9324-00
KAIG3-RFI-MC-S-9323 00 KAIG3-RFI-MC-S-9323-00
KAIG3-RFI-CO-S-9309 00 KAIG3-RFI-CO-S-9309-00
KAIG3-RFI-CO-A-1058 00 KAIG3-RFI-CO-A-1058-00
KAIG3-RFI-CO-S-9308 00 KAIG3-RFI-CO-S-9308-00
KAIG3-RFI-CO-S-9310 00 KAIG3-RFI-CO-S-9310-00
KAIG3-RFI-CO-S-9326 00 KAIG3-RFI-CO-S-9326-00
KAIG3-RFI-CO-S-8582 01 KAIG3-RFI-CO-S-8582-01
KAIG3-RFI-CO-S-9228 01 KAIG3-RFI-CO-S-9228-01
KAIG3-RFI-PG-C-7751 00 KAIG3-RFI-PG-C-7751-00
KAIG3-RFI-PG-C-7750 00 KAIG3-RFI-PG-C-7750-00
KAIG3-RFI-WG-A-1056 00 KAIG3-RFI-WG-A-1056-00
KAIG3-RFI-WG-A-1055 00 KAIG3-RFI-WG-A-1055-00
KAIG3-RFI-TB-SS-0419 01 KAIG3-RFI-TB-SS-0419-01
KAIG3-RFI-ZG-LS-1562 00 KAIG3-RFI-ZG-LS-1562-00
KAIG3-RFI-ZG-LS-1561 00 KAIG3-RFI-ZG-LS-1561-00
KAIG3-RFI-AG-LS-1560 00 KAIG3-RFI-AG-LS-1560-00
KAIG3-RFI-AG-LS-1559 00 KAIG3-RFI-AG-LS-1559-00
KAIG3-RFI-WG-S-9317 00 KAIG3-RFI-WG-S-9317-00
KAIG3-RFI-CO-C-7743 00 KAIG3-RFI-CO-C-7743-00
KAIG3-RFI-CO-SS-0430 00 KAIG3-RFI-CO-SS-0430-00
KAIG3-RFI-MC-S-9131 00 KAIG3-RFI-MC-S-9131-00
KAIG3-RFI-CO-SU-3010 00 KAIG3-RFI-CO-SU-3010-00
KAIG3-RFI-CO-SU-3024 00 KAIG3-RFI-CO-SU-3024-00
KAIG3-RFI-CO-S-9249 00 KAIG3-RFI-CO-S-9249-00
KAIG3-RFI-CO-S-9314 00 KAIG3-RFI-CO-S-9314-00
KAIG3-RFI-MC-C-7749 00 KAIG3-RFI-MC-C-7749-00
KAIG3-RFI-CO-C-7748 00 KAIG3-RFI-CO-C-7748-00
KAIG3-RFI-RG-C-7747 00 KAIG3-RFI-RG-C-7747-00
KAIG3-RFI-MC-SU-3023 00 KAIG3-RFI-MC-SU-3023-00
KAIG3-RFI-MC-S-9312 00 KAIG3-RFI-MC-S-9312-00
KAIG3-RFI-MC-S-9311 00 KAIG3-RFI-MC-S-9311-00
KAIG3-RFI-CO-S-9316 00 KAIG3-RFI-CO-S-9316-00
KAIG3-RFI-CO-S-9315 00 KAIG3-RFI-CO-S-9315-00
KAIG3-RFI-CO-S-9318 00 KAIG3-RFI-CO-S-9318-00
KAIG3-RFI-CO-S-9319 00 KAIG3-RFI-CO-S-9319-00
KAIG3-RFI-CO-S-9277 00 KAIG3-RFI-CO-S-9277-00
KAIG3-RFI-VG-S-9304 00 KAIG3-RFI-VG-S-9304-00
KAIG3-RFI-CO-S-9025 00 KAIG3-RFI-CO-S-9025-00
KAIG3-RFI-SW-C-7756 00 KAIG3-RFI-SW-C-7756-00
KAIG3-RFI-SW-C-7755 00 KAIG3-RFI-SW-C-7755-00
KAIG3-RFI-SW-C-7754 00 KAIG3-RFI-SW-C-7754-00
KAIG3-RFI-SW-C-7753 00 KAIG3-RFI-SW-C-7753-00
KAIG3-RFI-SW-C-7752 00 KAIG3-RFI-SW-C-7752-00
KAIG3-RFI-SW-C-7740 00 KAIG3-RFI-SW-C-7740-00
KAIG3-RFI-SW-C-7737 00 KAIG3-RFI-SW-C-7737-00
KAIG3-RFI-SW-C-7736 00 KAIG3-RFI-SW-C-7736-00
KAIG3-RFI-SW-C-7735 00 KAIG3-RFI-SW-C-7735-00
KAIG3-RFI-SW-C-7734 00 KAIG3-RFI-SW-C-7734-00
KAIG3-RFI-SW-C-7733 00 KAIG3-RFI-SW-C-7733-00
KAIG3-RFI-SW-C-7732 00 KAIG3-RFI-SW-C-7732-00
KAIG3-RFI-CO-S-9301 00 KAIG3-RFI-CO-S-9301-00
KAIG3-RFI-CO-S-9302 00 KAIG3-RFI-CO-S-9302-00
KAIG3-RFI-CO-S-9303 00 KAIG3-RFI-CO-S-9303-00
KAIG3-RFI-CO-SU-3022 00 KAIG3-RFI-CO-SU-3022-00
KAIG3-RFI-PC-S-9299 00 KAIG3-RFI-PC-S-9299-00
KAIG3-RFI-PC-S-9300 00 KAIG3-RFI-PC-S-9300-00
KAIG3-RFI-CO-C-7744 00 KAIG3-RFI-CO-C-7744-00
KAIG3-RFI-EC-S-9293 00 KAIG3-RFI-EC-S-9293-00
KAIG3-RFI-EC-S-9294 00 KAIG3-RFI-EC-S-9294-00
KAIG3-RFI-EC-S-9296 00 KAIG3-RFI-EC-S-9296-00
KAIG3-RFI-CO-S-9298 00 KAIG3-RFI-CO-S-9298-00
KAIG3-RFI-CO-SU-3021 00 KAIG3-RFI-CO-SU-3021-00
KAIG3-RFI-LM-S-9178 01 KAIG3-RFI-LM-S-9178-01
KAIG3-RFI-CO-S-9083 01 KAIG3-RFI-CO-S-9083-01
KAIG3-RFI-LM-S-9180 01 KAIG3-RFI-LM-S-9180-01
KAIG3-RFI-CO-S-9173 01 KAIG3-RFI-CO-S-9173-01
KAIG3-RFI-CO-S-9172 01 KAIG3-RFI-CO-S-9172-01
KAIG3-RFI-CO-S-9171 01 KAIG3-RFI-CO-S-9171-01
KAIG3-RFI-VG-S-8924 01 KAIG3-RFI-VG-S-8924-01
KAIG3-RFI-CO-S-9026 01 KAIG3-RFI-CO-S-9026-01
KAIG3-RFI-VG-S-8925 01 KAIG3-RFI-VG-S-8925-01
KAIG3-RFI-LM-SU-2945 01 KAIG3-RFI-LM-SU-2945-01
KAIG3-RFI-CO-S-9262 00 KAIG3-RFI-CO-S-9262-00
KAIG3-RFI-CO-C-7710 00 KAIG3-RFI-CO-C-7710-00
KAIG3-RFI-CO-S-8723 00 KAIG3-RFI-CO-S-8723-00
KAIG3-RFI-CO-S-9289 00 KAIG3-RFI-CO-S-9289-00
KAIG3-RFI-CO-SS-0437 00 KAIG3-RFI-CO-SS-0437-00
KAIG3-RFI-CO-S-9281 00 KAIG3-RFI-CO-S-9281-00
KAIG3-RFI-CO-S-9282 00 KAIG3-RFI-CO-S-9282-00
KAIG3-RFI-CO-SU-3014 00 KAIG3-RFI-CO-SU-3014-00
KAIG3-RFI-CO-SS-0442 00 KAIG3-RFI-CO-SS-0442-00
KAIG3-RFI-CO-S-7973 01 KAIG3-RFI-CO-S-7973-01
KAIG3-RFI-MC-S-9290 00 KAIG3-RFI-MC-S-9290-00
KAIG3-RFI-CO-SU-3018 00 KAIG3-RFI-CO-SU-3018-00
KAIG3-RFI-RG-C-7708 00 KAIG3-RFI-RG-C-7708-00
KAIG3-RFI-CO-S-7972 02 KAIG3-RFI-CO-S-7972-02
KAIG3-RFI-CO-A-1050 00 KAIG3-RFI-CO-A-1050-00
KAIG3-RFI-CO-S-9285 00 KAIG3-RFI-CO-S-9285-00
KAIG3-RFI-CO-S-9286 00 KAIG3-RFI-CO-S-9286-00
KAIG3-RFI-CO-S-9287 00 KAIG3-RFI-CO-S-9287-00
KAIG3-RFI-CO-S-9288 00 KAIG3-RFI-CO-S-9288-00
KAIG3-RFI-MC-C-7709 00 KAIG3-RFI-MC-C-7709-00
KAIG3-RFI-CO-A-1048 00 KAIG3-RFI-CO-A-1048-00
KAIG3-RFI-WG-C-7745 00 KAIG3-RFI-WG-C-7745-00
KAIG3-RFI-CO-C-7707 00 KAIG3-RFI-CO-C-7707-00
KAIG3-RFI-WG-C-7730 00 KAIG3-RFI-WG-C-7730-00
KAIG3-RFI-EC-S-9283 00 KAIG3-RFI-EC-S-9283-00
KAIG3-RFI-WG-C-7729 00 KAIG3-RFI-WG-C-7729-00
KAIG3-RFI-WG-C-7728 00 KAIG3-RFI-WG-C-7728-00
KAIG3-RFI-EC-S-9284-00 00 KAIG3-RFI-EC-S-9284-00-00
KAIG3-RFI-WG-C-7727 00 KAIG3-RFI-WG-C-7727-00
KAIG3-RFI-PG-C-7726 00 KAIG3-RFI-PG-C-7726-00
KAIG3-RFI-WG-SU-3020 00 KAIG3-RFI-WG-SU-3020-00
KAIG3-RFI-MC-S-9280 00 KAIG3-RFI-MC-S-9280-00
KAIG3-RFI-TB-SU-3019 00 KAIG3-RFI-TB-SU-3019-00
KAIG3-RFI-MC-S-9279 00 KAIG3-RFI-MC-S-9279-00
KAIG3-RFI-MC-S-9278 00 KAIG3-RFI-MC-S-9278-00
KAIG3-RFI-CO-C-7638 00 KAIG3-RFI-CO-C-7638-00
KAIG3-RFI-TT-A-1054 00 KAIG3-RFI-TT-A-1054-00
KAIG3-RFI-WG-A-1053 00 KAIG3-RFI-WG-A-1053-00
KAIG3-RFI-WG-A-1052 00 KAIG3-RFI-WG-A-1052-00
KAIG3-RFI-PT-A-1051 00 KAIG3-RFI-PT-A-1051-00
KAIG3-RFI-MC-S-9271 00 KAIG3-RFI-MC-S-9271-00
KAIG3-RFI-CO-A-1034 01 KAIG3-RFI-CO-A-1034-01
KAIG3-RFI-TB-S-9292 00 KAIG3-RFI-TB-S-9292-00
KAIG3-RFI-CO-S-9177 00 KAIG3-RFI-CO-S-9177-00
KAIG3-RFI-WG-S-9291 00 KAIG3-RFI-WG-S-9291-00
KAIG3-RFI-SW-C-7731 00 KAIG3-RFI-SW-C-7731-00
KAIG3-RFI-SW-C-7725 00 KAIG3-RFI-SW-C-7725-00
KAIG3-RFI-SW-C-7724 00 KAIG3-RFI-SW-C-7724-00
KAIG3-RFI-SW-C-7723 00 KAIG3-RFI-SW-C-7723-00
KAIG3-RFI-SW-C-7722 00 KAIG3-RFI-SW-C-7722-00
KAIG3-RFI-SW-C-7721 00 KAIG3-RFI-SW-C-7721-00
KAIG3-RFI-SW-C-7720 00 KAIG3-RFI-SW-C-7720-00
KAIG3-RFI-SW-C-7719 00 KAIG3-RFI-SW-C-7719-00
KAIG3-RFI-SW-C-7718 00 KAIG3-RFI-SW-C-7718-00
KAIG3-RFI-SW-C-7717 00 KAIG3-RFI-SW-C-7717-00
KAIG3-RFI-SW-C-7716 00 KAIG3-RFI-SW-C-7716-00
KAIG3-RFI-SW-C-7715 00 KAIG3-RFI-SW-C-7715-00
KAIG3-RFI-SW-C-7714 00 KAIG3-RFI-SW-C-7714-00
KAIG3-RFI-SW-C-7713 00 KAIG3-RFI-SW-C-7713-00
KAIG3-RFI-SW-C-7420 01 KAIG3-RFI-SW-C-7420-01
KAIG3-RFI-AG-SU-3016 00 KAIG3-RFI-AG-SU-3016-00
KAIG3-RFI-AG-SU-3015 00 KAIG3-RFI-AG-SU-3015-00
KAIG3-RFI-AG-LS-1558 00 KAIG3-RFI-AG-LS-1558-00
KAIG3-RFI-AG-LS-1557 00 KAIG3-RFI-AG-LS-1557-00
KAIG3-RFI-WG-A-1047 00 KAIG3-RFI-WG-A-1047-00
KAIG3-RFI-MB-A-1046 00 KAIG3-RFI-MB-A-1046-00
KAIG3-RFI-WG-A-1045 00 KAIG3-RFI-WG-A-1045-00
KAIG3-RFI-WG-C-7712 00 KAIG3-RFI-WG-C-7712-00
KAIG3-RFI-WG-C-7711 00 KAIG3-RFI-WG-C-7711-00
KAIG3-RFI-PG-C-7704 00 KAIG3-RFI-PG-C-7704-00
KAIG3-RFI-WG-C-7703 00 KAIG3-RFI-WG-C-7703-00
KAIG3-RFI-WG-C-7702 00 KAIG3-RFI-WG-C-7702-00
KAIG3-RFI-SW-C-7677 00 KAIG3-RFI-SW-C-7677-00
KAIG3-RFI-SW-P-0306 00 KAIG3-RFI-SW-P-0306-00
KAIG3-RFI-SW-P-0305 00 KAIG3-RFI-SW-P-0305-00
KAIG3-RFI-CO-C-7530 00 KAIG3-RFI-CO-C-7530-00
KAIG3-RFI-SW-C-6870 00 KAIG3-RFI-SW-C-6870-00
KAIG3-RFI-CF-S-7861 02 KAIG3-RFI-CF-S-7861-02
KAIG3-RFI-VG-C-6226 01 KAIG3-RFI-VG-C-6226-01
KAIG3-RFI-LM-S-9266 00 KAIG3-RFI-LM-S-9266-00
KAIG3-RFI-CO-SU-3008 00 KAIG3-RFI-CO-SU-3008-00
KAIG3-RFI-CO-S-9267 00 KAIG3-RFI-CO-S-9267-00
KAIG3-RFI-SW-C-7460 00 KAIG3-RFI-SW-C-7460-00
KAIG3-RFI-CO-S-9264 00 KAIG3-RFI-CO-S-9264-00
KAIG3-RFI-CO-S-9261 00 KAIG3-RFI-CO-S-9261-00
KAIG3-RFI-MC-S-9269 00 KAIG3-RFI-MC-S-9269-00
KAIG3-RFI-CO-S-9260 00 KAIG3-RFI-CO-S-9260-00
KAIG3-RFI-CO-SU-3009 00 KAIG3-RFI-CO-SU-3009-00
KAIG3-RFI-CO-S-9265 00 KAIG3-RFI-CO-S-9265-00
KAIG3-RFI-CO-S-9263 00 KAIG3-RFI-CO-S-9263-00
KAIG3-RFI-LM-S-9042 01 KAIG3-RFI-LM-S-9042-01
KAIG3-RFI-MC-SU-3011 00 KAIG3-RFI-MC-SU-3011-00
KAIG3-RFI-CO-SU-2932 01 KAIG3-RFI-CO-SU-2932-01
KAIG3-RFI-CO-SU-2906 01 KAIG3-RFI-CO-SU-2906-01
KAIG3-RFI-MC-S-9270 00 KAIG3-RFI-MC-S-9270-00
KAIG3-RFI-WG-C-7684 00 KAIG3-RFI-WG-C-7684-00
KAIG3-RFI-CO-S-9268 00 KAIG3-RFI-CO-S-9268-00
KAIG3-RFI-WG-C-7683 00 KAIG3-RFI-WG-C-7683-00
KAIG3-RFI-WG-C-7682 00 KAIG3-RFI-WG-C-7682-00
KAIG3-RFI-CO-A-1043 00 KAIG3-RFI-CO-A-1043-00
KAIG3-RFI-WG-C-7681 00 KAIG3-RFI-WG-C-7681-00
KAIG3-RFI-PG-C-7680 00 KAIG3-RFI-PG-C-7680-00
KAIG3-RFI-VG-S-8926 01 KAIG3-RFI-VG-S-8926-01
KAIG3-RFI-CO-S-8951 01 KAIG3-RFI-CO-S-8951-01
KAIG3-RFI-SW-C-7700 00 KAIG3-RFI-SW-C-7700-00
KAIG3-RFI-SW-C-7699 00 KAIG3-RFI-SW-C-7699-00
KAIG3-RFI-SW-C-7698 00 KAIG3-RFI-SW-C-7698-00
KAIG3-RFI-SW-C-7697 00 KAIG3-RFI-SW-C-7697-00
KAIG3-RFI-CF-S-8731 00 KAIG3-RFI-CF-S-8731-00
KAIG3-RFI-SW-C-7696 00 KAIG3-RFI-SW-C-7696-00
KAIG3-RFI-CO-S-8756 01 KAIG3-RFI-CO-S-8756-01
KAIG3-RFI-SW-C-7695 00 KAIG3-RFI-SW-C-7695-00
KAIG3-RFI-SW-C-7694 00 KAIG3-RFI-SW-C-7694-00
KAIG3-RFI-SW-C-7693 00 KAIG3-RFI-SW-C-7693-00
KAIG3-RFI-SW-C-7692 00 KAIG3-RFI-SW-C-7692-00
KAIG3-RFI-SW-C-7691 00 KAIG3-RFI-SW-C-7691-00
KAIG3-RFI-SW-C-7690 00 KAIG3-RFI-SW-C-7690-00
KAIG3-RFI-SW-C-7689 00 KAIG3-RFI-SW-C-7689-00
KAIG3-RFI-SW-C-7688 00 KAIG3-RFI-SW-C-7688-00
KAIG3-RFI-PC-E-0577 01 KAIG3-RFI-PC-E-0577-01
KAIG3-RFI-PG-C-7679 00 KAIG3-RFI-PG-C-7679-00
KAIG3-RFI-SW-C-7687 00 KAIG3-RFI-SW-C-7687-00
KAIG3-RFI-SW-C-7686 00 KAIG3-RFI-SW-C-7686-00
KAIG3-RFI-WG-C-7678 00 KAIG3-RFI-WG-C-7678-00
KAIG3-RFI-SW-C-6982 01 KAIG3-RFI-SW-C-6982-01
KAIG3-RFI-SW-E-0558 00 KAIG3-RFI-SW-E-0558-00
KAIG3-RFI-PC-LC-0807 00 KAIG3-RFI-PC-LC-0807-00
KAIG3-RFI-PC-LC-0806 00 KAIG3-RFI-PC-LC-0806-00
KAIG3-RFI-CF-S-8730 00 KAIG3-RFI-CF-S-8730-00
KAIG3-RFI-CF-S-8729 00 KAIG3-RFI-CF-S-8729-00
KAIG3-RFI-WG-C-7676 00 KAIG3-RFI-WG-C-7676-00
KAIG3-RFI-WG-C-7388 01 KAIG3-RFI-WG-C-7388-01
KAIG3-RFI-AG-LS-1556 00 KAIG3-RFI-AG-LS-1556-00
KAIG3-RFI-AG-LS-1555 00 KAIG3-RFI-AG-LS-1555-00
KAIG3-RFI-EC-S-8667 01 KAIG3-RFI-EC-S-8667-01
KAIG3-RFI-WG-S-9273 00 KAIG3-RFI-WG-S-9273-00
KAIG3-RFI-WG-S-9272 00 KAIG3-RFI-WG-S-9272-00
KAIG3-RFI-LM-LC-0803 00 KAIG3-RFI-LM-LC-0803-00
KAIG3-RFI-CC-M-0304 00 KAIG3-RFI-CC-M-0304-00
KAIG3-RFI-CO-C-6817 00 KAIG3-RFI-CO-C-6817-00
KAIG3-RFI-MC-S-9168 00 KAIG3-RFI-MC-S-9168-00
KAIG3-RFI-CO-SS-0441 00 KAIG3-RFI-CO-SS-0441-00
KAIG3-RFI-CO-SU-3012 00 KAIG3-RFI-CO-SU-3012-00
KAIG3-RFI-CO-S-9276 00 KAIG3-RFI-CO-S-9276-00
KAIG3-RFI-CO-S-9275 00 KAIG3-RFI-CO-S-9275-00
KAIG3-RFI-CO-S-8865 01 KAIG3-RFI-CO-S-8865-01
KAIG3-RFI-SW-C-7685 00 KAIG3-RFI-SW-C-7685-00
KAIG3-RFI-SW-C-7675 00 KAIG3-RFI-SW-C-7675-00
KAIG3-RFI-SW-C-7674 00 KAIG3-RFI-SW-C-7674-00
KAIG3-RFI-SW-C-7673 00 KAIG3-RFI-SW-C-7673-00
KAIG3-RFI-SW-C-7672 00 KAIG3-RFI-SW-C-7672-00
KAIG3-RFI-SW-C-7671 00 KAIG3-RFI-SW-C-7671-00
KAIG3-RFI-SW-C-7670 00 KAIG3-RFI-SW-C-7670-00
KAIG3-RFI-SW-C-7669 00 KAIG3-RFI-SW-C-7669-00
KAIG3-RFI-SW-C-7668 00 KAIG3-RFI-SW-C-7668-00
KAIG3-RFI-SW-C-7667 00 KAIG3-RFI-SW-C-7667-00
KAIG3-RFI-SW-C-7666 00 KAIG3-RFI-SW-C-7666-00
KAIG3-RFI-SW-C-7665 00 KAIG3-RFI-SW-C-7665-00
KAIG3-RFI-SW-C-7664 00 KAIG3-RFI-SW-C-7664-00
KAIG3-RFI-SW-C-7663 00 KAIG3-RFI-SW-C-7663-00
KAIG3-RFI-SW-C-7662 00 KAIG3-RFI-SW-C-7662-00
KAIG3-RFI-SW-C-7661 00 KAIG3-RFI-SW-C-7661-00
KAIG3-RFI-SW-C-7660 00 KAIG3-RFI-SW-C-7660-00
KAIG3-RFI-SW-C-7659 00 KAIG3-RFI-SW-C-7659-00
KAIG3-RFI-SW-C-7658 00 KAIG3-RFI-SW-C-7658-00
KAIG3-RFI-SW-C-7633 00 KAIG3-RFI-SW-C-7633-00
KAIG3-RFI-SW-C-7441 01 KAIG3-RFI-SW-C-7441-01
KAIG3-RFI-CO-S-9256 00 KAIG3-RFI-CO-S-9256-00
KAIG3-RFI-CO-S-9254 00 KAIG3-RFI-CO-S-9254-00
KAIG3-RFI-MC-C-7640 00 KAIG3-RFI-MC-C-7640-00
KAIG3-RFI-CO-C-7642 00 KAIG3-RFI-CO-C-7642-00
KAIG3-RFI-MC-S-9252 00 KAIG3-RFI-MC-S-9252-00
KAIG3-RFI-CO-C-7641 00 KAIG3-RFI-CO-C-7641-00
KAIG3-RFI-MC-S-9257 00 KAIG3-RFI-MC-S-9257-00
KAIG3-RFI-MC-SU-3006 00 KAIG3-RFI-MC-SU-3006-00
KAIG3-RFI-CO-S-9248 00 KAIG3-RFI-CO-S-9248-00
KAIG3-RFI-CO-A-1041 00 KAIG3-RFI-CO-A-1041-00
KAIG3-RFI-CO-S-9247 00 KAIG3-RFI-CO-S-9247-00
KAIG3-RFI-CO-S-9246 00 KAIG3-RFI-CO-S-9246-00
KAIG3-RFI-CO-S-9245 00 KAIG3-RFI-CO-S-9245-00
KAIG3-RFI-CO-S-9244 00 KAIG3-RFI-CO-S-9244-00
KAIG3-RFI-RG-C-7639 00 KAIG3-RFI-RG-C-7639-00
KAIG3-RFI-CO-S-9239 00 KAIG3-RFI-CO-S-9239-00
KAIG3-RFI-RG-C-7617 00 KAIG3-RFI-RG-C-7617-00
KAIG3-RFI-CO-S-9197 00 KAIG3-RFI-CO-S-9197-00
KAIG3-RFI-CO-S-8508 00 KAIG3-RFI-CO-S-8508-00
KAIG3-RFI-CO-S-8544 00 KAIG3-RFI-CO-S-8544-00
KAIG3-RFI-CO-A-1036 00 KAIG3-RFI-CO-A-1036-00
KAIG3-RFI-CO-A-1035 00 KAIG3-RFI-CO-A-1035-00
KAIG3-RFI-MC-S-9258 00 KAIG3-RFI-MC-S-9258-00
KAIG3-RFI-MB-A-1042 00 KAIG3-RFI-MB-A-1042-00
KAIG3-RFI-WG-LS-1554 00 KAIG3-RFI-WG-LS-1554-00
KAIG3-RFI-WG-LS-1553 00 KAIG3-RFI-WG-LS-1553-00
KAIG3-RFI-WG-C-7644 00 KAIG3-RFI-WG-C-7644-00
KAIG3-RFI-WG-C-7643 00 KAIG3-RFI-WG-C-7643-00
KAIG3-RFI-SW-C-7637 00 KAIG3-RFI-SW-C-7637-00
KAIG3-RFI-WG-C-7636 00 KAIG3-RFI-WG-C-7636-00
KAIG3-RFI-TB-SU-3007 00 KAIG3-RFI-TB-SU-3007-00
KAIG3-RFI-WG-SU-3004 00 KAIG3-RFI-WG-SU-3004-00
KAIG3-RFI-TB-S-9259 00 KAIG3-RFI-TB-S-9259-00
KAIG3-RFI-WG-S-9251 00 KAIG3-RFI-WG-S-9251-00
KAIG3-RFI-WG-S-9250 00 KAIG3-RFI-WG-S-9250-00
KAIG3-RFI-TT-LC-0802 00 KAIG3-RFI-TT-LC-0802-00
KAIG3-RFI-TB-LC-0801 00 KAIG3-RFI-TB-LC-0801-00
KAIG3-RFI-TB-E-0556 00 KAIG3-RFI-TB-E-0556-00
KAIG3-RFI-SW-E-0589 00 KAIG3-RFI-SW-E-0589-00
KAIG3-RFI-SW-E-0588 00 KAIG3-RFI-SW-E-0588-00
KAIG3-RFI-SW-E-0587 00 KAIG3-RFI-SW-E-0587-00
KAIG3-RFI-SW-E-0586 00 KAIG3-RFI-SW-E-0586-00
KAIG3-RFI-SW-C-7646 00 KAIG3-RFI-SW-C-7646-00
KAIG3-RFI-SW-C-7645 00 KAIG3-RFI-SW-C-7645-00
KAIG3-RFI-SW-C-7657 00 KAIG3-RFI-SW-C-7657-00
KAIG3-RFI-SW-C-7656 00 KAIG3-RFI-SW-C-7656-00
KAIG3-RFI-SW-C-7655 00 KAIG3-RFI-SW-C-7655-00
KAIG3-RFI-SW-C-7654 00 KAIG3-RFI-SW-C-7654-00
KAIG3-RFI-SW-C-7653 00 KAIG3-RFI-SW-C-7653-00
KAIG3-RFI-SW-C-7652 00 KAIG3-RFI-SW-C-7652-00
KAIG3-RFI-SW-C-7651 00 KAIG3-RFI-SW-C-7651-00
KAIG3-RFI-SW-C-7650 00 KAIG3-RFI-SW-C-7650-00
KAIG3-RFI-SW-C-7649 00 KAIG3-RFI-SW-C-7649-00
KAIG3-RFI-SW-C-7648 00 KAIG3-RFI-SW-C-7648-00
KAIG3-RFI-SW-C-7647 00 KAIG3-RFI-SW-C-7647-00
KAIG3-RFI-SW-C-7635 00 KAIG3-RFI-SW-C-7635-00
KAIG3-RFI-SW-C-7634 00 KAIG3-RFI-SW-C-7634-00
KAIG3-RFI-SW-C-7632 00 KAIG3-RFI-SW-C-7632-00
KAIG3-RFI-SW-C-7631 00 KAIG3-RFI-SW-C-7631-00
KAIG3-RFI-SW-C-7630 00 KAIG3-RFI-SW-C-7630-00
KAIG3-RFI-SW-C-7629 00 KAIG3-RFI-SW-C-7629-00
KAIG3-RFI-SW-C-7628 00 KAIG3-RFI-SW-C-7628-00
KAIG3-RFI-SW-C-7627 00 KAIG3-RFI-SW-C-7627-00
KAIG3-RFI-SW-C-7626 00 KAIG3-RFI-SW-C-7626-00
KAIG3-RFI-SW-C-7625 00 KAIG3-RFI-SW-C-7625-00
KAIG3-RFI-SW-C-7624 00 KAIG3-RFI-SW-C-7624-00
KAIG3-RFI-SW-C-7623 00 KAIG3-RFI-SW-C-7623-00
KAIG3-RFI-SW-C-7622 00 KAIG3-RFI-SW-C-7622-00
KAIG3-RFI-SW-C-7621 00 KAIG3-RFI-SW-C-7621-00
KAIG3-RFI-SW-C-7619 00 KAIG3-RFI-SW-C-7619-00
KAIG3-RFI-SW-C-7618 00 KAIG3-RFI-SW-C-7618-00
KAIG3-RFI-SW-C-7615 00 KAIG3-RFI-SW-C-7615-00
KAIG3-RFI-SW-C-7614 00 KAIG3-RFI-SW-C-7614-00
KAIG3-RFI-SW-C-7613 00 KAIG3-RFI-SW-C-7613-00
KAIG3-RFI-SW-E-0585 00 KAIG3-RFI-SW-E-0585-00
KAIG3-RFI-SW-E-0584 00 KAIG3-RFI-SW-E-0584-00
KAIG3-RFI-SW-E-0583 00 KAIG3-RFI-SW-E-0583-00
KAIG3-RFI-SW-E-0582 00 KAIG3-RFI-SW-E-0582-00
KAIG3-RFI-SW-E-0581 00 KAIG3-RFI-SW-E-0581-00
KAIG3-RFI-SW-E-0580 00 KAIG3-RFI-SW-E-0580-00
KAIG3-RFI-MB-E-0578 00 KAIG3-RFI-MB-E-0578-00
KAIG3-RFI-MC-S-9166 00 KAIG3-RFI-MC-S-9166-00
KAIG3-RFI-CO-S-9224 00 KAIG3-RFI-CO-S-9224-00
KAIG3-RFI-MC-S-9240 00 KAIG3-RFI-MC-S-9240-00
KAIG3-RFI-RG-C-7616 00 KAIG3-RFI-RG-C-7616-00
KAIG3-RFI-MC-C-7599 00 KAIG3-RFI-MC-C-7599-00
KAIG3-RFI-VG-S-9243 00 KAIG3-RFI-VG-S-9243-00
KAIG3-RFI-MC-S-9241 00 KAIG3-RFI-MC-S-9241-00
KAIG3-RFI-MC-S-9242 00 KAIG3-RFI-MC-S-9242-00
KAIG3-RFI-CO-C-7598 00 KAIG3-RFI-CO-C-7598-00
KAIG3-RFI-CO-S-9119 00 KAIG3-RFI-CO-S-9119-00
KAIG3-RFI-CO-C-7596 00 KAIG3-RFI-CO-C-7596-00
KAIG3-RFI-CO-A-1040 00 KAIG3-RFI-CO-A-1040-00
KAIG3-RFI-CO-A-1037 00 KAIG3-RFI-CO-A-1037-00
KAIG3-RFI-CO-S-9229 00 KAIG3-RFI-CO-S-9229-00
KAIG3-RFI-SW-P-0303 00 KAIG3-RFI-SW-P-0303-00
KAIG3-RFI-SW-P-0302 00 KAIG3-RFI-SW-P-0302-00
KAIG3-RFI-CF-P-0301 00 KAIG3-RFI-CF-P-0301-00
KAIG3-RFI-SW-C-7612 00 KAIG3-RFI-SW-C-7612-00
KAIG3-RFI-SW-C-7611 00 KAIG3-RFI-SW-C-7611-00
KAIG3-RFI-SW-C-7610 00 KAIG3-RFI-SW-C-7610-00
KAIG3-RFI-SW-C-7609 00 KAIG3-RFI-SW-C-7609-00
KAIG3-RFI-SW-C-7608 00 KAIG3-RFI-SW-C-7608-00
KAIG3-RFI-SW-C-7607 00 KAIG3-RFI-SW-C-7607-00
KAIG3-RFI-SW-C-7606 00 KAIG3-RFI-SW-C-7606-00
KAIG3-RFI-SW-C-7605 00 KAIG3-RFI-SW-C-7605-00
KAIG3-RFI-SW-C-7604 00 KAIG3-RFI-SW-C-7604-00
KAIG3-RFI-SW-C-7603 00 KAIG3-RFI-SW-C-7603-00
KAIG3-RFI-SW-C-7590 00 KAIG3-RFI-SW-C-7590-00
KAIG3-RFI-SW-C-7589 00 KAIG3-RFI-SW-C-7589-00
KAIG3-RFI-SW-C-7588 00 KAIG3-RFI-SW-C-7588-00
KAIG3-RFI-SW-C-7587 00 KAIG3-RFI-SW-C-7587-00
KAIG3-RFI-SW-C-7586 00 KAIG3-RFI-SW-C-7586-00
KAIG3-RFI-SW-C-7585 00 KAIG3-RFI-SW-C-7585-00
KAIG3-RFI-SW-C-7584 00 KAIG3-RFI-SW-C-7584-00
KAIG3-RFI-SW-C-7583 00 KAIG3-RFI-SW-C-7583-00
KAIG3-RFI-SW-C-7582 00 KAIG3-RFI-SW-C-7582-00
KAIG3-RFI-SW-C-7581 00 KAIG3-RFI-SW-C-7581-00
KAIG3-RFI-SW-C-7580 00 KAIG3-RFI-SW-C-7580-00
KAIG3-RFI-SW-C-7579 00 KAIG3-RFI-SW-C-7579-00
KAIG3-RFI-SW-C-7578 00 KAIG3-RFI-SW-C-7578-00
KAIG3-RFI-SW-C-7577 00 KAIG3-RFI-SW-C-7577-00
KAIG3-RFI-SW-C-7576 00 KAIG3-RFI-SW-C-7576-00
KAIG3-RFI-SW-C-7575 00 KAIG3-RFI-SW-C-7575-00
KAIG3-RFI-WG-LS-1552 00 KAIG3-RFI-WG-LS-1552-00
KAIG3-RFI-WG-LS-1551 00 KAIG3-RFI-WG-LS-1551-00
KAIG3-RFI-SW-C-7595 00 KAIG3-RFI-SW-C-7595-00
KAIG3-RFI-WG-C-7594 00 KAIG3-RFI-WG-C-7594-00
KAIG3-RFI-PG-C-7593 00 KAIG3-RFI-PG-C-7593-00
KAIG3-RFI-PG-C-7592 00 KAIG3-RFI-PG-C-7592-00
KAIG3-RFI-PG-C-7591 00 KAIG3-RFI-PG-C-7591-00
KAIG3-RFI-TG-S-9235 00 KAIG3-RFI-TG-S-9235-00
KAIG3-RFI-TG-S-9234 00 KAIG3-RFI-TG-S-9234-00
KAIG3-RFI-WG-S-9233 00 KAIG3-RFI-WG-S-9233-00
KAIG3-RFI-EC-S-9232 00 KAIG3-RFI-EC-S-9232-00
KAIG3-RFI-CO-S-9238 00 KAIG3-RFI-CO-S-9238-00
KAIG3-RFI-EC-SU-2998 00 KAIG3-RFI-EC-SU-2998-00
KAIG3-RFI-CO-S-9237 00 KAIG3-RFI-CO-S-9237-00
KAIG3-RFI-CO-S-9236 00 KAIG3-RFI-CO-S-9236-00
KAIG3-RFI-CO-A-1020 01 KAIG3-RFI-CO-A-1020-01
KAIG3-RFI-CO-A-1021 01 KAIG3-RFI-CO-A-1021-01
KAIG3-RFI-CO-SU-3003 00 KAIG3-RFI-CO-SU-3003-00
KAIG3-RFI-CO-S-9231 00 KAIG3-RFI-CO-S-9231-00
KAIG3-RFI-CO-S-9230 00 KAIG3-RFI-CO-S-9230-00
KAIG3-RFI-CO-S-8948 01 KAIG3-RFI-CO-S-8948-01
KAIG3-RFI-CO-A-1038 00 KAIG3-RFI-CO-A-1038-00
KAIG3-RFI-CO-C-7600 00 KAIG3-RFI-CO-C-7600-00
KAIG3-RFI-CO-S-9087 00 KAIG3-RFI-CO-S-9087-00
KAIG3-RFI-CO-SU-3002 00 KAIG3-RFI-CO-SU-3002-00
KAIG3-RFI-CO-S-9228 00 KAIG3-RFI-CO-S-9228-00
KAIG3-RFI-CO-S-9227 00 KAIG3-RFI-CO-S-9227-00
KAIG3-RFI-SW-C-7602 00 KAIG3-RFI-SW-C-7602-00
KAIG3-RFI-CO-S-9226 00 KAIG3-RFI-CO-S-9226-00
KAIG3-RFI-SW-C-7601 00 KAIG3-RFI-SW-C-7601-00
KAIG3-RFI-CO-S-9225 00 KAIG3-RFI-CO-S-9225-00
KAIG3-RFI-CO-S-9222 00 KAIG3-RFI-CO-S-9222-00
KAIG3-RFI-CO-S-9223 00 KAIG3-RFI-CO-S-9223-00
KAIG3-RFI-CO-S-9221 00 KAIG3-RFI-CO-S-9221-00
KAIG3-RFI-CO-S-8582 00 KAIG3-RFI-CO-S-8582-00
KAIG3-RFI-CO-S-9193 00 KAIG3-RFI-CO-S-9193-00
KAIG3-RFI-CO-C-7404 00 KAIG3-RFI-CO-C-7404-00
KAIG3-RFI-TB-E-0579 00 KAIG3-RFI-TB-E-0579-00
KAIG3-RFI-PC-E-0577 00 KAIG3-RFI-PC-E-0577-00
KAIG3-RFI-PC-E-0576 00 KAIG3-RFI-PC-E-0576-00
KAIG3-RFI-CO-SS-0436 00 KAIG3-RFI-CO-SS-0436-00
KAIG3-RFI-SW-LS-1550 00 KAIG3-RFI-SW-LS-1550-00
KAIG3-RFI-SW-LS-1549 00 KAIG3-RFI-SW-LS-1549-00
KAIG3-RFI-SW-LS-1548 00 KAIG3-RFI-SW-LS-1548-00
KAIG3-RFI-SW-LS-1547 00 KAIG3-RFI-SW-LS-1547-00
KAIG3-RFI-SW-LS-1546 00 KAIG3-RFI-SW-LS-1546-00
KAIG3-RFI-SW-LS-1545 00 KAIG3-RFI-SW-LS-1545-00
KAIG3-RFI-SW-C-7565 00 KAIG3-RFI-SW-C-7565-00
KAIG3-RFI-SW-C-7564 00 KAIG3-RFI-SW-C-7564-00
KAIG3-RFI-SW-C-7563 00 KAIG3-RFI-SW-C-7563-00
KAIG3-RFI-SW-C-7562 00 KAIG3-RFI-SW-C-7562-00
KAIG3-RFI-SW-C-7561 00 KAIG3-RFI-SW-C-7561-00
KAIG3-RFI-SW-C-7560 00 KAIG3-RFI-SW-C-7560-00
KAIG3-RFI-SW-C-7559 00 KAIG3-RFI-SW-C-7559-00
KAIG3-RFI-SW-C-7558 00 KAIG3-RFI-SW-C-7558-00
KAIG3-RFI-SW-C-7545 00 KAIG3-RFI-SW-C-7545-00
KAIG3-RFI-SW-C-7544 00 KAIG3-RFI-SW-C-7544-00
KAIG3-RFI-SW-C-7543 00 KAIG3-RFI-SW-C-7543-00
KAIG3-RFI-SW-C-7542 00 KAIG3-RFI-SW-C-7542-00
KAIG3-RFI-SW-C-7541 00 KAIG3-RFI-SW-C-7541-00
KAIG3-RFI-SW-C-7540 00 KAIG3-RFI-SW-C-7540-00
KAIG3-RFI-SW-C-7539 00 KAIG3-RFI-SW-C-7539-00
KAIG3-RFI-SW-C-7538 00 KAIG3-RFI-SW-C-7538-00
KAIG3-RFI-SW-C-7537 00 KAIG3-RFI-SW-C-7537-00
KAIG3-RFI-SW-C-7536 00 KAIG3-RFI-SW-C-7536-00
KAIG3-RFI-SW-C-7535 00 KAIG3-RFI-SW-C-7535-00
KAIG3-RFI-SW-C-7534 00 KAIG3-RFI-SW-C-7534-00
KAIG3-RFI-SW-C-7533 00 KAIG3-RFI-SW-C-7533-00
KAIG3-RFI-SW-C-7532 00 KAIG3-RFI-SW-C-7532-00
KAIG3-RFI-CO-S-9160 00 KAIG3-RFI-CO-S-9160-00
KAIG3-RFI-CO-S-9157 00 KAIG3-RFI-CO-S-9157-00
KAIG3-RFI-CO-S-9134 00 KAIG3-RFI-CO-S-9134-00
KAIG3-RFI-MC-SU-2975 00 KAIG3-RFI-MC-SU-2975-00
KAIG3-RFI-RG-SU-3001 00 KAIG3-RFI-RG-SU-3001-00
KAIG3-RFI-CO-S-9213 00 KAIG3-RFI-CO-S-9213-00
KAIG3-RFI-CO-S-9214 00 KAIG3-RFI-CO-S-9214-00
KAIG3-RFI-CO-SU-2994 00 KAIG3-RFI-CO-SU-2994-00
KAIG3-RFI-SW-C-7531 00 KAIG3-RFI-SW-C-7531-00
KAIG3-RFI-CO-SU-2996 00 KAIG3-RFI-CO-SU-2996-00
KAIG3-RFI-CO-S-8856 01 KAIG3-RFI-CO-S-8856-01
KAIG3-RFI-EC-S-8487 01 KAIG3-RFI-EC-S-8487-01
KAIG3-RFI-CO-S-8331 01 KAIG3-RFI-CO-S-8331-01
KAIG3-RFI-TG-S-9199 00 KAIG3-RFI-TG-S-9199-00
KAIG3-RFI-CO-S-9107 00 KAIG3-RFI-CO-S-9107-00
KAIG3-RFI-AG-C-7574 00 KAIG3-RFI-AG-C-7574-00
KAIG3-RFI-CO-S-9218 00 KAIG3-RFI-CO-S-9218-00
KAIG3-RFI-WG-C-7573 00 KAIG3-RFI-WG-C-7573-00
KAIG3-RFI-CO-S-9219 00 KAIG3-RFI-CO-S-9219-00
KAIG3-RFI-WG-C-7572 00 KAIG3-RFI-WG-C-7572-00
KAIG3-RFI-CO-S-9220 00 KAIG3-RFI-CO-S-9220-00
KAIG3-RFI-WG-C-7571 00 KAIG3-RFI-WG-C-7571-00
KAIG3-RFI-CO-SU-3000 00 KAIG3-RFI-CO-SU-3000-00
KAIG3-RFI-SW-C-7570 00 KAIG3-RFI-SW-C-7570-00
KAIG3-RFI-CO-S-9216 00 KAIG3-RFI-CO-S-9216-00
KAIG3-RFI-EC-C-7569 00 KAIG3-RFI-EC-C-7569-00
KAIG3-RFI-PG-C-7568 00 KAIG3-RFI-PG-C-7568-00
KAIG3-RFI-PG-C-7567 00 KAIG3-RFI-PG-C-7567-00
KAIG3-RFI-PG-C-7566 00 KAIG3-RFI-PG-C-7566-00
KAIG3-RFI-CO-S-9217 00 KAIG3-RFI-CO-S-9217-00
KAIG3-RFI-CO-S-9215 00 KAIG3-RFI-CO-S-9215-00
KAIG3-RFI-CO-SU-2997 00 KAIG3-RFI-CO-SU-2997-00
KAIG3-RFI-MC-S-9211 00 KAIG3-RFI-MC-S-9211-00
KAIG3-RFI-MC-S-9212 00 KAIG3-RFI-MC-S-9212-00
KAIG3-RFI-MC-S-9210 00 KAIG3-RFI-MC-S-9210-00
KAIG3-RFI-MC-SU-2995 00 KAIG3-RFI-MC-SU-2995-00
KAIG3-RFI-MC-C-7507 00 KAIG3-RFI-MC-C-7507-00
KAIG3-RFI-CO-C-7477 00 KAIG3-RFI-CO-C-7477-00
KAIG3-RFI-PG-C-7003 01 KAIG3-RFI-PG-C-7003-01
KAIG3-RFI-PG-C-7004 01 KAIG3-RFI-PG-C-7004-01
KAIG3-RFI-TB-S-9202 00 KAIG3-RFI-TB-S-9202-00
KAIG3-RFI-EC-S-9201 00 KAIG3-RFI-EC-S-9201-00
KAIG3-RFI-WG-S-9200 00 KAIG3-RFI-WG-S-9200-00
KAIG3-RFI-TB-SU-2989 00 KAIG3-RFI-TB-SU-2989-00
KAIG3-RFI-TB-SU-2990 00 KAIG3-RFI-TB-SU-2990-00
KAIG3-RFI-WG-SU-2988 00 KAIG3-RFI-WG-SU-2988-00
KAIG3-RFI-WG-C-7553 00 KAIG3-RFI-WG-C-7553-00
KAIG3-RFI-AG-C-7552 00 KAIG3-RFI-AG-C-7552-00
KAIG3-RFI-AG-C-7551 00 KAIG3-RFI-AG-C-7551-00
KAIG3-RFI-SW-C-7550 00 KAIG3-RFI-SW-C-7550-00
KAIG3-RFI-SW-C-7549 00 KAIG3-RFI-SW-C-7549-00
KAIG3-RFI-WG-C-7548 00 KAIG3-RFI-WG-C-7548-00
KAIG3-RFI-ZG-C-7547 00 KAIG3-RFI-ZG-C-7547-00
KAIG3-RFI-CO-SU-2991 00 KAIG3-RFI-CO-SU-2991-00
KAIG3-RFI-CO-S-9205 00 KAIG3-RFI-CO-S-9205-00
KAIG3-RFI-CO-S-9206 00 KAIG3-RFI-CO-S-9206-00
KAIG3-RFI-VG-S-9207 00 KAIG3-RFI-VG-S-9207-00
KAIG3-RFI-VG-S-9208 00 KAIG3-RFI-VG-S-9208-00
KAIG3-RFI-VG-S-9209 00 KAIG3-RFI-VG-S-9209-00
KAIG3-RFI-VG-SU-2992 00 KAIG3-RFI-VG-SU-2992-00
KAIG3-RFI-VG-SU-2993 00 KAIG3-RFI-VG-SU-2993-00
KAIG3-RFI-CO-C-7556 00 KAIG3-RFI-CO-C-7556-00
KAIG3-RFI-CO-C-7557 00 KAIG3-RFI-CO-C-7557-00
KAIG3-RFI-RG-C-7554 00 KAIG3-RFI-RG-C-7554-00
KAIG3-RFI-MC-C-7555 00 KAIG3-RFI-MC-C-7555-00
KAIG3-RFI-CO-SU-2986 00 KAIG3-RFI-CO-SU-2986-00
KAIG3-RFI-CO-S-9192 00 KAIG3-RFI-CO-S-9192-00
KAIG3-RFI-MC-SU-2987 00 KAIG3-RFI-MC-SU-2987-00
KAIG3-RFI-MC-S-9194 00 KAIG3-RFI-MC-S-9194-00
KAIG3-RFI-MC-S-9195 00 KAIG3-RFI-MC-S-9195-00
KAIG3-RFI-CO-S-9173 00 KAIG3-RFI-CO-S-9173-00
KAIG3-RFI-CO-A-1034 00 KAIG3-RFI-CO-A-1034-00
KAIG3-RFI-NA-C-7546 00 KAIG3-RFI-NA-C-7546-00
KAIG3-RFI-CO-S-9196 00 KAIG3-RFI-CO-S-9196-00
KAIG3-RFI-CO-S-9198 00 KAIG3-RFI-CO-S-9198-00
KAIG3-RFI-CO-S-9203 00 KAIG3-RFI-CO-S-9203-00
KAIG3-RFI-CO-S-9204 00 KAIG3-RFI-CO-S-9204-00
KAIG3-RFI-CO-S-9185 00 KAIG3-RFI-CO-S-9185-00
KAIG3-RFI-CO-S-9186 00 KAIG3-RFI-CO-S-9186-00
KAIG3-RFI-CO-S-9184 00 KAIG3-RFI-CO-S-9184-00
KAIG3-RFI-CO-S-9187 00 KAIG3-RFI-CO-S-9187-00
KAIG3-RFI-CO-S-9188 00 KAIG3-RFI-CO-S-9188-00
KAIG3-RFI-CO-S-9140 00 KAIG3-RFI-CO-S-9140-00
KAIG3-RFI-CO-C-9137 00 KAIG3-RFI-CO-C-9137-00
KAIG3-RFI-CO-SS-0434 00 KAIG3-RFI-CO-SS-0434-00
KAIG3-RFI-CO-SS-0435 00 KAIG3-RFI-CO-SS-0435-00
KAIG3-RFI-CO-SS-0433 00 KAIG3-RFI-CO-SS-0433-00
KAIG3-RFI-CO-S-9189 00 KAIG3-RFI-CO-S-9189-00
KAIG3-RFI-TT-E-0575 00 KAIG3-RFI-TT-E-0575-00
KAIG3-RFI-TT-LC-0800 00 KAIG3-RFI-TT-LC-0800-00
KAIG3-RFI-TT-LC-0799 00 KAIG3-RFI-TT-LC-0799-00
KAIG3-RFI-TT-LC-0798 00 KAIG3-RFI-TT-LC-0798-00
KAIG3-RFI-WG-C-7527 00 KAIG3-RFI-WG-C-7527-00
KAIG3-RFI-SW-A-1033 00 KAIG3-RFI-SW-A-1033-00
KAIG3-RFI-SW-A-1032 00 KAIG3-RFI-SW-A-1032-00
KAIG3-RFI-WG-LS-1544 00 KAIG3-RFI-WG-LS-1544-00
KAIG3-RFI-WG-LS-1543 00 KAIG3-RFI-WG-LS-1543-00
KAIG3-RFI-WG-LS-1542 00 KAIG3-RFI-WG-LS-1542-00
KAIG3-RFI-WG-LS-1541 00 KAIG3-RFI-WG-LS-1541-00
KAIG3-RFI-PG-LS-1540 00 KAIG3-RFI-PG-LS-1540-00
KAIG3-RFI-EC-S-9183 00 KAIG3-RFI-EC-S-9183-00
KAIG3-RFI-EC-S-9182 00 KAIG3-RFI-EC-S-9182-00
KAIG3-RFI-EC-S-9181 00 KAIG3-RFI-EC-S-9181-00
KAIG3-RFI-EC-SU-2985 00 KAIG3-RFI-EC-SU-2985-00
KAIG3-RFI-SW-LS-1539 00 KAIG3-RFI-SW-LS-1539-00
KAIG3-RFI-SW-C-7523 00 KAIG3-RFI-SW-C-7523-00
KAIG3-RFI-SW-C-7522 00 KAIG3-RFI-SW-C-7522-00
KAIG3-RFI-SW-C-7521 00 KAIG3-RFI-SW-C-7521-00
KAIG3-RFI-SW-C-7520 00 KAIG3-RFI-SW-C-7520-00
KAIG3-RFI-SW-C-7519 00 KAIG3-RFI-SW-C-7519-00
KAIG3-RFI-SW-C-7518 00 KAIG3-RFI-SW-C-7518-00
KAIG3-RFI-SW-C-7517 00 KAIG3-RFI-SW-C-7517-00
KAIG3-RFI-SW-C-7516 00 KAIG3-RFI-SW-C-7516-00
KAIG3-RFI-SW-C-7515 00 KAIG3-RFI-SW-C-7515-00
KAIG3-RFI-SW-C-7514 00 KAIG3-RFI-SW-C-7514-00
KAIG3-RFI-SW-C-7513 00 KAIG3-RFI-SW-C-7513-00
KAIG3-RFI-SW-C-7512 00 KAIG3-RFI-SW-C-7512-00
KAIG3-RFI-SW-C-7511 00 KAIG3-RFI-SW-C-7511-00
KAIG3-RFI-SW-C-7510 00 KAIG3-RFI-SW-C-7510-00
KAIG3-RFI-SW-C-7509 00 KAIG3-RFI-SW-C-7509-00
KAIG3-RFI-SW-C-7503 00 KAIG3-RFI-SW-C-7503-00
KAIG3-RFI-EC-C-7526 00 KAIG3-RFI-EC-C-7526-00
KAIG3-RFI-CG-SU-2984 00 KAIG3-RFI-CG-SU-2984-00
KAIG3-RFI-CO-S-9171 00 KAIG3-RFI-CO-S-9171-00
KAIG3-RFI-CO-S-9172 00 KAIG3-RFI-CO-S-9172-00
KAIG3-RFI-CO-SU-2979 00 KAIG3-RFI-CO-SU-2979-00
KAIG3-RFI-CO-S-9174 00 KAIG3-RFI-CO-S-9174-00
KAIG3-RFI-CO-S-9175 00 KAIG3-RFI-CO-S-9175-00
KAIG3-RFI-MC-C-7529 00 KAIG3-RFI-MC-C-7529-00
KAIG3-RFI-RG-C-7528 00 KAIG3-RFI-RG-C-7528-00
KAIG3-RFI-CO-S-9176 00 KAIG3-RFI-CO-S-9176-00
KAIG3-RFI-CO-SU-2980 00 KAIG3-RFI-CO-SU-2980-00
KAIG3-RFI-CO-SU-2981 00 KAIG3-RFI-CO-SU-2981-00
KAIG3-RFI-CO-SU-2982 00 KAIG3-RFI-CO-SU-2982-00
KAIG3-RFI-LM-S-9178 00 KAIG3-RFI-LM-S-9178-00
KAIG3-RFI-LM-S-9179 00 KAIG3-RFI-LM-S-9179-00
KAIG3-RFI-LM-S-9180 00 KAIG3-RFI-LM-S-9180-00
KAIG3-RFI-CO-SU-2978 00 KAIG3-RFI-CO-SU-2978-00
KAIG3-RFI-LM-SU-2983 00 KAIG3-RFI-LM-SU-2983-00
KAIG3-RFI-WG-C-7251 00 KAIG3-RFI-WG-C-7251-00
KAIG3-RFI-CO-SS-0416 00 KAIG3-RFI-CO-SS-0416-00
KAIG3-RFI-CO-SS-0417 00 KAIG3-RFI-CO-SS-0417-00
KAIG3-RFI-AG-SS-0426 00 KAIG3-RFI-AG-SS-0426-00
KAIG3-RFI-MC-SU-2977 00 KAIG3-RFI-MC-SU-2977-00
KAIG3-RFI-CO-S-9164 00 KAIG3-RFI-CO-S-9164-00
KAIG3-RFI-CO-S-9169 00 KAIG3-RFI-CO-S-9169-00
KAIG3-RFI-CO-S-9170 00 KAIG3-RFI-CO-S-9170-00
KAIG3-RFI-CO-S-9074 00 KAIG3-RFI-CO-S-9074-00
KAIG3-RFI-CO-SU-2954 00 KAIG3-RFI-CO-SU-2954-00
KAIG3-RFI-VG-SU-2926 00 KAIG3-RFI-VG-SU-2926-00
KAIG3-RFI-CO-S-9012 00 KAIG3-RFI-CO-S-9012-00
KAIG3-RFI-CF-C-7103 00 KAIG3-RFI-CF-C-7103-00
KAIG3-RFI-CF-C-7340 00 KAIG3-RFI-CF-C-7340-00
KAIG3-RFI-CF-S-8935 00 KAIG3-RFI-CF-S-8935-00
KAIG3-RFI-CO-S-9133 00 KAIG3-RFI-CO-S-9133-00
KAIG3-RFI-CO-S-9162 00 KAIG3-RFI-CO-S-9162-00
KAIG3-RFI-CO-S-9163 00 KAIG3-RFI-CO-S-9163-00
KAIG3-RFI-LM-S-9165 00 KAIG3-RFI-LM-S-9165-00
KAIG3-RFI-CO-SU-2957 00 KAIG3-RFI-CO-SU-2957-00
KAIG3-RFI-CF-C-7341 00 KAIG3-RFI-CF-C-7341-00
KAIG3-RFI-CO-C-7506 00 KAIG3-RFI-CO-C-7506-00
KAIG3-RFI-CO-S-9156 00 KAIG3-RFI-CO-S-9156-00
KAIG3-RFI-MC-S-9167 00 KAIG3-RFI-MC-S-9167-00
KAIG3-RFI-ZG-LC-0797 00 KAIG3-RFI-ZG-LC-0797-00
KAIG3-RFI-CO-S-9158 00 KAIG3-RFI-CO-S-9158-00
KAIG3-RFI-CO-S-9159 00 KAIG3-RFI-CO-S-9159-00
KAIG3-RFI-MB-LC-0791 00 KAIG3-RFI-MB-LC-0791-00
KAIG3-RFI-CO-S-9161 00 KAIG3-RFI-CO-S-9161-00
KAIG3-RFI-CO-C-7505 00 KAIG3-RFI-CO-C-7505-00
KAIG3-RFI-CO-C-7504 00 KAIG3-RFI-CO-C-7504-00
KAIG3-RFI-VG-S-9147 00 KAIG3-RFI-VG-S-9147-00
KAIG3-RFI-VG-S-9146 00 KAIG3-RFI-VG-S-9146-00
KAIG3-RFI-VG-S-9145 00 KAIG3-RFI-VG-S-9145-00
KAIG3-RFI-MC-C-7508 00 KAIG3-RFI-MC-C-7508-00
KAIG3-RFI-CO-SU-2976 00 KAIG3-RFI-CO-SU-2976-00
KAIG3-RFI-CO-S-9079 00 KAIG3-RFI-CO-S-9079-00
KAIG3-RFI-CO-S-8759 00 KAIG3-RFI-CO-S-8759-00
KAIG3-RFI-CO-S-9083 00 KAIG3-RFI-CO-S-9083-00
KAIG3-RFI-CO-S-9144 00 KAIG3-RFI-CO-S-9144-00
KAIG3-RFI-CO-S-8194 01 KAIG3-RFI-CO-S-8194-01
KAIG3-RFI-CO-S-8193 01 KAIG3-RFI-CO-S-8193-01
KAIG3-RFI-CO-S-9142 00 KAIG3-RFI-CO-S-9142-00
KAIG3-RFI-CO-SU-2973 00 KAIG3-RFI-CO-SU-2973-00
KAIG3-RFI-CO-S-9143 00 KAIG3-RFI-CO-S-9143-00
KAIG3-RFI-CO-S-9139 00 KAIG3-RFI-CO-S-9139-00
KAIG3-RFI-CO-S-9138 00 KAIG3-RFI-CO-S-9138-00
KAIG3-RFI-CO-S-9141 00 KAIG3-RFI-CO-S-9141-00
KAIG3-RFI-CO-S-8192 01 KAIG3-RFI-CO-S-8192-01
KAIG3-RFI-AG-SU-2974 00 KAIG3-RFI-AG-SU-2974-00
KAIG3-RFI-AG-SU-2973 00 KAIG3-RFI-AG-SU-2973-00
KAIG3-RFI-AG-C-7493 00 KAIG3-RFI-AG-C-7493-00
KAIG3-RFI-AG-C-7492 00 KAIG3-RFI-AG-C-7492-00
KAIG3-RFI-WG-S-9153 00 KAIG3-RFI-WG-S-9153-00
KAIG3-RFI-WG-S-9152 00 KAIG3-RFI-WG-S-9152-00
KAIG3-RFI-WG-S-8542 01 KAIG3-RFI-WG-S-8542-01
KAIG3-RFI-WG-S-9155 00 KAIG3-RFI-WG-S-9155-00
KAIG3-RFI-WG-S-9154 00 KAIG3-RFI-WG-S-9154-00
KAIG3-RFI-TG-SU-2961 00 KAIG3-RFI-TG-SU-2961-00
KAIG3-RFI-PC-LC-0796 00 KAIG3-RFI-PC-LC-0796-00
KAIG3-RFI-PC-LC-0795 00 KAIG3-RFI-PC-LC-0795-00
KAIG3-RFI-CO-S-9135 00 KAIG3-RFI-CO-S-9135-00
KAIG3-RFI-CO-SU-2964 00 KAIG3-RFI-CO-SU-2964-00
KAIG3-RFI-CO-S-9123 00 KAIG3-RFI-CO-S-9123-00
KAIG3-RFI-MC-S-9125 00 KAIG3-RFI-MC-S-9125-00
KAIG3-RFI-MC-S-9126 00 KAIG3-RFI-MC-S-9126-00
KAIG3-RFI-CO-A-1027 00 KAIG3-RFI-CO-A-1027-00
KAIG3-RFI-CO-A-1026 00 KAIG3-RFI-CO-A-1026-00
KAIG3-RFI-MC-SU-2968 00 KAIG3-RFI-MC-SU-2968-00
KAIG3-RFI-SW-P-0300 00 KAIG3-RFI-SW-P-0300-00
KAIG3-RFI-CO-A-1025 00 KAIG3-RFI-CO-A-1025-00
KAIG3-RFI-CO-A-1024 00 KAIG3-RFI-CO-A-1024-00
KAIG3-RFI-SW-P-0299 00 KAIG3-RFI-SW-P-0299-00
KAIG3-RFI-CC-P-0298 00 KAIG3-RFI-CC-P-0298-00
KAIG3-RFI-PC-P-0297 00 KAIG3-RFI-PC-P-0297-00
KAIG3-RFI-CO-A-1016 00 KAIG3-RFI-CO-A-1016-00
KAIG3-RFI-SW-LS-1534 00 KAIG3-RFI-SW-LS-1534-00
KAIG3-RFI-SW-C-7498 00 KAIG3-RFI-SW-C-7498-00
KAIG3-RFI-SW-C-7497 00 KAIG3-RFI-SW-C-7497-00
KAIG3-RFI-SW-C-7496 00 KAIG3-RFI-SW-C-7496-00
KAIG3-RFI-SW-C-7495 00 KAIG3-RFI-SW-C-7495-00
KAIG3-RFI-SW-C-7494 00 KAIG3-RFI-SW-C-7494-00
KAIG3-RFI-SW-C-7490 00 KAIG3-RFI-SW-C-7490-00
KAIG3-RFI-SW-C-7489 00 KAIG3-RFI-SW-C-7489-00
KAIG3-RFI-SW-C-7488 00 KAIG3-RFI-SW-C-7488-00
KAIG3-RFI-SW-C-7487 00 KAIG3-RFI-SW-C-7487-00
KAIG3-RFI-SW-C-7486 00 KAIG3-RFI-SW-C-7486-00
KAIG3-RFI-EC-S-9151 00 KAIG3-RFI-EC-S-9151-00
KAIG3-RFI-SW-C-7485 00 KAIG3-RFI-SW-C-7485-00
KAIG3-RFI-EC-S-9150 00 KAIG3-RFI-EC-S-9150-00
KAIG3-RFI-SW-C-7484 00 KAIG3-RFI-SW-C-7484-00
KAIG3-RFI-SW-C-7483 00 KAIG3-RFI-SW-C-7483-00
KAIG3-RFI-EC-S-9149 00 KAIG3-RFI-EC-S-9149-00
KAIG3-RFI-TB-S-9148 00 KAIG3-RFI-TB-S-9148-00
KAIG3-RFI-SW-C-7482 00 KAIG3-RFI-SW-C-7482-00
KAIG3-RFI-SW-C-7481 00 KAIG3-RFI-SW-C-7481-00
KAIG3-RFI-SW-C-7480 00 KAIG3-RFI-SW-C-7480-00
KAIG3-RFI-MC-S-9124 00 KAIG3-RFI-MC-S-9124-00
KAIG3-RFI-CO-S-9127 00 KAIG3-RFI-CO-S-9127-00
KAIG3-RFI-EC-S-9128 00 KAIG3-RFI-EC-S-9128-00
KAIG3-RFI-EC-S-9129 00 KAIG3-RFI-EC-S-9129-00
KAIG3-RFI-EC-SU-2969 00 KAIG3-RFI-EC-SU-2969-00
KAIG3-RFI-MC-SU-2970 00 KAIG3-RFI-MC-SU-2970-00
KAIG3-RFI-CO-S-9132 00 KAIG3-RFI-CO-S-9132-00
KAIG3-RFI-MC-S-9130 00 KAIG3-RFI-MC-S-9130-00
KAIG3-RFI-CO-SU-2971 00 KAIG3-RFI-CO-SU-2971-00
KAIG3-RFI-VG-S-8956 00 KAIG3-RFI-VG-S-8956-00
KAIG3-RFI-VG-S-9103 00 KAIG3-RFI-VG-S-9103-00
KAIG3-RFI-SW-LS-1538 00 KAIG3-RFI-SW-LS-1538-00
KAIG3-RFI-SW-LS-1537 00 KAIG3-RFI-SW-LS-1537-00
KAIG3-RFI-ZG-LS-1536 00 KAIG3-RFI-ZG-LS-1536-00
KAIG3-RFI-SG-LS-1535 00 KAIG3-RFI-SG-LS-1535-00
KAIG3-RFI-PC-LC-0794 00 KAIG3-RFI-PC-LC-0794-00
KAIG3-RFI-PC-LC-0793 00 KAIG3-RFI-PC-LC-0793-00
KAIG3-RFI-PC-LC-0792 00 KAIG3-RFI-PC-LC-0792-00
KAIG3-RFI-SW-C-7470 00 KAIG3-RFI-SW-C-7470-00
KAIG3-RFI-TG-LS-1533 00 KAIG3-RFI-TG-LS-1533-00
KAIG3-RFI-TG-LS-1532 00 KAIG3-RFI-TG-LS-1532-00
KAIG3-RFI-TG-LS-1531 00 KAIG3-RFI-TG-LS-1531-00
KAIG3-RFI-TG-LS-1530 00 KAIG3-RFI-TG-LS-1530-00
KAIG3-RFI-TG-LS-1522 00 KAIG3-RFI-TG-LS-1522-00
KAIG3-RFI-TG-LS-1521 00 KAIG3-RFI-TG-LS-1521-00
KAIG3-RFI-WG-LS-1529 00 KAIG3-RFI-WG-LS-1529-00
KAIG3-RFI-SW-C-7473 00 KAIG3-RFI-SW-C-7473-00
KAIG3-RFI-WG-C-7472 00 KAIG3-RFI-WG-C-7472-00
KAIG3-RFI-WG-C-7471 00 KAIG3-RFI-WG-C-7471-00
KAIG3-RFI-TB-S-9122 00 KAIG3-RFI-TB-S-9122-00
KAIG3-RFI-WG-S-9114 00 KAIG3-RFI-WG-S-9114-00
KAIG3-RFI-WG-SU-2965 00 KAIG3-RFI-WG-SU-2965-00
KAIG3-RFI-CO-SU-2958 00 KAIG3-RFI-CO-SU-2958-00
KAIG3-RFI-CO-C-7479 00 KAIG3-RFI-CO-C-7479-00
KAIG3-RFI-CO-SU-2967 00 KAIG3-RFI-CO-SU-2967-00
KAIG3-RFI-CO-S-9118 00 KAIG3-RFI-CO-S-9118-00
KAIG3-RFI-CO-S-9117 00 KAIG3-RFI-CO-S-9117-00
KAIG3-RFI-CO-C-7478 00 KAIG3-RFI-CO-C-7478-00
KAIG3-RFI-WG-C-2007 01 KAIG3-RFI-WG-C-2007-01
KAIG3-RFI-DG-LS-1516 00 KAIG3-RFI-DG-LS-1516-00
KAIG3-RFI-WG-C-7454 00 KAIG3-RFI-WG-C-7454-00
KAIG3-RFI-TT-A-1029 00 KAIG3-RFI-TT-A-1029-00
KAIG3-RFI-AG-C-7455 00 KAIG3-RFI-AG-C-7455-00
KAIG3-RFI-PA-C-7475 00 KAIG3-RFI-PA-C-7475-00
KAIG3-RFI-PA-C-7474 00 KAIG3-RFI-PA-C-7474-00
KAIG3-RFI-SW-LS-1526 00 KAIG3-RFI-SW-LS-1526-00
KAIG3-RFI-SW-LS-1525 00 KAIG3-RFI-SW-LS-1525-00
KAIG3-RFI-SW-C-7469 00 KAIG3-RFI-SW-C-7469-00
KAIG3-RFI-SW-C-7468 00 KAIG3-RFI-SW-C-7468-00
KAIG3-RFI-SW-C-7467 00 KAIG3-RFI-SW-C-7467-00
KAIG3-RFI-SW-C-7466 00 KAIG3-RFI-SW-C-7466-00
KAIG3-RFI-SW-C-7465 00 KAIG3-RFI-SW-C-7465-00
KAIG3-RFI-SW-C-7464 00 KAIG3-RFI-SW-C-7464-00
KAIG3-RFI-SW-C-7463 00 KAIG3-RFI-SW-C-7463-00
KAIG3-RFI-SW-C-7462 00 KAIG3-RFI-SW-C-7462-00
KAIG3-RFI-SW-C-7461 00 KAIG3-RFI-SW-C-7461-00
KAIG3-RFI-SW-C-7459 00 KAIG3-RFI-SW-C-7459-00
KAIG3-RFI-SW-C-7458 00 KAIG3-RFI-SW-C-7458-00
KAIG3-RFI-SW-C-7450 00 KAIG3-RFI-SW-C-7450-00
KAIG3-RFI-SW-C-7449 00 KAIG3-RFI-SW-C-7449-00
KAIG3-RFI-SW-C-7448 00 KAIG3-RFI-SW-C-7448-00
KAIG3-RFI-CO-S-9110 00 KAIG3-RFI-CO-S-9110-00
KAIG3-RFI-CO-S-9111 00 KAIG3-RFI-CO-S-9111-00
KAIG3-RFI-CO-S-9112 00 KAIG3-RFI-CO-S-9112-00
KAIG3-RFI-CO-C-7476 00 KAIG3-RFI-CO-C-7476-00
KAIG3-RFI-CO-SU-2951 00 KAIG3-RFI-CO-SU-2951-00
KAIG3-RFI-CO-A-1030 00 KAIG3-RFI-CO-A-1030-00
KAIG3-RFI-CO-S-9104 00 KAIG3-RFI-CO-S-9104-00
KAIG3-RFI-CO-S-9105 00 KAIG3-RFI-CO-S-9105-00
KAIG3-RFI-CO-SU-2963 00 KAIG3-RFI-CO-SU-2963-00
KAIG3-RFI-CO-S-9106 00 KAIG3-RFI-CO-S-9106-00
KAIG3-RFI-CO-SU-2966 00 KAIG3-RFI-CO-SU-2966-00
KAIG3-RFI-CO-S-9108 00 KAIG3-RFI-CO-S-9108-00
KAIG3-RFI-CO-A-1031 00 KAIG3-RFI-CO-A-1031-00
KAIG3-RFI-CO-S-9109 00 KAIG3-RFI-CO-S-9109-00
KAIG3-RFI-CO-S-9115 00 KAIG3-RFI-CO-S-9115-00
KAIG3-RFI-CO-S-9116 00 KAIG3-RFI-CO-S-9116-00
KAIG3-RFI-CO-S-8922 00 KAIG3-RFI-CO-S-8922-00
KAIG3-RFI-SM-S-9101 00 KAIG3-RFI-SM-S-9101-00
KAIG3-RFI-CO-S-8928 00 KAIG3-RFI-CO-S-8928-00
KAIG3-RFI-CO-SU-2962 00 KAIG3-RFI-CO-SU-2962-00
KAIG3-RFI-SM-SU-2959 00 KAIG3-RFI-SM-SU-2959-00
KAIG3-RFI-SM-S-9100 00 KAIG3-RFI-SM-S-9100-00
KAIG3-RFI-CO-S-9096 00 KAIG3-RFI-CO-S-9096-00
KAIG3-RFI-CO-S-9088 00 KAIG3-RFI-CO-S-9088-00
KAIG3-RFI-CO-S-9089 00 KAIG3-RFI-CO-S-9089-00
KAIG3-RFI-SW-LS-1528 00 KAIG3-RFI-SW-LS-1528-00
KAIG3-RFI-CO-S-9090 00 KAIG3-RFI-CO-S-9090-00
KAIG3-RFI-RG-C-7229 01 KAIG3-RFI-RG-C-7229-01
KAIG3-RFI-CO-S-9097 00 KAIG3-RFI-CO-S-9097-00
KAIG3-RFI-CO-S-9098 00 KAIG3-RFI-CO-S-9098-00
KAIG3-RFI-CO-S-8813 01 KAIG3-RFI-CO-S-8813-01
KAIG3-RFI-CO-S-8993 00 KAIG3-RFI-CO-S-8993-00
KAIG3-RFI-MC-S-9063 00 KAIG3-RFI-MC-S-9063-00
KAIG3-RFI-CO-S-9000 00 KAIG3-RFI-CO-S-9000-00
KAIG3-RFI-CO-S-9002 00 KAIG3-RFI-CO-S-9002-00
KAIG3-RFI-CO-S-9095 00 KAIG3-RFI-CO-S-9095-00
KAIG3-RFI-LM-E-0574 00 KAIG3-RFI-LM-E-0574-00
KAIG3-RFI-CO-S-9086 00 KAIG3-RFI-CO-S-9086-00
KAIG3-RFI-TB-E-0572 01 KAIG3-RFI-TB-E-0572-01
KAIG3-RFI-CO-S-9113 00 KAIG3-RFI-CO-S-9113-00
KAIG3-RFI-LM-E-0568 01 KAIG3-RFI-LM-E-0568-01
KAIG3-RFI-PC-LC-0790 00 KAIG3-RFI-PC-LC-0790-00
KAIG3-RFI-PC-LC-0789 00 KAIG3-RFI-PC-LC-0789-00
KAIG3-RFI-TB-LC-0782 01 KAIG3-RFI-TB-LC-0782-01
KAIG3-RFI-SW-C-7443 00 KAIG3-RFI-SW-C-7443-00
KAIG3-RFI-PG-C-7456 00 KAIG3-RFI-PG-C-7456-00
KAIG3-RFI-SW-C-7457 00 KAIG3-RFI-SW-C-7457-00
KAIG3-RFI-WG-LS-1519 00 KAIG3-RFI-WG-LS-1519-00
KAIG3-RFI-TG-SU-2960 00 KAIG3-RFI-TG-SU-2960-00
KAIG3-RFI-ZG-C-7436 00 KAIG3-RFI-ZG-C-7436-00
KAIG3-RFI-WG-C-7451 00 KAIG3-RFI-WG-C-7451-00
KAIG3-RFI-SG-C-7435 00 KAIG3-RFI-SG-C-7435-00
KAIG3-RFI-DG-LS-1524 00 KAIG3-RFI-DG-LS-1524-00
KAIG3-RFI-DG-LS-1523 00 KAIG3-RFI-DG-LS-1523-00
KAIG3-RFI-CO-A-1017 00 KAIG3-RFI-CO-A-1017-00
KAIG3-RFI-TG-C-7386 00 KAIG3-RFI-TG-C-7386-00
KAIG3-RFI-CO-A-1015 00 KAIG3-RFI-CO-A-1015-00
KAIG3-RFI-WG-C-7410 00 KAIG3-RFI-WG-C-7410-00
KAIG3-RFI-WG-SU-2949 00 KAIG3-RFI-WG-SU-2949-00
KAIG3-RFI-PG-SU-2950 00 KAIG3-RFI-PG-SU-2950-00
KAIG3-RFI-PG-S-9065 00 KAIG3-RFI-PG-S-9065-00
KAIG3-RFI-AG-C-7430 00 KAIG3-RFI-AG-C-7430-00
KAIG3-RFI-TG-C-7401 00 KAIG3-RFI-TG-C-7401-00
KAIG3-RFI-AG-C-7431 00 KAIG3-RFI-AG-C-7431-00
KAIG3-RFI-WG-C-7426 00 KAIG3-RFI-WG-C-7426-00
KAIG3-RFI-SW-C-7411 00 KAIG3-RFI-SW-C-7411-00
KAIG3-RFI-WG-S-9071 00 KAIG3-RFI-WG-S-9071-00
KAIG3-RFI-WG-S-9064 00 KAIG3-RFI-WG-S-9064-00
KAIG3-RFI-WG-C-7403-00 00 KAIG3-RFI-WG-C-7403-00-00
KAIG3-RFI-WG-S-9047 00 KAIG3-RFI-WG-S-9047-00
KAIG3-RFI-WG-S-9041 00 KAIG3-RFI-WG-S-9041-00
KAIG3-RFI-WG-S-9044 00 KAIG3-RFI-WG-S-9044-00
KAIG3-RFI-WG-C-7402 00 KAIG3-RFI-WG-C-7402-00
KAIG3-RFI-PG-S-9046 00 KAIG3-RFI-PG-S-9046-00
KAIG3-RFI-SW-C-7447 00 KAIG3-RFI-SW-C-7447-00
KAIG3-RFI-SW-C-7446 00 KAIG3-RFI-SW-C-7446-00
KAIG3-RFI-SW-C-7445 00 KAIG3-RFI-SW-C-7445-00
KAIG3-RFI-SW-C-7444 00 KAIG3-RFI-SW-C-7444-00
KAIG3-RFI-SW-C-7441 00 KAIG3-RFI-SW-C-7441-00
KAIG3-RFI-CO-S-9085 00 KAIG3-RFI-CO-S-9085-00
KAIG3-RFI-SW-C-7440 00 KAIG3-RFI-SW-C-7440-00
KAIG3-RFI-SW-C-7439 00 KAIG3-RFI-SW-C-7439-00
KAIG3-RFI-CO-S-9094 00 KAIG3-RFI-CO-S-9094-00
KAIG3-RFI-SW-C-7438 00 KAIG3-RFI-SW-C-7438-00
KAIG3-RFI-SW-C-7437 00 KAIG3-RFI-SW-C-7437-00
KAIG3-RFI-SW-C-7425 00 KAIG3-RFI-SW-C-7425-00
KAIG3-RFI-CO-S-9093 00 KAIG3-RFI-CO-S-9093-00
KAIG3-RFI-SW-C-7424 00 KAIG3-RFI-SW-C-7424-00
KAIG3-RFI-MC-S-9080 00 KAIG3-RFI-MC-S-9080-00
KAIG3-RFI-SW-C-7392 00 KAIG3-RFI-SW-C-7392-00
KAIG3-RFI-MC-S-9081 00 KAIG3-RFI-MC-S-9081-00
KAIG3-RFI-SW-LS-1518 00 KAIG3-RFI-SW-LS-1518-00
KAIG3-RFI-MC-S-9084 00 KAIG3-RFI-MC-S-9084-00
KAIG3-RFI-SW-LS-1517 00 KAIG3-RFI-SW-LS-1517-00
KAIG3-RFI-CO-S-9082 00 KAIG3-RFI-CO-S-9082-00
KAIG3-RFI-EC-S-9091 00 KAIG3-RFI-EC-S-9091-00
KAIG3-RFI-EC-S-9092 00 KAIG3-RFI-EC-S-9092-00
KAIG3-RFI-CO-S-9075 00 KAIG3-RFI-CO-S-9075-00
KAIG3-RFI-CO-S-9076 00 KAIG3-RFI-CO-S-9076-00
KAIG3-RFI-CO-C-7345 00 KAIG3-RFI-CO-C-7345-00
KAIG3-RFI-CO-C-7432 00 KAIG3-RFI-CO-C-7432-00
KAIG3-RFI-CO-C-7433 00 KAIG3-RFI-CO-C-7433-00
KAIG3-RFI-MC-C-7434 00 KAIG3-RFI-MC-C-7434-00
KAIG3-RFI-CO-S-8563 00 KAIG3-RFI-CO-S-8563-00
KAIG3-RFI-CO-S-8860 00 KAIG3-RFI-CO-S-8860-00
KAIG3-RFI-CO-S-8862 00 KAIG3-RFI-CO-S-8862-00
KAIG3-RFI-VG-S-9077 00 KAIG3-RFI-VG-S-9077-00
KAIG3-RFI-VG-S-9078 00 KAIG3-RFI-VG-S-9078-00
KAIG3-RFI-VG-SU-2955 00 KAIG3-RFI-VG-SU-2955-00
KAIG3-RFI-MC-S-8391 01 KAIG3-RFI-MC-S-8391-01
KAIG3-RFI-ST-S-8350 00 KAIG3-RFI-ST-S-8350-00
KAIG3-RFI-CF-S-8286 00 KAIG3-RFI-CF-S-8286-00
KAIG3-RFI-CO-S-8431 00 KAIG3-RFI-CO-S-8431-00
KAIG3-RFI-MC-SU-2790 01 KAIG3-RFI-MC-SU-2790-01
KAIG3-RFI-SW-C-7453 00 KAIG3-RFI-SW-C-7453-00
KAIG3-RFI-SW-C-7452 00 KAIG3-RFI-SW-C-7452-00
KAIG3-RFI-SW-LS-1520 00 KAIG3-RFI-SW-LS-1520-00
KAIG3-RFI-CO-S-8994 00 KAIG3-RFI-CO-S-8994-00
KAIG3-RFI-CO-S-8995 00 KAIG3-RFI-CO-S-8995-00
KAIG3-RFI-CO-SS-0428 00 KAIG3-RFI-CO-SS-0428-00
KAIG3-RFI-CO-SS-0429 00 KAIG3-RFI-CO-SS-0429-00
KAIG3-RFI-CO-SS-0431 00 KAIG3-RFI-CO-SS-0431-00
KAIG3-RFI-CO-SS-0424 00 KAIG3-RFI-CO-SS-0424-00
KAIG3-RFI-CO-SS-0425 00 KAIG3-RFI-CO-SS-0425-00
KAIG3-RFI-CO-SS-0423 00 KAIG3-RFI-CO-SS-0423-00
KAIG3-RFI-CO-SS-0422 00 KAIG3-RFI-CO-SS-0422-00
KAIG3-RFI-CO-SS-0421 00 KAIG3-RFI-CO-SS-0421-00
KAIG3-RFI-CO-SS-0105 01 KAIG3-RFI-CO-SS-0105-01
KAIG3-RFI-CO-SS-0432 00 KAIG3-RFI-CO-SS-0432-00
KAIG3-RFI-SW-LC-0707 01 KAIG3-RFI-SW-LC-0707-01
KAIG3-RFI-SW-E-0563 00 KAIG3-RFI-SW-E-0563-00
KAIG3-RFI-VG-C-7278 00 KAIG3-RFI-VG-C-7278-00
KAIG3-RFI-CF-C-7298 00 KAIG3-RFI-CF-C-7298-00
KAIG3-RFI-CO-S-7973 00 KAIG3-RFI-CO-S-7973-00
KAIG3-RFI-PC-E-0573 00 KAIG3-RFI-PC-E-0573-00
KAIG3-RFI-NA-LC-0786 00 KAIG3-RFI-NA-LC-0786-00
KAIG3-RFI-PC-LC-0785 00 KAIG3-RFI-PC-LC-0785-00
KAIG3-RFI-SW-LC-0708 01 KAIG3-RFI-SW-LC-0708-01
KAIG3-RFI-SW-C-7423 00 KAIG3-RFI-SW-C-7423-00
KAIG3-RFI-SW-C-7422 00 KAIG3-RFI-SW-C-7422-00
KAIG3-RFI-SW-C-7421 00 KAIG3-RFI-SW-C-7421-00
KAIG3-RFI-SW-C-7420 00 KAIG3-RFI-SW-C-7420-00
KAIG3-RFI-SW-C-7419 00 KAIG3-RFI-SW-C-7419-00
KAIG3-RFI-SW-C-7418 00 KAIG3-RFI-SW-C-7418-00
KAIG3-RFI-SW-C-7417 00 KAIG3-RFI-SW-C-7417-00
KAIG3-RFI-SW-C-7416 00 KAIG3-RFI-SW-C-7416-00
KAIG3-RFI-SW-C-7415 00 KAIG3-RFI-SW-C-7415-00
KAIG3-RFI-SW-C-7414 00 KAIG3-RFI-SW-C-7414-00
KAIG3-RFI-SW-C-7413 00 KAIG3-RFI-SW-C-7413-00
KAIG3-RFI-SW-C-7412 00 KAIG3-RFI-SW-C-7412-00
KAIG3-RFI-SW-C-7380 00 KAIG3-RFI-SW-C-7380-00
KAIG3-RFI-SW-C-7379 00 KAIG3-RFI-SW-C-7379-00
KAIG3-RFI-SW-C-7377 00 KAIG3-RFI-SW-C-7377-00
KAIG3-RFI-SW-LS-1515 00 KAIG3-RFI-SW-LS-1515-00
KAIG3-RFI-SW-LS-1514 00 KAIG3-RFI-SW-LS-1514-00
KAIG3-RFI-SW-C-7409 00 KAIG3-RFI-SW-C-7409-00
KAIG3-RFI-SW-C-7408 00 KAIG3-RFI-SW-C-7408-00
KAIG3-RFI-SW-C-7400 00 KAIG3-RFI-SW-C-7400-00
KAIG3-RFI-SW-C-7399 00 KAIG3-RFI-SW-C-7399-00
KAIG3-RFI-SW-C-7398 00 KAIG3-RFI-SW-C-7398-00
KAIG3-RFI-SW-C-7397 00 KAIG3-RFI-SW-C-7397-00
KAIG3-RFI-SW-C-7396 00 KAIG3-RFI-SW-C-7396-00
KAIG3-RFI-SW-C-7395 00 KAIG3-RFI-SW-C-7395-00
KAIG3-RFI-SW-C-7394 00 KAIG3-RFI-SW-C-7394-00
KAIG3-RFI-SW-C-7393 00 KAIG3-RFI-SW-C-7393-00
KAIG3-RFI-SW-C-7385 00 KAIG3-RFI-SW-C-7385-00
KAIG3-RFI-SW-C-7384 00 KAIG3-RFI-SW-C-7384-00
KAIG3-RFI-SW-C-7383 00 KAIG3-RFI-SW-C-7383-00
KAIG3-RFI-SW-C-7376 00 KAIG3-RFI-SW-C-7376-00
KAIG3-RFI-SW-C-7375 00 KAIG3-RFI-SW-C-7375-00
KAIG3-RFI-SW-C-7374 00 KAIG3-RFI-SW-C-7374-00
KAIG3-RFI-SW-C-7373 00 KAIG3-RFI-SW-C-7373-00
KAIG3-RFI-PA-C-7370 00 KAIG3-RFI-PA-C-7370-00
KAIG3-RFI-PA-C-7369 00 KAIG3-RFI-PA-C-7369-00
KAIG3-RFI-SW-LS-1510 00 KAIG3-RFI-SW-LS-1510-00
KAIG3-RFI-SW-LS-1509 00 KAIG3-RFI-SW-LS-1509-00
KAIG3-RFI-SW-C-7382 00 KAIG3-RFI-SW-C-7382-00
KAIG3-RFI-CO-SU-2935 00 KAIG3-RFI-CO-SU-2935-00
KAIG3-RFI-CO-S-9059 00 KAIG3-RFI-CO-S-9059-00
KAIG3-RFI-SW-C-7381 00 KAIG3-RFI-SW-C-7381-00
KAIG3-RFI-CO-S-9060 00 KAIG3-RFI-CO-S-9060-00
KAIG3-RFI-SW-C-7372 00 KAIG3-RFI-SW-C-7372-00
KAIG3-RFI-CO-S-9061 00 KAIG3-RFI-CO-S-9061-00
KAIG3-RFI-SW-C-7371 00 KAIG3-RFI-SW-C-7371-00
KAIG3-RFI-SW-C-7368 00 KAIG3-RFI-SW-C-7368-00
KAIG3-RFI-CO-SU-2947 00 KAIG3-RFI-CO-SU-2947-00
KAIG3-RFI-SW-C-7367 00 KAIG3-RFI-SW-C-7367-00
KAIG3-RFI-CO-S-9066 00 KAIG3-RFI-CO-S-9066-00
KAIG3-RFI-SW-C-7366 00 KAIG3-RFI-SW-C-7366-00
KAIG3-RFI-CO-S-9067 00 KAIG3-RFI-CO-S-9067-00
KAIG3-RFI-CO-S-9068 00 KAIG3-RFI-CO-S-9068-00
KAIG3-RFI-MC-S-9072 00 KAIG3-RFI-MC-S-9072-00
KAIG3-RFI-CO-S-9073 00 KAIG3-RFI-CO-S-9073-00
KAIG3-RFI-MC-SU-2953 00 KAIG3-RFI-MC-SU-2953-00
KAIG3-RFI-CO-S-9070 00 KAIG3-RFI-CO-S-9070-00
KAIG3-RFI-SW-C-7365 00 KAIG3-RFI-SW-C-7365-00
KAIG3-RFI-SW-C-7364 00 KAIG3-RFI-SW-C-7364-00
KAIG3-RFI-MC-S-9062 00 KAIG3-RFI-MC-S-9062-00
KAIG3-RFI-SW-C-7363 00 KAIG3-RFI-SW-C-7363-00
KAIG3-RFI-SW-C-7362 00 KAIG3-RFI-SW-C-7362-00
KAIG3-RFI-MC-SU-2948 00 KAIG3-RFI-MC-SU-2948-00
KAIG3-RFI-SW-C-7361 00 KAIG3-RFI-SW-C-7361-00
KAIG3-RFI-SW-C-7360 00 KAIG3-RFI-SW-C-7360-00
KAIG3-RFI-SW-C-7359 00 KAIG3-RFI-SW-C-7359-00
KAIG3-RFI-SW-C-7355 00 KAIG3-RFI-SW-C-7355-00
KAIG3-RFI-CO-S-9069 00 KAIG3-RFI-CO-S-9069-00
KAIG3-RFI-SW-C-7354 00 KAIG3-RFI-SW-C-7354-00
KAIG3-RFI-SW-C-7353 00 KAIG3-RFI-SW-C-7353-00
KAIG3-RFI-SW-C-7352 00 KAIG3-RFI-SW-C-7352-00
KAIG3-RFI-CO-SU-2952 00 KAIG3-RFI-CO-SU-2952-00
KAIG3-RFI-SW-C-7351 00 KAIG3-RFI-SW-C-7351-00
KAIG3-RFI-SW-C-7350 00 KAIG3-RFI-SW-C-7350-00
KAIG3-RFI-SW-C-7349 00 KAIG3-RFI-SW-C-7349-00
KAIG3-RFI-CO-S-8975 00 KAIG3-RFI-CO-S-8975-00
KAIG3-RFI-SW-C-7348 00 KAIG3-RFI-SW-C-7348-00
KAIG3-RFI-EC-S-9055 00 KAIG3-RFI-EC-S-9055-00
KAIG3-RFI-SW-C-7330 00 KAIG3-RFI-SW-C-7330-00
KAIG3-RFI-MC-C-7405 00 KAIG3-RFI-MC-C-7405-00
KAIG3-RFI-SW-C-7329 00 KAIG3-RFI-SW-C-7329-00
KAIG3-RFI-SW-C-7328 00 KAIG3-RFI-SW-C-7328-00
KAIG3-RFI-SW-C-7327 00 KAIG3-RFI-SW-C-7327-00
KAIG3-RFI-CO-C-7406 00 KAIG3-RFI-CO-C-7406-00
KAIG3-RFI-CO-S-9028 00 KAIG3-RFI-CO-S-9028-00
KAIG3-RFI-CO-SU-2944 00 KAIG3-RFI-CO-SU-2944-00
KAIG3-RFI-CO-C-7407 00 KAIG3-RFI-CO-C-7407-00
KAIG3-RFI-PC-S-9057 00 KAIG3-RFI-PC-S-9057-00
KAIG3-RFI-PC-S-9058 00 KAIG3-RFI-PC-S-9058-00
KAIG3-RFI-PC-SU-2946 00 KAIG3-RFI-PC-SU-2946-00
KAIG3-RFI-CO-S-9045 00 KAIG3-RFI-CO-S-9045-00
KAIG3-RFI-CO-S-9050 00 KAIG3-RFI-CO-S-9050-00
KAIG3-RFI-CO-S-9053 00 KAIG3-RFI-CO-S-9053-00
KAIG3-RFI-CO-S-9049 00 KAIG3-RFI-CO-S-9049-00
KAIG3-RFI-CO-S-9054 00 KAIG3-RFI-CO-S-9054-00
KAIG3-RFI-LM-SU-2945 00 KAIG3-RFI-LM-SU-2945-00
KAIG3-RFI-LM-S-9043 00 KAIG3-RFI-LM-S-9043-00
KAIG3-RFI-LM-S-9042 00 KAIG3-RFI-LM-S-9042-00
KAIG3-RFI-CO-S-9035 00 KAIG3-RFI-CO-S-9035-00
KAIG3-RFI-CO-S-9036 00 KAIG3-RFI-CO-S-9036-00
KAIG3-RFI-CO-SU-2941 00 KAIG3-RFI-CO-SU-2941-00
KAIG3-RFI-CO-C-7390 00 KAIG3-RFI-CO-C-7390-00
KAIG3-RFI-MC-C-7389 00 KAIG3-RFI-MC-C-7389-00
KAIG3-RFI-CO-SU-2940 00 KAIG3-RFI-CO-SU-2940-00
KAIG3-RFI-CO-SU-2936 00 KAIG3-RFI-CO-SU-2936-00
KAIG3-RFI-LM-SU-2938 00 KAIG3-RFI-LM-SU-2938-00
KAIG3-RFI-CO-S-9039 00 KAIG3-RFI-CO-S-9039-00
KAIG3-RFI-CO-S-9037 00 KAIG3-RFI-CO-S-9037-00
KAIG3-RFI-CO-S-9038 00 KAIG3-RFI-CO-S-9038-00
KAIG3-RFI-CO-S-9011 00 KAIG3-RFI-CO-S-9011-00
KAIG3-RFI-CO-S-9040 00 KAIG3-RFI-CO-S-9040-00
KAIG3-RFI-MC-S-8417 00 KAIG3-RFI-MC-S-8417-00
KAIG3-RFI-MC-S-8416 00 KAIG3-RFI-MC-S-8416-00
KAIG3-RFI-CO-S-9021 00 KAIG3-RFI-CO-S-9021-00
KAIG3-RFI-CO-S-9015 00 KAIG3-RFI-CO-S-9015-00
KAIG3-RFI-CF-S-9034 00 KAIG3-RFI-CF-S-9034-00
KAIG3-RFI-CF-S-9033 00 KAIG3-RFI-CF-S-9033-00
KAIG3-RFI-CF-S-9032-00 00 KAIG3-RFI-CF-S-9032-00-00
KAIG3-RFI-VG-SU-2943 00 KAIG3-RFI-VG-SU-2943-00
KAIG3-RFI-CO-SU-2942 00 KAIG3-RFI-CO-SU-2942-00
KAIG3-RFI-EC-SU-2939 00 KAIG3-RFI-EC-SU-2939-00
KAIG3-RFI-CO-SU-2910 01 KAIG3-RFI-CO-SU-2910-01
KAIG3-RFI-CO-S-8999 00 KAIG3-RFI-CO-S-8999-00
KAIG3-RFI-MB-E-0571 00 KAIG3-RFI-MB-E-0571-00
KAIG3-RFI-SW-C-7320 00 KAIG3-RFI-SW-C-7320-00
KAIG3-RFI-MB-LC-0677 01 KAIG3-RFI-MB-LC-0677-01
KAIG3-RFI-SW-C-7319 00 KAIG3-RFI-SW-C-7319-00
KAIG3-RFI-SW-C-7140 00 KAIG3-RFI-SW-C-7140-00
KAIG3-RFI-CO-S-9052 00 KAIG3-RFI-CO-S-9052-00
KAIG3-RFI-CO-S-9051 00 KAIG3-RFI-CO-S-9051-00
KAIG3-RFI-CO-S-9048 00 KAIG3-RFI-CO-S-9048-00
KAIG3-RFI-CO-S-9055 00 KAIG3-RFI-CO-S-9055-00
KAIG3-RFI-CO-A-1023 00 KAIG3-RFI-CO-A-1023-00
KAIG3-RFI-CO-S-9014 00 KAIG3-RFI-CO-S-9014-00
KAIG3-RFI-CO-S-9013 00 KAIG3-RFI-CO-S-9013-00
KAIG3-RFI-CO-S-9026 00 KAIG3-RFI-CO-S-9026-00
KAIG3-RFI-EC-S-9021 00 KAIG3-RFI-EC-S-9021-00
KAIG3-RFI-EC-S-9022 00 KAIG3-RFI-EC-S-9022-00
KAIG3-RFI-MC-S-9016 00 KAIG3-RFI-MC-S-9016-00
KAIG3-RFI-EC-S-9019 00 KAIG3-RFI-EC-S-9019-00
KAIG3-RFI-CO-S-9020 00 KAIG3-RFI-CO-S-9020-00
KAIG3-RFI-CO-S-9004 00 KAIG3-RFI-CO-S-9004-00
KAIG3-RFI-CO-S-9003 00 KAIG3-RFI-CO-S-9003-00
KAIG3-RFI-CO-S-8997 00 KAIG3-RFI-CO-S-8997-00
KAIG3-RFI-WG-S-9023 00 KAIG3-RFI-WG-S-9023-00
KAIG3-RFI-CO-S-8998 00 KAIG3-RFI-CO-S-8998-00
KAIG3-RFI-PG-S-9024 00 KAIG3-RFI-PG-S-9024-00
KAIG3-RFI-CO-S-8996 00 KAIG3-RFI-CO-S-8996-00
KAIG3-RFI-WG-C-7388 00 KAIG3-RFI-WG-C-7388-00
KAIG3-RFI-LM-P-0296 00 KAIG3-RFI-LM-P-0296-00
KAIG3-RFI-WG-S-9017 00 KAIG3-RFI-WG-S-9017-00
KAIG3-RFI-WG-S-9018 00 KAIG3-RFI-WG-S-9018-00
KAIG3-RFI-WG-C-7358 00 KAIG3-RFI-WG-C-7358-00
KAIG3-RFI-WG-C-7356 00 KAIG3-RFI-WG-C-7356-00
KAIG3-RFI-WG-LS-1511 00 KAIG3-RFI-WG-LS-1511-00
KAIG3-RFI-WG-LS-1508 00 KAIG3-RFI-WG-LS-1508-00
KAIG3-RFI-TB-SS-0419 00 KAIG3-RFI-TB-SS-0419-00
KAIG3-RFI-WG-C-7336 00 KAIG3-RFI-WG-C-7336-00
KAIG3-RFI-WG-LS-1506 00 KAIG3-RFI-WG-LS-1506-00
KAIG3-RFI-WG-S-8978 00 KAIG3-RFI-WG-S-8978-00
KAIG3-RFI-SW-C-7339 00 KAIG3-RFI-SW-C-7339-00
KAIG3-RFI-TB-SU-2929 00 KAIG3-RFI-TB-SU-2929-00
KAIG3-RFI-PT-E-0512 01 KAIG3-RFI-PT-E-0512-01
KAIG3-RFI-TB-E-0572 00 KAIG3-RFI-TB-E-0572-00
KAIG3-RFI-PT-LC-0783 00 KAIG3-RFI-PT-LC-0783-00
KAIG3-RFI-PT-LC-0702 01 KAIG3-RFI-PT-LC-0702-01
KAIG3-RFI-TB-LC-0782 00 KAIG3-RFI-TB-LC-0782-00
KAIG3-RFI-PC-LC-0781 00 KAIG3-RFI-PC-LC-0781-00
KAIG3-RFI-MB-LC-0774 00 KAIG3-RFI-MB-LC-0774-00
KAIG3-RFI-WG-C-7344 00 KAIG3-RFI-WG-C-7344-00
KAIG3-RFI-WG-S-8971 00 KAIG3-RFI-WG-S-8971-00
KAIG3-RFI-PG-S-8961 00 KAIG3-RFI-PG-S-8961-00
KAIG3-RFI-PG-SU-2928 00 KAIG3-RFI-PG-SU-2928-00
KAIG3-RFI-WG-C-7337 00 KAIG3-RFI-WG-C-7337-00
KAIG3-RFI-WG-C-7338 00 KAIG3-RFI-WG-C-7338-00
KAIG3-RFI-WG-LS-1507 00 KAIG3-RFI-WG-LS-1507-00
KAIG3-RFI-WG-LS-1505 00 KAIG3-RFI-WG-LS-1505-00
KAIG3-RFI-WG-S-8979 00 KAIG3-RFI-WG-S-8979-00
KAIG3-RFI-SW-C-7310 00 KAIG3-RFI-SW-C-7310-00
KAIG3-RFI-PG-C-7313 00 KAIG3-RFI-PG-C-7313-00
KAIG3-RFI-PG-S-8525 01 KAIG3-RFI-PG-S-8525-01
KAIG3-RFI-PG-S-8937 00 KAIG3-RFI-PG-S-8937-00
KAIG3-RFI-WG-LS-1501 00 KAIG3-RFI-WG-LS-1501-00
KAIG3-RFI-WG-LS-1502 00 KAIG3-RFI-WG-LS-1502-00
KAIG3-RFI-ZG-C-7331 00 KAIG3-RFI-ZG-C-7331-00
KAIG3-RFI-WG-LS-1503 00 KAIG3-RFI-WG-LS-1503-00
KAIG3-RFI-SW-M-0295 00 KAIG3-RFI-SW-M-0295-00
KAIG3-RFI-SW-M-0294 00 KAIG3-RFI-SW-M-0294-00
KAIG3-RFI-TG-C-7321 00 KAIG3-RFI-TG-C-7321-00
KAIG3-RFI-CO-M-0293 00 KAIG3-RFI-CO-M-0293-00
KAIG3-RFI-WG-LS-1494 00 KAIG3-RFI-WG-LS-1494-00
KAIG3-RFI-DG-LS-1498 00 KAIG3-RFI-DG-LS-1498-00
KAIG3-RFI-WG-C-7311 00 KAIG3-RFI-WG-C-7311-00
KAIG3-RFI-EC-S-9020 00 KAIG3-RFI-EC-S-9020-00
KAIG3-RFI-CO-S-9001 00 KAIG3-RFI-CO-S-9001-00
KAIG3-RFI-SW-LC-0769 01 KAIG3-RFI-SW-LC-0769-01
KAIG3-RFI-CO-S-8880 01 KAIG3-RFI-CO-S-8880-01
KAIG3-RFI-LM-S-9010 00 KAIG3-RFI-LM-S-9010-00
KAIG3-RFI-CO-C-7387 00 KAIG3-RFI-CO-C-7387-00
KAIG3-RFI-CO-S-8992 00 KAIG3-RFI-CO-S-8992-00
KAIG3-RFI-CO-C-7347 00 KAIG3-RFI-CO-C-7347-00
KAIG3-RFI-MC-C-7343 00 KAIG3-RFI-MC-C-7343-00
KAIG3-RFI-CO-SU-2937 00 KAIG3-RFI-CO-SU-2937-00
KAIG3-RFI-CO-S-8990 00 KAIG3-RFI-CO-S-8990-00
KAIG3-RFI-CO-S-8991 00 KAIG3-RFI-CO-S-8991-00
KAIG3-RFI-SW-LS-1513 00 KAIG3-RFI-SW-LS-1513-00
KAIG3-RFI-SW-LS-1512 00 KAIG3-RFI-SW-LS-1512-00
KAIG3-RFI-CO-S-8419 00 KAIG3-RFI-CO-S-8419-00
KAIG3-RFI-WG-S-8910 00 KAIG3-RFI-WG-S-8910-00
KAIG3-RFI-TB-S-8911 00 KAIG3-RFI-TB-S-8911-00
KAIG3-RFI-SW-C-7261 00 KAIG3-RFI-SW-C-7261-00
KAIG3-RFI-CO-SS-0415 00 KAIG3-RFI-CO-SS-0415-00
KAIG3-RFI-WG-E-0567 00 KAIG3-RFI-WG-E-0567-00
KAIG3-RFI-WG-LC-0778 00 KAIG3-RFI-WG-LC-0778-00
KAIG3-RFI-CO-S-8864 00 KAIG3-RFI-CO-S-8864-00
KAIG3-RFI-CO-S-8912 00 KAIG3-RFI-CO-S-8912-00
KAIG3-RFI-CO-S-8689 01 KAIG3-RFI-CO-S-8689-01
KAIG3-RFI-CO-A-1022 00 KAIG3-RFI-CO-A-1022-00
KAIG3-RFI-CO-A-1019 00 KAIG3-RFI-CO-A-1019-00
KAIG3-RFI-MC-S-8917 00 KAIG3-RFI-MC-S-8917-00
KAIG3-RFI-CO-C-7342 00 KAIG3-RFI-CO-C-7342-00
KAIG3-RFI-CO-C-7346 00 KAIG3-RFI-CO-C-7346-00
KAIG3-RFI-CO-A-1021 00 KAIG3-RFI-CO-A-1021-00
KAIG3-RFI-CO-A-1020 00 KAIG3-RFI-CO-A-1020-00
KAIG3-RFI-CO-S-8989 00 KAIG3-RFI-CO-S-8989-00
KAIG3-RFI-CO-S-8988 00 KAIG3-RFI-CO-S-8988-00
KAIG3-RFI-SW-M-0292 00 KAIG3-RFI-SW-M-0292-00
KAIG3-RFI-MC-S-8981 00 KAIG3-RFI-MC-S-8981-00
KAIG3-RFI-PC-P-0288 00 KAIG3-RFI-PC-P-0288-00
KAIG3-RFI-LM-S-8980 00 KAIG3-RFI-LM-S-8980-00
KAIG3-RFI-CO-SS-0420 00 KAIG3-RFI-CO-SS-0420-00
KAIG3-RFI-MC-S-8982 00 KAIG3-RFI-MC-S-8982-00
KAIG3-RFI-MC-SU-2931 00 KAIG3-RFI-MC-SU-2931-00
KAIG3-RFI-CO-SU-2934 00 KAIG3-RFI-CO-SU-2934-00
KAIG3-RFI-CO-SU-2932 00 KAIG3-RFI-CO-SU-2932-00
KAIG3-RFI-CO-SU-2927 00 KAIG3-RFI-CO-SU-2927-00
KAIG3-RFI-MC-S-8983 00 KAIG3-RFI-MC-S-8983-00
KAIG3-RFI-CO-S-8965 00 KAIG3-RFI-CO-S-8965-00
KAIG3-RFI-CO-S-8966 00 KAIG3-RFI-CO-S-8966-00
KAIG3-RFI-CO-S-8967 00 KAIG3-RFI-CO-S-8967-00
KAIG3-RFI-PC-S-8984 00 KAIG3-RFI-PC-S-8984-00
KAIG3-RFI-CO-S-8986 00 KAIG3-RFI-CO-S-8986-00
KAIG3-RFI-CO-S-8985 00 KAIG3-RFI-CO-S-8985-00
KAIG3-RFI-MC-S-8968 00 KAIG3-RFI-MC-S-8968-00
KAIG3-RFI-MC-S-8969 00 KAIG3-RFI-MC-S-8969-00
KAIG3-RFI-MC-S-8970 00 KAIG3-RFI-MC-S-8970-00
KAIG3-RFI-MC-S-8972 00 KAIG3-RFI-MC-S-8972-00
KAIG3-RFI-MC-S-8973 00 KAIG3-RFI-MC-S-8973-00
KAIG3-RFI-MC-S-8974 00 KAIG3-RFI-MC-S-8974-00
KAIG3-RFI-EC-S-8957 00 KAIG3-RFI-EC-S-8957-00
KAIG3-RFI-VG-S-8954 00 KAIG3-RFI-VG-S-8954-00
KAIG3-RFI-VG-S-8955 00 KAIG3-RFI-VG-S-8955-00
KAIG3-RFI-SW-LS-1504 00 KAIG3-RFI-SW-LS-1504-00
KAIG3-RFI-SW-C-7326 00 KAIG3-RFI-SW-C-7326-00
KAIG3-RFI-SW-C-7325 00 KAIG3-RFI-SW-C-7325-00
KAIG3-RFI-SW-C-7324 00 KAIG3-RFI-SW-C-7324-00
KAIG3-RFI-CF-S-8964 00 KAIG3-RFI-CF-S-8964-00
KAIG3-RFI-CF-S-8963 00 KAIG3-RFI-CF-S-8963-00
KAIG3-RFI-CF-S-8962 00 KAIG3-RFI-CF-S-8962-00
KAIG3-RFI-PC-E-0570 00 KAIG3-RFI-PC-E-0570-00
KAIG3-RFI-SM-E-0569 00 KAIG3-RFI-SM-E-0569-00
KAIG3-RFI-WG-C-7262 00 KAIG3-RFI-WG-C-7262-00
KAIG3-RFI-TB-S-8905 00 KAIG3-RFI-TB-S-8905-00
KAIG3-RFI-WG-SU-2915 00 KAIG3-RFI-WG-SU-2915-00
KAIG3-RFI-SW-LS-1497 00 KAIG3-RFI-SW-LS-1497-00
KAIG3-RFI-SW-LS-1496 00 KAIG3-RFI-SW-LS-1496-00
KAIG3-RFI-SW-LS-1495 00 KAIG3-RFI-SW-LS-1495-00
KAIG3-RFI-SW-C-7323 00 KAIG3-RFI-SW-C-7323-00
KAIG3-RFI-SW-C-7322 00 KAIG3-RFI-SW-C-7322-00
KAIG3-RFI-SW-C-7318 00 KAIG3-RFI-SW-C-7318-00
KAIG3-RFI-TB-S-8904 00 KAIG3-RFI-TB-S-8904-00
KAIG3-RFI-TG-LS-1491 00 KAIG3-RFI-TG-LS-1491-00
KAIG3-RFI-TG-LS-1492 00 KAIG3-RFI-TG-LS-1492-00
KAIG3-RFI-SW-C-7317 00 KAIG3-RFI-SW-C-7317-00
KAIG3-RFI-TG-C-7296 00 KAIG3-RFI-TG-C-7296-00
KAIG3-RFI-SW-C-7316 00 KAIG3-RFI-SW-C-7316-00
KAIG3-RFI-SW-C-7315 00 KAIG3-RFI-SW-C-7315-00
KAIG3-RFI-SW-C-7314 00 KAIG3-RFI-SW-C-7314-00
KAIG3-RFI-SW-C-7309 00 KAIG3-RFI-SW-C-7309-00
KAIG3-RFI-SW-C-7308 00 KAIG3-RFI-SW-C-7308-00
KAIG3-RFI-SW-C-7307 00 KAIG3-RFI-SW-C-7307-00
KAIG3-RFI-SW-C-7306 00 KAIG3-RFI-SW-C-7306-00
KAIG3-RFI-WG-C-7281 00 KAIG3-RFI-WG-C-7281-00
KAIG3-RFI-SW-C-7305 00 KAIG3-RFI-SW-C-7305-00
KAIG3-RFI-SW-C-7304 00 KAIG3-RFI-SW-C-7304-00
KAIG3-RFI-SW-C-7303 00 KAIG3-RFI-SW-C-7303-00
KAIG3-RFI-SW-C-7302 00 KAIG3-RFI-SW-C-7302-00
KAIG3-RFI-SW-C-7301 00 KAIG3-RFI-SW-C-7301-00
KAIG3-RFI-SW-C-7295 00 KAIG3-RFI-SW-C-7295-00
KAIG3-RFI-ZG-C-7280 00 KAIG3-RFI-ZG-C-7280-00
KAIG3-RFI-SW-C-7294 00 KAIG3-RFI-SW-C-7294-00
KAIG3-RFI-SW-C-7293 00 KAIG3-RFI-SW-C-7293-00
KAIG3-RFI-SW-C-7292 00 KAIG3-RFI-SW-C-7292-00
KAIG3-RFI-SW-C-7291 00 KAIG3-RFI-SW-C-7291-00
KAIG3-RFI-SW-C-7289 00 KAIG3-RFI-SW-C-7289-00
KAIG3-RFI-WG-S-8896 00 KAIG3-RFI-WG-S-8896-00
KAIG3-RFI-SW-C-7288 00 KAIG3-RFI-SW-C-7288-00
KAIG3-RFI-WG-S-8893 00 KAIG3-RFI-WG-S-8893-00
KAIG3-RFI-SW-C-7284 00 KAIG3-RFI-SW-C-7284-00
KAIG3-RFI-RD-C-7290 00 KAIG3-RFI-RD-C-7290-00
KAIG3-RFI-PG-S-8892 00 KAIG3-RFI-PG-S-8892-00
KAIG3-RFI-WG-C-7256 00 KAIG3-RFI-WG-C-7256-00
KAIG3-RFI-WG-C-7255 00 KAIG3-RFI-WG-C-7255-00
KAIG3-RFI-WG-C-7242 00 KAIG3-RFI-WG-C-7242-00
KAIG3-RFI-SW-LS-1448 00 KAIG3-RFI-SW-LS-1448-00
KAIG3-RFI-CO-C-7334 00 KAIG3-RFI-CO-C-7334-00
KAIG3-RFI-MC-C-7333 00 KAIG3-RFI-MC-C-7333-00
KAIG3-RFI-CF-C-7332 00 KAIG3-RFI-CF-C-7332-00
KAIG3-RFI-MC-C-7335 00 KAIG3-RFI-MC-C-7335-00
KAIG3-RFI-VG-S-8924 00 KAIG3-RFI-VG-S-8924-00
KAIG3-RFI-VG-S-8925 00 KAIG3-RFI-VG-S-8925-00
KAIG3-RFI-VG-S-8926 00 KAIG3-RFI-VG-S-8926-00
KAIG3-RFI-CO-S-8927 00 KAIG3-RFI-CO-S-8927-00
KAIG3-RFI-EC-S-8938 00 KAIG3-RFI-EC-S-8938-00
KAIG3-RFI-EC-S-8939 00 KAIG3-RFI-EC-S-8939-00
KAIG3-RFI-CO-A-1014 00 KAIG3-RFI-CO-A-1014-00
KAIG3-RFI-CF-S-8936 00 KAIG3-RFI-CF-S-8936-00
KAIG3-RFI-CO-S-8953 00 KAIG3-RFI-CO-S-8953-00
KAIG3-RFI-SW-LS-1500 00 KAIG3-RFI-SW-LS-1500-00
KAIG3-RFI-CF-S-8934 00 KAIG3-RFI-CF-S-8934-00
KAIG3-RFI-SW-LS-1499 00 KAIG3-RFI-SW-LS-1499-00
KAIG3-RFI-CO-S-8933 00 KAIG3-RFI-CO-S-8933-00
KAIG3-RFI-CO-S-8932 00 KAIG3-RFI-CO-S-8932-00
KAIG3-RFI-CO-S-8944 00 KAIG3-RFI-CO-S-8944-00
KAIG3-RFI-CO-S-8919 00 KAIG3-RFI-CO-S-8919-00
KAIG3-RFI-CO-S-8945 00 KAIG3-RFI-CO-S-8945-00
KAIG3-RFI-CO-S-8930 00 KAIG3-RFI-CO-S-8930-00
KAIG3-RFI-CO-SU-2923 00 KAIG3-RFI-CO-SU-2923-00
KAIG3-RFI-CO-S-8931 00 KAIG3-RFI-CO-S-8931-00
KAIG3-RFI-CO-S-8946 00 KAIG3-RFI-CO-S-8946-00
KAIG3-RFI-CO-S-8929 00 KAIG3-RFI-CO-S-8929-00
KAIG3-RFI-CO-S-8947 00 KAIG3-RFI-CO-S-8947-00
KAIG3-RFI-EC-S-8940 00 KAIG3-RFI-EC-S-8940-00
KAIG3-RFI-EC-SU-2922 00 KAIG3-RFI-EC-SU-2922-00
KAIG3-RFI-CO-SU-2924 00 KAIG3-RFI-CO-SU-2924-00
KAIG3-RFI-CO-S-8951 00 KAIG3-RFI-CO-S-8951-00
KAIG3-RFI-CO-S-8948 00 KAIG3-RFI-CO-S-8948-00
KAIG3-RFI-CO-S-8952 00 KAIG3-RFI-CO-S-8952-00
KAIG3-RFI-CO-S-8949 00 KAIG3-RFI-CO-S-8949-00
KAIG3-RFI-MC-S-8950 00 KAIG3-RFI-MC-S-8950-00
KAIG3-RFI-CO-SS-0418 00 KAIG3-RFI-CO-SS-0418-00
KAIG3-RFI-CO-S-8921 00 KAIG3-RFI-CO-S-8921-00
KAIG3-RFI-CO-SU-2920 00 KAIG3-RFI-CO-SU-2920-00
KAIG3-RFI-CO-S-8920 00 KAIG3-RFI-CO-S-8920-00
KAIG3-RFI-CF-C-7300 00 KAIG3-RFI-CF-C-7300-00
KAIG3-RFI-CO-S-8909 00 KAIG3-RFI-CO-S-8909-00
KAIG3-RFI-VG-S-8902 00 KAIG3-RFI-VG-S-8902-00
KAIG3-RFI-JG-SU-2925 00 KAIG3-RFI-JG-SU-2925-00
KAIG3-RFI-VG-S-8903 00 KAIG3-RFI-VG-S-8903-00
KAIG3-RFI-MC-SU-2919 00 KAIG3-RFI-MC-SU-2919-00
KAIG3-RFI-MC-S-8916 00 KAIG3-RFI-MC-S-8916-00
KAIG3-RFI-CO-S-8787 00 KAIG3-RFI-CO-S-8787-00
KAIG3-RFI-CF-S-8511 00 KAIG3-RFI-CF-S-8511-00
KAIG3-RFI-TB-E-0564 00 KAIG3-RFI-TB-E-0564-00
KAIG3-RFI-CO-SU-2892 00 KAIG3-RFI-CO-SU-2892-00
KAIG3-RFI-CO-S-8914 00 KAIG3-RFI-CO-S-8914-00
KAIG3-RFI-CO-S-8640 00 KAIG3-RFI-CO-S-8640-00
KAIG3-RFI-CO-SU-2918 00 KAIG3-RFI-CO-SU-2918-00
KAIG3-RFI-CO-S-8788 00 KAIG3-RFI-CO-S-8788-00
KAIG3-RFI-CO-S-8908 00 KAIG3-RFI-CO-S-8908-00
KAIG3-RFI-CO-C-7253 00 KAIG3-RFI-CO-C-7253-00
KAIG3-RFI-TB-LC-0779 00 KAIG3-RFI-TB-LC-0779-00
KAIG3-RFI-CF-C-7252 00 KAIG3-RFI-CF-C-7252-00
KAIG3-RFI-CO-SU-2916 00 KAIG3-RFI-CO-SU-2916-00
KAIG3-RFI-MC-C-7254 00 KAIG3-RFI-MC-C-7254-00
KAIG3-RFI-TB-LC-0773 00 KAIG3-RFI-TB-LC-0773-00
KAIG3-RFI-MC-SU-2914 00 KAIG3-RFI-MC-SU-2914-00
KAIG3-RFI-TB-LC-0772 00 KAIG3-RFI-TB-LC-0772-00
KAIG3-RFI-TB-LC-0771 00 KAIG3-RFI-TB-LC-0771-00
KAIG3-RFI-CO-S-8891 00 KAIG3-RFI-CO-S-8891-00
KAIG3-RFI-EC-S-8897 00 KAIG3-RFI-EC-S-8897-00
KAIG3-RFI-CO-S-8898 00 KAIG3-RFI-CO-S-8898-00
KAIG3-RFI-MC-S-8884 00 KAIG3-RFI-MC-S-8884-00
KAIG3-RFI-MC-S-8885 00 KAIG3-RFI-MC-S-8885-00
KAIG3-RFI-MC-S-8886 00 KAIG3-RFI-MC-S-8886-00
KAIG3-RFI-CO-S-8890 00 KAIG3-RFI-CO-S-8890-00
KAIG3-RFI-CO-SS-0414 00 KAIG3-RFI-CO-SS-0414-00
KAIG3-RFI-CO-S-8789 00 KAIG3-RFI-CO-S-8789-00
KAIG3-RFI-MB-SS-0410 00 KAIG3-RFI-MB-SS-0410-00
KAIG3-RFI-SW-C-7180 00 KAIG3-RFI-SW-C-7180-00
KAIG3-RFI-CO-A-1013 00 KAIG3-RFI-CO-A-1013-00
KAIG3-RFI-CO-A-1012 00 KAIG3-RFI-CO-A-1012-00
KAIG3-RFI-CO-A-1011 00 KAIG3-RFI-CO-A-1011-00
KAIG3-RFI-CO-A-1010 00 KAIG3-RFI-CO-A-1010-00
KAIG3-RFI-CO-A-1009 00 KAIG3-RFI-CO-A-1009-00
KAIG3-RFI-SW-C-7287 00 KAIG3-RFI-SW-C-7287-00
KAIG3-RFI-SW-C-7286 00 KAIG3-RFI-SW-C-7286-00
KAIG3-RFI-SW-C-7285 00 KAIG3-RFI-SW-C-7285-00
KAIG3-RFI-SW-C-7283 00 KAIG3-RFI-SW-C-7283-00
KAIG3-RFI-SW-C-7282 00 KAIG3-RFI-SW-C-7282-00
KAIG3-RFI-SW-C-7277 00 KAIG3-RFI-SW-C-7277-00
KAIG3-RFI-SW-C-7276 00 KAIG3-RFI-SW-C-7276-00
KAIG3-RFI-SW-C-7275 00 KAIG3-RFI-SW-C-7275-00
KAIG3-RFI-SW-C-7274 00 KAIG3-RFI-SW-C-7274-00
KAIG3-RFI-SW-C-7273 00 KAIG3-RFI-SW-C-7273-00
KAIG3-RFI-SW-C-7272 00 KAIG3-RFI-SW-C-7272-00
KAIG3-RFI-SW-C-7271 00 KAIG3-RFI-SW-C-7271-00
KAIG3-RFI-SW-C-7270 00 KAIG3-RFI-SW-C-7270-00
KAIG3-RFI-SW-C-7269 00 KAIG3-RFI-SW-C-7269-00
KAIG3-RFI-SW-C-7268 00 KAIG3-RFI-SW-C-7268-00
KAIG3-RFI-SW-C-7267 00 KAIG3-RFI-SW-C-7267-00
KAIG3-RFI-SW-C-7266 00 KAIG3-RFI-SW-C-7266-00
KAIG3-RFI-SW-C-7265 00 KAIG3-RFI-SW-C-7265-00
KAIG3-RFI-SW-C-7264 00 KAIG3-RFI-SW-C-7264-00
KAIG3-RFI-SW-C-7263 00 KAIG3-RFI-SW-C-7263-00
KAIG3-RFI-SW-C-7260 00 KAIG3-RFI-SW-C-7260-00
KAIG3-RFI-PA-C-7259 00 KAIG3-RFI-PA-C-7259-00
KAIG3-RFI-SM-S-8913 00 KAIG3-RFI-SM-S-8913-00
KAIG3-RFI-CO-S-8900 00 KAIG3-RFI-CO-S-8900-00
KAIG3-RFI-CO-S-8901 00 KAIG3-RFI-CO-S-8901-00
KAIG3-RFI-CO-S-7972 01 KAIG3-RFI-CO-S-7972-01
KAIG3-RFI-CF-C-7299 00 KAIG3-RFI-CF-C-7299-00
KAIG3-RFI-CF-C-7297 00 KAIG3-RFI-CF-C-7297-00
KAIG3-RFI-CO-C-7279 00 KAIG3-RFI-CO-C-7279-00
KAIG3-RFI-VG-SU-2917 00 KAIG3-RFI-VG-SU-2917-00
KAIG3-RFI-SW-LS-1488 00 KAIG3-RFI-SW-LS-1488-00
KAIG3-RFI-EC-S-8907 00 KAIG3-RFI-EC-S-8907-00
KAIG3-RFI-EC-S-8906 00 KAIG3-RFI-EC-S-8906-00
KAIG3-RFI-SW-LS-1493 00 KAIG3-RFI-SW-LS-1493-00
KAIG3-RFI-SW-LS-1490 00 KAIG3-RFI-SW-LS-1490-00
KAIG3-RFI-SW-M-0291 00 KAIG3-RFI-SW-M-0291-00
KAIG3-RFI-SW-M-0290 00 KAIG3-RFI-SW-M-0290-00
KAIG3-RFI-PG-P-0289 00 KAIG3-RFI-PG-P-0289-00
KAIG3-RFI-PC-LC-0777 00 KAIG3-RFI-PC-LC-0777-00
KAIG3-RFI-PC-LC-0776 00 KAIG3-RFI-PC-LC-0776-00
KAIG3-RFI-PC-LC-0775 00 KAIG3-RFI-PC-LC-0775-00
KAIG3-RFI-PC-E-0566 00 KAIG3-RFI-PC-E-0566-00
KAIG3-RFI-MB-E-0565 00 KAIG3-RFI-MB-E-0565-00
KAIG3-RFI-SW-LS-1489 00 KAIG3-RFI-SW-LS-1489-00
KAIG3-RFI-PA-C-7250 00 KAIG3-RFI-PA-C-7250-00
KAIG3-RFI-SW-C-7258 00 KAIG3-RFI-SW-C-7258-00
KAIG3-RFI-SW-C-7257 00 KAIG3-RFI-SW-C-7257-00
KAIG3-RFI-SW-C-7249 00 KAIG3-RFI-SW-C-7249-00
KAIG3-RFI-SW-C-7248 00 KAIG3-RFI-SW-C-7248-00
KAIG3-RFI-SW-C-7247 00 KAIG3-RFI-SW-C-7247-00
KAIG3-RFI-SW-C-7246 00 KAIG3-RFI-SW-C-7246-00
KAIG3-RFI-SW-C-7245 00 KAIG3-RFI-SW-C-7245-00
KAIG3-RFI-SW-C-7244 00 KAIG3-RFI-SW-C-7244-00
KAIG3-RFI-SW-C-7243 00 KAIG3-RFI-SW-C-7243-00
KAIG3-RFI-TG-S-8877 00 KAIG3-RFI-TG-S-8877-00
KAIG3-RFI-TG-S-7378 01 KAIG3-RFI-TG-S-7378-01
KAIG3-RFI-TG-SU-2909 00 KAIG3-RFI-TG-SU-2909-00
KAIG3-RFI-PG-S-8873 00 KAIG3-RFI-PG-S-8873-00
KAIG3-RFI-WG-S-8597 00 KAIG3-RFI-WG-S-8597-00
KAIG3-RFI-MC-S-8842 00 KAIG3-RFI-MC-S-8842-00
KAIG3-RFI-CO-S-8879 00 KAIG3-RFI-CO-S-8879-00
KAIG3-RFI-CO-S-8880 00 KAIG3-RFI-CO-S-8880-00
KAIG3-RFI-CO-SU-2910 00 KAIG3-RFI-CO-SU-2910-00
KAIG3-RFI-CO-SU-2911 00 KAIG3-RFI-CO-SU-2911-00
KAIG3-RFI-CO-S-8881 00 KAIG3-RFI-CO-S-8881-00
KAIG3-RFI-CO-S-8882 00 KAIG3-RFI-CO-S-8882-00
KAIG3-RFI-CO-SU-2912 00 KAIG3-RFI-CO-SU-2912-00
KAIG3-RFI-CO-S-8883 00 KAIG3-RFI-CO-S-8883-00
KAIG3-RFI-CO-S-8819 00 KAIG3-RFI-CO-S-8819-00
KAIG3-RFI-SW-C-7241 00 KAIG3-RFI-SW-C-7241-00
KAIG3-RFI-SW-C-7240 00 KAIG3-RFI-SW-C-7240-00
KAIG3-RFI-SW-C-7239 00 KAIG3-RFI-SW-C-7239-00
KAIG3-RFI-SW-C-7238 00 KAIG3-RFI-SW-C-7238-00
KAIG3-RFI-SW-C-7237 00 KAIG3-RFI-SW-C-7237-00
KAIG3-RFI-SW-C-7236 00 KAIG3-RFI-SW-C-7236-00
KAIG3-RFI-SW-C-7235 00 KAIG3-RFI-SW-C-7235-00
KAIG3-RFI-SW-C-7228 00 KAIG3-RFI-SW-C-7228-00
KAIG3-RFI-SW-C-7227 00 KAIG3-RFI-SW-C-7227-00
KAIG3-RFI-SW-C-7226 00 KAIG3-RFI-SW-C-7226-00
KAIG3-RFI-SW-C-7225 00 KAIG3-RFI-SW-C-7225-00
KAIG3-RFI-SW-C-7224 00 KAIG3-RFI-SW-C-7224-00
KAIG3-RFI-SW-C-7223 00 KAIG3-RFI-SW-C-7223-00
KAIG3-RFI-SW-C-7222 00 KAIG3-RFI-SW-C-7222-00
KAIG3-RFI-SW-C-7221 00 KAIG3-RFI-SW-C-7221-00
KAIG3-RFI-SW-C-7220 00 KAIG3-RFI-SW-C-7220-00
KAIG3-RFI-SW-C-7219 00 KAIG3-RFI-SW-C-7219-00
KAIG3-RFI-SW-C-7218 00 KAIG3-RFI-SW-C-7218-00
KAIG3-RFI-SW-C-7217 00 KAIG3-RFI-SW-C-7217-00
KAIG3-RFI-SW-C-7216 00 KAIG3-RFI-SW-C-7216-00
KAIG3-RFI-SW-C-7209 00 KAIG3-RFI-SW-C-7209-00
KAIG3-RFI-SW-C-7208 00 KAIG3-RFI-SW-C-7208-00
KAIG3-RFI-SW-C-7077 01 KAIG3-RFI-SW-C-7077-01
KAIG3-RFI-SW-C-6980 01 KAIG3-RFI-SW-C-6980-01
KAIG3-RFI-SW-C-2770 01 KAIG3-RFI-SW-C-2770-01
KAIG3-RFI-SW-C-6558 00 KAIG3-RFI-SW-C-6558-00
KAIG3-RFI-CO-SS-0413 00 KAIG3-RFI-CO-SS-0413-00
KAIG3-RFI-CO-SS-0411 00 KAIG3-RFI-CO-SS-0411-00
KAIG3-RFI-CO-SS-0412 00 KAIG3-RFI-CO-SS-0412-00
KAIG3-RFI-CC-S-8671 00 KAIG3-RFI-CC-S-8671-00
KAIG3-RFI-EC-SU-2908 00 KAIG3-RFI-EC-SU-2908-00
KAIG3-RFI-CF-C-7231 00 KAIG3-RFI-CF-C-7231-00
KAIG3-RFI-MC-C-7232 00 KAIG3-RFI-MC-C-7232-00
KAIG3-RFI-CO-C-7230 00 KAIG3-RFI-CO-C-7230-00
KAIG3-RFI-CO-S-8869 00 KAIG3-RFI-CO-S-8869-00
KAIG3-RFI-CO-S-8870 00 KAIG3-RFI-CO-S-8870-00
KAIG3-RFI-EC-S-8871 00 KAIG3-RFI-EC-S-8871-00
KAIG3-RFI-EC-S-8872 00 KAIG3-RFI-EC-S-8872-00
KAIG3-RFI-CO-S-8620 00 KAIG3-RFI-CO-S-8620-00
KAIG3-RFI-CO-S-8627 00 KAIG3-RFI-CO-S-8627-00
KAIG3-RFI-CO-S-8531 00 KAIG3-RFI-CO-S-8531-00
KAIG3-RFI-MC-S-8776 00 KAIG3-RFI-MC-S-8776-00
KAIG3-RFI-CO-S-8854 00 KAIG3-RFI-CO-S-8854-00
KAIG3-RFI-CO-S-8843 00 KAIG3-RFI-CO-S-8843-00
KAIG3-RFI-CO-S-8844 00 KAIG3-RFI-CO-S-8844-00
KAIG3-RFI-PC-S-8866 00 KAIG3-RFI-PC-S-8866-00
KAIG3-RFI-PC-SU-2907 00 KAIG3-RFI-PC-SU-2907-00
KAIG3-RFI-PC-S-8867 00 KAIG3-RFI-PC-S-8867-00
KAIG3-RFI-RG-C-7229 00 KAIG3-RFI-RG-C-7229-00
KAIG3-RFI-MC-C-7234 00 KAIG3-RFI-MC-C-7234-00
KAIG3-RFI-MC-C-7233 00 KAIG3-RFI-MC-C-7233-00
KAIG3-RFI-CF-S-8876 00 KAIG3-RFI-CF-S-8876-00
KAIG3-RFI-CF-S-8875 00 KAIG3-RFI-CF-S-8875-00
KAIG3-RFI-CF-S-8874 00 KAIG3-RFI-CF-S-8874-00
KAIG3-RFI-SW-LS-1486 00 KAIG3-RFI-SW-LS-1486-00
KAIG3-RFI-SW-LS-1485 00 KAIG3-RFI-SW-LS-1485-00
KAIG3-RFI-SW-LS-1487 00 KAIG3-RFI-SW-LS-1487-00
KAIG3-RFI-PC-P-0284 01 KAIG3-RFI-PC-P-0284-01
KAIG3-RFI-SW-E-0554 01 KAIG3-RFI-SW-E-0554-01
KAIG3-RFI-EC-S-8422 01 KAIG3-RFI-EC-S-8422-01
KAIG3-RFI-CO-C-6600 00 KAIG3-RFI-CO-C-6600-00
KAIG3-RFI-WG-LC-0768 00 KAIG3-RFI-WG-LC-0768-00
KAIG3-RFI-AG-A-0390 01 KAIG3-RFI-AG-A-0390-01
KAIG3-RFI-AG-A-0390 00 KAIG3-RFI-AG-A-0390-00
KAIG3-RFI-SW-C-7186 00 KAIG3-RFI-SW-C-7186-00
KAIG3-RFI-SW-C-7179 00 KAIG3-RFI-SW-C-7179-00
KAIG3-RFI-SW-C-7178 00 KAIG3-RFI-SW-C-7178-00
KAIG3-RFI-SW-LS-1484 00 KAIG3-RFI-SW-LS-1484-00
KAIG3-RFI-SW-LS-1483 00 KAIG3-RFI-SW-LS-1483-00
KAIG3-RFI-SW-C-7215 00 KAIG3-RFI-SW-C-7215-00
KAIG3-RFI-SW-C-7214 00 KAIG3-RFI-SW-C-7214-00
KAIG3-RFI-SW-C-7213 00 KAIG3-RFI-SW-C-7213-00
KAIG3-RFI-SW-C-7212 00 KAIG3-RFI-SW-C-7212-00
KAIG3-RFI-SW-C-7211 00 KAIG3-RFI-SW-C-7211-00
KAIG3-RFI-SW-C-7207 00 KAIG3-RFI-SW-C-7207-00
KAIG3-RFI-SW-C-7206 00 KAIG3-RFI-SW-C-7206-00
KAIG3-RFI-SW-C-7205 00 KAIG3-RFI-SW-C-7205-00
KAIG3-RFI-SW-C-7204 00 KAIG3-RFI-SW-C-7204-00
KAIG3-RFI-SW-C-7203 00 KAIG3-RFI-SW-C-7203-00
KAIG3-RFI-SW-C-7202 00 KAIG3-RFI-SW-C-7202-00
KAIG3-RFI-SW-C-7201 00 KAIG3-RFI-SW-C-7201-00
KAIG3-RFI-SW-C-7190 00 KAIG3-RFI-SW-C-7190-00
KAIG3-RFI-SW-C-7189 00 KAIG3-RFI-SW-C-7189-00
KAIG3-RFI-PA-C-7188 00 KAIG3-RFI-PA-C-7188-00
KAIG3-RFI-PA-C-7187 00 KAIG3-RFI-PA-C-7187-00
KAIG3-RFI-SW-C-7086 00 KAIG3-RFI-SW-C-7086-00
KAIG3-RFI-SW-C-7085 00 KAIG3-RFI-SW-C-7085-00
KAIG3-RFI-SW-C-7084 00 KAIG3-RFI-SW-C-7084-00
KAIG3-RFI-SW-M-0287 00 KAIG3-RFI-SW-M-0287-00
KAIG3-RFI-MC-C-7198 00 KAIG3-RFI-MC-C-7198-00
KAIG3-RFI-CO-S-8865 00 KAIG3-RFI-CO-S-8865-00
KAIG3-RFI-CO-SU-2901 00 KAIG3-RFI-CO-SU-2901-00
KAIG3-RFI-CO-SU-2906 00 KAIG3-RFI-CO-SU-2906-00
KAIG3-RFI-CO-SU-2904 00 KAIG3-RFI-CO-SU-2904-00
KAIG3-RFI-CO-SU-2905 00 KAIG3-RFI-CO-SU-2905-00
KAIG3-RFI-CO-SU-2903 00 KAIG3-RFI-CO-SU-2903-00
KAIG3-RFI-MC-SU-2902 00 KAIG3-RFI-MC-SU-2902-00
KAIG3-RFI-CO-S-8861 00 KAIG3-RFI-CO-S-8861-00
KAIG3-RFI-EC-S-8747 01 KAIG3-RFI-EC-S-8747-01
KAIG3-RFI-EC-S-8746 01 KAIG3-RFI-EC-S-8746-01
KAIG3-RFI-MC-C-7199 00 KAIG3-RFI-MC-C-7199-00
KAIG3-RFI-CO-S-8863 00 KAIG3-RFI-CO-S-8863-00
KAIG3-RFI-CO-S-8855 00 KAIG3-RFI-CO-S-8855-00
KAIG3-RFI-CO-C-7195 00 KAIG3-RFI-CO-C-7195-00
KAIG3-RFI-CO-S-8856 00 KAIG3-RFI-CO-S-8856-00
KAIG3-RFI-CO-S-8857 00 KAIG3-RFI-CO-S-8857-00
KAIG3-RFI-CO-S-8858 00 KAIG3-RFI-CO-S-8858-00
KAIG3-RFI-CO-S-8859 00 KAIG3-RFI-CO-S-8859-00
KAIG3-RFI-CO-S-8853 00 KAIG3-RFI-CO-S-8853-00
KAIG3-RFI-CF-C-7200 00 KAIG3-RFI-CF-C-7200-00
KAIG3-RFI-CF-C-7197 00 KAIG3-RFI-CF-C-7197-00
KAIG3-RFI-CO-C-7196 00 KAIG3-RFI-CO-C-7196-00
KAIG3-RFI-MC-S-8850 00 KAIG3-RFI-MC-S-8850-00
KAIG3-RFI-CO-S-8329 00 KAIG3-RFI-CO-S-8329-00
KAIG3-RFI-MC-S-8851 00 KAIG3-RFI-MC-S-8851-00
KAIG3-RFI-MC-S-8852 00 KAIG3-RFI-MC-S-8852-00
KAIG3-RFI-CO-S-8846 00 KAIG3-RFI-CO-S-8846-00
KAIG3-RFI-SM-S-8781 00 KAIG3-RFI-SM-S-8781-00
KAIG3-RFI-CO-S-8845 00 KAIG3-RFI-CO-S-8845-00
KAIG3-RFI-SM-S-8780 00 KAIG3-RFI-SM-S-8780-00
KAIG3-RFI-EC-S-8829 00 KAIG3-RFI-EC-S-8829-00
KAIG3-RFI-EC-S-8830 00 KAIG3-RFI-EC-S-8830-00
KAIG3-RFI-EC-S-8831 00 KAIG3-RFI-EC-S-8831-00
KAIG3-RFI-CO-S-8821 00 KAIG3-RFI-CO-S-8821-00
KAIG3-RFI-CO-S-8822 00 KAIG3-RFI-CO-S-8822-00
KAIG3-RFI-CO-S-8816 00 KAIG3-RFI-CO-S-8816-00
KAIG3-RFI-CO-S-8836 00 KAIG3-RFI-CO-S-8836-00
KAIG3-RFI-CO-S-8817 00 KAIG3-RFI-CO-S-8817-00
KAIG3-RFI-CO-S-8818 00 KAIG3-RFI-CO-S-8818-00
KAIG3-RFI-CO-S-8847 00 KAIG3-RFI-CO-S-8847-00
KAIG3-RFI-EC-SU-2900 00 KAIG3-RFI-EC-SU-2900-00
KAIG3-RFI-CO-SU-2898 00 KAIG3-RFI-CO-SU-2898-00
KAIG3-RFI-CO-C-7191 00 KAIG3-RFI-CO-C-7191-00
KAIG3-RFI-CO-SU-2895 00 KAIG3-RFI-CO-SU-2895-00
KAIG3-RFI-CO-SU-2897 00 KAIG3-RFI-CO-SU-2897-00
KAIG3-RFI-CO-S-8811 00 KAIG3-RFI-CO-S-8811-00
KAIG3-RFI-CO-S-8812 00 KAIG3-RFI-CO-S-8812-00
KAIG3-RFI-CO-S-8813 00 KAIG3-RFI-CO-S-8813-00
KAIG3-RFI-CO-C-7192 00 KAIG3-RFI-CO-C-7192-00
KAIG3-RFI-CO-S-8815 00 KAIG3-RFI-CO-S-8815-00
KAIG3-RFI-CO-SU-2896 00 KAIG3-RFI-CO-SU-2896-00
KAIG3-RFI-SW-C-7185 00 KAIG3-RFI-SW-C-7185-00
KAIG3-RFI-SW-C-7184 00 KAIG3-RFI-SW-C-7184-00
KAIG3-RFI-SW-C-7182 00 KAIG3-RFI-SW-C-7182-00
KAIG3-RFI-SW-C-7181 00 KAIG3-RFI-SW-C-7181-00
KAIG3-RFI-CO-S-8810 00 KAIG3-RFI-CO-S-8810-00
KAIG3-RFI-SW-C-7177 00 KAIG3-RFI-SW-C-7177-00
KAIG3-RFI-SW-C-7176 00 KAIG3-RFI-SW-C-7176-00
KAIG3-RFI-CO-S-8832 00 KAIG3-RFI-CO-S-8832-00
KAIG3-RFI-CO-S-8828 00 KAIG3-RFI-CO-S-8828-00
KAIG3-RFI-SW-C-7169 00 KAIG3-RFI-SW-C-7169-00
KAIG3-RFI-CO-S-8814 00 KAIG3-RFI-CO-S-8814-00
KAIG3-RFI-CO-S-8705 00 KAIG3-RFI-CO-S-8705-00
KAIG3-RFI-SW-C-7168 00 KAIG3-RFI-SW-C-7168-00
KAIG3-RFI-SW-C-7167 00 KAIG3-RFI-SW-C-7167-00
KAIG3-RFI-CO-SS-0408 00 KAIG3-RFI-CO-SS-0408-00
KAIG3-RFI-SW-C-7166 00 KAIG3-RFI-SW-C-7166-00
KAIG3-RFI-SW-C-7165 00 KAIG3-RFI-SW-C-7165-00
KAIG3-RFI-MC-C-7194 00 KAIG3-RFI-MC-C-7194-00
KAIG3-RFI-SW-C-7160 00 KAIG3-RFI-SW-C-7160-00
KAIG3-RFI-SW-C-7158 00 KAIG3-RFI-SW-C-7158-00
KAIG3-RFI-CO-SS-0409 00 KAIG3-RFI-CO-SS-0409-00
KAIG3-RFI-CO-C-7193 00 KAIG3-RFI-CO-C-7193-00
KAIG3-RFI-SW-C-7156 00 KAIG3-RFI-SW-C-7156-00
KAIG3-RFI-SW-C-7155 00 KAIG3-RFI-SW-C-7155-00
KAIG3-RFI-SW-C-7154 00 KAIG3-RFI-SW-C-7154-00
KAIG3-RFI-SW-C-7153 00 KAIG3-RFI-SW-C-7153-00
KAIG3-RFI-CO-S-8848 00 KAIG3-RFI-CO-S-8848-00
KAIG3-RFI-SW-C-7152 00 KAIG3-RFI-SW-C-7152-00
KAIG3-RFI-CO-S-8849 00 KAIG3-RFI-CO-S-8849-00
KAIG3-RFI-SW-C-7118 00 KAIG3-RFI-SW-C-7118-00
KAIG3-RFI-SW-C-7083 00 KAIG3-RFI-SW-C-7083-00
KAIG3-RFI-CO-S-8838 00 KAIG3-RFI-CO-S-8838-00
KAIG3-RFI-SW-C-7082 00 KAIG3-RFI-SW-C-7082-00
KAIG3-RFI-CO-S-8837 00 KAIG3-RFI-CO-S-8837-00
KAIG3-RFI-SW-C-7078 00 KAIG3-RFI-SW-C-7078-00
KAIG3-RFI-PA-C-7159 00 KAIG3-RFI-PA-C-7159-00
KAIG3-RFI-SW-A-0876 01 KAIG3-RFI-SW-A-0876-01
KAIG3-RFI-WG-E-0553 00 KAIG3-RFI-WG-E-0553-00
KAIG3-RFI-SW-LS-1478 00 KAIG3-RFI-SW-LS-1478-00
KAIG3-RFI-SW-C-7123 00 KAIG3-RFI-SW-C-7123-00
KAIG3-RFI-SW-C-7120 00 KAIG3-RFI-SW-C-7120-00
KAIG3-RFI-SW-C-7119 00 KAIG3-RFI-SW-C-7119-00
KAIG3-RFI-CO-A-1008 00 KAIG3-RFI-CO-A-1008-00
KAIG3-RFI-SW-C-7117 00 KAIG3-RFI-SW-C-7117-00
KAIG3-RFI-SW-C-7116 00 KAIG3-RFI-SW-C-7116-00
KAIG3-RFI-CO-S-8800 00 KAIG3-RFI-CO-S-8800-00
KAIG3-RFI-CO-SU-2894 00 KAIG3-RFI-CO-SU-2894-00
KAIG3-RFI-SW-C-7115 00 KAIG3-RFI-SW-C-7115-00
KAIG3-RFI-SW-C-7114 00 KAIG3-RFI-SW-C-7114-00
KAIG3-RFI-SW-C-7100 00 KAIG3-RFI-SW-C-7100-00
KAIG3-RFI-SW-C-7099 00 KAIG3-RFI-SW-C-7099-00
KAIG3-RFI-SW-C-7098 00 KAIG3-RFI-SW-C-7098-00
KAIG3-RFI-CO-S-8833 00 KAIG3-RFI-CO-S-8833-00
KAIG3-RFI-CO-S-8835 00 KAIG3-RFI-CO-S-8835-00
KAIG3-RFI-SW-C-7097 00 KAIG3-RFI-SW-C-7097-00
KAIG3-RFI-SG-C-7175 00 KAIG3-RFI-SG-C-7175-00
KAIG3-RFI-CO-S-8834 00 KAIG3-RFI-CO-S-8834-00
KAIG3-RFI-SW-C-7096 00 KAIG3-RFI-SW-C-7096-00
KAIG3-RFI-SW-C-7095 00 KAIG3-RFI-SW-C-7095-00
KAIG3-RFI-SW-C-7142 00 KAIG3-RFI-SW-C-7142-00
KAIG3-RFI-CO-S-8827 00 KAIG3-RFI-CO-S-8827-00
KAIG3-RFI-SW-C-7141 00 KAIG3-RFI-SW-C-7141-00
KAIG3-RFI-PG-C-7171 00 KAIG3-RFI-PG-C-7171-00
KAIG3-RFI-CO-S-8825 00 KAIG3-RFI-CO-S-8825-00
KAIG3-RFI-SW-C-7144 00 KAIG3-RFI-SW-C-7144-00
KAIG3-RFI-SW-C-7143 00 KAIG3-RFI-SW-C-7143-00
KAIG3-RFI-CF-S-8808 00 KAIG3-RFI-CF-S-8808-00
KAIG3-RFI-SW-C-7094 00 KAIG3-RFI-SW-C-7094-00
KAIG3-RFI-SW-C-7093 00 KAIG3-RFI-SW-C-7093-00
KAIG3-RFI-WG-LS-1481-00 00 KAIG3-RFI-WG-LS-1481-00-00
KAIG3-RFI-SW-C-7092 00 KAIG3-RFI-SW-C-7092-00
KAIG3-RFI-CF-S-8807 00 KAIG3-RFI-CF-S-8807-00
KAIG3-RFI-SW-C-7091 00 KAIG3-RFI-SW-C-7091-00
KAIG3-RFI-SW-C-7080 00 KAIG3-RFI-SW-C-7080-00
KAIG3-RFI-CF-S-8806 00 KAIG3-RFI-CF-S-8806-00
KAIG3-RFI-SW-C-7079 00 KAIG3-RFI-SW-C-7079-00
KAIG3-RFI-CF-S-8803 00 KAIG3-RFI-CF-S-8803-00
KAIG3-RFI-PG-C-7170 00 KAIG3-RFI-PG-C-7170-00
KAIG3-RFI-CF-S-8805 00 KAIG3-RFI-CF-S-8805-00
KAIG3-RFI-PG-C-7174 00 KAIG3-RFI-PG-C-7174-00
KAIG3-RFI-SW-C-7077 00 KAIG3-RFI-SW-C-7077-00
KAIG3-RFI-SW-C-6714 01 KAIG3-RFI-SW-C-6714-01
KAIG3-RFI-CO-S-8826 00 KAIG3-RFI-CO-S-8826-00
KAIG3-RFI-PA-C-7070 00 KAIG3-RFI-PA-C-7070-00
KAIG3-RFI-MC-C-6599 00 KAIG3-RFI-MC-C-6599-00
KAIG3-RFI-SW-C-6931 00 KAIG3-RFI-SW-C-6931-00
KAIG3-RFI-WG-C-7122 00 KAIG3-RFI-WG-C-7122-00
KAIG3-RFI-WG-C-7146 00 KAIG3-RFI-WG-C-7146-00
KAIG3-RFI-WG-LS-1479 00 KAIG3-RFI-WG-LS-1479-00
KAIG3-RFI-AG-C-7145 00 KAIG3-RFI-AG-C-7145-00
KAIG3-RFI-CO-A-1003 00 KAIG3-RFI-CO-A-1003-00
KAIG3-RFI-CO-A-1002 00 KAIG3-RFI-CO-A-1002-00
KAIG3-RFI-CO-A-1001 00 KAIG3-RFI-CO-A-1001-00
KAIG3-RFI-CO-C-7147 00 KAIG3-RFI-CO-C-7147-00
KAIG3-RFI-PC-S-8802 00 KAIG3-RFI-PC-S-8802-00
KAIG3-RFI-CO-S-8799 00 KAIG3-RFI-CO-S-8799-00
KAIG3-RFI-EC-SU-2893 00 KAIG3-RFI-EC-SU-2893-00
KAIG3-RFI-EC-S-8793 00 KAIG3-RFI-EC-S-8793-00
KAIG3-RFI-MC-S-8786 00 KAIG3-RFI-MC-S-8786-00
KAIG3-RFI-CO-S-8756 00 KAIG3-RFI-CO-S-8756-00
KAIG3-RFI-VG-S-8734 00 KAIG3-RFI-VG-S-8734-00
KAIG3-RFI-CO-SS-0407 00 KAIG3-RFI-CO-SS-0407-00
KAIG3-RFI-CO-S-8546 00 KAIG3-RFI-CO-S-8546-00
KAIG3-RFI-CO-S-8768 00 KAIG3-RFI-CO-S-8768-00
KAIG3-RFI-CO-S-8770 00 KAIG3-RFI-CO-S-8770-00
KAIG3-RFI-CO-S-8771 00 KAIG3-RFI-CO-S-8771-00
KAIG3-RFI-CO-S-8772 00 KAIG3-RFI-CO-S-8772-00
KAIG3-RFI-CO-S-8773 00 KAIG3-RFI-CO-S-8773-00
KAIG3-RFI-CO-SU-2888 00 KAIG3-RFI-CO-SU-2888-00
KAIG3-RFI-MC-S-8774 00 KAIG3-RFI-MC-S-8774-00
KAIG3-RFI-MC-S-8775 00 KAIG3-RFI-MC-S-8775-00
KAIG3-RFI-MC-SU-2889 00 KAIG3-RFI-MC-SU-2889-00
KAIG3-RFI-EC-S-8764 00 KAIG3-RFI-EC-S-8764-00
KAIG3-RFI-CO-S-8765 00 KAIG3-RFI-CO-S-8765-00
KAIG3-RFI-CO-S-8766 00 KAIG3-RFI-CO-S-8766-00
KAIG3-RFI-CO-S-8767 00 KAIG3-RFI-CO-S-8767-00
KAIG3-RFI-MC-S-8611 00 KAIG3-RFI-MC-S-8611-00
KAIG3-RFI-CO-S-8135 00 KAIG3-RFI-CO-S-8135-00
KAIG3-RFI-CO-S-6764 00 KAIG3-RFI-CO-S-6764-00
KAIG3-RFI-CO-S-6916 00 KAIG3-RFI-CO-S-6916-00
KAIG3-RFI-CO-S-8090 00 KAIG3-RFI-CO-S-8090-00
KAIG3-RFI-CO-S-8030 00 KAIG3-RFI-CO-S-8030-00
KAIG3-RFI-CO-S-8446 00 KAIG3-RFI-CO-S-8446-00
KAIG3-RFI-CO-S-8295 00 KAIG3-RFI-CO-S-8295-00
KAIG3-RFI-CO-S-8256 00 KAIG3-RFI-CO-S-8256-00
KAIG3-RFI-PG-S-8794 00 KAIG3-RFI-PG-S-8794-00
KAIG3-RFI-WG-S-8798 00 KAIG3-RFI-WG-S-8798-00
KAIG3-RFI-AG-SS-0406 00 KAIG3-RFI-AG-SS-0406-00
KAIG3-RFI-PT-A-1006 00 KAIG3-RFI-PT-A-1006-00
KAIG3-RFI-DG-C-7101 00 KAIG3-RFI-DG-C-7101-00
KAIG3-RFI-TG-C-7112 00 KAIG3-RFI-TG-C-7112-00
KAIG3-RFI-WG-C-7111 00 KAIG3-RFI-WG-C-7111-00
KAIG3-RFI-WG-C-7110 00 KAIG3-RFI-WG-C-7110-00
KAIG3-RFI-WG-SU-2887 00 KAIG3-RFI-WG-SU-2887-00
KAIG3-RFI-SW-S-8777 00 KAIG3-RFI-SW-S-8777-00
KAIG3-RFI-SW-S-8778 00 KAIG3-RFI-SW-S-8778-00
KAIG3-RFI-SW-S-8779 00 KAIG3-RFI-SW-S-8779-00
KAIG3-RFI-TG-C-7113 00 KAIG3-RFI-TG-C-7113-00
KAIG3-RFI-TG-P-0286 00 KAIG3-RFI-TG-P-0286-00
KAIG3-RFI-TG-C-7121 00 KAIG3-RFI-TG-C-7121-00
KAIG3-RFI-MB-E-0555 00 KAIG3-RFI-MB-E-0555-00
KAIG3-RFI-WG-E-0552 00 KAIG3-RFI-WG-E-0552-00
KAIG3-RFI-SW-LS-1480 00 KAIG3-RFI-SW-LS-1480-00
KAIG3-RFI-SW-C-7151 00 KAIG3-RFI-SW-C-7151-00
KAIG3-RFI-SW-C-7150 00 KAIG3-RFI-SW-C-7150-00
KAIG3-RFI-SW-C-7149 00 KAIG3-RFI-SW-C-7149-00
KAIG3-RFI-SW-C-7148 00 KAIG3-RFI-SW-C-7148-00
KAIG3-RFI-SW-C-7139 00 KAIG3-RFI-SW-C-7139-00
KAIG3-RFI-SW-C-7138 00 KAIG3-RFI-SW-C-7138-00
KAIG3-RFI-SW-C-7137 00 KAIG3-RFI-SW-C-7137-00
KAIG3-RFI-SW-C-7136 00 KAIG3-RFI-SW-C-7136-00
KAIG3-RFI-SW-C-7135 00 KAIG3-RFI-SW-C-7135-00
KAIG3-RFI-SW-C-7134 00 KAIG3-RFI-SW-C-7134-00
KAIG3-RFI-SW-C-7133 00 KAIG3-RFI-SW-C-7133-00
KAIG3-RFI-SW-C-7132 00 KAIG3-RFI-SW-C-7132-00
KAIG3-RFI-SW-C-7131 00 KAIG3-RFI-SW-C-7131-00
KAIG3-RFI-SW-C-7130 00 KAIG3-RFI-SW-C-7130-00
KAIG3-RFI-SW-C-7129 00 KAIG3-RFI-SW-C-7129-00
KAIG3-RFI-SW-C-7128 00 KAIG3-RFI-SW-C-7128-00
KAIG3-RFI-SW-C-7126 00 KAIG3-RFI-SW-C-7126-00
KAIG3-RFI-SW-C-7125 00 KAIG3-RFI-SW-C-7125-00
KAIG3-RFI-PA-C-7127 00 KAIG3-RFI-PA-C-7127-00
KAIG3-RFI-MC-C-7163 00 KAIG3-RFI-MC-C-7163-00
KAIG3-RFI-CO-C-7162 00 KAIG3-RFI-CO-C-7162-00
KAIG3-RFI-CF-C-7161 00 KAIG3-RFI-CF-C-7161-00
KAIG3-RFI-MC-C-7164 00 KAIG3-RFI-MC-C-7164-00
KAIG3-RFI-CO-S-8796 00 KAIG3-RFI-CO-S-8796-00
KAIG3-RFI-CO-S-8795 00 KAIG3-RFI-CO-S-8795-00
KAIG3-RFI-CO-S-8797 00 KAIG3-RFI-CO-S-8797-00
KAIG3-RFI-CO-S-8792 00 KAIG3-RFI-CO-S-8792-00
KAIG3-RFI-CO-S-8791 00 KAIG3-RFI-CO-S-8791-00
KAIG3-RFI-CO-S-8790 00 KAIG3-RFI-CO-S-8790-00
KAIG3-RFI-CO-S-8261 00 KAIG3-RFI-CO-S-8261-00
KAIG3-RFI-MB-LC-0755 00 KAIG3-RFI-MB-LC-0755-00
KAIG3-RFI-SM-LC-0753 00 KAIG3-RFI-SM-LC-0753-00
KAIG3-RFI-SM-LC-0752 00 KAIG3-RFI-SM-LC-0752-00
KAIG3-RFI-SW-LC-0770 00 KAIG3-RFI-SW-LC-0770-00
KAIG3-RFI-SW-LC-0769 00 KAIG3-RFI-SW-LC-0769-00
KAIG3-RFI-MB-LC-0710 00 KAIG3-RFI-MB-LC-0710-00
KAIG3-RFI-CO-SS-0405 00 KAIG3-RFI-CO-SS-0405-00
KAIG3-RFI-WG-C-7102 00 KAIG3-RFI-WG-C-7102-00
KAIG3-RFI-PT-A-1007 00 KAIG3-RFI-PT-A-1007-00
KAIG3-RFI-SW-E-0554 00 KAIG3-RFI-SW-E-0554-00
KAIG3-RFI-SW-M-0285 00 KAIG3-RFI-SW-M-0285-00
KAIG3-RFI-CO-S-8712 00 KAIG3-RFI-CO-S-8712-00
KAIG3-RFI-SM-SU-2890 00 KAIG3-RFI-SM-SU-2890-00
KAIG3-RFI-MC-C-7105 00 KAIG3-RFI-MC-C-7105-00
KAIG3-RFI-MC-C-7106 00 KAIG3-RFI-MC-C-7106-00
KAIG3-RFI-MC-C-7109 00 KAIG3-RFI-MC-C-7109-00
KAIG3-RFI-CO-C-7104 00 KAIG3-RFI-CO-C-7104-00
KAIG3-RFI-CO-C-7107 00 KAIG3-RFI-CO-C-7107-00
KAIG3-RFI-MC-S-8650 00 KAIG3-RFI-MC-S-8650-00
KAIG3-RFI-MC-S-8651 00 KAIG3-RFI-MC-S-8651-00
KAIG3-RFI-CO-C-7108 00 KAIG3-RFI-CO-C-7108-00
KAIG3-RFI-MC-S-8652 00 KAIG3-RFI-MC-S-8652-00
KAIG3-RFI-DG-LS-1476 00 KAIG3-RFI-DG-LS-1476-00
KAIG3-RFI-WG-C-7088 00 KAIG3-RFI-WG-C-7088-00
KAIG3-RFI-PG-C-7087-00 00 KAIG3-RFI-PG-C-7087-00-00
KAIG3-RFI-WG-SU-2886 00 KAIG3-RFI-WG-SU-2886-00
KAIG3-RFI-WG-C-7071 00 KAIG3-RFI-WG-C-7071-00
KAIG3-RFI-WG-C-7072-00 00 KAIG3-RFI-WG-C-7072-00-00
KAIG3-RFI-PG-SU-2885 00 KAIG3-RFI-PG-SU-2885-00
KAIG3-RFI-SG-C-7090 00 KAIG3-RFI-SG-C-7090-00
KAIG3-RFI-DG-LS-1477 00 KAIG3-RFI-DG-LS-1477-00
KAIG3-RFI-NA-LC-0767 00 KAIG3-RFI-NA-LC-0767-00
KAIG3-RFI-SW-LC-0763 00 KAIG3-RFI-SW-LC-0763-00
KAIG3-RFI-SW-LC-0764 00 KAIG3-RFI-SW-LC-0764-00
KAIG3-RFI-SW-C-4856 01 KAIG3-RFI-SW-C-4856-01
KAIG3-RFI-PC-P-0256 01 KAIG3-RFI-PC-P-0256-01
KAIG3-RFI-PC-LC-0766 00 KAIG3-RFI-PC-LC-0766-00
KAIG3-RFI-PC-LC-0765 00 KAIG3-RFI-PC-LC-0765-00
KAIG3-RFI-SW-E-0551 00 KAIG3-RFI-SW-E-0551-00
KAIG3-RFI-SW-E-0550 00 KAIG3-RFI-SW-E-0550-00
KAIG3-RFI-SW-E-0549 00 KAIG3-RFI-SW-E-0549-00
KAIG3-RFI-DG-C-6949 01 KAIG3-RFI-DG-C-6949-01
KAIG3-RFI-DG-C-6948 01 KAIG3-RFI-DG-C-6948-01
KAIG3-RFI-DG-C-6947 01 KAIG3-RFI-DG-C-6947-01
KAIG3-RFI-SW-S-8744 00 KAIG3-RFI-SW-S-8744-00
KAIG3-RFI-AG-A-1004 00 KAIG3-RFI-AG-A-1004-00
KAIG3-RFI-EC-S-8747 00 KAIG3-RFI-EC-S-8747-00
KAIG3-RFI-EC-S-8746 00 KAIG3-RFI-EC-S-8746-00
KAIG3-RFI-EC-S-8745 00 KAIG3-RFI-EC-S-8745-00
KAIG3-RFI-EC-S-8568 01 KAIG3-RFI-EC-S-8568-01
KAIG3-RFI-EC-S-8743 00 KAIG3-RFI-EC-S-8743-00
KAIG3-RFI-EC-S-8742 00 KAIG3-RFI-EC-S-8742-00
KAIG3-RFI-WG-LS-1474 00 KAIG3-RFI-WG-LS-1474-00
KAIG3-RFI-WG-LS-1475 00 KAIG3-RFI-WG-LS-1475-00
KAIG3-RFI-SW-C-7081 00 KAIG3-RFI-SW-C-7081-00
KAIG3-RFI-SW-C-7076 00 KAIG3-RFI-SW-C-7076-00
KAIG3-RFI-SW-C-7075 00 KAIG3-RFI-SW-C-7075-00
KAIG3-RFI-SW-C-7069 00 KAIG3-RFI-SW-C-7069-00
KAIG3-RFI-SW-C-7068 00 KAIG3-RFI-SW-C-7068-00
KAIG3-RFI-SW-C-7067 00 KAIG3-RFI-SW-C-7067-00
KAIG3-RFI-SW-C-7066 00 KAIG3-RFI-SW-C-7066-00
KAIG3-RFI-SW-C-7063 00 KAIG3-RFI-SW-C-7063-00
KAIG3-RFI-SW-C-7062 00 KAIG3-RFI-SW-C-7062-00
KAIG3-RFI-SW-C-7061 00 KAIG3-RFI-SW-C-7061-00
KAIG3-RFI-SW-C-7060 00 KAIG3-RFI-SW-C-7060-00
KAIG3-RFI-CO-S-8757 00 KAIG3-RFI-CO-S-8757-00
KAIG3-RFI-CO-S-8762 00 KAIG3-RFI-CO-S-8762-00
KAIG3-RFI-MC-S-8763 00 KAIG3-RFI-MC-S-8763-00
KAIG3-RFI-CO-S-8750 00 KAIG3-RFI-CO-S-8750-00
KAIG3-RFI-CO-S-8704 00 KAIG3-RFI-CO-S-8704-00
KAIG3-RFI-VG-S-8733 00 KAIG3-RFI-VG-S-8733-00
KAIG3-RFI-VG-S-8732 00 KAIG3-RFI-VG-S-8732-00
KAIG3-RFI-CO-S-8738 00 KAIG3-RFI-CO-S-8738-00
KAIG3-RFI-CO-S-8739 00 KAIG3-RFI-CO-S-8739-00
KAIG3-RFI-CO-S-8741 00 KAIG3-RFI-CO-S-8741-00
KAIG3-RFI-CO-S-8749 00 KAIG3-RFI-CO-S-8749-00
KAIG3-RFI-CO-S-8751 00 KAIG3-RFI-CO-S-8751-00
KAIG3-RFI-CO-S-8752 00 KAIG3-RFI-CO-S-8752-00
KAIG3-RFI-CO-S-8753 00 KAIG3-RFI-CO-S-8753-00
KAIG3-RFI-CO-S-8754 00 KAIG3-RFI-CO-S-8754-00
KAIG3-RFI-CO-S-8755 00 KAIG3-RFI-CO-S-8755-00
KAIG3-RFI-CO-S-8702 00 KAIG3-RFI-CO-S-8702-00
KAIG3-RFI-CO-S-8703 00 KAIG3-RFI-CO-S-8703-00
KAIG3-RFI-CO-S-8706 00 KAIG3-RFI-CO-S-8706-00
KAIG3-RFI-CO-S-8707 00 KAIG3-RFI-CO-S-8707-00
KAIG3-RFI-CO-S-8708 00 KAIG3-RFI-CO-S-8708-00
KAIG3-RFI-PC-S-8709 00 KAIG3-RFI-PC-S-8709-00
KAIG3-RFI-PC-S-8710 00 KAIG3-RFI-PC-S-8710-00
KAIG3-RFI-CO-S-8718 00 KAIG3-RFI-CO-S-8718-00
KAIG3-RFI-CO-S-8719 00 KAIG3-RFI-CO-S-8719-00
KAIG3-RFI-CO-S-8720 00 KAIG3-RFI-CO-S-8720-00
KAIG3-RFI-CO-S-8727 00 KAIG3-RFI-CO-S-8727-00
KAIG3-RFI-CO-S-8728 00 KAIG3-RFI-CO-S-8728-00
KAIG3-RFI-CO-C-7073 00 KAIG3-RFI-CO-C-7073-00
KAIG3-RFI-CF-C-7074 00 KAIG3-RFI-CF-C-7074-00
KAIG3-RFI-MC-C-6067 01 KAIG3-RFI-MC-C-6067-01
KAIG3-RFI-VG-C-7045 00 KAIG3-RFI-VG-C-7045-00
KAIG3-RFI-CO-C-7047 00 KAIG3-RFI-CO-C-7047-00
KAIG3-RFI-CO-SU-2877 00 KAIG3-RFI-CO-SU-2877-00
KAIG3-RFI-CO-SU-2883 00 KAIG3-RFI-CO-SU-2883-00
KAIG3-RFI-VG-SU-2879 00 KAIG3-RFI-VG-SU-2879-00
KAIG3-RFI-CO-SU-2871 00 KAIG3-RFI-CO-SU-2871-00
KAIG3-RFI-CO-SU-2881 00 KAIG3-RFI-CO-SU-2881-00
KAIG3-RFI-CO-SU-2882 00 KAIG3-RFI-CO-SU-2882-00
KAIG3-RFI-PC-SU-2872 00 KAIG3-RFI-PC-SU-2872-00
KAIG3-RFI-CO-SU-2875 00 KAIG3-RFI-CO-SU-2875-00
KAIG3-RFI-CO-SU-2878 00 KAIG3-RFI-CO-SU-2878-00
KAIG3-RFI-MB-SS-0404 00 KAIG3-RFI-MB-SS-0404-00
KAIG3-RFI-MB-SS-0403 00 KAIG3-RFI-MB-SS-0403-00
KAIG3-RFI-PC-P-0284 00 KAIG3-RFI-PC-P-0284-00
KAIG3-RFI-SW-C-7052 00 KAIG3-RFI-SW-C-7052-00
KAIG3-RFI-SW-C-7051 00 KAIG3-RFI-SW-C-7051-00
KAIG3-RFI-PA-C-7065 00 KAIG3-RFI-PA-C-7065-00
KAIG3-RFI-SW-C-7059 00 KAIG3-RFI-SW-C-7059-00
KAIG3-RFI-SW-C-7058 00 KAIG3-RFI-SW-C-7058-00
KAIG3-RFI-WG-P-0283 00 KAIG3-RFI-WG-P-0283-00
KAIG3-RFI-SW-C-7050 00 KAIG3-RFI-SW-C-7050-00
KAIG3-RFI-SW-C-7049 00 KAIG3-RFI-SW-C-7049-00
KAIG3-RFI-SW-C-7048 00 KAIG3-RFI-SW-C-7048-00
KAIG3-RFI-SW-C-7044 00 KAIG3-RFI-SW-C-7044-00
KAIG3-RFI-SW-C-7043 00 KAIG3-RFI-SW-C-7043-00
KAIG3-RFI-SW-C-7042 00 KAIG3-RFI-SW-C-7042-00
KAIG3-RFI-SW-C-7041 00 KAIG3-RFI-SW-C-7041-00
KAIG3-RFI-SW-LS-1473 00 KAIG3-RFI-SW-LS-1473-00
KAIG3-RFI-PC-E-0548 00 KAIG3-RFI-PC-E-0548-00
KAIG3-RFI-PC-E-0547 00 KAIG3-RFI-PC-E-0547-00
KAIG3-RFI-PC-E-0546 00 KAIG3-RFI-PC-E-0546-00
KAIG3-RFI-CF-C-7053 00 KAIG3-RFI-CF-C-7053-00
KAIG3-RFI-CO-S-8415 01 KAIG3-RFI-CO-S-8415-01
KAIG3-RFI-CO-S-8475 01 KAIG3-RFI-CO-S-8475-01
KAIG3-RFI-CF-C-7054 00 KAIG3-RFI-CF-C-7054-00
KAIG3-RFI-CO-C-7055 00 KAIG3-RFI-CO-C-7055-00
KAIG3-RFI-MC-C-7056 00 KAIG3-RFI-MC-C-7056-00
KAIG3-RFI-CO-C-7057 00 KAIG3-RFI-CO-C-7057-00
KAIG3-RFI-CF-S-7861 01 KAIG3-RFI-CF-S-7861-01
KAIG3-RFI-NA-LC-0762 00 KAIG3-RFI-NA-LC-0762-00
KAIG3-RFI-NA-LC-0761 00 KAIG3-RFI-NA-LC-0761-00
KAIG3-RFI-MB-LC-0759 00 KAIG3-RFI-MB-LC-0759-00
KAIG3-RFI-MB-LC-0758 00 KAIG3-RFI-MB-LC-0758-00
KAIG3-RFI-SW-E-0543 00 KAIG3-RFI-SW-E-0543-00
KAIG3-RFI-SW-E-0542 00 KAIG3-RFI-SW-E-0542-00
KAIG3-RFI-MB-E-0541 00 KAIG3-RFI-MB-E-0541-00
KAIG3-RFI-MB-E-0540 00 KAIG3-RFI-MB-E-0540-00
KAIG3-RFI-CO-SS-0400 00 KAIG3-RFI-CO-SS-0400-00
KAIG3-RFI-CO-SS-0399 00 KAIG3-RFI-CO-SS-0399-00
KAIG3-RFI-CO-SS-0398 00 KAIG3-RFI-CO-SS-0398-00
KAIG3-RFI-CO-SS-0401 00 KAIG3-RFI-CO-SS-0401-00
KAIG3-RFI-CO-C-6972 00 KAIG3-RFI-CO-C-6972-00
KAIG3-RFI-CO-S-8275 00 KAIG3-RFI-CO-S-8275-00
KAIG3-RFI-SW-C-7040 00 KAIG3-RFI-SW-C-7040-00
KAIG3-RFI-SW-C-7039 00 KAIG3-RFI-SW-C-7039-00
KAIG3-RFI-SW-C-7035 00 KAIG3-RFI-SW-C-7035-00
KAIG3-RFI-SW-C-7034 00 KAIG3-RFI-SW-C-7034-00
KAIG3-RFI-SW-C-7033 00 KAIG3-RFI-SW-C-7033-00
KAIG3-RFI-SW-C-7032 00 KAIG3-RFI-SW-C-7032-00
KAIG3-RFI-SW-C-7031 00 KAIG3-RFI-SW-C-7031-00
KAIG3-RFI-SW-C-7030 00 KAIG3-RFI-SW-C-7030-00
KAIG3-RFI-SW-C-7029 00 KAIG3-RFI-SW-C-7029-00
KAIG3-RFI-SW-C-7028 00 KAIG3-RFI-SW-C-7028-00
KAIG3-RFI-SW-C-7027 00 KAIG3-RFI-SW-C-7027-00
KAIG3-RFI-SW-C-7026 00 KAIG3-RFI-SW-C-7026-00
KAIG3-RFI-SW-C-7025 00 KAIG3-RFI-SW-C-7025-00
KAIG3-RFI-SW-C-7024 00 KAIG3-RFI-SW-C-7024-00
KAIG3-RFI-SW-C-7023 00 KAIG3-RFI-SW-C-7023-00
KAIG3-RFI-CO-SU-2869 00 KAIG3-RFI-CO-SU-2869-00
KAIG3-RFI-SW-C-7022 00 KAIG3-RFI-SW-C-7022-00
KAIG3-RFI-CO-S-8698 00 KAIG3-RFI-CO-S-8698-00
KAIG3-RFI-SW-C-7021 00 KAIG3-RFI-SW-C-7021-00
KAIG3-RFI-CO-S-8697 00 KAIG3-RFI-CO-S-8697-00
KAIG3-RFI-SW-C-7020 00 KAIG3-RFI-SW-C-7020-00
KAIG3-RFI-SW-C-7019 00 KAIG3-RFI-SW-C-7019-00
KAIG3-RFI-CO-S-8685 00 KAIG3-RFI-CO-S-8685-00
KAIG3-RFI-CO-S-8421 00 KAIG3-RFI-CO-S-8421-00
KAIG3-RFI-SW-C-7016 00 KAIG3-RFI-SW-C-7016-00
KAIG3-RFI-SW-C-7015 00 KAIG3-RFI-SW-C-7015-00
KAIG3-RFI-SW-C-6985 00 KAIG3-RFI-SW-C-6985-00
KAIG3-RFI-SW-C-6984 00 KAIG3-RFI-SW-C-6984-00
KAIG3-RFI-CO-S-8472 00 KAIG3-RFI-CO-S-8472-00
KAIG3-RFI-MC-S-8690 00 KAIG3-RFI-MC-S-8690-00
KAIG3-RFI-CO-S-8636 00 KAIG3-RFI-CO-S-8636-00
KAIG3-RFI-CO-SU-2867 00 KAIG3-RFI-CO-SU-2867-00
KAIG3-RFI-CO-S-8689 00 KAIG3-RFI-CO-S-8689-00
KAIG3-RFI-CO-S-8688 00 KAIG3-RFI-CO-S-8688-00
KAIG3-RFI-WG-LS-1472 00 KAIG3-RFI-WG-LS-1472-00
KAIG3-RFI-WG-LS-1471 00 KAIG3-RFI-WG-LS-1471-00
KAIG3-RFI-WG-C-7046 00 KAIG3-RFI-WG-C-7046-00
KAIG3-RFI-EC-SU-2874 00 KAIG3-RFI-EC-SU-2874-00
KAIG3-RFI-SW-S-8668 00 KAIG3-RFI-SW-S-8668-00
KAIG3-RFI-SW-S-8717 00 KAIG3-RFI-SW-S-8717-00
KAIG3-RFI-EC-S-8716 00 KAIG3-RFI-EC-S-8716-00
KAIG3-RFI-EC-S-8715 00 KAIG3-RFI-EC-S-8715-00
KAIG3-RFI-CO-C-7038 00 KAIG3-RFI-CO-C-7038-00
KAIG3-RFI-EC-S-8714 00 KAIG3-RFI-EC-S-8714-00
KAIG3-RFI-MC-C-7037 00 KAIG3-RFI-MC-C-7037-00
KAIG3-RFI-CF-C-7036 00 KAIG3-RFI-CF-C-7036-00
KAIG3-RFI-CO-S-8722 00 KAIG3-RFI-CO-S-8722-00
KAIG3-RFI-CO-SU-2876 00 KAIG3-RFI-CO-SU-2876-00
KAIG3-RFI-CO-S-8721 00 KAIG3-RFI-CO-S-8721-00
KAIG3-RFI-CF-S-8726 00 KAIG3-RFI-CF-S-8726-00
KAIG3-RFI-CF-S-8725 00 KAIG3-RFI-CF-S-8725-00
KAIG3-RFI-CF-S-8724 00 KAIG3-RFI-CF-S-8724-00
KAIG3-RFI-CO-S-8713 00 KAIG3-RFI-CO-S-8713-00
KAIG3-RFI-CO-S-8711 00 KAIG3-RFI-CO-S-8711-00
KAIG3-RFI-CO-SU-2873 00 KAIG3-RFI-CO-SU-2873-00
KAIG3-RFI-SW-LS-1468 00 KAIG3-RFI-SW-LS-1468-00
KAIG3-RFI-WG-LS-1470 00 KAIG3-RFI-WG-LS-1470-00
KAIG3-RFI-SW-LS-1469 00 KAIG3-RFI-SW-LS-1469-00
KAIG3-RFI-SW-M-0274 00 KAIG3-RFI-SW-M-0274-00
KAIG3-RFI-PC-LC-0757 00 KAIG3-RFI-PC-LC-0757-00
KAIG3-RFI-PC-LC-0756 00 KAIG3-RFI-PC-LC-0756-00
KAIG3-RFI-CO-S-8692 00 KAIG3-RFI-CO-S-8692-00
KAIG3-RFI-CO-S-8693 00 KAIG3-RFI-CO-S-8693-00
KAIG3-RFI-CF-S-8694 00 KAIG3-RFI-CF-S-8694-00
KAIG3-RFI-CF-S-8696 00 KAIG3-RFI-CF-S-8696-00
KAIG3-RFI-CF-S-8695 00 KAIG3-RFI-CF-S-8695-00
KAIG3-RFI-CO-S-8691 00 KAIG3-RFI-CO-S-8691-00
KAIG3-RFI-CF-SU-2865 00 KAIG3-RFI-CF-SU-2865-00
KAIG3-RFI-CF-S-8682 00 KAIG3-RFI-CF-S-8682-00
KAIG3-RFI-CF-SU-2859 00 KAIG3-RFI-CF-SU-2859-00
KAIG3-RFI-CF-S-8681 00 KAIG3-RFI-CF-S-8681-00
KAIG3-RFI-CF-S-8645 00 KAIG3-RFI-CF-S-8645-00
KAIG3-RFI-CF-S-8644 00 KAIG3-RFI-CF-S-8644-00
KAIG3-RFI-CO-S-8235 00 KAIG3-RFI-CO-S-8235-00
KAIG3-RFI-CO-SU-2866 00 KAIG3-RFI-CO-SU-2866-00
KAIG3-RFI-CO-S-8684 00 KAIG3-RFI-CO-S-8684-00
KAIG3-RFI-CO-S-8683 00 KAIG3-RFI-CO-S-8683-00
KAIG3-RFI-CO-S-8676 00 KAIG3-RFI-CO-S-8676-00
KAIG3-RFI-CO-S-8506 00 KAIG3-RFI-CO-S-8506-00
KAIG3-RFI-CO-S-8623 00 KAIG3-RFI-CO-S-8623-00
KAIG3-RFI-CC-C-6891 00 KAIG3-RFI-CC-C-6891-00
KAIG3-RFI-CO-C-7001 00 KAIG3-RFI-CO-C-7001-00
KAIG3-RFI-CF-C-7000 00 KAIG3-RFI-CF-C-7000-00
KAIG3-RFI-CF-C-6999 00 KAIG3-RFI-CF-C-6999-00
KAIG3-RFI-MC-C-7002 00 KAIG3-RFI-MC-C-7002-00
KAIG3-RFI-WG-E-0545 00 KAIG3-RFI-WG-E-0545-00
KAIG3-RFI-WG-E-0544 00 KAIG3-RFI-WG-E-0544-00
KAIG3-RFI-WG-LC-0760 00 KAIG3-RFI-WG-LC-0760-00
KAIG3-RFI-SW-C-7017 00 KAIG3-RFI-SW-C-7017-00
KAIG3-RFI-SW-C-7014 00 KAIG3-RFI-SW-C-7014-00
KAIG3-RFI-SW-C-7013 00 KAIG3-RFI-SW-C-7013-00
KAIG3-RFI-SW-C-7012 00 KAIG3-RFI-SW-C-7012-00
KAIG3-RFI-SW-C-7011 00 KAIG3-RFI-SW-C-7011-00
KAIG3-RFI-SW-C-7010 00 KAIG3-RFI-SW-C-7010-00
KAIG3-RFI-SW-C-7009 00 KAIG3-RFI-SW-C-7009-00
KAIG3-RFI-SW-C-7008 00 KAIG3-RFI-SW-C-7008-00
KAIG3-RFI-SW-C-7007 00 KAIG3-RFI-SW-C-7007-00
KAIG3-RFI-SW-C-6990 00 KAIG3-RFI-SW-C-6990-00
KAIG3-RFI-CO-A-1000 00 KAIG3-RFI-CO-A-1000-00
KAIG3-RFI-CO-A-0999 00 KAIG3-RFI-CO-A-0999-00
KAIG3-RFI-SW-C-6989 00 KAIG3-RFI-SW-C-6989-00
KAIG3-RFI-SW-C-6983 00 KAIG3-RFI-SW-C-6983-00
KAIG3-RFI-SW-C-6982 00 KAIG3-RFI-SW-C-6982-00
KAIG3-RFI-SW-C-6981 00 KAIG3-RFI-SW-C-6981-00
KAIG3-RFI-MB-E-0531 00 KAIG3-RFI-MB-E-0531-00
KAIG3-RFI-SW-C-6980 00 KAIG3-RFI-SW-C-6980-00
KAIG3-RFI-SW-M-0282 00 KAIG3-RFI-SW-M-0282-00
KAIG3-RFI-WG-P-0281 00 KAIG3-RFI-WG-P-0281-00
KAIG3-RFI-WG-C-7018 00 KAIG3-RFI-WG-C-7018-00
KAIG3-RFI-DG-C-7006 00 KAIG3-RFI-DG-C-7006-00
KAIG3-RFI-DG-C-7005 00 KAIG3-RFI-DG-C-7005-00
KAIG3-RFI-PG-C-7004 00 KAIG3-RFI-PG-C-7004-00
KAIG3-RFI-PG-C-7003 00 KAIG3-RFI-PG-C-7003-00
KAIG3-RFI-WG-LS-1467 00 KAIG3-RFI-WG-LS-1467-00
KAIG3-RFI-EC-S-8667 00 KAIG3-RFI-EC-S-8667-00
KAIG3-RFI-EC-SU-2868 00 KAIG3-RFI-EC-SU-2868-00
KAIG3-RFI-MC-C-6998 00 KAIG3-RFI-MC-C-6998-00
KAIG3-RFI-CO-C-6997 00 KAIG3-RFI-CO-C-6997-00
KAIG3-RFI-VG-C-6973 00 KAIG3-RFI-VG-C-6973-00
KAIG3-RFI-VG-C-6975 00 KAIG3-RFI-VG-C-6975-00
KAIG3-RFI-MC-S-8680 00 KAIG3-RFI-MC-S-8680-00
KAIG3-RFI-MC-S-8679 00 KAIG3-RFI-MC-S-8679-00
KAIG3-RFI-MC-S-8678 00 KAIG3-RFI-MC-S-8678-00
KAIG3-RFI-CO-SS-0372 01 KAIG3-RFI-CO-SS-0372-01
KAIG3-RFI-MC-SU-2864 00 KAIG3-RFI-MC-SU-2864-00
KAIG3-RFI-CO-SU-2860 00 KAIG3-RFI-CO-SU-2860-00
KAIG3-RFI-SW-C-6988 00 KAIG3-RFI-SW-C-6988-00
KAIG3-RFI-SW-C-6987 00 KAIG3-RFI-SW-C-6987-00
KAIG3-RFI-SW-C-6986 00 KAIG3-RFI-SW-C-6986-00
KAIG3-RFI-SW-C-6979 00 KAIG3-RFI-SW-C-6979-00
KAIG3-RFI-SW-C-6978 00 KAIG3-RFI-SW-C-6978-00
KAIG3-RFI-SW-C-6966 00 KAIG3-RFI-SW-C-6966-00
KAIG3-RFI-SW-C-6965 00 KAIG3-RFI-SW-C-6965-00
KAIG3-RFI-SW-C-6960 00 KAIG3-RFI-SW-C-6960-00
KAIG3-RFI-SW-C-6959 00 KAIG3-RFI-SW-C-6959-00
KAIG3-RFI-SW-C-6958 00 KAIG3-RFI-SW-C-6958-00
KAIG3-RFI-SW-C-6940 01 KAIG3-RFI-SW-C-6940-01
KAIG3-RFI-SW-C-6706 01 KAIG3-RFI-SW-C-6706-01
KAIG3-RFI-SW-C-6690 01 KAIG3-RFI-SW-C-6690-01
KAIG3-RFI-CO-S-8534 00 KAIG3-RFI-CO-S-8534-00
KAIG3-RFI-SM-E-0539 00 KAIG3-RFI-SM-E-0539-00
KAIG3-RFI-MB-LC-0677 00 KAIG3-RFI-MB-LC-0677-00
KAIG3-RFI-SM-LC-0751 00 KAIG3-RFI-SM-LC-0751-00
KAIG3-RFI-PC-LC-0754 00 KAIG3-RFI-PC-LC-0754-00
KAIG3-RFI-WG-C-6996 00 KAIG3-RFI-WG-C-6996-00
KAIG3-RFI-WG-C-6995 00 KAIG3-RFI-WG-C-6995-00
KAIG3-RFI-AG-C-6994 00 KAIG3-RFI-AG-C-6994-00
KAIG3-RFI-ZG-C-6993 00 KAIG3-RFI-ZG-C-6993-00
KAIG3-RFI-WG-C-6992 00 KAIG3-RFI-WG-C-6992-00
KAIG3-RFI-TG-C-6991 00 KAIG3-RFI-TG-C-6991-00
KAIG3-RFI-PC-S-8057 00 KAIG3-RFI-PC-S-8057-00
KAIG3-RFI-VG-C-6976 00 KAIG3-RFI-VG-C-6976-00
KAIG3-RFI-CO-SS-0397 00 KAIG3-RFI-CO-SS-0397-00
KAIG3-RFI-SW-M-0280 00 KAIG3-RFI-SW-M-0280-00
KAIG3-RFI-CC-C-6915 00 KAIG3-RFI-CC-C-6915-00
KAIG3-RFI-SW-M-0279 00 KAIG3-RFI-SW-M-0279-00
KAIG3-RFI-CO-C-6970 00 KAIG3-RFI-CO-C-6970-00
KAIG3-RFI-MC-C-6971 00 KAIG3-RFI-MC-C-6971-00
KAIG3-RFI-SW-LC-0749 00 KAIG3-RFI-SW-LC-0749-00
KAIG3-RFI-CF-C-6968 00 KAIG3-RFI-CF-C-6968-00
KAIG3-RFI-VG-C-6974 00 KAIG3-RFI-VG-C-6974-00
KAIG3-RFI-CF-C-6977 00 KAIG3-RFI-CF-C-6977-00
KAIG3-RFI-CO-S-8677 00 KAIG3-RFI-CO-S-8677-00
KAIG3-RFI-SW-P-0278 00 KAIG3-RFI-SW-P-0278-00
KAIG3-RFI-CO-S-8657 00 KAIG3-RFI-CO-S-8657-00
KAIG3-RFI-WG-LS-1466 00 KAIG3-RFI-WG-LS-1466-00
KAIG3-RFI-CO-S-8658 00 KAIG3-RFI-CO-S-8658-00
KAIG3-RFI-CO-S-8672 00 KAIG3-RFI-CO-S-8672-00
KAIG3-RFI-CC-S-8669 00 KAIG3-RFI-CC-S-8669-00
KAIG3-RFI-CC-SU-2863 00 KAIG3-RFI-CC-SU-2863-00
KAIG3-RFI-CO-SS-0396 00 KAIG3-RFI-CO-SS-0396-00
KAIG3-RFI-CO-S-8656 00 KAIG3-RFI-CO-S-8656-00
KAIG3-RFI-CO-S-8655 00 KAIG3-RFI-CO-S-8655-00
KAIG3-RFI-CO-S-8654 00 KAIG3-RFI-CO-S-8654-00
KAIG3-RFI-CO-S-8653 00 KAIG3-RFI-CO-S-8653-00
KAIG3-RFI-MB-SS-0376 01 KAIG3-RFI-MB-SS-0376-01
KAIG3-RFI-AG-C-6967 00 KAIG3-RFI-AG-C-6967-00
KAIG3-RFI-EC-SU-2861 00 KAIG3-RFI-EC-SU-2861-00
KAIG3-RFI-EC-S-8666 00 KAIG3-RFI-EC-S-8666-00
KAIG3-RFI-EC-S-8665 00 KAIG3-RFI-EC-S-8665-00
KAIG3-RFI-CO-C-6259 00 KAIG3-RFI-CO-C-6259-00
KAIG3-RFI-WG-LS-1461 00 KAIG3-RFI-WG-LS-1461-00
KAIG3-RFI-PG-P-0277 00 KAIG3-RFI-PG-P-0277-00
KAIG3-RFI-MB-P-0276 00 KAIG3-RFI-MB-P-0276-00
KAIG3-RFI-TG-P-0275 00 KAIG3-RFI-TG-P-0275-00
KAIG3-RFI-SW-LS-1462 00 KAIG3-RFI-SW-LS-1462-00
KAIG3-RFI-SW-C-6964 00 KAIG3-RFI-SW-C-6964-00
KAIG3-RFI-SW-C-6963 00 KAIG3-RFI-SW-C-6963-00
KAIG3-RFI-SW-C-6962 00 KAIG3-RFI-SW-C-6962-00
KAIG3-RFI-SW-C-6961 00 KAIG3-RFI-SW-C-6961-00
KAIG3-RFI-SW-C-6957 00 KAIG3-RFI-SW-C-6957-00
KAIG3-RFI-SW-C-6956 00 KAIG3-RFI-SW-C-6956-00
KAIG3-RFI-SW-C-6955 00 KAIG3-RFI-SW-C-6955-00
KAIG3-RFI-SW-C-6954 00 KAIG3-RFI-SW-C-6954-00
KAIG3-RFI-SW-C-6953 00 KAIG3-RFI-SW-C-6953-00
KAIG3-RFI-SW-C-6952 00 KAIG3-RFI-SW-C-6952-00
KAIG3-RFI-SW-C-6680 01 KAIG3-RFI-SW-C-6680-01
KAIG3-RFI-SW-LS-1465 00 KAIG3-RFI-SW-LS-1465-00
KAIG3-RFI-SW-LS-1464 00 KAIG3-RFI-SW-LS-1464-00
KAIG3-RFI-SW-LS-1463 00 KAIG3-RFI-SW-LS-1463-00
KAIG3-RFI-CO-SU-2862 00 KAIG3-RFI-CO-SU-2862-00
KAIG3-RFI-CO-S-8663 00 KAIG3-RFI-CO-S-8663-00
KAIG3-RFI-CO-S-8647 00 KAIG3-RFI-CO-S-8647-00
KAIG3-RFI-CO-S-8648 00 KAIG3-RFI-CO-S-8648-00
KAIG3-RFI-MC-S-8661 00 KAIG3-RFI-MC-S-8661-00
KAIG3-RFI-MC-S-8659 00 KAIG3-RFI-MC-S-8659-00
KAIG3-RFI-MC-S-8660 00 KAIG3-RFI-MC-S-8660-00
KAIG3-RFI-CO-S-8649 00 KAIG3-RFI-CO-S-8649-00
KAIG3-RFI-MC-S-8634 00 KAIG3-RFI-MC-S-8634-00
KAIG3-RFI-MC-S-8392 01 KAIG3-RFI-MC-S-8392-01
KAIG3-RFI-CO-S-8527 00 KAIG3-RFI-CO-S-8527-00
KAIG3-RFI-MC-S-8633 00 KAIG3-RFI-MC-S-8633-00
KAIG3-RFI-CO-SU-2849 00 KAIG3-RFI-CO-SU-2849-00
KAIG3-RFI-CO-S-8617 00 KAIG3-RFI-CO-S-8617-00
KAIG3-RFI-MC-SU-2848 00 KAIG3-RFI-MC-SU-2848-00
KAIG3-RFI-MC-S-8610 00 KAIG3-RFI-MC-S-8610-00
KAIG3-RFI-CO-SU-2857 00 KAIG3-RFI-CO-SU-2857-00
KAIG3-RFI-CO-SU-2856 00 KAIG3-RFI-CO-SU-2856-00
KAIG3-RFI-CO-S-8621 00 KAIG3-RFI-CO-S-8621-00
KAIG3-RFI-CO-C-6941 00 KAIG3-RFI-CO-C-6941-00
KAIG3-RFI-CO-SU-2854 00 KAIG3-RFI-CO-SU-2854-00
KAIG3-RFI-CF-C-6914 00 KAIG3-RFI-CF-C-6914-00
KAIG3-RFI-EC-S-8637 00 KAIG3-RFI-EC-S-8637-00
KAIG3-RFI-EC-SU-2855 00 KAIG3-RFI-EC-SU-2855-00
KAIG3-RFI-WG-LS-1460 00 KAIG3-RFI-WG-LS-1460-00
KAIG3-RFI-TG-LS-1458 00 KAIG3-RFI-TG-LS-1458-00
KAIG3-RFI-TG-LS-1453 00 KAIG3-RFI-TG-LS-1453-00
KAIG3-RFI-DG-C-6950 00 KAIG3-RFI-DG-C-6950-00
KAIG3-RFI-DG-C-6949 00 KAIG3-RFI-DG-C-6949-00
KAIG3-RFI-DG-C-6948 00 KAIG3-RFI-DG-C-6948-00
KAIG3-RFI-DG-C-6947 00 KAIG3-RFI-DG-C-6947-00
KAIG3-RFI-TG-C-6926 00 KAIG3-RFI-TG-C-6926-00
KAIG3-RFI-TG-E-0404 01 KAIG3-RFI-TG-E-0404-01
KAIG3-RFI-SW-LS-1459 00 KAIG3-RFI-SW-LS-1459-00
KAIG3-RFI-SW-C-6951 00 KAIG3-RFI-SW-C-6951-00
KAIG3-RFI-SW-C-6946 00 KAIG3-RFI-SW-C-6946-00
KAIG3-RFI-SW-C-6945 00 KAIG3-RFI-SW-C-6945-00
KAIG3-RFI-SW-C-6944 00 KAIG3-RFI-SW-C-6944-00
KAIG3-RFI-SW-C-6943 00 KAIG3-RFI-SW-C-6943-00
KAIG3-RFI-SW-C-6942 00 KAIG3-RFI-SW-C-6942-00
KAIG3-RFI-SW-C-6940 00 KAIG3-RFI-SW-C-6940-00
KAIG3-RFI-SW-C-6939 00 KAIG3-RFI-SW-C-6939-00
KAIG3-RFI-SW-C-6938 00 KAIG3-RFI-SW-C-6938-00
KAIG3-RFI-SW-C-6937 00 KAIG3-RFI-SW-C-6937-00
KAIG3-RFI-SW-C-6936 00 KAIG3-RFI-SW-C-6936-00
KAIG3-RFI-SW-C-6935 00 KAIG3-RFI-SW-C-6935-00
KAIG3-RFI-SW-C-6934 00 KAIG3-RFI-SW-C-6934-00
KAIG3-RFI-SW-C-6933 00 KAIG3-RFI-SW-C-6933-00
KAIG3-RFI-SW-C-6932 00 KAIG3-RFI-SW-C-6932-00
KAIG3-RFI-SW-C-6930 00 KAIG3-RFI-SW-C-6930-00
KAIG3-RFI-SW-C-6925 00 KAIG3-RFI-SW-C-6925-00
KAIG3-RFI-SW-C-6924 00 KAIG3-RFI-SW-C-6924-00
KAIG3-RFI-SW-C-6905 00 KAIG3-RFI-SW-C-6905-00
KAIG3-RFI-SW-C-6904 00 KAIG3-RFI-SW-C-6904-00
KAIG3-RFI-SW-C-6903 00 KAIG3-RFI-SW-C-6903-00
KAIG3-RFI-SW-C-6682 01 KAIG3-RFI-SW-C-6682-01
KAIG3-RFI-SW-C-6659 01 KAIG3-RFI-SW-C-6659-01
KAIG3-RFI-SW-C-6923 00 KAIG3-RFI-SW-C-6923-00
KAIG3-RFI-SW-C-6922 00 KAIG3-RFI-SW-C-6922-00
KAIG3-RFI-SW-C-6921 00 KAIG3-RFI-SW-C-6921-00
KAIG3-RFI-SW-C-6920 00 KAIG3-RFI-SW-C-6920-00
KAIG3-RFI-SW-C-6919 00 KAIG3-RFI-SW-C-6919-00
KAIG3-RFI-SW-C-6918 00 KAIG3-RFI-SW-C-6918-00
KAIG3-RFI-SW-C-6917 00 KAIG3-RFI-SW-C-6917-00
KAIG3-RFI-SW-C-6902 00 KAIG3-RFI-SW-C-6902-00
KAIG3-RFI-SW-C-6900 00 KAIG3-RFI-SW-C-6900-00
KAIG3-RFI-ZG-C-6927 00 KAIG3-RFI-ZG-C-6927-00
KAIG3-RFI-SW-C-6899 00 KAIG3-RFI-SW-C-6899-00
KAIG3-RFI-SW-C-6898 00 KAIG3-RFI-SW-C-6898-00
KAIG3-RFI-SW-C-6897 00 KAIG3-RFI-SW-C-6897-00
KAIG3-RFI-SW-LS-1457 00 KAIG3-RFI-SW-LS-1457-00
KAIG3-RFI-SW-LS-1451 00 KAIG3-RFI-SW-LS-1451-00
KAIG3-RFI-CO-S-8638 00 KAIG3-RFI-CO-S-8638-00
KAIG3-RFI-CO-S-8635 00 KAIG3-RFI-CO-S-8635-00
KAIG3-RFI-MB-LC-0676 00 KAIG3-RFI-MB-LC-0676-00
KAIG3-RFI-MB-LC-0746 00 KAIG3-RFI-MB-LC-0746-00
KAIG3-RFI-SW-LC-0692 00 KAIG3-RFI-SW-LC-0692-00
KAIG3-RFI-MB-LC-0678 00 KAIG3-RFI-MB-LC-0678-00
KAIG3-RFI-CO-A-0998 00 KAIG3-RFI-CO-A-0998-00
KAIG3-RFI-MB-LC-0698 00 KAIG3-RFI-MB-LC-0698-00
KAIG3-RFI-RG-C-6911 00 KAIG3-RFI-RG-C-6911-00
KAIG3-RFI-CF-C-6913 00 KAIG3-RFI-CF-C-6913-00
KAIG3-RFI-CO-C-6912 00 KAIG3-RFI-CO-C-6912-00
KAIG3-RFI-CO-S-8615 00 KAIG3-RFI-CO-S-8615-00
KAIG3-RFI-CO-S-8609 00 KAIG3-RFI-CO-S-8609-00
KAIG3-RFI-SW-C-6282 00 KAIG3-RFI-SW-C-6282-00
KAIG3-RFI-CO-S-8613 00 KAIG3-RFI-CO-S-8613-00
KAIG3-RFI-CO-S-8612 00 KAIG3-RFI-CO-S-8612-00
KAIG3-RFI-CO-S-8607 00 KAIG3-RFI-CO-S-8607-00
KAIG3-RFI-CO-S-8616 00 KAIG3-RFI-CO-S-8616-00
KAIG3-RFI-CO-S-8614 00 KAIG3-RFI-CO-S-8614-00
KAIG3-RFI-CO-S-8608 00 KAIG3-RFI-CO-S-8608-00
KAIG3-RFI-CO-S-8631 00 KAIG3-RFI-CO-S-8631-00
KAIG3-RFI-CO-SU-2850 00 KAIG3-RFI-CO-SU-2850-00
KAIG3-RFI-CO-S-8619 00 KAIG3-RFI-CO-S-8619-00
KAIG3-RFI-CO-S-8622 00 KAIG3-RFI-CO-S-8622-00
KAIG3-RFI-CO-SU-2851 00 KAIG3-RFI-CO-SU-2851-00
KAIG3-RFI-CO-S-8547 00 KAIG3-RFI-CO-S-8547-00
KAIG3-RFI-CO-SU-2853 00 KAIG3-RFI-CO-SU-2853-00
KAIG3-RFI-CO-S-8624 00 KAIG3-RFI-CO-S-8624-00
KAIG3-RFI-CO-SU-2852 00 KAIG3-RFI-CO-SU-2852-00
KAIG3-RFI-SW-LS-1456 00 KAIG3-RFI-SW-LS-1456-00
KAIG3-RFI-SW-LS-1455 00 KAIG3-RFI-SW-LS-1455-00
KAIG3-RFI-SW-C-6929 00 KAIG3-RFI-SW-C-6929-00
KAIG3-RFI-CO-S-8626 00 KAIG3-RFI-CO-S-8626-00
KAIG3-RFI-CO-S-8625 00 KAIG3-RFI-CO-S-8625-00
KAIG3-RFI-SW-C-6928 00 KAIG3-RFI-SW-C-6928-00
KAIG3-RFI-SW-C-6910 00 KAIG3-RFI-SW-C-6910-00
KAIG3-RFI-SW-C-6909 00 KAIG3-RFI-SW-C-6909-00
KAIG3-RFI-MC-C-6889 00 KAIG3-RFI-MC-C-6889-00
KAIG3-RFI-MC-S-8390 01 KAIG3-RFI-MC-S-8390-01
KAIG3-RFI-CO-SU-2735 00 KAIG3-RFI-CO-SU-2735-00
KAIG3-RFI-CO-S-8153 00 KAIG3-RFI-CO-S-8153-00
KAIG3-RFI-PT-A-0997 00 KAIG3-RFI-PT-A-0997-00
KAIG3-RFI-WG-LS-1452 00 KAIG3-RFI-WG-LS-1452-00
KAIG3-RFI-AG-C-6743 00 KAIG3-RFI-AG-C-6743-00
KAIG3-RFI-VG-LC-0748 00 KAIG3-RFI-VG-LC-0748-00
KAIG3-RFI-VG-LC-0747 00 KAIG3-RFI-VG-LC-0747-00
KAIG3-RFI-EC-S-8595 00 KAIG3-RFI-EC-S-8595-00
KAIG3-RFI-SW-C-6901 00 KAIG3-RFI-SW-C-6901-00
KAIG3-RFI-SW-C-6896 00 KAIG3-RFI-SW-C-6896-00
KAIG3-RFI-SW-C-6895 00 KAIG3-RFI-SW-C-6895-00
KAIG3-RFI-SW-C-6894 00 KAIG3-RFI-SW-C-6894-00
KAIG3-RFI-SW-C-6893 00 KAIG3-RFI-SW-C-6893-00
KAIG3-RFI-SW-C-6892 00 KAIG3-RFI-SW-C-6892-00
KAIG3-RFI-SW-C-6908 00 KAIG3-RFI-SW-C-6908-00
KAIG3-RFI-SW-C-6907 00 KAIG3-RFI-SW-C-6907-00
KAIG3-RFI-SW-C-6882 00 KAIG3-RFI-SW-C-6882-00
KAIG3-RFI-SW-C-6881 00 KAIG3-RFI-SW-C-6881-00
KAIG3-RFI-SW-C-6880 00 KAIG3-RFI-SW-C-6880-00
KAIG3-RFI-SW-C-6879 00 KAIG3-RFI-SW-C-6879-00
KAIG3-RFI-DG-LS-1454 00 KAIG3-RFI-DG-LS-1454-00
KAIG3-RFI-SW-C-6871 00 KAIG3-RFI-SW-C-6871-00
KAIG3-RFI-SW-C-6848 01 KAIG3-RFI-SW-C-6848-01
KAIG3-RFI-MC-C-6815 00 KAIG3-RFI-MC-C-6815-00
KAIG3-RFI-CO-C-6888 00 KAIG3-RFI-CO-C-6888-00
KAIG3-RFI-CO-C-6890 00 KAIG3-RFI-CO-C-6890-00
KAIG3-RFI-VG-C-6906 00 KAIG3-RFI-VG-C-6906-00
KAIG3-RFI-CF-S-8588 00 KAIG3-RFI-CF-S-8588-00
KAIG3-RFI-CO-S-8587 00 KAIG3-RFI-CO-S-8587-00
KAIG3-RFI-CO-S-8586 00 KAIG3-RFI-CO-S-8586-00
KAIG3-RFI-CO-SU-2847 00 KAIG3-RFI-CO-SU-2847-00
KAIG3-RFI-CO-S-8584 00 KAIG3-RFI-CO-S-8584-00
KAIG3-RFI-CO-S-8598 00 KAIG3-RFI-CO-S-8598-00
KAIG3-RFI-CO-S-8606 00 KAIG3-RFI-CO-S-8606-00
KAIG3-RFI-CO-S-8605 00 KAIG3-RFI-CO-S-8605-00
KAIG3-RFI-CO-S-8604 00 KAIG3-RFI-CO-S-8604-00
KAIG3-RFI-MC-S-8594 00 KAIG3-RFI-MC-S-8594-00
KAIG3-RFI-CO-S-8590 00 KAIG3-RFI-CO-S-8590-00
KAIG3-RFI-CO-S-8591 00 KAIG3-RFI-CO-S-8591-00
KAIG3-RFI-MC-S-8600 00 KAIG3-RFI-MC-S-8600-00
KAIG3-RFI-MC-S-8599 00 KAIG3-RFI-MC-S-8599-00
KAIG3-RFI-MC-S-8593 00 KAIG3-RFI-MC-S-8593-00
KAIG3-RFI-MC-S-8592 00 KAIG3-RFI-MC-S-8592-00
KAIG3-RFI-CO-S-8589 00 KAIG3-RFI-CO-S-8589-00
KAIG3-RFI-CO-S-8559 00 KAIG3-RFI-CO-S-8559-00
KAIG3-RFI-CO-SS-0395 00 KAIG3-RFI-CO-SS-0395-00
KAIG3-RFI-PC-E-0536 00 KAIG3-RFI-PC-E-0536-00
KAIG3-RFI-MC-S-8558 00 KAIG3-RFI-MC-S-8558-00
KAIG3-RFI-CF-C-6791 00 KAIG3-RFI-CF-C-6791-00
KAIG3-RFI-CO-S-8550 00 KAIG3-RFI-CO-S-8550-00
KAIG3-RFI-CF-SU-2842 00 KAIG3-RFI-CF-SU-2842-00
KAIG3-RFI-CF-S-8575 00 KAIG3-RFI-CF-S-8575-00
KAIG3-RFI-CF-SU-2843 00 KAIG3-RFI-CF-SU-2843-00
KAIG3-RFI-CF-S-8577 00 KAIG3-RFI-CF-S-8577-00
KAIG3-RFI-CF-S-8576 00 KAIG3-RFI-CF-S-8576-00
KAIG3-RFI-CF-S-8578 00 KAIG3-RFI-CF-S-8578-00
KAIG3-RFI-CO-S-6918 00 KAIG3-RFI-CO-S-6918-00
KAIG3-RFI-CO-SS-0394 00 KAIG3-RFI-CO-SS-0394-00
KAIG3-RFI-CO-SS-0393 00 KAIG3-RFI-CO-SS-0393-00
KAIG3-RFI-MC-S-8442 00 KAIG3-RFI-MC-S-8442-00
KAIG3-RFI-CO-S-8403 00 KAIG3-RFI-CO-S-8403-00
KAIG3-RFI-CO-S-8548 00 KAIG3-RFI-CO-S-8548-00
KAIG3-RFI-CO-S-8549 00 KAIG3-RFI-CO-S-8549-00
KAIG3-RFI-CO-A-0947 00 KAIG3-RFI-CO-A-0947-00
KAIG3-RFI-SM-S-8564 00 KAIG3-RFI-SM-S-8564-00
KAIG3-RFI-CO-S-8579 00 KAIG3-RFI-CO-S-8579-00
KAIG3-RFI-CO-SU-2844 00 KAIG3-RFI-CO-SU-2844-00
KAIG3-RFI-CO-S-8543 00 KAIG3-RFI-CO-S-8543-00
KAIG3-RFI-MC-S-8585 00 KAIG3-RFI-MC-S-8585-00
KAIG3-RFI-MC-S-8412 00 KAIG3-RFI-MC-S-8412-00
KAIG3-RFI-CO-SU-2840 00 KAIG3-RFI-CO-SU-2840-00
KAIG3-RFI-CO-A-0946 00 KAIG3-RFI-CO-A-0946-00
KAIG3-RFI-CO-A-0945 00 KAIG3-RFI-CO-A-0945-00
KAIG3-RFI-CO-A-0944 00 KAIG3-RFI-CO-A-0944-00
KAIG3-RFI-CO-A-0943 00 KAIG3-RFI-CO-A-0943-00
KAIG3-RFI-CO-A-0941 00 KAIG3-RFI-CO-A-0941-00
KAIG3-RFI-CO-A-0942 00 KAIG3-RFI-CO-A-0942-00
KAIG3-RFI-CO-A-0940 00 KAIG3-RFI-CO-A-0940-00
KAIG3-RFI-CO-A-0939 00 KAIG3-RFI-CO-A-0939-00
KAIG3-RFI-CO-S-8583 00 KAIG3-RFI-CO-S-8583-00
KAIG3-RFI-CO-SU-2846 00 KAIG3-RFI-CO-SU-2846-00
KAIG3-RFI-CO-S-8581 00 KAIG3-RFI-CO-S-8581-00
KAIG3-RFI-CO-SU-2845 00 KAIG3-RFI-CO-SU-2845-00
KAIG3-RFI-CO-A-0938 00 KAIG3-RFI-CO-A-0938-00
KAIG3-RFI-CO-S-8097 00 KAIG3-RFI-CO-S-8097-00
KAIG3-RFI-CO-S-8222 00 KAIG3-RFI-CO-S-8222-00
KAIG3-RFI-CO-SS-0392 00 KAIG3-RFI-CO-SS-0392-00
KAIG3-RFI-CO-S-7885 00 KAIG3-RFI-CO-S-7885-00
KAIG3-RFI-CO-S-8545 00 KAIG3-RFI-CO-S-8545-00
KAIG3-RFI-CO-S-8562 00 KAIG3-RFI-CO-S-8562-00
KAIG3-RFI-WG-C-6885 00 KAIG3-RFI-WG-C-6885-00
KAIG3-RFI-WG-C-6884 00 KAIG3-RFI-WG-C-6884-00
KAIG3-RFI-WG-C-6883 00 KAIG3-RFI-WG-C-6883-00
KAIG3-RFI-WG-C-6862 00 KAIG3-RFI-WG-C-6862-00
KAIG3-RFI-WG-C-6861 00 KAIG3-RFI-WG-C-6861-00
KAIG3-RFI-WG-C-6860 00 KAIG3-RFI-WG-C-6860-00
KAIG3-RFI-PG-C-6859 00 KAIG3-RFI-PG-C-6859-00
KAIG3-RFI-EC-S-8568 00 KAIG3-RFI-EC-S-8568-00
KAIG3-RFI-WG-S-8567 00 KAIG3-RFI-WG-S-8567-00
KAIG3-RFI-EC-S-8566 00 KAIG3-RFI-EC-S-8566-00
KAIG3-RFI-EC-SU-2841 00 KAIG3-RFI-EC-SU-2841-00
KAIG3-RFI-SW-C-6887 00 KAIG3-RFI-SW-C-6887-00
KAIG3-RFI-SW-C-6877 00 KAIG3-RFI-SW-C-6877-00
KAIG3-RFI-SW-C-6886 00 KAIG3-RFI-SW-C-6886-00
KAIG3-RFI-SW-C-6876 00 KAIG3-RFI-SW-C-6876-00
KAIG3-RFI-SW-M-0273 00 KAIG3-RFI-SW-M-0273-00
KAIG3-RFI-SW-M-0272 00 KAIG3-RFI-SW-M-0272-00
KAIG3-RFI-SW-C-6878 00 KAIG3-RFI-SW-C-6878-00
KAIG3-RFI-SW-C-6875 00 KAIG3-RFI-SW-C-6875-00
KAIG3-RFI-SW-C-6874 00 KAIG3-RFI-SW-C-6874-00
KAIG3-RFI-SW-C-6873 00 KAIG3-RFI-SW-C-6873-00
KAIG3-RFI-SW-C-6872 00 KAIG3-RFI-SW-C-6872-00
KAIG3-RFI-SW-C-6869 00 KAIG3-RFI-SW-C-6869-00
KAIG3-RFI-SW-C-6868 00 KAIG3-RFI-SW-C-6868-00
KAIG3-RFI-SW-C-6867 00 KAIG3-RFI-SW-C-6867-00
KAIG3-RFI-SW-C-6866 00 KAIG3-RFI-SW-C-6866-00
KAIG3-RFI-SW-C-6865 00 KAIG3-RFI-SW-C-6865-00
KAIG3-RFI-SW-C-6864 00 KAIG3-RFI-SW-C-6864-00
KAIG3-RFI-SW-C-6863 00 KAIG3-RFI-SW-C-6863-00
KAIG3-RFI-DG-C-6855 00 KAIG3-RFI-DG-C-6855-00
KAIG3-RFI-WG-C-6854 00 KAIG3-RFI-WG-C-6854-00
KAIG3-RFI-WG-C-6853 00 KAIG3-RFI-WG-C-6853-00
KAIG3-RFI-WG-C-6852 00 KAIG3-RFI-WG-C-6852-00
KAIG3-RFI-WG-C-6851 00 KAIG3-RFI-WG-C-6851-00
KAIG3-RFI-EC-SU-2838 00 KAIG3-RFI-EC-SU-2838-00
KAIG3-RFI-EC-SU-2837 00 KAIG3-RFI-EC-SU-2837-00
KAIG3-RFI-EC-S-8557 00 KAIG3-RFI-EC-S-8557-00
KAIG3-RFI-EC-S-8556 00 KAIG3-RFI-EC-S-8556-00
KAIG3-RFI-EC-S-8555 00 KAIG3-RFI-EC-S-8555-00
KAIG3-RFI-EC-S-8554 00 KAIG3-RFI-EC-S-8554-00
KAIG3-RFI-WG-S-8542 00 KAIG3-RFI-WG-S-8542-00
KAIG3-RFI-TG-LS-1447 00 KAIG3-RFI-TG-LS-1447-00
KAIG3-RFI-DG-LS-1446 00 KAIG3-RFI-DG-LS-1446-00
KAIG3-RFI-PG-E-0535 00 KAIG3-RFI-PG-E-0535-00
KAIG3-RFI-SW-C-6835 00 KAIG3-RFI-SW-C-6835-00
KAIG3-RFI-SW-C-3010 01 KAIG3-RFI-SW-C-3010-01
KAIG3-RFI-SW-C-6856 00 KAIG3-RFI-SW-C-6856-00
KAIG3-RFI-SW-C-6850 00 KAIG3-RFI-SW-C-6850-00
KAIG3-RFI-SW-C-6849 00 KAIG3-RFI-SW-C-6849-00
KAIG3-RFI-SW-C-6848 00 KAIG3-RFI-SW-C-6848-00
KAIG3-RFI-SW-C-6847 00 KAIG3-RFI-SW-C-6847-00
KAIG3-RFI-SW-C-6846 00 KAIG3-RFI-SW-C-6846-00
KAIG3-RFI-SW-C-6845 00 KAIG3-RFI-SW-C-6845-00
KAIG3-RFI-SW-C-6844 00 KAIG3-RFI-SW-C-6844-00
KAIG3-RFI-SW-C-6843 00 KAIG3-RFI-SW-C-6843-00
KAIG3-RFI-SW-C-6840 00 KAIG3-RFI-SW-C-6840-00
KAIG3-RFI-SW-C-6836 00 KAIG3-RFI-SW-C-6836-00
KAIG3-RFI-SW-C-6834 00 KAIG3-RFI-SW-C-6834-00
KAIG3-RFI-SW-C-6833 00 KAIG3-RFI-SW-C-6833-00
KAIG3-RFI-SW-C-6832 00 KAIG3-RFI-SW-C-6832-00
KAIG3-RFI-SW-C-6831 00 KAIG3-RFI-SW-C-6831-00
KAIG3-RFI-SW-C-6830 00 KAIG3-RFI-SW-C-6830-00
KAIG3-RFI-SW-C-6829 00 KAIG3-RFI-SW-C-6829-00
KAIG3-RFI-SW-C-6828 00 KAIG3-RFI-SW-C-6828-00
KAIG3-RFI-SW-C-6827 00 KAIG3-RFI-SW-C-6827-00
KAIG3-RFI-SW-C-6826 00 KAIG3-RFI-SW-C-6826-00
KAIG3-RFI-SW-C-6825 00 KAIG3-RFI-SW-C-6825-00
KAIG3-RFI-SW-C-6824 00 KAIG3-RFI-SW-C-6824-00
KAIG3-RFI-SW-C-6810 00 KAIG3-RFI-SW-C-6810-00
KAIG3-RFI-SW-C-6783 00 KAIG3-RFI-SW-C-6783-00
KAIG3-RFI-SW-C-6782 00 KAIG3-RFI-SW-C-6782-00
KAIG3-RFI-SW-C-5261 01 KAIG3-RFI-SW-C-5261-01
KAIG3-RFI-SW-C-6677 00 KAIG3-RFI-SW-C-6677-00
KAIG3-RFI-SW-C-5073 01 KAIG3-RFI-SW-C-5073-01
KAIG3-RFI-SW-M-0271 00 KAIG3-RFI-SW-M-0271-00
KAIG3-RFI-SW-M-0270 00 KAIG3-RFI-SW-M-0270-00
KAIG3-RFI-PG-LS-1450 00 KAIG3-RFI-PG-LS-1450-00
KAIG3-RFI-SW-LS-1449 00 KAIG3-RFI-SW-LS-1449-00
KAIG3-RFI-CO-S-8040 00 KAIG3-RFI-CO-S-8040-00
KAIG3-RFI-CO-S-8560 00 KAIG3-RFI-CO-S-8560-00
KAIG3-RFI-CO-SU-2839 00 KAIG3-RFI-CO-SU-2839-00
KAIG3-RFI-CO-SU-2832 00 KAIG3-RFI-CO-SU-2832-00
KAIG3-RFI-CO-S-8551 00 KAIG3-RFI-CO-S-8551-00
KAIG3-RFI-CO-SU-2835 00 KAIG3-RFI-CO-SU-2835-00
KAIG3-RFI-CO-C-6842 00 KAIG3-RFI-CO-C-6842-00
KAIG3-RFI-CC-C-6857 00 KAIG3-RFI-CC-C-6857-00
KAIG3-RFI-MC-SU-2836 00 KAIG3-RFI-MC-SU-2836-00
KAIG3-RFI-CO-A-0992 00 KAIG3-RFI-CO-A-0992-00
KAIG3-RFI-MC-S-8552 00 KAIG3-RFI-MC-S-8552-00
KAIG3-RFI-CO-A-0991 00 KAIG3-RFI-CO-A-0991-00
KAIG3-RFI-MC-S-8553 00 KAIG3-RFI-MC-S-8553-00
KAIG3-RFI-CO-A-0990 00 KAIG3-RFI-CO-A-0990-00
KAIG3-RFI-CO-S-8541 00 KAIG3-RFI-CO-S-8541-00
KAIG3-RFI-CO-S-8540 00 KAIG3-RFI-CO-S-8540-00
KAIG3-RFI-CO-SU-2833 00 KAIG3-RFI-CO-SU-2833-00
KAIG3-RFI-CO-SU-2834 00 KAIG3-RFI-CO-SU-2834-00
KAIG3-RFI-MC-S-8520 00 KAIG3-RFI-MC-S-8520-00
KAIG3-RFI-VG-C-6858 00 KAIG3-RFI-VG-C-6858-00
KAIG3-RFI-CO-C-6773 00 KAIG3-RFI-CO-C-6773-00
KAIG3-RFI-CO-S-8279 00 KAIG3-RFI-CO-S-8279-00
KAIG3-RFI-CO-S-8512 00 KAIG3-RFI-CO-S-8512-00
KAIG3-RFI-PC-LC-0743 00 KAIG3-RFI-PC-LC-0743-00
KAIG3-RFI-PC-E-0534 00 KAIG3-RFI-PC-E-0534-00
KAIG3-RFI-SW-E-0474 01 KAIG3-RFI-SW-E-0474-01
KAIG3-RFI-SW-C-6747 00 KAIG3-RFI-SW-C-6747-00
KAIG3-RFI-SW-C-5075 01 KAIG3-RFI-SW-C-5075-01
KAIG3-RFI-TG-S-8085 00 KAIG3-RFI-TG-S-8085-00
KAIG3-RFI-TB-S-8526 00 KAIG3-RFI-TB-S-8526-00
KAIG3-RFI-WG-C-6839 00 KAIG3-RFI-WG-C-6839-00
KAIG3-RFI-WG-C-6838 00 KAIG3-RFI-WG-C-6838-00
KAIG3-RFI-DG-C-6837 00 KAIG3-RFI-DG-C-6837-00
KAIG3-RFI-SW-C-6239 00 KAIG3-RFI-SW-C-6239-00
KAIG3-RFI-SW-C-6210 00 KAIG3-RFI-SW-C-6210-00
KAIG3-RFI-WG-C-6796 00 KAIG3-RFI-WG-C-6796-00
KAIG3-RFI-WG-C-6795 00 KAIG3-RFI-WG-C-6795-00
KAIG3-RFI-PT-A-0996 00 KAIG3-RFI-PT-A-0996-00
KAIG3-RFI-ZG-C-6811-00 00 KAIG3-RFI-ZG-C-6811-00-00
KAIG3-RFI-WG-C-6794 00 KAIG3-RFI-WG-C-6794-00
KAIG3-RFI-ZG-C-6805 00 KAIG3-RFI-ZG-C-6805-00
KAIG3-RFI-WG-C-6801 00 KAIG3-RFI-WG-C-6801-00
KAIG3-RFI-MC-S-8537 00 KAIG3-RFI-MC-S-8537-00
KAIG3-RFI-CO-S-7670 00 KAIG3-RFI-CO-S-7670-00
KAIG3-RFI-WG-C-6797 00 KAIG3-RFI-WG-C-6797-00
KAIG3-RFI-SW-C-6823 00 KAIG3-RFI-SW-C-6823-00
KAIG3-RFI-MC-S-8521 00 KAIG3-RFI-MC-S-8521-00
KAIG3-RFI-SW-C-6822 00 KAIG3-RFI-SW-C-6822-00
KAIG3-RFI-WG-S-8536 00 KAIG3-RFI-WG-S-8536-00
KAIG3-RFI-WG-S-8535-00 00 KAIG3-RFI-WG-S-8535-00-00
KAIG3-RFI-CO-S-8538 00 KAIG3-RFI-CO-S-8538-00
KAIG3-RFI-CO-S-8539 00 KAIG3-RFI-CO-S-8539-00
KAIG3-RFI-CO-S-8433 00 KAIG3-RFI-CO-S-8433-00
KAIG3-RFI-CO-C-6820 00 KAIG3-RFI-CO-C-6820-00
KAIG3-RFI-CF-C-6813 00 KAIG3-RFI-CF-C-6813-00
KAIG3-RFI-CO-C-6812 00 KAIG3-RFI-CO-C-6812-00
KAIG3-RFI-CF-C-6814 00 KAIG3-RFI-CF-C-6814-00
KAIG3-RFI-CO-C-6819 00 KAIG3-RFI-CO-C-6819-00
KAIG3-RFI-MC-C-6816 00 KAIG3-RFI-MC-C-6816-00
KAIG3-RFI-CC-C-6821 00 KAIG3-RFI-CC-C-6821-00
KAIG3-RFI-CO-C-6841 00 KAIG3-RFI-CO-C-6841-00
KAIG3-RFI-SW-C-5359 01 KAIG3-RFI-SW-C-5359-01
KAIG3-RFI-SW-C-5295 01 KAIG3-RFI-SW-C-5295-01
KAIG3-RFI-SW-C-5255 01 KAIG3-RFI-SW-C-5255-01
KAIG3-RFI-SW-C-5307 01 KAIG3-RFI-SW-C-5307-01
KAIG3-RFI-SW-LS-1445 00 KAIG3-RFI-SW-LS-1445-00
KAIG3-RFI-SW-C-6809 00 KAIG3-RFI-SW-C-6809-00
KAIG3-RFI-SW-C-6808 00 KAIG3-RFI-SW-C-6808-00
KAIG3-RFI-SW-C-6807 00 KAIG3-RFI-SW-C-6807-00
KAIG3-RFI-SW-C-6806 00 KAIG3-RFI-SW-C-6806-00
KAIG3-RFI-SW-C-6804 00 KAIG3-RFI-SW-C-6804-00
KAIG3-RFI-SW-C-6803 00 KAIG3-RFI-SW-C-6803-00
KAIG3-RFI-SW-C-6799 00 KAIG3-RFI-SW-C-6799-00
KAIG3-RFI-SW-C-6798 00 KAIG3-RFI-SW-C-6798-00
KAIG3-RFI-SW-C-6784 00 KAIG3-RFI-SW-C-6784-00
KAIG3-RFI-SW-C-6780 00 KAIG3-RFI-SW-C-6780-00
KAIG3-RFI-SW-C-6779 00 KAIG3-RFI-SW-C-6779-00
KAIG3-RFI-SG-C-6793 00 KAIG3-RFI-SG-C-6793-00
KAIG3-RFI-SG-C-6789 00 KAIG3-RFI-SG-C-6789-00
KAIG3-RFI-WG-C-6788 00 KAIG3-RFI-WG-C-6788-00
KAIG3-RFI-WG-C-6787 00 KAIG3-RFI-WG-C-6787-00
KAIG3-RFI-WG-C-6786 00 KAIG3-RFI-WG-C-6786-00
KAIG3-RFI-TG-C-6785 00 KAIG3-RFI-TG-C-6785-00
KAIG3-RFI-TB-SU-2828 00 KAIG3-RFI-TB-SU-2828-00
KAIG3-RFI-PG-SU-2827 00 KAIG3-RFI-PG-SU-2827-00
KAIG3-RFI-EC-SU-2826 00 KAIG3-RFI-EC-SU-2826-00
KAIG3-RFI-EC-SU-2825 00 KAIG3-RFI-EC-SU-2825-00
KAIG3-RFI-PG-S-8525 00 KAIG3-RFI-PG-S-8525-00
KAIG3-RFI-EC-S-8524 00 KAIG3-RFI-EC-S-8524-00
KAIG3-RFI-EC-S-8523 00 KAIG3-RFI-EC-S-8523-00
KAIG3-RFI-EC-S-8522 00 KAIG3-RFI-EC-S-8522-00
KAIG3-RFI-WG-C-6758 00 KAIG3-RFI-WG-C-6758-00
KAIG3-RFI-WG-C-6757 00 KAIG3-RFI-WG-C-6757-00
KAIG3-RFI-PC-LC-0740 00 KAIG3-RFI-PC-LC-0740-00
KAIG3-RFI-PC-E-0533 00 KAIG3-RFI-PC-E-0533-00
KAIG3-RFI-NA-LC-0742 00 KAIG3-RFI-NA-LC-0742-00
KAIG3-RFI-PC-E-0532 00 KAIG3-RFI-PC-E-0532-00
KAIG3-RFI-NA-LC-0741 00 KAIG3-RFI-NA-LC-0741-00
KAIG3-RFI-SW-LS-1444 00 KAIG3-RFI-SW-LS-1444-00
KAIG3-RFI-SW-LS-1443 00 KAIG3-RFI-SW-LS-1443-00
KAIG3-RFI-SW-C-6445 02 KAIG3-RFI-SW-C-6445-02
KAIG3-RFI-SW-C-6446 02 KAIG3-RFI-SW-C-6446-02
KAIG3-RFI-CO-SS-0391 00 KAIG3-RFI-CO-SS-0391-00
KAIG3-RFI-CO-SS-0389 00 KAIG3-RFI-CO-SS-0389-00
KAIG3-RFI-CO-SS-0388 00 KAIG3-RFI-CO-SS-0388-00
KAIG3-RFI-CO-SS-0387 00 KAIG3-RFI-CO-SS-0387-00
KAIG3-RFI-MB-SS-0386 00 KAIG3-RFI-MB-SS-0386-00
KAIG3-RFI-CO-SS-0385 00 KAIG3-RFI-CO-SS-0385-00
KAIG3-RFI-CO-SS-0384 00 KAIG3-RFI-CO-SS-0384-00
KAIG3-RFI-CO-SS-0383 00 KAIG3-RFI-CO-SS-0383-00
KAIG3-RFI-CO-SS-0381 00 KAIG3-RFI-CO-SS-0381-00
KAIG3-RFI-CO-SS-0380 00 KAIG3-RFI-CO-SS-0380-00
KAIG3-RFI-CO-SS-0377 00 KAIG3-RFI-CO-SS-0377-00
KAIG3-RFI-CO-SS-0375 00 KAIG3-RFI-CO-SS-0375-00
KAIG3-RFI-CO-SS-0374 00 KAIG3-RFI-CO-SS-0374-00
KAIG3-RFI-CO-SS-0373 00 KAIG3-RFI-CO-SS-0373-00
KAIG3-RFI-CO-SS-0372 00 KAIG3-RFI-CO-SS-0372-00
KAIG3-RFI-CO-SS-0371 00 KAIG3-RFI-CO-SS-0371-00
KAIG3-RFI-CO-SS-0370 00 KAIG3-RFI-CO-SS-0370-00
KAIG3-RFI-CO-SS-0369 00 KAIG3-RFI-CO-SS-0369-00
KAIG3-RFI-SW-C-6781 00 KAIG3-RFI-SW-C-6781-00
KAIG3-RFI-SW-C-6778 00 KAIG3-RFI-SW-C-6778-00
KAIG3-RFI-SW-C-6777 00 KAIG3-RFI-SW-C-6777-00
KAIG3-RFI-SW-C-6776 00 KAIG3-RFI-SW-C-6776-00
KAIG3-RFI-SW-C-6775 00 KAIG3-RFI-SW-C-6775-00
KAIG3-RFI-SW-C-6774 00 KAIG3-RFI-SW-C-6774-00
KAIG3-RFI-SW-C-5999 00 KAIG3-RFI-SW-C-5999-00
KAIG3-RFI-SW-C-5725 00 KAIG3-RFI-SW-C-5725-00
KAIG3-RFI-CO-C-6792 00 KAIG3-RFI-CO-C-6792-00
KAIG3-RFI-CO-C-6756 00 KAIG3-RFI-CO-C-6756-00
KAIG3-RFI-MC-S-8519 00 KAIG3-RFI-MC-S-8519-00
KAIG3-RFI-MC-S-8518 00 KAIG3-RFI-MC-S-8518-00
KAIG3-RFI-MC-S-8496 00 KAIG3-RFI-MC-S-8496-00
KAIG3-RFI-CO-SU-2830 00 KAIG3-RFI-CO-SU-2830-00
KAIG3-RFI-CO-S-8530 00 KAIG3-RFI-CO-S-8530-00
KAIG3-RFI-MC-S-8419 00 KAIG3-RFI-MC-S-8419-00
KAIG3-RFI-CO-S-8533 00 KAIG3-RFI-CO-S-8533-00
KAIG3-RFI-CO-S-8532 00 KAIG3-RFI-CO-S-8532-00
KAIG3-RFI-CO-SU-2831 00 KAIG3-RFI-CO-SU-2831-00
KAIG3-RFI-PC-S-8529 00 KAIG3-RFI-PC-S-8529-00
KAIG3-RFI-PC-SU-2829 00 KAIG3-RFI-PC-SU-2829-00
KAIG3-RFI-PC-S-8528 00 KAIG3-RFI-PC-S-8528-00
KAIG3-RFI-CO-S-8507 00 KAIG3-RFI-CO-S-8507-00
KAIG3-RFI-CO-SU-2821 00 KAIG3-RFI-CO-SU-2821-00
KAIG3-RFI-CO-S-8516 00 KAIG3-RFI-CO-S-8516-00
KAIG3-RFI-CO-S-8517 00 KAIG3-RFI-CO-S-8517-00
KAIG3-RFI-CO-S-8515 00 KAIG3-RFI-CO-S-8515-00
KAIG3-RFI-CO-S-8514 00 KAIG3-RFI-CO-S-8514-00
KAIG3-RFI-CO-S-8513 00 KAIG3-RFI-CO-S-8513-00
KAIG3-RFI-CO-SU-2824 00 KAIG3-RFI-CO-SU-2824-00
KAIG3-RFI-CO-SU-2823 00 KAIG3-RFI-CO-SU-2823-00
KAIG3-RFI-SW-C-6772 00 KAIG3-RFI-SW-C-6772-00
KAIG3-RFI-SW-C-6752 00 KAIG3-RFI-SW-C-6752-00
KAIG3-RFI-SW-C-6771 00 KAIG3-RFI-SW-C-6771-00
KAIG3-RFI-SW-C-6751 00 KAIG3-RFI-SW-C-6751-00
KAIG3-RFI-PC-E-0530 00 KAIG3-RFI-PC-E-0530-00
KAIG3-RFI-WG-P-0269 00 KAIG3-RFI-WG-P-0269-00
KAIG3-RFI-SW-C-6760 00 KAIG3-RFI-SW-C-6760-00
KAIG3-RFI-SW-C-6759 00 KAIG3-RFI-SW-C-6759-00
KAIG3-RFI-SW-C-6770 00 KAIG3-RFI-SW-C-6770-00
KAIG3-RFI-SW-C-6769 00 KAIG3-RFI-SW-C-6769-00
KAIG3-RFI-SW-C-6768 00 KAIG3-RFI-SW-C-6768-00
KAIG3-RFI-SW-C-6767 00 KAIG3-RFI-SW-C-6767-00
KAIG3-RFI-SW-C-6766 00 KAIG3-RFI-SW-C-6766-00
KAIG3-RFI-SW-C-6765 00 KAIG3-RFI-SW-C-6765-00
KAIG3-RFI-SW-C-6764 00 KAIG3-RFI-SW-C-6764-00
KAIG3-RFI-SW-C-6763 00 KAIG3-RFI-SW-C-6763-00
KAIG3-RFI-SW-C-6762 00 KAIG3-RFI-SW-C-6762-00
KAIG3-RFI-SW-C-6761 00 KAIG3-RFI-SW-C-6761-00
KAIG3-RFI-SW-C-6750 00 KAIG3-RFI-SW-C-6750-00
KAIG3-RFI-SW-C-6749 00 KAIG3-RFI-SW-C-6749-00
KAIG3-RFI-SW-C-6748 00 KAIG3-RFI-SW-C-6748-00
KAIG3-RFI-SW-C-6711 00 KAIG3-RFI-SW-C-6711-00
KAIG3-RFI-SW-C-6561 01 KAIG3-RFI-SW-C-6561-01
KAIG3-RFI-CO-C-6755 00 KAIG3-RFI-CO-C-6755-00
KAIG3-RFI-MC-C-6754 00 KAIG3-RFI-MC-C-6754-00
KAIG3-RFI-CF-C-6753 00 KAIG3-RFI-CF-C-6753-00
KAIG3-RFI-MC-S-8460 00 KAIG3-RFI-MC-S-8460-00
KAIG3-RFI-CO-S-8497 00 KAIG3-RFI-CO-S-8497-00
KAIG3-RFI-CO-S-8062 00 KAIG3-RFI-CO-S-8062-00
KAIG3-RFI-CO-S-8509 00 KAIG3-RFI-CO-S-8509-00
KAIG3-RFI-CO-S-7960 00 KAIG3-RFI-CO-S-7960-00
KAIG3-RFI-CO-S-8505 00 KAIG3-RFI-CO-S-8505-00
KAIG3-RFI-CO-S-8176 00 KAIG3-RFI-CO-S-8176-00
KAIG3-RFI-CO-S-8474 00 KAIG3-RFI-CO-S-8474-00
KAIG3-RFI-WG-A-0989 00 KAIG3-RFI-WG-A-0989-00
KAIG3-RFI-CO-SU-2820 00 KAIG3-RFI-CO-SU-2820-00
KAIG3-RFI-CO-S-7870 00 KAIG3-RFI-CO-S-7870-00
KAIG3-RFI-CF-S-8510 00 KAIG3-RFI-CF-S-8510-00
KAIG3-RFI-CF-SU-2822 00 KAIG3-RFI-CF-SU-2822-00
KAIG3-RFI-CF-S-8504 00 KAIG3-RFI-CF-S-8504-00
KAIG3-RFI-CF-S-8501 00 KAIG3-RFI-CF-S-8501-00
KAIG3-RFI-SG-A-0988 00 KAIG3-RFI-SG-A-0988-00
KAIG3-RFI-CF-S-8503 00 KAIG3-RFI-CF-S-8503-00
KAIG3-RFI-CF-SU-2819 00 KAIG3-RFI-CF-SU-2819-00
KAIG3-RFI-CF-SU-2818 00 KAIG3-RFI-CF-SU-2818-00
KAIG3-RFI-CO-S-8035 01 KAIG3-RFI-CO-S-8035-01
KAIG3-RFI-TG-A-0987 00 KAIG3-RFI-TG-A-0987-00
KAIG3-RFI-SM-SU-2817 00 KAIG3-RFI-SM-SU-2817-00
KAIG3-RFI-PG-A-0986 00 KAIG3-RFI-PG-A-0986-00
KAIG3-RFI-SM-S-8498 00 KAIG3-RFI-SM-S-8498-00
KAIG3-RFI-SM-S-8499 00 KAIG3-RFI-SM-S-8499-00
KAIG3-RFI-ZG-C-6742 00 KAIG3-RFI-ZG-C-6742-00
KAIG3-RFI-AG-S-8489 00 KAIG3-RFI-AG-S-8489-00
KAIG3-RFI-WG-S-8488 00 KAIG3-RFI-WG-S-8488-00
KAIG3-RFI-EC-S-8487 00 KAIG3-RFI-EC-S-8487-00
KAIG3-RFI-EC-SU-2816 00 KAIG3-RFI-EC-SU-2816-00
KAIG3-RFI-CF-LC-0736 00 KAIG3-RFI-CF-LC-0736-00
KAIG3-RFI-PC-LC-0739 00 KAIG3-RFI-PC-LC-0739-00
KAIG3-RFI-SW-LC-0735 00 KAIG3-RFI-SW-LC-0735-00
KAIG3-RFI-SW-LC-0734 00 KAIG3-RFI-SW-LC-0734-00
KAIG3-RFI-CF-P-0268 00 KAIG3-RFI-CF-P-0268-00
KAIG3-RFI-SW-C-6740 00 KAIG3-RFI-SW-C-6740-00
KAIG3-RFI-SW-C-6739 00 KAIG3-RFI-SW-C-6739-00
KAIG3-RFI-SW-C-6730 00 KAIG3-RFI-SW-C-6730-00
KAIG3-RFI-SW-C-6729 00 KAIG3-RFI-SW-C-6729-00
KAIG3-RFI-SW-LS-1442 00 KAIG3-RFI-SW-LS-1442-00
KAIG3-RFI-SW-C-6728 00 KAIG3-RFI-SW-C-6728-00
KAIG3-RFI-SW-C-6727 00 KAIG3-RFI-SW-C-6727-00
KAIG3-RFI-SW-LS-1441 00 KAIG3-RFI-SW-LS-1441-00
KAIG3-RFI-SW-C-6726 00 KAIG3-RFI-SW-C-6726-00
KAIG3-RFI-SW-C-6725 00 KAIG3-RFI-SW-C-6725-00
KAIG3-RFI-SW-C-6746 00 KAIG3-RFI-SW-C-6746-00
KAIG3-RFI-SW-C-6745 00 KAIG3-RFI-SW-C-6745-00
KAIG3-RFI-SW-C-6682 00 KAIG3-RFI-SW-C-6682-00
KAIG3-RFI-CO-S-8491 00 KAIG3-RFI-CO-S-8491-00
KAIG3-RFI-CF-S-8500 00 KAIG3-RFI-CF-S-8500-00
KAIG3-RFI-CO-S-8473 00 KAIG3-RFI-CO-S-8473-00
KAIG3-RFI-CO-SU-2814 00 KAIG3-RFI-CO-SU-2814-00
KAIG3-RFI-CO-S-8490 00 KAIG3-RFI-CO-S-8490-00
KAIG3-RFI-CO-S-8495 00 KAIG3-RFI-CO-S-8495-00
KAIG3-RFI-CO-C-6671 00 KAIG3-RFI-CO-C-6671-00
KAIG3-RFI-CO-SU-2789 00 KAIG3-RFI-CO-SU-2789-00
KAIG3-RFI-CC-C-6744 00 KAIG3-RFI-CC-C-6744-00
KAIG3-RFI-CO-C-6741 00 KAIG3-RFI-CO-C-6741-00
KAIG3-RFI-CO-C-5851 00 KAIG3-RFI-CO-C-5851-00
KAIG3-RFI-CF-S-8494 00 KAIG3-RFI-CF-S-8494-00
KAIG3-RFI-CF-S-8493 00 KAIG3-RFI-CF-S-8493-00
KAIG3-RFI-CF-S-8486 00 KAIG3-RFI-CF-S-8486-00
KAIG3-RFI-CF-S-8485 00 KAIG3-RFI-CF-S-8485-00
KAIG3-RFI-CF-S-8481 00 KAIG3-RFI-CF-S-8481-00
KAIG3-RFI-CF-S-8483 00 KAIG3-RFI-CF-S-8483-00
KAIG3-RFI-CF-S-8484 00 KAIG3-RFI-CF-S-8484-00
KAIG3-RFI-CF-S-8479 00 KAIG3-RFI-CF-S-8479-00
KAIG3-RFI-CF-S-8482 00 KAIG3-RFI-CF-S-8482-00
KAIG3-RFI-CF-S-8480 00 KAIG3-RFI-CF-S-8480-00
KAIG3-RFI-CF-S-8478 00 KAIG3-RFI-CF-S-8478-00
KAIG3-RFI-CF-S-8492 00 KAIG3-RFI-CF-S-8492-00
KAIG3-RFI-VG-C-6675 00 KAIG3-RFI-VG-C-6675-00
KAIG3-RFI-ZG-C-6735 00 KAIG3-RFI-ZG-C-6735-00
KAIG3-RFI-ZG-C-6734 00 KAIG3-RFI-ZG-C-6734-00
KAIG3-RFI-SW-LS-1440 00 KAIG3-RFI-SW-LS-1440-00
KAIG3-RFI-SW-C-6724 00 KAIG3-RFI-SW-C-6724-00
KAIG3-RFI-SW-C-6718 00 KAIG3-RFI-SW-C-6718-00
KAIG3-RFI-SW-C-6710 00 KAIG3-RFI-SW-C-6710-00
KAIG3-RFI-CO-SU-2797 00 KAIG3-RFI-CO-SU-2797-00
KAIG3-RFI-ZG-C-6733 00 KAIG3-RFI-ZG-C-6733-00
KAIG3-RFI-EC-SU-2812 00 KAIG3-RFI-EC-SU-2812-00
KAIG3-RFI-MB-A-0985 00 KAIG3-RFI-MB-A-0985-00
KAIG3-RFI-EC-S-8467 00 KAIG3-RFI-EC-S-8467-00
KAIG3-RFI-CO-S-8420 00 KAIG3-RFI-CO-S-8420-00
KAIG3-RFI-TG-S-8449 00 KAIG3-RFI-TG-S-8449-00
KAIG3-RFI-CO-S-7860 01 KAIG3-RFI-CO-S-7860-01
KAIG3-RFI-CO-S-7705 01 KAIG3-RFI-CO-S-7705-01
KAIG3-RFI-SW-C-6738 00 KAIG3-RFI-SW-C-6738-00
KAIG3-RFI-SW-C-6737 00 KAIG3-RFI-SW-C-6737-00
KAIG3-RFI-SW-C-6731 00 KAIG3-RFI-SW-C-6731-00
KAIG3-RFI-SW-C-6732 00 KAIG3-RFI-SW-C-6732-00
KAIG3-RFI-CO-SS-0382 00 KAIG3-RFI-CO-SS-0382-00
KAIG3-RFI-CO-C-6723 00 KAIG3-RFI-CO-C-6723-00
KAIG3-RFI-CO-S-8463 00 KAIG3-RFI-CO-S-8463-00
KAIG3-RFI-CO-S-8464 00 KAIG3-RFI-CO-S-8464-00
KAIG3-RFI-CO-SU-2809 00 KAIG3-RFI-CO-SU-2809-00
KAIG3-RFI-CO-C-6736 00 KAIG3-RFI-CO-C-6736-00
KAIG3-RFI-PC-S-8462 00 KAIG3-RFI-PC-S-8462-00
KAIG3-RFI-PC-S-8461 00 KAIG3-RFI-PC-S-8461-00
KAIG3-RFI-PC-SU-2808 00 KAIG3-RFI-PC-SU-2808-00
KAIG3-RFI-CO-S-8335 00 KAIG3-RFI-CO-S-8335-00
KAIG3-RFI-CO-S-8336 00 KAIG3-RFI-CO-S-8336-00
KAIG3-RFI-CO-S-8334 00 KAIG3-RFI-CO-S-8334-00
KAIG3-RFI-PG-C-6722 00 KAIG3-RFI-PG-C-6722-00
KAIG3-RFI-WG-C-6701 00 KAIG3-RFI-WG-C-6701-00
KAIG3-RFI-PG-C-6700 00 KAIG3-RFI-PG-C-6700-00
KAIG3-RFI-PG-C-6699 00 KAIG3-RFI-PG-C-6699-00
KAIG3-RFI-TG-C-6698 00 KAIG3-RFI-TG-C-6698-00
KAIG3-RFI-WG-C-6697 00 KAIG3-RFI-WG-C-6697-00
KAIG3-RFI-WG-C-6696 00 KAIG3-RFI-WG-C-6696-00
KAIG3-RFI-CO-SU-2811 00 KAIG3-RFI-CO-SU-2811-00
KAIG3-RFI-CO-S-8477 00 KAIG3-RFI-CO-S-8477-00
KAIG3-RFI-CO-SU-2815 00 KAIG3-RFI-CO-SU-2815-00
KAIG3-RFI-CO-S-8469 00 KAIG3-RFI-CO-S-8469-00
KAIG3-RFI-CO-S-8476 00 KAIG3-RFI-CO-S-8476-00
KAIG3-RFI-WG-S-8448 00 KAIG3-RFI-WG-S-8448-00
KAIG3-RFI-CO-S-8475 00 KAIG3-RFI-CO-S-8475-00
KAIG3-RFI-PG-S-8447 00 KAIG3-RFI-PG-S-8447-00
KAIG3-RFI-CO-S-8468 00 KAIG3-RFI-CO-S-8468-00
KAIG3-RFI-CO-S-8470 00 KAIG3-RFI-CO-S-8470-00
KAIG3-RFI-WG-S-8438 00 KAIG3-RFI-WG-S-8438-00
KAIG3-RFI-CO-SU-2781 00 KAIG3-RFI-CO-SU-2781-00
KAIG3-RFI-TB-S-8437 00 KAIG3-RFI-TB-S-8437-00
KAIG3-RFI-SM-S-8465 00 KAIG3-RFI-SM-S-8465-00
KAIG3-RFI-SM-SU-2810 00 KAIG3-RFI-SM-SU-2810-00
KAIG3-RFI-SM-S-8466 00 KAIG3-RFI-SM-S-8466-00
KAIG3-RFI-CF-S-8451 00 KAIG3-RFI-CF-S-8451-00
KAIG3-RFI-EC-S-8436 00 KAIG3-RFI-EC-S-8436-00
KAIG3-RFI-EC-S-8424 00 KAIG3-RFI-EC-S-8424-00
KAIG3-RFI-EC-SU-2802 00 KAIG3-RFI-EC-SU-2802-00
KAIG3-RFI-MC-SU-2807 00 KAIG3-RFI-MC-SU-2807-00
KAIG3-RFI-MC-S-8459 00 KAIG3-RFI-MC-S-8459-00
KAIG3-RFI-MC-S-8439 00 KAIG3-RFI-MC-S-8439-00
KAIG3-RFI-CO-SU-2813 00 KAIG3-RFI-CO-SU-2813-00
KAIG3-RFI-CO-S-8471 00 KAIG3-RFI-CO-S-8471-00
KAIG3-RFI-CO-SU-2806 00 KAIG3-RFI-CO-SU-2806-00
KAIG3-RFI-CO-SU-2800 00 KAIG3-RFI-CO-SU-2800-00
KAIG3-RFI-CO-S-8434 00 KAIG3-RFI-CO-S-8434-00
KAIG3-RFI-CO-S-8455 00 KAIG3-RFI-CO-S-8455-00
KAIG3-RFI-CO-S-8456 00 KAIG3-RFI-CO-S-8456-00
KAIG3-RFI-CO-S-8453 00 KAIG3-RFI-CO-S-8453-00
KAIG3-RFI-CO-SU-2805 00 KAIG3-RFI-CO-SU-2805-00
KAIG3-RFI-CO-S-8452 00 KAIG3-RFI-CO-S-8452-00
KAIG3-RFI-CO-S-8443 00 KAIG3-RFI-CO-S-8443-00
KAIG3-RFI-CO-SU-2801 00 KAIG3-RFI-CO-SU-2801-00
KAIG3-RFI-CO-S-8428 00 KAIG3-RFI-CO-S-8428-00
KAIG3-RFI-CO-S-8432 00 KAIG3-RFI-CO-S-8432-00
KAIG3-RFI-CO-S-8408 00 KAIG3-RFI-CO-S-8408-00
KAIG3-RFI-CO-S-8429 00 KAIG3-RFI-CO-S-8429-00
KAIG3-RFI-CO-S-8430 00 KAIG3-RFI-CO-S-8430-00
KAIG3-RFI-CO-S-8427 00 KAIG3-RFI-CO-S-8427-00
KAIG3-RFI-ZG-LC-0725 01 KAIG3-RFI-ZG-LC-0725-01
KAIG3-RFI-CO-S-8426 00 KAIG3-RFI-CO-S-8426-00
KAIG3-RFI-CO-S-8435 00 KAIG3-RFI-CO-S-8435-00
KAIG3-RFI-MB-E-0528 00 KAIG3-RFI-MB-E-0528-00
KAIG3-RFI-MB-E-0527 00 KAIG3-RFI-MB-E-0527-00
KAIG3-RFI-MB-E-0526 00 KAIG3-RFI-MB-E-0526-00
KAIG3-RFI-SM-E-0525 00 KAIG3-RFI-SM-E-0525-00
KAIG3-RFI-ZG-E-0524 00 KAIG3-RFI-ZG-E-0524-00
KAIG3-RFI-BO-E-0511 01 KAIG3-RFI-BO-E-0511-01
KAIG3-RFI-TB-LC-0733 00 KAIG3-RFI-TB-LC-0733-00
KAIG3-RFI-TB-LC-0732 00 KAIG3-RFI-TB-LC-0732-00
KAIG3-RFI-NA-LC-0728 00 KAIG3-RFI-NA-LC-0728-00
KAIG3-RFI-NA-LC-0727 00 KAIG3-RFI-NA-LC-0727-00
KAIG3-RFI-CO-S-8139 00 KAIG3-RFI-CO-S-8139-00
KAIG3-RFI-RG-C-6396 00 KAIG3-RFI-RG-C-6396-00
KAIG3-RFI-CO-A-0971 00 KAIG3-RFI-CO-A-0971-00
KAIG3-RFI-MC-S-8441 00 KAIG3-RFI-MC-S-8441-00
KAIG3-RFI-CO-A-0972 00 KAIG3-RFI-CO-A-0972-00
KAIG3-RFI-CO-A-0978 00 KAIG3-RFI-CO-A-0978-00
KAIG3-RFI-CO-A-0975 00 KAIG3-RFI-CO-A-0975-00
KAIG3-RFI-CO-A-0974 00 KAIG3-RFI-CO-A-0974-00
KAIG3-RFI-CO-A-0970 00 KAIG3-RFI-CO-A-0970-00
KAIG3-RFI-SW-C-6717 00 KAIG3-RFI-SW-C-6717-00
KAIG3-RFI-SW-C-6716 00 KAIG3-RFI-SW-C-6716-00
KAIG3-RFI-SW-C-6715 00 KAIG3-RFI-SW-C-6715-00
KAIG3-RFI-SW-C-6714 00 KAIG3-RFI-SW-C-6714-00
KAIG3-RFI-SW-C-6713 00 KAIG3-RFI-SW-C-6713-00
KAIG3-RFI-SW-C-6709 00 KAIG3-RFI-SW-C-6709-00
KAIG3-RFI-SW-C-6708 00 KAIG3-RFI-SW-C-6708-00
KAIG3-RFI-SW-C-6707 00 KAIG3-RFI-SW-C-6707-00
KAIG3-RFI-SW-C-6706 00 KAIG3-RFI-SW-C-6706-00
KAIG3-RFI-SW-C-6690 00 KAIG3-RFI-SW-C-6690-00
KAIG3-RFI-SW-C-6685 00 KAIG3-RFI-SW-C-6685-00
KAIG3-RFI-SW-C-6684 00 KAIG3-RFI-SW-C-6684-00
KAIG3-RFI-SW-C-6683 00 KAIG3-RFI-SW-C-6683-00
KAIG3-RFI-SW-C-6485 01 KAIG3-RFI-SW-C-6485-01
KAIG3-RFI-SW-C-5260 01 KAIG3-RFI-SW-C-5260-01
KAIG3-RFI-MC-S-8440 00 KAIG3-RFI-MC-S-8440-00
KAIG3-RFI-MC-SU-2803 00 KAIG3-RFI-MC-SU-2803-00
KAIG3-RFI-CO-S-8445 00 KAIG3-RFI-CO-S-8445-00
KAIG3-RFI-CO-SU-2804 00 KAIG3-RFI-CO-SU-2804-00
KAIG3-RFI-CO-S-8444 00 KAIG3-RFI-CO-S-8444-00
KAIG3-RFI-CO-S-8450 00 KAIG3-RFI-CO-S-8450-00
KAIG3-RFI-CF-C-6702 00 KAIG3-RFI-CF-C-6702-00
KAIG3-RFI-MC-C-6703 00 KAIG3-RFI-MC-C-6703-00
KAIG3-RFI-MC-C-6712 00 KAIG3-RFI-MC-C-6712-00
KAIG3-RFI-CO-C-6719 00 KAIG3-RFI-CO-C-6719-00
KAIG3-RFI-MC-C-6720 00 KAIG3-RFI-MC-C-6720-00
KAIG3-RFI-MC-C-6704 00 KAIG3-RFI-MC-C-6704-00
KAIG3-RFI-SW-M-0267 00 KAIG3-RFI-SW-M-0267-00
KAIG3-RFI-CO-C-6705 00 KAIG3-RFI-CO-C-6705-00
KAIG3-RFI-SW-LS-1439 00 KAIG3-RFI-SW-LS-1439-00
KAIG3-RFI-CF-C-6721 00 KAIG3-RFI-CF-C-6721-00
KAIG3-RFI-CO-A-0977 00 KAIG3-RFI-CO-A-0977-00
KAIG3-RFI-CO-A-0967 00 KAIG3-RFI-CO-A-0967-00
KAIG3-RFI-CO-A-0973 00 KAIG3-RFI-CO-A-0973-00
KAIG3-RFI-CO-A-0969 00 KAIG3-RFI-CO-A-0969-00
KAIG3-RFI-CO-A-0968 00 KAIG3-RFI-CO-A-0968-00
KAIG3-RFI-CO-A-0976 00 KAIG3-RFI-CO-A-0976-00
KAIG3-RFI-MC-S-8250 00 KAIG3-RFI-MC-S-8250-00
KAIG3-RFI-SW-C-6676 00 KAIG3-RFI-SW-C-6676-00
KAIG3-RFI-SW-C-6679 00 KAIG3-RFI-SW-C-6679-00
KAIG3-RFI-MB-A-0984 00 KAIG3-RFI-MB-A-0984-00
KAIG3-RFI-EC-S-8423 00 KAIG3-RFI-EC-S-8423-00
KAIG3-RFI-EC-S-8422 00 KAIG3-RFI-EC-S-8422-00
KAIG3-RFI-EC-SU-2799 00 KAIG3-RFI-EC-SU-2799-00
KAIG3-RFI-WG-SU-2798 00 KAIG3-RFI-WG-SU-2798-00
KAIG3-RFI-WG-C-6695 00 KAIG3-RFI-WG-C-6695-00
KAIG3-RFI-SG-C-6694 00 KAIG3-RFI-SG-C-6694-00
KAIG3-RFI-SG-C-6693 00 KAIG3-RFI-SG-C-6693-00
KAIG3-RFI-WG-C-6692 00 KAIG3-RFI-WG-C-6692-00
KAIG3-RFI-WG-C-6691 00 KAIG3-RFI-WG-C-6691-00
KAIG3-RFI-MC-S-8251 00 KAIG3-RFI-MC-S-8251-00
KAIG3-RFI-MC-S-8314 00 KAIG3-RFI-MC-S-8314-00
KAIG3-RFI-PC-S-8315 00 KAIG3-RFI-PC-S-8315-00
KAIG3-RFI-SW-C-6689 00 KAIG3-RFI-SW-C-6689-00
KAIG3-RFI-SW-C-6688 00 KAIG3-RFI-SW-C-6688-00
KAIG3-RFI-SW-C-6687 00 KAIG3-RFI-SW-C-6687-00
KAIG3-RFI-LM-SU-2747 00 KAIG3-RFI-LM-SU-2747-00
KAIG3-RFI-SW-C-6686 00 KAIG3-RFI-SW-C-6686-00
KAIG3-RFI-SW-C-6681 00 KAIG3-RFI-SW-C-6681-00
KAIG3-RFI-SW-C-6680 00 KAIG3-RFI-SW-C-6680-00
KAIG3-RFI-SW-C-6678 00 KAIG3-RFI-SW-C-6678-00
KAIG3-RFI-CO-S-8322 00 KAIG3-RFI-CO-S-8322-00
KAIG3-RFI-SW-C-6665 00 KAIG3-RFI-SW-C-6665-00
KAIG3-RFI-SW-C-6621 00 KAIG3-RFI-SW-C-6621-00
KAIG3-RFI-EC-S-8344 00 KAIG3-RFI-EC-S-8344-00
KAIG3-RFI-WG-C-6670 00 KAIG3-RFI-WG-C-6670-00
KAIG3-RFI-EC-S-8414 00 KAIG3-RFI-EC-S-8414-00
KAIG3-RFI-WG-S-8413 00 KAIG3-RFI-WG-S-8413-00
KAIG3-RFI-TG-S-8204 01 KAIG3-RFI-TG-S-8204-01
KAIG3-RFI-PG-A-0983 00 KAIG3-RFI-PG-A-0983-00
KAIG3-RFI-PT-A-0982 00 KAIG3-RFI-PT-A-0982-00
KAIG3-RFI-SW-C-6674 00 KAIG3-RFI-SW-C-6674-00
KAIG3-RFI-SW-C-6673 00 KAIG3-RFI-SW-C-6673-00
KAIG3-RFI-SW-C-6664 00 KAIG3-RFI-SW-C-6664-00
KAIG3-RFI-SW-C-6663 00 KAIG3-RFI-SW-C-6663-00
KAIG3-RFI-SW-C-6662 00 KAIG3-RFI-SW-C-6662-00
KAIG3-RFI-SW-C-6661 00 KAIG3-RFI-SW-C-6661-00
KAIG3-RFI-SW-C-6660 00 KAIG3-RFI-SW-C-6660-00
KAIG3-RFI-SW-C-6659 00 KAIG3-RFI-SW-C-6659-00
KAIG3-RFI-SW-C-6658 00 KAIG3-RFI-SW-C-6658-00
KAIG3-RFI-SW-C-6657 00 KAIG3-RFI-SW-C-6657-00
KAIG3-RFI-SW-C-6656 00 KAIG3-RFI-SW-C-6656-00
KAIG3-RFI-SW-C-6655 00 KAIG3-RFI-SW-C-6655-00
KAIG3-RFI-SW-C-6654 00 KAIG3-RFI-SW-C-6654-00
KAIG3-RFI-SW-C-6653 00 KAIG3-RFI-SW-C-6653-00
KAIG3-RFI-SW-C-6652 00 KAIG3-RFI-SW-C-6652-00
KAIG3-RFI-SW-C-6651 00 KAIG3-RFI-SW-C-6651-00
KAIG3-RFI-SW-C-6650 00 KAIG3-RFI-SW-C-6650-00
KAIG3-RFI-SW-C-6649 00 KAIG3-RFI-SW-C-6649-00
KAIG3-RFI-SW-C-6648 00 KAIG3-RFI-SW-C-6648-00
KAIG3-RFI-SW-C-6626 00 KAIG3-RFI-SW-C-6626-00
KAIG3-RFI-SW-C-6625 00 KAIG3-RFI-SW-C-6625-00
KAIG3-RFI-SW-C-6541 00 KAIG3-RFI-SW-C-6541-00
KAIG3-RFI-CO-S-8415 00 KAIG3-RFI-CO-S-8415-00
KAIG3-RFI-CO-S-8142 00 KAIG3-RFI-CO-S-8142-00
KAIG3-RFI-CO-S-8240 00 KAIG3-RFI-CO-S-8240-00
KAIG3-RFI-SM-P-0266 00 KAIG3-RFI-SM-P-0266-00
KAIG3-RFI-MC-S-8418 00 KAIG3-RFI-MC-S-8418-00
KAIG3-RFI-CO-S-8405 00 KAIG3-RFI-CO-S-8405-00
KAIG3-RFI-CO-C-6672 00 KAIG3-RFI-CO-C-6672-00
KAIG3-RFI-CO-C-6668 00 KAIG3-RFI-CO-C-6668-00
KAIG3-RFI-CF-C-6667 00 KAIG3-RFI-CF-C-6667-00
KAIG3-RFI-MC-C-6666 00 KAIG3-RFI-MC-C-6666-00
KAIG3-RFI-CO-C-6507 00 KAIG3-RFI-CO-C-6507-00
KAIG3-RFI-CO-C-6454 00 KAIG3-RFI-CO-C-6454-00
KAIG3-RFI-SW-C-6497 01 KAIG3-RFI-SW-C-6497-01
KAIG3-RFI-MC-S-8411 00 KAIG3-RFI-MC-S-8411-00
KAIG3-RFI-SW-C-6496 01 KAIG3-RFI-SW-C-6496-01
KAIG3-RFI-MC-SU-2796 00 KAIG3-RFI-MC-SU-2796-00
KAIG3-RFI-CO-S-8406 00 KAIG3-RFI-CO-S-8406-00
KAIG3-RFI-CO-S-8407 00 KAIG3-RFI-CO-S-8407-00
KAIG3-RFI-CO-SU-2795 00 KAIG3-RFI-CO-SU-2795-00
KAIG3-RFI-CO-S-8330 00 KAIG3-RFI-CO-S-8330-00
KAIG3-RFI-SW-C-6635 00 KAIG3-RFI-SW-C-6635-00
KAIG3-RFI-SW-C-6634 00 KAIG3-RFI-SW-C-6634-00
KAIG3-RFI-SW-C-6633 00 KAIG3-RFI-SW-C-6633-00
KAIG3-RFI-CO-S-8404 00 KAIG3-RFI-CO-S-8404-00
KAIG3-RFI-SW-LS-1438 00 KAIG3-RFI-SW-LS-1438-00
KAIG3-RFI-SW-LS-1437 00 KAIG3-RFI-SW-LS-1437-00
KAIG3-RFI-CC-S-8353 00 KAIG3-RFI-CC-S-8353-00
KAIG3-RFI-SW-LS-1436 00 KAIG3-RFI-SW-LS-1436-00
KAIG3-RFI-CC-S-8355 00 KAIG3-RFI-CC-S-8355-00
KAIG3-RFI-CC-S-8354 00 KAIG3-RFI-CC-S-8354-00
KAIG3-RFI-CO-C-6669 00 KAIG3-RFI-CO-C-6669-00
KAIG3-RFI-SW-C-6632 00 KAIG3-RFI-SW-C-6632-00
KAIG3-RFI-SW-C-6631 00 KAIG3-RFI-SW-C-6631-00
KAIG3-RFI-SW-C-6630 00 KAIG3-RFI-SW-C-6630-00
KAIG3-RFI-SW-C-6629 00 KAIG3-RFI-SW-C-6629-00
KAIG3-RFI-SW-C-6628 00 KAIG3-RFI-SW-C-6628-00
KAIG3-RFI-SW-C-6627 00 KAIG3-RFI-SW-C-6627-00
KAIG3-RFI-SW-C-6624 00 KAIG3-RFI-SW-C-6624-00
KAIG3-RFI-SW-C-6623 00 KAIG3-RFI-SW-C-6623-00
KAIG3-RFI-SW-C-6622 00 KAIG3-RFI-SW-C-6622-00
KAIG3-RFI-SW-C-6609 00 KAIG3-RFI-SW-C-6609-00
KAIG3-RFI-SW-C-6608 00 KAIG3-RFI-SW-C-6608-00
KAIG3-RFI-SW-C-6056 00 KAIG3-RFI-SW-C-6056-00
KAIG3-RFI-CO-SS-0367 00 KAIG3-RFI-CO-SS-0367-00
KAIG3-RFI-CO-SS-0368 00 KAIG3-RFI-CO-SS-0368-00
KAIG3-RFI-WG-LC-0724 00 KAIG3-RFI-WG-LC-0724-00
KAIG3-RFI-WG-E-0523 00 KAIG3-RFI-WG-E-0523-00
KAIG3-RFI-WG-E-0522 00 KAIG3-RFI-WG-E-0522-00
KAIG3-RFI-WG-LS-1435 00 KAIG3-RFI-WG-LS-1435-00
KAIG3-RFI-SW-LS-1434 00 KAIG3-RFI-SW-LS-1434-00
KAIG3-RFI-SW-C-6637 00 KAIG3-RFI-SW-C-6637-00
KAIG3-RFI-SW-C-6636 00 KAIG3-RFI-SW-C-6636-00
KAIG3-RFI-PC-LC-0726 00 KAIG3-RFI-PC-LC-0726-00
KAIG3-RFI-ZG-LC-0725 00 KAIG3-RFI-ZG-LC-0725-00
KAIG3-RFI-WG-C-6603 00 KAIG3-RFI-WG-C-6603-00
KAIG3-RFI-WG-C-6644 00 KAIG3-RFI-WG-C-6644-00
KAIG3-RFI-PG-C-6643 00 KAIG3-RFI-PG-C-6643-00
KAIG3-RFI-PG-C-6642 00 KAIG3-RFI-PG-C-6642-00
KAIG3-RFI-WG-C-6641 00 KAIG3-RFI-WG-C-6641-00
KAIG3-RFI-PG-C-6640 00 KAIG3-RFI-PG-C-6640-00
KAIG3-RFI-MB-A-0981 00 KAIG3-RFI-MB-A-0981-00
KAIG3-RFI-PG-A-0980 00 KAIG3-RFI-PG-A-0980-00
KAIG3-RFI-PT-A-0979 00 KAIG3-RFI-PT-A-0979-00
KAIG3-RFI-EC-SU-2792 00 KAIG3-RFI-EC-SU-2792-00
KAIG3-RFI-TG-S-8398 00 KAIG3-RFI-TG-S-8398-00
KAIG3-RFI-EC-S-8397 00 KAIG3-RFI-EC-S-8397-00
KAIG3-RFI-EC-S-8396 00 KAIG3-RFI-EC-S-8396-00
KAIG3-RFI-EC-S-8395 00 KAIG3-RFI-EC-S-8395-00
KAIG3-RFI-VG-C-6638 00 KAIG3-RFI-VG-C-6638-00
KAIG3-RFI-CC-C-6639 00 KAIG3-RFI-CC-C-6639-00
KAIG3-RFI-CO-C-6645 00 KAIG3-RFI-CO-C-6645-00
KAIG3-RFI-CO-C-6646 00 KAIG3-RFI-CO-C-6646-00
KAIG3-RFI-CO-S-8358 00 KAIG3-RFI-CO-S-8358-00
KAIG3-RFI-CO-S-8360 00 KAIG3-RFI-CO-S-8360-00
KAIG3-RFI-CF-S-8387 00 KAIG3-RFI-CF-S-8387-00
KAIG3-RFI-CF-S-8388 00 KAIG3-RFI-CF-S-8388-00
KAIG3-RFI-CO-S-8386 00 KAIG3-RFI-CO-S-8386-00
KAIG3-RFI-CO-S-8385 00 KAIG3-RFI-CO-S-8385-00
KAIG3-RFI-CO-S-8384 00 KAIG3-RFI-CO-S-8384-00
KAIG3-RFI-CF-S-8389 00 KAIG3-RFI-CF-S-8389-00
KAIG3-RFI-PG-C-6618 00 KAIG3-RFI-PG-C-6618-00
KAIG3-RFI-ZG-C-6596 00 KAIG3-RFI-ZG-C-6596-00
KAIG3-RFI-PG-A-0966 00 KAIG3-RFI-PG-A-0966-00
KAIG3-RFI-PT-A-0965 00 KAIG3-RFI-PT-A-0965-00
KAIG3-RFI-CO-S-8359 00 KAIG3-RFI-CO-S-8359-00
KAIG3-RFI-WG-S-8382 00 KAIG3-RFI-WG-S-8382-00
KAIG3-RFI-TG-S-8381 00 KAIG3-RFI-TG-S-8381-00
KAIG3-RFI-MC-S-8390 00 KAIG3-RFI-MC-S-8390-00
KAIG3-RFI-EC-S-8375 00 KAIG3-RFI-EC-S-8375-00
KAIG3-RFI-MC-SU-2790 00 KAIG3-RFI-MC-SU-2790-00
KAIG3-RFI-MC-S-8391 00 KAIG3-RFI-MC-S-8391-00
KAIG3-RFI-CO-S-8377 00 KAIG3-RFI-CO-S-8377-00
KAIG3-RFI-CO-S-8393 00 KAIG3-RFI-CO-S-8393-00
KAIG3-RFI-CO-SU-2791 00 KAIG3-RFI-CO-SU-2791-00
KAIG3-RFI-CO-S-8394 00 KAIG3-RFI-CO-S-8394-00
KAIG3-RFI-CO-S-8401 00 KAIG3-RFI-CO-S-8401-00
KAIG3-RFI-CO-SU-2793 00 KAIG3-RFI-CO-SU-2793-00
KAIG3-RFI-CO-SU-2794 00 KAIG3-RFI-CO-SU-2794-00
KAIG3-RFI-CF-S-8321 00 KAIG3-RFI-CF-S-8321-00
KAIG3-RFI-CO-C-6581 00 KAIG3-RFI-CO-C-6581-00
KAIG3-RFI-CO-C-6582 00 KAIG3-RFI-CO-C-6582-00
KAIG3-RFI-CO-S-8328 00 KAIG3-RFI-CO-S-8328-00
KAIG3-RFI-CO-S-8331 00 KAIG3-RFI-CO-S-8331-00
KAIG3-RFI-CO-S-8327 00 KAIG3-RFI-CO-S-8327-00
KAIG3-RFI-CO-SU-2779 00 KAIG3-RFI-CO-SU-2779-00
KAIG3-RFI-CO-SU-2778 00 KAIG3-RFI-CO-SU-2778-00
KAIG3-RFI-MC-S-8312 00 KAIG3-RFI-MC-S-8312-00
KAIG3-RFI-MC-S-8313 00 KAIG3-RFI-MC-S-8313-00
KAIG3-RFI-CO-S-8323 00 KAIG3-RFI-CO-S-8323-00
KAIG3-RFI-CO-SS-0366 00 KAIG3-RFI-CO-SS-0366-00
KAIG3-RFI-CO-SS-0365 00 KAIG3-RFI-CO-SS-0365-00
KAIG3-RFI-CO-SS-0364 00 KAIG3-RFI-CO-SS-0364-00
KAIG3-RFI-CO-SS-0362 00 KAIG3-RFI-CO-SS-0362-00
KAIG3-RFI-SW-C-6595 00 KAIG3-RFI-SW-C-6595-00
KAIG3-RFI-SW-C-6606 00 KAIG3-RFI-SW-C-6606-00
KAIG3-RFI-SW-C-6620 00 KAIG3-RFI-SW-C-6620-00
KAIG3-RFI-SW-C-6619 00 KAIG3-RFI-SW-C-6619-00
KAIG3-RFI-SW-C-6615 00 KAIG3-RFI-SW-C-6615-00
KAIG3-RFI-SW-C-6614 00 KAIG3-RFI-SW-C-6614-00
KAIG3-RFI-MC-S-8264 00 KAIG3-RFI-MC-S-8264-00
KAIG3-RFI-MC-S-8263 00 KAIG3-RFI-MC-S-8263-00
KAIG3-RFI-MC-S-8262 00 KAIG3-RFI-MC-S-8262-00
KAIG3-RFI-MC-S-8259 00 KAIG3-RFI-MC-S-8259-00
KAIG3-RFI-SW-C-6613 00 KAIG3-RFI-SW-C-6613-00
KAIG3-RFI-MC-S-8260 00 KAIG3-RFI-MC-S-8260-00
KAIG3-RFI-SW-C-6612 00 KAIG3-RFI-SW-C-6612-00
KAIG3-RFI-SW-C-6611 00 KAIG3-RFI-SW-C-6611-00
KAIG3-RFI-SW-C-6610 00 KAIG3-RFI-SW-C-6610-00
KAIG3-RFI-SW-C-6607 00 KAIG3-RFI-SW-C-6607-00
KAIG3-RFI-SW-C-6605 00 KAIG3-RFI-SW-C-6605-00
KAIG3-RFI-SW-C-6604 00 KAIG3-RFI-SW-C-6604-00
KAIG3-RFI-SW-C-6590 00 KAIG3-RFI-SW-C-6590-00
KAIG3-RFI-SW-C-6446 01 KAIG3-RFI-SW-C-6446-01
KAIG3-RFI-SW-C-6445 01 KAIG3-RFI-SW-C-6445-01
KAIG3-RFI-PA-SS-0357 01 KAIG3-RFI-PA-SS-0357-01
KAIG3-RFI-CF-C-6617 00 KAIG3-RFI-CF-C-6617-00
KAIG3-RFI-MC-C-6616 00 KAIG3-RFI-MC-C-6616-00
KAIG3-RFI-MC-S-8374 00 KAIG3-RFI-MC-S-8374-00
KAIG3-RFI-CO-S-8379 00 KAIG3-RFI-CO-S-8379-00
KAIG3-RFI-CO-S-8378 00 KAIG3-RFI-CO-S-8378-00
KAIG3-RFI-CO-S-8380 00 KAIG3-RFI-CO-S-8380-00
KAIG3-RFI-BO-LC-0712 00 KAIG3-RFI-BO-LC-0712-00
KAIG3-RFI-CO-S-8376 00 KAIG3-RFI-CO-S-8376-00
KAIG3-RFI-CO-S-8383 00 KAIG3-RFI-CO-S-8383-00
KAIG3-RFI-CF-S-8285 00 KAIG3-RFI-CF-S-8285-00
KAIG3-RFI-CF-S-8284 00 KAIG3-RFI-CF-S-8284-00
KAIG3-RFI-CO-S-8373 00 KAIG3-RFI-CO-S-8373-00
KAIG3-RFI-CO-S-8372 00 KAIG3-RFI-CO-S-8372-00
KAIG3-RFI-CO-S-8371 00 KAIG3-RFI-CO-S-8371-00
KAIG3-RFI-CO-S-8364 00 KAIG3-RFI-CO-S-8364-00
KAIG3-RFI-CO-S-8365 00 KAIG3-RFI-CO-S-8365-00
KAIG3-RFI-CO-S-8366 00 KAIG3-RFI-CO-S-8366-00
KAIG3-RFI-SW-A-0964 00 KAIG3-RFI-SW-A-0964-00
KAIG3-RFI-MB-SS-0376 00 KAIG3-RFI-MB-SS-0376-00
KAIG3-RFI-PG-C-6602 00 KAIG3-RFI-PG-C-6602-00
KAIG3-RFI-EC-SU-2788 00 KAIG3-RFI-EC-SU-2788-00
KAIG3-RFI-WG-SU-2782 00 KAIG3-RFI-WG-SU-2782-00
KAIG3-RFI-TG-S-8368 00 KAIG3-RFI-TG-S-8368-00
KAIG3-RFI-EC-S-8367 00 KAIG3-RFI-EC-S-8367-00
KAIG3-RFI-WG-S-8357 00 KAIG3-RFI-WG-S-8357-00
KAIG3-RFI-PG-S-8356 00 KAIG3-RFI-PG-S-8356-00
KAIG3-RFI-PC-S-7974 00 KAIG3-RFI-PC-S-7974-00
KAIG3-RFI-SW-C-6601 00 KAIG3-RFI-SW-C-6601-00
KAIG3-RFI-SW-C-6594 00 KAIG3-RFI-SW-C-6594-00
KAIG3-RFI-SW-P-0265 00 KAIG3-RFI-SW-P-0265-00
KAIG3-RFI-SW-C-6593 00 KAIG3-RFI-SW-C-6593-00
KAIG3-RFI-SW-C-6592 00 KAIG3-RFI-SW-C-6592-00
KAIG3-RFI-SW-P-0264 00 KAIG3-RFI-SW-P-0264-00
KAIG3-RFI-SW-C-6591 00 KAIG3-RFI-SW-C-6591-00
KAIG3-RFI-SW-C-6589 00 KAIG3-RFI-SW-C-6589-00
KAIG3-RFI-SW-C-6588 00 KAIG3-RFI-SW-C-6588-00
KAIG3-RFI-SW-C-6587 00 KAIG3-RFI-SW-C-6587-00
KAIG3-RFI-SW-C-6586 00 KAIG3-RFI-SW-C-6586-00
KAIG3-RFI-SW-C-6585 00 KAIG3-RFI-SW-C-6585-00
KAIG3-RFI-SW-C-6584 00 KAIG3-RFI-SW-C-6584-00
KAIG3-RFI-SW-C-6583 00 KAIG3-RFI-SW-C-6583-00
KAIG3-RFI-SW-C-6598 00 KAIG3-RFI-SW-C-6598-00
KAIG3-RFI-SW-C-6448 01 KAIG3-RFI-SW-C-6448-01
KAIG3-RFI-SW-C-6597 00 KAIG3-RFI-SW-C-6597-00
KAIG3-RFI-MC-SU-2787 00 KAIG3-RFI-MC-SU-2787-00
KAIG3-RFI-CO-S-8370 00 KAIG3-RFI-CO-S-8370-00
KAIG3-RFI-CO-S-8369 00 KAIG3-RFI-CO-S-8369-00
KAIG3-RFI-MC-S-8304 00 KAIG3-RFI-MC-S-8304-00
KAIG3-RFI-WG-LC-0704 01 KAIG3-RFI-WG-LC-0704-01
KAIG3-RFI-WG-E-0514 01 KAIG3-RFI-WG-E-0514-01
KAIG3-RFI-MC-S-8361 00 KAIG3-RFI-MC-S-8361-00
KAIG3-RFI-MC-S-8305 00 KAIG3-RFI-MC-S-8305-00
KAIG3-RFI-MB-LC-0723 00 KAIG3-RFI-MB-LC-0723-00
KAIG3-RFI-CO-S-8363 00 KAIG3-RFI-CO-S-8363-00
KAIG3-RFI-MB-LC-0711 00 KAIG3-RFI-MB-LC-0711-00
KAIG3-RFI-MC-S-8362 00 KAIG3-RFI-MC-S-8362-00
KAIG3-RFI-ST-S-8351 00 KAIG3-RFI-ST-S-8351-00
KAIG3-RFI-MC-S-8306 00 KAIG3-RFI-MC-S-8306-00
KAIG3-RFI-PA-SS-0327 00 KAIG3-RFI-PA-SS-0327-00
KAIG3-RFI-SW-C-6561 00 KAIG3-RFI-SW-C-6561-00
KAIG3-RFI-CO-S-8209 00 KAIG3-RFI-CO-S-8209-00
KAIG3-RFI-CO-S-8054 00 KAIG3-RFI-CO-S-8054-00
KAIG3-RFI-CO-S-8201 00 KAIG3-RFI-CO-S-8201-00
KAIG3-RFI-SW-C-6578 00 KAIG3-RFI-SW-C-6578-00
KAIG3-RFI-SW-C-6573 00 KAIG3-RFI-SW-C-6573-00
KAIG3-RFI-SW-C-6572 00 KAIG3-RFI-SW-C-6572-00
KAIG3-RFI-SW-C-6571 00 KAIG3-RFI-SW-C-6571-00
KAIG3-RFI-SW-C-6565 00 KAIG3-RFI-SW-C-6565-00
KAIG3-RFI-SW-C-6564 00 KAIG3-RFI-SW-C-6564-00
KAIG3-RFI-SW-C-6563 00 KAIG3-RFI-SW-C-6563-00
KAIG3-RFI-SW-C-6562 00 KAIG3-RFI-SW-C-6562-00
KAIG3-RFI-SW-C-6560 00 KAIG3-RFI-SW-C-6560-00
KAIG3-RFI-DG-C-6579 00 KAIG3-RFI-DG-C-6579-00
KAIG3-RFI-SW-C-6559 00 KAIG3-RFI-SW-C-6559-00
KAIG3-RFI-WG-C-6570 00 KAIG3-RFI-WG-C-6570-00
KAIG3-RFI-SW-C-6557 00 KAIG3-RFI-SW-C-6557-00
KAIG3-RFI-SW-C-6556 00 KAIG3-RFI-SW-C-6556-00
KAIG3-RFI-WG-C-6569 00 KAIG3-RFI-WG-C-6569-00
KAIG3-RFI-SW-C-6555 00 KAIG3-RFI-SW-C-6555-00
KAIG3-RFI-SW-C-6554 00 KAIG3-RFI-SW-C-6554-00
KAIG3-RFI-ZG-C-6568 00 KAIG3-RFI-ZG-C-6568-00
KAIG3-RFI-PG-C-6567 00 KAIG3-RFI-PG-C-6567-00
KAIG3-RFI-PG-C-6566 00 KAIG3-RFI-PG-C-6566-00
KAIG3-RFI-TG-S-8347 00 KAIG3-RFI-TG-S-8347-00
KAIG3-RFI-PG-S-8345 00 KAIG3-RFI-PG-S-8345-00
KAIG3-RFI-WG-S-8343 00 KAIG3-RFI-WG-S-8343-00
KAIG3-RFI-CO-SU-2784 00 KAIG3-RFI-CO-SU-2784-00
KAIG3-RFI-MB-A-0963 00 KAIG3-RFI-MB-A-0963-00
KAIG3-RFI-WG-C-6547 00 KAIG3-RFI-WG-C-6547-00
KAIG3-RFI-WG-S-8332 00 KAIG3-RFI-WG-S-8332-00
KAIG3-RFI-CF-C-6580 00 KAIG3-RFI-CF-C-6580-00
KAIG3-RFI-CO-C-6577 00 KAIG3-RFI-CO-C-6577-00
KAIG3-RFI-MC-C-6576 00 KAIG3-RFI-MC-C-6576-00
KAIG3-RFI-MC-C-6575 00 KAIG3-RFI-MC-C-6575-00
KAIG3-RFI-MC-C-6574 00 KAIG3-RFI-MC-C-6574-00
KAIG3-RFI-LM-SU-2783 00 KAIG3-RFI-LM-SU-2783-00
KAIG3-RFI-LM-S-8346 00 KAIG3-RFI-LM-S-8346-00
KAIG3-RFI-CO-S-8337 00 KAIG3-RFI-CO-S-8337-00
KAIG3-RFI-CO-S-8341 00 KAIG3-RFI-CO-S-8341-00
KAIG3-RFI-CO-S-8340 00 KAIG3-RFI-CO-S-8340-00
KAIG3-RFI-CO-SU-2780 00 KAIG3-RFI-CO-SU-2780-00
KAIG3-RFI-CO-S-8338 00 KAIG3-RFI-CO-S-8338-00
KAIG3-RFI-ST-S-8352 00 KAIG3-RFI-ST-S-8352-00
KAIG3-RFI-CO-S-8320 00 KAIG3-RFI-CO-S-8320-00
KAIG3-RFI-CO-SU-2776 00 KAIG3-RFI-CO-SU-2776-00
KAIG3-RFI-MC-SU-2773 00 KAIG3-RFI-MC-SU-2773-00
KAIG3-RFI-CO-SU-2772 00 KAIG3-RFI-CO-SU-2772-00
KAIG3-RFI-CO-S-8311 00 KAIG3-RFI-CO-S-8311-00
KAIG3-RFI-CO-S-8310 00 KAIG3-RFI-CO-S-8310-00
KAIG3-RFI-MB-A-0962 00 KAIG3-RFI-MB-A-0962-00
KAIG3-RFI-ZG-C-6551 00 KAIG3-RFI-ZG-C-6551-00
KAIG3-RFI-SG-C-6550 00 KAIG3-RFI-SG-C-6550-00
KAIG3-RFI-SG-C-6549 00 KAIG3-RFI-SG-C-6549-00
KAIG3-RFI-WG-C-6548 00 KAIG3-RFI-WG-C-6548-00
KAIG3-RFI-WG-C-6546 00 KAIG3-RFI-WG-C-6546-00
KAIG3-RFI-WG-S-8333 00 KAIG3-RFI-WG-S-8333-00
KAIG3-RFI-SW-C-6524 00 KAIG3-RFI-SW-C-6524-00
KAIG3-RFI-SW-LC-0714 00 KAIG3-RFI-SW-LC-0714-00
KAIG3-RFI-SW-LC-0713 00 KAIG3-RFI-SW-LC-0713-00
KAIG3-RFI-PG-E-0518 00 KAIG3-RFI-PG-E-0518-00
KAIG3-RFI-MB-E-0517 00 KAIG3-RFI-MB-E-0517-00
KAIG3-RFI-MB-E-0486 00 KAIG3-RFI-MB-E-0486-00
KAIG3-RFI-SW-C-6553 00 KAIG3-RFI-SW-C-6553-00
KAIG3-RFI-SW-C-6552 00 KAIG3-RFI-SW-C-6552-00
KAIG3-RFI-SW-C-6545 00 KAIG3-RFI-SW-C-6545-00
KAIG3-RFI-SW-C-6544 00 KAIG3-RFI-SW-C-6544-00
KAIG3-RFI-SW-C-6543 00 KAIG3-RFI-SW-C-6543-00
KAIG3-RFI-SW-C-6542 00 KAIG3-RFI-SW-C-6542-00
KAIG3-RFI-SW-C-6540 00 KAIG3-RFI-SW-C-6540-00
KAIG3-RFI-SW-C-6539 00 KAIG3-RFI-SW-C-6539-00
KAIG3-RFI-SW-C-6538 00 KAIG3-RFI-SW-C-6538-00
KAIG3-RFI-SW-C-6530 00 KAIG3-RFI-SW-C-6530-00
KAIG3-RFI-SW-C-6529 00 KAIG3-RFI-SW-C-6529-00
KAIG3-RFI-SW-C-6528 00 KAIG3-RFI-SW-C-6528-00
KAIG3-RFI-SW-C-6527 00 KAIG3-RFI-SW-C-6527-00
KAIG3-RFI-SW-C-6526 00 KAIG3-RFI-SW-C-6526-00
KAIG3-RFI-SW-C-6525 00 KAIG3-RFI-SW-C-6525-00
KAIG3-RFI-SW-C-6523 00 KAIG3-RFI-SW-C-6523-00
KAIG3-RFI-SW-C-6522 00 KAIG3-RFI-SW-C-6522-00
KAIG3-RFI-SW-C-6521 00 KAIG3-RFI-SW-C-6521-00
KAIG3-RFI-SW-C-6520 00 KAIG3-RFI-SW-C-6520-00
KAIG3-RFI-SW-C-6515 00 KAIG3-RFI-SW-C-6515-00
KAIG3-RFI-SW-C-6514 00 KAIG3-RFI-SW-C-6514-00
KAIG3-RFI-PG-C-6537 00 KAIG3-RFI-PG-C-6537-00
KAIG3-RFI-WG-C-6535 00 KAIG3-RFI-WG-C-6535-00
KAIG3-RFI-WG-C-6534 00 KAIG3-RFI-WG-C-6534-00
KAIG3-RFI-SG-C-6533 00 KAIG3-RFI-SG-C-6533-00
KAIG3-RFI-SG-C-6532 00 KAIG3-RFI-SG-C-6532-00
KAIG3-RFI-WG-C-6531 00 KAIG3-RFI-WG-C-6531-00
KAIG3-RFI-PG-S-8318 00 KAIG3-RFI-PG-S-8318-00
KAIG3-RFI-EC-S-8317 00 KAIG3-RFI-EC-S-8317-00
KAIG3-RFI-TG-S-8316 00 KAIG3-RFI-TG-S-8316-00
KAIG3-RFI-EC-SU-2775 00 KAIG3-RFI-EC-SU-2775-00
KAIG3-RFI-TG-SU-2774 00 KAIG3-RFI-TG-SU-2774-00
KAIG3-RFI-TB-E-0521 00 KAIG3-RFI-TB-E-0521-00
KAIG3-RFI-TB-LC-0722 00 KAIG3-RFI-TB-LC-0722-00
KAIG3-RFI-TB-LC-0720 00 KAIG3-RFI-TB-LC-0720-00
KAIG3-RFI-TB-LC-0721 00 KAIG3-RFI-TB-LC-0721-00
KAIG3-RFI-TB-LC-0719 00 KAIG3-RFI-TB-LC-0719-00
KAIG3-RFI-SW-P-0263 00 KAIG3-RFI-SW-P-0263-00
KAIG3-RFI-SW-P-0262 00 KAIG3-RFI-SW-P-0262-00
KAIG3-RFI-MC-C-6536 00 KAIG3-RFI-MC-C-6536-00
KAIG3-RFI-MC-S-8298 00 KAIG3-RFI-MC-S-8298-00
KAIG3-RFI-CC-LC-0718 00 KAIG3-RFI-CC-LC-0718-00
KAIG3-RFI-PC-LC-0717 00 KAIG3-RFI-PC-LC-0717-00
KAIG3-RFI-MC-C-6508 00 KAIG3-RFI-MC-C-6508-00
KAIG3-RFI-LM-E-0520 00 KAIG3-RFI-LM-E-0520-00
KAIG3-RFI-LM-E-0519 00 KAIG3-RFI-LM-E-0519-00
KAIG3-RFI-CC-LC-0716 00 KAIG3-RFI-CC-LC-0716-00
KAIG3-RFI-PC-LC-0715 00 KAIG3-RFI-PC-LC-0715-00
KAIG3-RFI-VG-P-0261 00 KAIG3-RFI-VG-P-0261-00
KAIG3-RFI-SW-C-6497 00 KAIG3-RFI-SW-C-6497-00
KAIG3-RFI-SW-C-6496 00 KAIG3-RFI-SW-C-6496-00
KAIG3-RFI-SW-C-6471 01 KAIG3-RFI-SW-C-6471-01
KAIG3-RFI-SW-LS-1432 00 KAIG3-RFI-SW-LS-1432-00
KAIG3-RFI-DG-LS-1430 00 KAIG3-RFI-DG-LS-1430-00
KAIG3-RFI-SW-C-6518 00 KAIG3-RFI-SW-C-6518-00
KAIG3-RFI-SW-C-6517 00 KAIG3-RFI-SW-C-6517-00
KAIG3-RFI-SW-C-6516 00 KAIG3-RFI-SW-C-6516-00
KAIG3-RFI-SW-C-6513 00 KAIG3-RFI-SW-C-6513-00
KAIG3-RFI-SW-C-6512 00 KAIG3-RFI-SW-C-6512-00
KAIG3-RFI-SW-C-6511 00 KAIG3-RFI-SW-C-6511-00
KAIG3-RFI-SW-C-6510 00 KAIG3-RFI-SW-C-6510-00
KAIG3-RFI-SW-C-6509 00 KAIG3-RFI-SW-C-6509-00
KAIG3-RFI-SW-C-6504 00 KAIG3-RFI-SW-C-6504-00
KAIG3-RFI-SW-C-6503 00 KAIG3-RFI-SW-C-6503-00
KAIG3-RFI-SW-C-6502 00 KAIG3-RFI-SW-C-6502-00
KAIG3-RFI-SW-C-6501 00 KAIG3-RFI-SW-C-6501-00
KAIG3-RFI-SW-C-6500 00 KAIG3-RFI-SW-C-6500-00
KAIG3-RFI-SW-C-6499 00 KAIG3-RFI-SW-C-6499-00
KAIG3-RFI-SW-C-6491 00 KAIG3-RFI-SW-C-6491-00
KAIG3-RFI-SW-C-6490 00 KAIG3-RFI-SW-C-6490-00
KAIG3-RFI-SW-C-6489 00 KAIG3-RFI-SW-C-6489-00
KAIG3-RFI-SW-C-6485 00 KAIG3-RFI-SW-C-6485-00
KAIG3-RFI-SW-C-6484 00 KAIG3-RFI-SW-C-6484-00
KAIG3-RFI-SW-C-6413 00 KAIG3-RFI-SW-C-6413-00
KAIG3-RFI-SW-C-6412 00 KAIG3-RFI-SW-C-6412-00
KAIG3-RFI-ZG-A-0961 00 KAIG3-RFI-ZG-A-0961-00
KAIG3-RFI-ZG-LS-1433 00 KAIG3-RFI-ZG-LS-1433-00
KAIG3-RFI-WG-C-6519 00 KAIG3-RFI-WG-C-6519-00
KAIG3-RFI-PG-C-6498 00 KAIG3-RFI-PG-C-6498-00
KAIG3-RFI-WG-C-6455 00 KAIG3-RFI-WG-C-6455-00
KAIG3-RFI-EC-S-8303 00 KAIG3-RFI-EC-S-8303-00
KAIG3-RFI-EC-S-8302 00 KAIG3-RFI-EC-S-8302-00
KAIG3-RFI-EC-S-8301 00 KAIG3-RFI-EC-S-8301-00
KAIG3-RFI-WG-S-8300 00 KAIG3-RFI-WG-S-8300-00
KAIG3-RFI-WG-S-8299 00 KAIG3-RFI-WG-S-8299-00
KAIG3-RFI-TB-SU-2771 00 KAIG3-RFI-TB-SU-2771-00
KAIG3-RFI-EC-SU-2770 00 KAIG3-RFI-EC-SU-2770-00
KAIG3-RFI-WG-SU-2769 00 KAIG3-RFI-WG-SU-2769-00
KAIG3-RFI-WG-SU-2768 00 KAIG3-RFI-WG-SU-2768-00
KAIG3-RFI-CO-C-6505 00 KAIG3-RFI-CO-C-6505-00
KAIG3-RFI-MC-C-6473 00 KAIG3-RFI-MC-C-6473-00
KAIG3-RFI-MC-C-6506 00 KAIG3-RFI-MC-C-6506-00
KAIG3-RFI-LM-S-8309 00 KAIG3-RFI-LM-S-8309-00
KAIG3-RFI-CO-S-8307 00 KAIG3-RFI-CO-S-8307-00
KAIG3-RFI-MC-S-8252 00 KAIG3-RFI-MC-S-8252-00
KAIG3-RFI-CF-S-8308 00 KAIG3-RFI-CF-S-8308-00
KAIG3-RFI-MC-S-8297 00 KAIG3-RFI-MC-S-8297-00
KAIG3-RFI-CO-E-0213 01 KAIG3-RFI-CO-E-0213-01
KAIG3-RFI-MC-SU-2767 00 KAIG3-RFI-MC-SU-2767-00
KAIG3-RFI-CO-S-7938 00 KAIG3-RFI-CO-S-7938-00
KAIG3-RFI-CO-S-8203 00 KAIG3-RFI-CO-S-8203-00
KAIG3-RFI-CO-S-8048 00 KAIG3-RFI-CO-S-8048-00
KAIG3-RFI-MB-LC-0699 01 KAIG3-RFI-MB-LC-0699-01
KAIG3-RFI-MB-LC-0698 01 KAIG3-RFI-MB-LC-0698-01
KAIG3-RFI-SW-LC-0708 00 KAIG3-RFI-SW-LC-0708-00
KAIG3-RFI-SW-LC-0707 00 KAIG3-RFI-SW-LC-0707-00
KAIG3-RFI-CC-C-4577 00 KAIG3-RFI-CC-C-4577-00
KAIG3-RFI-MB-LC-0709 00 KAIG3-RFI-MB-LC-0709-00
KAIG3-RFI-SW-LS-1431 00 KAIG3-RFI-SW-LS-1431-00
KAIG3-RFI-SW-LS-1429 00 KAIG3-RFI-SW-LS-1429-00
KAIG3-RFI-SW-C-6472 00 KAIG3-RFI-SW-C-6472-00
KAIG3-RFI-SW-C-6471 00 KAIG3-RFI-SW-C-6471-00
KAIG3-RFI-SW-C-6488 00 KAIG3-RFI-SW-C-6488-00
KAIG3-RFI-SW-C-6487 00 KAIG3-RFI-SW-C-6487-00
KAIG3-RFI-SW-C-6486 00 KAIG3-RFI-SW-C-6486-00
KAIG3-RFI-SW-C-6483 00 KAIG3-RFI-SW-C-6483-00
KAIG3-RFI-SW-C-6482 00 KAIG3-RFI-SW-C-6482-00
KAIG3-RFI-SW-C-6481 00 KAIG3-RFI-SW-C-6481-00
KAIG3-RFI-SW-C-6480 00 KAIG3-RFI-SW-C-6480-00
KAIG3-RFI-SW-C-6479 00 KAIG3-RFI-SW-C-6479-00
KAIG3-RFI-SW-C-6478 00 KAIG3-RFI-SW-C-6478-00
KAIG3-RFI-SW-C-6477 00 KAIG3-RFI-SW-C-6477-00
KAIG3-RFI-SW-C-6476 00 KAIG3-RFI-SW-C-6476-00
KAIG3-RFI-SW-C-6475 00 KAIG3-RFI-SW-C-6475-00
KAIG3-RFI-SW-C-6474 00 KAIG3-RFI-SW-C-6474-00
KAIG3-RFI-SW-C-6470 00 KAIG3-RFI-SW-C-6470-00
KAIG3-RFI-SW-C-6469 00 KAIG3-RFI-SW-C-6469-00
KAIG3-RFI-SW-C-6450 00 KAIG3-RFI-SW-C-6450-00
KAIG3-RFI-SW-C-6449 00 KAIG3-RFI-SW-C-6449-00
KAIG3-RFI-CO-S-8238 00 KAIG3-RFI-CO-S-8238-00
KAIG3-RFI-CO-C-6452 00 KAIG3-RFI-CO-C-6452-00
KAIG3-RFI-CO-S-8283 00 KAIG3-RFI-CO-S-8283-00
KAIG3-RFI-CO-S-8294 00 KAIG3-RFI-CO-S-8294-00
KAIG3-RFI-CO-SU-2766 00 KAIG3-RFI-CO-SU-2766-00
KAIG3-RFI-MC-S-8293 00 KAIG3-RFI-MC-S-8293-00
KAIG3-RFI-MC-SU-2765 00 KAIG3-RFI-MC-SU-2765-00
KAIG3-RFI-MC-S-8291 00 KAIG3-RFI-MC-S-8291-00
KAIG3-RFI-MC-S-8292 00 KAIG3-RFI-MC-S-8292-00
KAIG3-RFI-CO-S-8276 00 KAIG3-RFI-CO-S-8276-00
KAIG3-RFI-CO-SU-2759 00 KAIG3-RFI-CO-SU-2759-00
KAIG3-RFI-CO-S-8233 00 KAIG3-RFI-CO-S-8233-00
KAIG3-RFI-CO-S-8280 00 KAIG3-RFI-CO-S-8280-00
KAIG3-RFI-PG-C-6495 00 KAIG3-RFI-PG-C-6495-00
KAIG3-RFI-SG-C-6494 00 KAIG3-RFI-SG-C-6494-00
KAIG3-RFI-SG-C-6493 00 KAIG3-RFI-SG-C-6493-00
KAIG3-RFI-WG-C-6492 00 KAIG3-RFI-WG-C-6492-00
KAIG3-RFI-WG-C-6463 00 KAIG3-RFI-WG-C-6463-00
KAIG3-RFI-EC-SU-2764 00 KAIG3-RFI-EC-SU-2764-00
KAIG3-RFI-EC-SU-2763 00 KAIG3-RFI-EC-SU-2763-00
KAIG3-RFI-WG-SU-2762 00 KAIG3-RFI-WG-SU-2762-00
KAIG3-RFI-PG-S-8290 00 KAIG3-RFI-PG-S-8290-00
KAIG3-RFI-EC-S-8289 00 KAIG3-RFI-EC-S-8289-00
KAIG3-RFI-EC-S-8288 00 KAIG3-RFI-EC-S-8288-00
KAIG3-RFI-WG-S-8287 00 KAIG3-RFI-WG-S-8287-00
KAIG3-RFI-CO-S-8277 00 KAIG3-RFI-CO-S-8277-00
KAIG3-RFI-CO-S-8257 00 KAIG3-RFI-CO-S-8257-00
KAIG3-RFI-CO-S-8267 00 KAIG3-RFI-CO-S-8267-00
KAIG3-RFI-CO-S-8268 00 KAIG3-RFI-CO-S-8268-00
KAIG3-RFI-CO-S-8265 00 KAIG3-RFI-CO-S-8265-00
KAIG3-RFI-CO-S-8266 00 KAIG3-RFI-CO-S-8266-00
KAIG3-RFI-CO-SU-2754 00 KAIG3-RFI-CO-SU-2754-00
KAIG3-RFI-CO-S-8274 00 KAIG3-RFI-CO-S-8274-00
KAIG3-RFI-CO-S-8273 00 KAIG3-RFI-CO-S-8273-00
KAIG3-RFI-CO-S-8248 00 KAIG3-RFI-CO-S-8248-00
KAIG3-RFI-CO-SU-2753 00 KAIG3-RFI-CO-SU-2753-00
KAIG3-RFI-CO-S-8245 00 KAIG3-RFI-CO-S-8245-00
KAIG3-RFI-CO-S-8246 00 KAIG3-RFI-CO-S-8246-00
KAIG3-RFI-CO-S-7680 00 KAIG3-RFI-CO-S-7680-00
KAIG3-RFI-CO-S-8278 00 KAIG3-RFI-CO-S-8278-00
KAIG3-RFI-CO-SU-2760 00 KAIG3-RFI-CO-SU-2760-00
KAIG3-RFI-CO-SU-2757 00 KAIG3-RFI-CO-SU-2757-00
KAIG3-RFI-CO-S-8255 00 KAIG3-RFI-CO-S-8255-00
KAIG3-RFI-MC-S-8253 00 KAIG3-RFI-MC-S-8253-00
KAIG3-RFI-CO-SU-2751 00 KAIG3-RFI-CO-SU-2751-00
KAIG3-RFI-CO-S-8239 00 KAIG3-RFI-CO-S-8239-00
KAIG3-RFI-CO-SS-0363 00 KAIG3-RFI-CO-SS-0363-00
KAIG3-RFI-MC-C-6453 00 KAIG3-RFI-MC-C-6453-00
KAIG3-RFI-WG-P-0260 00 KAIG3-RFI-WG-P-0260-00
KAIG3-RFI-CO-S-8271 00 KAIG3-RFI-CO-S-8271-00
KAIG3-RFI-CO-S-8272 00 KAIG3-RFI-CO-S-8272-00
KAIG3-RFI-CO-SU-2758 00 KAIG3-RFI-CO-SU-2758-00
KAIG3-RFI-CO-SU-2755 00 KAIG3-RFI-CO-SU-2755-00
KAIG3-RFI-SW-C-6468 00 KAIG3-RFI-SW-C-6468-00
KAIG3-RFI-SW-C-6467 00 KAIG3-RFI-SW-C-6467-00
KAIG3-RFI-SW-C-6466 00 KAIG3-RFI-SW-C-6466-00
KAIG3-RFI-SW-C-6465 00 KAIG3-RFI-SW-C-6465-00
KAIG3-RFI-SW-C-6464 00 KAIG3-RFI-SW-C-6464-00
KAIG3-RFI-SW-C-6448 00 KAIG3-RFI-SW-C-6448-00
KAIG3-RFI-SW-C-6447 00 KAIG3-RFI-SW-C-6447-00
KAIG3-RFI-SW-C-6440 00 KAIG3-RFI-SW-C-6440-00
KAIG3-RFI-MC-C-6451 00 KAIG3-RFI-MC-C-6451-00
KAIG3-RFI-SW-C-6439 00 KAIG3-RFI-SW-C-6439-00
KAIG3-RFI-SW-C-6438 00 KAIG3-RFI-SW-C-6438-00
KAIG3-RFI-SW-C-6437 00 KAIG3-RFI-SW-C-6437-00
KAIG3-RFI-SW-C-6436 00 KAIG3-RFI-SW-C-6436-00
KAIG3-RFI-SW-C-6435 00 KAIG3-RFI-SW-C-6435-00
KAIG3-RFI-SW-C-6434 00 KAIG3-RFI-SW-C-6434-00
KAIG3-RFI-SW-C-6433 00 KAIG3-RFI-SW-C-6433-00
KAIG3-RFI-SW-C-6432 00 KAIG3-RFI-SW-C-6432-00
KAIG3-RFI-SW-C-6431 00 KAIG3-RFI-SW-C-6431-00
KAIG3-RFI-SW-C-6430 00 KAIG3-RFI-SW-C-6430-00
KAIG3-RFI-SW-C-6426 00 KAIG3-RFI-SW-C-6426-00
KAIG3-RFI-SW-C-6425 00 KAIG3-RFI-SW-C-6425-00
KAIG3-RFI-SW-C-6424 00 KAIG3-RFI-SW-C-6424-00
KAIG3-RFI-MC-C-6452 00 KAIG3-RFI-MC-C-6452-00
KAIG3-RFI-SW-C-6423 00 KAIG3-RFI-SW-C-6423-00
KAIG3-RFI-SW-C-6420 00 KAIG3-RFI-SW-C-6420-00
KAIG3-RFI-SW-C-6419 00 KAIG3-RFI-SW-C-6419-00
KAIG3-RFI-SW-C-6418 00 KAIG3-RFI-SW-C-6418-00
KAIG3-RFI-WG-C-6462 00 KAIG3-RFI-WG-C-6462-00
KAIG3-RFI-ZG-C-6461 00 KAIG3-RFI-ZG-C-6461-00
KAIG3-RFI-ZG-C-6460 00 KAIG3-RFI-ZG-C-6460-00
KAIG3-RFI-ZG-C-6459 00 KAIG3-RFI-ZG-C-6459-00
KAIG3-RFI-ZG-C-6458 00 KAIG3-RFI-ZG-C-6458-00
KAIG3-RFI-PG-C-6457 00 KAIG3-RFI-PG-C-6457-00
KAIG3-RFI-PG-C-6456 00 KAIG3-RFI-PG-C-6456-00
KAIG3-RFI-TG-S-8270 00 KAIG3-RFI-TG-S-8270-00
KAIG3-RFI-TG-S-8269 00 KAIG3-RFI-TG-S-8269-00
KAIG3-RFI-EC-SU-2750 00 KAIG3-RFI-EC-SU-2750-00
KAIG3-RFI-MC-S-8254 00 KAIG3-RFI-MC-S-8254-00
KAIG3-RFI-MC-SU-2756 00 KAIG3-RFI-MC-SU-2756-00
KAIG3-RFI-CO-S-8242 00 KAIG3-RFI-CO-S-8242-00
KAIG3-RFI-CO-S-8247 00 KAIG3-RFI-CO-S-8247-00
KAIG3-RFI-CO-S-8224 00 KAIG3-RFI-CO-S-8224-00
KAIG3-RFI-CO-S-8223 00 KAIG3-RFI-CO-S-8223-00
KAIG3-RFI-CO-SU-2749 00 KAIG3-RFI-CO-SU-2749-00
KAIG3-RFI-CO-S-8234 00 KAIG3-RFI-CO-S-8234-00
KAIG3-RFI-MC-S-8243 00 KAIG3-RFI-MC-S-8243-00
KAIG3-RFI-MC-SU-2752 00 KAIG3-RFI-MC-SU-2752-00
KAIG3-RFI-CO-C-6391 00 KAIG3-RFI-CO-C-6391-00
KAIG3-RFI-MC-C-6408 00 KAIG3-RFI-MC-C-6408-00
KAIG3-RFI-MC-C-6407 00 KAIG3-RFI-MC-C-6407-00
KAIG3-RFI-CO-C-6406 00 KAIG3-RFI-CO-C-6406-00
KAIG3-RFI-PC-S-7939 00 KAIG3-RFI-PC-S-7939-00
KAIG3-RFI-CO-SS-0358 00 KAIG3-RFI-CO-SS-0358-00
KAIG3-RFI-CO-SS-0361 00 KAIG3-RFI-CO-SS-0361-00
KAIG3-RFI-CO-SS-0359 00 KAIG3-RFI-CO-SS-0359-00
KAIG3-RFI-ZG-C-6169 01 KAIG3-RFI-ZG-C-6169-01
KAIG3-RFI-CO-SS-0360 00 KAIG3-RFI-CO-SS-0360-00
KAIG3-RFI-WG-C-6444 00 KAIG3-RFI-WG-C-6444-00
KAIG3-RFI-CO-SS-0356 00 KAIG3-RFI-CO-SS-0356-00
KAIG3-RFI-SW-C-6443 00 KAIG3-RFI-SW-C-6443-00
KAIG3-RFI-PG-C-6442 00 KAIG3-RFI-PG-C-6442-00
KAIG3-RFI-DG-C-6441 00 KAIG3-RFI-DG-C-6441-00
KAIG3-RFI-ZG-C-6422 00 KAIG3-RFI-ZG-C-6422-00
KAIG3-RFI-EC-S-8237 00 KAIG3-RFI-EC-S-8237-00
KAIG3-RFI-EC-S-8236 00 KAIG3-RFI-EC-S-8236-00
KAIG3-RFI-SW-LS-1428 00 KAIG3-RFI-SW-LS-1428-00
KAIG3-RFI-SW-LS-1427 00 KAIG3-RFI-SW-LS-1427-00
KAIG3-RFI-SW-C-6446 00 KAIG3-RFI-SW-C-6446-00
KAIG3-RFI-BO-E-0516 00 KAIG3-RFI-BO-E-0516-00
KAIG3-RFI-SW-C-6445 00 KAIG3-RFI-SW-C-6445-00
KAIG3-RFI-PC-S-7825 00 KAIG3-RFI-PC-S-7825-00
KAIG3-RFI-SW-C-6429 00 KAIG3-RFI-SW-C-6429-00
KAIG3-RFI-SW-C-6428 00 KAIG3-RFI-SW-C-6428-00
KAIG3-RFI-PC-S-7812 00 KAIG3-RFI-PC-S-7812-00
KAIG3-RFI-CO-C-6386 00 KAIG3-RFI-CO-C-6386-00
KAIG3-RFI-PC-S-8241 00 KAIG3-RFI-PC-S-8241-00
KAIG3-RFI-LM-S-8231 00 KAIG3-RFI-LM-S-8231-00
KAIG3-RFI-LM-S-8230 00 KAIG3-RFI-LM-S-8230-00
KAIG3-RFI-PG-C-6088 00 KAIG3-RFI-PG-C-6088-00
KAIG3-RFI-MC-S-8244 00 KAIG3-RFI-MC-S-8244-00
KAIG3-RFI-DG-C-6085 00 KAIG3-RFI-DG-C-6085-00
KAIG3-RFI-MC-C-6388 00 KAIG3-RFI-MC-C-6388-00
KAIG3-RFI-CO-S-8154 00 KAIG3-RFI-CO-S-8154-00
KAIG3-RFI-CO-SU-2741 00 KAIG3-RFI-CO-SU-2741-00
KAIG3-RFI-CO-S-8220 00 KAIG3-RFI-CO-S-8220-00
KAIG3-RFI-CO-S-8221 00 KAIG3-RFI-CO-S-8221-00
KAIG3-RFI-CO-SU-2742 00 KAIG3-RFI-CO-SU-2742-00
KAIG3-RFI-CO-C-6382 00 KAIG3-RFI-CO-C-6382-00
KAIG3-RFI-BO-E-0507 01 KAIG3-RFI-BO-E-0507-01
KAIG3-RFI-BO-E-0511 00 KAIG3-RFI-BO-E-0511-00
KAIG3-RFI-PA-SS-0357 00 KAIG3-RFI-PA-SS-0357-00
KAIG3-RFI-CO-SU-2745 00 KAIG3-RFI-CO-SU-2745-00
KAIG3-RFI-CO-S-8229 00 KAIG3-RFI-CO-S-8229-00
KAIG3-RFI-CO-S-8228 00 KAIG3-RFI-CO-S-8228-00
KAIG3-RFI-CO-S-8227 00 KAIG3-RFI-CO-S-8227-00
KAIG3-RFI-SW-E-0515 00 KAIG3-RFI-SW-E-0515-00
KAIG3-RFI-ZG-C-6421 00 KAIG3-RFI-ZG-C-6421-00
KAIG3-RFI-MB-A-0960 00 KAIG3-RFI-MB-A-0960-00
KAIG3-RFI-PT-A-0959 00 KAIG3-RFI-PT-A-0959-00
KAIG3-RFI-PT-A-0958 00 KAIG3-RFI-PT-A-0958-00
KAIG3-RFI-EC-SU-2744 00 KAIG3-RFI-EC-SU-2744-00
KAIG3-RFI-EC-S-8226 00 KAIG3-RFI-EC-S-8226-00
KAIG3-RFI-WG-S-8225 00 KAIG3-RFI-WG-S-8225-00
KAIG3-RFI-SW-C-6417 00 KAIG3-RFI-SW-C-6417-00
KAIG3-RFI-SW-C-6416 00 KAIG3-RFI-SW-C-6416-00
KAIG3-RFI-SW-C-6415 00 KAIG3-RFI-SW-C-6415-00
KAIG3-RFI-SW-C-6414 00 KAIG3-RFI-SW-C-6414-00
KAIG3-RFI-SW-C-6411 00 KAIG3-RFI-SW-C-6411-00
KAIG3-RFI-SW-C-6410 00 KAIG3-RFI-SW-C-6410-00
KAIG3-RFI-SW-C-6409 00 KAIG3-RFI-SW-C-6409-00
KAIG3-RFI-SW-C-6405 00 KAIG3-RFI-SW-C-6405-00
KAIG3-RFI-SW-C-6404 00 KAIG3-RFI-SW-C-6404-00
KAIG3-RFI-SW-C-6403 00 KAIG3-RFI-SW-C-6403-00
KAIG3-RFI-SW-C-6402 00 KAIG3-RFI-SW-C-6402-00
KAIG3-RFI-SW-C-6401 00 KAIG3-RFI-SW-C-6401-00
KAIG3-RFI-SW-C-6400 00 KAIG3-RFI-SW-C-6400-00
KAIG3-RFI-SW-C-6399 00 KAIG3-RFI-SW-C-6399-00
KAIG3-RFI-SW-C-6390 00 KAIG3-RFI-SW-C-6390-00
KAIG3-RFI-SW-C-6080 01 KAIG3-RFI-SW-C-6080-01
KAIG3-RFI-CO-SS-0349 00 KAIG3-RFI-CO-SS-0349-00
KAIG3-RFI-CO-SS-0352 00 KAIG3-RFI-CO-SS-0352-00
KAIG3-RFI-CO-SS-0354 00 KAIG3-RFI-CO-SS-0354-00
KAIG3-RFI-CO-SS-0355 00 KAIG3-RFI-CO-SS-0355-00
KAIG3-RFI-WG-LS-1426 00 KAIG3-RFI-WG-LS-1426-00
KAIG3-RFI-PC-P-0259 00 KAIG3-RFI-PC-P-0259-00
KAIG3-RFI-PC-P-0258 00 KAIG3-RFI-PC-P-0258-00
KAIG3-RFI-SW-C-6398 00 KAIG3-RFI-SW-C-6398-00
KAIG3-RFI-SW-C-6397 00 KAIG3-RFI-SW-C-6397-00
KAIG3-RFI-SW-C-6395 00 KAIG3-RFI-SW-C-6395-00
KAIG3-RFI-SW-C-6394 00 KAIG3-RFI-SW-C-6394-00
KAIG3-RFI-SW-C-6393 00 KAIG3-RFI-SW-C-6393-00
KAIG3-RFI-SW-C-6389 00 KAIG3-RFI-SW-C-6389-00
KAIG3-RFI-SW-C-6388 00 KAIG3-RFI-SW-C-6388-00
KAIG3-RFI-SW-C-6387 00 KAIG3-RFI-SW-C-6387-00
KAIG3-RFI-SW-C-6386 00 KAIG3-RFI-SW-C-6386-00
KAIG3-RFI-SW-C-6385 00 KAIG3-RFI-SW-C-6385-00
KAIG3-RFI-SW-C-6384 00 KAIG3-RFI-SW-C-6384-00
KAIG3-RFI-SW-C-6383 00 KAIG3-RFI-SW-C-6383-00
KAIG3-RFI-SW-C-6381 00 KAIG3-RFI-SW-C-6381-00
KAIG3-RFI-SW-C-5713 01 KAIG3-RFI-SW-C-5713-01
KAIG3-RFI-SW-C-5712 01 KAIG3-RFI-SW-C-5712-01
KAIG3-RFI-TG-C-6392 00 KAIG3-RFI-TG-C-6392-00
KAIG3-RFI-MB-A-0948 01 KAIG3-RFI-MB-A-0948-01
KAIG3-RFI-PT-A-0957 00 KAIG3-RFI-PT-A-0957-00
KAIG3-RFI-PT-A-0956 00 KAIG3-RFI-PT-A-0956-00
KAIG3-RFI-TG-SU-2743 00 KAIG3-RFI-TG-SU-2743-00
KAIG3-RFI-AG-S-8219 00 KAIG3-RFI-AG-S-8219-00
KAIG3-RFI-MB-S-8218 00 KAIG3-RFI-MB-S-8218-00
KAIG3-RFI-AG-S-8217 00 KAIG3-RFI-AG-S-8217-00
KAIG3-RFI-EC-S-8216 00 KAIG3-RFI-EC-S-8216-00
KAIG3-RFI-TG-S-8215 00 KAIG3-RFI-TG-S-8215-00
KAIG3-RFI-TG-S-8214 00 KAIG3-RFI-TG-S-8214-00
KAIG3-RFI-CC-C-5549 01 KAIG3-RFI-CC-C-5549-01
KAIG3-RFI-SW-C-6380 00 KAIG3-RFI-SW-C-6380-00
KAIG3-RFI-SW-C-6379 00 KAIG3-RFI-SW-C-6379-00
KAIG3-RFI-SW-C-6378 00 KAIG3-RFI-SW-C-6378-00
KAIG3-RFI-SW-C-6377 00 KAIG3-RFI-SW-C-6377-00
KAIG3-RFI-SW-C-6376 00 KAIG3-RFI-SW-C-6376-00
KAIG3-RFI-SW-C-6373 00 KAIG3-RFI-SW-C-6373-00
KAIG3-RFI-SW-C-6372 00 KAIG3-RFI-SW-C-6372-00
KAIG3-RFI-SW-C-6365 00 KAIG3-RFI-SW-C-6365-00
KAIG3-RFI-SW-C-6364 00 KAIG3-RFI-SW-C-6364-00
KAIG3-RFI-SW-C-6363 00 KAIG3-RFI-SW-C-6363-00
KAIG3-RFI-SW-C-6362 00 KAIG3-RFI-SW-C-6362-00
KAIG3-RFI-SW-C-6361 00 KAIG3-RFI-SW-C-6361-00
KAIG3-RFI-SW-C-6360 00 KAIG3-RFI-SW-C-6360-00
KAIG3-RFI-SW-C-6358 00 KAIG3-RFI-SW-C-6358-00
KAIG3-RFI-SW-C-6357 00 KAIG3-RFI-SW-C-6357-00
KAIG3-RFI-SW-C-6356 00 KAIG3-RFI-SW-C-6356-00
KAIG3-RFI-SW-C-6355 00 KAIG3-RFI-SW-C-6355-00
KAIG3-RFI-SW-C-6354 00 KAIG3-RFI-SW-C-6354-00
KAIG3-RFI-SW-C-6353 00 KAIG3-RFI-SW-C-6353-00
KAIG3-RFI-SW-C-6352 00 KAIG3-RFI-SW-C-6352-00
KAIG3-RFI-SW-C-6351 00 KAIG3-RFI-SW-C-6351-00
KAIG3-RFI-SW-C-6350 00 KAIG3-RFI-SW-C-6350-00
KAIG3-RFI-SW-C-6349 00 KAIG3-RFI-SW-C-6349-00
KAIG3-RFI-SW-C-6348 00 KAIG3-RFI-SW-C-6348-00
KAIG3-RFI-SW-C-6347 00 KAIG3-RFI-SW-C-6347-00
KAIG3-RFI-SW-C-6346 00 KAIG3-RFI-SW-C-6346-00
KAIG3-RFI-SW-C-6345 00 KAIG3-RFI-SW-C-6345-00
KAIG3-RFI-SW-C-6344 00 KAIG3-RFI-SW-C-6344-00
KAIG3-RFI-WG-C-6025 01 KAIG3-RFI-WG-C-6025-01
KAIG3-RFI-ZG-C-6371 00 KAIG3-RFI-ZG-C-6371-00
KAIG3-RFI-SG-C-6370 00 KAIG3-RFI-SG-C-6370-00
KAIG3-RFI-WG-C-6369 00 KAIG3-RFI-WG-C-6369-00
KAIG3-RFI-WG-C-6368 00 KAIG3-RFI-WG-C-6368-00
KAIG3-RFI-WG-S-8211 00 KAIG3-RFI-WG-S-8211-00
KAIG3-RFI-PT-A-0955 00 KAIG3-RFI-PT-A-0955-00
KAIG3-RFI-MB-A-0954 00 KAIG3-RFI-MB-A-0954-00
KAIG3-RFI-PT-A-0953 00 KAIG3-RFI-PT-A-0953-00
KAIG3-RFI-PT-A-0952 00 KAIG3-RFI-PT-A-0952-00
KAIG3-RFI-MB-A-0951 00 KAIG3-RFI-MB-A-0951-00
KAIG3-RFI-CO-S-8213 00 KAIG3-RFI-CO-S-8213-00
KAIG3-RFI-CO-S-8212 00 KAIG3-RFI-CO-S-8212-00
KAIG3-RFI-CO-C-6375 00 KAIG3-RFI-CO-C-6375-00
KAIG3-RFI-CO-C-6367 00 KAIG3-RFI-CO-C-6367-00
KAIG3-RFI-CO-C-6366 00 KAIG3-RFI-CO-C-6366-00
KAIG3-RFI-CO-SU-2740 00 KAIG3-RFI-CO-SU-2740-00
KAIG3-RFI-CO-S-8179 00 KAIG3-RFI-CO-S-8179-00
KAIG3-RFI-CO-S-8210 00 KAIG3-RFI-CO-S-8210-00
KAIG3-RFI-SW-C-6343 00 KAIG3-RFI-SW-C-6343-00
KAIG3-RFI-SW-C-6342 00 KAIG3-RFI-SW-C-6342-00
KAIG3-RFI-SW-C-6335 00 KAIG3-RFI-SW-C-6335-00
KAIG3-RFI-SW-C-6334 00 KAIG3-RFI-SW-C-6334-00
KAIG3-RFI-SW-C-6333 00 KAIG3-RFI-SW-C-6333-00
KAIG3-RFI-SW-C-6324 00 KAIG3-RFI-SW-C-6324-00
KAIG3-RFI-SW-C-6323 00 KAIG3-RFI-SW-C-6323-00
KAIG3-RFI-WG-LC-0704 00 KAIG3-RFI-WG-LC-0704-00
KAIG3-RFI-WG-LC-0703 00 KAIG3-RFI-WG-LC-0703-00
KAIG3-RFI-PT-LC-0702 00 KAIG3-RFI-PT-LC-0702-00
KAIG3-RFI-LM-LC-0697 00 KAIG3-RFI-LM-LC-0697-00
KAIG3-RFI-LM-LC-0696 00 KAIG3-RFI-LM-LC-0696-00
KAIG3-RFI-LM-LC-0695 00 KAIG3-RFI-LM-LC-0695-00
KAIG3-RFI-LM-E-0509-00 00 KAIG3-RFI-LM-E-0509-00-00
KAIG3-RFI-LM-E-0510 00 KAIG3-RFI-LM-E-0510-00
KAIG3-RFI-WG-E-0514 00 KAIG3-RFI-WG-E-0514-00
KAIG3-RFI-WG-E-0513 00 KAIG3-RFI-WG-E-0513-00
KAIG3-RFI-PT-E-0512 00 KAIG3-RFI-PT-E-0512-00
KAIG3-RFI-CO-SS-0353 00 KAIG3-RFI-CO-SS-0353-00
KAIG3-RFI-EC-SU-2739 00 KAIG3-RFI-EC-SU-2739-00
KAIG3-RFI-EC-SU-2738 00 KAIG3-RFI-EC-SU-2738-00
KAIG3-RFI-EC-S-8208 00 KAIG3-RFI-EC-S-8208-00
KAIG3-RFI-EC-S-8207 00 KAIG3-RFI-EC-S-8207-00
KAIG3-RFI-TG-S-8206 00 KAIG3-RFI-TG-S-8206-00
KAIG3-RFI-TG-S-8205 00 KAIG3-RFI-TG-S-8205-00
KAIG3-RFI-TG-S-8204 00 KAIG3-RFI-TG-S-8204-00
KAIG3-RFI-PG-LS-1425 00 KAIG3-RFI-PG-LS-1425-00
KAIG3-RFI-PT-A-0950 00 KAIG3-RFI-PT-A-0950-00
KAIG3-RFI-PT-A-0949 00 KAIG3-RFI-PT-A-0949-00
KAIG3-RFI-CO-C-6338 00 KAIG3-RFI-CO-C-6338-00
KAIG3-RFI-CO-S-8199 00 KAIG3-RFI-CO-S-8199-00
KAIG3-RFI-MC-C-6341 00 KAIG3-RFI-MC-C-6341-00
KAIG3-RFI-MC-C-6340 00 KAIG3-RFI-MC-C-6340-00
KAIG3-RFI-MC-C-6297 00 KAIG3-RFI-MC-C-6297-00
KAIG3-RFI-MC-C-6339 00 KAIG3-RFI-MC-C-6339-00
KAIG3-RFI-SW-C-6332 00 KAIG3-RFI-SW-C-6332-00
KAIG3-RFI-SW-C-6331 00 KAIG3-RFI-SW-C-6331-00
KAIG3-RFI-SW-C-6330 00 KAIG3-RFI-SW-C-6330-00
KAIG3-RFI-SW-C-6329 00 KAIG3-RFI-SW-C-6329-00
KAIG3-RFI-SW-C-6328 00 KAIG3-RFI-SW-C-6328-00
KAIG3-RFI-SW-C-6327 00 KAIG3-RFI-SW-C-6327-00
KAIG3-RFI-SW-C-6326 00 KAIG3-RFI-SW-C-6326-00
KAIG3-RFI-SW-C-6325 00 KAIG3-RFI-SW-C-6325-00
KAIG3-RFI-SW-C-6315 00 KAIG3-RFI-SW-C-6315-00
KAIG3-RFI-SW-C-6314 00 KAIG3-RFI-SW-C-6314-00
KAIG3-RFI-SW-C-6313 00 KAIG3-RFI-SW-C-6313-00
KAIG3-RFI-SW-C-6305 00 KAIG3-RFI-SW-C-6305-00
KAIG3-RFI-SW-C-6304 00 KAIG3-RFI-SW-C-6304-00
KAIG3-RFI-SW-C-6057 01 KAIG3-RFI-SW-C-6057-01
KAIG3-RFI-SW-C-6056 01 KAIG3-RFI-SW-C-6056-01
KAIG3-RFI-SW-C-5942 01 KAIG3-RFI-SW-C-5942-01
KAIG3-RFI-SW-C-5911 01 KAIG3-RFI-SW-C-5911-01
KAIG3-RFI-CO-C-6337 00 KAIG3-RFI-CO-C-6337-00
KAIG3-RFI-CO-SU-2737 00 KAIG3-RFI-CO-SU-2737-00
KAIG3-RFI-CO-C-6336 00 KAIG3-RFI-CO-C-6336-00
KAIG3-RFI-CO-S-8202 00 KAIG3-RFI-CO-S-8202-00
KAIG3-RFI-CO-S-8198 00 KAIG3-RFI-CO-S-8198-00
KAIG3-RFI-CO-SU-2736 00 KAIG3-RFI-CO-SU-2736-00
KAIG3-RFI-WG-LS-1005 01 KAIG3-RFI-WG-LS-1005-01
KAIG3-RFI-WG-LS-1174 01 KAIG3-RFI-WG-LS-1174-01
KAIG3-RFI-CO-S-8200 00 KAIG3-RFI-CO-S-8200-00
KAIG3-RFI-ZG-C-6319 00 KAIG3-RFI-ZG-C-6319-00
KAIG3-RFI-ZG-C-6318 00 KAIG3-RFI-ZG-C-6318-00
KAIG3-RFI-TG-C-6322 00 KAIG3-RFI-TG-C-6322-00
KAIG3-RFI-CO-S-8197 00 KAIG3-RFI-CO-S-8197-00
KAIG3-RFI-CO-S-8196 00 KAIG3-RFI-CO-S-8196-00
KAIG3-RFI-WG-C-6301 00 KAIG3-RFI-WG-C-6301-00
KAIG3-RFI-CO-S-8195 00 KAIG3-RFI-CO-S-8195-00
KAIG3-RFI-CO-S-8194 00 KAIG3-RFI-CO-S-8194-00
KAIG3-RFI-CO-S-8193 00 KAIG3-RFI-CO-S-8193-00
KAIG3-RFI-MB-A-0948 00 KAIG3-RFI-MB-A-0948-00
KAIG3-RFI-CO-S-8192 00 KAIG3-RFI-CO-S-8192-00
KAIG3-RFI-ZG-C-6317 00 KAIG3-RFI-ZG-C-6317-00
KAIG3-RFI-ZG-C-6316 00 KAIG3-RFI-ZG-C-6316-00
KAIG3-RFI-MC-C-6296 00 KAIG3-RFI-MC-C-6296-00
KAIG3-RFI-CO-S-8184 00 KAIG3-RFI-CO-S-8184-00
KAIG3-RFI-WG-C-6300 00 KAIG3-RFI-WG-C-6300-00
KAIG3-RFI-PG-C-6299 00 KAIG3-RFI-PG-C-6299-00
KAIG3-RFI-PG-C-6298 00 KAIG3-RFI-PG-C-6298-00
KAIG3-RFI-MB-S-8186 00 KAIG3-RFI-MB-S-8186-00
KAIG3-RFI-EC-S-8185 00 KAIG3-RFI-EC-S-8185-00
KAIG3-RFI-EC-SU-2733 00 KAIG3-RFI-EC-SU-2733-00
KAIG3-RFI-LM-LC-0701 00 KAIG3-RFI-LM-LC-0701-00
KAIG3-RFI-LM-LC-0700 00 KAIG3-RFI-LM-LC-0700-00
KAIG3-RFI-SW-C-6312 00 KAIG3-RFI-SW-C-6312-00
KAIG3-RFI-SW-C-6311 00 KAIG3-RFI-SW-C-6311-00
KAIG3-RFI-SW-C-6310 00 KAIG3-RFI-SW-C-6310-00
KAIG3-RFI-SW-C-6309 00 KAIG3-RFI-SW-C-6309-00
KAIG3-RFI-SW-C-6308 00 KAIG3-RFI-SW-C-6308-00
KAIG3-RFI-SW-C-6307 00 KAIG3-RFI-SW-C-6307-00
KAIG3-RFI-SW-C-6306 00 KAIG3-RFI-SW-C-6306-00
KAIG3-RFI-SW-C-6303 00 KAIG3-RFI-SW-C-6303-00
KAIG3-RFI-SW-C-6302 00 KAIG3-RFI-SW-C-6302-00
KAIG3-RFI-SW-C-6295 00 KAIG3-RFI-SW-C-6295-00
KAIG3-RFI-SW-C-6294 00 KAIG3-RFI-SW-C-6294-00
KAIG3-RFI-SW-C-6293 00 KAIG3-RFI-SW-C-6293-00
KAIG3-RFI-SW-C-6292 00 KAIG3-RFI-SW-C-6292-00
KAIG3-RFI-SW-C-6291 00 KAIG3-RFI-SW-C-6291-00
KAIG3-RFI-SW-C-6290 00 KAIG3-RFI-SW-C-6290-00
KAIG3-RFI-SW-C-6289 00 KAIG3-RFI-SW-C-6289-00
KAIG3-RFI-SW-C-6288 00 KAIG3-RFI-SW-C-6288-00
KAIG3-RFI-SW-C-6287 00 KAIG3-RFI-SW-C-6287-00
KAIG3-RFI-CO-S-8065 00 KAIG3-RFI-CO-S-8065-00
KAIG3-RFI-SW-C-6286 00 KAIG3-RFI-SW-C-6286-00
KAIG3-RFI-SW-C-6012 01 KAIG3-RFI-SW-C-6012-01
KAIG3-RFI-SW-C-5969 01 KAIG3-RFI-SW-C-5969-01
KAIG3-RFI-SW-C-5910 01 KAIG3-RFI-SW-C-5910-01
KAIG3-RFI-SW-C-6321 00 KAIG3-RFI-SW-C-6321-00
KAIG3-RFI-SW-C-6320 00 KAIG3-RFI-SW-C-6320-00
KAIG3-RFI-CO-SU-2732 00 KAIG3-RFI-CO-SU-2732-00
KAIG3-RFI-CO-SU-2731 00 KAIG3-RFI-CO-SU-2731-00
KAIG3-RFI-CO-S-8182 00 KAIG3-RFI-CO-S-8182-00
KAIG3-RFI-CO-S-8181 00 KAIG3-RFI-CO-S-8181-00
KAIG3-RFI-CO-SU-2734 00 KAIG3-RFI-CO-SU-2734-00
KAIG3-RFI-CO-S-8178 00 KAIG3-RFI-CO-S-8178-00
KAIG3-RFI-CO-S-8177 00 KAIG3-RFI-CO-S-8177-00
KAIG3-RFI-CO-S-8187 00 KAIG3-RFI-CO-S-8187-00
KAIG3-RFI-CO-S-8133 00 KAIG3-RFI-CO-S-8133-00
KAIG3-RFI-CO-S-8188 00 KAIG3-RFI-CO-S-8188-00
KAIG3-RFI-CO-S-8189 00 KAIG3-RFI-CO-S-8189-00
KAIG3-RFI-LM-S-8183 00 KAIG3-RFI-LM-S-8183-00
KAIG3-RFI-CO-S-8132 00 KAIG3-RFI-CO-S-8132-00
KAIG3-RFI-CO-S-8131 00 KAIG3-RFI-CO-S-8131-00
KAIG3-RFI-CO-S-7930 00 KAIG3-RFI-CO-S-7930-00
KAIG3-RFI-SW-C-5887 00 KAIG3-RFI-SW-C-5887-00
KAIG3-RFI-CO-SS-0348 00 KAIG3-RFI-CO-SS-0348-00
KAIG3-RFI-SW-C-6279 00 KAIG3-RFI-SW-C-6279-00
KAIG3-RFI-SW-C-6278 00 KAIG3-RFI-SW-C-6278-00
KAIG3-RFI-SM-S-8015 01 KAIG3-RFI-SM-S-8015-01
KAIG3-RFI-MC-S-8164 00 KAIG3-RFI-MC-S-8164-00
KAIG3-RFI-SM-S-8017 00 KAIG3-RFI-SM-S-8017-00
KAIG3-RFI-MC-S-8172 00 KAIG3-RFI-MC-S-8172-00
KAIG3-RFI-CO-SU-2647 01 KAIG3-RFI-CO-SU-2647-01
KAIG3-RFI-CO-S-8180 00 KAIG3-RFI-CO-S-8180-00
KAIG3-RFI-CO-SU-2730 00 KAIG3-RFI-CO-SU-2730-00
KAIG3-RFI-CO-S-8171 00 KAIG3-RFI-CO-S-8171-00
KAIG3-RFI-MC-C-6261 00 KAIG3-RFI-MC-C-6261-00
KAIG3-RFI-MC-C-6262 00 KAIG3-RFI-MC-C-6262-00
KAIG3-RFI-CO-SU-2648 01 KAIG3-RFI-CO-SU-2648-01
KAIG3-RFI-MC-C-6260 00 KAIG3-RFI-MC-C-6260-00
KAIG3-RFI-MC-S-8165 00 KAIG3-RFI-MC-S-8165-00
KAIG3-RFI-MC-C-6258 00 KAIG3-RFI-MC-C-6258-00
KAIG3-RFI-CO-S-8168 00 KAIG3-RFI-CO-S-8168-00
KAIG3-RFI-CO-S-8167 00 KAIG3-RFI-CO-S-8167-00
KAIG3-RFI-CO-S-8166 00 KAIG3-RFI-CO-S-8166-00
KAIG3-RFI-CO-S-8170 00 KAIG3-RFI-CO-S-8170-00
KAIG3-RFI-CO-S-8169 00 KAIG3-RFI-CO-S-8169-00
KAIG3-RFI-CO-SU-2728 00 KAIG3-RFI-CO-SU-2728-00
KAIG3-RFI-CO-C-6257 00 KAIG3-RFI-CO-C-6257-00
KAIG3-RFI-MB-LC-0699 00 KAIG3-RFI-MB-LC-0699-00
KAIG3-RFI-SW-C-6285 00 KAIG3-RFI-SW-C-6285-00
KAIG3-RFI-SW-C-6284 00 KAIG3-RFI-SW-C-6284-00
KAIG3-RFI-TG-S-8175 00 KAIG3-RFI-TG-S-8175-00
KAIG3-RFI-SW-C-6283 00 KAIG3-RFI-SW-C-6283-00
KAIG3-RFI-TG-S-8174 00 KAIG3-RFI-TG-S-8174-00
KAIG3-RFI-EC-S-8173 00 KAIG3-RFI-EC-S-8173-00
KAIG3-RFI-SW-C-6281 00 KAIG3-RFI-SW-C-6281-00
KAIG3-RFI-EC-SU-2729 00 KAIG3-RFI-EC-SU-2729-00
KAIG3-RFI-PG-C-6277 00 KAIG3-RFI-PG-C-6277-00
KAIG3-RFI-PG-C-6276 00 KAIG3-RFI-PG-C-6276-00
KAIG3-RFI-WG-C-6264 00 KAIG3-RFI-WG-C-6264-00
KAIG3-RFI-SW-C-6280 00 KAIG3-RFI-SW-C-6280-00
KAIG3-RFI-WG-C-6263 00 KAIG3-RFI-WG-C-6263-00
KAIG3-RFI-SW-C-6275 00 KAIG3-RFI-SW-C-6275-00
KAIG3-RFI-SW-C-6274 00 KAIG3-RFI-SW-C-6274-00
KAIG3-RFI-SW-C-6273 00 KAIG3-RFI-SW-C-6273-00
KAIG3-RFI-SW-C-6272 00 KAIG3-RFI-SW-C-6272-00
KAIG3-RFI-SW-C-6271 00 KAIG3-RFI-SW-C-6271-00
KAIG3-RFI-SW-C-6270 00 KAIG3-RFI-SW-C-6270-00
KAIG3-RFI-SW-C-6269 00 KAIG3-RFI-SW-C-6269-00
KAIG3-RFI-SW-C-6268 00 KAIG3-RFI-SW-C-6268-00
KAIG3-RFI-SW-C-6267 00 KAIG3-RFI-SW-C-6267-00
KAIG3-RFI-SW-C-6266 00 KAIG3-RFI-SW-C-6266-00
KAIG3-RFI-SW-C-6265 00 KAIG3-RFI-SW-C-6265-00
KAIG3-RFI-SW-C-6238 00 KAIG3-RFI-SW-C-6238-00
KAIG3-RFI-SW-C-5943 01 KAIG3-RFI-SW-C-5943-01
KAIG3-RFI-CO-S-8110 00 KAIG3-RFI-CO-S-8110-00
KAIG3-RFI-CO-SS-0346 00 KAIG3-RFI-CO-SS-0346-00
KAIG3-RFI-CO-SS-0330 00 KAIG3-RFI-CO-SS-0330-00
KAIG3-RFI-MC-SU-2713 00 KAIG3-RFI-MC-SU-2713-00
KAIG3-RFI-AG-A-0937 00 KAIG3-RFI-AG-A-0937-00
KAIG3-RFI-SW-C-6256 00 KAIG3-RFI-SW-C-6256-00
KAIG3-RFI-SW-C-6255 00 KAIG3-RFI-SW-C-6255-00
KAIG3-RFI-SW-C-6245 00 KAIG3-RFI-SW-C-6245-00
KAIG3-RFI-SW-C-6244 00 KAIG3-RFI-SW-C-6244-00
KAIG3-RFI-SW-C-6243 00 KAIG3-RFI-SW-C-6243-00
KAIG3-RFI-SW-C-6242 00 KAIG3-RFI-SW-C-6242-00
KAIG3-RFI-SW-C-6241 00 KAIG3-RFI-SW-C-6241-00
KAIG3-RFI-SW-C-6240 00 KAIG3-RFI-SW-C-6240-00
KAIG3-RFI-SW-C-6237 00 KAIG3-RFI-SW-C-6237-00
KAIG3-RFI-SW-C-6236 00 KAIG3-RFI-SW-C-6236-00
KAIG3-RFI-SW-C-6235 00 KAIG3-RFI-SW-C-6235-00
KAIG3-RFI-SW-C-6234 00 KAIG3-RFI-SW-C-6234-00
KAIG3-RFI-SW-C-6233 00 KAIG3-RFI-SW-C-6233-00
KAIG3-RFI-SW-C-6232 00 KAIG3-RFI-SW-C-6232-00
KAIG3-RFI-SW-C-6231 00 KAIG3-RFI-SW-C-6231-00
KAIG3-RFI-SW-C-6230 00 KAIG3-RFI-SW-C-6230-00
KAIG3-RFI-SW-C-6229 00 KAIG3-RFI-SW-C-6229-00
KAIG3-RFI-SW-C-6206 00 KAIG3-RFI-SW-C-6206-00
KAIG3-RFI-SW-C-5627 01 KAIG3-RFI-SW-C-5627-01
KAIG3-RFI-WG-S-8163 00 KAIG3-RFI-WG-S-8163-00
KAIG3-RFI-EC-S-8162 00 KAIG3-RFI-EC-S-8162-00
KAIG3-RFI-PG-S-8161 00 KAIG3-RFI-PG-S-8161-00
KAIG3-RFI-TB-S-8160 00 KAIG3-RFI-TB-S-8160-00
KAIG3-RFI-WG-SU-2727 00 KAIG3-RFI-WG-SU-2727-00
KAIG3-RFI-PG-SU-2726 00 KAIG3-RFI-PG-SU-2726-00
KAIG3-RFI-TB-SU-2725 00 KAIG3-RFI-TB-SU-2725-00
KAIG3-RFI-MB-A-0936 00 KAIG3-RFI-MB-A-0936-00
KAIG3-RFI-SW-A-0935 00 KAIG3-RFI-SW-A-0935-00
KAIG3-RFI-PG-C-6254 00 KAIG3-RFI-PG-C-6254-00
KAIG3-RFI-PG-C-6253 00 KAIG3-RFI-PG-C-6253-00
KAIG3-RFI-WG-C-6252 00 KAIG3-RFI-WG-C-6252-00
KAIG3-RFI-SG-C-6251 00 KAIG3-RFI-SG-C-6251-00
KAIG3-RFI-SG-C-6250 00 KAIG3-RFI-SG-C-6250-00
KAIG3-RFI-WG-C-6249 00 KAIG3-RFI-WG-C-6249-00
KAIG3-RFI-CF-P-0257 00 KAIG3-RFI-CF-P-0257-00
KAIG3-RFI-PC-P-0256 00 KAIG3-RFI-PC-P-0256-00
KAIG3-RFI-MC-C-6247 00 KAIG3-RFI-MC-C-6247-00
KAIG3-RFI-MC-C-6246 00 KAIG3-RFI-MC-C-6246-00
KAIG3-RFI-CO-C-6248 00 KAIG3-RFI-CO-C-6248-00
KAIG3-RFI-CO-S-8156 00 KAIG3-RFI-CO-S-8156-00
KAIG3-RFI-CO-SU-2723 00 KAIG3-RFI-CO-SU-2723-00
KAIG3-RFI-CO-S-8155 00 KAIG3-RFI-CO-S-8155-00
KAIG3-RFI-CO-SU-2722 00 KAIG3-RFI-CO-SU-2722-00
KAIG3-RFI-MC-S-8150-00 00 KAIG3-RFI-MC-S-8150-00-00
KAIG3-RFI-CO-S-8151 00 KAIG3-RFI-CO-S-8151-00
KAIG3-RFI-MC-S-8149 00 KAIG3-RFI-MC-S-8149-00
KAIG3-RFI-MC-SU-2721 00 KAIG3-RFI-MC-SU-2721-00
KAIG3-RFI-CO-S-8152 00 KAIG3-RFI-CO-S-8152-00
KAIG3-RFI-CO-SU-2724 00 KAIG3-RFI-CO-SU-2724-00
KAIG3-RFI-CO-S-8158 00 KAIG3-RFI-CO-S-8158-00
KAIG3-RFI-CO-S-8157 00 KAIG3-RFI-CO-S-8157-00
KAIG3-RFI-CO-S-8128 00 KAIG3-RFI-CO-S-8128-00
KAIG3-RFI-CO-S-8127 00 KAIG3-RFI-CO-S-8127-00
KAIG3-RFI-CO-SU-2712 00 KAIG3-RFI-CO-SU-2712-00
KAIG3-RFI-PC-S-8125 00 KAIG3-RFI-PC-S-8125-00
KAIG3-RFI-PC-S-8124 00 KAIG3-RFI-PC-S-8124-00
KAIG3-RFI-CO-S-8126 00 KAIG3-RFI-CO-S-8126-00
KAIG3-RFI-PC-S-8123 00 KAIG3-RFI-PC-S-8123-00
KAIG3-RFI-CO-S-8122 00 KAIG3-RFI-CO-S-8122-00
KAIG3-RFI-CO-S-8118 00 KAIG3-RFI-CO-S-8118-00
KAIG3-RFI-CO-S-8119 00 KAIG3-RFI-CO-S-8119-00
KAIG3-RFI-LM-S-8120 00 KAIG3-RFI-LM-S-8120-00
KAIG3-RFI-BO-E-0507 00 KAIG3-RFI-BO-E-0507-00
KAIG3-RFI-CO-S-7763 00 KAIG3-RFI-CO-S-7763-00
KAIG3-RFI-CO-SS-0351 00 KAIG3-RFI-CO-SS-0351-00
KAIG3-RFI-CO-SS-0350 00 KAIG3-RFI-CO-SS-0350-00
KAIG3-RFI-CO-SS-0342 00 KAIG3-RFI-CO-SS-0342-00
KAIG3-RFI-SW-LS-1419 01 KAIG3-RFI-SW-LS-1419-01
KAIG3-RFI-CO-SS-0343 00 KAIG3-RFI-CO-SS-0343-00
KAIG3-RFI-CO-SS-0341 00 KAIG3-RFI-CO-SS-0341-00
KAIG3-RFI-CO-SS-0345 00 KAIG3-RFI-CO-SS-0345-00
KAIG3-RFI-CO-SS-0340 00 KAIG3-RFI-CO-SS-0340-00
KAIG3-RFI-CO-SS-0338 00 KAIG3-RFI-CO-SS-0338-00
KAIG3-RFI-AG-SS-0323 00 KAIG3-RFI-AG-SS-0323-00
KAIG3-RFI-CO-SS-0322 00 KAIG3-RFI-CO-SS-0322-00
KAIG3-RFI-MC-S-7243 01 KAIG3-RFI-MC-S-7243-01
KAIG3-RFI-SW-C-6189 00 KAIG3-RFI-SW-C-6189-00
KAIG3-RFI-SW-P-0255 00 KAIG3-RFI-SW-P-0255-00
KAIG3-RFI-SW-P-0254 00 KAIG3-RFI-SW-P-0254-00
KAIG3-RFI-SW-C-6202 00 KAIG3-RFI-SW-C-6202-00
KAIG3-RFI-SW-C-6201 00 KAIG3-RFI-SW-C-6201-00
KAIG3-RFI-SW-C-6186 00 KAIG3-RFI-SW-C-6186-00
KAIG3-RFI-SW-C-6185 00 KAIG3-RFI-SW-C-6185-00
KAIG3-RFI-SW-C-6200 00 KAIG3-RFI-SW-C-6200-00
KAIG3-RFI-SW-C-6228 00 KAIG3-RFI-SW-C-6228-00
KAIG3-RFI-SW-C-6227 00 KAIG3-RFI-SW-C-6227-00
KAIG3-RFI-SW-C-6225 00 KAIG3-RFI-SW-C-6225-00
KAIG3-RFI-SW-C-6224 00 KAIG3-RFI-SW-C-6224-00
KAIG3-RFI-SW-C-6223 00 KAIG3-RFI-SW-C-6223-00
KAIG3-RFI-SW-C-6222 00 KAIG3-RFI-SW-C-6222-00
KAIG3-RFI-SW-C-6221 00 KAIG3-RFI-SW-C-6221-00
KAIG3-RFI-SW-C-6220 00 KAIG3-RFI-SW-C-6220-00
KAIG3-RFI-SW-C-6215 00 KAIG3-RFI-SW-C-6215-00
KAIG3-RFI-SW-C-6214 00 KAIG3-RFI-SW-C-6214-00
KAIG3-RFI-SW-C-6213 00 KAIG3-RFI-SW-C-6213-00
KAIG3-RFI-SW-C-6212 00 KAIG3-RFI-SW-C-6212-00
KAIG3-RFI-SW-C-6211 00 KAIG3-RFI-SW-C-6211-00
KAIG3-RFI-SW-C-6209 00 KAIG3-RFI-SW-C-6209-00
KAIG3-RFI-SW-C-6208 00 KAIG3-RFI-SW-C-6208-00
KAIG3-RFI-SW-C-6207 00 KAIG3-RFI-SW-C-6207-00
KAIG3-RFI-SW-C-6199 00 KAIG3-RFI-SW-C-6199-00
KAIG3-RFI-SW-C-6198 00 KAIG3-RFI-SW-C-6198-00
KAIG3-RFI-SW-C-6197 00 KAIG3-RFI-SW-C-6197-00
KAIG3-RFI-SW-C-6196 00 KAIG3-RFI-SW-C-6196-00
KAIG3-RFI-SW-C-6195 00 KAIG3-RFI-SW-C-6195-00
KAIG3-RFI-SW-C-6194 00 KAIG3-RFI-SW-C-6194-00
KAIG3-RFI-SW-C-6193 00 KAIG3-RFI-SW-C-6193-00
KAIG3-RFI-EC-S-8145 00 KAIG3-RFI-EC-S-8145-00
KAIG3-RFI-EC-S-8144 00 KAIG3-RFI-EC-S-8144-00
KAIG3-RFI-WG-S-8143 00 KAIG3-RFI-WG-S-8143-00
KAIG3-RFI-EC-SU-2719 00 KAIG3-RFI-EC-SU-2719-00
KAIG3-RFI-WG-SU-2718 00 KAIG3-RFI-WG-SU-2718-00
KAIG3-RFI-GN-LS-1424 00 KAIG3-RFI-GN-LS-1424-00
KAIG3-RFI-MC-C-6218 00 KAIG3-RFI-MC-C-6218-00
KAIG3-RFI-CO-C-6217 00 KAIG3-RFI-CO-C-6217-00
KAIG3-RFI-MC-C-6216 00 KAIG3-RFI-MC-C-6216-00
KAIG3-RFI-VG-C-6226 00 KAIG3-RFI-VG-C-6226-00
KAIG3-RFI-CO-C-6219 00 KAIG3-RFI-CO-C-6219-00
KAIG3-RFI-CO-SS-0331 00 KAIG3-RFI-CO-SS-0331-00
KAIG3-RFI-CO-SS-0336 00 KAIG3-RFI-CO-SS-0336-00
KAIG3-RFI-PC-SU-2720 00 KAIG3-RFI-PC-SU-2720-00
KAIG3-RFI-CO-SU-2717 00 KAIG3-RFI-CO-SU-2717-00
KAIG3-RFI-CO-SU-2716 00 KAIG3-RFI-CO-SU-2716-00
KAIG3-RFI-CO-SU-2714 00 KAIG3-RFI-CO-SU-2714-00
KAIG3-RFI-PC-S-8148 00 KAIG3-RFI-PC-S-8148-00
KAIG3-RFI-PC-S-8147 00 KAIG3-RFI-PC-S-8147-00
KAIG3-RFI-PC-S-8146 00 KAIG3-RFI-PC-S-8146-00
KAIG3-RFI-CO-S-8141 00 KAIG3-RFI-CO-S-8141-00
KAIG3-RFI-CO-S-8140 00 KAIG3-RFI-CO-S-8140-00
KAIG3-RFI-CO-S-8138 00 KAIG3-RFI-CO-S-8138-00
KAIG3-RFI-SW-C-6192 00 KAIG3-RFI-SW-C-6192-00
KAIG3-RFI-SW-C-6191 00 KAIG3-RFI-SW-C-6191-00
KAIG3-RFI-SW-C-6190 00 KAIG3-RFI-SW-C-6190-00
KAIG3-RFI-SW-C-6188 00 KAIG3-RFI-SW-C-6188-00
KAIG3-RFI-SW-C-6187 00 KAIG3-RFI-SW-C-6187-00
KAIG3-RFI-SW-C-6180 00 KAIG3-RFI-SW-C-6180-00
KAIG3-RFI-SW-C-6179 00 KAIG3-RFI-SW-C-6179-00
KAIG3-RFI-SW-C-6178 00 KAIG3-RFI-SW-C-6178-00
KAIG3-RFI-SW-C-6177 00 KAIG3-RFI-SW-C-6177-00
KAIG3-RFI-SW-C-6142 00 KAIG3-RFI-SW-C-6142-00
KAIG3-RFI-SW-C-6005 01 KAIG3-RFI-SW-C-6005-01
KAIG3-RFI-CO-S-8137 00 KAIG3-RFI-CO-S-8137-00
KAIG3-RFI-SW-C-5887 01 KAIG3-RFI-SW-C-5887-01
KAIG3-RFI-CO-S-8136 00 KAIG3-RFI-CO-S-8136-00
KAIG3-RFI-CO-S-8134 00 KAIG3-RFI-CO-S-8134-00
KAIG3-RFI-MC-S-8130 00 KAIG3-RFI-MC-S-8130-00
KAIG3-RFI-MC-S-8129 00 KAIG3-RFI-MC-S-8129-00
KAIG3-RFI-SW-C-6176 00 KAIG3-RFI-SW-C-6176-00
KAIG3-RFI-CO-SS-0347 00 KAIG3-RFI-CO-SS-0347-00
KAIG3-RFI-SW-C-6175 00 KAIG3-RFI-SW-C-6175-00
KAIG3-RFI-SW-C-6174 00 KAIG3-RFI-SW-C-6174-00
KAIG3-RFI-SW-C-6173 00 KAIG3-RFI-SW-C-6173-00
KAIG3-RFI-SW-C-6172 00 KAIG3-RFI-SW-C-6172-00
KAIG3-RFI-SW-C-6171 00 KAIG3-RFI-SW-C-6171-00
KAIG3-RFI-SW-C-6170 00 KAIG3-RFI-SW-C-6170-00
KAIG3-RFI-CO-S-8116 00 KAIG3-RFI-CO-S-8116-00
KAIG3-RFI-CO-S-8117 00 KAIG3-RFI-CO-S-8117-00
KAIG3-RFI-CO-S-7924 00 KAIG3-RFI-CO-S-7924-00
KAIG3-RFI-SW-C-6165 00 KAIG3-RFI-SW-C-6165-00
KAIG3-RFI-LM-S-7263 01 KAIG3-RFI-LM-S-7263-01
KAIG3-RFI-SW-C-6164 00 KAIG3-RFI-SW-C-6164-00
KAIG3-RFI-SW-C-6163 00 KAIG3-RFI-SW-C-6163-00
KAIG3-RFI-SW-C-6162 00 KAIG3-RFI-SW-C-6162-00
KAIG3-RFI-SW-C-6161 00 KAIG3-RFI-SW-C-6161-00
KAIG3-RFI-SW-C-6160 00 KAIG3-RFI-SW-C-6160-00
KAIG3-RFI-SW-C-6159 00 KAIG3-RFI-SW-C-6159-00
KAIG3-RFI-SW-C-6158 00 KAIG3-RFI-SW-C-6158-00
KAIG3-RFI-SW-C-6157 00 KAIG3-RFI-SW-C-6157-00
KAIG3-RFI-SW-C-6156 00 KAIG3-RFI-SW-C-6156-00
KAIG3-RFI-VG-C-6066 00 KAIG3-RFI-VG-C-6066-00
KAIG3-RFI-SW-C-6155 00 KAIG3-RFI-SW-C-6155-00
KAIG3-RFI-SW-C-6154 00 KAIG3-RFI-SW-C-6154-00
KAIG3-RFI-PA-C-6082 00 KAIG3-RFI-PA-C-6082-00
KAIG3-RFI-PA-C-6081 00 KAIG3-RFI-PA-C-6081-00
KAIG3-RFI-PG-C-6205 00 KAIG3-RFI-PG-C-6205-00
KAIG3-RFI-PG-C-6204 00 KAIG3-RFI-PG-C-6204-00
KAIG3-RFI-WG-C-6203 00 KAIG3-RFI-WG-C-6203-00
KAIG3-RFI-PT-A-0934 00 KAIG3-RFI-PT-A-0934-00
KAIG3-RFI-SW-A-0932 00 KAIG3-RFI-SW-A-0932-00
KAIG3-RFI-WG-S-8121 00 KAIG3-RFI-WG-S-8121-00
KAIG3-RFI-TG-S-7374 02 KAIG3-RFI-TG-S-7374-02
KAIG3-RFI-EC-S-7730 01 KAIG3-RFI-EC-S-7730-01
KAIG3-RFI-EC-S-7918 01 KAIG3-RFI-EC-S-7918-01
KAIG3-RFI-WG-S-7895 01 KAIG3-RFI-WG-S-7895-01
KAIG3-RFI-TB-SU-2711 00 KAIG3-RFI-TB-SU-2711-00
KAIG3-RFI-ZG-C-6169 00 KAIG3-RFI-ZG-C-6169-00
KAIG3-RFI-TG-C-6168 00 KAIG3-RFI-TG-C-6168-00
KAIG3-RFI-PG-C-6167 00 KAIG3-RFI-PG-C-6167-00
KAIG3-RFI-PG-C-6166 00 KAIG3-RFI-PG-C-6166-00
KAIG3-RFI-WG-C-6147 00 KAIG3-RFI-WG-C-6147-00
KAIG3-RFI-ZG-A-0933 00 KAIG3-RFI-ZG-A-0933-00
KAIG3-RFI-PT-A-0931 00 KAIG3-RFI-PT-A-0931-00
KAIG3-RFI-CF-S-7696 00 KAIG3-RFI-CF-S-7696-00
KAIG3-RFI-CO-S-7679 01 KAIG3-RFI-CO-S-7679-01
KAIG3-RFI-SW-LS-1423 00 KAIG3-RFI-SW-LS-1423-00
KAIG3-RFI-CO-C-6183 00 KAIG3-RFI-CO-C-6183-00
KAIG3-RFI-CO-C-6182 00 KAIG3-RFI-CO-C-6182-00
KAIG3-RFI-MC-C-6181 00 KAIG3-RFI-MC-C-6181-00
KAIG3-RFI-CO-S-8115 00 KAIG3-RFI-CO-S-8115-00
KAIG3-RFI-CO-S-8114 00 KAIG3-RFI-CO-S-8114-00
KAIG3-RFI-CO-SU-2710 00 KAIG3-RFI-CO-SU-2710-00
KAIG3-RFI-CO-SU-2709 00 KAIG3-RFI-CO-SU-2709-00
KAIG3-RFI-ST-S-8112 00 KAIG3-RFI-ST-S-8112-00
KAIG3-RFI-ST-S-8113 00 KAIG3-RFI-ST-S-8113-00
KAIG3-RFI-MC-S-8092 00 KAIG3-RFI-MC-S-8092-00
KAIG3-RFI-MC-S-8093 00 KAIG3-RFI-MC-S-8093-00
KAIG3-RFI-MC-SU-2704 00 KAIG3-RFI-MC-SU-2704-00
KAIG3-RFI-ST-SU-2708 00 KAIG3-RFI-ST-SU-2708-00
KAIG3-RFI-CO-SU-2707 00 KAIG3-RFI-CO-SU-2707-00
KAIG3-RFI-BO-LC-0691 00 KAIG3-RFI-BO-LC-0691-00
KAIG3-RFI-TT-LC-0693 00 KAIG3-RFI-TT-LC-0693-00
KAIG3-RFI-SW-LC-0690 00 KAIG3-RFI-SW-LC-0690-00
KAIG3-RFI-SW-LC-0689 00 KAIG3-RFI-SW-LC-0689-00
KAIG3-RFI-CO-SS-0321 00 KAIG3-RFI-CO-SS-0321-00
KAIG3-RFI-MB-A-0930 00 KAIG3-RFI-MB-A-0930-00
KAIG3-RFI-SW-A-0929 00 KAIG3-RFI-SW-A-0929-00
KAIG3-RFI-MB-S-8109 00 KAIG3-RFI-MB-S-8109-00
KAIG3-RFI-CO-SS-0320 00 KAIG3-RFI-CO-SS-0320-00
KAIG3-RFI-MB-S-8108 00 KAIG3-RFI-MB-S-8108-00
KAIG3-RFI-PC-LC-0694 00 KAIG3-RFI-PC-LC-0694-00
KAIG3-RFI-CO-SS-0333 00 KAIG3-RFI-CO-SS-0333-00
KAIG3-RFI-TB-S-8088 00 KAIG3-RFI-TB-S-8088-00
KAIG3-RFI-EC-S-8087 00 KAIG3-RFI-EC-S-8087-00
KAIG3-RFI-CO-SS-0334 00 KAIG3-RFI-CO-SS-0334-00
KAIG3-RFI-EC-S-8086 00 KAIG3-RFI-EC-S-8086-00
KAIG3-RFI-CO-SS-0332 00 KAIG3-RFI-CO-SS-0332-00
KAIG3-RFI-TG-S-8084 00 KAIG3-RFI-TG-S-8084-00
KAIG3-RFI-CO-SS-0329 00 KAIG3-RFI-CO-SS-0329-00
KAIG3-RFI-CO-SS-0324 00 KAIG3-RFI-CO-SS-0324-00
KAIG3-RFI-PG-S-8083 00 KAIG3-RFI-PG-S-8083-00
KAIG3-RFI-WG-S-8068 00 KAIG3-RFI-WG-S-8068-00
KAIG3-RFI-TG-S-8082 00 KAIG3-RFI-TG-S-8082-00
KAIG3-RFI-TG-SU-2702 00 KAIG3-RFI-TG-SU-2702-00
KAIG3-RFI-CO-SS-0339 00 KAIG3-RFI-CO-SS-0339-00
KAIG3-RFI-ZG-C-6146 00 KAIG3-RFI-ZG-C-6146-00
KAIG3-RFI-CO-SS-0337 00 KAIG3-RFI-CO-SS-0337-00
KAIG3-RFI-WG-C-6136 00 KAIG3-RFI-WG-C-6136-00
KAIG3-RFI-WG-C-6135 00 KAIG3-RFI-WG-C-6135-00
KAIG3-RFI-WG-C-6134 00 KAIG3-RFI-WG-C-6134-00
KAIG3-RFI-CO-SS-0335 00 KAIG3-RFI-CO-SS-0335-00
KAIG3-RFI-ZG-C-6133 00 KAIG3-RFI-ZG-C-6133-00
KAIG3-RFI-TG-C-6132 00 KAIG3-RFI-TG-C-6132-00
KAIG3-RFI-SG-C-6131 00 KAIG3-RFI-SG-C-6131-00
KAIG3-RFI-SG-C-6130 00 KAIG3-RFI-SG-C-6130-00
KAIG3-RFI-CO-SU-2703 00 KAIG3-RFI-CO-SU-2703-00
KAIG3-RFI-CO-SU-2705 00 KAIG3-RFI-CO-SU-2705-00
KAIG3-RFI-CO-S-8095 00 KAIG3-RFI-CO-S-8095-00
KAIG3-RFI-CO-SU-2706 00 KAIG3-RFI-CO-SU-2706-00
KAIG3-RFI-CO-S-8107 00 KAIG3-RFI-CO-S-8107-00
KAIG3-RFI-CO-S-8106 00 KAIG3-RFI-CO-S-8106-00
KAIG3-RFI-CO-S-8102 00 KAIG3-RFI-CO-S-8102-00
KAIG3-RFI-CO-S-8104 00 KAIG3-RFI-CO-S-8104-00
KAIG3-RFI-CO-S-8103 00 KAIG3-RFI-CO-S-8103-00
KAIG3-RFI-CO-S-8101 00 KAIG3-RFI-CO-S-8101-00
KAIG3-RFI-CO-S-8100 00 KAIG3-RFI-CO-S-8100-00
KAIG3-RFI-CO-S-8099 00 KAIG3-RFI-CO-S-8099-00
KAIG3-RFI-MC-S-8105 00 KAIG3-RFI-MC-S-8105-00
KAIG3-RFI-CO-S-8098 00 KAIG3-RFI-CO-S-8098-00
KAIG3-RFI-CO-S-7653 01 KAIG3-RFI-CO-S-7653-01
KAIG3-RFI-CO-S-7652 01 KAIG3-RFI-CO-S-7652-01
KAIG3-RFI-SW-C-6152 00 KAIG3-RFI-SW-C-6152-00
KAIG3-RFI-SW-C-6151 00 KAIG3-RFI-SW-C-6151-00
KAIG3-RFI-CO-S-8089 00 KAIG3-RFI-CO-S-8089-00
KAIG3-RFI-CO-S-8096 00 KAIG3-RFI-CO-S-8096-00
KAIG3-RFI-SW-LS-1422 00 KAIG3-RFI-SW-LS-1422-00
KAIG3-RFI-SW-C-6153 00 KAIG3-RFI-SW-C-6153-00
KAIG3-RFI-SW-C-6150 00 KAIG3-RFI-SW-C-6150-00
KAIG3-RFI-SW-C-6149 00 KAIG3-RFI-SW-C-6149-00
KAIG3-RFI-SW-C-6148 00 KAIG3-RFI-SW-C-6148-00
KAIG3-RFI-SW-C-6145 00 KAIG3-RFI-SW-C-6145-00
KAIG3-RFI-SW-C-6144 00 KAIG3-RFI-SW-C-6144-00
KAIG3-RFI-SW-C-6143 00 KAIG3-RFI-SW-C-6143-00
KAIG3-RFI-SW-C-6141 00 KAIG3-RFI-SW-C-6141-00
KAIG3-RFI-SW-C-6140 00 KAIG3-RFI-SW-C-6140-00
KAIG3-RFI-SW-C-6139 00 KAIG3-RFI-SW-C-6139-00
KAIG3-RFI-SW-C-6138 00 KAIG3-RFI-SW-C-6138-00
KAIG3-RFI-SW-C-6137 00 KAIG3-RFI-SW-C-6137-00
KAIG3-RFI-SW-C-6129 00 KAIG3-RFI-SW-C-6129-00
KAIG3-RFI-SW-C-6128 00 KAIG3-RFI-SW-C-6128-00
KAIG3-RFI-SW-C-6125 00 KAIG3-RFI-SW-C-6125-00
KAIG3-RFI-SW-C-6124 00 KAIG3-RFI-SW-C-6124-00
KAIG3-RFI-SW-C-6123 00 KAIG3-RFI-SW-C-6123-00
KAIG3-RFI-SW-C-6122 00 KAIG3-RFI-SW-C-6122-00
KAIG3-RFI-SW-C-6121 00 KAIG3-RFI-SW-C-6121-00
KAIG3-RFI-SW-C-6114 00 KAIG3-RFI-SW-C-6114-00
KAIG3-RFI-SW-C-6113 00 KAIG3-RFI-SW-C-6113-00
KAIG3-RFI-SW-C-6112 00 KAIG3-RFI-SW-C-6112-00
KAIG3-RFI-SW-C-6111 00 KAIG3-RFI-SW-C-6111-00
KAIG3-RFI-SW-C-6110 00 KAIG3-RFI-SW-C-6110-00
KAIG3-RFI-SW-C-6109 00 KAIG3-RFI-SW-C-6109-00
KAIG3-RFI-SW-C-6108 00 KAIG3-RFI-SW-C-6108-00
KAIG3-RFI-SW-C-6107 00 KAIG3-RFI-SW-C-6107-00
KAIG3-RFI-SW-C-6101 00 KAIG3-RFI-SW-C-6101-00
KAIG3-RFI-SW-C-6096 00 KAIG3-RFI-SW-C-6096-00
KAIG3-RFI-SW-C-6095 00 KAIG3-RFI-SW-C-6095-00
KAIG3-RFI-SW-C-6094 00 KAIG3-RFI-SW-C-6094-00
KAIG3-RFI-SW-C-6093 00 KAIG3-RFI-SW-C-6093-00
KAIG3-RFI-SW-C-6091 00 KAIG3-RFI-SW-C-6091-00
KAIG3-RFI-SW-C-6092 00 KAIG3-RFI-SW-C-6092-00
KAIG3-RFI-SW-C-6090 00 KAIG3-RFI-SW-C-6090-00
KAIG3-RFI-SW-C-6089 00 KAIG3-RFI-SW-C-6089-00
KAIG3-RFI-SW-C-6079 00 KAIG3-RFI-SW-C-6079-00
KAIG3-RFI-SW-C-6055 00 KAIG3-RFI-SW-C-6055-00
KAIG3-RFI-SW-C-6010 00 KAIG3-RFI-SW-C-6010-00
KAIG3-RFI-SW-C-6080 00 KAIG3-RFI-SW-C-6080-00
KAIG3-RFI-SW-C-6078 00 KAIG3-RFI-SW-C-6078-00
KAIG3-RFI-SW-C-6077 00 KAIG3-RFI-SW-C-6077-00
KAIG3-RFI-SW-C-6076 00 KAIG3-RFI-SW-C-6076-00
KAIG3-RFI-SW-C-6075 00 KAIG3-RFI-SW-C-6075-00
KAIG3-RFI-SW-C-6074 00 KAIG3-RFI-SW-C-6074-00
KAIG3-RFI-SW-C-6073 00 KAIG3-RFI-SW-C-6073-00
KAIG3-RFI-SW-C-6072 00 KAIG3-RFI-SW-C-6072-00
KAIG3-RFI-SW-C-6071 00 KAIG3-RFI-SW-C-6071-00
KAIG3-RFI-SW-C-6070 00 KAIG3-RFI-SW-C-6070-00
KAIG3-RFI-SW-C-6069 00 KAIG3-RFI-SW-C-6069-00
KAIG3-RFI-SW-C-6057 00 KAIG3-RFI-SW-C-6057-00
KAIG3-RFI-SW-C-6054 00 KAIG3-RFI-SW-C-6054-00
KAIG3-RFI-SW-C-6053 00 KAIG3-RFI-SW-C-6053-00
KAIG3-RFI-SW-C-6052 00 KAIG3-RFI-SW-C-6052-00
KAIG3-RFI-SW-C-6051 00 KAIG3-RFI-SW-C-6051-00
KAIG3-RFI-SW-C-6050 00 KAIG3-RFI-SW-C-6050-00
KAIG3-RFI-SW-C-6127 00 KAIG3-RFI-SW-C-6127-00
KAIG3-RFI-SW-C-6049 00 KAIG3-RFI-SW-C-6049-00
KAIG3-RFI-SW-C-6048 00 KAIG3-RFI-SW-C-6048-00
KAIG3-RFI-SW-C-6047 00 KAIG3-RFI-SW-C-6047-00
KAIG3-RFI-SW-C-6046 00 KAIG3-RFI-SW-C-6046-00
KAIG3-RFI-SW-C-6045 00 KAIG3-RFI-SW-C-6045-00
KAIG3-RFI-SW-C-6044 00 KAIG3-RFI-SW-C-6044-00
KAIG3-RFI-SW-C-6126 00 KAIG3-RFI-SW-C-6126-00
KAIG3-RFI-SW-C-6043 00 KAIG3-RFI-SW-C-6043-00
KAIG3-RFI-SW-C-6042 00 KAIG3-RFI-SW-C-6042-00
KAIG3-RFI-SW-C-6041 00 KAIG3-RFI-SW-C-6041-00
KAIG3-RFI-SW-C-6040 00 KAIG3-RFI-SW-C-6040-00
KAIG3-RFI-CO-C-6119 00 KAIG3-RFI-CO-C-6119-00
KAIG3-RFI-MC-C-6118 00 KAIG3-RFI-MC-C-6118-00
KAIG3-RFI-SW-C-5990 00 KAIG3-RFI-SW-C-5990-00
KAIG3-RFI-MC-C-6116 00 KAIG3-RFI-MC-C-6116-00
KAIG3-RFI-SW-C-6033 00 KAIG3-RFI-SW-C-6033-00
KAIG3-RFI-SW-C-6032 00 KAIG3-RFI-SW-C-6032-00
KAIG3-RFI-SW-C-6009 00 KAIG3-RFI-SW-C-6009-00
KAIG3-RFI-CO-C-6117 00 KAIG3-RFI-CO-C-6117-00
KAIG3-RFI-CO-C-6120 00 KAIG3-RFI-CO-C-6120-00
KAIG3-RFI-CO-S-7853 01 KAIG3-RFI-CO-S-7853-01
KAIG3-RFI-CO-SU-2700 00 KAIG3-RFI-CO-SU-2700-00
KAIG3-RFI-CO-S-8078 00 KAIG3-RFI-CO-S-8078-00
KAIG3-RFI-CO-S-8076 00 KAIG3-RFI-CO-S-8076-00
KAIG3-RFI-CO-S-8075 00 KAIG3-RFI-CO-S-8075-00
KAIG3-RFI-CO-S-8074 00 KAIG3-RFI-CO-S-8074-00
KAIG3-RFI-CO-SS-0326 00 KAIG3-RFI-CO-SS-0326-00
KAIG3-RFI-CO-SS-0328 00 KAIG3-RFI-CO-SS-0328-00
KAIG3-RFI-CO-C-6106 00 KAIG3-RFI-CO-C-6106-00
KAIG3-RFI-CO-C-6098 00 KAIG3-RFI-CO-C-6098-00
KAIG3-RFI-MC-C-6097 00 KAIG3-RFI-MC-C-6097-00
KAIG3-RFI-ZG-A-0928 00 KAIG3-RFI-ZG-A-0928-00
KAIG3-RFI-AG-S-8073 00 KAIG3-RFI-AG-S-8073-00
KAIG3-RFI-ZG-S-8072 00 KAIG3-RFI-ZG-S-8072-00
KAIG3-RFI-TG-S-8071 00 KAIG3-RFI-TG-S-8071-00
KAIG3-RFI-EC-S-8070 00 KAIG3-RFI-EC-S-8070-00
KAIG3-RFI-MB-LC-0682 00 KAIG3-RFI-MB-LC-0682-00
KAIG3-RFI-EC-S-8069 00 KAIG3-RFI-EC-S-8069-00
KAIG3-RFI-MB-LC-0681 00 KAIG3-RFI-MB-LC-0681-00
KAIG3-RFI-TG-SU-2699 00 KAIG3-RFI-TG-SU-2699-00
KAIG3-RFI-EC-SU-2698 00 KAIG3-RFI-EC-SU-2698-00
KAIG3-RFI-EC-SU-2697 00 KAIG3-RFI-EC-SU-2697-00
KAIG3-RFI-PG-C-6100 00 KAIG3-RFI-PG-C-6100-00
KAIG3-RFI-SW-A-0925 00 KAIG3-RFI-SW-A-0925-00
KAIG3-RFI-EC-S-8049 00 KAIG3-RFI-EC-S-8049-00
KAIG3-RFI-TG-C-6102-00 00 KAIG3-RFI-TG-C-6102-00-00
KAIG3-RFI-TG-C-6103 00 KAIG3-RFI-TG-C-6103-00
KAIG3-RFI-SW-A-0927 00 KAIG3-RFI-SW-A-0927-00
KAIG3-RFI-CO-SU-2597 00 KAIG3-RFI-CO-SU-2597-00
KAIG3-RFI-TB-LC-0688 00 KAIG3-RFI-TB-LC-0688-00
KAIG3-RFI-TB-LC-0687 00 KAIG3-RFI-TB-LC-0687-00
KAIG3-RFI-TB-LC-0686 00 KAIG3-RFI-TB-LC-0686-00
KAIG3-RFI-TB-LC-0685 00 KAIG3-RFI-TB-LC-0685-00
KAIG3-RFI-ZG-A-0926 00 KAIG3-RFI-ZG-A-0926-00
KAIG3-RFI-AG-S-8059 00 KAIG3-RFI-AG-S-8059-00
KAIG3-RFI-PG-C-6099 00 KAIG3-RFI-PG-C-6099-00
KAIG3-RFI-WG-SU-2692 00 KAIG3-RFI-WG-SU-2692-00
KAIG3-RFI-WG-C-6104 00 KAIG3-RFI-WG-C-6104-00
KAIG3-RFI-WG-C-6105 00 KAIG3-RFI-WG-C-6105-00
KAIG3-RFI-CO-SU-2696 00 KAIG3-RFI-CO-SU-2696-00
KAIG3-RFI-CO-SU-2695 00 KAIG3-RFI-CO-SU-2695-00
KAIG3-RFI-PC-SU-2694 00 KAIG3-RFI-PC-SU-2694-00
KAIG3-RFI-CO-SU-2691 00 KAIG3-RFI-CO-SU-2691-00
KAIG3-RFI-LM-SU-2690 00 KAIG3-RFI-LM-SU-2690-00
KAIG3-RFI-MC-S-8066 00 KAIG3-RFI-MC-S-8066-00
KAIG3-RFI-CO-S-8067 00 KAIG3-RFI-CO-S-8067-00
KAIG3-RFI-CO-S-8063 00 KAIG3-RFI-CO-S-8063-00
KAIG3-RFI-MC-S-8058 00 KAIG3-RFI-MC-S-8058-00
KAIG3-RFI-CO-S-8064 00 KAIG3-RFI-CO-S-8064-00
KAIG3-RFI-CO-S-8061 00 KAIG3-RFI-CO-S-8061-00
KAIG3-RFI-CO-S-7545 00 KAIG3-RFI-CO-S-7545-00
KAIG3-RFI-PC-S-8056 00 KAIG3-RFI-PC-S-8056-00
KAIG3-RFI-PC-S-8055 00 KAIG3-RFI-PC-S-8055-00
KAIG3-RFI-CO-S-7972 00 KAIG3-RFI-CO-S-7972-00
KAIG3-RFI-CO-S-7971 00 KAIG3-RFI-CO-S-7971-00
KAIG3-RFI-PC-S-8026 00 KAIG3-RFI-PC-S-8026-00
KAIG3-RFI-CO-S-8060 00 KAIG3-RFI-CO-S-8060-00
KAIG3-RFI-CO-S-8047 00 KAIG3-RFI-CO-S-8047-00
KAIG3-RFI-CO-S-8046 00 KAIG3-RFI-CO-S-8046-00
KAIG3-RFI-CO-S-8045 00 KAIG3-RFI-CO-S-8045-00
KAIG3-RFI-LM-S-8044 00 KAIG3-RFI-LM-S-8044-00
KAIG3-RFI-LM-S-8043 00 KAIG3-RFI-LM-S-8043-00
KAIG3-RFI-CO-SS-0316 00 KAIG3-RFI-CO-SS-0316-00
KAIG3-RFI-CO-SS-0317 00 KAIG3-RFI-CO-SS-0317-00
KAIG3-RFI-CO-SS-0319 00 KAIG3-RFI-CO-SS-0319-00
KAIG3-RFI-CO-SS-0318 00 KAIG3-RFI-CO-SS-0318-00
KAIG3-RFI-MC-C-6067 00 KAIG3-RFI-MC-C-6067-00
KAIG3-RFI-CO-SU-2688 00 KAIG3-RFI-CO-SU-2688-00
KAIG3-RFI-CO-SU-2693 00 KAIG3-RFI-CO-SU-2693-00
KAIG3-RFI-SM-SU-2679 00 KAIG3-RFI-SM-SU-2679-00
KAIG3-RFI-CO-SU-2689 00 KAIG3-RFI-CO-SU-2689-00
KAIG3-RFI-SM-S-8016 00 KAIG3-RFI-SM-S-8016-00
KAIG3-RFI-PC-S-8025 00 KAIG3-RFI-PC-S-8025-00
KAIG3-RFI-CO-S-8039 00 KAIG3-RFI-CO-S-8039-00
KAIG3-RFI-CO-S-8053 00 KAIG3-RFI-CO-S-8053-00
KAIG3-RFI-CO-S-8042 00 KAIG3-RFI-CO-S-8042-00
KAIG3-RFI-CO-S-8041 00 KAIG3-RFI-CO-S-8041-00
KAIG3-RFI-WG-C-6084 00 KAIG3-RFI-WG-C-6084-00
KAIG3-RFI-WG-LS-1421-00 00 KAIG3-RFI-WG-LS-1421-00-00
KAIG3-RFI-AG-S-8038 00 KAIG3-RFI-AG-S-8038-00
KAIG3-RFI-WG-C-6068 00 KAIG3-RFI-WG-C-6068-00
KAIG3-RFI-WG-S-8050 00 KAIG3-RFI-WG-S-8050-00
KAIG3-RFI-WG-C-6083 00 KAIG3-RFI-WG-C-6083-00
KAIG3-RFI-WG-C-6086 00 KAIG3-RFI-WG-C-6086-00
KAIG3-RFI-WG-C-6087 00 KAIG3-RFI-WG-C-6087-00
KAIG3-RFI-EC-S-8052 00 KAIG3-RFI-EC-S-8052-00
KAIG3-RFI-EC-S-8051 00 KAIG3-RFI-EC-S-8051-00
KAIG3-RFI-TB-E-0503 00 KAIG3-RFI-TB-E-0503-00
KAIG3-RFI-WG-P-0253 00 KAIG3-RFI-WG-P-0253-00
KAIG3-RFI-MB-P-0252 00 KAIG3-RFI-MB-P-0252-00
KAIG3-RFI-SW-LS-1420 00 KAIG3-RFI-SW-LS-1420-00
KAIG3-RFI-SW-LS-1419 00 KAIG3-RFI-SW-LS-1419-00
KAIG3-RFI-SW-LS-1418 00 KAIG3-RFI-SW-LS-1418-00
KAIG3-RFI-SW-C-6060 00 KAIG3-RFI-SW-C-6060-00
KAIG3-RFI-SW-C-6059 00 KAIG3-RFI-SW-C-6059-00
KAIG3-RFI-SW-C-6062 00 KAIG3-RFI-SW-C-6062-00
KAIG3-RFI-SW-C-6061 00 KAIG3-RFI-SW-C-6061-00
KAIG3-RFI-CO-S-7707 00 KAIG3-RFI-CO-S-7707-00
KAIG3-RFI-CC-SU-2685 00 KAIG3-RFI-CC-SU-2685-00
KAIG3-RFI-CO-SU-2684 00 KAIG3-RFI-CO-SU-2684-00
KAIG3-RFI-MC-SU-2687 00 KAIG3-RFI-MC-SU-2687-00
KAIG3-RFI-CO-SU-2613 01 KAIG3-RFI-CO-SU-2613-01
KAIG3-RFI-MC-C-5986 00 KAIG3-RFI-MC-C-5986-00
KAIG3-RFI-MC-C-6063 00 KAIG3-RFI-MC-C-6063-00
KAIG3-RFI-CO-C-6064 00 KAIG3-RFI-CO-C-6064-00
KAIG3-RFI-CO-C-6065 00 KAIG3-RFI-CO-C-6065-00
KAIG3-RFI-MC-S-8037 00 KAIG3-RFI-MC-S-8037-00
KAIG3-RFI-MC-S-8036 00 KAIG3-RFI-MC-S-8036-00
KAIG3-RFI-CC-S-8032 00 KAIG3-RFI-CC-S-8032-00
KAIG3-RFI-CO-S-8028 00 KAIG3-RFI-CO-S-8028-00
KAIG3-RFI-CO-S-8031 00 KAIG3-RFI-CO-S-8031-00
KAIG3-RFI-EC-SU-2686 00 KAIG3-RFI-EC-SU-2686-00
KAIG3-RFI-WG-C-6038 00 KAIG3-RFI-WG-C-6038-00
KAIG3-RFI-PG-C-6039-00 00 KAIG3-RFI-PG-C-6039-00-00
KAIG3-RFI-AG-S-8034 00 KAIG3-RFI-AG-S-8034-00
KAIG3-RFI-CO-S-8029 00 KAIG3-RFI-CO-S-8029-00
KAIG3-RFI-ZG-C-6035-00 00 KAIG3-RFI-ZG-C-6035-00-00
KAIG3-RFI-PG-A-0921 00 KAIG3-RFI-PG-A-0921-00
KAIG3-RFI-PG-A-0922 00 KAIG3-RFI-PG-A-0922-00
KAIG3-RFI-SG-LC-0677 00 KAIG3-RFI-SG-LC-0677-00
KAIG3-RFI-WG-S-8013 00 KAIG3-RFI-WG-S-8013-00
KAIG3-RFI-WG-LS-1412 00 KAIG3-RFI-WG-LS-1412-00
KAIG3-RFI-WG-SU-2678 00 KAIG3-RFI-WG-SU-2678-00
KAIG3-RFI-MB-A-0919 00 KAIG3-RFI-MB-A-0919-00
KAIG3-RFI-MB-A-0920-00 00 KAIG3-RFI-MB-A-0920-00-00
KAIG3-RFI-DG-C-6034 00 KAIG3-RFI-DG-C-6034-00
KAIG3-RFI-WG-C-6021 00 KAIG3-RFI-WG-C-6021-00
KAIG3-RFI-CO-SU-2682 00 KAIG3-RFI-CO-SU-2682-00
KAIG3-RFI-CO-C-6037 00 KAIG3-RFI-CO-C-6037-00
KAIG3-RFI-CO-S-8024 00 KAIG3-RFI-CO-S-8024-00
KAIG3-RFI-CO-S-8023 00 KAIG3-RFI-CO-S-8023-00
KAIG3-RFI-CO-SU-2681 00 KAIG3-RFI-CO-SU-2681-00
KAIG3-RFI-CO-S-8021 00 KAIG3-RFI-CO-S-8021-00
KAIG3-RFI-SM-SU-2680 00 KAIG3-RFI-SM-SU-2680-00
KAIG3-RFI-SM-S-8020 00 KAIG3-RFI-SM-S-8020-00
KAIG3-RFI-SM-S-8019 00 KAIG3-RFI-SM-S-8019-00
KAIG3-RFI-SM-S-8018 00 KAIG3-RFI-SM-S-8018-00
KAIG3-RFI-CO-S-8014 00 KAIG3-RFI-CO-S-8014-00
KAIG3-RFI-SM-S-8015 00 KAIG3-RFI-SM-S-8015-00
KAIG3-RFI-LM-S-8012 00 KAIG3-RFI-LM-S-8012-00
KAIG3-RFI-CO-SU-2677 00 KAIG3-RFI-CO-SU-2677-00
KAIG3-RFI-CO-S-8009 00 KAIG3-RFI-CO-S-8009-00
KAIG3-RFI-CO-S-8008 00 KAIG3-RFI-CO-S-8008-00
KAIG3-RFI-MB-A-0917 00 KAIG3-RFI-MB-A-0917-00
KAIG3-RFI-CO-S-7999 00 KAIG3-RFI-CO-S-7999-00
KAIG3-RFI-CO-S-7998 00 KAIG3-RFI-CO-S-7998-00
KAIG3-RFI-CO-S-7997 00 KAIG3-RFI-CO-S-7997-00
KAIG3-RFI-CO-S-8035 00 KAIG3-RFI-CO-S-8035-00
KAIG3-RFI-WG-C-5993 00 KAIG3-RFI-WG-C-5993-00
KAIG3-RFI-WG-C-6025 00 KAIG3-RFI-WG-C-6025-00
KAIG3-RFI-WG-C-6022-00 00 KAIG3-RFI-WG-C-6022-00-00
KAIG3-RFI-MB-A-0918 00 KAIG3-RFI-MB-A-0918-00
KAIG3-RFI-SM-E-0502 00 KAIG3-RFI-SM-E-0502-00
KAIG3-RFI-SM-E-0501 00 KAIG3-RFI-SM-E-0501-00
KAIG3-RFI-MB-C-6036 00 KAIG3-RFI-MB-C-6036-00
KAIG3-RFI-SM-LC-0680 00 KAIG3-RFI-SM-LC-0680-00
KAIG3-RFI-TG-SS-0312 00 KAIG3-RFI-TG-SS-0312-00
KAIG3-RFI-AG-SS-0311 00 KAIG3-RFI-AG-SS-0311-00
KAIG3-RFI-AG-SS-0310 00 KAIG3-RFI-AG-SS-0310-00
KAIG3-RFI-SW-C-6024 00 KAIG3-RFI-SW-C-6024-00
KAIG3-RFI-SW-C-6023 00 KAIG3-RFI-SW-C-6023-00
KAIG3-RFI-TG-E-0500 00 KAIG3-RFI-TG-E-0500-00
KAIG3-RFI-AG-S-8010 00 KAIG3-RFI-AG-S-8010-00
KAIG3-RFI-SG-LC-0676 00 KAIG3-RFI-SG-LC-0676-00
KAIG3-RFI-SG-LC-0663 01 KAIG3-RFI-SG-LC-0663-01
KAIG3-RFI-SG-LC-0662 01 KAIG3-RFI-SG-LC-0662-01
KAIG3-RFI-ZG-LC-0672 01 KAIG3-RFI-ZG-LC-0672-01
KAIG3-RFI-SW-C-6031 00 KAIG3-RFI-SW-C-6031-00
KAIG3-RFI-SW-C-6030 00 KAIG3-RFI-SW-C-6030-00
KAIG3-RFI-SW-C-6029 00 KAIG3-RFI-SW-C-6029-00
KAIG3-RFI-SW-C-6028 00 KAIG3-RFI-SW-C-6028-00
KAIG3-RFI-SW-C-6027 00 KAIG3-RFI-SW-C-6027-00
KAIG3-RFI-SW-C-6026 00 KAIG3-RFI-SW-C-6026-00
KAIG3-RFI-SW-C-6020 00 KAIG3-RFI-SW-C-6020-00
KAIG3-RFI-SW-C-6019 00 KAIG3-RFI-SW-C-6019-00
KAIG3-RFI-SW-C-6016 00 KAIG3-RFI-SW-C-6016-00
KAIG3-RFI-SW-C-6015 00 KAIG3-RFI-SW-C-6015-00
KAIG3-RFI-SW-C-6014 00 KAIG3-RFI-SW-C-6014-00
KAIG3-RFI-SW-C-6013 00 KAIG3-RFI-SW-C-6013-00
KAIG3-RFI-SW-C-6012 00 KAIG3-RFI-SW-C-6012-00
KAIG3-RFI-SW-C-6011 00 KAIG3-RFI-SW-C-6011-00
KAIG3-RFI-SW-C-6008 00 KAIG3-RFI-SW-C-6008-00
KAIG3-RFI-SW-C-6007 00 KAIG3-RFI-SW-C-6007-00
KAIG3-RFI-SW-C-6006 00 KAIG3-RFI-SW-C-6006-00
KAIG3-RFI-SW-C-5957 00 KAIG3-RFI-SW-C-5957-00
KAIG3-RFI-ZG-S-8007 00 KAIG3-RFI-ZG-S-8007-00
KAIG3-RFI-PG-S-8001 00 KAIG3-RFI-PG-S-8001-00
KAIG3-RFI-PG-S-8002 00 KAIG3-RFI-PG-S-8002-00
KAIG3-RFI-SW-A-0916 00 KAIG3-RFI-SW-A-0916-00
KAIG3-RFI-CO-SS-0314 00 KAIG3-RFI-CO-SS-0314-00
KAIG3-RFI-WG-C-5994 00 KAIG3-RFI-WG-C-5994-00
KAIG3-RFI-ZG-LS-1417 00 KAIG3-RFI-ZG-LS-1417-00
KAIG3-RFI-AG-S-8004 00 KAIG3-RFI-AG-S-8004-00
KAIG3-RFI-CO-SS-0315 00 KAIG3-RFI-CO-SS-0315-00
KAIG3-RFI-CO-C-5988 00 KAIG3-RFI-CO-C-5988-00
KAIG3-RFI-CO-C-5987 00 KAIG3-RFI-CO-C-5987-00
KAIG3-RFI-ZG-S-8003 00 KAIG3-RFI-ZG-S-8003-00
KAIG3-RFI-MC-SU-2675 00 KAIG3-RFI-MC-SU-2675-00
KAIG3-RFI-MC-SU-2674 00 KAIG3-RFI-MC-SU-2674-00
KAIG3-RFI-CO-SU-2673 00 KAIG3-RFI-CO-SU-2673-00
KAIG3-RFI-EC-S-7986 00 KAIG3-RFI-EC-S-7986-00
KAIG3-RFI-CO-SU-2676 00 KAIG3-RFI-CO-SU-2676-00
KAIG3-RFI-CO-S-8006 00 KAIG3-RFI-CO-S-8006-00
KAIG3-RFI-TG-C-5972 00 KAIG3-RFI-TG-C-5972-00
KAIG3-RFI-CO-S-8005 00 KAIG3-RFI-CO-S-8005-00
KAIG3-RFI-CO-S-8000 00 KAIG3-RFI-CO-S-8000-00
KAIG3-RFI-MC-S-7996 00 KAIG3-RFI-MC-S-7996-00
KAIG3-RFI-MC-S-7995 00 KAIG3-RFI-MC-S-7995-00
KAIG3-RFI-MC-S-7994 00 KAIG3-RFI-MC-S-7994-00
KAIG3-RFI-MC-S-7993 00 KAIG3-RFI-MC-S-7993-00
KAIG3-RFI-CO-S-7989 00 KAIG3-RFI-CO-S-7989-00
KAIG3-RFI-CO-S-7990 00 KAIG3-RFI-CO-S-7990-00
KAIG3-RFI-CO-S-7991 00 KAIG3-RFI-CO-S-7991-00
KAIG3-RFI-CO-S-7992 00 KAIG3-RFI-CO-S-7992-00
KAIG3-RFI-PC-S-7987 00 KAIG3-RFI-PC-S-7987-00
KAIG3-RFI-CO-SU-2672 00 KAIG3-RFI-CO-SU-2672-00
KAIG3-RFI-CO-S-7984 00 KAIG3-RFI-CO-S-7984-00
KAIG3-RFI-CO-S-7985 00 KAIG3-RFI-CO-S-7985-00
KAIG3-RFI-SW-C-5923 00 KAIG3-RFI-SW-C-5923-00
KAIG3-RFI-SW-C-5912 00 KAIG3-RFI-SW-C-5912-00
KAIG3-RFI-SW-C-5911 00 KAIG3-RFI-SW-C-5911-00
KAIG3-RFI-SW-C-5910 00 KAIG3-RFI-SW-C-5910-00
KAIG3-RFI-SW-C-5909 00 KAIG3-RFI-SW-C-5909-00
KAIG3-RFI-SW-C-6005 00 KAIG3-RFI-SW-C-6005-00
KAIG3-RFI-SW-C-6004 00 KAIG3-RFI-SW-C-6004-00
KAIG3-RFI-SW-C-6003 00 KAIG3-RFI-SW-C-6003-00
KAIG3-RFI-SW-C-6002 00 KAIG3-RFI-SW-C-6002-00
KAIG3-RFI-SW-C-6001 00 KAIG3-RFI-SW-C-6001-00
KAIG3-RFI-SW-C-6000 00 KAIG3-RFI-SW-C-6000-00
KAIG3-RFI-SW-C-5998 00 KAIG3-RFI-SW-C-5998-00
KAIG3-RFI-SW-C-5997 00 KAIG3-RFI-SW-C-5997-00
KAIG3-RFI-SW-C-5996 00 KAIG3-RFI-SW-C-5996-00
KAIG3-RFI-SW-C-5995 00 KAIG3-RFI-SW-C-5995-00
KAIG3-RFI-SW-C-5991 00 KAIG3-RFI-SW-C-5991-00
KAIG3-RFI-SW-C-5989 00 KAIG3-RFI-SW-C-5989-00
KAIG3-RFI-SW-C-5985 00 KAIG3-RFI-SW-C-5985-00
KAIG3-RFI-SW-C-5983 00 KAIG3-RFI-SW-C-5983-00
KAIG3-RFI-SW-C-5982 00 KAIG3-RFI-SW-C-5982-00
KAIG3-RFI-SW-C-5981 00 KAIG3-RFI-SW-C-5981-00
KAIG3-RFI-SW-C-5980 00 KAIG3-RFI-SW-C-5980-00
KAIG3-RFI-SW-C-5979 00 KAIG3-RFI-SW-C-5979-00
KAIG3-RFI-SW-C-5978 00 KAIG3-RFI-SW-C-5978-00
KAIG3-RFI-SW-C-5977 00 KAIG3-RFI-SW-C-5977-00
KAIG3-RFI-SW-C-5976 00 KAIG3-RFI-SW-C-5976-00
KAIG3-RFI-SW-C-5975 00 KAIG3-RFI-SW-C-5975-00
KAIG3-RFI-SW-C-5974 00 KAIG3-RFI-SW-C-5974-00
KAIG3-RFI-SW-C-5973 00 KAIG3-RFI-SW-C-5973-00
KAIG3-RFI-SW-P-0044 01 KAIG3-RFI-SW-P-0044-01
KAIG3-RFI-SW-C-5971 00 KAIG3-RFI-SW-C-5971-00
KAIG3-RFI-SW-C-5969 00 KAIG3-RFI-SW-C-5969-00
KAIG3-RFI-SW-C-5968 00 KAIG3-RFI-SW-C-5968-00
KAIG3-RFI-SW-C-5967 00 KAIG3-RFI-SW-C-5967-00
KAIG3-RFI-SW-C-5965 00 KAIG3-RFI-SW-C-5965-00
KAIG3-RFI-SW-C-5964 00 KAIG3-RFI-SW-C-5964-00
KAIG3-RFI-SW-C-5963 00 KAIG3-RFI-SW-C-5963-00
KAIG3-RFI-SW-C-5962 00 KAIG3-RFI-SW-C-5962-00
KAIG3-RFI-SW-C-5961 00 KAIG3-RFI-SW-C-5961-00
KAIG3-RFI-SW-C-5960 00 KAIG3-RFI-SW-C-5960-00
KAIG3-RFI-SW-C-5959 00 KAIG3-RFI-SW-C-5959-00
KAIG3-RFI-SW-C-5958 00 KAIG3-RFI-SW-C-5958-00
KAIG3-RFI-SW-C-5956 00 KAIG3-RFI-SW-C-5956-00
KAIG3-RFI-SW-C-5955 00 KAIG3-RFI-SW-C-5955-00
KAIG3-RFI-SW-C-5954 00 KAIG3-RFI-SW-C-5954-00
KAIG3-RFI-SW-C-5945 00 KAIG3-RFI-SW-C-5945-00
KAIG3-RFI-SW-C-5922 00 KAIG3-RFI-SW-C-5922-00
KAIG3-RFI-SW-C-5944 00 KAIG3-RFI-SW-C-5944-00
KAIG3-RFI-SW-C-5943 00 KAIG3-RFI-SW-C-5943-00
KAIG3-RFI-SW-C-5942 00 KAIG3-RFI-SW-C-5942-00
KAIG3-RFI-SW-C-5941 00 KAIG3-RFI-SW-C-5941-00
KAIG3-RFI-SW-C-5940 00 KAIG3-RFI-SW-C-5940-00
KAIG3-RFI-PA-C-5938 00 KAIG3-RFI-PA-C-5938-00
KAIG3-RFI-PA-C-5937 00 KAIG3-RFI-PA-C-5937-00
KAIG3-RFI-SW-C-5939 00 KAIG3-RFI-SW-C-5939-00
KAIG3-RFI-SW-C-5936 00 KAIG3-RFI-SW-C-5936-00
KAIG3-RFI-SW-C-5935 00 KAIG3-RFI-SW-C-5935-00
KAIG3-RFI-SW-C-5934 00 KAIG3-RFI-SW-C-5934-00
KAIG3-RFI-SW-C-5933 00 KAIG3-RFI-SW-C-5933-00
KAIG3-RFI-SW-C-5932 00 KAIG3-RFI-SW-C-5932-00
KAIG3-RFI-SW-C-5931 00 KAIG3-RFI-SW-C-5931-00
KAIG3-RFI-SW-C-5930 00 KAIG3-RFI-SW-C-5930-00
KAIG3-RFI-PA-SS-0325 00 KAIG3-RFI-PA-SS-0325-00
KAIG3-RFI-SW-C-3278 01 KAIG3-RFI-SW-C-3278-01
KAIG3-RFI-SW-C-5895 00 KAIG3-RFI-SW-C-5895-00
KAIG3-RFI-SW-C-5992 00 KAIG3-RFI-SW-C-5992-00
KAIG3-RFI-SW-C-5925 00 KAIG3-RFI-SW-C-5925-00
KAIG3-RFI-SW-C-5924 00 KAIG3-RFI-SW-C-5924-00
KAIG3-RFI-SW-C-5921 00 KAIG3-RFI-SW-C-5921-00
KAIG3-RFI-SW-C-5920 00 KAIG3-RFI-SW-C-5920-00
KAIG3-RFI-SW-C-5919 00 KAIG3-RFI-SW-C-5919-00
KAIG3-RFI-SW-C-5918 00 KAIG3-RFI-SW-C-5918-00
KAIG3-RFI-SW-C-5917 00 KAIG3-RFI-SW-C-5917-00
KAIG3-RFI-SW-C-5916 00 KAIG3-RFI-SW-C-5916-00
KAIG3-RFI-SW-C-5914 00 KAIG3-RFI-SW-C-5914-00
KAIG3-RFI-SW-C-5913 00 KAIG3-RFI-SW-C-5913-00
KAIG3-RFI-SW-C-5622 00 KAIG3-RFI-SW-C-5622-00
KAIG3-RFI-ZG-C-5966 00 KAIG3-RFI-ZG-C-5966-00
KAIG3-RFI-WG-S-7983 00 KAIG3-RFI-WG-S-7983-00
KAIG3-RFI-WG-C-5953 00 KAIG3-RFI-WG-C-5953-00
KAIG3-RFI-MB-S-7982 00 KAIG3-RFI-MB-S-7982-00
KAIG3-RFI-MB-A-0915 00 KAIG3-RFI-MB-A-0915-00
KAIG3-RFI-EC-SU-2670 00 KAIG3-RFI-EC-SU-2670-00
KAIG3-RFI-EC-SU-2669 00 KAIG3-RFI-EC-SU-2669-00
KAIG3-RFI-CO-SS-0313 00 KAIG3-RFI-CO-SS-0313-00
KAIG3-RFI-CC-C-5549 00 KAIG3-RFI-CC-C-5549-00
KAIG3-RFI-EC-SU-2668 00 KAIG3-RFI-EC-SU-2668-00
KAIG3-RFI-CO-SU-2671 00 KAIG3-RFI-CO-SU-2671-00
KAIG3-RFI-CO-SU-2667 00 KAIG3-RFI-CO-SU-2667-00
KAIG3-RFI-CO-S-7975 00 KAIG3-RFI-CO-S-7975-00
KAIG3-RFI-CO-S-7980 00 KAIG3-RFI-CO-S-7980-00
KAIG3-RFI-CO-S-7979 00 KAIG3-RFI-CO-S-7979-00
KAIG3-RFI-CC-S-7978 00 KAIG3-RFI-CC-S-7978-00
KAIG3-RFI-MC-S-7977 00 KAIG3-RFI-MC-S-7977-00
KAIG3-RFI-MC-S-7976 00 KAIG3-RFI-MC-S-7976-00
KAIG3-RFI-CO-S-7969 00 KAIG3-RFI-CO-S-7969-00
KAIG3-RFI-CO-S-7968 00 KAIG3-RFI-CO-S-7968-00
KAIG3-RFI-SG-E-0498 01 KAIG3-RFI-SG-E-0498-01
KAIG3-RFI-SG-E-0497 01 KAIG3-RFI-SG-E-0497-01
KAIG3-RFI-SG-LC-0655 01 KAIG3-RFI-SG-LC-0655-01
KAIG3-RFI-SG-LC-0654 01 KAIG3-RFI-SG-LC-0654-01
KAIG3-RFI-PG-LC-0675 00 KAIG3-RFI-PG-LC-0675-00
KAIG3-RFI-PG-LC-0674 00 KAIG3-RFI-PG-LC-0674-00
KAIG3-RFI-PG-LC-0673 00 KAIG3-RFI-PG-LC-0673-00
KAIG3-RFI-SW-C-5908 00 KAIG3-RFI-SW-C-5908-00
KAIG3-RFI-SW-C-5907 00 KAIG3-RFI-SW-C-5907-00
KAIG3-RFI-SW-C-5906 00 KAIG3-RFI-SW-C-5906-00
KAIG3-RFI-SW-C-5905 00 KAIG3-RFI-SW-C-5905-00
KAIG3-RFI-SW-C-5904 00 KAIG3-RFI-SW-C-5904-00
KAIG3-RFI-SW-C-5900 00 KAIG3-RFI-SW-C-5900-00
KAIG3-RFI-SW-C-5899 00 KAIG3-RFI-SW-C-5899-00
KAIG3-RFI-SW-C-5898 00 KAIG3-RFI-SW-C-5898-00
KAIG3-RFI-SW-C-5897 00 KAIG3-RFI-SW-C-5897-00
KAIG3-RFI-SW-C-5896 00 KAIG3-RFI-SW-C-5896-00
KAIG3-RFI-SW-C-5894 00 KAIG3-RFI-SW-C-5894-00
KAIG3-RFI-SW-C-5893 00 KAIG3-RFI-SW-C-5893-00
KAIG3-RFI-SW-C-5892 00 KAIG3-RFI-SW-C-5892-00
KAIG3-RFI-SW-C-5891 00 KAIG3-RFI-SW-C-5891-00
KAIG3-RFI-SW-C-5890 00 KAIG3-RFI-SW-C-5890-00
KAIG3-RFI-SW-C-5889 00 KAIG3-RFI-SW-C-5889-00
KAIG3-RFI-SW-C-5888 00 KAIG3-RFI-SW-C-5888-00
KAIG3-RFI-SW-C-5886 00 KAIG3-RFI-SW-C-5886-00
KAIG3-RFI-SW-C-5952 00 KAIG3-RFI-SW-C-5952-00
KAIG3-RFI-SW-C-5585 00 KAIG3-RFI-SW-C-5585-00
KAIG3-RFI-CO-SU-2665 00 KAIG3-RFI-CO-SU-2665-00
KAIG3-RFI-CO-SU-2664 00 KAIG3-RFI-CO-SU-2664-00
KAIG3-RFI-PC-SU-2658 00 KAIG3-RFI-PC-SU-2658-00
KAIG3-RFI-CO-SU-2663 00 KAIG3-RFI-CO-SU-2663-00
KAIG3-RFI-MC-SU-2662 00 KAIG3-RFI-MC-SU-2662-00
KAIG3-RFI-CO-SU-2660 00 KAIG3-RFI-CO-SU-2660-00
KAIG3-RFI-CO-C-5929 00 KAIG3-RFI-CO-C-5929-00
KAIG3-RFI-MC-C-5928 00 KAIG3-RFI-MC-C-5928-00
KAIG3-RFI-VG-C-5951 00 KAIG3-RFI-VG-C-5951-00
KAIG3-RFI-ST-S-7967 00 KAIG3-RFI-ST-S-7967-00
KAIG3-RFI-CO-S-7959 00 KAIG3-RFI-CO-S-7959-00
KAIG3-RFI-CO-S-7958 00 KAIG3-RFI-CO-S-7958-00
KAIG3-RFI-CO-S-7957 00 KAIG3-RFI-CO-S-7957-00
KAIG3-RFI-CO-S-7956 00 KAIG3-RFI-CO-S-7956-00
KAIG3-RFI-CO-S-7955 00 KAIG3-RFI-CO-S-7955-00
KAIG3-RFI-MC-S-7954 00 KAIG3-RFI-MC-S-7954-00
KAIG3-RFI-MC-S-7953 00 KAIG3-RFI-MC-S-7953-00
KAIG3-RFI-SM-S-7805 01 KAIG3-RFI-SM-S-7805-01
KAIG3-RFI-SM-S-7804 01 KAIG3-RFI-SM-S-7804-01
KAIG3-RFI-LM-SU-2661 00 KAIG3-RFI-LM-SU-2661-00
KAIG3-RFI-LM-S-7952 00 KAIG3-RFI-LM-S-7952-00
KAIG3-RFI-LM-S-7951 00 KAIG3-RFI-LM-S-7951-00
KAIG3-RFI-LM-S-7950 00 KAIG3-RFI-LM-S-7950-00
KAIG3-RFI-CO-S-7949 00 KAIG3-RFI-CO-S-7949-00
KAIG3-RFI-PC-E-0499 00 KAIG3-RFI-PC-E-0499-00
KAIG3-RFI-ZG-LC-0672 00 KAIG3-RFI-ZG-LC-0672-00
KAIG3-RFI-PG-P-0251 00 KAIG3-RFI-PG-P-0251-00
KAIG3-RFI-MB-A-0914 00 KAIG3-RFI-MB-A-0914-00
KAIG3-RFI-EC-S-7966 00 KAIG3-RFI-EC-S-7966-00
KAIG3-RFI-TG-S-7965 00 KAIG3-RFI-TG-S-7965-00
KAIG3-RFI-TG-S-7964 00 KAIG3-RFI-TG-S-7964-00
KAIG3-RFI-EC-S-7963 00 KAIG3-RFI-EC-S-7963-00
KAIG3-RFI-EC-S-7962 00 KAIG3-RFI-EC-S-7962-00
KAIG3-RFI-TG-S-7961 00 KAIG3-RFI-TG-S-7961-00
KAIG3-RFI-WG-C-5949 00 KAIG3-RFI-WG-C-5949-00
KAIG3-RFI-WG-C-5948 00 KAIG3-RFI-WG-C-5948-00
KAIG3-RFI-EC-C-5947 00 KAIG3-RFI-EC-C-5947-00
KAIG3-RFI-EC-C-5946 00 KAIG3-RFI-EC-C-5946-00
KAIG3-RFI-EC-C-5927 00 KAIG3-RFI-EC-C-5927-00
KAIG3-RFI-MB-C-5926 00 KAIG3-RFI-MB-C-5926-00
KAIG3-RFI-AG-S-7946 00 KAIG3-RFI-AG-S-7946-00
KAIG3-RFI-SW-S-7945 00 KAIG3-RFI-SW-S-7945-00
KAIG3-RFI-AG-S-7944 00 KAIG3-RFI-AG-S-7944-00
KAIG3-RFI-PG-S-7943 00 KAIG3-RFI-PG-S-7943-00
KAIG3-RFI-PG-S-7942 00 KAIG3-RFI-PG-S-7942-00
KAIG3-RFI-PG-S-7941 00 KAIG3-RFI-PG-S-7941-00
KAIG3-RFI-CO-S-7948 00 KAIG3-RFI-CO-S-7948-00
KAIG3-RFI-PC-S-7940 00 KAIG3-RFI-PC-S-7940-00
KAIG3-RFI-CO-SU-2657 00 KAIG3-RFI-CO-SU-2657-00
KAIG3-RFI-CO-S-7937 00 KAIG3-RFI-CO-S-7937-00
KAIG3-RFI-CO-S-7934 00 KAIG3-RFI-CO-S-7934-00
KAIG3-RFI-EC-S-7947 00 KAIG3-RFI-EC-S-7947-00
KAIG3-RFI-CO-S-7933 00 KAIG3-RFI-CO-S-7933-00
KAIG3-RFI-EC-SU-2659 00 KAIG3-RFI-EC-SU-2659-00
KAIG3-RFI-CO-SS-0309 00 KAIG3-RFI-CO-SS-0309-00
KAIG3-RFI-SM-SU-2655 00 KAIG3-RFI-SM-SU-2655-00
KAIG3-RFI-CO-SU-2656 00 KAIG3-RFI-CO-SU-2656-00
KAIG3-RFI-CO-SU-2654 00 KAIG3-RFI-CO-SU-2654-00
KAIG3-RFI-CO-SU-2653 00 KAIG3-RFI-CO-SU-2653-00
KAIG3-RFI-CO-S-7935 00 KAIG3-RFI-CO-S-7935-00
KAIG3-RFI-CO-S-7936 00 KAIG3-RFI-CO-S-7936-00
KAIG3-RFI-SM-S-7931 00 KAIG3-RFI-SM-S-7931-00
KAIG3-RFI-SM-S-7932 00 KAIG3-RFI-SM-S-7932-00
KAIG3-RFI-CO-S-7929 00 KAIG3-RFI-CO-S-7929-00
KAIG3-RFI-CO-S-7928 00 KAIG3-RFI-CO-S-7928-00
KAIG3-RFI-CO-S-7927 00 KAIG3-RFI-CO-S-7927-00
KAIG3-RFI-MC-S-7926 00 KAIG3-RFI-MC-S-7926-00
KAIG3-RFI-CO-S-7925 00 KAIG3-RFI-CO-S-7925-00
KAIG3-RFI-CO-S-7782 00 KAIG3-RFI-CO-S-7782-00
KAIG3-RFI-CO-S-7923 00 KAIG3-RFI-CO-S-7923-00
KAIG3-RFI-CO-S-7922 00 KAIG3-RFI-CO-S-7922-00
KAIG3-RFI-CO-S-7774 00 KAIG3-RFI-CO-S-7774-00
KAIG3-RFI-CO-S-7838 00 KAIG3-RFI-CO-S-7838-00
KAIG3-RFI-MB-LC-0649 00 KAIG3-RFI-MB-LC-0649-00
KAIG3-RFI-MB-LC-0648 00 KAIG3-RFI-MB-LC-0648-00
KAIG3-RFI-CO-A-0913 00 KAIG3-RFI-CO-A-0913-00
KAIG3-RFI-MB-A-0912 00 KAIG3-RFI-MB-A-0912-00
KAIG3-RFI-WG-SU-2652 00 KAIG3-RFI-WG-SU-2652-00
KAIG3-RFI-MB-S-7921 00 KAIG3-RFI-MB-S-7921-00
KAIG3-RFI-WG-S-7920 00 KAIG3-RFI-WG-S-7920-00
KAIG3-RFI-WG-S-7919 00 KAIG3-RFI-WG-S-7919-00
KAIG3-RFI-EC-S-7918 00 KAIG3-RFI-EC-S-7918-00
KAIG3-RFI-WG-S-7895 00 KAIG3-RFI-WG-S-7895-00
KAIG3-RFI-PG-S-7821 01 KAIG3-RFI-PG-S-7821-01
KAIG3-RFI-MB-C-5903 00 KAIG3-RFI-MB-C-5903-00
KAIG3-RFI-EC-C-5902 00 KAIG3-RFI-EC-C-5902-00
KAIG3-RFI-EC-C-5901 00 KAIG3-RFI-EC-C-5901-00
KAIG3-RFI-WG-C-5885 00 KAIG3-RFI-WG-C-5885-00
KAIG3-RFI-SM-S-7708 00 KAIG3-RFI-SM-S-7708-00
KAIG3-RFI-WG-A-0816 01 KAIG3-RFI-WG-A-0816-01
KAIG3-RFI-WG-A-0815 01 KAIG3-RFI-WG-A-0815-01
KAIG3-RFI-WG-A-0814 01 KAIG3-RFI-WG-A-0814-01
KAIG3-RFI-PG-LC-0671 00 KAIG3-RFI-PG-LC-0671-00
KAIG3-RFI-ZG-LC-0670 00 KAIG3-RFI-ZG-LC-0670-00
KAIG3-RFI-PC-LC-0664 00 KAIG3-RFI-PC-LC-0664-00
KAIG3-RFI-SW-C-5884 00 KAIG3-RFI-SW-C-5884-00
KAIG3-RFI-SW-C-5883 00 KAIG3-RFI-SW-C-5883-00
KAIG3-RFI-SW-C-5882 00 KAIG3-RFI-SW-C-5882-00
KAIG3-RFI-SW-C-5880 00 KAIG3-RFI-SW-C-5880-00
KAIG3-RFI-SW-C-5879 00 KAIG3-RFI-SW-C-5879-00
KAIG3-RFI-SW-C-5878 00 KAIG3-RFI-SW-C-5878-00
KAIG3-RFI-SW-C-5877 00 KAIG3-RFI-SW-C-5877-00
KAIG3-RFI-SW-C-5876 00 KAIG3-RFI-SW-C-5876-00
KAIG3-RFI-SW-C-5875 00 KAIG3-RFI-SW-C-5875-00
KAIG3-RFI-PA-C-5869 00 KAIG3-RFI-PA-C-5869-00
KAIG3-RFI-PA-C-5868 00 KAIG3-RFI-PA-C-5868-00
KAIG3-RFI-SW-C-5872 00 KAIG3-RFI-SW-C-5872-00
KAIG3-RFI-SW-C-5871 00 KAIG3-RFI-SW-C-5871-00
KAIG3-RFI-SW-C-5870 00 KAIG3-RFI-SW-C-5870-00
KAIG3-RFI-SW-C-5867 00 KAIG3-RFI-SW-C-5867-00
KAIG3-RFI-SW-C-5866 00 KAIG3-RFI-SW-C-5866-00
KAIG3-RFI-SW-C-5865 00 KAIG3-RFI-SW-C-5865-00
KAIG3-RFI-SW-C-5864 00 KAIG3-RFI-SW-C-5864-00
KAIG3-RFI-SW-C-5863 00 KAIG3-RFI-SW-C-5863-00
KAIG3-RFI-SW-C-5850 00 KAIG3-RFI-SW-C-5850-00
KAIG3-RFI-CO-SS-0305 00 KAIG3-RFI-CO-SS-0305-00
KAIG3-RFI-CO-SS-0304 00 KAIG3-RFI-CO-SS-0304-00
KAIG3-RFI-CO-SS-0306 00 KAIG3-RFI-CO-SS-0306-00
KAIG3-RFI-CO-SS-0308 00 KAIG3-RFI-CO-SS-0308-00
KAIG3-RFI-CO-SU-2651 00 KAIG3-RFI-CO-SU-2651-00
KAIG3-RFI-CO-S-7916 00 KAIG3-RFI-CO-S-7916-00
KAIG3-RFI-CO-S-7915 00 KAIG3-RFI-CO-S-7915-00
KAIG3-RFI-CO-S-7914 00 KAIG3-RFI-CO-S-7914-00
KAIG3-RFI-CO-S-7913 00 KAIG3-RFI-CO-S-7913-00
KAIG3-RFI-CO-S-7912 00 KAIG3-RFI-CO-S-7912-00
KAIG3-RFI-CO-S-7911 00 KAIG3-RFI-CO-S-7911-00
KAIG3-RFI-CO-S-7853 00 KAIG3-RFI-CO-S-7853-00
KAIG3-RFI-SW-C-5849 00 KAIG3-RFI-SW-C-5849-00
KAIG3-RFI-PA-SS-0307 00 KAIG3-RFI-PA-SS-0307-00
KAIG3-RFI-SW-LS-1416 00 KAIG3-RFI-SW-LS-1416-00
KAIG3-RFI-EC-S-7894 00 KAIG3-RFI-EC-S-7894-00
KAIG3-RFI-EC-SU-2650 00 KAIG3-RFI-EC-SU-2650-00
KAIG3-RFI-MB-C-5862 00 KAIG3-RFI-MB-C-5862-00
KAIG3-RFI-PG-C-5861 00 KAIG3-RFI-PG-C-5861-00
KAIG3-RFI-EC-C-5860 00 KAIG3-RFI-EC-C-5860-00
KAIG3-RFI-PT-A-0911 00 KAIG3-RFI-PT-A-0911-00
KAIG3-RFI-EC-SU-2641 00 KAIG3-RFI-EC-SU-2641-00
KAIG3-RFI-ZG-S-7882 00 KAIG3-RFI-ZG-S-7882-00
KAIG3-RFI-EC-S-7881 00 KAIG3-RFI-EC-S-7881-00
KAIG3-RFI-EC-S-7880 00 KAIG3-RFI-EC-S-7880-00
KAIG3-RFI-MB-A-0910 00 KAIG3-RFI-MB-A-0910-00
KAIG3-RFI-MB-A-0909 00 KAIG3-RFI-MB-A-0909-00
KAIG3-RFI-MB-A-0908 00 KAIG3-RFI-MB-A-0908-00
KAIG3-RFI-MC-C-5881 00 KAIG3-RFI-MC-C-5881-00
KAIG3-RFI-WG-C-5462 00 KAIG3-RFI-WG-C-5462-00
KAIG3-RFI-WG-C-5855 00 KAIG3-RFI-WG-C-5855-00
KAIG3-RFI-CO-SS-0294 00 KAIG3-RFI-CO-SS-0294-00
KAIG3-RFI-CO-S-7904 00 KAIG3-RFI-CO-S-7904-00
KAIG3-RFI-WG-C-5854 00 KAIG3-RFI-WG-C-5854-00
KAIG3-RFI-CO-S-7905 00 KAIG3-RFI-CO-S-7905-00
KAIG3-RFI-PG-C-5853 00 KAIG3-RFI-PG-C-5853-00
KAIG3-RFI-EC-C-5852 00 KAIG3-RFI-EC-C-5852-00
KAIG3-RFI-EC-C-5840 00 KAIG3-RFI-EC-C-5840-00
KAIG3-RFI-CO-SS-0303 00 KAIG3-RFI-CO-SS-0303-00
KAIG3-RFI-PG-C-5839 00 KAIG3-RFI-PG-C-5839-00
KAIG3-RFI-CO-SS-0302 00 KAIG3-RFI-CO-SS-0302-00
KAIG3-RFI-CO-SS-0299 00 KAIG3-RFI-CO-SS-0299-00
KAIG3-RFI-CO-S-7903 00 KAIG3-RFI-CO-S-7903-00
KAIG3-RFI-CO-SS-0298 00 KAIG3-RFI-CO-SS-0298-00
KAIG3-RFI-CO-SU-2647 00 KAIG3-RFI-CO-SU-2647-00
KAIG3-RFI-CO-S-7902 00 KAIG3-RFI-CO-S-7902-00
KAIG3-RFI-CO-SS-0297 00 KAIG3-RFI-CO-SS-0297-00
KAIG3-RFI-AG-SS-0296 00 KAIG3-RFI-AG-SS-0296-00
KAIG3-RFI-CO-SU-2648 00 KAIG3-RFI-CO-SU-2648-00
KAIG3-RFI-CO-SS-0295 00 KAIG3-RFI-CO-SS-0295-00
KAIG3-RFI-CO-SS-0293 00 KAIG3-RFI-CO-SS-0293-00
KAIG3-RFI-CO-SU-2649 00 KAIG3-RFI-CO-SU-2649-00
KAIG3-RFI-CO-SS-0291 00 KAIG3-RFI-CO-SS-0291-00
KAIG3-RFI-CO-S-7908 00 KAIG3-RFI-CO-S-7908-00
KAIG3-RFI-CO-SS-0292 00 KAIG3-RFI-CO-SS-0292-00
KAIG3-RFI-CO-S-7907 00 KAIG3-RFI-CO-S-7907-00
KAIG3-RFI-CO-SS-0289 00 KAIG3-RFI-CO-SS-0289-00
KAIG3-RFI-CO-S-7906 00 KAIG3-RFI-CO-S-7906-00
KAIG3-RFI-MC-S-7910 00 KAIG3-RFI-MC-S-7910-00
KAIG3-RFI-CO-S-7909 00 KAIG3-RFI-CO-S-7909-00
KAIG3-RFI-CO-S-7841 00 KAIG3-RFI-CO-S-7841-00
KAIG3-RFI-CO-S-7896 00 KAIG3-RFI-CO-S-7896-00
KAIG3-RFI-CO-S-7898 00 KAIG3-RFI-CO-S-7898-00
KAIG3-RFI-CO-SU-2645 00 KAIG3-RFI-CO-SU-2645-00
KAIG3-RFI-CO-S-7897 00 KAIG3-RFI-CO-S-7897-00
KAIG3-RFI-CO-S-7901 00 KAIG3-RFI-CO-S-7901-00
KAIG3-RFI-CO-S-7900 00 KAIG3-RFI-CO-S-7900-00
KAIG3-RFI-CO-SU-2646 00 KAIG3-RFI-CO-SU-2646-00
KAIG3-RFI-CO-S-7899 00 KAIG3-RFI-CO-S-7899-00
KAIG3-RFI-CF-S-7893 00 KAIG3-RFI-CF-S-7893-00
KAIG3-RFI-CO-S-7890 00 KAIG3-RFI-CO-S-7890-00
KAIG3-RFI-CO-S-7889 00 KAIG3-RFI-CO-S-7889-00
KAIG3-RFI-ZG-LC-0669 00 KAIG3-RFI-ZG-LC-0669-00
KAIG3-RFI-CO-S-7888 00 KAIG3-RFI-CO-S-7888-00
KAIG3-RFI-ZG-LC-0668 00 KAIG3-RFI-ZG-LC-0668-00
KAIG3-RFI-CO-S-7887 00 KAIG3-RFI-CO-S-7887-00
KAIG3-RFI-CO-S-7886 00 KAIG3-RFI-CO-S-7886-00
KAIG3-RFI-CF-LC-0667 00 KAIG3-RFI-CF-LC-0667-00
KAIG3-RFI-CF-LC-0666 00 KAIG3-RFI-CF-LC-0666-00
KAIG3-RFI-CO-S-7892 00 KAIG3-RFI-CO-S-7892-00
KAIG3-RFI-CF-LC-0665 00 KAIG3-RFI-CF-LC-0665-00
KAIG3-RFI-CO-S-7891 00 KAIG3-RFI-CO-S-7891-00
KAIG3-RFI-CO-SU-2643 00 KAIG3-RFI-CO-SU-2643-00
KAIG3-RFI-CO-SU-2644 00 KAIG3-RFI-CO-SU-2644-00
KAIG3-RFI-CO-SU-2635 00 KAIG3-RFI-CO-SU-2635-00
KAIG3-RFI-CO-SS-0285 00 KAIG3-RFI-CO-SS-0285-00
KAIG3-RFI-SW-C-5857 00 KAIG3-RFI-SW-C-5857-00
KAIG3-RFI-SW-C-5856 00 KAIG3-RFI-SW-C-5856-00
KAIG3-RFI-SW-C-5858 00 KAIG3-RFI-SW-C-5858-00
KAIG3-RFI-CO-C-5480 00 KAIG3-RFI-CO-C-5480-00
KAIG3-RFI-MC-C-5859 00 KAIG3-RFI-MC-C-5859-00
KAIG3-RFI-SW-C-5848 00 KAIG3-RFI-SW-C-5848-00
KAIG3-RFI-MC-S-7875 00 KAIG3-RFI-MC-S-7875-00
KAIG3-RFI-SW-C-5847 00 KAIG3-RFI-SW-C-5847-00
KAIG3-RFI-CO-S-7874 00 KAIG3-RFI-CO-S-7874-00
KAIG3-RFI-SW-C-5846 00 KAIG3-RFI-SW-C-5846-00
KAIG3-RFI-CO-SU-2637 00 KAIG3-RFI-CO-SU-2637-00
KAIG3-RFI-SW-C-5845 00 KAIG3-RFI-SW-C-5845-00
KAIG3-RFI-CO-S-7873 00 KAIG3-RFI-CO-S-7873-00
KAIG3-RFI-SW-C-5844 00 KAIG3-RFI-SW-C-5844-00
KAIG3-RFI-SW-C-5843 00 KAIG3-RFI-SW-C-5843-00
KAIG3-RFI-CO-SU-2642 00 KAIG3-RFI-CO-SU-2642-00
KAIG3-RFI-SW-C-5842 00 KAIG3-RFI-SW-C-5842-00
KAIG3-RFI-CO-S-7884 00 KAIG3-RFI-CO-S-7884-00
KAIG3-RFI-SW-C-5841 00 KAIG3-RFI-SW-C-5841-00
KAIG3-RFI-CO-S-7872 00 KAIG3-RFI-CO-S-7872-00
KAIG3-RFI-SW-C-5615 01 KAIG3-RFI-SW-C-5615-01
KAIG3-RFI-CO-S-7871 00 KAIG3-RFI-CO-S-7871-00
KAIG3-RFI-SW-C-5614 01 KAIG3-RFI-SW-C-5614-01
KAIG3-RFI-SW-C-5613 01 KAIG3-RFI-SW-C-5613-01
KAIG3-RFI-CO-SU-2636 00 KAIG3-RFI-CO-SU-2636-00
KAIG3-RFI-SW-C-5256 01 KAIG3-RFI-SW-C-5256-01
KAIG3-RFI-MC-SU-2640 00 KAIG3-RFI-MC-SU-2640-00
KAIG3-RFI-MC-SU-2639 00 KAIG3-RFI-MC-SU-2639-00
KAIG3-RFI-MC-SU-2638 00 KAIG3-RFI-MC-SU-2638-00
KAIG3-RFI-MC-S-7878 00 KAIG3-RFI-MC-S-7878-00
KAIG3-RFI-MC-S-7879 00 KAIG3-RFI-MC-S-7879-00
KAIG3-RFI-MC-S-7883 00 KAIG3-RFI-MC-S-7883-00
KAIG3-RFI-MC-S-7876 00 KAIG3-RFI-MC-S-7876-00
KAIG3-RFI-MC-S-7877 00 KAIG3-RFI-MC-S-7877-00
KAIG3-RFI-CO-S-7869 00 KAIG3-RFI-CO-S-7869-00
KAIG3-RFI-MB-S-7107 01 KAIG3-RFI-MB-S-7107-01
KAIG3-RFI-WG-A-0907 00 KAIG3-RFI-WG-A-0907-00
KAIG3-RFI-WG-A-0906 00 KAIG3-RFI-WG-A-0906-00
KAIG3-RFI-WG-A-0905 00 KAIG3-RFI-WG-A-0905-00
KAIG3-RFI-MB-C-5838 00 KAIG3-RFI-MB-C-5838-00
KAIG3-RFI-EC-C-5832 00 KAIG3-RFI-EC-C-5832-00
KAIG3-RFI-EC-C-5816 00 KAIG3-RFI-EC-C-5816-00
KAIG3-RFI-EC-S-7864 00 KAIG3-RFI-EC-S-7864-00
KAIG3-RFI-SW-S-7863 00 KAIG3-RFI-SW-S-7863-00
KAIG3-RFI-SG-LC-0663 00 KAIG3-RFI-SG-LC-0663-00
KAIG3-RFI-SG-LC-0662 00 KAIG3-RFI-SG-LC-0662-00
KAIG3-RFI-SG-E-0498 00 KAIG3-RFI-SG-E-0498-00
KAIG3-RFI-SW-C-5837 00 KAIG3-RFI-SW-C-5837-00
KAIG3-RFI-SW-C-5836 00 KAIG3-RFI-SW-C-5836-00
KAIG3-RFI-SW-C-5835 00 KAIG3-RFI-SW-C-5835-00
KAIG3-RFI-SW-C-5834 00 KAIG3-RFI-SW-C-5834-00
KAIG3-RFI-SW-C-5833 00 KAIG3-RFI-SW-C-5833-00
KAIG3-RFI-SW-C-5830 00 KAIG3-RFI-SW-C-5830-00
KAIG3-RFI-SW-C-5829 00 KAIG3-RFI-SW-C-5829-00
KAIG3-RFI-SW-C-5828 00 KAIG3-RFI-SW-C-5828-00
KAIG3-RFI-SW-C-5827 00 KAIG3-RFI-SW-C-5827-00
KAIG3-RFI-SW-C-5826 00 KAIG3-RFI-SW-C-5826-00
KAIG3-RFI-SW-C-5825 00 KAIG3-RFI-SW-C-5825-00
KAIG3-RFI-SW-C-5824 00 KAIG3-RFI-SW-C-5824-00
KAIG3-RFI-SW-C-5823 00 KAIG3-RFI-SW-C-5823-00
KAIG3-RFI-SW-C-5822 00 KAIG3-RFI-SW-C-5822-00
KAIG3-RFI-SW-C-5821 00 KAIG3-RFI-SW-C-5821-00
KAIG3-RFI-SW-C-5815 00 KAIG3-RFI-SW-C-5815-00
KAIG3-RFI-SW-C-5814 00 KAIG3-RFI-SW-C-5814-00
KAIG3-RFI-SW-C-5585 01 KAIG3-RFI-SW-C-5585-01
KAIG3-RFI-SW-C-5584 01 KAIG3-RFI-SW-C-5584-01
KAIG3-RFI-SW-C-5583 01 KAIG3-RFI-SW-C-5583-01
KAIG3-RFI-PC-P-0250 00 KAIG3-RFI-PC-P-0250-00
KAIG3-RFI-WG-P-0249 00 KAIG3-RFI-WG-P-0249-00
KAIG3-RFI-SW-LS-1415 00 KAIG3-RFI-SW-LS-1415-00
KAIG3-RFI-SW-LS-1414 00 KAIG3-RFI-SW-LS-1414-00
KAIG3-RFI-SW-LS-1413 00 KAIG3-RFI-SW-LS-1413-00
KAIG3-RFI-CO-S-7753 00 KAIG3-RFI-CO-S-7753-00
KAIG3-RFI-PC-S-7807 00 KAIG3-RFI-PC-S-7807-00
KAIG3-RFI-PC-S-7617 00 KAIG3-RFI-PC-S-7617-00
KAIG3-RFI-CO-S-7655 00 KAIG3-RFI-CO-S-7655-00
KAIG3-RFI-CO-S-7867 00 KAIG3-RFI-CO-S-7867-00
KAIG3-RFI-CO-S-7868 00 KAIG3-RFI-CO-S-7868-00
KAIG3-RFI-CO-S-7862 00 KAIG3-RFI-CO-S-7862-00
KAIG3-RFI-EC-SU-2630 00 KAIG3-RFI-EC-SU-2630-00
KAIG3-RFI-PC-S-7865 00 KAIG3-RFI-PC-S-7865-00
KAIG3-RFI-WG-S-7839 00 KAIG3-RFI-WG-S-7839-00
KAIG3-RFI-PC-S-7866 00 KAIG3-RFI-PC-S-7866-00
KAIG3-RFI-PC-SU-2634 00 KAIG3-RFI-PC-SU-2634-00
KAIG3-RFI-PG-S-7857 00 KAIG3-RFI-PG-S-7857-00
KAIG3-RFI-CO-SU-2633 00 KAIG3-RFI-CO-SU-2633-00
KAIG3-RFI-MC-C-5831 00 KAIG3-RFI-MC-C-5831-00
KAIG3-RFI-TG-S-7855 00 KAIG3-RFI-TG-S-7855-00
KAIG3-RFI-EC-S-7854 00 KAIG3-RFI-EC-S-7854-00
KAIG3-RFI-WG-C-5820 00 KAIG3-RFI-WG-C-5820-00
KAIG3-RFI-WG-C-5819 00 KAIG3-RFI-WG-C-5819-00
KAIG3-RFI-PG-C-5818 00 KAIG3-RFI-PG-C-5818-00
KAIG3-RFI-TG-C-5817 00 KAIG3-RFI-TG-C-5817-00
KAIG3-RFI-DG-C-0714 01 KAIG3-RFI-DG-C-0714-01
KAIG3-RFI-SW-A-0875 02 KAIG3-RFI-SW-A-0875-02
KAIG3-RFI-SW-A-0874 02 KAIG3-RFI-SW-A-0874-02
KAIG3-RFI-SW-C-5813 00 KAIG3-RFI-SW-C-5813-00
KAIG3-RFI-SW-C-5812 00 KAIG3-RFI-SW-C-5812-00
KAIG3-RFI-SW-C-5811 00 KAIG3-RFI-SW-C-5811-00
KAIG3-RFI-SW-C-5810 00 KAIG3-RFI-SW-C-5810-00
KAIG3-RFI-SW-C-5809 00 KAIG3-RFI-SW-C-5809-00
KAIG3-RFI-SW-C-5808 00 KAIG3-RFI-SW-C-5808-00
KAIG3-RFI-SW-C-5807 00 KAIG3-RFI-SW-C-5807-00
KAIG3-RFI-SW-C-5806 00 KAIG3-RFI-SW-C-5806-00
KAIG3-RFI-SW-C-5805 00 KAIG3-RFI-SW-C-5805-00
KAIG3-RFI-SW-C-5691 01 KAIG3-RFI-SW-C-5691-01
KAIG3-RFI-SW-C-5690 01 KAIG3-RFI-SW-C-5690-01
KAIG3-RFI-SW-C-5689 01 KAIG3-RFI-SW-C-5689-01
KAIG3-RFI-CO-SU-2631 00 KAIG3-RFI-CO-SU-2631-00
KAIG3-RFI-CO-S-7859 00 KAIG3-RFI-CO-S-7859-00
KAIG3-RFI-CO-S-7860 00 KAIG3-RFI-CO-S-7860-00
KAIG3-RFI-CO-S-7851 00 KAIG3-RFI-CO-S-7851-00
KAIG3-RFI-CO-S-7850 00 KAIG3-RFI-CO-S-7850-00
KAIG3-RFI-CO-S-7849 00 KAIG3-RFI-CO-S-7849-00
KAIG3-RFI-CO-S-7847 00 KAIG3-RFI-CO-S-7847-00
KAIG3-RFI-CO-S-7848 00 KAIG3-RFI-CO-S-7848-00
KAIG3-RFI-CO-S-7858 00 KAIG3-RFI-CO-S-7858-00
KAIG3-RFI-CO-S-7846 00 KAIG3-RFI-CO-S-7846-00
KAIG3-RFI-CO-S-7845 00 KAIG3-RFI-CO-S-7845-00
KAIG3-RFI-CO-S-7834 00 KAIG3-RFI-CO-S-7834-00
KAIG3-RFI-CO-SU-2629 00 KAIG3-RFI-CO-SU-2629-00
KAIG3-RFI-CO-SS-0276 01 KAIG3-RFI-CO-SS-0276-01
KAIG3-RFI-CO-S-3654 03 KAIG3-RFI-CO-S-3654-03
KAIG3-RFI-CC-C-4577 01 KAIG3-RFI-CC-C-4577-01
KAIG3-RFI-CO-C-2022 02 KAIG3-RFI-CO-C-2022-02
KAIG3-RFI-CO-S-6482 01 KAIG3-RFI-CO-S-6482-01
KAIG3-RFI-CO-S-4987 01 KAIG3-RFI-CO-S-4987-01
KAIG3-RFI-CO-S-4594 01 KAIG3-RFI-CO-S-4594-01
KAIG3-RFI-CO-S-7757 01 KAIG3-RFI-CO-S-7757-01
KAIG3-RFI-MC-S-7245 01 KAIG3-RFI-MC-S-7245-01
KAIG3-RFI-CO-S-7699 01 KAIG3-RFI-CO-S-7699-01
KAIG3-RFI-CO-S-7852 00 KAIG3-RFI-CO-S-7852-00
KAIG3-RFI-SW-LS-1411 00 KAIG3-RFI-SW-LS-1411-00
KAIG3-RFI-SW-P-0248 00 KAIG3-RFI-SW-P-0248-00
KAIG3-RFI-SW-P-0247 00 KAIG3-RFI-SW-P-0247-00
KAIG3-RFI-WG-P-0246 00 KAIG3-RFI-WG-P-0246-00
KAIG3-RFI-WG-P-0245 00 KAIG3-RFI-WG-P-0245-00
KAIG3-RFI-VG-LC-0658 00 KAIG3-RFI-VG-LC-0658-00
KAIG3-RFI-VG-LC-0657 00 KAIG3-RFI-VG-LC-0657-00
KAIG3-RFI-CF-LC-0656 00 KAIG3-RFI-CF-LC-0656-00
KAIG3-RFI-SG-LC-0655 00 KAIG3-RFI-SG-LC-0655-00
KAIG3-RFI-SG-LC-0654 00 KAIG3-RFI-SG-LC-0654-00
KAIG3-RFI-SG-E-0497 00 KAIG3-RFI-SG-E-0497-00
KAIG3-RFI-PC-LC-0661 00 KAIG3-RFI-PC-LC-0661-00
KAIG3-RFI-ST-LC-0660 00 KAIG3-RFI-ST-LC-0660-00
KAIG3-RFI-ST-LC-0659 00 KAIG3-RFI-ST-LC-0659-00
KAIG3-RFI-VG-SU-2632 00 KAIG3-RFI-VG-SU-2632-00
KAIG3-RFI-CF-S-7861 00 KAIG3-RFI-CF-S-7861-00
KAIG3-RFI-CF-S-7776 00 KAIG3-RFI-CF-S-7776-00
KAIG3-RFI-WG-C-5804 00 KAIG3-RFI-WG-C-5804-00
KAIG3-RFI-CF-S-7798 00 KAIG3-RFI-CF-S-7798-00
KAIG3-RFI-WG-C-5803 00 KAIG3-RFI-WG-C-5803-00
KAIG3-RFI-EC-C-5799 00 KAIG3-RFI-EC-C-5799-00
KAIG3-RFI-EC-C-5798 00 KAIG3-RFI-EC-C-5798-00
KAIG3-RFI-EC-C-5797 00 KAIG3-RFI-EC-C-5797-00
KAIG3-RFI-CO-S-6605 00 KAIG3-RFI-CO-S-6605-00
KAIG3-RFI-EC-S-7840 00 KAIG3-RFI-EC-S-7840-00
KAIG3-RFI-CO-S-6609 00 KAIG3-RFI-CO-S-6609-00
KAIG3-RFI-WG-SU-2622 00 KAIG3-RFI-WG-SU-2622-00
KAIG3-RFI-NR-LC-0653 00 KAIG3-RFI-NR-LC-0653-00
KAIG3-RFI-PC-LC-0652 00 KAIG3-RFI-PC-LC-0652-00
KAIG3-RFI-PC-LC-0651 00 KAIG3-RFI-PC-LC-0651-00
KAIG3-RFI-PC-LC-0650 00 KAIG3-RFI-PC-LC-0650-00
KAIG3-RFI-SW-C-5778 00 KAIG3-RFI-SW-C-5778-00
KAIG3-RFI-SW-C-5777 00 KAIG3-RFI-SW-C-5777-00
KAIG3-RFI-CO-E-0496 00 KAIG3-RFI-CO-E-0496-00
KAIG3-RFI-CO-E-0495 00 KAIG3-RFI-CO-E-0495-00
KAIG3-RFI-CO-E-0494 00 KAIG3-RFI-CO-E-0494-00
KAIG3-RFI-CO-E-0493 00 KAIG3-RFI-CO-E-0493-00
KAIG3-RFI-PC-E-0492 00 KAIG3-RFI-PC-E-0492-00
KAIG3-RFI-WG-E-0491 00 KAIG3-RFI-WG-E-0491-00
KAIG3-RFI-WG-E-0490 00 KAIG3-RFI-WG-E-0490-00
KAIG3-RFI-SW-C-5802 00 KAIG3-RFI-SW-C-5802-00
KAIG3-RFI-SW-C-5801 00 KAIG3-RFI-SW-C-5801-00
KAIG3-RFI-SW-C-5800 00 KAIG3-RFI-SW-C-5800-00
KAIG3-RFI-SW-C-5795 00 KAIG3-RFI-SW-C-5795-00
KAIG3-RFI-SW-C-5794 00 KAIG3-RFI-SW-C-5794-00
KAIG3-RFI-SW-C-5793 00 KAIG3-RFI-SW-C-5793-00
KAIG3-RFI-SW-C-5792 00 KAIG3-RFI-SW-C-5792-00
KAIG3-RFI-SW-C-5791 00 KAIG3-RFI-SW-C-5791-00
KAIG3-RFI-SW-C-5790 00 KAIG3-RFI-SW-C-5790-00
KAIG3-RFI-SW-C-5789 00 KAIG3-RFI-SW-C-5789-00
KAIG3-RFI-SW-C-5788 00 KAIG3-RFI-SW-C-5788-00
KAIG3-RFI-SW-C-5661 01 KAIG3-RFI-SW-C-5661-01
KAIG3-RFI-MC-C-5796 00 KAIG3-RFI-MC-C-5796-00
KAIG3-RFI-CO-S-7835 00 KAIG3-RFI-CO-S-7835-00
KAIG3-RFI-CO-SU-2628 00 KAIG3-RFI-CO-SU-2628-00
KAIG3-RFI-CO-S-7837 00 KAIG3-RFI-CO-S-7837-00
KAIG3-RFI-CO-S-7836 00 KAIG3-RFI-CO-S-7836-00
KAIG3-RFI-MC-SU-2627 00 KAIG3-RFI-MC-SU-2627-00
KAIG3-RFI-MC-S-7833 00 KAIG3-RFI-MC-S-7833-00
KAIG3-RFI-MC-S-7832 00 KAIG3-RFI-MC-S-7832-00
KAIG3-RFI-CO-S-7830 00 KAIG3-RFI-CO-S-7830-00
KAIG3-RFI-CO-S-7831 00 KAIG3-RFI-CO-S-7831-00
KAIG3-RFI-VG-SU-2626 00 KAIG3-RFI-VG-SU-2626-00
KAIG3-RFI-PG-C-5787 00 KAIG3-RFI-PG-C-5787-00
KAIG3-RFI-AG-LS-1410 00 KAIG3-RFI-AG-LS-1410-00
KAIG3-RFI-CO-SS-0290 00 KAIG3-RFI-CO-SS-0290-00
KAIG3-RFI-TG-S-7713 01 KAIG3-RFI-TG-S-7713-01
KAIG3-RFI-CO-SS-0286 00 KAIG3-RFI-CO-SS-0286-00
KAIG3-RFI-CO-SS-0287 00 KAIG3-RFI-CO-SS-0287-00
KAIG3-RFI-CO-SS-0288 00 KAIG3-RFI-CO-SS-0288-00
KAIG3-RFI-TT-A-0904 00 KAIG3-RFI-TT-A-0904-00
KAIG3-RFI-CO-S-7829 00 KAIG3-RFI-CO-S-7829-00
KAIG3-RFI-TG-S-7712 01 KAIG3-RFI-TG-S-7712-01
KAIG3-RFI-WG-S-7700 01 KAIG3-RFI-WG-S-7700-01
KAIG3-RFI-TB-S-7822 00 KAIG3-RFI-TB-S-7822-00
KAIG3-RFI-PG-S-7821 00 KAIG3-RFI-PG-S-7821-00
KAIG3-RFI-WG-S-7820 00 KAIG3-RFI-WG-S-7820-00
KAIG3-RFI-WG-S-7819 00 KAIG3-RFI-WG-S-7819-00
KAIG3-RFI-WG-S-7818 00 KAIG3-RFI-WG-S-7818-00
KAIG3-RFI-EC-S-7817 00 KAIG3-RFI-EC-S-7817-00
KAIG3-RFI-TB-SU-2621 00 KAIG3-RFI-TB-SU-2621-00
KAIG3-RFI-EC-SU-2620 00 KAIG3-RFI-EC-SU-2620-00
KAIG3-RFI-SW-C-5786 00 KAIG3-RFI-SW-C-5786-00
KAIG3-RFI-SW-C-5785 00 KAIG3-RFI-SW-C-5785-00
KAIG3-RFI-SW-C-5784 00 KAIG3-RFI-SW-C-5784-00
KAIG3-RFI-SW-C-5783 00 KAIG3-RFI-SW-C-5783-00
KAIG3-RFI-SW-C-5782 00 KAIG3-RFI-SW-C-5782-00
KAIG3-RFI-SW-C-5781 00 KAIG3-RFI-SW-C-5781-00
KAIG3-RFI-SW-C-5780 00 KAIG3-RFI-SW-C-5780-00
KAIG3-RFI-SW-C-5779 00 KAIG3-RFI-SW-C-5779-00
KAIG3-RFI-SW-C-5775 00 KAIG3-RFI-SW-C-5775-00
KAIG3-RFI-SW-C-5774 00 KAIG3-RFI-SW-C-5774-00
KAIG3-RFI-SW-C-5773 00 KAIG3-RFI-SW-C-5773-00
KAIG3-RFI-SW-C-5772 00 KAIG3-RFI-SW-C-5772-00
KAIG3-RFI-SW-C-5771 00 KAIG3-RFI-SW-C-5771-00
KAIG3-RFI-SW-C-5770 00 KAIG3-RFI-SW-C-5770-00
KAIG3-RFI-SW-C-5769 00 KAIG3-RFI-SW-C-5769-00
KAIG3-RFI-SW-C-5768 00 KAIG3-RFI-SW-C-5768-00
KAIG3-RFI-SW-C-5767 00 KAIG3-RFI-SW-C-5767-00
KAIG3-RFI-SW-C-5766 00 KAIG3-RFI-SW-C-5766-00
KAIG3-RFI-SW-C-5765 00 KAIG3-RFI-SW-C-5765-00
KAIG3-RFI-PC-E-0489 00 KAIG3-RFI-PC-E-0489-00
KAIG3-RFI-PC-E-0488 00 KAIG3-RFI-PC-E-0488-00
KAIG3-RFI-WG-LS-1409 00 KAIG3-RFI-WG-LS-1409-00
KAIG3-RFI-WG-LS-1408 00 KAIG3-RFI-WG-LS-1408-00
KAIG3-RFI-WG-LS-1407 00 KAIG3-RFI-WG-LS-1407-00
KAIG3-RFI-WG-LS-1406 00 KAIG3-RFI-WG-LS-1406-00
KAIG3-RFI-MB-A-0903 00 KAIG3-RFI-MB-A-0903-00
KAIG3-RFI-MB-A-0902 00 KAIG3-RFI-MB-A-0902-00
KAIG3-RFI-MB-A-0901 00 KAIG3-RFI-MB-A-0901-00
KAIG3-RFI-MB-A-0900 00 KAIG3-RFI-MB-A-0900-00
KAIG3-RFI-MB-A-0899 00 KAIG3-RFI-MB-A-0899-00
KAIG3-RFI-TT-A-0898 00 KAIG3-RFI-TT-A-0898-00
KAIG3-RFI-EC-C-5764 00 KAIG3-RFI-EC-C-5764-00
KAIG3-RFI-EC-C-5763 00 KAIG3-RFI-EC-C-5763-00
KAIG3-RFI-EC-C-5762 00 KAIG3-RFI-EC-C-5762-00
KAIG3-RFI-EC-C-5761 00 KAIG3-RFI-EC-C-5761-00
KAIG3-RFI-SM-S-7828 00 KAIG3-RFI-SM-S-7828-00
KAIG3-RFI-SM-S-7827 00 KAIG3-RFI-SM-S-7827-00
KAIG3-RFI-SM-SU-2625 00 KAIG3-RFI-SM-SU-2625-00
KAIG3-RFI-SM-S-7826 00 KAIG3-RFI-SM-S-7826-00
KAIG3-RFI-CO-S-7814 00 KAIG3-RFI-CO-S-7814-00
KAIG3-RFI-CO-S-7815 00 KAIG3-RFI-CO-S-7815-00
KAIG3-RFI-MC-S-7816 00 KAIG3-RFI-MC-S-7816-00
KAIG3-RFI-PC-S-7813 00 KAIG3-RFI-PC-S-7813-00
KAIG3-RFI-MC-C-5776 00 KAIG3-RFI-MC-C-5776-00
KAIG3-RFI-PC-SU-2624 00 KAIG3-RFI-PC-SU-2624-00
KAIG3-RFI-PC-S-7824 00 KAIG3-RFI-PC-S-7824-00
KAIG3-RFI-PC-S-7823 00 KAIG3-RFI-PC-S-7823-00
KAIG3-RFI-NG-SU-2623 00 KAIG3-RFI-NG-SU-2623-00
KAIG3-RFI-CO-S-7811 00 KAIG3-RFI-CO-S-7811-00
KAIG3-RFI-CO-S-7810 00 KAIG3-RFI-CO-S-7810-00
KAIG3-RFI-CO-SU-2618 00 KAIG3-RFI-CO-SU-2618-00
KAIG3-RFI-CO-S-7809 00 KAIG3-RFI-CO-S-7809-00
KAIG3-RFI-CO-S-7808 00 KAIG3-RFI-CO-S-7808-00
KAIG3-RFI-CF-S-7743 00 KAIG3-RFI-CF-S-7743-00
KAIG3-RFI-PC-E-0470-00 01 KAIG3-RFI-PC-E-0470-00-01
KAIG3-RFI-ZG-E-0463 01 KAIG3-RFI-ZG-E-0463-01
KAIG3-RFI-ZG-LC-0601 01 KAIG3-RFI-ZG-LC-0601-01
KAIG3-RFI-ZG-LC-0602 01 KAIG3-RFI-ZG-LC-0602-01
KAIG3-RFI-PC-S-7806 00 KAIG3-RFI-PC-S-7806-00
KAIG3-RFI-PC-SU-2617 00 KAIG3-RFI-PC-SU-2617-00
KAIG3-RFI-SM-SU-2616 00 KAIG3-RFI-SM-SU-2616-00
KAIG3-RFI-SM-S-7804 00 KAIG3-RFI-SM-S-7804-00
KAIG3-RFI-SM-S-7805 00 KAIG3-RFI-SM-S-7805-00
KAIG3-RFI-CO-S-7802 00 KAIG3-RFI-CO-S-7802-00
KAIG3-RFI-CO-SS-0262 01 KAIG3-RFI-CO-SS-0262-01
KAIG3-RFI-CO-SS-0265 01 KAIG3-RFI-CO-SS-0265-01
KAIG3-RFI-CO-SS-0263 01 KAIG3-RFI-CO-SS-0263-01
KAIG3-RFI-MC-C-5753 00 KAIG3-RFI-MC-C-5753-00
KAIG3-RFI-CO-S-7799 00 KAIG3-RFI-CO-S-7799-00
KAIG3-RFI-CF-SU-2614 00 KAIG3-RFI-CF-SU-2614-00
KAIG3-RFI-CF-S-7797 00 KAIG3-RFI-CF-S-7797-00
KAIG3-RFI-CF-S-7796 00 KAIG3-RFI-CF-S-7796-00
KAIG3-RFI-CO-SU-2615 00 KAIG3-RFI-CO-SU-2615-00
KAIG3-RFI-CO-S-7801 00 KAIG3-RFI-CO-S-7801-00
KAIG3-RFI-CO-S-7800 00 KAIG3-RFI-CO-S-7800-00
KAIG3-RFI-MC-C-5752 00 KAIG3-RFI-MC-C-5752-00
KAIG3-RFI-SW-C-5760 00 KAIG3-RFI-SW-C-5760-00
KAIG3-RFI-MC-S-7803 00 KAIG3-RFI-MC-S-7803-00
KAIG3-RFI-SW-C-5759 00 KAIG3-RFI-SW-C-5759-00
KAIG3-RFI-SW-C-5758 00 KAIG3-RFI-SW-C-5758-00
KAIG3-RFI-SW-C-5757 00 KAIG3-RFI-SW-C-5757-00
KAIG3-RFI-SW-C-5756 00 KAIG3-RFI-SW-C-5756-00
KAIG3-RFI-SW-C-5755 00 KAIG3-RFI-SW-C-5755-00
KAIG3-RFI-SW-C-5754 00 KAIG3-RFI-SW-C-5754-00
KAIG3-RFI-AV-A-0897 00 KAIG3-RFI-AV-A-0897-00
KAIG3-RFI-CO-A-0896 00 KAIG3-RFI-CO-A-0896-00
KAIG3-RFI-NR-LC-0646 00 KAIG3-RFI-NR-LC-0646-00
KAIG3-RFI-PG-LC-0645 00 KAIG3-RFI-PG-LC-0645-00
KAIG3-RFI-MB-E-0487 00 KAIG3-RFI-MB-E-0487-00
KAIG3-RFI-TG-SU-2611 00 KAIG3-RFI-TG-SU-2611-00
KAIG3-RFI-TG-C-5749 00 KAIG3-RFI-TG-C-5749-00
KAIG3-RFI-WG-C-5748 00 KAIG3-RFI-WG-C-5748-00
KAIG3-RFI-PG-E-0485 00 KAIG3-RFI-PG-E-0485-00
KAIG3-RFI-WG-C-5747 00 KAIG3-RFI-WG-C-5747-00
KAIG3-RFI-WG-C-5746 00 KAIG3-RFI-WG-C-5746-00
KAIG3-RFI-PC-E-0484 00 KAIG3-RFI-PC-E-0484-00
KAIG3-RFI-SW-S-7624 01 KAIG3-RFI-SW-S-7624-01
KAIG3-RFI-ZG-S-7623 01 KAIG3-RFI-ZG-S-7623-01
KAIG3-RFI-PC-E-0483 00 KAIG3-RFI-PC-E-0483-00
KAIG3-RFI-WG-S-7793 00 KAIG3-RFI-WG-S-7793-00
KAIG3-RFI-PC-E-0482 00 KAIG3-RFI-PC-E-0482-00
KAIG3-RFI-WG-S-7792 00 KAIG3-RFI-WG-S-7792-00
KAIG3-RFI-WG-S-7791 00 KAIG3-RFI-WG-S-7791-00
KAIG3-RFI-WG-S-7790 00 KAIG3-RFI-WG-S-7790-00
KAIG3-RFI-PC-E-0481 00 KAIG3-RFI-PC-E-0481-00
KAIG3-RFI-TG-S-7789 00 KAIG3-RFI-TG-S-7789-00
KAIG3-RFI-EC-S-7788 00 KAIG3-RFI-EC-S-7788-00
KAIG3-RFI-WG-LS-1405 00 KAIG3-RFI-WG-LS-1405-00
KAIG3-RFI-WG-LS-1404 00 KAIG3-RFI-WG-LS-1404-00
KAIG3-RFI-WG-LS-1403 00 KAIG3-RFI-WG-LS-1403-00
KAIG3-RFI-WG-LS-1402 00 KAIG3-RFI-WG-LS-1402-00
KAIG3-RFI-SW-A-0819 01 KAIG3-RFI-SW-A-0819-01
KAIG3-RFI-LM-SU-2610 00 KAIG3-RFI-LM-SU-2610-00
KAIG3-RFI-CO-SU-2613 00 KAIG3-RFI-CO-SU-2613-00
KAIG3-RFI-CO-SU-2612 00 KAIG3-RFI-CO-SU-2612-00
KAIG3-RFI-CO-SS-0283 00 KAIG3-RFI-CO-SS-0283-00
KAIG3-RFI-CO-SS-0284 00 KAIG3-RFI-CO-SS-0284-00
KAIG3-RFI-LM-S-7786 00 KAIG3-RFI-LM-S-7786-00
KAIG3-RFI-LM-S-7785 00 KAIG3-RFI-LM-S-7785-00
KAIG3-RFI-LM-S-7784 00 KAIG3-RFI-LM-S-7784-00
KAIG3-RFI-CO-S-7794 00 KAIG3-RFI-CO-S-7794-00
KAIG3-RFI-CO-S-7795 00 KAIG3-RFI-CO-S-7795-00
KAIG3-RFI-CF-S-7741 00 KAIG3-RFI-CF-S-7741-00
KAIG3-RFI-PC-S-7756 00 KAIG3-RFI-PC-S-7756-00
KAIG3-RFI-CO-S-7787 00 KAIG3-RFI-CO-S-7787-00
KAIG3-RFI-MC-C-5736 00 KAIG3-RFI-MC-C-5736-00
KAIG3-RFI-MC-C-5735 00 KAIG3-RFI-MC-C-5735-00
KAIG3-RFI-EC-SU-2590 00 KAIG3-RFI-EC-SU-2590-00
KAIG3-RFI-WG-C-5734 00 KAIG3-RFI-WG-C-5734-00
KAIG3-RFI-WG-C-5732 00 KAIG3-RFI-WG-C-5732-00
KAIG3-RFI-WG-C-5733 00 KAIG3-RFI-WG-C-5733-00
KAIG3-RFI-DG-C-5731 00 KAIG3-RFI-DG-C-5731-00
KAIG3-RFI-DG-C-5730 00 KAIG3-RFI-DG-C-5730-00
KAIG3-RFI-EC-C-5729 00 KAIG3-RFI-EC-C-5729-00
KAIG3-RFI-EC-C-5728 00 KAIG3-RFI-EC-C-5728-00
KAIG3-RFI-EC-C-5727 00 KAIG3-RFI-EC-C-5727-00
KAIG3-RFI-EC-C-5726 00 KAIG3-RFI-EC-C-5726-00
KAIG3-RFI-EC-S-7730 00 KAIG3-RFI-EC-S-7730-00
KAIG3-RFI-ZG-S-7771 00 KAIG3-RFI-ZG-S-7771-00
KAIG3-RFI-PG-S-7770 00 KAIG3-RFI-PG-S-7770-00
KAIG3-RFI-MB-A-0859 01 KAIG3-RFI-MB-A-0859-01
KAIG3-RFI-MB-A-0893 00 KAIG3-RFI-MB-A-0893-00
KAIG3-RFI-MB-A-0892 00 KAIG3-RFI-MB-A-0892-00
KAIG3-RFI-PA-C-5751 00 KAIG3-RFI-PA-C-5751-00
KAIG3-RFI-PA-C-5750 00 KAIG3-RFI-PA-C-5750-00
KAIG3-RFI-SW-C-5745 00 KAIG3-RFI-SW-C-5745-00
KAIG3-RFI-SW-C-5744 00 KAIG3-RFI-SW-C-5744-00
KAIG3-RFI-SW-C-5743 00 KAIG3-RFI-SW-C-5743-00
KAIG3-RFI-SW-C-5742 00 KAIG3-RFI-SW-C-5742-00
KAIG3-RFI-SW-C-5741 00 KAIG3-RFI-SW-C-5741-00
KAIG3-RFI-SW-C-5740 00 KAIG3-RFI-SW-C-5740-00
KAIG3-RFI-SW-C-5739 00 KAIG3-RFI-SW-C-5739-00
KAIG3-RFI-SW-C-5738 00 KAIG3-RFI-SW-C-5738-00
KAIG3-RFI-SW-C-5737 00 KAIG3-RFI-SW-C-5737-00
KAIG3-RFI-SW-C-5724 00 KAIG3-RFI-SW-C-5724-00
KAIG3-RFI-PA-SS-0301 00 KAIG3-RFI-PA-SS-0301-00
KAIG3-RFI-SW-C-5626 01 KAIG3-RFI-SW-C-5626-01
KAIG3-RFI-PG-A-0891 00 KAIG3-RFI-PG-A-0891-00
KAIG3-RFI-CO-SS-0278 00 KAIG3-RFI-CO-SS-0278-00
KAIG3-RFI-CO-SS-0277 00 KAIG3-RFI-CO-SS-0277-00
KAIG3-RFI-VA-S-7444 00 KAIG3-RFI-VA-S-7444-00
KAIG3-RFI-PG-SS-0243 01 KAIG3-RFI-PG-SS-0243-01
KAIG3-RFI-SW-C-5723 00 KAIG3-RFI-SW-C-5723-00
KAIG3-RFI-SW-C-5722 00 KAIG3-RFI-SW-C-5722-00
KAIG3-RFI-SW-C-5721 00 KAIG3-RFI-SW-C-5721-00
KAIG3-RFI-SW-C-5720 00 KAIG3-RFI-SW-C-5720-00
KAIG3-RFI-SW-C-5719 00 KAIG3-RFI-SW-C-5719-00
KAIG3-RFI-SW-C-5718 00 KAIG3-RFI-SW-C-5718-00
KAIG3-RFI-SW-C-5717 00 KAIG3-RFI-SW-C-5717-00
KAIG3-RFI-SW-C-5496 00 KAIG3-RFI-SW-C-5496-00
KAIG3-RFI-CO-A-0894 00 KAIG3-RFI-CO-A-0894-00
KAIG3-RFI-WG-C-5711 00 KAIG3-RFI-WG-C-5711-00
KAIG3-RFI-WG-C-5710 00 KAIG3-RFI-WG-C-5710-00
KAIG3-RFI-WG-C-5709 00 KAIG3-RFI-WG-C-5709-00
KAIG3-RFI-WG-C-5708 00 KAIG3-RFI-WG-C-5708-00
KAIG3-RFI-WG-C-5707 00 KAIG3-RFI-WG-C-5707-00
KAIG3-RFI-EC-SU-2596 00 KAIG3-RFI-EC-SU-2596-00
KAIG3-RFI-WG-SU-2595 00 KAIG3-RFI-WG-SU-2595-00
KAIG3-RFI-WG-LS-1401 00 KAIG3-RFI-WG-LS-1401-00
KAIG3-RFI-EC-S-7762 00 KAIG3-RFI-EC-S-7762-00
KAIG3-RFI-WG-S-7761 00 KAIG3-RFI-WG-S-7761-00
KAIG3-RFI-EC-S-7760 00 KAIG3-RFI-EC-S-7760-00
KAIG3-RFI-PG-S-7759 00 KAIG3-RFI-PG-S-7759-00
KAIG3-RFI-CO-SU-2609 00 KAIG3-RFI-CO-SU-2609-00
KAIG3-RFI-CF-SU-2606 00 KAIG3-RFI-CF-SU-2606-00
KAIG3-RFI-CO-SU-2599 00 KAIG3-RFI-CO-SU-2599-00
KAIG3-RFI-MC-SU-2598 00 KAIG3-RFI-MC-SU-2598-00
KAIG3-RFI-PC-SU-2604 00 KAIG3-RFI-PC-SU-2604-00
KAIG3-RFI-CO-SU-2605 00 KAIG3-RFI-CO-SU-2605-00
KAIG3-RFI-CO-SU-2608 00 KAIG3-RFI-CO-SU-2608-00
KAIG3-RFI-CO-SU-2607 00 KAIG3-RFI-CO-SU-2607-00
KAIG3-RFI-CO-SS-0281 00 KAIG3-RFI-CO-SS-0281-00
KAIG3-RFI-CO-SS-0282 00 KAIG3-RFI-CO-SS-0282-00
KAIG3-RFI-CO-SS-0272 00 KAIG3-RFI-CO-SS-0272-00
KAIG3-RFI-CO-SS-0276 00 KAIG3-RFI-CO-SS-0276-00
KAIG3-RFI-CO-S-7781 00 KAIG3-RFI-CO-S-7781-00
KAIG3-RFI-CO-S-7780 00 KAIG3-RFI-CO-S-7780-00
KAIG3-RFI-MC-S-7783 00 KAIG3-RFI-MC-S-7783-00
KAIG3-RFI-CF-S-7775 00 KAIG3-RFI-CF-S-7775-00
KAIG3-RFI-CO-S-7777 00 KAIG3-RFI-CO-S-7777-00
KAIG3-RFI-CO-S-7778 00 KAIG3-RFI-CO-S-7778-00
KAIG3-RFI-CO-S-7773 00 KAIG3-RFI-CO-S-7773-00
KAIG3-RFI-CO-S-7772 00 KAIG3-RFI-CO-S-7772-00
KAIG3-RFI-CO-S-7769 00 KAIG3-RFI-CO-S-7769-00
KAIG3-RFI-CO-S-7768 00 KAIG3-RFI-CO-S-7768-00
KAIG3-RFI-MC-S-7766 00 KAIG3-RFI-MC-S-7766-00
KAIG3-RFI-MC-S-7767 00 KAIG3-RFI-MC-S-7767-00
KAIG3-RFI-MC-C-5716 00 KAIG3-RFI-MC-C-5716-00
KAIG3-RFI-ST-S-7711 00 KAIG3-RFI-ST-S-7711-00
KAIG3-RFI-PC-S-7650 00 KAIG3-RFI-PC-S-7650-00
KAIG3-RFI-MC-C-5696 00 KAIG3-RFI-MC-C-5696-00
KAIG3-RFI-CF-LC-0635 00 KAIG3-RFI-CF-LC-0635-00
KAIG3-RFI-CO-SU-2594 00 KAIG3-RFI-CO-SU-2594-00
KAIG3-RFI-CO-SS-0280 00 KAIG3-RFI-CO-SS-0280-00
KAIG3-RFI-CO-S-7755 00 KAIG3-RFI-CO-S-7755-00
KAIG3-RFI-CO-S-7754 00 KAIG3-RFI-CO-S-7754-00
KAIG3-RFI-CO-S-7752 00 KAIG3-RFI-CO-S-7752-00
KAIG3-RFI-MC-S-7765-00 00 KAIG3-RFI-MC-S-7765-00-00
KAIG3-RFI-CO-S-7751 00 KAIG3-RFI-CO-S-7751-00
KAIG3-RFI-CO-S-7750 00 KAIG3-RFI-CO-S-7750-00
KAIG3-RFI-CO-S-7749 00 KAIG3-RFI-CO-S-7749-00
KAIG3-RFI-CO-S-7739 00 KAIG3-RFI-CO-S-7739-00
KAIG3-RFI-CF-SU-2577 00 KAIG3-RFI-CF-SU-2577-00
KAIG3-RFI-CF-S-7697 00 KAIG3-RFI-CF-S-7697-00
KAIG3-RFI-CO-S-7732 00 KAIG3-RFI-CO-S-7732-00
KAIG3-RFI-CF-S-7695 00 KAIG3-RFI-CF-S-7695-00
KAIG3-RFI-CO-S-7721 00 KAIG3-RFI-CO-S-7721-00
KAIG3-RFI-PC-LC-0644 00 KAIG3-RFI-PC-LC-0644-00
KAIG3-RFI-PC-LC-0626 01 KAIG3-RFI-PC-LC-0626-01
KAIG3-RFI-PC-LC-0643 00 KAIG3-RFI-PC-LC-0643-00
KAIG3-RFI-PC-LC-0622 01 KAIG3-RFI-PC-LC-0622-01
KAIG3-RFI-PC-LC-0642 00 KAIG3-RFI-PC-LC-0642-00
KAIG3-RFI-PC-LC-0641 00 KAIG3-RFI-PC-LC-0641-00
KAIG3-RFI-PC-LC-0640 00 KAIG3-RFI-PC-LC-0640-00
KAIG3-RFI-PG-LC-0639 00 KAIG3-RFI-PG-LC-0639-00
KAIG3-RFI-PG-LC-0638 00 KAIG3-RFI-PG-LC-0638-00
KAIG3-RFI-SW-E-0480 00 KAIG3-RFI-SW-E-0480-00
KAIG3-RFI-CO-S-7682 00 KAIG3-RFI-CO-S-7682-00
KAIG3-RFI-SW-C-5715 00 KAIG3-RFI-SW-C-5715-00
KAIG3-RFI-SW-C-5714 00 KAIG3-RFI-SW-C-5714-00
KAIG3-RFI-SW-C-5713 00 KAIG3-RFI-SW-C-5713-00
KAIG3-RFI-SW-C-5712 00 KAIG3-RFI-SW-C-5712-00
KAIG3-RFI-SW-C-5705 00 KAIG3-RFI-SW-C-5705-00
KAIG3-RFI-SW-C-5704 00 KAIG3-RFI-SW-C-5704-00
KAIG3-RFI-SW-C-5703 00 KAIG3-RFI-SW-C-5703-00
KAIG3-RFI-SW-C-5702 00 KAIG3-RFI-SW-C-5702-00
KAIG3-RFI-SW-C-5701 00 KAIG3-RFI-SW-C-5701-00
KAIG3-RFI-SW-C-5700 00 KAIG3-RFI-SW-C-5700-00
KAIG3-RFI-SW-C-5699 00 KAIG3-RFI-SW-C-5699-00
KAIG3-RFI-SW-C-5698 00 KAIG3-RFI-SW-C-5698-00
KAIG3-RFI-SW-C-5697 00 KAIG3-RFI-SW-C-5697-00
KAIG3-RFI-CO-S-7662 00 KAIG3-RFI-CO-S-7662-00
KAIG3-RFI-CO-S-7657 00 KAIG3-RFI-CO-S-7657-00
KAIG3-RFI-CO-C-5706 00 KAIG3-RFI-CO-C-5706-00
KAIG3-RFI-MC-S-7758 00 KAIG3-RFI-MC-S-7758-00
KAIG3-RFI-CO-S-7757 00 KAIG3-RFI-CO-S-7757-00
KAIG3-RFI-PC-S-7764 00 KAIG3-RFI-PC-S-7764-00
KAIG3-RFI-CF-S-7676 00 KAIG3-RFI-CF-S-7676-00
KAIG3-RFI-CO-SS-0275 00 KAIG3-RFI-CO-SS-0275-00
KAIG3-RFI-CO-SS-0274 00 KAIG3-RFI-CO-SS-0274-00
KAIG3-RFI-CO-S-7604 00 KAIG3-RFI-CO-S-7604-00
KAIG3-RFI-DG-C-5010 02 KAIG3-RFI-DG-C-5010-02
KAIG3-RFI-DG-C-5009 02 KAIG3-RFI-DG-C-5009-02
KAIG3-RFI-PC-LC-0616 01 KAIG3-RFI-PC-LC-0616-01
KAIG3-RFI-SW-LC-0569 01 KAIG3-RFI-SW-LC-0569-01
KAIG3-RFI-SW-LC-0568 01 KAIG3-RFI-SW-LC-0568-01
KAIG3-RFI-TG-C-5687 00 KAIG3-RFI-TG-C-5687-00
KAIG3-RFI-EC-C-5686 00 KAIG3-RFI-EC-C-5686-00
KAIG3-RFI-EC-C-5685 00 KAIG3-RFI-EC-C-5685-00
KAIG3-RFI-TG-C-5684 00 KAIG3-RFI-TG-C-5684-00
KAIG3-RFI-WG-C-5683 00 KAIG3-RFI-WG-C-5683-00
KAIG3-RFI-WG-C-5682 00 KAIG3-RFI-WG-C-5682-00
KAIG3-RFI-WG-C-5681 00 KAIG3-RFI-WG-C-5681-00
KAIG3-RFI-WG-C-5671 00 KAIG3-RFI-WG-C-5671-00
KAIG3-RFI-WG-C-5670 00 KAIG3-RFI-WG-C-5670-00
KAIG3-RFI-WG-C-5669 00 KAIG3-RFI-WG-C-5669-00
KAIG3-RFI-AG-SS-0273 00 KAIG3-RFI-AG-SS-0273-00
KAIG3-RFI-PC-P-0244 00 KAIG3-RFI-PC-P-0244-00
KAIG3-RFI-SW-P-0243 00 KAIG3-RFI-SW-P-0243-00
KAIG3-RFI-SW-P-0242 00 KAIG3-RFI-SW-P-0242-00
KAIG3-RFI-PG-E-0479 00 KAIG3-RFI-PG-E-0479-00
KAIG3-RFI-WG-LS-1400 00 KAIG3-RFI-WG-LS-1400-00
KAIG3-RFI-MB-E-0477 00 KAIG3-RFI-MB-E-0477-00
KAIG3-RFI-PC-E-0476 00 KAIG3-RFI-PC-E-0476-00
KAIG3-RFI-CF-LC-0637 00 KAIG3-RFI-CF-LC-0637-00
KAIG3-RFI-CF-LC-0636 00 KAIG3-RFI-CF-LC-0636-00
KAIG3-RFI-MB-LC-0634 00 KAIG3-RFI-MB-LC-0634-00
KAIG3-RFI-MB-LC-0633 00 KAIG3-RFI-MB-LC-0633-00
KAIG3-RFI-TG-C-5668 00 KAIG3-RFI-TG-C-5668-00
KAIG3-RFI-TG-C-5650 00 KAIG3-RFI-TG-C-5650-00
KAIG3-RFI-TG-S-7374 01 KAIG3-RFI-TG-S-7374-01
KAIG3-RFI-PG-S-7729 00 KAIG3-RFI-PG-S-7729-00
KAIG3-RFI-WG-S-7728 00 KAIG3-RFI-WG-S-7728-00
KAIG3-RFI-TB-S-7727 00 KAIG3-RFI-TB-S-7727-00
KAIG3-RFI-TB-S-7726 00 KAIG3-RFI-TB-S-7726-00
KAIG3-RFI-PG-SU-2587 00 KAIG3-RFI-PG-SU-2587-00
KAIG3-RFI-WG-SU-2586 00 KAIG3-RFI-WG-SU-2586-00
KAIG3-RFI-TB-SU-2585 00 KAIG3-RFI-TB-SU-2585-00
KAIG3-RFI-SW-C-5695 00 KAIG3-RFI-SW-C-5695-00
KAIG3-RFI-SW-C-5694 00 KAIG3-RFI-SW-C-5694-00
KAIG3-RFI-PA-C-5693 00 KAIG3-RFI-PA-C-5693-00
KAIG3-RFI-PA-C-5692 00 KAIG3-RFI-PA-C-5692-00
KAIG3-RFI-SW-C-5691 00 KAIG3-RFI-SW-C-5691-00
KAIG3-RFI-SW-C-5690 00 KAIG3-RFI-SW-C-5690-00
KAIG3-RFI-SW-C-5689 00 KAIG3-RFI-SW-C-5689-00
KAIG3-RFI-SW-C-5688 00 KAIG3-RFI-SW-C-5688-00
KAIG3-RFI-SW-C-5680 00 KAIG3-RFI-SW-C-5680-00
KAIG3-RFI-SW-C-5679 00 KAIG3-RFI-SW-C-5679-00
KAIG3-RFI-SW-C-5678 00 KAIG3-RFI-SW-C-5678-00
KAIG3-RFI-SW-C-5677 00 KAIG3-RFI-SW-C-5677-00
KAIG3-RFI-SW-C-5676 00 KAIG3-RFI-SW-C-5676-00
KAIG3-RFI-CF-S-7740 00 KAIG3-RFI-CF-S-7740-00
KAIG3-RFI-PC-SU-2567 00 KAIG3-RFI-PC-SU-2567-00
KAIG3-RFI-CF-SU-2592 00 KAIG3-RFI-CF-SU-2592-00
KAIG3-RFI-CO-SU-2591 00 KAIG3-RFI-CO-SU-2591-00
KAIG3-RFI-CO-S-7746 00 KAIG3-RFI-CO-S-7746-00
KAIG3-RFI-CO-S-7742 00 KAIG3-RFI-CO-S-7742-00
KAIG3-RFI-CO-S-7738 00 KAIG3-RFI-CO-S-7738-00
KAIG3-RFI-CO-S-7736 00 KAIG3-RFI-CO-S-7736-00
KAIG3-RFI-CO-S-7737 00 KAIG3-RFI-CO-S-7737-00
KAIG3-RFI-SW-C-5675 00 KAIG3-RFI-SW-C-5675-00
KAIG3-RFI-SW-C-5674 00 KAIG3-RFI-SW-C-5674-00
KAIG3-RFI-SW-C-5673 00 KAIG3-RFI-SW-C-5673-00
KAIG3-RFI-SW-C-5672 00 KAIG3-RFI-SW-C-5672-00
KAIG3-RFI-PA-SS-0279 00 KAIG3-RFI-PA-SS-0279-00
KAIG3-RFI-SW-C-5332 00 KAIG3-RFI-SW-C-5332-00
KAIG3-RFI-SW-C-5330 00 KAIG3-RFI-SW-C-5330-00
KAIG3-RFI-SW-C-5667 00 KAIG3-RFI-SW-C-5667-00
KAIG3-RFI-SW-C-5666 00 KAIG3-RFI-SW-C-5666-00
KAIG3-RFI-SW-C-5665 00 KAIG3-RFI-SW-C-5665-00
KAIG3-RFI-SW-C-5664 00 KAIG3-RFI-SW-C-5664-00
KAIG3-RFI-SW-C-5663 00 KAIG3-RFI-SW-C-5663-00
KAIG3-RFI-SW-C-5662 00 KAIG3-RFI-SW-C-5662-00
KAIG3-RFI-SW-C-5661 00 KAIG3-RFI-SW-C-5661-00
KAIG3-RFI-SW-C-5660 00 KAIG3-RFI-SW-C-5660-00
KAIG3-RFI-SW-C-5659 00 KAIG3-RFI-SW-C-5659-00
KAIG3-RFI-CO-S-7731 00 KAIG3-RFI-CO-S-7731-00
KAIG3-RFI-CO-SU-2589 00 KAIG3-RFI-CO-SU-2589-00
KAIG3-RFI-CO-S-7733 00 KAIG3-RFI-CO-S-7733-00
KAIG3-RFI-CO-S-7734 00 KAIG3-RFI-CO-S-7734-00
KAIG3-RFI-CO-S-7735 00 KAIG3-RFI-CO-S-7735-00
KAIG3-RFI-CO-SS-0259 01 KAIG3-RFI-CO-SS-0259-01
KAIG3-RFI-CO-SS-0269 00 KAIG3-RFI-CO-SS-0269-00
KAIG3-RFI-AG-SS-0267 00 KAIG3-RFI-AG-SS-0267-00
KAIG3-RFI-CO-SS-0271 00 KAIG3-RFI-CO-SS-0271-00
KAIG3-RFI-CO-SS-0254 01 KAIG3-RFI-CO-SS-0254-01
KAIG3-RFI-MC-S-7725 00 KAIG3-RFI-MC-S-7725-00
KAIG3-RFI-CO-SU-2583 00 KAIG3-RFI-CO-SU-2583-00
KAIG3-RFI-CO-S-7720 00 KAIG3-RFI-CO-S-7720-00
KAIG3-RFI-LM-S-7724 00 KAIG3-RFI-LM-S-7724-00
KAIG3-RFI-LM-S-7723 00 KAIG3-RFI-LM-S-7723-00
KAIG3-RFI-LM-SU-2584 00 KAIG3-RFI-LM-SU-2584-00
KAIG3-RFI-LM-S-7722 00 KAIG3-RFI-LM-S-7722-00
KAIG3-RFI-CO-S-7719 00 KAIG3-RFI-CO-S-7719-00
KAIG3-RFI-CO-S-7718 00 KAIG3-RFI-CO-S-7718-00
KAIG3-RFI-MC-S-7714 00 KAIG3-RFI-MC-S-7714-00
KAIG3-RFI-MC-S-7716 00 KAIG3-RFI-MC-S-7716-00
KAIG3-RFI-MC-S-7717 00 KAIG3-RFI-MC-S-7717-00
KAIG3-RFI-CO-SS-0250 01 KAIG3-RFI-CO-SS-0250-01
KAIG3-RFI-CO-SS-0200 01 KAIG3-RFI-CO-SS-0200-01
KAIG3-RFI-CO-SS-0255 01 KAIG3-RFI-CO-SS-0255-01
KAIG3-RFI-CO-SU-2588 00 KAIG3-RFI-CO-SU-2588-00
KAIG3-RFI-CO-A-0847 01 KAIG3-RFI-CO-A-0847-01
KAIG3-RFI-CO-A-0846 01 KAIG3-RFI-CO-A-0846-01
KAIG3-RFI-CO-A-0845 01 KAIG3-RFI-CO-A-0845-01
KAIG3-RFI-CO-A-0844 01 KAIG3-RFI-CO-A-0844-01
KAIG3-RFI-CO-A-0843 01 KAIG3-RFI-CO-A-0843-01
KAIG3-RFI-CO-A-0842 01 KAIG3-RFI-CO-A-0842-01
KAIG3-RFI-CO-SU-2581 00 KAIG3-RFI-CO-SU-2581-00
KAIG3-RFI-MC-SU-2582 00 KAIG3-RFI-MC-SU-2582-00
KAIG3-RFI-MC-S-7715 00 KAIG3-RFI-MC-S-7715-00
KAIG3-RFI-SW-E-0475 00 KAIG3-RFI-SW-E-0475-00
KAIG3-RFI-CF-LC-0632 00 KAIG3-RFI-CF-LC-0632-00
KAIG3-RFI-CO-A-0839 01 KAIG3-RFI-CO-A-0839-01
KAIG3-RFI-AG-SS-0268 00 KAIG3-RFI-AG-SS-0268-00
KAIG3-RFI-SW-A-0875 01 KAIG3-RFI-SW-A-0875-01
KAIG3-RFI-SW-A-0874 01 KAIG3-RFI-SW-A-0874-01
KAIG3-RFI-SW-A-0873 01 KAIG3-RFI-SW-A-0873-01
KAIG3-RFI-TG-S-7713 00 KAIG3-RFI-TG-S-7713-00
KAIG3-RFI-TG-S-7712 00 KAIG3-RFI-TG-S-7712-00
KAIG3-RFI-WG-S-7700 00 KAIG3-RFI-WG-S-7700-00
KAIG3-RFI-WG-S-7161 01 KAIG3-RFI-WG-S-7161-01
KAIG3-RFI-TG-C-4747 01 KAIG3-RFI-TG-C-4747-01
KAIG3-RFI-WG-C-5433 01 KAIG3-RFI-WG-C-5433-01
KAIG3-RFI-WG-C-5649 00 KAIG3-RFI-WG-C-5649-00
KAIG3-RFI-WG-C-5648 00 KAIG3-RFI-WG-C-5648-00
KAIG3-RFI-WG-C-5647 00 KAIG3-RFI-WG-C-5647-00
KAIG3-RFI-EC-C-5646 00 KAIG3-RFI-EC-C-5646-00
KAIG3-RFI-EC-C-5645 00 KAIG3-RFI-EC-C-5645-00
KAIG3-RFI-EC-C-5644 00 KAIG3-RFI-EC-C-5644-00
KAIG3-RFI-EC-C-5643 00 KAIG3-RFI-EC-C-5643-00
KAIG3-RFI-WG-C-5642 00 KAIG3-RFI-WG-C-5642-00
KAIG3-RFI-WG-P-0241 00 KAIG3-RFI-WG-P-0241-00
KAIG3-RFI-SW-C-5521 01 KAIG3-RFI-SW-C-5521-01
KAIG3-RFI-SW-C-5658 00 KAIG3-RFI-SW-C-5658-00
KAIG3-RFI-SW-C-5657 00 KAIG3-RFI-SW-C-5657-00
KAIG3-RFI-SW-C-5656 00 KAIG3-RFI-SW-C-5656-00
KAIG3-RFI-SW-C-5655 00 KAIG3-RFI-SW-C-5655-00
KAIG3-RFI-SW-C-5654 00 KAIG3-RFI-SW-C-5654-00
KAIG3-RFI-SW-C-5653 00 KAIG3-RFI-SW-C-5653-00
KAIG3-RFI-SW-C-5652 00 KAIG3-RFI-SW-C-5652-00
KAIG3-RFI-PG-S-7691 00 KAIG3-RFI-PG-S-7691-00
KAIG3-RFI-PG-S-7690 00 KAIG3-RFI-PG-S-7690-00
KAIG3-RFI-CF-S-7702 00 KAIG3-RFI-CF-S-7702-00
KAIG3-RFI-MC-S-7701 00 KAIG3-RFI-MC-S-7701-00
KAIG3-RFI-ST-S-7710 00 KAIG3-RFI-ST-S-7710-00
KAIG3-RFI-ST-SU-2580 00 KAIG3-RFI-ST-SU-2580-00
KAIG3-RFI-EC-S-7689 00 KAIG3-RFI-EC-S-7689-00
KAIG3-RFI-ST-S-7709 00 KAIG3-RFI-ST-S-7709-00
KAIG3-RFI-EC-S-7688 00 KAIG3-RFI-EC-S-7688-00
KAIG3-RFI-EC-S-7687 00 KAIG3-RFI-EC-S-7687-00
KAIG3-RFI-CO-S-7705 00 KAIG3-RFI-CO-S-7705-00
KAIG3-RFI-CO-S-7704 00 KAIG3-RFI-CO-S-7704-00
KAIG3-RFI-CO-SU-2578 00 KAIG3-RFI-CO-SU-2578-00
KAIG3-RFI-CO-S-7703 00 KAIG3-RFI-CO-S-7703-00
KAIG3-RFI-CO-SU-2579 00 KAIG3-RFI-CO-SU-2579-00
KAIG3-RFI-CO-S-7706 00 KAIG3-RFI-CO-S-7706-00
KAIG3-RFI-MC-C-5651 00 KAIG3-RFI-MC-C-5651-00
KAIG3-RFI-CO-C-5640 00 KAIG3-RFI-CO-C-5640-00
KAIG3-RFI-CO-C-5641 00 KAIG3-RFI-CO-C-5641-00
KAIG3-RFI-EC-SU-2575 00 KAIG3-RFI-EC-SU-2575-00
KAIG3-RFI-CO-S-7677 00 KAIG3-RFI-CO-S-7677-00
KAIG3-RFI-EC-SU-2574 00 KAIG3-RFI-EC-SU-2574-00
KAIG3-RFI-PG-C-5633 00 KAIG3-RFI-PG-C-5633-00
KAIG3-RFI-EC-C-5632 00 KAIG3-RFI-EC-C-5632-00
KAIG3-RFI-EC-C-5631 00 KAIG3-RFI-EC-C-5631-00
KAIG3-RFI-SW-C-5638 00 KAIG3-RFI-SW-C-5638-00
KAIG3-RFI-SW-C-5637 00 KAIG3-RFI-SW-C-5637-00
KAIG3-RFI-PA-C-5636 00 KAIG3-RFI-PA-C-5636-00
KAIG3-RFI-PA-C-5630 00 KAIG3-RFI-PA-C-5630-00
KAIG3-RFI-SW-C-5629 00 KAIG3-RFI-SW-C-5629-00
KAIG3-RFI-SW-C-5628 00 KAIG3-RFI-SW-C-5628-00
KAIG3-RFI-SW-C-5627 00 KAIG3-RFI-SW-C-5627-00
KAIG3-RFI-SW-C-5626 00 KAIG3-RFI-SW-C-5626-00
KAIG3-RFI-SW-C-5625 00 KAIG3-RFI-SW-C-5625-00
KAIG3-RFI-SW-C-5624 00 KAIG3-RFI-SW-C-5624-00
KAIG3-RFI-SW-C-5623 00 KAIG3-RFI-SW-C-5623-00
KAIG3-RFI-PA-SS-0270 00 KAIG3-RFI-PA-SS-0270-00
KAIG3-RFI-CO-SS-0265 00 KAIG3-RFI-CO-SS-0265-00
KAIG3-RFI-CO-SS-0266 00 KAIG3-RFI-CO-SS-0266-00
KAIG3-RFI-CO-SS-0261 00 KAIG3-RFI-CO-SS-0261-00
KAIG3-RFI-CO-SS-0263 00 KAIG3-RFI-CO-SS-0263-00
KAIG3-RFI-CO-SS-0262 00 KAIG3-RFI-CO-SS-0262-00
KAIG3-RFI-MC-C-5639 00 KAIG3-RFI-MC-C-5639-00
KAIG3-RFI-CO-S-7699 00 KAIG3-RFI-CO-S-7699-00
KAIG3-RFI-PC-S-7698 00 KAIG3-RFI-PC-S-7698-00
KAIG3-RFI-CF-S-7583 00 KAIG3-RFI-CF-S-7583-00
KAIG3-RFI-CF-S-7629 00 KAIG3-RFI-CF-S-7629-00
KAIG3-RFI-LM-SU-2573 00 KAIG3-RFI-LM-SU-2573-00
KAIG3-RFI-LM-SU-2572 00 KAIG3-RFI-LM-SU-2572-00
KAIG3-RFI-LM-S-7685 00 KAIG3-RFI-LM-S-7685-00
KAIG3-RFI-LM-S-7684 00 KAIG3-RFI-LM-S-7684-00
KAIG3-RFI-MC-S-7686 00 KAIG3-RFI-MC-S-7686-00
KAIG3-RFI-CO-S-7692 00 KAIG3-RFI-CO-S-7692-00
KAIG3-RFI-CO-S-7693 00 KAIG3-RFI-CO-S-7693-00
KAIG3-RFI-CO-S-7694 00 KAIG3-RFI-CO-S-7694-00
KAIG3-RFI-CO-SU-2576 00 KAIG3-RFI-CO-SU-2576-00
KAIG3-RFI-LM-S-7584 00 KAIG3-RFI-LM-S-7584-00
KAIG3-RFI-LM-S-7585 00 KAIG3-RFI-LM-S-7585-00
KAIG3-RFI-AG-A-0882 01 KAIG3-RFI-AG-A-0882-01
KAIG3-RFI-PC-SU-2571 00 KAIG3-RFI-PC-SU-2571-00
KAIG3-RFI-CO-SU-5270 00 KAIG3-RFI-CO-SU-5270-00
KAIG3-RFI-SW-C-5634 00 KAIG3-RFI-SW-C-5634-00
KAIG3-RFI-CO-S-7683 00 KAIG3-RFI-CO-S-7683-00
KAIG3-RFI-SW-C-5635 00 KAIG3-RFI-SW-C-5635-00
KAIG3-RFI-CO-S-7681 00 KAIG3-RFI-CO-S-7681-00
KAIG3-RFI-CO-SU-2569 00 KAIG3-RFI-CO-SU-2569-00
KAIG3-RFI-CO-S-7679 00 KAIG3-RFI-CO-S-7679-00
KAIG3-RFI-CO-S-7678 00 KAIG3-RFI-CO-S-7678-00
KAIG3-RFI-MB-LC-0615 00 KAIG3-RFI-MB-LC-0615-00
KAIG3-RFI-MB-LC-0614 00 KAIG3-RFI-MB-LC-0614-00
KAIG3-RFI-PT-LC-0631 00 KAIG3-RFI-PT-LC-0631-00
KAIG3-RFI-PT-LC-0630 00 KAIG3-RFI-PT-LC-0630-00
KAIG3-RFI-SW-LC-0628 00 KAIG3-RFI-SW-LC-0628-00
KAIG3-RFI-SW-LC-0627 00 KAIG3-RFI-SW-LC-0627-00
KAIG3-RFI-PC-LC-0626 00 KAIG3-RFI-PC-LC-0626-00
KAIG3-RFI-PC-LC-0625 00 KAIG3-RFI-PC-LC-0625-00
KAIG3-RFI-PC-LC-0624 00 KAIG3-RFI-PC-LC-0624-00
KAIG3-RFI-PC-LC-0623 00 KAIG3-RFI-PC-LC-0623-00
KAIG3-RFI-PC-LC-0622 00 KAIG3-RFI-PC-LC-0622-00
KAIG3-RFI-PC-LC-0621 00 KAIG3-RFI-PC-LC-0621-00
KAIG3-RFI-SW-E-0474 00 KAIG3-RFI-SW-E-0474-00
KAIG3-RFI-PT-E-0473 00 KAIG3-RFI-PT-E-0473-00
KAIG3-RFI-PC-E-0472 00 KAIG3-RFI-PC-E-0472-00
KAIG3-RFI-TB-E-0471 00 KAIG3-RFI-TB-E-0471-00
KAIG3-RFI-PC-E-0470-00 00 KAIG3-RFI-PC-E-0470-00-00
KAIG3-RFI-WG-LS-1094 01 KAIG3-RFI-WG-LS-1094-01
KAIG3-RFI-TT-A-0890 00 KAIG3-RFI-TT-A-0890-00
KAIG3-RFI-TG-C-5617 00 KAIG3-RFI-TG-C-5617-00
KAIG3-RFI-WG-C-5616 00 KAIG3-RFI-WG-C-5616-00
KAIG3-RFI-WG-C-5604 00 KAIG3-RFI-WG-C-5604-00
KAIG3-RFI-WG-C-5603 00 KAIG3-RFI-WG-C-5603-00
KAIG3-RFI-WG-C-5602 00 KAIG3-RFI-WG-C-5602-00
KAIG3-RFI-EC-C-5601 00 KAIG3-RFI-EC-C-5601-00
KAIG3-RFI-EC-C-5597 00 KAIG3-RFI-EC-C-5597-00
KAIG3-RFI-EC-C-5596 00 KAIG3-RFI-EC-C-5596-00
KAIG3-RFI-EC-C-5595 00 KAIG3-RFI-EC-C-5595-00
KAIG3-RFI-PG-S-7674 00 KAIG3-RFI-PG-S-7674-00
KAIG3-RFI-TB-LC-0629 00 KAIG3-RFI-TB-LC-0629-00
KAIG3-RFI-SW-C-5615 00 KAIG3-RFI-SW-C-5615-00
KAIG3-RFI-SW-C-5614 00 KAIG3-RFI-SW-C-5614-00
KAIG3-RFI-SW-C-5613 00 KAIG3-RFI-SW-C-5613-00
KAIG3-RFI-SW-C-5612 00 KAIG3-RFI-SW-C-5612-00
KAIG3-RFI-SW-C-5611 00 KAIG3-RFI-SW-C-5611-00
KAIG3-RFI-SW-C-5610 00 KAIG3-RFI-SW-C-5610-00
KAIG3-RFI-SW-C-5609 00 KAIG3-RFI-SW-C-5609-00
KAIG3-RFI-SW-C-5608 00 KAIG3-RFI-SW-C-5608-00
KAIG3-RFI-SW-C-5607 00 KAIG3-RFI-SW-C-5607-00
KAIG3-RFI-SW-C-5606 00 KAIG3-RFI-SW-C-5606-00
KAIG3-RFI-CO-SS-0258 00 KAIG3-RFI-CO-SS-0258-00
KAIG3-RFI-CO-SS-0259 00 KAIG3-RFI-CO-SS-0259-00
KAIG3-RFI-CO-SS-0264 00 KAIG3-RFI-CO-SS-0264-00
KAIG3-RFI-CO-C-5598 00 KAIG3-RFI-CO-C-5598-00
KAIG3-RFI-MC-S-7084 01 KAIG3-RFI-MC-S-7084-01
KAIG3-RFI-CO-SU-2565 00 KAIG3-RFI-CO-SU-2565-00
KAIG3-RFI-CO-SU-2566 00 KAIG3-RFI-CO-SU-2566-00
KAIG3-RFI-CF-SU-2568 00 KAIG3-RFI-CF-SU-2568-00
KAIG3-RFI-CG-C-5621 00 KAIG3-RFI-CG-C-5621-00
KAIG3-RFI-JG-C-5620 00 KAIG3-RFI-JG-C-5620-00
KAIG3-RFI-PC-S-7402 00 KAIG3-RFI-PC-S-7402-00
KAIG3-RFI-PC-S-7616 00 KAIG3-RFI-PC-S-7616-00
KAIG3-RFI-CF-S-7675 00 KAIG3-RFI-CF-S-7675-00
KAIG3-RFI-CO-S-7553 00 KAIG3-RFI-CO-S-7553-00
KAIG3-RFI-SW-LS-1399 00 KAIG3-RFI-SW-LS-1399-00
KAIG3-RFI-CF-S-7646 00 KAIG3-RFI-CF-S-7646-00
KAIG3-RFI-ST-S-7541 00 KAIG3-RFI-ST-S-7541-00
KAIG3-RFI-CO-S-7607 00 KAIG3-RFI-CO-S-7607-00
KAIG3-RFI-SW-C-5605 00 KAIG3-RFI-SW-C-5605-00
KAIG3-RFI-SW-C-5619 00 KAIG3-RFI-SW-C-5619-00
KAIG3-RFI-CO-S-7673 00 KAIG3-RFI-CO-S-7673-00
KAIG3-RFI-PC-S-7668 00 KAIG3-RFI-PC-S-7668-00
KAIG3-RFI-CO-S-7671 00 KAIG3-RFI-CO-S-7671-00
KAIG3-RFI-SW-C-5618 00 KAIG3-RFI-SW-C-5618-00
KAIG3-RFI-CO-S-7672 00 KAIG3-RFI-CO-S-7672-00
KAIG3-RFI-PC-S-7666 00 KAIG3-RFI-PC-S-7666-00
KAIG3-RFI-PC-S-7667 00 KAIG3-RFI-PC-S-7667-00
KAIG3-RFI-PC-P-0240 00 KAIG3-RFI-PC-P-0240-00
KAIG3-RFI-CO-S-7635 00 KAIG3-RFI-CO-S-7635-00
KAIG3-RFI-CO-S-7634 00 KAIG3-RFI-CO-S-7634-00
KAIG3-RFI-PC-P-0239 00 KAIG3-RFI-PC-P-0239-00
KAIG3-RFI-CO-S-7633 00 KAIG3-RFI-CO-S-7633-00
KAIG3-RFI-PT-P-0004 01 KAIG3-RFI-PT-P-0004-01
KAIG3-RFI-SW-A-0850 01 KAIG3-RFI-SW-A-0850-01
KAIG3-RFI-SW-A-0864 01 KAIG3-RFI-SW-A-0864-01
KAIG3-RFI-SW-A-0822 01 KAIG3-RFI-SW-A-0822-01
KAIG3-RFI-PG-S-7435 01 KAIG3-RFI-PG-S-7435-01
KAIG3-RFI-MB-A-0889 00 KAIG3-RFI-MB-A-0889-00
KAIG3-RFI-TT-A-0888 00 KAIG3-RFI-TT-A-0888-00
KAIG3-RFI-WG-C-5594 00 KAIG3-RFI-WG-C-5594-00
KAIG3-RFI-MC-C-5599 00 KAIG3-RFI-MC-C-5599-00
KAIG3-RFI-WG-C-5593 00 KAIG3-RFI-WG-C-5593-00
KAIG3-RFI-MC-C-5600 00 KAIG3-RFI-MC-C-5600-00
KAIG3-RFI-MC-S-7163 01 KAIG3-RFI-MC-S-7163-01
KAIG3-RFI-TG-C-5591 00 KAIG3-RFI-TG-C-5591-00
KAIG3-RFI-MC-S-7203 01 KAIG3-RFI-MC-S-7203-01
KAIG3-RFI-EC-C-5586 00 KAIG3-RFI-EC-C-5586-00
KAIG3-RFI-MC-S-7240 01 KAIG3-RFI-MC-S-7240-01
KAIG3-RFI-MB-C-5574 00 KAIG3-RFI-MB-C-5574-00
KAIG3-RFI-PC-S-7663 00 KAIG3-RFI-PC-S-7663-00
KAIG3-RFI-CO-S-7664 00 KAIG3-RFI-CO-S-7664-00
KAIG3-RFI-CO-S-7659 00 KAIG3-RFI-CO-S-7659-00
KAIG3-RFI-CF-S-7660 00 KAIG3-RFI-CF-S-7660-00
KAIG3-RFI-SW-LC-0593 00 KAIG3-RFI-SW-LC-0593-00
KAIG3-RFI-SW-LC-0592 00 KAIG3-RFI-SW-LC-0592-00
KAIG3-RFI-CO-S-7661 00 KAIG3-RFI-CO-S-7661-00
KAIG3-RFI-CO-S-7067 01 KAIG3-RFI-CO-S-7067-01
KAIG3-RFI-MC-S-7501 00 KAIG3-RFI-MC-S-7501-00
KAIG3-RFI-MC-S-7615 00 KAIG3-RFI-MC-S-7615-00
KAIG3-RFI-CO-S-7131 00 KAIG3-RFI-CO-S-7131-00
KAIG3-RFI-CO-S-7037 00 KAIG3-RFI-CO-S-7037-00
KAIG3-RFI-CO-S-7653 00 KAIG3-RFI-CO-S-7653-00
KAIG3-RFI-CO-S-7652 00 KAIG3-RFI-CO-S-7652-00
KAIG3-RFI-CO-S-7077 00 KAIG3-RFI-CO-S-7077-00
KAIG3-RFI-CO-S-7219 00 KAIG3-RFI-CO-S-7219-00
KAIG3-RFI-CO-S-7328 00 KAIG3-RFI-CO-S-7328-00
KAIG3-RFI-CO-S-7341 00 KAIG3-RFI-CO-S-7341-00
KAIG3-RFI-CO-SU-2563 00 KAIG3-RFI-CO-SU-2563-00
KAIG3-RFI-CO-SU-2564 00 KAIG3-RFI-CO-SU-2564-00
KAIG3-RFI-CO-S-7658 00 KAIG3-RFI-CO-S-7658-00
KAIG3-RFI-CO-S-7656 00 KAIG3-RFI-CO-S-7656-00
KAIG3-RFI-CO-S-7654 00 KAIG3-RFI-CO-S-7654-00
KAIG3-RFI-CO-SU-2493 00 KAIG3-RFI-CO-SU-2493-00
KAIG3-RFI-CO-C-5563 00 KAIG3-RFI-CO-C-5563-00
KAIG3-RFI-CO-SS-0256 00 KAIG3-RFI-CO-SS-0256-00
KAIG3-RFI-CO-SS-0257 00 KAIG3-RFI-CO-SS-0257-00
KAIG3-RFI-CO-C-5533 00 KAIG3-RFI-CO-C-5533-00
KAIG3-RFI-CO-C-5532 00 KAIG3-RFI-CO-C-5532-00
KAIG3-RFI-SW-C-5590 00 KAIG3-RFI-SW-C-5590-00
KAIG3-RFI-SW-C-5589 00 KAIG3-RFI-SW-C-5589-00
KAIG3-RFI-SW-C-5588 00 KAIG3-RFI-SW-C-5588-00
KAIG3-RFI-SW-C-5587 00 KAIG3-RFI-SW-C-5587-00
KAIG3-RFI-SW-C-5584 00 KAIG3-RFI-SW-C-5584-00
KAIG3-RFI-SW-C-5583 00 KAIG3-RFI-SW-C-5583-00
KAIG3-RFI-MB-P-0188 02 KAIG3-RFI-MB-P-0188-02
KAIG3-RFI-SW-LS-1398 00 KAIG3-RFI-SW-LS-1398-00
KAIG3-RFI-SW-LS-1397 00 KAIG3-RFI-SW-LS-1397-00
KAIG3-RFI-SW-LS-1396 00 KAIG3-RFI-SW-LS-1396-00
KAIG3-RFI-SW-LS-1395 00 KAIG3-RFI-SW-LS-1395-00
KAIG3-RFI-TG-C-5592 00 KAIG3-RFI-TG-C-5592-00
KAIG3-RFI-MB-S-7651 00 KAIG3-RFI-MB-S-7651-00
KAIG3-RFI-SW-C-5582 00 KAIG3-RFI-SW-C-5582-00
KAIG3-RFI-SW-C-5581 00 KAIG3-RFI-SW-C-5581-00
KAIG3-RFI-SW-C-5580 00 KAIG3-RFI-SW-C-5580-00
KAIG3-RFI-SW-C-5579 00 KAIG3-RFI-SW-C-5579-00
KAIG3-RFI-SW-C-5578 00 KAIG3-RFI-SW-C-5578-00
KAIG3-RFI-SW-C-5577 00 KAIG3-RFI-SW-C-5577-00
KAIG3-RFI-ZG-LC-0602 00 KAIG3-RFI-ZG-LC-0602-00
KAIG3-RFI-ZG-LC-0601 00 KAIG3-RFI-ZG-LC-0601-00
KAIG3-RFI-MB-A-0887 00 KAIG3-RFI-MB-A-0887-00
KAIG3-RFI-SW-A-0820 00 KAIG3-RFI-SW-A-0820-00
KAIG3-RFI-SW-A-0819 00 KAIG3-RFI-SW-A-0819-00
KAIG3-RFI-SW-A-0818 00 KAIG3-RFI-SW-A-0818-00
KAIG3-RFI-MB-S-7638 00 KAIG3-RFI-MB-S-7638-00
KAIG3-RFI-EC-C-5573 00 KAIG3-RFI-EC-C-5573-00
KAIG3-RFI-EC-C-5572 00 KAIG3-RFI-EC-C-5572-00
KAIG3-RFI-GN-A-0886 00 KAIG3-RFI-GN-A-0886-00
KAIG3-RFI-GN-A-0883 00 KAIG3-RFI-GN-A-0883-00
KAIG3-RFI-GN-A-0884 00 KAIG3-RFI-GN-A-0884-00
KAIG3-RFI-GN-A-0885 00 KAIG3-RFI-GN-A-0885-00
KAIG3-RFI-MB-E-0469 00 KAIG3-RFI-MB-E-0469-00
KAIG3-RFI-MB-E-0445 01 KAIG3-RFI-MB-E-0445-01
KAIG3-RFI-PC-LC-0616 00 KAIG3-RFI-PC-LC-0616-00
KAIG3-RFI-MB-LC-0313 02 KAIG3-RFI-MB-LC-0313-02
KAIG3-RFI-CF-LC-0613 00 KAIG3-RFI-CF-LC-0613-00
KAIG3-RFI-CF-LC-0612 00 KAIG3-RFI-CF-LC-0612-00
KAIG3-RFI-CF-LC-0611 00 KAIG3-RFI-CF-LC-0611-00
KAIG3-RFI-PC-LC-0610 00 KAIG3-RFI-PC-LC-0610-00
KAIG3-RFI-PC-LC-0609 00 KAIG3-RFI-PC-LC-0609-00
KAIG3-RFI-PC-LC-0608 00 KAIG3-RFI-PC-LC-0608-00
KAIG3-RFI-PC-LC-0607 00 KAIG3-RFI-PC-LC-0607-00
KAIG3-RFI-SW-LS-1394 00 KAIG3-RFI-SW-LS-1394-00
KAIG3-RFI-WG-P-0238 00 KAIG3-RFI-WG-P-0238-00
KAIG3-RFI-TG-P-0237 00 KAIG3-RFI-TG-P-0237-00
KAIG3-RFI-PA-C-5576 00 KAIG3-RFI-PA-C-5576-00
KAIG3-RFI-PA-C-5575 00 KAIG3-RFI-PA-C-5575-00
KAIG3-RFI-SW-C-5571 00 KAIG3-RFI-SW-C-5571-00
KAIG3-RFI-SW-C-5570 00 KAIG3-RFI-SW-C-5570-00
KAIG3-RFI-SW-C-5569 00 KAIG3-RFI-SW-C-5569-00
KAIG3-RFI-SW-C-5568 00 KAIG3-RFI-SW-C-5568-00
KAIG3-RFI-SW-C-5567 00 KAIG3-RFI-SW-C-5567-00
KAIG3-RFI-SW-C-5566 00 KAIG3-RFI-SW-C-5566-00
KAIG3-RFI-SW-C-5565 00 KAIG3-RFI-SW-C-5565-00
KAIG3-RFI-SW-C-5562 00 KAIG3-RFI-SW-C-5562-00
KAIG3-RFI-PA-SS-0260 00 KAIG3-RFI-PA-SS-0260-00
KAIG3-RFI-CO-SS-0251 00 KAIG3-RFI-CO-SS-0251-00
KAIG3-RFI-CO-SS-0250 00 KAIG3-RFI-CO-SS-0250-00
KAIG3-RFI-CO-SS-0249 00 KAIG3-RFI-CO-SS-0249-00
KAIG3-RFI-CO-SS-0248 00 KAIG3-RFI-CO-SS-0248-00
KAIG3-RFI-PC-SU-2552 00 KAIG3-RFI-PC-SU-2552-00
KAIG3-RFI-MC-SU-2551 00 KAIG3-RFI-MC-SU-2551-00
KAIG3-RFI-MC-S-7614 00 KAIG3-RFI-MC-S-7614-00
KAIG3-RFI-CO-S-7618 00 KAIG3-RFI-CO-S-7618-00
KAIG3-RFI-MC-S-7639 00 KAIG3-RFI-MC-S-7639-00
KAIG3-RFI-CO-S-7640 00 KAIG3-RFI-CO-S-7640-00
KAIG3-RFI-CO-S-7641 00 KAIG3-RFI-CO-S-7641-00
KAIG3-RFI-CO-S-7643 00 KAIG3-RFI-CO-S-7643-00
KAIG3-RFI-CO-S-7644 00 KAIG3-RFI-CO-S-7644-00
KAIG3-RFI-CF-S-7645 00 KAIG3-RFI-CF-S-7645-00
KAIG3-RFI-CO-S-7647 00 KAIG3-RFI-CO-S-7647-00
KAIG3-RFI-LM-S-7648 00 KAIG3-RFI-LM-S-7648-00
KAIG3-RFI-PC-S-7649 00 KAIG3-RFI-PC-S-7649-00
KAIG3-RFI-CO-SU-2560 00 KAIG3-RFI-CO-SU-2560-00
KAIG3-RFI-CF-SU-2561 00 KAIG3-RFI-CF-SU-2561-00
KAIG3-RFI-PC-SU-2562 00 KAIG3-RFI-PC-SU-2562-00
KAIG3-RFI-WG-LS-1393 00 KAIG3-RFI-WG-LS-1393-00
KAIG3-RFI-WG-LS-1392 00 KAIG3-RFI-WG-LS-1392-00
KAIG3-RFI-WG-LS-1391 00 KAIG3-RFI-WG-LS-1391-00
KAIG3-RFI-SW-S-7624 00 KAIG3-RFI-SW-S-7624-00
KAIG3-RFI-ZG-S-7623 00 KAIG3-RFI-ZG-S-7623-00
KAIG3-RFI-SW-SU-2559 00 KAIG3-RFI-SW-SU-2559-00
KAIG3-RFI-ZG-SU-2553 00 KAIG3-RFI-ZG-SU-2553-00
KAIG3-RFI-WG-C-5564 00 KAIG3-RFI-WG-C-5564-00
KAIG3-RFI-WG-C-5555 00 KAIG3-RFI-WG-C-5555-00
KAIG3-RFI-WG-C-5554 00 KAIG3-RFI-WG-C-5554-00
KAIG3-RFI-WG-C-5553 00 KAIG3-RFI-WG-C-5553-00
KAIG3-RFI-EC-C-5552 00 KAIG3-RFI-EC-C-5552-00
KAIG3-RFI-WG-C-5551 00 KAIG3-RFI-WG-C-5551-00
KAIG3-RFI-ZG-C-5535 00 KAIG3-RFI-ZG-C-5535-00
KAIG3-RFI-EC-C-5550 00 KAIG3-RFI-EC-C-5550-00
KAIG3-RFI-CO-SS-0217 00 KAIG3-RFI-CO-SS-0217-00
KAIG3-RFI-AG-SS-0244 00 KAIG3-RFI-AG-SS-0244-00
KAIG3-RFI-SW-C-5561 00 KAIG3-RFI-SW-C-5561-00
KAIG3-RFI-SW-C-5560 00 KAIG3-RFI-SW-C-5560-00
KAIG3-RFI-SW-C-5559 00 KAIG3-RFI-SW-C-5559-00
KAIG3-RFI-SW-C-5558 00 KAIG3-RFI-SW-C-5558-00
KAIG3-RFI-SW-C-5557 00 KAIG3-RFI-SW-C-5557-00
KAIG3-RFI-SW-C-5556 00 KAIG3-RFI-SW-C-5556-00
KAIG3-RFI-SW-C-5545 00 KAIG3-RFI-SW-C-5545-00
KAIG3-RFI-SW-C-5544 00 KAIG3-RFI-SW-C-5544-00
KAIG3-RFI-SW-C-5543 00 KAIG3-RFI-SW-C-5543-00
KAIG3-RFI-SW-C-5542 00 KAIG3-RFI-SW-C-5542-00
KAIG3-RFI-MC-C-5547 00 KAIG3-RFI-MC-C-5547-00
KAIG3-RFI-SW-C-5541 00 KAIG3-RFI-SW-C-5541-00
KAIG3-RFI-CO-SS-0255 00 KAIG3-RFI-CO-SS-0255-00
KAIG3-RFI-CO-SS-0254 00 KAIG3-RFI-CO-SS-0254-00
KAIG3-RFI-CO-SS-0253 00 KAIG3-RFI-CO-SS-0253-00
KAIG3-RFI-CO-SS-0252 00 KAIG3-RFI-CO-SS-0252-00
KAIG3-RFI-PC-SU-2521 01 KAIG3-RFI-PC-SU-2521-01
KAIG3-RFI-MC-S-7631 00 KAIG3-RFI-MC-S-7631-00
KAIG3-RFI-MC-S-7632 00 KAIG3-RFI-MC-S-7632-00
KAIG3-RFI-MC-SU-2556 00 KAIG3-RFI-MC-SU-2556-00
KAIG3-RFI-CO-C-5546 00 KAIG3-RFI-CO-C-5546-00
KAIG3-RFI-CO-SU-2559 00 KAIG3-RFI-CO-SU-2559-00
KAIG3-RFI-CF-S-7630 00 KAIG3-RFI-CF-S-7630-00
KAIG3-RFI-CF-SU-2555 00 KAIG3-RFI-CF-SU-2555-00
KAIG3-RFI-SW-C-5540 00 KAIG3-RFI-SW-C-5540-00
KAIG3-RFI-CF-S-7628 00 KAIG3-RFI-CF-S-7628-00
KAIG3-RFI-SW-C-5539 00 KAIG3-RFI-SW-C-5539-00
KAIG3-RFI-SW-C-5538 00 KAIG3-RFI-SW-C-5538-00
KAIG3-RFI-SW-C-4999 01 KAIG3-RFI-SW-C-4999-01
KAIG3-RFI-CO-S-7636 00 KAIG3-RFI-CO-S-7636-00
KAIG3-RFI-CO-S-7637 00 KAIG3-RFI-CO-S-7637-00
KAIG3-RFI-CO-SU-2558 00 KAIG3-RFI-CO-SU-2558-00
KAIG3-RFI-MC-C-5548 00 KAIG3-RFI-MC-C-5548-00
KAIG3-RFI-CO-S-7625 00 KAIG3-RFI-CO-S-7625-00
KAIG3-RFI-CO-SU-2554 00 KAIG3-RFI-CO-SU-2554-00
KAIG3-RFI-CO-S-7626 00 KAIG3-RFI-CO-S-7626-00
KAIG3-RFI-CO-S-7627 00 KAIG3-RFI-CO-S-7627-00
KAIG3-RFI-BG-LS-0199 00 KAIG3-RFI-BG-LS-0199-00
KAIG3-RFI-WG-LS-0198 00 KAIG3-RFI-WG-LS-0198-00
KAIG3-RFI-WG-LS-1390 00 KAIG3-RFI-WG-LS-1390-00
KAIG3-RFI-WG-LS-1389 00 KAIG3-RFI-WG-LS-1389-00
KAIG3-RFI-WG-LS-1388 00 KAIG3-RFI-WG-LS-1388-00
KAIG3-RFI-EC-C-5534 00 KAIG3-RFI-EC-C-5534-00
KAIG3-RFI-WG-C-5468 00 KAIG3-RFI-WG-C-5468-00
KAIG3-RFI-WG-LS-0197 00 KAIG3-RFI-WG-LS-0197-00
KAIG3-RFI-MB-P-0123 00 KAIG3-RFI-MB-P-0123-00
KAIG3-RFI-SW-C-2941 00 KAIG3-RFI-SW-C-2941-00
KAIG3-RFI-SW-C-2384 00 KAIG3-RFI-SW-C-2384-00
KAIG3-RFI-SW-C-2495 00 KAIG3-RFI-SW-C-2495-00
KAIG3-RFI-CO-S-7621 00 KAIG3-RFI-CO-S-7621-00
KAIG3-RFI-CO-S-7620 00 KAIG3-RFI-CO-S-7620-00
KAIG3-RFI-CO-S-7622 00 KAIG3-RFI-CO-S-7622-00
KAIG3-RFI-CF-S-7594 00 KAIG3-RFI-CF-S-7594-00
KAIG3-RFI-CO-S-7554 00 KAIG3-RFI-CO-S-7554-00
KAIG3-RFI-CO-S-7566 00 KAIG3-RFI-CO-S-7566-00
KAIG3-RFI-CO-S-7581 00 KAIG3-RFI-CO-S-7581-00
KAIG3-RFI-CO-S-7595 00 KAIG3-RFI-CO-S-7595-00
KAIG3-RFI-CO-S-7596 00 KAIG3-RFI-CO-S-7596-00
KAIG3-RFI-CO-S-7597 00 KAIG3-RFI-CO-S-7597-00
KAIG3-RFI-CO-S-7598 00 KAIG3-RFI-CO-S-7598-00
KAIG3-RFI-MC-S-7599 00 KAIG3-RFI-MC-S-7599-00
KAIG3-RFI-CO-S-7592 00 KAIG3-RFI-CO-S-7592-00
KAIG3-RFI-CO-S-7593 00 KAIG3-RFI-CO-S-7593-00
KAIG3-RFI-CO-S-7619 00 KAIG3-RFI-CO-S-7619-00
KAIG3-RFI-CO-C-5498 00 KAIG3-RFI-CO-C-5498-00
KAIG3-RFI-RG-C-5511 00 KAIG3-RFI-RG-C-5511-00
KAIG3-RFI-CO-C-5503 00 KAIG3-RFI-CO-C-5503-00
KAIG3-RFI-CO-C-5517 00 KAIG3-RFI-CO-C-5517-00
KAIG3-RFI-CO-C-5531 00 KAIG3-RFI-CO-C-5531-00
KAIG3-RFI-MC-C-5500 00 KAIG3-RFI-MC-C-5500-00
KAIG3-RFI-MC-C-5499 00 KAIG3-RFI-MC-C-5499-00
KAIG3-RFI-MC-C-5501 00 KAIG3-RFI-MC-C-5501-00
KAIG3-RFI-MC-C-5497 00 KAIG3-RFI-MC-C-5497-00
KAIG3-RFI-CO-SU-2550 00 KAIG3-RFI-CO-SU-2550-00
KAIG3-RFI-CO-SU-2549 00 KAIG3-RFI-CO-SU-2549-00
KAIG3-RFI-CO-SU-2548 00 KAIG3-RFI-CO-SU-2548-00
KAIG3-RFI-LM-SU-2547 00 KAIG3-RFI-LM-SU-2547-00
KAIG3-RFI-CF-SU-2545 00 KAIG3-RFI-CF-SU-2545-00
KAIG3-RFI-LM-SU-2546 00 KAIG3-RFI-LM-SU-2546-00
KAIG3-RFI-CO-SS-0245 00 KAIG3-RFI-CO-SS-0245-00
KAIG3-RFI-CO-SS-0247 00 KAIG3-RFI-CO-SS-0247-00
KAIG3-RFI-CO-SS-0246 00 KAIG3-RFI-CO-SS-0246-00
KAIG3-RFI-CO-SS-0186 02 KAIG3-RFI-CO-SS-0186-02
KAIG3-RFI-CO-SS-0172 01 KAIG3-RFI-CO-SS-0172-01
KAIG3-RFI-CO-SS-0173 01 KAIG3-RFI-CO-SS-0173-01
KAIG3-RFI-CO-SS-0166 04 KAIG3-RFI-CO-SS-0166-04
KAIG3-RFI-CO-SS-0175 01 KAIG3-RFI-CO-SS-0175-01
KAIG3-RFI-CO-SS-0176 01 KAIG3-RFI-CO-SS-0176-01
KAIG3-RFI-CO-SS-0242 00 KAIG3-RFI-CO-SS-0242-00
KAIG3-RFI-MB-E-0444 01 KAIG3-RFI-MB-E-0444-01
KAIG3-RFI-PC-E-0466 00 KAIG3-RFI-PC-E-0466-00
KAIG3-RFI-PC-E-0465 00 KAIG3-RFI-PC-E-0465-00
KAIG3-RFI-SW-C-5522 00 KAIG3-RFI-SW-C-5522-00
KAIG3-RFI-PG-P-0236 00 KAIG3-RFI-PG-P-0236-00
KAIG3-RFI-WG-P-0235 00 KAIG3-RFI-WG-P-0235-00
KAIG3-RFI-SW-P-0234 00 KAIG3-RFI-SW-P-0234-00
KAIG3-RFI-SW-P-0233 00 KAIG3-RFI-SW-P-0233-00
KAIG3-RFI-MB-A-0773 01 KAIG3-RFI-MB-A-0773-01
KAIG3-RFI-SW-A-0807 01 KAIG3-RFI-SW-A-0807-01
KAIG3-RFI-TG-S-7260 01 KAIG3-RFI-TG-S-7260-01
KAIG3-RFI-TG-S-7259 01 KAIG3-RFI-TG-S-7259-01
KAIG3-RFI-MB-S-7591 00 KAIG3-RFI-MB-S-7591-00
KAIG3-RFI-MB-S-7590 00 KAIG3-RFI-MB-S-7590-00
KAIG3-RFI-WG-C-5516 00 KAIG3-RFI-WG-C-5516-00
KAIG3-RFI-WG-C-5515 00 KAIG3-RFI-WG-C-5515-00
KAIG3-RFI-WG-C-5514 00 KAIG3-RFI-WG-C-5514-00
KAIG3-RFI-EC-C-5513 00 KAIG3-RFI-EC-C-5513-00
KAIG3-RFI-EC-C-5512 00 KAIG3-RFI-EC-C-5512-00
KAIG3-RFI-SW-C-5531 00 KAIG3-RFI-SW-C-5531-00
KAIG3-RFI-SW-C-5530 00 KAIG3-RFI-SW-C-5530-00
KAIG3-RFI-SW-C-5529 00 KAIG3-RFI-SW-C-5529-00
KAIG3-RFI-SW-C-5528 00 KAIG3-RFI-SW-C-5528-00
KAIG3-RFI-SW-C-5527 00 KAIG3-RFI-SW-C-5527-00
KAIG3-RFI-SW-C-5526 00 KAIG3-RFI-SW-C-5526-00
KAIG3-RFI-SW-C-5525 00 KAIG3-RFI-SW-C-5525-00
KAIG3-RFI-SW-C-5524 00 KAIG3-RFI-SW-C-5524-00
KAIG3-RFI-SW-C-5523 00 KAIG3-RFI-SW-C-5523-00
KAIG3-RFI-SW-C-5410 01 KAIG3-RFI-SW-C-5410-01
KAIG3-RFI-TB-E-0464 00 KAIG3-RFI-TB-E-0464-00
KAIG3-RFI-ZG-E-0463 00 KAIG3-RFI-ZG-E-0463-00
KAIG3-RFI-TB-LC-0606 00 KAIG3-RFI-TB-LC-0606-00
KAIG3-RFI-TB-LC-0605 00 KAIG3-RFI-TB-LC-0605-00
KAIG3-RFI-TB-LC-0604 00 KAIG3-RFI-TB-LC-0604-00
KAIG3-RFI-TB-LC-0603 00 KAIG3-RFI-TB-LC-0603-00
KAIG3-RFI-SW-C-5521 00 KAIG3-RFI-SW-C-5521-00
KAIG3-RFI-SW-C-5520 00 KAIG3-RFI-SW-C-5520-00
KAIG3-RFI-SW-C-5519 00 KAIG3-RFI-SW-C-5519-00
KAIG3-RFI-SW-C-5518 00 KAIG3-RFI-SW-C-5518-00
KAIG3-RFI-SW-C-5510 00 KAIG3-RFI-SW-C-5510-00
KAIG3-RFI-SW-C-5509 00 KAIG3-RFI-SW-C-5509-00
KAIG3-RFI-SW-C-5508 00 KAIG3-RFI-SW-C-5508-00
KAIG3-RFI-SW-C-5507 00 KAIG3-RFI-SW-C-5507-00
KAIG3-RFI-SW-C-5506 00 KAIG3-RFI-SW-C-5506-00
KAIG3-RFI-SW-C-5505 00 KAIG3-RFI-SW-C-5505-00
KAIG3-RFI-SW-C-5504 00 KAIG3-RFI-SW-C-5504-00
KAIG3-RFI-MC-S-7244 01 KAIG3-RFI-MC-S-7244-01
KAIG3-RFI-SW-C-5495 00 KAIG3-RFI-SW-C-5495-00
KAIG3-RFI-SW-C-5494 00 KAIG3-RFI-SW-C-5494-00
KAIG3-RFI-SW-C-5493 00 KAIG3-RFI-SW-C-5493-00
KAIG3-RFI-SW-C-5492 00 KAIG3-RFI-SW-C-5492-00
KAIG3-RFI-SW-C-5491 00 KAIG3-RFI-SW-C-5491-00
KAIG3-RFI-SW-C-5490 00 KAIG3-RFI-SW-C-5490-00
KAIG3-RFI-SW-C-5489 00 KAIG3-RFI-SW-C-5489-00
KAIG3-RFI-SW-C-5488 00 KAIG3-RFI-SW-C-5488-00
KAIG3-RFI-SW-C-5487 00 KAIG3-RFI-SW-C-5487-00
KAIG3-RFI-SW-C-5486 00 KAIG3-RFI-SW-C-5486-00
KAIG3-RFI-SW-C-5485 00 KAIG3-RFI-SW-C-5485-00
KAIG3-RFI-SW-C-5343 01 KAIG3-RFI-SW-C-5343-01
KAIG3-RFI-SW-C-2935 01 KAIG3-RFI-SW-C-2935-01
KAIG3-RFI-PC-S-7354 01 KAIG3-RFI-PC-S-7354-01
KAIG3-RFI-SW-C-2887 01 KAIG3-RFI-SW-C-2887-01
KAIG3-RFI-PC-S-7399 01 KAIG3-RFI-PC-S-7399-01
KAIG3-RFI-CO-S-7474 01 KAIG3-RFI-CO-S-7474-01
KAIG3-RFI-CO-S-6629 02 KAIG3-RFI-CO-S-6629-02
KAIG3-RFI-LM-S-7587 00 KAIG3-RFI-LM-S-7587-00
KAIG3-RFI-TG-S-7144 01 KAIG3-RFI-TG-S-7144-01
KAIG3-RFI-CF-S-7582 00 KAIG3-RFI-CF-S-7582-00
KAIG3-RFI-CO-S-7588 00 KAIG3-RFI-CO-S-7588-00
KAIG3-RFI-TG-S-7142 01 KAIG3-RFI-TG-S-7142-01
KAIG3-RFI-CO-S-7481 00 KAIG3-RFI-CO-S-7481-00
KAIG3-RFI-SM-S-7576 00 KAIG3-RFI-SM-S-7576-00
KAIG3-RFI-MC-S-7579 00 KAIG3-RFI-MC-S-7579-00
KAIG3-RFI-TG-S-6532 01 KAIG3-RFI-TG-S-6532-01
KAIG3-RFI-TG-S-6507 01 KAIG3-RFI-TG-S-6507-01
KAIG3-RFI-TB-S-7578 00 KAIG3-RFI-TB-S-7578-00
KAIG3-RFI-LM-S-7586 00 KAIG3-RFI-LM-S-7586-00
KAIG3-RFI-SW-S-7577 00 KAIG3-RFI-SW-S-7577-00
KAIG3-RFI-CO-S-7589 00 KAIG3-RFI-CO-S-7589-00
KAIG3-RFI-MC-S-7580 00 KAIG3-RFI-MC-S-7580-00
KAIG3-RFI-SW-SU-2544 00 KAIG3-RFI-SW-SU-2544-00
KAIG3-RFI-CF-S-7567 00 KAIG3-RFI-CF-S-7567-00
KAIG3-RFI-CO-S-7575 00 KAIG3-RFI-CO-S-7575-00
KAIG3-RFI-WG-LS-1387 00 KAIG3-RFI-WG-LS-1387-00
KAIG3-RFI-SW-E-0459 00 KAIG3-RFI-SW-E-0459-00
KAIG3-RFI-PC-LC-0600 00 KAIG3-RFI-PC-LC-0600-00
KAIG3-RFI-CF-LC-0599 00 KAIG3-RFI-CF-LC-0599-00
KAIG3-RFI-CF-LC-0598 00 KAIG3-RFI-CF-LC-0598-00
KAIG3-RFI-CF-LC-0597 00 KAIG3-RFI-CF-LC-0597-00
KAIG3-RFI-PT-LC-0585 01 KAIG3-RFI-PT-LC-0585-01
KAIG3-RFI-PT-LC-0584 01 KAIG3-RFI-PT-LC-0584-01
KAIG3-RFI-TT-LC-0596 00 KAIG3-RFI-TT-LC-0596-00
KAIG3-RFI-TT-LC-0595 00 KAIG3-RFI-TT-LC-0595-00
KAIG3-RFI-TT-LC-0594 00 KAIG3-RFI-TT-LC-0594-00
KAIG3-RFI-SW-E-0458 01 KAIG3-RFI-SW-E-0458-01
KAIG3-RFI-SM-E-0462 00 KAIG3-RFI-SM-E-0462-00
KAIG3-RFI-SW-E-0461 00 KAIG3-RFI-SW-E-0461-00
KAIG3-RFI-WG-C-4515 01 KAIG3-RFI-WG-C-4515-01
KAIG3-RFI-PG-A-0881 00 KAIG3-RFI-PG-A-0881-00
KAIG3-RFI-PG-A-0880 00 KAIG3-RFI-PG-A-0880-00
KAIG3-RFI-MB-S-7030 01 KAIG3-RFI-MB-S-7030-01
KAIG3-RFI-PG-S-7563 00 KAIG3-RFI-PG-S-7563-00
KAIG3-RFI-PG-S-7562 00 KAIG3-RFI-PG-S-7562-00
KAIG3-RFI-EC-C-5478 00 KAIG3-RFI-EC-C-5478-00
KAIG3-RFI-EC-C-5477 00 KAIG3-RFI-EC-C-5477-00
KAIG3-RFI-WG-C-5467 00 KAIG3-RFI-WG-C-5467-00
KAIG3-RFI-WG-C-5466 00 KAIG3-RFI-WG-C-5466-00
KAIG3-RFI-WG-C-5465 00 KAIG3-RFI-WG-C-5465-00
KAIG3-RFI-WG-C-5464 00 KAIG3-RFI-WG-C-5464-00
KAIG3-RFI-MC-SU-2543 00 KAIG3-RFI-MC-SU-2543-00
KAIG3-RFI-CO-SS-0239 00 KAIG3-RFI-CO-SS-0239-00
KAIG3-RFI-CO-C-5484 00 KAIG3-RFI-CO-C-5484-00
KAIG3-RFI-MC-C-5479 00 KAIG3-RFI-MC-C-5479-00
KAIG3-RFI-MC-C-5480 00 KAIG3-RFI-MC-C-5480-00
KAIG3-RFI-CO-S-7574 00 KAIG3-RFI-CO-S-7574-00
KAIG3-RFI-LM-S-7571 00 KAIG3-RFI-LM-S-7571-00
KAIG3-RFI-LM-S-7572 00 KAIG3-RFI-LM-S-7572-00
KAIG3-RFI-CO-S-7060 01 KAIG3-RFI-CO-S-7060-01
KAIG3-RFI-MC-S-7568 00 KAIG3-RFI-MC-S-7568-00
KAIG3-RFI-MC-S-7570 00 KAIG3-RFI-MC-S-7570-00
KAIG3-RFI-CO-S-7573 00 KAIG3-RFI-CO-S-7573-00
KAIG3-RFI-SM-S-7494 00 KAIG3-RFI-SM-S-7494-00
KAIG3-RFI-CF-S-7440 00 KAIG3-RFI-CF-S-7440-00
KAIG3-RFI-CF-S-7549 00 KAIG3-RFI-CF-S-7549-00
KAIG3-RFI-CO-S-7373 00 KAIG3-RFI-CO-S-7373-00
KAIG3-RFI-SM-S-7297 01 KAIG3-RFI-SM-S-7297-01
KAIG3-RFI-MC-S-7564 00 KAIG3-RFI-MC-S-7564-00
KAIG3-RFI-MC-S-7565 00 KAIG3-RFI-MC-S-7565-00
KAIG3-RFI-VA-S-7335 00 KAIG3-RFI-VA-S-7335-00
KAIG3-RFI-VA-S-7390 00 KAIG3-RFI-VA-S-7390-00
KAIG3-RFI-AG-A-0882 00 KAIG3-RFI-AG-A-0882-00
KAIG3-RFI-PG-SS-0243 00 KAIG3-RFI-PG-SS-0243-00
KAIG3-RFI-WG-P-0232 00 KAIG3-RFI-WG-P-0232-00
KAIG3-RFI-SW-LS-1380 00 KAIG3-RFI-SW-LS-1380-00
KAIG3-RFI-SW-LS-1386 00 KAIG3-RFI-SW-LS-1386-00
KAIG3-RFI-SW-LS-1385 00 KAIG3-RFI-SW-LS-1385-00
KAIG3-RFI-SW-LS-1384 00 KAIG3-RFI-SW-LS-1384-00
KAIG3-RFI-SW-LS-1383 00 KAIG3-RFI-SW-LS-1383-00
KAIG3-RFI-SW-LS-1382 00 KAIG3-RFI-SW-LS-1382-00
KAIG3-RFI-SW-LS-1381 00 KAIG3-RFI-SW-LS-1381-00
KAIG3-RFI-SW-C-5483 00 KAIG3-RFI-SW-C-5483-00
KAIG3-RFI-SW-C-5482 00 KAIG3-RFI-SW-C-5482-00
KAIG3-RFI-SW-C-5481 00 KAIG3-RFI-SW-C-5481-00
KAIG3-RFI-SW-C-5473 00 KAIG3-RFI-SW-C-5473-00
KAIG3-RFI-SW-C-5472 00 KAIG3-RFI-SW-C-5472-00
KAIG3-RFI-SW-C-5471 00 KAIG3-RFI-SW-C-5471-00
KAIG3-RFI-SW-C-5470 00 KAIG3-RFI-SW-C-5470-00
KAIG3-RFI-SW-C-5469 00 KAIG3-RFI-SW-C-5469-00
KAIG3-RFI-SW-C-5454 00 KAIG3-RFI-SW-C-5454-00
KAIG3-RFI-TG-SS-0146 03 KAIG3-RFI-TG-SS-0146-03
KAIG3-RFI-CO-SS-0237 00 KAIG3-RFI-CO-SS-0237-00
KAIG3-RFI-CO-SS-0238 00 KAIG3-RFI-CO-SS-0238-00
KAIG3-RFI-CO-SS-0236 00 KAIG3-RFI-CO-SS-0236-00
KAIG3-RFI-CO-SS-0232 00 KAIG3-RFI-CO-SS-0232-00
KAIG3-RFI-CO-SS-0235 00 KAIG3-RFI-CO-SS-0235-00
KAIG3-RFI-CO-SS-0240 00 KAIG3-RFI-CO-SS-0240-00
KAIG3-RFI-CO-SS-0241 00 KAIG3-RFI-CO-SS-0241-00
KAIG3-RFI-CO-SS-0300 00 KAIG3-RFI-CO-SS-0300-00
KAIG3-RFI-LM-S-7558 00 KAIG3-RFI-LM-S-7558-00
KAIG3-RFI-LM-S-7557 00 KAIG3-RFI-LM-S-7557-00
KAIG3-RFI-LM-S-7559 00 KAIG3-RFI-LM-S-7559-00
KAIG3-RFI-LM-S-7560 00 KAIG3-RFI-LM-S-7560-00
KAIG3-RFI-LM-S-7561 00 KAIG3-RFI-LM-S-7561-00
KAIG3-RFI-CO-S-7552 00 KAIG3-RFI-CO-S-7552-00
KAIG3-RFI-CO-S-7556 00 KAIG3-RFI-CO-S-7556-00
KAIG3-RFI-CO-S-7551 00 KAIG3-RFI-CO-S-7551-00
KAIG3-RFI-CO-S-7610 00 KAIG3-RFI-CO-S-7610-00
KAIG3-RFI-CO-S-7611 00 KAIG3-RFI-CO-S-7611-00
KAIG3-RFI-CO-S-7609 00 KAIG3-RFI-CO-S-7609-00
KAIG3-RFI-PC-S-7542 00 KAIG3-RFI-PC-S-7542-00
KAIG3-RFI-PC-S-7543 00 KAIG3-RFI-PC-S-7543-00
KAIG3-RFI-CO-S-7612 00 KAIG3-RFI-CO-S-7612-00
KAIG3-RFI-CF-S-7548 00 KAIG3-RFI-CF-S-7548-00
KAIG3-RFI-CO-S-7544 00 KAIG3-RFI-CO-S-7544-00
KAIG3-RFI-SW-C-5453 00 KAIG3-RFI-SW-C-5453-00
KAIG3-RFI-SW-C-5452 00 KAIG3-RFI-SW-C-5452-00
KAIG3-RFI-SW-C-5451 00 KAIG3-RFI-SW-C-5451-00
KAIG3-RFI-SW-C-5450 00 KAIG3-RFI-SW-C-5450-00
KAIG3-RFI-ST-S-7539 00 KAIG3-RFI-ST-S-7539-00
KAIG3-RFI-SW-C-5449 00 KAIG3-RFI-SW-C-5449-00
KAIG3-RFI-ST-S-7540 00 KAIG3-RFI-ST-S-7540-00
KAIG3-RFI-SW-C-5429 00 KAIG3-RFI-SW-C-5429-00
KAIG3-RFI-TG-C-5463 00 KAIG3-RFI-TG-C-5463-00
KAIG3-RFI-PG-C-5461 00 KAIG3-RFI-PG-C-5461-00
KAIG3-RFI-TG-C-5460 00 KAIG3-RFI-TG-C-5460-00
KAIG3-RFI-ZG-S-6839 01 KAIG3-RFI-ZG-S-6839-01
KAIG3-RFI-ZG-S-7555 00 KAIG3-RFI-ZG-S-7555-00
KAIG3-RFI-PG-S-7538 00 KAIG3-RFI-PG-S-7538-00
KAIG3-RFI-TB-SU-2540 00 KAIG3-RFI-TB-SU-2540-00
KAIG3-RFI-PG-SU-2539 00 KAIG3-RFI-PG-SU-2539-00
KAIG3-RFI-LM-SU-2542 00 KAIG3-RFI-LM-SU-2542-00
KAIG3-RFI-CO-SU-2538 00 KAIG3-RFI-CO-SU-2538-00
KAIG3-RFI-LM-SU-2541 00 KAIG3-RFI-LM-SU-2541-00
KAIG3-RFI-CO-SU-2603 00 KAIG3-RFI-CO-SU-2603-00
KAIG3-RFI-PC-SU-2533 00 KAIG3-RFI-PC-SU-2533-00
KAIG3-RFI-CF-SU-2536 00 KAIG3-RFI-CF-SU-2536-00
KAIG3-RFI-ST-SU-2531 00 KAIG3-RFI-ST-SU-2531-00
KAIG3-RFI-CO-SU-2534 00 KAIG3-RFI-CO-SU-2534-00
KAIG3-RFI-ST-SU-2523 00 KAIG3-RFI-ST-SU-2523-00
KAIG3-RFI-MC-SU-2535 00 KAIG3-RFI-MC-SU-2535-00
KAIG3-RFI-CO-SU-2530 00 KAIG3-RFI-CO-SU-2530-00
KAIG3-RFI-MC-SU-2600 00 KAIG3-RFI-MC-SU-2600-00
KAIG3-RFI-CO-SU-2601 00 KAIG3-RFI-CO-SU-2601-00
KAIG3-RFI-CO-SU-2602 00 KAIG3-RFI-CO-SU-2602-00
KAIG3-RFI-CO-SU-2529 00 KAIG3-RFI-CO-SU-2529-00
KAIG3-RFI-LM-SU-2446 01 KAIG3-RFI-LM-SU-2446-01
KAIG3-RFI-CO-C-5428 00 KAIG3-RFI-CO-C-5428-00
KAIG3-RFI-MC-S-7546 00 KAIG3-RFI-MC-S-7546-00
KAIG3-RFI-MC-S-7547 00 KAIG3-RFI-MC-S-7547-00
KAIG3-RFI-VG-C-5440 00 KAIG3-RFI-VG-C-5440-00
KAIG3-RFI-CO-S-7605 00 KAIG3-RFI-CO-S-7605-00
KAIG3-RFI-CO-S-7535 00 KAIG3-RFI-CO-S-7535-00
KAIG3-RFI-MC-S-7600 00 KAIG3-RFI-MC-S-7600-00
KAIG3-RFI-MC-S-7601 00 KAIG3-RFI-MC-S-7601-00
KAIG3-RFI-MC-S-7602 00 KAIG3-RFI-MC-S-7602-00
KAIG3-RFI-CO-S-7603 00 KAIG3-RFI-CO-S-7603-00
KAIG3-RFI-CO-S-7606 00 KAIG3-RFI-CO-S-7606-00
KAIG3-RFI-MC-S-7608 00 KAIG3-RFI-MC-S-7608-00
KAIG3-RFI-LM-S-7261 01 KAIG3-RFI-LM-S-7261-01
KAIG3-RFI-LM-S-7262 01 KAIG3-RFI-LM-S-7262-01
KAIG3-RFI-MC-S-7526 00 KAIG3-RFI-MC-S-7526-00
KAIG3-RFI-MC-S-7527 00 KAIG3-RFI-MC-S-7527-00
KAIG3-RFI-MC-S-7528 00 KAIG3-RFI-MC-S-7528-00
KAIG3-RFI-MC-S-7529 00 KAIG3-RFI-MC-S-7529-00
KAIG3-RFI-MC-S-7530 00 KAIG3-RFI-MC-S-7530-00
KAIG3-RFI-MC-S-7531 00 KAIG3-RFI-MC-S-7531-00
KAIG3-RFI-MC-S-7532 00 KAIG3-RFI-MC-S-7532-00
KAIG3-RFI-CO-S-7533 00 KAIG3-RFI-CO-S-7533-00
KAIG3-RFI-LM-S-7296 01 KAIG3-RFI-LM-S-7296-01
KAIG3-RFI-MB-A-0880 00 KAIG3-RFI-MB-A-0880-00
KAIG3-RFI-MB-A-0879 00 KAIG3-RFI-MB-A-0879-00
KAIG3-RFI-EC-SU-2537 00 KAIG3-RFI-EC-SU-2537-00
KAIG3-RFI-SW-S-7520 00 KAIG3-RFI-SW-S-7520-00
KAIG3-RFI-EC-S-7537 00 KAIG3-RFI-EC-S-7537-00
KAIG3-RFI-CO-S-7534 00 KAIG3-RFI-CO-S-7534-00
KAIG3-RFI-CO-S-6631 02 KAIG3-RFI-CO-S-6631-02
KAIG3-RFI-LM-S-7550 00 KAIG3-RFI-LM-S-7550-00
KAIG3-RFI-TG-C-5445 00 KAIG3-RFI-TG-C-5445-00
KAIG3-RFI-WG-C-5448 00 KAIG3-RFI-WG-C-5448-00
KAIG3-RFI-WG-C-5447 00 KAIG3-RFI-WG-C-5447-00
KAIG3-RFI-WG-C-5446 00 KAIG3-RFI-WG-C-5446-00
KAIG3-RFI-ZG-C-5434 00 KAIG3-RFI-ZG-C-5434-00
KAIG3-RFI-WG-C-5433 00 KAIG3-RFI-WG-C-5433-00
KAIG3-RFI-PG-C-5432 00 KAIG3-RFI-PG-C-5432-00
KAIG3-RFI-EC-C-5431 00 KAIG3-RFI-EC-C-5431-00
KAIG3-RFI-EC-C-5430 00 KAIG3-RFI-EC-C-5430-00
KAIG3-RFI-VG-C-5408 00 KAIG3-RFI-VG-C-5408-00
KAIG3-RFI-CO-SU-2528 00 KAIG3-RFI-CO-SU-2528-00
KAIG3-RFI-CO-SU-2524 00 KAIG3-RFI-CO-SU-2524-00
KAIG3-RFI-SW-C-5459 00 KAIG3-RFI-SW-C-5459-00
KAIG3-RFI-SW-C-5458 00 KAIG3-RFI-SW-C-5458-00
KAIG3-RFI-CO-S-7536 00 KAIG3-RFI-CO-S-7536-00
KAIG3-RFI-SW-C-5457 00 KAIG3-RFI-SW-C-5457-00
KAIG3-RFI-SW-C-5456 00 KAIG3-RFI-SW-C-5456-00
KAIG3-RFI-SW-C-5455 00 KAIG3-RFI-SW-C-5455-00
KAIG3-RFI-SW-C-5444 00 KAIG3-RFI-SW-C-5444-00
KAIG3-RFI-CO-S-7476 00 KAIG3-RFI-CO-S-7476-00
KAIG3-RFI-PC-S-7193 01 KAIG3-RFI-PC-S-7193-01
KAIG3-RFI-SW-C-5443 00 KAIG3-RFI-SW-C-5443-00
KAIG3-RFI-CO-S-7255 01 KAIG3-RFI-CO-S-7255-01
KAIG3-RFI-SW-C-5442 00 KAIG3-RFI-SW-C-5442-00
KAIG3-RFI-SW-C-5441 00 KAIG3-RFI-SW-C-5441-00
KAIG3-RFI-CO-S-7206 01 KAIG3-RFI-CO-S-7206-01
KAIG3-RFI-PC-S-7194 01 KAIG3-RFI-PC-S-7194-01
KAIG3-RFI-PC-S-7196 01 KAIG3-RFI-PC-S-7196-01
KAIG3-RFI-PC-S-7195 01 KAIG3-RFI-PC-S-7195-01
KAIG3-RFI-MC-S-7525 00 KAIG3-RFI-MC-S-7525-00
KAIG3-RFI-CO-S-7329 01 KAIG3-RFI-CO-S-7329-01
KAIG3-RFI-SW-C-5439 00 KAIG3-RFI-SW-C-5439-00
KAIG3-RFI-SW-C-5438 00 KAIG3-RFI-SW-C-5438-00
KAIG3-RFI-SW-C-5437 00 KAIG3-RFI-SW-C-5437-00
KAIG3-RFI-SW-C-5436 00 KAIG3-RFI-SW-C-5436-00
KAIG3-RFI-SW-C-5435 00 KAIG3-RFI-SW-C-5435-00
KAIG3-RFI-SW-C-5425 00 KAIG3-RFI-SW-C-5425-00
KAIG3-RFI-EC-S-7521 00 KAIG3-RFI-EC-S-7521-00
KAIG3-RFI-WG-C-5427 00 KAIG3-RFI-WG-C-5427-00
KAIG3-RFI-TG-C-5426 00 KAIG3-RFI-TG-C-5426-00
KAIG3-RFI-EC-SU-2527 00 KAIG3-RFI-EC-SU-2527-00
KAIG3-RFI-WG-S-7491 00 KAIG3-RFI-WG-S-7491-00
KAIG3-RFI-WG-S-7490 00 KAIG3-RFI-WG-S-7490-00
KAIG3-RFI-TB-S-7519 00 KAIG3-RFI-TB-S-7519-00
KAIG3-RFI-CO-S-7264 01 KAIG3-RFI-CO-S-7264-01
KAIG3-RFI-CO-S-7522 00 KAIG3-RFI-CO-S-7522-00
KAIG3-RFI-CO-S-7523 00 KAIG3-RFI-CO-S-7523-00
KAIG3-RFI-CO-S-7524 00 KAIG3-RFI-CO-S-7524-00
KAIG3-RFI-PC-S-7516 00 KAIG3-RFI-PC-S-7516-00
KAIG3-RFI-SM-E-0460 00 KAIG3-RFI-SM-E-0460-00
KAIG3-RFI-CO-S-7517 00 KAIG3-RFI-CO-S-7517-00
KAIG3-RFI-CO-S-7518 00 KAIG3-RFI-CO-S-7518-00
KAIG3-RFI-CO-SS-0233 00 KAIG3-RFI-CO-SS-0233-00
KAIG3-RFI-SW-P-0231 00 KAIG3-RFI-SW-P-0231-00
KAIG3-RFI-WG-P-0230 00 KAIG3-RFI-WG-P-0230-00
KAIG3-RFI-TB-SU-2518 00 KAIG3-RFI-TB-SU-2518-00
KAIG3-RFI-WG-SU-2389 01 KAIG3-RFI-WG-SU-2389-01
KAIG3-RFI-PG-S-7212 01 KAIG3-RFI-PG-S-7212-01
KAIG3-RFI-WG-S-7052 01 KAIG3-RFI-WG-S-7052-01
KAIG3-RFI-MB-C-5412 00 KAIG3-RFI-MB-C-5412-00
KAIG3-RFI-TG-C-5411 00 KAIG3-RFI-TG-C-5411-00
KAIG3-RFI-EC-C-5407 00 KAIG3-RFI-EC-C-5407-00
KAIG3-RFI-EC-C-5406 00 KAIG3-RFI-EC-C-5406-00
KAIG3-RFI-WG-C-5396 00 KAIG3-RFI-WG-C-5396-00
KAIG3-RFI-SW-C-5424 00 KAIG3-RFI-SW-C-5424-00
KAIG3-RFI-SW-C-5423 00 KAIG3-RFI-SW-C-5423-00
KAIG3-RFI-SW-C-5422 00 KAIG3-RFI-SW-C-5422-00
KAIG3-RFI-SW-C-5421 00 KAIG3-RFI-SW-C-5421-00
KAIG3-RFI-SW-C-5420 00 KAIG3-RFI-SW-C-5420-00
KAIG3-RFI-SW-C-5419 00 KAIG3-RFI-SW-C-5419-00
KAIG3-RFI-SW-C-5418 00 KAIG3-RFI-SW-C-5418-00
KAIG3-RFI-SW-C-5417 00 KAIG3-RFI-SW-C-5417-00
KAIG3-RFI-SW-C-5416 00 KAIG3-RFI-SW-C-5416-00
KAIG3-RFI-SW-C-5415 00 KAIG3-RFI-SW-C-5415-00
KAIG3-RFI-SW-C-5414 00 KAIG3-RFI-SW-C-5414-00
KAIG3-RFI-SW-C-5413 00 KAIG3-RFI-SW-C-5413-00
KAIG3-RFI-MB-LC-0582 02 KAIG3-RFI-MB-LC-0582-02
KAIG3-RFI-SM-LC-0591 00 KAIG3-RFI-SM-LC-0591-00
KAIG3-RFI-SW-LS-1376 00 KAIG3-RFI-SW-LS-1376-00
KAIG3-RFI-SW-LS-1375 00 KAIG3-RFI-SW-LS-1375-00
KAIG3-RFI-CO-C-5378 00 KAIG3-RFI-CO-C-5378-00
KAIG3-RFI-LM-SU-2525 00 KAIG3-RFI-LM-SU-2525-00
KAIG3-RFI-LM-SU-2523 00 KAIG3-RFI-LM-SU-2523-00
KAIG3-RFI-CO-SU-2526 00 KAIG3-RFI-CO-SU-2526-00
KAIG3-RFI-PC-S-7515 00 KAIG3-RFI-PC-S-7515-00
KAIG3-RFI-CO-S-7514 00 KAIG3-RFI-CO-S-7514-00
KAIG3-RFI-CF-S-7513 00 KAIG3-RFI-CF-S-7513-00
KAIG3-RFI-LM-S-7503 00 KAIG3-RFI-LM-S-7503-00
KAIG3-RFI-CO-S-7477 00 KAIG3-RFI-CO-S-7477-00
KAIG3-RFI-CO-S-7478 00 KAIG3-RFI-CO-S-7478-00
KAIG3-RFI-LM-S-7504 00 KAIG3-RFI-LM-S-7504-00
KAIG3-RFI-LM-S-7505 00 KAIG3-RFI-LM-S-7505-00
KAIG3-RFI-CO-S-7456 00 KAIG3-RFI-CO-S-7456-00
KAIG3-RFI-CO-S-7421 00 KAIG3-RFI-CO-S-7421-00
KAIG3-RFI-CO-S-7458 00 KAIG3-RFI-CO-S-7458-00
KAIG3-RFI-CO-S-7506 00 KAIG3-RFI-CO-S-7506-00
KAIG3-RFI-CO-S-7507 00 KAIG3-RFI-CO-S-7507-00
KAIG3-RFI-CO-S-7508 00 KAIG3-RFI-CO-S-7508-00
KAIG3-RFI-MC-S-7509 00 KAIG3-RFI-MC-S-7509-00
KAIG3-RFI-CO-S-7510 00 KAIG3-RFI-CO-S-7510-00
KAIG3-RFI-LM-S-7511 00 KAIG3-RFI-LM-S-7511-00
KAIG3-RFI-LM-S-7512 00 KAIG3-RFI-LM-S-7512-00
KAIG3-RFI-WG-P-0229 00 KAIG3-RFI-WG-P-0229-00
KAIG3-RFI-SW-C-5399 00 KAIG3-RFI-SW-C-5399-00
KAIG3-RFI-SW-C-5398 00 KAIG3-RFI-SW-C-5398-00
KAIG3-RFI-SW-C-5410 00 KAIG3-RFI-SW-C-5410-00
KAIG3-RFI-SW-C-5409 00 KAIG3-RFI-SW-C-5409-00
KAIG3-RFI-SW-C-5405 00 KAIG3-RFI-SW-C-5405-00
KAIG3-RFI-SW-C-5404 00 KAIG3-RFI-SW-C-5404-00
KAIG3-RFI-SW-C-5403 00 KAIG3-RFI-SW-C-5403-00
KAIG3-RFI-SW-C-5402 00 KAIG3-RFI-SW-C-5402-00
KAIG3-RFI-SW-C-5401 00 KAIG3-RFI-SW-C-5401-00
KAIG3-RFI-SW-C-5400 00 KAIG3-RFI-SW-C-5400-00
KAIG3-RFI-MB-A-0878 00 KAIG3-RFI-MB-A-0878-00
KAIG3-RFI-MB-A-0877 00 KAIG3-RFI-MB-A-0877-00
KAIG3-RFI-SW-A-0876 00 KAIG3-RFI-SW-A-0876-00
KAIG3-RFI-SW-A-0875 00 KAIG3-RFI-SW-A-0875-00
KAIG3-RFI-SW-A-0874 00 KAIG3-RFI-SW-A-0874-00
KAIG3-RFI-SW-A-0873 00 KAIG3-RFI-SW-A-0873-00
KAIG3-RFI-SW-SU-2517 00 KAIG3-RFI-SW-SU-2517-00
KAIG3-RFI-SW-S-7489 00 KAIG3-RFI-SW-S-7489-00
KAIG3-RFI-WG-S-7401 01 KAIG3-RFI-WG-S-7401-01
KAIG3-RFI-TG-C-5395 00 KAIG3-RFI-TG-C-5395-00
KAIG3-RFI-TG-C-5394 00 KAIG3-RFI-TG-C-5394-00
KAIG3-RFI-TG-C-5393 00 KAIG3-RFI-TG-C-5393-00
KAIG3-RFI-TG-C-5392 00 KAIG3-RFI-TG-C-5392-00
KAIG3-RFI-SG-C-5381 00 KAIG3-RFI-SG-C-5381-00
KAIG3-RFI-PG-C-5377 00 KAIG3-RFI-PG-C-5377-00
KAIG3-RFI-TT-LC-0590 00 KAIG3-RFI-TT-LC-0590-00
KAIG3-RFI-TT-LC-0589 00 KAIG3-RFI-TT-LC-0589-00
KAIG3-RFI-SM-LC-0588 00 KAIG3-RFI-SM-LC-0588-00
KAIG3-RFI-PT-LC-0585 00 KAIG3-RFI-PT-LC-0585-00
KAIG3-RFI-PT-LC-0584 00 KAIG3-RFI-PT-LC-0584-00
KAIG3-RFI-MC-SU-2522 00 KAIG3-RFI-MC-SU-2522-00
KAIG3-RFI-PC-SU-2521 00 KAIG3-RFI-PC-SU-2521-00
KAIG3-RFI-SW-C-5397 00 KAIG3-RFI-SW-C-5397-00
KAIG3-RFI-CO-SU-2516 00 KAIG3-RFI-CO-SU-2516-00
KAIG3-RFI-SW-C-5391 00 KAIG3-RFI-SW-C-5391-00
KAIG3-RFI-MC-SU-2520 00 KAIG3-RFI-MC-SU-2520-00
KAIG3-RFI-CO-SU-2513 00 KAIG3-RFI-CO-SU-2513-00
KAIG3-RFI-CO-C-5380 00 KAIG3-RFI-CO-C-5380-00
KAIG3-RFI-SW-C-5390 00 KAIG3-RFI-SW-C-5390-00
KAIG3-RFI-CO-S-7496 00 KAIG3-RFI-CO-S-7496-00
KAIG3-RFI-SW-C-5389 00 KAIG3-RFI-SW-C-5389-00
KAIG3-RFI-CO-S-6408 00 KAIG3-RFI-CO-S-6408-00
KAIG3-RFI-SW-C-5388 00 KAIG3-RFI-SW-C-5388-00
KAIG3-RFI-SW-C-5387 00 KAIG3-RFI-SW-C-5387-00
KAIG3-RFI-PC-S-7465 00 KAIG3-RFI-PC-S-7465-00
KAIG3-RFI-SW-C-5386 00 KAIG3-RFI-SW-C-5386-00
KAIG3-RFI-LM-S-7502 00 KAIG3-RFI-LM-S-7502-00
KAIG3-RFI-SW-C-5385 00 KAIG3-RFI-SW-C-5385-00
KAIG3-RFI-CF-S-7492 00 KAIG3-RFI-CF-S-7492-00
KAIG3-RFI-CO-S-7495 00 KAIG3-RFI-CO-S-7495-00
KAIG3-RFI-CO-S-7486 00 KAIG3-RFI-CO-S-7486-00
KAIG3-RFI-SW-C-5384 00 KAIG3-RFI-SW-C-5384-00
KAIG3-RFI-CO-S-7487 00 KAIG3-RFI-CO-S-7487-00
KAIG3-RFI-CO-S-7488 00 KAIG3-RFI-CO-S-7488-00
KAIG3-RFI-MC-S-7497 00 KAIG3-RFI-MC-S-7497-00
KAIG3-RFI-MC-S-7498 00 KAIG3-RFI-MC-S-7498-00
KAIG3-RFI-MC-S-7499 00 KAIG3-RFI-MC-S-7499-00
KAIG3-RFI-SW-C-5383 00 KAIG3-RFI-SW-C-5383-00
KAIG3-RFI-MC-S-7500 00 KAIG3-RFI-MC-S-7500-00
KAIG3-RFI-CO-S-7479 00 KAIG3-RFI-CO-S-7479-00
KAIG3-RFI-CO-S-7480 00 KAIG3-RFI-CO-S-7480-00
KAIG3-RFI-SW-C-5382 00 KAIG3-RFI-SW-C-5382-00
KAIG3-RFI-MC-S-7482 00 KAIG3-RFI-MC-S-7482-00
KAIG3-RFI-SW-C-5375 00 KAIG3-RFI-SW-C-5375-00
KAIG3-RFI-CO-SS-0234 00 KAIG3-RFI-CO-SS-0234-00
KAIG3-RFI-SW-C-5374 00 KAIG3-RFI-SW-C-5374-00
KAIG3-RFI-SW-P-0228 00 KAIG3-RFI-SW-P-0228-00
KAIG3-RFI-ZG-P-0227 00 KAIG3-RFI-ZG-P-0227-00
KAIG3-RFI-WG-P-0226 00 KAIG3-RFI-WG-P-0226-00
KAIG3-RFI-SW-LS-1379 00 KAIG3-RFI-SW-LS-1379-00
KAIG3-RFI-SW-C-3480 01 KAIG3-RFI-SW-C-3480-01
KAIG3-RFI-TT-A-0872 00 KAIG3-RFI-TT-A-0872-00
KAIG3-RFI-PT-A-0871 00 KAIG3-RFI-PT-A-0871-00
KAIG3-RFI-EC-C-5376 00 KAIG3-RFI-EC-C-5376-00
KAIG3-RFI-MB-S-7467 00 KAIG3-RFI-MB-S-7467-00
KAIG3-RFI-MB-SU-2510 00 KAIG3-RFI-MB-SU-2510-00
KAIG3-RFI-PG-SU-2509 00 KAIG3-RFI-PG-SU-2509-00
KAIG3-RFI-CO-SU-2512 00 KAIG3-RFI-CO-SU-2512-00
KAIG3-RFI-SM-SU-2519 00 KAIG3-RFI-SM-SU-2519-00
KAIG3-RFI-SM-S-7493 00 KAIG3-RFI-SM-S-7493-00
KAIG3-RFI-VA-SU-2514 00 KAIG3-RFI-VA-SU-2514-00
KAIG3-RFI-VA-S-7483 00 KAIG3-RFI-VA-S-7483-00
KAIG3-RFI-VA-S-7485 00 KAIG3-RFI-VA-S-7485-00
KAIG3-RFI-VA-SU-2515 00 KAIG3-RFI-VA-SU-2515-00
KAIG3-RFI-VA-S-7466 00 KAIG3-RFI-VA-S-7466-00
KAIG3-RFI-CO-SS-0231 00 KAIG3-RFI-CO-SS-0231-00
KAIG3-RFI-SW-C-5350 00 KAIG3-RFI-SW-C-5350-00
KAIG3-RFI-PT-E-0455 01 KAIG3-RFI-PT-E-0455-01
KAIG3-RFI-SW-E-0458 00 KAIG3-RFI-SW-E-0458-00
KAIG3-RFI-MB-LC-0583 01 KAIG3-RFI-MB-LC-0583-01
KAIG3-RFI-MB-LC-0582 01 KAIG3-RFI-MB-LC-0582-01
KAIG3-RFI-MB-LC-0581 01 KAIG3-RFI-MB-LC-0581-01
KAIG3-RFI-TB-LC-0587 00 KAIG3-RFI-TB-LC-0587-00
KAIG3-RFI-SW-C-5373 00 KAIG3-RFI-SW-C-5373-00
KAIG3-RFI-SW-C-5372 00 KAIG3-RFI-SW-C-5372-00
KAIG3-RFI-SW-C-5371 00 KAIG3-RFI-SW-C-5371-00
KAIG3-RFI-SW-C-5370 00 KAIG3-RFI-SW-C-5370-00
KAIG3-RFI-SW-C-5369 00 KAIG3-RFI-SW-C-5369-00
KAIG3-RFI-SW-C-5368 00 KAIG3-RFI-SW-C-5368-00
KAIG3-RFI-SW-C-5367 00 KAIG3-RFI-SW-C-5367-00
KAIG3-RFI-SW-C-5366 00 KAIG3-RFI-SW-C-5366-00
KAIG3-RFI-SW-C-3476 01 KAIG3-RFI-SW-C-3476-01
KAIG3-RFI-PA-SS-0061 02 KAIG3-RFI-PA-SS-0061-02
KAIG3-RFI-SW-A-0870 00 KAIG3-RFI-SW-A-0870-00
KAIG3-RFI-SW-A-0869 00 KAIG3-RFI-SW-A-0869-00
KAIG3-RFI-SW-A-0868 00 KAIG3-RFI-SW-A-0868-00
KAIG3-RFI-CO-C-5379 00 KAIG3-RFI-CO-C-5379-00
KAIG3-RFI-SW-A-0867 00 KAIG3-RFI-SW-A-0867-00
KAIG3-RFI-SW-A-0866 00 KAIG3-RFI-SW-A-0866-00
KAIG3-RFI-SW-A-0865 00 KAIG3-RFI-SW-A-0865-00
KAIG3-RFI-CO-SU-2511 00 KAIG3-RFI-CO-SU-2511-00
KAIG3-RFI-ZG-S-7459 00 KAIG3-RFI-ZG-S-7459-00
KAIG3-RFI-CO-S-7473 00 KAIG3-RFI-CO-S-7473-00
KAIG3-RFI-CO-S-7474 00 KAIG3-RFI-CO-S-7474-00
KAIG3-RFI-CO-S-7468 00 KAIG3-RFI-CO-S-7468-00
KAIG3-RFI-CO-S-7457 00 KAIG3-RFI-CO-S-7457-00
KAIG3-RFI-ZG-SU-2506 00 KAIG3-RFI-ZG-SU-2506-00
KAIG3-RFI-EC-C-5186 01 KAIG3-RFI-EC-C-5186-01
KAIG3-RFI-EC-C-5154 01 KAIG3-RFI-EC-C-5154-01
KAIG3-RFI-EC-C-5096 01 KAIG3-RFI-EC-C-5096-01
KAIG3-RFI-EC-C-5083 01 KAIG3-RFI-EC-C-5083-01
KAIG3-RFI-CO-S-7469 00 KAIG3-RFI-CO-S-7469-00
KAIG3-RFI-CO-S-7470 00 KAIG3-RFI-CO-S-7470-00
KAIG3-RFI-CO-S-7471 00 KAIG3-RFI-CO-S-7471-00
KAIG3-RFI-CO-S-7472 00 KAIG3-RFI-CO-S-7472-00
KAIG3-RFI-EC-C-4988 01 KAIG3-RFI-EC-C-4988-01
KAIG3-RFI-TG-C-5358 00 KAIG3-RFI-TG-C-5358-00
KAIG3-RFI-TG-C-5357 00 KAIG3-RFI-TG-C-5357-00
KAIG3-RFI-EC-C-5347 00 KAIG3-RFI-EC-C-5347-00
KAIG3-RFI-WG-S-7454 00 KAIG3-RFI-WG-S-7454-00
KAIG3-RFI-TG-C-5252 01 KAIG3-RFI-TG-C-5252-01
KAIG3-RFI-WG-C-5335 00 KAIG3-RFI-WG-C-5335-00
KAIG3-RFI-WG-C-5329 00 KAIG3-RFI-WG-C-5329-00
KAIG3-RFI-SW-A-0864 00 KAIG3-RFI-SW-A-0864-00
KAIG3-RFI-SW-A-0863 00 KAIG3-RFI-SW-A-0863-00
KAIG3-RFI-SW-A-0862 00 KAIG3-RFI-SW-A-0862-00
KAIG3-RFI-SW-A-0861 00 KAIG3-RFI-SW-A-0861-00
KAIG3-RFI-SW-A-0860 00 KAIG3-RFI-SW-A-0860-00
KAIG3-RFI-MB-A-0859 00 KAIG3-RFI-MB-A-0859-00
KAIG3-RFI-SW-LS-1378 00 KAIG3-RFI-SW-LS-1378-00
KAIG3-RFI-CF-SU-2501 00 KAIG3-RFI-CF-SU-2501-00
KAIG3-RFI-CF-S-7439 00 KAIG3-RFI-CF-S-7439-00
KAIG3-RFI-CO-S-7460 00 KAIG3-RFI-CO-S-7460-00
KAIG3-RFI-CO-S-7455 00 KAIG3-RFI-CO-S-7455-00
KAIG3-RFI-MC-SU-2505 00 KAIG3-RFI-MC-SU-2505-00
KAIG3-RFI-MC-S-7464 00 KAIG3-RFI-MC-S-7464-00
KAIG3-RFI-MC-S-7463 00 KAIG3-RFI-MC-S-7463-00
KAIG3-RFI-MC-S-7462 00 KAIG3-RFI-MC-S-7462-00
KAIG3-RFI-MC-S-7461 00 KAIG3-RFI-MC-S-7461-00
KAIG3-RFI-SW-C-5365 00 KAIG3-RFI-SW-C-5365-00
KAIG3-RFI-SW-C-5364 00 KAIG3-RFI-SW-C-5364-00
KAIG3-RFI-MC-SU-2507 00 KAIG3-RFI-MC-SU-2507-00
KAIG3-RFI-SW-C-5363 00 KAIG3-RFI-SW-C-5363-00
KAIG3-RFI-SW-C-5362 00 KAIG3-RFI-SW-C-5362-00
KAIG3-RFI-CO-SS-0225 00 KAIG3-RFI-CO-SS-0225-00
KAIG3-RFI-CO-SS-0226 00 KAIG3-RFI-CO-SS-0226-00
KAIG3-RFI-SW-C-5361 00 KAIG3-RFI-SW-C-5361-00
KAIG3-RFI-CO-SS-0227 00 KAIG3-RFI-CO-SS-0227-00
KAIG3-RFI-CO-SS-0229 00 KAIG3-RFI-CO-SS-0229-00
KAIG3-RFI-CO-SU-2504 00 KAIG3-RFI-CO-SU-2504-00
KAIG3-RFI-SW-C-5360 00 KAIG3-RFI-SW-C-5360-00
KAIG3-RFI-SW-C-5359 00 KAIG3-RFI-SW-C-5359-00
KAIG3-RFI-SW-C-5355 00 KAIG3-RFI-SW-C-5355-00
KAIG3-RFI-SW-C-5354 00 KAIG3-RFI-SW-C-5354-00
KAIG3-RFI-SW-C-5353 00 KAIG3-RFI-SW-C-5353-00
KAIG3-RFI-SW-C-5352 00 KAIG3-RFI-SW-C-5352-00
KAIG3-RFI-SW-C-5351 00 KAIG3-RFI-SW-C-5351-00
KAIG3-RFI-SW-C-5345 00 KAIG3-RFI-SW-C-5345-00
KAIG3-RFI-SW-C-5344 00 KAIG3-RFI-SW-C-5344-00
KAIG3-RFI-SW-C-5343 00 KAIG3-RFI-SW-C-5343-00
KAIG3-RFI-LM-P-0221 00 KAIG3-RFI-LM-P-0221-00
KAIG3-RFI-SW-C-5342 00 KAIG3-RFI-SW-C-5342-00
KAIG3-RFI-SW-C-5341 00 KAIG3-RFI-SW-C-5341-00
KAIG3-RFI-SW-C-5340 00 KAIG3-RFI-SW-C-5340-00
KAIG3-RFI-SW-C-5339 00 KAIG3-RFI-SW-C-5339-00
KAIG3-RFI-SW-LS-1377 00 KAIG3-RFI-SW-LS-1377-00
KAIG3-RFI-SW-C-5337 00 KAIG3-RFI-SW-C-5337-00
KAIG3-RFI-SW-C-5338 00 KAIG3-RFI-SW-C-5338-00
KAIG3-RFI-SW-C-5356 00 KAIG3-RFI-SW-C-5356-00
KAIG3-RFI-SW-C-5349 00 KAIG3-RFI-SW-C-5349-00
KAIG3-RFI-SW-C-5348 00 KAIG3-RFI-SW-C-5348-00
KAIG3-RFI-SW-C-5346 00 KAIG3-RFI-SW-C-5346-00
KAIG3-RFI-CO-SS-0230 00 KAIG3-RFI-CO-SS-0230-00
KAIG3-RFI-VA-SU-2503 00 KAIG3-RFI-VA-SU-2503-00
KAIG3-RFI-CO-SU-2502 00 KAIG3-RFI-CO-SU-2502-00
KAIG3-RFI-CO-SS-0228 00 KAIG3-RFI-CO-SS-0228-00
KAIG3-RFI-CO-SS-0221 00 KAIG3-RFI-CO-SS-0221-00
KAIG3-RFI-LM-S-7205 00 KAIG3-RFI-LM-S-7205-00
KAIG3-RFI-LM-S-7263 00 KAIG3-RFI-LM-S-7263-00
KAIG3-RFI-LM-S-7222 00 KAIG3-RFI-LM-S-7222-00
KAIG3-RFI-CO-S-7358 00 KAIG3-RFI-CO-S-7358-00
KAIG3-RFI-CO-S-7446 00 KAIG3-RFI-CO-S-7446-00
KAIG3-RFI-CO-S-7447 00 KAIG3-RFI-CO-S-7447-00
KAIG3-RFI-CO-S-7452 00 KAIG3-RFI-CO-S-7452-00
KAIG3-RFI-CO-S-6993 00 KAIG3-RFI-CO-S-6993-00
KAIG3-RFI-CO-S-7303 00 KAIG3-RFI-CO-S-7303-00
KAIG3-RFI-CO-S-7438 00 KAIG3-RFI-CO-S-7438-00
KAIG3-RFI-MC-S-7350 00 KAIG3-RFI-MC-S-7350-00
KAIG3-RFI-MC-S-7428 00 KAIG3-RFI-MC-S-7428-00
KAIG3-RFI-SM-S-7443 00 KAIG3-RFI-SM-S-7443-00
KAIG3-RFI-CO-S-7315 00 KAIG3-RFI-CO-S-7315-00
KAIG3-RFI-CO-S-7177 00 KAIG3-RFI-CO-S-7177-00
KAIG3-RFI-LM-S-7049 00 KAIG3-RFI-LM-S-7049-00
KAIG3-RFI-CO-S-7448 00 KAIG3-RFI-CO-S-7448-00
KAIG3-RFI-LM-S-7093 00 KAIG3-RFI-LM-S-7093-00
KAIG3-RFI-LM-S-7116 00 KAIG3-RFI-LM-S-7116-00
KAIG3-RFI-SW-E-0457 00 KAIG3-RFI-SW-E-0457-00
KAIG3-RFI-CO-S-7449 00 KAIG3-RFI-CO-S-7449-00
KAIG3-RFI-LM-S-7156 00 KAIG3-RFI-LM-S-7156-00
KAIG3-RFI-LM-S-7363 00 KAIG3-RFI-LM-S-7363-00
KAIG3-RFI-CO-SU-2500 00 KAIG3-RFI-CO-SU-2500-00
KAIG3-RFI-CO-S-7437 00 KAIG3-RFI-CO-S-7437-00
KAIG3-RFI-WG-C-4718 01 KAIG3-RFI-WG-C-4718-01
KAIG3-RFI-WG-C-4717 01 KAIG3-RFI-WG-C-4717-01
KAIG3-RFI-TG-C-5328 00 KAIG3-RFI-TG-C-5328-00
KAIG3-RFI-MB-C-5327 00 KAIG3-RFI-MB-C-5327-00
KAIG3-RFI-WG-C-5326 00 KAIG3-RFI-WG-C-5326-00
KAIG3-RFI-EC-C-5325 00 KAIG3-RFI-EC-C-5325-00
KAIG3-RFI-ZG-C-5324 00 KAIG3-RFI-ZG-C-5324-00
KAIG3-RFI-SG-S-7442 00 KAIG3-RFI-SG-S-7442-00
KAIG3-RFI-SG-S-7441 00 KAIG3-RFI-SG-S-7441-00
KAIG3-RFI-PG-S-7436 00 KAIG3-RFI-PG-S-7436-00
KAIG3-RFI-PG-S-7435 00 KAIG3-RFI-PG-S-7435-00
KAIG3-RFI-TT-A-0858 00 KAIG3-RFI-TT-A-0858-00
KAIG3-RFI-SW-A-0857 00 KAIG3-RFI-SW-A-0857-00
KAIG3-RFI-SW-C-5334 00 KAIG3-RFI-SW-C-5334-00
KAIG3-RFI-SW-C-5333 00 KAIG3-RFI-SW-C-5333-00
KAIG3-RFI-SW-C-5197 00 KAIG3-RFI-SW-C-5197-00
KAIG3-RFI-TG-SS-0220 00 KAIG3-RFI-TG-SS-0220-00
KAIG3-RFI-TG-SS-0169 01 KAIG3-RFI-TG-SS-0169-01
KAIG3-RFI-TG-SS-0160 01 KAIG3-RFI-TG-SS-0160-01
KAIG3-RFI-TG-SS-0161 01 KAIG3-RFI-TG-SS-0161-01
KAIG3-RFI-TB-E-0456 00 KAIG3-RFI-TB-E-0456-00
KAIG3-RFI-TG-SS-0146 02 KAIG3-RFI-TG-SS-0146-02
KAIG3-RFI-SW-C-5331 00 KAIG3-RFI-SW-C-5331-00
KAIG3-RFI-SW-C-5323 00 KAIG3-RFI-SW-C-5323-00
KAIG3-RFI-SW-C-5322 00 KAIG3-RFI-SW-C-5322-00
KAIG3-RFI-SW-C-5321 00 KAIG3-RFI-SW-C-5321-00
KAIG3-RFI-SW-C-5320 00 KAIG3-RFI-SW-C-5320-00
KAIG3-RFI-SW-C-5319 00 KAIG3-RFI-SW-C-5319-00
KAIG3-RFI-SW-C-5318 00 KAIG3-RFI-SW-C-5318-00
KAIG3-RFI-SW-C-5317 00 KAIG3-RFI-SW-C-5317-00
KAIG3-RFI-WG-SU-2496 00 KAIG3-RFI-WG-SU-2496-00
KAIG3-RFI-WG-C-5312 00 KAIG3-RFI-WG-C-5312-00
KAIG3-RFI-ZG-C-5303 00 KAIG3-RFI-ZG-C-5303-00
KAIG3-RFI-PT-A-0856 00 KAIG3-RFI-PT-A-0856-00
KAIG3-RFI-TG-A-0855 00 KAIG3-RFI-TG-A-0855-00
KAIG3-RFI-PG-A-0854 00 KAIG3-RFI-PG-A-0854-00
KAIG3-RFI-PG-A-0853 00 KAIG3-RFI-PG-A-0853-00
KAIG3-RFI-PG-A-0852 00 KAIG3-RFI-PG-A-0852-00
KAIG3-RFI-PG-A-0851 00 KAIG3-RFI-PG-A-0851-00
KAIG3-RFI-SW-S-7434 00 KAIG3-RFI-SW-S-7434-00
KAIG3-RFI-WG-S-7426 00 KAIG3-RFI-WG-S-7426-00
KAIG3-RFI-PG-S-7418 00 KAIG3-RFI-PG-S-7418-00
KAIG3-RFI-SW-C-5316 00 KAIG3-RFI-SW-C-5316-00
KAIG3-RFI-SW-C-5315 00 KAIG3-RFI-SW-C-5315-00
KAIG3-RFI-SW-C-5314 00 KAIG3-RFI-SW-C-5314-00
KAIG3-RFI-SW-A-0850 00 KAIG3-RFI-SW-A-0850-00
KAIG3-RFI-SW-C-5313 00 KAIG3-RFI-SW-C-5313-00
KAIG3-RFI-SW-A-0849 00 KAIG3-RFI-SW-A-0849-00
KAIG3-RFI-SW-SU-2490 00 KAIG3-RFI-SW-SU-2490-00
KAIG3-RFI-ZG-S-7395 00 KAIG3-RFI-ZG-S-7395-00
KAIG3-RFI-WG-C-5302 00 KAIG3-RFI-WG-C-5302-00
KAIG3-RFI-WG-C-5298 00 KAIG3-RFI-WG-C-5298-00
KAIG3-RFI-ZG-C-5297 00 KAIG3-RFI-ZG-C-5297-00
KAIG3-RFI-EC-C-5296 00 KAIG3-RFI-EC-C-5296-00
KAIG3-RFI-WG-C-5284 00 KAIG3-RFI-WG-C-5284-00
KAIG3-RFI-WG-C-5283 00 KAIG3-RFI-WG-C-5283-00
KAIG3-RFI-SW-C-5310 00 KAIG3-RFI-SW-C-5310-00
KAIG3-RFI-SW-C-5309 00 KAIG3-RFI-SW-C-5309-00
KAIG3-RFI-SW-C-5308 00 KAIG3-RFI-SW-C-5308-00
KAIG3-RFI-SW-C-5307 00 KAIG3-RFI-SW-C-5307-00
KAIG3-RFI-SW-C-5306 00 KAIG3-RFI-SW-C-5306-00
KAIG3-RFI-SW-C-5305 00 KAIG3-RFI-SW-C-5305-00
KAIG3-RFI-SW-C-5304 00 KAIG3-RFI-SW-C-5304-00
KAIG3-RFI-BO-LC-0586 00 KAIG3-RFI-BO-LC-0586-00
KAIG3-RFI-VG-C-5301 00 KAIG3-RFI-VG-C-5301-00
KAIG3-RFI-CO-SS-0224 00 KAIG3-RFI-CO-SS-0224-00
KAIG3-RFI-PT-E-0455 00 KAIG3-RFI-PT-E-0455-00
KAIG3-RFI-CO-SS-0223 00 KAIG3-RFI-CO-SS-0223-00
KAIG3-RFI-MC-S-7427 00 KAIG3-RFI-MC-S-7427-00
KAIG3-RFI-MC-S-7429 00 KAIG3-RFI-MC-S-7429-00
KAIG3-RFI-MC-S-7430 00 KAIG3-RFI-MC-S-7430-00
KAIG3-RFI-MC-S-7431 00 KAIG3-RFI-MC-S-7431-00
KAIG3-RFI-CO-S-7432 00 KAIG3-RFI-CO-S-7432-00
KAIG3-RFI-CO-S-7433 00 KAIG3-RFI-CO-S-7433-00
KAIG3-RFI-CO-S-7424 00 KAIG3-RFI-CO-S-7424-00
KAIG3-RFI-CO-S-7425 00 KAIG3-RFI-CO-S-7425-00
KAIG3-RFI-CO-S-7420 00 KAIG3-RFI-CO-S-7420-00
KAIG3-RFI-CO-S-7423 00 KAIG3-RFI-CO-S-7423-00
KAIG3-RFI-CO-S-7422 00 KAIG3-RFI-CO-S-7422-00
KAIG3-RFI-CO-S-7419 00 KAIG3-RFI-CO-S-7419-00
KAIG3-RFI-CO-S-7410 00 KAIG3-RFI-CO-S-7410-00
KAIG3-RFI-CO-S-7411 00 KAIG3-RFI-CO-S-7411-00
KAIG3-RFI-CO-SU-2494 00 KAIG3-RFI-CO-SU-2494-00
KAIG3-RFI-MC-SU-2497 00 KAIG3-RFI-MC-SU-2497-00
KAIG3-RFI-MC-SU-2498 00 KAIG3-RFI-MC-SU-2498-00
KAIG3-RFI-CO-SU-2495 00 KAIG3-RFI-CO-SU-2495-00
KAIG3-RFI-VA-SU-2499 00 KAIG3-RFI-VA-SU-2499-00
KAIG3-RFI-CO-SU-2492 00 KAIG3-RFI-CO-SU-2492-00
KAIG3-RFI-CO-SS-0193 01 KAIG3-RFI-CO-SS-0193-01
KAIG3-RFI-CO-SS-0219 00 KAIG3-RFI-CO-SS-0219-00
KAIG3-RFI-CO-SS-0222 00 KAIG3-RFI-CO-SS-0222-00
KAIG3-RFI-CO-SU-2491 00 KAIG3-RFI-CO-SU-2491-00
KAIG3-RFI-CO-SS-0218 00 KAIG3-RFI-CO-SS-0218-00
KAIG3-RFI-PC-SU-2489 00 KAIG3-RFI-PC-SU-2489-00
KAIG3-RFI-SW-LS-1374 00 KAIG3-RFI-SW-LS-1374-00
KAIG3-RFI-SW-LS-1373 00 KAIG3-RFI-SW-LS-1373-00
KAIG3-RFI-CO-S-7255 00 KAIG3-RFI-CO-S-7255-00
KAIG3-RFI-CO-S-7206 00 KAIG3-RFI-CO-S-7206-00
KAIG3-RFI-SW-P-0225 00 KAIG3-RFI-SW-P-0225-00
KAIG3-RFI-CO-S-7417 00 KAIG3-RFI-CO-S-7417-00
KAIG3-RFI-CO-S-7416 00 KAIG3-RFI-CO-S-7416-00
KAIG3-RFI-CO-S-7409 00 KAIG3-RFI-CO-S-7409-00
KAIG3-RFI-CO-S-7384 00 KAIG3-RFI-CO-S-7384-00
KAIG3-RFI-CO-S-7385 00 KAIG3-RFI-CO-S-7385-00
KAIG3-RFI-CO-S-7407 00 KAIG3-RFI-CO-S-7407-00
KAIG3-RFI-CO-S-7408 00 KAIG3-RFI-CO-S-7408-00
KAIG3-RFI-CO-S-7383 00 KAIG3-RFI-CO-S-7383-00
KAIG3-RFI-CO-S-7403 00 KAIG3-RFI-CO-S-7403-00
KAIG3-RFI-PC-S-7404 00 KAIG3-RFI-PC-S-7404-00
KAIG3-RFI-PC-S-7405 00 KAIG3-RFI-PC-S-7405-00
KAIG3-RFI-CO-S-7412 00 KAIG3-RFI-CO-S-7412-00
KAIG3-RFI-CO-S-7413 00 KAIG3-RFI-CO-S-7413-00
KAIG3-RFI-SW-C-5300 00 KAIG3-RFI-SW-C-5300-00
KAIG3-RFI-CO-S-7414 00 KAIG3-RFI-CO-S-7414-00
KAIG3-RFI-SW-C-5299 00 KAIG3-RFI-SW-C-5299-00
KAIG3-RFI-SW-C-5295 00 KAIG3-RFI-SW-C-5295-00
KAIG3-RFI-CO-SS-0166 03 KAIG3-RFI-CO-SS-0166-03
KAIG3-RFI-SW-C-5294 00 KAIG3-RFI-SW-C-5294-00
KAIG3-RFI-SW-C-5293 00 KAIG3-RFI-SW-C-5293-00
KAIG3-RFI-SW-C-5292 00 KAIG3-RFI-SW-C-5292-00
KAIG3-RFI-SW-C-5291 00 KAIG3-RFI-SW-C-5291-00
KAIG3-RFI-SW-C-5290 00 KAIG3-RFI-SW-C-5290-00
KAIG3-RFI-SW-C-5289 00 KAIG3-RFI-SW-C-5289-00
KAIG3-RFI-SW-C-5288 00 KAIG3-RFI-SW-C-5288-00
KAIG3-RFI-SW-C-5287 00 KAIG3-RFI-SW-C-5287-00
KAIG3-RFI-SW-C-5286 00 KAIG3-RFI-SW-C-5286-00
KAIG3-RFI-SW-C-5285 00 KAIG3-RFI-SW-C-5285-00
KAIG3-RFI-CO-SS-0186 01 KAIG3-RFI-CO-SS-0186-01
KAIG3-RFI-CO-SS-0216 00 KAIG3-RFI-CO-SS-0216-00
KAIG3-RFI-CO-SS-0215 00 KAIG3-RFI-CO-SS-0215-00
KAIG3-RFI-CO-SS-0213 00 KAIG3-RFI-CO-SS-0213-00
KAIG3-RFI-CO-SS-0212 00 KAIG3-RFI-CO-SS-0212-00
KAIG3-RFI-CO-SS-0211 00 KAIG3-RFI-CO-SS-0211-00
KAIG3-RFI-CO-SS-0210 00 KAIG3-RFI-CO-SS-0210-00
KAIG3-RFI-CO-SS-0201 01 KAIG3-RFI-CO-SS-0201-01
KAIG3-RFI-CO-SS-0200 00 KAIG3-RFI-CO-SS-0200-00
KAIG3-RFI-TT-A-0848 00 KAIG3-RFI-TT-A-0848-00
KAIG3-RFI-MB-C-5278 00 KAIG3-RFI-MB-C-5278-00
KAIG3-RFI-ZG-C-5277 00 KAIG3-RFI-ZG-C-5277-00
KAIG3-RFI-ZG-C-5276 00 KAIG3-RFI-ZG-C-5276-00
KAIG3-RFI-TG-C-5267 00 KAIG3-RFI-TG-C-5267-00
KAIG3-RFI-WG-C-5266 00 KAIG3-RFI-WG-C-5266-00
KAIG3-RFI-WG-S-7401 00 KAIG3-RFI-WG-S-7401-00
KAIG3-RFI-SW-S-7400 00 KAIG3-RFI-SW-S-7400-00
KAIG3-RFI-PG-S-7396 00 KAIG3-RFI-PG-S-7396-00
KAIG3-RFI-WG-S-7394 00 KAIG3-RFI-WG-S-7394-00
KAIG3-RFI-CO-S-7145 00 KAIG3-RFI-CO-S-7145-00
KAIG3-RFI-SW-C-5279 00 KAIG3-RFI-SW-C-5279-00
KAIG3-RFI-SW-C-5280 00 KAIG3-RFI-SW-C-5280-00
KAIG3-RFI-SW-C-5275 00 KAIG3-RFI-SW-C-5275-00
KAIG3-RFI-SW-C-5274 00 KAIG3-RFI-SW-C-5274-00
KAIG3-RFI-SW-C-5273 00 KAIG3-RFI-SW-C-5273-00
KAIG3-RFI-SW-C-5272 00 KAIG3-RFI-SW-C-5272-00
KAIG3-RFI-SW-C-5271 00 KAIG3-RFI-SW-C-5271-00
KAIG3-RFI-MC-SU-2486 00 KAIG3-RFI-MC-SU-2486-00
KAIG3-RFI-PC-SU-2487 00 KAIG3-RFI-PC-SU-2487-00
KAIG3-RFI-WG-LS-1372 00 KAIG3-RFI-WG-LS-1372-00
KAIG3-RFI-SW-C-5245 00 KAIG3-RFI-SW-C-5245-00
KAIG3-RFI-SW-C-5244 00 KAIG3-RFI-SW-C-5244-00
KAIG3-RFI-CO-S-7397 00 KAIG3-RFI-CO-S-7397-00
KAIG3-RFI-PC-S-7398 00 KAIG3-RFI-PC-S-7398-00
KAIG3-RFI-PC-S-7399 00 KAIG3-RFI-PC-S-7399-00
KAIG3-RFI-MC-S-7392 00 KAIG3-RFI-MC-S-7392-00
KAIG3-RFI-MC-S-7393 00 KAIG3-RFI-MC-S-7393-00
KAIG3-RFI-SW-C-5269 00 KAIG3-RFI-SW-C-5269-00
KAIG3-RFI-SW-C-5268 00 KAIG3-RFI-SW-C-5268-00
KAIG3-RFI-SW-C-5265 00 KAIG3-RFI-SW-C-5265-00
KAIG3-RFI-MB-SU-2485 00 KAIG3-RFI-MB-SU-2485-00
KAIG3-RFI-TB-SU-2481 00 KAIG3-RFI-TB-SU-2481-00
KAIG3-RFI-CO-A-0847 00 KAIG3-RFI-CO-A-0847-00
KAIG3-RFI-EC-C-5257 00 KAIG3-RFI-EC-C-5257-00
KAIG3-RFI-CO-A-0846 00 KAIG3-RFI-CO-A-0846-00
KAIG3-RFI-CO-A-0845 00 KAIG3-RFI-CO-A-0845-00
KAIG3-RFI-MB-S-7391 00 KAIG3-RFI-MB-S-7391-00
KAIG3-RFI-TB-S-7379 00 KAIG3-RFI-TB-S-7379-00
KAIG3-RFI-CO-A-0844 00 KAIG3-RFI-CO-A-0844-00
KAIG3-RFI-TG-S-7378 00 KAIG3-RFI-TG-S-7378-00
KAIG3-RFI-CO-A-0843 00 KAIG3-RFI-CO-A-0843-00
KAIG3-RFI-TB-S-7377 00 KAIG3-RFI-TB-S-7377-00
KAIG3-RFI-CO-A-0842 00 KAIG3-RFI-CO-A-0842-00
KAIG3-RFI-CO-A-0841 00 KAIG3-RFI-CO-A-0841-00
KAIG3-RFI-CO-A-0840 00 KAIG3-RFI-CO-A-0840-00
KAIG3-RFI-CO-A-0839 00 KAIG3-RFI-CO-A-0839-00
KAIG3-RFI-CO-A-0838 00 KAIG3-RFI-CO-A-0838-00
KAIG3-RFI-LM-C-5270 00 KAIG3-RFI-LM-C-5270-00
KAIG3-RFI-VA-SU-2484 00 KAIG3-RFI-VA-SU-2484-00
KAIG3-RFI-PC-SU-2483 00 KAIG3-RFI-PC-SU-2483-00
KAIG3-RFI-CO-SU-2482 00 KAIG3-RFI-CO-SU-2482-00
KAIG3-RFI-CO-SU-2403 01 KAIG3-RFI-CO-SU-2403-01
KAIG3-RFI-MC-S-7105 01 KAIG3-RFI-MC-S-7105-01
KAIG3-RFI-CO-S-7133 01 KAIG3-RFI-CO-S-7133-01
KAIG3-RFI-VA-S-7388 00 KAIG3-RFI-VA-S-7388-00
KAIG3-RFI-VA-S-7389 00 KAIG3-RFI-VA-S-7389-00
KAIG3-RFI-PC-S-7386 00 KAIG3-RFI-PC-S-7386-00
KAIG3-RFI-PC-S-7387 00 KAIG3-RFI-PC-S-7387-00
KAIG3-RFI-CO-S-7380 00 KAIG3-RFI-CO-S-7380-00
KAIG3-RFI-CO-S-7381 00 KAIG3-RFI-CO-S-7381-00
KAIG3-RFI-CO-S-7382 00 KAIG3-RFI-CO-S-7382-00
KAIG3-RFI-MC-S-7376 00 KAIG3-RFI-MC-S-7376-00
KAIG3-RFI-SW-C-5264 00 KAIG3-RFI-SW-C-5264-00
KAIG3-RFI-SW-C-5263 00 KAIG3-RFI-SW-C-5263-00
KAIG3-RFI-SW-C-5262 00 KAIG3-RFI-SW-C-5262-00
KAIG3-RFI-SW-C-5261 00 KAIG3-RFI-SW-C-5261-00
KAIG3-RFI-SW-C-5260 00 KAIG3-RFI-SW-C-5260-00
KAIG3-RFI-SW-C-5259 00 KAIG3-RFI-SW-C-5259-00
KAIG3-RFI-PG-A-0837 00 KAIG3-RFI-PG-A-0837-00
KAIG3-RFI-PG-A-0836 00 KAIG3-RFI-PG-A-0836-00
KAIG3-RFI-SW-A-0835 00 KAIG3-RFI-SW-A-0835-00
KAIG3-RFI-PG-S-7375 00 KAIG3-RFI-PG-S-7375-00
KAIG3-RFI-TG-S-7374 00 KAIG3-RFI-TG-S-7374-00
KAIG3-RFI-ZG-C-5173 01 KAIG3-RFI-ZG-C-5173-01
KAIG3-RFI-ZG-C-5172 01 KAIG3-RFI-ZG-C-5172-01
KAIG3-RFI-TG-C-5235 01 KAIG3-RFI-TG-C-5235-01
KAIG3-RFI-WG-C-5254 00 KAIG3-RFI-WG-C-5254-00
KAIG3-RFI-EC-C-5253 00 KAIG3-RFI-EC-C-5253-00
KAIG3-RFI-SW-C-5256 00 KAIG3-RFI-SW-C-5256-00
KAIG3-RFI-SW-C-5255 00 KAIG3-RFI-SW-C-5255-00
KAIG3-RFI-TG-C-5252 00 KAIG3-RFI-TG-C-5252-00
KAIG3-RFI-WG-C-5251 00 KAIG3-RFI-WG-C-5251-00
KAIG3-RFI-TG-C-5250 00 KAIG3-RFI-TG-C-5250-00
KAIG3-RFI-WG-C-5249 00 KAIG3-RFI-WG-C-5249-00
KAIG3-RFI-WG-C-5246 00 KAIG3-RFI-WG-C-5246-00
KAIG3-RFI-WG-C-5240 00 KAIG3-RFI-WG-C-5240-00
KAIG3-RFI-PG-S-7370 00 KAIG3-RFI-PG-S-7370-00
KAIG3-RFI-SW-A-0806 01 KAIG3-RFI-SW-A-0806-01
KAIG3-RFI-MB-A-0834 00 KAIG3-RFI-MB-A-0834-00
KAIG3-RFI-MB-A-0833 00 KAIG3-RFI-MB-A-0833-00
KAIG3-RFI-PG-A-0832 00 KAIG3-RFI-PG-A-0832-00
KAIG3-RFI-TG-A-0831 00 KAIG3-RFI-TG-A-0831-00
KAIG3-RFI-SW-C-5248 00 KAIG3-RFI-SW-C-5248-00
KAIG3-RFI-SW-C-5247 00 KAIG3-RFI-SW-C-5247-00
KAIG3-RFI-SW-C-5243 00 KAIG3-RFI-SW-C-5243-00
KAIG3-RFI-SW-C-5242 00 KAIG3-RFI-SW-C-5242-00
KAIG3-RFI-SW-C-5241 00 KAIG3-RFI-SW-C-5241-00
KAIG3-RFI-CO-SS-0209 00 KAIG3-RFI-CO-SS-0209-00
KAIG3-RFI-CO-SS-0208 00 KAIG3-RFI-CO-SS-0208-00
KAIG3-RFI-CO-SS-0205 00 KAIG3-RFI-CO-SS-0205-00
KAIG3-RFI-CO-SS-0207 00 KAIG3-RFI-CO-SS-0207-00
KAIG3-RFI-MC-C-5229 00 KAIG3-RFI-MC-C-5229-00
KAIG3-RFI-CO-SU-2480 00 KAIG3-RFI-CO-SU-2480-00
KAIG3-RFI-CO-SU-2475 00 KAIG3-RFI-CO-SU-2475-00
KAIG3-RFI-LM-SU-2476 00 KAIG3-RFI-LM-SU-2476-00
KAIG3-RFI-CO-SU-2477 00 KAIG3-RFI-CO-SU-2477-00
KAIG3-RFI-CO-S-7371 00 KAIG3-RFI-CO-S-7371-00
KAIG3-RFI-CO-S-7372 00 KAIG3-RFI-CO-S-7372-00
KAIG3-RFI-CO-S-7368 00 KAIG3-RFI-CO-S-7368-00
KAIG3-RFI-SW-E-0433 02 KAIG3-RFI-SW-E-0433-02
KAIG3-RFI-SW-E-0440 01 KAIG3-RFI-SW-E-0440-01
KAIG3-RFI-SW-E-0438 01 KAIG3-RFI-SW-E-0438-01
KAIG3-RFI-DG-E-0441 01 KAIG3-RFI-DG-E-0441-01
KAIG3-RFI-DG-LC-0563 01 KAIG3-RFI-DG-LC-0563-01
KAIG3-RFI-DG-LC-0562 01 KAIG3-RFI-DG-LC-0562-01
KAIG3-RFI-MB-LC-0583 00 KAIG3-RFI-MB-LC-0583-00
KAIG3-RFI-MB-LC-0582 00 KAIG3-RFI-MB-LC-0582-00
KAIG3-RFI-MB-LC-0581 00 KAIG3-RFI-MB-LC-0581-00
KAIG3-RFI-CO-S-7369 00 KAIG3-RFI-CO-S-7369-00
KAIG3-RFI-CO-S-7356 00 KAIG3-RFI-CO-S-7356-00
KAIG3-RFI-CO-S-7357 00 KAIG3-RFI-CO-S-7357-00
KAIG3-RFI-LM-S-7361 00 KAIG3-RFI-LM-S-7361-00
KAIG3-RFI-LM-S-7362 00 KAIG3-RFI-LM-S-7362-00
KAIG3-RFI-SW-S-7367 00 KAIG3-RFI-SW-S-7367-00
KAIG3-RFI-MB-S-7366 00 KAIG3-RFI-MB-S-7366-00
KAIG3-RFI-MB-S-7365 00 KAIG3-RFI-MB-S-7365-00
KAIG3-RFI-TB-S-7364 00 KAIG3-RFI-TB-S-7364-00
KAIG3-RFI-SW-SU-2479 00 KAIG3-RFI-SW-SU-2479-00
KAIG3-RFI-TB-SU-2478 00 KAIG3-RFI-TB-SU-2478-00
KAIG3-RFI-TB-SS-0214 00 KAIG3-RFI-TB-SS-0214-00
KAIG3-RFI-SW-C-5239 00 KAIG3-RFI-SW-C-5239-00
KAIG3-RFI-ZG-C-5238 00 KAIG3-RFI-ZG-C-5238-00
KAIG3-RFI-WG-C-5237 00 KAIG3-RFI-WG-C-5237-00
KAIG3-RFI-TG-C-5236 00 KAIG3-RFI-TG-C-5236-00
KAIG3-RFI-TG-C-5235 00 KAIG3-RFI-TG-C-5235-00
KAIG3-RFI-TG-C-5234 00 KAIG3-RFI-TG-C-5234-00
KAIG3-RFI-SW-C-5233 00 KAIG3-RFI-SW-C-5233-00
KAIG3-RFI-SW-LS-1371 00 KAIG3-RFI-SW-LS-1371-00
KAIG3-RFI-SW-C-5232 00 KAIG3-RFI-SW-C-5232-00
KAIG3-RFI-SW-C-5231 00 KAIG3-RFI-SW-C-5231-00
KAIG3-RFI-SW-C-5230 00 KAIG3-RFI-SW-C-5230-00
KAIG3-RFI-SW-C-5227 00 KAIG3-RFI-SW-C-5227-00
KAIG3-RFI-SW-C-5226 00 KAIG3-RFI-SW-C-5226-00
KAIG3-RFI-MC-C-5219 00 KAIG3-RFI-MC-C-5219-00
KAIG3-RFI-CO-SS-0204 00 KAIG3-RFI-CO-SS-0204-00
KAIG3-RFI-CO-SS-0203 00 KAIG3-RFI-CO-SS-0203-00
KAIG3-RFI-CO-SS-0206 00 KAIG3-RFI-CO-SS-0206-00
KAIG3-RFI-CO-SU-2469 00 KAIG3-RFI-CO-SU-2469-00
KAIG3-RFI-CO-SU-2470 00 KAIG3-RFI-CO-SU-2470-00
KAIG3-RFI-CO-SU-2472 00 KAIG3-RFI-CO-SU-2472-00
KAIG3-RFI-CO-SS-0173 00 KAIG3-RFI-CO-SS-0173-00
KAIG3-RFI-VA-SU-2471 00 KAIG3-RFI-VA-SU-2471-00
KAIG3-RFI-PC-SU-2474 00 KAIG3-RFI-PC-SU-2474-00
KAIG3-RFI-MC-SU-2473 00 KAIG3-RFI-MC-SU-2473-00
KAIG3-RFI-MC-S-7349 00 KAIG3-RFI-MC-S-7349-00
KAIG3-RFI-MC-S-7351 00 KAIG3-RFI-MC-S-7351-00
KAIG3-RFI-PC-S-7352 00 KAIG3-RFI-PC-S-7352-00
KAIG3-RFI-PC-S-7353 00 KAIG3-RFI-PC-S-7353-00
KAIG3-RFI-PC-S-7354 00 KAIG3-RFI-PC-S-7354-00
KAIG3-RFI-CO-S-7338 00 KAIG3-RFI-CO-S-7338-00
KAIG3-RFI-CO-S-7339 00 KAIG3-RFI-CO-S-7339-00
KAIG3-RFI-CO-S-7340 00 KAIG3-RFI-CO-S-7340-00
KAIG3-RFI-CO-S-7342 00 KAIG3-RFI-CO-S-7342-00
KAIG3-RFI-CO-S-7343 00 KAIG3-RFI-CO-S-7343-00
KAIG3-RFI-ZG-SU-2468 00 KAIG3-RFI-ZG-SU-2468-00
KAIG3-RFI-ZG-C-5173 00 KAIG3-RFI-ZG-C-5173-00
KAIG3-RFI-ZG-C-5172 00 KAIG3-RFI-ZG-C-5172-00
KAIG3-RFI-WG-C-5228 00 KAIG3-RFI-WG-C-5228-00
KAIG3-RFI-EC-C-5221 00 KAIG3-RFI-EC-C-5221-00
KAIG3-RFI-WG-C-5220 00 KAIG3-RFI-WG-C-5220-00
KAIG3-RFI-ZG-S-7336 00 KAIG3-RFI-ZG-S-7336-00
KAIG3-RFI-WG-S-7348 00 KAIG3-RFI-WG-S-7348-00
KAIG3-RFI-WG-S-7347 00 KAIG3-RFI-WG-S-7347-00
KAIG3-RFI-TG-S-7346 00 KAIG3-RFI-TG-S-7346-00
KAIG3-RFI-TG-S-7345 00 KAIG3-RFI-TG-S-7345-00
KAIG3-RFI-TG-S-7344 00 KAIG3-RFI-TG-S-7344-00
KAIG3-RFI-PT-A-0830 00 KAIG3-RFI-PT-A-0830-00
KAIG3-RFI-PT-A-0829 00 KAIG3-RFI-PT-A-0829-00
KAIG3-RFI-TG-A-0828 00 KAIG3-RFI-TG-A-0828-00
KAIG3-RFI-SW-A-0827 00 KAIG3-RFI-SW-A-0827-00
KAIG3-RFI-SW-A-0826 00 KAIG3-RFI-SW-A-0826-00
KAIG3-RFI-WG-C-5218 00 KAIG3-RFI-WG-C-5218-00
KAIG3-RFI-SW-C-5225 00 KAIG3-RFI-SW-C-5225-00
KAIG3-RFI-TG-C-5217 00 KAIG3-RFI-TG-C-5217-00
KAIG3-RFI-SW-C-5224 00 KAIG3-RFI-SW-C-5224-00
KAIG3-RFI-SW-C-5223 00 KAIG3-RFI-SW-C-5223-00
KAIG3-RFI-SW-C-5222 00 KAIG3-RFI-SW-C-5222-00
KAIG3-RFI-TG-C-5216 00 KAIG3-RFI-TG-C-5216-00
KAIG3-RFI-TG-C-5215 00 KAIG3-RFI-TG-C-5215-00
KAIG3-RFI-SW-C-5214 00 KAIG3-RFI-SW-C-5214-00
KAIG3-RFI-EC-C-5206 00 KAIG3-RFI-EC-C-5206-00
KAIG3-RFI-ZG-S-7337 00 KAIG3-RFI-ZG-S-7337-00
KAIG3-RFI-PG-S-7320 00 KAIG3-RFI-PG-S-7320-00
KAIG3-RFI-SM-E-0453 00 KAIG3-RFI-SM-E-0453-00
KAIG3-RFI-MB-E-0452 00 KAIG3-RFI-MB-E-0452-00
KAIG3-RFI-MB-LC-0580 00 KAIG3-RFI-MB-LC-0580-00
KAIG3-RFI-SM-LC-0579 00 KAIG3-RFI-SM-LC-0579-00
KAIG3-RFI-SW-LC-0504 02 KAIG3-RFI-SW-LC-0504-02
KAIG3-RFI-SW-LC-0503 02 KAIG3-RFI-SW-LC-0503-02
KAIG3-RFI-CO-C-5207 00 KAIG3-RFI-CO-C-5207-00
KAIG3-RFI-CO-SU-2465 00 KAIG3-RFI-CO-SU-2465-00
KAIG3-RFI-VA-SU-2466 00 KAIG3-RFI-VA-SU-2466-00
KAIG3-RFI-CO-S-7330 00 KAIG3-RFI-CO-S-7330-00
KAIG3-RFI-CO-S-7327 00 KAIG3-RFI-CO-S-7327-00
KAIG3-RFI-CO-S-7331 00 KAIG3-RFI-CO-S-7331-00
KAIG3-RFI-MC-S-7332 00 KAIG3-RFI-MC-S-7332-00
KAIG3-RFI-CO-SU-2425 00 KAIG3-RFI-CO-SU-2425-00
KAIG3-RFI-VA-S-7333 00 KAIG3-RFI-VA-S-7333-00
KAIG3-RFI-VA-S-7334 00 KAIG3-RFI-VA-S-7334-00
KAIG3-RFI-PG-SU-2467 00 KAIG3-RFI-PG-SU-2467-00
KAIG3-RFI-SW-P-0224 00 KAIG3-RFI-SW-P-0224-00
KAIG3-RFI-SW-C-5213 00 KAIG3-RFI-SW-C-5213-00
KAIG3-RFI-SW-C-5212 00 KAIG3-RFI-SW-C-5212-00
KAIG3-RFI-SW-C-5211 00 KAIG3-RFI-SW-C-5211-00
KAIG3-RFI-SW-C-5210 00 KAIG3-RFI-SW-C-5210-00
KAIG3-RFI-SW-C-5209 00 KAIG3-RFI-SW-C-5209-00
KAIG3-RFI-SW-C-5208 00 KAIG3-RFI-SW-C-5208-00
KAIG3-RFI-CO-C-5198 00 KAIG3-RFI-CO-C-5198-00
KAIG3-RFI-MC-C-5199 00 KAIG3-RFI-MC-C-5199-00
KAIG3-RFI-PC-SU-2463 00 KAIG3-RFI-PC-SU-2463-00
KAIG3-RFI-CO-SU-2464 00 KAIG3-RFI-CO-SU-2464-00
KAIG3-RFI-CO-SU-2462 00 KAIG3-RFI-CO-SU-2462-00
KAIG3-RFI-PC-S-7322 00 KAIG3-RFI-PC-S-7322-00
KAIG3-RFI-PC-S-7323 00 KAIG3-RFI-PC-S-7323-00
KAIG3-RFI-CO-S-7324 00 KAIG3-RFI-CO-S-7324-00
KAIG3-RFI-CO-S-7325 00 KAIG3-RFI-CO-S-7325-00
KAIG3-RFI-CO-S-7313 00 KAIG3-RFI-CO-S-7313-00
KAIG3-RFI-CO-S-7065 00 KAIG3-RFI-CO-S-7065-00
KAIG3-RFI-CO-S-7329 00 KAIG3-RFI-CO-S-7329-00
KAIG3-RFI-CO-S-7314 00 KAIG3-RFI-CO-S-7314-00
KAIG3-RFI-CO-SS-0202 00 KAIG3-RFI-CO-SS-0202-00
KAIG3-RFI-CO-SS-0201 00 KAIG3-RFI-CO-SS-0201-00
KAIG3-RFI-CO-SS-0166 02 KAIG3-RFI-CO-SS-0166-02
KAIG3-RFI-CO-SS-0199 00 KAIG3-RFI-CO-SS-0199-00
KAIG3-RFI-TB-LC-0576 00 KAIG3-RFI-TB-LC-0576-00
KAIG3-RFI-TB-LC-0575 00 KAIG3-RFI-TB-LC-0575-00
KAIG3-RFI-TB-LC-0574 00 KAIG3-RFI-TB-LC-0574-00
KAIG3-RFI-TB-LC-0573 00 KAIG3-RFI-TB-LC-0573-00
KAIG3-RFI-PC-LC-0578 00 KAIG3-RFI-PC-LC-0578-00
KAIG3-RFI-PC-LC-0577 00 KAIG3-RFI-PC-LC-0577-00
KAIG3-RFI-TB-SU-2456 00 KAIG3-RFI-TB-SU-2456-00
KAIG3-RFI-ZG-C-5206 00 KAIG3-RFI-ZG-C-5206-00
KAIG3-RFI-SW-C-5202 00 KAIG3-RFI-SW-C-5202-00
KAIG3-RFI-WG-C-5201 00 KAIG3-RFI-WG-C-5201-00
KAIG3-RFI-WG-C-5200 00 KAIG3-RFI-WG-C-5200-00
KAIG3-RFI-SW-A-0824 00 KAIG3-RFI-SW-A-0824-00
KAIG3-RFI-SW-A-0823 00 KAIG3-RFI-SW-A-0823-00
KAIG3-RFI-SW-A-0822 00 KAIG3-RFI-SW-A-0822-00
KAIG3-RFI-PG-A-0821 00 KAIG3-RFI-PG-A-0821-00
KAIG3-RFI-TG-S-7319 00 KAIG3-RFI-TG-S-7319-00
KAIG3-RFI-PG-S-7318 00 KAIG3-RFI-PG-S-7318-00
KAIG3-RFI-PG-S-7317 00 KAIG3-RFI-PG-S-7317-00
KAIG3-RFI-PG-S-7316 00 KAIG3-RFI-PG-S-7316-00
KAIG3-RFI-SW-C-4863 00 KAIG3-RFI-SW-C-4863-00
KAIG3-RFI-SW-C-5205 00 KAIG3-RFI-SW-C-5205-00
KAIG3-RFI-SW-C-5204 00 KAIG3-RFI-SW-C-5204-00
KAIG3-RFI-SW-C-5203 00 KAIG3-RFI-SW-C-5203-00
KAIG3-RFI-SW-C-5196 00 KAIG3-RFI-SW-C-5196-00
KAIG3-RFI-SW-LS-1350 00 KAIG3-RFI-SW-LS-1350-00
KAIG3-RFI-CO-SS-0198 00 KAIG3-RFI-CO-SS-0198-00
KAIG3-RFI-CO-SU-2460 00 KAIG3-RFI-CO-SU-2460-00
KAIG3-RFI-CO-SU-2461 00 KAIG3-RFI-CO-SU-2461-00
KAIG3-RFI-MC-C-5183 00 KAIG3-RFI-MC-C-5183-00
KAIG3-RFI-MC-SU-2458 00 KAIG3-RFI-MC-SU-2458-00
KAIG3-RFI-CO-SU-2459 00 KAIG3-RFI-CO-SU-2459-00
KAIG3-RFI-PG-LS-1370 00 KAIG3-RFI-PG-LS-1370-00
KAIG3-RFI-TG-S-7312 00 KAIG3-RFI-TG-S-7312-00
KAIG3-RFI-MB-S-7311 00 KAIG3-RFI-MB-S-7311-00
KAIG3-RFI-WG-C-5189 00 KAIG3-RFI-WG-C-5189-00
KAIG3-RFI-WG-C-5188 00 KAIG3-RFI-WG-C-5188-00
KAIG3-RFI-SW-C-5187 00 KAIG3-RFI-SW-C-5187-00
KAIG3-RFI-EC-C-5186 00 KAIG3-RFI-EC-C-5186-00
KAIG3-RFI-SW-SU-2457 00 KAIG3-RFI-SW-SU-2457-00
KAIG3-RFI-SW-C-5195 00 KAIG3-RFI-SW-C-5195-00
KAIG3-RFI-SW-C-5194 00 KAIG3-RFI-SW-C-5194-00
KAIG3-RFI-SW-C-5193 00 KAIG3-RFI-SW-C-5193-00
KAIG3-RFI-SW-C-5192 00 KAIG3-RFI-SW-C-5192-00
KAIG3-RFI-SW-C-5191 00 KAIG3-RFI-SW-C-5191-00
KAIG3-RFI-SW-C-5190 00 KAIG3-RFI-SW-C-5190-00
KAIG3-RFI-SW-C-5185 00 KAIG3-RFI-SW-C-5185-00
KAIG3-RFI-SW-C-5184 00 KAIG3-RFI-SW-C-5184-00
KAIG3-RFI-SW-C-5182 00 KAIG3-RFI-SW-C-5182-00
KAIG3-RFI-SW-C-5181 00 KAIG3-RFI-SW-C-5181-00
KAIG3-RFI-SW-C-5180 00 KAIG3-RFI-SW-C-5180-00
KAIG3-RFI-SW-C-5179 00 KAIG3-RFI-SW-C-5179-00
KAIG3-RFI-SW-C-5178 00 KAIG3-RFI-SW-C-5178-00
KAIG3-RFI-SW-C-5177 00 KAIG3-RFI-SW-C-5177-00
KAIG3-RFI-SW-C-5176 00 KAIG3-RFI-SW-C-5176-00
KAIG3-RFI-SW-C-5175 00 KAIG3-RFI-SW-C-5175-00
KAIG3-RFI-CO-S-7305 00 KAIG3-RFI-CO-S-7305-00
KAIG3-RFI-CO-S-7306 00 KAIG3-RFI-CO-S-7306-00
KAIG3-RFI-CO-S-7307 00 KAIG3-RFI-CO-S-7307-00
KAIG3-RFI-CO-S-7308 00 KAIG3-RFI-CO-S-7308-00
KAIG3-RFI-CO-S-7309 00 KAIG3-RFI-CO-S-7309-00
KAIG3-RFI-CO-S-7310 00 KAIG3-RFI-CO-S-7310-00
KAIG3-RFI-CO-S-7301 00 KAIG3-RFI-CO-S-7301-00
KAIG3-RFI-CO-S-6786 00 KAIG3-RFI-CO-S-6786-00
KAIG3-RFI-CO-S-7290 00 KAIG3-RFI-CO-S-7290-00
KAIG3-RFI-MC-S-7298 00 KAIG3-RFI-MC-S-7298-00
KAIG3-RFI-MC-S-7299 00 KAIG3-RFI-MC-S-7299-00
KAIG3-RFI-MC-S-7300 00 KAIG3-RFI-MC-S-7300-00
KAIG3-RFI-CO-S-7302 00 KAIG3-RFI-CO-S-7302-00
KAIG3-RFI-CO-S-7304 00 KAIG3-RFI-CO-S-7304-00
KAIG3-RFI-CO-SS-0197 00 KAIG3-RFI-CO-SS-0197-00
KAIG3-RFI-LM-S-6791 01 KAIG3-RFI-LM-S-6791-01
KAIG3-RFI-MC-S-6967 01 KAIG3-RFI-MC-S-6967-01
KAIG3-RFI-CO-SU-2383 01 KAIG3-RFI-CO-SU-2383-01
KAIG3-RFI-CO-SU-2393 01 KAIG3-RFI-CO-SU-2393-01
KAIG3-RFI-SM-SU-2454 00 KAIG3-RFI-SM-SU-2454-00
KAIG3-RFI-MC-C-5163 00 KAIG3-RFI-MC-C-5163-00
KAIG3-RFI-CO-SS-0196 00 KAIG3-RFI-CO-SS-0196-00
KAIG3-RFI-CO-SS-0194 00 KAIG3-RFI-CO-SS-0194-00
KAIG3-RFI-SM-S-7241 00 KAIG3-RFI-SM-S-7241-00
KAIG3-RFI-SM-S-7297 00 KAIG3-RFI-SM-S-7297-00
KAIG3-RFI-CO-S-6771 00 KAIG3-RFI-CO-S-6771-00
KAIG3-RFI-CO-S-7287 00 KAIG3-RFI-CO-S-7287-00
KAIG3-RFI-CO-S-7295 00 KAIG3-RFI-CO-S-7295-00
KAIG3-RFI-CO-S-7288 00 KAIG3-RFI-CO-S-7288-00
KAIG3-RFI-CO-S-7289 00 KAIG3-RFI-CO-S-7289-00
KAIG3-RFI-SM-S-7291 00 KAIG3-RFI-SM-S-7291-00
KAIG3-RFI-LM-S-7296 00 KAIG3-RFI-LM-S-7296-00
KAIG3-RFI-TG-SU-2380
KAIG3-RFI-DG-C-5010
KAIG3-RFI-DG-C-5009
KAIG3-RFI-WG-C-5174
KAIG3-RFI-MB-A-0817
KAIG3-RFI-WG-A-0816
KAIG3-RFI-WG-A-0815
KAIG3-RFI-WG-A-0814
KAIG3-RFI-PT-A-0813
KAIG3-RFI-PG-S-7294
KAIG3-RFI-TB-S-7293
KAIG3-RFI-MC-C-5143
KAIG3-RFI-CO-SS-0195
KAIG3-RFI-PC-SU-2451
KAIG3-RFI-CO-SU-2454
KAIG3-RFI-TG-S-7050
KAIG3-RFI-PC-S-7278
KAIG3-RFI-PG-S-7153
KAIG3-RFI-PC-S-7279
KAIG3-RFI-CO-S-7281
KAIG3-RFI-CO-S-7283
KAIG3-RFI-CO-S-7285
KAIG3-RFI-CO-S-7286
KAIG3-RFI-SW-C-5171 00 KAIG3-RFI-SW-C-5171-00
KAIG3-RFI-SW-C-5170 00 KAIG3-RFI-SW-C-5170-00
KAIG3-RFI-SW-C-5169 00 KAIG3-RFI-SW-C-5169-00
KAIG3-RFI-SW-C-5168 00 KAIG3-RFI-SW-C-5168-00
KAIG3-RFI-SW-C-5167 00 KAIG3-RFI-SW-C-5167-00
KAIG3-RFI-SW-C-5166 00 KAIG3-RFI-SW-C-5166-00
KAIG3-RFI-SW-C-5165 00 KAIG3-RFI-SW-C-5165-00
KAIG3-RFI-SW-C-5164 00 KAIG3-RFI-SW-C-5164-00
KAIG3-RFI-TB-E-0451 00 KAIG3-RFI-TB-E-0451-00
KAIG3-RFI-SM-E-0450 00 KAIG3-RFI-SM-E-0450-00
KAIG3-RFI-LM-P-0223 00 KAIG3-RFI-LM-P-0223-00
KAIG3-RFI-LM-P-0222 00 KAIG3-RFI-LM-P-0222-00
KAIG3-RFI-PG-S-7284 00 KAIG3-RFI-PG-S-7284-00
KAIG3-RFI-PG-C-5019 01 KAIG3-RFI-PG-C-5019-01
KAIG3-RFI-WG-C-5159 00 KAIG3-RFI-WG-C-5159-00
KAIG3-RFI-WG-C-5158 00 KAIG3-RFI-WG-C-5158-00
KAIG3-RFI-PG-C-5157 00 KAIG3-RFI-PG-C-5157-00
KAIG3-RFI-SM-E-0449 00 KAIG3-RFI-SM-E-0449-00
KAIG3-RFI-WG-C-5156 00 KAIG3-RFI-WG-C-5156-00
KAIG3-RFI-WG-C-5155 00 KAIG3-RFI-WG-C-5155-00
KAIG3-RFI-EC-C-5154 00 KAIG3-RFI-EC-C-5154-00
KAIG3-RFI-PG-SU-2453 00 KAIG3-RFI-PG-SU-2453-00
KAIG3-RFI-WG-SU-2452 00 KAIG3-RFI-WG-SU-2452-00
KAIG3-RFI-TB-S-7257 00 KAIG3-RFI-TB-S-7257-00
KAIG3-RFI-SW-LS-1369 00 KAIG3-RFI-SW-LS-1369-00
KAIG3-RFI-SW-C-5162 00 KAIG3-RFI-SW-C-5162-00
KAIG3-RFI-SW-C-5153 00 KAIG3-RFI-SW-C-5153-00
KAIG3-RFI-SW-C-5152 00 KAIG3-RFI-SW-C-5152-00
KAIG3-RFI-SW-C-5151 00 KAIG3-RFI-SW-C-5151-00
KAIG3-RFI-SW-C-5150 00 KAIG3-RFI-SW-C-5150-00
KAIG3-RFI-SW-C-5149 00 KAIG3-RFI-SW-C-5149-00
KAIG3-RFI-SW-C-5148 00 KAIG3-RFI-SW-C-5148-00
KAIG3-RFI-SW-C-5147 00 KAIG3-RFI-SW-C-5147-00
KAIG3-RFI-SW-C-5146 00 KAIG3-RFI-SW-C-5146-00
KAIG3-RFI-SW-C-5145 00 KAIG3-RFI-SW-C-5145-00
KAIG3-RFI-SW-C-5144 00 KAIG3-RFI-SW-C-5144-00
KAIG3-RFI-ZG-LC-0572 00 KAIG3-RFI-ZG-LC-0572-00
KAIG3-RFI-ZG-LC-0571 00 KAIG3-RFI-ZG-LC-0571-00
KAIG3-RFI-SW-LC-0569 00 KAIG3-RFI-SW-LC-0569-00
KAIG3-RFI-SW-LC-0568 00 KAIG3-RFI-SW-LC-0568-00
KAIG3-RFI-SW-C-5161 00 KAIG3-RFI-SW-C-5161-00
KAIG3-RFI-SW-C-5129 00 KAIG3-RFI-SW-C-5129-00
KAIG3-RFI-SW-C-5160 00 KAIG3-RFI-SW-C-5160-00
KAIG3-RFI-SW-C-5128 00 KAIG3-RFI-SW-C-5128-00
KAIG3-RFI-WG-C-5141 00 KAIG3-RFI-WG-C-5141-00
KAIG3-RFI-TG-C-5140 00 KAIG3-RFI-TG-C-5140-00
KAIG3-RFI-WG-C-5139 00 KAIG3-RFI-WG-C-5139-00
KAIG3-RFI-WG-C-5138 00 KAIG3-RFI-WG-C-5138-00
KAIG3-RFI-WG-C-5137 00 KAIG3-RFI-WG-C-5137-00
KAIG3-RFI-WG-C-5125 00 KAIG3-RFI-WG-C-5125-00
KAIG3-RFI-SW-LS-1368 00 KAIG3-RFI-SW-LS-1368-00
KAIG3-RFI-SW-C-5136 00 KAIG3-RFI-SW-C-5136-00
KAIG3-RFI-WG-C-5123 00 KAIG3-RFI-WG-C-5123-00
KAIG3-RFI-SW-C-5135 00 KAIG3-RFI-SW-C-5135-00
KAIG3-RFI-MC-SU-2448 00 KAIG3-RFI-MC-SU-2448-00
KAIG3-RFI-SW-C-5134 00 KAIG3-RFI-SW-C-5134-00
KAIG3-RFI-WG-S-7277 00 KAIG3-RFI-WG-S-7277-00
KAIG3-RFI-SW-C-5133 00 KAIG3-RFI-SW-C-5133-00
KAIG3-RFI-SW-C-5132 00 KAIG3-RFI-SW-C-5132-00
KAIG3-RFI-CO-SU-2449 00 KAIG3-RFI-CO-SU-2449-00
KAIG3-RFI-SW-C-5131 00 KAIG3-RFI-SW-C-5131-00
KAIG3-RFI-CO-SU-2450 00 KAIG3-RFI-CO-SU-2450-00
KAIG3-RFI-WG-S-7276 00 KAIG3-RFI-WG-S-7276-00
KAIG3-RFI-SW-C-5127 00 KAIG3-RFI-SW-C-5127-00
KAIG3-RFI-SW-C-5126 00 KAIG3-RFI-SW-C-5126-00
KAIG3-RFI-TG-S-7275 00 KAIG3-RFI-TG-S-7275-00
KAIG3-RFI-WG-S-7274 00 KAIG3-RFI-WG-S-7274-00
KAIG3-RFI-TB-SU-2445 00 KAIG3-RFI-TB-SU-2445-00
KAIG3-RFI-CO-C-5130 00 KAIG3-RFI-CO-C-5130-00
KAIG3-RFI-MC-C-5142 00 KAIG3-RFI-MC-C-5142-00
KAIG3-RFI-CO-S-7264 00 KAIG3-RFI-CO-S-7264-00
KAIG3-RFI-CO-S-7265 00 KAIG3-RFI-CO-S-7265-00
KAIG3-RFI-CO-S-7266 00 KAIG3-RFI-CO-S-7266-00
KAIG3-RFI-MC-S-7267 00 KAIG3-RFI-MC-S-7267-00
KAIG3-RFI-MC-S-7268 00 KAIG3-RFI-MC-S-7268-00
KAIG3-RFI-MC-S-7269 00 KAIG3-RFI-MC-S-7269-00
KAIG3-RFI-CO-S-7270 00 KAIG3-RFI-CO-S-7270-00
KAIG3-RFI-CO-S-7271 00 KAIG3-RFI-CO-S-7271-00
KAIG3-RFI-CO-S-7272 00 KAIG3-RFI-CO-S-7272-00
KAIG3-RFI-MC-S-7273 00 KAIG3-RFI-MC-S-7273-00
KAIG3-RFI-SW-C-5024 00 KAIG3-RFI-SW-C-5024-00
KAIG3-RFI-CO-SS-0193 00 KAIG3-RFI-CO-SS-0193-00
KAIG3-RFI-CO-SS-0192 00 KAIG3-RFI-CO-SS-0192-00
KAIG3-RFI-CO-SS-0191 00 KAIG3-RFI-CO-SS-0191-00
KAIG3-RFI-CO-SS-0190 00 KAIG3-RFI-CO-SS-0190-00
KAIG3-RFI-CO-SS-0189 00 KAIG3-RFI-CO-SS-0189-00
KAIG3-RFI-CO-S-7236 00 KAIG3-RFI-CO-S-7236-00
KAIG3-RFI-CO-S-7149 00 KAIG3-RFI-CO-S-7149-00
KAIG3-RFI-CO-S-7103 00 KAIG3-RFI-CO-S-7103-00
KAIG3-RFI-CO-S-7096 00 KAIG3-RFI-CO-S-7096-00
KAIG3-RFI-CO-S-6872 00 KAIG3-RFI-CO-S-6872-00
KAIG3-RFI-MB-A-0812 00 KAIG3-RFI-MB-A-0812-00
KAIG3-RFI-MB-A-0811 00 KAIG3-RFI-MB-A-0811-00
KAIG3-RFI-TG-S-7260 00 KAIG3-RFI-TG-S-7260-00
KAIG3-RFI-TG-S-7259 00 KAIG3-RFI-TG-S-7259-00
KAIG3-RFI-WG-S-7258 00 KAIG3-RFI-WG-S-7258-00
KAIG3-RFI-TG-C-5122 00 KAIG3-RFI-TG-C-5122-00
KAIG3-RFI-SG-C-5120 00 KAIG3-RFI-SG-C-5120-00
KAIG3-RFI-SG-C-5119 00 KAIG3-RFI-SG-C-5119-00
KAIG3-RFI-WG-C-5104 00 KAIG3-RFI-WG-C-5104-00
KAIG3-RFI-EC-C-5096 00 KAIG3-RFI-EC-C-5096-00
KAIG3-RFI-SM-LC-0570 00 KAIG3-RFI-SM-LC-0570-00
KAIG3-RFI-ZG-E-0448 00 KAIG3-RFI-ZG-E-0448-00
KAIG3-RFI-SM-E-0446 00 KAIG3-RFI-SM-E-0446-00
KAIG3-RFI-SW-C-5124 00 KAIG3-RFI-SW-C-5124-00
KAIG3-RFI-SW-C-5117 00 KAIG3-RFI-SW-C-5117-00
KAIG3-RFI-SW-C-5116 00 KAIG3-RFI-SW-C-5116-00
KAIG3-RFI-SW-C-5115 00 KAIG3-RFI-SW-C-5115-00
KAIG3-RFI-SW-C-5114 00 KAIG3-RFI-SW-C-5114-00
KAIG3-RFI-AG-SS-0177 01 KAIG3-RFI-AG-SS-0177-01
KAIG3-RFI-AG-SS-0096 03 KAIG3-RFI-AG-SS-0096-03
KAIG3-RFI-SG-LS-1365 01 KAIG3-RFI-SG-LS-1365-01
KAIG3-RFI-SW-C-5023 00 KAIG3-RFI-SW-C-5023-00
KAIG3-RFI-SW-P-0220 00 KAIG3-RFI-SW-P-0220-00
KAIG3-RFI-CO-C-5118 00 KAIG3-RFI-CO-C-5118-00
KAIG3-RFI-CO-C-5066 00 KAIG3-RFI-CO-C-5066-00
KAIG3-RFI-VA-SU-2447 00 KAIG3-RFI-VA-SU-2447-00
KAIG3-RFI-SM-SU-2444 00 KAIG3-RFI-SM-SU-2444-00
KAIG3-RFI-LM-SU-2446 00 KAIG3-RFI-LM-SU-2446-00
KAIG3-RFI-LM-S-7261 00 KAIG3-RFI-LM-S-7261-00
KAIG3-RFI-LM-S-7262 00 KAIG3-RFI-LM-S-7262-00
KAIG3-RFI-CO-S-7251 00 KAIG3-RFI-CO-S-7251-00
KAIG3-RFI-CO-S-7256 00 KAIG3-RFI-CO-S-7256-00
KAIG3-RFI-MC-S-7238 00 KAIG3-RFI-MC-S-7238-00
KAIG3-RFI-MC-S-7239 00 KAIG3-RFI-MC-S-7239-00
KAIG3-RFI-MC-S-7240 00 KAIG3-RFI-MC-S-7240-00
KAIG3-RFI-MC-S-7243 00 KAIG3-RFI-MC-S-7243-00
KAIG3-RFI-MC-S-7244 00 KAIG3-RFI-MC-S-7244-00
KAIG3-RFI-MC-S-7245 00 KAIG3-RFI-MC-S-7245-00
KAIG3-RFI-CO-S-7246 00 KAIG3-RFI-CO-S-7246-00
KAIG3-RFI-CO-SS-0188 00 KAIG3-RFI-CO-SS-0188-00
KAIG3-RFI-CO-SS-0187 00 KAIG3-RFI-CO-SS-0187-00
KAIG3-RFI-CO-SS-0186 00 KAIG3-RFI-CO-SS-0186-00
KAIG3-RFI-CO-SS-0166 01 KAIG3-RFI-CO-SS-0166-01
KAIG3-RFI-SW-A-0810 00 KAIG3-RFI-SW-A-0810-00
KAIG3-RFI-SW-A-0809 00 KAIG3-RFI-SW-A-0809-00
KAIG3-RFI-SW-A-0808 00 KAIG3-RFI-SW-A-0808-00
KAIG3-RFI-SW-A-0807 00 KAIG3-RFI-SW-A-0807-00
KAIG3-RFI-WG-C-5103 00 KAIG3-RFI-WG-C-5103-00
KAIG3-RFI-TG-C-5102 00 KAIG3-RFI-TG-C-5102-00
KAIG3-RFI-TG-C-5101 00 KAIG3-RFI-TG-C-5101-00
KAIG3-RFI-TG-C-3863 01 KAIG3-RFI-TG-C-3863-01
KAIG3-RFI-WG-C-5100 00 KAIG3-RFI-WG-C-5100-00
KAIG3-RFI-WG-C-5099 00 KAIG3-RFI-WG-C-5099-00
KAIG3-RFI-WG-C-5098 00 KAIG3-RFI-WG-C-5098-00
KAIG3-RFI-WG-C-5097 00 KAIG3-RFI-WG-C-5097-00
KAIG3-RFI-WG-S-7249 00 KAIG3-RFI-WG-S-7249-00
KAIG3-RFI-TG-S-7248 00 KAIG3-RFI-TG-S-7248-00
KAIG3-RFI-TG-S-7247 00 KAIG3-RFI-TG-S-7247-00
KAIG3-RFI-WG-P-0219 00 KAIG3-RFI-WG-P-0219-00
KAIG3-RFI-MB-P-0188 01 KAIG3-RFI-MB-P-0188-01
KAIG3-RFI-SW-C-5108 00 KAIG3-RFI-SW-C-5108-00
KAIG3-RFI-SW-C-5107 00 KAIG3-RFI-SW-C-5107-00
KAIG3-RFI-WG-LS-1367 00 KAIG3-RFI-WG-LS-1367-00
KAIG3-RFI-SW-C-5113 00 KAIG3-RFI-SW-C-5113-00
KAIG3-RFI-SW-C-5112 00 KAIG3-RFI-SW-C-5112-00
KAIG3-RFI-SW-C-5111 00 KAIG3-RFI-SW-C-5111-00
KAIG3-RFI-SW-C-5110 00 KAIG3-RFI-SW-C-5110-00
KAIG3-RFI-SW-C-5109 00 KAIG3-RFI-SW-C-5109-00
KAIG3-RFI-SW-C-5106 00 KAIG3-RFI-SW-C-5106-00
KAIG3-RFI-SW-C-5105 00 KAIG3-RFI-SW-C-5105-00
KAIG3-RFI-SW-C-5075 00 KAIG3-RFI-SW-C-5075-00
KAIG3-RFI-SW-C-5073 00 KAIG3-RFI-SW-C-5073-00
KAIG3-RFI-SW-C-4802 00 KAIG3-RFI-SW-C-4802-00
KAIG3-RFI-TB-E-0447 00 KAIG3-RFI-TB-E-0447-00
KAIG3-RFI-PG-LC-0567 00 KAIG3-RFI-PG-LC-0567-00
KAIG3-RFI-CO-SU-2435 00 KAIG3-RFI-CO-SU-2435-00
KAIG3-RFI-CO-SU-2442 00 KAIG3-RFI-CO-SU-2442-00
KAIG3-RFI-MC-SU-2443 00 KAIG3-RFI-MC-SU-2443-00
KAIG3-RFI-CO-S-7186 00 KAIG3-RFI-CO-S-7186-00
KAIG3-RFI-CO-S-7234 00 KAIG3-RFI-CO-S-7234-00
KAIG3-RFI-CO-S-7208 00 KAIG3-RFI-CO-S-7208-00
KAIG3-RFI-CO-S-7235 00 KAIG3-RFI-CO-S-7235-00
KAIG3-RFI-MC-S-7203 00 KAIG3-RFI-MC-S-7203-00
KAIG3-RFI-WG-C-5095 00 KAIG3-RFI-WG-C-5095-00
KAIG3-RFI-EC-C-5094 00 KAIG3-RFI-EC-C-5094-00
KAIG3-RFI-PG-SU-2441 00 KAIG3-RFI-PG-SU-2441-00
KAIG3-RFI-PG-SU-2440 00 KAIG3-RFI-PG-SU-2440-00
KAIG3-RFI-MB-SU-2439 00 KAIG3-RFI-MB-SU-2439-00
KAIG3-RFI-PG-SU-2438 00 KAIG3-RFI-PG-SU-2438-00
KAIG3-RFI-PG-S-7242 00 KAIG3-RFI-PG-S-7242-00
KAIG3-RFI-PG-S-7233 00 KAIG3-RFI-PG-S-7233-00
KAIG3-RFI-MB-S-7232 00 KAIG3-RFI-MB-S-7232-00
KAIG3-RFI-MB-S-7231 00 KAIG3-RFI-MB-S-7231-00
KAIG3-RFI-PG-S-7230 00 KAIG3-RFI-PG-S-7230-00
KAIG3-RFI-WG-S-7229 00 KAIG3-RFI-WG-S-7229-00
KAIG3-RFI-WG-S-7228 00 KAIG3-RFI-WG-S-7228-00
KAIG3-RFI-SW-A-0806 00 KAIG3-RFI-SW-A-0806-00
KAIG3-RFI-SW-C-5093 00 KAIG3-RFI-SW-C-5093-00
KAIG3-RFI-SW-C-5067 00 KAIG3-RFI-SW-C-5067-00
KAIG3-RFI-SW-C-5064 00 KAIG3-RFI-SW-C-5064-00
KAIG3-RFI-SW-C-5052 00 KAIG3-RFI-SW-C-5052-00
KAIG3-RFI-SW-C-5051 00 KAIG3-RFI-SW-C-5051-00
KAIG3-RFI-SW-C-4801 00 KAIG3-RFI-SW-C-4801-00
KAIG3-RFI-SW-C-4800 00 KAIG3-RFI-SW-C-4800-00
KAIG3-RFI-SW-C-4799 00 KAIG3-RFI-SW-C-4799-00
KAIG3-RFI-SW-C-4798 00 KAIG3-RFI-SW-C-4798-00
KAIG3-RFI-CO-SS-0185 00 KAIG3-RFI-CO-SS-0185-00
KAIG3-RFI-CO-SU-2437 00 KAIG3-RFI-CO-SU-2437-00
KAIG3-RFI-SM-S-7216 00 KAIG3-RFI-SM-S-7216-00
KAIG3-RFI-CO-S-7218 00 KAIG3-RFI-CO-S-7218-00
KAIG3-RFI-LM-SU-2436 00 KAIG3-RFI-LM-SU-2436-00
KAIG3-RFI-LM-S-7220 00 KAIG3-RFI-LM-S-7220-00
KAIG3-RFI-LM-S-7221 00 KAIG3-RFI-LM-S-7221-00
KAIG3-RFI-SW-A-0627 01 KAIG3-RFI-SW-A-0627-01
KAIG3-RFI-SW-A-0626 01 KAIG3-RFI-SW-A-0626-01
KAIG3-RFI-SW-A-0617 01 KAIG3-RFI-SW-A-0617-01
KAIG3-RFI-WG-S-7227 00 KAIG3-RFI-WG-S-7227-00
KAIG3-RFI-WG-S-7226 00 KAIG3-RFI-WG-S-7226-00
KAIG3-RFI-PG-S-7214 00 KAIG3-RFI-PG-S-7214-00
KAIG3-RFI-WG-C-5050 01 KAIG3-RFI-WG-C-5050-01
KAIG3-RFI-ZG-C-5092 00 KAIG3-RFI-ZG-C-5092-00
KAIG3-RFI-WG-C-5091 00 KAIG3-RFI-WG-C-5091-00
KAIG3-RFI-SG-C-5087 00 KAIG3-RFI-SG-C-5087-00
KAIG3-RFI-SG-C-5086 00 KAIG3-RFI-SG-C-5086-00
KAIG3-RFI-CO-S-7223 00 KAIG3-RFI-CO-S-7223-00
KAIG3-RFI-CO-S-7224 00 KAIG3-RFI-CO-S-7224-00
KAIG3-RFI-SW-C-5090 00 KAIG3-RFI-SW-C-5090-00
KAIG3-RFI-SW-C-5089 00 KAIG3-RFI-SW-C-5089-00
KAIG3-RFI-SW-C-5088 00 KAIG3-RFI-SW-C-5088-00
KAIG3-RFI-SW-C-5085 00 KAIG3-RFI-SW-C-5085-00
KAIG3-RFI-SW-C-5076 00 KAIG3-RFI-SW-C-5076-00
KAIG3-RFI-SW-C-5074 00 KAIG3-RFI-SW-C-5074-00
KAIG3-RFI-SW-C-5072 00 KAIG3-RFI-SW-C-5072-00
KAIG3-RFI-SW-C-5071 00 KAIG3-RFI-SW-C-5071-00
KAIG3-RFI-CO-SS-0183 00 KAIG3-RFI-CO-SS-0183-00
KAIG3-RFI-CO-SU-2434 00 KAIG3-RFI-CO-SU-2434-00
KAIG3-RFI-CO-C-5080 00 KAIG3-RFI-CO-C-5080-00
KAIG3-RFI-PC-S-7193 00 KAIG3-RFI-PC-S-7193-00
KAIG3-RFI-PC-S-7195 00 KAIG3-RFI-PC-S-7195-00
KAIG3-RFI-PC-S-7196 00 KAIG3-RFI-PC-S-7196-00
KAIG3-RFI-PC-S-7194 00 KAIG3-RFI-PC-S-7194-00
KAIG3-RFI-MC-S-7207 00 KAIG3-RFI-MC-S-7207-00
KAIG3-RFI-CO-S-7209 00 KAIG3-RFI-CO-S-7209-00
KAIG3-RFI-CO-S-7213 00 KAIG3-RFI-CO-S-7213-00
KAIG3-RFI-CO-S-7210 00 KAIG3-RFI-CO-S-7210-00
KAIG3-RFI-SW-LC-0504 01 KAIG3-RFI-SW-LC-0504-01
KAIG3-RFI-SW-LC-0503 01 KAIG3-RFI-SW-LC-0503-01
KAIG3-RFI-WG-C-5084 00 KAIG3-RFI-WG-C-5084-00
KAIG3-RFI-EC-C-5083 00 KAIG3-RFI-EC-C-5083-00
KAIG3-RFI-SG-C-5079 00 KAIG3-RFI-SG-C-5079-00
KAIG3-RFI-SG-C-5078 00 KAIG3-RFI-SG-C-5078-00
KAIG3-RFI-TG-C-5077 00 KAIG3-RFI-TG-C-5077-00
KAIG3-RFI-PG-S-7212 00 KAIG3-RFI-PG-S-7212-00
KAIG3-RFI-TB-S-7211 00 KAIG3-RFI-TB-S-7211-00
KAIG3-RFI-WG-S-7202 00 KAIG3-RFI-WG-S-7202-00
KAIG3-RFI-TB-SU-2433 00 KAIG3-RFI-TB-SU-2433-00
KAIG3-RFI-WG-SU-2431 00 KAIG3-RFI-WG-SU-2431-00
KAIG3-RFI-SW-C-5082 00 KAIG3-RFI-SW-C-5082-00
KAIG3-RFI-SW-C-5081 00 KAIG3-RFI-SW-C-5081-00
KAIG3-RFI-MC-C-5065 00 KAIG3-RFI-MC-C-5065-00
KAIG3-RFI-CO-SS-0179 00 KAIG3-RFI-CO-SS-0179-00
KAIG3-RFI-CO-SS-0168 01 KAIG3-RFI-CO-SS-0168-01
KAIG3-RFI-CO-SS-0181 00 KAIG3-RFI-CO-SS-0181-00
KAIG3-RFI-CO-SS-0182 00 KAIG3-RFI-CO-SS-0182-00
KAIG3-RFI-LM-SU-2432 00 KAIG3-RFI-LM-SU-2432-00
KAIG3-RFI-CO-SU-2428 00 KAIG3-RFI-CO-SU-2428-00
KAIG3-RFI-CO-SU-2429 00 KAIG3-RFI-CO-SU-2429-00
KAIG3-RFI-MC-SU-2430 00 KAIG3-RFI-MC-SU-2430-00
KAIG3-RFI-CO-S-7189 00 KAIG3-RFI-CO-S-7189-00
KAIG3-RFI-CO-S-7190 00 KAIG3-RFI-CO-S-7190-00
KAIG3-RFI-CO-S-7191 00 KAIG3-RFI-CO-S-7191-00
KAIG3-RFI-CO-S-7192 00 KAIG3-RFI-CO-S-7192-00
KAIG3-RFI-MC-S-7197 00 KAIG3-RFI-MC-S-7197-00
KAIG3-RFI-MC-S-7198 00 KAIG3-RFI-MC-S-7198-00
KAIG3-RFI-LM-S-7204 00 KAIG3-RFI-LM-S-7204-00
KAIG3-RFI-SG-LS-1366 00 KAIG3-RFI-SG-LS-1366-00
KAIG3-RFI-WG-C-5070 00 KAIG3-RFI-WG-C-5070-00
KAIG3-RFI-WG-C-5069 00 KAIG3-RFI-WG-C-5069-00
KAIG3-RFI-TG-C-5020 01 KAIG3-RFI-TG-C-5020-01
KAIG3-RFI-ZG-C-5068 00 KAIG3-RFI-ZG-C-5068-00
KAIG3-RFI-WG-C-5057 00 KAIG3-RFI-WG-C-5057-00
KAIG3-RFI-SG-A-0805 00 KAIG3-RFI-SG-A-0805-00
KAIG3-RFI-TT-A-0804 00 KAIG3-RFI-TT-A-0804-00
KAIG3-RFI-TB-SS-0184 00 KAIG3-RFI-TB-SS-0184-00
KAIG3-RFI-PG-S-7201 00 KAIG3-RFI-PG-S-7201-00
KAIG3-RFI-WG-S-7200 00 KAIG3-RFI-WG-S-7200-00
KAIG3-RFI-WG-S-7199 00 KAIG3-RFI-WG-S-7199-00
KAIG3-RFI-CO-SS-0178 00 KAIG3-RFI-CO-SS-0178-00
KAIG3-RFI-CO-C-5060 00 KAIG3-RFI-CO-C-5060-00
KAIG3-RFI-SM-S-7187 00 KAIG3-RFI-SM-S-7187-00
KAIG3-RFI-CF-S-7184 00 KAIG3-RFI-CF-S-7184-00
KAIG3-RFI-LM-S-7185 00 KAIG3-RFI-LM-S-7185-00
KAIG3-RFI-CO-S-7072 00 KAIG3-RFI-CO-S-7072-00
KAIG3-RFI-CO-S-7120 00 KAIG3-RFI-CO-S-7120-00
KAIG3-RFI-CO-S-7188 00 KAIG3-RFI-CO-S-7188-00
KAIG3-RFI-WG-S-7183 00 KAIG3-RFI-WG-S-7183-00
KAIG3-RFI-WG-S-7182 00 KAIG3-RFI-WG-S-7182-00
KAIG3-RFI-WG-S-7181 00 KAIG3-RFI-WG-S-7181-00
KAIG3-RFI-WG-S-7180 00 KAIG3-RFI-WG-S-7180-00
KAIG3-RFI-WG-S-7179 00 KAIG3-RFI-WG-S-7179-00
KAIG3-RFI-WG-S-7178 00 KAIG3-RFI-WG-S-7178-00
KAIG3-RFI-WG-C-5056 00 KAIG3-RFI-WG-C-5056-00
KAIG3-RFI-WG-C-5050 00 KAIG3-RFI-WG-C-5050-00
KAIG3-RFI-MB-A-0803 00 KAIG3-RFI-MB-A-0803-00
KAIG3-RFI-TB-LC-0566 00 KAIG3-RFI-TB-LC-0566-00
KAIG3-RFI-SW-C-5063 00 KAIG3-RFI-SW-C-5063-00
KAIG3-RFI-SW-C-5062 00 KAIG3-RFI-SW-C-5062-00
KAIG3-RFI-SW-C-5061 00 KAIG3-RFI-SW-C-5061-00
KAIG3-RFI-SW-C-5059 00 KAIG3-RFI-SW-C-5059-00
KAIG3-RFI-SW-C-5058 00 KAIG3-RFI-SW-C-5058-00
KAIG3-RFI-SW-C-5055 00 KAIG3-RFI-SW-C-5055-00
KAIG3-RFI-SW-C-5054 00 KAIG3-RFI-SW-C-5054-00
KAIG3-RFI-SW-C-5053 00 KAIG3-RFI-SW-C-5053-00
KAIG3-RFI-SW-C-5048 00 KAIG3-RFI-SW-C-5048-00
KAIG3-RFI-WG-C-4469 01 KAIG3-RFI-WG-C-4469-01
KAIG3-RFI-WG-C-5049 00 KAIG3-RFI-WG-C-5049-00
KAIG3-RFI-WG-C-5045 00 KAIG3-RFI-WG-C-5045-00
KAIG3-RFI-ZG-C-5044 00 KAIG3-RFI-ZG-C-5044-00
KAIG3-RFI-WG-C-5040 00 KAIG3-RFI-WG-C-5040-00
KAIG3-RFI-WG-C-5039 00 KAIG3-RFI-WG-C-5039-00
KAIG3-RFI-ZG-A-0802 00 KAIG3-RFI-ZG-A-0802-00
KAIG3-RFI-MB-A-0801 00 KAIG3-RFI-MB-A-0801-00
KAIG3-RFI-MB-A-0800 00 KAIG3-RFI-MB-A-0800-00
KAIG3-RFI-PG-S-7174 00 KAIG3-RFI-PG-S-7174-00
KAIG3-RFI-SG-S-7173 00 KAIG3-RFI-SG-S-7173-00
KAIG3-RFI-PG-S-7172 00 KAIG3-RFI-PG-S-7172-00
KAIG3-RFI-ZG-S-7171 00 KAIG3-RFI-ZG-S-7171-00
KAIG3-RFI-CO-SS-0180 00 KAIG3-RFI-CO-SS-0180-00
KAIG3-RFI-CO-SU-2427 00 KAIG3-RFI-CO-SU-2427-00
KAIG3-RFI-CO-C-5038 00 KAIG3-RFI-CO-C-5038-00
KAIG3-RFI-LM-C-5034 00 KAIG3-RFI-LM-C-5034-00
KAIG3-RFI-CO-S-7176 00 KAIG3-RFI-CO-S-7176-00
KAIG3-RFI-CO-S-7175 00 KAIG3-RFI-CO-S-7175-00
KAIG3-RFI-CO-S-7170 00 KAIG3-RFI-CO-S-7170-00
KAIG3-RFI-CO-S-7167 00 KAIG3-RFI-CO-S-7167-00
KAIG3-RFI-CO-S-7168 00 KAIG3-RFI-CO-S-7168-00
KAIG3-RFI-CO-S-7169 00 KAIG3-RFI-CO-S-7169-00
KAIG3-RFI-CO-S-7158 00 KAIG3-RFI-CO-S-7158-00
KAIG3-RFI-CO-S-7157 00 KAIG3-RFI-CO-S-7157-00
KAIG3-RFI-SW-C-5047 00 KAIG3-RFI-SW-C-5047-00
KAIG3-RFI-SW-C-5046 00 KAIG3-RFI-SW-C-5046-00
KAIG3-RFI-SW-C-5043 00 KAIG3-RFI-SW-C-5043-00
KAIG3-RFI-SW-C-5042 00 KAIG3-RFI-SW-C-5042-00
KAIG3-RFI-SW-C-5041 00 KAIG3-RFI-SW-C-5041-00
KAIG3-RFI-AG-SS-0177 00 KAIG3-RFI-AG-SS-0177-00
KAIG3-RFI-MB-A-0799 00 KAIG3-RFI-MB-A-0799-00
KAIG3-RFI-WG-C-5037 00 KAIG3-RFI-WG-C-5037-00
KAIG3-RFI-WG-C-5036 00 KAIG3-RFI-WG-C-5036-00
KAIG3-RFI-WG-C-5032 00 KAIG3-RFI-WG-C-5032-00
KAIG3-RFI-TG-C-5020 00 KAIG3-RFI-TG-C-5020-00
KAIG3-RFI-WG-C-4987 01 KAIG3-RFI-WG-C-4987-01
KAIG3-RFI-SG-S-7162 00 KAIG3-RFI-SG-S-7162-00
KAIG3-RFI-WG-S-7161 00 KAIG3-RFI-WG-S-7161-00
KAIG3-RFI-ZG-S-7160 00 KAIG3-RFI-ZG-S-7160-00
KAIG3-RFI-TG-S-7159 00 KAIG3-RFI-TG-S-7159-00
KAIG3-RFI-MB-E-0445 00 KAIG3-RFI-MB-E-0445-00
KAIG3-RFI-MB-E-0444 00 KAIG3-RFI-MB-E-0444-00
KAIG3-RFI-CO-C-5035 00 KAIG3-RFI-CO-C-5035-00
KAIG3-RFI-CO-C-5033 00 KAIG3-RFI-CO-C-5033-00
KAIG3-RFI-CO-SU-2426 00 KAIG3-RFI-CO-SU-2426-00
KAIG3-RFI-CO-S-7166 00 KAIG3-RFI-CO-S-7166-00
KAIG3-RFI-CO-S-7165 00 KAIG3-RFI-CO-S-7165-00
KAIG3-RFI-MC-S-7164 00 KAIG3-RFI-MC-S-7164-00
KAIG3-RFI-MC-S-7163 00 KAIG3-RFI-MC-S-7163-00
KAIG3-RFI-MC-S-7084 00 KAIG3-RFI-MC-S-7084-00
KAIG3-RFI-CO-SS-0174 00 KAIG3-RFI-CO-SS-0174-00
KAIG3-RFI-CO-SS-0172 00 KAIG3-RFI-CO-SS-0172-00
KAIG3-RFI-CO-SS-0175 00 KAIG3-RFI-CO-SS-0175-00
KAIG3-RFI-CO-SS-0139 00 KAIG3-RFI-CO-SS-0139-00
KAIG3-RFI-CO-SS-0176 00 KAIG3-RFI-CO-SS-0176-00
KAIG3-RFI-PG-S-7137 00 KAIG3-RFI-PG-S-7137-00
KAIG3-RFI-SW-C-5029 00 KAIG3-RFI-SW-C-5029-00
KAIG3-RFI-SW-C-5028 00 KAIG3-RFI-SW-C-5028-00
KAIG3-RFI-SW-C-5027 00 KAIG3-RFI-SW-C-5027-00
KAIG3-RFI-SW-C-5026 00 KAIG3-RFI-SW-C-5026-00
KAIG3-RFI-SW-C-5025 00 KAIG3-RFI-SW-C-5025-00
KAIG3-RFI-SW-C-5018 00 KAIG3-RFI-SW-C-5018-00
KAIG3-RFI-TG-SS-0169 00 KAIG3-RFI-TG-SS-0169-00
KAIG3-RFI-CO-SS-0170 00 KAIG3-RFI-CO-SS-0170-00
KAIG3-RFI-CO-SS-0171 00 KAIG3-RFI-CO-SS-0171-00
KAIG3-RFI-CO-SS-0168 00 KAIG3-RFI-CO-SS-0168-00
KAIG3-RFI-CO-C-4984 00 KAIG3-RFI-CO-C-4984-00
KAIG3-RFI-CO-SU-2423 00 KAIG3-RFI-CO-SU-2423-00
KAIG3-RFI-LM-SU-2424 00 KAIG3-RFI-LM-SU-2424-00
KAIG3-RFI-LM-S-7155 00 KAIG3-RFI-LM-S-7155-00
KAIG3-RFI-CO-S-7148 00 KAIG3-RFI-CO-S-7148-00
KAIG3-RFI-CO-S-7151 00 KAIG3-RFI-CO-S-7151-00
KAIG3-RFI-LM-S-7154 00 KAIG3-RFI-LM-S-7154-00
KAIG3-RFI-CO-S-7150 00 KAIG3-RFI-CO-S-7150-00
KAIG3-RFI-CO-SS-0167 00 KAIG3-RFI-CO-SS-0167-00
KAIG3-RFI-CO-SS-0134 00 KAIG3-RFI-CO-SS-0134-00
KAIG3-RFI-ZG-A-0798 00 KAIG3-RFI-ZG-A-0798-00
KAIG3-RFI-PG-S-7153 00 KAIG3-RFI-PG-S-7153-00
KAIG3-RFI-PG-S-7152 00 KAIG3-RFI-PG-S-7152-00
KAIG3-RFI-WG-C-5022 00 KAIG3-RFI-WG-C-5022-00
KAIG3-RFI-DG-C-5021 00 KAIG3-RFI-DG-C-5021-00
KAIG3-RFI-PG-C-5019 00 KAIG3-RFI-PG-C-5019-00
KAIG3-RFI-WG-C-5013 00 KAIG3-RFI-WG-C-5013-00
KAIG3-RFI-LM-LC-0564 00 KAIG3-RFI-LM-LC-0564-00
KAIG3-RFI-MB-LC-0313 01 KAIG3-RFI-MB-LC-0313-01
KAIG3-RFI-SW-C-5017 00 KAIG3-RFI-SW-C-5017-00
KAIG3-RFI-SW-C-5016 00 KAIG3-RFI-SW-C-5016-00
KAIG3-RFI-SW-C-5015 00 KAIG3-RFI-SW-C-5015-00
KAIG3-RFI-SW-C-5014 00 KAIG3-RFI-SW-C-5014-00
KAIG3-RFI-SW-C-5007 00 KAIG3-RFI-SW-C-5007-00
KAIG3-RFI-MB-LC-0565 00 KAIG3-RFI-MB-LC-0565-00
KAIG3-RFI-DG-LC-0563 00 KAIG3-RFI-DG-LC-0563-00
KAIG3-RFI-TG-SS-0161 00 KAIG3-RFI-TG-SS-0161-00
KAIG3-RFI-AG-SS-0096 02 KAIG3-RFI-AG-SS-0096-02
KAIG3-RFI-CO-S-6957 00 KAIG3-RFI-CO-S-6957-00
KAIG3-RFI-SW-C-5002 00 KAIG3-RFI-SW-C-5002-00
KAIG3-RFI-SW-C-5000 00 KAIG3-RFI-SW-C-5000-00
KAIG3-RFI-SW-C-4999 00 KAIG3-RFI-SW-C-4999-00
KAIG3-RFI-SW-C-4998 00 KAIG3-RFI-SW-C-4998-00
KAIG3-RFI-MB-A-0797 00 KAIG3-RFI-MB-A-0797-00
KAIG3-RFI-WG-C-5012 00 KAIG3-RFI-WG-C-5012-00
KAIG3-RFI-DG-C-5011 00 KAIG3-RFI-DG-C-5011-00
KAIG3-RFI-DG-C-5010 00 KAIG3-RFI-DG-C-5010-00
KAIG3-RFI-DG-C-5009 00 KAIG3-RFI-DG-C-5009-00
KAIG3-RFI-MB-C-5001 00 KAIG3-RFI-MB-C-5001-00
KAIG3-RFI-TG-S-7144 00 KAIG3-RFI-TG-S-7144-00
KAIG3-RFI-ZG-S-7143 00 KAIG3-RFI-ZG-S-7143-00
KAIG3-RFI-TG-S-7142 00 KAIG3-RFI-TG-S-7142-00
KAIG3-RFI-TG-S-7141 00 KAIG3-RFI-TG-S-7141-00
KAIG3-RFI-TG-S-7139 00 KAIG3-RFI-TG-S-7139-00
KAIG3-RFI-TG-S-7138 00 KAIG3-RFI-TG-S-7138-00
KAIG3-RFI-TG-S-6502 01 KAIG3-RFI-TG-S-6502-01
KAIG3-RFI-WG-LS-1364 00 KAIG3-RFI-WG-LS-1364-00
KAIG3-RFI-SW-P-0214 01 KAIG3-RFI-SW-P-0214-01
KAIG3-RFI-SG-LS-1365 00 KAIG3-RFI-SG-LS-1365-00
KAIG3-RFI-SW-C-5006 00 KAIG3-RFI-SW-C-5006-00
KAIG3-RFI-SW-C-5005 00 KAIG3-RFI-SW-C-5005-00
KAIG3-RFI-SW-C-5004 00 KAIG3-RFI-SW-C-5004-00
KAIG3-RFI-SW-C-5003 00 KAIG3-RFI-SW-C-5003-00
KAIG3-RFI-SW-SU-2422 00 KAIG3-RFI-SW-SU-2422-00
KAIG3-RFI-SW-SU-2421 00 KAIG3-RFI-SW-SU-2421-00
KAIG3-RFI-SW-SU-2420 00 KAIG3-RFI-SW-SU-2420-00
KAIG3-RFI-PC-LC-0554 01 KAIG3-RFI-PC-LC-0554-01
KAIG3-RFI-PC-LC-0553-01 00 KAIG3-RFI-PC-LC-0553-01-00
KAIG3-RFI-CO-SU-2419 00 KAIG3-RFI-CO-SU-2419-00
KAIG3-RFI-CO-SU-2416 00 KAIG3-RFI-CO-SU-2416-00
KAIG3-RFI-CO-SU-2417 00 KAIG3-RFI-CO-SU-2417-00
KAIG3-RFI-CO-S-7146 00 KAIG3-RFI-CO-S-7146-00
KAIG3-RFI-CO-S-7130 00 KAIG3-RFI-CO-S-7130-00
KAIG3-RFI-CO-S-7132 00 KAIG3-RFI-CO-S-7132-00
KAIG3-RFI-CO-S-7133 00 KAIG3-RFI-CO-S-7133-00
KAIG3-RFI-MC-C-4983 00 KAIG3-RFI-MC-C-4983-00
KAIG3-RFI-MC-C-5008 00 KAIG3-RFI-MC-C-5008-00
KAIG3-RFI-SW-E-0433 01 KAIG3-RFI-SW-E-0433-01
KAIG3-RFI-MB-A-0796 00 KAIG3-RFI-MB-A-0796-00
KAIG3-RFI-MB-A-0795 00 KAIG3-RFI-MB-A-0795-00
KAIG3-RFI-MB-A-0794 00 KAIG3-RFI-MB-A-0794-00
KAIG3-RFI-ZG-SU-2418 00 KAIG3-RFI-ZG-SU-2418-00
KAIG3-RFI-WG-C-4805 01 KAIG3-RFI-WG-C-4805-01
KAIG3-RFI-WG-C-4667 01 KAIG3-RFI-WG-C-4667-01
KAIG3-RFI-WG-C-4993 00 KAIG3-RFI-WG-C-4993-00
KAIG3-RFI-WG-C-4992 00 KAIG3-RFI-WG-C-4992-00
KAIG3-RFI-PG-S-7136 00 KAIG3-RFI-PG-S-7136-00
KAIG3-RFI-ZG-S-7135 00 KAIG3-RFI-ZG-S-7135-00
KAIG3-RFI-SG-S-7134 00 KAIG3-RFI-SG-S-7134-00
KAIG3-RFI-TG-LS-1359 00 KAIG3-RFI-TG-LS-1359-00
KAIG3-RFI-LM-E-0443 00 KAIG3-RFI-LM-E-0443-00
KAIG3-RFI-LM-E-0442 00 KAIG3-RFI-LM-E-0442-00
KAIG3-RFI-PC-LC-0555 01 KAIG3-RFI-PC-LC-0555-01
KAIG3-RFI-SW-C-4995 00 KAIG3-RFI-SW-C-4995-00
KAIG3-RFI-SW-C-4994 00 KAIG3-RFI-SW-C-4994-00
KAIG3-RFI-WG-LS-1363 00 KAIG3-RFI-WG-LS-1363-00
KAIG3-RFI-PC-LC-0524 01 KAIG3-RFI-PC-LC-0524-01
KAIG3-RFI-WG-P-0218 00 KAIG3-RFI-WG-P-0218-00
KAIG3-RFI-PC-LC-0522 01 KAIG3-RFI-PC-LC-0522-01
KAIG3-RFI-PC-LC-0521 01 KAIG3-RFI-PC-LC-0521-01
KAIG3-RFI-SW-C-4991 00 KAIG3-RFI-SW-C-4991-00
KAIG3-RFI-SW-C-4990 00 KAIG3-RFI-SW-C-4990-00
KAIG3-RFI-SW-C-4989 00 KAIG3-RFI-SW-C-4989-00
KAIG3-RFI-SW-C-4980 00 KAIG3-RFI-SW-C-4980-00
KAIG3-RFI-SW-C-4979 00 KAIG3-RFI-SW-C-4979-00
KAIG3-RFI-MC-S-7140 00 KAIG3-RFI-MC-S-7140-00
KAIG3-RFI-MC-C-4997 00 KAIG3-RFI-MC-C-4997-00
KAIG3-RFI-CO-C-4996 00 KAIG3-RFI-CO-C-4996-00
KAIG3-RFI-MC-SU-2327 01 KAIG3-RFI-MC-SU-2327-01
KAIG3-RFI-MC-S-6712 01 KAIG3-RFI-MC-S-6712-01
KAIG3-RFI-MC-S-6713 01 KAIG3-RFI-MC-S-6713-01
KAIG3-RFI-CO-SS-0166 00 KAIG3-RFI-CO-SS-0166-00
KAIG3-RFI-CO-SS-0165 00 KAIG3-RFI-CO-SS-0165-00
KAIG3-RFI-CO-SS-0164 00 KAIG3-RFI-CO-SS-0164-00
KAIG3-RFI-WG-LS-1362 00 KAIG3-RFI-WG-LS-1362-00
KAIG3-RFI-TG-S-7124 00 KAIG3-RFI-TG-S-7124-00
KAIG3-RFI-PG-S-7123 00 KAIG3-RFI-PG-S-7123-00
KAIG3-RFI-PG-S-7122 00 KAIG3-RFI-PG-S-7122-00
KAIG3-RFI-PG-S-7121 00 KAIG3-RFI-PG-S-7121-00
KAIG3-RFI-PG-SU-2413 00 KAIG3-RFI-PG-SU-2413-00
KAIG3-RFI-PG-SU-2412 00 KAIG3-RFI-PG-SU-2412-00
KAIG3-RFI-EC-C-4988 00 KAIG3-RFI-EC-C-4988-00
KAIG3-RFI-WG-C-4987 00 KAIG3-RFI-WG-C-4987-00
KAIG3-RFI-WG-C-4986 00 KAIG3-RFI-WG-C-4986-00
KAIG3-RFI-WG-C-4985 00 KAIG3-RFI-WG-C-4985-00
KAIG3-RFI-PG-C-4971 00 KAIG3-RFI-PG-C-4971-00
KAIG3-RFI-WG-C-4981 00 KAIG3-RFI-WG-C-4981-00
KAIG3-RFI-DG-E-0441 00 KAIG3-RFI-DG-E-0441-00
KAIG3-RFI-SW-E-0432 01 KAIG3-RFI-SW-E-0432-01
KAIG3-RFI-DG-LC-0562 00 KAIG3-RFI-DG-LC-0562-00
KAIG3-RFI-CO-SS-0163 00 KAIG3-RFI-CO-SS-0163-00
KAIG3-RFI-CO-SS-0137 01 KAIG3-RFI-CO-SS-0137-01
KAIG3-RFI-MC-SU-2415 00 KAIG3-RFI-MC-SU-2415-00
KAIG3-RFI-CO-SU-2414 00 KAIG3-RFI-CO-SU-2414-00
KAIG3-RFI-CO-C-4982 00 KAIG3-RFI-CO-C-4982-00
KAIG3-RFI-SW-LS-1361 00 KAIG3-RFI-SW-LS-1361-00
KAIG3-RFI-SW-C-4978 00 KAIG3-RFI-SW-C-4978-00
KAIG3-RFI-SW-C-4977 00 KAIG3-RFI-SW-C-4977-00
KAIG3-RFI-SW-C-4976 00 KAIG3-RFI-SW-C-4976-00
KAIG3-RFI-SW-C-4975 00 KAIG3-RFI-SW-C-4975-00
KAIG3-RFI-SW-C-4974 00 KAIG3-RFI-SW-C-4974-00
KAIG3-RFI-SW-C-4973 00 KAIG3-RFI-SW-C-4973-00
KAIG3-RFI-SW-C-4972 00 KAIG3-RFI-SW-C-4972-00
KAIG3-RFI-SW-C-4965 00 KAIG3-RFI-SW-C-4965-00
KAIG3-RFI-SW-C-4934 00 KAIG3-RFI-SW-C-4934-00
KAIG3-RFI-MC-S-7128 00 KAIG3-RFI-MC-S-7128-00
KAIG3-RFI-TG-SS-0146 01 KAIG3-RFI-TG-SS-0146-01
KAIG3-RFI-MC-S-7129 00 KAIG3-RFI-MC-S-7129-00
KAIG3-RFI-CO-S-6999 00 KAIG3-RFI-CO-S-6999-00
KAIG3-RFI-CO-S-7125 00 KAIG3-RFI-CO-S-7125-00
KAIG3-RFI-CO-S-7126 00 KAIG3-RFI-CO-S-7126-00
KAIG3-RFI-MC-S-7127 00 KAIG3-RFI-MC-S-7127-00
KAIG3-RFI-MB-A-0793 00 KAIG3-RFI-MB-A-0793-00
KAIG3-RFI-TG-S-7117 00 KAIG3-RFI-TG-S-7117-00
KAIG3-RFI-MB-S-7112 00 KAIG3-RFI-MB-S-7112-00
KAIG3-RFI-MB-S-7111 00 KAIG3-RFI-MB-S-7111-00
KAIG3-RFI-TG-S-7110 00 KAIG3-RFI-TG-S-7110-00
KAIG3-RFI-TG-S-7109 00 KAIG3-RFI-TG-S-7109-00
KAIG3-RFI-TG-S-7108 00 KAIG3-RFI-TG-S-7108-00
KAIG3-RFI-WG-C-4970 00 KAIG3-RFI-WG-C-4970-00
KAIG3-RFI-WG-C-4957 00 KAIG3-RFI-WG-C-4957-00
KAIG3-RFI-SW-LS-1357 00 KAIG3-RFI-SW-LS-1357-00
KAIG3-RFI-SW-C-4964 00 KAIG3-RFI-SW-C-4964-00
KAIG3-RFI-SW-C-4963 00 KAIG3-RFI-SW-C-4963-00
KAIG3-RFI-SW-C-4962 00 KAIG3-RFI-SW-C-4962-00
KAIG3-RFI-SW-C-4961 00 KAIG3-RFI-SW-C-4961-00
KAIG3-RFI-SW-C-4960 00 KAIG3-RFI-SW-C-4960-00
KAIG3-RFI-SW-C-4959 00 KAIG3-RFI-SW-C-4959-00
KAIG3-RFI-SW-C-4941 00 KAIG3-RFI-SW-C-4941-00
KAIG3-RFI-SW-C-4917 00 KAIG3-RFI-SW-C-4917-00
KAIG3-RFI-SW-E-0440 00 KAIG3-RFI-SW-E-0440-00
KAIG3-RFI-LM-LC-0561 00 KAIG3-RFI-LM-LC-0561-00
KAIG3-RFI-LM-LC-0560 00 KAIG3-RFI-LM-LC-0560-00
KAIG3-RFI-PC-LC-0559 00 KAIG3-RFI-PC-LC-0559-00
KAIG3-RFI-CO-C-4966 00 KAIG3-RFI-CO-C-4966-00
KAIG3-RFI-SW-P-0217 00 KAIG3-RFI-SW-P-0217-00
KAIG3-RFI-CO-C-4968 00 KAIG3-RFI-CO-C-4968-00
KAIG3-RFI-MC-C-4967 00 KAIG3-RFI-MC-C-4967-00
KAIG3-RFI-CO-S-7118 00 KAIG3-RFI-CO-S-7118-00
KAIG3-RFI-MC-S-7113 00 KAIG3-RFI-MC-S-7113-00
KAIG3-RFI-LM-S-7114 00 KAIG3-RFI-LM-S-7114-00
KAIG3-RFI-LM-S-7115 00 KAIG3-RFI-LM-S-7115-00
KAIG3-RFI-CO-S-7119 00 KAIG3-RFI-CO-S-7119-00
KAIG3-RFI-LM-SU-2410 00 KAIG3-RFI-LM-SU-2410-00
KAIG3-RFI-SW-LS-1360 00 KAIG3-RFI-SW-LS-1360-00
KAIG3-RFI-CO-SU-2411 00 KAIG3-RFI-CO-SU-2411-00
KAIG3-RFI-CO-SS-0162 00 KAIG3-RFI-CO-SS-0162-00
KAIG3-RFI-SW-LS-1358 00 KAIG3-RFI-SW-LS-1358-00
KAIG3-RFI-CO-SS-0157 00 KAIG3-RFI-CO-SS-0157-00
KAIG3-RFI-TG-SS-0119 01 KAIG3-RFI-TG-SS-0119-01
KAIG3-RFI-TG-SS-0160 00 KAIG3-RFI-TG-SS-0160-00
KAIG3-RFI-SW-E-0438 00 KAIG3-RFI-SW-E-0438-00
KAIG3-RFI-WG-C-4806 01 KAIG3-RFI-WG-C-4806-01
KAIG3-RFI-WG-LS-1118 01 KAIG3-RFI-WG-LS-1118-01
KAIG3-RFI-SW-A-0791 00 KAIG3-RFI-SW-A-0791-00
KAIG3-RFI-MB-A-0790 00 KAIG3-RFI-MB-A-0790-00
KAIG3-RFI-MB-S-7107 00 KAIG3-RFI-MB-S-7107-00
KAIG3-RFI-ZG-S-7106 00 KAIG3-RFI-ZG-S-7106-00
KAIG3-RFI-SG-S-7099 00 KAIG3-RFI-SG-S-7099-00
KAIG3-RFI-ZG-S-7098 00 KAIG3-RFI-ZG-S-7098-00
KAIG3-RFI-PG-C-4947 00 KAIG3-RFI-PG-C-4947-00
KAIG3-RFI-PG-C-4946 00 KAIG3-RFI-PG-C-4946-00
KAIG3-RFI-TG-C-4945 00 KAIG3-RFI-TG-C-4945-00
KAIG3-RFI-ZG-C-4944 00 KAIG3-RFI-ZG-C-4944-00
KAIG3-RFI-DG-C-4943 00 KAIG3-RFI-DG-C-4943-00
KAIG3-RFI-PG-S-7082 00 KAIG3-RFI-PG-S-7082-00
KAIG3-RFI-PG-S-7081 00 KAIG3-RFI-PG-S-7081-00
KAIG3-RFI-PG-S-7080 00 KAIG3-RFI-PG-S-7080-00
KAIG3-RFI-PG-S-7079 00 KAIG3-RFI-PG-S-7079-00
KAIG3-RFI-PG-S-7078 00 KAIG3-RFI-PG-S-7078-00
KAIG3-RFI-SW-LS-1356 00 KAIG3-RFI-SW-LS-1356-00
KAIG3-RFI-SW-LS-1355 00 KAIG3-RFI-SW-LS-1355-00
KAIG3-RFI-SW-C-4956 00 KAIG3-RFI-SW-C-4956-00
KAIG3-RFI-SW-C-4955 00 KAIG3-RFI-SW-C-4955-00
KAIG3-RFI-SW-C-4954 00 KAIG3-RFI-SW-C-4954-00
KAIG3-RFI-SW-C-4953 00 KAIG3-RFI-SW-C-4953-00
KAIG3-RFI-SW-C-4952 00 KAIG3-RFI-SW-C-4952-00
KAIG3-RFI-SW-C-4951 00 KAIG3-RFI-SW-C-4951-00
KAIG3-RFI-SW-C-4950 00 KAIG3-RFI-SW-C-4950-00
KAIG3-RFI-SW-C-4949 00 KAIG3-RFI-SW-C-4949-00
KAIG3-RFI-SW-C-4948 00 KAIG3-RFI-SW-C-4948-00
KAIG3-RFI-LM-C-4936 00 KAIG3-RFI-LM-C-4936-00
KAIG3-RFI-CO-C-4928 00 KAIG3-RFI-CO-C-4928-00
KAIG3-RFI-CO-C-4927 00 KAIG3-RFI-CO-C-4927-00
KAIG3-RFI-CO-SS-0125 01 KAIG3-RFI-CO-SS-0125-01
KAIG3-RFI-CO-SS-0154 00 KAIG3-RFI-CO-SS-0154-00
KAIG3-RFI-CO-SS-0156 00 KAIG3-RFI-CO-SS-0156-00
KAIG3-RFI-MC-C-4958 00 KAIG3-RFI-MC-C-4958-00
KAIG3-RFI-CO-SS-0159 00 KAIG3-RFI-CO-SS-0159-00
KAIG3-RFI-CO-SS-0158 00 KAIG3-RFI-CO-SS-0158-00
KAIG3-RFI-CO-SS-0155 00 KAIG3-RFI-CO-SS-0155-00
KAIG3-RFI-MC-SU-2409 00 KAIG3-RFI-MC-SU-2409-00
KAIG3-RFI-CO-SU-2408 00 KAIG3-RFI-CO-SU-2408-00
KAIG3-RFI-CO-SU-2406 00 KAIG3-RFI-CO-SU-2406-00
KAIG3-RFI-LM-SU-2405 00 KAIG3-RFI-LM-SU-2405-00
KAIG3-RFI-CO-A-0792 00 KAIG3-RFI-CO-A-0792-00
KAIG3-RFI-CO-SU-2402 00 KAIG3-RFI-CO-SU-2402-00
KAIG3-RFI-PC-SU-2404 00 KAIG3-RFI-PC-SU-2404-00
KAIG3-RFI-CO-SU-2403 00 KAIG3-RFI-CO-SU-2403-00
KAIG3-RFI-MC-S-7104 00 KAIG3-RFI-MC-S-7104-00
KAIG3-RFI-MC-S-7105 00 KAIG3-RFI-MC-S-7105-00
KAIG3-RFI-MC-S-7100 00 KAIG3-RFI-MC-S-7100-00
KAIG3-RFI-CO-S-7101 00 KAIG3-RFI-CO-S-7101-00
KAIG3-RFI-CO-S-7102 00 KAIG3-RFI-CO-S-7102-00
KAIG3-RFI-CO-S-7095 00 KAIG3-RFI-CO-S-7095-00
KAIG3-RFI-CO-S-7094 00 KAIG3-RFI-CO-S-7094-00
KAIG3-RFI-LM-S-7091 00 KAIG3-RFI-LM-S-7091-00
KAIG3-RFI-LM-S-7092 00 KAIG3-RFI-LM-S-7092-00
KAIG3-RFI-CO-S-7083 00 KAIG3-RFI-CO-S-7083-00
KAIG3-RFI-CO-S-7085 00 KAIG3-RFI-CO-S-7085-00
KAIG3-RFI-CO-S-7086 00 KAIG3-RFI-CO-S-7086-00
KAIG3-RFI-PC-S-7090 00 KAIG3-RFI-PC-S-7090-00
KAIG3-RFI-PC-S-7089 00 KAIG3-RFI-PC-S-7089-00
KAIG3-RFI-CO-S-7087 00 KAIG3-RFI-CO-S-7087-00
KAIG3-RFI-CO-S-7088 00 KAIG3-RFI-CO-S-7088-00
KAIG3-RFI-PG-S-7097 00 KAIG3-RFI-PG-S-7097-00
KAIG3-RFI-MB-SU-2407 00 KAIG3-RFI-MB-SU-2407-00
KAIG3-RFI-MB-A-0789 00 KAIG3-RFI-MB-A-0789-00
KAIG3-RFI-MB-A-0788 00 KAIG3-RFI-MB-A-0788-00
KAIG3-RFI-SG-C-4942 00 KAIG3-RFI-SG-C-4942-00
KAIG3-RFI-WG-C-4939 00 KAIG3-RFI-WG-C-4939-00
KAIG3-RFI-WG-C-4931 00 KAIG3-RFI-WG-C-4931-00
KAIG3-RFI-MB-C-4930 00 KAIG3-RFI-MB-C-4930-00
KAIG3-RFI-MB-C-4929 00 KAIG3-RFI-MB-C-4929-00
KAIG3-RFI-ZG-C-4926 00 KAIG3-RFI-ZG-C-4926-00
KAIG3-RFI-WG-C-4925 00 KAIG3-RFI-WG-C-4925-00
KAIG3-RFI-WG-LS-1354 00 KAIG3-RFI-WG-LS-1354-00
KAIG3-RFI-WG-LS-1088 01 KAIG3-RFI-WG-LS-1088-01
KAIG3-RFI-PG-LS-1353 00 KAIG3-RFI-PG-LS-1353-00
KAIG3-RFI-WG-LS-1352 00 KAIG3-RFI-WG-LS-1352-00
KAIG3-RFI-SW-C-4940 00 KAIG3-RFI-SW-C-4940-00
KAIG3-RFI-SW-C-4938 00 KAIG3-RFI-SW-C-4938-00
KAIG3-RFI-SW-C-4937 00 KAIG3-RFI-SW-C-4937-00
KAIG3-RFI-SW-C-4935 00 KAIG3-RFI-SW-C-4935-00
KAIG3-RFI-SW-C-4933 00 KAIG3-RFI-SW-C-4933-00
KAIG3-RFI-SW-C-4932 00 KAIG3-RFI-SW-C-4932-00
KAIG3-RFI-PC-E-0435 01 KAIG3-RFI-PC-E-0435-01
KAIG3-RFI-PC-E-0434 01 KAIG3-RFI-PC-E-0434-01
KAIG3-RFI-PC-E-0431 01 KAIG3-RFI-PC-E-0431-01
KAIG3-RFI-MB-A-0787 00 KAIG3-RFI-MB-A-0787-00
KAIG3-RFI-TB-S-7070 00 KAIG3-RFI-TB-S-7070-00
KAIG3-RFI-TB-S-7069 00 KAIG3-RFI-TB-S-7069-00
KAIG3-RFI-TB-SU-2400 00 KAIG3-RFI-TB-SU-2400-00
KAIG3-RFI-WG-C-4924 00 KAIG3-RFI-WG-C-4924-00
KAIG3-RFI-ZG-C-4909 00 KAIG3-RFI-ZG-C-4909-00
KAIG3-RFI-SG-C-4908 00 KAIG3-RFI-SG-C-4908-00
KAIG3-RFI-WG-C-4907 00 KAIG3-RFI-WG-C-4907-00
KAIG3-RFI-SG-C-4906 00 KAIG3-RFI-SG-C-4906-00
KAIG3-RFI-PC-E-0437 00 KAIG3-RFI-PC-E-0437-00
KAIG3-RFI-PC-LC-0558 00 KAIG3-RFI-PC-LC-0558-00
KAIG3-RFI-PC-LC-0557 00 KAIG3-RFI-PC-LC-0557-00
KAIG3-RFI-PC-LC-0556 00 KAIG3-RFI-PC-LC-0556-00
KAIG3-RFI-PC-LC-0555 00 KAIG3-RFI-PC-LC-0555-00
KAIG3-RFI-SW-C-4503 01 KAIG3-RFI-SW-C-4503-01
KAIG3-RFI-CO-SU-2347 01 KAIG3-RFI-CO-SU-2347-01
KAIG3-RFI-CO-S-6868 01 KAIG3-RFI-CO-S-6868-01
KAIG3-RFI-CO-S-6409 01 KAIG3-RFI-CO-S-6409-01
KAIG3-RFI-CO-S-6867 01 KAIG3-RFI-CO-S-6867-01
KAIG3-RFI-CO-S-6889 01 KAIG3-RFI-CO-S-6889-01
KAIG3-RFI-CO-SS-0153 00 KAIG3-RFI-CO-SS-0153-00
KAIG3-RFI-CO-SU-2401 00 KAIG3-RFI-CO-SU-2401-00
KAIG3-RFI-CO-S-7076 00 KAIG3-RFI-CO-S-7076-00
KAIG3-RFI-MC-C-4921 00 KAIG3-RFI-MC-C-4921-00
KAIG3-RFI-PC-LC-0554 00 KAIG3-RFI-PC-LC-0554-00
KAIG3-RFI-PC-LC-0553 00 KAIG3-RFI-PC-LC-0553-00
KAIG3-RFI-PC-LC-0552 00 KAIG3-RFI-PC-LC-0552-00
KAIG3-RFI-SW-LS-1351 00 KAIG3-RFI-SW-LS-1351-00
KAIG3-RFI-SW-C-4923 00 KAIG3-RFI-SW-C-4923-00
KAIG3-RFI-SW-C-4922 00 KAIG3-RFI-SW-C-4922-00
KAIG3-RFI-SW-C-4920 00 KAIG3-RFI-SW-C-4920-00
KAIG3-RFI-SW-C-4919 00 KAIG3-RFI-SW-C-4919-00
KAIG3-RFI-SW-C-4918 00 KAIG3-RFI-SW-C-4918-00
KAIG3-RFI-SW-C-4916 00 KAIG3-RFI-SW-C-4916-00
KAIG3-RFI-SW-C-4915 00 KAIG3-RFI-SW-C-4915-00
KAIG3-RFI-SW-C-4914 00 KAIG3-RFI-SW-C-4914-00
KAIG3-RFI-SW-C-4913 00 KAIG3-RFI-SW-C-4913-00
KAIG3-RFI-WG-P-0215 00 KAIG3-RFI-WG-P-0215-00
KAIG3-RFI-SW-C-4912 00 KAIG3-RFI-SW-C-4912-00
KAIG3-RFI-SW-C-4911 00 KAIG3-RFI-SW-C-4911-00
KAIG3-RFI-SW-C-4910 00 KAIG3-RFI-SW-C-4910-00
KAIG3-RFI-SW-C-4900 00 KAIG3-RFI-SW-C-4900-00
KAIG3-RFI-ZG-C-4901 00 KAIG3-RFI-ZG-C-4901-00
KAIG3-RFI-ZG-C-4842 00 KAIG3-RFI-ZG-C-4842-00
KAIG3-RFI-WG-C-4903 00 KAIG3-RFI-WG-C-4903-00
KAIG3-RFI-WG-C-4902 00 KAIG3-RFI-WG-C-4902-00
KAIG3-RFI-MB-A-0785 00 KAIG3-RFI-MB-A-0785-00
KAIG3-RFI-MB-A-0784 00 KAIG3-RFI-MB-A-0784-00
KAIG3-RFI-MB-A-0783 00 KAIG3-RFI-MB-A-0783-00
KAIG3-RFI-MB-S-7068 00 KAIG3-RFI-MB-S-7068-00
KAIG3-RFI-ZG-S-7066 00 KAIG3-RFI-ZG-S-7066-00
KAIG3-RFI-AG-A-0786 00 KAIG3-RFI-AG-A-0786-00
KAIG3-RFI-SW-C-4899 00 KAIG3-RFI-SW-C-4899-00
KAIG3-RFI-SW-C-4898 00 KAIG3-RFI-SW-C-4898-00
KAIG3-RFI-SW-C-4897 00 KAIG3-RFI-SW-C-4897-00
KAIG3-RFI-SW-C-4896 00 KAIG3-RFI-SW-C-4896-00
KAIG3-RFI-SW-C-4895 00 KAIG3-RFI-SW-C-4895-00
KAIG3-RFI-SW-C-4894 00 KAIG3-RFI-SW-C-4894-00
KAIG3-RFI-SW-C-4893 00 KAIG3-RFI-SW-C-4893-00
KAIG3-RFI-SW-C-4892 00 KAIG3-RFI-SW-C-4892-00
KAIG3-RFI-SW-C-4891 00 KAIG3-RFI-SW-C-4891-00
KAIG3-RFI-SW-C-4890 00 KAIG3-RFI-SW-C-4890-00
KAIG3-RFI-SW-C-4889 00 KAIG3-RFI-SW-C-4889-00
KAIG3-RFI-SW-C-4888 00 KAIG3-RFI-SW-C-4888-00
KAIG3-RFI-SW-C-4887 00 KAIG3-RFI-SW-C-4887-00
KAIG3-RFI-SW-C-4886 00 KAIG3-RFI-SW-C-4886-00
KAIG3-RFI-CO-S-7073 00 KAIG3-RFI-CO-S-7073-00
KAIG3-RFI-CO-S-7074 00 KAIG3-RFI-CO-S-7074-00
KAIG3-RFI-CO-S-7067 00 KAIG3-RFI-CO-S-7067-00
KAIG3-RFI-CO-S-7071 00 KAIG3-RFI-CO-S-7071-00
KAIG3-RFI-CO-SS-0152 00 KAIG3-RFI-CO-SS-0152-00
KAIG3-RFI-CO-C-4904 00 KAIG3-RFI-CO-C-4904-00
KAIG3-RFI-CO-C-4905 00 KAIG3-RFI-CO-C-4905-00
KAIG3-RFI-CO-C-4883 00 KAIG3-RFI-CO-C-4883-00
KAIG3-RFI-CO-C-4882 00 KAIG3-RFI-CO-C-4882-00
KAIG3-RFI-CO-SU-2399 00 KAIG3-RFI-CO-SU-2399-00
KAIG3-RFI-CO-SU-2398 00 KAIG3-RFI-CO-SU-2398-00
KAIG3-RFI-CO-SU-2392 00 KAIG3-RFI-CO-SU-2392-00
KAIG3-RFI-CO-SS-0131 00 KAIG3-RFI-CO-SS-0131-00
KAIG3-RFI-AG-SS-0151 00 KAIG3-RFI-AG-SS-0151-00
KAIG3-RFI-PG-E-0436 00 KAIG3-RFI-PG-E-0436-00
KAIG3-RFI-PG-LC-0551 00 KAIG3-RFI-PG-LC-0551-00
KAIG3-RFI-PC-E-0434 00 KAIG3-RFI-PC-E-0434-00
KAIG3-RFI-PC-E-0435 00 KAIG3-RFI-PC-E-0435-00
KAIG3-RFI-LM-P-0209 01 KAIG3-RFI-LM-P-0209-01
KAIG3-RFI-SW-LS-1349 00 KAIG3-RFI-SW-LS-1349-00
KAIG3-RFI-MB-A-0782 00 KAIG3-RFI-MB-A-0782-00
KAIG3-RFI-MB-A-0781 00 KAIG3-RFI-MB-A-0781-00
KAIG3-RFI-PG-S-6923 01 KAIG3-RFI-PG-S-6923-01
KAIG3-RFI-TB-C-4841 00 KAIG3-RFI-TB-C-4841-00
KAIG3-RFI-MB-S-7063 00 KAIG3-RFI-MB-S-7063-00
KAIG3-RFI-MB-SU-2395 00 KAIG3-RFI-MB-SU-2395-00
KAIG3-RFI-MB-S-7056 00 KAIG3-RFI-MB-S-7056-00
KAIG3-RFI-TT-A-0780 00 KAIG3-RFI-TT-A-0780-00
KAIG3-RFI-SW-C-4885 00 KAIG3-RFI-SW-C-4885-00
KAIG3-RFI-SW-C-4884 00 KAIG3-RFI-SW-C-4884-00
KAIG3-RFI-SW-C-4880 00 KAIG3-RFI-SW-C-4880-00
KAIG3-RFI-SW-C-4879 00 KAIG3-RFI-SW-C-4879-00
KAIG3-RFI-CO-C-4881 00 KAIG3-RFI-CO-C-4881-00
KAIG3-RFI-SW-C-4878 00 KAIG3-RFI-SW-C-4878-00
KAIG3-RFI-SW-C-4877 00 KAIG3-RFI-SW-C-4877-00
KAIG3-RFI-SW-C-4876 00 KAIG3-RFI-SW-C-4876-00
KAIG3-RFI-SW-C-4875 00 KAIG3-RFI-SW-C-4875-00
KAIG3-RFI-SW-C-4874 00 KAIG3-RFI-SW-C-4874-00
KAIG3-RFI-CO-SS-0150 00 KAIG3-RFI-CO-SS-0150-00
KAIG3-RFI-SW-C-4873 00 KAIG3-RFI-SW-C-4873-00
KAIG3-RFI-SW-C-4872 00 KAIG3-RFI-SW-C-4872-00
KAIG3-RFI-CO-SU-2394 00 KAIG3-RFI-CO-SU-2394-00
KAIG3-RFI-SW-C-4871 00 KAIG3-RFI-SW-C-4871-00
KAIG3-RFI-CO-SU-2396 00 KAIG3-RFI-CO-SU-2396-00
KAIG3-RFI-SW-C-4870 00 KAIG3-RFI-SW-C-4870-00
KAIG3-RFI-SW-C-4869 00 KAIG3-RFI-SW-C-4869-00
KAIG3-RFI-SW-C-4868 00 KAIG3-RFI-SW-C-4868-00
KAIG3-RFI-CO-SU-2393 00 KAIG3-RFI-CO-SU-2393-00
KAIG3-RFI-SW-C-4865 00 KAIG3-RFI-SW-C-4865-00
KAIG3-RFI-CO-S-7020 00 KAIG3-RFI-CO-S-7020-00
KAIG3-RFI-CO-S-7023 00 KAIG3-RFI-CO-S-7023-00
KAIG3-RFI-CO-S-7062 00 KAIG3-RFI-CO-S-7062-00
KAIG3-RFI-CO-S-7064 00 KAIG3-RFI-CO-S-7064-00
KAIG3-RFI-CO-S-7043 00 KAIG3-RFI-CO-S-7043-00
KAIG3-RFI-CO-S-7061 00 KAIG3-RFI-CO-S-7061-00
KAIG3-RFI-CO-S-7058 00 KAIG3-RFI-CO-S-7058-00
KAIG3-RFI-CO-S-7059 00 KAIG3-RFI-CO-S-7059-00
KAIG3-RFI-CO-S-7060 00 KAIG3-RFI-CO-S-7060-00
KAIG3-RFI-MC-S-7057 00 KAIG3-RFI-MC-S-7057-00
KAIG3-RFI-SW-C-4864 00 KAIG3-RFI-SW-C-4864-00
KAIG3-RFI-SW-C-4862 00 KAIG3-RFI-SW-C-4862-00
KAIG3-RFI-SW-C-4861 00 KAIG3-RFI-SW-C-4861-00
KAIG3-RFI-SW-C-4860 00 KAIG3-RFI-SW-C-4860-00
KAIG3-RFI-SW-C-4859 00 KAIG3-RFI-SW-C-4859-00
KAIG3-RFI-SW-C-4858 00 KAIG3-RFI-SW-C-4858-00
KAIG3-RFI-SW-C-4857 00 KAIG3-RFI-SW-C-4857-00
KAIG3-RFI-SW-C-4856 00 KAIG3-RFI-SW-C-4856-00
KAIG3-RFI-SW-C-4855 00 KAIG3-RFI-SW-C-4855-00
KAIG3-RFI-SW-C-4854 00 KAIG3-RFI-SW-C-4854-00
KAIG3-RFI-SW-C-4853 00 KAIG3-RFI-SW-C-4853-00
KAIG3-RFI-SW-C-4850 00 KAIG3-RFI-SW-C-4850-00
KAIG3-RFI-SW-C-4849 00 KAIG3-RFI-SW-C-4849-00
KAIG3-RFI-SW-C-4848 00 KAIG3-RFI-SW-C-4848-00
KAIG3-RFI-SW-C-4847 00 KAIG3-RFI-SW-C-4847-00
KAIG3-RFI-SW-C-4846 00 KAIG3-RFI-SW-C-4846-00
KAIG3-RFI-SW-C-4845 00 KAIG3-RFI-SW-C-4845-00
KAIG3-RFI-SW-C-4844 00 KAIG3-RFI-SW-C-4844-00
KAIG3-RFI-SW-C-4843 00 KAIG3-RFI-SW-C-4843-00
KAIG3-RFI-SW-C-4867 00 KAIG3-RFI-SW-C-4867-00
KAIG3-RFI-SW-C-4866 00 KAIG3-RFI-SW-C-4866-00
KAIG3-RFI-PC-E-0431 00 KAIG3-RFI-PC-E-0431-00
KAIG3-RFI-PC-LC-0549 00 KAIG3-RFI-PC-LC-0549-00
KAIG3-RFI-PC-LC-0548 00 KAIG3-RFI-PC-LC-0548-00
KAIG3-RFI-TG-SU-2380 00 KAIG3-RFI-TG-SU-2380-00
KAIG3-RFI-PC-LC-0547 00 KAIG3-RFI-PC-LC-0547-00
KAIG3-RFI-GN-LS-1348 00 KAIG3-RFI-GN-LS-1348-00
KAIG3-RFI-MB-LC-0546 00 KAIG3-RFI-MB-LC-0546-00
KAIG3-RFI-SW-E-0433 00 KAIG3-RFI-SW-E-0433-00
KAIG3-RFI-WG-S-7055 00 KAIG3-RFI-WG-S-7055-00
KAIG3-RFI-WG-C-4808 00 KAIG3-RFI-WG-C-4808-00
KAIG3-RFI-TG-C-4807 00 KAIG3-RFI-TG-C-4807-00
KAIG3-RFI-MB-A-0779 00 KAIG3-RFI-MB-A-0779-00
KAIG3-RFI-MB-A-0778 00 KAIG3-RFI-MB-A-0778-00
KAIG3-RFI-PG-S-7054 00 KAIG3-RFI-PG-S-7054-00
KAIG3-RFI-PG-SU-2379 00 KAIG3-RFI-PG-SU-2379-00
KAIG3-RFI-WG-S-7053 00 KAIG3-RFI-WG-S-7053-00
KAIG3-RFI-WG-SU-2389 00 KAIG3-RFI-WG-SU-2389-00
KAIG3-RFI-WG-S-7052 00 KAIG3-RFI-WG-S-7052-00
KAIG3-RFI-WG-C-4840 00 KAIG3-RFI-WG-C-4840-00
KAIG3-RFI-PG-SU-2388 00 KAIG3-RFI-PG-SU-2388-00
KAIG3-RFI-PG-S-7051 00 KAIG3-RFI-PG-S-7051-00
KAIG3-RFI-TG-S-7050 00 KAIG3-RFI-TG-S-7050-00
KAIG3-RFI-TG-SS-0146 00 KAIG3-RFI-TG-SS-0146-00
KAIG3-RFI-CO-SS-0147 00 KAIG3-RFI-CO-SS-0147-00
KAIG3-RFI-CO-SS-0148 00 KAIG3-RFI-CO-SS-0148-00
KAIG3-RFI-CO-SU-2390 00 KAIG3-RFI-CO-SU-2390-00
KAIG3-RFI-CO-SU-2391 00 KAIG3-RFI-CO-SU-2391-00
KAIG3-RFI-CO-S-6979 00 KAIG3-RFI-CO-S-6979-00
KAIG3-RFI-CO-S-6947 00 KAIG3-RFI-CO-S-6947-00
KAIG3-RFI-CO-S-6955 00 KAIG3-RFI-CO-S-6955-00
KAIG3-RFI-CO-SS-0149 00 KAIG3-RFI-CO-SS-0149-00
KAIG3-RFI-CO-S-6870 00 KAIG3-RFI-CO-S-6870-00
KAIG3-RFI-CO-S-6899 00 KAIG3-RFI-CO-S-6899-00
KAIG3-RFI-MC-C-4851 00 KAIG3-RFI-MC-C-4851-00
KAIG3-RFI-CO-C-4852 00 KAIG3-RFI-CO-C-4852-00
KAIG3-RFI-SW-P-0214 00 KAIG3-RFI-SW-P-0214-00
KAIG3-RFI-SW-E-0432 00 KAIG3-RFI-SW-E-0432-00
KAIG3-RFI-WG-C-4541 00 KAIG3-RFI-WG-C-4541-00
KAIG3-RFI-SW-C-4839 00 KAIG3-RFI-SW-C-4839-00
KAIG3-RFI-SW-C-4838 00 KAIG3-RFI-SW-C-4838-00
KAIG3-RFI-SW-C-4837 00 KAIG3-RFI-SW-C-4837-00
KAIG3-RFI-SW-C-4836 00 KAIG3-RFI-SW-C-4836-00
KAIG3-RFI-SW-C-4835 00 KAIG3-RFI-SW-C-4835-00
KAIG3-RFI-SW-C-4834 00 KAIG3-RFI-SW-C-4834-00
KAIG3-RFI-SW-C-4833 00 KAIG3-RFI-SW-C-4833-00
KAIG3-RFI-SW-C-4832 00 KAIG3-RFI-SW-C-4832-00
KAIG3-RFI-SW-C-4831 00 KAIG3-RFI-SW-C-4831-00
KAIG3-RFI-SW-C-4830 00 KAIG3-RFI-SW-C-4830-00
KAIG3-RFI-SW-C-4829 00 KAIG3-RFI-SW-C-4829-00
KAIG3-RFI-SW-C-4828 00 KAIG3-RFI-SW-C-4828-00
KAIG3-RFI-SW-C-4772 00 KAIG3-RFI-SW-C-4772-00
KAIG3-RFI-LM-SU-2387 00 KAIG3-RFI-LM-SU-2387-00
KAIG3-RFI-MC-SU-2386 00 KAIG3-RFI-MC-SU-2386-00
KAIG3-RFI-CO-SU-2385 00 KAIG3-RFI-CO-SU-2385-00
KAIG3-RFI-CO-S-7012 00 KAIG3-RFI-CO-S-7012-00
KAIG3-RFI-CO-S-7013 00 KAIG3-RFI-CO-S-7013-00
KAIG3-RFI-MC-S-7045 00 KAIG3-RFI-MC-S-7045-00
KAIG3-RFI-MC-S-7046 00 KAIG3-RFI-MC-S-7046-00
KAIG3-RFI-LM-S-7047 00 KAIG3-RFI-LM-S-7047-00
KAIG3-RFI-LM-S-7048 00 KAIG3-RFI-LM-S-7048-00
KAIG3-RFI-CO-S-7009 00 KAIG3-RFI-CO-S-7009-00
KAIG3-RFI-CO-S-7010 00 KAIG3-RFI-CO-S-7010-00
KAIG3-RFI-CO-S-7011 00 KAIG3-RFI-CO-S-7011-00
KAIG3-RFI-CO-S-7042 00 KAIG3-RFI-CO-S-7042-00
KAIG3-RFI-CO-SS-0125 00 KAIG3-RFI-CO-SS-0125-00
KAIG3-RFI-SW-C-4827 00 KAIG3-RFI-SW-C-4827-00
KAIG3-RFI-SW-C-4826 00 KAIG3-RFI-SW-C-4826-00
KAIG3-RFI-SW-C-4825 00 KAIG3-RFI-SW-C-4825-00
KAIG3-RFI-SW-C-4824 00 KAIG3-RFI-SW-C-4824-00
KAIG3-RFI-SW-C-4823 00 KAIG3-RFI-SW-C-4823-00
KAIG3-RFI-SW-C-4822 00 KAIG3-RFI-SW-C-4822-00
KAIG3-RFI-SW-C-4821 00 KAIG3-RFI-SW-C-4821-00
KAIG3-RFI-SW-C-4820 00 KAIG3-RFI-SW-C-4820-00
KAIG3-RFI-SW-C-4819 00 KAIG3-RFI-SW-C-4819-00
KAIG3-RFI-SW-C-4818 00 KAIG3-RFI-SW-C-4818-00
KAIG3-RFI-SW-C-4817 00 KAIG3-RFI-SW-C-4817-00
KAIG3-RFI-MC-C-4791 00 KAIG3-RFI-MC-C-4791-00
KAIG3-RFI-SW-C-4816 00 KAIG3-RFI-SW-C-4816-00
KAIG3-RFI-MC-C-4792 00 KAIG3-RFI-MC-C-4792-00
KAIG3-RFI-CO-C-4793 00 KAIG3-RFI-CO-C-4793-00
KAIG3-RFI-CO-SS-0144 00 KAIG3-RFI-CO-SS-0144-00
KAIG3-RFI-SW-C-4815 00 KAIG3-RFI-SW-C-4815-00
KAIG3-RFI-CO-SS-0136 00 KAIG3-RFI-CO-SS-0136-00
KAIG3-RFI-SW-C-4814 00 KAIG3-RFI-SW-C-4814-00
KAIG3-RFI-CO-SU-2384 00 KAIG3-RFI-CO-SU-2384-00
KAIG3-RFI-SW-C-4813 00 KAIG3-RFI-SW-C-4813-00
KAIG3-RFI-CO-SU-2383 00 KAIG3-RFI-CO-SU-2383-00
KAIG3-RFI-SW-C-4812 00 KAIG3-RFI-SW-C-4812-00
KAIG3-RFI-CO-SU-2370 00 KAIG3-RFI-CO-SU-2370-00
KAIG3-RFI-SW-C-4811 00 KAIG3-RFI-SW-C-4811-00
KAIG3-RFI-PC-SU-2381 00 KAIG3-RFI-PC-SU-2381-00
KAIG3-RFI-SW-C-4810 00 KAIG3-RFI-SW-C-4810-00
KAIG3-RFI-CO-SU-2382 00 KAIG3-RFI-CO-SU-2382-00
KAIG3-RFI-SW-C-4809 00 KAIG3-RFI-SW-C-4809-00
KAIG3-RFI-CO-SU-2375 00 KAIG3-RFI-CO-SU-2375-00
KAIG3-RFI-CO-SU-2376 00 KAIG3-RFI-CO-SU-2376-00
KAIG3-RFI-SW-C-4790 00 KAIG3-RFI-SW-C-4790-00
KAIG3-RFI-SW-C-4755 00 KAIG3-RFI-SW-C-4755-00
KAIG3-RFI-CO-SU-2377 00 KAIG3-RFI-CO-SU-2377-00
KAIG3-RFI-SW-C-4754 00 KAIG3-RFI-SW-C-4754-00
KAIG3-RFI-SW-C-4753 00 KAIG3-RFI-SW-C-4753-00
KAIG3-RFI-SW-C-4752 00 KAIG3-RFI-SW-C-4752-00
KAIG3-RFI-SW-C-4751 00 KAIG3-RFI-SW-C-4751-00
KAIG3-RFI-SW-C-4708 00 KAIG3-RFI-SW-C-4708-00
KAIG3-RFI-SW-C-4707 00 KAIG3-RFI-SW-C-4707-00
KAIG3-RFI-CO-SU-2372 00 KAIG3-RFI-CO-SU-2372-00
KAIG3-RFI-CO-SU-2374 00 KAIG3-RFI-CO-SU-2374-00
KAIG3-RFI-PC-SU-2371 00 KAIG3-RFI-PC-SU-2371-00
KAIG3-RFI-CO-SU-2373 00 KAIG3-RFI-CO-SU-2373-00
KAIG3-RFI-CO-S-7040 00 KAIG3-RFI-CO-S-7040-00
KAIG3-RFI-CO-S-7041 00 KAIG3-RFI-CO-S-7041-00
KAIG3-RFI-MC-S-6949 00 KAIG3-RFI-MC-S-6949-00
KAIG3-RFI-PC-S-6981 00 KAIG3-RFI-PC-S-6981-00
KAIG3-RFI-CO-S-6972 00 KAIG3-RFI-CO-S-6972-00
KAIG3-RFI-CO-S-7034 00 KAIG3-RFI-CO-S-7034-00
KAIG3-RFI-CO-S-7038 00 KAIG3-RFI-CO-S-7038-00
KAIG3-RFI-CO-S-7001 00 KAIG3-RFI-CO-S-7001-00
KAIG3-RFI-CO-S-6997 00 KAIG3-RFI-CO-S-6997-00
KAIG3-RFI-CO-S-6998 00 KAIG3-RFI-CO-S-6998-00
KAIG3-RFI-PC-S-7032 00 KAIG3-RFI-PC-S-7032-00
KAIG3-RFI-PC-S-7033 00 KAIG3-RFI-PC-S-7033-00
KAIG3-RFI-PC-S-7044 00 KAIG3-RFI-PC-S-7044-00
KAIG3-RFI-PC-S-7000 00 KAIG3-RFI-PC-S-7000-00
KAIG3-RFI-CO-S-7036 00 KAIG3-RFI-CO-S-7036-00
KAIG3-RFI-CO-S-7024 00 KAIG3-RFI-CO-S-7024-00
KAIG3-RFI-CO-S-7025 00 KAIG3-RFI-CO-S-7025-00
KAIG3-RFI-WG-C-4806 00 KAIG3-RFI-WG-C-4806-00
KAIG3-RFI-WG-C-4805 00 KAIG3-RFI-WG-C-4805-00
KAIG3-RFI-CO-S-7026 00 KAIG3-RFI-CO-S-7026-00
KAIG3-RFI-WG-C-4804 00 KAIG3-RFI-WG-C-4804-00
KAIG3-RFI-CO-S-7016 00 KAIG3-RFI-CO-S-7016-00
KAIG3-RFI-PG-SU-2378 00 KAIG3-RFI-PG-SU-2378-00
KAIG3-RFI-CO-S-7017 00 KAIG3-RFI-CO-S-7017-00
KAIG3-RFI-PG-S-6974 00 KAIG3-RFI-PG-S-6974-00
KAIG3-RFI-MB-S-7031 00 KAIG3-RFI-MB-S-7031-00
KAIG3-RFI-MB-S-7030 00 KAIG3-RFI-MB-S-7030-00
KAIG3-RFI-PC-S-7007 00 KAIG3-RFI-PC-S-7007-00
KAIG3-RFI-BO-S-7006 00 KAIG3-RFI-BO-S-7006-00
KAIG3-RFI-AG-SS-0138 00 KAIG3-RFI-AG-SS-0138-00
KAIG3-RFI-BO-S-7005 00 KAIG3-RFI-BO-S-7005-00
KAIG3-RFI-BO-S-7004 00 KAIG3-RFI-BO-S-7004-00
KAIG3-RFI-PC-S-7008 00 KAIG3-RFI-PC-S-7008-00
KAIG3-RFI-CO-SS-0145 00 KAIG3-RFI-CO-SS-0145-00
KAIG3-RFI-CO-S-7014 00 KAIG3-RFI-CO-S-7014-00
KAIG3-RFI-BO-A-0776 00 KAIG3-RFI-BO-A-0776-00
KAIG3-RFI-BO-A-0775 00 KAIG3-RFI-BO-A-0775-00
KAIG3-RFI-BO-A-0774 00 KAIG3-RFI-BO-A-0774-00
KAIG3-RFI-CO-S-7015 00 KAIG3-RFI-CO-S-7015-00
KAIG3-RFI-CO-S-7019 00 KAIG3-RFI-CO-S-7019-00
KAIG3-RFI-CO-S-7002 00 KAIG3-RFI-CO-S-7002-00
KAIG3-RFI-PC-LC-0526 01 KAIG3-RFI-PC-LC-0526-01
KAIG3-RFI-PC-LC-0525 01 KAIG3-RFI-PC-LC-0525-01
KAIG3-RFI-CC-LC-0520 01 KAIG3-RFI-CC-LC-0520-01
KAIG3-RFI-CC-LC-0507 01 KAIG3-RFI-CC-LC-0507-01
KAIG3-RFI-SW-LS-1347 00 KAIG3-RFI-SW-LS-1347-00
KAIG3-RFI-SW-C-4803 00 KAIG3-RFI-SW-C-4803-00
KAIG3-RFI-SW-C-4797 00 KAIG3-RFI-SW-C-4797-00
KAIG3-RFI-SW-C-4796 00 KAIG3-RFI-SW-C-4796-00
KAIG3-RFI-SW-C-4795 00 KAIG3-RFI-SW-C-4795-00
KAIG3-RFI-SW-C-4794 00 KAIG3-RFI-SW-C-4794-00
KAIG3-RFI-SW-C-4789 00 KAIG3-RFI-SW-C-4789-00
KAIG3-RFI-SW-C-4788 00 KAIG3-RFI-SW-C-4788-00
KAIG3-RFI-SW-C-4787 00 KAIG3-RFI-SW-C-4787-00
KAIG3-RFI-SW-C-4786 00 KAIG3-RFI-SW-C-4786-00
KAIG3-RFI-SW-C-4785 00 KAIG3-RFI-SW-C-4785-00
KAIG3-RFI-SW-C-4784 00 KAIG3-RFI-SW-C-4784-00
KAIG3-RFI-SW-C-4783 00 KAIG3-RFI-SW-C-4783-00
KAIG3-RFI-SW-C-4782 00 KAIG3-RFI-SW-C-4782-00
KAIG3-RFI-SW-C-4781 00 KAIG3-RFI-SW-C-4781-00
KAIG3-RFI-SW-LS-1346 00 KAIG3-RFI-SW-LS-1346-00
KAIG3-RFI-SW-C-4780 00 KAIG3-RFI-SW-C-4780-00
KAIG3-RFI-SW-C-4775 00 KAIG3-RFI-SW-C-4775-00
KAIG3-RFI-SW-C-4695 00 KAIG3-RFI-SW-C-4695-00
KAIG3-RFI-CO-S-7022 00 KAIG3-RFI-CO-S-7022-00
KAIG3-RFI-SW-C-4694 00 KAIG3-RFI-SW-C-4694-00
KAIG3-RFI-CO-S-7018 00 KAIG3-RFI-CO-S-7018-00
KAIG3-RFI-SW-C-4693 00 KAIG3-RFI-SW-C-4693-00
KAIG3-RFI-SW-C-4692 00 KAIG3-RFI-SW-C-4692-00
KAIG3-RFI-CO-S-7021 00 KAIG3-RFI-CO-S-7021-00
KAIG3-RFI-SW-C-4691 00 KAIG3-RFI-SW-C-4691-00
KAIG3-RFI-SW-C-4690 00 KAIG3-RFI-SW-C-4690-00
KAIG3-RFI-CO-SS-0141 00 KAIG3-RFI-CO-SS-0141-00
KAIG3-RFI-CO-SS-0140 00 KAIG3-RFI-CO-SS-0140-00
KAIG3-RFI-CO-SS-0101 01 KAIG3-RFI-CO-SS-0101-01
KAIG3-RFI-CO-SS-0143 00 KAIG3-RFI-CO-SS-0143-00
KAIG3-RFI-CO-SS-0142 00 KAIG3-RFI-CO-SS-0142-00
KAIG3-RFI-PC-E-0424 01 KAIG3-RFI-PC-E-0424-01
KAIG3-RFI-PG-S-6989 00 KAIG3-RFI-PG-S-6989-00
KAIG3-RFI-CO-SS-0138 00 KAIG3-RFI-CO-SS-0138-00
KAIG3-RFI-PC-E-0423 01 KAIG3-RFI-PC-E-0423-01
KAIG3-RFI-PG-SU-2367 00 KAIG3-RFI-PG-SU-2367-00
KAIG3-RFI-CO-SS-0137 00 KAIG3-RFI-CO-SS-0137-00
KAIG3-RFI-WG-C-4779 00 KAIG3-RFI-WG-C-4779-00
KAIG3-RFI-WG-C-4778 00 KAIG3-RFI-WG-C-4778-00
KAIG3-RFI-WG-C-4777 00 KAIG3-RFI-WG-C-4777-00
KAIG3-RFI-PG-C-4748 00 KAIG3-RFI-PG-C-4748-00
KAIG3-RFI-MB-A-0773 00 KAIG3-RFI-MB-A-0773-00
KAIG3-RFI-SW-C-4774 00 KAIG3-RFI-SW-C-4774-00
KAIG3-RFI-SW-C-4773 00 KAIG3-RFI-SW-C-4773-00
KAIG3-RFI-SW-C-4771 00 KAIG3-RFI-SW-C-4771-00
KAIG3-RFI-SW-C-4770 00 KAIG3-RFI-SW-C-4770-00
KAIG3-RFI-SW-C-4769 00 KAIG3-RFI-SW-C-4769-00
KAIG3-RFI-SW-C-4768 00 KAIG3-RFI-SW-C-4768-00
KAIG3-RFI-SW-C-4767 00 KAIG3-RFI-SW-C-4767-00
KAIG3-RFI-SW-C-4766 00 KAIG3-RFI-SW-C-4766-00
KAIG3-RFI-SW-C-4765 00 KAIG3-RFI-SW-C-4765-00
KAIG3-RFI-SW-C-4764 00 KAIG3-RFI-SW-C-4764-00
KAIG3-RFI-SW-C-4554 00 KAIG3-RFI-SW-C-4554-00
KAIG3-RFI-SW-C-4553 00 KAIG3-RFI-SW-C-4553-00
KAIG3-RFI-WG-C-4776 00 KAIG3-RFI-WG-C-4776-00
KAIG3-RFI-ZG-SU-2366 00 KAIG3-RFI-ZG-SU-2366-00
KAIG3-RFI-SW-E-0430 00 KAIG3-RFI-SW-E-0430-00
KAIG3-RFI-TB-LC-0544 00 KAIG3-RFI-TB-LC-0544-00
KAIG3-RFI-PC-LC-0541 00 KAIG3-RFI-PC-LC-0541-00
KAIG3-RFI-TT-S-6990 00 KAIG3-RFI-TT-S-6990-00
KAIG3-RFI-CO-S-7003 00 KAIG3-RFI-CO-S-7003-00
KAIG3-RFI-MC-C-4761 00 KAIG3-RFI-MC-C-4761-00
KAIG3-RFI-MC-C-4762 00 KAIG3-RFI-MC-C-4762-00
KAIG3-RFI-CO-C-4763 00 KAIG3-RFI-CO-C-4763-00
KAIG3-RFI-WG-LS-1345 00 KAIG3-RFI-WG-LS-1345-00
KAIG3-RFI-PT-A-0772 00 KAIG3-RFI-PT-A-0772-00
KAIG3-RFI-PT-A-0771 00 KAIG3-RFI-PT-A-0771-00
KAIG3-RFI-ZG-C-4745 00 KAIG3-RFI-ZG-C-4745-00
KAIG3-RFI-TG-C-4747 00 KAIG3-RFI-TG-C-4747-00
KAIG3-RFI-TG-C-4746 00 KAIG3-RFI-TG-C-4746-00
KAIG3-RFI-CO-SS-0124 00 KAIG3-RFI-CO-SS-0124-00
KAIG3-RFI-TB-E-0429 00 KAIG3-RFI-TB-E-0429-00
KAIG3-RFI-WG-P-0213 00 KAIG3-RFI-WG-P-0213-00
KAIG3-RFI-TB-LC-0545 00 KAIG3-RFI-TB-LC-0545-00
KAIG3-RFI-SW-C-4760 00 KAIG3-RFI-SW-C-4760-00
KAIG3-RFI-TB-LC-0543 00 KAIG3-RFI-TB-LC-0543-00
KAIG3-RFI-TB-LC-0542 00 KAIG3-RFI-TB-LC-0542-00
KAIG3-RFI-SW-C-4759 00 KAIG3-RFI-SW-C-4759-00
KAIG3-RFI-SW-C-4758 00 KAIG3-RFI-SW-C-4758-00
KAIG3-RFI-SW-C-4757 00 KAIG3-RFI-SW-C-4757-00
KAIG3-RFI-SW-C-4756 00 KAIG3-RFI-SW-C-4756-00
KAIG3-RFI-CO-SS-0093 01 KAIG3-RFI-CO-SS-0093-01
KAIG3-RFI-MC-C-4727 00 KAIG3-RFI-MC-C-4727-00
KAIG3-RFI-CC-C-4425 01 KAIG3-RFI-CC-C-4425-01
KAIG3-RFI-CO-C-4730 00 KAIG3-RFI-CO-C-4730-00
KAIG3-RFI-MC-C-4721 00 KAIG3-RFI-MC-C-4721-00
KAIG3-RFI-CO-C-4728 00 KAIG3-RFI-CO-C-4728-00
KAIG3-RFI-MC-C-4731 00 KAIG3-RFI-MC-C-4731-00
KAIG3-RFI-SW-C-4750 00 KAIG3-RFI-SW-C-4750-00
KAIG3-RFI-CO-SU-2368 00 KAIG3-RFI-CO-SU-2368-00
KAIG3-RFI-CO-SU-2369 00 KAIG3-RFI-CO-SU-2369-00
KAIG3-RFI-SW-C-4749 00 KAIG3-RFI-SW-C-4749-00
KAIG3-RFI-CO-SU-2315 01 KAIG3-RFI-CO-SU-2315-01
KAIG3-RFI-SW-C-4743 00 KAIG3-RFI-SW-C-4743-00
KAIG3-RFI-SW-C-4742 00 KAIG3-RFI-SW-C-4742-00
KAIG3-RFI-SW-C-4741 00 KAIG3-RFI-SW-C-4741-00
KAIG3-RFI-CO-SU-2291 01 KAIG3-RFI-CO-SU-2291-01
KAIG3-RFI-SW-C-4740 00 KAIG3-RFI-SW-C-4740-00
KAIG3-RFI-CF-SU-2364 00 KAIG3-RFI-CF-SU-2364-00
KAIG3-RFI-SW-C-4739 00 KAIG3-RFI-SW-C-4739-00
KAIG3-RFI-SW-C-4738 00 KAIG3-RFI-SW-C-4738-00
KAIG3-RFI-SW-C-4737 00 KAIG3-RFI-SW-C-4737-00
KAIG3-RFI-SW-C-4736 00 KAIG3-RFI-SW-C-4736-00
KAIG3-RFI-SW-C-4735 00 KAIG3-RFI-SW-C-4735-00
KAIG3-RFI-SW-C-4734 00 KAIG3-RFI-SW-C-4734-00
KAIG3-RFI-PC-SU-2363 00 KAIG3-RFI-PC-SU-2363-00
KAIG3-RFI-SW-C-4733 00 KAIG3-RFI-SW-C-4733-00
KAIG3-RFI-SW-C-4732 00 KAIG3-RFI-SW-C-4732-00
KAIG3-RFI-CC-S-6834 01 KAIG3-RFI-CC-S-6834-01
KAIG3-RFI-CO-S-6805 01 KAIG3-RFI-CO-S-6805-01
KAIG3-RFI-MC-S-6612 01 KAIG3-RFI-MC-S-6612-01
KAIG3-RFI-CO-S-6994 00 KAIG3-RFI-CO-S-6994-00
KAIG3-RFI-CO-S-6995 00 KAIG3-RFI-CO-S-6995-00
KAIG3-RFI-CO-S-6996 00 KAIG3-RFI-CO-S-6996-00
KAIG3-RFI-CF-S-6982 00 KAIG3-RFI-CF-S-6982-00
KAIG3-RFI-CF-S-6983 00 KAIG3-RFI-CF-S-6983-00
KAIG3-RFI-CF-S-6984 00 KAIG3-RFI-CF-S-6984-00
KAIG3-RFI-MC-S-6991 00 KAIG3-RFI-MC-S-6991-00
KAIG3-RFI-SG-S-6988 00 KAIG3-RFI-SG-S-6988-00
KAIG3-RFI-WG-LS-1339 00 KAIG3-RFI-WG-LS-1339-00
KAIG3-RFI-CO-S-6992 00 KAIG3-RFI-CO-S-6992-00
KAIG3-RFI-WG-C-4515 00 KAIG3-RFI-WG-C-4515-00
KAIG3-RFI-PC-S-6979 00 KAIG3-RFI-PC-S-6979-00
KAIG3-RFI-PC-S-6980 00 KAIG3-RFI-PC-S-6980-00
KAIG3-RFI-TB-SU-2365 00 KAIG3-RFI-TB-SU-2365-00
KAIG3-RFI-CO-S-6985 00 KAIG3-RFI-CO-S-6985-00
KAIG3-RFI-SG-SU-2354 00 KAIG3-RFI-SG-SU-2354-00
KAIG3-RFI-SG-SU-2353 00 KAIG3-RFI-SG-SU-2353-00
KAIG3-RFI-WG-SU-2352 00 KAIG3-RFI-WG-SU-2352-00
KAIG3-RFI-TB-S-6987 00 KAIG3-RFI-TB-S-6987-00
KAIG3-RFI-WG-S-6986 00 KAIG3-RFI-WG-S-6986-00
KAIG3-RFI-SG-S-6975 00 KAIG3-RFI-SG-S-6975-00
KAIG3-RFI-WG-C-4744 00 KAIG3-RFI-WG-C-4744-00
KAIG3-RFI-TB-S-6874 00 KAIG3-RFI-TB-S-6874-00
KAIG3-RFI-DG-C-4720 00 KAIG3-RFI-DG-C-4720-00
KAIG3-RFI-DG-C-4719 00 KAIG3-RFI-DG-C-4719-00
KAIG3-RFI-CO-SU-2360 00 KAIG3-RFI-CO-SU-2360-00
KAIG3-RFI-CO-C-4685 00 KAIG3-RFI-CO-C-4685-00
KAIG3-RFI-CO-C-4686 00 KAIG3-RFI-CO-C-4686-00
KAIG3-RFI-MB-A-0770 00 KAIG3-RFI-MB-A-0770-00
KAIG3-RFI-SW-LS-1344 00 KAIG3-RFI-SW-LS-1344-00
KAIG3-RFI-MB-A-0769 00 KAIG3-RFI-MB-A-0769-00
KAIG3-RFI-SW-LS-1343 00 KAIG3-RFI-SW-LS-1343-00
KAIG3-RFI-SW-LS-1342 00 KAIG3-RFI-SW-LS-1342-00
KAIG3-RFI-SW-C-4726 00 KAIG3-RFI-SW-C-4726-00
KAIG3-RFI-SW-C-4725 00 KAIG3-RFI-SW-C-4725-00
KAIG3-RFI-SW-C-4724 00 KAIG3-RFI-SW-C-4724-00
KAIG3-RFI-SW-C-4723 00 KAIG3-RFI-SW-C-4723-00
KAIG3-RFI-SW-C-4722 00 KAIG3-RFI-SW-C-4722-00
KAIG3-RFI-SW-C-4713 00 KAIG3-RFI-SW-C-4713-00
KAIG3-RFI-SW-C-4712 00 KAIG3-RFI-SW-C-4712-00
KAIG3-RFI-SW-C-4711 00 KAIG3-RFI-SW-C-4711-00
KAIG3-RFI-SW-C-4710 00 KAIG3-RFI-SW-C-4710-00
KAIG3-RFI-SW-C-4709 00 KAIG3-RFI-SW-C-4709-00
KAIG3-RFI-SW-C-4706 00 KAIG3-RFI-SW-C-4706-00
KAIG3-RFI-SW-C-4705 00 KAIG3-RFI-SW-C-4705-00
KAIG3-RFI-SW-C-4704 00 KAIG3-RFI-SW-C-4704-00
KAIG3-RFI-SW-C-4700 00 KAIG3-RFI-SW-C-4700-00
KAIG3-RFI-SW-C-4699 00 KAIG3-RFI-SW-C-4699-00
KAIG3-RFI-SW-C-4698 00 KAIG3-RFI-SW-C-4698-00
KAIG3-RFI-SW-C-4697 00 KAIG3-RFI-SW-C-4697-00
KAIG3-RFI-SW-C-4273 01 KAIG3-RFI-SW-C-4273-01
KAIG3-RFI-PC-E-0428 00 KAIG3-RFI-PC-E-0428-00
KAIG3-RFI-CO-E-0427 00 KAIG3-RFI-CO-E-0427-00
KAIG3-RFI-PC-E-0426 00 KAIG3-RFI-PC-E-0426-00
KAIG3-RFI-PC-LC-0540 00 KAIG3-RFI-PC-LC-0540-00
KAIG3-RFI-PC-LC-0539 00 KAIG3-RFI-PC-LC-0539-00
KAIG3-RFI-WG-C-4718 00 KAIG3-RFI-WG-C-4718-00
KAIG3-RFI-WG-C-4717 00 KAIG3-RFI-WG-C-4717-00
KAIG3-RFI-ZG-S-6873 00 KAIG3-RFI-ZG-S-6873-00
KAIG3-RFI-TB-SU-2350 00 KAIG3-RFI-TB-SU-2350-00
KAIG3-RFI-CO-SU-2359 00 KAIG3-RFI-CO-SU-2359-00
KAIG3-RFI-ZG-SU-2348 00 KAIG3-RFI-ZG-SU-2348-00
KAIG3-RFI-CO-S-6958 00 KAIG3-RFI-CO-S-6958-00
KAIG3-RFI-CO-S-6959 00 KAIG3-RFI-CO-S-6959-00
KAIG3-RFI-CO-S-6960 00 KAIG3-RFI-CO-S-6960-00
KAIG3-RFI-CO-S-6961 00 KAIG3-RFI-CO-S-6961-00
KAIG3-RFI-CO-S-6962 00 KAIG3-RFI-CO-S-6962-00
KAIG3-RFI-CO-S-6963 00 KAIG3-RFI-CO-S-6963-00
KAIG3-RFI-CO-C-4716 00 KAIG3-RFI-CO-C-4716-00
KAIG3-RFI-MC-C-4714 00 KAIG3-RFI-MC-C-4714-00
KAIG3-RFI-MC-C-4715 00 KAIG3-RFI-MC-C-4715-00
KAIG3-RFI-CO-SU-2362 00 KAIG3-RFI-CO-SU-2362-00
KAIG3-RFI-CO-SS-0133 00 KAIG3-RFI-CO-SS-0133-00
KAIG3-RFI-CO-SU-2361 00 KAIG3-RFI-CO-SU-2361-00
KAIG3-RFI-CO-SS-0135 00 KAIG3-RFI-CO-SS-0135-00
KAIG3-RFI-CO-S-6973 00 KAIG3-RFI-CO-S-6973-00
KAIG3-RFI-WG-S-6954 00 KAIG3-RFI-WG-S-6954-00
KAIG3-RFI-CO-S-6977 00 KAIG3-RFI-CO-S-6977-00
KAIG3-RFI-CO-S-6978 00 KAIG3-RFI-CO-S-6978-00
KAIG3-RFI-WG-C-4703 00 KAIG3-RFI-WG-C-4703-00
KAIG3-RFI-MC-S-6964 00 KAIG3-RFI-MC-S-6964-00
KAIG3-RFI-WG-C-4702 00 KAIG3-RFI-WG-C-4702-00
KAIG3-RFI-TB-C-4701 00 KAIG3-RFI-TB-C-4701-00
KAIG3-RFI-SG-C-4684 00 KAIG3-RFI-SG-C-4684-00
KAIG3-RFI-SG-C-4683 00 KAIG3-RFI-SG-C-4683-00
KAIG3-RFI-MC-S-6965 00 KAIG3-RFI-MC-S-6965-00
KAIG3-RFI-MB-S-6956 00 KAIG3-RFI-MB-S-6956-00
KAIG3-RFI-MC-S-6966 00 KAIG3-RFI-MC-S-6966-00
KAIG3-RFI-MC-S-6967 00 KAIG3-RFI-MC-S-6967-00
KAIG3-RFI-CC-S-6968 00 KAIG3-RFI-CC-S-6968-00
KAIG3-RFI-CC-S-6969 00 KAIG3-RFI-CC-S-6969-00
KAIG3-RFI-CO-S-6832 00 KAIG3-RFI-CO-S-6832-00
KAIG3-RFI-CO-S-6971 00 KAIG3-RFI-CO-S-6971-00
KAIG3-RFI-CO-S-6859 00 KAIG3-RFI-CO-S-6859-00
KAIG3-RFI-CO-S-6970 00 KAIG3-RFI-CO-S-6970-00
KAIG3-RFI-CO-S-6895 00 KAIG3-RFI-CO-S-6895-00
KAIG3-RFI-CO-S-6891 00 KAIG3-RFI-CO-S-6891-00
KAIG3-RFI-CO-S-6905 00 KAIG3-RFI-CO-S-6905-00
KAIG3-RFI-CO-S-6758 00 KAIG3-RFI-CO-S-6758-00
KAIG3-RFI-LM-S-6865 00 KAIG3-RFI-LM-S-6865-00
KAIG3-RFI-CO-S-6903 00 KAIG3-RFI-CO-S-6903-00
KAIG3-RFI-SG-C-4668 00 KAIG3-RFI-SG-C-4668-00
KAIG3-RFI-SW-C-4696 00 KAIG3-RFI-SW-C-4696-00
KAIG3-RFI-SW-C-4689 00 KAIG3-RFI-SW-C-4689-00
KAIG3-RFI-PA-C-4665 00 KAIG3-RFI-PA-C-4665-00
KAIG3-RFI-SW-C-4688 00 KAIG3-RFI-SW-C-4688-00
KAIG3-RFI-SW-C-4687 00 KAIG3-RFI-SW-C-4687-00
KAIG3-RFI-SW-C-4664 00 KAIG3-RFI-SW-C-4664-00
KAIG3-RFI-SW-C-4663 00 KAIG3-RFI-SW-C-4663-00
KAIG3-RFI-SW-C-4652 00 KAIG3-RFI-SW-C-4652-00
KAIG3-RFI-SW-C-4651 00 KAIG3-RFI-SW-C-4651-00
KAIG3-RFI-CO-S-6798 00 KAIG3-RFI-CO-S-6798-00
KAIG3-RFI-CO-S-6950 00 KAIG3-RFI-CO-S-6950-00
KAIG3-RFI-MC-S-6951 00 KAIG3-RFI-MC-S-6951-00
KAIG3-RFI-MC-S-6952 00 KAIG3-RFI-MC-S-6952-00
KAIG3-RFI-MC-S-6953 00 KAIG3-RFI-MC-S-6953-00
KAIG3-RFI-MC-SU-2358 00 KAIG3-RFI-MC-SU-2358-00
KAIG3-RFI-CO-C-4670 00 KAIG3-RFI-CO-C-4670-00
KAIG3-RFI-MC-C-4650 00 KAIG3-RFI-MC-C-4650-00
KAIG3-RFI-CO-C-4671 00 KAIG3-RFI-CO-C-4671-00
KAIG3-RFI-CO-C-4672 00 KAIG3-RFI-CO-C-4672-00
KAIG3-RFI-MC-C-4673 00 KAIG3-RFI-MC-C-4673-00
KAIG3-RFI-SW-C-4357 01 KAIG3-RFI-SW-C-4357-01
KAIG3-RFI-SG-C-4641 00 KAIG3-RFI-SG-C-4641-00
KAIG3-RFI-PC-LC-0538 00 KAIG3-RFI-PC-LC-0538-00
KAIG3-RFI-PC-LC-0537 00 KAIG3-RFI-PC-LC-0537-00
KAIG3-RFI-PG-LC-0536 00 KAIG3-RFI-PG-LC-0536-00
KAIG3-RFI-PC-E-0425 00 KAIG3-RFI-PC-E-0425-00
KAIG3-RFI-CO-SS-0123 00 KAIG3-RFI-CO-SS-0123-00
KAIG3-RFI-WG-P-0212 00 KAIG3-RFI-WG-P-0212-00
KAIG3-RFI-CO-SS-0132 00 KAIG3-RFI-CO-SS-0132-00
KAIG3-RFI-WG-P-0211 00 KAIG3-RFI-WG-P-0211-00
KAIG3-RFI-CO-C-4656 00 KAIG3-RFI-CO-C-4656-00
KAIG3-RFI-CO-C-4648 00 KAIG3-RFI-CO-C-4648-00
KAIG3-RFI-CO-C-4649 00 KAIG3-RFI-CO-C-4649-00
KAIG3-RFI-CO-C-4623 00 KAIG3-RFI-CO-C-4623-00
KAIG3-RFI-CO-C-4657 00 KAIG3-RFI-CO-C-4657-00
KAIG3-RFI-CO-C-4658 00 KAIG3-RFI-CO-C-4658-00
KAIG3-RFI-MC-SU-2357 00 KAIG3-RFI-MC-SU-2357-00
KAIG3-RFI-MC-SU-2355 00 KAIG3-RFI-MC-SU-2355-00
KAIG3-RFI-CO-SU-2356 00 KAIG3-RFI-CO-SU-2356-00
KAIG3-RFI-SG-C-4649 00 KAIG3-RFI-SG-C-4649-00
KAIG3-RFI-ZG-C-4627 00 KAIG3-RFI-ZG-C-4627-00
KAIG3-RFI-ZG-C-4682 00 KAIG3-RFI-ZG-C-4682-00
KAIG3-RFI-SW-LS-1341 00 KAIG3-RFI-SW-LS-1341-00
KAIG3-RFI-SW-C-4681 00 KAIG3-RFI-SW-C-4681-00
KAIG3-RFI-SW-C-4680 00 KAIG3-RFI-SW-C-4680-00
KAIG3-RFI-SW-C-4679 00 KAIG3-RFI-SW-C-4679-00
KAIG3-RFI-SW-C-4678 00 KAIG3-RFI-SW-C-4678-00
KAIG3-RFI-SW-C-4677 00 KAIG3-RFI-SW-C-4677-00
KAIG3-RFI-SW-C-4676 00 KAIG3-RFI-SW-C-4676-00
KAIG3-RFI-MC-S-6948 00 KAIG3-RFI-MC-S-6948-00
KAIG3-RFI-SW-C-4675 00 KAIG3-RFI-SW-C-4675-00
KAIG3-RFI-CO-S-6945 00 KAIG3-RFI-CO-S-6945-00
KAIG3-RFI-SW-C-4674 00 KAIG3-RFI-SW-C-4674-00
KAIG3-RFI-MC-S-6943 00 KAIG3-RFI-MC-S-6943-00
KAIG3-RFI-SW-C-4662 00 KAIG3-RFI-SW-C-4662-00
KAIG3-RFI-MC-S-6944 00 KAIG3-RFI-MC-S-6944-00
KAIG3-RFI-SW-C-4661 00 KAIG3-RFI-SW-C-4661-00
KAIG3-RFI-SW-C-4660 00 KAIG3-RFI-SW-C-4660-00
KAIG3-RFI-SW-C-4659 00 KAIG3-RFI-SW-C-4659-00
KAIG3-RFI-CO-S-6946 00 KAIG3-RFI-CO-S-6946-00
KAIG3-RFI-WG-C-4667 00 KAIG3-RFI-WG-C-4667-00
KAIG3-RFI-WG-C-4666 00 KAIG3-RFI-WG-C-4666-00
KAIG3-RFI-WG-C-4644 00 KAIG3-RFI-WG-C-4644-00
KAIG3-RFI-WG-C-4595 00 KAIG3-RFI-WG-C-4595-00
KAIG3-RFI-SG-C-4628 00 KAIG3-RFI-SG-C-4628-00
KAIG3-RFI-PG-S-6942 00 KAIG3-RFI-PG-S-6942-00
KAIG3-RFI-CO-C-4389 00 KAIG3-RFI-CO-C-4389-00
KAIG3-RFI-PG-S-6941 00 KAIG3-RFI-PG-S-6941-00
KAIG3-RFI-CO-C-4368 00 KAIG3-RFI-CO-C-4368-00
KAIG3-RFI-CO-C-4338 00 KAIG3-RFI-CO-C-4338-00
KAIG3-RFI-CO-SS-0121 00 KAIG3-RFI-CO-SS-0121-00
KAIG3-RFI-SW-C-4655 00 KAIG3-RFI-SW-C-4655-00
KAIG3-RFI-SW-C-4654 00 KAIG3-RFI-SW-C-4654-00
KAIG3-RFI-SW-C-4653 00 KAIG3-RFI-SW-C-4653-00
KAIG3-RFI-SW-C-4647 00 KAIG3-RFI-SW-C-4647-00
KAIG3-RFI-SW-C-4640 00 KAIG3-RFI-SW-C-4640-00
KAIG3-RFI-CO-SS-0130 00 KAIG3-RFI-CO-SS-0130-00
KAIG3-RFI-SW-C-4639 00 KAIG3-RFI-SW-C-4639-00
KAIG3-RFI-SW-C-4638 00 KAIG3-RFI-SW-C-4638-00
KAIG3-RFI-SW-C-4637 00 KAIG3-RFI-SW-C-4637-00
KAIG3-RFI-SW-C-4575 00 KAIG3-RFI-SW-C-4575-00
KAIG3-RFI-SW-C-4358 01 KAIG3-RFI-SW-C-4358-01
KAIG3-RFI-SW-C-4646 00 KAIG3-RFI-SW-C-4646-00
KAIG3-RFI-SW-C-4645 00 KAIG3-RFI-SW-C-4645-00
KAIG3-RFI-PC-E-0424 00 KAIG3-RFI-PC-E-0424-00
KAIG3-RFI-PC-E-0423 00 KAIG3-RFI-PC-E-0423-00
KAIG3-RFI-PC-LC-0535 00 KAIG3-RFI-PC-LC-0535-00
KAIG3-RFI-PC-LC-0534 00 KAIG3-RFI-PC-LC-0534-00
KAIG3-RFI-WG-C-4230 01 KAIG3-RFI-WG-C-4230-01
KAIG3-RFI-TG-S-6940 00 KAIG3-RFI-TG-S-6940-00
KAIG3-RFI-PG-S-6932 00 KAIG3-RFI-PG-S-6932-00
KAIG3-RFI-BO-S-6931 00 KAIG3-RFI-BO-S-6931-00
KAIG3-RFI-WG-C-4643 00 KAIG3-RFI-WG-C-4643-00
KAIG3-RFI-PG-C-4642 00 KAIG3-RFI-PG-C-4642-00
KAIG3-RFI-AG-SS-0118 00 KAIG3-RFI-AG-SS-0118-00
KAIG3-RFI-AG-SS-0096 01 KAIG3-RFI-AG-SS-0096-01
KAIG3-RFI-SW-LS-1340 00 KAIG3-RFI-SW-LS-1340-00
KAIG3-RFI-CO-SU-2351 00 KAIG3-RFI-CO-SU-2351-00
KAIG3-RFI-CO-SU-2347 00 KAIG3-RFI-CO-SU-2347-00
KAIG3-RFI-MC-C-4601 00 KAIG3-RFI-MC-C-4601-00
KAIG3-RFI-CO-C-4602 00 KAIG3-RFI-CO-C-4602-00
KAIG3-RFI-CO-C-4603 00 KAIG3-RFI-CO-C-4603-00
KAIG3-RFI-CO-C-4604 00 KAIG3-RFI-CO-C-4604-00
KAIG3-RFI-CO-C-4624 00 KAIG3-RFI-CO-C-4624-00
KAIG3-RFI-SW-C-4636 00 KAIG3-RFI-SW-C-4636-00
KAIG3-RFI-SW-C-4635 00 KAIG3-RFI-SW-C-4635-00
KAIG3-RFI-SW-C-4634 00 KAIG3-RFI-SW-C-4634-00
KAIG3-RFI-SW-C-4633 00 KAIG3-RFI-SW-C-4633-00
KAIG3-RFI-PG-C-4580 00 KAIG3-RFI-PG-C-4580-00
KAIG3-RFI-SW-C-4632 00 KAIG3-RFI-SW-C-4632-00
KAIG3-RFI-CO-C-4625 00 KAIG3-RFI-CO-C-4625-00
KAIG3-RFI-CO-S-6939 00 KAIG3-RFI-CO-S-6939-00
KAIG3-RFI-LM-S-6919 00 KAIG3-RFI-LM-S-6919-00
KAIG3-RFI-SW-C-4631 00 KAIG3-RFI-SW-C-4631-00
KAIG3-RFI-LM-S-6925 00 KAIG3-RFI-LM-S-6925-00
KAIG3-RFI-SW-C-4630 00 KAIG3-RFI-SW-C-4630-00
KAIG3-RFI-MC-S-6926 00 KAIG3-RFI-MC-S-6926-00
KAIG3-RFI-SW-C-4629 00 KAIG3-RFI-SW-C-4629-00
KAIG3-RFI-CO-S-6927 00 KAIG3-RFI-CO-S-6927-00
KAIG3-RFI-CO-S-6928 00 KAIG3-RFI-CO-S-6928-00
KAIG3-RFI-CO-S-6929 00 KAIG3-RFI-CO-S-6929-00
KAIG3-RFI-SW-C-4621 00 KAIG3-RFI-SW-C-4621-00
KAIG3-RFI-SW-C-4620 00 KAIG3-RFI-SW-C-4620-00
KAIG3-RFI-SW-C-4619 00 KAIG3-RFI-SW-C-4619-00
KAIG3-RFI-SW-C-4618 00 KAIG3-RFI-SW-C-4618-00
KAIG3-RFI-SW-C-4617 00 KAIG3-RFI-SW-C-4617-00
KAIG3-RFI-SW-C-4616 00 KAIG3-RFI-SW-C-4616-00
KAIG3-RFI-SW-C-4615 00 KAIG3-RFI-SW-C-4615-00
KAIG3-RFI-SW-C-4614 00 KAIG3-RFI-SW-C-4614-00
KAIG3-RFI-SW-C-4613 00 KAIG3-RFI-SW-C-4613-00
KAIG3-RFI-SW-C-4612 00 KAIG3-RFI-SW-C-4612-00
KAIG3-RFI-SW-C-4611 00 KAIG3-RFI-SW-C-4611-00
KAIG3-RFI-SW-C-4610 00 KAIG3-RFI-SW-C-4610-00
KAIG3-RFI-SW-C-4609 00 KAIG3-RFI-SW-C-4609-00
KAIG3-RFI-SW-C-4608 00 KAIG3-RFI-SW-C-4608-00
KAIG3-RFI-SW-C-4607 00 KAIG3-RFI-SW-C-4607-00
KAIG3-RFI-SW-C-4606 00 KAIG3-RFI-SW-C-4606-00
KAIG3-RFI-SW-C-4605 00 KAIG3-RFI-SW-C-4605-00
KAIG3-RFI-SW-C-4600 00 KAIG3-RFI-SW-C-4600-00
KAIG3-RFI-SW-C-4599 00 KAIG3-RFI-SW-C-4599-00
KAIG3-RFI-LM-S-6930 00 KAIG3-RFI-LM-S-6930-00
KAIG3-RFI-MC-S-6934 00 KAIG3-RFI-MC-S-6934-00
KAIG3-RFI-CO-S-6935 00 KAIG3-RFI-CO-S-6935-00
KAIG3-RFI-MC-S-6936 00 KAIG3-RFI-MC-S-6936-00
KAIG3-RFI-CO-S-6937 00 KAIG3-RFI-CO-S-6937-00
KAIG3-RFI-CO-S-6938 00 KAIG3-RFI-CO-S-6938-00
KAIG3-RFI-ZG-S-6924 00 KAIG3-RFI-ZG-S-6924-00
KAIG3-RFI-WG-LS-1338 00 KAIG3-RFI-WG-LS-1338-00
KAIG3-RFI-WG-C-4626 00 KAIG3-RFI-WG-C-4626-00
KAIG3-RFI-TB-S-6909 00 KAIG3-RFI-TB-S-6909-00
KAIG3-RFI-TB-SU-2349 00 KAIG3-RFI-TB-SU-2349-00
KAIG3-RFI-SG-SU-2340 00 KAIG3-RFI-SG-SU-2340-00
KAIG3-RFI-SG-S-6908 00 KAIG3-RFI-SG-S-6908-00
KAIG3-RFI-SG-S-6898 00 KAIG3-RFI-SG-S-6898-00
KAIG3-RFI-PT-A-0768 00 KAIG3-RFI-PT-A-0768-00
KAIG3-RFI-PT-A-0767 00 KAIG3-RFI-PT-A-0767-00
KAIG3-RFI-PT-A-0766 00 KAIG3-RFI-PT-A-0766-00
KAIG3-RFI-PG-S-6923 00 KAIG3-RFI-PG-S-6923-00
KAIG3-RFI-MC-S-6759 00 KAIG3-RFI-MC-S-6759-00
KAIG3-RFI-CO-S-6726 00 KAIG3-RFI-CO-S-6726-00
KAIG3-RFI-CO-E-0422 00 KAIG3-RFI-CO-E-0422-00
KAIG3-RFI-WG-LS-1337 00 KAIG3-RFI-WG-LS-1337-00
KAIG3-RFI-WG-LS-1336 00 KAIG3-RFI-WG-LS-1336-00
KAIG3-RFI-SG-LS-1335 00 KAIG3-RFI-SG-LS-1335-00
KAIG3-RFI-PG-C-4579 00 KAIG3-RFI-PG-C-4579-00
KAIG3-RFI-PG-C-4578 00 KAIG3-RFI-PG-C-4578-00
KAIG3-RFI-PC-LC-0533 00 KAIG3-RFI-PC-LC-0533-00
KAIG3-RFI-SW-C-4594 00 KAIG3-RFI-SW-C-4594-00
KAIG3-RFI-SW-C-4593 00 KAIG3-RFI-SW-C-4593-00
KAIG3-RFI-SW-C-4592 00 KAIG3-RFI-SW-C-4592-00
KAIG3-RFI-SW-C-4590 00 KAIG3-RFI-SW-C-4590-00
KAIG3-RFI-SW-C-4589 00 KAIG3-RFI-SW-C-4589-00
KAIG3-RFI-SW-C-4588 00 KAIG3-RFI-SW-C-4588-00
KAIG3-RFI-PA-C-4587 00 KAIG3-RFI-PA-C-4587-00
KAIG3-RFI-SW-C-4586 00 KAIG3-RFI-SW-C-4586-00
KAIG3-RFI-CO-SU-2345 00 KAIG3-RFI-CO-SU-2345-00
KAIG3-RFI-CO-SU-2346 00 KAIG3-RFI-CO-SU-2346-00
KAIG3-RFI-CF-SU-2344 00 KAIG3-RFI-CF-SU-2344-00
KAIG3-RFI-CO-C-4598 00 KAIG3-RFI-CO-C-4598-00
KAIG3-RFI-MC-C-4597 00 KAIG3-RFI-MC-C-4597-00
KAIG3-RFI-CO-C-4591 00 KAIG3-RFI-CO-C-4591-00
KAIG3-RFI-CO-S-6877 00 KAIG3-RFI-CO-S-6877-00
KAIG3-RFI-CO-S-6914 00 KAIG3-RFI-CO-S-6914-00
KAIG3-RFI-CO-S-6915 00 KAIG3-RFI-CO-S-6915-00
KAIG3-RFI-CO-S-6922 00 KAIG3-RFI-CO-S-6922-00
KAIG3-RFI-MC-S-6921 00 KAIG3-RFI-MC-S-6921-00
KAIG3-RFI-CO-S-6917 00 KAIG3-RFI-CO-S-6917-00
KAIG3-RFI-PC-S-6920 00 KAIG3-RFI-PC-S-6920-00
KAIG3-RFI-CF-S-6912 00 KAIG3-RFI-CF-S-6912-00
KAIG3-RFI-CF-S-6913 00 KAIG3-RFI-CF-S-6913-00
KAIG3-RFI-CF-S-6911 00 KAIG3-RFI-CF-S-6911-00
KAIG3-RFI-CO-SS-0128 00 KAIG3-RFI-CO-SS-0128-00
KAIG3-RFI-CO-SU-2342 00 KAIG3-RFI-CO-SU-2342-00
KAIG3-RFI-LM-SU-2343 00 KAIG3-RFI-LM-SU-2343-00
KAIG3-RFI-CO-SU-2341 00 KAIG3-RFI-CO-SU-2341-00
KAIG3-RFI-CO-SU-2337 00 KAIG3-RFI-CO-SU-2337-00
KAIG3-RFI-CO-SU-2338 00 KAIG3-RFI-CO-SU-2338-00
KAIG3-RFI-CO-SU-2336 00 KAIG3-RFI-CO-SU-2336-00
KAIG3-RFI-CO-S-6910 00 KAIG3-RFI-CO-S-6910-00
KAIG3-RFI-CO-S-6904 00 KAIG3-RFI-CO-S-6904-00
KAIG3-RFI-LM-S-6907 00 KAIG3-RFI-LM-S-6907-00
KAIG3-RFI-CO-S-6902-00 00 KAIG3-RFI-CO-S-6902-00-00
KAIG3-RFI-CO-S-6890 00 KAIG3-RFI-CO-S-6890-00
KAIG3-RFI-LM-S-6906 00 KAIG3-RFI-LM-S-6906-00
KAIG3-RFI-CO-S-6893 00 KAIG3-RFI-CO-S-6893-00
KAIG3-RFI-MC-S-6892 00 KAIG3-RFI-MC-S-6892-00
KAIG3-RFI-CO-S-6894 00 KAIG3-RFI-CO-S-6894-00
KAIG3-RFI-CO-S-6886 00 KAIG3-RFI-CO-S-6886-00
KAIG3-RFI-CO-S-6887 00 KAIG3-RFI-CO-S-6887-00
KAIG3-RFI-CO-S-6888 00 KAIG3-RFI-CO-S-6888-00
KAIG3-RFI-CO-S-6889 00 KAIG3-RFI-CO-S-6889-00
KAIG3-RFI-SW-C-4584 00 KAIG3-RFI-SW-C-4584-00
KAIG3-RFI-CO-C-4585 00 KAIG3-RFI-CO-C-4585-00
KAIG3-RFI-SW-C-4583 00 KAIG3-RFI-SW-C-4583-00
KAIG3-RFI-CO-C-4550 00 KAIG3-RFI-CO-C-4550-00
KAIG3-RFI-CO-C-4551 00 KAIG3-RFI-CO-C-4551-00
KAIG3-RFI-MC-C-4562 00 KAIG3-RFI-MC-C-4562-00
KAIG3-RFI-CO-C-4548 00 KAIG3-RFI-CO-C-4548-00
KAIG3-RFI-CO-C-4549 00 KAIG3-RFI-CO-C-4549-00
KAIG3-RFI-SW-E-0421 00 KAIG3-RFI-SW-E-0421-00
KAIG3-RFI-SW-LC-0532 00 KAIG3-RFI-SW-LC-0532-00
KAIG3-RFI-SW-LC-0531 00 KAIG3-RFI-SW-LC-0531-00
KAIG3-RFI-PC-LC-0530 00 KAIG3-RFI-PC-LC-0530-00
KAIG3-RFI-PC-LC-0529 00 KAIG3-RFI-PC-LC-0529-00
KAIG3-RFI-PC-LC-0528 00 KAIG3-RFI-PC-LC-0528-00
KAIG3-RFI-SW-C-4582 00 KAIG3-RFI-SW-C-4582-00
KAIG3-RFI-SW-C-4581 00 KAIG3-RFI-SW-C-4581-00
KAIG3-RFI-SW-C-4574 00 KAIG3-RFI-SW-C-4574-00
KAIG3-RFI-SW-C-4573 00 KAIG3-RFI-SW-C-4573-00
KAIG3-RFI-SW-C-4572 00 KAIG3-RFI-SW-C-4572-00
KAIG3-RFI-WG-S-6900 00 KAIG3-RFI-WG-S-6900-00
KAIG3-RFI-SW-C-4571 00 KAIG3-RFI-SW-C-4571-00
KAIG3-RFI-SW-C-4570 00 KAIG3-RFI-SW-C-4570-00
KAIG3-RFI-SW-C-4569 00 KAIG3-RFI-SW-C-4569-00
KAIG3-RFI-WG-SU-2339 00 KAIG3-RFI-WG-SU-2339-00
KAIG3-RFI-SW-C-4565 00 KAIG3-RFI-SW-C-4565-00
KAIG3-RFI-SW-SU-2325 00 KAIG3-RFI-SW-SU-2325-00
KAIG3-RFI-PG-S-6897 00 KAIG3-RFI-PG-S-6897-00
KAIG3-RFI-SW-S-6896 00 KAIG3-RFI-SW-S-6896-00
KAIG3-RFI-SW-C-4564 00 KAIG3-RFI-SW-C-4564-00
KAIG3-RFI-SG-S-6873 00 KAIG3-RFI-SG-S-6873-00
KAIG3-RFI-MC-C-4520 00 KAIG3-RFI-MC-C-4520-00
KAIG3-RFI-SW-C-4563 00 KAIG3-RFI-SW-C-4563-00
KAIG3-RFI-WG-C-4288 01 KAIG3-RFI-WG-C-4288-01
KAIG3-RFI-SW-C-4560 00 KAIG3-RFI-SW-C-4560-00
KAIG3-RFI-MC-C-4547 00 KAIG3-RFI-MC-C-4547-00
KAIG3-RFI-SW-C-4559 00 KAIG3-RFI-SW-C-4559-00
KAIG3-RFI-TB-C-4568 00 KAIG3-RFI-TB-C-4568-00
KAIG3-RFI-CO-C-4552 00 KAIG3-RFI-CO-C-4552-00
KAIG3-RFI-PG-C-4567 00 KAIG3-RFI-PG-C-4567-00
KAIG3-RFI-WG-C-4566 00 KAIG3-RFI-WG-C-4566-00
KAIG3-RFI-WG-C-4543 00 KAIG3-RFI-WG-C-4543-00
KAIG3-RFI-CC-SU-2335 00 KAIG3-RFI-CC-SU-2335-00
KAIG3-RFI-CO-S-6876 00 KAIG3-RFI-CO-S-6876-00
KAIG3-RFI-CO-S-6882 00 KAIG3-RFI-CO-S-6882-00
KAIG3-RFI-CC-S-6883 00 KAIG3-RFI-CC-S-6883-00
KAIG3-RFI-CC-S-6884 00 KAIG3-RFI-CC-S-6884-00
KAIG3-RFI-CC-S-6885 00 KAIG3-RFI-CC-S-6885-00
KAIG3-RFI-MC-SU-2332 00 KAIG3-RFI-MC-SU-2332-00
KAIG3-RFI-MC-S-6875 00 KAIG3-RFI-MC-S-6875-00
KAIG3-RFI-MC-S-6874 00 KAIG3-RFI-MC-S-6874-00
KAIG3-RFI-CO-S-6878 00 KAIG3-RFI-CO-S-6878-00
KAIG3-RFI-PC-LC-0526 00 KAIG3-RFI-PC-LC-0526-00
KAIG3-RFI-PC-LC-0525 00 KAIG3-RFI-PC-LC-0525-00
KAIG3-RFI-CC-LC-0520 00 KAIG3-RFI-CC-LC-0520-00
KAIG3-RFI-CC-LC-0507 00 KAIG3-RFI-CC-LC-0507-00
KAIG3-RFI-SW-C-4529 00 KAIG3-RFI-SW-C-4529-00
KAIG3-RFI-SW-C-4528 00 KAIG3-RFI-SW-C-4528-00
KAIG3-RFI-SG-LC-0527 00 KAIG3-RFI-SG-LC-0527-00
KAIG3-RFI-SW-LS-1294 00 KAIG3-RFI-SW-LS-1294-00
KAIG3-RFI-SW-LS-1293 00 KAIG3-RFI-SW-LS-1293-00
KAIG3-RFI-SW-C-4558 00 KAIG3-RFI-SW-C-4558-00
KAIG3-RFI-SW-C-4557 00 KAIG3-RFI-SW-C-4557-00
KAIG3-RFI-SW-C-4556 00 KAIG3-RFI-SW-C-4556-00
KAIG3-RFI-SW-C-4555 00 KAIG3-RFI-SW-C-4555-00
KAIG3-RFI-SW-C-4546 00 KAIG3-RFI-SW-C-4546-00
KAIG3-RFI-SW-C-4498 00 KAIG3-RFI-SW-C-4498-00
KAIG3-RFI-PC-SU-2333 00 KAIG3-RFI-PC-SU-2333-00
KAIG3-RFI-SW-C-4496 00 KAIG3-RFI-SW-C-4496-00
KAIG3-RFI-CO-SU-2334 00 KAIG3-RFI-CO-SU-2334-00
KAIG3-RFI-SW-C-4495 00 KAIG3-RFI-SW-C-4495-00
KAIG3-RFI-SW-C-4494 00 KAIG3-RFI-SW-C-4494-00
KAIG3-RFI-PC-S-6879 00 KAIG3-RFI-PC-S-6879-00
KAIG3-RFI-PC-S-6880 00 KAIG3-RFI-PC-S-6880-00
KAIG3-RFI-PC-S-6881 00 KAIG3-RFI-PC-S-6881-00
KAIG3-RFI-LM-C-4521 00 KAIG3-RFI-LM-C-4521-00
KAIG3-RFI-MC-C-4512 00 KAIG3-RFI-MC-C-4512-00
KAIG3-RFI-SW-LS-1333 00 KAIG3-RFI-SW-LS-1333-00
KAIG3-RFI-WG-LS-1334 00 KAIG3-RFI-WG-LS-1334-00
KAIG3-RFI-SW-LS-1332 00 KAIG3-RFI-SW-LS-1332-00
KAIG3-RFI-SW-LS-1331 00 KAIG3-RFI-SW-LS-1331-00
KAIG3-RFI-SW-C-4544 00 KAIG3-RFI-SW-C-4544-00
KAIG3-RFI-SW-C-4540 00 KAIG3-RFI-SW-C-4540-00
KAIG3-RFI-SW-C-4539 00 KAIG3-RFI-SW-C-4539-00
KAIG3-RFI-SW-C-4538 00 KAIG3-RFI-SW-C-4538-00
KAIG3-RFI-SW-S-6872 00 KAIG3-RFI-SW-S-6872-00
KAIG3-RFI-SW-C-4537 00 KAIG3-RFI-SW-C-4537-00
KAIG3-RFI-SW-C-4536 00 KAIG3-RFI-SW-C-4536-00
KAIG3-RFI-SW-C-4535 00 KAIG3-RFI-SW-C-4535-00
KAIG3-RFI-SW-C-4534 00 KAIG3-RFI-SW-C-4534-00
KAIG3-RFI-SW-C-4533 00 KAIG3-RFI-SW-C-4533-00
KAIG3-RFI-SW-C-4532 00 KAIG3-RFI-SW-C-4532-00
KAIG3-RFI-SW-C-4531 00 KAIG3-RFI-SW-C-4531-00
KAIG3-RFI-SW-C-4530 00 KAIG3-RFI-SW-C-4530-00
KAIG3-RFI-PG-C-4542 00 KAIG3-RFI-PG-C-4542-00
KAIG3-RFI-PA-C-4526 00 KAIG3-RFI-PA-C-4526-00
KAIG3-RFI-CO-S-6688 00 KAIG3-RFI-CO-S-6688-00
KAIG3-RFI-SW-C-4525 00 KAIG3-RFI-SW-C-4525-00
KAIG3-RFI-SW-C-4524 00 KAIG3-RFI-SW-C-4524-00
KAIG3-RFI-SW-C-4511 00 KAIG3-RFI-SW-C-4511-00
KAIG3-RFI-SW-C-4510 00 KAIG3-RFI-SW-C-4510-00
KAIG3-RFI-SW-C-4509 00 KAIG3-RFI-SW-C-4509-00
KAIG3-RFI-SW-C-4508 00 KAIG3-RFI-SW-C-4508-00
KAIG3-RFI-SW-C-4507 00 KAIG3-RFI-SW-C-4507-00
KAIG3-RFI-SW-C-4506 00 KAIG3-RFI-SW-C-4506-00
KAIG3-RFI-SW-C-4505 00 KAIG3-RFI-SW-C-4505-00
KAIG3-RFI-SW-C-4504 00 KAIG3-RFI-SW-C-4504-00
KAIG3-RFI-SW-C-4503 00 KAIG3-RFI-SW-C-4503-00
KAIG3-RFI-SW-C-4502 00 KAIG3-RFI-SW-C-4502-00
KAIG3-RFI-SW-C-4501 00 KAIG3-RFI-SW-C-4501-00
KAIG3-RFI-SW-C-4500 00 KAIG3-RFI-SW-C-4500-00
KAIG3-RFI-SW-C-4499 00 KAIG3-RFI-SW-C-4499-00
KAIG3-RFI-SW-C-4497 00 KAIG3-RFI-SW-C-4497-00
KAIG3-RFI-SW-C-4493 00 KAIG3-RFI-SW-C-4493-00
KAIG3-RFI-SW-C-4519 00 KAIG3-RFI-SW-C-4519-00
KAIG3-RFI-SW-C-4518 00 KAIG3-RFI-SW-C-4518-00
KAIG3-RFI-SW-C-4517 00 KAIG3-RFI-SW-C-4517-00
KAIG3-RFI-SW-C-4516 00 KAIG3-RFI-SW-C-4516-00
KAIG3-RFI-CO-SS-0120 00 KAIG3-RFI-CO-SS-0120-00
KAIG3-RFI-TT-S-6533 01 KAIG3-RFI-TT-S-6533-01
KAIG3-RFI-MC-S-6869 00 KAIG3-RFI-MC-S-6869-00
KAIG3-RFI-MC-S-6871 00 KAIG3-RFI-MC-S-6871-00
KAIG3-RFI-SG-S-6850 00 KAIG3-RFI-SG-S-6850-00
KAIG3-RFI-MC-S-6866 00 KAIG3-RFI-MC-S-6866-00
KAIG3-RFI-CO-S-6867 00 KAIG3-RFI-CO-S-6867-00
KAIG3-RFI-SG-S-6849 00 KAIG3-RFI-SG-S-6849-00
KAIG3-RFI-CO-S-6868 00 KAIG3-RFI-CO-S-6868-00
KAIG3-RFI-SG-SU-2324 00 KAIG3-RFI-SG-SU-2324-00
KAIG3-RFI-SG-SU-2323 00 KAIG3-RFI-SG-SU-2323-00
KAIG3-RFI-SG-C-4527 00 KAIG3-RFI-SG-C-4527-00
KAIG3-RFI-WG-C-4513 00 KAIG3-RFI-WG-C-4513-00
KAIG3-RFI-WG-C-4514 00 KAIG3-RFI-WG-C-4514-00
KAIG3-RFI-LM-SU-2329 00 KAIG3-RFI-LM-SU-2329-00
KAIG3-RFI-LM-S-6860 00 KAIG3-RFI-LM-S-6860-00
KAIG3-RFI-LM-S-6861 00 KAIG3-RFI-LM-S-6861-00
KAIG3-RFI-LM-S-6862 00 KAIG3-RFI-LM-S-6862-00
KAIG3-RFI-PG-P-0210 00 KAIG3-RFI-PG-P-0210-00
KAIG3-RFI-PC-E-0420 00 KAIG3-RFI-PC-E-0420-00
KAIG3-RFI-PC-E-0419 00 KAIG3-RFI-PC-E-0419-00
KAIG3-RFI-PC-LC-0524 00 KAIG3-RFI-PC-LC-0524-00
KAIG3-RFI-PC-LC-0523 00 KAIG3-RFI-PC-LC-0523-00
KAIG3-RFI-PC-LC-0522 00 KAIG3-RFI-PC-LC-0522-00
KAIG3-RFI-PC-LC-0521 00 KAIG3-RFI-PC-LC-0521-00
KAIG3-RFI-CO-C-4484 00 KAIG3-RFI-CO-C-4484-00
KAIG3-RFI-CO-C-4481 00 KAIG3-RFI-CO-C-4481-00
KAIG3-RFI-CO-C-4482 00 KAIG3-RFI-CO-C-4482-00
KAIG3-RFI-SW-LC-0506 00 KAIG3-RFI-SW-LC-0506-00
KAIG3-RFI-ZG-C-4490 00 KAIG3-RFI-ZG-C-4490-00
KAIG3-RFI-CO-SS-0122 00 KAIG3-RFI-CO-SS-0122-00
KAIG3-RFI-TB-C-4489 00 KAIG3-RFI-TB-C-4489-00
KAIG3-RFI-CO-C-4483 00 KAIG3-RFI-CO-C-4483-00
KAIG3-RFI-LM-SU-2330 00 KAIG3-RFI-LM-SU-2330-00
KAIG3-RFI-WG-C-4488 00 KAIG3-RFI-WG-C-4488-00
KAIG3-RFI-CO-SU-2328 00 KAIG3-RFI-CO-SU-2328-00
KAIG3-RFI-CO-S-6629 01 KAIG3-RFI-CO-S-6629-01
KAIG3-RFI-WG-LS-1330 00 KAIG3-RFI-WG-LS-1330-00
KAIG3-RFI-CO-S-6857 00 KAIG3-RFI-CO-S-6857-00
KAIG3-RFI-LM-S-6864 00 KAIG3-RFI-LM-S-6864-00
KAIG3-RFI-CO-S-6858 00 KAIG3-RFI-CO-S-6858-00
KAIG3-RFI-SW-LC-0505 00 KAIG3-RFI-SW-LC-0505-00
KAIG3-RFI-WG-LS-1329 00 KAIG3-RFI-WG-LS-1329-00
KAIG3-RFI-SW-C-4492 00 KAIG3-RFI-SW-C-4492-00
KAIG3-RFI-SW-C-4491 00 KAIG3-RFI-SW-C-4491-00
KAIG3-RFI-LM-S-6791 00 KAIG3-RFI-LM-S-6791-00
KAIG3-RFI-CO-S-6851 00 KAIG3-RFI-CO-S-6851-00
KAIG3-RFI-CO-S-6852 00 KAIG3-RFI-CO-S-6852-00
KAIG3-RFI-CO-S-6853 00 KAIG3-RFI-CO-S-6853-00
KAIG3-RFI-CO-S-6854 00 KAIG3-RFI-CO-S-6854-00
KAIG3-RFI-SW-C-4487 00 KAIG3-RFI-SW-C-4487-00
KAIG3-RFI-SW-C-4486 00 KAIG3-RFI-SW-C-4486-00
KAIG3-RFI-WG-LS-1328 00 KAIG3-RFI-WG-LS-1328-00
KAIG3-RFI-SW-C-4485 00 KAIG3-RFI-SW-C-4485-00
KAIG3-RFI-SW-C-4480 00 KAIG3-RFI-SW-C-4480-00
KAIG3-RFI-SW-C-4479 00 KAIG3-RFI-SW-C-4479-00
KAIG3-RFI-SW-C-4478 00 KAIG3-RFI-SW-C-4478-00
KAIG3-RFI-SW-C-4477 00 KAIG3-RFI-SW-C-4477-00
KAIG3-RFI-CO-S-6856 00 KAIG3-RFI-CO-S-6856-00
KAIG3-RFI-SW-C-4474 00 KAIG3-RFI-SW-C-4474-00
KAIG3-RFI-SW-C-4473 00 KAIG3-RFI-SW-C-4473-00
KAIG3-RFI-LM-P-0209 00 KAIG3-RFI-LM-P-0209-00
KAIG3-RFI-CO-C-4476 00 KAIG3-RFI-CO-C-4476-00
KAIG3-RFI-MC-C-4475 00 KAIG3-RFI-MC-C-4475-00
KAIG3-RFI-CO-C-4473 00 KAIG3-RFI-CO-C-4473-00
KAIG3-RFI-CO-C-4474 00 KAIG3-RFI-CO-C-4474-00
KAIG3-RFI-CO-C-4451 00 KAIG3-RFI-CO-C-4451-00
KAIG3-RFI-CO-SU-2326 00 KAIG3-RFI-CO-SU-2326-00
KAIG3-RFI-CO-SU-2322 00 KAIG3-RFI-CO-SU-2322-00
KAIG3-RFI-MC-SU-2327 00 KAIG3-RFI-MC-SU-2327-00
KAIG3-RFI-MC-S-6855 00 KAIG3-RFI-MC-S-6855-00
KAIG3-RFI-SW-LS-1327 00 KAIG3-RFI-SW-LS-1327-00
KAIG3-RFI-CO-S-6409 00 KAIG3-RFI-CO-S-6409-00
KAIG3-RFI-SW-LS-1326 00 KAIG3-RFI-SW-LS-1326-00
KAIG3-RFI-CO-S-6847 00 KAIG3-RFI-CO-S-6847-00
KAIG3-RFI-SW-C-4470 00 KAIG3-RFI-SW-C-4470-00
KAIG3-RFI-SW-C-4466 00 KAIG3-RFI-SW-C-4466-00
KAIG3-RFI-CO-S-6800 00 KAIG3-RFI-CO-S-6800-00
KAIG3-RFI-SW-C-4465 00 KAIG3-RFI-SW-C-4465-00
KAIG3-RFI-CO-S-6843 00 KAIG3-RFI-CO-S-6843-00
KAIG3-RFI-CO-S-6844 00 KAIG3-RFI-CO-S-6844-00
KAIG3-RFI-SW-C-4464 00 KAIG3-RFI-SW-C-4464-00
KAIG3-RFI-CO-S-6845 00 KAIG3-RFI-CO-S-6845-00
KAIG3-RFI-SW-C-4463 00 KAIG3-RFI-SW-C-4463-00
KAIG3-RFI-CO-S-6846 00 KAIG3-RFI-CO-S-6846-00
KAIG3-RFI-SW-C-4462 00 KAIG3-RFI-SW-C-4462-00
KAIG3-RFI-SW-C-4461 00 KAIG3-RFI-SW-C-4461-00
KAIG3-RFI-SW-C-4460 00 KAIG3-RFI-SW-C-4460-00
KAIG3-RFI-SW-C-4459 00 KAIG3-RFI-SW-C-4459-00
KAIG3-RFI-SW-C-4458 00 KAIG3-RFI-SW-C-4458-00
KAIG3-RFI-SW-C-4457 00 KAIG3-RFI-SW-C-4457-00
KAIG3-RFI-SW-C-4456 00 KAIG3-RFI-SW-C-4456-00
KAIG3-RFI-SW-C-4455 00 KAIG3-RFI-SW-C-4455-00
KAIG3-RFI-SW-C-4454 00 KAIG3-RFI-SW-C-4454-00
KAIG3-RFI-SW-C-4453 00 KAIG3-RFI-SW-C-4453-00
KAIG3-RFI-SW-C-4452 00 KAIG3-RFI-SW-C-4452-00
KAIG3-RFI-SW-C-4443 00 KAIG3-RFI-SW-C-4443-00
KAIG3-RFI-SW-C-4442 00 KAIG3-RFI-SW-C-4442-00
KAIG3-RFI-SW-C-4441 00 KAIG3-RFI-SW-C-4441-00
KAIG3-RFI-SW-C-4440 00 KAIG3-RFI-SW-C-4440-00
KAIG3-RFI-SW-C-4439 00 KAIG3-RFI-SW-C-4439-00
KAIG3-RFI-SW-C-4438 00 KAIG3-RFI-SW-C-4438-00
KAIG3-RFI-WG-C-4469 00 KAIG3-RFI-WG-C-4469-00
KAIG3-RFI-ZG-C-4468 00 KAIG3-RFI-ZG-C-4468-00
KAIG3-RFI-SG-C-4467 00 KAIG3-RFI-SG-C-4467-00
KAIG3-RFI-WG-C-4450 00 KAIG3-RFI-WG-C-4450-00
KAIG3-RFI-PG-SU-2321 00 KAIG3-RFI-PG-SU-2321-00
KAIG3-RFI-PG-S-6848 00 KAIG3-RFI-PG-S-6848-00
KAIG3-RFI-PG-S-6840 00 KAIG3-RFI-PG-S-6840-00
KAIG3-RFI-PG-C-4449 00 KAIG3-RFI-PG-C-4449-00
KAIG3-RFI-PG-C-4448 00 KAIG3-RFI-PG-C-4448-00
KAIG3-RFI-PG-C-4447 00 KAIG3-RFI-PG-C-4447-00
KAIG3-RFI-PG-C-4446 00 KAIG3-RFI-PG-C-4446-00
KAIG3-RFI-BO-S-0448 01 KAIG3-RFI-BO-S-0448-01
KAIG3-RFI-PG-E-0147 00 KAIG3-RFI-PG-E-0147-00
KAIG3-RFI-SW-C-4437 00 KAIG3-RFI-SW-C-4437-00
KAIG3-RFI-PC-E-0418 00 KAIG3-RFI-PC-E-0418-00
KAIG3-RFI-CO-E-0417 00 KAIG3-RFI-CO-E-0417-00
KAIG3-RFI-SW-C-4436 00 KAIG3-RFI-SW-C-4436-00
KAIG3-RFI-SW-C-4435 00 KAIG3-RFI-SW-C-4435-00
KAIG3-RFI-ZG-S-6839 00 KAIG3-RFI-ZG-S-6839-00
KAIG3-RFI-TB-S-6838 00 KAIG3-RFI-TB-S-6838-00
KAIG3-RFI-PC-LC-0519 00 KAIG3-RFI-PC-LC-0519-00
KAIG3-RFI-PC-LC-0518 00 KAIG3-RFI-PC-LC-0518-00
KAIG3-RFI-TB-S-6837 00 KAIG3-RFI-TB-S-6837-00
KAIG3-RFI-SW-S-6836 00 KAIG3-RFI-SW-S-6836-00
KAIG3-RFI-ZG-SU-2320 00 KAIG3-RFI-ZG-SU-2320-00
KAIG3-RFI-TB-SU-2319 00 KAIG3-RFI-TB-SU-2319-00
KAIG3-RFI-TB-SU-2318 00 KAIG3-RFI-TB-SU-2318-00
KAIG3-RFI-SW-SU-2317 00 KAIG3-RFI-SW-SU-2317-00
KAIG3-RFI-WG-C-4445 00 KAIG3-RFI-WG-C-4445-00
KAIG3-RFI-WG-C-4378 00 KAIG3-RFI-WG-C-4378-00
KAIG3-RFI-TG-S-6795 00 KAIG3-RFI-TG-S-6795-00
KAIG3-RFI-SG-S-6814 00 KAIG3-RFI-SG-S-6814-00
KAIG3-RFI-ZG-C-4377 00 KAIG3-RFI-ZG-C-4377-00
KAIG3-RFI-WG-C-4370-00 00 KAIG3-RFI-WG-C-4370-00-00
KAIG3-RFI-TB-C-4371 00 KAIG3-RFI-TB-C-4371-00
KAIG3-RFI-LM-LC-0515 00 KAIG3-RFI-LM-LC-0515-00
KAIG3-RFI-PG-C-4376 00 KAIG3-RFI-PG-C-4376-00
KAIG3-RFI-CO-SS-0116 00 KAIG3-RFI-CO-SS-0116-00
KAIG3-RFI-CO-SU-2316 00 KAIG3-RFI-CO-SU-2316-00
KAIG3-RFI-CC-C-4425 00 KAIG3-RFI-CC-C-4425-00
KAIG3-RFI-CO-C-4434 00 KAIG3-RFI-CO-C-4434-00
KAIG3-RFI-LM-C-4362 00 KAIG3-RFI-LM-C-4362-00
KAIG3-RFI-MC-C-4424 00 KAIG3-RFI-MC-C-4424-00
KAIG3-RFI-MC-C-4423 00 KAIG3-RFI-MC-C-4423-00
KAIG3-RFI-CO-S-6663 01 KAIG3-RFI-CO-S-6663-01
KAIG3-RFI-CO-S-6710 01 KAIG3-RFI-CO-S-6710-01
KAIG3-RFI-MC-S-6842 00 KAIG3-RFI-MC-S-6842-00
KAIG3-RFI-CO-S-6841 00 KAIG3-RFI-CO-S-6841-00
KAIG3-RFI-LM-S-6835 00 KAIG3-RFI-LM-S-6835-00
KAIG3-RFI-CO-S-6833 00 KAIG3-RFI-CO-S-6833-00
KAIG3-RFI-PG-S-6813 00 KAIG3-RFI-PG-S-6813-00
KAIG3-RFI-CC-S-6834 00 KAIG3-RFI-CC-S-6834-00
KAIG3-RFI-CO-S-6830 00 KAIG3-RFI-CO-S-6830-00
KAIG3-RFI-CO-S-6831 00 KAIG3-RFI-CO-S-6831-00
KAIG3-RFI-SW-LS-1325 00 KAIG3-RFI-SW-LS-1325-00
KAIG3-RFI-SW-LS-1324 00 KAIG3-RFI-SW-LS-1324-00
KAIG3-RFI-SW-C-4433 00 KAIG3-RFI-SW-C-4433-00
KAIG3-RFI-SW-C-4432 00 KAIG3-RFI-SW-C-4432-00
KAIG3-RFI-SW-C-4431 00 KAIG3-RFI-SW-C-4431-00
KAIG3-RFI-SW-C-4430 00 KAIG3-RFI-SW-C-4430-00
KAIG3-RFI-SW-C-4429 00 KAIG3-RFI-SW-C-4429-00
KAIG3-RFI-SW-C-4428 00 KAIG3-RFI-SW-C-4428-00
KAIG3-RFI-SW-C-4427 00 KAIG3-RFI-SW-C-4427-00
KAIG3-RFI-SW-C-4426 00 KAIG3-RFI-SW-C-4426-00
KAIG3-RFI-SW-C-4422 00 KAIG3-RFI-SW-C-4422-00
KAIG3-RFI-SW-C-4421 00 KAIG3-RFI-SW-C-4421-00
KAIG3-RFI-TG-SS-0119 00 KAIG3-RFI-TG-SS-0119-00
KAIG3-RFI-CO-SS-0117 00 KAIG3-RFI-CO-SS-0117-00
KAIG3-RFI-SW-C-4388 00 KAIG3-RFI-SW-C-4388-00
KAIG3-RFI-SW-C-4387 00 KAIG3-RFI-SW-C-4387-00
KAIG3-RFI-SW-C-4386 00 KAIG3-RFI-SW-C-4386-00
KAIG3-RFI-SW-C-4385 00 KAIG3-RFI-SW-C-4385-00
KAIG3-RFI-SW-C-3259 02 KAIG3-RFI-SW-C-3259-02
KAIG3-RFI-SW-C-4420 00 KAIG3-RFI-SW-C-4420-00
KAIG3-RFI-SW-C-4419 00 KAIG3-RFI-SW-C-4419-00
KAIG3-RFI-SW-C-4418 00 KAIG3-RFI-SW-C-4418-00
KAIG3-RFI-SW-C-4416 00 KAIG3-RFI-SW-C-4416-00
KAIG3-RFI-SW-C-4415 00 KAIG3-RFI-SW-C-4415-00
KAIG3-RFI-SW-C-4414 00 KAIG3-RFI-SW-C-4414-00
KAIG3-RFI-SW-C-4413 00 KAIG3-RFI-SW-C-4413-00
KAIG3-RFI-SW-C-4412 00 KAIG3-RFI-SW-C-4412-00
KAIG3-RFI-SW-C-4411 00 KAIG3-RFI-SW-C-4411-00
KAIG3-RFI-SW-C-4410 00 KAIG3-RFI-SW-C-4410-00
KAIG3-RFI-SW-C-4409 00 KAIG3-RFI-SW-C-4409-00
KAIG3-RFI-SW-C-4408 00 KAIG3-RFI-SW-C-4408-00
KAIG3-RFI-SW-C-4407 00 KAIG3-RFI-SW-C-4407-00
KAIG3-RFI-SW-C-4406 00 KAIG3-RFI-SW-C-4406-00
KAIG3-RFI-SW-C-4405 00 KAIG3-RFI-SW-C-4405-00
KAIG3-RFI-SW-C-4404 00 KAIG3-RFI-SW-C-4404-00
KAIG3-RFI-SW-C-4403 00 KAIG3-RFI-SW-C-4403-00
KAIG3-RFI-SW-C-4402 00 KAIG3-RFI-SW-C-4402-00
KAIG3-RFI-SW-C-4401 00 KAIG3-RFI-SW-C-4401-00
KAIG3-RFI-SW-C-4400 00 KAIG3-RFI-SW-C-4400-00
KAIG3-RFI-SW-C-4399 00 KAIG3-RFI-SW-C-4399-00
KAIG3-RFI-SW-C-4398 00 KAIG3-RFI-SW-C-4398-00
KAIG3-RFI-SW-C-4397 00 KAIG3-RFI-SW-C-4397-00
KAIG3-RFI-SW-C-4396 00 KAIG3-RFI-SW-C-4396-00
KAIG3-RFI-SW-C-4395 00 KAIG3-RFI-SW-C-4395-00
KAIG3-RFI-SW-C-4394 00 KAIG3-RFI-SW-C-4394-00
KAIG3-RFI-SW-C-4393 00 KAIG3-RFI-SW-C-4393-00
KAIG3-RFI-SW-C-4392 00 KAIG3-RFI-SW-C-4392-00
KAIG3-RFI-SW-C-4391 00 KAIG3-RFI-SW-C-4391-00
KAIG3-RFI-SW-C-4390 00 KAIG3-RFI-SW-C-4390-00
KAIG3-RFI-SW-C-4389 00 KAIG3-RFI-SW-C-4389-00
KAIG3-RFI-SW-C-4239 01 KAIG3-RFI-SW-C-4239-01
KAIG3-RFI-CO-SU-2315 00 KAIG3-RFI-CO-SU-2315-00
KAIG3-RFI-CO-S-6821 00 KAIG3-RFI-CO-S-6821-00
KAIG3-RFI-CO-S-6822 00 KAIG3-RFI-CO-S-6822-00
KAIG3-RFI-CO-S-6823 00 KAIG3-RFI-CO-S-6823-00
KAIG3-RFI-CO-S-6825 00 KAIG3-RFI-CO-S-6825-00
KAIG3-RFI-PC-S-6826 00 KAIG3-RFI-PC-S-6826-00
KAIG3-RFI-PC-S-6827 00 KAIG3-RFI-PC-S-6827-00
KAIG3-RFI-PC-S-6828 00 KAIG3-RFI-PC-S-6828-00
KAIG3-RFI-MC-C-4417 00 KAIG3-RFI-MC-C-4417-00
KAIG3-RFI-MC-C-4382 00 KAIG3-RFI-MC-C-4382-00
KAIG3-RFI-CO-C-4383 00 KAIG3-RFI-CO-C-4383-00
KAIG3-RFI-CO-C-4299 00 KAIG3-RFI-CO-C-4299-00
KAIG3-RFI-CO-SS-0115 00 KAIG3-RFI-CO-SS-0115-00
KAIG3-RFI-CO-SS-0114 00 KAIG3-RFI-CO-SS-0114-00
KAIG3-RFI-CO-SS-0113 00 KAIG3-RFI-CO-SS-0113-00
KAIG3-RFI-CO-SU-2314 00 KAIG3-RFI-CO-SU-2314-00
KAIG3-RFI-CO-SU-2313 00 KAIG3-RFI-CO-SU-2313-00
KAIG3-RFI-CO-SU-2312 00 KAIG3-RFI-CO-SU-2312-00
KAIG3-RFI-CO-SU-2309 00 KAIG3-RFI-CO-SU-2309-00
KAIG3-RFI-CO-SU-2310 00 KAIG3-RFI-CO-SU-2310-00
KAIG3-RFI-CO-SU-2311 00 KAIG3-RFI-CO-SU-2311-00
KAIG3-RFI-CO-S-6820 00 KAIG3-RFI-CO-S-6820-00
KAIG3-RFI-CO-S-6818 00 KAIG3-RFI-CO-S-6818-00
KAIG3-RFI-CO-S-6819 00 KAIG3-RFI-CO-S-6819-00
KAIG3-RFI-CO-S-6816 00 KAIG3-RFI-CO-S-6816-00
KAIG3-RFI-CO-S-6817 00 KAIG3-RFI-CO-S-6817-00
KAIG3-RFI-CO-S-6812 00 KAIG3-RFI-CO-S-6812-00
KAIG3-RFI-CO-S-6815 00 KAIG3-RFI-CO-S-6815-00
KAIG3-RFI-CO-S-6806 00 KAIG3-RFI-CO-S-6806-00
KAIG3-RFI-CO-S-6807 00 KAIG3-RFI-CO-S-6807-00
KAIG3-RFI-CO-S-6808 00 KAIG3-RFI-CO-S-6808-00
KAIG3-RFI-CO-S-6809 00 KAIG3-RFI-CO-S-6809-00
KAIG3-RFI-CC-S-6811 00 KAIG3-RFI-CC-S-6811-00
KAIG3-RFI-CO-S-6803 00 KAIG3-RFI-CO-S-6803-00
KAIG3-RFI-CO-S-6639 00 KAIG3-RFI-CO-S-6639-00
KAIG3-RFI-CO-S-6804 00 KAIG3-RFI-CO-S-6804-00
KAIG3-RFI-CO-S-6805 00 KAIG3-RFI-CO-S-6805-00
KAIG3-RFI-CO-S-6802 00 KAIG3-RFI-CO-S-6802-00
KAIG3-RFI-CO-S-6801 00 KAIG3-RFI-CO-S-6801-00
KAIG3-RFI-CO-S-6727 00 KAIG3-RFI-CO-S-6727-00
KAIG3-RFI-MC-S-6777 00 KAIG3-RFI-MC-S-6777-00
KAIG3-RFI-CC-S-6725 00 KAIG3-RFI-CC-S-6725-00
KAIG3-RFI-CC-S-6623 00 KAIG3-RFI-CC-S-6623-00
KAIG3-RFI-CC-S-6572 00 KAIG3-RFI-CC-S-6572-00
KAIG3-RFI-CC-S-6635 00 KAIG3-RFI-CC-S-6635-00
KAIG3-RFI-CO-S-6707 00 KAIG3-RFI-CO-S-6707-00
KAIG3-RFI-SW-LS-1323 00 KAIG3-RFI-SW-LS-1323-00
KAIG3-RFI-SW-LS-1322 00 KAIG3-RFI-SW-LS-1322-00
KAIG3-RFI-SW-C-4384 00 KAIG3-RFI-SW-C-4384-00
KAIG3-RFI-SW-C-4381 00 KAIG3-RFI-SW-C-4381-00
KAIG3-RFI-SW-C-4380 00 KAIG3-RFI-SW-C-4380-00
KAIG3-RFI-SW-C-4375 00 KAIG3-RFI-SW-C-4375-00
KAIG3-RFI-SW-C-4374 00 KAIG3-RFI-SW-C-4374-00
KAIG3-RFI-SW-C-4373 00 KAIG3-RFI-SW-C-4373-00
KAIG3-RFI-SW-C-4372 00 KAIG3-RFI-SW-C-4372-00
KAIG3-RFI-CO-SS-0112 00 KAIG3-RFI-CO-SS-0112-00
KAIG3-RFI-CO-SS-0111 00 KAIG3-RFI-CO-SS-0111-00
KAIG3-RFI-CO-SS-0110 00 KAIG3-RFI-CO-SS-0110-00
KAIG3-RFI-SG-P-0208 00 KAIG3-RFI-SG-P-0208-00
KAIG3-RFI-SW-C-4360 00 KAIG3-RFI-SW-C-4360-00
KAIG3-RFI-SW-C-4359 00 KAIG3-RFI-SW-C-4359-00
KAIG3-RFI-SW-C-4358 00 KAIG3-RFI-SW-C-4358-00
KAIG3-RFI-SW-C-4357 00 KAIG3-RFI-SW-C-4357-00
KAIG3-RFI-SW-C-4356 00 KAIG3-RFI-SW-C-4356-00
KAIG3-RFI-SW-C-4355 00 KAIG3-RFI-SW-C-4355-00
KAIG3-RFI-SW-C-4354 00 KAIG3-RFI-SW-C-4354-00
KAIG3-RFI-SW-C-4353 00 KAIG3-RFI-SW-C-4353-00
KAIG3-RFI-SW-C-4352 00 KAIG3-RFI-SW-C-4352-00
KAIG3-RFI-SW-C-4349 00 KAIG3-RFI-SW-C-4349-00
KAIG3-RFI-SW-C-4347 00 KAIG3-RFI-SW-C-4347-00
KAIG3-RFI-SW-C-4345 00 KAIG3-RFI-SW-C-4345-00
KAIG3-RFI-SW-C-4344 00 KAIG3-RFI-SW-C-4344-00
KAIG3-RFI-MC-C-4366 00 KAIG3-RFI-MC-C-4366-00
KAIG3-RFI-MC-C-4367 00 KAIG3-RFI-MC-C-4367-00
KAIG3-RFI-CO-C-4339 00 KAIG3-RFI-CO-C-4339-00
KAIG3-RFI-SW-C-3802 01 KAIG3-RFI-SW-C-3802-01
KAIG3-RFI-MC-C-4337 00 KAIG3-RFI-MC-C-4337-00
KAIG3-RFI-MC-C-4336 00 KAIG3-RFI-MC-C-4336-00
KAIG3-RFI-CO-SU-2307 00 KAIG3-RFI-CO-SU-2307-00
KAIG3-RFI-CO-SU-2306 00 KAIG3-RFI-CO-SU-2306-00
KAIG3-RFI-CO-SU-2308 00 KAIG3-RFI-CO-SU-2308-00
KAIG3-RFI-CO-S-6787 00 KAIG3-RFI-CO-S-6787-00
KAIG3-RFI-CO-S-6789 00 KAIG3-RFI-CO-S-6789-00
KAIG3-RFI-CO-S-6788 00 KAIG3-RFI-CO-S-6788-00
KAIG3-RFI-CO-S-6790 00 KAIG3-RFI-CO-S-6790-00
KAIG3-RFI-CO-S-6796 00 KAIG3-RFI-CO-S-6796-00
KAIG3-RFI-CO-S-6797 00 KAIG3-RFI-CO-S-6797-00
KAIG3-RFI-CO-S-6799 00 KAIG3-RFI-CO-S-6799-00
KAIG3-RFI-CO-S-6785 00 KAIG3-RFI-CO-S-6785-00
KAIG3-RFI-CO-S-6775 00 KAIG3-RFI-CO-S-6775-00
KAIG3-RFI-CO-S-6773 00 KAIG3-RFI-CO-S-6773-00
KAIG3-RFI-CO-S-6774 00 KAIG3-RFI-CO-S-6774-00
KAIG3-RFI-CO-S-6772 00 KAIG3-RFI-CO-S-6772-00
KAIG3-RFI-TB-S-6794 00 KAIG3-RFI-TB-S-6794-00
KAIG3-RFI-TB-S-6793 00 KAIG3-RFI-TB-S-6793-00
KAIG3-RFI-TB-S-6792 00 KAIG3-RFI-TB-S-6792-00
KAIG3-RFI-TB-C-4365 00 KAIG3-RFI-TB-C-4365-00
KAIG3-RFI-WG-C-4364 00 KAIG3-RFI-WG-C-4364-00
KAIG3-RFI-WG-C-4363 00 KAIG3-RFI-WG-C-4363-00
KAIG3-RFI-AG-S-6784 00 KAIG3-RFI-AG-S-6784-00
KAIG3-RFI-AG-S-6783 00 KAIG3-RFI-AG-S-6783-00
KAIG3-RFI-AG-S-6782 00 KAIG3-RFI-AG-S-6782-00
KAIG3-RFI-PG-C-4361 00 KAIG3-RFI-PG-C-4361-00
KAIG3-RFI-PG-S-6781 00 KAIG3-RFI-PG-S-6781-00
KAIG3-RFI-PG-C-4332 00 KAIG3-RFI-PG-C-4332-00
KAIG3-RFI-TG-S-6780 00 KAIG3-RFI-TG-S-6780-00
KAIG3-RFI-TG-P-0207 00 KAIG3-RFI-TG-P-0207-00
KAIG3-RFI-SW-C-4334 00 KAIG3-RFI-SW-C-4334-00
KAIG3-RFI-SW-C-4333 00 KAIG3-RFI-SW-C-4333-00
KAIG3-RFI-SW-C-4444 00 KAIG3-RFI-SW-C-4444-00
KAIG3-RFI-SW-C-4351 00 KAIG3-RFI-SW-C-4351-00
KAIG3-RFI-SW-C-4350 00 KAIG3-RFI-SW-C-4350-00
KAIG3-RFI-SW-C-4348 00 KAIG3-RFI-SW-C-4348-00
KAIG3-RFI-SW-C-4346 00 KAIG3-RFI-SW-C-4346-00
KAIG3-RFI-SW-C-4343 00 KAIG3-RFI-SW-C-4343-00
KAIG3-RFI-SW-C-4342 00 KAIG3-RFI-SW-C-4342-00
KAIG3-RFI-SW-C-4341 00 KAIG3-RFI-SW-C-4341-00
KAIG3-RFI-SW-C-4340 00 KAIG3-RFI-SW-C-4340-00
KAIG3-RFI-SW-C-4325 00 KAIG3-RFI-SW-C-4325-00
KAIG3-RFI-SW-C-4324 00 KAIG3-RFI-SW-C-4324-00
KAIG3-RFI-SW-C-4323 00 KAIG3-RFI-SW-C-4323-00
KAIG3-RFI-SW-C-4322 00 KAIG3-RFI-SW-C-4322-00
KAIG3-RFI-SW-C-4321 00 KAIG3-RFI-SW-C-4321-00
KAIG3-RFI-SW-C-4320 00 KAIG3-RFI-SW-C-4320-00
KAIG3-RFI-SW-C-4319 00 KAIG3-RFI-SW-C-4319-00
KAIG3-RFI-SW-C-4318 00 KAIG3-RFI-SW-C-4318-00
KAIG3-RFI-SW-C-4317 00 KAIG3-RFI-SW-C-4317-00
KAIG3-RFI-SW-C-4316 00 KAIG3-RFI-SW-C-4316-00
KAIG3-RFI-SW-C-4315 00 KAIG3-RFI-SW-C-4315-00
KAIG3-RFI-SW-C-4314 00 KAIG3-RFI-SW-C-4314-00
KAIG3-RFI-SW-C-4313 00 KAIG3-RFI-SW-C-4313-00
KAIG3-RFI-SW-C-4312 00 KAIG3-RFI-SW-C-4312-00
KAIG3-RFI-SW-C-4311 00 KAIG3-RFI-SW-C-4311-00
KAIG3-RFI-SW-C-4292 00 KAIG3-RFI-SW-C-4292-00
KAIG3-RFI-TB-LC-0514 00 KAIG3-RFI-TB-LC-0514-00
KAIG3-RFI-MC-C-4297 00 KAIG3-RFI-MC-C-4297-00
KAIG3-RFI-MC-C-4298 00 KAIG3-RFI-MC-C-4298-00
KAIG3-RFI-CO-SS-0109 00 KAIG3-RFI-CO-SS-0109-00
KAIG3-RFI-CO-SS-0106 00 KAIG3-RFI-CO-SS-0106-00
KAIG3-RFI-CO-C-4287 00 KAIG3-RFI-CO-C-4287-00
KAIG3-RFI-CO-SU-2302 00 KAIG3-RFI-CO-SU-2302-00
KAIG3-RFI-CO-SU-2305 00 KAIG3-RFI-CO-SU-2305-00
KAIG3-RFI-CO-SU-2300 00 KAIG3-RFI-CO-SU-2300-00
KAIG3-RFI-CO-SU-2297 00 KAIG3-RFI-CO-SU-2297-00
KAIG3-RFI-CO-SU-2299 00 KAIG3-RFI-CO-SU-2299-00
KAIG3-RFI-CO-SS-0108 00 KAIG3-RFI-CO-SS-0108-00
KAIG3-RFI-CO-S-6769 00 KAIG3-RFI-CO-S-6769-00
KAIG3-RFI-CO-S-6770 00 KAIG3-RFI-CO-S-6770-00
KAIG3-RFI-CO-S-6762 00 KAIG3-RFI-CO-S-6762-00
KAIG3-RFI-CO-S-6763 00 KAIG3-RFI-CO-S-6763-00
KAIG3-RFI-MC-SU-2303 00 KAIG3-RFI-MC-SU-2303-00
KAIG3-RFI-MC-S-6776 00 KAIG3-RFI-MC-S-6776-00
KAIG3-RFI-CO-S-6778 00 KAIG3-RFI-CO-S-6778-00
KAIG3-RFI-CO-S-6779 00 KAIG3-RFI-CO-S-6779-00
KAIG3-RFI-CO-S-6768 00 KAIG3-RFI-CO-S-6768-00
KAIG3-RFI-CO-S-6760 00 KAIG3-RFI-CO-S-6760-00
KAIG3-RFI-CO-S-6761 00 KAIG3-RFI-CO-S-6761-00
KAIG3-RFI-WG-LS-1321 00 KAIG3-RFI-WG-LS-1321-00
KAIG3-RFI-CO-S-6765 00 KAIG3-RFI-CO-S-6765-00
KAIG3-RFI-CO-S-6766 00 KAIG3-RFI-CO-S-6766-00
KAIG3-RFI-CO-S-6767 00 KAIG3-RFI-CO-S-6767-00
KAIG3-RFI-CO-SS-0107 00 KAIG3-RFI-CO-SS-0107-00
KAIG3-RFI-WG-LS-1320 00 KAIG3-RFI-WG-LS-1320-00
KAIG3-RFI-CO-SS-0102 00 KAIG3-RFI-CO-SS-0102-00
KAIG3-RFI-CO-SS-0105 00 KAIG3-RFI-CO-SS-0105-00
KAIG3-RFI-WG-LS-1319 00 KAIG3-RFI-WG-LS-1319-00
KAIG3-RFI-CF-C-4248 00 KAIG3-RFI-CF-C-4248-00
KAIG3-RFI-MC-C-4247 00 KAIG3-RFI-MC-C-4247-00
KAIG3-RFI-MC-C-4286 00 KAIG3-RFI-MC-C-4286-00
KAIG3-RFI-CF-C-4245 00 KAIG3-RFI-CF-C-4245-00
KAIG3-RFI-CF-C-4246 00 KAIG3-RFI-CF-C-4246-00
KAIG3-RFI-LM-C-4256 00 KAIG3-RFI-LM-C-4256-00
KAIG3-RFI-LM-C-4174 00 KAIG3-RFI-LM-C-4174-00
KAIG3-RFI-TG-SU-2304 00 KAIG3-RFI-TG-SU-2304-00
KAIG3-RFI-LM-C-4255 00 KAIG3-RFI-LM-C-4255-00
KAIG3-RFI-CF-SU-2294 00 KAIG3-RFI-CF-SU-2294-00
KAIG3-RFI-ZG-C-4331 00 KAIG3-RFI-ZG-C-4331-00
KAIG3-RFI-PC-SU-2296 00 KAIG3-RFI-PC-SU-2296-00
KAIG3-RFI-PG-C-4330 00 KAIG3-RFI-PG-C-4330-00
KAIG3-RFI-PG-C-4329 00 KAIG3-RFI-PG-C-4329-00
KAIG3-RFI-PC-SU-2295 00 KAIG3-RFI-PC-SU-2295-00
KAIG3-RFI-TG-C-4328 00 KAIG3-RFI-TG-C-4328-00
KAIG3-RFI-PC-SU-2292 00 KAIG3-RFI-PC-SU-2292-00
KAIG3-RFI-PG-C-4327 00 KAIG3-RFI-PG-C-4327-00
KAIG3-RFI-CF-S-6754 00 KAIG3-RFI-CF-S-6754-00
KAIG3-RFI-CO-S-6757 00 KAIG3-RFI-CO-S-6757-00
KAIG3-RFI-PG-C-4326 00 KAIG3-RFI-PG-C-4326-00
KAIG3-RFI-CF-S-6752 00 KAIG3-RFI-CF-S-6752-00
KAIG3-RFI-CF-S-6753 00 KAIG3-RFI-CF-S-6753-00
KAIG3-RFI-CO-S-6647 01 KAIG3-RFI-CO-S-6647-01
KAIG3-RFI-CO-S-6631 01 KAIG3-RFI-CO-S-6631-01
KAIG3-RFI-CO-S-6751 00 KAIG3-RFI-CO-S-6751-00
KAIG3-RFI-CO-S-6711 00 KAIG3-RFI-CO-S-6711-00
KAIG3-RFI-CO-S-6671 00 KAIG3-RFI-CO-S-6671-00
KAIG3-RFI-SW-LS-1282 01 KAIG3-RFI-SW-LS-1282-01
KAIG3-RFI-SW-LS-1281 01 KAIG3-RFI-SW-LS-1281-01
KAIG3-RFI-SW-LS-1273 01 KAIG3-RFI-SW-LS-1273-01
KAIG3-RFI-SW-LS-1272 01 KAIG3-RFI-SW-LS-1272-01
KAIG3-RFI-SW-LS-1318 00 KAIG3-RFI-SW-LS-1318-00
KAIG3-RFI-SW-C-4310 00 KAIG3-RFI-SW-C-4310-00
KAIG3-RFI-SW-C-4306 00 KAIG3-RFI-SW-C-4306-00
KAIG3-RFI-SW-C-4305 00 KAIG3-RFI-SW-C-4305-00
KAIG3-RFI-SW-C-4304 00 KAIG3-RFI-SW-C-4304-00
KAIG3-RFI-SW-C-4303 00 KAIG3-RFI-SW-C-4303-00
KAIG3-RFI-SW-C-4302 00 KAIG3-RFI-SW-C-4302-00
KAIG3-RFI-SW-C-4301 00 KAIG3-RFI-SW-C-4301-00
KAIG3-RFI-SW-C-4300 00 KAIG3-RFI-SW-C-4300-00
KAIG3-RFI-SW-C-4294 00 KAIG3-RFI-SW-C-4294-00
KAIG3-RFI-SW-C-4293 00 KAIG3-RFI-SW-C-4293-00
KAIG3-RFI-SW-C-4291 00 KAIG3-RFI-SW-C-4291-00
KAIG3-RFI-SW-C-4290 00 KAIG3-RFI-SW-C-4290-00
KAIG3-RFI-SW-C-4289 00 KAIG3-RFI-SW-C-4289-00
KAIG3-RFI-SW-C-4283 00 KAIG3-RFI-SW-C-4283-00
KAIG3-RFI-SW-C-4282 00 KAIG3-RFI-SW-C-4282-00
KAIG3-RFI-SW-C-4278 00 KAIG3-RFI-SW-C-4278-00
KAIG3-RFI-SW-LC-0513 00 KAIG3-RFI-SW-LC-0513-00
KAIG3-RFI-SW-LC-0512 00 KAIG3-RFI-SW-LC-0512-00
KAIG3-RFI-SG-C-4309 00 KAIG3-RFI-SG-C-4309-00
KAIG3-RFI-WG-C-4308 00 KAIG3-RFI-WG-C-4308-00
KAIG3-RFI-ZG-C-4307 00 KAIG3-RFI-ZG-C-4307-00
KAIG3-RFI-ZG-C-4296 00 KAIG3-RFI-ZG-C-4296-00
KAIG3-RFI-PG-SU-2301 00 KAIG3-RFI-PG-SU-2301-00
KAIG3-RFI-PG-SU-2298 00 KAIG3-RFI-PG-SU-2298-00
KAIG3-RFI-WG-C-4288 00 KAIG3-RFI-WG-C-4288-00
KAIG3-RFI-AG-S-6756 00 KAIG3-RFI-AG-S-6756-00
KAIG3-RFI-PG-S-6323 01 KAIG3-RFI-PG-S-6323-01
KAIG3-RFI-PG-S-6755 00 KAIG3-RFI-PG-S-6755-00
KAIG3-RFI-PC-S-6745 00 KAIG3-RFI-PC-S-6745-00
KAIG3-RFI-PC-S-6746 00 KAIG3-RFI-PC-S-6746-00
KAIG3-RFI-PC-S-6747 00 KAIG3-RFI-PC-S-6747-00
KAIG3-RFI-TB-SS-0104 00 KAIG3-RFI-TB-SS-0104-00
KAIG3-RFI-GN-A-0713 01 KAIG3-RFI-GN-A-0713-01
KAIG3-RFI-SW-C-4279 00 KAIG3-RFI-SW-C-4279-00
KAIG3-RFI-SW-C-4281 00 KAIG3-RFI-SW-C-4281-00
KAIG3-RFI-SW-C-4280 00 KAIG3-RFI-SW-C-4280-00
KAIG3-RFI-SW-C-4277 00 KAIG3-RFI-SW-C-4277-00
KAIG3-RFI-SW-C-4276 00 KAIG3-RFI-SW-C-4276-00
KAIG3-RFI-SW-C-4275 00 KAIG3-RFI-SW-C-4275-00
KAIG3-RFI-SW-C-4273 00 KAIG3-RFI-SW-C-4273-00
KAIG3-RFI-SW-C-4272 00 KAIG3-RFI-SW-C-4272-00
KAIG3-RFI-SW-C-4271 00 KAIG3-RFI-SW-C-4271-00
KAIG3-RFI-SW-C-4270 00 KAIG3-RFI-SW-C-4270-00
KAIG3-RFI-SW-C-4269 00 KAIG3-RFI-SW-C-4269-00
KAIG3-RFI-SW-C-4268 00 KAIG3-RFI-SW-C-4268-00
KAIG3-RFI-SW-C-4267 00 KAIG3-RFI-SW-C-4267-00
KAIG3-RFI-SW-C-4266 00 KAIG3-RFI-SW-C-4266-00
KAIG3-RFI-SW-C-4265 00 KAIG3-RFI-SW-C-4265-00
KAIG3-RFI-SW-C-4264 00 KAIG3-RFI-SW-C-4264-00
KAIG3-RFI-WG-E-0416 00 KAIG3-RFI-WG-E-0416-00
KAIG3-RFI-SW-C-4263 00 KAIG3-RFI-SW-C-4263-00
KAIG3-RFI-SW-C-4254 00 KAIG3-RFI-SW-C-4254-00
KAIG3-RFI-PC-LC-0511 00 KAIG3-RFI-PC-LC-0511-00
KAIG3-RFI-TB-LC-0510 00 KAIG3-RFI-TB-LC-0510-00
KAIG3-RFI-TB-LC-0509 00 KAIG3-RFI-TB-LC-0509-00
KAIG3-RFI-PG-C-4285 00 KAIG3-RFI-PG-C-4285-00
KAIG3-RFI-PG-C-4284 00 KAIG3-RFI-PG-C-4284-00
KAIG3-RFI-TB-LC-0508 00 KAIG3-RFI-TB-LC-0508-00
KAIG3-RFI-WG-LS-1317 00 KAIG3-RFI-WG-LS-1317-00
KAIG3-RFI-AG-S-6748 00 KAIG3-RFI-AG-S-6748-00
KAIG3-RFI-ZG-C-4262 00 KAIG3-RFI-ZG-C-4262-00
KAIG3-RFI-SW-S-6750 00 KAIG3-RFI-SW-S-6750-00
KAIG3-RFI-SW-S-6749 00 KAIG3-RFI-SW-S-6749-00
KAIG3-RFI-PG-C-4261 00 KAIG3-RFI-PG-C-4261-00
KAIG3-RFI-PG-C-4260 00 KAIG3-RFI-PG-C-4260-00
KAIG3-RFI-SG-C-4259 00 KAIG3-RFI-SG-C-4259-00
KAIG3-RFI-SG-SU-2293 00 KAIG3-RFI-SG-SU-2293-00
KAIG3-RFI-SG-C-4258 00 KAIG3-RFI-SG-C-4258-00
KAIG3-RFI-SG-C-4257 00 KAIG3-RFI-SG-C-4257-00
KAIG3-RFI-WG-LS-1316 00 KAIG3-RFI-WG-LS-1316-00
KAIG3-RFI-WG-LS-1315 00 KAIG3-RFI-WG-LS-1315-00
KAIG3-RFI-SW-C-4208 00 KAIG3-RFI-SW-C-4208-00
KAIG3-RFI-SW-C-4232 00 KAIG3-RFI-SW-C-4232-00
KAIG3-RFI-SW-C-4231 00 KAIG3-RFI-SW-C-4231-00
KAIG3-RFI-SW-C-4253 00 KAIG3-RFI-SW-C-4253-00
KAIG3-RFI-SW-C-4252 00 KAIG3-RFI-SW-C-4252-00
KAIG3-RFI-SW-C-4251 00 KAIG3-RFI-SW-C-4251-00
KAIG3-RFI-SW-C-4250 00 KAIG3-RFI-SW-C-4250-00
KAIG3-RFI-SW-C-4249 00 KAIG3-RFI-SW-C-4249-00
KAIG3-RFI-SW-C-4242 00 KAIG3-RFI-SW-C-4242-00
KAIG3-RFI-SW-C-4241 00 KAIG3-RFI-SW-C-4241-00
KAIG3-RFI-SW-C-4240 00 KAIG3-RFI-SW-C-4240-00
KAIG3-RFI-SW-C-4239 00 KAIG3-RFI-SW-C-4239-00
KAIG3-RFI-AG-SS-0103 00 KAIG3-RFI-AG-SS-0103-00
KAIG3-RFI-TG-S-6742 00 KAIG3-RFI-TG-S-6742-00
KAIG3-RFI-TB-S-6741 00 KAIG3-RFI-TB-S-6741-00
KAIG3-RFI-TB-SU-2290 00 KAIG3-RFI-TB-SU-2290-00
KAIG3-RFI-PG-C-4243 00 KAIG3-RFI-PG-C-4243-00
KAIG3-RFI-TG-C-4238 00 KAIG3-RFI-TG-C-4238-00
KAIG3-RFI-CO-C-4244 00 KAIG3-RFI-CO-C-4244-00
KAIG3-RFI-CO-SU-2289 00 KAIG3-RFI-CO-SU-2289-00
KAIG3-RFI-CO-SU-2291 00 KAIG3-RFI-CO-SU-2291-00
KAIG3-RFI-CO-SU-2288 00 KAIG3-RFI-CO-SU-2288-00
KAIG3-RFI-CO-S-6735 00 KAIG3-RFI-CO-S-6735-00
KAIG3-RFI-CO-S-6736 00 KAIG3-RFI-CO-S-6736-00
KAIG3-RFI-CO-S-6739 00 KAIG3-RFI-CO-S-6739-00
KAIG3-RFI-CO-S-6738 00 KAIG3-RFI-CO-S-6738-00
KAIG3-RFI-CO-S-6737 00 KAIG3-RFI-CO-S-6737-00
KAIG3-RFI-CC-SU-2246 01 KAIG3-RFI-CC-SU-2246-01
KAIG3-RFI-MC-C-4233 00 KAIG3-RFI-MC-C-4233-00
KAIG3-RFI-CO-SU-2286 00 KAIG3-RFI-CO-SU-2286-00
KAIG3-RFI-MC-SU-2287 00 KAIG3-RFI-MC-SU-2287-00
KAIG3-RFI-SW-C-4210 00 KAIG3-RFI-SW-C-4210-00
KAIG3-RFI-TB-E-0415 00 KAIG3-RFI-TB-E-0415-00
KAIG3-RFI-WG-LS-1314 00 KAIG3-RFI-WG-LS-1314-00
KAIG3-RFI-TB-E-0414 00 KAIG3-RFI-TB-E-0414-00
KAIG3-RFI-WG-LS-1313 00 KAIG3-RFI-WG-LS-1313-00
KAIG3-RFI-WG-LS-1312 00 KAIG3-RFI-WG-LS-1312-00
KAIG3-RFI-WG-C-4230 00 KAIG3-RFI-WG-C-4230-00
KAIG3-RFI-WG-C-4229 00 KAIG3-RFI-WG-C-4229-00
KAIG3-RFI-PG-C-4228 00 KAIG3-RFI-PG-C-4228-00
KAIG3-RFI-PG-C-4227 00 KAIG3-RFI-PG-C-4227-00
KAIG3-RFI-PG-C-4226 00 KAIG3-RFI-PG-C-4226-00
KAIG3-RFI-TB-E-0413 00 KAIG3-RFI-TB-E-0413-00
KAIG3-RFI-CC-S-6662 00 KAIG3-RFI-CC-S-6662-00
KAIG3-RFI-MC-S-6613 01 KAIG3-RFI-MC-S-6613-01
KAIG3-RFI-MC-S-6615 01 KAIG3-RFI-MC-S-6615-01
KAIG3-RFI-MC-S-6728 00 KAIG3-RFI-MC-S-6728-00
KAIG3-RFI-SW-C-4237 00 KAIG3-RFI-SW-C-4237-00
KAIG3-RFI-MC-S-6729 00 KAIG3-RFI-MC-S-6729-00
KAIG3-RFI-SW-C-4236 00 KAIG3-RFI-SW-C-4236-00
KAIG3-RFI-LM-S-6731 00 KAIG3-RFI-LM-S-6731-00
KAIG3-RFI-SW-C-4235 00 KAIG3-RFI-SW-C-4235-00
KAIG3-RFI-SW-C-4234 00 KAIG3-RFI-SW-C-4234-00
KAIG3-RFI-SW-C-4225 00 KAIG3-RFI-SW-C-4225-00
KAIG3-RFI-MC-S-6730 00 KAIG3-RFI-MC-S-6730-00
KAIG3-RFI-SW-C-4224 00 KAIG3-RFI-SW-C-4224-00
KAIG3-RFI-SW-C-4223 00 KAIG3-RFI-SW-C-4223-00
KAIG3-RFI-LM-S-6732 00 KAIG3-RFI-LM-S-6732-00
KAIG3-RFI-SW-C-4222 00 KAIG3-RFI-SW-C-4222-00
KAIG3-RFI-SW-C-4221 00 KAIG3-RFI-SW-C-4221-00
KAIG3-RFI-SW-C-4220 00 KAIG3-RFI-SW-C-4220-00
KAIG3-RFI-LM-S-6733 00 KAIG3-RFI-LM-S-6733-00
KAIG3-RFI-SW-C-4219 00 KAIG3-RFI-SW-C-4219-00
KAIG3-RFI-SW-C-4218 00 KAIG3-RFI-SW-C-4218-00
KAIG3-RFI-SW-C-4217 00 KAIG3-RFI-SW-C-4217-00
KAIG3-RFI-LM-S-6734 00 KAIG3-RFI-LM-S-6734-00
KAIG3-RFI-SW-C-4216 00 KAIG3-RFI-SW-C-4216-00
KAIG3-RFI-SW-C-4215 00 KAIG3-RFI-SW-C-4215-00
KAIG3-RFI-SW-C-4214 00 KAIG3-RFI-SW-C-4214-00
KAIG3-RFI-SW-C-4213 00 KAIG3-RFI-SW-C-4213-00
KAIG3-RFI-SW-C-4212 00 KAIG3-RFI-SW-C-4212-00
KAIG3-RFI-SW-C-4190 00 KAIG3-RFI-SW-C-4190-00
KAIG3-RFI-SW-C-4189 00 KAIG3-RFI-SW-C-4189-00
KAIG3-RFI-SW-C-4161 00 KAIG3-RFI-SW-C-4161-00
KAIG3-RFI-SW-C-3872 01 KAIG3-RFI-SW-C-3872-01
KAIG3-RFI-SW-C-3860 01 KAIG3-RFI-SW-C-3860-01
KAIG3-RFI-MC-S-6713 00 KAIG3-RFI-MC-S-6713-00
KAIG3-RFI-SW-LC-0504 00 KAIG3-RFI-SW-LC-0504-00
KAIG3-RFI-SW-LC-0503 00 KAIG3-RFI-SW-LC-0503-00
KAIG3-RFI-SW-C-4204 00 KAIG3-RFI-SW-C-4204-00
KAIG3-RFI-SW-C-4197 00 KAIG3-RFI-SW-C-4197-00
KAIG3-RFI-SW-C-4196 00 KAIG3-RFI-SW-C-4196-00
KAIG3-RFI-SW-C-4195 00 KAIG3-RFI-SW-C-4195-00
KAIG3-RFI-SW-C-4188 00 KAIG3-RFI-SW-C-4188-00
KAIG3-RFI-SW-C-4187 00 KAIG3-RFI-SW-C-4187-00
KAIG3-RFI-SW-C-4186 00 KAIG3-RFI-SW-C-4186-00
KAIG3-RFI-SW-C-4185 00 KAIG3-RFI-SW-C-4185-00
KAIG3-RFI-SW-C-4184 00 KAIG3-RFI-SW-C-4184-00
KAIG3-RFI-SW-C-4183 00 KAIG3-RFI-SW-C-4183-00
KAIG3-RFI-SW-C-4182 00 KAIG3-RFI-SW-C-4182-00
KAIG3-RFI-SW-C-4181 00 KAIG3-RFI-SW-C-4181-00
KAIG3-RFI-SW-C-4180 00 KAIG3-RFI-SW-C-4180-00
KAIG3-RFI-SW-C-4179 00 KAIG3-RFI-SW-C-4179-00
KAIG3-RFI-SW-C-4088 01 KAIG3-RFI-SW-C-4088-01
KAIG3-RFI-SW-C-3415 01 KAIG3-RFI-SW-C-3415-01
KAIG3-RFI-SW-C-3413 01 KAIG3-RFI-SW-C-3413-01
KAIG3-RFI-SW-C-4206 00 KAIG3-RFI-SW-C-4206-00
KAIG3-RFI-SW-A-0765 00 KAIG3-RFI-SW-A-0765-00
KAIG3-RFI-CO-SS-0101 00 KAIG3-RFI-CO-SS-0101-00
KAIG3-RFI-CO-SS-0100 00 KAIG3-RFI-CO-SS-0100-00
KAIG3-RFI-SW-A-0764 00 KAIG3-RFI-SW-A-0764-00
KAIG3-RFI-CF-C-4202 00 KAIG3-RFI-CF-C-4202-00
KAIG3-RFI-LM-C-4205 00 KAIG3-RFI-LM-C-4205-00
KAIG3-RFI-SW-A-0763 00 KAIG3-RFI-SW-A-0763-00
KAIG3-RFI-CF-C-4201 00 KAIG3-RFI-CF-C-4201-00
KAIG3-RFI-CF-C-4203 00 KAIG3-RFI-CF-C-4203-00
KAIG3-RFI-AG-S-6722 00 KAIG3-RFI-AG-S-6722-00
KAIG3-RFI-MC-C-4200 00 KAIG3-RFI-MC-C-4200-00
KAIG3-RFI-AG-SS-0071 01 KAIG3-RFI-AG-SS-0071-01
KAIG3-RFI-SW-A-0762 00 KAIG3-RFI-SW-A-0762-00
KAIG3-RFI-AG-SS-0064 01 KAIG3-RFI-AG-SS-0064-01
KAIG3-RFI-WG-C-4199 00 KAIG3-RFI-WG-C-4199-00
KAIG3-RFI-CO-SU-2283 00 KAIG3-RFI-CO-SU-2283-00
KAIG3-RFI-CO-SU-2284 00 KAIG3-RFI-CO-SU-2284-00
KAIG3-RFI-CC-SU-2285 00 KAIG3-RFI-CC-SU-2285-00
KAIG3-RFI-CO-S-6718 00 KAIG3-RFI-CO-S-6718-00
KAIG3-RFI-CO-S-6719 00 KAIG3-RFI-CO-S-6719-00
KAIG3-RFI-CC-S-6723 00 KAIG3-RFI-CC-S-6723-00
KAIG3-RFI-CC-S-6724 00 KAIG3-RFI-CC-S-6724-00
KAIG3-RFI-CO-S-6721 00 KAIG3-RFI-CO-S-6721-00
KAIG3-RFI-CO-S-6617 00 KAIG3-RFI-CO-S-6617-00
KAIG3-RFI-CO-S-6716 00 KAIG3-RFI-CO-S-6716-00
KAIG3-RFI-CO-S-6717 00 KAIG3-RFI-CO-S-6717-00
KAIG3-RFI-LM-S-6709 00 KAIG3-RFI-LM-S-6709-00
KAIG3-RFI-LM-S-6708 00 KAIG3-RFI-LM-S-6708-00
KAIG3-RFI-CC-S-6621 00 KAIG3-RFI-CC-S-6621-00
KAIG3-RFI-MC-C-3880 00 KAIG3-RFI-MC-C-3880-00
KAIG3-RFI-PG-LC-0500 00 KAIG3-RFI-PG-LC-0500-00
KAIG3-RFI-PG-LC-0499 00 KAIG3-RFI-PG-LC-0499-00
KAIG3-RFI-PC-LC-0502 00 KAIG3-RFI-PC-LC-0502-00
KAIG3-RFI-PC-LC-0501 00 KAIG3-RFI-PC-LC-0501-00
KAIG3-RFI-MB-C-4194 00 KAIG3-RFI-MB-C-4194-00
KAIG3-RFI-PG-S-6715 00 KAIG3-RFI-PG-S-6715-00
KAIG3-RFI-WG-C-4172 00 KAIG3-RFI-WG-C-4172-00
KAIG3-RFI-MC-C-4193 00 KAIG3-RFI-MC-C-4193-00
KAIG3-RFI-CF-C-4191 00 KAIG3-RFI-CF-C-4191-00
KAIG3-RFI-CF-C-4192 00 KAIG3-RFI-CF-C-4192-00
KAIG3-RFI-CO-S-6714 00 KAIG3-RFI-CO-S-6714-00
KAIG3-RFI-WG-P-0206 00 KAIG3-RFI-WG-P-0206-00
KAIG3-RFI-CO-SS-0099 00 KAIG3-RFI-CO-SS-0099-00
KAIG3-RFI-TG-SS-0097 00 KAIG3-RFI-TG-SS-0097-00
KAIG3-RFI-SW-C-4173 00 KAIG3-RFI-SW-C-4173-00
KAIG3-RFI-TG-S-6702 00 KAIG3-RFI-TG-S-6702-00
KAIG3-RFI-WG-LS-1306 00 KAIG3-RFI-WG-LS-1306-00
KAIG3-RFI-WG-LS-1305 00 KAIG3-RFI-WG-LS-1305-00
KAIG3-RFI-SW-LS-1311 00 KAIG3-RFI-SW-LS-1311-00
KAIG3-RFI-SW-LS-1310 00 KAIG3-RFI-SW-LS-1310-00
KAIG3-RFI-WG-LS-1304 00 KAIG3-RFI-WG-LS-1304-00
KAIG3-RFI-WG-LS-1303 00 KAIG3-RFI-WG-LS-1303-00
KAIG3-RFI-SW-C-4169 00 KAIG3-RFI-SW-C-4169-00
KAIG3-RFI-SW-C-4168 00 KAIG3-RFI-SW-C-4168-00
KAIG3-RFI-SW-C-4167 00 KAIG3-RFI-SW-C-4167-00
KAIG3-RFI-SG-C-4171 00 KAIG3-RFI-SG-C-4171-00
KAIG3-RFI-CF-C-4178 00 KAIG3-RFI-CF-C-4178-00
KAIG3-RFI-SW-C-4166 00 KAIG3-RFI-SW-C-4166-00
KAIG3-RFI-CO-C-4151 00 KAIG3-RFI-CO-C-4151-00
KAIG3-RFI-SG-C-4170 00 KAIG3-RFI-SG-C-4170-00
KAIG3-RFI-SW-C-4165 00 KAIG3-RFI-SW-C-4165-00
KAIG3-RFI-SW-C-4164 00 KAIG3-RFI-SW-C-4164-00
KAIG3-RFI-CO-C-4175 00 KAIG3-RFI-CO-C-4175-00
KAIG3-RFI-SW-C-4163 00 KAIG3-RFI-SW-C-4163-00
KAIG3-RFI-SW-C-4162 00 KAIG3-RFI-SW-C-4162-00
KAIG3-RFI-CO-SS-0098 00 KAIG3-RFI-CO-SS-0098-00
KAIG3-RFI-CO-SU-2281 00 KAIG3-RFI-CO-SU-2281-00
KAIG3-RFI-CO-SU-2282 00 KAIG3-RFI-CO-SU-2282-00
KAIG3-RFI-SW-C-4160 00 KAIG3-RFI-SW-C-4160-00
KAIG3-RFI-SW-C-4159 00 KAIG3-RFI-SW-C-4159-00
KAIG3-RFI-SW-C-4158 00 KAIG3-RFI-SW-C-4158-00
KAIG3-RFI-CO-S-6706 00 KAIG3-RFI-CO-S-6706-00
KAIG3-RFI-SW-C-4157 00 KAIG3-RFI-SW-C-4157-00
KAIG3-RFI-CO-S-6710 00 KAIG3-RFI-CO-S-6710-00
KAIG3-RFI-MC-S-6712 00 KAIG3-RFI-MC-S-6712-00
KAIG3-RFI-CO-S-6663 00 KAIG3-RFI-CO-S-6663-00
KAIG3-RFI-CO-S-6705 00 KAIG3-RFI-CO-S-6705-00
KAIG3-RFI-SW-LC-0480 01 KAIG3-RFI-SW-LC-0480-01
KAIG3-RFI-SW-LC-0479 01 KAIG3-RFI-SW-LC-0479-01
KAIG3-RFI-PC-LC-0498 00 KAIG3-RFI-PC-LC-0498-00
KAIG3-RFI-TG-C-4129 00 KAIG3-RFI-TG-C-4129-00
KAIG3-RFI-TB-S-6698 00 KAIG3-RFI-TB-S-6698-00
KAIG3-RFI-WG-C-4128 00 KAIG3-RFI-WG-C-4128-00
KAIG3-RFI-AG-SS-0096 00 KAIG3-RFI-AG-SS-0096-00
KAIG3-RFI-TG-S-6492 01 KAIG3-RFI-TG-S-6492-01
KAIG3-RFI-PG-SU-2280 00 KAIG3-RFI-PG-SU-2280-00
KAIG3-RFI-SW-LS-1309 00 KAIG3-RFI-SW-LS-1309-00
KAIG3-RFI-SW-LS-1308 00 KAIG3-RFI-SW-LS-1308-00
KAIG3-RFI-SW-LS-1307 00 KAIG3-RFI-SW-LS-1307-00
KAIG3-RFI-PG-C-4127 00 KAIG3-RFI-PG-C-4127-00
KAIG3-RFI-SW-LS-1302 00 KAIG3-RFI-SW-LS-1302-00
KAIG3-RFI-TG-SU-2278 00 KAIG3-RFI-TG-SU-2278-00
KAIG3-RFI-SW-LS-1301 00 KAIG3-RFI-SW-LS-1301-00
KAIG3-RFI-SW-LS-1300 00 KAIG3-RFI-SW-LS-1300-00
KAIG3-RFI-SW-LS-1299 00 KAIG3-RFI-SW-LS-1299-00
KAIG3-RFI-SW-LS-1298 00 KAIG3-RFI-SW-LS-1298-00
KAIG3-RFI-SW-LS-1297 00 KAIG3-RFI-SW-LS-1297-00
KAIG3-RFI-SW-LS-1296 00 KAIG3-RFI-SW-LS-1296-00
KAIG3-RFI-SW-LS-1295 00 KAIG3-RFI-SW-LS-1295-00
KAIG3-RFI-SW-LS-1292 00 KAIG3-RFI-SW-LS-1292-00
KAIG3-RFI-SW-LS-1291 00 KAIG3-RFI-SW-LS-1291-00
KAIG3-RFI-SW-LS-1290 00 KAIG3-RFI-SW-LS-1290-00
KAIG3-RFI-SW-LS-1289 00 KAIG3-RFI-SW-LS-1289-00
KAIG3-RFI-SW-C-4156 00 KAIG3-RFI-SW-C-4156-00
KAIG3-RFI-SW-C-4155 00 KAIG3-RFI-SW-C-4155-00
KAIG3-RFI-SW-C-4150 00 KAIG3-RFI-SW-C-4150-00
KAIG3-RFI-SW-C-4149 00 KAIG3-RFI-SW-C-4149-00
KAIG3-RFI-SW-C-4148 00 KAIG3-RFI-SW-C-4148-00
KAIG3-RFI-SW-C-4147 00 KAIG3-RFI-SW-C-4147-00
KAIG3-RFI-SW-C-4146 00 KAIG3-RFI-SW-C-4146-00
KAIG3-RFI-SW-C-4145 00 KAIG3-RFI-SW-C-4145-00
KAIG3-RFI-SW-C-4144 00 KAIG3-RFI-SW-C-4144-00
KAIG3-RFI-SW-C-4140 00 KAIG3-RFI-SW-C-4140-00
KAIG3-RFI-SW-C-4136 00 KAIG3-RFI-SW-C-4136-00
KAIG3-RFI-SW-C-4135 00 KAIG3-RFI-SW-C-4135-00
KAIG3-RFI-LM-C-4152 00 KAIG3-RFI-LM-C-4152-00
KAIG3-RFI-CO-C-4154 00 KAIG3-RFI-CO-C-4154-00
KAIG3-RFI-MC-SU-2279 00 KAIG3-RFI-MC-SU-2279-00
KAIG3-RFI-CO-S-6531 01 KAIG3-RFI-CO-S-6531-01
KAIG3-RFI-CO-S-6638 00 KAIG3-RFI-CO-S-6638-00
KAIG3-RFI-CO-S-6640 00 KAIG3-RFI-CO-S-6640-00
KAIG3-RFI-MC-S-6699 00 KAIG3-RFI-MC-S-6699-00
KAIG3-RFI-MC-S-6700 00 KAIG3-RFI-MC-S-6700-00
KAIG3-RFI-MC-S-6701 00 KAIG3-RFI-MC-S-6701-00
KAIG3-RFI-TB-S-6696 00 KAIG3-RFI-TB-S-6696-00
KAIG3-RFI-TB-SU-2277 00 KAIG3-RFI-TB-SU-2277-00
KAIG3-RFI-SW-S-6690 00 KAIG3-RFI-SW-S-6690-00
KAIG3-RFI-SW-SU-2276 00 KAIG3-RFI-SW-SU-2276-00
KAIG3-RFI-SG-LS-1258 00 KAIG3-RFI-SG-LS-1258-00
KAIG3-RFI-PG-LS-1257 00 KAIG3-RFI-PG-LS-1257-00
KAIG3-RFI-PG-LS-1256 00 KAIG3-RFI-PG-LS-1256-00
KAIG3-RFI-PG-LS-1250 00 KAIG3-RFI-PG-LS-1250-00
KAIG3-RFI-TG-C-4096 00 KAIG3-RFI-TG-C-4096-00
KAIG3-RFI-SW-S-6689 00 KAIG3-RFI-SW-S-6689-00
KAIG3-RFI-TG-S-6687 00 KAIG3-RFI-TG-S-6687-00
KAIG3-RFI-TG-S-6686 00 KAIG3-RFI-TG-S-6686-00
KAIG3-RFI-TB-S-6685 00 KAIG3-RFI-TB-S-6685-00
KAIG3-RFI-TB-S-6684 00 KAIG3-RFI-TB-S-6684-00
KAIG3-RFI-SW-LS-1288 00 KAIG3-RFI-SW-LS-1288-00
KAIG3-RFI-SW-LS-1287 00 KAIG3-RFI-SW-LS-1287-00
KAIG3-RFI-SW-LS-1286 00 KAIG3-RFI-SW-LS-1286-00
KAIG3-RFI-SW-LS-1285 00 KAIG3-RFI-SW-LS-1285-00
KAIG3-RFI-SW-LS-1284 00 KAIG3-RFI-SW-LS-1284-00
KAIG3-RFI-SW-LS-1283 00 KAIG3-RFI-SW-LS-1283-00
KAIG3-RFI-SW-LS-1282 00 KAIG3-RFI-SW-LS-1282-00
KAIG3-RFI-SW-LS-1281 00 KAIG3-RFI-SW-LS-1281-00
KAIG3-RFI-SW-LS-1280 00 KAIG3-RFI-SW-LS-1280-00
KAIG3-RFI-SW-LS-1279 00 KAIG3-RFI-SW-LS-1279-00
KAIG3-RFI-SW-LS-1278 00 KAIG3-RFI-SW-LS-1278-00
KAIG3-RFI-SW-LS-1277 00 KAIG3-RFI-SW-LS-1277-00
KAIG3-RFI-SW-LS-1276 00 KAIG3-RFI-SW-LS-1276-00
KAIG3-RFI-SW-C-4143 00 KAIG3-RFI-SW-C-4143-00
KAIG3-RFI-SW-C-4139 00 KAIG3-RFI-SW-C-4139-00
KAIG3-RFI-SW-C-4138 00 KAIG3-RFI-SW-C-4138-00
KAIG3-RFI-SW-C-4137 00 KAIG3-RFI-SW-C-4137-00
KAIG3-RFI-SW-C-4134 00 KAIG3-RFI-SW-C-4134-00
KAIG3-RFI-SW-LC-0497 00 KAIG3-RFI-SW-LC-0497-00
KAIG3-RFI-SW-LC-0496 00 KAIG3-RFI-SW-LC-0496-00
KAIG3-RFI-SW-C-4133 00 KAIG3-RFI-SW-C-4133-00
KAIG3-RFI-SW-C-4132 00 KAIG3-RFI-SW-C-4132-00
KAIG3-RFI-SW-C-4125 00 KAIG3-RFI-SW-C-4125-00
KAIG3-RFI-SW-C-4124 00 KAIG3-RFI-SW-C-4124-00
KAIG3-RFI-PG-E-0412 00 KAIG3-RFI-PG-E-0412-00
KAIG3-RFI-SW-C-4123 00 KAIG3-RFI-SW-C-4123-00
KAIG3-RFI-SW-C-4122 00 KAIG3-RFI-SW-C-4122-00
KAIG3-RFI-SW-C-4121 00 KAIG3-RFI-SW-C-4121-00
KAIG3-RFI-SW-C-4120 00 KAIG3-RFI-SW-C-4120-00
KAIG3-RFI-SW-C-4119 00 KAIG3-RFI-SW-C-4119-00
KAIG3-RFI-SW-E-0405 00 KAIG3-RFI-SW-E-0405-00
KAIG3-RFI-SW-C-4141 00 KAIG3-RFI-SW-C-4141-00
KAIG3-RFI-SW-C-4142 00 KAIG3-RFI-SW-C-4142-00
KAIG3-RFI-SW-P-0205 00 KAIG3-RFI-SW-P-0205-00
KAIG3-RFI-CO-SS-0095 00 KAIG3-RFI-CO-SS-0095-00
KAIG3-RFI-CO-SS-0094 00 KAIG3-RFI-CO-SS-0094-00
KAIG3-RFI-CO-C-4130 00 KAIG3-RFI-CO-C-4130-00
KAIG3-RFI-LM-C-4126 00 KAIG3-RFI-LM-C-4126-00
KAIG3-RFI-MC-C-4131 00 KAIG3-RFI-MC-C-4131-00
KAIG3-RFI-PC-S-6691 00 KAIG3-RFI-PC-S-6691-00
KAIG3-RFI-PC-S-6692 00 KAIG3-RFI-PC-S-6692-00
KAIG3-RFI-PC-S-6693 00 KAIG3-RFI-PC-S-6693-00
KAIG3-RFI-PC-S-6694 00 KAIG3-RFI-PC-S-6694-00
KAIG3-RFI-MB-LC-0495 00 KAIG3-RFI-MB-LC-0495-00
KAIG3-RFI-MB-LC-0494 00 KAIG3-RFI-MB-LC-0494-00
KAIG3-RFI-TB-E-0411 00 KAIG3-RFI-TB-E-0411-00
KAIG3-RFI-TB-E-0410 00 KAIG3-RFI-TB-E-0410-00
KAIG3-RFI-SW-LS-1275 00 KAIG3-RFI-SW-LS-1275-00
KAIG3-RFI-SW-LS-1274 00 KAIG3-RFI-SW-LS-1274-00
KAIG3-RFI-SW-LS-1273 00 KAIG3-RFI-SW-LS-1273-00
KAIG3-RFI-SW-LS-1272 00 KAIG3-RFI-SW-LS-1272-00
KAIG3-RFI-SW-LS-1271 00 KAIG3-RFI-SW-LS-1271-00
KAIG3-RFI-SW-P-0204 00 KAIG3-RFI-SW-P-0204-00
KAIG3-RFI-SW-LS-1270 00 KAIG3-RFI-SW-LS-1270-00
KAIG3-RFI-SW-LS-1269 00 KAIG3-RFI-SW-LS-1269-00
KAIG3-RFI-SW-LS-1268 00 KAIG3-RFI-SW-LS-1268-00
KAIG3-RFI-SW-P-0203 00 KAIG3-RFI-SW-P-0203-00
KAIG3-RFI-SW-LS-1267 00 KAIG3-RFI-SW-LS-1267-00
KAIG3-RFI-SW-LS-1266 00 KAIG3-RFI-SW-LS-1266-00
KAIG3-RFI-SW-LS-1265 00 KAIG3-RFI-SW-LS-1265-00
KAIG3-RFI-SW-C-4114 00 KAIG3-RFI-SW-C-4114-00
KAIG3-RFI-SW-LS-1264 00 KAIG3-RFI-SW-LS-1264-00
KAIG3-RFI-SW-LS-1263 00 KAIG3-RFI-SW-LS-1263-00
KAIG3-RFI-SW-C-4117 00 KAIG3-RFI-SW-C-4117-00
KAIG3-RFI-SW-C-4116 00 KAIG3-RFI-SW-C-4116-00
KAIG3-RFI-SW-C-4113 00 KAIG3-RFI-SW-C-4113-00
KAIG3-RFI-SW-C-4112 00 KAIG3-RFI-SW-C-4112-00
KAIG3-RFI-SW-C-4111 00 KAIG3-RFI-SW-C-4111-00
KAIG3-RFI-SW-C-4105 00 KAIG3-RFI-SW-C-4105-00
KAIG3-RFI-TG-S-6683 00 KAIG3-RFI-TG-S-6683-00
KAIG3-RFI-PT-A-0761 00 KAIG3-RFI-PT-A-0761-00
KAIG3-RFI-PT-A-0183 02 KAIG3-RFI-PT-A-0183-02
KAIG3-RFI-SG-C-4095 00 KAIG3-RFI-SG-C-4095-00
KAIG3-RFI-SG-C-4094 00 KAIG3-RFI-SG-C-4094-00
KAIG3-RFI-MB-C-4093 00 KAIG3-RFI-MB-C-4093-00
KAIG3-RFI-ZG-C-4092 00 KAIG3-RFI-ZG-C-4092-00
KAIG3-RFI-WG-C-4072 00 KAIG3-RFI-WG-C-4072-00
KAIG3-RFI-SW-C-4104 00 KAIG3-RFI-SW-C-4104-00
KAIG3-RFI-SW-C-4103 00 KAIG3-RFI-SW-C-4103-00
KAIG3-RFI-SW-C-4102 00 KAIG3-RFI-SW-C-4102-00
KAIG3-RFI-SW-C-4101 00 KAIG3-RFI-SW-C-4101-00
KAIG3-RFI-SW-C-4100 00 KAIG3-RFI-SW-C-4100-00
KAIG3-RFI-SW-C-4099 00 KAIG3-RFI-SW-C-4099-00
KAIG3-RFI-SW-C-4098 00 KAIG3-RFI-SW-C-4098-00
KAIG3-RFI-SW-C-4097 00 KAIG3-RFI-SW-C-4097-00
KAIG3-RFI-SW-C-3705 01 KAIG3-RFI-SW-C-3705-01
KAIG3-RFI-TG-SS-0090 00 KAIG3-RFI-TG-SS-0090-00
KAIG3-RFI-AG-SS-0087 00 KAIG3-RFI-AG-SS-0087-00
KAIG3-RFI-CO-SU-2274 00 KAIG3-RFI-CO-SU-2274-00
KAIG3-RFI-CO-SU-2275 00 KAIG3-RFI-CO-SU-2275-00
KAIG3-RFI-CO-SU-2272 00 KAIG3-RFI-CO-SU-2272-00
KAIG3-RFI-CO-SU-2273 00 KAIG3-RFI-CO-SU-2273-00
KAIG3-RFI-CO-SS-0093 00 KAIG3-RFI-CO-SS-0093-00
KAIG3-RFI-CO-S-6679 00 KAIG3-RFI-CO-S-6679-00
KAIG3-RFI-CO-S-6680 00 KAIG3-RFI-CO-S-6680-00
KAIG3-RFI-CO-S-6681 00 KAIG3-RFI-CO-S-6681-00
KAIG3-RFI-CO-S-6682 00 KAIG3-RFI-CO-S-6682-00
KAIG3-RFI-CO-S-6670 00 KAIG3-RFI-CO-S-6670-00
KAIG3-RFI-CO-S-6676 00 KAIG3-RFI-CO-S-6676-00
KAIG3-RFI-CO-S-6677 00 KAIG3-RFI-CO-S-6677-00
KAIG3-RFI-LM-C-4118 00 KAIG3-RFI-LM-C-4118-00
KAIG3-RFI-CO-C-4106 00 KAIG3-RFI-CO-C-4106-00
KAIG3-RFI-CO-C-4107 00 KAIG3-RFI-CO-C-4107-00
KAIG3-RFI-CO-C-4108 00 KAIG3-RFI-CO-C-4108-00
KAIG3-RFI-CO-C-4109 00 KAIG3-RFI-CO-C-4109-00
KAIG3-RFI-CO-C-4110 00 KAIG3-RFI-CO-C-4110-00
KAIG3-RFI-CO-S-6673 00 KAIG3-RFI-CO-S-6673-00
KAIG3-RFI-CO-S-6672 00 KAIG3-RFI-CO-S-6672-00
KAIG3-RFI-CO-S-6674 00 KAIG3-RFI-CO-S-6674-00
KAIG3-RFI-PC-LC-0493 00 KAIG3-RFI-PC-LC-0493-00
KAIG3-RFI-SW-LC-0492 00 KAIG3-RFI-SW-LC-0492-00
KAIG3-RFI-SW-LC-0491 00 KAIG3-RFI-SW-LC-0491-00
KAIG3-RFI-SW-LS-1262 00 KAIG3-RFI-SW-LS-1262-00
KAIG3-RFI-SW-C-4090 00 KAIG3-RFI-SW-C-4090-00
KAIG3-RFI-SW-C-4089 00 KAIG3-RFI-SW-C-4089-00
KAIG3-RFI-SW-C-4088 00 KAIG3-RFI-SW-C-4088-00
KAIG3-RFI-SW-C-4087 00 KAIG3-RFI-SW-C-4087-00
KAIG3-RFI-SW-C-4086 00 KAIG3-RFI-SW-C-4086-00
KAIG3-RFI-SW-C-4085 00 KAIG3-RFI-SW-C-4085-00
KAIG3-RFI-SW-C-4075 00 KAIG3-RFI-SW-C-4075-00
KAIG3-RFI-SW-C-4070 00 KAIG3-RFI-SW-C-4070-00
KAIG3-RFI-SW-C-4069 00 KAIG3-RFI-SW-C-4069-00
KAIG3-RFI-SW-C-4068 00 KAIG3-RFI-SW-C-4068-00
KAIG3-RFI-SW-C-4067 00 KAIG3-RFI-SW-C-4067-00
KAIG3-RFI-SW-C-4066 00 KAIG3-RFI-SW-C-4066-00
KAIG3-RFI-SW-C-4065 00 KAIG3-RFI-SW-C-4065-00
KAIG3-RFI-SW-C-4064 00 KAIG3-RFI-SW-C-4064-00
KAIG3-RFI-SW-C-4063 00 KAIG3-RFI-SW-C-4063-00
KAIG3-RFI-SW-C-4062 00 KAIG3-RFI-SW-C-4062-00
KAIG3-RFI-SW-C-3623 01 KAIG3-RFI-SW-C-3623-01
KAIG3-RFI-SW-E-0409 00 KAIG3-RFI-SW-E-0409-00
KAIG3-RFI-TB-S-6669 00 KAIG3-RFI-TB-S-6669-00
KAIG3-RFI-TB-SU-2271 00 KAIG3-RFI-TB-SU-2271-00
KAIG3-RFI-WG-C-4071 00 KAIG3-RFI-WG-C-4071-00
KAIG3-RFI-TT-A-0760 00 KAIG3-RFI-TT-A-0760-00
KAIG3-RFI-CO-C-4083 00 KAIG3-RFI-CO-C-4083-00
KAIG3-RFI-MC-C-4079 00 KAIG3-RFI-MC-C-4079-00
KAIG3-RFI-CO-C-4055 00 KAIG3-RFI-CO-C-4055-00
KAIG3-RFI-CO-C-4080 00 KAIG3-RFI-CO-C-4080-00
KAIG3-RFI-CO-C-4081 00 KAIG3-RFI-CO-C-4081-00
KAIG3-RFI-CO-C-4082 00 KAIG3-RFI-CO-C-4082-00
KAIG3-RFI-CO-C-4084 00 KAIG3-RFI-CO-C-4084-00
KAIG3-RFI-CO-C-4091 00 KAIG3-RFI-CO-C-4091-00
KAIG3-RFI-CO-SS-0092 00 KAIG3-RFI-CO-SS-0092-00
KAIG3-RFI-MC-S-6668 00 KAIG3-RFI-MC-S-6668-00
KAIG3-RFI-PC-E-0408 00 KAIG3-RFI-PC-E-0408-00
KAIG3-RFI-PC-E-0407 00 KAIG3-RFI-PC-E-0407-00
KAIG3-RFI-PC-E-0406 00 KAIG3-RFI-PC-E-0406-00
KAIG3-RFI-PC-LC-0490 00 KAIG3-RFI-PC-LC-0490-00
KAIG3-RFI-PC-LC-0489 00 KAIG3-RFI-PC-LC-0489-00
KAIG3-RFI-ZG-P-0202 00 KAIG3-RFI-ZG-P-0202-00
KAIG3-RFI-SG-C-4056 00 KAIG3-RFI-SG-C-4056-00
KAIG3-RFI-WG-LS-1261 00 KAIG3-RFI-WG-LS-1261-00
KAIG3-RFI-WG-LS-1260 00 KAIG3-RFI-WG-LS-1260-00
KAIG3-RFI-WG-LS-1259 00 KAIG3-RFI-WG-LS-1259-00
KAIG3-RFI-PG-C-3694 01 KAIG3-RFI-PG-C-3694-01
KAIG3-RFI-PG-C-3693 01 KAIG3-RFI-PG-C-3693-01
KAIG3-RFI-ZG-SU-2269 00 KAIG3-RFI-ZG-SU-2269-00
KAIG3-RFI-ZG-S-6661 00 KAIG3-RFI-ZG-S-6661-00
KAIG3-RFI-ZG-S-6660 00 KAIG3-RFI-ZG-S-6660-00
KAIG3-RFI-SW-S-6654 00 KAIG3-RFI-SW-S-6654-00
KAIG3-RFI-PG-C-4039 00 KAIG3-RFI-PG-C-4039-00
KAIG3-RFI-SW-LS-1255 00 KAIG3-RFI-SW-LS-1255-00
KAIG3-RFI-SW-C-4061 00 KAIG3-RFI-SW-C-4061-00
KAIG3-RFI-SW-C-4060 00 KAIG3-RFI-SW-C-4060-00
KAIG3-RFI-SW-C-4059 00 KAIG3-RFI-SW-C-4059-00
KAIG3-RFI-SW-C-4058 00 KAIG3-RFI-SW-C-4058-00
KAIG3-RFI-SW-C-4057 00 KAIG3-RFI-SW-C-4057-00
KAIG3-RFI-SW-C-4046 00 KAIG3-RFI-SW-C-4046-00
KAIG3-RFI-SW-C-4045 00 KAIG3-RFI-SW-C-4045-00
KAIG3-RFI-SW-C-4044 00 KAIG3-RFI-SW-C-4044-00
KAIG3-RFI-SW-C-4043 00 KAIG3-RFI-SW-C-4043-00
KAIG3-RFI-SW-C-4042 00 KAIG3-RFI-SW-C-4042-00
KAIG3-RFI-SW-C-4041 00 KAIG3-RFI-SW-C-4041-00
KAIG3-RFI-SW-C-4040 00 KAIG3-RFI-SW-C-4040-00
KAIG3-RFI-SW-C-4035 00 KAIG3-RFI-SW-C-4035-00
KAIG3-RFI-SW-C-4034 00 KAIG3-RFI-SW-C-4034-00
KAIG3-RFI-MC-C-4050 00 KAIG3-RFI-MC-C-4050-00
KAIG3-RFI-SW-C-4029 00 KAIG3-RFI-SW-C-4029-00
KAIG3-RFI-SW-C-3192 01 KAIG3-RFI-SW-C-3192-01
KAIG3-RFI-CO-C-4048 00 KAIG3-RFI-CO-C-4048-00
KAIG3-RFI-SW-C-2617 01 KAIG3-RFI-SW-C-2617-01
KAIG3-RFI-SW-C-2164 01 KAIG3-RFI-SW-C-2164-01
KAIG3-RFI-SW-C-1989 01 KAIG3-RFI-SW-C-1989-01
KAIG3-RFI-SW-C-1893 01 KAIG3-RFI-SW-C-1893-01
KAIG3-RFI-MC-C-4051 00 KAIG3-RFI-MC-C-4051-00
KAIG3-RFI-CO-C-4049 00 KAIG3-RFI-CO-C-4049-00
KAIG3-RFI-MC-C-4053 00 KAIG3-RFI-MC-C-4053-00
KAIG3-RFI-CO-C-4054 00 KAIG3-RFI-CO-C-4054-00
KAIG3-RFI-CO-C-4052 00 KAIG3-RFI-CO-C-4052-00
KAIG3-RFI-LM-C-4036 00 KAIG3-RFI-LM-C-4036-00
KAIG3-RFI-LM-C-4037 00 KAIG3-RFI-LM-C-4037-00
KAIG3-RFI-LM-C-4038 00 KAIG3-RFI-LM-C-4038-00
KAIG3-RFI-LM-C-4022 00 KAIG3-RFI-LM-C-4022-00
KAIG3-RFI-MC-SU-2270 00 KAIG3-RFI-MC-SU-2270-00
KAIG3-RFI-MC-S-6666 00 KAIG3-RFI-MC-S-6666-00
KAIG3-RFI-MC-S-6667 00 KAIG3-RFI-MC-S-6667-00
KAIG3-RFI-CO-S-6620 00 KAIG3-RFI-CO-S-6620-00
KAIG3-RFI-MC-S-6594 00 KAIG3-RFI-MC-S-6594-00
KAIG3-RFI-MC-S-6469 00 KAIG3-RFI-MC-S-6469-00
KAIG3-RFI-PC-E-0403 00 KAIG3-RFI-PC-E-0403-00
KAIG3-RFI-PC-LC-0486 00 KAIG3-RFI-PC-LC-0486-00
KAIG3-RFI-SW-LS-1254 00 KAIG3-RFI-SW-LS-1254-00
KAIG3-RFI-SW-LS-1253 00 KAIG3-RFI-SW-LS-1253-00
KAIG3-RFI-SW-LS-1252 00 KAIG3-RFI-SW-LS-1252-00
KAIG3-RFI-CO-SS-0088 00 KAIG3-RFI-CO-SS-0088-00
KAIG3-RFI-CO-SS-0091 00 KAIG3-RFI-CO-SS-0091-00
KAIG3-RFI-SW-LS-1251 00 KAIG3-RFI-SW-LS-1251-00
KAIG3-RFI-SW-C-4033 00 KAIG3-RFI-SW-C-4033-00
KAIG3-RFI-SW-C-4028 00 KAIG3-RFI-SW-C-4028-00
KAIG3-RFI-SW-C-4027 00 KAIG3-RFI-SW-C-4027-00
KAIG3-RFI-SW-C-4026 00 KAIG3-RFI-SW-C-4026-00
KAIG3-RFI-SW-C-4025 00 KAIG3-RFI-SW-C-4025-00
KAIG3-RFI-SW-C-4024 00 KAIG3-RFI-SW-C-4024-00
KAIG3-RFI-CO-C-4017 00 KAIG3-RFI-CO-C-4017-00
KAIG3-RFI-SW-C-4023 00 KAIG3-RFI-SW-C-4023-00
KAIG3-RFI-CO-C-4021 00 KAIG3-RFI-CO-C-4021-00
KAIG3-RFI-CO-C-4018 00 KAIG3-RFI-CO-C-4018-00
KAIG3-RFI-SW-C-4015 00 KAIG3-RFI-SW-C-4015-00
KAIG3-RFI-MC-C-4019 00 KAIG3-RFI-MC-C-4019-00
KAIG3-RFI-SW-C-4014 00 KAIG3-RFI-SW-C-4014-00
KAIG3-RFI-CO-C-3972 00 KAIG3-RFI-CO-C-3972-00
KAIG3-RFI-SW-C-4013 00 KAIG3-RFI-SW-C-4013-00
KAIG3-RFI-CO-C-4016 00 KAIG3-RFI-CO-C-4016-00
KAIG3-RFI-SW-C-4012 00 KAIG3-RFI-SW-C-4012-00
KAIG3-RFI-SW-C-4011 00 KAIG3-RFI-SW-C-4011-00
KAIG3-RFI-SW-C-4010 00 KAIG3-RFI-SW-C-4010-00
KAIG3-RFI-SW-C-4009 00 KAIG3-RFI-SW-C-4009-00
KAIG3-RFI-CO-SU-2268 00 KAIG3-RFI-CO-SU-2268-00
KAIG3-RFI-SW-C-4008 00 KAIG3-RFI-SW-C-4008-00
KAIG3-RFI-CO-SU-2266 00 KAIG3-RFI-CO-SU-2266-00
KAIG3-RFI-CO-SU-2265 00 KAIG3-RFI-CO-SU-2265-00
KAIG3-RFI-SW-C-4007 00 KAIG3-RFI-SW-C-4007-00
KAIG3-RFI-CO-SU-2263 00 KAIG3-RFI-CO-SU-2263-00
KAIG3-RFI-SW-C-4006 00 KAIG3-RFI-SW-C-4006-00
KAIG3-RFI-CO-SU-2264 00 KAIG3-RFI-CO-SU-2264-00
KAIG3-RFI-SW-C-4005 00 KAIG3-RFI-SW-C-4005-00
KAIG3-RFI-SW-C-4004 00 KAIG3-RFI-SW-C-4004-00
KAIG3-RFI-CO-SU-2262 00 KAIG3-RFI-CO-SU-2262-00
KAIG3-RFI-CO-S-6657 00 KAIG3-RFI-CO-S-6657-00
KAIG3-RFI-CO-S-6658 00 KAIG3-RFI-CO-S-6658-00
KAIG3-RFI-SW-C-4003 00 KAIG3-RFI-SW-C-4003-00
KAIG3-RFI-MC-S-6655 00 KAIG3-RFI-MC-S-6655-00
KAIG3-RFI-SW-C-4002 00 KAIG3-RFI-SW-C-4002-00
KAIG3-RFI-SW-C-4000 00 KAIG3-RFI-SW-C-4000-00
KAIG3-RFI-CO-S-6651 00 KAIG3-RFI-CO-S-6651-00
KAIG3-RFI-SW-C-3999 00 KAIG3-RFI-SW-C-3999-00
KAIG3-RFI-CO-S-6652 00 KAIG3-RFI-CO-S-6652-00
KAIG3-RFI-CO-S-6656 00 KAIG3-RFI-CO-S-6656-00
KAIG3-RFI-SW-C-3998 00 KAIG3-RFI-SW-C-3998-00
KAIG3-RFI-LM-S-6650 00 KAIG3-RFI-LM-S-6650-00
KAIG3-RFI-SW-C-3997 00 KAIG3-RFI-SW-C-3997-00
KAIG3-RFI-CO-S-6648 00 KAIG3-RFI-CO-S-6648-00
KAIG3-RFI-SW-C-3996 00 KAIG3-RFI-SW-C-3996-00
KAIG3-RFI-CO-S-6647 00 KAIG3-RFI-CO-S-6647-00
KAIG3-RFI-SW-C-3995 00 KAIG3-RFI-SW-C-3995-00
KAIG3-RFI-SW-C-3994 00 KAIG3-RFI-SW-C-3994-00
KAIG3-RFI-SW-C-3983 00 KAIG3-RFI-SW-C-3983-00
KAIG3-RFI-SW-C-3259 01 KAIG3-RFI-SW-C-3259-01
KAIG3-RFI-SW-LC-0485 00 KAIG3-RFI-SW-LC-0485-00
KAIG3-RFI-SW-LC-0484 00 KAIG3-RFI-SW-LC-0484-00
KAIG3-RFI-TG-E-0404 00 KAIG3-RFI-TG-E-0404-00
KAIG3-RFI-TG-LC-0487 00 KAIG3-RFI-TG-LC-0487-00
KAIG3-RFI-TG-LC-0488 00 KAIG3-RFI-TG-LC-0488-00
KAIG3-RFI-CO-S-6643 00 KAIG3-RFI-CO-S-6643-00
KAIG3-RFI-CO-S-6644 00 KAIG3-RFI-CO-S-6644-00
KAIG3-RFI-CO-S-6645 00 KAIG3-RFI-CO-S-6645-00
KAIG3-RFI-CO-S-6646 00 KAIG3-RFI-CO-S-6646-00
KAIG3-RFI-CO-S-6642 00 KAIG3-RFI-CO-S-6642-00
KAIG3-RFI-CO-S-6641 00 KAIG3-RFI-CO-S-6641-00
KAIG3-RFI-AG-S-6653 00 KAIG3-RFI-AG-S-6653-00
KAIG3-RFI-SW-SU-2267 00 KAIG3-RFI-SW-SU-2267-00
KAIG3-RFI-SG-C-4030 00 KAIG3-RFI-SG-C-4030-00
KAIG3-RFI-SG-C-2252 01 KAIG3-RFI-SG-C-2252-01
KAIG3-RFI-WG-LS-1249 00 KAIG3-RFI-WG-LS-1249-00
KAIG3-RFI-WG-LS-1248 00 KAIG3-RFI-WG-LS-1248-00
KAIG3-RFI-CO-S-6636 00 KAIG3-RFI-CO-S-6636-00
KAIG3-RFI-WG-C-3729 01 KAIG3-RFI-WG-C-3729-01
KAIG3-RFI-WG-LS-1247 00 KAIG3-RFI-WG-LS-1247-00
KAIG3-RFI-CO-S-6637 00 KAIG3-RFI-CO-S-6637-00
KAIG3-RFI-WG-LS-1246 00 KAIG3-RFI-WG-LS-1246-00
KAIG3-RFI-MB-C-4001 00 KAIG3-RFI-MB-C-4001-00
KAIG3-RFI-MB-C-3992 00 KAIG3-RFI-MB-C-3992-00
KAIG3-RFI-WG-LS-1245 00 KAIG3-RFI-WG-LS-1245-00
KAIG3-RFI-SW-C-4031 00 KAIG3-RFI-SW-C-4031-00
KAIG3-RFI-SW-C-2242 03 KAIG3-RFI-SW-C-2242-03
KAIG3-RFI-SW-C-3412 01 KAIG3-RFI-SW-C-3412-01
KAIG3-RFI-SW-C-2240 03 KAIG3-RFI-SW-C-2240-03
KAIG3-RFI-SW-C-3414 01 KAIG3-RFI-SW-C-3414-01
KAIG3-RFI-SW-C-4020 00 KAIG3-RFI-SW-C-4020-00
KAIG3-RFI-SW-LC-0483 00 KAIG3-RFI-SW-LC-0483-00
KAIG3-RFI-SW-LC-0482 00 KAIG3-RFI-SW-LC-0482-00
KAIG3-RFI-SW-LS-1240 00 KAIG3-RFI-SW-LS-1240-00
KAIG3-RFI-SW-LS-1239 00 KAIG3-RFI-SW-LS-1239-00
KAIG3-RFI-SW-C-3993 00 KAIG3-RFI-SW-C-3993-00
KAIG3-RFI-SW-C-3982 00 KAIG3-RFI-SW-C-3982-00
KAIG3-RFI-SW-C-3981 00 KAIG3-RFI-SW-C-3981-00
KAIG3-RFI-SW-C-3980 00 KAIG3-RFI-SW-C-3980-00
KAIG3-RFI-SW-C-3979 00 KAIG3-RFI-SW-C-3979-00
KAIG3-RFI-SW-C-3978 00 KAIG3-RFI-SW-C-3978-00
KAIG3-RFI-SW-C-3977 00 KAIG3-RFI-SW-C-3977-00
KAIG3-RFI-SW-C-3964 00 KAIG3-RFI-SW-C-3964-00
KAIG3-RFI-SW-C-3963 00 KAIG3-RFI-SW-C-3963-00
KAIG3-RFI-SW-C-3962 00 KAIG3-RFI-SW-C-3962-00
KAIG3-RFI-WG-LS-1244 00 KAIG3-RFI-WG-LS-1244-00
KAIG3-RFI-SW-C-3961 00 KAIG3-RFI-SW-C-3961-00
KAIG3-RFI-WG-LS-1243 00 KAIG3-RFI-WG-LS-1243-00
KAIG3-RFI-TG-C-3991 00 KAIG3-RFI-TG-C-3991-00
KAIG3-RFI-SG-P-0201 00 KAIG3-RFI-SG-P-0201-00
KAIG3-RFI-WG-C-3990 00 KAIG3-RFI-WG-C-3990-00
KAIG3-RFI-SG-LS-1242 00 KAIG3-RFI-SG-LS-1242-00
KAIG3-RFI-SG-LS-1241 00 KAIG3-RFI-SG-LS-1241-00
KAIG3-RFI-ZG-C-3920 00 KAIG3-RFI-ZG-C-3920-00
KAIG3-RFI-SW-C-3362 01 KAIG3-RFI-SW-C-3362-01
KAIG3-RFI-LM-C-3987 00 KAIG3-RFI-LM-C-3987-00
KAIG3-RFI-CO-C-3988 00 KAIG3-RFI-CO-C-3988-00
KAIG3-RFI-MC-C-3989 00 KAIG3-RFI-MC-C-3989-00
KAIG3-RFI-CO-SU-2260 00 KAIG3-RFI-CO-SU-2260-00
KAIG3-RFI-CC-SU-2261 00 KAIG3-RFI-CC-SU-2261-00
KAIG3-RFI-LM-S-6624 00 KAIG3-RFI-LM-S-6624-00
KAIG3-RFI-CO-S-6625 00 KAIG3-RFI-CO-S-6625-00
KAIG3-RFI-CO-S-6632 00 KAIG3-RFI-CO-S-6632-00
KAIG3-RFI-CO-S-6626 00 KAIG3-RFI-CO-S-6626-00
KAIG3-RFI-CO-S-6627 00 KAIG3-RFI-CO-S-6627-00
KAIG3-RFI-CO-S-6628 00 KAIG3-RFI-CO-S-6628-00
KAIG3-RFI-CO-S-6496 00 KAIG3-RFI-CO-S-6496-00
KAIG3-RFI-CO-S-6433 00 KAIG3-RFI-CO-S-6433-00
KAIG3-RFI-CO-S-6559 00 KAIG3-RFI-CO-S-6559-00
KAIG3-RFI-CO-S-6600 00 KAIG3-RFI-CO-S-6600-00
KAIG3-RFI-CO-S-6629 00 KAIG3-RFI-CO-S-6629-00
KAIG3-RFI-CO-S-6630 00 KAIG3-RFI-CO-S-6630-00
KAIG3-RFI-CO-S-6631 00 KAIG3-RFI-CO-S-6631-00
KAIG3-RFI-CC-S-6633 00 KAIG3-RFI-CC-S-6633-00
KAIG3-RFI-CC-S-6634 00 KAIG3-RFI-CC-S-6634-00
KAIG3-RFI-SW-LS-1238 00 KAIG3-RFI-SW-LS-1238-00
KAIG3-RFI-SW-LS-1237 00 KAIG3-RFI-SW-LS-1237-00
KAIG3-RFI-SW-C-3976 00 KAIG3-RFI-SW-C-3976-00
KAIG3-RFI-SW-C-3974 00 KAIG3-RFI-SW-C-3974-00
KAIG3-RFI-SW-C-3973 00 KAIG3-RFI-SW-C-3973-00
KAIG3-RFI-SW-C-3966 00 KAIG3-RFI-SW-C-3966-00
KAIG3-RFI-SW-C-3965 00 KAIG3-RFI-SW-C-3965-00
KAIG3-RFI-SW-C-3960 00 KAIG3-RFI-SW-C-3960-00
KAIG3-RFI-SW-C-3959 00 KAIG3-RFI-SW-C-3959-00
KAIG3-RFI-SW-C-3803 01 KAIG3-RFI-SW-C-3803-01
KAIG3-RFI-SW-C-3804 01 KAIG3-RFI-SW-C-3804-01
KAIG3-RFI-SW-C-3975 00 KAIG3-RFI-SW-C-3975-00
KAIG3-RFI-SW-S-6608 00 KAIG3-RFI-SW-S-6608-00
KAIG3-RFI-TG-S-6607 00 KAIG3-RFI-TG-S-6607-00
KAIG3-RFI-TG-SU-2255 00 KAIG3-RFI-TG-SU-2255-00
KAIG3-RFI-DG-C-3919 00 KAIG3-RFI-DG-C-3919-00
KAIG3-RFI-PC-LC-0481 00 KAIG3-RFI-PC-LC-0481-00
KAIG3-RFI-SW-LC-0480 00 KAIG3-RFI-SW-LC-0480-00
KAIG3-RFI-SW-LC-0479 00 KAIG3-RFI-SW-LC-0479-00
KAIG3-RFI-CO-C-3986 00 KAIG3-RFI-CO-C-3986-00
KAIG3-RFI-SW-E-0395 00 KAIG3-RFI-SW-E-0395-00
KAIG3-RFI-CO-SS-0085 00 KAIG3-RFI-CO-SS-0085-00
KAIG3-RFI-CO-SS-0086 00 KAIG3-RFI-CO-SS-0086-00
KAIG3-RFI-CO-SS-0046 01 KAIG3-RFI-CO-SS-0046-01
KAIG3-RFI-CC-SU-2259 00 KAIG3-RFI-CC-SU-2259-00
KAIG3-RFI-MC-SU-2256 00 KAIG3-RFI-MC-SU-2256-00
KAIG3-RFI-CO-SU-2257 00 KAIG3-RFI-CO-SU-2257-00
KAIG3-RFI-CO-SU-2258 00 KAIG3-RFI-CO-SU-2258-00
KAIG3-RFI-CC-S-6622 00 KAIG3-RFI-CC-S-6622-00
KAIG3-RFI-CO-S-6610 00 KAIG3-RFI-CO-S-6610-00
KAIG3-RFI-CO-S-6611 00 KAIG3-RFI-CO-S-6611-00
KAIG3-RFI-MC-S-6612 00 KAIG3-RFI-MC-S-6612-00
KAIG3-RFI-MC-S-6613 00 KAIG3-RFI-MC-S-6613-00
KAIG3-RFI-MC-S-6614 00 KAIG3-RFI-MC-S-6614-00
KAIG3-RFI-MC-S-6615 00 KAIG3-RFI-MC-S-6615-00
KAIG3-RFI-CO-S-6616 00 KAIG3-RFI-CO-S-6616-00
KAIG3-RFI-CO-S-6618 00 KAIG3-RFI-CO-S-6618-00
KAIG3-RFI-CO-S-6619 00 KAIG3-RFI-CO-S-6619-00
KAIG3-RFI-MC-C-3969 00 KAIG3-RFI-MC-C-3969-00
KAIG3-RFI-LM-C-3968 00 KAIG3-RFI-LM-C-3968-00
KAIG3-RFI-LM-C-3958 00 KAIG3-RFI-LM-C-3958-00
KAIG3-RFI-MC-C-3970 00 KAIG3-RFI-MC-C-3970-00
KAIG3-RFI-CO-C-3971 00 KAIG3-RFI-CO-C-3971-00
KAIG3-RFI-MC-S-6606 00 KAIG3-RFI-MC-S-6606-00
KAIG3-RFI-LM-S-6601 00 KAIG3-RFI-LM-S-6601-00
KAIG3-RFI-CO-S-6604 00 KAIG3-RFI-CO-S-6604-00
KAIG3-RFI-CO-S-6603 00 KAIG3-RFI-CO-S-6603-00
KAIG3-RFI-CO-S-6602 00 KAIG3-RFI-CO-S-6602-00
KAIG3-RFI-SW-C-3984 00 KAIG3-RFI-SW-C-3984-00
KAIG3-RFI-SW-P-0200 00 KAIG3-RFI-SW-P-0200-00
KAIG3-RFI-SW-E-0402 00 KAIG3-RFI-SW-E-0402-00
KAIG3-RFI-SW-LS-1236 00 KAIG3-RFI-SW-LS-1236-00
KAIG3-RFI-SW-LS-1235 00 KAIG3-RFI-SW-LS-1235-00
KAIG3-RFI-SW-C-3957 00 KAIG3-RFI-SW-C-3957-00
KAIG3-RFI-SW-C-3949 00 KAIG3-RFI-SW-C-3949-00
KAIG3-RFI-SW-C-3948 00 KAIG3-RFI-SW-C-3948-00
KAIG3-RFI-SW-C-3947 00 KAIG3-RFI-SW-C-3947-00
KAIG3-RFI-SW-C-3946 00 KAIG3-RFI-SW-C-3946-00
KAIG3-RFI-SW-C-3945 00 KAIG3-RFI-SW-C-3945-00
KAIG3-RFI-SW-C-3944 00 KAIG3-RFI-SW-C-3944-00
KAIG3-RFI-SW-C-3943 00 KAIG3-RFI-SW-C-3943-00
KAIG3-RFI-SW-C-3942 00 KAIG3-RFI-SW-C-3942-00
KAIG3-RFI-SW-C-3941 00 KAIG3-RFI-SW-C-3941-00
KAIG3-RFI-SW-C-3940 00 KAIG3-RFI-SW-C-3940-00
KAIG3-RFI-SW-C-3939 00 KAIG3-RFI-SW-C-3939-00
KAIG3-RFI-SW-C-3938 00 KAIG3-RFI-SW-C-3938-00
KAIG3-RFI-SW-C-3937 00 KAIG3-RFI-SW-C-3937-00
KAIG3-RFI-SW-C-3936 00 KAIG3-RFI-SW-C-3936-00
KAIG3-RFI-SW-C-3935 00 KAIG3-RFI-SW-C-3935-00
KAIG3-RFI-SW-C-3934 00 KAIG3-RFI-SW-C-3934-00
KAIG3-RFI-SW-C-3933 00 KAIG3-RFI-SW-C-3933-00
KAIG3-RFI-SW-C-3932 00 KAIG3-RFI-SW-C-3932-00
KAIG3-RFI-SW-C-3931 00 KAIG3-RFI-SW-C-3931-00
KAIG3-RFI-SW-C-3930 00 KAIG3-RFI-SW-C-3930-00
KAIG3-RFI-SW-C-3929 00 KAIG3-RFI-SW-C-3929-00
KAIG3-RFI-SW-C-3928 00 KAIG3-RFI-SW-C-3928-00
KAIG3-RFI-SW-C-3927 00 KAIG3-RFI-SW-C-3927-00
KAIG3-RFI-SW-C-3926 00 KAIG3-RFI-SW-C-3926-00
KAIG3-RFI-SW-C-3925 00 KAIG3-RFI-SW-C-3925-00
KAIG3-RFI-SW-C-3924 00 KAIG3-RFI-SW-C-3924-00
KAIG3-RFI-SW-C-3923 00 KAIG3-RFI-SW-C-3923-00
KAIG3-RFI-SW-C-3922 00 KAIG3-RFI-SW-C-3922-00
KAIG3-RFI-SW-C-3921 00 KAIG3-RFI-SW-C-3921-00
KAIG3-RFI-SW-C-3915 00 KAIG3-RFI-SW-C-3915-00
KAIG3-RFI-SW-C-3914 00 KAIG3-RFI-SW-C-3914-00
KAIG3-RFI-SW-C-3913 00 KAIG3-RFI-SW-C-3913-00
KAIG3-RFI-SW-C-3912 00 KAIG3-RFI-SW-C-3912-00
KAIG3-RFI-MB-C-3486 01 KAIG3-RFI-MB-C-3486-01
KAIG3-RFI-TB-S-6595 00 KAIG3-RFI-TB-S-6595-00
KAIG3-RFI-TB-SU-2252 00 KAIG3-RFI-TB-SU-2252-00
KAIG3-RFI-WG-C-3918 00 KAIG3-RFI-WG-C-3918-00
KAIG3-RFI-CO-C-3954 00 KAIG3-RFI-CO-C-3954-00
KAIG3-RFI-CO-C-3955 00 KAIG3-RFI-CO-C-3955-00
KAIG3-RFI-MC-C-3956 00 KAIG3-RFI-MC-C-3956-00
KAIG3-RFI-MC-C-3950 00 KAIG3-RFI-MC-C-3950-00
KAIG3-RFI-MC-C-3951 00 KAIG3-RFI-MC-C-3951-00
KAIG3-RFI-CO-C-3952 00 KAIG3-RFI-CO-C-3952-00
KAIG3-RFI-CO-C-3953 00 KAIG3-RFI-CO-C-3953-00
KAIG3-RFI-CO-SU-2253 00 KAIG3-RFI-CO-SU-2253-00
KAIG3-RFI-CO-SU-2254 00 KAIG3-RFI-CO-SU-2254-00
KAIG3-RFI-LM-S-6415 00 KAIG3-RFI-LM-S-6415-00
KAIG3-RFI-CO-S-6596 00 KAIG3-RFI-CO-S-6596-00
KAIG3-RFI-CO-S-6597 00 KAIG3-RFI-CO-S-6597-00
KAIG3-RFI-CO-S-6598 00 KAIG3-RFI-CO-S-6598-00
KAIG3-RFI-CO-S-6599 00 KAIG3-RFI-CO-S-6599-00
KAIG3-RFI-CO-S-6552 00 KAIG3-RFI-CO-S-6552-00
KAIG3-RFI-CO-S-6587 00 KAIG3-RFI-CO-S-6587-00
KAIG3-RFI-CO-S-6591 00 KAIG3-RFI-CO-S-6591-00
KAIG3-RFI-CO-SS-0084 00 KAIG3-RFI-CO-SS-0084-00
KAIG3-RFI-CC-SU-2250 00 KAIG3-RFI-CC-SU-2250-00
KAIG3-RFI-LM-S-6554 00 KAIG3-RFI-LM-S-6554-00
KAIG3-RFI-LM-S-6582 00 KAIG3-RFI-LM-S-6582-00
KAIG3-RFI-CO-S-6589 00 KAIG3-RFI-CO-S-6589-00
KAIG3-RFI-CO-S-6555 00 KAIG3-RFI-CO-S-6555-00
KAIG3-RFI-CO-S-6590 00 KAIG3-RFI-CO-S-6590-00
KAIG3-RFI-CO-S-6562 00 KAIG3-RFI-CO-S-6562-00
KAIG3-RFI-MC-SU-2251 00 KAIG3-RFI-MC-SU-2251-00
KAIG3-RFI-MC-S-6593 00 KAIG3-RFI-MC-S-6593-00
KAIG3-RFI-MC-S-6592 00 KAIG3-RFI-MC-S-6592-00
KAIG3-RFI-CO-SS-0070 01 KAIG3-RFI-CO-SS-0070-01
KAIG3-RFI-CO-A-0657 02 KAIG3-RFI-CO-A-0657-02
KAIG3-RFI-CO-SS-0083 00 KAIG3-RFI-CO-SS-0083-00
KAIG3-RFI-SW-E-0401 00 KAIG3-RFI-SW-E-0401-00
KAIG3-RFI-SW-C-3255 03 KAIG3-RFI-SW-C-3255-03
KAIG3-RFI-SW-C-3417-00 01 KAIG3-RFI-SW-C-3417-00-01
KAIG3-RFI-SW-E-0400 00 KAIG3-RFI-SW-E-0400-00
KAIG3-RFI-WG-LS-1234 00 KAIG3-RFI-WG-LS-1234-00
KAIG3-RFI-SW-S-6588 00 KAIG3-RFI-SW-S-6588-00
KAIG3-RFI-SW-C-3907 00 KAIG3-RFI-SW-C-3907-00
KAIG3-RFI-ZG-C-3906 00 KAIG3-RFI-ZG-C-3906-00
KAIG3-RFI-SG-C-3883 00 KAIG3-RFI-SG-C-3883-00
KAIG3-RFI-MB-A-0759 00 KAIG3-RFI-MB-A-0759-00
KAIG3-RFI-TT-A-0758 00 KAIG3-RFI-TT-A-0758-00
KAIG3-RFI-TG-S-6568 00 KAIG3-RFI-TG-S-6568-00
KAIG3-RFI-TG-S-6567 00 KAIG3-RFI-TG-S-6567-00
KAIG3-RFI-TG-S-6566 00 KAIG3-RFI-TG-S-6566-00
KAIG3-RFI-MB-A-0757 00 KAIG3-RFI-MB-A-0757-00
KAIG3-RFI-WG-LS-1233 00 KAIG3-RFI-WG-LS-1233-00
KAIG3-RFI-WG-LS-1232 00 KAIG3-RFI-WG-LS-1232-00
KAIG3-RFI-PG-C-3901 00 KAIG3-RFI-PG-C-3901-00
KAIG3-RFI-SG-C-3882 00 KAIG3-RFI-SG-C-3882-00
KAIG3-RFI-DG-C-3881 00 KAIG3-RFI-DG-C-3881-00
KAIG3-RFI-SW-C-3911 00 KAIG3-RFI-SW-C-3911-00
KAIG3-RFI-SW-C-3910 00 KAIG3-RFI-SW-C-3910-00
KAIG3-RFI-SW-C-3909 00 KAIG3-RFI-SW-C-3909-00
KAIG3-RFI-SW-C-3908 00 KAIG3-RFI-SW-C-3908-00
KAIG3-RFI-SW-C-3905 00 KAIG3-RFI-SW-C-3905-00
KAIG3-RFI-SW-C-3904 00 KAIG3-RFI-SW-C-3904-00
KAIG3-RFI-SW-C-3903 00 KAIG3-RFI-SW-C-3903-00
KAIG3-RFI-SW-C-3902 00 KAIG3-RFI-SW-C-3902-00
KAIG3-RFI-SW-C-3900 00 KAIG3-RFI-SW-C-3900-00
KAIG3-RFI-SW-C-3899 00 KAIG3-RFI-SW-C-3899-00
KAIG3-RFI-SW-C-3898 00 KAIG3-RFI-SW-C-3898-00
KAIG3-RFI-SW-C-3897 00 KAIG3-RFI-SW-C-3897-00
KAIG3-RFI-SW-C-3896 00 KAIG3-RFI-SW-C-3896-00
KAIG3-RFI-SW-C-3895 00 KAIG3-RFI-SW-C-3895-00
KAIG3-RFI-SW-C-3894 00 KAIG3-RFI-SW-C-3894-00
KAIG3-RFI-SW-C-3893 00 KAIG3-RFI-SW-C-3893-00
KAIG3-RFI-SW-C-3892 00 KAIG3-RFI-SW-C-3892-00
KAIG3-RFI-SW-C-3891 00 KAIG3-RFI-SW-C-3891-00
KAIG3-RFI-SW-C-3890 00 KAIG3-RFI-SW-C-3890-00
KAIG3-RFI-AG-SS-0082 00 KAIG3-RFI-AG-SS-0082-00
KAIG3-RFI-CO-SS-0081 00 KAIG3-RFI-CO-SS-0081-00
KAIG3-RFI-CO-C-3917 00 KAIG3-RFI-CO-C-3917-00
KAIG3-RFI-MC-C-3916 00 KAIG3-RFI-MC-C-3916-00
KAIG3-RFI-CO-C-3884 00 KAIG3-RFI-CO-C-3884-00
KAIG3-RFI-MC-C-3887 00 KAIG3-RFI-MC-C-3887-00
KAIG3-RFI-MC-C-3888 00 KAIG3-RFI-MC-C-3888-00
KAIG3-RFI-CO-C-3869 00 KAIG3-RFI-CO-C-3869-00
KAIG3-RFI-CO-C-3886 00 KAIG3-RFI-CO-C-3886-00
KAIG3-RFI-CO-C-3885 00 KAIG3-RFI-CO-C-3885-00
KAIG3-RFI-CO-SU-2248 00 KAIG3-RFI-CO-SU-2248-00
KAIG3-RFI-CO-SU-2249 00 KAIG3-RFI-CO-SU-2249-00
KAIG3-RFI-CC-SU-2247 00 KAIG3-RFI-CC-SU-2247-00
KAIG3-RFI-CC-SU-2246 00 KAIG3-RFI-CC-SU-2246-00
KAIG3-RFI-CO-S-6577 00 KAIG3-RFI-CO-S-6577-00
KAIG3-RFI-CO-S-6578 00 KAIG3-RFI-CO-S-6578-00
KAIG3-RFI-CO-S-6583 00 KAIG3-RFI-CO-S-6583-00
KAIG3-RFI-CO-S-6584 00 KAIG3-RFI-CO-S-6584-00
KAIG3-RFI-CO-S-6586 00 KAIG3-RFI-CO-S-6586-00
KAIG3-RFI-CO-S-6585 00 KAIG3-RFI-CO-S-6585-00
KAIG3-RFI-CO-S-6402 01 KAIG3-RFI-CO-S-6402-01
KAIG3-RFI-CO-S-6401 01 KAIG3-RFI-CO-S-6401-01
KAIG3-RFI-CO-S-6412 01 KAIG3-RFI-CO-S-6412-01
KAIG3-RFI-CO-S-6573 00 KAIG3-RFI-CO-S-6573-00
KAIG3-RFI-CO-S-6574 00 KAIG3-RFI-CO-S-6574-00
KAIG3-RFI-CO-S-6575 00 KAIG3-RFI-CO-S-6575-00
KAIG3-RFI-CO-S-6576 00 KAIG3-RFI-CO-S-6576-00
KAIG3-RFI-CO-SS-0080 00 KAIG3-RFI-CO-SS-0080-00
KAIG3-RFI-MC-S-6569 00 KAIG3-RFI-MC-S-6569-00
KAIG3-RFI-CC-S-6570 00 KAIG3-RFI-CC-S-6570-00
KAIG3-RFI-LM-LC-0459 00 KAIG3-RFI-LM-LC-0459-00
KAIG3-RFI-CC-S-6571 00 KAIG3-RFI-CC-S-6571-00
KAIG3-RFI-WG-LS-1231 00 KAIG3-RFI-WG-LS-1231-00
KAIG3-RFI-WG-LS-1230 00 KAIG3-RFI-WG-LS-1230-00
KAIG3-RFI-ZG-C-3864 00 KAIG3-RFI-ZG-C-3864-00
KAIG3-RFI-SW-SU-2245 00 KAIG3-RFI-SW-SU-2245-00
KAIG3-RFI-DG-LS-1229 00 KAIG3-RFI-DG-LS-1229-00
KAIG3-RFI-TG-C-3863 00 KAIG3-RFI-TG-C-3863-00
KAIG3-RFI-ZG-C-3862 00 KAIG3-RFI-ZG-C-3862-00
KAIG3-RFI-WG-C-3861 00 KAIG3-RFI-WG-C-3861-00
KAIG3-RFI-SW-C-3833 00 KAIG3-RFI-SW-C-3833-00
KAIG3-RFI-WG-LS-1228 00 KAIG3-RFI-WG-LS-1228-00
KAIG3-RFI-WG-LS-1227 00 KAIG3-RFI-WG-LS-1227-00
KAIG3-RFI-WG-LS-1226 00 KAIG3-RFI-WG-LS-1226-00
KAIG3-RFI-WG-LS-1225 00 KAIG3-RFI-WG-LS-1225-00
KAIG3-RFI-WG-LS-1224 00 KAIG3-RFI-WG-LS-1224-00
KAIG3-RFI-WG-LS-1223 00 KAIG3-RFI-WG-LS-1223-00
KAIG3-RFI-WG-LS-1222 00 KAIG3-RFI-WG-LS-1222-00
KAIG3-RFI-WG-LS-1221 00 KAIG3-RFI-WG-LS-1221-00
KAIG3-RFI-CO-C-3878 00 KAIG3-RFI-CO-C-3878-00
KAIG3-RFI-MC-C-3879 00 KAIG3-RFI-MC-C-3879-00
KAIG3-RFI-CO-C-3877 00 KAIG3-RFI-CO-C-3877-00
KAIG3-RFI-SW-C-3876 00 KAIG3-RFI-SW-C-3876-00
KAIG3-RFI-MC-C-3866 00 KAIG3-RFI-MC-C-3866-00
KAIG3-RFI-SW-C-3875 00 KAIG3-RFI-SW-C-3875-00
KAIG3-RFI-MC-C-3865 00 KAIG3-RFI-MC-C-3865-00
KAIG3-RFI-SW-C-3874 00 KAIG3-RFI-SW-C-3874-00
KAIG3-RFI-CO-C-3889 00 KAIG3-RFI-CO-C-3889-00
KAIG3-RFI-SW-C-3873 00 KAIG3-RFI-SW-C-3873-00
KAIG3-RFI-CO-C-3867 00 KAIG3-RFI-CO-C-3867-00
KAIG3-RFI-SW-C-3872 00 KAIG3-RFI-SW-C-3872-00
KAIG3-RFI-CO-C-3868 00 KAIG3-RFI-CO-C-3868-00
KAIG3-RFI-SW-C-3871 00 KAIG3-RFI-SW-C-3871-00
KAIG3-RFI-CO-SS-0076 00 KAIG3-RFI-CO-SS-0076-00
KAIG3-RFI-SW-C-3870 00 KAIG3-RFI-SW-C-3870-00
KAIG3-RFI-SW-C-3860 00 KAIG3-RFI-SW-C-3860-00
KAIG3-RFI-SW-C-3859 00 KAIG3-RFI-SW-C-3859-00
KAIG3-RFI-CO-SS-0079 00 KAIG3-RFI-CO-SS-0079-00
KAIG3-RFI-CO-SU-2243 00 KAIG3-RFI-CO-SU-2243-00
KAIG3-RFI-SW-C-3858 00 KAIG3-RFI-SW-C-3858-00
KAIG3-RFI-CO-SU-2244 00 KAIG3-RFI-CO-SU-2244-00
KAIG3-RFI-SW-C-3857 00 KAIG3-RFI-SW-C-3857-00
KAIG3-RFI-CO-SU-2242 00 KAIG3-RFI-CO-SU-2242-00
KAIG3-RFI-MC-S-6565 00 KAIG3-RFI-MC-S-6565-00
KAIG3-RFI-SW-C-3856 00 KAIG3-RFI-SW-C-3856-00
KAIG3-RFI-SW-C-3855 00 KAIG3-RFI-SW-C-3855-00
KAIG3-RFI-SW-C-3854 00 KAIG3-RFI-SW-C-3854-00
KAIG3-RFI-CO-S-6561 00 KAIG3-RFI-CO-S-6561-00
KAIG3-RFI-SW-C-3453 01 KAIG3-RFI-SW-C-3453-01
KAIG3-RFI-CO-S-6563 00 KAIG3-RFI-CO-S-6563-00
KAIG3-RFI-SW-C-1817 01 KAIG3-RFI-SW-C-1817-01
KAIG3-RFI-CO-S-6564 00 KAIG3-RFI-CO-S-6564-00
KAIG3-RFI-CO-S-6560 00 KAIG3-RFI-CO-S-6560-00
KAIG3-RFI-CO-S-6556 00 KAIG3-RFI-CO-S-6556-00
KAIG3-RFI-MC-S-6557 00 KAIG3-RFI-MC-S-6557-00
KAIG3-RFI-CO-S-6558 00 KAIG3-RFI-CO-S-6558-00
KAIG3-RFI-SW-LC-0478 00 KAIG3-RFI-SW-LC-0478-00
KAIG3-RFI-SW-LC-0477 00 KAIG3-RFI-SW-LC-0477-00
KAIG3-RFI-ZG-C-3611 00 KAIG3-RFI-ZG-C-3611-00
KAIG3-RFI-SG-C-3832 00 KAIG3-RFI-SG-C-3832-00
KAIG3-RFI-SG-C-3831 00 KAIG3-RFI-SG-C-3831-00
KAIG3-RFI-WG-C-3830 00 KAIG3-RFI-WG-C-3830-00
KAIG3-RFI-TG-S-6549 00 KAIG3-RFI-TG-S-6549-00
KAIG3-RFI-ZG-C-3829 00 KAIG3-RFI-ZG-C-3829-00
KAIG3-RFI-TT-A-0756 00 KAIG3-RFI-TT-A-0756-00
KAIG3-RFI-PG-C-3828 00 KAIG3-RFI-PG-C-3828-00
KAIG3-RFI-TG-C-3813 00 KAIG3-RFI-TG-C-3813-00
KAIG3-RFI-WG-LS-1220 00 KAIG3-RFI-WG-LS-1220-00
KAIG3-RFI-TG-S-6540 00 KAIG3-RFI-TG-S-6540-00
KAIG3-RFI-TG-SU-2238 00 KAIG3-RFI-TG-SU-2238-00
KAIG3-RFI-DG-C-3808 00 KAIG3-RFI-DG-C-3808-00
KAIG3-RFI-WG-C-3807 00 KAIG3-RFI-WG-C-3807-00
KAIG3-RFI-MC-C-3842 00 KAIG3-RFI-MC-C-3842-00
KAIG3-RFI-MC-C-3844 00 KAIG3-RFI-MC-C-3844-00
KAIG3-RFI-MC-C-3843 00 KAIG3-RFI-MC-C-3843-00
KAIG3-RFI-SW-C-3853 00 KAIG3-RFI-SW-C-3853-00
KAIG3-RFI-MC-C-3839 00 KAIG3-RFI-MC-C-3839-00
KAIG3-RFI-SW-C-3852 00 KAIG3-RFI-SW-C-3852-00
KAIG3-RFI-SW-C-3851 00 KAIG3-RFI-SW-C-3851-00
KAIG3-RFI-MC-C-3827 00 KAIG3-RFI-MC-C-3827-00
KAIG3-RFI-SW-C-3850 00 KAIG3-RFI-SW-C-3850-00
KAIG3-RFI-MC-C-3840 00 KAIG3-RFI-MC-C-3840-00
KAIG3-RFI-SW-C-3849 00 KAIG3-RFI-SW-C-3849-00
KAIG3-RFI-SW-C-3848 00 KAIG3-RFI-SW-C-3848-00
KAIG3-RFI-SW-C-3847 00 KAIG3-RFI-SW-C-3847-00
KAIG3-RFI-SW-C-3846 00 KAIG3-RFI-SW-C-3846-00
KAIG3-RFI-MC-C-3841 00 KAIG3-RFI-MC-C-3841-00
KAIG3-RFI-SW-C-3845 00 KAIG3-RFI-SW-C-3845-00
KAIG3-RFI-CO-C-3814 00 KAIG3-RFI-CO-C-3814-00
KAIG3-RFI-SW-C-3838 00 KAIG3-RFI-SW-C-3838-00
KAIG3-RFI-SW-C-3837 00 KAIG3-RFI-SW-C-3837-00
KAIG3-RFI-CO-C-3826 00 KAIG3-RFI-CO-C-3826-00
KAIG3-RFI-SW-C-3836 00 KAIG3-RFI-SW-C-3836-00
KAIG3-RFI-CO-SU-2241 00 KAIG3-RFI-CO-SU-2241-00
KAIG3-RFI-SW-C-3835 00 KAIG3-RFI-SW-C-3835-00
KAIG3-RFI-SW-C-3834 00 KAIG3-RFI-SW-C-3834-00
KAIG3-RFI-CO-SU-2239 00 KAIG3-RFI-CO-SU-2239-00
KAIG3-RFI-SW-C-3825 00 KAIG3-RFI-SW-C-3825-00
KAIG3-RFI-SW-C-3824 00 KAIG3-RFI-SW-C-3824-00
KAIG3-RFI-MC-SU-2240 00 KAIG3-RFI-MC-SU-2240-00
KAIG3-RFI-SW-C-3823 00 KAIG3-RFI-SW-C-3823-00
KAIG3-RFI-CO-SU-2237 00 KAIG3-RFI-CO-SU-2237-00
KAIG3-RFI-SW-C-3822 00 KAIG3-RFI-SW-C-3822-00
KAIG3-RFI-SW-C-3821 00 KAIG3-RFI-SW-C-3821-00
KAIG3-RFI-CO-SS-0075 00 KAIG3-RFI-CO-SS-0075-00
KAIG3-RFI-SW-C-3820 00 KAIG3-RFI-SW-C-3820-00
KAIG3-RFI-SW-C-3819 00 KAIG3-RFI-SW-C-3819-00
KAIG3-RFI-CO-SS-0078 00 KAIG3-RFI-CO-SS-0078-00
KAIG3-RFI-SW-C-3818 00 KAIG3-RFI-SW-C-3818-00
KAIG3-RFI-SW-C-3817 00 KAIG3-RFI-SW-C-3817-00
KAIG3-RFI-CO-S-6548 00 KAIG3-RFI-CO-S-6548-00
KAIG3-RFI-SW-C-3816 00 KAIG3-RFI-SW-C-3816-00
KAIG3-RFI-SW-C-3815 00 KAIG3-RFI-SW-C-3815-00
KAIG3-RFI-CO-S-6551 00 KAIG3-RFI-CO-S-6551-00
KAIG3-RFI-MC-S-6553 00 KAIG3-RFI-MC-S-6553-00
KAIG3-RFI-CO-S-6550 00 KAIG3-RFI-CO-S-6550-00
KAIG3-RFI-CO-S-6545 00 KAIG3-RFI-CO-S-6545-00
KAIG3-RFI-CO-S-6543 00 KAIG3-RFI-CO-S-6543-00
KAIG3-RFI-MC-S-6546 00 KAIG3-RFI-MC-S-6546-00
KAIG3-RFI-MC-S-6547 00 KAIG3-RFI-MC-S-6547-00
KAIG3-RFI-CO-S-6541 00 KAIG3-RFI-CO-S-6541-00
KAIG3-RFI-CO-S-6542 00 KAIG3-RFI-CO-S-6542-00
KAIG3-RFI-CO-S-6544 00 KAIG3-RFI-CO-S-6544-00
KAIG3-RFI-CO-S-6537 00 KAIG3-RFI-CO-S-6537-00
KAIG3-RFI-CO-S-6539 00 KAIG3-RFI-CO-S-6539-00
KAIG3-RFI-CO-S-6538 00 KAIG3-RFI-CO-S-6538-00
KAIG3-RFI-ZG-P-0198 00 KAIG3-RFI-ZG-P-0198-00
KAIG3-RFI-SW-P-0199 00 KAIG3-RFI-SW-P-0199-00
KAIG3-RFI-SW-C-3812 00 KAIG3-RFI-SW-C-3812-00
KAIG3-RFI-SW-C-3811 00 KAIG3-RFI-SW-C-3811-00
KAIG3-RFI-SW-C-3810 00 KAIG3-RFI-SW-C-3810-00
KAIG3-RFI-SW-C-3809 00 KAIG3-RFI-SW-C-3809-00
KAIG3-RFI-SW-C-3805 00 KAIG3-RFI-SW-C-3805-00
KAIG3-RFI-SW-C-3804 00 KAIG3-RFI-SW-C-3804-00
KAIG3-RFI-SW-C-3803 00 KAIG3-RFI-SW-C-3803-00
KAIG3-RFI-SW-C-3802 00 KAIG3-RFI-SW-C-3802-00
KAIG3-RFI-SW-C-3801 00 KAIG3-RFI-SW-C-3801-00
KAIG3-RFI-SW-C-3800 00 KAIG3-RFI-SW-C-3800-00
KAIG3-RFI-SW-C-3799 00 KAIG3-RFI-SW-C-3799-00
KAIG3-RFI-SW-C-3795 00 KAIG3-RFI-SW-C-3795-00
KAIG3-RFI-SW-C-3794 00 KAIG3-RFI-SW-C-3794-00
KAIG3-RFI-SW-C-3793 00 KAIG3-RFI-SW-C-3793-00
KAIG3-RFI-SW-C-3792 00 KAIG3-RFI-SW-C-3792-00
KAIG3-RFI-SW-C-3791 00 KAIG3-RFI-SW-C-3791-00
KAIG3-RFI-SW-C-3790 00 KAIG3-RFI-SW-C-3790-00
KAIG3-RFI-SW-C-3782 00 KAIG3-RFI-SW-C-3782-00
KAIG3-RFI-SW-C-3714 00 KAIG3-RFI-SW-C-3714-00
KAIG3-RFI-SW-C-3713 00 KAIG3-RFI-SW-C-3713-00
KAIG3-RFI-SW-C-3712 00 KAIG3-RFI-SW-C-3712-00
KAIG3-RFI-SW-C-3711 00 KAIG3-RFI-SW-C-3711-00
KAIG3-RFI-SW-C-3710 00 KAIG3-RFI-SW-C-3710-00
KAIG3-RFI-SW-C-3709 00 KAIG3-RFI-SW-C-3709-00
KAIG3-RFI-SW-C-3705 00 KAIG3-RFI-SW-C-3705-00
KAIG3-RFI-WG-LC-0476 00 KAIG3-RFI-WG-LC-0476-00
KAIG3-RFI-WG-LC-0475 00 KAIG3-RFI-WG-LC-0475-00
KAIG3-RFI-SW-E-0399 00 KAIG3-RFI-SW-E-0399-00
KAIG3-RFI-SW-E-0398 00 KAIG3-RFI-SW-E-0398-00
KAIG3-RFI-TG-S-6536 00 KAIG3-RFI-TG-S-6536-00
KAIG3-RFI-TG-S-6534 00 KAIG3-RFI-TG-S-6534-00
KAIG3-RFI-TG-SU-2228 00 KAIG3-RFI-TG-SU-2228-00
KAIG3-RFI-SG-C-3806 00 KAIG3-RFI-SG-C-3806-00
KAIG3-RFI-CO-C-3798 00 KAIG3-RFI-CO-C-3798-00
KAIG3-RFI-MC-C-3796 00 KAIG3-RFI-MC-C-3796-00
KAIG3-RFI-CO-C-3797 00 KAIG3-RFI-CO-C-3797-00
KAIG3-RFI-LM-SU-2236 00 KAIG3-RFI-LM-SU-2236-00
KAIG3-RFI-MC-S-6450 00 KAIG3-RFI-MC-S-6450-00
KAIG3-RFI-CO-S-6535 00 KAIG3-RFI-CO-S-6535-00
KAIG3-RFI-LM-S-6414 00 KAIG3-RFI-LM-S-6414-00
KAIG3-RFI-CO-S-6490 00 KAIG3-RFI-CO-S-6490-00
KAIG3-RFI-CO-S-6516 00 KAIG3-RFI-CO-S-6516-00
KAIG3-RFI-CO-S-6417 00 KAIG3-RFI-CO-S-6417-00
KAIG3-RFI-CO-S-6418 00 KAIG3-RFI-CO-S-6418-00
KAIG3-RFI-MC-S-6208 00 KAIG3-RFI-MC-S-6208-00
KAIG3-RFI-MC-S-6209 00 KAIG3-RFI-MC-S-6209-00
KAIG3-RFI-MC-S-6210 00 KAIG3-RFI-MC-S-6210-00
KAIG3-RFI-WG-C-3787 00 KAIG3-RFI-WG-C-3787-00
KAIG3-RFI-TG-SS-0077 00 KAIG3-RFI-TG-SS-0077-00
KAIG3-RFI-TG-C-3786 00 KAIG3-RFI-TG-C-3786-00
KAIG3-RFI-TT-S-6533 00 KAIG3-RFI-TT-S-6533-00
KAIG3-RFI-TG-S-6532 00 KAIG3-RFI-TG-S-6532-00
KAIG3-RFI-TG-S-6507 00 KAIG3-RFI-TG-S-6507-00
KAIG3-RFI-PT-A-0755 00 KAIG3-RFI-PT-A-0755-00
KAIG3-RFI-SW-C-3789 00 KAIG3-RFI-SW-C-3789-00
KAIG3-RFI-PT-A-0754 00 KAIG3-RFI-PT-A-0754-00
KAIG3-RFI-SW-C-3788 00 KAIG3-RFI-SW-C-3788-00
KAIG3-RFI-SW-C-3785 00 KAIG3-RFI-SW-C-3785-00
KAIG3-RFI-SW-C-3784 00 KAIG3-RFI-SW-C-3784-00
KAIG3-RFI-SW-C-3783 00 KAIG3-RFI-SW-C-3783-00
KAIG3-RFI-SW-C-3781 00 KAIG3-RFI-SW-C-3781-00
KAIG3-RFI-SW-C-3780 00 KAIG3-RFI-SW-C-3780-00
KAIG3-RFI-SW-C-3779 00 KAIG3-RFI-SW-C-3779-00
KAIG3-RFI-SW-C-3778 00 KAIG3-RFI-SW-C-3778-00
KAIG3-RFI-SW-C-3777 00 KAIG3-RFI-SW-C-3777-00
KAIG3-RFI-SW-C-3776 00 KAIG3-RFI-SW-C-3776-00
KAIG3-RFI-SW-C-3772 00 KAIG3-RFI-SW-C-3772-00
KAIG3-RFI-SW-C-3771 00 KAIG3-RFI-SW-C-3771-00
KAIG3-RFI-SW-C-3770 00 KAIG3-RFI-SW-C-3770-00
KAIG3-RFI-SW-C-3769 00 KAIG3-RFI-SW-C-3769-00
KAIG3-RFI-SW-C-3768 00 KAIG3-RFI-SW-C-3768-00
KAIG3-RFI-SW-C-3767 00 KAIG3-RFI-SW-C-3767-00
KAIG3-RFI-SW-C-2486 01 KAIG3-RFI-SW-C-2486-01
KAIG3-RFI-CO-SS-0074 00 KAIG3-RFI-CO-SS-0074-00
KAIG3-RFI-CO-SU-2235 00 KAIG3-RFI-CO-SU-2235-00
KAIG3-RFI-CO-C-3775 00 KAIG3-RFI-CO-C-3775-00
KAIG3-RFI-CO-C-3774 00 KAIG3-RFI-CO-C-3774-00
KAIG3-RFI-MC-C-3773 00 KAIG3-RFI-MC-C-3773-00
KAIG3-RFI-PC-LC-0474 00 KAIG3-RFI-PC-LC-0474-00
KAIG3-RFI-CO-SU-2233 00 KAIG3-RFI-CO-SU-2233-00
KAIG3-RFI-CO-SU-2234 00 KAIG3-RFI-CO-SU-2234-00
KAIG3-RFI-PC-LC-0473 00 KAIG3-RFI-PC-LC-0473-00
KAIG3-RFI-CO-S-6528 00 KAIG3-RFI-CO-S-6528-00
KAIG3-RFI-CO-S-6527 00 KAIG3-RFI-CO-S-6527-00
KAIG3-RFI-MC-S-6529 00 KAIG3-RFI-MC-S-6529-00
KAIG3-RFI-CO-S-6530 00 KAIG3-RFI-CO-S-6530-00
KAIG3-RFI-CO-S-6531 00 KAIG3-RFI-CO-S-6531-00
KAIG3-RFI-CO-S-6522 00 KAIG3-RFI-CO-S-6522-00
KAIG3-RFI-CO-S-6523 00 KAIG3-RFI-CO-S-6523-00
KAIG3-RFI-CO-S-6524 00 KAIG3-RFI-CO-S-6524-00
KAIG3-RFI-CO-S-6525 00 KAIG3-RFI-CO-S-6525-00
KAIG3-RFI-CO-S-6526 00 KAIG3-RFI-CO-S-6526-00
KAIG3-RFI-PC-LC-0472 00 KAIG3-RFI-PC-LC-0472-00
KAIG3-RFI-PC-LC-0471 00 KAIG3-RFI-PC-LC-0471-00
KAIG3-RFI-PC-LC-0470 00 KAIG3-RFI-PC-LC-0470-00
KAIG3-RFI-PT-A-0748 00 KAIG3-RFI-PT-A-0748-00
KAIG3-RFI-SW-C-3758 00 KAIG3-RFI-SW-C-3758-00
KAIG3-RFI-SW-C-3757 00 KAIG3-RFI-SW-C-3757-00
KAIG3-RFI-SW-C-3255 02 KAIG3-RFI-SW-C-3255-02
KAIG3-RFI-SW-C-3416-00 01 KAIG3-RFI-SW-C-3416-00-01
KAIG3-RFI-SW-C-3766 00 KAIG3-RFI-SW-C-3766-00
KAIG3-RFI-SW-C-3765 00 KAIG3-RFI-SW-C-3765-00
KAIG3-RFI-SW-C-3764 00 KAIG3-RFI-SW-C-3764-00
KAIG3-RFI-SW-C-3763 00 KAIG3-RFI-SW-C-3763-00
KAIG3-RFI-SW-C-3762 00 KAIG3-RFI-SW-C-3762-00
KAIG3-RFI-SW-C-3761 00 KAIG3-RFI-SW-C-3761-00
KAIG3-RFI-SW-C-3760 00 KAIG3-RFI-SW-C-3760-00
KAIG3-RFI-SW-C-3759 00 KAIG3-RFI-SW-C-3759-00
KAIG3-RFI-SW-C-3755 00 KAIG3-RFI-SW-C-3755-00
KAIG3-RFI-SW-C-3754 00 KAIG3-RFI-SW-C-3754-00
KAIG3-RFI-SW-C-3753 00 KAIG3-RFI-SW-C-3753-00
KAIG3-RFI-SW-C-3752 00 KAIG3-RFI-SW-C-3752-00
KAIG3-RFI-SW-C-3751 00 KAIG3-RFI-SW-C-3751-00
KAIG3-RFI-SW-C-3750 00 KAIG3-RFI-SW-C-3750-00
KAIG3-RFI-SW-C-3749 00 KAIG3-RFI-SW-C-3749-00
KAIG3-RFI-SW-C-3748 00 KAIG3-RFI-SW-C-3748-00
KAIG3-RFI-SW-C-3747 00 KAIG3-RFI-SW-C-3747-00
KAIG3-RFI-PC-E-0397 00 KAIG3-RFI-PC-E-0397-00
KAIG3-RFI-SW-C-3734 00 KAIG3-RFI-SW-C-3734-00
KAIG3-RFI-SW-C-3504 00 KAIG3-RFI-SW-C-3504-00
KAIG3-RFI-TG-S-6504 00 KAIG3-RFI-TG-S-6504-00
KAIG3-RFI-ZG-C-3756 00 KAIG3-RFI-ZG-C-3756-00
KAIG3-RFI-PC-E-0396 00 KAIG3-RFI-PC-E-0396-00
KAIG3-RFI-SW-C-2485 01 KAIG3-RFI-SW-C-2485-01
KAIG3-RFI-PC-E-0395 00 KAIG3-RFI-PC-E-0395-00
KAIG3-RFI-CO-C-3744 00 KAIG3-RFI-CO-C-3744-00
KAIG3-RFI-MC-C-3746 00 KAIG3-RFI-MC-C-3746-00
KAIG3-RFI-CO-C-3745 00 KAIG3-RFI-CO-C-3745-00
KAIG3-RFI-CO-S-6521 00 KAIG3-RFI-CO-S-6521-00
KAIG3-RFI-MC-S-6519 00 KAIG3-RFI-MC-S-6519-00
KAIG3-RFI-MC-S-6520 00 KAIG3-RFI-MC-S-6520-00
KAIG3-RFI-SW-C-3743 00 KAIG3-RFI-SW-C-3743-00
KAIG3-RFI-SW-C-3742 00 KAIG3-RFI-SW-C-3742-00
KAIG3-RFI-SW-C-3740 00 KAIG3-RFI-SW-C-3740-00
KAIG3-RFI-SW-C-3739 00 KAIG3-RFI-SW-C-3739-00
KAIG3-RFI-SW-C-3738 00 KAIG3-RFI-SW-C-3738-00
KAIG3-RFI-SW-C-3737 00 KAIG3-RFI-SW-C-3737-00
KAIG3-RFI-SW-C-3736 00 KAIG3-RFI-SW-C-3736-00
KAIG3-RFI-SW-C-3733 00 KAIG3-RFI-SW-C-3733-00
KAIG3-RFI-SW-C-3732 00 KAIG3-RFI-SW-C-3732-00
KAIG3-RFI-SW-C-3731 00 KAIG3-RFI-SW-C-3731-00
KAIG3-RFI-SW-C-3730 00 KAIG3-RFI-SW-C-3730-00
KAIG3-RFI-WG-LS-1219 00 KAIG3-RFI-WG-LS-1219-00
KAIG3-RFI-SW-C-3376 01 KAIG3-RFI-SW-C-3376-01
KAIG3-RFI-WG-LS-1218 00 KAIG3-RFI-WG-LS-1218-00
KAIG3-RFI-SW-C-3365 01 KAIG3-RFI-SW-C-3365-01
KAIG3-RFI-SW-C-3364 01 KAIG3-RFI-SW-C-3364-01
KAIG3-RFI-WG-LS-1217 00 KAIG3-RFI-WG-LS-1217-00
KAIG3-RFI-SW-C-3363 01 KAIG3-RFI-SW-C-3363-01
KAIG3-RFI-SW-C-3299 01 KAIG3-RFI-SW-C-3299-01
KAIG3-RFI-WG-C-3729 00 KAIG3-RFI-WG-C-3729-00
KAIG3-RFI-ZG-C-3139 01 KAIG3-RFI-ZG-C-3139-01
KAIG3-RFI-SW-C-3298 01 KAIG3-RFI-SW-C-3298-01
KAIG3-RFI-SW-C-3294 01 KAIG3-RFI-SW-C-3294-01
KAIG3-RFI-AG-S-6503 00 KAIG3-RFI-AG-S-6503-00
KAIG3-RFI-ZG-C-3140 01 KAIG3-RFI-ZG-C-3140-01
KAIG3-RFI-PG-C-3728 00 KAIG3-RFI-PG-C-3728-00
KAIG3-RFI-WG-LS-1216 00 KAIG3-RFI-WG-LS-1216-00
KAIG3-RFI-SW-C-3279 01 KAIG3-RFI-SW-C-3279-01
KAIG3-RFI-WG-LS-1215 00 KAIG3-RFI-WG-LS-1215-00
KAIG3-RFI-SW-C-3234 01 KAIG3-RFI-SW-C-3234-01
KAIG3-RFI-WG-LS-1214 00 KAIG3-RFI-WG-LS-1214-00
KAIG3-RFI-SW-C-3041 02 KAIG3-RFI-SW-C-3041-02
KAIG3-RFI-CO-C-3727 00 KAIG3-RFI-CO-C-3727-00
KAIG3-RFI-CO-C-3741 00 KAIG3-RFI-CO-C-3741-00
KAIG3-RFI-CO-C-3725 00 KAIG3-RFI-CO-C-3725-00
KAIG3-RFI-MC-C-3724 00 KAIG3-RFI-MC-C-3724-00
KAIG3-RFI-CO-C-3726 00 KAIG3-RFI-CO-C-3726-00
KAIG3-RFI-CO-SS-0072 00 KAIG3-RFI-CO-SS-0072-00
KAIG3-RFI-CO-SS-0067 00 KAIG3-RFI-CO-SS-0067-00
KAIG3-RFI-CO-SU-2231 00 KAIG3-RFI-CO-SU-2231-00
KAIG3-RFI-CO-SU-2232 00 KAIG3-RFI-CO-SU-2232-00
KAIG3-RFI-CO-SU-2230 00 KAIG3-RFI-CO-SU-2230-00
KAIG3-RFI-CO-SU-2205 01 KAIG3-RFI-CO-SU-2205-01
KAIG3-RFI-CO-S-6514 00 KAIG3-RFI-CO-S-6514-00
KAIG3-RFI-CO-S-6515 00 KAIG3-RFI-CO-S-6515-00
KAIG3-RFI-CO-S-6517 00 KAIG3-RFI-CO-S-6517-00
KAIG3-RFI-CO-S-6518 00 KAIG3-RFI-CO-S-6518-00
KAIG3-RFI-MC-S-6508 00 KAIG3-RFI-MC-S-6508-00
KAIG3-RFI-MC-S-6509 00 KAIG3-RFI-MC-S-6509-00
KAIG3-RFI-LM-S-6510 00 KAIG3-RFI-LM-S-6510-00
KAIG3-RFI-CO-S-6511 00 KAIG3-RFI-CO-S-6511-00
KAIG3-RFI-CO-S-6512 00 KAIG3-RFI-CO-S-6512-00
KAIG3-RFI-CO-S-6513 00 KAIG3-RFI-CO-S-6513-00
KAIG3-RFI-SW-C-3716 00 KAIG3-RFI-SW-C-3716-00
KAIG3-RFI-SW-C-3715 00 KAIG3-RFI-SW-C-3715-00
KAIG3-RFI-SW-C-3343 01 KAIG3-RFI-SW-C-3343-01
KAIG3-RFI-SW-C-3333 01 KAIG3-RFI-SW-C-3333-01
KAIG3-RFI-SW-C-3332 01 KAIG3-RFI-SW-C-3332-01
KAIG3-RFI-SW-LS-1158 01 KAIG3-RFI-SW-LS-1158-01
KAIG3-RFI-SW-LS-1151 01 KAIG3-RFI-SW-LS-1151-01
KAIG3-RFI-SW-LS-1150 01 KAIG3-RFI-SW-LS-1150-01
KAIG3-RFI-SW-LS-1149 01 KAIG3-RFI-SW-LS-1149-01
KAIG3-RFI-SW-LS-1148 01 KAIG3-RFI-SW-LS-1148-01
KAIG3-RFI-SW-LS-1147 01 KAIG3-RFI-SW-LS-1147-01
KAIG3-RFI-SW-LS-1146 01 KAIG3-RFI-SW-LS-1146-01
KAIG3-RFI-SW-LS-1145 01 KAIG3-RFI-SW-LS-1145-01
KAIG3-RFI-SW-C-3723 00 KAIG3-RFI-SW-C-3723-00
KAIG3-RFI-SW-C-3722 00 KAIG3-RFI-SW-C-3722-00
KAIG3-RFI-SW-C-3721 00 KAIG3-RFI-SW-C-3721-00
KAIG3-RFI-SW-C-3717 00 KAIG3-RFI-SW-C-3717-00
KAIG3-RFI-MC-C-3706 00 KAIG3-RFI-MC-C-3706-00
KAIG3-RFI-MC-C-3699 00 KAIG3-RFI-MC-C-3699-00
KAIG3-RFI-MC-C-3697 00 KAIG3-RFI-MC-C-3697-00
KAIG3-RFI-MC-C-3698 00 KAIG3-RFI-MC-C-3698-00
KAIG3-RFI-SW-C-3708 00 KAIG3-RFI-SW-C-3708-00
KAIG3-RFI-CO-C-3653 00 KAIG3-RFI-CO-C-3653-00
KAIG3-RFI-SW-C-3707 00 KAIG3-RFI-SW-C-3707-00
KAIG3-RFI-CO-C-3668 00 KAIG3-RFI-CO-C-3668-00
KAIG3-RFI-SW-C-3704 00 KAIG3-RFI-SW-C-3704-00
KAIG3-RFI-MC-C-3686 00 KAIG3-RFI-MC-C-3686-00
KAIG3-RFI-SW-C-3703 00 KAIG3-RFI-SW-C-3703-00
KAIG3-RFI-SW-C-3702 00 KAIG3-RFI-SW-C-3702-00
KAIG3-RFI-MC-C-3669 00 KAIG3-RFI-MC-C-3669-00
KAIG3-RFI-SW-C-3701 00 KAIG3-RFI-SW-C-3701-00
KAIG3-RFI-SW-C-3700 00 KAIG3-RFI-SW-C-3700-00
KAIG3-RFI-CO-C-3670 00 KAIG3-RFI-CO-C-3670-00
KAIG3-RFI-SW-C-3690 00 KAIG3-RFI-SW-C-3690-00
KAIG3-RFI-SW-C-3689 00 KAIG3-RFI-SW-C-3689-00
KAIG3-RFI-SW-C-3688 00 KAIG3-RFI-SW-C-3688-00
KAIG3-RFI-SW-C-3687 00 KAIG3-RFI-SW-C-3687-00
KAIG3-RFI-SW-C-3443 01 KAIG3-RFI-SW-C-3443-01
KAIG3-RFI-SW-C-3442 01 KAIG3-RFI-SW-C-3442-01
KAIG3-RFI-SW-C-3441 01 KAIG3-RFI-SW-C-3441-01
KAIG3-RFI-SW-C-3440 01 KAIG3-RFI-SW-C-3440-01
KAIG3-RFI-SW-C-3406 01 KAIG3-RFI-SW-C-3406-01
KAIG3-RFI-SW-C-3344 01 KAIG3-RFI-SW-C-3344-01
KAIG3-RFI-GN-A-0713 00 KAIG3-RFI-GN-A-0713-00
KAIG3-RFI-WG-P-0197 00 KAIG3-RFI-WG-P-0197-00
KAIG3-RFI-ZG-C-3720 00 KAIG3-RFI-ZG-C-3720-00
KAIG3-RFI-DG-C-3719 00 KAIG3-RFI-DG-C-3719-00
KAIG3-RFI-ZG-C-3696 00 KAIG3-RFI-ZG-C-3696-00
KAIG3-RFI-MB-C-3695 00 KAIG3-RFI-MB-C-3695-00
KAIG3-RFI-PG-C-3694 00 KAIG3-RFI-PG-C-3694-00
KAIG3-RFI-PG-C-3693 00 KAIG3-RFI-PG-C-3693-00
KAIG3-RFI-SG-LS-1213 00 KAIG3-RFI-SG-LS-1213-00
KAIG3-RFI-PG-LS-1212 00 KAIG3-RFI-PG-LS-1212-00
KAIG3-RFI-PG-LS-1211 00 KAIG3-RFI-PG-LS-1211-00
KAIG3-RFI-TG-C-3692 00 KAIG3-RFI-TG-C-3692-00
KAIG3-RFI-TG-S-6502 00 KAIG3-RFI-TG-S-6502-00
KAIG3-RFI-DG-C-3691 00 KAIG3-RFI-DG-C-3691-00
KAIG3-RFI-CO-SS-0070 00 KAIG3-RFI-CO-SS-0070-00
KAIG3-RFI-AG-SS-0071 00 KAIG3-RFI-AG-SS-0071-00
KAIG3-RFI-AG-SS-0069 00 KAIG3-RFI-AG-SS-0069-00
KAIG3-RFI-CO-SS-0068 00 KAIG3-RFI-CO-SS-0068-00
KAIG3-RFI-CO-SU-2226 00 KAIG3-RFI-CO-SU-2226-00
KAIG3-RFI-LM-SU-2229 00 KAIG3-RFI-LM-SU-2229-00
KAIG3-RFI-CO-SU-2227 00 KAIG3-RFI-CO-SU-2227-00
KAIG3-RFI-CO-SU-2225 00 KAIG3-RFI-CO-SU-2225-00
KAIG3-RFI-CO-SU-2221 00 KAIG3-RFI-CO-SU-2221-00
KAIG3-RFI-CO-SU-2222 00 KAIG3-RFI-CO-SU-2222-00
KAIG3-RFI-CO-SU-2223 00 KAIG3-RFI-CO-SU-2223-00
KAIG3-RFI-CO-S-6505 00 KAIG3-RFI-CO-S-6505-00
KAIG3-RFI-CO-S-6506 00 KAIG3-RFI-CO-S-6506-00
KAIG3-RFI-CO-S-6501 00 KAIG3-RFI-CO-S-6501-00
KAIG3-RFI-CO-S-6500 00 KAIG3-RFI-CO-S-6500-00
KAIG3-RFI-CO-S-6495 00 KAIG3-RFI-CO-S-6495-00
KAIG3-RFI-CO-S-6497 00 KAIG3-RFI-CO-S-6497-00
KAIG3-RFI-CO-S-6498 00 KAIG3-RFI-CO-S-6498-00
KAIG3-RFI-CO-S-6499 00 KAIG3-RFI-CO-S-6499-00
KAIG3-RFI-MC-S-6452 00 KAIG3-RFI-MC-S-6452-00
KAIG3-RFI-CO-S-6493 00 KAIG3-RFI-CO-S-6493-00
KAIG3-RFI-CO-S-6494 00 KAIG3-RFI-CO-S-6494-00
KAIG3-RFI-CO-S-6481 00 KAIG3-RFI-CO-S-6481-00
KAIG3-RFI-TG-E-0394 00 KAIG3-RFI-TG-E-0394-00
KAIG3-RFI-TG-LC-0469 00 KAIG3-RFI-TG-LC-0469-00
KAIG3-RFI-CO-S-6482 00 KAIG3-RFI-CO-S-6482-00
KAIG3-RFI-MC-S-6484 00 KAIG3-RFI-MC-S-6484-00
KAIG3-RFI-CO-S-6485 00 KAIG3-RFI-CO-S-6485-00
KAIG3-RFI-CO-S-6486 00 KAIG3-RFI-CO-S-6486-00
KAIG3-RFI-LM-S-6487 00 KAIG3-RFI-LM-S-6487-00
KAIG3-RFI-CO-S-6488 00 KAIG3-RFI-CO-S-6488-00
KAIG3-RFI-CO-S-6489 00 KAIG3-RFI-CO-S-6489-00
KAIG3-RFI-PC-E-0393 00 KAIG3-RFI-PC-E-0393-00
KAIG3-RFI-PC-E-0392 00 KAIG3-RFI-PC-E-0392-00
KAIG3-RFI-CO-E-0391 00 KAIG3-RFI-CO-E-0391-00
KAIG3-RFI-PC-E-0390 00 KAIG3-RFI-PC-E-0390-00
KAIG3-RFI-PC-LC-0468 00 KAIG3-RFI-PC-LC-0468-00
KAIG3-RFI-PC-LC-0467 00 KAIG3-RFI-PC-LC-0467-00
KAIG3-RFI-PC-LC-0466 00 KAIG3-RFI-PC-LC-0466-00
KAIG3-RFI-PC-LC-0463 00 KAIG3-RFI-PC-LC-0463-00
KAIG3-RFI-PC-LC-0462 00 KAIG3-RFI-PC-LC-0462-00
KAIG3-RFI-SW-C-3685 00 KAIG3-RFI-SW-C-3685-00
KAIG3-RFI-SW-C-3684 00 KAIG3-RFI-SW-C-3684-00
KAIG3-RFI-SW-C-3683 00 KAIG3-RFI-SW-C-3683-00
KAIG3-RFI-SW-C-3682 00 KAIG3-RFI-SW-C-3682-00
KAIG3-RFI-SW-C-3681 00 KAIG3-RFI-SW-C-3681-00
KAIG3-RFI-SW-C-3680 00 KAIG3-RFI-SW-C-3680-00
KAIG3-RFI-SW-C-3679 00 KAIG3-RFI-SW-C-3679-00
KAIG3-RFI-SW-C-3678 00 KAIG3-RFI-SW-C-3678-00
KAIG3-RFI-SW-C-3677 00 KAIG3-RFI-SW-C-3677-00
KAIG3-RFI-SW-C-3676 00 KAIG3-RFI-SW-C-3676-00
KAIG3-RFI-SW-C-3675 00 KAIG3-RFI-SW-C-3675-00
KAIG3-RFI-SW-C-3674 00 KAIG3-RFI-SW-C-3674-00
KAIG3-RFI-SW-C-3673 00 KAIG3-RFI-SW-C-3673-00
KAIG3-RFI-SW-C-3672 00 KAIG3-RFI-SW-C-3672-00
KAIG3-RFI-SW-C-3671 00 KAIG3-RFI-SW-C-3671-00
KAIG3-RFI-SW-C-3665 00 KAIG3-RFI-SW-C-3665-00
KAIG3-RFI-SW-C-3664 00 KAIG3-RFI-SW-C-3664-00
KAIG3-RFI-SW-C-3663 00 KAIG3-RFI-SW-C-3663-00
KAIG3-RFI-SW-C-3662 00 KAIG3-RFI-SW-C-3662-00
KAIG3-RFI-SW-C-3661 00 KAIG3-RFI-SW-C-3661-00
KAIG3-RFI-SW-C-3660 00 KAIG3-RFI-SW-C-3660-00
KAIG3-RFI-SW-C-3659 00 KAIG3-RFI-SW-C-3659-00
KAIG3-RFI-SW-C-3658 00 KAIG3-RFI-SW-C-3658-00
KAIG3-RFI-SW-C-3657 00 KAIG3-RFI-SW-C-3657-00
KAIG3-RFI-SW-C-3656 00 KAIG3-RFI-SW-C-3656-00
KAIG3-RFI-SW-C-3655 00 KAIG3-RFI-SW-C-3655-00
KAIG3-RFI-SW-C-3654 00 KAIG3-RFI-SW-C-3654-00
KAIG3-RFI-PA-SS-0061 01 KAIG3-RFI-PA-SS-0061-01
KAIG3-RFI-WG-LS-1210 00 KAIG3-RFI-WG-LS-1210-00
KAIG3-RFI-WG-LS-1209 00 KAIG3-RFI-WG-LS-1209-00
KAIG3-RFI-WG-C-3667 00 KAIG3-RFI-WG-C-3667-00
KAIG3-RFI-TG-S-6492 00 KAIG3-RFI-TG-S-6492-00
KAIG3-RFI-TG-SU-2224 00 KAIG3-RFI-TG-SU-2224-00
KAIG3-RFI-TG-S-6491 00 KAIG3-RFI-TG-S-6491-00
KAIG3-RFI-WG-C-3666 00 KAIG3-RFI-WG-C-3666-00
KAIG3-RFI-ZG-S-6341 01 KAIG3-RFI-ZG-S-6341-01
KAIG3-RFI-ZG-C-3407 01 KAIG3-RFI-ZG-C-3407-01
KAIG3-RFI-WG-LS-1208 00 KAIG3-RFI-WG-LS-1208-00
KAIG3-RFI-WG-LS-1207 00 KAIG3-RFI-WG-LS-1207-00
KAIG3-RFI-WG-LS-1206 00 KAIG3-RFI-WG-LS-1206-00
KAIG3-RFI-SR-LC-0465 00 KAIG3-RFI-SR-LC-0465-00
KAIG3-RFI-ZG-C-3646 00 KAIG3-RFI-ZG-C-3646-00
KAIG3-RFI-SR-LC-0464 00 KAIG3-RFI-SR-LC-0464-00
KAIG3-RFI-SW-LS-1149 00 KAIG3-RFI-SW-LS-1149-00
KAIG3-RFI-SW-LC-0461 00 KAIG3-RFI-SW-LC-0461-00
KAIG3-RFI-SW-LC-0460 00 KAIG3-RFI-SW-LC-0460-00
KAIG3-RFI-SW-C-3652 00 KAIG3-RFI-SW-C-3652-00
KAIG3-RFI-SW-C-3651 00 KAIG3-RFI-SW-C-3651-00
KAIG3-RFI-SW-C-3650 00 KAIG3-RFI-SW-C-3650-00
KAIG3-RFI-SW-C-3649 00 KAIG3-RFI-SW-C-3649-00
KAIG3-RFI-SW-C-3648 00 KAIG3-RFI-SW-C-3648-00
KAIG3-RFI-SW-C-3647 00 KAIG3-RFI-SW-C-3647-00
KAIG3-RFI-SW-C-3640 00 KAIG3-RFI-SW-C-3640-00
KAIG3-RFI-SW-C-3639 00 KAIG3-RFI-SW-C-3639-00
KAIG3-RFI-PG-C-3645 00 KAIG3-RFI-PG-C-3645-00
KAIG3-RFI-PG-C-3644 00 KAIG3-RFI-PG-C-3644-00
KAIG3-RFI-SG-C-3643 00 KAIG3-RFI-SG-C-3643-00
KAIG3-RFI-SW-C-3638 00 KAIG3-RFI-SW-C-3638-00
KAIG3-RFI-SW-C-3637 00 KAIG3-RFI-SW-C-3637-00
KAIG3-RFI-SW-C-3636 00 KAIG3-RFI-SW-C-3636-00
KAIG3-RFI-SW-C-3635 00 KAIG3-RFI-SW-C-3635-00
KAIG3-RFI-SW-C-3623 00 KAIG3-RFI-SW-C-3623-00
KAIG3-RFI-SW-C-3556 00 KAIG3-RFI-SW-C-3556-00
KAIG3-RFI-SG-C-3642 00 KAIG3-RFI-SG-C-3642-00
KAIG3-RFI-PG-C-3641 00 KAIG3-RFI-PG-C-3641-00
KAIG3-RFI-TB-SU-2220 00 KAIG3-RFI-TB-SU-2220-00
KAIG3-RFI-TB-S-6480 00 KAIG3-RFI-TB-S-6480-00
KAIG3-RFI-TB-S-6479 00 KAIG3-RFI-TB-S-6479-00
KAIG3-RFI-CO-SU-2217 00 KAIG3-RFI-CO-SU-2217-00
KAIG3-RFI-CO-SU-2218 00 KAIG3-RFI-CO-SU-2218-00
KAIG3-RFI-CO-SU-2219 00 KAIG3-RFI-CO-SU-2219-00
KAIG3-RFI-CO-SS-0065 00 KAIG3-RFI-CO-SS-0065-00
KAIG3-RFI-CO-S-6472 00 KAIG3-RFI-CO-S-6472-00
KAIG3-RFI-CO-S-6473 00 KAIG3-RFI-CO-S-6473-00
KAIG3-RFI-CO-S-6474 00 KAIG3-RFI-CO-S-6474-00
KAIG3-RFI-CO-S-6475 00 KAIG3-RFI-CO-S-6475-00
KAIG3-RFI-CO-S-6476 00 KAIG3-RFI-CO-S-6476-00
KAIG3-RFI-CO-S-6477 00 KAIG3-RFI-CO-S-6477-00
KAIG3-RFI-CO-S-6478 00 KAIG3-RFI-CO-S-6478-00
KAIG3-RFI-CO-S-6435 00 KAIG3-RFI-CO-S-6435-00
KAIG3-RFI-CO-S-6438 00 KAIG3-RFI-CO-S-6438-00
KAIG3-RFI-CO-S-6397 00 KAIG3-RFI-CO-S-6397-00
KAIG3-RFI-CO-S-6390 00 KAIG3-RFI-CO-S-6390-00
KAIG3-RFI-WG-LS-1205 00 KAIG3-RFI-WG-LS-1205-00
KAIG3-RFI-WG-LS-1204 00 KAIG3-RFI-WG-LS-1204-00
KAIG3-RFI-WG-LS-1203 00 KAIG3-RFI-WG-LS-1203-00
KAIG3-RFI-PG-C-3392 01 KAIG3-RFI-PG-C-3392-01
KAIG3-RFI-TG-S-6468 00 KAIG3-RFI-TG-S-6468-00
KAIG3-RFI-TG-S-6467 00 KAIG3-RFI-TG-S-6467-00
KAIG3-RFI-ZG-C-3612 00 KAIG3-RFI-ZG-C-3612-00
KAIG3-RFI-WG-LS-1120 01 KAIG3-RFI-WG-LS-1120-01
KAIG3-RFI-PC-E-0389 00 KAIG3-RFI-PC-E-0389-00
KAIG3-RFI-PC-E-0388 00 KAIG3-RFI-PC-E-0388-00
KAIG3-RFI-WG-LS-1202 00 KAIG3-RFI-WG-LS-1202-00
KAIG3-RFI-WG-LS-1201 00 KAIG3-RFI-WG-LS-1201-00
KAIG3-RFI-ZG-SU-2213 00 KAIG3-RFI-ZG-SU-2213-00
KAIG3-RFI-ZG-C-3610 00 KAIG3-RFI-ZG-C-3610-00
KAIG3-RFI-WG-A-0752 00 KAIG3-RFI-WG-A-0752-00
KAIG3-RFI-CO-C-3634 00 KAIG3-RFI-CO-C-3634-00
KAIG3-RFI-MC-C-3633 00 KAIG3-RFI-MC-C-3633-00
KAIG3-RFI-CO-C-3632 00 KAIG3-RFI-CO-C-3632-00
KAIG3-RFI-MC-C-3631 00 KAIG3-RFI-MC-C-3631-00
KAIG3-RFI-CO-SU-2216 00 KAIG3-RFI-CO-SU-2216-00
KAIG3-RFI-CO-S-6470 00 KAIG3-RFI-CO-S-6470-00
KAIG3-RFI-SW-C-3630 00 KAIG3-RFI-SW-C-3630-00
KAIG3-RFI-SW-C-3629 00 KAIG3-RFI-SW-C-3629-00
KAIG3-RFI-CO-S-6471 00 KAIG3-RFI-CO-S-6471-00
KAIG3-RFI-SW-C-3628 00 KAIG3-RFI-SW-C-3628-00
KAIG3-RFI-SW-C-3627 00 KAIG3-RFI-SW-C-3627-00
KAIG3-RFI-CO-S-6464 00 KAIG3-RFI-CO-S-6464-00
KAIG3-RFI-SW-C-3626 00 KAIG3-RFI-SW-C-3626-00
KAIG3-RFI-SA-S-6459 00 KAIG3-RFI-SA-S-6459-00
KAIG3-RFI-SA-S-6460 00 KAIG3-RFI-SA-S-6460-00
KAIG3-RFI-SW-C-3625 00 KAIG3-RFI-SW-C-3625-00
KAIG3-RFI-LM-S-6461 00 KAIG3-RFI-LM-S-6461-00
KAIG3-RFI-SW-C-3624 00 KAIG3-RFI-SW-C-3624-00
KAIG3-RFI-SW-C-3622 00 KAIG3-RFI-SW-C-3622-00
KAIG3-RFI-SW-C-3621 00 KAIG3-RFI-SW-C-3621-00
KAIG3-RFI-CO-S-6413 00 KAIG3-RFI-CO-S-6413-00
KAIG3-RFI-SW-C-3620 00 KAIG3-RFI-SW-C-3620-00
KAIG3-RFI-SW-C-3619 00 KAIG3-RFI-SW-C-3619-00
KAIG3-RFI-CO-S-6416 00 KAIG3-RFI-CO-S-6416-00
KAIG3-RFI-CO-S-6465 00 KAIG3-RFI-CO-S-6465-00
KAIG3-RFI-SW-C-3616 00 KAIG3-RFI-SW-C-3616-00
KAIG3-RFI-CO-S-6321 01 KAIG3-RFI-CO-S-6321-01
KAIG3-RFI-CO-S-6332 01 KAIG3-RFI-CO-S-6332-01
KAIG3-RFI-CO-S-6331 01 KAIG3-RFI-CO-S-6331-01
KAIG3-RFI-LM-S-6466 00 KAIG3-RFI-LM-S-6466-00
KAIG3-RFI-AG-SS-0064 00 KAIG3-RFI-AG-SS-0064-00
KAIG3-RFI-PT-A-0751 00 KAIG3-RFI-PT-A-0751-00
KAIG3-RFI-PT-A-0750 00 KAIG3-RFI-PT-A-0750-00
KAIG3-RFI-PT-A-0749 00 KAIG3-RFI-PT-A-0749-00
KAIG3-RFI-TG-S-6458 00 KAIG3-RFI-TG-S-6458-00
KAIG3-RFI-TG-S-6457 00 KAIG3-RFI-TG-S-6457-00
KAIG3-RFI-SG-C-3609 00 KAIG3-RFI-SG-C-3609-00
KAIG3-RFI-SG-C-3608 00 KAIG3-RFI-SG-C-3608-00
KAIG3-RFI-WG-C-3607 00 KAIG3-RFI-WG-C-3607-00
KAIG3-RFI-WG-S-6456 00 KAIG3-RFI-WG-S-6456-00
KAIG3-RFI-WG-C-3606 00 KAIG3-RFI-WG-C-3606-00
KAIG3-RFI-DG-C-3605 00 KAIG3-RFI-DG-C-3605-00
KAIG3-RFI-DG-SU-2212 00 KAIG3-RFI-DG-SU-2212-00
KAIG3-RFI-SW-C-3618 00 KAIG3-RFI-SW-C-3618-00
KAIG3-RFI-SW-C-3617 00 KAIG3-RFI-SW-C-3617-00
KAIG3-RFI-SW-P-0196 00 KAIG3-RFI-SW-P-0196-00
KAIG3-RFI-CO-SU-2214 00 KAIG3-RFI-CO-SU-2214-00
KAIG3-RFI-CO-SU-2210 00 KAIG3-RFI-CO-SU-2210-00
KAIG3-RFI-MC-SU-2211 00 KAIG3-RFI-MC-SU-2211-00
KAIG3-RFI-CO-S-6411 00 KAIG3-RFI-CO-S-6411-00
KAIG3-RFI-CO-S-6427 00 KAIG3-RFI-CO-S-6427-00
KAIG3-RFI-MC-S-6423 00 KAIG3-RFI-MC-S-6423-00
KAIG3-RFI-MC-S-6424 00 KAIG3-RFI-MC-S-6424-00
KAIG3-RFI-CO-S-6462 00 KAIG3-RFI-CO-S-6462-00
KAIG3-RFI-SW-C-3615 00 KAIG3-RFI-SW-C-3615-00
KAIG3-RFI-CO-S-6463 00 KAIG3-RFI-CO-S-6463-00
KAIG3-RFI-SW-C-3614 00 KAIG3-RFI-SW-C-3614-00
KAIG3-RFI-SW-C-3613 00 KAIG3-RFI-SW-C-3613-00
KAIG3-RFI-SW-C-3600 00 KAIG3-RFI-SW-C-3600-00
KAIG3-RFI-SW-C-3599 00 KAIG3-RFI-SW-C-3599-00
KAIG3-RFI-SW-C-3598 00 KAIG3-RFI-SW-C-3598-00
KAIG3-RFI-CO-S-6410 00 KAIG3-RFI-CO-S-6410-00
KAIG3-RFI-SW-C-3597 00 KAIG3-RFI-SW-C-3597-00
KAIG3-RFI-SW-C-3596 00 KAIG3-RFI-SW-C-3596-00
KAIG3-RFI-SW-C-3595 00 KAIG3-RFI-SW-C-3595-00
KAIG3-RFI-SW-C-3594 00 KAIG3-RFI-SW-C-3594-00
KAIG3-RFI-SW-C-3593 00 KAIG3-RFI-SW-C-3593-00
KAIG3-RFI-SW-C-3592 00 KAIG3-RFI-SW-C-3592-00
KAIG3-RFI-SW-C-3591 00 KAIG3-RFI-SW-C-3591-00
KAIG3-RFI-CO-S-6444 00 KAIG3-RFI-CO-S-6444-00
KAIG3-RFI-SW-C-3590 00 KAIG3-RFI-SW-C-3590-00
KAIG3-RFI-CO-S-6445 00 KAIG3-RFI-CO-S-6445-00
KAIG3-RFI-SW-C-3589 00 KAIG3-RFI-SW-C-3589-00
KAIG3-RFI-MC-S-6453 00 KAIG3-RFI-MC-S-6453-00
KAIG3-RFI-SW-C-3588 00 KAIG3-RFI-SW-C-3588-00
KAIG3-RFI-SW-C-3587 00 KAIG3-RFI-SW-C-3587-00
KAIG3-RFI-MC-S-6454 00 KAIG3-RFI-MC-S-6454-00
KAIG3-RFI-SW-C-3514 01 KAIG3-RFI-SW-C-3514-01
KAIG3-RFI-CO-S-6455 00 KAIG3-RFI-CO-S-6455-00
KAIG3-RFI-MC-C-3603 00 KAIG3-RFI-MC-C-3603-00
KAIG3-RFI-MC-C-3601 00 KAIG3-RFI-MC-C-3601-00
KAIG3-RFI-CO-C-3602 00 KAIG3-RFI-CO-C-3602-00
KAIG3-RFI-CO-C-3604 00 KAIG3-RFI-CO-C-3604-00
KAIG3-RFI-MC-C-3561 00 KAIG3-RFI-MC-C-3561-00
KAIG3-RFI-MC-C-3564 00 KAIG3-RFI-MC-C-3564-00
KAIG3-RFI-CO-C-3536 00 KAIG3-RFI-CO-C-3536-00
KAIG3-RFI-MC-C-3571 00 KAIG3-RFI-MC-C-3571-00
KAIG3-RFI-PC-LC-0458 00 KAIG3-RFI-PC-LC-0458-00
KAIG3-RFI-CO-C-3562 00 KAIG3-RFI-CO-C-3562-00
KAIG3-RFI-MC-C-3563 00 KAIG3-RFI-MC-C-3563-00
KAIG3-RFI-SW-LC-0457 00 KAIG3-RFI-SW-LC-0457-00
KAIG3-RFI-SW-LC-0456 00 KAIG3-RFI-SW-LC-0456-00
KAIG3-RFI-WG-LS-1200 00 KAIG3-RFI-WG-LS-1200-00
KAIG3-RFI-WG-LS-1199 00 KAIG3-RFI-WG-LS-1199-00
KAIG3-RFI-WG-LS-1198 00 KAIG3-RFI-WG-LS-1198-00
KAIG3-RFI-ZG-S-6449 00 KAIG3-RFI-ZG-S-6449-00
KAIG3-RFI-PG-C-3540 00 KAIG3-RFI-PG-C-3540-00
KAIG3-RFI-PG-S-6448 00 KAIG3-RFI-PG-S-6448-00
KAIG3-RFI-TG-S-6447 00 KAIG3-RFI-TG-S-6447-00
KAIG3-RFI-TG-S-6446 00 KAIG3-RFI-TG-S-6446-00
KAIG3-RFI-WG-LS-1197 00 KAIG3-RFI-WG-LS-1197-00
KAIG3-RFI-WG-LS-1196 00 KAIG3-RFI-WG-LS-1196-00
KAIG3-RFI-LM-P-0192 00 KAIG3-RFI-LM-P-0192-00
KAIG3-RFI-LM-P-0193 00 KAIG3-RFI-LM-P-0193-00
KAIG3-RFI-SW-P-0194 00 KAIG3-RFI-SW-P-0194-00
KAIG3-RFI-SW-P-0195 00 KAIG3-RFI-SW-P-0195-00
KAIG3-RFI-SW-C-3568 00 KAIG3-RFI-SW-C-3568-00
KAIG3-RFI-SW-C-3601 00 KAIG3-RFI-SW-C-3601-00
KAIG3-RFI-CO-SU-2204 00 KAIG3-RFI-CO-SU-2204-00
KAIG3-RFI-CO-SU-2207 00 KAIG3-RFI-CO-SU-2207-00
KAIG3-RFI-MC-SU-2208 00 KAIG3-RFI-MC-SU-2208-00
KAIG3-RFI-CO-SU-2209 00 KAIG3-RFI-CO-SU-2209-00
KAIG3-RFI-CO-SU-2206 00 KAIG3-RFI-CO-SU-2206-00
KAIG3-RFI-CO-SU-2205 00 KAIG3-RFI-CO-SU-2205-00
KAIG3-RFI-CO-SS-0063 00 KAIG3-RFI-CO-SS-0063-00
KAIG3-RFI-CO-S-6437 00 KAIG3-RFI-CO-S-6437-00
KAIG3-RFI-CO-S-6439 00 KAIG3-RFI-CO-S-6439-00
KAIG3-RFI-CO-S-6440 00 KAIG3-RFI-CO-S-6440-00
KAIG3-RFI-CO-S-6442 00 KAIG3-RFI-CO-S-6442-00
KAIG3-RFI-CO-S-6443 00 KAIG3-RFI-CO-S-6443-00
KAIG3-RFI-CO-S-6436 00 KAIG3-RFI-CO-S-6436-00
KAIG3-RFI-CO-S-6441 00 KAIG3-RFI-CO-S-6441-00
KAIG3-RFI-CO-S-6451 00 KAIG3-RFI-CO-S-6451-00
KAIG3-RFI-CO-S-6425 00 KAIG3-RFI-CO-S-6425-00
KAIG3-RFI-CO-S-6426 00 KAIG3-RFI-CO-S-6426-00
KAIG3-RFI-CO-S-6412 00 KAIG3-RFI-CO-S-6412-00
KAIG3-RFI-CO-S-6431 00 KAIG3-RFI-CO-S-6431-00
KAIG3-RFI-CO-S-6432 00 KAIG3-RFI-CO-S-6432-00
KAIG3-RFI-CO-S-6428 00 KAIG3-RFI-CO-S-6428-00
KAIG3-RFI-CO-S-6429 00 KAIG3-RFI-CO-S-6429-00
KAIG3-RFI-CO-S-6430 00 KAIG3-RFI-CO-S-6430-00
KAIG3-RFI-LM-S-6434 00 KAIG3-RFI-LM-S-6434-00
KAIG3-RFI-SW-C-3586 00 KAIG3-RFI-SW-C-3586-00
KAIG3-RFI-SW-C-3585 00 KAIG3-RFI-SW-C-3585-00
KAIG3-RFI-SW-C-3584 00 KAIG3-RFI-SW-C-3584-00
KAIG3-RFI-SW-C-3583 00 KAIG3-RFI-SW-C-3583-00
KAIG3-RFI-SW-C-3582 00 KAIG3-RFI-SW-C-3582-00
KAIG3-RFI-SW-C-3581 00 KAIG3-RFI-SW-C-3581-00
KAIG3-RFI-SW-C-3580 00 KAIG3-RFI-SW-C-3580-00
KAIG3-RFI-SW-C-3579 00 KAIG3-RFI-SW-C-3579-00
KAIG3-RFI-SW-C-3578 00 KAIG3-RFI-SW-C-3578-00
KAIG3-RFI-SW-C-3577 00 KAIG3-RFI-SW-C-3577-00
KAIG3-RFI-SW-C-3576 00 KAIG3-RFI-SW-C-3576-00
KAIG3-RFI-SW-C-3575 00 KAIG3-RFI-SW-C-3575-00
KAIG3-RFI-SW-C-3574 00 KAIG3-RFI-SW-C-3574-00
KAIG3-RFI-SW-C-3573 00 KAIG3-RFI-SW-C-3573-00
KAIG3-RFI-SW-C-3572 00 KAIG3-RFI-SW-C-3572-00
KAIG3-RFI-SW-C-3570 00 KAIG3-RFI-SW-C-3570-00
KAIG3-RFI-SW-C-3569 00 KAIG3-RFI-SW-C-3569-00
KAIG3-RFI-SW-C-3567 00 KAIG3-RFI-SW-C-3567-00
KAIG3-RFI-SW-C-3566 00 KAIG3-RFI-SW-C-3566-00
KAIG3-RFI-SW-C-3565 00 KAIG3-RFI-SW-C-3565-00
KAIG3-RFI-SW-C-3560 00 KAIG3-RFI-SW-C-3560-00
KAIG3-RFI-SW-C-3559 00 KAIG3-RFI-SW-C-3559-00
KAIG3-RFI-SW-C-3558 00 KAIG3-RFI-SW-C-3558-00
KAIG3-RFI-SW-LC-0454 00 KAIG3-RFI-SW-LC-0454-00
KAIG3-RFI-SW-C-3557 00 KAIG3-RFI-SW-C-3557-00
KAIG3-RFI-SW-LC-0453 00 KAIG3-RFI-SW-LC-0453-00
KAIG3-RFI-PC-LC-0452 00 KAIG3-RFI-PC-LC-0452-00
KAIG3-RFI-SW-C-3555 00 KAIG3-RFI-SW-C-3555-00
KAIG3-RFI-SW-C-3321 01 KAIG3-RFI-SW-C-3321-01
KAIG3-RFI-WG-LS-1154 00 KAIG3-RFI-WG-LS-1154-00
KAIG3-RFI-AG-S-6422 00 KAIG3-RFI-AG-S-6422-00
KAIG3-RFI-WG-LS-1195 00 KAIG3-RFI-WG-LS-1195-00
KAIG3-RFI-SW-LS-1141 01 KAIG3-RFI-SW-LS-1141-01
KAIG3-RFI-SW-C-3554 00 KAIG3-RFI-SW-C-3554-00
KAIG3-RFI-SW-C-3553 00 KAIG3-RFI-SW-C-3553-00
KAIG3-RFI-SW-C-3552 00 KAIG3-RFI-SW-C-3552-00
KAIG3-RFI-SW-C-3551 00 KAIG3-RFI-SW-C-3551-00
KAIG3-RFI-SW-C-3550 00 KAIG3-RFI-SW-C-3550-00
KAIG3-RFI-SW-C-3549 00 KAIG3-RFI-SW-C-3549-00
KAIG3-RFI-SW-C-3548 00 KAIG3-RFI-SW-C-3548-00
KAIG3-RFI-SW-C-3547 00 KAIG3-RFI-SW-C-3547-00
KAIG3-RFI-SW-C-3546 00 KAIG3-RFI-SW-C-3546-00
KAIG3-RFI-SW-C-3545 00 KAIG3-RFI-SW-C-3545-00
KAIG3-RFI-SW-C-3544 00 KAIG3-RFI-SW-C-3544-00
KAIG3-RFI-SW-C-3543 00 KAIG3-RFI-SW-C-3543-00
KAIG3-RFI-SW-C-3542 00 KAIG3-RFI-SW-C-3542-00
KAIG3-RFI-SW-C-3541 00 KAIG3-RFI-SW-C-3541-00
KAIG3-RFI-SW-C-3537 00 KAIG3-RFI-SW-C-3537-00
KAIG3-RFI-WG-LS-1194 00 KAIG3-RFI-WG-LS-1194-00
KAIG3-RFI-WG-LS-1193 00 KAIG3-RFI-WG-LS-1193-00
KAIG3-RFI-MB-C-3539 00 KAIG3-RFI-MB-C-3539-00
KAIG3-RFI-WG-S-6421 00 KAIG3-RFI-WG-S-6421-00
KAIG3-RFI-SG-C-3538 00 KAIG3-RFI-SG-C-3538-00
KAIG3-RFI-TB-S-6420 00 KAIG3-RFI-TB-S-6420-00
KAIG3-RFI-TB-SU-2203 00 KAIG3-RFI-TB-SU-2203-00
KAIG3-RFI-TB-S-6419 00 KAIG3-RFI-TB-S-6419-00
KAIG3-RFI-WG-LS-1192 00 KAIG3-RFI-WG-LS-1192-00
KAIG3-RFI-WG-LS-1191 00 KAIG3-RFI-WG-LS-1191-00
KAIG3-RFI-WG-LS-1190 00 KAIG3-RFI-WG-LS-1190-00
KAIG3-RFI-WG-LS-1189 00 KAIG3-RFI-WG-LS-1189-00
KAIG3-RFI-WG-LS-1188 00 KAIG3-RFI-WG-LS-1188-00
KAIG3-RFI-WG-C-3518 00 KAIG3-RFI-WG-C-3518-00
KAIG3-RFI-CO-SU-2199 00 KAIG3-RFI-CO-SU-2199-00
KAIG3-RFI-CO-SS-0057 00 KAIG3-RFI-CO-SS-0057-00
KAIG3-RFI-CO-S-6389 00 KAIG3-RFI-CO-S-6389-00
KAIG3-RFI-PC-LC-0451 00 KAIG3-RFI-PC-LC-0451-00
KAIG3-RFI-PC-LC-0450 00 KAIG3-RFI-PC-LC-0450-00
KAIG3-RFI-PC-LC-0449 00 KAIG3-RFI-PC-LC-0449-00
KAIG3-RFI-PC-E-0387 00 KAIG3-RFI-PC-E-0387-00
KAIG3-RFI-PC-E-0386 00 KAIG3-RFI-PC-E-0386-00
KAIG3-RFI-CO-SS-0062 00 KAIG3-RFI-CO-SS-0062-00
KAIG3-RFI-SW-LS-1144 00 KAIG3-RFI-SW-LS-1144-00
KAIG3-RFI-LM-LC-0448 00 KAIG3-RFI-LM-LC-0448-00
KAIG3-RFI-SW-C-3535 00 KAIG3-RFI-SW-C-3535-00
KAIG3-RFI-SW-C-3534 00 KAIG3-RFI-SW-C-3534-00
KAIG3-RFI-SW-C-3533 00 KAIG3-RFI-SW-C-3533-00
KAIG3-RFI-SW-C-3532 00 KAIG3-RFI-SW-C-3532-00
KAIG3-RFI-SW-C-3531 00 KAIG3-RFI-SW-C-3531-00
KAIG3-RFI-SW-C-3530 00 KAIG3-RFI-SW-C-3530-00
KAIG3-RFI-SW-C-3526 00 KAIG3-RFI-SW-C-3526-00
KAIG3-RFI-SW-C-3525 00 KAIG3-RFI-SW-C-3525-00
KAIG3-RFI-SW-C-3524 00 KAIG3-RFI-SW-C-3524-00
KAIG3-RFI-SW-C-3523 00 KAIG3-RFI-SW-C-3523-00
KAIG3-RFI-SW-C-3522 00 KAIG3-RFI-SW-C-3522-00
KAIG3-RFI-SW-C-3521 00 KAIG3-RFI-SW-C-3521-00
KAIG3-RFI-SW-C-3520 00 KAIG3-RFI-SW-C-3520-00
KAIG3-RFI-SW-C-3519 00 KAIG3-RFI-SW-C-3519-00
KAIG3-RFI-SW-C-3515 00 KAIG3-RFI-SW-C-3515-00
KAIG3-RFI-SW-C-3514 00 KAIG3-RFI-SW-C-3514-00
KAIG3-RFI-SW-C-3513 00 KAIG3-RFI-SW-C-3513-00
KAIG3-RFI-SW-C-3512 00 KAIG3-RFI-SW-C-3512-00
KAIG3-RFI-SW-C-3511 00 KAIG3-RFI-SW-C-3511-00
KAIG3-RFI-SW-C-3510 00 KAIG3-RFI-SW-C-3510-00
KAIG3-RFI-SW-C-3509 00 KAIG3-RFI-SW-C-3509-00
KAIG3-RFI-SW-C-3508 00 KAIG3-RFI-SW-C-3508-00
KAIG3-RFI-SW-C-3507 00 KAIG3-RFI-SW-C-3507-00
KAIG3-RFI-SW-C-3506 00 KAIG3-RFI-SW-C-3506-00
KAIG3-RFI-SW-C-3499 00 KAIG3-RFI-SW-C-3499-00
KAIG3-RFI-PA-SS-0061 00 KAIG3-RFI-PA-SS-0061-00
KAIG3-RFI-SG-LS-1187 00 KAIG3-RFI-SG-LS-1187-00
KAIG3-RFI-ZG-S-6403 00 KAIG3-RFI-ZG-S-6403-00
KAIG3-RFI-SG-C-3517 00 KAIG3-RFI-SG-C-3517-00
KAIG3-RFI-MB-C-3516 00 KAIG3-RFI-MB-C-3516-00
KAIG3-RFI-WG-LS-1186 00 KAIG3-RFI-WG-LS-1186-00
KAIG3-RFI-WG-LS-1185 00 KAIG3-RFI-WG-LS-1185-00
KAIG3-RFI-WG-LS-1184 00 KAIG3-RFI-WG-LS-1184-00
KAIG3-RFI-WG-LS-1183 00 KAIG3-RFI-WG-LS-1183-00
KAIG3-RFI-SW-A-0747 00 KAIG3-RFI-SW-A-0747-00
KAIG3-RFI-SW-A-0746 00 KAIG3-RFI-SW-A-0746-00
KAIG3-RFI-AG-SS-0055 00 KAIG3-RFI-AG-SS-0055-00
KAIG3-RFI-CO-C-3482 00 KAIG3-RFI-CO-C-3482-00
KAIG3-RFI-MC-C-3452 00 KAIG3-RFI-MC-C-3452-00
KAIG3-RFI-MC-C-3527 00 KAIG3-RFI-MC-C-3527-00
KAIG3-RFI-CO-C-3528 00 KAIG3-RFI-CO-C-3528-00
KAIG3-RFI-CO-C-3483 00 KAIG3-RFI-CO-C-3483-00
KAIG3-RFI-MC-SU-2202 00 KAIG3-RFI-MC-SU-2202-00
KAIG3-RFI-MC-S-6406 00 KAIG3-RFI-MC-S-6406-00
KAIG3-RFI-MC-S-6407 00 KAIG3-RFI-MC-S-6407-00
KAIG3-RFI-MC-S-6404 00 KAIG3-RFI-MC-S-6404-00
KAIG3-RFI-MC-S-6405 00 KAIG3-RFI-MC-S-6405-00
KAIG3-RFI-LM-S-6399 00 KAIG3-RFI-LM-S-6399-00
KAIG3-RFI-CO-S-6400 00 KAIG3-RFI-CO-S-6400-00
KAIG3-RFI-CO-S-6401 00 KAIG3-RFI-CO-S-6401-00
KAIG3-RFI-CO-S-6402 00 KAIG3-RFI-CO-S-6402-00
KAIG3-RFI-CO-S-6254 01 KAIG3-RFI-CO-S-6254-01
KAIG3-RFI-CO-S-6264 01 KAIG3-RFI-CO-S-6264-01
KAIG3-RFI-CO-S-6294 01 KAIG3-RFI-CO-S-6294-01
KAIG3-RFI-WG-C-3488 00 KAIG3-RFI-WG-C-3488-00
KAIG3-RFI-WG-C-3487 00 KAIG3-RFI-WG-C-3487-00
KAIG3-RFI-WG-S-6394 00 KAIG3-RFI-WG-S-6394-00
KAIG3-RFI-MB-C-3486 00 KAIG3-RFI-MB-C-3486-00
KAIG3-RFI-DG-C-3485 00 KAIG3-RFI-DG-C-3485-00
KAIG3-RFI-PG-S-6392 00 KAIG3-RFI-PG-S-6392-00
KAIG3-RFI-CO-SU-2201 00 KAIG3-RFI-CO-SU-2201-00
KAIG3-RFI-CO-SU-2200 00 KAIG3-RFI-CO-SU-2200-00
KAIG3-RFI-CO-C-3496 00 KAIG3-RFI-CO-C-3496-00
KAIG3-RFI-CO-SS-0060 00 KAIG3-RFI-CO-SS-0060-00
KAIG3-RFI-CO-SS-0058 00 KAIG3-RFI-CO-SS-0058-00
KAIG3-RFI-CO-SS-0059 00 KAIG3-RFI-CO-SS-0059-00
KAIG3-RFI-LM-S-6398 00 KAIG3-RFI-LM-S-6398-00
KAIG3-RFI-CO-S-6395 00 KAIG3-RFI-CO-S-6395-00
KAIG3-RFI-CO-S-6396 00 KAIG3-RFI-CO-S-6396-00
KAIG3-RFI-CO-S-6388 00 KAIG3-RFI-CO-S-6388-00
KAIG3-RFI-LM-S-6391 00 KAIG3-RFI-LM-S-6391-00
KAIG3-RFI-CO-S-6387 00 KAIG3-RFI-CO-S-6387-00
KAIG3-RFI-TB-S-6377 00 KAIG3-RFI-TB-S-6377-00
KAIG3-RFI-DG-C-3479 00 KAIG3-RFI-DG-C-3479-00
KAIG3-RFI-WG-LS-1182 00 KAIG3-RFI-WG-LS-1182-00
KAIG3-RFI-WG-LS-1181 00 KAIG3-RFI-WG-LS-1181-00
KAIG3-RFI-WG-C-3468 00 KAIG3-RFI-WG-C-3468-00
KAIG3-RFI-WG-C-3467 00 KAIG3-RFI-WG-C-3467-00
KAIG3-RFI-ZG-C-3469 00 KAIG3-RFI-ZG-C-3469-00
KAIG3-RFI-WG-C-3463 00 KAIG3-RFI-WG-C-3463-00
KAIG3-RFI-SW-C-3505 00 KAIG3-RFI-SW-C-3505-00
KAIG3-RFI-SW-C-3503 00 KAIG3-RFI-SW-C-3503-00
KAIG3-RFI-SW-C-3502 00 KAIG3-RFI-SW-C-3502-00
KAIG3-RFI-SW-C-3501 00 KAIG3-RFI-SW-C-3501-00
KAIG3-RFI-SW-C-3500 00 KAIG3-RFI-SW-C-3500-00
KAIG3-RFI-SW-C-3498 00 KAIG3-RFI-SW-C-3498-00
KAIG3-RFI-SW-C-3497 00 KAIG3-RFI-SW-C-3497-00
KAIG3-RFI-SW-C-3495 00 KAIG3-RFI-SW-C-3495-00
KAIG3-RFI-SW-C-3494 00 KAIG3-RFI-SW-C-3494-00
KAIG3-RFI-SW-C-3493 00 KAIG3-RFI-SW-C-3493-00
KAIG3-RFI-SW-C-3492 00 KAIG3-RFI-SW-C-3492-00
KAIG3-RFI-SW-C-3491 00 KAIG3-RFI-SW-C-3491-00
KAIG3-RFI-SW-C-3490 00 KAIG3-RFI-SW-C-3490-00
KAIG3-RFI-SW-C-3489 00 KAIG3-RFI-SW-C-3489-00
KAIG3-RFI-SW-C-3475 00 KAIG3-RFI-SW-C-3475-00
KAIG3-RFI-SW-C-3447 00 KAIG3-RFI-SW-C-3447-00
KAIG3-RFI-SW-C-3484 00 KAIG3-RFI-SW-C-3484-00
KAIG3-RFI-SW-C-3480 00 KAIG3-RFI-SW-C-3480-00
KAIG3-RFI-SW-C-3476 00 KAIG3-RFI-SW-C-3476-00
KAIG3-RFI-SW-C-3474 00 KAIG3-RFI-SW-C-3474-00
KAIG3-RFI-SW-C-3473 00 KAIG3-RFI-SW-C-3473-00
KAIG3-RFI-SW-C-3472 00 KAIG3-RFI-SW-C-3472-00
KAIG3-RFI-SW-C-3471 00 KAIG3-RFI-SW-C-3471-00
KAIG3-RFI-SW-C-3470 00 KAIG3-RFI-SW-C-3470-00
KAIG3-RFI-SW-C-3403 01 KAIG3-RFI-SW-C-3403-01
KAIG3-RFI-SW-LC-0447 00 KAIG3-RFI-SW-LC-0447-00
KAIG3-RFI-SW-LC-0446 00 KAIG3-RFI-SW-LC-0446-00
KAIG3-RFI-ET-LC-0444 00 KAIG3-RFI-ET-LC-0444-00
KAIG3-RFI-ET-LC-0445 00 KAIG3-RFI-ET-LC-0445-00
KAIG3-RFI-ET-LC-0443 00 KAIG3-RFI-ET-LC-0443-00
KAIG3-RFI-ET-LC-0442 00 KAIG3-RFI-ET-LC-0442-00
KAIG3-RFI-CO-SU-2198 00 KAIG3-RFI-CO-SU-2198-00
KAIG3-RFI-MC-SU-2197 00 KAIG3-RFI-MC-SU-2197-00
KAIG3-RFI-LM-SU-2196 00 KAIG3-RFI-LM-SU-2196-00
KAIG3-RFI-CO-C-3481 00 KAIG3-RFI-CO-C-3481-00
KAIG3-RFI-CO-C-3384 00 KAIG3-RFI-CO-C-3384-00
KAIG3-RFI-MC-C-3450 00 KAIG3-RFI-MC-C-3450-00
KAIG3-RFI-MC-C-3477 00 KAIG3-RFI-MC-C-3477-00
KAIG3-RFI-MC-C-3478 00 KAIG3-RFI-MC-C-3478-00
KAIG3-RFI-CO-SS-0056 00 KAIG3-RFI-CO-SS-0056-00
KAIG3-RFI-CO-S-6385 00 KAIG3-RFI-CO-S-6385-00
KAIG3-RFI-CO-S-6386 00 KAIG3-RFI-CO-S-6386-00
KAIG3-RFI-CO-S-6384 00 KAIG3-RFI-CO-S-6384-00
KAIG3-RFI-LM-S-6381 00 KAIG3-RFI-LM-S-6381-00
KAIG3-RFI-CO-S-6340 00 KAIG3-RFI-CO-S-6340-00
KAIG3-RFI-CO-S-6349 00 KAIG3-RFI-CO-S-6349-00
KAIG3-RFI-CO-S-6382 00 KAIG3-RFI-CO-S-6382-00
KAIG3-RFI-CO-S-6383 00 KAIG3-RFI-CO-S-6383-00
KAIG3-RFI-CO-S-6378 00 KAIG3-RFI-CO-S-6378-00
KAIG3-RFI-LM-S-6380 00 KAIG3-RFI-LM-S-6380-00
KAIG3-RFI-PC-LC-0441 00 KAIG3-RFI-PC-LC-0441-00
KAIG3-RFI-MB-SU-2195 00 KAIG3-RFI-MB-SU-2195-00
KAIG3-RFI-TG-SU-2194 00 KAIG3-RFI-TG-SU-2194-00
KAIG3-RFI-MB-S-6376 00 KAIG3-RFI-MB-S-6376-00
KAIG3-RFI-ZG-SU-2193 00 KAIG3-RFI-ZG-SU-2193-00
KAIG3-RFI-TB-SU-2192 00 KAIG3-RFI-TB-SU-2192-00
KAIG3-RFI-TB-C-3462 00 KAIG3-RFI-TB-C-3462-00
KAIG3-RFI-WG-C-3446 00 KAIG3-RFI-WG-C-3446-00
KAIG3-RFI-SW-C-3466 00 KAIG3-RFI-SW-C-3466-00
KAIG3-RFI-SW-C-3465 00 KAIG3-RFI-SW-C-3465-00
KAIG3-RFI-SW-C-3464 00 KAIG3-RFI-SW-C-3464-00
KAIG3-RFI-SW-C-3461 00 KAIG3-RFI-SW-C-3461-00
KAIG3-RFI-SW-C-3460 00 KAIG3-RFI-SW-C-3460-00
KAIG3-RFI-SW-C-3459 00 KAIG3-RFI-SW-C-3459-00
KAIG3-RFI-SW-C-3458 00 KAIG3-RFI-SW-C-3458-00
KAIG3-RFI-SW-C-3457 00 KAIG3-RFI-SW-C-3457-00
KAIG3-RFI-SW-C-3456 00 KAIG3-RFI-SW-C-3456-00
KAIG3-RFI-SW-C-3455 00 KAIG3-RFI-SW-C-3455-00
KAIG3-RFI-SW-C-3454 00 KAIG3-RFI-SW-C-3454-00
KAIG3-RFI-SW-C-3453 00 KAIG3-RFI-SW-C-3453-00
KAIG3-RFI-SW-C-3009 01 KAIG3-RFI-SW-C-3009-01
KAIG3-RFI-SW-C-3008 01 KAIG3-RFI-SW-C-3008-01
KAIG3-RFI-SW-C-2949 01 KAIG3-RFI-SW-C-2949-01
KAIG3-RFI-CO-C-3418 00 KAIG3-RFI-CO-C-3418-00
KAIG3-RFI-MC-C-3448 00 KAIG3-RFI-MC-C-3448-00
KAIG3-RFI-MC-C-3449 00 KAIG3-RFI-MC-C-3449-00
KAIG3-RFI-CO-S-6247 01 KAIG3-RFI-CO-S-6247-01
KAIG3-RFI-MC-S-6290 01 KAIG3-RFI-MC-S-6290-01
KAIG3-RFI-LM-S-6375 00 KAIG3-RFI-LM-S-6375-00
KAIG3-RFI-PC-LC-0439 00 KAIG3-RFI-PC-LC-0439-00
KAIG3-RFI-PC-E-0385 00 KAIG3-RFI-PC-E-0385-00
KAIG3-RFI-PC-E-0384 00 KAIG3-RFI-PC-E-0384-00
KAIG3-RFI-PC-E-0383 00 KAIG3-RFI-PC-E-0383-00
KAIG3-RFI-PC-E-0382 00 KAIG3-RFI-PC-E-0382-00
KAIG3-RFI-PC-LC-0440 00 KAIG3-RFI-PC-LC-0440-00
KAIG3-RFI-CO-S-6202 01 KAIG3-RFI-CO-S-6202-01
KAIG3-RFI-SW-C-3417-00 00 KAIG3-RFI-SW-C-3417-00-00
KAIG3-RFI-SW-C-3416-00 00 KAIG3-RFI-SW-C-3416-00-00
KAIG3-RFI-WG-P-0191-00 00 KAIG3-RFI-WG-P-0191-00-00
KAIG3-RFI-TG-S-6374 00 KAIG3-RFI-TG-S-6374-00
KAIG3-RFI-DG-C-3445 00 KAIG3-RFI-DG-C-3445-00
KAIG3-RFI-PG-S-6364 00 KAIG3-RFI-PG-S-6364-00
KAIG3-RFI-ZG-C-3434 00 KAIG3-RFI-ZG-C-3434-00
KAIG3-RFI-ZG-C-3433 00 KAIG3-RFI-ZG-C-3433-00
KAIG3-RFI-WG-LS-1180 00 KAIG3-RFI-WG-LS-1180-00
KAIG3-RFI-WG-LS-1179 00 KAIG3-RFI-WG-LS-1179-00
KAIG3-RFI-WG-LS-1178 00 KAIG3-RFI-WG-LS-1178-00
KAIG3-RFI-WG-LS-1177 00 KAIG3-RFI-WG-LS-1177-00
KAIG3-RFI-SW-LS-1081 01 KAIG3-RFI-SW-LS-1081-01
KAIG3-RFI-SW-LS-1074 01 KAIG3-RFI-SW-LS-1074-01
KAIG3-RFI-SW-C-3444 00 KAIG3-RFI-SW-C-3444-00
KAIG3-RFI-SW-C-3443 00 KAIG3-RFI-SW-C-3443-00
KAIG3-RFI-SW-C-3442 00 KAIG3-RFI-SW-C-3442-00
KAIG3-RFI-WG-LS-1176 00 KAIG3-RFI-WG-LS-1176-00
KAIG3-RFI-SW-C-3441 00 KAIG3-RFI-SW-C-3441-00
KAIG3-RFI-SW-C-3440 00 KAIG3-RFI-SW-C-3440-00
KAIG3-RFI-SW-C-3439 00 KAIG3-RFI-SW-C-3439-00
KAIG3-RFI-SW-C-3438 00 KAIG3-RFI-SW-C-3438-00
KAIG3-RFI-WG-LS-1175 00 KAIG3-RFI-WG-LS-1175-00
KAIG3-RFI-SW-C-3431 00 KAIG3-RFI-SW-C-3431-00
KAIG3-RFI-SW-C-3430 00 KAIG3-RFI-SW-C-3430-00
KAIG3-RFI-WG-LS-1174 00 KAIG3-RFI-WG-LS-1174-00
KAIG3-RFI-WG-LS-1173 00 KAIG3-RFI-WG-LS-1173-00
KAIG3-RFI-CO-SU-2188 00 KAIG3-RFI-CO-SU-2188-00
KAIG3-RFI-CO-SU-2189 00 KAIG3-RFI-CO-SU-2189-00
KAIG3-RFI-CO-SU-2190 00 KAIG3-RFI-CO-SU-2190-00
KAIG3-RFI-CO-SU-2191 00 KAIG3-RFI-CO-SU-2191-00
KAIG3-RFI-CO-S-6359 00 KAIG3-RFI-CO-S-6359-00
KAIG3-RFI-CO-S-6360 00 KAIG3-RFI-CO-S-6360-00
KAIG3-RFI-CO-S-6361 00 KAIG3-RFI-CO-S-6361-00
KAIG3-RFI-CO-S-6366 00 KAIG3-RFI-CO-S-6366-00
KAIG3-RFI-CO-S-6367 00 KAIG3-RFI-CO-S-6367-00
KAIG3-RFI-CO-S-6368 00 KAIG3-RFI-CO-S-6368-00
KAIG3-RFI-CO-S-6369 00 KAIG3-RFI-CO-S-6369-00
KAIG3-RFI-CO-S-6370 00 KAIG3-RFI-CO-S-6370-00
KAIG3-RFI-CO-S-6371 00 KAIG3-RFI-CO-S-6371-00
KAIG3-RFI-CO-S-6372 00 KAIG3-RFI-CO-S-6372-00
KAIG3-RFI-SW-C-3224 00 KAIG3-RFI-SW-C-3224-00
KAIG3-RFI-CO-S-6322 00 KAIG3-RFI-CO-S-6322-00
KAIG3-RFI-CO-S-6297 00 KAIG3-RFI-CO-S-6297-00
KAIG3-RFI-CO-S-6262 00 KAIG3-RFI-CO-S-6262-00
KAIG3-RFI-WG-LS-1172 00 KAIG3-RFI-WG-LS-1172-00
KAIG3-RFI-MB-A-0745 00 KAIG3-RFI-MB-A-0745-00
KAIG3-RFI-MB-A-0744 00 KAIG3-RFI-MB-A-0744-00
KAIG3-RFI-TG-S-6363 00 KAIG3-RFI-TG-S-6363-00
KAIG3-RFI-WG-S-6362 00 KAIG3-RFI-WG-S-6362-00
KAIG3-RFI-ZG-C-3432 00 KAIG3-RFI-ZG-C-3432-00
KAIG3-RFI-WG-LS-1171 00 KAIG3-RFI-WG-LS-1171-00
KAIG3-RFI-WG-LS-1170 00 KAIG3-RFI-WG-LS-1170-00
KAIG3-RFI-WG-LS-1169 00 KAIG3-RFI-WG-LS-1169-00
KAIG3-RFI-WG-LS-1168 00 KAIG3-RFI-WG-LS-1168-00
KAIG3-RFI-WG-LS-1167 00 KAIG3-RFI-WG-LS-1167-00
KAIG3-RFI-SW-C-2242 02 KAIG3-RFI-SW-C-2242-02
KAIG3-RFI-SW-C-2240 02 KAIG3-RFI-SW-C-2240-02
KAIG3-RFI-SW-C-3255 01 KAIG3-RFI-SW-C-3255-01
KAIG3-RFI-SW-C-3415 00 KAIG3-RFI-SW-C-3415-00
KAIG3-RFI-SW-C-3414 00 KAIG3-RFI-SW-C-3414-00
KAIG3-RFI-SW-C-3413 00 KAIG3-RFI-SW-C-3413-00
KAIG3-RFI-SW-C-3412 00 KAIG3-RFI-SW-C-3412-00
KAIG3-RFI-SW-C-3411 00 KAIG3-RFI-SW-C-3411-00
KAIG3-RFI-SW-C-3410 00 KAIG3-RFI-SW-C-3410-00
KAIG3-RFI-SW-C-3409 00 KAIG3-RFI-SW-C-3409-00
KAIG3-RFI-SW-C-3408 00 KAIG3-RFI-SW-C-3408-00
KAIG3-RFI-SW-C-3437 00 KAIG3-RFI-SW-C-3437-00
KAIG3-RFI-SW-C-3436 00 KAIG3-RFI-SW-C-3436-00
KAIG3-RFI-SW-C-3435 00 KAIG3-RFI-SW-C-3435-00
KAIG3-RFI-SW-C-3429 00 KAIG3-RFI-SW-C-3429-00
KAIG3-RFI-SW-C-3428 00 KAIG3-RFI-SW-C-3428-00
KAIG3-RFI-SW-C-3427 00 KAIG3-RFI-SW-C-3427-00
KAIG3-RFI-SW-C-3426 00 KAIG3-RFI-SW-C-3426-00
KAIG3-RFI-SW-C-3425 00 KAIG3-RFI-SW-C-3425-00
KAIG3-RFI-SW-C-3424 00 KAIG3-RFI-SW-C-3424-00
KAIG3-RFI-SW-C-3423 00 KAIG3-RFI-SW-C-3423-00
KAIG3-RFI-SW-C-3422 00 KAIG3-RFI-SW-C-3422-00
KAIG3-RFI-SW-C-3421 00 KAIG3-RFI-SW-C-3421-00
KAIG3-RFI-SW-C-3420 00 KAIG3-RFI-SW-C-3420-00
KAIG3-RFI-CO-SU-2187 00 KAIG3-RFI-CO-SU-2187-00
KAIG3-RFI-CO-SU-2186 00 KAIG3-RFI-CO-SU-2186-00
KAIG3-RFI-CO-SU-2185 00 KAIG3-RFI-CO-SU-2185-00
KAIG3-RFI-MC-C-3419 00 KAIG3-RFI-MC-C-3419-00
KAIG3-RFI-CO-S-6356 00 KAIG3-RFI-CO-S-6356-00
KAIG3-RFI-CO-S-6355 00 KAIG3-RFI-CO-S-6355-00
KAIG3-RFI-CO-S-6358 00 KAIG3-RFI-CO-S-6358-00
KAIG3-RFI-CO-S-6357 00 KAIG3-RFI-CO-S-6357-00
KAIG3-RFI-SW-E-0381 00 KAIG3-RFI-SW-E-0381-00
KAIG3-RFI-SW-E-0380 00 KAIG3-RFI-SW-E-0380-00
KAIG3-RFI-PG-S-6347 00 KAIG3-RFI-PG-S-6347-00
KAIG3-RFI-PG-S-6346 00 KAIG3-RFI-PG-S-6346-00
KAIG3-RFI-ZG-C-3407 00 KAIG3-RFI-ZG-C-3407-00
KAIG3-RFI-WG-S-6252 01 KAIG3-RFI-WG-S-6252-01
KAIG3-RFI-CO-SS-0054 00 KAIG3-RFI-CO-SS-0054-00
KAIG3-RFI-CO-SU-2183 00 KAIG3-RFI-CO-SU-2183-00
KAIG3-RFI-SW-C-3406 00 KAIG3-RFI-SW-C-3406-00
KAIG3-RFI-CO-SU-2184 00 KAIG3-RFI-CO-SU-2184-00
KAIG3-RFI-SW-C-3405 00 KAIG3-RFI-SW-C-3405-00
KAIG3-RFI-CO-S-6353 00 KAIG3-RFI-CO-S-6353-00
KAIG3-RFI-LM-S-6354 00 KAIG3-RFI-LM-S-6354-00
KAIG3-RFI-MC-S-6000 02 KAIG3-RFI-MC-S-6000-02
KAIG3-RFI-MC-S-6342 00 KAIG3-RFI-MC-S-6342-00
KAIG3-RFI-MC-S-6343 00 KAIG3-RFI-MC-S-6343-00
KAIG3-RFI-MC-S-6344 00 KAIG3-RFI-MC-S-6344-00
KAIG3-RFI-LM-S-6345 00 KAIG3-RFI-LM-S-6345-00
KAIG3-RFI-CO-S-6348 00 KAIG3-RFI-CO-S-6348-00
KAIG3-RFI-CO-S-6351 00 KAIG3-RFI-CO-S-6351-00
KAIG3-RFI-CO-S-6352 00 KAIG3-RFI-CO-S-6352-00
KAIG3-RFI-SW-C-3404 00 KAIG3-RFI-SW-C-3404-00
KAIG3-RFI-SW-C-3403 00 KAIG3-RFI-SW-C-3403-00
KAIG3-RFI-SW-C-3402 00 KAIG3-RFI-SW-C-3402-00
KAIG3-RFI-SW-C-3401 00 KAIG3-RFI-SW-C-3401-00
KAIG3-RFI-SW-C-3400 00 KAIG3-RFI-SW-C-3400-00
KAIG3-RFI-SW-C-3399 00 KAIG3-RFI-SW-C-3399-00
KAIG3-RFI-SW-C-3398 00 KAIG3-RFI-SW-C-3398-00
KAIG3-RFI-SW-C-3397 00 KAIG3-RFI-SW-C-3397-00
KAIG3-RFI-SW-P-0190 00 KAIG3-RFI-SW-P-0190-00
KAIG3-RFI-SW-P-0189 00 KAIG3-RFI-SW-P-0189-00
KAIG3-RFI-PG-C-3392 00 KAIG3-RFI-PG-C-3392-00
KAIG3-RFI-PG-SU-2181 00 KAIG3-RFI-PG-SU-2181-00
KAIG3-RFI-DG-C-3391 00 KAIG3-RFI-DG-C-3391-00
KAIG3-RFI-ZG-S-6341 00 KAIG3-RFI-ZG-S-6341-00
KAIG3-RFI-SW-C-3396 00 KAIG3-RFI-SW-C-3396-00
KAIG3-RFI-SW-C-3395 00 KAIG3-RFI-SW-C-3395-00
KAIG3-RFI-SW-C-3394 00 KAIG3-RFI-SW-C-3394-00
KAIG3-RFI-SW-C-3393 00 KAIG3-RFI-SW-C-3393-00
KAIG3-RFI-SW-C-3389 00 KAIG3-RFI-SW-C-3389-00
KAIG3-RFI-SW-C-3388 00 KAIG3-RFI-SW-C-3388-00
KAIG3-RFI-SW-C-3387 00 KAIG3-RFI-SW-C-3387-00
KAIG3-RFI-SW-C-3386 00 KAIG3-RFI-SW-C-3386-00
KAIG3-RFI-PA-C-3385 00 KAIG3-RFI-PA-C-3385-00
KAIG3-RFI-SW-C-3376 00 KAIG3-RFI-SW-C-3376-00
KAIG3-RFI-SW-C-3375 00 KAIG3-RFI-SW-C-3375-00
KAIG3-RFI-CO-S-6319 00 KAIG3-RFI-CO-S-6319-00
KAIG3-RFI-MC-C-3383 00 KAIG3-RFI-MC-C-3383-00
KAIG3-RFI-CO-C-3382 00 KAIG3-RFI-CO-C-3382-00
KAIG3-RFI-CO-SS-0053 00 KAIG3-RFI-CO-SS-0053-00
KAIG3-RFI-CO-SU-2180 00 KAIG3-RFI-CO-SU-2180-00
KAIG3-RFI-CO-S-6338 00 KAIG3-RFI-CO-S-6338-00
KAIG3-RFI-CO-S-6339 00 KAIG3-RFI-CO-S-6339-00
KAIG3-RFI-PG-S-6337 00 KAIG3-RFI-PG-S-6337-00
KAIG3-RFI-DG-C-3378 00 KAIG3-RFI-DG-C-3378-00
KAIG3-RFI-SW-LS-1165 00 KAIG3-RFI-SW-LS-1165-00
KAIG3-RFI-SG-C-3377 00 KAIG3-RFI-SG-C-3377-00
KAIG3-RFI-WG-S-6336 00 KAIG3-RFI-WG-S-6336-00
KAIG3-RFI-MB-A-0743 00 KAIG3-RFI-MB-A-0743-00
KAIG3-RFI-MB-A-0742 00 KAIG3-RFI-MB-A-0742-00
KAIG3-RFI-SW-LS-1164 00 KAIG3-RFI-SW-LS-1164-00
KAIG3-RFI-SW-LS-1163 00 KAIG3-RFI-SW-LS-1163-00
KAIG3-RFI-WG-LS-1166 00 KAIG3-RFI-WG-LS-1166-00
KAIG3-RFI-SW-C-3379 00 KAIG3-RFI-SW-C-3379-00
KAIG3-RFI-SW-C-3374 00 KAIG3-RFI-SW-C-3374-00
KAIG3-RFI-SW-C-3373 00 KAIG3-RFI-SW-C-3373-00
KAIG3-RFI-SW-C-3371 00 KAIG3-RFI-SW-C-3371-00
KAIG3-RFI-SW-C-3370 00 KAIG3-RFI-SW-C-3370-00
KAIG3-RFI-SW-C-3369 00 KAIG3-RFI-SW-C-3369-00
KAIG3-RFI-SW-C-3368 00 KAIG3-RFI-SW-C-3368-00
KAIG3-RFI-SW-C-3367 00 KAIG3-RFI-SW-C-3367-00
KAIG3-RFI-SW-C-3366 00 KAIG3-RFI-SW-C-3366-00
KAIG3-RFI-CO-C-3380 00 KAIG3-RFI-CO-C-3380-00
KAIG3-RFI-MC-C-3381 00 KAIG3-RFI-MC-C-3381-00
KAIG3-RFI-MC-C-3372 00 KAIG3-RFI-MC-C-3372-00
KAIG3-RFI-CO-SU-2176 00 KAIG3-RFI-CO-SU-2176-00
KAIG3-RFI-CO-SU-2177 00 KAIG3-RFI-CO-SU-2177-00
KAIG3-RFI-LM-SU-2179 00 KAIG3-RFI-LM-SU-2179-00
KAIG3-RFI-CO-SU-2178 00 KAIG3-RFI-CO-SU-2178-00
KAIG3-RFI-CO-S-6327 00 KAIG3-RFI-CO-S-6327-00
KAIG3-RFI-CO-S-6328 00 KAIG3-RFI-CO-S-6328-00
KAIG3-RFI-CO-S-6329 00 KAIG3-RFI-CO-S-6329-00
KAIG3-RFI-CO-S-6330 00 KAIG3-RFI-CO-S-6330-00
KAIG3-RFI-LM-S-6333 00 KAIG3-RFI-LM-S-6333-00
KAIG3-RFI-LM-S-6334 00 KAIG3-RFI-LM-S-6334-00
KAIG3-RFI-LM-S-6335 00 KAIG3-RFI-LM-S-6335-00
KAIG3-RFI-CO-S-6331 00 KAIG3-RFI-CO-S-6331-00
KAIG3-RFI-CO-S-6332 00 KAIG3-RFI-CO-S-6332-00
KAIG3-RFI-SW-C-3355-00 00 KAIG3-RFI-SW-C-3355-00-00
KAIG3-RFI-SW-LS-1162 00 KAIG3-RFI-SW-LS-1162-00
KAIG3-RFI-SW-LS-1161 00 KAIG3-RFI-SW-LS-1161-00
KAIG3-RFI-SW-LS-1160 00 KAIG3-RFI-SW-LS-1160-00
KAIG3-RFI-SW-LS-1159 00 KAIG3-RFI-SW-LS-1159-00
KAIG3-RFI-SW-LS-1158 00 KAIG3-RFI-SW-LS-1158-00
KAIG3-RFI-SW-C-3365 00 KAIG3-RFI-SW-C-3365-00
KAIG3-RFI-SW-C-3364 00 KAIG3-RFI-SW-C-3364-00
KAIG3-RFI-SW-C-3363 00 KAIG3-RFI-SW-C-3363-00
KAIG3-RFI-SW-C-3362 00 KAIG3-RFI-SW-C-3362-00
KAIG3-RFI-SW-C-3361 00 KAIG3-RFI-SW-C-3361-00
KAIG3-RFI-SW-C-3354 00 KAIG3-RFI-SW-C-3354-00
KAIG3-RFI-SW-C-3353 00 KAIG3-RFI-SW-C-3353-00
KAIG3-RFI-SW-C-3352 00 KAIG3-RFI-SW-C-3352-00
KAIG3-RFI-SW-C-3351 00 KAIG3-RFI-SW-C-3351-00
KAIG3-RFI-SW-C-3350 00 KAIG3-RFI-SW-C-3350-00
KAIG3-RFI-SW-C-3349 00 KAIG3-RFI-SW-C-3349-00
KAIG3-RFI-SW-C-3348 00 KAIG3-RFI-SW-C-3348-00
KAIG3-RFI-SW-C-3345 00 KAIG3-RFI-SW-C-3345-00
KAIG3-RFI-SW-C-3344 00 KAIG3-RFI-SW-C-3344-00
KAIG3-RFI-SW-C-3343 00 KAIG3-RFI-SW-C-3343-00
KAIG3-RFI-SW-C-3342 00 KAIG3-RFI-SW-C-3342-00
KAIG3-RFI-SW-C-3341 00 KAIG3-RFI-SW-C-3341-00
KAIG3-RFI-SW-C-3340 00 KAIG3-RFI-SW-C-3340-00
KAIG3-RFI-SW-C-3339 00 KAIG3-RFI-SW-C-3339-00
KAIG3-RFI-SW-C-3338 00 KAIG3-RFI-SW-C-3338-00
KAIG3-RFI-SW-C-3337 00 KAIG3-RFI-SW-C-3337-00
KAIG3-RFI-SW-C-3336 00 KAIG3-RFI-SW-C-3336-00
KAIG3-RFI-SW-C-3335 00 KAIG3-RFI-SW-C-3335-00
KAIG3-RFI-CO-C-3360 00 KAIG3-RFI-CO-C-3360-00
KAIG3-RFI-CO-C-3357 00 KAIG3-RFI-CO-C-3357-00
KAIG3-RFI-MC-C-3356 00 KAIG3-RFI-MC-C-3356-00
KAIG3-RFI-CO-C-3358 00 KAIG3-RFI-CO-C-3358-00
KAIG3-RFI-CO-C-3359 00 KAIG3-RFI-CO-C-3359-00
KAIG3-RFI-CO-C-3328 00 KAIG3-RFI-CO-C-3328-00
KAIG3-RFI-CO-SU-2175 00 KAIG3-RFI-CO-SU-2175-00
KAIG3-RFI-CO-SU-2173 00 KAIG3-RFI-CO-SU-2173-00
KAIG3-RFI-CO-SU-2174 00 KAIG3-RFI-CO-SU-2174-00
KAIG3-RFI-CO-S-6320 00 KAIG3-RFI-CO-S-6320-00
KAIG3-RFI-CO-S-6321 00 KAIG3-RFI-CO-S-6321-00
KAIG3-RFI-WG-C-3347 00 KAIG3-RFI-WG-C-3347-00
KAIG3-RFI-MB-A-0741 00 KAIG3-RFI-MB-A-0741-00
KAIG3-RFI-MB-A-0740 00 KAIG3-RFI-MB-A-0740-00
KAIG3-RFI-DG-S-6326 00 KAIG3-RFI-DG-S-6326-00
KAIG3-RFI-DG-S-6325 00 KAIG3-RFI-DG-S-6325-00
KAIG3-RFI-DG-S-6324 00 KAIG3-RFI-DG-S-6324-00
KAIG3-RFI-DG-C-3346 00 KAIG3-RFI-DG-C-3346-00
KAIG3-RFI-PG-S-6323 00 KAIG3-RFI-PG-S-6323-00
KAIG3-RFI-TG-S-6245 00 KAIG3-RFI-TG-S-6245-00
KAIG3-RFI-SW-LS-1157 00 KAIG3-RFI-SW-LS-1157-00
KAIG3-RFI-SW-LS-1151 00 KAIG3-RFI-SW-LS-1151-00
KAIG3-RFI-SW-LS-1150 00 KAIG3-RFI-SW-LS-1150-00
KAIG3-RFI-SW-LS-1148 00 KAIG3-RFI-SW-LS-1148-00
KAIG3-RFI-SW-LS-1147 00 KAIG3-RFI-SW-LS-1147-00
KAIG3-RFI-SW-LS-1146 00 KAIG3-RFI-SW-LS-1146-00
KAIG3-RFI-SW-LS-1145 00 KAIG3-RFI-SW-LS-1145-00
KAIG3-RFI-SG-LC-0215 01 KAIG3-RFI-SG-LC-0215-01
KAIG3-RFI-SG-LC-0438 00 KAIG3-RFI-SG-LC-0438-00
KAIG3-RFI-SW-C-3333 00 KAIG3-RFI-SW-C-3333-00
KAIG3-RFI-SW-C-3332 00 KAIG3-RFI-SW-C-3332-00
KAIG3-RFI-SW-C-3331 00 KAIG3-RFI-SW-C-3331-00
KAIG3-RFI-SW-C-3325 00 KAIG3-RFI-SW-C-3325-00
KAIG3-RFI-SW-C-3324 00 KAIG3-RFI-SW-C-3324-00
KAIG3-RFI-SW-C-3323 00 KAIG3-RFI-SW-C-3323-00
KAIG3-RFI-SW-C-3322 00 KAIG3-RFI-SW-C-3322-00
KAIG3-RFI-SW-C-3321 00 KAIG3-RFI-SW-C-3321-00
KAIG3-RFI-SW-C-3320 00 KAIG3-RFI-SW-C-3320-00
KAIG3-RFI-SW-C-3319 00 KAIG3-RFI-SW-C-3319-00
KAIG3-RFI-SW-C-3314 00 KAIG3-RFI-SW-C-3314-00
KAIG3-RFI-SW-C-1469 02 KAIG3-RFI-SW-C-1469-02
KAIG3-RFI-PG-C-3330 00 KAIG3-RFI-PG-C-3330-00
KAIG3-RFI-ZG-C-3329 00 KAIG3-RFI-ZG-C-3329-00
KAIG3-RFI-TG-S-6316 00 KAIG3-RFI-TG-S-6316-00
KAIG3-RFI-TG-S-6315 00 KAIG3-RFI-TG-S-6315-00
KAIG3-RFI-TG-S-6314 00 KAIG3-RFI-TG-S-6314-00
KAIG3-RFI-TG-S-6313 00 KAIG3-RFI-TG-S-6313-00
KAIG3-RFI-TG-S-6312 00 KAIG3-RFI-TG-S-6312-00
KAIG3-RFI-CO-SU-2172 00 KAIG3-RFI-CO-SU-2172-00
KAIG3-RFI-CO-S-6318 00 KAIG3-RFI-CO-S-6318-00
KAIG3-RFI-CO-S-6317 00 KAIG3-RFI-CO-S-6317-00
KAIG3-RFI-MC-C-3326 00 KAIG3-RFI-MC-C-3326-00
KAIG3-RFI-MC-C-3327 00 KAIG3-RFI-MC-C-3327-00
KAIG3-RFI-WG-LS-1156 00 KAIG3-RFI-WG-LS-1156-00
KAIG3-RFI-WG-LS-1155 00 KAIG3-RFI-WG-LS-1155-00
KAIG3-RFI-WG-LS-1153 00 KAIG3-RFI-WG-LS-1153-00
KAIG3-RFI-WG-LS-1152 00 KAIG3-RFI-WG-LS-1152-00
KAIG3-RFI-WG-LS-1138-00 00 KAIG3-RFI-WG-LS-1138-00-00
KAIG3-RFI-WG-LS-1137 00 KAIG3-RFI-WG-LS-1137-00
KAIG3-RFI-MB-P-0188 00 KAIG3-RFI-MB-P-0188-00
KAIG3-RFI-SW-LC-0415 01 KAIG3-RFI-SW-LC-0415-01
KAIG3-RFI-MB-S-6308 00 KAIG3-RFI-MB-S-6308-00
KAIG3-RFI-TG-S-6307 00 KAIG3-RFI-TG-S-6307-00
KAIG3-RFI-TG-S-6306 00 KAIG3-RFI-TG-S-6306-00
KAIG3-RFI-TG-S-6305 00 KAIG3-RFI-TG-S-6305-00
KAIG3-RFI-PG-C-3308 00 KAIG3-RFI-PG-C-3308-00
KAIG3-RFI-SG-C-3307 00 KAIG3-RFI-SG-C-3307-00
KAIG3-RFI-ZG-C-3306 00 KAIG3-RFI-ZG-C-3306-00
KAIG3-RFI-ZG-C-3305 00 KAIG3-RFI-ZG-C-3305-00
KAIG3-RFI-PG-S-6304 00 KAIG3-RFI-PG-S-6304-00
KAIG3-RFI-PG-S-6303 00 KAIG3-RFI-PG-S-6303-00
KAIG3-RFI-PG-S-6300 00 KAIG3-RFI-PG-S-6300-00
KAIG3-RFI-WG-LS-1136 00 KAIG3-RFI-WG-LS-1136-00
KAIG3-RFI-ZG-LS-1135 00 KAIG3-RFI-ZG-LS-1135-00
KAIG3-RFI-WG-LS-1134 00 KAIG3-RFI-WG-LS-1134-00
KAIG3-RFI-PG-S-6289 00 KAIG3-RFI-PG-S-6289-00
KAIG3-RFI-WG-LS-1133 00 KAIG3-RFI-WG-LS-1133-00
KAIG3-RFI-WG-LS-1128 00 KAIG3-RFI-WG-LS-1128-00
KAIG3-RFI-WG-LS-1127 00 KAIG3-RFI-WG-LS-1127-00
KAIG3-RFI-WG-LS-1126 00 KAIG3-RFI-WG-LS-1126-00
KAIG3-RFI-SW-LS-1143 00 KAIG3-RFI-SW-LS-1143-00
KAIG3-RFI-SW-LS-1142 00 KAIG3-RFI-SW-LS-1142-00
KAIG3-RFI-SW-LS-1141 00 KAIG3-RFI-SW-LS-1141-00
KAIG3-RFI-SW-LS-1140 00 KAIG3-RFI-SW-LS-1140-00
KAIG3-RFI-SW-C-3318 00 KAIG3-RFI-SW-C-3318-00
KAIG3-RFI-SW-C-3317 00 KAIG3-RFI-SW-C-3317-00
KAIG3-RFI-SW-C-3316 00 KAIG3-RFI-SW-C-3316-00
KAIG3-RFI-SW-LC-0414 01 KAIG3-RFI-SW-LC-0414-01
KAIG3-RFI-SW-LC-0436 00 KAIG3-RFI-SW-LC-0436-00
KAIG3-RFI-SW-E-0379 00 KAIG3-RFI-SW-E-0379-00
KAIG3-RFI-SW-E-0350 01 KAIG3-RFI-SW-E-0350-01
KAIG3-RFI-CO-SS-0052 00 KAIG3-RFI-CO-SS-0052-00
KAIG3-RFI-SW-C-3315 00 KAIG3-RFI-SW-C-3315-00
KAIG3-RFI-LM-SU-2169 00 KAIG3-RFI-LM-SU-2169-00
KAIG3-RFI-SW-C-3313 00 KAIG3-RFI-SW-C-3313-00
KAIG3-RFI-CO-SU-2170 00 KAIG3-RFI-CO-SU-2170-00
KAIG3-RFI-SW-C-3311 00 KAIG3-RFI-SW-C-3311-00
KAIG3-RFI-CO-SU-2171 00 KAIG3-RFI-CO-SU-2171-00
KAIG3-RFI-SW-C-3312 00 KAIG3-RFI-SW-C-3312-00
KAIG3-RFI-SW-C-3310 00 KAIG3-RFI-SW-C-3310-00
KAIG3-RFI-CO-SU-2168 00 KAIG3-RFI-CO-SU-2168-00
KAIG3-RFI-SW-C-3309 00 KAIG3-RFI-SW-C-3309-00
KAIG3-RFI-SW-C-3301 00 KAIG3-RFI-SW-C-3301-00
KAIG3-RFI-LM-S-6305 00 KAIG3-RFI-LM-S-6305-00
KAIG3-RFI-SW-C-3300 00 KAIG3-RFI-SW-C-3300-00
KAIG3-RFI-SW-C-3272 01 KAIG3-RFI-SW-C-3272-01
KAIG3-RFI-LM-S-6304 00 KAIG3-RFI-LM-S-6304-00
KAIG3-RFI-LM-S-6301 00 KAIG3-RFI-LM-S-6301-00
KAIG3-RFI-CO-S-6306 00 KAIG3-RFI-CO-S-6306-00
KAIG3-RFI-CO-S-6307 00 KAIG3-RFI-CO-S-6307-00
KAIG3-RFI-CO-S-6308 00 KAIG3-RFI-CO-S-6308-00
KAIG3-RFI-CO-S-6309 00 KAIG3-RFI-CO-S-6309-00
KAIG3-RFI-MC-S-6310 00 KAIG3-RFI-MC-S-6310-00
KAIG3-RFI-CO-SS-0050 00 KAIG3-RFI-CO-SS-0050-00
KAIG3-RFI-MC-S-6311 00 KAIG3-RFI-MC-S-6311-00
KAIG3-RFI-CO-S-6227 01 KAIG3-RFI-CO-S-6227-01
KAIG3-RFI-CO-S-6302 00 KAIG3-RFI-CO-S-6302-00
KAIG3-RFI-CO-S-6303 00 KAIG3-RFI-CO-S-6303-00
KAIG3-RFI-SW-LS-1132 00 KAIG3-RFI-SW-LS-1132-00
KAIG3-RFI-SW-LS-1131 00 KAIG3-RFI-SW-LS-1131-00
KAIG3-RFI-SW-LS-1130 00 KAIG3-RFI-SW-LS-1130-00
KAIG3-RFI-SW-LS-1129 00 KAIG3-RFI-SW-LS-1129-00
KAIG3-RFI-SW-C-3304 00 KAIG3-RFI-SW-C-3304-00
KAIG3-RFI-SW-C-3303 00 KAIG3-RFI-SW-C-3303-00
KAIG3-RFI-SW-C-3302 00 KAIG3-RFI-SW-C-3302-00
KAIG3-RFI-SW-C-3299 00 KAIG3-RFI-SW-C-3299-00
KAIG3-RFI-SW-C-3298 00 KAIG3-RFI-SW-C-3298-00
KAIG3-RFI-SW-C-3297 00 KAIG3-RFI-SW-C-3297-00
KAIG3-RFI-SW-C-3296 00 KAIG3-RFI-SW-C-3296-00
KAIG3-RFI-SW-C-3295 00 KAIG3-RFI-SW-C-3295-00
KAIG3-RFI-SW-C-3294 00 KAIG3-RFI-SW-C-3294-00
KAIG3-RFI-SW-C-3293 00 KAIG3-RFI-SW-C-3293-00
KAIG3-RFI-SW-C-3292 00 KAIG3-RFI-SW-C-3292-00
KAIG3-RFI-SW-C-3291 00 KAIG3-RFI-SW-C-3291-00
KAIG3-RFI-SW-C-3290 00 KAIG3-RFI-SW-C-3290-00
KAIG3-RFI-SW-C-3289 00 KAIG3-RFI-SW-C-3289-00
KAIG3-RFI-SW-C-3288 00 KAIG3-RFI-SW-C-3288-00
KAIG3-RFI-SW-C-3287-00 00 KAIG3-RFI-SW-C-3287-00-00
KAIG3-RFI-SW-C-3287 00 KAIG3-RFI-SW-C-3287-00
KAIG3-RFI-SW-C-3286 00 KAIG3-RFI-SW-C-3286-00
KAIG3-RFI-SW-C-3285 00 KAIG3-RFI-SW-C-3285-00
KAIG3-RFI-SW-C-3284 00 KAIG3-RFI-SW-C-3284-00
KAIG3-RFI-SW-C-3283 00 KAIG3-RFI-SW-C-3283-00
KAIG3-RFI-SW-C-3282 00 KAIG3-RFI-SW-C-3282-00
KAIG3-RFI-SW-C-3281 00 KAIG3-RFI-SW-C-3281-00
KAIG3-RFI-SW-C-3280 00 KAIG3-RFI-SW-C-3280-00
KAIG3-RFI-SW-C-3279 00 KAIG3-RFI-SW-C-3279-00
KAIG3-RFI-SW-C-3278 00 KAIG3-RFI-SW-C-3278-00
KAIG3-RFI-SW-C-3041 01 KAIG3-RFI-SW-C-3041-01
KAIG3-RFI-CO-SS-0051 00 KAIG3-RFI-CO-SS-0051-00
KAIG3-RFI-CO-S-6298 00 KAIG3-RFI-CO-S-6298-00
KAIG3-RFI-WG-LS-1125 00 KAIG3-RFI-WG-LS-1125-00
KAIG3-RFI-CO-C-3220 00 KAIG3-RFI-CO-C-3220-00
KAIG3-RFI-WG-LS-1122 00 KAIG3-RFI-WG-LS-1122-00
KAIG3-RFI-WG-LS-1121 00 KAIG3-RFI-WG-LS-1121-00
KAIG3-RFI-MB-A-0738 00 KAIG3-RFI-MB-A-0738-00
KAIG3-RFI-MB-A-0737 00 KAIG3-RFI-MB-A-0737-00
KAIG3-RFI-TG-S-6299 00 KAIG3-RFI-TG-S-6299-00
KAIG3-RFI-PG-SS-0038 00 KAIG3-RFI-PG-SS-0038-00
KAIG3-RFI-PG-SU-2167 00 KAIG3-RFI-PG-SU-2167-00
KAIG3-RFI-SW-LS-1124 00 KAIG3-RFI-SW-LS-1124-00
KAIG3-RFI-SW-LS-1123 00 KAIG3-RFI-SW-LS-1123-00
KAIG3-RFI-SW-LS-1117 00 KAIG3-RFI-SW-LS-1117-00
KAIG3-RFI-SW-LS-1116 00 KAIG3-RFI-SW-LS-1116-00
KAIG3-RFI-SW-LS-1115 00 KAIG3-RFI-SW-LS-1115-00
KAIG3-RFI-SW-LS-1114 00 KAIG3-RFI-SW-LS-1114-00
KAIG3-RFI-SW-LS-1113 00 KAIG3-RFI-SW-LS-1113-00
KAIG3-RFI-SW-C-3277 00 KAIG3-RFI-SW-C-3277-00
KAIG3-RFI-SW-C-3276 00 KAIG3-RFI-SW-C-3276-00
KAIG3-RFI-SW-C-3275 00 KAIG3-RFI-SW-C-3275-00
KAIG3-RFI-SW-C-3274 00 KAIG3-RFI-SW-C-3274-00
KAIG3-RFI-SW-C-3273 00 KAIG3-RFI-SW-C-3273-00
KAIG3-RFI-SW-C-3272 00 KAIG3-RFI-SW-C-3272-00
KAIG3-RFI-SW-C-3271 00 KAIG3-RFI-SW-C-3271-00
KAIG3-RFI-SW-C-3270 00 KAIG3-RFI-SW-C-3270-00
KAIG3-RFI-SW-C-3269 00 KAIG3-RFI-SW-C-3269-00
KAIG3-RFI-SW-C-3265 00 KAIG3-RFI-SW-C-3265-00
KAIG3-RFI-SW-C-3264 00 KAIG3-RFI-SW-C-3264-00
KAIG3-RFI-SW-C-3263 00 KAIG3-RFI-SW-C-3263-00
KAIG3-RFI-SW-C-3262 00 KAIG3-RFI-SW-C-3262-00
KAIG3-RFI-SW-C-3261 00 KAIG3-RFI-SW-C-3261-00
KAIG3-RFI-SW-C-3260 00 KAIG3-RFI-SW-C-3260-00
KAIG3-RFI-SW-C-3259 00 KAIG3-RFI-SW-C-3259-00
KAIG3-RFI-SW-C-3258 00 KAIG3-RFI-SW-C-3258-00
KAIG3-RFI-PA-C-3257 00 KAIG3-RFI-PA-C-3257-00
KAIG3-RFI-SW-C-3244 00 KAIG3-RFI-SW-C-3244-00
KAIG3-RFI-SW-C-3234 00 KAIG3-RFI-SW-C-3234-00
KAIG3-RFI-SW-C-3150 01 KAIG3-RFI-SW-C-3150-01
KAIG3-RFI-SW-C-3149 01 KAIG3-RFI-SW-C-3149-01
KAIG3-RFI-SW-C-3148 01 KAIG3-RFI-SW-C-3148-01
KAIG3-RFI-SW-LC-0437 00 KAIG3-RFI-SW-LC-0437-00
KAIG3-RFI-PG-LC-0435 00 KAIG3-RFI-PG-LC-0435-00
KAIG3-RFI-PG-LC-0434 00 KAIG3-RFI-PG-LC-0434-00
KAIG3-RFI-SW-E-0378 00 KAIG3-RFI-SW-E-0378-00
KAIG3-RFI-SW-E-0376 00 KAIG3-RFI-SW-E-0376-00
KAIG3-RFI-PG-S-6287 00 KAIG3-RFI-PG-S-6287-00
KAIG3-RFI-PG-S-6286 00 KAIG3-RFI-PG-S-6286-00
KAIG3-RFI-PG-S-6285 00 KAIG3-RFI-PG-S-6285-00
KAIG3-RFI-PG-S-6284 00 KAIG3-RFI-PG-S-6284-00
KAIG3-RFI-TG-S-6283 00 KAIG3-RFI-TG-S-6283-00
KAIG3-RFI-TG-S-6282 00 KAIG3-RFI-TG-S-6282-00
KAIG3-RFI-TG-S-6281 00 KAIG3-RFI-TG-S-6281-00
KAIG3-RFI-TG-S-6280 00 KAIG3-RFI-TG-S-6280-00
KAIG3-RFI-ZG-C-3267 00 KAIG3-RFI-ZG-C-3267-00
KAIG3-RFI-PG-C-3266 00 KAIG3-RFI-PG-C-3266-00
KAIG3-RFI-TG-SU-2166 00 KAIG3-RFI-TG-SU-2166-00
KAIG3-RFI-TG-C-3268 00 KAIG3-RFI-TG-C-3268-00
KAIG3-RFI-MB-S-6288 00 KAIG3-RFI-MB-S-6288-00
KAIG3-RFI-WG-LS-1120 00 KAIG3-RFI-WG-LS-1120-00
KAIG3-RFI-WG-LS-1119 00 KAIG3-RFI-WG-LS-1119-00
KAIG3-RFI-WG-LS-1118 00 KAIG3-RFI-WG-LS-1118-00
KAIG3-RFI-WG-LS-1110 00 KAIG3-RFI-WG-LS-1110-00
KAIG3-RFI-CO-E-0377 00 KAIG3-RFI-CO-E-0377-00
KAIG3-RFI-SW-E-0375 00 KAIG3-RFI-SW-E-0375-00
KAIG3-RFI-PC-E-0374 00 KAIG3-RFI-PC-E-0374-00
KAIG3-RFI-PC-E-0373 00 KAIG3-RFI-PC-E-0373-00
KAIG3-RFI-PC-E-0372 00 KAIG3-RFI-PC-E-0372-00
KAIG3-RFI-PC-E-0371 00 KAIG3-RFI-PC-E-0371-00
KAIG3-RFI-WG-E-0370 00 KAIG3-RFI-WG-E-0370-00
KAIG3-RFI-CO-S-6023 01 KAIG3-RFI-CO-S-6023-01
KAIG3-RFI-CO-S-6024 01 KAIG3-RFI-CO-S-6024-01
KAIG3-RFI-CO-S-6170 01 KAIG3-RFI-CO-S-6170-01
KAIG3-RFI-CO-S-6178 01 KAIG3-RFI-CO-S-6178-01
KAIG3-RFI-CO-S-6179 01 KAIG3-RFI-CO-S-6179-01
KAIG3-RFI-CO-SS-0049 00 KAIG3-RFI-CO-SS-0049-00
KAIG3-RFI-CO-SU-2165 00 KAIG3-RFI-CO-SU-2165-00
KAIG3-RFI-MC-SU-2164 00 KAIG3-RFI-MC-SU-2164-00
KAIG3-RFI-CO-SU-2163 00 KAIG3-RFI-CO-SU-2163-00
KAIG3-RFI-CO-SU-2162 00 KAIG3-RFI-CO-SU-2162-00
KAIG3-RFI-CO-S-6295 00 KAIG3-RFI-CO-S-6295-00
KAIG3-RFI-CO-S-6296 00 KAIG3-RFI-CO-S-6296-00
KAIG3-RFI-CO-S-6275 00 KAIG3-RFI-CO-S-6275-00
KAIG3-RFI-CO-S-6276 00 KAIG3-RFI-CO-S-6276-00
KAIG3-RFI-CO-S-6277 00 KAIG3-RFI-CO-S-6277-00
KAIG3-RFI-CO-S-6278 00 KAIG3-RFI-CO-S-6278-00
KAIG3-RFI-CO-S-6279 00 KAIG3-RFI-CO-S-6279-00
KAIG3-RFI-MC-S-6290 00 KAIG3-RFI-MC-S-6290-00
KAIG3-RFI-MC-S-6291 00 KAIG3-RFI-MC-S-6291-00
KAIG3-RFI-MC-S-6292 00 KAIG3-RFI-MC-S-6292-00
KAIG3-RFI-CO-S-6293 00 KAIG3-RFI-CO-S-6293-00
KAIG3-RFI-CO-S-6294 00 KAIG3-RFI-CO-S-6294-00
KAIG3-RFI-SW-C-3252 00 KAIG3-RFI-SW-C-3252-00
KAIG3-RFI-SW-C-3256 00 KAIG3-RFI-SW-C-3256-00
KAIG3-RFI-SW-C-3255 00 KAIG3-RFI-SW-C-3255-00
KAIG3-RFI-SW-C-3254 00 KAIG3-RFI-SW-C-3254-00
KAIG3-RFI-SW-C-3253 00 KAIG3-RFI-SW-C-3253-00
KAIG3-RFI-SW-C-3251 00 KAIG3-RFI-SW-C-3251-00
KAIG3-RFI-PG-S-6274 00 KAIG3-RFI-PG-S-6274-00
KAIG3-RFI-SG-C-3239 00 KAIG3-RFI-SG-C-3239-00
KAIG3-RFI-SW-P-0187 00 KAIG3-RFI-SW-P-0187-00
KAIG3-RFI-TG-S-6273 00 KAIG3-RFI-TG-S-6273-00
KAIG3-RFI-DG-S-6272 00 KAIG3-RFI-DG-S-6272-00
KAIG3-RFI-DG-S-6271 00 KAIG3-RFI-DG-S-6271-00
KAIG3-RFI-DG-S-6270 00 KAIG3-RFI-DG-S-6270-00
KAIG3-RFI-SW-C-3248 00 KAIG3-RFI-SW-C-3248-00
KAIG3-RFI-SW-C-3247 00 KAIG3-RFI-SW-C-3247-00
KAIG3-RFI-SW-C-3246 00 KAIG3-RFI-SW-C-3246-00
KAIG3-RFI-SW-C-3245 00 KAIG3-RFI-SW-C-3245-00
KAIG3-RFI-SW-C-3243 00 KAIG3-RFI-SW-C-3243-00
KAIG3-RFI-WG-C-3152 01 KAIG3-RFI-WG-C-3152-01
KAIG3-RFI-SW-C-3242 00 KAIG3-RFI-SW-C-3242-00
KAIG3-RFI-SW-C-3241 00 KAIG3-RFI-SW-C-3241-00
KAIG3-RFI-SW-C-3240 00 KAIG3-RFI-SW-C-3240-00
KAIG3-RFI-PG-S-6269 00 KAIG3-RFI-PG-S-6269-00
KAIG3-RFI-SW-C-3233 00 KAIG3-RFI-SW-C-3233-00
KAIG3-RFI-CO-C-3250 00 KAIG3-RFI-CO-C-3250-00
KAIG3-RFI-MC-C-3249 00 KAIG3-RFI-MC-C-3249-00
KAIG3-RFI-MC-SU-2148 01 KAIG3-RFI-MC-SU-2148-01
KAIG3-RFI-CO-SU-2138 01 KAIG3-RFI-CO-SU-2138-01
KAIG3-RFI-CO-SU-2160 00 KAIG3-RFI-CO-SU-2160-00
KAIG3-RFI-CO-S-6201 01 KAIG3-RFI-CO-S-6201-01
KAIG3-RFI-CO-S-5852 01 KAIG3-RFI-CO-S-5852-01
KAIG3-RFI-MC-S-5613 02 KAIG3-RFI-MC-S-5613-02
KAIG3-RFI-CO-S-6256 00 KAIG3-RFI-CO-S-6256-00
KAIG3-RFI-PG-SU-2161 00 KAIG3-RFI-PG-SU-2161-00
KAIG3-RFI-AG-C-3223 00 KAIG3-RFI-AG-C-3223-00
KAIG3-RFI-PG-C-1308 01 KAIG3-RFI-PG-C-1308-01
KAIG3-RFI-PG-C-1277 01 KAIG3-RFI-PG-C-1277-01
KAIG3-RFI-PG-C-3238 00 KAIG3-RFI-PG-C-3238-00
KAIG3-RFI-ZG-C-3237 00 KAIG3-RFI-ZG-C-3237-00
KAIG3-RFI-ZG-S-6268 00 KAIG3-RFI-ZG-S-6268-00
KAIG3-RFI-TG-S-6267 00 KAIG3-RFI-TG-S-6267-00
KAIG3-RFI-TG-S-6266 00 KAIG3-RFI-TG-S-6266-00
KAIG3-RFI-TG-S-6265 00 KAIG3-RFI-TG-S-6265-00
KAIG3-RFI-ZG-C-3222 00 KAIG3-RFI-ZG-C-3222-00
KAIG3-RFI-PG-C-3083 01 KAIG3-RFI-PG-C-3083-01
KAIG3-RFI-WG-C-3151 01 KAIG3-RFI-WG-C-3151-01
KAIG3-RFI-SW-LS-1112 00 KAIG3-RFI-SW-LS-1112-00
KAIG3-RFI-SW-LS-1111 00 KAIG3-RFI-SW-LS-1111-00
KAIG3-RFI-SW-C-3232 00 KAIG3-RFI-SW-C-3232-00
KAIG3-RFI-SW-C-3231 00 KAIG3-RFI-SW-C-3231-00
KAIG3-RFI-SW-C-3230 00 KAIG3-RFI-SW-C-3230-00
KAIG3-RFI-SW-C-3229 00 KAIG3-RFI-SW-C-3229-00
KAIG3-RFI-SW-C-3228 00 KAIG3-RFI-SW-C-3228-00
KAIG3-RFI-SW-C-3227 00 KAIG3-RFI-SW-C-3227-00
KAIG3-RFI-SW-C-3226 00 KAIG3-RFI-SW-C-3226-00
KAIG3-RFI-SW-C-3225 00 KAIG3-RFI-SW-C-3225-00
KAIG3-RFI-CO-S-6212 00 KAIG3-RFI-CO-S-6212-00
KAIG3-RFI-CO-SU-2159 00 KAIG3-RFI-CO-SU-2159-00
KAIG3-RFI-CO-SU-2158 00 KAIG3-RFI-CO-SU-2158-00
KAIG3-RFI-CO-SS-0048 00 KAIG3-RFI-CO-SS-0048-00
KAIG3-RFI-CO-C-3236 00 KAIG3-RFI-CO-C-3236-00
KAIG3-RFI-MC-C-3235 00 KAIG3-RFI-MC-C-3235-00
KAIG3-RFI-CO-S-6259 00 KAIG3-RFI-CO-S-6259-00
KAIG3-RFI-CO-S-6260 00 KAIG3-RFI-CO-S-6260-00
KAIG3-RFI-CO-S-6261 00 KAIG3-RFI-CO-S-6261-00
KAIG3-RFI-CO-S-6263 00 KAIG3-RFI-CO-S-6263-00
KAIG3-RFI-CO-S-6264 00 KAIG3-RFI-CO-S-6264-00
KAIG3-RFI-CO-S-6253 00 KAIG3-RFI-CO-S-6253-00
KAIG3-RFI-CO-S-6254 00 KAIG3-RFI-CO-S-6254-00
KAIG3-RFI-CO-S-6255 00 KAIG3-RFI-CO-S-6255-00
KAIG3-RFI-CO-S-6257 00 KAIG3-RFI-CO-S-6257-00
KAIG3-RFI-MC-S-6258 00 KAIG3-RFI-MC-S-6258-00
KAIG3-RFI-WG-S-6252 00 KAIG3-RFI-WG-S-6252-00
KAIG3-RFI-SG-C-3221 00 KAIG3-RFI-SG-C-3221-00
KAIG3-RFI-SG-C-3201 00 KAIG3-RFI-SG-C-3201-00
KAIG3-RFI-WG-LS-1109 00 KAIG3-RFI-WG-LS-1109-00
KAIG3-RFI-WG-LS-1108 00 KAIG3-RFI-WG-LS-1108-00
KAIG3-RFI-WG-LS-1107 00 KAIG3-RFI-WG-LS-1107-00
KAIG3-RFI-WG-LS-1106 00 KAIG3-RFI-WG-LS-1106-00
KAIG3-RFI-WG-LS-1105 00 KAIG3-RFI-WG-LS-1105-00
KAIG3-RFI-WG-LS-1104 00 KAIG3-RFI-WG-LS-1104-00
KAIG3-RFI-WG-LS-1103 00 KAIG3-RFI-WG-LS-1103-00
KAIG3-RFI-WG-LS-1102 00 KAIG3-RFI-WG-LS-1102-00
KAIG3-RFI-MB-A-0736 00 KAIG3-RFI-MB-A-0736-00
KAIG3-RFI-MB-A-0735 00 KAIG3-RFI-MB-A-0735-00
KAIG3-RFI-MB-A-0734 00 KAIG3-RFI-MB-A-0734-00
KAIG3-RFI-PC-E-0369 00 KAIG3-RFI-PC-E-0369-00
KAIG3-RFI-PC-E-0368 00 KAIG3-RFI-PC-E-0368-00
KAIG3-RFI-PC-E-0367 00 KAIG3-RFI-PC-E-0367-00
KAIG3-RFI-CO-S-6231 00 KAIG3-RFI-CO-S-6231-00
KAIG3-RFI-CO-S-6232 00 KAIG3-RFI-CO-S-6232-00
KAIG3-RFI-SW-C-3218 00 KAIG3-RFI-SW-C-3218-00
KAIG3-RFI-CO-SU-2151 00 KAIG3-RFI-CO-SU-2151-00
KAIG3-RFI-SW-C-3217 00 KAIG3-RFI-SW-C-3217-00
KAIG3-RFI-SW-C-3216 00 KAIG3-RFI-SW-C-3216-00
KAIG3-RFI-CO-SU-2150 00 KAIG3-RFI-CO-SU-2150-00
KAIG3-RFI-SW-C-3215 00 KAIG3-RFI-SW-C-3215-00
KAIG3-RFI-SW-C-3214 00 KAIG3-RFI-SW-C-3214-00
KAIG3-RFI-SW-C-3213 00 KAIG3-RFI-SW-C-3213-00
KAIG3-RFI-SW-C-3212 00 KAIG3-RFI-SW-C-3212-00
KAIG3-RFI-SW-C-3211 00 KAIG3-RFI-SW-C-3211-00
KAIG3-RFI-CO-S-6233 00 KAIG3-RFI-CO-S-6233-00
KAIG3-RFI-SW-C-3210 00 KAIG3-RFI-SW-C-3210-00
KAIG3-RFI-SW-C-3209 00 KAIG3-RFI-SW-C-3209-00
KAIG3-RFI-CO-SS-0047 00 KAIG3-RFI-CO-SS-0047-00
KAIG3-RFI-SW-C-3208 00 KAIG3-RFI-SW-C-3208-00
KAIG3-RFI-SW-C-3207 00 KAIG3-RFI-SW-C-3207-00
KAIG3-RFI-SW-C-3206 00 KAIG3-RFI-SW-C-3206-00
KAIG3-RFI-CO-SU-2157 00 KAIG3-RFI-CO-SU-2157-00
KAIG3-RFI-CO-C-3219 00 KAIG3-RFI-CO-C-3219-00
KAIG3-RFI-CO-S-6169 01 KAIG3-RFI-CO-S-6169-01
KAIG3-RFI-CO-S-6189 01 KAIG3-RFI-CO-S-6189-01
KAIG3-RFI-CO-S-6188 01 KAIG3-RFI-CO-S-6188-01
KAIG3-RFI-MC-S-6098 01 KAIG3-RFI-MC-S-6098-01
KAIG3-RFI-MC-S-6133 01 KAIG3-RFI-MC-S-6133-01
KAIG3-RFI-MC-S-6148 01 KAIG3-RFI-MC-S-6148-01
KAIG3-RFI-CO-S-6247 00 KAIG3-RFI-CO-S-6247-00
KAIG3-RFI-CO-S-6248 00 KAIG3-RFI-CO-S-6248-00
KAIG3-RFI-CO-S-6249 00 KAIG3-RFI-CO-S-6249-00
KAIG3-RFI-CO-S-6250 00 KAIG3-RFI-CO-S-6250-00
KAIG3-RFI-CO-S-6251 00 KAIG3-RFI-CO-S-6251-00
KAIG3-RFI-TG-SU-2155 00 KAIG3-RFI-TG-SU-2155-00
KAIG3-RFI-TG-C-3184 00 KAIG3-RFI-TG-C-3184-00
KAIG3-RFI-SG-A-0733 00 KAIG3-RFI-SG-A-0733-00
KAIG3-RFI-PG-LS-1101 00 KAIG3-RFI-PG-LS-1101-00
KAIG3-RFI-PG-LS-1100 00 KAIG3-RFI-PG-LS-1100-00
KAIG3-RFI-ZG-LS-1099 00 KAIG3-RFI-ZG-LS-1099-00
KAIG3-RFI-ZG-LS-1098 00 KAIG3-RFI-ZG-LS-1098-00
KAIG3-RFI-TG-LS-1097 00 KAIG3-RFI-TG-LS-1097-00
KAIG3-RFI-DG-LS-1096 00 KAIG3-RFI-DG-LS-1096-00
KAIG3-RFI-DG-LS-1095 00 KAIG3-RFI-DG-LS-1095-00
KAIG3-RFI-AG-C-3183 00 KAIG3-RFI-AG-C-3183-00
KAIG3-RFI-WG-C-3035 01 KAIG3-RFI-WG-C-3035-01
KAIG3-RFI-SW-A-0702 01 KAIG3-RFI-SW-A-0702-01
KAIG3-RFI-WG-LS-1094 00 KAIG3-RFI-WG-LS-1094-00
KAIG3-RFI-SW-LS-1087 00 KAIG3-RFI-SW-LS-1087-00
KAIG3-RFI-SW-LS-1086 00 KAIG3-RFI-SW-LS-1086-00
KAIG3-RFI-SW-LS-1085 00 KAIG3-RFI-SW-LS-1085-00
KAIG3-RFI-SW-LS-1084 00 KAIG3-RFI-SW-LS-1084-00
KAIG3-RFI-SW-C-3205 00 KAIG3-RFI-SW-C-3205-00
KAIG3-RFI-SW-C-3204 00 KAIG3-RFI-SW-C-3204-00
KAIG3-RFI-SW-C-3203 00 KAIG3-RFI-SW-C-3203-00
KAIG3-RFI-SW-C-3202 00 KAIG3-RFI-SW-C-3202-00
KAIG3-RFI-SW-C-3198 00 KAIG3-RFI-SW-C-3198-00
KAIG3-RFI-SW-C-3197 00 KAIG3-RFI-SW-C-3197-00
KAIG3-RFI-SW-C-3196 00 KAIG3-RFI-SW-C-3196-00
KAIG3-RFI-SW-C-3195 00 KAIG3-RFI-SW-C-3195-00
KAIG3-RFI-SW-C-3194 00 KAIG3-RFI-SW-C-3194-00
KAIG3-RFI-SW-C-3193 00 KAIG3-RFI-SW-C-3193-00
KAIG3-RFI-SW-C-3192 00 KAIG3-RFI-SW-C-3192-00
KAIG3-RFI-SW-C-3191 00 KAIG3-RFI-SW-C-3191-00
KAIG3-RFI-SW-C-3190 00 KAIG3-RFI-SW-C-3190-00
KAIG3-RFI-SW-C-3189 00 KAIG3-RFI-SW-C-3189-00
KAIG3-RFI-SW-C-3188 00 KAIG3-RFI-SW-C-3188-00
KAIG3-RFI-SW-C-3187 00 KAIG3-RFI-SW-C-3187-00
KAIG3-RFI-SW-C-3186 00 KAIG3-RFI-SW-C-3186-00
KAIG3-RFI-SW-C-3185 00 KAIG3-RFI-SW-C-3185-00
KAIG3-RFI-CO-SU-2156 00 KAIG3-RFI-CO-SU-2156-00
KAIG3-RFI-CO-SU-2154 00 KAIG3-RFI-CO-SU-2154-00
KAIG3-RFI-CO-SU-2153 00 KAIG3-RFI-CO-SU-2153-00
KAIG3-RFI-CO-SU-2152 00 KAIG3-RFI-CO-SU-2152-00
KAIG3-RFI-CO-S-5896 01 KAIG3-RFI-CO-S-5896-01
KAIG3-RFI-CO-S-5898 01 KAIG3-RFI-CO-S-5898-01
KAIG3-RFI-CO-S-5892 01 KAIG3-RFI-CO-S-5892-01
KAIG3-RFI-CO-S-6246 00 KAIG3-RFI-CO-S-6246-00
KAIG3-RFI-CO-S-6239 00 KAIG3-RFI-CO-S-6239-00
KAIG3-RFI-CO-S-6240 00 KAIG3-RFI-CO-S-6240-00
KAIG3-RFI-CO-S-6241 00 KAIG3-RFI-CO-S-6241-00
KAIG3-RFI-CO-S-6242 00 KAIG3-RFI-CO-S-6242-00
KAIG3-RFI-CO-S-6243 00 KAIG3-RFI-CO-S-6243-00
KAIG3-RFI-MC-S-6244 00 KAIG3-RFI-MC-S-6244-00
KAIG3-RFI-CO-S-6234 00 KAIG3-RFI-CO-S-6234-00
KAIG3-RFI-CO-S-6235 00 KAIG3-RFI-CO-S-6235-00
KAIG3-RFI-SW-C-3200 00 KAIG3-RFI-SW-C-3200-00
KAIG3-RFI-SW-C-3199 00 KAIG3-RFI-SW-C-3199-00
KAIG3-RFI-CO-S-6236 00 KAIG3-RFI-CO-S-6236-00
KAIG3-RFI-CO-S-6237 00 KAIG3-RFI-CO-S-6237-00
KAIG3-RFI-CO-S-6238 00 KAIG3-RFI-CO-S-6238-00
KAIG3-RFI-WG-S-6230 00 KAIG3-RFI-WG-S-6230-00
KAIG3-RFI-ZG-C-3175 00 KAIG3-RFI-ZG-C-3175-00
KAIG3-RFI-DG-C-2898 01 KAIG3-RFI-DG-C-2898-01
KAIG3-RFI-WG-S-6124 01 KAIG3-RFI-WG-S-6124-01
KAIG3-RFI-AG-S-6229 00 KAIG3-RFI-AG-S-6229-00
KAIG3-RFI-AG-S-6228 00 KAIG3-RFI-AG-S-6228-00
KAIG3-RFI-WG-C-3155 00 KAIG3-RFI-WG-C-3155-00
KAIG3-RFI-ZG-S-6216 00 KAIG3-RFI-ZG-S-6216-00
KAIG3-RFI-WG-LS-1093 00 KAIG3-RFI-WG-LS-1093-00
KAIG3-RFI-WG-LS-1092 00 KAIG3-RFI-WG-LS-1092-00
KAIG3-RFI-WG-LS-1091 00 KAIG3-RFI-WG-LS-1091-00
KAIG3-RFI-WG-LS-1090 00 KAIG3-RFI-WG-LS-1090-00
KAIG3-RFI-MB-A-0732 00 KAIG3-RFI-MB-A-0732-00
KAIG3-RFI-SW-C-3182 00 KAIG3-RFI-SW-C-3182-00
KAIG3-RFI-SW-C-3181 00 KAIG3-RFI-SW-C-3181-00
KAIG3-RFI-PA-C-3180 00 KAIG3-RFI-PA-C-3180-00
KAIG3-RFI-PA-C-3179 00 KAIG3-RFI-PA-C-3179-00
KAIG3-RFI-PA-C-3178 00 KAIG3-RFI-PA-C-3178-00
KAIG3-RFI-SG-LC-0433 00 KAIG3-RFI-SG-LC-0433-00
KAIG3-RFI-SW-C-3177 00 KAIG3-RFI-SW-C-3177-00
KAIG3-RFI-SW-C-3176 00 KAIG3-RFI-SW-C-3176-00
KAIG3-RFI-SG-LC-0432 00 KAIG3-RFI-SG-LC-0432-00
KAIG3-RFI-SW-C-3173 00 KAIG3-RFI-SW-C-3173-00
KAIG3-RFI-SW-C-3172 00 KAIG3-RFI-SW-C-3172-00
KAIG3-RFI-SW-C-3171 00 KAIG3-RFI-SW-C-3171-00
KAIG3-RFI-SW-C-3170 00 KAIG3-RFI-SW-C-3170-00
KAIG3-RFI-SW-C-3169 00 KAIG3-RFI-SW-C-3169-00
KAIG3-RFI-SW-C-3168 00 KAIG3-RFI-SW-C-3168-00
KAIG3-RFI-CO-SU-2149 00 KAIG3-RFI-CO-SU-2149-00
KAIG3-RFI-CO-S-6227 00 KAIG3-RFI-CO-S-6227-00
KAIG3-RFI-CO-S-6226 00 KAIG3-RFI-CO-S-6226-00
KAIG3-RFI-CO-S-6141 01 KAIG3-RFI-CO-S-6141-01
KAIG3-RFI-CO-S-6153 01 KAIG3-RFI-CO-S-6153-01
KAIG3-RFI-CO-S-6109 01 KAIG3-RFI-CO-S-6109-01
KAIG3-RFI-CO-S-6143 01 KAIG3-RFI-CO-S-6143-01
KAIG3-RFI-CO-S-6139 01 KAIG3-RFI-CO-S-6139-01
KAIG3-RFI-CO-S-6135 01 KAIG3-RFI-CO-S-6135-01
KAIG3-RFI-CO-S-6136 01 KAIG3-RFI-CO-S-6136-01
KAIG3-RFI-CO-S-6137 01 KAIG3-RFI-CO-S-6137-01
KAIG3-RFI-CO-S-6217 00 KAIG3-RFI-CO-S-6217-00
KAIG3-RFI-CO-S-6218 00 KAIG3-RFI-CO-S-6218-00
KAIG3-RFI-CO-S-6219 00 KAIG3-RFI-CO-S-6219-00
KAIG3-RFI-CO-S-6220 00 KAIG3-RFI-CO-S-6220-00
KAIG3-RFI-CO-S-6221 00 KAIG3-RFI-CO-S-6221-00
KAIG3-RFI-CO-S-6222 00 KAIG3-RFI-CO-S-6222-00
KAIG3-RFI-CO-S-6223 00 KAIG3-RFI-CO-S-6223-00
KAIG3-RFI-CO-S-6224 00 KAIG3-RFI-CO-S-6224-00
KAIG3-RFI-CO-S-6225 00 KAIG3-RFI-CO-S-6225-00
KAIG3-RFI-SW-C-3167 00 KAIG3-RFI-SW-C-3167-00
KAIG3-RFI-SW-C-3165 00 KAIG3-RFI-SW-C-3165-00
KAIG3-RFI-SW-C-3163 00 KAIG3-RFI-SW-C-3163-00
KAIG3-RFI-PC-E-0366 00 KAIG3-RFI-PC-E-0366-00
KAIG3-RFI-PC-E-0365 00 KAIG3-RFI-PC-E-0365-00
KAIG3-RFI-PC-E-0364 00 KAIG3-RFI-PC-E-0364-00
KAIG3-RFI-SW-LC-0431 00 KAIG3-RFI-SW-LC-0431-00
KAIG3-RFI-ZG-S-6215 00 KAIG3-RFI-ZG-S-6215-00
KAIG3-RFI-SW-LC-0430 00 KAIG3-RFI-SW-LC-0430-00
KAIG3-RFI-PC-LC-0429 00 KAIG3-RFI-PC-LC-0429-00
KAIG3-RFI-PC-LC-0428 00 KAIG3-RFI-PC-LC-0428-00
KAIG3-RFI-PC-LC-0427 00 KAIG3-RFI-PC-LC-0427-00
KAIG3-RFI-PC-LC-0426 00 KAIG3-RFI-PC-LC-0426-00
KAIG3-RFI-PC-LC-0425 00 KAIG3-RFI-PC-LC-0425-00
KAIG3-RFI-PC-LC-0424 00 KAIG3-RFI-PC-LC-0424-00
KAIG3-RFI-ZG-S-6214 00 KAIG3-RFI-ZG-S-6214-00
KAIG3-RFI-PC-LC-0423 00 KAIG3-RFI-PC-LC-0423-00
KAIG3-RFI-ZG-S-6205 00 KAIG3-RFI-ZG-S-6205-00
KAIG3-RFI-SG-C-3154 00 KAIG3-RFI-SG-C-3154-00
KAIG3-RFI-PG-C-3153 00 KAIG3-RFI-PG-C-3153-00
KAIG3-RFI-WG-LS-1089 00 KAIG3-RFI-WG-LS-1089-00
KAIG3-RFI-WG-LS-1088 00 KAIG3-RFI-WG-LS-1088-00
KAIG3-RFI-CO-SU-2121 01 KAIG3-RFI-CO-SU-2121-01
KAIG3-RFI-CO-C-3156 00 KAIG3-RFI-CO-C-3156-00
KAIG3-RFI-MC-C-3174 00 KAIG3-RFI-MC-C-3174-00
KAIG3-RFI-CO-SS-0046 00 KAIG3-RFI-CO-SS-0046-00
KAIG3-RFI-CO-S-6213 00 KAIG3-RFI-CO-S-6213-00
KAIG3-RFI-CO-S-6211 00 KAIG3-RFI-CO-S-6211-00
KAIG3-RFI-NM-C-3159 00 KAIG3-RFI-NM-C-3159-00
KAIG3-RFI-MC-SU-2148 00 KAIG3-RFI-MC-SU-2148-00
KAIG3-RFI-CO-SU-2147 00 KAIG3-RFI-CO-SU-2147-00
KAIG3-RFI-SW-C-3147 00 KAIG3-RFI-SW-C-3147-00
KAIG3-RFI-SW-LS-1083 00 KAIG3-RFI-SW-LS-1083-00
KAIG3-RFI-SW-LS-1081 00 KAIG3-RFI-SW-LS-1081-00
KAIG3-RFI-SW-LS-1080 00 KAIG3-RFI-SW-LS-1080-00
KAIG3-RFI-SW-LS-1079 00 KAIG3-RFI-SW-LS-1079-00
KAIG3-RFI-SW-LS-1078 00 KAIG3-RFI-SW-LS-1078-00
KAIG3-RFI-SW-C-3166 00 KAIG3-RFI-SW-C-3166-00
KAIG3-RFI-SW-C-3164 00 KAIG3-RFI-SW-C-3164-00
KAIG3-RFI-WG-C-3152 00 KAIG3-RFI-WG-C-3152-00
KAIG3-RFI-SW-C-3162 00 KAIG3-RFI-SW-C-3162-00
KAIG3-RFI-WG-C-3151 00 KAIG3-RFI-WG-C-3151-00
KAIG3-RFI-SW-C-3161 00 KAIG3-RFI-SW-C-3161-00
KAIG3-RFI-SW-C-3160 00 KAIG3-RFI-SW-C-3160-00
KAIG3-RFI-MB-A-0731 00 KAIG3-RFI-MB-A-0731-00
KAIG3-RFI-SW-C-3158 00 KAIG3-RFI-SW-C-3158-00
KAIG3-RFI-SW-C-3157 00 KAIG3-RFI-SW-C-3157-00
KAIG3-RFI-PC-E-0363 00 KAIG3-RFI-PC-E-0363-00
KAIG3-RFI-SW-C-3150 00 KAIG3-RFI-SW-C-3150-00
KAIG3-RFI-SW-C-3149 00 KAIG3-RFI-SW-C-3149-00
KAIG3-RFI-SW-C-3148 00 KAIG3-RFI-SW-C-3148-00
KAIG3-RFI-PC-E-0362 00 KAIG3-RFI-PC-E-0362-00
KAIG3-RFI-ZG-C-3140 00 KAIG3-RFI-ZG-C-3140-00
KAIG3-RFI-PC-E-0361 00 KAIG3-RFI-PC-E-0361-00
KAIG3-RFI-SW-C-3146 00 KAIG3-RFI-SW-C-3146-00
KAIG3-RFI-ZG-C-3139 00 KAIG3-RFI-ZG-C-3139-00
KAIG3-RFI-SW-C-3145 00 KAIG3-RFI-SW-C-3145-00
KAIG3-RFI-AG-S-6196 00 KAIG3-RFI-AG-S-6196-00
KAIG3-RFI-CO-S-6191 00 KAIG3-RFI-CO-S-6191-00
KAIG3-RFI-SW-C-3144 00 KAIG3-RFI-SW-C-3144-00
KAIG3-RFI-AG-S-5190 01 KAIG3-RFI-AG-S-5190-01
KAIG3-RFI-SW-C-3143 00 KAIG3-RFI-SW-C-3143-00
KAIG3-RFI-PC-LC-0422 00 KAIG3-RFI-PC-LC-0422-00
KAIG3-RFI-AG-SS-0045 00 KAIG3-RFI-AG-SS-0045-00
KAIG3-RFI-PC-LC-0421 00 KAIG3-RFI-PC-LC-0421-00
KAIG3-RFI-CO-S-5303 01 KAIG3-RFI-CO-S-5303-01
KAIG3-RFI-AG-SU-2146 00 KAIG3-RFI-AG-SU-2146-00
KAIG3-RFI-PC-LC-0420 00 KAIG3-RFI-PC-LC-0420-00
KAIG3-RFI-CO-S-5300 01 KAIG3-RFI-CO-S-5300-01
KAIG3-RFI-PC-LC-0419 00 KAIG3-RFI-PC-LC-0419-00
KAIG3-RFI-MB-A-0730 00 KAIG3-RFI-MB-A-0730-00
KAIG3-RFI-MB-A-0729 00 KAIG3-RFI-MB-A-0729-00
KAIG3-RFI-PC-LC-0418 00 KAIG3-RFI-PC-LC-0418-00
KAIG3-RFI-PC-LC-0417 00 KAIG3-RFI-PC-LC-0417-00
KAIG3-RFI-CO-S-6202 00 KAIG3-RFI-CO-S-6202-00
KAIG3-RFI-WG-LS-1082 00 KAIG3-RFI-WG-LS-1082-00
KAIG3-RFI-PC-LC-0416 00 KAIG3-RFI-PC-LC-0416-00
KAIG3-RFI-MC-S-6203 00 KAIG3-RFI-MC-S-6203-00
KAIG3-RFI-MC-S-6204 00 KAIG3-RFI-MC-S-6204-00
KAIG3-RFI-CO-S-6197 00 KAIG3-RFI-CO-S-6197-00
KAIG3-RFI-CO-S-6198 00 KAIG3-RFI-CO-S-6198-00
KAIG3-RFI-CO-S-6199 00 KAIG3-RFI-CO-S-6199-00
KAIG3-RFI-CO-S-6200 00 KAIG3-RFI-CO-S-6200-00
KAIG3-RFI-CO-S-6201 00 KAIG3-RFI-CO-S-6201-00
KAIG3-RFI-SW-LS-1077 00 KAIG3-RFI-SW-LS-1077-00
KAIG3-RFI-SW-LS-1076 00 KAIG3-RFI-SW-LS-1076-00
KAIG3-RFI-SW-LC-0415 00 KAIG3-RFI-SW-LC-0415-00
KAIG3-RFI-SW-LC-0414 00 KAIG3-RFI-SW-LC-0414-00
KAIG3-RFI-MB-A-0728 00 KAIG3-RFI-MB-A-0728-00
KAIG3-RFI-PG-C-3138 00 KAIG3-RFI-PG-C-3138-00
KAIG3-RFI-SW-LS-1075 00 KAIG3-RFI-SW-LS-1075-00
KAIG3-RFI-SW-LS-1074 00 KAIG3-RFI-SW-LS-1074-00
KAIG3-RFI-WG-C-3137 00 KAIG3-RFI-WG-C-3137-00
KAIG3-RFI-ZG-C-3136 00 KAIG3-RFI-ZG-C-3136-00
KAIG3-RFI-SW-LS-0997 01 KAIG3-RFI-SW-LS-0997-01
KAIG3-RFI-ZG-C-3116 00 KAIG3-RFI-ZG-C-3116-00
KAIG3-RFI-ZG-S-6195 00 KAIG3-RFI-ZG-S-6195-00
KAIG3-RFI-SW-C-3142 00 KAIG3-RFI-SW-C-3142-00
KAIG3-RFI-ZG-S-6194 00 KAIG3-RFI-ZG-S-6194-00
KAIG3-RFI-SW-C-3141 00 KAIG3-RFI-SW-C-3141-00
KAIG3-RFI-WG-C-3115 00 KAIG3-RFI-WG-C-3115-00
KAIG3-RFI-SW-C-3135 00 KAIG3-RFI-SW-C-3135-00
KAIG3-RFI-SW-C-3134 00 KAIG3-RFI-SW-C-3134-00
KAIG3-RFI-SW-C-3133 00 KAIG3-RFI-SW-C-3133-00
KAIG3-RFI-SW-C-3132 00 KAIG3-RFI-SW-C-3132-00
KAIG3-RFI-SW-C-3131 00 KAIG3-RFI-SW-C-3131-00
KAIG3-RFI-SW-C-3130 00 KAIG3-RFI-SW-C-3130-00
KAIG3-RFI-SW-C-3129 00 KAIG3-RFI-SW-C-3129-00
KAIG3-RFI-SW-C-3128 00 KAIG3-RFI-SW-C-3128-00
KAIG3-RFI-SW-C-3125 00 KAIG3-RFI-SW-C-3125-00
KAIG3-RFI-SW-C-3124 00 KAIG3-RFI-SW-C-3124-00
KAIG3-RFI-PA-C-3123 00 KAIG3-RFI-PA-C-3123-00
KAIG3-RFI-PA-C-3122 00 KAIG3-RFI-PA-C-3122-00
KAIG3-RFI-SW-C-3121 00 KAIG3-RFI-SW-C-3121-00
KAIG3-RFI-SW-C-3120 00 KAIG3-RFI-SW-C-3120-00
KAIG3-RFI-SW-C-3119 00 KAIG3-RFI-SW-C-3119-00
KAIG3-RFI-SW-C-3118 00 KAIG3-RFI-SW-C-3118-00
KAIG3-RFI-SW-C-3117 00 KAIG3-RFI-SW-C-3117-00
KAIG3-RFI-CO-C-3126 00 KAIG3-RFI-CO-C-3126-00
KAIG3-RFI-MC-C-3127 00 KAIG3-RFI-MC-C-3127-00
KAIG3-RFI-CO-SS-0044 00 KAIG3-RFI-CO-SS-0044-00
KAIG3-RFI-CO-SU-2145 00 KAIG3-RFI-CO-SU-2145-00
KAIG3-RFI-CO-S-6111 01 KAIG3-RFI-CO-S-6111-01
KAIG3-RFI-CO-S-6112 01 KAIG3-RFI-CO-S-6112-01
KAIG3-RFI-CO-S-6192 00 KAIG3-RFI-CO-S-6192-00
KAIG3-RFI-CO-S-6193 00 KAIG3-RFI-CO-S-6193-00
KAIG3-RFI-WG-LS-1072 00 KAIG3-RFI-WG-LS-1072-00
KAIG3-RFI-WG-LS-1071 00 KAIG3-RFI-WG-LS-1071-00
KAIG3-RFI-WG-C-3114 00 KAIG3-RFI-WG-C-3114-00
KAIG3-RFI-WG-LS-1070 00 KAIG3-RFI-WG-LS-1070-00
KAIG3-RFI-WG-LS-1069 00 KAIG3-RFI-WG-LS-1069-00
KAIG3-RFI-WG-LS-1068 00 KAIG3-RFI-WG-LS-1068-00
KAIG3-RFI-WG-C-3113 00 KAIG3-RFI-WG-C-3113-00
KAIG3-RFI-ZG-C-3112 00 KAIG3-RFI-ZG-C-3112-00
KAIG3-RFI-WG-C-3111 00 KAIG3-RFI-WG-C-3111-00
KAIG3-RFI-ZG-LS-1067 00 KAIG3-RFI-ZG-LS-1067-00
KAIG3-RFI-ZG-C-3110 00 KAIG3-RFI-ZG-C-3110-00
KAIG3-RFI-ZG-C-3109 00 KAIG3-RFI-ZG-C-3109-00
KAIG3-RFI-SG-C-3108 00 KAIG3-RFI-SG-C-3108-00
KAIG3-RFI-SG-C-3084 00 KAIG3-RFI-SG-C-3084-00
KAIG3-RFI-WG-C-2807 01 KAIG3-RFI-WG-C-2807-01
KAIG3-RFI-WG-LS-1066 00 KAIG3-RFI-WG-LS-1066-00
KAIG3-RFI-WG-LS-1065 00 KAIG3-RFI-WG-LS-1065-00
KAIG3-RFI-WG-LS-1064 00 KAIG3-RFI-WG-LS-1064-00
KAIG3-RFI-WG-LS-1061 00 KAIG3-RFI-WG-LS-1061-00
KAIG3-RFI-WG-LS-1060 00 KAIG3-RFI-WG-LS-1060-00
KAIG3-RFI-WG-LS-1059 00 KAIG3-RFI-WG-LS-1059-00
KAIG3-RFI-WG-LS-1058 00 KAIG3-RFI-WG-LS-1058-00
KAIG3-RFI-WG-LS-1057 00 KAIG3-RFI-WG-LS-1057-00
KAIG3-RFI-SW-LS-1073 00 KAIG3-RFI-SW-LS-1073-00
KAIG3-RFI-SW-LS-1063 00 KAIG3-RFI-SW-LS-1063-00
KAIG3-RFI-SW-C-3103 00 KAIG3-RFI-SW-C-3103-00
KAIG3-RFI-SW-C-3102 00 KAIG3-RFI-SW-C-3102-00
KAIG3-RFI-SW-C-3101 00 KAIG3-RFI-SW-C-3101-00
KAIG3-RFI-SW-C-3100 00 KAIG3-RFI-SW-C-3100-00
KAIG3-RFI-SW-C-3099 00 KAIG3-RFI-SW-C-3099-00
KAIG3-RFI-SW-C-3098 00 KAIG3-RFI-SW-C-3098-00
KAIG3-RFI-SW-C-3097 00 KAIG3-RFI-SW-C-3097-00
KAIG3-RFI-SW-C-3096 00 KAIG3-RFI-SW-C-3096-00
KAIG3-RFI-SW-C-3095 00 KAIG3-RFI-SW-C-3095-00
KAIG3-RFI-SW-C-3094 00 KAIG3-RFI-SW-C-3094-00
KAIG3-RFI-SW-C-3093 00 KAIG3-RFI-SW-C-3093-00
KAIG3-RFI-SW-C-3092 00 KAIG3-RFI-SW-C-3092-00
KAIG3-RFI-SW-C-3091 00 KAIG3-RFI-SW-C-3091-00
KAIG3-RFI-SW-C-3090 00 KAIG3-RFI-SW-C-3090-00
KAIG3-RFI-SW-C-3089 00 KAIG3-RFI-SW-C-3089-00
KAIG3-RFI-SW-C-3088 00 KAIG3-RFI-SW-C-3088-00
KAIG3-RFI-SW-C-3087 00 KAIG3-RFI-SW-C-3087-00
KAIG3-RFI-SW-C-3086 00 KAIG3-RFI-SW-C-3086-00
KAIG3-RFI-SW-C-3085 00 KAIG3-RFI-SW-C-3085-00
KAIG3-RFI-SW-P-0186 00 KAIG3-RFI-SW-P-0186-00
KAIG3-RFI-AG-LC-0413 00 KAIG3-RFI-AG-LC-0413-00
KAIG3-RFI-CO-S-6043 01 KAIG3-RFI-CO-S-6043-01
KAIG3-RFI-CO-S-6064 01 KAIG3-RFI-CO-S-6064-01
KAIG3-RFI-CO-S-6062 01 KAIG3-RFI-CO-S-6062-01
KAIG3-RFI-CO-S-6071 01 KAIG3-RFI-CO-S-6071-01
KAIG3-RFI-CO-S-6070 01 KAIG3-RFI-CO-S-6070-01
KAIG3-RFI-CO-S-6035 01 KAIG3-RFI-CO-S-6035-01
KAIG3-RFI-CO-S-6044 01 KAIG3-RFI-CO-S-6044-01
KAIG3-RFI-CO-SS-0040 01 KAIG3-RFI-CO-SS-0040-01
KAIG3-RFI-CO-C-3107 00 KAIG3-RFI-CO-C-3107-00
KAIG3-RFI-CO-C-3104 00 KAIG3-RFI-CO-C-3104-00
KAIG3-RFI-CO-C-3105 00 KAIG3-RFI-CO-C-3105-00
KAIG3-RFI-MC-C-3106 00 KAIG3-RFI-MC-C-3106-00
KAIG3-RFI-CO-SU-2144 00 KAIG3-RFI-CO-SU-2144-00
KAIG3-RFI-CO-SU-2142 00 KAIG3-RFI-CO-SU-2142-00
KAIG3-RFI-CO-SU-2143 00 KAIG3-RFI-CO-SU-2143-00
KAIG3-RFI-CO-S-6163 00 KAIG3-RFI-CO-S-6163-00
KAIG3-RFI-CO-S-6190 00 KAIG3-RFI-CO-S-6190-00
KAIG3-RFI-CO-S-6188 00 KAIG3-RFI-CO-S-6188-00
KAIG3-RFI-SW-E-0360 00 KAIG3-RFI-SW-E-0360-00
KAIG3-RFI-CO-S-6189 00 KAIG3-RFI-CO-S-6189-00
KAIG3-RFI-CO-S-6086 00 KAIG3-RFI-CO-S-6086-00
KAIG3-RFI-CO-S-6087 00 KAIG3-RFI-CO-S-6087-00
KAIG3-RFI-CO-S-6088 00 KAIG3-RFI-CO-S-6088-00
KAIG3-RFI-CO-S-6099 00 KAIG3-RFI-CO-S-6099-00
KAIG3-RFI-CO-SU-2107 01 KAIG3-RFI-CO-SU-2107-01
KAIG3-RFI-WG-LS-1056 00 KAIG3-RFI-WG-LS-1056-00
KAIG3-RFI-WG-LS-1051 00 KAIG3-RFI-WG-LS-1051-00
KAIG3-RFI-WG-LS-1050 00 KAIG3-RFI-WG-LS-1050-00
KAIG3-RFI-PG-C-3083 00 KAIG3-RFI-PG-C-3083-00
KAIG3-RFI-PG-C-3082 00 KAIG3-RFI-PG-C-3082-00
KAIG3-RFI-WG-S-6183 00 KAIG3-RFI-WG-S-6183-00
KAIG3-RFI-WG-LS-1049 00 KAIG3-RFI-WG-LS-1049-00
KAIG3-RFI-WG-C-3081 00 KAIG3-RFI-WG-C-3081-00
KAIG3-RFI-WG-C-3066 00 KAIG3-RFI-WG-C-3066-00
KAIG3-RFI-WG-LS-1048 00 KAIG3-RFI-WG-LS-1048-00
KAIG3-RFI-WG-C-3065 00 KAIG3-RFI-WG-C-3065-00
KAIG3-RFI-WG-C-3064 00 KAIG3-RFI-WG-C-3064-00
KAIG3-RFI-SW-LS-1062 00 KAIG3-RFI-SW-LS-1062-00
KAIG3-RFI-SW-LS-1055 00 KAIG3-RFI-SW-LS-1055-00
KAIG3-RFI-SW-LS-1054 00 KAIG3-RFI-SW-LS-1054-00
KAIG3-RFI-SW-LS-0999 01 KAIG3-RFI-SW-LS-0999-01
KAIG3-RFI-SW-C-3080 00 KAIG3-RFI-SW-C-3080-00
KAIG3-RFI-SW-C-3079 00 KAIG3-RFI-SW-C-3079-00
KAIG3-RFI-SW-C-3078 00 KAIG3-RFI-SW-C-3078-00
KAIG3-RFI-SW-C-3077 00 KAIG3-RFI-SW-C-3077-00
KAIG3-RFI-SW-C-3076 00 KAIG3-RFI-SW-C-3076-00
KAIG3-RFI-SW-C-3075 00 KAIG3-RFI-SW-C-3075-00
KAIG3-RFI-SW-C-3074 00 KAIG3-RFI-SW-C-3074-00
KAIG3-RFI-SW-C-3073 00 KAIG3-RFI-SW-C-3073-00
KAIG3-RFI-SW-C-3072 00 KAIG3-RFI-SW-C-3072-00
KAIG3-RFI-SW-C-3071 00 KAIG3-RFI-SW-C-3071-00
KAIG3-RFI-SW-C-3070 00 KAIG3-RFI-SW-C-3070-00
KAIG3-RFI-SW-C-3069 00 KAIG3-RFI-SW-C-3069-00
KAIG3-RFI-SW-C-3068 00 KAIG3-RFI-SW-C-3068-00
KAIG3-RFI-CO-SS-0043 00 KAIG3-RFI-CO-SS-0043-00
KAIG3-RFI-CO-SU-2140 00 KAIG3-RFI-CO-SU-2140-00
KAIG3-RFI-CO-SU-2141 00 KAIG3-RFI-CO-SU-2141-00
KAIG3-RFI-CO-S-6171 00 KAIG3-RFI-CO-S-6171-00
KAIG3-RFI-CO-S-6176 00 KAIG3-RFI-CO-S-6176-00
KAIG3-RFI-CO-S-6177 00 KAIG3-RFI-CO-S-6177-00
KAIG3-RFI-CO-S-6178 00 KAIG3-RFI-CO-S-6178-00
KAIG3-RFI-CO-S-6179 00 KAIG3-RFI-CO-S-6179-00
KAIG3-RFI-MC-S-6167 00 KAIG3-RFI-MC-S-6167-00
KAIG3-RFI-MC-S-6168 00 KAIG3-RFI-MC-S-6168-00
KAIG3-RFI-MC-S-6180 00 KAIG3-RFI-MC-S-6180-00
KAIG3-RFI-CO-S-6061 00 KAIG3-RFI-CO-S-6061-00
KAIG3-RFI-MC-S-6182 00 KAIG3-RFI-MC-S-6182-00
KAIG3-RFI-CO-S-6184 00 KAIG3-RFI-CO-S-6184-00
KAIG3-RFI-CO-S-6185 00 KAIG3-RFI-CO-S-6185-00
KAIG3-RFI-CO-S-6186 00 KAIG3-RFI-CO-S-6186-00
KAIG3-RFI-CO-S-6187 00 KAIG3-RFI-CO-S-6187-00
KAIG3-RFI-MC-S-6181 00 KAIG3-RFI-MC-S-6181-00
KAIG3-RFI-SG-C-3063 00 KAIG3-RFI-SG-C-3063-00
KAIG3-RFI-SG-C-3058 00 KAIG3-RFI-SG-C-3058-00
KAIG3-RFI-ZG-C-3057 00 KAIG3-RFI-ZG-C-3057-00
KAIG3-RFI-ZG-C-3056 00 KAIG3-RFI-ZG-C-3056-00
KAIG3-RFI-AG-S-6175 00 KAIG3-RFI-AG-S-6175-00
KAIG3-RFI-WG-C-3037 00 KAIG3-RFI-WG-C-3037-00
KAIG3-RFI-WG-LS-1044 00 KAIG3-RFI-WG-LS-1044-00
KAIG3-RFI-WG-LS-1043 00 KAIG3-RFI-WG-LS-1043-00
KAIG3-RFI-MB-A-0727 00 KAIG3-RFI-MB-A-0727-00
KAIG3-RFI-SG-C-2925 01 KAIG3-RFI-SG-C-2925-01
KAIG3-RFI-WG-C-3036 00 KAIG3-RFI-WG-C-3036-00
KAIG3-RFI-WG-C-3035 00 KAIG3-RFI-WG-C-3035-00
KAIG3-RFI-MC-C-3049 00 KAIG3-RFI-MC-C-3049-00
KAIG3-RFI-CO-SU-2139 00 KAIG3-RFI-CO-SU-2139-00
KAIG3-RFI-CO-SU-2138 00 KAIG3-RFI-CO-SU-2138-00
KAIG3-RFI-MC-C-2998 00 KAIG3-RFI-MC-C-2998-00
KAIG3-RFI-SW-C-3067 00 KAIG3-RFI-SW-C-3067-00
KAIG3-RFI-CO-S-6172 00 KAIG3-RFI-CO-S-6172-00
KAIG3-RFI-CO-S-6173 00 KAIG3-RFI-CO-S-6173-00
KAIG3-RFI-MC-S-6174 00 KAIG3-RFI-MC-S-6174-00
KAIG3-RFI-CO-S-6128 00 KAIG3-RFI-CO-S-6128-00
KAIG3-RFI-MC-S-6110 01 KAIG3-RFI-MC-S-6110-01
KAIG3-RFI-CO-S-6164 00 KAIG3-RFI-CO-S-6164-00
KAIG3-RFI-CO-S-6165 00 KAIG3-RFI-CO-S-6165-00
KAIG3-RFI-CO-S-6166 00 KAIG3-RFI-CO-S-6166-00
KAIG3-RFI-CO-S-6169 00 KAIG3-RFI-CO-S-6169-00
KAIG3-RFI-CO-S-6170 00 KAIG3-RFI-CO-S-6170-00
KAIG3-RFI-SW-C-3062 00 KAIG3-RFI-SW-C-3062-00
KAIG3-RFI-SW-C-3061 00 KAIG3-RFI-SW-C-3061-00
KAIG3-RFI-SW-LS-1053 00 KAIG3-RFI-SW-LS-1053-00
KAIG3-RFI-SW-LS-1052 00 KAIG3-RFI-SW-LS-1052-00
KAIG3-RFI-SW-LS-1047 00 KAIG3-RFI-SW-LS-1047-00
KAIG3-RFI-SW-LS-1046 00 KAIG3-RFI-SW-LS-1046-00
KAIG3-RFI-SW-C-3060 00 KAIG3-RFI-SW-C-3060-00
KAIG3-RFI-SW-C-3059 00 KAIG3-RFI-SW-C-3059-00
KAIG3-RFI-SW-C-3055 00 KAIG3-RFI-SW-C-3055-00
KAIG3-RFI-SW-C-3054 00 KAIG3-RFI-SW-C-3054-00
KAIG3-RFI-SW-C-3053 00 KAIG3-RFI-SW-C-3053-00
KAIG3-RFI-SW-C-3052 00 KAIG3-RFI-SW-C-3052-00
KAIG3-RFI-SW-C-3051 00 KAIG3-RFI-SW-C-3051-00
KAIG3-RFI-SW-C-3047 00 KAIG3-RFI-SW-C-3047-00
KAIG3-RFI-SW-C-3046 00 KAIG3-RFI-SW-C-3046-00
KAIG3-RFI-SW-C-3045 00 KAIG3-RFI-SW-C-3045-00
KAIG3-RFI-SW-C-3044 00 KAIG3-RFI-SW-C-3044-00
KAIG3-RFI-SW-LS-1045 00 KAIG3-RFI-SW-LS-1045-00
KAIG3-RFI-SW-LS-1041 00 KAIG3-RFI-SW-LS-1041-00
KAIG3-RFI-SW-LS-1040 00 KAIG3-RFI-SW-LS-1040-00
KAIG3-RFI-SW-LS-1039 00 KAIG3-RFI-SW-LS-1039-00
KAIG3-RFI-SW-LS-1038 00 KAIG3-RFI-SW-LS-1038-00
KAIG3-RFI-SW-LS-1037 00 KAIG3-RFI-SW-LS-1037-00
KAIG3-RFI-SW-C-3043 00 KAIG3-RFI-SW-C-3043-00
KAIG3-RFI-SW-C-3042 00 KAIG3-RFI-SW-C-3042-00
KAIG3-RFI-SW-C-3041 00 KAIG3-RFI-SW-C-3041-00
KAIG3-RFI-SW-C-3040 00 KAIG3-RFI-SW-C-3040-00
KAIG3-RFI-SW-C-3039 00 KAIG3-RFI-SW-C-3039-00
KAIG3-RFI-SW-C-3038 00 KAIG3-RFI-SW-C-3038-00
KAIG3-RFI-SW-C-3020 00 KAIG3-RFI-SW-C-3020-00
KAIG3-RFI-SW-C-3019 00 KAIG3-RFI-SW-C-3019-00
KAIG3-RFI-SW-C-3018 00 KAIG3-RFI-SW-C-3018-00
KAIG3-RFI-SW-C-3017 00 KAIG3-RFI-SW-C-3017-00
KAIG3-RFI-SW-C-3016 00 KAIG3-RFI-SW-C-3016-00
KAIG3-RFI-SW-C-3015 00 KAIG3-RFI-SW-C-3015-00
KAIG3-RFI-SW-C-3014 00 KAIG3-RFI-SW-C-3014-00
KAIG3-RFI-SW-C-3013 00 KAIG3-RFI-SW-C-3013-00
KAIG3-RFI-SW-C-3012 00 KAIG3-RFI-SW-C-3012-00
KAIG3-RFI-SW-C-3011 00 KAIG3-RFI-SW-C-3011-00
KAIG3-RFI-CO-SS-0042 00 KAIG3-RFI-CO-SS-0042-00
KAIG3-RFI-CO-C-3048 00 KAIG3-RFI-CO-C-3048-00
KAIG3-RFI-CO-C-3050 00 KAIG3-RFI-CO-C-3050-00
KAIG3-RFI-CO-C-2988 00 KAIG3-RFI-CO-C-2988-00
KAIG3-RFI-CO-SU-2137 00 KAIG3-RFI-CO-SU-2137-00
KAIG3-RFI-LM-SU-2136 00 KAIG3-RFI-LM-SU-2136-00
KAIG3-RFI-CO-SU-2135 00 KAIG3-RFI-CO-SU-2135-00
KAIG3-RFI-CO-S-6162 00 KAIG3-RFI-CO-S-6162-00
KAIG3-RFI-CO-S-6161 00 KAIG3-RFI-CO-S-6161-00
KAIG3-RFI-LM-S-6158 00 KAIG3-RFI-LM-S-6158-00
KAIG3-RFI-CO-S-6153 00 KAIG3-RFI-CO-S-6153-00
KAIG3-RFI-CO-S-6154 00 KAIG3-RFI-CO-S-6154-00
KAIG3-RFI-CO-S-6155 00 KAIG3-RFI-CO-S-6155-00
KAIG3-RFI-MC-S-6098 00 KAIG3-RFI-MC-S-6098-00
KAIG3-RFI-LM-S-6156 00 KAIG3-RFI-LM-S-6156-00
KAIG3-RFI-LM-S-6157 00 KAIG3-RFI-LM-S-6157-00
KAIG3-RFI-WG-LS-1042 00 KAIG3-RFI-WG-LS-1042-00
KAIG3-RFI-WG-C-2547 01 KAIG3-RFI-WG-C-2547-01
KAIG3-RFI-WG-C-3034 00 KAIG3-RFI-WG-C-3034-00
KAIG3-RFI-ZG-C-3033 00 KAIG3-RFI-ZG-C-3033-00
KAIG3-RFI-ZG-C-3032 00 KAIG3-RFI-ZG-C-3032-00
KAIG3-RFI-ZG-C-3031 00 KAIG3-RFI-ZG-C-3031-00
KAIG3-RFI-AG-S-6160 00 KAIG3-RFI-AG-S-6160-00
KAIG3-RFI-AG-S-6065 01 KAIG3-RFI-AG-S-6065-01
KAIG3-RFI-AG-S-6159 00 KAIG3-RFI-AG-S-6159-00
KAIG3-RFI-WG-C-3030 00 KAIG3-RFI-WG-C-3030-00
KAIG3-RFI-WG-C-3029 00 KAIG3-RFI-WG-C-3029-00
KAIG3-RFI-WG-C-3028 00 KAIG3-RFI-WG-C-3028-00
KAIG3-RFI-WG-C-3027 00 KAIG3-RFI-WG-C-3027-00
KAIG3-RFI-WG-C-3004 00 KAIG3-RFI-WG-C-3004-00
KAIG3-RFI-WG-C-3003 00 KAIG3-RFI-WG-C-3003-00
KAIG3-RFI-PG-C-3002 00 KAIG3-RFI-PG-C-3002-00
KAIG3-RFI-PG-C-3001 00 KAIG3-RFI-PG-C-3001-00
KAIG3-RFI-PG-C-3000 00 KAIG3-RFI-PG-C-3000-00
KAIG3-RFI-PG-C-2992 00 KAIG3-RFI-PG-C-2992-00
KAIG3-RFI-SG-C-2991 00 KAIG3-RFI-SG-C-2991-00
KAIG3-RFI-WG-S-6076 01 KAIG3-RFI-WG-S-6076-01
KAIG3-RFI-AG-S-6054 01 KAIG3-RFI-AG-S-6054-01
KAIG3-RFI-AG-S-6152 00 KAIG3-RFI-AG-S-6152-00
KAIG3-RFI-WG-SU-2124 00 KAIG3-RFI-WG-SU-2124-00
KAIG3-RFI-WG-C-2677 01 KAIG3-RFI-WG-C-2677-01
KAIG3-RFI-SW-C-3026 00 KAIG3-RFI-SW-C-3026-00
KAIG3-RFI-SW-C-3025 00 KAIG3-RFI-SW-C-3025-00
KAIG3-RFI-SW-C-3024 00 KAIG3-RFI-SW-C-3024-00
KAIG3-RFI-SW-C-3023 00 KAIG3-RFI-SW-C-3023-00
KAIG3-RFI-SW-C-3022 00 KAIG3-RFI-SW-C-3022-00
KAIG3-RFI-SW-C-3021 00 KAIG3-RFI-SW-C-3021-00
KAIG3-RFI-SW-LS-1036 00 KAIG3-RFI-SW-LS-1036-00
KAIG3-RFI-SW-LS-1035 00 KAIG3-RFI-SW-LS-1035-00
KAIG3-RFI-SW-LS-1034 00 KAIG3-RFI-SW-LS-1034-00
KAIG3-RFI-SW-LS-1033 00 KAIG3-RFI-SW-LS-1033-00
KAIG3-RFI-SW-LS-1032 00 KAIG3-RFI-SW-LS-1032-00
KAIG3-RFI-SW-LS-1031 00 KAIG3-RFI-SW-LS-1031-00
KAIG3-RFI-SW-LS-1030 00 KAIG3-RFI-SW-LS-1030-00
KAIG3-RFI-SW-C-3010 00 KAIG3-RFI-SW-C-3010-00
KAIG3-RFI-SW-C-3009 00 KAIG3-RFI-SW-C-3009-00
KAIG3-RFI-SW-C-3008 00 KAIG3-RFI-SW-C-3008-00
KAIG3-RFI-SW-C-3007 00 KAIG3-RFI-SW-C-3007-00
KAIG3-RFI-SW-C-3006 00 KAIG3-RFI-SW-C-3006-00
KAIG3-RFI-SW-C-3005 00 KAIG3-RFI-SW-C-3005-00
KAIG3-RFI-SW-C-3004 00 KAIG3-RFI-SW-C-3004-00
KAIG3-RFI-SW-C-3003 00 KAIG3-RFI-SW-C-3003-00
KAIG3-RFI-SW-C-3002 00 KAIG3-RFI-SW-C-3002-00
KAIG3-RFI-SW-C-3001 00 KAIG3-RFI-SW-C-3001-00
KAIG3-RFI-SW-C-3000 00 KAIG3-RFI-SW-C-3000-00
KAIG3-RFI-SW-C-2996 00 KAIG3-RFI-SW-C-2996-00
KAIG3-RFI-SW-C-2995 00 KAIG3-RFI-SW-C-2995-00
KAIG3-RFI-SW-C-2994 00 KAIG3-RFI-SW-C-2994-00
KAIG3-RFI-SW-C-2993 00 KAIG3-RFI-SW-C-2993-00
KAIG3-RFI-SW-C-2985 00 KAIG3-RFI-SW-C-2985-00
KAIG3-RFI-SW-C-2984 00 KAIG3-RFI-SW-C-2984-00
KAIG3-RFI-SW-C-2976 00 KAIG3-RFI-SW-C-2976-00
KAIG3-RFI-CO-C-2997 00 KAIG3-RFI-CO-C-2997-00
KAIG3-RFI-LM-C-2999 00 KAIG3-RFI-LM-C-2999-00
KAIG3-RFI-MC-SU-2123 00 KAIG3-RFI-MC-SU-2123-00
KAIG3-RFI-MC-SU-2133 00 KAIG3-RFI-MC-SU-2133-00
KAIG3-RFI-LM-SU-2134 00 KAIG3-RFI-LM-SU-2134-00
KAIG3-RFI-MC-S-6031 01 KAIG3-RFI-MC-S-6031-01
KAIG3-RFI-MC-S-6050 01 KAIG3-RFI-MC-S-6050-01
KAIG3-RFI-MC-S-6069 01 KAIG3-RFI-MC-S-6069-01
KAIG3-RFI-MC-S-6147 00 KAIG3-RFI-MC-S-6147-00
KAIG3-RFI-MC-S-6148 00 KAIG3-RFI-MC-S-6148-00
KAIG3-RFI-LM-S-6149 00 KAIG3-RFI-LM-S-6149-00
KAIG3-RFI-LM-S-6150 00 KAIG3-RFI-LM-S-6150-00
KAIG3-RFI-LM-S-6151 00 KAIG3-RFI-LM-S-6151-00
KAIG3-RFI-CO-S-5843 00 KAIG3-RFI-CO-S-5843-00
KAIG3-RFI-SW-LS-1029 00 KAIG3-RFI-SW-LS-1029-00
KAIG3-RFI-SW-LS-1028 00 KAIG3-RFI-SW-LS-1028-00
KAIG3-RFI-CO-C-2986 00 KAIG3-RFI-CO-C-2986-00
KAIG3-RFI-SW-LS-1027 00 KAIG3-RFI-SW-LS-1027-00
KAIG3-RFI-CO-C-2987 00 KAIG3-RFI-CO-C-2987-00
KAIG3-RFI-SW-C-2983 00 KAIG3-RFI-SW-C-2983-00
KAIG3-RFI-MC-C-2989 00 KAIG3-RFI-MC-C-2989-00
KAIG3-RFI-SW-C-2982 00 KAIG3-RFI-SW-C-2982-00
KAIG3-RFI-SW-C-2981 00 KAIG3-RFI-SW-C-2981-00
KAIG3-RFI-PA-C-2980 00 KAIG3-RFI-PA-C-2980-00
KAIG3-RFI-LM-C-2990 00 KAIG3-RFI-LM-C-2990-00
KAIG3-RFI-CO-SS-0041 00 KAIG3-RFI-CO-SS-0041-00
KAIG3-RFI-CO-SU-2132 00 KAIG3-RFI-CO-SU-2132-00
KAIG3-RFI-PA-C-2977 00 KAIG3-RFI-PA-C-2977-00
KAIG3-RFI-CO-SU-2130 00 KAIG3-RFI-CO-SU-2130-00
KAIG3-RFI-SW-C-2979 00 KAIG3-RFI-SW-C-2979-00
KAIG3-RFI-CO-SU-2131 00 KAIG3-RFI-CO-SU-2131-00
KAIG3-RFI-SW-C-2978 00 KAIG3-RFI-SW-C-2978-00
KAIG3-RFI-AG-S-6146 00 KAIG3-RFI-AG-S-6146-00
KAIG3-RFI-SW-C-2975 00 KAIG3-RFI-SW-C-2975-00
KAIG3-RFI-CO-SU-2128 00 KAIG3-RFI-CO-SU-2128-00
KAIG3-RFI-AG-S-6145 00 KAIG3-RFI-AG-S-6145-00
KAIG3-RFI-CO-SU-2129 00 KAIG3-RFI-CO-SU-2129-00
KAIG3-RFI-SG-C-2968 00 KAIG3-RFI-SG-C-2968-00
KAIG3-RFI-SW-C-2974 00 KAIG3-RFI-SW-C-2974-00
KAIG3-RFI-CO-S-6142 00 KAIG3-RFI-CO-S-6142-00
KAIG3-RFI-AG-S-6144 00 KAIG3-RFI-AG-S-6144-00
KAIG3-RFI-SW-C-2973 00 KAIG3-RFI-SW-C-2973-00
KAIG3-RFI-SW-C-2972 00 KAIG3-RFI-SW-C-2972-00
KAIG3-RFI-WG-C-2967 00 KAIG3-RFI-WG-C-2967-00
KAIG3-RFI-CO-S-6143 00 KAIG3-RFI-CO-S-6143-00
KAIG3-RFI-SW-C-2971 00 KAIG3-RFI-SW-C-2971-00
KAIG3-RFI-SW-C-2970 00 KAIG3-RFI-SW-C-2970-00
KAIG3-RFI-CO-S-6139 00 KAIG3-RFI-CO-S-6139-00
KAIG3-RFI-SW-C-2969 00 KAIG3-RFI-SW-C-2969-00
KAIG3-RFI-WG-C-2966 00 KAIG3-RFI-WG-C-2966-00
KAIG3-RFI-CO-S-6140 00 KAIG3-RFI-CO-S-6140-00
KAIG3-RFI-CO-S-6141 00 KAIG3-RFI-CO-S-6141-00
KAIG3-RFI-CO-S-6138 00 KAIG3-RFI-CO-S-6138-00
KAIG3-RFI-CO-S-6134 00 KAIG3-RFI-CO-S-6134-00
KAIG3-RFI-CO-S-6135 00 KAIG3-RFI-CO-S-6135-00
KAIG3-RFI-CO-S-6136 00 KAIG3-RFI-CO-S-6136-00
KAIG3-RFI-CO-S-6137 00 KAIG3-RFI-CO-S-6137-00
KAIG3-RFI-SW-C-2965 00 KAIG3-RFI-SW-C-2965-00
KAIG3-RFI-SW-C-2964 00 KAIG3-RFI-SW-C-2964-00
KAIG3-RFI-WG-LS-1026 00 KAIG3-RFI-WG-LS-1026-00
KAIG3-RFI-WG-LS-1025 00 KAIG3-RFI-WG-LS-1025-00
KAIG3-RFI-WG-LS-1024 00 KAIG3-RFI-WG-LS-1024-00
KAIG3-RFI-WG-LS-1023 00 KAIG3-RFI-WG-LS-1023-00
KAIG3-RFI-WG-LS-1022 00 KAIG3-RFI-WG-LS-1022-00
KAIG3-RFI-WG-LS-1021 00 KAIG3-RFI-WG-LS-1021-00
KAIG3-RFI-WG-LS-1020 00 KAIG3-RFI-WG-LS-1020-00
KAIG3-RFI-WG-LS-1019 00 KAIG3-RFI-WG-LS-1019-00
KAIG3-RFI-MB-A-0726 00 KAIG3-RFI-MB-A-0726-00
KAIG3-RFI-SW-LC-0408 00 KAIG3-RFI-SW-LC-0408-00
KAIG3-RFI-SW-LC-0407 00 KAIG3-RFI-SW-LC-0407-00
KAIG3-RFI-SW-LS-1015 00 KAIG3-RFI-SW-LS-1015-00
KAIG3-RFI-SW-LS-1009 01 KAIG3-RFI-SW-LS-1009-01
KAIG3-RFI-SW-LS-0998 01 KAIG3-RFI-SW-LS-0998-01
KAIG3-RFI-SW-C-2963 00 KAIG3-RFI-SW-C-2963-00
KAIG3-RFI-SW-C-2962 00 KAIG3-RFI-SW-C-2962-00
KAIG3-RFI-SW-C-2961 00 KAIG3-RFI-SW-C-2961-00
KAIG3-RFI-SW-C-2960 00 KAIG3-RFI-SW-C-2960-00
KAIG3-RFI-SW-C-2959 00 KAIG3-RFI-SW-C-2959-00
KAIG3-RFI-SW-C-2958 00 KAIG3-RFI-SW-C-2958-00
KAIG3-RFI-SW-C-2957 00 KAIG3-RFI-SW-C-2957-00
KAIG3-RFI-SW-C-2956 00 KAIG3-RFI-SW-C-2956-00
KAIG3-RFI-SW-C-2955 00 KAIG3-RFI-SW-C-2955-00
KAIG3-RFI-SW-C-2950 00 KAIG3-RFI-SW-C-2950-00
KAIG3-RFI-SW-C-2949 00 KAIG3-RFI-SW-C-2949-00
KAIG3-RFI-SW-C-2948 00 KAIG3-RFI-SW-C-2948-00
KAIG3-RFI-SW-C-2947 00 KAIG3-RFI-SW-C-2947-00
KAIG3-RFI-SW-C-2946 00 KAIG3-RFI-SW-C-2946-00
KAIG3-RFI-PA-C-2933 00 KAIG3-RFI-PA-C-2933-00
KAIG3-RFI-SW-C-2945 00 KAIG3-RFI-SW-C-2945-00
KAIG3-RFI-SW-C-2935 00 KAIG3-RFI-SW-C-2935-00
KAIG3-RFI-SW-C-2934 00 KAIG3-RFI-SW-C-2934-00
KAIG3-RFI-SW-C-2932 00 KAIG3-RFI-SW-C-2932-00
KAIG3-RFI-SW-C-2931 00 KAIG3-RFI-SW-C-2931-00
KAIG3-RFI-SW-C-2930 00 KAIG3-RFI-SW-C-2930-00
KAIG3-RFI-SW-C-2929 00 KAIG3-RFI-SW-C-2929-00
KAIG3-RFI-PC-E-0359 00 KAIG3-RFI-PC-E-0359-00
KAIG3-RFI-PC-E-0358 00 KAIG3-RFI-PC-E-0358-00
KAIG3-RFI-PC-LC-0412 00 KAIG3-RFI-PC-LC-0412-00
KAIG3-RFI-PC-LC-0411 00 KAIG3-RFI-PC-LC-0411-00
KAIG3-RFI-PC-LC-0410 00 KAIG3-RFI-PC-LC-0410-00
KAIG3-RFI-PC-LC-0409 00 KAIG3-RFI-PC-LC-0409-00
KAIG3-RFI-SW-C-2920 00 KAIG3-RFI-SW-C-2920-00
KAIG3-RFI-SW-C-2919 00 KAIG3-RFI-SW-C-2919-00
KAIG3-RFI-CO-SU-2126 00 KAIG3-RFI-CO-SU-2126-00
KAIG3-RFI-WG-C-2926 00 KAIG3-RFI-WG-C-2926-00
KAIG3-RFI-SW-C-2890 00 KAIG3-RFI-SW-C-2890-00
KAIG3-RFI-SG-C-2925 00 KAIG3-RFI-SG-C-2925-00
KAIG3-RFI-MC-SU-2127 00 KAIG3-RFI-MC-SU-2127-00
KAIG3-RFI-CO-SU-2125 00 KAIG3-RFI-CO-SU-2125-00
KAIG3-RFI-CO-C-2951 00 KAIG3-RFI-CO-C-2951-00
KAIG3-RFI-CO-C-2952 00 KAIG3-RFI-CO-C-2952-00
KAIG3-RFI-WG-S-6124 00 KAIG3-RFI-WG-S-6124-00
KAIG3-RFI-CO-C-2953 00 KAIG3-RFI-CO-C-2953-00
KAIG3-RFI-WG-LS-1018 00 KAIG3-RFI-WG-LS-1018-00
KAIG3-RFI-MC-C-2954 00 KAIG3-RFI-MC-C-2954-00
KAIG3-RFI-LM-C-2937 00 KAIG3-RFI-LM-C-2937-00
KAIG3-RFI-WG-LS-1017 00 KAIG3-RFI-WG-LS-1017-00
KAIG3-RFI-WG-LS-1016 00 KAIG3-RFI-WG-LS-1016-00
KAIG3-RFI-WG-LS-1014 00 KAIG3-RFI-WG-LS-1014-00
KAIG3-RFI-LM-C-2938 00 KAIG3-RFI-LM-C-2938-00
KAIG3-RFI-AG-S-6123 00 KAIG3-RFI-AG-S-6123-00
KAIG3-RFI-LM-C-2936 00 KAIG3-RFI-LM-C-2936-00
KAIG3-RFI-WG-LS-1013 00 KAIG3-RFI-WG-LS-1013-00
KAIG3-RFI-CO-S-6129 00 KAIG3-RFI-CO-S-6129-00
KAIG3-RFI-CO-S-6130 00 KAIG3-RFI-CO-S-6130-00
KAIG3-RFI-ZG-LS-1012 00 KAIG3-RFI-ZG-LS-1012-00
KAIG3-RFI-AG-S-6122 00 KAIG3-RFI-AG-S-6122-00
KAIG3-RFI-WG-LS-1011 00 KAIG3-RFI-WG-LS-1011-00
KAIG3-RFI-CO-S-6131 00 KAIG3-RFI-CO-S-6131-00
KAIG3-RFI-MC-S-6132 00 KAIG3-RFI-MC-S-6132-00
KAIG3-RFI-MC-S-6133 00 KAIG3-RFI-MC-S-6133-00
KAIG3-RFI-CO-S-6126 00 KAIG3-RFI-CO-S-6126-00
KAIG3-RFI-CO-S-6127 00 KAIG3-RFI-CO-S-6127-00
KAIG3-RFI-MC-S-6000 01 KAIG3-RFI-MC-S-6000-01
KAIG3-RFI-CO-S-6125 00 KAIG3-RFI-CO-S-6125-00
KAIG3-RFI-SW-C-2944 00 KAIG3-RFI-SW-C-2944-00
KAIG3-RFI-SW-C-2943 00 KAIG3-RFI-SW-C-2943-00
KAIG3-RFI-SW-C-2942 00 KAIG3-RFI-SW-C-2942-00
KAIG3-RFI-SW-C-2940 00 KAIG3-RFI-SW-C-2940-00
KAIG3-RFI-SW-C-2939 00 KAIG3-RFI-SW-C-2939-00
KAIG3-RFI-WG-P-0185 00 KAIG3-RFI-WG-P-0185-00
KAIG3-RFI-WG-E-0357 00 KAIG3-RFI-WG-E-0357-00
KAIG3-RFI-WG-LS-1010 00 KAIG3-RFI-WG-LS-1010-00
KAIG3-RFI-WG-LS-1005 00 KAIG3-RFI-WG-LS-1005-00
KAIG3-RFI-WG-C-2924 00 KAIG3-RFI-WG-C-2924-00
KAIG3-RFI-WG-C-2923 00 KAIG3-RFI-WG-C-2923-00
KAIG3-RFI-WG-C-2922 00 KAIG3-RFI-WG-C-2922-00
KAIG3-RFI-ZG-C-2921 00 KAIG3-RFI-ZG-C-2921-00
KAIG3-RFI-ZG-C-2900 00 KAIG3-RFI-ZG-C-2900-00
KAIG3-RFI-AG-S-6117 00 KAIG3-RFI-AG-S-6117-00
KAIG3-RFI-WG-LS-1004 00 KAIG3-RFI-WG-LS-1004-00
KAIG3-RFI-WG-C-2899 00 KAIG3-RFI-WG-C-2899-00
KAIG3-RFI-CO-C-2910 00 KAIG3-RFI-CO-C-2910-00
KAIG3-RFI-CO-C-2911 00 KAIG3-RFI-CO-C-2911-00
KAIG3-RFI-CO-C-2912 00 KAIG3-RFI-CO-C-2912-00
KAIG3-RFI-CO-C-2913 00 KAIG3-RFI-CO-C-2913-00
KAIG3-RFI-MC-C-2927 00 KAIG3-RFI-MC-C-2927-00
KAIG3-RFI-CO-SS-0040 00 KAIG3-RFI-CO-SS-0040-00
KAIG3-RFI-CO-SU-2122 00 KAIG3-RFI-CO-SU-2122-00
KAIG3-RFI-SW-LS-1009 00 KAIG3-RFI-SW-LS-1009-00
KAIG3-RFI-SW-LS-1008 00 KAIG3-RFI-SW-LS-1008-00
KAIG3-RFI-SW-C-2928 00 KAIG3-RFI-SW-C-2928-00
KAIG3-RFI-SW-C-2918 00 KAIG3-RFI-SW-C-2918-00
KAIG3-RFI-SW-C-2917 00 KAIG3-RFI-SW-C-2917-00
KAIG3-RFI-SW-C-2916 00 KAIG3-RFI-SW-C-2916-00
KAIG3-RFI-SW-C-2915 00 KAIG3-RFI-SW-C-2915-00
KAIG3-RFI-SW-C-2914 00 KAIG3-RFI-SW-C-2914-00
KAIG3-RFI-SW-C-2909 00 KAIG3-RFI-SW-C-2909-00
KAIG3-RFI-SW-C-2908 00 KAIG3-RFI-SW-C-2908-00
KAIG3-RFI-CO-SU-2121 00 KAIG3-RFI-CO-SU-2121-00
KAIG3-RFI-SW-C-2907 00 KAIG3-RFI-SW-C-2907-00
KAIG3-RFI-SW-C-2906 00 KAIG3-RFI-SW-C-2906-00
KAIG3-RFI-SW-C-2905 00 KAIG3-RFI-SW-C-2905-00
KAIG3-RFI-SW-C-2904 00 KAIG3-RFI-SW-C-2904-00
KAIG3-RFI-SW-C-2889 00 KAIG3-RFI-SW-C-2889-00
KAIG3-RFI-SW-C-2826 00 KAIG3-RFI-SW-C-2826-00
KAIG3-RFI-NR-S-6120 00 KAIG3-RFI-NR-S-6120-00
KAIG3-RFI-CO-S-6115 00 KAIG3-RFI-CO-S-6115-00
KAIG3-RFI-CO-S-6116 00 KAIG3-RFI-CO-S-6116-00
KAIG3-RFI-CO-S-6118 00 KAIG3-RFI-CO-S-6118-00
KAIG3-RFI-CO-S-6119 00 KAIG3-RFI-CO-S-6119-00
KAIG3-RFI-CO-S-6111 00 KAIG3-RFI-CO-S-6111-00
KAIG3-RFI-CO-S-6112 00 KAIG3-RFI-CO-S-6112-00
KAIG3-RFI-MC-S-6113 00 KAIG3-RFI-MC-S-6113-00
KAIG3-RFI-MC-S-6114 00 KAIG3-RFI-MC-S-6114-00
KAIG3-RFI-SW-LS-1007 00 KAIG3-RFI-SW-LS-1007-00
KAIG3-RFI-SW-LS-1006 00 KAIG3-RFI-SW-LS-1006-00
KAIG3-RFI-SW-LS-1002 00 KAIG3-RFI-SW-LS-1002-00
KAIG3-RFI-SW-LS-1001 00 KAIG3-RFI-SW-LS-1001-00
KAIG3-RFI-SW-LS-1000 00 KAIG3-RFI-SW-LS-1000-00
KAIG3-RFI-SW-C-2894 00 KAIG3-RFI-SW-C-2894-00
KAIG3-RFI-SW-C-2893 00 KAIG3-RFI-SW-C-2893-00
KAIG3-RFI-SW-C-2892 00 KAIG3-RFI-SW-C-2892-00
KAIG3-RFI-SW-C-2891 00 KAIG3-RFI-SW-C-2891-00
KAIG3-RFI-PA-C-2888 00 KAIG3-RFI-PA-C-2888-00
KAIG3-RFI-SW-C-2887 00 KAIG3-RFI-SW-C-2887-00
KAIG3-RFI-SW-C-2886 00 KAIG3-RFI-SW-C-2886-00
KAIG3-RFI-SW-C-2885 00 KAIG3-RFI-SW-C-2885-00
KAIG3-RFI-SW-C-2884 00 KAIG3-RFI-SW-C-2884-00
KAIG3-RFI-SW-C-2883 00 KAIG3-RFI-SW-C-2883-00
KAIG3-RFI-SW-C-2882 00 KAIG3-RFI-SW-C-2882-00
KAIG3-RFI-SW-C-2881 00 KAIG3-RFI-SW-C-2881-00
KAIG3-RFI-SW-C-2880 00 KAIG3-RFI-SW-C-2880-00
KAIG3-RFI-SW-C-2879 00 KAIG3-RFI-SW-C-2879-00
KAIG3-RFI-SW-C-2878 00 KAIG3-RFI-SW-C-2878-00
KAIG3-RFI-SW-C-2877 00 KAIG3-RFI-SW-C-2877-00
KAIG3-RFI-SW-C-2876 00 KAIG3-RFI-SW-C-2876-00
KAIG3-RFI-SW-C-2875 00 KAIG3-RFI-SW-C-2875-00
KAIG3-RFI-SW-C-2874 00 KAIG3-RFI-SW-C-2874-00
KAIG3-RFI-SW-C-2873 00 KAIG3-RFI-SW-C-2873-00
KAIG3-RFI-SW-C-2843 00 KAIG3-RFI-SW-C-2843-00
KAIG3-RFI-SW-C-2842 00 KAIG3-RFI-SW-C-2842-00
KAIG3-RFI-SW-C-2841 00 KAIG3-RFI-SW-C-2841-00
KAIG3-RFI-PC-E-0356 00 KAIG3-RFI-PC-E-0356-00
KAIG3-RFI-PC-E-0355 00 KAIG3-RFI-PC-E-0355-00
KAIG3-RFI-PC-E-0354 00 KAIG3-RFI-PC-E-0354-00
KAIG3-RFI-PC-E-0353 00 KAIG3-RFI-PC-E-0353-00
KAIG3-RFI-PC-LC-0406 00 KAIG3-RFI-PC-LC-0406-00
KAIG3-RFI-PC-LC-0405 00 KAIG3-RFI-PC-LC-0405-00
KAIG3-RFI-PC-LC-0404 00 KAIG3-RFI-PC-LC-0404-00
KAIG3-RFI-PC-LC-0403 00 KAIG3-RFI-PC-LC-0403-00
KAIG3-RFI-PC-LC-0402 00 KAIG3-RFI-PC-LC-0402-00
KAIG3-RFI-PC-LC-0401 00 KAIG3-RFI-PC-LC-0401-00
KAIG3-RFI-PC-LC-0400 00 KAIG3-RFI-PC-LC-0400-00
KAIG3-RFI-PC-LC-0399 00 KAIG3-RFI-PC-LC-0399-00
KAIG3-RFI-PC-LC-0398 00 KAIG3-RFI-PC-LC-0398-00
KAIG3-RFI-PC-LC-0397 00 KAIG3-RFI-PC-LC-0397-00
KAIG3-RFI-DG-C-2898 00 KAIG3-RFI-DG-C-2898-00
KAIG3-RFI-SG-C-2897 00 KAIG3-RFI-SG-C-2897-00
KAIG3-RFI-TG-C-2896 00 KAIG3-RFI-TG-C-2896-00
KAIG3-RFI-AG-S-6106 00 KAIG3-RFI-AG-S-6106-00
KAIG3-RFI-AG-S-6105 00 KAIG3-RFI-AG-S-6105-00
KAIG3-RFI-WG-C-2895 00 KAIG3-RFI-WG-C-2895-00
KAIG3-RFI-WG-C-2866 00 KAIG3-RFI-WG-C-2866-00
KAIG3-RFI-AG-S-6077 00 KAIG3-RFI-AG-S-6077-00
KAIG3-RFI-AG-SS-0034 00 KAIG3-RFI-AG-SS-0034-00
KAIG3-RFI-AG-SU-2110 00 KAIG3-RFI-AG-SU-2110-00
KAIG3-RFI-WG-C-2865 00 KAIG3-RFI-WG-C-2865-00
KAIG3-RFI-WG-LS-1003 00 KAIG3-RFI-WG-LS-1003-00
KAIG3-RFI-LM-C-2903 00 KAIG3-RFI-LM-C-2903-00
KAIG3-RFI-LM-C-2902 00 KAIG3-RFI-LM-C-2902-00
KAIG3-RFI-LM-C-2901 00 KAIG3-RFI-LM-C-2901-00
KAIG3-RFI-CO-SU-2080 01 KAIG3-RFI-CO-SU-2080-01
KAIG3-RFI-CO-SU-2116 00 KAIG3-RFI-CO-SU-2116-00
KAIG3-RFI-MC-SU-2117 00 KAIG3-RFI-MC-SU-2117-00
KAIG3-RFI-CO-SU-2118 00 KAIG3-RFI-CO-SU-2118-00
KAIG3-RFI-CO-SU-2119 00 KAIG3-RFI-CO-SU-2119-00
KAIG3-RFI-CO-SU-2120 00 KAIG3-RFI-CO-SU-2120-00
KAIG3-RFI-MC-S-6110 00 KAIG3-RFI-MC-S-6110-00
KAIG3-RFI-CO-S-6012 01 KAIG3-RFI-CO-S-6012-01
KAIG3-RFI-CO-S-6010 01 KAIG3-RFI-CO-S-6010-01
KAIG3-RFI-CO-S-6094 00 KAIG3-RFI-CO-S-6094-00
KAIG3-RFI-CO-S-6095 00 KAIG3-RFI-CO-S-6095-00
KAIG3-RFI-MC-S-6096 00 KAIG3-RFI-MC-S-6096-00
KAIG3-RFI-MC-S-6097 00 KAIG3-RFI-MC-S-6097-00
KAIG3-RFI-CO-S-6100 00 KAIG3-RFI-CO-S-6100-00
KAIG3-RFI-CO-S-6101 00 KAIG3-RFI-CO-S-6101-00
KAIG3-RFI-CO-S-6102 00 KAIG3-RFI-CO-S-6102-00
KAIG3-RFI-CO-S-6103 00 KAIG3-RFI-CO-S-6103-00
KAIG3-RFI-CO-S-6104 00 KAIG3-RFI-CO-S-6104-00
KAIG3-RFI-CO-S-6107 00 KAIG3-RFI-CO-S-6107-00
KAIG3-RFI-CO-S-6108 00 KAIG3-RFI-CO-S-6108-00
KAIG3-RFI-CO-S-6109 00 KAIG3-RFI-CO-S-6109-00
KAIG3-RFI-SR-LC-0383 00 KAIG3-RFI-SR-LC-0383-00
KAIG3-RFI-SR-LC-0396 00 KAIG3-RFI-SR-LC-0396-00
KAIG3-RFI-SA-C-2584 00 KAIG3-RFI-SA-C-2584-00
KAIG3-RFI-SA-C-2583 00 KAIG3-RFI-SA-C-2583-00
KAIG3-RFI-LM-C-2844 00 KAIG3-RFI-LM-C-2844-00
KAIG3-RFI-CO-C-2845 00 KAIG3-RFI-CO-C-2845-00
KAIG3-RFI-CO-C-2846 00 KAIG3-RFI-CO-C-2846-00
KAIG3-RFI-CO-C-2847 00 KAIG3-RFI-CO-C-2847-00
KAIG3-RFI-CO-C-2867 00 KAIG3-RFI-CO-C-2867-00
KAIG3-RFI-CO-C-2868 00 KAIG3-RFI-CO-C-2868-00
KAIG3-RFI-CO-C-2869 00 KAIG3-RFI-CO-C-2869-00
KAIG3-RFI-CO-C-2873 00 KAIG3-RFI-CO-C-2873-00
KAIG3-RFI-SW-LS-0999 00 KAIG3-RFI-SW-LS-0999-00
KAIG3-RFI-SW-LS-0998 00 KAIG3-RFI-SW-LS-0998-00
KAIG3-RFI-SW-LS-0997 00 KAIG3-RFI-SW-LS-0997-00
KAIG3-RFI-SW-LS-0996 00 KAIG3-RFI-SW-LS-0996-00
KAIG3-RFI-WG-C-2861 00 KAIG3-RFI-WG-C-2861-00
KAIG3-RFI-SW-C-2852 00 KAIG3-RFI-SW-C-2852-00
KAIG3-RFI-CO-SU-2115 00 KAIG3-RFI-CO-SU-2115-00
KAIG3-RFI-WG-C-2864 00 KAIG3-RFI-WG-C-2864-00
KAIG3-RFI-SW-C-2851 00 KAIG3-RFI-SW-C-2851-00
KAIG3-RFI-WG-C-2863 00 KAIG3-RFI-WG-C-2863-00
KAIG3-RFI-SW-C-2850 00 KAIG3-RFI-SW-C-2850-00
KAIG3-RFI-SW-C-2849 00 KAIG3-RFI-SW-C-2849-00
KAIG3-RFI-AG-S-6091 00 KAIG3-RFI-AG-S-6091-00
KAIG3-RFI-SW-C-2848 00 KAIG3-RFI-SW-C-2848-00
KAIG3-RFI-WG-C-2862 00 KAIG3-RFI-WG-C-2862-00
KAIG3-RFI-CO-S-6074 00 KAIG3-RFI-CO-S-6074-00
KAIG3-RFI-PG-C-2860 00 KAIG3-RFI-PG-C-2860-00
KAIG3-RFI-SW-C-2840 00 KAIG3-RFI-SW-C-2840-00
KAIG3-RFI-CO-S-6075 00 KAIG3-RFI-CO-S-6075-00
KAIG3-RFI-PG-C-2859 00 KAIG3-RFI-PG-C-2859-00
KAIG3-RFI-PG-C-2858 00 KAIG3-RFI-PG-C-2858-00
KAIG3-RFI-SW-C-2839 00 KAIG3-RFI-SW-C-2839-00
KAIG3-RFI-SG-C-2857 00 KAIG3-RFI-SG-C-2857-00
KAIG3-RFI-CO-S-6092 00 KAIG3-RFI-CO-S-6092-00
KAIG3-RFI-ZG-C-2856 00 KAIG3-RFI-ZG-C-2856-00
KAIG3-RFI-CO-S-6093 00 KAIG3-RFI-CO-S-6093-00
KAIG3-RFI-ZG-C-2855 00 KAIG3-RFI-ZG-C-2855-00
KAIG3-RFI-SW-C-2838 00 KAIG3-RFI-SW-C-2838-00
KAIG3-RFI-ZG-S-6090 00 KAIG3-RFI-ZG-S-6090-00
KAIG3-RFI-SW-C-2837 00 KAIG3-RFI-SW-C-2837-00
KAIG3-RFI-SW-C-2836 00 KAIG3-RFI-SW-C-2836-00
KAIG3-RFI-MC-SU-2084 00 KAIG3-RFI-MC-SU-2084-00
KAIG3-RFI-WG-C-2809 00 KAIG3-RFI-WG-C-2809-00
KAIG3-RFI-TG-C-2808 00 KAIG3-RFI-TG-C-2808-00
KAIG3-RFI-WG-LS-0995 00 KAIG3-RFI-WG-LS-0995-00
KAIG3-RFI-WG-LS-0994 00 KAIG3-RFI-WG-LS-0994-00
KAIG3-RFI-WG-LS-0993 00 KAIG3-RFI-WG-LS-0993-00
KAIG3-RFI-WG-LS-0992 00 KAIG3-RFI-WG-LS-0992-00
KAIG3-RFI-WG-LS-0991 00 KAIG3-RFI-WG-LS-0991-00
KAIG3-RFI-WG-LS-0990 00 KAIG3-RFI-WG-LS-0990-00
KAIG3-RFI-SW-C-2814 00 KAIG3-RFI-SW-C-2814-00
KAIG3-RFI-SW-C-2835 00 KAIG3-RFI-SW-C-2835-00
KAIG3-RFI-SW-C-2834 00 KAIG3-RFI-SW-C-2834-00
KAIG3-RFI-SW-C-2831 00 KAIG3-RFI-SW-C-2831-00
KAIG3-RFI-SW-C-2830 00 KAIG3-RFI-SW-C-2830-00
KAIG3-RFI-SW-C-2829 00 KAIG3-RFI-SW-C-2829-00
KAIG3-RFI-SW-C-2828 00 KAIG3-RFI-SW-C-2828-00
KAIG3-RFI-SW-C-2827 00 KAIG3-RFI-SW-C-2827-00
KAIG3-RFI-SW-C-2825 00 KAIG3-RFI-SW-C-2825-00
KAIG3-RFI-CO-C-2832 00 KAIG3-RFI-CO-C-2832-00
KAIG3-RFI-SW-C-2824 00 KAIG3-RFI-SW-C-2824-00
KAIG3-RFI-SW-C-2823 00 KAIG3-RFI-SW-C-2823-00
KAIG3-RFI-CO-C-2833 00 KAIG3-RFI-CO-C-2833-00
KAIG3-RFI-SW-C-2822 00 KAIG3-RFI-SW-C-2822-00
KAIG3-RFI-SW-C-2821 00 KAIG3-RFI-SW-C-2821-00
KAIG3-RFI-CO-SU-2113 00 KAIG3-RFI-CO-SU-2113-00
KAIG3-RFI-SW-C-2820 00 KAIG3-RFI-SW-C-2820-00
KAIG3-RFI-SW-C-2819 00 KAIG3-RFI-SW-C-2819-00
KAIG3-RFI-CO-SU-2112 00 KAIG3-RFI-CO-SU-2112-00
KAIG3-RFI-SW-C-2818 00 KAIG3-RFI-SW-C-2818-00
KAIG3-RFI-SW-C-2817 00 KAIG3-RFI-SW-C-2817-00
KAIG3-RFI-SW-C-2816 00 KAIG3-RFI-SW-C-2816-00
KAIG3-RFI-CO-S-5981 01 KAIG3-RFI-CO-S-5981-01
KAIG3-RFI-SW-C-2815 00 KAIG3-RFI-SW-C-2815-00
KAIG3-RFI-SW-C-2813 00 KAIG3-RFI-SW-C-2813-00
KAIG3-RFI-SW-C-2812 00 KAIG3-RFI-SW-C-2812-00
KAIG3-RFI-MC-S-6089 00 KAIG3-RFI-MC-S-6089-00
KAIG3-RFI-CO-S-6080 00 KAIG3-RFI-CO-S-6080-00
KAIG3-RFI-SW-C-2811 00 KAIG3-RFI-SW-C-2811-00
KAIG3-RFI-CO-S-6081 00 KAIG3-RFI-CO-S-6081-00
KAIG3-RFI-CO-S-6082 00 KAIG3-RFI-CO-S-6082-00
KAIG3-RFI-CO-S-6083 00 KAIG3-RFI-CO-S-6083-00
KAIG3-RFI-CO-S-6084 00 KAIG3-RFI-CO-S-6084-00
KAIG3-RFI-CO-S-6085 00 KAIG3-RFI-CO-S-6085-00
KAIG3-RFI-PC-LC-0395 00 KAIG3-RFI-PC-LC-0395-00
KAIG3-RFI-PC-LC-0394 00 KAIG3-RFI-PC-LC-0394-00
KAIG3-RFI-PC-LC-0380 00 KAIG3-RFI-PC-LC-0380-00
KAIG3-RFI-PC-E-0352 00 KAIG3-RFI-PC-E-0352-00
KAIG3-RFI-PC-E-0351 00 KAIG3-RFI-PC-E-0351-00
KAIG3-RFI-WG-C-2807 00 KAIG3-RFI-WG-C-2807-00
KAIG3-RFI-WG-LS-0989 00 KAIG3-RFI-WG-LS-0989-00
KAIG3-RFI-WG-LS-0988 00 KAIG3-RFI-WG-LS-0988-00
KAIG3-RFI-WG-LS-0987 00 KAIG3-RFI-WG-LS-0987-00
KAIG3-RFI-WG-LS-0985 00 KAIG3-RFI-WG-LS-0985-00
KAIG3-RFI-ZG-C-2794 00 KAIG3-RFI-ZG-C-2794-00
KAIG3-RFI-TG-C-2793 00 KAIG3-RFI-TG-C-2793-00
KAIG3-RFI-WG-S-6076 00 KAIG3-RFI-WG-S-6076-00
KAIG3-RFI-SW-LS-0986 00 KAIG3-RFI-SW-LS-0986-00
KAIG3-RFI-SW-C-2806 00 KAIG3-RFI-SW-C-2806-00
KAIG3-RFI-SW-C-2805 00 KAIG3-RFI-SW-C-2805-00
KAIG3-RFI-SW-C-2804 00 KAIG3-RFI-SW-C-2804-00
KAIG3-RFI-SW-C-2803 00 KAIG3-RFI-SW-C-2803-00
KAIG3-RFI-SW-C-2802 00 KAIG3-RFI-SW-C-2802-00
KAIG3-RFI-SW-C-2801 00 KAIG3-RFI-SW-C-2801-00
KAIG3-RFI-SW-C-2800 00 KAIG3-RFI-SW-C-2800-00
KAIG3-RFI-SW-C-2799 00 KAIG3-RFI-SW-C-2799-00
KAIG3-RFI-SW-C-2798 00 KAIG3-RFI-SW-C-2798-00
KAIG3-RFI-SW-C-2797 00 KAIG3-RFI-SW-C-2797-00
KAIG3-RFI-SW-C-2796 00 KAIG3-RFI-SW-C-2796-00
KAIG3-RFI-SW-C-2787 00 KAIG3-RFI-SW-C-2787-00
KAIG3-RFI-SW-C-2786 00 KAIG3-RFI-SW-C-2786-00
KAIG3-RFI-SW-C-2785 00 KAIG3-RFI-SW-C-2785-00
KAIG3-RFI-SW-C-2784 00 KAIG3-RFI-SW-C-2784-00
KAIG3-RFI-SW-C-2783 00 KAIG3-RFI-SW-C-2783-00
KAIG3-RFI-CO-C-2597 01 KAIG3-RFI-CO-C-2597-01
KAIG3-RFI-CO-C-2810 00 KAIG3-RFI-CO-C-2810-00
KAIG3-RFI-CO-SU-2108 00 KAIG3-RFI-CO-SU-2108-00
KAIG3-RFI-CO-SU-2109 00 KAIG3-RFI-CO-SU-2109-00
KAIG3-RFI-MC-SU-2111 00 KAIG3-RFI-MC-SU-2111-00
KAIG3-RFI-CO-SU-2107 00 KAIG3-RFI-CO-SU-2107-00
KAIG3-RFI-CO-S-6070 00 KAIG3-RFI-CO-S-6070-00
KAIG3-RFI-CO-S-6072 00 KAIG3-RFI-CO-S-6072-00
KAIG3-RFI-MC-S-6078 00 KAIG3-RFI-MC-S-6078-00
KAIG3-RFI-MC-S-6079 00 KAIG3-RFI-MC-S-6079-00
KAIG3-RFI-CO-S-6073 00 KAIG3-RFI-CO-S-6073-00
KAIG3-RFI-CO-S-6071 00 KAIG3-RFI-CO-S-6071-00
KAIG3-RFI-WG-C-2792 00 KAIG3-RFI-WG-C-2792-00
KAIG3-RFI-WG-LS-0984 00 KAIG3-RFI-WG-LS-0984-00
KAIG3-RFI-PG-C-2791 00 KAIG3-RFI-PG-C-2791-00
KAIG3-RFI-WG-LS-0983 00 KAIG3-RFI-WG-LS-0983-00
KAIG3-RFI-PG-C-2769 00 KAIG3-RFI-PG-C-2769-00
KAIG3-RFI-PG-C-2768 00 KAIG3-RFI-PG-C-2768-00
KAIG3-RFI-SG-C-2767 00 KAIG3-RFI-SG-C-2767-00
KAIG3-RFI-AG-S-6065 00 KAIG3-RFI-AG-S-6065-00
KAIG3-RFI-AG-S-6054 00 KAIG3-RFI-AG-S-6054-00
KAIG3-RFI-ZG-LS-0982 00 KAIG3-RFI-ZG-LS-0982-00
KAIG3-RFI-WG-LS-0981 00 KAIG3-RFI-WG-LS-0981-00
KAIG3-RFI-WG-LS-0980 00 KAIG3-RFI-WG-LS-0980-00
KAIG3-RFI-WG-LS-0979 00 KAIG3-RFI-WG-LS-0979-00
KAIG3-RFI-WG-LS-0978 00 KAIG3-RFI-WG-LS-0978-00
KAIG3-RFI-WG-LS-0977 00 KAIG3-RFI-WG-LS-0977-00
KAIG3-RFI-WG-LS-0976 00 KAIG3-RFI-WG-LS-0976-00
KAIG3-RFI-WG-LS-0975 00 KAIG3-RFI-WG-LS-0975-00
KAIG3-RFI-WG-LS-0974 00 KAIG3-RFI-WG-LS-0974-00
KAIG3-RFI-WG-LS-0973 00 KAIG3-RFI-WG-LS-0973-00
KAIG3-RFI-WG-LS-0972 00 KAIG3-RFI-WG-LS-0972-00
KAIG3-RFI-WG-LS-0971 00 KAIG3-RFI-WG-LS-0971-00
KAIG3-RFI-WG-LS-0943 00 KAIG3-RFI-WG-LS-0943-00
KAIG3-RFI-PC-LC-0393 00 KAIG3-RFI-PC-LC-0393-00
KAIG3-RFI-MB-LC-0392 00 KAIG3-RFI-MB-LC-0392-00
KAIG3-RFI-MB-LC-0391 00 KAIG3-RFI-MB-LC-0391-00
KAIG3-RFI-MB-LC-0390 00 KAIG3-RFI-MB-LC-0390-00
KAIG3-RFI-SW-C-2790 00 KAIG3-RFI-SW-C-2790-00
KAIG3-RFI-SW-C-2789 00 KAIG3-RFI-SW-C-2789-00
KAIG3-RFI-SW-C-2745 00 KAIG3-RFI-SW-C-2745-00
KAIG3-RFI-CO-SU-2106 00 KAIG3-RFI-CO-SU-2106-00
KAIG3-RFI-CO-SU-2105 00 KAIG3-RFI-CO-SU-2105-00
KAIG3-RFI-LM-C-2788 00 KAIG3-RFI-LM-C-2788-00
KAIG3-RFI-CO-C-2778 00 KAIG3-RFI-CO-C-2778-00
KAIG3-RFI-CO-C-2777 00 KAIG3-RFI-CO-C-2777-00
KAIG3-RFI-CO-SS-0037 00 KAIG3-RFI-CO-SS-0037-00
KAIG3-RFI-CO-S-6068 00 KAIG3-RFI-CO-S-6068-00
KAIG3-RFI-MC-S-6069 00 KAIG3-RFI-MC-S-6069-00
KAIG3-RFI-NR-S-6022 00 KAIG3-RFI-NR-S-6022-00
KAIG3-RFI-CO-S-6051 00 KAIG3-RFI-CO-S-6051-00
KAIG3-RFI-CO-S-6062 00 KAIG3-RFI-CO-S-6062-00
KAIG3-RFI-CO-S-6063 00 KAIG3-RFI-CO-S-6063-00
KAIG3-RFI-CO-S-6064 00 KAIG3-RFI-CO-S-6064-00
KAIG3-RFI-CO-S-6066 00 KAIG3-RFI-CO-S-6066-00
KAIG3-RFI-SW-C-2782 00 KAIG3-RFI-SW-C-2782-00
KAIG3-RFI-SW-C-2781 00 KAIG3-RFI-SW-C-2781-00
KAIG3-RFI-CO-S-6067 00 KAIG3-RFI-CO-S-6067-00
KAIG3-RFI-SW-C-2780 00 KAIG3-RFI-SW-C-2780-00
KAIG3-RFI-SW-C-2779 00 KAIG3-RFI-SW-C-2779-00
KAIG3-RFI-SW-C-2776 00 KAIG3-RFI-SW-C-2776-00
KAIG3-RFI-SW-C-2775 00 KAIG3-RFI-SW-C-2775-00
KAIG3-RFI-SW-C-2774 00 KAIG3-RFI-SW-C-2774-00
KAIG3-RFI-SW-C-2773 00 KAIG3-RFI-SW-C-2773-00
KAIG3-RFI-CO-S-6059 00 KAIG3-RFI-CO-S-6059-00
KAIG3-RFI-SW-C-2772 00 KAIG3-RFI-SW-C-2772-00
KAIG3-RFI-SW-C-2771 00 KAIG3-RFI-SW-C-2771-00
KAIG3-RFI-SW-C-2397 00 KAIG3-RFI-SW-C-2397-00
KAIG3-RFI-CO-S-6060 00 KAIG3-RFI-CO-S-6060-00
KAIG3-RFI-SW-LC-0389 00 KAIG3-RFI-SW-LC-0389-00
KAIG3-RFI-SW-LC-0388 00 KAIG3-RFI-SW-LC-0388-00
KAIG3-RFI-SW-LC-0387 00 KAIG3-RFI-SW-LC-0387-00
KAIG3-RFI-SW-LC-0386 00 KAIG3-RFI-SW-LC-0386-00
KAIG3-RFI-SW-LC-0385 00 KAIG3-RFI-SW-LC-0385-00
KAIG3-RFI-SW-LC-0384 00 KAIG3-RFI-SW-LC-0384-00
KAIG3-RFI-SR-LC-0382 00 KAIG3-RFI-SR-LC-0382-00
KAIG3-RFI-DG-LC-0362 01 KAIG3-RFI-DG-LC-0362-01
KAIG3-RFI-WG-C-2500 01 KAIG3-RFI-WG-C-2500-01
KAIG3-RFI-WG-C-2292 01 KAIG3-RFI-WG-C-2292-01
KAIG3-RFI-AG-SS-0039 00 KAIG3-RFI-AG-SS-0039-00
KAIG3-RFI-AG-SU-2091 00 KAIG3-RFI-AG-SU-2091-00
KAIG3-RFI-AG-S-6014 00 KAIG3-RFI-AG-S-6014-00
KAIG3-RFI-WG-C-2766 00 KAIG3-RFI-WG-C-2766-00
KAIG3-RFI-PG-C-2731 00 KAIG3-RFI-PG-C-2731-00
KAIG3-RFI-WG-LS-0942 00 KAIG3-RFI-WG-LS-0942-00
KAIG3-RFI-ZG-C-2730 00 KAIG3-RFI-ZG-C-2730-00
KAIG3-RFI-SW-LS-0970 00 KAIG3-RFI-SW-LS-0970-00
KAIG3-RFI-SW-LS-0969 00 KAIG3-RFI-SW-LS-0969-00
KAIG3-RFI-SW-LS-0968 00 KAIG3-RFI-SW-LS-0968-00
KAIG3-RFI-SW-LS-0967 00 KAIG3-RFI-SW-LS-0967-00
KAIG3-RFI-SW-LS-0966 00 KAIG3-RFI-SW-LS-0966-00
KAIG3-RFI-SW-LS-0965 00 KAIG3-RFI-SW-LS-0965-00
KAIG3-RFI-SW-LS-0964 00 KAIG3-RFI-SW-LS-0964-00
KAIG3-RFI-SW-LS-0963 00 KAIG3-RFI-SW-LS-0963-00
KAIG3-RFI-SW-LS-0962 00 KAIG3-RFI-SW-LS-0962-00
KAIG3-RFI-SW-LS-0961 00 KAIG3-RFI-SW-LS-0961-00
KAIG3-RFI-SW-C-2770 00 KAIG3-RFI-SW-C-2770-00
KAIG3-RFI-SW-C-2765 00 KAIG3-RFI-SW-C-2765-00
KAIG3-RFI-SW-C-2764 00 KAIG3-RFI-SW-C-2764-00
KAIG3-RFI-SW-C-2763 00 KAIG3-RFI-SW-C-2763-00
KAIG3-RFI-SW-C-2762 00 KAIG3-RFI-SW-C-2762-00
KAIG3-RFI-SW-C-2761 00 KAIG3-RFI-SW-C-2761-00
KAIG3-RFI-SW-C-2760 00 KAIG3-RFI-SW-C-2760-00
KAIG3-RFI-SW-C-2759 00 KAIG3-RFI-SW-C-2759-00
KAIG3-RFI-SW-C-2758 00 KAIG3-RFI-SW-C-2758-00
KAIG3-RFI-SW-C-2757 00 KAIG3-RFI-SW-C-2757-00
KAIG3-RFI-SW-C-2756 00 KAIG3-RFI-SW-C-2756-00
KAIG3-RFI-SW-C-2755 00 KAIG3-RFI-SW-C-2755-00
KAIG3-RFI-SW-C-2754 00 KAIG3-RFI-SW-C-2754-00
KAIG3-RFI-SW-C-2753 00 KAIG3-RFI-SW-C-2753-00
KAIG3-RFI-SW-C-2752 00 KAIG3-RFI-SW-C-2752-00
KAIG3-RFI-SW-C-2751 00 KAIG3-RFI-SW-C-2751-00
KAIG3-RFI-SW-C-2750 00 KAIG3-RFI-SW-C-2750-00
KAIG3-RFI-CO-S-6037 00 KAIG3-RFI-CO-S-6037-00
KAIG3-RFI-SW-C-2749 00 KAIG3-RFI-SW-C-2749-00
KAIG3-RFI-SW-C-2748 00 KAIG3-RFI-SW-C-2748-00
KAIG3-RFI-SW-C-2747 00 KAIG3-RFI-SW-C-2747-00
KAIG3-RFI-CO-SU-2097 00 KAIG3-RFI-CO-SU-2097-00
KAIG3-RFI-MC-SU-2101 00 KAIG3-RFI-MC-SU-2101-00
KAIG3-RFI-CO-SU-2102 00 KAIG3-RFI-CO-SU-2102-00
KAIG3-RFI-CO-SU-2103 00 KAIG3-RFI-CO-SU-2103-00
KAIG3-RFI-CO-SS-0036 00 KAIG3-RFI-CO-SS-0036-00
KAIG3-RFI-CO-C-2736 00 KAIG3-RFI-CO-C-2736-00
KAIG3-RFI-WG-P-0184 00 KAIG3-RFI-WG-P-0184-00
KAIG3-RFI-SW-C-2746 00 KAIG3-RFI-SW-C-2746-00
KAIG3-RFI-CO-S-6038 00 KAIG3-RFI-CO-S-6038-00
KAIG3-RFI-SW-C-2744 00 KAIG3-RFI-SW-C-2744-00
KAIG3-RFI-CO-S-6039 00 KAIG3-RFI-CO-S-6039-00
KAIG3-RFI-SW-C-2743 00 KAIG3-RFI-SW-C-2743-00
KAIG3-RFI-MC-S-6048 00 KAIG3-RFI-MC-S-6048-00
KAIG3-RFI-MC-S-6049 00 KAIG3-RFI-MC-S-6049-00
KAIG3-RFI-MC-S-6050 00 KAIG3-RFI-MC-S-6050-00
KAIG3-RFI-CO-S-6007 00 KAIG3-RFI-CO-S-6007-00
KAIG3-RFI-CO-S-6052 00 KAIG3-RFI-CO-S-6052-00
KAIG3-RFI-CO-S-6053 00 KAIG3-RFI-CO-S-6053-00
KAIG3-RFI-CO-S-6055 00 KAIG3-RFI-CO-S-6055-00
KAIG3-RFI-CO-S-6056 00 KAIG3-RFI-CO-S-6056-00
KAIG3-RFI-CO-S-6057 00 KAIG3-RFI-CO-S-6057-00
KAIG3-RFI-CO-S-6058 00 KAIG3-RFI-CO-S-6058-00
KAIG3-RFI-CO-S-6023 00 KAIG3-RFI-CO-S-6023-00
KAIG3-RFI-CO-S-6024 00 KAIG3-RFI-CO-S-6024-00
KAIG3-RFI-SW-LS-0960 00 KAIG3-RFI-SW-LS-0960-00
KAIG3-RFI-SW-LS-0959 00 KAIG3-RFI-SW-LS-0959-00
KAIG3-RFI-SW-LS-0958 00 KAIG3-RFI-SW-LS-0958-00
KAIG3-RFI-SW-LS-0957 00 KAIG3-RFI-SW-LS-0957-00
KAIG3-RFI-SW-LS-0956 00 KAIG3-RFI-SW-LS-0956-00
KAIG3-RFI-SW-LS-0955 00 KAIG3-RFI-SW-LS-0955-00
KAIG3-RFI-SW-LS-0954 00 KAIG3-RFI-SW-LS-0954-00
KAIG3-RFI-SW-LS-0953 00 KAIG3-RFI-SW-LS-0953-00
KAIG3-RFI-SW-LS-0952 00 KAIG3-RFI-SW-LS-0952-00
KAIG3-RFI-SW-LS-0951 00 KAIG3-RFI-SW-LS-0951-00
KAIG3-RFI-SW-LS-0950 00 KAIG3-RFI-SW-LS-0950-00
KAIG3-RFI-SW-LS-0949 00 KAIG3-RFI-SW-LS-0949-00
KAIG3-RFI-SW-LS-0948 00 KAIG3-RFI-SW-LS-0948-00
KAIG3-RFI-SW-LS-0947 00 KAIG3-RFI-SW-LS-0947-00
KAIG3-RFI-SW-C-2742 00 KAIG3-RFI-SW-C-2742-00
KAIG3-RFI-SW-C-2741 00 KAIG3-RFI-SW-C-2741-00
KAIG3-RFI-SW-C-2740 00 KAIG3-RFI-SW-C-2740-00
KAIG3-RFI-SW-C-2739 00 KAIG3-RFI-SW-C-2739-00
KAIG3-RFI-SW-C-2738 00 KAIG3-RFI-SW-C-2738-00
KAIG3-RFI-SW-C-2734 00 KAIG3-RFI-SW-C-2734-00
KAIG3-RFI-SW-C-2733 00 KAIG3-RFI-SW-C-2733-00
KAIG3-RFI-SW-C-2732 00 KAIG3-RFI-SW-C-2732-00
KAIG3-RFI-SW-C-2727 00 KAIG3-RFI-SW-C-2727-00
KAIG3-RFI-SW-C-2726 00 KAIG3-RFI-SW-C-2726-00
KAIG3-RFI-SW-C-2725 00 KAIG3-RFI-SW-C-2725-00
KAIG3-RFI-SW-C-2724 00 KAIG3-RFI-SW-C-2724-00
KAIG3-RFI-SW-C-2723 00 KAIG3-RFI-SW-C-2723-00
KAIG3-RFI-SW-C-2722 00 KAIG3-RFI-SW-C-2722-00
KAIG3-RFI-SW-C-2721 00 KAIG3-RFI-SW-C-2721-00
KAIG3-RFI-SW-C-2720 00 KAIG3-RFI-SW-C-2720-00
KAIG3-RFI-SW-C-2719 00 KAIG3-RFI-SW-C-2719-00
KAIG3-RFI-WG-LS-0941 00 KAIG3-RFI-WG-LS-0941-00
KAIG3-RFI-WG-C-2729 00 KAIG3-RFI-WG-C-2729-00
KAIG3-RFI-TG-C-2728 00 KAIG3-RFI-TG-C-2728-00
KAIG3-RFI-DG-C-2716 00 KAIG3-RFI-DG-C-2716-00
KAIG3-RFI-AG-S-6042 00 KAIG3-RFI-AG-S-6042-00
KAIG3-RFI-AG-S-6041 00 KAIG3-RFI-AG-S-6041-00
KAIG3-RFI-SG-C-2715 00 KAIG3-RFI-SG-C-2715-00
KAIG3-RFI-WG-SU-2098 00 KAIG3-RFI-WG-SU-2098-00
KAIG3-RFI-WG-S-6040 00 KAIG3-RFI-WG-S-6040-00
KAIG3-RFI-CO-C-2735 00 KAIG3-RFI-CO-C-2735-00
KAIG3-RFI-NA-C-2737 00 KAIG3-RFI-NA-C-2737-00
KAIG3-RFI-MC-SU-2100 00 KAIG3-RFI-MC-SU-2100-00
KAIG3-RFI-CO-SU-2099 00 KAIG3-RFI-CO-SU-2099-00
KAIG3-RFI-CO-SU-2096 00 KAIG3-RFI-CO-SU-2096-00
KAIG3-RFI-CO-SU-2095 00 KAIG3-RFI-CO-SU-2095-00
KAIG3-RFI-CO-SS-0035 00 KAIG3-RFI-CO-SS-0035-00
KAIG3-RFI-MC-S-6047 00 KAIG3-RFI-MC-S-6047-00
KAIG3-RFI-CO-S-6043 00 KAIG3-RFI-CO-S-6043-00
KAIG3-RFI-CO-S-6044 00 KAIG3-RFI-CO-S-6044-00
KAIG3-RFI-CO-S-6045 00 KAIG3-RFI-CO-S-6045-00
KAIG3-RFI-MC-S-6046 00 KAIG3-RFI-MC-S-6046-00
KAIG3-RFI-CO-S-6034 00 KAIG3-RFI-CO-S-6034-00
KAIG3-RFI-CO-S-6035 00 KAIG3-RFI-CO-S-6035-00
KAIG3-RFI-CO-S-6036 00 KAIG3-RFI-CO-S-6036-00
KAIG3-RFI-CO-S-6033 00 KAIG3-RFI-CO-S-6033-00
KAIG3-RFI-CO-S-6029 00 KAIG3-RFI-CO-S-6029-00
KAIG3-RFI-MC-S-6030 00 KAIG3-RFI-MC-S-6030-00
KAIG3-RFI-MC-S-6031 00 KAIG3-RFI-MC-S-6031-00
KAIG3-RFI-CO-S-6032 00 KAIG3-RFI-CO-S-6032-00
KAIG3-RFI-SW-P-0159 02 KAIG3-RFI-SW-P-0159-02
KAIG3-RFI-WG-C-2714 00 KAIG3-RFI-WG-C-2714-00
KAIG3-RFI-PG-C-2713 00 KAIG3-RFI-PG-C-2713-00
KAIG3-RFI-PG-C-2712 00 KAIG3-RFI-PG-C-2712-00
KAIG3-RFI-PG-C-2711 00 KAIG3-RFI-PG-C-2711-00
KAIG3-RFI-ZG-C-2710 00 KAIG3-RFI-ZG-C-2710-00
KAIG3-RFI-WG-LS-0926 00 KAIG3-RFI-WG-LS-0926-00
KAIG3-RFI-ZG-S-6026 00 KAIG3-RFI-ZG-S-6026-00
KAIG3-RFI-AG-S-5939 01 KAIG3-RFI-AG-S-5939-01
KAIG3-RFI-WG-S-5938 01 KAIG3-RFI-WG-S-5938-01
KAIG3-RFI-SW-LS-0946 00 KAIG3-RFI-SW-LS-0946-00
KAIG3-RFI-SW-LS-0945 00 KAIG3-RFI-SW-LS-0945-00
KAIG3-RFI-SW-LS-0944 00 KAIG3-RFI-SW-LS-0944-00
KAIG3-RFI-SW-LS-0939 00 KAIG3-RFI-SW-LS-0939-00
KAIG3-RFI-SW-LS-0938 00 KAIG3-RFI-SW-LS-0938-00
KAIG3-RFI-SW-LS-0937 00 KAIG3-RFI-SW-LS-0937-00
KAIG3-RFI-SW-LS-0936 00 KAIG3-RFI-SW-LS-0936-00
KAIG3-RFI-SW-LS-0935 00 KAIG3-RFI-SW-LS-0935-00
KAIG3-RFI-SW-C-2718 00 KAIG3-RFI-SW-C-2718-00
KAIG3-RFI-SW-C-2707 00 KAIG3-RFI-SW-C-2707-00
KAIG3-RFI-SW-C-2706 00 KAIG3-RFI-SW-C-2706-00
KAIG3-RFI-SW-C-2705 00 KAIG3-RFI-SW-C-2705-00
KAIG3-RFI-SW-C-2704 00 KAIG3-RFI-SW-C-2704-00
KAIG3-RFI-SW-C-2703 00 KAIG3-RFI-SW-C-2703-00
KAIG3-RFI-SW-C-2709 00 KAIG3-RFI-SW-C-2709-00
KAIG3-RFI-SW-C-2708 00 KAIG3-RFI-SW-C-2708-00
KAIG3-RFI-NR-S-6020 00 KAIG3-RFI-NR-S-6020-00
KAIG3-RFI-NR-S-6021 00 KAIG3-RFI-NR-S-6021-00
KAIG3-RFI-MC-S-6025 00 KAIG3-RFI-MC-S-6025-00
KAIG3-RFI-MC-S-6019 00 KAIG3-RFI-MC-S-6019-00
KAIG3-RFI-CO-S-6027 00 KAIG3-RFI-CO-S-6027-00
KAIG3-RFI-CO-S-6028 00 KAIG3-RFI-CO-S-6028-00
KAIG3-RFI-CO-A-0657 01 KAIG3-RFI-CO-A-0657-01
KAIG3-RFI-NR-SU-2093 00 KAIG3-RFI-NR-SU-2093-00
KAIG3-RFI-CO-SU-2094 00 KAIG3-RFI-CO-SU-2094-00
KAIG3-RFI-CO-C-2717 00 KAIG3-RFI-CO-C-2717-00
KAIG3-RFI-SW-LC-0379 00 KAIG3-RFI-SW-LC-0379-00
KAIG3-RFI-SW-LC-0378 00 KAIG3-RFI-SW-LC-0378-00
KAIG3-RFI-SW-E-0350 00 KAIG3-RFI-SW-E-0350-00
KAIG3-RFI-PC-LC-0376 00 KAIG3-RFI-PC-LC-0376-00
KAIG3-RFI-SG-C-2702 00 KAIG3-RFI-SG-C-2702-00
KAIG3-RFI-SG-S-6018 00 KAIG3-RFI-SG-S-6018-00
KAIG3-RFI-WG-C-2700 00 KAIG3-RFI-WG-C-2700-00
KAIG3-RFI-WG-C-2699 00 KAIG3-RFI-WG-C-2699-00
KAIG3-RFI-WG-C-2678 00 KAIG3-RFI-WG-C-2678-00
KAIG3-RFI-WG-C-2677 00 KAIG3-RFI-WG-C-2677-00
KAIG3-RFI-WG-C-2676 00 KAIG3-RFI-WG-C-2676-00
KAIG3-RFI-SW-LS-0934 00 KAIG3-RFI-SW-LS-0934-00
KAIG3-RFI-SW-LS-0933 00 KAIG3-RFI-SW-LS-0933-00
KAIG3-RFI-SW-LS-0932 00 KAIG3-RFI-SW-LS-0932-00
KAIG3-RFI-SW-C-2697 00 KAIG3-RFI-SW-C-2697-00
KAIG3-RFI-SW-C-2696 00 KAIG3-RFI-SW-C-2696-00
KAIG3-RFI-SW-C-2695 00 KAIG3-RFI-SW-C-2695-00
KAIG3-RFI-SW-C-2694 00 KAIG3-RFI-SW-C-2694-00
KAIG3-RFI-SW-C-2693 00 KAIG3-RFI-SW-C-2693-00
KAIG3-RFI-SW-C-2692 00 KAIG3-RFI-SW-C-2692-00
KAIG3-RFI-SW-C-2691 00 KAIG3-RFI-SW-C-2691-00
KAIG3-RFI-SW-C-2690 00 KAIG3-RFI-SW-C-2690-00
KAIG3-RFI-SW-C-2689 00 KAIG3-RFI-SW-C-2689-00
KAIG3-RFI-SW-C-2688 00 KAIG3-RFI-SW-C-2688-00
KAIG3-RFI-CO-C-2701 00 KAIG3-RFI-CO-C-2701-00
KAIG3-RFI-CO-C-2698 00 KAIG3-RFI-CO-C-2698-00
KAIG3-RFI-CO-S-5959 00 KAIG3-RFI-CO-S-5959-00
KAIG3-RFI-CO-S-6017 00 KAIG3-RFI-CO-S-6017-00
KAIG3-RFI-CO-S-6016 00 KAIG3-RFI-CO-S-6016-00
KAIG3-RFI-CO-S-6015 00 KAIG3-RFI-CO-S-6015-00
KAIG3-RFI-CO-SU-2092 00 KAIG3-RFI-CO-SU-2092-00
KAIG3-RFI-CO-SU-2074 01 KAIG3-RFI-CO-SU-2074-01
KAIG3-RFI-PC-LC-0381 00 KAIG3-RFI-PC-LC-0381-00
KAIG3-RFI-PC-LC-0366 01 KAIG3-RFI-PC-LC-0366-01
KAIG3-RFI-PC-LC-0365 01 KAIG3-RFI-PC-LC-0365-01
KAIG3-RFI-PC-LC-0364 01 KAIG3-RFI-PC-LC-0364-01
KAIG3-RFI-DG-LC-0355 01 KAIG3-RFI-DG-LC-0355-01
KAIG3-RFI-DG-LC-0354 01 KAIG3-RFI-DG-LC-0354-01
KAIG3-RFI-TG-P-0183 00 KAIG3-RFI-TG-P-0183-00
KAIG3-RFI-SW-LS-0931 00 KAIG3-RFI-SW-LS-0931-00
KAIG3-RFI-SW-LS-0930 00 KAIG3-RFI-SW-LS-0930-00
KAIG3-RFI-SW-LS-0929 00 KAIG3-RFI-SW-LS-0929-00
KAIG3-RFI-SW-LS-0928 00 KAIG3-RFI-SW-LS-0928-00
KAIG3-RFI-SW-LS-0927 00 KAIG3-RFI-SW-LS-0927-00
KAIG3-RFI-SW-C-2687 00 KAIG3-RFI-SW-C-2687-00
KAIG3-RFI-SW-C-2686 00 KAIG3-RFI-SW-C-2686-00
KAIG3-RFI-SW-C-2685 00 KAIG3-RFI-SW-C-2685-00
KAIG3-RFI-SW-C-2681 00 KAIG3-RFI-SW-C-2681-00
KAIG3-RFI-SW-C-2680 00 KAIG3-RFI-SW-C-2680-00
KAIG3-RFI-SW-C-2679 00 KAIG3-RFI-SW-C-2679-00
KAIG3-RFI-SW-C-2675 00 KAIG3-RFI-SW-C-2675-00
KAIG3-RFI-SW-C-2674 00 KAIG3-RFI-SW-C-2674-00
KAIG3-RFI-SW-C-2673 00 KAIG3-RFI-SW-C-2673-00
KAIG3-RFI-SW-C-2672 00 KAIG3-RFI-SW-C-2672-00
KAIG3-RFI-SW-C-2671 00 KAIG3-RFI-SW-C-2671-00
KAIG3-RFI-SW-C-2670 00 KAIG3-RFI-SW-C-2670-00
KAIG3-RFI-SW-C-2669 00 KAIG3-RFI-SW-C-2669-00
KAIG3-RFI-SW-C-2668 00 KAIG3-RFI-SW-C-2668-00
KAIG3-RFI-SW-C-2667 00 KAIG3-RFI-SW-C-2667-00
KAIG3-RFI-SW-C-2666 00 KAIG3-RFI-SW-C-2666-00
KAIG3-RFI-SW-C-2665 00 KAIG3-RFI-SW-C-2665-00
KAIG3-RFI-SW-C-2664 00 KAIG3-RFI-SW-C-2664-00
KAIG3-RFI-SW-C-2663 00 KAIG3-RFI-SW-C-2663-00
KAIG3-RFI-SW-C-2340 01 KAIG3-RFI-SW-C-2340-01
KAIG3-RFI-MC-C-2684 00 KAIG3-RFI-MC-C-2684-00
KAIG3-RFI-CO-C-2683 00 KAIG3-RFI-CO-C-2683-00
KAIG3-RFI-CO-C-2682 00 KAIG3-RFI-CO-C-2682-00
KAIG3-RFI-CO-SU-2090 00 KAIG3-RFI-CO-SU-2090-00
KAIG3-RFI-CO-SU-2089 00 KAIG3-RFI-CO-SU-2089-00
KAIG3-RFI-CO-SU-2088 00 KAIG3-RFI-CO-SU-2088-00
KAIG3-RFI-CO-SU-2087 00 KAIG3-RFI-CO-SU-2087-00
KAIG3-RFI-CO-S-6013 00 KAIG3-RFI-CO-S-6013-00
KAIG3-RFI-CO-S-6012 00 KAIG3-RFI-CO-S-6012-00
KAIG3-RFI-CO-S-6011 00 KAIG3-RFI-CO-S-6011-00
KAIG3-RFI-CO-S-6010 00 KAIG3-RFI-CO-S-6010-00
KAIG3-RFI-CO-S-6009 00 KAIG3-RFI-CO-S-6009-00
KAIG3-RFI-CO-S-6006 00 KAIG3-RFI-CO-S-6006-00
KAIG3-RFI-ZG-C-2656 00 KAIG3-RFI-ZG-C-2656-00
KAIG3-RFI-PG-C-2655 00 KAIG3-RFI-PG-C-2655-00
KAIG3-RFI-ZG-S-6003 00 KAIG3-RFI-ZG-S-6003-00
KAIG3-RFI-CO-S-6008 00 KAIG3-RFI-CO-S-6008-00
KAIG3-RFI-MC-SU-2086 00 KAIG3-RFI-MC-SU-2086-00
KAIG3-RFI-MC-S-6005 00 KAIG3-RFI-MC-S-6005-00
KAIG3-RFI-MC-S-6004 00 KAIG3-RFI-MC-S-6004-00
KAIG3-RFI-WG-LS-0925 00 KAIG3-RFI-WG-LS-0925-00
KAIG3-RFI-WG-LS-0924 00 KAIG3-RFI-WG-LS-0924-00
KAIG3-RFI-WG-LS-0923 00 KAIG3-RFI-WG-LS-0923-00
KAIG3-RFI-WG-LS-0922 00 KAIG3-RFI-WG-LS-0922-00
KAIG3-RFI-WG-LS-0920 00 KAIG3-RFI-WG-LS-0920-00
KAIG3-RFI-WG-LS-0919 00 KAIG3-RFI-WG-LS-0919-00
KAIG3-RFI-WG-LS-0918 00 KAIG3-RFI-WG-LS-0918-00
KAIG3-RFI-WG-LS-0917 00 KAIG3-RFI-WG-LS-0917-00
KAIG3-RFI-WG-LS-0916 00 KAIG3-RFI-WG-LS-0916-00
KAIG3-RFI-WG-LS-0915 00 KAIG3-RFI-WG-LS-0915-00
KAIG3-RFI-WG-C-2654 00 KAIG3-RFI-WG-C-2654-00
KAIG3-RFI-PC-LC-0377 00 KAIG3-RFI-PC-LC-0377-00
KAIG3-RFI-SG-LC-0375 00 KAIG3-RFI-SG-LC-0375-00
KAIG3-RFI-SG-LC-0374 00 KAIG3-RFI-SG-LC-0374-00
KAIG3-RFI-SG-E-0349 00 KAIG3-RFI-SG-E-0349-00
KAIG3-RFI-SG-E-0348 00 KAIG3-RFI-SG-E-0348-00
KAIG3-RFI-SW-LS-0921 00 KAIG3-RFI-SW-LS-0921-00
KAIG3-RFI-SW-LS-0902 00 KAIG3-RFI-SW-LS-0902-00
KAIG3-RFI-SW-LS-0901 00 KAIG3-RFI-SW-LS-0901-00
KAIG3-RFI-SW-LS-0900 00 KAIG3-RFI-SW-LS-0900-00
KAIG3-RFI-SW-LS-0899 00 KAIG3-RFI-SW-LS-0899-00
KAIG3-RFI-SW-LS-0898 00 KAIG3-RFI-SW-LS-0898-00
KAIG3-RFI-SW-LS-0897 00 KAIG3-RFI-SW-LS-0897-00
KAIG3-RFI-SW-LS-0896 00 KAIG3-RFI-SW-LS-0896-00
KAIG3-RFI-SW-LS-0895 00 KAIG3-RFI-SW-LS-0895-00
KAIG3-RFI-SW-LS-0894 00 KAIG3-RFI-SW-LS-0894-00
KAIG3-RFI-SW-C-2662 00 KAIG3-RFI-SW-C-2662-00
KAIG3-RFI-SW-C-2661 00 KAIG3-RFI-SW-C-2661-00
KAIG3-RFI-SW-C-2660 00 KAIG3-RFI-SW-C-2660-00
KAIG3-RFI-SW-C-2659 00 KAIG3-RFI-SW-C-2659-00
KAIG3-RFI-SW-C-2658 00 KAIG3-RFI-SW-C-2658-00
KAIG3-RFI-SW-C-2657 00 KAIG3-RFI-SW-C-2657-00
KAIG3-RFI-SW-C-2650 00 KAIG3-RFI-SW-C-2650-00
KAIG3-RFI-SW-C-2649 00 KAIG3-RFI-SW-C-2649-00
KAIG3-RFI-SW-C-2648 00 KAIG3-RFI-SW-C-2648-00
KAIG3-RFI-SW-C-2647 00 KAIG3-RFI-SW-C-2647-00
KAIG3-RFI-SW-C-2646 00 KAIG3-RFI-SW-C-2646-00
KAIG3-RFI-SW-C-2645 00 KAIG3-RFI-SW-C-2645-00
KAIG3-RFI-SW-C-2644 00 KAIG3-RFI-SW-C-2644-00
KAIG3-RFI-SW-C-2643 00 KAIG3-RFI-SW-C-2643-00
KAIG3-RFI-SW-C-2642 00 KAIG3-RFI-SW-C-2642-00
KAIG3-RFI-SW-C-2641 00 KAIG3-RFI-SW-C-2641-00
KAIG3-RFI-SW-C-2630 00 KAIG3-RFI-SW-C-2630-00
KAIG3-RFI-WG-LS-0914 00 KAIG3-RFI-WG-LS-0914-00
KAIG3-RFI-WG-LS-0913 00 KAIG3-RFI-WG-LS-0913-00
KAIG3-RFI-WG-LS-0912 00 KAIG3-RFI-WG-LS-0912-00
KAIG3-RFI-WG-LS-0911 00 KAIG3-RFI-WG-LS-0911-00
KAIG3-RFI-WG-LS-0910 00 KAIG3-RFI-WG-LS-0910-00
KAIG3-RFI-WG-LS-0909 00 KAIG3-RFI-WG-LS-0909-00
KAIG3-RFI-WG-LS-0908 00 KAIG3-RFI-WG-LS-0908-00
KAIG3-RFI-WG-LS-0907 00 KAIG3-RFI-WG-LS-0907-00
KAIG3-RFI-MB-A-0725 00 KAIG3-RFI-MB-A-0725-00
KAIG3-RFI-MB-A-0724 00 KAIG3-RFI-MB-A-0724-00
KAIG3-RFI-SG-S-6002 00 KAIG3-RFI-SG-S-6002-00
KAIG3-RFI-PG-C-2653 00 KAIG3-RFI-PG-C-2653-00
KAIG3-RFI-PG-C-2640 00 KAIG3-RFI-PG-C-2640-00
KAIG3-RFI-ZG-C-2639 00 KAIG3-RFI-ZG-C-2639-00
KAIG3-RFI-WG-LS-0906 00 KAIG3-RFI-WG-LS-0906-00
KAIG3-RFI-PG-LS-0905 00 KAIG3-RFI-PG-LS-0905-00
KAIG3-RFI-TG-S-6001 00 KAIG3-RFI-TG-S-6001-00
KAIG3-RFI-ZG-LS-0904 00 KAIG3-RFI-ZG-LS-0904-00
KAIG3-RFI-WG-LS-0903 00 KAIG3-RFI-WG-LS-0903-00
KAIG3-RFI-CO-SS-0029 01 KAIG3-RFI-CO-SS-0029-01
KAIG3-RFI-CO-SU-2085 00 KAIG3-RFI-CO-SU-2085-00
KAIG3-RFI-CO-SU-2060 01 KAIG3-RFI-CO-SU-2060-01
KAIG3-RFI-CO-C-2652 00 KAIG3-RFI-CO-C-2652-00
KAIG3-RFI-MC-C-2651 00 KAIG3-RFI-MC-C-2651-00
KAIG3-RFI-CO-S-5925 00 KAIG3-RFI-CO-S-5925-00
KAIG3-RFI-CO-S-5934 00 KAIG3-RFI-CO-S-5934-00
KAIG3-RFI-CO-S-5992 00 KAIG3-RFI-CO-S-5992-00
KAIG3-RFI-SW-C-2634 00 KAIG3-RFI-SW-C-2634-00
KAIG3-RFI-MC-S-6000 00 KAIG3-RFI-MC-S-6000-00
KAIG3-RFI-CO-S-5999 00 KAIG3-RFI-CO-S-5999-00
KAIG3-RFI-CO-S-5998 00 KAIG3-RFI-CO-S-5998-00
KAIG3-RFI-CO-S-5997 00 KAIG3-RFI-CO-S-5997-00
KAIG3-RFI-CO-S-5924 01 KAIG3-RFI-CO-S-5924-01
KAIG3-RFI-CO-S-5923 01 KAIG3-RFI-CO-S-5923-01
KAIG3-RFI-SW-P-0182 00 KAIG3-RFI-SW-P-0182-00
KAIG3-RFI-SW-LS-0893 00 KAIG3-RFI-SW-LS-0893-00
KAIG3-RFI-SW-LS-0892 00 KAIG3-RFI-SW-LS-0892-00
KAIG3-RFI-SW-LS-0891 00 KAIG3-RFI-SW-LS-0891-00
KAIG3-RFI-SW-C-2629 00 KAIG3-RFI-SW-C-2629-00
KAIG3-RFI-SW-C-2628 00 KAIG3-RFI-SW-C-2628-00
KAIG3-RFI-SW-C-2627 00 KAIG3-RFI-SW-C-2627-00
KAIG3-RFI-SW-C-2626 00 KAIG3-RFI-SW-C-2626-00
KAIG3-RFI-SW-C-2625 00 KAIG3-RFI-SW-C-2625-00
KAIG3-RFI-SW-C-2624 00 KAIG3-RFI-SW-C-2624-00
KAIG3-RFI-SW-C-2618 00 KAIG3-RFI-SW-C-2618-00
KAIG3-RFI-SW-C-2617 00 KAIG3-RFI-SW-C-2617-00
KAIG3-RFI-ZG-LC-0373 00 KAIG3-RFI-ZG-LC-0373-00
KAIG3-RFI-SW-C-2441 00 KAIG3-RFI-SW-C-2441-00
KAIG3-RFI-WG-C-2472 01 KAIG3-RFI-WG-C-2472-01
KAIG3-RFI-MB-A-0723 00 KAIG3-RFI-MB-A-0723-00
KAIG3-RFI-WG-C-2637 00 KAIG3-RFI-WG-C-2637-00
KAIG3-RFI-PG-C-2636 00 KAIG3-RFI-PG-C-2636-00
KAIG3-RFI-WG-S-5996 00 KAIG3-RFI-WG-S-5996-00
KAIG3-RFI-WG-SU-2083 00 KAIG3-RFI-WG-SU-2083-00
KAIG3-RFI-SG-S-5986 00 KAIG3-RFI-SG-S-5986-00
KAIG3-RFI-PG-C-2635 00 KAIG3-RFI-PG-C-2635-00
KAIG3-RFI-ZG-LS-0890 00 KAIG3-RFI-ZG-LS-0890-00
KAIG3-RFI-PG-C-2622 00 KAIG3-RFI-PG-C-2622-00
KAIG3-RFI-WG-LS-0889 00 KAIG3-RFI-WG-LS-0889-00
KAIG3-RFI-WG-LS-0882 00 KAIG3-RFI-WG-LS-0882-00
KAIG3-RFI-MC-S-5995 00 KAIG3-RFI-MC-S-5995-00
KAIG3-RFI-SW-C-2242 01 KAIG3-RFI-SW-C-2242-01
KAIG3-RFI-SW-C-2240 01 KAIG3-RFI-SW-C-2240-01
KAIG3-RFI-CO-C-2633 00 KAIG3-RFI-CO-C-2633-00
KAIG3-RFI-CO-C-2632 00 KAIG3-RFI-CO-C-2632-00
KAIG3-RFI-CO-C-2631 00 KAIG3-RFI-CO-C-2631-00
KAIG3-RFI-CO-SU-2082 00 KAIG3-RFI-CO-SU-2082-00
KAIG3-RFI-CO-S-5994 00 KAIG3-RFI-CO-S-5994-00
KAIG3-RFI-CO-S-5993 00 KAIG3-RFI-CO-S-5993-00
KAIG3-RFI-AG-LC-0368 00 KAIG3-RFI-AG-LC-0368-00
KAIG3-RFI-PC-E-0346 00 KAIG3-RFI-PC-E-0346-00
KAIG3-RFI-PC-LC-0372 00 KAIG3-RFI-PC-LC-0372-00
KAIG3-RFI-PC-LC-0371 00 KAIG3-RFI-PC-LC-0371-00
KAIG3-RFI-ZG-LC-0370 00 KAIG3-RFI-ZG-LC-0370-00
KAIG3-RFI-ZG-LC-0369 00 KAIG3-RFI-ZG-LC-0369-00
KAIG3-RFI-CO-SU-2081 00 KAIG3-RFI-CO-SU-2081-00
KAIG3-RFI-CO-SU-2080 00 KAIG3-RFI-CO-SU-2080-00
KAIG3-RFI-CO-SU-2079 00 KAIG3-RFI-CO-SU-2079-00
KAIG3-RFI-CO-S-5991 00 KAIG3-RFI-CO-S-5991-00
KAIG3-RFI-SG-C-2621 00 KAIG3-RFI-SG-C-2621-00
KAIG3-RFI-WG-C-2620 00 KAIG3-RFI-WG-C-2620-00
KAIG3-RFI-WG-C-2619 00 KAIG3-RFI-WG-C-2619-00
KAIG3-RFI-WG-C-2605 00 KAIG3-RFI-WG-C-2605-00
KAIG3-RFI-WG-C-2604 00 KAIG3-RFI-WG-C-2604-00
KAIG3-RFI-PG-C-2596 00 KAIG3-RFI-PG-C-2596-00
KAIG3-RFI-ZG-LS-0881 00 KAIG3-RFI-ZG-LS-0881-00
KAIG3-RFI-MB-A-0722 00 KAIG3-RFI-MB-A-0722-00
KAIG3-RFI-MB-A-0721 00 KAIG3-RFI-MB-A-0721-00
KAIG3-RFI-AG-S-5985 00 KAIG3-RFI-AG-S-5985-00
KAIG3-RFI-SG-S-5977 00 KAIG3-RFI-SG-S-5977-00
KAIG3-RFI-ZG-C-2595 00 KAIG3-RFI-ZG-C-2595-00
KAIG3-RFI-PG-C-2594 00 KAIG3-RFI-PG-C-2594-00
KAIG3-RFI-WG-LS-0880 00 KAIG3-RFI-WG-LS-0880-00
KAIG3-RFI-WG-LS-0879 00 KAIG3-RFI-WG-LS-0879-00
KAIG3-RFI-WG-C-2593 00 KAIG3-RFI-WG-C-2593-00
KAIG3-RFI-SW-LS-0888 00 KAIG3-RFI-SW-LS-0888-00
KAIG3-RFI-SW-LS-0887 00 KAIG3-RFI-SW-LS-0887-00
KAIG3-RFI-SW-LS-0886 00 KAIG3-RFI-SW-LS-0886-00
KAIG3-RFI-SW-LS-0885 00 KAIG3-RFI-SW-LS-0885-00
KAIG3-RFI-SW-LS-0884 00 KAIG3-RFI-SW-LS-0884-00
KAIG3-RFI-SW-LS-0883 00 KAIG3-RFI-SW-LS-0883-00
KAIG3-RFI-SW-C-2616 00 KAIG3-RFI-SW-C-2616-00
KAIG3-RFI-SW-C-2615 00 KAIG3-RFI-SW-C-2615-00
KAIG3-RFI-SW-C-2614 00 KAIG3-RFI-SW-C-2614-00
KAIG3-RFI-SW-C-2613 00 KAIG3-RFI-SW-C-2613-00
KAIG3-RFI-SW-C-2612 00 KAIG3-RFI-SW-C-2612-00
KAIG3-RFI-SW-C-2558 00 KAIG3-RFI-SW-C-2558-00
KAIG3-RFI-SW-C-2611 00 KAIG3-RFI-SW-C-2611-00
KAIG3-RFI-SW-C-2610 00 KAIG3-RFI-SW-C-2610-00
KAIG3-RFI-SW-C-2609 00 KAIG3-RFI-SW-C-2609-00
KAIG3-RFI-SW-C-2608 00 KAIG3-RFI-SW-C-2608-00
KAIG3-RFI-SW-C-2607 00 KAIG3-RFI-SW-C-2607-00
KAIG3-RFI-SW-C-2606 00 KAIG3-RFI-SW-C-2606-00
KAIG3-RFI-SW-C-2586 00 KAIG3-RFI-SW-C-2586-00
KAIG3-RFI-NR-S-5988 00 KAIG3-RFI-NR-S-5988-00
KAIG3-RFI-NR-S-5987 00 KAIG3-RFI-NR-S-5987-00
KAIG3-RFI-CO-S-5984 00 KAIG3-RFI-CO-S-5984-00
KAIG3-RFI-CO-S-5983 00 KAIG3-RFI-CO-S-5983-00
KAIG3-RFI-CO-S-5982 00 KAIG3-RFI-CO-S-5982-00
KAIG3-RFI-CO-S-5981 00 KAIG3-RFI-CO-S-5981-00
KAIG3-RFI-CO-S-5980 00 KAIG3-RFI-CO-S-5980-00
KAIG3-RFI-CO-S-5979 00 KAIG3-RFI-CO-S-5979-00
KAIG3-RFI-CO-S-5978 00 KAIG3-RFI-CO-S-5978-00
KAIG3-RFI-SW-C-2585 00 KAIG3-RFI-SW-C-2585-00
KAIG3-RFI-SW-C-2584 00 KAIG3-RFI-SW-C-2584-00
KAIG3-RFI-SW-C-2583 00 KAIG3-RFI-SW-C-2583-00
KAIG3-RFI-SW-C-2582 00 KAIG3-RFI-SW-C-2582-00
KAIG3-RFI-SW-C-2581 00 KAIG3-RFI-SW-C-2581-00
KAIG3-RFI-SW-C-2580 00 KAIG3-RFI-SW-C-2580-00
KAIG3-RFI-PA-C-2603 00 KAIG3-RFI-PA-C-2603-00
KAIG3-RFI-PA-C-2602 00 KAIG3-RFI-PA-C-2602-00
KAIG3-RFI-PA-C-2587 00 KAIG3-RFI-PA-C-2587-00
KAIG3-RFI-SW-C-2524 00 KAIG3-RFI-SW-C-2524-00
KAIG3-RFI-SW-C-2512 00 KAIG3-RFI-SW-C-2512-00
KAIG3-RFI-WG-C-2592 00 KAIG3-RFI-WG-C-2592-00
KAIG3-RFI-WG-C-2591 00 KAIG3-RFI-WG-C-2591-00
KAIG3-RFI-WG-C-2590 00 KAIG3-RFI-WG-C-2590-00
KAIG3-RFI-DG-C-2589 00 KAIG3-RFI-DG-C-2589-00
KAIG3-RFI-DG-C-2588 00 KAIG3-RFI-DG-C-2588-00
KAIG3-RFI-DG-C-2577 00 KAIG3-RFI-DG-C-2577-00
KAIG3-RFI-PG-C-2576 00 KAIG3-RFI-PG-C-2576-00
KAIG3-RFI-PC-LC-0366 00 KAIG3-RFI-PC-LC-0366-00
KAIG3-RFI-PG-S-5966 00 KAIG3-RFI-PG-S-5966-00
KAIG3-RFI-PC-LC-0365 00 KAIG3-RFI-PC-LC-0365-00
KAIG3-RFI-PC-LC-0364 00 KAIG3-RFI-PC-LC-0364-00
KAIG3-RFI-CO-C-2601 00 KAIG3-RFI-CO-C-2601-00
KAIG3-RFI-CO-C-2600 00 KAIG3-RFI-CO-C-2600-00
KAIG3-RFI-CO-C-2599 00 KAIG3-RFI-CO-C-2599-00
KAIG3-RFI-MC-C-2598 00 KAIG3-RFI-MC-C-2598-00
KAIG3-RFI-CO-C-2597 00 KAIG3-RFI-CO-C-2597-00
KAIG3-RFI-CO-SU-2078 00 KAIG3-RFI-CO-SU-2078-00
KAIG3-RFI-SA-SU-2076 00 KAIG3-RFI-SA-SU-2076-00
KAIG3-RFI-CO-SU-2077 00 KAIG3-RFI-CO-SU-2077-00
KAIG3-RFI-CO-S-5874 01 KAIG3-RFI-CO-S-5874-01
KAIG3-RFI-CO-S-5976 00 KAIG3-RFI-CO-S-5976-00
KAIG3-RFI-CO-S-5975 00 KAIG3-RFI-CO-S-5975-00
KAIG3-RFI-CO-SU-2057 01 KAIG3-RFI-CO-SU-2057-01
KAIG3-RFI-WG-C-2575 00 KAIG3-RFI-WG-C-2575-00
KAIG3-RFI-WG-C-2366 01 KAIG3-RFI-WG-C-2366-01
KAIG3-RFI-MB-A-0720 00 KAIG3-RFI-MB-A-0720-00
KAIG3-RFI-MB-A-0719 00 KAIG3-RFI-MB-A-0719-00
KAIG3-RFI-SG-C-2550 00 KAIG3-RFI-SG-C-2550-00
KAIG3-RFI-ZG-C-2549 00 KAIG3-RFI-ZG-C-2549-00
KAIG3-RFI-ZG-C-2548 00 KAIG3-RFI-ZG-C-2548-00
KAIG3-RFI-ZG-A-0718 00 KAIG3-RFI-ZG-A-0718-00
KAIG3-RFI-PG-S-5965 00 KAIG3-RFI-PG-S-5965-00
KAIG3-RFI-PG-S-5964-00 00 KAIG3-RFI-PG-S-5964-00-00
KAIG3-RFI-PG-S-5963 00 KAIG3-RFI-PG-S-5963-00
KAIG3-RFI-PG-S-5962 00 KAIG3-RFI-PG-S-5962-00
KAIG3-RFI-PG-S-5961 00 KAIG3-RFI-PG-S-5961-00
KAIG3-RFI-SW-LS-0878 00 KAIG3-RFI-SW-LS-0878-00
KAIG3-RFI-SW-C-2579 00 KAIG3-RFI-SW-C-2579-00
KAIG3-RFI-SW-C-2578 00 KAIG3-RFI-SW-C-2578-00
KAIG3-RFI-SW-C-2570 00 KAIG3-RFI-SW-C-2570-00
KAIG3-RFI-SW-C-2569 00 KAIG3-RFI-SW-C-2569-00
KAIG3-RFI-SW-C-2568 00 KAIG3-RFI-SW-C-2568-00
KAIG3-RFI-SW-C-2567 00 KAIG3-RFI-SW-C-2567-00
KAIG3-RFI-SW-C-2566 00 KAIG3-RFI-SW-C-2566-00
KAIG3-RFI-SW-C-2565 00 KAIG3-RFI-SW-C-2565-00
KAIG3-RFI-SW-C-2564 00 KAIG3-RFI-SW-C-2564-00
KAIG3-RFI-SW-C-2563 00 KAIG3-RFI-SW-C-2563-00
KAIG3-RFI-SW-C-2562 00 KAIG3-RFI-SW-C-2562-00
KAIG3-RFI-SW-C-2561 00 KAIG3-RFI-SW-C-2561-00
KAIG3-RFI-MC-SU-2075 00 KAIG3-RFI-MC-SU-2075-00
KAIG3-RFI-MC-S-5974 00 KAIG3-RFI-MC-S-5974-00
KAIG3-RFI-MC-S-5973 00 KAIG3-RFI-MC-S-5973-00
KAIG3-RFI-MC-S-5972 00 KAIG3-RFI-MC-S-5972-00
KAIG3-RFI-CO-SU-2074 00 KAIG3-RFI-CO-SU-2074-00
KAIG3-RFI-CO-SU-1992 00 KAIG3-RFI-CO-SU-1992-00
KAIG3-RFI-CO-S-5971 00 KAIG3-RFI-CO-S-5971-00
KAIG3-RFI-CO-S-5970 00 KAIG3-RFI-CO-S-5970-00
KAIG3-RFI-CO-S-5969 00 KAIG3-RFI-CO-S-5969-00
KAIG3-RFI-CO-S-5968 00 KAIG3-RFI-CO-S-5968-00
KAIG3-RFI-CO-S-5967 00 KAIG3-RFI-CO-S-5967-00
KAIG3-RFI-CO-S-5663 00 KAIG3-RFI-CO-S-5663-00
KAIG3-RFI-CO-S-5662 00 KAIG3-RFI-CO-S-5662-00
KAIG3-RFI-CO-C-2574 00 KAIG3-RFI-CO-C-2574-00
KAIG3-RFI-CO-C-2573 00 KAIG3-RFI-CO-C-2573-00
KAIG3-RFI-MC-C-2572 00 KAIG3-RFI-MC-C-2572-00
KAIG3-RFI-CO-C-2571 00 KAIG3-RFI-CO-C-2571-00
KAIG3-RFI-AG-LC-0367 00 KAIG3-RFI-AG-LC-0367-00
KAIG3-RFI-PC-E-0347 00 KAIG3-RFI-PC-E-0347-00
KAIG3-RFI-SW-E-0345 00 KAIG3-RFI-SW-E-0345-00
KAIG3-RFI-WG-C-2293 01 KAIG3-RFI-WG-C-2293-01
KAIG3-RFI-WG-C-2547 00 KAIG3-RFI-WG-C-2547-00
KAIG3-RFI-WG-C-2546 00 KAIG3-RFI-WG-C-2546-00
KAIG3-RFI-WG-C-2545 00 KAIG3-RFI-WG-C-2545-00
KAIG3-RFI-WG-C-2544 00 KAIG3-RFI-WG-C-2544-00
KAIG3-RFI-WG-C-2543 00 KAIG3-RFI-WG-C-2543-00
KAIG3-RFI-PG-C-2522 00 KAIG3-RFI-PG-C-2522-00
KAIG3-RFI-PA-C-2555 00 KAIG3-RFI-PA-C-2555-00
KAIG3-RFI-SG-S-5960 00 KAIG3-RFI-SG-S-5960-00
KAIG3-RFI-ZG-A-0717 00 KAIG3-RFI-ZG-A-0717-00
KAIG3-RFI-ZG-A-0716 00 KAIG3-RFI-ZG-A-0716-00
KAIG3-RFI-SW-LS-0877 00 KAIG3-RFI-SW-LS-0877-00
KAIG3-RFI-SW-LS-0876 00 KAIG3-RFI-SW-LS-0876-00
KAIG3-RFI-SW-C-2559 00 KAIG3-RFI-SW-C-2559-00
KAIG3-RFI-ZG-S-5941 00 KAIG3-RFI-ZG-S-5941-00
KAIG3-RFI-SW-C-2557 00 KAIG3-RFI-SW-C-2557-00
KAIG3-RFI-SW-C-2556 00 KAIG3-RFI-SW-C-2556-00
KAIG3-RFI-SW-C-2554 00 KAIG3-RFI-SW-C-2554-00
KAIG3-RFI-SW-C-2553 00 KAIG3-RFI-SW-C-2553-00
KAIG3-RFI-AG-SS-0032 00 KAIG3-RFI-AG-SS-0032-00
KAIG3-RFI-SW-C-2552 00 KAIG3-RFI-SW-C-2552-00
KAIG3-RFI-SW-C-2551 00 KAIG3-RFI-SW-C-2551-00
KAIG3-RFI-SW-C-2542 00 KAIG3-RFI-SW-C-2542-00
KAIG3-RFI-SW-C-2541 00 KAIG3-RFI-SW-C-2541-00
KAIG3-RFI-SW-C-2540 00 KAIG3-RFI-SW-C-2540-00
KAIG3-RFI-SW-C-2539 00 KAIG3-RFI-SW-C-2539-00
KAIG3-RFI-SW-C-2538 00 KAIG3-RFI-SW-C-2538-00
KAIG3-RFI-SW-C-2537 00 KAIG3-RFI-SW-C-2537-00
KAIG3-RFI-SW-C-2536 00 KAIG3-RFI-SW-C-2536-00
KAIG3-RFI-SW-C-2535 00 KAIG3-RFI-SW-C-2535-00
KAIG3-RFI-SW-C-2534 00 KAIG3-RFI-SW-C-2534-00
KAIG3-RFI-SW-C-1907 00 KAIG3-RFI-SW-C-1907-00
KAIG3-RFI-CO-SU-2073 00 KAIG3-RFI-CO-SU-2073-00
KAIG3-RFI-CO-SU-2072 00 KAIG3-RFI-CO-SU-2072-00
KAIG3-RFI-SW-C-2560 00 KAIG3-RFI-SW-C-2560-00
KAIG3-RFI-CO-SU-2071 00 KAIG3-RFI-CO-SU-2071-00
KAIG3-RFI-CO-SU-2070 00 KAIG3-RFI-CO-SU-2070-00
KAIG3-RFI-CO-SU-2069 00 KAIG3-RFI-CO-SU-2069-00
KAIG3-RFI-CO-SS-0033 00 KAIG3-RFI-CO-SS-0033-00
KAIG3-RFI-CO-S-5958 00 KAIG3-RFI-CO-S-5958-00
KAIG3-RFI-CO-S-5957 00 KAIG3-RFI-CO-S-5957-00
KAIG3-RFI-CO-S-5956 00 KAIG3-RFI-CO-S-5956-00
KAIG3-RFI-CO-S-5955 00 KAIG3-RFI-CO-S-5955-00
KAIG3-RFI-CO-S-5954 00 KAIG3-RFI-CO-S-5954-00
KAIG3-RFI-CO-S-5953 00 KAIG3-RFI-CO-S-5953-00
KAIG3-RFI-CO-S-5952 00 KAIG3-RFI-CO-S-5952-00
KAIG3-RFI-CO-S-5951 00 KAIG3-RFI-CO-S-5951-00
KAIG3-RFI-CO-S-5950 00 KAIG3-RFI-CO-S-5950-00
KAIG3-RFI-CO-S-5949 00 KAIG3-RFI-CO-S-5949-00
KAIG3-RFI-CO-S-5948 00 KAIG3-RFI-CO-S-5948-00
KAIG3-RFI-CO-S-5946 00 KAIG3-RFI-CO-S-5946-00
KAIG3-RFI-SW-P-0165 02 KAIG3-RFI-SW-P-0165-02
KAIG3-RFI-AG-S-5940 00 KAIG3-RFI-AG-S-5940-00
KAIG3-RFI-AG-SU-2066 00 KAIG3-RFI-AG-SU-2066-00
KAIG3-RFI-AG-SS-0031 00 KAIG3-RFI-AG-SS-0031-00
KAIG3-RFI-WG-LS-0875 00 KAIG3-RFI-WG-LS-0875-00
KAIG3-RFI-WG-LS-0874 00 KAIG3-RFI-WG-LS-0874-00
KAIG3-RFI-SW-LC-0361 00 KAIG3-RFI-SW-LC-0361-00
KAIG3-RFI-WG-LS-0873 00 KAIG3-RFI-WG-LS-0873-00
KAIG3-RFI-WG-LS-0867 00 KAIG3-RFI-WG-LS-0867-00
KAIG3-RFI-WG-LS-0862 00 KAIG3-RFI-WG-LS-0862-00
KAIG3-RFI-WG-LS-0872 00 KAIG3-RFI-WG-LS-0872-00
KAIG3-RFI-WG-LS-0871 00 KAIG3-RFI-WG-LS-0871-00
KAIG3-RFI-WG-C-2521 00 KAIG3-RFI-WG-C-2521-00
KAIG3-RFI-WG-C-2520 00 KAIG3-RFI-WG-C-2520-00
KAIG3-RFI-WG-LS-0870 00 KAIG3-RFI-WG-LS-0870-00
KAIG3-RFI-WG-LS-0869 00 KAIG3-RFI-WG-LS-0869-00
KAIG3-RFI-WG-LS-0868 00 KAIG3-RFI-WG-LS-0868-00
KAIG3-RFI-WG-C-2519 00 KAIG3-RFI-WG-C-2519-00
KAIG3-RFI-WG-C-2518 00 KAIG3-RFI-WG-C-2518-00
KAIG3-RFI-WG-C-2517 00 KAIG3-RFI-WG-C-2517-00
KAIG3-RFI-WG-C-2500 00 KAIG3-RFI-WG-C-2500-00
KAIG3-RFI-WG-C-2499 00 KAIG3-RFI-WG-C-2499-00
KAIG3-RFI-WG-C-2480 00 KAIG3-RFI-WG-C-2480-00
KAIG3-RFI-WG-LS-0861 00 KAIG3-RFI-WG-LS-0861-00
KAIG3-RFI-WG-LS-0860 00 KAIG3-RFI-WG-LS-0860-00
KAIG3-RFI-WG-LS-0859 00 KAIG3-RFI-WG-LS-0859-00
KAIG3-RFI-AG-SU-2067 00 KAIG3-RFI-AG-SU-2067-00
KAIG3-RFI-WG-LS-0858 00 KAIG3-RFI-WG-LS-0858-00
KAIG3-RFI-ZG-LS-0857 00 KAIG3-RFI-ZG-LS-0857-00
KAIG3-RFI-ZG-LS-0856 00 KAIG3-RFI-ZG-LS-0856-00
KAIG3-RFI-PG-LS-0855 00 KAIG3-RFI-PG-LS-0855-00
KAIG3-RFI-DG-LS-0854 00 KAIG3-RFI-DG-LS-0854-00
KAIG3-RFI-DG-LS-0853 00 KAIG3-RFI-DG-LS-0853-00
KAIG3-RFI-AG-S-5939 00 KAIG3-RFI-AG-S-5939-00
KAIG3-RFI-WG-S-5938 00 KAIG3-RFI-WG-S-5938-00
KAIG3-RFI-WG-LS-0852 00 KAIG3-RFI-WG-LS-0852-00
KAIG3-RFI-WG-LS-0850 00 KAIG3-RFI-WG-LS-0850-00
KAIG3-RFI-DG-LC-0363 00 KAIG3-RFI-DG-LC-0363-00
KAIG3-RFI-DG-LC-0362 00 KAIG3-RFI-DG-LC-0362-00
KAIG3-RFI-WG-E-0344 00 KAIG3-RFI-WG-E-0344-00
KAIG3-RFI-WG-E-0343 00 KAIG3-RFI-WG-E-0343-00
KAIG3-RFI-SW-LS-0866 00 KAIG3-RFI-SW-LS-0866-00
KAIG3-RFI-SW-LS-0865 00 KAIG3-RFI-SW-LS-0865-00
KAIG3-RFI-SW-LS-0864 00 KAIG3-RFI-SW-LS-0864-00
KAIG3-RFI-SW-LS-0863 00 KAIG3-RFI-SW-LS-0863-00
KAIG3-RFI-SW-C-2533 00 KAIG3-RFI-SW-C-2533-00
KAIG3-RFI-SW-C-2532 00 KAIG3-RFI-SW-C-2532-00
KAIG3-RFI-SW-P-0181 00 KAIG3-RFI-SW-P-0181-00
KAIG3-RFI-SW-C-2531 00 KAIG3-RFI-SW-C-2531-00
KAIG3-RFI-SW-C-2530 00 KAIG3-RFI-SW-C-2530-00
KAIG3-RFI-SW-C-2529 00 KAIG3-RFI-SW-C-2529-00
KAIG3-RFI-SW-C-2528 00 KAIG3-RFI-SW-C-2528-00
KAIG3-RFI-SW-C-2527 00 KAIG3-RFI-SW-C-2527-00
KAIG3-RFI-SW-C-2526 00 KAIG3-RFI-SW-C-2526-00
KAIG3-RFI-SW-C-2525 00 KAIG3-RFI-SW-C-2525-00
KAIG3-RFI-SW-C-2523 00 KAIG3-RFI-SW-C-2523-00
KAIG3-RFI-SW-C-2515 00 KAIG3-RFI-SW-C-2515-00
KAIG3-RFI-SW-C-2514 00 KAIG3-RFI-SW-C-2514-00
KAIG3-RFI-SW-C-2513 00 KAIG3-RFI-SW-C-2513-00
KAIG3-RFI-SW-C-2511 00 KAIG3-RFI-SW-C-2511-00
KAIG3-RFI-SW-C-2510 00 KAIG3-RFI-SW-C-2510-00
KAIG3-RFI-SW-C-2509 00 KAIG3-RFI-SW-C-2509-00
KAIG3-RFI-SW-C-2507 00 KAIG3-RFI-SW-C-2507-00
KAIG3-RFI-SW-C-2506 00 KAIG3-RFI-SW-C-2506-00
KAIG3-RFI-SW-C-2505 00 KAIG3-RFI-SW-C-2505-00
KAIG3-RFI-SW-C-2504 00 KAIG3-RFI-SW-C-2504-00
KAIG3-RFI-SW-C-2503 00 KAIG3-RFI-SW-C-2503-00
KAIG3-RFI-SW-C-2502 00 KAIG3-RFI-SW-C-2502-00
KAIG3-RFI-SW-C-2501 00 KAIG3-RFI-SW-C-2501-00
KAIG3-RFI-CO-C-2516 00 KAIG3-RFI-CO-C-2516-00
KAIG3-RFI-CO-S-5945 00 KAIG3-RFI-CO-S-5945-00
KAIG3-RFI-CO-S-5942 00 KAIG3-RFI-CO-S-5942-00
KAIG3-RFI-SW-C-2498 00 KAIG3-RFI-SW-C-2498-00
KAIG3-RFI-SW-C-2497 00 KAIG3-RFI-SW-C-2497-00
KAIG3-RFI-SW-C-2496 00 KAIG3-RFI-SW-C-2496-00
KAIG3-RFI-SW-C-2494 00 KAIG3-RFI-SW-C-2494-00
KAIG3-RFI-SW-C-2493 00 KAIG3-RFI-SW-C-2493-00
KAIG3-RFI-SW-C-2492 00 KAIG3-RFI-SW-C-2492-00
KAIG3-RFI-SW-C-2491 00 KAIG3-RFI-SW-C-2491-00
KAIG3-RFI-SW-C-2490 00 KAIG3-RFI-SW-C-2490-00
KAIG3-RFI-SW-C-2489 00 KAIG3-RFI-SW-C-2489-00
KAIG3-RFI-SW-C-2488 00 KAIG3-RFI-SW-C-2488-00
KAIG3-RFI-SW-C-2487 00 KAIG3-RFI-SW-C-2487-00
KAIG3-RFI-WG-LS-0849 00 KAIG3-RFI-WG-LS-0849-00
KAIG3-RFI-WG-C-2479 00 KAIG3-RFI-WG-C-2479-00
KAIG3-RFI-WG-C-2478 00 KAIG3-RFI-WG-C-2478-00
KAIG3-RFI-WG-C-2477 00 KAIG3-RFI-WG-C-2477-00
KAIG3-RFI-WG-C-2472 00 KAIG3-RFI-WG-C-2472-00
KAIG3-RFI-SG-C-2474 00 KAIG3-RFI-SG-C-2474-00
KAIG3-RFI-DG-C-2473 00 KAIG3-RFI-DG-C-2473-00
KAIG3-RFI-WG-SU-2065 00 KAIG3-RFI-WG-SU-2065-00
KAIG3-RFI-WG-S-5929 00 KAIG3-RFI-WG-S-5929-00
KAIG3-RFI-ZG-C-1953 01 KAIG3-RFI-ZG-C-1953-01
KAIG3-RFI-SG-C-2471 00 KAIG3-RFI-SG-C-2471-00
KAIG3-RFI-SG-C-2476 00 KAIG3-RFI-SG-C-2476-00
KAIG3-RFI-WG-LS-0848 00 KAIG3-RFI-WG-LS-0848-00
KAIG3-RFI-ZG-C-2475 00 KAIG3-RFI-ZG-C-2475-00
KAIG3-RFI-WG-LS-0847 00 KAIG3-RFI-WG-LS-0847-00
KAIG3-RFI-WG-LS-0833 00 KAIG3-RFI-WG-LS-0833-00
KAIG3-RFI-WG-C-2453 00 KAIG3-RFI-WG-C-2453-00
KAIG3-RFI-SW-LS-0851 00 KAIG3-RFI-SW-LS-0851-00
KAIG3-RFI-SW-LS-0846 00 KAIG3-RFI-SW-LS-0846-00
KAIG3-RFI-SW-LS-0845 00 KAIG3-RFI-SW-LS-0845-00
KAIG3-RFI-SW-C-2486 00 KAIG3-RFI-SW-C-2486-00
KAIG3-RFI-SW-C-2485 00 KAIG3-RFI-SW-C-2485-00
KAIG3-RFI-SW-C-2484 00 KAIG3-RFI-SW-C-2484-00
KAIG3-RFI-SW-C-2470 00 KAIG3-RFI-SW-C-2470-00
KAIG3-RFI-SW-C-2469 00 KAIG3-RFI-SW-C-2469-00
KAIG3-RFI-SW-C-2468 00 KAIG3-RFI-SW-C-2468-00
KAIG3-RFI-SW-C-2467 00 KAIG3-RFI-SW-C-2467-00
KAIG3-RFI-SW-C-2466 00 KAIG3-RFI-SW-C-2466-00
KAIG3-RFI-SW-C-2465 00 KAIG3-RFI-SW-C-2465-00
KAIG3-RFI-SW-C-2464 00 KAIG3-RFI-SW-C-2464-00
KAIG3-RFI-SW-C-2463 00 KAIG3-RFI-SW-C-2463-00
KAIG3-RFI-SW-C-2044 01 KAIG3-RFI-SW-C-2044-01
KAIG3-RFI-CO-C-2483 00 KAIG3-RFI-CO-C-2483-00
KAIG3-RFI-CO-C-2482 00 KAIG3-RFI-CO-C-2482-00
KAIG3-RFI-CO-C-2381 00 KAIG3-RFI-CO-C-2381-00
KAIG3-RFI-CO-SU-2064 00 KAIG3-RFI-CO-SU-2064-00
KAIG3-RFI-CO-S-5864 01 KAIG3-RFI-CO-S-5864-01
KAIG3-RFI-CO-S-5937 00 KAIG3-RFI-CO-S-5937-00
KAIG3-RFI-CO-S-5936 00 KAIG3-RFI-CO-S-5936-00
KAIG3-RFI-MC-S-5935 00 KAIG3-RFI-MC-S-5935-00
KAIG3-RFI-SW-E-0341-00 00 KAIG3-RFI-SW-E-0341-00-00
KAIG3-RFI-WG-C-2232 01 KAIG3-RFI-WG-C-2232-01
KAIG3-RFI-WG-C-2452 00 KAIG3-RFI-WG-C-2452-00
KAIG3-RFI-WG-C-2451 00 KAIG3-RFI-WG-C-2451-00
KAIG3-RFI-WG-C-2450 00 KAIG3-RFI-WG-C-2450-00
KAIG3-RFI-WG-C-2449 00 KAIG3-RFI-WG-C-2449-00
KAIG3-RFI-WG-C-2448 00 KAIG3-RFI-WG-C-2448-00
KAIG3-RFI-WG-C-2447 00 KAIG3-RFI-WG-C-2447-00
KAIG3-RFI-WG-C-2446 00 KAIG3-RFI-WG-C-2446-00
KAIG3-RFI-ZG-S-5916 00 KAIG3-RFI-ZG-S-5916-00
KAIG3-RFI-PG-C-2455 00 KAIG3-RFI-PG-C-2455-00
KAIG3-RFI-PG-C-2454 00 KAIG3-RFI-PG-C-2454-00
KAIG3-RFI-MB-A-0715 00 KAIG3-RFI-MB-A-0715-00
KAIG3-RFI-MB-A-0714 00 KAIG3-RFI-MB-A-0714-00
KAIG3-RFI-MB-A-0713 00 KAIG3-RFI-MB-A-0713-00
KAIG3-RFI-MC-SU-2062 00 KAIG3-RFI-MC-SU-2062-00
KAIG3-RFI-MC-SU-2061 00 KAIG3-RFI-MC-SU-2061-00
KAIG3-RFI-CO-SS-0030 00 KAIG3-RFI-CO-SS-0030-00
KAIG3-RFI-CO-S-5643 01 KAIG3-RFI-CO-S-5643-01
KAIG3-RFI-MC-S-5866 01 KAIG3-RFI-MC-S-5866-01
KAIG3-RFI-CO-S-5933 00 KAIG3-RFI-CO-S-5933-00
KAIG3-RFI-MC-S-5932 00 KAIG3-RFI-MC-S-5932-00
KAIG3-RFI-MC-S-5931 00 KAIG3-RFI-MC-S-5931-00
KAIG3-RFI-SW-LS-0844 00 KAIG3-RFI-SW-LS-0844-00
KAIG3-RFI-SW-LS-0843 00 KAIG3-RFI-SW-LS-0843-00
KAIG3-RFI-SW-LS-0842 00 KAIG3-RFI-SW-LS-0842-00
KAIG3-RFI-SW-LS-0841 00 KAIG3-RFI-SW-LS-0841-00
KAIG3-RFI-SW-LS-0840 00 KAIG3-RFI-SW-LS-0840-00
KAIG3-RFI-SW-LS-0839 00 KAIG3-RFI-SW-LS-0839-00
KAIG3-RFI-SW-LS-0838 00 KAIG3-RFI-SW-LS-0838-00
KAIG3-RFI-SW-C-2462 00 KAIG3-RFI-SW-C-2462-00
KAIG3-RFI-SW-C-2461 00 KAIG3-RFI-SW-C-2461-00
KAIG3-RFI-SW-C-2460 00 KAIG3-RFI-SW-C-2460-00
KAIG3-RFI-SW-C-2459 00 KAIG3-RFI-SW-C-2459-00
KAIG3-RFI-SW-C-2458 00 KAIG3-RFI-SW-C-2458-00
KAIG3-RFI-SW-C-2457 00 KAIG3-RFI-SW-C-2457-00
KAIG3-RFI-SW-C-2456 00 KAIG3-RFI-SW-C-2456-00
KAIG3-RFI-SW-C-2445 00 KAIG3-RFI-SW-C-2445-00
KAIG3-RFI-SW-C-2444 00 KAIG3-RFI-SW-C-2444-00
KAIG3-RFI-SW-C-2443 00 KAIG3-RFI-SW-C-2443-00
KAIG3-RFI-CO-S-5930 00 KAIG3-RFI-CO-S-5930-00
KAIG3-RFI-SW-E-0342 00 KAIG3-RFI-SW-E-0342-00
KAIG3-RFI-SW-C-2442 00 KAIG3-RFI-SW-C-2442-00
KAIG3-RFI-SW-C-2440 00 KAIG3-RFI-SW-C-2440-00
KAIG3-RFI-SW-C-2439 00 KAIG3-RFI-SW-C-2439-00
KAIG3-RFI-CO-S-5920 00 KAIG3-RFI-CO-S-5920-00
KAIG3-RFI-SW-C-2275 01 KAIG3-RFI-SW-C-2275-01
KAIG3-RFI-SW-C-2202 01 KAIG3-RFI-SW-C-2202-01
KAIG3-RFI-CO-S-5853 00 KAIG3-RFI-CO-S-5853-00
KAIG3-RFI-SW-E-0335 01 KAIG3-RFI-SW-E-0335-01
KAIG3-RFI-WG-C-2434 00 KAIG3-RFI-WG-C-2434-00
KAIG3-RFI-WG-C-2432 00 KAIG3-RFI-WG-C-2432-00
KAIG3-RFI-WG-C-2431 00 KAIG3-RFI-WG-C-2431-00
KAIG3-RFI-WG-C-2430 00 KAIG3-RFI-WG-C-2430-00
KAIG3-RFI-WG-C-2433 00 KAIG3-RFI-WG-C-2433-00
KAIG3-RFI-WG-C-2429 00 KAIG3-RFI-WG-C-2429-00
KAIG3-RFI-WG-C-2419 00 KAIG3-RFI-WG-C-2419-00
KAIG3-RFI-WG-C-2418 00 KAIG3-RFI-WG-C-2418-00
KAIG3-RFI-AG-S-5727 01 KAIG3-RFI-AG-S-5727-01
KAIG3-RFI-ZG-S-5928 00 KAIG3-RFI-ZG-S-5928-00
KAIG3-RFI-PG-C-2410 00 KAIG3-RFI-PG-C-2410-00
KAIG3-RFI-AG-S-5927 00 KAIG3-RFI-AG-S-5927-00
KAIG3-RFI-SG-S-5922 00 KAIG3-RFI-SG-S-5922-00
KAIG3-RFI-SG-C-2409 00 KAIG3-RFI-SG-C-2409-00
KAIG3-RFI-DG-A-0712 00 KAIG3-RFI-DG-A-0712-00
KAIG3-RFI-MB-A-0711 00 KAIG3-RFI-MB-A-0711-00
KAIG3-RFI-MB-A-0710 00 KAIG3-RFI-MB-A-0710-00
KAIG3-RFI-AG-SS-0026 01 KAIG3-RFI-AG-SS-0026-01
KAIG3-RFI-CO-SU-2060 00 KAIG3-RFI-CO-SU-2060-00
KAIG3-RFI-CO-SU-2059 00 KAIG3-RFI-CO-SU-2059-00
KAIG3-RFI-SW-LS-0837 00 KAIG3-RFI-SW-LS-0837-00
KAIG3-RFI-CO-SU-2058 00 KAIG3-RFI-CO-SU-2058-00
KAIG3-RFI-SW-LS-0836 00 KAIG3-RFI-SW-LS-0836-00
KAIG3-RFI-CO-SS-0029 00 KAIG3-RFI-CO-SS-0029-00
KAIG3-RFI-SW-C-2437 00 KAIG3-RFI-SW-C-2437-00
KAIG3-RFI-MC-C-2438 00 KAIG3-RFI-MC-C-2438-00
KAIG3-RFI-SW-C-2436 00 KAIG3-RFI-SW-C-2436-00
KAIG3-RFI-CO-C-2436 00 KAIG3-RFI-CO-C-2436-00
KAIG3-RFI-SW-C-2435 00 KAIG3-RFI-SW-C-2435-00
KAIG3-RFI-SW-C-2428 00 KAIG3-RFI-SW-C-2428-00
KAIG3-RFI-CO-S-5924 00 KAIG3-RFI-CO-S-5924-00
KAIG3-RFI-SW-C-2427 00 KAIG3-RFI-SW-C-2427-00
KAIG3-RFI-SW-C-2417 00 KAIG3-RFI-SW-C-2417-00
KAIG3-RFI-CO-S-5923 00 KAIG3-RFI-CO-S-5923-00
KAIG3-RFI-SW-C-2416 00 KAIG3-RFI-SW-C-2416-00
KAIG3-RFI-SW-C-2415 00 KAIG3-RFI-SW-C-2415-00
KAIG3-RFI-CO-S-5683 01 KAIG3-RFI-CO-S-5683-01
KAIG3-RFI-CO-S-5682 01 KAIG3-RFI-CO-S-5682-01
KAIG3-RFI-CO-S-5681 01 KAIG3-RFI-CO-S-5681-01
KAIG3-RFI-SW-C-2414 00 KAIG3-RFI-SW-C-2414-00
KAIG3-RFI-SW-C-2413 00 KAIG3-RFI-SW-C-2413-00
KAIG3-RFI-SW-C-2412 00 KAIG3-RFI-SW-C-2412-00
KAIG3-RFI-CO-S-5921 00 KAIG3-RFI-CO-S-5921-00
KAIG3-RFI-CO-S-5919 00 KAIG3-RFI-CO-S-5919-00
KAIG3-RFI-CO-S-5918 00 KAIG3-RFI-CO-S-5918-00
KAIG3-RFI-CO-S-5917 00 KAIG3-RFI-CO-S-5917-00
KAIG3-RFI-SW-C-2425 00 KAIG3-RFI-SW-C-2425-00
KAIG3-RFI-SW-C-2424 00 KAIG3-RFI-SW-C-2424-00
KAIG3-RFI-SW-C-2423 00 KAIG3-RFI-SW-C-2423-00
KAIG3-RFI-SW-C-2422 00 KAIG3-RFI-SW-C-2422-00
KAIG3-RFI-SW-C-2421 00 KAIG3-RFI-SW-C-2421-00
KAIG3-RFI-SW-C-2420 00 KAIG3-RFI-SW-C-2420-00
KAIG3-RFI-SW-P-0165 01 KAIG3-RFI-SW-P-0165-01
KAIG3-RFI-SW-C-2383 00 KAIG3-RFI-SW-C-2383-00
KAIG3-RFI-SW-C-2382 00 KAIG3-RFI-SW-C-2382-00
KAIG3-RFI-SW-C-2381 00 KAIG3-RFI-SW-C-2381-00
KAIG3-RFI-SW-C-2380 00 KAIG3-RFI-SW-C-2380-00
KAIG3-RFI-SW-C-2379 00 KAIG3-RFI-SW-C-2379-00
KAIG3-RFI-SW-C-2378 00 KAIG3-RFI-SW-C-2378-00
KAIG3-RFI-SW-C-2377 00 KAIG3-RFI-SW-C-2377-00
KAIG3-RFI-SW-C-2333 00 KAIG3-RFI-SW-C-2333-00
KAIG3-RFI-WG-C-2408 00 KAIG3-RFI-WG-C-2408-00
KAIG3-RFI-WG-S-5911 00 KAIG3-RFI-WG-S-5911-00
KAIG3-RFI-WG-C-2406 00 KAIG3-RFI-WG-C-2406-00
KAIG3-RFI-WG-C-2405 00 KAIG3-RFI-WG-C-2405-00
KAIG3-RFI-ZG-S-5910 00 KAIG3-RFI-ZG-S-5910-00
KAIG3-RFI-SG-S-5909 00 KAIG3-RFI-SG-S-5909-00
KAIG3-RFI-SW-C-2411 00 KAIG3-RFI-SW-C-2411-00
KAIG3-RFI-SW-C-2400 00 KAIG3-RFI-SW-C-2400-00
KAIG3-RFI-SG-C-2404 00 KAIG3-RFI-SG-C-2404-00
KAIG3-RFI-ZG-C-2403 00 KAIG3-RFI-ZG-C-2403-00
KAIG3-RFI-DG-C-2402 00 KAIG3-RFI-DG-C-2402-00
KAIG3-RFI-DG-C-2401 00 KAIG3-RFI-DG-C-2401-00
KAIG3-RFI-DG-LS-0832 00 KAIG3-RFI-DG-LS-0832-00
KAIG3-RFI-DG-A-0709 00 KAIG3-RFI-DG-A-0709-00
KAIG3-RFI-SW-C-2399 00 KAIG3-RFI-SW-C-2399-00
KAIG3-RFI-DG-A-0708 00 KAIG3-RFI-DG-A-0708-00
KAIG3-RFI-SW-C-2398 00 KAIG3-RFI-SW-C-2398-00
KAIG3-RFI-ZG-A-0707 00 KAIG3-RFI-ZG-A-0707-00
KAIG3-RFI-ZG-A-0706 00 KAIG3-RFI-ZG-A-0706-00
KAIG3-RFI-ZG-A-0705 00 KAIG3-RFI-ZG-A-0705-00
KAIG3-RFI-SW-C-2396 00 KAIG3-RFI-SW-C-2396-00
KAIG3-RFI-SW-C-2395 00 KAIG3-RFI-SW-C-2395-00
KAIG3-RFI-SW-C-2394 00 KAIG3-RFI-SW-C-2394-00
KAIG3-RFI-SW-C-2393 00 KAIG3-RFI-SW-C-2393-00
KAIG3-RFI-SW-C-2392 00 KAIG3-RFI-SW-C-2392-00
KAIG3-RFI-SW-C-2391 00 KAIG3-RFI-SW-C-2391-00
KAIG3-RFI-CO-C-2407 00 KAIG3-RFI-CO-C-2407-00
KAIG3-RFI-SW-C-2390 00 KAIG3-RFI-SW-C-2390-00
KAIG3-RFI-CO-SU-2057 00 KAIG3-RFI-CO-SU-2057-00
KAIG3-RFI-SW-C-2389 00 KAIG3-RFI-SW-C-2389-00
KAIG3-RFI-CO-S-5915 00 KAIG3-RFI-CO-S-5915-00
KAIG3-RFI-SW-C-1938 01 KAIG3-RFI-SW-C-1938-01
KAIG3-RFI-CO-S-5914 00 KAIG3-RFI-CO-S-5914-00
KAIG3-RFI-CO-S-5913 00 KAIG3-RFI-CO-S-5913-00
KAIG3-RFI-CO-S-5912 00 KAIG3-RFI-CO-S-5912-00
KAIG3-RFI-CO-S-5908 00 KAIG3-RFI-CO-S-5908-00
KAIG3-RFI-CO-S-5907 00 KAIG3-RFI-CO-S-5907-00
KAIG3-RFI-CO-S-5906 00 KAIG3-RFI-CO-S-5906-00
KAIG3-RFI-SW-C-2340 00 KAIG3-RFI-SW-C-2340-00
KAIG3-RFI-WG-S-5905 00 KAIG3-RFI-WG-S-5905-00
KAIG3-RFI-WG-S-5904 00 KAIG3-RFI-WG-S-5904-00
KAIG3-RFI-WG-S-5903 00 KAIG3-RFI-WG-S-5903-00
KAIG3-RFI-WG-S-5902 00 KAIG3-RFI-WG-S-5902-00
KAIG3-RFI-WG-S-5901 00 KAIG3-RFI-WG-S-5901-00
KAIG3-RFI-WG-S-5900 00 KAIG3-RFI-WG-S-5900-00
KAIG3-RFI-WG-S-5899 00 KAIG3-RFI-WG-S-5899-00
KAIG3-RFI-WG-C-2370 00 KAIG3-RFI-WG-C-2370-00
KAIG3-RFI-WG-C-2369 00 KAIG3-RFI-WG-C-2369-00
KAIG3-RFI-WG-C-2368 00 KAIG3-RFI-WG-C-2368-00
KAIG3-RFI-WG-C-2367 00 KAIG3-RFI-WG-C-2367-00
KAIG3-RFI-WG-C-2366 00 KAIG3-RFI-WG-C-2366-00
KAIG3-RFI-WG-C-2365 00 KAIG3-RFI-WG-C-2365-00
KAIG3-RFI-AG-S-5888 00 KAIG3-RFI-AG-S-5888-00
KAIG3-RFI-WG-C-2364 00 KAIG3-RFI-WG-C-2364-00
KAIG3-RFI-ZG-C-2363 00 KAIG3-RFI-ZG-C-2363-00
KAIG3-RFI-SG-LS-0831 00 KAIG3-RFI-SG-LS-0831-00
KAIG3-RFI-WG-LS-0830 00 KAIG3-RFI-WG-LS-0830-00
KAIG3-RFI-WG-LS-0829 00 KAIG3-RFI-WG-LS-0829-00
KAIG3-RFI-WG-LS-0828 00 KAIG3-RFI-WG-LS-0828-00
KAIG3-RFI-SG-C-2362 00 KAIG3-RFI-SG-C-2362-00
KAIG3-RFI-WG-LS-0827 00 KAIG3-RFI-WG-LS-0827-00
KAIG3-RFI-WG-LS-0826 00 KAIG3-RFI-WG-LS-0826-00
KAIG3-RFI-SW-LC-0360 00 KAIG3-RFI-SW-LC-0360-00
KAIG3-RFI-MC-S-5830 01 KAIG3-RFI-MC-S-5830-01
KAIG3-RFI-CO-C-2376 00 KAIG3-RFI-CO-C-2376-00
KAIG3-RFI-CO-C-2334 00 KAIG3-RFI-CO-C-2334-00
KAIG3-RFI-CO-SU-2056 00 KAIG3-RFI-CO-SU-2056-00
KAIG3-RFI-CO-SU-2055 00 KAIG3-RFI-CO-SU-2055-00
KAIG3-RFI-CO-SU-2054 00 KAIG3-RFI-CO-SU-2054-00
KAIG3-RFI-CO-SU-2053 00 KAIG3-RFI-CO-SU-2053-00
KAIG3-RFI-CO-SU-2051 00 KAIG3-RFI-CO-SU-2051-00
KAIG3-RFI-CO-S-5898 00 KAIG3-RFI-CO-S-5898-00
KAIG3-RFI-CO-S-5897 00 KAIG3-RFI-CO-S-5897-00
KAIG3-RFI-CO-S-5896 00 KAIG3-RFI-CO-S-5896-00
KAIG3-RFI-CO-S-5895 00 KAIG3-RFI-CO-S-5895-00
KAIG3-RFI-CO-S-5894 00 KAIG3-RFI-CO-S-5894-00
KAIG3-RFI-CO-S-5893 00 KAIG3-RFI-CO-S-5893-00
KAIG3-RFI-CO-S-5892 00 KAIG3-RFI-CO-S-5892-00
KAIG3-RFI-CO-S-5891 00 KAIG3-RFI-CO-S-5891-00
KAIG3-RFI-CO-S-5852 00 KAIG3-RFI-CO-S-5852-00
KAIG3-RFI-CO-S-5827 00 KAIG3-RFI-CO-S-5827-00
KAIG3-RFI-CO-S-5889 00 KAIG3-RFI-CO-S-5889-00
KAIG3-RFI-CO-S-5826 00 KAIG3-RFI-CO-S-5826-00
KAIG3-RFI-SW-LS-0835 00 KAIG3-RFI-SW-LS-0835-00
KAIG3-RFI-CO-S-5875 00 KAIG3-RFI-CO-S-5875-00
KAIG3-RFI-SW-LS-0834 00 KAIG3-RFI-SW-LS-0834-00
KAIG3-RFI-SW-C-2388 00 KAIG3-RFI-SW-C-2388-00
KAIG3-RFI-SW-C-2387 00 KAIG3-RFI-SW-C-2387-00
KAIG3-RFI-SW-C-2386 00 KAIG3-RFI-SW-C-2386-00
KAIG3-RFI-SW-C-2385 00 KAIG3-RFI-SW-C-2385-00
KAIG3-RFI-SW-C-2375 00 KAIG3-RFI-SW-C-2375-00
KAIG3-RFI-SW-C-2374 00 KAIG3-RFI-SW-C-2374-00
KAIG3-RFI-SW-C-2373 00 KAIG3-RFI-SW-C-2373-00
KAIG3-RFI-SW-C-2372 00 KAIG3-RFI-SW-C-2372-00
KAIG3-RFI-SW-C-2371 00 KAIG3-RFI-SW-C-2371-00
KAIG3-RFI-SW-C-2360 00 KAIG3-RFI-SW-C-2360-00
KAIG3-RFI-SW-C-2359 00 KAIG3-RFI-SW-C-2359-00
KAIG3-RFI-SW-C-2358 00 KAIG3-RFI-SW-C-2358-00
KAIG3-RFI-SW-C-2357 00 KAIG3-RFI-SW-C-2357-00
KAIG3-RFI-SW-C-2356 00 KAIG3-RFI-SW-C-2356-00
KAIG3-RFI-SW-C-2355 00 KAIG3-RFI-SW-C-2355-00
KAIG3-RFI-PA-C-2354 00 KAIG3-RFI-PA-C-2354-00
KAIG3-RFI-PA-C-2353 00 KAIG3-RFI-PA-C-2353-00
KAIG3-RFI-PA-C-2352 00 KAIG3-RFI-PA-C-2352-00
KAIG3-RFI-PA-C-2351 00 KAIG3-RFI-PA-C-2351-00
KAIG3-RFI-PA-C-2342 00 KAIG3-RFI-PA-C-2342-00
KAIG3-RFI-SW-C-2327 00 KAIG3-RFI-SW-C-2327-00
KAIG3-RFI-SW-C-2326 00 KAIG3-RFI-SW-C-2326-00
KAIG3-RFI-SW-C-2325 00 KAIG3-RFI-SW-C-2325-00
KAIG3-RFI-SW-C-2324 00 KAIG3-RFI-SW-C-2324-00
KAIG3-RFI-PC-LC-0358 00 KAIG3-RFI-PC-LC-0358-00
KAIG3-RFI-PC-LC-0357 00 KAIG3-RFI-PC-LC-0357-00
KAIG3-RFI-PC-LC-0356 00 KAIG3-RFI-PC-LC-0356-00
KAIG3-RFI-PC-E-0340 00 KAIG3-RFI-PC-E-0340-00
KAIG3-RFI-PC-LC-0359 00 KAIG3-RFI-PC-LC-0359-00
KAIG3-RFI-MC-S-5861 00 KAIG3-RFI-MC-S-5861-00
KAIG3-RFI-MC-S-5860 00 KAIG3-RFI-MC-S-5860-00
KAIG3-RFI-MC-S-5859 00 KAIG3-RFI-MC-S-5859-00
KAIG3-RFI-WG-C-2350 00 KAIG3-RFI-WG-C-2350-00
KAIG3-RFI-TG-SU-2052 00 KAIG3-RFI-TG-SU-2052-00
KAIG3-RFI-WG-LS-0822 00 KAIG3-RFI-WG-LS-0822-00
KAIG3-RFI-WG-C-2349 00 KAIG3-RFI-WG-C-2349-00
KAIG3-RFI-WG-C-2348 00 KAIG3-RFI-WG-C-2348-00
KAIG3-RFI-SG-C-2347 00 KAIG3-RFI-SG-C-2347-00
KAIG3-RFI-PG-C-2346 00 KAIG3-RFI-PG-C-2346-00
KAIG3-RFI-WG-C-2323 00 KAIG3-RFI-WG-C-2323-00
KAIG3-RFI-SG-S-5887 00 KAIG3-RFI-SG-S-5887-00
KAIG3-RFI-ZG-SU-2050 00 KAIG3-RFI-ZG-SU-2050-00
KAIG3-RFI-ZG-S-5886 00 KAIG3-RFI-ZG-S-5886-00
KAIG3-RFI-ZG-S-5885 00 KAIG3-RFI-ZG-S-5885-00
KAIG3-RFI-ZG-SU-2049 00 KAIG3-RFI-ZG-SU-2049-00
KAIG3-RFI-ZG-S-5883 00 KAIG3-RFI-ZG-S-5883-00
KAIG3-RFI-SW-LS-0825 00 KAIG3-RFI-SW-LS-0825-00
KAIG3-RFI-SW-LS-0824 00 KAIG3-RFI-SW-LS-0824-00
KAIG3-RFI-SW-LS-0256 03 KAIG3-RFI-SW-LS-0256-03
KAIG3-RFI-SW-C-2351 00 KAIG3-RFI-SW-C-2351-00
KAIG3-RFI-SW-C-2345 00 KAIG3-RFI-SW-C-2345-00
KAIG3-RFI-SW-C-2344 00 KAIG3-RFI-SW-C-2344-00
KAIG3-RFI-SW-C-2343 00 KAIG3-RFI-SW-C-2343-00
KAIG3-RFI-SW-C-2339 00 KAIG3-RFI-SW-C-2339-00
KAIG3-RFI-SW-C-2338 00 KAIG3-RFI-SW-C-2338-00
KAIG3-RFI-SW-C-2337 00 KAIG3-RFI-SW-C-2337-00
KAIG3-RFI-SW-C-2336 00 KAIG3-RFI-SW-C-2336-00
KAIG3-RFI-SW-C-2335 00 KAIG3-RFI-SW-C-2335-00
KAIG3-RFI-SW-C-2286 00 KAIG3-RFI-SW-C-2286-00
KAIG3-RFI-CO-C-2361 00 KAIG3-RFI-CO-C-2361-00
KAIG3-RFI-CO-C-2341 00 KAIG3-RFI-CO-C-2341-00
KAIG3-RFI-CO-SU-2036 00 KAIG3-RFI-CO-SU-2036-00
KAIG3-RFI-CO-S-5874 00 KAIG3-RFI-CO-S-5874-00
KAIG3-RFI-CO-S-5873 00 KAIG3-RFI-CO-S-5873-00
KAIG3-RFI-CO-S-5458 01 KAIG3-RFI-CO-S-5458-01
KAIG3-RFI-DG-LC-0355 00 KAIG3-RFI-DG-LC-0355-00
KAIG3-RFI-DG-LC-0354 00 KAIG3-RFI-DG-LC-0354-00
KAIG3-RFI-CO-S-5457 01 KAIG3-RFI-CO-S-5457-01
KAIG3-RFI-DG-E-0339 00 KAIG3-RFI-DG-E-0339-00
KAIG3-RFI-CO-S-5820 01 KAIG3-RFI-CO-S-5820-01
KAIG3-RFI-CO-S-5819 01 KAIG3-RFI-CO-S-5819-01
KAIG3-RFI-CO-S-5818 01 KAIG3-RFI-CO-S-5818-01
KAIG3-RFI-SW-LS-0255 03 KAIG3-RFI-SW-LS-0255-03
KAIG3-RFI-SW-LS-0823 00 KAIG3-RFI-SW-LS-0823-00
KAIG3-RFI-SW-LS-0817 00 KAIG3-RFI-SW-LS-0817-00
KAIG3-RFI-SW-LS-0238 03 KAIG3-RFI-SW-LS-0238-03
KAIG3-RFI-SW-LS-0217 03 KAIG3-RFI-SW-LS-0217-03
KAIG3-RFI-SW-LS-0216 03 KAIG3-RFI-SW-LS-0216-03
KAIG3-RFI-SW-C-2321 00 KAIG3-RFI-SW-C-2321-00
KAIG3-RFI-SW-C-2320 00 KAIG3-RFI-SW-C-2320-00
KAIG3-RFI-SW-C-2319 00 KAIG3-RFI-SW-C-2319-00
KAIG3-RFI-SW-C-2318 00 KAIG3-RFI-SW-C-2318-00
KAIG3-RFI-SW-C-2317 00 KAIG3-RFI-SW-C-2317-00
KAIG3-RFI-SW-C-2316 00 KAIG3-RFI-SW-C-2316-00
KAIG3-RFI-SW-C-2315 00 KAIG3-RFI-SW-C-2315-00
KAIG3-RFI-SW-C-2314 00 KAIG3-RFI-SW-C-2314-00
KAIG3-RFI-SW-C-2313 00 KAIG3-RFI-SW-C-2313-00
KAIG3-RFI-SW-C-2312 00 KAIG3-RFI-SW-C-2312-00
KAIG3-RFI-SW-C-2310 00 KAIG3-RFI-SW-C-2310-00
KAIG3-RFI-SW-C-2309 00 KAIG3-RFI-SW-C-2309-00
KAIG3-RFI-SW-C-2308 00 KAIG3-RFI-SW-C-2308-00
KAIG3-RFI-SW-C-2307 00 KAIG3-RFI-SW-C-2307-00
KAIG3-RFI-SW-C-2306 00 KAIG3-RFI-SW-C-2306-00
KAIG3-RFI-SW-C-2305 00 KAIG3-RFI-SW-C-2305-00
KAIG3-RFI-SW-C-2304 00 KAIG3-RFI-SW-C-2304-00
KAIG3-RFI-SW-C-2303 00 KAIG3-RFI-SW-C-2303-00
KAIG3-RFI-SW-C-2302 00 KAIG3-RFI-SW-C-2302-00
KAIG3-RFI-SW-C-2301 00 KAIG3-RFI-SW-C-2301-00
KAIG3-RFI-SW-C-2124 00 KAIG3-RFI-SW-C-2124-00
KAIG3-RFI-SW-C-2122 00 KAIG3-RFI-SW-C-2122-00
KAIG3-RFI-SW-C-2111 01 KAIG3-RFI-SW-C-2111-01
KAIG3-RFI-SW-C-2110 01 KAIG3-RFI-SW-C-2110-01
KAIG3-RFI-SW-C-2107 01 KAIG3-RFI-SW-C-2107-01
KAIG3-RFI-SW-C-2094 01 KAIG3-RFI-SW-C-2094-01
KAIG3-RFI-SW-C-2082 01 KAIG3-RFI-SW-C-2082-01
KAIG3-RFI-PA-C-2332 00 KAIG3-RFI-PA-C-2332-00
KAIG3-RFI-PA-C-2331 00 KAIG3-RFI-PA-C-2331-00
KAIG3-RFI-PA-C-2330 00 KAIG3-RFI-PA-C-2330-00
KAIG3-RFI-PA-C-2329 00 KAIG3-RFI-PA-C-2329-00
KAIG3-RFI-PA-C-2328 00 KAIG3-RFI-PA-C-2328-00
KAIG3-RFI-ZG-C-2299 00 KAIG3-RFI-ZG-C-2299-00
KAIG3-RFI-WG-LS-0821 00 KAIG3-RFI-WG-LS-0821-00
KAIG3-RFI-WG-LS-0820 00 KAIG3-RFI-WG-LS-0820-00
KAIG3-RFI-WG-C-2322 00 KAIG3-RFI-WG-C-2322-00
KAIG3-RFI-WG-LS-0819 00 KAIG3-RFI-WG-LS-0819-00
KAIG3-RFI-WG-LS-0818 00 KAIG3-RFI-WG-LS-0818-00
KAIG3-RFI-DG-C-2300 00 KAIG3-RFI-DG-C-2300-00
KAIG3-RFI-ZG-S-5882 00 KAIG3-RFI-ZG-S-5882-00
KAIG3-RFI-WG-LS-0814 00 KAIG3-RFI-WG-LS-0814-00
KAIG3-RFI-WG-LS-0813 00 KAIG3-RFI-WG-LS-0813-00
KAIG3-RFI-TG-SS-0027 00 KAIG3-RFI-TG-SS-0027-00
KAIG3-RFI-ZG-S-5881 00 KAIG3-RFI-ZG-S-5881-00
KAIG3-RFI-AG-S-5871 00 KAIG3-RFI-AG-S-5871-00
KAIG3-RFI-WG-C-2298 00 KAIG3-RFI-WG-C-2298-00
KAIG3-RFI-WG-C-2297 00 KAIG3-RFI-WG-C-2297-00
KAIG3-RFI-WG-C-2296 00 KAIG3-RFI-WG-C-2296-00
KAIG3-RFI-WG-C-2295 00 KAIG3-RFI-WG-C-2295-00
KAIG3-RFI-WG-C-2294 00 KAIG3-RFI-WG-C-2294-00
KAIG3-RFI-WG-C-2293 00 KAIG3-RFI-WG-C-2293-00
KAIG3-RFI-WG-C-2292 00 KAIG3-RFI-WG-C-2292-00
KAIG3-RFI-WG-C-2291 00 KAIG3-RFI-WG-C-2291-00
KAIG3-RFI-WG-C-2281 00 KAIG3-RFI-WG-C-2281-00
KAIG3-RFI-WG-C-2280 00 KAIG3-RFI-WG-C-2280-00
KAIG3-RFI-WG-C-2269 00 KAIG3-RFI-WG-C-2269-00
KAIG3-RFI-CO-S-5791 01 KAIG3-RFI-CO-S-5791-01
KAIG3-RFI-CO-S-5787 01 KAIG3-RFI-CO-S-5787-01
KAIG3-RFI-CO-S-5785 01 KAIG3-RFI-CO-S-5785-01
KAIG3-RFI-CO-S-5783 01 KAIG3-RFI-CO-S-5783-01
KAIG3-RFI-CO-S-5771 01 KAIG3-RFI-CO-S-5771-01
KAIG3-RFI-CO-S-5770 01 KAIG3-RFI-CO-S-5770-01
KAIG3-RFI-CO-S-5798 01 KAIG3-RFI-CO-S-5798-01
KAIG3-RFI-WG-LC-0350 00 KAIG3-RFI-WG-LC-0350-00
KAIG3-RFI-CO-SS-0025 01 KAIG3-RFI-CO-SS-0025-01
KAIG3-RFI-WG-LC-0346 00 KAIG3-RFI-WG-LC-0346-00
KAIG3-RFI-WG-LC-0345 00 KAIG3-RFI-WG-LC-0345-00
KAIG3-RFI-MC-SU-2048 00 KAIG3-RFI-MC-SU-2048-00
KAIG3-RFI-CO-C-2022 01 KAIG3-RFI-CO-C-2022-01
KAIG3-RFI-CO-C-2311 00 KAIG3-RFI-CO-C-2311-00
KAIG3-RFI-MC-S-5884 00 KAIG3-RFI-MC-S-5884-00
KAIG3-RFI-MC-S-5880 00 KAIG3-RFI-MC-S-5880-00
KAIG3-RFI-MC-S-5879 00 KAIG3-RFI-MC-S-5879-00
KAIG3-RFI-MC-S-5878 00 KAIG3-RFI-MC-S-5878-00
KAIG3-RFI-CO-S-5877 00 KAIG3-RFI-CO-S-5877-00
KAIG3-RFI-CO-S-5876 00 KAIG3-RFI-CO-S-5876-00
KAIG3-RFI-CO-S-5872 00 KAIG3-RFI-CO-S-5872-00
KAIG3-RFI-SG-S-5870 00 KAIG3-RFI-SG-S-5870-00
KAIG3-RFI-AG-SS-0026 00 KAIG3-RFI-AG-SS-0026-00
KAIG3-RFI-SG-S-5869 00 KAIG3-RFI-SG-S-5869-00
KAIG3-RFI-WG-C-2279 00 KAIG3-RFI-WG-C-2279-00
KAIG3-RFI-SG-C-2278 00 KAIG3-RFI-SG-C-2278-00
KAIG3-RFI-PG-C-2277 00 KAIG3-RFI-PG-C-2277-00
KAIG3-RFI-ZG-S-5868 00 KAIG3-RFI-ZG-S-5868-00
KAIG3-RFI-ZG-S-5867 00 KAIG3-RFI-ZG-S-5867-00
KAIG3-RFI-WG-C-2276 00 KAIG3-RFI-WG-C-2276-00
KAIG3-RFI-WG-C-2268 00 KAIG3-RFI-WG-C-2268-00
KAIG3-RFI-SW-C-2290 00 KAIG3-RFI-SW-C-2290-00
KAIG3-RFI-SW-C-2289 00 KAIG3-RFI-SW-C-2289-00
KAIG3-RFI-SW-C-2288 00 KAIG3-RFI-SW-C-2288-00
KAIG3-RFI-SW-C-2287 00 KAIG3-RFI-SW-C-2287-00
KAIG3-RFI-SW-C-2285 00 KAIG3-RFI-SW-C-2285-00
KAIG3-RFI-SW-C-2284 00 KAIG3-RFI-SW-C-2284-00
KAIG3-RFI-SW-C-2283 00 KAIG3-RFI-SW-C-2283-00
KAIG3-RFI-SW-C-2282 00 KAIG3-RFI-SW-C-2282-00
KAIG3-RFI-SW-C-2275 00 KAIG3-RFI-SW-C-2275-00
KAIG3-RFI-MC-SU-2047 00 KAIG3-RFI-MC-SU-2047-00
KAIG3-RFI-SW-C-2274 00 KAIG3-RFI-SW-C-2274-00
KAIG3-RFI-SW-C-2273 00 KAIG3-RFI-SW-C-2273-00
KAIG3-RFI-CO-SU-2046 00 KAIG3-RFI-CO-SU-2046-00
KAIG3-RFI-SW-C-2272 00 KAIG3-RFI-SW-C-2272-00
KAIG3-RFI-CO-SU-2045 00 KAIG3-RFI-CO-SU-2045-00
KAIG3-RFI-MC-S-5866 00 KAIG3-RFI-MC-S-5866-00
KAIG3-RFI-SW-C-2271 00 KAIG3-RFI-SW-C-2271-00
KAIG3-RFI-SW-C-2270 00 KAIG3-RFI-SW-C-2270-00
KAIG3-RFI-SW-C-2097 01 KAIG3-RFI-SW-C-2097-01
KAIG3-RFI-MC-S-5865 00 KAIG3-RFI-MC-S-5865-00
KAIG3-RFI-CO-S-5864 00 KAIG3-RFI-CO-S-5864-00
KAIG3-RFI-CO-S-5773 00 KAIG3-RFI-CO-S-5773-00
KAIG3-RFI-CO-S-5863 00 KAIG3-RFI-CO-S-5863-00
KAIG3-RFI-CO-S-5862 00 KAIG3-RFI-CO-S-5862-00
KAIG3-RFI-CO-S-5858 00 KAIG3-RFI-CO-S-5858-00
KAIG3-RFI-CO-S-5857 00 KAIG3-RFI-CO-S-5857-00
KAIG3-RFI-CO-S-5856 00 KAIG3-RFI-CO-S-5856-00
KAIG3-RFI-CO-S-5854 00 KAIG3-RFI-CO-S-5854-00
KAIG3-RFI-WG-P-0180 00 KAIG3-RFI-WG-P-0180-00
KAIG3-RFI-SW-LC-0348 00 KAIG3-RFI-SW-LC-0348-00
KAIG3-RFI-WG-C-2267 00 KAIG3-RFI-WG-C-2267-00
KAIG3-RFI-WG-C-2261 00 KAIG3-RFI-WG-C-2261-00
KAIG3-RFI-WG-C-2253 00 KAIG3-RFI-WG-C-2253-00
KAIG3-RFI-WG-C-2251 00 KAIG3-RFI-WG-C-2251-00
KAIG3-RFI-WG-C-2266 00 KAIG3-RFI-WG-C-2266-00
KAIG3-RFI-WG-LS-0816 00 KAIG3-RFI-WG-LS-0816-00
KAIG3-RFI-SG-S-5847 00 KAIG3-RFI-SG-S-5847-00
KAIG3-RFI-SG-S-5855 00 KAIG3-RFI-SG-S-5855-00
KAIG3-RFI-SG-S-5854 00 KAIG3-RFI-SG-S-5854-00
KAIG3-RFI-SG-S-5846 00 KAIG3-RFI-SG-S-5846-00
KAIG3-RFI-PG-S-5845 00 KAIG3-RFI-PG-S-5845-00
KAIG3-RFI-SG-C-2252 00 KAIG3-RFI-SG-C-2252-00
KAIG3-RFI-ZG-S-5844 00 KAIG3-RFI-ZG-S-5844-00
KAIG3-RFI-ZG-C-2231 00 KAIG3-RFI-ZG-C-2231-00
KAIG3-RFI-WG-S-5842 00 KAIG3-RFI-WG-S-5842-00
KAIG3-RFI-WG-C-2236 00 KAIG3-RFI-WG-C-2236-00
KAIG3-RFI-WG-C-2235 00 KAIG3-RFI-WG-C-2235-00
KAIG3-RFI-WG-C-2234 00 KAIG3-RFI-WG-C-2234-00
KAIG3-RFI-WG-LS-0811 00 KAIG3-RFI-WG-LS-0811-00
KAIG3-RFI-WG-LS-0810 00 KAIG3-RFI-WG-LS-0810-00
KAIG3-RFI-CO-E-0338 00 KAIG3-RFI-CO-E-0338-00
KAIG3-RFI-PC-LC-0353 00 KAIG3-RFI-PC-LC-0353-00
KAIG3-RFI-SW-LC-0352 00 KAIG3-RFI-SW-LC-0352-00
KAIG3-RFI-SW-LC-0351 00 KAIG3-RFI-SW-LC-0351-00
KAIG3-RFI-CO-S-5851 00 KAIG3-RFI-CO-S-5851-00
KAIG3-RFI-CO-S-5850 00 KAIG3-RFI-CO-S-5850-00
KAIG3-RFI-SW-LS-0815 00 KAIG3-RFI-SW-LS-0815-00
KAIG3-RFI-CO-S-5849 00 KAIG3-RFI-CO-S-5849-00
KAIG3-RFI-SW-LS-0808 00 KAIG3-RFI-SW-LS-0808-00
KAIG3-RFI-SW-LS-0807 00 KAIG3-RFI-SW-LS-0807-00
KAIG3-RFI-CO-S-5848 00 KAIG3-RFI-CO-S-5848-00
KAIG3-RFI-SW-C-2265 00 KAIG3-RFI-SW-C-2265-00
KAIG3-RFI-SW-C-2263 00 KAIG3-RFI-SW-C-2263-00
KAIG3-RFI-CO-C-2264 00 KAIG3-RFI-CO-C-2264-00
KAIG3-RFI-SW-C-2260 00 KAIG3-RFI-SW-C-2260-00
KAIG3-RFI-SW-C-2259 00 KAIG3-RFI-SW-C-2259-00
KAIG3-RFI-SW-C-2258 00 KAIG3-RFI-SW-C-2258-00
KAIG3-RFI-SW-C-2257 00 KAIG3-RFI-SW-C-2257-00
KAIG3-RFI-SW-C-2256 00 KAIG3-RFI-SW-C-2256-00
KAIG3-RFI-CO-SU-2044 00 KAIG3-RFI-CO-SU-2044-00
KAIG3-RFI-SW-C-2255 00 KAIG3-RFI-SW-C-2255-00
KAIG3-RFI-SW-C-2254 00 KAIG3-RFI-SW-C-2254-00
KAIG3-RFI-SW-C-2250 00 KAIG3-RFI-SW-C-2250-00
KAIG3-RFI-SW-C-2249 00 KAIG3-RFI-SW-C-2249-00
KAIG3-RFI-CO-SU-2043 00 KAIG3-RFI-CO-SU-2043-00
KAIG3-RFI-SW-C-2248 00 KAIG3-RFI-SW-C-2248-00
KAIG3-RFI-SW-C-2247 00 KAIG3-RFI-SW-C-2247-00
KAIG3-RFI-CO-SU-2042 00 KAIG3-RFI-CO-SU-2042-00
KAIG3-RFI-CO-SU-2041 00 KAIG3-RFI-CO-SU-2041-00
KAIG3-RFI-PC-E-0337 00 KAIG3-RFI-PC-E-0337-00
KAIG3-RFI-SW-E-0325 01 KAIG3-RFI-SW-E-0325-01
KAIG3-RFI-PC-LC-0349 00 KAIG3-RFI-PC-LC-0349-00
KAIG3-RFI-ZG-LS-0812 00 KAIG3-RFI-ZG-LS-0812-00
KAIG3-RFI-WG-C-2239 00 KAIG3-RFI-WG-C-2239-00
KAIG3-RFI-WG-C-2238 00 KAIG3-RFI-WG-C-2238-00
KAIG3-RFI-WG-C-2237 00 KAIG3-RFI-WG-C-2237-00
KAIG3-RFI-WG-C-2233 00 KAIG3-RFI-WG-C-2233-00
KAIG3-RFI-WG-C-2232 00 KAIG3-RFI-WG-C-2232-00
KAIG3-RFI-ZG-A-0704 00 KAIG3-RFI-ZG-A-0704-00
KAIG3-RFI-ZG-A-0703 00 KAIG3-RFI-ZG-A-0703-00
KAIG3-RFI-DG-S-5841 00 KAIG3-RFI-DG-S-5841-00
KAIG3-RFI-PG-S-5840 00 KAIG3-RFI-PG-S-5840-00
KAIG3-RFI-SG-LS-0809 00 KAIG3-RFI-SG-LS-0809-00
KAIG3-RFI-WG-C-2230 00 KAIG3-RFI-WG-C-2230-00
KAIG3-RFI-WG-C-2229 00 KAIG3-RFI-WG-C-2229-00
KAIG3-RFI-WG-LS-0800 00 KAIG3-RFI-WG-LS-0800-00
KAIG3-RFI-WG-C-2207 00 KAIG3-RFI-WG-C-2207-00
KAIG3-RFI-PG-C-2228 00 KAIG3-RFI-PG-C-2228-00
KAIG3-RFI-DG-C-2194 00 KAIG3-RFI-DG-C-2194-00
KAIG3-RFI-SG-C-2193 00 KAIG3-RFI-SG-C-2193-00
KAIG3-RFI-SW-LS-0806 00 KAIG3-RFI-SW-LS-0806-00
KAIG3-RFI-SW-LS-0805 00 KAIG3-RFI-SW-LS-0805-00
KAIG3-RFI-SW-LS-0804 00 KAIG3-RFI-SW-LS-0804-00
KAIG3-RFI-SW-LS-0803 00 KAIG3-RFI-SW-LS-0803-00
KAIG3-RFI-SW-LS-0802 00 KAIG3-RFI-SW-LS-0802-00
KAIG3-RFI-SW-LS-0801 00 KAIG3-RFI-SW-LS-0801-00
KAIG3-RFI-SW-C-2246 00 KAIG3-RFI-SW-C-2246-00
KAIG3-RFI-SW-C-2245 00 KAIG3-RFI-SW-C-2245-00
KAIG3-RFI-SW-C-2244 00 KAIG3-RFI-SW-C-2244-00
KAIG3-RFI-SW-C-2227 00 KAIG3-RFI-SW-C-2227-00
KAIG3-RFI-SW-C-2226 00 KAIG3-RFI-SW-C-2226-00
KAIG3-RFI-SW-C-2225 00 KAIG3-RFI-SW-C-2225-00
KAIG3-RFI-SW-C-2224 00 KAIG3-RFI-SW-C-2224-00
KAIG3-RFI-SW-C-2223 00 KAIG3-RFI-SW-C-2223-00
KAIG3-RFI-SW-C-2222 00 KAIG3-RFI-SW-C-2222-00
KAIG3-RFI-SW-C-2221 00 KAIG3-RFI-SW-C-2221-00
KAIG3-RFI-SW-C-2220 00 KAIG3-RFI-SW-C-2220-00
KAIG3-RFI-SW-C-2219 00 KAIG3-RFI-SW-C-2219-00
KAIG3-RFI-SW-C-2210 00 KAIG3-RFI-SW-C-2210-00
KAIG3-RFI-SW-C-2204 00 KAIG3-RFI-SW-C-2204-00
KAIG3-RFI-CO-SU-2040 00 KAIG3-RFI-CO-SU-2040-00
KAIG3-RFI-CO-S-5839 00 KAIG3-RFI-CO-S-5839-00
KAIG3-RFI-CO-S-5837 00 KAIG3-RFI-CO-S-5837-00
KAIG3-RFI-CO-S-5838 00 KAIG3-RFI-CO-S-5838-00
KAIG3-RFI-WG-LC-0347 00 KAIG3-RFI-WG-LC-0347-00
KAIG3-RFI-SW-C-2243 00 KAIG3-RFI-SW-C-2243-00
KAIG3-RFI-SW-C-2242 00 KAIG3-RFI-SW-C-2242-00
KAIG3-RFI-SW-C-2241 00 KAIG3-RFI-SW-C-2241-00
KAIG3-RFI-SW-C-2240 00 KAIG3-RFI-SW-C-2240-00
KAIG3-RFI-SW-C-2181 00 KAIG3-RFI-SW-C-2181-00
KAIG3-RFI-SW-C-2178 00 KAIG3-RFI-SW-C-2178-00
KAIG3-RFI-SW-C-2177 00 KAIG3-RFI-SW-C-2177-00
KAIG3-RFI-WG-E-0336 00 KAIG3-RFI-WG-E-0336-00
KAIG3-RFI-ZG-C-2208 00 KAIG3-RFI-ZG-C-2208-00
KAIG3-RFI-WG-LS-0798 00 KAIG3-RFI-WG-LS-0798-00
KAIG3-RFI-WG-LS-0797 00 KAIG3-RFI-WG-LS-0797-00
KAIG3-RFI-PG-S-5835 00 KAIG3-RFI-PG-S-5835-00
KAIG3-RFI-WG-LS-0799 00 KAIG3-RFI-WG-LS-0799-00
KAIG3-RFI-SG-C-2188 00 KAIG3-RFI-SG-C-2188-00
KAIG3-RFI-PG-S-5834 00 KAIG3-RFI-PG-S-5834-00
KAIG3-RFI-PG-S-5833 00 KAIG3-RFI-PG-S-5833-00
KAIG3-RFI-SW-A-0702 00 KAIG3-RFI-SW-A-0702-00
KAIG3-RFI-CO-C-2216 00 KAIG3-RFI-CO-C-2216-00
KAIG3-RFI-CO-C-2215 00 KAIG3-RFI-CO-C-2215-00
KAIG3-RFI-MC-C-2214 00 KAIG3-RFI-MC-C-2214-00
KAIG3-RFI-CO-SU-2039 00 KAIG3-RFI-CO-SU-2039-00
KAIG3-RFI-SW-LS-0796 00 KAIG3-RFI-SW-LS-0796-00
KAIG3-RFI-SW-LS-0795 00 KAIG3-RFI-SW-LS-0795-00
KAIG3-RFI-SW-C-2218 00 KAIG3-RFI-SW-C-2218-00
KAIG3-RFI-SW-C-2217 00 KAIG3-RFI-SW-C-2217-00
KAIG3-RFI-SW-C-2213 00 KAIG3-RFI-SW-C-2213-00
KAIG3-RFI-SW-C-2212 00 KAIG3-RFI-SW-C-2212-00
KAIG3-RFI-SW-C-2211 00 KAIG3-RFI-SW-C-2211-00
KAIG3-RFI-SW-C-2209 00 KAIG3-RFI-SW-C-2209-00
KAIG3-RFI-SW-C-2205 00 KAIG3-RFI-SW-C-2205-00
KAIG3-RFI-SW-C-2202 00 KAIG3-RFI-SW-C-2202-00
KAIG3-RFI-SW-C-2201 00 KAIG3-RFI-SW-C-2201-00
KAIG3-RFI-SW-C-1789 00 KAIG3-RFI-SW-C-1789-00
KAIG3-RFI-CO-S-5836 00 KAIG3-RFI-CO-S-5836-00
KAIG3-RFI-SW-C-0472 01 KAIG3-RFI-SW-C-0472-01
KAIG3-RFI-SW-C-0457 01 KAIG3-RFI-SW-C-0457-01
KAIG3-RFI-CO-S-5832 00 KAIG3-RFI-CO-S-5832-00
KAIG3-RFI-CO-S-5831 00 KAIG3-RFI-CO-S-5831-00
KAIG3-RFI-MC-S-5830 00 KAIG3-RFI-MC-S-5830-00
KAIG3-RFI-CO-S-5829 00 KAIG3-RFI-CO-S-5829-00
KAIG3-RFI-CO-S-5757 01 KAIG3-RFI-CO-S-5757-01
KAIG3-RFI-CO-S-5725 01 KAIG3-RFI-CO-S-5725-01
KAIG3-RFI-CO-S-5718 01 KAIG3-RFI-CO-S-5718-01
KAIG3-RFI-CO-S-5713 01 KAIG3-RFI-CO-S-5713-01
KAIG3-RFI-CO-S-5715 01 KAIG3-RFI-CO-S-5715-01
KAIG3-RFI-MC-SU-2038 00 KAIG3-RFI-MC-SU-2038-00
KAIG3-RFI-CO-S-5825 00 KAIG3-RFI-CO-S-5825-00
KAIG3-RFI-CO-C-2172 00 KAIG3-RFI-CO-C-2172-00
KAIG3-RFI-CO-C-2171 00 KAIG3-RFI-CO-C-2171-00
KAIG3-RFI-CO-C-2170 00 KAIG3-RFI-CO-C-2170-00
KAIG3-RFI-WG-C-2200 00 KAIG3-RFI-WG-C-2200-00
KAIG3-RFI-WG-C-2192 00 KAIG3-RFI-WG-C-2192-00
KAIG3-RFI-WG-C-2191 00 KAIG3-RFI-WG-C-2191-00
KAIG3-RFI-WG-C-2190 00 KAIG3-RFI-WG-C-2190-00
KAIG3-RFI-WG-C-2189 00 KAIG3-RFI-WG-C-2189-00
KAIG3-RFI-WG-C-2187 00 KAIG3-RFI-WG-C-2187-00
KAIG3-RFI-WG-C-2186 00 KAIG3-RFI-WG-C-2186-00
KAIG3-RFI-WG-C-2185 00 KAIG3-RFI-WG-C-2185-00
KAIG3-RFI-WG-C-2184 00 KAIG3-RFI-WG-C-2184-00
KAIG3-RFI-SG-C-2183 00 KAIG3-RFI-SG-C-2183-00
KAIG3-RFI-SG-S-5828 00 KAIG3-RFI-SG-S-5828-00
KAIG3-RFI-SG-C-2182 00 KAIG3-RFI-SG-C-2182-00
KAIG3-RFI-SG-A-0701 00 KAIG3-RFI-SG-A-0701-00
KAIG3-RFI-ZG-C-2169 00 KAIG3-RFI-ZG-C-2169-00
KAIG3-RFI-ZG-C-2168 00 KAIG3-RFI-ZG-C-2168-00
KAIG3-RFI-ZG-S-5823 00 KAIG3-RFI-ZG-S-5823-00
KAIG3-RFI-PG-S-5822 00 KAIG3-RFI-PG-S-5822-00
KAIG3-RFI-PG-S-5821 00 KAIG3-RFI-PG-S-5821-00
KAIG3-RFI-SW-LS-0794 00 KAIG3-RFI-SW-LS-0794-00
KAIG3-RFI-SW-C-2199 00 KAIG3-RFI-SW-C-2199-00
KAIG3-RFI-SW-C-2198 00 KAIG3-RFI-SW-C-2198-00
KAIG3-RFI-SW-C-2197 00 KAIG3-RFI-SW-C-2197-00
KAIG3-RFI-SW-C-2196 00 KAIG3-RFI-SW-C-2196-00
KAIG3-RFI-SW-C-2195 00 KAIG3-RFI-SW-C-2195-00
KAIG3-RFI-SW-C-2167 00 KAIG3-RFI-SW-C-2167-00
KAIG3-RFI-SW-C-2166 00 KAIG3-RFI-SW-C-2166-00
KAIG3-RFI-SW-C-2165 00 KAIG3-RFI-SW-C-2165-00
KAIG3-RFI-SW-C-2164 00 KAIG3-RFI-SW-C-2164-00
KAIG3-RFI-SW-C-2163 00 KAIG3-RFI-SW-C-2163-00
KAIG3-RFI-SW-C-2162 00 KAIG3-RFI-SW-C-2162-00
KAIG3-RFI-SW-C-2161 00 KAIG3-RFI-SW-C-2161-00
KAIG3-RFI-SW-C-0883 02 KAIG3-RFI-SW-C-0883-02
KAIG3-RFI-SW-C-2180 00 KAIG3-RFI-SW-C-2180-00
KAIG3-RFI-SW-C-2179 00 KAIG3-RFI-SW-C-2179-00
KAIG3-RFI-SW-C-2176 00 KAIG3-RFI-SW-C-2176-00
KAIG3-RFI-SW-C-2175 00 KAIG3-RFI-SW-C-2175-00
KAIG3-RFI-SW-C-2174 00 KAIG3-RFI-SW-C-2174-00
KAIG3-RFI-SW-C-2173 00 KAIG3-RFI-SW-C-2173-00
KAIG3-RFI-WG-P-0172 00 KAIG3-RFI-WG-P-0172-00
KAIG3-RFI-SW-LS-0793 00 KAIG3-RFI-SW-LS-0793-00
KAIG3-RFI-SW-LS-0790 00 KAIG3-RFI-SW-LS-0790-00
KAIG3-RFI-SW-C-2160 00 KAIG3-RFI-SW-C-2160-00
KAIG3-RFI-SW-C-2152 00 KAIG3-RFI-SW-C-2152-00
KAIG3-RFI-SW-C-2151 00 KAIG3-RFI-SW-C-2151-00
KAIG3-RFI-SW-C-2150 00 KAIG3-RFI-SW-C-2150-00
KAIG3-RFI-SW-C-2149 00 KAIG3-RFI-SW-C-2149-00
KAIG3-RFI-SW-C-2148 00 KAIG3-RFI-SW-C-2148-00
KAIG3-RFI-SW-C-2147 00 KAIG3-RFI-SW-C-2147-00
KAIG3-RFI-SW-C-2146 00 KAIG3-RFI-SW-C-2146-00
KAIG3-RFI-SW-C-2145 00 KAIG3-RFI-SW-C-2145-00
KAIG3-RFI-SW-C-2144 00 KAIG3-RFI-SW-C-2144-00
KAIG3-RFI-SW-C-2143 00 KAIG3-RFI-SW-C-2143-00
KAIG3-RFI-SW-C-2140 00 KAIG3-RFI-SW-C-2140-00
KAIG3-RFI-SW-C-2139 00 KAIG3-RFI-SW-C-2139-00
KAIG3-RFI-SW-C-2138 00 KAIG3-RFI-SW-C-2138-00
KAIG3-RFI-SW-C-2137 00 KAIG3-RFI-SW-C-2137-00
KAIG3-RFI-SW-C-2136 00 KAIG3-RFI-SW-C-2136-00
KAIG3-RFI-SW-C-2135 00 KAIG3-RFI-SW-C-2135-00
KAIG3-RFI-SW-C-2134 00 KAIG3-RFI-SW-C-2134-00
KAIG3-RFI-SW-C-2133 00 KAIG3-RFI-SW-C-2133-00
KAIG3-RFI-SW-C-2132 00 KAIG3-RFI-SW-C-2132-00
KAIG3-RFI-SW-C-1630 01 KAIG3-RFI-SW-C-1630-01
KAIG3-RFI-SW-E-0335 00 KAIG3-RFI-SW-E-0335-00
KAIG3-RFI-WG-C-2159 00 KAIG3-RFI-WG-C-2159-00
KAIG3-RFI-WG-C-2158 00 KAIG3-RFI-WG-C-2158-00
KAIG3-RFI-WG-S-5824 00 KAIG3-RFI-WG-S-5824-00
KAIG3-RFI-WG-C-2157 00 KAIG3-RFI-WG-C-2157-00
KAIG3-RFI-WG-C-2156 00 KAIG3-RFI-WG-C-2156-00
KAIG3-RFI-WG-C-2155 00 KAIG3-RFI-WG-C-2155-00
KAIG3-RFI-WG-C-2154 00 KAIG3-RFI-WG-C-2154-00
KAIG3-RFI-DG-C-2153 00 KAIG3-RFI-DG-C-2153-00
KAIG3-RFI-WG-LS-0792 00 KAIG3-RFI-WG-LS-0792-00
KAIG3-RFI-WG-LS-0791 00 KAIG3-RFI-WG-LS-0791-00
KAIG3-RFI-WG-C-2130 00 KAIG3-RFI-WG-C-2130-00
KAIG3-RFI-WG-C-2129 00 KAIG3-RFI-WG-C-2129-00
KAIG3-RFI-WG-C-2128 00 KAIG3-RFI-WG-C-2128-00
KAIG3-RFI-WG-C-2119 00 KAIG3-RFI-WG-C-2119-00
KAIG3-RFI-MB-A-0700 00 KAIG3-RFI-MB-A-0700-00
KAIG3-RFI-TB-A-0699 00 KAIG3-RFI-TB-A-0699-00
KAIG3-RFI-WG-E-0334 00 KAIG3-RFI-WG-E-0334-00
KAIG3-RFI-CO-SU-2016 01 KAIG3-RFI-CO-SU-2016-01
KAIG3-RFI-CO-SU-2035 00 KAIG3-RFI-CO-SU-2035-00
KAIG3-RFI-CO-SU-2034 00 KAIG3-RFI-CO-SU-2034-00
KAIG3-RFI-CO-C-2142 00 KAIG3-RFI-CO-C-2142-00
KAIG3-RFI-CO-C-2141 00 KAIG3-RFI-CO-C-2141-00
KAIG3-RFI-CO-S-5816 00 KAIG3-RFI-CO-S-5816-00
KAIG3-RFI-CO-S-5808 00 KAIG3-RFI-CO-S-5808-00
KAIG3-RFI-CO-S-5820 00 KAIG3-RFI-CO-S-5820-00
KAIG3-RFI-CO-S-5819 00 KAIG3-RFI-CO-S-5819-00
KAIG3-RFI-CO-S-5818 00 KAIG3-RFI-CO-S-5818-00
KAIG3-RFI-CO-S-5817 00 KAIG3-RFI-CO-S-5817-00
KAIG3-RFI-CO-S-5717 00 KAIG3-RFI-CO-S-5717-00
KAIG3-RFI-WG-C-2127 00 KAIG3-RFI-WG-C-2127-00
KAIG3-RFI-WG-C-2126 00 KAIG3-RFI-WG-C-2126-00
KAIG3-RFI-WG-C-2125 00 KAIG3-RFI-WG-C-2125-00
KAIG3-RFI-WG-C-2120 00 KAIG3-RFI-WG-C-2120-00
KAIG3-RFI-MB-A-0698 00 KAIG3-RFI-MB-A-0698-00
KAIG3-RFI-ZG-A-0697 00 KAIG3-RFI-ZG-A-0697-00
KAIG3-RFI-ZG-C-2118 00 KAIG3-RFI-ZG-C-2118-00
KAIG3-RFI-ZG-S-5812 00 KAIG3-RFI-ZG-S-5812-00
KAIG3-RFI-SG-C-2113 00 KAIG3-RFI-SG-C-2113-00
KAIG3-RFI-PG-S-5811 00 KAIG3-RFI-PG-S-5811-00
KAIG3-RFI-WG-LS-0789 00 KAIG3-RFI-WG-LS-0789-00
KAIG3-RFI-WG-LS-0788 00 KAIG3-RFI-WG-LS-0788-00
KAIG3-RFI-SW-LS-0787 00 KAIG3-RFI-SW-LS-0787-00
KAIG3-RFI-SW-LS-0786 00 KAIG3-RFI-SW-LS-0786-00
KAIG3-RFI-SW-C-2131 00 KAIG3-RFI-SW-C-2131-00
KAIG3-RFI-SW-C-2123 00 KAIG3-RFI-SW-C-2123-00
KAIG3-RFI-SW-C-2121 00 KAIG3-RFI-SW-C-2121-00
KAIG3-RFI-CO-SU-2033 00 KAIG3-RFI-CO-SU-2033-00
KAIG3-RFI-CO-S-5815 00 KAIG3-RFI-CO-S-5815-00
KAIG3-RFI-CO-S-5814 00 KAIG3-RFI-CO-S-5814-00
KAIG3-RFI-CO-S-5813 00 KAIG3-RFI-CO-S-5813-00
KAIG3-RFI-CO-S-5762 00 KAIG3-RFI-CO-S-5762-00
KAIG3-RFI-ZG-LS-0785 00 KAIG3-RFI-ZG-LS-0785-00
KAIG3-RFI-WG-C-2117 00 KAIG3-RFI-WG-C-2117-00
KAIG3-RFI-WG-C-2116 00 KAIG3-RFI-WG-C-2116-00
KAIG3-RFI-WG-C-2115 00 KAIG3-RFI-WG-C-2115-00
KAIG3-RFI-WG-C-1988 01 KAIG3-RFI-WG-C-1988-01
KAIG3-RFI-WG-C-1968 01 KAIG3-RFI-WG-C-1968-01
KAIG3-RFI-SG-C-2114 00 KAIG3-RFI-SG-C-2114-00
KAIG3-RFI-WG-LS-0784 00 KAIG3-RFI-WG-LS-0784-00
KAIG3-RFI-PG-LS-0783 00 KAIG3-RFI-PG-LS-0783-00
KAIG3-RFI-SG-S-5799 00 KAIG3-RFI-SG-S-5799-00
KAIG3-RFI-MB-A-0696 00 KAIG3-RFI-MB-A-0696-00
KAIG3-RFI-MB-S-5795 00 KAIG3-RFI-MB-S-5795-00
KAIG3-RFI-WG-C-2093 00 KAIG3-RFI-WG-C-2093-00
KAIG3-RFI-WG-C-2092 00 KAIG3-RFI-WG-C-2092-00
KAIG3-RFI-MC-S-5810 00 KAIG3-RFI-MC-S-5810-00
KAIG3-RFI-MC-S-5809 00 KAIG3-RFI-MC-S-5809-00
KAIG3-RFI-CO-S-5807 00 KAIG3-RFI-CO-S-5807-00
KAIG3-RFI-CO-S-5806 00 KAIG3-RFI-CO-S-5806-00
KAIG3-RFI-MC-S-5805 00 KAIG3-RFI-MC-S-5805-00
KAIG3-RFI-CO-S-5804 00 KAIG3-RFI-CO-S-5804-00
KAIG3-RFI-CO-S-5803 00 KAIG3-RFI-CO-S-5803-00
KAIG3-RFI-MC-S-5802 00 KAIG3-RFI-MC-S-5802-00
KAIG3-RFI-MC-S-5801 00 KAIG3-RFI-MC-S-5801-00
KAIG3-RFI-MC-S-5800 00 KAIG3-RFI-MC-S-5800-00
KAIG3-RFI-CO-S-5798 00 KAIG3-RFI-CO-S-5798-00
KAIG3-RFI-CO-S-5797 00 KAIG3-RFI-CO-S-5797-00
KAIG3-RFI-WG-E-0333 00 KAIG3-RFI-WG-E-0333-00
KAIG3-RFI-CO-S-5796 00 KAIG3-RFI-CO-S-5796-00
KAIG3-RFI-MC-S-5610 02 KAIG3-RFI-MC-S-5610-02
KAIG3-RFI-MC-S-5609 02 KAIG3-RFI-MC-S-5609-02
KAIG3-RFI-MC-S-5654 01 KAIG3-RFI-MC-S-5654-01
KAIG3-RFI-PC-LC-0344 00 KAIG3-RFI-PC-LC-0344-00
KAIG3-RFI-PC-LC-0343 00 KAIG3-RFI-PC-LC-0343-00
KAIG3-RFI-MC-S-5653 01 KAIG3-RFI-MC-S-5653-01
KAIG3-RFI-PC-E-0332 00 KAIG3-RFI-PC-E-0332-00
KAIG3-RFI-CO-E-0331 00 KAIG3-RFI-CO-E-0331-00
KAIG3-RFI-MC-SU-2032 00 KAIG3-RFI-MC-SU-2032-00
KAIG3-RFI-CO-SU-2031 00 KAIG3-RFI-CO-SU-2031-00
KAIG3-RFI-CO-SU-2030 00 KAIG3-RFI-CO-SU-2030-00
KAIG3-RFI-MC-SU-2029 00 KAIG3-RFI-MC-SU-2029-00
KAIG3-RFI-CO-SU-2028 00 KAIG3-RFI-CO-SU-2028-00
KAIG3-RFI-CO-SU-2027 00 KAIG3-RFI-CO-SU-2027-00
KAIG3-RFI-CO-SS-0025 00 KAIG3-RFI-CO-SS-0025-00
KAIG3-RFI-CO-SS-0024 00 KAIG3-RFI-CO-SS-0024-00
KAIG3-RFI-SW-LS-0782 00 KAIG3-RFI-SW-LS-0782-00
KAIG3-RFI-SW-LS-0781 00 KAIG3-RFI-SW-LS-0781-00
KAIG3-RFI-SW-C-2112 00 KAIG3-RFI-SW-C-2112-00
KAIG3-RFI-SW-C-2111 00 KAIG3-RFI-SW-C-2111-00
KAIG3-RFI-SW-C-2110 00 KAIG3-RFI-SW-C-2110-00
KAIG3-RFI-SW-C-2109 00 KAIG3-RFI-SW-C-2109-00
KAIG3-RFI-SW-C-2108 00 KAIG3-RFI-SW-C-2108-00
KAIG3-RFI-SW-C-2107 00 KAIG3-RFI-SW-C-2107-00
KAIG3-RFI-SW-C-2106 00 KAIG3-RFI-SW-C-2106-00
KAIG3-RFI-SW-C-2104 00 KAIG3-RFI-SW-C-2104-00
KAIG3-RFI-SW-C-2094 00 KAIG3-RFI-SW-C-2094-00
KAIG3-RFI-AG-S-5749 01 KAIG3-RFI-AG-S-5749-01
KAIG3-RFI-AG-S-5794 00 KAIG3-RFI-AG-S-5794-00
KAIG3-RFI-AG-SU-2026 00 KAIG3-RFI-AG-SU-2026-00
KAIG3-RFI-ZG-SU-2025 00 KAIG3-RFI-ZG-SU-2025-00
KAIG3-RFI-ZG-S-5793 00 KAIG3-RFI-ZG-S-5793-00
KAIG3-RFI-WG-C-2091 00 KAIG3-RFI-WG-C-2091-00
KAIG3-RFI-SG-C-2090 00 KAIG3-RFI-SG-C-2090-00
KAIG3-RFI-SG-C-2089 00 KAIG3-RFI-SG-C-2089-00
KAIG3-RFI-SG-C-2088 00 KAIG3-RFI-SG-C-2088-00
KAIG3-RFI-WG-LS-0780 00 KAIG3-RFI-WG-LS-0780-00
KAIG3-RFI-PG-S-5792 00 KAIG3-RFI-PG-S-5792-00
KAIG3-RFI-PG-C-2087 00 KAIG3-RFI-PG-C-2087-00
KAIG3-RFI-DG-C-2078 00 KAIG3-RFI-DG-C-2078-00
KAIG3-RFI-DG-C-2077 00 KAIG3-RFI-DG-C-2077-00
KAIG3-RFI-WG-LS-0779 00 KAIG3-RFI-WG-LS-0779-00
KAIG3-RFI-WG-C-2086 00 KAIG3-RFI-WG-C-2086-00
KAIG3-RFI-MB-E-0327 00 KAIG3-RFI-MB-E-0327-00
KAIG3-RFI-SW-C-2103 00 KAIG3-RFI-SW-C-2103-00
KAIG3-RFI-SW-C-2102 00 KAIG3-RFI-SW-C-2102-00
KAIG3-RFI-SW-C-2097 00 KAIG3-RFI-SW-C-2097-00
KAIG3-RFI-SW-C-2096 00 KAIG3-RFI-SW-C-2096-00
KAIG3-RFI-SW-C-2095 00 KAIG3-RFI-SW-C-2095-00
KAIG3-RFI-SW-C-2085 00 KAIG3-RFI-SW-C-2085-00
KAIG3-RFI-SW-C-2084 00 KAIG3-RFI-SW-C-2084-00
KAIG3-RFI-CO-S-5791 00 KAIG3-RFI-CO-S-5791-00
KAIG3-RFI-SW-C-2083 00 KAIG3-RFI-SW-C-2083-00
KAIG3-RFI-CO-S-5790 00 KAIG3-RFI-CO-S-5790-00
KAIG3-RFI-SW-C-2082 00 KAIG3-RFI-SW-C-2082-00
KAIG3-RFI-CO-S-5789 00 KAIG3-RFI-CO-S-5789-00
KAIG3-RFI-SW-C-2081 00 KAIG3-RFI-SW-C-2081-00
KAIG3-RFI-SW-C-2080 00 KAIG3-RFI-SW-C-2080-00
KAIG3-RFI-CO-S-5788 00 KAIG3-RFI-CO-S-5788-00
KAIG3-RFI-SW-C-2079 00 KAIG3-RFI-SW-C-2079-00
KAIG3-RFI-CO-S-5787 00 KAIG3-RFI-CO-S-5787-00
KAIG3-RFI-CO-S-5786 00 KAIG3-RFI-CO-S-5786-00
KAIG3-RFI-CO-S-5761 00 KAIG3-RFI-CO-S-5761-00
KAIG3-RFI-SW-C-1358 01 KAIG3-RFI-SW-C-1358-01
KAIG3-RFI-CO-C-2098 00 KAIG3-RFI-CO-C-2098-00
KAIG3-RFI-CO-SU-2024 00 KAIG3-RFI-CO-SU-2024-00
KAIG3-RFI-CO-SU-2023 00 KAIG3-RFI-CO-SU-2023-00
KAIG3-RFI-CO-SU-2018 00 KAIG3-RFI-CO-SU-2018-00
KAIG3-RFI-WG-P-0171 00 KAIG3-RFI-WG-P-0171-00
KAIG3-RFI-SW-C-2101 00 KAIG3-RFI-SW-C-2101-00
KAIG3-RFI-SW-C-2100 00 KAIG3-RFI-SW-C-2100-00
KAIG3-RFI-SW-C-2099 00 KAIG3-RFI-SW-C-2099-00
KAIG3-RFI-PC-E-0330 00 KAIG3-RFI-PC-E-0330-00
KAIG3-RFI-PC-LC-0342 00 KAIG3-RFI-PC-LC-0342-00
KAIG3-RFI-PC-LC-0341 00 KAIG3-RFI-PC-LC-0341-00
KAIG3-RFI-PC-LC-0340 00 KAIG3-RFI-PC-LC-0340-00
KAIG3-RFI-SW-LS-0778 00 KAIG3-RFI-SW-LS-0778-00
KAIG3-RFI-SW-LS-0777 00 KAIG3-RFI-SW-LS-0777-00
KAIG3-RFI-PC-LC-0339 00 KAIG3-RFI-PC-LC-0339-00
KAIG3-RFI-SW-LS-0776 00 KAIG3-RFI-SW-LS-0776-00
KAIG3-RFI-SW-C-2074 00 KAIG3-RFI-SW-C-2074-00
KAIG3-RFI-SW-C-2073 00 KAIG3-RFI-SW-C-2073-00
KAIG3-RFI-PC-LC-0338 00 KAIG3-RFI-PC-LC-0338-00
KAIG3-RFI-SW-C-2072 00 KAIG3-RFI-SW-C-2072-00
KAIG3-RFI-SW-C-2071 00 KAIG3-RFI-SW-C-2071-00
KAIG3-RFI-SW-C-2070 00 KAIG3-RFI-SW-C-2070-00
KAIG3-RFI-SW-C-2062 00 KAIG3-RFI-SW-C-2062-00
KAIG3-RFI-SW-C-2061 00 KAIG3-RFI-SW-C-2061-00
KAIG3-RFI-SW-C-2060 00 KAIG3-RFI-SW-C-2060-00
KAIG3-RFI-SW-C-2059 00 KAIG3-RFI-SW-C-2059-00
KAIG3-RFI-SW-C-2058 00 KAIG3-RFI-SW-C-2058-00
KAIG3-RFI-SW-C-1959 01 KAIG3-RFI-SW-C-1959-01
KAIG3-RFI-WG-C-2076 00 KAIG3-RFI-WG-C-2076-00
KAIG3-RFI-WG-C-2075 00 KAIG3-RFI-WG-C-2075-00
KAIG3-RFI-WG-C-2068 00 KAIG3-RFI-WG-C-2068-00
KAIG3-RFI-SG-S-5781 00 KAIG3-RFI-SG-S-5781-00
KAIG3-RFI-AG-S-5780 00 KAIG3-RFI-AG-S-5780-00
KAIG3-RFI-AG-S-5779 00 KAIG3-RFI-AG-S-5779-00
KAIG3-RFI-AG-S-5778 00 KAIG3-RFI-AG-S-5778-00
KAIG3-RFI-AG-S-5777 00 KAIG3-RFI-AG-S-5777-00
KAIG3-RFI-AG-S-5776 00 KAIG3-RFI-AG-S-5776-00
KAIG3-RFI-AG-S-5775 00 KAIG3-RFI-AG-S-5775-00
KAIG3-RFI-AG-S-5774 00 KAIG3-RFI-AG-S-5774-00
KAIG3-RFI-ZG-C-1827 01 KAIG3-RFI-ZG-C-1827-01
KAIG3-RFI-ZG-C-1860 01 KAIG3-RFI-ZG-C-1860-01
KAIG3-RFI-MB-S-5769 00 KAIG3-RFI-MB-S-5769-00
KAIG3-RFI-MB-A-0695 00 KAIG3-RFI-MB-A-0695-00
KAIG3-RFI-SG-C-2067 00 KAIG3-RFI-SG-C-2067-00
KAIG3-RFI-SG-C-2066 00 KAIG3-RFI-SG-C-2066-00
KAIG3-RFI-SG-C-2065 00 KAIG3-RFI-SG-C-2065-00
KAIG3-RFI-SG-C-2064 00 KAIG3-RFI-SG-C-2064-00
KAIG3-RFI-SG-C-2063 00 KAIG3-RFI-SG-C-2063-00
KAIG3-RFI-SG-S-5765 00 KAIG3-RFI-SG-S-5765-00
KAIG3-RFI-CO-C-2069 00 KAIG3-RFI-CO-C-2069-00
KAIG3-RFI-CO-SU-2022 00 KAIG3-RFI-CO-SU-2022-00
KAIG3-RFI-CO-SU-2021 00 KAIG3-RFI-CO-SU-2021-00
KAIG3-RFI-CO-S-5785 00 KAIG3-RFI-CO-S-5785-00
KAIG3-RFI-CO-S-5784 00 KAIG3-RFI-CO-S-5784-00
KAIG3-RFI-CO-S-5783 00 KAIG3-RFI-CO-S-5783-00
KAIG3-RFI-CO-S-5782 00 KAIG3-RFI-CO-S-5782-00
KAIG3-RFI-CO-S-5772 00 KAIG3-RFI-CO-S-5772-00
KAIG3-RFI-CO-S-5771 00 KAIG3-RFI-CO-S-5771-00
KAIG3-RFI-CO-S-5770 00 KAIG3-RFI-CO-S-5770-00
KAIG3-RFI-PC-E-0329 00 KAIG3-RFI-PC-E-0329-00
KAIG3-RFI-CO-E-0328 00 KAIG3-RFI-CO-E-0328-00
KAIG3-RFI-PG-S-5768 00 KAIG3-RFI-PG-S-5768-00
KAIG3-RFI-WG-C-2052 00 KAIG3-RFI-WG-C-2052-00
KAIG3-RFI-WG-C-2051 00 KAIG3-RFI-WG-C-2051-00
KAIG3-RFI-SG-S-5764 00 KAIG3-RFI-SG-S-5764-00
KAIG3-RFI-SG-C-2037 00 KAIG3-RFI-SG-C-2037-00
KAIG3-RFI-WG-LS-0774 00 KAIG3-RFI-WG-LS-0774-00
KAIG3-RFI-PG-S-5763 00 KAIG3-RFI-PG-S-5763-00
KAIG3-RFI-WG-C-2036 00 KAIG3-RFI-WG-C-2036-00
KAIG3-RFI-WG-C-2035 00 KAIG3-RFI-WG-C-2035-00
KAIG3-RFI-WG-LS-0773 00 KAIG3-RFI-WG-LS-0773-00
KAIG3-RFI-SW-LS-0775 00 KAIG3-RFI-SW-LS-0775-00
KAIG3-RFI-SW-LS-0772 00 KAIG3-RFI-SW-LS-0772-00
KAIG3-RFI-SW-C-2057 00 KAIG3-RFI-SW-C-2057-00
KAIG3-RFI-SW-C-2050 00 KAIG3-RFI-SW-C-2050-00
KAIG3-RFI-SW-C-2049 00 KAIG3-RFI-SW-C-2049-00
KAIG3-RFI-SW-C-2048 00 KAIG3-RFI-SW-C-2048-00
KAIG3-RFI-SW-C-2047 00 KAIG3-RFI-SW-C-2047-00
KAIG3-RFI-SW-C-2046 00 KAIG3-RFI-SW-C-2046-00
KAIG3-RFI-SW-C-2045 00 KAIG3-RFI-SW-C-2045-00
KAIG3-RFI-SW-C-2028 00 KAIG3-RFI-SW-C-2028-00
KAIG3-RFI-SW-C-2027 00 KAIG3-RFI-SW-C-2027-00
KAIG3-RFI-SW-C-2026 00 KAIG3-RFI-SW-C-2026-00
KAIG3-RFI-SW-C-2056 00 KAIG3-RFI-SW-C-2056-00
KAIG3-RFI-SW-C-2055 00 KAIG3-RFI-SW-C-2055-00
KAIG3-RFI-SW-C-2054 00 KAIG3-RFI-SW-C-2054-00
KAIG3-RFI-SW-C-2053 00 KAIG3-RFI-SW-C-2053-00
KAIG3-RFI-CO-S-5767 00 KAIG3-RFI-CO-S-5767-00
KAIG3-RFI-CO-S-5766 00 KAIG3-RFI-CO-S-5766-00
KAIG3-RFI-CO-S-5665 01 KAIG3-RFI-CO-S-5665-01
KAIG3-RFI-PC-E-0326 00 KAIG3-RFI-PC-E-0326-00
KAIG3-RFI-PC-LC-0336 00 KAIG3-RFI-PC-LC-0336-00
KAIG3-RFI-CO-SU-2019 00 KAIG3-RFI-CO-SU-2019-00
KAIG3-RFI-PC-LC-0335 00 KAIG3-RFI-PC-LC-0335-00
KAIG3-RFI-PC-LC-0334 00 KAIG3-RFI-PC-LC-0334-00
KAIG3-RFI-SG-LS-0771 00 KAIG3-RFI-SG-LS-0771-00
KAIG3-RFI-SG-C-2021 00 KAIG3-RFI-SG-C-2021-00
KAIG3-RFI-SG-S-5760 00 KAIG3-RFI-SG-S-5760-00
KAIG3-RFI-SG-S-5759 00 KAIG3-RFI-SG-S-5759-00
KAIG3-RFI-ZG-S-5751 00 KAIG3-RFI-ZG-S-5751-00
KAIG3-RFI-ZG-A-0694 00 KAIG3-RFI-ZG-A-0694-00
KAIG3-RFI-WG-C-2034 00 KAIG3-RFI-WG-C-2034-00
KAIG3-RFI-WG-C-2033 00 KAIG3-RFI-WG-C-2033-00
KAIG3-RFI-SW-C-2039 00 KAIG3-RFI-SW-C-2039-00
KAIG3-RFI-WG-LS-0768 00 KAIG3-RFI-WG-LS-0768-00
KAIG3-RFI-WG-LS-0767 00 KAIG3-RFI-WG-LS-0767-00
KAIG3-RFI-WG-C-2020 00 KAIG3-RFI-WG-C-2020-00
KAIG3-RFI-MB-A-0693 00 KAIG3-RFI-MB-A-0693-00
KAIG3-RFI-MB-A-0692 00 KAIG3-RFI-MB-A-0692-00
KAIG3-RFI-SG-A-0691 00 KAIG3-RFI-SG-A-0691-00
KAIG3-RFI-SW-LS-0770 00 KAIG3-RFI-SW-LS-0770-00
KAIG3-RFI-SW-LS-0769 00 KAIG3-RFI-SW-LS-0769-00
KAIG3-RFI-SW-C-2044 00 KAIG3-RFI-SW-C-2044-00
KAIG3-RFI-SW-C-2043 00 KAIG3-RFI-SW-C-2043-00
KAIG3-RFI-SW-C-2042 00 KAIG3-RFI-SW-C-2042-00
KAIG3-RFI-SW-C-2041 00 KAIG3-RFI-SW-C-2041-00
KAIG3-RFI-SW-C-2040 00 KAIG3-RFI-SW-C-2040-00
KAIG3-RFI-SW-C-2038 00 KAIG3-RFI-SW-C-2038-00
KAIG3-RFI-SW-C-2032 00 KAIG3-RFI-SW-C-2032-00
KAIG3-RFI-SW-C-2031 00 KAIG3-RFI-SW-C-2031-00
KAIG3-RFI-SW-C-2030 00 KAIG3-RFI-SW-C-2030-00
KAIG3-RFI-SW-C-2029 00 KAIG3-RFI-SW-C-2029-00
KAIG3-RFI-SW-C-2025 00 KAIG3-RFI-SW-C-2025-00
KAIG3-RFI-SW-C-2024 00 KAIG3-RFI-SW-C-2024-00
KAIG3-RFI-SW-C-2023 00 KAIG3-RFI-SW-C-2023-00
KAIG3-RFI-SW-C-1945 00 KAIG3-RFI-SW-C-1945-00
KAIG3-RFI-CO-SU-2017 00 KAIG3-RFI-CO-SU-2017-00
KAIG3-RFI-CO-S-5758 00 KAIG3-RFI-CO-S-5758-00
KAIG3-RFI-CO-S-5696 01 KAIG3-RFI-CO-S-5696-01
KAIG3-RFI-CO-S-5710 01 KAIG3-RFI-CO-S-5710-01
KAIG3-RFI-CO-S-5709 01 KAIG3-RFI-CO-S-5709-01
KAIG3-RFI-CO-S-5670 01 KAIG3-RFI-CO-S-5670-01
KAIG3-RFI-CO-S-5667 01 KAIG3-RFI-CO-S-5667-01
KAIG3-RFI-CO-SU-2016 00 KAIG3-RFI-CO-SU-2016-00
KAIG3-RFI-CO-S-5757 00 KAIG3-RFI-CO-S-5757-00
KAIG3-RFI-CO-S-5756 00 KAIG3-RFI-CO-S-5756-00
KAIG3-RFI-CO-S-5755 00 KAIG3-RFI-CO-S-5755-00
KAIG3-RFI-SW-LC-0333 00 KAIG3-RFI-SW-LC-0333-00
KAIG3-RFI-SW-E-0325 00 KAIG3-RFI-SW-E-0325-00
KAIG3-RFI-DG-C-2019 00 KAIG3-RFI-DG-C-2019-00
KAIG3-RFI-DG-C-2018 00 KAIG3-RFI-DG-C-2018-00
KAIG3-RFI-PG-S-5750 00 KAIG3-RFI-PG-S-5750-00
KAIG3-RFI-DG-C-2017 00 KAIG3-RFI-DG-C-2017-00
KAIG3-RFI-ZG-C-2016 00 KAIG3-RFI-ZG-C-2016-00
KAIG3-RFI-AG-S-5749 00 KAIG3-RFI-AG-S-5749-00
KAIG3-RFI-PG-S-5748 00 KAIG3-RFI-PG-S-5748-00
KAIG3-RFI-PG-S-5747 00 KAIG3-RFI-PG-S-5747-00
KAIG3-RFI-ZG-S-5746 00 KAIG3-RFI-ZG-S-5746-00
KAIG3-RFI-ZG-S-5741 00 KAIG3-RFI-ZG-S-5741-00
KAIG3-RFI-CO-P-0170 00 KAIG3-RFI-CO-P-0170-00
KAIG3-RFI-SW-C-2015 00 KAIG3-RFI-SW-C-2015-00
KAIG3-RFI-SW-C-2014 00 KAIG3-RFI-SW-C-2014-00
KAIG3-RFI-SW-C-2013 00 KAIG3-RFI-SW-C-2013-00
KAIG3-RFI-SW-C-2012 00 KAIG3-RFI-SW-C-2012-00
KAIG3-RFI-SW-C-2011 00 KAIG3-RFI-SW-C-2011-00
KAIG3-RFI-SW-C-2010 00 KAIG3-RFI-SW-C-2010-00
KAIG3-RFI-SW-C-2009 00 KAIG3-RFI-SW-C-2009-00
KAIG3-RFI-SW-C-2008 00 KAIG3-RFI-SW-C-2008-00
KAIG3-RFI-CO-SU-1982 02 KAIG3-RFI-CO-SU-1982-02
KAIG3-RFI-MC-SU-2015 00 KAIG3-RFI-MC-SU-2015-00
KAIG3-RFI-CO-C-2022 00 KAIG3-RFI-CO-C-2022-00
KAIG3-RFI-MC-S-5754 00 KAIG3-RFI-MC-S-5754-00
KAIG3-RFI-MC-S-5753 00 KAIG3-RFI-MC-S-5753-00
KAIG3-RFI-MC-S-5752 00 KAIG3-RFI-MC-S-5752-00
KAIG3-RFI-CO-S-5602 00 KAIG3-RFI-CO-S-5602-00
KAIG3-RFI-CO-S-5601 01 KAIG3-RFI-CO-S-5601-01
KAIG3-RFI-CO-S-5696 00 KAIG3-RFI-CO-S-5696-00
KAIG3-RFI-WG-C-2007 00 KAIG3-RFI-WG-C-2007-00
KAIG3-RFI-WG-C-2006 00 KAIG3-RFI-WG-C-2006-00
KAIG3-RFI-WG-C-2005 00 KAIG3-RFI-WG-C-2005-00
KAIG3-RFI-WG-C-2004 00 KAIG3-RFI-WG-C-2004-00
KAIG3-RFI-WG-LS-0765 00 KAIG3-RFI-WG-LS-0765-00
KAIG3-RFI-WG-C-1998 00 KAIG3-RFI-WG-C-1998-00
KAIG3-RFI-ZG-S-5740 00 KAIG3-RFI-ZG-S-5740-00
KAIG3-RFI-SG-C-1997 00 KAIG3-RFI-SG-C-1997-00
KAIG3-RFI-SG-S-5739 00 KAIG3-RFI-SG-S-5739-00
KAIG3-RFI-SG-S-5738 00 KAIG3-RFI-SG-S-5738-00
KAIG3-RFI-WG-C-1996 00 KAIG3-RFI-WG-C-1996-00
KAIG3-RFI-WG-LS-0764 00 KAIG3-RFI-WG-LS-0764-00
KAIG3-RFI-WG-C-1988 00 KAIG3-RFI-WG-C-1988-00
KAIG3-RFI-SW-C-1984 00 KAIG3-RFI-SW-C-1984-00
KAIG3-RFI-SW-LS-0766 00 KAIG3-RFI-SW-LS-0766-00
KAIG3-RFI-SW-LS-0763 00 KAIG3-RFI-SW-LS-0763-00
KAIG3-RFI-SW-LS-0762 00 KAIG3-RFI-SW-LS-0762-00
KAIG3-RFI-PA-C-2003 00 KAIG3-RFI-PA-C-2003-00
KAIG3-RFI-PA-C-2002 00 KAIG3-RFI-PA-C-2002-00
KAIG3-RFI-PA-C-2001 00 KAIG3-RFI-PA-C-2001-00
KAIG3-RFI-PA-C-2000 00 KAIG3-RFI-PA-C-2000-00
KAIG3-RFI-SW-LC-0332 00 KAIG3-RFI-SW-LC-0332-00
KAIG3-RFI-PA-C-1999 00 KAIG3-RFI-PA-C-1999-00
KAIG3-RFI-SW-C-1995 00 KAIG3-RFI-SW-C-1995-00
KAIG3-RFI-SW-C-1994 00 KAIG3-RFI-SW-C-1994-00
KAIG3-RFI-SW-C-1993 00 KAIG3-RFI-SW-C-1993-00
KAIG3-RFI-SW-C-1992 00 KAIG3-RFI-SW-C-1992-00
KAIG3-RFI-SW-LC-0331 00 KAIG3-RFI-SW-LC-0331-00
KAIG3-RFI-SW-C-1991 00 KAIG3-RFI-SW-C-1991-00
KAIG3-RFI-SW-C-1990 00 KAIG3-RFI-SW-C-1990-00
KAIG3-RFI-SW-C-1989 00 KAIG3-RFI-SW-C-1989-00
KAIG3-RFI-SW-C-1985 00 KAIG3-RFI-SW-C-1985-00
KAIG3-RFI-SW-C-0794 01 KAIG3-RFI-SW-C-0794-01
KAIG3-RFI-SW-C-0413 01 KAIG3-RFI-SW-C-0413-01
KAIG3-RFI-PC-LC-0330 00 KAIG3-RFI-PC-LC-0330-00
KAIG3-RFI-PC-LC-0329 00 KAIG3-RFI-PC-LC-0329-00
KAIG3-RFI-PC-E-0323 00 KAIG3-RFI-PC-E-0323-00
KAIG3-RFI-CO-S-5417 02 KAIG3-RFI-CO-S-5417-02
KAIG3-RFI-CO-SU-2014 00 KAIG3-RFI-CO-SU-2014-00
KAIG3-RFI-CO-SU-2013 00 KAIG3-RFI-CO-SU-2013-00
KAIG3-RFI-CO-SU-2012 00 KAIG3-RFI-CO-SU-2012-00
KAIG3-RFI-CO-S-5733 00 KAIG3-RFI-CO-S-5733-00
KAIG3-RFI-CO-S-5745 00 KAIG3-RFI-CO-S-5745-00
KAIG3-RFI-CO-S-5744 00 KAIG3-RFI-CO-S-5744-00
KAIG3-RFI-CO-S-5743 00 KAIG3-RFI-CO-S-5743-00
KAIG3-RFI-CO-S-5742 00 KAIG3-RFI-CO-S-5742-00
KAIG3-RFI-CO-S-5737 00 KAIG3-RFI-CO-S-5737-00
KAIG3-RFI-CO-S-5736 00 KAIG3-RFI-CO-S-5736-00
KAIG3-RFI-CO-S-5735 00 KAIG3-RFI-CO-S-5735-00
KAIG3-RFI-CO-S-5734 00 KAIG3-RFI-CO-S-5734-00
KAIG3-RFI-WG-P-0169 00 KAIG3-RFI-WG-P-0169-00
KAIG3-RFI-CO-SU-2011 00 KAIG3-RFI-CO-SU-2011-00
KAIG3-RFI-CO-SU-2010 00 KAIG3-RFI-CO-SU-2010-00
KAIG3-RFI-CO-S-5732 00 KAIG3-RFI-CO-S-5732-00
KAIG3-RFI-CO-S-5731 00 KAIG3-RFI-CO-S-5731-00
KAIG3-RFI-CO-S-5730 00 KAIG3-RFI-CO-S-5730-00
KAIG3-RFI-CO-S-5729 00 KAIG3-RFI-CO-S-5729-00
KAIG3-RFI-CO-SU-2009 00 KAIG3-RFI-CO-SU-2009-00
KAIG3-RFI-CO-S-5725 00 KAIG3-RFI-CO-S-5725-00
KAIG3-RFI-CO-S-5724 00 KAIG3-RFI-CO-S-5724-00
KAIG3-RFI-WG-C-1987 00 KAIG3-RFI-WG-C-1987-00
KAIG3-RFI-WG-C-1986 00 KAIG3-RFI-WG-C-1986-00
KAIG3-RFI-WG-C-1970 00 KAIG3-RFI-WG-C-1970-00
KAIG3-RFI-WG-C-1969 00 KAIG3-RFI-WG-C-1969-00
KAIG3-RFI-WG-C-1968 00 KAIG3-RFI-WG-C-1968-00
KAIG3-RFI-WG-S-5728 00 KAIG3-RFI-WG-S-5728-00
KAIG3-RFI-AG-S-5727 00 KAIG3-RFI-AG-S-5727-00
KAIG3-RFI-ZG-S-5726 00 KAIG3-RFI-ZG-S-5726-00
KAIG3-RFI-WG-LS-0760 00 KAIG3-RFI-WG-LS-0760-00
KAIG3-RFI-WG-LS-0759 00 KAIG3-RFI-WG-LS-0759-00
KAIG3-RFI-PG-A-0690 00 KAIG3-RFI-PG-A-0690-00
KAIG3-RFI-ZG-A-0689 00 KAIG3-RFI-ZG-A-0689-00
KAIG3-RFI-ZG-A-0688 00 KAIG3-RFI-ZG-A-0688-00
KAIG3-RFI-SW-LS-0761 00 KAIG3-RFI-SW-LS-0761-00
KAIG3-RFI-SW-LS-0758 00 KAIG3-RFI-SW-LS-0758-00
KAIG3-RFI-SW-LS-0757 00 KAIG3-RFI-SW-LS-0757-00
KAIG3-RFI-SW-C-1983 00 KAIG3-RFI-SW-C-1983-00
KAIG3-RFI-SW-C-1982 00 KAIG3-RFI-SW-C-1982-00
KAIG3-RFI-SW-C-1981 00 KAIG3-RFI-SW-C-1981-00
KAIG3-RFI-SW-C-1980 00 KAIG3-RFI-SW-C-1980-00
KAIG3-RFI-SW-C-1979 00 KAIG3-RFI-SW-C-1979-00
KAIG3-RFI-SW-C-1978 00 KAIG3-RFI-SW-C-1978-00
KAIG3-RFI-SW-C-1977 00 KAIG3-RFI-SW-C-1977-00
KAIG3-RFI-SW-C-1976 00 KAIG3-RFI-SW-C-1976-00
KAIG3-RFI-SW-C-1975 00 KAIG3-RFI-SW-C-1975-00
KAIG3-RFI-SW-C-1974 00 KAIG3-RFI-SW-C-1974-00
KAIG3-RFI-SW-C-1973 00 KAIG3-RFI-SW-C-1973-00
KAIG3-RFI-WG-C-1967 00 KAIG3-RFI-WG-C-1967-00
KAIG3-RFI-DG-S-5723 00 KAIG3-RFI-DG-S-5723-00
KAIG3-RFI-SG-S-5722 00 KAIG3-RFI-SG-S-5722-00
KAIG3-RFI-ZG-C-1953 00 KAIG3-RFI-ZG-C-1953-00
KAIG3-RFI-WG-C-1952 00 KAIG3-RFI-WG-C-1952-00
KAIG3-RFI-WG-C-1951 00 KAIG3-RFI-WG-C-1951-00
KAIG3-RFI-SW-C-1959 00 KAIG3-RFI-SW-C-1959-00
KAIG3-RFI-SW-C-1957 00 KAIG3-RFI-SW-C-1957-00
KAIG3-RFI-CO-SU-1975 01 KAIG3-RFI-CO-SU-1975-01
KAIG3-RFI-SW-C-1972 00 KAIG3-RFI-SW-C-1972-00
KAIG3-RFI-SW-C-1971 00 KAIG3-RFI-SW-C-1971-00
KAIG3-RFI-SW-C-1965 00 KAIG3-RFI-SW-C-1965-00
KAIG3-RFI-SW-C-1964 00 KAIG3-RFI-SW-C-1964-00
KAIG3-RFI-SW-C-1963 00 KAIG3-RFI-SW-C-1963-00
KAIG3-RFI-CO-S-5647 01 KAIG3-RFI-CO-S-5647-01
KAIG3-RFI-SW-C-1958 00 KAIG3-RFI-SW-C-1958-00
KAIG3-RFI-SW-C-1962 00 KAIG3-RFI-SW-C-1962-00
KAIG3-RFI-SW-C-1961 00 KAIG3-RFI-SW-C-1961-00
KAIG3-RFI-SW-C-1960 00 KAIG3-RFI-SW-C-1960-00
KAIG3-RFI-CO-S-5721 00 KAIG3-RFI-CO-S-5721-00
KAIG3-RFI-WG-C-1931 00 KAIG3-RFI-WG-C-1931-00
KAIG3-RFI-SW-C-1949 00 KAIG3-RFI-SW-C-1949-00
KAIG3-RFI-WG-C-1930 00 KAIG3-RFI-WG-C-1930-00
KAIG3-RFI-SW-C-1948 00 KAIG3-RFI-SW-C-1948-00
KAIG3-RFI-SW-C-1947 00 KAIG3-RFI-SW-C-1947-00
KAIG3-RFI-WG-LS-0756 00 KAIG3-RFI-WG-LS-0756-00
KAIG3-RFI-CO-C-1966 00 KAIG3-RFI-CO-C-1966-00
KAIG3-RFI-SW-C-1946 00 KAIG3-RFI-SW-C-1946-00
KAIG3-RFI-SW-C-1944 00 KAIG3-RFI-SW-C-1944-00
KAIG3-RFI-SW-C-1943 00 KAIG3-RFI-SW-C-1943-00
KAIG3-RFI-SW-C-1942 00 KAIG3-RFI-SW-C-1942-00
KAIG3-RFI-SW-C-1941 00 KAIG3-RFI-SW-C-1941-00
KAIG3-RFI-SW-C-1940 00 KAIG3-RFI-SW-C-1940-00
KAIG3-RFI-SW-C-1938 00 KAIG3-RFI-SW-C-1938-00
KAIG3-RFI-SW-C-1936 00 KAIG3-RFI-SW-C-1936-00
KAIG3-RFI-SW-C-1935 00 KAIG3-RFI-SW-C-1935-00
KAIG3-RFI-PA-C-1955 00 KAIG3-RFI-PA-C-1955-00
KAIG3-RFI-PA-C-1954 00 KAIG3-RFI-PA-C-1954-00
KAIG3-RFI-PA-C-1950 00 KAIG3-RFI-PA-C-1950-00
KAIG3-RFI-SW-C-1937 00 KAIG3-RFI-SW-C-1937-00
KAIG3-RFI-SW-C-1939 00 KAIG3-RFI-SW-C-1939-00
KAIG3-RFI-WG-LS-0703 00 KAIG3-RFI-WG-LS-0703-00
KAIG3-RFI-MB-LC-0312 02 KAIG3-RFI-MB-LC-0312-02
KAIG3-RFI-SG-S-5644 00 KAIG3-RFI-SG-S-5644-00
KAIG3-RFI-PG-S-5649 00 KAIG3-RFI-PG-S-5649-00
KAIG3-RFI-PG-S-5648 00 KAIG3-RFI-PG-S-5648-00
KAIG3-RFI-SW-LS-0755 00 KAIG3-RFI-SW-LS-0755-00
KAIG3-RFI-SW-LS-0754 00 KAIG3-RFI-SW-LS-0754-00
KAIG3-RFI-SW-LS-0753 00 KAIG3-RFI-SW-LS-0753-00
KAIG3-RFI-SW-LS-0752 00 KAIG3-RFI-SW-LS-0752-00
KAIG3-RFI-SW-LS-0751 00 KAIG3-RFI-SW-LS-0751-00
KAIG3-RFI-SW-LS-0750 00 KAIG3-RFI-SW-LS-0750-00
KAIG3-RFI-SW-LS-0749 00 KAIG3-RFI-SW-LS-0749-00
KAIG3-RFI-SW-LS-0748 00 KAIG3-RFI-SW-LS-0748-00
KAIG3-RFI-SW-C-1934 00 KAIG3-RFI-SW-C-1934-00
KAIG3-RFI-SW-C-1926 00 KAIG3-RFI-SW-C-1926-00
KAIG3-RFI-SW-C-1925 00 KAIG3-RFI-SW-C-1925-00
KAIG3-RFI-SW-C-1924 00 KAIG3-RFI-SW-C-1924-00
KAIG3-RFI-SW-C-1920 00 KAIG3-RFI-SW-C-1920-00
KAIG3-RFI-SW-C-1919 00 KAIG3-RFI-SW-C-1919-00
KAIG3-RFI-SW-C-1918 00 KAIG3-RFI-SW-C-1918-00
KAIG3-RFI-SW-C-1917 00 KAIG3-RFI-SW-C-1917-00
KAIG3-RFI-SW-C-1916 00 KAIG3-RFI-SW-C-1916-00
KAIG3-RFI-SW-C-1915 00 KAIG3-RFI-SW-C-1915-00
KAIG3-RFI-SW-C-1912 00 KAIG3-RFI-SW-C-1912-00
KAIG3-RFI-SW-C-1911 00 KAIG3-RFI-SW-C-1911-00
KAIG3-RFI-SW-C-1896 00 KAIG3-RFI-SW-C-1896-00
KAIG3-RFI-SW-C-0817 01 KAIG3-RFI-SW-C-0817-01
KAIG3-RFI-SW-C-0816 01 KAIG3-RFI-SW-C-0816-01
KAIG3-RFI-SW-C-0793 01 KAIG3-RFI-SW-C-0793-01
KAIG3-RFI-SW-C-0411 02 KAIG3-RFI-SW-C-0411-02
KAIG3-RFI-SW-C-0405 01 KAIG3-RFI-SW-C-0405-01
KAIG3-RFI-WG-C-1929 00 KAIG3-RFI-WG-C-1929-00
KAIG3-RFI-WG-C-1928 00 KAIG3-RFI-WG-C-1928-00
KAIG3-RFI-WG-C-1923 00 KAIG3-RFI-WG-C-1923-00
KAIG3-RFI-ZG-A-0687 00 KAIG3-RFI-ZG-A-0687-00
KAIG3-RFI-SG-A-0686 00 KAIG3-RFI-SG-A-0686-00
KAIG3-RFI-ZG-C-1922 00 KAIG3-RFI-ZG-C-1922-00
KAIG3-RFI-SG-S-5720 00 KAIG3-RFI-SG-S-5720-00
KAIG3-RFI-SG-S-5719 00 KAIG3-RFI-SG-S-5719-00
KAIG3-RFI-MB-A-0685 00 KAIG3-RFI-MB-A-0685-00
KAIG3-RFI-SW-C-1927 00 KAIG3-RFI-SW-C-1927-00
KAIG3-RFI-MB-A-0684 00 KAIG3-RFI-MB-A-0684-00
KAIG3-RFI-MB-A-0683 00 KAIG3-RFI-MB-A-0683-00
KAIG3-RFI-WG-C-1921 00 KAIG3-RFI-WG-C-1921-00
KAIG3-RFI-SW-P-0168 00 KAIG3-RFI-SW-P-0168-00
KAIG3-RFI-CO-P-0167 00 KAIG3-RFI-CO-P-0167-00
KAIG3-RFI-WG-P-0166 00 KAIG3-RFI-WG-P-0166-00
KAIG3-RFI-SW-P-0165 00 KAIG3-RFI-SW-P-0165-00
KAIG3-RFI-CO-S-5718 00 KAIG3-RFI-CO-S-5718-00
KAIG3-RFI-CO-S-5716 00 KAIG3-RFI-CO-S-5716-00
KAIG3-RFI-CO-S-5714 00 KAIG3-RFI-CO-S-5714-00
KAIG3-RFI-CO-S-5713 00 KAIG3-RFI-CO-S-5713-00
KAIG3-RFI-CO-SU-2008 00 KAIG3-RFI-CO-SU-2008-00
KAIG3-RFI-CO-SU-2007 00 KAIG3-RFI-CO-SU-2007-00
KAIG3-RFI-CO-C-1933 00 KAIG3-RFI-CO-C-1933-00
KAIG3-RFI-CO-C-1932 00 KAIG3-RFI-CO-C-1932-00
KAIG3-RFI-CO-S-5651 01 KAIG3-RFI-CO-S-5651-01
KAIG3-RFI-CO-S-5645 01 KAIG3-RFI-CO-S-5645-01
KAIG3-RFI-CO-S-5642 01 KAIG3-RFI-CO-S-5642-01
KAIG3-RFI-CO-S-5640 01 KAIG3-RFI-CO-S-5640-01
KAIG3-RFI-CO-S-4700 02 KAIG3-RFI-CO-S-4700-02
KAIG3-RFI-CO-S-5623 01 KAIG3-RFI-CO-S-5623-01
KAIG3-RFI-CO-S-5622 01 KAIG3-RFI-CO-S-5622-01
KAIG3-RFI-CO-S-5715 00 KAIG3-RFI-CO-S-5715-00
KAIG3-RFI-CO-S-5712 00 KAIG3-RFI-CO-S-5712-00
KAIG3-RFI-MC-S-5711 00 KAIG3-RFI-MC-S-5711-00
KAIG3-RFI-SG-S-5707 00 KAIG3-RFI-SG-S-5707-00
KAIG3-RFI-SG-S-5706 00 KAIG3-RFI-SG-S-5706-00
KAIG3-RFI-SG-LS-0747 00 KAIG3-RFI-SG-LS-0747-00
KAIG3-RFI-WG-LS-0746 00 KAIG3-RFI-WG-LS-0746-00
KAIG3-RFI-DG-S-5705 00 KAIG3-RFI-DG-S-5705-00
KAIG3-RFI-SG-S-5704 00 KAIG3-RFI-SG-S-5704-00
KAIG3-RFI-ZG-C-1777 01 KAIG3-RFI-ZG-C-1777-01
KAIG3-RFI-SG-C-1898 00 KAIG3-RFI-SG-C-1898-00
KAIG3-RFI-WG-C-1897 00 KAIG3-RFI-WG-C-1897-00
KAIG3-RFI-WG-LS-0743 00 KAIG3-RFI-WG-LS-0743-00
KAIG3-RFI-WG-LS-0742 00 KAIG3-RFI-WG-LS-0742-00
KAIG3-RFI-WG-LS-0467 01 KAIG3-RFI-WG-LS-0467-01
KAIG3-RFI-WG-C-1908 00 KAIG3-RFI-WG-C-1908-00
KAIG3-RFI-SW-C-1895 00 KAIG3-RFI-SW-C-1895-00
KAIG3-RFI-SW-C-1894 00 KAIG3-RFI-SW-C-1894-00
KAIG3-RFI-SW-C-1893 00 KAIG3-RFI-SW-C-1893-00
KAIG3-RFI-SW-C-0402 02 KAIG3-RFI-SW-C-0402-02
KAIG3-RFI-PG-LC-0322 00 KAIG3-RFI-PG-LC-0322-00
KAIG3-RFI-PG-LC-0324 00 KAIG3-RFI-PG-LC-0324-00
KAIG3-RFI-PG-LC-0327 00 KAIG3-RFI-PG-LC-0327-00
KAIG3-RFI-PG-E-0321 00 KAIG3-RFI-PG-E-0321-00
KAIG3-RFI-SW-LC-0329 00 KAIG3-RFI-SW-LC-0329-00
KAIG3-RFI-SW-LS-0745 00 KAIG3-RFI-SW-LS-0745-00
KAIG3-RFI-SW-LS-0744 00 KAIG3-RFI-SW-LS-0744-00
KAIG3-RFI-SW-C-1906 00 KAIG3-RFI-SW-C-1906-00
KAIG3-RFI-SW-C-1905 00 KAIG3-RFI-SW-C-1905-00
KAIG3-RFI-SW-C-1904 00 KAIG3-RFI-SW-C-1904-00
KAIG3-RFI-SW-C-1903 00 KAIG3-RFI-SW-C-1903-00
KAIG3-RFI-SW-C-1902 00 KAIG3-RFI-SW-C-1902-00
KAIG3-RFI-SW-C-1901 00 KAIG3-RFI-SW-C-1901-00
KAIG3-RFI-SW-C-1900 00 KAIG3-RFI-SW-C-1900-00
KAIG3-RFI-SW-LC-0328-00 00 KAIG3-RFI-SW-LC-0328-00-00
KAIG3-RFI-SW-C-1899 00 KAIG3-RFI-SW-C-1899-00
KAIG3-RFI-SW-C-1914 00 KAIG3-RFI-SW-C-1914-00
KAIG3-RFI-SW-C-1913 00 KAIG3-RFI-SW-C-1913-00
KAIG3-RFI-SW-C-1910 00 KAIG3-RFI-SW-C-1910-00
KAIG3-RFI-SW-C-1909 00 KAIG3-RFI-SW-C-1909-00
KAIG3-RFI-CO-SU-2006 00 KAIG3-RFI-CO-SU-2006-00
KAIG3-RFI-SW-P-0159 01 KAIG3-RFI-SW-P-0159-01
KAIG3-RFI-CO-SU-2005 00 KAIG3-RFI-CO-SU-2005-00
KAIG3-RFI-CO-S-5710 00 KAIG3-RFI-CO-S-5710-00
KAIG3-RFI-CO-S-5709 00 KAIG3-RFI-CO-S-5709-00
KAIG3-RFI-CO-S-5708 00 KAIG3-RFI-CO-S-5708-00
KAIG3-RFI-CO-S-5683 00 KAIG3-RFI-CO-S-5683-00
KAIG3-RFI-CO-S-5682 00 KAIG3-RFI-CO-S-5682-00
KAIG3-RFI-CO-S-5681 00 KAIG3-RFI-CO-S-5681-00
KAIG3-RFI-WG-C-1891 00 KAIG3-RFI-WG-C-1891-00
KAIG3-RFI-WG-C-1883 00 KAIG3-RFI-WG-C-1883-00
KAIG3-RFI-WG-S-5702 00 KAIG3-RFI-WG-S-5702-00
KAIG3-RFI-PG-S-5701 00 KAIG3-RFI-PG-S-5701-00
KAIG3-RFI-AG-S-5700 00 KAIG3-RFI-AG-S-5700-00
KAIG3-RFI-AG-S-5699 00 KAIG3-RFI-AG-S-5699-00
KAIG3-RFI-WG-C-1882 00 KAIG3-RFI-WG-C-1882-00
KAIG3-RFI-SW-C-1892 00 KAIG3-RFI-SW-C-1892-00
KAIG3-RFI-SW-C-1890 00 KAIG3-RFI-SW-C-1890-00
KAIG3-RFI-SW-C-1889 00 KAIG3-RFI-SW-C-1889-00
KAIG3-RFI-SW-C-1888 00 KAIG3-RFI-SW-C-1888-00
KAIG3-RFI-SW-C-1887 00 KAIG3-RFI-SW-C-1887-00
KAIG3-RFI-SW-C-1886 00 KAIG3-RFI-SW-C-1886-00
KAIG3-RFI-SW-C-1885 00 KAIG3-RFI-SW-C-1885-00
KAIG3-RFI-SW-C-1881 00 KAIG3-RFI-SW-C-1881-00
KAIG3-RFI-SW-C-1880 00 KAIG3-RFI-SW-C-1880-00
KAIG3-RFI-SW-C-1879 00 KAIG3-RFI-SW-C-1879-00
KAIG3-RFI-SW-C-1878 00 KAIG3-RFI-SW-C-1878-00
KAIG3-RFI-SW-C-1794 01 KAIG3-RFI-SW-C-1794-01
KAIG3-RFI-SW-C-1793 01 KAIG3-RFI-SW-C-1793-01
KAIG3-RFI-CO-C-1884 00 KAIG3-RFI-CO-C-1884-00
KAIG3-RFI-CO-SU-2004 00 KAIG3-RFI-CO-SU-2004-00
KAIG3-RFI-CO-SU-2003 00 KAIG3-RFI-CO-SU-2003-00
KAIG3-RFI-CO-S-5703 00 KAIG3-RFI-CO-S-5703-00
KAIG3-RFI-CO-S-5698 00 KAIG3-RFI-CO-S-5698-00
KAIG3-RFI-CO-S-5697 00 KAIG3-RFI-CO-S-5697-00
KAIG3-RFI-CO-S-5674 00 KAIG3-RFI-CO-S-5674-00
KAIG3-RFI-CO-S-5695 00 KAIG3-RFI-CO-S-5695-00
KAIG3-RFI-CO-A-0681 01 KAIG3-RFI-CO-A-0681-01
KAIG3-RFI-SW-A-0682 00 KAIG3-RFI-SW-A-0682-00
KAIG3-RFI-PG-S-5688 00 KAIG3-RFI-PG-S-5688-00
KAIG3-RFI-PG-S-5687 00 KAIG3-RFI-PG-S-5687-00
KAIG3-RFI-ZG-S-5686 00 KAIG3-RFI-ZG-S-5686-00
KAIG3-RFI-TG-SU-2000 00 KAIG3-RFI-TG-SU-2000-00
KAIG3-RFI-TG-S-5685 00 KAIG3-RFI-TG-S-5685-00
KAIG3-RFI-ZG-S-5684 00 KAIG3-RFI-ZG-S-5684-00
KAIG3-RFI-ZG-SU-1999 00 KAIG3-RFI-ZG-SU-1999-00
KAIG3-RFI-ZG-SU-1997 00 KAIG3-RFI-ZG-SU-1997-00
KAIG3-RFI-SW-E-0320 00 KAIG3-RFI-SW-E-0320-00
KAIG3-RFI-CO-S-5694 00 KAIG3-RFI-CO-S-5694-00
KAIG3-RFI-CO-S-5693 00 KAIG3-RFI-CO-S-5693-00
KAIG3-RFI-CO-S-5692 00 KAIG3-RFI-CO-S-5692-00
KAIG3-RFI-CO-S-5691 00 KAIG3-RFI-CO-S-5691-00
KAIG3-RFI-CO-S-5690 00 KAIG3-RFI-CO-S-5690-00
KAIG3-RFI-MC-S-5610 01 KAIG3-RFI-MC-S-5610-01
KAIG3-RFI-MC-S-5609 01 KAIG3-RFI-MC-S-5609-01
KAIG3-RFI-CO-S-5617 01 KAIG3-RFI-CO-S-5617-01
KAIG3-RFI-CO-S-5616 01 KAIG3-RFI-CO-S-5616-01
KAIG3-RFI-CO-S-5608 01 KAIG3-RFI-CO-S-5608-01
KAIG3-RFI-SW-LS-0741 00 KAIG3-RFI-SW-LS-0741-00
KAIG3-RFI-SW-LS-0740 00 KAIG3-RFI-SW-LS-0740-00
KAIG3-RFI-MC-S-5613 01 KAIG3-RFI-MC-S-5613-01
KAIG3-RFI-SW-LS-0713 01 KAIG3-RFI-SW-LS-0713-01
KAIG3-RFI-SW-C-1877 00 KAIG3-RFI-SW-C-1877-00
KAIG3-RFI-SW-C-1876 00 KAIG3-RFI-SW-C-1876-00
KAIG3-RFI-MC-S-5612 01 KAIG3-RFI-MC-S-5612-01
KAIG3-RFI-SW-C-1875 00 KAIG3-RFI-SW-C-1875-00
KAIG3-RFI-SW-C-1874 00 KAIG3-RFI-SW-C-1874-00
KAIG3-RFI-SW-C-1873 00 KAIG3-RFI-SW-C-1873-00
KAIG3-RFI-SW-C-1872 00 KAIG3-RFI-SW-C-1872-00
KAIG3-RFI-CO-S-5594 01 KAIG3-RFI-CO-S-5594-01
KAIG3-RFI-SW-C-1870 00 KAIG3-RFI-SW-C-1870-00
KAIG3-RFI-SW-C-1869 00 KAIG3-RFI-SW-C-1869-00
KAIG3-RFI-SW-C-1868 00 KAIG3-RFI-SW-C-1868-00
KAIG3-RFI-SW-C-1867 00 KAIG3-RFI-SW-C-1867-00
KAIG3-RFI-SW-C-1866 00 KAIG3-RFI-SW-C-1866-00
KAIG3-RFI-CO-S-5605 01 KAIG3-RFI-CO-S-5605-01
KAIG3-RFI-CO-S-5603 01 KAIG3-RFI-CO-S-5603-01
KAIG3-RFI-CO-S-5588 01 KAIG3-RFI-CO-S-5588-01
KAIG3-RFI-CO-S-5581 01 KAIG3-RFI-CO-S-5581-01
KAIG3-RFI-CO-S-5579 01 KAIG3-RFI-CO-S-5579-01
KAIG3-RFI-SW-C-1865 00 KAIG3-RFI-SW-C-1865-00
KAIG3-RFI-CO-SU-2002 00 KAIG3-RFI-CO-SU-2002-00
KAIG3-RFI-CO-SU-2001 00 KAIG3-RFI-CO-SU-2001-00
KAIG3-RFI-CO-SU-1982 01 KAIG3-RFI-CO-SU-1982-01
KAIG3-RFI-CO-SU-1964 01 KAIG3-RFI-CO-SU-1964-01
KAIG3-RFI-SW-C-1871 00 KAIG3-RFI-SW-C-1871-00
KAIG3-RFI-PC-LC-0326 00 KAIG3-RFI-PC-LC-0326-00
KAIG3-RFI-PC-LC-0325 00 KAIG3-RFI-PC-LC-0325-00
KAIG3-RFI-PC-E-0324 00 KAIG3-RFI-PC-E-0324-00
KAIG3-RFI-TG-SS-0023 00 KAIG3-RFI-TG-SS-0023-00
KAIG3-RFI-SG-S-5680 00 KAIG3-RFI-SG-S-5680-00
KAIG3-RFI-PG-S-5679 00 KAIG3-RFI-PG-S-5679-00
KAIG3-RFI-ZG-C-1861 00 KAIG3-RFI-ZG-C-1861-00
KAIG3-RFI-ZG-S-5678 00 KAIG3-RFI-ZG-S-5678-00
KAIG3-RFI-ZG-C-1860 00 KAIG3-RFI-ZG-C-1860-00
KAIG3-RFI-ZG-C-1859 00 KAIG3-RFI-ZG-C-1859-00
KAIG3-RFI-SG-S-5677 00 KAIG3-RFI-SG-S-5677-00
KAIG3-RFI-AG-S-5676 00 KAIG3-RFI-AG-S-5676-00
KAIG3-RFI-WG-C-1858 00 KAIG3-RFI-WG-C-1858-00
KAIG3-RFI-TG-S-5675 00 KAIG3-RFI-TG-S-5675-00
KAIG3-RFI-CO-C-1862 00 KAIG3-RFI-CO-C-1862-00
KAIG3-RFI-CO-C-1851 00 KAIG3-RFI-CO-C-1851-00
KAIG3-RFI-CO-SU-1998 00 KAIG3-RFI-CO-SU-1998-00
KAIG3-RFI-PC-LC-0323 00 KAIG3-RFI-PC-LC-0323-00
KAIG3-RFI-PC-E-0322 00 KAIG3-RFI-PC-E-0322-00
KAIG3-RFI-CO-SU-1996 00 KAIG3-RFI-CO-SU-1996-00
KAIG3-RFI-PC-LC-0321 00 KAIG3-RFI-PC-LC-0321-00
KAIG3-RFI-PA-C-1863 00 KAIG3-RFI-PA-C-1863-00
KAIG3-RFI-SW-C-1820 00 KAIG3-RFI-SW-C-1820-00
KAIG3-RFI-SW-LS-0739 00 KAIG3-RFI-SW-LS-0739-00
KAIG3-RFI-SW-C-1864 00 KAIG3-RFI-SW-C-1864-00
KAIG3-RFI-SW-C-1849 00 KAIG3-RFI-SW-C-1849-00
KAIG3-RFI-SW-C-1848 00 KAIG3-RFI-SW-C-1848-00
KAIG3-RFI-SW-C-1847 00 KAIG3-RFI-SW-C-1847-00
KAIG3-RFI-CO-S-5673 00 KAIG3-RFI-CO-S-5673-00
KAIG3-RFI-SW-C-1846 00 KAIG3-RFI-SW-C-1846-00
KAIG3-RFI-CO-S-5672 00 KAIG3-RFI-CO-S-5672-00
KAIG3-RFI-PA-C-1850 00 KAIG3-RFI-PA-C-1850-00
KAIG3-RFI-SW-C-1644 01 KAIG3-RFI-SW-C-1644-01
KAIG3-RFI-SW-C-1634 00 KAIG3-RFI-SW-C-1634-00
KAIG3-RFI-SW-C-1855 00 KAIG3-RFI-SW-C-1855-00
KAIG3-RFI-SW-C-1853 00 KAIG3-RFI-SW-C-1853-00
KAIG3-RFI-SW-C-1852 00 KAIG3-RFI-SW-C-1852-00
KAIG3-RFI-WG-E-0317 00 KAIG3-RFI-WG-E-0317-00
KAIG3-RFI-SW-LS-0738 00 KAIG3-RFI-SW-LS-0738-00
KAIG3-RFI-SW-C-1840 00 KAIG3-RFI-SW-C-1840-00
KAIG3-RFI-SW-C-1839 00 KAIG3-RFI-SW-C-1839-00
KAIG3-RFI-SW-C-1838 00 KAIG3-RFI-SW-C-1838-00
KAIG3-RFI-SW-C-1837 00 KAIG3-RFI-SW-C-1837-00
KAIG3-RFI-SW-C-1836 00 KAIG3-RFI-SW-C-1836-00
KAIG3-RFI-SW-C-1835 00 KAIG3-RFI-SW-C-1835-00
KAIG3-RFI-SW-C-1834 00 KAIG3-RFI-SW-C-1834-00
KAIG3-RFI-SW-C-1833 00 KAIG3-RFI-SW-C-1833-00
KAIG3-RFI-WG-C-1845 00 KAIG3-RFI-WG-C-1845-00
KAIG3-RFI-SW-C-1832 00 KAIG3-RFI-SW-C-1832-00
KAIG3-RFI-WG-C-1844 00 KAIG3-RFI-WG-C-1844-00
KAIG3-RFI-WG-C-1843 00 KAIG3-RFI-WG-C-1843-00
KAIG3-RFI-WG-C-1842 00 KAIG3-RFI-WG-C-1842-00
KAIG3-RFI-AG-S-5668 00 KAIG3-RFI-AG-S-5668-00
KAIG3-RFI-CO-S-5573 01 KAIG3-RFI-CO-S-5573-01
KAIG3-RFI-TG-C-1787 01 KAIG3-RFI-TG-C-1787-01
KAIG3-RFI-SW-C-1818 00 KAIG3-RFI-SW-C-1818-00
KAIG3-RFI-PG-S-5661 00 KAIG3-RFI-PG-S-5661-00
KAIG3-RFI-CO-S-5572 01 KAIG3-RFI-CO-S-5572-01
KAIG3-RFI-PG-S-5660 00 KAIG3-RFI-PG-S-5660-00
KAIG3-RFI-PG-S-5659 00 KAIG3-RFI-PG-S-5659-00
KAIG3-RFI-CO-SS-0022 00 KAIG3-RFI-CO-SS-0022-00
KAIG3-RFI-WG-S-5658 00 KAIG3-RFI-WG-S-5658-00
KAIG3-RFI-CO-C-1841 00 KAIG3-RFI-CO-C-1841-00
KAIG3-RFI-CO-SU-1995 00 KAIG3-RFI-CO-SU-1995-00
KAIG3-RFI-CO-SU-1994 00 KAIG3-RFI-CO-SU-1994-00
KAIG3-RFI-CO-SU-1993 00 KAIG3-RFI-CO-SU-1993-00
KAIG3-RFI-CO-S-5671 00 KAIG3-RFI-CO-S-5671-00
KAIG3-RFI-CO-S-5670 00 KAIG3-RFI-CO-S-5670-00
KAIG3-RFI-CO-S-5669 00 KAIG3-RFI-CO-S-5669-00
KAIG3-RFI-CO-S-5667 00 KAIG3-RFI-CO-S-5667-00
KAIG3-RFI-CO-S-5666 00 KAIG3-RFI-CO-S-5666-00
KAIG3-RFI-CO-S-5665 00 KAIG3-RFI-CO-S-5665-00
KAIG3-RFI-CO-S-5664 00 KAIG3-RFI-CO-S-5664-00
KAIG3-RFI-CO-S-5341 02 KAIG3-RFI-CO-S-5341-02
KAIG3-RFI-WG-C-1831 00 KAIG3-RFI-WG-C-1831-00
KAIG3-RFI-ZG-C-1827 00 KAIG3-RFI-ZG-C-1827-00
KAIG3-RFI-ZG-C-1826 00 KAIG3-RFI-ZG-C-1826-00
KAIG3-RFI-ZG-S-5657 00 KAIG3-RFI-ZG-S-5657-00
KAIG3-RFI-SG-C-1825 00 KAIG3-RFI-SG-C-1825-00
KAIG3-RFI-WG-C-1824 00 KAIG3-RFI-WG-C-1824-00
KAIG3-RFI-WG-C-1823 00 KAIG3-RFI-WG-C-1823-00
KAIG3-RFI-WG-C-1822 00 KAIG3-RFI-WG-C-1822-00
KAIG3-RFI-WG-LS-0736 00 KAIG3-RFI-WG-LS-0736-00
KAIG3-RFI-WG-LS-0734 00 KAIG3-RFI-WG-LS-0734-00
KAIG3-RFI-WG-C-1821 00 KAIG3-RFI-WG-C-1821-00
KAIG3-RFI-WG-LS-0733 00 KAIG3-RFI-WG-LS-0733-00
KAIG3-RFI-SW-LS-0737 00 KAIG3-RFI-SW-LS-0737-00
KAIG3-RFI-WG-C-1808 00 KAIG3-RFI-WG-C-1808-00
KAIG3-RFI-SW-LS-0735 00 KAIG3-RFI-SW-LS-0735-00
KAIG3-RFI-WG-C-1803 00 KAIG3-RFI-WG-C-1803-00
KAIG3-RFI-WG-LS-0729 00 KAIG3-RFI-WG-LS-0729-00
KAIG3-RFI-SW-C-1830 00 KAIG3-RFI-SW-C-1830-00
KAIG3-RFI-SW-C-1829 00 KAIG3-RFI-SW-C-1829-00
KAIG3-RFI-SW-C-1819 00 KAIG3-RFI-SW-C-1819-00
KAIG3-RFI-SW-C-1817 00 KAIG3-RFI-SW-C-1817-00
KAIG3-RFI-SW-C-1816 00 KAIG3-RFI-SW-C-1816-00
KAIG3-RFI-SW-C-1815 00 KAIG3-RFI-SW-C-1815-00
KAIG3-RFI-SW-C-1814 00 KAIG3-RFI-SW-C-1814-00
KAIG3-RFI-SW-C-1813 00 KAIG3-RFI-SW-C-1813-00
KAIG3-RFI-SW-C-1736 00 KAIG3-RFI-SW-C-1736-00
KAIG3-RFI-WG-P-0164 00 KAIG3-RFI-WG-P-0164-00
KAIG3-RFI-WG-P-0163 00 KAIG3-RFI-WG-P-0163-00
KAIG3-RFI-CO-C-1828 00 KAIG3-RFI-CO-C-1828-00
KAIG3-RFI-CO-SU-1991 00 KAIG3-RFI-CO-SU-1991-00
KAIG3-RFI-MC-SU-1990 00 KAIG3-RFI-MC-SU-1990-00
KAIG3-RFI-CO-S-5656 00 KAIG3-RFI-CO-S-5656-00
KAIG3-RFI-CO-S-5655 00 KAIG3-RFI-CO-S-5655-00
KAIG3-RFI-SW-E-0319-00 00 KAIG3-RFI-SW-E-0319-00-00
KAIG3-RFI-MC-S-5654 00 KAIG3-RFI-MC-S-5654-00
KAIG3-RFI-MC-S-5653 00 KAIG3-RFI-MC-S-5653-00
KAIG3-RFI-SW-LS-0731 00 KAIG3-RFI-SW-LS-0731-00
KAIG3-RFI-SW-LS-0730 00 KAIG3-RFI-SW-LS-0730-00
KAIG3-RFI-SW-C-1804 00 KAIG3-RFI-SW-C-1804-00
KAIG3-RFI-SW-LS-0732 00 KAIG3-RFI-SW-LS-0732-00
KAIG3-RFI-SW-LS-0728 00 KAIG3-RFI-SW-LS-0728-00
KAIG3-RFI-SW-LS-0727 00 KAIG3-RFI-SW-LS-0727-00
KAIG3-RFI-SW-C-1812 00 KAIG3-RFI-SW-C-1812-00
KAIG3-RFI-SW-C-1807 00 KAIG3-RFI-SW-C-1807-00
KAIG3-RFI-SW-C-1806 00 KAIG3-RFI-SW-C-1806-00
KAIG3-RFI-SW-C-1805 00 KAIG3-RFI-SW-C-1805-00
KAIG3-RFI-SW-C-1802 00 KAIG3-RFI-SW-C-1802-00
KAIG3-RFI-SW-C-1724 01 KAIG3-RFI-SW-C-1724-01
KAIG3-RFI-CO-SU-1989 00 KAIG3-RFI-CO-SU-1989-00
KAIG3-RFI-CO-SU-1988 00 KAIG3-RFI-CO-SU-1988-00
KAIG3-RFI-CO-S-5652 00 KAIG3-RFI-CO-S-5652-00
KAIG3-RFI-CO-S-5651 00 KAIG3-RFI-CO-S-5651-00
KAIG3-RFI-CO-S-5650 00 KAIG3-RFI-CO-S-5650-00
KAIG3-RFI-CO-S-5647 00 KAIG3-RFI-CO-S-5647-00
KAIG3-RFI-CO-S-5646 00 KAIG3-RFI-CO-S-5646-00
KAIG3-RFI-CO-S-5645 00 KAIG3-RFI-CO-S-5645-00
KAIG3-RFI-CO-C-1811 00 KAIG3-RFI-CO-C-1811-00
KAIG3-RFI-CO-C-1810 00 KAIG3-RFI-CO-C-1810-00
KAIG3-RFI-CO-C-1809 00 KAIG3-RFI-CO-C-1809-00
KAIG3-RFI-CO-A-0681 00 KAIG3-RFI-CO-A-0681-00
KAIG3-RFI-SW-C-1696 01 KAIG3-RFI-SW-C-1696-01
KAIG3-RFI-SW-P-0162 00 KAIG3-RFI-SW-P-0162-00
KAIG3-RFI-WG-P-0161 00 KAIG3-RFI-WG-P-0161-00
KAIG3-RFI-SW-E-0318-00 00 KAIG3-RFI-SW-E-0318-00-00
KAIG3-RFI-WG-C-1797 00 KAIG3-RFI-WG-C-1797-00
KAIG3-RFI-WG-C-1796 00 KAIG3-RFI-WG-C-1796-00
KAIG3-RFI-WG-C-1652 01 KAIG3-RFI-WG-C-1652-01
KAIG3-RFI-PG-S-5637 00 KAIG3-RFI-PG-S-5637-00
KAIG3-RFI-PG-S-5636 00 KAIG3-RFI-PG-S-5636-00
KAIG3-RFI-SG-S-5635 00 KAIG3-RFI-SG-S-5635-00
KAIG3-RFI-SG-S-5634 00 KAIG3-RFI-SG-S-5634-00
KAIG3-RFI-WG-C-1637 01 KAIG3-RFI-WG-C-1637-01
KAIG3-RFI-WG-C-1792 00 KAIG3-RFI-WG-C-1792-00
KAIG3-RFI-CO-SU-1986 00 KAIG3-RFI-CO-SU-1986-00
KAIG3-RFI-CO-SU-1987 00 KAIG3-RFI-CO-SU-1987-00
KAIG3-RFI-CO-SU-1985 00 KAIG3-RFI-CO-SU-1985-00
KAIG3-RFI-CO-SU-1984 00 KAIG3-RFI-CO-SU-1984-00
KAIG3-RFI-CO-S-5643 00 KAIG3-RFI-CO-S-5643-00
KAIG3-RFI-CO-S-5642 00 KAIG3-RFI-CO-S-5642-00
KAIG3-RFI-CO-S-5641 00 KAIG3-RFI-CO-S-5641-00
KAIG3-RFI-CO-S-5640 00 KAIG3-RFI-CO-S-5640-00
KAIG3-RFI-CO-S-5639 00 KAIG3-RFI-CO-S-5639-00
KAIG3-RFI-CO-S-4700 01 KAIG3-RFI-CO-S-4700-01
KAIG3-RFI-SW-LS-0726 00 KAIG3-RFI-SW-LS-0726-00
KAIG3-RFI-SW-LS-0725 00 KAIG3-RFI-SW-LS-0725-00
KAIG3-RFI-SW-LS-0724 00 KAIG3-RFI-SW-LS-0724-00
KAIG3-RFI-SW-C-1801 00 KAIG3-RFI-SW-C-1801-00
KAIG3-RFI-SW-C-1800 00 KAIG3-RFI-SW-C-1800-00
KAIG3-RFI-CO-S-5638 00 KAIG3-RFI-CO-S-5638-00
KAIG3-RFI-SW-C-1799 00 KAIG3-RFI-SW-C-1799-00
KAIG3-RFI-SW-C-1798 00 KAIG3-RFI-SW-C-1798-00
KAIG3-RFI-SW-C-1795 00 KAIG3-RFI-SW-C-1795-00
KAIG3-RFI-SW-C-1794 00 KAIG3-RFI-SW-C-1794-00
KAIG3-RFI-SW-C-1793 00 KAIG3-RFI-SW-C-1793-00
KAIG3-RFI-TG-C-1787 00 KAIG3-RFI-TG-C-1787-00
KAIG3-RFI-WG-C-1786 00 KAIG3-RFI-WG-C-1786-00
KAIG3-RFI-SW-LS-0723 00 KAIG3-RFI-SW-LS-0723-00
KAIG3-RFI-SW-LS-0722 00 KAIG3-RFI-SW-LS-0722-00
KAIG3-RFI-SW-LS-0721 00 KAIG3-RFI-SW-LS-0721-00
KAIG3-RFI-SW-C-1791 00 KAIG3-RFI-SW-C-1791-00
KAIG3-RFI-SW-C-1790 00 KAIG3-RFI-SW-C-1790-00
KAIG3-RFI-SW-C-1788 00 KAIG3-RFI-SW-C-1788-00
KAIG3-RFI-SW-C-1784 00 KAIG3-RFI-SW-C-1784-00
KAIG3-RFI-SW-C-1735 01 KAIG3-RFI-SW-C-1735-01
KAIG3-RFI-SW-C-1715 01 KAIG3-RFI-SW-C-1715-01
KAIG3-RFI-SW-C-1712 01 KAIG3-RFI-SW-C-1712-01
KAIG3-RFI-SW-C-1711 01 KAIG3-RFI-SW-C-1711-01
KAIG3-RFI-SW-C-1705 01 KAIG3-RFI-SW-C-1705-01
KAIG3-RFI-SW-C-1694 01 KAIG3-RFI-SW-C-1694-01
KAIG3-RFI-SW-C-1654 01 KAIG3-RFI-SW-C-1654-01
KAIG3-RFI-SW-C-1653 01 KAIG3-RFI-SW-C-1653-01
KAIG3-RFI-SW-C-1651 01 KAIG3-RFI-SW-C-1651-01
KAIG3-RFI-SW-C-1646 01 KAIG3-RFI-SW-C-1646-01
KAIG3-RFI-SW-C-1574 02 KAIG3-RFI-SW-C-1574-02
KAIG3-RFI-SW-C-1470 02 KAIG3-RFI-SW-C-1470-02
KAIG3-RFI-SW-C-0883 01 KAIG3-RFI-SW-C-0883-01
KAIG3-RFI-SW-C-0882 01 KAIG3-RFI-SW-C-0882-01
KAIG3-RFI-SW-E-0316 00 KAIG3-RFI-SW-E-0316-00
KAIG3-RFI-CO-SS-0020 00 KAIG3-RFI-CO-SS-0020-00
KAIG3-RFI-CO-P-0157 01 KAIG3-RFI-CO-P-0157-01
KAIG3-RFI-MC-SU-1983 00 KAIG3-RFI-MC-SU-1983-00
KAIG3-RFI-CO-SU-1974 00 KAIG3-RFI-CO-SU-1974-00
KAIG3-RFI-CO-S-5633 00 KAIG3-RFI-CO-S-5633-00
KAIG3-RFI-CO-S-5601 00 KAIG3-RFI-CO-S-5601-00
KAIG3-RFI-CO-S-5632 00 KAIG3-RFI-CO-S-5632-00
KAIG3-RFI-CO-S-5631 00 KAIG3-RFI-CO-S-5631-00
KAIG3-RFI-CO-S-5630 00 KAIG3-RFI-CO-S-5630-00
KAIG3-RFI-MC-S-5629 00 KAIG3-RFI-MC-S-5629-00
KAIG3-RFI-MC-S-5628 00 KAIG3-RFI-MC-S-5628-00
KAIG3-RFI-MC-S-5627 00 KAIG3-RFI-MC-S-5627-00
KAIG3-RFI-WG-LS-0720 00 KAIG3-RFI-WG-LS-0720-00
KAIG3-RFI-WG-LS-0719 00 KAIG3-RFI-WG-LS-0719-00
KAIG3-RFI-WG-S-5626 00 KAIG3-RFI-WG-S-5626-00
KAIG3-RFI-WG-C-1783 00 KAIG3-RFI-WG-C-1783-00
KAIG3-RFI-PG-S-5625 00 KAIG3-RFI-PG-S-5625-00
KAIG3-RFI-ZG-C-1777 00 KAIG3-RFI-ZG-C-1777-00
KAIG3-RFI-SG-C-1776 00 KAIG3-RFI-SG-C-1776-00
KAIG3-RFI-AG-S-5624 00 KAIG3-RFI-AG-S-5624-00
KAIG3-RFI-WG-C-1775 00 KAIG3-RFI-WG-C-1775-00
KAIG3-RFI-SW-C-1760 00 KAIG3-RFI-SW-C-1760-00
KAIG3-RFI-SW-LS-0718 00 KAIG3-RFI-SW-LS-0718-00
KAIG3-RFI-SW-LS-0717 00 KAIG3-RFI-SW-LS-0717-00
KAIG3-RFI-SW-C-1780 00 KAIG3-RFI-SW-C-1780-00
KAIG3-RFI-SW-C-1779 00 KAIG3-RFI-SW-C-1779-00
KAIG3-RFI-SW-C-1778 00 KAIG3-RFI-SW-C-1778-00
KAIG3-RFI-SW-C-1774 00 KAIG3-RFI-SW-C-1774-00
KAIG3-RFI-SW-C-1773 00 KAIG3-RFI-SW-C-1773-00
KAIG3-RFI-SW-C-1772 00 KAIG3-RFI-SW-C-1772-00
KAIG3-RFI-SW-C-1771 00 KAIG3-RFI-SW-C-1771-00
KAIG3-RFI-SW-C-1770 00 KAIG3-RFI-SW-C-1770-00
KAIG3-RFI-SW-C-1748 00 KAIG3-RFI-SW-C-1748-00
KAIG3-RFI-MB-LC-0312 01 KAIG3-RFI-MB-LC-0312-01
KAIG3-RFI-CO-SS-0021 00 KAIG3-RFI-CO-SS-0021-00
KAIG3-RFI-CO-SU-1982 00 KAIG3-RFI-CO-SU-1982-00
KAIG3-RFI-CO-C-1785 00 KAIG3-RFI-CO-C-1785-00
KAIG3-RFI-CO-C-1782 00 KAIG3-RFI-CO-C-1782-00
KAIG3-RFI-CO-C-1781 00 KAIG3-RFI-CO-C-1781-00
KAIG3-RFI-WG-P-0160 00 KAIG3-RFI-WG-P-0160-00
KAIG3-RFI-SW-P-0159 00 KAIG3-RFI-SW-P-0159-00
KAIG3-RFI-CO-C-1682 01 KAIG3-RFI-CO-C-1682-01
KAIG3-RFI-CO-S-5545 01 KAIG3-RFI-CO-S-5545-01
KAIG3-RFI-CO-S-5532 01 KAIG3-RFI-CO-S-5532-01
KAIG3-RFI-CO-S-5534 01 KAIG3-RFI-CO-S-5534-01
KAIG3-RFI-CO-S-5417 01 KAIG3-RFI-CO-S-5417-01
KAIG3-RFI-CO-S-5623 00 KAIG3-RFI-CO-S-5623-00
KAIG3-RFI-CO-S-5622 00 KAIG3-RFI-CO-S-5622-00
KAIG3-RFI-CO-S-5430 00 KAIG3-RFI-CO-S-5430-00
KAIG3-RFI-PC-E-0315 00 KAIG3-RFI-PC-E-0315-00
KAIG3-RFI-PC-LC-0320 00 KAIG3-RFI-PC-LC-0320-00
KAIG3-RFI-PC-LC-0319 00 KAIG3-RFI-PC-LC-0319-00
KAIG3-RFI-PC-LC-0318 00 KAIG3-RFI-PC-LC-0318-00
KAIG3-RFI-SW-LS-0716 00 KAIG3-RFI-SW-LS-0716-00
KAIG3-RFI-SW-LS-0715 00 KAIG3-RFI-SW-LS-0715-00
KAIG3-RFI-SW-LS-0714 00 KAIG3-RFI-SW-LS-0714-00
KAIG3-RFI-SW-LS-0713 00 KAIG3-RFI-SW-LS-0713-00
KAIG3-RFI-SW-LS-0712 00 KAIG3-RFI-SW-LS-0712-00
KAIG3-RFI-SW-LS-0711 00 KAIG3-RFI-SW-LS-0711-00
KAIG3-RFI-SW-LS-0710 00 KAIG3-RFI-SW-LS-0710-00
KAIG3-RFI-SW-LS-0709 00 KAIG3-RFI-SW-LS-0709-00
KAIG3-RFI-SW-LS-0708 00 KAIG3-RFI-SW-LS-0708-00
KAIG3-RFI-SW-LS-0707 00 KAIG3-RFI-SW-LS-0707-00
KAIG3-RFI-SW-C-1769 00 KAIG3-RFI-SW-C-1769-00
KAIG3-RFI-SW-C-1768 00 KAIG3-RFI-SW-C-1768-00
KAIG3-RFI-SW-C-1767 00 KAIG3-RFI-SW-C-1767-00
KAIG3-RFI-SW-C-1754 00 KAIG3-RFI-SW-C-1754-00
KAIG3-RFI-SW-C-1753 00 KAIG3-RFI-SW-C-1753-00
KAIG3-RFI-SW-C-1759 00 KAIG3-RFI-SW-C-1759-00
KAIG3-RFI-SW-C-1758 00 KAIG3-RFI-SW-C-1758-00
KAIG3-RFI-SW-C-1757 00 KAIG3-RFI-SW-C-1757-00
KAIG3-RFI-SW-C-1756 00 KAIG3-RFI-SW-C-1756-00
KAIG3-RFI-SW-C-1752 00 KAIG3-RFI-SW-C-1752-00
KAIG3-RFI-SW-C-1750 00 KAIG3-RFI-SW-C-1750-00
KAIG3-RFI-SG-S-5618 00 KAIG3-RFI-SG-S-5618-00
KAIG3-RFI-WG-C-1762 00 KAIG3-RFI-WG-C-1762-00
KAIG3-RFI-WG-C-1761 00 KAIG3-RFI-WG-C-1761-00
KAIG3-RFI-CO-SU-1981 00 KAIG3-RFI-CO-SU-1981-00
KAIG3-RFI-CO-SU-1980 00 KAIG3-RFI-CO-SU-1980-00
KAIG3-RFI-CO-SU-1979 00 KAIG3-RFI-CO-SU-1979-00
KAIG3-RFI-MC-SU-1978 00 KAIG3-RFI-MC-SU-1978-00
KAIG3-RFI-MC-SU-1977 00 KAIG3-RFI-MC-SU-1977-00
KAIG3-RFI-CO-C-1766 00 KAIG3-RFI-CO-C-1766-00
KAIG3-RFI-CO-S-5621 00 KAIG3-RFI-CO-S-5621-00
KAIG3-RFI-CO-S-5620 00 KAIG3-RFI-CO-S-5620-00
KAIG3-RFI-CO-S-5619 00 KAIG3-RFI-CO-S-5619-00
KAIG3-RFI-CO-S-5617 00 KAIG3-RFI-CO-S-5617-00
KAIG3-RFI-CO-S-5616 00 KAIG3-RFI-CO-S-5616-00
KAIG3-RFI-CO-S-5615 00 KAIG3-RFI-CO-S-5615-00
KAIG3-RFI-CO-S-5614 00 KAIG3-RFI-CO-S-5614-00
KAIG3-RFI-MC-S-5613 00 KAIG3-RFI-MC-S-5613-00
KAIG3-RFI-MC-S-5612 00 KAIG3-RFI-MC-S-5612-00
KAIG3-RFI-MC-S-5611 00 KAIG3-RFI-MC-S-5611-00
KAIG3-RFI-MC-S-5610 00 KAIG3-RFI-MC-S-5610-00
KAIG3-RFI-MC-S-5609 00 KAIG3-RFI-MC-S-5609-00
KAIG3-RFI-CO-S-5487 00 KAIG3-RFI-CO-S-5487-00
KAIG3-RFI-SW-C-1765 00 KAIG3-RFI-SW-C-1765-00
KAIG3-RFI-SW-C-1764 00 KAIG3-RFI-SW-C-1764-00
KAIG3-RFI-WG-P-0158 00 KAIG3-RFI-WG-P-0158-00
KAIG3-RFI-WG-LS-0704 00 KAIG3-RFI-WG-LS-0704-00
KAIG3-RFI-SG-S-5606 00 KAIG3-RFI-SG-S-5606-00
KAIG3-RFI-AG-SU-1973 00 KAIG3-RFI-AG-SU-1973-00
KAIG3-RFI-AG-S-5596 00 KAIG3-RFI-AG-S-5596-00
KAIG3-RFI-ZG-S-5595 00 KAIG3-RFI-ZG-S-5595-00
KAIG3-RFI-TG-S-5592 00 KAIG3-RFI-TG-S-5592-00
KAIG3-RFI-TG-SU-1972 00 KAIG3-RFI-TG-SU-1972-00
KAIG3-RFI-TG-SS-0019 00 KAIG3-RFI-TG-SS-0019-00
KAIG3-RFI-CO-SU-1976 00 KAIG3-RFI-CO-SU-1976-00
KAIG3-RFI-CO-SU-1975 00 KAIG3-RFI-CO-SU-1975-00
KAIG3-RFI-CO-SU-1971 00 KAIG3-RFI-CO-SU-1971-00
KAIG3-RFI-CO-C-1751 00 KAIG3-RFI-CO-C-1751-00
KAIG3-RFI-CO-S-5587 00 KAIG3-RFI-CO-S-5587-00
KAIG3-RFI-CO-S-5608 00 KAIG3-RFI-CO-S-5608-00
KAIG3-RFI-CO-S-5594 00 KAIG3-RFI-CO-S-5594-00
KAIG3-RFI-CO-S-5593 00 KAIG3-RFI-CO-S-5593-00
KAIG3-RFI-SW-LS-0706 00 KAIG3-RFI-SW-LS-0706-00
KAIG3-RFI-SW-LS-0705 00 KAIG3-RFI-SW-LS-0705-00
KAIG3-RFI-CO-S-5530 01 KAIG3-RFI-CO-S-5530-01
KAIG3-RFI-SW-LS-0702 00 KAIG3-RFI-SW-LS-0702-00
KAIG3-RFI-SW-LS-0701 00 KAIG3-RFI-SW-LS-0701-00
KAIG3-RFI-CO-S-5607 00 KAIG3-RFI-CO-S-5607-00
KAIG3-RFI-SW-C-1749 00 KAIG3-RFI-SW-C-1749-00
KAIG3-RFI-SW-C-1747 00 KAIG3-RFI-SW-C-1747-00
KAIG3-RFI-SW-C-1746 00 KAIG3-RFI-SW-C-1746-00
KAIG3-RFI-SW-C-1740 00 KAIG3-RFI-SW-C-1740-00
KAIG3-RFI-CO-S-5605 00 KAIG3-RFI-CO-S-5605-00
KAIG3-RFI-CO-S-5604 00 KAIG3-RFI-CO-S-5604-00
KAIG3-RFI-CO-S-5603 00 KAIG3-RFI-CO-S-5603-00
KAIG3-RFI-CO-S-5600 00 KAIG3-RFI-CO-S-5600-00
KAIG3-RFI-CO-S-5599 00 KAIG3-RFI-CO-S-5599-00
KAIG3-RFI-CO-S-5598 00 KAIG3-RFI-CO-S-5598-00
KAIG3-RFI-CO-S-5597 00 KAIG3-RFI-CO-S-5597-00
KAIG3-RFI-SW-E-0314 00 KAIG3-RFI-SW-E-0314-00
KAIG3-RFI-WG-C-1745 00 KAIG3-RFI-WG-C-1745-00
KAIG3-RFI-WG-C-1744 00 KAIG3-RFI-WG-C-1744-00
KAIG3-RFI-AG-C-1743 00 KAIG3-RFI-AG-C-1743-00
KAIG3-RFI-AG-C-1742 00 KAIG3-RFI-AG-C-1742-00
KAIG3-RFI-WG-C-1741 00 KAIG3-RFI-WG-C-1741-00
KAIG3-RFI-WG-S-5585 00 KAIG3-RFI-WG-S-5585-00
KAIG3-RFI-AG-S-5584 00 KAIG3-RFI-AG-S-5584-00
KAIG3-RFI-TG-S-5551 01 KAIG3-RFI-TG-S-5551-01
KAIG3-RFI-SW-LS-0700 00 KAIG3-RFI-SW-LS-0700-00
KAIG3-RFI-SW-LS-0699 00 KAIG3-RFI-SW-LS-0699-00
KAIG3-RFI-SW-LS-0697 00 KAIG3-RFI-SW-LS-0697-00
KAIG3-RFI-SW-LS-0696 00 KAIG3-RFI-SW-LS-0696-00
KAIG3-RFI-SW-C-1739 00 KAIG3-RFI-SW-C-1739-00
KAIG3-RFI-SW-C-1738 00 KAIG3-RFI-SW-C-1738-00
KAIG3-RFI-SW-C-1737 00 KAIG3-RFI-SW-C-1737-00
KAIG3-RFI-SW-C-1735 00 KAIG3-RFI-SW-C-1735-00
KAIG3-RFI-SW-C-1734 00 KAIG3-RFI-SW-C-1734-00
KAIG3-RFI-SW-C-1657 01 KAIG3-RFI-SW-C-1657-01
KAIG3-RFI-SW-C-1468 01 KAIG3-RFI-SW-C-1468-01
KAIG3-RFI-SW-C-1450 02 KAIG3-RFI-SW-C-1450-02
KAIG3-RFI-SW-C-0738 02 KAIG3-RFI-SW-C-0738-02
KAIG3-RFI-CO-SU-1970 00 KAIG3-RFI-CO-SU-1970-00
KAIG3-RFI-CO-SU-1969 00 KAIG3-RFI-CO-SU-1969-00
KAIG3-RFI-CO-S-5591 00 KAIG3-RFI-CO-S-5591-00
KAIG3-RFI-CO-S-5590 00 KAIG3-RFI-CO-S-5590-00
KAIG3-RFI-CO-S-5589 00 KAIG3-RFI-CO-S-5589-00
KAIG3-RFI-CO-S-5588 00 KAIG3-RFI-CO-S-5588-00
KAIG3-RFI-CO-S-5586 00 KAIG3-RFI-CO-S-5586-00
KAIG3-RFI-CO-C-1728 00 KAIG3-RFI-CO-C-1728-00
KAIG3-RFI-CO-C-1727 00 KAIG3-RFI-CO-C-1727-00
KAIG3-RFI-CO-C-1726 00 KAIG3-RFI-CO-C-1726-00
KAIG3-RFI-WG-C-1732 00 KAIG3-RFI-WG-C-1732-00
KAIG3-RFI-SW-LS-0698 00 KAIG3-RFI-SW-LS-0698-00
KAIG3-RFI-SW-C-1733 00 KAIG3-RFI-SW-C-1733-00
KAIG3-RFI-AG-C-1731 00 KAIG3-RFI-AG-C-1731-00
KAIG3-RFI-SW-C-1730 00 KAIG3-RFI-SW-C-1730-00
KAIG3-RFI-SG-S-5583 00 KAIG3-RFI-SG-S-5583-00
KAIG3-RFI-SW-C-1729 00 KAIG3-RFI-SW-C-1729-00
KAIG3-RFI-WG-S-5582 00 KAIG3-RFI-WG-S-5582-00
KAIG3-RFI-SW-C-1725 00 KAIG3-RFI-SW-C-1725-00
KAIG3-RFI-ZG-S-5492 01 KAIG3-RFI-ZG-S-5492-01
KAIG3-RFI-SW-C-1724 00 KAIG3-RFI-SW-C-1724-00
KAIG3-RFI-SW-C-1723 00 KAIG3-RFI-SW-C-1723-00
KAIG3-RFI-SW-C-1722 00 KAIG3-RFI-SW-C-1722-00
KAIG3-RFI-SW-C-1721 00 KAIG3-RFI-SW-C-1721-00
KAIG3-RFI-SW-C-1720 00 KAIG3-RFI-SW-C-1720-00
KAIG3-RFI-SW-C-1719 00 KAIG3-RFI-SW-C-1719-00
KAIG3-RFI-SW-C-1632 01 KAIG3-RFI-SW-C-1632-01
KAIG3-RFI-CO-SU-1968 00 KAIG3-RFI-CO-SU-1968-00
KAIG3-RFI-CO-SU-1967 00 KAIG3-RFI-CO-SU-1967-00
KAIG3-RFI-CO-SU-1966 00 KAIG3-RFI-CO-SU-1966-00
KAIG3-RFI-CO-S-5581 00 KAIG3-RFI-CO-S-5581-00
KAIG3-RFI-CO-S-5580 00 KAIG3-RFI-CO-S-5580-00
KAIG3-RFI-CO-S-5579 00 KAIG3-RFI-CO-S-5579-00
KAIG3-RFI-CO-S-5578 00 KAIG3-RFI-CO-S-5578-00
KAIG3-RFI-CO-S-5577 00 KAIG3-RFI-CO-S-5577-00
KAIG3-RFI-CO-S-5576 00 KAIG3-RFI-CO-S-5576-00
KAIG3-RFI-WG-C-1717 00 KAIG3-RFI-WG-C-1717-00
KAIG3-RFI-WG-C-1714 00 KAIG3-RFI-WG-C-1714-00
KAIG3-RFI-WG-C-1713 00 KAIG3-RFI-WG-C-1713-00
KAIG3-RFI-WG-S-5571 00 KAIG3-RFI-WG-S-5571-00
KAIG3-RFI-WG-C-1707 00 KAIG3-RFI-WG-C-1707-00
KAIG3-RFI-WG-C-1706 00 KAIG3-RFI-WG-C-1706-00
KAIG3-RFI-SG-C-1698 00 KAIG3-RFI-SG-C-1698-00
KAIG3-RFI-PG-S-5568 00 KAIG3-RFI-PG-S-5568-00
KAIG3-RFI-MB-A-0680 00 KAIG3-RFI-MB-A-0680-00
KAIG3-RFI-SG-S-5567 00 KAIG3-RFI-SG-S-5567-00
KAIG3-RFI-SG-S-5566 00 KAIG3-RFI-SG-S-5566-00
KAIG3-RFI-PG-S-5565 00 KAIG3-RFI-PG-S-5565-00
KAIG3-RFI-WG-S-5564 00 KAIG3-RFI-WG-S-5564-00
KAIG3-RFI-WG-LS-0688 00 KAIG3-RFI-WG-LS-0688-00
KAIG3-RFI-WG-LS-0687 00 KAIG3-RFI-WG-LS-0687-00
KAIG3-RFI-WG-LS-0686 00 KAIG3-RFI-WG-LS-0686-00
KAIG3-RFI-WG-C-1697 00 KAIG3-RFI-WG-C-1697-00
KAIG3-RFI-SW-LS-0695 00 KAIG3-RFI-SW-LS-0695-00
KAIG3-RFI-SW-LS-0694 00 KAIG3-RFI-SW-LS-0694-00
KAIG3-RFI-SW-LS-0693 00 KAIG3-RFI-SW-LS-0693-00
KAIG3-RFI-SW-LS-0692 00 KAIG3-RFI-SW-LS-0692-00
KAIG3-RFI-SW-LS-0691 00 KAIG3-RFI-SW-LS-0691-00
KAIG3-RFI-SW-C-1718 00 KAIG3-RFI-SW-C-1718-00
KAIG3-RFI-SW-C-1716 00 KAIG3-RFI-SW-C-1716-00
KAIG3-RFI-SW-C-1715 00 KAIG3-RFI-SW-C-1715-00
KAIG3-RFI-SW-C-1712 00 KAIG3-RFI-SW-C-1712-00
KAIG3-RFI-SW-C-1711 00 KAIG3-RFI-SW-C-1711-00
KAIG3-RFI-SW-C-1710 00 KAIG3-RFI-SW-C-1710-00
KAIG3-RFI-SW-C-1709 00 KAIG3-RFI-SW-C-1709-00
KAIG3-RFI-SW-C-1708 00 KAIG3-RFI-SW-C-1708-00
KAIG3-RFI-SW-C-1585 01 KAIG3-RFI-SW-C-1585-01
KAIG3-RFI-SW-C-1584 01 KAIG3-RFI-SW-C-1584-01
KAIG3-RFI-CO-SU-1965 00 KAIG3-RFI-CO-SU-1965-00
KAIG3-RFI-CO-SU-1964 00 KAIG3-RFI-CO-SU-1964-00
KAIG3-RFI-CO-SU-1962 00 KAIG3-RFI-CO-SU-1962-00
KAIG3-RFI-CO-S-5570 00 KAIG3-RFI-CO-S-5570-00
KAIG3-RFI-CO-S-5569 00 KAIG3-RFI-CO-S-5569-00
KAIG3-RFI-CO-S-5575 00 KAIG3-RFI-CO-S-5575-00
KAIG3-RFI-CO-S-5574 00 KAIG3-RFI-CO-S-5574-00
KAIG3-RFI-CO-S-5573 00 KAIG3-RFI-CO-S-5573-00
KAIG3-RFI-CO-S-5572 00 KAIG3-RFI-CO-S-5572-00
KAIG3-RFI-SW-LS-0690 00 KAIG3-RFI-SW-LS-0690-00
KAIG3-RFI-SW-LS-0689 00 KAIG3-RFI-SW-LS-0689-00
KAIG3-RFI-SW-C-1705 00 KAIG3-RFI-SW-C-1705-00
KAIG3-RFI-SW-C-1694 00 KAIG3-RFI-SW-C-1694-00
KAIG3-RFI-SW-C-1594 01 KAIG3-RFI-SW-C-1594-01
KAIG3-RFI-SW-C-1593 01 KAIG3-RFI-SW-C-1593-01
KAIG3-RFI-SW-C-1574 01 KAIG3-RFI-SW-C-1574-01
KAIG3-RFI-SW-C-1572 01 KAIG3-RFI-SW-C-1572-01
KAIG3-RFI-CO-LC-0165 01 KAIG3-RFI-CO-LC-0165-01
KAIG3-RFI-CO-C-1704 00 KAIG3-RFI-CO-C-1704-00
KAIG3-RFI-CO-C-1703 00 KAIG3-RFI-CO-C-1703-00
KAIG3-RFI-CO-C-1702 00 KAIG3-RFI-CO-C-1702-00
KAIG3-RFI-CO-C-1701 00 KAIG3-RFI-CO-C-1701-00
KAIG3-RFI-CO-S-5510 01 KAIG3-RFI-CO-S-5510-01
KAIG3-RFI-CO-S-5495 01 KAIG3-RFI-CO-S-5495-01
KAIG3-RFI-CO-S-5508 01 KAIG3-RFI-CO-S-5508-01
KAIG3-RFI-CO-S-5507 01 KAIG3-RFI-CO-S-5507-01
KAIG3-RFI-CO-S-5503 01 KAIG3-RFI-CO-S-5503-01
KAIG3-RFI-CO-S-5501 01 KAIG3-RFI-CO-S-5501-01
KAIG3-RFI-CO-S-5500 01 KAIG3-RFI-CO-S-5500-01
KAIG3-RFI-CO-SU-1963 00 KAIG3-RFI-CO-SU-1963-00
KAIG3-RFI-CO-S-5563 00 KAIG3-RFI-CO-S-5563-00
KAIG3-RFI-CO-S-5562 00 KAIG3-RFI-CO-S-5562-00
KAIG3-RFI-SW-C-1700 00 KAIG3-RFI-SW-C-1700-00
KAIG3-RFI-SW-C-1699 00 KAIG3-RFI-SW-C-1699-00
KAIG3-RFI-SW-C-1696 00 KAIG3-RFI-SW-C-1696-00
KAIG3-RFI-SW-C-1695 00 KAIG3-RFI-SW-C-1695-00
KAIG3-RFI-AG-C-1693 00 KAIG3-RFI-AG-C-1693-00
KAIG3-RFI-SG-LS-0684 00 KAIG3-RFI-SG-LS-0684-00
KAIG3-RFI-AG-C-1692 00 KAIG3-RFI-AG-C-1692-00
KAIG3-RFI-ZG-S-5561 00 KAIG3-RFI-ZG-S-5561-00
KAIG3-RFI-ZG-SU-1961 00 KAIG3-RFI-ZG-SU-1961-00
KAIG3-RFI-ZG-SU-1960 00 KAIG3-RFI-ZG-SU-1960-00
KAIG3-RFI-ZG-S-5560 00 KAIG3-RFI-ZG-S-5560-00
KAIG3-RFI-SG-S-5555 00 KAIG3-RFI-SG-S-5555-00
KAIG3-RFI-DG-S-5554 00 KAIG3-RFI-DG-S-5554-00
KAIG3-RFI-DG-SU-1959 00 KAIG3-RFI-DG-SU-1959-00
KAIG3-RFI-ZG-A-0679 00 KAIG3-RFI-ZG-A-0679-00
KAIG3-RFI-SG-S-5553 00 KAIG3-RFI-SG-S-5553-00
KAIG3-RFI-SW-LS-0685 00 KAIG3-RFI-SW-LS-0685-00
KAIG3-RFI-SW-LS-0683 00 KAIG3-RFI-SW-LS-0683-00
KAIG3-RFI-SW-LS-0682 00 KAIG3-RFI-SW-LS-0682-00
KAIG3-RFI-SW-C-1680 00 KAIG3-RFI-SW-C-1680-00
KAIG3-RFI-SW-C-1635 01 KAIG3-RFI-SW-C-1635-01
KAIG3-RFI-SW-C-1629 01 KAIG3-RFI-SW-C-1629-01
KAIG3-RFI-SW-C-1624 01 KAIG3-RFI-SW-C-1624-01
KAIG3-RFI-SW-C-1587 01 KAIG3-RFI-SW-C-1587-01
KAIG3-RFI-SW-C-1470 01 KAIG3-RFI-SW-C-1470-01
KAIG3-RFI-SW-C-1451 02 KAIG3-RFI-SW-C-1451-02
KAIG3-RFI-CO-C-1691 00 KAIG3-RFI-CO-C-1691-00
KAIG3-RFI-CO-C-1638 01 KAIG3-RFI-CO-C-1638-01
KAIG3-RFI-CO-SU-1958 00 KAIG3-RFI-CO-SU-1958-00
KAIG3-RFI-CO-S-5559 00 KAIG3-RFI-CO-S-5559-00
KAIG3-RFI-CO-S-5558 00 KAIG3-RFI-CO-S-5558-00
KAIG3-RFI-CO-S-5557 00 KAIG3-RFI-CO-S-5557-00
KAIG3-RFI-CO-S-5556 00 KAIG3-RFI-CO-S-5556-00
KAIG3-RFI-CO-P-0157 00 KAIG3-RFI-CO-P-0157-00
KAIG3-RFI-PG-LC-0317 00 KAIG3-RFI-PG-LC-0317-00
KAIG3-RFI-PG-LC-0316 00 KAIG3-RFI-PG-LC-0316-00
KAIG3-RFI-PG-LC-0315 00 KAIG3-RFI-PG-LC-0315-00
KAIG3-RFI-SW-C-1619 01 KAIG3-RFI-SW-C-1619-01
KAIG3-RFI-SW-C-1618 01 KAIG3-RFI-SW-C-1618-01
KAIG3-RFI-SW-C-1605 01 KAIG3-RFI-SW-C-1605-01
KAIG3-RFI-SW-C-1604 01 KAIG3-RFI-SW-C-1604-01
KAIG3-RFI-SW-C-1602 01 KAIG3-RFI-SW-C-1602-01
KAIG3-RFI-SW-C-1601 01 KAIG3-RFI-SW-C-1601-01
KAIG3-RFI-SW-C-1492 02 KAIG3-RFI-SW-C-1492-02
KAIG3-RFI-SW-C-1469 01 KAIG3-RFI-SW-C-1469-01
KAIG3-RFI-SW-C-1467 01 KAIG3-RFI-SW-C-1467-01
KAIG3-RFI-SW-C-0738 01 KAIG3-RFI-SW-C-0738-01
KAIG3-RFI-PA-C-1679 00 KAIG3-RFI-PA-C-1679-00
KAIG3-RFI-PA-C-1678 00 KAIG3-RFI-PA-C-1678-00
KAIG3-RFI-SW-C-1677 00 KAIG3-RFI-SW-C-1677-00
KAIG3-RFI-PA-C-1676 00 KAIG3-RFI-PA-C-1676-00
KAIG3-RFI-PA-C-1675 00 KAIG3-RFI-PA-C-1675-00
KAIG3-RFI-PA-C-1674 00 KAIG3-RFI-PA-C-1674-00
KAIG3-RFI-PA-C-1670 00 KAIG3-RFI-PA-C-1670-00
KAIG3-RFI-PA-C-1669 00 KAIG3-RFI-PA-C-1669-00
KAIG3-RFI-PA-C-1668 00 KAIG3-RFI-PA-C-1668-00
KAIG3-RFI-PA-C-1667 00 KAIG3-RFI-PA-C-1667-00
KAIG3-RFI-PA-C-1666 00 KAIG3-RFI-PA-C-1666-00
KAIG3-RFI-DG-S-5552 00 KAIG3-RFI-DG-S-5552-00
KAIG3-RFI-TG-S-5551 00 KAIG3-RFI-TG-S-5551-00
KAIG3-RFI-WG-C-1689 00 KAIG3-RFI-WG-C-1689-00
KAIG3-RFI-WG-C-1688 00 KAIG3-RFI-WG-C-1688-00
KAIG3-RFI-WG-C-1687 00 KAIG3-RFI-WG-C-1687-00
KAIG3-RFI-WG-C-1686 00 KAIG3-RFI-WG-C-1686-00
KAIG3-RFI-WG-C-1685 00 KAIG3-RFI-WG-C-1685-00
KAIG3-RFI-MB-A-0678 00 KAIG3-RFI-MB-A-0678-00
KAIG3-RFI-MB-A-0677 00 KAIG3-RFI-MB-A-0677-00
KAIG3-RFI-MB-A-0676 00 KAIG3-RFI-MB-A-0676-00
KAIG3-RFI-ZG-A-0675 00 KAIG3-RFI-ZG-A-0675-00
KAIG3-RFI-AG-S-5539 00 KAIG3-RFI-AG-S-5539-00
KAIG3-RFI-AG-SS-0018 00 KAIG3-RFI-AG-SS-0018-00
KAIG3-RFI-AG-SU-1954 00 KAIG3-RFI-AG-SU-1954-00
KAIG3-RFI-CO-C-1690 00 KAIG3-RFI-CO-C-1690-00
KAIG3-RFI-CO-C-1684 00 KAIG3-RFI-CO-C-1684-00
KAIG3-RFI-CO-C-1683 00 KAIG3-RFI-CO-C-1683-00
KAIG3-RFI-CO-C-1682 00 KAIG3-RFI-CO-C-1682-00
KAIG3-RFI-CO-C-1681 00 KAIG3-RFI-CO-C-1681-00
KAIG3-RFI-CO-SU-1957 00 KAIG3-RFI-CO-SU-1957-00
KAIG3-RFI-CO-S-5485 01 KAIG3-RFI-CO-S-5485-01
KAIG3-RFI-CO-S-5483 01 KAIG3-RFI-CO-S-5483-01
KAIG3-RFI-CO-S-5176 01 KAIG3-RFI-CO-S-5176-01
KAIG3-RFI-CO-S-5550 00 KAIG3-RFI-CO-S-5550-00
KAIG3-RFI-CO-S-5549 00 KAIG3-RFI-CO-S-5549-00
KAIG3-RFI-CO-S-5548 00 KAIG3-RFI-CO-S-5548-00
KAIG3-RFI-CO-S-5547 00 KAIG3-RFI-CO-S-5547-00
KAIG3-RFI-PG-E-0306 00 KAIG3-RFI-PG-E-0306-00
KAIG3-RFI-SW-LS-0681 00 KAIG3-RFI-SW-LS-0681-00
KAIG3-RFI-SW-LS-0680 00 KAIG3-RFI-SW-LS-0680-00
KAIG3-RFI-CO-C-1673 00 KAIG3-RFI-CO-C-1673-00
KAIG3-RFI-SW-C-1665 00 KAIG3-RFI-SW-C-1665-00
KAIG3-RFI-CO-C-1672 00 KAIG3-RFI-CO-C-1672-00
KAIG3-RFI-SW-C-1664 00 KAIG3-RFI-SW-C-1664-00
KAIG3-RFI-SW-C-1663 00 KAIG3-RFI-SW-C-1663-00
KAIG3-RFI-CO-C-1671 00 KAIG3-RFI-CO-C-1671-00
KAIG3-RFI-SW-C-1662 00 KAIG3-RFI-SW-C-1662-00
KAIG3-RFI-SW-C-1661 00 KAIG3-RFI-SW-C-1661-00
KAIG3-RFI-SW-C-1660 00 KAIG3-RFI-SW-C-1660-00
KAIG3-RFI-CO-SS-0017 00 KAIG3-RFI-CO-SS-0017-00
KAIG3-RFI-CO-SU-1956 00 KAIG3-RFI-CO-SU-1956-00
KAIG3-RFI-SW-C-1659 00 KAIG3-RFI-SW-C-1659-00
KAIG3-RFI-SW-C-1432 02 KAIG3-RFI-SW-C-1432-02
KAIG3-RFI-SW-C-1412 02 KAIG3-RFI-SW-C-1412-02
KAIG3-RFI-CO-SU-1955 00 KAIG3-RFI-CO-SU-1955-00
KAIG3-RFI-SW-C-1400 02 KAIG3-RFI-SW-C-1400-02
KAIG3-RFI-CO-SU-1952 00 KAIG3-RFI-CO-SU-1952-00
KAIG3-RFI-CO-SU-1951 00 KAIG3-RFI-CO-SU-1951-00
KAIG3-RFI-CO-SU-1950 00 KAIG3-RFI-CO-SU-1950-00
KAIG3-RFI-CO-S-5546 00 KAIG3-RFI-CO-S-5546-00
KAIG3-RFI-CO-S-5545 00 KAIG3-RFI-CO-S-5545-00
KAIG3-RFI-WG-P-0156 00 KAIG3-RFI-WG-P-0156-00
KAIG3-RFI-WG-LS-0679 00 KAIG3-RFI-WG-LS-0679-00
KAIG3-RFI-SG-S-4663 01 KAIG3-RFI-SG-S-4663-01
KAIG3-RFI-CO-S-5544 00 KAIG3-RFI-CO-S-5544-00
KAIG3-RFI-PG-S-5541 00 KAIG3-RFI-PG-S-5541-00
KAIG3-RFI-CO-S-5543 00 KAIG3-RFI-CO-S-5543-00
KAIG3-RFI-PG-S-5540 00 KAIG3-RFI-PG-S-5540-00
KAIG3-RFI-SG-S-5538 00 KAIG3-RFI-SG-S-5538-00
KAIG3-RFI-CO-S-5542 00 KAIG3-RFI-CO-S-5542-00
KAIG3-RFI-SG-S-5537 00 KAIG3-RFI-SG-S-5537-00
KAIG3-RFI-SG-SU-1953 00 KAIG3-RFI-SG-SU-1953-00
KAIG3-RFI-CO-S-5536 00 KAIG3-RFI-CO-S-5536-00
KAIG3-RFI-CO-S-5535 00 KAIG3-RFI-CO-S-5535-00
KAIG3-RFI-CO-S-5534 00 KAIG3-RFI-CO-S-5534-00
KAIG3-RFI-CO-S-5533 00 KAIG3-RFI-CO-S-5533-00
KAIG3-RFI-CO-S-5532 00 KAIG3-RFI-CO-S-5532-00
KAIG3-RFI-CO-S-5531 00 KAIG3-RFI-CO-S-5531-00
KAIG3-RFI-PC-E-0313 00 KAIG3-RFI-PC-E-0313-00
KAIG3-RFI-PC-LC-0314 00 KAIG3-RFI-PC-LC-0314-00
KAIG3-RFI-MB-LC-0313 00 KAIG3-RFI-MB-LC-0313-00
KAIG3-RFI-CO-SS-0015 00 KAIG3-RFI-CO-SS-0015-00
KAIG3-RFI-CO-SS-0016 00 KAIG3-RFI-CO-SS-0016-00
KAIG3-RFI-ZG-S-5526 00 KAIG3-RFI-ZG-S-5526-00
KAIG3-RFI-ZG-A-0674 00 KAIG3-RFI-ZG-A-0674-00
KAIG3-RFI-ZG-S-5525 00 KAIG3-RFI-ZG-S-5525-00
KAIG3-RFI-SG-S-5524 00 KAIG3-RFI-SG-S-5524-00
KAIG3-RFI-TG-S-5523 00 KAIG3-RFI-TG-S-5523-00
KAIG3-RFI-TG-S-5522 00 KAIG3-RFI-TG-S-5522-00
KAIG3-RFI-TG-S-5521 00 KAIG3-RFI-TG-S-5521-00
KAIG3-RFI-CO-SU-1949 00 KAIG3-RFI-CO-SU-1949-00
KAIG3-RFI-CO-SU-1948 00 KAIG3-RFI-CO-SU-1948-00
KAIG3-RFI-CO-SU-1947 00 KAIG3-RFI-CO-SU-1947-00
KAIG3-RFI-CO-S-5530 00 KAIG3-RFI-CO-S-5530-00
KAIG3-RFI-CO-S-5529 00 KAIG3-RFI-CO-S-5529-00
KAIG3-RFI-CO-S-5528 00 KAIG3-RFI-CO-S-5528-00
KAIG3-RFI-CO-S-5527 00 KAIG3-RFI-CO-S-5527-00
KAIG3-RFI-CO-S-5520 00 KAIG3-RFI-CO-S-5520-00
KAIG3-RFI-CO-S-5519 00 KAIG3-RFI-CO-S-5519-00
KAIG3-RFI-CO-S-5416 02 KAIG3-RFI-CO-S-5416-02
KAIG3-RFI-MB-A-0673 00 KAIG3-RFI-MB-A-0673-00
KAIG3-RFI-SW-LS-0678 00 KAIG3-RFI-SW-LS-0678-00
KAIG3-RFI-SW-C-1658 00 KAIG3-RFI-SW-C-1658-00
KAIG3-RFI-SW-C-1657 00 KAIG3-RFI-SW-C-1657-00
KAIG3-RFI-SW-C-1656 00 KAIG3-RFI-SW-C-1656-00
KAIG3-RFI-SW-C-1650 00 KAIG3-RFI-SW-C-1650-00
KAIG3-RFI-SW-C-1649 00 KAIG3-RFI-SW-C-1649-00
KAIG3-RFI-SW-C-1586 01 KAIG3-RFI-SW-C-1586-01
KAIG3-RFI-SW-C-1497 01 KAIG3-RFI-SW-C-1497-01
KAIG3-RFI-PA-S-2959 01 KAIG3-RFI-PA-S-2959-01
KAIG3-RFI-CO-C-1598 00 KAIG3-RFI-CO-C-1598-00
KAIG3-RFI-WG-C-1655 00 KAIG3-RFI-WG-C-1655-00
KAIG3-RFI-WG-C-1652 00 KAIG3-RFI-WG-C-1652-00
KAIG3-RFI-AG-S-5515 00 KAIG3-RFI-AG-S-5515-00
KAIG3-RFI-GN-LS-0677 00 KAIG3-RFI-GN-LS-0677-00
KAIG3-RFI-WG-C-1647 00 KAIG3-RFI-WG-C-1647-00
KAIG3-RFI-WG-LS-0676 00 KAIG3-RFI-WG-LS-0676-00
KAIG3-RFI-ZG-S-5512 00 KAIG3-RFI-ZG-S-5512-00
KAIG3-RFI-DG-S-5511 00 KAIG3-RFI-DG-S-5511-00
KAIG3-RFI-SW-C-1654 00 KAIG3-RFI-SW-C-1654-00
KAIG3-RFI-SW-C-1653 00 KAIG3-RFI-SW-C-1653-00
KAIG3-RFI-SW-C-1651 00 KAIG3-RFI-SW-C-1651-00
KAIG3-RFI-SW-C-1646 00 KAIG3-RFI-SW-C-1646-00
KAIG3-RFI-SW-C-1645 00 KAIG3-RFI-SW-C-1645-00
KAIG3-RFI-SW-C-1644 00 KAIG3-RFI-SW-C-1644-00
KAIG3-RFI-CO-C-1648 00 KAIG3-RFI-CO-C-1648-00
KAIG3-RFI-CO-SU-1946 00 KAIG3-RFI-CO-SU-1946-00
KAIG3-RFI-CO-SU-1945 00 KAIG3-RFI-CO-SU-1945-00
KAIG3-RFI-CO-SU-1944 00 KAIG3-RFI-CO-SU-1944-00
KAIG3-RFI-CO-S-5518 00 KAIG3-RFI-CO-S-5518-00
KAIG3-RFI-CO-S-5517 00 KAIG3-RFI-CO-S-5517-00
KAIG3-RFI-CO-S-5516 00 KAIG3-RFI-CO-S-5516-00
KAIG3-RFI-MC-S-5514 00 KAIG3-RFI-MC-S-5514-00
KAIG3-RFI-CO-S-5510 00 KAIG3-RFI-CO-S-5510-00
KAIG3-RFI-CO-S-5509 00 KAIG3-RFI-CO-S-5509-00
KAIG3-RFI-CO-SS-0012 02 KAIG3-RFI-CO-SS-0012-02
KAIG3-RFI-CO-SS-0011 02 KAIG3-RFI-CO-SS-0011-02
KAIG3-RFI-SW-LS-0675 00 KAIG3-RFI-SW-LS-0675-00
KAIG3-RFI-SW-LS-0674 00 KAIG3-RFI-SW-LS-0674-00
KAIG3-RFI-SW-C-1641 00 KAIG3-RFI-SW-C-1641-00
KAIG3-RFI-SW-C-1635 00 KAIG3-RFI-SW-C-1635-00
KAIG3-RFI-SW-C-1633 00 KAIG3-RFI-SW-C-1633-00
KAIG3-RFI-SW-C-1632 00 KAIG3-RFI-SW-C-1632-00
KAIG3-RFI-SW-C-1631 00 KAIG3-RFI-SW-C-1631-00
KAIG3-RFI-SW-C-1630 00 KAIG3-RFI-SW-C-1630-00
KAIG3-RFI-SW-C-1629 00 KAIG3-RFI-SW-C-1629-00
KAIG3-RFI-SW-C-1624 00 KAIG3-RFI-SW-C-1624-00
KAIG3-RFI-CO-S-5452 01 KAIG3-RFI-CO-S-5452-01
KAIG3-RFI-CO-S-5451 01 KAIG3-RFI-CO-S-5451-01
KAIG3-RFI-CO-S-5449 01 KAIG3-RFI-CO-S-5449-01
KAIG3-RFI-CO-C-1638 00 KAIG3-RFI-CO-C-1638-00
KAIG3-RFI-CO-S-5448 01 KAIG3-RFI-CO-S-5448-01
KAIG3-RFI-CO-S-5447 01 KAIG3-RFI-CO-S-5447-01
KAIG3-RFI-WG-C-1640 00 KAIG3-RFI-WG-C-1640-00
KAIG3-RFI-CO-S-5495 00 KAIG3-RFI-CO-S-5495-00
KAIG3-RFI-WG-C-1639 00 KAIG3-RFI-WG-C-1639-00
KAIG3-RFI-WG-C-1637 00 KAIG3-RFI-WG-C-1637-00
KAIG3-RFI-ZG-A-0672 00 KAIG3-RFI-ZG-A-0672-00
KAIG3-RFI-WG-LS-0673 00 KAIG3-RFI-WG-LS-0673-00
KAIG3-RFI-SW-C-1643 00 KAIG3-RFI-SW-C-1643-00
KAIG3-RFI-WG-C-1636 00 KAIG3-RFI-WG-C-1636-00
KAIG3-RFI-SW-C-1642 00 KAIG3-RFI-SW-C-1642-00
KAIG3-RFI-TG-S-5505 00 KAIG3-RFI-TG-S-5505-00
KAIG3-RFI-ZG-A-0671 00 KAIG3-RFI-ZG-A-0671-00
KAIG3-RFI-ZG-C-1621 00 KAIG3-RFI-ZG-C-1621-00
KAIG3-RFI-AG-C-1611 00 KAIG3-RFI-AG-C-1611-00
KAIG3-RFI-MB-A-0670 00 KAIG3-RFI-MB-A-0670-00
KAIG3-RFI-MB-A-0669 00 KAIG3-RFI-MB-A-0669-00
KAIG3-RFI-SW-LS-0672 00 KAIG3-RFI-SW-LS-0672-00
KAIG3-RFI-SW-LS-0671 00 KAIG3-RFI-SW-LS-0671-00
KAIG3-RFI-SW-C-1628 00 KAIG3-RFI-SW-C-1628-00
KAIG3-RFI-SW-C-1627 00 KAIG3-RFI-SW-C-1627-00
KAIG3-RFI-SW-C-1626 00 KAIG3-RFI-SW-C-1626-00
KAIG3-RFI-SW-C-1623 00 KAIG3-RFI-SW-C-1623-00
KAIG3-RFI-SW-C-1622 00 KAIG3-RFI-SW-C-1622-00
KAIG3-RFI-SW-C-1620 00 KAIG3-RFI-SW-C-1620-00
KAIG3-RFI-SW-C-1619 00 KAIG3-RFI-SW-C-1619-00
KAIG3-RFI-SW-C-1618 00 KAIG3-RFI-SW-C-1618-00
KAIG3-RFI-SW-C-1617 00 KAIG3-RFI-SW-C-1617-00
KAIG3-RFI-SW-C-1616 00 KAIG3-RFI-SW-C-1616-00
KAIG3-RFI-CO-S-5508 00 KAIG3-RFI-CO-S-5508-00
KAIG3-RFI-CO-S-5507 00 KAIG3-RFI-CO-S-5507-00
KAIG3-RFI-CO-S-5506 00 KAIG3-RFI-CO-S-5506-00
KAIG3-RFI-CO-S-5504 00 KAIG3-RFI-CO-S-5504-00
KAIG3-RFI-CO-S-5503 00 KAIG3-RFI-CO-S-5503-00
KAIG3-RFI-CO-S-5502 00 KAIG3-RFI-CO-S-5502-00
KAIG3-RFI-CO-S-5501 00 KAIG3-RFI-CO-S-5501-00
KAIG3-RFI-CO-S-5500 00 KAIG3-RFI-CO-S-5500-00
KAIG3-RFI-CO-SU-1943 00 KAIG3-RFI-CO-SU-1943-00
KAIG3-RFI-CO-SU-1942 00 KAIG3-RFI-CO-SU-1942-00
KAIG3-RFI-CO-SU-1941 00 KAIG3-RFI-CO-SU-1941-00
KAIG3-RFI-CO-C-1625 00 KAIG3-RFI-CO-C-1625-00
KAIG3-RFI-SW-C-1613 00 KAIG3-RFI-SW-C-1613-00
KAIG3-RFI-SW-C-1607 00 KAIG3-RFI-SW-C-1607-00
KAIG3-RFI-SW-C-1606 00 KAIG3-RFI-SW-C-1606-00
KAIG3-RFI-SW-C-1605 00 KAIG3-RFI-SW-C-1605-00
KAIG3-RFI-WG-C-1615 00 KAIG3-RFI-WG-C-1615-00
KAIG3-RFI-WG-C-1614 00 KAIG3-RFI-WG-C-1614-00
KAIG3-RFI-SW-C-1604 00 KAIG3-RFI-SW-C-1604-00
KAIG3-RFI-WG-C-1609 00 KAIG3-RFI-WG-C-1609-00
KAIG3-RFI-ZG-S-5494 00 KAIG3-RFI-ZG-S-5494-00
KAIG3-RFI-TG-S-5493 00 KAIG3-RFI-TG-S-5493-00
KAIG3-RFI-ZG-S-5492 00 KAIG3-RFI-ZG-S-5492-00
KAIG3-RFI-ZG-SU-1939 00 KAIG3-RFI-ZG-SU-1939-00
KAIG3-RFI-WG-P-1543 00 KAIG3-RFI-WG-P-1543-00
KAIG3-RFI-CO-C-1610 00 KAIG3-RFI-CO-C-1610-00
KAIG3-RFI-CO-SU-1940 00 KAIG3-RFI-CO-SU-1940-00
KAIG3-RFI-CO-SU-1938 00 KAIG3-RFI-CO-SU-1938-00
KAIG3-RFI-MC-S-5407 01 KAIG3-RFI-MC-S-5407-01
KAIG3-RFI-CO-S-5499 00 KAIG3-RFI-CO-S-5499-00
KAIG3-RFI-CO-S-5498 00 KAIG3-RFI-CO-S-5498-00
KAIG3-RFI-CO-S-5497 00 KAIG3-RFI-CO-S-5497-00
KAIG3-RFI-CO-S-5496 00 KAIG3-RFI-CO-S-5496-00
KAIG3-RFI-CO-S-5491 00 KAIG3-RFI-CO-S-5491-00
KAIG3-RFI-CO-S-5490 00 KAIG3-RFI-CO-S-5490-00
KAIG3-RFI-CO-C-1612 00 KAIG3-RFI-CO-C-1612-00
KAIG3-RFI-PG-SS-0014 00 KAIG3-RFI-PG-SS-0014-00
KAIG3-RFI-WG-LS-0670 00 KAIG3-RFI-WG-LS-0670-00
KAIG3-RFI-WG-S-5489 00 KAIG3-RFI-WG-S-5489-00
KAIG3-RFI-AG-S-5488 00 KAIG3-RFI-AG-S-5488-00
KAIG3-RFI-WG-C-1608 00 KAIG3-RFI-WG-C-1608-00
KAIG3-RFI-PG-S-5486 00 KAIG3-RFI-PG-S-5486-00
KAIG3-RFI-PG-SU-1937 00 KAIG3-RFI-PG-SU-1937-00
KAIG3-RFI-WG-LS-0668 00 KAIG3-RFI-WG-LS-0668-00
KAIG3-RFI-SW-A-0668 00 KAIG3-RFI-SW-A-0668-00
KAIG3-RFI-SW-A-0667 00 KAIG3-RFI-SW-A-0667-00
KAIG3-RFI-SW-C-1603 00 KAIG3-RFI-SW-C-1603-00
KAIG3-RFI-SW-LS-0669 00 KAIG3-RFI-SW-LS-0669-00
KAIG3-RFI-CO-P-0155 00 KAIG3-RFI-CO-P-0155-00
KAIG3-RFI-CO-S-5485 00 KAIG3-RFI-CO-S-5485-00
KAIG3-RFI-CO-S-5484 00 KAIG3-RFI-CO-S-5484-00
KAIG3-RFI-CO-S-5483 00 KAIG3-RFI-CO-S-5483-00
KAIG3-RFI-CO-S-5482 00 KAIG3-RFI-CO-S-5482-00
KAIG3-RFI-CO-S-5481 00 KAIG3-RFI-CO-S-5481-00
KAIG3-RFI-CO-S-5480 00 KAIG3-RFI-CO-S-5480-00
KAIG3-RFI-CO-S-5479 00 KAIG3-RFI-CO-S-5479-00
KAIG3-RFI-CO-SU-1936 00 KAIG3-RFI-CO-SU-1936-00
KAIG3-RFI-CO-SU-1935 00 KAIG3-RFI-CO-SU-1935-00
KAIG3-RFI-CO-SU-1934 00 KAIG3-RFI-CO-SU-1934-00
KAIG3-RFI-CO-SU-1933 00 KAIG3-RFI-CO-SU-1933-00
KAIG3-RFI-CO-S-5478 00 KAIG3-RFI-CO-S-5478-00
KAIG3-RFI-CO-S-5477 00 KAIG3-RFI-CO-S-5477-00
KAIG3-RFI-CO-S-5476 00 KAIG3-RFI-CO-S-5476-00
KAIG3-RFI-SW-LS-0667 00 KAIG3-RFI-SW-LS-0667-00
KAIG3-RFI-SW-LS-0666 00 KAIG3-RFI-SW-LS-0666-00
KAIG3-RFI-SW-C-1602 00 KAIG3-RFI-SW-C-1602-00
KAIG3-RFI-SW-C-1601 00 KAIG3-RFI-SW-C-1601-00
KAIG3-RFI-SW-C-1596 00 KAIG3-RFI-SW-C-1596-00
KAIG3-RFI-SW-C-1509 01 KAIG3-RFI-SW-C-1509-01
KAIG3-RFI-PA-C-1196 01 KAIG3-RFI-PA-C-1196-01
KAIG3-RFI-MB-LC-0302 01 KAIG3-RFI-MB-LC-0302-01
KAIG3-RFI-MB-E-0312 00 KAIG3-RFI-MB-E-0312-00
KAIG3-RFI-WG-LS-0665 00 KAIG3-RFI-WG-LS-0665-00
KAIG3-RFI-AG-S-5473 00 KAIG3-RFI-AG-S-5473-00
KAIG3-RFI-AG-S-5361 02 KAIG3-RFI-AG-S-5361-02
KAIG3-RFI-PG-S-5472 00 KAIG3-RFI-PG-S-5472-00
KAIG3-RFI-PG-S-5471 00 KAIG3-RFI-PG-S-5471-00
KAIG3-RFI-CO-SU-1932 00 KAIG3-RFI-CO-SU-1932-00
KAIG3-RFI-CO-SU-1931 00 KAIG3-RFI-CO-SU-1931-00
KAIG3-RFI-CO-S-5475 00 KAIG3-RFI-CO-S-5475-00
KAIG3-RFI-CO-S-5474 00 KAIG3-RFI-CO-S-5474-00
KAIG3-RFI-CO-S-5470 00 KAIG3-RFI-CO-S-5470-00
KAIG3-RFI-CO-S-5465 00 KAIG3-RFI-CO-S-5465-00
KAIG3-RFI-CO-C-1600 00 KAIG3-RFI-CO-C-1600-00
KAIG3-RFI-CO-C-1599 00 KAIG3-RFI-CO-C-1599-00
KAIG3-RFI-CO-C-1597 00 KAIG3-RFI-CO-C-1597-00
KAIG3-RFI-CO-C-1578 00 KAIG3-RFI-CO-C-1578-00
KAIG3-RFI-SW-C-1595 00 KAIG3-RFI-SW-C-1595-00
KAIG3-RFI-SW-C-1594 00 KAIG3-RFI-SW-C-1594-00
KAIG3-RFI-SW-C-1593 00 KAIG3-RFI-SW-C-1593-00
KAIG3-RFI-SW-C-1592 00 KAIG3-RFI-SW-C-1592-00
KAIG3-RFI-SW-C-1591 00 KAIG3-RFI-SW-C-1591-00
KAIG3-RFI-SW-C-1590 00 KAIG3-RFI-SW-C-1590-00
KAIG3-RFI-SW-C-1589 00 KAIG3-RFI-SW-C-1589-00
KAIG3-RFI-SW-C-1588 00 KAIG3-RFI-SW-C-1588-00
KAIG3-RFI-SW-C-1587 00 KAIG3-RFI-SW-C-1587-00
KAIG3-RFI-SW-C-1586 00 KAIG3-RFI-SW-C-1586-00
KAIG3-RFI-SW-C-1575 00 KAIG3-RFI-SW-C-1575-00
KAIG3-RFI-SW-C-1574 00 KAIG3-RFI-SW-C-1574-00
KAIG3-RFI-SW-LS-0664 00 KAIG3-RFI-SW-LS-0664-00
KAIG3-RFI-SW-C-1492 01 KAIG3-RFI-SW-C-1492-01
KAIG3-RFI-SW-C-1585 00 KAIG3-RFI-SW-C-1585-00
KAIG3-RFI-SW-C-1572 00 KAIG3-RFI-SW-C-1572-00
KAIG3-RFI-SW-LS-0663 00 KAIG3-RFI-SW-LS-0663-00
KAIG3-RFI-SW-LS-0662 00 KAIG3-RFI-SW-LS-0662-00
KAIG3-RFI-SW-C-1584 00 KAIG3-RFI-SW-C-1584-00
KAIG3-RFI-SW-C-1583 00 KAIG3-RFI-SW-C-1583-00
KAIG3-RFI-SW-C-1582 00 KAIG3-RFI-SW-C-1582-00
KAIG3-RFI-SW-C-1581 00 KAIG3-RFI-SW-C-1581-00
KAIG3-RFI-SW-C-1580 00 KAIG3-RFI-SW-C-1580-00
KAIG3-RFI-MB-A-0666 00 KAIG3-RFI-MB-A-0666-00
KAIG3-RFI-SW-C-1573 00 KAIG3-RFI-SW-C-1573-00
KAIG3-RFI-WG-S-5469 00 KAIG3-RFI-WG-S-5469-00
KAIG3-RFI-SW-C-1571 00 KAIG3-RFI-SW-C-1571-00
KAIG3-RFI-TG-SU-1930 00 KAIG3-RFI-TG-SU-1930-00
KAIG3-RFI-TG-C-1577 00 KAIG3-RFI-TG-C-1577-00
KAIG3-RFI-TG-S-5468 00 KAIG3-RFI-TG-S-5468-00
KAIG3-RFI-WG-S-5467 00 KAIG3-RFI-WG-S-5467-00
KAIG3-RFI-SG-S-5466 00 KAIG3-RFI-SG-S-5466-00
KAIG3-RFI-CO-SS-0011 01 KAIG3-RFI-CO-SS-0011-01
KAIG3-RFI-CO-SS-0012 01 KAIG3-RFI-CO-SS-0012-01
KAIG3-RFI-CO-C-1579 00 KAIG3-RFI-CO-C-1579-00
KAIG3-RFI-CO-S-5416 01 KAIG3-RFI-CO-S-5416-01
KAIG3-RFI-CO-S-5115 03 KAIG3-RFI-CO-S-5115-03
KAIG3-RFI-CO-S-5408 01 KAIG3-RFI-CO-S-5408-01
KAIG3-RFI-CO-S-5313 02 KAIG3-RFI-CO-S-5313-02
KAIG3-RFI-CO-S-5388 01 KAIG3-RFI-CO-S-5388-01
KAIG3-RFI-CO-S-5464 00 KAIG3-RFI-CO-S-5464-00
KAIG3-RFI-CO-S-5463 00 KAIG3-RFI-CO-S-5463-00
KAIG3-RFI-CO-SU-1929 00 KAIG3-RFI-CO-SU-1929-00
KAIG3-RFI-CO-SU-1910 01 KAIG3-RFI-CO-SU-1910-01
KAIG3-RFI-SW-LS-0660 00 KAIG3-RFI-SW-LS-0660-00
KAIG3-RFI-SW-LS-0659 00 KAIG3-RFI-SW-LS-0659-00
KAIG3-RFI-SW-LS-0658 00 KAIG3-RFI-SW-LS-0658-00
KAIG3-RFI-SW-LS-0657 00 KAIG3-RFI-SW-LS-0657-00
KAIG3-RFI-SW-LS-0656 00 KAIG3-RFI-SW-LS-0656-00
KAIG3-RFI-SW-LS-0655 00 KAIG3-RFI-SW-LS-0655-00
KAIG3-RFI-SW-C-1565 00 KAIG3-RFI-SW-C-1565-00
KAIG3-RFI-SW-C-1564 00 KAIG3-RFI-SW-C-1564-00
KAIG3-RFI-SW-C-1563 00 KAIG3-RFI-SW-C-1563-00
KAIG3-RFI-SW-C-1562 00 KAIG3-RFI-SW-C-1562-00
KAIG3-RFI-SW-C-1561 00 KAIG3-RFI-SW-C-1561-00
KAIG3-RFI-SW-C-1560 00 KAIG3-RFI-SW-C-1560-00
KAIG3-RFI-SW-C-1559 00 KAIG3-RFI-SW-C-1559-00
KAIG3-RFI-SW-C-1451 01 KAIG3-RFI-SW-C-1451-01
KAIG3-RFI-SW-C-1450 01 KAIG3-RFI-SW-C-1450-01
KAIG3-RFI-SW-C-1432 01 KAIG3-RFI-SW-C-1432-01
KAIG3-RFI-SW-C-1412 01 KAIG3-RFI-SW-C-1412-01
KAIG3-RFI-SW-C-1400 01 KAIG3-RFI-SW-C-1400-01
KAIG3-RFI-WG-C-1576 00 KAIG3-RFI-WG-C-1576-00
KAIG3-RFI-WG-LS-0661 00 KAIG3-RFI-WG-LS-0661-00
KAIG3-RFI-GN-A-0665 00 KAIG3-RFI-GN-A-0665-00
KAIG3-RFI-WG-C-1554 00 KAIG3-RFI-WG-C-1554-00
KAIG3-RFI-ZG-S-5460 00 KAIG3-RFI-ZG-S-5460-00
KAIG3-RFI-ZG-SU-1927 00 KAIG3-RFI-ZG-SU-1927-00
KAIG3-RFI-PG-S-5459 00 KAIG3-RFI-PG-S-5459-00
KAIG3-RFI-WG-LS-0652 00 KAIG3-RFI-WG-LS-0652-00
KAIG3-RFI-SG-S-5441 00 KAIG3-RFI-SG-S-5441-00
KAIG3-RFI-PG-S-5440 00 KAIG3-RFI-PG-S-5440-00
KAIG3-RFI-PG-S-5439 00 KAIG3-RFI-PG-S-5439-00
KAIG3-RFI-PG-S-5438 00 KAIG3-RFI-PG-S-5438-00
KAIG3-RFI-PG-S-5437 00 KAIG3-RFI-PG-S-5437-00
KAIG3-RFI-ZG-S-5434 00 KAIG3-RFI-ZG-S-5434-00
KAIG3-RFI-AG-SU-1921 00 KAIG3-RFI-AG-SU-1921-00
KAIG3-RFI-AG-SS-0013 00 KAIG3-RFI-AG-SS-0013-00
KAIG3-RFI-AG-S-5159 02 KAIG3-RFI-AG-S-5159-02
KAIG3-RFI-CO-SU-1928 00 KAIG3-RFI-CO-SU-1928-00
KAIG3-RFI-CO-SU-1926 00 KAIG3-RFI-CO-SU-1926-00
KAIG3-RFI-CO-SU-1905 01 KAIG3-RFI-CO-SU-1905-01
KAIG3-RFI-CO-SU-1904 01 KAIG3-RFI-CO-SU-1904-01
KAIG3-RFI-CO-S-5462 00 KAIG3-RFI-CO-S-5462-00
KAIG3-RFI-CO-S-5461 00 KAIG3-RFI-CO-S-5461-00
KAIG3-RFI-CO-S-5458 00 KAIG3-RFI-CO-S-5458-00
KAIG3-RFI-CO-S-5457 00 KAIG3-RFI-CO-S-5457-00
KAIG3-RFI-CO-S-5456 00 KAIG3-RFI-CO-S-5456-00
KAIG3-RFI-CO-S-5455 00 KAIG3-RFI-CO-S-5455-00
KAIG3-RFI-CO-S-5454 00 KAIG3-RFI-CO-S-5454-00
KAIG3-RFI-CO-S-5453 00 KAIG3-RFI-CO-S-5453-00
KAIG3-RFI-CO-S-5452 00 KAIG3-RFI-CO-S-5452-00
KAIG3-RFI-MB-LC-0312 00 KAIG3-RFI-MB-LC-0312-00
KAIG3-RFI-CO-S-5451 00 KAIG3-RFI-CO-S-5451-00
KAIG3-RFI-CO-S-5389 01 KAIG3-RFI-CO-S-5389-01
KAIG3-RFI-CO-C-1570 00 KAIG3-RFI-CO-C-1570-00
KAIG3-RFI-CO-C-1569 00 KAIG3-RFI-CO-C-1569-00
KAIG3-RFI-CO-C-1568 00 KAIG3-RFI-CO-C-1568-00
KAIG3-RFI-CO-C-1567 00 KAIG3-RFI-CO-C-1567-00
KAIG3-RFI-CO-C-1566 00 KAIG3-RFI-CO-C-1566-00
KAIG3-RFI-MB-LC-0311 00 KAIG3-RFI-MB-LC-0311-00
KAIG3-RFI-MB-LC-0310 00 KAIG3-RFI-MB-LC-0310-00
KAIG3-RFI-SW-LS-0654 00 KAIG3-RFI-SW-LS-0654-00
KAIG3-RFI-SW-LS-0653 00 KAIG3-RFI-SW-LS-0653-00
KAIG3-RFI-SW-LS-0651 00 KAIG3-RFI-SW-LS-0651-00
KAIG3-RFI-SW-LS-0557 01 KAIG3-RFI-SW-LS-0557-01
KAIG3-RFI-SW-LS-0469 01 KAIG3-RFI-SW-LS-0469-01
KAIG3-RFI-SW-LS-0463 02 KAIG3-RFI-SW-LS-0463-02
KAIG3-RFI-SW-LS-0453 02 KAIG3-RFI-SW-LS-0453-02
KAIG3-RFI-SW-LS-0420 01 KAIG3-RFI-SW-LS-0420-01
KAIG3-RFI-SW-C-1558 00 KAIG3-RFI-SW-C-1558-00
KAIG3-RFI-SW-C-1557 00 KAIG3-RFI-SW-C-1557-00
KAIG3-RFI-SW-C-1550 00 KAIG3-RFI-SW-C-1550-00
KAIG3-RFI-SW-C-1549 00 KAIG3-RFI-SW-C-1549-00
KAIG3-RFI-SW-C-1548 00 KAIG3-RFI-SW-C-1548-00
KAIG3-RFI-SW-C-1547 00 KAIG3-RFI-SW-C-1547-00
KAIG3-RFI-SW-C-1546 00 KAIG3-RFI-SW-C-1546-00
KAIG3-RFI-SW-C-1545 00 KAIG3-RFI-SW-C-1545-00
KAIG3-RFI-SW-C-1544 00 KAIG3-RFI-SW-C-1544-00
KAIG3-RFI-SW-C-1543 00 KAIG3-RFI-SW-C-1543-00
KAIG3-RFI-SW-C-1542 00 KAIG3-RFI-SW-C-1542-00
KAIG3-RFI-SW-C-1541 00 KAIG3-RFI-SW-C-1541-00
KAIG3-RFI-SW-C-1488 00 KAIG3-RFI-SW-C-1488-00
KAIG3-RFI-SW-C-1447 01 KAIG3-RFI-SW-C-1447-01
KAIG3-RFI-SW-C-1405 01 KAIG3-RFI-SW-C-1405-01
KAIG3-RFI-SW-C-1404 01 KAIG3-RFI-SW-C-1404-01
KAIG3-RFI-CO-SU-1925 00 KAIG3-RFI-CO-SU-1925-00
KAIG3-RFI-CO-SU-1924 00 KAIG3-RFI-CO-SU-1924-00
KAIG3-RFI-CO-SU-1923 00 KAIG3-RFI-CO-SU-1923-00
KAIG3-RFI-CO-S-5450 00 KAIG3-RFI-CO-S-5450-00
KAIG3-RFI-CO-S-5449 00 KAIG3-RFI-CO-S-5449-00
KAIG3-RFI-CO-S-5448 00 KAIG3-RFI-CO-S-5448-00
KAIG3-RFI-CO-S-5447 00 KAIG3-RFI-CO-S-5447-00
KAIG3-RFI-CO-S-5446 00 KAIG3-RFI-CO-S-5446-00
KAIG3-RFI-CO-S-5445 00 KAIG3-RFI-CO-S-5445-00
KAIG3-RFI-CO-S-5444 00 KAIG3-RFI-CO-S-5444-00
KAIG3-RFI-CO-S-5443 00 KAIG3-RFI-CO-S-5443-00
KAIG3-RFI-CO-S-5442 00 KAIG3-RFI-CO-S-5442-00
KAIG3-RFI-WG-P-1542 00 KAIG3-RFI-WG-P-1542-00
KAIG3-RFI-WG-P-1541 00 KAIG3-RFI-WG-P-1541-00
KAIG3-RFI-CO-S-5341 01 KAIG3-RFI-CO-S-5341-01
KAIG3-RFI-CO-SU-1922 00 KAIG3-RFI-CO-SU-1922-00
KAIG3-RFI-CO-S-5436 00 KAIG3-RFI-CO-S-5436-00
KAIG3-RFI-CO-S-5435 00 KAIG3-RFI-CO-S-5435-00
KAIG3-RFI-CO-SU-1920 00 KAIG3-RFI-CO-SU-1920-00
KAIG3-RFI-CO-S-5433 00 KAIG3-RFI-CO-S-5433-00
KAIG3-RFI-CO-S-5432 00 KAIG3-RFI-CO-S-5432-00
KAIG3-RFI-CO-S-5429 00 KAIG3-RFI-CO-S-5429-00
KAIG3-RFI-CO-S-5428 00 KAIG3-RFI-CO-S-5428-00
KAIG3-RFI-CO-S-5315 01 KAIG3-RFI-CO-S-5315-01
KAIG3-RFI-CO-S-5314 01 KAIG3-RFI-CO-S-5314-01
KAIG3-RFI-CO-C-1556 00 KAIG3-RFI-CO-C-1556-00
KAIG3-RFI-CO-C-1555 00 KAIG3-RFI-CO-C-1555-00
KAIG3-RFI-SW-LS-0650 00 KAIG3-RFI-SW-LS-0650-00
KAIG3-RFI-SW-LS-0649 00 KAIG3-RFI-SW-LS-0649-00
KAIG3-RFI-SW-LS-0648 00 KAIG3-RFI-SW-LS-0648-00
KAIG3-RFI-SW-LS-0647 00 KAIG3-RFI-SW-LS-0647-00
KAIG3-RFI-SW-LS-0646 00 KAIG3-RFI-SW-LS-0646-00
KAIG3-RFI-SW-LS-0645 00 KAIG3-RFI-SW-LS-0645-00
KAIG3-RFI-WG-C-1553 00 KAIG3-RFI-WG-C-1553-00
KAIG3-RFI-WG-C-1552 00 KAIG3-RFI-WG-C-1552-00
KAIG3-RFI-DG-S-5431 00 KAIG3-RFI-DG-S-5431-00
KAIG3-RFI-DG-C-1551 00 KAIG3-RFI-DG-C-1551-00
KAIG3-RFI-AG-S-5361 01 KAIG3-RFI-AG-S-5361-01
KAIG3-RFI-SW-C-1540 00 KAIG3-RFI-SW-C-1540-00
KAIG3-RFI-SW-C-1539 00 KAIG3-RFI-SW-C-1539-00
KAIG3-RFI-SW-C-1538 00 KAIG3-RFI-SW-C-1538-00
KAIG3-RFI-SW-C-1537 00 KAIG3-RFI-SW-C-1537-00
KAIG3-RFI-SW-C-1536 00 KAIG3-RFI-SW-C-1536-00
KAIG3-RFI-SW-C-1535 00 KAIG3-RFI-SW-C-1535-00
KAIG3-RFI-SW-C-1534 00 KAIG3-RFI-SW-C-1534-00
KAIG3-RFI-SW-C-1533 00 KAIG3-RFI-SW-C-1533-00
KAIG3-RFI-WG-C-1531 00 KAIG3-RFI-WG-C-1531-00
KAIG3-RFI-MB-A-0664 00 KAIG3-RFI-MB-A-0664-00
KAIG3-RFI-MB-A-0663 00 KAIG3-RFI-MB-A-0663-00
KAIG3-RFI-MB-A-0662 00 KAIG3-RFI-MB-A-0662-00
KAIG3-RFI-PG-S-5424 00 KAIG3-RFI-PG-S-5424-00
KAIG3-RFI-ZG-S-5423 00 KAIG3-RFI-ZG-S-5423-00
KAIG3-RFI-WG-LS-0643 00 KAIG3-RFI-WG-LS-0643-00
KAIG3-RFI-WG-LS-0642 00 KAIG3-RFI-WG-LS-0642-00
KAIG3-RFI-WG-LS-0641 00 KAIG3-RFI-WG-LS-0641-00
KAIG3-RFI-WG-LS-0644 00 KAIG3-RFI-WG-LS-0644-00
KAIG3-RFI-SW-A-0640 01 KAIG3-RFI-SW-A-0640-01
KAIG3-RFI-SW-LS-0640 00 KAIG3-RFI-SW-LS-0640-00
KAIG3-RFI-SW-LS-0639 00 KAIG3-RFI-SW-LS-0639-00
KAIG3-RFI-SW-LS-0638 00 KAIG3-RFI-SW-LS-0638-00
KAIG3-RFI-SW-LS-0637 00 KAIG3-RFI-SW-LS-0637-00
KAIG3-RFI-SW-LS-0636 00 KAIG3-RFI-SW-LS-0636-00
KAIG3-RFI-SW-LS-0635 00 KAIG3-RFI-SW-LS-0635-00
KAIG3-RFI-SW-LS-0634 00 KAIG3-RFI-SW-LS-0634-00
KAIG3-RFI-SW-C-1525 00 KAIG3-RFI-SW-C-1525-00
KAIG3-RFI-PA-C-1524 00 KAIG3-RFI-PA-C-1524-00
KAIG3-RFI-PA-C-1523 00 KAIG3-RFI-PA-C-1523-00
KAIG3-RFI-PA-C-1522 00 KAIG3-RFI-PA-C-1522-00
KAIG3-RFI-PA-C-1521 00 KAIG3-RFI-PA-C-1521-00
KAIG3-RFI-MC-S-5347 01 KAIG3-RFI-MC-S-5347-01
KAIG3-RFI-CO-SU-1919 00 KAIG3-RFI-CO-SU-1919-00
KAIG3-RFI-CO-SU-1918 00 KAIG3-RFI-CO-SU-1918-00
KAIG3-RFI-CO-SU-1917 00 KAIG3-RFI-CO-SU-1917-00
KAIG3-RFI-CO-S-5427 00 KAIG3-RFI-CO-S-5427-00
KAIG3-RFI-CO-S-5426 00 KAIG3-RFI-CO-S-5426-00
KAIG3-RFI-PA-C-1520 00 KAIG3-RFI-PA-C-1520-00
KAIG3-RFI-CO-S-5425 00 KAIG3-RFI-CO-S-5425-00
KAIG3-RFI-SW-C-1519 00 KAIG3-RFI-SW-C-1519-00
KAIG3-RFI-CO-S-5422 00 KAIG3-RFI-CO-S-5422-00
KAIG3-RFI-SW-C-1518 00 KAIG3-RFI-SW-C-1518-00
KAIG3-RFI-CO-S-5421 00 KAIG3-RFI-CO-S-5421-00
KAIG3-RFI-SW-C-1517 00 KAIG3-RFI-SW-C-1517-00
KAIG3-RFI-CO-S-5420 00 KAIG3-RFI-CO-S-5420-00
KAIG3-RFI-CO-S-5419 00 KAIG3-RFI-CO-S-5419-00
KAIG3-RFI-CO-S-5418 00 KAIG3-RFI-CO-S-5418-00
KAIG3-RFI-CO-C-1532 00 KAIG3-RFI-CO-C-1532-00
KAIG3-RFI-CO-C-1530 00 KAIG3-RFI-CO-C-1530-00
KAIG3-RFI-CO-C-1529 00 KAIG3-RFI-CO-C-1529-00
KAIG3-RFI-CO-C-1528 00 KAIG3-RFI-CO-C-1528-00
KAIG3-RFI-CO-C-1527 00 KAIG3-RFI-CO-C-1527-00
KAIG3-RFI-CO-C-1526 00 KAIG3-RFI-CO-C-1526-00
KAIG3-RFI-ZG-LC-0306 00 KAIG3-RFI-ZG-LC-0306-00
KAIG3-RFI-PC-E-0311 00 KAIG3-RFI-PC-E-0311-00
KAIG3-RFI-ZG-E-0309 00 KAIG3-RFI-ZG-E-0309-00
KAIG3-RFI-SW-LS-0633 00 KAIG3-RFI-SW-LS-0633-00
KAIG3-RFI-SW-LS-0632 00 KAIG3-RFI-SW-LS-0632-00
KAIG3-RFI-SW-LS-0631 00 KAIG3-RFI-SW-LS-0631-00
KAIG3-RFI-SW-LS-0630 00 KAIG3-RFI-SW-LS-0630-00
KAIG3-RFI-SW-C-1516 00 KAIG3-RFI-SW-C-1516-00
KAIG3-RFI-SW-C-1515 00 KAIG3-RFI-SW-C-1515-00
KAIG3-RFI-SW-C-1514 00 KAIG3-RFI-SW-C-1514-00
KAIG3-RFI-SW-C-1513 00 KAIG3-RFI-SW-C-1513-00
KAIG3-RFI-SW-C-1512 00 KAIG3-RFI-SW-C-1512-00
KAIG3-RFI-SW-C-1511 00 KAIG3-RFI-SW-C-1511-00
KAIG3-RFI-SW-C-1510 00 KAIG3-RFI-SW-C-1510-00
KAIG3-RFI-SW-C-1509 00 KAIG3-RFI-SW-C-1509-00
KAIG3-RFI-PG-S-5404 00 KAIG3-RFI-PG-S-5404-00
KAIG3-RFI-ZG-SU-1912 00 KAIG3-RFI-ZG-SU-1912-00
KAIG3-RFI-ZG-S-5403 00 KAIG3-RFI-ZG-S-5403-00
KAIG3-RFI-ZG-LC-0309 00 KAIG3-RFI-ZG-LC-0309-00
KAIG3-RFI-ZG-LC-0308 00 KAIG3-RFI-ZG-LC-0308-00
KAIG3-RFI-CO-SU-1916 00 KAIG3-RFI-CO-SU-1916-00
KAIG3-RFI-CO-SU-1915 00 KAIG3-RFI-CO-SU-1915-00
KAIG3-RFI-CO-SU-1914 00 KAIG3-RFI-CO-SU-1914-00
KAIG3-RFI-MC-SU-1913 00 KAIG3-RFI-MC-SU-1913-00
KAIG3-RFI-MC-S-5407 00 KAIG3-RFI-MC-S-5407-00
KAIG3-RFI-MC-S-5406 00 KAIG3-RFI-MC-S-5406-00
KAIG3-RFI-MC-S-5405 00 KAIG3-RFI-MC-S-5405-00
KAIG3-RFI-CO-S-5417 00 KAIG3-RFI-CO-S-5417-00
KAIG3-RFI-CO-S-5416 00 KAIG3-RFI-CO-S-5416-00
KAIG3-RFI-CO-S-5415 00 KAIG3-RFI-CO-S-5415-00
KAIG3-RFI-CO-S-5414 00 KAIG3-RFI-CO-S-5414-00
KAIG3-RFI-CO-S-5413 00 KAIG3-RFI-CO-S-5413-00
KAIG3-RFI-CO-S-5412 00 KAIG3-RFI-CO-S-5412-00
KAIG3-RFI-CO-S-5411 00 KAIG3-RFI-CO-S-5411-00
KAIG3-RFI-CO-S-5410 00 KAIG3-RFI-CO-S-5410-00
KAIG3-RFI-CO-S-5409 00 KAIG3-RFI-CO-S-5409-00
KAIG3-RFI-CO-S-5408 00 KAIG3-RFI-CO-S-5408-00
KAIG3-RFI-ZG-LC-0307 00 KAIG3-RFI-ZG-LC-0307-00
KAIG3-RFI-PC-E-0310 00 KAIG3-RFI-PC-E-0310-00
KAIG3-RFI-WG-C-1508 00 KAIG3-RFI-WG-C-1508-00
KAIG3-RFI-ZG-S-5391 00 KAIG3-RFI-ZG-S-5391-00
KAIG3-RFI-ZG-SU-1907 00 KAIG3-RFI-ZG-SU-1907-00
KAIG3-RFI-DG-S-5390 00 KAIG3-RFI-DG-S-5390-00
KAIG3-RFI-WG-C-1506 00 KAIG3-RFI-WG-C-1506-00
KAIG3-RFI-WG-C-1505 00 KAIG3-RFI-WG-C-1505-00
KAIG3-RFI-WG-C-1504 00 KAIG3-RFI-WG-C-1504-00
KAIG3-RFI-WG-C-1503 00 KAIG3-RFI-WG-C-1503-00
KAIG3-RFI-CO-S-5343 01 KAIG3-RFI-CO-S-5343-01
KAIG3-RFI-CO-S-5334 01 KAIG3-RFI-CO-S-5334-01
KAIG3-RFI-CO-S-5276 02 KAIG3-RFI-CO-S-5276-02
KAIG3-RFI-CO-S-5275 02 KAIG3-RFI-CO-S-5275-02
KAIG3-RFI-CO-S-5274 02 KAIG3-RFI-CO-S-5274-02
KAIG3-RFI-MC-SU-1911 00 KAIG3-RFI-MC-SU-1911-00
KAIG3-RFI-MC-S-5402 00 KAIG3-RFI-MC-S-5402-00
KAIG3-RFI-MC-S-5401 00 KAIG3-RFI-MC-S-5401-00
KAIG3-RFI-MC-S-5400 00 KAIG3-RFI-MC-S-5400-00
KAIG3-RFI-WG-P-1408 01 KAIG3-RFI-WG-P-1408-01
KAIG3-RFI-WG-P-1477 00 KAIG3-RFI-WG-P-1477-00
KAIG3-RFI-PC-LC-0305 00 KAIG3-RFI-PC-LC-0305-00
KAIG3-RFI-PC-LC-0304 00 KAIG3-RFI-PC-LC-0304-00
KAIG3-RFI-PC-LC-0303 00 KAIG3-RFI-PC-LC-0303-00
KAIG3-RFI-MB-LC-0302 00 KAIG3-RFI-MB-LC-0302-00
KAIG3-RFI-SW-LS-0629 00 KAIG3-RFI-SW-LS-0629-00
KAIG3-RFI-SW-LS-0628 00 KAIG3-RFI-SW-LS-0628-00
KAIG3-RFI-SW-LS-0626 00 KAIG3-RFI-SW-LS-0626-00
KAIG3-RFI-SW-C-1507 00 KAIG3-RFI-SW-C-1507-00
KAIG3-RFI-SW-C-1502 00 KAIG3-RFI-SW-C-1502-00
KAIG3-RFI-SW-C-1501 00 KAIG3-RFI-SW-C-1501-00
KAIG3-RFI-SW-C-1500 00 KAIG3-RFI-SW-C-1500-00
KAIG3-RFI-SW-C-1499 00 KAIG3-RFI-SW-C-1499-00
KAIG3-RFI-SW-C-1498 00 KAIG3-RFI-SW-C-1498-00
KAIG3-RFI-SW-C-1497 00 KAIG3-RFI-SW-C-1497-00
KAIG3-RFI-PG-S-5337 01 KAIG3-RFI-PG-S-5337-01
KAIG3-RFI-DG-SU-1906 00 KAIG3-RFI-DG-SU-1906-00
KAIG3-RFI-PG-A-0661 00 KAIG3-RFI-PG-A-0661-00
KAIG3-RFI-PG-S-5384 00 KAIG3-RFI-PG-S-5384-00
KAIG3-RFI-WG-LS-0625 00 KAIG3-RFI-WG-LS-0625-00
KAIG3-RFI-WG-LS-0623 00 KAIG3-RFI-WG-LS-0623-00
KAIG3-RFI-WG-LS-0622 00 KAIG3-RFI-WG-LS-0622-00
KAIG3-RFI-WG-SU-1504 03 KAIG3-RFI-WG-SU-1504-03
KAIG3-RFI-SW-LS-0627 00 KAIG3-RFI-SW-LS-0627-00
KAIG3-RFI-SW-C-1492 00 KAIG3-RFI-SW-C-1492-00
KAIG3-RFI-SW-C-1491 00 KAIG3-RFI-SW-C-1491-00
KAIG3-RFI-SW-C-1490 00 KAIG3-RFI-SW-C-1490-00
KAIG3-RFI-SW-C-1489 00 KAIG3-RFI-SW-C-1489-00
KAIG3-RFI-SW-C-1487 00 KAIG3-RFI-SW-C-1487-00
KAIG3-RFI-DG-LC-0301 00 KAIG3-RFI-DG-LC-0301-00
KAIG3-RFI-SW-C-1486 00 KAIG3-RFI-SW-C-1486-00
KAIG3-RFI-SW-C-1485 00 KAIG3-RFI-SW-C-1485-00
KAIG3-RFI-SW-C-1484 00 KAIG3-RFI-SW-C-1484-00
KAIG3-RFI-SW-C-1483 00 KAIG3-RFI-SW-C-1483-00
KAIG3-RFI-SW-C-1482 00 KAIG3-RFI-SW-C-1482-00
KAIG3-RFI-SW-C-1481 00 KAIG3-RFI-SW-C-1481-00
KAIG3-RFI-SW-C-1480 00 KAIG3-RFI-SW-C-1480-00
KAIG3-RFI-SW-C-1479 00 KAIG3-RFI-SW-C-1479-00
KAIG3-RFI-SW-C-1478 00 KAIG3-RFI-SW-C-1478-00
KAIG3-RFI-SW-C-1477 00 KAIG3-RFI-SW-C-1477-00
KAIG3-RFI-CO-SU-1910 00 KAIG3-RFI-CO-SU-1910-00
KAIG3-RFI-CO-SU-1909 00 KAIG3-RFI-CO-SU-1909-00
KAIG3-RFI-CO-SU-1908 00 KAIG3-RFI-CO-SU-1908-00
KAIG3-RFI-CO-SU-1905 00 KAIG3-RFI-CO-SU-1905-00
KAIG3-RFI-CO-SU-1904 00 KAIG3-RFI-CO-SU-1904-00
KAIG3-RFI-CO-S-5399 00 KAIG3-RFI-CO-S-5399-00
KAIG3-RFI-CO-S-5398 00 KAIG3-RFI-CO-S-5398-00
KAIG3-RFI-CO-S-5397 00 KAIG3-RFI-CO-S-5397-00
KAIG3-RFI-CO-S-5396 00 KAIG3-RFI-CO-S-5396-00
KAIG3-RFI-CO-S-5395 00 KAIG3-RFI-CO-S-5395-00
KAIG3-RFI-CO-S-5394 00 KAIG3-RFI-CO-S-5394-00
KAIG3-RFI-CO-S-5393 00 KAIG3-RFI-CO-S-5393-00
KAIG3-RFI-CO-S-5392 00 KAIG3-RFI-CO-S-5392-00
KAIG3-RFI-CO-S-5389 00 KAIG3-RFI-CO-S-5389-00
KAIG3-RFI-CO-S-5388 00 KAIG3-RFI-CO-S-5388-00
KAIG3-RFI-CO-S-5375 00 KAIG3-RFI-CO-S-5375-00
KAIG3-RFI-CO-S-5374 00 KAIG3-RFI-CO-S-5374-00
KAIG3-RFI-DG-LC-0300 00 KAIG3-RFI-DG-LC-0300-00
KAIG3-RFI-CO-S-5237 02 KAIG3-RFI-CO-S-5237-02
KAIG3-RFI-DG-LC-0299 00 KAIG3-RFI-DG-LC-0299-00
KAIG3-RFI-CO-SS-0012 00 KAIG3-RFI-CO-SS-0012-00
KAIG3-RFI-PC-LC-0298 00 KAIG3-RFI-PC-LC-0298-00
KAIG3-RFI-CO-SS-0011 00 KAIG3-RFI-CO-SS-0011-00
KAIG3-RFI-CO-C-1496 00 KAIG3-RFI-CO-C-1496-00
KAIG3-RFI-PC-LC-0297 00 KAIG3-RFI-PC-LC-0297-00
KAIG3-RFI-CO-C-1495 00 KAIG3-RFI-CO-C-1495-00
KAIG3-RFI-CO-C-1494 00 KAIG3-RFI-CO-C-1494-00
KAIG3-RFI-CO-C-1493 00 KAIG3-RFI-CO-C-1493-00
KAIG3-RFI-PC-E-0308 00 KAIG3-RFI-PC-E-0308-00
KAIG3-RFI-DG-E-0307 00 KAIG3-RFI-DG-E-0307-00
KAIG3-RFI-SW-C-1476 00 KAIG3-RFI-SW-C-1476-00
KAIG3-RFI-SW-C-1475 00 KAIG3-RFI-SW-C-1475-00
KAIG3-RFI-SW-C-1474 00 KAIG3-RFI-SW-C-1474-00
KAIG3-RFI-SW-C-1473 00 KAIG3-RFI-SW-C-1473-00
KAIG3-RFI-SW-C-1407 00 KAIG3-RFI-SW-C-1407-00
KAIG3-RFI-PC-LC-0296 00 KAIG3-RFI-PC-LC-0296-00
KAIG3-RFI-CO-SU-1903 00 KAIG3-RFI-CO-SU-1903-00
KAIG3-RFI-CO-SU-1901 00 KAIG3-RFI-CO-SU-1901-00
KAIG3-RFI-CO-S-5387 00 KAIG3-RFI-CO-S-5387-00
KAIG3-RFI-CO-S-5317 01 KAIG3-RFI-CO-S-5317-01
KAIG3-RFI-CO-S-5313 01 KAIG3-RFI-CO-S-5313-01
KAIG3-RFI-CO-C-1472 00 KAIG3-RFI-CO-C-1472-00
KAIG3-RFI-DG-A-0660 00 KAIG3-RFI-DG-A-0660-00
KAIG3-RFI-PG-S-5383 00 KAIG3-RFI-PG-S-5383-00
KAIG3-RFI-TG-S-5382 00 KAIG3-RFI-TG-S-5382-00
KAIG3-RFI-TG-S-5381 00 KAIG3-RFI-TG-S-5381-00
KAIG3-RFI-TG-S-5380 00 KAIG3-RFI-TG-S-5380-00
KAIG3-RFI-MB-A-0659 00 KAIG3-RFI-MB-A-0659-00
KAIG3-RFI-MB-A-0658 00 KAIG3-RFI-MB-A-0658-00
KAIG3-RFI-MB-S-5379 00 KAIG3-RFI-MB-S-5379-00
KAIG3-RFI-MB-S-5378 00 KAIG3-RFI-MB-S-5378-00
KAIG3-RFI-SW-LS-0624 00 KAIG3-RFI-SW-LS-0624-00
KAIG3-RFI-SW-LS-0622 00 KAIG3-RFI-SW-LS-0622-00
KAIG3-RFI-SW-C-1470 00 KAIG3-RFI-SW-C-1470-00
KAIG3-RFI-SW-C-1469 00 KAIG3-RFI-SW-C-1469-00
KAIG3-RFI-SW-C-1468 00 KAIG3-RFI-SW-C-1468-00
KAIG3-RFI-SW-C-1467 00 KAIG3-RFI-SW-C-1467-00
KAIG3-RFI-MB-M-0154 00 KAIG3-RFI-MB-M-0154-00
KAIG3-RFI-SW-C-1466 00 KAIG3-RFI-SW-C-1466-00
KAIG3-RFI-SW-C-1465 00 KAIG3-RFI-SW-C-1465-00
KAIG3-RFI-SW-C-1464 00 KAIG3-RFI-SW-C-1464-00
KAIG3-RFI-SW-C-1460 00 KAIG3-RFI-SW-C-1460-00
KAIG3-RFI-PG-E-0305 00 KAIG3-RFI-PG-E-0305-00
KAIG3-RFI-SW-C-1459 00 KAIG3-RFI-SW-C-1459-00
KAIG3-RFI-SW-C-1458 00 KAIG3-RFI-SW-C-1458-00
KAIG3-RFI-SW-C-1446 00 KAIG3-RFI-SW-C-1446-00
KAIG3-RFI-PC-LC-0295 00 KAIG3-RFI-PC-LC-0295-00
KAIG3-RFI-SW-C-1445 00 KAIG3-RFI-SW-C-1445-00
KAIG3-RFI-SW-C-0749 01 KAIG3-RFI-SW-C-0749-01
KAIG3-RFI-PG-LC-0294 00 KAIG3-RFI-PG-LC-0294-00
KAIG3-RFI-SW-C-0736 01 KAIG3-RFI-SW-C-0736-01
KAIG3-RFI-PG-LC-0293 00 KAIG3-RFI-PG-LC-0293-00
KAIG3-RFI-SW-C-0414 01 KAIG3-RFI-SW-C-0414-01
KAIG3-RFI-CO-C-1471 00 KAIG3-RFI-CO-C-1471-00
KAIG3-RFI-CO-C-1463 00 KAIG3-RFI-CO-C-1463-00
KAIG3-RFI-CO-C-1462 00 KAIG3-RFI-CO-C-1462-00
KAIG3-RFI-CO-C-1461 00 KAIG3-RFI-CO-C-1461-00
KAIG3-RFI-CO-S-5115 02 KAIG3-RFI-CO-S-5115-02
KAIG3-RFI-CO-SU-1902 00 KAIG3-RFI-CO-SU-1902-00
KAIG3-RFI-CO-S-5385 00 KAIG3-RFI-CO-S-5385-00
KAIG3-RFI-CO-S-5386 00 KAIG3-RFI-CO-S-5386-00
KAIG3-RFI-CO-A-0657 00 KAIG3-RFI-CO-A-0657-00
KAIG3-RFI-SW-LS-0621 00 KAIG3-RFI-SW-LS-0621-00
KAIG3-RFI-SW-LS-0201 02 KAIG3-RFI-SW-LS-0201-02
KAIG3-RFI-SW-C-1451 00 KAIG3-RFI-SW-C-1451-00
KAIG3-RFI-SW-C-1450 00 KAIG3-RFI-SW-C-1450-00
KAIG3-RFI-SW-C-1449 00 KAIG3-RFI-SW-C-1449-00
KAIG3-RFI-WG-C-1454 00 KAIG3-RFI-WG-C-1454-00
KAIG3-RFI-SW-C-1448 00 KAIG3-RFI-SW-C-1448-00
KAIG3-RFI-WG-C-1453 00 KAIG3-RFI-WG-C-1453-00
KAIG3-RFI-SW-C-1447 00 KAIG3-RFI-SW-C-1447-00
KAIG3-RFI-WG-C-1452 00 KAIG3-RFI-WG-C-1452-00
KAIG3-RFI-SW-C-1444 00 KAIG3-RFI-SW-C-1444-00
KAIG3-RFI-TG-S-5377 00 KAIG3-RFI-TG-S-5377-00
KAIG3-RFI-SW-C-1443 00 KAIG3-RFI-SW-C-1443-00
KAIG3-RFI-SW-C-1442 00 KAIG3-RFI-SW-C-1442-00
KAIG3-RFI-ZG-S-5376 00 KAIG3-RFI-ZG-S-5376-00
KAIG3-RFI-ZG-SU-1900 00 KAIG3-RFI-ZG-SU-1900-00
KAIG3-RFI-SG-A-0656 00 KAIG3-RFI-SG-A-0656-00
KAIG3-RFI-SW-C-1441 00 KAIG3-RFI-SW-C-1441-00
KAIG3-RFI-SW-C-1440 00 KAIG3-RFI-SW-C-1440-00
KAIG3-RFI-SW-C-1439 00 KAIG3-RFI-SW-C-1439-00
KAIG3-RFI-SW-C-1438 00 KAIG3-RFI-SW-C-1438-00
KAIG3-RFI-SW-C-1432 00 KAIG3-RFI-SW-C-1432-00
KAIG3-RFI-DG-A-0655 00 KAIG3-RFI-DG-A-0655-00
KAIG3-RFI-DG-A-0654 00 KAIG3-RFI-DG-A-0654-00
KAIG3-RFI-CO-C-1457 00 KAIG3-RFI-CO-C-1457-00
KAIG3-RFI-MB-S-5365 00 KAIG3-RFI-MB-S-5365-00
KAIG3-RFI-CO-C-1415 00 KAIG3-RFI-CO-C-1415-00
KAIG3-RFI-MB-S-5364 00 KAIG3-RFI-MB-S-5364-00
KAIG3-RFI-CO-C-1456 00 KAIG3-RFI-CO-C-1456-00
KAIG3-RFI-CO-C-1455 00 KAIG3-RFI-CO-C-1455-00
KAIG3-RFI-CO-S-5373 00 KAIG3-RFI-CO-S-5373-00
KAIG3-RFI-CO-S-5367 00 KAIG3-RFI-CO-S-5367-00
KAIG3-RFI-CO-SU-1899 00 KAIG3-RFI-CO-SU-1899-00
KAIG3-RFI-CO-S-5372 00 KAIG3-RFI-CO-S-5372-00
KAIG3-RFI-CO-S-5371 00 KAIG3-RFI-CO-S-5371-00
KAIG3-RFI-SW-C-1437 00 KAIG3-RFI-SW-C-1437-00
KAIG3-RFI-SW-C-1436 00 KAIG3-RFI-SW-C-1436-00
KAIG3-RFI-SW-C-1435 00 KAIG3-RFI-SW-C-1435-00
KAIG3-RFI-SW-C-1434 00 KAIG3-RFI-SW-C-1434-00
KAIG3-RFI-SW-C-1433 00 KAIG3-RFI-SW-C-1433-00
KAIG3-RFI-MB-A-0653 00 KAIG3-RFI-MB-A-0653-00
KAIG3-RFI-TG-S-5363 00 KAIG3-RFI-TG-S-5363-00
KAIG3-RFI-DG-S-5362 00 KAIG3-RFI-DG-S-5362-00
KAIG3-RFI-AG-S-5159 01 KAIG3-RFI-AG-S-5159-01
KAIG3-RFI-SW-LS-0620 00 KAIG3-RFI-SW-LS-0620-00
KAIG3-RFI-AG-S-5361 00 KAIG3-RFI-AG-S-5361-00
KAIG3-RFI-DG-S-5360 00 KAIG3-RFI-DG-S-5360-00
KAIG3-RFI-ZG-S-5359 00 KAIG3-RFI-ZG-S-5359-00
KAIG3-RFI-DG-SU-1889 00 KAIG3-RFI-DG-SU-1889-00
KAIG3-RFI-CO-SU-1898 00 KAIG3-RFI-CO-SU-1898-00
KAIG3-RFI-CO-SU-1897 00 KAIG3-RFI-CO-SU-1897-00
KAIG3-RFI-CO-SU-1896 00 KAIG3-RFI-CO-SU-1896-00
KAIG3-RFI-CO-SU-1895 00 KAIG3-RFI-CO-SU-1895-00
KAIG3-RFI-CO-SU-1894 00 KAIG3-RFI-CO-SU-1894-00
KAIG3-RFI-CO-SU-1893 00 KAIG3-RFI-CO-SU-1893-00
KAIG3-RFI-CO-S-5370 00 KAIG3-RFI-CO-S-5370-00
KAIG3-RFI-CO-S-5369 00 KAIG3-RFI-CO-S-5369-00
KAIG3-RFI-CO-S-5368 00 KAIG3-RFI-CO-S-5368-00
KAIG3-RFI-CO-S-5366 00 KAIG3-RFI-CO-S-5366-00
KAIG3-RFI-CO-S-5358 00 KAIG3-RFI-CO-S-5358-00
KAIG3-RFI-CO-S-5357 00 KAIG3-RFI-CO-S-5357-00
KAIG3-RFI-CO-S-5356 00 KAIG3-RFI-CO-S-5356-00
KAIG3-RFI-CO-S-5355 00 KAIG3-RFI-CO-S-5355-00
KAIG3-RFI-CO-S-5354 00 KAIG3-RFI-CO-S-5354-00
KAIG3-RFI-CO-S-5353 00 KAIG3-RFI-CO-S-5353-00
KAIG3-RFI-CO-S-5352 00 KAIG3-RFI-CO-S-5352-00
KAIG3-RFI-CO-S-5351 00 KAIG3-RFI-CO-S-5351-00
KAIG3-RFI-CO-S-5350 00 KAIG3-RFI-CO-S-5350-00
KAIG3-RFI-CO-S-5349 00 KAIG3-RFI-CO-S-5349-00
KAIG3-RFI-MB-LC-0271 01 KAIG3-RFI-MB-LC-0271-01
KAIG3-RFI-WG-P-1408 00 KAIG3-RFI-WG-P-1408-00
KAIG3-RFI-SW-LS-0619 00 KAIG3-RFI-SW-LS-0619-00
KAIG3-RFI-CO-SU-1892 00 KAIG3-RFI-CO-SU-1892-00
KAIG3-RFI-CO-SU-1891 00 KAIG3-RFI-CO-SU-1891-00
KAIG3-RFI-SW-C-1431 00 KAIG3-RFI-SW-C-1431-00
KAIG3-RFI-CO-C-1429 00 KAIG3-RFI-CO-C-1429-00
KAIG3-RFI-SW-C-1430 00 KAIG3-RFI-SW-C-1430-00
KAIG3-RFI-CO-C-1428 00 KAIG3-RFI-CO-C-1428-00
KAIG3-RFI-SW-C-1425 00 KAIG3-RFI-SW-C-1425-00
KAIG3-RFI-CO-C-1427 00 KAIG3-RFI-CO-C-1427-00
KAIG3-RFI-SW-C-1424 00 KAIG3-RFI-SW-C-1424-00
KAIG3-RFI-CO-C-1426 00 KAIG3-RFI-CO-C-1426-00
KAIG3-RFI-SW-C-1423 00 KAIG3-RFI-SW-C-1423-00
KAIG3-RFI-SW-C-1422 00 KAIG3-RFI-SW-C-1422-00
KAIG3-RFI-SW-C-1421 00 KAIG3-RFI-SW-C-1421-00
KAIG3-RFI-SW-C-1390 01 KAIG3-RFI-SW-C-1390-01
KAIG3-RFI-CO-C-1384 01 KAIG3-RFI-CO-C-1384-01
KAIG3-RFI-CO-S-5187 01 KAIG3-RFI-CO-S-5187-01
KAIG3-RFI-CO-S-5186 01 KAIG3-RFI-CO-S-5186-01
KAIG3-RFI-PG-S-5348 00 KAIG3-RFI-PG-S-5348-00
KAIG3-RFI-DG-A-0652 00 KAIG3-RFI-DG-A-0652-00
KAIG3-RFI-CO-S-5283 01 KAIG3-RFI-CO-S-5283-01
KAIG3-RFI-SG-S-5346 00 KAIG3-RFI-SG-S-5346-00
KAIG3-RFI-ZG-S-5336 00 KAIG3-RFI-ZG-S-5336-00
KAIG3-RFI-SW-S-5345 00 KAIG3-RFI-SW-S-5345-00
KAIG3-RFI-SW-C-1389 01 KAIG3-RFI-SW-C-1389-01
KAIG3-RFI-SW-S-5344 00 KAIG3-RFI-SW-S-5344-00
KAIG3-RFI-SW-C-1388 01 KAIG3-RFI-SW-C-1388-01
KAIG3-RFI-MC-S-5347 00 KAIG3-RFI-MC-S-5347-00
KAIG3-RFI-WG-C-1420 00 KAIG3-RFI-WG-C-1420-00
KAIG3-RFI-CO-S-5343 00 KAIG3-RFI-CO-S-5343-00
KAIG3-RFI-SW-C-1387 01 KAIG3-RFI-SW-C-1387-01
KAIG3-RFI-SW-C-1386 01 KAIG3-RFI-SW-C-1386-01
KAIG3-RFI-SW-C-1379 01 KAIG3-RFI-SW-C-1379-01
KAIG3-RFI-SW-C-0740 01 KAIG3-RFI-SW-C-0740-01
KAIG3-RFI-TG-S-5342 00 KAIG3-RFI-TG-S-5342-00
KAIG3-RFI-TG-SU-1879 01 KAIG3-RFI-TG-SU-1879-01
KAIG3-RFI-TG-C-1381 01 KAIG3-RFI-TG-C-1381-01
KAIG3-RFI-SW-S-5340 00 KAIG3-RFI-SW-S-5340-00
KAIG3-RFI-SW-S-5339 00 KAIG3-RFI-SW-S-5339-00
KAIG3-RFI-SW-S-5338 00 KAIG3-RFI-SW-S-5338-00
KAIG3-RFI-DG-A-0651 00 KAIG3-RFI-DG-A-0651-00
KAIG3-RFI-PG-S-5337 00 KAIG3-RFI-PG-S-5337-00
KAIG3-RFI-ZG-SU-1890 00 KAIG3-RFI-ZG-SU-1890-00
KAIG3-RFI-MB-A-0650 00 KAIG3-RFI-MB-A-0650-00
KAIG3-RFI-DG-S-5335 00 KAIG3-RFI-DG-S-5335-00
KAIG3-RFI-SW-C-1396 00 KAIG3-RFI-SW-C-1396-00
KAIG3-RFI-ZG-SU-1886 00 KAIG3-RFI-ZG-SU-1886-00
KAIG3-RFI-CO-S-5341 00 KAIG3-RFI-CO-S-5341-00
KAIG3-RFI-CO-S-5279 01 KAIG3-RFI-CO-S-5279-01
KAIG3-RFI-PC-E-0304 00 KAIG3-RFI-PC-E-0304-00
KAIG3-RFI-CO-S-5276 01 KAIG3-RFI-CO-S-5276-01
KAIG3-RFI-CO-S-5275 01 KAIG3-RFI-CO-S-5275-01
KAIG3-RFI-SW-C-1419 00 KAIG3-RFI-SW-C-1419-00
KAIG3-RFI-CO-S-5274 01 KAIG3-RFI-CO-S-5274-01
KAIG3-RFI-SW-C-1418 00 KAIG3-RFI-SW-C-1418-00
KAIG3-RFI-SW-C-1417 00 KAIG3-RFI-SW-C-1417-00
KAIG3-RFI-SW-C-1416 00 KAIG3-RFI-SW-C-1416-00
KAIG3-RFI-SW-LS-0618 00 KAIG3-RFI-SW-LS-0618-00
KAIG3-RFI-SW-LS-0617 00 KAIG3-RFI-SW-LS-0617-00
KAIG3-RFI-PC-E-0303 00 KAIG3-RFI-PC-E-0303-00
KAIG3-RFI-PC-E-0302 00 KAIG3-RFI-PC-E-0302-00
KAIG3-RFI-PC-E-0301 00 KAIG3-RFI-PC-E-0301-00
KAIG3-RFI-PC-E-0300 00 KAIG3-RFI-PC-E-0300-00
KAIG3-RFI-CO-S-5318 00 KAIG3-RFI-CO-S-5318-00
KAIG3-RFI-SW-S-5327 00 KAIG3-RFI-SW-S-5327-00
KAIG3-RFI-SW-S-5326 00 KAIG3-RFI-SW-S-5326-00
KAIG3-RFI-MB-A-0649 00 KAIG3-RFI-MB-A-0649-00
KAIG3-RFI-WG-LS-0614 00 KAIG3-RFI-WG-LS-0614-00
KAIG3-RFI-ZG-S-5325 00 KAIG3-RFI-ZG-S-5325-00
KAIG3-RFI-SG-S-5324 00 KAIG3-RFI-SG-S-5324-00
KAIG3-RFI-CO-S-5334 00 KAIG3-RFI-CO-S-5334-00
KAIG3-RFI-MB-A-0648 00 KAIG3-RFI-MB-A-0648-00
KAIG3-RFI-CO-S-5333 00 KAIG3-RFI-CO-S-5333-00
KAIG3-RFI-MB-A-0647 00 KAIG3-RFI-MB-A-0647-00
KAIG3-RFI-CO-S-5332 00 KAIG3-RFI-CO-S-5332-00
KAIG3-RFI-MB-A-0646 00 KAIG3-RFI-MB-A-0646-00
KAIG3-RFI-DG-S-5323 00 KAIG3-RFI-DG-S-5323-00
KAIG3-RFI-PC-LC-0292 00 KAIG3-RFI-PC-LC-0292-00
KAIG3-RFI-PC-LC-0291 00 KAIG3-RFI-PC-LC-0291-00
KAIG3-RFI-PC-LC-0290 00 KAIG3-RFI-PC-LC-0290-00
KAIG3-RFI-PC-E-0299 00 KAIG3-RFI-PC-E-0299-00
KAIG3-RFI-SW-LS-0616 00 KAIG3-RFI-SW-LS-0616-00
KAIG3-RFI-SW-LS-0615 00 KAIG3-RFI-SW-LS-0615-00
KAIG3-RFI-SW-C-1414 00 KAIG3-RFI-SW-C-1414-00
KAIG3-RFI-SW-C-1413 00 KAIG3-RFI-SW-C-1413-00
KAIG3-RFI-SW-C-1412 00 KAIG3-RFI-SW-C-1412-00
KAIG3-RFI-SW-C-1411 00 KAIG3-RFI-SW-C-1411-00
KAIG3-RFI-SW-C-1410 00 KAIG3-RFI-SW-C-1410-00
KAIG3-RFI-SW-C-1409 00 KAIG3-RFI-SW-C-1409-00
KAIG3-RFI-SW-C-1408 00 KAIG3-RFI-SW-C-1408-00
KAIG3-RFI-SW-C-1402 00 KAIG3-RFI-SW-C-1402-00
KAIG3-RFI-SW-C-1401 00 KAIG3-RFI-SW-C-1401-00
KAIG3-RFI-SW-C-1351 00 KAIG3-RFI-SW-C-1351-00
KAIG3-RFI-SW-C-1273 01 KAIG3-RFI-SW-C-1273-01
KAIG3-RFI-SW-C-0914 02 KAIG3-RFI-SW-C-0914-02
KAIG3-RFI-CO-SU-1888 00 KAIG3-RFI-CO-SU-1888-00
KAIG3-RFI-CO-SU-1887 00 KAIG3-RFI-CO-SU-1887-00
KAIG3-RFI-CO-SU-1871 01 KAIG3-RFI-CO-SU-1871-01
KAIG3-RFI-CO-S-5331 00 KAIG3-RFI-CO-S-5331-00
KAIG3-RFI-CO-S-5330 00 KAIG3-RFI-CO-S-5330-00
KAIG3-RFI-CO-S-5329 00 KAIG3-RFI-CO-S-5329-00
KAIG3-RFI-CO-S-5328 00 KAIG3-RFI-CO-S-5328-00
KAIG3-RFI-CO-S-5115 01 KAIG3-RFI-CO-S-5115-01
KAIG3-RFI-CO-SU-1885 00 KAIG3-RFI-CO-SU-1885-00
KAIG3-RFI-CO-S-5322 00 KAIG3-RFI-CO-S-5322-00
KAIG3-RFI-CO-S-5321 00 KAIG3-RFI-CO-S-5321-00
KAIG3-RFI-CO-S-5320 00 KAIG3-RFI-CO-S-5320-00
KAIG3-RFI-CO-S-5319 00 KAIG3-RFI-CO-S-5319-00
KAIG3-RFI-CO-S-5259 01 KAIG3-RFI-CO-S-5259-01
KAIG3-RFI-CO-S-5257 01 KAIG3-RFI-CO-S-5257-01
KAIG3-RFI-CO-S-5255 01 KAIG3-RFI-CO-S-5255-01
KAIG3-RFI-CO-S-5237 01 KAIG3-RFI-CO-S-5237-01
KAIG3-RFI-MB-LC-0289 00 KAIG3-RFI-MB-LC-0289-00
KAIG3-RFI-PC-E-0298 00 KAIG3-RFI-PC-E-0298-00
KAIG3-RFI-CO-E-0182 01 KAIG3-RFI-CO-E-0182-01
KAIG3-RFI-SW-LS-0613 00 KAIG3-RFI-SW-LS-0613-00
KAIG3-RFI-SW-LS-0612 00 KAIG3-RFI-SW-LS-0612-00
KAIG3-RFI-SW-C-1400 00 KAIG3-RFI-SW-C-1400-00
KAIG3-RFI-SW-C-1395 00 KAIG3-RFI-SW-C-1395-00
KAIG3-RFI-SW-C-1394 00 KAIG3-RFI-SW-C-1394-00
KAIG3-RFI-SW-C-1393 00 KAIG3-RFI-SW-C-1393-00
KAIG3-RFI-CO-E-0183 01 KAIG3-RFI-CO-E-0183-01
KAIG3-RFI-PC-E-0253 01 KAIG3-RFI-PC-E-0253-01
KAIG3-RFI-PC-E-0255 01 KAIG3-RFI-PC-E-0255-01
KAIG3-RFI-CO-SU-1884 00 KAIG3-RFI-CO-SU-1884-00
KAIG3-RFI-SW-A-0645 00 KAIG3-RFI-SW-A-0645-00
KAIG3-RFI-CO-SU-1883 00 KAIG3-RFI-CO-SU-1883-00
KAIG3-RFI-CO-C-1403 00 KAIG3-RFI-CO-C-1403-00
KAIG3-RFI-MB-A-0644 00 KAIG3-RFI-MB-A-0644-00
KAIG3-RFI-CO-S-5317 00 KAIG3-RFI-CO-S-5317-00
KAIG3-RFI-CO-P-0153 00 KAIG3-RFI-CO-P-0153-00
KAIG3-RFI-CO-S-5316 00 KAIG3-RFI-CO-S-5316-00
KAIG3-RFI-CO-S-5315 00 KAIG3-RFI-CO-S-5315-00
KAIG3-RFI-CO-S-5314 00 KAIG3-RFI-CO-S-5314-00
KAIG3-RFI-CO-S-5313 00 KAIG3-RFI-CO-S-5313-00
KAIG3-RFI-CO-S-5312 00 KAIG3-RFI-CO-S-5312-00
KAIG3-RFI-SW-C-1406 00 KAIG3-RFI-SW-C-1406-00
KAIG3-RFI-SW-C-1405 00 KAIG3-RFI-SW-C-1405-00
KAIG3-RFI-SW-C-1404 00 KAIG3-RFI-SW-C-1404-00
KAIG3-RFI-CO-S-5311 00 KAIG3-RFI-CO-S-5311-00
KAIG3-RFI-CO-S-5310 00 KAIG3-RFI-CO-S-5310-00
KAIG3-RFI-MB-A-0643 00 KAIG3-RFI-MB-A-0643-00
KAIG3-RFI-SW-LS-0611 00 KAIG3-RFI-SW-LS-0611-00
KAIG3-RFI-SW-LS-0610 00 KAIG3-RFI-SW-LS-0610-00
KAIG3-RFI-SW-LS-0609 00 KAIG3-RFI-SW-LS-0609-00
KAIG3-RFI-SW-LS-0608 00 KAIG3-RFI-SW-LS-0608-00
KAIG3-RFI-SW-LS-0607 00 KAIG3-RFI-SW-LS-0607-00
KAIG3-RFI-SW-LS-0606 00 KAIG3-RFI-SW-LS-0606-00
KAIG3-RFI-SW-LS-0605 00 KAIG3-RFI-SW-LS-0605-00
KAIG3-RFI-CO-SU-1882 00 KAIG3-RFI-CO-SU-1882-00
KAIG3-RFI-CO-S-4966 03 KAIG3-RFI-CO-S-4966-03
KAIG3-RFI-SW-C-1392 00 KAIG3-RFI-SW-C-1392-00
KAIG3-RFI-CO-S-5308 00 KAIG3-RFI-CO-S-5308-00
KAIG3-RFI-SW-C-1391 00 KAIG3-RFI-SW-C-1391-00
KAIG3-RFI-CO-S-5307 00 KAIG3-RFI-CO-S-5307-00
KAIG3-RFI-SW-C-1390 00 KAIG3-RFI-SW-C-1390-00
KAIG3-RFI-SW-C-1389 00 KAIG3-RFI-SW-C-1389-00
KAIG3-RFI-CO-S-5306 00 KAIG3-RFI-CO-S-5306-00
KAIG3-RFI-CO-S-5305 00 KAIG3-RFI-CO-S-5305-00
KAIG3-RFI-SW-C-1388 00 KAIG3-RFI-SW-C-1388-00
KAIG3-RFI-CO-S-5304 00 KAIG3-RFI-CO-S-5304-00
KAIG3-RFI-SW-C-1387 00 KAIG3-RFI-SW-C-1387-00
KAIG3-RFI-CO-S-5303 00 KAIG3-RFI-CO-S-5303-00
KAIG3-RFI-SW-C-1386 00 KAIG3-RFI-SW-C-1386-00
KAIG3-RFI-CO-S-5302 00 KAIG3-RFI-CO-S-5302-00
KAIG3-RFI-SW-C-1380 00 KAIG3-RFI-SW-C-1380-00
KAIG3-RFI-CO-S-5301 00 KAIG3-RFI-CO-S-5301-00
KAIG3-RFI-CO-S-5300 00 KAIG3-RFI-CO-S-5300-00
KAIG3-RFI-SW-C-1379 00 KAIG3-RFI-SW-C-1379-00
KAIG3-RFI-CO-S-5299 00 KAIG3-RFI-CO-S-5299-00
KAIG3-RFI-SW-C-1378 00 KAIG3-RFI-SW-C-1378-00
KAIG3-RFI-CO-S-5298 00 KAIG3-RFI-CO-S-5298-00
KAIG3-RFI-SW-C-1377 00 KAIG3-RFI-SW-C-1377-00
KAIG3-RFI-SW-C-1303 01 KAIG3-RFI-SW-C-1303-01
KAIG3-RFI-SG-S-5245 01 KAIG3-RFI-SG-S-5245-01
KAIG3-RFI-SW-A-0642 00 KAIG3-RFI-SW-A-0642-00
KAIG3-RFI-WG-C-1385 00 KAIG3-RFI-WG-C-1385-00
KAIG3-RFI-SW-C-1399 00 KAIG3-RFI-SW-C-1399-00
KAIG3-RFI-SW-C-1398 00 KAIG3-RFI-SW-C-1398-00
KAIG3-RFI-SW-C-1397 00 KAIG3-RFI-SW-C-1397-00
KAIG3-RFI-SW-C-1300 00 KAIG3-RFI-SW-C-1300-00
KAIG3-RFI-SW-C-1299 00 KAIG3-RFI-SW-C-1299-00
KAIG3-RFI-SW-C-1298 00 KAIG3-RFI-SW-C-1298-00
KAIG3-RFI-SW-C-1297 00 KAIG3-RFI-SW-C-1297-00
KAIG3-RFI-CO-C-1383 00 KAIG3-RFI-CO-C-1383-00
KAIG3-RFI-CO-C-1382 00 KAIG3-RFI-CO-C-1382-00
KAIG3-RFI-CO-C-1384 00 KAIG3-RFI-CO-C-1384-00
KAIG3-RFI-CO-SU-1881 00 KAIG3-RFI-CO-SU-1881-00
KAIG3-RFI-CO-SU-1880 00 KAIG3-RFI-CO-SU-1880-00
KAIG3-RFI-CO-SU-1877 00 KAIG3-RFI-CO-SU-1877-00
KAIG3-RFI-CO-S-5297 00 KAIG3-RFI-CO-S-5297-00
KAIG3-RFI-CO-S-5296 00 KAIG3-RFI-CO-S-5296-00
KAIG3-RFI-CO-S-5295 00 KAIG3-RFI-CO-S-5295-00
KAIG3-RFI-CO-S-5283 00 KAIG3-RFI-CO-S-5283-00
KAIG3-RFI-CO-S-5291 00 KAIG3-RFI-CO-S-5291-00
KAIG3-RFI-CO-S-5290 00 KAIG3-RFI-CO-S-5290-00
KAIG3-RFI-CO-S-5289 00 KAIG3-RFI-CO-S-5289-00
KAIG3-RFI-ZG-S-5294 00 KAIG3-RFI-ZG-S-5294-00
KAIG3-RFI-MB-A-0641 00 KAIG3-RFI-MB-A-0641-00
KAIG3-RFI-TG-SU-1879 00 KAIG3-RFI-TG-SU-1879-00
KAIG3-RFI-ZG-S-5292 00 KAIG3-RFI-ZG-S-5292-00
KAIG3-RFI-ZG-SU-1878 00 KAIG3-RFI-ZG-SU-1878-00
KAIG3-RFI-PG-S-5286 00 KAIG3-RFI-PG-S-5286-00
KAIG3-RFI-PG-SU-1876 00 KAIG3-RFI-PG-SU-1876-00
KAIG3-RFI-PG-SS-0010 00 KAIG3-RFI-PG-SS-0010-00
KAIG3-RFI-TG-C-1381 00 KAIG3-RFI-TG-C-1381-00
KAIG3-RFI-DG-S-5215 01 KAIG3-RFI-DG-S-5215-01
KAIG3-RFI-ZG-S-5288 00 KAIG3-RFI-ZG-S-5288-00
KAIG3-RFI-PG-S-5287 00 KAIG3-RFI-PG-S-5287-00
KAIG3-RFI-ZG-S-5285 00 KAIG3-RFI-ZG-S-5285-00
KAIG3-RFI-ZG-S-5284-00 00 KAIG3-RFI-ZG-S-5284-00-00
KAIG3-RFI-SW-LS-0604 00 KAIG3-RFI-SW-LS-0604-00
KAIG3-RFI-SW-LS-0603 00 KAIG3-RFI-SW-LS-0603-00
KAIG3-RFI-SW-C-1376 00 KAIG3-RFI-SW-C-1376-00
KAIG3-RFI-SW-C-1375 00 KAIG3-RFI-SW-C-1375-00
KAIG3-RFI-SW-C-1374 00 KAIG3-RFI-SW-C-1374-00
KAIG3-RFI-SW-C-0924 01 KAIG3-RFI-SW-C-0924-01
KAIG3-RFI-PC-E-0297 00 KAIG3-RFI-PC-E-0297-00
KAIG3-RFI-PC-E-0296 00 KAIG3-RFI-PC-E-0296-00
KAIG3-RFI-PC-LC-0288 00 KAIG3-RFI-PC-LC-0288-00
KAIG3-RFI-PC-LC-0287 00 KAIG3-RFI-PC-LC-0287-00
KAIG3-RFI-PC-LC-0286 00 KAIG3-RFI-PC-LC-0286-00
KAIG3-RFI-SW-LS-0602 00 KAIG3-RFI-SW-LS-0602-00
KAIG3-RFI-SW-LS-0601 00 KAIG3-RFI-SW-LS-0601-00
KAIG3-RFI-SW-LS-0600 00 KAIG3-RFI-SW-LS-0600-00
KAIG3-RFI-SW-LS-0599 00 KAIG3-RFI-SW-LS-0599-00
KAIG3-RFI-SW-LS-0598 00 KAIG3-RFI-SW-LS-0598-00
KAIG3-RFI-SW-LS-0597 00 KAIG3-RFI-SW-LS-0597-00
KAIG3-RFI-SW-C-1372 00 KAIG3-RFI-SW-C-1372-00
KAIG3-RFI-SW-C-1371 00 KAIG3-RFI-SW-C-1371-00
KAIG3-RFI-SW-C-1370 00 KAIG3-RFI-SW-C-1370-00
KAIG3-RFI-SW-C-1369 00 KAIG3-RFI-SW-C-1369-00
KAIG3-RFI-SW-C-1368 00 KAIG3-RFI-SW-C-1368-00
KAIG3-RFI-SW-C-1367 00 KAIG3-RFI-SW-C-1367-00
KAIG3-RFI-SW-A-0640 00 KAIG3-RFI-SW-A-0640-00
KAIG3-RFI-SW-C-1366 00 KAIG3-RFI-SW-C-1366-00
KAIG3-RFI-SW-C-1355 00 KAIG3-RFI-SW-C-1355-00
KAIG3-RFI-SW-S-5278 00 KAIG3-RFI-SW-S-5278-00
KAIG3-RFI-SW-S-5277 00 KAIG3-RFI-SW-S-5277-00
KAIG3-RFI-MB-A-0639 00 KAIG3-RFI-MB-A-0639-00
KAIG3-RFI-MB-A-0638 00 KAIG3-RFI-MB-A-0638-00
KAIG3-RFI-SW-C-1264 01 KAIG3-RFI-SW-C-1264-01
KAIG3-RFI-CO-SU-1875 00 KAIG3-RFI-CO-SU-1875-00
KAIG3-RFI-CO-S-5282 00 KAIG3-RFI-CO-S-5282-00
KAIG3-RFI-CO-S-5281 00 KAIG3-RFI-CO-S-5281-00
KAIG3-RFI-CO-S-5280 00 KAIG3-RFI-CO-S-5280-00
KAIG3-RFI-CO-S-5279 00 KAIG3-RFI-CO-S-5279-00
KAIG3-RFI-PC-E-0295 00 KAIG3-RFI-PC-E-0295-00
KAIG3-RFI-PC-LC-0285 00 KAIG3-RFI-PC-LC-0285-00
KAIG3-RFI-ZG-S-5273 00 KAIG3-RFI-ZG-S-5273-00
KAIG3-RFI-ZG-SU-1873 00 KAIG3-RFI-ZG-SU-1873-00
KAIG3-RFI-ZG-S-5272 00 KAIG3-RFI-ZG-S-5272-00
KAIG3-RFI-SG-S-5250 00 KAIG3-RFI-SG-S-5250-00
KAIG3-RFI-SG-SU-1866 00 KAIG3-RFI-SG-SU-1866-00
KAIG3-RFI-TG-S-5271 00 KAIG3-RFI-TG-S-5271-00
KAIG3-RFI-DG-S-5270 00 KAIG3-RFI-DG-S-5270-00
KAIG3-RFI-DG-SU-1872 00 KAIG3-RFI-DG-SU-1872-00
KAIG3-RFI-ZG-S-5269 00 KAIG3-RFI-ZG-S-5269-00
KAIG3-RFI-ZG-S-5268 00 KAIG3-RFI-ZG-S-5268-00
KAIG3-RFI-ZG-E-0294 00 KAIG3-RFI-ZG-E-0294-00
KAIG3-RFI-SW-LS-0594 00 KAIG3-RFI-SW-LS-0594-00
KAIG3-RFI-SW-LS-0524 01 KAIG3-RFI-SW-LS-0524-01
KAIG3-RFI-SW-C-1361 00 KAIG3-RFI-SW-C-1361-00
KAIG3-RFI-SW-C-1360 00 KAIG3-RFI-SW-C-1360-00
KAIG3-RFI-SW-C-1359 00 KAIG3-RFI-SW-C-1359-00
KAIG3-RFI-SW-C-1358 00 KAIG3-RFI-SW-C-1358-00
KAIG3-RFI-CO-SU-1874 00 KAIG3-RFI-CO-SU-1874-00
KAIG3-RFI-SW-C-1357 00 KAIG3-RFI-SW-C-1357-00
KAIG3-RFI-CO-S-5276 00 KAIG3-RFI-CO-S-5276-00
KAIG3-RFI-SW-C-1356 00 KAIG3-RFI-SW-C-1356-00
KAIG3-RFI-CO-S-5275 00 KAIG3-RFI-CO-S-5275-00
KAIG3-RFI-SW-C-1354 00 KAIG3-RFI-SW-C-1354-00
KAIG3-RFI-SW-C-1353 00 KAIG3-RFI-SW-C-1353-00
KAIG3-RFI-SW-C-1352 00 KAIG3-RFI-SW-C-1352-00
KAIG3-RFI-SW-C-1340 00 KAIG3-RFI-SW-C-1340-00
KAIG3-RFI-CO-S-5274 00 KAIG3-RFI-CO-S-5274-00
KAIG3-RFI-CO-C-1365 00 KAIG3-RFI-CO-C-1365-00
KAIG3-RFI-CO-S-5267 00 KAIG3-RFI-CO-S-5267-00
KAIG3-RFI-CO-S-5266 00 KAIG3-RFI-CO-S-5266-00
KAIG3-RFI-CO-S-5144 01 KAIG3-RFI-CO-S-5144-01
KAIG3-RFI-CO-C-1364 00 KAIG3-RFI-CO-C-1364-00
KAIG3-RFI-CO-C-1363 00 KAIG3-RFI-CO-C-1363-00
KAIG3-RFI-CO-C-1362 00 KAIG3-RFI-CO-C-1362-00
KAIG3-RFI-CO-C-1342 00 KAIG3-RFI-CO-C-1342-00
KAIG3-RFI-WG-SU-1504 02 KAIG3-RFI-WG-SU-1504-02
KAIG3-RFI-MB-S-5265 00 KAIG3-RFI-MB-S-5265-00
KAIG3-RFI-SW-S-5264 00 KAIG3-RFI-SW-S-5264-00
KAIG3-RFI-AG-S-5263 00 KAIG3-RFI-AG-S-5263-00
KAIG3-RFI-CO-C-1345 00 KAIG3-RFI-CO-C-1345-00
KAIG3-RFI-CO-SU-1871 00 KAIG3-RFI-CO-SU-1871-00
KAIG3-RFI-SW-LS-0596 00 KAIG3-RFI-SW-LS-0596-00
KAIG3-RFI-CO-S-5262 00 KAIG3-RFI-CO-S-5262-00
KAIG3-RFI-SW-C-1350 00 KAIG3-RFI-SW-C-1350-00
KAIG3-RFI-CO-S-5260 00 KAIG3-RFI-CO-S-5260-00
KAIG3-RFI-SW-C-1349 00 KAIG3-RFI-SW-C-1349-00
KAIG3-RFI-SW-C-1348 00 KAIG3-RFI-SW-C-1348-00
KAIG3-RFI-SW-C-1347 00 KAIG3-RFI-SW-C-1347-00
KAIG3-RFI-SW-C-1346 00 KAIG3-RFI-SW-C-1346-00
KAIG3-RFI-CO-S-5173 01 KAIG3-RFI-CO-S-5173-01
KAIG3-RFI-SW-C-1344 00 KAIG3-RFI-SW-C-1344-00
KAIG3-RFI-CO-S-5172 01 KAIG3-RFI-CO-S-5172-01
KAIG3-RFI-SW-C-1343 00 KAIG3-RFI-SW-C-1343-00
KAIG3-RFI-CO-S-5145 01 KAIG3-RFI-CO-S-5145-01
KAIG3-RFI-SW-C-1336 00 KAIG3-RFI-SW-C-1336-00
KAIG3-RFI-CO-S-4568 01 KAIG3-RFI-CO-S-4568-01
KAIG3-RFI-SW-C-1335 00 KAIG3-RFI-SW-C-1335-00
KAIG3-RFI-CO-S-4567 01 KAIG3-RFI-CO-S-4567-01
KAIG3-RFI-SW-C-1334 00 KAIG3-RFI-SW-C-1334-00
KAIG3-RFI-SW-C-1275 01 KAIG3-RFI-SW-C-1275-01
KAIG3-RFI-SW-C-1296 00 KAIG3-RFI-SW-C-1296-00
KAIG3-RFI-SW-C-1295 00 KAIG3-RFI-SW-C-1295-00
KAIG3-RFI-SW-C-1294 00 KAIG3-RFI-SW-C-1294-00
KAIG3-RFI-SW-C-1293 00 KAIG3-RFI-SW-C-1293-00
KAIG3-RFI-SW-C-1292 00 KAIG3-RFI-SW-C-1292-00
KAIG3-RFI-SW-C-1291 00 KAIG3-RFI-SW-C-1291-00
KAIG3-RFI-PC-E-0293 00 KAIG3-RFI-PC-E-0293-00
KAIG3-RFI-PC-E-0292 00 KAIG3-RFI-PC-E-0292-00
KAIG3-RFI-CO-S-5259 00 KAIG3-RFI-CO-S-5259-00
KAIG3-RFI-CO-S-5258 00 KAIG3-RFI-CO-S-5258-00
KAIG3-RFI-SW-LS-0593 00 KAIG3-RFI-SW-LS-0593-00
KAIG3-RFI-CO-S-5257 00 KAIG3-RFI-CO-S-5257-00
KAIG3-RFI-SW-LS-0592 00 KAIG3-RFI-SW-LS-0592-00
KAIG3-RFI-CO-S-5256 00 KAIG3-RFI-CO-S-5256-00
KAIG3-RFI-SW-C-1338 00 KAIG3-RFI-SW-C-1338-00
KAIG3-RFI-CO-S-5255 00 KAIG3-RFI-CO-S-5255-00
KAIG3-RFI-SW-C-1337 00 KAIG3-RFI-SW-C-1337-00
KAIG3-RFI-CO-S-5254 00 KAIG3-RFI-CO-S-5254-00
KAIG3-RFI-CO-S-5253 00 KAIG3-RFI-CO-S-5253-00
KAIG3-RFI-SW-C-1333 00 KAIG3-RFI-SW-C-1333-00
KAIG3-RFI-SW-C-1332 00 KAIG3-RFI-SW-C-1332-00
KAIG3-RFI-SW-C-1331 00 KAIG3-RFI-SW-C-1331-00
KAIG3-RFI-CO-S-5252 00 KAIG3-RFI-CO-S-5252-00
KAIG3-RFI-SW-C-1273 00 KAIG3-RFI-SW-C-1273-00
KAIG3-RFI-CO-S-5251 00 KAIG3-RFI-CO-S-5251-00
KAIG3-RFI-SW-C-1167 01 KAIG3-RFI-SW-C-1167-01
KAIG3-RFI-CO-S-5226 00 KAIG3-RFI-CO-S-5226-00
KAIG3-RFI-CO-S-5236 00 KAIG3-RFI-CO-S-5236-00
KAIG3-RFI-CO-S-5235 00 KAIG3-RFI-CO-S-5235-00
KAIG3-RFI-CO-S-5237 00 KAIG3-RFI-CO-S-5237-00
KAIG3-RFI-CO-S-5240 00 KAIG3-RFI-CO-S-5240-00
KAIG3-RFI-CO-S-5239 00 KAIG3-RFI-CO-S-5239-00
KAIG3-RFI-CO-S-5242 00 KAIG3-RFI-CO-S-5242-00
KAIG3-RFI-CO-S-5241 00 KAIG3-RFI-CO-S-5241-00
KAIG3-RFI-CO-S-5238 00 KAIG3-RFI-CO-S-5238-00
KAIG3-RFI-CO-S-5234 00 KAIG3-RFI-CO-S-5234-00
KAIG3-RFI-CO-S-5233 00 KAIG3-RFI-CO-S-5233-00
KAIG3-RFI-CO-S-5232 00 KAIG3-RFI-CO-S-5232-00
KAIG3-RFI-CO-C-1341 00 KAIG3-RFI-CO-C-1341-00
KAIG3-RFI-CO-S-4966 02 KAIG3-RFI-CO-S-4966-02
KAIG3-RFI-MC-S-5149 01 KAIG3-RFI-MC-S-5149-01
KAIG3-RFI-CO-SU-1870 00 KAIG3-RFI-CO-SU-1870-00
KAIG3-RFI-CO-SU-1869 00 KAIG3-RFI-CO-SU-1869-00
KAIG3-RFI-CO-SU-1868 00 KAIG3-RFI-CO-SU-1868-00
KAIG3-RFI-CO-SU-1867 00 KAIG3-RFI-CO-SU-1867-00
KAIG3-RFI-CO-SU-1864 00 KAIG3-RFI-CO-SU-1864-00
KAIG3-RFI-CO-SU-1862 00 KAIG3-RFI-CO-SU-1862-00
KAIG3-RFI-CO-SU-1861 00 KAIG3-RFI-CO-SU-1861-00
KAIG3-RFI-CO-SU-1863 00 KAIG3-RFI-CO-SU-1863-00
KAIG3-RFI-ZG-S-5249 00 KAIG3-RFI-ZG-S-5249-00
KAIG3-RFI-PG-S-5231 00 KAIG3-RFI-PG-S-5231-00
KAIG3-RFI-PG-S-5248 00 KAIG3-RFI-PG-S-5248-00
KAIG3-RFI-PG-SS-0009 00 KAIG3-RFI-PG-SS-0009-00
KAIG3-RFI-PG-SU-1860 00 KAIG3-RFI-PG-SU-1860-00
KAIG3-RFI-ZG-SU-1865 00 KAIG3-RFI-ZG-SU-1865-00
KAIG3-RFI-TG-S-5247 00 KAIG3-RFI-TG-S-5247-00
KAIG3-RFI-TG-S-5246 00 KAIG3-RFI-TG-S-5246-00
KAIG3-RFI-SW-C-1330 00 KAIG3-RFI-SW-C-1330-00
KAIG3-RFI-SW-C-1329 00 KAIG3-RFI-SW-C-1329-00
KAIG3-RFI-SG-S-5245 00 KAIG3-RFI-SG-S-5245-00
KAIG3-RFI-SW-C-1328 00 KAIG3-RFI-SW-C-1328-00
KAIG3-RFI-SW-C-1327 00 KAIG3-RFI-SW-C-1327-00
KAIG3-RFI-SW-C-1326 00 KAIG3-RFI-SW-C-1326-00
KAIG3-RFI-ZG-S-5244 00 KAIG3-RFI-ZG-S-5244-00
KAIG3-RFI-TG-S-5243 00 KAIG3-RFI-TG-S-5243-00
KAIG3-RFI-WG-C-1322 00 KAIG3-RFI-WG-C-1322-00
KAIG3-RFI-TG-S-5230 00 KAIG3-RFI-TG-S-5230-00
KAIG3-RFI-SW-LS-0591 00 KAIG3-RFI-SW-LS-0591-00
KAIG3-RFI-SW-LS-0590 00 KAIG3-RFI-SW-LS-0590-00
KAIG3-RFI-SW-C-1325 00 KAIG3-RFI-SW-C-1325-00
KAIG3-RFI-SW-C-1324 00 KAIG3-RFI-SW-C-1324-00
KAIG3-RFI-SW-C-1317 00 KAIG3-RFI-SW-C-1317-00
KAIG3-RFI-SW-C-1316 00 KAIG3-RFI-SW-C-1316-00
KAIG3-RFI-SW-C-1315 00 KAIG3-RFI-SW-C-1315-00
KAIG3-RFI-SW-C-1314 00 KAIG3-RFI-SW-C-1314-00
KAIG3-RFI-SW-C-1313 00 KAIG3-RFI-SW-C-1313-00
KAIG3-RFI-SW-C-1312 00 KAIG3-RFI-SW-C-1312-00
KAIG3-RFI-SW-C-1311 00 KAIG3-RFI-SW-C-1311-00
KAIG3-RFI-SW-C-1310 00 KAIG3-RFI-SW-C-1310-00
KAIG3-RFI-SW-C-1238 01 KAIG3-RFI-SW-C-1238-01
KAIG3-RFI-PA-C-1323 00 KAIG3-RFI-PA-C-1323-00
KAIG3-RFI-PA-C-1319 00 KAIG3-RFI-PA-C-1319-00
KAIG3-RFI-PA-C-1318 00 KAIG3-RFI-PA-C-1318-00
KAIG3-RFI-CO-SU-1857 00 KAIG3-RFI-CO-SU-1857-00
KAIG3-RFI-CO-SU-1856 00 KAIG3-RFI-CO-SU-1856-00
KAIG3-RFI-CO-S-5225 00 KAIG3-RFI-CO-S-5225-00
KAIG3-RFI-CO-S-5224 00 KAIG3-RFI-CO-S-5224-00
KAIG3-RFI-CO-S-5223 00 KAIG3-RFI-CO-S-5223-00
KAIG3-RFI-CO-A-0635 00 KAIG3-RFI-CO-A-0635-00
KAIG3-RFI-CO-A-0636 00 KAIG3-RFI-CO-A-0636-00
KAIG3-RFI-CO-A-0637 00 KAIG3-RFI-CO-A-0637-00
KAIG3-RFI-CO-C-1320 00 KAIG3-RFI-CO-C-1320-00
KAIG3-RFI-CO-C-1321 00 KAIG3-RFI-CO-C-1321-00
KAIG3-RFI-CO-SU-1858 00 KAIG3-RFI-CO-SU-1858-00
KAIG3-RFI-CO-C-1236 00 KAIG3-RFI-CO-C-1236-00
KAIG3-RFI-CO-S-5227 00 KAIG3-RFI-CO-S-5227-00
KAIG3-RFI-CO-S-5228 00 KAIG3-RFI-CO-S-5228-00
KAIG3-RFI-CO-S-5229 00 KAIG3-RFI-CO-S-5229-00
KAIG3-RFI-CO-SU-1859 00 KAIG3-RFI-CO-SU-1859-00
KAIG3-RFI-DG-E-0291 00 KAIG3-RFI-DG-E-0291-00
KAIG3-RFI-PC-E-0290 00 KAIG3-RFI-PC-E-0290-00
KAIG3-RFI-PC-E-0289 00 KAIG3-RFI-PC-E-0289-00
KAIG3-RFI-DG-LC-0284 00 KAIG3-RFI-DG-LC-0284-00
KAIG3-RFI-PC-LC-0283 00 KAIG3-RFI-PC-LC-0283-00
KAIG3-RFI-PC-LC-0282 00 KAIG3-RFI-PC-LC-0282-00
KAIG3-RFI-PC-LC-0281 00 KAIG3-RFI-PC-LC-0281-00
KAIG3-RFI-PC-LC-0280 00 KAIG3-RFI-PC-LC-0280-00
KAIG3-RFI-PC-LC-0279 00 KAIG3-RFI-PC-LC-0279-00
KAIG3-RFI-PC-LC-0278 00 KAIG3-RFI-PC-LC-0278-00
KAIG3-RFI-TG-C-1237 01 KAIG3-RFI-TG-C-1237-01
KAIG3-RFI-WG-C-1235 00 KAIG3-RFI-WG-C-1235-00
KAIG3-RFI-SW-LS-0589 00 KAIG3-RFI-SW-LS-0589-00
KAIG3-RFI-SW-LS-0588 00 KAIG3-RFI-SW-LS-0588-00
KAIG3-RFI-SW-LS-0587 00 KAIG3-RFI-SW-LS-0587-00
KAIG3-RFI-SW-LS-0586 00 KAIG3-RFI-SW-LS-0586-00
KAIG3-RFI-SW-C-1309 00 KAIG3-RFI-SW-C-1309-00
KAIG3-RFI-ZG-S-5216 00 KAIG3-RFI-ZG-S-5216-00
KAIG3-RFI-ZG-SU-1855 00 KAIG3-RFI-ZG-SU-1855-00
KAIG3-RFI-ZG-C-1307 00 KAIG3-RFI-ZG-C-1307-00
KAIG3-RFI-DG-S-5215 00 KAIG3-RFI-DG-S-5215-00
KAIG3-RFI-DG-SU-1850 00 KAIG3-RFI-DG-SU-1850-00
KAIG3-RFI-PG-C-1308 00 KAIG3-RFI-PG-C-1308-00
KAIG3-RFI-MB-A-0634 00 KAIG3-RFI-MB-A-0634-00
KAIG3-RFI-ZG-C-1306 00 KAIG3-RFI-ZG-C-1306-00
KAIG3-RFI-CO-S-5219 00 KAIG3-RFI-CO-S-5219-00
KAIG3-RFI-CO-S-5218 00 KAIG3-RFI-CO-S-5218-00
KAIG3-RFI-CO-S-5217 00 KAIG3-RFI-CO-S-5217-00
KAIG3-RFI-MB-E-0288 00 KAIG3-RFI-MB-E-0288-00
KAIG3-RFI-MB-LC-0277 00 KAIG3-RFI-MB-LC-0277-00
KAIG3-RFI-ZG-S-5212 00 KAIG3-RFI-ZG-S-5212-00
KAIG3-RFI-ZG-SU-1853 00 KAIG3-RFI-ZG-SU-1853-00
KAIG3-RFI-PG-C-1277 00 KAIG3-RFI-PG-C-1277-00
KAIG3-RFI-PG-SU-1849 00 KAIG3-RFI-PG-SU-1849-00
KAIG3-RFI-PG-C-1276 00 KAIG3-RFI-PG-C-1276-00
KAIG3-RFI-CO-SU-1839 01 KAIG3-RFI-CO-SU-1839-01
KAIG3-RFI-CO-SU-1854 00 KAIG3-RFI-CO-SU-1854-00
KAIG3-RFI-CO-SU-1852 00 KAIG3-RFI-CO-SU-1852-00
KAIG3-RFI-CO-SU-1851 00 KAIG3-RFI-CO-SU-1851-00
KAIG3-RFI-CO-C-1301 00 KAIG3-RFI-CO-C-1301-00
KAIG3-RFI-CO-S-5152 01 KAIG3-RFI-CO-S-5152-01
KAIG3-RFI-CO-S-5153 01 KAIG3-RFI-CO-S-5153-01
KAIG3-RFI-CO-S-5160 01 KAIG3-RFI-CO-S-5160-01
KAIG3-RFI-CO-S-5101 01 KAIG3-RFI-CO-S-5101-01
KAIG3-RFI-CO-S-5060 01 KAIG3-RFI-CO-S-5060-01
KAIG3-RFI-CO-S-5214 00 KAIG3-RFI-CO-S-5214-00
KAIG3-RFI-CO-S-5213 00 KAIG3-RFI-CO-S-5213-00
KAIG3-RFI-CO-S-5211 00 KAIG3-RFI-CO-S-5211-00
KAIG3-RFI-CO-S-5209 00 KAIG3-RFI-CO-S-5209-00
KAIG3-RFI-CO-S-5208 00 KAIG3-RFI-CO-S-5208-00
KAIG3-RFI-CO-S-5207 00 KAIG3-RFI-CO-S-5207-00
KAIG3-RFI-CO-S-5206 00 KAIG3-RFI-CO-S-5206-00
KAIG3-RFI-MB-E-0287 00 KAIG3-RFI-MB-E-0287-00
KAIG3-RFI-CO-S-5205 00 KAIG3-RFI-CO-S-5205-00
KAIG3-RFI-CO-S-5204 00 KAIG3-RFI-CO-S-5204-00
KAIG3-RFI-CO-S-5203 00 KAIG3-RFI-CO-S-5203-00
KAIG3-RFI-SW-C-1305 00 KAIG3-RFI-SW-C-1305-00
KAIG3-RFI-SW-C-1304 00 KAIG3-RFI-SW-C-1304-00
KAIG3-RFI-SW-C-1303 00 KAIG3-RFI-SW-C-1303-00
KAIG3-RFI-SW-C-1302 00 KAIG3-RFI-SW-C-1302-00
KAIG3-RFI-SW-C-1275 00 KAIG3-RFI-SW-C-1275-00
KAIG3-RFI-SW-C-1274 00 KAIG3-RFI-SW-C-1274-00
KAIG3-RFI-SW-C-1272 00 KAIG3-RFI-SW-C-1272-00
KAIG3-RFI-SW-C-1270 00 KAIG3-RFI-SW-C-1270-00
KAIG3-RFI-SW-C-1269 00 KAIG3-RFI-SW-C-1269-00
KAIG3-RFI-SW-C-1255 01 KAIG3-RFI-SW-C-1255-01
KAIG3-RFI-SW-LS-0585 00 KAIG3-RFI-SW-LS-0585-00
KAIG3-RFI-SW-LS-0584 00 KAIG3-RFI-SW-LS-0584-00
KAIG3-RFI-MB-LC-0276 00 KAIG3-RFI-MB-LC-0276-00
KAIG3-RFI-SW-C-1290 00 KAIG3-RFI-SW-C-1290-00
KAIG3-RFI-SW-C-1289 00 KAIG3-RFI-SW-C-1289-00
KAIG3-RFI-SW-C-1288 00 KAIG3-RFI-SW-C-1288-00
KAIG3-RFI-SW-C-1287 00 KAIG3-RFI-SW-C-1287-00
KAIG3-RFI-SW-C-1286 00 KAIG3-RFI-SW-C-1286-00
KAIG3-RFI-SW-C-1285 00 KAIG3-RFI-SW-C-1285-00
KAIG3-RFI-SW-C-1284 00 KAIG3-RFI-SW-C-1284-00
KAIG3-RFI-SW-C-1283 00 KAIG3-RFI-SW-C-1283-00
KAIG3-RFI-SW-C-1282 00 KAIG3-RFI-SW-C-1282-00
KAIG3-RFI-SW-C-1281 00 KAIG3-RFI-SW-C-1281-00
KAIG3-RFI-SW-C-1280 00 KAIG3-RFI-SW-C-1280-00
KAIG3-RFI-SW-C-1279 00 KAIG3-RFI-SW-C-1279-00
KAIG3-RFI-SW-C-1278 00 KAIG3-RFI-SW-C-1278-00
KAIG3-RFI-SW-C-1230 00 KAIG3-RFI-SW-C-1230-00
KAIG3-RFI-SW-C-1229 00 KAIG3-RFI-SW-C-1229-00
KAIG3-RFI-SW-C-1228 00 KAIG3-RFI-SW-C-1228-00
KAIG3-RFI-SW-C-1227 00 KAIG3-RFI-SW-C-1227-00
KAIG3-RFI-SW-C-1226 00 KAIG3-RFI-SW-C-1226-00
KAIG3-RFI-TG-S-5202 00 KAIG3-RFI-TG-S-5202-00
KAIG3-RFI-TG-SU-1846 00 KAIG3-RFI-TG-SU-1846-00
KAIG3-RFI-ZG-S-5200 00 KAIG3-RFI-ZG-S-5200-00
KAIG3-RFI-ZG-S-5199 00 KAIG3-RFI-ZG-S-5199-00
KAIG3-RFI-WG-LS-0583 00 KAIG3-RFI-WG-LS-0583-00
KAIG3-RFI-WG-LS-0582 00 KAIG3-RFI-WG-LS-0582-00
KAIG3-RFI-WG-LS-0581 00 KAIG3-RFI-WG-LS-0581-00
KAIG3-RFI-WG-LS-0580 00 KAIG3-RFI-WG-LS-0580-00
KAIG3-RFI-WG-LS-0579 00 KAIG3-RFI-WG-LS-0579-00
KAIG3-RFI-AG-S-5191 00 KAIG3-RFI-AG-S-5191-00
KAIG3-RFI-MB-A-0633 00 KAIG3-RFI-MB-A-0633-00
KAIG3-RFI-ZG-S-5188 00 KAIG3-RFI-ZG-S-5188-00
KAIG3-RFI-ZG-S-5198 00 KAIG3-RFI-ZG-S-5198-00
KAIG3-RFI-SW-C-1271 00 KAIG3-RFI-SW-C-1271-00
KAIG3-RFI-SW-C-1268 00 KAIG3-RFI-SW-C-1268-00
KAIG3-RFI-SW-C-1267 00 KAIG3-RFI-SW-C-1267-00
KAIG3-RFI-SW-C-1266 00 KAIG3-RFI-SW-C-1266-00
KAIG3-RFI-SW-C-1265 00 KAIG3-RFI-SW-C-1265-00
KAIG3-RFI-SW-C-1258 00 KAIG3-RFI-SW-C-1258-00
KAIG3-RFI-SW-C-0451 01 KAIG3-RFI-SW-C-0451-01
KAIG3-RFI-SW-C-0389 01 KAIG3-RFI-SW-C-0389-01
KAIG3-RFI-CO-C-1208 01 KAIG3-RFI-CO-C-1208-01
KAIG3-RFI-CO-C-1206 01 KAIG3-RFI-CO-C-1206-01
KAIG3-RFI-CO-SU-1848 00 KAIG3-RFI-CO-SU-1848-00
KAIG3-RFI-CO-SU-1847 00 KAIG3-RFI-CO-SU-1847-00
KAIG3-RFI-CO-S-5201 00 KAIG3-RFI-CO-S-5201-00
KAIG3-RFI-CO-S-5197 00 KAIG3-RFI-CO-S-5197-00
KAIG3-RFI-CO-S-5196 00 KAIG3-RFI-CO-S-5196-00
KAIG3-RFI-CO-S-5195 00 KAIG3-RFI-CO-S-5195-00
KAIG3-RFI-CO-S-5194 00 KAIG3-RFI-CO-S-5194-00
KAIG3-RFI-CO-S-5193 00 KAIG3-RFI-CO-S-5193-00
KAIG3-RFI-SW-C-1264 00 KAIG3-RFI-SW-C-1264-00
KAIG3-RFI-SW-C-1263 00 KAIG3-RFI-SW-C-1263-00
KAIG3-RFI-SW-C-1262 00 KAIG3-RFI-SW-C-1262-00
KAIG3-RFI-SW-C-1261 00 KAIG3-RFI-SW-C-1261-00
KAIG3-RFI-SW-C-1260 00 KAIG3-RFI-SW-C-1260-00
KAIG3-RFI-SW-C-1259 00 KAIG3-RFI-SW-C-1259-00
KAIG3-RFI-SW-C-1257 00 KAIG3-RFI-SW-C-1257-00
KAIG3-RFI-SW-C-1256 00 KAIG3-RFI-SW-C-1256-00
KAIG3-RFI-SW-C-1255 00 KAIG3-RFI-SW-C-1255-00
KAIG3-RFI-SW-C-1254 00 KAIG3-RFI-SW-C-1254-00
KAIG3-RFI-SW-LS-0578 00 KAIG3-RFI-SW-LS-0578-00
KAIG3-RFI-SW-LS-0577 00 KAIG3-RFI-SW-LS-0577-00
KAIG3-RFI-SW-C-0914 01 KAIG3-RFI-SW-C-0914-01
KAIG3-RFI-CO-S-5192 00 KAIG3-RFI-CO-S-5192-00
KAIG3-RFI-CO-S-5187 00 KAIG3-RFI-CO-S-5187-00
KAIG3-RFI-CO-S-5186 00 KAIG3-RFI-CO-S-5186-00
KAIG3-RFI-CO-S-5185 00 KAIG3-RFI-CO-S-5185-00
KAIG3-RFI-CO-S-5184 00 KAIG3-RFI-CO-S-5184-00
KAIG3-RFI-CO-S-5182 00 KAIG3-RFI-CO-S-5182-00
KAIG3-RFI-CO-S-5181 00 KAIG3-RFI-CO-S-5181-00
KAIG3-RFI-CO-S-5180 00 KAIG3-RFI-CO-S-5180-00
KAIG3-RFI-CO-S-5179 00 KAIG3-RFI-CO-S-5179-00
KAIG3-RFI-CO-S-5183 00 KAIG3-RFI-CO-S-5183-00
KAIG3-RFI-CO-S-5178 00 KAIG3-RFI-CO-S-5178-00
KAIG3-RFI-CO-S-5177 00 KAIG3-RFI-CO-S-5177-00
KAIG3-RFI-AG-S-5190 00 KAIG3-RFI-AG-S-5190-00
KAIG3-RFI-AG-S-5189 00 KAIG3-RFI-AG-S-5189-00
KAIG3-RFI-MB-A-0632 00 KAIG3-RFI-MB-A-0632-00
KAIG3-RFI-CO-C-1243 00 KAIG3-RFI-CO-C-1243-00
KAIG3-RFI-CO-C-1242 00 KAIG3-RFI-CO-C-1242-00
KAIG3-RFI-CO-C-1244 00 KAIG3-RFI-CO-C-1244-00
KAIG3-RFI-CO-C-1246 00 KAIG3-RFI-CO-C-1246-00
KAIG3-RFI-CO-C-1247 00 KAIG3-RFI-CO-C-1247-00
KAIG3-RFI-CO-C-1249 00 KAIG3-RFI-CO-C-1249-00
KAIG3-RFI-CO-C-1248 00 KAIG3-RFI-CO-C-1248-00
KAIG3-RFI-CO-S-5176 00 KAIG3-RFI-CO-S-5176-00
KAIG3-RFI-CO-S-5175 00 KAIG3-RFI-CO-S-5175-00
KAIG3-RFI-PC-E-0286 00 KAIG3-RFI-PC-E-0286-00
KAIG3-RFI-DG-E-0285 00 KAIG3-RFI-DG-E-0285-00
KAIG3-RFI-DG-LC-0275 00 KAIG3-RFI-DG-LC-0275-00
KAIG3-RFI-PC-LC-0274 00 KAIG3-RFI-PC-LC-0274-00
KAIG3-RFI-MB-LC-0273 00 KAIG3-RFI-MB-LC-0273-00
KAIG3-RFI-SW-LS-0576 00 KAIG3-RFI-SW-LS-0576-00
KAIG3-RFI-SW-LS-0575 00 KAIG3-RFI-SW-LS-0575-00
KAIG3-RFI-SW-LS-0574 00 KAIG3-RFI-SW-LS-0574-00
KAIG3-RFI-SW-LS-0573 00 KAIG3-RFI-SW-LS-0573-00
KAIG3-RFI-SW-C-1241 00 KAIG3-RFI-SW-C-1241-00
KAIG3-RFI-SW-C-1240 00 KAIG3-RFI-SW-C-1240-00
KAIG3-RFI-SW-C-1239 00 KAIG3-RFI-SW-C-1239-00
KAIG3-RFI-SW-C-1238 00 KAIG3-RFI-SW-C-1238-00
KAIG3-RFI-SW-C-1233 00 KAIG3-RFI-SW-C-1233-00
KAIG3-RFI-MB-LC-0272 00 KAIG3-RFI-MB-LC-0272-00
KAIG3-RFI-TG-C-1237 00 KAIG3-RFI-TG-C-1237-00
KAIG3-RFI-CO-C-1234 00 KAIG3-RFI-CO-C-1234-00
KAIG3-RFI-CO-SU-1845 00 KAIG3-RFI-CO-SU-1845-00
KAIG3-RFI-CO-SU-1844 00 KAIG3-RFI-CO-SU-1844-00
KAIG3-RFI-CO-SU-1843 00 KAIG3-RFI-CO-SU-1843-00
KAIG3-RFI-CO-SU-1842 00 KAIG3-RFI-CO-SU-1842-00
KAIG3-RFI-CO-S-5173 00 KAIG3-RFI-CO-S-5173-00
KAIG3-RFI-CO-S-5172 00 KAIG3-RFI-CO-S-5172-00
KAIG3-RFI-CO-S-5171 00 KAIG3-RFI-CO-S-5171-00
KAIG3-RFI-CO-S-5170 00 KAIG3-RFI-CO-S-5170-00
KAIG3-RFI-CO-S-5167 00 KAIG3-RFI-CO-S-5167-00
KAIG3-RFI-CO-S-5166 00 KAIG3-RFI-CO-S-5166-00
KAIG3-RFI-CO-S-5165 00 KAIG3-RFI-CO-S-5165-00
KAIG3-RFI-SW-LS-0571 00 KAIG3-RFI-SW-LS-0571-00
KAIG3-RFI-CO-C-1235 00 KAIG3-RFI-CO-C-1235-00
KAIG3-RFI-CO-S-5174 00 KAIG3-RFI-CO-S-5174-00
KAIG3-RFI-CO-S-5105 01 KAIG3-RFI-CO-S-5105-01
KAIG3-RFI-CO-S-5104 01 KAIG3-RFI-CO-S-5104-01
KAIG3-RFI-WG-P-0151 00 KAIG3-RFI-WG-P-0151-00
KAIG3-RFI-AG-S-5169 00 KAIG3-RFI-AG-S-5169-00
KAIG3-RFI-ZG-S-5132 00 KAIG3-RFI-ZG-S-5132-00
KAIG3-RFI-DG-S-5168 00 KAIG3-RFI-DG-S-5168-00
KAIG3-RFI-MB-A-0631 00 KAIG3-RFI-MB-A-0631-00
KAIG3-RFI-WG-C-1217 00 KAIG3-RFI-WG-C-1217-00
KAIG3-RFI-WG-C-1216 00 KAIG3-RFI-WG-C-1216-00
KAIG3-RFI-ZG-C-1215 00 KAIG3-RFI-ZG-C-1215-00
KAIG3-RFI-SW-C-1188 01 KAIG3-RFI-SW-C-1188-01
KAIG3-RFI-SW-C-1171 01 KAIG3-RFI-SW-C-1171-01
KAIG3-RFI-SW-LS-0572 00 KAIG3-RFI-SW-LS-0572-00
KAIG3-RFI-SW-LS-0570 00 KAIG3-RFI-SW-LS-0570-00
KAIG3-RFI-SW-C-1232 00 KAIG3-RFI-SW-C-1232-00
KAIG3-RFI-SW-C-1231 00 KAIG3-RFI-SW-C-1231-00
KAIG3-RFI-SW-C-1213 00 KAIG3-RFI-SW-C-1213-00
KAIG3-RFI-SW-C-1225 00 KAIG3-RFI-SW-C-1225-00
KAIG3-RFI-SW-C-1224 00 KAIG3-RFI-SW-C-1224-00
KAIG3-RFI-SW-C-1223 00 KAIG3-RFI-SW-C-1223-00
KAIG3-RFI-SW-C-1222 00 KAIG3-RFI-SW-C-1222-00
KAIG3-RFI-SW-C-1221 00 KAIG3-RFI-SW-C-1221-00
KAIG3-RFI-SW-C-1220 00 KAIG3-RFI-SW-C-1220-00
KAIG3-RFI-SW-C-1219 00 KAIG3-RFI-SW-C-1219-00
KAIG3-RFI-SW-C-1218 00 KAIG3-RFI-SW-C-1218-00
KAIG3-RFI-SW-C-1187 00 KAIG3-RFI-SW-C-1187-00
KAIG3-RFI-SW-C-1186 00 KAIG3-RFI-SW-C-1186-00
KAIG3-RFI-MB-E-0284 00 KAIG3-RFI-MB-E-0284-00
KAIG3-RFI-MB-LC-0271 00 KAIG3-RFI-MB-LC-0271-00
KAIG3-RFI-MB-LC-0270 00 KAIG3-RFI-MB-LC-0270-00
KAIG3-RFI-CO-SS-0008 00 KAIG3-RFI-CO-SS-0008-00
KAIG3-RFI-CO-SU-1840 00 KAIG3-RFI-CO-SU-1840-00
KAIG3-RFI-CO-S-5164 00 KAIG3-RFI-CO-S-5164-00
KAIG3-RFI-CO-S-5161 00 KAIG3-RFI-CO-S-5161-00
KAIG3-RFI-CO-S-5160 00 KAIG3-RFI-CO-S-5160-00
KAIG3-RFI-CO-C-1208 00 KAIG3-RFI-CO-C-1208-00
KAIG3-RFI-CO-C-1207 00 KAIG3-RFI-CO-C-1207-00
KAIG3-RFI-CO-C-1206 00 KAIG3-RFI-CO-C-1206-00
KAIG3-RFI-CO-C-1058 00 KAIG3-RFI-CO-C-1058-00
KAIG3-RFI-CO-C-1057 00 KAIG3-RFI-CO-C-1057-00
KAIG3-RFI-SW-LS-0569 00 KAIG3-RFI-SW-LS-0569-00
KAIG3-RFI-SW-LS-0568 00 KAIG3-RFI-SW-LS-0568-00
KAIG3-RFI-SW-LS-0567 00 KAIG3-RFI-SW-LS-0567-00
KAIG3-RFI-SW-C-1212 00 KAIG3-RFI-SW-C-1212-00
KAIG3-RFI-SW-C-1211 00 KAIG3-RFI-SW-C-1211-00
KAIG3-RFI-SW-C-1210 00 KAIG3-RFI-SW-C-1210-00
KAIG3-RFI-SW-C-1209 00 KAIG3-RFI-SW-C-1209-00
KAIG3-RFI-SW-C-1205 00 KAIG3-RFI-SW-C-1205-00
KAIG3-RFI-SW-C-0922 01 KAIG3-RFI-SW-C-0922-01
KAIG3-RFI-PG-C-1045 00 KAIG3-RFI-PG-C-1045-00
KAIG3-RFI-PG-C-1044 00 KAIG3-RFI-PG-C-1044-00
KAIG3-RFI-SG-C-1214 00 KAIG3-RFI-SG-C-1214-00
KAIG3-RFI-MB-A-0630 00 KAIG3-RFI-MB-A-0630-00
KAIG3-RFI-SW-A-0629 00 KAIG3-RFI-SW-A-0629-00
KAIG3-RFI-SW-A-0628 00 KAIG3-RFI-SW-A-0628-00
KAIG3-RFI-SW-A-0627 00 KAIG3-RFI-SW-A-0627-00
KAIG3-RFI-SW-A-0626 00 KAIG3-RFI-SW-A-0626-00
KAIG3-RFI-AG-S-5159 00 KAIG3-RFI-AG-S-5159-00
KAIG3-RFI-MB-LC-0269 00 KAIG3-RFI-MB-LC-0269-00
KAIG3-RFI-SG-SU-1123 02 KAIG3-RFI-SG-SU-1123-02
KAIG3-RFI-ZG-S-5158 00 KAIG3-RFI-ZG-S-5158-00
KAIG3-RFI-ZG-S-5157 00 KAIG3-RFI-ZG-S-5157-00
KAIG3-RFI-ZG-S-5156 00 KAIG3-RFI-ZG-S-5156-00
KAIG3-RFI-ZG-S-5155 00 KAIG3-RFI-ZG-S-5155-00
KAIG3-RFI-PG-S-5151 00 KAIG3-RFI-PG-S-5151-00
KAIG3-RFI-MB-A-0625 00 KAIG3-RFI-MB-A-0625-00
KAIG3-RFI-PG-S-5074 01 KAIG3-RFI-PG-S-5074-01
KAIG3-RFI-CO-SU-1839 00 KAIG3-RFI-CO-SU-1839-00
KAIG3-RFI-CO-S-5154 00 KAIG3-RFI-CO-S-5154-00
KAIG3-RFI-CO-S-5153 00 KAIG3-RFI-CO-S-5153-00
KAIG3-RFI-CO-S-5152 00 KAIG3-RFI-CO-S-5152-00
KAIG3-RFI-CO-S-5144 00 KAIG3-RFI-CO-S-5144-00
KAIG3-RFI-CO-C-1201 00 KAIG3-RFI-CO-C-1201-00
KAIG3-RFI-CO-C-1060 00 KAIG3-RFI-CO-C-1060-00
KAIG3-RFI-CO-C-1001 00 KAIG3-RFI-CO-C-1001-00
KAIG3-RFI-DG-S-5150 00 KAIG3-RFI-DG-S-5150-00
KAIG3-RFI-MB-A-0624 00 KAIG3-RFI-MB-A-0624-00
KAIG3-RFI-MB-A-0623 00 KAIG3-RFI-MB-A-0623-00
KAIG3-RFI-ZG-S-5146 00 KAIG3-RFI-ZG-S-5146-00
KAIG3-RFI-ZG-SU-1837 00 KAIG3-RFI-ZG-SU-1837-00
KAIG3-RFI-SW-LS-0566 00 KAIG3-RFI-SW-LS-0566-00
KAIG3-RFI-SW-C-1204 00 KAIG3-RFI-SW-C-1204-00
KAIG3-RFI-SW-C-1203 00 KAIG3-RFI-SW-C-1203-00
KAIG3-RFI-SW-C-1202 00 KAIG3-RFI-SW-C-1202-00
KAIG3-RFI-SW-C-1178 00 KAIG3-RFI-SW-C-1178-00
KAIG3-RFI-SW-LS-0565 00 KAIG3-RFI-SW-LS-0565-00
KAIG3-RFI-SW-LS-0564 00 KAIG3-RFI-SW-LS-0564-00
KAIG3-RFI-SW-LS-0563 00 KAIG3-RFI-SW-LS-0563-00
KAIG3-RFI-SW-LS-0560 01 KAIG3-RFI-SW-LS-0560-01
KAIG3-RFI-SW-C-1198 00 KAIG3-RFI-SW-C-1198-00
KAIG3-RFI-SW-C-1197 00 KAIG3-RFI-SW-C-1197-00
KAIG3-RFI-CO-C-1200 00 KAIG3-RFI-CO-C-1200-00
KAIG3-RFI-CO-C-1199 00 KAIG3-RFI-CO-C-1199-00
KAIG3-RFI-MC-SU-1838 00 KAIG3-RFI-MC-SU-1838-00
KAIG3-RFI-MC-S-5149 00 KAIG3-RFI-MC-S-5149-00
KAIG3-RFI-MC-S-5148 00 KAIG3-RFI-MC-S-5148-00
KAIG3-RFI-MC-S-5147 00 KAIG3-RFI-MC-S-5147-00
KAIG3-RFI-CO-S-5145 00 KAIG3-RFI-CO-S-5145-00
KAIG3-RFI-CO-S-5143 00 KAIG3-RFI-CO-S-5143-00
KAIG3-RFI-CO-S-5142 00 KAIG3-RFI-CO-S-5142-00
KAIG3-RFI-CO-S-5030 01 KAIG3-RFI-CO-S-5030-01
KAIG3-RFI-CO-S-5029 01 KAIG3-RFI-CO-S-5029-01
KAIG3-RFI-CO-S-5141 00 KAIG3-RFI-CO-S-5141-00
KAIG3-RFI-CO-S-5140 00 KAIG3-RFI-CO-S-5140-00
KAIG3-RFI-CO-S-5139 00 KAIG3-RFI-CO-S-5139-00
KAIG3-RFI-CO-S-4749 00 KAIG3-RFI-CO-S-4749-00
KAIG3-RFI-SW-C-1185 00 KAIG3-RFI-SW-C-1185-00
KAIG3-RFI-SW-C-1184 00 KAIG3-RFI-SW-C-1184-00
KAIG3-RFI-SW-C-1183 00 KAIG3-RFI-SW-C-1183-00
KAIG3-RFI-SW-C-1182 00 KAIG3-RFI-SW-C-1182-00
KAIG3-RFI-SW-C-1181 00 KAIG3-RFI-SW-C-1181-00
KAIG3-RFI-SW-C-1180 00 KAIG3-RFI-SW-C-1180-00
KAIG3-RFI-SW-C-1179 00 KAIG3-RFI-SW-C-1179-00
KAIG3-RFI-SG-S-5131 00 KAIG3-RFI-SG-S-5131-00
KAIG3-RFI-DG-SU-1836 00 KAIG3-RFI-DG-SU-1836-00
KAIG3-RFI-DG-S-5138 00 KAIG3-RFI-DG-S-5138-00
KAIG3-RFI-WG-SU-1504 01 KAIG3-RFI-WG-SU-1504-01
KAIG3-RFI-DG-S-5130 00 KAIG3-RFI-DG-S-5130-00
KAIG3-RFI-DG-SU-1832 00 KAIG3-RFI-DG-SU-1832-00
KAIG3-RFI-WG-C-1170 00 KAIG3-RFI-WG-C-1170-00
KAIG3-RFI-SW-C-1177 00 KAIG3-RFI-SW-C-1177-00
KAIG3-RFI-SW-C-1176 00 KAIG3-RFI-SW-C-1176-00
KAIG3-RFI-CO-SU-1835 00 KAIG3-RFI-CO-SU-1835-00
KAIG3-RFI-CO-SU-1834 00 KAIG3-RFI-CO-SU-1834-00
KAIG3-RFI-SW-LS-0562 00 KAIG3-RFI-SW-LS-0562-00
KAIG3-RFI-SW-LS-0561 00 KAIG3-RFI-SW-LS-0561-00
KAIG3-RFI-PA-C-1196 00 KAIG3-RFI-PA-C-1196-00
KAIG3-RFI-CO-SU-1833 00 KAIG3-RFI-CO-SU-1833-00
KAIG3-RFI-PA-C-1195 00 KAIG3-RFI-PA-C-1195-00
KAIG3-RFI-PA-C-1194 00 KAIG3-RFI-PA-C-1194-00
KAIG3-RFI-SW-C-1193 00 KAIG3-RFI-SW-C-1193-00
KAIG3-RFI-CO-C-1174 00 KAIG3-RFI-CO-C-1174-00
KAIG3-RFI-CO-C-1173 00 KAIG3-RFI-CO-C-1173-00
KAIG3-RFI-CO-S-5136 00 KAIG3-RFI-CO-S-5136-00
KAIG3-RFI-CO-S-5135 00 KAIG3-RFI-CO-S-5135-00
KAIG3-RFI-SW-C-1192 00 KAIG3-RFI-SW-C-1192-00
KAIG3-RFI-CO-S-5134 00 KAIG3-RFI-CO-S-5134-00
KAIG3-RFI-CO-S-5133 00 KAIG3-RFI-CO-S-5133-00
KAIG3-RFI-CO-S-5137 00 KAIG3-RFI-CO-S-5137-00
KAIG3-RFI-SW-C-1191 00 KAIG3-RFI-SW-C-1191-00
KAIG3-RFI-SW-C-1190 00 KAIG3-RFI-SW-C-1190-00
KAIG3-RFI-SW-C-1189 00 KAIG3-RFI-SW-C-1189-00
KAIG3-RFI-SW-C-1188 00 KAIG3-RFI-SW-C-1188-00
KAIG3-RFI-SW-C-1175 00 KAIG3-RFI-SW-C-1175-00
KAIG3-RFI-PC-E-0283 00 KAIG3-RFI-PC-E-0283-00
KAIG3-RFI-SW-E-0282 00 KAIG3-RFI-SW-E-0282-00
KAIG3-RFI-CO-SU-1831 00 KAIG3-RFI-CO-SU-1831-00
KAIG3-RFI-MC-SU-1830 00 KAIG3-RFI-MC-SU-1830-00
KAIG3-RFI-CO-SU-1829 00 KAIG3-RFI-CO-SU-1829-00
KAIG3-RFI-CO-SU-1828 00 KAIG3-RFI-CO-SU-1828-00
KAIG3-RFI-CO-C-1172 00 KAIG3-RFI-CO-C-1172-00
KAIG3-RFI-CO-S-5128 00 KAIG3-RFI-CO-S-5128-00
KAIG3-RFI-CO-S-5127 00 KAIG3-RFI-CO-S-5127-00
KAIG3-RFI-MC-S-5126 00 KAIG3-RFI-MC-S-5126-00
KAIG3-RFI-MC-S-5125 00 KAIG3-RFI-MC-S-5125-00
KAIG3-RFI-MC-S-5124 00 KAIG3-RFI-MC-S-5124-00
KAIG3-RFI-CO-S-5123 00 KAIG3-RFI-CO-S-5123-00
KAIG3-RFI-CO-S-5122 00 KAIG3-RFI-CO-S-5122-00
KAIG3-RFI-CO-S-5121 00 KAIG3-RFI-CO-S-5121-00
KAIG3-RFI-CO-S-5120 00 KAIG3-RFI-CO-S-5120-00
KAIG3-RFI-CO-S-5119 00 KAIG3-RFI-CO-S-5119-00
KAIG3-RFI-CO-S-5115 00 KAIG3-RFI-CO-S-5115-00
KAIG3-RFI-CO-S-5101 00 KAIG3-RFI-CO-S-5101-00
KAIG3-RFI-CO-S-5118 00 KAIG3-RFI-CO-S-5118-00
KAIG3-RFI-CO-S-5117 00 KAIG3-RFI-CO-S-5117-00
KAIG3-RFI-SW-C-1171 00 KAIG3-RFI-SW-C-1171-00
KAIG3-RFI-CO-SS-0004 01 KAIG3-RFI-CO-SS-0004-01
KAIG3-RFI-CO-SU-1823 00 KAIG3-RFI-CO-SU-1823-00
KAIG3-RFI-CO-C-1165 00 KAIG3-RFI-CO-C-1165-00
KAIG3-RFI-CO-C-1164 00 KAIG3-RFI-CO-C-1164-00
KAIG3-RFI-CO-S-5103 00 KAIG3-RFI-CO-S-5103-00
KAIG3-RFI-CO-S-5102 00 KAIG3-RFI-CO-S-5102-00
KAIG3-RFI-CO-S-5061 00 KAIG3-RFI-CO-S-5061-00
KAIG3-RFI-CO-S-5060 00 KAIG3-RFI-CO-S-5060-00
KAIG3-RFI-CO-S-5059 00 KAIG3-RFI-CO-S-5059-00
KAIG3-RFI-SW-LS-0560 00 KAIG3-RFI-SW-LS-0560-00
KAIG3-RFI-SW-C-1169 00 KAIG3-RFI-SW-C-1169-00
KAIG3-RFI-SW-C-1168 00 KAIG3-RFI-SW-C-1168-00
KAIG3-RFI-SW-C-1167 00 KAIG3-RFI-SW-C-1167-00
KAIG3-RFI-PC-LC-0268 00 KAIG3-RFI-PC-LC-0268-00
KAIG3-RFI-PC-LC-0267 00 KAIG3-RFI-PC-LC-0267-00
KAIG3-RFI-SG-C-1055 00 KAIG3-RFI-SG-C-1055-00
KAIG3-RFI-MB-A-0622 00 KAIG3-RFI-MB-A-0622-00
KAIG3-RFI-ZG-SU-1824 00 KAIG3-RFI-ZG-SU-1824-00
KAIG3-RFI-ZG-S-5116 00 KAIG3-RFI-ZG-S-5116-00
KAIG3-RFI-PC-E-0281 00 KAIG3-RFI-PC-E-0281-00
KAIG3-RFI-ZG-E-0280 00 KAIG3-RFI-ZG-E-0280-00
KAIG3-RFI-SW-SU-1819 00 KAIG3-RFI-SW-SU-1819-00
KAIG3-RFI-SW-SU-1818 00 KAIG3-RFI-SW-SU-1818-00
KAIG3-RFI-SW-LS-0559 00 KAIG3-RFI-SW-LS-0559-00
KAIG3-RFI-SW-LS-0558 00 KAIG3-RFI-SW-LS-0558-00
KAIG3-RFI-SW-C-1163 00 KAIG3-RFI-SW-C-1163-00
KAIG3-RFI-SW-C-1162 00 KAIG3-RFI-SW-C-1162-00
KAIG3-RFI-SW-C-1161 00 KAIG3-RFI-SW-C-1161-00
KAIG3-RFI-CO-SU-1814 00 KAIG3-RFI-CO-SU-1814-00
KAIG3-RFI-CO-SU-1767 01 KAIG3-RFI-CO-SU-1767-01
KAIG3-RFI-MC-SU-1816 00 KAIG3-RFI-MC-SU-1816-00
KAIG3-RFI-CO-SU-1815 00 KAIG3-RFI-CO-SU-1815-00
KAIG3-RFI-CO-SU-1717 02 KAIG3-RFI-CO-SU-1717-02
KAIG3-RFI-MC-S-5109 00 KAIG3-RFI-MC-S-5109-00
KAIG3-RFI-MC-S-5108 00 KAIG3-RFI-MC-S-5108-00
KAIG3-RFI-MC-S-5107 00 KAIG3-RFI-MC-S-5107-00
KAIG3-RFI-CO-S-5106 00 KAIG3-RFI-CO-S-5106-00
KAIG3-RFI-CO-S-5105 00 KAIG3-RFI-CO-S-5105-00
KAIG3-RFI-CO-S-5104 00 KAIG3-RFI-CO-S-5104-00
KAIG3-RFI-CO-S-5093 00 KAIG3-RFI-CO-S-5093-00
KAIG3-RFI-CO-S-5113 00 KAIG3-RFI-CO-S-5113-00
KAIG3-RFI-CO-S-5112 00 KAIG3-RFI-CO-S-5112-00
KAIG3-RFI-CO-S-5111 00 KAIG3-RFI-CO-S-5111-00
KAIG3-RFI-DG-S-5114 00 KAIG3-RFI-DG-S-5114-00
KAIG3-RFI-DG-SU-1820 00 KAIG3-RFI-DG-SU-1820-00
KAIG3-RFI-MC-S-5087 00 KAIG3-RFI-MC-S-5087-00
KAIG3-RFI-MB-A-0621 00 KAIG3-RFI-MB-A-0621-00
KAIG3-RFI-CO-SS-0007 00 KAIG3-RFI-CO-SS-0007-00
KAIG3-RFI-PC-E-0279 00 KAIG3-RFI-PC-E-0279-00
KAIG3-RFI-PC-LC-0266 00 KAIG3-RFI-PC-LC-0266-00
KAIG3-RFI-ZG-S-5082 00 KAIG3-RFI-ZG-S-5082-00
KAIG3-RFI-PC-LC-0265 00 KAIG3-RFI-PC-LC-0265-00
KAIG3-RFI-PC-LC-0264 00 KAIG3-RFI-PC-LC-0264-00
KAIG3-RFI-ZG-S-5110 00 KAIG3-RFI-ZG-S-5110-00
KAIG3-RFI-ZG-SU-1817 00 KAIG3-RFI-ZG-SU-1817-00
KAIG3-RFI-CO-SS-0006 00 KAIG3-RFI-CO-SS-0006-00
KAIG3-RFI-CO-SS-0005 00 KAIG3-RFI-CO-SS-0005-00
KAIG3-RFI-CO-SU-1813 00 KAIG3-RFI-CO-SU-1813-00
KAIG3-RFI-CO-SU-1812 00 KAIG3-RFI-CO-SU-1812-00
KAIG3-RFI-CO-SU-1811 00 KAIG3-RFI-CO-SU-1811-00
KAIG3-RFI-CO-SU-1810 00 KAIG3-RFI-CO-SU-1810-00
KAIG3-RFI-MC-SU-1809 00 KAIG3-RFI-MC-SU-1809-00
KAIG3-RFI-CO-S-5100 00 KAIG3-RFI-CO-S-5100-00
KAIG3-RFI-CO-S-5086 00 KAIG3-RFI-CO-S-5086-00
KAIG3-RFI-CO-S-5085 00 KAIG3-RFI-CO-S-5085-00
KAIG3-RFI-PA-C-1150 00 KAIG3-RFI-PA-C-1150-00
KAIG3-RFI-PA-C-1149 00 KAIG3-RFI-PA-C-1149-00
KAIG3-RFI-CO-S-5099 00 KAIG3-RFI-CO-S-5099-00
KAIG3-RFI-PA-C-1148 00 KAIG3-RFI-PA-C-1148-00
KAIG3-RFI-CO-S-5098 00 KAIG3-RFI-CO-S-5098-00
KAIG3-RFI-PA-C-1147 00 KAIG3-RFI-PA-C-1147-00
KAIG3-RFI-PA-C-1146 00 KAIG3-RFI-PA-C-1146-00
KAIG3-RFI-CO-S-5092 00 KAIG3-RFI-CO-S-5092-00
KAIG3-RFI-PA-C-1145 00 KAIG3-RFI-PA-C-1145-00
KAIG3-RFI-CO-S-5091 00 KAIG3-RFI-CO-S-5091-00
KAIG3-RFI-PA-C-1144 00 KAIG3-RFI-PA-C-1144-00
KAIG3-RFI-PA-C-1143 00 KAIG3-RFI-PA-C-1143-00
KAIG3-RFI-PA-C-1142 00 KAIG3-RFI-PA-C-1142-00
KAIG3-RFI-MC-S-5089 00 KAIG3-RFI-MC-S-5089-00
KAIG3-RFI-PA-C-1141 00 KAIG3-RFI-PA-C-1141-00
KAIG3-RFI-PA-C-1140 00 KAIG3-RFI-PA-C-1140-00
KAIG3-RFI-PA-C-1139 00 KAIG3-RFI-PA-C-1139-00
KAIG3-RFI-MC-S-5088 00 KAIG3-RFI-MC-S-5088-00
KAIG3-RFI-PA-C-1138 00 KAIG3-RFI-PA-C-1138-00
KAIG3-RFI-CO-S-4864 01 KAIG3-RFI-CO-S-4864-01
KAIG3-RFI-PA-C-1137 00 KAIG3-RFI-PA-C-1137-00
KAIG3-RFI-PA-C-1136 00 KAIG3-RFI-PA-C-1136-00
KAIG3-RFI-CO-S-4990 01 KAIG3-RFI-CO-S-4990-01
KAIG3-RFI-PA-C-1135 00 KAIG3-RFI-PA-C-1135-00
KAIG3-RFI-MB-S-5097 00 KAIG3-RFI-MB-S-5097-00
KAIG3-RFI-MB-S-5096 00 KAIG3-RFI-MB-S-5096-00
KAIG3-RFI-ZG-S-5095 00 KAIG3-RFI-ZG-S-5095-00
KAIG3-RFI-AG-C-1054 00 KAIG3-RFI-AG-C-1054-00
KAIG3-RFI-AG-C-1053 00 KAIG3-RFI-AG-C-1053-00
KAIG3-RFI-DG-S-5094 00 KAIG3-RFI-DG-S-5094-00
KAIG3-RFI-SW-A-0620 00 KAIG3-RFI-SW-A-0620-00
KAIG3-RFI-PG-S-5049 00 KAIG3-RFI-PG-S-5049-00
KAIG3-RFI-SW-C-1156 00 KAIG3-RFI-SW-C-1156-00
KAIG3-RFI-SW-C-1155 00 KAIG3-RFI-SW-C-1155-00
KAIG3-RFI-SW-C-1154 00 KAIG3-RFI-SW-C-1154-00
KAIG3-RFI-SW-C-1153 00 KAIG3-RFI-SW-C-1153-00
KAIG3-RFI-SW-C-1152 00 KAIG3-RFI-SW-C-1152-00
KAIG3-RFI-SW-C-1151 00 KAIG3-RFI-SW-C-1151-00
KAIG3-RFI-CO-S-4998 01 KAIG3-RFI-CO-S-4998-01
KAIG3-RFI-CO-S-4997 01 KAIG3-RFI-CO-S-4997-01
KAIG3-RFI-CO-S-4971 01 KAIG3-RFI-CO-S-4971-01
KAIG3-RFI-CO-S-4966 01 KAIG3-RFI-CO-S-4966-01
KAIG3-RFI-CO-S-4953 01 KAIG3-RFI-CO-S-4953-01
KAIG3-RFI-CO-S-4952 01 KAIG3-RFI-CO-S-4952-01
KAIG3-RFI-CO-S-4926 01 KAIG3-RFI-CO-S-4926-01
KAIG3-RFI-CO-S-4925 01 KAIG3-RFI-CO-S-4925-01
KAIG3-RFI-CO-S-4922 01 KAIG3-RFI-CO-S-4922-01
KAIG3-RFI-SW-A-0619 00 KAIG3-RFI-SW-A-0619-00
KAIG3-RFI-SW-A-0618 00 KAIG3-RFI-SW-A-0618-00
KAIG3-RFI-SW-A-0617 00 KAIG3-RFI-SW-A-0617-00
KAIG3-RFI-MB-S-5084 00 KAIG3-RFI-MB-S-5084-00
KAIG3-RFI-MB-S-5083 00 KAIG3-RFI-MB-S-5083-00
KAIG3-RFI-AG-S-5081 00 KAIG3-RFI-AG-S-5081-00
KAIG3-RFI-ZG-S-5080 00 KAIG3-RFI-ZG-S-5080-00
KAIG3-RFI-ZG-S-5079 00 KAIG3-RFI-ZG-S-5079-00
KAIG3-RFI-ZG-S-5078 00 KAIG3-RFI-ZG-S-5078-00
KAIG3-RFI-ZG-S-5077 00 KAIG3-RFI-ZG-S-5077-00
KAIG3-RFI-SW-LS-0557 00 KAIG3-RFI-SW-LS-0557-00
KAIG3-RFI-SW-C-1132 00 KAIG3-RFI-SW-C-1132-00
KAIG3-RFI-SW-C-1131 00 KAIG3-RFI-SW-C-1131-00
KAIG3-RFI-PA-C-1130 00 KAIG3-RFI-PA-C-1130-00
KAIG3-RFI-PA-C-1129 00 KAIG3-RFI-PA-C-1129-00
KAIG3-RFI-PA-C-1128 00 KAIG3-RFI-PA-C-1128-00
KAIG3-RFI-PA-C-1127 00 KAIG3-RFI-PA-C-1127-00
KAIG3-RFI-PA-C-1126 00 KAIG3-RFI-PA-C-1126-00
KAIG3-RFI-PA-C-1125 00 KAIG3-RFI-PA-C-1125-00
KAIG3-RFI-PA-C-1124 00 KAIG3-RFI-PA-C-1124-00
KAIG3-RFI-PA-C-1123 00 KAIG3-RFI-PA-C-1123-00
KAIG3-RFI-PA-C-1122 00 KAIG3-RFI-PA-C-1122-00
KAIG3-RFI-PA-C-1121 00 KAIG3-RFI-PA-C-1121-00
KAIG3-RFI-PA-C-1110 00 KAIG3-RFI-PA-C-1110-00
KAIG3-RFI-PA-C-1109 00 KAIG3-RFI-PA-C-1109-00
KAIG3-RFI-PA-C-1108 00 KAIG3-RFI-PA-C-1108-00
KAIG3-RFI-CO-S-4921 01 KAIG3-RFI-CO-S-4921-01
KAIG3-RFI-SW-C-1134 00 KAIG3-RFI-SW-C-1134-00
KAIG3-RFI-SW-C-1133 00 KAIG3-RFI-SW-C-1133-00
KAIG3-RFI-PC-E-0278 00 KAIG3-RFI-PC-E-0278-00
KAIG3-RFI-ZG-E-0277 00 KAIG3-RFI-ZG-E-0277-00
KAIG3-RFI-MB-A-0616 00 KAIG3-RFI-MB-A-0616-00
KAIG3-RFI-WG-C-1052 00 KAIG3-RFI-WG-C-1052-00
KAIG3-RFI-WG-C-1051 00 KAIG3-RFI-WG-C-1051-00
KAIG3-RFI-WG-C-1050 00 KAIG3-RFI-WG-C-1050-00
KAIG3-RFI-WG-C-1049 00 KAIG3-RFI-WG-C-1049-00
KAIG3-RFI-SW-C-1107 00 KAIG3-RFI-SW-C-1107-00
KAIG3-RFI-SW-C-1084 00 KAIG3-RFI-SW-C-1084-00
KAIG3-RFI-SW-C-1083 00 KAIG3-RFI-SW-C-1083-00
KAIG3-RFI-SW-C-1082 00 KAIG3-RFI-SW-C-1082-00
KAIG3-RFI-SW-C-1081 00 KAIG3-RFI-SW-C-1081-00
KAIG3-RFI-SW-C-1080 00 KAIG3-RFI-SW-C-1080-00
KAIG3-RFI-SW-C-1079 00 KAIG3-RFI-SW-C-1079-00
KAIG3-RFI-SW-C-0970 00 KAIG3-RFI-SW-C-0970-00
KAIG3-RFI-SW-C-0969 00 KAIG3-RFI-SW-C-0969-00
KAIG3-RFI-SW-C-1120 00 KAIG3-RFI-SW-C-1120-00
KAIG3-RFI-SW-C-1119 00 KAIG3-RFI-SW-C-1119-00
KAIG3-RFI-SW-C-1118 00 KAIG3-RFI-SW-C-1118-00
KAIG3-RFI-SW-C-1117 00 KAIG3-RFI-SW-C-1117-00
KAIG3-RFI-SW-C-1116 00 KAIG3-RFI-SW-C-1116-00
KAIG3-RFI-SW-C-1115 00 KAIG3-RFI-SW-C-1115-00
KAIG3-RFI-SW-C-1114 00 KAIG3-RFI-SW-C-1114-00
KAIG3-RFI-SW-C-1113 00 KAIG3-RFI-SW-C-1113-00
KAIG3-RFI-CO-S-5076 00 KAIG3-RFI-CO-S-5076-00
KAIG3-RFI-CO-S-5075 00 KAIG3-RFI-CO-S-5075-00
KAIG3-RFI-CO-S-5071 00 KAIG3-RFI-CO-S-5071-00
KAIG3-RFI-CO-S-5070 00 KAIG3-RFI-CO-S-5070-00
KAIG3-RFI-CO-S-4950 01 KAIG3-RFI-CO-S-4950-01
KAIG3-RFI-CO-S-4949 01 KAIG3-RFI-CO-S-4949-01
KAIG3-RFI-CO-S-4948 01 KAIG3-RFI-CO-S-4948-01
KAIG3-RFI-CO-SS-0004 00 KAIG3-RFI-CO-SS-0004-00
KAIG3-RFI-CO-SU-1808 00 KAIG3-RFI-CO-SU-1808-00
KAIG3-RFI-CO-SU-1807 00 KAIG3-RFI-CO-SU-1807-00
KAIG3-RFI-CO-C-1111 00 KAIG3-RFI-CO-C-1111-00
KAIG3-RFI-CO-C-1056 00 KAIG3-RFI-CO-C-1056-00
KAIG3-RFI-DG-LC-0263 00 KAIG3-RFI-DG-LC-0263-00
KAIG3-RFI-DG-LC-0262 00 KAIG3-RFI-DG-LC-0262-00
KAIG3-RFI-DG-LC-0261 00 KAIG3-RFI-DG-LC-0261-00
KAIG3-RFI-DG-E-0276 00 KAIG3-RFI-DG-E-0276-00
KAIG3-RFI-DG-E-0275 00 KAIG3-RFI-DG-E-0275-00
KAIG3-RFI-SW-C-1078 00 KAIG3-RFI-SW-C-1078-00
KAIG3-RFI-SW-C-1077 00 KAIG3-RFI-SW-C-1077-00
KAIG3-RFI-PA-C-1076 00 KAIG3-RFI-PA-C-1076-00
KAIG3-RFI-PA-C-1075 00 KAIG3-RFI-PA-C-1075-00
KAIG3-RFI-PA-C-1074 00 KAIG3-RFI-PA-C-1074-00
KAIG3-RFI-PA-C-1040 00 KAIG3-RFI-PA-C-1040-00
KAIG3-RFI-PA-C-1039 00 KAIG3-RFI-PA-C-1039-00
KAIG3-RFI-PA-C-1038 00 KAIG3-RFI-PA-C-1038-00
KAIG3-RFI-PA-C-1037 00 KAIG3-RFI-PA-C-1037-00
KAIG3-RFI-PA-C-1036 00 KAIG3-RFI-PA-C-1036-00
KAIG3-RFI-PA-C-1035 00 KAIG3-RFI-PA-C-1035-00
KAIG3-RFI-PA-C-1034 00 KAIG3-RFI-PA-C-1034-00
KAIG3-RFI-PA-C-1033 00 KAIG3-RFI-PA-C-1033-00
KAIG3-RFI-PA-C-1032 00 KAIG3-RFI-PA-C-1032-00
KAIG3-RFI-PA-C-1031 00 KAIG3-RFI-PA-C-1031-00
KAIG3-RFI-PA-C-1030 00 KAIG3-RFI-PA-C-1030-00
KAIG3-RFI-PA-C-1029 00 KAIG3-RFI-PA-C-1029-00
KAIG3-RFI-PA-C-1028 00 KAIG3-RFI-PA-C-1028-00
KAIG3-RFI-SW-LS-0556 00 KAIG3-RFI-SW-LS-0556-00
KAIG3-RFI-PG-S-5074 00 KAIG3-RFI-PG-S-5074-00
KAIG3-RFI-DG-SU-1806 00 KAIG3-RFI-DG-SU-1806-00
KAIG3-RFI-DG-S-5073 00 KAIG3-RFI-DG-S-5073-00
KAIG3-RFI-ZG-S-5072 00 KAIG3-RFI-ZG-S-5072-00
KAIG3-RFI-ZG-SU-1805 00 KAIG3-RFI-ZG-SU-1805-00
KAIG3-RFI-SG-SU-1123 01 KAIG3-RFI-SG-SU-1123-01
KAIG3-RFI-SG-SU-1119 02 KAIG3-RFI-SG-SU-1119-02
KAIG3-RFI-SG-C-1048 00 KAIG3-RFI-SG-C-1048-00
KAIG3-RFI-SG-C-1047 00 KAIG3-RFI-SG-C-1047-00
KAIG3-RFI-SG-C-1046 00 KAIG3-RFI-SG-C-1046-00
KAIG3-RFI-CO-SS-0003 00 KAIG3-RFI-CO-SS-0003-00
KAIG3-RFI-CO-SU-1803 00 KAIG3-RFI-CO-SU-1803-00
KAIG3-RFI-CO-SU-1804 00 KAIG3-RFI-CO-SU-1804-00
KAIG3-RFI-CO-SU-1796 00 KAIG3-RFI-CO-SU-1796-00
KAIG3-RFI-CO-SU-1795 00 KAIG3-RFI-CO-SU-1795-00
KAIG3-RFI-CO-S-4969 01 KAIG3-RFI-CO-S-4969-01
KAIG3-RFI-CO-S-4968 01 KAIG3-RFI-CO-S-4968-01
KAIG3-RFI-CO-S-4967 01 KAIG3-RFI-CO-S-4967-01
KAIG3-RFI-CO-S-5069 00 KAIG3-RFI-CO-S-5069-00
KAIG3-RFI-CO-S-5068 00 KAIG3-RFI-CO-S-5068-00
KAIG3-RFI-CO-S-5067 00 KAIG3-RFI-CO-S-5067-00
KAIG3-RFI-CO-S-5066 00 KAIG3-RFI-CO-S-5066-00
KAIG3-RFI-MB-A-0615 00 KAIG3-RFI-MB-A-0615-00
KAIG3-RFI-CO-S-5065 00 KAIG3-RFI-CO-S-5065-00
KAIG3-RFI-CO-S-5063 00 KAIG3-RFI-CO-S-5063-00
KAIG3-RFI-WG-C-1043 00 KAIG3-RFI-WG-C-1043-00
KAIG3-RFI-WG-C-1042 00 KAIG3-RFI-WG-C-1042-00
KAIG3-RFI-WG-C-1041 00 KAIG3-RFI-WG-C-1041-00
KAIG3-RFI-WG-C-1026 00 KAIG3-RFI-WG-C-1026-00
KAIG3-RFI-CO-S-5062 00 KAIG3-RFI-CO-S-5062-00
KAIG3-RFI-WG-C-1025 00 KAIG3-RFI-WG-C-1025-00
KAIG3-RFI-WG-C-1024 00 KAIG3-RFI-WG-C-1024-00
KAIG3-RFI-PG-C-1023 00 KAIG3-RFI-PG-C-1023-00
KAIG3-RFI-PG-C-1022 00 KAIG3-RFI-PG-C-1022-00
KAIG3-RFI-WG-C-1021 00 KAIG3-RFI-WG-C-1021-00
KAIG3-RFI-PA-C-1106 00 KAIG3-RFI-PA-C-1106-00
KAIG3-RFI-PA-C-1105 00 KAIG3-RFI-PA-C-1105-00
KAIG3-RFI-PA-C-1104 00 KAIG3-RFI-PA-C-1104-00
KAIG3-RFI-PA-C-1103 00 KAIG3-RFI-PA-C-1103-00
KAIG3-RFI-PA-C-1102 00 KAIG3-RFI-PA-C-1102-00
KAIG3-RFI-PA-C-1101 00 KAIG3-RFI-PA-C-1101-00
KAIG3-RFI-PA-C-1100 00 KAIG3-RFI-PA-C-1100-00
KAIG3-RFI-PA-C-1099 00 KAIG3-RFI-PA-C-1099-00
KAIG3-RFI-PA-C-1098 00 KAIG3-RFI-PA-C-1098-00
KAIG3-RFI-PA-C-1097 00 KAIG3-RFI-PA-C-1097-00
KAIG3-RFI-PA-C-1096 00 KAIG3-RFI-PA-C-1096-00
KAIG3-RFI-PA-C-1095 00 KAIG3-RFI-PA-C-1095-00
KAIG3-RFI-PA-C-1094 00 KAIG3-RFI-PA-C-1094-00
KAIG3-RFI-PA-C-1093 00 KAIG3-RFI-PA-C-1093-00
KAIG3-RFI-PA-C-1090 00 KAIG3-RFI-PA-C-1090-00
KAIG3-RFI-PA-C-1089 00 KAIG3-RFI-PA-C-1089-00
KAIG3-RFI-PA-C-1088 00 KAIG3-RFI-PA-C-1088-00
KAIG3-RFI-PA-C-1087 00 KAIG3-RFI-PA-C-1087-00
KAIG3-RFI-PA-C-1086 00 KAIG3-RFI-PA-C-1086-00
KAIG3-RFI-PA-C-1085 00 KAIG3-RFI-PA-C-1085-00
KAIG3-RFI-SW-C-1027 00 KAIG3-RFI-SW-C-1027-00
KAIG3-RFI-SW-C-1012 00 KAIG3-RFI-SW-C-1012-00
KAIG3-RFI-SW-LS-0555 00 KAIG3-RFI-SW-LS-0555-00
KAIG3-RFI-SW-C-0313 01 KAIG3-RFI-SW-C-0313-01
KAIG3-RFI-SW-C-1092 00 KAIG3-RFI-SW-C-1092-00
KAIG3-RFI-SW-C-1091 00 KAIG3-RFI-SW-C-1091-00
KAIG3-RFI-SW-C-1073 00 KAIG3-RFI-SW-C-1073-00
KAIG3-RFI-SW-C-1072 00 KAIG3-RFI-SW-C-1072-00
KAIG3-RFI-SW-C-1071 00 KAIG3-RFI-SW-C-1071-00
KAIG3-RFI-SW-C-1070 00 KAIG3-RFI-SW-C-1070-00
KAIG3-RFI-SW-C-1069 00 KAIG3-RFI-SW-C-1069-00
KAIG3-RFI-SW-C-1068 00 KAIG3-RFI-SW-C-1068-00
KAIG3-RFI-SW-C-1067 00 KAIG3-RFI-SW-C-1067-00
KAIG3-RFI-SW-C-1066 00 KAIG3-RFI-SW-C-1066-00
KAIG3-RFI-SW-C-1065 00 KAIG3-RFI-SW-C-1065-00
KAIG3-RFI-SW-C-1064 00 KAIG3-RFI-SW-C-1064-00
KAIG3-RFI-SW-C-1063 00 KAIG3-RFI-SW-C-1063-00
KAIG3-RFI-SW-C-1062 00 KAIG3-RFI-SW-C-1062-00
KAIG3-RFI-MB-E-0274 00 KAIG3-RFI-MB-E-0274-00
KAIG3-RFI-SW-C-0999 00 KAIG3-RFI-SW-C-0999-00
KAIG3-RFI-MC-SU-1794 00 KAIG3-RFI-MC-SU-1794-00
KAIG3-RFI-CO-S-5058 00 KAIG3-RFI-CO-S-5058-00
KAIG3-RFI-CO-S-5057 00 KAIG3-RFI-CO-S-5057-00
KAIG3-RFI-CO-S-5056 00 KAIG3-RFI-CO-S-5056-00
KAIG3-RFI-CO-S-5055 00 KAIG3-RFI-CO-S-5055-00
KAIG3-RFI-MC-S-5054 00 KAIG3-RFI-MC-S-5054-00
KAIG3-RFI-MC-S-5053 00 KAIG3-RFI-MC-S-5053-00
KAIG3-RFI-MC-S-5052 00 KAIG3-RFI-MC-S-5052-00
KAIG3-RFI-WG-C-1020 00 KAIG3-RFI-WG-C-1020-00
KAIG3-RFI-WG-C-1019 00 KAIG3-RFI-WG-C-1019-00
KAIG3-RFI-WG-C-1018 00 KAIG3-RFI-WG-C-1018-00
KAIG3-RFI-WG-C-1017 00 KAIG3-RFI-WG-C-1017-00
KAIG3-RFI-WG-C-1016 00 KAIG3-RFI-WG-C-1016-00
KAIG3-RFI-WG-LS-0554 00 KAIG3-RFI-WG-LS-0554-00
KAIG3-RFI-WG-LS-0553 00 KAIG3-RFI-WG-LS-0553-00
KAIG3-RFI-WG-LS-0552 00 KAIG3-RFI-WG-LS-0552-00
KAIG3-RFI-WG-LS-0551 00 KAIG3-RFI-WG-LS-0551-00
KAIG3-RFI-WG-LS-0550 00 KAIG3-RFI-WG-LS-0550-00
KAIG3-RFI-WG-LS-0549 00 KAIG3-RFI-WG-LS-0549-00
KAIG3-RFI-WG-C-1005 00 KAIG3-RFI-WG-C-1005-00
KAIG3-RFI-WG-C-1004 00 KAIG3-RFI-WG-C-1004-00
KAIG3-RFI-WG-C-1003 00 KAIG3-RFI-WG-C-1003-00
KAIG3-RFI-AG-S-5048 00 KAIG3-RFI-AG-S-5048-00
KAIG3-RFI-SG-S-5047 00 KAIG3-RFI-SG-S-5047-00
KAIG3-RFI-WG-SU-1347 01 KAIG3-RFI-WG-SU-1347-01
KAIG3-RFI-WG-SU-1346 01 KAIG3-RFI-WG-SU-1346-01
KAIG3-RFI-SW-LS-0548 00 KAIG3-RFI-SW-LS-0548-00
KAIG3-RFI-SW-LS-0547 00 KAIG3-RFI-SW-LS-0547-00
KAIG3-RFI-SW-LS-0546 00 KAIG3-RFI-SW-LS-0546-00
KAIG3-RFI-SW-C-1016 00 KAIG3-RFI-SW-C-1016-00
KAIG3-RFI-SW-C-1015 00 KAIG3-RFI-SW-C-1015-00
KAIG3-RFI-SW-C-1014 00 KAIG3-RFI-SW-C-1014-00
KAIG3-RFI-SW-C-1013 00 KAIG3-RFI-SW-C-1013-00
KAIG3-RFI-SW-C-1011 00 KAIG3-RFI-SW-C-1011-00
KAIG3-RFI-SW-C-1010 00 KAIG3-RFI-SW-C-1010-00
KAIG3-RFI-SW-C-1009 00 KAIG3-RFI-SW-C-1009-00
KAIG3-RFI-SW-C-1008 00 KAIG3-RFI-SW-C-1008-00
KAIG3-RFI-SW-C-1007 00 KAIG3-RFI-SW-C-1007-00
KAIG3-RFI-SW-C-1006 00 KAIG3-RFI-SW-C-1006-00
KAIG3-RFI-SW-C-1000 00 KAIG3-RFI-SW-C-1000-00
KAIG3-RFI-PC-LC-0260 00 KAIG3-RFI-PC-LC-0260-00
KAIG3-RFI-PC-LC-0259 00 KAIG3-RFI-PC-LC-0259-00
KAIG3-RFI-PC-LC-0258 00 KAIG3-RFI-PC-LC-0258-00
KAIG3-RFI-PC-E-0273 00 KAIG3-RFI-PC-E-0273-00
KAIG3-RFI-WG-C-0985 00 KAIG3-RFI-WG-C-0985-00
KAIG3-RFI-WG-C-0984 00 KAIG3-RFI-WG-C-0984-00
KAIG3-RFI-WG-C-0983 00 KAIG3-RFI-WG-C-0983-00
KAIG3-RFI-WG-C-0982 00 KAIG3-RFI-WG-C-0982-00
KAIG3-RFI-WG-C-0981 00 KAIG3-RFI-WG-C-0981-00
KAIG3-RFI-WG-C-0971 00 KAIG3-RFI-WG-C-0971-00
KAIG3-RFI-SW-C-0998 00 KAIG3-RFI-SW-C-0998-00
KAIG3-RFI-SW-C-0997 00 KAIG3-RFI-SW-C-0997-00
KAIG3-RFI-SW-C-0996 00 KAIG3-RFI-SW-C-0996-00
KAIG3-RFI-SW-C-0995 00 KAIG3-RFI-SW-C-0995-00
KAIG3-RFI-SW-C-0994 00 KAIG3-RFI-SW-C-0994-00
KAIG3-RFI-SW-C-0993 00 KAIG3-RFI-SW-C-0993-00
KAIG3-RFI-SW-C-0992 00 KAIG3-RFI-SW-C-0992-00
KAIG3-RFI-SW-C-0991 00 KAIG3-RFI-SW-C-0991-00
KAIG3-RFI-PA-C-0990 00 KAIG3-RFI-PA-C-0990-00
KAIG3-RFI-PA-C-0989 00 KAIG3-RFI-PA-C-0989-00
KAIG3-RFI-SW-C-0988 00 KAIG3-RFI-SW-C-0988-00
KAIG3-RFI-SW-C-0987 00 KAIG3-RFI-SW-C-0987-00
KAIG3-RFI-SW-C-0986 00 KAIG3-RFI-SW-C-0986-00
KAIG3-RFI-SW-C-0980 00 KAIG3-RFI-SW-C-0980-00
KAIG3-RFI-SW-C-0979 00 KAIG3-RFI-SW-C-0979-00
KAIG3-RFI-SW-C-0978 00 KAIG3-RFI-SW-C-0978-00
KAIG3-RFI-SW-LS-0545 00 KAIG3-RFI-SW-LS-0545-00
KAIG3-RFI-PA-S-2641 01 KAIG3-RFI-PA-S-2641-01
KAIG3-RFI-SW-C-0968 00 KAIG3-RFI-SW-C-0968-00
KAIG3-RFI-SW-C-0967 00 KAIG3-RFI-SW-C-0967-00
KAIG3-RFI-CO-SU-1793 00 KAIG3-RFI-CO-SU-1793-00
KAIG3-RFI-CO-SU-1792 00 KAIG3-RFI-CO-SU-1792-00
KAIG3-RFI-CO-SU-1791 00 KAIG3-RFI-CO-SU-1791-00
KAIG3-RFI-CO-SU-1790 00 KAIG3-RFI-CO-SU-1790-00
KAIG3-RFI-CO-C-1002 00 KAIG3-RFI-CO-C-1002-00
KAIG3-RFI-CO-S-5051 00 KAIG3-RFI-CO-S-5051-00
KAIG3-RFI-CO-S-5050 00 KAIG3-RFI-CO-S-5050-00
KAIG3-RFI-CO-S-5046 00 KAIG3-RFI-CO-S-5046-00
KAIG3-RFI-CO-S-5045 00 KAIG3-RFI-CO-S-5045-00
KAIG3-RFI-CO-S-5044 00 KAIG3-RFI-CO-S-5044-00
KAIG3-RFI-CO-S-5043 00 KAIG3-RFI-CO-S-5043-00
KAIG3-RFI-CO-S-5042 00 KAIG3-RFI-CO-S-5042-00
KAIG3-RFI-CO-S-5041 00 KAIG3-RFI-CO-S-5041-00
KAIG3-RFI-CO-S-5040 00 KAIG3-RFI-CO-S-5040-00
KAIG3-RFI-CO-S-5039 00 KAIG3-RFI-CO-S-5039-00
KAIG3-RFI-CO-S-5038 00 KAIG3-RFI-CO-S-5038-00
KAIG3-RFI-CO-S-5037 00 KAIG3-RFI-CO-S-5037-00
KAIG3-RFI-CO-S-5036 00 KAIG3-RFI-CO-S-5036-00
KAIG3-RFI-CO-S-5035 00 KAIG3-RFI-CO-S-5035-00
KAIG3-RFI-CO-S-5034 00 KAIG3-RFI-CO-S-5034-00
KAIG3-RFI-CO-S-5033 00 KAIG3-RFI-CO-S-5033-00
KAIG3-RFI-SW-C-0964 00 KAIG3-RFI-SW-C-0964-00
KAIG3-RFI-SW-C-0977 00 KAIG3-RFI-SW-C-0977-00
KAIG3-RFI-SW-C-0976 00 KAIG3-RFI-SW-C-0976-00
KAIG3-RFI-SW-C-0975 00 KAIG3-RFI-SW-C-0975-00
KAIG3-RFI-SW-C-0974 00 KAIG3-RFI-SW-C-0974-00
KAIG3-RFI-PA-C-0973 00 KAIG3-RFI-PA-C-0973-00
KAIG3-RFI-PA-C-0972 00 KAIG3-RFI-PA-C-0972-00
KAIG3-RFI-PA-C-0905 00 KAIG3-RFI-PA-C-0905-00
KAIG3-RFI-SW-LS-0544 00 KAIG3-RFI-SW-LS-0544-00
KAIG3-RFI-SW-LS-0543 00 KAIG3-RFI-SW-LS-0543-00
KAIG3-RFI-SW-LS-0542 00 KAIG3-RFI-SW-LS-0542-00
KAIG3-RFI-SW-C-0948 00 KAIG3-RFI-SW-C-0948-00
KAIG3-RFI-SW-C-0947 00 KAIG3-RFI-SW-C-0947-00
KAIG3-RFI-SW-C-0939 00 KAIG3-RFI-SW-C-0939-00
KAIG3-RFI-ZG-S-5032 00 KAIG3-RFI-ZG-S-5032-00
KAIG3-RFI-WG-C-0955 00 KAIG3-RFI-WG-C-0955-00
KAIG3-RFI-PG-S-5031 00 KAIG3-RFI-PG-S-5031-00
KAIG3-RFI-PG-SU-1789 00 KAIG3-RFI-PG-SU-1789-00
KAIG3-RFI-SW-C-0966 00 KAIG3-RFI-SW-C-0966-00
KAIG3-RFI-SW-C-0965 00 KAIG3-RFI-SW-C-0965-00
KAIG3-RFI-SW-C-0963 00 KAIG3-RFI-SW-C-0963-00
KAIG3-RFI-SW-C-0962 00 KAIG3-RFI-SW-C-0962-00
KAIG3-RFI-SW-C-0961 00 KAIG3-RFI-SW-C-0961-00
KAIG3-RFI-SW-C-0960 00 KAIG3-RFI-SW-C-0960-00
KAIG3-RFI-SW-C-0959 00 KAIG3-RFI-SW-C-0959-00
KAIG3-RFI-SW-C-0958 00 KAIG3-RFI-SW-C-0958-00
KAIG3-RFI-SW-C-0957 00 KAIG3-RFI-SW-C-0957-00
KAIG3-RFI-CO-S-5030 00 KAIG3-RFI-CO-S-5030-00
KAIG3-RFI-CO-S-5029 00 KAIG3-RFI-CO-S-5029-00
KAIG3-RFI-CO-SU-1788 00 KAIG3-RFI-CO-SU-1788-00
KAIG3-RFI-MC-SU-1787 00 KAIG3-RFI-MC-SU-1787-00
KAIG3-RFI-CO-SU-1786 00 KAIG3-RFI-CO-SU-1786-00
KAIG3-RFI-MC-S-5028 00 KAIG3-RFI-MC-S-5028-00
KAIG3-RFI-MC-S-5027 00 KAIG3-RFI-MC-S-5027-00
KAIG3-RFI-MC-S-5026 00 KAIG3-RFI-MC-S-5026-00
KAIG3-RFI-CO-S-5025 00 KAIG3-RFI-CO-S-5025-00
KAIG3-RFI-CO-S-5024 00 KAIG3-RFI-CO-S-5024-00
KAIG3-RFI-CO-S-4434 02 KAIG3-RFI-CO-S-4434-02
KAIG3-RFI-CO-SU-1783 00 KAIG3-RFI-CO-SU-1783-00
KAIG3-RFI-CO-SU-1782 00 KAIG3-RFI-CO-SU-1782-00
KAIG3-RFI-CO-SU-1781 00 KAIG3-RFI-CO-SU-1781-00
KAIG3-RFI-CO-SU-1780 00 KAIG3-RFI-CO-SU-1780-00
KAIG3-RFI-CO-SU-1779 00 KAIG3-RFI-CO-SU-1779-00
KAIG3-RFI-CO-S-5023 00 KAIG3-RFI-CO-S-5023-00
KAIG3-RFI-CO-S-5022 00 KAIG3-RFI-CO-S-5022-00
KAIG3-RFI-CO-S-4928 01 KAIG3-RFI-CO-S-4928-01
KAIG3-RFI-CO-S-4875 01 KAIG3-RFI-CO-S-4875-01
KAIG3-RFI-CO-S-5014 00 KAIG3-RFI-CO-S-5014-00
KAIG3-RFI-CO-S-5013 00 KAIG3-RFI-CO-S-5013-00
KAIG3-RFI-CO-S-5012 00 KAIG3-RFI-CO-S-5012-00
KAIG3-RFI-CO-S-5011 00 KAIG3-RFI-CO-S-5011-00
KAIG3-RFI-CO-S-5010 00 KAIG3-RFI-CO-S-5010-00
KAIG3-RFI-CO-S-5009 00 KAIG3-RFI-CO-S-5009-00
KAIG3-RFI-CO-S-5008 00 KAIG3-RFI-CO-S-5008-00
KAIG3-RFI-CO-S-5007 00 KAIG3-RFI-CO-S-5007-00
KAIG3-RFI-CO-S-5006 00 KAIG3-RFI-CO-S-5006-00
KAIG3-RFI-CO-S-5005 00 KAIG3-RFI-CO-S-5005-00
KAIG3-RFI-AG-S-5020 00 KAIG3-RFI-AG-S-5020-00
KAIG3-RFI-AG-S-5021 00 KAIG3-RFI-AG-S-5021-00
KAIG3-RFI-AG-SU-1785 00 KAIG3-RFI-AG-SU-1785-00
KAIG3-RFI-DG-S-5019 00 KAIG3-RFI-DG-S-5019-00
KAIG3-RFI-DG-SU-1784 00 KAIG3-RFI-DG-SU-1784-00
KAIG3-RFI-DG-C-0956 00 KAIG3-RFI-DG-C-0956-00
KAIG3-RFI-SG-S-5018 00 KAIG3-RFI-SG-S-5018-00
KAIG3-RFI-SG-S-5017 00 KAIG3-RFI-SG-S-5017-00
KAIG3-RFI-SG-S-5016 00 KAIG3-RFI-SG-S-5016-00
KAIG3-RFI-ZG-S-5015 00 KAIG3-RFI-ZG-S-5015-00
KAIG3-RFI-ZG-LC-0257 00 KAIG3-RFI-ZG-LC-0257-00
KAIG3-RFI-CO-S-5004 00 KAIG3-RFI-CO-S-5004-00
KAIG3-RFI-SW-C-0954 00 KAIG3-RFI-SW-C-0954-00
KAIG3-RFI-SW-C-0953 00 KAIG3-RFI-SW-C-0953-00
KAIG3-RFI-SW-C-0952 00 KAIG3-RFI-SW-C-0952-00
KAIG3-RFI-SW-C-0950 00 KAIG3-RFI-SW-C-0950-00
KAIG3-RFI-SW-C-0949 00 KAIG3-RFI-SW-C-0949-00
KAIG3-RFI-SW-C-0946 00 KAIG3-RFI-SW-C-0946-00
KAIG3-RFI-SW-C-0938 00 KAIG3-RFI-SW-C-0938-00
KAIG3-RFI-SW-LS-0541 00 KAIG3-RFI-SW-LS-0541-00
KAIG3-RFI-PA-LS-0505 01 KAIG3-RFI-PA-LS-0505-01
KAIG3-RFI-PG-C-0951 00 KAIG3-RFI-PG-C-0951-00
KAIG3-RFI-CO-SU-1778 00 KAIG3-RFI-CO-SU-1778-00
KAIG3-RFI-CO-S-5003 00 KAIG3-RFI-CO-S-5003-00
KAIG3-RFI-CO-S-5002 00 KAIG3-RFI-CO-S-5002-00
KAIG3-RFI-MB-A-0614 00 KAIG3-RFI-MB-A-0614-00
KAIG3-RFI-CO-S-5001 00 KAIG3-RFI-CO-S-5001-00
KAIG3-RFI-MB-A-0613 00 KAIG3-RFI-MB-A-0613-00
KAIG3-RFI-ZG-SU-1777 00 KAIG3-RFI-ZG-SU-1777-00
KAIG3-RFI-ZG-S-5000 00 KAIG3-RFI-ZG-S-5000-00
KAIG3-RFI-SW-C-0937 00 KAIG3-RFI-SW-C-0937-00
KAIG3-RFI-SW-C-0936 00 KAIG3-RFI-SW-C-0936-00
KAIG3-RFI-SW-C-0935 00 KAIG3-RFI-SW-C-0935-00
KAIG3-RFI-SW-C-0934 00 KAIG3-RFI-SW-C-0934-00
KAIG3-RFI-SW-C-0933 00 KAIG3-RFI-SW-C-0933-00
KAIG3-RFI-SW-C-0932 00 KAIG3-RFI-SW-C-0932-00
KAIG3-RFI-SW-C-0931 00 KAIG3-RFI-SW-C-0931-00
KAIG3-RFI-SW-C-0930 00 KAIG3-RFI-SW-C-0930-00
KAIG3-RFI-SW-LS-0540 00 KAIG3-RFI-SW-LS-0540-00
KAIG3-RFI-CO-SU-1776 00 KAIG3-RFI-CO-SU-1776-00
KAIG3-RFI-CO-SU-1775 00 KAIG3-RFI-CO-SU-1775-00
KAIG3-RFI-CO-S-4999 00 KAIG3-RFI-CO-S-4999-00
KAIG3-RFI-CO-S-4998 00 KAIG3-RFI-CO-S-4998-00
KAIG3-RFI-CO-S-4997 00 KAIG3-RFI-CO-S-4997-00
KAIG3-RFI-MB-C-0759 00 KAIG3-RFI-MB-C-0759-00
KAIG3-RFI-MB-C-0758 00 KAIG3-RFI-MB-C-0758-00
KAIG3-RFI-SW-C-0945 00 KAIG3-RFI-SW-C-0945-00
KAIG3-RFI-SW-C-0944 00 KAIG3-RFI-SW-C-0944-00
KAIG3-RFI-SW-C-0943 00 KAIG3-RFI-SW-C-0943-00
KAIG3-RFI-SW-C-0942 00 KAIG3-RFI-SW-C-0942-00
KAIG3-RFI-SW-C-0941 00 KAIG3-RFI-SW-C-0941-00
KAIG3-RFI-SW-C-0940 00 KAIG3-RFI-SW-C-0940-00
KAIG3-RFI-SW-C-0929 00 KAIG3-RFI-SW-C-0929-00
KAIG3-RFI-SW-C-0928 00 KAIG3-RFI-SW-C-0928-00
KAIG3-RFI-MB-M-0143 03 KAIG3-RFI-MB-M-0143-03
KAIG3-RFI-MB-M-0142 02 KAIG3-RFI-MB-M-0142-02
KAIG3-RFI-CO-SU-1772 00 KAIG3-RFI-CO-SU-1772-00
KAIG3-RFI-CO-S-4941 00 KAIG3-RFI-CO-S-4941-00
KAIG3-RFI-CO-S-4940 00 KAIG3-RFI-CO-S-4940-00
KAIG3-RFI-CO-S-4939 00 KAIG3-RFI-CO-S-4939-00
KAIG3-RFI-CO-S-4594 00 KAIG3-RFI-CO-S-4594-00
KAIG3-RFI-CO-S-4996 00 KAIG3-RFI-CO-S-4996-00
KAIG3-RFI-CO-S-4995 00 KAIG3-RFI-CO-S-4995-00
KAIG3-RFI-CO-S-4994 00 KAIG3-RFI-CO-S-4994-00
KAIG3-RFI-MC-S-4993 00 KAIG3-RFI-MC-S-4993-00
KAIG3-RFI-SW-C-0927 00 KAIG3-RFI-SW-C-0927-00
KAIG3-RFI-SW-C-0926 00 KAIG3-RFI-SW-C-0926-00
KAIG3-RFI-PG-C-0872 01 KAIG3-RFI-PG-C-0872-01
KAIG3-RFI-SG-S-4964 00 KAIG3-RFI-SG-S-4964-00
KAIG3-RFI-SG-S-4961 00 KAIG3-RFI-SG-S-4961-00
KAIG3-RFI-WG-LS-0538 00 KAIG3-RFI-WG-LS-0538-00
KAIG3-RFI-WG-LS-0537 00 KAIG3-RFI-WG-LS-0537-00
KAIG3-RFI-SW-C-0925 00 KAIG3-RFI-SW-C-0925-00
KAIG3-RFI-SW-C-0924 00 KAIG3-RFI-SW-C-0924-00
KAIG3-RFI-SW-C-0923 00 KAIG3-RFI-SW-C-0923-00
KAIG3-RFI-SW-LS-0539 00 KAIG3-RFI-SW-LS-0539-00
KAIG3-RFI-PC-E-0272 00 KAIG3-RFI-PC-E-0272-00
KAIG3-RFI-PC-LC-0256 00 KAIG3-RFI-PC-LC-0256-00
KAIG3-RFI-PC-LC-0255 00 KAIG3-RFI-PC-LC-0255-00
KAIG3-RFI-PC-LC-0254 00 KAIG3-RFI-PC-LC-0254-00
KAIG3-RFI-PC-LC-0253 00 KAIG3-RFI-PC-LC-0253-00
KAIG3-RFI-PC-LC-0252 00 KAIG3-RFI-PC-LC-0252-00
KAIG3-RFI-PC-LC-0251 00 KAIG3-RFI-PC-LC-0251-00
KAIG3-RFI-PC-E-0271 00 KAIG3-RFI-PC-E-0271-00
KAIG3-RFI-PC-E-0270 00 KAIG3-RFI-PC-E-0270-00
KAIG3-RFI-CO-S-4938 00 KAIG3-RFI-CO-S-4938-00
KAIG3-RFI-CO-S-4972 00 KAIG3-RFI-CO-S-4972-00
KAIG3-RFI-CO-S-4973 00 KAIG3-RFI-CO-S-4973-00
KAIG3-RFI-CO-C-0921 00 KAIG3-RFI-CO-C-0921-00
KAIG3-RFI-CO-SU-1773 00 KAIG3-RFI-CO-SU-1773-00
KAIG3-RFI-CO-S-4990 00 KAIG3-RFI-CO-S-4990-00
KAIG3-RFI-CO-S-4989 00 KAIG3-RFI-CO-S-4989-00
KAIG3-RFI-CO-S-4988 00 KAIG3-RFI-CO-S-4988-00
KAIG3-RFI-CO-S-4987 00 KAIG3-RFI-CO-S-4987-00
KAIG3-RFI-CO-S-4986 00 KAIG3-RFI-CO-S-4986-00
KAIG3-RFI-CO-S-4985 00 KAIG3-RFI-CO-S-4985-00
KAIG3-RFI-SW-C-0874 00 KAIG3-RFI-SW-C-0874-00
KAIG3-RFI-SW-LS-0536 00 KAIG3-RFI-SW-LS-0536-00
KAIG3-RFI-SW-LS-0535 00 KAIG3-RFI-SW-LS-0535-00
KAIG3-RFI-CO-S-4984 00 KAIG3-RFI-CO-S-4984-00
KAIG3-RFI-SW-LS-0513 01 KAIG3-RFI-SW-LS-0513-01
KAIG3-RFI-CO-S-4983 00 KAIG3-RFI-CO-S-4983-00
KAIG3-RFI-SW-C-0922 00 KAIG3-RFI-SW-C-0922-00
KAIG3-RFI-CO-S-4982 00 KAIG3-RFI-CO-S-4982-00
KAIG3-RFI-CO-S-4981 00 KAIG3-RFI-CO-S-4981-00
KAIG3-RFI-SW-C-0919 00 KAIG3-RFI-SW-C-0919-00
KAIG3-RFI-SW-C-0918 00 KAIG3-RFI-SW-C-0918-00
KAIG3-RFI-MB-A-0612 00 KAIG3-RFI-MB-A-0612-00
KAIG3-RFI-MB-A-0611 00 KAIG3-RFI-MB-A-0611-00
KAIG3-RFI-MB-A-0610 00 KAIG3-RFI-MB-A-0610-00
KAIG3-RFI-ZG-S-4992 00 KAIG3-RFI-ZG-S-4992-00
KAIG3-RFI-PG-S-4991 00 KAIG3-RFI-PG-S-4991-00
KAIG3-RFI-PG-SU-1774 00 KAIG3-RFI-PG-SU-1774-00
KAIG3-RFI-CO-S-4980 00 KAIG3-RFI-CO-S-4980-00
KAIG3-RFI-CO-S-4979 00 KAIG3-RFI-CO-S-4979-00
KAIG3-RFI-CO-S-4978 00 KAIG3-RFI-CO-S-4978-00
KAIG3-RFI-CO-S-4977 00 KAIG3-RFI-CO-S-4977-00
KAIG3-RFI-PC-LC-0235 01 KAIG3-RFI-PC-LC-0235-01
KAIG3-RFI-PC-LC-0250 00 KAIG3-RFI-PC-LC-0250-00
KAIG3-RFI-PC-LC-0249 00 KAIG3-RFI-PC-LC-0249-00
KAIG3-RFI-PC-LC-0248 00 KAIG3-RFI-PC-LC-0248-00
KAIG3-RFI-CO-C-0916 00 KAIG3-RFI-CO-C-0916-00
KAIG3-RFI-CO-C-0915 00 KAIG3-RFI-CO-C-0915-00
KAIG3-RFI-PC-E-0269 00 KAIG3-RFI-PC-E-0269-00
KAIG3-RFI-CO-SU-1770 00 KAIG3-RFI-CO-SU-1770-00
KAIG3-RFI-CO-SU-1769 00 KAIG3-RFI-CO-SU-1769-00
KAIG3-RFI-ZG-SU-1771 00 KAIG3-RFI-ZG-SU-1771-00
KAIG3-RFI-CO-SU-1768 00 KAIG3-RFI-CO-SU-1768-00
KAIG3-RFI-ZG-C-0920 00 KAIG3-RFI-ZG-C-0920-00
KAIG3-RFI-PG-S-4965 00 KAIG3-RFI-PG-S-4965-00
KAIG3-RFI-PG-SU-1766 00 KAIG3-RFI-PG-SU-1766-00
KAIG3-RFI-CO-SU-1767 00 KAIG3-RFI-CO-SU-1767-00
KAIG3-RFI-SW-C-0917 00 KAIG3-RFI-SW-C-0917-00
KAIG3-RFI-SG-S-4963 00 KAIG3-RFI-SG-S-4963-00
KAIG3-RFI-SW-C-0914 00 KAIG3-RFI-SW-C-0914-00
KAIG3-RFI-CO-S-4975 00 KAIG3-RFI-CO-S-4975-00
KAIG3-RFI-SG-S-4962 00 KAIG3-RFI-SG-S-4962-00
KAIG3-RFI-CO-S-4974 00 KAIG3-RFI-CO-S-4974-00
KAIG3-RFI-PA-C-0734 01 KAIG3-RFI-PA-C-0734-01
KAIG3-RFI-CO-S-4971 00 KAIG3-RFI-CO-S-4971-00
KAIG3-RFI-CO-S-4970 00 KAIG3-RFI-CO-S-4970-00
KAIG3-RFI-CO-S-4969 00 KAIG3-RFI-CO-S-4969-00
KAIG3-RFI-CO-S-4968 00 KAIG3-RFI-CO-S-4968-00
KAIG3-RFI-SG-S-4960 00 KAIG3-RFI-SG-S-4960-00
KAIG3-RFI-CO-S-4967 00 KAIG3-RFI-CO-S-4967-00
KAIG3-RFI-SG-S-4959 00 KAIG3-RFI-SG-S-4959-00
KAIG3-RFI-CO-S-4966 00 KAIG3-RFI-CO-S-4966-00
KAIG3-RFI-CO-SU-1765 00 KAIG3-RFI-CO-SU-1765-00
KAIG3-RFI-CO-SU-1763 00 KAIG3-RFI-CO-SU-1763-00
KAIG3-RFI-CO-SU-1762 00 KAIG3-RFI-CO-SU-1762-00
KAIG3-RFI-CO-SU-1761 00 KAIG3-RFI-CO-SU-1761-00
KAIG3-RFI-CO-SU-1760 00 KAIG3-RFI-CO-SU-1760-00
KAIG3-RFI-CO-SU-1759 00 KAIG3-RFI-CO-SU-1759-00
KAIG3-RFI-CO-S-4958 00 KAIG3-RFI-CO-S-4958-00
KAIG3-RFI-CO-S-4957 00 KAIG3-RFI-CO-S-4957-00
KAIG3-RFI-CO-S-4956 00 KAIG3-RFI-CO-S-4956-00
KAIG3-RFI-CO-S-4955 00 KAIG3-RFI-CO-S-4955-00
KAIG3-RFI-CO-S-4954 00 KAIG3-RFI-CO-S-4954-00
KAIG3-RFI-CO-S-4953 00 KAIG3-RFI-CO-S-4953-00
KAIG3-RFI-CO-S-4952 00 KAIG3-RFI-CO-S-4952-00
KAIG3-RFI-CO-S-4951 00 KAIG3-RFI-CO-S-4951-00
KAIG3-RFI-CO-S-4950 00 KAIG3-RFI-CO-S-4950-00
KAIG3-RFI-CO-S-4949 00 KAIG3-RFI-CO-S-4949-00
KAIG3-RFI-CO-S-4948 00 KAIG3-RFI-CO-S-4948-00
KAIG3-RFI-CO-S-4947 00 KAIG3-RFI-CO-S-4947-00
KAIG3-RFI-SW-C-0913 00 KAIG3-RFI-SW-C-0913-00
KAIG3-RFI-SW-C-0912 00 KAIG3-RFI-SW-C-0912-00
KAIG3-RFI-PA-C-0911 00 KAIG3-RFI-PA-C-0911-00
KAIG3-RFI-PA-C-0910 00 KAIG3-RFI-PA-C-0910-00
KAIG3-RFI-PA-C-0909 00 KAIG3-RFI-PA-C-0909-00
KAIG3-RFI-SW-C-0908 00 KAIG3-RFI-SW-C-0908-00
KAIG3-RFI-PA-C-0907 00 KAIG3-RFI-PA-C-0907-00
KAIG3-RFI-PA-C-0906 00 KAIG3-RFI-PA-C-0906-00
KAIG3-RFI-CO-S-4946 00 KAIG3-RFI-CO-S-4946-00
KAIG3-RFI-CO-S-4945 00 KAIG3-RFI-CO-S-4945-00
KAIG3-RFI-CO-S-4944 00 KAIG3-RFI-CO-S-4944-00
KAIG3-RFI-SW-LS-0534 00 KAIG3-RFI-SW-LS-0534-00
KAIG3-RFI-SW-LS-0533 00 KAIG3-RFI-SW-LS-0533-00
KAIG3-RFI-SW-C-0869 01 KAIG3-RFI-SW-C-0869-01
KAIG3-RFI-SW-C-0868 01 KAIG3-RFI-SW-C-0868-01
KAIG3-RFI-CO-S-4943 00 KAIG3-RFI-CO-S-4943-00
KAIG3-RFI-CO-S-4942 00 KAIG3-RFI-CO-S-4942-00
KAIG3-RFI-SW-C-0903 00 KAIG3-RFI-SW-C-0903-00
KAIG3-RFI-SW-C-0904 00 KAIG3-RFI-SW-C-0904-00
KAIG3-RFI-SW-C-0902-00 00 KAIG3-RFI-SW-C-0902-00-00
KAIG3-RFI-SW-C-0901 00 KAIG3-RFI-SW-C-0901-00
KAIG3-RFI-PC-LC-0247 00 KAIG3-RFI-PC-LC-0247-00
KAIG3-RFI-PC-LC-0246 00 KAIG3-RFI-PC-LC-0246-00
KAIG3-RFI-PC-E-0268 00 KAIG3-RFI-PC-E-0268-00
KAIG3-RFI-PG-S-4911 00 KAIG3-RFI-PG-S-4911-00
KAIG3-RFI-ZG-S-4910 00 KAIG3-RFI-ZG-S-4910-00
KAIG3-RFI-CO-SU-1758 00 KAIG3-RFI-CO-SU-1758-00
KAIG3-RFI-CO-S-4937 00 KAIG3-RFI-CO-S-4937-00
KAIG3-RFI-CO-S-4936 00 KAIG3-RFI-CO-S-4936-00
KAIG3-RFI-CO-S-4935 00 KAIG3-RFI-CO-S-4935-00
KAIG3-RFI-CO-S-4934 00 KAIG3-RFI-CO-S-4934-00
KAIG3-RFI-MC-S-4931 00 KAIG3-RFI-MC-S-4931-00
KAIG3-RFI-CO-S-4933 00 KAIG3-RFI-CO-S-4933-00
KAIG3-RFI-CO-S-4932 00 KAIG3-RFI-CO-S-4932-00
KAIG3-RFI-CO-S-4926 00 KAIG3-RFI-CO-S-4926-00
KAIG3-RFI-CO-S-4925 00 KAIG3-RFI-CO-S-4925-00
KAIG3-RFI-MB-A-0609 00 KAIG3-RFI-MB-A-0609-00
KAIG3-RFI-SW-C-0900 00 KAIG3-RFI-SW-C-0900-00
KAIG3-RFI-SW-C-0899 00 KAIG3-RFI-SW-C-0899-00
KAIG3-RFI-SW-C-0898 00 KAIG3-RFI-SW-C-0898-00
KAIG3-RFI-CO-LC-0206 00 KAIG3-RFI-CO-LC-0206-00
KAIG3-RFI-CO-LC-0205 00 KAIG3-RFI-CO-LC-0205-00
KAIG3-RFI-CO-LC-0204 00 KAIG3-RFI-CO-LC-0204-00
KAIG3-RFI-CO-LC-0203 01 KAIG3-RFI-CO-LC-0203-01
KAIG3-RFI-CO-LC-0202 01 KAIG3-RFI-CO-LC-0202-01
KAIG3-RFI-CO-LC-0201 01 KAIG3-RFI-CO-LC-0201-01
KAIG3-RFI-SW-C-0845 00 KAIG3-RFI-SW-C-0845-00
KAIG3-RFI-CO-SU-1757 00 KAIG3-RFI-CO-SU-1757-00
KAIG3-RFI-CO-SU-1756 00 KAIG3-RFI-CO-SU-1756-00
KAIG3-RFI-CO-SU-1755 00 KAIG3-RFI-CO-SU-1755-00
KAIG3-RFI-CO-SU-1717 01 KAIG3-RFI-CO-SU-1717-01
KAIG3-RFI-CO-SU-1754 00 KAIG3-RFI-CO-SU-1754-00
KAIG3-RFI-CO-SU-1753 00 KAIG3-RFI-CO-SU-1753-00
KAIG3-RFI-CO-S-4930 00 KAIG3-RFI-CO-S-4930-00
KAIG3-RFI-CO-S-4929 00 KAIG3-RFI-CO-S-4929-00
KAIG3-RFI-CO-S-4928 00 KAIG3-RFI-CO-S-4928-00
KAIG3-RFI-SW-C-0897 00 KAIG3-RFI-SW-C-0897-00
KAIG3-RFI-PA-C-0895 00 KAIG3-RFI-PA-C-0895-00
KAIG3-RFI-PA-C-0894 00 KAIG3-RFI-PA-C-0894-00
KAIG3-RFI-PA-C-0893 00 KAIG3-RFI-PA-C-0893-00
KAIG3-RFI-SW-C-0892 00 KAIG3-RFI-SW-C-0892-00
KAIG3-RFI-SW-C-0891 00 KAIG3-RFI-SW-C-0891-00
KAIG3-RFI-SW-LS-0532 00 KAIG3-RFI-SW-LS-0532-00
KAIG3-RFI-SW-LS-0516 02 KAIG3-RFI-SW-LS-0516-02
KAIG3-RFI-PA-C-0722 01 KAIG3-RFI-PA-C-0722-01
KAIG3-RFI-CO-S-4927 00 KAIG3-RFI-CO-S-4927-00
KAIG3-RFI-CO-S-4924 00 KAIG3-RFI-CO-S-4924-00
KAIG3-RFI-CO-S-4923 00 KAIG3-RFI-CO-S-4923-00
KAIG3-RFI-CO-LC-0189 02 KAIG3-RFI-CO-LC-0189-02
KAIG3-RFI-CO-S-4922 00 KAIG3-RFI-CO-S-4922-00
KAIG3-RFI-CO-S-4921 00 KAIG3-RFI-CO-S-4921-00
KAIG3-RFI-CO-LC-0188 01 KAIG3-RFI-CO-LC-0188-01
KAIG3-RFI-CO-S-4920 00 KAIG3-RFI-CO-S-4920-00
KAIG3-RFI-CO-S-4919 00 KAIG3-RFI-CO-S-4919-00
KAIG3-RFI-CO-S-4918 00 KAIG3-RFI-CO-S-4918-00
KAIG3-RFI-CO-S-4917 00 KAIG3-RFI-CO-S-4917-00
KAIG3-RFI-CO-S-4916 00 KAIG3-RFI-CO-S-4916-00
KAIG3-RFI-ZG-C-0896 00 KAIG3-RFI-ZG-C-0896-00
KAIG3-RFI-CO-LC-0187-00 01 KAIG3-RFI-CO-LC-0187-00-01
KAIG3-RFI-SW-LS-0516 01 KAIG3-RFI-SW-LS-0516-01
KAIG3-RFI-SW-C-0890 00 KAIG3-RFI-SW-C-0890-00
KAIG3-RFI-SW-C-0889 00 KAIG3-RFI-SW-C-0889-00
KAIG3-RFI-SG-LS-0531 00 KAIG3-RFI-SG-LS-0531-00
KAIG3-RFI-MB-A-0608 00 KAIG3-RFI-MB-A-0608-00
KAIG3-RFI-MB-A-0607 00 KAIG3-RFI-MB-A-0607-00
KAIG3-RFI-PG-S-4909 00 KAIG3-RFI-PG-S-4909-00
KAIG3-RFI-PG-S-4895 00 KAIG3-RFI-PG-S-4895-00
KAIG3-RFI-PG-S-4894 00 KAIG3-RFI-PG-S-4894-00
KAIG3-RFI-CO-SU-1752 00 KAIG3-RFI-CO-SU-1752-00
KAIG3-RFI-MC-S-4915 00 KAIG3-RFI-MC-S-4915-00
KAIG3-RFI-CO-S-4914 00 KAIG3-RFI-CO-S-4914-00
KAIG3-RFI-CO-S-4913 00 KAIG3-RFI-CO-S-4913-00
KAIG3-RFI-CO-S-4912 00 KAIG3-RFI-CO-S-4912-00
KAIG3-RFI-WG-C-0884 00 KAIG3-RFI-WG-C-0884-00
KAIG3-RFI-SG-S-4908 00 KAIG3-RFI-SG-S-4908-00
KAIG3-RFI-WG-LS-0528 00 KAIG3-RFI-WG-LS-0528-00
KAIG3-RFI-WG-LS-0527 00 KAIG3-RFI-WG-LS-0527-00
KAIG3-RFI-WG-LS-0526 00 KAIG3-RFI-WG-LS-0526-00
KAIG3-RFI-MB-S-4893 00 KAIG3-RFI-MB-S-4893-00
KAIG3-RFI-MB-S-4892 00 KAIG3-RFI-MB-S-4892-00
KAIG3-RFI-SW-LS-0530 00 KAIG3-RFI-SW-LS-0530-00
KAIG3-RFI-SW-LS-0529 00 KAIG3-RFI-SW-LS-0529-00
KAIG3-RFI-SW-C-0883 00 KAIG3-RFI-SW-C-0883-00
KAIG3-RFI-SW-C-0882 00 KAIG3-RFI-SW-C-0882-00
KAIG3-RFI-SW-C-0881 00 KAIG3-RFI-SW-C-0881-00
KAIG3-RFI-PA-C-0880 00 KAIG3-RFI-PA-C-0880-00
KAIG3-RFI-PA-C-0879 00 KAIG3-RFI-PA-C-0879-00
KAIG3-RFI-PA-C-0878 00 KAIG3-RFI-PA-C-0878-00
KAIG3-RFI-SW-C-0877 00 KAIG3-RFI-SW-C-0877-00
KAIG3-RFI-SW-C-0876 00 KAIG3-RFI-SW-C-0876-00
KAIG3-RFI-MB-A-0606 00 KAIG3-RFI-MB-A-0606-00
KAIG3-RFI-SW-C-0875 00 KAIG3-RFI-SW-C-0875-00
KAIG3-RFI-SW-C-0844 01 KAIG3-RFI-SW-C-0844-01
KAIG3-RFI-PA-C-0831 01 KAIG3-RFI-PA-C-0831-01
KAIG3-RFI-MB-A-0605 00 KAIG3-RFI-MB-A-0605-00
KAIG3-RFI-PG-S-4891 00 KAIG3-RFI-PG-S-4891-00
KAIG3-RFI-PG-SU-1748 00 KAIG3-RFI-PG-SU-1748-00
KAIG3-RFI-PG-SU-1747 00 KAIG3-RFI-PG-SU-1747-00
KAIG3-RFI-SG-SU-1746 00 KAIG3-RFI-SG-SU-1746-00
KAIG3-RFI-SG-S-4890 00 KAIG3-RFI-SG-S-4890-00
KAIG3-RFI-MC-SU-1751 00 KAIG3-RFI-MC-SU-1751-00
KAIG3-RFI-CO-SU-1750 00 KAIG3-RFI-CO-SU-1750-00
KAIG3-RFI-CO-SU-1749 00 KAIG3-RFI-CO-SU-1749-00
KAIG3-RFI-MC-S-4906 00 KAIG3-RFI-MC-S-4906-00
KAIG3-RFI-MC-S-4905 00 KAIG3-RFI-MC-S-4905-00
KAIG3-RFI-MC-S-4904 00 KAIG3-RFI-MC-S-4904-00
KAIG3-RFI-CO-S-4907 00 KAIG3-RFI-CO-S-4907-00
KAIG3-RFI-CO-S-4903 00 KAIG3-RFI-CO-S-4903-00
KAIG3-RFI-CO-S-4902 00 KAIG3-RFI-CO-S-4902-00
KAIG3-RFI-CO-S-4901 00 KAIG3-RFI-CO-S-4901-00
KAIG3-RFI-CO-S-4900 00 KAIG3-RFI-CO-S-4900-00
KAIG3-RFI-CO-S-4899 00 KAIG3-RFI-CO-S-4899-00
KAIG3-RFI-CO-S-4898 00 KAIG3-RFI-CO-S-4898-00
KAIG3-RFI-CO-S-4897 00 KAIG3-RFI-CO-S-4897-00
KAIG3-RFI-CO-S-4896 00 KAIG3-RFI-CO-S-4896-00
KAIG3-RFI-SW-C-0888 00 KAIG3-RFI-SW-C-0888-00
KAIG3-RFI-SW-C-0887 00 KAIG3-RFI-SW-C-0887-00
KAIG3-RFI-SW-C-0886 00 KAIG3-RFI-SW-C-0886-00
KAIG3-RFI-SW-C-0885 00 KAIG3-RFI-SW-C-0885-00
KAIG3-RFI-SG-S-4889 00 KAIG3-RFI-SG-S-4889-00
KAIG3-RFI-SG-S-4888 00 KAIG3-RFI-SG-S-4888-00
KAIG3-RFI-MB-S-4887 00 KAIG3-RFI-MB-S-4887-00
KAIG3-RFI-MB-S-4886 00 KAIG3-RFI-MB-S-4886-00
KAIG3-RFI-ZG-S-4885 00 KAIG3-RFI-ZG-S-4885-00
KAIG3-RFI-PG-S-4876 00 KAIG3-RFI-PG-S-4876-00
KAIG3-RFI-MB-A-0604 00 KAIG3-RFI-MB-A-0604-00
KAIG3-RFI-MB-A-0603 00 KAIG3-RFI-MB-A-0603-00
KAIG3-RFI-MB-A-0602 00 KAIG3-RFI-MB-A-0602-00
KAIG3-RFI-PG-C-0872 00 KAIG3-RFI-PG-C-0872-00
KAIG3-RFI-CO-S-4883 00 KAIG3-RFI-CO-S-4883-00
KAIG3-RFI-CO-S-4882 00 KAIG3-RFI-CO-S-4882-00
KAIG3-RFI-CO-S-4881 00 KAIG3-RFI-CO-S-4881-00
KAIG3-RFI-CO-S-4871 00 KAIG3-RFI-CO-S-4871-00
KAIG3-RFI-CO-S-4872 00 KAIG3-RFI-CO-S-4872-00
KAIG3-RFI-CO-S-4880 00 KAIG3-RFI-CO-S-4880-00
KAIG3-RFI-CO-S-4879 00 KAIG3-RFI-CO-S-4879-00
KAIG3-RFI-CO-S-4884 00 KAIG3-RFI-CO-S-4884-00
KAIG3-RFI-CO-S-4878 00 KAIG3-RFI-CO-S-4878-00
KAIG3-RFI-CO-S-4877 00 KAIG3-RFI-CO-S-4877-00
KAIG3-RFI-CO-SS-0002 00 KAIG3-RFI-CO-SS-0002-00
KAIG3-RFI-CO-SU-1745 00 KAIG3-RFI-CO-SU-1745-00
KAIG3-RFI-PG-E-0267 00 KAIG3-RFI-PG-E-0267-00
KAIG3-RFI-PG-E-0266 00 KAIG3-RFI-PG-E-0266-00
KAIG3-RFI-PG-LC-0245 00 KAIG3-RFI-PG-LC-0245-00
KAIG3-RFI-PG-LC-0244 00 KAIG3-RFI-PG-LC-0244-00
KAIG3-RFI-PG-LC-0243 00 KAIG3-RFI-PG-LC-0243-00
KAIG3-RFI-PG-LC-0242 00 KAIG3-RFI-PG-LC-0242-00
KAIG3-RFI-SW-C-0871 00 KAIG3-RFI-SW-C-0871-00
KAIG3-RFI-SW-C-0870 00 KAIG3-RFI-SW-C-0870-00
KAIG3-RFI-PC-LC-0241 00 KAIG3-RFI-PC-LC-0241-00
KAIG3-RFI-PC-LC-0240 00 KAIG3-RFI-PC-LC-0240-00
KAIG3-RFI-CO-S-4875 00 KAIG3-RFI-CO-S-4875-00
KAIG3-RFI-CO-S-4873 00 KAIG3-RFI-CO-S-4873-00
KAIG3-RFI-CO-S-4870 00 KAIG3-RFI-CO-S-4870-00
KAIG3-RFI-CO-S-4869 00 KAIG3-RFI-CO-S-4869-00
KAIG3-RFI-CO-S-4868 00 KAIG3-RFI-CO-S-4868-00
KAIG3-RFI-CO-S-4867 00 KAIG3-RFI-CO-S-4867-00
KAIG3-RFI-CO-S-4866 00 KAIG3-RFI-CO-S-4866-00
KAIG3-RFI-CO-S-4865 00 KAIG3-RFI-CO-S-4865-00
KAIG3-RFI-CO-S-4864 00 KAIG3-RFI-CO-S-4864-00
KAIG3-RFI-CO-S-4863 00 KAIG3-RFI-CO-S-4863-00
KAIG3-RFI-CO-S-4862 00 KAIG3-RFI-CO-S-4862-00
KAIG3-RFI-CO-S-4861 00 KAIG3-RFI-CO-S-4861-00
KAIG3-RFI-CO-S-4860 00 KAIG3-RFI-CO-S-4860-00
KAIG3-RFI-CO-C-0864 00 KAIG3-RFI-CO-C-0864-00
KAIG3-RFI-CO-SU-1743 00 KAIG3-RFI-CO-SU-1743-00
KAIG3-RFI-CO-SU-1742 00 KAIG3-RFI-CO-SU-1742-00
KAIG3-RFI-CO-SU-1741 00 KAIG3-RFI-CO-SU-1741-00
KAIG3-RFI-CO-SU-1740 00 KAIG3-RFI-CO-SU-1740-00
KAIG3-RFI-CO-SU-1737 01 KAIG3-RFI-CO-SU-1737-01
KAIG3-RFI-SW-C-0593 01 KAIG3-RFI-SW-C-0593-01
KAIG3-RFI-CO-SU-1733 01 KAIG3-RFI-CO-SU-1733-01
KAIG3-RFI-SW-C-0869 00 KAIG3-RFI-SW-C-0869-00
KAIG3-RFI-SW-C-0868 00 KAIG3-RFI-SW-C-0868-00
KAIG3-RFI-PA-C-0867 00 KAIG3-RFI-PA-C-0867-00
KAIG3-RFI-PA-C-0866 00 KAIG3-RFI-PA-C-0866-00
KAIG3-RFI-PA-C-0865 00 KAIG3-RFI-PA-C-0865-00
KAIG3-RFI-SW-LS-0525 00 KAIG3-RFI-SW-LS-0525-00
KAIG3-RFI-SW-LS-0524 00 KAIG3-RFI-SW-LS-0524-00
KAIG3-RFI-SW-LS-0522 01 KAIG3-RFI-SW-LS-0522-01
KAIG3-RFI-SW-C-0863 00 KAIG3-RFI-SW-C-0863-00
KAIG3-RFI-SW-C-0862 00 KAIG3-RFI-SW-C-0862-00
KAIG3-RFI-SW-C-0861 00 KAIG3-RFI-SW-C-0861-00
KAIG3-RFI-SW-C-0860 00 KAIG3-RFI-SW-C-0860-00
KAIG3-RFI-SW-C-0859 00 KAIG3-RFI-SW-C-0859-00
KAIG3-RFI-SW-C-0828 01 KAIG3-RFI-SW-C-0828-01
KAIG3-RFI-SW-C-0827 01 KAIG3-RFI-SW-C-0827-01
KAIG3-RFI-AG-S-4874 00 KAIG3-RFI-AG-S-4874-00
KAIG3-RFI-PG-SU-1744 00 KAIG3-RFI-PG-SU-1744-00
KAIG3-RFI-CO-S-4853 00 KAIG3-RFI-CO-S-4853-00
KAIG3-RFI-SW-C-0858 00 KAIG3-RFI-SW-C-0858-00
KAIG3-RFI-PA-C-0856 00 KAIG3-RFI-PA-C-0856-00
KAIG3-RFI-PA-C-0855 00 KAIG3-RFI-PA-C-0855-00
KAIG3-RFI-PA-C-0854 00 KAIG3-RFI-PA-C-0854-00
KAIG3-RFI-PA-C-0853 00 KAIG3-RFI-PA-C-0853-00
KAIG3-RFI-PA-C-0852 00 KAIG3-RFI-PA-C-0852-00
KAIG3-RFI-SW-LS-0523 00 KAIG3-RFI-SW-LS-0523-00
KAIG3-RFI-CO-S-4859 00 KAIG3-RFI-CO-S-4859-00
KAIG3-RFI-CO-S-4858 00 KAIG3-RFI-CO-S-4858-00
KAIG3-RFI-CO-S-4857 00 KAIG3-RFI-CO-S-4857-00
KAIG3-RFI-MC-S-4856 00 KAIG3-RFI-MC-S-4856-00
KAIG3-RFI-CO-S-4855 00 KAIG3-RFI-CO-S-4855-00
KAIG3-RFI-CO-S-4854 00 KAIG3-RFI-CO-S-4854-00
KAIG3-RFI-MB-A-0601 00 KAIG3-RFI-MB-A-0601-00
KAIG3-RFI-MB-A-0600 00 KAIG3-RFI-MB-A-0600-00
KAIG3-RFI-MB-A-0599 00 KAIG3-RFI-MB-A-0599-00
KAIG3-RFI-PG-S-4853 00 KAIG3-RFI-PG-S-4853-00
KAIG3-RFI-CO-SU-1739 00 KAIG3-RFI-CO-SU-1739-00
KAIG3-RFI-CO-C-0857 00 KAIG3-RFI-CO-C-0857-00
KAIG3-RFI-PG-S-4823 00 KAIG3-RFI-PG-S-4823-00
KAIG3-RFI-CO-SU-1738 00 KAIG3-RFI-CO-SU-1738-00
KAIG3-RFI-CO-S-4852 00 KAIG3-RFI-CO-S-4852-00
KAIG3-RFI-CO-S-4851 00 KAIG3-RFI-CO-S-4851-00
KAIG3-RFI-CO-S-4850 00 KAIG3-RFI-CO-S-4850-00
KAIG3-RFI-CO-S-4849 00 KAIG3-RFI-CO-S-4849-00
KAIG3-RFI-CO-S-4848 00 KAIG3-RFI-CO-S-4848-00
KAIG3-RFI-CO-S-4847 00 KAIG3-RFI-CO-S-4847-00
KAIG3-RFI-CO-S-4846 00 KAIG3-RFI-CO-S-4846-00
KAIG3-RFI-CO-S-4845 00 KAIG3-RFI-CO-S-4845-00
KAIG3-RFI-SW-C-0851 00 KAIG3-RFI-SW-C-0851-00
KAIG3-RFI-SW-C-0850 00 KAIG3-RFI-SW-C-0850-00
KAIG3-RFI-SW-C-0849 00 KAIG3-RFI-SW-C-0849-00
KAIG3-RFI-SW-C-0848 00 KAIG3-RFI-SW-C-0848-00
KAIG3-RFI-SW-C-0847 00 KAIG3-RFI-SW-C-0847-00
KAIG3-RFI-SW-C-0846 00 KAIG3-RFI-SW-C-0846-00
KAIG3-RFI-SW-C-0844 00 KAIG3-RFI-SW-C-0844-00
KAIG3-RFI-MB-M-0149 00 KAIG3-RFI-MB-M-0149-00
KAIG3-RFI-PA-C-0843 00 KAIG3-RFI-PA-C-0843-00
KAIG3-RFI-PA-C-0842 00 KAIG3-RFI-PA-C-0842-00
KAIG3-RFI-SW-C-0841 00 KAIG3-RFI-SW-C-0841-00
KAIG3-RFI-SW-C-0840 00 KAIG3-RFI-SW-C-0840-00
KAIG3-RFI-PA-C-0804 01 KAIG3-RFI-PA-C-0804-01
KAIG3-RFI-PA-C-0803 01 KAIG3-RFI-PA-C-0803-01
KAIG3-RFI-PA-C-0774 01 KAIG3-RFI-PA-C-0774-01
KAIG3-RFI-PG-E-0265 00 KAIG3-RFI-PG-E-0265-00
KAIG3-RFI-CO-S-4844 00 KAIG3-RFI-CO-S-4844-00
KAIG3-RFI-CO-SU-1737 00 KAIG3-RFI-CO-SU-1737-00
KAIG3-RFI-CO-SU-1723 00 KAIG3-RFI-CO-SU-1723-00
KAIG3-RFI-CO-S-4843 00 KAIG3-RFI-CO-S-4843-00
KAIG3-RFI-CO-S-4301 02 KAIG3-RFI-CO-S-4301-02
KAIG3-RFI-CO-S-4809 01 KAIG3-RFI-CO-S-4809-01
KAIG3-RFI-CO-S-4839 00 KAIG3-RFI-CO-S-4839-00
KAIG3-RFI-CO-S-4838 00 KAIG3-RFI-CO-S-4838-00
KAIG3-RFI-CO-S-4837 00 KAIG3-RFI-CO-S-4837-00
KAIG3-RFI-CO-S-4836 00 KAIG3-RFI-CO-S-4836-00
KAIG3-RFI-CO-S-4835 00 KAIG3-RFI-CO-S-4835-00
KAIG3-RFI-SW-LS-0522 00 KAIG3-RFI-SW-LS-0522-00
KAIG3-RFI-SW-LS-0521 00 KAIG3-RFI-SW-LS-0521-00
KAIG3-RFI-SW-LS-0515 01 KAIG3-RFI-SW-LS-0515-01
KAIG3-RFI-SW-LS-0514 01 KAIG3-RFI-SW-LS-0514-01
KAIG3-RFI-SW-LS-0510 02 KAIG3-RFI-SW-LS-0510-02
KAIG3-RFI-AG-S-4842 00 KAIG3-RFI-AG-S-4842-00
KAIG3-RFI-ZG-SU-1736 00 KAIG3-RFI-ZG-SU-1736-00
KAIG3-RFI-ZG-C-0839 00 KAIG3-RFI-ZG-C-0839-00
KAIG3-RFI-SG-S-4841 00 KAIG3-RFI-SG-S-4841-00
KAIG3-RFI-SG-S-4840 00 KAIG3-RFI-SG-S-4840-00
KAIG3-RFI-WG-LS-0520 00 KAIG3-RFI-WG-LS-0520-00
KAIG3-RFI-WG-LS-0499 01 KAIG3-RFI-WG-LS-0499-01
KAIG3-RFI-WG-LS-0498 01 KAIG3-RFI-WG-LS-0498-01
KAIG3-RFI-PG-E-0264 00 KAIG3-RFI-PG-E-0264-00
KAIG3-RFI-PG-LC-0239 00 KAIG3-RFI-PG-LC-0239-00
KAIG3-RFI-PG-LC-0238 00 KAIG3-RFI-PG-LC-0238-00
KAIG3-RFI-PG-LC-0237 00 KAIG3-RFI-PG-LC-0237-00
KAIG3-RFI-PG-LC-0236 00 KAIG3-RFI-PG-LC-0236-00
KAIG3-RFI-PA-C-0831 00 KAIG3-RFI-PA-C-0831-00
KAIG3-RFI-SW-C-0829 00 KAIG3-RFI-SW-C-0829-00
KAIG3-RFI-SW-C-0828 00 KAIG3-RFI-SW-C-0828-00
KAIG3-RFI-SW-C-0827 00 KAIG3-RFI-SW-C-0827-00
KAIG3-RFI-PA-C-0826 00 KAIG3-RFI-PA-C-0826-00
KAIG3-RFI-PA-C-0825 00 KAIG3-RFI-PA-C-0825-00
KAIG3-RFI-SW-LS-0519 00 KAIG3-RFI-SW-LS-0519-00
KAIG3-RFI-CO-S-4834 00 KAIG3-RFI-CO-S-4834-00
KAIG3-RFI-CO-S-4833 00 KAIG3-RFI-CO-S-4833-00
KAIG3-RFI-CO-S-4832 00 KAIG3-RFI-CO-S-4832-00
KAIG3-RFI-CO-S-4831 00 KAIG3-RFI-CO-S-4831-00
KAIG3-RFI-CO-S-4828 00 KAIG3-RFI-CO-S-4828-00
KAIG3-RFI-CO-S-4827 00 KAIG3-RFI-CO-S-4827-00
KAIG3-RFI-CO-SU-1735 00 KAIG3-RFI-CO-SU-1735-00
KAIG3-RFI-MB-A-0598 00 KAIG3-RFI-MB-A-0598-00
KAIG3-RFI-MB-A-0597 00 KAIG3-RFI-MB-A-0597-00
KAIG3-RFI-SW-C-0838 00 KAIG3-RFI-SW-C-0838-00
KAIG3-RFI-SW-C-0837 00 KAIG3-RFI-SW-C-0837-00
KAIG3-RFI-SW-C-0836 00 KAIG3-RFI-SW-C-0836-00
KAIG3-RFI-SW-C-0835 00 KAIG3-RFI-SW-C-0835-00
KAIG3-RFI-SW-C-0834 00 KAIG3-RFI-SW-C-0834-00
KAIG3-RFI-SW-C-0833 00 KAIG3-RFI-SW-C-0833-00
KAIG3-RFI-SW-C-0832 00 KAIG3-RFI-SW-C-0832-00
KAIG3-RFI-SW-C-0824 00 KAIG3-RFI-SW-C-0824-00
KAIG3-RFI-SW-C-0823 00 KAIG3-RFI-SW-C-0823-00
KAIG3-RFI-SW-C-0822 00 KAIG3-RFI-SW-C-0822-00
KAIG3-RFI-SW-C-0821 00 KAIG3-RFI-SW-C-0821-00
KAIG3-RFI-FC-P-0150 00 KAIG3-RFI-FC-P-0150-00
KAIG3-RFI-SG-S-4826 00 KAIG3-RFI-SG-S-4826-00
KAIG3-RFI-CO-SU-1734 00 KAIG3-RFI-CO-SU-1734-00
KAIG3-RFI-CO-S-4830 00 KAIG3-RFI-CO-S-4830-00
KAIG3-RFI-CO-S-4829 00 KAIG3-RFI-CO-S-4829-00
KAIG3-RFI-CO-SU-1733 00 KAIG3-RFI-CO-SU-1733-00
KAIG3-RFI-CO-S-4825 00 KAIG3-RFI-CO-S-4825-00
KAIG3-RFI-CO-S-4824 00 KAIG3-RFI-CO-S-4824-00
KAIG3-RFI-CO-S-4822 00 KAIG3-RFI-CO-S-4822-00
KAIG3-RFI-WG-LS-0518 00 KAIG3-RFI-WG-LS-0518-00
KAIG3-RFI-WG-LS-0517 00 KAIG3-RFI-WG-LS-0517-00
KAIG3-RFI-PG-SU-1732 00 KAIG3-RFI-PG-SU-1732-00
KAIG3-RFI-SW-LS-0516 00 KAIG3-RFI-SW-LS-0516-00
KAIG3-RFI-SW-LS-0510 01 KAIG3-RFI-SW-LS-0510-01
KAIG3-RFI-SW-C-0820 00 KAIG3-RFI-SW-C-0820-00
KAIG3-RFI-SW-C-0819 00 KAIG3-RFI-SW-C-0819-00
KAIG3-RFI-SW-C-0818 00 KAIG3-RFI-SW-C-0818-00
KAIG3-RFI-CO-SU-1731 00 KAIG3-RFI-CO-SU-1731-00
KAIG3-RFI-CO-SU-1730 00 KAIG3-RFI-CO-SU-1730-00
KAIG3-RFI-CO-SU-1729 00 KAIG3-RFI-CO-SU-1729-00
KAIG3-RFI-CO-S-4821 00 KAIG3-RFI-CO-S-4821-00
KAIG3-RFI-CO-S-4820 00 KAIG3-RFI-CO-S-4820-00
KAIG3-RFI-CO-S-4819 00 KAIG3-RFI-CO-S-4819-00
KAIG3-RFI-CO-S-4818 00 KAIG3-RFI-CO-S-4818-00
KAIG3-RFI-CO-S-4817 00 KAIG3-RFI-CO-S-4817-00
KAIG3-RFI-CO-S-4816 00 KAIG3-RFI-CO-S-4816-00
KAIG3-RFI-CO-S-4815 00 KAIG3-RFI-CO-S-4815-00
KAIG3-RFI-SW-LS-0515 00 KAIG3-RFI-SW-LS-0515-00
KAIG3-RFI-SW-LS-0514 00 KAIG3-RFI-SW-LS-0514-00
KAIG3-RFI-SW-LS-0513 00 KAIG3-RFI-SW-LS-0513-00
KAIG3-RFI-SW-C-0817 00 KAIG3-RFI-SW-C-0817-00
KAIG3-RFI-SW-C-0816 00 KAIG3-RFI-SW-C-0816-00
KAIG3-RFI-SW-C-0815 00 KAIG3-RFI-SW-C-0815-00
KAIG3-RFI-SW-C-0814 00 KAIG3-RFI-SW-C-0814-00
KAIG3-RFI-SW-C-0811 00 KAIG3-RFI-SW-C-0811-00
KAIG3-RFI-SW-C-0809 00 KAIG3-RFI-SW-C-0809-00
KAIG3-RFI-SW-C-0808 00 KAIG3-RFI-SW-C-0808-00
KAIG3-RFI-SW-C-0807 00 KAIG3-RFI-SW-C-0807-00
KAIG3-RFI-PC-LC-0235 00 KAIG3-RFI-PC-LC-0235-00
KAIG3-RFI-WG-LS-0512 00 KAIG3-RFI-WG-LS-0512-00
KAIG3-RFI-WG-LS-0511 00 KAIG3-RFI-WG-LS-0511-00
KAIG3-RFI-SG-A-0596 00 KAIG3-RFI-SG-A-0596-00
KAIG3-RFI-WG-S-4626 01 KAIG3-RFI-WG-S-4626-01
KAIG3-RFI-WG-S-4625 01 KAIG3-RFI-WG-S-4625-01
KAIG3-RFI-PG-S-4814 00 KAIG3-RFI-PG-S-4814-00
KAIG3-RFI-MB-A-0595 00 KAIG3-RFI-MB-A-0595-00
KAIG3-RFI-PC-LC-0234 00 KAIG3-RFI-PC-LC-0234-00
KAIG3-RFI-PC-E-0263 00 KAIG3-RFI-PC-E-0263-00
KAIG3-RFI-PC-LC-0232 00 KAIG3-RFI-PC-LC-0232-00
KAIG3-RFI-PC-E-0262 00 KAIG3-RFI-PC-E-0262-00
KAIG3-RFI-CO-C-0812 00 KAIG3-RFI-CO-C-0812-00
KAIG3-RFI-CO-SU-1728 00 KAIG3-RFI-CO-SU-1728-00
KAIG3-RFI-CO-SU-1727 00 KAIG3-RFI-CO-SU-1727-00
KAIG3-RFI-CO-SU-1726 00 KAIG3-RFI-CO-SU-1726-00
KAIG3-RFI-MC-SU-1725 00 KAIG3-RFI-MC-SU-1725-00
KAIG3-RFI-CO-SU-1724 00 KAIG3-RFI-CO-SU-1724-00
KAIG3-RFI-CO-S-4809 00 KAIG3-RFI-CO-S-4809-00
KAIG3-RFI-CO-S-4808 00 KAIG3-RFI-CO-S-4808-00
KAIG3-RFI-CO-S-4807 00 KAIG3-RFI-CO-S-4807-00
KAIG3-RFI-CO-S-4806 00 KAIG3-RFI-CO-S-4806-00
KAIG3-RFI-CO-S-4805 00 KAIG3-RFI-CO-S-4805-00
KAIG3-RFI-CO-S-4804 00 KAIG3-RFI-CO-S-4804-00
KAIG3-RFI-CO-S-4803 00 KAIG3-RFI-CO-S-4803-00
KAIG3-RFI-MC-S-4802 00 KAIG3-RFI-MC-S-4802-00
KAIG3-RFI-MC-S-4801 00 KAIG3-RFI-MC-S-4801-00
KAIG3-RFI-MC-S-4800 00 KAIG3-RFI-MC-S-4800-00
KAIG3-RFI-CO-S-4799 00 KAIG3-RFI-CO-S-4799-00
KAIG3-RFI-CO-S-4798 00 KAIG3-RFI-CO-S-4798-00
KAIG3-RFI-CO-S-4797 00 KAIG3-RFI-CO-S-4797-00
KAIG3-RFI-CO-S-4796 00 KAIG3-RFI-CO-S-4796-00
KAIG3-RFI-CO-S-4795 00 KAIG3-RFI-CO-S-4795-00
KAIG3-RFI-MB-LC-0233 00 KAIG3-RFI-MB-LC-0233-00
KAIG3-RFI-SW-S-3695 01 KAIG3-RFI-SW-S-3695-01
KAIG3-RFI-SW-LS-0510 00 KAIG3-RFI-SW-LS-0510-00
KAIG3-RFI-SW-C-0806 00 KAIG3-RFI-SW-C-0806-00
KAIG3-RFI-SW-C-0805 00 KAIG3-RFI-SW-C-0805-00
KAIG3-RFI-PA-C-0804 00 KAIG3-RFI-PA-C-0804-00
KAIG3-RFI-PA-C-0803 00 KAIG3-RFI-PA-C-0803-00
KAIG3-RFI-AG-S-4813 00 KAIG3-RFI-AG-S-4813-00
KAIG3-RFI-AG-S-4812 00 KAIG3-RFI-AG-S-4812-00
KAIG3-RFI-AG-S-4811 00 KAIG3-RFI-AG-S-4811-00
KAIG3-RFI-AG-S-4810 00 KAIG3-RFI-AG-S-4810-00
KAIG3-RFI-SG-S-4794 00 KAIG3-RFI-SG-S-4794-00
KAIG3-RFI-SG-SU-1722 00 KAIG3-RFI-SG-SU-1722-00
KAIG3-RFI-SW-C-0813 00 KAIG3-RFI-SW-C-0813-00
KAIG3-RFI-SW-C-0802 00 KAIG3-RFI-SW-C-0802-00
KAIG3-RFI-SW-C-0801 00 KAIG3-RFI-SW-C-0801-00
KAIG3-RFI-SW-C-0796 00 KAIG3-RFI-SW-C-0796-00
KAIG3-RFI-MB-M-0148 00 KAIG3-RFI-MB-M-0148-00
KAIG3-RFI-SW-C-0810 00 KAIG3-RFI-SW-C-0810-00
KAIG3-RFI-SW-C-0800 00 KAIG3-RFI-SW-C-0800-00
KAIG3-RFI-SW-C-0799 00 KAIG3-RFI-SW-C-0799-00
KAIG3-RFI-SW-C-0798 00 KAIG3-RFI-SW-C-0798-00
KAIG3-RFI-SW-C-0797 00 KAIG3-RFI-SW-C-0797-00
KAIG3-RFI-CO-SU-1721 00 KAIG3-RFI-CO-SU-1721-00
KAIG3-RFI-CO-S-4793 00 KAIG3-RFI-CO-S-4793-00
KAIG3-RFI-CO-S-4792 00 KAIG3-RFI-CO-S-4792-00
KAIG3-RFI-CO-S-4791 00 KAIG3-RFI-CO-S-4791-00
KAIG3-RFI-CO-S-4790 00 KAIG3-RFI-CO-S-4790-00
KAIG3-RFI-CO-S-4732 01 KAIG3-RFI-CO-S-4732-01
KAIG3-RFI-CO-S-4785 00 KAIG3-RFI-CO-S-4785-00
KAIG3-RFI-CO-S-4784 00 KAIG3-RFI-CO-S-4784-00
KAIG3-RFI-CO-S-4783 00 KAIG3-RFI-CO-S-4783-00
KAIG3-RFI-SG-A-0594 00 KAIG3-RFI-SG-A-0594-00
KAIG3-RFI-SG-A-0593 00 KAIG3-RFI-SG-A-0593-00
KAIG3-RFI-SG-S-4789 00 KAIG3-RFI-SG-S-4789-00
KAIG3-RFI-SG-S-4788 00 KAIG3-RFI-SG-S-4788-00
KAIG3-RFI-SG-S-4787 00 KAIG3-RFI-SG-S-4787-00
KAIG3-RFI-SG-S-4786 00 KAIG3-RFI-SG-S-4786-00
KAIG3-RFI-MB-A-0592 00 KAIG3-RFI-MB-A-0592-00
KAIG3-RFI-CO-SU-1720 00 KAIG3-RFI-CO-SU-1720-00
KAIG3-RFI-CO-S-4782 00 KAIG3-RFI-CO-S-4782-00
KAIG3-RFI-CO-S-4781 00 KAIG3-RFI-CO-S-4781-00
KAIG3-RFI-CO-S-4780 00 KAIG3-RFI-CO-S-4780-00
KAIG3-RFI-SW-C-0795 00 KAIG3-RFI-SW-C-0795-00
KAIG3-RFI-SW-C-0794 00 KAIG3-RFI-SW-C-0794-00
KAIG3-RFI-SW-C-0793 00 KAIG3-RFI-SW-C-0793-00
KAIG3-RFI-CO-S-4779 00 KAIG3-RFI-CO-S-4779-00
KAIG3-RFI-SW-C-0792 00 KAIG3-RFI-SW-C-0792-00
KAIG3-RFI-SW-C-0791 00 KAIG3-RFI-SW-C-0791-00
KAIG3-RFI-CO-S-4778 00 KAIG3-RFI-CO-S-4778-00
KAIG3-RFI-PG-S-4777 00 KAIG3-RFI-PG-S-4777-00
KAIG3-RFI-PG-S-4776 00 KAIG3-RFI-PG-S-4776-00
KAIG3-RFI-PG-S-4775 00 KAIG3-RFI-PG-S-4775-00
KAIG3-RFI-PG-S-4774 00 KAIG3-RFI-PG-S-4774-00
KAIG3-RFI-MB-LC-0231 00 KAIG3-RFI-MB-LC-0231-00
KAIG3-RFI-MB-E-0261 00 KAIG3-RFI-MB-E-0261-00
KAIG3-RFI-CO-SU-1718 00 KAIG3-RFI-CO-SU-1718-00
KAIG3-RFI-CO-SU-1717 00 KAIG3-RFI-CO-SU-1717-00
KAIG3-RFI-CO-SU-1716 00 KAIG3-RFI-CO-SU-1716-00
KAIG3-RFI-CO-S-4769 00 KAIG3-RFI-CO-S-4769-00
KAIG3-RFI-AG-SU-1717 00 KAIG3-RFI-AG-SU-1717-00
KAIG3-RFI-CO-S-4768 00 KAIG3-RFI-CO-S-4768-00
KAIG3-RFI-CO-S-4767 00 KAIG3-RFI-CO-S-4767-00
KAIG3-RFI-SW-C-0240 01 KAIG3-RFI-SW-C-0240-01
KAIG3-RFI-CO-S-4766 00 KAIG3-RFI-CO-S-4766-00
KAIG3-RFI-SW-C-0790 00 KAIG3-RFI-SW-C-0790-00
KAIG3-RFI-SW-C-0789 00 KAIG3-RFI-SW-C-0789-00
KAIG3-RFI-CO-S-4773 00 KAIG3-RFI-CO-S-4773-00
KAIG3-RFI-SW-C-0788 00 KAIG3-RFI-SW-C-0788-00
KAIG3-RFI-SW-C-0787 00 KAIG3-RFI-SW-C-0787-00
KAIG3-RFI-CO-S-4765 00 KAIG3-RFI-CO-S-4765-00
KAIG3-RFI-SW-C-0786 00 KAIG3-RFI-SW-C-0786-00
KAIG3-RFI-CO-S-4759 00 KAIG3-RFI-CO-S-4759-00
KAIG3-RFI-SW-C-0785 00 KAIG3-RFI-SW-C-0785-00
KAIG3-RFI-PA-C-0784 00 KAIG3-RFI-PA-C-0784-00
KAIG3-RFI-PA-C-0783 00 KAIG3-RFI-PA-C-0783-00
KAIG3-RFI-PA-C-0782 00 KAIG3-RFI-PA-C-0782-00
KAIG3-RFI-PA-C-0781 00 KAIG3-RFI-PA-C-0781-00
KAIG3-RFI-CO-S-4758 00 KAIG3-RFI-CO-S-4758-00
KAIG3-RFI-SG-S-4772 00 KAIG3-RFI-SG-S-4772-00
KAIG3-RFI-CO-S-4757 00 KAIG3-RFI-CO-S-4757-00
KAIG3-RFI-SG-S-4771 00 KAIG3-RFI-SG-S-4771-00
KAIG3-RFI-SG-S-4770 00 KAIG3-RFI-SG-S-4770-00
KAIG3-RFI-MB-A-0591 00 KAIG3-RFI-MB-A-0591-00
KAIG3-RFI-CO-S-4348 01 KAIG3-RFI-CO-S-4348-01
KAIG3-RFI-MB-A-0590 00 KAIG3-RFI-MB-A-0590-00
KAIG3-RFI-MC-S-4522 02 KAIG3-RFI-MC-S-4522-02
KAIG3-RFI-PG-S-4764 00 KAIG3-RFI-PG-S-4764-00
KAIG3-RFI-PG-S-4763 00 KAIG3-RFI-PG-S-4763-00
KAIG3-RFI-PG-S-4762 00 KAIG3-RFI-PG-S-4762-00
KAIG3-RFI-CO-S-4649 01 KAIG3-RFI-CO-S-4649-01
KAIG3-RFI-MB-S-4761 00 KAIG3-RFI-MB-S-4761-00
KAIG3-RFI-MB-S-4760 00 KAIG3-RFI-MB-S-4760-00
KAIG3-RFI-CO-S-4651 01 KAIG3-RFI-CO-S-4651-01
KAIG3-RFI-CO-S-4653 01 KAIG3-RFI-CO-S-4653-01
KAIG3-RFI-CO-S-4654 01 KAIG3-RFI-CO-S-4654-01
KAIG3-RFI-CO-S-4667 01 KAIG3-RFI-CO-S-4667-01
KAIG3-RFI-CO-S-4673 01 KAIG3-RFI-CO-S-4673-01
KAIG3-RFI-CO-S-4748 00 KAIG3-RFI-CO-S-4748-00
KAIG3-RFI-SW-C-0779 00 KAIG3-RFI-SW-C-0779-00
KAIG3-RFI-SW-C-0778 00 KAIG3-RFI-SW-C-0778-00
KAIG3-RFI-PA-C-0777 00 KAIG3-RFI-PA-C-0777-00
KAIG3-RFI-PA-C-0776 00 KAIG3-RFI-PA-C-0776-00
KAIG3-RFI-PA-C-0775 00 KAIG3-RFI-PA-C-0775-00
KAIG3-RFI-PA-C-0774 00 KAIG3-RFI-PA-C-0774-00
KAIG3-RFI-SW-C-0780 00 KAIG3-RFI-SW-C-0780-00
KAIG3-RFI-CO-S-4754 00 KAIG3-RFI-CO-S-4754-00
KAIG3-RFI-SW-C-0760 00 KAIG3-RFI-SW-C-0760-00
KAIG3-RFI-CO-S-4443 02 KAIG3-RFI-CO-S-4443-02
KAIG3-RFI-CO-SU-1715 00 KAIG3-RFI-CO-SU-1715-00
KAIG3-RFI-SW-C-0757 00 KAIG3-RFI-SW-C-0757-00
KAIG3-RFI-SW-C-0756 00 KAIG3-RFI-SW-C-0756-00
KAIG3-RFI-CO-S-4752 00 KAIG3-RFI-CO-S-4752-00
KAIG3-RFI-CO-S-4751 00 KAIG3-RFI-CO-S-4751-00
KAIG3-RFI-CO-S-4645 01 KAIG3-RFI-CO-S-4645-01
KAIG3-RFI-CO-S-4750 00 KAIG3-RFI-CO-S-4750-00
KAIG3-RFI-AG-S-4756 00 KAIG3-RFI-AG-S-4756-00
KAIG3-RFI-CO-S-4747 00 KAIG3-RFI-CO-S-4747-00
KAIG3-RFI-AG-S-4755 00 KAIG3-RFI-AG-S-4755-00
KAIG3-RFI-MB-A-0589 00 KAIG3-RFI-MB-A-0589-00
KAIG3-RFI-SG-S-4753 00 KAIG3-RFI-SG-S-4753-00
KAIG3-RFI-CO-S-4745 00 KAIG3-RFI-CO-S-4745-00
KAIG3-RFI-CO-S-4744 00 KAIG3-RFI-CO-S-4744-00
KAIG3-RFI-CO-S-4743 00 KAIG3-RFI-CO-S-4743-00
KAIG3-RFI-CO-S-4742 00 KAIG3-RFI-CO-S-4742-00
KAIG3-RFI-CO-S-4741 00 KAIG3-RFI-CO-S-4741-00
KAIG3-RFI-CO-S-4740 00 KAIG3-RFI-CO-S-4740-00
KAIG3-RFI-CO-S-4739 00 KAIG3-RFI-CO-S-4739-00
KAIG3-RFI-CO-S-4738 00 KAIG3-RFI-CO-S-4738-00
KAIG3-RFI-CO-S-4737 00 KAIG3-RFI-CO-S-4737-00
KAIG3-RFI-CO-S-4736 00 KAIG3-RFI-CO-S-4736-00
KAIG3-RFI-SG-S-4746 00 KAIG3-RFI-SG-S-4746-00
KAIG3-RFI-CO-SU-1714 00 KAIG3-RFI-CO-SU-1714-00
KAIG3-RFI-SG-A-0588 00 KAIG3-RFI-SG-A-0588-00
KAIG3-RFI-SG-LS-0509 00 KAIG3-RFI-SG-LS-0509-00
KAIG3-RFI-CO-SU-1713 00 KAIG3-RFI-CO-SU-1713-00
KAIG3-RFI-SG-LS-0508 00 KAIG3-RFI-SG-LS-0508-00
KAIG3-RFI-CO-SU-1712 00 KAIG3-RFI-CO-SU-1712-00
KAIG3-RFI-WG-LS-0507 00 KAIG3-RFI-WG-LS-0507-00
KAIG3-RFI-CO-SU-1711 00 KAIG3-RFI-CO-SU-1711-00
KAIG3-RFI-SW-C-0773 00 KAIG3-RFI-SW-C-0773-00
KAIG3-RFI-WG-LS-0506 00 KAIG3-RFI-WG-LS-0506-00
KAIG3-RFI-SW-C-0772 00 KAIG3-RFI-SW-C-0772-00
KAIG3-RFI-WG-LS-0502 01 KAIG3-RFI-WG-LS-0502-01
KAIG3-RFI-SW-C-0766 00 KAIG3-RFI-SW-C-0766-00
KAIG3-RFI-PG-S-4735 00 KAIG3-RFI-PG-S-4735-00
KAIG3-RFI-PA-C-0771 00 KAIG3-RFI-PA-C-0771-00
KAIG3-RFI-PG-SU-1701 00 KAIG3-RFI-PG-SU-1701-00
KAIG3-RFI-PA-C-0770 00 KAIG3-RFI-PA-C-0770-00
KAIG3-RFI-MB-S-4734 00 KAIG3-RFI-MB-S-4734-00
KAIG3-RFI-MB-S-4733 00 KAIG3-RFI-MB-S-4733-00
KAIG3-RFI-PA-C-0769 00 KAIG3-RFI-PA-C-0769-00
KAIG3-RFI-WG-C-0768 00 KAIG3-RFI-WG-C-0768-00
KAIG3-RFI-WG-C-0767 00 KAIG3-RFI-WG-C-0767-00
KAIG3-RFI-MB-A-0587 00 KAIG3-RFI-MB-A-0587-00
KAIG3-RFI-FC-M-0147 00 KAIG3-RFI-FC-M-0147-00
KAIG3-RFI-SW-C-0765 00 KAIG3-RFI-SW-C-0765-00
KAIG3-RFI-SW-C-0764 00 KAIG3-RFI-SW-C-0764-00
KAIG3-RFI-PA-C-0763 00 KAIG3-RFI-PA-C-0763-00
KAIG3-RFI-PA-C-0762 00 KAIG3-RFI-PA-C-0762-00
KAIG3-RFI-PA-C-0761 00 KAIG3-RFI-PA-C-0761-00
KAIG3-RFI-CO-S-4732 00 KAIG3-RFI-CO-S-4732-00
KAIG3-RFI-CO-S-4731 00 KAIG3-RFI-CO-S-4731-00
KAIG3-RFI-CO-S-4730 00 KAIG3-RFI-CO-S-4730-00
KAIG3-RFI-CO-S-4729 00 KAIG3-RFI-CO-S-4729-00
KAIG3-RFI-CO-S-4728 00 KAIG3-RFI-CO-S-4728-00
KAIG3-RFI-CO-S-4727 00 KAIG3-RFI-CO-S-4727-00
KAIG3-RFI-CO-S-4726 00 KAIG3-RFI-CO-S-4726-00
KAIG3-RFI-CO-S-4725 00 KAIG3-RFI-CO-S-4725-00
KAIG3-RFI-MB-M-0143 02 KAIG3-RFI-MB-M-0143-02
KAIG3-RFI-CO-SU-1710 00 KAIG3-RFI-CO-SU-1710-00
KAIG3-RFI-MB-M-0142 01 KAIG3-RFI-MB-M-0142-01
KAIG3-RFI-CO-SU-1689 01 KAIG3-RFI-CO-SU-1689-01
KAIG3-RFI-CO-S-4633 01 KAIG3-RFI-CO-S-4633-01
KAIG3-RFI-CO-S-4632 01 KAIG3-RFI-CO-S-4632-01
KAIG3-RFI-MC-S-4620 01 KAIG3-RFI-MC-S-4620-01
KAIG3-RFI-CO-S-4619 01 KAIG3-RFI-CO-S-4619-01
KAIG3-RFI-CO-S-4616 01 KAIG3-RFI-CO-S-4616-01
KAIG3-RFI-CO-S-4601 01 KAIG3-RFI-CO-S-4601-01
KAIG3-RFI-BO-A-0170 02 KAIG3-RFI-BO-A-0170-02
KAIG3-RFI-SG-A-0586 00 KAIG3-RFI-SG-A-0586-00
KAIG3-RFI-SG-A-0585 00 KAIG3-RFI-SG-A-0585-00
KAIG3-RFI-SG-A-0584 00 KAIG3-RFI-SG-A-0584-00
KAIG3-RFI-MB-A-0568 01 KAIG3-RFI-MB-A-0568-01
KAIG3-RFI-MB-A-0583 00 KAIG3-RFI-MB-A-0583-00
KAIG3-RFI-MB-A-0582 00 KAIG3-RFI-MB-A-0582-00
KAIG3-RFI-WG-S-4724 00 KAIG3-RFI-WG-S-4724-00
KAIG3-RFI-WG-S-4723 00 KAIG3-RFI-WG-S-4723-00
KAIG3-RFI-WG-S-4722 00 KAIG3-RFI-WG-S-4722-00
KAIG3-RFI-WG-S-4721 00 KAIG3-RFI-WG-S-4721-00
KAIG3-RFI-WG-S-4720 00 KAIG3-RFI-WG-S-4720-00
KAIG3-RFI-WG-S-4719 00 KAIG3-RFI-WG-S-4719-00
KAIG3-RFI-PG-C-0750 00 KAIG3-RFI-PG-C-0750-00
KAIG3-RFI-SW-C-0749 00 KAIG3-RFI-SW-C-0749-00
KAIG3-RFI-SW-C-0748 00 KAIG3-RFI-SW-C-0748-00
KAIG3-RFI-SW-C-0747 00 KAIG3-RFI-SW-C-0747-00
KAIG3-RFI-SW-C-0746 00 KAIG3-RFI-SW-C-0746-00
KAIG3-RFI-SW-C-0745 00 KAIG3-RFI-SW-C-0745-00
KAIG3-RFI-SW-C-0744 00 KAIG3-RFI-SW-C-0744-00
KAIG3-RFI-SW-C-0743 00 KAIG3-RFI-SW-C-0743-00
KAIG3-RFI-PA-LS-0505 00 KAIG3-RFI-PA-LS-0505-00
KAIG3-RFI-SW-C-0755 00 KAIG3-RFI-SW-C-0755-00
KAIG3-RFI-SW-C-0754 00 KAIG3-RFI-SW-C-0754-00
KAIG3-RFI-SW-C-0753 00 KAIG3-RFI-SW-C-0753-00
KAIG3-RFI-SW-C-0752 00 KAIG3-RFI-SW-C-0752-00
KAIG3-RFI-SG-S-4607 01 KAIG3-RFI-SG-S-4607-01
KAIG3-RFI-WG-C-0751 00 KAIG3-RFI-WG-C-0751-00
KAIG3-RFI-MB-A-0581 00 KAIG3-RFI-MB-A-0581-00
KAIG3-RFI-CO-S-4718 00 KAIG3-RFI-CO-S-4718-00
KAIG3-RFI-CO-S-4717 00 KAIG3-RFI-CO-S-4717-00
KAIG3-RFI-CO-S-4716 00 KAIG3-RFI-CO-S-4716-00
KAIG3-RFI-CO-S-4715 00 KAIG3-RFI-CO-S-4715-00
KAIG3-RFI-CO-S-4714 00 KAIG3-RFI-CO-S-4714-00
KAIG3-RFI-CO-SU-1709 00 KAIG3-RFI-CO-SU-1709-00
KAIG3-RFI-PT-M-0146 00 KAIG3-RFI-PT-M-0146-00
KAIG3-RFI-PT-M-0145 00 KAIG3-RFI-PT-M-0145-00
KAIG3-RFI-PT-M-0144 00 KAIG3-RFI-PT-M-0144-00
KAIG3-RFI-PA-C-0742 00 KAIG3-RFI-PA-C-0742-00
KAIG3-RFI-PA-C-0741 00 KAIG3-RFI-PA-C-0741-00
KAIG3-RFI-CO-SU-1708 00 KAIG3-RFI-CO-SU-1708-00
KAIG3-RFI-CO-SU-1707 00 KAIG3-RFI-CO-SU-1707-00
KAIG3-RFI-CO-S-4709 00 KAIG3-RFI-CO-S-4709-00
KAIG3-RFI-CO-S-4708 00 KAIG3-RFI-CO-S-4708-00
KAIG3-RFI-CO-S-4707 00 KAIG3-RFI-CO-S-4707-00
KAIG3-RFI-CO-S-4706 00 KAIG3-RFI-CO-S-4706-00
KAIG3-RFI-CO-S-4605 01 KAIG3-RFI-CO-S-4605-01
KAIG3-RFI-CO-S-4604 00 KAIG3-RFI-CO-S-4604-00
KAIG3-RFI-SG-S-4713 00 KAIG3-RFI-SG-S-4713-00
KAIG3-RFI-WG-C-0735 00 KAIG3-RFI-WG-C-0735-00
KAIG3-RFI-PG-S-4712 00 KAIG3-RFI-PG-S-4712-00
KAIG3-RFI-PG-S-4711 00 KAIG3-RFI-PG-S-4711-00
KAIG3-RFI-PG-S-4710 00 KAIG3-RFI-PG-S-4710-00
KAIG3-RFI-CO-S-4705 00 KAIG3-RFI-CO-S-4705-00
KAIG3-RFI-CO-S-4704 00 KAIG3-RFI-CO-S-4704-00
KAIG3-RFI-SW-C-0740 00 KAIG3-RFI-SW-C-0740-00
KAIG3-RFI-PA-C-0739 00 KAIG3-RFI-PA-C-0739-00
KAIG3-RFI-SW-C-0738 00 KAIG3-RFI-SW-C-0738-00
KAIG3-RFI-CO-S-4703 00 KAIG3-RFI-CO-S-4703-00
KAIG3-RFI-SW-C-0737 00 KAIG3-RFI-SW-C-0737-00
KAIG3-RFI-CO-S-4702 00 KAIG3-RFI-CO-S-4702-00
KAIG3-RFI-SW-C-0736 00 KAIG3-RFI-SW-C-0736-00
KAIG3-RFI-CO-S-4701 00 KAIG3-RFI-CO-S-4701-00
KAIG3-RFI-CO-S-4700 00 KAIG3-RFI-CO-S-4700-00
KAIG3-RFI-CO-S-4699 00 KAIG3-RFI-CO-S-4699-00
KAIG3-RFI-CO-S-4698 00 KAIG3-RFI-CO-S-4698-00
KAIG3-RFI-CO-S-4697 00 KAIG3-RFI-CO-S-4697-00
KAIG3-RFI-CO-S-4696 00 KAIG3-RFI-CO-S-4696-00
KAIG3-RFI-CO-S-4695 00 KAIG3-RFI-CO-S-4695-00
KAIG3-RFI-CO-S-4544 01 KAIG3-RFI-CO-S-4544-01
KAIG3-RFI-CO-S-4694 00 KAIG3-RFI-CO-S-4694-00
KAIG3-RFI-CO-SU-1706 00 KAIG3-RFI-CO-SU-1706-00
KAIG3-RFI-CO-SU-1705 00 KAIG3-RFI-CO-SU-1705-00
KAIG3-RFI-CO-SU-1704 00 KAIG3-RFI-CO-SU-1704-00
KAIG3-RFI-CO-SU-1686 01 KAIG3-RFI-CO-SU-1686-01
KAIG3-RFI-MB-A-0580 00 KAIG3-RFI-MB-A-0580-00
KAIG3-RFI-WG-S-4685 00 KAIG3-RFI-WG-S-4685-00
KAIG3-RFI-WG-S-4684 00 KAIG3-RFI-WG-S-4684-00
KAIG3-RFI-PG-S-4690 00 KAIG3-RFI-PG-S-4690-00
KAIG3-RFI-PG-S-4689 00 KAIG3-RFI-PG-S-4689-00
KAIG3-RFI-PG-S-4688 00 KAIG3-RFI-PG-S-4688-00
KAIG3-RFI-PG-S-4687 00 KAIG3-RFI-PG-S-4687-00
KAIG3-RFI-AG-S-4686 00 KAIG3-RFI-AG-S-4686-00
KAIG3-RFI-WG-S-4683 00 KAIG3-RFI-WG-S-4683-00
KAIG3-RFI-WG-S-4682 00 KAIG3-RFI-WG-S-4682-00
KAIG3-RFI-WG-S-4681 00 KAIG3-RFI-WG-S-4681-00
KAIG3-RFI-WG-S-4680 00 KAIG3-RFI-WG-S-4680-00
KAIG3-RFI-WG-S-4679 00 KAIG3-RFI-WG-S-4679-00
KAIG3-RFI-MB-A-0579 00 KAIG3-RFI-MB-A-0579-00
KAIG3-RFI-PA-C-0734 00 KAIG3-RFI-PA-C-0734-00
KAIG3-RFI-PA-C-0733 00 KAIG3-RFI-PA-C-0733-00
KAIG3-RFI-PA-C-0732 00 KAIG3-RFI-PA-C-0732-00
KAIG3-RFI-SW-C-0731 00 KAIG3-RFI-SW-C-0731-00
KAIG3-RFI-PA-C-0730 00 KAIG3-RFI-PA-C-0730-00
KAIG3-RFI-PA-C-0729 00 KAIG3-RFI-PA-C-0729-00
KAIG3-RFI-PA-C-0728 00 KAIG3-RFI-PA-C-0728-00
KAIG3-RFI-PA-C-0724 00 KAIG3-RFI-PA-C-0724-00
KAIG3-RFI-PA-C-0723 00 KAIG3-RFI-PA-C-0723-00
KAIG3-RFI-CO-SU-1703 00 KAIG3-RFI-CO-SU-1703-00
KAIG3-RFI-CO-SU-1702 00 KAIG3-RFI-CO-SU-1702-00
KAIG3-RFI-CO-S-4693 00 KAIG3-RFI-CO-S-4693-00
KAIG3-RFI-CO-S-4692 00 KAIG3-RFI-CO-S-4692-00
KAIG3-RFI-CO-S-4691 00 KAIG3-RFI-CO-S-4691-00
KAIG3-RFI-CO-S-4678 00 KAIG3-RFI-CO-S-4678-00
KAIG3-RFI-MB-A-0578 00 KAIG3-RFI-MB-A-0578-00
KAIG3-RFI-CO-SU-1700 00 KAIG3-RFI-CO-SU-1700-00
KAIG3-RFI-CO-SU-1699 00 KAIG3-RFI-CO-SU-1699-00
KAIG3-RFI-CO-S-4677 00 KAIG3-RFI-CO-S-4677-00
KAIG3-RFI-CO-S-4676 00 KAIG3-RFI-CO-S-4676-00
KAIG3-RFI-CO-S-4673 00 KAIG3-RFI-CO-S-4673-00
KAIG3-RFI-CO-S-4672 00 KAIG3-RFI-CO-S-4672-00
KAIG3-RFI-CO-S-4671 00 KAIG3-RFI-CO-S-4671-00
KAIG3-RFI-WG-S-4486 01 KAIG3-RFI-WG-S-4486-01
KAIG3-RFI-AG-S-4675 00 KAIG3-RFI-AG-S-4675-00
KAIG3-RFI-AG-S-4674 00 KAIG3-RFI-AG-S-4674-00
KAIG3-RFI-WG-S-4670 00 KAIG3-RFI-WG-S-4670-00
KAIG3-RFI-WG-S-4669 00 KAIG3-RFI-WG-S-4669-00
KAIG3-RFI-WG-S-4668 00 KAIG3-RFI-WG-S-4668-00
KAIG3-RFI-WG-S-4664 00 KAIG3-RFI-WG-S-4664-00
KAIG3-RFI-AG-S-4540 01 KAIG3-RFI-AG-S-4540-01
KAIG3-RFI-PA-C-0727 00 KAIG3-RFI-PA-C-0727-00
KAIG3-RFI-SW-C-0726 00 KAIG3-RFI-SW-C-0726-00
KAIG3-RFI-SW-C-0725 00 KAIG3-RFI-SW-C-0725-00
KAIG3-RFI-PA-C-0722 00 KAIG3-RFI-PA-C-0722-00
KAIG3-RFI-PA-C-0721 00 KAIG3-RFI-PA-C-0721-00
KAIG3-RFI-PA-C-0720 00 KAIG3-RFI-PA-C-0720-00
KAIG3-RFI-MB-M-0143 01 KAIG3-RFI-MB-M-0143-01
KAIG3-RFI-MB-LC-0230 00 KAIG3-RFI-MB-LC-0230-00
KAIG3-RFI-CO-SU-1698 00 KAIG3-RFI-CO-SU-1698-00
KAIG3-RFI-CO-SU-1697 00 KAIG3-RFI-CO-SU-1697-00
KAIG3-RFI-CO-SU-1696 00 KAIG3-RFI-CO-SU-1696-00
KAIG3-RFI-CO-SU-1691 00 KAIG3-RFI-CO-SU-1691-00
KAIG3-RFI-CO-S-4667 00 KAIG3-RFI-CO-S-4667-00
KAIG3-RFI-CO-S-4666 00 KAIG3-RFI-CO-S-4666-00
KAIG3-RFI-CO-S-4665 00 KAIG3-RFI-CO-S-4665-00
KAIG3-RFI-CO-S-4659 00 KAIG3-RFI-CO-S-4659-00
KAIG3-RFI-CO-S-4658 00 KAIG3-RFI-CO-S-4658-00
KAIG3-RFI-CO-S-4657 00 KAIG3-RFI-CO-S-4657-00
KAIG3-RFI-SG-SU-1695 00 KAIG3-RFI-SG-SU-1695-00
KAIG3-RFI-SG-S-4663 00 KAIG3-RFI-SG-S-4663-00
KAIG3-RFI-SG-SU-1694 00 KAIG3-RFI-SG-SU-1694-00
KAIG3-RFI-SG-S-4662 00 KAIG3-RFI-SG-S-4662-00
KAIG3-RFI-SG-S-4609 01 KAIG3-RFI-SG-S-4609-01
KAIG3-RFI-SG-S-4660 00 KAIG3-RFI-SG-S-4660-00
KAIG3-RFI-SG-SU-1692 00 KAIG3-RFI-SG-SU-1692-00
KAIG3-RFI-PG-S-4661 00 KAIG3-RFI-PG-S-4661-00
KAIG3-RFI-PG-SU-1693 00 KAIG3-RFI-PG-SU-1693-00
KAIG3-RFI-PG-C-0640 01 KAIG3-RFI-PG-C-0640-01
KAIG3-RFI-MB-LC-0229 00 KAIG3-RFI-MB-LC-0229-00
KAIG3-RFI-CO-SU-1690 00 KAIG3-RFI-CO-SU-1690-00
KAIG3-RFI-CO-SU-1689 00 KAIG3-RFI-CO-SU-1689-00
KAIG3-RFI-SW-C-0718 00 KAIG3-RFI-SW-C-0718-00
KAIG3-RFI-CO-SU-1688 00 KAIG3-RFI-CO-SU-1688-00
KAIG3-RFI-PA-C-0717 00 KAIG3-RFI-PA-C-0717-00
KAIG3-RFI-CO-SU-1687 00 KAIG3-RFI-CO-SU-1687-00
KAIG3-RFI-PA-C-0716 00 KAIG3-RFI-PA-C-0716-00
KAIG3-RFI-CO-SU-1686 00 KAIG3-RFI-CO-SU-1686-00
KAIG3-RFI-PA-C-0715 00 KAIG3-RFI-PA-C-0715-00
KAIG3-RFI-PA-C-0712 00 KAIG3-RFI-PA-C-0712-00
KAIG3-RFI-CO-SU-1685 00 KAIG3-RFI-CO-SU-1685-00
KAIG3-RFI-PA-C-0711 00 KAIG3-RFI-PA-C-0711-00
KAIG3-RFI-CO-S-4656 00 KAIG3-RFI-CO-S-4656-00
KAIG3-RFI-PA-C-0710 00 KAIG3-RFI-PA-C-0710-00
KAIG3-RFI-CO-S-4654 00 KAIG3-RFI-CO-S-4654-00
KAIG3-RFI-PA-C-0709 00 KAIG3-RFI-PA-C-0709-00
KAIG3-RFI-PA-C-0708 00 KAIG3-RFI-PA-C-0708-00
KAIG3-RFI-CO-S-4653 00 KAIG3-RFI-CO-S-4653-00
KAIG3-RFI-CO-S-4652 00 KAIG3-RFI-CO-S-4652-00
KAIG3-RFI-CO-S-4651 00 KAIG3-RFI-CO-S-4651-00
KAIG3-RFI-CO-S-4650 00 KAIG3-RFI-CO-S-4650-00
KAIG3-RFI-CO-S-4649 00 KAIG3-RFI-CO-S-4649-00
KAIG3-RFI-CO-S-4648 00 KAIG3-RFI-CO-S-4648-00
KAIG3-RFI-CO-S-4434 01 KAIG3-RFI-CO-S-4434-01
KAIG3-RFI-CO-S-4462 01 KAIG3-RFI-CO-S-4462-01
KAIG3-RFI-CO-S-4526 01 KAIG3-RFI-CO-S-4526-01
KAIG3-RFI-CO-S-4477 01 KAIG3-RFI-CO-S-4477-01
KAIG3-RFI-CO-S-4645 00 KAIG3-RFI-CO-S-4645-00
KAIG3-RFI-CO-S-4644 00 KAIG3-RFI-CO-S-4644-00
KAIG3-RFI-CO-S-4643 00 KAIG3-RFI-CO-S-4643-00
KAIG3-RFI-CO-S-4642 00 KAIG3-RFI-CO-S-4642-00
KAIG3-RFI-CO-S-4641 00 KAIG3-RFI-CO-S-4641-00
KAIG3-RFI-CO-S-4640 00 KAIG3-RFI-CO-S-4640-00
KAIG3-RFI-CO-S-4639 00 KAIG3-RFI-CO-S-4639-00
KAIG3-RFI-MB-A-0577 00 KAIG3-RFI-MB-A-0577-00
KAIG3-RFI-AG-S-4647 00 KAIG3-RFI-AG-S-4647-00
KAIG3-RFI-AG-S-4646 00 KAIG3-RFI-AG-S-4646-00
KAIG3-RFI-MB-A-0576 00 KAIG3-RFI-MB-A-0576-00
KAIG3-RFI-DG-C-0714 00 KAIG3-RFI-DG-C-0714-00
KAIG3-RFI-PG-C-0707 00 KAIG3-RFI-PG-C-0707-00
KAIG3-RFI-PG-C-0713 00 KAIG3-RFI-PG-C-0713-00
KAIG3-RFI-SG-LC-0173 01 KAIG3-RFI-SG-LC-0173-01
KAIG3-RFI-SG-LC-0172 01 KAIG3-RFI-SG-LC-0172-01
KAIG3-RFI-SG-LC-0171 01 KAIG3-RFI-SG-LC-0171-01
KAIG3-RFI-SW-C-0706 00 KAIG3-RFI-SW-C-0706-00
KAIG3-RFI-PA-C-0680 01 KAIG3-RFI-PA-C-0680-01
KAIG3-RFI-CO-S-4638 00 KAIG3-RFI-CO-S-4638-00
KAIG3-RFI-CO-S-4637 00 KAIG3-RFI-CO-S-4637-00
KAIG3-RFI-CO-S-4554 00 KAIG3-RFI-CO-S-4554-00
KAIG3-RFI-CO-S-4599 00 KAIG3-RFI-CO-S-4599-00
KAIG3-RFI-SG-S-4636 00 KAIG3-RFI-SG-S-4636-00
KAIG3-RFI-CO-S-4557 00 KAIG3-RFI-CO-S-4557-00
KAIG3-RFI-CO-S-4558 00 KAIG3-RFI-CO-S-4558-00
KAIG3-RFI-CO-S-4564 00 KAIG3-RFI-CO-S-4564-00
KAIG3-RFI-CO-S-4551 00 KAIG3-RFI-CO-S-4551-00
KAIG3-RFI-CO-S-4565 00 KAIG3-RFI-CO-S-4565-00
KAIG3-RFI-CO-S-4563 00 KAIG3-RFI-CO-S-4563-00
KAIG3-RFI-MC-S-4635 00 KAIG3-RFI-MC-S-4635-00
KAIG3-RFI-MC-S-4634 00 KAIG3-RFI-MC-S-4634-00
KAIG3-RFI-CO-S-4633 00 KAIG3-RFI-CO-S-4633-00
KAIG3-RFI-CO-S-4632 00 KAIG3-RFI-CO-S-4632-00
KAIG3-RFI-SW-C-0704 00 KAIG3-RFI-SW-C-0704-00
KAIG3-RFI-SW-C-0703 00 KAIG3-RFI-SW-C-0703-00
KAIG3-RFI-SW-C-0702 00 KAIG3-RFI-SW-C-0702-00
KAIG3-RFI-SW-C-0701 00 KAIG3-RFI-SW-C-0701-00
KAIG3-RFI-PA-C-0694 00 KAIG3-RFI-PA-C-0694-00
KAIG3-RFI-PA-C-0693 00 KAIG3-RFI-PA-C-0693-00
KAIG3-RFI-PA-C-0692 00 KAIG3-RFI-PA-C-0692-00
KAIG3-RFI-SW-C-0691 00 KAIG3-RFI-SW-C-0691-00
KAIG3-RFI-SW-C-0690 00 KAIG3-RFI-SW-C-0690-00
KAIG3-RFI-SG-S-4572 01 KAIG3-RFI-SG-S-4572-01
KAIG3-RFI-SG-S-4541 01 KAIG3-RFI-SG-S-4541-01
KAIG3-RFI-AG-SU-1666 01 KAIG3-RFI-AG-SU-1666-01
KAIG3-RFI-MB-A-0575 00 KAIG3-RFI-MB-A-0575-00
KAIG3-RFI-PG-LS-0504 00 KAIG3-RFI-PG-LS-0504-00
KAIG3-RFI-WG-LS-0503 00 KAIG3-RFI-WG-LS-0503-00
KAIG3-RFI-WG-LS-0502 00 KAIG3-RFI-WG-LS-0502-00
KAIG3-RFI-WG-S-4626 00 KAIG3-RFI-WG-S-4626-00
KAIG3-RFI-WG-S-4625 00 KAIG3-RFI-WG-S-4625-00
KAIG3-RFI-CO-S-4631 00 KAIG3-RFI-CO-S-4631-00
KAIG3-RFI-CO-S-4630 00 KAIG3-RFI-CO-S-4630-00
KAIG3-RFI-CO-S-4629 00 KAIG3-RFI-CO-S-4629-00
KAIG3-RFI-CO-S-4309 02 KAIG3-RFI-CO-S-4309-02
KAIG3-RFI-CO-S-4628 00 KAIG3-RFI-CO-S-4628-00
KAIG3-RFI-CO-S-4627 00 KAIG3-RFI-CO-S-4627-00
KAIG3-RFI-MC-S-4522 01 KAIG3-RFI-MC-S-4522-01
KAIG3-RFI-MC-S-4521 01 KAIG3-RFI-MC-S-4521-01
KAIG3-RFI-CO-SU-1683 00 KAIG3-RFI-CO-SU-1683-00
KAIG3-RFI-CO-SU-1682 00 KAIG3-RFI-CO-SU-1682-00
KAIG3-RFI-CO-SU-1684 00 KAIG3-RFI-CO-SU-1684-00
KAIG3-RFI-MC-SU-1660 01 KAIG3-RFI-MC-SU-1660-01
KAIG3-RFI-MB-M-0143 00 KAIG3-RFI-MB-M-0143-00
KAIG3-RFI-MB-M-0142 00 KAIG3-RFI-MB-M-0142-00
KAIG3-RFI-MB-LC-0217 01 KAIG3-RFI-MB-LC-0217-01
KAIG3-RFI-SW-C-0699 00 KAIG3-RFI-SW-C-0699-00
KAIG3-RFI-SW-C-0698 00 KAIG3-RFI-SW-C-0698-00
KAIG3-RFI-SW-C-0697 00 KAIG3-RFI-SW-C-0697-00
KAIG3-RFI-SW-C-0696 00 KAIG3-RFI-SW-C-0696-00
KAIG3-RFI-SW-C-0695 00 KAIG3-RFI-SW-C-0695-00
KAIG3-RFI-SW-C-0329 02 KAIG3-RFI-SW-C-0329-02
KAIG3-RFI-SW-C-0322 01 KAIG3-RFI-SW-C-0322-01
KAIG3-RFI-MB-LC-0228 00 KAIG3-RFI-MB-LC-0228-00
KAIG3-RFI-MB-LC-0227 00 KAIG3-RFI-MB-LC-0227-00
KAIG3-RFI-CO-S-4593 00 KAIG3-RFI-CO-S-4593-00
KAIG3-RFI-CO-S-4591 00 KAIG3-RFI-CO-S-4591-00
KAIG3-RFI-CO-SS-0001 00 KAIG3-RFI-CO-SS-0001-00
KAIG3-RFI-MB-LC-0226 00 KAIG3-RFI-MB-LC-0226-00
KAIG3-RFI-MB-LC-0225 00 KAIG3-RFI-MB-LC-0225-00
KAIG3-RFI-SW-C-0687 00 KAIG3-RFI-SW-C-0687-00
KAIG3-RFI-SW-C-0686 00 KAIG3-RFI-SW-C-0686-00
KAIG3-RFI-PA-C-0685 00 KAIG3-RFI-PA-C-0685-00
KAIG3-RFI-PA-C-0684 00 KAIG3-RFI-PA-C-0684-00
KAIG3-RFI-AG-S-4540 00 KAIG3-RFI-AG-S-4540-00
KAIG3-RFI-MB-A-0574 00 KAIG3-RFI-MB-A-0574-00
KAIG3-RFI-MB-S-4613 00 KAIG3-RFI-MB-S-4613-00
KAIG3-RFI-MB-S-4612 00 KAIG3-RFI-MB-S-4612-00
KAIG3-RFI-WG-S-4611 00 KAIG3-RFI-WG-S-4611-00
KAIG3-RFI-WG-S-4610 00 KAIG3-RFI-WG-S-4610-00
KAIG3-RFI-SG-S-4609 00 KAIG3-RFI-SG-S-4609-00
KAIG3-RFI-SG-S-4608 00 KAIG3-RFI-SG-S-4608-00
KAIG3-RFI-SG-S-4607 00 KAIG3-RFI-SG-S-4607-00
KAIG3-RFI-CO-C-0689 00 KAIG3-RFI-CO-C-0689-00
KAIG3-RFI-CO-C-0688 00 KAIG3-RFI-CO-C-0688-00
KAIG3-RFI-MC-SU-1680 00 KAIG3-RFI-MC-SU-1680-00
KAIG3-RFI-MC-SU-1679 00 KAIG3-RFI-MC-SU-1679-00
KAIG3-RFI-CO-SU-1678 00 KAIG3-RFI-CO-SU-1678-00
KAIG3-RFI-CO-S-4624 00 KAIG3-RFI-CO-S-4624-00
KAIG3-RFI-CO-S-4622 00 KAIG3-RFI-CO-S-4622-00
KAIG3-RFI-MC-S-4621 00 KAIG3-RFI-MC-S-4621-00
KAIG3-RFI-MC-S-4620 00 KAIG3-RFI-MC-S-4620-00
KAIG3-RFI-CO-S-4619 00 KAIG3-RFI-CO-S-4619-00
KAIG3-RFI-CO-S-4618 00 KAIG3-RFI-CO-S-4618-00
KAIG3-RFI-CO-S-4617 00 KAIG3-RFI-CO-S-4617-00
KAIG3-RFI-CO-S-4616 00 KAIG3-RFI-CO-S-4616-00
KAIG3-RFI-CO-S-4615 00 KAIG3-RFI-CO-S-4615-00
KAIG3-RFI-CO-S-4614 00 KAIG3-RFI-CO-S-4614-00
KAIG3-RFI-MB-LC-0224 00 KAIG3-RFI-MB-LC-0224-00
KAIG3-RFI-PA-C-0683 00 KAIG3-RFI-PA-C-0683-00
KAIG3-RFI-PA-C-0680 00 KAIG3-RFI-PA-C-0680-00
KAIG3-RFI-SW-C-0679 00 KAIG3-RFI-SW-C-0679-00
KAIG3-RFI-SW-C-0678 00 KAIG3-RFI-SW-C-0678-00
KAIG3-RFI-SW-C-0677 00 KAIG3-RFI-SW-C-0677-00
KAIG3-RFI-SW-C-0676 00 KAIG3-RFI-SW-C-0676-00
KAIG3-RFI-PA-C-0675 00 KAIG3-RFI-PA-C-0675-00
KAIG3-RFI-PA-C-0674 00 KAIG3-RFI-PA-C-0674-00
KAIG3-RFI-WG-A-0573 00 KAIG3-RFI-WG-A-0573-00
KAIG3-RFI-WG-A-0572 00 KAIG3-RFI-WG-A-0572-00
KAIG3-RFI-PG-C-0681 00 KAIG3-RFI-PG-C-0681-00
KAIG3-RFI-MB-A-0571 00 KAIG3-RFI-MB-A-0571-00
KAIG3-RFI-MB-S-4598 00 KAIG3-RFI-MB-S-4598-00
KAIG3-RFI-MB-S-4597 00 KAIG3-RFI-MB-S-4597-00
KAIG3-RFI-MB-A-0570 00 KAIG3-RFI-MB-A-0570-00
KAIG3-RFI-MB-A-0569 00 KAIG3-RFI-MB-A-0569-00
KAIG3-RFI-SG-S-4596 00 KAIG3-RFI-SG-S-4596-00
KAIG3-RFI-SG-S-4595 00 KAIG3-RFI-SG-S-4595-00
KAIG3-RFI-CO-S-4606 00 KAIG3-RFI-CO-S-4606-00
KAIG3-RFI-CO-S-4605 00 KAIG3-RFI-CO-S-4605-00
KAIG3-RFI-CO-S-4603 00 KAIG3-RFI-CO-S-4603-00
KAIG3-RFI-CO-S-4602 00 KAIG3-RFI-CO-S-4602-00
KAIG3-RFI-CO-S-4601 00 KAIG3-RFI-CO-S-4601-00
KAIG3-RFI-CO-S-4600 00 KAIG3-RFI-CO-S-4600-00
KAIG3-RFI-CO-S-4556 01 KAIG3-RFI-CO-S-4556-01
KAIG3-RFI-CO-S-4555 01 KAIG3-RFI-CO-S-4555-01
KAIG3-RFI-CO-SU-1677 00 KAIG3-RFI-CO-SU-1677-00
KAIG3-RFI-CO-SU-1676 00 KAIG3-RFI-CO-SU-1676-00
KAIG3-RFI-CO-SU-1673 00 KAIG3-RFI-CO-SU-1673-00
KAIG3-RFI-CO-C-0682 00 KAIG3-RFI-CO-C-0682-00
KAIG3-RFI-CO-S-4443 01 KAIG3-RFI-CO-S-4443-01
KAIG3-RFI-CO-S-4442 01 KAIG3-RFI-CO-S-4442-01
KAIG3-RFI-CO-SU-1675 00 KAIG3-RFI-CO-SU-1675-00
KAIG3-RFI-CO-SU-1674 00 KAIG3-RFI-CO-SU-1674-00
KAIG3-RFI-CO-SU-1643 01 KAIG3-RFI-CO-SU-1643-01
KAIG3-RFI-CO-S-4592 00 KAIG3-RFI-CO-S-4592-00
KAIG3-RFI-CO-S-4590 00 KAIG3-RFI-CO-S-4590-00
KAIG3-RFI-CO-S-4589 00 KAIG3-RFI-CO-S-4589-00
KAIG3-RFI-CO-S-4588 00 KAIG3-RFI-CO-S-4588-00
KAIG3-RFI-CO-S-4587 00 KAIG3-RFI-CO-S-4587-00
KAIG3-RFI-CO-S-4586 00 KAIG3-RFI-CO-S-4586-00
KAIG3-RFI-CO-S-4585 00 KAIG3-RFI-CO-S-4585-00
KAIG3-RFI-CO-S-4584 00 KAIG3-RFI-CO-S-4584-00
KAIG3-RFI-CO-S-4583 00 KAIG3-RFI-CO-S-4583-00
KAIG3-RFI-CO-S-4581 00 KAIG3-RFI-CO-S-4581-00
KAIG3-RFI-CO-S-4580 00 KAIG3-RFI-CO-S-4580-00
KAIG3-RFI-SW-C-0671 00 KAIG3-RFI-SW-C-0671-00
KAIG3-RFI-PA-C-0669 00 KAIG3-RFI-PA-C-0669-00
KAIG3-RFI-SW-C-0668 00 KAIG3-RFI-SW-C-0668-00
KAIG3-RFI-PA-C-0667 00 KAIG3-RFI-PA-C-0667-00
KAIG3-RFI-PA-C-0666 00 KAIG3-RFI-PA-C-0666-00
KAIG3-RFI-CO-C-0670 00 KAIG3-RFI-CO-C-0670-00
KAIG3-RFI-CO-S-3654 02 KAIG3-RFI-CO-S-3654-02
KAIG3-RFI-SW-C-0665 00 KAIG3-RFI-SW-C-0665-00
KAIG3-RFI-SW-C-0664 00 KAIG3-RFI-SW-C-0664-00
KAIG3-RFI-SW-C-0469 01 KAIG3-RFI-SW-C-0469-01
KAIG3-RFI-MB-LC-0223 00 KAIG3-RFI-MB-LC-0223-00
KAIG3-RFI-SW-C-0646 00 KAIG3-RFI-SW-C-0646-00
KAIG3-RFI-PA-C-0645 00 KAIG3-RFI-PA-C-0645-00
KAIG3-RFI-SW-C-0661 00 KAIG3-RFI-SW-C-0661-00
KAIG3-RFI-MB-A-0568 00 KAIG3-RFI-MB-A-0568-00
KAIG3-RFI-WG-A-0566 01 KAIG3-RFI-WG-A-0566-01
KAIG3-RFI-WG-A-0565 01 KAIG3-RFI-WG-A-0565-01
KAIG3-RFI-WG-A-0564 01 KAIG3-RFI-WG-A-0564-01
KAIG3-RFI-WG-A-0563 01 KAIG3-RFI-WG-A-0563-01
KAIG3-RFI-WG-LS-0501 00 KAIG3-RFI-WG-LS-0501-00
KAIG3-RFI-WG-LS-0500 00 KAIG3-RFI-WG-LS-0500-00
KAIG3-RFI-MB-A-0567 00 KAIG3-RFI-MB-A-0567-00
KAIG3-RFI-SG-S-4573 00 KAIG3-RFI-SG-S-4573-00
KAIG3-RFI-CO-SU-1671 00 KAIG3-RFI-CO-SU-1671-00
KAIG3-RFI-SG-S-4562 00 KAIG3-RFI-SG-S-4562-00
KAIG3-RFI-SG-S-4561 00 KAIG3-RFI-SG-S-4561-00
KAIG3-RFI-CO-SU-1670 00 KAIG3-RFI-CO-SU-1670-00
KAIG3-RFI-CO-S-4504 01 KAIG3-RFI-CO-S-4504-01
KAIG3-RFI-SG-S-4537 00 KAIG3-RFI-SG-S-4537-00
KAIG3-RFI-CO-S-4503 01 KAIG3-RFI-CO-S-4503-01
KAIG3-RFI-CO-S-4502 01 KAIG3-RFI-CO-S-4502-01
KAIG3-RFI-CO-S-4579 00 KAIG3-RFI-CO-S-4579-00
KAIG3-RFI-CO-S-4578 00 KAIG3-RFI-CO-S-4578-00
KAIG3-RFI-CO-S-4577 00 KAIG3-RFI-CO-S-4577-00
KAIG3-RFI-CO-S-4576 00 KAIG3-RFI-CO-S-4576-00
KAIG3-RFI-CO-S-4575 00 KAIG3-RFI-CO-S-4575-00
KAIG3-RFI-CO-S-4574 00 KAIG3-RFI-CO-S-4574-00
KAIG3-RFI-SW-C-0662 00 KAIG3-RFI-SW-C-0662-00
KAIG3-RFI-SW-C-0660 00 KAIG3-RFI-SW-C-0660-00
KAIG3-RFI-SW-C-0659 00 KAIG3-RFI-SW-C-0659-00
KAIG3-RFI-SW-C-0658 00 KAIG3-RFI-SW-C-0658-00
KAIG3-RFI-SW-C-0657 00 KAIG3-RFI-SW-C-0657-00
KAIG3-RFI-SW-C-0656 00 KAIG3-RFI-SW-C-0656-00
KAIG3-RFI-SW-C-0655 00 KAIG3-RFI-SW-C-0655-00
KAIG3-RFI-SW-C-0654 00 KAIG3-RFI-SW-C-0654-00
KAIG3-RFI-SW-C-0653 00 KAIG3-RFI-SW-C-0653-00
KAIG3-RFI-SW-C-0652 00 KAIG3-RFI-SW-C-0652-00
KAIG3-RFI-SW-C-0651 00 KAIG3-RFI-SW-C-0651-00
KAIG3-RFI-SW-C-0650 00 KAIG3-RFI-SW-C-0650-00
KAIG3-RFI-SW-C-0649 00 KAIG3-RFI-SW-C-0649-00
KAIG3-RFI-SW-C-0648 00 KAIG3-RFI-SW-C-0648-00
KAIG3-RFI-SW-C-0647 00 KAIG3-RFI-SW-C-0647-00
KAIG3-RFI-CO-S-4571 00 KAIG3-RFI-CO-S-4571-00
KAIG3-RFI-SG-LC-0222 00 KAIG3-RFI-SG-LC-0222-00
KAIG3-RFI-PA-C-0644 00 KAIG3-RFI-PA-C-0644-00
KAIG3-RFI-SW-C-0642 00 KAIG3-RFI-SW-C-0642-00
KAIG3-RFI-PA-C-0641 00 KAIG3-RFI-PA-C-0641-00
KAIG3-RFI-SG-LC-0221 00 KAIG3-RFI-SG-LC-0221-00
KAIG3-RFI-SG-E-0260 00 KAIG3-RFI-SG-E-0260-00
KAIG3-RFI-SG-E-0259 00 KAIG3-RFI-SG-E-0259-00
KAIG3-RFI-WG-C-0643 00 KAIG3-RFI-WG-C-0643-00
KAIG3-RFI-SG-SU-1669 00 KAIG3-RFI-SG-SU-1669-00
KAIG3-RFI-SG-S-4572 00 KAIG3-RFI-SG-S-4572-00
KAIG3-RFI-SG-S-4541 00 KAIG3-RFI-SG-S-4541-00
KAIG3-RFI-CO-S-4570 00 KAIG3-RFI-CO-S-4570-00
KAIG3-RFI-CO-S-4569 00 KAIG3-RFI-CO-S-4569-00
KAIG3-RFI-CO-S-4568 00 KAIG3-RFI-CO-S-4568-00
KAIG3-RFI-CO-S-4567 00 KAIG3-RFI-CO-S-4567-00
KAIG3-RFI-CO-S-4566 00 KAIG3-RFI-CO-S-4566-00
KAIG3-RFI-CO-SU-1668 00 KAIG3-RFI-CO-SU-1668-00
KAIG3-RFI-CO-SU-1667 00 KAIG3-RFI-CO-SU-1667-00
KAIG3-RFI-CO-SU-1665 00 KAIG3-RFI-CO-SU-1665-00
KAIG3-RFI-SW-C-0639 00 KAIG3-RFI-SW-C-0639-00
KAIG3-RFI-SW-C-0638 00 KAIG3-RFI-SW-C-0638-00
KAIG3-RFI-SW-C-0637 00 KAIG3-RFI-SW-C-0637-00
KAIG3-RFI-SW-C-0636 00 KAIG3-RFI-SW-C-0636-00
KAIG3-RFI-MB-LC-0218 01 KAIG3-RFI-MB-LC-0218-01
KAIG3-RFI-MB-LC-0211 01 KAIG3-RFI-MB-LC-0211-01
KAIG3-RFI-PG-C-0640 00 KAIG3-RFI-PG-C-0640-00
KAIG3-RFI-WG-S-4560 00 KAIG3-RFI-WG-S-4560-00
KAIG3-RFI-WG-S-4559 00 KAIG3-RFI-WG-S-4559-00
KAIG3-RFI-PA-C-0635 00 KAIG3-RFI-PA-C-0635-00
KAIG3-RFI-SW-C-0634 00 KAIG3-RFI-SW-C-0634-00
KAIG3-RFI-SW-C-0633 00 KAIG3-RFI-SW-C-0633-00
KAIG3-RFI-SW-C-0632 00 KAIG3-RFI-SW-C-0632-00
KAIG3-RFI-SW-C-0631 00 KAIG3-RFI-SW-C-0631-00
KAIG3-RFI-SW-C-0630 00 KAIG3-RFI-SW-C-0630-00
KAIG3-RFI-SW-C-0629 00 KAIG3-RFI-SW-C-0629-00
KAIG3-RFI-SW-C-0628 00 KAIG3-RFI-SW-C-0628-00
KAIG3-RFI-PA-C-0627 00 KAIG3-RFI-PA-C-0627-00
KAIG3-RFI-PA-C-0626 00 KAIG3-RFI-PA-C-0626-00
KAIG3-RFI-PA-C-0624 00 KAIG3-RFI-PA-C-0624-00
KAIG3-RFI-PA-C-0607 00 KAIG3-RFI-PA-C-0607-00
KAIG3-RFI-PA-C-0606 00 KAIG3-RFI-PA-C-0606-00
KAIG3-RFI-WG-A-0566 00 KAIG3-RFI-WG-A-0566-00
KAIG3-RFI-WG-A-0565 00 KAIG3-RFI-WG-A-0565-00
KAIG3-RFI-WG-A-0564 00 KAIG3-RFI-WG-A-0564-00
KAIG3-RFI-WG-A-0563 00 KAIG3-RFI-WG-A-0563-00
KAIG3-RFI-MB-A-0562 00 KAIG3-RFI-MB-A-0562-00
KAIG3-RFI-AG-SU-1666 00 KAIG3-RFI-AG-SU-1666-00
KAIG3-RFI-AG-P-0140 01 KAIG3-RFI-AG-P-0140-01
KAIG3-RFI-CO-C-0625 00 KAIG3-RFI-CO-C-0625-00
KAIG3-RFI-CO-S-4556 00 KAIG3-RFI-CO-S-4556-00
KAIG3-RFI-CO-S-4555 00 KAIG3-RFI-CO-S-4555-00
KAIG3-RFI-CO-S-4553 00 KAIG3-RFI-CO-S-4553-00
KAIG3-RFI-CO-S-4552 00 KAIG3-RFI-CO-S-4552-00
KAIG3-RFI-CO-S-4550 00 KAIG3-RFI-CO-S-4550-00
KAIG3-RFI-CO-S-4549 00 KAIG3-RFI-CO-S-4549-00
KAIG3-RFI-CO-S-4548 00 KAIG3-RFI-CO-S-4548-00
KAIG3-RFI-CO-S-4542 00 KAIG3-RFI-CO-S-4542-00
KAIG3-RFI-SW-LS-0255 02 KAIG3-RFI-SW-LS-0255-02
KAIG3-RFI-CO-S-4450 00 KAIG3-RFI-CO-S-4450-00
KAIG3-RFI-CO-S-4449 00 KAIG3-RFI-CO-S-4449-00
KAIG3-RFI-MB-A-0561 00 KAIG3-RFI-MB-A-0561-00
KAIG3-RFI-SG-S-4539 00 KAIG3-RFI-SG-S-4539-00
KAIG3-RFI-PA-C-0621 00 KAIG3-RFI-PA-C-0621-00
KAIG3-RFI-SW-C-0623 00 KAIG3-RFI-SW-C-0623-00
KAIG3-RFI-PA-C-0620 00 KAIG3-RFI-PA-C-0620-00
KAIG3-RFI-SW-C-0622 00 KAIG3-RFI-SW-C-0622-00
KAIG3-RFI-PA-C-0619 00 KAIG3-RFI-PA-C-0619-00
KAIG3-RFI-SW-C-0603 00 KAIG3-RFI-SW-C-0603-00
KAIG3-RFI-SW-C-0618 00 KAIG3-RFI-SW-C-0618-00
KAIG3-RFI-SW-C-0602 00 KAIG3-RFI-SW-C-0602-00
KAIG3-RFI-SW-C-0617 00 KAIG3-RFI-SW-C-0617-00
KAIG3-RFI-SW-C-0616 00 KAIG3-RFI-SW-C-0616-00
KAIG3-RFI-SW-C-0615 00 KAIG3-RFI-SW-C-0615-00
KAIG3-RFI-SW-C-0614 00 KAIG3-RFI-SW-C-0614-00
KAIG3-RFI-SW-C-0613 00 KAIG3-RFI-SW-C-0613-00
KAIG3-RFI-SW-C-0612 00 KAIG3-RFI-SW-C-0612-00
KAIG3-RFI-PA-C-0605 00 KAIG3-RFI-PA-C-0605-00
KAIG3-RFI-PA-C-0604 00 KAIG3-RFI-PA-C-0604-00
KAIG3-RFI-CO-SU-1664 00 KAIG3-RFI-CO-SU-1664-00
KAIG3-RFI-CO-SU-1663 00 KAIG3-RFI-CO-SU-1663-00
KAIG3-RFI-CO-SU-1662 00 KAIG3-RFI-CO-SU-1662-00
KAIG3-RFI-CO-S-4547 00 KAIG3-RFI-CO-S-4547-00
KAIG3-RFI-CO-S-4546 00 KAIG3-RFI-CO-S-4546-00
KAIG3-RFI-CO-S-4544 00 KAIG3-RFI-CO-S-4544-00
KAIG3-RFI-CO-S-4543 00 KAIG3-RFI-CO-S-4543-00
KAIG3-RFI-CO-S-4545 00 KAIG3-RFI-CO-S-4545-00
KAIG3-RFI-SG-LC-0220 00 KAIG3-RFI-SG-LC-0220-00
KAIG3-RFI-SG-LC-0219 00 KAIG3-RFI-SG-LC-0219-00
KAIG3-RFI-SG-LC-0214 03 KAIG3-RFI-SG-LC-0214-03
KAIG3-RFI-SG-LC-0213 03 KAIG3-RFI-SG-LC-0213-03
KAIG3-RFI-SG-LC-0212 03 KAIG3-RFI-SG-LC-0212-03
KAIG3-RFI-MB-S-4528 00 KAIG3-RFI-MB-S-4528-00
KAIG3-RFI-WG-S-4538 00 KAIG3-RFI-WG-S-4538-00
KAIG3-RFI-SG-S-4536 00 KAIG3-RFI-SG-S-4536-00
KAIG3-RFI-SG-S-4535 00 KAIG3-RFI-SG-S-4535-00
KAIG3-RFI-SG-S-4534 00 KAIG3-RFI-SG-S-4534-00
KAIG3-RFI-SG-S-4533 00 KAIG3-RFI-SG-S-4533-00
KAIG3-RFI-WG-S-4532 00 KAIG3-RFI-WG-S-4532-00
KAIG3-RFI-WG-S-4531 00 KAIG3-RFI-WG-S-4531-00
KAIG3-RFI-WG-S-4530 00 KAIG3-RFI-WG-S-4530-00
KAIG3-RFI-WG-S-4529 00 KAIG3-RFI-WG-S-4529-00
KAIG3-RFI-SW-C-0611 00 KAIG3-RFI-SW-C-0611-00
KAIG3-RFI-SW-C-0610 00 KAIG3-RFI-SW-C-0610-00
KAIG3-RFI-SW-C-0609 00 KAIG3-RFI-SW-C-0609-00
KAIG3-RFI-SW-C-0608 00 KAIG3-RFI-SW-C-0608-00
KAIG3-RFI-SW-C-0601 00 KAIG3-RFI-SW-C-0601-00
KAIG3-RFI-SW-C-0600 00 KAIG3-RFI-SW-C-0600-00
KAIG3-RFI-SW-C-0599 00 KAIG3-RFI-SW-C-0599-00
KAIG3-RFI-SW-C-0598 00 KAIG3-RFI-SW-C-0598-00
KAIG3-RFI-SW-C-0597 00 KAIG3-RFI-SW-C-0597-00
KAIG3-RFI-MB-S-4511 00 KAIG3-RFI-MB-S-4511-00
KAIG3-RFI-MB-A-0560 00 KAIG3-RFI-MB-A-0560-00
KAIG3-RFI-MB-A-0559 00 KAIG3-RFI-MB-A-0559-00
KAIG3-RFI-WG-C-0592 00 KAIG3-RFI-WG-C-0592-00
KAIG3-RFI-WG-C-0591 00 KAIG3-RFI-WG-C-0591-00
KAIG3-RFI-SW-C-0596 00 KAIG3-RFI-SW-C-0596-00
KAIG3-RFI-SW-C-0595 00 KAIG3-RFI-SW-C-0595-00
KAIG3-RFI-PA-C-0594 00 KAIG3-RFI-PA-C-0594-00
KAIG3-RFI-SW-C-0593 00 KAIG3-RFI-SW-C-0593-00
KAIG3-RFI-CO-S-4527 00 KAIG3-RFI-CO-S-4527-00
KAIG3-RFI-CO-S-4526 00 KAIG3-RFI-CO-S-4526-00
KAIG3-RFI-CO-S-4525 00 KAIG3-RFI-CO-S-4525-00
KAIG3-RFI-CO-S-4524 00 KAIG3-RFI-CO-S-4524-00
KAIG3-RFI-CO-S-4523 00 KAIG3-RFI-CO-S-4523-00
KAIG3-RFI-CO-SU-1661 00 KAIG3-RFI-CO-SU-1661-00
KAIG3-RFI-MC-SU-1660 00 KAIG3-RFI-MC-SU-1660-00
KAIG3-RFI-MC-SU-1659 00 KAIG3-RFI-MC-SU-1659-00
KAIG3-RFI-SG-E-0194 01 KAIG3-RFI-SG-E-0194-01
KAIG3-RFI-MB-S-4510 00 KAIG3-RFI-MB-S-4510-00
KAIG3-RFI-MB-S-4509 00 KAIG3-RFI-MB-S-4509-00
KAIG3-RFI-MB-A-0558 00 KAIG3-RFI-MB-A-0558-00
KAIG3-RFI-SG-SU-1658 00 KAIG3-RFI-SG-SU-1658-00
KAIG3-RFI-MC-S-4522 00 KAIG3-RFI-MC-S-4522-00
KAIG3-RFI-MC-S-4521 00 KAIG3-RFI-MC-S-4521-00
KAIG3-RFI-MC-S-4520 00 KAIG3-RFI-MC-S-4520-00
KAIG3-RFI-SG-S-4508 00 KAIG3-RFI-SG-S-4508-00
KAIG3-RFI-MC-S-4519 00 KAIG3-RFI-MC-S-4519-00
KAIG3-RFI-MC-S-4518 00 KAIG3-RFI-MC-S-4518-00
KAIG3-RFI-CO-S-4517 00 KAIG3-RFI-CO-S-4517-00
KAIG3-RFI-CO-S-4516 00 KAIG3-RFI-CO-S-4516-00
KAIG3-RFI-CO-S-4393 01 KAIG3-RFI-CO-S-4393-01
KAIG3-RFI-CO-S-4347 01 KAIG3-RFI-CO-S-4347-01
KAIG3-RFI-CO-S-4309 01 KAIG3-RFI-CO-S-4309-01
KAIG3-RFI-CO-S-4301 01 KAIG3-RFI-CO-S-4301-01
KAIG3-RFI-SG-E-0258 00 KAIG3-RFI-SG-E-0258-00
KAIG3-RFI-SG-E-0257 00 KAIG3-RFI-SG-E-0257-00
KAIG3-RFI-CO-S-4515 00 KAIG3-RFI-CO-S-4515-00
KAIG3-RFI-CO-S-4514 00 KAIG3-RFI-CO-S-4514-00
KAIG3-RFI-CO-S-4513 00 KAIG3-RFI-CO-S-4513-00
KAIG3-RFI-CO-S-4512 00 KAIG3-RFI-CO-S-4512-00
KAIG3-RFI-SW-C-0590 00 KAIG3-RFI-SW-C-0590-00
KAIG3-RFI-SW-C-0589 00 KAIG3-RFI-SW-C-0589-00
KAIG3-RFI-PA-C-0588 00 KAIG3-RFI-PA-C-0588-00
KAIG3-RFI-AG-P-0140 00 KAIG3-RFI-AG-P-0140-00
KAIG3-RFI-SW-C-0587 00 KAIG3-RFI-SW-C-0587-00
KAIG3-RFI-SW-C-0586 00 KAIG3-RFI-SW-C-0586-00
KAIG3-RFI-SW-C-0585 00 KAIG3-RFI-SW-C-0585-00
KAIG3-RFI-SW-C-0584 00 KAIG3-RFI-SW-C-0584-00
KAIG3-RFI-SW-C-0583 00 KAIG3-RFI-SW-C-0583-00
KAIG3-RFI-SW-C-0582 00 KAIG3-RFI-SW-C-0582-00
KAIG3-RFI-SW-C-0577 00 KAIG3-RFI-SW-C-0577-00
KAIG3-RFI-SG-S-4427 01 KAIG3-RFI-SG-S-4427-01
KAIG3-RFI-SG-S-4426 01 KAIG3-RFI-SG-S-4426-01
KAIG3-RFI-SG-S-4425 01 KAIG3-RFI-SG-S-4425-01
KAIG3-RFI-WG-S-4492 00 KAIG3-RFI-WG-S-4492-00
KAIG3-RFI-WG-S-4491 00 KAIG3-RFI-WG-S-4491-00
KAIG3-RFI-WG-S-4490 00 KAIG3-RFI-WG-S-4490-00
KAIG3-RFI-WG-S-4489 00 KAIG3-RFI-WG-S-4489-00
KAIG3-RFI-WG-S-4488 00 KAIG3-RFI-WG-S-4488-00
KAIG3-RFI-WG-S-4487 00 KAIG3-RFI-WG-S-4487-00
KAIG3-RFI-WG-S-4486 00 KAIG3-RFI-WG-S-4486-00
KAIG3-RFI-WG-S-4485 00 KAIG3-RFI-WG-S-4485-00
KAIG3-RFI-CO-SU-1657 00 KAIG3-RFI-CO-SU-1657-00
KAIG3-RFI-CO-SU-1656 00 KAIG3-RFI-CO-SU-1656-00
KAIG3-RFI-CO-S-4507 00 KAIG3-RFI-CO-S-4507-00
KAIG3-RFI-CO-S-4504 00 KAIG3-RFI-CO-S-4504-00
KAIG3-RFI-CO-S-4503 00 KAIG3-RFI-CO-S-4503-00
KAIG3-RFI-PC-E-0256 00 KAIG3-RFI-PC-E-0256-00
KAIG3-RFI-CO-S-4502 00 KAIG3-RFI-CO-S-4502-00
KAIG3-RFI-PC-E-0255 00 KAIG3-RFI-PC-E-0255-00
KAIG3-RFI-CO-S-4501 00 KAIG3-RFI-CO-S-4501-00
KAIG3-RFI-PC-E-0254 00 KAIG3-RFI-PC-E-0254-00
KAIG3-RFI-CO-S-4500 00 KAIG3-RFI-CO-S-4500-00
KAIG3-RFI-PC-E-0253 00 KAIG3-RFI-PC-E-0253-00
KAIG3-RFI-CO-S-4499 00 KAIG3-RFI-CO-S-4499-00
KAIG3-RFI-PC-E-0252 00 KAIG3-RFI-PC-E-0252-00
KAIG3-RFI-CO-S-4498 00 KAIG3-RFI-CO-S-4498-00
KAIG3-RFI-CO-S-4497 00 KAIG3-RFI-CO-S-4497-00
KAIG3-RFI-CO-S-4496 00 KAIG3-RFI-CO-S-4496-00
KAIG3-RFI-CO-S-4494 00 KAIG3-RFI-CO-S-4494-00
KAIG3-RFI-CO-S-4493 00 KAIG3-RFI-CO-S-4493-00
KAIG3-RFI-CO-S-4484 00 KAIG3-RFI-CO-S-4484-00
KAIG3-RFI-CO-S-4483 00 KAIG3-RFI-CO-S-4483-00
KAIG3-RFI-CO-S-4482 00 KAIG3-RFI-CO-S-4482-00
KAIG3-RFI-CO-S-4390 01 KAIG3-RFI-CO-S-4390-01
KAIG3-RFI-CO-S-4407 01 KAIG3-RFI-CO-S-4407-01
KAIG3-RFI-SW-C-0581 00 KAIG3-RFI-SW-C-0581-00
KAIG3-RFI-PA-C-0580 00 KAIG3-RFI-PA-C-0580-00
KAIG3-RFI-PA-C-0579 00 KAIG3-RFI-PA-C-0579-00
KAIG3-RFI-PA-C-0578 00 KAIG3-RFI-PA-C-0578-00
KAIG3-RFI-PA-C-0568 00 KAIG3-RFI-PA-C-0568-00
KAIG3-RFI-SW-C-0554 01 KAIG3-RFI-SW-C-0554-01
KAIG3-RFI-PA-C-0519 01 KAIG3-RFI-PA-C-0519-01
KAIG3-RFI-CO-S-4313 01 KAIG3-RFI-CO-S-4313-01
KAIG3-RFI-CO-S-4365 00 KAIG3-RFI-CO-S-4365-00
KAIG3-RFI-CO-S-4316 01 KAIG3-RFI-CO-S-4316-01
KAIG3-RFI-CO-S-4432 00 KAIG3-RFI-CO-S-4432-00
KAIG3-RFI-PC-E-0251 00 KAIG3-RFI-PC-E-0251-00
KAIG3-RFI-PC-E-0250 00 KAIG3-RFI-PC-E-0250-00
KAIG3-RFI-MB-A-0557 00 KAIG3-RFI-MB-A-0557-00
KAIG3-RFI-MB-A-0556 00 KAIG3-RFI-MB-A-0556-00
KAIG3-RFI-MB-A-0555 00 KAIG3-RFI-MB-A-0555-00
KAIG3-RFI-CO-S-4481 00 KAIG3-RFI-CO-S-4481-00
KAIG3-RFI-CO-S-4480 00 KAIG3-RFI-CO-S-4480-00
KAIG3-RFI-CO-S-4479 00 KAIG3-RFI-CO-S-4479-00
KAIG3-RFI-CO-S-4478 00 KAIG3-RFI-CO-S-4478-00
KAIG3-RFI-CO-SU-1655 00 KAIG3-RFI-CO-SU-1655-00
KAIG3-RFI-CO-SU-1654 00 KAIG3-RFI-CO-SU-1654-00
KAIG3-RFI-CO-S-4477 00 KAIG3-RFI-CO-S-4477-00
KAIG3-RFI-CO-S-4476 00 KAIG3-RFI-CO-S-4476-00
KAIG3-RFI-CO-S-4475 00 KAIG3-RFI-CO-S-4475-00
KAIG3-RFI-SW-C-0574 00 KAIG3-RFI-SW-C-0574-00
KAIG3-RFI-SW-C-0573 00 KAIG3-RFI-SW-C-0573-00
KAIG3-RFI-SW-C-0572 00 KAIG3-RFI-SW-C-0572-00
KAIG3-RFI-CO-SU-1653 00 KAIG3-RFI-CO-SU-1653-00
KAIG3-RFI-SW-C-0571 00 KAIG3-RFI-SW-C-0571-00
KAIG3-RFI-CO-SU-1652 00 KAIG3-RFI-CO-SU-1652-00
KAIG3-RFI-SW-LS-0256 02 KAIG3-RFI-SW-LS-0256-02
KAIG3-RFI-SW-LS-0238 02 KAIG3-RFI-SW-LS-0238-02
KAIG3-RFI-SW-LS-0217 02 KAIG3-RFI-SW-LS-0217-02
KAIG3-RFI-SW-LS-0216 02 KAIG3-RFI-SW-LS-0216-02
KAIG3-RFI-SW-LS-0212 01 KAIG3-RFI-SW-LS-0212-01
KAIG3-RFI-SW-LS-0207 01 KAIG3-RFI-SW-LS-0207-01
KAIG3-RFI-SW-LS-0201 01 KAIG3-RFI-SW-LS-0201-01
KAIG3-RFI-SW-LS-0200 01 KAIG3-RFI-SW-LS-0200-01
KAIG3-RFI-PA-C-0576 00 KAIG3-RFI-PA-C-0576-00
KAIG3-RFI-PA-C-0575 00 KAIG3-RFI-PA-C-0575-00
KAIG3-RFI-PA-C-0570 00 KAIG3-RFI-PA-C-0570-00
KAIG3-RFI-PA-C-0569 00 KAIG3-RFI-PA-C-0569-00
KAIG3-RFI-PA-C-0567 00 KAIG3-RFI-PA-C-0567-00
KAIG3-RFI-CO-S-4353 00 KAIG3-RFI-CO-S-4353-00
KAIG3-RFI-MB-A-0554 00 KAIG3-RFI-MB-A-0554-00
KAIG3-RFI-WG-C-0558 00 KAIG3-RFI-WG-C-0558-00
KAIG3-RFI-SG-SU-1651 00 KAIG3-RFI-SG-SU-1651-00
KAIG3-RFI-SG-S-4463 00 KAIG3-RFI-SG-S-4463-00
KAIG3-RFI-WG-LS-0496 00 KAIG3-RFI-WG-LS-0496-00
KAIG3-RFI-CO-S-4474 00 KAIG3-RFI-CO-S-4474-00
KAIG3-RFI-CO-S-4473 00 KAIG3-RFI-CO-S-4473-00
KAIG3-RFI-CO-S-4472 00 KAIG3-RFI-CO-S-4472-00
KAIG3-RFI-CO-S-4471 00 KAIG3-RFI-CO-S-4471-00
KAIG3-RFI-SW-C-0566 00 KAIG3-RFI-SW-C-0566-00
KAIG3-RFI-SW-C-0565 00 KAIG3-RFI-SW-C-0565-00
KAIG3-RFI-PA-C-0563 00 KAIG3-RFI-PA-C-0563-00
KAIG3-RFI-PA-C-0562 00 KAIG3-RFI-PA-C-0562-00
KAIG3-RFI-CO-S-4470 00 KAIG3-RFI-CO-S-4470-00
KAIG3-RFI-PA-C-0561 00 KAIG3-RFI-PA-C-0561-00
KAIG3-RFI-PA-C-0560 00 KAIG3-RFI-PA-C-0560-00
KAIG3-RFI-PA-C-0559 00 KAIG3-RFI-PA-C-0559-00
KAIG3-RFI-CO-S-4469 00 KAIG3-RFI-CO-S-4469-00
KAIG3-RFI-CO-S-4468 00 KAIG3-RFI-CO-S-4468-00
KAIG3-RFI-CO-S-4467 00 KAIG3-RFI-CO-S-4467-00
KAIG3-RFI-CO-S-4466 00 KAIG3-RFI-CO-S-4466-00
KAIG3-RFI-CO-S-4465 00 KAIG3-RFI-CO-S-4465-00
KAIG3-RFI-CO-S-4464 00 KAIG3-RFI-CO-S-4464-00
KAIG3-RFI-CO-SU-1650 00 KAIG3-RFI-CO-SU-1650-00
KAIG3-RFI-CO-C-0564 00 KAIG3-RFI-CO-C-0564-00
KAIG3-RFI-CO-S-4462 00 KAIG3-RFI-CO-S-4462-00
KAIG3-RFI-CO-S-4461 00 KAIG3-RFI-CO-S-4461-00
KAIG3-RFI-CO-S-4394 01 KAIG3-RFI-CO-S-4394-01
KAIG3-RFI-CO-S-4399 01 KAIG3-RFI-CO-S-4399-01
KAIG3-RFI-CO-S-4398 01 KAIG3-RFI-CO-S-4398-01
KAIG3-RFI-CO-S-4397 01 KAIG3-RFI-CO-S-4397-01
KAIG3-RFI-CO-S-4396 01 KAIG3-RFI-CO-S-4396-01
KAIG3-RFI-CO-S-4460 00 KAIG3-RFI-CO-S-4460-00
KAIG3-RFI-PC-E-0249 00 KAIG3-RFI-PC-E-0249-00
KAIG3-RFI-PC-E-0248 00 KAIG3-RFI-PC-E-0248-00
KAIG3-RFI-PC-E-0247 00 KAIG3-RFI-PC-E-0247-00
KAIG3-RFI-PC-E-0246 00 KAIG3-RFI-PC-E-0246-00
KAIG3-RFI-SW-A-0553 00 KAIG3-RFI-SW-A-0553-00
KAIG3-RFI-SW-A-0551 00 KAIG3-RFI-SW-A-0551-00
KAIG3-RFI-SW-A-0550 00 KAIG3-RFI-SW-A-0550-00
KAIG3-RFI-SW-A-0549 00 KAIG3-RFI-SW-A-0549-00
KAIG3-RFI-SW-A-0548 00 KAIG3-RFI-SW-A-0548-00
KAIG3-RFI-SW-A-0547 00 KAIG3-RFI-SW-A-0547-00
KAIG3-RFI-SW-A-0528 01 KAIG3-RFI-SW-A-0528-01
KAIG3-RFI-SW-A-0546 00 KAIG3-RFI-SW-A-0546-00
KAIG3-RFI-WG-LS-0499 00 KAIG3-RFI-WG-LS-0499-00
KAIG3-RFI-WG-LS-0498 00 KAIG3-RFI-WG-LS-0498-00
KAIG3-RFI-WG-LS-0497 00 KAIG3-RFI-WG-LS-0497-00
KAIG3-RFI-WG-LS-0495 00 KAIG3-RFI-WG-LS-0495-00
KAIG3-RFI-MB-A-0552 00 KAIG3-RFI-MB-A-0552-00
KAIG3-RFI-MB-A-0543 01 KAIG3-RFI-MB-A-0543-01
KAIG3-RFI-MB-A-0542 01 KAIG3-RFI-MB-A-0542-01
KAIG3-RFI-SG-S-4403 01 KAIG3-RFI-SG-S-4403-01
KAIG3-RFI-SG-S-4402 01 KAIG3-RFI-SG-S-4402-01
KAIG3-RFI-CO-SU-1649 00 KAIG3-RFI-CO-SU-1649-00
KAIG3-RFI-CO-SU-1648 00 KAIG3-RFI-CO-SU-1648-00
KAIG3-RFI-CO-SU-1647 00 KAIG3-RFI-CO-SU-1647-00
KAIG3-RFI-CO-S-4459 00 KAIG3-RFI-CO-S-4459-00
KAIG3-RFI-CO-S-4458 00 KAIG3-RFI-CO-S-4458-00
KAIG3-RFI-CO-S-4457 00 KAIG3-RFI-CO-S-4457-00
KAIG3-RFI-CO-S-4456 00 KAIG3-RFI-CO-S-4456-00
KAIG3-RFI-CO-S-4455 00 KAIG3-RFI-CO-S-4455-00
KAIG3-RFI-CO-S-4454 00 KAIG3-RFI-CO-S-4454-00
KAIG3-RFI-CO-S-4452 00 KAIG3-RFI-CO-S-4452-00
KAIG3-RFI-CO-S-4453 00 KAIG3-RFI-CO-S-4453-00
KAIG3-RFI-CO-S-4352 00 KAIG3-RFI-CO-S-4352-00
KAIG3-RFI-CO-S-4400 00 KAIG3-RFI-CO-S-4400-00
KAIG3-RFI-PA-C-0557 00 KAIG3-RFI-PA-C-0557-00
KAIG3-RFI-SW-C-0556 00 KAIG3-RFI-SW-C-0556-00
KAIG3-RFI-SW-C-0555 00 KAIG3-RFI-SW-C-0555-00
KAIG3-RFI-SW-C-0554 00 KAIG3-RFI-SW-C-0554-00
KAIG3-RFI-SW-C-0547 00 KAIG3-RFI-SW-C-0547-00
KAIG3-RFI-CO-SU-1646 00 KAIG3-RFI-CO-SU-1646-00
KAIG3-RFI-CO-SU-1645 00 KAIG3-RFI-CO-SU-1645-00
KAIG3-RFI-CO-SU-1630 00 KAIG3-RFI-CO-SU-1630-00
KAIG3-RFI-CO-S-4451 00 KAIG3-RFI-CO-S-4451-00
KAIG3-RFI-CO-S-4448 00 KAIG3-RFI-CO-S-4448-00
KAIG3-RFI-CO-S-4447 00 KAIG3-RFI-CO-S-4447-00
KAIG3-RFI-CO-S-4446 00 KAIG3-RFI-CO-S-4446-00
KAIG3-RFI-SW-C-0551 00 KAIG3-RFI-SW-C-0551-00
KAIG3-RFI-SW-C-0550 00 KAIG3-RFI-SW-C-0550-00
KAIG3-RFI-SW-C-0548 00 KAIG3-RFI-SW-C-0548-00
KAIG3-RFI-SW-C-0546 00 KAIG3-RFI-SW-C-0546-00
KAIG3-RFI-PA-C-0545 00 KAIG3-RFI-PA-C-0545-00
KAIG3-RFI-PA-C-0544 00 KAIG3-RFI-PA-C-0544-00
KAIG3-RFI-SW-C-0543 00 KAIG3-RFI-SW-C-0543-00
KAIG3-RFI-SW-C-0542 00 KAIG3-RFI-SW-C-0542-00
KAIG3-RFI-SW-C-0553 00 KAIG3-RFI-SW-C-0553-00
KAIG3-RFI-SW-C-0552 00 KAIG3-RFI-SW-C-0552-00
KAIG3-RFI-SW-C-0538 00 KAIG3-RFI-SW-C-0538-00
KAIG3-RFI-SW-C-0537 00 KAIG3-RFI-SW-C-0537-00
KAIG3-RFI-WG-A-0545 00 KAIG3-RFI-WG-A-0545-00
KAIG3-RFI-ZG-C-0549 00 KAIG3-RFI-ZG-C-0549-00
KAIG3-RFI-WG-S-4441 00 KAIG3-RFI-WG-S-4441-00
KAIG3-RFI-CO-SU-1644 00 KAIG3-RFI-CO-SU-1644-00
KAIG3-RFI-CO-SU-1643 00 KAIG3-RFI-CO-SU-1643-00
KAIG3-RFI-CO-S-4445 00 KAIG3-RFI-CO-S-4445-00
KAIG3-RFI-CO-S-4444 00 KAIG3-RFI-CO-S-4444-00
KAIG3-RFI-CO-S-4443 00 KAIG3-RFI-CO-S-4443-00
KAIG3-RFI-CO-S-4442 00 KAIG3-RFI-CO-S-4442-00
KAIG3-RFI-CO-C-0533 00 KAIG3-RFI-CO-C-0533-00
KAIG3-RFI-CO-SU-1642 00 KAIG3-RFI-CO-SU-1642-00
KAIG3-RFI-CO-S-4440 00 KAIG3-RFI-CO-S-4440-00
KAIG3-RFI-CO-S-4439 00 KAIG3-RFI-CO-S-4439-00
KAIG3-RFI-CO-SU-1641 00 KAIG3-RFI-CO-SU-1641-00
KAIG3-RFI-PA-LS-0494 00 KAIG3-RFI-PA-LS-0494-00
KAIG3-RFI-CO-S-4438 00 KAIG3-RFI-CO-S-4438-00
KAIG3-RFI-SW-C-0541 00 KAIG3-RFI-SW-C-0541-00
KAIG3-RFI-CO-S-4437 00 KAIG3-RFI-CO-S-4437-00
KAIG3-RFI-SW-C-0540 00 KAIG3-RFI-SW-C-0540-00
KAIG3-RFI-CO-SU-1640 00 KAIG3-RFI-CO-SU-1640-00
KAIG3-RFI-CO-S-4436 00 KAIG3-RFI-CO-S-4436-00
KAIG3-RFI-CO-S-4435 00 KAIG3-RFI-CO-S-4435-00
KAIG3-RFI-PA-C-0539 00 KAIG3-RFI-PA-C-0539-00
KAIG3-RFI-SW-C-0536 00 KAIG3-RFI-SW-C-0536-00
KAIG3-RFI-CO-S-4434 00 KAIG3-RFI-CO-S-4434-00
KAIG3-RFI-SW-C-0535 00 KAIG3-RFI-SW-C-0535-00
KAIG3-RFI-CO-S-4433 00 KAIG3-RFI-CO-S-4433-00
KAIG3-RFI-PA-C-0534 00 KAIG3-RFI-PA-C-0534-00
KAIG3-RFI-SG-LC-0214 02 KAIG3-RFI-SG-LC-0214-02
KAIG3-RFI-SG-LC-0213 02 KAIG3-RFI-SG-LC-0213-02
KAIG3-RFI-SG-LC-0212 02 KAIG3-RFI-SG-LC-0212-02
KAIG3-RFI-CO-S-4212 01 KAIG3-RFI-CO-S-4212-01
KAIG3-RFI-WG-A-0544 00 KAIG3-RFI-WG-A-0544-00
KAIG3-RFI-MB-A-0543 00 KAIG3-RFI-MB-A-0543-00
KAIG3-RFI-MB-A-0542 00 KAIG3-RFI-MB-A-0542-00
KAIG3-RFI-AG-C-0528 00 KAIG3-RFI-AG-C-0528-00
KAIG3-RFI-ZG-S-4294 01 KAIG3-RFI-ZG-S-4294-01
KAIG3-RFI-SG-S-4429 00 KAIG3-RFI-SG-S-4429-00
KAIG3-RFI-SG-S-4428 00 KAIG3-RFI-SG-S-4428-00
KAIG3-RFI-SG-S-4427 00 KAIG3-RFI-SG-S-4427-00
KAIG3-RFI-SG-S-4426 00 KAIG3-RFI-SG-S-4426-00
KAIG3-RFI-SG-S-4425 00 KAIG3-RFI-SG-S-4425-00
KAIG3-RFI-WG-S-4424 00 KAIG3-RFI-WG-S-4424-00
KAIG3-RFI-WG-S-4423 00 KAIG3-RFI-WG-S-4423-00
KAIG3-RFI-WG-S-4422 00 KAIG3-RFI-WG-S-4422-00
KAIG3-RFI-WG-S-4421 00 KAIG3-RFI-WG-S-4421-00
KAIG3-RFI-WG-S-4420 00 KAIG3-RFI-WG-S-4420-00
KAIG3-RFI-WG-S-4419 00 KAIG3-RFI-WG-S-4419-00
KAIG3-RFI-WG-S-4418 00 KAIG3-RFI-WG-S-4418-00
KAIG3-RFI-WG-S-4417 00 KAIG3-RFI-WG-S-4417-00
KAIG3-RFI-WG-S-4416 00 KAIG3-RFI-WG-S-4416-00
KAIG3-RFI-WG-S-4415 00 KAIG3-RFI-WG-S-4415-00
KAIG3-RFI-WG-S-4414 00 KAIG3-RFI-WG-S-4414-00
KAIG3-RFI-WG-S-4413 00 KAIG3-RFI-WG-S-4413-00
KAIG3-RFI-WG-S-4412 00 KAIG3-RFI-WG-S-4412-00
KAIG3-RFI-WG-S-4411 00 KAIG3-RFI-WG-S-4411-00
KAIG3-RFI-WG-S-4410 00 KAIG3-RFI-WG-S-4410-00
KAIG3-RFI-WG-S-4409 00 KAIG3-RFI-WG-S-4409-00
KAIG3-RFI-SG-A-0541 00 KAIG3-RFI-SG-A-0541-00
KAIG3-RFI-MB-LC-0218 00 KAIG3-RFI-MB-LC-0218-00
KAIG3-RFI-MB-LC-0217 00 KAIG3-RFI-MB-LC-0217-00
KAIG3-RFI-MB-LC-0216 00 KAIG3-RFI-MB-LC-0216-00
KAIG3-RFI-PA-C-0532 00 KAIG3-RFI-PA-C-0532-00
KAIG3-RFI-PA-C-0531 00 KAIG3-RFI-PA-C-0531-00
KAIG3-RFI-SW-C-0530 00 KAIG3-RFI-SW-C-0530-00
KAIG3-RFI-SW-C-0529 00 KAIG3-RFI-SW-C-0529-00
KAIG3-RFI-CO-E-0245 00 KAIG3-RFI-CO-E-0245-00
KAIG3-RFI-PA-C-0527 00 KAIG3-RFI-PA-C-0527-00
KAIG3-RFI-CO-E-0244 00 KAIG3-RFI-CO-E-0244-00
KAIG3-RFI-PA-C-0526 00 KAIG3-RFI-PA-C-0526-00
KAIG3-RFI-CO-E-0243 00 KAIG3-RFI-CO-E-0243-00
KAIG3-RFI-CO-E-0242 00 KAIG3-RFI-CO-E-0242-00
KAIG3-RFI-MB-E-0241 00 KAIG3-RFI-MB-E-0241-00
KAIG3-RFI-CO-S-4319 01 KAIG3-RFI-CO-S-4319-01
KAIG3-RFI-CO-SU-1639 00 KAIG3-RFI-CO-SU-1639-00
KAIG3-RFI-CO-S-4431 00 KAIG3-RFI-CO-S-4431-00
KAIG3-RFI-CO-S-4430 00 KAIG3-RFI-CO-S-4430-00
KAIG3-RFI-CO-SU-1638 00 KAIG3-RFI-CO-SU-1638-00
KAIG3-RFI-CO-S-4408 00 KAIG3-RFI-CO-S-4408-00
KAIG3-RFI-CO-S-4407 00 KAIG3-RFI-CO-S-4407-00
KAIG3-RFI-CO-S-4406 00 KAIG3-RFI-CO-S-4406-00
KAIG3-RFI-CO-S-4405 00 KAIG3-RFI-CO-S-4405-00
KAIG3-RFI-CO-S-4404 00 KAIG3-RFI-CO-S-4404-00
KAIG3-RFI-CO-S-4399 00 KAIG3-RFI-CO-S-4399-00
KAIG3-RFI-CO-S-4398 00 KAIG3-RFI-CO-S-4398-00
KAIG3-RFI-CO-S-4397 00 KAIG3-RFI-CO-S-4397-00
KAIG3-RFI-CO-S-4396 00 KAIG3-RFI-CO-S-4396-00
KAIG3-RFI-CO-S-4183 02 KAIG3-RFI-CO-S-4183-02
KAIG3-RFI-SG-S-4403 00 KAIG3-RFI-SG-S-4403-00
KAIG3-RFI-SG-S-4402 00 KAIG3-RFI-SG-S-4402-00
KAIG3-RFI-SG-S-4401 00 KAIG3-RFI-SG-S-4401-00
KAIG3-RFI-SG-A-0540 00 KAIG3-RFI-SG-A-0540-00
KAIG3-RFI-CO-S-4255 01 KAIG3-RFI-CO-S-4255-01
KAIG3-RFI-CO-S-4256 01 KAIG3-RFI-CO-S-4256-01
KAIG3-RFI-CO-S-4292 01 KAIG3-RFI-CO-S-4292-01
KAIG3-RFI-CO-S-4296 01 KAIG3-RFI-CO-S-4296-01
KAIG3-RFI-CO-S-4394 00 KAIG3-RFI-CO-S-4394-00
KAIG3-RFI-CO-S-4393 00 KAIG3-RFI-CO-S-4393-00
KAIG3-RFI-PA-C-0525 00 KAIG3-RFI-PA-C-0525-00
KAIG3-RFI-PA-C-0524 00 KAIG3-RFI-PA-C-0524-00
KAIG3-RFI-SW-C-0523 00 KAIG3-RFI-SW-C-0523-00
KAIG3-RFI-SW-C-0522 00 KAIG3-RFI-SW-C-0522-00
KAIG3-RFI-PA-C-0521 00 KAIG3-RFI-PA-C-0521-00
KAIG3-RFI-PA-C-0520 00 KAIG3-RFI-PA-C-0520-00
KAIG3-RFI-PA-C-0519 00 KAIG3-RFI-PA-C-0519-00
KAIG3-RFI-SW-C-0518 00 KAIG3-RFI-SW-C-0518-00
KAIG3-RFI-SW-C-0517 00 KAIG3-RFI-SW-C-0517-00
KAIG3-RFI-PA-C-0516 00 KAIG3-RFI-PA-C-0516-00
KAIG3-RFI-PA-C-0515 00 KAIG3-RFI-PA-C-0515-00
KAIG3-RFI-PA-C-0514 00 KAIG3-RFI-PA-C-0514-00
KAIG3-RFI-SG-E-0240 00 KAIG3-RFI-SG-E-0240-00
KAIG3-RFI-SG-LC-0215 00 KAIG3-RFI-SG-LC-0215-00
KAIG3-RFI-SG-LC-0195 01 KAIG3-RFI-SG-LC-0195-01
KAIG3-RFI-CO-S-4392 00 KAIG3-RFI-CO-S-4392-00
KAIG3-RFI-CO-S-4250 01 KAIG3-RFI-CO-S-4250-01
KAIG3-RFI-MB-P-0140 00 KAIG3-RFI-MB-P-0140-00
KAIG3-RFI-SG-S-4391 00 KAIG3-RFI-SG-S-4391-00
KAIG3-RFI-SG-S-4388 00 KAIG3-RFI-SG-S-4388-00
KAIG3-RFI-SG-S-4387 00 KAIG3-RFI-SG-S-4387-00
KAIG3-RFI-AG-C-0512 00 KAIG3-RFI-AG-C-0512-00
KAIG3-RFI-AG-C-0511 00 KAIG3-RFI-AG-C-0511-00
KAIG3-RFI-SG-S-4386 00 KAIG3-RFI-SG-S-4386-00
KAIG3-RFI-MB-A-0539 00 KAIG3-RFI-MB-A-0539-00
KAIG3-RFI-MB-A-0538 00 KAIG3-RFI-MB-A-0538-00
KAIG3-RFI-WG-C-0506 00 KAIG3-RFI-WG-C-0506-00
KAIG3-RFI-WG-C-0505 00 KAIG3-RFI-WG-C-0505-00
KAIG3-RFI-SG-A-0537 00 KAIG3-RFI-SG-A-0537-00
KAIG3-RFI-SG-A-0536 00 KAIG3-RFI-SG-A-0536-00
KAIG3-RFI-SW-C-0510 00 KAIG3-RFI-SW-C-0510-00
KAIG3-RFI-SW-C-0509 00 KAIG3-RFI-SW-C-0509-00
KAIG3-RFI-SW-C-0508 00 KAIG3-RFI-SW-C-0508-00
KAIG3-RFI-PA-C-0454 01 KAIG3-RFI-PA-C-0454-01
KAIG3-RFI-SW-C-0513 00 KAIG3-RFI-SW-C-0513-00
KAIG3-RFI-SW-C-0504 00 KAIG3-RFI-SW-C-0504-00
KAIG3-RFI-SW-C-0503 00 KAIG3-RFI-SW-C-0503-00
KAIG3-RFI-CO-E-0239 00 KAIG3-RFI-CO-E-0239-00
KAIG3-RFI-CO-E-0238 00 KAIG3-RFI-CO-E-0238-00
KAIG3-RFI-CO-SU-1637 00 KAIG3-RFI-CO-SU-1637-00
KAIG3-RFI-CO-S-2785 01 KAIG3-RFI-CO-S-2785-01
KAIG3-RFI-CO-S-2784 01 KAIG3-RFI-CO-S-2784-01
KAIG3-RFI-CO-S-4390 00 KAIG3-RFI-CO-S-4390-00
KAIG3-RFI-CO-S-4389 00 KAIG3-RFI-CO-S-4389-00
KAIG3-RFI-WG-LS-0493 00 KAIG3-RFI-WG-LS-0493-00
KAIG3-RFI-SG-S-4384 00 KAIG3-RFI-SG-S-4384-00
KAIG3-RFI-SG-S-4383 00 KAIG3-RFI-SG-S-4383-00
KAIG3-RFI-SG-S-4382 00 KAIG3-RFI-SG-S-4382-00
KAIG3-RFI-SG-S-4381 00 KAIG3-RFI-SG-S-4381-00
KAIG3-RFI-SG-S-4380 00 KAIG3-RFI-SG-S-4380-00
KAIG3-RFI-SG-S-4379 00 KAIG3-RFI-SG-S-4379-00
KAIG3-RFI-SG-S-4378 00 KAIG3-RFI-SG-S-4378-00
KAIG3-RFI-SG-S-4377 00 KAIG3-RFI-SG-S-4377-00
KAIG3-RFI-SG-S-4376 00 KAIG3-RFI-SG-S-4376-00
KAIG3-RFI-SG-S-4375 00 KAIG3-RFI-SG-S-4375-00
KAIG3-RFI-MB-A-0535 00 KAIG3-RFI-MB-A-0535-00
KAIG3-RFI-SG-S-4366 00 KAIG3-RFI-SG-S-4366-00
KAIG3-RFI-SG-SU-1635 00 KAIG3-RFI-SG-SU-1635-00
KAIG3-RFI-SG-C-0424 01 KAIG3-RFI-SG-C-0424-01
KAIG3-RFI-MB-A-0534 00 KAIG3-RFI-MB-A-0534-00
KAIG3-RFI-WG-LS-0492 00 KAIG3-RFI-WG-LS-0492-00
KAIG3-RFI-WG-LS-0491 00 KAIG3-RFI-WG-LS-0491-00
KAIG3-RFI-CO-SU-1636 00 KAIG3-RFI-CO-SU-1636-00
KAIG3-RFI-MC-S-4385 00 KAIG3-RFI-MC-S-4385-00
KAIG3-RFI-CO-S-4374 00 KAIG3-RFI-CO-S-4374-00
KAIG3-RFI-CO-S-4373 00 KAIG3-RFI-CO-S-4373-00
KAIG3-RFI-CO-S-4372 00 KAIG3-RFI-CO-S-4372-00
KAIG3-RFI-CO-S-4371 00 KAIG3-RFI-CO-S-4371-00
KAIG3-RFI-CO-S-4370 00 KAIG3-RFI-CO-S-4370-00
KAIG3-RFI-CO-S-4369 00 KAIG3-RFI-CO-S-4369-00
KAIG3-RFI-SW-C-0499 00 KAIG3-RFI-SW-C-0499-00
KAIG3-RFI-CO-S-4368 00 KAIG3-RFI-CO-S-4368-00
KAIG3-RFI-SW-C-0498 00 KAIG3-RFI-SW-C-0498-00
KAIG3-RFI-CO-S-4367 00 KAIG3-RFI-CO-S-4367-00
KAIG3-RFI-SW-C-0497 00 KAIG3-RFI-SW-C-0497-00
KAIG3-RFI-CO-C-0496 00 KAIG3-RFI-CO-C-0496-00
KAIG3-RFI-PA-C-0502 00 KAIG3-RFI-PA-C-0502-00
KAIG3-RFI-PA-C-0501 00 KAIG3-RFI-PA-C-0501-00
KAIG3-RFI-PA-C-0500 00 KAIG3-RFI-PA-C-0500-00
KAIG3-RFI-SW-C-0484 00 KAIG3-RFI-SW-C-0484-00
KAIG3-RFI-SW-C-0483 00 KAIG3-RFI-SW-C-0483-00
KAIG3-RFI-SW-C-0482 00 KAIG3-RFI-SW-C-0482-00
KAIG3-RFI-SW-C-0481 00 KAIG3-RFI-SW-C-0481-00
KAIG3-RFI-SW-C-0480 00 KAIG3-RFI-SW-C-0480-00
KAIG3-RFI-SW-C-0479 00 KAIG3-RFI-SW-C-0479-00
KAIG3-RFI-SW-C-0440 01 KAIG3-RFI-SW-C-0440-01
KAIG3-RFI-SG-LC-0214 01 KAIG3-RFI-SG-LC-0214-01
KAIG3-RFI-SG-LC-0213 01 KAIG3-RFI-SG-LC-0213-01
KAIG3-RFI-SG-LC-0212 01 KAIG3-RFI-SG-LC-0212-01
KAIG3-RFI-SW-C-0478 00 KAIG3-RFI-SW-C-0478-00
KAIG3-RFI-PA-C-0477 00 KAIG3-RFI-PA-C-0477-00
KAIG3-RFI-SW-C-0474 00 KAIG3-RFI-SW-C-0474-00
KAIG3-RFI-SW-C-0473 00 KAIG3-RFI-SW-C-0473-00
KAIG3-RFI-SW-C-0472 00 KAIG3-RFI-SW-C-0472-00
KAIG3-RFI-SW-C-0471 00 KAIG3-RFI-SW-C-0471-00
KAIG3-RFI-SW-C-0470 00 KAIG3-RFI-SW-C-0470-00
KAIG3-RFI-SW-C-0403 01 KAIG3-RFI-SW-C-0403-01
KAIG3-RFI-CO-SU-1631 00 KAIG3-RFI-CO-SU-1631-00
KAIG3-RFI-CO-SU-1632 00 KAIG3-RFI-CO-SU-1632-00
KAIG3-RFI-CO-SU-1634 00 KAIG3-RFI-CO-SU-1634-00
KAIG3-RFI-CO-SU-1633 00 KAIG3-RFI-CO-SU-1633-00
KAIG3-RFI-CO-S-4364 00 KAIG3-RFI-CO-S-4364-00
KAIG3-RFI-CO-S-4363 00 KAIG3-RFI-CO-S-4363-00
KAIG3-RFI-CO-S-4362 00 KAIG3-RFI-CO-S-4362-00
KAIG3-RFI-MC-S-4361 00 KAIG3-RFI-MC-S-4361-00
KAIG3-RFI-MC-S-4360 00 KAIG3-RFI-MC-S-4360-00
KAIG3-RFI-MC-S-4359 00 KAIG3-RFI-MC-S-4359-00
KAIG3-RFI-CO-S-4358 00 KAIG3-RFI-CO-S-4358-00
KAIG3-RFI-MC-S-4357 00 KAIG3-RFI-MC-S-4357-00
KAIG3-RFI-MC-S-4356 00 KAIG3-RFI-MC-S-4356-00
KAIG3-RFI-MC-S-4355 00 KAIG3-RFI-MC-S-4355-00
KAIG3-RFI-CO-S-4351 00 KAIG3-RFI-CO-S-4351-00
KAIG3-RFI-CO-S-4350 00 KAIG3-RFI-CO-S-4350-00
KAIG3-RFI-CO-S-4349 00 KAIG3-RFI-CO-S-4349-00
KAIG3-RFI-CO-S-4348 00 KAIG3-RFI-CO-S-4348-00
KAIG3-RFI-CO-S-4347 00 KAIG3-RFI-CO-S-4347-00
KAIG3-RFI-MC-S-4346 00 KAIG3-RFI-MC-S-4346-00
KAIG3-RFI-MC-S-4345 00 KAIG3-RFI-MC-S-4345-00
KAIG3-RFI-MC-S-4344 00 KAIG3-RFI-MC-S-4344-00
KAIG3-RFI-MC-S-4008 02 KAIG3-RFI-MC-S-4008-02
KAIG3-RFI-AG-C-0476 00 KAIG3-RFI-AG-C-0476-00
KAIG3-RFI-AG-C-0475 00 KAIG3-RFI-AG-C-0475-00
KAIG3-RFI-AG-S-4354 00 KAIG3-RFI-AG-S-4354-00
KAIG3-RFI-MB-S-4343 00 KAIG3-RFI-MB-S-4343-00
KAIG3-RFI-MB-S-4342 00 KAIG3-RFI-MB-S-4342-00
KAIG3-RFI-WG-LC-0194 03 KAIG3-RFI-WG-LC-0194-03
KAIG3-RFI-SG-LC-0214 00 KAIG3-RFI-SG-LC-0214-00
KAIG3-RFI-SG-LC-0213 00 KAIG3-RFI-SG-LC-0213-00
KAIG3-RFI-SG-LC-0212 00 KAIG3-RFI-SG-LC-0212-00
KAIG3-RFI-WG-LS-0490 00 KAIG3-RFI-WG-LS-0490-00
KAIG3-RFI-SG-S-4293 01 KAIG3-RFI-SG-S-4293-01
KAIG3-RFI-SG-A-0533 00 KAIG3-RFI-SG-A-0533-00
KAIG3-RFI-SG-A-0532 00 KAIG3-RFI-SG-A-0532-00
KAIG3-RFI-WG-S-4341 00 KAIG3-RFI-WG-S-4341-00
KAIG3-RFI-WG-SU-1629 00 KAIG3-RFI-WG-SU-1629-00
KAIG3-RFI-WG-S-4340 00 KAIG3-RFI-WG-S-4340-00
KAIG3-RFI-WG-SU-1628 00 KAIG3-RFI-WG-SU-1628-00
KAIG3-RFI-WG-S-4339 00 KAIG3-RFI-WG-S-4339-00
KAIG3-RFI-WG-SU-1627 00 KAIG3-RFI-WG-SU-1627-00
KAIG3-RFI-CO-S-4288 01 KAIG3-RFI-CO-S-4288-01
KAIG3-RFI-CO-S-4287 01 KAIG3-RFI-CO-S-4287-01
KAIG3-RFI-CO-SU-1617 01 KAIG3-RFI-CO-SU-1617-01
KAIG3-RFI-CO-SU-1626 00 KAIG3-RFI-CO-SU-1626-00
KAIG3-RFI-CO-S-4284 01 KAIG3-RFI-CO-S-4284-01
KAIG3-RFI-CO-S-4338 00 KAIG3-RFI-CO-S-4338-00
KAIG3-RFI-CO-S-4337 00 KAIG3-RFI-CO-S-4337-00
KAIG3-RFI-CO-S-4336 00 KAIG3-RFI-CO-S-4336-00
KAIG3-RFI-CO-S-4333 00 KAIG3-RFI-CO-S-4333-00
KAIG3-RFI-CO-S-4332 00 KAIG3-RFI-CO-S-4332-00
KAIG3-RFI-CO-S-4331 00 KAIG3-RFI-CO-S-4331-00
KAIG3-RFI-SG-E-0237 00 KAIG3-RFI-SG-E-0237-00
KAIG3-RFI-MB-A-0531 00 KAIG3-RFI-MB-A-0531-00
KAIG3-RFI-MB-S-4335 00 KAIG3-RFI-MB-S-4335-00
KAIG3-RFI-MB-S-4334 00 KAIG3-RFI-MB-S-4334-00
KAIG3-RFI-MB-A-0530 00 KAIG3-RFI-MB-A-0530-00
KAIG3-RFI-SG-A-0521 01 KAIG3-RFI-SG-A-0521-01
KAIG3-RFI-SW-A-0529 00 KAIG3-RFI-SW-A-0529-00
KAIG3-RFI-SW-A-0528 00 KAIG3-RFI-SW-A-0528-00
KAIG3-RFI-SW-A-0504 01 KAIG3-RFI-SW-A-0504-01
KAIG3-RFI-SW-A-0503 01 KAIG3-RFI-SW-A-0503-01
KAIG3-RFI-WG-S-4329 00 KAIG3-RFI-WG-S-4329-00
KAIG3-RFI-WG-S-4305 00 KAIG3-RFI-WG-S-4305-00
KAIG3-RFI-WG-S-4304 00 KAIG3-RFI-WG-S-4304-00
KAIG3-RFI-WG-LS-0478 03 KAIG3-RFI-WG-LS-0478-03
KAIG3-RFI-PA-C-0467 00 KAIG3-RFI-PA-C-0467-00
KAIG3-RFI-SW-C-0466 00 KAIG3-RFI-SW-C-0466-00
KAIG3-RFI-SW-C-0465 00 KAIG3-RFI-SW-C-0465-00
KAIG3-RFI-SW-C-0464 00 KAIG3-RFI-SW-C-0464-00
KAIG3-RFI-SW-C-0463 00 KAIG3-RFI-SW-C-0463-00
KAIG3-RFI-SW-C-0462 00 KAIG3-RFI-SW-C-0462-00
KAIG3-RFI-SW-C-0461 00 KAIG3-RFI-SW-C-0461-00
KAIG3-RFI-SW-C-0460 00 KAIG3-RFI-SW-C-0460-00
KAIG3-RFI-SW-C-0459 00 KAIG3-RFI-SW-C-0459-00
KAIG3-RFI-SW-C-0469 00 KAIG3-RFI-SW-C-0469-00
KAIG3-RFI-SW-C-0468 00 KAIG3-RFI-SW-C-0468-00
KAIG3-RFI-MB-LC-0211 00 KAIG3-RFI-MB-LC-0211-00
KAIG3-RFI-SW-M-0138 00 KAIG3-RFI-SW-M-0138-00
KAIG3-RFI-CO-SU-1623 00 KAIG3-RFI-CO-SU-1623-00
KAIG3-RFI-CO-SU-1622 00 KAIG3-RFI-CO-SU-1622-00
KAIG3-RFI-CO-SU-1625 00 KAIG3-RFI-CO-SU-1625-00
KAIG3-RFI-CO-S-4323 00 KAIG3-RFI-CO-S-4323-00
KAIG3-RFI-CO-C-0458 00 KAIG3-RFI-CO-C-0458-00
KAIG3-RFI-CO-S-4328 00 KAIG3-RFI-CO-S-4328-00
KAIG3-RFI-CO-S-4327 00 KAIG3-RFI-CO-S-4327-00
KAIG3-RFI-CO-S-4326 00 KAIG3-RFI-CO-S-4326-00
KAIG3-RFI-CO-S-4322 00 KAIG3-RFI-CO-S-4322-00
KAIG3-RFI-CO-S-4321 00 KAIG3-RFI-CO-S-4321-00
KAIG3-RFI-MB-A-0527 00 KAIG3-RFI-MB-A-0527-00
KAIG3-RFI-MB-A-0526 00 KAIG3-RFI-MB-A-0526-00
KAIG3-RFI-CO-S-4320 00 KAIG3-RFI-CO-S-4320-00
KAIG3-RFI-CO-S-4319 00 KAIG3-RFI-CO-S-4319-00
KAIG3-RFI-CO-S-4318 00 KAIG3-RFI-CO-S-4318-00
KAIG3-RFI-CO-S-4317 00 KAIG3-RFI-CO-S-4317-00
KAIG3-RFI-CO-S-4316 00 KAIG3-RFI-CO-S-4316-00
KAIG3-RFI-CO-S-4315 00 KAIG3-RFI-CO-S-4315-00
KAIG3-RFI-CO-S-4314 00 KAIG3-RFI-CO-S-4314-00
KAIG3-RFI-CO-S-4313 00 KAIG3-RFI-CO-S-4313-00
KAIG3-RFI-CO-S-4124 02 KAIG3-RFI-CO-S-4124-02
KAIG3-RFI-CO-S-4203 01 KAIG3-RFI-CO-S-4203-01
KAIG3-RFI-CO-S-4244 01 KAIG3-RFI-CO-S-4244-01
KAIG3-RFI-CO-S-4249 01 KAIG3-RFI-CO-S-4249-01
KAIG3-RFI-CO-E-0236 00 KAIG3-RFI-CO-E-0236-00
KAIG3-RFI-CO-E-0235 00 KAIG3-RFI-CO-E-0235-00
KAIG3-RFI-SW-C-0457 00 KAIG3-RFI-SW-C-0457-00
KAIG3-RFI-SW-C-0456 00 KAIG3-RFI-SW-C-0456-00
KAIG3-RFI-PA-C-0455 00 KAIG3-RFI-PA-C-0455-00
KAIG3-RFI-PA-C-0454 00 KAIG3-RFI-PA-C-0454-00
KAIG3-RFI-PA-C-0453 00 KAIG3-RFI-PA-C-0453-00
KAIG3-RFI-CO-SU-1621 00 KAIG3-RFI-CO-SU-1621-00
KAIG3-RFI-SW-C-0452 00 KAIG3-RFI-SW-C-0452-00
KAIG3-RFI-CO-SU-1620 00 KAIG3-RFI-CO-SU-1620-00
KAIG3-RFI-SW-C-0451 00 KAIG3-RFI-SW-C-0451-00
KAIG3-RFI-CO-S-4312 00 KAIG3-RFI-CO-S-4312-00
KAIG3-RFI-CO-S-4311 00 KAIG3-RFI-CO-S-4311-00
KAIG3-RFI-CO-S-4310 00 KAIG3-RFI-CO-S-4310-00
KAIG3-RFI-CO-S-4309 00 KAIG3-RFI-CO-S-4309-00
KAIG3-RFI-CO-S-4308 00 KAIG3-RFI-CO-S-4308-00
KAIG3-RFI-CO-S-4307 00 KAIG3-RFI-CO-S-4307-00
KAIG3-RFI-CO-S-4306 00 KAIG3-RFI-CO-S-4306-00
KAIG3-RFI-CO-S-4247 01 KAIG3-RFI-CO-S-4247-01
KAIG3-RFI-CO-S-4303 00 KAIG3-RFI-CO-S-4303-00
KAIG3-RFI-CO-S-4302 00 KAIG3-RFI-CO-S-4302-00
KAIG3-RFI-CO-S-4301 00 KAIG3-RFI-CO-S-4301-00
KAIG3-RFI-CO-S-4300 00 KAIG3-RFI-CO-S-4300-00
KAIG3-RFI-CO-S-4299-00 00 KAIG3-RFI-CO-S-4299-00-00
KAIG3-RFI-AG-S-4245 01 KAIG3-RFI-AG-S-4245-01
KAIG3-RFI-WG-S-4219 01 KAIG3-RFI-WG-S-4219-01
KAIG3-RFI-WG-S-4218 01 KAIG3-RFI-WG-S-4218-01
KAIG3-RFI-AG-C-0450 00 KAIG3-RFI-AG-C-0450-00
KAIG3-RFI-MB-M-0137 00 KAIG3-RFI-MB-M-0137-00
KAIG3-RFI-CO-SU-1619 00 KAIG3-RFI-CO-SU-1619-00
KAIG3-RFI-CO-S-4298 00 KAIG3-RFI-CO-S-4298-00
KAIG3-RFI-SW-C-0449 00 KAIG3-RFI-SW-C-0449-00
KAIG3-RFI-PA-C-0448 00 KAIG3-RFI-PA-C-0448-00
KAIG3-RFI-PA-C-0447 00 KAIG3-RFI-PA-C-0447-00
KAIG3-RFI-PA-C-0446 00 KAIG3-RFI-PA-C-0446-00
KAIG3-RFI-PA-C-0445 00 KAIG3-RFI-PA-C-0445-00
KAIG3-RFI-MB-A-0525 00 KAIG3-RFI-MB-A-0525-00
KAIG3-RFI-MB-A-0524 00 KAIG3-RFI-MB-A-0524-00
KAIG3-RFI-WG-A-0523 00 KAIG3-RFI-WG-A-0523-00
KAIG3-RFI-WG-A-0522 00 KAIG3-RFI-WG-A-0522-00
KAIG3-RFI-CO-S-4297 00 KAIG3-RFI-CO-S-4297-00
KAIG3-RFI-CO-S-4296 00 KAIG3-RFI-CO-S-4296-00
KAIG3-RFI-CO-S-2783 01 KAIG3-RFI-CO-S-2783-01
KAIG3-RFI-CO-SU-1579 01 KAIG3-RFI-CO-SU-1579-01
KAIG3-RFI-SW-C-0444 00 KAIG3-RFI-SW-C-0444-00
KAIG3-RFI-SW-C-0443 00 KAIG3-RFI-SW-C-0443-00
KAIG3-RFI-SW-C-0442 00 KAIG3-RFI-SW-C-0442-00
KAIG3-RFI-SW-C-0441 00 KAIG3-RFI-SW-C-0441-00
KAIG3-RFI-SW-C-0440 00 KAIG3-RFI-SW-C-0440-00
KAIG3-RFI-CO-E-0234 00 KAIG3-RFI-CO-E-0234-00
KAIG3-RFI-CO-LC-0210 00 KAIG3-RFI-CO-LC-0210-00
KAIG3-RFI-CO-LC-0209 00 KAIG3-RFI-CO-LC-0209-00
KAIG3-RFI-CO-LC-0208 00 KAIG3-RFI-CO-LC-0208-00
KAIG3-RFI-WG-LS-0489 00 KAIG3-RFI-WG-LS-0489-00
KAIG3-RFI-WG-LS-0488 00 KAIG3-RFI-WG-LS-0488-00
KAIG3-RFI-PA-C-0438 00 KAIG3-RFI-PA-C-0438-00
KAIG3-RFI-WG-C-0439 00 KAIG3-RFI-WG-C-0439-00
KAIG3-RFI-PA-C-0437 00 KAIG3-RFI-PA-C-0437-00
KAIG3-RFI-SG-A-0521 00 KAIG3-RFI-SG-A-0521-00
KAIG3-RFI-SW-C-0436 00 KAIG3-RFI-SW-C-0436-00
KAIG3-RFI-ZG-S-4294 00 KAIG3-RFI-ZG-S-4294-00
KAIG3-RFI-SG-S-4293 00 KAIG3-RFI-SG-S-4293-00
KAIG3-RFI-MB-A-0520 00 KAIG3-RFI-MB-A-0520-00
KAIG3-RFI-WG-LS-0487 00 KAIG3-RFI-WG-LS-0487-00
KAIG3-RFI-WG-S-4289 00 KAIG3-RFI-WG-S-4289-00
KAIG3-RFI-CO-S-4295 00 KAIG3-RFI-CO-S-4295-00
KAIG3-RFI-CO-S-4292 00 KAIG3-RFI-CO-S-4292-00
KAIG3-RFI-CO-S-4291 00 KAIG3-RFI-CO-S-4291-00
KAIG3-RFI-CO-S-4290 00 KAIG3-RFI-CO-S-4290-00
KAIG3-RFI-WG-LC-0194 02 KAIG3-RFI-WG-LC-0194-02
KAIG3-RFI-CO-SU-1618 00 KAIG3-RFI-CO-SU-1618-00
KAIG3-RFI-CO-SU-1617 00 KAIG3-RFI-CO-SU-1617-00
KAIG3-RFI-CO-SU-1616 00 KAIG3-RFI-CO-SU-1616-00
KAIG3-RFI-CO-SU-1615 00 KAIG3-RFI-CO-SU-1615-00
KAIG3-RFI-CO-S-4288 00 KAIG3-RFI-CO-S-4288-00
KAIG3-RFI-CO-S-4287 00 KAIG3-RFI-CO-S-4287-00
KAIG3-RFI-CO-S-4286 00 KAIG3-RFI-CO-S-4286-00
KAIG3-RFI-CO-S-4285 00 KAIG3-RFI-CO-S-4285-00
KAIG3-RFI-CO-S-4284 00 KAIG3-RFI-CO-S-4284-00
KAIG3-RFI-CO-S-4283 00 KAIG3-RFI-CO-S-4283-00
KAIG3-RFI-MB-M-0136 00 KAIG3-RFI-MB-M-0136-00
KAIG3-RFI-CO-SU-1613 00 KAIG3-RFI-CO-SU-1613-00
KAIG3-RFI-CO-S-4282 00 KAIG3-RFI-CO-S-4282-00
KAIG3-RFI-PA-C-0435 00 KAIG3-RFI-PA-C-0435-00
KAIG3-RFI-PA-C-0434 00 KAIG3-RFI-PA-C-0434-00
KAIG3-RFI-SW-C-0433 00 KAIG3-RFI-SW-C-0433-00
KAIG3-RFI-SW-C-0432 00 KAIG3-RFI-SW-C-0432-00
KAIG3-RFI-WG-S-4279 00 KAIG3-RFI-WG-S-4279-00
KAIG3-RFI-WG-C-0431 00 KAIG3-RFI-WG-C-0431-00
KAIG3-RFI-ZG-S-4278 00 KAIG3-RFI-ZG-S-4278-00
KAIG3-RFI-ZG-S-4277 00 KAIG3-RFI-ZG-S-4277-00
KAIG3-RFI-ZG-S-4276 00 KAIG3-RFI-ZG-S-4276-00
KAIG3-RFI-SG-S-4275 00 KAIG3-RFI-SG-S-4275-00
KAIG3-RFI-SG-S-4274 00 KAIG3-RFI-SG-S-4274-00
KAIG3-RFI-SG-S-4273 00 KAIG3-RFI-SG-S-4273-00
KAIG3-RFI-SG-S-4272 00 KAIG3-RFI-SG-S-4272-00
KAIG3-RFI-CO-SU-1614 00 KAIG3-RFI-CO-SU-1614-00
KAIG3-RFI-CO-SU-1612 00 KAIG3-RFI-CO-SU-1612-00
KAIG3-RFI-CO-S-4281 00 KAIG3-RFI-CO-S-4281-00
KAIG3-RFI-CO-S-4280 00 KAIG3-RFI-CO-S-4280-00
KAIG3-RFI-CO-S-4271 00 KAIG3-RFI-CO-S-4271-00
KAIG3-RFI-CO-S-4269 00 KAIG3-RFI-CO-S-4269-00
KAIG3-RFI-CO-S-4268 00 KAIG3-RFI-CO-S-4268-00
KAIG3-RFI-CO-S-4267 00 KAIG3-RFI-CO-S-4267-00
KAIG3-RFI-CO-C-0430 00 KAIG3-RFI-CO-C-0430-00
KAIG3-RFI-CO-SU-1610 00 KAIG3-RFI-CO-SU-1610-00
KAIG3-RFI-CO-SU-1609 00 KAIG3-RFI-CO-SU-1609-00
KAIG3-RFI-CO-SU-1608 00 KAIG3-RFI-CO-SU-1608-00
KAIG3-RFI-CO-SU-1607 00 KAIG3-RFI-CO-SU-1607-00
KAIG3-RFI-CO-S-4257 00 KAIG3-RFI-CO-S-4257-00
KAIG3-RFI-CO-S-4256 00 KAIG3-RFI-CO-S-4256-00
KAIG3-RFI-CO-S-4255 00 KAIG3-RFI-CO-S-4255-00
KAIG3-RFI-WG-S-4266 00 KAIG3-RFI-WG-S-4266-00
KAIG3-RFI-CO-S-4254 00 KAIG3-RFI-CO-S-4254-00
KAIG3-RFI-WG-S-4265 00 KAIG3-RFI-WG-S-4265-00
KAIG3-RFI-WG-S-4264 00 KAIG3-RFI-WG-S-4264-00
KAIG3-RFI-CO-S-4253 00 KAIG3-RFI-CO-S-4253-00
KAIG3-RFI-WG-S-4104 01 KAIG3-RFI-WG-S-4104-01
KAIG3-RFI-CO-S-4252 00 KAIG3-RFI-CO-S-4252-00
KAIG3-RFI-WG-S-4263 00 KAIG3-RFI-WG-S-4263-00
KAIG3-RFI-CO-S-4251 00 KAIG3-RFI-CO-S-4251-00
KAIG3-RFI-WG-S-4262 00 KAIG3-RFI-WG-S-4262-00
KAIG3-RFI-WG-S-4261 00 KAIG3-RFI-WG-S-4261-00
KAIG3-RFI-MC-S-4007 02 KAIG3-RFI-MC-S-4007-02
KAIG3-RFI-WG-S-4260 00 KAIG3-RFI-WG-S-4260-00
KAIG3-RFI-WG-S-4259 00 KAIG3-RFI-WG-S-4259-00
KAIG3-RFI-WG-S-4258 00 KAIG3-RFI-WG-S-4258-00
KAIG3-RFI-MC-S-4006 02 KAIG3-RFI-MC-S-4006-02
KAIG3-RFI-CO-S-4122 01 KAIG3-RFI-CO-S-4122-01
KAIG3-RFI-WG-SU-1611 00 KAIG3-RFI-WG-SU-1611-00
KAIG3-RFI-CO-S-4183 01 KAIG3-RFI-CO-S-4183-01
KAIG3-RFI-SW-C-0412 01 KAIG3-RFI-SW-C-0412-01
KAIG3-RFI-SW-C-0411 01 KAIG3-RFI-SW-C-0411-01
KAIG3-RFI-AG-S-4245 00 KAIG3-RFI-AG-S-4245-00
KAIG3-RFI-SW-C-0410 01 KAIG3-RFI-SW-C-0410-01
KAIG3-RFI-SW-C-0404 01 KAIG3-RFI-SW-C-0404-01
KAIG3-RFI-SW-C-0402 01 KAIG3-RFI-SW-C-0402-01
KAIG3-RFI-CO-S-4182 01 KAIG3-RFI-CO-S-4182-01
KAIG3-RFI-CO-S-4250 00 KAIG3-RFI-CO-S-4250-00
KAIG3-RFI-PA-C-0429 00 KAIG3-RFI-PA-C-0429-00
KAIG3-RFI-SW-C-0428 00 KAIG3-RFI-SW-C-0428-00
KAIG3-RFI-CO-SU-1606 00 KAIG3-RFI-CO-SU-1606-00
KAIG3-RFI-CO-S-4249 00 KAIG3-RFI-CO-S-4249-00
KAIG3-RFI-CO-S-4248 00 KAIG3-RFI-CO-S-4248-00
KAIG3-RFI-VG-LC-0207 00 KAIG3-RFI-VG-LC-0207-00
KAIG3-RFI-VG-E-0233 00 KAIG3-RFI-VG-E-0233-00
KAIG3-RFI-CO-E-0232 00 KAIG3-RFI-CO-E-0232-00
KAIG3-RFI-CO-E-0231 00 KAIG3-RFI-CO-E-0231-00
KAIG3-RFI-CO-E-0230 00 KAIG3-RFI-CO-E-0230-00
KAIG3-RFI-AG-SU-1603 00 KAIG3-RFI-AG-SU-1603-00
KAIG3-RFI-AG-C-0425 00 KAIG3-RFI-AG-C-0425-00
KAIG3-RFI-WG-LS-0478 02 KAIG3-RFI-WG-LS-0478-02
KAIG3-RFI-MB-A-0519 00 KAIG3-RFI-MB-A-0519-00
KAIG3-RFI-SG-S-4244 00 KAIG3-RFI-SG-S-4244-00
KAIG3-RFI-SG-SU-1602 00 KAIG3-RFI-SG-SU-1602-00
KAIG3-RFI-SG-C-0424 00 KAIG3-RFI-SG-C-0424-00
KAIG3-RFI-PA-C-0427 00 KAIG3-RFI-PA-C-0427-00
KAIG3-RFI-PA-C-0426 00 KAIG3-RFI-PA-C-0426-00
KAIG3-RFI-CO-E-0229 00 KAIG3-RFI-CO-E-0229-00
KAIG3-RFI-CO-SU-1605 00 KAIG3-RFI-CO-SU-1605-00
KAIG3-RFI-CO-SU-1604 00 KAIG3-RFI-CO-SU-1604-00
KAIG3-RFI-CO-S-4107 01 KAIG3-RFI-CO-S-4107-01
KAIG3-RFI-CO-S-4247 00 KAIG3-RFI-CO-S-4247-00
KAIG3-RFI-CO-S-4246 00 KAIG3-RFI-CO-S-4246-00
KAIG3-RFI-CO-S-4241 00 KAIG3-RFI-CO-S-4241-00
KAIG3-RFI-SW-M-0409 00 KAIG3-RFI-SW-M-0409-00
KAIG3-RFI-SW-M-0407 00 KAIG3-RFI-SW-M-0407-00
KAIG3-RFI-CO-SU-1586 01 KAIG3-RFI-CO-SU-1586-01
KAIG3-RFI-CO-SU-1601 00 KAIG3-RFI-CO-SU-1601-00
KAIG3-RFI-SA-SU-1600 00 KAIG3-RFI-SA-SU-1600-00
KAIG3-RFI-CO-S-4244 00 KAIG3-RFI-CO-S-4244-00
KAIG3-RFI-CO-S-4243 00 KAIG3-RFI-CO-S-4243-00
KAIG3-RFI-CO-S-4242 00 KAIG3-RFI-CO-S-4242-00
KAIG3-RFI-MB-A-0518 00 KAIG3-RFI-MB-A-0518-00
KAIG3-RFI-SA-S-4236 00 KAIG3-RFI-SA-S-4236-00
KAIG3-RFI-SG-S-4240 00 KAIG3-RFI-SG-S-4240-00
KAIG3-RFI-SG-S-4239 00 KAIG3-RFI-SG-S-4239-00
KAIG3-RFI-MB-S-4238 00 KAIG3-RFI-MB-S-4238-00
KAIG3-RFI-MB-S-4237 00 KAIG3-RFI-MB-S-4237-00
KAIG3-RFI-WG-S-4229 00 KAIG3-RFI-WG-S-4229-00
KAIG3-RFI-WG-SU-1597 00 KAIG3-RFI-WG-SU-1597-00
KAIG3-RFI-CO-S-4194 01 KAIG3-RFI-CO-S-4194-01
KAIG3-RFI-CO-S-4193 01 KAIG3-RFI-CO-S-4193-01
KAIG3-RFI-WG-S-4228 00 KAIG3-RFI-WG-S-4228-00
KAIG3-RFI-WG-S-4227 00 KAIG3-RFI-WG-S-4227-00
KAIG3-RFI-WG-C-0415 00 KAIG3-RFI-WG-C-0415-00
KAIG3-RFI-CO-E-0228 00 KAIG3-RFI-CO-E-0228-00
KAIG3-RFI-CO-E-0227 00 KAIG3-RFI-CO-E-0227-00
KAIG3-RFI-CO-E-0226 00 KAIG3-RFI-CO-E-0226-00
KAIG3-RFI-SG-S-4177 00 KAIG3-RFI-SG-S-4177-00
KAIG3-RFI-ZG-S-4225 00 KAIG3-RFI-ZG-S-4225-00
KAIG3-RFI-ZG-S-4224 00 KAIG3-RFI-ZG-S-4224-00
KAIG3-RFI-WG-SU-1595 00 KAIG3-RFI-WG-SU-1595-00
KAIG3-RFI-WG-SU-1594 00 KAIG3-RFI-WG-SU-1594-00
KAIG3-RFI-WG-S-4219 00 KAIG3-RFI-WG-S-4219-00
KAIG3-RFI-WG-S-4218 00 KAIG3-RFI-WG-S-4218-00
KAIG3-RFI-MB-A-0517 00 KAIG3-RFI-MB-A-0517-00
KAIG3-RFI-WG-S-4223 00 KAIG3-RFI-WG-S-4223-00
KAIG3-RFI-WG-S-4222 00 KAIG3-RFI-WG-S-4222-00
KAIG3-RFI-WG-S-4221 00 KAIG3-RFI-WG-S-4221-00
KAIG3-RFI-WG-S-4220 00 KAIG3-RFI-WG-S-4220-00
KAIG3-RFI-WG-SU-1596 00 KAIG3-RFI-WG-SU-1596-00
KAIG3-RFI-WG-LS-0485 00 KAIG3-RFI-WG-LS-0485-00
KAIG3-RFI-CO-SU-1599 00 KAIG3-RFI-CO-SU-1599-00
KAIG3-RFI-CO-SU-1589 00 KAIG3-RFI-CO-SU-1589-00
KAIG3-RFI-CO-SU-1588 00 KAIG3-RFI-CO-SU-1588-00
KAIG3-RFI-CO-SU-1598 00 KAIG3-RFI-CO-SU-1598-00
KAIG3-RFI-CO-SU-1594 00 KAIG3-RFI-CO-SU-1594-00
KAIG3-RFI-CO-SU-1593 00 KAIG3-RFI-CO-SU-1593-00
KAIG3-RFI-CO-S-4191 01 KAIG3-RFI-CO-S-4191-01
KAIG3-RFI-CO-S-4192 01 KAIG3-RFI-CO-S-4192-01
KAIG3-RFI-SA-S-4235 00 KAIG3-RFI-SA-S-4235-00
KAIG3-RFI-CO-S-4234 00 KAIG3-RFI-CO-S-4234-00
KAIG3-RFI-CO-S-4233 00 KAIG3-RFI-CO-S-4233-00
KAIG3-RFI-CO-S-4232 00 KAIG3-RFI-CO-S-4232-00
KAIG3-RFI-CO-S-4231 00 KAIG3-RFI-CO-S-4231-00
KAIG3-RFI-CO-S-4230 00 KAIG3-RFI-CO-S-4230-00
KAIG3-RFI-SW-C-0423 00 KAIG3-RFI-SW-C-0423-00
KAIG3-RFI-SW-C-0422 00 KAIG3-RFI-SW-C-0422-00
KAIG3-RFI-SW-C-0421 00 KAIG3-RFI-SW-C-0421-00
KAIG3-RFI-SW-C-0420 00 KAIG3-RFI-SW-C-0420-00
KAIG3-RFI-SW-C-0416 00 KAIG3-RFI-SW-C-0416-00
KAIG3-RFI-PA-C-0417 00 KAIG3-RFI-PA-C-0417-00
KAIG3-RFI-SW-C-0408 00 KAIG3-RFI-SW-C-0408-00
KAIG3-RFI-SW-C-0406 00 KAIG3-RFI-SW-C-0406-00
KAIG3-RFI-CO-C-0419 00 KAIG3-RFI-CO-C-0419-00
KAIG3-RFI-CO-C-0418 00 KAIG3-RFI-CO-C-0418-00
KAIG3-RFI-CO-S-4212 00 KAIG3-RFI-CO-S-4212-00
KAIG3-RFI-CO-S-4211 00 KAIG3-RFI-CO-S-4211-00
KAIG3-RFI-CO-S-4210 00 KAIG3-RFI-CO-S-4210-00
KAIG3-RFI-CO-S-4209 00 KAIG3-RFI-CO-S-4209-00
KAIG3-RFI-CO-S-4200 00 KAIG3-RFI-CO-S-4200-00
KAIG3-RFI-CO-S-4215 00 KAIG3-RFI-CO-S-4215-00
KAIG3-RFI-CO-S-4214 00 KAIG3-RFI-CO-S-4214-00
KAIG3-RFI-CO-S-4149 01 KAIG3-RFI-CO-S-4149-01
KAIG3-RFI-CO-S-4213 00 KAIG3-RFI-CO-S-4213-00
KAIG3-RFI-CO-S-4208 00 KAIG3-RFI-CO-S-4208-00
KAIG3-RFI-CO-S-4207 00 KAIG3-RFI-CO-S-4207-00
KAIG3-RFI-CO-S-4206 00 KAIG3-RFI-CO-S-4206-00
KAIG3-RFI-CO-S-4205 00 KAIG3-RFI-CO-S-4205-00
KAIG3-RFI-CO-S-4148 01 KAIG3-RFI-CO-S-4148-01
KAIG3-RFI-CO-S-4204 00 KAIG3-RFI-CO-S-4204-00
KAIG3-RFI-CO-S-4203 00 KAIG3-RFI-CO-S-4203-00
KAIG3-RFI-CO-S-4202 00 KAIG3-RFI-CO-S-4202-00
KAIG3-RFI-CO-S-4201 00 KAIG3-RFI-CO-S-4201-00
KAIG3-RFI-CO-SU-1592 00 KAIG3-RFI-CO-SU-1592-00
KAIG3-RFI-CO-SU-1591 00 KAIG3-RFI-CO-SU-1591-00
KAIG3-RFI-CO-SU-1590 00 KAIG3-RFI-CO-SU-1590-00
KAIG3-RFI-CO-S-4199 00 KAIG3-RFI-CO-S-4199-00
KAIG3-RFI-CO-S-4198 00 KAIG3-RFI-CO-S-4198-00
KAIG3-RFI-CO-S-4124 01 KAIG3-RFI-CO-S-4124-01
KAIG3-RFI-MB-S-4217 00 KAIG3-RFI-MB-S-4217-00
KAIG3-RFI-MB-A-0516 00 KAIG3-RFI-MB-A-0516-00
KAIG3-RFI-MB-S-4216 00 KAIG3-RFI-MB-S-4216-00
KAIG3-RFI-WG-S-4187 01 KAIG3-RFI-WG-S-4187-01
KAIG3-RFI-SG-S-4179 01 KAIG3-RFI-SG-S-4179-01
KAIG3-RFI-SG-S-4151 01 KAIG3-RFI-SG-S-4151-01
KAIG3-RFI-SG-S-4113 01 KAIG3-RFI-SG-S-4113-01
KAIG3-RFI-SG-SU-1587 00 KAIG3-RFI-SG-SU-1587-00
KAIG3-RFI-WG-LS-0486 00 KAIG3-RFI-WG-LS-0486-00
KAIG3-RFI-WG-A-0515 00 KAIG3-RFI-WG-A-0515-00
KAIG3-RFI-SW-C-0414 00 KAIG3-RFI-SW-C-0414-00
KAIG3-RFI-SW-C-0413 00 KAIG3-RFI-SW-C-0413-00
KAIG3-RFI-SW-C-0412 00 KAIG3-RFI-SW-C-0412-00
KAIG3-RFI-SW-C-0411 00 KAIG3-RFI-SW-C-0411-00
KAIG3-RFI-SW-C-0410 00 KAIG3-RFI-SW-C-0410-00
KAIG3-RFI-SW-C-0405 00 KAIG3-RFI-SW-C-0405-00
KAIG3-RFI-SW-C-0404 00 KAIG3-RFI-SW-C-0404-00
KAIG3-RFI-SW-C-0403 00 KAIG3-RFI-SW-C-0403-00
KAIG3-RFI-SW-C-0402 00 KAIG3-RFI-SW-C-0402-00
KAIG3-RFI-SW-C-0401 00 KAIG3-RFI-SW-C-0401-00
KAIG3-RFI-SW-C-0400 00 KAIG3-RFI-SW-C-0400-00
KAIG3-RFI-SW-C-0399 00 KAIG3-RFI-SW-C-0399-00
KAIG3-RFI-SW-C-0398 00 KAIG3-RFI-SW-C-0398-00
KAIG3-RFI-PA-C-0397 00 KAIG3-RFI-PA-C-0397-00
KAIG3-RFI-CO-SU-1586 00 KAIG3-RFI-CO-SU-1586-00
KAIG3-RFI-CO-S-4197 00 KAIG3-RFI-CO-S-4197-00
KAIG3-RFI-CO-S-4196 00 KAIG3-RFI-CO-S-4196-00
KAIG3-RFI-CO-S-4195 00 KAIG3-RFI-CO-S-4195-00
KAIG3-RFI-CO-S-4194 00 KAIG3-RFI-CO-S-4194-00
KAIG3-RFI-CO-S-4193 00 KAIG3-RFI-CO-S-4193-00
KAIG3-RFI-CO-S-4192 00 KAIG3-RFI-CO-S-4192-00
KAIG3-RFI-CO-S-4191 00 KAIG3-RFI-CO-S-4191-00
KAIG3-RFI-WG-S-4103 00 KAIG3-RFI-WG-S-4103-00
KAIG3-RFI-CO-LC-0203 00 KAIG3-RFI-CO-LC-0203-00
KAIG3-RFI-CO-LC-0202 00 KAIG3-RFI-CO-LC-0202-00
KAIG3-RFI-CO-LC-0201 00 KAIG3-RFI-CO-LC-0201-00
KAIG3-RFI-CO-E-0225 00 KAIG3-RFI-CO-E-0225-00
KAIG3-RFI-CO-E-0224 00 KAIG3-RFI-CO-E-0224-00
KAIG3-RFI-WG-A-0514 00 KAIG3-RFI-WG-A-0514-00
KAIG3-RFI-WG-C-0396 00 KAIG3-RFI-WG-C-0396-00
KAIG3-RFI-WG-S-4190 00 KAIG3-RFI-WG-S-4190-00
KAIG3-RFI-WG-S-4189 00 KAIG3-RFI-WG-S-4189-00
KAIG3-RFI-WG-S-4188 00 KAIG3-RFI-WG-S-4188-00
KAIG3-RFI-WG-S-4187 00 KAIG3-RFI-WG-S-4187-00
KAIG3-RFI-WG-S-4186 00 KAIG3-RFI-WG-S-4186-00
KAIG3-RFI-MB-A-0513 00 KAIG3-RFI-MB-A-0513-00
KAIG3-RFI-MB-A-0512 00 KAIG3-RFI-MB-A-0512-00
KAIG3-RFI-SG-S-4179 00 KAIG3-RFI-SG-S-4179-00
KAIG3-RFI-SG-S-4178 00 KAIG3-RFI-SG-S-4178-00
KAIG3-RFI-SG-SU-1585 00 KAIG3-RFI-SG-SU-1585-00
KAIG3-RFI-SG-SU-1584 00 KAIG3-RFI-SG-SU-1584-00
KAIG3-RFI-WG-S-4176 00 KAIG3-RFI-WG-S-4176-00
KAIG3-RFI-CO-S-4185 00 KAIG3-RFI-CO-S-4185-00
KAIG3-RFI-CO-S-4184 00 KAIG3-RFI-CO-S-4184-00
KAIG3-RFI-CO-S-4183 00 KAIG3-RFI-CO-S-4183-00
KAIG3-RFI-CO-S-4182 00 KAIG3-RFI-CO-S-4182-00
KAIG3-RFI-CO-S-4181 00 KAIG3-RFI-CO-S-4181-00
KAIG3-RFI-CO-S-4180 00 KAIG3-RFI-CO-S-4180-00
KAIG3-RFI-CO-S-4156 00 KAIG3-RFI-CO-S-4156-00
KAIG3-RFI-MC-S-4065 01 KAIG3-RFI-MC-S-4065-01
KAIG3-RFI-WG-LC-0194 01 KAIG3-RFI-WG-LC-0194-01
KAIG3-RFI-SW-C-0394 00 KAIG3-RFI-SW-C-0394-00
KAIG3-RFI-SW-C-0393 00 KAIG3-RFI-SW-C-0393-00
KAIG3-RFI-ZG-S-4175 00 KAIG3-RFI-ZG-S-4175-00
KAIG3-RFI-WG-S-4174 00 KAIG3-RFI-WG-S-4174-00
KAIG3-RFI-WG-S-4173 00 KAIG3-RFI-WG-S-4173-00
KAIG3-RFI-WG-S-4172 00 KAIG3-RFI-WG-S-4172-00
KAIG3-RFI-WG-S-4171 00 KAIG3-RFI-WG-S-4171-00
KAIG3-RFI-WG-S-4170 00 KAIG3-RFI-WG-S-4170-00
KAIG3-RFI-WG-S-4169 00 KAIG3-RFI-WG-S-4169-00
KAIG3-RFI-WG-S-4168 00 KAIG3-RFI-WG-S-4168-00
KAIG3-RFI-WG-S-4167 00 KAIG3-RFI-WG-S-4167-00
KAIG3-RFI-WG-S-4166 00 KAIG3-RFI-WG-S-4166-00
KAIG3-RFI-WG-LS-0484 00 KAIG3-RFI-WG-LS-0484-00
KAIG3-RFI-WG-LS-0483 00 KAIG3-RFI-WG-LS-0483-00
KAIG3-RFI-WG-LS-0482 00 KAIG3-RFI-WG-LS-0482-00
KAIG3-RFI-WG-LS-0481 00 KAIG3-RFI-WG-LS-0481-00
KAIG3-RFI-WG-LS-0480 00 KAIG3-RFI-WG-LS-0480-00
KAIG3-RFI-WG-S-4165 00 KAIG3-RFI-WG-S-4165-00
KAIG3-RFI-WG-SU-1583 00 KAIG3-RFI-WG-SU-1583-00
KAIG3-RFI-MC-S-4066 01 KAIG3-RFI-MC-S-4066-01
KAIG3-RFI-MC-S-4008 01 KAIG3-RFI-MC-S-4008-01
KAIG3-RFI-MC-S-4007 01 KAIG3-RFI-MC-S-4007-01
KAIG3-RFI-MC-S-4006 01 KAIG3-RFI-MC-S-4006-01
KAIG3-RFI-CO-S-3770 02 KAIG3-RFI-CO-S-3770-02
KAIG3-RFI-SW-M-0135 00 KAIG3-RFI-SW-M-0135-00
KAIG3-RFI-SW-C-0392 00 KAIG3-RFI-SW-C-0392-00
KAIG3-RFI-WG-S-4164 00 KAIG3-RFI-WG-S-4164-00
KAIG3-RFI-WG-S-4163 00 KAIG3-RFI-WG-S-4163-00
KAIG3-RFI-WG-S-4162 00 KAIG3-RFI-WG-S-4162-00
KAIG3-RFI-WG-S-4161 00 KAIG3-RFI-WG-S-4161-00
KAIG3-RFI-WG-S-4105 01 KAIG3-RFI-WG-S-4105-01
KAIG3-RFI-WG-S-4152 00 KAIG3-RFI-WG-S-4152-00
KAIG3-RFI-MB-A-0511 00 KAIG3-RFI-MB-A-0511-00
KAIG3-RFI-WG-S-3998 01 KAIG3-RFI-WG-S-3998-01
KAIG3-RFI-WG-S-3997 01 KAIG3-RFI-WG-S-3997-01
KAIG3-RFI-WG-S-4154 00 KAIG3-RFI-WG-S-4154-00
KAIG3-RFI-WG-S-4153 00 KAIG3-RFI-WG-S-4153-00
KAIG3-RFI-WG-SU-1581 00 KAIG3-RFI-WG-SU-1581-00
KAIG3-RFI-SG-S-4151 00 KAIG3-RFI-SG-S-4151-00
KAIG3-RFI-SG-S-4150 00 KAIG3-RFI-SG-S-4150-00
KAIG3-RFI-MB-A-0510 00 KAIG3-RFI-MB-A-0510-00
KAIG3-RFI-CO-SU-1582 00 KAIG3-RFI-CO-SU-1582-00
KAIG3-RFI-CO-S-4160 00 KAIG3-RFI-CO-S-4160-00
KAIG3-RFI-CO-S-4159 00 KAIG3-RFI-CO-S-4159-00
KAIG3-RFI-CO-S-4158 00 KAIG3-RFI-CO-S-4158-00
KAIG3-RFI-CO-S-4157 00 KAIG3-RFI-CO-S-4157-00
KAIG3-RFI-CO-S-4155 00 KAIG3-RFI-CO-S-4155-00
KAIG3-RFI-SW-C-0391 00 KAIG3-RFI-SW-C-0391-00
KAIG3-RFI-WG-C-0390 00 KAIG3-RFI-WG-C-0390-00
KAIG3-RFI-PA-LS-0479 00 KAIG3-RFI-PA-LS-0479-00
KAIG3-RFI-SW-C-0389 00 KAIG3-RFI-SW-C-0389-00
KAIG3-RFI-WG-C-0144 00 KAIG3-RFI-WG-C-0144-00
KAIG3-RFI-AG-SU-0693 00 KAIG3-RFI-AG-SU-0693-00
KAIG3-RFI-TB-SU-0453 00 KAIG3-RFI-TB-SU-0453-00
KAIG3-RFI-CO-SU-1580 00 KAIG3-RFI-CO-SU-1580-00
KAIG3-RFI-CO-SU-1579 00 KAIG3-RFI-CO-SU-1579-00
KAIG3-RFI-CO-SU-1578 00 KAIG3-RFI-CO-SU-1578-00
KAIG3-RFI-CO-S-4149 00 KAIG3-RFI-CO-S-4149-00
KAIG3-RFI-CO-S-4148 00 KAIG3-RFI-CO-S-4148-00
KAIG3-RFI-CO-S-4147 00 KAIG3-RFI-CO-S-4147-00
KAIG3-RFI-CO-S-4146 00 KAIG3-RFI-CO-S-4146-00
KAIG3-RFI-WG-LC-0200 00 KAIG3-RFI-WG-LC-0200-00
KAIG3-RFI-WG-LC-0199 00 KAIG3-RFI-WG-LC-0199-00
KAIG3-RFI-CO-LC-0198 00 KAIG3-RFI-CO-LC-0198-00
KAIG3-RFI-CO-SU-1577 00 KAIG3-RFI-CO-SU-1577-00
KAIG3-RFI-CO-S-4143 00 KAIG3-RFI-CO-S-4143-00
KAIG3-RFI-CO-S-4142 00 KAIG3-RFI-CO-S-4142-00
KAIG3-RFI-CO-S-4141 00 KAIG3-RFI-CO-S-4141-00
KAIG3-RFI-WG-S-4145 00 KAIG3-RFI-WG-S-4145-00
KAIG3-RFI-WG-S-4144 00 KAIG3-RFI-WG-S-4144-00
KAIG3-RFI-MB-A-0509 00 KAIG3-RFI-MB-A-0509-00
KAIG3-RFI-SW-C-0385 00 KAIG3-RFI-SW-C-0385-00
KAIG3-RFI-SW-C-0384 00 KAIG3-RFI-SW-C-0384-00
KAIG3-RFI-SW-C-0383 00 KAIG3-RFI-SW-C-0383-00
KAIG3-RFI-SW-C-0370 01 KAIG3-RFI-SW-C-0370-01
KAIG3-RFI-SW-C-0380 00 KAIG3-RFI-SW-C-0380-00
KAIG3-RFI-SW-C-0382 00 KAIG3-RFI-SW-C-0382-00
KAIG3-RFI-SW-M-0381 00 KAIG3-RFI-SW-M-0381-00
KAIG3-RFI-CO-SU-1576 00 KAIG3-RFI-CO-SU-1576-00
KAIG3-RFI-CO-SU-1575 00 KAIG3-RFI-CO-SU-1575-00
KAIG3-RFI-CO-S-4137 00 KAIG3-RFI-CO-S-4137-00
KAIG3-RFI-CO-S-4134 00 KAIG3-RFI-CO-S-4134-00
KAIG3-RFI-CO-S-4136 00 KAIG3-RFI-CO-S-4136-00
KAIG3-RFI-CO-S-4135 00 KAIG3-RFI-CO-S-4135-00
KAIG3-RFI-MB-A-0508 00 KAIG3-RFI-MB-A-0508-00
KAIG3-RFI-CO-C-0379 00 KAIG3-RFI-CO-C-0379-00
KAIG3-RFI-WG-S-4140 00 KAIG3-RFI-WG-S-4140-00
KAIG3-RFI-CO-S-4139 00 KAIG3-RFI-CO-S-4139-00
KAIG3-RFI-WG-S-4081 01 KAIG3-RFI-WG-S-4081-01
KAIG3-RFI-CO-LC-0197 00 KAIG3-RFI-CO-LC-0197-00
KAIG3-RFI-CO-LC-0196 00 KAIG3-RFI-CO-LC-0196-00
KAIG3-RFI-CO-E-0223 00 KAIG3-RFI-CO-E-0223-00
KAIG3-RFI-CO-E-0222 00 KAIG3-RFI-CO-E-0222-00
KAIG3-RFI-SW-C-0378 00 KAIG3-RFI-SW-C-0378-00
KAIG3-RFI-SW-C-0377 00 KAIG3-RFI-SW-C-0377-00
KAIG3-RFI-WG-C-0376 00 KAIG3-RFI-WG-C-0376-00
KAIG3-RFI-TB-S-4133 00 KAIG3-RFI-TB-S-4133-00
KAIG3-RFI-TB-S-4132 00 KAIG3-RFI-TB-S-4132-00
KAIG3-RFI-TB-S-4131 00 KAIG3-RFI-TB-S-4131-00
KAIG3-RFI-TB-S-4130 00 KAIG3-RFI-TB-S-4130-00
KAIG3-RFI-AG-S-4129 00 KAIG3-RFI-AG-S-4129-00
KAIG3-RFI-AG-S-4128 00 KAIG3-RFI-AG-S-4128-00
KAIG3-RFI-AG-S-4127 00 KAIG3-RFI-AG-S-4127-00
KAIG3-RFI-CO-S-4126 00 KAIG3-RFI-CO-S-4126-00
KAIG3-RFI-MB-A-0507 00 KAIG3-RFI-MB-A-0507-00
KAIG3-RFI-CO-S-4125 00 KAIG3-RFI-CO-S-4125-00
KAIG3-RFI-CO-S-4124 00 KAIG3-RFI-CO-S-4124-00
KAIG3-RFI-CO-S-4123 00 KAIG3-RFI-CO-S-4123-00
KAIG3-RFI-CO-S-4122 00 KAIG3-RFI-CO-S-4122-00
KAIG3-RFI-SG-LC-0195 00 KAIG3-RFI-SG-LC-0195-00
KAIG3-RFI-SG-S-4059 01 KAIG3-RFI-SG-S-4059-01
KAIG3-RFI-MB-A-0506 00 KAIG3-RFI-MB-A-0506-00
KAIG3-RFI-SG-S-4115 00 KAIG3-RFI-SG-S-4115-00
KAIG3-RFI-SG-SU-1572 00 KAIG3-RFI-SG-SU-1572-00
KAIG3-RFI-SG-S-4114 00 KAIG3-RFI-SG-S-4114-00
KAIG3-RFI-SG-SU-1571 00 KAIG3-RFI-SG-SU-1571-00
KAIG3-RFI-SG-S-4113 00 KAIG3-RFI-SG-S-4113-00
KAIG3-RFI-SG-SU-1570 00 KAIG3-RFI-SG-SU-1570-00
KAIG3-RFI-CO-S-4119 00 KAIG3-RFI-CO-S-4119-00
KAIG3-RFI-SA-S-4117 00 KAIG3-RFI-SA-S-4117-00
KAIG3-RFI-CO-SU-1574 00 KAIG3-RFI-CO-SU-1574-00
KAIG3-RFI-SA-SU-1573 00 KAIG3-RFI-SA-SU-1573-00
KAIG3-RFI-CO-SU-1555 01 KAIG3-RFI-CO-SU-1555-01
KAIG3-RFI-CO-SU-1568 00 KAIG3-RFI-CO-SU-1568-00
KAIG3-RFI-CO-S-4120 00 KAIG3-RFI-CO-S-4120-00
KAIG3-RFI-CO-S-4118 00 KAIG3-RFI-CO-S-4118-00
KAIG3-RFI-SA-S-4116 00 KAIG3-RFI-SA-S-4116-00
KAIG3-RFI-CO-S-4111 00 KAIG3-RFI-CO-S-4111-00
KAIG3-RFI-CO-S-4110 00 KAIG3-RFI-CO-S-4110-00
KAIG3-RFI-CO-S-4109 00 KAIG3-RFI-CO-S-4109-00
KAIG3-RFI-CO-S-4108 00 KAIG3-RFI-CO-S-4108-00
KAIG3-RFI-CO-S-4107 00 KAIG3-RFI-CO-S-4107-00
KAIG3-RFI-WG-S-4112 00 KAIG3-RFI-WG-S-4112-00
KAIG3-RFI-WG-SU-1569 00 KAIG3-RFI-WG-SU-1569-00
KAIG3-RFI-SW-C-0375 00 KAIG3-RFI-SW-C-0375-00
KAIG3-RFI-WG-S-4106 00 KAIG3-RFI-WG-S-4106-00
KAIG3-RFI-WG-SU-1567 00 KAIG3-RFI-WG-SU-1567-00
KAIG3-RFI-WG-S-4105 00 KAIG3-RFI-WG-S-4105-00
KAIG3-RFI-WG-S-4104 00 KAIG3-RFI-WG-S-4104-00
KAIG3-RFI-WG-S-4102 00 KAIG3-RFI-WG-S-4102-00
KAIG3-RFI-CO-S-4101 00 KAIG3-RFI-CO-S-4101-00
KAIG3-RFI-CO-S-4100 00 KAIG3-RFI-CO-S-4100-00
KAIG3-RFI-CO-S-4099 00 KAIG3-RFI-CO-S-4099-00
KAIG3-RFI-CO-S-4098 00 KAIG3-RFI-CO-S-4098-00
KAIG3-RFI-SW-C-0372 00 KAIG3-RFI-SW-C-0372-00
KAIG3-RFI-SW-C-0371 00 KAIG3-RFI-SW-C-0371-00
KAIG3-RFI-MB-A-0505 00 KAIG3-RFI-MB-A-0505-00
KAIG3-RFI-WG-LS-0478 01 KAIG3-RFI-WG-LS-0478-01
KAIG3-RFI-WG-S-4089 00 KAIG3-RFI-WG-S-4089-00
KAIG3-RFI-WG-SU-1565 00 KAIG3-RFI-WG-SU-1565-00
KAIG3-RFI-CO-S-4097 00 KAIG3-RFI-CO-S-4097-00
KAIG3-RFI-CO-S-4096 00 KAIG3-RFI-CO-S-4096-00
KAIG3-RFI-CO-S-4095 00 KAIG3-RFI-CO-S-4095-00
KAIG3-RFI-SW-A-0504 00 KAIG3-RFI-SW-A-0504-00
KAIG3-RFI-CO-S-4082 01 KAIG3-RFI-CO-S-4082-01
KAIG3-RFI-SW-A-0503 00 KAIG3-RFI-SW-A-0503-00
KAIG3-RFI-MB-S-4091 00 KAIG3-RFI-MB-S-4091-00
KAIG3-RFI-MB-S-4090 00 KAIG3-RFI-MB-S-4090-00
KAIG3-RFI-WG-A-0501 00 KAIG3-RFI-WG-A-0501-00
KAIG3-RFI-SW-A-0479 01 KAIG3-RFI-SW-A-0479-01
KAIG3-RFI-MB-A-0502 00 KAIG3-RFI-MB-A-0502-00
KAIG3-RFI-SW-C-0374 00 KAIG3-RFI-SW-C-0374-00
KAIG3-RFI-SW-C-0373 00 KAIG3-RFI-SW-C-0373-00
KAIG3-RFI-SW-C-0369 00 KAIG3-RFI-SW-C-0369-00
KAIG3-RFI-SW-C-0370 00 KAIG3-RFI-SW-C-0370-00
KAIG3-RFI-CO-SU-1566 00 KAIG3-RFI-CO-SU-1566-00
KAIG3-RFI-CO-SU-1447 01 KAIG3-RFI-CO-SU-1447-01
KAIG3-RFI-CO-S-3573 01 KAIG3-RFI-CO-S-3573-01
KAIG3-RFI-CO-S-3572 01 KAIG3-RFI-CO-S-3572-01
KAIG3-RFI-CO-S-4023 01 KAIG3-RFI-CO-S-4023-01
KAIG3-RFI-CO-S-4024 01 KAIG3-RFI-CO-S-4024-01
KAIG3-RFI-CO-S-4094 00 KAIG3-RFI-CO-S-4094-00
KAIG3-RFI-CO-S-4093 00 KAIG3-RFI-CO-S-4093-00
KAIG3-RFI-CO-S-4092 00 KAIG3-RFI-CO-S-4092-00
KAIG3-RFI-CO-S-4087 00 KAIG3-RFI-CO-S-4087-00
KAIG3-RFI-CO-S-4086 00 KAIG3-RFI-CO-S-4086-00
KAIG3-RFI-WG-S-4085 00 KAIG3-RFI-WG-S-4085-00
KAIG3-RFI-WG-S-4084 00 KAIG3-RFI-WG-S-4084-00
KAIG3-RFI-PA-S-4088 00 KAIG3-RFI-PA-S-4088-00
KAIG3-RFI-WG-A-0500 00 KAIG3-RFI-WG-A-0500-00
KAIG3-RFI-WG-LS-0478 00 KAIG3-RFI-WG-LS-0478-00
KAIG3-RFI-WG-LS-0477 00 KAIG3-RFI-WG-LS-0477-00
KAIG3-RFI-WG-LS-0475 01 KAIG3-RFI-WG-LS-0475-01
KAIG3-RFI-SG-S-4082 00 KAIG3-RFI-SG-S-4082-00
KAIG3-RFI-WG-S-4081 00 KAIG3-RFI-WG-S-4081-00
KAIG3-RFI-WG-SU-1564 00 KAIG3-RFI-WG-SU-1564-00
KAIG3-RFI-WG-S-4080 00 KAIG3-RFI-WG-S-4080-00
KAIG3-RFI-SG-S-4079 00 KAIG3-RFI-SG-S-4079-00
KAIG3-RFI-SG-S-4059 00 KAIG3-RFI-SG-S-4059-00
KAIG3-RFI-SG-S-4074 00 KAIG3-RFI-SG-S-4074-00
KAIG3-RFI-SG-SU-1561 00 KAIG3-RFI-SG-SU-1561-00
KAIG3-RFI-SR-E-0217 01 KAIG3-RFI-SR-E-0217-01
KAIG3-RFI-SW-C-0346 01 KAIG3-RFI-SW-C-0346-01
KAIG3-RFI-CO-S-4083 00 KAIG3-RFI-CO-S-4083-00
KAIG3-RFI-CO-S-3910 01 KAIG3-RFI-CO-S-3910-01
KAIG3-RFI-MC-S-3945 01 KAIG3-RFI-MC-S-3945-01
KAIG3-RFI-MC-S-3947 01 KAIG3-RFI-MC-S-3947-01
KAIG3-RFI-MC-S-3948 01 KAIG3-RFI-MC-S-3948-01
KAIG3-RFI-MC-S-3949 01 KAIG3-RFI-MC-S-3949-01
KAIG3-RFI-NA-S-3964 01 KAIG3-RFI-NA-S-3964-01
KAIG3-RFI-NA-S-3965 01 KAIG3-RFI-NA-S-3965-01
KAIG3-RFI-CO-S-3975 01 KAIG3-RFI-CO-S-3975-01
KAIG3-RFI-CO-S-3976 01 KAIG3-RFI-CO-S-3976-01
KAIG3-RFI-CO-S-3992 01 KAIG3-RFI-CO-S-3992-01
KAIG3-RFI-WG-S-4073 00 KAIG3-RFI-WG-S-4073-00
KAIG3-RFI-WG-SU-1560 00 KAIG3-RFI-WG-SU-1560-00
KAIG3-RFI-SG-S-4072 00 KAIG3-RFI-SG-S-4072-00
KAIG3-RFI-MB-S-4071 00 KAIG3-RFI-MB-S-4071-00
KAIG3-RFI-MB-S-4070 00 KAIG3-RFI-MB-S-4070-00
KAIG3-RFI-MB-A-0499 00 KAIG3-RFI-MB-A-0499-00
KAIG3-RFI-WG-S-3981 01 KAIG3-RFI-WG-S-3981-01
KAIG3-RFI-SW-C-0368 00 KAIG3-RFI-SW-C-0368-00
KAIG3-RFI-SW-C-0367 00 KAIG3-RFI-SW-C-0367-00
KAIG3-RFI-SW-C-0366 00 KAIG3-RFI-SW-C-0366-00
KAIG3-RFI-SW-C-0365 00 KAIG3-RFI-SW-C-0365-00
KAIG3-RFI-SW-C-0364 00 KAIG3-RFI-SW-C-0364-00
KAIG3-RFI-CO-SU-1563-00 00 KAIG3-RFI-CO-SU-1563-00-00
KAIG3-RFI-CO-SU-1562 00 KAIG3-RFI-CO-SU-1562-00
KAIG3-RFI-CO-S-3994 01 KAIG3-RFI-CO-S-3994-01
KAIG3-RFI-CO-S-4082 00 KAIG3-RFI-CO-S-4082-00
KAIG3-RFI-CO-S-4081 00 KAIG3-RFI-CO-S-4081-00
KAIG3-RFI-CO-S-4080 00 KAIG3-RFI-CO-S-4080-00
KAIG3-RFI-CO-S-4079 00 KAIG3-RFI-CO-S-4079-00
KAIG3-RFI-CO-C-0363 00 KAIG3-RFI-CO-C-0363-00
KAIG3-RFI-PA-C-0362 00 KAIG3-RFI-PA-C-0362-00
KAIG3-RFI-SW-C-0361 00 KAIG3-RFI-SW-C-0361-00
KAIG3-RFI-SW-C-0360 00 KAIG3-RFI-SW-C-0360-00
KAIG3-RFI-CO-S-4069 00 KAIG3-RFI-CO-S-4069-00
KAIG3-RFI-CO-S-4068 00 KAIG3-RFI-CO-S-4068-00
KAIG3-RFI-CO-S-4067 00 KAIG3-RFI-CO-S-4067-00
KAIG3-RFI-MC-S-4066 00 KAIG3-RFI-MC-S-4066-00
KAIG3-RFI-MC-S-4065 00 KAIG3-RFI-MC-S-4065-00
KAIG3-RFI-CO-S-4064 00 KAIG3-RFI-CO-S-4064-00
KAIG3-RFI-CO-S-4063 00 KAIG3-RFI-CO-S-4063-00
KAIG3-RFI-CO-SU-1559 00 KAIG3-RFI-CO-SU-1559-00
KAIG3-RFI-MC-SU-1558 00 KAIG3-RFI-MC-SU-1558-00
KAIG3-RFI-MC-SU-1557 00 KAIG3-RFI-MC-SU-1557-00
KAIG3-RFI-CO-SU-1556 00 KAIG3-RFI-CO-SU-1556-00
KAIG3-RFI-CO-SU-1555 00 KAIG3-RFI-CO-SU-1555-00
KAIG3-RFI-CO-S-4062 00 KAIG3-RFI-CO-S-4062-00
KAIG3-RFI-BO-LC-0193 01 KAIG3-RFI-BO-LC-0193-01
KAIG3-RFI-WG-LS-0476 00 KAIG3-RFI-WG-LS-0476-00
KAIG3-RFI-WG-LS-0468 01 KAIG3-RFI-WG-LS-0468-01
KAIG3-RFI-MB-E-0187 01 KAIG3-RFI-MB-E-0187-01
KAIG3-RFI-WG-LC-0194 00 KAIG3-RFI-WG-LC-0194-00
KAIG3-RFI-MB-E-0221 00 KAIG3-RFI-MB-E-0221-00
KAIG3-RFI-CO-SU-1552 00 KAIG3-RFI-CO-SU-1552-00
KAIG3-RFI-CO-S-4053 00 KAIG3-RFI-CO-S-4053-00
KAIG3-RFI-SW-C-0359 00 KAIG3-RFI-SW-C-0359-00
KAIG3-RFI-SW-C-0358 00 KAIG3-RFI-SW-C-0358-00
KAIG3-RFI-SW-C-0357 00 KAIG3-RFI-SW-C-0357-00
KAIG3-RFI-SW-C-0356 00 KAIG3-RFI-SW-C-0356-00
KAIG3-RFI-SW-C-0355 00 KAIG3-RFI-SW-C-0355-00
KAIG3-RFI-SW-C-0354 00 KAIG3-RFI-SW-C-0354-00
KAIG3-RFI-SW-C-0352 00 KAIG3-RFI-SW-C-0352-00
KAIG3-RFI-SW-C-0351 00 KAIG3-RFI-SW-C-0351-00
KAIG3-RFI-WG-S-4048 00 KAIG3-RFI-WG-S-4048-00
KAIG3-RFI-SW-C-0350 00 KAIG3-RFI-SW-C-0350-00
KAIG3-RFI-WG-S-4047 00 KAIG3-RFI-WG-S-4047-00
KAIG3-RFI-SG-S-4060 00 KAIG3-RFI-SG-S-4060-00
KAIG3-RFI-SW-C-0349 00 KAIG3-RFI-SW-C-0349-00
KAIG3-RFI-SG-SU-1554 00 KAIG3-RFI-SG-SU-1554-00
KAIG3-RFI-SW-C-0348 00 KAIG3-RFI-SW-C-0348-00
KAIG3-RFI-SG-S-4058 00 KAIG3-RFI-SG-S-4058-00
KAIG3-RFI-SG-SU-1553 00 KAIG3-RFI-SG-SU-1553-00
KAIG3-RFI-SW-C-0346 00 KAIG3-RFI-SW-C-0346-00
KAIG3-RFI-PG-C-0353 00 KAIG3-RFI-PG-C-0353-00
KAIG3-RFI-WG-A-0498 00 KAIG3-RFI-WG-A-0498-00
KAIG3-RFI-SW-C-0329 01 KAIG3-RFI-SW-C-0329-01
KAIG3-RFI-TB-S-4057 00 KAIG3-RFI-TB-S-4057-00
KAIG3-RFI-MB-A-0497 00 KAIG3-RFI-MB-A-0497-00
KAIG3-RFI-SW-C-0317 01 KAIG3-RFI-SW-C-0317-01
KAIG3-RFI-SW-C-0322 00 KAIG3-RFI-SW-C-0322-00
KAIG3-RFI-PA-S-4061 00 KAIG3-RFI-PA-S-4061-00
KAIG3-RFI-SG-S-4050 00 KAIG3-RFI-SG-S-4050-00
KAIG3-RFI-CO-SU-1544 00 KAIG3-RFI-CO-SU-1544-00
KAIG3-RFI-WG-S-4049 00 KAIG3-RFI-WG-S-4049-00
KAIG3-RFI-SW-A-0496 00 KAIG3-RFI-SW-A-0496-00
KAIG3-RFI-WG-S-4046 00 KAIG3-RFI-WG-S-4046-00
KAIG3-RFI-WG-S-4045 00 KAIG3-RFI-WG-S-4045-00
KAIG3-RFI-WG-S-4044 00 KAIG3-RFI-WG-S-4044-00
KAIG3-RFI-CO-SU-1551 00 KAIG3-RFI-CO-SU-1551-00
KAIG3-RFI-CO-S-4055 00 KAIG3-RFI-CO-S-4055-00
KAIG3-RFI-CO-S-4054 00 KAIG3-RFI-CO-S-4054-00
KAIG3-RFI-CO-S-4052 00 KAIG3-RFI-CO-S-4052-00
KAIG3-RFI-SW-C-0345 00 KAIG3-RFI-SW-C-0345-00
KAIG3-RFI-MB-P-0132 00 KAIG3-RFI-MB-P-0132-00
KAIG3-RFI-MB-P-0131 00 KAIG3-RFI-MB-P-0131-00
KAIG3-RFI-SG-S-4051 00 KAIG3-RFI-SG-S-4051-00
KAIG3-RFI-WG-S-4043 00 KAIG3-RFI-WG-S-4043-00
KAIG3-RFI-WG-SU-1548 00 KAIG3-RFI-WG-SU-1548-00
KAIG3-RFI-WG-SU-1549 00 KAIG3-RFI-WG-SU-1549-00
KAIG3-RFI-SG-SU-1550 00 KAIG3-RFI-SG-SU-1550-00
KAIG3-RFI-PA-S-4056 00 KAIG3-RFI-PA-S-4056-00
KAIG3-RFI-SW-C-0347 00 KAIG3-RFI-SW-C-0347-00
KAIG3-RFI-WG-S-4042 00 KAIG3-RFI-WG-S-4042-00
KAIG3-RFI-SG-S-4041 00 KAIG3-RFI-SG-S-4041-00
KAIG3-RFI-WG-C-0344 00 KAIG3-RFI-WG-C-0344-00
KAIG3-RFI-MB-A-0495 00 KAIG3-RFI-MB-A-0495-00
KAIG3-RFI-SG-S-4040 00 KAIG3-RFI-SG-S-4040-00
KAIG3-RFI-SG-SU-1547 00 KAIG3-RFI-SG-SU-1547-00
KAIG3-RFI-WG-S-4039 00 KAIG3-RFI-WG-S-4039-00
KAIG3-RFI-WG-SU-1546 00 KAIG3-RFI-WG-SU-1546-00
KAIG3-RFI-SG-SU-1545 00 KAIG3-RFI-SG-SU-1545-00
KAIG3-RFI-SG-S-4038 00 KAIG3-RFI-SG-S-4038-00
KAIG3-RFI-CO-SU-1532 01 KAIG3-RFI-CO-SU-1532-01
KAIG3-RFI-CO-S-3935 01 KAIG3-RFI-CO-S-3935-01
KAIG3-RFI-CO-S-4037 00 KAIG3-RFI-CO-S-4037-00
KAIG3-RFI-CO-S-4036 00 KAIG3-RFI-CO-S-4036-00
KAIG3-RFI-CO-S-4035 00 KAIG3-RFI-CO-S-4035-00
KAIG3-RFI-CO-S-4034 00 KAIG3-RFI-CO-S-4034-00
KAIG3-RFI-CO-S-4033 00 KAIG3-RFI-CO-S-4033-00
KAIG3-RFI-CO-S-4032 00 KAIG3-RFI-CO-S-4032-00
KAIG3-RFI-CO-SU-1543 00 KAIG3-RFI-CO-SU-1543-00
KAIG3-RFI-CO-S-4031 00 KAIG3-RFI-CO-S-4031-00
KAIG3-RFI-CO-S-4030 00 KAIG3-RFI-CO-S-4030-00
KAIG3-RFI-CO-S-4029 00 KAIG3-RFI-CO-S-4029-00
KAIG3-RFI-CO-S-4028 00 KAIG3-RFI-CO-S-4028-00
KAIG3-RFI-SW-C-0343 00 KAIG3-RFI-SW-C-0343-00
KAIG3-RFI-SW-C-0341 00 KAIG3-RFI-SW-C-0341-00
KAIG3-RFI-SW-C-0340 00 KAIG3-RFI-SW-C-0340-00
KAIG3-RFI-SW-C-0342 00 KAIG3-RFI-SW-C-0342-00
KAIG3-RFI-PA-S-4027 00 KAIG3-RFI-PA-S-4027-00
KAIG3-RFI-CO-SU-1542 00 KAIG3-RFI-CO-SU-1542-00
KAIG3-RFI-CO-S-4026 00 KAIG3-RFI-CO-S-4026-00
KAIG3-RFI-CO-S-4025 00 KAIG3-RFI-CO-S-4025-00
KAIG3-RFI-CO-S-4024 00 KAIG3-RFI-CO-S-4024-00
KAIG3-RFI-CO-S-4023 00 KAIG3-RFI-CO-S-4023-00
KAIG3-RFI-CO-S-3977 01 KAIG3-RFI-CO-S-3977-01
KAIG3-RFI-CO-S-3907 01 KAIG3-RFI-CO-S-3907-01
KAIG3-RFI-CO-SU-1517 01 KAIG3-RFI-CO-SU-1517-01
KAIG3-RFI-CO-S-3908 01 KAIG3-RFI-CO-S-3908-01
KAIG3-RFI-SW-LS-0453 01 KAIG3-RFI-SW-LS-0453-01
KAIG3-RFI-PA-S-4020 00 KAIG3-RFI-PA-S-4020-00
KAIG3-RFI-SG-S-4022 00 KAIG3-RFI-SG-S-4022-00
KAIG3-RFI-SG-SU-1541 00 KAIG3-RFI-SG-SU-1541-00
KAIG3-RFI-WG-S-4021 00 KAIG3-RFI-WG-S-4021-00
KAIG3-RFI-WG-SU-1540 00 KAIG3-RFI-WG-SU-1540-00
KAIG3-RFI-BO-LC-0193 00 KAIG3-RFI-BO-LC-0193-00
KAIG3-RFI-BO-E-0220 00 KAIG3-RFI-BO-E-0220-00
KAIG3-RFI-SW-C-0339 00 KAIG3-RFI-SW-C-0339-00
KAIG3-RFI-SW-C-0338 00 KAIG3-RFI-SW-C-0338-00
KAIG3-RFI-MC-S-4019 00 KAIG3-RFI-MC-S-4019-00
KAIG3-RFI-MC-S-4018 00 KAIG3-RFI-MC-S-4018-00
KAIG3-RFI-MC-S-4017 00 KAIG3-RFI-MC-S-4017-00
KAIG3-RFI-MC-S-4016 00 KAIG3-RFI-MC-S-4016-00
KAIG3-RFI-WG-S-4015 00 KAIG3-RFI-WG-S-4015-00
KAIG3-RFI-WG-S-4014 00 KAIG3-RFI-WG-S-4014-00
KAIG3-RFI-WG-SU-1539 00 KAIG3-RFI-WG-SU-1539-00
KAIG3-RFI-WG-S-4013 00 KAIG3-RFI-WG-S-4013-00
KAIG3-RFI-WG-S-4012 00 KAIG3-RFI-WG-S-4012-00
KAIG3-RFI-WG-S-4011 00 KAIG3-RFI-WG-S-4011-00
KAIG3-RFI-WG-S-4010 00 KAIG3-RFI-WG-S-4010-00
KAIG3-RFI-PG-C-0335 00 KAIG3-RFI-PG-C-0335-00
KAIG3-RFI-WG-LS-0475 00 KAIG3-RFI-WG-LS-0475-00
KAIG3-RFI-SG-S-3988 00 KAIG3-RFI-SG-S-3988-00
KAIG3-RFI-PA-C-0337 00 KAIG3-RFI-PA-C-0337-00
KAIG3-RFI-PA-C-0336 00 KAIG3-RFI-PA-C-0336-00
KAIG3-RFI-MB-LC-0192 00 KAIG3-RFI-MB-LC-0192-00
KAIG3-RFI-MB-LC-0191 00 KAIG3-RFI-MB-LC-0191-00
KAIG3-RFI-MB-LC-0190 00 KAIG3-RFI-MB-LC-0190-00
KAIG3-RFI-CO-LC-0189 01 KAIG3-RFI-CO-LC-0189-01
KAIG3-RFI-CO-SU-1538 00 KAIG3-RFI-CO-SU-1538-00
KAIG3-RFI-CO-S-4009 00 KAIG3-RFI-CO-S-4009-00
KAIG3-RFI-MC-S-4008 00 KAIG3-RFI-MC-S-4008-00
KAIG3-RFI-MC-S-4007 00 KAIG3-RFI-MC-S-4007-00
KAIG3-RFI-MC-S-4006 00 KAIG3-RFI-MC-S-4006-00
KAIG3-RFI-MC-S-4005 00 KAIG3-RFI-MC-S-4005-00
KAIG3-RFI-SW-C-0334 00 KAIG3-RFI-SW-C-0334-00
KAIG3-RFI-SW-C-0333 00 KAIG3-RFI-SW-C-0333-00
KAIG3-RFI-SW-C-0332 00 KAIG3-RFI-SW-C-0332-00
KAIG3-RFI-SW-C-0331 00 KAIG3-RFI-SW-C-0331-00
KAIG3-RFI-SW-C-0328 00 KAIG3-RFI-SW-C-0328-00
KAIG3-RFI-SG-S-4004 00 KAIG3-RFI-SG-S-4004-00
KAIG3-RFI-WG-LS-0468 00 KAIG3-RFI-WG-LS-0468-00
KAIG3-RFI-WG-C-0330 00 KAIG3-RFI-WG-C-0330-00
KAIG3-RFI-WG-S-4003 00 KAIG3-RFI-WG-S-4003-00
KAIG3-RFI-WG-S-4002 00 KAIG3-RFI-WG-S-4002-00
KAIG3-RFI-WG-S-4001 00 KAIG3-RFI-WG-S-4001-00
KAIG3-RFI-WG-S-4000 00 KAIG3-RFI-WG-S-4000-00
KAIG3-RFI-WG-S-3999 00 KAIG3-RFI-WG-S-3999-00
KAIG3-RFI-WG-S-3998 00 KAIG3-RFI-WG-S-3998-00
KAIG3-RFI-WG-S-3997 00 KAIG3-RFI-WG-S-3997-00
KAIG3-RFI-WG-S-3996 00 KAIG3-RFI-WG-S-3996-00
KAIG3-RFI-WG-S-3983 00 KAIG3-RFI-WG-S-3983-00
KAIG3-RFI-WG-S-3995 00 KAIG3-RFI-WG-S-3995-00
KAIG3-RFI-MB-A-0494 00 KAIG3-RFI-MB-A-0494-00
KAIG3-RFI-SG-S-3991 00 KAIG3-RFI-SG-S-3991-00
KAIG3-RFI-SG-SU-1536 00 KAIG3-RFI-SG-SU-1536-00
KAIG3-RFI-SG-SU-1535 00 KAIG3-RFI-SG-SU-1535-00
KAIG3-RFI-SG-S-3990 00 KAIG3-RFI-SG-S-3990-00
KAIG3-RFI-SG-S-3989 00 KAIG3-RFI-SG-S-3989-00
KAIG3-RFI-SG-SU-1534 00 KAIG3-RFI-SG-SU-1534-00
KAIG3-RFI-SG-S-3987 00 KAIG3-RFI-SG-S-3987-00
KAIG3-RFI-WG-S-3986 00 KAIG3-RFI-WG-S-3986-00
KAIG3-RFI-WG-S-3985 00 KAIG3-RFI-WG-S-3985-00
KAIG3-RFI-WG-S-3984 00 KAIG3-RFI-WG-S-3984-00
KAIG3-RFI-TB-SU-0515 01 KAIG3-RFI-TB-SU-0515-01
KAIG3-RFI-WG-S-3981 00 KAIG3-RFI-WG-S-3981-00
KAIG3-RFI-PA-S-3982 00 KAIG3-RFI-PA-S-3982-00
KAIG3-RFI-CO-SU-1537 00 KAIG3-RFI-CO-SU-1537-00
KAIG3-RFI-CO-S-3994 00 KAIG3-RFI-CO-S-3994-00
KAIG3-RFI-CO-S-3993 00 KAIG3-RFI-CO-S-3993-00
KAIG3-RFI-CO-S-3992 00 KAIG3-RFI-CO-S-3992-00
KAIG3-RFI-CO-E-0218 00 KAIG3-RFI-CO-E-0218-00
KAIG3-RFI-PA-S-3978 00 KAIG3-RFI-PA-S-3978-00
KAIG3-RFI-SW-LS-0463 01 KAIG3-RFI-SW-LS-0463-01
KAIG3-RFI-SW-C-0329 00 KAIG3-RFI-SW-C-0329-00
KAIG3-RFI-SW-C-0327 00 KAIG3-RFI-SW-C-0327-00
KAIG3-RFI-SW-C-0325 00 KAIG3-RFI-SW-C-0325-00
KAIG3-RFI-PA-C-0326 00 KAIG3-RFI-PA-C-0326-00
KAIG3-RFI-CO-LC-0189 00 KAIG3-RFI-CO-LC-0189-00
KAIG3-RFI-CO-LC-0188 00 KAIG3-RFI-CO-LC-0188-00
KAIG3-RFI-CO-LC-0187-00 00 KAIG3-RFI-CO-LC-0187-00-00
KAIG3-RFI-CO-E-0219 00 KAIG3-RFI-CO-E-0219-00
KAIG3-RFI-WG-SU-1533 00 KAIG3-RFI-WG-SU-1533-00
KAIG3-RFI-WG-S-3980 00 KAIG3-RFI-WG-S-3980-00
KAIG3-RFI-WG-S-3979 00 KAIG3-RFI-WG-S-3979-00
KAIG3-RFI-MB-A-0493 00 KAIG3-RFI-MB-A-0493-00
KAIG3-RFI-TB-S-3973 00 KAIG3-RFI-TB-S-3973-00
KAIG3-RFI-WG-S-3972 00 KAIG3-RFI-WG-S-3972-00
KAIG3-RFI-TB-SU-1530 00 KAIG3-RFI-TB-SU-1530-00
KAIG3-RFI-TB-S-3971 00 KAIG3-RFI-TB-S-3971-00
KAIG3-RFI-WG-S-3970 00 KAIG3-RFI-WG-S-3970-00
KAIG3-RFI-WG-S-3969 00 KAIG3-RFI-WG-S-3969-00
KAIG3-RFI-WG-S-3968 00 KAIG3-RFI-WG-S-3968-00
KAIG3-RFI-WG-S-3967 00 KAIG3-RFI-WG-S-3967-00
KAIG3-RFI-AG-S-3966 00 KAIG3-RFI-AG-S-3966-00
KAIG3-RFI-AG-SU-1529 00 KAIG3-RFI-AG-SU-1529-00
KAIG3-RFI-WG-S-3953 00 KAIG3-RFI-WG-S-3953-00
KAIG3-RFI-WG-S-3952 00 KAIG3-RFI-WG-S-3952-00
KAIG3-RFI-WG-S-3951 00 KAIG3-RFI-WG-S-3951-00
KAIG3-RFI-WG-S-3950 00 KAIG3-RFI-WG-S-3950-00
KAIG3-RFI-CO-S-3977 00 KAIG3-RFI-CO-S-3977-00
KAIG3-RFI-CO-S-3976 00 KAIG3-RFI-CO-S-3976-00
KAIG3-RFI-CO-S-3975 00 KAIG3-RFI-CO-S-3975-00
KAIG3-RFI-CO-S-3974 00 KAIG3-RFI-CO-S-3974-00
KAIG3-RFI-CO-SU-1532 00 KAIG3-RFI-CO-SU-1532-00
KAIG3-RFI-CO-SU-1531 00 KAIG3-RFI-CO-SU-1531-00
KAIG3-RFI-NA-S-3965 00 KAIG3-RFI-NA-S-3965-00
KAIG3-RFI-NA-S-3964 00 KAIG3-RFI-NA-S-3964-00
KAIG3-RFI-NA-S-3963 00 KAIG3-RFI-NA-S-3963-00
KAIG3-RFI-NA-S-3962 00 KAIG3-RFI-NA-S-3962-00
KAIG3-RFI-CO-S-3961 00 KAIG3-RFI-CO-S-3961-00
KAIG3-RFI-CO-S-3960 00 KAIG3-RFI-CO-S-3960-00
KAIG3-RFI-CO-S-3959 00 KAIG3-RFI-CO-S-3959-00
KAIG3-RFI-CO-S-3958 00 KAIG3-RFI-CO-S-3958-00
KAIG3-RFI-CO-S-3957 00 KAIG3-RFI-CO-S-3957-00
KAIG3-RFI-CO-S-3956 00 KAIG3-RFI-CO-S-3956-00
KAIG3-RFI-SW-C-0321 00 KAIG3-RFI-SW-C-0321-00
KAIG3-RFI-SW-C-0320 00 KAIG3-RFI-SW-C-0320-00
KAIG3-RFI-SW-C-0323 00 KAIG3-RFI-SW-C-0323-00
KAIG3-RFI-SW-C-0324 00 KAIG3-RFI-SW-C-0324-00
KAIG3-RFI-PA-S-3955 00 KAIG3-RFI-PA-S-3955-00
KAIG3-RFI-PA-S-3954 00 KAIG3-RFI-PA-S-3954-00
KAIG3-RFI-SR-E-0217 00 KAIG3-RFI-SR-E-0217-00
KAIG3-RFI-SW-LS-0474 00 KAIG3-RFI-SW-LS-0474-00
KAIG3-RFI-SW-LS-0473 00 KAIG3-RFI-SW-LS-0473-00
KAIG3-RFI-SW-LS-0472 00 KAIG3-RFI-SW-LS-0472-00
KAIG3-RFI-SW-LS-0471 00 KAIG3-RFI-SW-LS-0471-00
KAIG3-RFI-SW-LS-0470 00 KAIG3-RFI-SW-LS-0470-00
KAIG3-RFI-PA-S-3940 00 KAIG3-RFI-PA-S-3940-00
KAIG3-RFI-PA-S-3939 00 KAIG3-RFI-PA-S-3939-00
KAIG3-RFI-PA-S-3938 00 KAIG3-RFI-PA-S-3938-00
KAIG3-RFI-SG-SU-1526 00 KAIG3-RFI-SG-SU-1526-00
KAIG3-RFI-SG-S-3943 00 KAIG3-RFI-SG-S-3943-00
KAIG3-RFI-TB-S-3462 02 KAIG3-RFI-TB-S-3462-02
KAIG3-RFI-TB-S-3942 00 KAIG3-RFI-TB-S-3942-00
KAIG3-RFI-WG-S-3941 00 KAIG3-RFI-WG-S-3941-00
KAIG3-RFI-SW-A-0492 00 KAIG3-RFI-SW-A-0492-00
KAIG3-RFI-MC-S-3949 00 KAIG3-RFI-MC-S-3949-00
KAIG3-RFI-MC-S-3948 00 KAIG3-RFI-MC-S-3948-00
KAIG3-RFI-MC-S-3947 00 KAIG3-RFI-MC-S-3947-00
KAIG3-RFI-SW-A-0488 01 KAIG3-RFI-SW-A-0488-01
KAIG3-RFI-MC-S-3946 00 KAIG3-RFI-MC-S-3946-00
KAIG3-RFI-MC-S-3945 00 KAIG3-RFI-MC-S-3945-00
KAIG3-RFI-WG-SU-1519 00 KAIG3-RFI-WG-SU-1519-00
KAIG3-RFI-CO-SU-1528 00 KAIG3-RFI-CO-SU-1528-00
KAIG3-RFI-CO-SU-1527 00 KAIG3-RFI-CO-SU-1527-00
KAIG3-RFI-CO-S-3944 00 KAIG3-RFI-CO-S-3944-00
KAIG3-RFI-MB-E-0216-00 00 KAIG3-RFI-MB-E-0216-00-00
KAIG3-RFI-WG-S-3933 00 KAIG3-RFI-WG-S-3933-00
KAIG3-RFI-SW-C-0276 00 KAIG3-RFI-SW-C-0276-00
KAIG3-RFI-WG-SU-1522 00 KAIG3-RFI-WG-SU-1522-00
KAIG3-RFI-WG-S-3932 00 KAIG3-RFI-WG-S-3932-00
KAIG3-RFI-SW-C-0317 00 KAIG3-RFI-SW-C-0317-00
KAIG3-RFI-WG-S-3931 00 KAIG3-RFI-WG-S-3931-00
KAIG3-RFI-SW-C-0316 00 KAIG3-RFI-SW-C-0316-00
KAIG3-RFI-SG-S-3930 00 KAIG3-RFI-SG-S-3930-00
KAIG3-RFI-SW-LS-0469 00 KAIG3-RFI-SW-LS-0469-00
KAIG3-RFI-SW-C-0315 00 KAIG3-RFI-SW-C-0315-00
KAIG3-RFI-SG-SU-1521 00 KAIG3-RFI-SG-SU-1521-00
KAIG3-RFI-SW-C-0314 00 KAIG3-RFI-SW-C-0314-00
KAIG3-RFI-MB-A-0491 00 KAIG3-RFI-MB-A-0491-00
KAIG3-RFI-SW-C-0313 00 KAIG3-RFI-SW-C-0313-00
KAIG3-RFI-SW-C-0312 00 KAIG3-RFI-SW-C-0312-00
KAIG3-RFI-CO-SU-1525 00 KAIG3-RFI-CO-SU-1525-00
KAIG3-RFI-SW-C-0311 00 KAIG3-RFI-SW-C-0311-00
KAIG3-RFI-MC-SU-1524 00 KAIG3-RFI-MC-SU-1524-00
KAIG3-RFI-SW-C-0310 00 KAIG3-RFI-SW-C-0310-00
KAIG3-RFI-MC-SU-1523 00 KAIG3-RFI-MC-SU-1523-00
KAIG3-RFI-SW-C-0309 00 KAIG3-RFI-SW-C-0309-00
KAIG3-RFI-MC-S-3937 00 KAIG3-RFI-MC-S-3937-00
KAIG3-RFI-MC-S-3936 00 KAIG3-RFI-MC-S-3936-00
KAIG3-RFI-CO-S-3935 00 KAIG3-RFI-CO-S-3935-00
KAIG3-RFI-CO-C-0318 00 KAIG3-RFI-CO-C-0318-00
KAIG3-RFI-SA-S-3934 00 KAIG3-RFI-SA-S-3934-00
KAIG3-RFI-WG-C-0307 00 KAIG3-RFI-WG-C-0307-00
KAIG3-RFI-WG-C-0306 00 KAIG3-RFI-WG-C-0306-00
KAIG3-RFI-PG-C-0305 00 KAIG3-RFI-PG-C-0305-00
KAIG3-RFI-WG-C-0304 00 KAIG3-RFI-WG-C-0304-00
KAIG3-RFI-AG-S-3927 00 KAIG3-RFI-AG-S-3927-00
KAIG3-RFI-WG-S-3926 00 KAIG3-RFI-WG-S-3926-00
KAIG3-RFI-AG-S-3925 00 KAIG3-RFI-AG-S-3925-00
KAIG3-RFI-PA-S-3920 00 KAIG3-RFI-PA-S-3920-00
KAIG3-RFI-PA-S-3921 00 KAIG3-RFI-PA-S-3921-00
KAIG3-RFI-PA-C-0301 00 KAIG3-RFI-PA-C-0301-00
KAIG3-RFI-PA-C-0300 00 KAIG3-RFI-PA-C-0300-00
KAIG3-RFI-PG-C-0308 00 KAIG3-RFI-PG-C-0308-00
KAIG3-RFI-SW-C-0303 00 KAIG3-RFI-SW-C-0303-00
KAIG3-RFI-MC-S-3929 00 KAIG3-RFI-MC-S-3929-00
KAIG3-RFI-MC-S-3928 00 KAIG3-RFI-MC-S-3928-00
KAIG3-RFI-MB-E-0215 00 KAIG3-RFI-MB-E-0215-00
KAIG3-RFI-MC-S-3923 00 KAIG3-RFI-MC-S-3923-00
KAIG3-RFI-MC-S-3922 00 KAIG3-RFI-MC-S-3922-00
KAIG3-RFI-CO-S-3924 00 KAIG3-RFI-CO-S-3924-00
KAIG3-RFI-SW-C-0302 00 KAIG3-RFI-SW-C-0302-00
KAIG3-RFI-MB-E-0214 00 KAIG3-RFI-MB-E-0214-00
KAIG3-RFI-SW-C-0299 00 KAIG3-RFI-SW-C-0299-00
KAIG3-RFI-WG-S-3919 00 KAIG3-RFI-WG-S-3919-00
KAIG3-RFI-WG-S-3918 00 KAIG3-RFI-WG-S-3918-00
KAIG3-RFI-WG-S-3917 00 KAIG3-RFI-WG-S-3917-00
KAIG3-RFI-WG-LS-0467 00 KAIG3-RFI-WG-LS-0467-00
KAIG3-RFI-CO-S-3851 01 KAIG3-RFI-CO-S-3851-01
KAIG3-RFI-CO-S-3847 01 KAIG3-RFI-CO-S-3847-01
KAIG3-RFI-CO-S-3846 01 KAIG3-RFI-CO-S-3846-01
KAIG3-RFI-CO-S-3831 01 KAIG3-RFI-CO-S-3831-01
KAIG3-RFI-CO-E-0213 00 KAIG3-RFI-CO-E-0213-00
KAIG3-RFI-SW-LS-0466 00 KAIG3-RFI-SW-LS-0466-00
KAIG3-RFI-SW-S-3900 00 KAIG3-RFI-SW-S-3900-00
KAIG3-RFI-PA-S-3899 00 KAIG3-RFI-PA-S-3899-00
KAIG3-RFI-SW-S-3880 00 KAIG3-RFI-SW-S-3880-00
KAIG3-RFI-SW-S-3672 00 KAIG3-RFI-SW-S-3672-00
KAIG3-RFI-SW-S-3671 00 KAIG3-RFI-SW-S-3671-00
KAIG3-RFI-MB-A-0490 00 KAIG3-RFI-MB-A-0490-00
KAIG3-RFI-WG-S-3916 00 KAIG3-RFI-WG-S-3916-00
KAIG3-RFI-WG-S-3915 00 KAIG3-RFI-WG-S-3915-00
KAIG3-RFI-WG-S-3914 00 KAIG3-RFI-WG-S-3914-00
KAIG3-RFI-WG-S-3913 00 KAIG3-RFI-WG-S-3913-00
KAIG3-RFI-MB-A-0489 00 KAIG3-RFI-MB-A-0489-00
KAIG3-RFI-ZG-LS-0375 01 KAIG3-RFI-ZG-LS-0375-01
KAIG3-RFI-SG-S-3898 00 KAIG3-RFI-SG-S-3898-00
KAIG3-RFI-SG-S-3897 00 KAIG3-RFI-SG-S-3897-00
KAIG3-RFI-WG-LS-0465 00 KAIG3-RFI-WG-LS-0465-00
KAIG3-RFI-WG-C-0298 00 KAIG3-RFI-WG-C-0298-00
KAIG3-RFI-CO-S-3912 00 KAIG3-RFI-CO-S-3912-00
KAIG3-RFI-CO-S-3909 00 KAIG3-RFI-CO-S-3909-00
KAIG3-RFI-CO-S-3902 00 KAIG3-RFI-CO-S-3902-00
KAIG3-RFI-CO-S-3911 00 KAIG3-RFI-CO-S-3911-00
KAIG3-RFI-CO-S-3910 00 KAIG3-RFI-CO-S-3910-00
KAIG3-RFI-CO-S-3908 00 KAIG3-RFI-CO-S-3908-00
KAIG3-RFI-CO-S-3907 00 KAIG3-RFI-CO-S-3907-00
KAIG3-RFI-CO-S-3906 00 KAIG3-RFI-CO-S-3906-00
KAIG3-RFI-CO-S-3905 00 KAIG3-RFI-CO-S-3905-00
KAIG3-RFI-CO-S-3904 00 KAIG3-RFI-CO-S-3904-00
KAIG3-RFI-CO-S-3903 00 KAIG3-RFI-CO-S-3903-00
KAIG3-RFI-CO-SU-1518 00 KAIG3-RFI-CO-SU-1518-00
KAIG3-RFI-CO-SU-1517 00 KAIG3-RFI-CO-SU-1517-00
KAIG3-RFI-CO-SU-1516 00 KAIG3-RFI-CO-SU-1516-00
KAIG3-RFI-MC-SU-1520 00 KAIG3-RFI-MC-SU-1520-00
KAIG3-RFI-MC-S-3901 00 KAIG3-RFI-MC-S-3901-00
KAIG3-RFI-CO-LC-0186 00 KAIG3-RFI-CO-LC-0186-00
KAIG3-RFI-CO-LC-0185 00 KAIG3-RFI-CO-LC-0185-00
KAIG3-RFI-MB-E-0212 00 KAIG3-RFI-MB-E-0212-00
KAIG3-RFI-CO-E-0211 00 KAIG3-RFI-CO-E-0211-00
KAIG3-RFI-CO-E-0210 00 KAIG3-RFI-CO-E-0210-00
KAIG3-RFI-CO-E-0209 00 KAIG3-RFI-CO-E-0209-00
KAIG3-RFI-CO-LC-0184 00 KAIG3-RFI-CO-LC-0184-00
KAIG3-RFI-SW-S-3881 00 KAIG3-RFI-SW-S-3881-00
KAIG3-RFI-SW-LS-0463 00 KAIG3-RFI-SW-LS-0463-00
KAIG3-RFI-SW-LS-0462 00 KAIG3-RFI-SW-LS-0462-00
KAIG3-RFI-SW-C-0297 00 KAIG3-RFI-SW-C-0297-00
KAIG3-RFI-PG-LS-0464 00 KAIG3-RFI-PG-LS-0464-00
KAIG3-RFI-AG-S-3896 00 KAIG3-RFI-AG-S-3896-00
KAIG3-RFI-WG-S-3895 00 KAIG3-RFI-WG-S-3895-00
KAIG3-RFI-WG-LS-0374 01 KAIG3-RFI-WG-LS-0374-01
KAIG3-RFI-SW-A-0488 00 KAIG3-RFI-SW-A-0488-00
KAIG3-RFI-WG-SU-1515 00 KAIG3-RFI-WG-SU-1515-00
KAIG3-RFI-SG-SU-1514 00 KAIG3-RFI-SG-SU-1514-00
KAIG3-RFI-SG-S-3894 00 KAIG3-RFI-SG-S-3894-00
KAIG3-RFI-WG-S-3893 00 KAIG3-RFI-WG-S-3893-00
KAIG3-RFI-WG-SU-1513 00 KAIG3-RFI-WG-SU-1513-00
KAIG3-RFI-AG-S-3892 00 KAIG3-RFI-AG-S-3892-00
KAIG3-RFI-AG-SU-1512 00 KAIG3-RFI-AG-SU-1512-00
KAIG3-RFI-WG-S-3891 00 KAIG3-RFI-WG-S-3891-00
KAIG3-RFI-WG-SU-1511 00 KAIG3-RFI-WG-SU-1511-00
KAIG3-RFI-SW-C-0291 00 KAIG3-RFI-SW-C-0291-00
KAIG3-RFI-SW-C-0296 00 KAIG3-RFI-SW-C-0296-00
KAIG3-RFI-SW-C-0295 00 KAIG3-RFI-SW-C-0295-00
KAIG3-RFI-SW-C-0294 00 KAIG3-RFI-SW-C-0294-00
KAIG3-RFI-SW-C-0293 00 KAIG3-RFI-SW-C-0293-00
KAIG3-RFI-SW-C-0292 00 KAIG3-RFI-SW-C-0292-00
KAIG3-RFI-SW-C-0290 00 KAIG3-RFI-SW-C-0290-00
KAIG3-RFI-MB-P-0124 01 KAIG3-RFI-MB-P-0124-01
KAIG3-RFI-WG-S-3888 00 KAIG3-RFI-WG-S-3888-00
KAIG3-RFI-PG-C-0289 00 KAIG3-RFI-PG-C-0289-00
KAIG3-RFI-PG-C-0288 00 KAIG3-RFI-PG-C-0288-00
KAIG3-RFI-MB-A-0487 00 KAIG3-RFI-MB-A-0487-00
KAIG3-RFI-WG-S-3887 00 KAIG3-RFI-WG-S-3887-00
KAIG3-RFI-CO-SU-1510 00 KAIG3-RFI-CO-SU-1510-00
KAIG3-RFI-WG-S-3819 00 KAIG3-RFI-WG-S-3819-00
KAIG3-RFI-CO-S-3890 00 KAIG3-RFI-CO-S-3890-00
KAIG3-RFI-WG-A-0486 00 KAIG3-RFI-WG-A-0486-00
KAIG3-RFI-SW-C-0287 00 KAIG3-RFI-SW-C-0287-00
KAIG3-RFI-CO-S-3889 00 KAIG3-RFI-CO-S-3889-00
KAIG3-RFI-AG-S-3885 00 KAIG3-RFI-AG-S-3885-00
KAIG3-RFI-AG-S-3886 00 KAIG3-RFI-AG-S-3886-00
KAIG3-RFI-WG-S-3884 00 KAIG3-RFI-WG-S-3884-00
KAIG3-RFI-MB-E-0179 01 KAIG3-RFI-MB-E-0179-01
KAIG3-RFI-CO-S-3828 01 KAIG3-RFI-CO-S-3828-01
KAIG3-RFI-SW-A-0449 00 KAIG3-RFI-SW-A-0449-00
KAIG3-RFI-BO-A-0164 00 KAIG3-RFI-BO-A-0164-00
KAIG3-RFI-SW-C-0286 00 KAIG3-RFI-SW-C-0286-00
KAIG3-RFI-SW-C-0285 00 KAIG3-RFI-SW-C-0285-00
KAIG3-RFI-SW-C-0284 00 KAIG3-RFI-SW-C-0284-00
KAIG3-RFI-SW-C-0283 00 KAIG3-RFI-SW-C-0283-00
KAIG3-RFI-WG-S-3643 01 KAIG3-RFI-WG-S-3643-01
KAIG3-RFI-WG-S-3642 01 KAIG3-RFI-WG-S-3642-01
KAIG3-RFI-TT-A-0234 01 KAIG3-RFI-TT-A-0234-01
KAIG3-RFI-SG-S-3883 00 KAIG3-RFI-SG-S-3883-00
KAIG3-RFI-SG-SU-1509 00 KAIG3-RFI-SG-SU-1509-00
KAIG3-RFI-SG-C-0280 00 KAIG3-RFI-SG-C-0280-00
KAIG3-RFI-WG-S-3882 00 KAIG3-RFI-WG-S-3882-00
KAIG3-RFI-TB-S-3462 01 KAIG3-RFI-TB-S-3462-01
KAIG3-RFI-SW-LS-0456 01 KAIG3-RFI-SW-LS-0456-01
KAIG3-RFI-SW-LS-0461 00 KAIG3-RFI-SW-LS-0461-00
KAIG3-RFI-SW-C-0282 00 KAIG3-RFI-SW-C-0282-00
KAIG3-RFI-SW-C-0281 00 KAIG3-RFI-SW-C-0281-00
KAIG3-RFI-MB-A-0485 00 KAIG3-RFI-MB-A-0485-00
KAIG3-RFI-MB-A-0484 00 KAIG3-RFI-MB-A-0484-00
KAIG3-RFI-SW-LS-0460 00 KAIG3-RFI-SW-LS-0460-00
KAIG3-RFI-SW-LS-0459 00 KAIG3-RFI-SW-LS-0459-00
KAIG3-RFI-CO-S-3790 01 KAIG3-RFI-CO-S-3790-01
KAIG3-RFI-CO-S-3770 01 KAIG3-RFI-CO-S-3770-01
KAIG3-RFI-CO-S-3722 01 KAIG3-RFI-CO-S-3722-01
KAIG3-RFI-CO-S-3710 01 KAIG3-RFI-CO-S-3710-01
KAIG3-RFI-CO-S-3654 01 KAIG3-RFI-CO-S-3654-01
KAIG3-RFI-CO-S-3876 00 KAIG3-RFI-CO-S-3876-00
KAIG3-RFI-CO-S-3875 00 KAIG3-RFI-CO-S-3875-00
KAIG3-RFI-CO-S-3874 00 KAIG3-RFI-CO-S-3874-00
KAIG3-RFI-WG-LC-0183 00 KAIG3-RFI-WG-LC-0183-00
KAIG3-RFI-MB-A-0465 02 KAIG3-RFI-MB-A-0465-02
KAIG3-RFI-SW-S-3879 00 KAIG3-RFI-SW-S-3879-00
KAIG3-RFI-WG-S-3878 00 KAIG3-RFI-WG-S-3878-00
KAIG3-RFI-WG-LC-0182 00 KAIG3-RFI-WG-LC-0182-00
KAIG3-RFI-WG-SU-1508 00 KAIG3-RFI-WG-SU-1508-00
KAIG3-RFI-AG-S-3877 00 KAIG3-RFI-AG-S-3877-00
KAIG3-RFI-WG-E-0208 00 KAIG3-RFI-WG-E-0208-00
KAIG3-RFI-SW-A-0483 00 KAIG3-RFI-SW-A-0483-00
KAIG3-RFI-WG-S-3867 00 KAIG3-RFI-WG-S-3867-00
KAIG3-RFI-WG-SU-1505 00 KAIG3-RFI-WG-SU-1505-00
KAIG3-RFI-WG-S-3866 00 KAIG3-RFI-WG-S-3866-00
KAIG3-RFI-SG-S-3865 00 KAIG3-RFI-SG-S-3865-00
KAIG3-RFI-SG-S-3864 00 KAIG3-RFI-SG-S-3864-00
KAIG3-RFI-SG-S-3863 00 KAIG3-RFI-SG-S-3863-00
KAIG3-RFI-SG-S-3861 00 KAIG3-RFI-SG-S-3861-00
KAIG3-RFI-SW-C-0279 00 KAIG3-RFI-SW-C-0279-00
KAIG3-RFI-SW-C-0278 00 KAIG3-RFI-SW-C-0278-00
KAIG3-RFI-SW-LS-0458 00 KAIG3-RFI-SW-LS-0458-00
KAIG3-RFI-SW-LS-0457 00 KAIG3-RFI-SW-LS-0457-00
KAIG3-RFI-SW-LS-0456 00 KAIG3-RFI-SW-LS-0456-00
KAIG3-RFI-SW-C-0274 00 KAIG3-RFI-SW-C-0274-00
KAIG3-RFI-CO-S-3801 01 KAIG3-RFI-CO-S-3801-01
KAIG3-RFI-CO-S-3802 01 KAIG3-RFI-CO-S-3802-01
KAIG3-RFI-CO-S-3726 02 KAIG3-RFI-CO-S-3726-02
KAIG3-RFI-TB-E-0207 00 KAIG3-RFI-TB-E-0207-00
KAIG3-RFI-CO-S-3725 02 KAIG3-RFI-CO-S-3725-02
KAIG3-RFI-CO-S-3724 02 KAIG3-RFI-CO-S-3724-02
KAIG3-RFI-CO-S-3873 00 KAIG3-RFI-CO-S-3873-00
KAIG3-RFI-CO-S-3872 00 KAIG3-RFI-CO-S-3872-00
KAIG3-RFI-CO-S-3871 00 KAIG3-RFI-CO-S-3871-00
KAIG3-RFI-CO-S-3870 00 KAIG3-RFI-CO-S-3870-00
KAIG3-RFI-TB-LC-0181 00 KAIG3-RFI-TB-LC-0181-00
KAIG3-RFI-TB-LC-0180 00 KAIG3-RFI-TB-LC-0180-00
KAIG3-RFI-TB-E-0206 00 KAIG3-RFI-TB-E-0206-00
KAIG3-RFI-SW-C-0277 00 KAIG3-RFI-SW-C-0277-00
KAIG3-RFI-SW-C-0271 00 KAIG3-RFI-SW-C-0271-00
KAIG3-RFI-TB-E-0205 00 KAIG3-RFI-TB-E-0205-00
KAIG3-RFI-TB-E-0204 00 KAIG3-RFI-TB-E-0204-00
KAIG3-RFI-TB-E-0203 00 KAIG3-RFI-TB-E-0203-00
KAIG3-RFI-TB-E-0202 00 KAIG3-RFI-TB-E-0202-00
KAIG3-RFI-TB-E-0201 00 KAIG3-RFI-TB-E-0201-00
KAIG3-RFI-TB-E-0200 00 KAIG3-RFI-TB-E-0200-00
KAIG3-RFI-TB-E-0199 00 KAIG3-RFI-TB-E-0199-00
KAIG3-RFI-CO-E-0198 00 KAIG3-RFI-CO-E-0198-00
KAIG3-RFI-CO-E-0197 00 KAIG3-RFI-CO-E-0197-00
KAIG3-RFI-CO-E-0196 00 KAIG3-RFI-CO-E-0196-00
KAIG3-RFI-CO-LC-0179 00 KAIG3-RFI-CO-LC-0179-00
KAIG3-RFI-CO-LC-0178 00 KAIG3-RFI-CO-LC-0178-00
KAIG3-RFI-CO-LC-0177 00 KAIG3-RFI-CO-LC-0177-00
KAIG3-RFI-SW-LS-0455 00 KAIG3-RFI-SW-LS-0455-00
KAIG3-RFI-SW-LS-0454 00 KAIG3-RFI-SW-LS-0454-00
KAIG3-RFI-SW-LS-0453 00 KAIG3-RFI-SW-LS-0453-00
KAIG3-RFI-PA-C-0269 00 KAIG3-RFI-PA-C-0269-00
KAIG3-RFI-SW-C-0266 00 KAIG3-RFI-SW-C-0266-00
KAIG3-RFI-SW-C-0258 00 KAIG3-RFI-SW-C-0258-00
KAIG3-RFI-PA-C-0268 00 KAIG3-RFI-PA-C-0268-00
KAIG3-RFI-SW-C-0273 00 KAIG3-RFI-SW-C-0273-00
KAIG3-RFI-PA-C-0267 00 KAIG3-RFI-PA-C-0267-00
KAIG3-RFI-SW-C-0272 00 KAIG3-RFI-SW-C-0272-00
KAIG3-RFI-CO-S-3858 00 KAIG3-RFI-CO-S-3858-00
KAIG3-RFI-WG-S-3869 00 KAIG3-RFI-WG-S-3869-00
KAIG3-RFI-WG-S-3868 00 KAIG3-RFI-WG-S-3868-00
KAIG3-RFI-WG-SU-1507 00 KAIG3-RFI-WG-SU-1507-00
KAIG3-RFI-WG-SU-1506 00 KAIG3-RFI-WG-SU-1506-00
KAIG3-RFI-WG-S-3857 00 KAIG3-RFI-WG-S-3857-00
KAIG3-RFI-WG-C-0270 00 KAIG3-RFI-WG-C-0270-00
KAIG3-RFI-SW-A-0482 00 KAIG3-RFI-SW-A-0482-00
KAIG3-RFI-SG-S-3862 00 KAIG3-RFI-SG-S-3862-00
KAIG3-RFI-SG-S-3860 00 KAIG3-RFI-SG-S-3860-00
KAIG3-RFI-SG-S-3859 00 KAIG3-RFI-SG-S-3859-00
KAIG3-RFI-WG-SU-1504 00 KAIG3-RFI-WG-SU-1504-00
KAIG3-RFI-CO-S-1520 01 KAIG3-RFI-CO-S-1520-01
KAIG3-RFI-CO-S-1902 00 KAIG3-RFI-CO-S-1902-00
KAIG3-RFI-CO-S-0173 00 KAIG3-RFI-CO-S-0173-00
KAIG3-RFI-CO-S-0166 00 KAIG3-RFI-CO-S-0166-00
KAIG3-RFI-CO-SU-1502 00 KAIG3-RFI-CO-SU-1502-00
KAIG3-RFI-MC-SU-1503 00 KAIG3-RFI-MC-SU-1503-00
KAIG3-RFI-SW-C-0264 00 KAIG3-RFI-SW-C-0264-00
KAIG3-RFI-SW-C-0263 00 KAIG3-RFI-SW-C-0263-00
KAIG3-RFI-WG-SU-1501 00 KAIG3-RFI-WG-SU-1501-00
KAIG3-RFI-WG-C-0265 00 KAIG3-RFI-WG-C-0265-00
KAIG3-RFI-WG-LS-0452 00 KAIG3-RFI-WG-LS-0452-00
KAIG3-RFI-TB-SU-1500 00 KAIG3-RFI-TB-SU-1500-00
KAIG3-RFI-WG-S-3852 00 KAIG3-RFI-WG-S-3852-00
KAIG3-RFI-WG-SU-1499 00 KAIG3-RFI-WG-SU-1499-00
KAIG3-RFI-SW-LS-0451 00 KAIG3-RFI-SW-LS-0451-00
KAIG3-RFI-SW-LS-0450 00 KAIG3-RFI-SW-LS-0450-00
KAIG3-RFI-PA-S-3856 00 KAIG3-RFI-PA-S-3856-00
KAIG3-RFI-CO-S-3855 00 KAIG3-RFI-CO-S-3855-00
KAIG3-RFI-CO-S-3854 00 KAIG3-RFI-CO-S-3854-00
KAIG3-RFI-CO-SU-1493 00 KAIG3-RFI-CO-SU-1493-00
KAIG3-RFI-CO-S-3853 00 KAIG3-RFI-CO-S-3853-00
KAIG3-RFI-SW-LS-0447 00 KAIG3-RFI-SW-LS-0447-00
KAIG3-RFI-SW-LS-0448 00 KAIG3-RFI-SW-LS-0448-00
KAIG3-RFI-SW-LS-0449 00 KAIG3-RFI-SW-LS-0449-00
KAIG3-RFI-AG-S-3849 00 KAIG3-RFI-AG-S-3849-00
KAIG3-RFI-WG-SU-1498 00 KAIG3-RFI-WG-SU-1498-00
KAIG3-RFI-SW-A-0480 00 KAIG3-RFI-SW-A-0480-00
KAIG3-RFI-SW-A-0479 00 KAIG3-RFI-SW-A-0479-00
KAIG3-RFI-TB-S-3848 00 KAIG3-RFI-TB-S-3848-00
KAIG3-RFI-MB-A-0478 00 KAIG3-RFI-MB-A-0478-00
KAIG3-RFI-MB-A-0477 00 KAIG3-RFI-MB-A-0477-00
KAIG3-RFI-WG-SU-1497 00 KAIG3-RFI-WG-SU-1497-00
KAIG3-RFI-SW-A-0481 00 KAIG3-RFI-SW-A-0481-00
KAIG3-RFI-SW-A-0424 01 KAIG3-RFI-SW-A-0424-01
KAIG3-RFI-CO-S-3851 00 KAIG3-RFI-CO-S-3851-00
KAIG3-RFI-CO-S-3850 00 KAIG3-RFI-CO-S-3850-00
KAIG3-RFI-CO-S-3847 00 KAIG3-RFI-CO-S-3847-00
KAIG3-RFI-CO-S-3846 00 KAIG3-RFI-CO-S-3846-00
KAIG3-RFI-CO-S-3845 00 KAIG3-RFI-CO-S-3845-00
KAIG3-RFI-SW-A-0471 01 KAIG3-RFI-SW-A-0471-01
KAIG3-RFI-CO-S-3844 00 KAIG3-RFI-CO-S-3844-00
KAIG3-RFI-CO-S-3843 00 KAIG3-RFI-CO-S-3843-00
KAIG3-RFI-CO-S-3842 00 KAIG3-RFI-CO-S-3842-00
KAIG3-RFI-SW-C-0262 00 KAIG3-RFI-SW-C-0262-00
KAIG3-RFI-SW-C-0261 00 KAIG3-RFI-SW-C-0261-00
KAIG3-RFI-SW-C-0256 00 KAIG3-RFI-SW-C-0256-00
KAIG3-RFI-SW-C-0254 00 KAIG3-RFI-SW-C-0254-00
KAIG3-RFI-SW-C-0253 00 KAIG3-RFI-SW-C-0253-00
KAIG3-RFI-SW-C-0252 00 KAIG3-RFI-SW-C-0252-00
KAIG3-RFI-CO-S-0441 00 KAIG3-RFI-CO-S-0441-00
KAIG3-RFI-CO-S-0356 00 KAIG3-RFI-CO-S-0356-00
KAIG3-RFI-CO-S-0329 00 KAIG3-RFI-CO-S-0329-00
KAIG3-RFI-SW-C-0259 00 KAIG3-RFI-SW-C-0259-00
KAIG3-RFI-SW-C-0257 00 KAIG3-RFI-SW-C-0257-00
KAIG3-RFI-SW-C-0255 00 KAIG3-RFI-SW-C-0255-00
KAIG3-RFI-SW-C-0251 00 KAIG3-RFI-SW-C-0251-00
KAIG3-RFI-SG-S-3839 00 KAIG3-RFI-SG-S-3839-00
KAIG3-RFI-SW-C-0250 00 KAIG3-RFI-SW-C-0250-00
KAIG3-RFI-WG-S-3838 00 KAIG3-RFI-WG-S-3838-00
KAIG3-RFI-WG-S-3837 00 KAIG3-RFI-WG-S-3837-00
KAIG3-RFI-WG-S-3836 00 KAIG3-RFI-WG-S-3836-00
KAIG3-RFI-SG-S-3835 00 KAIG3-RFI-SG-S-3835-00
KAIG3-RFI-WG-S-3833 00 KAIG3-RFI-WG-S-3833-00
KAIG3-RFI-AG-S-3832 00 KAIG3-RFI-AG-S-3832-00
KAIG3-RFI-AG-SU-1496 00 KAIG3-RFI-AG-SU-1496-00
KAIG3-RFI-SW-C-0238 01 KAIG3-RFI-SW-C-0238-01
KAIG3-RFI-SW-S-3834 00 KAIG3-RFI-SW-S-3834-00
KAIG3-RFI-SW-LS-0446 00 KAIG3-RFI-SW-LS-0446-00
KAIG3-RFI-SW-LS-0445 00 KAIG3-RFI-SW-LS-0445-00
KAIG3-RFI-SW-LS-0444 00 KAIG3-RFI-SW-LS-0444-00
KAIG3-RFI-SW-LS-0443 00 KAIG3-RFI-SW-LS-0443-00
KAIG3-RFI-SW-LS-0441 00 KAIG3-RFI-SW-LS-0441-00
KAIG3-RFI-CO-S-3841 00 KAIG3-RFI-CO-S-3841-00
KAIG3-RFI-CO-S-3840 00 KAIG3-RFI-CO-S-3840-00
KAIG3-RFI-CO-S-3831 00 KAIG3-RFI-CO-S-3831-00
KAIG3-RFI-CO-S-3830 00 KAIG3-RFI-CO-S-3830-00
KAIG3-RFI-CO-S-3829 00 KAIG3-RFI-CO-S-3829-00
KAIG3-RFI-CO-S-3812 00 KAIG3-RFI-CO-S-3812-00
KAIG3-RFI-CO-S-3811 00 KAIG3-RFI-CO-S-3811-00
KAIG3-RFI-MB-E-0181 00 KAIG3-RFI-MB-E-0181-00
KAIG3-RFI-TB-S-3826 00 KAIG3-RFI-TB-S-3826-00
KAIG3-RFI-MB-E-0195 00 KAIG3-RFI-MB-E-0195-00
KAIG3-RFI-TB-S-3825 00 KAIG3-RFI-TB-S-3825-00
KAIG3-RFI-TB-S-3824 00 KAIG3-RFI-TB-S-3824-00
KAIG3-RFI-WG-C-0249 00 KAIG3-RFI-WG-C-0249-00
KAIG3-RFI-WG-C-0248 00 KAIG3-RFI-WG-C-0248-00
KAIG3-RFI-SW-S-3823 00 KAIG3-RFI-SW-S-3823-00
KAIG3-RFI-SW-S-3822 00 KAIG3-RFI-SW-S-3822-00
KAIG3-RFI-SW-S-3821 00 KAIG3-RFI-SW-S-3821-00
KAIG3-RFI-SW-LS-0440 00 KAIG3-RFI-SW-LS-0440-00
KAIG3-RFI-SG-SU-1495 00 KAIG3-RFI-SG-SU-1495-00
KAIG3-RFI-SG-C-0246 00 KAIG3-RFI-SG-C-0246-00
KAIG3-RFI-WG-S-3820 00 KAIG3-RFI-WG-S-3820-00
KAIG3-RFI-WG-SU-1494 00 KAIG3-RFI-WG-SU-1494-00
KAIG3-RFI-WG-S-3818 00 KAIG3-RFI-WG-S-3818-00
KAIG3-RFI-WG-S-3817 00 KAIG3-RFI-WG-S-3817-00
KAIG3-RFI-WG-S-3816 00 KAIG3-RFI-WG-S-3816-00
KAIG3-RFI-WG-S-3815 00 KAIG3-RFI-WG-S-3815-00
KAIG3-RFI-WG-S-3814 00 KAIG3-RFI-WG-S-3814-00
KAIG3-RFI-SW-A-0476 00 KAIG3-RFI-SW-A-0476-00
KAIG3-RFI-PG-LS-0442 00 KAIG3-RFI-PG-LS-0442-00
KAIG3-RFI-WG-S-3798 00 KAIG3-RFI-WG-S-3798-00
KAIG3-RFI-TB-SU-1420 02 KAIG3-RFI-TB-SU-1420-02
KAIG3-RFI-CO-S-3828 00 KAIG3-RFI-CO-S-3828-00
KAIG3-RFI-CO-S-3827 00 KAIG3-RFI-CO-S-3827-00
KAIG3-RFI-CO-S-3810 00 KAIG3-RFI-CO-S-3810-00
KAIG3-RFI-CO-S-3809 00 KAIG3-RFI-CO-S-3809-00
KAIG3-RFI-CO-SU-1492 00 KAIG3-RFI-CO-SU-1492-00
KAIG3-RFI-CO-SU-1371 01 KAIG3-RFI-CO-SU-1371-01
KAIG3-RFI-CO-SU-1356 01 KAIG3-RFI-CO-SU-1356-01
KAIG3-RFI-CO-SU-1333 01 KAIG3-RFI-CO-SU-1333-01
KAIG3-RFI-CO-SU-1491 00 KAIG3-RFI-CO-SU-1491-00
KAIG3-RFI-CO-SU-1297 01 KAIG3-RFI-CO-SU-1297-01
KAIG3-RFI-CO-SU-1283 01 KAIG3-RFI-CO-SU-1283-01
KAIG3-RFI-CO-S-3808 00 KAIG3-RFI-CO-S-3808-00
KAIG3-RFI-SG-E-0194 00 KAIG3-RFI-SG-E-0194-00
KAIG3-RFI-SW-LS-0439 00 KAIG3-RFI-SW-LS-0439-00
KAIG3-RFI-PA-S-3803 00 KAIG3-RFI-PA-S-3803-00
KAIG3-RFI-PA-S-3804 00 KAIG3-RFI-PA-S-3804-00
KAIG3-RFI-CO-S-3807 00 KAIG3-RFI-CO-S-3807-00
KAIG3-RFI-CO-S-3806 00 KAIG3-RFI-CO-S-3806-00
KAIG3-RFI-CO-S-3805 00 KAIG3-RFI-CO-S-3805-00
KAIG3-RFI-CO-S-3178 01 KAIG3-RFI-CO-S-3178-01
KAIG3-RFI-CO-S-3071 01 KAIG3-RFI-CO-S-3071-01
KAIG3-RFI-CO-S-3069 01 KAIG3-RFI-CO-S-3069-01
KAIG3-RFI-CO-S-0770 01 KAIG3-RFI-CO-S-0770-01
KAIG3-RFI-CO-S-0982 01 KAIG3-RFI-CO-S-0982-01
KAIG3-RFI-SW-C-0245 00 KAIG3-RFI-SW-C-0245-00
KAIG3-RFI-SW-C-0244 00 KAIG3-RFI-SW-C-0244-00
KAIG3-RFI-CO-S-3726 01 KAIG3-RFI-CO-S-3726-01
KAIG3-RFI-SW-C-0243 00 KAIG3-RFI-SW-C-0243-00
KAIG3-RFI-SW-C-0242 00 KAIG3-RFI-SW-C-0242-00
KAIG3-RFI-SW-C-0241 00 KAIG3-RFI-SW-C-0241-00
KAIG3-RFI-CO-S-3725 01 KAIG3-RFI-CO-S-3725-01
KAIG3-RFI-CO-S-3724 01 KAIG3-RFI-CO-S-3724-01
KAIG3-RFI-SW-C-0240 00 KAIG3-RFI-SW-C-0240-00
KAIG3-RFI-SW-LS-0437 00 KAIG3-RFI-SW-LS-0437-00
KAIG3-RFI-SW-LS-0435 00 KAIG3-RFI-SW-LS-0435-00
KAIG3-RFI-SW-LS-0436 00 KAIG3-RFI-SW-LS-0436-00
KAIG3-RFI-SW-LS-0438 00 KAIG3-RFI-SW-LS-0438-00
KAIG3-RFI-WG-S-3797 00 KAIG3-RFI-WG-S-3797-00
KAIG3-RFI-MB-A-0465 01 KAIG3-RFI-MB-A-0465-01
KAIG3-RFI-WG-S-3796 00 KAIG3-RFI-WG-S-3796-00
KAIG3-RFI-WG-SU-1489 00 KAIG3-RFI-WG-SU-1489-00
KAIG3-RFI-SW-A-0464 01 KAIG3-RFI-SW-A-0464-01
KAIG3-RFI-WG-LS-0434 00 KAIG3-RFI-WG-LS-0434-00
KAIG3-RFI-CO-S-3802 00 KAIG3-RFI-CO-S-3802-00
KAIG3-RFI-CO-S-3801 00 KAIG3-RFI-CO-S-3801-00
KAIG3-RFI-CO-S-3800 00 KAIG3-RFI-CO-S-3800-00
KAIG3-RFI-CO-SU-1490 00 KAIG3-RFI-CO-SU-1490-00
KAIG3-RFI-CO-S-3799 00 KAIG3-RFI-CO-S-3799-00
KAIG3-RFI-CO-S-3792 00 KAIG3-RFI-CO-S-3792-00
KAIG3-RFI-CO-S-3791 00 KAIG3-RFI-CO-S-3791-00
KAIG3-RFI-CO-LC-0176 00 KAIG3-RFI-CO-LC-0176-00
KAIG3-RFI-CO-S-3790 00 KAIG3-RFI-CO-S-3790-00
KAIG3-RFI-CO-LC-0175 00 KAIG3-RFI-CO-LC-0175-00
KAIG3-RFI-CO-S-3789 00 KAIG3-RFI-CO-S-3789-00
KAIG3-RFI-CO-LC-0174 00 KAIG3-RFI-CO-LC-0174-00
KAIG3-RFI-CO-S-3788 00 KAIG3-RFI-CO-S-3788-00
KAIG3-RFI-CO-S-3787 00 KAIG3-RFI-CO-S-3787-00
KAIG3-RFI-SG-LC-0173 00 KAIG3-RFI-SG-LC-0173-00
KAIG3-RFI-SG-LC-0172 00 KAIG3-RFI-SG-LC-0172-00
KAIG3-RFI-SG-LC-0171 00 KAIG3-RFI-SG-LC-0171-00
KAIG3-RFI-SG-E-0193 00 KAIG3-RFI-SG-E-0193-00
KAIG3-RFI-MB-M-0130 00 KAIG3-RFI-MB-M-0130-00
KAIG3-RFI-SW-C-0238 00 KAIG3-RFI-SW-C-0238-00
KAIG3-RFI-SW-LS-0433 00 KAIG3-RFI-SW-LS-0433-00
KAIG3-RFI-SW-LS-0432 00 KAIG3-RFI-SW-LS-0432-00
KAIG3-RFI-SW-LS-0431 00 KAIG3-RFI-SW-LS-0431-00
KAIG3-RFI-SW-LS-0430 00 KAIG3-RFI-SW-LS-0430-00
KAIG3-RFI-AG-S-3795 00 KAIG3-RFI-AG-S-3795-00
KAIG3-RFI-WG-SU-1488 00 KAIG3-RFI-WG-SU-1488-00
KAIG3-RFI-WG-C-0239 00 KAIG3-RFI-WG-C-0239-00
KAIG3-RFI-WG-S-3778 00 KAIG3-RFI-WG-S-3778-00
KAIG3-RFI-SG-S-3777 00 KAIG3-RFI-SG-S-3777-00
KAIG3-RFI-CO-SU-1487 00 KAIG3-RFI-CO-SU-1487-00
KAIG3-RFI-CO-SU-1486 00 KAIG3-RFI-CO-SU-1486-00
KAIG3-RFI-CO-S-3794 00 KAIG3-RFI-CO-S-3794-00
KAIG3-RFI-CO-S-3793 00 KAIG3-RFI-CO-S-3793-00
KAIG3-RFI-CO-S-3786 00 KAIG3-RFI-CO-S-3786-00
KAIG3-RFI-CO-S-3785 00 KAIG3-RFI-CO-S-3785-00
KAIG3-RFI-SG-SU-1484 00 KAIG3-RFI-SG-SU-1484-00
KAIG3-RFI-CO-S-3784 00 KAIG3-RFI-CO-S-3784-00
KAIG3-RFI-CO-S-3783 00 KAIG3-RFI-CO-S-3783-00
KAIG3-RFI-CO-S-3782 00 KAIG3-RFI-CO-S-3782-00
KAIG3-RFI-CO-S-3781 00 KAIG3-RFI-CO-S-3781-00
KAIG3-RFI-CO-S-3780 00 KAIG3-RFI-CO-S-3780-00
KAIG3-RFI-CO-S-3779 00 KAIG3-RFI-CO-S-3779-00
KAIG3-RFI-CO-S-3048 01 KAIG3-RFI-CO-S-3048-01
KAIG3-RFI-CO-S-2877 01 KAIG3-RFI-CO-S-2877-01
KAIG3-RFI-CO-S-2872 01 KAIG3-RFI-CO-S-2872-01
KAIG3-RFI-CO-S-2539 01 KAIG3-RFI-CO-S-2539-01
KAIG3-RFI-CO-S-2538 01 KAIG3-RFI-CO-S-2538-01
KAIG3-RFI-CO-S-3776 00 KAIG3-RFI-CO-S-3776-00
KAIG3-RFI-CO-S-3775 00 KAIG3-RFI-CO-S-3775-00
KAIG3-RFI-CO-S-3774 00 KAIG3-RFI-CO-S-3774-00
KAIG3-RFI-CO-S-3773 00 KAIG3-RFI-CO-S-3773-00
KAIG3-RFI-CO-S-3772 00 KAIG3-RFI-CO-S-3772-00
KAIG3-RFI-CO-S-3771 00 KAIG3-RFI-CO-S-3771-00
KAIG3-RFI-CO-S-3770 00 KAIG3-RFI-CO-S-3770-00
KAIG3-RFI-CO-S-3769 00 KAIG3-RFI-CO-S-3769-00
KAIG3-RFI-CO-S-3768 00 KAIG3-RFI-CO-S-3768-00
KAIG3-RFI-CO-S-3767 00 KAIG3-RFI-CO-S-3767-00
KAIG3-RFI-MB-E-0192 00 KAIG3-RFI-MB-E-0192-00
KAIG3-RFI-MB-E-0180 01 KAIG3-RFI-MB-E-0180-01
KAIG3-RFI-SW-LS-0429 00 KAIG3-RFI-SW-LS-0429-00
KAIG3-RFI-SW-LS-0428 00 KAIG3-RFI-SW-LS-0428-00
KAIG3-RFI-PA-C-0236 00 KAIG3-RFI-PA-C-0236-00
KAIG3-RFI-CO-SU-1485 00 KAIG3-RFI-CO-SU-1485-00
KAIG3-RFI-CO-S-3766 00 KAIG3-RFI-CO-S-3766-00
KAIG3-RFI-CO-S-3765 00 KAIG3-RFI-CO-S-3765-00
KAIG3-RFI-CO-S-3764 00 KAIG3-RFI-CO-S-3764-00
KAIG3-RFI-CO-S-1919 01 KAIG3-RFI-CO-S-1919-01
KAIG3-RFI-CO-S-1186 01 KAIG3-RFI-CO-S-1186-01
KAIG3-RFI-CO-S-1185 01 KAIG3-RFI-CO-S-1185-01
KAIG3-RFI-CO-S-0519 01 KAIG3-RFI-CO-S-0519-01
KAIG3-RFI-CO-S-0515 01 KAIG3-RFI-CO-S-0515-01
KAIG3-RFI-CO-SU-1482 00 KAIG3-RFI-CO-SU-1482-00
KAIG3-RFI-SG-S-3763 00 KAIG3-RFI-SG-S-3763-00
KAIG3-RFI-SG-S-3762 00 KAIG3-RFI-SG-S-3762-00
KAIG3-RFI-SG-S-3761 00 KAIG3-RFI-SG-S-3761-00
KAIG3-RFI-SG-S-3760 00 KAIG3-RFI-SG-S-3760-00
KAIG3-RFI-MB-SU-1483 00 KAIG3-RFI-MB-SU-1483-00
KAIG3-RFI-MB-S-3759 00 KAIG3-RFI-MB-S-3759-00
KAIG3-RFI-MB-S-3758 00 KAIG3-RFI-MB-S-3758-00
KAIG3-RFI-WG-C-0237 00 KAIG3-RFI-WG-C-0237-00
KAIG3-RFI-WG-SU-1475 00 KAIG3-RFI-WG-SU-1475-00
KAIG3-RFI-SW-LS-0420 00 KAIG3-RFI-SW-LS-0420-00
KAIG3-RFI-SW-LS-0427 00 KAIG3-RFI-SW-LS-0427-00
KAIG3-RFI-SW-C-0234 00 KAIG3-RFI-SW-C-0234-00
KAIG3-RFI-SW-C-0233 00 KAIG3-RFI-SW-C-0233-00
KAIG3-RFI-SW-C-0232 00 KAIG3-RFI-SW-C-0232-00
KAIG3-RFI-SW-C-0231 00 KAIG3-RFI-SW-C-0231-00
KAIG3-RFI-SW-C-0230 00 KAIG3-RFI-SW-C-0230-00
KAIG3-RFI-SW-C-0229 00 KAIG3-RFI-SW-C-0229-00
KAIG3-RFI-SW-C-0228 00 KAIG3-RFI-SW-C-0228-00
KAIG3-RFI-SW-C-0227 00 KAIG3-RFI-SW-C-0227-00
KAIG3-RFI-SW-A-0463 01 KAIG3-RFI-SW-A-0463-01
KAIG3-RFI-SW-A-0462 01 KAIG3-RFI-SW-A-0462-01
KAIG3-RFI-SG-S-3756 00 KAIG3-RFI-SG-S-3756-00
KAIG3-RFI-SG-S-3755 00 KAIG3-RFI-SG-S-3755-00
KAIG3-RFI-SG-S-3754 00 KAIG3-RFI-SG-S-3754-00
KAIG3-RFI-SG-S-3753 00 KAIG3-RFI-SG-S-3753-00
KAIG3-RFI-SW-A-0467 00 KAIG3-RFI-SW-A-0467-00
KAIG3-RFI-CO-S-3757 00 KAIG3-RFI-CO-S-3757-00
KAIG3-RFI-CO-S-3752 00 KAIG3-RFI-CO-S-3752-00
KAIG3-RFI-CO-S-3751 00 KAIG3-RFI-CO-S-3751-00
KAIG3-RFI-CO-S-3703 00 KAIG3-RFI-CO-S-3703-00
KAIG3-RFI-SW-LS-0425 00 KAIG3-RFI-SW-LS-0425-00
KAIG3-RFI-SW-LS-0424 00 KAIG3-RFI-SW-LS-0424-00
KAIG3-RFI-SW-LS-0423 00 KAIG3-RFI-SW-LS-0423-00
KAIG3-RFI-SW-LS-0422 00 KAIG3-RFI-SW-LS-0422-00
KAIG3-RFI-SW-LS-0421 00 KAIG3-RFI-SW-LS-0421-00
KAIG3-RFI-CO-SU-1481 00 KAIG3-RFI-CO-SU-1481-00
KAIG3-RFI-CO-SU-1480 00 KAIG3-RFI-CO-SU-1480-00
KAIG3-RFI-CO-S-3750 00 KAIG3-RFI-CO-S-3750-00
KAIG3-RFI-CO-S-3749 00 KAIG3-RFI-CO-S-3749-00
KAIG3-RFI-CO-S-3748 00 KAIG3-RFI-CO-S-3748-00
KAIG3-RFI-CO-S-3747 00 KAIG3-RFI-CO-S-3747-00
KAIG3-RFI-CO-S-3746 00 KAIG3-RFI-CO-S-3746-00
KAIG3-RFI-CO-S-3745 00 KAIG3-RFI-CO-S-3745-00
KAIG3-RFI-CO-S-3744 00 KAIG3-RFI-CO-S-3744-00
KAIG3-RFI-CO-S-3743 00 KAIG3-RFI-CO-S-3743-00
KAIG3-RFI-CO-S-3742 00 KAIG3-RFI-CO-S-3742-00
KAIG3-RFI-CO-S-3741 00 KAIG3-RFI-CO-S-3741-00
KAIG3-RFI-CO-S-3740 00 KAIG3-RFI-CO-S-3740-00
KAIG3-RFI-CO-S-3739 00 KAIG3-RFI-CO-S-3739-00
KAIG3-RFI-WG-LS-0426 00 KAIG3-RFI-WG-LS-0426-00
KAIG3-RFI-WG-S-3738 00 KAIG3-RFI-WG-S-3738-00
KAIG3-RFI-WG-S-3737 00 KAIG3-RFI-WG-S-3737-00
KAIG3-RFI-WG-S-3736 00 KAIG3-RFI-WG-S-3736-00
KAIG3-RFI-WG-SU-1479 00 KAIG3-RFI-WG-SU-1479-00
KAIG3-RFI-WG-S-3735 00 KAIG3-RFI-WG-S-3735-00
KAIG3-RFI-WG-SU-1478 00 KAIG3-RFI-WG-SU-1478-00
KAIG3-RFI-WG-S-3734 00 KAIG3-RFI-WG-S-3734-00
KAIG3-RFI-WG-SU-1477 00 KAIG3-RFI-WG-SU-1477-00
KAIG3-RFI-MB-P-0129 00 KAIG3-RFI-MB-P-0129-00
KAIG3-RFI-MB-M-0128 00 KAIG3-RFI-MB-M-0128-00
KAIG3-RFI-MB-E-0186 01 KAIG3-RFI-MB-E-0186-01
KAIG3-RFI-CO-S-3615 00 KAIG3-RFI-CO-S-3615-00
KAIG3-RFI-CO-S-3725 00 KAIG3-RFI-CO-S-3725-00
KAIG3-RFI-TB-S-3733 00 KAIG3-RFI-TB-S-3733-00
KAIG3-RFI-SW-S-3732 00 KAIG3-RFI-SW-S-3732-00
KAIG3-RFI-AG-S-3731 00 KAIG3-RFI-AG-S-3731-00
KAIG3-RFI-AG-SU-1476 00 KAIG3-RFI-AG-SU-1476-00
KAIG3-RFI-WG-S-3730 00 KAIG3-RFI-WG-S-3730-00
KAIG3-RFI-SG-S-3719 00 KAIG3-RFI-SG-S-3719-00
KAIG3-RFI-SG-SU-1474 00 KAIG3-RFI-SG-SU-1474-00
KAIG3-RFI-SG-C-0226 00 KAIG3-RFI-SG-C-0226-00
KAIG3-RFI-SW-LS-0419 00 KAIG3-RFI-SW-LS-0419-00
KAIG3-RFI-SW-LS-0418 00 KAIG3-RFI-SW-LS-0418-00
KAIG3-RFI-SW-LS-0417 00 KAIG3-RFI-SW-LS-0417-00
KAIG3-RFI-PA-S-3729 00 KAIG3-RFI-PA-S-3729-00
KAIG3-RFI-SW-LS-0411 00 KAIG3-RFI-SW-LS-0411-00
KAIG3-RFI-SW-C-0148 01 KAIG3-RFI-SW-C-0148-01
KAIG3-RFI-PA-S-3459 01 KAIG3-RFI-PA-S-3459-01
KAIG3-RFI-PA-S-3458 01 KAIG3-RFI-PA-S-3458-01
KAIG3-RFI-PA-S-3456 01 KAIG3-RFI-PA-S-3456-01
KAIG3-RFI-SW-LS-0415 00 KAIG3-RFI-SW-LS-0415-00
KAIG3-RFI-PA-S-3720 00 KAIG3-RFI-PA-S-3720-00
KAIG3-RFI-PA-S-3712 00 KAIG3-RFI-PA-S-3712-00
KAIG3-RFI-PA-S-3711 00 KAIG3-RFI-PA-S-3711-00
KAIG3-RFI-CO-S-3728 00 KAIG3-RFI-CO-S-3728-00
KAIG3-RFI-CO-S-3727 00 KAIG3-RFI-CO-S-3727-00
KAIG3-RFI-CO-S-3726 00 KAIG3-RFI-CO-S-3726-00
KAIG3-RFI-CO-S-3724 00 KAIG3-RFI-CO-S-3724-00
KAIG3-RFI-CO-S-3723 00 KAIG3-RFI-CO-S-3723-00
KAIG3-RFI-CO-S-3722 00 KAIG3-RFI-CO-S-3722-00
KAIG3-RFI-CO-S-3721 00 KAIG3-RFI-CO-S-3721-00
KAIG3-RFI-PG-LS-0416 00 KAIG3-RFI-PG-LS-0416-00
KAIG3-RFI-WG-C-0224 00 KAIG3-RFI-WG-C-0224-00
KAIG3-RFI-WG-A-0466 00 KAIG3-RFI-WG-A-0466-00
KAIG3-RFI-WG-S-3718 00 KAIG3-RFI-WG-S-3718-00
KAIG3-RFI-WG-S-3717 00 KAIG3-RFI-WG-S-3717-00
KAIG3-RFI-SG-S-3716 00 KAIG3-RFI-SG-S-3716-00
KAIG3-RFI-SG-S-3715 00 KAIG3-RFI-SG-S-3715-00
KAIG3-RFI-SG-S-3714 00 KAIG3-RFI-SG-S-3714-00
KAIG3-RFI-SW-S-3713 00 KAIG3-RFI-SW-S-3713-00
KAIG3-RFI-SW-C-0225 00 KAIG3-RFI-SW-C-0225-00
KAIG3-RFI-CO-S-3704 00 KAIG3-RFI-CO-S-3704-00
KAIG3-RFI-WG-SU-1473 00 KAIG3-RFI-WG-SU-1473-00
KAIG3-RFI-WG-S-3701 00 KAIG3-RFI-WG-S-3701-00
KAIG3-RFI-SW-LS-0412 00 KAIG3-RFI-SW-LS-0412-00
KAIG3-RFI-WG-S-3700 00 KAIG3-RFI-WG-S-3700-00
KAIG3-RFI-SW-LS-0413 00 KAIG3-RFI-SW-LS-0413-00
KAIG3-RFI-SG-S-3699 00 KAIG3-RFI-SG-S-3699-00
KAIG3-RFI-SG-S-3698 00 KAIG3-RFI-SG-S-3698-00
KAIG3-RFI-PA-S-3696 00 KAIG3-RFI-PA-S-3696-00
KAIG3-RFI-SW-S-3695 00 KAIG3-RFI-SW-S-3695-00
KAIG3-RFI-PA-S-3694 00 KAIG3-RFI-PA-S-3694-00
KAIG3-RFI-PA-S-3693 00 KAIG3-RFI-PA-S-3693-00
KAIG3-RFI-PA-S-3692 00 KAIG3-RFI-PA-S-3692-00
KAIG3-RFI-SW-S-3597 00 KAIG3-RFI-SW-S-3597-00
KAIG3-RFI-PA-S-3691 00 KAIG3-RFI-PA-S-3691-00
KAIG3-RFI-SG-S-3697 00 KAIG3-RFI-SG-S-3697-00
KAIG3-RFI-WG-LS-0414 00 KAIG3-RFI-WG-LS-0414-00
KAIG3-RFI-SW-S-3690 00 KAIG3-RFI-SW-S-3690-00
KAIG3-RFI-SW-S-3689 00 KAIG3-RFI-SW-S-3689-00
KAIG3-RFI-SW-S-3688 00 KAIG3-RFI-SW-S-3688-00
KAIG3-RFI-SW-S-3584 00 KAIG3-RFI-SW-S-3584-00
KAIG3-RFI-CO-S-3710 00 KAIG3-RFI-CO-S-3710-00
KAIG3-RFI-CO-S-3709 00 KAIG3-RFI-CO-S-3709-00
KAIG3-RFI-CO-S-3637 00 KAIG3-RFI-CO-S-3637-00
KAIG3-RFI-CO-S-3708 00 KAIG3-RFI-CO-S-3708-00
KAIG3-RFI-CO-S-3707 00 KAIG3-RFI-CO-S-3707-00
KAIG3-RFI-CO-S-3706 00 KAIG3-RFI-CO-S-3706-00
KAIG3-RFI-CO-S-3705 00 KAIG3-RFI-CO-S-3705-00
KAIG3-RFI-CO-S-3702 00 KAIG3-RFI-CO-S-3702-00
KAIG3-RFI-SW-C-0223 00 KAIG3-RFI-SW-C-0223-00
KAIG3-RFI-CO-E-0191 00 KAIG3-RFI-CO-E-0191-00
KAIG3-RFI-CO-E-0190 00 KAIG3-RFI-CO-E-0190-00
KAIG3-RFI-CO-E-0189 00 KAIG3-RFI-CO-E-0189-00
KAIG3-RFI-CO-LC-0170 00 KAIG3-RFI-CO-LC-0170-00
KAIG3-RFI-CO-LC-0169 00 KAIG3-RFI-CO-LC-0169-00
KAIG3-RFI-CO-LC-0168 00 KAIG3-RFI-CO-LC-0168-00
KAIG3-RFI-AG-S-3685 00 KAIG3-RFI-AG-S-3685-00
KAIG3-RFI-CO-SU-1472 00 KAIG3-RFI-CO-SU-1472-00
KAIG3-RFI-CO-SU-1471 00 KAIG3-RFI-CO-SU-1471-00
KAIG3-RFI-CO-SU-1468 00 KAIG3-RFI-CO-SU-1468-00
KAIG3-RFI-CO-S-3687 00 KAIG3-RFI-CO-S-3687-00
KAIG3-RFI-CO-S-3686 00 KAIG3-RFI-CO-S-3686-00
KAIG3-RFI-CO-S-3684 00 KAIG3-RFI-CO-S-3684-00
KAIG3-RFI-CO-S-3683 00 KAIG3-RFI-CO-S-3683-00
KAIG3-RFI-CO-S-3678 00 KAIG3-RFI-CO-S-3678-00
KAIG3-RFI-CO-S-3677 00 KAIG3-RFI-CO-S-3677-00
KAIG3-RFI-CO-S-3676 00 KAIG3-RFI-CO-S-3676-00
KAIG3-RFI-CO-S-3675 00 KAIG3-RFI-CO-S-3675-00
KAIG3-RFI-CO-S-3674 00 KAIG3-RFI-CO-S-3674-00
KAIG3-RFI-CO-S-3673 00 KAIG3-RFI-CO-S-3673-00
KAIG3-RFI-SW-LS-0410 00 KAIG3-RFI-SW-LS-0410-00
KAIG3-RFI-SW-LS-0409 00 KAIG3-RFI-SW-LS-0409-00
KAIG3-RFI-SW-C-0222 00 KAIG3-RFI-SW-C-0222-00
KAIG3-RFI-SW-C-0221 00 KAIG3-RFI-SW-C-0221-00
KAIG3-RFI-SW-S-3682 00 KAIG3-RFI-SW-S-3682-00
KAIG3-RFI-SW-S-3681 00 KAIG3-RFI-SW-S-3681-00
KAIG3-RFI-SW-S-3680 00 KAIG3-RFI-SW-S-3680-00
KAIG3-RFI-PA-S-3679 00 KAIG3-RFI-PA-S-3679-00
KAIG3-RFI-SW-C-0220 00 KAIG3-RFI-SW-C-0220-00
KAIG3-RFI-SW-C-0219 00 KAIG3-RFI-SW-C-0219-00
KAIG3-RFI-SW-C-0218 00 KAIG3-RFI-SW-C-0218-00
KAIG3-RFI-SG-S-3670 00 KAIG3-RFI-SG-S-3670-00
KAIG3-RFI-WG-S-3669 00 KAIG3-RFI-WG-S-3669-00
KAIG3-RFI-WG-SU-1470 00 KAIG3-RFI-WG-SU-1470-00
KAIG3-RFI-WG-S-3668 00 KAIG3-RFI-WG-S-3668-00
KAIG3-RFI-WG-SU-1469 00 KAIG3-RFI-WG-SU-1469-00
KAIG3-RFI-MB-S-3667 00 KAIG3-RFI-MB-S-3667-00
KAIG3-RFI-MB-S-3666 00 KAIG3-RFI-MB-S-3666-00
KAIG3-RFI-MB-A-0475 00 KAIG3-RFI-MB-A-0475-00
KAIG3-RFI-MB-A-0474 00 KAIG3-RFI-MB-A-0474-00
KAIG3-RFI-SW-S-3648 00 KAIG3-RFI-SW-S-3648-00
KAIG3-RFI-PA-S-3649 00 KAIG3-RFI-PA-S-3649-00
KAIG3-RFI-PA-S-3647 00 KAIG3-RFI-PA-S-3647-00
KAIG3-RFI-PA-S-3646 00 KAIG3-RFI-PA-S-3646-00
KAIG3-RFI-PA-S-3645 00 KAIG3-RFI-PA-S-3645-00
KAIG3-RFI-PA-S-3644 00 KAIG3-RFI-PA-S-3644-00
KAIG3-RFI-SW-C-0217 00 KAIG3-RFI-SW-C-0217-00
KAIG3-RFI-SW-C-0216 00 KAIG3-RFI-SW-C-0216-00
KAIG3-RFI-SW-LS-0254 01 KAIG3-RFI-SW-LS-0254-01
KAIG3-RFI-SW-LS-0408 00 KAIG3-RFI-SW-LS-0408-00
KAIG3-RFI-PA-S-3641 00 KAIG3-RFI-PA-S-3641-00
KAIG3-RFI-CO-SU-1467 00 KAIG3-RFI-CO-SU-1467-00
KAIG3-RFI-CO-S-3664 00 KAIG3-RFI-CO-S-3664-00
KAIG3-RFI-CO-S-3663 00 KAIG3-RFI-CO-S-3663-00
KAIG3-RFI-CO-S-3662 00 KAIG3-RFI-CO-S-3662-00
KAIG3-RFI-CO-S-3661 00 KAIG3-RFI-CO-S-3661-00
KAIG3-RFI-CO-S-3658 00 KAIG3-RFI-CO-S-3658-00
KAIG3-RFI-CO-S-3657 00 KAIG3-RFI-CO-S-3657-00
KAIG3-RFI-CO-S-3656 00 KAIG3-RFI-CO-S-3656-00
KAIG3-RFI-CO-S-3655 00 KAIG3-RFI-CO-S-3655-00
KAIG3-RFI-CO-S-3654 00 KAIG3-RFI-CO-S-3654-00
KAIG3-RFI-CO-S-3653 00 KAIG3-RFI-CO-S-3653-00
KAIG3-RFI-CO-S-3652 00 KAIG3-RFI-CO-S-3652-00
KAIG3-RFI-CO-S-3651 00 KAIG3-RFI-CO-S-3651-00
KAIG3-RFI-CO-S-3650 00 KAIG3-RFI-CO-S-3650-00
KAIG3-RFI-CO-S-2845 01 KAIG3-RFI-CO-S-2845-01
KAIG3-RFI-CO-S-3665 00 KAIG3-RFI-CO-S-3665-00
KAIG3-RFI-SW-LS-0350 01 KAIG3-RFI-SW-LS-0350-01
KAIG3-RFI-PA-S-3457 01 KAIG3-RFI-PA-S-3457-01
KAIG3-RFI-SW-C-0215 00 KAIG3-RFI-SW-C-0215-00
KAIG3-RFI-CO-SU-1465 00 KAIG3-RFI-CO-SU-1465-00
KAIG3-RFI-CO-SU-1464 00 KAIG3-RFI-CO-SU-1464-00
KAIG3-RFI-CO-S-3640 00 KAIG3-RFI-CO-S-3640-00
KAIG3-RFI-CO-S-3639 00 KAIG3-RFI-CO-S-3639-00
KAIG3-RFI-CO-S-3638 00 KAIG3-RFI-CO-S-3638-00
KAIG3-RFI-WG-S-3643 00 KAIG3-RFI-WG-S-3643-00
KAIG3-RFI-WG-SU-1466 00 KAIG3-RFI-WG-SU-1466-00
KAIG3-RFI-WG-S-3642 00 KAIG3-RFI-WG-S-3642-00
KAIG3-RFI-WG-SU-1461 00 KAIG3-RFI-WG-SU-1461-00
KAIG3-RFI-SG-S-3636 00 KAIG3-RFI-SG-S-3636-00
KAIG3-RFI-MB-A-0473 00 KAIG3-RFI-MB-A-0473-00
KAIG3-RFI-WG-S-3635 00 KAIG3-RFI-WG-S-3635-00
KAIG3-RFI-WG-S-3634 00 KAIG3-RFI-WG-S-3634-00
KAIG3-RFI-WG-SU-1463 00 KAIG3-RFI-WG-SU-1463-00
KAIG3-RFI-PG-A-0472 00 KAIG3-RFI-PG-A-0472-00
KAIG3-RFI-PG-LS-0407 00 KAIG3-RFI-PG-LS-0407-00
KAIG3-RFI-SW-A-0471 00 KAIG3-RFI-SW-A-0471-00
KAIG3-RFI-SW-A-0470 00 KAIG3-RFI-SW-A-0470-00
KAIG3-RFI-SW-A-0469 00 KAIG3-RFI-SW-A-0469-00
KAIG3-RFI-SW-A-0468 00 KAIG3-RFI-SW-A-0468-00
KAIG3-RFI-WG-S-3633 00 KAIG3-RFI-WG-S-3633-00
KAIG3-RFI-WG-S-3632 00 KAIG3-RFI-WG-S-3632-00
KAIG3-RFI-WG-S-3631 00 KAIG3-RFI-WG-S-3631-00
KAIG3-RFI-WG-LS-0405 00 KAIG3-RFI-WG-LS-0405-00
KAIG3-RFI-SW-LS-0402 00 KAIG3-RFI-SW-LS-0402-00
KAIG3-RFI-SW-S-3616 00 KAIG3-RFI-SW-S-3616-00
KAIG3-RFI-SW-LS-0406 00 KAIG3-RFI-SW-LS-0406-00
KAIG3-RFI-SG-C-0212 00 KAIG3-RFI-SG-C-0212-00
KAIG3-RFI-SG-C-0211 00 KAIG3-RFI-SG-C-0211-00
KAIG3-RFI-SG-SU-1120 02 KAIG3-RFI-SG-SU-1120-02
KAIG3-RFI-WG-S-3625 00 KAIG3-RFI-WG-S-3625-00
KAIG3-RFI-WG-SU-1460 00 KAIG3-RFI-WG-SU-1460-00
KAIG3-RFI-WG-S-3624 00 KAIG3-RFI-WG-S-3624-00
KAIG3-RFI-WG-S-3619 00 KAIG3-RFI-WG-S-3619-00
KAIG3-RFI-WG-S-3618 00 KAIG3-RFI-WG-S-3618-00
KAIG3-RFI-WG-S-3607 00 KAIG3-RFI-WG-S-3607-00
KAIG3-RFI-WG-SU-1455 00 KAIG3-RFI-WG-SU-1455-00
KAIG3-RFI-WG-S-3606 00 KAIG3-RFI-WG-S-3606-00
KAIG3-RFI-WG-S-3604 00 KAIG3-RFI-WG-S-3604-00
KAIG3-RFI-CO-SU-1462 00 KAIG3-RFI-CO-SU-1462-00
KAIG3-RFI-CO-S-3628 00 KAIG3-RFI-CO-S-3628-00
KAIG3-RFI-CO-S-3627 00 KAIG3-RFI-CO-S-3627-00
KAIG3-RFI-CO-S-3626 00 KAIG3-RFI-CO-S-3626-00
KAIG3-RFI-CO-S-3630 00 KAIG3-RFI-CO-S-3630-00
KAIG3-RFI-CO-S-3629 00 KAIG3-RFI-CO-S-3629-00
KAIG3-RFI-CO-S-3623 00 KAIG3-RFI-CO-S-3623-00
KAIG3-RFI-CO-S-3620 00 KAIG3-RFI-CO-S-3620-00
KAIG3-RFI-SW-C-0214 00 KAIG3-RFI-SW-C-0214-00
KAIG3-RFI-SW-C-0213 00 KAIG3-RFI-SW-C-0213-00
KAIG3-RFI-SW-C-0210 00 KAIG3-RFI-SW-C-0210-00
KAIG3-RFI-SW-C-0209 00 KAIG3-RFI-SW-C-0209-00
KAIG3-RFI-CO-SU-1459 00 KAIG3-RFI-CO-SU-1459-00
KAIG3-RFI-CO-S-3622 00 KAIG3-RFI-CO-S-3622-00
KAIG3-RFI-CO-S-3621 00 KAIG3-RFI-CO-S-3621-00
KAIG3-RFI-SW-S-3614 00 KAIG3-RFI-SW-S-3614-00
KAIG3-RFI-SW-LS-0404 00 KAIG3-RFI-SW-LS-0404-00
KAIG3-RFI-SW-LS-0403 00 KAIG3-RFI-SW-LS-0403-00
KAIG3-RFI-SW-LS-0401 00 KAIG3-RFI-SW-LS-0401-00
KAIG3-RFI-PA-S-3609 00 KAIG3-RFI-PA-S-3609-00
KAIG3-RFI-PA-S-3608 00 KAIG3-RFI-PA-S-3608-00
KAIG3-RFI-PA-S-3601 00 KAIG3-RFI-PA-S-3601-00
KAIG3-RFI-PA-S-3600 00 KAIG3-RFI-PA-S-3600-00
KAIG3-RFI-PA-S-3599 00 KAIG3-RFI-PA-S-3599-00
KAIG3-RFI-PA-S-3598 00 KAIG3-RFI-PA-S-3598-00
KAIG3-RFI-WG-S-3461 00 KAIG3-RFI-WG-S-3461-00
KAIG3-RFI-WG-S-3617 00 KAIG3-RFI-WG-S-3617-00
KAIG3-RFI-MB-A-0465 00 KAIG3-RFI-MB-A-0465-00
KAIG3-RFI-WG-S-3605 00 KAIG3-RFI-WG-S-3605-00
KAIG3-RFI-WG-SU-1454 00 KAIG3-RFI-WG-SU-1454-00
KAIG3-RFI-WG-S-3603 00 KAIG3-RFI-WG-S-3603-00
KAIG3-RFI-WG-SU-1453 00 KAIG3-RFI-WG-SU-1453-00
KAIG3-RFI-WG-S-3602 00 KAIG3-RFI-WG-S-3602-00
KAIG3-RFI-WG-SU-1452 00 KAIG3-RFI-WG-SU-1452-00
KAIG3-RFI-CO-S-3576 00 KAIG3-RFI-CO-S-3576-00
KAIG3-RFI-CO-S-3573 00 KAIG3-RFI-CO-S-3573-00
KAIG3-RFI-CO-S-3545 00 KAIG3-RFI-CO-S-3545-00
KAIG3-RFI-CO-S-3448 01 KAIG3-RFI-CO-S-3448-01
KAIG3-RFI-CO-S-3477 01 KAIG3-RFI-CO-S-3477-01
KAIG3-RFI-CO-S-3444 01 KAIG3-RFI-CO-S-3444-01
KAIG3-RFI-CO-SU-1458 00 KAIG3-RFI-CO-SU-1458-00
KAIG3-RFI-CO-SU-1457 00 KAIG3-RFI-CO-SU-1457-00
KAIG3-RFI-CO-S-3613 00 KAIG3-RFI-CO-S-3613-00
KAIG3-RFI-CO-SU-1456 00 KAIG3-RFI-CO-SU-1456-00
KAIG3-RFI-CO-S-3612 00 KAIG3-RFI-CO-S-3612-00
KAIG3-RFI-CO-S-3611 00 KAIG3-RFI-CO-S-3611-00
KAIG3-RFI-CO-S-3610 00 KAIG3-RFI-CO-S-3610-00
KAIG3-RFI-SW-C-0208 00 KAIG3-RFI-SW-C-0208-00
KAIG3-RFI-SW-C-0207 00 KAIG3-RFI-SW-C-0207-00
KAIG3-RFI-SW-C-0206 00 KAIG3-RFI-SW-C-0206-00
KAIG3-RFI-ZG-C-0205 00 KAIG3-RFI-ZG-C-0205-00
KAIG3-RFI-SW-LS-0371 01 KAIG3-RFI-SW-LS-0371-01
KAIG3-RFI-SW-LS-0351 01 KAIG3-RFI-SW-LS-0351-01
KAIG3-RFI-SW-LS-0400 00 KAIG3-RFI-SW-LS-0400-00
KAIG3-RFI-SW-LS-0399 00 KAIG3-RFI-SW-LS-0399-00
KAIG3-RFI-SW-LS-0398 00 KAIG3-RFI-SW-LS-0398-00
KAIG3-RFI-SW-LS-0397 00 KAIG3-RFI-SW-LS-0397-00
KAIG3-RFI-CO-S-3591 00 KAIG3-RFI-CO-S-3591-00
KAIG3-RFI-CO-SU-1451 00 KAIG3-RFI-CO-SU-1451-00
KAIG3-RFI-CO-S-3596 00 KAIG3-RFI-CO-S-3596-00
KAIG3-RFI-SW-LS-0396 00 KAIG3-RFI-SW-LS-0396-00
KAIG3-RFI-SW-LS-0395 00 KAIG3-RFI-SW-LS-0395-00
KAIG3-RFI-SW-LS-0394 00 KAIG3-RFI-SW-LS-0394-00
KAIG3-RFI-CO-S-3595 00 KAIG3-RFI-CO-S-3595-00
KAIG3-RFI-SW-LS-0393 00 KAIG3-RFI-SW-LS-0393-00
KAIG3-RFI-CO-S-3594 00 KAIG3-RFI-CO-S-3594-00
KAIG3-RFI-CO-S-3593 00 KAIG3-RFI-CO-S-3593-00
KAIG3-RFI-SW-LS-0392 00 KAIG3-RFI-SW-LS-0392-00
KAIG3-RFI-WG-S-3588 00 KAIG3-RFI-WG-S-3588-00
KAIG3-RFI-CO-S-3592 00 KAIG3-RFI-CO-S-3592-00
KAIG3-RFI-WG-S-3587 00 KAIG3-RFI-WG-S-3587-00
KAIG3-RFI-SW-LS-0391 00 KAIG3-RFI-SW-LS-0391-00
KAIG3-RFI-WG-S-3586 00 KAIG3-RFI-WG-S-3586-00
KAIG3-RFI-WG-S-3585 00 KAIG3-RFI-WG-S-3585-00
KAIG3-RFI-TB-SU-1449 00 KAIG3-RFI-TB-SU-1449-00
KAIG3-RFI-SW-LS-0390 00 KAIG3-RFI-SW-LS-0390-00
KAIG3-RFI-ZG-C-0203 00 KAIG3-RFI-ZG-C-0203-00
KAIG3-RFI-PG-C-0202 00 KAIG3-RFI-PG-C-0202-00
KAIG3-RFI-PA-S-3552 00 KAIG3-RFI-PA-S-3552-00
KAIG3-RFI-CO-S-3590 00 KAIG3-RFI-CO-S-3590-00
KAIG3-RFI-CO-S-3589 00 KAIG3-RFI-CO-S-3589-00
KAIG3-RFI-MB-E-0186 00 KAIG3-RFI-MB-E-0186-00
KAIG3-RFI-PG-C-0204 00 KAIG3-RFI-PG-C-0204-00
KAIG3-RFI-WG-S-3563 00 KAIG3-RFI-WG-S-3563-00
KAIG3-RFI-TB-S-3579 00 KAIG3-RFI-TB-S-3579-00
KAIG3-RFI-AG-S-3533 00 KAIG3-RFI-AG-S-3533-00
KAIG3-RFI-SW-A-0464 00 KAIG3-RFI-SW-A-0464-00
KAIG3-RFI-SW-A-0463 00 KAIG3-RFI-SW-A-0463-00
KAIG3-RFI-SW-A-0462 00 KAIG3-RFI-SW-A-0462-00
KAIG3-RFI-CO-SU-1450 00 KAIG3-RFI-CO-SU-1450-00
KAIG3-RFI-CO-S-3583 00 KAIG3-RFI-CO-S-3583-00
KAIG3-RFI-CO-S-3582 00 KAIG3-RFI-CO-S-3582-00
KAIG3-RFI-CO-S-3581 00 KAIG3-RFI-CO-S-3581-00
KAIG3-RFI-CO-S-3580 00 KAIG3-RFI-CO-S-3580-00
KAIG3-RFI-SW-C-0201 00 KAIG3-RFI-SW-C-0201-00
KAIG3-RFI-SW-C-0200 00 KAIG3-RFI-SW-C-0200-00
KAIG3-RFI-SW-C-0199 00 KAIG3-RFI-SW-C-0199-00
KAIG3-RFI-SW-C-0198 00 KAIG3-RFI-SW-C-0198-00
KAIG3-RFI-SW-C-0197 00 KAIG3-RFI-SW-C-0197-00
KAIG3-RFI-SW-LS-0389 00 KAIG3-RFI-SW-LS-0389-00
KAIG3-RFI-SW-LS-0388 00 KAIG3-RFI-SW-LS-0388-00
KAIG3-RFI-PA-S-3571 00 KAIG3-RFI-PA-S-3571-00
KAIG3-RFI-PA-S-3555 00 KAIG3-RFI-PA-S-3555-00
KAIG3-RFI-PA-S-3554 00 KAIG3-RFI-PA-S-3554-00
KAIG3-RFI-PA-S-3553 00 KAIG3-RFI-PA-S-3553-00
KAIG3-RFI-PA-S-3551 00 KAIG3-RFI-PA-S-3551-00
KAIG3-RFI-PA-S-3550 00 KAIG3-RFI-PA-S-3550-00
KAIG3-RFI-SW-LS-0387 00 KAIG3-RFI-SW-LS-0387-00
KAIG3-RFI-SW-LS-0386 00 KAIG3-RFI-SW-LS-0386-00
KAIG3-RFI-SW-LS-0385 00 KAIG3-RFI-SW-LS-0385-00
KAIG3-RFI-SW-LS-0384 00 KAIG3-RFI-SW-LS-0384-00
KAIG3-RFI-SW-LS-0383 00 KAIG3-RFI-SW-LS-0383-00
KAIG3-RFI-TB-S-3570 00 KAIG3-RFI-TB-S-3570-00
KAIG3-RFI-WG-S-3569 00 KAIG3-RFI-WG-S-3569-00
KAIG3-RFI-WG-S-3568 00 KAIG3-RFI-WG-S-3568-00
KAIG3-RFI-WG-S-3567 00 KAIG3-RFI-WG-S-3567-00
KAIG3-RFI-WG-S-3566 00 KAIG3-RFI-WG-S-3566-00
KAIG3-RFI-WG-S-3565 00 KAIG3-RFI-WG-S-3565-00
KAIG3-RFI-WG-S-3564 00 KAIG3-RFI-WG-S-3564-00
KAIG3-RFI-WG-SU-1446 00 KAIG3-RFI-WG-SU-1446-00
KAIG3-RFI-WG-S-3562 00 KAIG3-RFI-WG-S-3562-00
KAIG3-RFI-WG-C-0195 00 KAIG3-RFI-WG-C-0195-00
KAIG3-RFI-WG-A-0461 00 KAIG3-RFI-WG-A-0461-00
KAIG3-RFI-WG-S-3561 00 KAIG3-RFI-WG-S-3561-00
KAIG3-RFI-WG-S-3560 00 KAIG3-RFI-WG-S-3560-00
KAIG3-RFI-WG-S-3559 00 KAIG3-RFI-WG-S-3559-00
KAIG3-RFI-WG-S-3558 00 KAIG3-RFI-WG-S-3558-00
KAIG3-RFI-WG-S-3557 00 KAIG3-RFI-WG-S-3557-00
KAIG3-RFI-WG-S-3556 00 KAIG3-RFI-WG-S-3556-00
KAIG3-RFI-WG-S-3541 00 KAIG3-RFI-WG-S-3541-00
KAIG3-RFI-CO-S-3578 00 KAIG3-RFI-CO-S-3578-00
KAIG3-RFI-CO-S-3577 00 KAIG3-RFI-CO-S-3577-00
KAIG3-RFI-CO-S-3575 00 KAIG3-RFI-CO-S-3575-00
KAIG3-RFI-CO-S-3574 00 KAIG3-RFI-CO-S-3574-00
KAIG3-RFI-CO-SU-1448 00 KAIG3-RFI-CO-SU-1448-00
KAIG3-RFI-CO-SU-1447 00 KAIG3-RFI-CO-SU-1447-00
KAIG3-RFI-CO-S-3572 00 KAIG3-RFI-CO-S-3572-00
KAIG3-RFI-WG-S-3422 00 KAIG3-RFI-WG-S-3422-00
KAIG3-RFI-WG-S-3428 00 KAIG3-RFI-WG-S-3428-00
KAIG3-RFI-SW-C-0196 00 KAIG3-RFI-SW-C-0196-00
KAIG3-RFI-SW-C-0194 00 KAIG3-RFI-SW-C-0194-00
KAIG3-RFI-SW-C-0193 00 KAIG3-RFI-SW-C-0193-00
KAIG3-RFI-TB-E-0188 00 KAIG3-RFI-TB-E-0188-00
KAIG3-RFI-MB-S-3543 00 KAIG3-RFI-MB-S-3543-00
KAIG3-RFI-MB-S-3542 00 KAIG3-RFI-MB-S-3542-00
KAIG3-RFI-PG-C-0189 00 KAIG3-RFI-PG-C-0189-00
KAIG3-RFI-WG-S-3540 00 KAIG3-RFI-WG-S-3540-00
KAIG3-RFI-WG-S-3539 00 KAIG3-RFI-WG-S-3539-00
KAIG3-RFI-WG-S-3538 00 KAIG3-RFI-WG-S-3538-00
KAIG3-RFI-PA-S-3532 00 KAIG3-RFI-PA-S-3532-00
KAIG3-RFI-WG-S-3537 00 KAIG3-RFI-WG-S-3537-00
KAIG3-RFI-WG-S-3536 00 KAIG3-RFI-WG-S-3536-00
KAIG3-RFI-PA-S-3531 00 KAIG3-RFI-PA-S-3531-00
KAIG3-RFI-PA-S-3530 00 KAIG3-RFI-PA-S-3530-00
KAIG3-RFI-WG-S-3535 00 KAIG3-RFI-WG-S-3535-00
KAIG3-RFI-PA-S-3526 00 KAIG3-RFI-PA-S-3526-00
KAIG3-RFI-PA-S-3525 00 KAIG3-RFI-PA-S-3525-00
KAIG3-RFI-PA-S-3524 00 KAIG3-RFI-PA-S-3524-00
KAIG3-RFI-SW-S-3523 00 KAIG3-RFI-SW-S-3523-00
KAIG3-RFI-SW-S-3522 00 KAIG3-RFI-SW-S-3522-00
KAIG3-RFI-WG-S-3534 00 KAIG3-RFI-WG-S-3534-00
KAIG3-RFI-AG-SU-1443 00 KAIG3-RFI-AG-SU-1443-00
KAIG3-RFI-MB-E-0187 00 KAIG3-RFI-MB-E-0187-00
KAIG3-RFI-ZG-C-0188 00 KAIG3-RFI-ZG-C-0188-00
KAIG3-RFI-PG-C-0187 00 KAIG3-RFI-PG-C-0187-00
KAIG3-RFI-SW-S-3549 00 KAIG3-RFI-SW-S-3549-00
KAIG3-RFI-CO-S-3548 00 KAIG3-RFI-CO-S-3548-00
KAIG3-RFI-CO-S-3547 00 KAIG3-RFI-CO-S-3547-00
KAIG3-RFI-SW-C-0192 00 KAIG3-RFI-SW-C-0192-00
KAIG3-RFI-CO-SU-1441 00 KAIG3-RFI-CO-SU-1441-00
KAIG3-RFI-CO-S-3546 00 KAIG3-RFI-CO-S-3546-00
KAIG3-RFI-CO-SU-1445 00 KAIG3-RFI-CO-SU-1445-00
KAIG3-RFI-CO-SU-1444 00 KAIG3-RFI-CO-SU-1444-00
KAIG3-RFI-CO-S-3544 00 KAIG3-RFI-CO-S-3544-00
KAIG3-RFI-CO-S-3200 01 KAIG3-RFI-CO-S-3200-01
KAIG3-RFI-SW-C-0191 00 KAIG3-RFI-SW-C-0191-00
KAIG3-RFI-SW-C-0190 00 KAIG3-RFI-SW-C-0190-00
KAIG3-RFI-SW-C-0186 00 KAIG3-RFI-SW-C-0186-00
KAIG3-RFI-SW-C-0185 00 KAIG3-RFI-SW-C-0185-00
KAIG3-RFI-SW-C-0184 00 KAIG3-RFI-SW-C-0184-00
KAIG3-RFI-PG-C-0183 00 KAIG3-RFI-PG-C-0183-00
KAIG3-RFI-WG-S-3521 00 KAIG3-RFI-WG-S-3521-00
KAIG3-RFI-WG-S-3520 00 KAIG3-RFI-WG-S-3520-00
KAIG3-RFI-SW-A-0460 00 KAIG3-RFI-SW-A-0460-00
KAIG3-RFI-SW-A-0459 00 KAIG3-RFI-SW-A-0459-00
KAIG3-RFI-SW-A-0458 00 KAIG3-RFI-SW-A-0458-00
KAIG3-RFI-SW-A-0457 00 KAIG3-RFI-SW-A-0457-00
KAIG3-RFI-SW-A-0456 00 KAIG3-RFI-SW-A-0456-00
KAIG3-RFI-WG-S-3519 00 KAIG3-RFI-WG-S-3519-00
KAIG3-RFI-WG-S-3518 00 KAIG3-RFI-WG-S-3518-00
KAIG3-RFI-WG-S-3517 00 KAIG3-RFI-WG-S-3517-00
KAIG3-RFI-PG-C-0181-00 00 KAIG3-RFI-PG-C-0181-00-00
KAIG3-RFI-CO-S-3529 00 KAIG3-RFI-CO-S-3529-00
KAIG3-RFI-CO-S-3528 00 KAIG3-RFI-CO-S-3528-00
KAIG3-RFI-CO-S-3527 00 KAIG3-RFI-CO-S-3527-00
KAIG3-RFI-CO-SU-1442 00 KAIG3-RFI-CO-SU-1442-00
KAIG3-RFI-SW-LS-0382 00 KAIG3-RFI-SW-LS-0382-00
KAIG3-RFI-SW-LS-0381 00 KAIG3-RFI-SW-LS-0381-00
KAIG3-RFI-SW-S-3499 00 KAIG3-RFI-SW-S-3499-00
KAIG3-RFI-PG-C-0182 00 KAIG3-RFI-PG-C-0182-00
KAIG3-RFI-SW-S-3516 00 KAIG3-RFI-SW-S-3516-00
KAIG3-RFI-SW-S-3515 00 KAIG3-RFI-SW-S-3515-00
KAIG3-RFI-AG-S-3435 01 KAIG3-RFI-AG-S-3435-01
KAIG3-RFI-WG-C-0180 00 KAIG3-RFI-WG-C-0180-00
KAIG3-RFI-WG-SU-1434 00 KAIG3-RFI-WG-SU-1434-00
KAIG3-RFI-WG-S-3503 00 KAIG3-RFI-WG-S-3503-00
KAIG3-RFI-WG-LS-0226 02 KAIG3-RFI-WG-LS-0226-02
KAIG3-RFI-WG-S-3502 00 KAIG3-RFI-WG-S-3502-00
KAIG3-RFI-WG-S-3501 00 KAIG3-RFI-WG-S-3501-00
KAIG3-RFI-WG-S-3500 00 KAIG3-RFI-WG-S-3500-00
KAIG3-RFI-WG-C-0143 01 KAIG3-RFI-WG-C-0143-01
KAIG3-RFI-WG-S-3460 00 KAIG3-RFI-WG-S-3460-00
KAIG3-RFI-WG-SU-1414 01 KAIG3-RFI-WG-SU-1414-01
KAIG3-RFI-SW-LS-0380 00 KAIG3-RFI-SW-LS-0380-00
KAIG3-RFI-SW-LS-0378 00 KAIG3-RFI-SW-LS-0378-00
KAIG3-RFI-SW-S-3495 00 KAIG3-RFI-SW-S-3495-00
KAIG3-RFI-SW-S-3494 00 KAIG3-RFI-SW-S-3494-00
KAIG3-RFI-CO-S-3514 00 KAIG3-RFI-CO-S-3514-00
KAIG3-RFI-CO-S-3513 00 KAIG3-RFI-CO-S-3513-00
KAIG3-RFI-CO-S-3512 00 KAIG3-RFI-CO-S-3512-00
KAIG3-RFI-CO-S-3511 00 KAIG3-RFI-CO-S-3511-00
KAIG3-RFI-CO-S-3510 00 KAIG3-RFI-CO-S-3510-00
KAIG3-RFI-CO-S-3509 00 KAIG3-RFI-CO-S-3509-00
KAIG3-RFI-CO-S-3508 00 KAIG3-RFI-CO-S-3508-00
KAIG3-RFI-CO-SU-1439 00 KAIG3-RFI-CO-SU-1439-00
KAIG3-RFI-CO-SU-1438 00 KAIG3-RFI-CO-SU-1438-00
KAIG3-RFI-CO-S-3507 00 KAIG3-RFI-CO-S-3507-00
KAIG3-RFI-CO-S-3506 00 KAIG3-RFI-CO-S-3506-00
KAIG3-RFI-CO-S-3505 00 KAIG3-RFI-CO-S-3505-00
KAIG3-RFI-CO-S-3504 00 KAIG3-RFI-CO-S-3504-00
KAIG3-RFI-SA-M-0126 01 KAIG3-RFI-SA-M-0126-01
KAIG3-RFI-CO-SU-1437 00 KAIG3-RFI-CO-SU-1437-00
KAIG3-RFI-CO-S-3498 00 KAIG3-RFI-CO-S-3498-00
KAIG3-RFI-CO-S-3497 00 KAIG3-RFI-CO-S-3497-00
KAIG3-RFI-CO-S-3496 00 KAIG3-RFI-CO-S-3496-00
KAIG3-RFI-MB-A-0455 00 KAIG3-RFI-MB-A-0455-00
KAIG3-RFI-SW-C-0179 00 KAIG3-RFI-SW-C-0179-00
KAIG3-RFI-SW-C-0178 00 KAIG3-RFI-SW-C-0178-00
KAIG3-RFI-SW-C-0177 00 KAIG3-RFI-SW-C-0177-00
KAIG3-RFI-SW-C-0176 00 KAIG3-RFI-SW-C-0176-00
KAIG3-RFI-SW-C-0175 00 KAIG3-RFI-SW-C-0175-00
KAIG3-RFI-SW-C-0174 00 KAIG3-RFI-SW-C-0174-00
KAIG3-RFI-SW-C-0173 00 KAIG3-RFI-SW-C-0173-00
KAIG3-RFI-SW-C-0172 00 KAIG3-RFI-SW-C-0172-00
KAIG3-RFI-SW-C-0171 00 KAIG3-RFI-SW-C-0171-00
KAIG3-RFI-SW-S-3480 00 KAIG3-RFI-SW-S-3480-00
KAIG3-RFI-CO-SU-1436 00 KAIG3-RFI-CO-SU-1436-00
KAIG3-RFI-CO-SU-1435 00 KAIG3-RFI-CO-SU-1435-00
KAIG3-RFI-MB-E-0185 00 KAIG3-RFI-MB-E-0185-00
KAIG3-RFI-CO-LC-0167 00 KAIG3-RFI-CO-LC-0167-00
KAIG3-RFI-CO-LC-0166 00 KAIG3-RFI-CO-LC-0166-00
KAIG3-RFI-CO-LC-0165 00 KAIG3-RFI-CO-LC-0165-00
KAIG3-RFI-PA-S-3314 01 KAIG3-RFI-PA-S-3314-01
KAIG3-RFI-SW-LS-0377 00 KAIG3-RFI-SW-LS-0377-00
KAIG3-RFI-SW-LS-0376 00 KAIG3-RFI-SW-LS-0376-00
KAIG3-RFI-PA-S-3459 00 KAIG3-RFI-PA-S-3459-00
KAIG3-RFI-PA-S-3458 00 KAIG3-RFI-PA-S-3458-00
KAIG3-RFI-PA-S-3457 00 KAIG3-RFI-PA-S-3457-00
KAIG3-RFI-PA-S-3456 00 KAIG3-RFI-PA-S-3456-00
KAIG3-RFI-CO-S-3483 00 KAIG3-RFI-CO-S-3483-00
KAIG3-RFI-CO-S-3482 00 KAIG3-RFI-CO-S-3482-00
KAIG3-RFI-CO-S-3481 00 KAIG3-RFI-CO-S-3481-00
KAIG3-RFI-CO-S-3478 00 KAIG3-RFI-CO-S-3478-00
KAIG3-RFI-CO-S-3477 00 KAIG3-RFI-CO-S-3477-00
KAIG3-RFI-CO-S-3476 00 KAIG3-RFI-CO-S-3476-00
KAIG3-RFI-CO-S-3475 00 KAIG3-RFI-CO-S-3475-00
KAIG3-RFI-CO-S-3474 00 KAIG3-RFI-CO-S-3474-00
KAIG3-RFI-CO-S-3473 00 KAIG3-RFI-CO-S-3473-00
KAIG3-RFI-CO-S-3472 00 KAIG3-RFI-CO-S-3472-00
KAIG3-RFI-CO-S-3471 00 KAIG3-RFI-CO-S-3471-00
KAIG3-RFI-CO-S-3470 00 KAIG3-RFI-CO-S-3470-00
KAIG3-RFI-CO-S-3469 00 KAIG3-RFI-CO-S-3469-00
KAIG3-RFI-CO-S-3468 00 KAIG3-RFI-CO-S-3468-00
KAIG3-RFI-CO-S-3467 00 KAIG3-RFI-CO-S-3467-00
KAIG3-RFI-CO-S-3479 00 KAIG3-RFI-CO-S-3479-00
KAIG3-RFI-CO-S-3466 00 KAIG3-RFI-CO-S-3466-00
KAIG3-RFI-CO-S-3465 00 KAIG3-RFI-CO-S-3465-00
KAIG3-RFI-CO-S-3464 00 KAIG3-RFI-CO-S-3464-00
KAIG3-RFI-CO-S-3463 00 KAIG3-RFI-CO-S-3463-00
KAIG3-RFI-CO-E-0184 00 KAIG3-RFI-CO-E-0184-00
KAIG3-RFI-TB-S-3462 00 KAIG3-RFI-TB-S-3462-00
KAIG3-RFI-CO-E-0183 00 KAIG3-RFI-CO-E-0183-00
KAIG3-RFI-CO-E-0182 00 KAIG3-RFI-CO-E-0182-00
KAIG3-RFI-SW-LS-0379 00 KAIG3-RFI-SW-LS-0379-00
KAIG3-RFI-SW-S-3454 00 KAIG3-RFI-SW-S-3454-00
KAIG3-RFI-PA-S-3451 00 KAIG3-RFI-PA-S-3451-00
KAIG3-RFI-CO-S-3057 01 KAIG3-RFI-CO-S-3057-01
KAIG3-RFI-CO-S-3056 01 KAIG3-RFI-CO-S-3056-01
KAIG3-RFI-CO-S-2721 01 KAIG3-RFI-CO-S-2721-01
KAIG3-RFI-SW-C-0163 00 KAIG3-RFI-SW-C-0163-00
KAIG3-RFI-CO-SU-1433 00 KAIG3-RFI-CO-SU-1433-00
KAIG3-RFI-CO-S-3453 00 KAIG3-RFI-CO-S-3453-00
KAIG3-RFI-CO-S-3452 00 KAIG3-RFI-CO-S-3452-00
KAIG3-RFI-PG-C-0170 00 KAIG3-RFI-PG-C-0170-00
KAIG3-RFI-SW-S-3449 00 KAIG3-RFI-SW-S-3449-00
KAIG3-RFI-PA-S-3442 00 KAIG3-RFI-PA-S-3442-00
KAIG3-RFI-PA-S-3441 00 KAIG3-RFI-PA-S-3441-00
KAIG3-RFI-PA-S-3440 00 KAIG3-RFI-PA-S-3440-00
KAIG3-RFI-PA-S-3439 00 KAIG3-RFI-PA-S-3439-00
KAIG3-RFI-PA-S-3438 00 KAIG3-RFI-PA-S-3438-00
KAIG3-RFI-MB-E-0180 00 KAIG3-RFI-MB-E-0180-00
KAIG3-RFI-PG-C-0169 00 KAIG3-RFI-PG-C-0169-00
KAIG3-RFI-WG-LS-0226 01 KAIG3-RFI-WG-LS-0226-01
KAIG3-RFI-WG-S-3437 00 KAIG3-RFI-WG-S-3437-00
KAIG3-RFI-WG-S-3436 00 KAIG3-RFI-WG-S-3436-00
KAIG3-RFI-AG-S-3435 00 KAIG3-RFI-AG-S-3435-00
KAIG3-RFI-WG-S-3434 00 KAIG3-RFI-WG-S-3434-00
KAIG3-RFI-WG-C-0160 00 KAIG3-RFI-WG-C-0160-00
KAIG3-RFI-WG-SU-1415 01 KAIG3-RFI-WG-SU-1415-01
KAIG3-RFI-ZG-LS-0375 00 KAIG3-RFI-ZG-LS-0375-00
KAIG3-RFI-WG-LS-0374 00 KAIG3-RFI-WG-LS-0374-00
KAIG3-RFI-WG-S-3433 00 KAIG3-RFI-WG-S-3433-00
KAIG3-RFI-WG-S-3432 00 KAIG3-RFI-WG-S-3432-00
KAIG3-RFI-WG-S-3431 00 KAIG3-RFI-WG-S-3431-00
KAIG3-RFI-WG-S-3430 00 KAIG3-RFI-WG-S-3430-00
KAIG3-RFI-WG-S-3429 00 KAIG3-RFI-WG-S-3429-00
KAIG3-RFI-WG-S-3427 00 KAIG3-RFI-WG-S-3427-00
KAIG3-RFI-WG-S-3426 00 KAIG3-RFI-WG-S-3426-00
KAIG3-RFI-WG-S-3425 00 KAIG3-RFI-WG-S-3425-00
KAIG3-RFI-WG-S-3424 00 KAIG3-RFI-WG-S-3424-00
KAIG3-RFI-WG-S-3423 00 KAIG3-RFI-WG-S-3423-00
KAIG3-RFI-CO-SU-1432 00 KAIG3-RFI-CO-SU-1432-00
KAIG3-RFI-WG-A-0454 00 KAIG3-RFI-WG-A-0454-00
KAIG3-RFI-CO-SU-1431 00 KAIG3-RFI-CO-SU-1431-00
KAIG3-RFI-WG-S-3421 00 KAIG3-RFI-WG-S-3421-00
KAIG3-RFI-WG-S-3400 00 KAIG3-RFI-WG-S-3400-00
KAIG3-RFI-WG-S-3399 00 KAIG3-RFI-WG-S-3399-00
KAIG3-RFI-CO-SU-1402 01 KAIG3-RFI-CO-SU-1402-01
KAIG3-RFI-CO-S-3450 00 KAIG3-RFI-CO-S-3450-00
KAIG3-RFI-CO-S-3448 00 KAIG3-RFI-CO-S-3448-00
KAIG3-RFI-PG-LS-0373 00 KAIG3-RFI-PG-LS-0373-00
KAIG3-RFI-CO-S-3447 00 KAIG3-RFI-CO-S-3447-00
KAIG3-RFI-CO-S-3446 00 KAIG3-RFI-CO-S-3446-00
KAIG3-RFI-WG-LS-0372 00 KAIG3-RFI-WG-LS-0372-00
KAIG3-RFI-CO-S-3445 00 KAIG3-RFI-CO-S-3445-00
KAIG3-RFI-SW-A-0453 00 KAIG3-RFI-SW-A-0453-00
KAIG3-RFI-CO-S-3444 00 KAIG3-RFI-CO-S-3444-00
KAIG3-RFI-CO-S-3443 00 KAIG3-RFI-CO-S-3443-00
KAIG3-RFI-TG-C-0159 00 KAIG3-RFI-TG-C-0159-00
KAIG3-RFI-DG-C-0158 00 KAIG3-RFI-DG-C-0158-00
KAIG3-RFI-CO-S-3213 01 KAIG3-RFI-CO-S-3213-01
KAIG3-RFI-CO-S-3212 01 KAIG3-RFI-CO-S-3212-01
KAIG3-RFI-WG-S-3323 01 KAIG3-RFI-WG-S-3323-01
KAIG3-RFI-SW-C-0168 00 KAIG3-RFI-SW-C-0168-00
KAIG3-RFI-SW-C-0167 00 KAIG3-RFI-SW-C-0167-00
KAIG3-RFI-SW-C-0166 00 KAIG3-RFI-SW-C-0166-00
KAIG3-RFI-SW-C-0165 00 KAIG3-RFI-SW-C-0165-00
KAIG3-RFI-SW-C-0164 00 KAIG3-RFI-SW-C-0164-00
KAIG3-RFI-TG-C-0162 00 KAIG3-RFI-TG-C-0162-00
KAIG3-RFI-DG-C-0161 00 KAIG3-RFI-DG-C-0161-00
KAIG3-RFI-SW-LS-0371 00 KAIG3-RFI-SW-LS-0371-00
KAIG3-RFI-SW-LS-0370 00 KAIG3-RFI-SW-LS-0370-00
KAIG3-RFI-SW-LS-0369 00 KAIG3-RFI-SW-LS-0369-00
KAIG3-RFI-SW-LS-0368 00 KAIG3-RFI-SW-LS-0368-00
KAIG3-RFI-PA-S-3419 00 KAIG3-RFI-PA-S-3419-00
KAIG3-RFI-PA-S-3418 00 KAIG3-RFI-PA-S-3418-00
KAIG3-RFI-PA-S-3417 00 KAIG3-RFI-PA-S-3417-00
KAIG3-RFI-PA-S-3416 00 KAIG3-RFI-PA-S-3416-00
KAIG3-RFI-TB-SU-1420 01 KAIG3-RFI-TB-SU-1420-01
KAIG3-RFI-NA-P-0125 00 KAIG3-RFI-NA-P-0125-00
KAIG3-RFI-SA-M-0126 00 KAIG3-RFI-SA-M-0126-00
KAIG3-RFI-CO-S-3420 00 KAIG3-RFI-CO-S-3420-00
KAIG3-RFI-SW-C-0157 00 KAIG3-RFI-SW-C-0157-00
KAIG3-RFI-SW-C-0156 00 KAIG3-RFI-SW-C-0156-00
KAIG3-RFI-SW-C-0155 00 KAIG3-RFI-SW-C-0155-00
KAIG3-RFI-SW-C-0152 00 KAIG3-RFI-SW-C-0152-00
KAIG3-RFI-PA-S-3415 00 KAIG3-RFI-PA-S-3415-00
KAIG3-RFI-PA-S-3409 00 KAIG3-RFI-PA-S-3409-00
KAIG3-RFI-PA-S-3408 00 KAIG3-RFI-PA-S-3408-00
KAIG3-RFI-PA-S-3407 00 KAIG3-RFI-PA-S-3407-00
KAIG3-RFI-PA-S-3406 00 KAIG3-RFI-PA-S-3406-00
KAIG3-RFI-PA-S-3405 00 KAIG3-RFI-PA-S-3405-00
KAIG3-RFI-PA-S-3404 00 KAIG3-RFI-PA-S-3404-00
KAIG3-RFI-PA-S-3403 00 KAIG3-RFI-PA-S-3403-00
KAIG3-RFI-PA-S-3372 00 KAIG3-RFI-PA-S-3372-00
KAIG3-RFI-CO-SU-1430 00 KAIG3-RFI-CO-SU-1430-00
KAIG3-RFI-CO-SU-1429 00 KAIG3-RFI-CO-SU-1429-00
KAIG3-RFI-CO-SU-1428 00 KAIG3-RFI-CO-SU-1428-00
KAIG3-RFI-CO-S-3414 00 KAIG3-RFI-CO-S-3414-00
KAIG3-RFI-CO-S-3413 00 KAIG3-RFI-CO-S-3413-00
KAIG3-RFI-CO-S-3412 00 KAIG3-RFI-CO-S-3412-00
KAIG3-RFI-CO-S-3411 00 KAIG3-RFI-CO-S-3411-00
KAIG3-RFI-CO-S-3410 00 KAIG3-RFI-CO-S-3410-00
KAIG3-RFI-CO-SU-1427 00 KAIG3-RFI-CO-SU-1427-00
KAIG3-RFI-CO-SU-1426 00 KAIG3-RFI-CO-SU-1426-00
KAIG3-RFI-SW-C-0151 00 KAIG3-RFI-SW-C-0151-00
KAIG3-RFI-SW-S-3395 00 KAIG3-RFI-SW-S-3395-00
KAIG3-RFI-PA-S-3394 00 KAIG3-RFI-PA-S-3394-00
KAIG3-RFI-PA-S-3393 00 KAIG3-RFI-PA-S-3393-00
KAIG3-RFI-PA-S-3392 00 KAIG3-RFI-PA-S-3392-00
KAIG3-RFI-PA-S-3391 00 KAIG3-RFI-PA-S-3391-00
KAIG3-RFI-PA-S-3390 00 KAIG3-RFI-PA-S-3390-00
KAIG3-RFI-PA-S-3389 00 KAIG3-RFI-PA-S-3389-00
KAIG3-RFI-PA-S-3388 00 KAIG3-RFI-PA-S-3388-00
KAIG3-RFI-PA-S-3387 00 KAIG3-RFI-PA-S-3387-00
KAIG3-RFI-PA-S-3386 00 KAIG3-RFI-PA-S-3386-00
KAIG3-RFI-PA-S-3375 00 KAIG3-RFI-PA-S-3375-00
KAIG3-RFI-PG-LS-0367 00 KAIG3-RFI-PG-LS-0367-00
KAIG3-RFI-PA-S-3374 00 KAIG3-RFI-PA-S-3374-00
KAIG3-RFI-WG-S-3398 00 KAIG3-RFI-WG-S-3398-00
KAIG3-RFI-PA-S-3373 00 KAIG3-RFI-PA-S-3373-00
KAIG3-RFI-WG-S-3397 00 KAIG3-RFI-WG-S-3397-00
KAIG3-RFI-WG-S-3396 00 KAIG3-RFI-WG-S-3396-00
KAIG3-RFI-AG-S-3381 00 KAIG3-RFI-AG-S-3381-00
KAIG3-RFI-WG-S-3380 00 KAIG3-RFI-WG-S-3380-00
KAIG3-RFI-WG-S-3379 00 KAIG3-RFI-WG-S-3379-00
KAIG3-RFI-AG-S-3378 00 KAIG3-RFI-AG-S-3378-00
KAIG3-RFI-AG-SU-1425 00 KAIG3-RFI-AG-SU-1425-00
KAIG3-RFI-WG-SU-1424 00 KAIG3-RFI-WG-SU-1424-00
KAIG3-RFI-WG-S-3377 00 KAIG3-RFI-WG-S-3377-00
KAIG3-RFI-PA-S-3371 00 KAIG3-RFI-PA-S-3371-00
KAIG3-RFI-WG-S-3376 00 KAIG3-RFI-WG-S-3376-00
KAIG3-RFI-WG-A-0452 00 KAIG3-RFI-WG-A-0452-00
KAIG3-RFI-WG-A-0451 00 KAIG3-RFI-WG-A-0451-00
KAIG3-RFI-CO-S-3402 00 KAIG3-RFI-CO-S-3402-00
KAIG3-RFI-CO-S-3401 00 KAIG3-RFI-CO-S-3401-00
KAIG3-RFI-CO-S-3201 01 KAIG3-RFI-CO-S-3201-01
KAIG3-RFI-CO-S-3385 00 KAIG3-RFI-CO-S-3385-00
KAIG3-RFI-CO-S-3384 00 KAIG3-RFI-CO-S-3384-00
KAIG3-RFI-CO-S-3383 00 KAIG3-RFI-CO-S-3383-00
KAIG3-RFI-CO-S-3370 00 KAIG3-RFI-CO-S-3370-00
KAIG3-RFI-CO-S-3382 00 KAIG3-RFI-CO-S-3382-00
KAIG3-RFI-CO-S-3369 00 KAIG3-RFI-CO-S-3369-00
KAIG3-RFI-SW-C-0154 00 KAIG3-RFI-SW-C-0154-00
KAIG3-RFI-SW-C-0153 00 KAIG3-RFI-SW-C-0153-00
KAIG3-RFI-TB-S-3366 00 KAIG3-RFI-TB-S-3366-00
KAIG3-RFI-WG-S-3365 00 KAIG3-RFI-WG-S-3365-00
KAIG3-RFI-PA-S-3289 01 KAIG3-RFI-PA-S-3289-01
KAIG3-RFI-WG-S-3364 00 KAIG3-RFI-WG-S-3364-00
KAIG3-RFI-WG-SU-1422 00 KAIG3-RFI-WG-SU-1422-00
KAIG3-RFI-PA-S-3288 01 KAIG3-RFI-PA-S-3288-01
KAIG3-RFI-WG-SU-1421 00 KAIG3-RFI-WG-SU-1421-00
KAIG3-RFI-AG-S-3362 00 KAIG3-RFI-AG-S-3362-00
KAIG3-RFI-TB-SU-1420 00 KAIG3-RFI-TB-SU-1420-00
KAIG3-RFI-PA-S-3287 01 KAIG3-RFI-PA-S-3287-01
KAIG3-RFI-AG-SU-1419 00 KAIG3-RFI-AG-SU-1419-00
KAIG3-RFI-SW-LS-0366 00 KAIG3-RFI-SW-LS-0366-00
KAIG3-RFI-SW-C-0149 00 KAIG3-RFI-SW-C-0149-00
KAIG3-RFI-SW-C-0148 00 KAIG3-RFI-SW-C-0148-00
KAIG3-RFI-TG-C-0145 00 KAIG3-RFI-TG-C-0145-00
KAIG3-RFI-WG-C-0143 00 KAIG3-RFI-WG-C-0143-00
KAIG3-RFI-CO-SU-1418 00 KAIG3-RFI-CO-SU-1418-00
KAIG3-RFI-CO-S-3368 00 KAIG3-RFI-CO-S-3368-00
KAIG3-RFI-CO-S-3367 00 KAIG3-RFI-CO-S-3367-00
KAIG3-RFI-CO-S-1517 01 KAIG3-RFI-CO-S-1517-01
KAIG3-RFI-PA-S-3361 00 KAIG3-RFI-PA-S-3361-00
KAIG3-RFI-PA-S-3360 00 KAIG3-RFI-PA-S-3360-00
KAIG3-RFI-PA-S-3359 00 KAIG3-RFI-PA-S-3359-00
KAIG3-RFI-SW-C-3355 00 KAIG3-RFI-SW-C-3355-00
KAIG3-RFI-SW-C-0150 00 KAIG3-RFI-SW-C-0150-00
KAIG3-RFI-SW-C-0147 00 KAIG3-RFI-SW-C-0147-00
KAIG3-RFI-SW-C-0146 00 KAIG3-RFI-SW-C-0146-00
KAIG3-RFI-MB-E-0179 00 KAIG3-RFI-MB-E-0179-00
KAIG3-RFI-PA-S-3342 00 KAIG3-RFI-PA-S-3342-00
KAIG3-RFI-DG-C-0138 00 KAIG3-RFI-DG-C-0138-00
KAIG3-RFI-MB-A-0450 00 KAIG3-RFI-MB-A-0450-00
KAIG3-RFI-PG-S-3337 00 KAIG3-RFI-PG-S-3337-00
KAIG3-RFI-PG-C-0137 00 KAIG3-RFI-PG-C-0137-00
KAIG3-RFI-SW-A-0442 01 KAIG3-RFI-SW-A-0442-01
KAIG3-RFI-CO-S-3177 01 KAIG3-RFI-CO-S-3177-01
KAIG3-RFI-CO-S-2614 01 KAIG3-RFI-CO-S-2614-01
KAIG3-RFI-CO-S-3358 00 KAIG3-RFI-CO-S-3358-00
KAIG3-RFI-CO-S-3357 00 KAIG3-RFI-CO-S-3357-00
KAIG3-RFI-CO-S-3356 00 KAIG3-RFI-CO-S-3356-00
KAIG3-RFI-CO-S-3346 00 KAIG3-RFI-CO-S-3346-00
KAIG3-RFI-CO-S-3345 00 KAIG3-RFI-CO-S-3345-00
KAIG3-RFI-CO-S-3344 00 KAIG3-RFI-CO-S-3344-00
KAIG3-RFI-PG-C-0142 00 KAIG3-RFI-PG-C-0142-00
KAIG3-RFI-PA-S-3354 00 KAIG3-RFI-PA-S-3354-00
KAIG3-RFI-PA-S-3353 00 KAIG3-RFI-PA-S-3353-00
KAIG3-RFI-PA-S-3352 00 KAIG3-RFI-PA-S-3352-00
KAIG3-RFI-PA-S-3351 00 KAIG3-RFI-PA-S-3351-00
KAIG3-RFI-PA-S-3350 00 KAIG3-RFI-PA-S-3350-00
KAIG3-RFI-PA-S-3349 00 KAIG3-RFI-PA-S-3349-00
KAIG3-RFI-PA-S-3348 00 KAIG3-RFI-PA-S-3348-00
KAIG3-RFI-PA-S-3347 00 KAIG3-RFI-PA-S-3347-00
KAIG3-RFI-PA-S-3343 00 KAIG3-RFI-PA-S-3343-00
KAIG3-RFI-PA-S-3341 00 KAIG3-RFI-PA-S-3341-00
KAIG3-RFI-PA-S-3340 00 KAIG3-RFI-PA-S-3340-00
KAIG3-RFI-PA-S-3339 00 KAIG3-RFI-PA-S-3339-00
KAIG3-RFI-PA-S-3338 00 KAIG3-RFI-PA-S-3338-00
KAIG3-RFI-SW-C-0141 00 KAIG3-RFI-SW-C-0141-00
KAIG3-RFI-SW-C-0140 00 KAIG3-RFI-SW-C-0140-00
KAIG3-RFI-SW-C-0139 00 KAIG3-RFI-SW-C-0139-00
KAIG3-RFI-CO-E-0168 00 KAIG3-RFI-CO-E-0168-00
KAIG3-RFI-SW-C-3334 00 KAIG3-RFI-SW-C-3334-00
KAIG3-RFI-PA-S-3333 00 KAIG3-RFI-PA-S-3333-00
KAIG3-RFI-PA-S-3332 00 KAIG3-RFI-PA-S-3332-00
KAIG3-RFI-PA-S-3331 00 KAIG3-RFI-PA-S-3331-00
KAIG3-RFI-SW-S-3330 00 KAIG3-RFI-SW-S-3330-00
KAIG3-RFI-SW-S-3329 00 KAIG3-RFI-SW-S-3329-00
KAIG3-RFI-SW-S-3328 00 KAIG3-RFI-SW-S-3328-00
KAIG3-RFI-SW-S-3327 00 KAIG3-RFI-SW-S-3327-00
KAIG3-RFI-PA-S-3326 00 KAIG3-RFI-PA-S-3326-00
KAIG3-RFI-PA-S-3325 00 KAIG3-RFI-PA-S-3325-00
KAIG3-RFI-PA-S-3324 00 KAIG3-RFI-PA-S-3324-00
KAIG3-RFI-PA-S-3322 00 KAIG3-RFI-PA-S-3322-00
KAIG3-RFI-PA-S-3321 00 KAIG3-RFI-PA-S-3321-00
KAIG3-RFI-PA-S-3320 00 KAIG3-RFI-PA-S-3320-00
KAIG3-RFI-PA-S-3319 00 KAIG3-RFI-PA-S-3319-00
KAIG3-RFI-PA-S-3318 00 KAIG3-RFI-PA-S-3318-00
KAIG3-RFI-WG-S-3336 00 KAIG3-RFI-WG-S-3336-00
KAIG3-RFI-WG-S-3335 00 KAIG3-RFI-WG-S-3335-00
KAIG3-RFI-PG-A-0445 00 KAIG3-RFI-PG-A-0445-00
KAIG3-RFI-WG-S-3323 00 KAIG3-RFI-WG-S-3323-00
KAIG3-RFI-SW-C-0134 00 KAIG3-RFI-SW-C-0134-00
KAIG3-RFI-MB-P-0110 00 KAIG3-RFI-MB-P-0110-00
KAIG3-RFI-AG-E-0178 00 KAIG3-RFI-AG-E-0178-00
KAIG3-RFI-SW-LS-0349 01 KAIG3-RFI-SW-LS-0349-01
KAIG3-RFI-PA-S-3314 00 KAIG3-RFI-PA-S-3314-00
KAIG3-RFI-PA-S-3313 00 KAIG3-RFI-PA-S-3313-00
KAIG3-RFI-PA-S-3312 00 KAIG3-RFI-PA-S-3312-00
KAIG3-RFI-PA-S-3311 00 KAIG3-RFI-PA-S-3311-00
KAIG3-RFI-PA-S-3310 00 KAIG3-RFI-PA-S-3310-00
KAIG3-RFI-PA-S-3309 00 KAIG3-RFI-PA-S-3309-00
KAIG3-RFI-PA-S-3302 00 KAIG3-RFI-PA-S-3302-00
KAIG3-RFI-SW-S-3301 00 KAIG3-RFI-SW-S-3301-00
KAIG3-RFI-SW-S-3300 00 KAIG3-RFI-SW-S-3300-00
KAIG3-RFI-SW-S-3299 00 KAIG3-RFI-SW-S-3299-00
KAIG3-RFI-PA-S-3303 00 KAIG3-RFI-PA-S-3303-00
KAIG3-RFI-AG-S-3308 00 KAIG3-RFI-AG-S-3308-00
KAIG3-RFI-WG-S-3282 00 KAIG3-RFI-WG-S-3282-00
KAIG3-RFI-WG-S-3281 00 KAIG3-RFI-WG-S-3281-00
KAIG3-RFI-CO-S-3317 00 KAIG3-RFI-CO-S-3317-00
KAIG3-RFI-CO-S-3316 00 KAIG3-RFI-CO-S-3316-00
KAIG3-RFI-CO-S-3315 00 KAIG3-RFI-CO-S-3315-00
KAIG3-RFI-CO-SU-1400 01 KAIG3-RFI-CO-SU-1400-01
KAIG3-RFI-CO-S-3307 00 KAIG3-RFI-CO-S-3307-00
KAIG3-RFI-CO-S-3306 00 KAIG3-RFI-CO-S-3306-00
KAIG3-RFI-CO-S-3305 00 KAIG3-RFI-CO-S-3305-00
KAIG3-RFI-CO-S-3304 00 KAIG3-RFI-CO-S-3304-00
KAIG3-RFI-MB-E-0177 00 KAIG3-RFI-MB-E-0177-00
KAIG3-RFI-CO-SU-1401 01 KAIG3-RFI-CO-SU-1401-01
KAIG3-RFI-SW-C-0136 00 KAIG3-RFI-SW-C-0136-00
KAIG3-RFI-WG-E-0176 00 KAIG3-RFI-WG-E-0176-00
KAIG3-RFI-PA-S-3298 00 KAIG3-RFI-PA-S-3298-00
KAIG3-RFI-PA-S-3297 00 KAIG3-RFI-PA-S-3297-00
KAIG3-RFI-PA-S-3295 00 KAIG3-RFI-PA-S-3295-00
KAIG3-RFI-SW-S-3294 00 KAIG3-RFI-SW-S-3294-00
KAIG3-RFI-SW-S-3293 00 KAIG3-RFI-SW-S-3293-00
KAIG3-RFI-SW-S-3292 00 KAIG3-RFI-SW-S-3292-00
KAIG3-RFI-SW-S-3290 00 KAIG3-RFI-SW-S-3290-00
KAIG3-RFI-PA-S-3289 00 KAIG3-RFI-PA-S-3289-00
KAIG3-RFI-PA-S-3288 00 KAIG3-RFI-PA-S-3288-00
KAIG3-RFI-PA-S-3287 00 KAIG3-RFI-PA-S-3287-00
KAIG3-RFI-PA-S-3286 00 KAIG3-RFI-PA-S-3286-00
KAIG3-RFI-PA-S-3285 00 KAIG3-RFI-PA-S-3285-00
KAIG3-RFI-WG-S-3296 00 KAIG3-RFI-WG-S-3296-00
KAIG3-RFI-ZG-LS-0365 00 KAIG3-RFI-ZG-LS-0365-00
KAIG3-RFI-WG-SU-1415 00 KAIG3-RFI-WG-SU-1415-00
KAIG3-RFI-WG-SU-1414 00 KAIG3-RFI-WG-SU-1414-00
KAIG3-RFI-WG-S-3291 00 KAIG3-RFI-WG-S-3291-00
KAIG3-RFI-WG-SU-1410 00 KAIG3-RFI-WG-SU-1410-00
KAIG3-RFI-CO-S-2790 01 KAIG3-RFI-CO-S-2790-01
KAIG3-RFI-CO-SU-1416 00 KAIG3-RFI-CO-SU-1416-00
KAIG3-RFI-CO-SU-1403 01 KAIG3-RFI-CO-SU-1403-01
KAIG3-RFI-CO-S-3210 00 KAIG3-RFI-CO-S-3210-00
KAIG3-RFI-CO-S-3209 00 KAIG3-RFI-CO-S-3209-00
KAIG3-RFI-CO-S-2795 01 KAIG3-RFI-CO-S-2795-01
KAIG3-RFI-CO-S-2794 01 KAIG3-RFI-CO-S-2794-01
KAIG3-RFI-CO-S-2793 01 KAIG3-RFI-CO-S-2793-01
KAIG3-RFI-CO-S-2792 01 KAIG3-RFI-CO-S-2792-01
KAIG3-RFI-CO-S-2789 01 KAIG3-RFI-CO-S-2789-01
KAIG3-RFI-CO-S-2788 01 KAIG3-RFI-CO-S-2788-01
KAIG3-RFI-CO-S-2787 01 KAIG3-RFI-CO-S-2787-01
KAIG3-RFI-SW-C-0135 00 KAIG3-RFI-SW-C-0135-00
KAIG3-RFI-CO-S-3196 00 KAIG3-RFI-CO-S-3196-00
KAIG3-RFI-SW-SU-1374 01 KAIG3-RFI-SW-SU-1374-01
KAIG3-RFI-SW-LS-0364 00 KAIG3-RFI-SW-LS-0364-00
KAIG3-RFI-SW-LS-0363 00 KAIG3-RFI-SW-LS-0363-00
KAIG3-RFI-SW-LS-0362 00 KAIG3-RFI-SW-LS-0362-00
KAIG3-RFI-SW-LS-0356 01 KAIG3-RFI-SW-LS-0356-01
KAIG3-RFI-SW-LS-0328 02 KAIG3-RFI-SW-LS-0328-02
KAIG3-RFI-SW-LS-0230 02 KAIG3-RFI-SW-LS-0230-02
KAIG3-RFI-PA-S-3274 00 KAIG3-RFI-PA-S-3274-00
KAIG3-RFI-WG-A-0444 00 KAIG3-RFI-WG-A-0444-00
KAIG3-RFI-PA-S-3273 00 KAIG3-RFI-PA-S-3273-00
KAIG3-RFI-WG-S-3283 00 KAIG3-RFI-WG-S-3283-00
KAIG3-RFI-PA-S-3272 00 KAIG3-RFI-PA-S-3272-00
KAIG3-RFI-WG-S-2809 01 KAIG3-RFI-WG-S-2809-01
KAIG3-RFI-WG-S-2808 01 KAIG3-RFI-WG-S-2808-01
KAIG3-RFI-WG-S-3280 00 KAIG3-RFI-WG-S-3280-00
KAIG3-RFI-WG-S-3279 00 KAIG3-RFI-WG-S-3279-00
KAIG3-RFI-WG-S-3278 00 KAIG3-RFI-WG-S-3278-00
KAIG3-RFI-WG-S-3277 00 KAIG3-RFI-WG-S-3277-00
KAIG3-RFI-WG-S-3269 00 KAIG3-RFI-WG-S-3269-00
KAIG3-RFI-WG-S-3268 00 KAIG3-RFI-WG-S-3268-00
KAIG3-RFI-WG-S-3267 00 KAIG3-RFI-WG-S-3267-00
KAIG3-RFI-WG-S-3266 00 KAIG3-RFI-WG-S-3266-00
KAIG3-RFI-WG-S-3265 00 KAIG3-RFI-WG-S-3265-00
KAIG3-RFI-WG-S-3264 00 KAIG3-RFI-WG-S-3264-00
KAIG3-RFI-WG-S-3263 00 KAIG3-RFI-WG-S-3263-00
KAIG3-RFI-CO-S-3284 00 KAIG3-RFI-CO-S-3284-00
KAIG3-RFI-CO-SU-1409 00 KAIG3-RFI-CO-SU-1409-00
KAIG3-RFI-CO-S-3271 00 KAIG3-RFI-CO-S-3271-00
KAIG3-RFI-CO-S-3270 00 KAIG3-RFI-CO-S-3270-00
KAIG3-RFI-TB-E-0175 00 KAIG3-RFI-TB-E-0175-00
KAIG3-RFI-SW-C-0133 00 KAIG3-RFI-SW-C-0133-00
KAIG3-RFI-SW-LS-0360 00 KAIG3-RFI-SW-LS-0360-00
KAIG3-RFI-SW-LS-0359 00 KAIG3-RFI-SW-LS-0359-00
KAIG3-RFI-PA-LS-0325 02 KAIG3-RFI-PA-LS-0325-02
KAIG3-RFI-PA-S-3262 00 KAIG3-RFI-PA-S-3262-00
KAIG3-RFI-PA-S-3261 00 KAIG3-RFI-PA-S-3261-00
KAIG3-RFI-PA-S-3260 00 KAIG3-RFI-PA-S-3260-00
KAIG3-RFI-PA-S-3259 00 KAIG3-RFI-PA-S-3259-00
KAIG3-RFI-PA-S-3258 00 KAIG3-RFI-PA-S-3258-00
KAIG3-RFI-PA-S-3257 00 KAIG3-RFI-PA-S-3257-00
KAIG3-RFI-PA-S-3256 00 KAIG3-RFI-PA-S-3256-00
KAIG3-RFI-PA-S-3250 00 KAIG3-RFI-PA-S-3250-00
KAIG3-RFI-PA-S-3249 00 KAIG3-RFI-PA-S-3249-00
KAIG3-RFI-PA-S-3245 00 KAIG3-RFI-PA-S-3245-00
KAIG3-RFI-PA-S-3244 00 KAIG3-RFI-PA-S-3244-00
KAIG3-RFI-PA-S-3243 00 KAIG3-RFI-PA-S-3243-00
KAIG3-RFI-PA-S-3242 00 KAIG3-RFI-PA-S-3242-00
KAIG3-RFI-WG-S-3248 00 KAIG3-RFI-WG-S-3248-00
KAIG3-RFI-WG-S-3247 00 KAIG3-RFI-WG-S-3247-00
KAIG3-RFI-WG-SU-1406 00 KAIG3-RFI-WG-SU-1406-00
KAIG3-RFI-WG-S-3246 00 KAIG3-RFI-WG-S-3246-00
KAIG3-RFI-WG-LS-0354 00 KAIG3-RFI-WG-LS-0354-00
KAIG3-RFI-WG-LS-0348 01 KAIG3-RFI-WG-LS-0348-01
KAIG3-RFI-SW-A-0448 00 KAIG3-RFI-SW-A-0448-00
KAIG3-RFI-SW-A-0447 00 KAIG3-RFI-SW-A-0447-00
KAIG3-RFI-CO-S-3255 00 KAIG3-RFI-CO-S-3255-00
KAIG3-RFI-CO-S-3254 00 KAIG3-RFI-CO-S-3254-00
KAIG3-RFI-CO-S-3253 00 KAIG3-RFI-CO-S-3253-00
KAIG3-RFI-CO-S-3252 00 KAIG3-RFI-CO-S-3252-00
KAIG3-RFI-CO-S-3251 00 KAIG3-RFI-CO-S-3251-00
KAIG3-RFI-CO-SU-1408 00 KAIG3-RFI-CO-SU-1408-00
KAIG3-RFI-CO-SU-1407 00 KAIG3-RFI-CO-SU-1407-00
KAIG3-RFI-CO-S-2715 01 KAIG3-RFI-CO-S-2715-01
KAIG3-RFI-SW-C-0132 00 KAIG3-RFI-SW-C-0132-00
KAIG3-RFI-SW-C-0131 00 KAIG3-RFI-SW-C-0131-00
KAIG3-RFI-SW-LS-0358 00 KAIG3-RFI-SW-LS-0358-00
KAIG3-RFI-SW-LS-0357 00 KAIG3-RFI-SW-LS-0357-00
KAIG3-RFI-PA-S-3230 00 KAIG3-RFI-PA-S-3230-00
KAIG3-RFI-PA-S-3229 00 KAIG3-RFI-PA-S-3229-00
KAIG3-RFI-PA-S-3225 00 KAIG3-RFI-PA-S-3225-00
KAIG3-RFI-PA-S-3224 00 KAIG3-RFI-PA-S-3224-00
KAIG3-RFI-PA-S-3223 00 KAIG3-RFI-PA-S-3223-00
KAIG3-RFI-PA-S-3222 00 KAIG3-RFI-PA-S-3222-00
KAIG3-RFI-PA-S-3221 00 KAIG3-RFI-PA-S-3221-00
KAIG3-RFI-PA-S-3220 00 KAIG3-RFI-PA-S-3220-00
KAIG3-RFI-CO-S-3241 00 KAIG3-RFI-CO-S-3241-00
KAIG3-RFI-CO-S-3240 00 KAIG3-RFI-CO-S-3240-00
KAIG3-RFI-PA-S-3219 00 KAIG3-RFI-PA-S-3219-00
KAIG3-RFI-CO-S-3239 00 KAIG3-RFI-CO-S-3239-00
KAIG3-RFI-PA-S-3218 00 KAIG3-RFI-PA-S-3218-00
KAIG3-RFI-CO-S-3238 00 KAIG3-RFI-CO-S-3238-00
KAIG3-RFI-CO-S-3237 00 KAIG3-RFI-CO-S-3237-00
KAIG3-RFI-CO-S-3236 00 KAIG3-RFI-CO-S-3236-00
KAIG3-RFI-WG-S-3232 00 KAIG3-RFI-WG-S-3232-00
KAIG3-RFI-CO-S-3235 00 KAIG3-RFI-CO-S-3235-00
KAIG3-RFI-WG-S-3228 00 KAIG3-RFI-WG-S-3228-00
KAIG3-RFI-WG-S-3227 00 KAIG3-RFI-WG-S-3227-00
KAIG3-RFI-CO-S-3234 00 KAIG3-RFI-CO-S-3234-00
KAIG3-RFI-CO-S-3233 00 KAIG3-RFI-CO-S-3233-00
KAIG3-RFI-CO-SU-1405 00 KAIG3-RFI-CO-SU-1405-00
KAIG3-RFI-CO-SU-1404 00 KAIG3-RFI-CO-SU-1404-00
KAIG3-RFI-SW-C-0130 00 KAIG3-RFI-SW-C-0130-00
KAIG3-RFI-SW-C-0129 00 KAIG3-RFI-SW-C-0129-00
KAIG3-RFI-SW-C-0128 00 KAIG3-RFI-SW-C-0128-00
KAIG3-RFI-CO-SU-1403 00 KAIG3-RFI-CO-SU-1403-00
KAIG3-RFI-CO-SU-1402 00 KAIG3-RFI-CO-SU-1402-00
KAIG3-RFI-CO-SU-1401 00 KAIG3-RFI-CO-SU-1401-00
KAIG3-RFI-CO-SU-1400 00 KAIG3-RFI-CO-SU-1400-00
KAIG3-RFI-CO-S-3213 00 KAIG3-RFI-CO-S-3213-00
KAIG3-RFI-CO-S-3212 00 KAIG3-RFI-CO-S-3212-00
KAIG3-RFI-CO-S-3211 00 KAIG3-RFI-CO-S-3211-00
KAIG3-RFI-CO-S-3208 00 KAIG3-RFI-CO-S-3208-00
KAIG3-RFI-CO-S-3207 00 KAIG3-RFI-CO-S-3207-00
KAIG3-RFI-CO-S-3201 00 KAIG3-RFI-CO-S-3201-00
KAIG3-RFI-CO-S-3200 00 KAIG3-RFI-CO-S-3200-00
KAIG3-RFI-CO-S-3199 00 KAIG3-RFI-CO-S-3199-00
KAIG3-RFI-CO-S-3198 00 KAIG3-RFI-CO-S-3198-00
KAIG3-RFI-CO-S-3197 00 KAIG3-RFI-CO-S-3197-00
KAIG3-RFI-MB-E-0174 00 KAIG3-RFI-MB-E-0174-00
KAIG3-RFI-PG-S-2858 01 KAIG3-RFI-PG-S-2858-01
KAIG3-RFI-PA-S-2651 01 KAIG3-RFI-PA-S-2651-01
KAIG3-RFI-PG-S-2857 01 KAIG3-RFI-PG-S-2857-01
KAIG3-RFI-PG-S-2856 01 KAIG3-RFI-PG-S-2856-01
KAIG3-RFI-PG-S-2855 01 KAIG3-RFI-PG-S-2855-01
KAIG3-RFI-SW-LS-0347 01 KAIG3-RFI-SW-LS-0347-01
KAIG3-RFI-SW-LS-0346 01 KAIG3-RFI-SW-LS-0346-01
KAIG3-RFI-PA-S-3217 00 KAIG3-RFI-PA-S-3217-00
KAIG3-RFI-PA-S-3216 00 KAIG3-RFI-PA-S-3216-00
KAIG3-RFI-PA-S-3215 00 KAIG3-RFI-PA-S-3215-00
KAIG3-RFI-PA-S-3214 00 KAIG3-RFI-PA-S-3214-00
KAIG3-RFI-SW-C-0127 00 KAIG3-RFI-SW-C-0127-00
KAIG3-RFI-SW-C-0126 00 KAIG3-RFI-SW-C-0126-00
KAIG3-RFI-BO-S-0588 00 KAIG3-RFI-BO-S-0588-00
KAIG3-RFI-BO-S-0410 00 KAIG3-RFI-BO-S-0410-00
KAIG3-RFI-BO-S-0523 00 KAIG3-RFI-BO-S-0523-00
KAIG3-RFI-TB-S-0578 00 KAIG3-RFI-TB-S-0578-00
KAIG3-RFI-TB-S-0199 00 KAIG3-RFI-TB-S-0199-00
KAIG3-RFI-MB-A-0165 00 KAIG3-RFI-MB-A-0165-00
KAIG3-RFI-FC-A-0161 01 KAIG3-RFI-FC-A-0161-01
KAIG3-RFI-MB-A-0133 00 KAIG3-RFI-MB-A-0133-00
KAIG3-RFI-MB-LC-0164 00 KAIG3-RFI-MB-LC-0164-00
KAIG3-RFI-MB-LC-0163 00 KAIG3-RFI-MB-LC-0163-00
KAIG3-RFI-MB-LC-0162 00 KAIG3-RFI-MB-LC-0162-00
KAIG3-RFI-CO-S-3206 00 KAIG3-RFI-CO-S-3206-00
KAIG3-RFI-CO-S-3205 00 KAIG3-RFI-CO-S-3205-00
KAIG3-RFI-PG-LS-0355 00 KAIG3-RFI-PG-LS-0355-00
KAIG3-RFI-ZG-S-3192 00 KAIG3-RFI-ZG-S-3192-00
KAIG3-RFI-ZG-S-3191 00 KAIG3-RFI-ZG-S-3191-00
KAIG3-RFI-WG-A-0446 00 KAIG3-RFI-WG-A-0446-00
KAIG3-RFI-AG-S-3190 00 KAIG3-RFI-AG-S-3190-00
KAIG3-RFI-WG-SU-1397 00 KAIG3-RFI-WG-SU-1397-00
KAIG3-RFI-WG-S-3189 00 KAIG3-RFI-WG-S-3189-00
KAIG3-RFI-WG-S-3188 00 KAIG3-RFI-WG-S-3188-00
KAIG3-RFI-MB-P-0124 00 KAIG3-RFI-MB-P-0124-00
KAIG3-RFI-CO-SU-1399 00 KAIG3-RFI-CO-SU-1399-00
KAIG3-RFI-CO-SU-1398 00 KAIG3-RFI-CO-SU-1398-00
KAIG3-RFI-CO-S-3204 00 KAIG3-RFI-CO-S-3204-00
KAIG3-RFI-CO-S-3203 00 KAIG3-RFI-CO-S-3203-00
KAIG3-RFI-CO-S-3202 00 KAIG3-RFI-CO-S-3202-00
KAIG3-RFI-CO-S-3195 00 KAIG3-RFI-CO-S-3195-00
KAIG3-RFI-DG-C-0122 00 KAIG3-RFI-DG-C-0122-00
KAIG3-RFI-CO-S-3194 00 KAIG3-RFI-CO-S-3194-00
KAIG3-RFI-CO-S-3193 00 KAIG3-RFI-CO-S-3193-00
KAIG3-RFI-TG-C-0121 00 KAIG3-RFI-TG-C-0121-00
KAIG3-RFI-SW-LS-0356 00 KAIG3-RFI-SW-LS-0356-00
KAIG3-RFI-PA-S-3187 00 KAIG3-RFI-PA-S-3187-00
KAIG3-RFI-PA-S-3186 00 KAIG3-RFI-PA-S-3186-00
KAIG3-RFI-PA-S-3185 00 KAIG3-RFI-PA-S-3185-00
KAIG3-RFI-PA-S-3184 00 KAIG3-RFI-PA-S-3184-00
KAIG3-RFI-PA-S-3183 00 KAIG3-RFI-PA-S-3183-00
KAIG3-RFI-PA-S-3182 00 KAIG3-RFI-PA-S-3182-00
KAIG3-RFI-PA-S-3181 00 KAIG3-RFI-PA-S-3181-00
KAIG3-RFI-PA-S-3161 00 KAIG3-RFI-PA-S-3161-00
KAIG3-RFI-SW-S-2961 01 KAIG3-RFI-SW-S-2961-01
KAIG3-RFI-SW-S-2960 01 KAIG3-RFI-SW-S-2960-01
KAIG3-RFI-SW-C-0125 00 KAIG3-RFI-SW-C-0125-00
KAIG3-RFI-PG-S-3167 00 KAIG3-RFI-PG-S-3167-00
KAIG3-RFI-AG-SU-1393 00 KAIG3-RFI-AG-SU-1393-00
KAIG3-RFI-SW-S-3166 00 KAIG3-RFI-SW-S-3166-00
KAIG3-RFI-SW-S-3165 00 KAIG3-RFI-SW-S-3165-00
KAIG3-RFI-SW-S-3164 00 KAIG3-RFI-SW-S-3164-00
KAIG3-RFI-ZG-LS-0353 00 KAIG3-RFI-ZG-LS-0353-00
KAIG3-RFI-ZG-S-3154 00 KAIG3-RFI-ZG-S-3154-00
KAIG3-RFI-ZG-S-3153 00 KAIG3-RFI-ZG-S-3153-00
KAIG3-RFI-SW-A-0443 00 KAIG3-RFI-SW-A-0443-00
KAIG3-RFI-CO-S-3180 00 KAIG3-RFI-CO-S-3180-00
KAIG3-RFI-CO-S-3179 00 KAIG3-RFI-CO-S-3179-00
KAIG3-RFI-CO-S-3178 00 KAIG3-RFI-CO-S-3178-00
KAIG3-RFI-CO-S-3177 00 KAIG3-RFI-CO-S-3177-00
KAIG3-RFI-CO-S-3171 00 KAIG3-RFI-CO-S-3171-00
KAIG3-RFI-CO-S-3170 00 KAIG3-RFI-CO-S-3170-00
KAIG3-RFI-CO-S-3169 00 KAIG3-RFI-CO-S-3169-00
KAIG3-RFI-CO-S-3168 00 KAIG3-RFI-CO-S-3168-00
KAIG3-RFI-CO-SU-1396 00 KAIG3-RFI-CO-SU-1396-00
KAIG3-RFI-CO-SU-1395 00 KAIG3-RFI-CO-SU-1395-00
KAIG3-RFI-CO-SU-1394 00 KAIG3-RFI-CO-SU-1394-00
KAIG3-RFI-SW-A-0442 00 KAIG3-RFI-SW-A-0442-00
KAIG3-RFI-SW-LS-0352 01 KAIG3-RFI-SW-LS-0352-01
KAIG3-RFI-PA-S-3061 01 KAIG3-RFI-PA-S-3061-01
KAIG3-RFI-PA-S-2826 01 KAIG3-RFI-PA-S-2826-01
KAIG3-RFI-PA-S-3176 00 KAIG3-RFI-PA-S-3176-00
KAIG3-RFI-PA-S-3175 00 KAIG3-RFI-PA-S-3175-00
KAIG3-RFI-PA-S-3174 00 KAIG3-RFI-PA-S-3174-00
KAIG3-RFI-PA-S-3173 00 KAIG3-RFI-PA-S-3173-00
KAIG3-RFI-PA-S-3172 00 KAIG3-RFI-PA-S-3172-00
KAIG3-RFI-PA-S-3162 00 KAIG3-RFI-PA-S-3162-00
KAIG3-RFI-PA-S-3160 00 KAIG3-RFI-PA-S-3160-00
KAIG3-RFI-PA-S-3159 00 KAIG3-RFI-PA-S-3159-00
KAIG3-RFI-SW-S-3158 00 KAIG3-RFI-SW-S-3158-00
KAIG3-RFI-PA-S-3157 00 KAIG3-RFI-PA-S-3157-00
KAIG3-RFI-PA-S-3156 00 KAIG3-RFI-PA-S-3156-00
KAIG3-RFI-PA-S-3155 00 KAIG3-RFI-PA-S-3155-00
KAIG3-RFI-CO-S-2834 00 KAIG3-RFI-CO-S-2834-00
KAIG3-RFI-CO-S-2615 00 KAIG3-RFI-CO-S-2615-00
KAIG3-RFI-WG-S-3152 00 KAIG3-RFI-WG-S-3152-00
KAIG3-RFI-WG-SU-1392 00 KAIG3-RFI-WG-SU-1392-00
KAIG3-RFI-SW-A-0441 00 KAIG3-RFI-SW-A-0441-00
KAIG3-RFI-SW-S-2962 01 KAIG3-RFI-SW-S-2962-01
KAIG3-RFI-SW-C-0120 00 KAIG3-RFI-SW-C-0120-00
KAIG3-RFI-SW-LS-0230 01 KAIG3-RFI-SW-LS-0230-01
KAIG3-RFI-SW-S-3150 00 KAIG3-RFI-SW-S-3150-00
KAIG3-RFI-PA-S-3149 00 KAIG3-RFI-PA-S-3149-00
KAIG3-RFI-PA-S-3148 00 KAIG3-RFI-PA-S-3148-00
KAIG3-RFI-PA-S-3144 00 KAIG3-RFI-PA-S-3144-00
KAIG3-RFI-PA-S-3143 00 KAIG3-RFI-PA-S-3143-00
KAIG3-RFI-PA-S-3142 00 KAIG3-RFI-PA-S-3142-00
KAIG3-RFI-PA-S-3141 00 KAIG3-RFI-PA-S-3141-00
KAIG3-RFI-PA-S-3140 00 KAIG3-RFI-PA-S-3140-00
KAIG3-RFI-SW-E-0173 00 KAIG3-RFI-SW-E-0173-00
KAIG3-RFI-CO-S-3151 00 KAIG3-RFI-CO-S-3151-00
KAIG3-RFI-CO-S-3147 00 KAIG3-RFI-CO-S-3147-00
KAIG3-RFI-CO-S-3145 00 KAIG3-RFI-CO-S-3145-00
KAIG3-RFI-CO-SU-1391 00 KAIG3-RFI-CO-SU-1391-00
KAIG3-RFI-CO-S-3146 00 KAIG3-RFI-CO-S-3146-00
KAIG3-RFI-SW-C-0118 00 KAIG3-RFI-SW-C-0118-00
KAIG3-RFI-SW-C-0117 00 KAIG3-RFI-SW-C-0117-00
KAIG3-RFI-SW-P-0119 00 KAIG3-RFI-SW-P-0119-00
KAIG3-RFI-PA-S-3139 00 KAIG3-RFI-PA-S-3139-00
KAIG3-RFI-PA-S-3138 00 KAIG3-RFI-PA-S-3138-00
KAIG3-RFI-PA-S-3137 00 KAIG3-RFI-PA-S-3137-00
KAIG3-RFI-SW-S-3134 00 KAIG3-RFI-SW-S-3134-00
KAIG3-RFI-PA-S-3133 00 KAIG3-RFI-PA-S-3133-00
KAIG3-RFI-PA-S-3132 00 KAIG3-RFI-PA-S-3132-00
KAIG3-RFI-PA-S-3131 00 KAIG3-RFI-PA-S-3131-00
KAIG3-RFI-SW-S-3130 00 KAIG3-RFI-SW-S-3130-00
KAIG3-RFI-CO-SU-1390 00 KAIG3-RFI-CO-SU-1390-00
KAIG3-RFI-CO-SU-1389 00 KAIG3-RFI-CO-SU-1389-00
KAIG3-RFI-CO-S-3136 00 KAIG3-RFI-CO-S-3136-00
KAIG3-RFI-MB-A-0440 00 KAIG3-RFI-MB-A-0440-00
KAIG3-RFI-AG-S-3135 00 KAIG3-RFI-AG-S-3135-00
KAIG3-RFI-WG-S-3122 00 KAIG3-RFI-WG-S-3122-00
KAIG3-RFI-WG-S-3121 00 KAIG3-RFI-WG-S-3121-00
KAIG3-RFI-WG-SU-1386 00 KAIG3-RFI-WG-SU-1386-00
KAIG3-RFI-PA-S-3101 00 KAIG3-RFI-PA-S-3101-00
KAIG3-RFI-SW-S-3045 00 KAIG3-RFI-SW-S-3045-00
KAIG3-RFI-SW-LS-0352 00 KAIG3-RFI-SW-LS-0352-00
KAIG3-RFI-SW-LS-0351 00 KAIG3-RFI-SW-LS-0351-00
KAIG3-RFI-SW-LS-0350 00 KAIG3-RFI-SW-LS-0350-00
KAIG3-RFI-PA-S-3128 00 KAIG3-RFI-PA-S-3128-00
KAIG3-RFI-PA-S-3127 00 KAIG3-RFI-PA-S-3127-00
KAIG3-RFI-PA-S-3126 00 KAIG3-RFI-PA-S-3126-00
KAIG3-RFI-PA-S-3125 00 KAIG3-RFI-PA-S-3125-00
KAIG3-RFI-PA-S-3124 00 KAIG3-RFI-PA-S-3124-00
KAIG3-RFI-PA-S-3123 00 KAIG3-RFI-PA-S-3123-00
KAIG3-RFI-PA-S-3118 00 KAIG3-RFI-PA-S-3118-00
KAIG3-RFI-PA-S-3117 00 KAIG3-RFI-PA-S-3117-00
KAIG3-RFI-PA-S-3116 00 KAIG3-RFI-PA-S-3116-00
KAIG3-RFI-PA-S-3115 00 KAIG3-RFI-PA-S-3115-00
KAIG3-RFI-PA-S-3114 00 KAIG3-RFI-PA-S-3114-00
KAIG3-RFI-CO-S-3129 00 KAIG3-RFI-CO-S-3129-00
KAIG3-RFI-CO-S-3106 00 KAIG3-RFI-CO-S-3106-00
KAIG3-RFI-CO-S-3105 00 KAIG3-RFI-CO-S-3105-00
KAIG3-RFI-CO-SU-1388 00 KAIG3-RFI-CO-SU-1388-00
KAIG3-RFI-CO-SU-1387 00 KAIG3-RFI-CO-SU-1387-00
KAIG3-RFI-WG-S-3120 00 KAIG3-RFI-WG-S-3120-00
KAIG3-RFI-WG-S-3119 00 KAIG3-RFI-WG-S-3119-00
KAIG3-RFI-WG-SU-1385 00 KAIG3-RFI-WG-SU-1385-00
KAIG3-RFI-WG-S-3113 00 KAIG3-RFI-WG-S-3113-00
KAIG3-RFI-WG-S-3112 00 KAIG3-RFI-WG-S-3112-00
KAIG3-RFI-DG-S-3111 00 KAIG3-RFI-DG-S-3111-00
KAIG3-RFI-TG-S-3110 00 KAIG3-RFI-TG-S-3110-00
KAIG3-RFI-SW-C-0116 00 KAIG3-RFI-SW-C-0116-00
KAIG3-RFI-SW-S-3055 01 KAIG3-RFI-SW-S-3055-01
KAIG3-RFI-SW-LS-0349 00 KAIG3-RFI-SW-LS-0349-00
KAIG3-RFI-PA-S-3109 00 KAIG3-RFI-PA-S-3109-00
KAIG3-RFI-PA-S-3108 00 KAIG3-RFI-PA-S-3108-00
KAIG3-RFI-PA-S-3107 00 KAIG3-RFI-PA-S-3107-00
KAIG3-RFI-PA-S-3104 00 KAIG3-RFI-PA-S-3104-00
KAIG3-RFI-PA-S-3103 00 KAIG3-RFI-PA-S-3103-00
KAIG3-RFI-PA-S-3102 00 KAIG3-RFI-PA-S-3102-00
KAIG3-RFI-SW-S-3046 00 KAIG3-RFI-SW-S-3046-00
KAIG3-RFI-SW-S-2982 00 KAIG3-RFI-SW-S-2982-00
KAIG3-RFI-WG-S-3100 00 KAIG3-RFI-WG-S-3100-00
KAIG3-RFI-WG-A-0439 00 KAIG3-RFI-WG-A-0439-00
KAIG3-RFI-WG-S-3099 00 KAIG3-RFI-WG-S-3099-00
KAIG3-RFI-WG-S-3098 00 KAIG3-RFI-WG-S-3098-00
KAIG3-RFI-WG-S-3097 00 KAIG3-RFI-WG-S-3097-00
KAIG3-RFI-WG-S-3096 00 KAIG3-RFI-WG-S-3096-00
KAIG3-RFI-WG-S-3095 00 KAIG3-RFI-WG-S-3095-00
KAIG3-RFI-MB-M-0115 00 KAIG3-RFI-MB-M-0115-00
KAIG3-RFI-SW-C-0114 00 KAIG3-RFI-SW-C-0114-00
KAIG3-RFI-SW-C-0113 00 KAIG3-RFI-SW-C-0113-00
KAIG3-RFI-SW-C-0112 00 KAIG3-RFI-SW-C-0112-00
KAIG3-RFI-SW-P-0102 01 KAIG3-RFI-SW-P-0102-01
KAIG3-RFI-WG-SU-1361 01 KAIG3-RFI-WG-SU-1361-01
KAIG3-RFI-WG-SU-1360 01 KAIG3-RFI-WG-SU-1360-01
KAIG3-RFI-WG-SU-1376 01 KAIG3-RFI-WG-SU-1376-01
KAIG3-RFI-WG-SU-1375 01 KAIG3-RFI-WG-SU-1375-01
KAIG3-RFI-WG-LS-0348 00 KAIG3-RFI-WG-LS-0348-00
KAIG3-RFI-WG-S-3090 00 KAIG3-RFI-WG-S-3090-00
KAIG3-RFI-WG-S-3088 00 KAIG3-RFI-WG-S-3088-00
KAIG3-RFI-WG-S-3089 00 KAIG3-RFI-WG-S-3089-00
KAIG3-RFI-WG-SU-1384 00 KAIG3-RFI-WG-SU-1384-00
KAIG3-RFI-WG-S-3087 00 KAIG3-RFI-WG-S-3087-00
KAIG3-RFI-WG-S-3086 00 KAIG3-RFI-WG-S-3086-00
KAIG3-RFI-WG-SU-1383 00 KAIG3-RFI-WG-SU-1383-00
KAIG3-RFI-PG-S-2661 01 KAIG3-RFI-PG-S-2661-01
KAIG3-RFI-PG-LS-0340 01 KAIG3-RFI-PG-LS-0340-01
KAIG3-RFI-SW-A-0427 01 KAIG3-RFI-SW-A-0427-01
KAIG3-RFI-WG-S-3085 00 KAIG3-RFI-WG-S-3085-00
KAIG3-RFI-WG-S-3084 00 KAIG3-RFI-WG-S-3084-00
KAIG3-RFI-SW-A-0426 01 KAIG3-RFI-SW-A-0426-01
KAIG3-RFI-SW-A-0438 00 KAIG3-RFI-SW-A-0438-00
KAIG3-RFI-SW-S-3083 00 KAIG3-RFI-SW-S-3083-00
KAIG3-RFI-CO-SU-1379 00 KAIG3-RFI-CO-SU-1379-00
KAIG3-RFI-CO-S-3094 00 KAIG3-RFI-CO-S-3094-00
KAIG3-RFI-PA-S-3093 00 KAIG3-RFI-PA-S-3093-00
KAIG3-RFI-PA-S-3092 00 KAIG3-RFI-PA-S-3092-00
KAIG3-RFI-PA-S-3091 00 KAIG3-RFI-PA-S-3091-00
KAIG3-RFI-PA-S-3082 00 KAIG3-RFI-PA-S-3082-00
KAIG3-RFI-PA-S-3081 00 KAIG3-RFI-PA-S-3081-00
KAIG3-RFI-PA-S-3080 00 KAIG3-RFI-PA-S-3080-00
KAIG3-RFI-PA-S-3079 00 KAIG3-RFI-PA-S-3079-00
KAIG3-RFI-SW-C-0109 00 KAIG3-RFI-SW-C-0109-00
KAIG3-RFI-WG-S-3054 00 KAIG3-RFI-WG-S-3054-00
KAIG3-RFI-TG-SU-1382 00 KAIG3-RFI-TG-SU-1382-00
KAIG3-RFI-DG-SU-1381 00 KAIG3-RFI-DG-SU-1381-00
KAIG3-RFI-CO-S-3076 00 KAIG3-RFI-CO-S-3076-00
KAIG3-RFI-CO-S-3074 00 KAIG3-RFI-CO-S-3074-00
KAIG3-RFI-PA-S-3078 00 KAIG3-RFI-PA-S-3078-00
KAIG3-RFI-PA-S-3077 00 KAIG3-RFI-PA-S-3077-00
KAIG3-RFI-CO-S-3073 00 KAIG3-RFI-CO-S-3073-00
KAIG3-RFI-CO-S-3072 00 KAIG3-RFI-CO-S-3072-00
KAIG3-RFI-SW-LS-0347 00 KAIG3-RFI-SW-LS-0347-00
KAIG3-RFI-CO-S-3003 00 KAIG3-RFI-CO-S-3003-00
KAIG3-RFI-PA-S-3075 00 KAIG3-RFI-PA-S-3075-00
KAIG3-RFI-PA-S-3068 00 KAIG3-RFI-PA-S-3068-00
KAIG3-RFI-PA-S-3067 00 KAIG3-RFI-PA-S-3067-00
KAIG3-RFI-PA-S-3066 00 KAIG3-RFI-PA-S-3066-00
KAIG3-RFI-CO-S-3071 00 KAIG3-RFI-CO-S-3071-00
KAIG3-RFI-PA-S-3065 00 KAIG3-RFI-PA-S-3065-00
KAIG3-RFI-PA-S-3064 00 KAIG3-RFI-PA-S-3064-00
KAIG3-RFI-PA-S-3063 00 KAIG3-RFI-PA-S-3063-00
KAIG3-RFI-PA-S-3062 00 KAIG3-RFI-PA-S-3062-00
KAIG3-RFI-CO-S-3069 00 KAIG3-RFI-CO-S-3069-00
KAIG3-RFI-CO-S-3070 00 KAIG3-RFI-CO-S-3070-00
KAIG3-RFI-CO-SU-1380 00 KAIG3-RFI-CO-SU-1380-00
KAIG3-RFI-CO-SU-1365 00 KAIG3-RFI-CO-SU-1365-00
KAIG3-RFI-MB-P-0096 00 KAIG3-RFI-MB-P-0096-00
KAIG3-RFI-CO-SU-1378 00 KAIG3-RFI-CO-SU-1378-00
KAIG3-RFI-PA-S-3052 00 KAIG3-RFI-PA-S-3052-00
KAIG3-RFI-PG-C-0108 00 KAIG3-RFI-PG-C-0108-00
KAIG3-RFI-WG-A-0437 00 KAIG3-RFI-WG-A-0437-00
KAIG3-RFI-WG-S-3053 00 KAIG3-RFI-WG-S-3053-00
KAIG3-RFI-WG-SU-1377 00 KAIG3-RFI-WG-SU-1377-00
KAIG3-RFI-PA-S-3051 00 KAIG3-RFI-PA-S-3051-00
KAIG3-RFI-SW-LS-0328 01 KAIG3-RFI-SW-LS-0328-01
KAIG3-RFI-SW-LS-0346 00 KAIG3-RFI-SW-LS-0346-00
KAIG3-RFI-PA-S-3061 00 KAIG3-RFI-PA-S-3061-00
KAIG3-RFI-PA-S-3060 00 KAIG3-RFI-PA-S-3060-00
KAIG3-RFI-PA-S-3059 00 KAIG3-RFI-PA-S-3059-00
KAIG3-RFI-SW-S-3055 00 KAIG3-RFI-SW-S-3055-00
KAIG3-RFI-PA-S-3044 00 KAIG3-RFI-PA-S-3044-00
KAIG3-RFI-CO-S-3058 00 KAIG3-RFI-CO-S-3058-00
KAIG3-RFI-CO-S-3057 00 KAIG3-RFI-CO-S-3057-00
KAIG3-RFI-CO-S-3056 00 KAIG3-RFI-CO-S-3056-00
KAIG3-RFI-CO-S-3017 00 KAIG3-RFI-CO-S-3017-00
KAIG3-RFI-SW-C-0107 00 KAIG3-RFI-SW-C-0107-00
KAIG3-RFI-SW-C-0106 00 KAIG3-RFI-SW-C-0106-00
KAIG3-RFI-PA-S-3050 00 KAIG3-RFI-PA-S-3050-00
KAIG3-RFI-PA-S-3043 00 KAIG3-RFI-PA-S-3043-00
KAIG3-RFI-PA-S-3042 00 KAIG3-RFI-PA-S-3042-00
KAIG3-RFI-PA-S-3041 00 KAIG3-RFI-PA-S-3041-00
KAIG3-RFI-PA-LS-0325 01 KAIG3-RFI-PA-LS-0325-01
KAIG3-RFI-PG-S-3049 00 KAIG3-RFI-PG-S-3049-00
KAIG3-RFI-CO-SU-1332 01 KAIG3-RFI-CO-SU-1332-01
KAIG3-RFI-CO-S-3016 00 KAIG3-RFI-CO-S-3016-00
KAIG3-RFI-CO-S-3047 00 KAIG3-RFI-CO-S-3047-00
KAIG3-RFI-CO-S-3048 00 KAIG3-RFI-CO-S-3048-00
KAIG3-RFI-AG-S-2749 00 KAIG3-RFI-AG-S-2749-00
KAIG3-RFI-AG-S-2747 00 KAIG3-RFI-AG-S-2747-00
KAIG3-RFI-CO-C-0103 00 KAIG3-RFI-CO-C-0103-00
KAIG3-RFI-SW-C-0105 00 KAIG3-RFI-SW-C-0105-00
KAIG3-RFI-SW-C-0104 00 KAIG3-RFI-SW-C-0104-00
KAIG3-RFI-ZG-LS-0345 00 KAIG3-RFI-ZG-LS-0345-00
KAIG3-RFI-PG-LS-0344 00 KAIG3-RFI-PG-LS-0344-00
KAIG3-RFI-WG-S-3040 00 KAIG3-RFI-WG-S-3040-00
KAIG3-RFI-WG-SU-1376 00 KAIG3-RFI-WG-SU-1376-00
KAIG3-RFI-WG-S-3039 00 KAIG3-RFI-WG-S-3039-00
KAIG3-RFI-WG-SU-1375 00 KAIG3-RFI-WG-SU-1375-00
KAIG3-RFI-SW-SU-1374 00 KAIG3-RFI-SW-SU-1374-00
KAIG3-RFI-PA-S-3036 00 KAIG3-RFI-PA-S-3036-00
KAIG3-RFI-PA-S-3035 00 KAIG3-RFI-PA-S-3035-00
KAIG3-RFI-PA-S-3034 00 KAIG3-RFI-PA-S-3034-00
KAIG3-RFI-PA-S-3033 00 KAIG3-RFI-PA-S-3033-00
KAIG3-RFI-PA-S-3024 00 KAIG3-RFI-PA-S-3024-00
KAIG3-RFI-PA-S-2761 01 KAIG3-RFI-PA-S-2761-01
KAIG3-RFI-CO-S-3038 00 KAIG3-RFI-CO-S-3038-00
KAIG3-RFI-CO-SU-1373 00 KAIG3-RFI-CO-SU-1373-00
KAIG3-RFI-SW-S-3037 00 KAIG3-RFI-SW-S-3037-00
KAIG3-RFI-PG-E-0172 00 KAIG3-RFI-PG-E-0172-00
KAIG3-RFI-MB-LC-0161 00 KAIG3-RFI-MB-LC-0161-00
KAIG3-RFI-MB-LC-0160 00 KAIG3-RFI-MB-LC-0160-00
KAIG3-RFI-MB-LC-0159 00 KAIG3-RFI-MB-LC-0159-00
KAIG3-RFI-SW-LS-0343 00 KAIG3-RFI-SW-LS-0343-00
KAIG3-RFI-SW-LS-0342 00 KAIG3-RFI-SW-LS-0342-00
KAIG3-RFI-SW-LS-0341 00 KAIG3-RFI-SW-LS-0341-00
KAIG3-RFI-PA-S-3025 00 KAIG3-RFI-PA-S-3025-00
KAIG3-RFI-PA-S-3023 00 KAIG3-RFI-PA-S-3023-00
KAIG3-RFI-PA-S-3022 00 KAIG3-RFI-PA-S-3022-00
KAIG3-RFI-PA-S-3021 00 KAIG3-RFI-PA-S-3021-00
KAIG3-RFI-PA-S-3020 00 KAIG3-RFI-PA-S-3020-00
KAIG3-RFI-SW-S-3019 00 KAIG3-RFI-SW-S-3019-00
KAIG3-RFI-PA-S-3018 00 KAIG3-RFI-PA-S-3018-00
KAIG3-RFI-CO-SU-1371 00 KAIG3-RFI-CO-SU-1371-00
KAIG3-RFI-CO-SU-1370 00 KAIG3-RFI-CO-SU-1370-00
KAIG3-RFI-CO-SU-1368 00 KAIG3-RFI-CO-SU-1368-00
KAIG3-RFI-CO-SU-1367 00 KAIG3-RFI-CO-SU-1367-00
KAIG3-RFI-CO-S-3031 00 KAIG3-RFI-CO-S-3031-00
KAIG3-RFI-CO-S-3030 00 KAIG3-RFI-CO-S-3030-00
KAIG3-RFI-CO-S-3029 00 KAIG3-RFI-CO-S-3029-00
KAIG3-RFI-CO-S-3028 00 KAIG3-RFI-CO-S-3028-00
KAIG3-RFI-SW-P-0102 00 KAIG3-RFI-SW-P-0102-00
KAIG3-RFI-CO-S-3027 00 KAIG3-RFI-CO-S-3027-00
KAIG3-RFI-WG-S-3000 00 KAIG3-RFI-WG-S-3000-00
KAIG3-RFI-WG-S-2999 00 KAIG3-RFI-WG-S-2999-00
KAIG3-RFI-WG-S-2998 00 KAIG3-RFI-WG-S-2998-00
KAIG3-RFI-WG-S-2993 00 KAIG3-RFI-WG-S-2993-00
KAIG3-RFI-WG-S-2992 00 KAIG3-RFI-WG-S-2992-00
KAIG3-RFI-WG-S-2991 00 KAIG3-RFI-WG-S-2991-00
KAIG3-RFI-WG-S-2990 00 KAIG3-RFI-WG-S-2990-00
KAIG3-RFI-WG-S-3002 00 KAIG3-RFI-WG-S-3002-00
KAIG3-RFI-WG-S-3001 00 KAIG3-RFI-WG-S-3001-00
KAIG3-RFI-WG-S-2997 00 KAIG3-RFI-WG-S-2997-00
KAIG3-RFI-WG-S-2996 00 KAIG3-RFI-WG-S-2996-00
KAIG3-RFI-WG-S-2995 00 KAIG3-RFI-WG-S-2995-00
KAIG3-RFI-WG-S-2994 00 KAIG3-RFI-WG-S-2994-00
KAIG3-RFI-WG-S-2989 00 KAIG3-RFI-WG-S-2989-00
KAIG3-RFI-WG-S-2988 00 KAIG3-RFI-WG-S-2988-00
KAIG3-RFI-WG-S-2987 00 KAIG3-RFI-WG-S-2987-00
KAIG3-RFI-AG-SU-1362 00 KAIG3-RFI-AG-SU-1362-00
KAIG3-RFI-AG-S-2986 00 KAIG3-RFI-AG-S-2986-00
KAIG3-RFI-WG-SU-1361 00 KAIG3-RFI-WG-SU-1361-00
KAIG3-RFI-WG-S-2985 00 KAIG3-RFI-WG-S-2985-00
KAIG3-RFI-WG-S-2984 00 KAIG3-RFI-WG-S-2984-00
KAIG3-RFI-WG-S-2983 00 KAIG3-RFI-WG-S-2983-00
KAIG3-RFI-WG-SU-1360 00 KAIG3-RFI-WG-SU-1360-00
KAIG3-RFI-WG-S-2981 00 KAIG3-RFI-WG-S-2981-00
KAIG3-RFI-CO-SU-1364 00 KAIG3-RFI-CO-SU-1364-00
KAIG3-RFI-CO-SU-1363 00 KAIG3-RFI-CO-SU-1363-00
KAIG3-RFI-CO-S-3015 00 KAIG3-RFI-CO-S-3015-00
KAIG3-RFI-CO-S-3014 00 KAIG3-RFI-CO-S-3014-00
KAIG3-RFI-CO-S-2975 00 KAIG3-RFI-CO-S-2975-00
KAIG3-RFI-CO-S-2974 00 KAIG3-RFI-CO-S-2974-00
KAIG3-RFI-PA-S-3013 00 KAIG3-RFI-PA-S-3013-00
KAIG3-RFI-SM-P-0101 00 KAIG3-RFI-SM-P-0101-00
KAIG3-RFI-PA-S-3012 00 KAIG3-RFI-PA-S-3012-00
KAIG3-RFI-PA-S-3011 00 KAIG3-RFI-PA-S-3011-00
KAIG3-RFI-PA-S-3010 00 KAIG3-RFI-PA-S-3010-00
KAIG3-RFI-PA-S-3009 00 KAIG3-RFI-PA-S-3009-00
KAIG3-RFI-PA-S-3008 00 KAIG3-RFI-PA-S-3008-00
KAIG3-RFI-PA-S-3007 00 KAIG3-RFI-PA-S-3007-00
KAIG3-RFI-CO-S-2576 00 KAIG3-RFI-CO-S-2576-00
KAIG3-RFI-PG-SU-1358 00 KAIG3-RFI-PG-SU-1358-00
KAIG3-RFI-SW-S-2981 00 KAIG3-RFI-SW-S-2981-00
KAIG3-RFI-PA-S-2980 00 KAIG3-RFI-PA-S-2980-00
KAIG3-RFI-PA-S-2979 00 KAIG3-RFI-PA-S-2979-00
KAIG3-RFI-PA-S-2978 00 KAIG3-RFI-PA-S-2978-00
KAIG3-RFI-PA-S-2977 00 KAIG3-RFI-PA-S-2977-00
KAIG3-RFI-PA-S-2976 00 KAIG3-RFI-PA-S-2976-00
KAIG3-RFI-PA-S-2970 00 KAIG3-RFI-PA-S-2970-00
KAIG3-RFI-PA-S-2969 00 KAIG3-RFI-PA-S-2969-00
KAIG3-RFI-PA-S-2968 00 KAIG3-RFI-PA-S-2968-00
KAIG3-RFI-PA-S-2967 00 KAIG3-RFI-PA-S-2967-00
KAIG3-RFI-PA-S-2966 00 KAIG3-RFI-PA-S-2966-00
KAIG3-RFI-CO-S-2973 00 KAIG3-RFI-CO-S-2973-00
KAIG3-RFI-CO-S-2972 00 KAIG3-RFI-CO-S-2972-00
KAIG3-RFI-CO-S-2971 00 KAIG3-RFI-CO-S-2971-00
KAIG3-RFI-CO-SU-1359 00 KAIG3-RFI-CO-SU-1359-00
KAIG3-RFI-PG-LC-0158 00 KAIG3-RFI-PG-LC-0158-00
KAIG3-RFI-PG-LC-0157 00 KAIG3-RFI-PG-LC-0157-00
KAIG3-RFI-PG-LC-0156 00 KAIG3-RFI-PG-LC-0156-00
KAIG3-RFI-PG-E-0171 00 KAIG3-RFI-PG-E-0171-00
KAIG3-RFI-CO-S-2965 00 KAIG3-RFI-CO-S-2965-00
KAIG3-RFI-CO-S-2964 00 KAIG3-RFI-CO-S-2964-00
KAIG3-RFI-CO-S-2963 00 KAIG3-RFI-CO-S-2963-00
KAIG3-RFI-CO-S-2954 00 KAIG3-RFI-CO-S-2954-00
KAIG3-RFI-CO-S-2955 00 KAIG3-RFI-CO-S-2955-00
KAIG3-RFI-CO-S-2932 00 KAIG3-RFI-CO-S-2932-00
KAIG3-RFI-CO-S-2931 00 KAIG3-RFI-CO-S-2931-00
KAIG3-RFI-CO-S-2930 00 KAIG3-RFI-CO-S-2930-00
KAIG3-RFI-WG-A-0436 00 KAIG3-RFI-WG-A-0436-00
KAIG3-RFI-SW-S-2620 01 KAIG3-RFI-SW-S-2620-01
KAIG3-RFI-SW-LS-0332 01 KAIG3-RFI-SW-LS-0332-01
KAIG3-RFI-SW-LS-0329 01 KAIG3-RFI-SW-LS-0329-01
KAIG3-RFI-WG-S-2950 00 KAIG3-RFI-WG-S-2950-00
KAIG3-RFI-PA-S-2959 00 KAIG3-RFI-PA-S-2959-00
KAIG3-RFI-WG-SU-1355 00 KAIG3-RFI-WG-SU-1355-00
KAIG3-RFI-PA-S-2958 00 KAIG3-RFI-PA-S-2958-00
KAIG3-RFI-WG-SU-1354 00 KAIG3-RFI-WG-SU-1354-00
KAIG3-RFI-WG-SU-1353 00 KAIG3-RFI-WG-SU-1353-00
KAIG3-RFI-PA-S-2957 00 KAIG3-RFI-PA-S-2957-00
KAIG3-RFI-WG-S-2949 00 KAIG3-RFI-WG-S-2949-00
KAIG3-RFI-CO-S-2929 00 KAIG3-RFI-CO-S-2929-00
KAIG3-RFI-WG-S-2948 00 KAIG3-RFI-WG-S-2948-00
KAIG3-RFI-PA-S-2956 00 KAIG3-RFI-PA-S-2956-00
KAIG3-RFI-CO-S-2928 00 KAIG3-RFI-CO-S-2928-00
KAIG3-RFI-SW-A-0435 00 KAIG3-RFI-SW-A-0435-00
KAIG3-RFI-PA-S-2946 00 KAIG3-RFI-PA-S-2946-00
KAIG3-RFI-SW-A-0434 00 KAIG3-RFI-SW-A-0434-00
KAIG3-RFI-PA-S-2945 00 KAIG3-RFI-PA-S-2945-00
KAIG3-RFI-CO-S-2927 00 KAIG3-RFI-CO-S-2927-00
KAIG3-RFI-AG-S-2947 00 KAIG3-RFI-AG-S-2947-00
KAIG3-RFI-PA-S-2944 00 KAIG3-RFI-PA-S-2944-00
KAIG3-RFI-CO-SU-1357 00 KAIG3-RFI-CO-SU-1357-00
KAIG3-RFI-PA-S-2943 00 KAIG3-RFI-PA-S-2943-00
KAIG3-RFI-PA-S-2942 00 KAIG3-RFI-PA-S-2942-00
KAIG3-RFI-PA-S-2941 00 KAIG3-RFI-PA-S-2941-00
KAIG3-RFI-CO-SU-1352 00 KAIG3-RFI-CO-SU-1352-00
KAIG3-RFI-CO-SU-1356 00 KAIG3-RFI-CO-SU-1356-00
KAIG3-RFI-CO-SU-1351 00 KAIG3-RFI-CO-SU-1351-00
KAIG3-RFI-MB-LC-0155 00 KAIG3-RFI-MB-LC-0155-00
KAIG3-RFI-MB-LC-0154 00 KAIG3-RFI-MB-LC-0154-00
KAIG3-RFI-MB-LC-0153 00 KAIG3-RFI-MB-LC-0153-00
KAIG3-RFI-SW-S-2962 00 KAIG3-RFI-SW-S-2962-00
KAIG3-RFI-SW-S-2961 00 KAIG3-RFI-SW-S-2961-00
KAIG3-RFI-SW-S-2960 00 KAIG3-RFI-SW-S-2960-00
KAIG3-RFI-PG-C-0100 00 KAIG3-RFI-PG-C-0100-00
KAIG3-RFI-WG-SU-1350 00 KAIG3-RFI-WG-SU-1350-00
KAIG3-RFI-MB-S-2925 00 KAIG3-RFI-MB-S-2925-00
KAIG3-RFI-MB-S-2924 00 KAIG3-RFI-MB-S-2924-00
KAIG3-RFI-MB-S-2923 00 KAIG3-RFI-MB-S-2923-00
KAIG3-RFI-WG-S-2922 00 KAIG3-RFI-WG-S-2922-00
KAIG3-RFI-PG-LS-0340 00 KAIG3-RFI-PG-LS-0340-00
KAIG3-RFI-WG-S-2921 00 KAIG3-RFI-WG-S-2921-00
KAIG3-RFI-CO-S-2940 00 KAIG3-RFI-CO-S-2940-00
KAIG3-RFI-PA-S-2939 00 KAIG3-RFI-PA-S-2939-00
KAIG3-RFI-PA-S-2938 00 KAIG3-RFI-PA-S-2938-00
KAIG3-RFI-PA-S-2937 00 KAIG3-RFI-PA-S-2937-00
KAIG3-RFI-PA-S-2936 00 KAIG3-RFI-PA-S-2936-00
KAIG3-RFI-PA-S-2935 00 KAIG3-RFI-PA-S-2935-00
KAIG3-RFI-PA-S-2934 00 KAIG3-RFI-PA-S-2934-00
KAIG3-RFI-PA-S-2933 00 KAIG3-RFI-PA-S-2933-00
KAIG3-RFI-PA-S-2920 00 KAIG3-RFI-PA-S-2920-00
KAIG3-RFI-SW-S-2919 00 KAIG3-RFI-SW-S-2919-00
KAIG3-RFI-PA-S-2918 00 KAIG3-RFI-PA-S-2918-00
KAIG3-RFI-PA-S-2917 00 KAIG3-RFI-PA-S-2917-00
KAIG3-RFI-PA-S-2916 00 KAIG3-RFI-PA-S-2916-00
KAIG3-RFI-PA-S-2915 00 KAIG3-RFI-PA-S-2915-00
KAIG3-RFI-PA-S-2868 00 KAIG3-RFI-PA-S-2868-00
KAIG3-RFI-CO-S-2926 00 KAIG3-RFI-CO-S-2926-00
KAIG3-RFI-CO-SU-1309 01 KAIG3-RFI-CO-SU-1309-01
KAIG3-RFI-SW-SU-1342 00 KAIG3-RFI-SW-SU-1342-00
KAIG3-RFI-PG-S-2908 00 KAIG3-RFI-PG-S-2908-00
KAIG3-RFI-TG-LS-0339 00 KAIG3-RFI-TG-LS-0339-00
KAIG3-RFI-WG-A-0433 00 KAIG3-RFI-WG-A-0433-00
KAIG3-RFI-WG-S-2907 00 KAIG3-RFI-WG-S-2907-00
KAIG3-RFI-SW-S-2914 00 KAIG3-RFI-SW-S-2914-00
KAIG3-RFI-PA-S-2913 00 KAIG3-RFI-PA-S-2913-00
KAIG3-RFI-PA-S-2912 00 KAIG3-RFI-PA-S-2912-00
KAIG3-RFI-PA-S-2911 00 KAIG3-RFI-PA-S-2911-00
KAIG3-RFI-PA-S-2910 00 KAIG3-RFI-PA-S-2910-00
KAIG3-RFI-PA-S-2909 00 KAIG3-RFI-PA-S-2909-00
KAIG3-RFI-PA-S-2906 00 KAIG3-RFI-PA-S-2906-00
KAIG3-RFI-PA-S-2905 00 KAIG3-RFI-PA-S-2905-00
KAIG3-RFI-PA-S-2904 00 KAIG3-RFI-PA-S-2904-00
KAIG3-RFI-PA-S-2902 00 KAIG3-RFI-PA-S-2902-00
KAIG3-RFI-PA-S-2901 00 KAIG3-RFI-PA-S-2901-00
KAIG3-RFI-SW-C-0099 00 KAIG3-RFI-SW-C-0099-00
KAIG3-RFI-CO-SU-1345 00 KAIG3-RFI-CO-SU-1345-00
KAIG3-RFI-CO-SU-1344 00 KAIG3-RFI-CO-SU-1344-00
KAIG3-RFI-CO-SU-1349 00 KAIG3-RFI-CO-SU-1349-00
KAIG3-RFI-SW-SU-1348 00 KAIG3-RFI-SW-SU-1348-00
KAIG3-RFI-SW-LS-0330 01 KAIG3-RFI-SW-LS-0330-01
KAIG3-RFI-PA-S-2900 00 KAIG3-RFI-PA-S-2900-00
KAIG3-RFI-PA-S-2899 00 KAIG3-RFI-PA-S-2899-00
KAIG3-RFI-PA-S-2898 00 KAIG3-RFI-PA-S-2898-00
KAIG3-RFI-PA-S-2897 00 KAIG3-RFI-PA-S-2897-00
KAIG3-RFI-PA-S-2895 00 KAIG3-RFI-PA-S-2895-00
KAIG3-RFI-PA-S-2894 00 KAIG3-RFI-PA-S-2894-00
KAIG3-RFI-PA-S-2893 00 KAIG3-RFI-PA-S-2893-00
KAIG3-RFI-PA-S-2892 00 KAIG3-RFI-PA-S-2892-00
KAIG3-RFI-PA-S-2891 00 KAIG3-RFI-PA-S-2891-00
KAIG3-RFI-PA-S-2890 00 KAIG3-RFI-PA-S-2890-00
KAIG3-RFI-PA-S-2889 00 KAIG3-RFI-PA-S-2889-00
KAIG3-RFI-PA-S-2888 00 KAIG3-RFI-PA-S-2888-00
KAIG3-RFI-PA-S-2867 00 KAIG3-RFI-PA-S-2867-00
KAIG3-RFI-PA-S-2866 00 KAIG3-RFI-PA-S-2866-00
KAIG3-RFI-PA-S-2865 00 KAIG3-RFI-PA-S-2865-00
KAIG3-RFI-PA-S-2852 00 KAIG3-RFI-PA-S-2852-00
KAIG3-RFI-PA-S-2849 00 KAIG3-RFI-PA-S-2849-00
KAIG3-RFI-PA-S-2848 00 KAIG3-RFI-PA-S-2848-00
KAIG3-RFI-PA-S-2847 00 KAIG3-RFI-PA-S-2847-00
KAIG3-RFI-PA-S-2846 00 KAIG3-RFI-PA-S-2846-00
KAIG3-RFI-PA-S-2817 01 KAIG3-RFI-PA-S-2817-01
KAIG3-RFI-CO-S-2880 00 KAIG3-RFI-CO-S-2880-00
KAIG3-RFI-CO-S-2879 00 KAIG3-RFI-CO-S-2879-00
KAIG3-RFI-CO-S-2878 00 KAIG3-RFI-CO-S-2878-00
KAIG3-RFI-CO-S-2877 00 KAIG3-RFI-CO-S-2877-00
KAIG3-RFI-CO-S-2876 00 KAIG3-RFI-CO-S-2876-00
KAIG3-RFI-PG-A-0432 00 KAIG3-RFI-PG-A-0432-00
KAIG3-RFI-CO-S-2875 00 KAIG3-RFI-CO-S-2875-00
KAIG3-RFI-WG-A-0431 00 KAIG3-RFI-WG-A-0431-00
KAIG3-RFI-WG-SU-1347 00 KAIG3-RFI-WG-SU-1347-00
KAIG3-RFI-CO-S-2874 00 KAIG3-RFI-CO-S-2874-00
KAIG3-RFI-WG-SU-1346 00 KAIG3-RFI-WG-SU-1346-00
KAIG3-RFI-WG-S-2887 00 KAIG3-RFI-WG-S-2887-00
KAIG3-RFI-CO-S-2873 00 KAIG3-RFI-CO-S-2873-00
KAIG3-RFI-WG-S-2886 00 KAIG3-RFI-WG-S-2886-00
KAIG3-RFI-WG-S-2885 00 KAIG3-RFI-WG-S-2885-00
KAIG3-RFI-WG-S-2884 00 KAIG3-RFI-WG-S-2884-00
KAIG3-RFI-CO-S-2872 00 KAIG3-RFI-CO-S-2872-00
KAIG3-RFI-WG-S-2883 00 KAIG3-RFI-WG-S-2883-00
KAIG3-RFI-CO-S-2871 00 KAIG3-RFI-CO-S-2871-00
KAIG3-RFI-CO-S-2870 00 KAIG3-RFI-CO-S-2870-00
KAIG3-RFI-CO-S-2869 00 KAIG3-RFI-CO-S-2869-00
KAIG3-RFI-WG-S-2882 00 KAIG3-RFI-WG-S-2882-00
KAIG3-RFI-WG-S-2881 00 KAIG3-RFI-WG-S-2881-00
KAIG3-RFI-PA-S-2864 00 KAIG3-RFI-PA-S-2864-00
KAIG3-RFI-SW-S-2896 00 KAIG3-RFI-SW-S-2896-00
KAIG3-RFI-CO-S-1220 00 KAIG3-RFI-CO-S-1220-00
KAIG3-RFI-CO-S-0360 00 KAIG3-RFI-CO-S-0360-00
KAIG3-RFI-CO-S-0359 01 KAIG3-RFI-CO-S-0359-01
KAIG3-RFI-MB-P-0098 00 KAIG3-RFI-MB-P-0098-00
KAIG3-RFI-MB-M-0097 00 KAIG3-RFI-MB-M-0097-00
KAIG3-RFI-SW-S-2863 00 KAIG3-RFI-SW-S-2863-00
KAIG3-RFI-PA-S-2862 00 KAIG3-RFI-PA-S-2862-00
KAIG3-RFI-PA-S-2851 00 KAIG3-RFI-PA-S-2851-00
KAIG3-RFI-PA-S-2850 00 KAIG3-RFI-PA-S-2850-00
KAIG3-RFI-CO-S-2861 00 KAIG3-RFI-CO-S-2861-00
KAIG3-RFI-CO-S-2860 00 KAIG3-RFI-CO-S-2860-00
KAIG3-RFI-CO-S-2859 00 KAIG3-RFI-CO-S-2859-00
KAIG3-RFI-CO-SU-1343 00 KAIG3-RFI-CO-SU-1343-00
KAIG3-RFI-PG-S-2858 00 KAIG3-RFI-PG-S-2858-00
KAIG3-RFI-PG-S-2857 00 KAIG3-RFI-PG-S-2857-00
KAIG3-RFI-PG-S-2856 00 KAIG3-RFI-PG-S-2856-00
KAIG3-RFI-PG-S-2855 00 KAIG3-RFI-PG-S-2855-00
KAIG3-RFI-PG-S-2854 00 KAIG3-RFI-PG-S-2854-00
KAIG3-RFI-WG-S-2853 00 KAIG3-RFI-WG-S-2853-00
KAIG3-RFI-PG-SU-1341 00 KAIG3-RFI-PG-SU-1341-00
KAIG3-RFI-PG-C-0095 00 KAIG3-RFI-PG-C-0095-00
KAIG3-RFI-ZG-C-0094 00 KAIG3-RFI-ZG-C-0094-00
KAIG3-RFI-CO-S-2845 00 KAIG3-RFI-CO-S-2845-00
KAIG3-RFI-CO-S-2844 00 KAIG3-RFI-CO-S-2844-00
KAIG3-RFI-CO-SU-1340 00 KAIG3-RFI-CO-SU-1340-00
KAIG3-RFI-CO-S-2843 00 KAIG3-RFI-CO-S-2843-00
KAIG3-RFI-CO-S-2842 00 KAIG3-RFI-CO-S-2842-00
KAIG3-RFI-CO-S-2841 00 KAIG3-RFI-CO-S-2841-00
KAIG3-RFI-CO-S-2840 00 KAIG3-RFI-CO-S-2840-00
KAIG3-RFI-CO-S-2839 00 KAIG3-RFI-CO-S-2839-00
KAIG3-RFI-CO-S-2838 00 KAIG3-RFI-CO-S-2838-00
KAIG3-RFI-CO-S-2837 00 KAIG3-RFI-CO-S-2837-00
KAIG3-RFI-CO-S-2836 00 KAIG3-RFI-CO-S-2836-00
KAIG3-RFI-CO-S-2835 00 KAIG3-RFI-CO-S-2835-00
KAIG3-RFI-SW-SU-1281 01 KAIG3-RFI-SW-SU-1281-01
KAIG3-RFI-ZG-A-0430 00 KAIG3-RFI-ZG-A-0430-00
KAIG3-RFI-ZG-A-0429 00 KAIG3-RFI-ZG-A-0429-00
KAIG3-RFI-PA-S-2833 00 KAIG3-RFI-PA-S-2833-00
KAIG3-RFI-ZG-A-0428 00 KAIG3-RFI-ZG-A-0428-00
KAIG3-RFI-SW-A-0427 00 KAIG3-RFI-SW-A-0427-00
KAIG3-RFI-WG-SU-1339 00 KAIG3-RFI-WG-SU-1339-00
KAIG3-RFI-WG-SU-1338 00 KAIG3-RFI-WG-SU-1338-00
KAIG3-RFI-PA-S-2832 00 KAIG3-RFI-PA-S-2832-00
KAIG3-RFI-SW-S-2831 00 KAIG3-RFI-SW-S-2831-00
KAIG3-RFI-PA-S-2830 00 KAIG3-RFI-PA-S-2830-00
KAIG3-RFI-SW-S-2829 00 KAIG3-RFI-SW-S-2829-00
KAIG3-RFI-PA-S-2828 00 KAIG3-RFI-PA-S-2828-00
KAIG3-RFI-PA-S-2827 00 KAIG3-RFI-PA-S-2827-00
KAIG3-RFI-PA-S-2826 00 KAIG3-RFI-PA-S-2826-00
KAIG3-RFI-CO-SU-1335 00 KAIG3-RFI-CO-SU-1335-00
KAIG3-RFI-CO-SU-1336 00 KAIG3-RFI-CO-SU-1336-00
KAIG3-RFI-PG-S-2825 00 KAIG3-RFI-PG-S-2825-00
KAIG3-RFI-CO-SU-1337 00 KAIG3-RFI-CO-SU-1337-00
KAIG3-RFI-CO-S-2822 00 KAIG3-RFI-CO-S-2822-00
KAIG3-RFI-CO-S-2823 00 KAIG3-RFI-CO-S-2823-00
KAIG3-RFI-WG-S-2809 00 KAIG3-RFI-WG-S-2809-00
KAIG3-RFI-WG-S-2808 00 KAIG3-RFI-WG-S-2808-00
KAIG3-RFI-CO-S-2824 00 KAIG3-RFI-CO-S-2824-00
KAIG3-RFI-WG-S-2807 00 KAIG3-RFI-WG-S-2807-00
KAIG3-RFI-WG-S-2806 00 KAIG3-RFI-WG-S-2806-00
KAIG3-RFI-WG-S-2805 00 KAIG3-RFI-WG-S-2805-00
KAIG3-RFI-WG-S-2804 00 KAIG3-RFI-WG-S-2804-00
KAIG3-RFI-WG-LS-0331 00 KAIG3-RFI-WG-LS-0331-00
KAIG3-RFI-TG-LS-0338 00 KAIG3-RFI-TG-LS-0338-00
KAIG3-RFI-DG-LS-0337 00 KAIG3-RFI-DG-LS-0337-00
KAIG3-RFI-ZG-S-2810 00 KAIG3-RFI-ZG-S-2810-00
KAIG3-RFI-PA-S-2821 00 KAIG3-RFI-PA-S-2821-00
KAIG3-RFI-PA-S-2820 00 KAIG3-RFI-PA-S-2820-00
KAIG3-RFI-PA-S-2819 00 KAIG3-RFI-PA-S-2819-00
KAIG3-RFI-PG-S-2811 00 KAIG3-RFI-PG-S-2811-00
KAIG3-RFI-PA-S-2818 00 KAIG3-RFI-PA-S-2818-00
KAIG3-RFI-PA-S-2817 00 KAIG3-RFI-PA-S-2817-00
KAIG3-RFI-PA-S-2815 00 KAIG3-RFI-PA-S-2815-00
KAIG3-RFI-PA-S-2814 00 KAIG3-RFI-PA-S-2814-00
KAIG3-RFI-PA-S-2813 00 KAIG3-RFI-PA-S-2813-00
KAIG3-RFI-PA-S-2812 00 KAIG3-RFI-PA-S-2812-00
KAIG3-RFI-SW-S-2816 00 KAIG3-RFI-SW-S-2816-00
KAIG3-RFI-PA-S-2803 00 KAIG3-RFI-PA-S-2803-00
KAIG3-RFI-PA-S-2802 00 KAIG3-RFI-PA-S-2802-00
KAIG3-RFI-PA-S-2801 00 KAIG3-RFI-PA-S-2801-00
KAIG3-RFI-PA-S-2800 00 KAIG3-RFI-PA-S-2800-00
KAIG3-RFI-PA-S-2799 00 KAIG3-RFI-PA-S-2799-00
KAIG3-RFI-PA-S-2798 00 KAIG3-RFI-PA-S-2798-00
KAIG3-RFI-PA-S-2797 00 KAIG3-RFI-PA-S-2797-00
KAIG3-RFI-PA-S-2762 00 KAIG3-RFI-PA-S-2762-00
KAIG3-RFI-CO-SU-1124 01 KAIG3-RFI-CO-SU-1124-01
KAIG3-RFI-CO-S-2771 00 KAIG3-RFI-CO-S-2771-00
KAIG3-RFI-CO-S-2772 00 KAIG3-RFI-CO-S-2772-00
KAIG3-RFI-CO-S-2773 00 KAIG3-RFI-CO-S-2773-00
KAIG3-RFI-CO-S-2774 00 KAIG3-RFI-CO-S-2774-00
KAIG3-RFI-CO-S-2775 00 KAIG3-RFI-CO-S-2775-00
KAIG3-RFI-CO-S-2782 00 KAIG3-RFI-CO-S-2782-00
KAIG3-RFI-CO-S-2783 00 KAIG3-RFI-CO-S-2783-00
KAIG3-RFI-CO-S-2784 00 KAIG3-RFI-CO-S-2784-00
KAIG3-RFI-CO-S-2785 00 KAIG3-RFI-CO-S-2785-00
KAIG3-RFI-CO-S-2786 00 KAIG3-RFI-CO-S-2786-00
KAIG3-RFI-CO-S-2787 00 KAIG3-RFI-CO-S-2787-00
KAIG3-RFI-CO-S-2788 00 KAIG3-RFI-CO-S-2788-00
KAIG3-RFI-CO-S-2789 00 KAIG3-RFI-CO-S-2789-00
KAIG3-RFI-CO-S-2790 00 KAIG3-RFI-CO-S-2790-00
KAIG3-RFI-CO-S-2791 00 KAIG3-RFI-CO-S-2791-00
KAIG3-RFI-CO-S-2792 00 KAIG3-RFI-CO-S-2792-00
KAIG3-RFI-CO-S-2793 00 KAIG3-RFI-CO-S-2793-00
KAIG3-RFI-CO-S-2794 00 KAIG3-RFI-CO-S-2794-00
KAIG3-RFI-CO-S-2795 00 KAIG3-RFI-CO-S-2795-00
KAIG3-RFI-CO-SU-1332 00 KAIG3-RFI-CO-SU-1332-00
KAIG3-RFI-CO-SU-1333 00 KAIG3-RFI-CO-SU-1333-00
KAIG3-RFI-CO-SU-1334 00 KAIG3-RFI-CO-SU-1334-00
KAIG3-RFI-AG-C-0093 00 KAIG3-RFI-AG-C-0093-00
KAIG3-RFI-SW-LS-0336 00 KAIG3-RFI-SW-LS-0336-00
KAIG3-RFI-SW-LS-0335 00 KAIG3-RFI-SW-LS-0335-00
KAIG3-RFI-PA-S-2781 00 KAIG3-RFI-PA-S-2781-00
KAIG3-RFI-PA-S-2780 00 KAIG3-RFI-PA-S-2780-00
KAIG3-RFI-PA-S-2779 00 KAIG3-RFI-PA-S-2779-00
KAIG3-RFI-PA-S-2778 00 KAIG3-RFI-PA-S-2778-00
KAIG3-RFI-SW-A-0426 00 KAIG3-RFI-SW-A-0426-00
KAIG3-RFI-SW-S-2796 00 KAIG3-RFI-SW-S-2796-00
KAIG3-RFI-SW-S-2777 00 KAIG3-RFI-SW-S-2777-00
KAIG3-RFI-SW-S-2776 00 KAIG3-RFI-SW-S-2776-00
KAIG3-RFI-CO-LC-0150 00 KAIG3-RFI-CO-LC-0150-00
KAIG3-RFI-CO-E-0170 00 KAIG3-RFI-CO-E-0170-00
KAIG3-RFI-CO-E-0169 00 KAIG3-RFI-CO-E-0169-00
KAIG3-RFI-ZG-SU-1330 00 KAIG3-RFI-ZG-SU-1330-00
KAIG3-RFI-ZG-S-2766 00 KAIG3-RFI-ZG-S-2766-00
KAIG3-RFI-ZG-S-2765 00 KAIG3-RFI-ZG-S-2765-00
KAIG3-RFI-ZG-S-2764 00 KAIG3-RFI-ZG-S-2764-00
KAIG3-RFI-ZG-A-0425 00 KAIG3-RFI-ZG-A-0425-00
KAIG3-RFI-WG-SU-1326 00 KAIG3-RFI-WG-SU-1326-00
KAIG3-RFI-WG-S-2757 00 KAIG3-RFI-WG-S-2757-00
KAIG3-RFI-WG-S-2756 00 KAIG3-RFI-WG-S-2756-00
KAIG3-RFI-WG-SU-1325 00 KAIG3-RFI-WG-SU-1325-00
KAIG3-RFI-WG-S-2755 00 KAIG3-RFI-WG-S-2755-00
KAIG3-RFI-WG-S-2754 00 KAIG3-RFI-WG-S-2754-00
KAIG3-RFI-ZG-S-2763 00 KAIG3-RFI-ZG-S-2763-00
KAIG3-RFI-SW-A-0424 00 KAIG3-RFI-SW-A-0424-00
KAIG3-RFI-SW-LS-0334 00 KAIG3-RFI-SW-LS-0334-00
KAIG3-RFI-SW-LS-0333 00 KAIG3-RFI-SW-LS-0333-00
KAIG3-RFI-PA-S-2770 00 KAIG3-RFI-PA-S-2770-00
KAIG3-RFI-PA-S-2769 00 KAIG3-RFI-PA-S-2769-00
KAIG3-RFI-PA-S-2768 00 KAIG3-RFI-PA-S-2768-00
KAIG3-RFI-PA-S-2767 00 KAIG3-RFI-PA-S-2767-00
KAIG3-RFI-PA-S-2761 00 KAIG3-RFI-PA-S-2761-00
KAIG3-RFI-SW-S-2759 00 KAIG3-RFI-SW-S-2759-00
KAIG3-RFI-PA-S-2758 00 KAIG3-RFI-PA-S-2758-00
KAIG3-RFI-PA-S-2560 00 KAIG3-RFI-PA-S-2560-00
KAIG3-RFI-ZG-C-0092 00 KAIG3-RFI-ZG-C-0092-00
KAIG3-RFI-PG-SU-1049 00 KAIG3-RFI-PG-SU-1049-00
KAIG3-RFI-WG-SU-1324 00 KAIG3-RFI-WG-SU-1324-00
KAIG3-RFI-AG-S-2753 00 KAIG3-RFI-AG-S-2753-00
KAIG3-RFI-AG-S-2752 00 KAIG3-RFI-AG-S-2752-00
KAIG3-RFI-AG-S-2751 00 KAIG3-RFI-AG-S-2751-00
KAIG3-RFI-AG-S-2750 00 KAIG3-RFI-AG-S-2750-00
KAIG3-RFI-AG-S-2748 00 KAIG3-RFI-AG-S-2748-00
KAIG3-RFI-WG-S-2742 00 KAIG3-RFI-WG-S-2742-00
KAIG3-RFI-WG-S-2741 00 KAIG3-RFI-WG-S-2741-00
KAIG3-RFI-WG-S-2740 00 KAIG3-RFI-WG-S-2740-00
KAIG3-RFI-WG-S-2739 00 KAIG3-RFI-WG-S-2739-00
KAIG3-RFI-WG-S-2738 00 KAIG3-RFI-WG-S-2738-00
KAIG3-RFI-WG-S-2737 00 KAIG3-RFI-WG-S-2737-00
KAIG3-RFI-AG-SU-1323 00 KAIG3-RFI-AG-SU-1323-00
KAIG3-RFI-SW-S-2746 00 KAIG3-RFI-SW-S-2746-00
KAIG3-RFI-PA-S-2745 00 KAIG3-RFI-PA-S-2745-00
KAIG3-RFI-PA-S-2744 00 KAIG3-RFI-PA-S-2744-00
KAIG3-RFI-PA-S-2743 00 KAIG3-RFI-PA-S-2743-00
KAIG3-RFI-SW-SU-1277 01 KAIG3-RFI-SW-SU-1277-01
KAIG3-RFI-PA-S-2736 00 KAIG3-RFI-PA-S-2736-00
KAIG3-RFI-CO-LC-0152 00 KAIG3-RFI-CO-LC-0152-00
KAIG3-RFI-CO-LC-0151 00 KAIG3-RFI-CO-LC-0151-00
KAIG3-RFI-CO-SU-1329 00 KAIG3-RFI-CO-SU-1329-00
KAIG3-RFI-CO-SU-1328 00 KAIG3-RFI-CO-SU-1328-00
KAIG3-RFI-CO-SU-1327 00 KAIG3-RFI-CO-SU-1327-00
KAIG3-RFI-SW-S-2544 00 KAIG3-RFI-SW-S-2544-00
KAIG3-RFI-CO-S-2719 00 KAIG3-RFI-CO-S-2719-00
KAIG3-RFI-CO-S-2720 00 KAIG3-RFI-CO-S-2720-00
KAIG3-RFI-SW-S-2729 00 KAIG3-RFI-SW-S-2729-00
KAIG3-RFI-PA-S-2733 00 KAIG3-RFI-PA-S-2733-00
KAIG3-RFI-CO-S-2721 00 KAIG3-RFI-CO-S-2721-00
KAIG3-RFI-PA-S-2732 00 KAIG3-RFI-PA-S-2732-00
KAIG3-RFI-PA-S-2718 00 KAIG3-RFI-PA-S-2718-00
KAIG3-RFI-PA-S-2735 00 KAIG3-RFI-PA-S-2735-00
KAIG3-RFI-CO-S-2722 00 KAIG3-RFI-CO-S-2722-00
KAIG3-RFI-PA-S-2734 00 KAIG3-RFI-PA-S-2734-00
KAIG3-RFI-PA-S-2731 00 KAIG3-RFI-PA-S-2731-00
KAIG3-RFI-PA-S-2730 00 KAIG3-RFI-PA-S-2730-00
KAIG3-RFI-CO-S-2723 00 KAIG3-RFI-CO-S-2723-00
KAIG3-RFI-CO-S-2724 00 KAIG3-RFI-CO-S-2724-00
KAIG3-RFI-CO-S-2725 00 KAIG3-RFI-CO-S-2725-00
KAIG3-RFI-CO-S-2726 00 KAIG3-RFI-CO-S-2726-00
KAIG3-RFI-CO-S-2728 00 KAIG3-RFI-CO-S-2728-00
KAIG3-RFI-CO-S-2727 00 KAIG3-RFI-CO-S-2727-00
KAIG3-RFI-TG-C-0091 00 KAIG3-RFI-TG-C-0091-00
KAIG3-RFI-SW-A-0423 00 KAIG3-RFI-SW-A-0423-00
KAIG3-RFI-ZG-A-0422 00 KAIG3-RFI-ZG-A-0422-00
KAIG3-RFI-ZG-A-0421 00 KAIG3-RFI-ZG-A-0421-00
KAIG3-RFI-ZG-A-0420 00 KAIG3-RFI-ZG-A-0420-00
KAIG3-RFI-ZG-SU-1322 00 KAIG3-RFI-ZG-SU-1322-00
KAIG3-RFI-ZG-S-2717 00 KAIG3-RFI-ZG-S-2717-00
KAIG3-RFI-TG-S-2716 00 KAIG3-RFI-TG-S-2716-00
KAIG3-RFI-SW-LS-0332 00 KAIG3-RFI-SW-LS-0332-00
KAIG3-RFI-SW-LS-0330 00 KAIG3-RFI-SW-LS-0330-00
KAIG3-RFI-SW-LS-0329 00 KAIG3-RFI-SW-LS-0329-00
KAIG3-RFI-SW-LS-0328 00 KAIG3-RFI-SW-LS-0328-00
KAIG3-RFI-SW-S-2714 00 KAIG3-RFI-SW-S-2714-00
KAIG3-RFI-PA-S-2713 00 KAIG3-RFI-PA-S-2713-00
KAIG3-RFI-PA-S-2712 00 KAIG3-RFI-PA-S-2712-00
KAIG3-RFI-PA-S-2711 00 KAIG3-RFI-PA-S-2711-00
KAIG3-RFI-PA-S-2710 00 KAIG3-RFI-PA-S-2710-00
KAIG3-RFI-PA-S-2709 00 KAIG3-RFI-PA-S-2709-00
KAIG3-RFI-CO-SU-1299 01 KAIG3-RFI-CO-SU-1299-01
KAIG3-RFI-CO-SU-1298 00 KAIG3-RFI-CO-SU-1298-00
KAIG3-RFI-CO-SU-1321 00 KAIG3-RFI-CO-SU-1321-00
KAIG3-RFI-CO-S-2715 00 KAIG3-RFI-CO-S-2715-00
KAIG3-RFI-ZG-C-0090 00 KAIG3-RFI-ZG-C-0090-00
KAIG3-RFI-WG-SU-1319 00 KAIG3-RFI-WG-SU-1319-00
KAIG3-RFI-PG-SU-1318 00 KAIG3-RFI-PG-SU-1318-00
KAIG3-RFI-WG-S-2704 00 KAIG3-RFI-WG-S-2704-00
KAIG3-RFI-WG-SU-1317 00 KAIG3-RFI-WG-SU-1317-00
KAIG3-RFI-WG-SU-1316 00 KAIG3-RFI-WG-SU-1316-00
KAIG3-RFI-WG-S-2703 00 KAIG3-RFI-WG-S-2703-00
KAIG3-RFI-CO-S-2673 00 KAIG3-RFI-CO-S-2673-00
KAIG3-RFI-WG-S-2702 00 KAIG3-RFI-WG-S-2702-00
KAIG3-RFI-WG-SU-1312 00 KAIG3-RFI-WG-SU-1312-00
KAIG3-RFI-CO-S-2674 00 KAIG3-RFI-CO-S-2674-00
KAIG3-RFI-WG-S-2692 00 KAIG3-RFI-WG-S-2692-00
KAIG3-RFI-WG-S-2691 00 KAIG3-RFI-WG-S-2691-00
KAIG3-RFI-CO-S-2675 00 KAIG3-RFI-CO-S-2675-00
KAIG3-RFI-WG-S-2690 00 KAIG3-RFI-WG-S-2690-00
KAIG3-RFI-WG-SU-1311 00 KAIG3-RFI-WG-SU-1311-00
KAIG3-RFI-CO-S-2676 00 KAIG3-RFI-CO-S-2676-00
KAIG3-RFI-CO-S-2677 00 KAIG3-RFI-CO-S-2677-00
KAIG3-RFI-SW-S-2684 00 KAIG3-RFI-SW-S-2684-00
KAIG3-RFI-PA-S-2705 00 KAIG3-RFI-PA-S-2705-00
KAIG3-RFI-CO-SU-1320 00 KAIG3-RFI-CO-SU-1320-00
KAIG3-RFI-PA-S-2697 00 KAIG3-RFI-PA-S-2697-00
KAIG3-RFI-PA-S-2696 00 KAIG3-RFI-PA-S-2696-00
KAIG3-RFI-PA-S-2695 00 KAIG3-RFI-PA-S-2695-00
KAIG3-RFI-PA-S-2694 00 KAIG3-RFI-PA-S-2694-00
KAIG3-RFI-CO-S-2706 00 KAIG3-RFI-CO-S-2706-00
KAIG3-RFI-PA-S-2693 00 KAIG3-RFI-PA-S-2693-00
KAIG3-RFI-SW-S-2698 00 KAIG3-RFI-SW-S-2698-00
KAIG3-RFI-CO-S-2708 00 KAIG3-RFI-CO-S-2708-00
KAIG3-RFI-SW-P-0089 00 KAIG3-RFI-SW-P-0089-00
KAIG3-RFI-CO-SU-1313 00 KAIG3-RFI-CO-SU-1313-00
KAIG3-RFI-CO-SU-1314 00 KAIG3-RFI-CO-SU-1314-00
KAIG3-RFI-CO-SU-1315 00 KAIG3-RFI-CO-SU-1315-00
KAIG3-RFI-CO-S-2699 00 KAIG3-RFI-CO-S-2699-00
KAIG3-RFI-CO-S-2700 00 KAIG3-RFI-CO-S-2700-00
KAIG3-RFI-CO-S-2701 00 KAIG3-RFI-CO-S-2701-00
KAIG3-RFI-ZG-C-0088 00 KAIG3-RFI-ZG-C-0088-00
KAIG3-RFI-TG-C-0087 00 KAIG3-RFI-TG-C-0087-00
KAIG3-RFI-MB-M-0086 00 KAIG3-RFI-MB-M-0086-00
KAIG3-RFI-ZG-S-2689 00 KAIG3-RFI-ZG-S-2689-00
KAIG3-RFI-ZG-S-2688 00 KAIG3-RFI-ZG-S-2688-00
KAIG3-RFI-ZG-S-2687 00 KAIG3-RFI-ZG-S-2687-00
KAIG3-RFI-ZG-A-0419 00 KAIG3-RFI-ZG-A-0419-00
KAIG3-RFI-TG-SU-1310 00 KAIG3-RFI-TG-SU-1310-00
KAIG3-RFI-SW-S-2671 00 KAIG3-RFI-SW-S-2671-00
KAIG3-RFI-SW-S-2670 00 KAIG3-RFI-SW-S-2670-00
KAIG3-RFI-PA-S-2686 00 KAIG3-RFI-PA-S-2686-00
KAIG3-RFI-SW-LS-0282 02 KAIG3-RFI-SW-LS-0282-02
KAIG3-RFI-SW-S-2685 00 KAIG3-RFI-SW-S-2685-00
KAIG3-RFI-CO-S-2678 00 KAIG3-RFI-CO-S-2678-00
KAIG3-RFI-CO-S-2679 00 KAIG3-RFI-CO-S-2679-00
KAIG3-RFI-CO-S-2680 00 KAIG3-RFI-CO-S-2680-00
KAIG3-RFI-CO-S-2681 00 KAIG3-RFI-CO-S-2681-00
KAIG3-RFI-CO-S-2682 00 KAIG3-RFI-CO-S-2682-00
KAIG3-RFI-CO-SU-1309 00 KAIG3-RFI-CO-SU-1309-00
KAIG3-RFI-CO-S-2683 00 KAIG3-RFI-CO-S-2683-00
KAIG3-RFI-PA-S-2651 00 KAIG3-RFI-PA-S-2651-00
KAIG3-RFI-ZG-S-2669 00 KAIG3-RFI-ZG-S-2669-00
KAIG3-RFI-TG-S-2668 00 KAIG3-RFI-TG-S-2668-00
KAIG3-RFI-WG-S-2666 00 KAIG3-RFI-WG-S-2666-00
KAIG3-RFI-WG-S-2667 00 KAIG3-RFI-WG-S-2667-00
KAIG3-RFI-WG-S-2665 00 KAIG3-RFI-WG-S-2665-00
KAIG3-RFI-WG-S-2664 00 KAIG3-RFI-WG-S-2664-00
KAIG3-RFI-WG-S-2663 00 KAIG3-RFI-WG-S-2663-00
KAIG3-RFI-WG-S-2662 00 KAIG3-RFI-WG-S-2662-00
KAIG3-RFI-DG-LS-0327 00 KAIG3-RFI-DG-LS-0327-00
KAIG3-RFI-PG-S-2661 00 KAIG3-RFI-PG-S-2661-00
KAIG3-RFI-PG-S-2660 00 KAIG3-RFI-PG-S-2660-00
KAIG3-RFI-PG-S-2659 00 KAIG3-RFI-PG-S-2659-00
KAIG3-RFI-PG-S-2658 00 KAIG3-RFI-PG-S-2658-00
KAIG3-RFI-PG-S-2647 00 KAIG3-RFI-PG-S-2647-00
KAIG3-RFI-PG-S-2646 00 KAIG3-RFI-PG-S-2646-00
KAIG3-RFI-WG-S-2645 00 KAIG3-RFI-WG-S-2645-00
KAIG3-RFI-WG-SU-1307 00 KAIG3-RFI-WG-SU-1307-00
KAIG3-RFI-WG-S-2644 00 KAIG3-RFI-WG-S-2644-00
KAIG3-RFI-WG-SU-1306 00 KAIG3-RFI-WG-SU-1306-00
KAIG3-RFI-WG-S-2643 00 KAIG3-RFI-WG-S-2643-00
KAIG3-RFI-WG-SU-1305 00 KAIG3-RFI-WG-SU-1305-00
KAIG3-RFI-WG-S-2642 00 KAIG3-RFI-WG-S-2642-00
KAIG3-RFI-WG-SU-1304 00 KAIG3-RFI-WG-SU-1304-00
KAIG3-RFI-TG-A-0418 00 KAIG3-RFI-TG-A-0418-00
KAIG3-RFI-TG-A-0417 00 KAIG3-RFI-TG-A-0417-00
KAIG3-RFI-CO-S-2648 00 KAIG3-RFI-CO-S-2648-00
KAIG3-RFI-CO-S-2652 00 KAIG3-RFI-CO-S-2652-00
KAIG3-RFI-CO-S-2654 00 KAIG3-RFI-CO-S-2654-00
KAIG3-RFI-CO-S-2655 00 KAIG3-RFI-CO-S-2655-00
KAIG3-RFI-CO-S-2656 00 KAIG3-RFI-CO-S-2656-00
KAIG3-RFI-CO-S-2657 00 KAIG3-RFI-CO-S-2657-00
KAIG3-RFI-CO-S-2672 00 KAIG3-RFI-CO-S-2672-00
KAIG3-RFI-CO-SU-1308 00 KAIG3-RFI-CO-SU-1308-00
KAIG3-RFI-SW-S-2650 00 KAIG3-RFI-SW-S-2650-00
KAIG3-RFI-SW-S-2649 00 KAIG3-RFI-SW-S-2649-00
KAIG3-RFI-SW-LS-0326 00 KAIG3-RFI-SW-LS-0326-00
KAIG3-RFI-PA-S-2641 00 KAIG3-RFI-PA-S-2641-00
KAIG3-RFI-PA-LS-0325 00 KAIG3-RFI-PA-LS-0325-00
KAIG3-RFI-CO-S-2640 00 KAIG3-RFI-CO-S-2640-00
KAIG3-RFI-CO-SU-1303 00 KAIG3-RFI-CO-SU-1303-00
KAIG3-RFI-CO-S-2639 00 KAIG3-RFI-CO-S-2639-00
KAIG3-RFI-CO-S-2638 00 KAIG3-RFI-CO-S-2638-00
KAIG3-RFI-CO-S-2637 00 KAIG3-RFI-CO-S-2637-00
KAIG3-RFI-CO-S-2636 00 KAIG3-RFI-CO-S-2636-00
KAIG3-RFI-CO-S-2635 00 KAIG3-RFI-CO-S-2635-00
KAIG3-RFI-CO-S-2634 00 KAIG3-RFI-CO-S-2634-00
KAIG3-RFI-WG-S-2627 00 KAIG3-RFI-WG-S-2627-00
KAIG3-RFI-ZG-S-2626 00 KAIG3-RFI-ZG-S-2626-00
KAIG3-RFI-ZG-S-2625 00 KAIG3-RFI-ZG-S-2625-00
KAIG3-RFI-WG-S-2628 00 KAIG3-RFI-WG-S-2628-00
KAIG3-RFI-SW-A-0416 00 KAIG3-RFI-SW-A-0416-00
KAIG3-RFI-SW-P-0084 00 KAIG3-RFI-SW-P-0084-00
KAIG3-RFI-SW-S-2620 00 KAIG3-RFI-SW-S-2620-00
KAIG3-RFI-SW-S-2533 00 KAIG3-RFI-SW-S-2533-00
KAIG3-RFI-PA-S-2624 00 KAIG3-RFI-PA-S-2624-00
KAIG3-RFI-PA-S-2623 00 KAIG3-RFI-PA-S-2623-00
KAIG3-RFI-PA-S-2622 00 KAIG3-RFI-PA-S-2622-00
KAIG3-RFI-CO-SU-1302 00 KAIG3-RFI-CO-SU-1302-00
KAIG3-RFI-CO-S-2631 00 KAIG3-RFI-CO-S-2631-00
KAIG3-RFI-CO-S-2633 00 KAIG3-RFI-CO-S-2633-00
KAIG3-RFI-CO-S-2629 00 KAIG3-RFI-CO-S-2629-00
KAIG3-RFI-CO-S-2630 00 KAIG3-RFI-CO-S-2630-00
KAIG3-RFI-ZG-C-0085 00 KAIG3-RFI-ZG-C-0085-00
KAIG3-RFI-ZG-SU-1301 00 KAIG3-RFI-ZG-SU-1301-00
KAIG3-RFI-TG-SU-1300 00 KAIG3-RFI-TG-SU-1300-00
KAIG3-RFI-ZG-S-2621 00 KAIG3-RFI-ZG-S-2621-00
KAIG3-RFI-TG-A-0414 00 KAIG3-RFI-TG-A-0414-00
KAIG3-RFI-SW-A-0415 00 KAIG3-RFI-SW-A-0415-00
KAIG3-RFI-CO-S-2612 00 KAIG3-RFI-CO-S-2612-00
KAIG3-RFI-CO-S-2613 00 KAIG3-RFI-CO-S-2613-00
KAIG3-RFI-CO-S-2614 00 KAIG3-RFI-CO-S-2614-00
KAIG3-RFI-CO-S-2617 00 KAIG3-RFI-CO-S-2617-00
KAIG3-RFI-CO-S-2616 00 KAIG3-RFI-CO-S-2616-00
KAIG3-RFI-CO-S-2618 00 KAIG3-RFI-CO-S-2618-00
KAIG3-RFI-CO-SU-1289 00 KAIG3-RFI-CO-SU-1289-00
KAIG3-RFI-SW-SU-1296 00 KAIG3-RFI-SW-SU-1296-00
KAIG3-RFI-CO-SU-1297 00 KAIG3-RFI-CO-SU-1297-00
KAIG3-RFI-SW-SU-1295 00 KAIG3-RFI-SW-SU-1295-00
KAIG3-RFI-SW-S-2619 00 KAIG3-RFI-SW-S-2619-00
KAIG3-RFI-SW-S-2611 00 KAIG3-RFI-SW-S-2611-00
KAIG3-RFI-CO-SU-1299 00 KAIG3-RFI-CO-SU-1299-00
KAIG3-RFI-SW-LS-0324 00 KAIG3-RFI-SW-LS-0324-00
KAIG3-RFI-SW-LS-0323 00 KAIG3-RFI-SW-LS-0323-00
KAIG3-RFI-PA-S-2610 00 KAIG3-RFI-PA-S-2610-00
KAIG3-RFI-MB-P-0083 00 KAIG3-RFI-MB-P-0083-00
KAIG3-RFI-SW-SU-1294 00 KAIG3-RFI-SW-SU-1294-00
KAIG3-RFI-SW-SU-1293 00 KAIG3-RFI-SW-SU-1293-00
KAIG3-RFI-SW-SU-1292 00 KAIG3-RFI-SW-SU-1292-00
KAIG3-RFI-SW-LS-0322 00 KAIG3-RFI-SW-LS-0322-00
KAIG3-RFI-SW-LS-0321 00 KAIG3-RFI-SW-LS-0321-00
KAIG3-RFI-SW-LS-0320 00 KAIG3-RFI-SW-LS-0320-00
KAIG3-RFI-WG-SU-1291 00 KAIG3-RFI-WG-SU-1291-00
KAIG3-RFI-SW-LS-0319 00 KAIG3-RFI-SW-LS-0319-00
KAIG3-RFI-WG-S-2609 00 KAIG3-RFI-WG-S-2609-00
KAIG3-RFI-SW-LS-0318 00 KAIG3-RFI-SW-LS-0318-00
KAIG3-RFI-WG-S-2608 00 KAIG3-RFI-WG-S-2608-00
KAIG3-RFI-PA-S-2596 00 KAIG3-RFI-PA-S-2596-00
KAIG3-RFI-WG-S-2607 00 KAIG3-RFI-WG-S-2607-00
KAIG3-RFI-CO-SU-1288 00 KAIG3-RFI-CO-SU-1288-00
KAIG3-RFI-WG-SU-1290 00 KAIG3-RFI-WG-SU-1290-00
KAIG3-RFI-PA-S-2595 00 KAIG3-RFI-PA-S-2595-00
KAIG3-RFI-PA-S-2589 00 KAIG3-RFI-PA-S-2589-00
KAIG3-RFI-WG-S-2600 00 KAIG3-RFI-WG-S-2600-00
KAIG3-RFI-CO-S-2601 00 KAIG3-RFI-CO-S-2601-00
KAIG3-RFI-WG-SU-1287 00 KAIG3-RFI-WG-SU-1287-00
KAIG3-RFI-WG-S-2599 00 KAIG3-RFI-WG-S-2599-00
KAIG3-RFI-WG-SU-1286 00 KAIG3-RFI-WG-SU-1286-00
KAIG3-RFI-CO-S-2602 00 KAIG3-RFI-CO-S-2602-00
KAIG3-RFI-WG-S-2598 00 KAIG3-RFI-WG-S-2598-00
KAIG3-RFI-TG-A-0413 00 KAIG3-RFI-TG-A-0413-00
KAIG3-RFI-SW-S-2597 00 KAIG3-RFI-SW-S-2597-00
KAIG3-RFI-CO-S-2603 00 KAIG3-RFI-CO-S-2603-00
KAIG3-RFI-CO-S-2604 00 KAIG3-RFI-CO-S-2604-00
KAIG3-RFI-CO-S-2605 00 KAIG3-RFI-CO-S-2605-00
KAIG3-RFI-CO-S-2606 00 KAIG3-RFI-CO-S-2606-00
KAIG3-RFI-GN-LS-0042 00 KAIG3-RFI-GN-LS-0042-00
KAIG3-RFI-GN-LS-0059 00 KAIG3-RFI-GN-LS-0059-00
KAIG3-RFI-GN-S-1163 00 KAIG3-RFI-GN-S-1163-00
KAIG3-RFI-PA-S-2590 00 KAIG3-RFI-PA-S-2590-00
KAIG3-RFI-PA-S-2578 00 KAIG3-RFI-PA-S-2578-00
KAIG3-RFI-PA-S-2577 00 KAIG3-RFI-PA-S-2577-00
KAIG3-RFI-PA-S-2591 00 KAIG3-RFI-PA-S-2591-00
KAIG3-RFI-TG-S-2594 00 KAIG3-RFI-TG-S-2594-00
KAIG3-RFI-TG-S-2593 00 KAIG3-RFI-TG-S-2593-00
KAIG3-RFI-TG-S-2592 00 KAIG3-RFI-TG-S-2592-00
KAIG3-RFI-TG-S-2509 00 KAIG3-RFI-TG-S-2509-00
KAIG3-RFI-TG-A-0412 00 KAIG3-RFI-TG-A-0412-00
KAIG3-RFI-SW-S-2588 00 KAIG3-RFI-SW-S-2588-00
KAIG3-RFI-SW-S-2587 00 KAIG3-RFI-SW-S-2587-00
KAIG3-RFI-SW-S-2586 00 KAIG3-RFI-SW-S-2586-00
KAIG3-RFI-SW-S-2585 00 KAIG3-RFI-SW-S-2585-00
KAIG3-RFI-SW-S-2584 00 KAIG3-RFI-SW-S-2584-00
KAIG3-RFI-SW-S-2583 00 KAIG3-RFI-SW-S-2583-00
KAIG3-RFI-SW-S-2582 00 KAIG3-RFI-SW-S-2582-00
KAIG3-RFI-SW-S-2581 00 KAIG3-RFI-SW-S-2581-00
KAIG3-RFI-CO-S-2579 00 KAIG3-RFI-CO-S-2579-00
KAIG3-RFI-SW-S-2580 00 KAIG3-RFI-SW-S-2580-00
KAIG3-RFI-CO-SU-1272 01 KAIG3-RFI-CO-SU-1272-01
KAIG3-RFI-CO-SU-1283 00 KAIG3-RFI-CO-SU-1283-00
KAIG3-RFI-CO-S-2569 00 KAIG3-RFI-CO-S-2569-00
KAIG3-RFI-CO-S-1521 01 KAIG3-RFI-CO-S-1521-01
KAIG3-RFI-CO-S-1519 01 KAIG3-RFI-CO-S-1519-01
KAIG3-RFI-CO-SU-0879 02 KAIG3-RFI-CO-SU-0879-02
KAIG3-RFI-CO-S-0477 02 KAIG3-RFI-CO-S-0477-02
KAIG3-RFI-SW-LS-0316 00 KAIG3-RFI-SW-LS-0316-00
KAIG3-RFI-CO-SU-1285 00 KAIG3-RFI-CO-SU-1285-00
KAIG3-RFI-PA-S-2574 00 KAIG3-RFI-PA-S-2574-00
KAIG3-RFI-PA-S-2573 00 KAIG3-RFI-PA-S-2573-00
KAIG3-RFI-PA-S-2572 00 KAIG3-RFI-PA-S-2572-00
KAIG3-RFI-SW-LS-0317 00 KAIG3-RFI-SW-LS-0317-00
KAIG3-RFI-SW-LS-0282 01 KAIG3-RFI-SW-LS-0282-01
KAIG3-RFI-WG-SU-1284 00 KAIG3-RFI-WG-SU-1284-00
KAIG3-RFI-WG-SU-1282 00 KAIG3-RFI-WG-SU-1282-00
KAIG3-RFI-WG-S-2571 00 KAIG3-RFI-WG-S-2571-00
KAIG3-RFI-WG-S-2570 00 KAIG3-RFI-WG-S-2570-00
KAIG3-RFI-WG-S-2568-00 00 KAIG3-RFI-WG-S-2568-00-00
KAIG3-RFI-WG-S-2567 00 KAIG3-RFI-WG-S-2567-00
KAIG3-RFI-WG-S-2555 00 KAIG3-RFI-WG-S-2555-00
KAIG3-RFI-WG-S-2554 00 KAIG3-RFI-WG-S-2554-00
KAIG3-RFI-WG-S-2553 00 KAIG3-RFI-WG-S-2553-00
KAIG3-RFI-WG-S-2552 00 KAIG3-RFI-WG-S-2552-00
KAIG3-RFI-TG-A-0411 00 KAIG3-RFI-TG-A-0411-00
KAIG3-RFI-SW-A-0410 00 KAIG3-RFI-SW-A-0410-00
KAIG3-RFI-PG-S-2566 00 KAIG3-RFI-PG-S-2566-00
KAIG3-RFI-PG-S-2565 00 KAIG3-RFI-PG-S-2565-00
KAIG3-RFI-PG-S-2564 00 KAIG3-RFI-PG-S-2564-00
KAIG3-RFI-PG-S-2563 00 KAIG3-RFI-PG-S-2563-00
KAIG3-RFI-PG-S-2562 00 KAIG3-RFI-PG-S-2562-00
KAIG3-RFI-PG-S-2561 00 KAIG3-RFI-PG-S-2561-00
KAIG3-RFI-PG-S-2560 00 KAIG3-RFI-PG-S-2560-00
KAIG3-RFI-SW-S-2548 00 KAIG3-RFI-SW-S-2548-00
KAIG3-RFI-SW-LS-0315 00 KAIG3-RFI-SW-LS-0315-00
KAIG3-RFI-SW-LS-0284 02 KAIG3-RFI-SW-LS-0284-02
KAIG3-RFI-PA-S-2557 00 KAIG3-RFI-PA-S-2557-00
KAIG3-RFI-PA-S-2556 00 KAIG3-RFI-PA-S-2556-00
KAIG3-RFI-WG-S-2551 00 KAIG3-RFI-WG-S-2551-00
KAIG3-RFI-WG-S-2550 00 KAIG3-RFI-WG-S-2550-00
KAIG3-RFI-WG-S-2549 00 KAIG3-RFI-WG-S-2549-00
KAIG3-RFI-WG-S-2545 00 KAIG3-RFI-WG-S-2545-00
KAIG3-RFI-MB-S-2547 00 KAIG3-RFI-MB-S-2547-00
KAIG3-RFI-MB-S-2546 00 KAIG3-RFI-MB-S-2546-00
KAIG3-RFI-MB-A-0409 00 KAIG3-RFI-MB-A-0409-00
KAIG3-RFI-ZG-LS-0314 00 KAIG3-RFI-ZG-LS-0314-00
KAIG3-RFI-WG-S-2543 00 KAIG3-RFI-WG-S-2543-00
KAIG3-RFI-WG-S-2542 00 KAIG3-RFI-WG-S-2542-00
KAIG3-RFI-WG-S-2541 00 KAIG3-RFI-WG-S-2541-00
KAIG3-RFI-WG-S-2537 00 KAIG3-RFI-WG-S-2537-00
KAIG3-RFI-CO-S-2538 00 KAIG3-RFI-CO-S-2538-00
KAIG3-RFI-TG-LS-0313 00 KAIG3-RFI-TG-LS-0313-00
KAIG3-RFI-SW-A-0408 00 KAIG3-RFI-SW-A-0408-00
KAIG3-RFI-CO-S-2539 00 KAIG3-RFI-CO-S-2539-00
KAIG3-RFI-SW-A-0407 00 KAIG3-RFI-SW-A-0407-00
KAIG3-RFI-SW-S-2535 00 KAIG3-RFI-SW-S-2535-00
KAIG3-RFI-SW-S-2534 00 KAIG3-RFI-SW-S-2534-00
KAIG3-RFI-SW-LS-0312 00 KAIG3-RFI-SW-LS-0312-00
KAIG3-RFI-CO-SU-1280 00 KAIG3-RFI-CO-SU-1280-00
KAIG3-RFI-SW-LS-0311 00 KAIG3-RFI-SW-LS-0311-00
KAIG3-RFI-CO-SU-1278 00 KAIG3-RFI-CO-SU-1278-00
KAIG3-RFI-PA-S-2536 00 KAIG3-RFI-PA-S-2536-00
KAIG3-RFI-PA-S-2532 00 KAIG3-RFI-PA-S-2532-00
KAIG3-RFI-SW-SU-1281 00 KAIG3-RFI-SW-SU-1281-00
KAIG3-RFI-SW-S-2540 00 KAIG3-RFI-SW-S-2540-00
KAIG3-RFI-CO-GE-0287 00 KAIG3-RFI-CO-GE-0287-00
KAIG3-RFI-DG-C-0082 00 KAIG3-RFI-DG-C-0082-00
KAIG3-RFI-TG-C-0081 00 KAIG3-RFI-TG-C-0081-00
KAIG3-RFI-GN-SU-0853 01 KAIG3-RFI-GN-SU-0853-01
KAIG3-RFI-CO-SU-1279 00 KAIG3-RFI-CO-SU-1279-00
KAIG3-RFI-CO-S-2531 00 KAIG3-RFI-CO-S-2531-00
KAIG3-RFI-CO-S-2525 00 KAIG3-RFI-CO-S-2525-00
KAIG3-RFI-CO-S-2224 01 KAIG3-RFI-CO-S-2224-01
KAIG3-RFI-CO-S-2526 00 KAIG3-RFI-CO-S-2526-00
KAIG3-RFI-CO-S-2527 00 KAIG3-RFI-CO-S-2527-00
KAIG3-RFI-EC-GE-0279 00 KAIG3-RFI-EC-GE-0279-00
KAIG3-RFI-WG-LS-0310 00 KAIG3-RFI-WG-LS-0310-00
KAIG3-RFI-WG-LS-0309 00 KAIG3-RFI-WG-LS-0309-00
KAIG3-RFI-WG-LS-0227 01 KAIG3-RFI-WG-LS-0227-01
KAIG3-RFI-WG-LS-0218 01 KAIG3-RFI-WG-LS-0218-01
KAIG3-RFI-TG-S-2520 00 KAIG3-RFI-TG-S-2520-00
KAIG3-RFI-SW-S-2282 01 KAIG3-RFI-SW-S-2282-01
KAIG3-RFI-DG-S-2524 00 KAIG3-RFI-DG-S-2524-00
KAIG3-RFI-SW-S-2529 00 KAIG3-RFI-SW-S-2529-00
KAIG3-RFI-SW-S-2528 00 KAIG3-RFI-SW-S-2528-00
KAIG3-RFI-PA-S-2523 00 KAIG3-RFI-PA-S-2523-00
KAIG3-RFI-CO-GE-0288 00 KAIG3-RFI-CO-GE-0288-00
KAIG3-RFI-SW-S-2530 00 KAIG3-RFI-SW-S-2530-00
KAIG3-RFI-CO-S-2517 00 KAIG3-RFI-CO-S-2517-00
KAIG3-RFI-SW-SU-1277 00 KAIG3-RFI-SW-SU-1277-00
KAIG3-RFI-ZG-SU-1276 00 KAIG3-RFI-ZG-SU-1276-00
KAIG3-RFI-WG-SU-1275 00 KAIG3-RFI-WG-SU-1275-00
KAIG3-RFI-WG-SU-1266 00 KAIG3-RFI-WG-SU-1266-00
KAIG3-RFI-WG-S-2518 00 KAIG3-RFI-WG-S-2518-00
KAIG3-RFI-WG-S-2488 00 KAIG3-RFI-WG-S-2488-00
KAIG3-RFI-AG-S-2519 00 KAIG3-RFI-AG-S-2519-00
KAIG3-RFI-SW-LS-0308 00 KAIG3-RFI-SW-LS-0308-00
KAIG3-RFI-SW-S-2521 00 KAIG3-RFI-SW-S-2521-00
KAIG3-RFI-SW-LS-0206 03 KAIG3-RFI-SW-LS-0206-03
KAIG3-RFI-PA-S-2522 00 KAIG3-RFI-PA-S-2522-00
KAIG3-RFI-CO-SU-1260 00 KAIG3-RFI-CO-SU-1260-00
KAIG3-RFI-CO-S-2513 00 KAIG3-RFI-CO-S-2513-00
KAIG3-RFI-CO-S-2514 00 KAIG3-RFI-CO-S-2514-00
KAIG3-RFI-CO-S-2515 00 KAIG3-RFI-CO-S-2515-00
KAIG3-RFI-CO-SU-1272 00 KAIG3-RFI-CO-SU-1272-00
KAIG3-RFI-SW-SU-1273 00 KAIG3-RFI-SW-SU-1273-00
KAIG3-RFI-SW-SU-1274 00 KAIG3-RFI-SW-SU-1274-00
KAIG3-RFI-SW-S-2516 00 KAIG3-RFI-SW-S-2516-00
KAIG3-RFI-SW-C-2508 00 KAIG3-RFI-SW-C-2508-00
KAIG3-RFI-WG-SU-1271 00 KAIG3-RFI-WG-SU-1271-00
KAIG3-RFI-WG-S-2512 00 KAIG3-RFI-WG-S-2512-00
KAIG3-RFI-WG-S-2511 00 KAIG3-RFI-WG-S-2511-00
KAIG3-RFI-WG-S-2510 00 KAIG3-RFI-WG-S-2510-00
KAIG3-RFI-TG-SU-1270 00 KAIG3-RFI-TG-SU-1270-00
KAIG3-RFI-SW-A-0406 00 KAIG3-RFI-SW-A-0406-00
KAIG3-RFI-SW-A-0405 00 KAIG3-RFI-SW-A-0405-00
KAIG3-RFI-DG-SU-1269 00 KAIG3-RFI-DG-SU-1269-00
KAIG3-RFI-AG-S-2475 00 KAIG3-RFI-AG-S-2475-00
KAIG3-RFI-WG-SU-1257 00 KAIG3-RFI-WG-SU-1257-00
KAIG3-RFI-WG-E-0167 00 KAIG3-RFI-WG-E-0167-00
KAIG3-RFI-TG-C-0080 00 KAIG3-RFI-TG-C-0080-00
KAIG3-RFI-CO-S-2505 00 KAIG3-RFI-CO-S-2505-00
KAIG3-RFI-CO-S-2506 00 KAIG3-RFI-CO-S-2506-00
KAIG3-RFI-CO-S-2507 00 KAIG3-RFI-CO-S-2507-00
KAIG3-RFI-CO-S-2223 01 KAIG3-RFI-CO-S-2223-01
KAIG3-RFI-CO-SU-1254 00 KAIG3-RFI-CO-SU-1254-00
KAIG3-RFI-WG-SU-1268 00 KAIG3-RFI-WG-SU-1268-00
KAIG3-RFI-WG-SU-1267 00 KAIG3-RFI-WG-SU-1267-00
KAIG3-RFI-WG-S-2485 00 KAIG3-RFI-WG-S-2485-00
KAIG3-RFI-WG-LS-0307 00 KAIG3-RFI-WG-LS-0307-00
KAIG3-RFI-TG-S-2487 00 KAIG3-RFI-TG-S-2487-00
KAIG3-RFI-SW-S-2484 00 KAIG3-RFI-SW-S-2484-00
KAIG3-RFI-PG-S-2486 00 KAIG3-RFI-PG-S-2486-00
KAIG3-RFI-PA-S-2504 00 KAIG3-RFI-PA-S-2504-00
KAIG3-RFI-PA-S-2503 00 KAIG3-RFI-PA-S-2503-00
KAIG3-RFI-AG-E-0166 00 KAIG3-RFI-AG-E-0166-00
KAIG3-RFI-SW-S-1668 02 KAIG3-RFI-SW-S-1668-02
KAIG3-RFI-SW-S-1667 02 KAIG3-RFI-SW-S-1667-02
KAIG3-RFI-WG-SU-1265 00 KAIG3-RFI-WG-SU-1265-00
KAIG3-RFI-WG-S-2482 00 KAIG3-RFI-WG-S-2482-00
KAIG3-RFI-TG-S-2483 00 KAIG3-RFI-TG-S-2483-00
KAIG3-RFI-SW-S-2481 00 KAIG3-RFI-SW-S-2481-00
KAIG3-RFI-SW-A-0404 00 KAIG3-RFI-SW-A-0404-00
KAIG3-RFI-SW-A-0297 03 KAIG3-RFI-SW-A-0297-03
KAIG3-RFI-SW-LS-0305 00 KAIG3-RFI-SW-LS-0305-00
KAIG3-RFI-PA-S-2502 00 KAIG3-RFI-PA-S-2502-00
KAIG3-RFI-PA-A-0403 00 KAIG3-RFI-PA-A-0403-00
KAIG3-RFI-PA-A-0402 00 KAIG3-RFI-PA-A-0402-00
KAIG3-RFI-WG-S-2501 00 KAIG3-RFI-WG-S-2501-00
KAIG3-RFI-WG-S-2473 00 KAIG3-RFI-WG-S-2473-00
KAIG3-RFI-SW-S-2500 00 KAIG3-RFI-SW-S-2500-00
KAIG3-RFI-SW-S-2499 00 KAIG3-RFI-SW-S-2499-00
KAIG3-RFI-PG-S-2498 00 KAIG3-RFI-PG-S-2498-00
KAIG3-RFI-SW-S-2496 00 KAIG3-RFI-SW-S-2496-00
KAIG3-RFI-SW-S-2495 00 KAIG3-RFI-SW-S-2495-00
KAIG3-RFI-SW-S-2493 00 KAIG3-RFI-SW-S-2493-00
KAIG3-RFI-PA-S-2494 00 KAIG3-RFI-PA-S-2494-00
KAIG3-RFI-PA-A-0401 00 KAIG3-RFI-PA-A-0401-00
KAIG3-RFI-PA-S-2497 00 KAIG3-RFI-PA-S-2497-00
KAIG3-RFI-CO-S-2472 00 KAIG3-RFI-CO-S-2472-00
KAIG3-RFI-CO-S-2471 00 KAIG3-RFI-CO-S-2471-00
KAIG3-RFI-CO-S-2470 00 KAIG3-RFI-CO-S-2470-00
KAIG3-RFI-CO-S-2469 00 KAIG3-RFI-CO-S-2469-00
KAIG3-RFI-CO-S-2480 00 KAIG3-RFI-CO-S-2480-00
KAIG3-RFI-CO-SU-1259 00 KAIG3-RFI-CO-SU-1259-00
KAIG3-RFI-ZG-LS-0306 00 KAIG3-RFI-ZG-LS-0306-00
KAIG3-RFI-WG-SU-1263 00 KAIG3-RFI-WG-SU-1263-00
KAIG3-RFI-WG-SU-1262 00 KAIG3-RFI-WG-SU-1262-00
KAIG3-RFI-WG-S-2492 00 KAIG3-RFI-WG-S-2492-00
KAIG3-RFI-WG-S-2491 00 KAIG3-RFI-WG-S-2491-00
KAIG3-RFI-WG-S-2490 00 KAIG3-RFI-WG-S-2490-00
KAIG3-RFI-WG-S-2489 00 KAIG3-RFI-WG-S-2489-00
KAIG3-RFI-WG-S-2476 00 KAIG3-RFI-WG-S-2476-00
KAIG3-RFI-SW-S-2479 00 KAIG3-RFI-SW-S-2479-00
KAIG3-RFI-SW-S-2478 00 KAIG3-RFI-SW-S-2478-00
KAIG3-RFI-SW-S-2477 00 KAIG3-RFI-SW-S-2477-00
KAIG3-RFI-SW-A-0396 01 KAIG3-RFI-SW-A-0396-01
KAIG3-RFI-AG-SU-1264 00 KAIG3-RFI-AG-SU-1264-00
KAIG3-RFI-AG-S-2474 00 KAIG3-RFI-AG-S-2474-00
KAIG3-RFI-SW-LS-0284 01 KAIG3-RFI-SW-LS-0284-01
KAIG3-RFI-AG-E-0165 00 KAIG3-RFI-AG-E-0165-00
KAIG3-RFI-CO-S-2458 00 KAIG3-RFI-CO-S-2458-00
KAIG3-RFI-CO-S-2459 00 KAIG3-RFI-CO-S-2459-00
KAIG3-RFI-CO-S-2460 00 KAIG3-RFI-CO-S-2460-00
KAIG3-RFI-CO-S-2461 00 KAIG3-RFI-CO-S-2461-00
KAIG3-RFI-CO-S-2462 00 KAIG3-RFI-CO-S-2462-00
KAIG3-RFI-CO-S-2463 00 KAIG3-RFI-CO-S-2463-00
KAIG3-RFI-WG-S-2457 00 KAIG3-RFI-WG-S-2457-00
KAIG3-RFI-WG-S-2448 00 KAIG3-RFI-WG-S-2448-00
KAIG3-RFI-TG-SU-1258 00 KAIG3-RFI-TG-SU-1258-00
KAIG3-RFI-CO-SU-1218 01 KAIG3-RFI-CO-SU-1218-01
KAIG3-RFI-TG-S-2456 00 KAIG3-RFI-TG-S-2456-00
KAIG3-RFI-CO-SU-1219 01 KAIG3-RFI-CO-SU-1219-01
KAIG3-RFI-SW-S-2466 00 KAIG3-RFI-SW-S-2466-00
KAIG3-RFI-MB-S-2468 00 KAIG3-RFI-MB-S-2468-00
KAIG3-RFI-CO-SU-1227 01 KAIG3-RFI-CO-SU-1227-01
KAIG3-RFI-MB-S-2467 00 KAIG3-RFI-MB-S-2467-00
KAIG3-RFI-MB-S-2447 00 KAIG3-RFI-MB-S-2447-00
KAIG3-RFI-AG-SU-1261 00 KAIG3-RFI-AG-SU-1261-00
KAIG3-RFI-AG-S-2455 00 KAIG3-RFI-AG-S-2455-00
KAIG3-RFI-AG-S-2454 00 KAIG3-RFI-AG-S-2454-00
KAIG3-RFI-AG-S-2453 00 KAIG3-RFI-AG-S-2453-00
KAIG3-RFI-AG-S-2452 00 KAIG3-RFI-AG-S-2452-00
KAIG3-RFI-AG-S-2451 00 KAIG3-RFI-AG-S-2451-00
KAIG3-RFI-AG-S-2450 00 KAIG3-RFI-AG-S-2450-00
KAIG3-RFI-AG-S-2449 00 KAIG3-RFI-AG-S-2449-00
KAIG3-RFI-SW-S-2445 00 KAIG3-RFI-SW-S-2445-00
KAIG3-RFI-PA-S-2465 00 KAIG3-RFI-PA-S-2465-00
KAIG3-RFI-PA-S-2464 00 KAIG3-RFI-PA-S-2464-00
KAIG3-RFI-PA-S-2446 00 KAIG3-RFI-PA-S-2446-00
KAIG3-RFI-MB-S-1272 00 KAIG3-RFI-MB-S-1272-00
KAIG3-RFI-MB-M-0079 00 KAIG3-RFI-MB-M-0079-00
KAIG3-RFI-SW-S-2444 00 KAIG3-RFI-SW-S-2444-00
KAIG3-RFI-SW-S-1668 01 KAIG3-RFI-SW-S-1668-01
KAIG3-RFI-SW-S-1667 01 KAIG3-RFI-SW-S-1667-01
KAIG3-RFI-MB-A-0400-00 00 KAIG3-RFI-MB-A-0400-00-00
KAIG3-RFI-WG-SU-1256 00 KAIG3-RFI-WG-SU-1256-00
KAIG3-RFI-WG-S-2443 00 KAIG3-RFI-WG-S-2443-00
KAIG3-RFI-WG-LS-0304 00 KAIG3-RFI-WG-LS-0304-00
KAIG3-RFI-SW-A-0399 00 KAIG3-RFI-SW-A-0399-00
KAIG3-RFI-SW-S-2441 00 KAIG3-RFI-SW-S-2441-00
KAIG3-RFI-PA-S-2442 00 KAIG3-RFI-PA-S-2442-00
KAIG3-RFI-PA-S-2438 00 KAIG3-RFI-PA-S-2438-00
KAIG3-RFI-SW-SU-1255 00 KAIG3-RFI-SW-SU-1255-00
KAIG3-RFI-DG-C-0078 00 KAIG3-RFI-DG-C-0078-00
KAIG3-RFI-WG-SU-1252 00 KAIG3-RFI-WG-SU-1252-00
KAIG3-RFI-WG-S-2429 00 KAIG3-RFI-WG-S-2429-00
KAIG3-RFI-WG-S-2428 00 KAIG3-RFI-WG-S-2428-00
KAIG3-RFI-WG-A-0398 00 KAIG3-RFI-WG-A-0398-00
KAIG3-RFI-SW-S-2436 00 KAIG3-RFI-SW-S-2436-00
KAIG3-RFI-SW-S-2435 00 KAIG3-RFI-SW-S-2435-00
KAIG3-RFI-SW-S-2434 00 KAIG3-RFI-SW-S-2434-00
KAIG3-RFI-MB-S-2433 00 KAIG3-RFI-MB-S-2433-00
KAIG3-RFI-MB-S-2432 00 KAIG3-RFI-MB-S-2432-00
KAIG3-RFI-CO-S-2439 00 KAIG3-RFI-CO-S-2439-00
KAIG3-RFI-SW-LS-0303 00 KAIG3-RFI-SW-LS-0303-00
KAIG3-RFI-PA-S-2437 00 KAIG3-RFI-PA-S-2437-00
KAIG3-RFI-PA-S-2431 00 KAIG3-RFI-PA-S-2431-00
KAIG3-RFI-PA-S-2430 00 KAIG3-RFI-PA-S-2430-00
KAIG3-RFI-CO-S-2440 00 KAIG3-RFI-CO-S-2440-00
KAIG3-RFI-SW-SU-1253 00 KAIG3-RFI-SW-SU-1253-00
KAIG3-RFI-CO-S-2420 00 KAIG3-RFI-CO-S-2420-00
KAIG3-RFI-CO-S-2421 00 KAIG3-RFI-CO-S-2421-00
KAIG3-RFI-CO-S-2422 00 KAIG3-RFI-CO-S-2422-00
KAIG3-RFI-CO-S-2423 00 KAIG3-RFI-CO-S-2423-00
KAIG3-RFI-WG-SU-1251 00 KAIG3-RFI-WG-SU-1251-00
KAIG3-RFI-WG-S-2410 00 KAIG3-RFI-WG-S-2410-00
KAIG3-RFI-WG-S-2409 00 KAIG3-RFI-WG-S-2409-00
KAIG3-RFI-WG-S-2408 00 KAIG3-RFI-WG-S-2408-00
KAIG3-RFI-WG-S-2407 00 KAIG3-RFI-WG-S-2407-00
KAIG3-RFI-WG-S-2406 00 KAIG3-RFI-WG-S-2406-00
KAIG3-RFI-WG-S-2405 00 KAIG3-RFI-WG-S-2405-00
KAIG3-RFI-WG-S-2404 00 KAIG3-RFI-WG-S-2404-00
KAIG3-RFI-PG-SU-1250 00 KAIG3-RFI-PG-SU-1250-00
KAIG3-RFI-PG-S-2426 00 KAIG3-RFI-PG-S-2426-00
KAIG3-RFI-MB-S-2419 00 KAIG3-RFI-MB-S-2419-00
KAIG3-RFI-MB-S-2418 00 KAIG3-RFI-MB-S-2418-00
KAIG3-RFI-AG-S-2414 00 KAIG3-RFI-AG-S-2414-00
KAIG3-RFI-CO-S-2424 00 KAIG3-RFI-CO-S-2424-00
KAIG3-RFI-SW-S-2415 00 KAIG3-RFI-SW-S-2415-00
KAIG3-RFI-CO-S-2425 00 KAIG3-RFI-CO-S-2425-00
KAIG3-RFI-PA-S-2417 00 KAIG3-RFI-PA-S-2417-00
KAIG3-RFI-CO-SU-1247 00 KAIG3-RFI-CO-SU-1247-00
KAIG3-RFI-PA-S-2416 00 KAIG3-RFI-PA-S-2416-00
KAIG3-RFI-CO-SU-1248 00 KAIG3-RFI-CO-SU-1248-00
KAIG3-RFI-SW-SU-1249 00 KAIG3-RFI-SW-SU-1249-00
KAIG3-RFI-SW-S-2427 00 KAIG3-RFI-SW-S-2427-00
KAIG3-RFI-DG-C-0077 00 KAIG3-RFI-DG-C-0077-00
KAIG3-RFI-TG-C-0076 00 KAIG3-RFI-TG-C-0076-00
KAIG3-RFI-AG-C-0075 00 KAIG3-RFI-AG-C-0075-00
KAIG3-RFI-CO-S-2398 00 KAIG3-RFI-CO-S-2398-00
KAIG3-RFI-CO-S-2399 00 KAIG3-RFI-CO-S-2399-00
KAIG3-RFI-CO-S-2400 00 KAIG3-RFI-CO-S-2400-00
KAIG3-RFI-WG-SU-1245 00 KAIG3-RFI-WG-SU-1245-00
KAIG3-RFI-CO-SU-1243 00 KAIG3-RFI-CO-SU-1243-00
KAIG3-RFI-WG-S-2412 00 KAIG3-RFI-WG-S-2412-00
KAIG3-RFI-WG-S-2411 00 KAIG3-RFI-WG-S-2411-00
KAIG3-RFI-WG-S-2403 00 KAIG3-RFI-WG-S-2403-00
KAIG3-RFI-TG-LS-0302 00 KAIG3-RFI-TG-LS-0302-00
KAIG3-RFI-SW-S-2402 00 KAIG3-RFI-SW-S-2402-00
KAIG3-RFI-SW-S-2401-00 00 KAIG3-RFI-SW-S-2401-00-00
KAIG3-RFI-SW-A-0397 00 KAIG3-RFI-SW-A-0397-00
KAIG3-RFI-AG-SU-1246 00 KAIG3-RFI-AG-SU-1246-00
KAIG3-RFI-AG-S-2413 00 KAIG3-RFI-AG-S-2413-00
KAIG3-RFI-SW-SU-1244 00 KAIG3-RFI-SW-SU-1244-00
KAIG3-RFI-SW-SU-1040 01 KAIG3-RFI-SW-SU-1040-01
KAIG3-RFI-WG-SU-1241 00 KAIG3-RFI-WG-SU-1241-00
KAIG3-RFI-WG-S-2395 00 KAIG3-RFI-WG-S-2395-00
KAIG3-RFI-WG-S-2391 00 KAIG3-RFI-WG-S-2391-00
KAIG3-RFI-WG-S-2141 01 KAIG3-RFI-WG-S-2141-01
KAIG3-RFI-TG-S-2394 00 KAIG3-RFI-TG-S-2394-00
KAIG3-RFI-SW-A-0396 00 KAIG3-RFI-SW-A-0396-00
KAIG3-RFI-SW-A-0395 00 KAIG3-RFI-SW-A-0395-00
KAIG3-RFI-SW-A-0297 02 KAIG3-RFI-SW-A-0297-02
KAIG3-RFI-MB-SU-1242 00 KAIG3-RFI-MB-SU-1242-00
KAIG3-RFI-MB-S-2397 00 KAIG3-RFI-MB-S-2397-00
KAIG3-RFI-MB-S-2396 00 KAIG3-RFI-MB-S-2396-00
KAIG3-RFI-DG-SU-1240 00 KAIG3-RFI-DG-SU-1240-00
KAIG3-RFI-DG-S-2392 00 KAIG3-RFI-DG-S-2392-00
KAIG3-RFI-AG-S-2393 00 KAIG3-RFI-AG-S-2393-00
KAIG3-RFI-AG-S-2389 00 KAIG3-RFI-AG-S-2389-00
KAIG3-RFI-AG-S-2388 00 KAIG3-RFI-AG-S-2388-00
KAIG3-RFI-AG-S-2387 00 KAIG3-RFI-AG-S-2387-00
KAIG3-RFI-AG-S-2386 00 KAIG3-RFI-AG-S-2386-00
KAIG3-RFI-AG-S-2385 00 KAIG3-RFI-AG-S-2385-00
KAIG3-RFI-AG-S-2384 00 KAIG3-RFI-AG-S-2384-00
KAIG3-RFI-AG-S-2383 00 KAIG3-RFI-AG-S-2383-00
KAIG3-RFI-SW-LS-0301 00 KAIG3-RFI-SW-LS-0301-00
KAIG3-RFI-PA-S-2390 00 KAIG3-RFI-PA-S-2390-00
KAIG3-RFI-SW-SU-1239 00 KAIG3-RFI-SW-SU-1239-00
KAIG3-RFI-AG-E-0164 00 KAIG3-RFI-AG-E-0164-00
KAIG3-RFI-SW-SU-1238 00 KAIG3-RFI-SW-SU-1238-00
KAIG3-RFI-SW-S-2382 00 KAIG3-RFI-SW-S-2382-00
KAIG3-RFI-WG-E-0158 01 KAIG3-RFI-WG-E-0158-01
KAIG3-RFI-ZG-LS-0299 00 KAIG3-RFI-ZG-LS-0299-00
KAIG3-RFI-WG-S-2381 00 KAIG3-RFI-WG-S-2381-00
KAIG3-RFI-SW-S-2378 00 KAIG3-RFI-SW-S-2378-00
KAIG3-RFI-AG-S-2377 00 KAIG3-RFI-AG-S-2377-00
KAIG3-RFI-SW-S-2379 00 KAIG3-RFI-SW-S-2379-00
KAIG3-RFI-SW-LS-0300 00 KAIG3-RFI-SW-LS-0300-00
KAIG3-RFI-PA-S-2380 00 KAIG3-RFI-PA-S-2380-00
KAIG3-RFI-CO-SU-1228 00 KAIG3-RFI-CO-SU-1228-00
KAIG3-RFI-CO-SU-1229 00 KAIG3-RFI-CO-SU-1229-00
KAIG3-RFI-CO-SU-1237 00 KAIG3-RFI-CO-SU-1237-00
KAIG3-RFI-CO-S-2373 00 KAIG3-RFI-CO-S-2373-00
KAIG3-RFI-CO-S-2374 00 KAIG3-RFI-CO-S-2374-00
KAIG3-RFI-CO-S-2375 00 KAIG3-RFI-CO-S-2375-00
KAIG3-RFI-CO-S-2376 00 KAIG3-RFI-CO-S-2376-00
KAIG3-RFI-CO-S-2366 00 KAIG3-RFI-CO-S-2366-00
KAIG3-RFI-CO-S-2365 00 KAIG3-RFI-CO-S-2365-00
KAIG3-RFI-PG-SU-1236 00 KAIG3-RFI-PG-SU-1236-00
KAIG3-RFI-CO-S-2364 00 KAIG3-RFI-CO-S-2364-00
KAIG3-RFI-PG-SU-1235 00 KAIG3-RFI-PG-SU-1235-00
KAIG3-RFI-CO-S-2363 00 KAIG3-RFI-CO-S-2363-00
KAIG3-RFI-PG-S-2372 00 KAIG3-RFI-PG-S-2372-00
KAIG3-RFI-CO-S-2362 00 KAIG3-RFI-CO-S-2362-00
KAIG3-RFI-PG-S-2371 00 KAIG3-RFI-PG-S-2371-00
KAIG3-RFI-CO-S-2361 00 KAIG3-RFI-CO-S-2361-00
KAIG3-RFI-PG-S-2370 00 KAIG3-RFI-PG-S-2370-00
KAIG3-RFI-WG-SU-1233 00 KAIG3-RFI-WG-SU-1233-00
KAIG3-RFI-TG-SU-1232 00 KAIG3-RFI-TG-SU-1232-00
KAIG3-RFI-SW-S-2369 00 KAIG3-RFI-SW-S-2369-00
KAIG3-RFI-SW-S-2368 00 KAIG3-RFI-SW-S-2368-00
KAIG3-RFI-SW-S-2219 00 KAIG3-RFI-SW-S-2219-00
KAIG3-RFI-DG-SU-1230 00 KAIG3-RFI-DG-SU-1230-00
KAIG3-RFI-AG-SU-1234 00 KAIG3-RFI-AG-SU-1234-00
KAIG3-RFI-AG-SU-1231 00 KAIG3-RFI-AG-SU-1231-00
KAIG3-RFI-AG-S-2367 00 KAIG3-RFI-AG-S-2367-00
KAIG3-RFI-SW-S-2360 00 KAIG3-RFI-SW-S-2360-00
KAIG3-RFI-PA-S-2359 00 KAIG3-RFI-PA-S-2359-00
KAIG3-RFI-CO-SU-1227 00 KAIG3-RFI-CO-SU-1227-00
KAIG3-RFI-CO-S-2345 00 KAIG3-RFI-CO-S-2345-00
KAIG3-RFI-CO-S-2346 00 KAIG3-RFI-CO-S-2346-00
KAIG3-RFI-CO-S-2347 00 KAIG3-RFI-CO-S-2347-00
KAIG3-RFI-CO-S-2355 00 KAIG3-RFI-CO-S-2355-00
KAIG3-RFI-CO-S-2356 00 KAIG3-RFI-CO-S-2356-00
KAIG3-RFI-CO-S-2357 00 KAIG3-RFI-CO-S-2357-00
KAIG3-RFI-SW-S-2354 00 KAIG3-RFI-SW-S-2354-00
KAIG3-RFI-SW-A-0394 00 KAIG3-RFI-SW-A-0394-00
KAIG3-RFI-SW-A-0393 00 KAIG3-RFI-SW-A-0393-00
KAIG3-RFI-SW-A-0392 00 KAIG3-RFI-SW-A-0392-00
KAIG3-RFI-PG-S-2358 00 KAIG3-RFI-PG-S-2358-00
KAIG3-RFI-MB-S-2329 00 KAIG3-RFI-MB-S-2329-00
KAIG3-RFI-AG-C-0071 00 KAIG3-RFI-AG-C-0071-00
KAIG3-RFI-BO-S-0754 01 KAIG3-RFI-BO-S-0754-01
KAIG3-RFI-BG-P-0072 00 KAIG3-RFI-BG-P-0072-00
KAIG3-RFI-AG-S-2349 00 KAIG3-RFI-AG-S-2349-00
KAIG3-RFI-AG-S-2348 00 KAIG3-RFI-AG-S-2348-00
KAIG3-RFI-AG-P-0073 00 KAIG3-RFI-AG-P-0073-00
KAIG3-RFI-MB-P-0074 00 KAIG3-RFI-MB-P-0074-00
KAIG3-RFI-PA-S-2353 00 KAIG3-RFI-PA-S-2353-00
KAIG3-RFI-PA-S-2352 00 KAIG3-RFI-PA-S-2352-00
KAIG3-RFI-PA-S-2351 00 KAIG3-RFI-PA-S-2351-00
KAIG3-RFI-PA-S-2350 00 KAIG3-RFI-PA-S-2350-00
KAIG3-RFI-MB-M-0070 00 KAIG3-RFI-MB-M-0070-00
KAIG3-RFI-WG-S-2343 00 KAIG3-RFI-WG-S-2343-00
KAIG3-RFI-PG-SU-1224 00 KAIG3-RFI-PG-SU-1224-00
KAIG3-RFI-PG-S-2344 00 KAIG3-RFI-PG-S-2344-00
KAIG3-RFI-MB-S-2342 00 KAIG3-RFI-MB-S-2342-00
KAIG3-RFI-MB-S-2341 00 KAIG3-RFI-MB-S-2341-00
KAIG3-RFI-MB-A-0391 00 KAIG3-RFI-MB-A-0391-00
KAIG3-RFI-AG-SU-1226 00 KAIG3-RFI-AG-SU-1226-00
KAIG3-RFI-AG-SU-1225 00 KAIG3-RFI-AG-SU-1225-00
KAIG3-RFI-SW-S-2340 00 KAIG3-RFI-SW-S-2340-00
KAIG3-RFI-SW-LS-0298 00 KAIG3-RFI-SW-LS-0298-00
KAIG3-RFI-AG-LC-0149 00 KAIG3-RFI-AG-LC-0149-00
KAIG3-RFI-AG-E-0163 00 KAIG3-RFI-AG-E-0163-00
KAIG3-RFI-AG-S-2331 00 KAIG3-RFI-AG-S-2331-00
KAIG3-RFI-AG-S-2305 00 KAIG3-RFI-AG-S-2305-00
KAIG3-RFI-CO-S-2333 00 KAIG3-RFI-CO-S-2333-00
KAIG3-RFI-CO-S-2334 00 KAIG3-RFI-CO-S-2334-00
KAIG3-RFI-SW-S-2330 00 KAIG3-RFI-SW-S-2330-00
KAIG3-RFI-CO-S-2335 00 KAIG3-RFI-CO-S-2335-00
KAIG3-RFI-CO-S-2336 00 KAIG3-RFI-CO-S-2336-00
KAIG3-RFI-PA-S-2332 00 KAIG3-RFI-PA-S-2332-00
KAIG3-RFI-CO-S-2337 00 KAIG3-RFI-CO-S-2337-00
KAIG3-RFI-AG-E-0162 00 KAIG3-RFI-AG-E-0162-00
KAIG3-RFI-CO-S-2338 00 KAIG3-RFI-CO-S-2338-00
KAIG3-RFI-CO-S-2339 00 KAIG3-RFI-CO-S-2339-00
KAIG3-RFI-CO-SU-1222 00 KAIG3-RFI-CO-SU-1222-00
KAIG3-RFI-SW-SU-1223 00 KAIG3-RFI-SW-SU-1223-00
KAIG3-RFI-SW-LS-0297 00 KAIG3-RFI-SW-LS-0297-00
KAIG3-RFI-CO-S-2318 00 KAIG3-RFI-CO-S-2318-00
KAIG3-RFI-SW-LS-0296 00 KAIG3-RFI-SW-LS-0296-00
KAIG3-RFI-CO-S-2316 00 KAIG3-RFI-CO-S-2316-00
KAIG3-RFI-CO-S-2317 00 KAIG3-RFI-CO-S-2317-00
KAIG3-RFI-CO-SU-1218 00 KAIG3-RFI-CO-SU-1218-00
KAIG3-RFI-CO-S-2319 00 KAIG3-RFI-CO-S-2319-00
KAIG3-RFI-CO-S-2320 00 KAIG3-RFI-CO-S-2320-00
KAIG3-RFI-CO-S-2321 00 KAIG3-RFI-CO-S-2321-00
KAIG3-RFI-CO-SU-1219 00 KAIG3-RFI-CO-SU-1219-00
KAIG3-RFI-CO-SU-1220 00 KAIG3-RFI-CO-SU-1220-00
KAIG3-RFI-CO-S-2325 00 KAIG3-RFI-CO-S-2325-00
KAIG3-RFI-AG-LC-0142 01 KAIG3-RFI-AG-LC-0142-01
KAIG3-RFI-ZG-S-2314 00 KAIG3-RFI-ZG-S-2314-00
KAIG3-RFI-WG-S-2310 00 KAIG3-RFI-WG-S-2310-00
KAIG3-RFI-TG-S-2313 00 KAIG3-RFI-TG-S-2313-00
KAIG3-RFI-PG-SU-1221 00 KAIG3-RFI-PG-SU-1221-00
KAIG3-RFI-PG-SU-1217 00 KAIG3-RFI-PG-SU-1217-00
KAIG3-RFI-PG-S-2327 00 KAIG3-RFI-PG-S-2327-00
KAIG3-RFI-PG-S-2315 00 KAIG3-RFI-PG-S-2315-00
KAIG3-RFI-PG-S-2311 00 KAIG3-RFI-PG-S-2311-00
KAIG3-RFI-PG-S-2306 00 KAIG3-RFI-PG-S-2306-00
KAIG3-RFI-MB-S-2328 00 KAIG3-RFI-MB-S-2328-00
KAIG3-RFI-DG-S-2312 00 KAIG3-RFI-DG-S-2312-00
KAIG3-RFI-AG-S-2309 00 KAIG3-RFI-AG-S-2309-00
KAIG3-RFI-SW-LS-0285 01 KAIG3-RFI-SW-LS-0285-01
KAIG3-RFI-PA-S-2324 00 KAIG3-RFI-PA-S-2324-00
KAIG3-RFI-PA-S-2323 00 KAIG3-RFI-PA-S-2323-00
KAIG3-RFI-PA-S-2322 00 KAIG3-RFI-PA-S-2322-00
KAIG3-RFI-PA-A-0390 00 KAIG3-RFI-PA-A-0390-00
KAIG3-RFI-SW-S-2326 00 KAIG3-RFI-SW-S-2326-00
KAIG3-RFI-PG-LC-0148 00 KAIG3-RFI-PG-LC-0148-00
KAIG3-RFI-PG-LC-0147 00 KAIG3-RFI-PG-LC-0147-00
KAIG3-RFI-PG-LC-0146 00 KAIG3-RFI-PG-LC-0146-00
KAIG3-RFI-TT-P-0069 00 KAIG3-RFI-TT-P-0069-00
KAIG3-RFI-MB-P-0068 00 KAIG3-RFI-MB-P-0068-00
KAIG3-RFI-PG-LC-0145 00 KAIG3-RFI-PG-LC-0145-00
KAIG3-RFI-PG-LC-0144 00 KAIG3-RFI-PG-LC-0144-00
KAIG3-RFI-PG-LC-0143 00 KAIG3-RFI-PG-LC-0143-00
KAIG3-RFI-CO-S-2191 01 KAIG3-RFI-CO-S-2191-01
KAIG3-RFI-CO-S-2186 01 KAIG3-RFI-CO-S-2186-01
KAIG3-RFI-CO-S-2107 01 KAIG3-RFI-CO-S-2107-01
KAIG3-RFI-WG-SU-1215 00 KAIG3-RFI-WG-SU-1215-00
KAIG3-RFI-WG-SU-1214 00 KAIG3-RFI-WG-SU-1214-00
KAIG3-RFI-CO-S-2308 00 KAIG3-RFI-CO-S-2308-00
KAIG3-RFI-CO-S-2307 00 KAIG3-RFI-CO-S-2307-00
KAIG3-RFI-AG-SU-1216 00 KAIG3-RFI-AG-SU-1216-00
KAIG3-RFI-SW-S-2290 00 KAIG3-RFI-SW-S-2290-00
KAIG3-RFI-SW-LS-0295 00 KAIG3-RFI-SW-LS-0295-00
KAIG3-RFI-PA-S-2296 00 KAIG3-RFI-PA-S-2296-00
KAIG3-RFI-PA-S-2295 00 KAIG3-RFI-PA-S-2295-00
KAIG3-RFI-PA-S-2294 00 KAIG3-RFI-PA-S-2294-00
KAIG3-RFI-PA-A-0389 00 KAIG3-RFI-PA-A-0389-00
KAIG3-RFI-PA-A-0388 00 KAIG3-RFI-PA-A-0388-00
KAIG3-RFI-PG-E-0161 00 KAIG3-RFI-PG-E-0161-00
KAIG3-RFI-PG-E-0160 00 KAIG3-RFI-PG-E-0160-00
KAIG3-RFI-ZG-LS-0294 00 KAIG3-RFI-ZG-LS-0294-00
KAIG3-RFI-PG-SU-1212 00 KAIG3-RFI-PG-SU-1212-00
KAIG3-RFI-PG-S-2304 00 KAIG3-RFI-PG-S-2304-00
KAIG3-RFI-PG-S-2303 00 KAIG3-RFI-PG-S-2303-00
KAIG3-RFI-AG-SU-1213 00 KAIG3-RFI-AG-SU-1213-00
KAIG3-RFI-SW-LS-0293 00 KAIG3-RFI-SW-LS-0293-00
KAIG3-RFI-AG-C-0064 00 KAIG3-RFI-AG-C-0064-00
KAIG3-RFI-SW-S-2302 00 KAIG3-RFI-SW-S-2302-00
KAIG3-RFI-SW-S-2301 00 KAIG3-RFI-SW-S-2301-00
KAIG3-RFI-SW-S-2300 00 KAIG3-RFI-SW-S-2300-00
KAIG3-RFI-CO-SU-1211 00 KAIG3-RFI-CO-SU-1211-00
KAIG3-RFI-CO-S-2297 00 KAIG3-RFI-CO-S-2297-00
KAIG3-RFI-CO-S-2293 00 KAIG3-RFI-CO-S-2293-00
KAIG3-RFI-SW-S-2299 00 KAIG3-RFI-SW-S-2299-00
KAIG3-RFI-CO-S-2292 00 KAIG3-RFI-CO-S-2292-00
KAIG3-RFI-CO-S-2291 00 KAIG3-RFI-CO-S-2291-00
KAIG3-RFI-SW-S-2298 00 KAIG3-RFI-SW-S-2298-00
KAIG3-RFI-SW-S-2289 00 KAIG3-RFI-SW-S-2289-00
KAIG3-RFI-SW-LS-0292 00 KAIG3-RFI-SW-LS-0292-00
KAIG3-RFI-PA-S-2288 00 KAIG3-RFI-PA-S-2288-00
KAIG3-RFI-AG-LC-0142 00 KAIG3-RFI-AG-LC-0142-00
KAIG3-RFI-AG-E-0159 00 KAIG3-RFI-AG-E-0159-00
KAIG3-RFI-DG-C-0067 00 KAIG3-RFI-DG-C-0067-00
KAIG3-RFI-SW-SU-1199 01 KAIG3-RFI-SW-SU-1199-01
KAIG3-RFI-SW-S-1551 01 KAIG3-RFI-SW-S-1551-01
KAIG3-RFI-PA-S-2287 00 KAIG3-RFI-PA-S-2287-00
KAIG3-RFI-PA-S-2286 00 KAIG3-RFI-PA-S-2286-00
KAIG3-RFI-PA-S-2285 00 KAIG3-RFI-PA-S-2285-00
KAIG3-RFI-PA-S-2284 00 KAIG3-RFI-PA-S-2284-00
KAIG3-RFI-PA-S-2283 00 KAIG3-RFI-PA-S-2283-00
KAIG3-RFI-GN-C-0002 00 KAIG3-RFI-GN-C-0002-00
KAIG-IR-ZHBG-GN-C-03 00 KAIG-IR-ZHBG-GN-C-03-00
KAIG-FIR-ZHBG-BO-A-01 00 KAIG-FIR-ZHBG-BO-A-01-00
KAIG3-RFI-WG-SU-1207 00 KAIG3-RFI-WG-SU-1207-00
KAIG3-RFI-WG-S-2269 00 KAIG3-RFI-WG-S-2269-00
KAIG3-RFI-SW-S-2282 00 KAIG3-RFI-SW-S-2282-00
KAIG3-RFI-SW-A-0384 01 KAIG3-RFI-SW-A-0384-01
KAIG3-RFI-MB-S-2271 00 KAIG3-RFI-MB-S-2271-00
KAIG3-RFI-AG-S-2281 00 KAIG3-RFI-AG-S-2281-00
KAIG3-RFI-AG-S-2280 00 KAIG3-RFI-AG-S-2280-00
KAIG3-RFI-AG-S-2279 00 KAIG3-RFI-AG-S-2279-00
KAIG3-RFI-AG-S-2278 00 KAIG3-RFI-AG-S-2278-00
KAIG3-RFI-AG-S-2277 00 KAIG3-RFI-AG-S-2277-00
KAIG3-RFI-AG-S-2276 00 KAIG3-RFI-AG-S-2276-00
KAIG3-RFI-AG-S-2275 00 KAIG3-RFI-AG-S-2275-00
KAIG3-RFI-AG-S-2238 00 KAIG3-RFI-AG-S-2238-00
KAIG3-RFI-SW-LS-0291 00 KAIG3-RFI-SW-LS-0291-00
KAIG3-RFI-PA-S-2274 00 KAIG3-RFI-PA-S-2274-00
KAIG3-RFI-PA-S-2273 00 KAIG3-RFI-PA-S-2273-00
KAIG3-RFI-PA-S-2272 00 KAIG3-RFI-PA-S-2272-00
KAIG3-RFI-PA-S-2268 00 KAIG3-RFI-PA-S-2268-00
KAIG3-RFI-SW-SU-1209 00 KAIG3-RFI-SW-SU-1209-00
KAIG3-RFI-CO-S-2262 00 KAIG3-RFI-CO-S-2262-00
KAIG3-RFI-CO-S-2263 00 KAIG3-RFI-CO-S-2263-00
KAIG3-RFI-CO-S-2260 00 KAIG3-RFI-CO-S-2260-00
KAIG3-RFI-CO-S-2261 00 KAIG3-RFI-CO-S-2261-00
KAIG3-RFI-CO-S-1985 01 KAIG3-RFI-CO-S-1985-01
KAIG3-RFI-CO-S-2264 00 KAIG3-RFI-CO-S-2264-00
KAIG3-RFI-CO-S-2265 00 KAIG3-RFI-CO-S-2265-00
KAIG3-RFI-CO-SU-1208 00 KAIG3-RFI-CO-SU-1208-00
KAIG3-RFI-CO-SU-1206 00 KAIG3-RFI-CO-SU-1206-00
KAIG3-RFI-CO-SU-1210 00 KAIG3-RFI-CO-SU-1210-00
KAIG3-RFI-CO-S-2259 00 KAIG3-RFI-CO-S-2259-00
KAIG3-RFI-CO-S-2258 00 KAIG3-RFI-CO-S-2258-00
KAIG3-RFI-CO-S-2257 00 KAIG3-RFI-CO-S-2257-00
KAIG3-RFI-CO-S-2256 00 KAIG3-RFI-CO-S-2256-00
KAIG3-RFI-CO-S-2255 00 KAIG3-RFI-CO-S-2255-00
KAIG3-RFI-CO-S-2254 00 KAIG3-RFI-CO-S-2254-00
KAIG3-RFI-CO-S-2253 00 KAIG3-RFI-CO-S-2253-00
KAIG3-RFI-PA-S-2252 00 KAIG3-RFI-PA-S-2252-00
KAIG3-RFI-PA-S-2251 00 KAIG3-RFI-PA-S-2251-00
KAIG3-RFI-PA-S-2250 00 KAIG3-RFI-PA-S-2250-00
KAIG3-RFI-PA-S-2249 00 KAIG3-RFI-PA-S-2249-00
KAIG3-RFI-PA-S-2248 00 KAIG3-RFI-PA-S-2248-00
KAIG3-RFI-SW-LS-0290 00 KAIG3-RFI-SW-LS-0290-00
KAIG3-RFI-SW-SU-1205 00 KAIG3-RFI-SW-SU-1205-00
KAIG3-RFI-WG-SU-1203 00 KAIG3-RFI-WG-SU-1203-00
KAIG3-RFI-AG-SU-1204 00 KAIG3-RFI-AG-SU-1204-00
KAIG3-RFI-AG-C-0066 00 KAIG3-RFI-AG-C-0066-00
KAIG3-RFI-SG-C-0065 00 KAIG3-RFI-SG-C-0065-00
KAIG3-RFI-SW-S-1719 01 KAIG3-RFI-SW-S-1719-01
KAIG3-RFI-SW-S-2156 01 KAIG3-RFI-SW-S-2156-01
KAIG3-RFI-SW-LS-0289 00 KAIG3-RFI-SW-LS-0289-00
KAIG3-RFI-SW-LS-0288 00 KAIG3-RFI-SW-LS-0288-00
KAIG3-RFI-ZG-SU-1201 00 KAIG3-RFI-ZG-SU-1201-00
KAIG3-RFI-SW-S-2244 00 KAIG3-RFI-SW-S-2244-00
KAIG3-RFI-CO-S-2245 00 KAIG3-RFI-CO-S-2245-00
KAIG3-RFI-CO-S-2246 00 KAIG3-RFI-CO-S-2246-00
KAIG3-RFI-CO-S-2247 00 KAIG3-RFI-CO-S-2247-00
KAIG3-RFI-WG-SU-1178 01 KAIG3-RFI-WG-SU-1178-01
KAIG3-RFI-TB-S-2234 00 KAIG3-RFI-TB-S-2234-00
KAIG3-RFI-SG-S-2239 00 KAIG3-RFI-SG-S-2239-00
KAIG3-RFI-PG-S-2233-00 00 KAIG3-RFI-PG-S-2233-00-00
KAIG3-RFI-PG-S-2232 00 KAIG3-RFI-PG-S-2232-00
KAIG3-RFI-PG-S-2231 00 KAIG3-RFI-PG-S-2231-00
KAIG3-RFI-PG-S-2230 00 KAIG3-RFI-PG-S-2230-00
KAIG3-RFI-PG-S-2229 00 KAIG3-RFI-PG-S-2229-00
KAIG3-RFI-PG-S-2228 00 KAIG3-RFI-PG-S-2228-00
KAIG3-RFI-PG-S-2227 00 KAIG3-RFI-PG-S-2227-00
KAIG3-RFI-MB-S-2243 00 KAIG3-RFI-MB-S-2243-00
KAIG3-RFI-MB-S-2242 00 KAIG3-RFI-MB-S-2242-00
KAIG3-RFI-MB-S-2240-00 00 KAIG3-RFI-MB-S-2240-00-00
KAIG3-RFI-SW-SU-1199 00 KAIG3-RFI-SW-SU-1199-00
KAIG3-RFI-SW-LS-0287 00 KAIG3-RFI-SW-LS-0287-00
KAIG3-RFI-SW-LS-0286 00 KAIG3-RFI-SW-LS-0286-00
KAIG3-RFI-SW-SU-1202 00 KAIG3-RFI-SW-SU-1202-00
KAIG3-RFI-PG-SU-1200 00 KAIG3-RFI-PG-SU-1200-00
KAIG3-RFI-PG-SU-1198 00 KAIG3-RFI-PG-SU-1198-00
KAIG3-RFI-PG-S-2237 00 KAIG3-RFI-PG-S-2237-00
KAIG3-RFI-AG-SU-1197 00 KAIG3-RFI-AG-SU-1197-00
KAIG3-RFI-AG-S-2226 00 KAIG3-RFI-AG-S-2226-00
KAIG3-RFI-PA-S-2236 00 KAIG3-RFI-PA-S-2236-00
KAIG3-RFI-PA-S-2235 00 KAIG3-RFI-PA-S-2235-00
KAIG3-RFI-PA-S-2225 00 KAIG3-RFI-PA-S-2225-00
KAIG3-RFI-CO-S-2224 00 KAIG3-RFI-CO-S-2224-00
KAIG3-RFI-CO-S-2223 00 KAIG3-RFI-CO-S-2223-00
KAIG3-RFI-CO-S-2222 00 KAIG3-RFI-CO-S-2222-00
KAIG3-RFI-CO-S-2221 00 KAIG3-RFI-CO-S-2221-00
KAIG3-RFI-CO-S-2220 00 KAIG3-RFI-CO-S-2220-00
KAIG3-RFI-CO-S-2218 00 KAIG3-RFI-CO-S-2218-00
KAIG3-RFI-CO-S-2217 00 KAIG3-RFI-CO-S-2217-00
KAIG3-RFI-SW-S-2216 00 KAIG3-RFI-SW-S-2216-00
KAIG3-RFI-SW-A-0384 00 KAIG3-RFI-SW-A-0384-00
KAIG3-RFI-PG-S-2195 00 KAIG3-RFI-PG-S-2195-00
KAIG3-RFI-DG-S-2213 00 KAIG3-RFI-DG-S-2213-00
KAIG3-RFI-DG-A-0387 00 KAIG3-RFI-DG-A-0387-00
KAIG3-RFI-DG-A-0386 00 KAIG3-RFI-DG-A-0386-00
KAIG3-RFI-DG-A-0385 00 KAIG3-RFI-DG-A-0385-00
KAIG3-RFI-AG-SU-1196 00 KAIG3-RFI-AG-SU-1196-00
KAIG3-RFI-AG-S-2214 00 KAIG3-RFI-AG-S-2214-00
KAIG3-RFI-SW-LS-0285 00 KAIG3-RFI-SW-LS-0285-00
KAIG3-RFI-PA-S-2215 00 KAIG3-RFI-PA-S-2215-00
KAIG3-RFI-ZG-E-0156 00 KAIG3-RFI-ZG-E-0156-00
KAIG3-RFI-DG-E-0155 00 KAIG3-RFI-DG-E-0155-00
KAIG3-RFI-CO-S-2204 00 KAIG3-RFI-CO-S-2204-00
KAIG3-RFI-CO-S-2205 00 KAIG3-RFI-CO-S-2205-00
KAIG3-RFI-CO-S-2207 00 KAIG3-RFI-CO-S-2207-00
KAIG3-RFI-CO-S-2206 00 KAIG3-RFI-CO-S-2206-00
KAIG3-RFI-CO-S-2208 00 KAIG3-RFI-CO-S-2208-00
KAIG3-RFI-ZG-S-2212 00 KAIG3-RFI-ZG-S-2212-00
KAIG3-RFI-TG-S-2211 00 KAIG3-RFI-TG-S-2211-00
KAIG3-RFI-DG-S-2210 00 KAIG3-RFI-DG-S-2210-00
KAIG3-RFI-MB-S-2203 00 KAIG3-RFI-MB-S-2203-00
KAIG3-RFI-MB-S-2202 00 KAIG3-RFI-MB-S-2202-00
KAIG3-RFI-SW-S-2201 00 KAIG3-RFI-SW-S-2201-00
KAIG3-RFI-SW-LS-0284 00 KAIG3-RFI-SW-LS-0284-00
KAIG3-RFI-SW-LS-0283 00 KAIG3-RFI-SW-LS-0283-00
KAIG3-RFI-SW-LS-0282 00 KAIG3-RFI-SW-LS-0282-00
KAIG3-RFI-PA-S-2209 00 KAIG3-RFI-PA-S-2209-00
KAIG3-RFI-DG-S-2194-00 00 KAIG3-RFI-DG-S-2194-00-00
KAIG3-RFI-DG-S-2193 00 KAIG3-RFI-DG-S-2193-00
KAIG3-RFI-DG-S-2192-00 00 KAIG3-RFI-DG-S-2192-00-00
KAIG3-RFI-PG-LC-0141 00 KAIG3-RFI-PG-LC-0141-00
KAIG3-RFI-PG-LC-0140 00 KAIG3-RFI-PG-LC-0140-00
KAIG3-RFI-PG-LC-0139 00 KAIG3-RFI-PG-LC-0139-00
KAIG3-RFI-WG-LC-0138 00 KAIG3-RFI-WG-LC-0138-00
KAIG3-RFI-WG-E-0158 00 KAIG3-RFI-WG-E-0158-00
KAIG3-RFI-WG-E-0157 00 KAIG3-RFI-WG-E-0157-00
KAIG3-RFI-WG-SU-1195 00 KAIG3-RFI-WG-SU-1195-00
KAIG3-RFI-WG-S-2197 00 KAIG3-RFI-WG-S-2197-00
KAIG3-RFI-WG-S-2196 00 KAIG3-RFI-WG-S-2196-00
KAIG3-RFI-SW-A-0383 00 KAIG3-RFI-SW-A-0383-00
KAIG3-RFI-CO-S-2191 00 KAIG3-RFI-CO-S-2191-00
KAIG3-RFI-CO-S-2190 00 KAIG3-RFI-CO-S-2190-00
KAIG3-RFI-SW-S-2199 00 KAIG3-RFI-SW-S-2199-00
KAIG3-RFI-SW-S-2198 00 KAIG3-RFI-SW-S-2198-00
KAIG3-RFI-SW-LS-0281 00 KAIG3-RFI-SW-LS-0281-00
KAIG3-RFI-SW-LS-0280 00 KAIG3-RFI-SW-LS-0280-00
KAIG3-RFI-PA-S-2189 00 KAIG3-RFI-PA-S-2189-00
KAIG3-RFI-PA-S-2188 00 KAIG3-RFI-PA-S-2188-00
KAIG3-RFI-SW-SU-1125 01 KAIG3-RFI-SW-SU-1125-01
KAIG3-RFI-SW-S-2200 00 KAIG3-RFI-SW-S-2200-00
KAIG3-RFI-CO-GE-0459 00 KAIG3-RFI-CO-GE-0459-00
KAIG3-RFI-CO-SU-1189 00 KAIG3-RFI-CO-SU-1189-00
KAIG3-RFI-CO-S-2183 00 KAIG3-RFI-CO-S-2183-00
KAIG3-RFI-CO-S-2184 00 KAIG3-RFI-CO-S-2184-00
KAIG3-RFI-CO-S-2185 00 KAIG3-RFI-CO-S-2185-00
KAIG3-RFI-CO-S-2186 00 KAIG3-RFI-CO-S-2186-00
KAIG3-RFI-CO-S-2187 00 KAIG3-RFI-CO-S-2187-00
KAIG3-RFI-SW-S-1526 02 KAIG3-RFI-SW-S-1526-02
KAIG3-RFI-TB-S-1958 01 KAIG3-RFI-TB-S-1958-01
KAIG3-RFI-PG-SU-1192 00 KAIG3-RFI-PG-SU-1192-00
KAIG3-RFI-PG-SU-1191 00 KAIG3-RFI-PG-SU-1191-00
KAIG3-RFI-MB-S-2175 00 KAIG3-RFI-MB-S-2175-00
KAIG3-RFI-MB-S-2174 00 KAIG3-RFI-MB-S-2174-00
KAIG3-RFI-AG-SU-1193 00 KAIG3-RFI-AG-SU-1193-00
KAIG3-RFI-TB-A-0382 00 KAIG3-RFI-TB-A-0382-00
KAIG3-RFI-SW-S-2180 00 KAIG3-RFI-SW-S-2180-00
KAIG3-RFI-PA-S-2181 00 KAIG3-RFI-PA-S-2181-00
KAIG3-RFI-PA-S-2179 00 KAIG3-RFI-PA-S-2179-00
KAIG3-RFI-PA-S-2178 00 KAIG3-RFI-PA-S-2178-00
KAIG3-RFI-PA-S-2177 00 KAIG3-RFI-PA-S-2177-00
KAIG3-RFI-SW-SU-1194 00 KAIG3-RFI-SW-SU-1194-00
KAIG3-RFI-SW-S-2182 00 KAIG3-RFI-SW-S-2182-00
KAIG3-RFI-SW-P-0063 00 KAIG3-RFI-SW-P-0063-00
KAIG3-RFI-ZG-LC-0137 00 KAIG3-RFI-ZG-LC-0137-00
KAIG3-RFI-MB-S-2173 00 KAIG3-RFI-MB-S-2173-00
KAIG3-RFI-MB-S-2172 00 KAIG3-RFI-MB-S-2172-00
KAIG3-RFI-MB-A-0381 00 KAIG3-RFI-MB-A-0381-00
KAIG3-RFI-DG-S-2171 00 KAIG3-RFI-DG-S-2171-00
KAIG3-RFI-AG-SU-1190 00 KAIG3-RFI-AG-SU-1190-00
KAIG3-RFI-AG-S-2169 00 KAIG3-RFI-AG-S-2169-00
KAIG3-RFI-SW-LS-0255 01 KAIG3-RFI-SW-LS-0255-01
KAIG3-RFI-SW-LS-0238 01 KAIG3-RFI-SW-LS-0238-01
KAIG3-RFI-SW-LS-0216 01 KAIG3-RFI-SW-LS-0216-01
KAIG3-RFI-SW-LS-0214 01 KAIG3-RFI-SW-LS-0214-01
KAIG3-RFI-SW-LS-0219 01 KAIG3-RFI-SW-LS-0219-01
KAIG3-RFI-CO-S-2167 00 KAIG3-RFI-CO-S-2167-00
KAIG3-RFI-CO-S-2168 00 KAIG3-RFI-CO-S-2168-00
KAIG3-RFI-CO-S-2164 00 KAIG3-RFI-CO-S-2164-00
KAIG3-RFI-CO-S-2165 00 KAIG3-RFI-CO-S-2165-00
KAIG3-RFI-CO-S-2166 00 KAIG3-RFI-CO-S-2166-00
KAIG3-RFI-CO-SU-1188 00 KAIG3-RFI-CO-SU-1188-00
KAIG3-RFI-SW-S-2170 00 KAIG3-RFI-SW-S-2170-00
KAIG3-RFI-SW-LS-0279 00 KAIG3-RFI-SW-LS-0279-00
KAIG3-RFI-SW-LS-0278 00 KAIG3-RFI-SW-LS-0278-00
KAIG3-RFI-SW-LS-0277 00 KAIG3-RFI-SW-LS-0277-00
KAIG3-RFI-PA-S-2161 00 KAIG3-RFI-PA-S-2161-00
KAIG3-RFI-PA-S-2160 00 KAIG3-RFI-PA-S-2160-00
KAIG3-RFI-AG-C-0062 00 KAIG3-RFI-AG-C-0062-00
KAIG3-RFI-DG-LC-0136 00 KAIG3-RFI-DG-LC-0136-00
KAIG3-RFI-WG-S-2163 00 KAIG3-RFI-WG-S-2163-00
KAIG3-RFI-SG-SU-1186 00 KAIG3-RFI-SG-SU-1186-00
KAIG3-RFI-PG-SU-1187 00 KAIG3-RFI-PG-SU-1187-00
KAIG3-RFI-PG-S-2162 00 KAIG3-RFI-PG-S-2162-00
KAIG3-RFI-CO-SU-1184 00 KAIG3-RFI-CO-SU-1184-00
KAIG3-RFI-CO-GE-0458 00 KAIG3-RFI-CO-GE-0458-00
KAIG3-RFI-CO-SU-1185 00 KAIG3-RFI-CO-SU-1185-00
KAIG3-RFI-CO-S-2084 00 KAIG3-RFI-CO-S-2084-00
KAIG3-RFI-SW-S-2159 00 KAIG3-RFI-SW-S-2159-00
KAIG3-RFI-SW-S-2156 00 KAIG3-RFI-SW-S-2156-00
KAIG3-RFI-SW-LS-0256 01 KAIG3-RFI-SW-LS-0256-01
KAIG3-RFI-PA-S-2155 00 KAIG3-RFI-PA-S-2155-00
KAIG3-RFI-PA-S-2154 00 KAIG3-RFI-PA-S-2154-00
KAIG3-RFI-SW-LS-0276 00 KAIG3-RFI-SW-LS-0276-00
KAIG3-RFI-SW-LS-0217 01 KAIG3-RFI-SW-LS-0217-01
KAIG3-RFI-PG-S-2153 00 KAIG3-RFI-PG-S-2153-00
KAIG3-RFI-ZG-LS-0275 00 KAIG3-RFI-ZG-LS-0275-00
KAIG3-RFI-WG-S-2157 00 KAIG3-RFI-WG-S-2157-00
KAIG3-RFI-WG-S-2140 00 KAIG3-RFI-WG-S-2140-00
KAIG3-RFI-SW-A-0351 02 KAIG3-RFI-SW-A-0351-02
KAIG3-RFI-DG-S-2158 00 KAIG3-RFI-DG-S-2158-00
KAIG3-RFI-SW-S-2147 00 KAIG3-RFI-SW-S-2147-00
KAIG3-RFI-WG-SU-1183 00 KAIG3-RFI-WG-SU-1183-00
KAIG3-RFI-WG-LS-0272 00 KAIG3-RFI-WG-LS-0272-00
KAIG3-RFI-SW-S-2152 00 KAIG3-RFI-SW-S-2152-00
KAIG3-RFI-SW-A-0380 00 KAIG3-RFI-SW-A-0380-00
KAIG3-RFI-DG-SU-1180 00 KAIG3-RFI-DG-SU-1180-00
KAIG3-RFI-DG-S-2151 00 KAIG3-RFI-DG-S-2151-00
KAIG3-RFI-AG-SU-1181 00 KAIG3-RFI-AG-SU-1181-00
KAIG3-RFI-PG-C-0061 00 KAIG3-RFI-PG-C-0061-00
KAIG3-RFI-DG-C-0060 00 KAIG3-RFI-DG-C-0060-00
KAIG3-RFI-CO-SU-1182 00 KAIG3-RFI-CO-SU-1182-00
KAIG3-RFI-CO-S-2148 00 KAIG3-RFI-CO-S-2148-00
KAIG3-RFI-CO-S-2149 00 KAIG3-RFI-CO-S-2149-00
KAIG3-RFI-CO-S-2150 00 KAIG3-RFI-CO-S-2150-00
KAIG3-RFI-SW-S-2146 00 KAIG3-RFI-SW-S-2146-00
KAIG3-RFI-SW-LS-0274 00 KAIG3-RFI-SW-LS-0274-00
KAIG3-RFI-SW-LS-0273 00 KAIG3-RFI-SW-LS-0273-00
KAIG3-RFI-SW-S-2145 00 KAIG3-RFI-SW-S-2145-00
KAIG3-RFI-PA-S-2144 00 KAIG3-RFI-PA-S-2144-00
KAIG3-RFI-PA-S-2143 00 KAIG3-RFI-PA-S-2143-00
KAIG3-RFI-PG-E-0154 00 KAIG3-RFI-PG-E-0154-00
KAIG3-RFI-PG-E-0153 00 KAIG3-RFI-PG-E-0153-00
KAIG3-RFI-PG-LC-0135 00 KAIG3-RFI-PG-LC-0135-00
KAIG3-RFI-PG-LC-0134 00 KAIG3-RFI-PG-LC-0134-00
KAIG3-RFI-PG-LC-0133 00 KAIG3-RFI-PG-LC-0133-00
KAIG3-RFI-CO-S-2134 00 KAIG3-RFI-CO-S-2134-00
KAIG3-RFI-CO-S-2133 00 KAIG3-RFI-CO-S-2133-00
KAIG3-RFI-CO-S-2132 00 KAIG3-RFI-CO-S-2132-00
KAIG3-RFI-CO-S-2131 00 KAIG3-RFI-CO-S-2131-00
KAIG3-RFI-CO-S-2130 00 KAIG3-RFI-CO-S-2130-00
KAIG3-RFI-CO-S-2129 00 KAIG3-RFI-CO-S-2129-00
KAIG3-RFI-CO-S-2128 00 KAIG3-RFI-CO-S-2128-00
KAIG3-RFI-CO-GE-0457 00 KAIG3-RFI-CO-GE-0457-00
KAIG3-RFI-CO-SU-1179 00 KAIG3-RFI-CO-SU-1179-00
KAIG3-RFI-CO-SU-1177 00 KAIG3-RFI-CO-SU-1177-00
KAIG3-RFI-WG-SU-1178 00 KAIG3-RFI-WG-SU-1178-00
KAIG3-RFI-WG-SU-1176 00 KAIG3-RFI-WG-SU-1176-00
KAIG3-RFI-WG-S-2141 00 KAIG3-RFI-WG-S-2141-00
KAIG3-RFI-WG-S-2139 00 KAIG3-RFI-WG-S-2139-00
KAIG3-RFI-WG-S-2138 00 KAIG3-RFI-WG-S-2138-00
KAIG3-RFI-WG-S-2126 00 KAIG3-RFI-WG-S-2126-00
KAIG3-RFI-TG-A-0378 00 KAIG3-RFI-TG-A-0378-00
KAIG3-RFI-SW-A-0377 00 KAIG3-RFI-SW-A-0377-00
KAIG3-RFI-SW-A-0376 00 KAIG3-RFI-SW-A-0376-00
KAIG3-RFI-MB-A-0379 00 KAIG3-RFI-MB-A-0379-00
KAIG3-RFI-AG-S-2127 00 KAIG3-RFI-AG-S-2127-00
KAIG3-RFI-PA-S-2142 00 KAIG3-RFI-PA-S-2142-00
KAIG3-RFI-PA-S-1982 01 KAIG3-RFI-PA-S-1982-01
KAIG3-RFI-PA-S-2137 00 KAIG3-RFI-PA-S-2137-00
KAIG3-RFI-PA-S-2136 00 KAIG3-RFI-PA-S-2136-00
KAIG3-RFI-PA-S-2135 00 KAIG3-RFI-PA-S-2135-00
KAIG3-RFI-SW-LS-0271 00 KAIG3-RFI-SW-LS-0271-00
KAIG3-RFI-WG-SU-1175 00 KAIG3-RFI-WG-SU-1175-00
KAIG3-RFI-CO-S-2124 00 KAIG3-RFI-CO-S-2124-00
KAIG3-RFI-CO-S-2125 00 KAIG3-RFI-CO-S-2125-00
KAIG3-RFI-CO-S-2114 00 KAIG3-RFI-CO-S-2114-00
KAIG3-RFI-CO-SU-1174 00 KAIG3-RFI-CO-SU-1174-00
KAIG3-RFI-CO-S-2123 00 KAIG3-RFI-CO-S-2123-00
KAIG3-RFI-CO-S-1818 01 KAIG3-RFI-CO-S-1818-01
KAIG3-RFI-CO-S-2113 00 KAIG3-RFI-CO-S-2113-00
KAIG3-RFI-CO-S-2122 00 KAIG3-RFI-CO-S-2122-00
KAIG3-RFI-CO-S-2115 00 KAIG3-RFI-CO-S-2115-00
KAIG3-RFI-CO-S-2116 00 KAIG3-RFI-CO-S-2116-00
KAIG3-RFI-CO-S-2117 00 KAIG3-RFI-CO-S-2117-00
KAIG3-RFI-CO-S-2118 00 KAIG3-RFI-CO-S-2118-00
KAIG3-RFI-CO-S-2119 00 KAIG3-RFI-CO-S-2119-00
KAIG3-RFI-CO-S-2120 00 KAIG3-RFI-CO-S-2120-00
KAIG3-RFI-DG-LS-0258 01 KAIG3-RFI-DG-LS-0258-01
KAIG3-RFI-DG-LS-0220 02 KAIG3-RFI-DG-LS-0220-02
KAIG3-RFI-DG-A-0375 00 KAIG3-RFI-DG-A-0375-00
KAIG3-RFI-DG-A-0374 00 KAIG3-RFI-DG-A-0374-00
KAIG3-RFI-DG-A-0373 00 KAIG3-RFI-DG-A-0373-00
KAIG3-RFI-SW-LS-0268 01 KAIG3-RFI-SW-LS-0268-01
KAIG3-RFI-PA-S-2121 00 KAIG3-RFI-PA-S-2121-00
KAIG3-RFI-PA-S-2112 00 KAIG3-RFI-PA-S-2112-00
KAIG3-RFI-PA-S-2111 00 KAIG3-RFI-PA-S-2111-00
KAIG3-RFI-PA-S-2110 00 KAIG3-RFI-PA-S-2110-00
KAIG3-RFI-SW-S-2109 00 KAIG3-RFI-SW-S-2109-00
KAIG3-RFI-SW-P-0059 00 KAIG3-RFI-SW-P-0059-00
KAIG3-RFI-CO-S-2107 00 KAIG3-RFI-CO-S-2107-00
KAIG3-RFI-WG-SU-1172 00 KAIG3-RFI-WG-SU-1172-00
KAIG3-RFI-WG-S-2104 00 KAIG3-RFI-WG-S-2104-00
KAIG3-RFI-PG-SU-1173 00 KAIG3-RFI-PG-SU-1173-00
KAIG3-RFI-PG-SU-1171 00 KAIG3-RFI-PG-SU-1171-00
KAIG3-RFI-PG-S-2108 00 KAIG3-RFI-PG-S-2108-00
KAIG3-RFI-PG-S-2103 00 KAIG3-RFI-PG-S-2103-00
KAIG3-RFI-MB-S-2106 00 KAIG3-RFI-MB-S-2106-00
KAIG3-RFI-MB-S-2105 00 KAIG3-RFI-MB-S-2105-00
KAIG3-RFI-MB-A-0372 00 KAIG3-RFI-MB-A-0372-00
KAIG3-RFI-MB-A-0371 00 KAIG3-RFI-MB-A-0371-00
KAIG3-RFI-SW-LS-0270 00 KAIG3-RFI-SW-LS-0270-00
KAIG3-RFI-PA-S-2102 00 KAIG3-RFI-PA-S-2102-00
KAIG3-RFI-PA-S-2101 00 KAIG3-RFI-PA-S-2101-00
KAIG3-RFI-PA-S-2100 00 KAIG3-RFI-PA-S-2100-00
KAIG3-RFI-PA-S-2099 00 KAIG3-RFI-PA-S-2099-00
KAIG3-RFI-PA-S-2098 00 KAIG3-RFI-PA-S-2098-00
KAIG3-RFI-AG-P-0058 00 KAIG3-RFI-AG-P-0058-00
KAIG3-RFI-CO-SU-1169 00 KAIG3-RFI-CO-SU-1169-00
KAIG3-RFI-CO-S-2085 00 KAIG3-RFI-CO-S-2085-00
KAIG3-RFI-CO-S-2083 00 KAIG3-RFI-CO-S-2083-00
KAIG3-RFI-CO-S-2086 00 KAIG3-RFI-CO-S-2086-00
KAIG3-RFI-CO-S-2087 00 KAIG3-RFI-CO-S-2087-00
KAIG3-RFI-SW-LS-0206 02 KAIG3-RFI-SW-LS-0206-02
KAIG3-RFI-PA-S-2096 00 KAIG3-RFI-PA-S-2096-00
KAIG3-RFI-PA-S-2095 00 KAIG3-RFI-PA-S-2095-00
KAIG3-RFI-PA-S-2094 00 KAIG3-RFI-PA-S-2094-00
KAIG3-RFI-PA-S-2092 00 KAIG3-RFI-PA-S-2092-00
KAIG3-RFI-PA-S-2091 00 KAIG3-RFI-PA-S-2091-00
KAIG3-RFI-SW-LS-0224 02 KAIG3-RFI-SW-LS-0224-02
KAIG3-RFI-SW-S-1928 01 KAIG3-RFI-SW-S-1928-01
KAIG3-RFI-PG-S-1999 00 KAIG3-RFI-PG-S-1999-00
KAIG3-RFI-MB-S-2097 00 KAIG3-RFI-MB-S-2097-00
KAIG3-RFI-DG-S-2090 00 KAIG3-RFI-DG-S-2090-00
KAIG3-RFI-DG-S-2089 00 KAIG3-RFI-DG-S-2089-00
KAIG3-RFI-DG-S-2088 00 KAIG3-RFI-DG-S-2088-00
KAIG3-RFI-DG-S-2000 00 KAIG3-RFI-DG-S-2000-00
KAIG3-RFI-AG-SU-1170 00 KAIG3-RFI-AG-SU-1170-00
KAIG3-RFI-TT-E-0152 00 KAIG3-RFI-TT-E-0152-00
KAIG3-RFI-CO-S-2080 00 KAIG3-RFI-CO-S-2080-00
KAIG3-RFI-CO-S-2079 00 KAIG3-RFI-CO-S-2079-00
KAIG3-RFI-CO-S-2064 00 KAIG3-RFI-CO-S-2064-00
KAIG3-RFI-CO-S-2063 00 KAIG3-RFI-CO-S-2063-00
KAIG3-RFI-CO-S-1816 01 KAIG3-RFI-CO-S-1816-01
KAIG3-RFI-CO-S-1817 01 KAIG3-RFI-CO-S-1817-01
KAIG3-RFI-CO-SU-1167 00 KAIG3-RFI-CO-SU-1167-00
KAIG3-RFI-CO-GE-0456 00 KAIG3-RFI-CO-GE-0456-00
KAIG3-RFI-WG-SU-1168 00 KAIG3-RFI-WG-SU-1168-00
KAIG3-RFI-WG-SU-1166 00 KAIG3-RFI-WG-SU-1166-00
KAIG3-RFI-WG-S-2073 00 KAIG3-RFI-WG-S-2073-00
KAIG3-RFI-WG-S-2072 00 KAIG3-RFI-WG-S-2072-00
KAIG3-RFI-WG-S-2071 00 KAIG3-RFI-WG-S-2071-00
KAIG3-RFI-WG-S-2070 00 KAIG3-RFI-WG-S-2070-00
KAIG3-RFI-TG-S-2082 00 KAIG3-RFI-TG-S-2082-00
KAIG3-RFI-TG-S-2081 00 KAIG3-RFI-TG-S-2081-00
KAIG3-RFI-TG-S-2077 00 KAIG3-RFI-TG-S-2077-00
KAIG3-RFI-TG-S-2076 00 KAIG3-RFI-TG-S-2076-00
KAIG3-RFI-TG-S-2075 00 KAIG3-RFI-TG-S-2075-00
KAIG3-RFI-TG-S-2074 00 KAIG3-RFI-TG-S-2074-00
KAIG3-RFI-TB-S-2069 00 KAIG3-RFI-TB-S-2069-00
KAIG3-RFI-TB-S-2068 00 KAIG3-RFI-TB-S-2068-00
KAIG3-RFI-TB-S-2067 00 KAIG3-RFI-TB-S-2067-00
KAIG3-RFI-TB-S-2066 00 KAIG3-RFI-TB-S-2066-00
KAIG3-RFI-SW-S-2078 00 KAIG3-RFI-SW-S-2078-00
KAIG3-RFI-PA-S-2062 00 KAIG3-RFI-PA-S-2062-00
KAIG3-RFI-PA-S-2061 00 KAIG3-RFI-PA-S-2061-00
KAIG3-RFI-CO-S-2065 00 KAIG3-RFI-CO-S-2065-00
KAIG3-RFI-WG-S-2051 00 KAIG3-RFI-WG-S-2051-00
KAIG3-RFI-WG-S-2050 00 KAIG3-RFI-WG-S-2050-00
KAIG3-RFI-WG-S-2049 00 KAIG3-RFI-WG-S-2049-00
KAIG3-RFI-WG-S-2048 00 KAIG3-RFI-WG-S-2048-00
KAIG3-RFI-TG-SU-1164 00 KAIG3-RFI-TG-SU-1164-00
KAIG3-RFI-TG-S-2047 00 KAIG3-RFI-TG-S-2047-00
KAIG3-RFI-TG-S-2046 00 KAIG3-RFI-TG-S-2046-00
KAIG3-RFI-PG-SU-1165 00 KAIG3-RFI-PG-SU-1165-00
KAIG3-RFI-PG-S-2060-00 00 KAIG3-RFI-PG-S-2060-00-00
KAIG3-RFI-PG-S-2059 00 KAIG3-RFI-PG-S-2059-00
KAIG3-RFI-PG-S-2058 00 KAIG3-RFI-PG-S-2058-00
KAIG3-RFI-PG-S-2057 00 KAIG3-RFI-PG-S-2057-00
KAIG3-RFI-PG-S-2056 00 KAIG3-RFI-PG-S-2056-00
KAIG3-RFI-PG-S-2055 00 KAIG3-RFI-PG-S-2055-00
KAIG3-RFI-PG-S-2054 00 KAIG3-RFI-PG-S-2054-00
KAIG3-RFI-PG-S-2053 00 KAIG3-RFI-PG-S-2053-00
KAIG3-RFI-PG-S-2052 00 KAIG3-RFI-PG-S-2052-00
KAIG3-RFI-CO-S-1946 01 KAIG3-RFI-CO-S-1946-01
KAIG3-RFI-CO-SU-1145 01 KAIG3-RFI-CO-SU-1145-01
KAIG3-RFI-SW-S-2045 00 KAIG3-RFI-SW-S-2045-00
KAIG3-RFI-SW-LS-0269 00 KAIG3-RFI-SW-LS-0269-00
KAIG3-RFI-CO-SU-1158 00 KAIG3-RFI-CO-SU-1158-00
KAIG3-RFI-CO-S-2043 00 KAIG3-RFI-CO-S-2043-00
KAIG3-RFI-CO-S-2042 00 KAIG3-RFI-CO-S-2042-00
KAIG3-RFI-CO-S-2041 00 KAIG3-RFI-CO-S-2041-00
KAIG3-RFI-CO-S-2040 00 KAIG3-RFI-CO-S-2040-00
KAIG3-RFI-WG-SU-1163 00 KAIG3-RFI-WG-SU-1163-00
KAIG3-RFI-WG-SU-1162 00 KAIG3-RFI-WG-SU-1162-00
KAIG3-RFI-WG-S-2044 00 KAIG3-RFI-WG-S-2044-00
KAIG3-RFI-WG-S-2035 00 KAIG3-RFI-WG-S-2035-00
KAIG3-RFI-WG-S-2034 00 KAIG3-RFI-WG-S-2034-00
KAIG3-RFI-WG-S-2033 00 KAIG3-RFI-WG-S-2033-00
KAIG3-RFI-WG-S-2032 00 KAIG3-RFI-WG-S-2032-00
KAIG3-RFI-WG-S-2031 00 KAIG3-RFI-WG-S-2031-00
KAIG3-RFI-WG-S-2030 00 KAIG3-RFI-WG-S-2030-00
KAIG3-RFI-WG-S-2029 00 KAIG3-RFI-WG-S-2029-00
KAIG3-RFI-WG-S-2028 00 KAIG3-RFI-WG-S-2028-00
KAIG3-RFI-WG-S-2027 00 KAIG3-RFI-WG-S-2027-00
KAIG3-RFI-TB-S-0946 01 KAIG3-RFI-TB-S-0946-01
KAIG3-RFI-SW-A-0351 01 KAIG3-RFI-SW-A-0351-01
KAIG3-RFI-SW-LS-0268 00 KAIG3-RFI-SW-LS-0268-00
KAIG3-RFI-PA-S-2039 00 KAIG3-RFI-PA-S-2039-00
KAIG3-RFI-PA-S-2038 00 KAIG3-RFI-PA-S-2038-00
KAIG3-RFI-PA-S-2037 00 KAIG3-RFI-PA-S-2037-00
KAIG3-RFI-PA-S-2036 00 KAIG3-RFI-PA-S-2036-00
KAIG3-RFI-CO-S-2023 00 KAIG3-RFI-CO-S-2023-00
KAIG3-RFI-WG-SU-1161 00 KAIG3-RFI-WG-SU-1161-00
KAIG3-RFI-WG-SU-1159 00 KAIG3-RFI-WG-SU-1159-00
KAIG3-RFI-WG-S-2025 00 KAIG3-RFI-WG-S-2025-00
KAIG3-RFI-SW-A-0370 00 KAIG3-RFI-SW-A-0370-00
KAIG3-RFI-MB-S-2019 00 KAIG3-RFI-MB-S-2019-00
KAIG3-RFI-MB-S-2018 00 KAIG3-RFI-MB-S-2018-00
KAIG3-RFI-DG-LS-0267 00 KAIG3-RFI-DG-LS-0267-00
KAIG3-RFI-AG-S-2024 00 KAIG3-RFI-AG-S-2024-00
KAIG3-RFI-SW-S-2026 00 KAIG3-RFI-SW-S-2026-00
KAIG3-RFI-SW-SU-1160 00 KAIG3-RFI-SW-SU-1160-00
KAIG3-RFI-SW-S-2020 00 KAIG3-RFI-SW-S-2020-00
KAIG3-RFI-SW-LS-0266 00 KAIG3-RFI-SW-LS-0266-00
KAIG3-RFI-SW-LS-0213 01 KAIG3-RFI-SW-LS-0213-01
KAIG3-RFI-PA-S-2022 00 KAIG3-RFI-PA-S-2022-00
KAIG3-RFI-SW-LS-0229 01 KAIG3-RFI-SW-LS-0229-01
KAIG3-RFI-SW-S-2021 00 KAIG3-RFI-SW-S-2021-00
KAIG3-RFI-SW-P-0057 00 KAIG3-RFI-SW-P-0057-00
KAIG3-RFI-WG-E-0151 00 KAIG3-RFI-WG-E-0151-00
KAIG3-RFI-SW-LS-0265 00 KAIG3-RFI-SW-LS-0265-00
KAIG3-RFI-SW-LS-0264 00 KAIG3-RFI-SW-LS-0264-00
KAIG3-RFI-SW-LS-0263 00 KAIG3-RFI-SW-LS-0263-00
KAIG3-RFI-WG-SU-1061 01 KAIG3-RFI-WG-SU-1061-01
KAIG3-RFI-WG-S-2017 00 KAIG3-RFI-WG-S-2017-00
KAIG3-RFI-WG-S-2016 00 KAIG3-RFI-WG-S-2016-00
KAIG3-RFI-WG-S-2015 00 KAIG3-RFI-WG-S-2015-00
KAIG3-RFI-WG-S-2014 00 KAIG3-RFI-WG-S-2014-00
KAIG3-RFI-WG-S-2013 00 KAIG3-RFI-WG-S-2013-00
KAIG3-RFI-WG-S-2012 00 KAIG3-RFI-WG-S-2012-00
KAIG3-RFI-WG-S-2011 00 KAIG3-RFI-WG-S-2011-00
KAIG3-RFI-WG-S-2010 00 KAIG3-RFI-WG-S-2010-00
KAIG3-RFI-SW-A-0336 02 KAIG3-RFI-SW-A-0336-02
KAIG3-RFI-SW-A-0333 01 KAIG3-RFI-SW-A-0333-01
KAIG3-RFI-SW-A-0296 02 KAIG3-RFI-SW-A-0296-02
KAIG3-RFI-PG-S-2009 00 KAIG3-RFI-PG-S-2009-00
KAIG3-RFI-PG-S-2008 00 KAIG3-RFI-PG-S-2008-00
KAIG3-RFI-PG-S-2007 00 KAIG3-RFI-PG-S-2007-00
KAIG3-RFI-PG-S-2006 00 KAIG3-RFI-PG-S-2006-00
KAIG3-RFI-PG-S-2005 00 KAIG3-RFI-PG-S-2005-00
KAIG3-RFI-PG-S-2004 00 KAIG3-RFI-PG-S-2004-00
KAIG3-RFI-PG-S-2003 00 KAIG3-RFI-PG-S-2003-00
KAIG3-RFI-AG-SU-1157 00 KAIG3-RFI-AG-SU-1157-00
KAIG3-RFI-SW-LS-0262 00 KAIG3-RFI-SW-LS-0262-00
KAIG3-RFI-SW-LS-0261 00 KAIG3-RFI-SW-LS-0261-00
KAIG3-RFI-PA-S-2002 00 KAIG3-RFI-PA-S-2002-00
KAIG3-RFI-SW-SU-0987 01 KAIG3-RFI-SW-SU-0987-01
KAIG3-RFI-SW-S-2001 00 KAIG3-RFI-SW-S-2001-00
KAIG3-RFI-SW-S-1998 00 KAIG3-RFI-SW-S-1998-00
KAIG3-RFI-SW-S-1997 00 KAIG3-RFI-SW-S-1997-00
KAIG3-RFI-SW-LS-0259 00 KAIG3-RFI-SW-LS-0259-00
KAIG3-RFI-SW-LS-0260 00 KAIG3-RFI-SW-LS-0260-00
KAIG3-RFI-WG-SU-1156 00 KAIG3-RFI-WG-SU-1156-00
KAIG3-RFI-AG-S-1845 01 KAIG3-RFI-AG-S-1845-01
KAIG3-RFI-SW-A-0367 01 KAIG3-RFI-SW-A-0367-01
KAIG3-RFI-SW-A-0366 01 KAIG3-RFI-SW-A-0366-01
KAIG3-RFI-PA-S-1979 00 KAIG3-RFI-PA-S-1979-00
KAIG3-RFI-PA-S-1978 00 KAIG3-RFI-PA-S-1978-00
KAIG3-RFI-MB-SU-1154 00 KAIG3-RFI-MB-SU-1154-00
KAIG3-RFI-MB-S-1996 00 KAIG3-RFI-MB-S-1996-00
KAIG3-RFI-MB-S-1995 00 KAIG3-RFI-MB-S-1995-00
KAIG3-RFI-MB-S-1994 00 KAIG3-RFI-MB-S-1994-00
KAIG3-RFI-SM-LC-0132 00 KAIG3-RFI-SM-LC-0132-00
KAIG3-RFI-MB-S-1993 00 KAIG3-RFI-MB-S-1993-00
KAIG3-RFI-SM-LC-0131 00 KAIG3-RFI-SM-LC-0131-00
KAIG3-RFI-SM-LC-0130 00 KAIG3-RFI-SM-LC-0130-00
KAIG3-RFI-MB-S-1992 00 KAIG3-RFI-MB-S-1992-00
KAIG3-RFI-MB-A-0369 00 KAIG3-RFI-MB-A-0369-00
KAIG3-RFI-DG-LS-0258 00 KAIG3-RFI-DG-LS-0258-00
KAIG3-RFI-SW-S-1990 00 KAIG3-RFI-SW-S-1990-00
KAIG3-RFI-SW-S-1984 00 KAIG3-RFI-SW-S-1984-00
KAIG3-RFI-SM-E-0150 00 KAIG3-RFI-SM-E-0150-00
KAIG3-RFI-SM-E-0149 00 KAIG3-RFI-SM-E-0149-00
KAIG3-RFI-SW-LS-0256 00 KAIG3-RFI-SW-LS-0256-00
KAIG3-RFI-SW-LS-0255 00 KAIG3-RFI-SW-LS-0255-00
KAIG3-RFI-SW-LS-0254 00 KAIG3-RFI-SW-LS-0254-00
KAIG3-RFI-SW-LS-0206 01 KAIG3-RFI-SW-LS-0206-01
KAIG3-RFI-PA-S-1991 00 KAIG3-RFI-PA-S-1991-00
KAIG3-RFI-PA-S-1988 00 KAIG3-RFI-PA-S-1988-00
KAIG3-RFI-PA-S-1983 00 KAIG3-RFI-PA-S-1983-00
KAIG3-RFI-PA-S-1982 00 KAIG3-RFI-PA-S-1982-00
KAIG3-RFI-PA-S-1981 00 KAIG3-RFI-PA-S-1981-00
KAIG3-RFI-PA-S-1980 00 KAIG3-RFI-PA-S-1980-00
KAIG3-RFI-SW-LS-0224 01 KAIG3-RFI-SW-LS-0224-01
KAIG3-RFI-CO-S-1987 00 KAIG3-RFI-CO-S-1987-00
KAIG3-RFI-CO-S-1986 00 KAIG3-RFI-CO-S-1986-00
KAIG3-RFI-CO-S-1985 00 KAIG3-RFI-CO-S-1985-00
KAIG3-RFI-CO-S-1545 01 KAIG3-RFI-CO-S-1545-01
KAIG3-RFI-CO-S-1544 01 KAIG3-RFI-CO-S-1544-01
KAIG3-RFI-CO-GE-0455 00 KAIG3-RFI-CO-GE-0455-00
KAIG3-RFI-CO-SU-1153 00 KAIG3-RFI-CO-SU-1153-00
KAIG3-RFI-SW-P-0056 00 KAIG3-RFI-SW-P-0056-00
KAIG3-RFI-AG-P-0055 00 KAIG3-RFI-AG-P-0055-00
KAIG3-RFI-SW-S-1977 00 KAIG3-RFI-SW-S-1977-00
KAIG3-RFI-SW-S-1563 01 KAIG3-RFI-SW-S-1563-01
KAIG3-RFI-CO-GE-0453 00 KAIG3-RFI-CO-GE-0453-00
KAIG3-RFI-SW-S-1562 01 KAIG3-RFI-SW-S-1562-01
KAIG3-RFI-CO-GE-0454 00 KAIG3-RFI-CO-GE-0454-00
KAIG3-RFI-SW-S-1560 01 KAIG3-RFI-SW-S-1560-01
KAIG3-RFI-PG-SU-1152 00 KAIG3-RFI-PG-SU-1152-00
KAIG3-RFI-DG-SU-1139 01 KAIG3-RFI-DG-SU-1139-01
KAIG3-RFI-DG-LS-0220 01 KAIG3-RFI-DG-LS-0220-01
KAIG3-RFI-PA-S-1976 00 KAIG3-RFI-PA-S-1976-00
KAIG3-RFI-PA-S-1975 00 KAIG3-RFI-PA-S-1975-00
KAIG3-RFI-PA-S-1974 00 KAIG3-RFI-PA-S-1974-00
KAIG3-RFI-PA-S-1973 00 KAIG3-RFI-PA-S-1973-00
KAIG3-RFI-SW-LS-0241 00 KAIG3-RFI-SW-LS-0241-00
KAIG3-RFI-WG-S-1972 00 KAIG3-RFI-WG-S-1972-00
KAIG3-RFI-CO-SU-1149 00 KAIG3-RFI-CO-SU-1149-00
KAIG3-RFI-CO-S-1971 00 KAIG3-RFI-CO-S-1971-00
KAIG3-RFI-CO-S-1970 00 KAIG3-RFI-CO-S-1970-00
KAIG3-RFI-CO-S-1969 00 KAIG3-RFI-CO-S-1969-00
KAIG3-RFI-CO-SU-1151 00 KAIG3-RFI-CO-SU-1151-00
KAIG3-RFI-SW-S-1968 00 KAIG3-RFI-SW-S-1968-00
KAIG3-RFI-PG-SU-1150 00 KAIG3-RFI-PG-SU-1150-00
KAIG3-RFI-SW-S-1967 00 KAIG3-RFI-SW-S-1967-00
KAIG3-RFI-SW-LS-0232 00 KAIG3-RFI-SW-LS-0232-00
KAIG3-RFI-PA-S-1966 00 KAIG3-RFI-PA-S-1966-00
KAIG3-RFI-PA-S-1965 00 KAIG3-RFI-PA-S-1965-00
KAIG3-RFI-PA-S-1964 00 KAIG3-RFI-PA-S-1964-00
KAIG3-RFI-CO-SU-1148 00 KAIG3-RFI-CO-SU-1148-00
KAIG3-RFI-CO-S-1963 00 KAIG3-RFI-CO-S-1963-00
KAIG3-RFI-SW-P-0052 01 KAIG3-RFI-SW-P-0052-01
KAIG3-RFI-WG-S-1960 00 KAIG3-RFI-WG-S-1960-00
KAIG3-RFI-WG-LS-0231 00 KAIG3-RFI-WG-LS-0231-00
KAIG3-RFI-TB-SU-1147 00 KAIG3-RFI-TB-SU-1147-00
KAIG3-RFI-TB-S-1958 00 KAIG3-RFI-TB-S-1958-00
KAIG3-RFI-TB-S-1957 00 KAIG3-RFI-TB-S-1957-00
KAIG3-RFI-TB-S-1956 00 KAIG3-RFI-TB-S-1956-00
KAIG3-RFI-SW-A-0368 00 KAIG3-RFI-SW-A-0368-00
KAIG3-RFI-PG-S-1934 00 KAIG3-RFI-PG-S-1934-00
KAIG3-RFI-PG-S-1916 01 KAIG3-RFI-PG-S-1916-01
KAIG3-RFI-PA-S-1962 00 KAIG3-RFI-PA-S-1962-00
KAIG3-RFI-SW-S-1961 00 KAIG3-RFI-SW-S-1961-00
KAIG3-RFI-PA-S-1955 00 KAIG3-RFI-PA-S-1955-00
KAIG3-RFI-SW-S-1954 00 KAIG3-RFI-SW-S-1954-00
KAIG3-RFI-SW-S-1953 00 KAIG3-RFI-SW-S-1953-00
KAIG3-RFI-SW-S-1952 00 KAIG3-RFI-SW-S-1952-00
KAIG3-RFI-PA-S-1951 00 KAIG3-RFI-PA-S-1951-00
KAIG3-RFI-CO-SU-1145 00 KAIG3-RFI-CO-SU-1145-00
KAIG3-RFI-CO-S-1943 00 KAIG3-RFI-CO-S-1943-00
KAIG3-RFI-CO-S-1944 00 KAIG3-RFI-CO-S-1944-00
KAIG3-RFI-CO-S-1945 00 KAIG3-RFI-CO-S-1945-00
KAIG3-RFI-CO-S-1946 00 KAIG3-RFI-CO-S-1946-00
KAIG3-RFI-WG-SU-1140 00 KAIG3-RFI-WG-SU-1140-00
KAIG3-RFI-WG-LS-0239 00 KAIG3-RFI-WG-LS-0239-00
KAIG3-RFI-SW-A-0367 00 KAIG3-RFI-SW-A-0367-00
KAIG3-RFI-SW-A-0366 00 KAIG3-RFI-SW-A-0366-00
KAIG3-RFI-CO-SU-1118 01 KAIG3-RFI-CO-SU-1118-01
KAIG3-RFI-SW-A-0336 01 KAIG3-RFI-SW-A-0336-01
KAIG3-RFI-MB-S-1947 00 KAIG3-RFI-MB-S-1947-00
KAIG3-RFI-MB-S-1941 00 KAIG3-RFI-MB-S-1941-00
KAIG3-RFI-AG-SU-1146 00 KAIG3-RFI-AG-SU-1146-00
KAIG3-RFI-CO-SU-1144 00 KAIG3-RFI-CO-SU-1144-00
KAIG3-RFI-AG-SU-1107 01 KAIG3-RFI-AG-SU-1107-01
KAIG3-RFI-SW-S-1811 01 KAIG3-RFI-SW-S-1811-01
KAIG3-RFI-SW-LS-0205 01 KAIG3-RFI-SW-LS-0205-01
KAIG3-RFI-PA-S-1949 00 KAIG3-RFI-PA-S-1949-00
KAIG3-RFI-PA-S-1948 00 KAIG3-RFI-PA-S-1948-00
KAIG3-RFI-SW-S-1950 00 KAIG3-RFI-SW-S-1950-00
KAIG3-RFI-SW-LS-0230 00 KAIG3-RFI-SW-LS-0230-00
KAIG3-RFI-SW-LS-0210 01 KAIG3-RFI-SW-LS-0210-01
KAIG3-RFI-CO-SU-1100 01 KAIG3-RFI-CO-SU-1100-01
KAIG3-RFI-MB-A-0365 00 KAIG3-RFI-MB-A-0365-00
KAIG3-RFI-MB-A-0364 00 KAIG3-RFI-MB-A-0364-00
KAIG3-RFI-MB-A-0363 00 KAIG3-RFI-MB-A-0363-00
KAIG3-RFI-MB-A-0362 00 KAIG3-RFI-MB-A-0362-00
KAIG3-RFI-SW-A-0360 01 KAIG3-RFI-SW-A-0360-01
KAIG3-RFI-SW-A-0359 01 KAIG3-RFI-SW-A-0359-01
KAIG3-RFI-SW-A-0358 01 KAIG3-RFI-SW-A-0358-01
KAIG3-RFI-MB-S-1885 00 KAIG3-RFI-MB-S-1885-00
KAIG3-RFI-MB-S-1878 00 KAIG3-RFI-MB-S-1878-00
KAIG3-RFI-SW-LS-0208 01 KAIG3-RFI-SW-LS-0208-01
KAIG3-RFI-SW-LS-0228 00 KAIG3-RFI-SW-LS-0228-00
KAIG3-RFI-PA-S-1942 00 KAIG3-RFI-PA-S-1942-00
KAIG3-RFI-PA-S-1940 00 KAIG3-RFI-PA-S-1940-00
KAIG3-RFI-PA-S-1939 00 KAIG3-RFI-PA-S-1939-00
KAIG3-RFI-PA-S-1908 01 KAIG3-RFI-PA-S-1908-01
KAIG3-RFI-PA-S-1849 01 KAIG3-RFI-PA-S-1849-01
KAIG3-RFI-SW-LS-0229 00 KAIG3-RFI-SW-LS-0229-00
KAIG3-RFI-SW-LS-0223 00 KAIG3-RFI-SW-LS-0223-00
KAIG3-RFI-SW-SU-1143 00 KAIG3-RFI-SW-SU-1143-00
KAIG3-RFI-TG-LC-0129 00 KAIG3-RFI-TG-LC-0129-00
KAIG3-RFI-TG-LC-0128 00 KAIG3-RFI-TG-LC-0128-00
KAIG3-RFI-SW-LS-0209 01 KAIG3-RFI-SW-LS-0209-01
KAIG3-RFI-SW-LS-0238 00 KAIG3-RFI-SW-LS-0238-00
KAIG3-RFI-SW-LS-0237 00 KAIG3-RFI-SW-LS-0237-00
KAIG3-RFI-SW-LS-0202 01 KAIG3-RFI-SW-LS-0202-01
KAIG3-RFI-PA-S-1932 00 KAIG3-RFI-PA-S-1932-00
KAIG3-RFI-PA-S-1929 00 KAIG3-RFI-PA-S-1929-00
KAIG3-RFI-SW-S-1936 00 KAIG3-RFI-SW-S-1936-00
KAIG3-RFI-PG-S-1935 00 KAIG3-RFI-PG-S-1935-00
KAIG3-RFI-PG-S-1933 00 KAIG3-RFI-PG-S-1933-00
KAIG3-RFI-AG-SU-1142 00 KAIG3-RFI-AG-SU-1142-00
KAIG3-RFI-SW-LS-0236 00 KAIG3-RFI-SW-LS-0236-00
KAIG3-RFI-SW-LS-0235 00 KAIG3-RFI-SW-LS-0235-00
KAIG3-RFI-PA-S-1931 00 KAIG3-RFI-PA-S-1931-00
KAIG3-RFI-PA-S-1930 00 KAIG3-RFI-PA-S-1930-00
KAIG3-RFI-CO-S-1938 00 KAIG3-RFI-CO-S-1938-00
KAIG3-RFI-CO-S-1937 00 KAIG3-RFI-CO-S-1937-00
KAIG3-RFI-PA-S-1923 00 KAIG3-RFI-PA-S-1923-00
KAIG3-RFI-TB-LC-0123 01 KAIG3-RFI-TB-LC-0123-01
KAIG3-RFI-SM-P-0054 00 KAIG3-RFI-SM-P-0054-00
KAIG3-RFI-SM-P-0053 00 KAIG3-RFI-SM-P-0053-00
KAIG3-RFI-PG-E-0148 00 KAIG3-RFI-PG-E-0148-00
KAIG3-RFI-PG-LC-0127 00 KAIG3-RFI-PG-LC-0127-00
KAIG3-RFI-PG-LC-0126 00 KAIG3-RFI-PG-LC-0126-00
KAIG3-RFI-PG-SU-1141 00 KAIG3-RFI-PG-SU-1141-00
KAIG3-RFI-DG-SU-1139 00 KAIG3-RFI-DG-SU-1139-00
KAIG3-RFI-WG-SU-1138 00 KAIG3-RFI-WG-SU-1138-00
KAIG3-RFI-PG-SU-1137 00 KAIG3-RFI-PG-SU-1137-00
KAIG3-RFI-PG-SU-1136 00 KAIG3-RFI-PG-SU-1136-00
KAIG3-RFI-SW-LS-0234 00 KAIG3-RFI-SW-LS-0234-00
KAIG3-RFI-PA-S-1927 00 KAIG3-RFI-PA-S-1927-00
KAIG3-RFI-PA-S-1926 00 KAIG3-RFI-PA-S-1926-00
KAIG3-RFI-SM-E-0146 00 KAIG3-RFI-SM-E-0146-00
KAIG3-RFI-SW-SU-1135 00 KAIG3-RFI-SW-SU-1135-00
KAIG3-RFI-SM-E-0145 00 KAIG3-RFI-SM-E-0145-00
KAIG3-RFI-SW-S-1928 00 KAIG3-RFI-SW-S-1928-00
KAIG3-RFI-SM-E-0144 00 KAIG3-RFI-SM-E-0144-00
KAIG3-RFI-SM-LC-0125 00 KAIG3-RFI-SM-LC-0125-00
KAIG3-RFI-WG-LS-0233 00 KAIG3-RFI-WG-LS-0233-00
KAIG3-RFI-PG-SU-1133 00 KAIG3-RFI-PG-SU-1133-00
KAIG3-RFI-PG-S-1922 00 KAIG3-RFI-PG-S-1922-00
KAIG3-RFI-MB-SU-1134 00 KAIG3-RFI-MB-SU-1134-00
KAIG3-RFI-SW-A-0340 00 KAIG3-RFI-SW-A-0340-00
KAIG3-RFI-SW-A-0339 00 KAIG3-RFI-SW-A-0339-00
KAIG3-RFI-WG-LS-0227 00 KAIG3-RFI-WG-LS-0227-00
KAIG3-RFI-WG-LS-0226 00 KAIG3-RFI-WG-LS-0226-00
KAIG3-RFI-SG-SU-1120 01 KAIG3-RFI-SG-SU-1120-01
KAIG3-RFI-SG-SU-1119 01 KAIG3-RFI-SG-SU-1119-01
KAIG3-RFI-PA-S-1925 00 KAIG3-RFI-PA-S-1925-00
KAIG3-RFI-PA-S-1924 00 KAIG3-RFI-PA-S-1924-00
KAIG3-RFI-SW-LS-0225 00 KAIG3-RFI-SW-LS-0225-00
KAIG3-RFI-SW-LS-0224 00 KAIG3-RFI-SW-LS-0224-00
KAIG3-RFI-SW-P-0052 00 KAIG3-RFI-SW-P-0052-00
KAIG3-RFI-CO-SU-1132 00 KAIG3-RFI-CO-SU-1132-00
KAIG3-RFI-CO-S-1658 01 KAIG3-RFI-CO-S-1658-01
KAIG3-RFI-CO-S-1657 01 KAIG3-RFI-CO-S-1657-01
KAIG3-RFI-CO-S-1716 01 KAIG3-RFI-CO-S-1716-01
KAIG3-RFI-CO-S-1921 00 KAIG3-RFI-CO-S-1921-00
KAIG3-RFI-CO-S-1920 00 KAIG3-RFI-CO-S-1920-00
KAIG3-RFI-CO-S-1919 00 KAIG3-RFI-CO-S-1919-00
KAIG3-RFI-CO-S-1644 01 KAIG3-RFI-CO-S-1644-01
KAIG3-RFI-CO-S-1643 01 KAIG3-RFI-CO-S-1643-01
KAIG3-RFI-CO-S-1642 01 KAIG3-RFI-CO-S-1642-01
KAIG3-RFI-CO-S-1641 01 KAIG3-RFI-CO-S-1641-01
KAIG3-RFI-SW-LS-0222 00 KAIG3-RFI-SW-LS-0222-00
KAIG3-RFI-SW-LS-0221 00 KAIG3-RFI-SW-LS-0221-00
KAIG3-RFI-WG-LS-0203 01 KAIG3-RFI-WG-LS-0203-01
KAIG3-RFI-SW-P-0050 01 KAIG3-RFI-SW-P-0050-01
KAIG3-RFI-WG-SU-1130 00 KAIG3-RFI-WG-SU-1130-00
KAIG3-RFI-TG-S-1918 00 KAIG3-RFI-TG-S-1918-00
KAIG3-RFI-PG-SU-1128 00 KAIG3-RFI-PG-SU-1128-00
KAIG3-RFI-PG-S-1916 00 KAIG3-RFI-PG-S-1916-00
KAIG3-RFI-PA-SU-1129 00 KAIG3-RFI-PA-SU-1129-00
KAIG3-RFI-PA-S-1917 00 KAIG3-RFI-PA-S-1917-00
KAIG3-RFI-DG-LS-0220 00 KAIG3-RFI-DG-LS-0220-00
KAIG3-RFI-PA-S-1915 00 KAIG3-RFI-PA-S-1915-00
KAIG3-RFI-PA-S-1914 00 KAIG3-RFI-PA-S-1914-00
KAIG3-RFI-PA-S-1913 00 KAIG3-RFI-PA-S-1913-00
KAIG3-RFI-PA-S-1912 00 KAIG3-RFI-PA-S-1912-00
KAIG3-RFI-PA-S-1911 00 KAIG3-RFI-PA-S-1911-00
KAIG3-RFI-SW-LS-0219 00 KAIG3-RFI-SW-LS-0219-00
KAIG3-RFI-SW-SU-1131 00 KAIG3-RFI-SW-SU-1131-00
KAIG3-RFI-TT-S-0654 02 KAIG3-RFI-TT-S-0654-02
KAIG3-RFI-PG-E-0143 00 KAIG3-RFI-PG-E-0143-00
KAIG3-RFI-CO-S-1910 00 KAIG3-RFI-CO-S-1910-00
KAIG3-RFI-CO-S-1909 00 KAIG3-RFI-CO-S-1909-00
KAIG3-RFI-CO-SU-1124 00 KAIG3-RFI-CO-SU-1124-00
KAIG3-RFI-CO-S-1895 00 KAIG3-RFI-CO-S-1895-00
KAIG3-RFI-CO-S-1894 00 KAIG3-RFI-CO-S-1894-00
KAIG3-RFI-CO-S-1893 00 KAIG3-RFI-CO-S-1893-00
KAIG3-RFI-CO-S-1892 00 KAIG3-RFI-CO-S-1892-00
KAIG3-RFI-CO-S-1891 00 KAIG3-RFI-CO-S-1891-00
KAIG3-RFI-CO-S-1890 00 KAIG3-RFI-CO-S-1890-00
KAIG3-RFI-CO-S-1889 00 KAIG3-RFI-CO-S-1889-00
KAIG3-RFI-CO-S-1888 00 KAIG3-RFI-CO-S-1888-00
KAIG3-RFI-CO-S-1887 00 KAIG3-RFI-CO-S-1887-00
KAIG3-RFI-CO-S-1896 00 KAIG3-RFI-CO-S-1896-00
KAIG3-RFI-CO-S-1743 01 KAIG3-RFI-CO-S-1743-01
KAIG3-RFI-CO-S-1742 01 KAIG3-RFI-CO-S-1742-01
KAIG3-RFI-CO-S-1796 01 KAIG3-RFI-CO-S-1796-01
KAIG3-RFI-CO-S-1795 01 KAIG3-RFI-CO-S-1795-01
KAIG3-RFI-CO-S-1794 01 KAIG3-RFI-CO-S-1794-01
KAIG3-RFI-CO-S-1793 01 KAIG3-RFI-CO-S-1793-01
KAIG3-RFI-WG-LS-0218 00 KAIG3-RFI-WG-LS-0218-00
KAIG3-RFI-SW-S-1907 00 KAIG3-RFI-SW-S-1907-00
KAIG3-RFI-SW-S-1906 00 KAIG3-RFI-SW-S-1906-00
KAIG3-RFI-SW-S-1905 00 KAIG3-RFI-SW-S-1905-00
KAIG3-RFI-SW-S-1904 00 KAIG3-RFI-SW-S-1904-00
KAIG3-RFI-SW-S-1903 00 KAIG3-RFI-SW-S-1903-00
KAIG3-RFI-SW-S-1814 00 KAIG3-RFI-SW-S-1814-00
KAIG3-RFI-SW-A-0360 00 KAIG3-RFI-SW-A-0360-00
KAIG3-RFI-SW-A-0359 00 KAIG3-RFI-SW-A-0359-00
KAIG3-RFI-SW-A-0358 00 KAIG3-RFI-SW-A-0358-00
KAIG3-RFI-SW-A-0357 00 KAIG3-RFI-SW-A-0357-00
KAIG3-RFI-SW-A-0356 00 KAIG3-RFI-SW-A-0356-00
KAIG3-RFI-SW-A-0355 00 KAIG3-RFI-SW-A-0355-00
KAIG3-RFI-SW-A-0354 00 KAIG3-RFI-SW-A-0354-00
KAIG3-RFI-SG-SU-1126 00 KAIG3-RFI-SG-SU-1126-00
KAIG3-RFI-SW-SU-1125 00 KAIG3-RFI-SW-SU-1125-00
KAIG3-RFI-SW-SU-1127 00 KAIG3-RFI-SW-SU-1127-00
KAIG3-RFI-PA-S-1908 00 KAIG3-RFI-PA-S-1908-00
KAIG3-RFI-PA-S-1901 00 KAIG3-RFI-PA-S-1901-00
KAIG3-RFI-PA-S-1900 00 KAIG3-RFI-PA-S-1900-00
KAIG3-RFI-SW-LS-0217 00 KAIG3-RFI-SW-LS-0217-00
KAIG3-RFI-WG-LS-0215 00 KAIG3-RFI-WG-LS-0215-00
KAIG3-RFI-TB-SU-1122 00 KAIG3-RFI-TB-SU-1122-00
KAIG3-RFI-TB-S-1884 00 KAIG3-RFI-TB-S-1884-00
KAIG3-RFI-TB-S-1883 00 KAIG3-RFI-TB-S-1883-00
KAIG3-RFI-TB-S-1880 00 KAIG3-RFI-TB-S-1880-00
KAIG3-RFI-TB-S-1879 00 KAIG3-RFI-TB-S-1879-00
KAIG3-RFI-SW-S-1886 00 KAIG3-RFI-SW-S-1886-00
KAIG3-RFI-SW-A-0352 00 KAIG3-RFI-SW-A-0352-00
KAIG3-RFI-SW-A-0351 00 KAIG3-RFI-SW-A-0351-00
KAIG3-RFI-SG-SU-1123 00 KAIG3-RFI-SG-SU-1123-00
KAIG3-RFI-SG-SU-1120 00 KAIG3-RFI-SG-SU-1120-00
KAIG3-RFI-SG-SU-1119 00 KAIG3-RFI-SG-SU-1119-00
KAIG3-RFI-PA-S-1882 00 KAIG3-RFI-PA-S-1882-00
KAIG3-RFI-PA-S-1881 00 KAIG3-RFI-PA-S-1881-00
KAIG3-RFI-SW-S-1899 00 KAIG3-RFI-SW-S-1899-00
KAIG3-RFI-SW-LS-0216 00 KAIG3-RFI-SW-LS-0216-00
KAIG3-RFI-PA-S-1898 00 KAIG3-RFI-PA-S-1898-00
KAIG3-RFI-PA-S-1897 00 KAIG3-RFI-PA-S-1897-00
KAIG3-RFI-PA-S-1877 00 KAIG3-RFI-PA-S-1877-00
KAIG3-RFI-SW-LS-0214 00 KAIG3-RFI-SW-LS-0214-00
KAIG3-RFI-SW-LS-0213 00 KAIG3-RFI-SW-LS-0213-00
KAIG3-RFI-SW-LS-0212 00 KAIG3-RFI-SW-LS-0212-00
KAIG3-RFI-CO-S-1869 00 KAIG3-RFI-CO-S-1869-00
KAIG3-RFI-CO-S-1868 00 KAIG3-RFI-CO-S-1868-00
KAIG3-RFI-CO-S-1867 00 KAIG3-RFI-CO-S-1867-00
KAIG3-RFI-CO-S-1866 00 KAIG3-RFI-CO-S-1866-00
KAIG3-RFI-CO-S-1865 00 KAIG3-RFI-CO-S-1865-00
KAIG3-RFI-CO-S-1857 00 KAIG3-RFI-CO-S-1857-00
KAIG3-RFI-CO-S-1856 00 KAIG3-RFI-CO-S-1856-00
KAIG3-RFI-CO-S-1714 01 KAIG3-RFI-CO-S-1714-01
KAIG3-RFI-CO-S-1713 01 KAIG3-RFI-CO-S-1713-01
KAIG3-RFI-CO-SU-1118 00 KAIG3-RFI-CO-SU-1118-00
KAIG3-RFI-SW-S-1859 00 KAIG3-RFI-SW-S-1859-00
KAIG3-RFI-SW-S-1858 00 KAIG3-RFI-SW-S-1858-00
KAIG3-RFI-MB-S-1851 00 KAIG3-RFI-MB-S-1851-00
KAIG3-RFI-SW-LS-0211 00 KAIG3-RFI-SW-LS-0211-00
KAIG3-RFI-PA-S-1853 00 KAIG3-RFI-PA-S-1853-00
KAIG3-RFI-PA-S-1852 00 KAIG3-RFI-PA-S-1852-00
KAIG3-RFI-PA-S-1850 00 KAIG3-RFI-PA-S-1850-00
KAIG3-RFI-PA-S-1849 00 KAIG3-RFI-PA-S-1849-00
KAIG3-RFI-TB-LC-0124 00 KAIG3-RFI-TB-LC-0124-00
KAIG3-RFI-TB-LC-0123 00 KAIG3-RFI-TB-LC-0123-00
KAIG3-RFI-TB-LC-0122 00 KAIG3-RFI-TB-LC-0122-00
KAIG3-RFI-TB-E-0142 00 KAIG3-RFI-TB-E-0142-00
KAIG3-RFI-TB-E-0141 00 KAIG3-RFI-TB-E-0141-00
KAIG3-RFI-ZG-A-0350 00 KAIG3-RFI-ZG-A-0350-00
KAIG3-RFI-PA-SU-1117 00 KAIG3-RFI-PA-SU-1117-00
KAIG3-RFI-MB-S-1844 00 KAIG3-RFI-MB-S-1844-00
KAIG3-RFI-AG-S-1845 00 KAIG3-RFI-AG-S-1845-00
KAIG3-RFI-CO-S-1846 00 KAIG3-RFI-CO-S-1846-00
KAIG3-RFI-CO-S-1847 00 KAIG3-RFI-CO-S-1847-00
KAIG3-RFI-CO-S-1848 00 KAIG3-RFI-CO-S-1848-00
KAIG3-RFI-CO-SU-1115 00 KAIG3-RFI-CO-SU-1115-00
KAIG3-RFI-SW-LS-0210 00 KAIG3-RFI-SW-LS-0210-00
KAIG3-RFI-SW-LS-0209 00 KAIG3-RFI-SW-LS-0209-00
KAIG3-RFI-SW-S-1482 02 KAIG3-RFI-SW-S-1482-02
KAIG3-RFI-CO-S-1840 00 KAIG3-RFI-CO-S-1840-00
KAIG3-RFI-CO-S-1841 00 KAIG3-RFI-CO-S-1841-00
KAIG3-RFI-CO-S-1712 01 KAIG3-RFI-CO-S-1712-01
KAIG3-RFI-CO-S-1711 01 KAIG3-RFI-CO-S-1711-01
KAIG3-RFI-SW-S-1843 00 KAIG3-RFI-SW-S-1843-00
KAIG3-RFI-SW-S-1842 00 KAIG3-RFI-SW-S-1842-00
KAIG3-RFI-PA-S-1839 00 KAIG3-RFI-PA-S-1839-00
KAIG3-RFI-PA-S-1838 00 KAIG3-RFI-PA-S-1838-00
KAIG3-RFI-CO-S-1836 00 KAIG3-RFI-CO-S-1836-00
KAIG3-RFI-CO-S-1835 00 KAIG3-RFI-CO-S-1835-00
KAIG3-RFI-CO-SU-1116 00 KAIG3-RFI-CO-SU-1116-00
KAIG3-RFI-CO-S-1817 00 KAIG3-RFI-CO-S-1817-00
KAIG3-RFI-CO-S-1818 00 KAIG3-RFI-CO-S-1818-00
KAIG3-RFI-CO-S-1816 00 KAIG3-RFI-CO-S-1816-00
KAIG3-RFI-CO-S-1815 00 KAIG3-RFI-CO-S-1815-00
KAIG3-RFI-SW-P-0044 00 KAIG3-RFI-SW-P-0044-00
KAIG3-RFI-SW-LS-0208 00 KAIG3-RFI-SW-LS-0208-00
KAIG3-RFI-SW-LS-0207 00 KAIG3-RFI-SW-LS-0207-00
KAIG3-RFI-SW-LS-0206 00 KAIG3-RFI-SW-LS-0206-00
KAIG3-RFI-SW-LS-0205 00 KAIG3-RFI-SW-LS-0205-00
KAIG3-RFI-SW-S-1824 00 KAIG3-RFI-SW-S-1824-00
KAIG3-RFI-PA-S-1828 00 KAIG3-RFI-PA-S-1828-00
KAIG3-RFI-PA-S-1827 00 KAIG3-RFI-PA-S-1827-00
KAIG3-RFI-PA-S-1826 00 KAIG3-RFI-PA-S-1826-00
KAIG3-RFI-SW-S-1837 00 KAIG3-RFI-SW-S-1837-00
KAIG3-RFI-TB-SU-1094 01 KAIG3-RFI-TB-SU-1094-01
KAIG3-RFI-PA-S-1825 00 KAIG3-RFI-PA-S-1825-00
KAIG3-RFI-SW-S-1830 00 KAIG3-RFI-SW-S-1830-00
KAIG3-RFI-SW-S-1829 00 KAIG3-RFI-SW-S-1829-00
KAIG3-RFI-ZG-S-1832 00 KAIG3-RFI-ZG-S-1832-00
KAIG3-RFI-ZG-S-1831 00 KAIG3-RFI-ZG-S-1831-00
KAIG3-RFI-TB-SU-1113 00 KAIG3-RFI-TB-SU-1113-00
KAIG3-RFI-TB-S-1833 00 KAIG3-RFI-TB-S-1833-00
KAIG3-RFI-SW-S-1823 00 KAIG3-RFI-SW-S-1823-00
KAIG3-RFI-SW-S-1822 00 KAIG3-RFI-SW-S-1822-00
KAIG3-RFI-SW-S-1821 00 KAIG3-RFI-SW-S-1821-00
KAIG3-RFI-SW-A-0349 00 KAIG3-RFI-SW-A-0349-00
KAIG3-RFI-SW-A-0348 00 KAIG3-RFI-SW-A-0348-00
KAIG3-RFI-SW-A-0347 00 KAIG3-RFI-SW-A-0347-00
KAIG3-RFI-PA-SU-1114 00 KAIG3-RFI-PA-SU-1114-00
KAIG3-RFI-PA-S-1834 00 KAIG3-RFI-PA-S-1834-00
KAIG3-RFI-SW-A-0297 01 KAIG3-RFI-SW-A-0297-01
KAIG3-RFI-SW-A-0296 01 KAIG3-RFI-SW-A-0296-01
KAIG3-RFI-SW-A-0295 01 KAIG3-RFI-SW-A-0295-01
KAIG3-RFI-SW-P-0051 00 KAIG3-RFI-SW-P-0051-00
KAIG3-RFI-TG-P-0049 00 KAIG3-RFI-TG-P-0049-00
KAIG3-RFI-SW-A-0346 00 KAIG3-RFI-SW-A-0346-00
KAIG3-RFI-MB-A-0345 00 KAIG3-RFI-MB-A-0345-00
KAIG3-RFI-MB-A-0344 00 KAIG3-RFI-MB-A-0344-00
KAIG3-RFI-MB-A-0343 00 KAIG3-RFI-MB-A-0343-00
KAIG3-RFI-MB-A-0342 00 KAIG3-RFI-MB-A-0342-00
KAIG3-RFI-MB-A-0341 00 KAIG3-RFI-MB-A-0341-00
KAIG3-RFI-SW-SU-1112 00 KAIG3-RFI-SW-SU-1112-00
KAIG3-RFI-PA-S-1820 00 KAIG3-RFI-PA-S-1820-00
KAIG3-RFI-PA-S-1819 00 KAIG3-RFI-PA-S-1819-00
KAIG3-RFI-TB-S-1813 00 KAIG3-RFI-TB-S-1813-00
KAIG3-RFI-PA-S-1812 00 KAIG3-RFI-PA-S-1812-00
KAIG3-RFI-WG-LS-0204 00 KAIG3-RFI-WG-LS-0204-00
KAIG3-RFI-TB-SU-1111 00 KAIG3-RFI-TB-SU-1111-00
KAIG3-RFI-TB-S-1806 00 KAIG3-RFI-TB-S-1806-00
KAIG3-RFI-TB-S-1805 00 KAIG3-RFI-TB-S-1805-00
KAIG3-RFI-TB-S-1804 00 KAIG3-RFI-TB-S-1804-00
KAIG3-RFI-TB-S-1803 00 KAIG3-RFI-TB-S-1803-00
KAIG3-RFI-TB-S-1802 00 KAIG3-RFI-TB-S-1802-00
KAIG3-RFI-TB-S-1801 00 KAIG3-RFI-TB-S-1801-00
KAIG3-RFI-TB-S-1800 00 KAIG3-RFI-TB-S-1800-00
KAIG3-RFI-TB-S-1799 00 KAIG3-RFI-TB-S-1799-00
KAIG3-RFI-TB-S-1783 00 KAIG3-RFI-TB-S-1783-00
KAIG3-RFI-SW-A-0338 00 KAIG3-RFI-SW-A-0338-00
KAIG3-RFI-SW-A-0336 00 KAIG3-RFI-SW-A-0336-00
KAIG3-RFI-SW-A-0335 00 KAIG3-RFI-SW-A-0335-00
KAIG3-RFI-SW-A-0334 00 KAIG3-RFI-SW-A-0334-00
KAIG3-RFI-SW-A-0333 00 KAIG3-RFI-SW-A-0333-00
KAIG3-RFI-SW-A-0332 00 KAIG3-RFI-SW-A-0332-00
KAIG3-RFI-SW-S-1811 00 KAIG3-RFI-SW-S-1811-00
KAIG3-RFI-PA-S-1810 00 KAIG3-RFI-PA-S-1810-00
KAIG3-RFI-PA-S-1809 00 KAIG3-RFI-PA-S-1809-00
KAIG3-RFI-PA-S-1808 00 KAIG3-RFI-PA-S-1808-00
KAIG3-RFI-PA-S-1807 00 KAIG3-RFI-PA-S-1807-00
KAIG3-RFI-PA-S-1798 00 KAIG3-RFI-PA-S-1798-00
KAIG3-RFI-PA-S-1792 00 KAIG3-RFI-PA-S-1792-00
KAIG3-RFI-BO-A-0244 01 KAIG3-RFI-BO-A-0244-01
KAIG3-RFI-SW-P-0050 00 KAIG3-RFI-SW-P-0050-00
KAIG3-RFI-PA-S-1791 00 KAIG3-RFI-PA-S-1791-00
KAIG3-RFI-SW-S-1603 02 KAIG3-RFI-SW-S-1603-02
KAIG3-RFI-TB-S-1773 00 KAIG3-RFI-TB-S-1773-00
KAIG3-RFI-PA-S-1790 00 KAIG3-RFI-PA-S-1790-00
KAIG3-RFI-PA-S-1789 00 KAIG3-RFI-PA-S-1789-00
KAIG3-RFI-PA-S-1788 00 KAIG3-RFI-PA-S-1788-00
KAIG3-RFI-PA-S-1787 00 KAIG3-RFI-PA-S-1787-00
KAIG3-RFI-PA-S-1786 00 KAIG3-RFI-PA-S-1786-00
KAIG3-RFI-PA-S-1785 00 KAIG3-RFI-PA-S-1785-00
KAIG3-RFI-SW-S-1797 00 KAIG3-RFI-SW-S-1797-00
KAIG3-RFI-WG-LS-0203 00 KAIG3-RFI-WG-LS-0203-00
KAIG3-RFI-TB-SU-1108 00 KAIG3-RFI-TB-SU-1108-00
KAIG3-RFI-TB-S-1782 00 KAIG3-RFI-TB-S-1782-00
KAIG3-RFI-CO-SU-1109 00 KAIG3-RFI-CO-SU-1109-00
KAIG3-RFI-PG-S-1784 00 KAIG3-RFI-PG-S-1784-00
KAIG3-RFI-CO-SU-1110 00 KAIG3-RFI-CO-SU-1110-00
KAIG3-RFI-AG-SU-1107 00 KAIG3-RFI-AG-SU-1107-00
KAIG3-RFI-SW-S-1781 00 KAIG3-RFI-SW-S-1781-00
KAIG3-RFI-SW-S-1780 00 KAIG3-RFI-SW-S-1780-00
KAIG3-RFI-SW-S-1779 00 KAIG3-RFI-SW-S-1779-00
KAIG3-RFI-SW-S-1778 00 KAIG3-RFI-SW-S-1778-00
KAIG3-RFI-SW-A-0331 00 KAIG3-RFI-SW-A-0331-00
KAIG3-RFI-SW-A-0330 00 KAIG3-RFI-SW-A-0330-00
KAIG3-RFI-SW-A-0329 00 KAIG3-RFI-SW-A-0329-00
KAIG3-RFI-CO-S-1796 00 KAIG3-RFI-CO-S-1796-00
KAIG3-RFI-CO-S-1795 00 KAIG3-RFI-CO-S-1795-00
KAIG3-RFI-CO-S-1794 00 KAIG3-RFI-CO-S-1794-00
KAIG3-RFI-CO-S-1793 00 KAIG3-RFI-CO-S-1793-00
KAIG3-RFI-CO-S-1777 00 KAIG3-RFI-CO-S-1777-00
KAIG3-RFI-CO-S-1776 00 KAIG3-RFI-CO-S-1776-00
KAIG3-RFI-SW-S-1768 00 KAIG3-RFI-SW-S-1768-00
KAIG3-RFI-WG-S-1774 00 KAIG3-RFI-WG-S-1774-00
KAIG3-RFI-WG-A-0328 00 KAIG3-RFI-WG-A-0328-00
KAIG3-RFI-WG-A-0327 00 KAIG3-RFI-WG-A-0327-00
KAIG3-RFI-TB-SU-1104 00 KAIG3-RFI-TB-SU-1104-00
KAIG3-RFI-TB-S-1772 00 KAIG3-RFI-TB-S-1772-00
KAIG3-RFI-TB-S-1770 00 KAIG3-RFI-TB-S-1770-00
KAIG3-RFI-SW-S-1775 00 KAIG3-RFI-SW-S-1775-00
KAIG3-RFI-TB-S-1769 00 KAIG3-RFI-TB-S-1769-00
KAIG3-RFI-SG-SU-1106 00 KAIG3-RFI-SG-SU-1106-00
KAIG3-RFI-PA-SU-1105 00 KAIG3-RFI-PA-SU-1105-00
KAIG3-RFI-PA-S-1771 00 KAIG3-RFI-PA-S-1771-00
KAIG3-RFI-SG-P-0048 00 KAIG3-RFI-SG-P-0048-00
KAIG3-RFI-SW-LS-0202 00 KAIG3-RFI-SW-LS-0202-00
KAIG3-RFI-SW-S-1767 00 KAIG3-RFI-SW-S-1767-00
KAIG3-RFI-SW-LS-0200 00 KAIG3-RFI-SW-LS-0200-00
KAIG3-RFI-SW-LS-0201 00 KAIG3-RFI-SW-LS-0201-00
KAIG3-RFI-ZG-S-1763 00 KAIG3-RFI-ZG-S-1763-00
KAIG3-RFI-WG-LS-0194 00 KAIG3-RFI-WG-LS-0194-00
KAIG3-RFI-TB-S-1765 00 KAIG3-RFI-TB-S-1765-00
KAIG3-RFI-TB-S-1764 00 KAIG3-RFI-TB-S-1764-00
KAIG3-RFI-SW-LS-0196 00 KAIG3-RFI-SW-LS-0196-00
KAIG3-RFI-SW-LS-0195 00 KAIG3-RFI-SW-LS-0195-00
KAIG3-RFI-PA-S-1754 00 KAIG3-RFI-PA-S-1754-00
KAIG3-RFI-SW-A-0325 00 KAIG3-RFI-SW-A-0325-00
KAIG3-RFI-SW-S-1762 00 KAIG3-RFI-SW-S-1762-00
KAIG3-RFI-PA-S-1761 00 KAIG3-RFI-PA-S-1761-00
KAIG3-RFI-PA-S-1760 00 KAIG3-RFI-PA-S-1760-00
KAIG3-RFI-PA-S-1759 00 KAIG3-RFI-PA-S-1759-00
KAIG3-RFI-PA-S-1757 00 KAIG3-RFI-PA-S-1757-00
KAIG3-RFI-PA-S-1756 00 KAIG3-RFI-PA-S-1756-00
KAIG3-RFI-PA-S-1755 00 KAIG3-RFI-PA-S-1755-00
KAIG3-RFI-PA-S-1753 00 KAIG3-RFI-PA-S-1753-00
KAIG3-RFI-PA-S-1752 00 KAIG3-RFI-PA-S-1752-00
KAIG3-RFI-PA-S-1751 00 KAIG3-RFI-PA-S-1751-00
KAIG3-RFI-PA-S-1750 00 KAIG3-RFI-PA-S-1750-00
KAIG3-RFI-PA-S-1749 00 KAIG3-RFI-PA-S-1749-00
KAIG3-RFI-PA-S-1748 00 KAIG3-RFI-PA-S-1748-00
KAIG3-RFI-PA-S-1747 00 KAIG3-RFI-PA-S-1747-00
KAIG3-RFI-CO-SU-1103 00 KAIG3-RFI-CO-SU-1103-00
KAIG3-RFI-WG-SU-1102 00 KAIG3-RFI-WG-SU-1102-00
KAIG3-RFI-WG-S-1758 00 KAIG3-RFI-WG-S-1758-00
KAIG3-RFI-SW-A-0323 00 KAIG3-RFI-SW-A-0323-00
KAIG3-RFI-SW-A-0322 00 KAIG3-RFI-SW-A-0322-00
KAIG3-RFI-MB-A-0324 00 KAIG3-RFI-MB-A-0324-00
KAIG3-RFI-CO-SU-1100 00 KAIG3-RFI-CO-SU-1100-00
KAIG3-RFI-CO-SU-1099 00 KAIG3-RFI-CO-SU-1099-00
KAIG3-RFI-CO-S-1742 00 KAIG3-RFI-CO-S-1742-00
KAIG3-RFI-CO-S-1743 00 KAIG3-RFI-CO-S-1743-00
KAIG3-RFI-WG-LS-0164 00 KAIG3-RFI-WG-LS-0164-00
KAIG3-RFI-SW-S-1746 00 KAIG3-RFI-SW-S-1746-00
KAIG3-RFI-SW-S-1745 00 KAIG3-RFI-SW-S-1745-00
KAIG3-RFI-SW-S-1744 00 KAIG3-RFI-SW-S-1744-00
KAIG3-RFI-SW-A-0321 00 KAIG3-RFI-SW-A-0321-00
KAIG3-RFI-AG-SU-1101 00 KAIG3-RFI-AG-SU-1101-00
KAIG3-RFI-PA-S-1741 00 KAIG3-RFI-PA-S-1741-00
KAIG3-RFI-PA-S-1740 00 KAIG3-RFI-PA-S-1740-00
KAIG3-RFI-PA-S-1739 00 KAIG3-RFI-PA-S-1739-00
KAIG3-RFI-PA-S-1738 00 KAIG3-RFI-PA-S-1738-00
KAIG3-RFI-PA-S-1737 00 KAIG3-RFI-PA-S-1737-00
KAIG3-RFI-SW-LS-0193 00 KAIG3-RFI-SW-LS-0193-00
KAIG3-RFI-SW-LS-0192 00 KAIG3-RFI-SW-LS-0192-00
KAIG3-RFI-ZG-LC-0121 00 KAIG3-RFI-ZG-LC-0121-00
KAIG3-RFI-ZG-E-0140 00 KAIG3-RFI-ZG-E-0140-00
KAIG3-RFI-TB-SU-1098 00 KAIG3-RFI-TB-SU-1098-00
KAIG3-RFI-TB-S-1736 00 KAIG3-RFI-TB-S-1736-00
KAIG3-RFI-SW-S-1735 00 KAIG3-RFI-SW-S-1735-00
KAIG3-RFI-SW-S-1734 00 KAIG3-RFI-SW-S-1734-00
KAIG3-RFI-SW-LS-0127 01 KAIG3-RFI-SW-LS-0127-01
KAIG3-RFI-CO-SU-1096 00 KAIG3-RFI-CO-SU-1096-00
KAIG3-RFI-CO-SU-1095 00 KAIG3-RFI-CO-SU-1095-00
KAIG3-RFI-CO-S-1718 00 KAIG3-RFI-CO-S-1718-00
KAIG3-RFI-CO-S-1717 00 KAIG3-RFI-CO-S-1717-00
KAIG3-RFI-WG-SU-1097 00 KAIG3-RFI-WG-SU-1097-00
KAIG3-RFI-SW-LS-0191 00 KAIG3-RFI-SW-LS-0191-00
KAIG3-RFI-SW-LS-0190 00 KAIG3-RFI-SW-LS-0190-00
KAIG3-RFI-PA-S-1733 00 KAIG3-RFI-PA-S-1733-00
KAIG3-RFI-PA-S-1732 00 KAIG3-RFI-PA-S-1732-00
KAIG3-RFI-PA-S-1731 00 KAIG3-RFI-PA-S-1731-00
KAIG3-RFI-DG-E-0139 00 KAIG3-RFI-DG-E-0139-00
KAIG3-RFI-DG-LC-0120 00 KAIG3-RFI-DG-LC-0120-00
KAIG3-RFI-SW-S-1730 00 KAIG3-RFI-SW-S-1730-00
KAIG3-RFI-TG-S-1726 00 KAIG3-RFI-TG-S-1726-00
KAIG3-RFI-TB-SU-1094 00 KAIG3-RFI-TB-SU-1094-00
KAIG3-RFI-TB-SU-1093 00 KAIG3-RFI-TB-SU-1093-00
KAIG3-RFI-TB-S-1729 00 KAIG3-RFI-TB-S-1729-00
KAIG3-RFI-TB-S-1728 00 KAIG3-RFI-TB-S-1728-00
KAIG3-RFI-DG-A-0320 00 KAIG3-RFI-DG-A-0320-00
KAIG3-RFI-GN-LS-0063 04 KAIG3-RFI-GN-LS-0063-04
KAIG3-RFI-SW-P-0043 02 KAIG3-RFI-SW-P-0043-02
KAIG3-RFI-SW-P-0045 02 KAIG3-RFI-SW-P-0045-02
KAIG3-RFI-SW-A-0300 01 KAIG3-RFI-SW-A-0300-01
KAIG3-RFI-SW-S-1528 01 KAIG3-RFI-SW-S-1528-01
KAIG3-RFI-WG-LS-0186 00 KAIG3-RFI-WG-LS-0186-00
KAIG3-RFI-TB-SU-1092 00 KAIG3-RFI-TB-SU-1092-00
KAIG3-RFI-TB-S-1724 00 KAIG3-RFI-TB-S-1724-00
KAIG3-RFI-SG-S-1723 00 KAIG3-RFI-SG-S-1723-00
KAIG3-RFI-MB-S-1725 00 KAIG3-RFI-MB-S-1725-00
KAIG3-RFI-PA-S-1727 00 KAIG3-RFI-PA-S-1727-00
KAIG3-RFI-PA-S-1722 00 KAIG3-RFI-PA-S-1722-00
KAIG3-RFI-SW-S-1719 00 KAIG3-RFI-SW-S-1719-00
KAIG3-RFI-SW-LS-0188 00 KAIG3-RFI-SW-LS-0188-00
KAIG3-RFI-SW-LS-0187 00 KAIG3-RFI-SW-LS-0187-00
KAIG3-RFI-SW-A-0319 00 KAIG3-RFI-SW-A-0319-00
KAIG3-RFI-PA-S-1721 00 KAIG3-RFI-PA-S-1721-00
KAIG3-RFI-PA-S-1720 00 KAIG3-RFI-PA-S-1720-00
KAIG3-RFI-SW-LS-0189 00 KAIG3-RFI-SW-LS-0189-00
KAIG3-RFI-WG-LS-0164 01 KAIG3-RFI-WG-LS-0164-01
KAIG3-RFI-SW-S-1603 01 KAIG3-RFI-SW-S-1603-01
KAIG3-RFI-CO-S-1716 00 KAIG3-RFI-CO-S-1716-00
KAIG3-RFI-CO-S-1715 00 KAIG3-RFI-CO-S-1715-00
KAIG3-RFI-CO-S-1714 00 KAIG3-RFI-CO-S-1714-00
KAIG3-RFI-CO-S-1713 00 KAIG3-RFI-CO-S-1713-00
KAIG3-RFI-CO-S-1711 00 KAIG3-RFI-CO-S-1711-00
KAIG3-RFI-CO-S-1712 00 KAIG3-RFI-CO-S-1712-00
KAIG3-RFI-ZG-S-1705 00 KAIG3-RFI-ZG-S-1705-00
KAIG3-RFI-ZG-A-0315 00 KAIG3-RFI-ZG-A-0315-00
KAIG3-RFI-SW-A-0318 00 KAIG3-RFI-SW-A-0318-00
KAIG3-RFI-SW-A-0317 00 KAIG3-RFI-SW-A-0317-00
KAIG3-RFI-SW-A-0316 00 KAIG3-RFI-SW-A-0316-00
KAIG3-RFI-PA-S-1710 00 KAIG3-RFI-PA-S-1710-00
KAIG3-RFI-PA-S-1709 00 KAIG3-RFI-PA-S-1709-00
KAIG3-RFI-PA-S-1481 00 KAIG3-RFI-PA-S-1481-00
KAIG3-RFI-SW-P-0047 00 KAIG3-RFI-SW-P-0047-00
KAIG3-RFI-TB-E-0138 00 KAIG3-RFI-TB-E-0138-00
KAIG3-RFI-PG-SU-1089 00 KAIG3-RFI-PG-SU-1089-00
KAIG3-RFI-TB-E-0137 00 KAIG3-RFI-TB-E-0137-00
KAIG3-RFI-TB-E-0136 00 KAIG3-RFI-TB-E-0136-00
KAIG3-RFI-TB-E-0135 00 KAIG3-RFI-TB-E-0135-00
KAIG3-RFI-PG-SU-1088 00 KAIG3-RFI-PG-SU-1088-00
KAIG3-RFI-TB-E-0134 00 KAIG3-RFI-TB-E-0134-00
KAIG3-RFI-TB-E-0133 00 KAIG3-RFI-TB-E-0133-00
KAIG3-RFI-PA-SU-1091 00 KAIG3-RFI-PA-SU-1091-00
KAIG3-RFI-TB-E-0132 00 KAIG3-RFI-TB-E-0132-00
KAIG3-RFI-TB-E-0131 00 KAIG3-RFI-TB-E-0131-00
KAIG3-RFI-PA-S-1669 00 KAIG3-RFI-PA-S-1669-00
KAIG3-RFI-TB-LC-0119 00 KAIG3-RFI-TB-LC-0119-00
KAIG3-RFI-TB-LC-0118 00 KAIG3-RFI-TB-LC-0118-00
KAIG3-RFI-PA-S-1702 00 KAIG3-RFI-PA-S-1702-00
KAIG3-RFI-PA-S-1684 00 KAIG3-RFI-PA-S-1684-00
KAIG3-RFI-TB-LC-0117 00 KAIG3-RFI-TB-LC-0117-00
KAIG3-RFI-TB-E-0130 00 KAIG3-RFI-TB-E-0130-00
KAIG3-RFI-TB-E-0129 00 KAIG3-RFI-TB-E-0129-00
KAIG3-RFI-TB-E-0128 00 KAIG3-RFI-TB-E-0128-00
KAIG3-RFI-TB-E-0127 00 KAIG3-RFI-TB-E-0127-00
KAIG3-RFI-SW-S-1440 01 KAIG3-RFI-SW-S-1440-01
KAIG3-RFI-WG-SU-1087 00 KAIG3-RFI-WG-SU-1087-00
KAIG3-RFI-WG-SU-1086 00 KAIG3-RFI-WG-SU-1086-00
KAIG3-RFI-WG-SU-1085 00 KAIG3-RFI-WG-SU-1085-00
KAIG3-RFI-SW-S-1701 00 KAIG3-RFI-SW-S-1701-00
KAIG3-RFI-SW-S-1700 00 KAIG3-RFI-SW-S-1700-00
KAIG3-RFI-SW-S-1699 00 KAIG3-RFI-SW-S-1699-00
KAIG3-RFI-SW-S-1698 00 KAIG3-RFI-SW-S-1698-00
KAIG3-RFI-MB-S-1704 00 KAIG3-RFI-MB-S-1704-00
KAIG3-RFI-MB-S-1675 00 KAIG3-RFI-MB-S-1675-00
KAIG3-RFI-MB-A-0314 00 KAIG3-RFI-MB-A-0314-00
KAIG3-RFI-DG-S-1697 00 KAIG3-RFI-DG-S-1697-00
KAIG3-RFI-DG-S-1696 00 KAIG3-RFI-DG-S-1696-00
KAIG3-RFI-DG-S-1695 00 KAIG3-RFI-DG-S-1695-00
KAIG3-RFI-DG-S-1694 00 KAIG3-RFI-DG-S-1694-00
KAIG3-RFI-PA-S-1708 00 KAIG3-RFI-PA-S-1708-00
KAIG3-RFI-CO-SU-1090 00 KAIG3-RFI-CO-SU-1090-00
KAIG3-RFI-CO-SU-1084 00 KAIG3-RFI-CO-SU-1084-00
KAIG3-RFI-PA-S-1707 00 KAIG3-RFI-PA-S-1707-00
KAIG3-RFI-PA-S-1706 00 KAIG3-RFI-PA-S-1706-00
KAIG3-RFI-TB-LC-0113 01 KAIG3-RFI-TB-LC-0113-01
KAIG3-RFI-PA-S-1703 00 KAIG3-RFI-PA-S-1703-00
KAIG3-RFI-SW-LS-0185 00 KAIG3-RFI-SW-LS-0185-00
KAIG3-RFI-SW-LS-0184 00 KAIG3-RFI-SW-LS-0184-00
KAIG3-RFI-SW-LS-0183 00 KAIG3-RFI-SW-LS-0183-00
KAIG3-RFI-SW-A-0312 00 KAIG3-RFI-SW-A-0312-00
KAIG3-RFI-SW-A-0311 00 KAIG3-RFI-SW-A-0311-00
KAIG3-RFI-PA-S-1689 00 KAIG3-RFI-PA-S-1689-00
KAIG3-RFI-PA-S-1688 00 KAIG3-RFI-PA-S-1688-00
KAIG3-RFI-PA-S-1687 00 KAIG3-RFI-PA-S-1687-00
KAIG3-RFI-PA-S-1686 00 KAIG3-RFI-PA-S-1686-00
KAIG3-RFI-PA-S-1685 00 KAIG3-RFI-PA-S-1685-00
KAIG3-RFI-PA-S-1683 00 KAIG3-RFI-PA-S-1683-00
KAIG3-RFI-PA-S-1682 00 KAIG3-RFI-PA-S-1682-00
KAIG3-RFI-WG-E-0126 00 KAIG3-RFI-WG-E-0126-00
KAIG3-RFI-PG-SU-1083 00 KAIG3-RFI-PG-SU-1083-00
KAIG3-RFI-PG-SU-1082 00 KAIG3-RFI-PG-SU-1082-00
KAIG3-RFI-ZG-S-1693 00 KAIG3-RFI-ZG-S-1693-00
KAIG3-RFI-ZG-S-1692 00 KAIG3-RFI-ZG-S-1692-00
KAIG3-RFI-ZG-S-1691 00 KAIG3-RFI-ZG-S-1691-00
KAIG3-RFI-ZG-S-1690 00 KAIG3-RFI-ZG-S-1690-00
KAIG3-RFI-ZG-A-0306 00 KAIG3-RFI-ZG-A-0306-00
KAIG3-RFI-ZG-A-0305 00 KAIG3-RFI-ZG-A-0305-00
KAIG3-RFI-ZG-A-0304 00 KAIG3-RFI-ZG-A-0304-00
KAIG3-RFI-WG-LS-0181 00 KAIG3-RFI-WG-LS-0181-00
KAIG3-RFI-SW-A-0310 00 KAIG3-RFI-SW-A-0310-00
KAIG3-RFI-MB-SU-1081 00 KAIG3-RFI-MB-SU-1081-00
KAIG3-RFI-BO-E-0125 00 KAIG3-RFI-BO-E-0125-00
KAIG3-RFI-BO-E-0124 00 KAIG3-RFI-BO-E-0124-00
KAIG3-RFI-BO-LC-0116 00 KAIG3-RFI-BO-LC-0116-00
KAIG3-RFI-BO-LC-0115 00 KAIG3-RFI-BO-LC-0115-00
KAIG3-RFI-MB-S-1674 00 KAIG3-RFI-MB-S-1674-00
KAIG3-RFI-DG-A-0309 00 KAIG3-RFI-DG-A-0309-00
KAIG3-RFI-DG-A-0308 00 KAIG3-RFI-DG-A-0308-00
KAIG3-RFI-DG-A-0307 00 KAIG3-RFI-DG-A-0307-00
KAIG3-RFI-SW-S-1681 00 KAIG3-RFI-SW-S-1681-00
KAIG3-RFI-SW-S-1676 00 KAIG3-RFI-SW-S-1676-00
KAIG3-RFI-SW-S-1668 00 KAIG3-RFI-SW-S-1668-00
KAIG3-RFI-SW-S-1667 00 KAIG3-RFI-SW-S-1667-00
KAIG3-RFI-SW-LS-0182 00 KAIG3-RFI-SW-LS-0182-00
KAIG3-RFI-SW-LS-0180 00 KAIG3-RFI-SW-LS-0180-00
KAIG3-RFI-SW-LS-0179 00 KAIG3-RFI-SW-LS-0179-00
KAIG3-RFI-SW-LS-0178 00 KAIG3-RFI-SW-LS-0178-00
KAIG3-RFI-PA-S-1680 00 KAIG3-RFI-PA-S-1680-00
KAIG3-RFI-PA-S-1679 00 KAIG3-RFI-PA-S-1679-00
KAIG3-RFI-PA-S-1678 00 KAIG3-RFI-PA-S-1678-00
KAIG3-RFI-PA-S-1677 00 KAIG3-RFI-PA-S-1677-00
KAIG3-RFI-SG-P-0046 00 KAIG3-RFI-SG-P-0046-00
KAIG3-RFI-BO-LC-0114 00 KAIG3-RFI-BO-LC-0114-00
KAIG3-RFI-BO-E-0123 00 KAIG3-RFI-BO-E-0123-00
KAIG3-RFI-CO-S-1666 00 KAIG3-RFI-CO-S-1666-00
KAIG3-RFI-CO-S-1664 00 KAIG3-RFI-CO-S-1664-00
KAIG3-RFI-CO-SU-1080 00 KAIG3-RFI-CO-SU-1080-00
KAIG3-RFI-CO-S-1665 00 KAIG3-RFI-CO-S-1665-00
KAIG3-RFI-SW-LS-0176 00 KAIG3-RFI-SW-LS-0176-00
KAIG3-RFI-SW-LS-0177 00 KAIG3-RFI-SW-LS-0177-00
KAIG3-RFI-MB-S-1662 00 KAIG3-RFI-MB-S-1662-00
KAIG3-RFI-MB-S-1663 00 KAIG3-RFI-MB-S-1663-00
KAIG3-RFI-MB-SU-1079 00 KAIG3-RFI-MB-SU-1079-00
KAIG3-RFI-TB-SU-1078 00 KAIG3-RFI-TB-SU-1078-00
KAIG3-RFI-WG-S-1660 00 KAIG3-RFI-WG-S-1660-00
KAIG3-RFI-WG-S-1661 00 KAIG3-RFI-WG-S-1661-00
KAIG3-RFI-NU-GE-0452 00 KAIG3-RFI-NU-GE-0452-00
KAIG3-RFI-NU-SU-1077 00 KAIG3-RFI-NU-SU-1077-00
KAIG3-RFI-CO-SU-1064 00 KAIG3-RFI-CO-SU-1064-00
KAIG3-RFI-CO-GE-0451 00 KAIG3-RFI-CO-GE-0451-00
KAIG3-RFI-SW-A-0303-00 00 KAIG3-RFI-SW-A-0303-00-00
KAIG3-RFI-SW-S-1646 00 KAIG3-RFI-SW-S-1646-00
KAIG3-RFI-CO-S-1644 00 KAIG3-RFI-CO-S-1644-00
KAIG3-RFI-CO-S-1643 00 KAIG3-RFI-CO-S-1643-00
KAIG3-RFI-CO-S-1642 00 KAIG3-RFI-CO-S-1642-00
KAIG3-RFI-CO-S-1641 00 KAIG3-RFI-CO-S-1641-00
KAIG3-RFI-SW-LS-0158 01 KAIG3-RFI-SW-LS-0158-01
KAIG3-RFI-PA-S-1650 00 KAIG3-RFI-PA-S-1650-00
KAIG3-RFI-SW-SU-1076 00 KAIG3-RFI-SW-SU-1076-00
KAIG3-RFI-SW-SU-1075 00 KAIG3-RFI-SW-SU-1075-00
KAIG3-RFI-ZG-SU-1074 00 KAIG3-RFI-ZG-SU-1074-00
KAIG3-RFI-SW-S-1649 00 KAIG3-RFI-SW-S-1649-00
KAIG3-RFI-SW-S-1648 00 KAIG3-RFI-SW-S-1648-00
KAIG3-RFI-SW-S-1647 00 KAIG3-RFI-SW-S-1647-00
KAIG3-RFI-SW-A-0302 00 KAIG3-RFI-SW-A-0302-00
KAIG3-RFI-SW-A-0301 00 KAIG3-RFI-SW-A-0301-00
KAIG3-RFI-SW-LS-0169 00 KAIG3-RFI-SW-LS-0169-00
KAIG3-RFI-SW-LS-0175 00 KAIG3-RFI-SW-LS-0175-00
KAIG3-RFI-SW-S-1659 00 KAIG3-RFI-SW-S-1659-00
KAIG3-RFI-SW-SU-1069 00 KAIG3-RFI-SW-SU-1069-00
KAIG3-RFI-SW-SU-1070 00 KAIG3-RFI-SW-SU-1070-00
KAIG3-RFI-SW-SU-1071 00 KAIG3-RFI-SW-SU-1071-00
KAIG3-RFI-SW-SU-1072 00 KAIG3-RFI-SW-SU-1072-00
KAIG3-RFI-SW-S-1526 01 KAIG3-RFI-SW-S-1526-01
KAIG3-RFI-CO-S-1658 00 KAIG3-RFI-CO-S-1658-00
KAIG3-RFI-CO-S-1657 00 KAIG3-RFI-CO-S-1657-00
KAIG3-RFI-CO-SU-1073 00 KAIG3-RFI-CO-SU-1073-00
KAIG3-RFI-SW-P-0043 01 KAIG3-RFI-SW-P-0043-01
KAIG3-RFI-WG-SU-1068 00 KAIG3-RFI-WG-SU-1068-00
KAIG3-RFI-SG-S-1656 00 KAIG3-RFI-SG-S-1656-00
KAIG3-RFI-SW-S-1543 01 KAIG3-RFI-SW-S-1543-01
KAIG3-RFI-SW-LS-0170 01 KAIG3-RFI-SW-LS-0170-01
KAIG3-RFI-PA-S-1653 00 KAIG3-RFI-PA-S-1653-00
KAIG3-RFI-SW-SU-1066 00 KAIG3-RFI-SW-SU-1066-00
KAIG3-RFI-SW-S-1652 00 KAIG3-RFI-SW-S-1652-00
KAIG3-RFI-SW-LS-0173 00 KAIG3-RFI-SW-LS-0173-00
KAIG3-RFI-SW-A-0286 00 KAIG3-RFI-SW-A-0286-00
KAIG3-RFI-SW-P-0045 01 KAIG3-RFI-SW-P-0045-01
KAIG3-RFI-PA-S-1651 00 KAIG3-RFI-PA-S-1651-00
KAIG3-RFI-SW-LS-0174 00 KAIG3-RFI-SW-LS-0174-00
KAIG3-RFI-CO-S-1655 00 KAIG3-RFI-CO-S-1655-00
KAIG3-RFI-CO-S-1654 00 KAIG3-RFI-CO-S-1654-00
KAIG3-RFI-CO-SU-1067 00 KAIG3-RFI-CO-SU-1067-00
KAIG3-RFI-MB-S-1626 00 KAIG3-RFI-MB-S-1626-00
KAIG3-RFI-WG-SU-1065 00 KAIG3-RFI-WG-SU-1065-00
KAIG3-RFI-TB-SU-1028 01 KAIG3-RFI-TB-SU-1028-01
KAIG3-RFI-SW-LS-0153 01 KAIG3-RFI-SW-LS-0153-01
KAIG3-RFI-SW-S-1630 00 KAIG3-RFI-SW-S-1630-00
KAIG3-RFI-SW-S-1631 00 KAIG3-RFI-SW-S-1631-00
KAIG3-RFI-PA-S-1632 00 KAIG3-RFI-PA-S-1632-00
KAIG3-RFI-PA-S-1634 00 KAIG3-RFI-PA-S-1634-00
KAIG3-RFI-SW-A-0300 00 KAIG3-RFI-SW-A-0300-00
KAIG3-RFI-PG-SU-1063 00 KAIG3-RFI-PG-SU-1063-00
KAIG3-RFI-ZG-S-1629 00 KAIG3-RFI-ZG-S-1629-00
KAIG3-RFI-SW-S-1619 00 KAIG3-RFI-SW-S-1619-00
KAIG3-RFI-ZG-S-1628 00 KAIG3-RFI-ZG-S-1628-00
KAIG3-RFI-TB-E-0119 00 KAIG3-RFI-TB-E-0119-00
KAIG3-RFI-TB-E-0118 00 KAIG3-RFI-TB-E-0118-00
KAIG3-RFI-TB-E-0117 00 KAIG3-RFI-TB-E-0117-00
KAIG3-RFI-TB-E-0116 00 KAIG3-RFI-TB-E-0116-00
KAIG3-RFI-TB-E-0114 00 KAIG3-RFI-TB-E-0114-00
KAIG3-RFI-CO-S-1640 00 KAIG3-RFI-CO-S-1640-00
KAIG3-RFI-CO-S-1639 00 KAIG3-RFI-CO-S-1639-00
KAIG3-RFI-CO-S-1638 00 KAIG3-RFI-CO-S-1638-00
KAIG3-RFI-CO-S-1637 00 KAIG3-RFI-CO-S-1637-00
KAIG3-RFI-CO-S-1636 00 KAIG3-RFI-CO-S-1636-00
KAIG3-RFI-CO-S-1635 00 KAIG3-RFI-CO-S-1635-00
KAIG3-RFI-TB-LC-0113 00 KAIG3-RFI-TB-LC-0113-00
KAIG3-RFI-TB-E-0122 00 KAIG3-RFI-TB-E-0122-00
KAIG3-RFI-TB-E-0121 00 KAIG3-RFI-TB-E-0121-00
KAIG3-RFI-WG-E-0120 00 KAIG3-RFI-WG-E-0120-00
KAIG3-RFI-PA-S-1633 00 KAIG3-RFI-PA-S-1633-00
KAIG3-RFI-SW-LS-0172 00 KAIG3-RFI-SW-LS-0172-00
KAIG3-RFI-TB-E-0115 00 KAIG3-RFI-TB-E-0115-00
KAIG3-RFI-SW-LS-0153 00 KAIG3-RFI-SW-LS-0153-00
KAIG3-RFI-WG-SU-1061 00 KAIG3-RFI-WG-SU-1061-00
KAIG3-RFI-WG-SU-1062 00 KAIG3-RFI-WG-SU-1062-00
KAIG3-RFI-MB-SU-1059 00 KAIG3-RFI-MB-SU-1059-00
KAIG3-RFI-MB-S-1625 00 KAIG3-RFI-MB-S-1625-00
KAIG3-RFI-WG-LS-0163 00 KAIG3-RFI-WG-LS-0163-00
KAIG3-RFI-TB-S-1617 00 KAIG3-RFI-TB-S-1617-00
KAIG3-RFI-TB-S-1616 00 KAIG3-RFI-TB-S-1616-00
KAIG3-RFI-PG-S-1618 00 KAIG3-RFI-PG-S-1618-00
KAIG3-RFI-PG-S-1620 00 KAIG3-RFI-PG-S-1620-00
KAIG3-RFI-ZG-S-1621 00 KAIG3-RFI-ZG-S-1621-00
KAIG3-RFI-ZG-S-1623 00 KAIG3-RFI-ZG-S-1623-00
KAIG3-RFI-WG-SU-1060 00 KAIG3-RFI-WG-SU-1060-00
KAIG3-RFI-MB-S-1611 00 KAIG3-RFI-MB-S-1611-00
KAIG3-RFI-SW-LS-0171 00 KAIG3-RFI-SW-LS-0171-00
KAIG3-RFI-PA-S-1615 00 KAIG3-RFI-PA-S-1615-00
KAIG3-RFI-SW-LS-0170 00 KAIG3-RFI-SW-LS-0170-00
KAIG3-RFI-PA-S-1614 00 KAIG3-RFI-PA-S-1614-00
KAIG3-RFI-TB-SU-1058 00 KAIG3-RFI-TB-SU-1058-00
KAIG3-RFI-TB-SU-1057 00 KAIG3-RFI-TB-SU-1057-00
KAIG3-RFI-PG-SU-1056 00 KAIG3-RFI-PG-SU-1056-00
KAIG3-RFI-MB-SU-1055-00 00 KAIG3-RFI-MB-SU-1055-00-00
KAIG3-RFI-MB-S-1600 00 KAIG3-RFI-MB-S-1600-00
KAIG3-RFI-MB-A-0298-00 00 KAIG3-RFI-MB-A-0298-00-00
KAIG3-RFI-MB-A-0299 00 KAIG3-RFI-MB-A-0299-00
KAIG3-RFI-SW-SU-1053 00 KAIG3-RFI-SW-SU-1053-00
KAIG3-RFI-PA-S-1592 00 KAIG3-RFI-PA-S-1592-00
KAIG3-RFI-PA-S-1591 00 KAIG3-RFI-PA-S-1591-00
KAIG3-RFI-SM-S-1610 00 KAIG3-RFI-SM-S-1610-00
KAIG3-RFI-SM-S-1609 00 KAIG3-RFI-SM-S-1609-00
KAIG3-RFI-SM-S-1608 00 KAIG3-RFI-SM-S-1608-00
KAIG3-RFI-SM-S-1607 00 KAIG3-RFI-SM-S-1607-00
KAIG3-RFI-SM-S-1606 00 KAIG3-RFI-SM-S-1606-00
KAIG3-RFI-CO-S-1605 00 KAIG3-RFI-CO-S-1605-00
KAIG3-RFI-CO-S-1604 00 KAIG3-RFI-CO-S-1604-00
KAIG3-RFI-GN-LS-0061 01 KAIG3-RFI-GN-LS-0061-01
KAIG3-RFI-SW-LS-0166 00 KAIG3-RFI-SW-LS-0166-00
KAIG3-RFI-SW-LS-0167 00 KAIG3-RFI-SW-LS-0167-00
KAIG3-RFI-CO-SU-1054 00 KAIG3-RFI-CO-SU-1054-00
KAIG3-RFI-SW-LS-0168 00 KAIG3-RFI-SW-LS-0168-00
KAIG3-RFI-BO-LC-0112 00 KAIG3-RFI-BO-LC-0112-00
KAIG3-RFI-TG-E-0113 00 KAIG3-RFI-TG-E-0113-00
KAIG3-RFI-DG-E-0112 00 KAIG3-RFI-DG-E-0112-00
KAIG3-RFI-BO-E-0111-00 00 KAIG3-RFI-BO-E-0111-00-00
KAIG3-RFI-SW-LS-0165 00 KAIG3-RFI-SW-LS-0165-00
KAIG3-RFI-SW-S-1603 00 KAIG3-RFI-SW-S-1603-00
KAIG3-RFI-PA-S-1598 00 KAIG3-RFI-PA-S-1598-00
KAIG3-RFI-SW-S-1599 00 KAIG3-RFI-SW-S-1599-00
KAIG3-RFI-PA-S-1597 00 KAIG3-RFI-PA-S-1597-00
KAIG3-RFI-PA-S-1596 00 KAIG3-RFI-PA-S-1596-00
KAIG3-RFI-SW-A-0297 00 KAIG3-RFI-SW-A-0297-00
KAIG3-RFI-SW-A-0296 00 KAIG3-RFI-SW-A-0296-00
KAIG3-RFI-PG-SU-1052 00 KAIG3-RFI-PG-SU-1052-00
KAIG3-RFI-CO-S-1602 00 KAIG3-RFI-CO-S-1602-00
KAIG3-RFI-CO-S-1601 00 KAIG3-RFI-CO-S-1601-00
KAIG3-RFI-CO-SU-1051 00 KAIG3-RFI-CO-SU-1051-00
KAIG3-RFI-EC-GE-0443 00 KAIG3-RFI-EC-GE-0443-00
KAIG3-RFI-BO-E-0110 00 KAIG3-RFI-BO-E-0110-00
KAIG3-RFI-BO-LC-0111 00 KAIG3-RFI-BO-LC-0111-00
KAIG3-RFI-SW-LS-0162 00 KAIG3-RFI-SW-LS-0162-00
KAIG3-RFI-SW-LS-0161 00 KAIG3-RFI-SW-LS-0161-00
KAIG3-RFI-SW-LS-0092 01 KAIG3-RFI-SW-LS-0092-01
KAIG3-RFI-TB-SU-1027 01 KAIG3-RFI-TB-SU-1027-01
KAIG3-RFI-PA-S-1589 00 KAIG3-RFI-PA-S-1589-00
KAIG3-RFI-PA-S-1590 00 KAIG3-RFI-PA-S-1590-00
KAIG3-RFI-SW-S-1593 00 KAIG3-RFI-SW-S-1593-00
KAIG3-RFI-SW-S-1594 00 KAIG3-RFI-SW-S-1594-00
KAIG3-RFI-SW-S-1595 00 KAIG3-RFI-SW-S-1595-00
KAIG3-RFI-SW-SU-1050 00 KAIG3-RFI-SW-SU-1050-00
KAIG3-RFI-CO-SU-1033 01 KAIG3-RFI-CO-SU-1033-01
KAIG3-RFI-WG-LS-0144 00 KAIG3-RFI-WG-LS-0144-00
KAIG3-RFI-SW-A-0138 00 KAIG3-RFI-SW-A-0138-00
KAIG3-RFI-BO-LC-0110 00 KAIG3-RFI-BO-LC-0110-00
KAIG3-RFI-BO-E-0109 00 KAIG3-RFI-BO-E-0109-00
KAIG3-RFI-SW-LS-0106 01 KAIG3-RFI-SW-LS-0106-01
KAIG3-RFI-SW-SU-1048 00 KAIG3-RFI-SW-SU-1048-00
KAIG3-RFI-SW-S-1541 01 KAIG3-RFI-SW-S-1541-01
KAIG3-RFI-SW-LS-0130 01 KAIG3-RFI-SW-LS-0130-01
KAIG3-RFI-SW-A-0295 00 KAIG3-RFI-SW-A-0295-00
KAIG3-RFI-DG-S-1582 00 KAIG3-RFI-DG-S-1582-00
KAIG3-RFI-SW-SU-1046 00 KAIG3-RFI-SW-SU-1046-00
KAIG3-RFI-SW-S-1575 00 KAIG3-RFI-SW-S-1575-00
KAIG3-RFI-SW-S-1574 00 KAIG3-RFI-SW-S-1574-00
KAIG3-RFI-SW-SU-1047 00 KAIG3-RFI-SW-SU-1047-00
KAIG3-RFI-SW-S-1515 01 KAIG3-RFI-SW-S-1515-01
KAIG3-RFI-PA-S-1581 00 KAIG3-RFI-PA-S-1581-00
KAIG3-RFI-PA-S-1580 00 KAIG3-RFI-PA-S-1580-00
KAIG3-RFI-PA-S-1579 00 KAIG3-RFI-PA-S-1579-00
KAIG3-RFI-PA-S-1578 00 KAIG3-RFI-PA-S-1578-00
KAIG3-RFI-PA-S-1577 00 KAIG3-RFI-PA-S-1577-00
KAIG3-RFI-CO-S-1587 00 KAIG3-RFI-CO-S-1587-00
KAIG3-RFI-PA-S-1576 00 KAIG3-RFI-PA-S-1576-00
KAIG3-RFI-CO-S-1585 00 KAIG3-RFI-CO-S-1585-00
KAIG3-RFI-CO-S-1584 00 KAIG3-RFI-CO-S-1584-00
KAIG3-RFI-CO-S-1583 00 KAIG3-RFI-CO-S-1583-00
KAIG3-RFI-SW-S-1465 00 KAIG3-RFI-SW-S-1465-00
KAIG3-RFI-TB-E-0108 00 KAIG3-RFI-TB-E-0108-00
KAIG3-RFI-TB-E-0107 00 KAIG3-RFI-TB-E-0107-00
KAIG3-RFI-TB-LC-0109 00 KAIG3-RFI-TB-LC-0109-00
KAIG3-RFI-TB-LC-0108 00 KAIG3-RFI-TB-LC-0108-00
KAIG3-RFI-TB-LC-0107 00 KAIG3-RFI-TB-LC-0107-00
KAIG3-RFI-SW-LS-0157 00 KAIG3-RFI-SW-LS-0157-00
KAIG3-RFI-SW-LS-0111 01 KAIG3-RFI-SW-LS-0111-01
KAIG3-RFI-SW-S-1482 01 KAIG3-RFI-SW-S-1482-01
KAIG3-RFI-TB-E-0106 00 KAIG3-RFI-TB-E-0106-00
KAIG3-RFI-SW-LS-0156 00 KAIG3-RFI-SW-LS-0156-00
KAIG3-RFI-SW-LS-0158 00 KAIG3-RFI-SW-LS-0158-00
KAIG3-RFI-SW-LS-0160 00 KAIG3-RFI-SW-LS-0160-00
KAIG3-RFI-SW-LS-0159 00 KAIG3-RFI-SW-LS-0159-00
KAIG3-RFI-SW-A-0292 00 KAIG3-RFI-SW-A-0292-00
KAIG3-RFI-SW-A-0294 00 KAIG3-RFI-SW-A-0294-00
KAIG3-RFI-SW-A-0293 00 KAIG3-RFI-SW-A-0293-00
KAIG3-RFI-TB-LC-0106 00 KAIG3-RFI-TB-LC-0106-00
KAIG3-RFI-TB-LC-0105 00 KAIG3-RFI-TB-LC-0105-00
KAIG3-RFI-TB-LC-0104 00 KAIG3-RFI-TB-LC-0104-00
KAIG3-RFI-BO-LC-0103 00 KAIG3-RFI-BO-LC-0103-00
KAIG3-RFI-TB-E-0105 00 KAIG3-RFI-TB-E-0105-00
KAIG3-RFI-TB-E-0104 00 KAIG3-RFI-TB-E-0104-00
KAIG3-RFI-BO-E-0103 00 KAIG3-RFI-BO-E-0103-00
KAIG3-RFI-CO-S-1573 00 KAIG3-RFI-CO-S-1573-00
KAIG3-RFI-CO-S-1572 00 KAIG3-RFI-CO-S-1572-00
KAIG3-RFI-CO-S-1571 00 KAIG3-RFI-CO-S-1571-00
KAIG3-RFI-CO-S-1570 00 KAIG3-RFI-CO-S-1570-00
KAIG3-RFI-CO-S-1569 00 KAIG3-RFI-CO-S-1569-00
KAIG3-RFI-CO-S-1568 00 KAIG3-RFI-CO-S-1568-00
KAIG3-RFI-CO-S-1567 00 KAIG3-RFI-CO-S-1567-00
KAIG3-RFI-TB-S-0182 00 KAIG3-RFI-TB-S-0182-00
KAIG3-RFI-WG-SU-1045 00 KAIG3-RFI-WG-SU-1045-00
KAIG3-RFI-SW-SU-1044 00 KAIG3-RFI-SW-SU-1044-00
KAIG3-RFI-MB-LC-0084 01 KAIG3-RFI-MB-LC-0084-01
KAIG3-RFI-SW-SU-1041 00 KAIG3-RFI-SW-SU-1041-00
KAIG3-RFI-SW-SU-1040 00 KAIG3-RFI-SW-SU-1040-00
KAIG3-RFI-SW-SU-1042 00 KAIG3-RFI-SW-SU-1042-00
KAIG3-RFI-SW-SU-1039 00 KAIG3-RFI-SW-SU-1039-00
KAIG3-RFI-PA-S-1566 00 KAIG3-RFI-PA-S-1566-00
KAIG3-RFI-SW-LS-0152 00 KAIG3-RFI-SW-LS-0152-00
KAIG3-RFI-SW-LS-0154 00 KAIG3-RFI-SW-LS-0154-00
KAIG3-RFI-WG-LS-0155 00 KAIG3-RFI-WG-LS-0155-00
KAIG3-RFI-MB-A-0291 00 KAIG3-RFI-MB-A-0291-00
KAIG3-RFI-SW-LS-0151 00 KAIG3-RFI-SW-LS-0151-00
KAIG3-RFI-SW-LS-0150 00 KAIG3-RFI-SW-LS-0150-00
KAIG3-RFI-TB-E-0102 00 KAIG3-RFI-TB-E-0102-00
KAIG3-RFI-TB-LC-0102 00 KAIG3-RFI-TB-LC-0102-00
KAIG3-RFI-TB-LC-0101 00 KAIG3-RFI-TB-LC-0101-00
KAIG3-RFI-TB-LC-0100 00 KAIG3-RFI-TB-LC-0100-00
KAIG3-RFI-SW-S-1565 00 KAIG3-RFI-SW-S-1565-00
KAIG3-RFI-SW-LS-0145 00 KAIG3-RFI-SW-LS-0145-00
KAIG3-RFI-SW-LS-0146 00 KAIG3-RFI-SW-LS-0146-00
KAIG3-RFI-SW-LS-0147 00 KAIG3-RFI-SW-LS-0147-00
KAIG3-RFI-SW-LS-0148 00 KAIG3-RFI-SW-LS-0148-00
KAIG3-RFI-SW-LS-0149 00 KAIG3-RFI-SW-LS-0149-00
KAIG3-RFI-WG-SU-1037 00 KAIG3-RFI-WG-SU-1037-00
KAIG3-RFI-EC-GE-0450 00 KAIG3-RFI-EC-GE-0450-00
KAIG3-RFI-SW-S-1564 00 KAIG3-RFI-SW-S-1564-00
KAIG3-RFI-SW-S-1563 00 KAIG3-RFI-SW-S-1563-00
KAIG3-RFI-EC-SU-1038 00 KAIG3-RFI-EC-SU-1038-00
KAIG3-RFI-SW-S-1562 00 KAIG3-RFI-SW-S-1562-00
KAIG3-RFI-SW-S-1561 00 KAIG3-RFI-SW-S-1561-00
KAIG3-RFI-SW-S-1560 00 KAIG3-RFI-SW-S-1560-00
KAIG3-RFI-TB-LC-0099 00 KAIG3-RFI-TB-LC-0099-00
KAIG3-RFI-SW-P-0045 00 KAIG3-RFI-SW-P-0045-00
KAIG3-RFI-SW-S-1551 00 KAIG3-RFI-SW-S-1551-00
KAIG3-RFI-PA-S-1552 00 KAIG3-RFI-PA-S-1552-00
KAIG3-RFI-PA-S-1553 00 KAIG3-RFI-PA-S-1553-00
KAIG3-RFI-PA-S-1554 00 KAIG3-RFI-PA-S-1554-00
KAIG3-RFI-PA-S-1555 00 KAIG3-RFI-PA-S-1555-00
KAIG3-RFI-TB-S-1556 00 KAIG3-RFI-TB-S-1556-00
KAIG3-RFI-DG-A-0289 00 KAIG3-RFI-DG-A-0289-00
KAIG3-RFI-MB-A-0290 00 KAIG3-RFI-MB-A-0290-00
KAIG3-RFI-MB-A-0288 00 KAIG3-RFI-MB-A-0288-00
KAIG3-RFI-MB-S-1557 00 KAIG3-RFI-MB-S-1557-00
KAIG3-RFI-MB-A-0287 00 KAIG3-RFI-MB-A-0287-00
KAIG3-RFI-SM-S-1559 00 KAIG3-RFI-SM-S-1559-00
KAIG3-RFI-SM-S-1558 00 KAIG3-RFI-SM-S-1558-00
KAIG3-RFI-SM-SU-1036 00 KAIG3-RFI-SM-SU-1036-00
KAIG3-RFI-GN-LS-0063 03 KAIG3-RFI-GN-LS-0063-03
KAIG3-RFI-WG-LS-0129 01 KAIG3-RFI-WG-LS-0129-01
KAIG3-RFI-SW-S-1494 01 KAIG3-RFI-SW-S-1494-01
KAIG3-RFI-SW-LS-0108 01 KAIG3-RFI-SW-LS-0108-01
KAIG3-RFI-PA-S-1493 01 KAIG3-RFI-PA-S-1493-01
KAIG3-RFI-GN-LS-0067 03 KAIG3-RFI-GN-LS-0067-03
KAIG3-RFI-BO-LC-0098 00 KAIG3-RFI-BO-LC-0098-00
KAIG3-RFI-BO-E-0101 00 KAIG3-RFI-BO-E-0101-00
KAIG3-RFI-SW-SU-1030 00 KAIG3-RFI-SW-SU-1030-00
KAIG3-RFI-TG-SU-1031 00 KAIG3-RFI-TG-SU-1031-00
KAIG3-RFI-SW-SU-1032 00 KAIG3-RFI-SW-SU-1032-00
KAIG3-RFI-SW-SU-1029 00 KAIG3-RFI-SW-SU-1029-00
KAIG3-RFI-PA-S-1549 00 KAIG3-RFI-PA-S-1549-00
KAIG3-RFI-PA-S-1550 00 KAIG3-RFI-PA-S-1550-00
KAIG3-RFI-PA-S-1548 00 KAIG3-RFI-PA-S-1548-00
KAIG3-RFI-SW-S-1543 00 KAIG3-RFI-SW-S-1543-00
KAIG3-RFI-SW-S-1541 00 KAIG3-RFI-SW-S-1541-00
KAIG3-RFI-SW-S-1542 00 KAIG3-RFI-SW-S-1542-00
KAIG3-RFI-SW-LS-0143 00 KAIG3-RFI-SW-LS-0143-00
KAIG3-RFI-SW-LS-0142 00 KAIG3-RFI-SW-LS-0142-00
KAIG3-RFI-SW-S-1529 00 KAIG3-RFI-SW-S-1529-00
KAIG3-RFI-SW-S-1530 00 KAIG3-RFI-SW-S-1530-00
KAIG3-RFI-SW-S-1535 00 KAIG3-RFI-SW-S-1535-00
KAIG3-RFI-SW-S-1536 00 KAIG3-RFI-SW-S-1536-00
KAIG3-RFI-TB-S-1537 00 KAIG3-RFI-TB-S-1537-00
KAIG3-RFI-SW-A-0285 00 KAIG3-RFI-SW-A-0285-00
KAIG3-RFI-PA-S-1538 00 KAIG3-RFI-PA-S-1538-00
KAIG3-RFI-CO-S-1547 00 KAIG3-RFI-CO-S-1547-00
KAIG3-RFI-CO-S-1546 00 KAIG3-RFI-CO-S-1546-00
KAIG3-RFI-CO-S-1545 00 KAIG3-RFI-CO-S-1545-00
KAIG3-RFI-CO-S-1544 00 KAIG3-RFI-CO-S-1544-00
KAIG3-RFI-CO-SU-1035 00 KAIG3-RFI-CO-SU-1035-00
KAIG3-RFI-CO-SU-1034 00 KAIG3-RFI-CO-SU-1034-00
KAIG3-RFI-CO-SU-1033 00 KAIG3-RFI-CO-SU-1033-00
KAIG3-RFI-PA-S-1539 00 KAIG3-RFI-PA-S-1539-00
KAIG3-RFI-SG-SU-0978 01 KAIG3-RFI-SG-SU-0978-01
KAIG3-RFI-SW-LS-0110 01 KAIG3-RFI-SW-LS-0110-01
KAIG3-RFI-TB-SU-1028 00 KAIG3-RFI-TB-SU-1028-00
KAIG3-RFI-TB-SU-1027 00 KAIG3-RFI-TB-SU-1027-00
KAIG3-RFI-SW-S-1528 00 KAIG3-RFI-SW-S-1528-00
KAIG3-RFI-PA-S-1540 00 KAIG3-RFI-PA-S-1540-00
KAIG3-RFI-EC-GE-0449 00 KAIG3-RFI-EC-GE-0449-00
KAIG3-RFI-EC-SU-1020 00 KAIG3-RFI-EC-SU-1020-00
KAIG3-RFI-CO-S-1534 00 KAIG3-RFI-CO-S-1534-00
KAIG3-RFI-CO-S-1533 00 KAIG3-RFI-CO-S-1533-00
KAIG3-RFI-CO-S-1532 00 KAIG3-RFI-CO-S-1532-00
KAIG3-RFI-CO-S-1531 00 KAIG3-RFI-CO-S-1531-00
KAIG3-RFI-CO-SU-1026 00 KAIG3-RFI-CO-SU-1026-00
KAIG3-RFI-CO-SU-1025 00 KAIG3-RFI-CO-SU-1025-00
KAIG3-RFI-ZG-E-0100 00 KAIG3-RFI-ZG-E-0100-00
KAIG3-RFI-MB-LC-0023 03 KAIG3-RFI-MB-LC-0023-03
KAIG3-RFI-PA-S-1464 00 KAIG3-RFI-PA-S-1464-00
KAIG3-RFI-CO-SU-1024 00 KAIG3-RFI-CO-SU-1024-00
KAIG3-RFI-SM-SU-1023 00 KAIG3-RFI-SM-SU-1023-00
KAIG3-RFI-SM-SU-1022 00 KAIG3-RFI-SM-SU-1022-00
KAIG3-RFI-PA-S-1492 01 KAIG3-RFI-PA-S-1492-01
KAIG3-RFI-GN-LS-0076 02 KAIG3-RFI-GN-LS-0076-02
KAIG3-RFI-SW-S-1525 00 KAIG3-RFI-SW-S-1525-00
KAIG3-RFI-ZG-S-1527 00 KAIG3-RFI-ZG-S-1527-00
KAIG3-RFI-SW-S-1524 00 KAIG3-RFI-SW-S-1524-00
KAIG3-RFI-SW-S-1522 00 KAIG3-RFI-SW-S-1522-00
KAIG3-RFI-SW-S-1523 00 KAIG3-RFI-SW-S-1523-00
KAIG3-RFI-SW-SU-1021 00 KAIG3-RFI-SW-SU-1021-00
KAIG3-RFI-SW-S-1526 00 KAIG3-RFI-SW-S-1526-00
KAIG3-RFI-SW-LS-0139 00 KAIG3-RFI-SW-LS-0139-00
KAIG3-RFI-SW-LS-0140 00 KAIG3-RFI-SW-LS-0140-00
KAIG3-RFI-EC-GE-0436 00 KAIG3-RFI-EC-GE-0436-00
KAIG3-RFI-EC-GE-0435 00 KAIG3-RFI-EC-GE-0435-00
KAIG3-RFI-CO-S-1379 00 KAIG3-RFI-CO-S-1379-00
KAIG3-RFI-SW-LS-0125 01 KAIG3-RFI-SW-LS-0125-01
KAIG3-RFI-SW-LS-0120 01 KAIG3-RFI-SW-LS-0120-01
KAIG3-RFI-SW-A-0284 00 KAIG3-RFI-SW-A-0284-00
KAIG3-RFI-SW-A-0283 00 KAIG3-RFI-SW-A-0283-00
KAIG3-RFI-SW-A-0282 00 KAIG3-RFI-SW-A-0282-00
KAIG3-RFI-WG-SU-1019 00 KAIG3-RFI-WG-SU-1019-00
KAIG3-RFI-SW-S-1333 02 KAIG3-RFI-SW-S-1333-02
KAIG3-RFI-SW-LS-0136 00 KAIG3-RFI-SW-LS-0136-00
KAIG3-RFI-EC-GE-0448 00 KAIG3-RFI-EC-GE-0448-00
KAIG3-RFI-SW-LS-0137 00 KAIG3-RFI-SW-LS-0137-00
KAIG3-RFI-SW-A-0281 00 KAIG3-RFI-SW-A-0281-00
KAIG3-RFI-SW-S-1459 00 KAIG3-RFI-SW-S-1459-00
KAIG3-RFI-TB-S-1514 00 KAIG3-RFI-TB-S-1514-00
KAIG3-RFI-TB-S-1516 00 KAIG3-RFI-TB-S-1516-00
KAIG3-RFI-CO-S-1521 00 KAIG3-RFI-CO-S-1521-00
KAIG3-RFI-CO-S-1520 00 KAIG3-RFI-CO-S-1520-00
KAIG3-RFI-CO-S-1519 00 KAIG3-RFI-CO-S-1519-00
KAIG3-RFI-CO-S-1518 00 KAIG3-RFI-CO-S-1518-00
KAIG3-RFI-CO-S-1517 00 KAIG3-RFI-CO-S-1517-00
KAIG3-RFI-AG-SU-0946 01 KAIG3-RFI-AG-SU-0946-01
KAIG3-RFI-AG-SU-0953 01 KAIG3-RFI-AG-SU-0953-01
KAIG3-RFI-GN-LS-0080 03 KAIG3-RFI-GN-LS-0080-03
KAIG3-RFI-SW-LS-0115 01 KAIG3-RFI-SW-LS-0115-01
KAIG3-RFI-SW-LS-0119 01 KAIG3-RFI-SW-LS-0119-01
KAIG3-RFI-SW-S-1457 01 KAIG3-RFI-SW-S-1457-01
KAIG3-RFI-TB-SU-0972 01 KAIG3-RFI-TB-SU-0972-01
KAIG3-RFI-SW-LS-0135 00 KAIG3-RFI-SW-LS-0135-00
KAIG3-RFI-SW-S-1515 00 KAIG3-RFI-SW-S-1515-00
KAIG3-RFI-SW-S-1512 00 KAIG3-RFI-SW-S-1512-00
KAIG3-RFI-SW-S-1513 00 KAIG3-RFI-SW-S-1513-00
KAIG3-RFI-PA-S-1509 00 KAIG3-RFI-PA-S-1509-00
KAIG3-RFI-PA-S-1510 00 KAIG3-RFI-PA-S-1510-00
KAIG3-RFI-PA-S-1511 00 KAIG3-RFI-PA-S-1511-00
KAIG3-RFI-SW-S-1494 00 KAIG3-RFI-SW-S-1494-00
KAIG3-RFI-PA-S-1499 00 KAIG3-RFI-PA-S-1499-00
KAIG3-RFI-PA-S-1500 00 KAIG3-RFI-PA-S-1500-00
KAIG3-RFI-PA-S-1501 00 KAIG3-RFI-PA-S-1501-00
KAIG3-RFI-SW-LS-0132 00 KAIG3-RFI-SW-LS-0132-00
KAIG3-RFI-CO-S-1508 00 KAIG3-RFI-CO-S-1508-00
KAIG3-RFI-CO-S-1507 00 KAIG3-RFI-CO-S-1507-00
KAIG3-RFI-CO-S-1506 00 KAIG3-RFI-CO-S-1506-00
KAIG3-RFI-CO-S-1505 00 KAIG3-RFI-CO-S-1505-00
KAIG3-RFI-SW-S-1496 00 KAIG3-RFI-SW-S-1496-00
KAIG3-RFI-CO-S-1504 00 KAIG3-RFI-CO-S-1504-00
KAIG3-RFI-WG-SU-1018 00 KAIG3-RFI-WG-SU-1018-00
KAIG3-RFI-WG-S-1498 00 KAIG3-RFI-WG-S-1498-00
KAIG3-RFI-CO-S-1503 00 KAIG3-RFI-CO-S-1503-00
KAIG3-RFI-SW-S-1497 00 KAIG3-RFI-SW-S-1497-00
KAIG3-RFI-CO-S-1502 00 KAIG3-RFI-CO-S-1502-00
KAIG3-RFI-CO-SU-1017 00 KAIG3-RFI-CO-SU-1017-00
KAIG3-RFI-TG-SU-1012 00 KAIG3-RFI-TG-SU-1012-00
KAIG3-RFI-WG-SU-1013 00 KAIG3-RFI-WG-SU-1013-00
KAIG3-RFI-CO-SU-1016 00 KAIG3-RFI-CO-SU-1016-00
KAIG3-RFI-SW-S-1495 00 KAIG3-RFI-SW-S-1495-00
KAIG3-RFI-CO-SU-1015 00 KAIG3-RFI-CO-SU-1015-00
KAIG3-RFI-SW-SU-1014 00 KAIG3-RFI-SW-SU-1014-00
KAIG3-RFI-EC-SU-1011 00 KAIG3-RFI-EC-SU-1011-00
KAIG3-RFI-PA-S-1492 00 KAIG3-RFI-PA-S-1492-00
KAIG3-RFI-SW-LS-0131 00 KAIG3-RFI-SW-LS-0131-00
KAIG3-RFI-AG-SU-0976 01 KAIG3-RFI-AG-SU-0976-01
KAIG3-RFI-SW-LS-0130 00 KAIG3-RFI-SW-LS-0130-00
KAIG3-RFI-PA-S-1493 00 KAIG3-RFI-PA-S-1493-00
KAIG3-RFI-SW-S-1483 00 KAIG3-RFI-SW-S-1483-00
KAIG3-RFI-MB-A-0249 01 KAIG3-RFI-MB-A-0249-01
KAIG3-RFI-MB-S-1490 00 KAIG3-RFI-MB-S-1490-00
KAIG3-RFI-MB-A-0280 00 KAIG3-RFI-MB-A-0280-00
KAIG3-RFI-MB-A-0279 00 KAIG3-RFI-MB-A-0279-00
KAIG3-RFI-MB-S-1491 00 KAIG3-RFI-MB-S-1491-00
KAIG3-RFI-MB-SU-1010 00 KAIG3-RFI-MB-SU-1010-00
KAIG3-RFI-SW-SU-1008 00 KAIG3-RFI-SW-SU-1008-00
KAIG3-RFI-SW-SU-1009 00 KAIG3-RFI-SW-SU-1009-00
KAIG3-RFI-SW-SU-1004 00 KAIG3-RFI-SW-SU-1004-00
KAIG3-RFI-SW-SU-1003 00 KAIG3-RFI-SW-SU-1003-00
KAIG3-RFI-SW-S-1482 00 KAIG3-RFI-SW-S-1482-00
KAIG3-RFI-PA-S-1487 00 KAIG3-RFI-PA-S-1487-00
KAIG3-RFI-PA-S-1488 00 KAIG3-RFI-PA-S-1488-00
KAIG3-RFI-PA-S-1489 00 KAIG3-RFI-PA-S-1489-00
KAIG3-RFI-PA-S-1484 00 KAIG3-RFI-PA-S-1484-00
KAIG3-RFI-PA-S-1485 00 KAIG3-RFI-PA-S-1485-00
KAIG3-RFI-PA-S-1486 00 KAIG3-RFI-PA-S-1486-00
KAIG3-RFI-MB-A-0278 00 KAIG3-RFI-MB-A-0278-00
KAIG3-RFI-WG-SU-1001 00 KAIG3-RFI-WG-SU-1001-00
KAIG3-RFI-WG-SU-1002 00 KAIG3-RFI-WG-SU-1002-00
KAIG3-RFI-WG-LS-0129 00 KAIG3-RFI-WG-LS-0129-00
KAIG3-RFI-WG-SU-1005 00 KAIG3-RFI-WG-SU-1005-00
KAIG3-RFI-EC-GE-0447 00 KAIG3-RFI-EC-GE-0447-00
KAIG3-RFI-EC-GE-0446 00 KAIG3-RFI-EC-GE-0446-00
KAIG3-RFI-EC-GE-0445 00 KAIG3-RFI-EC-GE-0445-00
KAIG3-RFI-ZG-SU-0954 01 KAIG3-RFI-ZG-SU-0954-01
KAIG3-RFI-SM-SU-1007 00 KAIG3-RFI-SM-SU-1007-00
KAIG3-RFI-SM-SU-1006 00 KAIG3-RFI-SM-SU-1006-00
KAIG3-RFI-SW-LS-0129 00 KAIG3-RFI-SW-LS-0129-00
KAIG3-RFI-BO-SU-0997 00 KAIG3-RFI-BO-SU-0997-00
KAIG3-RFI-PA-S-1463 00 KAIG3-RFI-PA-S-1463-00
KAIG3-RFI-SW-S-1473 00 KAIG3-RFI-SW-S-1473-00
KAIG3-RFI-SW-SU-0996 00 KAIG3-RFI-SW-SU-0996-00
KAIG3-RFI-SW-LS-0127 00 KAIG3-RFI-SW-LS-0127-00
KAIG3-RFI-SW-LS-0128 00 KAIG3-RFI-SW-LS-0128-00
KAIG3-RFI-SW-S-1478 00 KAIG3-RFI-SW-S-1478-00
KAIG3-RFI-TB-S-1477 00 KAIG3-RFI-TB-S-1477-00
KAIG3-RFI-TB-S-1474 00 KAIG3-RFI-TB-S-1474-00
KAIG3-RFI-TB-S-1475 00 KAIG3-RFI-TB-S-1475-00
KAIG3-RFI-TB-S-1476 00 KAIG3-RFI-TB-S-1476-00
KAIG3-RFI-SW-S-1480 00 KAIG3-RFI-SW-S-1480-00
KAIG3-RFI-SW-S-1479 00 KAIG3-RFI-SW-S-1479-00
KAIG3-RFI-SW-S-1460 00 KAIG3-RFI-SW-S-1460-00
KAIG3-RFI-SW-S-1461 00 KAIG3-RFI-SW-S-1461-00
KAIG3-RFI-SW-S-1462 00 KAIG3-RFI-SW-S-1462-00
KAIG3-RFI-SW-SU-0995 00 KAIG3-RFI-SW-SU-0995-00
KAIG3-RFI-SW-S-1458 00 KAIG3-RFI-SW-S-1458-00
KAIG3-RFI-EC-SU-1000 00 KAIG3-RFI-EC-SU-1000-00
KAIG3-RFI-EC-SU-0999 00 KAIG3-RFI-EC-SU-0999-00
KAIG3-RFI-EC-SU-0998 00 KAIG3-RFI-EC-SU-0998-00
KAIG3-RFI-CO-S-1472 00 KAIG3-RFI-CO-S-1472-00
KAIG3-RFI-CO-S-1471 00 KAIG3-RFI-CO-S-1471-00
KAIG3-RFI-CO-S-1470 00 KAIG3-RFI-CO-S-1470-00
KAIG3-RFI-CO-S-1469 00 KAIG3-RFI-CO-S-1469-00
KAIG3-RFI-CO-S-1468 00 KAIG3-RFI-CO-S-1468-00
KAIG3-RFI-CO-S-1467 00 KAIG3-RFI-CO-S-1467-00
KAIG3-RFI-CO-S-1466 00 KAIG3-RFI-CO-S-1466-00
KAIG3-RFI-BO-E-0099 00 KAIG3-RFI-BO-E-0099-00
KAIG3-RFI-BO-E-0098 00 KAIG3-RFI-BO-E-0098-00
KAIG3-RFI-BO-LC-0097 00 KAIG3-RFI-BO-LC-0097-00
KAIG3-RFI-BO-LC-0096 00 KAIG3-RFI-BO-LC-0096-00
KAIG3-RFI-MB-P-0043 00 KAIG3-RFI-MB-P-0043-00
KAIG3-RFI-SW-SU-0989 00 KAIG3-RFI-SW-SU-0989-00
KAIG3-RFI-SW-S-1448 00 KAIG3-RFI-SW-S-1448-00
KAIG3-RFI-TB-S-1449 00 KAIG3-RFI-TB-S-1449-00
KAIG3-RFI-SW-S-1447 00 KAIG3-RFI-SW-S-1447-00
KAIG3-RFI-SW-SU-0991 00 KAIG3-RFI-SW-SU-0991-00
KAIG3-RFI-TB-S-1450 00 KAIG3-RFI-TB-S-1450-00
KAIG3-RFI-SW-S-1456 00 KAIG3-RFI-SW-S-1456-00
KAIG3-RFI-SW-S-1455 00 KAIG3-RFI-SW-S-1455-00
KAIG3-RFI-SW-S-1454 00 KAIG3-RFI-SW-S-1454-00
KAIG3-RFI-SW-S-1453 00 KAIG3-RFI-SW-S-1453-00
KAIG3-RFI-SW-S-1452 00 KAIG3-RFI-SW-S-1452-00
KAIG3-RFI-SW-S-1451 00 KAIG3-RFI-SW-S-1451-00
KAIG3-RFI-WG-SU-0994 00 KAIG3-RFI-WG-SU-0994-00
KAIG3-RFI-SW-SU-0992 00 KAIG3-RFI-SW-SU-0992-00
KAIG3-RFI-SW-S-1446 00 KAIG3-RFI-SW-S-1446-00
KAIG3-RFI-SW-SU-0993 00 KAIG3-RFI-SW-SU-0993-00
KAIG3-RFI-SW-SU-0987 00 KAIG3-RFI-SW-SU-0987-00
KAIG3-RFI-SW-SU-0990 00 KAIG3-RFI-SW-SU-0990-00
KAIG3-RFI-SW-SU-0988 00 KAIG3-RFI-SW-SU-0988-00
KAIG3-RFI-SW-S-1457 00 KAIG3-RFI-SW-S-1457-00
KAIG3-RFI-EC-GE-0444 00 KAIG3-RFI-EC-GE-0444-00
KAIG3-RFI-EC-SU-0984 00 KAIG3-RFI-EC-SU-0984-00
KAIG3-RFI-BG-SU-0867 03 KAIG3-RFI-BG-SU-0867-03
KAIG3-RFI-TB-S-1414 00 KAIG3-RFI-TB-S-1414-00
KAIG3-RFI-GN-LS-0072 03 KAIG3-RFI-GN-LS-0072-03
KAIG3-RFI-SW-S-1333 01 KAIG3-RFI-SW-S-1333-01
KAIG3-RFI-BO-LC-0095 00 KAIG3-RFI-BO-LC-0095-00
KAIG3-RFI-BO-E-0097 00 KAIG3-RFI-BO-E-0097-00
KAIG3-RFI-TB-SU-0982 00 KAIG3-RFI-TB-SU-0982-00
KAIG3-RFI-TB-SU-0981 00 KAIG3-RFI-TB-SU-0981-00
KAIG3-RFI-TB-SU-0980 00 KAIG3-RFI-TB-SU-0980-00
KAIG3-RFI-SW-A-0277 00 KAIG3-RFI-SW-A-0277-00
KAIG3-RFI-SW-A-0276 00 KAIG3-RFI-SW-A-0276-00
KAIG3-RFI-SW-A-0275 00 KAIG3-RFI-SW-A-0275-00
KAIG3-RFI-SW-S-1445 00 KAIG3-RFI-SW-S-1445-00
KAIG3-RFI-SW-S-1444 00 KAIG3-RFI-SW-S-1444-00
KAIG3-RFI-SW-S-1443 00 KAIG3-RFI-SW-S-1443-00
KAIG3-RFI-SW-S-1442 00 KAIG3-RFI-SW-S-1442-00
KAIG3-RFI-AG-SU-0976 00 KAIG3-RFI-AG-SU-0976-00
KAIG3-RFI-TB-SU-0985 00 KAIG3-RFI-TB-SU-0985-00
KAIG3-RFI-SW-SU-0986 00 KAIG3-RFI-SW-SU-0986-00
KAIG3-RFI-MB-S-1439 00 KAIG3-RFI-MB-S-1439-00
KAIG3-RFI-SW-LS-0126 00 KAIG3-RFI-SW-LS-0126-00
KAIG3-RFI-TB-E-0078 01 KAIG3-RFI-TB-E-0078-01
KAIG3-RFI-BO-E-0096 00 KAIG3-RFI-BO-E-0096-00
KAIG3-RFI-BO-LC-0094 00 KAIG3-RFI-BO-LC-0094-00
KAIG3-RFI-EC-GE-0442 00 KAIG3-RFI-EC-GE-0442-00
KAIG3-RFI-EC-SU-0983 00 KAIG3-RFI-EC-SU-0983-00
KAIG3-RFI-EC-SU-0975 00 KAIG3-RFI-EC-SU-0975-00
KAIG3-RFI-SW-A-0265 01 KAIG3-RFI-SW-A-0265-01
KAIG3-RFI-SW-A-0266 01 KAIG3-RFI-SW-A-0266-01
KAIG3-RFI-SW-A-0267 01 KAIG3-RFI-SW-A-0267-01
KAIG3-RFI-SW-A-0268 01 KAIG3-RFI-SW-A-0268-01
KAIG3-RFI-SW-LS-0125 00 KAIG3-RFI-SW-LS-0125-00
KAIG3-RFI-SW-S-1441 00 KAIG3-RFI-SW-S-1441-00
KAIG3-RFI-SW-S-1440 00 KAIG3-RFI-SW-S-1440-00
KAIG3-RFI-TB-S-1398 00 KAIG3-RFI-TB-S-1398-00
KAIG3-RFI-TB-S-1397 00 KAIG3-RFI-TB-S-1397-00
KAIG3-RFI-TB-S-1396 00 KAIG3-RFI-TB-S-1396-00
KAIG3-RFI-TB-S-1395 00 KAIG3-RFI-TB-S-1395-00
KAIG3-RFI-TB-S-1394 00 KAIG3-RFI-TB-S-1394-00
KAIG3-RFI-SW-A-0272 00 KAIG3-RFI-SW-A-0272-00
KAIG3-RFI-SW-A-0273-00 00 KAIG3-RFI-SW-A-0273-00-00
KAIG3-RFI-SW-A-0274 00 KAIG3-RFI-SW-A-0274-00
KAIG3-RFI-SW-S-1433 00 KAIG3-RFI-SW-S-1433-00
KAIG3-RFI-SW-S-1434 00 KAIG3-RFI-SW-S-1434-00
KAIG3-RFI-SW-S-1432 00 KAIG3-RFI-SW-S-1432-00
KAIG3-RFI-MB-SU-0979 00 KAIG3-RFI-MB-SU-0979-00
KAIG3-RFI-MB-S-1438 00 KAIG3-RFI-MB-S-1438-00
KAIG3-RFI-TB-S-1436 00 KAIG3-RFI-TB-S-1436-00
KAIG3-RFI-SW-S-1420 00 KAIG3-RFI-SW-S-1420-00
KAIG3-RFI-ZG-SU-0954 00 KAIG3-RFI-ZG-SU-0954-00
KAIG3-RFI-SG-SU-0978 00 KAIG3-RFI-SG-SU-0978-00
KAIG3-RFI-WG-SU-0977 00 KAIG3-RFI-WG-SU-0977-00
KAIG3-RFI-MB-S-1400 00 KAIG3-RFI-MB-S-1400-00
KAIG3-RFI-PA-S-1437 00 KAIG3-RFI-PA-S-1437-00
KAIG3-RFI-SW-LS-0124 00 KAIG3-RFI-SW-LS-0124-00
KAIG3-RFI-EC-GE-0441 00 KAIG3-RFI-EC-GE-0441-00
KAIG3-RFI-EC-SU-0974 00 KAIG3-RFI-EC-SU-0974-00
KAIG3-RFI-CO-S-1431 00 KAIG3-RFI-CO-S-1431-00
KAIG3-RFI-CO-S-1430 00 KAIG3-RFI-CO-S-1430-00
KAIG3-RFI-CO-S-1429 00 KAIG3-RFI-CO-S-1429-00
KAIG3-RFI-CO-S-1428 00 KAIG3-RFI-CO-S-1428-00
KAIG3-RFI-CO-S-1427 00 KAIG3-RFI-CO-S-1427-00
KAIG3-RFI-CO-S-1426 00 KAIG3-RFI-CO-S-1426-00
KAIG3-RFI-CO-S-1425 00 KAIG3-RFI-CO-S-1425-00
KAIG3-RFI-CO-S-1424 00 KAIG3-RFI-CO-S-1424-00
KAIG3-RFI-CO-S-1423 00 KAIG3-RFI-CO-S-1423-00
KAIG3-RFI-CO-SU-0973 00 KAIG3-RFI-CO-SU-0973-00
KAIG3-RFI-TB-SU-0972 00 KAIG3-RFI-TB-SU-0972-00
KAIG3-RFI-TB-SU-0971 00 KAIG3-RFI-TB-SU-0971-00
KAIG3-RFI-SW-SU-0970 00 KAIG3-RFI-SW-SU-0970-00
KAIG3-RFI-SW-SU-0969 00 KAIG3-RFI-SW-SU-0969-00
KAIG3-RFI-SW-S-1422 00 KAIG3-RFI-SW-S-1422-00
KAIG3-RFI-SW-S-1421 00 KAIG3-RFI-SW-S-1421-00
KAIG3-RFI-SW-S-1419 00 KAIG3-RFI-SW-S-1419-00
KAIG3-RFI-SW-SU-0968 00 KAIG3-RFI-SW-SU-0968-00
KAIG3-RFI-PA-S-1418 00 KAIG3-RFI-PA-S-1418-00
KAIG3-RFI-SW-LS-0123 00 KAIG3-RFI-SW-LS-0123-00
KAIG3-RFI-SW-LS-0122 00 KAIG3-RFI-SW-LS-0122-00
KAIG3-RFI-SW-LS-0121 00 KAIG3-RFI-SW-LS-0121-00
KAIG3-RFI-CO-S-1417 00 KAIG3-RFI-CO-S-1417-00
KAIG3-RFI-CO-SU-0967 00 KAIG3-RFI-CO-SU-0967-00
KAIG3-RFI-PA-S-1409 00 KAIG3-RFI-PA-S-1409-00
KAIG3-RFI-SM-SU-0966 00 KAIG3-RFI-SM-SU-0966-00
KAIG3-RFI-SW-LS-0120 00 KAIG3-RFI-SW-LS-0120-00
KAIG3-RFI-PA-S-1410 00 KAIG3-RFI-PA-S-1410-00
KAIG3-RFI-PA-S-1411 00 KAIG3-RFI-PA-S-1411-00
KAIG3-RFI-SW-S-1415 00 KAIG3-RFI-SW-S-1415-00
KAIG3-RFI-FC-S-1412 00 KAIG3-RFI-FC-S-1412-00
KAIG3-RFI-FC-S-1413 00 KAIG3-RFI-FC-S-1413-00
KAIG3-RFI-MB-E-0095 00 KAIG3-RFI-MB-E-0095-00
KAIG3-RFI-SW-S-1384 00 KAIG3-RFI-SW-S-1384-00
KAIG3-RFI-MB-LC-0093 00 KAIG3-RFI-MB-LC-0093-00
KAIG3-RFI-SW-S-1385 00 KAIG3-RFI-SW-S-1385-00
KAIG3-RFI-SW-S-1386 00 KAIG3-RFI-SW-S-1386-00
KAIG3-RFI-SW-S-1387 00 KAIG3-RFI-SW-S-1387-00
KAIG3-RFI-SW-S-1388 00 KAIG3-RFI-SW-S-1388-00
KAIG3-RFI-SW-S-1389 00 KAIG3-RFI-SW-S-1389-00
KAIG3-RFI-MB-S-1399 00 KAIG3-RFI-MB-S-1399-00
KAIG3-RFI-SW-S-1338 00 KAIG3-RFI-SW-S-1338-00
KAIG3-RFI-MB-S-1392 00 KAIG3-RFI-MB-S-1392-00
KAIG3-RFI-MB-S-1416 00 KAIG3-RFI-MB-S-1416-00
KAIG3-RFI-MB-SU-0965 00 KAIG3-RFI-MB-SU-0965-00
KAIG3-RFI-SW-SU-1311 00 KAIG3-RFI-SW-SU-1311-00
KAIG3-RFI-MB-SU-0961 00 KAIG3-RFI-MB-SU-0961-00
KAIG3-RFI-MB-S-1402 00 KAIG3-RFI-MB-S-1402-00
KAIG3-RFI-MB-S-1401 00 KAIG3-RFI-MB-S-1401-00
KAIG3-RFI-WG-SU-0962 00 KAIG3-RFI-WG-SU-0962-00
KAIG3-RFI-PA-S-1408 00 KAIG3-RFI-PA-S-1408-00
KAIG3-RFI-PA-S-1407 00 KAIG3-RFI-PA-S-1407-00
KAIG3-RFI-PA-S-1406 00 KAIG3-RFI-PA-S-1406-00
KAIG3-RFI-PA-S-1405 00 KAIG3-RFI-PA-S-1405-00
KAIG3-RFI-SW-LS-0118 00 KAIG3-RFI-SW-LS-0118-00
KAIG3-RFI-SW-LS-0119 00 KAIG3-RFI-SW-LS-0119-00
KAIG3-RFI-SW-LS-0117 00 KAIG3-RFI-SW-LS-0117-00
KAIG3-RFI-SW-LS-0116 00 KAIG3-RFI-SW-LS-0116-00
KAIG3-RFI-CO-SU-0927 01 KAIG3-RFI-CO-SU-0927-01
KAIG3-RFI-CO-S-1404 00 KAIG3-RFI-CO-S-1404-00
KAIG3-RFI-CO-S-1403 00 KAIG3-RFI-CO-S-1403-00
KAIG3-RFI-CO-SU-0964 00 KAIG3-RFI-CO-SU-0964-00
KAIG3-RFI-CO-SU-0963 00 KAIG3-RFI-CO-SU-0963-00
KAIG3-RFI-CO-GE-0440 00 KAIG3-RFI-CO-GE-0440-00
KAIG3-RFI-MB-S-1391 00 KAIG3-RFI-MB-S-1391-00
KAIG3-RFI-ZG-S-1390 00 KAIG3-RFI-ZG-S-1390-00
KAIG3-RFI-MB-SU-0959 00 KAIG3-RFI-MB-SU-0959-00
KAIG3-RFI-MB-SU-0958 00 KAIG3-RFI-MB-SU-0958-00
KAIG3-RFI-WG-SU-0957 00 KAIG3-RFI-WG-SU-0957-00
KAIG3-RFI-AG-SU-0953 00 KAIG3-RFI-AG-SU-0953-00
KAIG3-RFI-TB-S-1376 00 KAIG3-RFI-TB-S-1376-00
KAIG3-RFI-MB-S-1375 00 KAIG3-RFI-MB-S-1375-00
KAIG3-RFI-SW-S-1393 00 KAIG3-RFI-SW-S-1393-00
KAIG3-RFI-SW-LS-0114 00 KAIG3-RFI-SW-LS-0114-00
KAIG3-RFI-SW-LS-0115 00 KAIG3-RFI-SW-LS-0115-00
KAIG3-RFI-SW-SU-0956 00 KAIG3-RFI-SW-SU-0956-00
KAIG3-RFI-SW-S-1353 00 KAIG3-RFI-SW-S-1353-00
KAIG3-RFI-FC-SU-0952 00 KAIG3-RFI-FC-SU-0952-00
KAIG3-RFI-SW-S-1197 00 KAIG3-RFI-SW-S-1197-00
KAIG3-RFI-SW-P-0043 00 KAIG3-RFI-SW-P-0043-00
KAIG3-RFI-SW-SU-0955 00 KAIG3-RFI-SW-SU-0955-00
KAIG3-RFI-EC-GE-0439 00 KAIG3-RFI-EC-GE-0439-00
KAIG3-RFI-EC-GE-0438 00 KAIG3-RFI-EC-GE-0438-00
KAIG3-RFI-EC-GE-0437 00 KAIG3-RFI-EC-GE-0437-00
KAIG3-RFI-CO-S-1383 00 KAIG3-RFI-CO-S-1383-00
KAIG3-RFI-CO-S-1382 00 KAIG3-RFI-CO-S-1382-00
KAIG3-RFI-CO-S-1381 00 KAIG3-RFI-CO-S-1381-00
KAIG3-RFI-CO-S-1380 00 KAIG3-RFI-CO-S-1380-00
KAIG3-RFI-CO-S-1378 00 KAIG3-RFI-CO-S-1378-00
KAIG3-RFI-CO-S-1377 00 KAIG3-RFI-CO-S-1377-00
KAIG3-RFI-SW-S-1335 00 KAIG3-RFI-SW-S-1335-00
KAIG3-RFI-TG-SU-0947 00 KAIG3-RFI-TG-SU-0947-00
KAIG3-RFI-MB-SU-0950 00 KAIG3-RFI-MB-SU-0950-00
KAIG3-RFI-SW-S-1372 00 KAIG3-RFI-SW-S-1372-00
KAIG3-RFI-MB-S-1374 00 KAIG3-RFI-MB-S-1374-00
KAIG3-RFI-SW-A-0269 00 KAIG3-RFI-SW-A-0269-00
KAIG3-RFI-SW-A-0270 00 KAIG3-RFI-SW-A-0270-00
KAIG3-RFI-SW-A-0271 00 KAIG3-RFI-SW-A-0271-00
KAIG3-RFI-MB-S-1365 00 KAIG3-RFI-MB-S-1365-00
KAIG3-RFI-MB-S-1359 00 KAIG3-RFI-MB-S-1359-00
KAIG3-RFI-SW-S-1373 00 KAIG3-RFI-SW-S-1373-00
KAIG3-RFI-SW-SU-0949 00 KAIG3-RFI-SW-SU-0949-00
KAIG3-RFI-SW-LS-0113 00 KAIG3-RFI-SW-LS-0113-00
KAIG3-RFI-EC-SU-0951 00 KAIG3-RFI-EC-SU-0951-00
KAIG3-RFI-GN-LS-0076 01 KAIG3-RFI-GN-LS-0076-01
KAIG3-RFI-SW-S-1369 00 KAIG3-RFI-SW-S-1369-00
KAIG3-RFI-PA-S-1371 00 KAIG3-RFI-PA-S-1371-00
KAIG3-RFI-SW-LS-0109 00 KAIG3-RFI-SW-LS-0109-00
KAIG3-RFI-SW-LS-0110 00 KAIG3-RFI-SW-LS-0110-00
KAIG3-RFI-SW-LS-0112 00 KAIG3-RFI-SW-LS-0112-00
KAIG3-RFI-SW-LS-0111 00 KAIG3-RFI-SW-LS-0111-00
KAIG3-RFI-SW-S-1368 00 KAIG3-RFI-SW-S-1368-00
KAIG3-RFI-SW-S-1370 00 KAIG3-RFI-SW-S-1370-00
KAIG3-RFI-SW-LS-0105 00 KAIG3-RFI-SW-LS-0105-00
KAIG3-RFI-SW-S-1367 00 KAIG3-RFI-SW-S-1367-00
KAIG3-RFI-MB-S-1364 00 KAIG3-RFI-MB-S-1364-00
KAIG3-RFI-SW-S-1366 00 KAIG3-RFI-SW-S-1366-00
KAIG3-RFI-SW-A-0268 00 KAIG3-RFI-SW-A-0268-00
KAIG3-RFI-MB-SU-0948 00 KAIG3-RFI-MB-SU-0948-00
KAIG3-RFI-SW-S-1363 00 KAIG3-RFI-SW-S-1363-00
KAIG3-RFI-AG-SU-0946 00 KAIG3-RFI-AG-SU-0946-00
KAIG3-RFI-SW-A-0263 00 KAIG3-RFI-SW-A-0263-00
KAIG3-RFI-SW-A-0264 00 KAIG3-RFI-SW-A-0264-00
KAIG3-RFI-SW-S-1360 00 KAIG3-RFI-SW-S-1360-00
KAIG3-RFI-SW-S-1361 00 KAIG3-RFI-SW-S-1361-00
KAIG3-RFI-SW-S-1362 00 KAIG3-RFI-SW-S-1362-00
KAIG3-RFI-SW-A-0265 00 KAIG3-RFI-SW-A-0265-00
KAIG3-RFI-SW-A-0266 00 KAIG3-RFI-SW-A-0266-00
KAIG3-RFI-SW-A-0267 00 KAIG3-RFI-SW-A-0267-00
KAIG3-RFI-MB-E-0085 01 KAIG3-RFI-MB-E-0085-01
KAIG3-RFI-SW-LS-0093 01 KAIG3-RFI-SW-LS-0093-01
KAIG3-RFI-BG-SU-0841 01 KAIG3-RFI-BG-SU-0841-01
KAIG3-RFI-SW-LS-0107 00 KAIG3-RFI-SW-LS-0107-00
KAIG3-RFI-SW-LS-0106 00 KAIG3-RFI-SW-LS-0106-00
KAIG3-RFI-SW-SU-0938 00 KAIG3-RFI-SW-SU-0938-00
KAIG3-RFI-SW-SU-0939 00 KAIG3-RFI-SW-SU-0939-00
KAIG3-RFI-PA-S-1348 00 KAIG3-RFI-PA-S-1348-00
KAIG3-RFI-PA-S-1349 00 KAIG3-RFI-PA-S-1349-00
KAIG3-RFI-SW-LS-0108 00 KAIG3-RFI-SW-LS-0108-00
KAIG3-RFI-SW-S-1333 00 KAIG3-RFI-SW-S-1333-00
KAIG3-RFI-SW-S-1347 00 KAIG3-RFI-SW-S-1347-00
KAIG3-RFI-SW-LS-0104 00 KAIG3-RFI-SW-LS-0104-00
KAIG3-RFI-SW-S-1344 00 KAIG3-RFI-SW-S-1344-00
KAIG3-RFI-SW-S-1345 00 KAIG3-RFI-SW-S-1345-00
KAIG3-RFI-WG-SU-0945 00 KAIG3-RFI-WG-SU-0945-00
KAIG3-RFI-MB-SU-0944 00 KAIG3-RFI-MB-SU-0944-00
KAIG3-RFI-MB-S-1358 00 KAIG3-RFI-MB-S-1358-00
KAIG3-RFI-SW-SU-0937 00 KAIG3-RFI-SW-SU-0937-00
KAIG3-RFI-SW-SU-0936 00 KAIG3-RFI-SW-SU-0936-00
KAIG3-RFI-SW-SU-0935 00 KAIG3-RFI-SW-SU-0935-00
KAIG3-RFI-SW-SU-0934 00 KAIG3-RFI-SW-SU-0934-00
KAIG3-RFI-SW-S-1343 00 KAIG3-RFI-SW-S-1343-00
KAIG3-RFI-SW-S-1286 00 KAIG3-RFI-SW-S-1286-00
KAIG3-RFI-TB-S-1346 00 KAIG3-RFI-TB-S-1346-00
KAIG3-RFI-SW-S-1334 00 KAIG3-RFI-SW-S-1334-00
KAIG3-RFI-TB-S-1336 00 KAIG3-RFI-TB-S-1336-00
KAIG3-RFI-TB-S-1337 00 KAIG3-RFI-TB-S-1337-00
KAIG3-RFI-TB-S-1339 00 KAIG3-RFI-TB-S-1339-00
KAIG3-RFI-TB-S-1340 00 KAIG3-RFI-TB-S-1340-00
KAIG3-RFI-TB-S-1341 00 KAIG3-RFI-TB-S-1341-00
KAIG3-RFI-TB-S-1342 00 KAIG3-RFI-TB-S-1342-00
KAIG3-RFI-CO-S-1357 00 KAIG3-RFI-CO-S-1357-00
KAIG3-RFI-CO-S-1356 00 KAIG3-RFI-CO-S-1356-00
KAIG3-RFI-CO-S-1355 00 KAIG3-RFI-CO-S-1355-00
KAIG3-RFI-CO-S-1354 00 KAIG3-RFI-CO-S-1354-00
KAIG3-RFI-CO-S-1352 00 KAIG3-RFI-CO-S-1352-00
KAIG3-RFI-CO-SU-0943 00 KAIG3-RFI-CO-SU-0943-00
KAIG3-RFI-CO-SU-0942 00 KAIG3-RFI-CO-SU-0942-00
KAIG3-RFI-CO-SU-0941 00 KAIG3-RFI-CO-SU-0941-00
KAIG3-RFI-SM-SU-0940 00 KAIG3-RFI-SM-SU-0940-00
KAIG3-RFI-EC-SU-0933 00 KAIG3-RFI-EC-SU-0933-00
KAIG3-RFI-EC-SU-0932 00 KAIG3-RFI-EC-SU-0932-00
KAIG3-RFI-MB-LC-0023 02 KAIG3-RFI-MB-LC-0023-02
KAIG3-RFI-BO-LC-0092 00 KAIG3-RFI-BO-LC-0092-00
KAIG3-RFI-BO-LC-0091 00 KAIG3-RFI-BO-LC-0091-00
KAIG3-RFI-BO-E-0094 00 KAIG3-RFI-BO-E-0094-00
KAIG3-RFI-BO-E-0093 00 KAIG3-RFI-BO-E-0093-00
KAIG3-RFI-ZG-A-0247 01 KAIG3-RFI-ZG-A-0247-01
KAIG3-RFI-SW-S-1327 00 KAIG3-RFI-SW-S-1327-00
KAIG3-RFI-SW-LS-0102 00 KAIG3-RFI-SW-LS-0102-00
KAIG3-RFI-PA-S-1331 00 KAIG3-RFI-PA-S-1331-00
KAIG3-RFI-PA-S-1329 00 KAIG3-RFI-PA-S-1329-00
KAIG3-RFI-PA-S-1330 00 KAIG3-RFI-PA-S-1330-00
KAIG3-RFI-PA-S-1328 00 KAIG3-RFI-PA-S-1328-00
KAIG3-RFI-AG-SU-0874 02 KAIG3-RFI-AG-SU-0874-02
KAIG3-RFI-TB-SU-0909 01 KAIG3-RFI-TB-SU-0909-01
KAIG3-RFI-SW-S-1332 00 KAIG3-RFI-SW-S-1332-00
KAIG3-RFI-SW-S-1312 00 KAIG3-RFI-SW-S-1312-00
KAIG3-RFI-SW-SU-0931 00 KAIG3-RFI-SW-SU-0931-00
KAIG3-RFI-SW-SU-0930 00 KAIG3-RFI-SW-SU-0930-00
KAIG3-RFI-SW-SU-0929 00 KAIG3-RFI-SW-SU-0929-00
KAIG3-RFI-SW-SU-0928 00 KAIG3-RFI-SW-SU-0928-00
KAIG3-RFI-CO-SU-0887 01 KAIG3-RFI-CO-SU-0887-01
KAIG3-RFI-SW-S-1326 00 KAIG3-RFI-SW-S-1326-00
KAIG3-RFI-SW-S-1325 00 KAIG3-RFI-SW-S-1325-00
KAIG3-RFI-BO-LC-0090 00 KAIG3-RFI-BO-LC-0090-00
KAIG3-RFI-BO-E-0092 00 KAIG3-RFI-BO-E-0092-00
KAIG3-RFI-MB-S-1294 00 KAIG3-RFI-MB-S-1294-00
KAIG3-RFI-SW-S-1244 00 KAIG3-RFI-SW-S-1244-00
KAIG3-RFI-SW-SU-0921 00 KAIG3-RFI-SW-SU-0921-00
KAIG3-RFI-SW-S-1324 00 KAIG3-RFI-SW-S-1324-00
KAIG3-RFI-SW-SU-0926 00 KAIG3-RFI-SW-SU-0926-00
KAIG3-RFI-SW-S-1320 00 KAIG3-RFI-SW-S-1320-00
KAIG3-RFI-SW-SU-0925 00 KAIG3-RFI-SW-SU-0925-00
KAIG3-RFI-SW-S-1319 00 KAIG3-RFI-SW-S-1319-00
KAIG3-RFI-SW-A-0262 00 KAIG3-RFI-SW-A-0262-00
KAIG3-RFI-SW-S-1321 00 KAIG3-RFI-SW-S-1321-00
KAIG3-RFI-CO-S-1323 00 KAIG3-RFI-CO-S-1323-00
KAIG3-RFI-CO-S-1322 00 KAIG3-RFI-CO-S-1322-00
KAIG3-RFI-CO-SU-0927 00 KAIG3-RFI-CO-SU-0927-00
KAIG3-RFI-EC-SU-0918 00 KAIG3-RFI-EC-SU-0918-00
KAIG3-RFI-GN-LS-0063 02 KAIG3-RFI-GN-LS-0063-02
KAIG3-RFI-GN-LS-0072 02 KAIG3-RFI-GN-LS-0072-02
KAIG3-RFI-GN-LS-0080 02 KAIG3-RFI-GN-LS-0080-02
KAIG3-RFI-GN-LS-0086 01 KAIG3-RFI-GN-LS-0086-01
KAIG3-RFI-BG-SU-0867 02 KAIG3-RFI-BG-SU-0867-02
KAIG3-RFI-BO-A-0245 01 KAIG3-RFI-BO-A-0245-01
KAIG3-RFI-SW-LS-0097 00 KAIG3-RFI-SW-LS-0097-00
KAIG3-RFI-SW-LS-0098 00 KAIG3-RFI-SW-LS-0098-00
KAIG3-RFI-SW-SU-0922 00 KAIG3-RFI-SW-SU-0922-00
KAIG3-RFI-SW-LS-0099 00 KAIG3-RFI-SW-LS-0099-00
KAIG3-RFI-SW-LS-0100 00 KAIG3-RFI-SW-LS-0100-00
KAIG3-RFI-SW-LS-0101 00 KAIG3-RFI-SW-LS-0101-00
KAIG3-RFI-SW-S-1307 00 KAIG3-RFI-SW-S-1307-00
KAIG3-RFI-SW-S-1299 00 KAIG3-RFI-SW-S-1299-00
KAIG3-RFI-SW-S-1298 00 KAIG3-RFI-SW-S-1298-00
KAIG3-RFI-MB-S-1317 00 KAIG3-RFI-MB-S-1317-00
KAIG3-RFI-SW-S-1297 00 KAIG3-RFI-SW-S-1297-00
KAIG3-RFI-SW-S-1310 00 KAIG3-RFI-SW-S-1310-00
KAIG3-RFI-SW-S-1309 00 KAIG3-RFI-SW-S-1309-00
KAIG3-RFI-MB-SU-0924 00 KAIG3-RFI-MB-SU-0924-00
KAIG3-RFI-SW-S-1301 00 KAIG3-RFI-SW-S-1301-00
KAIG3-RFI-SW-S-1302 00 KAIG3-RFI-SW-S-1302-00
KAIG3-RFI-SW-S-1308 00 KAIG3-RFI-SW-S-1308-00
KAIG3-RFI-MB-SU-0923 00 KAIG3-RFI-MB-SU-0923-00
KAIG3-RFI-MB-S-1316 00 KAIG3-RFI-MB-S-1316-00
KAIG3-RFI-MB-S-1318 00 KAIG3-RFI-MB-S-1318-00
KAIG3-RFI-SW-S-1290 00 KAIG3-RFI-SW-S-1290-00
KAIG3-RFI-SW-S-1291 00 KAIG3-RFI-SW-S-1291-00
KAIG3-RFI-SW-SU-0918 00 KAIG3-RFI-SW-SU-0918-00
KAIG3-RFI-SW-SU-0919 00 KAIG3-RFI-SW-SU-0919-00
KAIG3-RFI-MB-S-1313 00 KAIG3-RFI-MB-S-1313-00
KAIG3-RFI-SW-S-1300 00 KAIG3-RFI-SW-S-1300-00
KAIG3-RFI-BO-E-0091 00 KAIG3-RFI-BO-E-0091-00
KAIG3-RFI-BO-LC-0089 00 KAIG3-RFI-BO-LC-0089-00
KAIG3-RFI-CO-S-1315 00 KAIG3-RFI-CO-S-1315-00
KAIG3-RFI-CO-S-1314 00 KAIG3-RFI-CO-S-1314-00
KAIG3-RFI-CO-SU-0920 00 KAIG3-RFI-CO-SU-0920-00
KAIG3-RFI-BO-E-0090 00 KAIG3-RFI-BO-E-0090-00
KAIG3-RFI-BO-LC-0088 00 KAIG3-RFI-BO-LC-0088-00
KAIG3-RFI-SW-S-1305 00 KAIG3-RFI-SW-S-1305-00
KAIG3-RFI-SW-S-1306 00 KAIG3-RFI-SW-S-1306-00
KAIG3-RFI-PA-S-1303 00 KAIG3-RFI-PA-S-1303-00
KAIG3-RFI-PA-S-1304 00 KAIG3-RFI-PA-S-1304-00
KAIG3-RFI-SW-SU-0917 00 KAIG3-RFI-SW-SU-0917-00
KAIG3-RFI-SW-A-0261 00 KAIG3-RFI-SW-A-0261-00
KAIG3-RFI-SW-A-0260 00 KAIG3-RFI-SW-A-0260-00
KAIG3-RFI-SW-A-0259 00 KAIG3-RFI-SW-A-0259-00
KAIG3-RFI-FC-A-0258 00 KAIG3-RFI-FC-A-0258-00
KAIG3-RFI-SW-S-1289 00 KAIG3-RFI-SW-S-1289-00
KAIG3-RFI-SW-S-1288 00 KAIG3-RFI-SW-S-1288-00
KAIG3-RFI-MB-S-1293 00 KAIG3-RFI-MB-S-1293-00
KAIG3-RFI-MB-S-1273 00 KAIG3-RFI-MB-S-1273-00
KAIG3-RFI-SW-S-1296 00 KAIG3-RFI-SW-S-1296-00
KAIG3-RFI-SW-S-1295 00 KAIG3-RFI-SW-S-1295-00
KAIG3-RFI-PT-S-1292 00 KAIG3-RFI-PT-S-1292-00
KAIG3-RFI-PT-SU-0915 00 KAIG3-RFI-PT-SU-0915-00
KAIG3-RFI-MB-SU-0916 00 KAIG3-RFI-MB-SU-0916-00
KAIG3-RFI-GN-SU-0852 01 KAIG3-RFI-GN-SU-0852-01
KAIG3-RFI-CO-S-1287 00 KAIG3-RFI-CO-S-1287-00
KAIG3-RFI-CO-SU-0914 00 KAIG3-RFI-CO-SU-0914-00
KAIG3-RFI-CO-SU-0913 00 KAIG3-RFI-CO-SU-0913-00
KAIG3-RFI-SW-LS-0091 00 KAIG3-RFI-SW-LS-0091-00
KAIG3-RFI-SW-LS-0092 00 KAIG3-RFI-SW-LS-0092-00
KAIG3-RFI-SW-LS-0093 00 KAIG3-RFI-SW-LS-0093-00
KAIG3-RFI-SW-LS-0094 00 KAIG3-RFI-SW-LS-0094-00
KAIG3-RFI-SW-LS-0095 00 KAIG3-RFI-SW-LS-0095-00
KAIG3-RFI-SW-LS-0096 00 KAIG3-RFI-SW-LS-0096-00
KAIG3-RFI-SW-SU-0910 00 KAIG3-RFI-SW-SU-0910-00
KAIG3-RFI-SW-SU-0911 00 KAIG3-RFI-SW-SU-0911-00
KAIG3-RFI-SW-SU-0912 00 KAIG3-RFI-SW-SU-0912-00
KAIG3-RFI-SW-S-1263 00 KAIG3-RFI-SW-S-1263-00
KAIG3-RFI-TB-S-1277 00 KAIG3-RFI-TB-S-1277-00
KAIG3-RFI-TB-S-1276 00 KAIG3-RFI-TB-S-1276-00
KAIG3-RFI-SW-S-1261 00 KAIG3-RFI-SW-S-1261-00
KAIG3-RFI-TB-S-1275 00 KAIG3-RFI-TB-S-1275-00
KAIG3-RFI-TB-S-1274 00 KAIG3-RFI-TB-S-1274-00
KAIG3-RFI-TB-SU-0909 00 KAIG3-RFI-TB-SU-0909-00
KAIG3-RFI-SW-SU-0907 00 KAIG3-RFI-SW-SU-0907-00
KAIG3-RFI-TB-S-1278 00 KAIG3-RFI-TB-S-1278-00
KAIG3-RFI-CO-SU-0894 01 KAIG3-RFI-CO-SU-0894-01
KAIG3-RFI-CO-S-1285 00 KAIG3-RFI-CO-S-1285-00
KAIG3-RFI-CO-S-1284 00 KAIG3-RFI-CO-S-1284-00
KAIG3-RFI-CO-S-1283 00 KAIG3-RFI-CO-S-1283-00
KAIG3-RFI-CO-S-1282 00 KAIG3-RFI-CO-S-1282-00
KAIG3-RFI-CO-S-1281 00 KAIG3-RFI-CO-S-1281-00
KAIG3-RFI-CO-S-1280 00 KAIG3-RFI-CO-S-1280-00
KAIG3-RFI-CO-S-1279 00 KAIG3-RFI-CO-S-1279-00
KAIG3-RFI-BO-SU-0890 01 KAIG3-RFI-BO-SU-0890-01
KAIG3-RFI-FC-SU-0892 01 KAIG3-RFI-FC-SU-0892-01
KAIG3-RFI-SW-S-1260 00 KAIG3-RFI-SW-S-1260-00
KAIG3-RFI-SW-S-1262 00 KAIG3-RFI-SW-S-1262-00
KAIG3-RFI-SW-SU-0904 00 KAIG3-RFI-SW-SU-0904-00
KAIG3-RFI-PA-S-1271 00 KAIG3-RFI-PA-S-1271-00
KAIG3-RFI-SW-S-1245 00 KAIG3-RFI-SW-S-1245-00
KAIG3-RFI-BO-A-0257 00 KAIG3-RFI-BO-A-0257-00
KAIG3-RFI-BO-A-0256 00 KAIG3-RFI-BO-A-0256-00
KAIG3-RFI-MB-SU-0905 00 KAIG3-RFI-MB-SU-0905-00
KAIG3-RFI-BO-A-0255 00 KAIG3-RFI-BO-A-0255-00
KAIG3-RFI-FC-S-1240 00 KAIG3-RFI-FC-S-1240-00
KAIG3-RFI-BO-LC-0087 00 KAIG3-RFI-BO-LC-0087-00
KAIG3-RFI-BO-E-0089 00 KAIG3-RFI-BO-E-0089-00
KAIG3-RFI-CO-S-1270 00 KAIG3-RFI-CO-S-1270-00
KAIG3-RFI-CO-S-1269 00 KAIG3-RFI-CO-S-1269-00
KAIG3-RFI-CO-S-1268 00 KAIG3-RFI-CO-S-1268-00
KAIG3-RFI-CO-S-1267 00 KAIG3-RFI-CO-S-1267-00
KAIG3-RFI-CO-S-1266 00 KAIG3-RFI-CO-S-1266-00
KAIG3-RFI-CO-S-1265 00 KAIG3-RFI-CO-S-1265-00
KAIG3-RFI-CO-S-1264 00 KAIG3-RFI-CO-S-1264-00
KAIG3-RFI-CO-SU-0906 00 KAIG3-RFI-CO-SU-0906-00
KAIG3-RFI-GN-LS-0067 02 KAIG3-RFI-GN-LS-0067-02
KAIG3-RFI-CO-S-1259 00 KAIG3-RFI-CO-S-1259-00
KAIG3-RFI-CO-S-1258 00 KAIG3-RFI-CO-S-1258-00
KAIG3-RFI-CO-S-1257 00 KAIG3-RFI-CO-S-1257-00
KAIG3-RFI-CO-S-1256 00 KAIG3-RFI-CO-S-1256-00
KAIG3-RFI-CO-S-1255 00 KAIG3-RFI-CO-S-1255-00
KAIG3-RFI-CO-S-1254 00 KAIG3-RFI-CO-S-1254-00
KAIG3-RFI-CO-S-1253 00 KAIG3-RFI-CO-S-1253-00
KAIG3-RFI-CO-S-1252 00 KAIG3-RFI-CO-S-1252-00
KAIG3-RFI-CO-SU-0903 00 KAIG3-RFI-CO-SU-0903-00
KAIG3-RFI-CO-SU-0902 00 KAIG3-RFI-CO-SU-0902-00
KAIG3-RFI-GN-LS-0090 00 KAIG3-RFI-GN-LS-0090-00
KAIG3-RFI-GN-LS-0087 00 KAIG3-RFI-GN-LS-0087-00
KAIG3-RFI-GN-LS-0089 00 KAIG3-RFI-GN-LS-0089-00
KAIG3-RFI-GN-LS-0088 00 KAIG3-RFI-GN-LS-0088-00
KAIG3-RFI-GN-S-1250 00 KAIG3-RFI-GN-S-1250-00
KAIG3-RFI-GN-S-1251 00 KAIG3-RFI-GN-S-1251-00
KAIG3-RFI-BO-S-1249 00 KAIG3-RFI-BO-S-1249-00
KAIG3-RFI-BO-SU-0900 00 KAIG3-RFI-BO-SU-0900-00
KAIG3-RFI-BO-SU-0901 00 KAIG3-RFI-BO-SU-0901-00
KAIG3-RFI-BO-S-1231 00 KAIG3-RFI-BO-S-1231-00
KAIG3-RFI-BO-A-0254 00 KAIG3-RFI-BO-A-0254-00
KAIG3-RFI-GN-SU-0895 00 KAIG3-RFI-GN-SU-0895-00
KAIG3-RFI-GN-SU-0898 00 KAIG3-RFI-GN-SU-0898-00
KAIG3-RFI-GN-SU-0897 00 KAIG3-RFI-GN-SU-0897-00
KAIG3-RFI-GN-SU-0896 00 KAIG3-RFI-GN-SU-0896-00
KAIG3-RFI-GN-S-1159 01 KAIG3-RFI-GN-S-1159-01
KAIG3-RFI-GN-S-1246 00 KAIG3-RFI-GN-S-1246-00
KAIG3-RFI-GN-S-1162 01 KAIG3-RFI-GN-S-1162-01
KAIG3-RFI-MB-S-1242 00 KAIG3-RFI-MB-S-1242-00
KAIG3-RFI-BO-S-1223 00 KAIG3-RFI-BO-S-1223-00
KAIG3-RFI-CO-GE-0434 00 KAIG3-RFI-CO-GE-0434-00
KAIG3-RFI-CO-SU-0899 00 KAIG3-RFI-CO-SU-0899-00
KAIG3-RFI-BO-S-1248 00 KAIG3-RFI-BO-S-1248-00
KAIG3-RFI-MB-A-0248 01 KAIG3-RFI-MB-A-0248-01
KAIG3-RFI-GN-S-1230 01 KAIG3-RFI-GN-S-1230-01
KAIG3-RFI-GN-S-1029 02 KAIG3-RFI-GN-S-1029-02
KAIG3-RFI-GN-LS-0080 01 KAIG3-RFI-GN-LS-0080-01
KAIG3-RFI-GN-LS-0069 01 KAIG3-RFI-GN-LS-0069-01
KAIG3-RFI-CO-SU-0879 01 KAIG3-RFI-CO-SU-0879-01
KAIG3-RFI-AG-SU-0874 01 KAIG3-RFI-AG-SU-0874-01
KAIG3-RFI-GN-LS-0086 00 KAIG3-RFI-GN-LS-0086-00
KAIG3-RFI-GN-LS-0084 00 KAIG3-RFI-GN-LS-0084-00
KAIG3-RFI-GN-LS-0085 00 KAIG3-RFI-GN-LS-0085-00
KAIG3-RFI-BO-SU-0890 00 KAIG3-RFI-BO-SU-0890-00
KAIG3-RFI-BO-SU-0891 00 KAIG3-RFI-BO-SU-0891-00
KAIG3-RFI-FC-S-1239 00 KAIG3-RFI-FC-S-1239-00
KAIG3-RFI-FC-SU-0892 00 KAIG3-RFI-FC-SU-0892-00
KAIG3-RFI-TB-SU-0889 00 KAIG3-RFI-TB-SU-0889-00
KAIG3-RFI-MB-SU-0893 00 KAIG3-RFI-MB-SU-0893-00
KAIG3-RFI-FC-A-0251 00 KAIG3-RFI-FC-A-0251-00
KAIG3-RFI-BO-A-0253 00 KAIG3-RFI-BO-A-0253-00
KAIG3-RFI-BO-A-0252 00 KAIG3-RFI-BO-A-0252-00
KAIG3-RFI-MB-S-1241 00 KAIG3-RFI-MB-S-1241-00
KAIG3-RFI-BO-S-1225 00 KAIG3-RFI-BO-S-1225-00
KAIG3-RFI-GN-S-1243 00 KAIG3-RFI-GN-S-1243-00
KAIG3-RFI-CO-SU-0894 00 KAIG3-RFI-CO-SU-0894-00
KAIG3-RFI-BO-E-0087 00 KAIG3-RFI-BO-E-0087-00
KAIG3-RFI-BO-LC-0085 00 KAIG3-RFI-BO-LC-0085-00
KAIG3-RFI-MB-P-0042 00 KAIG3-RFI-MB-P-0042-00
KAIG3-RFI-BO-E-0088 00 KAIG3-RFI-BO-E-0088-00
KAIG3-RFI-BO-LC-0086 00 KAIG3-RFI-BO-LC-0086-00
KAIG3-RFI-GN-S-1237 00 KAIG3-RFI-GN-S-1237-00
KAIG3-RFI-MB-SU-0886 00 KAIG3-RFI-MB-SU-0886-00
KAIG3-RFI-PT-S-1238 00 KAIG3-RFI-PT-S-1238-00
KAIG3-RFI-BO-S-1227 00 KAIG3-RFI-BO-S-1227-00
KAIG3-RFI-MB-S-1234 00 KAIG3-RFI-MB-S-1234-00
KAIG3-RFI-MB-S-1232 00 KAIG3-RFI-MB-S-1232-00
KAIG3-RFI-MB-S-1233 00 KAIG3-RFI-MB-S-1233-00
KAIG3-RFI-CO-S-1236 00 KAIG3-RFI-CO-S-1236-00
KAIG3-RFI-CO-S-1235 00 KAIG3-RFI-CO-S-1235-00
KAIG3-RFI-CO-SU-0888 00 KAIG3-RFI-CO-SU-0888-00
KAIG3-RFI-CO-SU-0887 00 KAIG3-RFI-CO-SU-0887-00
KAIG3-RFI-GN-SU-0844 01 KAIG3-RFI-GN-SU-0844-01
KAIG3-RFI-GN-LS-0072 01 KAIG3-RFI-GN-LS-0072-01
KAIG3-RFI-GN-LS-0067 01 KAIG3-RFI-GN-LS-0067-01
KAIG3-RFI-BO-A-0243 01 KAIG3-RFI-BO-A-0243-01
KAIG3-RFI-GN-LS-0063 01 KAIG3-RFI-GN-LS-0063-01
KAIG3-RFI-GN-S-1230 00 KAIG3-RFI-GN-S-1230-00
KAIG3-RFI-BO-A-0250 00 KAIG3-RFI-BO-A-0250-00
KAIG3-RFI-CO-S-0476 02 KAIG3-RFI-CO-S-0476-02
KAIG3-RFI-GN-LS-0083 00 KAIG3-RFI-GN-LS-0083-00
KAIG3-RFI-GN-SU-0885 00 KAIG3-RFI-GN-SU-0885-00
KAIG3-RFI-GN-SU-0883 00 KAIG3-RFI-GN-SU-0883-00
KAIG3-RFI-GN-SU-0884 00 KAIG3-RFI-GN-SU-0884-00
KAIG3-RFI-GN-S-1229 00 KAIG3-RFI-GN-S-1229-00
KAIG3-RFI-GN-S-1228 00 KAIG3-RFI-GN-S-1228-00
KAIG3-RFI-CO-GE-0433 00 KAIG3-RFI-CO-GE-0433-00
KAIG3-RFI-CO-GE-0432 00 KAIG3-RFI-CO-GE-0432-00
KAIG3-RFI-CO-SU-0873 00 KAIG3-RFI-CO-SU-0873-00
KAIG3-RFI-MB-LC-0084 00 KAIG3-RFI-MB-LC-0084-00
KAIG3-RFI-MB-LC-0083 00 KAIG3-RFI-MB-LC-0083-00
KAIG3-RFI-MB-E-0086 00 KAIG3-RFI-MB-E-0086-00
KAIG3-RFI-MB-E-0085 00 KAIG3-RFI-MB-E-0085-00
KAIG3-RFI-BO-S-1224 00 KAIG3-RFI-BO-S-1224-00
KAIG3-RFI-BO-S-1222 00 KAIG3-RFI-BO-S-1222-00
KAIG3-RFI-BO-S-1226 00 KAIG3-RFI-BO-S-1226-00
KAIG3-RFI-MB-A-0248 00 KAIG3-RFI-MB-A-0248-00
KAIG3-RFI-MB-A-0249 00 KAIG3-RFI-MB-A-0249-00
KAIG3-RFI-BG-SU-0867 01 KAIG3-RFI-BG-SU-0867-01
KAIG3-RFI-BO-SU-0880 00 KAIG3-RFI-BO-SU-0880-00
KAIG3-RFI-BO-SU-0881 00 KAIG3-RFI-BO-SU-0881-00
KAIG3-RFI-GN-LS-0080 00 KAIG3-RFI-GN-LS-0080-00
KAIG3-RFI-GN-LS-0082 00 KAIG3-RFI-GN-LS-0082-00
KAIG3-RFI-GN-LS-0881 00 KAIG3-RFI-GN-LS-0881-00
KAIG3-RFI-CO-S-1221 00 KAIG3-RFI-CO-S-1221-00
KAIG3-RFI-CO-SU-0879 00 KAIG3-RFI-CO-SU-0879-00
KAIG3-RFI-CO-SU-0878 00 KAIG3-RFI-CO-SU-0878-00
KAIG3-RFI-CO-SU-0876 00 KAIG3-RFI-CO-SU-0876-00
KAIG3-RFI-GN-LS-0064 01 KAIG3-RFI-GN-LS-0064-01
KAIG3-RFI-GN-LS-0077 00 KAIG3-RFI-GN-LS-0077-00
KAIG3-RFI-GN-LS-0078 00 KAIG3-RFI-GN-LS-0078-00
KAIG3-RFI-GN-LS-0079 00 KAIG3-RFI-GN-LS-0079-00
KAIG3-RFI-AG-SU-0874 00 KAIG3-RFI-AG-SU-0874-00
KAIG3-RFI-BO-S-1219 00 KAIG3-RFI-BO-S-1219-00
KAIG3-RFI-MB-P-0041 00 KAIG3-RFI-MB-P-0041-00
KAIG3-RFI-MB-P-0040 00 KAIG3-RFI-MB-P-0040-00
KAIG3-RFI-TT-LC-0082 00 KAIG3-RFI-TT-LC-0082-00
KAIG3-RFI-TB-LC-0081 00 KAIG3-RFI-TB-LC-0081-00
KAIG3-RFI-TB-LC-0080 00 KAIG3-RFI-TB-LC-0080-00
KAIG3-RFI-TB-LC-0079 00 KAIG3-RFI-TB-LC-0079-00
KAIG3-RFI-TT-E-0084 00 KAIG3-RFI-TT-E-0084-00
KAIG3-RFI-CO-S-1128 01 KAIG3-RFI-CO-S-1128-01
KAIG3-RFI-CO-S-1136 01 KAIG3-RFI-CO-S-1136-01
KAIG3-RFI-TB-E-0083 00 KAIG3-RFI-TB-E-0083-00
KAIG3-RFI-TB-E-0082 00 KAIG3-RFI-TB-E-0082-00
KAIG3-RFI-CO-S-1218 00 KAIG3-RFI-CO-S-1218-00
KAIG3-RFI-CO-S-1217 00 KAIG3-RFI-CO-S-1217-00
KAIG3-RFI-CO-SU-0875 00 KAIG3-RFI-CO-SU-0875-00
KAIG3-RFI-CO-S-1150 01 KAIG3-RFI-CO-S-1150-01
KAIG3-RFI-CO-S-1151 01 KAIG3-RFI-CO-S-1151-01
KAIG3-RFI-CO-GE-0431 00 KAIG3-RFI-CO-GE-0431-00
KAIG3-RFI-CO-GE-0430 00 KAIG3-RFI-CO-GE-0430-00
KAIG3-RFI-CO-GE-0429 00 KAIG3-RFI-CO-GE-0429-00
KAIG3-RFI-CO-GE-0428 00 KAIG3-RFI-CO-GE-0428-00
KAIG3-RFI-CO-GE-0427 00 KAIG3-RFI-CO-GE-0427-00
KAIG3-RFI-CO-GE-0426 00 KAIG3-RFI-CO-GE-0426-00
KAIG3-RFI-CO-GE-0425 00 KAIG3-RFI-CO-GE-0425-00
KAIG3-RFI-CO-GE-0424 00 KAIG3-RFI-CO-GE-0424-00
KAIG3-RFI-CO-SU-0872 00 KAIG3-RFI-CO-SU-0872-00
KAIG3-RFI-BO-LC-0078 00 KAIG3-RFI-BO-LC-0078-00
KAIG3-RFI-BO-E-0081 00 KAIG3-RFI-BO-E-0081-00
KAIG3-RFI-GN-S-1030 01 KAIG3-RFI-GN-S-1030-01
KAIG3-RFI-PT-S-1039 01 KAIG3-RFI-PT-S-1039-01
KAIG3-RFI-GN-LS-0076 00 KAIG3-RFI-GN-LS-0076-00
KAIG3-RFI-GN-S-1212 00 KAIG3-RFI-GN-S-1212-00
KAIG3-RFI-BO-S-1201 00 KAIG3-RFI-BO-S-1201-00
KAIG3-RFI-BO-S-1211 00 KAIG3-RFI-BO-S-1211-00
KAIG3-RFI-BO-S-1214 00 KAIG3-RFI-BO-S-1214-00
KAIG3-RFI-BO-S-1213 00 KAIG3-RFI-BO-S-1213-00
KAIG3-RFI-CO-SU-0871 00 KAIG3-RFI-CO-SU-0871-00
KAIG3-RFI-CO-SU-0870 00 KAIG3-RFI-CO-SU-0870-00
KAIG3-RFI-CO-SU-0869 00 KAIG3-RFI-CO-SU-0869-00
KAIG3-RFI-BO-LC-0077 00 KAIG3-RFI-BO-LC-0077-00
KAIG3-RFI-BO-E-0080 00 KAIG3-RFI-BO-E-0080-00
KAIG3-RFI-CO-S-1216 00 KAIG3-RFI-CO-S-1216-00
KAIG3-RFI-MB-S-1199 00 KAIG3-RFI-MB-S-1199-00
KAIG3-RFI-CO-S-1215 00 KAIG3-RFI-CO-S-1215-00
KAIG3-RFI-CO-S-1210 00 KAIG3-RFI-CO-S-1210-00
KAIG3-RFI-CO-S-1209 00 KAIG3-RFI-CO-S-1209-00
KAIG3-RFI-CO-SU-0868 00 KAIG3-RFI-CO-SU-0868-00
KAIG3-RFI-GN-LS-0074 00 KAIG3-RFI-GN-LS-0074-00
KAIG3-RFI-GN-LS-0072 00 KAIG3-RFI-GN-LS-0072-00
KAIG3-RFI-GN-LS-0073 00 KAIG3-RFI-GN-LS-0073-00
KAIG3-RFI-GN-LS-0071 00 KAIG3-RFI-GN-LS-0071-00
KAIG3-RFI-GN-S-1202 00 KAIG3-RFI-GN-S-1202-00
KAIG3-RFI-GN-LS-0075 00 KAIG3-RFI-GN-LS-0075-00
KAIG3-RFI-ZG-A-0247 00 KAIG3-RFI-ZG-A-0247-00
KAIG3-RFI-MB-SU-0824 00 KAIG3-RFI-MB-SU-0824-00
KAIG3-RFI-MB-SU-0866 00 KAIG3-RFI-MB-SU-0866-00
KAIG3-RFI-MB-SU-0823 00 KAIG3-RFI-MB-SU-0823-00
KAIG3-RFI-BG-SU-0867 00 KAIG3-RFI-BG-SU-0867-00
KAIG3-RFI-GN-S-1029 01 KAIG3-RFI-GN-S-1029-01
KAIG3-RFI-MB-S-1206 00 KAIG3-RFI-MB-S-1206-00
KAIG3-RFI-MB-S-1207 00 KAIG3-RFI-MB-S-1207-00
KAIG3-RFI-BO-S-1208 00 KAIG3-RFI-BO-S-1208-00
KAIG3-RFI-BO-LC-0076 00 KAIG3-RFI-BO-LC-0076-00
KAIG3-RFI-BO-E-0079 00 KAIG3-RFI-BO-E-0079-00
KAIG3-RFI-TB-E-0078 00 KAIG3-RFI-TB-E-0078-00
KAIG3-RFI-MB-P-0021 00 KAIG3-RFI-MB-P-0021-00
KAIG3-RFI-CO-S-1205 00 KAIG3-RFI-CO-S-1205-00
KAIG3-RFI-CO-S-1204 00 KAIG3-RFI-CO-S-1204-00
KAIG3-RFI-CO-S-1203 00 KAIG3-RFI-CO-S-1203-00
KAIG3-RFI-CO-SU-0865 00 KAIG3-RFI-CO-SU-0865-00
KAIG3-RFI-CO-SU-0864 00 KAIG3-RFI-CO-SU-0864-00
KAIG3-RFI-FC-A-0237 01 KAIG3-RFI-FC-A-0237-01
KAIG3-RFI-MB-SU-0862 00 KAIG3-RFI-MB-SU-0862-00
KAIG3-RFI-BO-SU-0857 00 KAIG3-RFI-BO-SU-0857-00
KAIG3-RFI-BO-SU-0861 00 KAIG3-RFI-BO-SU-0861-00
KAIG3-RFI-BO-SU-0863 00 KAIG3-RFI-BO-SU-0863-00
KAIG3-RFI-BO-S-1200 00 KAIG3-RFI-BO-S-1200-00
KAIG3-RFI-TB-S-1194 00 KAIG3-RFI-TB-S-1194-00
KAIG3-RFI-MB-S-1198 00 KAIG3-RFI-MB-S-1198-00
KAIG3-RFI-BO-S-1195 00 KAIG3-RFI-BO-S-1195-00
KAIG3-RFI-BO-S-1196 00 KAIG3-RFI-BO-S-1196-00
KAIG3-RFI-BG-LS-0070 00 KAIG3-RFI-BG-LS-0070-00
KAIG3-RFI-BO-SU-0858 00 KAIG3-RFI-BO-SU-0858-00
KAIG3-RFI-CO-S-0504 01 KAIG3-RFI-CO-S-0504-01
KAIG3-RFI-CO-S-0506 01 KAIG3-RFI-CO-S-0506-01
KAIG3-RFI-CO-S-0510 01 KAIG3-RFI-CO-S-0510-01
KAIG3-RFI-CO-S-0518 01 KAIG3-RFI-CO-S-0518-01
KAIG3-RFI-CO-S-0520 01 KAIG3-RFI-CO-S-0520-01
KAIG3-RFI-CO-S-0528 01 KAIG3-RFI-CO-S-0528-01
KAIG3-RFI-CO-S-0921 01 KAIG3-RFI-CO-S-0921-01
KAIG3-RFI-GN-SU-0859 00 KAIG3-RFI-GN-SU-0859-00
KAIG3-RFI-CO-S-1190 00 KAIG3-RFI-CO-S-1190-00
KAIG3-RFI-CO-S-1189 00 KAIG3-RFI-CO-S-1189-00
KAIG3-RFI-CO-S-1188 00 KAIG3-RFI-CO-S-1188-00
KAIG3-RFI-CO-S-1187 00 KAIG3-RFI-CO-S-1187-00
KAIG3-RFI-BO-S-1184 00 KAIG3-RFI-BO-S-1184-00
KAIG3-RFI-BO-S-1183 00 KAIG3-RFI-BO-S-1183-00
KAIG3-RFI-BO-S-1182 00 KAIG3-RFI-BO-S-1182-00
KAIG3-RFI-BO-S-1181 00 KAIG3-RFI-BO-S-1181-00
KAIG3-RFI-MB-S-1191 00 KAIG3-RFI-MB-S-1191-00
KAIG3-RFI-MB-S-1192 00 KAIG3-RFI-MB-S-1192-00
KAIG3-RFI-MB-S-1193 00 KAIG3-RFI-MB-S-1193-00
KAIG3-RFI-MB-SU-0856 00 KAIG3-RFI-MB-SU-0856-00
KAIG3-RFI-BO-SU-0855 00 KAIG3-RFI-BO-SU-0855-00
KAIG3-RFI-BO-E-0077 00 KAIG3-RFI-BO-E-0077-00
KAIG3-RFI-BO-LC-0075 00 KAIG3-RFI-BO-LC-0075-00
KAIG3-RFI-CO-S-1186 00 KAIG3-RFI-CO-S-1186-00
KAIG3-RFI-CO-S-1185 00 KAIG3-RFI-CO-S-1185-00
KAIG3-RFI-BO-S-1176 00 KAIG3-RFI-BO-S-1176-00
KAIG3-RFI-BO-S-1177 00 KAIG3-RFI-BO-S-1177-00
KAIG3-RFI-BO-S-1175 00 KAIG3-RFI-BO-S-1175-00
KAIG3-RFI-BO-S-1174 00 KAIG3-RFI-BO-S-1174-00
KAIG3-RFI-TB-S-1178 00 KAIG3-RFI-TB-S-1178-00
KAIG3-RFI-BO-S-1179 00 KAIG3-RFI-BO-S-1179-00
KAIG3-RFI-BO-S-1180 00 KAIG3-RFI-BO-S-1180-00
KAIG3-RFI-TB-S-1170 00 KAIG3-RFI-TB-S-1170-00
KAIG3-RFI-BO-SU-0854 00 KAIG3-RFI-BO-SU-0854-00
KAIG3-RFI-TB-A-0246 00 KAIG3-RFI-TB-A-0246-00
KAIG3-RFI-TB-S-1169 00 KAIG3-RFI-TB-S-1169-00
KAIG3-RFI-GN-SU-0852 00 KAIG3-RFI-GN-SU-0852-00
KAIG3-RFI-GN-SU-0853 00 KAIG3-RFI-GN-SU-0853-00
KAIG3-RFI-GN-S-1173 00 KAIG3-RFI-GN-S-1173-00
KAIG3-RFI-GN-SU-0847 00 KAIG3-RFI-GN-SU-0847-00
KAIG3-RFI-BO-S-1062 00 KAIG3-RFI-BO-S-1062-00
KAIG3-RFI-TB-S-1048 00 KAIG3-RFI-TB-S-1048-00
KAIG3-RFI-BO-S-1061 00 KAIG3-RFI-BO-S-1061-00
KAIG3-RFI-TT-LC-0074 00 KAIG3-RFI-TT-LC-0074-00
KAIG3-RFI-CO-S-1172 00 KAIG3-RFI-CO-S-1172-00
KAIG3-RFI-CO-S-1171 00 KAIG3-RFI-CO-S-1171-00
KAIG3-RFI-CO-SU-0851 00 KAIG3-RFI-CO-SU-0851-00
KAIG3-RFI-CO-SU-0850 00 KAIG3-RFI-CO-SU-0850-00
KAIG3-RFI-TB-E-0071 01 KAIG3-RFI-TB-E-0071-01
KAIG3-RFI-TB-E-0070 01 KAIG3-RFI-TB-E-0070-01
KAIG3-RFI-BO-S-1166 00 KAIG3-RFI-BO-S-1166-00
KAIG3-RFI-TB-S-1164 00 KAIG3-RFI-TB-S-1164-00
KAIG3-RFI-TB-S-1168 00 KAIG3-RFI-TB-S-1168-00
KAIG3-RFI-TB-E-0076 00 KAIG3-RFI-TB-E-0076-00
KAIG3-RFI-TB-E-0075 00 KAIG3-RFI-TB-E-0075-00
KAIG3-RFI-TB-LC-0073 00 KAIG3-RFI-TB-LC-0073-00
KAIG3-RFI-TB-LC-0072 00 KAIG3-RFI-TB-LC-0072-00
KAIG3-RFI-TB-LC-0071 00 KAIG3-RFI-TB-LC-0071-00
KAIG3-RFI-TB-SU-0846 00 KAIG3-RFI-TB-SU-0846-00
KAIG3-RFI-GN-S-1161 00 KAIG3-RFI-GN-S-1161-00
KAIG3-RFI-GN-SU-0844 00 KAIG3-RFI-GN-SU-0844-00
KAIG3-RFI-GN-SU-0843 00 KAIG3-RFI-GN-SU-0843-00
KAIG3-RFI-GN-S-1162 00 KAIG3-RFI-GN-S-1162-00
KAIG3-RFI-TB-S-1167 00 KAIG3-RFI-TB-S-1167-00
KAIG3-RFI-BO-SU-0845 00 KAIG3-RFI-BO-SU-0845-00
KAIG3-RFI-TB-S-1158 00 KAIG3-RFI-TB-S-1158-00
KAIG3-RFI-BO-S-1165 00 KAIG3-RFI-BO-S-1165-00
KAIG3-RFI-GN-LS-0069 00 KAIG3-RFI-GN-LS-0069-00
KAIG3-RFI-GN-LS-0068 00 KAIG3-RFI-GN-LS-0068-00
KAIG3-RFI-GN-SU-0840 00 KAIG3-RFI-GN-SU-0840-00
KAIG3-RFI-GN-SU-0839 00 KAIG3-RFI-GN-SU-0839-00
KAIG3-RFI-GN-SU-0838 00 KAIG3-RFI-GN-SU-0838-00
KAIG3-RFI-GN-S-1159 00 KAIG3-RFI-GN-S-1159-00
KAIG3-RFI-GN-S-1160 00 KAIG3-RFI-GN-S-1160-00
KAIG3-RFI-BO-A-0244 00 KAIG3-RFI-BO-A-0244-00
KAIG3-RFI-BG-SU-0841 00 KAIG3-RFI-BG-SU-0841-00
KAIG3-RFI-BO-A-0245 00 KAIG3-RFI-BO-A-0245-00
KAIG3-RFI-CO-SU-0842 00 KAIG3-RFI-CO-SU-0842-00
KAIG3-RFI-BO-A-0243 00 KAIG3-RFI-BO-A-0243-00
KAIG3-RFI-BO-S-1157 00 KAIG3-RFI-BO-S-1157-00
KAIG3-RFI-BO-S-1156 00 KAIG3-RFI-BO-S-1156-00
KAIG3-RFI-BO-S-1155 00 KAIG3-RFI-BO-S-1155-00
KAIG3-RFI-BO-S-1154 00 KAIG3-RFI-BO-S-1154-00
KAIG3-RFI-BO-S-1153 00 KAIG3-RFI-BO-S-1153-00
KAIG3-RFI-CO-SU-0790 01 KAIG3-RFI-CO-SU-0790-01
KAIG3-RFI-BO-S-1125 00 KAIG3-RFI-BO-S-1125-00
KAIG3-RFI-BO-S-1124 00 KAIG3-RFI-BO-S-1124-00
KAIG3-RFI-BO-S-1149 00 KAIG3-RFI-BO-S-1149-00
KAIG3-RFI-TB-S-1145 00 KAIG3-RFI-TB-S-1145-00
KAIG3-RFI-TB-S-1146 00 KAIG3-RFI-TB-S-1146-00
KAIG3-RFI-TB-S-1147 00 KAIG3-RFI-TB-S-1147-00
KAIG3-RFI-BO-SU-0836 00 KAIG3-RFI-BO-SU-0836-00
KAIG3-RFI-TT-A-0242 00 KAIG3-RFI-TT-A-0242-00
KAIG3-RFI-BO-S-1148 00 KAIG3-RFI-BO-S-1148-00
KAIG3-RFI-BG-SU-0835 00 KAIG3-RFI-BG-SU-0835-00
KAIG3-RFI-GN-LS-0058 01 KAIG3-RFI-GN-LS-0058-01
KAIG3-RFI-GN-SU-0831 00 KAIG3-RFI-GN-SU-0831-00
KAIG3-RFI-GN-SU-0830 00 KAIG3-RFI-GN-SU-0830-00
KAIG3-RFI-GN-SU-0829 00 KAIG3-RFI-GN-SU-0829-00
KAIG3-RFI-GG-SU-0834 00 KAIG3-RFI-GG-SU-0834-00
KAIG3-RFI-GN-SU-0832 00 KAIG3-RFI-GN-SU-0832-00
KAIG3-RFI-GN-SU-0833 00 KAIG3-RFI-GN-SU-0833-00
KAIG3-RFI-CO-S-1151 00 KAIG3-RFI-CO-S-1151-00
KAIG3-RFI-CO-S-1150 00 KAIG3-RFI-CO-S-1150-00
KAIG3-RFI-CO-SU-0837 00 KAIG3-RFI-CO-SU-0837-00
KAIG3-RFI-BO-LC-0070 00 KAIG3-RFI-BO-LC-0070-00
KAIG3-RFI-BO-E-0074 00 KAIG3-RFI-BO-E-0074-00
KAIG3-RFI-CO-S-1144 00 KAIG3-RFI-CO-S-1144-00
KAIG3-RFI-TB-SU-0828 00 KAIG3-RFI-TB-SU-0828-00
KAIG3-RFI-TB-S-1142 00 KAIG3-RFI-TB-S-1142-00
KAIG3-RFI-TB-S-1143 00 KAIG3-RFI-TB-S-1143-00
KAIG3-RFI-BO-S-1064 00 KAIG3-RFI-BO-S-1064-00
KAIG3-RFI-BO-S-1060 00 KAIG3-RFI-BO-S-1060-00
KAIG3-RFI-BO-S-1091 00 KAIG3-RFI-BO-S-1091-00
KAIG3-RFI-GN-SU-0825 00 KAIG3-RFI-GN-SU-0825-00
KAIG3-RFI-GN-SU-0826 00 KAIG3-RFI-GN-SU-0826-00
KAIG3-RFI-GN-S-1139 00 KAIG3-RFI-GN-S-1139-00
KAIG3-RFI-GN-S-1138 00 KAIG3-RFI-GN-S-1138-00
KAIG3-RFI-MB-SU-0827 00 KAIG3-RFI-MB-SU-0827-00
KAIG3-RFI-MB-S-1141 00 KAIG3-RFI-MB-S-1141-00
KAIG3-RFI-MB-S-1140 00 KAIG3-RFI-MB-S-1140-00
KAIG3-RFI-BO-LC-0069 00 KAIG3-RFI-BO-LC-0069-00
KAIG3-RFI-BO-E-0073 00 KAIG3-RFI-BO-E-0073-00
KAIG3-RFI-BO-S-1123 00 KAIG3-RFI-BO-S-1123-00
KAIG3-RFI-BO-S-1122 00 KAIG3-RFI-BO-S-1122-00
KAIG3-RFI-BO-S-1121 00 KAIG3-RFI-BO-S-1121-00
KAIG3-RFI-BO-S-1120 00 KAIG3-RFI-BO-S-1120-00
KAIG3-RFI-TB-S-1118 00 KAIG3-RFI-TB-S-1118-00
KAIG3-RFI-TB-S-1119 00 KAIG3-RFI-TB-S-1119-00
KAIG3-RFI-TB-S-1058 00 KAIG3-RFI-TB-S-1058-00
KAIG3-RFI-CO-S-1137 00 KAIG3-RFI-CO-S-1137-00
KAIG3-RFI-CO-S-1136 00 KAIG3-RFI-CO-S-1136-00
KAIG3-RFI-CO-S-1135 00 KAIG3-RFI-CO-S-1135-00
KAIG3-RFI-CO-S-1134 00 KAIG3-RFI-CO-S-1134-00
KAIG3-RFI-CO-S-1133 00 KAIG3-RFI-CO-S-1133-00
KAIG3-RFI-CO-S-1132 00 KAIG3-RFI-CO-S-1132-00
KAIG3-RFI-CO-S-1131 00 KAIG3-RFI-CO-S-1131-00
KAIG3-RFI-CO-S-1130 00 KAIG3-RFI-CO-S-1130-00
KAIG3-RFI-CO-S-1129 00 KAIG3-RFI-CO-S-1129-00
KAIG3-RFI-CO-S-1128 00 KAIG3-RFI-CO-S-1128-00
KAIG3-RFI-CO-S-1127 00 KAIG3-RFI-CO-S-1127-00
KAIG3-RFI-CO-S-1126 00 KAIG3-RFI-CO-S-1126-00
KAIG3-RFI-GN-SU-0777 01 KAIG3-RFI-GN-SU-0777-01
KAIG3-RFI-GN-SU-0770 01 KAIG3-RFI-GN-SU-0770-01
KAIG3-RFI-GN-LS-0055 01 KAIG3-RFI-GN-LS-0055-01
KAIG3-RFI-TT-LC-0034 03 KAIG3-RFI-TT-LC-0034-03
KAIG3-RFI-TB-LC-0068 00 KAIG3-RFI-TB-LC-0068-00
KAIG3-RFI-GN-S-1109 00 KAIG3-RFI-GN-S-1109-00
KAIG3-RFI-GN-S-1108 00 KAIG3-RFI-GN-S-1108-00
KAIG3-RFI-BO-S-1112 00 KAIG3-RFI-BO-S-1112-00
KAIG3-RFI-BO-S-1111 00 KAIG3-RFI-BO-S-1111-00
KAIG3-RFI-BO-S-1110 00 KAIG3-RFI-BO-S-1110-00
KAIG3-RFI-TB-S-1117 00 KAIG3-RFI-TB-S-1117-00
KAIG3-RFI-CO-S-1116 00 KAIG3-RFI-CO-S-1116-00
KAIG3-RFI-CO-S-1115 00 KAIG3-RFI-CO-S-1115-00
KAIG3-RFI-CO-S-1114 00 KAIG3-RFI-CO-S-1114-00
KAIG3-RFI-CO-S-1113 00 KAIG3-RFI-CO-S-1113-00
KAIG3-RFI-BO-A-0232 02 KAIG3-RFI-BO-A-0232-02
KAIG3-RFI-TB-S-1104 00 KAIG3-RFI-TB-S-1104-00
KAIG3-RFI-TB-S-1100 00 KAIG3-RFI-TB-S-1100-00
KAIG3-RFI-GN-S-0991 01 KAIG3-RFI-GN-S-0991-01
KAIG3-RFI-TB-S-1101 00 KAIG3-RFI-TB-S-1101-00
KAIG3-RFI-TB-S-1102 00 KAIG3-RFI-TB-S-1102-00
KAIG3-RFI-BO-A-0235 01 KAIG3-RFI-BO-A-0235-01
KAIG3-RFI-TB-S-1103 00 KAIG3-RFI-TB-S-1103-00
KAIG3-RFI-TB-S-1105 00 KAIG3-RFI-TB-S-1105-00
KAIG3-RFI-TB-S-1106 00 KAIG3-RFI-TB-S-1106-00
KAIG3-RFI-TB-S-1107 00 KAIG3-RFI-TB-S-1107-00
KAIG3-RFI-GN-SU-0815 00 KAIG3-RFI-GN-SU-0815-00
KAIG3-RFI-MB-S-1098 00 KAIG3-RFI-MB-S-1098-00
KAIG3-RFI-MB-S-1094 00 KAIG3-RFI-MB-S-1094-00
KAIG3-RFI-MB-S-1095 00 KAIG3-RFI-MB-S-1095-00
KAIG3-RFI-MB-S-1096 00 KAIG3-RFI-MB-S-1096-00
KAIG3-RFI-MB-S-1097 00 KAIG3-RFI-MB-S-1097-00
KAIG3-RFI-TT-A-0241 00 KAIG3-RFI-TT-A-0241-00
KAIG3-RFI-BO-E-0072 00 KAIG3-RFI-BO-E-0072-00
KAIG3-RFI-BO-LC-0067 00 KAIG3-RFI-BO-LC-0067-00
KAIG3-RFI-CO-S-1099 00 KAIG3-RFI-CO-S-1099-00
KAIG3-RFI-CO-GE-0422 00 KAIG3-RFI-CO-GE-0422-00
KAIG3-RFI-TB-S-1092 00 KAIG3-RFI-TB-S-1092-00
KAIG3-RFI-BO-SU-0819 00 KAIG3-RFI-BO-SU-0819-00
KAIG3-RFI-TB-SU-0822 00 KAIG3-RFI-TB-SU-0822-00
KAIG3-RFI-BO-SU-0821 00 KAIG3-RFI-BO-SU-0821-00
KAIG3-RFI-BO-SU-0820 00 KAIG3-RFI-BO-SU-0820-00
KAIG3-RFI-BO-S-1090 00 KAIG3-RFI-BO-S-1090-00
KAIG3-RFI-BO-S-1089 00 KAIG3-RFI-BO-S-1089-00
KAIG3-RFI-GN-LS-0063 00 KAIG3-RFI-GN-LS-0063-00
KAIG3-RFI-GN-LS-0064 00 KAIG3-RFI-GN-LS-0064-00
KAIG3-RFI-GN-LS-0065 00 KAIG3-RFI-GN-LS-0065-00
KAIG3-RFI-GN-LS-0066 00 KAIG3-RFI-GN-LS-0066-00
KAIG3-RFI-GN-LS-0067 00 KAIG3-RFI-GN-LS-0067-00
KAIG3-RFI-TB-LC-0066 00 KAIG3-RFI-TB-LC-0066-00
KAIG3-RFI-TB-LC-0065 00 KAIG3-RFI-TB-LC-0065-00
KAIG3-RFI-BO-S-1087 00 KAIG3-RFI-BO-S-1087-00
KAIG3-RFI-TB-E-0071 00 KAIG3-RFI-TB-E-0071-00
KAIG3-RFI-BO-S-1085 00 KAIG3-RFI-BO-S-1085-00
KAIG3-RFI-BO-S-1086 00 KAIG3-RFI-BO-S-1086-00
KAIG3-RFI-BO-S-1084 00 KAIG3-RFI-BO-S-1084-00
KAIG3-RFI-BO-S-1082 00 KAIG3-RFI-BO-S-1082-00
KAIG3-RFI-BO-S-1079 00 KAIG3-RFI-BO-S-1079-00
KAIG3-RFI-BO-S-1081 00 KAIG3-RFI-BO-S-1081-00
KAIG3-RFI-MB-S-1068 00 KAIG3-RFI-MB-S-1068-00
KAIG3-RFI-MB-S-1067 00 KAIG3-RFI-MB-S-1067-00
KAIG3-RFI-MB-S-1071 00 KAIG3-RFI-MB-S-1071-00
KAIG3-RFI-TT-A-0226 02 KAIG3-RFI-TT-A-0226-02
KAIG3-RFI-CO-S-1083 00 KAIG3-RFI-CO-S-1083-00
KAIG3-RFI-CO-SU-0818 00 KAIG3-RFI-CO-SU-0818-00
KAIG3-RFI-BO-S-1078 00 KAIG3-RFI-BO-S-1078-00
KAIG3-RFI-TB-S-1063 00 KAIG3-RFI-TB-S-1063-00
KAIG3-RFI-TB-SU-0814 00 KAIG3-RFI-TB-SU-0814-00
KAIG3-RFI-BO-SU-0813 00 KAIG3-RFI-BO-SU-0813-00
KAIG3-RFI-CO-S-1077-00 00 KAIG3-RFI-CO-S-1077-00-00
KAIG3-RFI-CO-S-1076 00 KAIG3-RFI-CO-S-1076-00
KAIG3-RFI-CO-S-1075 00 KAIG3-RFI-CO-S-1075-00
KAIG3-RFI-CO-S-1074 00 KAIG3-RFI-CO-S-1074-00
KAIG3-RFI-CO-S-1073 00 KAIG3-RFI-CO-S-1073-00
KAIG3-RFI-CO-S-1072 00 KAIG3-RFI-CO-S-1072-00
KAIG3-RFI-CO-SU-0816 00 KAIG3-RFI-CO-SU-0816-00
KAIG3-RFI-CO-GE-0421 00 KAIG3-RFI-CO-GE-0421-00
KAIG3-RFI-MB-S-1035 00 KAIG3-RFI-MB-S-1035-00
KAIG3-RFI-MB-S-1066 00 KAIG3-RFI-MB-S-1066-00
KAIG3-RFI-MB-S-1065 00 KAIG3-RFI-MB-S-1065-00
KAIG3-RFI-MB-S-1069 00 KAIG3-RFI-MB-S-1069-00
KAIG3-RFI-MB-S-1070 00 KAIG3-RFI-MB-S-1070-00
KAIG3-RFI-GN-LS-0061 00 KAIG3-RFI-GN-LS-0061-00
KAIG3-RFI-FC-A-0231 00 KAIG3-RFI-FC-A-0231-00
KAIG3-RFI-GN-S-0726 01 KAIG3-RFI-GN-S-0726-01
KAIG3-RFI-MB-A-0240 00 KAIG3-RFI-MB-A-0240-00
KAIG3-RFI-BO-SU-0812 00 KAIG3-RFI-BO-SU-0812-00
KAIG3-RFI-GN-SU-0811 00 KAIG3-RFI-GN-SU-0811-00
KAIG3-RFI-GN-LS-0062 00 KAIG3-RFI-GN-LS-0062-00
KAIG3-RFI-TT-A-0239 00 KAIG3-RFI-TT-A-0239-00
KAIG3-RFI-BO-A-0236 01 KAIG3-RFI-BO-A-0236-01
KAIG3-RFI-BO-A-0233 01 KAIG3-RFI-BO-A-0233-01
KAIG3-RFI-BO-S-1052 00 KAIG3-RFI-BO-S-1052-00
KAIG3-RFI-BO-S-1051 00 KAIG3-RFI-BO-S-1051-00
KAIG3-RFI-BO-A-0238 00 KAIG3-RFI-BO-A-0238-00
KAIG3-RFI-BO-S-1057 00 KAIG3-RFI-BO-S-1057-00
KAIG3-RFI-BO-S-1055 00 KAIG3-RFI-BO-S-1055-00
KAIG3-RFI-FC-A-0237 00 KAIG3-RFI-FC-A-0237-00
KAIG3-RFI-BO-SU-0810 00 KAIG3-RFI-BO-SU-0810-00
KAIG3-RFI-BO-S-1028 00 KAIG3-RFI-BO-S-1028-00
KAIG3-RFI-TB-E-0070 00 KAIG3-RFI-TB-E-0070-00
KAIG3-RFI-MB-SU-0809 00 KAIG3-RFI-MB-SU-0809-00
KAIG3-RFI-MB-SU-0808 00 KAIG3-RFI-MB-SU-0808-00
KAIG3-RFI-MB-S-1038 00 KAIG3-RFI-MB-S-1038-00
KAIG3-RFI-GN-SU-0805 00 KAIG3-RFI-GN-SU-0805-00
KAIG3-RFI-GN-SU-0807 00 KAIG3-RFI-GN-SU-0807-00
KAIG3-RFI-GN-SU-0806 00 KAIG3-RFI-GN-SU-0806-00
KAIG3-RFI-GN-SU-0801 00 KAIG3-RFI-GN-SU-0801-00
KAIG3-RFI-GN-SU-0804 00 KAIG3-RFI-GN-SU-0804-00
KAIG3-RFI-GN-SU-0803 00 KAIG3-RFI-GN-SU-0803-00
KAIG3-RFI-GN-SU-0802 00 KAIG3-RFI-GN-SU-0802-00
KAIG3-RFI-TB-S-1047 00 KAIG3-RFI-TB-S-1047-00
KAIG3-RFI-BO-SU-0799 00 KAIG3-RFI-BO-SU-0799-00
KAIG3-RFI-TB-S-1041 00 KAIG3-RFI-TB-S-1041-00
KAIG3-RFI-BO-S-1053 00 KAIG3-RFI-BO-S-1053-00
KAIG3-RFI-BO-S-1054 00 KAIG3-RFI-BO-S-1054-00
KAIG3-RFI-CO-S-1056 00 KAIG3-RFI-CO-S-1056-00
KAIG3-RFI-PT-SU-0800 00 KAIG3-RFI-PT-SU-0800-00
KAIG3-RFI-TB-SU-0797 00 KAIG3-RFI-TB-SU-0797-00
KAIG3-RFI-TB-S-1050 00 KAIG3-RFI-TB-S-1050-00
KAIG3-RFI-TB-S-1049 00 KAIG3-RFI-TB-S-1049-00
KAIG3-RFI-TB-S-1040 00 KAIG3-RFI-TB-S-1040-00
KAIG3-RFI-TB-S-1046 00 KAIG3-RFI-TB-S-1046-00
KAIG3-RFI-CO-S-1045 00 KAIG3-RFI-CO-S-1045-00
KAIG3-RFI-CO-S-1044 00 KAIG3-RFI-CO-S-1044-00
KAIG3-RFI-CO-S-1043 00 KAIG3-RFI-CO-S-1043-00
KAIG3-RFI-CO-SU-0798 00 KAIG3-RFI-CO-SU-0798-00
KAIG3-RFI-BO-LC-0064 00 KAIG3-RFI-BO-LC-0064-00
KAIG3-RFI-BO-E-0069 00 KAIG3-RFI-BO-E-0069-00
KAIG3-RFI-BO-S-0833 01 KAIG3-RFI-BO-S-0833-01
KAIG3-RFI-BO-SU-0792 00 KAIG3-RFI-BO-SU-0792-00
KAIG3-RFI-BO-S-1027 00 KAIG3-RFI-BO-S-1027-00
KAIG3-RFI-BO-S-1026 00 KAIG3-RFI-BO-S-1026-00
KAIG3-RFI-BO-S-1031 00 KAIG3-RFI-BO-S-1031-00
KAIG3-RFI-BO-S-1032 00 KAIG3-RFI-BO-S-1032-00
KAIG3-RFI-MB-SU-0795 00 KAIG3-RFI-MB-SU-0795-00
KAIG3-RFI-MB-S-1034 00 KAIG3-RFI-MB-S-1034-00
KAIG3-RFI-MB-SU-0796 00 KAIG3-RFI-MB-SU-0796-00
KAIG3-RFI-MB-S-1033 00 KAIG3-RFI-MB-S-1033-00
KAIG3-RFI-MB-S-1036 00 KAIG3-RFI-MB-S-1036-00
KAIG3-RFI-MB-S-1037 00 KAIG3-RFI-MB-S-1037-00
KAIG3-RFI-PT-S-1039 00 KAIG3-RFI-PT-S-1039-00
KAIG3-RFI-BO-S-1022 00 KAIG3-RFI-BO-S-1022-00
KAIG3-RFI-BO-S-1023 00 KAIG3-RFI-BO-S-1023-00
KAIG3-RFI-BO-S-1024 00 KAIG3-RFI-BO-S-1024-00
KAIG3-RFI-BO-S-1025 00 KAIG3-RFI-BO-S-1025-00
KAIG3-RFI-BO-E-0068 00 KAIG3-RFI-BO-E-0068-00
KAIG3-RFI-BO-LC-0063 00 KAIG3-RFI-BO-LC-0063-00
KAIG3-RFI-GN-S-1030 00 KAIG3-RFI-GN-S-1030-00
KAIG3-RFI-GN-S-1029 00 KAIG3-RFI-GN-S-1029-00
KAIG3-RFI-PT-LC-0062 00 KAIG3-RFI-PT-LC-0062-00
KAIG3-RFI-GN-SU-0794 00 KAIG3-RFI-GN-SU-0794-00
KAIG3-RFI-PT-LC-0061 00 KAIG3-RFI-PT-LC-0061-00
KAIG3-RFI-GN-SU-0791 00 KAIG3-RFI-GN-SU-0791-00
KAIG3-RFI-GN-SU-0777 00 KAIG3-RFI-GN-SU-0777-00
KAIG3-RFI-GN-SU-0770 00 KAIG3-RFI-GN-SU-0770-00
KAIG3-RFI-GN-SU-0793 00 KAIG3-RFI-GN-SU-0793-00
KAIG3-RFI-PT-E-0067 00 KAIG3-RFI-PT-E-0067-00
KAIG3-RFI-PT-E-0066 00 KAIG3-RFI-PT-E-0066-00
KAIG3-RFI-CO-S-0996 01 KAIG3-RFI-CO-S-0996-01
KAIG3-RFI-CO-S-0995 01 KAIG3-RFI-CO-S-0995-01
KAIG3-RFI-CO-SU-0778 01 KAIG3-RFI-CO-SU-0778-01
KAIG3-RFI-PT-P-0039 00 KAIG3-RFI-PT-P-0039-00
KAIG3-RFI-GN-LS-0060 00 KAIG3-RFI-GN-LS-0060-00
KAIG3-RFI-TB-S-1021 00 KAIG3-RFI-TB-S-1021-00
KAIG3-RFI-TB-S-1019 00 KAIG3-RFI-TB-S-1019-00
KAIG3-RFI-TB-S-1020 00 KAIG3-RFI-TB-S-1020-00
KAIG3-RFI-CO-S-1018 00 KAIG3-RFI-CO-S-1018-00
KAIG3-RFI-CO-S-1017 00 KAIG3-RFI-CO-S-1017-00
KAIG3-RFI-CO-SU-0790 00 KAIG3-RFI-CO-SU-0790-00
KAIG3-RFI-PT-E-0065 00 KAIG3-RFI-PT-E-0065-00
KAIG3-RFI-PT-E-0064 00 KAIG3-RFI-PT-E-0064-00
KAIG3-RFI-PT-LC-0060 00 KAIG3-RFI-PT-LC-0060-00
KAIG3-RFI-PT-LC-0059 00 KAIG3-RFI-PT-LC-0059-00
KAIG3-RFI-PT-P-0038 00 KAIG3-RFI-PT-P-0038-00
KAIG3-RFI-PT-P-0037 00 KAIG3-RFI-PT-P-0037-00
KAIG3-RFI-MB-S-1001 00 KAIG3-RFI-MB-S-1001-00
KAIG3-RFI-MB-SU-0788 00 KAIG3-RFI-MB-SU-0788-00
KAIG3-RFI-BO-SU-0787 00 KAIG3-RFI-BO-SU-0787-00
KAIG3-RFI-BO-SU-0786 00 KAIG3-RFI-BO-SU-0786-00
KAIG3-RFI-GN-LS-0058 00 KAIG3-RFI-GN-LS-0058-00
KAIG3-RFI-GN-S-1016 00 KAIG3-RFI-GN-S-1016-00
KAIG3-RFI-BO-S-1014 00 KAIG3-RFI-BO-S-1014-00
KAIG3-RFI-BO-S-1013 00 KAIG3-RFI-BO-S-1013-00
KAIG3-RFI-TB-S-1012 00 KAIG3-RFI-TB-S-1012-00
KAIG3-RFI-TB-S-1011 00 KAIG3-RFI-TB-S-1011-00
KAIG3-RFI-BO-S-1010 00 KAIG3-RFI-BO-S-1010-00
KAIG3-RFI-GN-SU-0756 01 KAIG3-RFI-GN-SU-0756-01
KAIG3-RFI-BO-S-1009 00 KAIG3-RFI-BO-S-1009-00
KAIG3-RFI-BO-A-0232 01 KAIG3-RFI-BO-A-0232-01
KAIG3-RFI-TB-S-1008 00 KAIG3-RFI-TB-S-1008-00
KAIG3-RFI-TB-S-1007 00 KAIG3-RFI-TB-S-1007-00
KAIG3-RFI-TB-S-1006 00 KAIG3-RFI-TB-S-1006-00
KAIG3-RFI-TB-S-1005 00 KAIG3-RFI-TB-S-1005-00
KAIG3-RFI-TB-SU-0785 00 KAIG3-RFI-TB-SU-0785-00
KAIG3-RFI-TB-SU-0784 00 KAIG3-RFI-TB-SU-0784-00
KAIG3-RFI-CO-S-1015 00 KAIG3-RFI-CO-S-1015-00
KAIG3-RFI-PT-P-0036 00 KAIG3-RFI-PT-P-0036-00
KAIG3-RFI-BO-A-0232 00 KAIG3-RFI-BO-A-0232-00
KAIG3-RFI-MB-P-0035 00 KAIG3-RFI-MB-P-0035-00
KAIG3-RFI-TT-P-0034 00 KAIG3-RFI-TT-P-0034-00
KAIG3-RFI-BO-E-0063 00 KAIG3-RFI-BO-E-0063-00
KAIG3-RFI-BO-LC-0058 00 KAIG3-RFI-BO-LC-0058-00
KAIG3-RFI-CO-S-1004 00 KAIG3-RFI-CO-S-1004-00
KAIG3-RFI-CO-S-1003 00 KAIG3-RFI-CO-S-1003-00
KAIG3-RFI-CO-SU-0783 00 KAIG3-RFI-CO-SU-0783-00
KAIG3-RFI-MB-S-1000 00 KAIG3-RFI-MB-S-1000-00
KAIG3-RFI-GN-SU-0782 00 KAIG3-RFI-GN-SU-0782-00
KAIG3-RFI-GN-SU-0781 00 KAIG3-RFI-GN-SU-0781-00
KAIG3-RFI-GN-SU-0780 00 KAIG3-RFI-GN-SU-0780-00
KAIG3-RFI-GN-SU-0779 00 KAIG3-RFI-GN-SU-0779-00
KAIG3-RFI-BO-S-0999 00 KAIG3-RFI-BO-S-0999-00
KAIG3-RFI-PT-S-0998 00 KAIG3-RFI-PT-S-0998-00
KAIG3-RFI-BO-S-0997 00 KAIG3-RFI-BO-S-0997-00
KAIG3-RFI-TB-P-0033 00 KAIG3-RFI-TB-P-0033-00
KAIG3-RFI-GN-LS-0056 00 KAIG3-RFI-GN-LS-0056-00
KAIG3-RFI-BO-S-0989 00 KAIG3-RFI-BO-S-0989-00
KAIG3-RFI-BO-S-0990 00 KAIG3-RFI-BO-S-0990-00
KAIG3-RFI-BO-SU-0776 00 KAIG3-RFI-BO-SU-0776-00
KAIG3-RFI-BO-SU-0775 00 KAIG3-RFI-BO-SU-0775-00
KAIG3-RFI-TB-SU-0774 00 KAIG3-RFI-TB-SU-0774-00
KAIG3-RFI-MB-E-0062 00 KAIG3-RFI-MB-E-0062-00
KAIG3-RFI-TB-S-0993 00 KAIG3-RFI-TB-S-0993-00
KAIG3-RFI-CO-S-0996 00 KAIG3-RFI-CO-S-0996-00
KAIG3-RFI-TB-S-0987 00 KAIG3-RFI-TB-S-0987-00
KAIG3-RFI-CO-S-0995 00 KAIG3-RFI-CO-S-0995-00
KAIG3-RFI-BO-SU-0773 00 KAIG3-RFI-BO-SU-0773-00
KAIG3-RFI-CO-SU-0778 00 KAIG3-RFI-CO-SU-0778-00
KAIG3-RFI-TB-S-0988 00 KAIG3-RFI-TB-S-0988-00
KAIG3-RFI-BO-S-0986 00 KAIG3-RFI-BO-S-0986-00
KAIG3-RFI-PR-SU-0707 01 KAIG3-RFI-PR-SU-0707-01
KAIG3-RFI-GN-S-0991 00 KAIG3-RFI-GN-S-0991-00
KAIG3-RFI-GN-S-0985 00 KAIG3-RFI-GN-S-0985-00
KAIG3-RFI-GN-LS-0057 00 KAIG3-RFI-GN-LS-0057-00
KAIG3-RFI-GN-S-0994 00 KAIG3-RFI-GN-S-0994-00
KAIG3-RFI-GN-S-0992 00 KAIG3-RFI-GN-S-0992-00
KAIG3-RFI-TB-E-0061 00 KAIG3-RFI-TB-E-0061-00
KAIG3-RFI-TB-SU-0772 00 KAIG3-RFI-TB-SU-0772-00
KAIG3-RFI-PT-S-0983 00 KAIG3-RFI-PT-S-0983-00
KAIG3-RFI-GN-S-0984 00 KAIG3-RFI-GN-S-0984-00
KAIG3-RFI-MB-S-0979 00 KAIG3-RFI-MB-S-0979-00
KAIG3-RFI-TB-S-0980 00 KAIG3-RFI-TB-S-0980-00
KAIG3-RFI-TB-S-0981 00 KAIG3-RFI-TB-S-0981-00
KAIG3-RFI-MB-S-0978 00 KAIG3-RFI-MB-S-0978-00
KAIG3-RFI-CO-S-0982 00 KAIG3-RFI-CO-S-0982-00
KAIG3-RFI-CO-S-0977 00 KAIG3-RFI-CO-S-0977-00
KAIG3-RFI-GN-SU-0757 00 KAIG3-RFI-GN-SU-0757-00
KAIG3-RFI-CO-S-0976 00 KAIG3-RFI-CO-S-0976-00
KAIG3-RFI-CO-SU-0771 00 KAIG3-RFI-CO-SU-0771-00
KAIG3-RFI-MB-SU-0768 00 KAIG3-RFI-MB-SU-0768-00
KAIG3-RFI-MB-SU-0690 00 KAIG3-RFI-MB-SU-0690-00
KAIG3-RFI-BO-S-0971 00 KAIG3-RFI-BO-S-0971-00
KAIG3-RFI-BO-S-0972 00 KAIG3-RFI-BO-S-0972-00
KAIG3-RFI-BO-S-0973 00 KAIG3-RFI-BO-S-0973-00
KAIG3-RFI-BO-S-0974 00 KAIG3-RFI-BO-S-0974-00
KAIG3-RFI-BO-SU-0769 00 KAIG3-RFI-BO-SU-0769-00
KAIG3-RFI-BO-S-0975 00 KAIG3-RFI-BO-S-0975-00
KAIG3-RFI-BO-LC-0057 00 KAIG3-RFI-BO-LC-0057-00
KAIG3-RFI-GN-LS-0052 00 KAIG3-RFI-GN-LS-0052-00
KAIG3-RFI-MB-LC-0023 01 KAIG3-RFI-MB-LC-0023-01
KAIG3-RFI-GN-LS-0053 00 KAIG3-RFI-GN-LS-0053-00
KAIG3-RFI-BO-E-0060 00 KAIG3-RFI-BO-E-0060-00
KAIG3-RFI-GN-LS-0054 00 KAIG3-RFI-GN-LS-0054-00
KAIG3-RFI-GN-LS-0055 00 KAIG3-RFI-GN-LS-0055-00
KAIG3-RFI-MB-S-0964 00 KAIG3-RFI-MB-S-0964-00
KAIG3-RFI-MB-S-0965 00 KAIG3-RFI-MB-S-0965-00
KAIG3-RFI-MB-S-0966 00 KAIG3-RFI-MB-S-0966-00
KAIG3-RFI-MB-S-0967 00 KAIG3-RFI-MB-S-0967-00
KAIG3-RFI-MB-S-0968 00 KAIG3-RFI-MB-S-0968-00
KAIG3-RFI-FC-S-0963 00 KAIG3-RFI-FC-S-0963-00
KAIG3-RFI-MB-S-0970 00 KAIG3-RFI-MB-S-0970-00
KAIG3-RFI-MB-S-0969 00 KAIG3-RFI-MB-S-0969-00
KAIG3-RFI-TB-E-0059 00 KAIG3-RFI-TB-E-0059-00
KAIG3-RFI-TB-LC-0056 00 KAIG3-RFI-TB-LC-0056-00
KAIG3-RFI-BO-SU-0725 00 KAIG3-RFI-BO-SU-0725-00
KAIG3-RFI-BO-S-0961 00 KAIG3-RFI-BO-S-0961-00
KAIG3-RFI-BO-S-0962 00 KAIG3-RFI-BO-S-0962-00
KAIG3-RFI-GN-LS-0047 01 KAIG3-RFI-GN-LS-0047-01
KAIG3-RFI-GN-LS-0050 00 KAIG3-RFI-GN-LS-0050-00
KAIG3-RFI-GN-LS-0045 01 KAIG3-RFI-GN-LS-0045-01
KAIG3-RFI-GN-LS-0045 00 KAIG3-RFI-GN-LS-0045-00
KAIG3-RFI-GN-LS-0046 01 KAIG3-RFI-GN-LS-0046-01
KAIG3-RFI-GN-LS-0046 00 KAIG3-RFI-GN-LS-0046-00
KAIG3-RFI-GN-LS-0049 00 KAIG3-RFI-GN-LS-0049-00
KAIG3-RFI-GN-LS-0044 01 KAIG3-RFI-GN-LS-0044-01
KAIG3-RFI-GN-LS-0035 02 KAIG3-RFI-GN-LS-0035-02
KAIG3-RFI-TB-S-0851 01 KAIG3-RFI-TB-S-0851-01
KAIG3-RFI-TB-S-0850 01 KAIG3-RFI-TB-S-0850-01
KAIG3-RFI-TB-S-0849 01 KAIG3-RFI-TB-S-0849-01
KAIG3-RFI-BO-S-0954 00 KAIG3-RFI-BO-S-0954-00
KAIG3-RFI-BO-S-0909 00 KAIG3-RFI-BO-S-0909-00
KAIG3-RFI-MB-S-0956 00 KAIG3-RFI-MB-S-0956-00
KAIG3-RFI-BO-S-0955 00 KAIG3-RFI-BO-S-0955-00
KAIG3-RFI-GN-SU-0765 00 KAIG3-RFI-GN-SU-0765-00
KAIG3-RFI-GN-SU-0766 00 KAIG3-RFI-GN-SU-0766-00
KAIG3-RFI-BO-S-0958 00 KAIG3-RFI-BO-S-0958-00
KAIG3-RFI-BO-SU-0767 00 KAIG3-RFI-BO-SU-0767-00
KAIG3-RFI-BO-S-0959 00 KAIG3-RFI-BO-S-0959-00
KAIG3-RFI-BO-GE-0420 00 KAIG3-RFI-BO-GE-0420-00
KAIG3-RFI-BO-A-0229 01 KAIG3-RFI-BO-A-0229-01
KAIG3-RFI-CO-S-0960 00 KAIG3-RFI-CO-S-0960-00
KAIG3-RFI-TB-P-0032 00 KAIG3-RFI-TB-P-0032-00
KAIG3-RFI-BO-SU-0764 00 KAIG3-RFI-BO-SU-0764-00
KAIG3-RFI-BO-S-0953 00 KAIG3-RFI-BO-S-0953-00
KAIG3-RFI-BO-S-0897 00 KAIG3-RFI-BO-S-0897-00
KAIG3-RFI-BO-S-0883 00 KAIG3-RFI-BO-S-0883-00
KAIG3-RFI-TB-S-0880 00 KAIG3-RFI-TB-S-0880-00
KAIG3-RFI-BO-SU-0762 00 KAIG3-RFI-BO-SU-0762-00
KAIG3-RFI-BO-S-0942 00 KAIG3-RFI-BO-S-0942-00
KAIG3-RFI-CO-S-0938 00 KAIG3-RFI-CO-S-0938-00
KAIG3-RFI-TB-S-0948 00 KAIG3-RFI-TB-S-0948-00
KAIG3-RFI-TB-SU-0675 01 KAIG3-RFI-TB-SU-0675-01
KAIG3-RFI-TB-SU-0761 00 KAIG3-RFI-TB-SU-0761-00
KAIG3-RFI-BO-S-0952 00 KAIG3-RFI-BO-S-0952-00
KAIG3-RFI-MB-S-0949 00 KAIG3-RFI-MB-S-0949-00
KAIG3-RFI-MB-SU-0763 00 KAIG3-RFI-MB-SU-0763-00
KAIG3-RFI-MB-S-0951 00 KAIG3-RFI-MB-S-0951-00
KAIG3-RFI-MB-S-0950 00 KAIG3-RFI-MB-S-0950-00
KAIG3-RFI-TB-S-0947 00 KAIG3-RFI-TB-S-0947-00
KAIG3-RFI-BO-A-0235 00 KAIG3-RFI-BO-A-0235-00
KAIG3-RFI-BO-A-0236 00 KAIG3-RFI-BO-A-0236-00
KAIG3-RFI-TB-S-0943 00 KAIG3-RFI-TB-S-0943-00
KAIG3-RFI-TB-S-0944 00 KAIG3-RFI-TB-S-0944-00
KAIG3-RFI-TB-S-0945 00 KAIG3-RFI-TB-S-0945-00
KAIG3-RFI-TB-S-0946 00 KAIG3-RFI-TB-S-0946-00
KAIG3-RFI-BO-E-0058 00 KAIG3-RFI-BO-E-0058-00
KAIG3-RFI-CO-S-0941 00 KAIG3-RFI-CO-S-0941-00
KAIG3-RFI-TT-P-0031 00 KAIG3-RFI-TT-P-0031-00
KAIG3-RFI-TT-A-0234 00 KAIG3-RFI-TT-A-0234-00
KAIG3-RFI-BO-LC-0055 00 KAIG3-RFI-BO-LC-0055-00
KAIG3-RFI-GN-S-0614 01 KAIG3-RFI-GN-S-0614-01
KAIG3-RFI-GN-LS-0048 00 KAIG3-RFI-GN-LS-0048-00
KAIG3-RFI-BO-S-0940 00 KAIG3-RFI-BO-S-0940-00
KAIG3-RFI-BG-GE-0419 00 KAIG3-RFI-BG-GE-0419-00
KAIG3-RFI-BG-SU-0760 00 KAIG3-RFI-BG-SU-0760-00
KAIG3-RFI-TB-GE-0418 00 KAIG3-RFI-TB-GE-0418-00
KAIG3-RFI-WG-GE-0417 00 KAIG3-RFI-WG-GE-0417-00
KAIG3-RFI-TB-SU-0759 00 KAIG3-RFI-TB-SU-0759-00
KAIG3-RFI-WG-SU-0758 00 KAIG3-RFI-WG-SU-0758-00
KAIG3-RFI-BO-S-0939 00 KAIG3-RFI-BO-S-0939-00
KAIG3-RFI-BO-A-0225 01 KAIG3-RFI-BO-A-0225-01
KAIG3-RFI-BO-S-0935 00 KAIG3-RFI-BO-S-0935-00
KAIG3-RFI-BO-S-0936 00 KAIG3-RFI-BO-S-0936-00
KAIG3-RFI-BO-S-0937 00 KAIG3-RFI-BO-S-0937-00
KAIG3-RFI-CO-S-0933 00 KAIG3-RFI-CO-S-0933-00
KAIG3-RFI-GN-SU-0756 00 KAIG3-RFI-GN-SU-0756-00
KAIG3-RFI-PT-E-0057 00 KAIG3-RFI-PT-E-0057-00
KAIG3-RFI-PT-LC-0054 00 KAIG3-RFI-PT-LC-0054-00
KAIG3-RFI-BO-SU-0755 00 KAIG3-RFI-BO-SU-0755-00
KAIG3-RFI-BO-S-0930 00 KAIG3-RFI-BO-S-0930-00
KAIG3-RFI-BO-S-0929 00 KAIG3-RFI-BO-S-0929-00
KAIG3-RFI-FC-S-0852 01 KAIG3-RFI-FC-S-0852-01
KAIG3-RFI-MB-S-0932 00 KAIG3-RFI-MB-S-0932-00
KAIG3-RFI-MB-S-0931 00 KAIG3-RFI-MB-S-0931-00
KAIG3-RFI-BO-A-0233 00 KAIG3-RFI-BO-A-0233-00
KAIG3-RFI-TT-LC-0034 02 KAIG3-RFI-TT-LC-0034-02
KAIG3-RFI-CO-GE-0416 00 KAIG3-RFI-CO-GE-0416-00
KAIG3-RFI-CO-GE-0415 00 KAIG3-RFI-CO-GE-0415-00
KAIG3-RFI-CO-GE-0411 00 KAIG3-RFI-CO-GE-0411-00
KAIG3-RFI-CO-GE-0410 00 KAIG3-RFI-CO-GE-0410-00
KAIG3-RFI-MB-S-0918 00 KAIG3-RFI-MB-S-0918-00
KAIG3-RFI-MB-S-0923 00 KAIG3-RFI-MB-S-0923-00
KAIG3-RFI-TB-S-0914 00 KAIG3-RFI-TB-S-0914-00
KAIG3-RFI-TB-S-0913 00 KAIG3-RFI-TB-S-0913-00
KAIG3-RFI-BO-S-0925 00 KAIG3-RFI-BO-S-0925-00
KAIG3-RFI-TB-S-0916 00 KAIG3-RFI-TB-S-0916-00
KAIG3-RFI-CO-S-0928 00 KAIG3-RFI-CO-S-0928-00
KAIG3-RFI-MB-S-0924 00 KAIG3-RFI-MB-S-0924-00
KAIG3-RFI-CO-S-0927 00 KAIG3-RFI-CO-S-0927-00
KAIG3-RFI-CO-SU-0754 00 KAIG3-RFI-CO-SU-0754-00
KAIG3-RFI-MB-S-0919 00 KAIG3-RFI-MB-S-0919-00
KAIG3-RFI-TB-SU-0752 00 KAIG3-RFI-TB-SU-0752-00
KAIG3-RFI-TB-S-0926 00 KAIG3-RFI-TB-S-0926-00
KAIG3-RFI-CO-S-0922 00 KAIG3-RFI-CO-S-0922-00
KAIG3-RFI-CO-S-0921 00 KAIG3-RFI-CO-S-0921-00
KAIG3-RFI-CO-SU-0751 00 KAIG3-RFI-CO-SU-0751-00
KAIG3-RFI-CO-GE-0414 00 KAIG3-RFI-CO-GE-0414-00
KAIG3-RFI-FC-LC-0053 00 KAIG3-RFI-FC-LC-0053-00
KAIG3-RFI-BO-LC-0052 00 KAIG3-RFI-BO-LC-0052-00
KAIG3-RFI-TT-A-0226 01 KAIG3-RFI-TT-A-0226-01
KAIG3-RFI-GN-SU-0748 00 KAIG3-RFI-GN-SU-0748-00
KAIG3-RFI-GN-LS-0047 00 KAIG3-RFI-GN-LS-0047-00
KAIG3-RFI-GN-S-0915 00 KAIG3-RFI-GN-S-0915-00
KAIG3-RFI-MB-S-0917 00 KAIG3-RFI-MB-S-0917-00
KAIG3-RFI-MB-SU-0749 00 KAIG3-RFI-MB-SU-0749-00
KAIG3-RFI-MB-SU-0750 00 KAIG3-RFI-MB-SU-0750-00
KAIG3-RFI-GN-SU-0746 00 KAIG3-RFI-GN-SU-0746-00
KAIG3-RFI-BO-S-0912 00 KAIG3-RFI-BO-S-0912-00
KAIG3-RFI-BO-SU-0747 00 KAIG3-RFI-BO-SU-0747-00
KAIG3-RFI-CO-GE-0409 00 KAIG3-RFI-CO-GE-0409-00
KAIG3-RFI-CO-GE-0413 00 KAIG3-RFI-CO-GE-0413-00
KAIG3-RFI-CO-GE-0408 00 KAIG3-RFI-CO-GE-0408-00
KAIG3-RFI-CO-GE-0407 00 KAIG3-RFI-CO-GE-0407-00
KAIG3-RFI-CO-GE-0406 00 KAIG3-RFI-CO-GE-0406-00
KAIG3-RFI-CO-GE-0412 00 KAIG3-RFI-CO-GE-0412-00
KAIG3-RFI-CO-GE-0405 00 KAIG3-RFI-CO-GE-0405-00
KAIG3-RFI-CO-GE-0404 00 KAIG3-RFI-CO-GE-0404-00
KAIG3-RFI-CO-GE-0403 00 KAIG3-RFI-CO-GE-0403-00
KAIG3-RFI-CO-GE-402 00 KAIG3-RFI-CO-GE-402-00
KAIG3-RFI-CO-GE-0401 00 KAIG3-RFI-CO-GE-0401-00
KAIG3-RFI-CO-GE-0400 00 KAIG3-RFI-CO-GE-0400-00
KAIG3-RFI-CO-GE-0399 00 KAIG3-RFI-CO-GE-0399-00
KAIG3-RFI-CO-GE-0398 00 KAIG3-RFI-CO-GE-0398-00
KAIG3-RFI-CO-GE-0397 00 KAIG3-RFI-CO-GE-0397-00
KAIG3-RFI-CO-GE-0396 00 KAIG3-RFI-CO-GE-0396-00
KAIG3-RFI-CO-SU-0744 00 KAIG3-RFI-CO-SU-0744-00
KAIG3-RFI-CO-SU-0743 00 KAIG3-RFI-CO-SU-0743-00
KAIG3-RFI-CO-S-0911 00 KAIG3-RFI-CO-S-0911-00
KAIG3-RFI-BO-E-0055 00 KAIG3-RFI-BO-E-0055-00
KAIG3-RFI-WG-SU-0741 00 KAIG3-RFI-WG-SU-0741-00
KAIG3-RFI-FC-E-0056 00 KAIG3-RFI-FC-E-0056-00
KAIG3-RFI-FC-SU-0745 00 KAIG3-RFI-FC-SU-0745-00
KAIG3-RFI-TB-S-0908 00 KAIG3-RFI-TB-S-0908-00
KAIG3-RFI-TB-S-0906 00 KAIG3-RFI-TB-S-0906-00
KAIG3-RFI-TB-S-0907 00 KAIG3-RFI-TB-S-0907-00
KAIG3-RFI-TB-S-0905 00 KAIG3-RFI-TB-S-0905-00
KAIG3-RFI-CO-SU-0742 00 KAIG3-RFI-CO-SU-0742-00
KAIG3-RFI-BG-SU-0740 00 KAIG3-RFI-BG-SU-0740-00
KAIG3-RFI-CO-GE-0395 00 KAIG3-RFI-CO-GE-0395-00
KAIG3-RFI-CO-GE-0394 00 KAIG3-RFI-CO-GE-0394-00
KAIG3-RFI-WG-GE-0393 00 KAIG3-RFI-WG-GE-0393-00
KAIG3-RFI-BG-GE-0392 00 KAIG3-RFI-BG-GE-0392-00
KAIG3-RFI-CO-S-0903 00 KAIG3-RFI-CO-S-0903-00
KAIG3-RFI-CO-S-0902 00 KAIG3-RFI-CO-S-0902-00
KAIG3-RFI-BO-S-0904 00 KAIG3-RFI-BO-S-0904-00
KAIG3-RFI-GN-SU-0737 00 KAIG3-RFI-GN-SU-0737-00
KAIG3-RFI-GN-LS-0044 00 KAIG3-RFI-GN-LS-0044-00
KAIG3-RFI-GN-LS-0035 01 KAIG3-RFI-GN-LS-0035-01
KAIG3-RFI-CO-SU-0739 00 KAIG3-RFI-CO-SU-0739-00
KAIG3-RFI-CO-SU-0738 00 KAIG3-RFI-CO-SU-0738-00
KAIG3-RFI-CO-SU-0724 00 KAIG3-RFI-CO-SU-0724-00
KAIG-RFI-CO-SU-0723 00 KAIG-RFI-CO-SU-0723-00
KAIG3-RFI-CO-SU-0722 00 KAIG3-RFI-CO-SU-0722-00
KAIG3-RFI-BO-A-0230 00 KAIG3-RFI-BO-A-0230-00
KAIG3-RFI-BO-A-0229 00 KAIG3-RFI-BO-A-0229-00
KAIG3-RFI-TB-SU-0733 00 KAIG3-RFI-TB-SU-0733-00
KAIG3-RFI-GN-LS-0043 00 KAIG3-RFI-GN-LS-0043-00
KAIG3-RFI-GN-LS-0033 01 KAIG3-RFI-GN-LS-0033-01
KAIG3-RFI-GN-S-0729 00 KAIG3-RFI-GN-S-0729-00
KAIG3-RFI-GN-S-0726 00 KAIG3-RFI-GN-S-0726-00
KAIG3-RFI-BO-S-0898 00 KAIG3-RFI-BO-S-0898-00
KAIG3-RFI-BO-S-0896 00 KAIG3-RFI-BO-S-0896-00
KAIG3-RFI-BO-SU-0736 00 KAIG3-RFI-BO-SU-0736-00
KAIG3-RFI-BO-SU-0735 00 KAIG3-RFI-BO-SU-0735-00
KAIG3-RFI-BO-SU-0734 00 KAIG3-RFI-BO-SU-0734-00
KAIG3-RFI-TB-S-0901 00 KAIG3-RFI-TB-S-0901-00
KAIG3-RFI-TB-S-0900 00 KAIG3-RFI-TB-S-0900-00
KAIG3-RFI-TB-S-0899 00 KAIG3-RFI-TB-S-0899-00
KAIG3-RFI-BO-S-0864 00 KAIG3-RFI-BO-S-0864-00
KAIG3-RFI-MB-S-0871 00 KAIG3-RFI-MB-S-0871-00
KAIG3-RFI-TB-S-0862 00 KAIG3-RFI-TB-S-0862-00
KAIG3-RFI-BO-A-0227 00 KAIG3-RFI-BO-A-0227-00
KAIG3-RFI-TB-S-0872 00 KAIG3-RFI-TB-S-0872-00
KAIG3-RFI-MB-S-0887 00 KAIG3-RFI-MB-S-0887-00
KAIG3-RFI-BO-S-0831 01 KAIG3-RFI-BO-S-0831-01
KAIG3-RFI-GN-SU-0728 00 KAIG3-RFI-GN-SU-0728-00
KAIG3-RFI-GN-SU-0727 00 KAIG3-RFI-GN-SU-0727-00
KAIG3-RFI-GN-SU-0624 01 KAIG3-RFI-GN-SU-0624-01
KAIG3-RFI-BO-A-0218 01 KAIG3-RFI-BO-A-0218-01
KAIG3-RFI-CO-S-0894 00 KAIG3-RFI-CO-S-0894-00
KAIG3-RFI-CO-S-0893 00 KAIG3-RFI-CO-S-0893-00
KAIG3-RFI-CO-SU-0732 00 KAIG3-RFI-CO-SU-0732-00
KAIG3-RFI-TB-S-0888 00 KAIG3-RFI-TB-S-0888-00
KAIG3-RFI-TB-S-0889 00 KAIG3-RFI-TB-S-0889-00
KAIG3-RFI-TB-S-0890 00 KAIG3-RFI-TB-S-0890-00
KAIG3-RFI-BO-LC-0051 00 KAIG3-RFI-BO-LC-0051-00
KAIG3-RFI-TB-E-0054 00 KAIG3-RFI-TB-E-0054-00
KAIG3-RFI-CO-S-0891 00 KAIG3-RFI-CO-S-0891-00
KAIG3-RFI-CO-SU-0731 00 KAIG3-RFI-CO-SU-0731-00
KAIG3-RFI-CO-S-0886 00 KAIG3-RFI-CO-S-0886-00
KAIG3-RFI-CO-S-0885 00 KAIG3-RFI-CO-S-0885-00
KAIG3-RFI-CO-SU-0721 00 KAIG3-RFI-CO-SU-0721-00
KAIG3-RFI-BO-S-0875 00 KAIG3-RFI-BO-S-0875-00
KAIG3-RFI-MB-S-0876 00 KAIG3-RFI-MB-S-0876-00
KAIG3-RFI-TB-S-0877 00 KAIG3-RFI-TB-S-0877-00
KAIG3-RFI-TB-S-0878 00 KAIG3-RFI-TB-S-0878-00
KAIG3-RFI-GN-SU-0720 00 KAIG3-RFI-GN-SU-0720-00
KAIG3-RFI-BO-S-0884 00 KAIG3-RFI-BO-S-0884-00
KAIG3-RFI-TB-S-0882 00 KAIG3-RFI-TB-S-0882-00
KAIG3-RFI-TB-S-0879 00 KAIG3-RFI-TB-S-0879-00
KAIG3-RFI-TB-S-0881 00 KAIG3-RFI-TB-S-0881-00
KAIG3-RFI-GN-SU-0719 00 KAIG3-RFI-GN-SU-0719-00
KAIG3-RFI-GN-SU-0718 00 KAIG3-RFI-GN-SU-0718-00
KAIG3-RFI-FC-P-0028 01 KAIG3-RFI-FC-P-0028-01
KAIG3-RFI-CO-S-0874 00 KAIG3-RFI-CO-S-0874-00
KAIG3-RFI-CO-S-0873 00 KAIG3-RFI-CO-S-0873-00
KAIG3-RFI-MB-SU-0717 00 KAIG3-RFI-MB-SU-0717-00
KAIG3-RFI-CO-GE-0390 00 KAIG3-RFI-CO-GE-0390-00
KAIG3-RFI-CO-GE-0384 00 KAIG3-RFI-CO-GE-0384-00
KAIG3-RFI-CO-GE-0391 00 KAIG3-RFI-CO-GE-0391-00
KAIG3-RFI-CO-GE-0387 00 KAIG3-RFI-CO-GE-0387-00
KAIG3-RFI-CO-GE-0385 00 KAIG3-RFI-CO-GE-0385-00
KAIG3-RFI-CO-SU-0711 00 KAIG3-RFI-CO-SU-0711-00
KAIG3-RFI-CO-SU-0710 00 KAIG3-RFI-CO-SU-0710-00
KAIG3-RFI-CO-GE-0389 00 KAIG3-RFI-CO-GE-0389-00
KAIG3-RFI-CO-GE-0388 00 KAIG3-RFI-CO-GE-0388-00
KAIG3-RFI-CO-GE-0382 00 KAIG3-RFI-CO-GE-0382-00
KAIG3-RFI-CO-GE-0383 00 KAIG3-RFI-CO-GE-0383-00
KAIG3-RFI-MB-S-0869 00 KAIG3-RFI-MB-S-0869-00
KAIG3-RFI-MB-S-0870 00 KAIG3-RFI-MB-S-0870-00
KAIG3-RFI-GN-SU-0714 00 KAIG3-RFI-GN-SU-0714-00
KAIG3-RFI-BO-S-0868 00 KAIG3-RFI-BO-S-0868-00
KAIG3-RFI-TB-S-0861 00 KAIG3-RFI-TB-S-0861-00
KAIG3-RFI-BO-S-0867 00 KAIG3-RFI-BO-S-0867-00
KAIG3-RFI-BO-SU-0715 00 KAIG3-RFI-BO-SU-0715-00
KAIG3-RFI-FC-P-0030 00 KAIG3-RFI-FC-P-0030-00
KAIG3-RFI-TT-A-0217 00 KAIG3-RFI-TT-A-0217-00
KAIG3-RFI-CO-S-0866 00 KAIG3-RFI-CO-S-0866-00
KAIG3-RFI-CO-S-0865 00 KAIG3-RFI-CO-S-0865-00
KAIG3-RFI-TT-A-0226 00 KAIG3-RFI-TT-A-0226-00
KAIG3-RFI-TB-E-0053 00 KAIG3-RFI-TB-E-0053-00
KAIG3-RFI-TB-LC-0050 00 KAIG3-RFI-TB-LC-0050-00
KAIG3-RFI-BO-A-0224 00 KAIG3-RFI-BO-A-0224-00
KAIG3-RFI-BO-A-0225 00 KAIG3-RFI-BO-A-0225-00
KAIG3-RFI-BO-S-0863 00 KAIG3-RFI-BO-S-0863-00
KAIG3-RFI-CO-SU-0702 00 KAIG3-RFI-CO-SU-0702-00
KAIG3-RFI-MB-SU-0713 00 KAIG3-RFI-MB-SU-0713-00
KAIG3-RFI-BO-S-0860 00 KAIG3-RFI-BO-S-0860-00
KAIG3-RFI-PT-P-0029 00 KAIG3-RFI-PT-P-0029-00
KAIG3-RFI-BO-E-0052 00 KAIG3-RFI-BO-E-0052-00
KAIG3-RFI-BO-LC-0049 00 KAIG3-RFI-BO-LC-0049-00
KAIG3-RFI-MB-S-0859 00 KAIG3-RFI-MB-S-0859-00
KAIG3-RFI-MB-S-0858 00 KAIG3-RFI-MB-S-0858-00
KAIG3-RFI-MB-S-0857 00 KAIG3-RFI-MB-S-0857-00
KAIG3-RFI-BO-S-0856 00 KAIG3-RFI-BO-S-0856-00
KAIG3-RFI-BO-S-0855 00 KAIG3-RFI-BO-S-0855-00
KAIG3-RFI-CO-GE-0386 00 KAIG3-RFI-CO-GE-0386-00
KAIG3-RFI-CO-S-0854 00 KAIG3-RFI-CO-S-0854-00
KAIG3-RFI-CO-S-0853 00 KAIG3-RFI-CO-S-0853-00
KAIG3-RFI-CO-SU-0712 00 KAIG3-RFI-CO-SU-0712-00
KAIG3-RFI-CO-GE-0379 00 KAIG3-RFI-CO-GE-0379-00
KAIG3-RFI-CO-SU-0701 00 KAIG3-RFI-CO-SU-0701-00
KAIG3-RFI-CO-SU-0709 00 KAIG3-RFI-CO-SU-0709-00
KAIG3-RFI-CO-GE-0378 00 KAIG3-RFI-CO-GE-0378-00
KAIG3-RFI-CO-SU-0696 00 KAIG3-RFI-CO-SU-0696-00
KAIG3-RFI-CO-SU-0695 00 KAIG3-RFI-CO-SU-0695-00
KAIG3-RFI-GN-SU-0708 00 KAIG3-RFI-GN-SU-0708-00
KAIG3-RFI-PR-SU-0707 00 KAIG3-RFI-PR-SU-0707-00
KAIG3-RFI-FC-S-0852 00 KAIG3-RFI-FC-S-0852-00
KAIG3-RFI-TB-S-0851 00 KAIG3-RFI-TB-S-0851-00
KAIG3-RFI-TB-S-0850 00 KAIG3-RFI-TB-S-0850-00
KAIG3-RFI-TB-S-0849 00 KAIG3-RFI-TB-S-0849-00
KAIG3-RFI-MB-SU-0706 00 KAIG3-RFI-MB-SU-0706-00
KAIG3-RFI-CO-S-0848 00 KAIG3-RFI-CO-S-0848-00
KAIG3-RFI-CO-SU-0705 00 KAIG3-RFI-CO-SU-0705-00
KAIG3-RFI-CO-SU-0704 00 KAIG3-RFI-CO-SU-0704-00
KAIG3-RFI-CO-SU-0703 00 KAIG3-RFI-CO-SU-0703-00
KAIG3-RFI-TB-S-0847 00 KAIG3-RFI-TB-S-0847-00
KAIG3-RFI-CO-GE-0376 00 KAIG3-RFI-CO-GE-0376-00
KAIG3-RFI-CO-GE-0377 00 KAIG3-RFI-CO-GE-0377-00
KAIG3-RFI-CO-GE-0380 00 KAIG3-RFI-CO-GE-0380-00
KAIG3-RFI-CO-GE-0381 00 KAIG3-RFI-CO-GE-0381-00
KAIG3-RFI-MB-S-0846 00 KAIG3-RFI-MB-S-0846-00
KAIG3-RFI-MB-S-0845 00 KAIG3-RFI-MB-S-0845-00
KAIG3-RFI-MB-SU-0700 00 KAIG3-RFI-MB-SU-0700-00
KAIG3-RFI-TB-SU-0699 00 KAIG3-RFI-TB-SU-0699-00
KAIG3-RFI-CO-SU-0681 01 KAIG3-RFI-CO-SU-0681-01
KAIG3-RFI-MB-S-0843 00 KAIG3-RFI-MB-S-0843-00
KAIG3-RFI-MB-S-0844 00 KAIG3-RFI-MB-S-0844-00
KAIG3-RFI-TB-SU-0698 00 KAIG3-RFI-TB-SU-0698-00
KAIG3-RFI-BO-A-0223 00 KAIG3-RFI-BO-A-0223-00
KAIG3-RFI-BO-S-0841 00 KAIG3-RFI-BO-S-0841-00
KAIG3-RFI-BO-S-0842 00 KAIG3-RFI-BO-S-0842-00
KAIG3-RFI-TB-S-0829 00 KAIG3-RFI-TB-S-0829-00
KAIG3-RFI-TB-S-0828 00 KAIG3-RFI-TB-S-0828-00
KAIG3-RFI-MB-S-0827 00 KAIG3-RFI-MB-S-0827-00
KAIG3-RFI-TB-S-0837 00 KAIG3-RFI-TB-S-0837-00
KAIG3-RFI-TB-S-0838 00 KAIG3-RFI-TB-S-0838-00
KAIG3-RFI-BO-S-0840 00 KAIG3-RFI-BO-S-0840-00
KAIG3-RFI-GN-LS-0041 00 KAIG3-RFI-GN-LS-0041-00
KAIG3-RFI-BO-SU-0692 00 KAIG3-RFI-BO-SU-0692-00
KAIG3-RFI-BO-S-0839 00 KAIG3-RFI-BO-S-0839-00
KAIG3-RFI-BO-SU-0691 00 KAIG3-RFI-BO-SU-0691-00
KAIG3-RFI-CO-SU-0694 00 KAIG3-RFI-CO-SU-0694-00
KAIG3-RFI-CO-SU-0693 00 KAIG3-RFI-CO-SU-0693-00
KAIG3-RFI-CO-GE-0374 00 KAIG3-RFI-CO-GE-0374-00
KAIG3-RFI-CO-GE-0373 00 KAIG3-RFI-CO-GE-0373-00
KAIG3-RFI-CO-S-0836 00 KAIG3-RFI-CO-S-0836-00
KAIG3-RFI-CO-S-0835 00 KAIG3-RFI-CO-S-0835-00
KAIG3-RFI-CO-SU-0688 00 KAIG3-RFI-CO-SU-0688-00
KAIG3-RFI-CO-SU-0687 00 KAIG3-RFI-CO-SU-0687-00
KAIG3-RFI-FC-P-0028 00 KAIG3-RFI-FC-P-0028-00
KAIG3-RFI-GN-S-0834 00 KAIG3-RFI-GN-S-0834-00
KAIG3-RFI-BO-S-0833 00 KAIG3-RFI-BO-S-0833-00
KAIG3-RFI-BO-S-0831 00 KAIG3-RFI-BO-S-0831-00
KAIG3-RFI-BO-S-0832 00 KAIG3-RFI-BO-S-0832-00
KAIG3-RFI-GN-LS-0039 00 KAIG3-RFI-GN-LS-0039-00
KAIG3-RFI-BO-S-0830 00 KAIG3-RFI-BO-S-0830-00
KAIG3-RFI-BO-A-0212 01 KAIG3-RFI-BO-A-0212-01
KAIG3-RFI-BO-A-0219 00 KAIG3-RFI-BO-A-0219-00
KAIG3-RFI-BO-GE-0372 00 KAIG3-RFI-BO-GE-0372-00
KAIG3-RFI-BO-SU-0677 00 KAIG3-RFI-BO-SU-0677-00
KAIG3-RFI-BO-A-0218 00 KAIG3-RFI-BO-A-0218-00
KAIG3-RFI-PT-P-0027 00 KAIG3-RFI-PT-P-0027-00
KAIG3-RFI-PT-P-0026 00 KAIG3-RFI-PT-P-0026-00
KAIG3-RFI-CO-S-0826 00 KAIG3-RFI-CO-S-0826-00
KAIG3-RFI-CO-S-0825 00 KAIG3-RFI-CO-S-0825-00
KAIG3-RFI-CO-S-0824 00 KAIG3-RFI-CO-S-0824-00
KAIG3-RFI-BO-SU-0684 00 KAIG3-RFI-BO-SU-0684-00
KAIG3-RFI-CO-S-0823 00 KAIG3-RFI-CO-S-0823-00
KAIG3-RFI-BO-S-0822 00 KAIG3-RFI-BO-S-0822-00
KAIG3-RFI-CO-SU-0686 00 KAIG3-RFI-CO-SU-0686-00
KAIG3-RFI-BO-S-0821 00 KAIG3-RFI-BO-S-0821-00
KAIG3-RFI-CO-SU-0685 00 KAIG3-RFI-CO-SU-0685-00
KAIG3-RFI-TT-LC-0034 01 KAIG3-RFI-TT-LC-0034-01
KAIG3-RFI-WG-SU-0676 00 KAIG3-RFI-WG-SU-0676-00
KAIG3-RFI-BO-LC-0048 00 KAIG3-RFI-BO-LC-0048-00
KAIG3-RFI-BO-E-0051 00 KAIG3-RFI-BO-E-0051-00
KAIG3-RFI-TB-S-0820 00 KAIG3-RFI-TB-S-0820-00
KAIG3-RFI-WG-GE-0371 00 KAIG3-RFI-WG-GE-0371-00
KAIG3-RFI-GN-SU-0683 00 KAIG3-RFI-GN-SU-0683-00
KAIG3-RFI-GN-S-0819 00 KAIG3-RFI-GN-S-0819-00
KAIG3-RFI-BO-S-0818 00 KAIG3-RFI-BO-S-0818-00
KAIG3-RFI-MB-S-0817 00 KAIG3-RFI-MB-S-0817-00
KAIG3-RFI-MB-S-0815 00 KAIG3-RFI-MB-S-0815-00
KAIG3-RFI-MB-S-0816 00 KAIG3-RFI-MB-S-0816-00
KAIG3-RFI-TB-P-0025 00 KAIG3-RFI-TB-P-0025-00
KAIG3-RFI-CO-GE-0375 00 KAIG3-RFI-CO-GE-0375-00
KAIG3-RFI-CO-S-0814 00 KAIG3-RFI-CO-S-0814-00
KAIG3-RFI-CO-S-0813 00 KAIG3-RFI-CO-S-0813-00
KAIG3-RFI-CO-SU-0682 00 KAIG3-RFI-CO-SU-0682-00
KAIG3-RFI-CO-SU-0681 00 KAIG3-RFI-CO-SU-0681-00
KAIG3-RFI-BO-SU-0680 00 KAIG3-RFI-BO-SU-0680-00
KAIG3-RFI-BO-S-0812 00 KAIG3-RFI-BO-S-0812-00
KAIG3-RFI-BO-SU-0679 00 KAIG3-RFI-BO-SU-0679-00
KAIG3-RFI-GN-SU-0678 00 KAIG3-RFI-GN-SU-0678-00
KAIG3-RFI-BO-S-0811 00 KAIG3-RFI-BO-S-0811-00
KAIG3-RFI-BO-A-0216 00 KAIG3-RFI-BO-A-0216-00
KAIG3-RFI-TB-SU-0675 00 KAIG3-RFI-TB-SU-0675-00
KAIG3-RFI-TB-SU-0674 00 KAIG3-RFI-TB-SU-0674-00
KAIG3-RFI-TB-LC-0047 00 KAIG3-RFI-TB-LC-0047-00
KAIG3-RFI-TB-LC-0046 00 KAIG3-RFI-TB-LC-0046-00
KAIG3-RFI-TB-LC-0045 00 KAIG3-RFI-TB-LC-0045-00
KAIG3-RFI-TB-LC-0044 00 KAIG3-RFI-TB-LC-0044-00
KAIG3-RFI-TB-E-0050 00 KAIG3-RFI-TB-E-0050-00
KAIG3-RFI-PT-P-0024 00 KAIG3-RFI-PT-P-0024-00
KAIG3-RFI-BO-LC-0043 00 KAIG3-RFI-BO-LC-0043-00
KAIG3-RFI-BO-E-0049 00 KAIG3-RFI-BO-E-0049-00
KAIG3-RFI-BO-LC-0039 01 KAIG3-RFI-BO-LC-0039-01
KAIG3-RFI-BO-LC-0041 01 KAIG3-RFI-BO-LC-0041-01
KAIG3-RFI-CO-S-0810 00 KAIG3-RFI-CO-S-0810-00
KAIG3-RFI-CO-S-0809 00 KAIG3-RFI-CO-S-0809-00
KAIG3-RFI-CO-SU-0673 00 KAIG3-RFI-CO-SU-0673-00
KAIG3-RFI-BO-SU-0671 00 KAIG3-RFI-BO-SU-0671-00
KAIG3-RFI-BO-S-0808 00 KAIG3-RFI-BO-S-0808-00
KAIG3-RFI-BO-S-0807 00 KAIG3-RFI-BO-S-0807-00
KAIG3-RFI-BO-E-0043 01 KAIG3-RFI-BO-E-0043-01
KAIG3-RFI-MB-S-0806 00 KAIG3-RFI-MB-S-0806-00
KAIG3-RFI-MB-S-0805 00 KAIG3-RFI-MB-S-0805-00
KAIG3-RFI-PT-S-0804 00 KAIG3-RFI-PT-S-0804-00
KAIG3-RFI-BO-S-0800 00 KAIG3-RFI-BO-S-0800-00
KAIG3-RFI-MB-S-0801 00 KAIG3-RFI-MB-S-0801-00
KAIG3-RFI-BO-S-0799 00 KAIG3-RFI-BO-S-0799-00
KAIG3-RFI-BO-S-0803 00 KAIG3-RFI-BO-S-0803-00
KAIG3-RFI-BO-S-0802 00 KAIG3-RFI-BO-S-0802-00
KAIG3-RFI-WG-GE-0370 00 KAIG3-RFI-WG-GE-0370-00
KAIG3-RFI-WG-GE-0369 00 KAIG3-RFI-WG-GE-0369-00
KAIG3-RFI-PT-P-0023 00 KAIG3-RFI-PT-P-0023-00
KAIG3-RFI-WG-SU-0662 00 KAIG3-RFI-WG-SU-0662-00
KAIG3-RFI-WG-SU-0661 00 KAIG3-RFI-WG-SU-0661-00
KAIG3-RFI-PT-A-0190 03 KAIG3-RFI-PT-A-0190-03
KAIG3-RFI-TB-SU-0669 00 KAIG3-RFI-TB-SU-0669-00
KAIG3-RFI-PT-A-0215 00 KAIG3-RFI-PT-A-0215-00
KAIG3-RFI-PT-S-0789 00 KAIG3-RFI-PT-S-0789-00
KAIG3-RFI-BO-LC-0042 00 KAIG3-RFI-BO-LC-0042-00
KAIG3-RFI-BO-E-0048 00 KAIG3-RFI-BO-E-0048-00
KAIG3-RFI-TB-S-0795 00 KAIG3-RFI-TB-S-0795-00
KAIG3-RFI-BO-S-0797 00 KAIG3-RFI-BO-S-0797-00
KAIG3-RFI-BO-S-0796 00 KAIG3-RFI-BO-S-0796-00
KAIG3-RFI-BO-SU-0670 00 KAIG3-RFI-BO-SU-0670-00
KAIG3-RFI-CO-GE-0366 00 KAIG3-RFI-CO-GE-0366-00
KAIG3-RFI-CO-GE-0365 00 KAIG3-RFI-CO-GE-0365-00
KAIG3-RFI-CO-GE-0368 00 KAIG3-RFI-CO-GE-0368-00
KAIG3-RFI-CO-GE-0367 00 KAIG3-RFI-CO-GE-0367-00
KAIG3-RFI-CO-SU-0651 00 KAIG3-RFI-CO-SU-0651-00
KAIG3-RFI-CO-SU-0650 00 KAIG3-RFI-CO-SU-0650-00
KAIG3-RFI-BO-E-0046 00 KAIG3-RFI-BO-E-0046-00
KAIG3-RFI-TB-E-0047 00 KAIG3-RFI-TB-E-0047-00
KAIG3-RFI-FC-S-0786 00 KAIG3-RFI-FC-S-0786-00
KAIG3-RFI-BO-S-0794 00 KAIG3-RFI-BO-S-0794-00
KAIG3-RFI-MB-S-0793 00 KAIG3-RFI-MB-S-0793-00
KAIG3-RFI-MB-S-0792 00 KAIG3-RFI-MB-S-0792-00
KAIG3-RFI-GN-LS-0036 00 KAIG3-RFI-GN-LS-0036-00
KAIG3-RFI-GN-LS-0037 00 KAIG3-RFI-GN-LS-0037-00
KAIG3-RFI-GN-LS-0038 00 KAIG3-RFI-GN-LS-0038-00
KAIG3-RFI-BO-A-0209 01 KAIG3-RFI-BO-A-0209-01
KAIG3-RFI-TT-S-0654 01 KAIG3-RFI-TT-S-0654-01
KAIG3-RFI-TB-S-0790 00 KAIG3-RFI-TB-S-0790-00
KAIG3-RFI-TB-S-0789 00 KAIG3-RFI-TB-S-0789-00
KAIG3-RFI-TB-S-0791 00 KAIG3-RFI-TB-S-0791-00
KAIG3-RFI-TB-S-0787 00 KAIG3-RFI-TB-S-0787-00
KAIG3-RFI-TB-S-0788 00 KAIG3-RFI-TB-S-0788-00
KAIG3-RFI-MB-SU-0668 00 KAIG3-RFI-MB-SU-0668-00
KAIG3-RFI-TB-P-0022 00 KAIG3-RFI-TB-P-0022-00
KAIG3-RFI-MB-SU-0667 00 KAIG3-RFI-MB-SU-0667-00
KAIG3-RFI-CO-GE-0364 00 KAIG3-RFI-CO-GE-0364-00
KAIG3-RFI-CO-GE-0363 00 KAIG3-RFI-CO-GE-0363-00
KAIG3-RFI-CO-GE-0362 00 KAIG3-RFI-CO-GE-0362-00
KAIG3-RFI-CO-GE-0361 00 KAIG3-RFI-CO-GE-0361-00
KAIG3-RFI-CO-S-0783 00 KAIG3-RFI-CO-S-0783-00
KAIG3-RFI-CO-S-0774 00 KAIG3-RFI-CO-S-0774-00
KAIG3-RFI-CO-S-0773 00 KAIG3-RFI-CO-S-0773-00
KAIG3-RFI-CO-SU-0665 00 KAIG3-RFI-CO-SU-0665-00
KAIG3-RFI-CO-SU-0664 00 KAIG3-RFI-CO-SU-0664-00
KAIG3-RFI-CO-SU-0656 00 KAIG3-RFI-CO-SU-0656-00
KAIG3-RFI-BO-S-0784 00 KAIG3-RFI-BO-S-0784-00
KAIG3-RFI-BO-S-0785 00 KAIG3-RFI-BO-S-0785-00
KAIG3-RFI-BO-SU-0666 00 KAIG3-RFI-BO-SU-0666-00
KAIG3-RFI-PT-SU-0660 00 KAIG3-RFI-PT-SU-0660-00
KAIG3-RFI-BO-LC-0041 00 KAIG3-RFI-BO-LC-0041-00
KAIG3-RFI-TB-SU-0663 00 KAIG3-RFI-TB-SU-0663-00
KAIG3-RFI-BO-SU-0659 00 KAIG3-RFI-BO-SU-0659-00
KAIG3-RFI-BO-S-0782 00 KAIG3-RFI-BO-S-0782-00
KAIG3-RFI-BO-SU-0658 00 KAIG3-RFI-BO-SU-0658-00
KAIG3-RFI-BO-S-0781 00 KAIG3-RFI-BO-S-0781-00
KAIG3-RFI-BO-A-0214 00 KAIG3-RFI-BO-A-0214-00
KAIG3-RFI-BO-SU-0657 00 KAIG3-RFI-BO-SU-0657-00
KAIG3-RFI-TB-S-0779 00 KAIG3-RFI-TB-S-0779-00
KAIG3-RFI-TB-S-0780 00 KAIG3-RFI-TB-S-0780-00
KAIG3-RFI-TB-E-0045 00 KAIG3-RFI-TB-E-0045-00
KAIG3-RFI-BO-S-0778 00 KAIG3-RFI-BO-S-0778-00
KAIG3-RFI-PT-S-0777 00 KAIG3-RFI-PT-S-0777-00
KAIG3-RFI-BO-A-0213 00 KAIG3-RFI-BO-A-0213-00
KAIG3-RFI-BO-S-0775 00 KAIG3-RFI-BO-S-0775-00
KAIG3-RFI-BO-S-0776 00 KAIG3-RFI-BO-S-0776-00
KAIG3-RFI-GN-SU-0655 00 KAIG3-RFI-GN-SU-0655-00
KAIG3-RFI-GN-LS-0035 00 KAIG3-RFI-GN-LS-0035-00
KAIG3-RFI-BO-S-0772 00 KAIG3-RFI-BO-S-0772-00
KAIG3-RFI-CO-GE-0360 00 KAIG3-RFI-CO-GE-0360-00
KAIG3-RFI-CO-GE-0359 00 KAIG3-RFI-CO-GE-0359-00
KAIG3-RFI-TB-E-0044 00 KAIG3-RFI-TB-E-0044-00
KAIG3-RFI-TB-LC-0040 00 KAIG3-RFI-TB-LC-0040-00
KAIG3-RFI-CO-S-0771 00 KAIG3-RFI-CO-S-0771-00
KAIG3-RFI-CO-SU-0654 00 KAIG3-RFI-CO-SU-0654-00
KAIG3-RFI-CO-S-0770 00 KAIG3-RFI-CO-S-0770-00
KAIG3-RFI-CO-S-0769 00 KAIG3-RFI-CO-S-0769-00
KAIG3-RFI-CO-S-0768 00 KAIG3-RFI-CO-S-0768-00
KAIG3-RFI-CO-SU-0653 00 KAIG3-RFI-CO-SU-0653-00
KAIG3-RFI-CO-SU-0652 00 KAIG3-RFI-CO-SU-0652-00
KAIG3-RFI-CO-GE-0358 00 KAIG3-RFI-CO-GE-0358-00
KAIG3-RFI-CO-GE-0357 00 KAIG3-RFI-CO-GE-0357-00
KAIG3-RFI-CO-GE-0356 00 KAIG3-RFI-CO-GE-0356-00
KAIG3-RFI-CO-GE-0355 00 KAIG3-RFI-CO-GE-0355-00
KAIG3-RFI-GN-LS-0034 00 KAIG3-RFI-GN-LS-0034-00
KAIG3-RFI-GN-LS-0033 00 KAIG3-RFI-GN-LS-0033-00
KAIG3-RFI-TB-SU-0648 00 KAIG3-RFI-TB-SU-0648-00
KAIG3-RFI-TB-S-0767 00 KAIG3-RFI-TB-S-0767-00
KAIG3-RFI-GN-SU-0649 00 KAIG3-RFI-GN-SU-0649-00
KAIG3-RFI-BO-LC-0039 00 KAIG3-RFI-BO-LC-0039-00
KAIG3-RFI-PT-SU-0621 01 KAIG3-RFI-PT-SU-0621-01
KAIG3-RFI-BO-E-0043 00 KAIG3-RFI-BO-E-0043-00
KAIG3-RFI-CO-SU-0647 00 KAIG3-RFI-CO-SU-0647-00
KAIG3-RFI-CO-SU-0646 00 KAIG3-RFI-CO-SU-0646-00
KAIG3-RFI-CO-SU-0645 00 KAIG3-RFI-CO-SU-0645-00
KAIG3-RFI-CO-SU-0644 00 KAIG3-RFI-CO-SU-0644-00
KAIG3-RFI-BO-A-0210 01 KAIG3-RFI-BO-A-0210-01
KAIG3-RFI-PT-SU-0603 01 KAIG3-RFI-PT-SU-0603-01
KAIG3-RFI-PT-S-0766 00 KAIG3-RFI-PT-S-0766-00
KAIG3-RFI-TB-SU-0643 00 KAIG3-RFI-TB-SU-0643-00
KAIG3-RFI-PT-S-0765 00 KAIG3-RFI-PT-S-0765-00
KAIG3-RFI-GN-SU-0642 00 KAIG3-RFI-GN-SU-0642-00
KAIG3-RFI-CO-GE-0352 00 KAIG3-RFI-CO-GE-0352-00
KAIG3-RFI-CO-GE-0351 00 KAIG3-RFI-CO-GE-0351-00
KAIG3-RFI-CO-GE-0350 00 KAIG3-RFI-CO-GE-0350-00
KAIG3-RFI-CO-GE-0349 00 KAIG3-RFI-CO-GE-0349-00
KAIG3-RFI-CO-GE-0348 00 KAIG3-RFI-CO-GE-0348-00
KAIG3-RFI-CO-GE-0347 00 KAIG3-RFI-CO-GE-0347-00
KAIG3-RFI-CO-GE-0346 00 KAIG3-RFI-CO-GE-0346-00
KAIG3-RFI-CO-GE-0345 00 KAIG3-RFI-CO-GE-0345-00
KAIG3-RFI-MB-S-0764 00 KAIG3-RFI-MB-S-0764-00
KAIG3-RFI-MB-S-0761 00 KAIG3-RFI-MB-S-0761-00
KAIG3-RFI-MB-S-0763 00 KAIG3-RFI-MB-S-0763-00
KAIG3-RFI-BO-SU-0641 00 KAIG3-RFI-BO-SU-0641-00
KAIG3-RFI-BO-S-0762 00 KAIG3-RFI-BO-S-0762-00
KAIG3-RFI-BO-A-0212 00 KAIG3-RFI-BO-A-0212-00
KAIG3-RFI-BO-A-0211 00 KAIG3-RFI-BO-A-0211-00
KAIG3-RFI-TB-P-0020 00 KAIG3-RFI-TB-P-0020-00
KAIG3-RFI-TB-LC-0038 00 KAIG3-RFI-TB-LC-0038-00
KAIG3-RFI-TB-LC-0037 00 KAIG3-RFI-TB-LC-0037-00
KAIG3-RFI-TB-LC-0036 00 KAIG3-RFI-TB-LC-0036-00
KAIG3-RFI-TB-LC-0035 00 KAIG3-RFI-TB-LC-0035-00
KAIG3-RFI-TB-E-0042 00 KAIG3-RFI-TB-E-0042-00
KAIG3-RFI-CO-SU-0638 00 KAIG3-RFI-CO-SU-0638-00
KAIG3-RFI-CO-SU-0637 00 KAIG3-RFI-CO-SU-0637-00
KAIG3-RFI-CO-GE-0344 00 KAIG3-RFI-CO-GE-0344-00
KAIG3-RFI-CO-SU-0636 00 KAIG3-RFI-CO-SU-0636-00
KAIG3-RFI-CO-SU-0632 00 KAIG3-RFI-CO-SU-0632-00
KAIG3-RFI-CO-SU-0631 00 KAIG3-RFI-CO-SU-0631-00
KAIG3-RFI-CO-SU-0627 00 KAIG3-RFI-CO-SU-0627-00
KAIG3-RFI-BO-S-0759 00 KAIG3-RFI-BO-S-0759-00
KAIG3-RFI-GN-SU-0634 00 KAIG3-RFI-GN-SU-0634-00
KAIG3-RFI-BO-SU-0635 00 KAIG3-RFI-BO-SU-0635-00
KAIG3-RFI-PT-S-0760 00 KAIG3-RFI-PT-S-0760-00
KAIG3-RFI-GN-SU-0622 00 KAIG3-RFI-GN-SU-0622-00
KAIG3-RFI-BO-S-0741 00 KAIG3-RFI-BO-S-0741-00
KAIG3-RFI-BO-A-0210 00 KAIG3-RFI-BO-A-0210-00
KAIG3-RFI-BO-A-0209 00 KAIG3-RFI-BO-A-0209-00
KAIG3-RFI-CO-S-0758 00 KAIG3-RFI-CO-S-0758-00
KAIG3-RFI-CO-SU-0633 00 KAIG3-RFI-CO-SU-0633-00
KAIG3-RFI-TB-SU-0629 00 KAIG3-RFI-TB-SU-0629-00
KAIG3-RFI-TB-SU-0630 00 KAIG3-RFI-TB-SU-0630-00
KAIG3-RFI-MB-S-0755 00 KAIG3-RFI-MB-S-0755-00
KAIG3-RFI-CO-GE-0342 00 KAIG3-RFI-CO-GE-0342-00
KAIG3-RFI-MB-S-0756 00 KAIG3-RFI-MB-S-0756-00
KAIG3-RFI-MB-S-0757 00 KAIG3-RFI-MB-S-0757-00
KAIG3-RFI-MB-SU-0628 00 KAIG3-RFI-MB-SU-0628-00
KAIG3-RFI-CO-GE-0341 00 KAIG3-RFI-CO-GE-0341-00
KAIG3-RFI-CO-GE-0340 00 KAIG3-RFI-CO-GE-0340-00
KAIG3-RFI-CO-GE-0339 00 KAIG3-RFI-CO-GE-0339-00
KAIG3-RFI-TB-SU-0583 01 KAIG3-RFI-TB-SU-0583-01
KAIG3-RFI-BO-S-0473 01 KAIG3-RFI-BO-S-0473-01
KAIG3-RFI-BO-S-0754 00 KAIG3-RFI-BO-S-0754-00
KAIG3-RFI-BO-S-0751 00 KAIG3-RFI-BO-S-0751-00
KAIG3-RFI-PT-S-0750 00 KAIG3-RFI-PT-S-0750-00
KAIG3-RFI-TB-S-0752 00 KAIG3-RFI-TB-S-0752-00
KAIG3-RFI-CO-S-0753 00 KAIG3-RFI-CO-S-0753-00
KAIG3-RFI-CO-GE-0334 00 KAIG3-RFI-CO-GE-0334-00
KAIG3-RFI-CO-GE-0333 00 KAIG3-RFI-CO-GE-0333-00
KAIG3-RFI-CO-GE-0332 00 KAIG3-RFI-CO-GE-0332-00
KAIG3-RFI-CO-GE-0331 00 KAIG3-RFI-CO-GE-0331-00
KAIG3-RFI-CO-SU-0626 00 KAIG3-RFI-CO-SU-0626-00
KAIG3-RFI-CO-SU-0625 00 KAIG3-RFI-CO-SU-0625-00
KAIG3-RFI-CO-SU-0620 00 KAIG3-RFI-CO-SU-0620-00
KAIG3-RFI-PT-A-0190 02 KAIG3-RFI-PT-A-0190-02
KAIG3-RFI-GN-SU-0624 00 KAIG3-RFI-GN-SU-0624-00
KAIG3-RFI-BO-S-0747 00 KAIG3-RFI-BO-S-0747-00
KAIG3-RFI-MB-SU-0625 00 KAIG3-RFI-MB-SU-0625-00
KAIG3-RFI-MB-S-0748 00 KAIG3-RFI-MB-S-0748-00
KAIG3-RFI-CO-S-0749 00 KAIG3-RFI-CO-S-0749-00
KAIG3-RFI-CO-S-0746 00 KAIG3-RFI-CO-S-0746-00
KAIG3-RFI-CO-SU-0623 00 KAIG3-RFI-CO-SU-0623-00
KAIG3-RFI-TB-S-0743 00 KAIG3-RFI-TB-S-0743-00
KAIG3-RFI-TB-S-0742 00 KAIG3-RFI-TB-S-0742-00
KAIG3-RFI-PT-SU-0603 00 KAIG3-RFI-PT-SU-0603-00
KAIG3-RFI-CO-SU-0619 00 KAIG3-RFI-CO-SU-0619-00
KAIG3-RFI-PT-S-0744 00 KAIG3-RFI-PT-S-0744-00
KAIG3-RFI-MB-S-0745 00 KAIG3-RFI-MB-S-0745-00
KAIG3-RFI-CO-GE-0338 00 KAIG3-RFI-CO-GE-0338-00
KAIG3-RFI-CO-GE-0337 00 KAIG3-RFI-CO-GE-0337-00
KAIG3-RFI-CO-GE-0336 00 KAIG3-RFI-CO-GE-0336-00
KAIG3-RFI-CO-GE-0335 00 KAIG3-RFI-CO-GE-0335-00
KAIG3-RFI-CO-GE-0330 00 KAIG3-RFI-CO-GE-0330-00
KAIG3-RFI-CO-GE-0329 00 KAIG3-RFI-CO-GE-0329-00
KAIG3-RFI-BO-SU-0574 00 KAIG3-RFI-BO-SU-0574-00
KAIG3-RFI-PT-SU-0621 00 KAIG3-RFI-PT-SU-0621-00
KAIG3-RFI-BO-S-0740 00 KAIG3-RFI-BO-S-0740-00
KAIG3-RFI-BO-GE-0320 00 KAIG3-RFI-BO-GE-0320-00
KAIG3-RFI-BO-S-0696 00 KAIG3-RFI-BO-S-0696-00
KAIG3-RFI-CO-GE-0324 00 KAIG3-RFI-CO-GE-0324-00
KAIG3-RFI-CO-GE-0323 00 KAIG3-RFI-CO-GE-0323-00
KAIG3-RFI-CO-GE-0322 00 KAIG3-RFI-CO-GE-0322-00
KAIG3-RFI-CO-GE-0321 00 KAIG3-RFI-CO-GE-0321-00
KAIG3-RFI-CO-GE-0328 00 KAIG3-RFI-CO-GE-0328-00
KAIG3-RFI-CO-GE-0327 00 KAIG3-RFI-CO-GE-0327-00
KAIG3-RFI-TB-GE-0319 00 KAIG3-RFI-TB-GE-0319-00
KAIG3-RFI-TB-SU-0616 00 KAIG3-RFI-TB-SU-0616-00
KAIG3-RFI-CO-GE-0326 00 KAIG3-RFI-CO-GE-0326-00
KAIG3-RFI-CO-GE-0325 00 KAIG3-RFI-CO-GE-0325-00
KAIG3-RFI-TB-SU-0583 00 KAIG3-RFI-TB-SU-0583-00
KAIG3-RFI-BO-S-0739 00 KAIG3-RFI-BO-S-0739-00
KAIG3-RFI-GN-SU-0618 00 KAIG3-RFI-GN-SU-0618-00
KAIG3-RFI-TT-A-0202 01 KAIG3-RFI-TT-A-0202-01
KAIG3-RFI-CO-S-0738 00 KAIG3-RFI-CO-S-0738-00
KAIG3-RFI-CO-S-0737 00 KAIG3-RFI-CO-S-0737-00
KAIG3-RFI-CO-SU-0617 00 KAIG3-RFI-CO-SU-0617-00
KAIG3-RFI-GN-SU-0612 00 KAIG3-RFI-GN-SU-0612-00
KAIG3-RFI-PT-A-0208 00 KAIG3-RFI-PT-A-0208-00
KAIG3-RFI-CO-SU-0613 00 KAIG3-RFI-CO-SU-0613-00
KAIG3-RFI-TT-SU-0615 00 KAIG3-RFI-TT-SU-0615-00
KAIG3-RFI-CO-SU-0614 00 KAIG3-RFI-CO-SU-0614-00
KAIG3-RFI-TB-S-0734 00 KAIG3-RFI-TB-S-0734-00
KAIG3-RFI-CO-GE-0318 00 KAIG3-RFI-CO-GE-0318-00
KAIG3-RFI-CO-GE-0317 00 KAIG3-RFI-CO-GE-0317-00
KAIG3-RFI-CO-GE-0316 00 KAIG3-RFI-CO-GE-0316-00
KAIG3-RFI-TB-SU-0611 00 KAIG3-RFI-TB-SU-0611-00
KAIG3-RFI-CO-GE-0315 00 KAIG3-RFI-CO-GE-0315-00
KAIG3-RFI-TT-S-0735 00 KAIG3-RFI-TT-S-0735-00
KAIG3-RFI-TT-S-0736 00 KAIG3-RFI-TT-S-0736-00
KAIG3-RFI-CO-SU-0610 00 KAIG3-RFI-CO-SU-0610-00
KAIG3-RFI-TB-S-0733 00 KAIG3-RFI-TB-S-0733-00
KAIG3-RFI-CO-SU-0606 00 KAIG3-RFI-CO-SU-0606-00
KAIG3-RFI-TT-LC-0034 00 KAIG3-RFI-TT-LC-0034-00
KAIG3-RFI-BO-A-0170 01 KAIG3-RFI-BO-A-0170-01
KAIG3-RFI-BO-A-0206 00 KAIG3-RFI-BO-A-0206-00
KAIG3-RFI-MB-S-0732 00 KAIG3-RFI-MB-S-0732-00
KAIG3-RFI-GN-S-0706 01 KAIG3-RFI-GN-S-0706-01
KAIG3-RFI-TB-S-0730 00 KAIG3-RFI-TB-S-0730-00
KAIG3-RFI-BO-S-0731 00 KAIG3-RFI-BO-S-0731-00
KAIG3-RFI-TB-E-0041 00 KAIG3-RFI-TB-E-0041-00
KAIG3-RFI-CO-S-0729 00 KAIG3-RFI-CO-S-0729-00
KAIG3-RFI-CO-S-0728 00 KAIG3-RFI-CO-S-0728-00
KAIG3-RFI-CO-S-0727 00 KAIG3-RFI-CO-S-0727-00
KAIG3-RFI-CO-S-0726 00 KAIG3-RFI-CO-S-0726-00
KAIG3-RFI-CO-SU-0609 00 KAIG3-RFI-CO-SU-0609-00
KAIG3-RFI-CO-SU-0608 00 KAIG3-RFI-CO-SU-0608-00
KAIG3-RFI-CO-SU-0607 00 KAIG3-RFI-CO-SU-0607-00
KAIG3-RFI-BO-A-0205 00 KAIG3-RFI-BO-A-0205-00
KAIG3-RFI-BO-S-0725 00 KAIG3-RFI-BO-S-0725-00
KAIG3-RFI-BO-S-0724 00 KAIG3-RFI-BO-S-0724-00
KAIG3-RFI-GN-SU-0605 00 KAIG3-RFI-GN-SU-0605-00
KAIG3-RFI-GN-GE-0314 00 KAIG3-RFI-GN-GE-0314-00
KAIG3-RFI-CO-SU-0604 00 KAIG3-RFI-CO-SU-0604-00
KAIG3-RFI-CO-GE-0217 01 KAIG3-RFI-CO-GE-0217-01
KAIG3-RFI-CO-GE-0216 01 KAIG3-RFI-CO-GE-0216-01
KAIG3-RFI-CO-SU-0601 00 KAIG3-RFI-CO-SU-0601-00
KAIG3-RFI-PT-S-0718 00 KAIG3-RFI-PT-S-0718-00
KAIG3-RFI-PT-S-0717 00 KAIG3-RFI-PT-S-0717-00
KAIG3-RFI-GN-S-0715 00 KAIG3-RFI-GN-S-0715-00
KAIG3-RFI-PT-S-0721 00 KAIG3-RFI-PT-S-0721-00
KAIG3-RFI-BO-S-0723 00 KAIG3-RFI-BO-S-0723-00
KAIG3-RFI-GN-SU-0602 00 KAIG3-RFI-GN-SU-0602-00
KAIG3-RFI-CO-GE-0312 00 KAIG3-RFI-CO-GE-0312-00
KAIG3-RFI-CO-GE-0313 00 KAIG3-RFI-CO-GE-0313-00
KAIG3-RFI-CO-GE-0311 00 KAIG3-RFI-CO-GE-0311-00
KAIG3-RFI-CO-GE-0310 00 KAIG3-RFI-CO-GE-0310-00
KAIG3-RFI-CO-SU-0600 00 KAIG3-RFI-CO-SU-0600-00
KAIG3-RFI-CO-SU-0597 00 KAIG3-RFI-CO-SU-0597-00
KAIG3-RFI-CO-SU-0596 00 KAIG3-RFI-CO-SU-0596-00
KAIG3-RFI-CO-S-0720 00 KAIG3-RFI-CO-S-0720-00
KAIG3-RFI-TT-SU-0598 00 KAIG3-RFI-TT-SU-0598-00
KAIG3-RFI-BO-S-0722 00 KAIG3-RFI-BO-S-0722-00
KAIG3-RFI-CO-SU-0599 00 KAIG3-RFI-CO-SU-0599-00
KAIG3-RFI-TB-SU-0582 00 KAIG3-RFI-TB-SU-0582-00
KAIG3-RFI-TB-SU-0580 01 KAIG3-RFI-TB-SU-0580-01
KAIG3-RFI-CO-GE-0309 00 KAIG3-RFI-CO-GE-0309-00
KAIG3-RFI-CO-GE-0308 00 KAIG3-RFI-CO-GE-0308-00
KAIG3-RFI-TB-S-0716 00 KAIG3-RFI-TB-S-0716-00
KAIG3-RFI-GN-GE-0307 00 KAIG3-RFI-GN-GE-0307-00
KAIG3-RFI-GN-SU-0595 00 KAIG3-RFI-GN-SU-0595-00
KAIG3-RFI-GN-GE-0306 00 KAIG3-RFI-GN-GE-0306-00
KAIG3-RFI-GN-SU-0594 00 KAIG3-RFI-GN-SU-0594-00
KAIG3-RFI-CO-SU-0589 00 KAIG3-RFI-CO-SU-0589-00
KAIG3-RFI-BO-A-0204 00 KAIG3-RFI-BO-A-0204-00
KAIG3-RFI-TB-S-0714 00 KAIG3-RFI-TB-S-0714-00
KAIG3-RFI-TT-S-0713 00 KAIG3-RFI-TT-S-0713-00
KAIG3-RFI-TT-S-0712 00 KAIG3-RFI-TT-S-0712-00
KAIG3-RFI-CO-SU-0588 00 KAIG3-RFI-CO-SU-0588-00
KAIG3-RFI-CO-GE-0305 00 KAIG3-RFI-CO-GE-0305-00
KAIG3-RFI-CO-GE-0304 00 KAIG3-RFI-CO-GE-0304-00
KAIG3-RFI-CO-GE-0303 00 KAIG3-RFI-CO-GE-0303-00
KAIG3-RFI-CO-GE-0302 00 KAIG3-RFI-CO-GE-0302-00
KAIG3-RFI-CO-SU-0587 00 KAIG3-RFI-CO-SU-0587-00
KAIG3-RFI-TB-SU-0593 00 KAIG3-RFI-TB-SU-0593-00
KAIG3-RFI-TB-S-0710 00 KAIG3-RFI-TB-S-0710-00
KAIG3-RFI-BO-S-0711 00 KAIG3-RFI-BO-S-0711-00
KAIG3-RFI-TB-E-0040 00 KAIG3-RFI-TB-E-0040-00
KAIG3-RFI-CO-S-0709 00 KAIG3-RFI-CO-S-0709-00
KAIG3-RFI-CO-SU-0592 00 KAIG3-RFI-CO-SU-0592-00
KAIG3-RFI-CO-SU-0591 00 KAIG3-RFI-CO-SU-0591-00
KAIG3-RFI-CO-S-0708 00 KAIG3-RFI-CO-S-0708-00
KAIG3-RFI-CO-S-0707 00 KAIG3-RFI-CO-S-0707-00
KAIG3-RFI-CO-SU-0590 00 KAIG3-RFI-CO-SU-0590-00
KAIG3-RFI-CO-SU-0579 00 KAIG3-RFI-CO-SU-0579-00
KAIG3-RFI-CO-SU-0578 00 KAIG3-RFI-CO-SU-0578-00
KAIG3-RFI-CO-SU-0586 00 KAIG3-RFI-CO-SU-0586-00
KAIG3-RFI-CO-GE-0298 00 KAIG3-RFI-CO-GE-0298-00
KAIG3-RFI-CO-GE-0301 00 KAIG3-RFI-CO-GE-0301-00
KAIG3-RFI-CO-GE-0300 00 KAIG3-RFI-CO-GE-0300-00
KAIG3-RFI-CO-GE-0299 00 KAIG3-RFI-CO-GE-0299-00
KAIG3-RFI-TB-E-0039 00 KAIG3-RFI-TB-E-0039-00
KAIG3-RFI-TB-LC-0033 00 KAIG3-RFI-TB-LC-0033-00
KAIG3-RFI-TB-LC-0032 00 KAIG3-RFI-TB-LC-0032-00
KAIG3-RFI-TB-LC-0031 00 KAIG3-RFI-TB-LC-0031-00
KAIG3-RFI-TB-LC-0030 00 KAIG3-RFI-TB-LC-0030-00
KAIG3-RFI-TT-SU-0585 00 KAIG3-RFI-TT-SU-0585-00
KAIG3-RFI-BO-A-0203 00 KAIG3-RFI-BO-A-0203-00
KAIG3-RFI-GN-S-0706 00 KAIG3-RFI-GN-S-0706-00
KAIG3-RFI-BO-S-0705 00 KAIG3-RFI-BO-S-0705-00
KAIG3-RFI-CO-S-0701 00 KAIG3-RFI-CO-S-0701-00
KAIG3-RFI-TT-A-0201 00 KAIG3-RFI-TT-A-0201-00
KAIG3-RFI-TB-P-0019 00 KAIG3-RFI-TB-P-0019-00
KAIG3-RFI-TB-P-0018 00 KAIG3-RFI-TB-P-0018-00
KAIG3-RFI-TT-A-0202 00 KAIG3-RFI-TT-A-0202-00
KAIG3-RFI-TB-S-0704 00 KAIG3-RFI-TB-S-0704-00
KAIG3-RFI-TB-S-0703 00 KAIG3-RFI-TB-S-0703-00
KAIG3-RFI-TB-S-0702 00 KAIG3-RFI-TB-S-0702-00
KAIG3-RFI-TB-S-0700 00 KAIG3-RFI-TB-S-0700-00
KAIG3-RFI-CO-SU-0584 00 KAIG3-RFI-CO-SU-0584-00
KAIG3-RFI-BO-A-0200 00 KAIG3-RFI-BO-A-0200-00
KAIG3-RFI-TB-LC-0029 00 KAIG3-RFI-TB-LC-0029-00
KAIG3-RFI-TB-E-0038 00 KAIG3-RFI-TB-E-0038-00
KAIG3-RFI-TB-SU-0581 00 KAIG3-RFI-TB-SU-0581-00
KAIG3-RFI-TB-SU-0580 00 KAIG3-RFI-TB-SU-0580-00
KAIG3-RFI-TG-GE-0252 00 KAIG3-RFI-TG-GE-0252-00
KAIG3-RFI-TG-GE-0251 00 KAIG3-RFI-TG-GE-0251-00
KAIG3-RFI-TT-S-0699 00 KAIG3-RFI-TT-S-0699-00
KAIG3-RFI-TT-S-0692 00 KAIG3-RFI-TT-S-0692-00
KAIG3-RFI-TT-S-0693 00 KAIG3-RFI-TT-S-0693-00
KAIG3-RFI-TT-S-0694 00 KAIG3-RFI-TT-S-0694-00
KAIG3-RFI-CO-SU-0577 00 KAIG3-RFI-CO-SU-0577-00
KAIG3-RFI-CO-SU-0575 00 KAIG3-RFI-CO-SU-0575-00
KAIG3-RFI-CO-GE-0297 00 KAIG3-RFI-CO-GE-0297-00
KAIG3-RFI-CO-GE-0296 00 KAIG3-RFI-CO-GE-0296-00
KAIG3-RFI-DG-GE-0295 00 KAIG3-RFI-DG-GE-0295-00
KAIG3-RFI-CO-S-0691 00 KAIG3-RFI-CO-S-0691-00
KAIG3-RFI-CO-S-0690 00 KAIG3-RFI-CO-S-0690-00
KAIG3-RFI-CO-SU-0576 00 KAIG3-RFI-CO-SU-0576-00
KAIG3-RFI-CO-GE-0294 00 KAIG3-RFI-CO-GE-0294-00
KAIG3-RFI-CO-GE-0293 00 KAIG3-RFI-CO-GE-0293-00
KAIG3-RFI-DG-SU-0569 00 KAIG3-RFI-DG-SU-0569-00
KAIG3-RFI-TT-S-0689 00 KAIG3-RFI-TT-S-0689-00
KAIG3-RFI-MB-S-0688 00 KAIG3-RFI-MB-S-0688-00
KAIG3-RFI-CO-GE-0292 00 KAIG3-RFI-CO-GE-0292-00
KAIG3-RFI-CO-GE-0291 00 KAIG3-RFI-CO-GE-0291-00
KAIG3-RFI-CO-GE-0290 00 KAIG3-RFI-CO-GE-0290-00
KAIG3-RFI-CO-GE-0289 00 KAIG3-RFI-CO-GE-0289-00
KAIG3-RFI-CO-SU-0568 00 KAIG3-RFI-CO-SU-0568-00
KAIG3-RFI-CO-S-0687 00 KAIG3-RFI-CO-S-0687-00
KAIG3-RFI-CO-S-0686 00 KAIG3-RFI-CO-S-0686-00
KAIG3-RFI-FC-E-0037 00 KAIG3-RFI-FC-E-0037-00
KAIG3-RFI-BO-S-0684 00 KAIG3-RFI-BO-S-0684-00
KAIG3-RFI-BO-S-0685 00 KAIG3-RFI-BO-S-0685-00
KAIG3-RFI-BO-S-0683 00 KAIG3-RFI-BO-S-0683-00
KAIG3-RFI-GN-S-0682 00 KAIG3-RFI-GN-S-0682-00
KAIG3-RFI-MB-S-0681 00 KAIG3-RFI-MB-S-0681-00
KAIG3-RFI-GN-SU-0573 00 KAIG3-RFI-GN-SU-0573-00
KAIG3-RFI-CO-S-0680 00 KAIG3-RFI-CO-S-0680-00
KAIG3-RFI-CO-SU-0572 00 KAIG3-RFI-CO-SU-0572-00
KAIG3-RFI-MB-S-0676 00 KAIG3-RFI-MB-S-0676-00
KAIG3-RFI-MB-S-0678 00 KAIG3-RFI-MB-S-0678-00
KAIG3-RFI-CO-S-0677 00 KAIG3-RFI-CO-S-0677-00
KAIG3-RFI-CO-SU-0571 00 KAIG3-RFI-CO-SU-0571-00
KAIG3-RFI-PT-S-0675 00 KAIG3-RFI-PT-S-0675-00
KAIG3-RFI-PT-A-0190 01 KAIG3-RFI-PT-A-0190-01
KAIG3-RFI-PT-A-0199 00 KAIG3-RFI-PT-A-0199-00
KAIG3-RFI-PT-S-0673 00 KAIG3-RFI-PT-S-0673-00
KAIG3-RFI-PT-SU-0570 00 KAIG3-RFI-PT-SU-0570-00
KAIG3-RFI-PT-S-0674 00 KAIG3-RFI-PT-S-0674-00
KAIG3-RFI-PT-A-0183 01 KAIG3-RFI-PT-A-0183-01
KAIG3-RFI-CO-SU-0567 00 KAIG3-RFI-CO-SU-0567-00
KAIG3-RFI-CO-SU-0566 00 KAIG3-RFI-CO-SU-0566-00
KAIG3-RFI-CO-SU-0565 00 KAIG3-RFI-CO-SU-0565-00
KAIG3-RFI-CO-SU-0564 00 KAIG3-RFI-CO-SU-0564-00
KAIG3-RFI-CO-GE-0286 00 KAIG3-RFI-CO-GE-0286-00
KAIG3-RFI-CO-GE-0285 00 KAIG3-RFI-CO-GE-0285-00
KAIG3-RFI-CO-GE-0284 00 KAIG3-RFI-CO-GE-0284-00
KAIG3-RFI-CO-GE-0283 00 KAIG3-RFI-CO-GE-0283-00
KAIG3-RFI-BO-A-0198 00 KAIG3-RFI-BO-A-0198-00
KAIG3-RFI-PT-S-0553 02 KAIG3-RFI-PT-S-0553-02
KAIG3-RFI-PT-S-0554 02 KAIG3-RFI-PT-S-0554-02
KAIG3-RFI-CO-S-0672 00 KAIG3-RFI-CO-S-0672-00
KAIG3-RFI-CO-S-0671 00 KAIG3-RFI-CO-S-0671-00
KAIG3-RFI-CO-S-0670 00 KAIG3-RFI-CO-S-0670-00
KAIG3-RFI-CO-S-0669 00 KAIG3-RFI-CO-S-0669-00
KAIG3-RFI-CO-SU-0563 00 KAIG3-RFI-CO-SU-0563-00
KAIG3-RFI-CO-SU-0562 00 KAIG3-RFI-CO-SU-0562-00
KAIG3-RFI-CO-SU-0561 00 KAIG3-RFI-CO-SU-0561-00
KAIG3-RFI-TT-SU-0560 00 KAIG3-RFI-TT-SU-0560-00
KAIG3-RFI-TT-A-0193 01 KAIG3-RFI-TT-A-0193-01
KAIG3-RFI-SG-GE-0282 00 KAIG3-RFI-SG-GE-0282-00
KAIG3-RFI-SG-GE-0281 00 KAIG3-RFI-SG-GE-0281-00
KAIG3-RFI-SG-GE-0280 00 KAIG3-RFI-SG-GE-0280-00
KAIG3-RFI-TT-S-0668 00 KAIG3-RFI-TT-S-0668-00
KAIG3-RFI-TT-S-0667 00 KAIG3-RFI-TT-S-0667-00
KAIG3-RFI-TT-S-0665 00 KAIG3-RFI-TT-S-0665-00
KAIG3-RFI-TT-A-0196 00 KAIG3-RFI-TT-A-0196-00
KAIG3-RFI-TT-S-0666 00 KAIG3-RFI-TT-S-0666-00
KAIG3-RFI-PT-A-0197 00 KAIG3-RFI-PT-A-0197-00
KAIG3-RFI-CO-S-0664 00 KAIG3-RFI-CO-S-0664-00
KAIG3-RFI-CO-S-0663 00 KAIG3-RFI-CO-S-0663-00
KAIG3-RFI-CO-SU-0559 00 KAIG3-RFI-CO-SU-0559-00
KAIG3-RFI-CO-SU-0557 00 KAIG3-RFI-CO-SU-0557-00
KAIG3-RFI-GN-S-0662 00 KAIG3-RFI-GN-S-0662-00
KAIG3-RFI-GN-SU-0558 00 KAIG3-RFI-GN-SU-0558-00
KAIG3-RFI-CO-SU-0556 00 KAIG3-RFI-CO-SU-0556-00
KAIG3-RFI-SG-SU-0555 00 KAIG3-RFI-SG-SU-0555-00
KAIG3-RFI-SG-SU-0554 00 KAIG3-RFI-SG-SU-0554-00
KAIG3-RFI-PT-S-0660 00 KAIG3-RFI-PT-S-0660-00
KAIG3-RFI-SG-SU-0553 00 KAIG3-RFI-SG-SU-0553-00
KAIG3-RFI-EC-SU-0552 00 KAIG3-RFI-EC-SU-0552-00
KAIG3-RFI-TT-S-0654 00 KAIG3-RFI-TT-S-0654-00
KAIG3-RFI-TB-S-0659 00 KAIG3-RFI-TB-S-0659-00
KAIG3-RFI-TT-SU-0551 00 KAIG3-RFI-TT-SU-0551-00
KAIG3-RFI-EC-GE-0277 00 KAIG3-RFI-EC-GE-0277-00
KAIG3-RFI-EC-GE-0271 00 KAIG3-RFI-EC-GE-0271-00
KAIG3-RFI-EC-GE-0270 00 KAIG3-RFI-EC-GE-0270-00
KAIG3-RFI-CO-S-0658 00 KAIG3-RFI-CO-S-0658-00
KAIG3-RFI-CO-S-0657 00 KAIG3-RFI-CO-S-0657-00
KAIG3-RFI-CO-SU-0550 00 KAIG3-RFI-CO-SU-0550-00
KAIG3-RFI-CO-SU-0549 00 KAIG3-RFI-CO-SU-0549-00
KAIG3-RFI-EC-SU-0546 00 KAIG3-RFI-EC-SU-0546-00
KAIG3-RFI-EC-SU-0540 00 KAIG3-RFI-EC-SU-0540-00
KAIG3-RFI-TT-SU-0548 00 KAIG3-RFI-TT-SU-0548-00
KAIG3-RFI-TT-S-0655 00 KAIG3-RFI-TT-S-0655-00
KAIG3-RFI-TT-S-0656 00 KAIG3-RFI-TT-S-0656-00
KAIG3-RFI-CO-S-0649 00 KAIG3-RFI-CO-S-0649-00
KAIG3-RFI-CO-S-0648 00 KAIG3-RFI-CO-S-0648-00
KAIG3-RFI-CO-SU-0545 00 KAIG3-RFI-CO-SU-0545-00
KAIG3-RFI-CO-SU-0544 00 KAIG3-RFI-CO-SU-0544-00
KAIG3-RFI-TB-SU-0547 00 KAIG3-RFI-TB-SU-0547-00
KAIG3-RFI-TB-S-0653 00 KAIG3-RFI-TB-S-0653-00
KAIG3-RFI-GN-S-0651 00 KAIG3-RFI-GN-S-0651-00
KAIG3-RFI-TB-S-0652 00 KAIG3-RFI-TB-S-0652-00
KAIG3-RFI-BO-S-0647 00 KAIG3-RFI-BO-S-0647-00
KAIG3-RFI-EC-SU-0539 00 KAIG3-RFI-EC-SU-0539-00
KAIG3-RFI-BO-S-0650 00 KAIG3-RFI-BO-S-0650-00
KAIG3-RFI-TB-S-0642 00 KAIG3-RFI-TB-S-0642-00
KAIG3-RFI-PT-P-0017 00 KAIG3-RFI-PT-P-0017-00
KAIG3-RFI-CO-S-0644 00 KAIG3-RFI-CO-S-0644-00
KAIG3-RFI-CO-S-0643 00 KAIG3-RFI-CO-S-0643-00
KAIG3-RFI-CO-SU-0542 00 KAIG3-RFI-CO-SU-0542-00
KAIG3-RFI-CO-SU-0541 00 KAIG3-RFI-CO-SU-0541-00
KAIG3-RFI-CO-GE-0276 00 KAIG3-RFI-CO-GE-0276-00
KAIG3-RFI-CO-GE-0275 00 KAIG3-RFI-CO-GE-0275-00
KAIG3-RFI-CO-GE-0274 00 KAIG3-RFI-CO-GE-0274-00
KAIG3-RFI-CO-GE-0273 00 KAIG3-RFI-CO-GE-0273-00
KAIG3-RFI-TB-E-0036 00 KAIG3-RFI-TB-E-0036-00
KAIG3-RFI-GN-S-0641 00 KAIG3-RFI-GN-S-0641-00
KAIG3-RFI-EC-GE-0272 00 KAIG3-RFI-EC-GE-0272-00
KAIG3-RFI-EC-SU-0538 00 KAIG3-RFI-EC-SU-0538-00
KAIG3-RFI-TB-S-0640 00 KAIG3-RFI-TB-S-0640-00
KAIG3-RFI-TB-S-0635 00 KAIG3-RFI-TB-S-0635-00
KAIG3-RFI-CO-GE-0269 00 KAIG3-RFI-CO-GE-0269-00
KAIG3-RFI-CO-GE-0268 00 KAIG3-RFI-CO-GE-0268-00
KAIG3-RFI-CO-GE-0267 00 KAIG3-RFI-CO-GE-0267-00
KAIG3-RFI-CO-GE-0266 00 KAIG3-RFI-CO-GE-0266-00
KAIG3-RFI-CO-GE-0265 00 KAIG3-RFI-CO-GE-0265-00
KAIG3-RFI-EC-GE-0264 00 KAIG3-RFI-EC-GE-0264-00
KAIG3-RFI-TT-S-0629 00 KAIG3-RFI-TT-S-0629-00
KAIG3-RFI-CO-SU-0537 00 KAIG3-RFI-CO-SU-0537-00
KAIG3-RFI-CO-SU-0536 00 KAIG3-RFI-CO-SU-0536-00
KAIG3-RFI-EC-GE-0263 00 KAIG3-RFI-EC-GE-0263-00
KAIG3-RFI-TB-S-0639 00 KAIG3-RFI-TB-S-0639-00
KAIG3-RFI-GN-S-0638 00 KAIG3-RFI-GN-S-0638-00
KAIG3-RFI-TB-SU-0532 00 KAIG3-RFI-TB-SU-0532-00
KAIG3-RFI-TB-S-0634 00 KAIG3-RFI-TB-S-0634-00
KAIG3-RFI-EC-SU-0533 00 KAIG3-RFI-EC-SU-0533-00
KAIG3-RFI-CO-S-0637 00 KAIG3-RFI-CO-S-0637-00
KAIG3-RFI-CO-S-0636 00 KAIG3-RFI-CO-S-0636-00
KAIG3-RFI-CO-SU-0534 00 KAIG3-RFI-CO-SU-0534-00
KAIG3-RFI-CO-GE-0262 00 KAIG3-RFI-CO-GE-0262-00
KAAIG3-RFI-CO-GE-0261 00 KAAIG3-RFI-CO-GE-0261-00
KAIG3-RFI-EC-GE-0260 00 KAIG3-RFI-EC-GE-0260-00
KAIG3-RFI-BO-S-0615 00 KAIG3-RFI-BO-S-0615-00
KAIG3-RFI-PT-S-0570 01 KAIG3-RFI-PT-S-0570-01
KAIG3-RFI-CO-S-0633 00 KAIG3-RFI-CO-S-0633-00
KAIG3-RFI-CO-S-0632 00 KAIG3-RFI-CO-S-0632-00
KAIG3-RFI-CO-S-0631 00 KAIG3-RFI-CO-S-0631-00
KAIG3-RFI-CO-S-0630 00 KAIG3-RFI-CO-S-0630-00
KAIG3-RFI-CO-SU-0531 00 KAIG3-RFI-CO-SU-0531-00
KAIG3-RFI-CO-SU-0530 00 KAIG3-RFI-CO-SU-0530-00
KAIG3-RFI-CO-SU-0529 00 KAIG3-RFI-CO-SU-0529-00
KAIG3-RFI-CO-SU-0528 00 KAIG3-RFI-CO-SU-0528-00
KAIG3-RFI-EC-SU-0525 00 KAIG3-RFI-EC-SU-0525-00
KAIG3-RFI-PT-A-0195 00 KAIG3-RFI-PT-A-0195-00
KAIG3-RFI-EC-SU-0520 00 KAIG3-RFI-EC-SU-0520-00
KAIG3-RFI-CO-GE-0259 00 KAIG3-RFI-CO-GE-0259-00
KAIG3-RFI-TT-A-0194 00 KAIG3-RFI-TT-A-0194-00
KAIG3-RFI-TT-A-0193 00 KAIG3-RFI-TT-A-0193-00
KAIG3-RFI-CO-GE-0258 00 KAIG3-RFI-CO-GE-0258-00
KAIG3-RFI-TG-GE-0257 00 KAIG3-RFI-TG-GE-0257-00
KAIG3-RFI-TG-SU-0519 00 KAIG3-RFI-TG-SU-0519-00
KAIG3-RFI-TB-S-0628 00 KAIG3-RFI-TB-S-0628-00
KAIG3-RFI-GN-S-0627 00 KAIG3-RFI-GN-S-0627-00
KAIG3-RFI-PT-S-0554 01 KAIG3-RFI-PT-S-0554-01
KAIG3-RFI-PT-S-0553 01 KAIG3-RFI-PT-S-0553-01
KAIG3-RFI-CO-SU-0518 00 KAIG3-RFI-CO-SU-0518-00
KAIG3-RFI-CO-SU-0517 00 KAIG3-RFI-CO-SU-0517-00
KAIG3-RFI-CO-GE-0256 00 KAIG3-RFI-CO-GE-0256-00
KAIG3-RFI-CO-S-0626 00 KAIG3-RFI-CO-S-0626-00
KAIG3-RFI-CO-S-0625 00 KAIG3-RFI-CO-S-0625-00
KAIG3-RFI-CO-S-0624 00 KAIG3-RFI-CO-S-0624-00
KAIG3-RFI-CO-S-0623 00 KAIG3-RFI-CO-S-0623-00
KAIG3-RFI-CO-SU-0524 00 KAIG3-RFI-CO-SU-0524-00
KAIG3-RFI-CO-SU-0523 00 KAIG3-RFI-CO-SU-0523-00
KAIG3-RFI-CO-SU-0522 00 KAIG3-RFI-CO-SU-0522-00
KAIG3-RFI-PT-P-0016 00 KAIG3-RFI-PT-P-0016-00
KAIG3-RFI-CO-S-0622 00 KAIG3-RFI-CO-S-0622-00
KAIG3-RFI-CO-S-0621 00 KAIG3-RFI-CO-S-0621-00
KAIG3-RFI-CO-SU-0521 00 KAIG3-RFI-CO-SU-0521-00
KAIG3-RFI-GN-S-0620 00 KAIG3-RFI-GN-S-0620-00
KAIG3-RFI-GN-S-0619 00 KAIG3-RFI-GN-S-0619-00
KAIG3-RFI-GN-S-0594 01 KAIG3-RFI-GN-S-0594-01
KAIG3-RFI-PT-S-0550 01 KAIG3-RFI-PT-S-0550-01
KAIG3-RFI-PT-S-0551 01 KAIG3-RFI-PT-S-0551-01
KAIG3-RFI-PT-S-0552 01 KAIG3-RFI-PT-S-0552-01
KAIG3-RFI-GN-S-0593 01 KAIG3-RFI-GN-S-0593-01
KAIG3-RFI-GN-S-0590 01 KAIG3-RFI-GN-S-0590-01
KAIG3-RFI-GN-S-0589 01 KAIG3-RFI-GN-S-0589-01
KAIG3-RFI-TG-GE-0255 00 KAIG3-RFI-TG-GE-0255-00
KAIG3-RFI-CO-GE-0254 00 KAIG3-RFI-CO-GE-0254-00
KAIG3-RFI-TG-SU-0515 00 KAIG3-RFI-TG-SU-0515-00
KAIG3-RFI-CO-SU-0510 00 KAIG3-RFI-CO-SU-0510-00
KAIG3-RFI-CO-S-0618 00 KAIG3-RFI-CO-S-0618-00
KAIG3-RFI-CO-S-0617 00 KAIG3-RFI-CO-S-0617-00
KAIG3-RFI-CO-SU-0516 00 KAIG3-RFI-CO-SU-0516-00
KAIG3-RFI-TB-SU-0515 00 KAIG3-RFI-TB-SU-0515-00
KAIG3-RFI-PT-S-0616 00 KAIG3-RFI-PT-S-0616-00
KAIG3-RFI-TT-P-0015 00 KAIG3-RFI-TT-P-0015-00
KAIG3-RFI-TG-GE-0253 00 KAIG3-RFI-TG-GE-0253-00
KAIG3-RFI-TG-SU-0509 00 KAIG3-RFI-TG-SU-0509-00
KAIG3-RFI-TG-SU-0508 00 KAIG3-RFI-TG-SU-0508-00
KAIG3-RFI-GN-S-0614 00 KAIG3-RFI-GN-S-0614-00
KAIG3-RFI-PT-S-0609 00 KAIG3-RFI-PT-S-0609-00
KAIG3-RFI-PT-A-0192 00 KAIG3-RFI-PT-A-0192-00
KAIG3-RFI-TB-S-0608 00 KAIG3-RFI-TB-S-0608-00
KAIG3-RFI-CO-S-0613 00 KAIG3-RFI-CO-S-0613-00
KAIG3-RFI-CO-S-0612 00 KAIG3-RFI-CO-S-0612-00
KAIG3-RFI-CO-S-0611 00 KAIG3-RFI-CO-S-0611-00
KAIG3-RFI-CO-S-0610 00 KAIG3-RFI-CO-S-0610-00
KAIG3-RFI-CO-SU-0513 00 KAIG3-RFI-CO-SU-0513-00
KAIG3-RFI-CO-SU-0512 00 KAIG3-RFI-CO-SU-0512-00
KAIG3-RFI-CO-SU-0511 00 KAIG3-RFI-CO-SU-0511-00
KAIG3-RFI-TB-E-0035 00 KAIG3-RFI-TB-E-0035-00
KAIG3-RFI-TB-E-0034 00 KAIG3-RFI-TB-E-0034-00
KAIG3-RFI-TB-SU-0510 00 KAIG3-RFI-TB-SU-0510-00
KAIG3-RFI-PT-A-0186 01 KAIG3-RFI-PT-A-0186-01
KAIG3-RFI-TG-GE-0241 00 KAIG3-RFI-TG-GE-0241-00
KAIG3-RFI-TG-SU-0507 00 KAIG3-RFI-TG-SU-0507-00
KAIG3-RFI-TG-SU-0501 00 KAIG3-RFI-TG-SU-0501-00
KAIG3-RFI-TB-S-0571 00 KAIG3-RFI-TB-S-0571-00
KAIG3-RFI-PT-S-0607 00 KAIG3-RFI-PT-S-0607-00
KAIG3-RFI-CO-SU-0506 00 KAIG3-RFI-CO-SU-0506-00
KAIG3-RFI-CO-SU-0505 00 KAIG3-RFI-CO-SU-0505-00
KAIG3-RFI-TB-LC-0024 01 KAIG3-RFI-TB-LC-0024-01
KAIG3-RFI-CO-S-0606 00 KAIG3-RFI-CO-S-0606-00
KAIG3-RFI-CO-S-0605 00 KAIG3-RFI-CO-S-0605-00
KAIG3-RFI-CO-S-0604-00 00 KAIG3-RFI-CO-S-0604-00-00
KAIG3-RFI-CO-S-0603 00 KAIG3-RFI-CO-S-0603-00
KAIG3-RFI-BO-A-0191 00 KAIG3-RFI-BO-A-0191-00
KAIG3-RFI-CO-S-0601 00 KAIG3-RFI-CO-S-0601-00
KAIG3-RFI-CO-S-0600 00 KAIG3-RFI-CO-S-0600-00
KAIG3-RFI-CO-SU-0504 00 KAIG3-RFI-CO-SU-0504-00
KAIG3-RFI-TB-S-0599 00 KAIG3-RFI-TB-S-0599-00
KAIG3-RFI-CO-GE-0249 00 KAIG3-RFI-CO-GE-0249-00
KAIG3-RFI-CO-GE-0250 00 KAIG3-RFI-CO-GE-0250-00
KAIG3-RFI-CO-GE-0248 00 KAIG3-RFI-CO-GE-0248-00
KAIG3-RFI-CO-GE-0247 00 KAIG3-RFI-CO-GE-0247-00
KAIG3-RFI-CO-SU-0503 00 KAIG3-RFI-CO-SU-0503-00
KAIG3-RFI-CO-SU-0502 00 KAIG3-RFI-CO-SU-0502-00
KAIG3-RFI-ZG-GE-0246 00 KAIG3-RFI-ZG-GE-0246-00
KAIG3-RFI-ZG-SU-0498 00 KAIG3-RFI-ZG-SU-0498-00
KAIG3-RFI-TB-P-0014 00 KAIG3-RFI-TB-P-0014-00
KAIG3-RFI-PT-S-0598 00 KAIG3-RFI-PT-S-0598-00
KAIG3-RFI-TB-S-0579 01 KAIG3-RFI-TB-S-0579-01
KAIG3-RFI-PT-S-0597 00 KAIG3-RFI-PT-S-0597-00
KAIG3-RFI-GN-LS-0005 02 KAIG3-RFI-GN-LS-0005-02
KAIG3-RFI-CO-SU-0500 00 KAIG3-RFI-CO-SU-0500-00
KAIG3-RFI-CO-S-0596 00 KAIG3-RFI-CO-S-0596-00
KAIG3-RFI-CO-S-0595 00 KAIG3-RFI-CO-S-0595-00
KAIG3-RFI-CO-SU-0499 00 KAIG3-RFI-CO-SU-0499-00
KAIG3-RFI-PT-A-0187 00 KAIG3-RFI-PT-A-0187-00
KAIG3-RFI-TB-LC-0028 00 KAIG3-RFI-TB-LC-0028-00
KAIG3-RFI-TB-LC-0027 00 KAIG3-RFI-TB-LC-0027-00
KAIG3-RFI-TB-LC-0026 00 KAIG3-RFI-TB-LC-0026-00
KAIG3-RFI-ZG-GE-0245 00 KAIG3-RFI-ZG-GE-0245-00
KAIG3-RFI-TB-LC-0025 00 KAIG3-RFI-TB-LC-0025-00
KAIG3-RFI-ZG-GE-0244 00 KAIG3-RFI-ZG-GE-0244-00
KAIG3-RFI-ZG-SU-0497 00 KAIG3-RFI-ZG-SU-0497-00
KAIG3-RFI-ZG-SU-0496 00 KAIG3-RFI-ZG-SU-0496-00
KAIG3-RFI-TB-E-0033 00 KAIG3-RFI-TB-E-0033-00
KAIG3-RFI-TB-E-0032 00 KAIG3-RFI-TB-E-0032-00
KAIG3-RFI-GN-S-0594 00 KAIG3-RFI-GN-S-0594-00
KAIG3-RFI-GN-S-0593 00 KAIG3-RFI-GN-S-0593-00
KAIG3-RFI-TT-S-0592 00 KAIG3-RFI-TT-S-0592-00
KAIG3-RFI-TB-S-0591 00 KAIG3-RFI-TB-S-0591-00
KAIG3-RFI-GN-S-0590 00 KAIG3-RFI-GN-S-0590-00
KAIG3-RFI-GN-S-0589 00 KAIG3-RFI-GN-S-0589-00
KAIG3-RFI-CO-S-0587 00 KAIG3-RFI-CO-S-0587-00
KAIG3-RFI-CO-S-0586 00 KAIG3-RFI-CO-S-0586-00
KAIG3-RFI-CO-S-0585 00 KAIG3-RFI-CO-S-0585-00
KAIG3-RFI-CO-S-0584 00 KAIG3-RFI-CO-S-0584-00
KAIG3-RFI-CO-SU-0495 00 KAIG3-RFI-CO-SU-0495-00
KAIG3-RFI-CO-SU-0494 00 KAIG3-RFI-CO-SU-0494-00
KAIG3-RFI-CO-SU-0493 00 KAIG3-RFI-CO-SU-0493-00
KAIG3-RFI-PT-A-0190 00 KAIG3-RFI-PT-A-0190-00
KAIG3-RFI-PT-S-0583 00 KAIG3-RFI-PT-S-0583-00
KAIG3-RFI-CO-S-0582 00 KAIG3-RFI-CO-S-0582-00
KAIG3-RFI-CO-S-0581 00 KAIG3-RFI-CO-S-0581-00
KAIG3-RFI-CO-SU-0492 00 KAIG3-RFI-CO-SU-0492-00
KAIG3-RFI-ZG-GE-0243 00 KAIG3-RFI-ZG-GE-0243-00
KAIG3-RFI-ZG-SU-0490 00 KAIG3-RFI-ZG-SU-0490-00
KAIG3-RFI-TB-SU-0477 01 KAIG3-RFI-TB-SU-0477-01
KAIG3-RFI-BO-A-0189 00 KAIG3-RFI-BO-A-0189-00
KAIG3-RFI-PT-SU-0489 00 KAIG3-RFI-PT-SU-0489-00
KAIG3-RFI-TT-S-0580 00 KAIG3-RFI-TT-S-0580-00
KAIG3-RFI-TT-SU-0491 00 KAIG3-RFI-TT-SU-0491-00
KAIG3-RFI-CO-GE-0239 00 KAIG3-RFI-CO-GE-0239-00
KAIG3-RFI-CO-GE-0240 00 KAIG3-RFI-CO-GE-0240-00
KAIG3-RFI-ZG-GE-0238 00 KAIG3-RFI-ZG-GE-0238-00
KAIG3-RFI-ZG-SU-0485 00 KAIG3-RFI-ZG-SU-0485-00
KAIG3-RFI-TB-P-0013 00 KAIG3-RFI-TB-P-0013-00
KAIG3-RFI-PG-GE-0242 00 KAIG3-RFI-PG-GE-0242-00
KAIG3-RFI-PG-SU-0486 00 KAIG3-RFI-PG-SU-0486-00
KAIG3-RFI-TB-S-0579 00 KAIG3-RFI-TB-S-0579-00
KAIG3-RFI-PT-A-0188 00 KAIG3-RFI-PT-A-0188-00
KAIG3-RFI-CO-S-0577 00 KAIG3-RFI-CO-S-0577-00
KAIG3-RFI-CO-S-0576 00 KAIG3-RFI-CO-S-0576-00
KAIG3-RFI-CO-S-0575 00 KAIG3-RFI-CO-S-0575-00
KAIG3-RFI-CO-S-0574 00 KAIG3-RFI-CO-S-0574-00
KAIG3-RFI-CO-SU-0489 00 KAIG3-RFI-CO-SU-0489-00
KAIG3-RFI-CO-SU-0488 00 KAIG3-RFI-CO-SU-0488-00
KAIG3-RFI-CO-SU-0487 00 KAIG3-RFI-CO-SU-0487-00
KAIG3-RFI-CO-GE-0237 00 KAIG3-RFI-CO-GE-0237-00
KAIG3-RFI-CO-GE-0235 00 KAIG3-RFI-CO-GE-0235-00
KAIG3-RFI-TB-LC-0024 00 KAIG3-RFI-TB-LC-0024-00
KAIG3-RFI-TB-E-0031 00 KAIG3-RFI-TB-E-0031-00
KAIG3-RFI-CO-SU-0442 01 KAIG3-RFI-CO-SU-0442-01
KAIG3-RFI-MB-P-0012 00 KAIG3-RFI-MB-P-0012-00
KAIG3-RFI-BO-S-0572 00 KAIG3-RFI-BO-S-0572-00
KAIG3-RFI-BO-S-0573 00 KAIG3-RFI-BO-S-0573-00
KAIG3-RFI-CO-GE-0231 00 KAIG3-RFI-CO-GE-0231-00
KAIG3-RFI-CO-GE-0162 00 KAIG3-RFI-CO-GE-0162-00
KAIG3RFI-CO-GE-0236 00 KAIG3RFI-CO-GE-0236-00
KAIG3-RFI-CO-GE-0234 00 KAIG3-RFI-CO-GE-0234-00
KAIG3-RFI-PT-S-0570 00 KAIG3-RFI-PT-S-0570-00
KAIG3-RFI-PT-A-0186 00 KAIG3-RFI-PT-A-0186-00
KAIG3-RFI-PT-S-0569 00 KAIG3-RFI-PT-S-0569-00
KAIG3-RFI-CO-GE-0233 00 KAIG3-RFI-CO-GE-0233-00
KAIG3-RFI-CO-GE-0228 00 KAIG3-RFI-CO-GE-0228-00
KAIG3-RFI-CO-GE-0223 00 KAIG3-RFI-CO-GE-0223-00
KAIG3-RFI-CO-GE-0222 00 KAIG3-RFI-CO-GE-0222-00
KAIG3-RFI-PG-SU-0484 00 KAIG3-RFI-PG-SU-0484-00
KAIG3-RFI-PG-GE-0230 00 KAIG3-RFI-PG-GE-0230-00
KAIG3-RFI-CO-SU-0483 00 KAIG3-RFI-CO-SU-0483-00
KAIG3-RFI-CO-S-0568 00 KAIG3-RFI-CO-S-0568-00
KAIG3-RFI-CO-S-0567 00 KAIG3-RFI-CO-S-0567-00
KAIG3-RFI-CO-S-0565 00 KAIG3-RFI-CO-S-0565-00
KAIG3-RFI-CO-S-0566 00 KAIG3-RFI-CO-S-0566-00
KAIG3-RFI-TT-SU-0482 00 KAIG3-RFI-TT-SU-0482-00
KAIG3-RFI-TT-S-0563 00 KAIG3-RFI-TT-S-0563-00
KAIG3-RFI-PT-S-0564 00 KAIG3-RFI-PT-S-0564-00
KAIG3-RFI-TT-P-0011 00 KAIG3-RFI-TT-P-0011-00
KAIG3-RFI-PT-S-0562 00 KAIG3-RFI-PT-S-0562-00
KAIG3-RFI-TT-E-0030 00 KAIG3-RFI-TT-E-0030-00
KAIG3-RFI-CO-S-0561 00 KAIG3-RFI-CO-S-0561-00
KAIG3-RFI-CO-S-0560 00 KAIG3-RFI-CO-S-0560-00
KAIG3-RFI-CO-SU-0480 00 KAIG3-RFI-CO-SU-0480-00
KAIG3-RFI-CO-SU-0479 00 KAIG3-RFI-CO-SU-0479-00
KAIG3-RFI-CO-SU-0478 00 KAIG3-RFI-CO-SU-0478-00
KAIG3-RFI-PT-A-0185 00 KAIG3-RFI-PT-A-0185-00
KAIG3-RFI-TB-SU-0477 00 KAIG3-RFI-TB-SU-0477-00
KAIG3-RFI-PG-GE-0232 00 KAIG3-RFI-PG-GE-0232-00
KAIG3-RFI-PG-SU-0474 00 KAIG3-RFI-PG-SU-0474-00
KAIG3-RFI-PT-A-0184 00 KAIG3-RFI-PT-A-0184-00
KAIG3-RFI-PT-S-0540 01 KAIG3-RFI-PT-S-0540-01
KAIG3-RFI-TT-E-0029 00 KAIG3-RFI-TT-E-0029-00
KAIG3-RFI-TT-E-0028 00 KAIG3-RFI-TT-E-0028-00
KAIG3-RFI-TT-E-0027 00 KAIG3-RFI-TT-E-0027-00
KAIG3-RFI-PT-E-0026 00 KAIG3-RFI-PT-E-0026-00
KAIG3-RFI-PT-E-0025 00 KAIG3-RFI-PT-E-0025-00
KAIG3-RFI-PT-E-0024 00 KAIG3-RFI-PT-E-0024-00
KAIG3-RFI-PT-E-0023 00 KAIG3-RFI-PT-E-0023-00
KAIG3-RFI-PT-E-0022 00 KAIG3-RFI-PT-E-0022-00
KAIG3-RFI-CO-SU-0476 00 KAIG3-RFI-CO-SU-0476-00
KAIG3-RFI-CO-S-0559 00 KAIG3-RFI-CO-S-0559-00
KAIG3-RFI-CO-S-0558 00 KAIG3-RFI-CO-S-0558-00
KAIG3-RFI-CO-SU-0475 00 KAIG3-RFI-CO-SU-0475-00
KAIG3-RFI-CO-SU-0473 00 KAIG3-RFI-CO-SU-0473-00
KAIG3-RFI-CO-SU-0472 00 KAIG3-RFI-CO-SU-0472-00
KAIG3-RFI-CO-S-0547 00 KAIG3-RFI-CO-S-0547-00
KAIG3-RFI-CO-SU-0464 00 KAIG3-RFI-CO-SU-0464-00
KAIG3-RFI-PT-A-0183 00 KAIG3-RFI-PT-A-0183-00
KAIG3-RFI-TT-A-0182 00 KAIG3-RFI-TT-A-0182-00
KAIG3-RFI-TB-S-0557 00 KAIG3-RFI-TB-S-0557-00
KAIG3-RFI-PT-S-0556 00 KAIG3-RFI-PT-S-0556-00
KAIG3-RFI-PT-S-0555 00 KAIG3-RFI-PT-S-0555-00
KAIG3-RFI-MB-P-0010 01 KAIG3-RFI-MB-P-0010-01
KAIG3-RFI-PT-S-0554 00 KAIG3-RFI-PT-S-0554-00
KAIG3-RFI-PT-S-0553 00 KAIG3-RFI-PT-S-0553-00
KAIG3-RFI-PT-S-0552 00 KAIG3-RFI-PT-S-0552-00
KAIG3-RFI-PT-S-0551 00 KAIG3-RFI-PT-S-0551-00
KAIG3-RFI-PT-S-0550 00 KAIG3-RFI-PT-S-0550-00
KAIG3-RFI-TB-S-0526 01 KAIG3-RFI-TB-S-0526-01
KAIG3-RFI-MB-E-0021 00 KAIG3-RFI-MB-E-0021-00
KAIG3-RFI-MB-LC-0023 00 KAIG3-RFI-MB-LC-0023-00
KAIG3-RFI-TT-A-0181 00 KAIG3-RFI-TT-A-0181-00
KAIG3-RFI-TB-SU-0471 00 KAIG3-RFI-TB-SU-0471-00
KAIG3-RFI-TB-SU-0470 00 KAIG3-RFI-TB-SU-0470-00
KAIG3-RFI-CO-S-0549 00 KAIG3-RFI-CO-S-0549-00
KAIG3-RFI-CO-SU-0467 00 KAIG3-RFI-CO-SU-0467-00
KAIG3-RFI-CO-GE-0224 00 KAIG3-RFI-CO-GE-0224-00
KAIG3-RFI-CO-GE-0225 00 KAIG3-RFI-CO-GE-0225-00
KAIG3-RFI-CO-SU-0468 00 KAIG3-RFI-CO-SU-0468-00
KAIG3-RFI-CO-GE-0226 00 KAIG3-RFI-CO-GE-0226-00
KAIG3-RFI-CO-GE-0227 00 KAIG3-RFI-CO-GE-0227-00
KAIG3-RFI-CO-SU-0469 00 KAIG3-RFI-CO-SU-0469-00
KAIG3-RFI-CO-S-0548 00 KAIG3-RFI-CO-S-0548-00
KAIG3-RFI-PT-S-0546 00 KAIG3-RFI-PT-S-0546-00
KAIG3-RFI-PT-S-0545 00 KAIG3-RFI-PT-S-0545-00
KAIG3-RFI-CO-SU-0466 00 KAIG3-RFI-CO-SU-0466-00
KAIG3-RFI-CO-SU-0465 00 KAIG3-RFI-CO-SU-0465-00
KAIG3-RFI-CO-GE-0221 00 KAIG3-RFI-CO-GE-0221-00
KAIG3-RFI-CO-GE-0220 00 KAIG3-RFI-CO-GE-0220-00
KAIG3-RFI-CO-GE-0219 00 KAIG3-RFI-CO-GE-0219-00
KAIG3-RFI-CO-GE-0218 00 KAIG3-RFI-CO-GE-0218-00
KAIG3-RFI-CO-SU-0447 01 KAIG3-RFI-CO-SU-0447-01
KAIG3-RFI-CO-S-0531 01 KAIG3-RFI-CO-S-0531-01
KAIG3-RFI-CO-S-0530 01 KAIG3-RFI-CO-S-0530-01
KAIG3-RFI-TB-S-0544 00 KAIG3-RFI-TB-S-0544-00
KAIG3-RFI-TB-S-0543 00 KAIG3-RFI-TB-S-0543-00
KAIG3-RFI-TB-S-0525 01 KAIG3-RFI-TB-S-0525-01
KAIG3-RFI-TB-S-0542 00 KAIG3-RFI-TB-S-0542-00
KAIG3-RFI-TB-SU-0454 00 KAIG3-RFI-TB-SU-0454-00
KAIG3-RFI-TT-A-0179 01 KAIG3-RFI-TT-A-0179-01
KAIG3-RFI-MB-P-0010 00 KAIG3-RFI-MB-P-0010-00
KAIG3-RFI-TB-S-0541 00 KAIG3-RFI-TB-S-0541-00
KAIG3-RFI-CO-SU-0463 00 KAIG3-RFI-CO-SU-0463-00
KAIG3-RFI-CO-SU-0462 00 KAIG3-RFI-CO-SU-0462-00
KAIG3-RFI-CO-SU-0461 00 KAIG3-RFI-CO-SU-0461-00
KAIG3-RFI-TT-A-0180 00 KAIG3-RFI-TT-A-0180-00
KAIG3-RFI-PT-S-0540 00 KAIG3-RFI-PT-S-0540-00
KAIG3-RFI-CO-GE-0217 00 KAIG3-RFI-CO-GE-0217-00
KAIG3-RFI-CO-GE-0216 00 KAIG3-RFI-CO-GE-0216-00
KAIG3-RFI-CO-GE-0215 00 KAIG3-RFI-CO-GE-0215-00
KAIG3-RFI-CO-GE-0214 00 KAIG3-RFI-CO-GE-0214-00
KAIG3-RFI-TT-S-0539 00 KAIG3-RFI-TT-S-0539-00
KAIG3-RFI-CO-SU-0458 00 KAIG3-RFI-CO-SU-0458-00
KAIG3-RFI-CO-SU-0457 00 KAIG3-RFI-CO-SU-0457-00
KAIG3-RFI-CO-GE-0213 00 KAIG3-RFI-CO-GE-0213-00
KAIG3-RFI-CO-GE-0212 00 KAIG3-RFI-CO-GE-0212-00
KAIG3-RFI-CO-SU-0459 00 KAIG3-RFI-CO-SU-0459-00
KAIG3-RFI-WG-GE-0206 00 KAIG3-RFI-WG-GE-0206-00
KAIG3-RFI-WG-SU-0456 00 KAIG3-RFI-WG-SU-0456-00
KAIG3-RFI-AG-GE-0211 00 KAIG3-RFI-AG-GE-0211-00
KAIG3-RFI-AG-GE-0210 00 KAIG3-RFI-AG-GE-0210-00
KAIG3-RFI-AG-GE-0209 00 KAIG3-RFI-AG-GE-0209-00
KAIG3-RFI-AG-GE-0208 00 KAIG3-RFI-AG-GE-0208-00
KAIG3-RFI-AG-GE-0207 00 KAIG3-RFI-AG-GE-0207-00
KAIG3-RFI-TT-P-0009 00 KAIG3-RFI-TT-P-0009-00
KAIG3-RFI-TT-A-0179 00 KAIG3-RFI-TT-A-0179-00
KAIG3-RFI-MB-S-0532 00 KAIG3-RFI-MB-S-0532-00
KAIG3-RFI-CO-GE-0205 00 KAIG3-RFI-CO-GE-0205-00
KAIG3-RFI-CO-GE-0204 00 KAIG3-RFI-CO-GE-0204-00
KAIG3-RFI-CO-GE-0203 00 KAIG3-RFI-CO-GE-0203-00
KAIG3-RFI-CO-GE-0202 00 KAIG3-RFI-CO-GE-0202-00
KAIG3-RFI-WG-GE-0201 00 KAIG3-RFI-WG-GE-0201-00
KAIG3-RFI-WG-GE-0200 00 KAIG3-RFI-WG-GE-0200-00
KAIG3-RFI-CO-S-0531 00 KAIG3-RFI-CO-S-0531-00
KAIG3-RFI-CO-SU-0451 00 KAIG3-RFI-CO-SU-0451-00
KAIG3-RFI-CO-SU-0450 00 KAIG3-RFI-CO-SU-0450-00
KAIG3-RFI-CO-SU-0449 00 KAIG3-RFI-CO-SU-0449-00
KAIG3-RFI-WG-SU-0444 00 KAIG3-RFI-WG-SU-0444-00
KAIG3-RFI-WG-SU-0443 00 KAIG3-RFI-WG-SU-0443-00
KAIG3-RFI-CO-S-0530 00 KAIG3-RFI-CO-S-0530-00
KAIG3-RFI-CO-SU-0448 00 KAIG3-RFI-CO-SU-0448-00
KAIG3-RFI-CO-SU-0447 00 KAIG3-RFI-CO-SU-0447-00
KAIG3-RFI-CO-S-0529 00 KAIG3-RFI-CO-S-0529-00
KAIG3-RFI-CO-S-0528 00 KAIG3-RFI-CO-S-0528-00
KAIG3-RFI-WG-GE-0199 00 KAIG3-RFI-WG-GE-0199-00
KAIG3-RFI-WG-GE-0196 00 KAIG3-RFI-WG-GE-0196-00
KAIG3-RFI-CO-SU-0446 00 KAIG3-RFI-CO-SU-0446-00
KAIG3-RFI-CO-SU-0442 00 KAIG3-RFI-CO-SU-0442-00
KAIG3-RFI-WG-SU-0441 00 KAIG3-RFI-WG-SU-0441-00
KAIG3-RFI-WG-SU-0440 00 KAIG3-RFI-WG-SU-0440-00
KAIG3-RFI-PT-SU-0445 00 KAIG3-RFI-PT-SU-0445-00
KAIG3-RFI-PT-S-0527 00 KAIG3-RFI-PT-S-0527-00
KAIG3-RFI-TT-A-0178 00 KAIG3-RFI-TT-A-0178-00
KAIG3-RFI-PT-A-0177 00 KAIG3-RFI-PT-A-0177-00
KAIG3-RFI-BO-S-0487 01 KAIG3-RFI-BO-S-0487-01
KAIG3-RFI-TB-E-0020 00 KAIG3-RFI-TB-E-0020-00
KAIG3-RFI-TB-E-0019 00 KAIG3-RFI-TB-E-0019-00
KAIG3-RFI-TB-LC-0022 00 KAIG3-RFI-TB-LC-0022-00
KAIG3-RFI-TB-LC-0021 00 KAIG3-RFI-TB-LC-0021-00
KAIG3-RFI-TB-LC-0020 00 KAIG3-RFI-TB-LC-0020-00
KAIG3-RFI-TB-LC-0019 00 KAIG3-RFI-TB-LC-0019-00
KAIG3-RFI-PT-A-0176 00 KAIG3-RFI-PT-A-0176-00
KAIG3-RFI-TB-0008 00 KAIG3-RFI-TB-0008-00
KAIG3-RFI-TB-S-0526 00 KAIG3-RFI-TB-S-0526-00
KAIG3-RFI-TB-S-0525 00 KAIG3-RFI-TB-S-0525-00
KAIG3-RFI-PT-A-0168 02 KAIG3-RFI-PT-A-0168-02
KAIG3-RFI-WG-GE-0195 00 KAIG3-RFI-WG-GE-0195-00
KAIG3-RFI-AG-SU-0408 00 KAIG3-RFI-AG-SU-0408-00
KAIG3-RFI-TB-P-0007 00 KAIG3-RFI-TB-P-0007-00
KAIG3-RFI-PT-S-0524 00 KAIG3-RFI-PT-S-0524-00
KAIG3-RFI-WG-GE-0197 00 KAIG3-RFI-WG-GE-0197-00
KAIG3-RFI-AG-SU-0377 00 KAIG3-RFI-AG-SU-0377-00
KAIG3-RFI-AG-SU-0307 00 KAIG3-RFI-AG-SU-0307-00
KAIG3-RFI-CO-S-0521 00 KAIG3-RFI-CO-S-0521-00
KAIG3-RFI-CO-S-0520 00 KAIG3-RFI-CO-S-0520-00
KAIG3-RFI-CO-S-0519 00 KAIG3-RFI-CO-S-0519-00
KAIG3-RFI-CO-S-0518 00 KAIG3-RFI-CO-S-0518-00
KAIG3-RFI-CO-GE-0198 00 KAIG3-RFI-CO-GE-0198-00
KAIG3-RFI-CO-SU-0439 00 KAIG3-RFI-CO-SU-0439-00
KAIG3-RFI-CO-SU-0438 00 KAIG3-RFI-CO-SU-0438-00
KAIG3-RFI-CO-SU-0437 00 KAIG3-RFI-CO-SU-0437-00
KAIG3-RFI-CO-SU-0436 00 KAIG3-RFI-CO-SU-0436-00
KAIG3-RFI-CO-SU-0435 00 KAIG3-RFI-CO-SU-0435-00
KAIG3-RFI-TB-S-0522 00 KAIG3-RFI-TB-S-0522-00
KAIG3-RFI-CO-GE-0194 00 KAIG3-RFI-CO-GE-0194-00
KAIG3-RFI-CO-GE-0193 00 KAIG3-RFI-CO-GE-0193-00
KAIG3-RFI-WG-GE-0192 00 KAIG3-RFI-WG-GE-0192-00
KAIG3-RFI-CO-GE-0191 00 KAIG3-RFI-CO-GE-0191-00
KAIG3-RFI-CO-GE-0190 00 KAIG3-RFI-CO-GE-0190-00
KAIG3-RFI-CO-GE-0189 00 KAIG3-RFI-CO-GE-0189-00
KAIG3-RFI-CO-GE-0188 00 KAIG3-RFI-CO-GE-0188-00
KAIG3-RFI-CO-SU-0434 00 KAIG3-RFI-CO-SU-0434-00
KAIG3-RFI-AG-SU-0433 00 KAIG3-RFI-AG-SU-0433-00
KAIG3-RFI-AG-SU-0425 00 KAIG3-RFI-AG-SU-0425-00
KAIG3-RFI-CO-S-0477 01 KAIG3-RFI-CO-S-0477-01
KAIG3-RFI-CO-S-0476 01 KAIG3-RFI-CO-S-0476-01
KAIG3-RFI-CO-SU-0385 01 KAIG3-RFI-CO-SU-0385-01
KAIG3-RFI-TB-S-0517 00 KAIG3-RFI-TB-S-0517-00
KAIG3-RFI-BO-S-0514 00 KAIG3-RFI-BO-S-0514-00
KAIG3-RFI-BO-S-0513 00 KAIG3-RFI-BO-S-0513-00
KAIG3-RFI-CO-S-0516 00 KAIG3-RFI-CO-S-0516-00
KAIG3-RFI-CO-S-0515 00 KAIG3-RFI-CO-S-0515-00
KAIG3-RFI-CO-SU-0432 00 KAIG3-RFI-CO-SU-0432-00
KAIG3-RFI-CO-SU-0431 00 KAIG3-RFI-CO-SU-0431-00
KAIG3-RFI-PT-A-0168 01 KAIG3-RFI-PT-A-0168-01
KAIG3-RFI-WT-S-0386 01 KAIG3-RFI-WT-S-0386-01
KAIG3-RFI-BO-S-0512 00 KAIG3-RFI-BO-S-0512-00
KAIG3-RFI-TB-S-0503 00 KAIG3-RFI-TB-S-0503-00
KAIG3-RFI-TB-SU-0430 00 KAIG3-RFI-TB-SU-0430-00
KAIG3-RFI-TB-E-0018 00 KAIG3-RFI-TB-E-0018-00
KAIG3-RFI-TB-LC-0018 00 KAIG3-RFI-TB-LC-0018-00
KAIG3-RFI-PT-E-0017 00 KAIG3-RFI-PT-E-0017-00
KAIG3-RFI-TT-A-0175 00 KAIG3-RFI-TT-A-0175-00
KAIG3-RFI-CO-S-0511 00 KAIG3-RFI-CO-S-0511-00
KAIG3-RFI-CO-S-0510 00 KAIG3-RFI-CO-S-0510-00
KAIG3-RFI-CO-SU-0429 00 KAIG3-RFI-CO-SU-0429-00
KAIG3-RFI-WG-SU-0424 00 KAIG3-RFI-WG-SU-0424-00
KAIG3-RFI-MB-S-0509 00 KAIG3-RFI-MB-S-0509-00
KAIG3-RFI-PT-A-0174 00 KAIG3-RFI-PT-A-0174-00
KAIG3-RFI-CO-GE-0187 00 KAIG3-RFI-CO-GE-0187-00
KAIG3-RFI-CO-GE-0186 00 KAIG3-RFI-CO-GE-0186-00
KAIG3-RFI-CO-GE-0185 00 KAIG3-RFI-CO-GE-0185-00
KAIG3-RFI-CO-GE-0184 00 KAIG3-RFI-CO-GE-0184-00
KAIG3-RFI-CO-GE-0183 00 KAIG3-RFI-CO-GE-0183-00
KAIG3-RFI-CO-GE-0182 00 KAIG3-RFI-CO-GE-0182-00
KAIG3-RFI-CO-SU-0423 00 KAIG3-RFI-CO-SU-0423-00
KAIG3-RFI-PT-E-0016 00 KAIG3-RFI-PT-E-0016-00
KAIG3-RFI-CO-S-0507 00 KAIG3-RFI-CO-S-0507-00
KAIG3-RFI-CO-S-0506 00 KAIG3-RFI-CO-S-0506-00
KAIG3-RFI-CO-S-0505 00 KAIG3-RFI-CO-S-0505-00
KAIG3-RFI-CO-S-0504 00 KAIG3-RFI-CO-S-0504-00
KAIG3-RFI-CO-SU-0428 00 KAIG3-RFI-CO-SU-0428-00
KAIG3-RFI-CO-SU-0427 00 KAIG3-RFI-CO-SU-0427-00
KAIG3-RFI-CO-SU-0426 00 KAIG3-RFI-CO-SU-0426-00
KAIG3-RFI-CO-GE-0181 00 KAIG3-RFI-CO-GE-0181-00
KAIG3-RFI-CO-SU-0421 00 KAIG3-RFI-CO-SU-0421-00
KAIG3-RFI-TB-S-0508 00 KAIG3-RFI-TB-S-0508-00
KAIG3-RFI-CO-GE-0180 00 KAIG3-RFI-CO-GE-0180-00
KAIG3-RFI-CO-SU-0416 00 KAIG3-RFI-CO-SU-0416-00
KAIG3-RFI-CO-SU-0413 00 KAIG3-RFI-CO-SU-0413-00
KAIG3-RFI-TB-SU-0422 00 KAIG3-RFI-TB-SU-0422-00
KAIG3-RFI-TB-S-0502 00 KAIG3-RFI-TB-S-0502-00
KAIG3-RFI-MB-SU-0417 00 KAIG3-RFI-MB-SU-0417-00
KAIG3-RFI-TB-S-0488 00 KAIG3-RFI-TB-S-0488-00
KAIG3-RFI-CO-S-0501 00 KAIG3-RFI-CO-S-0501-00
KAIG3-RFI-CO-S-0500 00 KAIG3-RFI-CO-S-0500-00
KAIG3-RFI-CO-S-0499 00 KAIG3-RFI-CO-S-0499-00
KAIG3-RFI-CO-S-0498 00 KAIG3-RFI-CO-S-0498-00
KAIG3-RFI-PT-A-0173 00 KAIG3-RFI-PT-A-0173-00
KAIG3-RFI-BO-A-0172 00 KAIG3-RFI-BO-A-0172-00
KAIG3-RFI-CO-SU-0420 00 KAIG3-RFI-CO-SU-0420-00
KAIG3-RFI-CO-SU-0419 00 KAIG3-RFI-CO-SU-0419-00
KAIG3-RFI-CO-SU-0418 00 KAIG3-RFI-CO-SU-0418-00
KAIG3-RFI-WG-SU-0415 00 KAIG3-RFI-WG-SU-0415-00
KAIG3-RFI-WG-SU-0414 00 KAIG3-RFI-WG-SU-0414-00
KAIG3-RFI-TB-S-0497 00 KAIG3-RFI-TB-S-0497-00
KAIG3-RFI-PT-S-0496 00 KAIG3-RFI-PT-S-0496-00
KAIG3-RFI-MB-S-0495 00 KAIG3-RFI-MB-S-0495-00
KAIG3-RFI-MB-S-0494 00 KAIG3-RFI-MB-S-0494-00
KAIG3-RFI-CO-GE-0179 00 KAIG3-RFI-CO-GE-0179-00
KAIG3-RFI-CO-GE-0161 00 KAIG3-RFI-CO-GE-0161-00
KAIG3-RFI-PT-S-0493 00 KAIG3-RFI-PT-S-0493-00
KAIG3-RFI-CO-SU-0412 00 KAIG3-RFI-CO-SU-0412-00
KAIG3-RFI-CO-SU-0411 00 KAIG3-RFI-CO-SU-0411-00
KAIG3-RFI-CO-SU-0410 00 KAIG3-RFI-CO-SU-0410-00
KAIG3-RFI-CO-SU-0409 00 KAIG3-RFI-CO-SU-0409-00
KAIG3-RFI-CO-GE-0178 00 KAIG3-RFI-CO-GE-0178-00
KAIG3-RFI-CO-GE-0177 00 KAIG3-RFI-CO-GE-0177-00
KAIG3-RFI-CO-GE-0176 00 KAIG3-RFI-CO-GE-0176-00
KAIG3-RFI-CO-SU-0400 00 KAIG3-RFI-CO-SU-0400-00
KAIG3-RFI-CO-SU-0399 00 KAIG3-RFI-CO-SU-0399-00
KAIG3-RFI-PT-S-0492 00 KAIG3-RFI-PT-S-0492-00
KAIG3-RFI-GN-SU-0357 01 KAIG3-RFI-GN-SU-0357-01
KAIG3-RFI-CO-SU-0407 00 KAIG3-RFI-CO-SU-0407-00
KAIG3-RFI-CO-SU-0406 00 KAIG3-RFI-CO-SU-0406-00
KAIG3-RFI-CO-SU-0405 00 KAIG3-RFI-CO-SU-0405-00
KAIG3-RFI-TB-SU-0404 00 KAIG3-RFI-TB-SU-0404-00
KAIG3-RFI-TB-S-0491 00 KAIG3-RFI-TB-S-0491-00
KAIG3-RFI-CO-GE-0175 00 KAIG3-RFI-CO-GE-0175-00
KAIG3-RFI-CO-SU-0398 00 KAIG3-RFI-CO-SU-0398-00
KAIG3-RFI-MB-E-0015 00 KAIG3-RFI-MB-E-0015-00
KAIG3-RFI-BO-S-0457 01 KAIG3-RFI-BO-S-0457-01
KAIG3-RFI-MB-SU-0403 00 KAIG3-RFI-MB-SU-0403-00
KAIG3-RFI-CO-GE-0174 00 KAIG3-RFI-CO-GE-0174-00
KAIG3-RFI-CO-SU-0397 00 KAIG3-RFI-CO-SU-0397-00
KAIG3-RFI-CO-S-0490 00 KAIG3-RFI-CO-S-0490-00
KAIG3-RFI-CO-S-0489 00 KAIG3-RFI-CO-S-0489-00
KAIG3-RFI-CO-SU-0402 00 KAIG3-RFI-CO-SU-0402-00
KAIG3-RFI-BO-A-0169 01 KAIG3-RFI-BO-A-0169-01
KAIG3-RFI-BO-A-0149 02 KAIG3-RFI-BO-A-0149-02
KAIG3-RFI-BO-S-0487 00 KAIG3-RFI-BO-S-0487-00
KAIG3-RFI-BO-S-0436 00 KAIG3-RFI-BO-S-0436-00
KAIG3-RFI-PG-SU-0401 00 KAIG3-RFI-PG-SU-0401-00
KAIG3-RFI-CO-GE-0173 00 KAIG3-RFI-CO-GE-0173-00
KAIG3-RFI-CO-GE-0172 00 KAIG3-RFI-CO-GE-0172-00
KAIG3-RFI-CO-GE-0171 00 KAIG3-RFI-CO-GE-0171-00
KAIG3-RFI-CO-GE-0170-00 00 KAIG3-RFI-CO-GE-0170-00-00
KAIG3-RFI-CO-SU-0393 00 KAIG3-RFI-CO-SU-0393-00
KAIG3-RFI-CO-SU-0392 00 KAIG3-RFI-CO-SU-0392-00
KAIG3-RFI-CO-GE-0169 00 KAIG3-RFI-CO-GE-0169-00
KAIG3-RFI-CO-SU-0389 00 KAIG3-RFI-CO-SU-0389-00
KAIG3-RFI-CO-S-0486 00 KAIG3-RFI-CO-S-0486-00
KAIG3-RFI-CO-S-0485 00 KAIG3-RFI-CO-S-0485-00
KAIG3-RFI-CO-SU-0396 00 KAIG3-RFI-CO-SU-0396-00
KAIG3-RFI-CO-SU-0395 00 KAIG3-RFI-CO-SU-0395-00
KAIG3-RFI-CO-SU-0394 00 KAIG3-RFI-CO-SU-0394-00
KAIG3-RFI-CO-GE-0167 00 KAIG3-RFI-CO-GE-0167-00
KAIG3-RFI-CO-GE-0166 00 KAIG3-RFI-CO-GE-0166-00
KAIG3-RFI-CO-SU-0387 00 KAIG3-RFI-CO-SU-0387-00
KAIG3-RFI-TB-S-0484 00 KAIG3-RFI-TB-S-0484-00
KAIG3-RFI-PT-S-0481 00 KAIG3-RFI-PT-S-0481-00
KAIG3-RFI-GN-SU-0391 00 KAIG3-RFI-GN-SU-0391-00
KAIG3-RFI-CO-GE-0168 00 KAIG3-RFI-CO-GE-0168-00
KAIG3-RFI-CO-SU-0388 00 KAIG3-RFI-CO-SU-0388-00
KAIG3-RFI-TB-S-0483 00 KAIG3-RFI-TB-S-0483-00
KAIG3-RFI-PT-S-0480 00 KAIG3-RFI-PT-S-0480-00
KAIG3-RFI-CO-GE-0165 00 KAIG3-RFI-CO-GE-0165-00
KAIG3-RFI-CO-GE-0164 00 KAIG3-RFI-CO-GE-0164-00
KAIG3-RFI-CO-SU-0386 00 KAIG3-RFI-CO-SU-0386-00
KAIG3-RFI-CO-S-0479 00 KAIG3-RFI-CO-S-0479-00
KAIG3-RFI-CO-S-0478 00 KAIG3-RFI-CO-S-0478-00
KAIG3-RFI-CO-S-0477 00 KAIG3-RFI-CO-S-0477-00
KAIG3-RFI-CO-S-0476 00 KAIG3-RFI-CO-S-0476-00
KAIG3-RFI-CO-S-0475 00 KAIG3-RFI-CO-S-0475-00
KAIG3-RFI-CO-S-0474 00 KAIG3-RFI-CO-S-0474-00
KAIG3-RFI-CO-SU-0390 00 KAIG3-RFI-CO-SU-0390-00
KAIG3-RFI-CO-SU-0385 00 KAIG3-RFI-CO-SU-0385-00
KAIG3-RFI-CO-SU-0384 00 KAIG3-RFI-CO-SU-0384-00
KAIG3-RFI-BO-S-0473 00 KAIG3-RFI-BO-S-0473-00
KAIG3-RFI-TB-SU-0383 00 KAIG3-RFI-TB-SU-0383-00
KAIG3-RFI-MB-SU-0382 00 KAIG3-RFI-MB-SU-0382-00
KAIG3-RFI-PT-S-0472 00 KAIG3-RFI-PT-S-0472-00
KAIG3-RFI-PT-S-0471 00 KAIG3-RFI-PT-S-0471-00
KAIG3-RFI-TT-S-0470 00 KAIG3-RFI-TT-S-0470-00
KAIG3-RFI-TT-S-0469 00 KAIG3-RFI-TT-S-0469-00
KAIG3-RFI-CO-GE-0163 00 KAIG3-RFI-CO-GE-0163-00
KAIG3-RFI-CO-S-0468 00 KAIG3-RFI-CO-S-0468-00
KAIG3-RFI-CO-S-0467 00 KAIG3-RFI-CO-S-0467-00
KAIG3-RFI-CO-SU-0381 00 KAIG3-RFI-CO-SU-0381-00
KAIG3-RFI-TB-S-0464 00 KAIG3-RFI-TB-S-0464-00
KAIG3-RFI-GN-SU-0379 00 KAIG3-RFI-GN-SU-0379-00
KAIG3-RFI-CO-S-0466 00 KAIG3-RFI-CO-S-0466-00
KAIG3-RFI-CO-S-0465 00 KAIG3-RFI-CO-S-0465-00
KAIG3-RFI-CO-SU-0380 00 KAIG3-RFI-CO-SU-0380-00
KAIG3-RFI-MB-SU-0378 00 KAIG3-RFI-MB-SU-0378-00
KAIG3-RFI-TB-E-0014 00 KAIG3-RFI-TB-E-0014-00
KAIG3-RFI-MB-S-0463 00 KAIG3-RFI-MB-S-0463-00
KAIG3-RFI-MB-S-0462 00 KAIG3-RFI-MB-S-0462-00
KAIG3-RFI-MB-S-0461 00 KAIG3-RFI-MB-S-0461-00
KAIG3-RFI-PT-S-0460 00 KAIG3-RFI-PT-S-0460-00
KAIG3-RFI-PT-S-0459 00 KAIG3-RFI-PT-S-0459-00
KAIG3-RFI-CO-GE-0160 00 KAIG3-RFI-CO-GE-0160-00
KAIG3-RFI-CO-GE-0159 00 KAIG3-RFI-CO-GE-0159-00
KAIG3-RFI-CO-GE-0158 00 KAIG3-RFI-CO-GE-0158-00
KAIG3-RFI-CO-GE-0157 00 KAIG3-RFI-CO-GE-0157-00
KAIG3-RFI-CO-GE-0156 00 KAIG3-RFI-CO-GE-0156-00
KAIG3-RFI-CO-GE-0155 00 KAIG3-RFI-CO-GE-0155-00
KAIG3-RFI-CO-GE-0154 00 KAIG3-RFI-CO-GE-0154-00
KAIG3-RFI-CO-SU-0375 00 KAIG3-RFI-CO-SU-0375-00
KAIG3-RFI-CO-SU-0374 00 KAIG3-RFI-CO-SU-0374-00
KAIG3-RFI-CO-SU-0373 00 KAIG3-RFI-CO-SU-0373-00
KAIG3-RFI-CO-SU-0372 00 KAIG3-RFI-CO-SU-0372-00
KAIG3-RFI-CO-S-0458 00 KAIG3-RFI-CO-S-0458-00
KAIG3-RFI-CO-SU-0376 00 KAIG3-RFI-CO-SU-0376-00
KAIG3-RFI-CO-GE-0153 00 KAIG3-RFI-CO-GE-0153-00
KAIG3-RFI-CO-SU-0366 00 KAIG3-RFI-CO-SU-0366-00
KAIG3-RFI-TB-E-0013 00 KAIG3-RFI-TB-E-0013-00
KAIG3-RFI-TB-LC-0017 00 KAIG3-RFI-TB-LC-0017-00
KAIG3-RFI-TB-LC-0016 00 KAIG3-RFI-TB-LC-0016-00
KAIG3-RFI-TB-LC-0015 00 KAIG3-RFI-TB-LC-0015-00
KAIG3-RFI-TB-LC-0014 00 KAIG3-RFI-TB-LC-0014-00
KAIG3-RFI-TB-SU-0371 00 KAIG3-RFI-TB-SU-0371-00
KAIG3-RFI-TT-S-0456 00 KAIG3-RFI-TT-S-0456-00
KAIG3-RFI-TT-S-0455 00 KAIG3-RFI-TT-S-0455-00
KAIG3-RFI-BO-S-0457 00 KAIG3-RFI-BO-S-0457-00
KAIG3-RFI-CO-GE-0152 00 KAIG3-RFI-CO-GE-0152-00
KAIG3-RFI-CO-SU-0365 00 KAIG3-RFI-CO-SU-0365-00
KAIG3-RFI-CO-S-0454 00 KAIG3-RFI-CO-S-0454-00
KAIG3-RFI-CO-S-0453 00 KAIG3-RFI-CO-S-0453-00
KAIG3-RFI-CO-SU-0370 00 KAIG3-RFI-CO-SU-0370-00
KAIG3-RFI-CO-SU-0369 00 KAIG3-RFI-CO-SU-0369-00
KAIG3-RFI-MB-S-0452 00 KAIG3-RFI-MB-S-0452-00
KAIG3-RFI-CO-GE-0151 00 KAIG3-RFI-CO-GE-0151-00
KAIG3-RFI-CO-GE-0150 00 KAIG3-RFI-CO-GE-0150-00
KAIG3-RFI-CO-GE-0149 00 KAIG3-RFI-CO-GE-0149-00
KAIG3-RFI-CO-GE-0148 00 KAIG3-RFI-CO-GE-0148-00
KAIG3-RFI-CO-GE-0147 00 KAIG3-RFI-CO-GE-0147-00
KAIG3-RFI-CO-GE-0145 00 KAIG3-RFI-CO-GE-0145-00
KAIG3-RFI-MB-S-0451 00 KAIG3-RFI-MB-S-0451-00
KAIG3-RFI-MB-S-0450 00 KAIG3-RFI-MB-S-0450-00
KAIG3-RFI-MB-SU-0368 00 KAIG3-RFI-MB-SU-0368-00
KAIG3-RFI-PT-S-0449 00 KAIG3-RFI-PT-S-0449-00
KAIG3-RFI-BO-S-0448 00 KAIG3-RFI-BO-S-0448-00
KAIG3-RFI-CO-S-0447 00 KAIG3-RFI-CO-S-0447-00
KAIG3-RFI-CO-S-0444 00 KAIG3-RFI-CO-S-0444-00
KAIG3-RFI-CO-SU-0367 00 KAIG3-RFI-CO-SU-0367-00
KAIG3-RFI-CO-SU-0364 00 KAIG3-RFI-CO-SU-0364-00
KAIG3-RFI-CO-SU-0360 00 KAIG3-RFI-CO-SU-0360-00
KAIG3-RFI-TT-A-0159 01 KAIG3-RFI-TT-A-0159-01
KAIG3-RFI-PT-S-0446 00 KAIG3-RFI-PT-S-0446-00
KAIG3-RFI-TB-S-0445 00 KAIG3-RFI-TB-S-0445-00
KAIG3-RFI-CO-GE-0146 00 KAIG3-RFI-CO-GE-0146-00
KAIG3-RFI-CO-S-0443 00 KAIG3-RFI-CO-S-0443-00
KAIG3-RFI-CO-S-0442 00 KAIG3-RFI-CO-S-0442-00
KAIG3-RFI-CO-SU-0363 00 KAIG3-RFI-CO-SU-0363-00
KAIG3-RFI-TB-SU-0362 00 KAIG3-RFI-TB-SU-0362-00
KAIG3-RFI-GN-LS-0005 01 KAIG3-RFI-GN-LS-0005-01
KAIG3-RFI-CO-GE-0141 00 KAIG3-RFI-CO-GE-0141-00
KAIG3-RFI-CO-GE-0144 00 KAIG3-RFI-CO-GE-0144-00
KAIG3-RFI-CO-GE-0143 00 KAIG3-RFI-CO-GE-0143-00
KAIG3-RFI-CO-GE-0142 00 KAIG3-RFI-CO-GE-0142-00
KAIG3-RFI-CO-S-0439 00 KAIG3-RFI-CO-S-0439-00
KAIG3-RFI-CO-S-0438 00 KAIG3-RFI-CO-S-0438-00
KAIG3-RFI-CO-SU-0361 00 KAIG3-RFI-CO-SU-0361-00
KAIG3-RFI-CO-SU-0359 00 KAIG3-RFI-CO-SU-0359-00
KAIG3-RFI-CO-SU-0358 00 KAIG3-RFI-CO-SU-0358-00
KAIG3-RFI-BO-A-0170 00 KAIG3-RFI-BO-A-0170-00
KAIG3-RFI-BO-A-0169 00 KAIG3-RFI-BO-A-0169-00
KAIG3-RFI-BO-A-0163 01 KAIG3-RFI-BO-A-0163-01
KAIG3-RFI-TB-P-0006 00 KAIG3-RFI-TB-P-0006-00
KAIG3-RFI-PT-A-0168 00 KAIG3-RFI-PT-A-0168-00
KAIG3-RFI-PT-A-0167 00 KAIG3-RFI-PT-A-0167-00
KAIG3-RFI-GN-SU-0357 00 KAIG3-RFI-GN-SU-0357-00
KAIG3-RFI-BO-S-0437 00 KAIG3-RFI-BO-S-0437-00
KAIG3-RFI-BO-S-0435 00 KAIG3-RFI-BO-S-0435-00
KAIG3-RFI-TT-A-0166 00 KAIG3-RFI-TT-A-0166-00
KAIG3-RFI-CO-GE-0140 00 KAIG3-RFI-CO-GE-0140-00
KAIG3-RFI-CO-GE-0139 00 KAIG3-RFI-CO-GE-0139-00
KAIG3-RFI-CO-GE-0138 00 KAIG3-RFI-CO-GE-0138-00
KAIG3-RFI-BO-S-0434 00 KAIG3-RFI-BO-S-0434-00
KAIG3-RFI-CO-GE-0137 00 KAIG3-RFI-CO-GE-0137-00
KAIG3-RFI-CO-S-0433 00 KAIG3-RFI-CO-S-0433-00
KAIG3-RFI-CO-S-0432 00 KAIG3-RFI-CO-S-0432-00
KAIG3-RFI-CO-SU-0356 00 KAIG3-RFI-CO-SU-0356-00
KAIG3-RFI-CO-SU-0355 00 KAIG3-RFI-CO-SU-0355-00
KAIG3-RFI-CO-SU-0354-00 00 KAIG3-RFI-CO-SU-0354-00-00
KAIG3-RFI-TB-S-0431 00 KAIG3-RFI-TB-S-0431-00
KAIG3-RFI-PT-S-0430 00 KAIG3-RFI-PT-S-0430-00
KAIG3-RFI-CO-S-0430 00 KAIG3-RFI-CO-S-0430-00
KAIG3-RFI-CO-GE-0136 00 KAIG3-RFI-CO-GE-0136-00
KAIG3-RFI-CO-GE-0135 00 KAIG3-RFI-CO-GE-0135-00
KAIG3-RFI-CO-S-0429 00 KAIG3-RFI-CO-S-0429-00
KAIG3-RFI-CO-S-0428 00 KAIG3-RFI-CO-S-0428-00
KAIG3-RFI-CO-SU-0353 00 KAIG3-RFI-CO-SU-0353-00
KAIG3-RFI-CO-SU-0352 00 KAIG3-RFI-CO-SU-0352-00
KAIG3-RFI-PT-S-0427 00 KAIG3-RFI-PT-S-0427-00
KAIG3-RFI-BO-S-0424 00 KAIG3-RFI-BO-S-0424-00
KAIG3-RFI-PT-P-0005 00 KAIG3-RFI-PT-P-0005-00
KAIG3-RFI-CO-GE-0134 00 KAIG3-RFI-CO-GE-0134-00
KAIG3-RFI-CO-GE-0131 00 KAIG3-RFI-CO-GE-0131-00
KAIG3-RFI-CO-GE-0133 00 KAIG3-RFI-CO-GE-0133-00
KAIG3-RFI-CO-GE-0132 00 KAIG3-RFI-CO-GE-0132-00
KAIG3-RFI-CO-GE-0130 00 KAIG3-RFI-CO-GE-0130-00
KAIG3-RFI-CO-SU-0349 00 KAIG3-RFI-CO-SU-0349-00
KAIG3-RFI-CO-SU-0348 00 KAIG3-RFI-CO-SU-0348-00
KAIG3-RFI-CO-SU-0347 00 KAIG3-RFI-CO-SU-0347-00
KAIG3-RFI-CO-S-0426 00 KAIG3-RFI-CO-S-0426-00
KAIG3-RFI-CO-S-0425 00 KAIG3-RFI-CO-S-0425-00
KAIG3-RFI-CO-SU-0351 00 KAIG3-RFI-CO-SU-0351-00
KAIG3-RFI-CO-SU-0350 00 KAIG3-RFI-CO-SU-0350-00
KAIG3-RFI-TB-S-0423 00 KAIG3-RFI-TB-S-0423-00
KAIG3-RFI-TB-SU-0346 00 KAIG3-RFI-TB-SU-0346-00
KAIG3-RFI-CO-S-0422 00 KAIG3-RFI-CO-S-0422-00
KAIG3-RFI-CO-S-0421 00 KAIG3-RFI-CO-S-0421-00
KAIG3-RFI-CO-SU-0345 00 KAIG3-RFI-CO-SU-0345-00
KAIG3-RFI-TB-SU-0344 00 KAIG3-RFI-TB-SU-0344-00
KAIG3-RFI-TB-SU-0343 00 KAIG3-RFI-TB-SU-0343-00
KAIG3-RFI-TB-S-0420 00 KAIG3-RFI-TB-S-0420-00
KAIG3-RFI-TB-S-0419 00 KAIG3-RFI-TB-S-0419-00
KAIG3-RFI-CO-GE-0129 00 KAIG3-RFI-CO-GE-0129-00
KAIG3-RFI-CO-GE-0128 00 KAIG3-RFI-CO-GE-0128-00
KAIG3-RFI-CO-SU-0341 00 KAIG3-RFI-CO-SU-0341-00
KAIG3-RFI-BO-S-0418 00 KAIG3-RFI-BO-S-0418-00
KAIG3-RFI-CO-S-0417 00 KAIG3-RFI-CO-S-0417-00
KAIG3-RFI-CO-S-0416 00 KAIG3-RFI-CO-S-0416-00
KAIG3-RFI-CO-SU-0342 00 KAIG3-RFI-CO-SU-0342-00
KAIG3-RFI-BO-S-0415 00 KAIG3-RFI-BO-S-0415-00
KAIG3-RFI-BO-S-0414 00 KAIG3-RFI-BO-S-0414-00
KAIG3-RFI-PT-S-0413 00 KAIG3-RFI-PT-S-0413-00
KAIG3-RFI-GN-SU-0340 00 KAIG3-RFI-GN-SU-0340-00
KAIG3-RFI-PT-S-0412 00 KAIG3-RFI-PT-S-0412-00
KAIG3-RFI-PT-S-0411 00 KAIG3-RFI-PT-S-0411-00
KAIG3-RFI-BO-A-0162 00 KAIG3-RFI-BO-A-0162-00
KAIG3-RFI-MB-SU-0339 00 KAIG3-RFI-MB-SU-0339-00
KAIG3-RFI-CO-GE-0127 00 KAIG3-RFI-CO-GE-0127-00
KAIG3-RFI-CO-GE-0126 00 KAIG3-RFI-CO-GE-0126-00
KAIG3-RFI-CO-SU-0338 00 KAIG3-RFI-CO-SU-0338-00
KAIG3-RFI-CO-SU-0335 00 KAIG3-RFI-CO-SU-0335-00
KAIG3-RFI-CO-S-0409 00 KAIG3-RFI-CO-S-0409-00
KAIG3-RFI-CO-S-0408 00 KAIG3-RFI-CO-S-0408-00
KAIG3-RFI-CO-SU-0337 00 KAIG3-RFI-CO-SU-0337-00
KAIG3-RFI-BO-A-0163 00 KAIG3-RFI-BO-A-0163-00
KAIG3-RFI-BO-SU-0336 00 KAIG3-RFI-BO-SU-0336-00
KAIG3-RFI-TT-S-0407 00 KAIG3-RFI-TT-S-0407-00
KAIG3-RFI-CO-GE-0125 00 KAIG3-RFI-CO-GE-0125-00
KAIG3-RFI-CO-S-0406 00 KAIG3-RFI-CO-S-0406-00
KAIG3-RFI-CO-S-0405 00 KAIG3-RFI-CO-S-0405-00
KAIG3-RFI-CO-SU-0334 00 KAIG3-RFI-CO-SU-0334-00
KAIG3-RFI-CO-SU-0332 00 KAIG3-RFI-CO-SU-0332-00
KAIG3-RFI-TB-SU-0333 00 KAIG3-RFI-TB-SU-0333-00
KAIG3-RFI-CO-GE-0124 00 KAIG3-RFI-CO-GE-0124-00
KAIG3-RFI-CO-SU-0327 00 KAIG3-RFI-CO-SU-0327-00
KAIG3-RFI-TB-S-0404 00 KAIG3-RFI-TB-S-0404-00
KAIG3-RFI-PG-SU-0331 00 KAIG3-RFI-PG-SU-0331-00
KAIG3-RFI-CO-S-0403 00 KAIG3-RFI-CO-S-0403-00
KAIG3-RFI-CO-S-0402 00 KAIG3-RFI-CO-S-0402-00
KAIG3-RFI-CO-S-0401 00 KAIG3-RFI-CO-S-0401-00
KAIG3-RFI-CO-S-0400 00 KAIG3-RFI-CO-S-0400-00
KAIG3-RFI-CO-SU-0330 00 KAIG3-RFI-CO-SU-0330-00
KAIG3-RFI-CO-SU-0329 00 KAIG3-RFI-CO-SU-0329-00
KAIG3-RFI-CO-SU-0328 00 KAIG3-RFI-CO-SU-0328-00
KAIG3-RFI-TT-S-0399 00 KAIG3-RFI-TT-S-0399-00
KAIG3-RFI-FC-A-0161 00 KAIG3-RFI-FC-A-0161-00
KAIG3-RFI-PT-A-0160 00 KAIG3-RFI-PT-A-0160-00
KAIG3-RFI-TT-A-0159 00 KAIG3-RFI-TT-A-0159-00
KAIG3-RFI-CO-GE-0123 00 KAIG3-RFI-CO-GE-0123-00
KAIG3-RFI-CO-SU-0326 00 KAIG3-RFI-CO-SU-0326-00
KAIG3-RFI-MB-S-0394 00 KAIG3-RFI-MB-S-0394-00
KAIG3-RFI-MB-S-0393 00 KAIG3-RFI-MB-S-0393-00
KAIG3-RFI-CO-S-0398 00 KAIG3-RFI-CO-S-0398-00
KAIG3-RFI-CO-S-0397 00 KAIG3-RFI-CO-S-0397-00
KAIG3-RFI-CO-SU-0325 00 KAIG3-RFI-CO-SU-0325-00
KAIG3-RFI-CO-GE-0122 00 KAIG3-RFI-CO-GE-0122-00
KAIG3-RFI-CO-GE-0121 00 KAIG3-RFI-CO-GE-0121-00
KAIG3-RFI-CO-S-0396 00 KAIG3-RFI-CO-S-0396-00
KAIG3-RFI-CO-S-0395 00 KAIG3-RFI-CO-S-0395-00
KAIG3-RFI-CO-SU-0323 00 KAIG3-RFI-CO-SU-0323-00
KAIG3-RFI-CO-SU-0322 00 KAIG3-RFI-CO-SU-0322-00
KAIG3-RFI-CO-SU-0320 00 KAIG3-RFI-CO-SU-0320-00
KAIG3-RFI-TT-S-0392 00 KAIG3-RFI-TT-S-0392-00
KAIG3-RFI-MB-S-0391 00 KAIG3-RFI-MB-S-0391-00
KAIG3-RFI-MB-S-0390 00 KAIG3-RFI-MB-S-0390-00
KAIG3-RFI-TB-S-0389 00 KAIG3-RFI-TB-S-0389-00
KAIG3-RFI-BO-SU-0321 00 KAIG3-RFI-BO-SU-0321-00
KAIG3-RFI-CO-GE-0120 00 KAIG3-RFI-CO-GE-0120-00
KAIG3-RFI-CO-SU-0319 00 KAIG3-RFI-CO-SU-0319-00
KAIG3-RFI-WT-S-0386 00 KAIG3-RFI-WT-S-0386-00
KAIG3-RFI-MB-S-0385 00 KAIG3-RFI-MB-S-0385-00
KAIG3-RFI-MB-S-0384 00 KAIG3-RFI-MB-S-0384-00
KAIG3-RFI-GN-S-0383 00 KAIG3-RFI-GN-S-0383-00
KAIG3-RFI-CO-S-0388-00 00 KAIG3-RFI-CO-S-0388-00-00
KAIG3-RFI-CO-S-0387 00 KAIG3-RFI-CO-S-0387-00
KAIG3-RFI-CO-SU-0318 00 KAIG3-RFI-CO-SU-0318-00
KAIG3-RFI-WG-S-0382 00 KAIG3-RFI-WG-S-0382-00
KAIG3-RFI-BO-S-0381 00 KAIG3-RFI-BO-S-0381-00
KAIG3-RFI-CO-S-0380 00 KAIG3-RFI-CO-S-0380-00
KAIG3-RFI-CO-S-0379 00 KAIG3-RFI-CO-S-0379-00
KAIG3-RFI-CO-S-0378 00 KAIG3-RFI-CO-S-0378-00
KAIG3-RFI-CO-S-0377 00 KAIG3-RFI-CO-S-0377-00
KAIG3-RFI-CO-SU-0317 00 KAIG3-RFI-CO-SU-0317-00
KAIG3-RFI-CO-SU-0316 00 KAIG3-RFI-CO-SU-0316-00
KAIG3-RFI-CO-GE-0119 00 KAIG3-RFI-CO-GE-0119-00
KAIG3-RFI-GN-LS-0028 00 KAIG3-RFI-GN-LS-0028-00
KAIG3-RFI-GN-LS-0029 00 KAIG3-RFI-GN-LS-0029-00
KAIG3-RFI-GN-LS-0030 00 KAIG3-RFI-GN-LS-0030-00
KAIG3-RFI-GN-LS-0032 00 KAIG3-RFI-GN-LS-0032-00
KAIG3-RFI-GN-LS-0031 00 KAIG3-RFI-GN-LS-0031-00
KAIG3-RFI-CO-SU-0315 00 KAIG3-RFI-CO-SU-0315-00
KAIG3-RFI-TB-S-0322 02 KAIG3-RFI-TB-S-0322-02
KAIG3-RFI-WT-S-0376 00 KAIG3-RFI-WT-S-0376-00
KAIG3-RFI-BO-S-0375 00 KAIG3-RFI-BO-S-0375-00
KAIG3-RFI-CO-GE-0118 00 KAIG3-RFI-CO-GE-0118-00
KAIG3-RFI-CO-SU-0314 00 KAIG3-RFI-CO-SU-0314-00
KAIG3-RFI-CO-S-0367 00 KAIG3-RFI-CO-S-0367-00
KAIG3-RFI-CO-GE-0117 00 KAIG3-RFI-CO-GE-0117-00
KAIG3-RFI-CO-SU-0313 00 KAIG3-RFI-CO-SU-0313-00
KAIG3-RFI-CO-S-0374 00 KAIG3-RFI-CO-S-0374-00
KAIG3-RFI-CO-S-0373 00 KAIG3-RFI-CO-S-0373-00
KAIG3-RFI-CO-SU-0312 00 KAIG3-RFI-CO-SU-0312-00
KAIG3-RFI-BO-E-0012 00 KAIG3-RFI-BO-E-0012-00
KAIG3-RFI-BO-LC-0013 00 KAIG3-RFI-BO-LC-0013-00
KAIG3-RFI-TB-S-0322 01 KAIG3-RFI-TB-S-0322-01
KAIG3-RFI-TT-S-0372 00 KAIG3-RFI-TT-S-0372-00
KAIG3-RFI-BO-S-0364 00 KAIG3-RFI-BO-S-0364-00
KAIG3-RFI-BO-S-0363 00 KAIG3-RFI-BO-S-0363-00
KAIG3-RFI-BO-S-0362 00 KAIG3-RFI-BO-S-0362-00
KAIG3-RFI-PT-S-0371 00 KAIG3-RFI-PT-S-0371-00
KAIG3-RFI-TT-S-0370 00 KAIG3-RFI-TT-S-0370-00
KAIG3-RFI-BO-S-0369 00 KAIG3-RFI-BO-S-0369-00
KAIG3-RFI-CO-S-0368 00 KAIG3-RFI-CO-S-0368-00
KAIG3-RFI-CO-SU-0311 00 KAIG3-RFI-CO-SU-0311-00
KAIG3-RFI-BO-A-0158 00 KAIG3-RFI-BO-A-0158-00
KAIG3-RFI-CO-GE-0116 00 KAIG3-RFI-CO-GE-0116-00
KAIG3-RFI-CO-GE-0115 00 KAIG3-RFI-CO-GE-0115-00
KAIG3-RFI-CO-GE-0114 00 KAIG3-RFI-CO-GE-0114-00
KAIG3-RFI-CO-GE-0113 00 KAIG3-RFI-CO-GE-0113-00
KAIG3-RFI-PT-S-0366 00 KAIG3-RFI-PT-S-0366-00
KAIG3-RFI-PT-S-0365 00 KAIG3-RFI-PT-S-0365-00
KAIG3-RFI-PT-A-0157 00 KAIG3-RFI-PT-A-0157-00
KAIG3-RFI-BO-LC-0012 00 KAIG3-RFI-BO-LC-0012-00
KAIG3-RFI-BO-E-0011 00 KAIG3-RFI-BO-E-0011-00
KAIG3-RFI-CO-SU-0310 00 KAIG3-RFI-CO-SU-0310-00
KAIG3-RFI-MB-S-0361 00 KAIG3-RFI-MB-S-0361-00
KAIG3-RFI-CO-S-0359 00 KAIG3-RFI-CO-S-0359-00
KAIG3-RFI-CO-SU-0309 00 KAIG3-RFI-CO-SU-0309-00
KAIG3-RFI-CO-S-0358 00 KAIG3-RFI-CO-S-0358-00
KAIG3-RFI-CO-S-0357 00 KAIG3-RFI-CO-S-0357-00
KAIG3-RFI-CO-SU-0308 00 KAIG3-RFI-CO-SU-0308-00
KAIG3-RFI-TB-S-0350 00 KAIG3-RFI-TB-S-0350-00
KAIG3-RFI-MB-S-0355 00 KAIG3-RFI-MB-S-0355-00
KAIG3-RFI-TT-S-0354 00 KAIG3-RFI-TT-S-0354-00
KAIG3-RFI-BO-S-0353 00 KAIG3-RFI-BO-S-0353-00
KAIG3-RFI-BO-S-0352 00 KAIG3-RFI-BO-S-0352-00
KAIG3-RFI-BO-S-0351 00 KAIG3-RFI-BO-S-0351-00
KAIG3-RFI-CO-GE-0112 00 KAIG3-RFI-CO-GE-0112-00
KAIG3-RFI-PT-P-0004 00 KAIG3-RFI-PT-P-0004-00
KAIG3-RFI-CO-GE-0111 00 KAIG3-RFI-CO-GE-0111-00
KAIG3-RFI-CO-SU-0306 00 KAIG3-RFI-CO-SU-0306-00
KAIG3-RFI-CO-GE-0110 00 KAIG3-RFI-CO-GE-0110-00
KAIG3-RFI-CO-GE-0109 00 KAIG3-RFI-CO-GE-0109-00
KAIG3-RFI-CO-GE-0108 00 KAIG3-RFI-CO-GE-0108-00
KAIG3-RFI-CO-SU-0305 00 KAIG3-RFI-CO-SU-0305-00
KAIG3-RFI-CO-GE-0107 00 KAIG3-RFI-CO-GE-0107-00
KAIG3-RFI-BO-A-0155 01 KAIG3-RFI-BO-A-0155-01
KAIG3-RFI-MB-S-0349 00 KAIG3-RFI-MB-S-0349-00
KAIG3-RFI-TT-S-0348 00 KAIG3-RFI-TT-S-0348-00
KAIG3-RFI-PT-S-0347 00 KAIG3-RFI-PT-S-0347-00
KAIG3-RFI-TB-P-0003 00 KAIG3-RFI-TB-P-0003-00
KAIG3-RFI-CO-S-0346 00 KAIG3-RFI-CO-S-0346-00
KAIG3-RFI-CO-S-0345 00 KAIG3-RFI-CO-S-0345-00
KAIG3-RFI-CO-SU-0304 00 KAIG3-RFI-CO-SU-0304-00
KAIG3-RFI-CO-GE-0106 00 KAIG3-RFI-CO-GE-0106-00
KAIG3-RFI-CO-GE-0105 00 KAIG3-RFI-CO-GE-0105-00
KAIG3-RFI-CO-SU-0302 00 KAIG3-RFI-CO-SU-0302-00
KAIG3-RFI-CO-SU-0301 00 KAIG3-RFI-CO-SU-0301-00
KAIG3-RFI-TB-S-0342 00 KAIG3-RFI-TB-S-0342-00
KAIG3-RFI-CO-GE-0104 00 KAIG3-RFI-CO-GE-0104-00
KAIK3-RFI-CO-GE-0103 00 KAIK3-RFI-CO-GE-0103-00
KAIG3-RFI-CO-SU-0300 00 KAIG3-RFI-CO-SU-0300-00
KAIG3-RFI-CO-S-0344 00 KAIG3-RFI-CO-S-0344-00
KAIG3-RFI-CO-S-0343 00 KAIG3-RFI-CO-S-0343-00
KAIG3-RFI-CO-SU-0303 00 KAIG3-RFI-CO-SU-0303-00
KAIG3-RFI-TB-LC-0011 00 KAIG3-RFI-TB-LC-0011-00
KAIG3-RFI-TB-E-0010 00 KAIG3-RFI-TB-E-0010-00
KAIG3-RFI-CO-GE-0102 00 KAIG3-RFI-CO-GE-0102-00
KAIG3-RFI-CO-SU-0298 00 KAIG3-RFI-CO-SU-0298-00
KAIG3-RFI-CO-GE-0101 00 KAIG3-RFI-CO-GE-0101-00
KAIG3-RFI-CO-GE-0100 00 KAIG3-RFI-CO-GE-0100-00
KAIG3-RFI-CO-GE-0099 00 KAIG3-RFI-CO-GE-0099-00
KAIG3-RFI-CO-SU-0297 00 KAIG3-RFI-CO-SU-0297-00
KAIG3-RFI-CO-SU-0296 00 KAIG3-RFI-CO-SU-0296-00
KAIG3-RFI-TB-S-0336 00 KAIG3-RFI-TB-S-0336-00
KAIG3-RFI-CO-S-0340 00 KAIG3-RFI-CO-S-0340-00
KAIG3-RFI-FC-S-0341 00 KAIG3-RFI-FC-S-0341-00
KAIG3-RFI-CO-GE-0098 00 KAIG3-RFI-CO-GE-0098-00
KAIG3-RFI-CO-GE-0097 00 KAIG3-RFI-CO-GE-0097-00
KAIG3-RFI-CO-GE-0096 00 KAIG3-RFI-CO-GE-0096-00
KAIG3-RFI-CO-GE-0095 00 KAIG3-RFI-CO-GE-0095-00
KAIG3-RFI-CO-GE-0094 00 KAIG3-RFI-CO-GE-0094-00
KAIG3-RFI-CO-S-0339 00 KAIG3-RFI-CO-S-0339-00
KAIG3-RFI-CO-SU-0299 00 KAIG3-RFI-CO-SU-0299-00
KAIG3-RFI-CO-SU-0295 00 KAIG3-RFI-CO-SU-0295-00
KAIG3-RFI-CO-GE-0093 00 KAIG3-RFI-CO-GE-0093-00
KAIG3-RFI-CO-GE-0092 00 KAIG3-RFI-CO-GE-0092-00
KAIG3-RFI-CO-GE-0091 00 KAIG3-RFI-CO-GE-0091-00
KAIG3-RFI-CO-S-0338 00 KAIG3-RFI-CO-S-0338-00
KAIG3-RFI-CO-S-0337 00 KAIG3-RFI-CO-S-0337-00
KAIG3-RFI-CO-SU-0294 00 KAIG3-RFI-CO-SU-0294-00
KAIG3-RFI-CO-SU-0293 00 KAIG3-RFI-CO-SU-0293-00
KAIG3-RFI-CO-SU-0292 00 KAIG3-RFI-CO-SU-0292-00
KAIG3-RFI-CO-SU-0291 00 KAIG3-RFI-CO-SU-0291-00
KAIG3-RFI-CO-GE-0090 00 KAIG3-RFI-CO-GE-0090-00
KAIG3-RFI-CO-GE-0089 00 KAIG3-RFI-CO-GE-0089-00
KAIG3-RFI-CO-SU-0290 00 KAIG3-RFI-CO-SU-0290-00
KAIG3-RFI-CO-SU-0289 00 KAIG3-RFI-CO-SU-0289-00
KAIG3-RFI-BO-A-0156 00 KAIG3-RFI-BO-A-0156-00
KAIG3-RFI-TB-SU-0249 00 KAIG3-RFI-TB-SU-0249-00
KAIG3-RFI-CO-S-0334 00 KAIG3-RFI-CO-S-0334-00
KAIG3-RFI-CO-S-0333 00 KAIG3-RFI-CO-S-0333-00
KAIG3-RFI-CO-SU-0288 00 KAIG3-RFI-CO-SU-0288-00
KAIG3-RFI-CO-SU-0287 00 KAIG3-RFI-CO-SU-0287-00
KAIG3-RFI-MB-S-0335 00 KAIG3-RFI-MB-S-0335-00
KAIG3-RFI-BO-A-0144-02 00 KAIG3-RFI-BO-A-0144-02-00
KAIG3-RFI-BO-S-0332 00 KAIG3-RFI-BO-S-0332-00
KAIG3-RFI-BO-S-0331 00 KAIG3-RFI-BO-S-0331-00
KAIG3-RFI-BO-S-0330 00 KAIG3-RFI-BO-S-0330-00
KAIG3-RFI-CO-GE-0088 00 KAIG3-RFI-CO-GE-0088-00
KAIG3-RFI-CO-GE-0087 00 KAIG3-RFI-CO-GE-0087-00
KAIG3-RFI-CO-GE-0086 00 KAIG3-RFI-CO-GE-0086-00
KAIG3-RFI-CO-SU-0286 00 KAIG3-RFI-CO-SU-0286-00
KAIG3-RFI-CO-SU-0285 00 KAIG3-RFI-CO-SU-0285-00
KAIG3-RFI-CO-SU-0284 00 KAIG3-RFI-CO-SU-0284-00
KAIG3-RFI-PT-P-0002 00 KAIG3-RFI-PT-P-0002-00
KAIG3-RFI-MB-S-0328 00 KAIG3-RFI-MB-S-0328-00
KAIG3-RFI-BO-S-0327 00 KAIG3-RFI-BO-S-0327-00
KAIG3-RFI-CO-GE-0085 00 KAIG3-RFI-CO-GE-0085-00
KAIG3-RFI-CO-GE-0084 00 KAIG3-RFI-CO-GE-0084-00
KAIG3-RFI-CO-GE-0083 00 KAIG3-RFI-CO-GE-0083-00
KAIG3-RFI-CO-GE-0082 00 KAIG3-RFI-CO-GE-0082-00
KAIG3-RFI-CO-GE-0081 00 KAIG3-RFI-CO-GE-0081-00
KAIG3-RFI-GN-LS-0027 00 KAIG3-RFI-GN-LS-0027-00
KAIG3-RFI-GN-LS-0026 00 KAIG3-RFI-GN-LS-0026-00
KAIG3-RFI-GN-LS-0025 00 KAIG3-RFI-GN-LS-0025-00
KAIG3-RFI-GN-LS-0024 00 KAIG3-RFI-GN-LS-0024-00
KAIG3-RFI-GN-LS-0023 00 KAIG3-RFI-GN-LS-0023-00
KAIG3-RFI-CO-GE-0080 00 KAIG3-RFI-CO-GE-0080-00
KAIG3-RFI-CO-GE-0079 00 KAIG3-RFI-CO-GE-0079-00
KAIG3-RFI-CO-SU-0283 00 KAIG3-RFI-CO-SU-0283-00
KAIG3-RFI-CO-SU-0282 00 KAIG3-RFI-CO-SU-0282-00
KAIG3-RFI-GN-S-0326 00 KAIG3-RFI-GN-S-0326-00
KAIG3-RFI-BO-A-0148 01 KAIG3-RFI-BO-A-0148-01
KAIG3-RFI-BO-A-0155 00 KAIG3-RFI-BO-A-0155-00
KAIG3-RFI-BO-A-0152 00 KAIG3-RFI-BO-A-0152-00
KAIG3-RFI-RD-SU-0281 00 KAIG3-RFI-RD-SU-0281-00
KAIG3-RFI-CO-GE-0078 00 KAIG3-RFI-CO-GE-0078-00
KAIG3-RFI-CO-GE-0077 00 KAIG3-RFI-CO-GE-0077-00
KAIG3-RFI-CO-GE-0076 00 KAIG3-RFI-CO-GE-0076-00
KAIG3-RFI-CO-SU-0280 00 KAIG3-RFI-CO-SU-0280-00
KAIG3-RFI-CO-SU-0279 00 KAIG3-RFI-CO-SU-0279-00
KAIG3-RFI-CO-SU-0278 00 KAIG3-RFI-CO-SU-0278-00
KAIG3-RFI-MB-S-0325 00 KAIG3-RFI-MB-S-0325-00
KAIG3-RFI-CO-GE-0075 00 KAIG3-RFI-CO-GE-0075-00
KAIG3-RFI-CO-GE-0072 00 KAIG3-RFI-CO-GE-0072-00
KAIG3-RFI-CO-SU-0277 00 KAIG3-RFI-CO-SU-0277-00
KAIG3-RFI-CO-SU-0273 00 KAIG3-RFI-CO-SU-0273-00
KAIG3-RFI-BO-LC-0001 01 KAIG3-RFI-BO-LC-0001-01
KAIG3-RFI-MB-S-0306 01 KAIG3-RFI-MB-S-0306-01
KAIG3-RFI-CO-GE-0074 00 KAIG3-RFI-CO-GE-0074-00
KAIG3-RFI-CO-GE-0073 00 KAIG3-RFI-CO-GE-0073-00
KAIG3-RFI-CO-S-0324 00 KAIG3-RFI-CO-S-0324-00
KAIG3-RFI-CO-S-0323 00 KAIG3-RFI-CO-S-0323-00
KAIG3-RFI-CO-SU-0276 00 KAIG3-RFI-CO-SU-0276-00
KAIG3-RFI-CO-SU-0275 00 KAIG3-RFI-CO-SU-0275-00
KAIG3-RFI-CO-SU-0274 00 KAIG3-RFI-CO-SU-0274-00
KAIG3-RFI-TB-S-0322 00 KAIG3-RFI-TB-S-0322-00
KAIG3-RFI-TB-S-0321 00 KAIG3-RFI-TB-S-0321-00
KAIG3-RFI-PT-A-0154 00 KAIG3-RFI-PT-A-0154-00
KAIG3-RFI-CO-GE-0035 00 KAIG3-RFI-CO-GE-0035-00
KAIG3-RFI-CO-GE-0071 00 KAIG3-RFI-CO-GE-0071-00
KAIG3-RFI-CO-GE-0070 00 KAIG3-RFI-CO-GE-0070-00
KAIG3-RFI-CO-GE-0069 00 KAIG3-RFI-CO-GE-0069-00
KAIG3-RFI-CO-GE-0068 00 KAIG3-RFI-CO-GE-0068-00
KAIG3-RFI-CO-GE-0067 00 KAIG3-RFI-CO-GE-0067-00
KAIG3-RFI-CO-S-0319 00 KAIG3-RFI-CO-S-0319-00
KAIG3-RFI-CO-S-0318 00 KAIG3-RFI-CO-S-0318-00
KAIG3-RFI-CO-S-0317 00 KAIG3-RFI-CO-S-0317-00
KAIG3-RFI-CO-SU-0272 00 KAIG3-RFI-CO-SU-0272-00
KAIG3-RFI-CO-SU-0271 00 KAIG3-RFI-CO-SU-0271-00
KAIG3-RFI-CO-SU-0270 00 KAIG3-RFI-CO-SU-0270-00
KAIG3-RFI-CO-SU-0269 00 KAIG3-RFI-CO-SU-0269-00
KAIG3-RFI-CO-SU-0268 00 KAIG3-RFI-CO-SU-0268-00
KAIG3-RFI-CO-SU-0267 00 KAIG3-RFI-CO-SU-0267-00
KAIG3-RFI-FC-S-0320 00 KAIG3-RFI-FC-S-0320-00
KAIG3-RFI-PT-A-0153 00 KAIG3-RFI-PT-A-0153-00
KAIG3-RFI-RD-SU-0244 00 KAIG3-RFI-RD-SU-0244-00
KAIG3-RFI-PT-S-0294 00 KAIG3-RFI-PT-S-0294-00
KAIG3-RFI-CO-GE-0066 00 KAIG3-RFI-CO-GE-0066-00
KAIG3-RFI-CO-GE-0065 00 KAIG3-RFI-CO-GE-0065-00
KAIG3-RFI-CO-GE-0064 00 KAIG3-RFI-CO-GE-0064-00
KAIG3-RFI-CO-SU-0266 00 KAIG3-RFI-CO-SU-0266-00
KAIG3-RFI-CO-SU-0265 00 KAIG3-RFI-CO-SU-0265-00
KAIG3-RFI-TB-S-0316 00 KAIG3-RFI-TB-S-0316-00
KAIG3-RFI-CO-GE-0063 00 KAIG3-RFI-CO-GE-0063-00
KAIG3-RFI-CO-GE-0062 00 KAIG3-RFI-CO-GE-0062-00
KAIG3-RFI-CO-SU-0264 00 KAIG3-RFI-CO-SU-0264-00
KAIG3-RFI-CO-SU-0263 00 KAIG3-RFI-CO-SU-0263-00
KAIG3-RFI-CO-GE-0061 00 KAIG3-RFI-CO-GE-0061-00
KAIG3-RFI-CO-GE-0060 00 KAIG3-RFI-CO-GE-0060-00
KAIG3-RFI-CO-GE-0059 00 KAIG3-RFI-CO-GE-0059-00
KAIG3-RFI-CO-GE-0058 00 KAIG3-RFI-CO-GE-0058-00
KAIG3-RFI-CO-SU-0262 00 KAIG3-RFI-CO-SU-0262-00
KAIG3-RFI-CO-SU-0261 00 KAIG3-RFI-CO-SU-0261-00
KAIG3-RFI-CO-SU-0260 00 KAIG3-RFI-CO-SU-0260-00
KAIG3-RFI-CO-SU-0259 00 KAIG3-RFI-CO-SU-0259-00
KAIG3-RFI-BO-A-0149 01 KAIG3-RFI-BO-A-0149-01
KAIG3-RFI-CO-GE-0057 00 KAIG3-RFI-CO-GE-0057-00
KAIG3-RFI-CO-SU-0258 00 KAIG3-RFI-CO-SU-0258-00
KAIG3-RFI-TT-S-0291 00 KAIG3-RFI-TT-S-0291-00
KAIG3-RFI-CO-GE-0056 00 KAIG3-RFI-CO-GE-0056-00
KAIG3-RFI-CO-GE-0055 00 KAIG3-RFI-CO-GE-0055-00
KAIG3-RFI-CO-SU-0257 00 KAIG3-RFI-CO-SU-0257-00
KAIG3-RFI-CO-SU-0256 00 KAIG3-RFI-CO-SU-0256-00
KAIG3-RFI-CO-S-0315 00 KAIG3-RFI-CO-S-0315-00
KAIG3-RFI-CO-GE-0054 00 KAIG3-RFI-CO-GE-0054-00
KAIG3-RFI-CO-SU-0255 00 KAIG3-RFI-CO-SU-0255-00
KAIG3-RFI-BO-S-0305 00 KAIG3-RFI-BO-S-0305-00
KAIG3-RFI-BO-S-0282 00 KAIG3-RFI-BO-S-0282-00
KAIG3-RFI-BO-S-0281 00 KAIG3-RFI-BO-S-0281-00
KAIG3-RFI-PT-S-0314 00 KAIG3-RFI-PT-S-0314-00
KAIG3-RFI-GN-LS-0022 00 KAIG3-RFI-GN-LS-0022-00
KAIG3-RFI-GN-LS-0021 00 KAIG3-RFI-GN-LS-0021-00
KAIG3-RFI-GN-LS-0020 00 KAIG3-RFI-GN-LS-0020-00
KAIG3-RFI-GN-LS-0019 00 KAIG3-RFI-GN-LS-0019-00
KAIG3-RFI-GN-LS-0018 00 KAIG3-RFI-GN-LS-0018-00
KAIG3-RFI-GN-LS-0017 00 KAIG3-RFI-GN-LS-0017-00
KAIG3-RFI-GN-LS-0016 00 KAIG3-RFI-GN-LS-0016-00
KAIG3-RFI-GN-LS-0015 00 KAIG3-RFI-GN-LS-0015-00
KAIG3-RFI-GN-LS-0014 00 KAIG3-RFI-GN-LS-0014-00
KAIG3-RFI-GN-LS-0013 00 KAIG3-RFI-GN-LS-0013-00
KAIG3-RFI-BO-A-0143 01 KAIG3-RFI-BO-A-0143-01
KAIG3-RFI-CO-GE-0053 00 KAIG3-RFI-CO-GE-0053-00
KAIG3-RFI-CO-GE-0052 00 KAIG3-RFI-CO-GE-0052-00
KAIG3-RFI-CO-SU-0254 00 KAIG3-RFI-CO-SU-0254-00
KAIG3-RFI-CO-SU-0253 00 KAIG3-RFI-CO-SU-0253-00
KAIG3-RFI-FC-S-0313 00 KAIG3-RFI-FC-S-0313-00
KAIG3-RFI-CO-S-0312 00 KAIG3-RFI-CO-S-0312-00
KAIG3-RFI-CO-S-0311 00 KAIG3-RFI-CO-S-0311-00
KAIG3-RFI-CO-SU-0252 00 KAIG3-RFI-CO-SU-0252-00
KAIG3-RFI-CO-GE-0051 00 KAIG3-RFI-CO-GE-0051-00
KAIG3-RFI-CO-GE-0050 00 KAIG3-RFI-CO-GE-0050-00
KAIG3-RFI-CO-GE-0049 00 KAIG3-RFI-CO-GE-0049-00
KAIG3-RFI-CO-GE-0048 00 KAIG3-RFI-CO-GE-0048-00
KAIG3-RFI-CO-S-0310 00 KAIG3-RFI-CO-S-0310-00
KAIG3-RFI-CO-S-0309 00 KAIG3-RFI-CO-S-0309-00
KAIG3-RFI-CO-SU-0251 00 KAIG3-RFI-CO-SU-0251-00
KAIG3-RFI-CO-SU-0250 00 KAIG3-RFI-CO-SU-0250-00
KAIG3-RFI-CO-SU-0248 00 KAIG3-RFI-CO-SU-0248-00
KAIG3-RFI-TB-S-0307 00 KAIG3-RFI-TB-S-0307-00
KAIG3-RFI-MB-S-0306 00 KAIG3-RFI-MB-S-0306-00
KAIG3-RFI-CO-GE-0047 00 KAIG3-RFI-CO-GE-0047-00
KAIG3-RFI-CO-GE-0046 00 KAIG3-RFI-CO-GE-0046-00
KAIG3-RFI-CO-SU-0247 00 KAIG3-RFI-CO-SU-0247-00
KAIG3-RFI-CO-SU-0246 00 KAIG3-RFI-CO-SU-0246-00
KAIG3-RFI-BO-S-0304 00 KAIG3-RFI-BO-S-0304-00
KAIG3-RFI-CO-GE-0045 00 KAIG3-RFI-CO-GE-0045-00
KAIG3-RFI-CO-SU-0245 00 KAIG3-RFI-CO-SU-0245-00
KAIG3-RFI-MB-S-0303 00 KAIG3-RFI-MB-S-0303-00
KAIG3-RFI-MB-S-0302 00 KAIG3-RFI-MB-S-0302-00
KAIG3-RFI-TB-S-0301 00 KAIG3-RFI-TB-S-0301-00
KAIG3-RFI-BO-S-0300 00 KAIG3-RFI-BO-S-0300-00
KAIG3-RFI-BO-S-0299 00 KAIG3-RFI-BO-S-0299-00
KAIG3-RFI-CO-GE-0044 00 KAIG3-RFI-CO-GE-0044-00
KAIG3-RFI-CO-GE-0043 00 KAIG3-RFI-CO-GE-0043-00
KAIG3-RFI-CO-GE-0042 00 KAIG3-RFI-CO-GE-0042-00
KAIG3-RFI-CO-GE-0041 00 KAIG3-RFI-CO-GE-0041-00
KAIG3-RFI-CO-GE-0040 00 KAIG3-RFI-CO-GE-0040-00
KAIG3-RFI-CO-GE-0039 00 KAIG3-RFI-CO-GE-0039-00
KAIG3-RFI-CO-SU-0243 00 KAIG3-RFI-CO-SU-0243-00
KAIG3-RFI-CO-SU-0242 00 KAIG3-RFI-CO-SU-0242-00
KAIG3-RFI-FC-S-0298 00 KAIG3-RFI-FC-S-0298-00
KAIG3-RFI-CO-GE-0038 00 KAIG3-RFI-CO-GE-0038-00
KAIG3-RFI-CO-GE-0037 00 KAIG3-RFI-CO-GE-0037-00
KAIG3-RFI-CO-GE-0036 00 KAIG3-RFI-CO-GE-0036-00
KAIG3-RFI-CO-GE-0034 00 KAIG3-RFI-CO-GE-0034-00
KAIG3-RFI-CO-GE-0033 00 KAIG3-RFI-CO-GE-0033-00
KAIG3-RFI-CO-SU-0241 00 KAIG3-RFI-CO-SU-0241-00
KAIG3-RFI-CO-SU-0240 00 KAIG3-RFI-CO-SU-0240-00
KAIG3-RFI-MB-C-0018 00 KAIG3-RFI-MB-C-0018-00
KAIG3-RFI-BO-S-0297 00 KAIG3-RFI-BO-S-0297-00
KAIG3-RFI-BO-S-0296 00 KAIG3-RFI-BO-S-0296-00
KAIG3-RFI-BO-S-0295 00 KAIG3-RFI-BO-S-0295-00
KAIG3-RFI-CO-GE-0032 00 KAIG3-RFI-CO-GE-0032-00
KAIG3-RFI-CO-GE-0031 00 KAIG3-RFI-CO-GE-0031-00
KAIG3-RFI-CO-GE-0030 00 KAIG3-RFI-CO-GE-0030-00
KAIG3-RFI-CO-GE-0029 00 KAIG3-RFI-CO-GE-0029-00
KAIG3-RFI-CO-GE-0028 00 KAIG3-RFI-CO-GE-0028-00
KAIG3-RFI-CO-GE-0027 00 KAIG3-RFI-CO-GE-0027-00
KAIG3-RFI-CO-GE-0026 00 KAIG3-RFI-CO-GE-0026-00
KAIG3-RFI-CO-GE-0025 00 KAIG3-RFI-CO-GE-0025-00
KAIG3-RFI-CO-GE-0024 00 KAIG3-RFI-CO-GE-0024-00
KAIG3-RFI-CO-GE-0023 00 KAIG3-RFI-CO-GE-0023-00
KAIG3-RFI-CO-SU-0239 00 KAIG3-RFI-CO-SU-0239-00
KAIG3-RFI-CO-SU-0238 00 KAIG3-RFI-CO-SU-0238-00
KAIG3-RFI-GN-LS-0003 01 KAIG3-RFI-GN-LS-0003-01
KAIG3-RFI-CO-S-0293 00 KAIG3-RFI-CO-S-0293-00
KAIG3-RFI-CO-S-0292 00 KAIG3-RFI-CO-S-0292-00
KAIG3-RFI-CO-SU-0234 00 KAIG3-RFI-CO-SU-0234-00
KAIG3-RFI-CO-GE-0022 00 KAIG3-RFI-CO-GE-0022-00
KAIG3-RFI-CO-GE-0021 00 KAIG3-RFI-CO-GE-0021-00
KAIG3-RFI-CO-SU-0237 00 KAIG3-RFI-CO-SU-0237-00
KAIG3-RFI-CO-SU-0236 00 KAIG3-RFI-CO-SU-0236-00
KAIG3-RFI-CO-SU-0235 00 KAIG3-RFI-CO-SU-0235-00
KAIG3-RFI-PT-LC-0010 00 KAIG3-RFI-PT-LC-0010-00
KAIG3-RFI-PT-LC-0009 00 KAIG3-RFI-PT-LC-0009-00
KAIG3-RFI-TT-LC-0008 00 KAIG3-RFI-TT-LC-0008-00
KAIG3-RFI-TT-LC-0007 00 KAIG3-RFI-TT-LC-0007-00
KAIG3-RFI-PT-E-0009 00 KAIG3-RFI-PT-E-0009-00
KAIG3-RFI-PT-E-0008 00 KAIG3-RFI-PT-E-0008-00
KAIG3-RFI-PT-E-0007 00 KAIG3-RFI-PT-E-0007-00
KAIG3-RFI-PT-E-0006 00 KAIG3-RFI-PT-E-0006-00
KAIG3-RFI-TT-E-0005 00 KAIG3-RFI-TT-E-0005-00
KAIG3-RFI-TT-E-0004 00 KAIG3-RFI-TT-E-0004-00
KAIG3-RFI-TT-E-0003 00 KAIG3-RFI-TT-E-0003-00
KAIG3-RFI-TT-E-0002 00 KAIG3-RFI-TT-E-0002-00
KAIG3-RFI-BO-S-0290 00 KAIG3-RFI-BO-S-0290-00
KAIG3-RFI-BO-S-0289 00 KAIG3-RFI-BO-S-0289-00
KAIG3-RFI-CO-GE-0020 00 KAIG3-RFI-CO-GE-0020-00
KAIG3-RFI-CO-SU-0233 00 KAIG3-RFI-CO-SU-0233-00
KAIG3-RFI-FC-A-0150 00 KAIG3-RFI-FC-A-0150-00
KAIG3-RFI-FC-A-0151 00 KAIG3-RFI-FC-A-0151-00
KAIG3-RFI-PT-S-0288 00 KAIG3-RFI-PT-S-0288-00
KAIG3-RFI-CO-GE-0019 00 KAIG3-RFI-CO-GE-0019-00
KAIG3-RFI-CO-GE-0018 00 KAIG3-RFI-CO-GE-0018-00
KAIG3-RFI-CO-SU-0232 00 KAIG3-RFI-CO-SU-0232-00
KAIG3-RFI-CO-GE-0017 00 KAIG3-RFI-CO-GE-0017-00
KAIG3-RFI-CO-GE-0016 00 KAIG3-RFI-CO-GE-0016-00
KAIG3-RFI-CO-GE-0015 00 KAIG3-RFI-CO-GE-0015-00
KAIG3-RFI-CO-GE-0014 00 KAIG3-RFI-CO-GE-0014-00
KAIG3-RFI-CO-GE-0013 00 KAIG3-RFI-CO-GE-0013-00
KAIG3-RFI-CO-GE-0012 00 KAIG3-RFI-CO-GE-0012-00
KAIG3-RFI-CO-SU-0231 00 KAIG3-RFI-CO-SU-0231-00
KAIG3-RFI-GN-LS-0012 00 KAIG3-RFI-GN-LS-0012-00
KAIG3-RFI-GN-LS-0011 00 KAIG3-RFI-GN-LS-0011-00
KAIG3-RFI-GN-LS-0010 00 KAIG3-RFI-GN-LS-0010-00
KAIG3-RFI-GN-LS-0009 00 KAIG3-RFI-GN-LS-0009-00
KAIG3-RFI-GN-LS-0008 00 KAIG3-RFI-GN-LS-0008-00
KAIG3-RFI-GN-LS-0007 00 KAIG3-RFI-GN-LS-0007-00
KAIG3-RFI-GN-LS-0006 00 KAIG3-RFI-GN-LS-0006-00
KAIG3-RFI-GN-LS-0005 00 KAIG3-RFI-GN-LS-0005-00
KAIG3-RFI-GN-LS-0004 00 KAIG3-RFI-GN-LS-0004-00
KAIG3-RFI-BO-S-0287 00 KAIG3-RFI-BO-S-0287-00
KAIG3-RFI-BO-S-0286 00 KAIG3-RFI-BO-S-0286-00
KAIG3-RFI-MB-S-0285 00 KAIG3-RFI-MB-S-0285-00
KAIG3-RFI-FC-S-0284 00 KAIG3-RFI-FC-S-0284-00
KAIG3-RFI-CO-GE-0011 00 KAIG3-RFI-CO-GE-0011-00
KAIG3-RFI-CO-SU-0230 00 KAIG3-RFI-CO-SU-0230-00
KAIG3-RFI-CO-GE-0010 00 KAIG3-RFI-CO-GE-0010-00
KAIG3-RFI-CO-GE-0009 00 KAIG3-RFI-CO-GE-0009-00
KAIG3-RFI-CO-GE-0008 00 KAIG3-RFI-CO-GE-0008-00
KAIG3-RFI-CO-GE-0007 00 KAIG3-RFI-CO-GE-0007-00
KAIG3-RFI-CO-GE-0006 00 KAIG3-RFI-CO-GE-0006-00
KAIG3-RFI-CO-GE-0005 00 KAIG3-RFI-CO-GE-0005-00
KAIG3-RFI-CO-SU-0229 00 KAIG3-RFI-CO-SU-0229-00
KAIG3-RFI-CO-SU-0228 00 KAIG3-RFI-CO-SU-0228-00
KAIG3-RFI-CO-SU-0227 00 KAIG3-RFI-CO-SU-0227-00
KAIG3-RFI-CO-SU-0226 00 KAIG3-RFI-CO-SU-0226-00
KAIG3-RFI-BO-A-0149 00 KAIG3-RFI-BO-A-0149-00
KAIG3-RFI-CO-SU-0225 00 KAIG3-RFI-CO-SU-0225-00
KAIG3-RFI-CO-SU-0224 00 KAIG3-RFI-CO-SU-0224-00
KAIG3-RFI-CO-SU-0223 00 KAIG3-RFI-CO-SU-0223-00
KAIG3-RFI-TB-S-0260 01 KAIG3-RFI-TB-S-0260-01
KAIG3-RFI-BO-S-0256 01 KAIG3-RFI-BO-S-0256-01
KAIG3-RFI-TB-SU-0222 00 KAIG3-RFI-TB-SU-0222-00
KAIG3-RFI-BO-S-0283 00 KAIG3-RFI-BO-S-0283-00
KAIG3-RFI-BO-A-0148 00 KAIG3-RFI-BO-A-0148-00
KAIG3-RFI-BO-A-0144-01 00 KAIG3-RFI-BO-A-0144-01-00
KAIG3-RFI-CO-GE-0004 00 KAIG3-RFI-CO-GE-0004-00
KAIG3-RFI-CO-GE-0003 00 KAIG3-RFI-CO-GE-0003-00
KAIG3-RFI-CO-SU-0221 00 KAIG3-RFI-CO-SU-0221-00
KAIG3-RFI-CO-SU-0220 00 KAIG3-RFI-CO-SU-0220-00
KAIG3-RFI-CO-GE-0002 00 KAIG3-RFI-CO-GE-0002-00
KAIG3-RFI-CO-GE-0001 00 KAIG3-RFI-CO-GE-0001-00
KAIG3-RFI-CO-SU-0219 00 KAIG3-RFI-CO-SU-0219-00
KAIG3-RFI-TT-S-0280 00 KAIG3-RFI-TT-S-0280-00
KAIG3-RFI-TT-S-0279 00 KAIG3-RFI-TT-S-0279-00
KAIG3-RFI-PT-A-0147 00 KAIG3-RFI-PT-A-0147-00
KAIG3-RFI-PT-A-0145 00 KAIG3-RFI-PT-A-0145-00
KAIG3-RFI-GN-LS-0003 00 KAIG3-RFI-GN-LS-0003-00
KAIG3-RFI-CO-S-0278 00 KAIG3-RFI-CO-S-0278-00
KAIG3-RFI-CO-S-0276 00 KAIG3-RFI-CO-S-0276-00
KAIG3-RFI-CO-S-0275 00 KAIG3-RFI-CO-S-0275-00
KAIG3-RFI-CO-S-0274 00 KAIG3-RFI-CO-S-0274-00
KAIG3-RFI-CO-S-0273 00 KAIG3-RFI-CO-S-0273-00
KAIG3-RFI-CO-S-0271 00 KAIG3-RFI-CO-S-0271-00
KAIG3-RFI-CO-S-0270 00 KAIG3-RFI-CO-S-0270-00
KAIG3-RFI-CO-SU-0218 00 KAIG3-RFI-CO-SU-0218-00
KAIG3-RFI-CO-SU-0217 00 KAIG3-RFI-CO-SU-0217-00
KAIG3-RFI-TB-LC-0006 00 KAIG3-RFI-TB-LC-0006-00
KAIG3-RFI-TB-LC-0005 00 KAIG3-RFI-TB-LC-0005-00
KAIG3-RFI-TB-LC-0004 00 KAIG3-RFI-TB-LC-0004-00
KAIG3-RFI-TB-LC-0003 00 KAIG3-RFI-TB-LC-0003-00
KAIG3-RFI-TB-E-0001 00 KAIG3-RFI-TB-E-0001-00
KAIG3-RFI-CO-S-0269 00 KAIG3-RFI-CO-S-0269-00
KAIG3-RFI-CO-S-0268 00 KAIG3-RFI-CO-S-0268-00
KAIG3-RFI-CO-SU-0216 00 KAIG3-RFI-CO-SU-0216-00
KAIG3-RFI-CO-SU-0215 00 KAIG3-RFI-CO-SU-0215-00
KAIG3-RFI-PT-S-0265 00 KAIG3-RFI-PT-S-0265-00
KAIG3-RFI-PT-S-0264 00 KAIG3-RFI-PT-S-0264-00
KAIG3-RFI-PT-S-0267 00 KAIG3-RFI-PT-S-0267-00
KAIG3-RFI-PT-S-0266 00 KAIG3-RFI-PT-S-0266-00
KAIG3-RFI-BO-A-0146 00 KAIG3-RFI-BO-A-0146-00
KAIG3-RFI-CO-S-0263 00 KAIG3-RFI-CO-S-0263-00
KAIG3-RFI-CO-S-0262 00 KAIG3-RFI-CO-S-0262-00
KAIG3-RFI-CO-S-0261 00 KAIG3-RFI-CO-S-0261-00
KAIG3-RFI-CO-SU-0214 00 KAIG3-RFI-CO-SU-0214-00
KAIG3-RFI-CO-SU-0213 00 KAIG3-RFI-CO-SU-0213-00
KAIG3-RFI-CO-SU-0212 00 KAIG3-RFI-CO-SU-0212-00
KAIG3-RFI-TT-A-0142 00 KAIG3-RFI-TT-A-0142-00
KAIG3-RFI-TB-S-0260 00 KAIG3-RFI-TB-S-0260-00
KAIG3-RFI-CO-S-0259 00 KAIG3-RFI-CO-S-0259-00
KAIG3-RFI-CO-S-0258 00 KAIG3-RFI-CO-S-0258-00
KAIG3-RFI-CO-S-0257 00 KAIG3-RFI-CO-S-0257-00
KAIG3-RFI-CO-SU-0211 00 KAIG3-RFI-CO-SU-0211-00
KAIG3-RFI-CO-SU-0210 00 KAIG3-RFI-CO-SU-0210-00
KAIG3-RFI-CO-SU-0209 00 KAIG3-RFI-CO-SU-0209-00
KAIG3-RFI-BO-S-0255 00 KAIG3-RFI-BO-S-0255-00
KAIG3-RFI-BO-S-0256 00 KAIG3-RFI-BO-S-0256-00
KAIG3-RFI-BO-S-0254 00 KAIG3-RFI-BO-S-0254-00
KAIG3-RFI-CO-SU-0208 00 KAIG3-RFI-CO-SU-0208-00
KAIG3-RFI-CO-SU-0207 00 KAIG3-RFI-CO-SU-0207-00
KAIG3-RFI-BO-LC-0002 00 KAIG3-RFI-BO-LC-0002-00
KAIG3-RFI-TG-SU-0201 00 KAIG3-RFI-TG-SU-0201-00
KAIG3-RFI-DG-SU-0203 00 KAIG3-RFI-DG-SU-0203-00
KAIG3-RFI-ZG-SU-0202 00 KAIG3-RFI-ZG-SU-0202-00
KAIG3-RFI-BO-S-0248 00 KAIG3-RFI-BO-S-0248-00
KAIG3-RFI-CO-S-0253 00 KAIG3-RFI-CO-S-0253-00
KAIG3-RFI-CO-S-0252 00 KAIG3-RFI-CO-S-0252-00
KAIG3-RFI-CO-S-0251 00 KAIG3-RFI-CO-S-0251-00
KAIG3-RFI-CO-SU-0206 00 KAIG3-RFI-CO-SU-0206-00
KAIG3-RFI-CO-SU-0205 00 KAIG3-RFI-CO-SU-0205-00
KAIG3-RFI-CO-SU-0204 00 KAIG3-RFI-CO-SU-0204-00
KAIG3-RFI-TT-S-0250 00 KAIG3-RFI-TT-S-0250-00
KAIG3-RFI-BO-A-0144 00 KAIG3-RFI-BO-A-0144-00
KAIG3-RFI-BO-A-0143 00 KAIG3-RFI-BO-A-0143-00
KAIG3-RFI-BO-S-0249 00 KAIG3-RFI-BO-S-0249-00
KAIG3-RFI-TB-P-0001 00 KAIG3-RFI-TB-P-0001-00
KAIG3-RFI-CO-S-0247 00 KAIG3-RFI-CO-S-0247-00
KAIG3-RFI-CO-SU-0200 00 KAIG3-RFI-CO-SU-0200-00
KAIG3-RFI-CO-S-0246 00 KAIG3-RFI-CO-S-0246-00
KAIG3-RFI-CO-S-0245 00 KAIG3-RFI-CO-S-0245-00
KAIG3-RFI-CO-S-0180 00 KAIG3-RFI-CO-S-0180-00
KAIG3-RFI-CO-SU-0199 00 KAIG3-RFI-CO-SU-0199-00
KAIG3-RFI-CO-SU-0031 00 KAIG3-RFI-CO-SU-0031-00
KAIG3-RFI-CO-S-0244 00 KAIG3-RFI-CO-S-0244-00
KAIG3-RFI-CO-S-0243 00 KAIG3-RFI-CO-S-0243-00
KAIG3-RFI-CO-S-0242 00 KAIG3-RFI-CO-S-0242-00
KAIG3-RFI-CO-S-0241 00 KAIG3-RFI-CO-S-0241-00
KAIG3-RFI-CO-S-0240 00 KAIG3-RFI-CO-S-0240-00
KAIG3-RFI-BO-S-0239 00 KAIG3-RFI-BO-S-0239-00
KAIG3-RFI-CO-S-0238 00 KAIG3-RFI-CO-S-0238-00
KAIG3-RFI-CO-S-0237 00 KAIG3-RFI-CO-S-0237-00
KAIG3-RFI-CO-S-0236 00 KAIG3-RFI-CO-S-0236-00
KAIG3-RFI-CO-S-0235 00 KAIG3-RFI-CO-S-0235-00
KAIG3-RFI-CO-S-0234 00 KAIG3-RFI-CO-S-0234-00
KAIG3-RFI-CO-SU-0198 00 KAIG3-RFI-CO-SU-0198-00
KAIG3-RFI-CO-SU-0195 00 KAIG3-RFI-CO-SU-0195-00
KAIG3-RFI-CO-SU-0194 00 KAIG3-RFI-CO-SU-0194-00
KAIG3-RFI-CO-SU-0197 00 KAIG3-RFI-CO-SU-0197-00
KAIG3-RFI-CO-SU-0196 00 KAIG3-RFI-CO-SU-0196-00
KAIG3-RFI-CO-S-0232 00 KAIG3-RFI-CO-S-0232-00
KAIG3-RFI-CO-S-0231 00 KAIG3-RFI-CO-S-0231-00
KAIG3-RFI-CO-S-0229 00 KAIG3-RFI-CO-S-0229-00
KAIG3-RFI-CO-S-0228 00 KAIG3-RFI-CO-S-0228-00
KAIG3-RFI-CO-S-0227 00 KAIG3-RFI-CO-S-0227-00
KAIG3-RFI-CO-S-0226 00 KAIG3-RFI-CO-S-0226-00
KAIG3-RFI-CO-S-0230 00 KAIG3-RFI-CO-S-0230-00
KAIG3-RFI-CO-S-0233 00 KAIG3-RFI-CO-S-0233-00
KAIG3-RFI-PT-S-0224 00 KAIG3-RFI-PT-S-0224-00
KAIG3-RFI-BO-A-0141 00 KAIG3-RFI-BO-A-0141-00
KAIG3-RFI-CO-S-0224 00 KAIG3-RFI-CO-S-0224-00
KAIG3-RFI-CO-S-0223 00 KAIG3-RFI-CO-S-0223-00
KAIG3-RFI-CO-SU-0193 00 KAIG3-RFI-CO-SU-0193-00
KAIG3-RFI-CO-SU-0192 00 KAIG3-RFI-CO-SU-0192-00
KAIG3-RFI-CO-S-0222 00 KAIG3-RFI-CO-S-0222-00
KAIG3-RFI-CO-S-0221 00 KAIG3-RFI-CO-S-0221-00
KAIG3-RFI-CO-S-0219 00 KAIG3-RFI-CO-S-0219-00
KAIG3-RFI-CO-S-0218 00 KAIG3-RFI-CO-S-0218-00
KAIG3-RFI-CO-S-0217 00 KAIG3-RFI-CO-S-0217-00
KAIG3-RFI-CO-S-0216 00 KAIG3-RFI-CO-S-0216-00
KAIG3-RFI-CO-SU-0191 00 KAIG3-RFI-CO-SU-0191-00
KAIG3-RFI-PT-S-0220 00 KAIG3-RFI-PT-S-0220-00
KAIG3-RFI-CO-S-0215 00 KAIG3-RFI-CO-S-0215-00
KAIG3-RFI-CO-S-0209 00 KAIG3-RFI-CO-S-0209-00
KAIG3-RFI-CO-S-0214 00 KAIG3-RFI-CO-S-0214-00
KAIG3-RFI-CO-S-0213 00 KAIG3-RFI-CO-S-0213-00
KAIG3-RFI-CO-S-0212 00 KAIG3-RFI-CO-S-0212-00
KAIG3-RFI-CO-S-0211 00 KAIG3-RFI-CO-S-0211-00
KAIG3-RFI-CO-S-0210 00 KAIG3-RFI-CO-S-0210-00
KAIG3-RFI-CO-S-0208 00 KAIG3-RFI-CO-S-0208-00
KAIG3-RFI-CO-S-0207 00 KAIG3-RFI-CO-S-0207-00
KAIG3-RFI-CO-S-0206 00 KAIG3-RFI-CO-S-0206-00
KAIG3-RFI-CO-S-0205 00 KAIG3-RFI-CO-S-0205-00
KAIG3-RFI-GN-LS-0002 02 KAIG3-RFI-GN-LS-0002-02
KAIG3-RFI-BO-A-0139 01 KAIG3-RFI-BO-A-0139-01
KAIG3-RFI-TB-S-0202 00 KAIG3-RFI-TB-S-0202-00
KAIG3-RFI-CO-S-0204 00 KAIG3-RFI-CO-S-0204-00
KAIG3-RFI-CO-S-0203 00 KAIG3-RFI-CO-S-0203-00
KAIG3-RFI-CO-SU-0190 00 KAIG3-RFI-CO-SU-0190-00
KAIG3-RFI-CO-SU-0189 00 KAIG3-RFI-CO-SU-0189-00
KAIG3-RFI-CO-SU-0188 00 KAIG3-RFI-CO-SU-0188-00
KAIG3-RFI-TB-S-0201 00 KAIG3-RFI-TB-S-0201-00
KAIG3-RFI-TB-S-0200 00 KAIG3-RFI-TB-S-0200-00
KAIG3-RFI-TB-S-0179 00 KAIG3-RFI-TB-S-0179-00
KAIG3-RFI-TB-S-0178 00 KAIG3-RFI-TB-S-0178-00
KAIG3-RFI-PT-A-0140 00 KAIG3-RFI-PT-A-0140-00
KAIG3-RFI-CO-SU-0187 00 KAIG3-RFI-CO-SU-0187-00
KAIG3-RFI-CO-SU-0186 00 KAIG3-RFI-CO-SU-0186-00
KAIG3-RFI-CO-SU-0185 00 KAIG3-RFI-CO-SU-0185-00
KAIG3-RFI-CO-S-0198 00 KAIG3-RFI-CO-S-0198-00
KAIG3-RFI-CO-S-0197 00 KAIG3-RFI-CO-S-0197-00
KAIG3-RFI-CO-S-0196 00 KAIG3-RFI-CO-S-0196-00
KAIG3-RFI-CO-S-0195 00 KAIG3-RFI-CO-S-0195-00
KAIG3-RFI-CO-S-0194 00 KAIG3-RFI-CO-S-0194-00
KAIG3-RFI-TB-S-0176 01 KAIG3-RFI-TB-S-0176-01
KAIG3-RFI-TB-S-0177 01 KAIG3-RFI-TB-S-0177-01
KAIG3-RFI-CO-S-0193 00 KAIG3-RFI-CO-S-0193-00
KAIG3-RFI-CO-S-0192 00 KAIG3-RFI-CO-S-0192-00
KAIG3-RFI-CO-S-0191 00 KAIG3-RFI-CO-S-0191-00
KAIG3-RFI-CO-S-0190 00 KAIG3-RFI-CO-S-0190-00
KAIG3-RFI-CO-S-0189 00 KAIG3-RFI-CO-S-0189-00
KAIG3-RFI-CO-SU-0184 00 KAIG3-RFI-CO-SU-0184-00
KAIG3-RFI-CO-SU-0183 00 KAIG3-RFI-CO-SU-0183-00
KAIG3-RFI-CO-SU-0182 00 KAIG3-RFI-CO-SU-0182-00
KAIG3-RFI-CO-SU-0181 00 KAIG3-RFI-CO-SU-0181-00
KAIG3-RFI-CO-SU-0180 00 KAIG3-RFI-CO-SU-0180-00
KAIG3-RFI-CO-SU-0179 00 KAIG3-RFI-CO-SU-0179-00
KAIG3-RFI-CO-SU-0178 00 KAIG3-RFI-CO-SU-0178-00
KAIG3-RFI-CO-S-0188 00 KAIG3-RFI-CO-S-0188-00
KAIG3-RFI-PT-S-0186 00 KAIG3-RFI-PT-S-0186-00
KAIG3-RFI-CO-S-0187 00 KAIG3-RFI-CO-S-0187-00
KAIG3-RFI-GN-LS-0002 01 KAIG3-RFI-GN-LS-0002-01
KAIG3-RFI-TB-S-0181 00 KAIG3-RFI-TB-S-0181-00
KAIG3-RFI-CO-S-0185 00 KAIG3-RFI-CO-S-0185-00
KAIG3-RFI-CO-S-0184 00 KAIG3-RFI-CO-S-0184-00
KAIG3-RFI-CO-S-0183 00 KAIG3-RFI-CO-S-0183-00
KAIG3-RFI-CO-SU-0177 00 KAIG3-RFI-CO-SU-0177-00
KAIG3-RFI-CO-SU-0176 00 KAIG3-RFI-CO-SU-0176-00
KAIG3-RFI-CO-SU-0175 00 KAIG3-RFI-CO-SU-0175-00
KAIG3-RFI-BO-A-0136 01 KAIG3-RFI-BO-A-0136-01
KAIG3-RFI-BO-A-0139 00 KAIG3-RFI-BO-A-0139-00
KAIG3-RFI-CO-S-0160 01 KAIG3-RFI-CO-S-0160-01
KAIG3-RFI-CO-SU-0174 00 KAIG3-RFI-CO-SU-0174-00
KAIG3-RFI-PT-A-0138 00 KAIG3-RFI-PT-A-0138-00
KAIG3-RFI-TT-A-0137 01 KAIG3-RFI-TT-A-0137-01
KAIG3-RFI-TB-SU-0162 01 KAIG3-RFI-TB-SU-0162-01
KAIG3-RFI-TB-S-0177 00 KAIG3-RFI-TB-S-0177-00
KAIG3-RFI-TB-S-0176 00 KAIG3-RFI-TB-S-0176-00
KAIG3-RFI-CO-SU-0173 00 KAIG3-RFI-CO-SU-0173-00
KAIG3-RFI-CO-SU-0172 00 KAIG3-RFI-CO-SU-0172-00
KAIG3-RFI-CO-S-0175 00 KAIG3-RFI-CO-S-0175-00
KAIG3-RFI-CO-S-0174 00 KAIG3-RFI-CO-S-0174-00
KAIG3-RFI-CO-S-0073 02 KAIG3-RFI-CO-S-0073-02
KAIG3-RFI-CO-SU-0171 00 KAIG3-RFI-CO-SU-0171-00
KAIG3-RFI-CO-S-0172 00 KAIG3-RFI-CO-S-0172-00
KAIG3-RFI-CO-S-0171 00 KAIG3-RFI-CO-S-0171-00
KAIG3-RFI-CO-S-0156 01 KAIG3-RFI-CO-S-0156-01
KAIG3-RFI-CO-S-0169 00 KAIG3-RFI-CO-S-0169-00
KAIG3-RFI-CO-S-0170 00 KAIG3-RFI-CO-S-0170-00
KAIG3-RFI-CO-SU-0170 00 KAIG3-RFI-CO-SU-0170-00
KAIG3-RFI-TT-S-0168 00 KAIG3-RFI-TT-S-0168-00
KAIG3-RFI-CO-SU-0169 00 KAIG3-RFI-CO-SU-0169-00
KAIG3-RFI-GN-SU-0160 00 KAIG3-RFI-GN-SU-0160-00
KAIG3-RFI-TT-A-0137 00 KAIG3-RFI-TT-A-0137-00
KAIG3-RFI-CO-SU-0168 00 KAIG3-RFI-CO-SU-0168-00
KAIG3-RFI-CO-SU-0161 01 KAIG3-RFI-CO-SU-0161-01
KAIG3-RFI-CO-S-0167 00 KAIG3-RFI-CO-S-0167-00
KAIG3-RFI-CO-S-0165 00 KAIG3-RFI-CO-S-0165-00
KAIG3-RFI-CO-SU-0163 00 KAIG3-RFI-CO-SU-0163-00
KAIG3-RFI-CO-SU-0167 00 KAIG3-RFI-CO-SU-0167-00
KAIG3-RFI-CO-SU-0165 00 KAIG3-RFI-CO-SU-0165-00
KAIG3-RFI-CO-SU-0164 00 KAIG3-RFI-CO-SU-0164-00
KAIG3-RFI-GN-SU-0166 00 KAIG3-RFI-GN-SU-0166-00
KAIG3-RFI-TB-SU-0162 00 KAIG3-RFI-TB-SU-0162-00
KAIG3-RFI-CO-S-0163 00 KAIG3-RFI-CO-S-0163-00
KAIG3-RFI-CO-S-0162 00 KAIG3-RFI-CO-S-0162-00
KAIG3-RFI-CO-S-0161 00 KAIG3-RFI-CO-S-0161-00
KAIG3-RFI-CO-SU-0161 00 KAIG3-RFI-CO-SU-0161-00
KAIG3-RFI-GN-LS-0002 00 KAIG3-RFI-GN-LS-0002-00
KAIG3-RFI-GN-LS-0001 00 KAIG3-RFI-GN-LS-0001-00
KAIG3-RFI-BO-A-0136 00 KAIG3-RFI-BO-A-0136-00
KAIG3-RFI-CO-SU-0159 00 KAIG3-RFI-CO-SU-0159-00
KAIG3-RFI-CO-SU-0158 00 KAIG3-RFI-CO-SU-0158-00
KAIG3-RFI-CO-S-0159 00 KAIG3-RFI-CO-S-0159-00
KAIG3-RFI-CO-S-0158 00 KAIG3-RFI-CO-S-0158-00
KAIG3-RFI-CO-S-0157 00 KAIG3-RFI-CO-S-0157-00
KAIG3-RFI-CO-SU-0157 00 KAIG3-RFI-CO-SU-0157-00
KAIG3-RFI-CO-SU-0156 00 KAIG3-RFI-CO-SU-0156-00
KAIG3-RFI-CO-SU-0155 00 KAIG3-RFI-CO-SU-0155-00
KAIG3-RFI-CO-S-0086 01 KAIG3-RFI-CO-S-0086-01
KAIG3-RFI-CO-S-0082 01 KAIG3-RFI-CO-S-0082-01
KAIG3-RFI-GN-SU-0154 00 KAIG3-RFI-GN-SU-0154-00
KAIG3-RFI-CO-S-0156 00 KAIG3-RFI-CO-S-0156-00
KAIG3-RFI-TB-SU-0153 00 KAIG3-RFI-TB-SU-0153-00
KAIG3-RFI-CO-SU-0152 00 KAIG3-RFI-CO-SU-0152-00
KAIG3-RFI-CO-SU-0151 00 KAIG3-RFI-CO-SU-0151-00
KAIG3-RFI-CO-S-0155 00 KAIG3-RFI-CO-S-0155-00
KAIG3-RFI-CO-SU-0143 00 KAIG3-RFI-CO-SU-0143-00
KAIG3-RFI-CO-S-0079 01 KAIG3-RFI-CO-S-0079-01
KAIG3-RFI-CO-S-0077 01 KAIG3-RFI-CO-S-0077-01
KAIG3-RFI-CO-S-0075 01 KAIG3-RFI-CO-S-0075-01
KAIG3-RFI-CO-S-0154 00 KAIG3-RFI-CO-S-0154-00
KAIG3-RFI-CO-S-0153 00 KAIG3-RFI-CO-S-0153-00
KAIG3-RFI-CO-S-0152 00 KAIG3-RFI-CO-S-0152-00
KAIG3-RFI-CO-S-0151 00 KAIG3-RFI-CO-S-0151-00
KAIG3-RFI-CO-S-0150 00 KAIG3-RFI-CO-S-0150-00
KAIG3-RFI-CO-S-0149 00 KAIG3-RFI-CO-S-0149-00
KAIG3-RFI-CO-SU-0150 00 KAIG3-RFI-CO-SU-0150-00
KAIG3-RFI-CO-SU-0147 00 KAIG3-RFI-CO-SU-0147-00
KAIG3-RFI-CO-SU-0148 00 KAIG3-RFI-CO-SU-0148-00
KAIG3-RFI-CO-SU-0146 00 KAIG3-RFI-CO-SU-0146-00
KAIG3-RFI-GN-SU-0149 00 KAIG3-RFI-GN-SU-0149-00
KAIG3-RFI-CO-S-0148 00 KAIG3-RFI-CO-S-0148-00
KAIG3-RFI-CO-S-0147 00 KAIG3-RFI-CO-S-0147-00
KAIG3-RFI-CO-S-0146 00 KAIG3-RFI-CO-S-0146-00
KAIG3-RFI-CO-S-0144 00 KAIG3-RFI-CO-S-0144-00
KAIG3-RFI-CO-S-0143 00 KAIG3-RFI-CO-S-0143-00
KAIG3-RFI-CO-S-0142 00 KAIG3-RFI-CO-S-0142-00
KAIG3-RFI-CO-S-0141 00 KAIG3-RFI-CO-S-0141-00
KAIG3-RFI-CO-S-0137 00 KAIG3-RFI-CO-S-0137-00
KAIG3-RFI-CO-S-0136 00 KAIG3-RFI-CO-S-0136-00
KAIG3-RFI-CO-S-0125 00 KAIG3-RFI-CO-S-0125-00
KAIG3-RFI-CO-S-0124 00 KAIG3-RFI-CO-S-0124-00
KAIG3-RFI-CO-SU-0145 00 KAIG3-RFI-CO-SU-0145-00
KAIG3-RFI-CO-SU-0144 00 KAIG3-RFI-CO-SU-0144-00
KAIG3-RFI-BO-LC-0001 00 KAIG3-RFI-BO-LC-0001-00
KAIG3-RFI-CO-SU-0142 00 KAIG3-RFI-CO-SU-0142-00
KAIG3-RFI-CO-SU-0141 00 KAIG3-RFI-CO-SU-0141-00
KAIG3-RFI-CO-SU-0140 00 KAIG3-RFI-CO-SU-0140-00
KAIG3-RFI-CO-S-0145 00 KAIG3-RFI-CO-S-0145-00
KAIG3-RFI-CO-S-0138 01 KAIG3-RFI-CO-S-0138-01
KAIG3-RFI-BO-A-0094 00 KAIG3-RFI-BO-A-0094-00
KAIG3-RFI-CO-SU-0139 00 KAIG3-RFI-CO-SU-0139-00
KAIG3-RFI-CO-SU-0138 00 KAIG3-RFI-CO-SU-0138-00
KAIG3-RFI-CO-SU-0137 00 KAIG3-RFI-CO-SU-0137-00
KAIG3-RFI-CO-SU-0136 00 KAIG3-RFI-CO-SU-0136-00
KAIG3-RFI-GN-S-0140 00 KAIG3-RFI-GN-S-0140-00
KAIG3-RFI-CO-S-0139 00 KAIG3-RFI-CO-S-0139-00
KAIG3-RFI-BO-A-0134 00 KAIG3-RFI-BO-A-0134-00
KAIG3-RFI-BO-A-0089 01 KAIG3-RFI-BO-A-0089-01
KAIG3-RFI-CO-S-0138 00 KAIG3-RFI-CO-S-0138-00
KAIG3-RFI-CO-SU-0135 00 KAIG3-RFI-CO-SU-0135-00
KAIG3-RFI-CO-SU-0134 00 KAIG3-RFI-CO-SU-0134-00
KAIG3-RFI-CO-SU-0133 00 KAIG3-RFI-CO-SU-0133-00
KAIG3-RFI-CO-SU-0110 01 KAIG3-RFI-CO-SU-0110-01
KAIG3-RFI-CO-S-0135 00 KAIG3-RFI-CO-S-0135-00
KAIG3-RFI-CO-S-0134 00 KAIG3-RFI-CO-S-0134-00
KAIG3-RFI-CO-SU-0132 00 KAIG3-RFI-CO-SU-0132-00
KAIG3-RFI-GN-S-0131 00 KAIG3-RFI-GN-S-0131-00
KAIG3-RFI-CO-SU-0130 00 KAIG3-RFI-CO-SU-0130-00
KAIG3-RFI-CO-SU-0129 00 KAIG3-RFI-CO-SU-0129-00
KAIG3-RFI-CO-SU-0128 00 KAIG3-RFI-CO-SU-0128-00
KAIG3-RFI-BO-A-0127 00 KAIG3-RFI-BO-A-0127-00
KAIG3-RFI-CO-S-0126 00 KAIG3-RFI-CO-S-0126-00
KAIG3-RFI-CO-SU-0123 00 KAIG3-RFI-CO-SU-0123-00
KAIG3-RFI-CO-SU-0122 00 KAIG3-RFI-CO-SU-0122-00
KAIG3-RFI-CO-SU-0121 00 KAIG3-RFI-CO-SU-0121-00
KAIG3-RFI-GN-A-0035 01 KAIG3-RFI-GN-A-0035-01
KAIG3-RFI-GN-S-0008 01 KAIG3-RFI-GN-S-0008-01
KAIG3-RFI-CO-C-0019 01 KAIG3-RFI-CO-C-0019-01
KAIG3-RFI-GN-S-0027 01 KAIG3-RFI-GN-S-0027-01
KAIG3-RFI-CO-SU-0074 00 KAIG3-RFI-CO-SU-0074-00
KAIG3-RFI-CO-SU-0047 00 KAIG3-RFI-CO-SU-0047-00
KAIG3-RFI-BG-SU-0046 00 KAIG3-RFI-BG-SU-0046-00
KAIG3-RFI-ZG-SU-0045 00 KAIG3-RFI-ZG-SU-0045-00
KAIG3-RFI-WG-SU-0044 00 KAIG3-RFI-WG-SU-0044-00
KAIG3-RFI-GG-SU-0043 00 KAIG3-RFI-GG-SU-0043-00
KAIG3-RFI-CO-SU-0041 00 KAIG3-RFI-CO-SU-0041-00
KAIG3-RFI-CO-S-0119 00 KAIG3-RFI-CO-S-0119-00
KAIG3-RFI-CO-S-0109 01 KAIG3-RFI-CO-S-0109-01
KAIG3-RFI-CO-SU-0120 00 KAIG3-RFI-CO-SU-0120-00
KAIG3-RFI-CO-SU-0118 00 KAIG3-RFI-CO-SU-0118-00
KAIG3-RFI-CO-SU-0117 00 KAIG3-RFI-CO-SU-0117-00
KAIG3-RFI-CO-SU-0116 00 KAIG3-RFI-CO-SU-0116-00
KAIG3-RFI-CO-SU-0040 00 KAIG3-RFI-CO-SU-0040-00
KAIG3-RFI-CO-SU-0039 00 KAIG3-RFI-CO-SU-0039-00
KAIG3-RFI-CO-SU-0038 00 KAIG3-RFI-CO-SU-0038-00
KAIG3-RFI-CO-SU-0037 00 KAIG3-RFI-CO-SU-0037-00
KAIG3-RFI-CO-SU-0036 00 KAIG3-RFI-CO-SU-0036-00
KAIG3-RFI-CO-S-0115 00 KAIG3-RFI-CO-S-0115-00
KAIG3-RFI-CO-SU-0034 00 KAIG3-RFI-CO-SU-0034-00
KAIG3-RFI-CO-SU-0112 00 KAIG3-RFI-CO-SU-0112-00
KAIG3-RFI-CO-SU-0111 00 KAIG3-RFI-CO-SU-0111-00
KAIG3-RFI-CO-SU-0108 00 KAIG3-RFI-CO-SU-0108-00
KAIG3-RFI-CO-SU-0033 00 KAIG3-RFI-CO-SU-0033-00
KAIG3-RFI-GN-A-0030 00 KAIG3-RFI-GN-A-0030-00
KAIG3-RFI-GN-S-0027 00 KAIG3-RFI-GN-S-0027-00
KAIG3-RFI-GN-A-0028 01 KAIG3-RFI-GN-A-0028-01
KAIG3-RFI-CO-SU-0110 00 KAIG3-RFI-CO-SU-0110-00
KAIG3-RFI-CO-S-0109 00 KAIG3-RFI-CO-S-0109-00
KAIG3-RFI-GN-S-0023 00 KAIG3-RFI-GN-S-0023-00
KAIG3-RFI-CO-SU-0021 01 KAIG3-RFI-CO-SU-0021-01
KAIG3-RFI-CO-C-0019 00 KAIG3-RFI-CO-C-0019-00
KAIG3-RFI-GN-S-0012 00 KAIG3-RFI-GN-S-0012-00
KAIG3-RFI-GN-SU-0016 00 KAIG3-RFI-GN-SU-0016-00
KAIG3-RFI-CO-SU-0107 00 KAIG3-RFI-CO-SU-0107-00
KAIG3-RFI-CO-S-0106 00 KAIG3-RFI-CO-S-0106-00
KAIG3-RFI-GN-S-0011 00 KAIG3-RFI-GN-S-0011-00
KAIG3-RFI-CO-SU-0105 00 KAIG3-RFI-CO-SU-0105-00
KAIG3-RFI-GN-S-0009 00 KAIG3-RFI-GN-S-0009-00
KAIG3-RFI-GN-S-0008 00 KAIG3-RFI-GN-S-0008-00
KAIG3-RFI-CO-S-0007 00 KAIG3-RFI-CO-S-0007-00
KAIG3-RFI-GN-S-0006 00 KAIG3-RFI-GN-S-0006-00
KAIG3-RFI-GN-C-0005 00 KAIG3-RFI-GN-C-0005-00
KAIG3-RFI-GN-SU-0004 00 KAIG3-RFI-GN-SU-0004-00
KAIG3-RFI-GN-A-0028 00 KAIG3-RFI-GN-A-0028-00
KAIG3-RFI-GN-S-0013 00 KAIG3-RFI-GN-S-0013-00
KAIG3-RFI-GN-A-0035 00 KAIG3-RFI-GN-A-0035-00
KAIG3-RFI-CO-SU-0101 01 KAIG3-RFI-CO-SU-0101-01
KAIG3-RFI-BO-A-0056 00 KAIG3-RFI-BO-A-0056-00
KAIG3-RFI-GN-G-0059 00 KAIG3-RFI-GN-G-0059-00
KAIG3-RFI-CO-SU-0063 00 KAIG3-RFI-CO-SU-0063-00
KAIG3-RFI-CO-SU-0052 00 KAIG3-RFI-CO-SU-0052-00
KAIG3-RFI-CO-SU-0020 00 KAIG3-RFI-CO-SU-0020-00
KAIG3-RFI-CO-SU-0021 00 KAIG3-RFI-CO-SU-0021-00
KAIG3-RFI-CO-SU-0025 00 KAIG3-RFI-CO-SU-0025-00
KAIG3-RFI-CO-SU-0032 00 KAIG3-RFI-CO-SU-0032-00
KAIG3-RFI-CO-S-0103 00 KAIG3-RFI-CO-S-0103-00
KAIG3-RFI-CO-S-0102 00 KAIG3-RFI-CO-S-0102-00
KAIG3-RFI-GN-SU-0104 00 KAIG3-RFI-GN-SU-0104-00
KAIG3-RFI-BO-A-0070 02 KAIG3-RFI-BO-A-0070-02
KAIG3-RFI-GN-C-0014 00 KAIG3-RFI-GN-C-0014-00
KAIG3-RFI-CO-SU-0101 00 KAIG3-RFI-CO-SU-0101-00
KAIG3-RFI-AG-SU-0042 00 KAIG3-RFI-AG-SU-0042-00
KAIG3-RFI-CO-S-0073 00 KAIG3-RFI-CO-S-0073-00
KAIG3-RFI-CO-S-0100 00 KAIG3-RFI-CO-S-0100-00
KAIG3-RFI-CO-S-0099 00 KAIG3-RFI-CO-S-0099-00
KAIG3-RFI-GN-SU-0098 00 KAIG3-RFI-GN-SU-0098-00
KAIG3-RFI-CO-SU-0097 00 KAIG3-RFI-CO-SU-0097-00
KAIG3-RFI-CO-C-0096 00 KAIG3-RFI-CO-C-0096-00
KAIG3-RFI-BO-S-0093 00 KAIG3-RFI-BO-S-0093-00
KAIG3-RFI-PT-A-0083 01 KAIG3-RFI-PT-A-0083-01
KAIG3-RFI-TT-A-0081 01 KAIG3-RFI-TT-A-0081-01
KAIG3-RFI-MB-A-0080 01 KAIG3-RFI-MB-A-0080-01
KAIG3-RFI-CO-S-0092 00 KAIG3-RFI-CO-S-0092-00
KAIG3-RFI-CO-S-0091 00 KAIG3-RFI-CO-S-0091-00
KAIG3-RFI-CO-SU-0090 00 KAIG3-RFI-CO-SU-0090-00
KAIG3-RFI-BO-A-0070 01 KAIG3-RFI-BO-A-0070-01
KAIG3-RFI-BO-A-0089 00 KAIG3-RFI-BO-A-0089-00
KAIG3-RFI-CO-S-0079 00 KAIG3-RFI-CO-S-0079-00
KAIG3-RFI-CO-S-0077 00 KAIG3-RFI-CO-S-0077-00
KAIG3-RFI-CO-S-0075 00 KAIG3-RFI-CO-S-0075-00
KAIG3-RFI-GN-SU-0087 00 KAIG3-RFI-GN-SU-0087-00
KAIG3-RFI-CO-S-0086 00 KAIG3-RFI-CO-S-0086-00
KAIG3-RFI-CO-SU-0078 00 KAIG3-RFI-CO-SU-0078-00
KAIG3-RFI-CO-S-0082 00 KAIG3-RFI-CO-S-0082-00
KAIG3-RFI-GN-SU-0085 00 KAIG3-RFI-GN-SU-0085-00
KAIG3-RFI-PT-A-0083 00 KAIG3-RFI-PT-A-0083-00
KAIG3-RFI-TT-A-0081 00 KAIG3-RFI-TT-A-0081-00
KAIG3-RFI-MB-A-0080 00 KAIG3-RFI-MB-A-0080-00
KAIG3-RFI-GN-G-0059 01 KAIG3-RFI-GN-G-0059-01
KAIG3-RFI-GN-SU-0068 01 KAIG3-RFI-GN-SU-0068-01
KAIG3-RFI-CO-S-0073 01 KAIG3-RFI-CO-S-0073-01
KAIG3-RFI-GN-SU-0076 00 KAIG3-RFI-GN-SU-0076-00
KAIG3-RFI-CO-SU-0072 00 KAIG3-RFI-CO-SU-0072-00
KAIG3-RFI-CO-SU-0069 00 KAIG3-RFI-CO-SU-0069-00
KAIG3-RFI-GN-SU-0068 00 KAIG3-RFI-GN-SU-0068-00
KAIG3-RFI-BO-A-0071 00 KAIG3-RFI-BO-A-0071-00
KAIG3-RFI-BO-A-0070 00 KAIG3-RFI-BO-A-0070-00
KAIG3-RFI-ZG-SU-0067 00 KAIG3-RFI-ZG-SU-0067-00
KAIG3-RFI-GN-SU-0066 00 KAIG3-RFI-GN-SU-0066-00
KAIG3-RFI-CO-SU-0065 00 KAIG3-RFI-CO-SU-0065-00
KAIG3-RFI-VA-SU-0064 00 KAIG3-RFI-VA-SU-0064-00
KAIG3-RFI-CO-S-0062 00 KAIG3-RFI-CO-S-0062-00
KAIG3-RFI-CO-SU-0061 00 KAIG3-RFI-CO-SU-0061-00
KAIG3-RFI-TG-SU-0060 00 KAIG3-RFI-TG-SU-0060-00
KAIG3-RFI-DG-SU-0058 00 KAIG3-RFI-DG-SU-0058-00
KAIG3-RFI-BO-A-0057 00 KAIG3-RFI-BO-A-0057-00
KAIG3-RFI-GN-SU-0055 00 KAIG3-RFI-GN-SU-0055-00
KAIG3-RFI-GN-SU-0054 00 KAIG3-RFI-GN-SU-0054-00
KAIG3-RFI-BO-A-0053 00 KAIG3-RFI-BO-A-0053-00
KAIG3-RFI-CO-SU-0051 00 KAIG3-RFI-CO-SU-0051-00
KAIG3-RFI-PA-SU-0050 00 KAIG3-RFI-PA-SU-0050-00
KAIG3-RFI-GN-SU-0049 00 KAIG3-RFI-GN-SU-0049-00
KAIG3-RFI-GN-SU-0048 00 KAIG3-RFI-GN-SU-0048-00
Title
Installed Base Extrusion and Base Seal between Axis A-B/01-02I.
Installation of straight PVC Conduit (Dia. 25mm) & Boxes for Lighting System (LED N) at Ground Floor
Installation of straight UPVC Conduit (Dia. 160mm) Medium Voltage Ductbank no. GG/D-MV/32 (G/MV
Installation of UPVC Conduit (Dia. 75mm) for Low Voltage (Normal Lighting) Ductbank (MH/WG/LV/34
Installation of PVC Conduit (Dia. 25mm) for Lighting (LED W11, W11/CE) at First Floor in the North
Inspection and Compaction test for Laying of Sub-grade 2nd Layer (2 of 2) for Embankment of Security
Inspection and Compaction test for Laying of Sub-grade 2nd Layer (2 of 2) for Embankment of Security
Inspection for Casting the Blinding Concrete under the storm line Manhole MH-N-09, MH-N-08, MH-
Excavation for fence cctv line between D/CCTV/20 & E/CCTV/01 - Including CCTV Pit D/CCTV/26, D/C
Inspection of Sand bedding for LV Line From B/LV/21 to B/LV/29 at Zone-B - as highlighted (Sand from S
Inspection and Compaction test for backfilling Sub-base 1st Layer (1 of 1) under Boulder No. WRB-49 (S
Inspection of Excavation for Fire Water Line Pit- H/F/03 at Zone-H - as highlighted
Inspection and Compaction test for backfilling Sub-grade 2nd Layer (2 of 2) under Boulder No. WRB-40 (
Inspection and Compaction test for backfilling Sub-base 1st Layer (1 of 1) under Boulder No. WRB-40 (S
Inspection and Compaction test for backfilling Sub-grade 1st & 2nd Layer (1,2 of 2) above Sand cover fo
Surface Preparation prior to start backfilling for ROW Pit's ROW -ISC-06, ROW-ISC-05, ROW-ISC-04
Inspection and Compaction test for backfilling Sub-base 1st layer (1 of 2) above Sand cover for heat & c
Installation of Rock and Boulder No. WRB-06 - 1st layer (1 of 2)
Installation of Rock and Boulder No. WRB-06 - 2nd layer (2 of 2)
Installation of Rock and Boulder No. WRB-03 - 1st layer (1 of 8)
Installation of Rock and Boulder No. WRB-03 - 2nd layer (2 of 8)
Installation of Rock and Boulder No. WRB-03 - 3rd layer (3 of 8)
Installation of Rock and Boulder No. WRB-03 - 4th layer (4 of 8)
Installation of Rock and Boulder No. WRB-03 - 5th layer (5 of 8)
Installation of Rock and Boulder No. WRB-04 - 1st layer (1 of 3)
Installation of Rock and Boulder No. WRB-04 - 2nd layer (2 of 3)
Installation of Rock and Boulder No. WRB-04 - 3rd layer (3 of 3)
Installation of Rock and Boulder No. WRB-05 - 1st layer (1 of 3)
Installation of Rock and Boulder No. WRB-05 - 2nd layer (2 of 3)
Installation of Rock and Boulder No. WRB-05 - 3rd layer (3 of 3)
' Installation of Storm Water Pipes Main Line (Corrugated pipes PP 600mm Ø) Including (MH-N-06,MH
Inspection of Grouting (Horizontal & Vertical Joints) for Rock Boulder - WRB-04 for All Layers
'Bedding of Gravel 3/8" and Geotextile surrounding in Storm Water Pipes Main Line (Corrugated pip
Inspection of Grouting (Horizontal & Vertical Joints) for Rock Boulder - WRB-05 for All Layers
Inspection of Grouting (Horizontal & Vertical Joints) for Rock Boulder - WRB-06 for All Layers
Inspection of Grouting (Horizontal & Vertical Joints) for Rock Boulder - WRB-60 for All Layers
Inspection of Grouting (Horizontal & Vertical Joints) for Rock Boulder - WRB-47 for All Layers
Inspection of Grouting (Horizontal & Vertical Joints) for Rock Boulder - WRB-19 for All Layers
Inspection of Grouting (Horizontal & Vertical Joints) for Rock Boulder - WRB-18 for All Layers
Surface Preparation prior to start backfilling for LV Line pit at Zone- G/LV/03, G/LV/16, G/LV/44, G/LV/5
Inspection for Installation of MV Line Junction Pit - B/MV/18 - as highlighted
Inspection for Installation of MV Line Junction Pit - B/MV/16, G/MV/18, K/MV/02 - as highlighted
Inspection of Blinding Concrete under Heating & Chilled Water Line Isolation Pit for L/DC/13 at Zone-L -
Inspection of Blinding Concrete under MV Line Pit - D/MV/35, D/MV/34, D/MV/09, D/MV/36, D/MV/16,
Inspection of Blinding Concrete under RO Water Line Pit POC-01 & POC02 at Zone-B - As highlighted
Inspection for Installation of LV Line Pit - F/LV/21, F/LV/04, F/LV/24, F/LV/11, G/LV/24, G/LV/25, G/
Inspection of Excavation for LV Line From B/LV/40 to C/LV/08 at Zone-C Including Branch and Pits - C/LV
Inspection and Compaction test for backfilling Sub-grade 1st & 2nd Layer (1,2 of 2) above Sand cover fo
Inspection and Compaction test for backfilling Sub-grade 1st & 2nd Layer (1,2 of 2) above Sand cover fo
Inspectionand Compaction test for backfilling Sub-grade 1st & 2nd Layer (1,2 of 5) above Gravel aroun
Shuttering for Child Care roof slab, Zone 2N, Axis 02AR-02AT (As Highlighted)
Shuttering for North Administration Building First floor Slab ,Zone 2Q , Axis Between 02AX- 02AZ , Leve
Steel Reinforcement for Cafeteria Walls ( W20, W21 ), at Zone 2A , Axis 02C-02D (as highlighted)
Steel Reinforcement for Retaining Wall Beside Centerl Bridge Abutmemnt , Zone 4 ( as highlighted )
Shuttering and Concreting for Energy Center Columns , Zone 5A , Axis 1/C-I , 2/C-G , 13-14/D-H , Leve
Concreting for Infill wall ( Inner ) at Zone 1L , Axis 01AH-01AI , upto bottom and Ring Beam ( As Highligh
Shuttering and Concreting for Energy Center Column ( C4* ) , Zone 5A , Axis 6/A , Level upto 875.35 (A
Shuttering and Concreting for Energy Center Columns ( C3 and C4 ) , Zone 5A , Axis 4-5/A , Level upto 8
Shuttering and Concreting for Energy Center Beam , Axis 6-7/A (As Highlighted) Level 875.35
Shuttering and Concreting for Energy Center Wall ( W2 & W3 ) , Axis 14-16/L-R , Level upto 877.00 (As
Shuttering for Infill wall ( Inner ) at Zone 1L , Axis 01AH-01AI , upto bottom and Ring Beam ( As Highligh
Inspection and Compaction test for 1st Layer of Gravel for Retainig Wall, Zone 1G 1F , Between Axis 01R-
Surface Preparation Prior to start Backfilling for Retainig Wall, Zone 1G 1F , Between Axis 01R-01W( As H
Excavation and Bed Preparation Prior to start Backfilling for Chilled Water and District Heating ( As High
Level and Location for Energy Center Column ( C4* ) , Zone 5A , Axis 6/A , Level upto 875.35 (As Highli
Level and Location for Energy Center Beam , Axis 6-7/A (As Highlighted) Level 875.35
Level and Location for Infill wall ( Inner ) at Zone 1L , Axis 01AH-01AI , upto bottom and Ring Beam , Lev
Level and Location for Energy Center Columns , Zone 5A , Axis 1/C-I , 2/C-G , 13-14/D-H , Level from
Level and Location for Energy Center Wall ( W2 & W3 ) , Axis 14-16/L-R , Level upto 877.00 (As Highlight
Level and Location for MCPE 1 Duct Tunnel Wall , ZONE 2M 2N , Axis 03/R (as highlighted)
Installation and Survey Report of Installed Anchor Bolts at Energy Center , Axis 20-23/N , 23/O , 20-23/Q
Inspection of 2nd layer Gravel Backfilling (30cm ht) for Water Feature Over flow Line (Pipes dia 30
Inspection of 2nd layer Gravel Backfilling (30cm ht) for Water Feature Lines connecting to Decant su
Inspection of 4th Layer Gravel Backfilling (30cm ht) Surround the Decant Sump-D4 Inside Water Play
Inspection & Compaction tests of 2nd Layer (Sub Grade) Backfilling above Gravel for Sub Suface Line
Surface preparation prior to earth works (cut/fill) at Cenozoic Garden , Zone 1C 1D , Between Axis 01G-
Inspection and Compaction test for 9th and 10th Layer backfilling for Infill Wall ( Inner ) , Zone1C & 1D,
Inspection and Compcation test for 3rd Layer for Below hot and chilled Water Pipe Lines , Portable an
Inspection & Compaction tests of 1st Layer (Sub-grade) Backfilling above Gravel, Surround Wet Well E
Concrete Pouring for Slab on Grade, Inside Site Tower 4, as per the highlighted attached Drawings.
Concrete Pouring & Shuttering for Wall of Wet Well Beside Water Feature, at Management and M
Concrete Pouring & Shuttering For Foundation of Internal Garden at grid 3-13, Along boundary wall In
Inspection for Levels of Slab on Grade, Inside Site Tower 4, as per the highlighted attached Drawings.
Coordinates & Levels for Wall of Wet Well Beside Water Feature, at Management and Maintenance
Coordinates and levels For Foundation of Internal Garden at grid 3-13, Along boundary wall Inside Av
Steel Reinforcement for Infill wall ( Outer ) at Zone 1P , Between Axis 01AP-01AQ, Level upto 876.0
Concreting for Cafeteria Ground Floor Slab , at ZONE 2A , Axis 02A to 02D , Level 868.95 & 869.10 (as hi
Installation of straight UPVC Conduit (Dia. 160mm) Low Voltage Ductbank No. BB/D-LV/47 (B/LV/21 to
Installation of straight UPVC Conduit (Dia. 160mm) Medium Voltage Ductbank no. DD/D-MV/12 (fro
Inspection & Compaction tests of 1st Layer (Sub Grade) Backfilling above Gravel for Sub Suface Lines
Inspection & Compaction tests of 6th (Final) Layer (Sub Grade) Backfilling (upto top of kicker level
Concrete pouring and Shuttering For Walls of Internal Gardens (at section 06 & 08), Inside Aviary Gar
Coordinates and Levels For Walls of Internal Garden (at section 06), Inside Aviary Garden, As per High
Installation of straight UPVC Conduit (Dia. 160mm) Medium Voltage Ductbank no. DD/D-MV/29 (fro
Steel Reinforcement for Slab on Grade, Inside Site Tower 4, as per the highlighted attached Drawings
Inspection & Compaction tests of 3rd Layer (Sub-grade) Backfilling for Exposed Aggregate Paving Walk
Inspection & Compaction tests of Single Layer (Sub-Base) Backfilling above Warning tiles for Elect
Excavation for Electrical Lines Connecting to Handholes of Emergency (MH/WG/EM/20) & Low Voltag
Completion of Stacked Boulder Walls with Grouting for Installed Layers 1 & 2 for Planted beds (7 no'
Installation of Straight PVC Conduit (Dia. 25mm) and Boxes for Fire Alarm System (Flash Beacon) at
Installation of UPVC Conduit (4x110mm) Low Current Ductbank (TELECOM) Manhole (G/TL/27 to G/TL/3
Installation of UPVC Conduit (4x110mm) Low Current Ductbank (TELECOM) Manhole (G/TL/23 to G/TL/30)
Installation of UPVC Conduit (4x110mm) Low Current Ductbank (TELECOM) Manhole (G/TL/28 to L/TL/02
Installation of UPVC Conduit (2x110mm) Low Current Ductbank (Fire and Security) Manhole (G/FS/41 to
1st layer Block Work Laying for Retaining Block Wall at North Administration Building , at Zone 2R ,
Level and location for Cafeteria Columns ( C4, C5 ) at Zone 2A, Level From 869.10 to 872.70 (as highligh
Concreting for Diaphragm wall RC footing, at Zone 2K , Axis 02AH, Level up to 867.50 (as highlighted)
Level and location for Diaphragm wall RC footing, at Zone 2K , Axis 02AH, Level up to 867.50 (as highligh
Shuttering for Diaphragm wall RC footing, at Zone 2K , Axis 02AH (as highlighted)
Steel Reinforcement for Diaphragm wall RC footing, at Zone 2K , Axis 02AH (as highlighted)
Surface preparation Prior to start backfilling under Strip footing (Inner), Up to bottom of strip footin
Level and Location for Retaining wall beside central bridge abutment, at Zone 4, Axis 01M (As Highlighte
Level and location for Energy Center Column ( C3 ) Zone 5A , Axis 2/H-I, 3/C-I , up to level 877.00 (As Hi
Shuttering and Concreting for Energy Center Column ( C3 ) Zone 5A , Axis 2/H-I, 3/C-I , up to level 877.0
Level and location for Energy Center Columns ( C2, C3, C5 ) Zone 5A , 9-10/D-H, Level from 877.00 to 88
Pipe Installation of Sub-Surface Drainage (Main Line & Branches) Perforated Pipes; (110 mmØ, UPVC
Shuttering and Concreting for Energy Center Columns ( C2, C3, C5 ) Zone 5A , 9-10/D-H, Level from 877.
Steel Reinforcement for Diaphragm wall at Zone 1C , Axis 01G , Level up to 872.50 (as highlighted)
Concreting for infill (perimeter) wall (outer) , at Zone 1P , Between Axis 01AP-01AQ , level upto 876.00
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 2) under Boulder No. WRB-40 (
Inspection for Installation of LV Line Pit - G/LV/23, G/LV/45, G/LV/64, G/LV/01, G/LV/02, G/LV/49 - as h
Inspection and Compaction test for backfilling Sub-grade 3rd Layer (3 of 4) near Line-Q - As Highlighted
Inspection of Excavation for Potable Water Line Including pit - H/PW/01, at Zone-H - as Highlighted
Inspection of Excavation for Fire Water Line Including Pit- H/F/11, H/F/10 at Zone-H - as highlighted
Surface Preparation prior to start backfilling for RO Water Line Isolation Pit for POC-06, POC-07 at Zo
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 3) for Heating and Chilled Water
Inspection of Thrust Block for RO Water Line inside Garden at Zone- B - As Highlighted
Inspection of backfilling Gravel 1st Layer (1 of 1) for LV Line Pit B/LV/45, B/LV/44, B/LV/28 at Zone- B -
Inspection for Installation of Slab for MV Line Pit - H/MV/30 at Zone-H - As Highlighted (SCR: KAIG3
Inspection and Compaction test for backfilling Sub-grade 1st & 2nd Layer (1,2 of 4) for LV Line Pit B/
Steel Reinforcements for Energy Center Columns , ( C2, C3, C4, C4*,C5), Axis 2/H-I , 3/C-G , 3/I , 4-6/A
Installation of straight PVC Conduit (Dia.25mm) & Boxes for Security (CAM) at Ground Floor in Site
Installation of straight PVC Conduit (Dia. 25mm) & Boxes for Voice and Data (CAM) at Ground Floor i
Installation of straight PVC Conduit (Dia. 25mm) & Boxes for Fire Alarm (Smoke Detector, Break Glass
Installation of PVC Conduit (Dia. 25mm) and Boxes for Voice & Data ( Telephone) at the Ground Floor
Installation of PVC Conduit (Dia. 25mm) and Boxes for Fire Alarm (Flashing Beacon) at Public Toilets i
Installation of PVC Conduit (Dia. 25mm) for Voice & Data (Floor Box for DATA & Telephone) at Ground
Pre insulated Heat& Chilled pipes, ( laying ,Aligment ,Leveling and fit up) Heat 200 mmØ. From
Installation of Potable Water Pipes (80mm Ø & 50mm Ø uPVC Class 5) at Zone B (Beside Aviary Garden
Installed Base Extrusion and Base Seal between Axis 01/AC - 01/AD.
Installed ETFE Cushions between axis 01-Z/01-AA (without aluminum caps) .
Installed ETFE Cushions between axis 01-Y/01-Z (without aluminum caps) .
Installed ETFE Cushions between axis 01-X/01-Y (without aluminum caps) .
Steel Reinforcement for perimeter wall (vertical) (inner) 1st stage, at Zone 1K, Axis 01AE-01AF (as highli
Protection layer of 4 mm thick Bituminous protection board For RC strip foundation (outer) at Zone 1J
Single layer of 4mm thick modified Bituminous WaterProofing membrane For RC strip foundation (outer
Surface Preparation and Primer coating For RC strip foundation (outer) at Zone 1J, Axis 01AA, 01AB, 01
Shuttering for infill (perimeter) wall (outer) , at Zone 1P , Between Axis 01AP-01AQ , level upto 876.00
Level and location for infill (perimeter) wall (outer) , at Zone 1P , Between Axis 01AP-01AQ , level upto
Protection layer of 4 mm thick Bituminous protection board for retaining block wall strip footing,
Two coats of Bituminous Damp Proof Coating for retaining block wall strip footing, at NORTH ADMIN
Surface Preparation and Primer coating For retaining block wall strip footing at NORTH ADMINSTATIO
Steel Reinforcement for wall (W7), at Zone 2Q, Axis 02AX (as highlighted)
Concreting for South Administration Building Walls (W16, W17, W20 ,W21) level from 868.10 to 872.35
Steel reinforcements for South Administration Building columns (C36, C37, C45), at Zone 2C, Axis 02J (As
Level and Location for Infill (Perimeter) Wall and Slab (Outer) (3rd Stage) at Zone 1L, Between Axis 0
Installation of straight UPVC Conduit (Dia. 160mm) Low Voltage Ductbank No. BB/D-LV/54 (B/LV/44 to
Installation of straight UPVC Conduit (Dia. 160mm) Low Voltage Ductbank No. GG/D-LV/37 (G/LV/29 t
Installation of PVC Conduit (Dia. 25mm) for Power System (Floor Box Socket Outlet) at First Floor i
Installation of UPVC Conduit (2x110mm) Low Current Ductbank (TELECOM) Manhole (L/TL/15 to L/TL/09
Installation of UPVC Conduit (2x110mm) Low Current Ductbank (Fire & Security) Manhole (L/FS/15 to
Installation of UPVC Conduit (2x110mm) Low Current Ductbank (TELECOM) Manhole (L/TL/51 to L/TL/46)
Installation of UPVC Conduit (2x110mm) Low Current Ductbank (Fire & Security) Manhole (L/FS/10 to L
Inspection & Compaction tests of 5th & 6th (Final) Layer (Sub Grade) Backfilling (upto top of kicker
Surface Preparation prior to Water Proofing for Slab top & Sides of Decant Sump-D1 at Boat garden,
Surface Preparation prior to Water Proofing for Slab top & Sides of Decant Sump-D3 at Mist garden,
Surface Preparation prior to Water Proofing for Slab top & Sides of Decant Sump-D4 Inside Water Pla
Protection Layer of 4 mm Thk. Bituminous Protection Board for External Surfaces of Wet Well F (All Si
Protection Layer of 4 mm Thk. Bituminous Protection Board for External Surfaces of Wet Well E (All Si
Installation of UPVC Conduit (2x110mm) Low Current Ductbank (Fire and Security) Manhole (C/FS/25 to
Installation of UPVC Conduit (4x110mm) Low Current Ductbank (TELECOM) Manhole (C/TL/24 to C/TL/38
Installation of UPVC Conduit (2x110mm) Low Current Ductbank (TELECOM) Manhole (L/TL/21 to L/TL/40
Installation of UPVC Conduit (4x110mm) Low Current Ductbank (TELECOM) Manhole (L/TL/31 to L/TL/46
Installation of UPVC Conduit (2x110mm) Low Current Ductbank (Fire & Security) Manhole (L/FS/15 to
Installation of Potable Water Pipes (160mm Ø uPVC Class 5) at Zone C&H.as per attached higlighted
Installation of Fire Water Pipes (250mm Ø uPVC Class 5) at Zone C&H. as per attached higlighted app
Inspection Of Pipe Installation Non-Potable Water Pipes (110mm Ø - uPVC Class 5) at Zone C&H (RED
' Installation of Storm Water Pipes Main Line (Corrugated pipes PP 600mm Ø) Including (MH-N-09,MH
'Bedding of Gravel 3/8" and Geotextile surrounding in Storm Water Pipes Main Line (Corrugated pi
Inspection and Compaction test for backfilling Sub-grade 12th, 13th Layer (12,13 of 15) in Wadi Garden
Inspection and Compaction test for backfilling Sub-grade 2nd Layer (2 of 4) near Line-Q - As Highlighted
Soil Preparation under Boulder No. WRB-38
Level and location for South Administration Building Walls (W16, W17, W20 ,W21) level from 868.10 to
Shuttering for South Administration Building Walls (W16, W17, W20 ,W21) level from 868.10 to 872.35 a
Inspection of Sand bedding for Fence CCTV Line between D/CCTV/27 & E/CCTV/09 - as highlighted (Sand
Inspection of Excavation for LV Line From B/LV/21 to B/LV/29 at Zone-B Including Pits - B/LV/33, B/LV/31
Inspection of Concrete (Plain) Pouring for the Duct Bank of MV Line from H/MV/05 to G/MV/33 at Zone
Inspection & Compaction tests of Single Layer (Sub-Base) Backfilling for Low Current Lines (MH/PG/LC/
Surface Preparation prior to start Water Proofing and Water Proofing for Duct Bank of MV Line from
Inspection of 1st Gravel layer Backfilling (50cm ht) for Sub Suface Lines for Palm Trees (110mm Pipes
Coordinates and Levels for Slab of Decant Sump-D1 at Boat garden, Inside Water Garden as highlig
Inspection and Compaction test for backfilling Sub-grade 2nd Layer (2of 2) above sand covering for Heat
Coordinates & Levels for Slab of Decant Sump-D4 Inside Water Play garden, at Water Garden as high
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 4) near Line-Q - As Highlighte
Inspection and Compaction test for backfilling Sub-grade 2nd&3rd Layer (2,3 of 4) for MV Line Pit E/
Coordinates & Levels for Roof Slab with Upstand, at Site Tower 4, as per the highlighted attached Dr
Steel Reinforcement for Wall of Boundary Wall (Remaining at Entrance), at Butterfly Garden, as highl
Concrete Pouring & Shuttering for Roof Slab with Upstand, at Site Tower 4, as per the highlighted at
Steel Reinforcement For Foundation of Internal Garden at grid 3-13, Along boundary wall Inside Aviar
Inspection of Installation of RO Water Line Isolation Pit for ROW-ISC-06, ROW-ISC-05, ROW-ISC-04, P
Inspection of Blinding Concrete under RO Water Line Isolation Pit for ROW-ISC-06, ROW-ISC-05, ROW-
Surface Preparation prior to start Water Proofing and Water Proofing for Duct Bank of MV Line from C
Inspection of Concrete (Plain) Pouring for the Duct Bank of MV Line from C/MV/29 to C/MV/30 at Zone-C
Inspection of Sand bedding under pipe for Fire & Security Distribution Line from H/FS/04 to H/FS/11 At
Inspection of Sand bedding under pipe for Telecommunication Line From H/TL/03 and H/TL/02 at Zone-H
Inspection of Sand bedding under pipe for Heating & Chilled Water Line at Zone-L - as highlighted (San
"Inspection and Compaction test for backfilling sub-grade 4th Layer (4 of 8) for Heating and Chilled wa
Inspection for Installation of Storm Line Manhole Cover for MH-O-10 and Gully cover for G-O-14 - as Hig
Inspection for Installation of Fire Water Line Pit Cover for C/F/17 at Zone-C - as highlighted
Installation of Potable Water Line Pit Cover for C/PW/06 at Zone-C - as highlighted
Inspection of Excavation for Heating & Chilled Water Line Washout H/WO/01, H/WO/02 at Zone-H - as h
Surface preparation prior to start waterproofing and Waterproofing for MV Line Pit D/MV/12 at Zone-D
Inspection of Sand Covering for protection of pipe for LV Line from L/LV/08 to M/LV/03 at Zone-L&M - a
Sand Covering Layer for Protection of Fire & Security Line from L/FS/22 to M/FS/05 at Zone-L&M as hig
Inspection of Sand Covering Layer for Protection of Telecommunications Line from L/TL/40 to M/TL/07
Inspection and Compaction test for backfilling Sub-grade 1st & 2nd Layer (1,2 of 2) for Duct bank of LV
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 2) for Car Parking Area CPG-2
Inspection and Compaction test for Laying of Sub-grade 1st Layer (1 of 2) for Embankment of Security
Inspection for Casting the Blinding Concrete under Beam of Seating Area 3-23 at Zone-K - As Highlighte
Inspection for Casting the Blinding Concrete under Beam of Seating Area 3-25 at Zone-K - As Highlighte
Installation of Conduit and Box for Lighting (G1,G1/CE,S12,LED 10) at the Crescent -2 Child Care Roof F
Installation of Conduit and Box for Lighting (C,C/CE,CV,CA,CB,CV/CE,D8-D,D-8/CE,A,Exit,SS,Sensor) at t
Installation of UPVC Conduit (2x110mm) Low Current Ductbank (Fire and Security) Manhole (C/FS/26 to
Installation of UPVC Conduit (2x110mm) Low Current Ductbank (Fire and Security) Manhole (C/FS/29 to
Installation of UPVC Conduit (4x110mm) Low Current Ductbank (TELECOM) Manhole (C/TL/25 to C/TL/37
Installation of UPVC Conduit (4x110mm) Low Current Ductbank (TELECOM) Manhole (C/TL/25 to C/TL/55
Installation of straight UPVC Conduit (Dia. 160mm) Low Voltage Ductbank No. CC/D-LV/26 (C/LV/15 to
Installation of straight UPVC Conduit (Dia. 160mm) Low Voltage Ductbank No. CC/D-LV/01 (C/LV/02 t
Installation of straight UPVC Conduit (Dia. 160mm) Low Voltage Ductbank No. GG/D-LV/16 (G/LV/34 t
Installation and Survey Report of Installed Anchor Bolts at Child Care , Zone 2N (As Highlighted)
Sand Bedding Below heat and chilled Water , Portable and Non Portable for Fire and Ro at Zone 2N , (
Surface Prepartion and Primer Coating on top of Mass Concrete Under Diaphragm Wall Foundation , at
Single Layer of 4mm thick Modified Bituminous WaterProofing Membrane on top of Mass Concrete Unde
Protection Layer of 4mm thhick Bituminous Protection Board on top of Mass Concrete Under Diaphragm
Protection Layer of Geotextile and Screed on top of Mass Concrete Under Diaphragm Wall Foundation ,
Protection Layer of 4mm thick Bituminous Protection Board for Retaining wall (wall and Foundation ) f
Protection Layer of Geotextile and Screed for Retaining wall (wall and Foundation ) from Axis 01S-01W ,
Inspection and Compaction test for 12th Layer of Backfilllng between duct tunnel Shaft of MCPE 1 and
Inspection and Compaction test for 9th layer of backfilling for MCPE 1 duct tunnel wall and Buttress (
Pre insulated Chilled pipes, ( laying ,Aligment ,Leveling and fit up) Chilled 65 mmØ. From point (E
Pre insulated Heat pipes, ( laying ,Aligment ,Leveling and fit up) Heat 150 mmØ. From point (E:6
Installation of Storm Water Pipes Main Line (uPVC Class 4 400mm Ø) Including (MH-J-01 , MH-J-02)& f
'Bedding of Gravel 3/8" and Geotextile surrounding in Storm Water Pipes Main Line (uPVC Class 4 400
Warning Tape Installation of Fire Fighting Networks for (200mmØ-UPVC-Class-5). As per highlighted
Warning Tape Installation of Fire Fighting Networks for (200mmØ-UPVC-Class-5). As per highlighted
'Fire Fighting Networks Sand Cover & Pipes Protection (30 cm above Pipes). As per highlighted Area
'Fire Fighting Networks Sand Cover & Pipes Protection (30 cm above Pipes). As per highlighted Area
'Warning Tape Installation of Potable Water Pipe for (110mmØ-UPVC-Class-5). As per highlighted Are
'Warning Tape Installation of Potable Water Pipe for (110mmØ-UPVC-Class-5). As per highlighted Are
Potable Water Pipes Sand Cover & Pipes Protection (30 cm above Pipes). As per highlighted Area in
Potable Water Pipes Sand Cover & Pipes Protection (30 cm above Pipes). As per highlighted Area in
Level and location for Diaphragm wall (wall), Zone 2C, Axis 02J, Level from 868.50 to 873.15 (as highligh
Shuttering for Diaphragm wall (wall), Zone 2C, Axis 02J, Level from 868.50 to 873.15 (as highlighted)
Level and location for Infill Perimeter wall (Outer ) at Zone 1L , Axis 01AI-01AJ , Level upto 874.30 (As H
Concreting for Infill Perimeter wall (Outer ) at Zone 1L , Axis 01AI-01AJ , Level upto 874.30 (As Highlight
Shuttering for Infill Perimeter wall (Outer ) at Zone 1L , Axis 01AI-01AJ , Level upto 874.30 (As Highlight
Concreting for Infill Wall Beam at Zone 2H, Axis 02AA , TOC 874.92 (as highlighted)
Shuttering for Infill Wall Beam at Zone 2H, Axis 02AA , TOC 874.92 (as highlighted)
Shuttering, Level and location & Concreting for Mass Concrete (2nd Layer) Under Diaphragm Wall RC Foo
Shuttering, Level and location & Concreting for Mass Concrete ( 3rd Layer ) Under Diaphragm Wall RC Fo
Steel Reinforcement for Diaphragm wall at Zone 1B , Axis 01F , Level from 872.5 to 877.00 (as highlight
Inspection of Formwork and Concrete Pouring for Wall (1st Part) of Sub-station - R2 at Zone-B - as highl
Inspection and Compaction test for backfilling Sub-grade 2nd, 3rd, 4th Layer (2,3,4 of 10) in Wadi Garde
Inspection and Compaction test for backfilling Sub-grade 5th & 6th Layer (5,6 of 6) around Manhole FW-
Level and Location for Blinding Under MCPE 2 Rc foundation, ZONE 2G , Axis 03W (as highlighted)
Installation of PVC Conduit (Dia. 25mm) and Boxes for Security (CAM) at the Infill wall Crescent - 1
Installation of PVC Conduit (Dia. 25mm) and Boxes for Voice and Data (CAM) at the Infill wall Cresce
Installation of PVC Conduit (Dia. 25mm) and Boxes for Fire Alarm (Flashing Beacon, Break glass, Fire
Sand Bedding for Irrigation Lateral Lines Inside Discovery Garden, as highlighted in the attached draw
Warning Tiles & Tape above Sand Cover for Low Current Lines (MH/PG/LC/19 to 20 to 22) Inside Physic
Plastering for Walls (All sides) of Toilets, at Grid (1-4/A-B), at Security & Fire Command Center, As H
Protection Layer of 4 mm Thk. Bituminous Protection Board for Foundation & Kicker of Cabin Room,
Inspection for Installation of Heating and Chilled water Line Pit H-DC-31, L-DC-16 - as highlighted.
Inspection and Compaction test for backfilling Sub-grade 1st and 2nd Layer (1,2 of 2) above Sand cover
Inspection and Compaction test for backfilling Sub-grade 11th Layer (11 of 15) in Wadi Garden (Crescent
Inspection and Compaction test for Backfilling Sub-grade 4th, 5th, 6th, 7th Layer (4,5,6,7 of 10) above
Inspection for backfilling Gravel 1st Layer (1 of 1) around LV Line Pit C/LV/17, C/LV/16, C/LV/11 at Zone-
Inspection for backfilling Gravel 1st Layer ( 1 of 3) around Manhole FW-A-3-6 - as Highlighted (Stock Pil
Inspection for Installation of Stone Cladding without Copping for Seating Area 3 - 21 at Zone-G (As Highl
' Installation of Storm Water Pipes Main Line (uPVC Class 4 315,400&450mm Ø) Including (MH-N-10-2
'Bedding of Gravel 3/8" and Geotextile surrounding in Storm Water Pipes Main Line (uPVC Class 4 3
Inspection Of Pipe Installation For Irrigation ROW Mainline (200mmØ- UPVC-Class-5 ); As per High l
Concreting for wall (W3, W15, W18, W19) level from 867.80 to 871.52, And wall (W5, W11, W12) level
Anti termite under blinding under diaphragm wall foundation at Zone 2K, Axis 02AH (As Highlighted)
Level and Location for South Tower Abutment Walls ,at Zone 7 , Grid 02/C , Level upto 864.30 (As Highl
Level and Location for Infill Wall ( Outer ) ( Inclined ) , between Axis 01AL-01AM, at Zone 1M , Level upt
Inspection and Compaction test for 1st , 2nd, 3rd and 4th Layer of ( SubGrade ) for Retainig Wall, Zone
Shuttering for South Tower Abutment Walls ,at Zone 7 , Grid 02C , (As Highlighted)
Surface Preparation and Primer Coating for Mass Concrete Under Diaphragm Wall ( Rc Footing and Strip f
Single Layer of 4mm thick Modified Bituminous WaterProofing Membrane for Mass Concrete Under Diaph
Steel Reinforcement for Cafeteria Columns ( C1,C2,C3,C4,C5,C6,C7,C8,C9 ) Zone 2A Axis 02A-02D , leve
Concreting for Infill Wall ( Outer ) ( Inclined ) , between Axis 01AL-01AM, at Zone 1M (as highlighted)
Shuttering for outer slopped wall, between Axis 01AL-01AM, at Zone 1M (as highlighted)
Steel Reinforcemnt for North Administration Building First floor Slab ,Zone 2Q , Axis Between 02AX- 02A
Concreting for South Tower Abutment Walls ,at Zone 7 , Grid 02/C , Level upto 864.30 (As Highlighted)
Steel Reinforcements for Energy Center Beam , Axis 6-7/A (As Highlighted) Level 875.35
Inspection and Compaction test for 9th Layer of Backfilllng between duct tunnel Shaft of MCPE 1 and B
Anti Termite Treatment prior Blinding under SOG, Inside Site Tower 4, as per the highlighted attache
Sand Cover & Protection for Low Current Lines (MH/PG/LC/19 to 20 to 22) Inside Physic Garden as hig
Inspection & Compaction tests of 2nd Layer (Sub-grade) Backfilling for Exposed Aggregate Paving Walk
Inspection for Installed Low Current Handholes of Fire Alarm & Security (MH/WG/FA/27, 28, 29, 30 &
Excavation & Bed preparation for Irrigation Lateral Lines Inside Discovery Garden, as highlighted in t
Inspection & Compaction tests of 4th, 5th & 6th (Final) Layer (Sub Grade) Backfilling (upto top of ki
' Warning Tape Installation of Storm Water Pipes Main Line (uPVC Class 4 400mm Ø) from (MH-N-12 t
' Gravel 3/8" Backfilling and Geotextile of Storm Water Pipes Main Line (uPVC Class 4 400mm Ø) fro
Level and Location for tunnel wall at MCPE 2, at Zone 2J, Axis 03L, level up to 874.50 (as highlighted)
Inspection & Compaction tests of 2nd, 3rd & 4th Layers (Sub Grade) Backfilling (Out of 6 layers) Sur
Concreting for tunnel wall at MCPE 2, at Zone 2J, Axis 03L, level up to 874.50 (as highlighted)
Shuttering for tunnel wall at MCPE 2, at Zone 2J, Axis 03L, level up to 874.50 (as highlighted)
Level and location for infill wall (stiffener) (outer) at Zone 1E, Axis 01M, level up to 869.00 (as highlighted
Concreting for infill wall (stiffener) (outer) at Zone 1E, Axis 01M, level up to 869.00 (as highlighted)
Shuttering for infill wall (stiffener) (outer) at Zone 1E, Axis 01M, level up to 869.00 (as highlighted)
Concreting for Diaphragm wall ( Wall ) , at Zone 1C , Axis 01G , level up to 870.10 (as highlighted)
Inspection & Compaction tests of 1st Layer (Sub Grade) Backfilling (Out of 6 layers) Surround Canopy
Surface preparation & Compaction tests of 1st Layer (Sub Grade) Existing Backfilling (Out of 6 layers
Surface preparation & Compaction tests of 3rd Layer (Sub Grade) Existing Backfilling (Out of 6 layers
Stack Boulders Installed Layers at levels +874.40, 874.80, 875.20, 875.60, 876.00, 876.40 876.80, 87
Concrete Pouring & Shuttering for Foundation & Kicker of Boundary Wall (Remaining at Entrance), at B
Coordinates & Levels for Foundation & Kicker of Boundary Wall (Remaining at Entrance), at Butterfly
Inspection of Thrust Block for UPVC Pipe (160 mm Dia) for Fire Water Line at Zone- B - As Highlighted
Soil Preparation under Boulder No. WRB-03 after Cutting
Surface Preparation prior to start Water Proofing and Water Proofing for Duct Bank of MV Line from C
Surface Preparation prior to start Water Proofing and Water Proofing for Duct Bank of MV Line fro
Inspection of Excavation for MV Line from G/MV/17 to G/MV/23 and G/MV/32 to G/MV/30 at Zone-G - a
Installation of Rock and Boulder No. WRB-19 - 2nd layer (2 of 3)
Installation of Rock and Boulder No. WRB-19 - 3rd layer (3 of 3)
Installation of Rock and Boulder No. WRB-60 - 1st layer (1of 2)
Installation of Rock and Boulder No. WRB-60 - 2nd layer (2of 2)
Installation of Rock and Boulder No. WRB-18 - 1st layer (1of 2)
Installation of Rock and Boulder No. WRB-18 - 2nd layer (2of 2)
Installation of straight UPVC Conduit (Dia. 160mm) Medium Voltage Ductbank no. GH/D-MV/01 (G/MV
Installation of PVC Conduit (Dia. 25mm) for Lighting (LED W17, W17/CE, W11, W11/CE) at the North Ad
Installation of PVC Conduit (Dia. 25mm) and Boxes for Security (Card Redaer, Break Glass for Emergen
Inspection of backfilling Gravel 1st Layer (1 of 1) between Telecom and Fire&Security Duct Bank at Zone-
Inspection for Laying of Warning tape above Sand covering for Heating and Chilled Water Line at Zone-B
Inspection for Casting the Blinding Concrete under the Storm Line Manhole MH-N-14, MH-N-13, MH-
Inspection for Installation of Slab for MV Line Pit - B/MV/11 at Zone-B - As Highlighted (SCR: KAIG3-SC
Excavation for Storm Water Line from Outfall -N to MH-N-04-1, At Zone-05 -Including manhole MH
Excavation and Soil Preparation under Boulder No. WRB-06
Inspection of Blinding Concrete under LV Line Pit - G/LV/49, G/LV/02, G/LV/01, G/LV/63, G/LV/64, G/LV/
Inspection of Excavation for Heating & Chilled Water Line at Zone-L - as highlighted
Soil Preparation under Boulder No. WRB-40
Soil Preparation under Boulder No. WRB-38
Inspection of Thrust Block for UPVC Pipe (200 mm Dia) for Fire Water Line at Zone- C&D - As Highligh
Single Layer of 4mm thick Modified Bituminous waterProofing Membrane for diaphragm wall Under Fou
Installation of Mechanical Pipe Sleeves (110&160mm Ø uPVC Class 4) at (North Administration) Cre
Inspection Of Pipe Installation Non-Potable Water Pipes (110mm Ø - uPVC Class 5) at Zone C&H as pe
Inspection Of Pipe Installation For Irrigation ROW Mainline (200mmØ- UPVC-Class-5 ); As per High l
Inspection Of Pipe Installation For Irrigation ROW Mainline (200mmØ- UPVC-Class-5 ); As per High l
'Warning Tape For For Irrigation ROW Sub-Mainline (110mm Ø, 63mm Ø, 50mm Ø) at Butterfly Garde
Installation of UPVC Conduit (2x75mm) Low Current Ductbank (TELECOM) and connection to Manhole
Steel Reinforcements for MCPE 2 wall of Duct Tunnel, axis 03I, 03M, 03N (as highlighted) Zone 2H,2K
Level and location for Energy Center Columns ( C2, C3, C5 ) Zone 5A, 9-10/D-H, Level upto 877.00 (As H
Shuttering and Concreting for Energy Center Columns ( C2, C3, C5 ) Zone 5A , 9-10/D-H, Level upto 877.
Level and location for Child Care roof slab, Zone 2N, Axis 02AR-02AT (As Highlighted) Level up to 875.52
Steel Reinforcement for Child Care roof slab, Zone 2N, Axis 02AR-02AT (As Highlighted)
Installation of straight UPVC Conduit (Dia. 160mm) Low Voltage Ductbank no. CC/D-LV/16 (C/LV/12 to
Concrete Pouring for Blinding under Electrical Handholes of Low Voltage (MH/WG/LV/13), Inside wate
Excavation and Blinding Levels for Electrical Handholes of Low Voltage (MH/WG/LV/13), Inside water
Inspection and Compaction test for Laying of Sub-grade 1st Layer (1 of 2) for Embankment of Security
Surface Preparation prior to start backfilling between Telecom and Fire&Security Duct Bank at Zone-G -
Inspection of Sand covering for protection of pipe for Heating and Chilled Water Line at Zone-H - As hi
Inspection and Compaction Test for backfilling Sub-grade 1st & 2nd Layer (1,2 of 4) above Sand coverin
Surface Preparation prior to start backfilling for LV Line Pit C/LV/17, C/LV/16, C/LV/11 at Zone- C (As Hig
"Inpection of Casting Concrete for Short Piece & Surface Preperation prior to start waterproofing a
Inspection of Concrete Pouring for Wall of MV Line Pulling Pit - D/MV/12 at Zone-D (As Highlighted)
"Inspection of Thrust Block for Potable Water Line ( Dia 110mm) at Zone-C&D - As Highlighted (SCR-
Inspection and Compaction test for backfilling sub-grade 1st & 2nd Layer (1,2 of 4) for Storm Water L
Inspection of Sand bedding under pipe for LV Line between B/LV/22 and B/LV/21 at Zone-B - as highligh
Inspection and Compaction test for backfilling Sub-grade 1st & 2nd Layer (1,2 of 4) for MV Line Pit E
Inspection of Formwork and Concrete Pouring for Footing of MV Line Pulling Pit - B/MV/11 at Zone-B (As
Inspection for Existing NGL under the temporary access Road in Crescent Garden Wadi Area - As per th
Inspection for Installation of Heating and Chilled water Line Pit- G/DH/14, G/DH/17, C/DC/01.- as highli
Excavation for Telecommunication Line From H/TL/03 and H/TL/02 at Zone-H Including Pit H/TL/03, H/
Excavation for Low Current Lines of (MH/PG/LC/01 to Plant room and Boundary wall), at Physic Garden
Excavation for Fire & Security Distribution Line from H/FS/04 to H/FS/11 At Zone-H Including Pit H/FS
Surface Preparation Prior to Start Backfilling around Manhole FW-A-3-6, - as Highlighted
Inspection of Concrete (Plain) Pouring for the Duct Bank of MV Line from C/MV/16 to C/MV/43 at Zone-
Inspection of Concrete (Plain) Pouring for the Duct Bank of MV Line from C/MV/11 to D/MV/18 And F
Surface Preparation prior to start Water Proofing and Water Proofing for Duct bank of LV line from C/L
Inspection of Sand bedding under pipe for LV Line From G/LV/49 To G/LV/23 at Zone-G Including Branch
Excavation for fence cctv line between D/CCTV/27 & E/CCTV/09 - Including CCTV Pit E/CCTV/09, E/CC
Inspection for Installation of Stone Cladding without Copping for Seating Area 3 - 38 at Zone-L (As Highl
Excavation for Electrical Lines of Emergency (MH/PG/EM/01 to Plant room and Boundary wall) and Lo
Stack Boulders Installed Layers at levels +874.80, 875.20, 875.60, 876.00, 876.40, 877.20, 877.60, 8
Gravel (Drainage) & Geo Textile (Filter membrane Terrain) for Landscaping and Plantation area's, S
1st Coat Cementitious Water proofing for Wall & Kicker top of Cabin Room, ETFE & Water feature Pum
Steel Reinforcement For Walls of Internal Garden (1 no's at section 06), Inside Aviary Garden, As per
2nd Coat Damp proofing for Foundation & Kicker of Cabin Room, ETFE & Water feature Pump Rooms & R
1st Coat Damp proofing for Foundation & Kicker of Cabin Room, ETFE & Water feature Pump Rooms & R
Primer Prior to Damp proofing for Foundation & Kicker of Cabin Room, ETFE & Water feature Pump Ro
Concrete Pouring & Shuttering for Wall of Wet Well Beside Water Feature, at Management and Ma
Steel Reinforcement for infill (perimeter) wall and Slab (outer) 3rd stage, at Zone 1L , Between Axis 01
Installation of Potable Water Line Pit C/PW/03 at Zone-C - as highlighted
Surface Preparation prior to start Concrete pouring for Fire & Security Distribution Line from B/FS/16 t
Excavation and Soil Preparation under Boulder No. WRB-05
Excavation and Soil Preparation under Boulder No. WRB-04
Installed Base Extrusion and Base Seal between Axis 01/AB - 01/AC.
Shuttering for North Administration Building Ground Floor Slab and Stair 2 ,at Zone 2R ,Axis 02BA-02BC (
Installed Aluminum Extrusion and Base Seal between Axis 01/AA - 01/AB.
Installed Aluminum Extrusion and Base Seal between Axis 01/Z - 01/ZZ.
Concreting for MCPE 1 Duct Tunnel Wall , ZONE 2M 2N , Axis 03/R (as highlighted)
Shuttering for MCPE 1 Wall , ZONE 2M 2N , Axis 03/R (as highlighted)
Installed Aluminum Extrusion and Base Seal between Axis 01/Y - 01/Z.
Level and Location for wall (W3, W15, W18, W19) level from 867.80 to 871.52, And wall (W5, W11, W1
Steel Reinforcements for wall (W18, W19) at SOUTH ADMIN BUILDING, Zone 2C, Axis between 02H-02G (a
Shuttering for wall (W3, W15, W18, W19) level from 867.80 to 871.52, And wall (W5, W11, W12) level
Installed ETFE Cushions between axis 01-U/01-V (without aluminum caps) .
Level and location for Footing and Grade Beam at Energy Center , Axis 19-23/N-O, 22-23/O-P, 19-23/P-Q
Installed ETFE Cushions between axis 01-T/01-U (without aluminum caps) .
Installed ETFE Cushions between axis 01-S/01-T (without aluminum caps) .
Shuttering and Concreting for Footing and Grade Beam at Energy Center , Axis 19-23/N-O, 22-23/O-P, 1
Steel Reinforcement for Footing and Grade Beam at Energy Center , Axis 19-23/N-O, 22-23/O-P, 19-23/
Level and location for plain concrete under diaphragm wall foundation at Zone 1L, Axis 01AG, level up t
Level and location for plain concrete under diaphragm wall foundation at Zone 1K, Axis 01AF, lavel up to
Concreting of plain concrete under diaphragm wall foundation at Zone 1L, Axis 01AG (as highlighted)
Shuttering for plain concrete under diaphragm wall foundation at Zone 1L, Axis 01AG (as highlighted)
Anti termite under blinding under diaphragm wall foundation at Zone 1L, Axis 01AG (As Highlighted)
Concreting of plain concrete under diaphragm wall foundation at Zone 1K, Axis 01AF (as highlighted)
Shuttering for plain concrete under diaphragm wall foundation at Zone 1K, Axis 01AF (as highlighted)
Pre insulated Chilled pipes, ( laying ,Aligment ,Leveling and fit up) Chilled 150mmØ. from point
Pre insulated Heat pipes, ( laying ,Aligment ,Leveling and fit up) Heat 200mmØ. from point (E:6
Anti termite under blinding under diaphragm wall foundation at Zone 1K, Axis 01AF (As Highlighted)
Level and Location for Diaphragm wall ( Wall ) , at Zone 1C , Axis 01G , Level upto 869.35 , 869.55 , 869.
Steel Reinforcement for North Administration Building Ground Floor Slab and Stair 2 ,at Zone 2R ,Axis 0
Inspection of Excavation and Surface Preparation for Heat and Chilled water Line Pit L/DC/09, L/DC/10 a
Inspection and Compaction test for backfilling sub-grade 1st Layer (1 of 1) for Storm Water Line from
Inspection and Compaction test for backfilling Sub-grade 2nd Layer ( 2 of 5) around Manhole FW-A-3-5 -
Inspection of Sand covering for protection of pipe for Heating and Chilled Water Line at Zone-H - As hi
Inspection of Sand covering for protection of pipe for Heating and Chilled Water Line at Zone-B - As hig
Inspection of Blinding Concrete under Sub-station - R7 and R11 at Zone-D&L - as highlighted
Inspection for Installation of LV Line Pit - C/LV/02, B/LV/27, B/LV/26, B/LV/44 - as highlighted
Inspection for Installation of Heating and Chilled water Line Pit L-DC-10, L-DC-09, L-DC-08, L-DC-07
Inspection for Installation of Fire Water Line Pit - C/F/14, H/F/01 at Zone-C&H - as highlighted
Surface Preparation prior to start backfilling for LV Line Pit B/LV/45, B/LV/44, B/LV/28 at Zone- B (As Hi
Inspection for Cut and Removal of Old utilities from Phase-2 and Surface preparation prior to start backf
Surface Preparation prior to start Concrete pouring for Telecommunication Line From B/TL/17 to B/TL/1
Inspection of Excavation for LV Line From G/LV/49 To G/LV/23 at Zone-G Including Branch and Pits -G/
Concreting for Blinding Under Diaphragm Wall Foundation at Zone 2M ,Grid 02/AL (as highlighted)
Installation of Potable Water Pipes (110mm Ø uPVC Class 5) at Zone C as per attached higlighted app
Installation of Fire Water Pipes (200mm Ø uPVC Class 5) at Zone C as per attached higlighted approv
Installation of Potable Water Pipes (110mm Ø uPVC Class 5) at Zone D as per attached higlighted ap
Installation of Fire Water Pipes (200mm Ø uPVC Class 5) at Zone D as per attached higlighted approve
Inspection of Sand bedding under pipe for Telecommunication Line From C/TL/25 to C/TL/50 at Zone-C -
Coordinates and Levels for Slab of Decant Sump-D3 at Mist Garden, inside Water Garden as highligh
Coordinates and Levels for Slab of Decant Sump-D1 at Boat garden, Inside Water Garden as highlig
Coordinates & Levels for Slab of Decant Sump-D4 Inside Water Play garden, at Water Garden as highli
Inspection for Installed Low Current Handhole (MH/PG/LC/20 & 22) Inside Physic Garden as highlighte
Inspection & Compaction tests of 1st Layer (Sub-grade) Backfilling for Exposed Aggregate Paving Walk
Inspection of 2nd Gravel layer Backfilling (50cm ht) for sub surface drainage pipes (for trees) Surrou
Concrete Pouring and Shuttering for Slab of Decant Sump-D3 at Mist Garden, inside Water Garden as
Installation of PVC Conduit (Dia. 25mm) & Boxes for Power System (Power outlets) at Ground Floor Fi
Steel Reinforcement for Slab of Decant Sump-D3 at Mist Garden, inside Water Garden as highlighted
Concrete Pouring & Shuttering for Slab of Decant Sump-D1 at Boat garden, Inside Water Garden as
Steel Reinforcement for Slab of Decant Sump-D1 at Boat garden, Inside Water Garden as highlighte
Installation of straight PVC Conduit (Dia.25mm) for Security (CAM) at Roof Floor Site Tower No. 4 as
Concrete Pouring and Shuttering for Slab of Decant Sump-D4 Inside Water Play garden, at Water Garde
Installation of straight PVC Conduit (Dia. 25mm) for Fire Alarm (Smoke Detector ,Speaker , Mounted
Installation of straight PVC Conduit (Dia.25mm) for Voice and Data (CAM) at Roof Floor Site Tower N
Steel Reinforcement for Slab of Decant Sump-D4 Inside Water Play garden, at Water Garden as highlig
Block work from Lintel upto final Height for all walls at Ground Floor, Inside Site Tower 5, as per the
1st Layer Gabions Layout Installation along Boundary wall Inner side, (Between F.O.H and B.O.H and P
Gravel (Drainage) & Geo Textile (Filter membrane Terrain) for Plantation area's along Boundary wall (I
Installation of Sub-Surface Drainage Pipes (Perforated 110mm Ø uPVC Class 4) at Water Garden as p
Level and Location for South Administration Building Columns and Walls , ( Columns ( C43 , C44 , C50 ( L
Installation of Trees Sub-Surface Drainage Pipes (Perforated 110 mm Ø uPVC Class 4 ) at Physic Gard
'Bedding of Gravel 3/8" and Geotextile Surrounding Trees Sub-Surface Drainage Pipes (Perforated 11
Shuttering for South Administration Building Columns and Walls , ( Columns ( C43 , C44 , C50 ( Level Fr
Filed joint jacketing for Pre insulated Chilled pipes 400mmØ.from point (E:648047.675 N:2713797.2
Installation of UPVC Conduits (Dia. 75mm) for Low Current (Fiber Optic Cables) in Ground Floor at t
Installation of Straight PVC Conduit (Dia. 25mm) and Boxes for Fire Alarm (Speaker) at Ground Floor
Inspection and Compaction Test for Backfilling Sub-Base Between Boulder lines at Top Left side of Ge
Inspection & Compaction tests of 1st Layer (Sub-grade) Backfilling for Plantation areas inside Plante
Inspection and Compaction Test for Backfilling Sub-Base Between 2nd & 3rd line of boulders at Right
Inspection for 2nd Coat Epoxy (Nitocote EP405), for All Inner Surfaces of tank Wet Well E, Inside Wat
Inspection for 2nd Coat Epoxy (Nitocote EP405), for Inner Surfaces of tank of Wet Well F, Inside Wate
Surface Preparation prior to Epoxy Coating (Nitomortar TC2000), for All Inner Surface of Plant room o
Surface Preparation and Primer coating prior to Damp Proofing for Footing & Wall of Seat Wall (Inner)
Concrete Pouring for Blinding under Stone Steps of Stairs (Outer 3 no's), inside Physic Garden, as high
Concrete Pouring for Blinding under SOG, Inside Site Tower 4, as per the highlighted attached Drawin
Inspection for Levels of Blinding under SOG, Inside Site Tower 4, as per the highlighted attached Draw
Installation of PVC Conduit (Dia. 25mm) for Lighting (LED F1/CE) at the Promenade & Canopies Cresce
Installation of Straight PVC Conduit (Dia. 25mm) and Boxes for Fire Alarm (Speaker) in the Promenad
Installation of Straight PVC Conduit (Dia. 25mm) and Boxes for Fire Alarm (Speaker) at Ground Floor
Installation of PVC Conduit (Dia. 25mm) and Boxes for Voice & Data (DATA & Telephone) at Ground Fl
Installation of PVC Conduit (Dia. 25mm) and Boxes for Fire Alarm (Flashing Beacon, Break glass) at G
Level and Location for North Administration Building Ground Floor Slab and Stair 2 ,at Zone 2R ,Axis 0
Level and Location for Perimeter Wall ( Outer Sloped ) , at Zone 1M , Axis 01AK-01AL , Level upto 873.8
Level and Location for Mass Concrete Under Diaphragm Wall Foundation ZONE 1L, Axis 01AG , TOC 866.
Steel Reinforcement for Infill wall ( Vertical ) ( Outer ) at Zone 1F , Axis 01Q-01R( As Highlighted)
Concreting for Perimeter Wall ( Outer Sloped ) , at zone 1M , Axis 01AK-01AL , Level upto 874.50 ( As i
Shuttering for Perimeter Wall ( Outer Sloped ) , at zone 1M , Axis 01AK-01AL , Level upto 874.50 ( As ig
Concreting for Blinding under Strip Footing around soakaway,at North Admin Building at Zone 2R, Axis
Shuttering for Blinding under Strip Footing around soakaway,at North Admin Building at Zone 2R, Axis
Antitermite Under Blinding under Strip Footing around soakaway,at North Admin Building at Zone 2R, A
Level and location for Mass Concrete ( 1st Layer ) Under Foundation of Diaphragam Wall , Zone 2K , Axi
Level and location for diaphragm wall, at Zone 1E, Axis 01M, level from 869.00 to 873.00 (as highlighted
Level and location for diaphragm wall RC footing at Zone 2K, Axis 02AH (as highlighted) Level from 866
Cconcreting for Mass Concrete ( 1st Layer ) Under Foundation of Diaphragam Wall , Zone 2K , Axis 02/AH
Shuttering for Mass Concrete ( 1st Layer ) Under Foundation of Diaphragam Wall , Zone 2K , Axis 02/AH
Concreting for diaphragm wall, at Zone 1E, Axis 01M, level from 869.00 to 873.00 (as highlighted)
Shuttering for diaphragm wall, at Zone 1E, Axis 01M, level from 869.00 to 873.00 (as highlighted)
Steel Reinforcements for infill wall at Zone 1E, Axis 01M, level up to 869.00 (as highlighted)
Concreting for diaphragm wall RC footing at Zone 2K, Axis 02AH (as highlighted)
Shuttering for diaphragm wall RC footing at Zone 2K, Axis 02AH (as highlighted)
Steel Reinforcements for diaphragm wall RC footing at Zone 2K, Axis 02AH (as highlighted)
Inspection and compaction test for (1st, 2nd, 3rd, 4th) layers for strip footing and infill wall, at Zone 1D
Inspection and compaction test for (5th, 6th, 7th, 8th) layers under foundation at cenozoic garden, at Zo
Level and Location for Mass Concrete ( 2nd Layer ) Under Diaphragm Wall RC Footing ,at Zone 2K , Axi
Level and Location for Mass Concrete ( 3rd Layer ) Under Diaphragm Wall RC Footing ,at Zone 2K , Axi
Shuttering and Concreting for Energy Center Columns ( C3 , C4 ) Zone 5A , Axis 1/C-I , 2/C-G , 13-14/D-
Installation of Mechanical Pipe Sleeves uPVC Class-4, 75mm Ø at Crescent 2 South Administration Z
Inspection and Compaction test of 1st , 2nd , 3rd and 4th Layer of Backfilling under Foundation ( Inner
Filed joint jacketing for Pre-insulated Chilled Water Pipes (dia 65mmØ) From point (E:647544.383
Filed joint jacketing for Pre insulated Chilled Water pipes, (100 mmØ) ( laying ,Aligment ,Leveling
Pre insulated Chilled pipes, ( laying ,Aligment ,Leveling and fit up) Chilled 200mmØ. From point (E
Steel Reinforcements for outer slopped wall, between Axis 01AL-01AM, at Zone 1M (as highlighted)
Steel Reimnforcement for South Administration BuildingWlls ( ( W3 , W5 , W11 , W12 , W15 ) Level Fro
Inspection of Concrete (Plain) Pouring for the Duct Bank of LV Line from C/LV/17 to C/LV/11 at Zone-C (
Installation of Non-Potable Water Pipes (63mm Ø - uPVC Class 5) at Zone B as per highlighted Red Li
' Installation of Storm Water Catch Basin Pipes (uPVC Class 4 315mm Ø) from CB(G-F-02, G-F-04, G-F-0
Installation of Mechanical Pipe Sleeves uPVC Class-4 (315mm Ø for RW, 160mm Ø for VP & CDP) at C
Inspection of Top levels for Stone Coping on Walls of Outer Canopy 3 to Close the Site Instruction K
Surface preparation prior to Backfilling Surround New Ticketing Booths 6A & 7A & Conopy foundations a
Inspection of Steel Reinforcement for Slab of MV Line Pulling Pit - H/MV/19, L/MV/01, L/MV/11, L/MV/
Inspection of Formwork & Concrete Pouring for Slab of MV Line Pulling Pit - H/MV/19, L/MV/01, L/MV/
Installation of Rock and Boulder No. WRB-47 - 5th layer (5 of 5) - As Highlighted
Installation of Rock and Boulder No. WRB-47 - 4TH layer (4 of 5) - As Highlighted
Installation of Rock and Boulder No. WRB-47 - 3Rd layer (3 of 5) - As Highlighted
Installation of PVC Conduit (Dia. 25mm) For Voice & Data (DATA & Telephone) at Ground Floor North
"Inspection of Sand bedding under pipe for Fire & Security Distribution Line at Zone-C - as highlighted (
Inspection of Sand bedding under pipe for Telecommunication Line at Zone-C - as highlighted (Sand fro
Inspection of Excavation for Heating & Chilled Water Line Branch at Zone-L - as highlighted
Level and Location for diaphragm wall, Zone 2M, grid 02AL, level from 873.50 to 877.00 (As Highlighted
Inspection and Compaction test for backfilling Sub-grade 9th, 10th & 11th Layer (9,10,11 of 15) in Wadi
Concreting for diaphragm wall, Zone 2M, grid 02AL, level from 873.50 to 877.00 (As Highlighted)
Installation of straight PVC Conduit (Dia. 25mm) & Boxes for Power System (Power outlets) at Ground
Shuttering for diaphragm wall, Zone 2M, grid 02AL, level from 873.50 to 877.00 (As Highlighted)
Inspection of Excavation for LV Line between B/LV/22 and B/LV/21 at Zone-B Including Pits - B/LV/43, B/
Concreting for Blinding Under MCPE 2 Rc foundation, ZONE 2G , Axis 03W (as highlighted)
Inspection of Sand bedding under pipe for LV Line From C/LV/02 to C/LV/03 at Zone-C - as highlighted (
Shuttering for Blinding Under MCPE 2 Rc foundation, ZONE 2G , Axis 03W (as highlighted)
Antitermite under Blinding Under MCPE 2 Rc foundation, ZONE 2G , Axis 03W (as highlighted)
Excavation for Storm Water Line from MH-N-09 to MH-N-04 at Zone-05 Including Manholes MH-N-09,
Installation of straight UPVC Conduit (Dia. 160mm) Low Voltage Ductbank No. LL/D-LV/12 (L/LV/02 to
Steel Reinforcement for Energy Center Columns , Axis 9-10/D-H, at Level 880.20 ( upto Bottom of Beam
Inspection of Sand covering for protection of pipe for Heating and Chilled Water Line at Zone-H - As hi
Installation of straight UPVC Conduit (Dia. 160mm) Low Voltage Ductbank No. LL/D-LV/06 (L/LV/10 to
Inspection for Installation of LV Line Pit - C/LV/17, C/LV/16, C/LV/11, C/LV/06, C/LV/08, C/LV/28, B/LV
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 1) above Red Tiles for LV Line
Shuttering for Diaphragm wall ( Wall ) , at Zone 1C , Axis 01G , (as highlighted)
Inspection for Laying of Red Tiles and Warning Tape above Sand Covering for LV Line from B/LV/24 to B/
Inspection and Compcation test for 1st and 2nd Layer for Below hot and chilled Water Pipe Lines , Po
Suface Preparation Prior to start Backfilling for Strip footing and infill Wll , Zone 1D , Between Axis 01J-
Inspection and Compaction test for backfilling Sub-grade 1st & 2nd Layer (1,2 of 2) around Concrete en
Suface Preparation Prior to start Backfilling under Foundation and Slab on Grade ( SOG ) ,at Cenozoic
Surface Preperation prior to start backfilling around Concrete encasement for branch of Line-G - as high
Installation of Non-Potable Water Main Line Pipes (200mm Ø, 160mm Ø, 50mm Ø - uPVC Class 5) as
Surface Preparation Prior to Plastering for Walls Inside Water feature Pump room, Cabin Room & E
Inspection and Compaction test for Backfilling Sub-grade 1st, 2nd, 3rd, 4th Layer (1,2,3,4, of 10) abov
Excavation for Storm Water Line from MH-J-04 to Outfall-J at Zone-07 Including Manhole MH-J-04, MH-J
steel Reinfocement for Diaphragm Wall ( Wall ) at Zone 2M , Grid 0/AL , Level Upto 873.50 ( As Highli
Installation of straight UPVC Conduit (Dia. 160mm) Medium Voltage Ductbank no. CC/D-MV/20 (C/M
Installation of PVC Conduit (Dia. 25mm) & Box for Lighting Fixture (Preesence Detector) at Undercroft
Installation of straight UPVC Conduit (Dia. 160mm) Medium Voltage Ductbank no. CD/D-MV/03 (C/MV/
Installation of straight UPVC Conduit (Dia. 160mm) Low Voltage Ductbank No. LL/D-LV/16 (L/LV/11 to
Installation of Straight PVC Conduit (Dia. 25mm) and Boxes for Security System (CAM) at the Cafeteri
Installation of Straight PVC Conduit (Dia. 25mm) and Boxes for Voice & Data System (WIFI, DATA & Te
Installation of Straight PVC Conduit (Dia. 25mm) and Boxes for Fire Alarm System (Break Glass, Smok
3rd Coat of Cementitous water proof Coating prior Stone Cladding for Infill wall ( Inner ) ( Outer Side ) ,
3rd Coat of Cementitous Water Proof Coating Prior Stone Cladding for Infill wall ( Inner ) ( Outer Side )
3rd Coat of Cementitous Water Proof Coating Prior Stone Cladding for Infill wall ( Inner ) ( Outer Side ) ,
Shuttering for Mass Concrete ( 3rd Layer ) Under Diaphragm Wall RC Footing ,at Zone 2K , Axis 02/AH
Concreting for Mass Concrete ( 2nd Layer ) Under Diaphragm Wall RC Footing ,at Zone 2K , Axis 02/AH
Shuttering for Mass Concrete ( 2nd Layer ) Under Diaphragm Wall RC Footing ,at Zone 2K , Axis 02/AH
Concreting for Mass Concrete Under Diaphragm Wall Foundation ZONE 1L, Axis 01AG , TOC 866.430 (as
Antitermite Under Mass Concrete Under Diaphragm Wall Foundation ZONE 1L, Axis 01AG (as highlighte
Shuttering for Mass Concrete Under Diaphragm Wall Foundation ZONE 1L, Axis 01AG , TOC 866.430 & 86
Concreting for Mass Concrete ( 3rd Layer ) Under Diaphragm Wall RC Footing ,at Zone 2K , Axis 02/AH
Installed Aluminum Extrusion and Base Seal between Axis 01/W - 01/X.
Installed Aluminum Extrusion and Base Seal between Axis 01/X - 01/Y.
Installed Aluminum Caps between Axis 02/Z - 02/AA.
Installed Aluminum Caps between Axis 02/Y - 02/Z.
Installed ETFE Cushions between axis 01-P/01-Q (without aluminum caps) .
Installed ETFE Cushions between axis 01-Q/01-R (without aluminum caps) .
Installed ETFE Cushions between Axis 01/R - 01/S (without Aluminum Caps).
Installed Aluminum Extrusion and Base Seal between Axis 01/U - 01/V.
Installed Aluminum Extrusion and Base Seal between Axis 01/V - 01/W.
Gravel (Drainage) & Geo Textile (Filter membrane Terrain) for Tree Pits (47 no's) Surround Boat Ga
Gravel (Drainage) & Geo Textile (Filter membrane Terrain) for Landscaping and Plantation Area's Su
Installation of Rock and Boulder No. WRB-19 - 1st layer (1 of 3)
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 2) around Manholes -
Excavation for Storm Water Line from G-N-03 to MH-N-10-1 at Zone-05 Including branch, Manhole MH-N
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 1) above sand covering for Hea
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 1) above GreenTiles for Fire &
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 1) above Green Tiles for Tel
Inspection for Backfilling Gravel 1st Layer (1 of 1) around Manhole FW-A-4 - as Highlighted (Stock Pile#
Excavation and Surface Preparation for Storm Water Line branches including Gullies G-F-04, G-F-05, G-F-
Inspection of Sand bedding under pipe for Heating & Chilled Water Line at Zone-H&L - as highlighted (S
Surface Preparation prior to start backfilling for MV Line Pit E/MV/08, E/MV/09, E/MV/06, E/MV/10 at Z
Inspection of Excavation and Surface Preparation for Heating & Chilled Water Line at Zone-G - as highlig
Installation of Irrigation ROW Mainline (110mm Ø uPVC Class 5) as per Highlighted Attached Approv
Steel Reinforcement for Foundation and Kicker of Boundary Wall (Remaining at Entrance), at Butterfly
2nd Coat Damp Proofing for Footing & Wall of Seat Wall (Inner) (Remaining Right Side) All sides, Insid
1st Coat Damp Proofing for Footing & Wall of Seat Wall (Inner) (Remaining Right Side) All sides, Insid
Concrete Pouring & Shuttering for Wall of Seat Wall (Inner) Left Side (Remaining part), Inside Physic
Concrete Pouring & Shuttering for Foundation of Dinosaur inside Discovery Garden, as highlighted in
Surface Preparation Prior to Plastering for Walls Inside Water feature Pump room, Cabin Room & E
Surface Preparation Prior to Stone Cladding for Walls of Water feature Pump room, Cabin Room, ETFE
Inspection of 1st Gravel layer Backfilling (50cm ht) for sub surface drainage pipes (for trees) Surrou
Inspection & Compaction tests of Sand Filled prior to Blinding of SOG, Inside Site Tower 4, as per th
Installation of PVC Conduit (Dia. 25mm) and Boxes for Voice & Data (DATA & Data for TV) at Ground F
Level and Location for MCPE 2 Bottom Slab of Duct Tunnel, Axis 03I, 03M, 03N (as highlighted) Zone 2H,
Concreting for Central Bridge Deck , at Zone 4 , Level upto 870.13 and 870.22 (As Highlighted)
Shuttering for Central Bridge Deck , at Zone 4 , Level upto 870.13 and 870.22 (As Highlighted)
Concreting for MCPE 2 Bottom Slab of Duct Tunnel, Axis 03I, 03M, 03N (as highlighted) Zone 2H,2K, Leve
Shuttering for MCPE 2 Bottom Slab of Duct Tunnel, Axis 03I, 03M, 03N (as highlighted) Zone 2H,2K, Leve
Steel Reinforcements for MCPE 2 Bottom Slab of Duct Tunnel, axis 03I, 03M, 03N (as highlighted) Zone
Level and Location for Energy Center Columns ( C3 and C4 ) , Zone 5A , Axis 1/C-I , 2/C-G , 13-14/D-H ,
Level and Location for Infill wall ( Stiffner ) ( Inner ) at Zone 1E , Axis 01/M , Level upto 869.00 (As Highl
Concreting for Infill wall ( Stiffner ) ( Inner ) at Zone 1E , Axis 01/M , Level upto 869.00 (As Highlighted)
Shuttering for Infill wall ( Stiffner ) ( Inner ) at Zone 1E , Axis 01/M , Level upto 869.00 (As Highlighted)
Filed joint jacketing for Chilled 100mmØ from point (E:648091.283 N:2714198.217) to (E:648090.19
Steel Reinforcement for Infill wall ( Stiffner ) ( Inner ) at Zone 1E , Axis 01/M , Level upto 869.00 (As Hig
Steel Reinforcements for Diaphragm wall (wall) Zone 2C Axis 02J (as highlighted)
Concreting for Plain Concrete Under Diaphragm Wall foundation , Zone 1K , Grid 01/AF , Level upto 866
Concreting for Infill wall (inner) at Zone 1A at Axis 01A-01B-01C-01D (As Highlighted) level upto 872.00
Surface Preparation Prior to Start Backfilling for Diaphragm Wall Foundation ( Side ) , Zone 1D, Grid 01/
2nd coat of Cementitous water proof Coating prior Stone Cladding for Infill wall ( Inner ) ( Outer Side ) ,
2nd coat of Cementitous Water Proof Coating Prior Stone Cladding for Infill wall ( Inner ) ( Outer Side )
2nd coat of Cementitous Water Proof Coating Prior Stone Cladding for Infill wall ( Inner ) ( Outer Side ) ,
Excavation and Bed Preparation Prior to start Backfilling under Foundation ( Inner ) ,at Cenozoic Garde
Level and Location for Cafeteria Walls ( W4 ( Level From 867.87 to 869.10 ) & W5 ( 866.74 to 868.75 ))
Level and Location for Cafeteria Ground Floor Slab , at ZONE 2A , Axis 02A to 02D , Level 868.95 & 869.
Shuttering for Cafeteria Walls ( W4 ( Level From 867.87 to 869.10 ) & W5 ( 866.74 to 868.75 )) , at Zon
Shuttering for Cafeteria Ground Floor Slab , at ZONE 2A , Axis 02A to 02D , Level 868.95 & 869.10 (as h
Concrete Pouring & Shuttering for Parapet walls on Roof Slab and Stairs at Site Tower 5, as per the h
Installation of stub-up and Direct Buried strainght Upvc Conduit (dia.32mm) for Ligthing (W6,V2,B2&B2
Coordinates & Levels of Parapet walls on Roof Slab and Stairs at Site Tower 5, as per the highlighted
Coordinates and Levels For Walls of Internal Garden (at section 08), Inside Aviary Garden, As per High
Sand Bedding for Low Current Lines (MH/PG/LC/19 to 20 to 22) Inside Physic Garden as highlighted ar
Concrete Pouring for Blinding under Low Current Handhole (MH/PG/LC/01, 20 & 22) Inside Physic Gard
Installation of PVC Conduit (Dia. 25mm) and Boxes for Voice & Data (DATA & Telephone) at Ground Fl
Installation of Earthing Clamps with conductor 70mm2 for Earthing System reinforcement steel re-bar
Installation of straight UPVC Conduit (Dia. 160mm) Low Voltage Ductbank (4x160mm) No. CC/D-LV/21
Installation of straight UPVC Conduit (Dia. 160mm) Low Voltage Ductbank No. CC/D-LV/10 (C/LV/23 to
Installation of straight UPVC Conduit (Dia. 25mm) for Power (Socket outlet) at ground floor in South
Level and location for blindnig under strip footing around soakaway, at North admin buolding at Zone
Tent Muck Up For Physic Garden (OUTER 3)
Two Coats of Bituminous Damp Proof Coating for Footing and Grade Beam at Energy Center , Axis 4-6/A
Excavation for Telecommunication Line at Zone-C Including Pit C/TL/14, C/TL/01, C/TL/02, C/TL/15, C/TL
Excavation and Soil Preparation prior to start backfilling Layers forSecurity Perimeter Road (South), S
Block Work for Retaining Block Wall , at Zone 2C (As Highlighted)
Shuttering and Concreting for Footing ( F1 & F4 ) and Grade Beam at Energy Center , Axis 17-19/N , 17-2
Excavation for Fire & Security Distribution Line At Zone-C&D Including Pit C/FS/02, C/FS/39, C/FS/01, C/
Inspection for Blinding Concrete under Telecommunication Line Pit - C/TL/39, C/TL/66, C/TL/41, C/TL/6
Inspection for backfilling Gravel 1st & 2nd Layer (1,2 of 2) for MH-Q-01, MH-Q-02, MH-Q-03, MH-Q
Installed ETFE Cushions between Axis 02/Z - 02/AA (without Aluminum Caps).
Level and Location for South Administration Building Columns and Walls , ( Column ( C51 ( Level from
Inspection of Sand bedding under pipe for RO Water Line at Zone-B - As highlighted (Sand from Source -
Shuttering for South Administration Building Columns and Walls , ( Columns ( C51 ( Level from 868.50
Inspection of Formwork for Wall of MV Line Pulling Pit - D/MV/12 at Zone-D (As Highlighted)
Inspection and compaction test for 1st Layer of Gravel at South Administration , Beside Strip footing , B
Inspection of Steel Reinforcement for Slab of MV Line Pit - E/MV/08 and E/MV/09 at Zone-E - As Highlig
Steel Reinforcement for Duct Tunnel wall for MCPE 2, Zone 2J, Axis 03J-03L (as highlighted)
Inspection of Formwork and Concrete Pouring for Slab of MV Line Pit - E/MV/08 and E/MV/09 at Zone-E
Inspection and Compaction test for 10th & 11th Layers of Backfilllng between duct tunnel Shaft of MC
Level and Location for Infill wall ( Outer ) at Zone 1B , Between Axis 01G-01F, (As Highlighted)
Level and Location for Plain Concrete Under Diaphragm Wall foundation , Zone 1K , Grid 01/AF , Level u
Concreting for Infill wall ( Outer ) at Zone 1B , Between Axis 01G-01F, (As Highlighted)
Inspection and Compaction test for backfilling Sub-base 2nd Layer (2 of 2) for Car Park-J (CPJ6 - ST. 0+
Shuttering for Infill wall ( Outer ) at Zone 1B , Axis 01G and 01F, (As Highlighted)
Steel Reinforcement for Diaphragm wall ( Wall ) , at Zone 1C , Axis 01G , (as highlighted)
Inspection and Compaction test for backfilling Sub-grade 3rd Layer (3 of 3) for Southern Car park access
Steel Reinforcement for Infill Wall ( Stiffner )( Vertical ) , Zone 2B , Between Axis 02E-02D , level upto 8
Shuttering for Plain Concrete Under Diaphragm Wall foundation , Zone 1K , Grid 01/AF , Level upto 866
Inspection of Sand bedding under pipe for Telecommunication Line at Zone-C - as highlighted (Sand fro
Antitermite Under Plain Concrete Under Diaphragm Wall foundation , Zone 1K , Grid 01/AF (As Highligh
Installation of Ligthning Arrester Rod OPR System with Tripod and Ligthning Down Conductor (25mm
Inspection and Compaction test for 7th Layer backfilling For Infill Wall , Zone 2A, Axis 02C-02D (as high
Inspection of Sand bedding under pipe for Fire & Security Distribution Line At Zone-C - as highlighted (
Steel Reinforcement for Cafeteria Staircase of Ground floor , at Zone 2A , Axis between 02C-02D ( As Hig
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 2) above sand covering for Hea
Installation of Ligthning Arrester Rod OPR System with Tripod and Ligthning Down Conductor (25mm
Inspection of Blinding Concrete under Potable Water Line Pit for D/PW/01 at Zone-D - as highlighted
Inspection of Blinding Concrete under Fire Water Line Pit for D/F/01 & D/F/02 at Zone-D - as highlighted
Inspection of Blinding Concrete under Heating & Chilled Water Line Pit L/DH/05, L/DH/06, L/DC/07, L
Inspection and Compaction test for backfilling Sub-grade 5th, 6th, 7th & 8th Layer (5,6,7,8 of 10) in Wa
Inspection and Compaction test for backfilling Sub-grade 7th, 8th, 9th & 10th Layer (7,8,9,10 of 10) a
Inspection for Installation of Stone Cladding without Copping for Seating Area 3 - 28 at Zone-K (As Highl
Pre insulated Chilled pipes, ( laying ,Aligment ,Leveling and fit up) Chilled 150mmØ. Branch from
' Installation of Storm Water Pipes Main Line (uPVC Class 4 400mm Ø) from (MH-N-12 to MH-N-13) &
'Bedding of Gravel 3/8" and Geotextile surrounding in Storm Water Pipes Main Line (uPVC Class 4 4
Installation of Sub-Surface Drainage Pipes (Perforated 110mm Ø uPVC Class 4) at Water Garden. As
Gravel (Drainage) & Geo Textile (Filter membrane Terrain) for Tree Pits (13 no's Palm) along Boundar
Shuttering for South Administration Building Columns and Walls Columns (((29,C30,C32, 33,C34,C3
Marking and Excavation for Tree Pits (47 no's) Surround Boat Garden, inside Water Garden, at high
Concreting for Diaphragm wall Slab at Zone 1E , Axis 01/M , Level Upto 869.00 (as highlighted)
Concreting for Child Care Walls ( W2 ) ,( W3 ( 2nos) ) & ( W7 ) at Zone 2N (As Highlighted)
CIONCRETING FOR SOUTH SMALL MOSQUE
Inspection of Concrete (Plain) Pouring for the Duct Bank of MV Line from H/MV/27 to H/MV/09 and f
Employer\‫صــاحـباــلعمل‬: Contractor\‫ اــلمقاوـل‬: Shuttering f
Coordinates & Levels for Wall of Wet Well Beside Water Feature, at Management and Maintenance
Marking and Excavation for Tree Pits (13 no's Palm) along Boundary wall (Inner Side), Inside Physic
Excavation & Surface preparation for Plantation area's along Boundary wall (Inner Side), Inside Physic
Sand Cover and Protection for Irrigation Lines (Dia 63 & 110 mm) at Entrance, inside Butterfly Garden
Excavation for Low Current Lines (MH/PG/LC/19 to 20 to 22) Inside Physic Garden as highlighted area
Excavation and Blinding Levels for Low Current Handhole (MH/PG/LC/01, 20 & 22) Inside Physic Garde
Concrete Pouring for Blinding under Electrical Handholes of Emergency (MH/PG/EM/01) and Low Volta
Excavation and Blinding Levels for Electrical Handholes of Emergency (MH/PG/EM/01) and Low Voltag
Excavation and Surface preparation Prior to Backfilling for Exposed Aggregate Paving Walk way area, a
Protection Layer of 4 mm Thk. Bituminous Protection Board for Pedestal Columns & Footings top of Ca
Concrete Pouring & Shuttering for Dome of New Ticketing Booth # 7A, As per Attached Highlighted D
Inspection of Sand bedding under pipe Fire & Security Distribution Line from C/FS/29 to H/FS/29 at Zon
Inspection and Compaction test for backfilling Sub-grade 4th Layer (4 of 6) above Sand covering for He
Installation of Rock and Boulder No. WRB-47 - 2nd layer (2 of 5) - As Highlighted
Inspection of Blinding Concrete under Telecom Line Pit - E/TL/02, E/TL/09, E/TL/01, D/TL/07, D/TL/01,
Inspection of Blinding Concrete under Fire & Security Line Pit - C/F/S/23, C/F/S/27, C/F/S/31,C/F/S/50,
Inspection of Blinding Concrete under Fire & Security for Pit - E/FS/02, E/FS/01, E/FS/11, D/FS/11,
Inspection for Cut and Removal of Disposal Material from Existing Asphalt upto (-0.75cm) at Car Parking
Inspection for Cut and Removal of Disposal Material from (-0.75cm) to Rock Level at Car Parking F (CPF)
Inspection of Excavation for Heating & Chilled Water Line at Zone-H&L - as highlighted
Inspection for Laying of GreenTiles and Warning tape above Sand cover for Fire & Security Distribution
Inspection for Laying of Green Tiles and warning tape above Sand cover for Telecommunication Line fro
Inspection of Concrete (Plain) Pouring for the Duct Bank of LV Line from B/LV/14 to B/LV36 at Zone-B (A
Inspection of Excavation for Storm Water between MH-I-09 to MH-I-05 including all branches and Manh
Inspection of Sand bedding under pipe for Non-Potable Water Line at Zone-C&H - as highlighted (Sand f
Inspection of Sand bedding under pipe for Potable Water Line at Zone-H - as Highlighted (Sand from Sou
Inspection of Sand bedding under pipe for Heating & Chilled Water Line at Zone-H - as highlighted (San
Inspection of Sand bedding under pipe for Fire Water Line at Zone-H - as highlighted (Sand from Source
Inspection of Excavation for Heating & Chilled Water Line Pit C/DC/03, C/DC/04, H/DC/01 & H/DC/02 at
Inspection of Sand bedding under pipe for RO Water Line at Zone-H - As highlighted (Sand from Source -
"Inspection and Compaction test for backfilling Sub-grade 2nd & 3rd Layer (2,3 of 3) above Gravel fo
Inspection of Excavation for LV Line From B/LV/40 to C/LV/08 at Zone-C Including Branch and Pits - C/LV
Inspection of Blinding Concrete under Heating & Chilled Water Line Pit G/DH/14, G/DH/17 at Zone-G - as
Inspection of Excavation for Heating & Chilled Water Line Pit G/DH/14, G/DH/17 at Zone-G - as highlight
Inspection and Compaction test for backfilling Sub-grade 1st & 2nd Layer (1,2 of 3) for Southern Car par
Inspection of Blinding Concrete under Heating & Chilled Water Line Pit H/DC/31, L/DC/16 at Zone-H - as
Inspection of Excavation for Heating & Chilled Water Line Pit H/DC/31, L/DC/16 at Zone-H - as highlighte
Inspection and compaction test for backfilling Sub-grade 3rd, 4th, 5th Layer (3,4,5 of 5) above Gravel
Surface Preparation and Primer Coating for MCPE 2 Under Rc Duct Tunnel Foundation , at Zone 2K , Ax
Two Layers of 4mm thick Modified Bituminous WaterProofing Membrane for MCPE 2 Under Rc Duct Tunn
Protection Layer of Geotextile and Screed for MCPE 2 Under Rc Duct Tunnel Foundation , at Zone 2K ,
Steel Reinforcement for Energy Center Wall ( W2 & W3 ) , Axis 14-16/L-R ,Level 877.00 (As Highlighted)
Surface Preparation Prior to Start Backfilling ( NGL ) Under foundation at Cenozoic Garden , Zone 1C 1D
Inspection and compaction test for 3rd and 4th Layer ,for Underground Drainage Pipe , UPVC dia 110 ,
Inspection and compaction test for 3rd , 4th & 5th Layer ,for Underground Drainage , Soak Away ( CG
Concreting for Front Canopy Post Support Corbel ( Block ) ( 3 nos ) , Zone 4&5 , Axis 01C-01D-01E-01F (
Shuttering for Front Canopy Post Support Corbel ( Block ) ( 3 nos ) , Zone 4&5 , Axis 01C-01D-01E-01F (
Steel Reinfocements for Front Canopy Corbel ( 3 nos ) , Zone 4&5 , Axis 01C-01D-01E-01F (as highlighted
Installation and Survey Report for Location and Levels of Retaining wall front canopy Corbel Anchor Bo
Level and Location for Front Canopy Post Support Corbel ( Block ) ( 3 nos ) , Zone 4&5 , Axis 01C-01D-0
Steel Reinforcement for Diaphragm wall ( wall ) at Zone 2M , Grid 02/AL, (as highlighted)
Concreting for Diaphragm wall (wall 1st stage) at Zone 1B , Axis 01F , Level Upto 872.50 (as highlighted)
Level and Location for Diaphragm Wall at Zone 1B , Axis 01F (As Highlighted) level up to 872.50
Shuttering for Diaphragm wall, at Zone 1B, axis 01F, Level upto 872.50 (as highlighted)
Filed joint jacketing for Pre-insulated Heat & Chilled Water Pipes. Heat water pipes (dia 200m
Concreting for North Administration Building ,Concrete pad on roof Floor ,at Zone 2R ,Axis 02AZ-02BB , L
"Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 2) above Gravel for Storm W
"Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 1) above Red Tiles for LV Line
Inspection and Compaction Test for backfilling 1st Layer (1 of 1) Above Greentiles for Fire & Security D
Inspection and Compaction Test for backfilling 1st Layer (1 of 1) Above Green Tiles for Telecommunicat
Inspection for Laying of Red Tiles and Warning Tape above sand cover for LV Line from D/LV/07 to SBC-0
Inspection for Laying of GreenTiles and Warning tape above Sand cover for Fire & Security Distribution
Inspection of Excavation for Tree Pit (16 No's) as Details D-38-1 inside wadi area - as highlighted
Inspection for Laying of Green Tiles and warning tape above Sand cover for Telecommunication Line fro
Excavation for Fire & Security Distribution Line Pit C/FS/14, L/FS/07, L/FS/28 at Zone-C&L - as highlighte
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 2) above Gravel around St
Inspection of Sand Covering Layer for Protection of MV Line from H/MV/06 to H/MV/31 at Zone-H - as h
Inspection and Compaction test for backfilling Sub-grade 2nd Layer (2 of 3) above Gravel for Storm W
Inspection of Sand bedding under pipe for LV Line between F/LV/05 and PCCU/4 at Zone-F&G - as highl
Inspection and Compaction test for backfilling Sub-grade 1st & 2nd Layer (1,2 of 2) above Sand Coverin
Surface preparation & Sand Filling prior to Blinding of SOG, Inside Site Tower 4, as per the highlight
Inspection and Compaction Test for Backfilling Sub-Base Prior to Blinding under Stone Steps of Stairs
Excavation and Bed preparation for Sub Suface Lines for Palm Trees (110mm Pipes) Between Outer Can
Excavation and bed preparation for sub surface drainage pipes (for trees) At Bottom Side of Water Pl
Inspection of Thrust Blocks for Irrigation Sub main Lines (Dia 50, 63 & 110 mm) inside Butterfly Garde
Gravel (Drainage) & Geo Textile (Filter membrane Terrain) for Landscaping and Plantation area's, a
Stack Boulders Installed Layer 1 & 2 for Planted beds (7 no's) at center of Discovery Garden, as highl
Inspection of Top levels for Stone Coping on Walls of Outer Canopy 3 to Close the Site Instruction K
Installation of UPVC Conduit (2x110mm) Low Current Ductbank (Fire & Security) Manhole (M/FS/06 to L
Installation of UPVC Conduit (2x110mm) Low Current Ductbank (TELECOM) Manhole (M/TL/07 to L/TL/21
Steel Reinforcements for Perimeter Wall ( 1st Stage ) ( Outer ) at zone 1K , Axis 01AD-01AE-01AF , Leve
Excavation and Surface Preparation for hot and chilled Water Pipe Lines , Portable and Non Portable f
Level and Location for North Administration Building Retaining Block Wall Strip Foundation ,at Zone 2R
Steel Reinforcements for Cafeteria Ground Floor Slab , at Zone 2A , Axis between 02A-02C , Level 869.10
Single Layer of 4mm thick Modified Bituminous WaterProofing Membrane on top of Mass concrete Under
Surface Preparation and Primer coating on top of Mass concrete Under Rc Footing of Diaphragm Wall , a
Concreting for North Administration Building Retaining Block Wall Strip Foundation ,at Zone 2R ,Axis 02
Shuttering for North Administration Building Retaining Block Wall Strip Footing ,at Zone 2R ,Axis 02AZ-0
Steel Reinforcement for North Administration Building Retaining Block Wall Strip Footing ,at Zone 2R ,A
Shuttering for North Administration Building ,Concrete pad on roof Floor ,at Zone 2R ,Axis 02AZ-02BB , L
Steel Reinforcements (Implant) for Cafeteria Beam , at Zone 2A , Axis between 02A-02B ( As Highlighte
Steel Reinforcemnet for South Tower Abutment Walls ,at Zone 7 , Grid 02C , (As Highlighted)
Steel Reinforcement for North Administration Building Rc foundation (W7 & P15 ) Zone 2Q , Axis Betw
Single Layer of 4mm thick Modified Bituminous Water Proofing Membrane for diaphragm wall Under Fou
Surface Preparation Prior to Start Backfilling Beside Strip footing for South Administration Isolated foot
Installation of Trees Sub-Surface Drainage Pipes (Perforated 110 mm Ø UPVC Class 4 ) at Water Gard
'Bedding of Gravel 3/8" and Geotextile Surrounding Trees Sub-Surface Drainage Pipes (Perforated 1
Installation of Irrigation ROW Sub-Mainline (110mm Ø, 63mm Ø, 50mm Ø) at Butterfly Garden as pe
Installation of Mechanical Pipe Sleeves uPVC Class-4 (315mm Ø for RW & 160mm Ø for VP) at Cresce
Level and Loaction for Diaphragm Wll ( Wall ) at Zone 2M , Grid 02/AL , ( As Huighlighted ) upto Leve
Level and Location for Mass Concrete ( 1st Layer ) Under Diaphragm Wall foundation , Zone 1L , Axis 01
Level and Location for perimeter wall(outer sloped ) , Zone 1M , Axis Between 01AJ- 01AK , levelupto 87
Inspection and compaction test for 1st and 2nd Layer ,for Underground Drainage , Soak Away UPVC dia 1
Inspection and compaction test for 1st and 2nd Layer ,for Underground Drainage , UPVC dia 110 , fom
Shuttering for Diaphragm Wall ,at Zone 2M , Axis 02AL ( As Highlighted ) , Upto Level 873.50
Concreting for Infill Wall (outer sloped ) , Zone 1M , Axis Between 01AJ- 01AK , levelupto 873.8 ( As High
Concreting for Diaphragm Wall at Zone 2M , Axis 02Al , Upto Level 873.50 (As Highlighted )
Shuttering for Mass Concrete ( 1st Layer ) Under Diaphragm Wall foundation , Zone 1L , Axis 01-G (As Hi
Surface Preperation prior to start backfilling for MH-Q-01, MH-Q-02, MH-Q-03, MH-Q-03-1, MH-Q-
Concreting for Mass Concrete ( 1st Layer ) Under Diaphragm Wall foundation , Zone 1L , Axis 01-G , TO
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 3) above Gravel for Storm W
Concreting of Rc Foundation of Central Bridge Abutment , Zone 4, 02AG-02AH ( As Highlighted )
Inspection of backfilling Gravel 9th and 10th Layer (9,10 of 10) for Storm Water Line from MH-M-02-02
Inspection of backfilling Gravel 7th and 8th Layer (7,8 of 10) for Storm Water Line from MH-M-02-02 t
Inspection of Excavation for RO Water Line at Zone-B - As highlighted
Shuttering for perimeter wall(outer sloped ) , Zone 1M , Axis Between 01AJ- 01AK , levelupto 873.8 ( As
Inspection of Sand bedding under pipe for RO Water Line at Zone-B - As highlighted (Sand from Source -
Inspection of Excavation for Heating & Chilled Water Line at Zone-H - as highlighted
Inspection and compaction test for 1st Layer of Gravel at South Administration , Beside Strip footing , B
Inspection of Excavation for Fire Water Line at Zone-H - as highlighted
Surface Preparation Prior to Start Backfilling at South Administration , Beside Strip footing , Between In
Inspection of Excavation for Non-Potable Water Line at Zone-C&H - as highlighted
Inspection of Excavation for Potable Water Line at Zone-H - as Highlighted
Inspection of Spatter Dash ( Rush Coat ) for Pump room no # 6050 at Zone 2M , Axsi 02AN ( As Highli
Inspection of Excavation for RO Water Line at Zone-H - As highlighted
Inspection of Excavation for LV Line Pit L/LV/07 at Zone-L - as highlighted
Grouting for Stone Cladding of Boundary wall (Outer Side) at Span 13 & 14, As per Attached Highligh
Inspection of Spatter Dash ( Rush Coat ) for Pump room no # 6046 at Zone 2R , Axsi 02AR ( As Highlig
Inspection of Excavation for LV Line between F/LV/05 and PCCU/4 at Zone-F&G including Pit - F/LV/26,
Grouting for Stone Cladding of Boundary wall (Outer Side) at Span 15 & 16, As per Attached Highligh
Antitermite Under Mass Concrete ( 1st Layer ) Under Diaphragm Wall foundation , Zone 1L , Axis 01-G (A
Steel reinforcement for Infill Wall (Inner ) at zone 1L , Axis 01AH-01AI ( As Highlighted )
Primer Coating prior to Damp Proofing for Footing & Wall of Seat Wall (Inner) (Remaining Right Side) A
Steel reinforcement for Infill Wall ( Outer ) at zone 1m , Axis 01AK-01AL ( As Highlighted )
Surface Preparation prior to Water Proofing for Footing & Wall of Seat Wall (Inner) (Remaining Right S
Level and Location for RC Strip Foundation ( Outer ) at Zone 1J ,Between Axis 01AC-01AD (as highlight
Concreting for RC Strip Foundation ( Outer ) at Zone 1J ,Between Axis 01AC-01AD (as highlighted)
Shuttering for RC Strip Foundation ( Outer ) at Zone 1J ,Between Axis 01AC-01AD (as highlighted)
Steel reinforcement for RC Strip Foundation ( Outer )at Zone 1J ,Between Axis 01AC-01AD (as highlight
Concreting for Child Care SOG , at Zone 2N , Level 870.91 & 871.08 (As Highlighted)
Shuttering and Concreting for Footing ( F1 & F4 ) and Grade Beam at Energy Center , Axis 17-19/N , 17-2
Concreting for Infill Wall (Stiffiner) wall at axis 01G (BII-8) , 01F (BII-7) (A highlighted) Zone 1B
Shuttering for Child Care SOG , at Zone 2N , Level 870.91 & 871.08 (As Highlighted)
Steel Reinforcements for Infill wall (Inner) of Zone 2K at Axis 02AG-02AF ( As Highlighted)
Inspection and compaction test for 4th Layer backfilling for Strip footing ( Outer ) , Zone1K , Axis 01AD-
Installation of PVC Conduit (Dia. 25mm) and Boxes for Voice & Data (DATA &TV & Telephone) at Groun
Installation of PVC Conduit (Dia. 25mm) and Boxes for Security (Card Redaer, Break Glass for Emergen
Installation of PVC Conduit (Dia. 32mm) & Box for Lighting Fixture (Lighting Switch) at ground floor
Installation of straight UPVC Conduit (Dia. 32mm) for Power (Three Phase Isolater) at ground floor i
Installation of PVC Conduit (Dia. 25mm) & Box for Lighting Fixture (LED K, K/CE, Scene Switch) at gro
Installation of straight UPVC Conduit (Dia. 25mm) for Power (Socket outlet, Fused Connection) at gro
Installation of straight UPVC Conduit (Dia. 25mm) for Power (Socket outlet) at ground floor in South
Installation of PVC Conduit (Dia. 25mm) & Box for Lighting Fixture (LED K, K/CE) at ground floor in S
Installation of Water Feature Puddle Flanges (160mm Ø, 50mm Ø, 32mm Ø) uPVC Class 5 for Wet Wel
Installation of Fire Fighting Pipe Sleeves uPVC Class-4, 250mm Ø at Crescent 2 Diaphragm Wall Sout
Pre insulated Heat Water pipes, ( laying ,Aligment ,Leveling and fit up) Heat 200mmØ.From point
Stack Boulders Installed Layers at levels +880.50, Behind Wing Wall of SBC 07, at Wadi # 2, Inside Wa
Stack Boulders Installed Layers at levels +876.00, 876.40, 876.80, 877.20, 877.60, 878.10, 878.50 &
Stack Boulders Installed Layers at levels +875.60 & 876.00, Behind Wing wall of SBC 08 (Boundary wal
Inspection and Compaction test for 6th Layer backfilling For Infill Wall , Zone 2A , Axis 02C-02D , 02/1
Surface Preparation Prior to Stone Cladding for Walls of Water feature Pump room, Cabin Room, ETFE
Excavation and Bed preparation for Sub Suface Lines for Palm Trees (110mm Pipes) Between Outer Can
Installation of PVC Conduit (Dia. 25mm) & Boxes for Fire Alarm (Break Glass, Speaker) at Ground Floo
Installation of PVC Conduit (Dia. 25mm) and Boxes for Fire Alarm (Flashing Beacon) at Ground Floor F
Inspection and Compaction test for backfilling sub-grade 1st Layer (1 of 2) for Storm Water Line from
Inspection for Installation of Stone Cladding without Copping for Seating Area 3 - 36 at Zone-K (As Highl
Inspection for Installation of Stone Cladding without Copping for Seating Area 3 - 35 at Zone-K (As Highl
"Inpection of Casting Concrete for Short Piece & Surface Preperation prior to start waterproofin
Inspection of Concrete Encasement for all Storm Water Line branches and Surface preparation prior to s
Inspection of Blinding Concrete under Heating & Chilled Water Line Isolation Pit for C/DC/01 & L/DC/15
Inspection of Excavation for Heating & Chilled Water Line Pit L/DC/15 at Zone-L - as highlighted
Installation of PVC Conduit (Dia. 25mm) and Boxes for Voice & Data (DATA & Telephone) at Ground Fl
Inspection of Blinding Concrete under LV Line Pit - C/LV/12 at Zone-C - as highlighted
Inspection of Sand bedding under pipe for Heating & Chilled Water Line at Zone-C as highlighted (Sand
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 1) for Heating & Chilled Water
Inspection for application of Base Primer and Bituminous Damp Proofing (1st & 2nd Coat) for Footing a
KAIG3-SD-SW-C-GA-1111-03, KAIG3-SD-SW-C-GA-1112-03, KAIG3-SD-PA-S-WP-1004-01, KAIG3-SD-PA-
Inspection of Blinding Concrete under MV Line Pit - C/MV/10 at Zone-C - as highlighted (KAIG3-SCR-SW
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 2) above Warning Tape for Hea
Excavation for Telecommunication Line at Zone-C&D Including Pit C/TL/14, C/TL/01, C/TL/02, C/TL/15, C
Excavation for Fire & Security Distribution Line At Zone-C&D Including Pit C/FS/03, C/FS/02, C/FS/39, C
Inspection of Excavation for LV Line From C/LV/02 to C/LV/17 at Zone-C Including Branch and Pits - C/
Inspection for Cut and Removal of Old utilities and Disposal Material existing infornt of Phase-2 as per
Surface Preparation prior to start backfilling for Southern Car park access road at Zone-G - as highlighte
"Inspection for Installation of Slab for MV Line Pit - C/MV/28, D/MV/12, E/MV/08, E/MV/09 at Zone-C
Inspection of Excavation and Surface Preparation for Heating & Chilled Water Line at Zone-G - as highlig
Inspection of Excavation and Surface Preparation for Heat and Chilled water Line Pit L/DC/09, L/DC/10 a
Inspection of Excavation for Telecommunication Line Pit L/TL/46, L/TL/11 at Zone-L - as highlighted
Inspection and Compaction test for backfilling Sub-grade 5th Layer (5 of 5) around Manhole FW-A-3-5 -
Inspection and compaction test for backfilling Sub-grade 3rd Layer (3 of 5) above Gravel around Manhol
Inspection and Compaction test for backfilling Sub-grade 2nd Layer (2 of 10) in Wadi Garden (Crescent a
Inspection of backfilling Gravel 4th, 5th and 6th Layer (4,5,6 of 10) for Storm Water Line from MH-M-0
Inspection ofSand bedding under pipe for Non-Potable Water Line at Zone-D - as highlighted (Sand from
Inspection of Sand bedding under pipe for Fire Water Line at Zone-D - as highlighted (Sand from Source
Inspection of Sand bedding under pipe for Potable Water Line at Zone-D - as Highlighted (Sand from So
Inspection of Sand bedding under pipe Fire & Security Distribution Line from G/RC-FS/44 to G/RC-FS/29
Inspection of Sand bedding under pipe for Telecommunication Line From G/TL/27 to G/TL/51 Including B
Inspection of Sand bedding under pipe for RO Water Line branch at Zone-G - As highlighted (Sand from
Installation of Rock and Boulder No. WRB-10 - 3rd layer (3 of 3)
Protection Layer of 4mm thick Bituminous Protection Board for Central Bridge Abutment Rc Footing , Ax
Two Layers of 4mm thick Modified Bituminous WaterProofing Membrane for Central Bridge Abutment Rc
Level and Location for North Administration Building Rc foundation (W7 & P15 ) Zone 2Q , Axis Betwe
Level and Location for North Administration Building Core Wall ,Zone 2Q , Axis Between 02AX- 02AY , Le
Concreting for North Administration Building Rc foundation (W7 & P15 ) Zone 2Q , Axis Between 02AW-
Shuttering for North Administration Building Rc foundation (W7 & P15 ) Zone 2Q , Axis Between 02AW-
Concreting for North Administration Building wall ( W12 ) ,Zone 2Q , Axis 02AY , Level upto 873.475 (as
Concreting for Staircase ( Step , Riser , Landing ) from ground to 1st Floor of North Administration Buil
Protection Layer of Geotextile and Screed Under Rc Duct Tunnel Foundation for ( 3 Parts ) at MCPE 2
Two Coats of 4mm thick Modified Bituminous WaterProofing Membrane Under Rc Duct Tunnel Foundation f
Surface Preparation and Primer Coating Under Rc Duct Tunnel Foundation for ( 3 Parts ) at MCPE 2 , Z
Steel Reinforcement for Energy Center Columns , Zone 5A , Axis 1/C-I , 2/C-G , 13-14/D-H , Level upto
Level and Location for RC Strip Foundation ( Outer ) at Zone 1J ,Between Axis 01AA-01AC (as highlighte
Level and Location for RC Strip Foundation ( Inner ) at Zone 1J ,Between Axis 01AA-01AD (as highlighte
Level and Location for Mass concrete ( 2nd Layer ) ( Inner ) Under Strip footing at Zone 1J , Axis 01AA-
Concreting for RC Strip Foundation ( Outer ) at Zone 1J ,Between Axis 01AA-01AC (as highlighted)
Shuttering for RC Strip Foundation ( Outer ) at Zone 1J ,Between Axis 01AA-01AC (as highlighted)
Steel Reinforcement for Infill Perimeter wall (Outer ) at Zone 1L , Axis 01AI-01AJ , Level upto 874.05 (A
Antetermite under Blinding under S.O.G of ETFE pump Room # 6098 in Zone 2H , Axis 02AA (as highligh
Steel Reinforcment for Central Bridge Abutment Rc Foundation , Zone 4 , Grid 01/M , TOC 866.550 (as h
Shuttering for Infill wall (Inner) of Zone 2K at Axis 02AG-02AF ( As Highlighted)
Shuttering for Central Bridge Abutment Rc Foundation , Zone 4 , Grid 01/M , TOC 866.550 (as highlight
Concreting for internal building wall for stair between axis (02-BB & 02-BA) at Zone 2R,(As Highlighted)
Shuttering for Central Bridge Abutment WallZone 4 , Grid 02-AH , Level From 869.70 to 870.22 (as highl
1st coat of Cementitous water proof Coating prior Stone Cladding for Infill wall ( Inner ) ( Outer Side ) ,
1st coat of Cementitous Water Proof Coating Prior Stone Cladding for Infill wall ( Inner ) ( Outer Side ) ,
Concreting for Centrel Bridge Abutment Wall , Zone 4 , Grid 02-AH , Level From 869.70 to 870.220
1st coat of Cementitous Water Proof Coating Prior Stone Cladding for Infill wall ( Inner ) ( Outer Side ) ,
Level and Location for Child Care blinding under SOG at Zone 2N axis 02AR (As Highlighted) TOC 870.47
Coordinates & Levels for Foundation of Dinosaur inside Discovery Garden, as highlighted in the attac
Inspection and Compaction Test for Backfilling Sub-Base Between 2nd & 3rd line of boulders at Right
Steel reinforcement for Wall of Over Flow Chamber at Geyser Garden, inside Water Garden as highli
Concrete Pouring & Shuttering for Foundation of Dinosaur inside Discovery Garden, as highlighted in
Steel Reinforcement for Foundation of Dinosaur inside Discovery Garden, as highlighted in the attac
Level and Location for Central Bridge Abutment Walls , Zone 4 , Grid 02/AL , TOC 870.22 (As Highlighted)
Level and Location for Central Bridge Abutment WallZone 4 , Grid 02AK , Level From 869.70 to 870.22 (
Level and Location for Infill wall ( Inner ) at Zone 1A , Axis 01B-01C , TOC 876.00 (As Highlighted)
Level and Location for Infill wall ( Inner ) at Zone 1A , Axis 01C-01D , TOC 876.00 (As Highlighted)
Concrete Pouring for Blinding under Stone Steps of Stairs (Outer 3 no's), inside Physic Garden, as high
Level and Location for Child Care SOG , at Zone 2N , Level 870.91 & 871.08 (As Highlighted)
Level and Location for Diaphragm wall ( Rc Footing and Strip ) at Zone 1C , Axis 01G , Level upto 868.50
Level and Location for Blinding Under SOG at North Admin Building at Zone 2R, Axis 02AZ-02BA , Level u
Level and Location for Central Bridge Abutment Rc Foundation , Zone 4 , Grid 01/M , TOC 866.550 (As Hi
Concreting for Blinding Under SOG at North Admin Building at Zone 2R, Axis 02AZ-02BA (As Highlighted)
Concreting for Diaphragm wall ( Rc Footing and Strip ) at Zone 1C , Axis 01G , (as highlighted)
Shuttering for Diaphragm wall ( Rc Footing and Strip ) at Zone 1C , Axis 01G , (as highlighted)
Antitermite Under Blinding UnderSOG,at North Admin Building at Zone 2R, Axis 02AZ-02BA (As Highlight
Shuttering for Blinding Under SOG at North Admin Building at Zone 2R, Axis 02AZ-02BA (As Highlighted)
Steel Reinforcement for Diaphragm wall at Zone 1B , Axis 01F , Level upto 872.50 (as highlighted)
Steel reinforcement for Infill wall ( Outer ) at Zone 1B , Axis 01G and 01F, (As Highlighted)
Steel Reinforcement for Diaphragm wall ( Rc Footing and Strip ) at Zone 1C , Axis 01G , (as highlighted)
Steel Reinforcement for Child Care SOG , at Zone 2N , Level 870.91 & 871.08 (As Highlighted)
Shuttering for Infill wall ( Inner ) at Zone 1A , Axis 01C-01D , TOC 876.00 (As Highlighted)
Concreting for Infill wall ( Inner ) at Zone 1A , Axis 01C-01D , TOC 876.00 (As Highlighted)
Shuttering for Infill wall ( Inner ) at Zone 1A , Axis 01B-01C , TOC 876.00 (As Highlighted)
Concreting for Infill wall ( Inner ) at Zone 1A , Axis 01B-01C , TOC 876.00 (As Highlighted)
Shuttering for Child Care Grade Beam , at Zone 2N (As Highlighted)
Concreting for Child Care Grade Beam , at Zone 2N (As Highlighted)
Shuttering for Central Bridge Abutment WallZone 4 , Grid 02AK , Level From 869.70 to 870.22 (as highli
Concreting for Central Bridge Abutment WallZone 4 , Grid 02AK , Level From 869.70 to 870.22 (as highli
Shuttering for Blinding Under SOG, at Child Care , Zone 2N, Axis 02AR-02AS (As Highlighted)
Concreting for Blinding Under SOG, at Child Care ,Zone 2N, Axis 02AR-02AS (As Highlighted)
Shuttering for Central Bridge Abutment Walls , Zone 4 , Grid 02/AL , (As Highlighted)
Concreting for Central Bridge Abutment Walls , Zone 4 , Grid 02/AL , (As Highlighted)
Shuttering for Infill wall (Inner) at zone 2A Between 02C-02D from 863.55 to 869.16 (As Highlighted)
Surface Preparation and Primer Coating for North Administration Building Inner Infill Wall ( Inner side )
Shuttering for South Administration Building Columns and Walls Columns ( C1a ) Level from 868.50 to
Inspection for Double Layer of 20cm Block Work and 10cm block work around the Columns from top of
Inspection for Double Layer of 20cm Block Work and 10cm block work around the Columns from top of
Inspection for 1st Layer of Block Work layout , Double Layer of 20cm Block and 10cm Block around the c
Installation of Manhole Connection for Medium Voltage Ductbank (Dia. 160mm) Manhole Pit - C/MV/1
Installation of straight UPVC Conduit (Dia. 160mm) Low Voltage Ductbank No. GG/D-LV/07 (G/LV/07
Installation of UPVC Conduit (2x110mm) Low Current Ductbank (TELECOM) Manhole (L/TL/15 to L/TL/09
Installation of UPVC Conduit (2x110mm) Low Current Ductbank (Fire & Security) Manhole (L/FS/15 to
Installation of UPVC Conduit (2x110mm) Low Current Ductbank (TELECOM) Manhole (L/TL/51 to L/TL/46)
Installation of UPVC Conduit (2x110mm) Low Current Ductbank (Fire & Security) Manhole (L/FS/10 to L
Installation of UPVC Conduit (2x75mm) Low Current Ductbank (Fire & Security) in between Manhole (
Grouting for Stone Cladding of Boundary wall (Outer Side) at Span 17 & 18, As per Attached Highligh
Inspection for Installed Electrical Handholes of Low Voltage (MH/WG/LV/31, 32 & 48), Inside water Ga
Stack Boulders Installed Layer at level +879.90, 880.20 & 880.700, at Separate Boulder Line (Remainin
Excavation for Landscaping and Plantation Area's Surround Boat Garden, inside Water Garden, at hi
Excavation for Landscaping and Plantation area's, at Bottom Left side of Geyser Gardens, inside Wa
Concrete Pouring & Shuttering for Dome of New Ticketing Booth # 7A, As per Attached Highlighted D
Concrete Pouring & Shuttering for Roof Slab on Site Tower 5, as per the highlighted attached Drawing
Steel Reinforcement For Foundations of Internal Garden, Inside Aviary Garden, As per Highlighted in
Installation of straight UPVC Conduit (Dia. 160mm) Medium Voltage Ductbank No. CCD-MV/17 (from
Installation of straight UPVC Conduit (Dia. 160mm) Medium Voltage Ductbank No. GG/D-MV/16 (from
Installation of straight UPVC Conduit (Dia. 160mm) Medium Voltage Ductbank no. CD/D-MV/03 (C/MV/
Installation of straight UPVC Conduit (Dia. 160mm) Medium Voltage Ductbank no. CD/D-MV/01 (C/MV/
Installation of straight UPVC Conduit (Dia. 160mm) Low Voltage Ductbank No. CC/D-LV/10 (C/LV/23 to
Installation of straight UPVC Conduit (Dia. 160mm) Low Voltage Ductbank No. FF/D-LV/19 (F/LV/05 to
Installation of PVC Conduit (Dia. 25mm) & Boxes for Power System (Disconnect Switch) at New Ticket
Installation of Rock and Boulder No. WRB-10 - 2nd layer (2 of 3)
Inspection of Sand Bedding under pipe for Non-Potable Water Line at Zone-C - as highlighted (Sand Fro
Inspection of Sand Bediing under pipe for Potable Water Line at Zone-C - as Highlighted (Sand From Sour
Sand Bedding for Fire Water Line at Zone-C - as highlighted (Sand From Source - SAS International)
Inspection of Sand Bedding under pipe for Heating & Chilled Water Line at Zone-(C,H) - as highlighted
Inspection of Excavation for Potable Water Line Including pit - D/PW/01, at Zone-D - as Highlighted
Inspection of Excavation for Fire Water Line Including Pit - D-F-01, D-F-02 at Zone-D - as highlighted
Inspection of Excavation for Non-Potable Water Line at Zone-D - as highlighted
Installation for LV Line Pit - L/LV/11, L/LV/12, L/LV/31, L/LV/07, L/LV/08, L/LV/06, L/LV/02, L/LV/09,
Inspection of backfilling Gravel 1st Layer (1 of 1) beside Duct Bank of Fire& Security Line @ Zone-G - as
Excavation for Storm Water Line from G-N-09 to G-N-21 at Zone-05 Including branch, Manhole MH-N-1
Inspection and compaction test for backfilling Sub-grade 2nd Layer (2 of 5) above Gravel around Manhol
Inspection and Compaction test for backfilling Sub-grade 4th Layer (4 of 5) around Manhole FW-A-3-5 -
Inspection of Excavation for RO Water Line at Zone-B - As highlighted
Inspection of backfilling Gravel 1st, 2nd and 3rd Layer (1,2,3 of 10) for Storm Water Line from MH-M-0
Inspection for Installation of Fire & Security Line Pit -L/FS/24, L/FS/25, L/FS/06, L/FS/22, L/FS/23, L/
Inspection of Excavation for Non-Potable Water Line at Zone-C - as highlighted
Inspection of Sand covering for protection of pipe for Heating and Chilled Water Line at Zone-H - As hi
Inspection of Sand Covering to protect the pipe for RO Water Line at Zone-B,F&G - as highlighted in th
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 10) in Wadi Garden (Crescent ar
Inspection of Excavation for Site Wide Irrigation Sytem Line at Zone-G - as highlighted
Inspection of Sand bedding under pipe for LV Line at Zone-G - as highlighted (Sand from Source - SAS In
Inspection of Formwork and Concrete Pouring for Beam of Seating Area 3-31 at Zone-G - As Highlighted
Inspection of Steel Reinforcement for Beam of Seating Area 3-31 at Zone-G - As Highlighted
Coordinates & Levels for Blinding under Foundation of Boundary Wall (Remaining at Entrance), at Butt
Inspection of levels for Dome of New Ticketing Booth # 7A, As per Attached Highlighted Drawing's.
Surface Preparation Prior to Water proofing for Foundation, Kicker and Walls of Water feature Pump R
Concrete Pouring for Blinding under Foundation of Boundary Wall (Remaining at Entrance), at Butterfl
Surface Preparation Prior to Damp proofing for Foundations inside New Ticketing Booths 1A to 7A, at
Steel Reinforcement For Walls of Internal Garden (1 no's at section 08), Inside Aviary Garden, As per
Concrete Pouring & Shuttering for Fountain 2 (Outer) (1 nos) Left Side, Inside Physic Garden as highli
2nd Coat Damp proofing for Pedestal Columns & Footings top of Canopy Foundations (16 no's) at Grid
1st Coat Damp proofing for Pedestal Columns & Footings top of Canopy Foundations (16 no's) at Grid
Primer Coating Prior to Damp proofing for Pedestal Columns & Footing top of Canopy Foundations (16
Excavation for Foundation of Boundary Wall (Remaining at Entrance), at Butterfly Garden, as highligh
'Warning Tape For For Irrigation ROW Mainline (200mmØ- UPVC-Class-5 ); As per High lighted Atta
Installation of Sub-Surface Drainage Pipes (Perforated 110mm Ø uPVC Class 4) at Butterfly Garden.
Excavation and Surface preparation Prior to Backfilling for Exposed Aggregate Paving Walk way area, a
' Installation of Storm Water Catch Basin Pipes (uPVC Class 4 315mm Ø) from CB(G-Q-01 to G-Q-35) at
Inspection and Compaction test for 8th Layer of Backfilllng between duct tunnel Shaft of MCPE 1 and B
Inspection and Compaction Test for 5th layer Backfilling of Isolated footing of Internal building at AX
Inspection and compaction test for 4th Layer backfilling for Four Foundation at Zone 2R Axis 02AZ-02BA
Level and Location for Blinding Under Duct Tunnel foundation of MCPE 2 , at Zone 2K, Grid 03O & 03P ,
Level and Location for North Administration Building Core Wall ,Zone 2Q , Axis Between 02AX- 02AY , Le
Level and Location for Beam at Energy Center , Axis 7-11/A ,Level 887.50 (As Highlighted)
Level and Location for Infill wall ( Inclined ) ( Outer ) at Zone 1C , Axis 01I-01J , TOC 876.00 ( As Highligh
Level and Location for Perimeter Wall ( Inner ) at Zone 1M , Axis 01AJ - 01AK , Level upto 876.00 (As Hi
Concreting for Blinding Under Duct Tunnel foundation of MCPE 2 , at Zone 2K, Grid 03O & 03P , Level 87
Steel reinforcement for RC Strip Foundation ( Inner ) at Zone 1J ,Between Axis 01AA-01AC (as highlight
Antitermite Under Blinding Under Duct Tunnel foundation of MCPE 2 , at Zone 2K, Grid 03O & 03P (As Hi
Shuttering for Blinding Under Duct Tunnel foundation of MCPE 2 , at Zone 2K, Grid 03O & 03P , Level 87
Concreting for North Administration Building Core Wall ,Zone 2Q , Axis Between 02AX- 02AY , Level upt
Steel Reinforcement for Beam at Energy Center , Axis 7-11/A ,Level 887.50 (As Highlighted)
Shuttering and Concreting for Beam at Energy Center , Axis 7-11/A ,Level 887.50 (As Highlighted)
Steel reinforcement for perimeter wall(outer sloped ) , Zone 1M , Axis Between 01AJ- 01AK , level From
Shuttering for North Administration Building Core Wall ,Zone 2Q , Axis Between 02AX- 02AY , Level upt
Shuttering for Infill wall ( Inclined ) ( Outer ) at Zone 1C , Axis 01I-01J ( As Highlighted)
Concreting for Infill wall ( Inclined ) ( Outer ) at Zone 1C , Axis 01I-01J ( As Highlighted)
Concreting for RC Strip Foundation ( Inner ) at Zone 1J ,Between Axis 01AA-01AD (as highlighted)
Shutttering for Perimeter Wall ( Inner ) at Zone 1M , Axis 01AJ - 01AK , Level upto 876.00(As Highlighted
Concreting for Perimeter Wall ( Inner ) at Zone 1M , Axis 01AJ - 01AK , Level upto 876.00(As Highlighted
Installation of UPVC Conduit (2x110mm) Low Current Ductbank (Fire & Security) Manhole (M/FS/06 to L
Installation of UPVC Conduit (2x110mm) Low Current Ductbank (TELECOM) Manhole (M/TL/07 to L/TL/21
Installation of UPVC conduit (dia. 75mm ) Low Current Ductbank (Fire & Security) and connection to
Installation of UPVC conduit (dia. 25mm) and Box for Security (VISD CAM,BUTT/CAM) at the Butterfly
Installation of UPVC conduit (dia. 25mm) and Box for Voice and Data (VISD CAM,BUTT/CAM) at the Bu
Installation of UPVC conduit (dia. 25mm) and Box for Fire Alarm (VISD CAM & Monitoring Module) at
Installation of PVC Conduit (Dia. 25mm) & Boxes for Power System (Socket Outlet, Fused Connection,
Inspection and Compaction test for 5th and 6th Layer backfilling For Infill Wall , Zone 2A , Axis 02C-02D
Surface preparation Prior to Start Cementitous Water proofing, & Stone Cladding for Infill wall ( Inner ) (
Surface preparation Prior to start cementitous Water proofing, & Stone Cladding for Infill wall ( Inner ) (
Surface preparation Prior to Start Cementitous Water proofing, & Stone Cladding for Infill wall ( Inner )
Level and Location for Mass Concrete ( 3rd Layer ) Under Foundation of Diaphragam Wall , Zone 2K , Axi
Level and Location for Mass Concrete ( 2nd Layer ) Under Foundation of Diaphragam Wall , Zone 2K , Axi
Level and Location for South Administration Building Columns and Walls , Columns ( ( C29,C30,C32,C3
Level and Location for Child Care Grade Beam , at Zone 2N ,, TOC 871.225 (As Highlighted)
Level and Location for MCPE1 ,Top Slab of Duct Tunnel , at ZONE 2M 2N ,Axis Between 02-AP to 03-V &
Concreting for Mass Concrete ( 3rd Layer ) Under Foundation of Diaphragam Wall , Zone 2K , Axis 02/AH
Shuttering for Mass Concrete ( 3rd Layer ) Under Foundation of Diaphragam Wall , Zone 2K , Axis 02/AH
Concreting for Mass Concrete ( 2nd Layer ) Under Foundation of Diaphragam Wall , Zone 2K , Axis 02/AH
Shuttering for Mass Concrete ( 2nd Layer ) Under Foundation of Diaphragam Wall , Zone 2K , Axis 02/AH
Steel Reinforcement for Child Care Grade Beam , at Zone 2N (As Highlighted)
Shuttering for MCPE1 ,Top Slab of Duct Tunnel , at ZONE 2M 2N ,Axis Between 02-AP TO 03-V & 03-2 TO
Concreting for MCPE1 ,Top Slab of Duct Tunnel , at ZONE 2M 2N ,Axis Between 02-AP to 03-V & 03-2 to
Steel Reinforcement for Cafeterias Ground Floor Slab , at ZONE 2A , Axis 02B to 02D (as highlighted)
Inspection and compaction test for 3rd Layer backfilling for Four Foundation at Zone 2R Axis 02AZ-02BA
Inspection and compaction test for 4th Layer Backfilling Under Duct Tunnel , MCPE2 at Zone 2K, Axis 02
Inspection and Compaction test for 5th Layer backfilling for Infill Wall ( Inner ) , Zone1C & 1D, Axis 01I-0
Level and Location for Infill wall ( Inner ) at Zone 2G , Axis 02X - 02Y , TOW 871.70 ( As Highlighted)
Level and Location for Diaphragm wall Slab at Zone 1E , Axis 01/M , Level Upto 869.00 (as highlighted)
Inspection of Excavation for Telecommunication Line From C/TL/25 to C/TL/50 Including Pit - C/TL/28, C/
Level and Location for Blinding Under SOG, at Zone 2N, Axis 02AR-02AS (As Highlighted)
Inspection of Excavation for Telecommunication Line From G/TL/27 to G/TL/51 Including Branch and Pit
Excavation for Fire & Security Distribution Line from C/FS/29 to H/FS/29 Including Pits - C/FS/34, H/FS/
Level and Location for Perimeter wall ( 1st Stage ) ( Outer ) Zone 1M, Axis 01AL-01AM , Level Upto 874.0
Excavation for Fire & Security Distribution Line from G/RC-FS/44 to G/RC-FS/29 Including Branch and Pit
Inspection of Blinding Concrete under LV Line Pit - E/LV/02, E/LV/01, D/LV/09, D/LV/08, L/LV/07, M
Inspection for Installation of Telecommunication Line Pit - L/TL/36, L/TL/37, L/TL/21, L/TL/28, L/TL/
Inspection of Excavation for LV Line at Zone-G including Pit - G/LV/35, G/LV/34, G/LV/33 - as highlighted
Inspection of Sand bedding under pipe for Heating & Chilled Water Line Branch at Zone-L - as highlight
Inspection of Excavation for RO Water Line branch including Pit ISC-06, ISC-05, ISC-04, POC-07 & POC-06
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 1) above Warning tape for Hea
Inspection for laying of Warning tape above Sand covering for Heating and Chilled Water Line at Zone-B
"Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 1) above Red Tiles for LV Lin
Inspection for Laying of Red Tiles and Warning Tape above sand cover for LV Line from SBC-05 to E/LV/0
Level and Location for Central Bridge Deck , at Zone 4 , Level upto 870.13 (As Highlighted)
Level and Location for Diaphragm wall ( Wall ) ( Left Side ) at Zone 1E , Axis 01P , Level Upto 873.00 (as
Shuttering for Infill wall ( Inner ) at Zone 2G , Axis 02X-02Y ( As Highlighted)
Concreting for Infill wall ( Inner ) at Zone 2G , Axis 02X & 02Y ( As Highlighted)
Steel Reinforcement for Diaphragm wall Slab at Zone 1E , Axis 01/M , Level Upto 869.00 (as highlighted
Shuttering for Diaphragm wall Slab at Zone 1E , Axis 01/M , Level Upto 869.00 (as highlighted)
Installation of Rock and Boulder No. WRB-10 - 1st layer (1 of 3)
Inspection of Excavation for Heating & Chilled Water Line Branch at Zone-L including pits L-DC-01, L-DC-
Antitermite Under Blinding Under SOG, at Zone 2N, Axis 02AR-02AS (As Highlighted)
Inspection of Excavation for Heating & Chilled Water Line at Zone-(C,H) including pit C/DC/01 - as highli
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 2) above Duct Bank of MV
Inspection of Concrete (Plain) Pouring for the Duct Bank of MV Line from E/MV/02 to E/MV/06 and Fr
Concreting for Mass Concrete ( 1st Layer ) Under Foundation of Diaphragam Wall , Zone 2K , Axis 02/AH
Inspection of Concrete (Plain) Pouring for the Duct Bank of MV Line from C/MV/01 to C/MV/29, f
Inspection of Excavation for Potable Water Line at Zone-C - as Highlighted
Excavation for Fire Water Line at Zone-C - as highlighted
Steel Reinforcement for MCPE 1 Wall , ZONE 2M 2N , Axis 03/R (as highlighted)
Inspection and Compaction Test for Backfilling Sub-Grade 1st Layer (1 of 1) Above Red Tiles for MV Li
Inspection and Compaction Test for backfilling 1st Layer (1 of 1) Above Greentiles for Fire & Security D
Inspection and Compaction Test for backfilling 1st Layer (1 of 1) Above Green Tiles for Telecommunicat
Inspection for Laying of GreenTiles and Warning tape above Sand cover for Fire & Security Distribution
Inspection for Laying of Green Tiles and warning tape above Sand cover for Telecommunication Line fr
Inspection and compaction test for backfilling Sub-grade 1st Layer (1 of 5) above Gravel around Manhol
Inspection and Compaction test for backfilling Sub-grade 3rd Layer (3 of 5) around Manhole FW-A-3-5 -
Inspection and Compaction test for backfilling Sub-grade 3rd Layer (3 of 6) above Sand covering for He
Inspection of Excavation for LV Line at Zone-G including Pit - G/LV/35, G/LV/34, G/LV/33 - as highlighted
Shuttering for Perimeter wall ( 1st Stage ) ( Outer ) Zone 1M, Axis 01AL-01AM , Level Upto 874.00 (As Hig
Concreting for Perimeter wall ( 1st Stage ) ( Outer ) Zone 1M, Axis 01AL-01AM , Level Upto 874.00 (As Hi
Surface Preparation and Primer Coating for Butress ( BOV-51 & BIV-51 ) and Diaphragm wall ( Wall ) , at
Single Layer of 4mm thick Modified Bituminous WaterProofing Membrane for Butress ( BOV-51 & BIV-51 )
Protection Layer of 4mm thick Bituminous Protection Board for Butress ( BOV-51 & BIV-51 ) and Diaphrag
Concreting for South Administration Building Columns and Walls , Columns ( C1a ) Level from 868.50 to
Concreting for Mass concrete ( 1st Layer ) ( Outer ) Under Strip footing at Zone 1J , Axis 01AA-01AC, TO
Protection Layer of 4mm thick Bituminous Protection Board for Blinding at Side of the Foundations of d
Steel Reinforcement for Diaphragm wall ( RC Foundation and Strip footing ), at Zone 1B , Axis 01F , Lev
Shuttering for Diaphragm wall ( RC Foundation and Strip footing ), at Zone 1B , Axis 01F , Level upto 86
Concreting for Infill wall at Zone 2A , between axis 02C-02D Level From 863.55 to 869.158 (as highlighte
Single Layer of 4mm thick Modified Bituminous WaterProofing Membrane Under ( Rc Footing and Strip Fo
Protection Layer of 4mm thick Bituminous Protection Board for ( Vertical Area ) Between Rc Footing and
Steel Reinforcement for Central Bridge Deck , at Zone 4 (As Highlighted)
Steel Reinforcement for MCPE 1 Wall ,Beam and Slab , ZONE 2M 2N , TOC 874.80 & 875.850 (as highli
Antitermite Under Mass Concrete Under Diaphragm Wall Foundation at Zone 4, Axis 02/AH (As Highlig
Shuttering for Diaphragm wall ( Wall ) ( Left Side ) at Zone 1E , Axis 01P , Level Upto 873.00 (as highligh
Concreting for Diaphragm wall ( Wall ) ( Left Side ) at Zone 1E , Axis 01P , Level Upto 873.00 (as highligh
Concrete Pouring & Shuttering for Lintels of Doors & Stiffner Column's for all walls at Ground Floor,
Surface Preparation Prior to Blinding under Stone Steps of Stairs (Outer 3 no's), inside Physic Garden,
Inspection for Installed Low Current Handhole of Fire Alarm & Security (MH/PG/FA/16), Inside Physic
Surface Preparation prior to Backfilling Between Boulder lines at Top Left side of Geyser, (At levels
Coordinates & Levels for Blinding under Stone Steps of Stairs (Outer 3 no's), inside Physic Garden, as
Concrete Pouring for Blinding under Foundation of Dinosaur inside Discovery Garden, as highlighted
Steel Reinforcement for Dome of New Ticketing Booth # 7A, As per Attached Highlighted Drawing's.
Steel Reinforcement for Wall of Wet Well Beside Water Feature, at Management and Maintenance
Gravel (Drainage) & Geo Textile (Filter membrane Terrain) for Tree Pits (22 no's) At Mist Garden, i
Excavation for Tree Pits (22 no's) At Mist Garden, inside Water Garden, at highlighted area in att
'Warning Tape For Non-Potable Water (Irrigation Main Line); (40, 63, 50, 75 & 110 mmØ- UPVC-Class-
'Warning Tape For Irrigation ROW Mainline (90mmØ & 160mmØ- UPVC-Class-5 ); As per High lighted
' Warning Tape Installation of Storm Water Pipes (uPVC Class 4 450mm Ø) from MH-Q-08 to MH-Q-10 at
' Gravel 3/8" Backfilling and Geotextile of Storm Water Pipes (uPVC Class 4 450mm Ø) from MH-Q-08 t
'Potable Water Pipes Sand Cover & Pipes Protection (30 cm above Pipes). As per highlighted Area in
'Fire Fighting Networks Sand Cover & Pipes Protection (30 cm above Pipes). As per highlighted Area
'Bedding of Gravel 3/8" and Geotextile Surrounding Foul Water Line for (160&110mmØ - UPVC- Class
Concrete Pouring for Blinding under Low Current Handholes of Fire Alarm & Security (MH/PG/FA/16),
Excavation and Blinding Levels for Low Current Handholes of Fire Alarm & Security (MH/PG/FA/16), In
Coordinates & Levels of Roof Slab on Site Tower 5, as per the highlighted attached Drawings.
Installation of straight UPVC Conduit (Dia. 160mm) Medium Voltage Ductbank (from Manhole no. C
Installation of straight UPVC Conduit (Dia. 160mm) Medium Voltage Ductbank (from Manhole no
Filed joint jacketing for Pre-insulated Heat & Chilled Water Pipes. Heat water pipes (dia 200m
Installation of straight UPVC Conduit (Dia. 160mm) Medium Voltage Ductbank (from Manhole no. B/M
Installed ETFE Cushions between Axis 02/Y - 02/Z (without Aluminum Caps).
Installed Base Extrusion and Base Seal between Axis 01/S - 01/T.
Excavation for Fire & Security Distribution Line from C/FS/16 to C/FS/22 and from C/FS/15 to C/FS/47 inc
Inspection of Excavation for MV Line Between C/MV/11 and D/MV/18 , and between C/MV/24 and D/MV/2
Inspection of Excavation for Telecommunication Line From C/TL/22 to C/TL/35 and From C/TL/18 to C/TL/
Sand bedding for Fire & Security Distribution Line from C/FS/24 to C/FS/29 At Zone-C - as highlighted (
Inspection of Sand Bedding Under for Telecommunication Line From C/TL/65 to C/TL/25 at Zone - C - as
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 2) above Duct Bank of MV Li
Inspection and Compaction test for backfilling Sub-grade 2nd Layer (2 of 6) above Sand covering for He
Excavation for Fire & Security Distribution Line from C/FS/24 to C/FS/29 including pits - C/FS/50, C/FS/2
Inspection of Excavation for Telecommunication Line From C/TL/65 to C/TL/25 Including pits - C/TL/30,
Inspection of Sand covering for protection of pipe for Heating and Chilled Water Line at Zone-G - As hi
Installation of Sub-Surface Drainage Pipes( Perforated110 mmØ UPVC Class 4 ) at Water Garden. As
Pre insulated Chilled pipes, ( laying ,Aligment ,Leveling and fit up) Chilled 400mmØ. From point
Installation of Potable Water Pipes (160mm Ø uPVC Class 5) at Zone C & H as per attached higlighte
Installation of Main Fire Water Pipes (250mm, 160mm Ø uPVC Class 5) at Zone C & H as per attached
Coordinates & Levels for Blinding under Foundation of Dinosaur inside Discovery Garden, as highlight
Warning Tiles & Tape above Sand Cover for Electrical Lines of Low Voltage (MH/WG/LV/34 to 35 to 36)
Concrete Pouring for Blinding under Electrical Handholes of Low Voltage (MH/WG/LV/31, 32 & 48), Ins
Installation of PVC Conduit Sleeves Passing the Concrete (3x75mm) for Low Voltage (Power System) at
Antetermite Under Blinding under Slab on Grade in Devonian Garden , in Zone 2M , Axis 02AM-AP (as
Installation of PVC Conduit (Dia. 25mm) and Boxes for Security (Card Redaer, Break Glass for Emergen
Installation of PVC Conduit (Dia. 25mm) and Boxes for Voice & Data (DATA) at Ground Floor in North
Inspection for Laying of Red Tiles and Warning Tape above the pipe for MV Line from B/MV/14 to B/MV/
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 6) above Sand covering for Hea
Inspection of Formwork and Concrete Pouring for Slab of MV Line Pit - C/MV/10, C/MV/25, H/MV/27 a
Inspection of Sand bediing under pipe for Heating and Chilled Water Line at Zone-G - As highlighted (Sto
Inspection of Backfilling Soil Mix (70%Sand, 10%Sweet Soil, 10% Organic material, 10% Perlite) for Tree P
"Inspection of Backfilling Gravel 1st Layer (1 of 1) and Geotextile for Tree Pit (406 No's) as Details D-38
Inspection for application of Base Primer and Bituminous Damp Proofing (1st & 2nd Coat) for footing and
Surface Preparation prior to start waterproofing for footing and wall of Seating Area 3-29 & 3-38 at Zone
Inspection of backfilling Gravel 2nd Layer (2 of 2) for Canopy Foundation and Column Neck of Seating A
Installation of Ligthning Arrester Rod OPR System with Tripod and Ligthning Down Conductor (25mm x
Installation of Ligthning Arrester Rod OPR System with Tripod and Ligthning Down Conductor (25mm x
Installation of Ligthning Arrester Rod OPR System with Tripod and Ligthning Down Conductor (25mm x
Installation of Ligthning Arrester Rod OPR System with Tripod and Ligthning Down Conductor (25mm x
Pre insulated Chilled pipes, ( laying ,Aligment ,Leveling and fit up) Chilled 100mmØ (E:648091.28
Inspection and Compaction test for 4th Layer backfilling for Infill Wall ( Inner ) , Zone1C & 1D, Axis 01I-0
Inspection and Compaction test for 7th Layer of backfilling under Duct Tunnel , MCPE2 at Zone 2H, Grid
Inspection and compaction test 3rd layer Backfilling above the Chid Care footing between (as Highlight
Inspection and compaction test 5th layer for Backfilling at Internal Building at Zone 2R (as highlighted)
Concreting for Blinding under SOG at North Administration Building at Zone 2R, Axis 02BA-02BC , TOC 8
Shuttering for Diaphragm wall ( Wall ) , at Zone 2M axis 02AL, , Level upto 873.50 (as highlighted)
Concreting for Diaphragm wall ( Wall ) , at Zone 2M axis 02AL, , Level upto 873.50 (as highlighted)
Antitermite Under Blinding under SOG at North Administration Building at Zone 2R, Axis 02BA-02BC (A
Shuttering for Blinding under SOG at North Administration Building at Zone 2R, Axis 02BA-02BC (As Hig
Concreting for MCPE 2 Duct Tunnel Foundation , at ZONE 2J , Axis 02AB - 02AE ,(as highlighted)
Shuttering for MCPE 2 Duct Tunnel Foundation, ZONE 2J , Axis 02AB - 02AE ,(as highlighted)
Steel Reinforcement for MCPE 2 Duct Tunnel Foundation, ZONE 2J , Axis 02AB - 02AE ,(as highlighted)
Antitermite Under Blinding for ( 3 Parts ) under Duct Tunnel Foundation at MCPE 2 , Grid 03I , 03M , 03
Shuttering for Blinding for ( 3 Parts ) under Duct Tunnel Foundation at MCPE 2 , Grid 03I , 03M , 03N ,
Concreting for Blinding for ( 3 Parts ) under Duct Tunnel Foundation at MCPE 2 ,Grid 03I , 03M , 03N , Z
Steel Reinforcement for Infill wall ( Inclined ) ( Outer ) at Zone 1C , Axis 01I-01J ( As Highlighted)
Steel Reinforcement for Infill wall ( Inner ) at Zone 2G , Axis 02X-02Y ( As Highlighted)
Steel Reinforcement for Central Bridge Abutment Walls , Zone 4 , Grid 02/AL , (As Highlighted)
Steel Reinforcement for Infill wall (inner) at zone 2A Between 02C-02D , Level from 863.55 to 869.16 ( As
Level and Location for Diaphragm wall ( Wall ) , at Zone 2M axis 02AL, , Level upto 873.50 (as highlight
Level and Location for MCPE 2 Duct Tunnel Foundation , at ZONE 2J , Axis 02AB - 02AE ,(as highlighted)
Level and Location for North Administration Building for Blinding under SOG, Axis 02BA- 02BC , ZONE 2R
' Warning Tape Installation of Storm Water Pipes (uPVC Class 4 450mm Ø) from MH-M-02 to MH-M-02
' Gravel 3/8" Backfilling and Geotextile of Storm Water Pipes (uPVC Class 4 450mm Ø) from MH-M-0
Steel Reinforcement for Beam at Energy Center , Axis 7-11/A ,Level 887.50 (As Highlighted)
Installation of Direct Buried strainght UPVC Conduit (dia.32mm straight) for Voice and Data (CAM & W
Installation of straight UPVC Conduit (Dia. 160mm) Medium Voltage Ductbank No. CCD-MV/17 (from
Installation of straight UPVC Conduit (Dia. 160mm) Low Voltage Ductbank No. GG/D-LV/16 (G/LV/34 t
Installation of straight UPVC Conduit (Dia. 160mm) Medium Voltage Ductbank No. GG/D-MV/16 (from
Installation of Rock and Boulder No. RB-258 - 4th layer (4 of 4) - As Highlighted
Installation of Rock and Boulder No. RB-258 - 3rd layer (3 of 4) - As Highlighted
Installation of Rock and Boulder No. RB-258 - 2nd layer (2 of 4) - As Highlighted
Installation of Rock and Boulder No. RB-258 - 1st layer (1 of 4) - As Highlighted
Installation of Rock and Boulder No. RB-257 - 4rd layer (4 of 4)
Installation of Rock and Boulder No. RB-257 - 3rd layer (3 of 4)
Installation of Rock and Boulder No. RB-257 - 2nd layer (2 of 4)
Installation of Rock and Boulder No. RB-257 - 1st layer (1 of 4)
Installation of Rock and Boulder No. RB-259 - 4rd layer (4 of 4)
Installation of Rock and Boulder No. RB-259 - 3rd layer (3 of 4)
Installation of Rock and Boulder No. RB-280 - 4th layer (4 of 4) - As Highlighted
Installation of Rock and Boulder No. RB-280 - 3rd layer (3 of 4) - As Highlighted
Installation of Rock and Boulder No. RB-280 - 2nd layer (2 of 4) - As Highlighted
Installation of Rock and Boulder No. RB-280 - 1st layer (1 of 4) - As Highlighted
Installation of Rock and Boulder No. RB-259 - 2nd layer (2 of 4)
Installation of Rock and Boulder No. RB-259 - 1st layer (1 of 4)
Installation of Sub-Surface Drainage Pipes (Main Line & Branches) Pipes; ( Perforated110 mmØ UPVC
Inspection of Sand bedding under pipe for Fire & Security Distribution Line from C/FS/50 to C/FS/52 At
Inspection of Sand bedding under pipe for Telecommunication Line Between C/TL/36 and C/TL/27 at Zone
'Warning Tape For ROW Mainline Including Branches (200mmØ- UPVC-Claas-5 ); As per High lighted
Inspection of Sand bedding under pipe for LV Line From C/LV/12 to C/LV/20 at Zone-C - as highlighted (
'Warning Tape For Non-Potable Water (Irrigation Main Line); (200&250 mmØ- UPVC-Claas-5 ) ; As pe
Inspection of Sand bedding under pipe for LV Line From G/LV/07 to G/LV/20 at Zone-G Including Branch
Inspection of Sand covering for protection of pipe for Heating and Chilled Water Line at Zone-G - As hi
"Inspection for backfilling Gravel 1st Layer (1 of 2) around Storm Water Line Gullies G-Q-4, G-Q-0
Inspection of Casting Concrete Encasement for Storm Water Line Branch and Surface Preperation prior t
' Installation of Storm Water Pipes (uPVC Class 4 450mm Ø) from MH-Q-08 to MH-Q-10 at Outfall Q. A
Sand Covering Layer for Protection of Fire & Security Line from C/FS/07 to C/FS/24 at Zone-C as highlig
'Bedding of Gravel 3/8" and Geotextile surrounding in Storm Water Pipes (uPVC Class 4 450mm Ø) fr
Inspection of Sand Covering Layer for Protection of Telecommunications Line from C/TL/36 to C/TL/65
Surface Preparation Prior to Damp proofing for Pedestal Columns & Footing top of Canopy Foundations
Concrete Pouring & Shuttering for Fountain 2 (Outer) (1 nos) Right Side, Inside Physic Garden as high
Concrete Pouring & Shuttering for Wall of Seat Wall (Inner) Right Side (Remaining part), Inside Physic
Concrete Pouring & Shuttering for Footing of Seat Wall (Inner) Left Side (Remaining part), Inside Phys
Concrete Pouring & Shuttering For Foundations of Internal Garden, Inside Aviary Garden, As per Highl
Coordinates & Levels for Fountain 2 (Outer) (2 nos) Right & Left Side, Inside Physic Garden as highlig
Coordinates & Levels for Wall of Seat Wall (Inner) Right Side (Remaining part), Inside Physic Garden a
Coordinates & Levels for Footing of Seat Wall (Inner) Left Side (Remaining part), Inside Physic Garden
Installation of Direct Buried strainght Upvc Conduit (dia.32mm straight) for Fire Alarm(Speaker) at th
Coordinates & Levels For Foundations of Internal Garden, Inside Aviary Garden, As per Highlighted in
Surface Preparation prior to Backfilling Between 2nd & 3rd line of boulders at Right side of Geyser, (
Installation of Direct Buried UPVC conduit (dia. 32mm straight) for Voice and Data (CAM,WIFI & FO Co
Excavation and bed preparation for sub surface drainage pipes (for trees) Surround Mist and Water Pl
Installation of Direct Buried strainght Upvc Conduit (dia.32mm) for Power (FO/Copper Converter) at t
Installation of Direct Buried strainght Upvc Conduit (dia.32mm) for Power (FO Converter) at the Disco
Installation of Direct Buried UPVC conduit (dia. 32mm straight) for Fire Alarm (Speaker & Interface Un
Installation of Direct Buried UPVC conduit (dia. 32mm straight) for Fire Alarm (Speaker) at the Physic
Installation of Direct Buried UPVC conduit (dia. 32mm straight) for Voice and Data (CAM,WIFI) at the
Installation of PVC conduit (Dia. 25mm) and for Lighting (U3 Floor luminaire, W1 AND W1/E) at Site t
Inspection for Installation of LV Line Pit - F/LV/21, F/LV/04, F/LV/24, F/LV/11, G/LV/24, G/LV/25, G/
INSPECTION FOR INSTALLATION of all RINGS (RISER) AND SLAB FOR - MH-M-02-1, MH-M-02-2 (As Highli
Installation of straight UPVC Conduit (Dia. 160mm) Medium Voltage Ductbank No. CC/D-MV/16 (from
INSPECTION FOR MANHOLE BASE INSTALLATION AND UPVC PIPE CONNECTION FOR - MH-M-02-1, MH-M-02
INSPECTION FOR INSTALLATION OF ALL RINGS (RISER) AND SLAB FOR - MH-Q-01, MH-Q-03, MH-Q-03-1
INSPECTION FOR MANHOLE BASE INSTALLATION AND UPVC PIPE CONNECTION FOR - MH-Q-01, MH-Q-03,
INSPECTION FOR INSTALLATION OF STORM WATER LINE GULLIES G-Q-02,G-Q-03, G-Q-04, G-Q-05, G-Q-06,
Inspection of Blinding Concrete under LV Line Pit - C/LV/23, C/LV/24, C/LV/13, C/LV/29, C/LV/22, C/LV/0
Inspection of Blinding Concrete Under Fire and Security Line Pit - C/FS/29, C/FS/26, C/FS/25, C/FS/49,
Inspection of Blinding Concrete Under Telecom Line Pit - C/TL/56, C/TL/20, C/TL/19, C/TL/22, C/TL/23, C/
"Surface Preparation Prior to Start Backfilling for Storm Water Line Gullies G-Q-4, G-Q-09, G-Q-02,
Inspection of Concrete (Plain) Pouring for the Duct Bank of MV Line from D/MV/19 to D/MV/06 at Zone-
Inspection for Laying of Warning tape above Sand Covering for Non-Potable Water Line at Zone-G - as h
Installation of PVC Conduit (Dia. 25mm) and Boxes for Fire Alarm (Flashing Beacon) at Ground Floor in
Inspection of Sand Covering to protect the pipe for Non-Potable Water Line at Zone-G - as highlighted
Installation of PVC Conduit (Dia. 25mm) and Boxes for Voice & Data (DATA & Telephone) at Ground Fl
Installation of straight UPVC Conduit (Dia. 160mm) Low Voltage Ductbank No. MM/D-LV/03 (M/LV/03
Installation of straight UPVC Conduit (Dia. 160mm) Low Voltage Ductbank No. LL/D-LV/16 (L/LV/11 to
Steel Reinforcement for Fountain 2 (Outer) (1 nos) Left Side, Inside Physic Garden as highlighted area
Steel Reinforcement for Footing & Wall of Seat Wall (Inner) Left Side (Remaining part), Inside Physic
Inspection for Laying of Warning Tape above Sand covering for Heating and Chilled Water Line at Zone-G
Inspection of Sand covering for protection of pipe for Heating and Chilled Water Line at Zone-G - As hi
Inspection for laying of Warning tape above Sand covering for Heating and Chilled Water Line at Zone-H
Installation of Potable Water Pipes (160mm Ø uPVC Class 5) at Zone C & H as per attached higlighte
Level and Location for South Administration Building Columns and Walls , ( Columns ( C8 , C9 , C10, C1
Level and Location for Infill wall ( Inner )at Zone 1E , Axis 01P , Level upto 869.00 (As Highlighted)
Level and Location for Blinding ( 3rd Part ) under Duct Tunnel Foundation at MCPE 2 , Axis 02Z - 02AA ,
'Installation of Main Foul Water Pipe Drainage line (110mm Ø uPVC Class 4) including Pipe Sleeve (
Level and Location for Diaphragm wall Slab ( mid Span ) at Zone 1E , Axis 01P , TOC 869.00 (As Highligh
'Installation of Main Foul Water Soak Away Pipe (110mm Ø uPVC Class 4) from Soak Away to MH(FW-A-
"Shuttering for Infill wall ( Inner )at Zone 1E , Axis 01P , Level upto 869.00 (As Highlighted) "
"Concreting for Infill wall ( Inner )at Zone 1E , Axis 01P , Level upto 869.00 (As Highlighted) "
Concreting for Infill wall ( Inner ) at Zone 2F , Axis 02S - 02T , TOC 876.00 (As Highlighted)
'Bedding of Gravel 3/8" and Geotextile Surrounding Main Foul Water Pipe Drainage line (110mm Ø uP
Concreting for Diaphragm wall ( RC Foundation and Strip footing ), at Zone 1B , Axis 01F , Level upto 86
'Bedding of Gravel 3/8" and Geotextile Surrounding Main Foul Water Soak Away Pipe (110mm Ø uPVC
Concreting for Rc Strip Footing ( Outer ) ,at Zone 1C , Axis 01I-01J (as highlighted)
Steel reinforcements for Diaphragm wall Slab ( mid Span ) at Zone 1E , Axis 01P , TOC 869.00 (As Highl
Shuttering for Diaphragm wall Slab ( mid Span ) at Zone 1E , Axis 01P , TOC 869.00 (As Highlighted)
Concreting for Diaphragm wall Slab ( mid Span ) at Zone 1E , Axis 01P , TOC 869.00 (As Highlighted)
Shuttering for Infill wall (outer) ( Inclined Wall ) at Zone 1F , Axis 01R-01S (as highlighted)
Concreting for Infill wall (outer) ( Inclined Wall ) at Zone 1F , Axis 01R-01S , Level upto 876.00 (as highli
Steel reinforcement for South Administration Building Columns ( C 21 ) at Zone 2C, Axis 02I-02J Level f
Concreting for Diaphragm wall Slab ( 3rd Span ) at Zone 1E , Axis 01P , TOC 869.00 (As Highlighted)
Installation of Main Fire Water Pipes (250mm, 160mm Ø uPVC Class 5) at Zone C & H as per attached
Installation of Mechanical Pipe Sleeve (110mm Ø uPVC Class 4) for Drain Pipe at Crescent 2 Zone-2R
Sand Cover & Protection for Electrical Lines of Low Voltage (MH/WG/LV/34 to 35 to 36), at Geyser Gar
Excavation & Surface preparation for Foundation of Dinosaur inside Discovery Garden, as highlighted
1st Layer Gabions Layout Installation along Boundary wall Inner side, (Between F.O.H and B.O.H and P
Gravel (Drainage) & Geo Textile (Filter membrane Terrain) for Landscaping area's and Planted Beds
Excavation for Landscaping area's and Planted Beds, Between Mist and Geyser Gardens and at Bottom
Level and Location for Mass Concrete ( 1st Layer ) Under Foundation of Diaphragam Wall , Zone 2K , Ax
Level and Location for South Administration Building Columns and Walls ( C1 , C1a , C2 , C3 , C4 , C5 ,
Level and Location for Large mosque upper second flooor ( inverted beams) at zone 1G axis B-E, 1-6, Lev
Level and Location for Perimeter Wall ( 1st Stage ) ( Outer ) at Zone 1M , Axis 01AK-01AL , Level upto
Excavation and Surface Preparation Under Diaphragm Wall Foundation , at Zone 2K , Axis 02AH (as hig
Shuttering for Large mosque upper second flooor ( inverted beams) at zone 1G axis B-E, 1-6, Level upto
Steel Reinforcement for South Administration Building Columns and Walls , ( Columns ( C51, C52 ) , Wa
Shuttering for Mass Concrete ( 1st Layer ) Under Foundation of Diaphragam Wall , Zone 2K , Axis 02/AH
Surface Preparation and Primer Coating for Under Diaphragm Wall ( Rc Footing and Strip footing ) , at Zo
Shuttering for Perimeter Wall ( 1st Stage ) ( Outer ) at Zone 1M , Axis 01AK-01AL , Level upto 874.05 (
Concreting for Perimeter Wall ( 1st Stage ) ( Outer ) at Zone 1M , Axis 01AK-01AL , Level upto 874.05 (
Installation of UPVC Conduit Low Current Ductbank (TELECOM) Manhole (4x110mm - C/TL/36 to C/TL/3
Installation of Rock and Boulder No. WRB-47 - 1st layer (1 of 5) - As Highlighted
"Inspection of Grouting (Horizontal & Vertical Joints) for Rock Boulder - RB-262 for All Layers"
"Inspection of Grouting (Horizontal & Vertical Joints) for Rock Boulder - RB-264 for All Layers"
Inspection of Blinding Concrete under LV Line Pit - G/LV/19, G/LV/12, G/LV/55, G/LV/07 at Zone-G - as h
Inspection of Excavation for Site Wide Irrigation Sytem Line at Zone-G - as highlighted
Inspection of Sand covering for protection of pipe for Heating and Chilled Water Line at Zone-B&G - As
Inspection of Sand covering for protection of pipe for Heating and Chilled Water Line at Zone-H - As hi
Installation of UPVC Conduit (2x110mm) Low Current Ductbank (Fire & Security) Manhole (C/FS/07 to C
Installation of stub-up and Direct Buried strainght Upvc Conduit (dia.32mm) for Ligthing at the Physic
Installation of PVC Conduit (Dia. 25mm) & Boxes for Lighting System (Lighting Switch) at Ground Floor
Installation of PVC Conduit (Dia. 25mm) & Boxes for Power System (Socket Outlet, Fused Connection,
Pre insulated Chilled pipes, ( laying ,Aligment ,Leveling and fit up) Chilled 400mmØ A7 from poin
Installation of straight PVC Conduit (Dia.25mm) for Security (CAM) at Roof Floor Site Tower No. 4 as
Installation of straight PVC Conduit (Dia. 25mm) for Fire Alarm (Smoke Detector ,Speaker , Mounted
Installation of straight PVC Conduit (Dia.25mm) for Voice and Data (CAM) at Roof Floor Site Tower No
Gravel (Drainage) for Landscaping area's at Left side of Water Play Garden, inside Water Garden, at
Stack Boulders Installed Layers at levels +880.50, Behind Wing Wall of SBC 07, at Wadi # 2, Inside Wa
Inspection of Formwork and Concrete Pouring for Slab of MV Line Pit - C/MV/28, D/MV/12 at Zone-C&D
Inspection of Steel Reinforcement for Slab of MV Line Pit - C/MV/28, D/MV/12 at Zone-C&D - As Highl
Soil Preparation under Boulder No. WRB-60
Soil Preparation under Boulder No. WRB-19
Soil Preparation under Boulder No. WRB-18
Stack Boulders Installed Layers at levels +876.00, 876.40, 876.80, 877.20, 877.60, 878.10, 878.50 &
Stack Boulders Installed Layers at levels +875.60 & 876.00, Behind Wing wall of SBC 08 (Boundary wal
Excavation and Soil Preparation prior to start backfilling Layers forSecurity Perimeter Road (South), S
Rough coat (Spatter Dash) Prior to Plastering for Walls (All sides) of Toilets & Meeting Room, at Gri
Concrete Pouring & Shuttering for Walls & Slab of Water feature Pump Room along Boundary wall, at B
Steel Reinforcement For Foundations of Internal Garden, Inside Aviary Garden, As per Highlighted in
Excavation for Landscaping area's at Left side of Water Play Garden, inside Water Garden, at highl
Excavation for Fire & Security Distribution Line from C/FS/50 to C/FS/52 At Zone-C Including Pit C/FS/5
Excavation for Telecommunication Line Between C/TL/36 and C/TL/27 at Zone-C Including Pit C/TL/38,
Inspection of Excavation for LV Line From G/LV/07 to G/LV/20 at Zone-G Including Branch and Pits - G/
Inspection of Excavation for LV Line From C/LV/12 to C/LV/20 at Zone-C including Pit - C/LV/12, C/LV/22
Inspection of Gravel layer Backfilling (50cm ht) for Water Feature Lines connecting to Decant sump D
Inspection of 3rd Layer Gravel Backfilling (30cm ht) Surround the Decant Sump-D4 Inside Water Play
Inspection of Excavation for LV Line From C/LV/02 to C/LV/17 at Zone-C Including Branch and Pits - C/
Inspection of Gravel layer Backfilling (50cm ht) for Water Feature Over flow Line (Pipes dia 300mm)
Inspection and compaction test of sub-grade backfilling layer (1 of 3) for the Duct Bank of MV Line f
Surface preparation prior to start waterproofing and waterproofing for the Duct Bank of MV Line fr
Inspection of Concrete (Plain) Pouring for the Duct Bank of MV Line from D/MV/18 to D/MV/01 at Zone-
Surface Preparation Prior to Start Backfilling Gravel around Manhole FW-A-4 - as Highlighted
Inspection of Excavation for Heating & Chilled Water Line at Zone-H including pit H/DC/05, H/DC/06, H
Inspection and Compaction test for backfilling sub-grade 1st Layer (1 of 2) for Storm Water Line f
Excavation for Fire & Security Distribution Line At Zone-C&D Including Pit C/FS/03, C/FS/02, C/FS/39, C
Excavation for Telecommunication Line at Zone-C&D Including Pit C/TL/14, C/TL/01, C/TL/02, C/TL/15, C
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 2) above Warning Tape for Hea
Inspection of Laying Warning Tape above Sand covering for Heating and Chilled Water Line at Zone-G -
Warning Tiles & Tape above Sand Cover for Electrical Lines of Emergency (MH/PG/EM/16-17) and Low
Inspection of Sand Covering Layer for Protection of MV Line from B/MV/05 to B/MV/14 at Zone-B - as h
Inspection of 7th layer Gravel Backfilling (50cm ht) surround the Foundation & Wall of Wet Well F, In
Inspection and Compaction test for backfilling Sub-grade 3rd Layer (3 of 5) around MV Line Pit G/MV/07
Inspection and Compaction test for backfilling Sub-grade 5th Layer (5 of 5) around MV Line Pit C/MV/
Inspection of 9th layer Gravel Backfilling (50cm ht) surround the Foundation & Wall of Wet Well E, In
Inspection of Formwork & Concrete pouring for wall of MV Line Pit - C/MV/28, E/MV/08 & E/MV/09 at
Excavation and Bed preparation for Sub Suface Lines for Palm Trees (110mm Drain pipes) At both sides
Soil Preparation prior to start backfilling in Wadi Garden (Crescent area) as highlighted .
Inspection & Compaction tests of 1st Layer (Sub-grade) Backfilling for Plantation areas inside Plante
Excavation and Blinding Levels for Electrical Handholes of Low Voltage (MH/WG/LV/31, 32 & 48), Insi
Coordinates & Levels for Walls & Slab of Water feature Pump Room along Boundary wall, at Butterfly
Coordinates & Levels for Footing of Seat Wall (Inner) Right Side (Remaining part), Inside Physic Garde
Installation of Infill Walls Mechanical Pipe Sleeves uPVC Class-4, 110mm Ø (PW, NPW, FF & FW) & 160
'Warning Tape For Non-Potable Water (Irrigation Main Line); (200 mmØ- UPVC-Class-5 ) ; As per Hig
Inspection and Compaction test for 8th Layer of Backfilllng between duct tunnel Shaft of MCPE 1 and B
Inspection and Compaction test for 5th and 6th Layer backfilling For Infill Wall , Zone 2A , Axis 02C-02D
Inspection and Compaction test for 3rd and 4th Layer backfilling for Infill Wall ( Inner ) , Zone1C & 1D, A
1st layer Block Work Laying for Retaining Block Wall at Zone 2Q , Between Axis 02AX-02AY , 02AY-02AZ (
Level and Location for Infill wall ( Outer ) at Zone 1E , Axis 01P , Level upto 869.00 (As Highlighted)
Shuttering for Perimeter Wall ( 2nd stage ) ( Outer ) , at Zone 1L, Axis 01AH-01AI , Level Upto 873.8 (As
Surface Preparation and Primer Coating for Footing and Grade Beam at Energy Center , Axis 4-6/A-C (A
Surface Preparation and Primer Coating for North Administration Building for Walls ( W1 & W2 )at Zone
Protection Layer of 4mm thick Bitminnous Protection Board For North Administration Building for Column
Surface Preparation and Primer Coating for Top of Pile Cap ( BII-BIV 13 , BII-BIV 14 , BII-BIV 15 ) ,at Zone
Single Layer of 4mm thick Modified Bituminous WaterfProofing Membrane or Top of Pile Cap ( BII-BIV 13 , B
Installation of straight UPVC Conduit (Dia. 160mm) Medium Voltage Ductbank No. DD/D-MV/06 (from
Protection Layer of 4mm thick Bituminous Protection Board for Top of Pile Cap ( BII-BIV 13 , BII-BIV 14 , B
Installation of straight UPVC Conduit (Dia. 160mm) Medium Voltage Ductbank No. EE/D-MV/05 (fro
Surface Preparation and Primer Coating for Infill Wall ( Inner ) ,at Zone 1D , Axis 01J- 01K(as highlighted
Installation of straight UPVC Conduit (Dia. 160mm) Medium Voltage Ductbank No. EE/D-MV/02 (fro
Installation of straight UPVC Conduit (Dia. 160mm) Low Voltage Ducts (Submain Cables) in the Prome
Concreting for Infill wall ( Outer ) at Zone 1E , Axis 01P , Level upto 869.00 (As Highlighted)
Two Coats of Bituminous Damp Proof Coating for North Administration Building for Columns and Sides o
Two Coats of Bituminous Damp Proof Coating for Footing and Grade Beam at Energy Center , Axis 4-6/A
Two Coats of Bituminous Damp Proof Coating for North Administration Building for Walls ( W1 & W2 )at
Two Coats of Bituminous Dam Proof Coating For North Administration Building for Columns ( C2 , C3 , C6
"Shuttering for Infill wall ( Outer ) at Zone 1E , Axis 01P , Level upto 869.00 (As Highlighted) "
Steel Reinforcement for Diaphragm wall ( Wall ) , at Zone 1E , Axis 01M , Level from 869.00 - 877.00 (as
Surface Preparation and Primer Coating for North Administration Building for Columns and Sides of Fou
Protection Layer of 4mm thick Bituminous Protection Board for North Administration Building for Walls
Inspection and compaction test for 4th Layer Backfilling Under Duct Tunnel , MCPE2 at Zone 2K, Axis 02
Level and Location for Infill wall (outer) ( Inclined Wall ) at Zone 1F , Axis 01R-01S, Level 876.00 (as high
Level and Location for RC Strip Foundation ( Inner ) at Zone 1J ,Between Axis 01AA-01AD (as highlighte
Steel Reinforcement for RC Strip Foundation ( Inner ) at Zone 1J ,Between Axis 01AA-01AD (as highlight
Shuttering for RC Strip Foundation ( Inner ) at Zone 1J ,Between Axis 01AA-01AD (as highlighted)
Concreting for RC Strip Foundation ( Inner ) at Zone 1J ,Between Axis 01AA-01AD (as highlighted)
Installation of PVC Conduit (Dia. 25mm) and Boxes for Voice & Data (DATA & Telephone) at Ground Fl
Installation of PVC Conduit (Dia. 25mm) and Boxes for Fire Alarm (Flashing Beacon) at Ground Floor F
Concreting for South Administration Building Columns and Walls , ( Columns ( C10, C11, C12 , C13 , C15,
Steel Reinforcement for Diaphragm wall ( Wall ) , at Zone 2M axis 02AL, , Level upto 873.50 (as highligh
Steel Reinforcement for North Administration Building Core Wall ,Zone 2Q , Axis Between 02AX- 02AY ,
Installation of PVC Conduit (Dia. 25mm) and Boxes for Voice & Data (DATA & Telephone, DATA for TV
Single Layer of 4mm thick Modified Bituminous WaterProofing Membrane for Infill Wall ( Inner ) ,at Zon
Protection Layer of 4mm thick Bituminous Protection Board for Infill Wall ( Inner ) ,at Zone 1D , Axis 01
Surface Preparation and Primer Coating for Infill Wall ( Inner ),at Zone 1C , Axis 01I-01J , Level 867.5 (
Single Layer of 4mm thick Modified Bituminous WaterProofing Membrane for Infill Wall ,at Zone 1C , Axis
Protection Layer of 4mm thick Bituminous Protection board for Infill Wall ( Inner ) ,at Zone 1C , Axis 01I
Installation of PVC Conduit (Dia. 25mm) and Boxes for Fire Alarm (Flashing Beacon, Break glass) at G
Installation of UPVC Conduits (Dia. 110mm) for Low Current (TC) in the Promenade & Canopies Cresce
Single Leyer of 4mm thick Modified Bituminous WaterProofing Membrane for Infill Wall ( Inner ) ,at Zone
Protection Layer of 4mm thick Bituminous Protection Board for Infill Wall ( Inner ) ,at Zone 1D , Axis 01
Surface Preparation and Primer Coating for Infill Wall ( Inner ) ,at Zone 1D , Axis 01K- 01L , Level 866.5
Steel reinforcements for Cafeteria for SOG undercroft , Zone 2A Axis 02A-02B (As Highlighted )
Concreting for Cafeteria Staicase (riser and Landing) Zone 2A Axis 02B from 863.45 to 865.118 (as highli
Steel reinforcements for Strip footing Zone 1K Axis 01AE-01AF ( As highlighted)
Steel reinforcement and Shear connector for Infill Wall Beam at Zone 2H, Axis 02AA , TOC 874.92 (as hig
Level and Location for Diaphragm wall ( RC Foundation and Strip footing ), at Zone 1B , Axis 01F , Level
Sand Cover & Protection for Electrical Lines of Emergency (MH/PG/EM/16-17) and Low Voltage (MH/PG
Concrete Pouring for Blinding under Electrical Handholes of Low Voltage (MH/WG/LV/31, 32 & 48), Ins
Surface Preparation prior to Water Proofing for Wall & Foundation (Inner & Outer) Surfaces of Decan
Surface Preparation prior to Water Proofing for Wall & Foundation (Inner & Outer) Surfaces of Decan
Sand Cover & Protection for Water Feature & Over flow Lines (Pipes dia 160, 200, 250 & 300mm) from
Single Layer 4mm thk Modified Bituminous Waterproofing Membrane for Wall (Outer side) of Fountain (
Solvent Base Primer Coating prior to Membrane Waterproofing for Wall (Outer side) of Fountain (3), i
Protection Layer of 4 mm Thk. Bituminous Protection Board for External Surfaces of Wet Well F (All Si
Concrete Pouring & Shuttering for Footing of Seat Wall (Inner) Right Side (Remaining part), Inside Ph
Concrete Pouring & Shuttering for Dome of New Ticketing Booth # 6A, As per Attached Highlighted D
Inspection of levels for Dome of New Ticketing Booth # 6A, As per Attached Highlighted Drawing's.
Installation of Low Voltage Ductbank UPVC Conduit (75mm) in between Manhole (TG/N/LV-03 & Trench,
Pre insulated Heat Fittings 200mmØ , ( laying ,Aligment ,Leveling and fit up) For points (E:64800.
Pre insulated Chilled Water pipes, (100 mmØ) ( laying ,Aligment ,Leveling and fit up) From Point (E
Pre insulated Heat & Chilled pipes, (150Ø, 200Ø,400mmØ) ( laying ,Aligment ,Leveling and fit up)
Inspection for Installation of Stone Cladding without Copping for Seating Area 3 - 30 at Zone-K (As Highl
Inspection for Installation of Stone Cladding without Copping for Seating Area 3 - 27 at Zone-K (As Highl
Level and Location for Rc Foundations of Central Bridge Abutment , Grid 02AL , Zone 4 (As Highlighted)
Level and Location for Neck Columns at Energy Center , Axis 4-6/A-B , 12-13/A (As Highlighted)
Level and Location for Diaphragm wall ( Beam ) , at Zone 1E Axis 01M , Level Upto 869.00 (as highlighte
Level and Location for Plain Concrete Under Diaphragam Wall Strip Footing , Zone 1C , Axis 01G , Level
Level and Location for Diaphragm wall (inclined)(left side) , Zone 1E Axis 01M (as highlighted)
"Inspection for Installation of Pit and Slab for MV Line Pit - C/MV/11, C/MV/36, C/MV/39, C/MV/
Inspection and Compaction test for 2nd Layer Under Duct Tunnel , MCPE2 at Zone 2K, Grid 03/N (as hig
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 3) above Duct Bank of MV Li
Inspection and Compaction test for 5th Layer Under Duct Tunnel , MCPE2 at Zone 2K , Grid 03/M (as high
Inspection and Compaction test for backfilling sub-grade 2nd Layer (2 of 2) for Storm Water Line from
Steel Reinforcement for Rc Foundations of Central Bridge Abutment , Grid 02AL , Zone 4 (As Highlight
Shuttering for Rc Foundations of Central Bridge Abutment , Grid 02AL , Zone 4 (As Highlighted)
Concreting for Rc Foundations of Central Bridge Abutment , Grid 02AL , Zone 4 (As Highlighted)
Inspection and Compaction test for backfilling Sub-grade 2nd Layer (2 of 5) around MV Line Pit G/MV/07
Shuttering and Concreting for Neck Columns at Energy Center , Axis 4-6/A-B , 12-13/A (As Highlighted)
Inspection and Compaction test for backfilling Sub-grade 1st and 2nd Layer (1& 2 of 5) around Manhole
Primer Coating and First Coat of DamProof Coating for Footing , Beam and Blockwork ( Outer Side ) at E
"Inspection of backfilling Gravel 1st & 2nd Layer (1&2 of 2) around Manhole FW-A-3-4 - as Highlighted (
Surface Preparation prior to start backfilling for Parking Area CPG @ Zone-B - as highlighted
"Steel Reinforcement for Infill wall at Zone 1E , Axis 01P (As Highlighted) "
Shuttering for Diaphragm wall ( Beam ) , at Zone 1E Axis 01M , Level Upto 869.00 (as highlighted)
Concreting for Diaphragm wall ( Beam ) , at Zone 1E Axis 01M , Level Upto 869.00 (as highlighted)
Antitermite under Plain Concrete Under Diaphragam Wall Strip Footing , Zone 1C , Axis 01G (as highlig
Shuttering for Plain Concrete Under Diaphragam Wall Strip Footing , Zone 1C , Axis 01G , Level Upto 868
Concreting for Plain Concrete Under Diaphragam Wall Strip Footing , Zone 1C , Axis 01G , Level Upto 868
Installation of Sub-Surface Drainage Pipes (Main Line & Branches) Pipes; ( Perforated110 mmØ UPVC
' Warning Tape Installation of Storm Water Pipes (PP & UPVC) 600mm Ø & 400mm Ø, from (MH-Q-06
' Gravel 3/8" Backfilling and Geotextile of Storm Water Pipes (PP & UPVC) 600mm Ø & 400mm Ø, f
Filed joint jacketing for Pre-insulated Heat Water Pipes (dia 150mmØ) From point (E:647805.600
Filed joint jacketing for pre-insulated Heat Water Pipes (dia 200mmØ) From point (E:648007.484 N
Inspection & Compaction tests of Single Layer (Sub-Base) Backfilling for Low Current Lines (MH/PG/L
Inspection & Compaction tests of Single Layer (Sub-Base) Backfilling for Electrical Lines of Emerge
Inspection of 2nd layer Gravel Backfilling (50cm ht) for Sub Surface Drainage Pipes (dia 160 & 110mm
Inspection of 1st layer Gravel Backfilling (50cm ht) for Sub Surface Drainage Pipes (dia 160 & 110mm
Inspection of 2nd layer Gravel Backfilling (50cm ht) for Sub Surface Drainage Pipes (dia 110 mm PP) (
Inspection of 1st layer Gravel Backfilling (50cm ht) for Sub Surface Drainage Pipes (dia 110 mm PP) (f
Gravel (Drainage) for Planter Boxes Between boulders at Top Side of Water Play Garden, Inside Water
Coordinates & Levels of Roof Slab on Site Tower 5, as per the highlighted attached Drawings.
'Installation of Foul Water Pipes (uPVC Class 4, 315mm Ø) from (FW-A-3-6) to (FW-A-3-6.1) Outfall A.
'Bedding of Gravel 3/8" and Geotextile Surrounding Foul Water Pipes (uPVC Class 4, 315mm Ø) from (F
Level and Location for Footing and Grade Beam at Energy Center , Axis 3-6/H-K Level upto 871.70 (As H
Level and Location for Infill Wall ( 2nd stage ) ( Outer ) , at Zone 1L, Axis 01AH-01AI , Level Upto 873.8 (
Level and Location for Strip Foundation ( Inner ) at Zone 1M, Axis 01AK-01AL (As Highlighted )
' Installation of Storm Water Pipes (uPVC Class 4 450mm Ø) from MH-M-02 to MH-M-02-01 & MH-M-02-
Inspection for Casting the Blinding Concrete under the Manhole MH-M-02-01 & MH-M-02-02 - as Highli
Level and Location for Anchor bolt PG 430-50-70, PF 430-70-70 under POT BEARING at CENTRAL BRIDGE
'Bedding of Gravel 3/8" and Geotextile surrounding in Storm Water Pipes (uPVC Class 4 450mm Ø)
Inspection for Casting the Blinding Concrete under the Gullies G-Q-01, G-Q-02, G-Q-03, G-Q-04, G-
Inspection for Casting the Blinding Concrete under the Manhole MH-Q-01, MH-Q-02, MH-Q-03, MH
Inspection of Excavation for MV Line Pits E/MV/06 & E/MV/10 - as highlighted in attached drawings
Inspection of Blinding Concrete under LV Line Pit - G/LV/15, G/LV/33, G/LV/34, G/LV/35 at Zone-G - as h
' Warning Tape Installation of Storm Water Pipes (PP & UPVC) 800mm Ø, 450mm Ø, from MH-Q-01 to
Inspection of Blinding Concrete under MV Line Pits E/MV/06 & E/MV/10 - as highlighted
Inspection and compaction test for 3rd Layer Backfilling Under Duct Tunnel , MCPE2 at Zone 2K, Axis 02
Inspection for Installation of Slab for MV Line Pit - C/MV/14 at Zone-C - As Highlighted
Inspection and Compaction test for 1st and 2nd Layer backfilling for Infill Wall ( Inner ) , Zone1C & 1D, A
Inspection of Blinding Concrete under LV Line Pit - G/LV/39, G/LV/41 at Zone-G - as highlighted
' Gravel 3/8" Backfilling and Geotextile of Storm Water Pipes (PP & UPVC) 800mm Ø, 450mm Ø, from
Inspection and compaction test for 2nd Layer backfilling for Four Foundation at Zone 2R Axis 02AZ-02BA
Inspection of Sand bedding under pipe for LV Line at Zone-G - as highlighted (Sand from Source - SAS In
Inspection of Sand bedding under pipe for Fire & Security Distribution Line from G/FS/37 to L/FS/04 at
Inspection and compaction test for 3rd Layer backfilling for Strip footing ( Outer ) , Zone1K , Axis 01AD-
Inspection of Sand bedding under pipe for Telecommunication Line from G/TL/23 to L/TL/02 at Zone-G,K,
Inspection of Sand bedding under pipe for Fire & Security Distribution Line from C/FS/26 to C/FS/06 At
Steel Reinforcement for Footing and Grade Beam at Energy Center , Axis 3-6/H-K (As Highlighted)
Inspection of Sand bedding under pipe for Telecommunication Line from C/TL/68 to C/TL/25 at Zone-C -
Shuttering and Concreting for Footing and Grade Beam at Energy Center , Axis 3-6/H-K Level upto 871.
Concreting for Strip Foundation ( Inner ) at Zone 1M, Axis 01AK-01AL (As Highlighted )
"Inpection of Casting Concrete for Short Piece & Surface Preperation prior to start waterproofing and
Shuttering for Strip Foundation ( Inner ) at Zone 1M, Axis 01AK-01AL (As Highlighted )
"Inpection of Casting Concrete for Short Piece & Surface Preperation prior to start waterproofing and
Steel Reinforcement for Strip Foundation ( Inner ) at Zone 1M, Axis 01AK-01AL (As Highlighted )
Surface Preparation Prior to Start Backfilling Gravel around Manhole FW-A-3-5, FW-A-3-4 - as Highlight
Steel Reinforcement for Diaphragm wall ( Wall ) ( Left Side ) at Zone 1E , Axis 01P , Level Upto 873.50 (a
Sand Covering Layer for Protection of Fire & Security Line from D/FS/10 to SBC-05 at Zone-D as highlig
Concreting for Plain Concrete Under Footing ( only ) of Diaphragam Wall , Zone 1C , Axis 01G (as highlig
Inspection of Sand Covering Layer for Protection of Telecommunications Line from D/TL/06 to SBC-05 at
Antitermite under Plain Concrete Under Footing ( only ) of Diaphragam Wall , Zone 1C , Axis 01G , Leve
Inspection of Sand Covering for protection of pipe for LV Line from D/LV/07 to SBC-05 at Zone-D - as hi
Inspection and Compaction test for backfilling Sub-grade 2nd Layer (2 of 2) for Telecommunication and
Protection Layer of Geotextile and Screed Under RC Strip footing ( Outer ) at Zone 1J ,Between Axis 01
Inspection and Compaction test for backfilling sub-grade 1st Layer (1 of 2) for Storm Water Line fr
Single Layer of 4mm thick Modified Bituminous WaterProofing Membrane Under RC Strip footing ( Outer
Inspection of Sand Covering to protect the pipe for RO Water Line at Zone-C - as highlighted (Sand from
Inspection for application of Base Primer and Bituminous Damp Proofing (1st & 2nd Coat) for Beam of S
Surface Preparation and Primer Coating Under RC Strip footing ( Outer ) at Zone 1J ,Between Axis 01AA
"Surface Preparation prior to start waterproofing for Beam of Seating Area 3-21, 3-22, 3-26, 3-30 at Zo
Concreting for Infill Wall ( 2nd stage ) ( Outer ) , at Zone 1L, Axis 01AH-01AI , Level Upto 873.8 (As Highl
Steel Reinforcement for South Administration Building Columns and Walls , ( Columns ( C38, C39 , C40 , C
Concreting for Diaphragm wall ( RC Foundation and Strip footing ), at Zone 1B , Axis 01F , Level upto 86
Installation of UPVC conduit (dia. 75mm) Low Current Ductbank (TELECOM) in between Manholes (TGT/L
Installation of UPVC conduit (dia. 75mm) Low Current Ductbank (Fire & Security) in between Manho
Surface Preparation Prior to Water proofing for Foundation, Kicker and Walls of Cabin Room, ETFE P
Concrete Pouring & Shuttering for Roof Slab on Site Tower 5, as per the highlighted attached Drawing
Steel Reinforcement for Footing & Wall of Seat Wall (Inner) Right Side (Remaining part), Inside Physi
Steel Reinforcement for Roof Slab with Upstand and Parapet walls at Roof and 1st Floor stairs, at Sit
Inspection and Compaction test for single layer sub-base backfilling above gravel backfilling at botto
Excavation for Low Current Lines of Fire Alarm & Security (MH/PG/FA/15-16), Inside Physic Garden as
Protection Layer of 4 mm Thk. Bituminous Protection Board for External Surfaces of Wet Well E (All Si
Single Layer 4mm thk. Modified Bitumenous Water proofing Membrane for External Surfaces of Wet Well
Solvent Base Primer Coating prior to Membrane Water proofing for External Surfaces of Wet Well E (Al
Single Layer 4mm thk. Modified Bitumenous Water proofing Membrane for External Surfaces of Wet Well
Solvent Base Primer Coating prior to Membrane Water proofing for External Surfaces of Wet Well F (Al
Plaster Guide Points & Accessories Prior to Rough coat of Plastering for Walls (All sides) of Toilets
Steel Reinforcement for Dome of New Ticketing Booth # 6A, As per Attached Highlighted Drawing's.
Inspection & Compaction tests of Sub-Base Layer Backfilling prior to Blinding of Cage 2 & 3 of Interna
Inspection of Installed Thrust Blocks for Irrigation Line (110 & 160mm) at bottom Right side of Gey
Inspection of 3rd layer Gravel Backfilling (50cm ht) for sub surface drainage pipes (for trees) at bott
Inspection of 2nd layer Gravel Backfilling (50cm ht) for sub surface drainage pipes (for trees) at bott
Inspection of 1st layer Gravel Backfilling (50cm ht) for sub surface drainage pipes (for trees) at bott
Inspection of Single layer Gravel Backfilling (20cm ht) for sub surface drainage pipes (for trees) bet
Inspection & Compaction tests of 1st Layer (Sub-grade) Backfilling for Plantation area inside Planted
Warning Tiles & Tape above Sand Cover for Low Current Lines (MH/PG/LC/1-2 & 16-18-19) and Fire Al
Warning Tiles & Tape above Sand Cover for Electrical Lines of Emergency (MH/PG/EM/1-2 & 13-14-15)
Sand Bedding for Irrigation Lines (Dia 63 & 110 mm) at Entrance, inside Butterfly Garden, as highligh
Surface preparation prior to Install Boulders for Planted beds (7 no's) at center of Discovery Garden,
Installation of PVC Conduit (Dia. 25mm) & Boxes for Power System (Disconnect Switch) at New Ticket
Installation of straight UPVC Conduit (Dia. 160mm) Medium Voltage Ductbank No. CC/D-MV/25 (fro
Installation of straight UPVC Conduit (Dia. 160mm) Medium Voltage Ductbank No. DD/D-MV/10 (from
Installation of straight UPVC Conduit (Dia. 160mm) Medium Voltage Ductbank No. CC/D-MV/16 (from
Installation of straight UPVC Conduit (Dia. 160mm) Medium Voltage Ductbank (from Manhole no. D/M
Installation of straight UPVC Conduit (Dia. 160mm) Medium Voltage Ductbank no. DD/D-MV/29 (D/MV
Installation of straight UPVC Conduit (Dia. 160mm) Medium Voltage Ductbank no. CD/D-MV/03 (from
Installation of straight UPVC Conduit (Dia. 160mm) Medium Voltage Ductbank no. CD/D-MV/01 (from
Installation of straight PVC Conduit (Dia. 25mm) and Boxes for Fire Alarm (Flash Beacon) at Ground F
Surface Preparation Prior to Start Backfilling at North Administration Building at Zone 2Q, Axis 02AX-02A
Inspection and Compaction test for 7th Layer of Backfilllng between duct tunnel Shaft of MCPE 1 and B
Inspection and Compaction test for 7th Layer of Backfilllng between duct tunnel Shaft of MCPE 1 and B
Level and Location for South Administration Building Columns and Walls , ( Columns ( C10, C11, C12 , C
Level and Location for Diaphragm wall ( 3rd part ) at Zone 1E , Axis 01P , Level Upto 873.50 (as highlight
Excavation for Footing of Diaphragm wall at Zone 1C , Axis 01G (As Highlighted)
Level and Location for Plain Concrete Under Footing ( only ) of Diaphragam Wall , Zone 1C , Axis 01G ,
Level and Location for Infill wall ( Inner ) at Zone 2F , Axis 02S - 02T , TOC 876.00 (As Highlighted)
Level and Location for MCPE 2 Roof Slab , Axis 02AA - 02AB , ZONE 2H , Level 875.974 & 875.850 (as hig
Level and Location for Footing ( F1 & F4 ) and Grade Beam at Energy Center , Axis 17-19/N , 17-22/O , 1
Level and Location for Infill wall ( Inner ) ( 2nd Stage ) at Zone 1D , Axis 01L-01M (As Highlighted)
"Level and Location for Infill wall ( Inner ) at Zone 1A , Axis 01A-01B , Level upto 873.355 ( As Highlighte
Level and Location for Infill wall ( Inner ) at Zone 1A , Axis 01C-01D , Level Upto 873.10 (As Highlighted)
Surface preparation prior to start backfilling for the Duct Bank of MV Line from D/MV/21 to D/MV/28 a
Level and Location for Infill wall ( Inner ) at Zone 1A , Axis 01B-01C, Level upto 873.10 (As Highlighted)
Level and Location for North Administration Building wall ( W12 ) , Zone 2Q , Axis 02AY , Level upto 873
Level and Location for Mass concrete ( 1st Layer ) ( Outer ) Under Strip footing at Zone 1J , Axis 01AC-
Surface preparation prior to start waterproofing and waterproofing for the Duct Bank of MV Line fr
Two Layer of 4mm thick Modified Bituminous WaterProofing Membrane Under Rc Foundations of Central
Protection Layer of 4mm thick Bituminous Protection Board Under Rc Foundations of Central Bridge Abut
Cementitious Water Proofing Under Rc Foundations of Central Bridge Abutment , Grid 02AL , Zone 4 (A
Inspection of Concrete (Plain) Pouring for the Duct Bank of MV Line from D/MV/21 to D/MV/28 at Zone-
Shuttering for Diaphragm wall ( 3rd part ) at Zone 1E , Axis 01P , Level Upto 873.50 (as highlighted)
Concreting for Diaphragm wall ( 3rd part ) at Zone 1E , Axis 01P , Level Upto 873.50 (as highlighted)
Steel Reinforcement for Neck Columns at Energy Center , Axis 4-6/A-B , 12-13/A (As Highlighted)
Inspection of Sand covering for protection of pipe for Heating and Chilled Water Line at Zone-H - As hi
Inspection of Excavation for LV Line at Zone-G including Pit G/LV/39, G/LV/41 - as highlighted
Shuttering for South Administration Building Columns and Walls , ( Columns ( C10, C11, C12 , C13 , C15
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 5) around MV Line Pit G/MV/29
Shuttering for Plain Concrete Under Footing ( only ) of Diaphragam Wall , Zone 1C , Axis 01G , Level Upt
Surface Preparation prior to start backfilling for MV Line Pit G/MV/29 at Zone- G (As Highlighted)
Shuttering for Infill wall ( Inner ) at Zone 2F , Axis 02S - 02T , TOC 876.00 (As Highlighted)
Inspection and Compaction test for backfilling Sub-grade 2nd Layer (2 of 4) for Non potable water line
Concreting for Infill wall ( Inner ) at Zone 2F , Axis 02S - 02T , TOC 876.00 (As Highlighted)
Inspection and Compaction test for backfilling Sub-grade 2nd Layer (2 of 2) above Sand Coveing for Non
Surface Preparation and Primer Coating Under Rc Foundations of Central Bridge Abutment , Grid 02AL ,
Inspection for Installation of Pit and Slab for MV Line Pit - G/MV/29 at Zone-G - As Highlighted
Inspection and Compaction test for backfilling Sub-base 2nd Layer (2 of 2) for Car Park-J (CPJ5 - ST. 0+
Shuttering for MCPE 2 Roof Slab , Axis 02AA - 02AB , ZONE 2H , Level 875.974 & 875.850 (as highlighted)
Excavation for Fire & Security Distribution Line from G/FS/37 to L/FS/04 at Zone-G,K,L including Branc
Concreting for MCPE 2 Roof Slab , Axis 02AA - 02AB , ZONE 2H , Level 875.974 & 875.850 (as highlighted
Excavation for Telecommunication Line from G/TL/23 to L/TL/02 at Zone-G,K,L Including Branch and Pit
Shuttering and Concreting for Footing ( F1 & F4 ) and Grade Beam at Energy Center , Axis 17-19/N , 17-2
Excavation for Fire & Security Distribution Line from C/FS/26 to C/FS/06 At Zone-C Including Pit C/FS/26,
Shuttering for Infill wall ( Inner ) ( 2nd Stage ) at Zone 1D , Axis 01L-01M (As Highlighted)
Excavation for Telecommunication Line from C/TL/68 to C/TL/25 at Zone-C Including Pit C/TL/68, C/TL/25
Concreting for Infill wall ( Inner ) ( 2nd Stage ) at Zone 1D , Axis 01L-01M (As Highlighted)
"Shuttering for Infill wall ( Inner ) at Zone 1A , Axis 01A-01B, Level upto 873.355 ( As Highlighted ) "
Inspection and Compaction Test for backfilling Sub-base 1st Layer (1 of 1) under Boulder No. WRB-10 -
"Concreting for Infill wall ( Inner ) at Zone 1A , Axis 01A-01B, Level upto 873.355 ( As Highlighted ) "
Inspection and Compaction test for backfilling Sub-grade 3rd Layer (3 of 4) for MV Line Pit C/MV/44, C
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 2) above Sand Coveing for Non
Shuttering for Infill wall ( Inner ) at Zone 1A , Axis 01C-01D , Level Upto 873.10 (As Highlighted)
Pre insulated Heat & Chilled water pipes, Heat 200Ømm & Chilled 400mmØ ( laying ,Aligment ,Level
Concreting for Infill wall ( Inner ) at Zone 1A , Axis 01C-01D , Level Upto 873.10 (As Highlighted)
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 2) for Telecommunication and
Shuttering for Infill wall ( Inner ) at Zone 1A , Axis 01B-01C, Level upto 873.10 (As Highlighted)
Concreting for Infill wall ( Inner ) at Zone 1A , Axis 01B-01C, Level upto 873.10 (As Highlighted)
Steel Reinforcement for MCPE 2 Roof Slab , Axis 02AA - 02AB , ZONE 2H , Level 875.974 & 875.850 (as h
Installation of Rock and Boulder No. WRB-39 - 4th layer (4 of 4)
Concreting for North Administration Building wall ( W12 ) ,Zone 2Q , Axis 02AY , Level upto 873.475 (as
Steel Reinforcement for Perimeter wall ( 1st Stage ) ( Outer ) Zone 1M, Axis 01AL-01AM , Level Upto 874
Antitermite Under Mass Concrete Under Strip footing ( Outer ) at Zone 1J ,Between Axis 01AC-01AD, (as
Shuttering for Mass concrete ( 1st Layer ) ( Outer ) Under foundation at Zone 1J , Axis 01AC-01AD, TOC
Concreting for Mass concrete ( 1st Layer ) ( Outer ) Under Strip footing at Zone 1J , Axis 01AC-01AD, TO
Shuttering for North Administration Building wall ( W12 ) ,Zone 2Q , Axis 02AY , Level upto 873.350 (as
Installation and Survey Report of Installed Anchor Bolts at Energy Center , Axis 17-19/N , 17-22/O , 17-
Steel Reinforcement for Infill wall (outer) ( Inclined Wall ) at Zone 1F , Axis 01R-01S (as highlighted)
Pipe Installation of Trees Sub-Surface Drainage (Main Line & Branches) Pipes; ( Perforated110 mmØ
'Bedding of Gravel 3/8" and Geotextile Surrounding Pipe Installation of Trees Sub-Surface Drainage
'Warning Tape For Non-Potable Water (Irrigation Main Line); (160 & 110 mmØ- UPVC-Class-5 ) ; As
'Warning Tape For Irrigation ROW Mainline (200mmØ- UPVC-Class-5 ); As per High lighted Attached
Installation of Potable Water Pipes (80mm Ø & 50mm Ø uPVC Class 5) at Zone B (Beside Aviary Garden
Installation of Main Fire Water Pipes (160mm Ø uPVC Class 5) at Zone B (Beside Aviary Garden) as pe
Installation of Condensate Drain Pipe Sleeve (75mm Ø uPVC Class 4) at South Administration Crescen
Installation of UPVC conduit (dia. 25mm) and Box for Voice and Data (WIFI & FO Converter) at the Infi
Installation of UPVC conduit (dia. 25mm) and Box for Fire Alarm (Speaker & Flashing Beacon) at the Inf
Installation of UPVC conduit (dia. 75mm) Low Current Duct Bank (Fire Alarm) in between Manhole no
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 2) above Red Tiles for MV Li
Inspection and Compaction test for backfilling Sub-grade 2nd Layer (2 of 3) above Duct Bank of MV
Inspection of Sand covering for protection of pipe for Heating and Chilled Water Line at Zone-G - As hi
Inspection of Sand bedding under pipe for Fire & Security Distribution Line at Zone-L - as highlighted (
Installation of UPVC Conduit (dia.75mm) Low Voltage Ductbank (Normal Lighting) in between Man
Inspection of Sand bedding under pipe for Telecommunication Line at Zone-L - as highlighted (Sand from
Inspection of Sand bedding under pipe for LV Line at Zone-L - as highlighted (Sand from Source - SAS Int
Installation of UPVC Conduit (dia.75mm) Low Voltage Ductbank (Emergency) in between Manhole (MH
Level and Location for Infill wall ( Outer ) Zone 1M, Axis 01AJ-01AK (As Highlighted )
Installation of UPVC Conduit (dia.75mm) Low Voltage Ductbank (Small Power Ckt. & Normal Lighting)
Inspection and Compaction test for 1st Layer Backfilling for Energy Center 2 , Zone 5A ,Axis 9-15/D-H (as
Inspection and compaction test for 1st and 2nd Layer Backfilling Under Duct Tunnel , MCPE2 at Zone 2K
Inspection and compaction test for 1st and 2nd Layer backfilling for Strip footing ( Outer ) , Zone1K , A
Inspection and Compaction test for 5th and 6th Layer of backfilling under Duct Tunnel , MCPE2 at Zone 2
Inspection and compaction test for 1st Layer backfilling for Four Foundation at Zone 2R Axis 02AZ-02BA
Inspection and Compaction test for 6th Layer of Backfilllng between duct tunnel Shaft of MCPE 1 and B
Surface Preparation Prior to Start Backfilling Under Duct Tunnel , MCPE2 at Zone 2K, Axis 02AG-02AH (a
Surface Preparation prior backfilling for Four Foundation at Zone 2R Axis 02AZ-02BA (as highlighted) S
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 5) around MV Line Pit G/MV/07
' Installation of Storm Water Pipes (PP & UPVC) 600mm Ø & 400mm Ø, from (MH-Q-06 to MH-Q-07),
Surface Preparation prior to start backfilling for MV Line Pit G/MV/07 at Zone- G (As Highlighted)
Inspection and Compaction Test for backfilling Sub-grade 3rd and 4th Layer (3&4 of 4) under Boulder N
'Bedding of Gravel 3/8" and Geotextile surrounding in Storm Water Pipes (PP & UPVC) 600mm Ø &
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 3) above Duct Bank of MV L
Inspection of Blinding Concrete under LV Line Pit - F/LV/24, F/LV/04, F/LV/21, F/LV/03, F/LV/20, F/L
Inspection of backfilling Gravel 1st Layer (1 of 2) for Canopy Foundation and Column Neck of Seating A
Concreting for Child care (SOG) Slab on Grade zone 2N , Axis 02AR-02AT (as highlighted)
Steel reinforcement for South Administration Building Columns ( C1 , C1a , C29 , C30 , C32 , C33 , C34 , C
Steel Reinforcement for Footing ( F1 & F4 ) and Grade Beam at Energy Center , Axis 17-19/N , 17-22/O ,
Steel reinforcement for Diaphragm wall ( Beam ) , at Zone 1E Axis 01M , Level Upto 869.00 (as highlight
Grouting of Installed Anchor bolt PG 430-50-70, PF 430-70-70 under POT BEARING at CENTRAL BRIDG
Concreting for Infill wall ( Outer ) Zone 1M, Axis 01AJ-01AK (As Highlighted )
Installation of Potable Water Pipes (50mm Ø uPVC Class 5) & Non-Potable Water Pipes (50mm Ø uPVC
Shuttering for Infill Perimeter wall ( Outer ) Zone 1M, Axis 01AJ-01AK (As Highlighted )
Concreting for MCPE 1 , Duct Tunnel Wall from 03V , Zone 2M 2N (As Highlighted ) Level 874.50
Surface Preparation Prior to Start WaterProofing for Footing , Beam and Blockwork ( Outer Side ) at Ene
Surface Preparation Prior to Start WaterProofing for Wall ( Inner Side ) at Energy Center , Axis 0-1/C-I ,
Two layer of 4mm thick modified bituminous waterproofing Membrane for MCPE 2 wall from axis 03E to
Surface Prparation And Primer Coating For North Administration Building for Infill Wall ( Inner Side )
Protection Layer of 4mm thick Bituminous Protection Board for North Administration Building Inner Infil
Single Layer of 4mm thick Modified Bituminous WaterProofing Membrane for North Administration Building
Single Layer of 4mm thick Modified Bituminous WaterProofing Membrane For North Administration Buildi
Concreting for Diaphragm wall Beam at Zone 1E , Axis 01M (As Highlighted)
Surface Preparation and primer for MCPE 2 wall from axis 03E to 03I zone 2G 2H (as highlighted) from
Shuttering for MCPE 2 Roof Slab at Zone 2K , Between Axis 02AF-02AG , TOC 875.974 & 875.850 (As Hi
Surface Preparation and Primer Coating for MCPE 2 under Rc Tunnel Foundation , Axis 02AB - 02AE , ZON
Two Layers of 4mm thick Modified Bituminous WaterProofing Membrane for MCPE 2 under Rc Tunnel Fou
Protection Layer of Geotextile and Screed for MCPE 2 under Rc Tunnel Foundation , Axis 02AB - 02AE ,
Concreting for MCPE 1 for Bottom Slab of Duct Tunnel , Axis 03/R , Zone 2M 2N , TOC 871.00 (As Highlig
Concreting for North Administration Building, Concrete Upstand on roof floor at Zone 2R ,Axis 02Z-02BB
Installation of straight uPVC conduit (Dia. 160mm) Low Voltage Ductbank in beween Manhole (B/LV/36
Excavation and Bed preparation for Irrigation Lines (Dia 63 & 110 mm) at Entrance, inside Butterfly G
Inspection for Installed Electrical Handholes of Low Voltage (MH/WG/LV/34, 35 & 36), at Geyser Gard
Inspection of 3rd Layer Gravel Backfilling (50cm ht) for Sub Surface Drainage Pipes (for Trees) At Top
Screed protection above Geo Textile on Top of Slab Surface of Wet Well E (at 872.60 Level), Inside Wa
Geo Textile above Membrane on Top of Slab Surface of Wet Well E (at 872.60 Level), Inside Water Gar
Installation of straight UPVC Conduit (Dia. 160mm) Low Voltage Ductbank no. FF/D-LV/27 (F/LV/12 to
Installation of straight UPVC Conduit (Dia. 160mm) Medium Voltage Ductbank no. CC/D-MV/06 (fro
Installation of straight UPVC Conduit (Dia. 160mm) Medium Voltage Ductbank no. LL/D-MV/10 (from
Installation of Ligthning Arrester Rod OPR System with Tripod and Ligthning Down Conductor (25mm x 3
Installation of Ligthning Arrester Rod OPR System with Tripod and Ligthning Down Conductor (25mm x 3
Installation of Ligthning Arrester Rod OPR System with Tripod and Ligthning Down Conductor (25mm x 3
Installation of Ligthning Arrester Rod OPR System with Tripod and Ligthning Down Conductor (25mm x 3
Installation of Ligthning Arrester Rod OPR System with Tripod and Ligthning Down Conductor (25mm x 3
Installation of Ligthning Arrester Rod OPR System with Tripod and Ligthning Down Conductor (25mm x
Installation of PVC conduit (dia. 25mm) and Box for Security (CAM) at the Infill Wall Crescent -1 Garde
Installation of PVC conduit (dia. 25mm) and Box for Voice and Data (CAM) at the Infill Wall Crescent -
Inspection for Installation of all Rings (Riser) and Slab for Manhole MH-G-08 (As Highlighted)
Inspection for Installation of Heating and Chilled water Line Pit G-DC-11 - as highlighted.
Inspection for Installation of Non-Potable Water Line Pit - NPW-ISC-26, NPW-ISC-27 & NPW-ISC-28 at Zo
Inspection of Concrete (Plain) Pouring for the Duct Bank of MV Line from C/MV/23 to C/MV/06 at Zone
Inspection and Compaction test for backfilling Sub-grade 4th Layer (4 of 4) around MV Line Pit C/M
Inspection of Excavation for LV Line Pit G/LV/43 at Zone-G- - as highlighted
Inspection and Compaction test for backfilling Sub-Base 2nd Layer (2 of 2) for Car Park-J (CPJ2 ST. 0+0
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 4) for Non potable water line
"Surface Preparation prior to start backfilling for Non potable water line Pit POC-27 & POC-28 at Zone-C
Inspection of Sand bedding under pipe for RO Water Line at Zone-G - As highlighted (Sand from Source -
Inspection and Compaction test for backfilling sub-grade 2nd Layer (2 of 3) for Storm Water Line from
Inspection and Compaction test for backfilling Sub-grade 2nd Layer (2 of 4) above Gravel around Sto
Inspection of Sand bedding under pipe for Fire & Security Distribution Line At Zone-C - as highlighted (
Installation of HDPE Water Features Pipes (315Ø mm SDR 11) at Water Garden Wet Well E & Water
Inspection of Sand bedding under pipe for Telecommunication Line at Zone-C - as highlighted (Sand fro
Inspection of Sand bedding under pipe for LV Line at Zone-C - as highlighted (Sand from Source - SAS Int
Inspection of Sand bedding under pipe for LV Line at Zone-G - as highlighted (Sand from Source - SAS In
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 2) above Red Tiles for MV
Inspection of Excavation for Tree Pit (16 No's) as Details D-38-1 inside wadi area - as highlighted
Inspection of Excavation for MV Line from M/MV/02 to E/MV/06 and E/MV/10 to E/MV/05 at Zone-E - as
Inspection and Compaction test for backfilling Sub-grade 2nd Layer (2 of 2) for MV Line including
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 2) for MV Line including
Installation of Rock and Boulder No. WRB-39 - 3rd layer (3 of 4)
"Inspection of Grouting (Horizontal & Vertical Joints) for Rock Boulder - RB-276 for All Layers"
"Inspection of Grouting (Horizontal & Vertical Joints) for Rock Boulder - RB-279 for All Layers"
"Inspection of Grouting (Horizontal & Vertical Joints) for Rock Boulder - RB-302 for All Layers"
Inspection and Compaction test for 1st and 2nd Layer backfilling For Infill Wall , Zone 2A , Axis 02C-02D
Inspection for Installation of Stone Cladding without Copping for Seating Area 3 - 26 at Zone-K (As Highl
Inspection and Compaction test for 3rd and 4th Layer Under Duct Tunnel , MCPE2 at Zone 2K, Grid 03/M
Surface Preparation prior to start backfilling for Infill Wall ( Inner ) , Zone1C & 1D, Axis 01I-01K (as highl
Surface Preparation prior to start backfilling for 2nd Span ( Outer ) , Zone1K , Axis 01AD-01AF (as highli
Level and Location for MCPE 1 for Bottom Slab of Duct Tunnel , Axis 03/R , Zone 2M 2N , TOC 871.00 (As
Level and Location for MCPE 2 Roof Slab at Zone 2K , Between Axis 02AF-02AG , TOC 875.974 & 875.85
Level and Location for MCPE 2 Roof Slab , Axis 02AB - 02AC , ZONE 2J , Level 875.974 & 875.850 (as high
Level and Location for ring beam , Zone 1A (outer) Axis 01B to 01D , Level 877.50 (as highlighted)
"Inspection and Compaction test for backfilling Sub-grade 3rd Layer (3 of 4) above Gravel around S
Concreting for MCPE 2 Roof Slab at Zone 2K , Between Axis 02AF-02AG , TOC 875.974 & 875.85 (As Hig
Inspection of Excavation for MV Line from C/MV/44 to C/MV/43 including Pit C/MV/16 at Zone-C - as hig
Concreting for MCPE 2 Roof Slab , Axis 02AB - 02AC , ZONE 2J , Level 875.974 & 875.850 (as highlighted)
Steel reinforcements for MCPE 2 Roof Slab at Zone 2K , Between Axis 02AF-02AG , TOC 875.974 & 875.
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 2 ) above Sand Coveing for Fire
Inspection and Compaction test for backfilling Sub-grade 1st layer (1 of 2) above Sand Coveing for Pota
Shuttering for MCPE 1 for Bottom Slab of Duct Tunnel , Axis 03/R , Zone 2M 2N , TOC 871.00 (As Highlig
Steel Reiforcement for MCPE 1 for Bottom Slab of Duct Tunnel , Axis 03/R , Zone 2M 2N (As Highlighted
Inspection of Concrete Encasement for all Storm Water Line branches and Surface preparation prior to s
Inspection of Concrete Encasement for all Storm Water Line branches and Surface preparation prior to s
Shuttering for MCPE 2 Roof Slab , Axis 02AB - 02AC , ZONE 2J , Level 875.974 & 875.850 (as highlighted)
Steel Reinforcement for MCPE 2 Roof Slab , Axis 02AB - 02AC , ZONE 2J , Level 875.974 & 875.850 (as hi
Inspection and Compaction test for backfilling Sub-base 1st Layer (1 of 2) for Car Park-J (CPJ6 - ST. 0+
Inspection and Compaction test for backfilling Sub-grade 2nd Layer (2 of 3) above Red Tiles for MV Li
Inspection and Compaction Test for backfilling Sub-grade 1st and 2nd Layer (1&2 of 4) under Boulder N
Surface Preparation prior to start backfilling for Southern Car Park Access Road from ST. 0+260 to 0+46
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 3) around Non Potable water li
Inspection and Compaction test for backfilling sub-grade 1st Layer (1 of 3) for Storm Water Line from
Concreting for ring beam zone 1A (outer) Axis 01B to 01D , Level 877.50 (as highlighted)
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 4) around Fire Water Line Pit fo
Inspection and Compaction test for backfilling Sub-grade 1st layer (1 of 2) above Sand Coveing for Pota
Shuttering for ring beam zone 1A (outer) Axis 01B to 01D , Level 877.50 (as highlighted)
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 2) above Sand Coveing for Non
Steel Reinforcement for Perimeter Wall ( 2nd stage ) ( Outer ) , at Zone 1L, Axis 01AH-01AI , Level Upto
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 2 ) above Sand Coveing for Fire
Concreting for Infill wall (inner) at zone 2A Between 02C-02D from 863.55 to 869.16 (As Highlighted)
Inspection of Excavation for LV Line between F/LV/05 and F/LV/20 at Zone-F including Pit - F/LV/24, F/L
Installation of PVC Conduit (Dia. 25mm) and Boxes for Fire Alarm (Break Glass) at Ground Floor South
Installation of straight PVC Conduit (Dia.25mm) for Voice and Data (CAM) at Roof Floor Site Tower No
Installation of straight PVC Conduit (Dia. 25mm) for Fire Alarm (Smoke Detector ,Speaker , Mounted
Installation of straight PVC Conduit (Dia.25mm) for Security (CAM) at Roof Floor Site Tower No. 5 as
Installation of straight UPVC Conduit (Dia. 160mm) Medium Voltage Ductbank (from Manhole no. C/M
Installation of straight UPVC Conduit (Dia. 160mm) Low Voltage Ductbank (G/LV/04 to G/LV/61), Duc
Inspection and compaction test of 5th and 6th Layer of subgrade backfilling Beside Foundation of Retain
Inspection and Compaction test for 3rd and 4th Layer of backfilling under Duct Tunnel , MCPE2 at Zone 2
Inspection and Compaction test for 1st and 2nd Layer Under Duct Tunnel , MCPE2 at Zone 2K, Grid 03/M
Inspection and Compaction test for 1st Layer Under Duct Tunnel , MCPE2 at Zone 2K, Grid 03/N (as hig
Level and Location for MCPE 2 Blinding of Foundation between axis 02AB to 02AE (TOC 870.7) ZONE 2J (
Level and Location for Infill wall ( Upper Part ) at Zone 1A , Axis 01A to 01B , Level 877.50 (As Highlight
Concreting for Large Mosque Lower Second Floor Upstand ( UB3 ) for, Zone 1G Axis (1-1.1/D-E ) Level up
Concreting for Large Mosque Lower Second Floor Wall ( W1 ) for, Zone 1G , Axis ( 1-2 / E-F ) Level from
Concreting for MCPE 2 Blinding of Foundation between axis 02AB to 02AE (TOC 870.7) ZONE 2J (as highl
Anti Termite Under Strip footing Mass Concrete at Zone 1J Between Axis 01AA- to 01AB, 01AB to 01AC (a
Concreting for Large mosque upper second flooor (Slab, beams) at zone 1G axis B-F, 1-6, 880.70-880.20
Steel Reinforcement for Infill wall ( Inner ) ( 2ns stage ) at Zone 1D , Axis 01L-01M (As Highlighted)
Anti Termite for MCPE 2 under Blinding of Foundation between axis 02AB to 02AE (TOC 870.7) ZONE 2J (
Shuttering for Child care (SOG) Slab on Grade zone 2N (as highlighted) axis 02AR-02AT
Steel Reinforcements for Rc Strip Footing ( Outer ) ,at Zone 1C , Axis 01I-01J (as highlighted)
Protection Layer of Geotextile and Screed for Under Strip Footing ( Inner ) at Zone 1M From Axis 01AK to
Single Layer of 4mm thick Modified Bituminous WaterProofing Membrane for Under Strip Footing ( Inne
Surface Preparation and Primer coating for Under Strip Footing ( Inner ) at Zone 1M From Axis 01AK to 0
Surface Preparation and Primer Coating for Rc Foundation ( Outer ), at Zone 1K , Axis 01AD - 01AE (as h
Protection layer of 4mm thick nituminous protection board for RC foundation (outer) at zone 1K, Axi
Single Layer of 4mm thick Modified Bituminous WaterProofing Membrane for Rc Foundation ( Outer ), at
Protection Layer of 4mm thick Bituminous Protection Board for Rc Strip Foundation ( Outer ), at Zone 1K
Shuttering for MCPE 2 Blinding of Foundation between axis 02AB to 02AE (TOC 870.7) ZONE 2J (as highl
Concreting for North Administration Building Columns ( C60 , C61 , C62 , C64 , C66 , C67 , C68 ) , Zone 2
Concreting for Rc Strip Foundation ( Inner ) at Zone 1L, Axis 01AH-01AI (As Highlighted)
Steel Reinforcement for Infill wall ( Upper Part ) at Zone 1A , Axis 01A to 01B , Level 877.50 (As Highlig
Concreting for Infill wall ( Upper Part ) at Zone 1A , Axis 01A to 01B , Level 877.50 (As Highlighted)
Inspection for Installed Electrical Handholes of Emergency (MH/PG/EM/17) and Low Voltage (MH/PG/L
Inspection of 2nd Layer Gravel Backfilling (50cm ht) for Sub Surface Drainage Pipes (for Trees) At Top
Inspection of 1st layer Gravel Backfilling (50cm ht) for Sub Surface Drainage Pipes (for Trees) At Top
Sand Cover & Protection for Low Current Lines (MH/PG/LC/1-2 & 16-18-19) and Fire Alarm & Security
Sand Cover & Protection for Electrical Lines of Emergency (MH/PG/EM/1-2 & 13-14-15) and Low Volta
Single Layer 4mm thk. Modified Bitumenous Water proofing Membrane on Top of Slab Surface of Wet We
Solvent Base Primer Coating prior to Membrane Water proofing on Top of Slab Surface of Wet Well E (
Filed joint jacketing for Pre-insulated Chilled Water Pipes (dia 200mmØ) From point (E:647779.363
Inspection Of Pipe Installation For Irrigation ROW Sub-Mainline (110 & 160 mmØ- UPVC-Class-5 ); A
Pipe Installation of Trees Sub-Surface Drainage (Main Line & Branches) Pipes; ( Perforated110 mmØ
'Bedding of Gravel 3/8" and Geotextile Surrounding Pipe Installation of Trees Sub-Surface Drainage
' Warning Tape Installation of Strom Water Pipes (PP 600mm Ø) from MH-Y-02 to MH-Y-03 at Outfall Y
' Gravel 3/8" Backfilling and Geotextile of Strom Water Pipes (PP 600mm Ø) from MH-Y-02 to MH-Y-03
Pipe Installation of cast iron drainage pipe,ground floor At Crescent 2 Zone-2R; (cast iron dia 110
Steel Reinforcement & Shuttering for Lintels of Doors & Stiffner Column's for all walls at Ground Floo
Installation of PVC Conduit (Dia. 25mm) and Boxes for Fire Alarm (Flash beacon) at Ground Floor Sout
Installation of PVC Conduit (Dia. 25mm) and Boxes for Voice & Data (DATA & Telephone) at Ground Fl
Excavation and Surface preparation for Foundations of Cage 2 & 3 of Internal Garden, Inside Aviary G
Concrete Pouring & Shuttering for Wall of Decant Sump-D3 at Mist Garden, inside Water Garden as h
Application of Primer Prior to Damp proofing for Footings & Walls of Seat Walls (3 no's) All sides, Ins
Installation of straight PVC Conduit (Dia. 25mm) & Boxes for Lighting System (LED W1, W1/E) at First
Concrete pouring & shuttering for kicker of Water feature Pump Room along Boundary wall, at Butterf
Installation of straight UPVC Conduit (Dia. 160mm) Low Voltage Ductbank no. BB/D-LV/03 (B/LV/49 t
Installation of straight UPVC Conduit (Dia. 160mm) Medium Voltage Ductbank No. DD/D-MV/05 (from
Installation of straight UPVC Conduit (Dia. 160mm) Medium Voltage Ductbank No. CC/D-MV/16 (from
Installation of PVC Conduit (Dia. 25mm) & Boxes for Power System (Disconnect Switch) at New Ticket
Coordinates & Levels for kicker of Water feature Pump Room along Boundary wall, at Butterfly Garden
Level and Location for Blinding Under Foundation and Grade Beam at Energy Center , Axis 3-6/H-K , Leve
Level and Location for Footing and Grade Beam at Energy Center , Axis 4-6 /A-C , at Level 871.70 (As Hi
Level and Location for Cafeteria Staicase (riser and Landing) Zone 2A Axis 02B from 863.45 to 865.118 (a
Level and Location for Rc Strip Foundation ( Inner ) at Zone 1L, Axis 01AH-01AI (As Highlighted)
Level and Location for Mass concrete ( 1st Layer ) ( Outer ) Under foundtion at Zone 1J , Axis 01AA-01A
Level and Location for Strip footing Zone 1K Axis 01AE-01AF ( As highlighted)
Level and Location for North Administration Building Columns ( C60 , C61 , C62 , C64 , C66 , C67 , C68 )
Block Work laying for ETFE Pump Room no # 6098 upto lintel beam at Zone 2H, Axis 02AA , Level upto 87
Steel Reinforcement for Stiffner Column and Lintel Beam for ETFE Pump room no # 6098 at Zone 2H , Axi
Surface Preparation prior to start backfilling For Infill Wall , Zone 2A , Axis 02C-02D , 02/1 (as highlighte
Steel reinforcements for Infill Perimeter wall ( Outer ) Zone 1M, Axis 01AJ-01AK (As Highlighted )
Anitermite Under Blinding Under Foundation and Grade Beam at Energy Center , Axis 3-6/H-K , Level 87
Shuttering and Concreting for Blinding Under Foundation and Grade Beam at Energy Center , Axis 3-6/H-
Steel Reinforcement for Footing and Grade Beam at Energy Center , Axis 4-6 /A-C , at Level 871.70 (As
Shuttering and Concreting for Footing and Grade Beam at Energy Center , Axis 4-6 /A-C , at Level 871.70
Concreting for RC foundation and Strip footing of Diaphragm wall Zone 2M axis 02AL, (Grid 9 to 13) , Le
Shuttering for RC foundation and Strip footing of Diaphragm wall Zone 2M axis 02AL, (Grid 9 to 13) , Le
Steel Reinforcements for Perimeter Wall ( 1st Stage ) ( Outer ) at zone 1M , Axis 01AK-01AL , Level up
Shuttering for Rc Strip Footing ( Outer ) ,at Zone 1C , Axis 01I-01J (as highlighted) Shuttering for Rc Str
Shuttering for Cafeteria Staicase (riser and Landing) Zone 2A Axis 02B from 863.45 to 865.118 (as highli
Shuttering for Rc Strip Foundation ( Inner ) at Zone 1L, Axis 01AH-01AI (As Highlighted)
Steel Reinforcement for Rc Strip Foundation at Zone 1L, Axis 01AH-01AI (As Highlighted)
Surface Preparation and Primer coating For North Administration Building for Column and Top of Foundati
Shuttering for Mass concrete ( 1st Layer ) ( Outer ) Under foundtion at Zone 1J , Axis 01AA-01AC, TOC 8
Concreting for Strip footing Zone 1K Axis 01AE-01AF ( As highlighted)
Shuttering for Strip footing Zone 1K Axis 01AE-01AF ( As highlighted)
Shuttering for North Administration Building Columns ( C60 , C61 , C62 , C64 , C66 , C67 , C68 ) , Zone 2
Steel reinforcement for South Administration Building Columns ( C4, C5, C8, C9, C12, C13, C19 ) at Zone
'Warning Tape For Non-Potable Water (Irrigation Main Line); (200 mmØ- UPVC-Class-5 ) ; As per Hig
' Installation of Storm Water Pipes (PP & UPVC) 800mm Ø, 450mm Ø, from MH-Q-01 to MH-Q-06, MH-Q
'Bedding of Gravel 3/8" and Geotextile surrounding in Storm Water Pipes (PP & UPVC) 800mm Ø, 45
Installation of straight PVC Conduit (Dia.25mm) for Voice and Data (CAM) at Site Tower No 5 as per
Inspection and Compaction test for backfilling Sub-grade 3rd Layer (3 of 4) for MV Line Pit D/MV/28,
Soil Preparation under Boulder No. WRB-60
Soil Preparation under Boulder No. WRB-19
Excavation for Fire & Security Distribution Line At Zone-C Including Pit C/FS/25, C/FS/49 - as highlighted
Excavation for Telecommunication Line at Zone-C Including Pit C/TL/24, C/TL/23 - as highlighted
Inspection of Excavation for LV Line at Zone-C including Pit - C/LV/23, C/LV/24, C/LV/13, C/LV/29 & C2-1
Soil Preparation under Boulder No. WRB-18
Inspection of Sand Covering to protect the pipe for RO Water Line at Zone-C - as highlighted (Sand from
Inspection of Sand Coveing Layer for protection of Non-Potable Water Line at Zone-D - as highlighted (
Inspection of Excavation for LV Line at Zone-G including Pit - G/LV/35, G/LV/34, G/LV/33, G/LV/15 - as h
Inspection of backfilling Gravel 1st Layer (1 of 1) for Manhole MH-G-12 at Zone-C - As Highlighted (Stock
Inspection of Sand Coveing Layer for protection of Fire Water Line at Zone-2 - as highlighted (Sand from
Inspection of Sand Coveing Layer for protection of Potable Water Line at Zone-2 - as highlighted (Sand
Inspection of Sand Coveing Layer for protection of Non-Potable Water Line at Zone-C&D including branc
Pre insulated Heat & Chilled pipes, (150Ø, 200Ø,400mmØ) ( laying ,Aligment ,Leveling and fit up)
Filed joint jacketing for Pre-insulated Heat Water Pipes (dia 150mmØ) From point (E:647793.493 N
Inspection and Compaction test for backfilling Sub-grade 3rd Layer (3 of 4) around MV Line Pit C/M
Installation of Rock and Boulder No. WRB-39 - 2nd layer (2 of 4)
Surface Preparation prior to start backfilling for Parking Area @ Zone-G - as highlighted
Inspection for Laying of Red Tiles and Warning Tape above the pipe for MV Line from B/MV/22 to B/MV/
Concreting for MCPE 2 Ground Floor Slab at Zone 2H , Between Axis 02AA_03I-1 , Level 871.00 (as highl
Anti termite for Diaphragm wall under blinding of foundation at Zone 1B , Axis 01F (As Highlighted)
Shuttering for Infill Perimeter wall (Outer ) ( 2nd Stage ) ( Inclined ) at Zone 1L , Axis 01AG-01AH , Leve
Concreting for Infill Perimeter wall (Outer ) ( 2nd Stage ) ( Inclined ) at Zone 1L , Axis 01AG-01AH , Lev
Steel reinforcement for South Administration Building Columns and Walls , Columns ( C2, C3, C6, C7, C1
Shuttering for North Administration Building Columns ( C51, C52 , C53 , C54 , C55 ) at Zone 2Q, Axis 0
Concreting for diaphragm wall Stiffners ( 2nd part ) ( from the Center ) upto Bottom of Slab at Zone 1E ,
Shuttering for diaphragm wall Stiffners ( 2nd part ) ( from the Center ) upto Bottom of Slab at Zone 1E ,
Steel reinforcements for Diaphragm wall ( Vertical wall ) ( Inner Side ) and Columns at Zone 1E Axis 01M
Steel reinforcements for Diaphragm wall ( 3rd part ) at Zone 1E Axis 01P , Level Upto 873.50 (as highligh
Shuttering for Mass concrete ( 2nd Layer ) ( Inner ) Under Strip footing at Zone 1J , Axis 01AA-01AD (A
Concreting for Mass concrete ( 2nd Layer ) ( Inner ) Under Strip footing at Zone 1J , Axis 01AA-01AD (As
Shuttering for Diaphragm Wall ( Wall ) at Zone 2C , Grid 02J , Level from 871.98 to 873.15 ( As Highlighte
Concreting for Diaphragm Wall ( Wall ) at Zone 2C , Grid 02J Level from 871.98 to 873.15 (As Highlighted
Shuttering for Infill wall (Stiffiner) at axis 01G (BII-8) , 01F (BII-7) (A highlighted) Zone 1B
Concreting for Infill Wall (Stiffiner) wall at axis 01G (BII-8) , 01F (BII-7) (A highlighted) Zone 1B
Steel Reinforcements for Cafeteria Staircase at Zone 2A, Axis 02A-02B (as highlighted)
Concreting for North Administration Building Columns ( C51, C52 , C53 , C54 , C55 ) at Zone 2Q, Axis 02
Steel reinforcements for Child care (SOG) Slab on Grade zone 2N (as highlighted) axis 02AR-02AT
Concreting for RC foundation and Strip footing of Diaphragm wall Zone 2M axis 02AL, (grid 5 to 9 ) , Lev
Shuttering for RC foundation and Strip footing of Diaphragm wall Zone 2M axis 02AL, (grid 5 to 9 ) , Lev
Inspection and compaction test of 3rd and 4th Layer of subgrade backfilling Beside Foundation of Retain
Inspection and Compaction test of 3rd Layer of Backfilling in Energy Center, Axis 3-9/D-H (As Highlighted
Inspection of Formwork and Concrete pouring for Beam of Seating Area 3-33 at Zone-K - As Highlighted
Inspection and Compaction test for 1st and 2nd Layer of backfilling under Duct Tunnel , MCPE2 at Zone 2
Surface Preparation prior to start backfilling Under Duct Tunnel , MCPE2 at Zone 2K, Grid 03/M , 03/N
Level and Location for Infill Perimeter wall (Outer ) ( 2nd Stage ) ( Inclined ) at Zone 1L , Axis 01AG-01
Level and Location for North Administration Building Columns ( C51, C52 , C53 , C54 , C55 ) at Zone 2Q,
Level and Location for Diaphragm wall stiffeners (2nd part) from center, upto bottom of slab at zone 1
"Surface Preparation prior to start backfilling for Non potable water line Pit POC-23 at Zone-C - As High
Inspection and Compaction test for backfilling Sub-grade 2nd Layer (2 of 4) around MV Line Pit C/M
"Inspection and Compaction test for backfilling Sub-grade 2nd Layer (2 of 4) above Gravel around S
Inspection and Compaction test for backfilling Sub-grade 2nd Layer (2 of 2) above Duct Bank for MV L
Inspection and Compaction test for backfilling Sub-grade 2nd Layer (2 of 4) for MV Line Pit D/MV/28,
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 2) forStorm Water Line and Bra
Surface Preparation prior to start backfilling for Parking Area CPG @ Zone-B - as highlighted
Inspection of Excavation for MV Line from C/MV/30 to C/MV/01 at Zone-C - as highlighted (SCR:KAIG
Inspection and Compaction test for backfilling Sub-grade 8th Layer (8 of 8) for Non potable water line
Inspection and Compaction test for backfilling Sub-grade 8th Layer (8 of 8) for MV Line Pit L/MV/11 & L
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 3) above Red Tiles for MV Lin
Inspection and Compaction test for backfilling Sub-base 1st Layer (1 of 2) for Car Park-J (CPJ5 - ST. 0+
Inspection of Sand bedding under pipe Fire & Security Distribution Line At Zone-C - as highlighted (SAS
Level and Location for Diaphragm Wall ( Wall ) at Zone 2C , Grid 02J , Level from 871.98 to 873.15 (As Hi
Inspection of Sand bedding under pipe for Telecommunication Line at Zone-C - as highlighted (Sand fro
Level and Location for Infill Wall (Stiffiner) wall at axis 01G (BII-8) , 01F (BII-7) (A highlighted) Zone 1B
Inspection of Sand bedding under pipe for RO Water Line at Zone-C&H - As highlighted (Sand from Sourc
Inspection of Sand bedding under pipe for Non-Potable Water Line at Zone-C&H - as highlighted (Sand f
Level and Location for Child care (SOG) Slab on Grade zone 2N (as highlighted) axis 02AR-02AT 871.08,
Inspection of Sand bedding under pipe for Fire Water Line at Zone-C&H - as highlighted (Sand from Sour
Inspection of Sand bedding under pipe for Potable Water Line at Zone-C&H - as highlighted (Sand from s
Inspection for Laying of Red Tiles and Warning Tape above the pipe for MV Line from D/MV/01 to D
Inspection for Laying of Red Tiles and Warning Tape above the pipe for MV Line from C/MV/17 to D/MV
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 4) above Gravel around Sto
Level and Location for Diaphragm wall ( Inclined wall ) at Zone 1E , Axis 01P , Level upto 868.75 (As Hig
Inspection of Formwork & Concrete pouring for Footing of MV Line Pit - C/MV/28, E/MV/08, E/MV/09
Shuttering for Large Mosque Lower Second Floor Upstand ( UB3 ) for, Zone 1G Axis (1-1.1/D-E ) Level up
Inspection of Steel Reinforcement for Footing and Wall of MV Line Pit - C/MV/28, E/MV/08, E/MV/09
Concreting for perimeter wall upper part for TIP zone 2R Axis 02BC to tip, (as highlighted) TOC 877.4
Shuttering for Infill wall (upper part) outer Zone 1A between axis 01A-01B (as highlighted) TOC 877.500
Concreting for Foundation of Retaining wall at Axis 01U-01W , Zone 2&3 , (As Highlighted)
Inspection of Steel Reinforcement for Beam of Seating Area 3-33 at Zone-K - As Highlighted
Surface Preparation prior to start Blinding Concrete under Beam of Seating Area 3-27 at Zone-K - As Hig
Excavation for Storm Water Line from G-N-08 to G-N-10 at Zone-05 Including branch, Manhole MH-N-10
Excavation for Fire & Security Distribution Line At Zone-C Including Pit C/FS/24, C/FS/22, C/FS/43, C/FS/0
Excavation for Telecommunication Line at Zone-C Including Pit C/TL/34, C/TL/40, C/TL/35, C/TL/09, C/TL
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 2) above Duct Bank for MV L
Inspection of Concrete (Plain) Pouring for the Duct Bank of MV Line from D/MV/13 to D/MV/06 at Zone-
Inspection and Compaction test for backfilling sub-grade 5th Layer (5 of 6) for Storm Water Line from
Inspection and Compaction test for backfilling Sub-grade 7th Layer (7 of 8) for Non potable water line
Inspection and Compaction test for backfilling Sub-grade 7th Layer (7 of 8) for MV Line Pit L/MV/11 & L
Inspection of Excavation for RO Water Line at Zone-C&H - As highlighted
Inspection of Excavation for Non-Potable Water Line at Zone-C&H - as highlighted
Excavation for Storm Water Line from MH-M-02 to MH-M-02-01 at Zone-07 - As highlighted
Inspection of Blinding Concrete under MV LinePit C/MV/28, C/MV/29, C/MV/39, E/MV/08, E/MV/09 -
Inspection of Excavation for MV LinePit C/MV/28, C/MV/29, C/MV/39, E/MV/08, E/MV/09 - as highlig
Inspection of Excavation for MV Line from C/MV/11 to D/MV/18 and C/MV/24 to D/MV/28 at Zone C&D
Excavation for Fire & Security Distribution Line at Zone-L Including Pit L/FS/10, L/FS/16, L/FS/29, L/FS/2
Excavation for Telecommunication Line at Zone-L Including Pit L/TL/31, L/TL/29, L/TL/08, L/TL/09, L/TL/1
Inspection of Excavation for LV Line at Zone-L including Pit - L/LV/31, L/LV/08, L/LV/06, L/LV/02, L/LV/09
Excavation for Fire Water Line at Zone-C&H including Pit C/F/12,C/F/14, H/F/01 - as highlighted
Inspection of Excavation for Potable Water Line at Zone-C&H - as highlighted
Installation of Rock and Boulder No. WRB-39 - 1st layer (1 of 4)
"Inspection of Grouting (Horizontal & Vertical Joints) for Rock Boulder - RB-107 for All Layers"
"Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 4) above Gravel around S
"Inspection of Grouting (Horizontal & Vertical Joints) for Rock Boulder - RB-093 for All Layers"
Inspection of Sand Covering Layer for Protection of MV Line from C/MV/17 to D/MV/13 at Zone-C&D - as
"Inspection of Grouting (Horizontal & Vertical Joints) for Rock Boulder - RB-106 for All Layers"
Inspection and Compaction test for backfilling sub-grade 4th Layer (4 of 5) for Storm Water Line from
Inspection of Blinding Concrete under Non-Potable Water Line Isolation Pit for NPW-ISC-26, NPW-ISC-2
Inspection of backfilling Gravel 1st and 2nd Layer (1&2 of 2) around Storm Water Line Manholes MH-
Inspection of backfilling Gravel 2nd Layer (2 of 2) around Storm Water Line Manholes MH-G-11, MH-G-
Inspection and Compaction test for backfilling Sub-grade 6th Layer (6 of 8) for Non potable water line
Inspection and Compaction test for backfilling Sub-grade 6th Layer (6 of 8) for MV Line Pit L/MV/11 & L
Inspection for Installation of MV Line Pit - C/MV/08, C/MV/26, C/MV/09, C/MV/37, C/MV/07, C/M
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 4) around MV Line Pit C/M
Inspection and Compaction test for backfilling Sub-base 1st Layer (1 of 1) under Boulder No. WRB-47 (S
Soil Preparation under Boulder No. WRB-10
Inspection of Formwork and Concrete pouring for Beam of Seating Area 3-34 at Zone-K - As Highlighted
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 1) around Storm Water Line
Inspection of Formwork and Concrete pouring for Footing of MV Line Pulling Pit - D/MV/12 at Zone-D (A
Inspection of Steel Reinforcement for Footing and Wall of MV Line Pulling Pit - D/MV/12 at Zone-D (As H
Inspection of Blinding Concrete under MV LinePit D/MV/26, D/MV/15, D/MV/29 - as highlighted
Inspection of Excavation for MV LinePit D/MV/26, D/MV/15, D/MV/29 - as highlighted
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 1) for Car Park-J (CPJ6 - ST. 0
Inspection and Compaction test for backfilling Sub-grade 3rd Layer (3 of 3) around MV line pit G/MV/
Inspection and Compaction test for backfilling Sub-Base 2nd Layer (2 of 2) for Car Park-J (CPJ4 - ST. 0+
Inspection and Compaction test for backfilling Sub-grade 2nd Layer (2 of 2) under Boulder No. WRB-47 (
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 4) for MV Line Pit D/MV/28,
Inspection and Compaction test for backfilling sub-grade 3rd Layer (3 of 5) for Storm Water Line from
Inspection and Compaction test for backfilling Sub-grade 5th Layer (5 of 8) for Non potable water line
Inspection and Compaction test for backfilling Sub-grade 5th Layer (5 of 8) for MV Line Pit L/MV/11 & L
Inspection and Compaction test for backfilling Sub-grade 2nd Layer (2 of 8) for MV Line Pit L/MV/11 &
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 8) for MV Line Pit L/MV/11 &
Inspection of Steel Reinforcement for Beam of Seating Area 3-34 at Zone-K - As Highlighted
"Surface Preparation prior to start backfilling for MV Line Pit C/MV/06, C/MV/41, C/MV/01, C/MV/11,
Surface Preparation prior to start backfilling around Storm Water Line Manholes MH-O-07-3, MH-O-07-
Excavation for Storm Water Line from MH-M-02-01 to MH-M-02-02 including Manhole MH-M-02-01 and
Inspection of Excavation for MV Line from C/MV/23 to C/MV/06 at Zone-C - as highlighted (SCR:KAIG
"Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 2) above Red Tiles for LV Line
Sand Cover & Protection for Water Feature Line (Pipes dia 160) Connecting to Wet Well (E), Inside Wa
Steel reinforcement for Wall of Decant Sump-D2 at Geyser Garden, inside Water Garden as highligh
Inspection & Compaction tests of Sub-Base Layer Backfilling above Low Current Lines (MH/WG/LC/12 t
Inspection & Compaction tests of Sub-Base Layer Backfilling above Electrical Lines of Emergency (
Inspection of backfilling Gravel 1st Layer (1 of 2) around Storm Water Line Manholes MH-G-11, MH-G-1
Steel Reinforcement for Fountain 2 (Outer) (1 nos) Right Side, Inside Physic Garden as highlighted are
Inspection of Sand bedding under pipe for LV Line at Zone-G - as highlighted (Sand from Source - SAS I
Inspection of Excavation for Site Wide Irrigation Sytem Line at Zone-G - as highlighted
Concrete Pouring for Blinding under Fountain 2 (1 nos) (Outer) Left Side, Inside Physic Garden as high
Inspection for Laying of Red Tiles and Warning Tape above the pipe for LV Line from B/LV/47 to B/LV/36
Coordinates & Levels for Wall of Decant Sump-D3 at Mist Garden, inside Water Garden as highlighte
Coordinates & Levels of Blinding under Fountain 2 (1 nos) (Outer) Left Side, Inside Physic Garden as h
Coordinates and Level for Blinding Under Stone Edgers inside Outer Canopy 1 & 3, at physic garden a
Gravel (Drainage) & Geo Textile (Filter membrane Terrain 1000) for Landscaping Plantation areas and T
Concrete Pouring & Shuttering for Slab & Walls of Cabin Room, ETFE Pump Room and Remaining Boundar
Sand Bedding for Low Current Lines of Fire Alarm & Security (MH/PG/FA/15-16), Inside Physic Garden
Sand Bedding for Electrical Lines of Emergency (MH/PG/EM/16-17) and Low Voltage (MH/PG/LV/15-16),
Excavation for Low Current Lines of Fire Alarm & Security (MH/PG/FA/15-16), Inside Physic Garden as
Excavation for Electrical Lines of Emergency (MH/PG/EM/16-17) and Low Voltage (MH/PG/LV/15-16), I
Inspection and compaction test of 3rd (final) layer backfilling (Sub-Grade) (out of 3 layers) under foun
Inspection and compaction test for backfilling of single layer sub-base between 1st & 2nd line of boul
Inspection of 2nd Layer Gravel Backfilling (50cm ht) Surround the Decant Sump-D4 Inside Water Play g
Concrete Pouring for Blinding Under Electrical Handholes of Emergency (MH/PG/EM/17) and Low Volt
Excavation and Blinding Levels for Electrical Handholes of Emergency (MH/PG/EM/17) and Low Voltag
Pipe Installation of Sub-Surface Drainage (Main Line & Branches) Pipes; ( Perforated110 mmØ UPVC C
Installation of Low Voltage Ductbank UPVC Conduit (75mm) in between Manhole (TG/N/LV-03 & Trench,
Installation of Low Voltage Ductbank UPVC Conduit 75mm (Emergency) from Manhole no.TG/E/LV-01 to T
Pre insulated Heat& Chilled Fittings, ( laying ,Aligment ,Leveling and fit up) Chilled 200mmØ Fr
Pre insulated Heat & Chilled Pipes, ( laying ,Aligment ,Leveling and fit up) Heat Pipes 200mmØ, A
Concreting for Diaphragm wall blinding under foundation and strip footing at zone 2M axis 02AL (as high
Shuttering for Diaphragm wall blinding under foundation and strip footing at zone 2M axis 02AL (as high
Level and Location for South small mosque , Parapet, Axis F-G, 1-3 TOC from 876.65 to 877.80 Zone 2B
Level and Location for RC foundation and Strip footing of Diaphragm wall Zone 2M axis 02AL, (grid 5 to 1
Level and Location for North Administration Building Wall zone 2Q up 873.475 W1, W2 (as highlighted)
level and Location for Diaphragm wall (inclined)(left side) zone 1E Axis 01M (as highlighted)
Level and Location for Kicker of Infill wall ( Inner ) at Zone 2F , Axis 02S-02T , Level upto 868.95 (As Hig
Concreting for MCPE 2 wall and counter fort at Zone 2H Between axis 02AA to 02AB Level 871.00 (as h
Shuttering for Infill wall TIP ( Upper Part ) at Zone 1A , Axis 01A to TIP , Level 874.26 (As Highlighted)
Concreting for Infill wall TIP ( Upper Part ) at Zone 1A , Axis 01A to TIP , Level 874.26 (As Highlighted)
Concreting for RC Strip Footing at Zone 1K , Axis 01AD-01AE-01AF (As Highlighted)
Shuttering for South small mosque , Parapet, Axis F-G, 1-3 TOC from 876.65 to 877.80 Zone 2B (as high
Concreting for South small mosque , Parapet, Axis F-G, 1-3 TOC from 876.65 to 877.80 Zone 2B (as hig
Steel Reinforcements for diaphragm wall Stiffners ( 2nd part ) ( from the Center ) upto Bottom of Slab at
Steel reinforcements for upper second floor walls (W1, W3) from 880.00 to 882.60 at Large Mosque Zone
Steel reinforcements for RC foundation and Strip footing of Diaphragm wall Zone 2M axis 02AL, (grid 5 t
Concreting for North Administration Building Wall zone 2Q up 873.475 W1, W2 (as highlighted)
Shuttering for Kicker of Infill wall ( Inner ) at Zone 2F , Axis 02S-02T , Level upto 868.95 (As Highlighted)
Concreting for Kicker of Infill wall ( Inner ) at Zone 2F , Axis 02S-02T , Level upto 868.95 (As Highlighted
Surface Preparation and Primer Coating under Rc Foundation of diaphragm wall at zone 2M axis 02AL (a
Single layer of 4mm thick modified bituminous watrproofing under Rc Foundation of diaphragm wall at
Geotextile and Screed under Rc Foundation of diaphragm wall at zone 2M axis 02AL (as highlighted)
Steel reinforcements, Starter bars, Shear Connector, for ring beam zone 1A (outer) Axis 01B to 01D (as h
Shuttering for North Administration Building Wall zone 2Q up 873.475 W1, W2 (as highlighted)
Concreting for Rc Strip Footing ( Outer ) ,at Zone 1C , Axis 01I-01J (as highlighted)
Steel Reinforcement for Infill wall ( Inner ) at Zone 2F , Axis 02S - 02T , TOC 876.00 (As Highlighted)
Shuttering for South Small Mosque for Dome and Beam ( B6 & B7 ) , Zone 2B , Axis 4-6/B-D (As Highlight
Concreting for Diaphragm Wall (BEAM) at Zone 1M , Grid 01AM (As Highlighted) TOC 877.50
Steel reinforcements for Diaphragm wall (inclined)(left side) zone 1E Axis 01M (as highlighted)
Shuttering for Diaphragm wall (inclined)(left side) zone 1E Axis 01M (as highlighted)
Concretingfor Diaphragm wall (inclined)(left side) zone 1E Axis 01M (as highlighted)
Surface Preparation and primer for MCPE 1 under foundation at duct tunnel axis 03R Zone 2M 2N (as hi
Two layers of 4mm thick modified bituminous waterproofing for MCPE 1 under foundation at duct tunne
Geotextile and Screed for MCPE 1 under foundation at duct tunnel axis 03R Zone 2M 2N (as highlighted)
Installation of UPVC Conduit (dia.32mm) and Box for Ligthing at the Crescent-1 Large Mosque (First Flo
Installation of stub-up and Direct Buried strainght Upvc Conduit (dia.32mm) for Ligthing at the Physic
Installation of direct buried UPVC conduit (dia.75mm) Low Voltage Ductbank (Normal Power) in
Installation of straight uPVC conduit (Dia. 160mm) Low Voltage Ductbank in beween Manhole (L/LV/07
Installation of Low Voltage Ductbank UPVC Conduit 75mm (Small Power Ckt. & Normal Lighting) in
Installation of Low Voltage Ductbank UPVC Conduit 75mm (Emergency) in between Manhole (MH/PG
Installation of PVC conduit (Dia. 25mm) and for Lighting (U3 Floor luminaire) at Site tower -05 as per
Installation of PVC Conduit (Dia.25mm) & Boxes for Voice and Data (WIFI) at the Large Mosque First
Installation of straight PVC Conduit (Dia. 25mm) for Fire Alarm (Smoke Detector ,Speaker , Mounted
Installation of straight PVC Conduit (Dia.25mm) and Boxes for Security (CAM) at Site Tower No. 5 as
Pipe Installation of Trees Sub-Surface Drainage (Main Line & Branches) Pipes; ( Perforated110 mmØ
'Bedding of Gravel 3/8" and Geotextile Surrounding Pipe Installation of Trees Sub-Surface Drainage
Inspection Of Pipe Installation For Irrigation ROW Mainline (200mmØ- UPVC-Class-5 ); As per High l
Pipe Installation of Sub-Surface Drainage (Main Line & Branches) Perforated Pipes; (110 mmØ, UPVC
Pipe Installation of cast iron drainage pipe,ground floor At Crescent 2 zone 2N; (cast iron dia 110
HDPE Pipe Installation of Water Features pipes At water gardens (dia 250 mm SDR 11); As per High
Pre insulated Heat Water Pipes, ( laying ,Aligment ,Leveling and fit up) Heat Pipes 150mmØ.from p
Installation of Main Potable Water Pipes (110 mmØ-UPVC-Class-5) at zone (C&D) - From Point ( 6479
Installation of straight UPVC Conduit (Dia. 160mm) Medium Voltage Ductbank No. GG/D-MV/18 (fro
Installation of straight UPVC Conduit (Dia. 160mm) Medium Voltage Ductbank No. DD/D-MV/03 (from
Installation of straight UPVC Conduit (Dia. 160mm) Medium Voltage Ductbank No. DD/D-MV/02 (from
Installation of straight UPVC Conduit (Dia. 160mm) Medium Voltage Ductbank No. DD/D-MV/16 (from
Installation of straight UPVC Conduit (Dia. 160mm) Medium Voltage Ductbank No. DD/D-MV/25 (from
Installation of straight UPVC Conduit (Dia. 160mm) Medium Voltage Ductbank No. DD/D-MV/18 (from
Installation of straight UPVC Conduit (Dia. 160mm) Medium Voltage Ductbank No. CC/D-MV/19 (fro
Steel Reinforcement for wall & slab of Water feature Pump Room along Boundary wall, at Butterfly Ga
Excavation for Landscaping Plantation areas and Tree Pits (17 no's) at Planted beds (7 no's) at center
Installed ETFE Cushions (without aluminum caps) between axis 02-Z/02-AA.
Installed ETFE Cushions (without aluminum caps) between axis 02-Y/02-Z.
Installation of UPVC conduit (dia. 32mm) and Box for Lighting (F1/CE) at the Infill Wall Crescent -1 (PC)
Inspection for Installed Low Current Handholes of ICT (TG/T/LC-01) and Fire Alarm & Security (TG/F&S/
Inspection for Installed Electrical Handholes of Emergency (TG/E/LV-01) and Low Voltage (TG/N/LV-01,
Concrete Pouring for Blinding Under Electrical Handholes of Low Voltage (MH/WG/LV/34, 35 & 36), at
Excavation and Blinding Levels for Electrical Handholes of Low Voltage (MH/WG/LV/34, 35 & 36), at G
Inspection & Compaction tests of Sub-Base Layer Backfilling prior to Install Boulders for Planted beds
Sand Bedding for Water Feature Over flow Line (Pipes dia 300mm) from Decant Sump D4 to Wet Well (E
Excavation for Water Feature Over flow Line (Pipes dia 300mm) from Decant Sump D4 to Wet Well (E),
Inspection of 6th layer Gravel Backfilling (50cm ht) surround the Foundation & Wall of Wet Well F, In
Inspection of 8th layer Gravel Backfilling (50cm ht) surround the Foundation & Wall of Wet Well E, In
Inspection & Compaction tests of Sub-Base Layer Backfilling prior to Blinding Under Stone Edger Insid
Inspection & Compaction tests of Sub-Base Layer Backfilling prior to Blinding Under Stone Edger Insid
Sand Cover & Protection for Water Feature Line of Equalizer Pipes (dia 300mm) Between Wet Well E &
Surface Preparation prior to start backfilling under Duct Tunnel , MCPE2 at Zone 2H, Grid 03/1 (as high
Inspection and compaction test of 1st and 2nd Layer of subgrade backfilling Beside Foundation of Retain
Inspection and Compaction test of 2nd Layer Subgrade backfilling for Canopy Foundation , Axis 01C-01J
Inspection and compaction test for 3rd Layer of Subgrade Backfilling for MCPE2 Duct Tunnel at Zone 2J,
Level and Location for Large mosque upper second flooor (slab, beams) (as highlighted) at zone 1G axis
Level and Location for Diaphragm Wall (BEAM) at Zone 1N , Grid 01AM (As Highlighted) TOC 877.50
Level and location for MCPE 1 , Duct Tunnel Wall from 03V , Zone 2M 2N (As Highlighted ) 874.50
Level and Location for MCPE 2 Roof Slab at zone 2K Axis 02AG-02AH TOC 875.974, 875.85 (as highlighte
"Level and Location for Infill wall (Outer ) at Zone 1D , Axis 01L-01M (As Highlighted) 876.00"
Level and Location for Diaphragm wall (wall) at zone 2C, Grid 02J (as higlighted) 871.98
Concreting for MCPE 1 , Duct Tunnel Wall from 03V , Zone 2M 2N (As Highlighted ) 874.50
Shuttering for MCPE 1 , Duct Tunnel Wall from 03V , Zone 2M 2N (As Highlighted ) 874.50
Shuttering for Large mosque upper second flooor (slab, beams) (as highlighted) at zone 1G axis B-E, 1-6
Two layer of 4mm thick modified bituminous waterproofing for MCPE 2 wall from axis 03E to 03I zone 2
Surface Preparation and primer for MCPE 2 wall from axis 03E to 03I zone 2G 2H (as highlighted) from
"Concreting for Infill wall (Outer ) at Zone 1D , Axis 01L-01M (As Highlighted) 876.00"
Concreting for Infill wall ( Outer ) at Zone 2B , Axis 01AH - 01AI , Level From 872.50 to 873.00(As Highli
"Shuttering for Infill wall (Outer ) at Zone 1D , Axis 01L-01M (As Highlighted) 876.00"
Shuttering for Diaphragm Wall (BEAM) at Zone 1N , Grid 01AM (As Highlighted) TOC 877.50
Concreting for Rc Foundations of Diaphragm wall , at Zone 2M , Axis 02/AL (As Highlighted)
Concreting for MCPE 2 Roof Slab at zone 2K Axis 02AG-02AH TOC 875.974, 875.85 (as highlighted)
Shuttering for MCPE 2 Roof Slab at zone 2K Axis 02AG-02AH TOC 875.974, 875.85 (as highlighted)
Steel reinforcements for MCPE 2 Roof Slab at zone 2K Axis 02AG-02AH TOC 875.974, 875.85 (as highligh
Concreting for RC Strip Footing ( Inner )at Zone 1K , Axis 01AD-01AE (As Highlighted)
Steel reinfircement for (Stiffiner) wall at axis 01G (BII-8) 01F (BII-7) (A highlighted) Zone 1B
Concreting for Diaphragm wall (vertical) (right side) at Zone 1E , Axis 01M , Level upto 868.5 (As Highlig
Steel reinforcements for Large mosque upper second flooor (slab, beams, inverted beams) (as highlighte
Concreting for North Administration Building Columns C( 39-40-41-42-43-44--45-46-47-48 ) Zone 2Q , Le
Steel Reinforcement for Infill Perimeter wall (Outer ) ( 2nd Stage ) ( Inclined ) at Zone 1L , Axis 01AG-
Shuttering for Diaphragm Wall ( Wall ) at Zone 2C , Grid 02J (As Highlighted) 871.98
Concreting for Diaphragm Wall ( Wall ) at Zone 2C , Grid 02J (As Highlighted) 871.98
Level and Location for Blinding under Diaphragm wall Strip footing at Zone 1B , Grid 01/F (As Highlighte
level and Location for Energy Center Columns , Axis 7-11/A , Level from 884.50 to 887.00 (As Highlighted
Level and Location for Cafeteria for SOG undercroft , Zone 2A Axis 02A-02B (As Highlighted ) TOC 863.4
Level and location for Diaphragm Wall ( Kicker ) at Zone 1E , Grid 01M (As Highlighted) TOC 866.348,
Inspection 1st and 2nd Layer of Gravel backfilling Beside Foundation of Retaining wall at zone 1B Axis
Inspection and Compaction test for 3rd layer Back filling Under External Foundation of MCPE 2 , Axis 03W
Steel reinforcement for Diaphragm Wall ( Kicker ) at Zone 1E , Grid 01M (As Highlighted) TOC 866.348
Shuttering for Diaphragm Wall ( Kicker ) at Zone 1E , Grid 01M (As Highlighted) TOC 866.348, 865.928,
Concreting for Diaphragm Wall ( Kicker ) at Zone 1E , Grid 01M (As Highlighted) TOC 866.348, 865.928,
Shuttering and Concreting for Energy Center Columns , Axis 7-11/A , Level from 884.50 to 887.00 (As Hig
Steel reinforcement for Diaphragm Wall (BEAM) at Zone 1N , Grid 01AM (As Highlighted) TOC 877.50
Shuttering for Cafeteria for SOG undercroft , Zone 2A Axis 02A-02B (As Highlighted ) TOC 863.450
Concreting for Cafeteria for SOG undercroft , Zone 2A Axis 02A-02B (As Highlighted ) TOC 863.450
Concreting for Diaphragm wall Slab ( 3rd Span ) at Zone 1E , Axis 01P , level 869.00 (As Highlighted)
Concreting for Diaphragm wall Slab ( 1st Span ) at Zone 1E , Axis 01P , level 869.00 (As Highlighted)
Shuttering for Rc Foundations of Diaphragm wall , at Zone 2M , Axis 02/AL (As Highlighted)
Surface Preparation and Primer Coating for Blinding Under Rc Strip Foundation ( Inner ), at Zone 1L , Ax
Single Layer of 4mm thick Modified Bituminous WaterProofing Membrane for Above Blinding Under Strip F
Protection Layer of Geotextile and Screed for Above Blinding Under Strip Foundation ( Inner ), at Zone 1
Surface Preparation and Primer Coating for Rc Foundation ( Outer ), at Zone 1K , Axis 01AD - 01AE , 01AE
Inspection and compaction test for 1st and 2nd Layer of Subgrade Backfilling for MCPE2 Duct Tunnel at
Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Grade) inside the Boundary walls, @ Grid ( 0-1
Inspection and Compaction test of 2nd Layer of Backfilling in Energy Center, Axis 3-9/C-H (As Highlighted
Inspection and Compaction test for backfilling sub-grade 1st Layer (1 of 5) for Storm Water Line from
Installation of Main Fire Water Pipes (200,160mmØ-UPVC-Class-5)From Point (647922.748 East & 27
Filed joint jacketing for Pre-insulated Chilled Water Pipes (dia 200mmØ) From point (E:647545.6 N:
Installation of UPVC conduit (dia. 75mm) Low Current Ductbank (TELECOM) in between Manholes (TGT/L
Installation of UPVC conduit (dia. 75mm) Low Current Ductbank (Fire & Security) in between Manho
Installation of UPVC conduit (dia. 25mm) and Box for Voice and Data (WIFI & FO Converter) at the Infi
'Storm Water Pipes Installation (PP 600mm Ø) from MH-Y-02 to MH-Y-03 at Outfall Y. As per high lig
'Bedding of Gravel 3/8" and Geotextile surrounding in Storm Water Pipes (PP 600mm Ø) from MH-Y-02
Installation of UPVC conduit (dia. 25mm) and Box for Fire Alarm (Speaker & Flashing Beacon) at the Inf
Installation of UPVC conduit (dia. 25mm) and Box for Fire Alarm (Speaker) at the Infill Wall Crescent -
Installation of straight uPVC conduit (Dia. 160mm) Medium Voltage Ductbank in beween Manho
Installation of straight UPVC Conduit (Dia. 160mm) Medium Voltage Ductbank No. CD/D-MV/02 (from
Level and Location for RC strip footing (outer) at zone 1C axis 01I-01J (as highlight)
Level and Location for Blinding Under Footing and Grade Beam at Energy Center , Axis 4-6/A-C , Level 8
Level and Location for Mass concrete ( 2nd Layer ) ( Inner ) Under Strip footing at Zone 1M, Axis 01AK-
Level and Location for Mass concrete ( 2nd Layer ) ( Inner ) Under Strip footing at Zone 1J , Axis 01AA
Shuttering and Concreting for Energy Center Beam , Axis 0-4/A-C , Level 881.50 (As Highlighted )
Level and Location for Energy Center Beam , Axis 0-4/A-C , Level 881.50 (As Highlighted )
Level and Location for North Administration Columns ( C (39_40_41_42_43_44_45_46_47_48) at Zone 2Q
Protection Layer of Geotextile and Screed for Rc Strip Foorting , Axis 01AE - 01AF at Zone 1K (as highlig
Single Layer of Modified Bituminous WaterProofing Membrane for Rc Strip Foorting , Axis 01AE - 01AF at
Surface Preparation and Primer Coating for Rc Strip Foorting , Axis 01AE - 01AF at Zone 1K (as highlighte
Installation of straight PVC Conduit (Dia. 25mm) and Boxes for Security (CAM) at Ground Floor Site
Steel Reiforcement for MCPE 1 , Duct Tunnel Wall from 03/1-02/2 , Zone 2M 2N (As Highlighted )
Concreting for Blinding under Bottom Slab of Duct Tunnel at MCPE1 , Zone 2M 2N ( As Highlighted )
Concreting for Diaphragm wall blinding under foundation at Zone 1B , Axis 01F (As Highlighted) Level
Shuttering for Rc Strip Footing ( Outer ) ,at Zone 1C , Axis 01I-01J (as highlighted)
Shuttering for North Administration Columns ( C (39_40_41_42_43_44_45_46_47_48) at Zone 2Q , Axis 0
Concreting for Mass concrete ( 2nd Layer ) ( Inner ) Under Strip footing at Zone 1M, Axis 01AK-01AL (As
Shuttering for Mass concrete ( 2nd Layer ) ( Inner ) Under Strip footing at Zone 1M, Axis 01AK-01AL (A
Anitermite Under Blinding Under Footing and Grade Beam at Energy Center , Axis 4-6/A-C , Level 871.10
Installation of straight PVC Conduit (Dia. 25mm) and Boxes for Voice and Data (CAM) at Site Tower N
Shuttering and Concreting for Blinding Under Footing and Grade Beam at Energy Center , Axis 4-6/A-C , L
Shuttering for Blinding Under Central Bridge Abutment Foundation at Zone 4 , Grid 02/AL , Level 868.40
Concreting for Blinding Under Central Bridge Abutment Foundation at Zone 4 , Grid 02/AL , Level 868.4
Installation of straight PVC Conduit (Dia. 25mm) and Boxes for Fire Alarm (Smoke Detector) at Groun
Installation of PVC Conduits (Dia. 25mm) & Boxes for Voice & Data (CAM) in the Promenade & Canopies
Coordinates and levels for wall of decant sump-D1 at boat garden inside water garden as highlight
Installation of PVC Conduit (Dia. 25mm) and Boxes for Voice & Data (CAM) at Ground Floor North Admi
Installation of PVC Conduit (Dia. 25mm) and Boxes for Security (Card Redaer, Break Glass for Emerge
Installation of PVC Conduit (Dia. 25mm) and Boxes for Fire Alarm (Speaker) at Ground Floor North Adm
Mandrel Test for UPVC Conduits (Dia. 110mm) for Low Current (TL) in Ductbank BB/D-TL/02 (from Man
Mandrel Test for UPVC Conduits (Dia. 110mm) for Low Current (FA) in Ductbank BB/D-FS/01 (from Man
Pre insulated Heat water pipes, ( laying ,Aligment ,Leveling and fit up) Heat pipes 200mmØ, From po
"Inspection of Grouting (Horizontal & Vertical Joints) for Rock Boulder - RB-110 for All Layers"
"Inspection of Grouting (Horizontal & Vertical Joints) for Rock Boulder - RB-111 for All Layers"
"Inspection of Grouting (Horizontal & Vertical Joints) for Rock Boulder - RB-084 for All Layers"
Surface Preparation prior to start backfilling for MV Line Pit D/MV/28, D/MV/27, D/MV/30, D/MV/21 at
Inspection of Blinding Concrete under MV Line Pit - C/MV/36, D/MV/12 at Zone-C&D - as highlighted
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 2) under Boulder No. WRB-47 (
Inspection and Compaction Test for backfilling Sub-grade 4th Layer (4 of 4) for MV Line Pit C/MV/10,
Inspection and Compaction test for backfilling Sub-grade 4th Layer (4 of 8) for Non potable water line
Inspection and Compaction test for backfilling Sub-grade 4th Layer (4 of 8) for MV Line Pit L/MV/11 & L
Inspection and Compaction test for backfilling Sub-Base 2nd Layer (2 of 2) for Car Park-J (CPJ3 - ST. 0+
Inspection and Compaction test for backfilling Sub-grade 7th Layer (7 of 8) for LV Line Pit K/LV/05, K/L
Inspection and Compaction Test for backfilling Sub-grade 5th Layer (5 of 5) for MV Line Pit C/MV/0
Inspection and Compaction test for backfilling sub-grade 4th Layer (4 of 4) for Storm Water Line from
Inspection and Compaction test for backfilling sub-grade 2nd Layer (2 of 5) for Storm Water Line from
Inspection of Blinding Concrete under Heating & Chilled Water Line Isolation Pit for G/DC/11 at Zone-G -
Inspection for Installation of Non-Potable Water Line Pit - POC-31 at Zone-G - as highlighted
Soil Preparation under Boulder No. WRB-47
Inspection of Excavation for MV Line form D/MV/28 to D/MV/27 at Zone-D - as highlighted
Inspection of Excavation for MV Line form D/MV/06 to D/MV/19 at Zone-D including pit D/MV/12 - as hi
Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 4) for MV Line Pit C/MV/10,
Inspection and Compaction test for backfilling sub-grade 3rd Layer (3 of 5) for Storm Water Line from
Inspection and Compaction test for backfilling sub-grade 3rd Layer (3 of 4) for Storm Water Line from
Inspection of Excavation for MV Line form C/MV/20 to C/MV/14 at Zone-C - as highlighted
Inspection of Excavation for LV Line at Zone-G including Pit - G/LV/03, G/LV/16, G/LV/44, G/LV/53, G/LV
Inspection of Excavation for LV Line between F/LV/05 and PCCU/4 at Zone-F&G including Pit - F/LV/26,
Inspection and Compaction test for backfilling Sub-grade 3rd Layer (3 of 8) for MV Line Pit L/MV/11 & L
Inspection and Compaction test for backfilling Sub-grade 6th Layer (6 of 8) for LV Line Pit K/LV/05, K/L
Inspection and Compaction test for backfilling Sub-grade 3rd Layer (3 of 4) above Red Tiles for LV Line
Excavation and Removal of Disposal Material between 5x5 netwrok and Rock Level - as highlighted in t
Inspection of Sand bedding under pipe for Heating & Chilled Water Line at Zone-B - as highlighted (Sand
Inspection of Sand bedding under pipe for Fire Water Line at Zone-B - as highlighted (Sand from Source
Inspection of Sand bedding under pipe for Potable Water Line at Zone-B - as highlighted (Sand from Sou
Inspection of Grouting (Vertical & Horizontal) for Headwall and Stone Boulder for Outfall-E (for All Layer
Inspection of Grouting (Vertical & Horizontal) for Headwall and Stone Boulder for Outfall-G (for all Layer
Inspection for Installation of Heating and Chilled Water Line Pit for H/DC/39, H/DC/40, L/DC/11, L/DC/
Inspection of Sand bedding under pipe for RO Water Line at Zone-G - As highlighted (Sand from Source -
Inspection and Compaction test for backfilling Sub-Base 1st Layer (1 of 2) for Car Park-J (CPJ2 ST. 0+00
Inspection and Compaction test for backfilling Sub-grade 5th Layer (5 of 8) for LV Line Pit K/LV/05, K/L
Inspection and Compaction test for backfilling Sub-grade 2nd Layer (2 of 4) above Red Tiles for LV Line
Inspection and Compaction test for backfilling Sub-grade 2nd Layer (2 of 2) above Sand Covering for No
Inspection and Compaction test for backfilling Sub-grade 2nd Layer (2 of 4) for MV Line Pit D/MV/18,
Inspection and Compaction test for backfilling Sub-grade 2nd Layer (2 of 4) for MV Line Pit C/MV/31
Inspection and Compaction Test for backfilling Sub-grade 4th Layer (4 of 5) for MV Line Pit C/MV/0
Inspection and Compaction test for backfilling sub-grade 2nd Layer (2 of 5) for Storm Water Line from
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 4) for MV Line Pit C/MV/10,
"Inspection of Sand Covering Layer for Protection of MV Line from D/MV/01 to D/MV/17, D/MV/33 to
Surface Preparation prior to start backfilling around Storm Water Line Manholes MH-G-12, MH-G-11,
Inspection and Compaction test for Backfilling Sub-grade 1st Layer (1 of 4) for Storm Water Line Gull
INSPECTION FOR INSTALLATION OF STORM WATER LINE GULLIES G-G-25, G-G-23, G-G-24, G-G-22, G-G-21,
"INSPECTION FOR INSTALLATION OF STORM WATER LINE GULLIES G-O-22, G-O-7, G-O-6, G-O-5, G-O-4, G-
"Inspection for Installation of all Rings (Riser) and Slab for Manhole MH-G-09, MH-G-10, MH-G-10-1 a
Surface preparation prior to start water proofing for the Duct Bank of LV Line from B/LV/54 to B/LV/40
Inspection and Compaction test for backfilling sub-grade 2nd Layer (2 of 4) for Storm Water Line from
Inspection and Compaction test for backfilling Sub-grade 2nd Layer (2 of 2) above Red Tiles for MV
Inspection of Sand bedding under pipe for RO Water Line from POC-00 to ROW-ISC-02 and ROW-ISC-03 at
Inspection of Sand bedding under pipe for Fire & Security Distribution Line between C/FS/11 to C/FS/32
Inspection of Sand bedding under pipe for Telecommunication Line between C/TL/58 and C/TL/33 at Zone
Inspection for Installation of Fire Water Line Pit - C/F/08, C/F/09, C/F/07 at Zone-C - as highlighted
Installation of Potable Water Line Pit C/PW/03 at Zone-C - as highlighted
Inspection for Installation of Non-Potable Water Line Pit - POC-23 at Zone-C - as highlighted
Inspection of Excavation for Heating & Chilled Water Line at Zone-B including pit B/DC/03 - as highlighte
Excavation for Fire Water Line at Zone-B including Pit B/F/01, B/F/03 - as highlighted
Excavation for Potable Water Line at Zone-B including Pit B/PW/01, B/PW/02, B/PW/09 - as highlighted
Inspection of Sand bedding under pipe for MV Line from F/MV/01 to G/MV/20 at Zone-F&G - as highligh
Steel reinforcement for Diaphragm Wall ( Wall ) at Zone 2C , Grid 02J (As Highlighted)
Concreting for Infill Perimeter wall ( Inner ) at Zone 1L at Axis 01AI-01AJ ,TOC 876.00 ( As Highlighted)
Concreting for South Small Mosque for Dome and Beam ( B6 & B7 ) , Zone 2B , Axis 4-6/B-D (As Highlight
Concreting for North Administation Building Coluimns ( C20_C29_C30_C31_C32_C33_C34_C35 ) ,Zone 2Q
Level and Location for Diaphragm wall (vertical) (right side) at Zone 1E , Axis 01M , Level upto 868.5 (A
Level and Location for RC Strip Footing ( Inner )at Zone 1K , Axis 01AD-01AE (As Highlighted)
Concrete pouring for wall of Decant Sump-D1 at boat Garden, inside Water Garden as highlighted a
Inspection & Compaction tests of Sub-Base Layer Backfilling prior to Install Boulders for Planted beds
Sand Bedding for Electrical Lines of Low Voltage (MH/WG/LV/34 to 35 to 36), at Geyser Garden, Inside
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 3 layers) under Fountain 2
Concrete Pouring & Shuttering for Wall of Mechanical Manhole, at Grid (F-H/10-11), at Management
Solvent Base Primer Coating Prior to Damp proofing for Footings & Walls of Seat Walls (3 no's) All sid
Surface Preparation prior to Water Proofing for Footings & Walls of Seat Walls (3 no's) All sides, Insi
Gravel (Drainage) & Geo Textile (Filter membrane Terrain 1000) for Plantation area's with Tree Pits al
Excavation & Surface preparation for Plantation area's with Tree Pits along Outer Seat wall (remaining
Surface preparation prior to Install Boulders for Planted beds (3 no's) at center of Discovery Garden,
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 3 layers) under Fountain 2 (
Inspection of 2nd Layer Gravel Backfilling (50cm ht) Surround the Decant Sump-D4 Inside Water Play g
Inspection of 1st Layer Gravel Backfilling (50cm ht) Surround the Decant Sump-D4 Inside Water Play g
Surface Preparation Prior to Backfilling Surround the Decant Sump-D4 Inside Water Play garden (at B.
Inspection of Block work from Lintel upto Final Height for Walls of Toilets & Meeting Room, at Grid (1
Excavation for Landscaping area at Right side of Mist & Geyser Gardens, inside Water Garden, at hi
INSPECTION FOR MANHOLE BASE INSTALLATION AND UPVC PIPE CONNECTION FOR - MH-G-8, MH-G-09, M
INSPECTION FOR MANHOLE BASE INSTALLATION AND UPVC PIPE CONNECTION FOR - MH-O-07, MH-O-07-1
Inspection for Installation of LV Line Pit - B/LV/15, B/LV/16, B/LV/34, B/LV/35, B/LV/36, B/LV/54, B/LV
Inspection for Installation of Pit and Slab for MV Line Pit - C/MV/35 at Zone-C - As Highlighted (SCR:
Inspection of Excavation for LV Line between Feeding Pillar and F/LV/09 at Zone-A&F including Pit - A/LV
Inspection of Excavation for LV Line between F/LV/05 and F/LV/20 at Zone-F including Pit - F/LV/24, F/L
Inspection of Excavation for Sub-station - R7 and R11 at Zone-D&L - as highlighted
Inspection of Blinding Concrete under MV Line Pit - C/MV/06, C/MV/41, C/MV/01, C/MV/11 at Zone-C -
Inspection of Excavation for MV Line form C/MV/20 to C/MV/14 at Zone-C - as highlighted
Pipe Installation of Sub-Surface Drainage (Main Line & Branches) Perforated Pipes; (110 mmØ, UPVC
Coordinates and levels for foundation and kicker of Decant Sump-D2 at Geyser Garden, inside Wate
'Catch Basin Pipe Installation (315mm Ø- UPVC Pipes-Class 4 ) for Storm Water pipe Out Fall-G. As pe
Inspection of 2nd Layer Gravel Backfilling (50cm ht) for Sub Surface Drainage Pipes (dia 160 & 110mm
'Bedding of Gravel 3/8" and Geotextile surrounding in Catch Basin pipes (315mm Ø- UPVC Pipes-Class
Inspection of 1st Layer Gravel Backfilling (50cm ht) for Sub Surface Drainage Pipes (dia 160 & 110mm
Concrete pouring for foundation and kicker of Decant Sump-D2 at Geyser Garden, inside Water Gard
Steel reinforcement for foundation and kicker of Decant Sump-D2 at Geyser Garden, inside Water Ga
Protection Layer of 4 mm Thk. Bituminous Protection Board for Wall & Foundation (Outer surface) of
Inspection & Compaction tests of Single Layer (Sub-Base) Backfilling above Low Current Lines (MH/PG
Inspection & Compaction tests of Single Layer (Sub-Base) Backfilling above Electrical Lines of Eme
Pipe Installation of Water Features pipes Equalizer Between Wet Well E&F; (dia 315 mm UPVC Pipe C
Excavation for Fountain 2 (1 nos), (Outer) Left side, Inside Physic Garden as highlighted area in attac
Concrete Pouring & Shuttering for Dome of New Ticketing Booth # 5A, As per Attached Highlighted D
Pre insulated Heat water Fittings, ( laying ,Aligment ,Leveling and fit up) Heat Fittings 200mmØ, Fr
Installation of UPVC conduit (dia. 75mm) Low Current Ductbank (TELECOM) in between Manholes (M
Installation of UPVC conduit (dia. 75mm) Low Current Ductbank (Fire & Security) in between Man
Inspection of levels for Dome of New Ticketing Booth # 5A, As per Attached Highlighted Drawing's.
Concreting for Child Care Blinding Under SOG at Zone 2N (As Highlighted) Axis 02AR-02AT
Steel Reinforcement for RC Strip Footing ( Inner ) at Zone 1K , Axis 01AD-01AE (As Highlighted)
Concreting for Infill wall ( Inclined )(outer) at Zone 1F , Axis 01Q-01R , Level upto 876.00 (as highlighted
Shuttering for Diaphragm wall (vertical) (right side) at Zone 1E , Axis 01M , Level upto 868.5 (As Highli
"Steel Reinforcement for Infill wall (Outer ) at Zone 1D , Axis 01L-01M (As Highlighted)"
Concreting for Infill wall (Inner) at Zone 1D at Axis 01K-01L (1st Stage) , Level upto 873.215 ( As Highlig
Excavation for Mechanical Pipe of Soak Away ( Part 3 ) at Cenozoic Garden including ( FW-A-13-5 ) & ( C
Surface Preparation prior to start backfilling for MCPE2 Duct Tunnel at Zone 2J, Axis 02AB-02AE (as high
Level and Location for Infill wall ( Inclined )(outer) at Zone 1F , Axis 01Q-01R , Level upto 876.00 (as hig
Level and Location for Energy Center for foundation , Axis 12-13/A Level upto 871.70 (As Highlighted)
Level and Location for MCPE 2 wall and counter fort at Zone 2H Between axis 02AA to 02AB, Level upto
Level and Location for Energy Center Beam at Axis 0-14/I-L (As Highlighted) TOC 881.50
Level and Location for Infill Perimeter wall ( Inner ) at Zone 1L at Axis 01AI-01AJ ,TOC 876.00 ( As Highli
Level and Location for Blinding under undercroft Slab at Cafeteria , Zone 2A , Level upto 863.200 ( As Hi
Shuttering for RC Strip Footing ( Inner )at Zone 1K , Axis 01AD-01AE (As Highlighted)
Concreting for Blinding under undercroft Slab at Cafeteria , Zone 2A , Level upto 863.200 ( As Highlighte
Shuttering for Infill wall ( Inclined )(outer) at Zone 1F , Axis 01Q-01R , Level upto 876.00 (as highlighted)
Steel Reinforcement for Energy Center for Footing and Grade Beam , Axis 12-13/A , (As Highlighted)
Steel Reinforcement for Energy Center for Beam , Axis 0-4/A-C , at Level 881.50 (As Highlighted)
"Steel Reinforcement for Infill wall ( Inner ) at Zone 1A , Axis 01A-01B , 01B-01C , 01C-01D (As Highligh
1st and 2nd Layer of 4mm thick Modified Bituminous WaterProofing Membrane For Retaining wall for F
Shuttering and Concreting for Energy Center for foundation , Axis 12-13/A Level upto 871.70 (As Highl
Steel Reinforcement for Energy Center Columns , Axis 7-11/A , Level from 884.50 to 887.00 (As Highligh
Shuttering for MCPE 2 wall and counter fort at Zone 2H Between axis 02AA to 02AB, Level upto 875.55 (
Concreting for MCPE 2 wall and counter fort at Zone 2H Between axis 02AA to 02AB, Level upto 875.55 (
Shuttering and Concreting for Energy Center Beam at Axis 0-14, I-L (As Highlighted) TOC 881.50
Concreting for Diaphragm wall Slab ( 3rd Span ) at Zone 1E , Axis 01P , TOC 869.00 (As Highlighted)
Steel Reinforcement for Infill Perimeter wall (Outer ) at Zone 1L , Axis 01I-01J , Level upto 874.05 (As H
Shuttering for Infill Perimeter wall ( Inner ) at Zone 1L at Axis 01AI-01AJ ,TOC 876.00 ( As Highlighted)
Shuttering for Blinding under undercroft Slab at Cafeteria , Zone 2A , Level upto 863.200 ( As Highlighte
Antitermite under Blinding under undercroft Slab at Cafeteria , Zone 2A ( As Highlighted )
Antitermite under Blinding under SOG at Child Care, Zone 2N ( As Highlighted )
Stack Boulders Installed Layers at level +879.90, 880.30 & 880.70, along Open Channel (Aviary Garden
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 8) for Non potable water line P
"Inspection of Grouting (Horizontal & Vertical Joints) for Rock Boulder - RB-280 for All Layers"
"Inspection of Grouting (Horizontal & Vertical Joints) for Rock Boulder - RB-259 for All Layers"
Inspection Of Pipe Installation For Non-Potable Water (Irrigation Main Line); (160 & 110 mmØ- UPVC-
Inspection Of Pipe Installation For Irrigation ROW Mainline (200mmØ- UPVC-Class-5 ); As per High l
Mechanical Pipe sleeves Installation ,For (PW&NON PW) At Crescent 2 Zone (2Q) (North Administrati
Pre insulated Heat & chilled water Fittings, ( laying ,Aligment ,Leveling and fit up) Heat Fitting
Pre insulated Heat water Pipes,( laying ,Aligment ,Leveling and fit up) Heat Pipes 150mmØ.from poi
Filed joint jacketing for Pre-insulated Heat Water Pipes (dia 200mmØ) From point (E:647947.5562
Mechanical Pipe sleeves Installation ,For roof floor (RW&WVP) At Crescent 1 Zone (1G) (Large Mosq
"Inspection of Grouting (Horizontal & Vertical Joints) for Rock Boulder - RB-258 for All Layers"
"Inspection of Grouting (Horizontal & Vertical Joints) for Rock Boulder - RB-257 for All Layers"
Inspection for Installation of Heating and Chilled Water Line Pit for L/DC/18, H/DC/37, G/DH/06, G/DH/
Surface Preparation prior to start backfilling around Fire Water Line Pit for C/F/06, C/F/07, C/F/08, C/F/0
Surface Preparation prior to start backfilling around Potable Water Line Pit for C/PW/03, PW-05 - as high
Inspection and Compaction test for backfilling sub-grade 1st Layer (1 of 4) for Storm Water Line from
"Surface Preparation Prior to Start Backfilling for Storm Water Line Gullies G-O-1, G-O-2, G-O-3, G-O
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 4) above Red Tiles for LV Line
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 2) above Red Tiles for MV
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 2) above Sand Covering for No
Surface Preparation prior to start backfilling for Canopy Foundation and Column Neck of Seating Area 1
Inspection for application of Base Primer and Bituminous Damp Proofing (1st & 2nd Coat) for Canopy
Surface Preparation prior to start waterproofing for Canopy Foundation and Column Neck of Seating Ar
Inspection for application of Base Primer and Bituminous Damp Proofing (1st & 2nd Coat) for Beam of S
"Surface Preparation prior to start waterproofing for Beam of Seating Area 3-25, 3-26 at Zone-K - As Hig
Steel Reinforcement for Slab of Cabin Room & ETFE Pump Room, at Butterfly Garden, as highlighted a
Stack Boulders Installed Layers at level +877.90, 878.30, 878.70, 879.10 & 879.50, along Open Channe
Stack Boulders Installed Layers at level +875.90, 876.30, 876.70, 877.10 & 877.50, along Open Channe
Concrete Pouring & Shuttering for Foundation & Wall Starter of Wet Well Beside Water Feature, a
Coordinates & Levels for Wall of Mechanical Manhole, at Grid (F-H/10-11), at Management and Maint
Coordinates & Levels for Foundation & Wall Starter of Wet Well Beside Water Feature, at Managem
Warning tape and tiles for Low Current Lines (MH/PG/LC/06-08, 11-13 & 19-21) and Fire Alarm & Secu
Warning tape and tiles for Electrical Lines of Emergency (MH/PG/EM/15-16) and Low Voltage (MH/PG/
Inspection of 5th layer Gravel Backfilling (50cm ht) surround the Foundation & Wall of Wet Well F, In
Inspection of 7th layer Gravel Backfilling (50cm ht) surround the Foundation & Wall of Wet Well E, In
Excavation and bed preparation for sub surface drainage pipes (for trees) between Geyser and Mist ga
Warning Tiles & Tape above Sand Cover for Low Current Lines (MH/WG/LC/12 to 15), Fire Alarm & Sec
Warning Tiles & Tape above Sand Cover for Electrical Lines of Emergency (MH/WG/EM/18 to 21) & Lo
Installation of PVC Conduit (Dia. 25mm) for Lighting (EXIT Sign) at the Promenade & Canopies Crescen
Installation of PVC Conduit (Dia. 25mm) for Lighting (LED F1/CE) at the Promenade & Canopies Crescen
Installation of UPVC Conduits (Dia. 110mm) for Fire Alarm (FA & Security Cables) in the Promenade &
Installation of PVC Conduit (Dia. 25mm) and Boxes for Security (CAM) at Ground Floor Cretaceous Gar
Installation of PVC Conduit (Dia. 25mm) and Boxes for Voice & Data (CAM) at Ground Floor Cretaceous
Installation of PVC Conduits (Dia. 25mm) & Boxes for Fire Alarm (Speaker) in the Promenade & Canopi
Installation of PVC Conduit (Dia. 25mm) and Boxes for Voice & Data (DATA & Telephone) at Ground Fl
Inspection and Compaction test of 1st Layer of Backfilling in Energy Center, Axis 3-9/C-H (As Highlighte
HDPE Pipe Installation of Water Features pipes Equalizer Between Wet Well E&F; (dia 315 mm UPVC P
Pre insulated Heat Fittings,( laying ,Aligment ,Leveling and fit up) Heat Fittings 200mmØ.(E:647958
Pre insulated Heat & Chilled Pipes, ( laying ,Aligment ,Leveling and fit up) Heat Pipes 200mmØ.
Installation of PVC Conduit (Dia. 25mm) and Boxes for Voice & Data (DATA & Telephone) at Ground Fl
Installation of PVC Conduit (Dia. 25mm) and Boxes for Security (Card Redaer, Break Glass for Emergen
Installation of PVC Conduit (Dia. 25mm) and Boxes for Fire Alarm (Flashing Beacon, Interface Unit) a
Installation of PVC Conduit (Dia. 25mm) & Boxes for Power System (Disconnect Switch) at New Ticket
Level and Location for Rc Foundations of Diaphragm wall , at Zone 2M , Axis 02/AL (As Highlighted)
Level and Location for MCPE 2 Roof Slab at Zone 2K , Between Axis 02AF-02AG , TOC 875.974 & 975.85
Level and Location for Diaphragm wall Slab ( 3rd Span ) at Zone 1E , Axis 01P , TOC 869.00 (As Highlight
Excavation for Central Bridge Abutment Foundation at Zone 4 , Grip 02/AL (As highlighted)
Inspection and Compaction test for 8th layer of backfilling for MCPE 1 duct tunnel wall and Buttress (
Steel Reinforcement for Rc Foundations of Diaphragm wall , at Zone 2M , Axis 02/AL (As Highlighted)
Concreting for Infill wall at Zone 2B, Axis 02G , Level upto 872.3 (As Highlighted)
Concreting for MCPE 2 Roof Slab at Zone 2K , Between Axis 02AF-02AG , TOC 875.974 & 975.85 (As Hig
Steel Reinforcement for Diaphragm wall Slab ( 3rd Span ) at Zone 1E , Axis 01P , TOC 869.00 (As Highlig
Shuttering for Diaphragm wall Slab ( 3rd Span ) at Zone 1E , Axis 01P , TOC 869.00 (As Highlighted)
Shuttering for MCPE 2 Roof Slab at Zone 2K , Between Axis 02AF-02AG , TOC 875.974 & 975.85 (As High
Protection Layer of 4mm thick Bituminous Protection board for Infill wall ( outer Part ) , at Zone 2A , A
Steel reinforcements for MCPE 2 Roof Slab at Zone 2K , Between Axis 02AF-02AG , TOC 875.974 & 975.
Surface Preparation and Primer Coating for retaining wall ( wall ) at Zone 6 & 7 , for Axis 02G-02J , Le
Two Layers of 4mm thick Modified bituninous WaterProofing Membrane for retaining wall ( wall ) at Zon
Protection Layer of 4mm thick Bituminous Protection Board for retaining wall ( wall ) at Zone 6 & 7 , f
Steel Reinforcements for Rc Strip Footing ( Outer ) ,at Zone 1C , Axis 01I-01J (as highlighted)
Protection Layer of 4mm thick Bituminous Protection Board for Block Retainng wall Strip Foorting, at
Level and Location for Large Mosque Lower Second Floor Upstand ( UB3 ) for, Zone 1G Axis (1-1.1/D-E )
Surface Preparation prior to start backfilling for Retaining wall at zone 1B Axis 02G-02E (as highlighted)
Inspection and Compaction test of 1st of 2nd Layer Subgrade backfilling for Canopy Foundation , Axis 01
Inspection and Compaction test of 12th Layer of SubGrade backfilling for Retaining wall at Zone 2C Axis
Inspection and compaction test for 6th Layer of Subgrade backfilling for Strip footing ( Outer ) , Zone 1
Excavation for Diaphragm wall under blinding of foundation at Zone 1B , Axis 01F (As Highlighted)
Level and Location for Child Care Blinding inder SOG at Zone 2N (As Highlighted) Axis 02AR-02AT
Level and Location for Wall of Retaining wall, Axis 01W-01X , 01Y-01Z ,at Zone 2&3 , T.O.W. 868.90 (As
Level and Location for Blinding under Bottom Slab of Duct Tunnel at MCPE1 , Zone 2M 2N , Level upto 87
Level and Loction for Mass Concrete ( 1st Layer ) ( Inner ) under Foundation , Between PC 74 - PC 76
Level and Location for Plain Concrete ( Inner ) under Rc Strip Footing , Between PC 68 - PC 70 , Axis 0
Level and Location for Infill wall ( 1st Stage ) ( Vertical ) ( Outer ) at Zone 1L , Axis 01AH - 01AI , Level
Installation of straight UPVC Conduit (Dia. 160mm) Medium Voltage Ductbank (from Manhole no. D/M
Installation of straight UPVC Conduit (Dia. 160mm) Medium Voltage Ductbank no. DD/D-MV/29 (D/MV/
Installation of straight UPVC Conduit (Dia. 160mm) Medium Voltage Ductbank no. DD/D-MV/15 (fr
Installation of straight UPVC Conduit (Dia. 160mm) Medium Voltage Ductbank no. DD/D-MV/12 (from
Level and Location for South Small Mosque for Dome and Beam ( B6 & B7 ) , Zone 2B , Axis 4-6/B-D , L
Installation of straight UPVC Conduit (Dia. 160mm) Medium Voltage Ductbank (from Manhole no. D/M
Shuttering for Child Care Blinding inder SOG at Zone 2N (As Highlighted) Axis 02AR-02AT
Antitermite under Blinding under Bottom Slab of Duct Tunnel at MCPE1 , Zone 2M 2N ( As Highlighted )
Shuttering for Blinding under Bottom Slab of Duct Tunnel at MCPE1 , Zone 2M 2N ( As Highlighted )
Steel Reinforcement for perimeter wall (inner) at zone 1M, Axis 01AJ-01AK, level upto 876.00 (as high
Antitermite under Mass Concrete ( 1st Layer ) ( Inner ) under Foundation , Between PC 74 - PC 76 , at
Shuttering for Mass Concrete ( 1st Layer ) ( Inner ) under Foundation , Between PC 74 - PC 76 , at Zon
Concreting for Mass Concrete ( 1st Layer ) ( Inner ) under Foundation , Between PC 74 - PC 76 , at Zon
Antitermite under Plain Concrete ( Inner ) under Foundation , Between PC 68 - PC 70 , Axis 01AH - 01AI
Shuttering for Mass Concrete ( Inner ) under Foundation , Between PC 68 - PC 70 , Axis 01AH - 01AI , at
Concreting for Plain Concrete ( Inner ) under Rc Strip Footing , Between PC 68 - PC 70 , Axis 01AH - 01A
Steel Reinfrcment for Infill wall ( Inner ) at Zone 2F , Axis 02S - 02T , TOC 876.00 (As Highlighted)
Concreting for Wall of Retaining wall, Axis 01W-01X , 01Y-01Z ,at Zone 2&3 , T.O.W. 868.90 (As Highligh
Shuttering for Wall of Retaining wall, Axis 01W-01X , 01Y-01Z ,at Zone 2&3 , T.O.W. 868.90 (As Highlight
Shuttering for Infill wall ( 1st Stage ) ( Vertical ) ( Outer ) at Zone 1L , Axis 01AH - 01AI , Level 874.05 (
Concreting for Infill wall ( 1st Stage ) ( Vertical ) ( Outer ) at Zone 1L , Axis 01AH - 01AI , Level 874.05 (
Inspection Of Pipe Installation For Non-Potable Water (Irrigation Main Line); (200 mmØ- UPVC-Class-
Steel Reinforcement for Infill wall (outer) at Zone 1F , Axis 01Q-01R (as highlighted)
Concreting for Infill wall (Outer ) at Zone 1D, Between Axis 01K-01L , Level 876.00 (As Highlighted)
Concreting for RC Strip Footing ( Outer ) at Zone 1M From Axis 01AL to 01 AM (As Highlighted)
Concreting for RC Strip footing at North Administation Building ,Zone 2Q , Between Axis 02AX-02AY (
Shuttering for Infill wall (Outer ) at Zone 1D, Between Axis 01K-01L (As Highlighted)
Installation of Straight PVC Conduit (Dia. 25mm) and Boxes for Fire Alarm (Speaker) in the Promenade
Sand Cover and Protection for Low Current Lines (MH/WG/LC/12 to 15), Fire Alarm & Security (MH/WG/
Sand Cover and Protection for Electrical Lines of Emergency (MH/WG/EM/18 to 21) & Low Voltage (MH
Inspection of 9 Layer's Block work at Ground Floor for all walls, Inside Site Tower 5, as per the highl
Concrete Pouring for Blinding under Foundations of Internal Garden, Inside Aviary Garden, As per Hig
Sand Cover & Protection for Low Current Lines (MH/PG/LC/06-08, 11-13 & 19-21) and Fire Alarm & Sec
Sand Cover & Protection for Electrical Lines of Emergency (MH/PG/EM/15-16) and Low Voltage (MH/PG
Inspection & Compaction tests of Single Layer (Sub-Base) Backfilling above Low Current Lines (MH/PG
Inspection & Compaction tests of Single Layer (Sub-Base) Backfilling above Electrical Lines of Eme
Concrete Pouring for Blinding under Gabions along Boundary wall Inner side, (Between F.O.H and B.O.
Installed ETFE Cushions in Zone 2D between axis 02-L/02-M without Aluminum Caps.
Installation of direct buried UPVC conduit (dia.75mm) Low Voltage Ductbank (Normal Power) in
Installation of UPVC Conduit (2x110mm) Low Current Ductbank no. DD/D-TL/47 (TELECOM) in between
Installation of UPVC Conduit (2x110mm) Low Current Ductbank no.DD/D-FS/08 (Fire & Security) in bet
Installed Aluminum Caps between Axis 01/O - 01/P.
Installed Aluminum Caps between Axis 01/N - 01/O.
Installed Aluminum Caps between Axis 01/M - 01/N.
Installed Aluminum Caps between Axis 01/L - 01/M.
Installed Aluminum Caps between Axis 01/K - 01/L.
Installed Aluminum Caps between Axis 01/J - 01/K.
Installed Aluminum Caps between Axis 01/I - 01/J.
Installed Aluminum Caps between Axis 01/H - 01/I.
Installed Aluminum Caps between Axis 01/G - 01/H.
Installed Aluminum Caps between Axis 01/F - 01/G.
Installed Aluminum Caps between Axis 01/E - 01/F.
Installed Aluminum Caps between Axis 02/Q - 02/R.
Installed Aluminum Caps between Axis 02/P - 02/Q.
Installed Aluminum Caps between Axis 02/O - 02/P.
Installed Aluminum Caps between Axis 02/N - 02/O.
Installed Aluminum Caps between Axis 02/Ac - 02/AD.
Installed Aluminum Caps between Axis 02/AD - 02/AE.
Double layer of 20cm thick Block Workand single layer of 10mm thick block work around columns at ax
Double layer of 20cm thick Block Work and single layer of 10mm thick block work around columns at a
1st layer Block Work Laying for ETFE pump room # 6098 at zone 2H axis 02AA (as highlighted)
Inspectyion and Compaction test for 1st and 2nd layer of 3rd layers Back filling Under External Foundat
Level and Location for Diaphragm wall blinding under foundation at Zone 1B , Axis 01F (As Highlighted)
Level and Location for Energy Center for Footing Axis 14-16, L-R (As Highlighted) 871.70
Level and Location for Child Care Walls Upto Bottom of Suspended Slab, Walls W4-1no ) , W7-1 no at Zo
Level and Location for North Administation Building Coluimns ( C20_C29_C30_C31_C32_C33_C34_C35 ) ,
Level and Location for South small mosque , Parapet, Axis F-G, 1-3 TOC from 876.65 to 877.80 Zone 2B
Steel reinforcements for North Administration Building columns and wall zone 2Q up 873.725 C68,C43,
Anti termite for Diaphragm wall under blinding of foundation at Zone 1B , Axis 01F (As Highlighted)
Shuttering for Diaphragm wall blinding under foundation at Zone 1B , Axis 01F (As Highlighted) 868.10,
Shuttering and Concreting for Energy Center for Footing Axis 14-16/L-R (As Highlighted) 871.70
Steel reinforcement for Energy Center Beam at Axis 0-14, I--L (As Highlighted) TOC 881.50
Shuttering for Child Care Walls Upto Bottom of Suspended Slab, Walls W4-1no ) , W7-1 no at Zone 2N (
Concreting for Child Care Walls Upto Bottom of Suspended Slab, Walls W4-1no ) , W7-1 no at Zone 2N (
Steel Reinforcement for Diaphragm wall (vertical) (right side) at Zone 1E , Axis 01M (As Highlighted)
Steel Reinforcement for Diaphragm wall (vertical) (left side) at Zone 1E , Axis 01M (As Highlighted)
Concreting for Large Mosque Upper Second Floor Columns (C4 & C2A ) (4nos ) at Zone 1G , Axis ( 2 & 5,
Surface Preparation and Primer Coating for retaining wall at zone 6 & 7 foundations and wall upto level
1st and 2nd layer of 4mm thick modified bituminous waterproofing membrane for retaining wall at zone
Protection layer of 4mm thick bituminous protection board for retaining wall at zone 6 & 7 foundations
Geotextile and Screed protection for retaining wall at zone 6 & 7 top of foundations (as highlighted) axi
Installed ETFE Cushions in Zone 2E between axis 02-N/02-O without Aluminum Caps.
Shuttering for North Administation Building Coluimns ( C20_C29_C30_C31_C32_C33_C34_C35 ) ,Zone 2Q
Steel Reinforcements for South small mosque , Parapet, Axis F-G, 1-3 TOC from 876.65 to 877.80 Zone 2
Shuttering for South small mosque , Parapet, Axis F-G, 1-3 TOC from 876.65 to 877.80 Zone 2B (as high
Concreting for South small mosque , Parapet, Axis F-G, 1-3 TOC from 876.65 to 877.80 Zone 2B (as hig
Steel Reinforcements for Diaphragm wall Zone 2C Axis 02J (left) from 868.5 upto 871.98 (as highlighted)
Concreting for Mass concrete ( 1st Layer ) Under Strip footing at Zone 1J , Axis 01AA-01AD (As Highligh
Level and Location for Energy Center for foundation Axis 16-18/R (As Highlighted) Level upto 871.00
Level and Location for MCPE 2 Roof Slab at Zone 2K , Between Axis 02AE-02AF , TOC 875.974 (As Highli
Level and Location for Diaphragm wall Slab ( 1st Span ) at Zone 1E , Axis 01P , level 869.00 (As Highligh
Level and Location for Blinding under Central Bridge Abutment foundation at Zone 4 , Grid 02/AL (as hig
Level and Location for Large Mosque Upper Second Floor Columns (C4 & C2A ) (4nos ) at Zone 1G , Axis (
Level and Location for Kicker of Retaining wall , Axis 01W , at Zone 2 , (As Highlighted)
Inspection and Compcation test for 1st Layer of subgrade backfilling under EPDM for South Administrati
Inspection and Compaction test of 1st and 2nd Layer Gravel backfilling for Canopy Foundation , Axis 01C
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) inside the Boundary walls, @ Grid ( 0-
Inspection and Compaction test of 11th Layer of SubGrade backfilling for Retaining wall at Zone 2C Axis
Inspection and Compaction test of 3rd Layer of Subgrade backfilling for around Isolated footing of Cano
Excavation and Bed Preparation for Soak away drainage pipes uPVC 110 mm, included Pipes Sleeves
Inspection and compaction test for 4th and 5th Layer of Subgrade backfilling for Strip footing ( Outer )
3rd Coat of Cementitous water proof coating prior Stone Cladding for ZONE 2Q buttress, Infill wall & rin
"Inspection for Laying of Red Tiles and Warning Tape above the pipe for MV Line from C/MV/09 to C
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 4) for MV Line Pit C/MV/1
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 4) for MV Line Pit D/MV/18,
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 4) for MV Line Pit C/MV/10,
Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 5) for MV Line Pit C/MV/0
Inspection and Compaction test for backfilling Sub-garde 1st Layer (1 of 2) above Red Tiles for LV Line
Inspection of Sand bedding under pipe for Non-Potable Water Line at Zone-F&G - as highlighted (Stock P
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 2) above Sand Covering for No
Inspection and Compaction test for backfilling Sub-grade 5th Layer (5 of 8) for LV Line Pit K/LV/23, K/L
Inspection of Formwork and Concrete Pouring for Beam of Seating Area 3-23 at Zone-K - As Highlighted
Inspection and Compaction test for backfilling sub-grade 1st Layer (1 of 5) for Storm Water Line from
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 1) for Car Park-J (CPJ5 - ST. 0
Inspection and Compaction test for backfilling Sub-Base 1st Layer (1 of 2) for Car Park-J (CPJ4 - ST. 0+
Excavation for Fire & Security Distribution Line between C/FS/11 to C/FS/32 At Zone-C Including Pit C/FS
Excavation for Telecommunication Line between C/TL/58 and C/TL/33 at Zone-C Including Pit C/TL/32, C
Inspection of Excavation for MV Line form C/MV/21 to C/MV/31 including Pit C/MV/36 at Zone-C - as hig
Inspection of Steel Reinforcement for Beam of Seating Area 3-21, 3-22, 3-23, 3-26 at Zone-G&K - As Hig
Inspection and Compaction test for backfilling Sub-grade 3rd Layer (3 of 3) for Parking Area CPH @ Zone
Inspection for Casting the Blinding Concrete under the Manhole MH-G-08, MH-G-09, MH-G-10, MH-G-10
Inspection of Excavation for MV Line form C/MV/18 to C/MV/44 at Zone-C - as highlighted
Inspection of Excavation for RO Water Line at Zone-G - As highlighted
Inspection and Compaction test for backfilling Sub-grade 2nd Layer (2 of 2) for Parking Area CPH @ Zone
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 4) above Red Tiles for MV Li
Inspection for Laying of Red Tiles and Warning Tape above the pipe for MV Line from C/MV/43 to C/MV/
Surface Preparation prior to start Blinding Concrete under Beam of Seating Area 1-17 at Zone-K - As Hig
"Inspection of Formwork and Concrete Pouring for Beam of Seating Area 3-21 & 3-22 at Zone-G - As Hig
Inspection of Formwork and Concrete Pouring for Footing of Sub-station - R12, R2, R5 at Zone-B,F&G - a
Inspection of Excavation for RO Water Line Pit POC-01 & POC-02 at Zone-B - As highlighted
Installation of straight UPVC Conduit (Dia. 160mm) Low Voltage Ductbank no. DD/D-LV/21 (D/LV/07 to
Installation of direct buried UPVC conduit (dia.75mm) Low Voltage Ductbank (Emergency) in be
Installed ETFE Cushions (without aluminum caps) between axis 01-E/01-F.
Installed ETFE Cushions in Zone 2E between axis 02-O/02-P without Aluminum Caps.
Concrete pouring & shuttering for Footing of Water feature Pump Room along Boundary wall, at Butter
Coordinates & Levels for Slab & Walls of Cabin Room, ETFE Pump Room and Remaining Boundary walls,
Installed ETFE Cushions in Zone 2E between axis 02-P/02-Q without Aluminum Caps.
Installed ETFE Cushions (without aluminum caps) between axis 01-H/01-I.
Surface Preparation and Chipping Prior to Plastering for walls (Inner Surfaces) at 1st Floor, Inside Si
Surface Preparation prior to Backfilling Between 1st & 2nd line of boulders at Right side of Geyser, (
Single Layer 4mm thk. Modified Bitumenous Water proofing Membrane for Wall & Foundation (Outer s
Solvent Base Primer Coating prior to Membrane Water proofing for Wall & Foundation (Outer surface)
Concrete Pouring & Shuttering for Slab & Walls of Cabin Room, ETFE Pump Room and Remaining Boundar
Steel Reinforcement for Roof Slab with Upstand and Parapet walls at Roof and 1st Floor stairs, at Sit
iNSTALLED 2 ETFE Cushions (2E 28, 2E 29) as highlighted in attached drawing.
Pre insulated Heat Fittings, ( laying ,Aligment ,Leveling and fit up) Heat Fittings 150mmØ. (E:64
Installed 4 ETFE Cushions (2E 45, 46, 48, 49) as highlighted in attached drawing.
Mechanical Pipe sleeves Installation Infill Wall ,For (FF,PW,NON PW,FW) Between Axis (01/2,01R to
iNSTALLED 2 ETFE Cushions (2E 63, 64) as highlighted in attached drawing.
Installed ETFE Cushions No. 1C 18 as highlighted in attached drawing.
Steel Reinforcement for Foundation & Wall Starter of Wet Well Beside Water Feature, at Managem
Installed 1 ETFE Cushions (2D 24) as highlighted in attached drawing.
iNSTALLED 2 ETFE Cushions (1B 15, 1B 17) as highlighted in attached drawing.
Surface Preparation and Primer Coating for above Blinding Under Diaphragm Wall Foundation , Grid 02/
Concreting for MCPE 2 Roof Slab at Zone 2K , Between Axis 02AE-02AF , TOC 875.974 (As Highlighted)
Shuttering for MCPE 2 Roof Slab at Zone 2K , Between Axis 02AE-02AF , TOC 875.974 (As Highlighted)
Steel reinforcements for MCPE 2 Roof Slab at Zone 2K , Between Axis 02AE-02AF , TOC 875.974 (As High
Shuttering for Large Mosque Upper Second Floor Columns (C4 & C2A ) (4nos ) at Zone 1G , Axis ( 2 & 5 /
Protection Layer of Geotextile and Screed for above Blinding Under Diaphragm Wall Foundation , Grid
Concreting for Diaphragm wall Slab ( 1st Span ) at Zone 1E , Axis 01P , level 869.00 (As Highlighted)
Shuttering for Diaphragm wall Slab ( 1st Span ) at Zone 1E , Axis 01P , level 869.00 (As Highlighted)
Steel Reinforcement for Diaphragm wall Slab ( 1st Span ) at Zone 1E , Axis 01P , level 869.00 (As Highlig
Steel reinforcement for Energy Center for Footing Axis 14-16/L-R (As Highlighted)
Concrete Pouring for Blinding under Fountain 2 (1 nos) (Outer) Right Side, Inside Physic Garden as hi
Shuttering and Concreting for Energy Center for foundation Axis 16-18/R(As Highlighted) Level upto 87
Stack Boulders Installed Layers at level +875.90, 876.30, 876.70, 877.10 & 877.50, along Open Channe
Steel reinforcement for Energy Center for foundation Axis 16-18/R(As Highlighted) Level upto 871.00
Stack Boulders Installed Layer at levels +879.500 , along Open Channel (Boundary wall Side), at Wadi
Concreting for Diaphragm wall at Zone 1M 1N , Axis 01AM , level From 872.5 to 877.0 (As Highlighted)
Concreting for Large Mosque Lower Second Floor Beam ( 137A ) for, Zone 1G , Axis ( 2-5 / E ) Level upto
Single Layer of 4mm thick Modified Bituminous WaterProofing Membrane for above Blinding Under Dia
Inspection & Compaction tests of Single Layer (Sub-Base) Backfilling above Warning Tiles & Tape for
Inspection & Compaction tests of Single Layer (Sub-Base) Backfilling above Warning Tiles & Tape for
Warning Tiles & Tape above Sand Cover for Low Current Lines (MH/PG/LC/02-16) and Fire Alarm & Secu
Warning Tiles & Tape above Sand Cover for Electrical Lines of Emergency (MH/PG/EM/02-12) and Low
Sand Bedding for Water Feature Line (Pipes dia 160, 200, 250 & 300mm) Connecting to Wet Well (E),
Inspection of 6th layer Gravel Backfilling (50cm ht) surround the Foundation & Wall of Wet Well E, In
Inspection of 4th layer Gravel Backfilling (50cm ht) surround the Foundation & Wall of Wet Well F, In
Concrete Pouring & Shuttering for Lintels and Stiffener Columns of Block work & Doors for Walls of
Excavation for Landscaping between Geyser Garden and Boundary wall, inside Water Garden, at hig
Inspection of Excavation for Tree Pit (33 No's) as Details D-38-1 near Butterfly Garden - as highlighted
Inspection of Grouting (Horizontal & Vertical Joints) for Rock Boulder - WRB-56 for All Layers
Surface Preparation prior to start backfilling for MV Line Pit C/MV/19, C/MV/31, C/MV/44, C/MV/4
Inspection for Cut and Removal of Disposal Material existing from Phase-2 in Wadi Garden (Crescent ar
'Warning Tape For Non-Potable Water (Irrigation Main Line); (200 mmØ- UPVC-Class-5 ) ; As per Hig
Inspection and Compaction test for backfilling sub-grade 4th Layer (4 of 5) for Storm Water Line fr
'Warning Tape For Non-Potable Water (Irrigation Main Line); (200 mmØ- UPVC-Class-5 ) ; As per Hig
Inspection of Sand bedding under pipe for RO Water Line at Zone-C - As highlighted (Stock Pile# 159)
Warning Tape For Non-Potable Water (Irrigation Main Line); (200 mmØ- UPVC-Class-5 ) ; As per Hig
Inspection of Sand Covering Layer for Protection of MV Line from B/MV/22 to B/MV/14 at Zone-B - as hi
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 2) above Sand covering for Hea
Inspection and Compaction test for backfilling Sub-grade 3rd Layer (3 of 8) for Non potable water line
Inspection and Compaction test for backfilling Sub-grade 4th Layer (4 of 8) for LV Line Pit K/LV/05, K/L
Inspection of Formwork and Concrete Pouring for Slab of MV Line Pit - C/MV/10, C/MV/25, H/MV/27 a
Inspection of Steel Reinforcement for Slab of MV Line Pit - C/MV/10, C/MV/25, H/MV/27 at Zone-C&H
Inspection and Compaction test for backfilling Sub-Base 1st Layer (1 of 2) for Car Park-J (CPJ3 - ST. 0+
Level and Location for Diaphragm wall for ( 2nd Span ) from Kicker upto Level 868.75 at Zone 1E , Axis 01
Surface Preparation prior to start backfilling for MV Line Pit C/MV/10, C/MV/25 at Zone- C - As Highl
Level and Location for MCPE 2 wall and counter fort at Zone 2H Between axis 02AA to 02AB , Level 871.
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 5) for MV Line Pit C/MV/0
Level and Location for Diaphragm wall at Zone 1M 1N , Axis 01AM , level From 872.5 to 877.0 (As High
Inspection of Excavation for LV Line from B/LV/49 to F/LV/22 at Zone-B&F including Pit - B/LV/49, B/LV
Level and Location for Infill wall at Zone 2B, Axis 02G , Level upto 872.3 (As Highlighted)
Inspection of Excavation for Non-Potable Water Line at Zone-C&D - as highlighted
Surface Preparation Prior to start Back filling Under External Foundation of MCPE 2 , Axis 03W / 03(2)-03
"Inspection of Formwork and Concrete Pouring for Beam of Seating Area 3-25 & 3-26 at Zone-K - As Hig
Inspection and Compaction test for 7th layer of backfilling for MCPE 1 duct tunnel wall and Buttress (
Surface Preparation prior to start Backfilling for Energy Center ( 1 Meter away from Boundary Wall Fou
Excavation and Surface Preparation under Bottom Slab of Duct tunnel at MCPE 1 , Zone 2M 2N ( As Highl
Inspection of Blinding Concrete under Heating & Chilled Water Line Isolation Pit for F/DH/04, F/DC/01,
Inspection of Blinding Concrete under Heating & Chilled Water Line Isolation Pit for G/DH/02, G/DH/
Filed joint jacketing for Pre-insulated Chilled Water Pipes (dia 200mmØ, 250mmØ,400mmØ) at Zone
Mechanical Pipe sleeves Installation ,For (FF,PW,NON PW) At Axis (02/J ) At Crescent 2 Zone (2C) ;
Installation of UPVC conduit (dia. 75mm) Low Current Ductbank (TELECOM) in between Manholes (M
Installation of UPVC conduit (dia. 75mm) Low Current Ductbank (Fire & Security) in between Manho
Installation of Rock and Boulder No. WRB-56 - 4th layer (4 of 6)
Pipe Installation of Trees Sub-Surface Drainage (Main Line & Branches) Pipes; ( Perforated110 mmØ
Bedding of Gravel 3/8" and Geotextile Surrounding Pipe Installation of Trees Sub-Surface Drainage
Concrete pouring & shuttering for Footing of Water feature Pump Room along Boundary wall, at Butter
Concreting for Infill wall at Zone 2B, Axis 02G , Level upto 872.3 (As Highlighted)
Concreting for Diaphragm wall for ( 2nd Span ) from Kicker upto Level 868.75 at Zone 1E , Axis 01P , (As
Shuttering for Devonian Garden ( AHU ROOM ) for SOG and Concrete Pad at Zone 2M ,Axis 02 AL -02 AM
Shuttering for MCPE 2 wall and counter fort at Zone 2H Between axis 02AA to 02AB Level 871.00 (as hi
Concreting for MCPE 2 wall and counter fort at Zone 2H Between axis 02AA to 02AB Level 871.00 (as h
Shuttering for Child Care Columns and Walls Upto Bottom of Suspended Slab , Columns ( C2 ( 8nos ) C1 (
Concreting for Child Care Columns and Walls Upto Bottom of Suspended Slab , Columns ( C2 ( 8nos ) C1 (
Shuttering for Kicker of Retaining wall and Wall , Axis 01W , at Zone 2 , (As Highlighted)
Steel Reinforcement for Kicker of Infill wall ( Inner ) at Zone 2F , Axis 02S-02T , Level upto 868.95 (As H
Concreting for Kicker of Retaining wall and Wall , Axis 01W , at Zone 2 , (As Highlighted)
Shuttering for Kicker of Infill wall ( Inner ) at Zone 2F , Axis 02S-02T , Level upto 868.95 (As Highlighted)
Shuttering for Diaphragm wall at Zone 1M 1N , Axis 01AM , level From 872.5 to 877.0 (As Highlighted)
Concreting for Infill wall Stiffner ( inner ) BII-11 , at Zone 1C at Axis 01I (As Highlighted)
Shuttering for Infill wall at Zone 2B, Axis 02G , Level upto 872.3 (As Highlighted)
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 2) above Red Tiles for MV Li
Inspection of Excavation for MV Line from F/MV/01 to G/MV/20 at Zone-F&G - as highlighted
Inspection of Sand Covering to protect the pipe for Non-Potable Water Line at Zone-C - as highlighted (S
Inspection of Sand bedding under pipe for Non-Potable Water Line at Zone-C&D - as highlighted (Stock P
Inspection and Compaction test for backfilling sub-grade 3rd Layer (3 of 5) for Storm Water Line fr
Inspection of Sand Covering to protect the pipe for Non-Potable Water Line at Zone-G - as highlighted (
Inspection for Laying of Red Tiles and Warning Tape above the pipe for LV Line from K/LV/41 to K/LV/05
Inspection and Compaction test for backfilling Sub-grade 2nd Layer (2 of 8) for Non potable water line
Inspection and Compaction test for backfilling Sub-grade 3rd Layer (3 of 8) for LV Line Pit K/LV/05, K/L
Inspection of Sand bedding under pipe for LV Line from F/LV/22 to F/LV/02 at Zone-F - as highlighted (S
Inspection and Compaction test for backfilling Sub-Grade 1st Layer (1 of 1) for Car Park-J (CPJ2 ST. 0+0
Inspection for Installation of MV Line Junction Pit - C/MV/35 - as highlighted
Inspection for Installation of Stone Cladding without Copping for Seating Area 3-31, 3-32, 3-33, 3-34 a
Surface Preparation prior to start backfilling for RO water line Pit ROW-ISC-13, POC-24 at Zone-B&L - A
Pre insulated Heat & Chilled Pipes, ( laying ,Aligment ,Leveling and fit up) Heat Pipes 80mmØ. f
Pre insulated Heat & Chilled Pipes, ( laying ,Aligment ,Leveling and fit up) Heat Pipes 200mmØ. A
Filed joint jacketing for Pre-insulated Chilled Water Pipes (dia 200mmØ) at Zone L. From Point (E:
Filed joint jacketing for Pre-insulated Chilled Water Pipes dia150 mmØ) at Zone F. From Point (E:
Surface Preparation prior to start backfilling for LV Line Pit B/LV/54, B/LV/36, B/LV/35, B/LV/34, B/LV/
Inspection of Concrete (Plain) Pouring for the Duct Bank of MV Line from L/MV/16 to L/MV/02 at Zone-L
Inspection and Compaction test for backfilling sub-grade 2nd Layer (2 of 5) for Storm Water Line fr
Inspection and Compaction test for backfilling Sub-grade 4th Layer (4 of 6) around MV Line Pit - D
Inspection of Sand bedding under pipe for Heating & Chilled Water Line at Zone-L including branch - as
Inspection and Compaction test for backfilling Sub-grade 2nd Layer (2 of 8) for LV Line Pit K/LV/05, K/L
'Pipe Installation (315mm Ø- UPVC Pipes-Class 4 ) for Storm Water pipe Out Fall-O including CB(6-O-1, 2,
'Pipe Installation (400mm Ø- UPVC Pipes-Class 4 ) for Storm Water pipe Out Fall-G including (MH-G-
Excavation for Storm Water Line from MH-Y-02 to G-Y-03 at Zone-2 including Manhole MH-Y-03 and Gulli
'Bedding of Gravel 3/8" and Geotextile surrounding in pipes (315mm Ø- UPVC Pipes-Class 4 ) for Storm Wa
Inspection of Excavation for Storm Water Line-Q All lines including all branch, Manholes and Gullies at Z
'Bedding of Gravel 3/8" and Geotextile surrounding in pipes (400mm Ø- UPVC Pipes-Class 4 ) for St
Inspection of Sand bedding under pipe for MV Line from L/MV/15 TO L/MV/04 at Zone-L - as highlighted
Surface Preparation prior to start backfilling for MV Line Pit C/MV/35 at Zone- C (As Highlighted)
Inspection of Steel Reinforcement for Beam of Seating Area 3-26 at Zone-K - As Highlighted
Inspection and Compaction test for backfillinh sub-grade 2nd Layer (2 of 3) above Sand Covering for No
Inspection of Backfilling Soil Mix (70%Sand, 10%Sweet Soil, 10% Organic material, 10% Perlite) for Tree
Inspection of Backfilling Gravel 1st Layer (1 of 1) and Geotextile for Tree Pits inside the Seating Area 1
Surface Preparation prior to start Blinding Concrete under Stone Edger for side walk at Zone-K - As High
Inspection of Excavation for Tree Pit (107 No's) as Details D-38-1 near Car Parking-J - as highlighted
Installation of straight UPVC Conduit (Dia. 160mm) Medium Voltage Ductbank no. BB/D-MV03 (B/MV
Installation of PVC Conduit (Dia. 25mm) and boxes for Lighting System (LED L0) at the South Small M
Installation of UPVC Conduits (Dia. 110mm) for Voice & Data Ducts (TC Site Network) in the Promenad
Installation of UPVC Conduits (Dia. 110mm) for Fire Alarm (FS Site Network) in the Promenade & Cano
Excavation and Bed Preparation for Soakaway pipes sleeves drainage pipes UPVC 160 mm, Dia at Garden
Surface preparation Prior to start backfilling for Canopy Foundation , Axis 01C-01J , Plant Area 1 , Zone
Level and Location for RC Strip Footing at Zone 1K , Axis 01AD-01AE-01AF (As Highlighted)
Level and Location for MCPE 2 Ground Floor Slab at Zone 2H, Between Axis 02AA_03I-1 , Level 871.00 (
Level and Location for Child Care blinding under SOG at Zone 2N axis 02AR (As Highlighted) TOC 870.47
Level and Location for Infill wall TIP ( Upper Part ) at Zone 1A , Axis 01A to TIP , Level 874.26 (As Highli
Level and Location for Mass concrete ( 1st Layer ) Under Strip footing at Zone 1J , Axis 01AA-01AD (As
Level and Location for Infill wall Stiffner ( inner ) BII-11 , at Zone 1C at Axis 01I (As Highlighted)
Level and Location for Child Care Columns Columns ( C1 ( 4 nos ) C2 ( 8 nos ) ) , at Zone 2N , Upto Botto
Level and Location for Mass concrete ( 2nd Layer ) under RC Strip Footing at Zone 1K , Axis 01AE-01AF (
Level and Location for Blinding under Grade Beam at Energy center at Axis 21-29/N-Q ,( As Highlighted)
Level and Location for North Administration Building, Concrete pad and Upstand on roof floor at Zone 2
Concreting for Diaphragm wall ( Vertical )at Zone 1E Axis 01M (As Highlighted) Upto Level 868.50
Steel Reinforcement for RC Strip Footing at Zone 1K , Axis 01AD-01AE-01AF (As Highlighted)
Shuttering for RC Strip Footing at Zone 1K , Axis 01AD-01AE-01AF (As Highlighted)
Concreting for RC Strip Footing at Zone 1K , Axis 01AD-01AE-01AF (As Highlighted)
Steel Reinforcements for Infill Perimeter wall at Zone 1L at Axis 01AI-01AJ ,TOC 876.00 ( As Highlighted)
Shuttering for Diaphragm wall for ( 2nd Span ) from Kicker upto Level 868.75 at Zone 1E , Axis 01P , (As
Concreting for Devonian Garden for SOG and Concrete Pad at Zone 2M ,Axis 02 AL -02 AM (as highlighte
Steel reinforcements for MCPE 2 Ground Floor Slab at Zone 2H , Between Axis 02AA_03I-1 , Level 871.0
Shuttering for MCPE 2 Ground Floor Slab at Zone 2H , Between Axis 02AA_03I-1 , Level 871.00 (as highl
Concreting for MCPE 2 Ground Floor Slab at Zone 2H , Between Axis 02AA_03I-1 , Level 871.00 (as highl
Anitermite Under Mass concrete Under Strip footing at Zone 1J , Axis 01AA-01AD (As Highlighted)
Shuttering for Mass concrete ( 1st Layer ) Under Strip footing at Zone 1J , Axis 01AA-01AD (As Highlight
Shuttering for Infill wall Stiffner ( inner ) BII-11 , at Zone 1C at Axis 01I (As Highlighted)
Shuttering for Infill wall TIP ( Upper Part ) at Zone 1A , Axis 01A to TIP , Level 874.26 (As Highlighted)
Concreting for Infill wall TIP ( Upper Part ) at Zone 1A , Axis 01A to TIP , Level 874.26 (As Highlighted)
Concreting for Mass concrete ( 2nd Layer ) under RC Strip Footing at Zone 1K , Axis 01AE-01AF (As Highl
Shuttering and Concreting for Blinding under Grade Beam at Energy center at Axis 21-29/N-Q ,( As Highl
Surface Preparation and Primer Coating above Blinding under RC Strip Footing at Zone 1K , Axis 01AD-AF
Single Layer of 4mm thick Modified Bituminous WaterProofing Membrane above Blinding under RC Strip
Protection Layer of Geotextile and Screed above Blinding under RC Strip Footing at Zone 1K , Axis 01AD-
Installation of straight PVC Conduit (Dia. 25mm) & Boxes for Lighting System (Presence Detector) at F
Installation of straight PVC Conduit (Dia. 25mm) & Boxes for Lighting System (LED N, W1, W1/E) at Gr
Installation of straight UPVC Conduit (Dia. 160mm) Medium Voltage Ductbank no. HH/D-MV09 (H/MV/
Installation of straight UPVC Conduit (Dia. 110mm) Low Voltage Ducts (Submain Cables) at Promen
Steel Reinforcement for Wall of Mechanical Manhole, at Grid (F-H/10-11), at Management and Mainte
Steel Reinforcement for Dome of New Ticketing Booth # 5A, As per Attached Highlighted Drawing's.
Screed protection on Blinding under Wet Well C, at Management and Maintenance Building, As Highl
Geo Textile on Blinding under Wet Well C, at Management and Maintenance Building, As Highlighted
Single Layer 4mm thk. Modified Bitumenous Water proofing Membrane on Blinding under Wet Well C
Surface preparation & Solvent Base Primer Coating on Blinding under Wet Well C, at Management and
Gravel (Drainage) & Geo Textile (Filter membrane Terrain 1000) for Tree Pits (20 no's) between Bou
Inspection & Compaction tests of Single Layer (Sub-Base) Backfilling on Low Current Lines (MH/WG/L
Inspection & Compaction tests of Single Layer (Sub-Base) Backfilling on Electrical Lines of Emerg
Coordinates & Levels of Blinding under Fountain 2 (1 nos) (Outer) Right Side, Inside Physic Garden as
Coordinates & Levels of Wall of Seat walls (3 no's) Inside Outer canopy 2, at Physic Garden, as highli
Sand Bedding for Water Feature Line of Equalizer Pipes (dia 300mm) Between Wet Well E & F, Inside
Inspection & Compaction Tests for 3rd (final) Layer (Sub Base) Backfilling Inside Outer Canopy 1, Insi
Inspection & Compaction tests of Single Layer (Sub-Base) Backfilling Between 3rd & 4th line of boulde
Inspection of 5th layer Gravel Backfilling (50cm ht) surround the Foundation & Wall of Wet Well E, In
Inspection of 3rd layer Gravel Backfilling (50cm ht) surround the Foundation & Wall of Wet Well F, In
Inspection & Compaction tests of 3rd (Final) Layer Backfilling (Sub-Grade) under Fountain 2 (1 nos) (O
Installation of PVC Conduit (Dia. 25mm) & Boxes for Fire Alarm (Flash Beacon) at Ground Floor Chiled
Inspection of 2nd Layer Gravel Backfilling (50cm ht) for Sub Surface Drainage Pipes (for Trees), At 5
Inspection of 1st Layer Gravel Backfilling (50cm ht) for Sub Surface Drainage Pipes (for Trees), At 5 p
Protection Layer of 4 mm Thk. Bituminous Protection Board for External Surfaces of Wet Well E (All Si
Protection Layer of 4 mm Thk. Bituminous Protection Board for External Surfaces of Wet Well F (All Si
Concrete Pouring & Shuttering for Wall of Seat walls (3 no's) Inside Outer canopy 2, at Physic Garden,
Pre insulated Chilled water Pipes 150mmØ ( laying ,Aligment ,Leveling and fit up) From point (E:64
Shuttering for Mass concrete under RC Strip Footing at Zone 1K , Axis 01AE-01AF (As Highlighted)
Steel reinforcements for North Administration Building ,Concrete pad and Upstand on roof Floor ,at Zon
Shuttering for North Administration Building, Concrete pad and Upstand on roof floor at Zone 2R ,Axis
AntItermite under Blinding under Grade Beam at Energy center at Axis 21-29/N-Q (as highlighted)
Concreting for Infill wall Stiffners ( 2nos ) ( inner ) BII-14 & BII-15 , at Zone 1D at Axis 01K & 01L (as hi
Concreting for Infill wall (Inner) of Zone 2K at Axis 02AG-02AF ( As Highlighted)
Installation of PVC Conduit (Dia. 25mm) and Boxes for Security (Card Redaer, Break Glass for Emergen
Concreting for Large Mosque WALL ( W 6 ) for, Zone 1G , Axis ( 3-3.2/B ) Level upto 873.30 & 874.50 (As
Concreting for North Administration Building Columns ( C1, C1A ,C2 , C3 , C4 , C5 , C6 , C7 , C8 , C21 , C2
Concreting for Cafeteria (undercroft) Wall (W 19) as highlighted, upto 869.100 zone 2A (KAIG3-SCR-CF
Concreting for Retaining wall, from Axis 01E-01F ,at Zone 5 , (As Highlighted)
Concreting for Large Mosque for ( Lower Second Floor ) for Slab & Beams , Zone 1G (As Highlighted) Up
Concreting for Infill wall ( 1st Stage ), at Zone 1L ,between Axis 01AG -01AH ,TOC : 874.05 (as highlighte
Inspection for Installation of Stone Cladding without Copping for Seating Area 3 - 25 at Zone-K (As Highl
"Inspection for application of Base Primer and Bituminous Damp Proofing (1st & 2nd Coat) for Canopy
Surface Preparation prior to start waterproofing for Canopy Foundation and Column Neck of Seating Ar
Inspection of Sand Covering Layer for Protection of Fire & Security Line between E/FS/11 and E/FS/02
Inspection of Sand Covering Layer for Protection of Telecommunications Line between E/TL/01 and E/TL/
Inspection of Sand Covering for protection of pipe for LV Line between D/LV/09 and E/LV/02 at Zone-E -
Inspection of Sand bedding under pipe for Fire Water Line at Zone-2 including branch - as highlighted (
Inspection of Sand bedding under pipe for Potable Water Line at Zone-2 - as highlighted (Stock Pile# 15
"Inspection and Compaction test for backfilling Sub-Grade 1st Layer (1 of 1) for Car Park-J (CPJ3 ST. 0
Surface Preparation prior to start backfilling for Car Park-J (CPJ5 ST. 0+020 to 0+140, CPJ6 ST. 0+010 t
Inspection and Compaction test for backfilling sub-grade 1st Layer (1 of 5) for Storm Water Line fro
Inspection of Excavation for RO Water Line at Zone-C including Pit ROW-ISC-12 - As highlighted
"Inspection of Sand bedding under pipe for LV Line at Zone-F&G - as highlighted (Stock Pile# 159) "
Inspection for Installation of LV Line Pit - F/LV/01, F/LV/12, F/LV/18, F/LV/14, F/LV/05, G/LV/60, G/LV/
Inspection of Blinding Concrete under LV Line Pit - B/LV/49, B/LV/17, B/LV/56, F/LV/02, F/LV/ 10, F/LV/
Inspection of Blinding Concrete under Sub-station - R5 and R6 at Zone-G&K - as highlighted
Inspection of Sand Covering Layer for Protection of Fire & Security Line between SBC and E/FS/01 at Z
Inspection of Sand Covering Layer for Protection of Telecommunications Line between SBC and E/TL/09
Inspection of Sand Covering for protection of pipe for LV Line between SBC and E/LV/01 at Zone-D&E - a
Inspection of Sand bedding under pipe for Fire Water Line at Zone-2 - as highlighted (Stock Pile# 159)
Inspection of Sand bedding under pipe for Potable Water Line at Zone-2 - as highlighted (Stock Pile# 15
Inspection of Sand bedding under pipe for Non-Potable Water Line at Zone-C&D including branch - as hi
Inspection and Compaction test for backfilling Sub-grade 3rd Layer (3 of 6) around MV Line Pit - D
"Inspection and Compaction test for backfilling sub-grade 4th Layer (4 of 8) for Heating and Chilled wa
Inspection of Excavation for RO Water Line from POC-00 to ROW-ISC-02 and ROW-ISC-03 at Zone-F&G
Inspection and Compaction test for backfilling Sub-grade 2nd Layer (2 of 4) above Sand covering for Hea
1st Layer of Solid Block Work for First Floor at South small mosque Axis 2-4/ B , 2-4/ D, 5-7/B , 5-7 /D a
Block Work from 1st Layer to slab for First Floor at South small mosque Axis 2-4/ B , 2-4/ D, 5-7/B , 5-7
Level and Location for S.O.G of ETFE pump Room # 6098 in Zone 2H , Axis 01AA , F.F.L 869.79 (as hig
Level and Location for Retaining wall, from Axis 01E-01F ,at Zone 5 , (As Highlighted)
Level and Location for South Small Mosque for Dome and Beam ( B6 & B7 ) , Zone 2B , Axis 4-6/B-D , L
Level and Location for Large Mosque Lower Second Floor Wall ( W3 ) and Column ( C5 ) at Zone 1G , Axis
Level and Location for Large Mosque Lower Second Floor Wall ( W1 ) for, Zone 1G , Axis ( 1-2 / D-E ) Le
' Soak away Pipe Installation of Drain pipes including sleeves under strip footing (160&110mmØ -
' Soak away Pipe Installation of Drain pipes including sleeves under strip footing (160&110mmØ - U
'Bedding of Gravel 3/8" and Geotextile Surrounding Soak away Pipe Installation of Drain pipes incl
'Bedding of Gravel 3/8" and Geotextile Surrounding Soak away Pipe Installation of Drain pipes incl
Excavation & Surface preparation for Plantation area's with Tree Pits along Outer Seat wall, Inside
Steel Reinforcement for Wall of Decant Sump-D3 at Mist Garden, inside Water Garden as highlighte
Warning Tiles & Tape above Sand Cover for Low Current Lines (MH/PG/LC/13-16) and Fire Alarm & Secu
Warning Tiles & Tape above Sand Cover for Electrical Lines of Emergency (MH/PG/EM/9-12) and Low V
Sand Cover & Protection for Low Current Lines (MH/PG/LC/02-16) and Fire Alarm & Security lines (MH
Sand Cover & Protection for Electrical Lines of Emergency (MH/PG/EM/02-12) and Low Voltage (MH/PG
Installation of PVC Conduit (Dia.25mm) & Boxes for Voice Data (WIFI) at Ground Floor Chiled Care Cr
Installation of PVC Conduit (Dia.25mm) & Boxes for Fire Alarm (Flash Beacon) at Ground Floor Chiled
Installation of PVC Conduit (Dia. 25mm) and Boxes for Fire Alarm (Break Glass, Interface Unit) at Gro
Inspection and Compaction test of 5th Layer of Backfilling in Energy Center, Axis 25-29/N-Q (As Highlight
Inspection and Compaction test for 6th layer of backfilling for MCPE 1 duct tunnel wall and Buttress (
Inspection and compaction test for 5th and 6th layer of Subgrade Backfilling for Diaphragm wall Foundat
Inspection and Compaction test of 2nd Layer of Subgrade backfilling for around Isolated footing of Cano
Inspection and Compaction test of 9th and 10th Layer of SubGrade backfilling for Retaining wall at Zone
Inspection and compaction test for 2nd and 3rd Layer of Subgrade backfilling for Strip footing ( Outer )
Inspection and Compaction test of 4th Layer of Backfilling in Energy Center, Axis 19-28/N-Q (As Highlight
Shuttering for S.O.G of ETFE pump Room # 6098 in Zone 2H , Axis 01AA , F.F.L 869.79 (as highlighted)
Concreting for S.O.G of ETFE pump Room # 6098 in Zone 2H , Axis 01AA , F.F.L 869.79 (as highlighted
Shuttering for Retaining wall, from Axis 01E-01F ,at Zone 5 , (As Highlighted)
Concreting for Infill wall (Inner) at Zone 1D at Axis 01K-01L (1st Stage) ( As Highlighted)
Steel Reinforcement for S.O.G of ETFE pump Room # 6098 in Zone 2H , Axis 01AA , F.F.L 869.79 (as hi
Steel Reinforcement for South Small Mosque for Dome and Beam ( B6 & B7 ) , Zone 2B , Axis 4-6/B-D (As
Shuttering for South Small Mosque for Dome and Beam ( B6 & B7 ) , Zone 2B , Axis 4-6/B-D (As Highlight
Concreting for Large Mosque Lower Second Floor Wall ( W3 ) and Column ( C5 ) at Zone 1G , Axis ( 1-2 /
Steel Reinforcement for Retaining wall for Kicker and Wall , Axis 01W-01X , 01Y-01Z ,at Zone 2 , (As High
Steel Reinforcement for Infill wall ( 1st Stage ) ( Vertical ) ( Outer ) at Zone 1L , Axis 01AH - 01AI , Level
Concreting for 2nd floor Roof Slab at south small mosque , Zone 2B , Axis F-G, 1-3 (as highlighted) S
Steel Reinforcements for North Administration Building Columns C( 39-40-41-44--45-46-47-48-52-53-54-
Steel Reinforcement for Retaining wall, from Axis 01E-01F ,at Zone 5 , (As Highlighted)
Shuttering for Large Mosque Lower Second Floor Wall ( W1 ) for, Zone 1G , Axis ( 1-2 / D-E ) Level from
Shuttering for Large Mosque Lower Second Floor Wall ( W3 ) and Column ( C5 ) at Zone 1G , Axis ( 1-2 /
Steel reinforcements for perimeter wall upper part for TIP zone 2R Axis 02BC to tip, (as highlighted)
Steel Reinfocements for Diaphragm wall ( Inclined ) ( 1st Span) at zone 1E Axis 01P (As Highlighted)
Shuttering for MCPE 2 Wall & Counterfort , Axis 03K-02AE, Zone 2J (As Highlighted )
Installation of UPVC conduit (2x75mm) Low Current Ductbank (TELECOM) in between Manholes (MH/W
Installation of UPVC conduit (2x75mm) Low Current Ductbank (Fire & Security) in between Manhole
Installation of direct buried UPVC conduit (dia.75mm) Low Voltage Ductbank (Small Power Ckt. & Nor
Installation of direct buried UPVC conduit (dia.75mm) Low Voltage Ductbank (Emergency) in betwee
Installation of Low Voltage Ductbank UPVC Conduit 75mm (Emergency) in between Manhole (MH/WG/
Installation of Low Voltage Ductbank UPVC Conduit 75mm (Lighting Ckt.) in between Manhole (MH/WG
Installation of straight PVC Conduit (Dia. 25mm) & boxes for Lighting System (Lighting Switch) at Gro
Installation of straight UPVC Conduit (Dia. 160mm) Medium Voltage Ductbank no. HH/D-MV/04 (H/MV
Pre insulated Chilled water Pipes 200mmØ ( laying ,Aligment ,Leveling and fit up) From point (E:64
Pipe Installation (400mm Ø- UPVC Pipes-Class 4 ) for Storm Water pipe Out Fall-O including (MH-O
Pipe Installation of Sub-Surface Drainage (Main Line & Branches) Pipes; ( PP 250,160,110 mmØ, ) at
Installation of Puddle Flange Pipes; (110&160&200&250mmØ UPVC CLASS 5) ; For Decant Sump at W
'Bedding of Gravel 3/8" and Geotextile surrounding in pipes (400mm Ø- UPVC Pipes-Class 4 ) for St
Level and Location for Retaining wall from Axis 02C-02E Zone 6&7 , (As Highlighted)
Level and Location for Infill wall ( inner ) ( Stage 2 ) at Zone 1D at Axis 01J-01K (as highlighted)
Level and Location for Infill wall Stiffners ( 2nos ) ( inner ) BII-14 & BII-15 , at Zone 1D at Axis 01K &
Level and Location for Large Mosque WALL ( W 6 ) for, Zone 1G , Axis ( 3-3.2/B ) Level upto 873.30 &
Inspection and compaction test 3rd layer Backfilling Chid Care Building (as Highlighted) Zone 2N ( 3rd o
3rd coat of Cementitous water proof coating prior Stone Cladding for ZONE 2Q buttress, Infill wall & ri
3rd Coat Cementitous water proof coating prior Stone Cladding for ZONE 2R buttress, Infill wall & ring
Block Work Laying for ETFE pump room # 6050 from Lintel Beam to Bottom of Ring Beam at zone 2M axi
1st Layer of Block Work for Ground Floor at South small mosque Axis B-E/2 , 2-4/B, A-B/4 , B-D/7 , 7-8/D
Two Layers of 4mm thick Modified Bituminous WaterProofing Membrane for Retaining wall (wall and Fo
Surface Preparation and Primer Coating for Retaining wall (wall and Foundation from Axis 01S-01W , Zon
Steel Reinforcements for Infill wall (inner) ( Stage 2 ) at Zone 1D at Axis 01K-01J (as highlighted)
Concreting for Retaining wall from Axis 02C-02E Zone 6&7 , (As Highlighted)
Concreting for Infill wall ( inner ) ( Stage 2 ) at Zone 1D at Axis 01J-01K (as highlighted)
Shuttering for Infill wall Stiffners ( 2nos ) ( inner ) BII-14 & BII-15 , at Zone 1D at Axis 01K & 01L (as hi
Shuttering for Retaining wall from Axis 02C-02E Zone 6&7 , (As Highlighted)
Shuttering for Infill wall ( inner ) ( Stage 2 ) at Zone 1D at Axis 01J-01K (as highlighted)
Antitermite Under Mass Concrete (1st Layer ) under Rc Strip Footing ( inner ) at Zone 1K , Between Axi
Concreting Mass Concrete (1st Layer ) under Rc Strip Footing ( inner ) at Zone 1K , Between Axis 01AD-
Shuttering for Large Mosque WALL ( W 6 ) for, Zone 1G , Axis ( 3-3.2/B ) Level upto 873.30 & 874.50 (A
Concreting for Retaining wall from axis 01C-01E, zone 5&6 (as higlighted)
Concreting for Infill Perimeter wall at Zone 1L at Axis 01AG-01AH TOC 876.00 ( As Highlighted)
Concreting for South small mosque , Sloping Slab and Parapet, Axis D-F/1-2 , F-G/1 Zone 2B (as highlig
Inspection of Excavation for Car Park Tree Pit - 92No's (as Details D-38-1) as highlighted in the attached
Inspection of Excavation for Car Park Tree Pit - 49No's (as Details D-38-1) as highlighted in the attached
"Inspection for Installation of Heating and Chilled Water Line Pit for L/DC/17, L/DC/18, H/DC/38, L/
Inspection of Sand bedding under pipe for Fire & Security Distribution Line from L/FS/14 to L/FS/41 at Z
Inspection of Sand bedding under pipe for Telecommunication Line from L/TL/30 to L/TL/51 at Zone-L - a
Inspection of Sand bedding under pipe for LV Line from L/LV/11 to L/LV/31 at Zone-L - as highlighted (St
Inspection and Compaction test for backfilling Sub-grade 2nd Layer (2 of 4) above Sand Covering for RO
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 8) for LV Line Pit K/LV/05, K/L
"INSPECTION FOR INSTALLATION OF STORM WATER LINE GULLIES G-O-31, G-O-30, G-O-27, G-O-23, G-O-2
Inspection of Blinding Concrete under Beam of Seating Area 3-21 & 3-22 at Zone-G - As Highlighted
Inspection of Steel Reinforcement for Footing and Wall of Sub-station - R2, R15, R5 at Zone-B,F&G - as h
Inspection of Excavation for LV Line from B/LV/49 to F/LV/22 at Zone-B&F including Pit - B/LV/49, B/LV
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 4) above Sand covering for Hea
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 4) above Sand Covering for RO
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 5) for MV Line Pit C/MV/07
Inspection and Compaction test for backfilling Sub-grade 2nd Layer (2 of 6) around MV Line Pit - D
"Inspection and Compaction test for backfilling sub-grade 3rd Layer (3 of 8) for Heating and Chilled wa
"Inspection of Sand Covering Layer for Protection of MV Line from C/MV/09 to C/MV/11 and C/MV/37 t
Inspection and Compaction test for backfilling Sub-grade 4th Layer (4 of 8) for LV Line Pit K/LV/23, K/L
Inspection and Compaction test for backfilling Sub-base 1st Layer (1 of 1) under Boulder No. RB-259 (St
Notification to start backfilling for the existing trench from phase-2 at Zone - F - as highlighted in the
Inspection and Compaction test for backfillinh sub-grade 1st Layer (1 of 3) above Sand Covering for Non
Inspection and Compaction test for backfilling Sub-grade 3rd Layer (3 of 8) for LV Line Pit K/LV/23, K/L
"Inspection and Compaction test backfilling Sub-grade 7th Layer (7 of 7) around LV Line Pit G/LV/18, G
Inspection of Blinding Concrete under RO Water Line Pit POC-01 & POC02 at Zone-B - As highlighted
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 3) above Sand covering for He
Inspection and Compaction Test for backfilling Sub-Grade 10th Layer (10 of 12) for wing wall of SBC-03 -
"Inspection and Compaction test for backfilling sub-grade 2nd Layer (2 of 8) for Heating and Chilled wa
Inspection and Compaction Test for backfilling Sub-Grade 2nd Layer (2 of 3) above Storm Water Line Br
"Inspection of Excavation for Tree Pits inside the Seating Area 1- 11 at Zone-G (As Highlighted )"
Inspection for Installation of Stone Cladding without Copping for Seating Area 3 - 24 at Zone-K (As Highl
Inspection of Excavation for Non-Potable Water Line at Zone-C&D - as highlighted
Inspection of Sand bedding under pipe for Fire & Security Distribution Line from L/FS/22 to L/FS/06 at Z
Inspection of Sand bedding under pipe for Telecommunication Line from L/TL/40 to L/TL/21 at Zone-L -
Inspection of Sand bedding under pipe for LV Line from L/LV/08 to L/LV/07 at Zone-L - as highlighted (St
"Inspection for Installation of Slab for MV Line Pit - D/MV/17, D/MV/18, D/MV/33, D/MV/31, D/MV/03
Inspection and Compaction test for backfilling Sub-Grade 2nd Layer (2 of 2) for Car Park-J (CPJ2 ST. 0+
Inspection and Compaction test for backfilling Sub-Grade 1st Layer (1 of 2) for Car Park-J (CPJ2 ST. 0+
"Inspection and Compaction test for backfilling Sub-Grade 1st Layer (1 of 1) for Car Park-J (CPJ3 ST. 0
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 1) under Boulder No. RB-259 (S
Inspection and Compaction test for backfilling Sub-base 1st Layer (1 of 1) under Boulder No. RB-280 (St
Inspection and Compaction test for backfilling Sub-grade 2nd Layer (2 of 3) above Sand covering for He
Inspection and Compaction test for backfilling sub-grade 1st Layer (1 of 2) above Sand Covering for Non
"Inspection and Compaction test for backfilling sub-grade 1st Layer (1 of 8) for Heating and Chilled wat
"Inspection for application of Base Primer and Bituminous Damp Proofing (1st & 2nd Coat) for Canopy
Surface Preparation prior to start waterproofing for Canopy Foundation and Column Neck of Seating Ar
"Inspection for application of Base Primer and Bituminous Damp Proofing (1st & 2nd Coat) for Canopy
Gravel (Drainage) & Geo Textile (Filter membrane Terrain 1000) for Tree Pits (14 no's) Inside Water
Marking and Excavation for Tree Pits (14 no's) Inside Water play Garden and at Planted beds, insid
Gravel (Drainage) & Geo Textile (Filter membrane Terrain 1000) for Tree Pits (23 no's) Inside Water
Marking and Excavation for Tree Pits (23 no's) Inside Water play Garden, inside Water Garden, at h
Gravel (Drainage) & Geo Textile (Filter membrane Terrain 1000) for Tree Pits (29 no's) between Bou
Marking and Excavation for Tree Pits (29 no's) between Boundary wall and Mist & Geyser Garden, in
Gravel (Drainage) & Geo Textile (Filter membrane Terrain 1000) for Tree Pits (05 no's Remaining) b
Marking and Excavation for Tree Pits (05 no's Remaining) between Boulder lines at Geyser Garden,
Inspection of First Layer Block Layout at Ground Floor for all walls, Inside Site Tower 5, as per the hi
Concrete Pouring for Blinding under Wet Well Beside Water Feature, at Management and Mainten
Concrete Pouring & Shuttering for Footings of Seat walls (3 no's) Inside Outer canopy 2, at Physic Gar
Single Layer 4mm thk. Modified Bitumenous Water proofing Membrane for External Surfaces of Wet Well
Single Layer 4mm thk. Modified Bitumenous Water proofing Membrane for External Surfaces of Wet Well
Coordinates & Levels for Footing of Water feature Pump Room along Boundary wall, at Butterfly Garde
Sand Cover & Protection for Low Current Lines (MH/PG/LC/13-16) and Fire Alarm & Security lines (MH
Sand Cover & Protection for Electrical Lines of Emergency (MH/PG/EM/9-12) and Low Voltage (MH/PG/L
Inspection & Compaction tests of 2nd (Final) Layer Backfilling (Sub-Grade) under Fountain 2 (1 nos) (O
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 2 layers) under Fountain 2 (
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 2) above Sand covering for Hea
Installation of Rock and Boulder No. WRB-56 - 6th layer (6 of 6)
"Inspection for Casting the Blinding Concrete under the Manhole MH-O-07-1, MH-O-07-2, MH-O-07-3 an
Surface preparation prior to start backfilling for MV Line Pit - D/MV/10, D/MV/16, D/MV/35, D/MV/34
Inspection and Compaction test for backfilling Sub-grade 11th Layer (11 of 11) for wing wall of SBC-04 -
Inspection of Sand Covering to protect the pipe for Non-Potable Water Line at Zone-L - as highlighted (S
"Inspection and Compaction test backfilling Sub-grade 5th Layer (5 of 7) around LV Line Pit G/LV/18, G
Inspection of Sand bedding under pipe for Heating and Chilled Water Line at Zone-B - As highlighted (St
Inspection and Compaction test for backfilling Sub-grade 2nd Layer (2 of 8) for LV Line Pit K/LV/23, K/
Soil Preparation under Boulder No. RB-280
Soil Preparation under Boulder No. RB-259
Surface Preparation prior to start backfilling for Car Park-J (CPJ2 ST. 0+005 to 0+135, CPJ3 ST. 0+010
Inspection of Blinding Concrete under MV Line Pit - L/MV/18, L/MV/04 at Zone-L - as highlighted
Inspection of Sand bedding under pipe for Fire & Security Distribution Line from L/FS/06 to M/FS/07 At
Inspection of Sand bedding under pipe for Telecommunication Line from L/TL/21 to M/TL/08 at Zone-L&M
Inspection of Sand bedding under pipe for LV Line from L/LV/07 to M/LV/04 at Zone-L&M - as highlighte
Inspection for Laying of Red Tiles and Warning Tape above the pipe for LV Line from K/LV/22 to K/LV/16
Inspection of Sand covering for protection of pipe for Heating and Chilled Water Line at Zone-F - As high
Inspection of Excavation for Non-Potable Water Line at Zone-F&G - as highlighted
"INSPECTION FOR INSTALLATION OF ALL RINGS (RISER) AND SLAB FOR MH-Y-02 (As Highlighted) "
INSPECTION FOR MANHOLE BASE INSTALLATION AND UPVC PIPE CONNECTION FOR - MH-Y-02 (As Highli
Surface Preparation prior to start backfilling for Heating and Chilled water line Pit B/DC/02 and B/DC/0
Inspection of Blinding Concrete under Sub-station - R2 and R12 at Zone-B&F - as highlighted
"Inspection for Casting the Blinding Concrete under Beam of Seating Area 3-31, 3-32, 3-33, 3-34 at Zon
Excavation and Bed Preparation for Soakaway LG-SA1 & LG-SA2 drainage pipes UPVC 110 mm, Dia at Pli
Level and Location for MCPE 2 Wall and Counterfort of Zone 2J , Axis 02AB-02AC (As Highlighted ) Level
Level and Location for Infill wall ( Outer ) at Zone 2B , Axis 01AH - 01AI , Level From 872.50 to 873.00(
Level and Location for RC Foundation at North Administation Building ( P5 , P18 , P18 , W8 , W9 , W10
Level and Location for Columns of Energy Center at Grid 0-4 /A-C ( As Highlighted) Level upto 881.00
Level and Location for North Administration Building Columns ( C1, C1A ,C2 , C3 , C4 , C5 , C6 , C7 , C8 ,
Level and Location for perimeter wall upper part for TIP zone 2R Axis 02BC to tip, (as highlighted) TO
Level and Location for Energy Center Beam at Grid 0-14/I-L at level 878.50 (As Highlighted)
Level and Location for Cafeteria (undercroft) Wall (W5) , Zone 2A Axis 02A-02B , Level from 864.866-868
Concreting for RC Strip Footing ( Outer ) at Zone 1M From Axis 01AL to 01 AM (As Highlighted)
Shutttering for MCPE 2 Wall and Counterfort of Zone 2J , Axis 02AB-02AC (As Highlighted ) Level 875.85
Concreting for MCPE 2 Wall and Counterfort of Zone 2J , Axis 02AB-02AC (As Highlighted ) Level 875.85
Surface Preparation and Primer Coating For Retaining wall for Foundation and wall at Zone 2 from Axi
Inspection of Blinding Concrete under MV Line Pit - D/MV/35, D/MV/34, D/MV/09, D/MV/36, D/MV/1
Shuttering and Concreting for Columns of Energy Center at Grid 0-4 /A-C ( As Highlighted) Level upto 8
Shuttering for North Administration Building Columns ( C1, C1A ,C2 , C3 , C4 , C5 , C6 , C7 , C8 , C21 , C
Steel Reinforcement for Infill wall ( Outer ) at Zone 2B , Axis 01AH - 01AI , Level From 872.50 to 873.00
Shuttering for Infill wall ( Outer ) at Zone 2B , Axis 01AH - 01AI , Level From 872.50 to 873.00(As Highl
Concreting of Blinding under Beam at Energy center at Axis 17-21/N-Q (as highlighted)
Concreting for Blinding under S.O.G of ETFE pump Room # 6098 in Zone 2H , Axis 02AA (as highlighte
Concreting for Infill wall (Inner) of Zone 2A at Axis 02A-02B ( As Highlighted) Level from( 863.55 to 868.6
Shuttering for Infill wall (Inner) of Zone 2A at Axis 02A-02B ( As Highlighted) Level from( 863.55 to 868.6
Two coats of Bituminous Damp Proof Coating for Internal Building wall ( W20 & W21 ) at Zone 1N &1P A
Surface Preparation and primer coating for diaphragm wall Under Foundation at zone 2C axis 02J (As Hi
Protection Layer of 4mm thick Bituminous Protection Board for diaphragm wall Under Foundation at Zon
Single Layer of 4mm thick Modified Bituminous WaterProofing Membrane for diaphragm wall Under Foun
Two Layers of 4mm thick Modified Bituminous WaterProofing Membrane for Central Bridge Abutment Wal
Protection Layer of 4mm thick Bituminous Protection Board for Central Bridge Abutment Wall ( Outer Si
Steel Reinforcement for Diaphragm wall for ( Kicker , Wall and Stiffner) for ( 2nd Span ) at Zone 1E , Axi
Steel Reinforcement for Infill wall (outer) at Zone 1F , Axis 01Q-01R (as highlighted)
Concreting for Infill wall ( outer ) , Zone 2A ,between Axis 02A-02B Level From 863.55 to 869.135 (as hig
Concreting for Cafeteria (undercroft) Wall (W5 ) , Zone 2A Axis 02A-02B , Level from 864.866-868.75 (As
Excavation and Bed Preparation for Soakaway pipes sleeves drainage pipes UPVC 160 mm, Dia at Garde
Steel Reinforcement for Diaphragm wall , Kicker and Wall ( Inclined wall ) at Zone 1E , Axis 01P (As Hi
Installation of PVC Conduit (Dia. 25mm) and Boxes for Voice & Data (DATA & Telephone) at Ground Fl
Installation of PVC Conduit (Dia.25mm) & Boxes for Fire Alarm (Speaker) at Ground Large Mosque (be
Surface Preparation prior to start Blinding Concrete under Beam of Seating Area 3-31, 3-32, 3-33, 3-34
Pre insulated Heat water Pipes 150mmØ ( laying ,Aligment ,Leveling and fit up) From point (E:64762
Warning Tape Installation in pipes(600&450&400mm Ø- UPVC Pipes-Class 4 ) for Storm Water pipe
2nd coat of Cementitous water proof coating prior Stone Cladding for ZONE 2Q buttress, Infill wall & rin
Cementitous water proof coating prior Stone Cladding for ZONE 2Q buttress, Infill wall & ring beams ,( I
Inspection and compaction test for 3rd and 4th layer of Subgrade Backfilling for Diaphragm wall Foundat
Gravel 3/8" Backfilling and Geotextile in pipes (600&450&400mm Ø- UPVC Pipes-Class 4 ) for Sto
Inspection and compaction test for 1st Layer of Subgrade backfilling for Strip footing ( Outer ) , Zone 1M
Inspection and Compaction test for 5th layer of backfilling for MCPE 1 duct tunnel wall and Buttress (
Inspection and Compaction test of 1st Layer of Subgrade backfilling for around Isolated footing of Cano
Excavation for Garden of Choices , Zone 1M-1L ( As Highlighted )
Level and Location for Devonian Garden for SOG and Concrete Pad at Zone 2M ,Axis 02 AL -02 AM (as hi
Level and Location for Infill wall (Outer ) at Zone 1D, Between Axis 01K-01L , Level upto 876.00 (As Highl
Level and Location for Infill wall ( 1st Stage ), at Zone 1L ,between Axis 01AG -01AH ,TOC : 874.50 (as hi
Level and Location for Mass Concrete ( 1st Layer ) under Rc Strip Footing ( inner ) at Zone 1K , Betwe
Level and Location for RC Strip footing ,at North Administation Building ,Zone 2Q , Between Axis 02AX
Shuttering for Infill wall (Outer ) at Zone 1D, Between Axis 01K-01L (As Highlighted)
Concreting for Infill wall (Outer ) at Zone 1D, Between Axis 01K-01L , Level 876.00 (As Highlighted)
Steel Reinforcement for Infill wall Between Buttress BOV,BOI - 66 at Zone 2B, Axis 02/2 , Level 873.21
Steel Reinforcement for Infill wall ( 1st Stage ) ( Vertical ) ( Outer ) at Zone 1L , Axis 01AH - 01AI , Level
Shuttering for Infill wall ( 1st Stage ), at Zone 1L ,between Axis 01AG -01AH ,TOC : 874.50 (as highlighte
Steel Reinforcement for Devonian Garden for SOG and Concrete Pad at Zone 2M ,Axis 02 AL -02 AM (as h
Steel reinforcement for North Administation Building Coluimns ( C20_C29_C30_C31_C32_C33_C34_C35 )
Steel Reinforcement for Retaining wall from Axis 02C-02E Zone 6&7 , (As Highlighted)
Shuttering for Mass Concrete ( 1st Layer ) under Rc Strip Footing ( inner ) at Zone 1K , Between Axis 0
Surface Preparation and Primer Coating for Devonian Garden for top of the Foundation and Wall at Z
Protection Layer of 4mm thick Bituminous Protection Board for Devonian Garden for top of the Founda
Single Layer of 4mm thick Modified Bituminous WaterProofing Membrane for Devonian Garden for top
Steel reinforcement for RC Strip footing ,at North Administation Building ,Zone 2Q , Between Axis 02
Shuttering for RC Strip footing ,at North Administation Building ,Zone 2Q , Between Axis 02AX-02AY (
Concreting for RC Strip footing ,at North Administation Building ,Zone 2Q , Between Axis 02AX-02AY (
Solvent Base Primer Coating prior to Membrane Water proofing for External Surfaces of Wet Well E (Al
Solvent Base Primer Coating prior to Membrane Water proofing for External Surfaces of Wet Well F (Al
Installation of straight UPVC Conduit (Dia. 160mm) Medium Voltage Ductbank (C/MV/11 to C/MV/10
Installation of straight UPVC Conduit (Dia. 160mm) Medium Voltage Ductbank no. CC/D-MV/21 (C/M
Installation of straight UPVC Conduit (Dia. 160mm) Low Voltage Ductbank no. EE/D-LV/01 (E/LV/02 t
Installation of straight PVC Conduit (Dia. 25mm) & Boxes for Lighting System (Presence Detector) at F
Excavation for Fire & Security Distribution Line from L/FS/22 to L/FS/06 and L/FS/14 to L/FS/41 At Zone-L
Installation of straight UPVC Conduit (Dia. 110mm) for Low Voltage System (Power, Emergency) at Gr
Excavation for Telecommunication Line from L/TL/40 to L/TL/21 and L/TL/30 to L/TL/51 at Zone-L Includi
Inspection of Excavation for LV Line from L/LV/08 to L/LV/07 and L/LV/11 to L/LV/31 at Zone-L including
Inspection of Sand Covering to protect the pipe for RO Water Line at Zone-B - as highlighted in the att
Installation of straight PVC Conduit (Dia. 25mm) & Boxes for Lighting System (LED N, W1, W1/E) at Gr
Inspection of Concrete (Plain) Pouring for Duct Bank of Fire & Security line between F/FS/04 and F/FS/0
Inspection of Concrete (Plain) Pouring for Duct Bank of Telecommunications line between F/TL/04 and F
Inspection of Concrete (Plain) Pouring for the Duct Bank of MV Line between F/MV/11 and F/MV/06 at
'Warning Tape For Non-Potable Water (Irrigation Main Line); (40 mmØ- UPVC-Claas-5 ) ; As per High
Inspection of Blinding Concrete under LV Line Pit - F/LV/01, F/LV/12, F/LV/18, F/LV/14, F/LV/05, G/LV/
Inspection of Excavation for LV Line at Zone-F&G including Pit - F/LV/01, F/LV/12, F/LV/18, F/LV/14, F/
Excavation for Fire Water Line at Zone-2 including Pit C/F/08, C/F/09, C/F/07, C/F/06 - as highlighted
Excavation for Potable Water Line at Zone-2 including Pit C/PW/09, C/PW/03 - as highlighted
Excavation for Storm Water Line from MH-G-12 to MH-G-10 including branch, Manhole MH-G-11 and Gull
Inspection of Excavation for Non-Potable Water Line at Zone-C&D including branch and Pit POC-23 - as h
Inspection of Sand covering for protection of pipe for Heating and Chilled Water Line at Zone-G - As hig
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 6) around MV Line Pit - D/
Installation of PVC Conduit (Dia.25mm) & Boxes for Voice and Data (WIFI) at the Manangement Bulidi
Inspection and Compaction Test for backfilling Sub-Grade 9th Layer (9 of 10) for wing wall of SBC-03 - A
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 2) above Sand covering for He
"Inspection and Compaction test backfilling Sub-grade 6th Layer (6 of 7) around LV Line Pit G/LV/18, G
Installation of straight UPVC Conduit (Dia. 75mm) Low Current (Fire Alarm & Security) at Ground Flo
Installation of straight PVC Conduit (Dia. 25mm) and Boxes for Voice and Data (CAM) at Site Tower N
"Surface Preparation prior to start backfilling for MV Line Pit C/MV/07, C/MV/08, C/MV/09, C/MV/27
Installation of straight PVC Conduit (Dia. 25mm) and Boxes for Security (CAM) at Ground Floor Site
Surface Preparation prior to start Water Proofing and Waterproofing for MV Line Pit C/MV/07, C/M
Installation of straight PVC Conduit (Dia. 25mm) and Boxes for Fire Alarm (Smoke Detector) at Groun
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 3) above Sand covering for He
Surface Preparation prior to start backfilling for Canopy Foundation and Column Neck of Seating Area 1
Concrete Pouring & Shuttering for Foundation and Pad (with wall Starter) of Mechanical Manhole, at
Steel Reinforcement for Foundation and Pad of Mechanical Manhole, at Grid (F-H/10-11), at Manage
Gravel (Drainage) & Geo Textile (Filter membrane Terrain 1000) for Tree Pits (55 no's) At Right sid
Inspection of Excavation for Heating & Chilled Water Line at Zone-L including branch - as highlighted
Marking and Excavation for Tree Pits (55 no's) At Right side of Geyser Garden, inside Water Garden
Inspection and Compaction Test for backfilling Sub-Grade 1st Layer (1 of 3) above Storm Water Line Br
Inspection of Casting Concrete Encasement for Storm Water Line Branch from MH-Y-01 to End of Line a
Inspection of Backfilling Soil Mix (70%Sand, 10%Sweet Soil, 10% Organic material, 10% Perlite) for Tree
Coordinates & Levels for Foundation and Pad of Mechanical Manhole, at Grid (F-H/10-11), at Manag
Inspection of Backfilling Gravel 1st Layer (1 of 1) and Geotextile for Tree Pits inside the Seating Area 1
Coordinates & Levels of Blinding under Wet Well Beside Water Feature, at Management and Maint
Concrete Pouring and Shuttering for Foundation & Kicker of Decant Sump-D3 at Mist Garden, inside
Excavation for Wet Well Beside Water Feature, at Management and Maintenance Building, As Hig
Excavation for Diaphragm Wall at ZONE 2M Grid 02/AL ( As Highlighted )
Inspection of 3rd Layer Gravel Backfilling (50cm ht) for Sub Surface Drainage Pipes (for Trees), Betwe
Inspection & Compaction tests of Single Layer (Sub-Base) Backfilling above Warning Tiles & Tape fo
1st Layer of Solid Block Work for First Floor at South small mosque Axis D-E/7-8 at Zone 2B (As Highligh
Inspection & Compaction tests of Single Layer (Sub-Base) Backfilling above Warning Tiles & Tape for
Block Work from 1st Layer to Lintel Beam for First Floor at South Small Mosque, Axis D-E/7-8 at Zone 2
Block Work from Lintel Beam to Slab for First Floor at South Small Mosque Axis D-E/7-8 at Zone 2B (As
Steel Reinforcement and Shuttering for Stiffner and Lintel Beam for First Floor at South Small Mosque
Surface Preparation prior to Water Proofing for Wall & Foundation (Inner & Outer) Surfaces of Decan
Level and Location for MCPE 2 Roof Slab at Zone 2J , Between Axis 02 AD-02AE (as highlighted)
Level and Location for Blinding Under Diaphragm Wall Foundation at Zone 2M ,Grid 02/AL (as highlighte
Level and Location for Infill wall for Butress ( BOV-BOI 63 ( Outer ) ) , ( BIV-BII 63 ( Inner ) ) for Zon
Level and Location for Infill wall ( outer ) , Zone 2A ,between Axis A-B Level From 863.55 to 869.135 (as
Level and Location for Diaphragm wall for Kicker and Wall ( Inclined Wall ) at Zone 1E , Axis 01M (As Hi
Level and Location for Infill wall ( Upper Part ) at Zone 1A , Axis 01A to 01B , Level 877.50 (As Highlight
Steel Reinorcement for Large Mosque Lower Second Floor Walls ( W1 & W3 ) for, Zone 1G , Axis ( 1-2 / D
Two coats of Bituminous DampProofing for Front Canopy Foundation at Zone 4 5 & 6 , Axis 01C-01J , le
Shuttering for MCPE 2 Roof Slab at Zone 2J , Between Axis 02AD to 02AE (as highlighted)
Concreting for MCPE 2 Roof Slab at Zone 2J , Between Axis 02AD-02AE (as highlighted)
' Soak away Pipe Installation of Drain pipes including sleeves under strip footing (160&110mmØ - U
Protection Layer of 4mm thick Bituminous Protection Board for Front Canopy Foundation at Zone 4 5 & 6
Shuttering for Blinding Under Diaphragm Wall Foundation at Zone 2M ,Grid 02/AL (as highlighted)
Steel reinforcements for MCPE 2 Roof Slab at Zone 2J , Between Axis 02AD to 02AE (as highlighted)
Concreting for RC Foundation at North Administation Building ( P5 , P18 , P18 , W8 , W9 , W10 , W11 ) a
Steel reinforcement for Child Care Columns and Walls Upto Bottom of Suspended Slab , Columns ( C2 ( 8no
'Bedding of Gravel 3/8" and Geotextile Surrounding Soak away Pipe Installation of Drain pipes incl
Steel reinforcemnet for Diaphragm wall at Zone 1M 1N , Axis 01AM , level from 874.5 to 877.5 (As Hig
Shuttering for Infill wall ( outer ) , Zone 2A ,between Axis 02A-02B Level From 863.55 to 869.135 (as hig
Shuttering for Diaphragm wall for Wall ( Inclined Wall ) at Zone 1E , Axis 01M , Level 869.00 (As Highlig
Concreting for Diaphragm wall for Kicker and Wall ( Inclined Wall ) at Zone 1E , Axis 01M Level 869.00
Steel reinforcement for RC Foundation at North Administation Building ( P5 , P18 , P18 , W8 , W9 , W10
Shuttering for RC Foundation at North Administation Building ( P5 , P18 , P18 , W8 , W9 , W10 , W11 ) a
Steel Reinforcement for Infill wall TIP ( Upper Part ) at Zone 1A , Axis 01A to TIP , Level 874.26 (As High
Steel Reinforcement for Infill wall ( Upper Part ) at Zone 1A , Axis 01A to 01B , Level 877.50 (As Highlig
Shuttering for Infill wall ( Upper Part ) at Zone 1A , Axis 01A to 01B , Level 877.50 (As Highlighted)
Installation of direct buried UPVC conduit 32mm (stub-up & straight) for Lighting at the Discovery Gard
Installation of direct buried UPVC conduit (dia.75mm) Low Voltage Ductbank (Normal Power) in be
Installation of direct buried UPVC conduit (dia.75mm) Low Voltage Ductbank (Emergency) in bet
Installation of PVC conduit (Dia. 25mm) & Boxes for Fire Alarm (Transmitter, Beam Detector, Receiver
Installation of UPVC Conduit (2x110mm) Low Current Ductbank (TELECOM) in between Manhole ( D/T
Installation of UPVC Conduit (2x110mm) Low Current Ductbank (Fire & Security) in between Manhole
Inspection for Installation of Stone Cladding without Copping for Seating Area 3 - 34 at Zone-K (As Highl
Installation of Rock and Boulder No. WRB-56 - 5th layer (5 of 6)
Inspection of Blinding Concrete under LV Line Pit - B/LV/28 at Zone-B - as highlighted
Excavation for Storm Water Line from MH-O-07 to G-O-02 including branch, Manhole MH-O-07-1, MH-O-0
Inspection of Sand covering for protection of pipe for Heating and Chilled Water Line at Zone-B - As high
Inspection and Compaction Test for backfilling Sub-Grade 8th Layer (8 of 10) for wing wall of SBC-03 - A
Inspection and compaction test for backfilling Sub-grade 5th Layer (5 of 6) around MV Line Pit D/MV/04
Inspection and Compaction test for backfilling Sub-grade 10th Layer (10 of 11) for wing wall of SBC-04 -
"Inspection and Compaction test backfilling Sub-grade 4th Layer (4 of 7) around LV Line Pit G/LV/18, G
Inspection for Installation of Pit and Slab for MV Line Pit - C/MV/43 at Zone-C - As Highlighted (SCR:
Inspection and Compaction Test for backfilling Sub-Grade 7th Layer (7 of 10) for wing wall of SBC-03 - A
Inspection and compaction test for backfilling Sub-grade 4th Layer (4 of 4) around MV Line Pit D/MV/04
Inspection and Compaction test for backfilling Sub-grade 9th Layer (9 of 10) for wing wall of SBC-04 - As
Pipe Installation of Trees Sub-Surface Drainage (Main Line & Branches) Pipes; ( Perforated110 mmØ
Pipe Installation of Sub-Surface Drainage (Main Line & Branches) Perforated Pipes; (110 mmØ, UPVC
Excavation for MV Line from L/MV/15 TO L/MV/03 at Zone-L including Pit L/MV/04, L/MV/18 - as highli
Inspection of Backfilling Soil Mix (70%Sand, 10%Sweet Soil, 10% Organic material, 10% Perlite) for Tree
Inspection of Backfilling Gravel 1st Layer (1 of 1) and Geotextile for Tree Pits inside the Seating Area 1
Gravel (Drainage) & Geo Textile (Filter membrane Terrain 1000) for Plantation area (Remaining) insdie
Inspection and Compaction test for 4th layer of backfilling for MCPE 1 duct tunnel wall and Buttress (o
Surface preparation Prior to start backfilling for Strip footing ( Outer ) , Zone 1M Axis Between 03T-03U
Excavation & Surface Preparation for Plantation area (Remaining) insdie Tunnel, at Butterfly Garden,
Gravel (Drainage) & Geo Textile (Filter membrane Terrain 1000) for Tree Pits (07 no's) inside Tunnel,
Inspection and Compaction test of 7th and 8th Layer of SubGrade backfilling for Retaining wall at Zone 2
Marking and Excavation for Tree Pits (07 no's) inside Tunnel, at Butterfly Garden, as highlighted area
Inspection and Compaction test of 1st Layer of Gravel backfilling for Canopy Foundation , Axis 01/Z-01/
Coordinates & Levels for Foundation of Decant Sump-D3 at Mist Garden, inside Water Garden as hig
Surface preparation Prior to start backfilling for South Administration Building , Zone 2C , Axis 02H-02J
Surface Preparation prior to Backfilling Between 3rd & 4th line of boulders at Right side of Geyser, (
Inspection & Compaction Tests for 2nd Layer (Sub Grade) Backfilling (Out of 3 layers) Inside Outer Ca
Inspection of 2nd Layer Gravel Backfilling (50cm ht) for Sub Surface Drainage Pipes (for Trees), At 6
inspection and compaction test 3rd layer of backfilling in energy center, axis 19-28/N-Q (as highlighte
Surface Preparation Prior to Backfilling under Fountain 2 (1 nos), (Outer) Right side, Inside Physic Ga
Steel Reinforcement for Wall of Decant Sump-D1 at Boat garden, Inside Water Garden as highlighte
Steel Reinforcement for Foundation & Kicker of Decant Sump-D3 at Mist Garden, inside Water Garde
Inspection and Compaction test for 5th Layer of Backfilllng between duct tunnel Shaft of MCPE 1 and B
Inspection and compaction test for 1st and 2nd layer of Subgrade Backfilling for Diaphragm wall Founda
Inspection and Compaction test for 2nd layer Backfilling around Foundation to create slope Formation
Inspection and Compaction test for 1st layer Backfilling around Foundation to create slope Formation
Level and Location for Stiffner of Diaphragm wall for ( 1st Span ) at Zone 1E , Axis 01P , level upto 868.4
Block Works Laying for Large Mosque,Ground Floor Axis 1-2/C-F at Zone 1G Upto Bottom of Lintel Be
Level and Location for Infill Perimeter wall at Zone 1L at Axis 01AG-01AH TOC 876.00 ( As Highlighted)
Level and Location for Blinding under Foundation at Energy center at Axis 12-13/A , Level 871.10 ( As H
Level and Location for Blinding under Beam at Energy center at Axis 17-21/N-Q , Level 870.80 (as highli
Level and Location for Retaining wall from Axis 01C-01E, Zone 4&5 (As Highlighted)
Grouting of Installed Anchor bolt and under Baseplate at Zone 1L INNER & OUTER ring beam (as highl
Grouting of Installed Anchor bolt and under Baseplate at Zone 2G INNER ring beam (as highlighted)
Grouting of Installed Anchor bolt and under Baseplate at Zone 1J INNER & OUTER ring beam (as highl
Concreting for Stiffner of Diaphragm wall for ( 1st Span ) at Zone 1E , Axis 01P (As Highlighted)
Shuttering for Child Care Grade Beam at Zone 2N (As Highlighted)
Concreting for Child Care Grade Beam at Zone 2N (As Highlighted)
Concreting for Diaphragm wall Beam at Zone 1E Axis 01P (as highlighted)
Steel Reinforcement for Columns of Energy Center at Grid 0-4 /A-C ( As Highlighted) Level upto 881.00
Antetermite under Blinding under Foundation at Energy center at Axis 12-13/A (as highlighted)
Shuttering and Concreting for Blinding under Foundation at Energy center at Axis 12-13/A , Level 871.1
Antetermite under Blinding under Beam at Energy center at Axis 17-21/N-Q (as highlighted)
Shuttering for Retaining wall from Axis 01C-01E, Zone 4&5 (As Highlighted)
Surface Preparation and Primer coating for Infill wall ( inner ) at Zone 1F ,between Axis 01P -01Q ,Level
Single Layer of 4mm thick Modified Bituminous WaterProofing Membrane for Infill wall ( inner ) at Zo
Protection Layer of 4mm thick Biuminous Protection Board for Infill wall ( inner ) at Zone 1F ,between
Shuttering for Infill Perimeter wall at Zone 1L at Axis 01AG-01AH TOC 876.00 ( As Highlighted)
Shuttering for Diaphragm wall , Kicker and Wall ( Inclined wall ) at Zone 1E , Axis 01P (As Highlighted)
Concreting for Diaphragm wall , Kicker and Wall ( Inclined wall ) at Zone 1E , Axis 01P (As Highlighted)
Steel Reinorcement for Large Mosque WALL ( W 6 ) for, Zone 1G , Axis ( 3-3.2/B ) Level upto 873.30 &
Grouting of Installed Anchor bolt and under Baseplate at Zone 2F INNER ring beam (as highlighted
Grouting of Installed Anchor bolt and under Baseplate at Zone 2F INNER ring beam (as highlighted
Level and Location for Large Mosque Lower Second Floor Beam ( 137A ) for, Zone 1G , Axis ( 2-5 / E ) Le
Level and location for MCPE 2 Roof Slab at Zone 2J Between axis 02AD to 03K , TOC : 875.850 & 875.974
Level and Location for Child Care Walls ( W2 ( 2nos) ) ( W3 ) & ( W7 ) at Zone 2N , Level upto 875.225 (A
Level and location for Stiffner of Buttress BOV-BOI- 9 & BOV-BOI-10 ( Outer ( 2 no ) ) , at Zone 1C Axis
Shuttering for Stiffner of Diaphragm wall for ( 1st Span ) at Zone 1E , Axis 01P (As Highlighted)
Mechanical Pipe sleeve Installation , Second floor At Crescent 2 (South Mosque) ; ( dia160mm UPVC
Pre insulated Chilled Water Pipes (R) 250mmØ ( laying ,Aligment ,Leveling and fit up) (E:648063.94
Pre insulated Heat Pipes(S&R) 200mmØ ( laying ,Aligment ,Leveling and fit up) From point (E:647
'Pipe Installation (600&450&400mm Ø- UPVC Pipes-Class 4) for Storm Water pipe Out Fall-G inclu
Bedding of Gravel 3/8" and Geotextile surrounding in pipes (600&450&400mm Ø- UPVC Pipes-Class
' Warning Tape Installation in pipes(450&400&315mm Ø- UPVC Pipes-Class 4 ) for Storm Water pipe
Warning Tape Installation in pipes (315&160mm Ø- UPVC Pipes-Class 4 ) for Storm Water pipe Out Fa
Warning Tape Installation in pipes (315&200mm Ø- UPVC Pipes-Class 4 ) for Storm Water pipe Out Fall
Gravel 3/8" Backfilling and Geotextile in pipes (450&400&315mm Ø- UPVC Pipes-Class 4 ) for Stor
' Gravel 3/8" Backfilling and Geotextile in pipes (315&160mm Ø- UPVC Pipes-Class 4 ) for Storm Water
' Gravel 3/8" Backfilling and Geotextile in pipes (315&200mm Ø- UPVC Pipes-Class 4 ) for Storm Water
Level and Location for South Small Mosque Staircase ( Step , Riser , Landing ) from ground to 1st Flo
Excavation for Low Current Lines of (TG/T/LC-01 to trench at grid 21) and Fire Alarm & Security (TG/F&
Excavation for Electrical Lines of Emergency (TG/E/LV-01 to trench at grid 21) and Low Voltage (TG/N/L
Inspection of Gravel Backfilling (50cm ht) for Sub Surface Drainage Pipes (for Trees), At 4 places ins
Coordinates & Levels for Footings of Seat walls (3 no's) Inside Outer canopy 2, at Physic Garden, as h
Steel Reinforcement for Footings & Walls of Seat walls (3 no's) Inside Outer canopy 2, at Physic Garde
Grouting of Installed Anchor bolt and under Baseplate at Zone 2G OUTER ring beam (as highlighted
Grouting of Installed Anchor bolt and under Baseplate at Zone 2G OUTER ring beam (as highlighted
"Inspection for Installation of Slab for MV Line Pulling Pit - B/MV21, H/MV/01, K/MV/01, L/MV/06, L
Steel reinforcements for MCPE 2 Roof Slab at Zone 2J Between axis 02AD to 03K (as highlighted)
Shuttering for Large Mosque Lower Second Floor Beam ( 137A ) for, Zone 1G , Axis ( 2-5 / E ) Level upto
Concreting for Large Mosque Lower Second Floor Beam ( 137A ) for, Zone 1G , Axis ( 2-5 / E ) Level upto
Steel reinforcements for North Administration Building Columns ( C1, C1A ,C2 , C3 , C4 , C5 , C6 , C7 , C8
Shuttering for MCPE 2 Roof Slab at Zone 2J Between axis 02AD to 03K (as highlighted)
Concreting for MCPE 2 Roof Slab at Zone 2J Between axis 02AD to 03K (as highlighted)
Concreting for Stiffner of Buttress BOV-BOI- 9 & BOV-BOI-10 ( Outer ( 2 no ) ) , at Zone 1C Axis 01G & 0
Protection Layer of 4mm thick Bituminous Protection Board For Rc Strip Footing ( Outer ) at Zone1M ,
Surface Preparation and Primer Coating for Central Bridge Abutment Rc Footing , Axis 02AL-02AK, Zone
Two Layers of 4mm thick Modified Bituminous WaterProofing Membrane for Central Bridge Abutment Rc
Protection Layer of 4mm thick Bituminous Protection Board for Central Bridge Abutment Rc Footing , Ax
Surface Preparation and Primer Coating above Blinding under RC Strip Footing at Zone 1K , Axis 01AD-AE
Single Layer of 4mm thick Modified Bituminous WaterProofing Membrane above Blinding under RC Strip
Protection Layer of Geotextile and screed above Blinding under RC Strip Footing at Zone 1K , Axis 01AD
Steel Reinorcement for Large Mosque Lower Second Floor Beam ( 137A ) for, Zone 1G , Axis ( 2-5 / E ) L
Shuttering for Stiffner of Buttress BOV-BOI- 9 & BOV-BOI-10 ( Outer ( 2 no ) ) , at Zone 1C Axis 01G & 0
Steel reinforcemaens for infill wall (outer), zone 1D, between axis 01K-01L (as highlighted)
Mechanical Pipe sleeve Installation ,Infill wall outer (CHW S&R) Between Axis (01/2,01/AG to 01/AH
Installation of UPVC conduit (3X10mm) Low Current Ductbank (TELECOM) at the Crescent - 2 Reception
Installation of UPVC conduit (3X10mm) Low Current Ductbank (Fire & Security) at the Crescent - 2 Rece
Installation of UPVC conduit (dia. 75mm) Low Current Ductbank (Fire & Security) in between Manhole
Installation of UPVC conduit (dia. 75mm) Low Current Ductbank (TELECOM) in between Manholes (MH/
Installation of PVC conduit (Dia. 25mm) & Boxes for Fire Alarm (Transmitter, Beam Detector, Receiver
Installation of PVC Conduit (Dia. 25mm) and boxes for Lighting System (LED N/CE, Lighing Switch) at t
Installation of PVC Conduit (Dia. 25mm) and boxes for Lighting System (LED C, C/CE, Presence Detecto
Concreting for Large Mosque Lower Second Floor Slab for , Zone 1G , Axis ( 1-2 / D-F ) (As Highlighted)
Concreting for infill wall (inner) (stage 2) at zone 1D at axis 01L-01M (as highlighted)
Concreting for Kicker of Retaining wall from Axis 02C-02E Zone 6&7 , (As Highlighted)
Concreting for Diaphragm wall Kicker ( 3rd Span ) at Zone 1E , Axis 01P (As Highlighted)
Concreting for Diaphragm wall for Kicker at Zone 1E , Axis 01M (As Highlighted)
Shuttering for mass Concrete under Strip footing at Zone 1K ( Outer ) Axis 01AD-01AE-01AF , TOC : 866
Level and Location for Foundation of Retaining wall from Axis 01W-01Z Zone 2 , (As Highlighted)
Inspection and Compaction test of 2nd Layer of Backfilling in Energy Center, Axis 19-28/N-Q (As Highligh
Inspection and Compaction test for 4th Layer of Backfilllng between duct tunnel Shaft of MCPE 1 and B
Inspection and Compaction test for 3rd layer of backfilling for MCPE 1 duct tunnel wall and Buttress (o
Inspection and Compaction test for 3rd and 4th Layer of Backfilllng at diaphragm wall at Zone 2N , Axis
Inspection and Compaction test for 3rd and 4th Layer of Gravel backfilling BetweenTUNNEL 1 Wall and
Surface preparation Prior to start backfilling for Canopy Foundation , Axis 01/Z-01/AO Plant Area 2,3 ,
Inspection of Sand bedding under pipe for MV Line form B/MV05 to B/MV/14 at Zone-B - as highlighted
Steel Reinforcement for Foundation of Retaining wall from Axis 01W-01Z Zone 2 , (As Highlighted)
Shuttering for Foundation of Retaining wall from Axis 01W-01Z Zone 2 , (As Highlighted)
Concreting for Foundation of Retaining wall from Axis 01W-01Z Zone 2 , (As Highlighted)
Steel Reinforcement for Kicker of Retaining wall from Axis 02C-02E Zone 6&7 , (As Highlighted)
Steel Reinforcement for Diaphragm wall for ( Kicker , Wall and Stiffner) for ( 2nd Span ) at Zone 1E , Axi
Steel Reinforcement for Stiffner of Diaphragm wall for ( 1st Span ) at Zone 1E , Axis 01P (As Highlighted)
Steel Reinforcement for Child Care Columns ( C1 ) ( 2 nos ) at Zone 2N (As Highlighted)
Shuttering for Diaphragm wall Kicker ( 3rd Span ) at Zone 1E , Axis 01P (As Highlighted)
Shuttering for Diaphragm wall for Kicker at Zone 1E , Axis 01M (As Highlighted)
Protection Layer of 4mm thick Bituminous Protection Board for diaphragm wall( Vertical only) at Zone 4
Surface Preparation and Primer Coating for Above Blinding Under Retaining wall Foundation from Axis
Two Layers of 4mm thick Modified Bituminous Water Proofing Membrane for Above Blinding Under Ret
Cementitious WaterProofing for Above Blinding Under Retaining wall Foundation from Axis 01Z-01AB ,
Protection Layer of 4mm thick Bituminous Protection Board for Above Blinding Under Retaining wall Fo
'Bedding of Gravel 3/8" and Geotextile Surrounding Pipe Installation of Trees Sub-Surface Drainage
Stone Cladding for Wall & Column's of Boundary wall (Inner & Outer Sides) (and Remaining Parts on
Rough Coat (Spatter Dash) Prior to Plastering of Parapet wall (from Internal & Top Sides) at Grid (A
Plaster Guide Points & Accessories for Plastering of Parapet wall (from Internal & Top Sides) at Gri
Plastering of Parapet wall (from Internal & Top Side) at Grid (3/A-E & A/3-6), on Management and Ma
Inspection for Installed Low Current Handholes (MH/PG/LC/21) and Fire Alarm & Security (MH/PG/FA/1
Inspection for Installed Electrical Handholes of Emergency (MH/PG/EM/16) and Low Voltage (MH/PG/L
Inspection & Compaction tests of Single (Final) Layer (Sub-Base) Backfilling (after Sub Grade layer) B
Warning Tiles & Tape above Sand Cover for Low Current Lines (MH/WG/LC/11 to 12), Fire Alarm & Sec
Warning Tiles & Tape above Sand Cover for Electrical Lines of Emergency (MH/WG/EM/17 to 18), Insid
Inspection of 4th layer Gravel Backfilling (50cm ht) surround the Foundation & Wall of Wet Well E, In
Inspection of 2nd layer Gravel Backfilling (50cm ht) surround the Foundation & Wall of Wet Well F, I
Steel Reinforcement for Footing & Kicker of Water feature Pump Room along Boundary wall, at Butterf
Sand Cover & Protection for Low Current Lines (MH/WG/LC/11 to 12), Fire Alarm & Security (MH/WG/FA
Sand Cover & Protection for Electrical Lines of Emergency (MH/WG/EM/17 to 18), Inside Geyser Garden
Concrete Pouring and Shuttering for Wall of Decant Sump-D4 Inside Water Play garden, at Water Gard
Inspection of 1st layer Gravel Backfilling (50cm ht) surround the Foundation & Wall of Wet Well F, In
Inspection of 3rd layer Gravel Backfilling (50cm ht) surround the Foundation & Wall of Wet Well E, In
Weld Visual & NDT Inspection for the Lightening Support in Crescent 01 G-L 01I, 01Q, 01Y, 01AE, 01A
1st Layer of Solid Block Work for First Floor at South small mosque Axis B-D/2&7 , E-G/8 at Zone 2B (As
Block Work from 1st Layer to Lintel Beam for First Floor at South small mosque Axis B-D/2&7 , E-G/8 at
Inspection and Compaction test of 1st Layer of Backfilling in Energy Center, Axis 19-28/N-Q (As Highlight
Installation of Soak away ( SA-1 ) Base in North Administration Building , at Zone 2Q ( As Highlighted )
Installation of Soak away ( SA-2 ) Base in North Administration Building , at Zone 2Q ( As Highlighted )
Excavation and Bed Preparation at ZONE 2J-2K ( As Highlighted )
Shuttering for Infill wall ( inner ) ( Stage 1 ) at Zone 1D at Axis 01L-01M (as highlighted)
Steel Reinforcement for Retaining wall from Axis 01C-01E, Zone 4&5 (As Highlighted)
Shuttering for Infill wall ( outer ) , Zone 1A between axis 01C-01D (as highlighted)
Concreting for Infill wall ( outer ) , Zone 1A between axis 01C-01D (as highlighted)
Concreting for Blinding for Retaining Block Wall Strip Footing at North Administration Building at Zone
Surface Preparation and Primer Coating for ETFE pump Room # 6098 for Foundation at Zone 2H, Axis 02A
Single Layer of 4mm thick Modified Bituminous WaterProofing Membrane for ETFE pump Room # 6098 fo
Concreting for Devonian garden AHU RC foundation (near 2nd) at Zone 2M , Axis 02AM-02AL (as highlig
Level and Location for Infill wall ( inner ) ( Stage 1 ) at Zone 1D at Axis 01L-01M (as highlighted)
Level and Location for Infill wall ( outer ) , Zone 1A between axis 01C-01D (as highlighted)
Level and Location for North Administration Building RC Foundation P3 and P9 , Zone 2Q ,Between Axis
Level and Location for Infill wall ( outer ) , Zone 2A between axis 02C-02D Level From 863.55 to 869.158
Level and Location for Devonian garden AHU RC foundation (near 2nd) at Zone 2M , Axis 02AM-02AL (as
Level and Location for Kicker of Retaining wall from Axis 02C-02E Zone 6&7 , (As Highlighted)
Level and Location for Diaphragm wall Kicker ( 3rd Span ) at Zone 1E , Axis 01P (As Highlighted)
Level and Location for MCPE 2 Roof Slab from Axis 02AC-03K , Zone 2J (As Highlighted) Level 875.85
Level and Location for 2nd floor roof slab at south small mosque , Zone 2B , Axis F-G, 1-3 (as highlig
Level and Location for Beams of Energy Center at Grid 0-4 / A-C Level Upto 878.50 (As Highlighted)
Level and Location for Wall of Retaining wall from Axis 01P-01Q and 01R-01S , Zone 2&3 , Level Upto 8
Level and Location for Wall of Retaining wall from Axis 01P-01Q and 01R-01S , Zone 2&3 , Level Upto 8
Level and Location for South small mosque , Sloping Slab and Parapet, Axis D-F/1-2 , F-G/1 Zone 2B (a
Level and Location for Column of Energy Center at Grid 0-1/C ( 1no ) Level upto 878.00 (As Highlighted)
Level and Location for Energy center Columns at axis 7-11/A Level upto 884.50 (As Highlighted)
Inspection for Installation of MV Line Pit - D/MV/06, D/MV/13, D/MV/21, D/MV/30, D/MV/27, D/M
Surface Preparation and Primer Coating for Central Bridge Abutment Wall ( Outer Side ) Axis 02AL-02AK,
Inspection of Sand bedding under pipe for Heating and Chilled Water Line at Zone-C&H - As highlighted
Steel Reinforcement for MCPE 2 Roof Slab from , Axis 02AC-03K Zone 2J (As Highlighted)
"Inspection and Compaction test backfilling Sub-grade 3rd Layer (3 of 7) around LV Line Pit G/LV/18, G
Inspection for Laying of Red Tiles and Warning Tape above the pipe for MV Line from C/MV/14 to C/MV/
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 8) for LV Line Pit K/LV/23, K/L
Inspection and Compaction Test for backfilling Sub-Grade 6th Layer (6 of 10) for wing wall of SBC-03 - A
Inspection and compaction test for backfilling Sub-grade 3rd Layer (3 of 4) around MV Line Pit D/MV/04
"Inspection of Formwork and Concrete Pouring For Wall of Sub-station - R1 at Zone-C - as highlighted "
Inspection for Installation of Stone Cladding without Copping for Seating Area 3 - 23 at Zone-K (As Highl
Inspection for Installation of Slab for MV Line Pit - B/MV/10, G/MV/08, G/MV/36, G/MV/07 at Zone-B
"Inspection of Formwork and Concrete Pouring for Slab of MV Line Pulling Pit - C/MV/07, C/MV/08,
"Inspection of Steel Reinforcement for Slab of MV Line Pulling Pit - C/MV/07, C/MV/08, C/MV/09, C
Inspection of Excavation for Sub-station - R5 and R6 at Zone-G&K - as highlighted
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 2) above Red Tiles for MV
Inspection and Compaction test for backfilling Sub-grade 8th Layer (8 of 10) for wing wall of SBC-04 - As
Inspection and Compaction Test for backfilling Sub-Grade 5th Layer (5 of 10) for wing wall of SBC-03 - A
Inspection of Blinding Concrete under MV Line Pit D/MV/28 at Zone-D - as highlighted
Inspection of Excavation for MV Line Pit D/MV/28 at Zone-D - as highlighted
"Inspection and Compaction test backfilling Sub-grade 1st Layer (1 of 7) around LV Line Pit G/LV/18, G
Inspection and Compaction test for backfilling Sub-grade 6th Layer (6 of 10) for above SBC-07 - as highl
Inspection and Compaction Test for backfilling Sub-grade 7th Layer (7 of 8) for MV Line Pit B/MV/11 at Z
"Inspection of Sand bedding under pipe for Heating & Chilled Water Line at Zone-L - As highlighted (Sto
Inspection and Compaction test for backfilling Sub-grade 14th Layer (14 of 20) for SBC-07 Expansion join
Surface Preparation prior to start Blinding Concrete under Beam of Seating Area 3-20 at Zone-G - As Hig
Inspection and Compaction Test for backfilling Sub-base 1st Layer (1 of 1) under Boulder No. RB- 257 - a
Inspection and Compaction Test for backfilling Sub-base 1st Layer (1 of 1) under Boulder No. RB- 258 - a
Inspection for application of Base Primer and Bituminous Damp Proofing (1st & 2nd Coat) for Footing an
Inspection and compaction test for backfilling Sub-grade 1st Layer (1 of 4) around MV Line Pit D/MV/04
Inspection of Sand bedding under pipe for Heating and Chilled Water Line at Zone-L - As highlighted (Sto
Inspection and Compaction Test for backfilling Sub-Grade 4th Layer (4 of 10) for wing wall of SBC-03 - A
Inspection of Blinding Concrete under MV Line Pit - G/MV/32 at Zone-G - as highlighted
Inspection of Excavation for RO Water Line Pit POC-01 & POC-02 at Zone-B - As highlighted
Surface Preparation prior to start Blinding Concrete under Beam of Seating Area 3-21, 3-22, 3-23, 3-25,
"Inspection and Compaction test backfilling Sub-grade 2nd Layer (2 of 7) around LV Line Pit G/LV/18, G
Inspection and Compaction test for backfilling Sub-grade 7th Layer (7 of 10) for above SBC-07 - as highl
Inspection and Compaction Test for backfilling Sub-grade 8th Layer (8 of 8) for MV Line Pit B/MV/11 at Z
Inspection and Compaction test for backfilling Sub-grade 15th Layer (15 of 20) for SBC-07 Expansion join
Inspection and compaction test for backfilling Sub-grade 2nd Layer (2 of 4) around MV Line Pit D/MV/0
Excavation and Soil Preparation prior to start backfilling Layers forSecurity Perimeter Road (South), St
Surface Preparation prior to start backfilling Sub-base for Parking Area (CPH5 ST. 0+070 to 0+140,
Shuttering for MCPE 2 Roof Slab from Axis 02AC-03K Zone 2J (As Highlighted)
Concreting for MCPE 2 Roof Slab from Axis 02AC-03K Zone 2J (As Highlighted)
Shuttering for 2nd floor roof slab at south small mosque , Zone 2B , Axis F-G, 1-3 (as highlighted) S
Steel Reinforcements for Beams of Energy Center at Grid 0-4 / A-C Level upto 881.00 (As Highlighted)
Shuttering and Concreting for Beams of Energy Center at Grid 0-4 / A-C Level Upto 878.50 (As Highlight
Shuttering for Wall of Retaining wall from Axis 01P-01Q and 01R-01S , Zone 2&3 , Level Upto 868.90 (A
Concreting for Wall of Retaining wall from Axis 01P-01Q and 01R-01S , Zone 2&3 , Level Upto 868.90 (A
Shuttering and Concreting for Column of Energy Center at Grid 0-7/I-L ( 27 nos) (As Highlighted) Level
Steel Reinforcement for Infill wall ( outer ) , Zone 2A ,between Axis A-B Level From 863.55 to 869.15 (as
Steel Reinforcement for Infill wall , at Zone 1L ,between Axis 01AG -01AH ,TOC : 874.50 (as highlighted)
Steel Reinforcements for South small mosque , Sloping Slab and Parapet, Axis D-F/1-2 , F-G/1 Zone 2B
Shuttering for South small mosque , Sloping Slab and Parapet, Axis D-F/1-2 , F-G/1 Zone 2B (as highlig
Antetermite under Blinding under S.O.G of ETFE pump Room # 6098 in Zone 2H , Axis 02AA (as highligh
Shuttering for Blinding under S.O.G of ETFE pump Room # 6098 in Zone 2H , Axis 02AA (as highlighted)
Shuttering and Concreting for Column of Energy Center at Grid 0-1/C ( 1no ) (As Highlighted) Level Fro
Shuttering and Concreting for Energy center Columns at axis 7-11/A Level upto 884.50 (As Highlighted)
Installation of PVC Conduit (Dia. 25mm) for Lighting (LED F1/CE) at the Promenade & Canopies Cresce
Installation of straight UPVC Conduit (Dia. 160mm) Medium Voltage Ductbank (H/MV/07 to H/MV/28)
Installation of straight UPVC Conduit (Dia. 160mm) Medium Voltage Ductbank (B/MV/05 to B/MV/14) a
Installation of straight PVC Conduit for Lighting System (Linear LED light) at the Large Mosque (betw
Installation of PVC Conduit (Dia.25mm) & Boxes for Voice and Data (CAM, Data Outlet for Door Contro
Rough Coat (Spatter Dash) Prior to Plastering for Walls Along Ramps (Both sides), at Site Tower 2, as
Inspection of Plastering for all walls (All sides) at Ground Floor Inside Site Tower 2, as per the highli
Inspection of 2nd layer Gravel Backfilling (50cm ht) surround the Foundation & Wall of Wet Well E, I
Inspection & Compaction tests of Single Layer (Sub-Base) Backfilling above Sand Cover for Low Curre
Inspection & Compaction tests of Single Layer (Sub-Base) Backfilling above Sand Cover for Electric
Coordinates & Levels of Wall for Decant Sump-D4 Inside Water Play garden, at Water Garden as highli
Installation of UPVC conduit (4x110mm) Low Current Ductbank no. FG/D-TL/01 (TELECOM) in between M
Installation of UPVC conduit (2x110mm) Low Current Ductbank no. FF/D-FS/04 (Fire & Security) in b
Inspection & Compaction tests of Single Layer (Sub-Grade) Backfilling (Prior to Sub base layer) Betwee
Excavation and Bed preparation for Sub Surface Drainage Pipes (dia 160 & 110mm) (for Trees) At Top
Excavation and Bed preparation for Sub Surface Drainage Pipes (dia 160 & 110mm) (for Trees) At Top
Inspection of 1st layer Gravel Backfilling (50cm ht) surround the Foundation & Wall of Wet Well E (At
Concrete Pouring & Shuttering for Dome of New Ticketing Booth # 4A, As per Attached Highlighted D
Inspection of Levels for Dome of New Ticketing Booth # 4A, As per Attached Highlighted Drawing's.
Gravel (Drainage) & Geo Textile (Filter membrane Terrain 1000) for Planting area along Inner Seat Wa
Excavation & Surface preparation for Planting area along Inner Seat Walls, Inside Physic garden, as
Steel reinforcements for North Administration Building RC Foundation P3 and P9 , Zone 2Q ,Between Axi
Shuttering for North Administration Building RC Foundation P3 and P9 , Zone 2Q ,Between Axis 02AZ - 0
Concreting for North Administration Building RC Foundation P3 and P9 , Zone 2Q ,Between Axis 02AZ - 0
Concreting for Retaining wall (wall) at Axis 02F to 02G , Zone 6 & 7 (as highlighted)
Shuttering for Devonian garden AHU RC foundation (near 2nd) at Zone 2M , Axis 02AM-02AL (as highligh
shuttering for Child Care Walls ( W2 , W3 ( 2nos) & W7 ) at Zone 2N (As Highlighted)
Concreting for Devonian garden wall , Zone 2M Axis 02AN-02AO TOW 874.50 ( As Highlighted)
Single layer of 4mm thick modified bituminous waterproofing for side and top of foundation and wall u
Protection layer os 4mm thick bituminous protection board for side and top of foundation and wall upt
Surface preparation and primer coating for side and top of foundation and wall upto level 873.00 at d
Concreting for perimeter wall upper part for TIP zone 2R Axis 02BC to tip, (as highlighted) TOC 877.4
Concreting for mass Concrete under Strip footing at Zone 1K ( Outer ) Axis 01AD-01AE-01AF , TOC : 86
Steel Reinforcements for Wall for Retaining wall from Axis 01P-01Q , and 01R-01S , Zone 2 (as highlight
Concreting for Infill wall (outer) at Zone 1A at Axis 01B-01C (as highlighted)
Filed joint jacketing for Pre-insulated Chilled Water Pipes (dia 200mmØ & dia 150mmØ& dia 110mm
Inspection for Casting the Blinding Concrete under Beam of Seating Area 3-20 at Zone-K - As Highlighte
Inspection and Compaction test for backfilling Sub-grade 5th layer (5 of 5) above SBC-06 - at Zone - 4 -
Inspection and Compaction test for backfilling Sub-grade 4th Layer (4 of 5) above Sand around Fire Water
Inspection and Compaction test for backfilling sub-grade 7th Layer (7 of 7) for MV Line Pit B/MV/02 at Z
Inspection and Compaction test for backfilling sub-grade 7th Layer (7 of 7) for Non potable water line P
Inspection and Compaction Test for backfilling Sub-grade 6th Layer (6 of 8) for MV Line Pit B/MV/11 at Z
Inspection and Compaction test for backfilling Sub-grade 13th Layer (13 of 20) for SBC-07 Expansion join
Inspection and Compaction test for Sub-base 2nd Layer (2 of 2) for Car Park-H (CPH6 - ST.0+020 to 0+130
Inspection and Compaction Test for backfilling Sub-Grade 3rd Layer (3 of 10) for wing wall of SBC-03 - A
Inspection of Sand covering for protection of pipe for Heating and Chilled Water Line at Zone-g - As high
Inspection for Installation of Pit and Slab for MV Line Pit - H/MV/31 at Zone-H - As Highlighted (SCR:
Inspection of Blinding Concrete under Heating & Chilled Water Line Isolation Pit for L/DC/13 at Zone-L -
Inspection of Excavation for Heating and Chilled Water Line Pit L/DC/13 at Zone-L - As highlighted
Inspection of Blinding Concrete under Non-Potable Water Line Isolation Pit for POC-NPW/PT3 at Zone-K
Inspection of Blinding Concrete under Heating & Chilled Water Line Isolation Pit for G/DH/06, G/DH/07 a
Inspection of Excavation for Heating & Chilled Water Line at Zone-L - As highlighted
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 2) for Parking Area CPH @ Zone-
Inspection of Sand Covering for protection of pipe for LV Line between K/LV/41 to K/LV/05 at Zone-K - a
Surface Preparation prior to start backfilling for LV Line Pit K/LV/05, K/LV/14, K/LV/42, K/LV/8, K/LV/41
Inspection and Compaction test for backfilling Sub-grade 4th layer (4 of 5) above SBC-06 - at Zone - 4 -
Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 5) above Sand around Potable
Inspection and Compaction test for backfilling Sub-grade 3rd Layer (3 of 5) above Sand around Fire Water
Inspection and Compaction test for backfilling sub-grade 6th Layer (6 of 7) for MV Line Pit B/MV/02 at Z
Inspection and Compaction test for backfilling sub-grade 6th Layer (6 of 7) for Non potable water line P
Inspection and Compaction Test for backfilling Sub-grade 5th Layer (5 of 8) for MV Line Pit B/MV/11 at Z
Inspection and Compaction test for backfilling Sub-grade 12th Layer (12 of 20) for SBC-07 Expansion join
Inspection of Repairing work for Telecommunications line Pit B/TL/34 at Zone-B - As Highlighted (ZH
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 2) above Red Tiles for MV
"Inspection for Laying of Red Tiles and Warning Tape above the pipe for MV Line from C/MV/41 to C
"Inspection of Sand bedding under pipe for MV Line from C/MV/09 to C/MV/11 and C/MV/37 to C/MV/24
Inspection and Compaction test for 5th Layer backfilling between duct tunnel wall of MCPE 3 and Buttr
Inspection and Compaction test for 3rd Layer of Backfilllng between duct tunnel Shaft of MCPE 1 and B
Inspection and Compaction test for 2nd layer of backfilling for MCPE 1 duct tunnel wall and Buttress o
Inspection and Compaction test of 7th Layer of Backfilling Subgrade for Draniage Pipe at Jurassic Gar
Inspection Of Pipe Installation For Non-Potable Water (Irrigation Main Line); (200 mmØ- UPVC-Class-
Inspection and compaction test 3rd and 4th layer of gravel Backfill for Diaphragm wall Foundation , Gri
Inspection and Compaction test of 4th and 5th Layer Backfilling Subgrade for Soak Away Pipe at Jurass
Steel reinforcements and Shuttering for Lintels and stiffeners columns of blockworks at South small mosq
Level and Location for Devonian garden wall , Zone 2M Axis 02AN-02AO TOW 874.60 (as highlighted)
Level and Location for Stiffner of Buttress BII-12 ( Inner ( 1no ) ), at Zone 1C Axis 01J ( As Highlihted )
Level and Location for Diaphragm wall Beam at Zone 1E , Axis 01M (As Highlighted) TOC 869.00
'Pipe Installation(450&400&315mm Ø- UPVC Pipes-Class 4 ) for Storm Water pipe Out Fall-O includ
'Bedding of Gravel 3/8" and Geotextile surrounding in pipes (450&400&315mm Ø- UPVC Pipes-Class
Antetermite under Blinding for Retaining Block Wall Strip Footing at North Administration Building a
Inspection of Sand Covering for protection of pipe for LV Line between B/LV/24 to B/LV/27 at Zone-B - a
Inspection of Backfilling Gravel 1st Layer (1 of 2) for LV Line Pit B/LV/40, B/LV/50, B/LV/39, B/LV/46,
Inspection of Concrete (Plain) Pouring for the Duct Bank of LV Line from B/MV/54 to B/MV/40 at Zone-
Inspection of Steel Reinforcement for Beam of Seating Area 3-25 at Zone-K - As Highlighted
Concrete Pouring for Blinding under Seat walls (3 no's) Inside Outer canopy 2, at Physic Garden, as hi
Inspection of First Layer Block Layout for Wall of Meeting Room, at Grid (5/C), at Security & Fire C
Plaster Guide Points & Accessories Prior to Plastering for Walls Along Ramps (Both sides), at Site Tow
2nd Coat Cementitiuos water proofing for Wall (Outer Face) of Boundary wall @ Grid (1-13/Right Side)
1st Coat Cementitiuos water proofing for Wall (Outer Face) of Boundary wall @ Grid (1-13/Right Side)
Surface preparation prior to Cementitiuos water proofing & Stone Cladding for Wall (Outer Face) of B
Coordinates & Levels for Foundation & Kicker of Decant Sump-D1 at Boat garden, Inside Water Gard
Installation of PVC Conduit (Dia.25mm) & Boxes for Fire Alarm (Transmitter Beam Detector, Receiver
Installation of Straight PVC Conduit (Dia. 25mm) and Boxes for Fire Alarm (Speaker) in the Promenad
Inspection of 1st layer Gravel Backfilling (50cm ht) for Sub Surface Drainage Pipes (dia 160 & 110mm)
Inspection & Compaction tests of 3rd (Final) Layer Backfilling (Sub-Base) (Prior to Blinding under har
Surface preparation Prior to Backfilling Between Seat Walls (at B.O.B Level), Inside Butterfly Garden,
Concrete pouring & Shuttering for Foundation & Kicker of Decant Sump-D1 at Boat garden, Inside W
Steel Reinforcement for Foundation & Kicker of Decant Sump-D1 at Boat garden, Inside Water Garde
Steel reinforcements for Energy center Columns at axis 7-11, A (as highlighted)
Shuttering for Devonian garden wall , Zone 2M Axis 02AN-02AO TOW 874.60 (as highlighted)
Concreting for Large Mosque Lower Second Floor wall ( W3 ) and column ( C5 ) for, Zone 1G Axis ( 5-6 / E
Shuttering for Stiffner of Buttress BII-12 ( Inner ( 1no ) ), at Zone 1C Axis 01J ( As Highlihted )
Concreting for Stiffner of Buttress BII-12 ( Inner ( 1no ) ), at Zone 1C Axis 01J ( As Highlihted )
Steel Reinforcements for Diaphragm wall for Kicker and Wall ( Inclined Wall ) at Zone 1E , Axis 01M (As
Steel Reinforcement for Diaphragm wall Beam at Zone 1E , Axis 01M (As Highlighted)
Shuttering for Diaphragm wall Beam at Zone 1E , Axis 01M (As Highlighted)
Inspection of Installation and Bolt Tightening for Lightning Support in Crescent 01 G-L 01I, 01Q, 01
Installed Base Extrusion and Base Seal between Axis 01/T - 01/U.
Installed Base Extrusion and Base Seal between Axis 01/S - 01/T.
Installed Base Extrusion and Base Seal between Axis 01/R - 01/S.
Installed Base Extrusion and Base Seal between Axis 01/Q - 01/R.
Installed Base Extrusion and Base Seal between Axis 01/P - 01/Q.
Steel Reinforcements for South Small Mosque Staircase ( Step , Riser , Landing ) from ground to 1st Fl
Excavation and Surface Preparation and Inspection of Rock Level under Strip footing ( Inner and Outer ) a
Sand bedding for Drainage Pipes at Child Care at Zone 2N ( As Highlighted )
Inspection and Compaction test for 1st and 2nd Layer of Backfilllng at diaphragm wall at Zone 2N , Axi
Inspection and Compaction test for 1st and 2nd Layer of Gravel backfilling BetweenTUNNEL 1 Wall and
Block Work for Ground Floor at South small mosque Axis (D-E, 2) (D-E, 7) (D-E, 8) at Zone 2B (As Highlig
Block Work for Ground Floor at South small mosque Axis (D-E, 2) (D-E, 7) (D-E, 8) at Zone 2B (As Highl
1st layer of Block Work for Ground Floor at South small mosque Axis (B-C, 2) (B, 2-4) (4, A-B) (5, A-B) (B,
Block Work for Ground Floor at South small mosque Axis (B-C, 2) (B, 2-4) (4, A-B) (5, A-B) (B, 6-7) (7, A-
Level and Location for Infill wall ( inner ) ( Stage 2 ) at Zone 1D at Axis 01K-01L (as highlighted)
Level and Location for Large Mosque Lower Second Floor wall ( W3 ) and Column ( C5 ) for, Zone 1G Axis
Level and Location for MCPE 2 wall & counterfort from 02AG-02AH Zone 2K (As Highlighted) From 871.
Level and Location for Plain concrete under S.O.G at Devonian Garden in Zone 2M (as highlighted)
Shuttering for Infill wall ( inner ) ( Stage 2 ) at Zone 1D at Axis 01K-01L (as highlighted)
Concreting for South Small Mosque Staircase ( Step , Riser , Landing ) from ground to 1st Floor, zone
Shuttering for perimeter wall upper part for TIP zone 2R Axis 02BC to tip, (as highlighted) TOC 877.47
Shuttering for Large Mosque Lower Second Floor wall ( W3 ) and Column ( C5 ) for, Zone 1G Axis ( 5-6 /
Surface Preparation and Base Primer Coating for Front Canopy Foundation at Zone 1 Axis 01C-01J level
Two coats of Bituminous DampProofing for Front Canopy Foundation at Zone 1 Axis 01AF-01Z & Axis 01
Protection Layer of 4mm Thick Bituminous Protection board for Front Canopy Foundation at Zone 1 , A
Surface Preparation and Primer Coating on Blinding under Foundation of Retaining wall,From Axis 01W-
Cementitous Water Proofing on Blinding under Foundation of Retaining wall,From Axis 01W-01Z , Zon
Two Layers of 4mm thick Modified Bituminous waterProofing Membrane on Blinding under Foundation
Protection Layer of 4mm thick Bituminous Protection Board on Blinding under Foundation of Retaining
Surface Preparation and Primer Coating for Central Bridge Abutment Wall, zone 4 , Axis 02AG-02AH (As
Two Layers of 4mm thick Modifid Bituminous waterProofing Membrane for Central Bridge Abutment Wall
Protection Layer of 4mm thick bituminous Protection Board for Central Bridge Abutment Wall, zone 4 ,
Shuttering for MCPE 2 wall & counterfort from 02AG-02AH Zone 2K (As Highlighted) From 871.00 to 87
Concreting for MCPE 2 wall & counterfort from 02AG-02AH Zone 2K (As Highlighted) From 871.00 to 87
Steel Reinforcements for Infill wall Stiffner ( inner ) BII-11 , at Zone 1C at Axis 01L (as highlighted)
Steel Reinforcements for Infill wall Stiffners ( 2nos ) ( inner ) BII-14 & BII-15 , at Zone 1D at Axis 01K &
Antetermite for under Plain concrete under S.O.G of Devonian Garden in Zone 2M (as highlighted)
Shuttering for Plain concrete under S.O.G at Devonian Garden in Zone 2M (as highlighted)
Concreting for Plain concrete under S.O.G at Devonian Garden in Zone 2M (as highlighted)
Pre insulated Chilled water Pipes (S&R) ( laying ,Aligment ,Leveling and fit up) 400mmØ From po
'Pipe Installation(315&160mm Ø- UPVC Pipes-Class 4 ) for Storm Water pipe Out Fall-G including (M
'Pipe Installation (315&200mm Ø- UPVC Pipes-Class 4 ) for Storm Water pipe Out Fall-Y including (
'Bedding of Gravel 3/8" and Geotextile surrounding in pipes (315&160mm Ø- UPVC Pipes-Class 4 ) for
'Bedding of Gravel 3/8" and Geotextile surrounding in pipes (315&200mm Ø- UPVC Pipes-Class 4 ) for
Inspection for Installation of Stone Cladding without Copping for Seating Area 3 - 22 at Zone-G (As Highl
Surface Preparation prior to start backfilling for LV Line Pit K/LV/23, K/LV/22, K/LV/36, K/LV/37, K/LV/3
Inspection of Sand Covering Layer for Protection of LV Line from K/LV/23 to K/LV/09 at Zone-K - as high
Inspection and Compaction test for Sub-base 2nd Layer (2 of 2) for Car Park-H (CPH5 - ST.0+010 to 0+120
Inspection and Compaction test for backfilling Sub-grade 3rd layer (3 of 5) above SBC-06 - at Zone - 4 -
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 5) above Sand around Potable
Inspection and Compaction test for backfilling Sub-grade 2nd Layer (2 of 5) above Sand around Fire Wate
Inspection and Compaction test for backfilling sub-grade 5th Layer (5 of 7) for MV Line Pit B/MV/02 at Z
Inspection and Compaction test for backfilling sub-grade 5th Layer (5 of 7) for Non potable water line P
Inspection and Compaction Test for backfilling Sub-grade 4th Layer (4 of 8) for MV Line Pit B/MV/11 at Z
Inspection and Compaction test for backfilling Sub-grade 11th Layer (11 of 20) for SBC-07 Expansion join
Inspection and Compaction test for backfilling Sub-grade 7th Layer (7 of 10) for wing wall of SBC-04 - As
"Inspection for Installation of Slab for MV Line Pulling Pit - G/MV09, G/MV/34, G/MV/35, H/MV/28,
"Inspection of Formwork and Concrete Pouring for Wall of MV Line Pit - C/MV/07, C/MV/27, C/MV/10
Inspection of Sand Covering Layer for Protection of MV Line from C/MV/43 to C/MV/17 at Zone-C - as hig
Inspection for Laying of Red Tiles and Warning Tape above the pipe for LV Line from G/LV/20 to G/LV/58
Installation of straight UPVC Conduit (Dia. 110mm) for Low Voltage System (Power, Emergency) at Gr
Installation of straight PVC Conduit (Dia. 25mm) & Boxes for Lighting System (LED N, W1, W1/E) at Gr
Installation of straight UPVC Conduit (Dia. 75mm) Low Current (Fire Alarm & Security) at Ground Flo
Installation of straight PVC Conduit (Dia. 25mm) and Boxes for Voice and Data (CAM) at Site Tower N
Installation of straight PVC Conduit (Dia. 25mm) and Boxes for Security (CAM) at Ground Floor Site
Installation of straight PVC Conduit (Dia. 25mm) and Boxes for Fire Alarm (Smoke Detector) at Groun
Installation of PVC Conduit (Dia.25mm) & Boxes for Security System (Card Reader) at the Cenozoic G
Installation of PVC Conduit (Dia.25mm) & Boxes for Voice and Data (CAM, Data Outlet for Door Contro
Installation of PVC Conduit (Dia.25mm) & Boxes for Fire Alarm (Smoke Detector, Speaker, Break Glass
Installation of straight UPVC Conduit (Dia. 160mm) Medium Voltage Ductbank no. FF/D-MV/06 (F/MV/
Installation of Low Voltage Ductbank UPVC Conduit 75mm (Emergency) in between Manhole (MH/WG/
Installation of UPVC conduit (dia.25mm) and Box for Lighting at the Crescent -2 (Cafeteria Undercroft L
Installation of stub-up and straight UPVC conduit for Lighting (Power - dia. 32mm) at the Boat Garden a
Installation of UPVC conduit (2x75mm) Low Current Ductbank (Fire & Security) in between Manhole
Installation of UPVC conduit (2x75mm) Low Current Ductbank (TELECOM) in between Manholes (MH/W
Installation of UPVC conduit (2x75mm) Low Current Ductbank (Fire & Security) in between Manholes (
Installation of PVC Conduit (Dia. 25mm) & Boxes for Power System (Disconnect Switch) at New Ticket
"Inspection of Excavation for MV Line from C/MV/09 to C/MV/11 and C/MV/37 to C/MV/24 at Zone-C i
Surface Preparation prior to start backfilling for LV Line Pit B/LV/40, B/LV/50, B/LV/39, B/LV/46, B/LV/
Surface Preparation prior to start backfilling for LV Line Pit G/LV/18, G/LV/22, G/LV/58, G/LV/13 at Zone
"Excavation for Storm Water Line from MH-G-12 to MH-G-08 including branch, Manhole MH-G-08, MH-
Inspection for Casting the Blinding Concrete under Beam of Seating Area 3-23 at Zone-K - As Highlighte
Inspection for Casting the Blinding Concrete under Beam of Seating Area 3-25 at Zone-K - As Highlighte
Inspection of Sand covering for protection of pipe for Heating and Chilled Water Line at Zone-B - As high
Inspection for Installation of LV Line Junction Pit - B/LV/18, B/LV/47, B/LV/46, B/LV/39, B/LV/50, B
Inspection for Installed Gabions inside Tunnel of Butterfly Garden , as Highlighted area in attached D
Protection Layer of 4 mm Thk. Bituminous Protection Board for External Surfaces of Wet Well E (All S
Protection Layer of 4 mm Thk. Bituminous Protection Board for External Surfaces of Wet Well F (All S
Surfaces Preparation Prior to Backfilling surround the Foundation & Wall of Wet Well E (At B.O.B Leve
Surfaces Preparation Prior to Backfilling surround the Foundation & Wall of Wet Well F (At B.O.B Leve
Sand Bedding for Low Current Lines (MH/PG/LC/19-21) and Fire Alarm & Security (MH/PG/FA/14-15), In
Sand Bedding for Electrical Lines of Emergency (MH/PG/EM/15-16) and Low Voltage (MH/PG/LV/14-15),
Excavation and Bed preparation for Irrigation (Sub main line 160 dia with Sleeves dia 200), at Bottom
Grouting for Stone Cladding of Boundary wall (Outer Side) at Span 15 & 16, As per Attached Highligh
Grouting for Stone Cladding of Boundary wall (Outer Side) at Span 17 & 18, As per Attached Highligh
Shuttering for Kicker for Retaining wall from Axis 01P-01Q , and 01R-01S , Zone 2 (as highlighted)
Warning Tiles & Tape on Low Current Lines (MH/PG/LC/02-08) and Fire Alarm & Security lines (MH/PG/
Concreting for Kicker for Retaining wall from Axis 01P-01Q , and 01R-01S , Zone 2 (as highlighted)
Warning Tiles & Tape on Electrical Lines of Low Voltage (MH/PG/LV/02-06) and Emergency (MH/PG/EM/
Steel Reinforcement for Infill wall ( outer ) , Zone 1A between axis 01C-01D (as highlighted)
Excavation & Bed Preparation for Low Current Lines (MH/PG/LC/19-21) and Fire Alarm & Security (MH
Steel Reinforcement for RC Foundations of Retaining wall from Axis 02C-02E , Zone 6&7 (as highlighted
Excavation & Bed Preparation for Electrical Lines of Emergency (MH/PG/EM/15-16) and Low Voltage (
Concreting for RC Foundation of Retaining wall from Axis 02C-02E , Zone 6&7 (as highlighted)
Shuttering for RC Foundation of Retaining wall from Axis 02C-02E , Zone 6&7 (as highlighted)
Gravel (Drainage) & Geo Textile (Filter membrane Terrain 1000) for Plantation area's Inside Outer C
Gravel (Drainage) & Geo Textile (Filter membrane Terrain 1000) for Planting area Inside Outer Canop
Level and Location for mass Concrete under Strip footing at Zone 1K ( Outer ) Axis 01AD-01AE-01AF , T
Gravel (Drainage) & Geo Textile (Filter membrane Terrain 1000) for Planting area Inside Outer Canop
Level and Location for Large Mosque for ( Lower Second Floor ) Beams ( B206 & B 207 ) Zone 1G , Leve
Excavation & Surface preparation for Plantation area's Inside Outer Canopy 1, at Physic garden, as
Excavation and Bed Preparation for soak away drainage pipes at ,Zone 1L & 1M , ( As per highlighted )
Inspection and Compaction test for 2nd Layer of ( Gravel ) Backfilling in Energy Center, Axis 01-29/N-Q
Inspection and Compaction test for 1st layer of 8th layer backfilling for MCPE 1 duct tunnel wall and B
Inspection and Compaction test of 5th and 6th Layer of Backfilling Subgrade for Draniage Pipe at Jur
Inspection and Compaction test for 4th Layer backfilling between duct tunnel wall of MCPE 3 and Buttr
Inspection and Compaction test for 2nd Layer of Backfilllng between duct tunnel Shaft of MCPE 1 and B
Inspection and compaction test 1st and 2nd layer of gravel Backfill for Diaphragm wall Foundation , Z
Inspection and Compaction test for 1st Layer of ( Gravel ) Backfilling in Energy Center, Axis 01-29/N-Q
Excavation & Surface preparation for Planting area Inside Outer Canopy 3, at Physic garden, as high
Excavation & Surface preparation for Planting area Inside Outer Canopy 2, at Physic garden, as high
Grouting of Installed Anchor bolt and under Baseplate at Zone 2H OUTER ring beam (as highlighted)
Grouting of Installed Anchor bolt and under Baseplate at Zone 2F OUTER ring beam (as highlighted)
Concreting for central bridge abutment grid 01/M zone 4 (as highlighted)
Steel reinforcements for outer Infill wall Beam at axis 02E - 02F , Zone 2B (as highlighted) (1st) KAIG3
Concreting for Stairs at Large Mosque Zone 1G Axis 5.1-6, E-F from 871.10 to 874.60 (as highlihgted)
Level and Location for Energy Center, Beam at Grid 17-28/M at level 878.50 (As Highlighted)
Steel Reinforcements for Column of Energy Center at Grid 0-1/C ( 1no ) and 0-7/I-L ( 27 nos) (As Highl
Protection Layer of 4mm thick Bituminous Protection Board for diaphragm wall for Foundations and wall
Mechanical Pipe sleeve Installation , At Crescent 2 2H(MCPE2); ( dia110&315&160mm UPVC Pipe Clas
Pre insulated Chilled water Pipes (S&R) 150mmØ (laying ,Aligment ,Leveling and fit up) (E:647341.89
Steel reinforements for 2nd floor roof slab at south small mosque zone 2B Axis F-G, 1-3 (as highligh
Pre insulated Chilled water Pipes (S&R) 65mmØ ( laying ,Aligment ,Leveling and fit up) (E:647614.4
Antetermite for mass Concrete under Strip footing at Zone 1K ( Outer ) Axis 01AD-01AE-01AF , TOC : 86
Shuttering for Diaphragm wall ( Vertical )at Zone 1E Axis 01M (As Highlighted) Upto Level 868.50
Steel Reinfocement for Rc Foundations ( P11 , P11 , P12 ) for North Administration Building, Axis 02AY-0
Shuttering for Rc Foundations ( P11 , P11 , P12 ) of North Administration Building, Axis 02AY-02AZ , 02
Steel reinforcements for Retaining wall (wall) at Axis 02F to 02G Zone 6 & 7 (as highlighted)
Inspection and Compaction test for backfilling Sub-grade 6th Layer (6 of 10) for wing wall of SBC-04 - As
Inspection and Compaction Test for backfilling Sub-Grade 2nd Layer (2 of 10) for wing wall of SBC-03 - A
Inspection and Compaction test for backfilling Sub-grade 2nd layer (2 of 5) above SBC-06 - at Zone - 4 -
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 5) above Sand around Potable
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 5) above Sand around Fire Water
Inspection and Compaction test for backfilling sub-grade 4th Layer (4 of 7) for MV Line Pit B/MV/02 at Z
Inspection and Compaction test for backfilling sub-grade 4th Layer (4 of 7) for Non potable water line P
Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 8) for MV Line Pit B/MV/11 at Z
Inspection and Compaction test for backfilling Sub-grade 10th Layer (10 of 20) for SBC-07 Expansion join
Inspection of Blinding Concrete under MV Line Pit - C/MV/43, D/MV/13, D/MV/21, D/MV/30, D/MV/2
Inspection of Excavation for Sub-station - R2 and R12 at Zone-B&F - as highlighted
Inspection of Sand Covering Layer for Protection of MV Line from C/MV/14 to C/MV/18 at Zone-C - as hig
Inspection and Compaction Test for backfilling Sub-Grade 1st Layer (1 of 10) for wing wall of SBC-03 - A
Inspection of Excavation for LV Line from L/LV/07 to M/LV/04 at Zone-L&M including Branch and Pit
Surface preparation prior to start backfilling for diaphragm wall grid 1P (as highlighted)
Excavation and Surface Preparation Prior to start for Foundation ( 4 spans ) ( INNER & OUTER ) at Zone
Surface preparation prior to start backfilling at diaphragm wall zone 2N axis 02AQ (as highlighted)
Inspection and compaction test for 1st layer of backfilling in Energy center axis 16-20 / N-Q (as highli
Inspection and Compaction Test for 9th layer Backfilling for Energy Center 2 (As Highlighted) Zone 5A A
Installed Aluminum Caps between Axis 02/X - 02/Y.
Level and Location for Kicker for Retaining wall from Axis 01P-01Q , and 01R-01S , Zone 2 (as highlighte
Installed Aluminum Caps between Axis 02/W - 02/X.
Level and Location for RC Foundations of Retaining wall from Axis 02C-02E , Zone 6&7 (as highlighted)
Installed Aluminum Caps between Axis 02/V - 02/W.
Level and Location for Child Care ,Grade Beam at Zone 2N , (As Highlighted)
Level and Location for Diaphragm wall , Columns and Walls at zone 1N , Axis 01AM (As Highlighted) upt
Level and Location for Devonian garden wall (3rd) Zone 2M Axis 02AN-02AO (as highlighted) TOC 874.80
Concreting for Lower Second Slab Upstand ( UB 3 ) at Large Mosque at Zone 1G Axis ( 5-6 / C-F ) (As Hi
Shuttering for Large Mosque for ( Lower Second Floor ) Beams ( B206 & B 207 ) Zone 1G , Level fromm
Steel reinforcements for Child Care Grade Beam at Zone 2N Child Care (As Highlighted)
Steel reinforcements for Devonian garden wall , Zone 2M Axis 02AN-02AO (as highlighted)
Steel Reinforcements for Kicker and wall for Retaining wall from Axis 01P-01Q , and 01R-01S , Zone 2 (a
Shuttering for Diaphragm wall , Columns and Walls at zone 1N , Axis 01AM (As Highlighted) upto 872.50
Concreting for Devonian garden wall (3rd) Zone 2M Axis 02AN-02AO (as highlighted) TOC 874.80
Shuttering for Devonian garden wall (3rd) Zone 2M Axis 02AN-02AO (as highlighted) TOC 874.80
Inspection of Sand bedding under pipe for LV Line from B/LV/19 to B/LV/18 at Zone-B - as highlighted (S
"Surface Preparation prior to start backfilling for Non potable water line Pit POC-40, POC-44 at Zone-K
Surface Preparation prior to start backfill above SBC-06 - at Zone - 4 - as highlighted
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 8) for MV Line Pit B/MV/11 at Z
Inspection and Compaction test for backfilling sub-grade 2nd Layer (2 of 8) around MV Line Pit G/MV/0
Inspection for backfilling Sand 2nd Layer (2 of 4) around Fire Water Line Pit for B/F/02 - as highlighted (
Inspection for backfilling Sand 2nd Layer (2 of 4) around Potable Water Line Pit for B/PW/10 - as highlig
Inspection and Compaction test for backfilling sub-grade 2nd Layer (2 of 7) for MV Line Pit B/MV/02 at Z
Inspection and Compaction test for backfilling sub-grade 2nd Layer (2 of 7) for Non potable water line
Inspection and Compaction test for backfilling Sub-grade 8th Layer (8 of 20) for SBC-07 Expansion joint
Inspection and Compaction test for backfilling Sub-grade 4th Layer (4 of 10) for wing wall of SBC-04 - As
Inspection of Sand covering for protection of pipe for Heating and Chilled Water Line at Zone-B - As high
"Excavation for Storm Water Line from MH-O-06 to MH-O-08 including branch, Manhole MH-O-08, MH-O-
Inspection for backfilling Sand 3rd Layer (3 of 4) around Potable Water Line Pit for B/PW/10 - as highlig
Inspection for Installation of Stone Cladding without Copping for Seating Area 3 - 20 at Zone-G (As Highl
Inspection of Blinding Concrete under Non-Potable Water Line Isolation Pit for NPW-ISC-15 and POC-31
Inspection for Installation of Non-Potable Water Line Pit - POC-40 & POC-44 at Zone K - as highlighted
Inspection for Installation of RO water Line Pit POC-24, ROW-ISC-13 at Zone-B&L - as highlighted
Inspection and Compaction test for backfillig Sub-grade 9th Layer (9 of 11) for Heating and Chilled Water
Inspection and Compaction test for backfilling Sub-grade 4th Layer (4 of 4) for MV Line Pit D/MV/31,
Inspection and Compaction test for backfilling sub-grade 1st Layer (1 of 8) around MV Line Pit G/MV/0
Inspection and Compaction test for Sub-base 1st Layer (1 of 2) for Car Park-H (CPH6 - ST.0+020 to 0+130
Surface Preparation prior to start backfilling for MV Line Pit B/MV/11, L/MV/11 & L/MV/14 at Zone - B&
Surface Preparation prior to start Water Proofing and WaterProofing for MV Line Pit B/MV/11 at Zone- B
Inspection for backfilling Sand 1st Layer (1 of 47) around Fire Water Line Pit for B/F/02 - as highlighted
Inspection for backfilling Sand 1st Layer (1 of 4) around Potable Water Line Pit for B/PW/10 - as highlig
Inspection and Compaction test for backfilling sub-grade 1st Layer (1 of 7) for MV Line Pit B/MV/02 at Z
Inspection and Compaction test for backfilling sub-grade 1st Layer (1 of 7) for Non potable water line P
Inspection and Compaction Test for backfilling Subgrade 5th Layer (5 of 6) for MV Line Pit L/MV/02, L
Inspection and Compaction test for backfilling Sub-grade 7th Layer (7 of 20) for SBC-07 Expansion joint
Inspection of Blinding Concrete under LV Line Pit - B/LV/45 at Zone-B - as highlighted
Inspection of Excavation for Non-Potable Water Line at Zone-L - as highlighted
Inspection of Excavation for Heating and Chilled Water Line at Zone-L including pit L/DC/12 & L/DC/11 -
Inspection of Sand Covering Layer for Protection of LV Line from G/LV/20 to G/LV/58 at Zone-G - as high
Installation of Rock and Boulder No. WRB-56 - 3rd layer (3 of 6)
Soil Preparation under Boulder No. RB- 257
Soil Preparation under Boulder No. RB- 258
Inspection and Compaction test for backfilling Sub-grade 5th Layer (5 of 10) for wing wall of SBC-04 - As
Inspection and Compaction test for backfilling Sub-grade 1st layer (1 of 5) above SBC-06 - at Zone - 4 - a
Surface Preparation prior to start backfilling for RO water line Pit ROW-ISC-13, POC-14 at Zone-B&L - A
Inspection and Compaction test for backfilling sub-grade 3rd Layer (3 of 8) around MV Line Pit G/MV/0
Inspection for backfilling Sand 3rd Layer (3 of 4) around Fire Water Line Pit for B/F/02 - as highlighted (
Inspection and Compaction test for backfilling sub-grade 3rd Layer (3 of 7) for MV Line Pit B/MV/02 at Z
Inspection and Compaction test for backfilling sub-grade 3rd Layer (3 of 7) for Non potable water line P
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 8) for MV Line Pit B/MV/11 at
Inspection and Compaction test for backfilling Sub-grade 9th Layer (9 of 20) for SBC-07 Expansion joint
Excavation for Fire & Security Distribution Line from L/FS/06 to M/FS/07 At Zone-L&M Including Branc
Excavation for Telecommunication Line from L/TL/21 to M/TL/08 at Zone-L&M Including Branch and Pit
Inspection and Compaction test for Sub-base 2nd Layer (2 of 2) for Car Park-H (CPH4 - ST.0+020 to 0+140
Inspection of Concrete (Plain) Pouring for Duct Bank of Fire & Security line between C/FS/04 and C/FS/2
Inspection of Concrete (Plain) Pouring for Duct Bank of Telecommunications line between B/TL-RC/35 a
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 2) under Heating and Chilled W
Inspection of Formwork and Concrete pouring for wall and Slab of Cesspool-1 at Zone-K - as highlighted
Inspection of Sand Covering for protection of pipe for LV Line between B/LV/15 to B/LV/47 and B/LV/55
Inspection of Sand bedding under pipe for LV Line from B/LV/44 to B/LV/28 at Zone-B - as highlighted (S
Installation of Straight PVC Conduit (Dia. 25mm) and Boxes for Security System (CAM, Card Reader) at
Installation of Straight PVC Conduit (Dia. 25mm) and Boxes for Voice & Data System (CAM) at the Cafe
Gravel (Drainage) & Geo Textile (Filter membrane Terrain 1000) for Tree Pits (17 no's) Inside Boat
Sand Cover and Protection for Low Current Lines (MH/PG/LC/02-08) and Fire Alarm & Security lines (
Sand Cover and Protection for Electrical Lines of Low Voltage (MH/PG/LV/02-06) and Emergency (MH/
Sand Bedding for Low Current Lines (MH/WG/LC/12 to 15), Fire Alarm & Security (MH/WG/FA/19 to 22)
Sand Bedding for Electrical Lines of Emergency (MH/WG/EM/18 to 21) & Low Voltage (MH/WG/LV/39 to
Concrete Pouring for Blinding under Low Current Handholes (MH/PG/LC/21) and Fire Alarm & Security
Concrete Pouring for Blinding under Electrical Handholes of Emergency (MH/PG/EM/16) and Low Volta
Concreting for Diaphragm wall (Inclined) at Zone 1E Axis 01P (As Highlighted) Level 868.75
Grouting of Installed Anchor bolt and under Baseplate at Zone 2E INNER & OUTER ring beam (as high
Grouting of Installed Anchor bolt and under Baseplate at Zone 1G OUTER ring beam (as highlighted)
Grouting of Installed Anchor bolt and under Baseplate at Zone 2L INNER & OUTER ring beam (as highl
Grouting of Installed Anchor bolt and under Baseplate at Zone 2J 2K INNER ring beam (as highlighted
Grouting of Installed Anchor bolt and under Baseplate at Zone 1D OUTER ring beam (as highlighted)
Grouting of Installed Anchor bolt and under Baseplate at Zone 1B inner ring beam (as highlighted) u
Grouting of Installed Anchor bolt and under Baseplate at Zone 1E inner ring beam (as highlighted) u
Grouting of Installed Anchor bolt and under Baseplate at Zone 1C inner ring beam (as highlighted) u
Inspection and Compaction test of 3rd and 4th Layer of Backfilling Subgrade for Draniage Pipe at Juras
Inspection and Compaction Test for 2nd Layer of Subgrade Backfilling above Rc Foundation Abutment Bri
Level and Location or Retaining wall (wall) at Axis 02F to 02G , Zone 6 & 7 (as highlighted)
Level and Location for Front Canopy Foundation at Zone 4 , Axis 01G , Level 865.06 (As Highlighted)
Installation and Survey Report for Location and Levels of Anchor bolts for Front Canopy Foundation at
Grouting of Installed Anchor bolt and under Baseplate at Zone 1D inner ring beam (as highlighted) u
Grouting of Installed Anchor bolt and under Baseplate at Zone 1C OUTER ring beam (as highlighted)
Grouting of Installed Anchor bolt and under Baseplate at Zone 1B OUTER ring beam (as highlighted)
Grouting of Installed Anchor bolt and under Baseplate at Zone 2J outer ring beam (as highlighted) usin
Concreting for roof slab of north administration building, Zone 2R, axis 02BC-02AZ (as highlighted) T
Shuttering for Retaining wall (wall) at Axis 02F to 02G Zone 6 & 7 (as highlighted)
2nd Coat Cementitous water proof coating prior Stone Cladding for ZONE 2R buttress, Infill wall & ring
2nd coat of Cementitous water proof coating prior Stone Cladding for ZONE 2Q buttress, Infill wall & ri
Steel Reinforcements for Infill wall ( Outer ) at Zone 2A at Axis 02C-02D from 863.55 to 869.15(as highl
Protection Layer of 4mm thick Bituminous Protection Board for Devonian garden foundation (near 2nd
Surface Preparation and Primer Coating for Devonian garden foundation (near 2nd) at Zone 2M , Axis
Single Layer of 4mm thick Modified Bituminous WaterProofing Membrane for Devonian garden foundati
Surface Preparation and Primer Coating forStrip Foorting, at Zone 2A , Axis 02C-02D (As Highlighted)
Single Layer of 4mm thick Modified Bitumionus Water Proofing Membrane forStrip Foorting, at Zone 2A
Surface Preparation and Primer Coating for Infill wall ( outer Part ) , at Zone 2A , Axis 02C-02D (As Highli
Single Layer of 4mm thick Modified Bituminous water Proofing Membrane for Infill wall ( outer Part ) ,
Steel Reinforcements for Infill Perimeter wall at Zone 1L at Axis 01AG-01AH TOC 876.00 ( As Highlighted
Inspection and Compaction test for 3rd and 4th layer of Gravel backfilling around TUNNEL 1 Shaft at Z
Inspection and Compaction test for 3rd Layer backfilling between duct tunnel wall of MCPE 3 and Buttr
Inspection and Compaction test for 1st Layer of Backfilllng between duct tunnel Shaft of MCPE 1 and Bu
Inspection and compaction for 3rd Layer backfilling of Internal Foundation of Energy Center at Grid 1-3
Excavation and Bed Preparation for soak away drainage pipes at Gardens Zone 2J 2K as per attached
Surface Preparation Prior to Start Backfilling in Energy Center, Axis 19-30/N-Q (As Highlighted)
Excavation for Retaining wall Foundation , Between Axis 01W to 01Y at Zone 2 (As Highlighted)
Shuttering for Front Canopy Foundation at Zone 4 , Axis 01G , Level 865.06 (As Highlighted)
Concreting for Front Canopy Foundation at Zone 4 , Axis 01G , Level 865.06 (As Highlighted)
Antitermite for plain concrete for internal foundation between axis 02-AB to 02-AZ zone 2R (as high
Grouting of Installed Anchor bolt and under Baseplate at Zone 2C & 2D Outer ring beam (as highlighted
Grouting of Installed Anchor bolt and under Baseplate at Zone 2N inner ring beam (as highlighted) usi
Grouting of Installed Anchor bolt and under Baseplate at Zone 2B inner ring beam (as highlighted) usin
Grouting of Installed Anchor bolt and under Baseplate at Zone 2M inner ring beam (as highlighted) usi
Grouting of Installed Anchor bolt and under Baseplate at Zone 2K outer ring beam (as highlighted) usi
Protection Layer of 4mm thick Bituminous Protection Board for diaphragm wall Rc footing ( top and side
Surface Preparationand Primer coating for Block Retainng wall Strip Foorting, at Zone 2C (As Highligh
Two coats of Bituminous Damp Proof Coating for Block Retainng wall Strip Foorting, at Zone 2C (As Hi
Shuttering for Blinding for Retaining Block Wall Strip Footing at North Administration Building at Zone
Level and Location for Energy Center, Columns at Grid 0-4/C-A at level 878.00 ( 16nos ) (As Highlighted)
Level and Location for Columns of Energy Center at Grid 7-14/L (24 nos) (As Highlighted) Level upto 881
Level and Location for Blinding for Retaining Block Wall Strip Footing at North Administration Buildin
Shuttering and concreting for Energy Center, Columns at Grid 0-4/C-A at level 878.00 ( 16nos ) (As Highl
Protection Layer of 4mm thick Bituminous Protection Board for MCPE 1 Walls and Counterfort at Zone 2
Shuttering and Concreting for Columns of Energy Center at Grid 7-14/L (24 nos) (As Highlighted) Level
Steel reinforcements for Front Canopy Foundation at Zone 4 Axis 01G , Level 865.06 (As Highlighted)
Steel Reinforcements for Infill wall ( inner ) ( Stage 1 ) at Zone 1D at Axis 01L-01M (as highlighted)
Surface Preparation and primer Coating for Buttress BOI-BOV-109 & BOI-BOV-110 of Zone 2M , at Axis
Single Layer of 4mm Thick Modified Bituminous WaterProofing Membrane for Buttress BOI-BOV-109 & B
Protection Layer of 4mm thick Bituminous Protection Board for Buttress BOI-BOV-109 & BOI-BOV-110 o
Surface Preparation and Primer coating for MCPE 1 Walls and counterfort at Zone 2M 2N , (as highlight
Two Layers of 4mm thick Modified Bituminous WaterProofing Membrane for MCPE 1 Walls and Counterfo
Surface Preparation and Primer coating for MCPE 1 Duct Tunnel Wall at Zone 2M 2N , Axis 03R , 03S & 0
Two Layers of 4mm thick Modified Bituminous WaterProofing Membrane for MCPE 1 Duct Tunnel Wall at
Protection Layer of 4mm thick Bituminous Protection Board for MCPE 1 Duct Tunnel Wall at Zone 2M 2N
Steel Reinforcement for Large Mosque Lower Second Floor wall ( W3 ) for, Zone 1G Axis ( 5-6 / E-D ) (As
Steel Reinforcement for Large Mosque Upper Second Floor Columns (C4 & C2A )for, Zone 1G Axis ( 2-5 /
Steel Reinforcements for Infill wall ( inner ) ( Stage 2 ) at Zone 1D at Axis 01K-01L (as highlighted)
Marking and Excavation for Tree Pits (17 no's) Inside Boat Garden, At Water Garden, at highlighted
Concrete Pouring & shuttering for Fountain 2 (Inner) (2 nos) Inside Physic Garden as highlighted area
Excavation and Blinding Levels for Low Current Handholes (MH/PG/LC/21) and Fire Alarm & Security (
Excavation and Blinding Levels for Electrical Handholes of Emergency (MH/PG/EM/16) and Low Voltag
Excavation for Low Current Lines (MH/WG/LC/12 to 15), Fire Alarm & Security (MH/WG/FA/19 to 22),
Excavation for Electrical Lines of Emergency (MH/WG/EM/18 to 21) & Low Voltage (MH/WG/LV/39 to 40
Concrete Pouring for Blinding under Low Current Handholes of ICT (TG/T/LC-01) and Fire Alarm & Secur
Concrete Pouring for Blinding under Electrical Handholes of Emergency (TG/E/LV-01) and Low Voltage (
Excavation and Blinding Levels for Low Current Handholes of ICT (TG/T/LC-01) and Fire Alarm & Securi
Excavation and Blinding Levels for Electrical Handholes of Emergency (TG/E/LV-01) and Low Voltage (T
Inspection of Excavation for Tree Pit (125No's) as Details D-38-1 at Car Parking-J - as highlighted
Inspection of Formwork and Concrete Pouring for MV Line Pit - C/MV/10, C/MV/25, H/MV/27 at Zone-
Inspection of Blinding Concrete under MV Line Pit - C/MV/10 at Zone-C - as highlighted (KAIG3-SCR-SW
Surface Preparation prior to start Water Proofing and WaterProofing for MV Line Pit L/MV/11, L/MV/14
Inspection of Blinding Concrete under Heating and Chilled Water Line Pit B/DC/04, H/DC/37, H/DC/38,
Surface Preparation prior to start backfilling around Fire Water Line Pit for B/F/02 - as highlighted.
Surface Preparation prior to start backfilling around Potable Water Line Pit for B/PW/10 - as highlighted.
Surface Preparation prior to start backfilling for MV Line Pit B/MV/02 at Zone- B (As Highlighted)
Surface Preparation prior to start backfilling for Non potable water line Pit POC-04 at Zone-B - As Highli
Inspection and Compaction test backfilling Sub-grade 3rd Layer (3 of 8) for MV Line Pit G/MV/04 at Zone
Inspection and Compaction test for backfilling Sub-grade 6th Layer (6 of 20) for SBC-07 Expansion joint
Inspection and Compaction test for backfillig Sub-grade 8th Layer (8 of 11) for Heating and Chilled Wate
Inspection and Compaction test for backfilling Sub-grade 3rd Layer (3 of 10) for wing wall of SBC-04 - As
Surface Preparation prior to start backfilling for wing wall of SBC-03 - As Highlighted
Inspection and Compaction test for Sub-base 1st Layer (1 of 2) for Car Park-H (CPH5 - ST.0+010 to 0+120
Inspection for application of 1Coat Primer, Damp Proof (1st Coat & 2nd Coat) and Protection Board for
Inspection and Compaction test for backfilling Sub-grade 3rd Layer (3 of 4) for MV Line Pit D/MV/31,
Inspection of Sand bedding under pipe for MV Line between C/MV/15 and C/MV/21 at Zone-C - as high
Inspection of Sand bedding under pipe for LV Line from D/LV/08 to E/LV/02 at Zone-D&E - as highlighted
Inspection of Sand bedding under pipe for Fire & Security Distribution Line from D/FS/11 to E/FS/02 at
Inspection of Sand bedding under pipe for Telecommunication Line from D/TL/07 to E/TL/02 at Zone-D
Pipe Installation of Trees Sub-Surface Drainage (Main Line & Branches) Pipes; ( Perforated110 mmØ
'Bedding of Gravel 3/8" and Geotextile Surrounding Pipe Installation of Trees Sub-Surface Drainage
Pre insulated Chilled water Pipes (S&R) 150mmØ (laying ,Aligment ,Leveling and fit up) (E:647341.89
Pre insulated Chilled water Pipes (S&R) ( laying ,Aligment ,Leveling and fit up) 200mmØ (E:647
Sand Cover & Pipes Protection (30 cm above Pipes) For Pre-insulated Chilled Water Pipes (dia 10
Steel Reinforcement & Shuttering for Lintels and Stiffener Columns of Block work & Doors for Walls
Inspection of Plastering for wall (Both sides) at Grid 1, Inside Site Tower 2, as per the highlighted at
Inspection for Installed Low current Handholes of (MH/WG/LC/12) and Fire Alarm & Security (MH/WG/
Inspection for Installed Electrical Handholes of Emergency (MH/WG/EM/18) and Low Voltage (MH/WG/L
Inspection of 1st layer Gravel Backfilling (50cm ht) for Sub Surface Drainage Pipes (dia 110 mm PP) (f
Steel Reinforcement for Dome of New Ticketing Booth # 4A, As per Attached Highlighted Drawing's.
Concrete Pouring for Blinding under Foundations of Internal Garden, Inside Aviary Garden, As per Hig
Stack Boulders Installed Layers at levels +874.40, 874.80, 875.20, 875.60, 876.00 & 876.40, along Op
Installation of direct buried UPVC conduit Low Voltage Ductbank in between Manhole (5x75mm -
Installation of direct buried UPVC conduit (dia.75mm) Low Voltage Ductbank (Emergency) in betw
Installation of straight UPVC Conduit (Dia. 32mm) for Power (CAM-153) at Boundary Wall Column be
Installation of UPVC conduit (2x110mm) Low Current Ductbank (TELECOM) in between Manholes (2x110
Installation of UPVC conduit (2x110mm) Low Current Ductbank (Fire & Security) in between Manholes (
Installed Aluminum Caps between Axis 02/AG - 02/AH.
Installed Aluminum Caps between Axis 02/AG - 02/AH.
Inspection for Installation of Stone Cladding without Copping for Seating Area 3 - 19 at Zone-G (As Highl
Inspection and Compaction Test for backfilling Sub-grade 6th Layer (6 of 6) above Sand Covering for Pot
Inspection and Compaction Test for backfilling Sub-grade 6th Layer (6 of 6) above Sand Covering for Fir
Inspection and Compaction test for backfillig Sub-grade 7th Layer (7 of 11) for Heating and Chilled Wate
"Inspection of Excavation for MV Line from G/MV/23 to G/MV/32 and G/MV/38 to G/MV/11 at Zone-G i
Inspection of Excavation for LV Line from B/LV/44 to B/LV/28 at Zone-B including Pit - B/LV/45, B/LV/28
Inspection of Excavation for LV Line from B/LV/19 to B/LV/18 at Zone-B including Pit - B/LV/19, B/LV/18
Surface Preparation prior to start backfilling for MV Line Pit G/MV/05, G/MV/16, G/MV/17 at Zone- G (A
Inspection and Compaction test for backfilling Sub-grade 5th Layer (5 of 20) for SBC-07 Expansion joint
Inspection and Compaction test for backfilling Sub-grade 6th Layer (6 of 7) for Non potable water line
Inspection and Compaction test for backfilling Sub-grade 4th Layer (4 of 5) above sand for Non potable
Inspection of Steel Reinforcement for Slab of Cesspool-1 at Zone-K - as highlighted
Surface Preparation prior to start backfilling for MV Line Pit D/MV/04, D/MV/32 at Zone- D (As Highligh
Inspection of Water Proofing for MV Line Pit D/MV/04, D/MV/32 at Zone- D (As Highlighted)
Inspection of Excavation for MV Line between C/MV/15 and C/MV/21 at Zone-C - as highlighted
Stack Boulders Installed Layers at levels +874.40, 874.80, 875.20, 875.60, 876.00, 876.40, 876.80, 8
Installation of Main Fire Water Pipes (250,200,160&110mmØ-UPVC-Class-5)From Point (648146.439 E
Installation of Main Potable Water Pipes (110,65,50&32 mmØ-UPVC-Class-5) at Crescent - From Poin
1st Layer of Block Work for Large Mosque ,Ground Floor at axis 5-6/D-F at Zone 1G (as highlighted)
Block Works Laying for Large Mosque,Ground Floor Axis 1-2/C-F at Zone 1G Upto Bottom of Lintel Be
Block Works Laying for Large Mosque,Ground Floor Axis 5-6/C-F at Zone 1G Upto Bottom of Lintel Beam
Sand bedding for Pre Insulated Chilled Water Pipes of ( 100mm dia & 150mm dia ) for Child Care at Zon
Inspection and compaction test 2nd and 3rd layer for Backfilling at MCPE 2 wall inner axis 02AA-03E (
'Potable Water Pipes Sand Cover & Pipes Protection (30 cm above Pipes). As per highlighted Area in
'Potable Water Pipes Sand Cover & Pipes Protection (30 cm above Pipes). As per highlighted Area in
Inspection and compaction test 3rd &4th layer for Backfilling around PC 125 Zone 2E (as highlighted) ax
Inspection and compaction test 7th layer for backfilling for TUNNEL 2(between axis 02-T & 02-S) zone 2
Surface Preparation Prior to start Backfilling for retianing wall Axis 01/AA-01/AH, Zone 1J 1K (as highligh
'Fire Fighting Networks Sand Cover & Pipes Protection (30 cm above Pipes). As per highlighted Area
Inspection and compaction test 5th &6th layer for Backfilling around PC 125 Zone 2E (as highlighted) ax
'Fire Fighting Networks Sand Cover & Pipes Protection (30 cm above Pipes). As per highlighted Area
Inspection and compaction test 10th layer Backfill for MCPE 3 Inner wall Axis 03A to 02S (as highlighted
Inspection and compaction test 1st & 2nd layer for Backfilling at MCPE 3 Axis 02P to 02S Zone 2E (as
Inspection and Compaction test of 4th and 5th Layer of SubGrade backfilling for Strip footing ( Outer )
Steel reinforcements for Child Care Wall ( W2 ) at Zone 2N (As Highlighted)
Shuttering for Retaining wall from Axis 01S-01W , Zone 2&3 ,at Level 868.90 (as highlighted)
Concreting for Retaining wall from Axis 01S-01W , Zone 2&3 ,at Level 868.90 (as highlighted)
Shuttering for Blinding under Retaining wall Foundation from Axis 01W-01Y , Zone 1H ,at Level 865.0 &
Concreting for Blinding under Retaining wall Foundation from Axis 01W-01Y , Zone 1H ,at Level 865.0 &
Concreting for Infill wall (outer ) at Zone 2A at Axis 02B-02C (As Highlighted) level from 863.55 to 869.1
Surface Preparation and primer coating for diaphragm wall for Foundations and wall at zone 2M axis 0
Single Layer of 4 mm thick Modified Bituminous WaterProofing Membrane for diaphragm wall for Foun
Protection Layer of 4mm thick Bituminous Protection Board for diaphragm wall for Foundations and wal
Shuttering for Diaphragm wall ( Inclined ) at Zone 1E Axis 01P (As Highlighted) Level 868.50
Level and Location for Retaining wall from Axis 01S-01W , Zone 2&3 ,at Level 868.90 (as highlighted)
Level and Location for Blinding under Retaining wall Foundation from Axis 01W-01Y , Zone 1H ,at Level
Level and Location for Diaphragm wall ( Inclined ) at Zone 1E Axis 01P (As Highlighted) Level 868.50
Sand Bedding for Low Current Lines (MH/PG/LC/01-02) and Fire Alarm & Security (MH/PG/FA/07-06-05)
Sand Bedding for Electrical Lines of Emergency (MH/PG/EM/1-2 & 9-10) and Low Voltage (MH/PG/LV/1-2
Coordinates & Levels of Blinding under Foundations of Internal Garden, Inside Aviary Garden, As per
2nd Coat Cementitiuos water proofing for Wall (Outer Face) of Boundary wall @ Grid (12-23/Right Side
1st Coat Cementitiuos water proofing for Wall (Outer Face) of Boundary wall @ Grid (12-23/Right Side
Surface preparation prior to Cementitiuos water proofing & Stone Cladding for Wall (Outer Face) of B
Plastering for all walls (All sides), at 1st & 2nd Floors Inside Site Tower 2, as per the highlighted atta
Inspection of Block work upto Lintel Height (9 Layers) for Walls of Toilets & Meeting Room, at Grid (1
Single layer 4mm thick modified bituminous waterproofing membrane for External Surfaces of Wet Well
Solvent Base Primer Coating prior to Membrane Water proofing for External Surfaces of Wet Well E (Al
Single layer 4mm thick modified bituminous waterproofing membrane for External Surfaces of Wet Well
Solvent Base Primer Coating prior to Membrane Water proofing for External Surfaces of Wet Well F (Al
Steel Reinforcement for Walls of Cabin Room, ETFE Pump Room & Remaining Boundary wall, at Butterf
Installation of straight PVC Conduit (Dia. 25mm) and boxes for Lighting System (LED CT/CE, CD/CE, D3
Installation of straight UPVC Conduit (Dia. 160mm) Low Voltage Ductbank (B/LV/24 to B/LV/44), Duct
Installation of straight UPVC Conduit (Dia. 160mm) Medium Voltage Ductbank no. CC/D-MV/37 (C/MV/
Installation of straight UPVC Conduit (Dia. 160mm) Low Voltage Ductbank no. GG/D-LV/64 (G/LV/20 t
Surface preparation for backfilling between duct tunnel Shaft of MCPE 1 and Buttress Bo 109 , Zone 2M
Inspection and Compaction test for 1st and 2nd layer of Gravel backfilling around TUNNEL 1 Shaft at Zo
Inspection and Compaction test for 2nd layer backfilling between duct tunnel wall of MCPE 3 and Buttr
Inspection and Compaction test for 3rd layer of Back filling in Energy Center, Axis 15-20/N-Q (As Highlig
Inspection and Compaction Test for 8th layer Backfilling for Energy Center 2 (As Highlighted) Zone 5A A
Excavation & Bed Preparation for Low Current Lines (MH/PG/LC/01-02) and Fire Alarm & Security (MH
Steel Reinforcements for Stiffner of Buttress BII-9 ( Inner ( 1no ) ) and BOV- 9 & BOV-10 ( Outer ( 2 no
Excavation & Bed Preparation for Electrical Lines of Emergency (MH/PG/EM/1-2 & 9-10) and Low Volt
Steel Reinforcements for Stiffner of Buttress BII-112 ( Inner ( 1no ) ), at Zone 1C Axis 01J ( As Highlihted
Surface Preparation and primer coating for diaphragm wall ( Vertical Wall ) at zone 4 , Axis 01P (As Hi
Coordinates & Levels of Blinding under Foundation of Water Feature Pump Room, at Butterfly Garden,
Single Layer of 4mm thick Modified Bituminous Water Proofing Membrane for diaphragm wall Rc footing(
Cooncrete Pouring for Blinding under Foundation of Water Feature Pump Room, at Butterfly Garden, a
Single layer 4mm thick modified bituminous waterproofing membrane and Protection layer for Footin
Surface Preparation and Primer Coating for diaphragm wall Rc footing( Top & Side ) at Zone 4 , Axis 01P
Steel reinforcements for MCPE 2 wall and counter fort at zone 2H Between axis 02AA to 02AB TOC 875.8
Surface Preparation and Solvent Base Primer Coating Waterproofing for Footing of Boundary Wall at
Shuttering for MCPE 2 Wall and Counter fort from 871.00 - 875.55 from axis 02AE to 02AF zone 2K (as h
Concreting for MCPE 2 Wall and Counter fort from 871.00 - 875.55 from axis 02AE to 02AF zone 2K (as h
Single Layer of 4mm thick Modified Bituminous WaterProofing Membrane for diaphragm wall ( Vertical W
Two Layers of 4mm thick Modified Bituminous WaterProofing Membrane for Retaining Wall Foundation
Protection Layer of 4mm thick Bituminous Protection Board for Retaining Wall Foundation and Wall ,Fr
Protection Layer of Geotextile and screed for Retaining Wall Foundation and Wall ,From Axis 02E-02F,
Shuttering and Concreting for Beams of Energy Center at Grid 28-30 /M-R (As Highlighted) Level upto 8
Surface Preparation and Primer Coating for retaining Wall Foundation and Wall ,From Axis 02E-02F, Zon
Concreting for MCPE 2 Wall & Counterfort , Axis 02AD-02AE, Zone 2J (As Highlighted )
Pre insulated Chilled water Pipes (S&R) 250mmØ From point (E:648070.637 N:2713830.941) to (E
Filed joint jacketing for pre insulated chilled water pipes (S&R) 200mmØ ,65mmØ from point ( E:647
Inspection of Sand bedding under pipe for Heating Water Line at Zone-H - As highlighted (Stock Pile# 15
Inspection and Compaction test for backfilling Sub-grade 2nd Layer (2 of 10) for wing wall of SBC-04 - A
Inspection and Compaction test for backfilling Sub-grade 2nd Layer (2 of 4) for MV Line Pit D/MV/31,
Inspection and Compaction Test for backfilling Sub-grade 5th Layer (5 of 6) above Sand Covering for Pot
Inspection and Compaction Test for backfilling Sub-grade 5th Layer (5 of 6) above Sand Covering for Fir
Installation of direct buried UPVC conduit (dia.75mm) Low Voltage Ductbank (Emergency) in bet
Level and Location for strip foundation of retaining block wall strip footing Zone 2R North Admin buil
Installation of Cable Trunk (Lighting & Small Power - 100mm) at the Management and Maintenance Build
Level and Location for MCPE 2 Wall and Counter fort from 871.00 - 875.55 from axis 02AE to 02AF zone
Installation of Cable Tray (Emergency - 225mm,200mm & 100mm) at the Management and Maintenance Bui
Level and Location for Beams of Energy Center at Grid 28-30 /M-R (As Highlighted) Level upto 878.50
Installation of Cable Tray for Low Current (TELECOM /ICT : 100mm) at Management and Maintenance Bl
Installation of Cable Tray for Low Current (Fire Alarm : 100mm) at Management and Maintenance Bldg.
Level and Location for MCPE 2 Wall and Counter fort from 871.00 - 875.55 from axis 02AF to 02AG zone
Installation of PVC conduit (110mm dia.-sleeve) for Low Current ( 4pcs.-ICTcables, 2pcs. Fire & Securi
Installation of direct buried UPVC conduit 32mm (stub-up & straight) for Lighting at the Discovery Gard
Installed Aluminum Caps between Axis 02/R - 02/S.
Installed Aluminum Caps between Axis 02/S - 02/T.
Installed Aluminum Caps between Axis 02/T - 02/U.
Installed Aluminum Caps between Axis 02/U - 02/V.
1st & 2nd layer of 4mm thick modified bituminouswaterproofing membrane under retaining wall foun
Protection layer of 4mm thick bituminous protection board under retaining wall foundation from axis
Concreting for Devonian gardens Wall (as highlighted) Zone 2M axis 03U upto 874.50
Steel reinforcements for Devonian garden wall (3rd) Zone 2M Axis 02AN-02AO (as highlighted) TOC 874
Steel reinforcements for Devonian garden AHU RC foundation (near 2nd) at zone 2M axis 02AM-02AL (as
Steel reinforcements for MCPE 2 Roof slab at zone 2H Between axis 02Z to 02AA TOC 875.85 (as highlig
Shuttering for MCPE 2 Roof slab at zone 2H Between axis 02Z to 02AA TOC 875.85 (as highlighted)
Concrteting for MCPE 2 Roof slab at zone 2H Between axis 02Z to 02AA TOC 875.85 (as highlighted)
Steel reinforcements for Roof Slab of North Administration Building , Zone 2R , Axis 02BC-02AZ ( As Hig
Shuttering for Roof Slab of North Administration Building , Zone 2R , Axis 02BC-02AZ ( As Highlighted )
Shuttering for Infill wall (Outer ) ( Stage 2 ) at Zone 2B at Axis 02D-02E (as highlighted)
Concreting for Infill wall (Outer ) ( Stage 2 ) at Zone 2B at Axis 02D-02E (as highlighted)
Shuttering for Lower Second Slab Upstand (UB 3 ) at Large Mosque at Zone 1G Axis ( 5-6 / C-F ) (As Hig
Steel Reinforcements for RC Foundation at Zone 1M at Axis 01AJ-01AK and 01AL-01AM (as highlighted)
Concreting for RC Foundation at Zone 1M at Axis 01AJ-01AK and 01AL-01AM (as highlighted)
Shuttering for RC Foundation at Zone 1M at Axis 01AJ-01AK and 01AL-01AM (as highlighted)
Shuttering for Diaphragm wall for Foundation and Strip footing at Zone 2C , Axis 02J (As Highlighted) 8
Shuttering & Concreting for Energy Center for Wall ( W4 ) at Grid 0-1, C-I from Level 877.00 to 882.30 (A
Concreting for Diaphragm wall for Foundation and Strip footing at Zone 2C , Axis 02J (As Highlighted)
Shuttering for Devonian gardens Wall (as highlighted) Zone 2M axis 03U upto 864.50
Concreting for Large Mosque for ( Upper second Floor ) for Two Columns and Wall ,Column ( C 1A ) Wal
Inspection Of Pipe Installation For Non-Potable Water (Irrigation Main Line); (200 mmØ- UPVC-Class-
Inspection Of Pipe Installation For Non-Potable Water (Irrigation Main Line); (200 mmØ- UPVC-Class-
Inspection Of Pipe Installation For Non-Potable Water (Irrigation Main Line); (200 mmØ- UPVC-Class-
Pipe Installation of Trees Sub-Surface Drainage (Main Line & Branches) Pipes; ( Perforated110 mmØ
'Bedding of Gravel 3/8" and Geotextile Surrounding Pipe Installation of Trees Sub-Surface Drainage
Antitermite under Mass concrete (1st Layer ) at Energy Center ( Mechanical ) at Axis 20/N-Q (As Highligh
Surface Preparation prior to start backfilling around TUNNEL 1 Shaft at Zone 1C (as highlighted) Axis 01
Indpection and Compaction test for 1st layer of 4th layer backfilling between duct tunnel wall of MCPE
Inspection and Compaction test for 2nd layer of Back filling in Energy Center, Axis 15-20/N-Q (As Highlig
Inspection and Compaction test of 3rd layer of Back filling of SubGrade for ( 1st ) AHU Unit Room of D
Surface preparation prior start backfilling for Internal Building at Zone 2C Axis 02G to 02J (As highlighted
Inspection and Compaction test of 1st and 2nd Layer of Backfilling Subgrade for Draniage Pipe at Juras
Inspection and Compaction Test for 7th layer Backfilling for Energy Center 2 (As Highlighted) Zone 5A A
Surface Preparation prior to start backfilling for MCPE 1 duct tunnel wall and Buttress outer 110 (as h
Mechanical Pipe Sleeve Installation For Rain Water Drainage, For First Floor Roof at Large Mosque,
"Inspection of Formwork and Concrete Pouring for Wall of MV Line Pulling Pit C/MV/08, C/MV/09, C/
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 10) for wing wall of SBC-04 - As
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 4) for MV Line Pit D/MV/31,
Inspection and Compaction Test for backfilling Sub-grade 4th Layer (4 of 4) above Sand Covering for Pot
Inspection and Compaction Test for backfilling Sub-grade 4th Layer (4 of 4) above Sand Covering for Fir
Inspection and Compaction test for backfillig Sub-grade 5th Layer (5 of 6) for Heating and Chilled Water
Inspection of Excavation for LV Line from D/LV/08 to E/LV/02 at Zone-D&E including Pit - D/LV/09, E/LV/
Shuttering for Mass concrete (1st Layer ) at Energy Center ( Mechanical ) at Axis 20/N-Q (As Highlighted)
Concreting for Mass concrete (1st Layer ) at Energy Center ( Mechanical ) at Axis 20/N-Q (As Highlighted
Shuttering for Mass concrete (2nd Layer )at Energy Center ( Mechanical ) at Axis 25/O-Q , 26/O-Q , 27
Concreting for Mass concrete (2nd Layer )at Energy Center ( Mechanical ) at Axis 25/O-Q , 26/O-Q , 27
Steel Reinforcements for Diaphragm wall for Foundation and Strip footing at Zone 2C , Axis 02J (As Hig
Shuttering for MCPE 2 Wall and Counter fort from 871.00 - 875.85 from axis 02AF to 02AG zone 2K (as h
Concreting for MCPE 2 Wall and Counter fort from 871.00 - 875.85 from axis 02AF to 02AG zone 2K (as h
Steel Reinforcements for Beams of Energy Center at Grid 28-30 /M-R (As Highlighted) Level upto 878.50
Shuttering and concreting for Energy Center, Beam at Grid 17-28/M at level 878.50 (As Highlighted)
Shuttering for Kicker of Retaining wall from Axis 01S-01W , Zone 2&3 (as highlighted)
Concreting for Kicker of Retaining wall from Axis 01S-01W , Zone 2&3 (as highlighted)
Shuttering for Large Mosque Lower Second Floor Slab for Zone 1G Axis ( 1-2 / D-F ) (As Highlighted) Upt
Shuttering for Infill wall at Zone 2M at Axis 02AO (as highlighted)
Concreting for Infill wall at Zone 2M at Axis 02AO (as highlighted)
Protection Layer of 4mm thick Bituminous Protection Board for Buttreess BOI-BOV- 79 , BOI-BOV 80 and
Steel Reinforcement for Large Mosque Lower Second Floor ( Slab and UB3 ) for, Zone 1G Axis ( 1-2 / D-F
Steel Reinforcements for Beam of Diaphragm wall ( 3rd Span ) at Zone 1E , Axis 01P (As Highlighted)
Shuttering for Beam of Diaphragm wall ( 3rd Span ) at Zone 1E , Axis 01P (As Highlighted)
Concreting for Beam of Diaphragm wall ( 3rd Span ) at Zone 1E , Axis 01P (As Highlighted)
Steel Reinforcements for Columns of Energy Center at Grid 7-14/L (24 nos) (As Highlighted) Level upto
Inspection of Plastering Work ( inner side ) for ETFE Pump Room no # 6113 ( Ground Floor ) at Zone 2G,
Excavation for Fire & Security Distribution Line from D/FS/11 to E/FS/02 at Zone D&E Including Pit E/FS
Inspection of Plaster Guide Point and Plaster Accessories for Pump Room 6089 at Zone 1C axis 01I (as h
Excavation for Telecommunication Line from D/TL/07 to E/TL/02 at Zone-D&E Including Pit E/TL/01, E/TL
Level and Location for Lower Second Slab Upstand (UB 3 ) at Large Mosque at Zone 1G Axis ( 5-6 / C-F )
Level and Location for Blinding under Foundation of Retaining wall at axis 02C Zone 6 & 7 (as highlighte
Level and Location for MCPE 2 Roof slab at zone 2H Between axis 02Z to 02AA TOC 875.85 (as highlighte
Inspection of Excavation for Heating and Chilled Water Line at Zone-L including Pit H/DC/37, H/DC/38,
Level and Location for Roof Slab of North Administration Building , Zone 2R , Axis 02BC-02AZ ( As Highl
Level and Location for Infill wall (Outer ) ( Stage 2 ) at Zone 2B at Axis 02D-02E (as highlighted)
Level and Location for RC Foundation at Zone 1M at Axis 01AJ-01AK and 01AL-01AM (as highlighted)
Inspection of Excavation and removal of disposal material upto rock layer for Car Park -F @ Zone-B&G -
Inspection and Compaction test for backfilling Sub-grade 3rd Layer (3 of 20) for SBC-07 Expansion joint
Inspection and Compaction test backfilling Sub-grade 2nd Layer (2 of 8) for MV Line Pit G/MV/04 at Zone
Level and Location for Diaphragm wall for Foundation and Strip footing at Zone 2C , Axis 02J (As Highl
Level and Location for Energy Center for Wall ( W4 ) at Grid 0-1, C-I from Level 877.00 to 882.30 (As High
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 2) beside LV Line from G/LV/18
Inspection and Compaction test for backfilling Sub-grade 4th Layer (4 of 10) for above SBC-07 - as highl
Inspection and Compaction test for backfilling Sub-grade 4th Layer (4 of 7) for Non potable water line
Inspectionand Compaction test for backfilling Sub-grade 2nd Layer (2 of 5) above sand for Non potable
Inspection of Sand bedding under pipe for Fire & Security Distribution Line At Zone D - as highlighted (S
Inspection of Sand bedding under pipe for Telecommunication Line at Zone-D - as highlighted (Stock Pi
"Inspection of Formwork And Concrete Pouring For Footing of Sub-station - R1 at Zone-C - as highlighted
2nd layer 4mm thk Modified Bituminous Water Proofing Membrane for Footing's & Column's (18 no's) (A
Steel Reinfotcmenet for Slab of New Ticketing Booth # 1A, As per Attached Highlighted Drawing's.
Surface Preparation prior to Water proofing for External Surfaces of Wet Well F (All Sides) (upto Leve
Surface Preparation prior to Water proofing for External Surfaces of Wet Well E (All Sides), Inside Wa
Surface Preparation and Repair (with Nitobond AR and HS extra) for Footing of Boundary Wall at Spa
Warning Tiles & Tape on Low Current Lines (MH/WG/LC/04 to 11 to 10), Fire Alarm & Security (MH/WG
Warning Tiles & Tape on Electrical Lines of Emergency (MH/WG/EM/06 to 17 to 16), Inside Geyser Gar
Inspection and Compaction test for backfillig Sub-grade 6th Layer (6 of 6) for Heating and Chilled Water
Inspection and Compaction test for backfilling Sub-grade 4th Layer (4 of 20) for SBC-07 Expansion joint
Inspection and Compaction test for backfilling Sub-grade 5th Layer (5 of 10) for above SBC-07 - as highl
Inspection and Compaction test for backfilling Sub-grade 5th Layer (5 of 7) for Non potable water line
Inspection and Compaction test for backfilling Sub-grade 3rd Layer (3 of 5) above sand for Non potable
Inspection for Installation of Slab for MV Line Pit - G/MV/13, G/MV/38, G/MV/02, G/MV/27, G/MV/
Inspection for Installation of Slab for MV Line Pit - G/MV/05, G/MV/16, G/MV/24, G/MV/15, G/MV/
Inspection and Compaction test for backfilling Sub-grade 4th Layer (4 of 4) for Parking Area CPH-1 @ Zo
Inspection of Blinding Concrete under LV Line Pit - B/LV/15, B/LV/16, B/LV/34, B/LV/35, B/LV/36, B/LV/
Inspection and Compaction test for Sub-base 1st Layer (1 of 2) for Car Park-H (CPH4 - ST.0+020 to 0+140
Inspection of Formwork and Concrete pouring for Slab of MV Line Pulling Pit - C/MV/17, C/MV/44, D
Inspection of Steel Reinforcement for Slab of MV Line Pulling Pit - C/MV/17, C/MV/44, D/MV/05, D/M
Inspection of Formwork and Concrete Pouring for Slab of MV Line Pulling Pit - B/MV/10, G/MV/07, H/
"Inspection of Formwork And Concrete Pouring For Footing of Sub-station - R13 at Zone-F - as highlighte
Level and Location for Mass concrete (1st Layer ) at Energy Center ( Mechanical ) at Axis 20/N-Q (As Hig
Level and Location for Mass concrete (2nd Layer )at Energy Center ( Mechanical ) at Axis 25, O-Q , 26,
Level and Location for Infill wall at Zone 2M at Axis 02AO (as highlighted)
Level and Location for Kicker of Retaining wall from Axis 01S-01W , Zone 2&3 (as highlighted)
Level and Location for Large Mosque Lower Second Floor Slab for , Zone 1G , Axis ( 1-2 / D-F ) (As Highl
Level and Location for Devonian gardens Wall (as highlighted) Zone 2M axis 03U upto 864.50
Level and Location for Beam of Diaphragm wall ( 3rd Span ) at Zone 1E , Axis 01P (As Highlighted)
Level and Location for Infill wall (outer ) at Zone 2A at Axis 02B-02C (As Highlighted) level from 863.55
Level and Location for Blinding under footing of Energy Center, Axis 13-16/ L-R Highlighted)
Installation of straight UPVC Conduit (Dia. 160mm) Medium Voltage Ductbank no. CC/D-MV/30 (C/
Installation of PVC Conduit (Dia.25mm) & Boxes for Voice and Data (Data Outlet for Door Controller)
Steel Reinforcment for Large Mosque for ( Lower Second Floor ) for Slab &Beams Zone 1G (As Highligh
Antitermite under Mass concrete (1st Layer ) at Energy Center ( Mechanical ) at Axis 29/N , 29/Q (As Hig
Shuttering for Large Mosque for ( Lower Second Floor ) for Slab & Beams Zone 1G (As Highlighted) Upt
Shuttering for Large Mosque for ( Upper second Floor ) for Two Columns and Wall ,Column ( C 1A ) Wal
Steel Reinforcement for Large Mosque Parapet for Zone 1G Axis ( 5-6 / C-F ) (As Highlighted) Upto Lev
Shuttering for Mass concrete (2nd Layer )at Energy Center ( Mechanical ) at Axis 19/P , 21-24/P , 23-24/
Concreting of Mass concrete (2nd Layer )at Energy Center ( Mechanical ) at Axis 19/P , 21-24/P , 23-24/
Shuttering for Mass concrete (1st Layer ) at Energy Center ( Mechanical ) at Axis 29/N , 29/Q (As Highlig
Concreting of Mass concrete (1st Layer ) at Energy Center ( Mechanical ) at Axis 29/N , 29/O (As Highligh
Steel Reinforcements for Kicker and wall of Retaining wall from Axis 01S-01W , Zone 2&3 (as highlighte
Pipe Installation of Sub-Surface Drainage (Main Line & Branches) Pipes; ( Perforated110 mmØ, ) at B
'Bedding of Gravel 3/8" and Geotextile Surrounding Pipe Installation of Sub-Surface Drainage (Main
Installed Base Extrusion and Base Seal between Axis 02/AG - 02/AH.
'Pipe Installation For Water Feature Pipes (160mm, 110mm & 63mm UPVC CLASS 5), at Management B
Installation of Puddle Flange Pipes; (315mmØ UPVC CLASS 5) ; For Decant Sump at Water Gardens (
Field joint jacketing for Pre insulated Chilled Water Pipes (S&R) 200mmØ From point (E:647687.914
Mechanical Pipe sleeve Installation ,(CHW S&R) From Axis (02/2A to 02/AF) At Crescent 2 MCPE2; (
Screed protection with Geo Textile on Blinding of Mechanical Room, at Grid (F-H/10-11), at Manage
Inspection & Compaction tests of Single Layer (Sub-Base) Backfilling for Low Current Lines (MH/WG/L
Inspection & Compaction tests of Single Layer (Sub-Base) Backfilling for Electrical Lines of Emergen
Excavation and Surface preparation for Foundation of Water Feature Pump Room, at Butterfly Garden,
Steel Reinforcement for Wall of Decant Sump-D4 Inside Water Play garden, at Water Garden as highli
Inspection for Installed Low Current Handholes (MH/PG/LC/18 & 19) and Fire Alarm & Security (MH/PG
Inspection for Installed Electrical Handholes of Emergency (MH/PG/EM/09, 14 & 15) and Low Voltage
Level and Location for Mass concrete ( 2nd Layer ) at Energy Center ( Mechanical ) at Axis 24/N-O , 25/
Level and Location for Rc Foundations ( P11 , P11 , P12 ) , Axis 02AY-02AZ , 02 (1-2 ) ,Zone 2Q (As Highl
Level and Location for Cafeteria (undercroft) Wall (W19) , Zone 2A Axis 02C-02D (As Highlighted ) Le
Level and Location for Cafeteria (undercroft) Wall (W5 ,W7) , Zone 2A Axis 02A-02B , (As Highlighted
Level and Location for wall (w4) at cafeteria undercroft zone 2A (as highlighted)
Surface Preparation prior for Blinding for Energy Center , Zone 5A , Axis 13-16 / L-R (As Highlighted)
Inspection and Compaction test of 6th Layer of SubGrade backfilling for Strip footing ( Outer ) , Zon 1L ,
Inspection and Compaction test for 1st layer of Back filling in Energy Center, Axis 15-20/N-Q (As Highligh
Surface preparation for continuation of backfilling between duct tunnel wall of MCPE 3 and Buttress o
Inspection and Compaction Test for 2nd Layer of Subgrade Backfilling above Rc Foundation Abutment Bri
Shuttering and concreting for Blinding under footing of Energy Center, Axis 13-16/ L-R Highlighted)
Installation of UPVC conduit (dia.32mm) and Box for Lighting at the Crescent - 01 (Large Mosque) as pe
"Inspection for Installation of MV Line Junction Pit - B/MV/07, G/MV/16- as highlighted "
Inspection of Formwork and Concrete pouring for Footing of MV Line Pit - E/MV/01, E/MV/02 at Zone-E
Inspection of Blinding Concrete under RO Water Line Pit ROW-ISC-10, ROW-ISC-09, ROW-ISC-08, ROW-ISC
Inspection of Excavation for RO Water Line Pit ROW-ISC-10, ROW-ISC-09, ROW-ISC-08, ROW-ISC-07 - As
Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 4) above Sand Covering for Pot
Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 4) above Sand Covering for Fir
Inspection and Compaction test for backfillig Sub-grade 4th Layer (4 of 6) for Heating and Chilled Water
Inspection of Sand bedding under pipe for LV Line at Zone-D - as highlighted (Stock Pile# 159)
Inspection and Compaction test for backfilling Sub-grade 3rd Layer (3 of 10) for above SBC-07 - as highl
Inspection and Compaction test for backfilling Sub-grade 3rd Layer (3 of 7) for Non potable water line
Inspectionand Compaction test for backfilling Sub-grade 1st Layer (1 of 5) above sand for Non potable
Surface preparation prior to start backfilling beside LV Line from G/LV/18 to G/LV/20 at Zone-G - as high
Surface Preparation prior to start backfilling for wing wall of SBC-04 - As Highlighted
Steel Reinforcement for RC Strip Footing ( Outer ) at Zone 1M From Axis 01AJ to 01 AL (As Highlighted)
Shuttering for RC Strip Footing ( Outer ) at Zone 1M From Axis 01AJ to 01 AL (As Highlighted)
Surface preparation prior to start backfilling above Rc Foundation Abutment Bridge at Zone 4 (As highli
Inspection and Compaction Test for 1st Layer of Subgrade Backfilling above Rc Foundation Abutment Brid
Inspection & Compaction tests of Single Layer (Sub-Grade) Backfilling for Irrigation Sub-Main line
Inspection and Compaction test for 1st layer Backfilling to create slope Formation for EPDM Bedding in
Inspection & Compaction tests of Single Layer (Sub-Base) Backfilling for Foundations of Internal Gard
Inspection & Compaction tests of 5th (Final) Layer (Sub-grade) Backfilling along the Boundary Wall (O
Sand Cover and Pipe Protection for Low Current Lines (MH/WG/LC/04 to 11 to 10), Fire Alarm & Secur
Sand Cover and Pipe Protection for Electrical Lines of Emergency (MH/WG/EM/06 to 17 to 16), Inside
Level and Location for Large Mosque for ( Upper second Floor ) for Two Columns and Wall ,Column ( C 1
Level and Location for Diaphragm wall ( Vertical )at zone 1E Axis 01M (As Highlighted) Upto Level 868.5
Level and Location for Large Mosque for ( Lower Second Floor ) for Slab &Beams Zone 1G (As Highligh
Level and Location for Mass concrete ( 2nd Layer ) at Energy Center ( Mechanical ) at Axis 19/P , 21-24/
Level and Location for Mass concrete ( 1st Layer ) at Energy Center ( Mechanical ) at Axis 29/N , 29/Q (A
Level and Location for RC Strip Footing ( Outer ) at Zone 1M From Axis 01AJ to 01 AL (As Highlighted)
Concreting for ( outer ) Infill wall at Zone 1D at Axis 01K-01J ( As Highlighted)
Concreting for South Small Mosque Outer wall ( First Floor ) at Axis D-G, G ( 1-2 ) & G ( 3-4 ), Zone 2
Concreting for blinding of retaining block wall strip footing Zone 2Q North Admin building (KAIG3-SCR-
Steel Reinforcement for RC Strip Footing ( Outer ) at Zone 1M From Axis 01AL to 01 AM (As Highlighted)
Shuttering for RC Strip Footing ( Outer ) at Zone 1M From Axis 01AL to 01 AM (As Highlighted)
Steel reinforcements for Cafeteria (undercroft) Wall (W19) , Zone 2A Axis 02C-02D (As Highlighted )
Inspection of Plaster Guide Point and Plaster Accessories & Rush coat ( Spatter Dash ) of ( Inner ) fo
Inspection of Plaster Guide Point and Plaster Accessories of ( Outer Side ) for ETFE Pump Room 6113 at
Surface Preparation Prior to Start Backfilling in Energy Center, Axis 15-20/N-Q (As Highlighted)
Inspection and Compaction test of 2nd and 3rd Layer of SubGrade backfilling for Strip footing ( Outer )
Excavation & Bed Preparation for Low Current Lines (MH/PG/LC/16-18-19) and Fire Alarm & Security
Inspection and Compaction test of 6th Layer of SubGrade backfilling for Retaining wall at Zone 2C Axis 02
Level and Location for MCPE 2 Wall & Counterfort , Axis 02AD-02AE, Zone 2J (As Highlighted )
Level and Location for RC Strip Footing ( Outer ) at Zone 1M From Axis 01AL to 01 AM (As Highlighted)
Concreting for MCPE 2 Roof Slab , Axis 02Y-02Z, Zone 2H (As Highlighted )
Level and Location for MCPE 2 Roof Slab , Axis 02Y-02Z, Zone 2H (As Highlighted )
Level and Location for Foundation of Retaining wall from Axis 01P-01S , Zone 2&3 (as highlighted)
Level and Location for ( outer ) Infill wall at Zone 1D at Axis 01K-01J ( As Highlighted)
Concreting for Foundation of Retaining wall from Axis 01P-01S , Zone 2&3 (as highlighted)
Concreting for Diaphragm wall Beam at zone 1E Axis 01P (as highlighted)
' Sand Cover & Pipes Protection (30 cm above Pipes) For Pre-insulated Chilled Water Pipes (dia 10
Concreting of Mass concrete (1st Layer ) at Energy Center ( Mechanical ) at Axis 16-19/Q , 25/O-Q , 26-
Concreting for Large Mosque for ( Upper First Floor ) for Beams ( B119, B120, B131, B132, B133, B127,
Steel Reinforcements for Infill wall (outer ) at Zone 2A at Axis 02B-02C (As Highlighted) level from 8
Mechanical Pipe sleeve Installation ,For First floor Roof At North Administration Crescent 2 zone 2
Surface Preparation and Solvent base primer Coating for under strip footing foundation at zone 1M Ax
Single Layer of 4mm thick Modified Bituminous WaterProofing Membrane for under strip footing foun
Protection Layer of Geotextile and screed for under strip footing foundation at zone 1M Axis 01AJ- 01
Mechanical Pipe sleeve Installation ,(RW,WVP&VP) Sleeves From Roof Floor At Crescent 1 (Large M
Shuttering for MCPE 2 Roof Slab , Axis 02Y-02Z, Zone 2H (As Highlighted )
Steel Reinforcement for MCPE 2 Roof Slab , Axis 02Y-02Z, Zone 2H (As Highlighted )
Steel Reinforcements for Foundation of Retaining wall from Axis 01P-01S , Zone 2&3 (as highlighted)
Shuttering for Foundation of Retaining wall from Axis 01P-01S , Zone 2&3 (as highlighted)
Pre insulated Heat Water Pipes (S&R) 200mmØ( laying ,Aligment ,Leveling and fit up) From point
Shuttering for Infill wall (Inner) of Zone 2K at Axis 02AG-02AF ( As Highlighted)
Steel Reinforcements for Devonian gardens Wall (as highlighted) Zone 2M ,
Shuttering for ( outer ) Infill wall at Zone 1D at Axis 01K-01J ( As Highlighted)
Antitermite under Mass concrete (1st ) at Energy Center ( Mechanical ) at Axis 16-19/Q , 25/O-Q , 26-28
Shuttering for Mass concrete (1st Layer )at Energy Center ( Mechanical ) at Axis 16-19/Q , 25/O-Q , 26-
Shuttering for Diaphragm wall Beam at zone 1E Axis 01P (as highlighted)
Shuttering for South Small Mosque Outer wall ( First Floor ) at Axis D-G, G ( 1-2 ) & G ( 3-4 ), Zone 2B
Inspection ans Compaction test for 5th & 6th layer of Backfilling at Zone 1D between PC 23-25 Axis 0
Installation of straight UPVC Conduit (Dia. 160mm) Medium Voltage Ductbank no. CC/D-MV/14 (C/MV/
Installation of straight UPVC Conduit (Dia. 160mm) Medium Voltage Ductbank no. CC/D-MV/37 (C/MV/
Inspection of Copping and Stone Boulder Installation at existing culvert in Wadi-1 and Wadi-2 - As Highl
Inspection for Installation of Stone Cladding without Copping for Seating Area 1- 15 at Zone-L (As Highli
Inspection for Installation of Stone Cladding without Copping for Seating Area 1- 16 at Zone-K (As Highli
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 7) for Non potable water line
"Inspection of backfilling sand 1st Layer (1 of 3) for Non potable water line Pit NPW-ISC-06 at Zone-K -
Inspection of Sand bedding under pipe for Non-Potable Water Line at Zone-G - as highlighted (Stock Pil
Inspection and Compaction test for backfilling Sub-grade 3rd Layer (3 of 4) for Parking Area CPH-1 @ Zo
Inspection for application of 1Coat Primer, Damp Proof (1st Coat & 2nd Coat) and Protection Board for
"Inspection of Sand Covering Layer for Protection of MV Line from C/MV/41 to C/MV/09 and C/MV/01 t
Inspection and Compaction test for backfilling Sub-grade2nd Layer (2 of 10) for above SBC-07 - as highl
Inspection and Compaction test for backfilling Sub-grade 6th Layer (6 of 7) for MV Line Pit F/MV/06 at Z
Inspection of Blinding Concrete under MV Line Pit - C/MV/14, C/MV/35, D/MV/06, H/MV/27 at Zone-C, D
Level and Location for Cafeteria (undercroft) Wall ( W6 ) , Zone 2A Axis 02A-02B (As Highlighted ) Lev
Inspection and Compaction test for backfillig Sub-grade 2nd Layer (2 of 6) for Heating and Chilled Water
Level and Location for Devonian Garden Wall at Zone 2M (As Highlighted) Level upto 874.60
Level and Location for Infill wall (Inner) of Zone 2K at Axis 02AG-02AF ( As Highlighted)
Inspection of Excavation for Heating Water Line at Zone-H including pit G/DH/07 and G/DH/06 - As highl
Inspection and Compaction test for backfillig Sub-grade 1st Layer (1 of 6) for Heating and Chilled Water
Level and Location for Diaphragm wall Beam at zone 1E Axis 01P (as highlighted)
Level and Location of Mass concrete (1st Layer ) at Energy Center ( Mechanical ) at Axis 16-19/Q , 25/O-
Level and Location for South Small Mosque Outer wall ( First Floor ) at Axis D-G, G ( 1-2 ) & G ( 3-4 )
Block Work Laying for ETFE pump room No # 6046 from Lintel Beam to Bottom of Ring Beam at zone 2N
Shuttering for wall (W3 ) at CAFETERIA Zone 2A , Axis 02A-02B (as highlighted) Level from 863.55 to 868
Concreting for wall (W3 ) at CAFETERIA Zone 2A , Axis 02A-02B (as highlighted) Level from 863.55 to 8
1st Layer of Block Work for First Floor at South small mosque , at Zone 2B , Axis D-E/2 , 2-4/D , 5-7/D , D
Shuttering for Infill wall (inner) at Zone 1A at Axis 01A-01B-01C-01D (As Highlighted) level upto 872.00
Concreting for Infill wall (inner) at Zone 1A at Axis 01A-01B-01C-01D (As Highlighted) level upto 872.00
Steel Reiforcement for MCPE 2 wall & counterfort from 02AG-02AH Zone 2K (As Highlighted) From 871.
Steel Reinforcements for Diaphragm wall & Column ( Left Span ) at zone 1N , Axis 01AM (as highlighte
Concrete Pouring & Shuttering for Fountain 2 (Outer) (4 nos) Inside Physic Garden as highlighted area
Steel reinforcements for Staircase ( Step , Riser , Landing ) from ground to 1st Floor of North Administr
Shuttering for Staircase ( Step , Riser , Landing ) from ground to 1st Floor of North Administration Buil
Surface Preparation prior to Waterproofing for Fountain 1 (6 no's), inside Physic Garden as highlighte
Sand Bedding for Low Current Lines (MH/PG/LC/16-18-19) and Fire Alarm & Security (MH/PG/FA/12-13-
Steel Reinforcements for South Small Mosque Staircase ( Step , Riser , Landing ) from ground to 1st Fl
Sand Bedding for Electrical Lines of Emergency (MH/PG/EM/13-14-15) and Low Voltage (MH/PG/LV/12-1
Shuttering for South Small Mosque Staircase ( Step , Riser , Landing ) from ground to 1st Floor, zone 2
Level and Location for Infill wall (inner) at Zone 1A at Axis 01A-01B-01C-01D (As Highlighted) level upto
Concrete Pouring For Blinding Under Electrical Handholes of Emergency (MH/PG/EM/09) and Low Volt
Shuttering for Infill wall (outer ) at Zone 2A at Axis 02B-02C (As Highlighted) level from 863.55 to 869.1
Concrete Pouring For Blinding Under Low current Handholes of (MH/WG/LC/12) and Fire Alarm & Sec
Surface Preparation and Primer Coating for Central Bridge Abutment Rc Footing ( Top and Inner Side ),
Concrete Pouring For Blinding Under Electrical Handholes of Emergency (MH/WG/EM/18) and Low Vol
Two Layers of 4mm thick Modified Bituminous WaterProofing Membrane for Central Bridge Abutment Rc
Level and Location for Staircase ( Step , Riser , Landing ) from ground to 1st Floor of North Administrat
Sand Bedding for Low Current Lines (MH/WG/LC/11 to 12), Fire Alarm & Security (MH/WG/FA/18 to 19)
Level and Location for South Small Mosque Staircase ( Step , Riser , Landing ) from ground to 1st Floor
Sand Bedding for Electrical Lines of Emergency (MH/WG/EM/17 to 18), Inside Geyser Garden, at water
Inspection and Compaction test of 1st Layer of Gravel backfilling for Strip footing ( Outer ), Zone 1L , Ax
Inspection and Compaction test of 1st Layer of SubGrade backfilling for Strip footing ( Outer ) , Zon 1L ,
Inspection and Compaction test of 5th Layer of SubGrade backfilling for Retaining wall at Zone 2C Axis 02
Surface Preparation and primer coating for RC footing ( Top and Side ) of diaphragm wall at Zone 4 , Axi
Single Layer of 4mm thick Modified Bituminous WaterProofing Membrane for RC footing ( Top and Side )
Surface Preparation and primer coating for diaphragm wall ( Vertical Wall Only ) at Zone 4 , Axis 01P (A
Single Layer of 4mm thick Modified Bituminous WaterProofing Membrane for for diaphragm wall ( Vertica
Concreting for RC Strip Footing ( Outer ) at Zone 1M From Axis 01AJ to 01 AL (As Highlighted)
Steel Reinforcements for Infill wall (Outer ) ( Stage 2 ) at Zone 2B at Axis 02D-02E (as highlighted)
Protection Layer of 4mm thick Bituminous Protection Board for (1st) AHU top of Foundation and Wall u
Concreting for Infill wall type (02A) axis ( 01/V to 01/U ) (As highlighted) ZONE 1G
Shuttering for Mass concrete (2nd Layer )at Energy Center ( Mechanical ) at Axis 24/N-O , 25/N (As High
Concreting for Cafeteria (undercroft) Wall ( W6 ) , Zone 2A Axis 02A-02B (As Highlighted ) Level upto
Concreting for Cafeteria (undercroft) Wall (W19) , Zone 2A Axis 02C-02D (As Highlighted ) Level to 86
Concreting for Rc Foundations ( P11 , P11 , P12 ) , Axis 02AY-02AZ , 02 (1-2 ) , Zone 2Q (As Highlighted)
Concreting for Retaining wall (Blinding) Between axis before 01Z to after 01Y at Zone 2 & 3 (As Highlig
Concreting for Devonian Garden Wall at Zone 2M (As Highlighted) upto Level 874.60
Surface Preparation and Primer Coating on Blinding under Foundation of Retaining wall,From Axis 02E-
Two Layers of 4mm thick Modified Bituminous WaterProofing Membrane on Blinding under Foundation o
Protection Layer of 4mm thick Bituminous Protection Board on Blinding under Foundation of Retaining
Shuttering for Cafeteria (undercroft) Wall (W19) , Zone 2A Axis 02C-02D (As Highlighted ) Level to 86
Shuttering for Cafeteria (undercroft) Wall (W5 ,W7) , Zone 2A Axis 02A-02B , (As Highlighted ) Level Up
Concreting for Cafeteria (undercroft) Wall (W5 ,W7) , Zone 2A Axis 02A-02B , (As Highlighted ) Level
Shuttering for wall (W4) at cafeteria undercroft, Zone 2A (as highlighted)
Concreting for wall (W4) at cafeteria undercroft, Zone 2A (as highlighted)
Shuttering for Cafeteria (undercroft) Wall ( W6 ) , Zone 2A Axis 02A-02B (As Highlighted ) Level upto
Surface Preparation and primer Coating for Foundation of Devonian Garden , Zone 2M , Between Axis
Single Layer of 4mm Thick Modified Bituminous WaterProofing Membrane for Foundation of Devonian
Protection Layer of 4mm thick Bituminous Protection Board for Foundation of Devonian Garden , Zone
Shuttering for Devonian Garden Wall at Zone 2M (As Highlighted) upto Level 874.60
Cementitious waterproofing on Blinding under Foundation of Retaining wall, From Axis 02E-02C, Zone 6
Concreting for plain concrete at DEVONIAN GARDEN zone 2M BETWEEN axis 02-AN & 02-AL (as high
Concreting for plain concrete at DEVONIAN GARDEN zone 2M BETWEEN axis 02-AN & 02-AL (as high
Installation of PVC Conduit (Dia.25mm) & Boxes for Fire Alarm (Smoke Detector, Voice Alarm, Remot
Inspection of Formwork and Concrete pouring for Wall of MV Line Pit - D/MV/04, D/MV/32. D/MV/03 &
Surface Preparation prior to start backfilling for Parking Area @ Zone-G - as highlighted
Inspection for application of 1Coat Primer, Damp Proof (1st Coat & 2nd Coat) and Protection Board for
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 4) above Sand Covering for Po
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 4) above Sand Covering for Fir
Inspection and Compaction test for backfillig Sub-grade 3rd Layer (3 of 6) for Heating and Chilled Water
Inspection of Blinding Concrete under LV Line Pit - B/LV/27, B/LV/26, B/LV25, B/LV/44, B/LV/24, B/LV/
Inspection and Compaction test backfilling Sub-grade 1st Layer (1 of 8) for MV Line Pit G/MV/04 at Zone
Inspection and Compaction test for backfilling Sub-grade 2nd Layer (2 of 20) for SBC-07 Expansion joint
Inspection and Compaction test for backfilling Sub-grade 2nd Layer (2 of 7) for Non potable water line
"Inspection of backfilling sand 2nd Layer (2 of 3) for Non potable water line Pit NPW-ISC-06 at Zone-K -
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 20) for SBC-07 Expansion joint
Inspection and Compaction Test for backfilling Sub-grade 1st Laye (1 of 4) above Sand Covering for Fire
Inspection and Compaction Test for backfilling Sub-grade 1st Laye (1 of 4) above Sand Covering for Potb
Inspection and Compaction test for Sub-base 2nd Layer (2 of 2) for Car Park-H (CPH3 - ST.0+020 to 0+140
"Inspection for Installation of MV Line Junction Pit - B/MV/26, G/MV/05, G/MV/17- as highlighted "
Surface Preparation prior to start backfilling for MV Line Pit D/MV/31, D/MV/33, D/MV/03, D/MV/08 at
Inspection of Water Proofing for MV Line Pit D/MV/31, D/MV/33, D/MV/03, D/MV/08 at Zone- D (As Hig
Surface Preparation prior to start backfilling for MV Line Pit G/MV/04 at Zone- G (As Highlighted)
Inspection and Compaction test for backfilling Sub-grade1st Layer (1 of 10) for above SBC-07 - as highli
Surface Preparation prior to start backfilling for Non potable water line Pit NPW-ISC-06, NPW-ISC-07, P
Inspection and Compaction test for backfilling Sub-grade 2nd Layer (2 of 4) for Parking Area CPH-1 @ Zo
Inspection and Compaction test for backfilling Sub-grade 5th Layer (5 of 7) for MV Line Pit F/MV/06 at Z
Steel Reinforcement for MCPE 2 Wall and Counterfort of Zone 2J , Axis 02AB-02AC (As Highlighted ) Lev
Single layer of 4mm thick modified bituminous waterproofing membrane for RC strip footing between
Concreting for Slab on Grade and Concrete Pad for AHU Room of Devonian garden (3rd part) Zone 2M
Concreting for Infill wall (Inner) of Zone 2K at Axis 02AG-02AF ( As Highlighted)
Concreting for Staircase ( Step , Riser , Landing ) from ground to 1st Floor of North Administration Buil
Steel Reinforcements for Diaphragm wall , Columns and Walls ( Right Span ) at zone 1N , Axis 01AM (As
Installation of Rock and Boulder No. WRB-56 - 2nd layer (2 of 6)
Inspection of Steel Reinforcement for Slab of MV Line Pulling Pit - G/MV/07, B/MV/10 at Zone-G,B (As H
Inspection of Steel Reinforcement for Slab of MV Line Pulling Pit - H/MV/24, H/MV/28 at Zone-H (As Hig
Inspection of Excavation for MV Line at Zone-F - as highlighted
"Inspection of Excavation for LV Line at Zone-D including Pit - D/LV/07, D/LV/08 - as highlighted "
Excavation for Fire & Security Distribution Line At Zone D Including Pit D/FS/10, D/FS/11 - as highlighted
Excavation for Telecommunication Line at Zone-D Including Pit D/TL/06, D/TL/07, D/TL/01 - as highligh
"Inspection of Excavation for MV Line Pit C/MV/10, C/MV/25 at Zone-C as highlighted (SCR:KAIG3-SCR
Inspection of Sand bedding under pipe for MV Line form C/MV/14 to C/MV/18 at Zone-C including pit
Inspection of Sand bedding under pipe for MV Line form B/MV22 to B/MV/14 at Zone-B - as highlighted
Inspection and Compaction test for backfilling Sub-grade 4th Layer (4 of 7) for MV Line Pit F/MV/06 at Z
Soil Preparation under Boulder No. WRB-39 after cutting
Inspection and Compaction Test for backfilling Sub-grade 5TH Layer (5 of 5) above Sand for Non potable
Inspection of Excavation for Non-Potable Water Line at Zone-G including Pit NPW-ISC-15 - as highligh
Inspection of Steel Reinforcement for Footing and Wall of Sub-station - R13 at Zone-F - as highlighted
"INSPECTION FOR INSTALLATION OF ALL RINGS (RISER) AND SLAB FOR FW-A-3-3, FW-A-3-4, FW-A-3-5 (A
INSPECTION FOR MANHOLE BASE INSTALLATION AND UPVC PIPE CONNECTION FOR - FW-A-3-3 (As Highli
Inspection of Sand bedding under pipe for for Non-Potable Water Line at Zone-G - as highlighted in the
Inspection and Compaction test for backfilling Sub-grade 3rd Layer (3 of 7) for MV Line Pit F/MV/06 at Z
Inspection and Compaction test for backfilling Sub-grade 6th layer (6 of 6) for Non potable water line
Inspection and Compaction Test for backfilling Sub-grade 4th Layer (4 of 5) above Sand for Non potable
Mechanical Pipe sleeve Installation ,Difram Wall Draine Pipe Sleeves From Axis (01/AM ) At Crescen
Coordinates & Levels of Fountain 2 (Inner) (2 nos) Inside Physic Garden as highlighted area in attache
Steel Reinforcement for Fountain 2 (Inner) (2 nos), Inside Physic Garden as highlighted area in attach
Leak Test for Tank of Wet Well E, Inside Water Garden as highlighted area in attached drawing's.
Gravel (Drainage) & Geo Textile (Filter membrane Terrain 1000) for Planting area's at Center, inside B
Excavation & Surface Preparation for Planting area's at Center, inside Butterfly Garden, as highlighte
Excavation and Surface preparation for Foundations of Internal Garden, Inside Aviary Garden, As per
Excavation and Blinding Levels for Electrical Handholes of Emergency (MH/PG/EM/09) and Low Voltag
Excavation & Blinding Levels for Low current Handholes of (MH/WG/LC/12) and Fire Alarm & Securit
Excavation & Blinding Levels for Electrical Handholes of Emergency (MH/WG/EM/18) and Low Voltage
Excavation for Low Current Lines (MH/WG/LC/11 to 12), Fire Alarm & Security (MH/WG/FA/18 to 19) I
Installed Aluminum Extrusion and Base Seal between Axis 02/AA - 02/AB.
Installed Aluminum Extrusion and Base Seal between Axis 02/Z - 02/AA.
Installed Aluminum Extrusion and Base Seal between Axis 02/Y - 02/Z.
Inspection and Compaction test for 9th layer of Backfilling of SubGrade at Zone 1D between PC 23-25 Ax
Excavation & Bed Preparation for Electrical Lines of Emergency (MH/WG/EM/17 to 18), Inside Geyser
Installed ETFE Cushions in Zone 2G between axis 02-X/02-Y without Aluminum Caps.
Installed ETFE Cushions in Zone 2G between axis 02-W/02-X without Aluminum Caps.
Screed protection with Geo Textile on Blinding of Decant Sump-D2 & D3 at Geyser and Mist Garden, i
Single layer 4mm thick modified bituminous waterproofing membrane on Blinding of Decant Sump-D2
Installed ETFE Cushions in Zone 2G between axis 02-V/02-W without Aluminum Caps.
Inspection of Gravel Backfilling (50cm ht) for Sub Surface Drainage Pipes (dia 110 mm PP) (for Trees)
Grouting for Stone Cladding of Boundary walls (Both faces) @ Span 74 and 75 and Columns C74, C75 an
Level and Location of Plain concrete under Devonian Garden Foundation in Zone 2M Axis 02AL-AM ,02AO
Level and Loction of Blinding under S.O.G of Devonian Garden in Zone 2M Axis 02AM-AP (as highlighted
Installation of PVC Conduit (Dia. 25mm) and boxes for Lighting System (Lighing Switch) at the Cafeter
Level and Location for COLUMNS C2 at Zone 2N Child Care (as highlighted) (C2 -5 nos) Upto bottom of S
Inspection and Compaction test for 3rd Layer backfilling of Pile cap Between ( PC-111,PC-113,PC-115,
Installed Aluminum Caps between Axis 02/AG - 02/AH.
Installed Aluminum Caps between Axis 02/AE - 02/AF.
Installed Aluminum Caps between Axis 02/AF - 02/AG.
Installation of Rock and Boulder No. WRB-56 - 1st layer (1 of 6)
Inspection of Blinding Concrete under Sub-station - R13 at Zone-F - as highlighted
Inspection for Installation of Heating and Chilled Water Line Pit for B/DC/07, at Zone-B - As highlight
Inspection and Compaction test for Sub-base 2nd Layer (2 of 2) for Car Park-H (CPH2 - ST.0+020 to 0+1
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 1) for Parking Area CPH-1 @
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 2) between the MV line D
Inspection of Excavation for Heating and Chilled Water Line at Zone-H - As highlighted
Inspection of Sand bedding under pipe for Non-Potable Water Line at Zone-C - as highlighted (Stcok P
Inspection and Compaction test for backfilling sub-grade 1st layer (1 of 1) above Red Tiles for MV Li
Inspection and Compaction test for backfilling Sub-grade 2nd Layer (2 of 2) for Duct Bank of Fire & Se
Inspection and Compaction test for backfilling Sub-grade 2nd Layer (2 of 2) for Duct Bank of Telecomm
Inspection and Compaction test for backfilling Sub-grade 2nd Layer (2 of 7) for MV Line Pit F/MV/06 at Z
Inspection and Compaction test for backfilling Sub-grade 5th layer (5 of 6) for Non potable water line
Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 5) above Sand for Non potable
Inspection of Sand bedding under pipe for LV Line from B/LV/24 to C/LV/02 at Zone-B - as highlighted (S
Pipe Installation of Trees Sub-Surface Drainage (Main Line & Branches) Pipes; ( Perforated110 mmØ
'Bedding of Gravel 3/8" and Geotextile Surrounding Pipe Installation of Trees Sub-Surface Drainage
'Inspection of Warning Tape for ROW Sub-Mainline (110, 63 & 50mm Ø - uPVC Class 5) as per attach
Installation of straight UPVC Conduit (Dia. 160mm) Low Voltage Ductbank no. BB/D-LV/35 (B/LV/38 t
Installation of straight UPVC Conduit (Dia. 160mm) Low Voltage Ductbank no. BB/D-LV/50 (B/LV/47 t
Surface Preparation Prior to Backfilling under SOG (At bottom of Blinding level of walls) inside Site T
Screed protection with Geo Textile on Blinding of Decant Sump-D1 at Boat garden, inside Water Garde
Single layer 4mm thick modified bituminous waterproofing membrane on Blinding of Decant Sump-D1 a
Inspection of Gravel Backfilling (50cm ht) for Sub Surface Drainage Pipes (dia 110 mm PP) (for Trees
Inspection for Laying of Red Tiles and Warning Tape above the pipe for MV Line from D/MV/36 to D
Steel Reinforcement for Diaphragm Wall Beam at Zone 1E Axis 01P as highlighted.
Concreting for Infill Wall (outer) at Zone 1A at Zxis 01B-01C as highlighted.
Steel Reinforcement for Infill Wall (Inner) at Zone 1A AT Axis 01A-01B asa highlighted level upto 872.
Field Joint Jacketing For Pre insulated Chiled Water Pipes (S&R) 150mmØ & 100mmØ From point (E:
Level and Location for Infill wall at zone 2R axis 02BB to 02BC (BOI 127-128) (AS HIGHLIGHTED)
Pre insulated chilled Water Pipes (S&R) 400mmØ( laying ,Aligment ,Leveling and fit up) From poi
' Pipe Installation of Drainage pipes (110mmØ - UPVC- Class 4) including manhole (FW-A-13-2) . At C
'Bedding of Gravel 3/8" and Geotextile Surrounding Pipe Installation of Drainage pipes (110mmØ - UP
Inspection of First Layer Block Layout for Walls of Toilets & Meeting Room, at Grid (1-4/A-B & 4-5/B-C
Excavation & Bed Preparation for Electrical Lines of Emergency (MH/PG/EM/13-14-15) and Low Voltag
Concrete Pouring & Shuttering for Ring Beams at Entrance of Back of House @ Grid (17-21/Left Side) o
Coordinates & Levels for Fountain 2 (Outer) (4 nos) Inside Physic Garden as highlighted area in attac
Coordinates & Levels of Ring Beams at Entrance of Back of House @ Grid (17-21/Left Side) or 30 to 32
Concrete Pouring for Blinding under Low Current Handholes (MH/PG/LC/18 & 19) and Fire Alarm & Sec
Excavation and Blinding Levels for Low Current Handholes (MH/PG/LC/18 & 19) and Fire Alarm & Secu
Concrete Pouring for Blinding under Electrical Handholes of Emergency (MH/PG/EM/14 & 15) and Low
Excavation and Blinding Levels for Electrical Handholes of Emergency (MH/PG/EM/14 & 15) and Low V
Steel Reinforcement for Duct Tunnel Suspended Slab at MCPE 2 Axis 03H & 03G as highlighted 874.8
Sand Cover and Protection for Irrigation Sub-Main line Distribtion (50 & 110 mm), Between Boat Ga
Inspection & Compaction tests of 4th Layer (Sub-grade) Backfilling (Out of 5 layers) along the Bounda
Sand Bedding for Water Feature Pipes (160mm, 110mm & 63mm), at Management and Maintenance Bui
Inspection for Installed Electrical Handhole of Emergency (MH/PG/EM/05 & 06), Inside Physic Garden
Gravel (Drainage) & Geo Textile (Filter membrane Terrain 1000) for Tree Pits (07 no's) along 1st line
Inspection & Compaction Tests of 4th Layer Backfilling Subgrade (Out of 10 Layers) for SBC-08 (Left Sid
Cementitous water proof coating prior Stone Cladding for ZONE 2R buttress, Infill wall & ring beams ,
Cementitous water proof coating prior Stone Cladding for ZONE 2Q buttress, Infill wall & ring beams ,O
Surface Preparation and Solven Base Primer coating for Buttreess BOI-BOV- 79 , BOI-BOV 80 and 81 ,Zone
Single Layer of 4mm thick Modified Bituminous WaterProofing Membrane for Buttreess BOI-BOV- 79 , B
Shuttering for Infill wall (outer) at Zone 1A at Axis 01B-01C (as highlighted)
'Bedding of Gravel 3/8" and Geotextile Surrounding Pipe Installation of Trees Sub-Surface Drainage
'Bedding of Gravel 3/8" and Geotextile Surrounding Pipe Installation of Trees Sub-Surface Drainage
Pipe Installation of Trees Sub-Surface Drainage (Main Line & Branches) Pipes; ( Perforated110 mmØ
Pipe Installation of Trees Sub-Surface Drainage (Main Line & Branches) Pipes; ( Perforated110 mmØ
Rough Coat (Spatter Dash) Prior to Plastering for all walls (All sides), at 1st & 2nd Floors Inside Site
Surface preparation prior to Cementitiuos water proofing & Stone Cladding for Wall (Outer Face) of B
Surface Preparation Prior to Install Thermal Insulation for Inner face of Boundary wall @ Grid (10-20/
Steel Reinforcement for Ring Beam at Entrance of Back of House @ Grid (17-21/Left Side) or 30 to 32,
Single layer 4mm thick modified bituminous waterproofing membrane on Blinding of Mechanical Room
Surface Preparation and Primer Prior to Membrane Waterproofing on Blinding of Decant Sump-D2 & D
Installation of straight UPVC Conduit (Dia. 160mm) Medium Voltage Ductbank no. CC/D-MV/24 (C/
Level and Location for Infill wall (outer) at Zone 1A at Axis 01B-01C (as highlighted)
Pipe Installation Draine Pipe for AHU (110mmØ - Cast Iron) At Crescent-2 (Devonian Garden), Zone
Level and Location for walls(W3 ) at CAFETERIA Zone 2A Axis 02A-02B (as highlighted)
Level and Location for Blinding under Retaining wall Foundation from Axis 02E-02C , Zone 6&7 (As High
Pre insulated Chilled Water Pipes (S&R) 200mmØ( laying ,Aligment ,Leveling and fit up) From point
Shuttering and concreting for Energy Center Beam at Grid 0-14/I-L at level 878.50 (As Highlighted)
Steel Reinforcements for Energy Center, Columns at Grid 0-4/C-A at level 878.00 ( 17nos ) (As Highlighte
Steel Reinforcements for Energy Center, Beam at Grid 17-27/M at level 878.50 (As Highlighted)
Inspection and Compaction test of 1st and 2nd layer of Back filling of SubGrade for ( 1st ) AHU Unit R
Inspection Of Pipe Installation For Irrigation ROW Mainline (90&160mmØ- UPVC-Claas-5 ); As per Hi
Inspection Of Pipe Installation For Non-Potable Water (Irrigation Main Line); (40&63&50&75&110 m
Inspection and Compaction test for 6th and 7th layer of Back filling Between Infill wall Vertical and I
Inspection and Compaction Test for 2nd Layer of Subgrade Backfilling Between foundation of Internal B
Surface Preparation Prior to start Backfilling for Strip footing ( Outer ) , Zon 1L , Axis 01AJ-01AG, 01/2 (
Excavation for under Foundation Blinding of Retaining wall from axis 02E-02C Zone 6&7 (As Highlighted
Excavation for Retaining wall Foundation Between axis before 01Z to after 01Y at Zone 2 & 3 (As Highli
Shuttering for Blinding under Retaining wall Foundation from Axis 02E-02C Zone 6&7 (As Highlighted)
Concreting for Blinding under Retaining wall Foundation from Axis 02E-02C Zone 6&7 (As Highlighted)
Concreting for Child Care Walls and Columns , Walls W6 (1 no.), W1 (1 no.)) Columns (C3 (1 no.) at Z
Inspection and Compaction Test for backfilling Sub-grade 6th Layer (6 of 10) around SBC-02 - Wing Wall
Inspection of Excavation for Non-Potable Water Line at Zone-G including Pit POC-31 - as highlighted
Block Work laying From level 872.65 to 876.00 for ETFE Pump Room # 6113 at Zone 2G axis 02W (as hig
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 2) between the MV line D/M
Level and Location for Infill wall (Inner) of Zone 2A at Axis 02A-02B ( As Highlighted) Level from( 863.55
Level and Location of Mass concrete (1st Layer ) at Energy Center ( Mechanical ) at Axis 21-22/Q , 23-24/
Inspection for Laying of Red Tiles and Warning Tape above the pipe for MV Line from F/MV/05 to F/MV/
Level and Location for Diaphragm wall ( Vertical ) at zone 1E Axis 01P (As Highlighted)
"Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 2) for Duct Bank of Fire & Sec
Level and Location for Devonian gardens AHU foundation (3rd part) (as highlighted) Zone 2M Axis 02A
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 2) for Duct Bank of Telecommun
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 7) for MV Line Pit F/MV/06 at Z
Level and Location for Rc Foundations of Retaining wall Between Axis 01G-01C Zone 5 (as highlighted)
Inspection and Compaction test for backfilling Sub-grade 4th layer (4 of 6) for Non potable water line
Level and Location for blinding of retaining block wall strip footing Zone 2R North Admin building (KA
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 5) above Sand for Non potable
Inspection of Excavation for MV Line form C/MV/14 to C/MV/18 at Zone-C including pit C/MV/14 and C/
Surface Preparation prior to start Water Proofing for MV Line Pit D/MV/04, D/MV/32 at Zone- D (As Hig
Inspection and Compaction Test for 6th layer Backfilling for Energy Center 2 (As Highlighted) Zone 5A A
Surface Preparation prior to start waterproofing for the Wing Wall of SBC-04 - As Highlighted
Surface Preparation Prior to start Backfilling for ( 1st ) AHU Unit Room of Devonian Garden (as highlig
Inspection and Compaction test for backfilling Sub-grade 4th Layer (4 of 4) for Portion of Parking Area
Inspection and Compaction test of 3rd & 4th Layer of SubGrade backfilling for Retaining wall at Zone 2C
Inspection and Compaction test for backfilling Sub-grade 3rd Layer (3 of 4) for Portion of Parking Area
2nd Coat Cementitiuos water proofing for Wall (Outer Face) of Boundary wall @ Grid (17-23/Left Side)
Concrete Pouring & Shuttering for Dome of New Ticketing Booth # 3A, As per Attached Highlighted D
Inspection of Levels for Dome of New Ticketing Booth # 3A, As per Attached Highlighted Drawing's.
Sand Bedding for Electrical Lines of Emergency (MH/PG/EM/04-07), Inside Physic Garden as highlighte
Excavation and Bed preparation for Sub Surface Drainage Pipes (dia 160 & 110mm) (for Trees) At Bott
Excavation & Bed Preparation for Water Feature Pipes (160mm, 110mm & 63mm), at Management and
Concrete Pouring for Blinding under Electrical Handholes of Emergency (MH/PG/EM/05 & 06), Inside P
Excavation and Blinding Levels for Electrical Handholes of Emergency (MH/PG/EM/05 & 06), Inside Phy
Warning Tiles & Tape on Low Current Lines (MH/WG/LC/14 to 15), Fire Alarm & Security (MH/WG/FA/2
Level and Location for Diaphragm Wall Foundation and Strip Footing at Zone 1E Axis 01M as highlighte
Warning Tiles & Tape on Electrical Lines of Emergency (MH/WG/EM/20 to 21) & Low Voltage (MH/WG/L
Warning Tiles & Tape on Low Current (Main) Lines for Pits (B/TL/53 to22) & (B/FS/45 to 25) Between
Inspection & Compaction tests of 3rd Layer (Sub-grade) Backfilling (Out of 5 layers) along the Bounda
Shuttering and Concreting for Energy Center (27nos) columns at Grid 0-7 / I-L,upto Level 878.00 (As
Inspection of Grouting (Horizontal & Vertical Joints) for Rock and Boulder in Wadi-03 (Right & Left Side
Excavation for Planter Boxes Along Boundary Wall at Top Side of Water Play Garden and Mist Garden,
"Inspection of Formwork and Concrete Pouring for the Expansion Joint of SBC-07 (As Highlighted)"
Inspection of Steel Reinforcement for Footing and Wall of Sub-station - R1 at Zone-C - as highlighted
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 2) above Red Tiles for MV
Inspection and Compaction Test for backfilling Sub-grade 5th Layer (5 of 10) around SBC-02 - Wing Wall
Inspectiona and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 3) along Boundary Wall (Inne
Pre insulated Heat Water Pipes (S&R) 150mmØ( laying ,Aligment ,Leveling and fit up) From point (E
Pre insulated Heat Water Pipes (S&R) 150mmØ( laying ,Aligment ,Leveling and fit up) From point (
Pre insulated Heat Water Pipes (S&R) 200mmØ( laying ,Aligment ,Leveling and fit up) From point (E
Pre insulated chilled Water Pipes (S&R) 200mmØ( laying ,Aligment ,Leveling and fit up) From point
Pre insulated chilled Water Pipes (S&R) 200mmØ( laying ,Aligment ,Leveling and fit up) From poi
Surface Preparation and Solvent Base Primer Coating for Buttress and Infill wall (inner side) from BIV
Single layer of 4mm thick modified bituminous waterproofing membrane for Buttress and Infill wall (in
Protection layer of 4mm thick bituminous protection board for Buttress and Infill wall (inner side) fro
Surface Preparation and Solvent baSe primer for (1st) AHU top of Foundation and Wall upto level 869.
Single layer of 4mm thick modified bituminous waterproofing membrane for (1st) AHU top of Foundati
Antitermite under Mass concrete (1st ) at Energy Center ( Mechanical ) at Axis 21-22/Q , 23-24/N-Q , 25/
Installation of UPVC conduit (dia. 75mm) Low Current Ductbank (Fire & Security) in between Man
Installation of UPVC conduit (dia. 75mm) Low Current Ductbank (TELECOM) in between Manholes (
Installation of UPVC conduit (dia.75mm) Low Voltage Ductbank (Emergency) in between Manholes
Shuttering for Mass concrete (1st Layer )at Energy Center ( Mechanical ) at Axis 21-22/Q , 23-24/N-Q , 25
Concreting of Mass concrete (1st Layer ) at Energy Center ( Mechanical ) at Axis 21-22/Q , 23-24/N-Q , 25
Shuttering for Diaphragm wall ( Vertical ) at zone 1E Axis 01P (As Highlighted)
Concreting for Diaphragm wall ( Vertical ) at zone 1E Axis 01P (As Highlighted)
Steel Reinfocement for Rc Foundations Retaining wall Between Axis 01G-01C Zone 5 (as highlighted)
Shuttering for Rc Foundations of Retaining wall Between Axis 01G-01C Zone 5 (as highlighted)
Shuttering for Devonian gardens AHU foundation (3rd part) (as highlighted) Zone 2M Axis 02AO-02AN
Concreting for Rc Foundations of Retaining wall Between Axis 01G-01C Zone 5 (as highlighted)
Steel reinforcements for MCPE 2 Wall and Counter fort from 871.00 - 875.85 from axis 02AE to 02AG zon
Anti Termite application under blinding of retaining block wall strip footing Zone 2R North Admin buil
Inspection and Compaction test for backfilling Sub-grade 3rd layer (3 of 6) for Non potable water line
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 5) above Sand for Non potable
"Inspection of Formwork and Concrete Pouring for Footing of MV Line Pulling Pit - C/MV/07, C/MV/
Inspection and Compaction test for backfilling Sub-grade 2nd Layer (2 of 3) for Portion of Parking Area
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 3) for Portion of Parking Area
Surface Preparation prior to start backfilling for Portion of Parking Area CPH-5 & CPH-6 beside storm wa
Shuttering for blinding of retaining block wall strip footing Zone 2R North Admin building (KAIG3-SCR-
Inspection of Excavation for MV Line form H/MV/07 to H/MV/08 at Zone-H - as highlighted
Surface Preparation and Solvent Base Primer Coating for RC strip footing between PC 126-128-130 & 13
Single layer of 4mm thick modified bituminous waterproofing membrane for RC Strip Footing at Zone 1
Protection layer of 4mm thick bituminous protection board for RC Strip Footing at Zone 1L Axis 01AG-0
Concreting for Diaphragm wall Foundation and Strip footing at zone 1E Axis 01M (as highlighted) (left pa
Concreting for Infill wall (outer) at Zone 1A at Axis 01A-01B (as highlighted) from 869.20 upto 877.00
Installation of PVC Conduit (Dia. 25mm) for Lighting (EXIT Sign) at the Promenade & Canopies Crescen
Installation of PVC Conduit (Dia. 25mm) and boxes for Lighting System (LED W8, W8/CE) at the South
Installation of PVC Conduit (Dia. 25mm) & Boxes for Power (Socket Outlet) at the South Small Mosque
Installation of Straight PVC Conduit (Dia. 25mm) and Boxes for Fire Alarm System (Break Glass, Interf
Installation of PVC Conduit (Dia.25mm) for Fire Alarm (Fire Telephone & Break Glass) at the South S
Surface Preparation and Primer Coating prior to Membrane Water Proofing on Blinding under Founda
Concrete Pouring & Shuttering for Kicker of Cabin Room, ETFE Pump Room, Water feature Pump Room &
Coordinates & Levels for Kicker of Cabin Room, ETFE Pump Room, Water feature Pump Room & Remainin
Surface preparation prior to Waterproofing on Roof of Public Toilet # 1, At highlighted area in attac
1st Coat Cementitiuos water proofing for Wall (Outer Face) of Boundary wall @ Grid (17-23/Left Side)
Sand Cover & Protection for Low Current Lines (MH/WG/LC/14 to 15), Fire Alarm & Security (MH/WG/
Sand Cover & Protection for Electrical Lines of Emergency (MH/WG/EM/20 to 21) & Low Voltage (MH/
Sand Cover & Protection for Low Current (Main) Lines for Pits (B/TL/53 to22) & (B/FS/45 to 25) Betw
Excavation & Bed Preparation for Electrical Lines of Emergency (MH/PG/EM/04-07), Inside Physic Gard
Steel Reinforcements for Diaphragm Wall (Vertical) at Zone 1E Axis 01P as highlighted.
Protection Layer of 4mm Thick Bituminous Protection Board for Internal Building Wall (W20 & W21)
Installation of Cable Trunk (UPS - 100mm , LTG & SP - 100mm) at Management and Maintenance Bldg.
Installation of Cable Tray (EM - 200mm (CT203) at Management and Maintenance Bldg. (GF 5000C Pass
Installation of Main Fire Water Pipes (75&50mmØ-UPVC-Class-5) At Butterfly Garden- including Bran
Pipe Installation for RW (110mmØ - Cast Iron) for From Ground Floor to First Floor, At Crescent-1,
Mechanical Pipe sleeve Installation ,(CHW S&R) From Axis (02/2A to 02/AF) At Crescent 2 MCPE2; (
Mechanical Pipe sleeve Installation ,Infill Wall inner between Axis (02/AG to 02/AF) At Crescent 2
'Bedding of Gravel 3/8" and Geotextile Surrounding Pipe Installation of Trees Sub-Surface Drainage
Pipe Installation of Trees Sub-Surface Drainage (Main Line & Branches) Pipes; ( Perforated110 mmØ
Installation of straight UPVC Conduit (Dia. 160mm) Medium Voltage Ductbank (C/MV/41 to C/MV/07
Installation of PVC Conduit (Dia.25mm) & Boxes for Fire Alarm (Smoke Detector) at the Large Mosque
Installation of Straight PVC Conduit (Dia. 25mm) and Box for Security (CAM) in the Promenade & Cano
Installation of Straight PVC Conduit (Dia. 25mm) and Box for Voice Data (CAM) in the Promenade & Ca
Installation of Straight PVC Conduit (Dia. 25mm) and Boxes for Fire Alarm (Speaker) in the Promenad
Inspection of Excavation for MV Line form B/MV22 to B/MV/14 at Zone-B - as highlighted
Inspection of Excavation for LV Line from B/LV/24 to C/LV/02 at Zone-B including Pit - B/LV/24, B/LV/44
Inspection of Excavation for Non-Potable Water Line at Zone-C including Pit POC-20, NPW-ISC-26, NPW-
Inspection of Headwall and Stone Boulder for Outfall-G - As Highlighted
Coordinates & Levels for Wall of Fountain 1 (1 no's) at Right side of Outer Canopy 3, Inside Physic Ga
Rough Coat (Spatter Dash) Prior to Plastering for wall (Both sides) at Grid 1, Inside Site Tower 2, as
Surface preparation prior to Cementitiuos water proofing & Stone Cladding for Wall (Outer Face) of B
Concrete Pouring & shuttering for Wall of Fountain 1 (1 no's) at Right side of Outer Canopy 3, Inside
Steel Reinforcement for Wall of Fountain 1 (1 no's) at Right side of Outer Canopy 3, Inside Physic Gar
Steel Reinforcement for Dome of New Ticketing Booth # 3A, As per Attached Highlighted Drawing's.
Gravel (Drainage) & Geo Textile (Filter membrane Terrain 1000) for Planting area insdie Tunnel at But
Gravel (Drainage) & Geo Textile (Filter membrane Terrain 1000) for Tree Pits (42 no's) Between Geys
Excavation for Tree Pits (42 no's) Between Geyser Garden and Aviary Garden and Water Play Garden,
Marking & Check for coordinates of Tree Pits (19 no's) Between Geyser Garden and Aviary Garden, A
Inspection of Thrust Blocks for Irrigation Sub-Main line Distribtion (50 & 110 mm), Between Boat G
Excavation and Bed preparation for Sub Surface Drainage Pipes (dia 110 mm PP) (for Trees) At leftsid
Concrete Pouring for Blinding under Decant Sump-D2 at Geyser Garden, inside Water Garden as high
Concrete Pouring for Blinding under Decant Sump-D3 at Mist Garden, inside Water Garden as highli
Level and Location for Foundation of Retaining wall at Axis 01S-01U ( from Movement Joint to Movemen
Excavation for North watch tower under S.O.G in Zone 1 (as highlighted)
Surface Preparation and Solvent Base Primer Coating on Blinding under Foundation Retaining wall, Zone
Inspection of Rush coat (spatter dash) for ETFE Room # 6146 ( Outside ) at Zone 2D Axis 02J (as highl
Level and location for Excavation for Retaining wall Foundation Between axis before 01Z to after 01Y at
Inspection and Compaction test for 4th and 5th layer of Back filling Between Infill wall Vertical and I
Inspection and Compaction test of Back filling for 6th Layer of SubGrade for Retaining Wall for Zone 1A,
Inspection and compaction test of Back filling for 8th Layer of SubGrade for Infill wall and Butress ( O
Inspection and Compaction test of Back filling for 6th Layer of SubGrade Between Infill Wall (outer ) an
Level and Location for Retaining wall (Blinding) Between axis before 01Z to after 01Y at Zone 2 & 3 (As
Level and Location for Child Care Walls and Columns , Walls W6 (1 no.), W1 (1 no.)) Columns (C3 (1 no
Inspection and Compaction Test for 1st layer of Subgrade Bachfilling between Foundation of Internal
Level and Location for Infill wall (outer) at Zone 1A at Axis 01A-01B (as highlighted) from 869.20 upto 8
Installed Aluminum Caps between Axis 02/AH - 02/AI.
Installed Aluminum Caps between Axis 02/AJ - 02/AK.
Installed Aluminum Caps between Axis 02/AI - 02/AJ.
Installed Aluminum Caps between Axis 02/AK - 02/AL.
Steel Reinforcement for Energy Center for Wall (W4) at Grid 0-1/C-1 from level 877.00 to 882.30 as h
Concreting for Infill Wall (KICKER & UPSTAND) Between BI 86-87 (Inner) as highlighted Zone 2G betwee
Shuttering for Retaining wall (Blinding) Between axis before 01Z to after 01Y at Zone 2 & 3 (As Highligh
Two layers of 4mm thick modified bituminous waterproofing membrane for MCPE 3 inner wall & counter
Protection layer of 4mm thick bituminous protection board for MCPE 3 inner wall & counter fort and tu
Steel Reinforcements for Devonian gardens AHU foundation (3rd part) (as highlighted) Zone 2M Axis
Concreting For North Administration Building Zone 2R Axis 02AZ , 02BA , 02BB , Walls ( W18 , W17 ,W5
Concreting for Infill wall (Inner ( Vertical ) ) at Zone 2K at Between Axis 02AE-02AF ( As Highlighted)
Steel Reinforcements for Infill wall (inner) at Zone 1A at Axis 01B-01C-01D (as highlighted) from level
Shuttering for Diaphragm wall Foundation and Strip footing at zone 1E Axis 01M (as highlighted) (left pa
Shuttering for Child Care Walls and Columns , Walls W6 (1 no.), W1 (1 no.)) Columns (C3 (1 no.) at Zo
Surface Preparation and Solvent Base Primer Coating on Blinding under Foundation of Retaining wall, Z
Two layers of 4mm thick modified bituminous waterproofing membrane on Blinding under Foundation of
Protection layer of 4mm thick bituminous protection board on Blinding under Foundation of Retaining w
Cementitious waterproofing on Blinding under Foundation of Retaining wall, Zone 5 Axis 01C-01D-01E-0
Inspection of Plaster Guide Point and Plaster Accessories for ETFE Room (Outside Wall) Pump Room #
Level and Location for Large Mosque for (upper first floor) for Beams (B119, B120, B131, B132, B133,
Cementitous Water Proofing on Blinding under Foundation Retaining wall, Zone 2&3 Axis 01S-01P (As H
Two layers of 4mm thick modified bituminous waterproofing membrane on Blinding under Foundation Re
Protection layer of 4mm thick bituminous protection board on Blinding under Foundation Retaining wall
Shuttering for Infill wall (outer) at Zone 1A at Axis 01A-01B (as highlighted) from 869.20 upto 877.00
Steel Reinforcements for Diaphragm wall Foundation and Strip footing at zone 1E Axis 01M (as highlighte
Concreting of Mass concrete (1st ) at Energy Center ( Mechanical ) at Axis 16-19/N , 21-22/N , 12-19/O-P
Installation of Main Fire Water Pipes (250mmØ-UPVC-Class-5) At zone L- including PIT(L/F/04) .As pe
Installation of Main Potable Water Pipes (160 mmØ-UPVC-Class-5) at Zone L-including PIT(L/PW/05) .
Pre insulated chilled Water Pipes (S&R) 400mmØ( laying ,Aligment ,Leveling and fit up) From point
Level and Location for Duct Tunnel Suspended Slab at MCPE 2 Axis 03H & 03G (as highlighted) 874.80 Z
Level and Location for MCPE 2 Inner wall and Counter fort at Axis 03K to 02AD (as highlighted) 875.55 Z
Plastering for Walls Inside Staircase room (GF-5076) at Ground floor and Roof floor Rooms, at Grid
2nd Coat Cementitiuos water proofing for Wall (Outer Face) of Boundary wall @ Grid (1-7/Left Side),
Plaster Guide Points & Accessories Prior to Plastering for wall (Both sides) at Grid 1, Inside Site Towe
Inspection & Compaction tests of 2nd Layer (Sub-grade) Backfilling (Out of 3 layers) along the Bounda
Surface Preparation and Primer Prior to Membrane Waterproofing on Blinding of Decant Sump-D1 at B
Excavation and Bed preparation for Sub Surface Pipe Lines (dia 110 mm PP) at left side Access of Tunne
Sand Bedding for Fire Fighting Lines (Pipe dia 50 & 80 mm) at both ends of Tunnel, inside Butterfly Ga
Excavation and Bed preparation for Fire Fighting Lines (Pipe dia 50 & 80 mm) at both ends of Tunnel,
Shuttering for Columns C@ at Zone 2N Child Care as highlighted C2 5nos. up to bottom of Slab.
Shuttering for Duct Tunnel Suspended Slab at MCPE 2 Axis 03H & 03G (as highlighted) 874.80 Zone 2H
Concreting for Duct Tunnel Suspended Slab at MCPE 2 Axis 03H & 03G (as highlighted) 874.80 Zone 2H
Inspection and Compaction test of 1st and 2nd Layer of SubGrade backfilling for Retaining wall at Zone
Concreting for Columns C2 at Zone 2N Child Care as highlighted (C2 -5 nos.) up to bottom of Slab.
Level and Location for Mass concrete (2nd layer) under Strip footing (inner) at Zone 1M Between PC 7
Shuttering for Large Mosque for Upper First Floor for Columns & Walls (C4,C5, C1B, W5) Axis C-E, 2-5
Shuttering for MCPE 2 Inner wall and Counter fort at Axis 03K to 02AD (as highlighted) 875.55 Zone 2J
Surface Preparation and Solvent Base Primer Coating for Infill Wall (Inner Side) between Axis 02E-02F
Concreting for MCPE 2 Inner wall and Counter fort at Axis 03K to 02AD (as highlighted) 875.55 Zone 2J
Steel Reinforcements for South small mosque wall W3 from level 873.15 up to 873.88 axis 1-2, D (as hig
Steel Reinforcements for Energy Center, Beam at Grid 0-14/I-L at level 878.50 (As Highlighted)
Steel Reinforcements for Infill wall (Inner) of Zone 2K at Axis 02AG-02AF ( As Highlighted)
Shuttering for Mass concrete (2nd layer) under Strip footing (inner) at Zone 1M Between PC 72-74 & 76
Concreting for Mass concrete (2nd layer) under Strip footing (inner) at Zone 1M Between PC 72-74 & 7
Inspection of spatter dash ( Rush Coat) for ETFE Room ( Inside Wall ) Pump Room # 6089 at Zone 1C axi
Shuttering for STAIR at Large Mosque, Axis E-F, 1-1.1 zone 1G (as highlighted)
Surface Preparation Prior to start Backfilling for Retaining Wall at AXIS 01G - 01K Zone 1C (as highlighte
Installation of AIR ROD (Length 3m) & ROD Bracket for Earthing & Lightning System (Air Terminal) besi
Excavation and Bed preparation for Irrigation Lines (Dia 50 & 110 mm) along the Boundary wall inside
Installation of PVC Conduit (Dia. 25mm) & Boxes for Power System (Disconnect Switch) at New Ticket
Inspection and Compaction test for 2nd and 3rd layer of Back filling Between Infill wall Vertical and
Inspection and Compaction test of Back filling for 5th Layer of SubGrade for Retaining Wall for Zone 1A,
Inspection and Compaction test of 1st and 2nd Layer of Gravel backfilling for Retaining wall at Zone 2C
Inspection of Plaster Guide Point and Plaster Accessories for ETFE Room # 6146 ( Outside ) at Zone 2D A
Inspection and Compaction test of 3rd Layer Backfilling Subgrade for Soak Away Pipe at Jurassic Garden
Inspection and Compaction test for 2nd layer Backfilling to create slope Formation for EPDM Bedding f
Excavation and Bed Preparation for Water Feature drainage Pipe at Jurassic Garden , Zone 2H 2G ( As Hi
Level and Location For North Administration Building Zone 2R Axis 02AZ , 02BA , 02BB , Walls ( W18 ,
Level and Location for Mass concrete (1st ) at Energy Center ( Mechanical ) at Axis 16-19/N , 21-22/N ,
Level and Location for Energy Center,Beam at Grid 7-11/A at level 881.50 (As Highlighted)
Level and Location for Energy Center, columns at Grid 28-30/M-N ( 20 nos ) at level 878.00 (As Highligh
Level and Location for Front Canopy Foundation (3nos) at Zone 4 Axis 01J, 01I, 01H (As Highlighted) TO
Installation and Survey Report for Location and Levels of Anchor bolts for Front Canopy Foundation at Z
Steel reinforcements for Child Care Walls and Columns , Walls ( W1 , W2 , W3 , W6 , W7 ) Columns ( C3
Shuttering For North Administration Building Zone 2R Axis 02AZ , 02BA , 02BB , Walls ( W18 , W17 ,W5
Antitermite under Mass concrete (1st ) at Energy Center ( Mechanical ) at Axis 16-19/N , 21-22/N , 12-19
Shuttering Mass concrete (1st ) at Energy Center ( Mechanical ) at Axis 16-19/N , 21-22/N , 12-19/O-P ,
Solvent Base Primer Coating prior to Membrane Water proofing on Blinding of Decant Sump-D4 Inside
Shuttering and concreting for Energy Center,Beam at Grid 7-11/A at level 881.50 (As Highlighted)
Shuttering and concreting for Energy Center, columns at Grid 28-30/R ( 20 nos ) at level 878.00 (As Highl
Steel Reinfocements for Diaphragm wall at zone 1E Axis 01M (As Highlighted) Upto Level 868.5
Steel Reinforcements for Devonian Garden Wall at Zone 2M (As Highlighted) TOC 874.60
Steel reinforcements for Front Canopy Foundation (3nos) at Zone 4 Axis 01J, 01I, 01H (As Highlighted)
Shuttering for Front Canopy Foundation (3nos) at Zone 4 Axis 01J, 01I, 01H (As Highlighted) TOC 865.05
Concreting for Front Canopy Foundation (3nos) at Zone 4 Axis 01J, 01I, 01H (As Highlighted) TOC 865.05
Surface Preparation and Solvent base primer coating for under Foundation of Strip Footing at Zone 1M
Single Layer of 4mm thick Modified Bituminous WaterProofing Membrane for under Foundation of Stri
Protection Layer of Geotextile and screed for under Foundation of Strip Footing at Zone 1M at Axis 01
Level and Location for MCPE 2 Roof slab at Zone 2K axis 03E to 02X (as highlighted) TOC 875.974 & 8
Surface Preparation Prior Back filling for Retaining Wall for Zone 1A , Axis 02M - 02I (as highlighted)
Excavation & Surface Preparation for Planting area insdie Tunnel at Butterfly Garden, as highlighted a
Inspection for Installed Low Current Handhole of Fire Alarm & Security (MH/WG/FA/17 & 18) and Low
Inspection for Installed Electrical Handhole of Emergency (MH/WG/EM/16 & 17), Inside Geyser Garden
Inspection & Compaction tests of Single Layer (Sub-Grade) Backfilling above sand cover for Irrigation
Excavation and Surface preparation for Decant Sump-D3 at Mist Garden, inside Water Garden as hig
Concrete Pouring & Shuttering for Foundation & Kicker of Decant Sump-D4 Inside Water Play garden,
Steel Reinforcement for Foundation & Kicker of Decant Sump-D4 Inside Water Play garden, at Water G
Excavation and Surface preparation for Decant Sump-D2 at Geyser Garden, inside Water Garden as h
Inspection of Sand Covering Layer for Protection of MV Line from F/MV/05 to F/MV/06 at Zone-F - as hig
Inspection and Compaction test for backfilling Sub-grade 9th Layer (9 of 9) for SBC-07 - including Wing w
Surface Preparation prior to start backfilling for MV Line Pit F/MV/05 and F/MV/06 at Zone- F (As Highli
Surface Preparation prior to start backfilling for Duct Bank of Fire & Security line from F/FS/03 to F/FS/
Surface Preparation prior to start backfilling for Duct Bank of Telecommunications line from F/TL/03 to
Inspection and Compaction Test for backfilling Sub-grade 4th Layer (4 of 10) around SBC-02 - Wing Wall
Inspectiona and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 3) along Boundary Wall (Inne
"Inspection of Steel Reinforcement for Footing and Wall of MV Line Pulling Pit - C/MV/07, C/MV/08
Coordinates and Levels of Blinding under Decant Sump-D3 at Mist Garden, inside Water Garden as h
Coordinates & Levels for Foundation & Kicker of Decant Sump-D4 Inside Water Play garden, at Water
Coordinates and Levels of Blinding under Decant Sump-D2 at Geyser Garden, inside Water Garden as
Coordinates & Levels of Blinding under Fountain 2 (Inner) (2 nos) Inside Physic Garden as highlighted
Steel Reinforcement for Fountain 2 (Outer) (4 nos) Inside Physic Garden as highlighted area in attach
Concrete Pouring for Blinding under Fountain 2 (Inner) (2 nos) Inside Physic Garden as highlighted ar
Leak Test for Tank of Wet Well F, Inside Water Garden as highlighted area in attached drawing's.
Screed protection with Geo Textile for Wet Area inside Toilets (GF-5041 & 5042) Disabled Toilet (
Installation of UPVC conduit (dia.160mm) Low Voltage Ductbank (Submain Cable) in between Manhol
Installation of UPVC conduit (dia. 50mm &75mm) passing through the Wall for Low Voltage Ductbank (
Installation of UPVC conduit (dia. 75mm) Low Current Ductbank (TELECOM) passing through the Wall at
Inspection and Compaction test for backfilling Sub-grade 1st layer (1 of 2) above Red Tiles for MV L
Inspection for Installation of Fire Water Line Pit - B/F/02 at Zone-B - as highlighted
Installation of Potable Water Line Pit B/PW/10 at Zone-B - as highlighted
Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 10) around SBC-02 - Wing Wall
Inspection and Compaction test for backfilling Sub-grade 8th Layer (8 of 9) for SBC-07 - including Wing w
Inspection and Compaction Test for backfilling Sub-Grade 3rd layer (3 of 3) for Parking Area CPH-1 bes
Inspection and Compaction Test for backfilling Sub-Grade 2nd layer (2 of 3) for Parking Area CPH-1 bes
Inspectiona and Compaction Test for backfilling Sub-grade 1st Layer (1of 3) along Boundary Wall (Inner
Inspection and Compaction test for backfilling Sub-grade 2nd layer (2 of 6) for Non potable water line
Inspection of backfilling Sand 2nd Layer (2 of 3) for Non potable water line Pit NPW-ISC-22 at Zone-L - A
Inspection of Sand bedding under pipe for LV Line between B/LV/15 to B/LV/47 and B/LV/55 to B/LV/38 a
Inspection and Compaction test for Sub-base 3rd Layer (3 of 3) for Car Park-H (CPH1 - ST.0+000 to 0+140
Mock up inspection of Copping for Seating Area (1) at Zone-G (SA-11) - As Highlighted (Note: This sampl
Inspection of Blinding Concrete under Heating and Chilled Water Line Pit B/DC/07 at Zone-B - As highli
Inspection of Excavation for Heating and Chilled Water Line Pit B/DC/07 at Zone-B - As highlighted
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 2) above Red Tiles for MV
Inspection of Blinding Concrete under Sub-station - R1 at Zone-C - as highlighted
Inspection of Excavation for Sub-station - R13 at Zone-F - as highlighted
Soil Preparation under Boulder No. WRB-56
Inspection and Compaction Test for backfilling Sub-Grade 1st layer (1 of 3) for Parking Area CPH-1 besi
Surface Preparation prior to start backfilling for Parking Area CPH-1 beside storm water line @ Zone-G -
Inspection of Sand bedding under pipe for LV Line at Zone-6 - as highlighted (Stock Pile# 154)
Inspection of Sand bedding under pipe for LV Line at Zone-6 - as highlighted (Stock Pile# 154)
Inspection of Sand bedding under pipe for Potable Water Line at Zone-6 - as highlighted (Stock Pile# 154
Inspection of Sand bedding under pipe for Fire Water Line at Zone-6 - as highlighted (Stock Pile# 154)
Inspection of Sand beding under pipe for Non-Potable Water Line at Zone-6- as highlighted (Stock Pile#
Inspection of Sand bedding under pipe for RO Water Line at Zone-6 - As highlighted (Stock Pile# 154)
Installed ETFE Cushions in Zone 2B between axis 02-E/02-F without Aluminum Caps.
Inspection and Compaction test for backfilling Sub-grade 7th Layer (7 of 9) for SBC-07 - including Wing w
Inspection and Compaction test for backfilling Sub-grade 1st layer (1 of 6) for Non potable water line
Inspection of backfilling Sand 1st Layer (1 of 3) for Non potable water line Pit NPW-ISC-22 at Zone-L - A
Inspection of Steel Reinforcement for footing and wall of Cesspool-1 at Zone-K - as highlighted
Inspection for Installation of Stone Cladding without Copping for Seating Area 1- 10 at Zone-G (As Highl
Inspection of Backfilling Soil Mix (70%Sand, 10%Sweet Soil, 10% Organic material, 10% Perlite) for Tree P
Inspection of Backfilling Gravel 1st Layer (1 of 1) and Geotextile for Tree Pit (22No's) as Details D-38-1-
Protection Layer of 4mm thick Bituminous Protection Board for Infill wall ( Outer side) Between Axis 02
SingleLayer of 4mm thick Modified Bituminous WaterProofing Membrane for Infill wall ( Outer side) Be
Inspection & Compaction tests of Single Layer (Sub-Grade) Backfilling above sand cover for Irrigation
Inspection & Compaction tests of Single Layer (Sub-Grade) Backfilling above sand cover for Water Fea
Surface Preparation and Primer Coating prior to Membrane Water Proofing for Foundations Inside Pla
2nd Coat Cementitious Water proofing for Wing Walls (Inner Side) (Upto 15cm above FGL) of SBC-07 (
1st Coat Cementitiuos water proofing for Wall (Outer Face) of Boundary wall @ Grid (1-7/Left Side), a
Inspection of Plaster Guide Point and Plaster Accessories for ETFE Pump Room # 6144 at Zone 2D axis
2nd Coat Cementitiuos Water Proofing for Wall (Outer Face) of Boundary wall @ Grid (7-20/Left Side),
Inspection of Rush Coat (spatter dash) for ETFE Pump Room # 6144 at Zone 2D axis 02L outside of the
Inspection and Compaction Test for 5th layer Backfilling for Energy Center 2 (As Highlighted) Zone 5A A
Surface Preparation Prior to start Backfilling Between foundation of Internal Building and Tunnel shaft
Surface preparation prior start backfilling for Retaining wall at Zone 2C Axis 02G to 02I (As highlighted)
Inspection and Compaction test for 14th layer of Backfilling of SubGrade at Zone 1D between PC 23-25
Inspection and Compaction test of Back filling for 4th and 5th Layer of SubGrade Between Infill Wall (out
Inspection and Compaction test for 1st layer of 8th layers Back filling Between Infill wall Vertical an
Level and Location for RC ( inner )Strip Footing at Zone 1L From Axis 01AG to 01AH and 01AI to 01AJ (As
Level and Location for Infill wall (Inner ( Vertical ) ) at Zone 2K at Between Axis 02AE-02AF ( As Highlight
Level and Location for Infill wall (Inner) at Zone 1D at Axis 01K-01L (1st Stage) ( As Highlighted)
Level and Location for Retaining wall (wall) from axis 02E-02F Zone 6&7 (As Highlighted)
Level and Location for MCPE 2 Duct tunnel Suspened Slab at Axis 03E and 03F, Zone 2G (As Highlighted
Shuttering for Infill wall (Inner) at Zone 1D at Axis 01K-01L (1st Stage) ( As Highlighted)
Steel Reinforcements for ( outer ) Infill wall at Zone 1D at Axis 01K-01J ( As Highlighted)
Shuttering for Infill wall (Inner ( Vertical ) ) at Zone 2K at Between Axis 02AE-02AF ( As Highlighted)
Shuttering for Retaining wall (wall) from axis 02E-02F Zone 6&7 (As Highlighted)
Surface Preparation and Solvent Base Primer Coating for Front Canopy Foundation at Zone 1 Axis 01 AQ
Concreting for Retaining wall (wall) from axis 02E-02F Zone 6&7 (As Highlighted)
Concreting for blinding of retaining wall foundation zone 3 from axis 01P-01S (as highligted)
Steel Reinforcements for Infill wall (Inner) of Zone 2A at Axis 02A-02B from 863.55 to 869.10 ( As Highli
Steel Reinforcements for South Small Mosque Outer wall ( First Floor ) at Axis D-G, G ( 1-2 ) & G ( 3-4
Surface Preparation and Solvent Base Primer Coating for RC Strip Footing at Zone 1L Axis 01AG-01AH-01
Protection Layer of Geotextile & Screed Above Foundation of Retainig wall From Axis 02J-02G, Zone 6&7
Steel Reinforcment for Large Mosque for ( Upper First Floor ) for 2 Columns ( C 1A ) , Axis B-3 , B-4 2-
Steel Reinforcment for Large Mosque for ( Upper First Floor ) for Beams ( B119, B120, B133, B132, B1
Shuttering for Large Mosque for ( Upper First Floor ) for Beams ( B119, B120, B131, B132, B133, B127,
Steel Reinforcement for MCPE 2 Duct tunnel Suspened Slab at Axis 03E and 03F, Zone 2G (As Highlighted
Shuttering for MCPE 2 Duct tunnel Suspened Slab at Axis 03E and 03F, Zone 2G (As Highlighted ) Level 8
Concreting for MCPE 2 Duct tunnel Suspened Slab at Axis 03E and 03F, Zone 2G (As Highlighted ) Level
Steel Reinforcement for RC ( inner )Strip Footing at Zone 1L From Axis 01AG to 01AH and 01AI to 01AJ (
Concreting for RC ( inner )Strip Footing at Zone 1L From Axis 01AG to 01AH and 01AI to 01AJ (As Highlig
Shuttering for RC ( inner )Strip Footing at Zone 1L From Axis 01AG to 01AH and 01AI to 01AJ (As Highlig
Surface Preparation and Solvent base primer coating for diaphragm wall Under Foundation ( 5 Foundatio
Protection Layer of 4mm thick Bituminous Protection Board for diaphragm wall Under Foundation ( 5 Fou
Shuttering for COLUMNS ( C2 - 8 nos) (C3 - 2 nos) at Zone 2N Child Care (as highlighted) Upto bottom of
Concreting for COLUMNS ( C2 - 8 nos) (C3 - 2 nos) at Zone 2N Child Care (as highlighted) Upto bottom of
Level and Location for COLUMNS ( C2 - 8 nos) (C3 - 2 nos) at Zone 2N Child Care (as highlighted) Upto b
Surface Preparation and Solvent base primer coating for Internal Building wall ( W20 & W21 ) at Zone
Antitermite under Blinding of Diaphragm wall Foundation at Zone 2C Axis 02J (As Highlighted)
Level and Location for Blinding of Diaphragm wall Foundation at Zone 2C Axis 02J (As Highlighted)
Level and Location for Energy Center, Beam at level 875.35 Grid 0-4/C-A (As Highlighted)
Installation of PVC Conduit (Dia.25mm) & Boxes for Fire Alarm (Flash Beacon, Speaker) at South Resta
Level and Location for Columns of Energy Center at Grid 0-1/C (1 no ) Level 874.85 (As Highlighted)
Level and Location for Diaphragm wall ( 2nd Span ) Vertical Wall at zone 1E Axis 01P (As Highlighted) up
Installation of straight UPVC Conduit (Dia. 160mm) Low Voltage Ductbank no. KK/D-LV/04 (K/LV/22 t
Inspection and Compaction test of Back filling for 1st and 2nd Layer of SubGrade for Retaining Wall for
Inspection and Compaction test for 2nd and 3rd Layer ( Sub Grade ) Backfilling for Between Tunnel Wall
Inspection and Compaction test for 12th & 13th layer of Backfilling of SubGrade at Zone 1D between PC
Inspection and Compaction test of Back filling for 1st Layer of SubGrade Between Infill Wall (outer ) and
Inspection and Compaction test for 1st Layer ( Sub Grade ) Backfilling for Between Tunnel Wall and Strip
Inspection and compaction test of Back filling for 3rd Layer of SubGrade for Infill wall and Butress ( O
Inspection of Back filling for 1st and 2nd OF 2 Layer Gravel for Retaining Wall for Zone 1A , Axis 02M -
Inspection and Compaction test for 1st layer of of SubGrade Continuation Backfilling for Tunnel wall
Inspection and Compaction test for 2ed and 3rd layer of SubGrade Continuation Backfilling for Tunnel
Inspection and Compaction Test for 1st layer Backfilling to create slope Formation for EDPM Bedding fo
Inspection and Compaction Test for 2nd layer Backfilling to create slope Formation for EDPM Bedding f
Inspection and Compaction test of 1st and 2nd Layer Backfilling Subgrade for Soak Away Pipe at Jurassi
Level and Location for MCPE 2 Roof Slab,Axis 02X-03F,Zone 2G (As Highlighted )
Concreting for MCPE 2 Roof Slab,Axis 02X-03F,Zone 2G(As Highlighted )
Shuttering for MCPE 2 Roof Slab,Axis 02X-03F,Zone 2G (As Highlighted )
Steel Reinforcement for MCPE 2 Roof Slab, Axis 02X-03F,Zone 2G (As Highlighted )
Shuttering for Large Mosque for Upper First Floor for Columns ( C4,C5,C1B ) & Walls ( W5 ) , Axis C-E, 2-
Installed ETFE Cushions (without aluminum caps) between axis 02-AE/02-AF.
Shuttering and Concreting for Columns of Energy Center, Grid 22-27/M ( 21 nos ) & Grid 28-30/R-N ( 27
Shuttering for blinding of retaining wall foundation zone 3 from axis 01P-01S (as highligted)
Shuttering for Mass concrete under Strip footing (outer) at Zone 1M Between PC 71-73-75-77 (as highl
Shuttering for Diaphragm wall foundation (4) & strip footing (3) at zone 1E Axis 01P (As Highlighted)
Steel reinforcements for COLUMNS ( C2 - 8 nos) (C3 - 2 nos) at Zone 2N Child Care (as highlighted) Upto
Steel Reinforcements for Infill wall at Zone 2M at Axis 02AO (as highlighted)
Steel Reinforcements for Retaining wall (wall) from axis 02E-02F Zone 6&7 (as highlighted)
Concreting for Kicker of Infill wall for Zone 1A between Axis 01A-01B-01C-01D (PC 1-3-5, 2-4-6-8) (as hig
Level and Location for Large Mosque for Upper First Floor for Columns ( C4,C5,C1B ) & Walls ( W5 ) , Axis
Level and Location for blinding of retaining wall foundation zone 3 from axis 01P-01S (as highligted)
Level and Location for Columns of Energy Center, Grid 22-27/M ( 21 nos ) & Grid 28-30/R-N ( 27 nos ) up
Installed ETFE Cushions in Zone 2J between axis 02-AC/02-AD without Aluminum Caps.
Level and Location for Diaphragm wall foundation (4) & strip footing (3) at zone 1E Axis 01P (As Highlig
Installed ETFE Cushions in Zone 2B between axis 02-D/02-E without Aluminum Caps.
Level and Location for Mass concrete under Strip footing (outer) at Zone 1M Between PC 71-73-75-77 (
Installed ETFE Cushions in Zone 2C between axis 02-I/02-J without Aluminum Caps.
Installed ETFE Cushions in Zone 2C between axis 02-H/02-I without Aluminum Caps.
Level and Location for Kicker of outer Infill wall for Zone 1A between Axis 01A-01B-01C (PC 1-3-5) (as hi
Installed ETFE Cushions in Zone 2C between axis 02-G/02-H without Aluminum Caps.
Installed ETFE Cushions in Zone 2B between axis 02-F/02-G without Aluminum Caps.
Level and Location for ( Inner Side ) Infill Wall at Zone 2A, Axis between 02C-02B (As Highlighted) Level
Installed Base Extrusion and Base Seal between Axis 02/W - 02/X.
Installed Base Extrusion and Base Seal between Axis 02/X - 02/Y.
Installed Base Extrusion and Base Seal between Axis 02/V - 02/W.
Installed ETFE Cushions in Zone 2E between axis 02-Q/02-R without Aluminum Caps.
Installed ETFE Cushions in Zone 2F between axis 02-R/02-S without Aluminum Caps.
Installed ETFE Cushions in Zone 2F between axis 02-S/02-T without Aluminum Caps.
Installed ETFE Cushions in Zone 2E between axis 02-T/02-U without Aluminum Caps.
Installed ETFE Cushions in Zone 2E between axis 02-AC/02-AD without Aluminum Caps.
Installed ETFE Cushions in Zone 2F between axis 02-U/02-V without Aluminum Caps.
Installed ETFE Cushions in Zone 2J between axis 02-AD/02-AE without Aluminum Caps.
Installed ETFE Cushions in Zone 2E between axis 02-O/02-P without Aluminum Caps.
Installation of straight PVC Conduit (Dia. 25mm) & Boxes for Lighting System (LED W5, LED W5/E) at
Installed ETFE Cushions (without aluminum caps) between axis 02-J/02-K.
Installation of straight PVC Conduit (Dia. 25mm) & Boxes for Power System (Socket Outlet) at Second
Steel Reinforcements for Infill wall (outer) at Zone 1A at Axis 01A-01B (as highlighted)
Steel Reinforcements for Infill wall (outer) at Zone 1A at Axis 01B-01C (as highlighted)
Installation of straight UPVC Conduit (Dia. 160mm) Low Voltage Ductbank no. KK/D-LV/20 (K/LV/05
Installed ETFE Cushions in Zone 2E between axis 02-P/02-Q without Aluminum Caps.
Shuttering for ( Inner Side ) Infill Wall at Zone 2A, Axis between 02C-02B (As Highlighted) Level from 86
Concreting for ( Inner Side ) Infill Wall at Zone 2A, Axis between 02C-02B (As Highlighted) Level from 86
Installed ETFE Cushions in Zone 2E between axis 02-N/02-O without Aluminum Caps.
Installation of Straight PVC Conduit (Dia. 25mm) and Boxes for Security System (Door Release, Door
Installation of Straight PVC Conduit (Dia. 25mm) and Boxes for Voice & Data System (Data Outlet for D
Pre insulated chilled Water Pipes (S&R) 200mmØ ( laying ,Aligment ,Leveling and fit up) From point
Pre insulated chilled Water Pipes (S&R) 400mmØ ( laying ,Aligment ,Leveling and fit up) From point
Level and Location for ( Outer )Infill Wall at Zone 2F, Axis between 02U-02V (As Highlighted)
Level and Location for Mass concrete under Strip footing ( INNER ) (1st Layer )at Zone 1M Between PC
Inspection and Compaction Test for 6th layer Backfilling to create slope Formation for EDPM Bedding
Level and Location for Large Mosque for Upper First Floor for Columns & Walls ( C1 ) , Axis C-E, 2-5 Zon
Steel Reinforcements for Infill wall (Inner) at Zone 1D at Axis 01K-01L (1st Stage) ( As Highlighted)
Inspection and compaction test of Back filling for 2nd Layer of SubGrade for Infill wall and Butress ( O
Steel Reinforcements for Infill wall (Inner ( Vertical ) ) at Zone 2K at Between Axis 02AE-02AF ( As Highli
Inspection and Compaction test for 10th & 11th layer of Backfilling of SubGrade at Zone 1D between PC
Shuttering for ( Outer )Infill Wall at Zone 2F, Axis between 02U-02V (As Highlighted)
Concreting for ( Outer )Infill Wall at Zone 2F, Axis between 02U-02V (As Highlighted)
Surface Preparation Prior Back filling for Between Infill Wall (outer ) and Soth Small Mosque ( Inner ) at
Steel Reinforcements for Energy Center, columns at Grid 28-30/R ( 20 nos ) at level 878.00 (As Highlight
Steel Reinforcements for Energy Center,Beam at Grid 7-11/A at level 881.50 (As Highlighted)
Steel Reinforcements for South Watch Tower Wall upto Level 864.50 (as highlighted) Zone 7
Inspection and Compaction test for 2nd of 2nd layer Subgrade backfilling at Strip footing zone 2E betw
Steel Reinfocements for ( 1st span ) Beam of Diaphragm wall at zone 1E , Axis 01P (As Highlighted) up
Inspection and compaction for 2nd Layer backfilling of Internal Foundation of Energy Center at Grid 1-3
Steel Reinforcement for MCPE 2 Wall & Counterfort , Axis 03K-02AE, Zone 2J (As Highlighted )
Antitermite under Mass concrete under Strip footing ( INNER ) ( 1st Layer ) at Zone 1M Between PC 72-
Shuttering for Mass concrete under Strip footing ( INNER ) at Zone 1M Between PC 72-74 &PC 76-78 (as
Concreting for Large Mosque for Upper First Floor for Columns & Walls (C4,C5,C1,C1B,W5) , Axis C-E, 2-5
Concreting For Columns at North Administration Building First Floor Zone 2R As Highlighted Axis 02B
Shuttering for Cafeteria (undercroft level) Wall (W 16, 17, 18) as highlighted, (W16 from 863.45 upt
Concreting for Diaphragm wall (1st part) foundationat zone 1E Axis 01M (As Highlighted)
Concreting for Diaphragm wall foundation (4) & strip footing (3) at zone 1E Axis 01P (As Highlighted)
Concreting for Mass concrete under Strip footing (outer) at Zone 1M Between PC 71-73-75-77 (as highl
Antitermite under Mass concrete under Strip footing (outer) at Zone 1M Between PC 71-73-75-77 (as h
Concreting for walls (W16, 17, 18) Undercroft at CAFETERIA zone 2A (as highlighted) upto 863.45
Inspection and Compaction test for 1st layer Backfilling to create slope for Devonian Garden (as highlig
Inspection and compaction test of Back filling for 6th and 7th Layer of SubGrade for Infill wall and Bu
Inspection and Compaction test of Back filling for 3rd and 4th Layer of SubGrade for Retaining Wall for
Inspection and Compaction test of Back filling for 2nd and 3rd Layer of SubGrade Between Infill Wall (ou
Surface Preparation Prior Back filling Between Infill wall Vertical and Inclined BO 121- BO 122 Zone 2
Level and Location for first floor TIP Zone 1A Axis 01A (as highlighted) Level 873.05
Shuttering and Concreting for Energy Center Internal Column (neck) at Axis 7/D-G , 8-10/D-H , 11-12/ D
Level and Location for ( 1st span ) Beam of Diaphragm wall at zone 1E , Axis 01P (As Highlighted) upto
Shuttering and Concreting for Energy Center, Beam Grid 18-30/R (As Highlighted) at Level 878.50
Geotextile and 50mm Screed for Under Strip Footing between ( PC 66-68 & 70-72 ) at Zone 1L (As Highli
Single Layer of 4mm thick Modified Bituminous WaterProofing Membrane for Under Strip Footing betwe
Concreting for Kicker of Infill wall for Zone 1A between Axis 01C-01D (PC 5-7) (as highlighted) 869.10
Shuttering for Front Canopy Foundation at Zone 6 Axis 0101C, 01D, 01E, 01F (as highlighted) TOC 865.0
Steel reinforcements for Front Canopy Foundation at Zone 6 Axis 0101C, 01D, 01E, 01F (as highlighted)
Concreting for Front Canopy Foundation at Zone 6 Axis 0101C, 01D, 01E, 01F (as highlighted) TOC 865.0
Surface Preparation and Solvent base Primer Coating for Under Strip Footing between ( PC 66-68 & 70-7
Installation and Survey Report for Location and Levels of Anchor bolts for Front Canopy foundation at Z
Protection Layer of 4mm thick Bituminous Protection Board for Retaining wall side , Top and Side of fo
Shuttering for Diaphragm wall (1st part) foundationat zone 1E Axis 01M (As Highlighted)
Shuttering for Kicker of Infill wall for Zone 1A between Axis 01C-01D (PC 5-7) (as highlighted) 869.10
Steel Reinforcements for Kicker of Infill wall for Zone 1A between Axis 01C-01D (PC 5-7) (as highlighted
Gravel (Drainage) & Geo Textile (Filter membrane Terrain 1000) for Planting area's Between Tunnel an
Concreting for blinding of retaining wall foundation zone 5 from axis 01G upto after 01E (as highligted)
Excavation & Surface Preparation for Planting area's Between Tunnel and Boundary wall, inside Butter
Shuttering for blinding of retaining wall foundation zone 5 from axis 01G upto after 01E (as highligted)
Concrete pouring and Shuttring for Footings of Seat wall along Whispering Cave-2, Inside Sound & Lig
Protection Layer of 4 mm Thk. Bituminous Protection Board for Walls (Outer Sides) of Fountain inside
1st and 2nd Layer of 4mm thick Modified Bituminous WaterProofing Membrane for Retaining wall side ,
Surface Preparation and Solvent Base Primer Coating for Retaining wall side , Top and Side of foundati
2nd Coat Damp Proofing for Foundation of Plant room (Inner Sides), at Discovery Garden at highlight
1st Coat Damp Proofing for Foundation of Plant room (Inner Sides), at Discovery Garden at highlighte
Steel Reinforcement for first floor TIP Zone 1A Axis 01A (as highlighted) Level 873.05
Inspection for 2nd Coat Epoxy (Nitocote EP405), for All Inner Surfaces of tank Wet Well E, Inside Wat
Level and Location for Cafeteria (undercroft level) Wall (W 16, 17, 18) as highlighted, (W16 from 86
Installation of straight UPVC Conduit  (Dia. 32mm) for Power (CAM-153) at Boundary Wall Column between Span 74 and 75 as
Level and Location for Energy Center Internal Column (neck) at Axis 7/D-G , 8-10/D-H , 11-12/ D (as hig
Level and Location for Energy Center Beam Grid 18-30/R (As Highlighted) at Level 878.50
Level and location for Excavation for Strip footing Between PC (71-73-75-77- ) and PC ( 72-74-76-78 ) a
Level and Location for Kicker of Infill wall for Zone 1A between Axis 01C-01D (PC 5-7) (as highlighted) 8
Shuttering for first floor TIP Zone 1A Axis 01A (as highlighted) Level 873.05
Level and Location for Front Canopy Foundation at Zone 6 Axis 0101C, 01D, 01E, 01F (as highlighted) T
Concreting for first floor TIP Zone 1A Axis 01A (as highlighted) Level 873.05
Level and Location for Diaphragm wall (1st part) foundationat zone 1E Axis 01M (As Highlighted) 865.00
Concreting for Infill wall (inner) at zone 2A Between 02C-02D from 863.55 to 869.16 (As Highlighted)
Level and Location for blinding of retaining wall foundation zone 5 from axis 01G upto after 01E (as high
Concreting for Blinding of Diaphragm wall Foundation at Zone 2C Axis 02J (As Highlighted)
Level and location for Excavation for Retaining wall Foundation at Zone 5 at axis 01G - (after) 01E (As H
Shuttering for Devonian Garden Foundation at zone 2M ,Axis 03S,03T,03U (As Highlighted) TOC 871.00
Level and Location For Columns at North Administration Building First Floor Zone 2R As Highlighted
Concreting for Mass concrete under Strip footing ( INNER ) at Zone 1M Between PC 72-74 & PC 76-78(as
Concreting for Devonian Garden Foundation at zone 2M ,Axis 03S,03T,03U (As Highlighted) TOC 871.00
Surface Preparation and Solvent base primer for MCPE 3 inner wall & counter fort and tunnel wall from
Level and Location for Foundation of Retaining wall at Axis 01U-01W (as highlighted) Zone 2 & 3
Level and Location for COLUMNS C2 & C3 at Zone 2N Child Care ( As Highlighted) (C2 -4 nos) (C3 -1 no)
Level and Location for Infill wall (inner) at zone 2A Between 02C-02D from 863.55 to 869.16 ( As Highligh
Inspection and Compaction test for 1st of 2nd layer Subgrade backfilling at Strip footing zone 2E betwe
Surface Preparation Prior Back filling for Infill wall and Butress ( Outer ) zone 2R 2Q AXIS 02BC-02AW (A
Steel Reinfocements for Foundation of Retaining wall at Axis 01U-01W (as highlighted) Zone 2 & 3
Shuttering for Foundation of Retaining wall at Axis 01U-01W (as highlighted) Zone 2 & 3
Concreting for MCPE 2 Roof slab at Zone 2K axis 03E to 02X (As Highlighted) TOC 875.974 & 875.850
Steel Reinfocements for Diaphragm wall foundationat zone 1E Axis 01P (As Highlighted)
Shuttering for Blinding of Diaphragm wall Foundation at Zone 2C Axis 02J (As Highlighted)
Shuttering and Concreting for Energy Center, Beam at level 875.35 Grid 0-4/C-A (As Highlighted)
Shuttering and Concreting for Columns of Energy Center at Grid 0-1/C (1 no ) Level 874.85 (As Highlight
Shuttering for Diaphragm wall ( 2nd Span ) Vertical Wall at zone 1E Axis 01P (As Highlighted) upto Level
Steel reinforcements for Cafeteria (undercroft) Wall (W6 ,W7) , Zone 2A Axis 02A-02B , W6 from 863.4
Concreting for Diaphragm wall ( 2nd Span ) Vertical Wall at zone 1E Axis 01P (As Highlighted) upto Level
Steel Reinforcements for Devonian Garden Foundation at zone 2M , Axis 03S,03T,03U (As Highlighted)
Surface Preparation Prior to start Cementitious Water Proofing & Stone Cladding For Zone 2D Infill wal
Surface Preparation and Solvent Base Primer Coating for Retaining wall side , top of foundation and wa
1st and 2nd Layer of 4mm thick Bituminous WaterProofing Membrane for Retaining wall side , top of f
Protection Layer of Geotextile & 50mm Screed Above Foundation of Retainig wall From Axis 02M upto 0
2nd Coat Damp Proofing for Foundation of Plant room (Inner Sides), at Maze Garden, as highlighted a
Protection Layer of 4mm thick Bituminous Protection Board for Retaining wall side , top of foundation
Inspection for Installation of MV Line Junction Pit - C/MV/12, G/MV/10, H/MV/05 - as highlighted
1st Coat Damp Proofing for Foundation of Plant room (Inner Sides), at Maze Garden, as highlighted ar
Surface preparation prior to Cementitiuos water proofing & Stone Cladding for Wall (Outer Face) of B
1st Coat Cementitious Water proofing for Wing Walls (Inner Side) (Upto 15cm above FGL) of SBC-07 (B
Inspection & Compaction tests of 3rd (Final) Layer (Sub-grade) Backfilling for Fountain 2 (Inner) (2 no
Inspection & Compaction tests of 1st Layer (Sub-grade) Backfilling (Out of 3 layers) along the Bounda
Sand Cover and Protection for Irrigation Lines (63 dia.) from Outer Canopy 1 to Outer Canopy 3 (Outer
Concrete pouring for Blinding under Decant Sump-D1 at Boat garden, inside Water Garden as highli
Installation of Main Fire Water Pipes (200mmØ-UPVC-Class-5)From Point (648366.454 East & 2713877
Installation of Main Potable Water Pipes (75 mmØ-UPVC-Class-5) at Crescent - From Point (648272.5
Inspection of Formwork and Concrete pouring for footing of Cesspool-1 at Zone-K - as highlighted
Inspection of Sand bedding under pipe for Heating and Chilled Water Line at Zone-G including Branch - A
Inspection and Compaction test for backfilling Sub-grade 6th Layer (6 of 9) for SBC-07 - including Wing w
Inspection of Excavation for Storm Water Line from Outfall E to Wadi at Zone-3 -As Highlighted (RED LIN
Inspection of Blinding Concrete under LV Line Pit - G/LV/18, G/LV/22, G/LV/58, G/LV/13, G/LV/20 at Zone
Surface Preparation prior to Paint for Ceilings (C1) Inside Vehicle management, Metal Works, Elec
Plaster Guide Points & Accessories Prior to Plastering for all walls (All sides), at 1st & 2nd Floors Ins
Inspection of Excavation for Tree Pit (22No's) as Details D-38-1- as highlighted
Surface preparation prior to Waterproofing for Wall (All sides) of Fountain (3), inside Physic Garden a
Concrete Pouring & Shuttering for Fountain 2 (Inner) (4 nos), Inside Physic Garden as highlighted area
Inspection for Installed Gabions inside Tunnel of Butterfly Garden , as Highlighted area in attached D
Inspection of Backfilling Soil Mix (70%Sand, 10%Sweet Soil, 10% Organic material, 10% Perlite) for Tree P
Concrete Pouring for Blinding under Low current Handholes of (MH/WG/LC/10) and (MH/WG/FA/17),
Excavation & Blinding Levels for Low current Handholes of (MH/WG/LC/10) and (MH/WG/FA/17), insi
Concrete Pouring for Blinding under Electrical Handhole of Emergency (MH/WG/EM/16), Inside Geyser
Excavation & Blinding Levels for Electrical Handholes of Emergency (MH/WG/EM/16), Inside Geyser Ga
Inspection and Compaction test for backfilling Sub-base 1st Layer (1 of 1) above Sub-grade for SBC-07 Wi
Inspection and Compaction test for backfilling Sub-grade 2nd Layer (2 of 3) for SBC-07 Wing wall (inner s
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 9) for SBC-07 Wing wall (inner s
Concreting for 4th layer Mass Concrete under Central Bridge Abutment foundation zone 4 (as highlig
Level and Location for Infill Wall ( inner ) (1st stage ) at Zone 1D Axis 01J-01K ( As Highlighted)
Steel reinforcements for COLUMNS C2 & C3 at Zone 2N Child Care (as highlighted) (C2 -9 nos) (C3 -1 no
Inspection and Compaction test for3rd and 4th layer (gravel) Backfilling for Between Tunnel Wall and S
Concreting for 3rd Layer mass Concrete at Diaphragm wall Foundation at Zone 1E Axis 01M (5 Footings a
"Inspection of Grouting (Horizontal & Vertical Joints) for Rock Boulder - RB-250 for All Layers"
"Inspection of Grouting (Horizontal & Vertical Joints) for Rock Boulder - RB-249 for All Layers"
"Inspection of Grouting (Horizontal & Vertical Joints) for Rock Boulder - RB-248 for All Layers"
"Inspection of Grouting (Horizontal & Vertical Joints) for Rock Boulder - RB-237 for All Layers"
Inspection of Backfilling Gravel 1st Layer (1 of 1) and Geotextile for Tree Pit (59No's) as Details D-38-1-
Inspection of Excavation for Sub-station - R1 at Zone-C - as highlighted
Inspection of Excavation for Heating and Chilled Water Line at Zone-G including Branch - As highlighted
Inspection of Excavation for LV Line from B/LV/18 to R1/P-FPI and B/LV/55 to B/LV/40 at Zone-B&C i
Surface Preparation prior to start backfilling for Non potable water line Pit POC-45, POC-46 and NPW-IS
Inspection and Compaction test for backfilling Sub-grade 5th Layer (5 of 9) for SBC-07 - including Wing w
Antitermite for ETFE PUMP ROOM under blinding zone 2M (as highlighted) at CRESCENT, KAIG3-SCR
Antitermite for plain concrete for internal foundation between axis 02-AB to 02-AZ zone 2R (as high
'Pipe Installation (Dia 600mm PP Ø- UPVC Pipes-Class 4) for Storm Water pipe Out Fall-E From (MH-E-0
'Bedding of Gravel 3/8" and Geotextile surrounding in pipes (Dia 600mm PP Ø- UPVC Pipes-Class 4) fo
'Warning Tape For Inspection Of Pipe Installation For Irrigation ROW Sub-mainline Including Branc
Installation of UPVC conduit (dia. 75mm) Low Current Ductbank (TELECOM) in between Manholes (MH/
Installation of UPVC conduit (dia. 75mm) Low Current Ductbank (Fire & Security) in betwween Manhol
Installation of straight PVC Conduit (Dia. 25mm) and Boxes for Voice and Data (WIFI) at Site Tower No
Installation of straight PVC Conduit (Dia. 25mm) and Boxes for Fire Alarm (Speaker, Break Glass, Fla
Installation of PVC Conduit (Dia.25mm) & Boxes for Fire Alarm (Flash Beacon) at Chiled Care Ground
Installation of PVC Conduit (Dia.25mm) & Boxes for Fire Alarm (Flash Beacon) at South Restaurant Gr
Installation of PVC Conduit (Dia.25mm) & Boxes for Voice Data (WIFI) at Chiled Care Ground Floor Cr
Installation of PVC Conduit (Dia. 25mm) and Boxes for Voice & Data (DATA & Telephone) at the North
Installation of straight PVC Conduit (Dia. 25mm) & Boxes for Lighting System (LED W5, LED W5/E) at Fi
Installation of straight PVC Conduit (Dia. 25mm) & Boxes for Power System (Socket Outlet) at First Fl
Installation of straight PVC Conduit (Dia.32mm) & boxes for Power (Socket Outlet) in the Promenade
Mechanical Pipe sleeve Installation ,Infill Wall outer between Axis (01/2&01C to 01D) At Crescent
Inspection Of Pipe Installation For Non-Potable Water (Irrigation Main Line); (63&50 mmØ- UPVC-Cla
Inspection Of Pipe Installation For Irrigation ROW Mainline (90mmØ- UPVC-Claas-5 ); As per High li
Inspection for Laying of Red Tiles and Warning Tape above the pipe for MV Line from D/MV/04 to D/M
Inspection of Sand bedding under pipe for MV Line form C/MV/43 to D/MV/13 at Zone-C&D - as highligh
Inspection and Compaction test for backfilling Sub-grade 2nd Layer (2 of 2) between Chilled water line
Inspection and Compaction test for backfilling Sub-grade 4th Layer (4 of 4) for Chilled Water Line at Zon
Inspection for Installation of Non-Potable Water Line Pit - NPW-ISC-29, POC-24, POC-25, POC-26 at Zone
Inspection of Excavation for RO Water Line at Zone-6 - As highlighted
Inspection of Excavation for LV Line at Zone-6 including Pit - PC/LV/183, PC/LV/101, PC/LV/163, PC/LV/
Inspection of Excavation for LV Line at Zone-6 including Pit - PC/LV/103, PC/LV/104, PC/LV/106 - as high
Excavation and Surface preparation for Decant Sump-D1 at Boat garden, inside Water Garden as highl
Excavation and Bed preparation for Sub Surface Drainage Pipes (dia 110 mm PP) (for Trees) Along 2nd
Excavation for Potable Water Line at Zone-6 - as highlighted
Sand Bedding for Low Current Lines (MH/WG/LC/04 to 11 to 10), Fire Alarm & Security (MH/WG/FA/06 t
Excavation for Fire Water Line at Zone-6 - as highlighted
Sand Bedding for Electrical Lines of Emergency (MH/WG/EM/06 to 17 to 16), Inside Geyser Garden, at
Concrete Pouring for Blinding under Foundation of Mechanical Room, at Grid (F-H/10-11), at Manage
Coordinates and Levels of Blinding under Decant Sump-D1 at Boat garden, inside Water Garden as hig
Inspection of Excavation for Non-Potable Water Line at Zone-6- as highlighted
Coordinates & Levels for Blinding under Foundation of Mechanical Room, at Grid (F-H/10-11), at Ma
Installation of straight UPVC Conduit (Dia. 160mm) Medium Voltage Ductbank no. HH/D-MV/12 (H/MV
Surface Preparation prior to start backfilling for Parking Area @ Zone-G - as highlighted
Installation of straight PVC Conduit (Dia. 25mm) & boxes for Lighting System (LED W13) at Chiled Ca
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 2) between Chilled water line
Installation of straight PVC Conduit (Dia. 25mm) & boxes for Power System (Socket Outle) at the Lar
Water Test after Membrane Water proofing for wet area inside Toilets (GF-5041 & 5042) Disabled T
Inspection and Compaction test for Sub-base 1st Layer (1 of 2) for Car Park-H (CPH3 - ST.0+020 to 0+140
2nd Coat Bituminous Damp Proofing for Footing & Kicker (Outer faces) of Boundary Wall, Span 76 to 8
Installation of straight UPVC Conduit (Dia. 75mm) Low Voltage Ductbank Emergency from (MH/WG/E
1st Coat Bituminous Damp Proofing for Footing & Kicker (Outer faces) of Boundary Wall, Span 76 to 89
Installation of straight UPVC Conduit (Dia. 75mm) Low Voltage Ductbank from (MH/WG/LV/38 to MH/
Inspection of Excavation for Tree Pit (39No's) as Details D-38-1- as highlighted
Installation of straight UPVC Conduit (Dia. 160mm) Medium Voltage Ductbank no. CH/D-MV/02 (C/MV/
Inspection of Grouting (Horizontal & Vertical Joints) for Rock Boulder - WRB-27 for All Layers
Concrete Pouring for Screed protection with Geo Textile on Blinding of Decant Sump-D4 Inside Water
Single layer 4mm thick modified bituminous waterproofing membrane for Walls (Outer Sides) of Fount
Installation of PVC Conduit (Dia.25mm) & Boxes for Fire Alarm (Flash Beacon) at the Large Mosque Fi
Inspection and Compaction test for NGL of Parking H (CPH-4 - ST. 0+140 to 0+120) at Zone-G - as highlig
Inspection and Compaction test for backfilling Sub-grade 4th Layer (4 of 9) for SBC-07 - including Wing w
Concreting for Blinding of Diaphragm wall strip footing at Zone 2N Axis 02Q (as highlighted)
Installation of EMT conduit and Box for Lighting ( G1, G1/CE, A, Switch & Exit Light) at Manageme
Installation of UPVC conduit (dia.160mm) Low Voltage Ductbank (Submain Cable) no.BB/D-LV/60 in betw
Installation of UPVC conduit (dia.75mm) Low Voltage Ductbank (Normal Light & Small Power Ckt.) in
Installation of UPVC conduit (dia.75mm) Low Voltage Ductbank (Emergency) in between Manholes
'Bedding of Gravel 3/8" and Geotextile Surrounding Pipe Installation of Trees Sub-Surface Drainage
Pipe Installation of Trees Sub-Surface Drainage (Main Line & Branches) Pipes; ( Perforated110 mmØ
Installation of UPVC conduit (dia. 110mm) Low Current Ductbank (TELECOM) no. BB/D-TL/28 in between
Installation of UPVC conduit (dia. 110mm) Low Current Ductbank (Fire & Security) no. BB/D-FS/30 in
Inspection Of Pipe Installation For Irrigation ROW Sub-Mainline (110&63&50mmØ- UPVC-Claas-5 ); A
Installation of UPVC conduit (dia. 75mm) Low Current Ductbank (Fire & Security) in between Manho
Installation of UPVC conduit (dia. 75mm) Low Current Ductbank (TELECOM) in between Manholes (MH
Gravel (Drainage) & Geo Textile (Filter membrane Terrain 1000) for Tree Pits (33 no's), inside Butterf
Excavation and Bed preparation for Sub Surface Drainage Pipes (CP 160mm and branch 110 mm PP) (fo
Concrete Pouring for Blinding under Low current Handholes of (MH/WG/LC/11) and (MH/WG/FA/18),
Inspection and Compaction test for backfilling Sub-grade 3rd Layer (3 of 4) for Chilled Water Line at Zon
Concrete Pouring for Blinding under Electrical Handhole of Emergency (MH/WG/EM/17), Inside Geyser
Inspection and Compaction test for backfilling Sub-grade 5th & 6th Layer (5&6 of 6) around SBC (done by
Excavation for Low Current Lines (MH/WG/LC/04 to 11 to 10), Fire Alarm & Security (MH/WG/FA/06 to
Excavation & Bed Preparation for Electrical Lines of Emergency (MH/WG/EM/06 to 17 to 16), Inside G
"Inspection of Grouting (Horizontal & Vertical Joints) for Rock Boulder - RB-080 for All Layers"
Excavation & Blinding Levels for Low current Handholes of (MH/WG/LC/11) and (MH/WG/FA/18), insi
"Inspection of Grouting (Horizontal & Vertical Joints) for Rock Boulder - RB-079 for All Layers"
"Inspection of Grouting (Horizontal & Vertical Joints) for Rock Boulder - RB-083 for All Layers"
Excavation & Blinding Levels for Electrical Handholes of Emergency (MH/WG/EM/17), Inside Geyser Ga
Installation of Rock and Boulder No. WRB-27 - 4th layer (4 of 4)
Inspection for Installation of Fire Water Line Isolation Pit L/F/12 at Zone - L - as highlighted
Installation of Potable Water Line Pit L/PW/06 at Zone-L - as highlighted
Inspection of Blinding Concrete under LV Line Pit - K/LV/07, K/LV/44, K/LV/43, K/LV/09, K/LV/16, K/LV/
Inspection and Compaction test for backfilling Sub-grade 3rd Layer (3 of 9) for SBC-07 - including Wing w
Inspection and Compaction Test for backfilling Sub-grade 6th Layer (6 of 6) for Car Park Tree Pit as Deta
Surface Preparation prior to start backfilling between Chilled water line and Wadi-3 at Zone-H - As high
Surface Preparation and application of Primer on top of Blinding Concrete for Cesspool-1 at Zone-K - as
Surface preparation prior to Painting for Ceiling inside Plant room, at Maze Garden, at highlighted
Surface preparation prior to Painting for Ceiling inside Plant room, at Physic garden as highlighted
Surface preparation prior to Painting for Ceiling inside Plant room, at Discovery Garden at highlig
Concrete Pouring & Shuttering for Wall of Fountain 1 (2 no's) Between Outer Canopy 1 and 3, Inside P
Solvent Base Primer Coating prior to Membrane Water proofing for Walls (Outer Sides) of Fountain in
Excavation and Bed preparation for Sub Surface Drainage Pipes (dia 160 mm) (for Trees) At Right side
Inspection & Compaction tests of 2nd Layer (Sub-grade) Backfilling (Out of 3 layers) for Fountain 2 (In
Sand Cover & Protection for Irrigation Lines (90mm dia.) from Outer Canopy 1 to 3 (from Outer side),
Sand Cover & Protection for Water Feature Lines (Main 160 dia. HDPE) from Plant room to Outer Canopy
Primer Coating prior to Damp Proofing for Foundation of Plant room (Inner Sides), at Discovery Garde
Surface preparation and Primer prior to Damp Proofing for Foundation of Plant room (Inner Sides), at
Inspection & Compaction tests of 1st Layer (Sub-grade) Backfilling (Out of 3 layers) for Fountain 2 (In
Inspection & Compaction tests of Single Layer (Sub-Base) Backfilling for Low Current Lines (MH/WG/
Inspection & Compaction tests of Single Layer (Sub-Base) Backfilling for Electrical Lines of Emerge
Stack Boulders Installed Layers at levels +879.50 & 880.00 along Open Channel (Boundary wall Side),
Single layer 4mm thick modified bituminous waterproofing membrane for wet area inside Toilets (GF
Surface preparation prior to Waterproofing on Roof of Plant room, at Maze Garden, at highlighted ar
Installation of PVC Conduit (Dia. 25mm) and Boxes for Fire Alarm (Break Glass, Flashing Beacon & Fire
Surface preparation prior to Waterproofing on Roof of Plant room, at Physic garden as highlighted ar
Installation of PVC Conduit (Dia. 25mm) and Boxes for Voice & Data (DATA & Telephone) at the North
Installation of PVC Conduit (Dia.25mm) & Boxes for Fire Alarm (Break Glass) at Chiled Care Ground Fl
Installation of PVC Conduit (Dia.25mm) & Boxes for Security System (CAM, Door Controller) at Chiled
Surface preparation prior to Waterproofing on Roof of Plant room, at Discovery Garden at highlighted
Installation of PVC Conduit (Dia.25mm) & Boxes for Voice Data (CAM, Telephone, Data) at Chiled Car
1st Coat Cementitiuos Water Proofing for Wall (Outer Face) of Boundary wall @ Grid (7-20/Left Side),
Surface preparation prior to Cementitiuos water proofing & Stone Cladding for Wall (Outer Face) of B
Surface Preparation prior to Internal Paint (W1) for Walls Inside Vehicle management, Metal Wor
Double Layer of Block Work of 20cm outer wall and 10cm around the columns for Energy Center axis 2
Inspection and compaction test of Back filling for 1st Layer of SubGrade for Infill wall and Butress ( O
Level and location for Excavation of Diaphragm wall at zone 2C , Axis 02J (as highlighted)
Steel Reinforcements for beam of Energy Center,at Axis 28-30/R,at Level 875.50 (As Highlighted)
Concreting for Blinding under Foundation for North Watch Tower in zone 1 (as highlighted)
Protection Layer of 4mm thick Bituminous Protection Board for Strip footing (RC ) zone 2E between PC
Surface Preparation and Solvent Base Primer coating for Strip footing (RC ) zone 2E between PC 118-120
Single Layer of 4mm thick Modified Bituminous WaterProofing Membrane for Strip footing (RC ) zone
Surface Preparation and Solvent Base Primer Coating for Buttress ( BOV 64 & BOV 65 ) from Axis 866.50
Single Layer of 4mm thick Modified Bituminous WaterProofing membrane for Buttress ( BOV 64 & BOV 6
Protecion Layer of 4mm thick Bituminous Protection Board for Buttress ( BOV 64 & BOV 65 ) from Axis
Concreting for COLUMNS C2 & C3 at Zone 2N Child Care (As Highlighted) (C2 -4 nos) (C3 -1 no) Upto bot
Steel Reinforcements for ( Inner Side ) Infill Wall at Zone 2A, Axis between 02C-02B (As Highlighted) L
Steel Reinfocements for Diaphragm wall foundationat zone 1E Axis 01M (As Highlighted)
Shuttering for Infill wall (inner) at Zone 1D Axis 01J-01K (as highlighted)
Steel Reinfocements for Diaphragm wall ( 2nd Part ) Vertical only at zone 1E Axis 01P (As Highlighted) u
Steel Reinforcment for Large Mosque for Upper First Floor for Columns & Walls (C4,C5,C1,C1B,W5) , Axis
Steel reinforcements for MCPE 2 Roof slab at Zone 2K axis 03E to 02X (as highlighted) TOC 875.974 & 8
Shuttering for MCPE 2 Roof slab at Zone 2K axis 03E to 02X (as highlighted) TOC 875.974 & 875.850
concreting for Infill wall (inner) at Zone 1D Axis 01J-01K (As Highlighted)
Steel Reinforcements for Column of Energy Center, Grid 22-28/M, 29-30/R-N ( 48 nos ) upto Level 878.00
Shuttering for COLUMNS ( C2 - 4 nos) at Zone 2N Child Care (as highlighted) Upto bottom of Slab
Surface Preparation and Solvent Base Primer Coat for Devonian Garden Foundation and Wall (1st ), Zo
Single Layer of 4mm thick Modified Bituminous WaterProofing Membrane for Devonian Garden Foundati
Protection Layer of 4mm thick bituminous Protection Board for Devonian Garden Foundation and Wall
Shuttering for 3rd Layer mass Concrete at Diaphragm wall Foundation at Zone 1E Axis 01M (5 Footings an
Level and Location for 3rd Layer Mass Concrete Under Diaphragm wall Foundation at Zone 1E Axis 01M (5
Inspection and Compaction Test for 7th layer Backfilling to create slope Formation for EDPM Bedding
Inspection and Compaction Test for 1st layer Backfilling to create slope Formation for EDPM Bedding
Inspection for Installation of all Rings (Riser) and Slab for Manhole MH-L-05 and MH-L-06 (As Highlighted
Inspection and Compaction test for 1st and 2nd layer backfilling Gravel at Strip footing zone 2E betwee
Inspection and Compaction test for 1st and 2nd layer (gravel) Backfilling for Tunnel Wall and PC 142-1
Inspection for Installation of Manhole Base and Upvc Pipe Connection for Manhole MH-L-05 and MH-L-0
Inspection and compaction test 12th layer for Backfilling at MCPE2 inner axis 02AD-02AH (as highlighte
Inspection for Installation of all Rings (Riser) and Slab for - FW-A-4 & FW-A-3-A (As Highlighted)
Inspection of Blinding Concrete under Heating & Chilled Water Line Isolation Pit for H/DC/18 and H/DC/
Inspection and Compaction test for 7th & 8th layer of Backfilling at Zone 1D between PC 23-25 Axis 0
INSPECTION FOR MANHOLE BASE INSTALLATION AND UPVC PIPE CONNECTION FOR - FW-A-4 & FW-A-3-A
Inspection for application of Base Primer, 1st and 2nd coat Damp proof for Footing and Wall of Seating
Surface preparation and Solvent base primer for Above Plain Concrete in Devonian Garden, Zone 2M Ax
Single Layer of 4 mm thick Modified Bituminous WaterProofing Membrane for Above Plain Concrete in
Inspection of Sand bedding under pipe for MV Line from C/MV/01 to C/MV/37 at Zone-C - as highlight
Inspection of Sand bedding under pipe for MV Line from C/MV/06 to C/MV/09 at Zone-C - as highlight
Level and location for Excavation for Retaining wall Foundation at Zone 3 at axis 01S - 01P (As Highlight
Inspection and Compaction Test for backfilling Sub-grade 5th Layer (5 of 6) for Car Park Tree Pit as Deta
Inspection of Sand bedding under pipe for Fire Water Line at Zone-L - as highlighted (Stock Pipe# 154)
Inspection of Sand bedding under pipe for RO Water Line at Area-H Zone-L - As highlighted (Stock Pile#
Concreting for Foundation of Retaining wall at Axis 01S-01U ( from Movement Joint to Movement Joint
Inspection of Sand bedding under pipe for Potable Water Line at Zone-L - as highlighted (Stock Pile# 154
Geotextile and 50mm Screed for Above Plain Concrete in Devonian Garden, Zone 2M Axis 02AM-02AP ( A
Steel Reinforcements for ( Outer )Infill Wall at Zone 2F, Axis between 02U-02V (As Highlighted)
"Inspection of backfilling Sand 3rd Layer (3 of 4) for MV Line Pit B/MV14 at Zone- B - As Highlighted (St
Steel Reinforcements for Column Neck of Energy Center, Grid 7-8/D-G, 8/H (As Highlighted)
Inspection and Compaction test for backfilling Sub-grade 2nd Layer (2 of 9) for SBC-07 - including Wing w
Antitermite under Blinding of Foundation for North Watch Tower in zone 1 (as highlighted)
Inspection of Sand bedding under pipe for Chilled Water Line at Zone-H&L - As highlighted (Stock Pile#
Shuttering for Blinding under Foundation for North Watch Tower in zone 1 (as highlighted)
Level and Location for Blinding under Foundation for North Watch Tower in zone 1 (as highlighted)
Plastering for ETFE Pump Room # 6144 at Zone 2D Axis 02L upto Level 876.00 (as highlighted)
Plastering for ETFE Pump Room # 6146 at Zone 2D Axis 02J upto Level 876.00 (as highlighted)
Steel reinforcements For Columns C49, C36, C70, C75, C15, , C28, C59,C14, C58, C74, C27, C38, C11,
Two layer of 4mm thick modified bituminous waterproofing membrane for TIP wall (inner only) until S.O
Protection layer of 4mm thick bituminous protection board for TIP wall (inner only) until S.O.G 870.15
Pre insulated chilled Water Pipes (S&R) 200mmØ( laying ,Aligment ,Leveling and fit up) From poi
'Fire Fighting Networks Sand Cover & Pipes Protection (30 cm above Pipes). As per highlighted Area
'Warning Tape For Inspection Of Pipe Installation For Irrigation ROW mainline ; (200mmØ- UPVC-Claa
Excavation and Surface preparation for Shrubs & other area's inside Planted Bed (6) Along Boundary Wa
Excavation for Tree Pits (13 no's) inside Tunnel, at Butterfly Garden, as highlighted area in attached d
Marking & Check for coordinates of Tree Pits (13 no's) inside Tunnel, at Butterfly Garden, as highligh
Excavation and Soil preparation Prior to Backfilling for Fountain 2 (Inner) (2 nos) Inside Physic Garde
Warning Tiles & Tape on Low Current Lines (MH/WG/LC/01 to 04) and Fire Alarm & Security lines (M
Warning Tiles & Tape on Electrical Lines of Emergency (MH/WG/EM/02 to 03), between Mist & Geyser
Excavation and Bed preparation for Sub Surface Drainage Pipes (dia 110 mm PP) (for Trees) At leftsid
Inspection & Compaction tests of 3rd (final) Layer (Sub-Base) Backfilling for Water Feature Line of D
Inspection for 2nd Coat Epoxy (Nitocote EP405), for Inner Surfaces of tank of Wet Well F, Inside Wate
Inspection for 1st Coat Epoxy (Nitocote EP405), for All Inner Surfaces of tank Wet Well E, Inside Wate
Rough Coat (Spatter Dash) prior to Plastering for Walls Inside Staircase room (GF-5076) at Ground f
Solvent Base Primer Coating prior to Membrane Water proofing for wet area inside Toilets (GF-5041
Water Test after Membrane Water proofing for Wet area's inside Toilets (GF-5004, 5006, 5035, 50
Plastering for External Walls of Stair Case Room on Roof at Grid (8/F-G), on Management and Mainten
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 4) for Chilled Water Line at Zon
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 4) for Heating Water Line at Zon
Inspection of Excavation for MV Line from C/MV/01 to C/MV/37 at Zone-C - as highlighted (SCR:KAIG3
Inspection of Excavation for MV Line from C/MV/06 to C/MV/09 at Zone-C - as highlighted (SCR:KAIG3
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 1) above Red Tiles for MV Lin
Inspection of Sand bedding under pipe for Heating Water Line at Zone-H&L - As highlighted (Stock Pile#
"Inspection of backfilling Sand 2nd Layer (2 of 4) for MV Line Pit B/MV14 at Zone- B - As Highlighted (St
Inspection and Compaction Test for backfilling Sub-grade 5th Layer (5 of 5) around Potable Water Line P
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 2) above Sand Covering for RO
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 9) for SBC-07 - including Wing w
Inspection and Compaction Test for backfilling Sub-grade 4th Layer (4 of 6) for Car Park Tree Pit as Deta
Inspection and Compaction test for backfilling Sub-grade 3rd & 4th Layer (3&4 of 6) around SBC (done by
Inspection and Compaction test for Sub-base 1st Layer (1 of 2) for Car Park-H (CPH2 - ST.0+020 to 0+150
Inspection of Excavation for MV Line Pit C/MV/09, C/MV37 at Zone-C - as highlighted (SCR:KAIG3-SCR-
Inspection of Excavation for MV Line Pit C/MV/06, C/MV41, C/MV/01, C/MV/07, C/MV/27, C/MV/08, C
Inspection of Backfilling Gravel 1st Layer (1 of 1) and Geotextile for Tree Pit (59No's) as Details D-38-1-
Inspection of Excavation for Tree Pit (35No's) as Details D-38-1- as highlighted
Installation of Rock and Boulder No. WRB-27 - 3rd layer (3 of 4)
Block Work laying and St-2 for ETFE Pump Room # 6144 at Zone 2D axis 02L upto Bottom of Lintel Be
Installed Base Extrusion and Base Seal between Axis 02/AG - 02/AH.
Installation of Cable Tray for Low Current (Fire Alarm : 100mm) at Management and Maintenance
Installation of Cable Tray for Low Current (TELECOM / ICT : tag no. LC4- 500mm & LC5-600mm) at Ma
Installed ETFE Cushions (without aluminum caps) between axis 01-I/01-J.
Installed Aluminum Caps between Axis 02/H - 02/I.
Installed Aluminum Caps between Axis 02/D - 02/E.
Installation of PVC Conduit (Dia.25mm) & Boxes for Fire Alarm (Break Glass) at Chiled Care Ground Fl
Grouting (with ConbExtra GP) for installed Anchor Bolts and Plates on Pergola Columns (6 no's) at G
Concrete Pouring for Screed protection with Geo Textile for Wet area's inside Toilets (GF-5004, 5
Rough Coat (Spatter Dash) prior to Plastering of External Walls of Stair Case Room on Roof at Grid
Plastering for Parapet Wall (Inner & Top Sides) on Stair Case Room on Roof at Grid (8/F-G), on Mana
Rough Coat (Spatter Dash) prior to Plastering of Parapet Wall (Inner & Top Sides) on Stair Case Roo
Plaster Guide Points & Accessories prior to Plastering for Walls Inside Staircase room (GF-5076) at
Plaster Guide Points & Accessories prior to Plastering of Parapet Wall (Inner & Top Sides) on Stair
Inspection of Grouting (Horizontal & Vertical Joints) for Rock Boulder - WRB-26 for All Layers
Installation of Rock and Boulder No. WRB-27 - 2nd layer (2 of 4)
Installation of Rock and Boulder No. WRB-27 - 1st layer (1 of 4)
Inspection for Blinding Concrete under MV Line Pit H/MV/31, H/MV/01 and L/MV/10 - as highlighted
Surface Preparation prior to start backfilling Sub-base for Parking Area @ Zone-G - as highlighted
Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 6) for Car Park Tree Pit as Deta
Inspection for Installation of Non-Potable Water Line Pit - POC-07, POC-08, POC-11, POC-39 at Zone B, G
Inspection of backfilling Sand 1st Layer ( 1 of 4) for MV Line Pit B/MV14 at Zone- B - As Highlighted (Sto
Inspection of Sand bedding under pipe for LV Line from K/LV/23 to K/LV/07 at Zone-K - as highlighted (
Inspection of Excavation for MV Line Pit - H/MV31, H/MV/01 & L/MV/10 at Zone-H&L - as highlighted
Inspection of Sand bedding under pipe for Heating and Chilled Water Line at Zone-B - As highlighted (St
Inspection and Compaction Test for backfilling Sub-grade 4th Layer (4 of 5) around Potable Water Line P
Inspection for Casting Blinding Concrete under Manhole - MH-L-05, MH-L-06 - as highlighted
Inspection of Excavation for Storm Water Line from Outfall E to Wadi at Zone-3 - As Highlighted
Surface Preparation prior to start backfilling for SBC-07 - including Wing wall (other side) - as highlighte
Inspection and Compaction test for backfilling Sub-grade 9th layer (9 of 9) for SBC-07 - including Wing w
Inspection and Compaction test for backfilling Sub-grade 1st & 2nd Layer (1&2 of 6) around SBC (done by
Inspection of Excavation for Chilled Water Line at Zone-H&L including Pit H/DC/40 and H/DC/39 - As hig
Inspection of Excavation for Heating Water Line at Zone-H&L - As highlighted
Pre insulated chilled Water Pipes (S&R) 400mmØ & 200mmØ ( laying ,Aligment ,Leveling and fit up)
Installation of straight PVC Conduit (Dia. 25mm) for Power System (Socket Outle) at Chiled Care Grou
Steel Reinforcements for Tunnel 1 wall part-C (as Highlighted) Zone 2H 875.00
Level and Location for Buttress Head at BOI, BOV, 57 BII, BIV 57, 58 (as highlighted) at Zone 1P (KAIG3
Sand Bedding for Irrigation Sub-Main line Distribtion (50 & 110 mm), Between Boat Garden Boulders
Excavation for Tree Pits (20 no's), inside Butterfly Garden, as highlighted area in attached drawing's.
Marking & Check for coordinates of Tree Pits (20 no's), inside Butterfly Garden, as highlighted area i
Single layer 4mm thk Modified Bituminous Water Proofing Membrane on Blinding of Decant Sump-D4 I
Solvent Base Primer Coating prior to Membrane Water proofing on Blinding of Decant Sump-D4 Inside
Inspection of Sand bedding under pipe for RO Water Line at Zone-6 - As highlighted (Stock Pile# 154)
Inspection of Sand bedding under pipe for Potable Water Line at Zone-6 - as highlighted (Stock Pile# 154
Inspection of Sand bedding under pipe for Fire Water Line at Zone-6 - as highlighted (Stock Pile# 154)
Inspection of Sand bedding under pipe for Non-Potable Water Line at Zone-6- as highlighted (Stock Pile
Inspection of Sand bedding under pipe for LV Line at Zone-6 - as highlighted (Stock Pile# 154)
Inspection of Sand bedding under pipe for LV Line at Zone-6 - as highlighted (Stock Pile# 154)
Inspection of Sand Covering to protect the pipe for RO Water Line at Zone-B&G - as highlighted in the
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 6) for Car Park Tree Pit as Deta
Inspection and Compaction test for Sub-base 2nd Layer (2 of 3) for Car Park-H (CPH1 - ST.0+000 to 0+140
Inspection and Compaction Test for backfilling Subgrade 4th Layer (4 of 4) for Storm Water Line from
Inspection and Compaction Test for backfilling Sub-grade 8th Layer (8 of 14) for foul water line from
Inspection of Water Proofing Membrane above Blinding Concrete for Cesspool-1 at Zone-K - as highlight
Inspection for Installation of Non-Potable Water Line Pit - POC-46 & NPW-ISC-22 at Zone G&L - as highl
Inspection of Blinding Concrete under Cesspool-1 at Zone-K - as highlighted
Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 5) around Potable Water Line P
Inspection and Compaction test for backfilling Sub-grade 8th layer (8 of 9) for SBC-07 - including Wing w
Inspection of Sand bedding under pipe for Non-Potable Water Line at Zone-L - as highlighted (Stock Pile
Inspection of Sand bedding under pipre for Heating and Chilled Water Line at Zone-L - As highlighted
Inspection of Backfilling Soil Mix (70%Sand, 10%Sweet Soil, 10% Organic material, 10% Perlite) for Tree P
Inspection of Headwall and Stone Boulder for Outfall-G - As Highlighted
Inspection and compaction test 10th & 11th layer for Backfilling at MCPE2 inner axis 02AD-02AH (as hi
Surface Preparation Prior Back filling for Tunnel Wall and PC 142-144 for Zone 2H ,( As Highlighted) SP
Level and Location for South Small Mosque Second Floor Columns at Axis A-D & 4-5 , Zone 2B from 876.
Concreting for Large Mosque for Upper First Floor for ( 2 Columns ) C1B upto 876.50,Axis E / 3&4 Zone
Surface Preparation and Solvent Base Primer Coating for top of PC-189 (Inner Face) and BOV-BOI 122 (I
Block Work laying upto bottom of lintel beam for ETFE Pump Room # 6113 at Zone 2G axis 02W (as high
Inspection and Compaction Test for 6th layer Backfilling to create slope Formation for EDPM Bedding
Inspection and compaction test 11th layer continuation backfilling for Internal Building for Zone 1N A
Level and Location for RC strip Footing Between (PC 65-67 ), Axis 01 AG-AH , Zone1L(As highlighted)
Shuttering for Large Mosque for Upper First Floor for ( 2 Columns ) C1B upto 876.50,Axis E / 3&4 Zone
Concreting of Devonian Garden Wall at zone 2M Axis 02AL to 02AM (as highlighted) Level upto 874.80 (
Double Layer of Block Work of 20cm and 10cm Single block work from top of First Beam to Bottom of S
Solvent Base Primer Coating for Infill wall ( Outer side) at Axis 02BC-02BB-02BA-02AZ , Level ( 870.23-
Concreting for South Small Mosque Second Floor Columns at Axis A-D & 4-5 , Zone 2B from 876.650 to 8
Shuttering for South Small Mosque Second Floor Columns at Axis A-D & 4-5 , Zone 2B from 876.650 to 8
Steel Reinforcements for South Small Mosque Second Floor Columns at Axis A-D & 4-5 , Zone 2B from 8
Concreting for South Small Mosque Staircase ( Step , Riser , Landing ) from ground to 1st Floor, zone
Protection Layer of 4mm thick Bituminous Protection Board for Infill wall ( Outer side) at Axis 02BC-0
Single Layer of 4mm thick Modified Bituminous WaterProofing Membrane for Infill wall ( Outer side)
Protection Layer of 4mm thick Bituminous Protection Board for Butress ( BOI 128- BOI 127- BOI 126-BO
Single Layer of 4mm thick Modified Bituminous WaterProofing Membrane for Butress BOI 128- BOI 127-
Solvent Base Primer Coating for Butress ( BOI 128- BOI 127- BOI 126-BOI 125 ) at Axis 02BC-02BB-02BA
Protection Layer of 4mm thick Bituminous Protection Board for Butress ( BOI 124- BOI 123- BOI 122-
Single Layer of 4mm thick Modified Bituminous WaterProofing Membrane for Butress ( BOI 124- BOI 12
Solvent Base Primer Coating for Butress ( BOI 124- BOI 123- BOI 122-BOI 121 ) (Outer side )at Axis 0
Protection Layer of 4mm thick Bituminous Protection Board for Infill wall( Outer side) at Axis 02AZ-0
Single Layer of 4mm thick Modified Bituminous WatetrProofing Membrane for Infill wall( Outer side)
Solvent Base Primer Coating for Infill wall( Outer side) at Axis 02AZ-02AY-02AX-02AW, Level ( 870.79-
Cementitious Waterproofing for Under Foundatin of Retaining wall (wall) at Axis 01S to 01W Zone 2 (As
Surface Preparation and Solvent Base Primer Coating for Under Foundatin of Retaining wall (wall) at Ax
First Layer of 4mm thick Modified Bituminous WaterProofing Membrane for Under Foundatin of Retainin
Surface preparation prior backfilling at Strip footing zone 2E between PC 118-120 (as Highlighted)
Concreting for Infill wall for Zone 2A, 2B between Axis 02-1, 02-2 02D (AS HIGHLIGHTED)
Concreting for Large Mosque Column for lower first (1st) floor C2C, C2A, C3A, Axis C-6, C1-6, D-6, D-5.1
Protection Layer of 4mm thick Bituminous Protection Board for Under Foundatin of Retaining wall (wall
Concreting for Blinding of Diaphragm wall strip footing at Zone 2N Axis 02AQ (as highlighted) (3rd)
Concreting for Blinding of Diaphragm wall at Zone 2N Axis 02Q (as highlighted) (2nd)
Concreting for Blinding of Diaphragm wall at Zone 2N Axis 02AQ (as highlighted)
Concreting for Diaphragm wall (1st Part ) ( Vertical only ) at Zone 1E Axis 01P (As Highlighted) ( Level 868
Shuttering for Foundation of Retaining wall at Axis 01S-01U ( from Movement Joint to Movement Joint )
Steel Reinforcements for Energy Center, Beam at level 875.35 Grid 18-28,R and 0-4,C-A (As Highlighted)
Inspection ans Compaction test for 4th layer of Backfilling at Zone 1D between PC 23-25 Axis 01M-01L (A
Level and Location for Diaphragm wall (Foundation & Strip Footing ) at zone 1N Axis 01AM (as highlight
Level and Location for RC Strip Footing Between PC 67-69-71, Axis 01-2, 01AH-01AI-01AJ at Zone 1L (As
Level and Location for Diaphragm wall (1st Part ) ( Vertical only ) at Zone 1E Axis 01P (As Highlighted) ( L
Level and Location for Diaphragm wall Mass Concrete 3rd Layer of strip footing at Zone 1E Axis 01M (As
Level and Location for South Small Mosque Staircase ( Step , Riser , Landing ) from ground to 1st Floo
Level and Location for South Small Mosque Second Floor Parapet at Axis A-G & 2-8 , Zone 2B (as highli
Level and Location for Columns of Energy Center at Grid17-22M (16 nos) (As Highlighted) 868.00
Level & Location second part Roof Suspended Slab for MCPE 3 axis 02R ,03-1,03-2, Before Axis of 02-Q
Steel Reinfocements for Diaphragm wall (Foundation & Strip Footing ) at zone 1N Axis 01AM (as highlig
Shuttering for Diaphragm wall (Foundation & Strip Footing ) at zone 1N Axis 01AM (as highlighted) Leve
Concreting for Diaphragm wall (Foundation & Strip Footing ) at zone 1N Axis 01AM (as highlighted) Leve
Concreting for Cafeteria (undercroft level) Wall (W 16, 17, 18) as highlighted, (W16 from 863.45 up
Steel Reinforcement for RC Strip Footing Between PC 67-69-71 Axis 01-2, 01AH-01AI-01AJ at Zone 1L (A
Shuttering for RC Strip Footing Between PC 67-69-71 Axis 01-2, 01AH-01AI-01AJ at Zone 1L (As Highligh
Concreting for RC Strip Footing Between PC 67-69-71, Axis 01-2, 01AH-01AI-01AJ at Zone 1L (As Highligh
Shuttering for Diaphragm wall (1st Part ) ( Vertical only ) at Zone 1E Axis 01P (As Highlighted) ( Level 868
Shuttering for Diaphragm wall Mass Concrete 3rd Layer of strip footing at Zone 1E Axis 01M (As Highligh
Concreting for Diaphragm wall Mass Concrete 3rd Layer of strip footing at Zone 1E Axis 01M (As Highlig
Steel Reinforcements for South Small Mosque Staircase ( Step , Riser , Landing ) from ground to 1st Fl
Shuttering for South Small Mosque Staircase ( Step , Riser , Landing ) from ground to 1st Floor, zone 2
Shuttering for South Small Mosque Second Floor Parapet at Axis A-G & 2-8 , Zone 2B (as highlighted) TO
Concreting for South Small Mosque Second Floor Parapet at Axis A-G & 2-8 , Zone 2B (as highlighted) T
Steel Reinfocements for Foundation of Retaining wall at Axis 01S-01U ( from Movement Joint to Moveme
Pipe Installation of Sub-Surface Drainage (Main Line & Branches) Pipes; ( Perforated110 mmØ, ) at B
Shuttering and Concreting for Columns of Energy Center at Grid17-22/M (16 nos) (As Highlighted) 868.
Shuttering for Foundation & Strip Footing of Diaphragm wall at Zone 1E Axis 01P (4 Foudations) up to Ex
Inspection and compaction test 9th layer for Backfilling at MCPE2 inner axis 02AD-02AH (as highlighted
'Bedding of Gravel 3/8" and Geotextile Surrounding Pipe Installation of Sub-Surface Drainage (Main
Surface Preparation and Sand blasting prior to Plastering for Walls Inside Staircase room (GF-5076)
Surface Preparation Prior to Water proofing for wet area inside Toilets (GF-5041 & 5042) Disabled T
Single layer 4mm thick modified bituminous waterproofing membrane for wet area inside Toilets (G
Surface preparation prior to Cementitiuos water proofing & Stone Cladding for Wall (Outer Face) of B
Inspection of Thrust Blocks for Irrigation Lines (90mm dia.) from Outer Canopy 3 to 1 to 2 (from Outer
Inspection & Compaction tests of Single Layer (Sub-Base) Backfilling for Protection of Non-Potable Wat
Sand Cover for Low Current Lines (MH/WG/LC/01 to 04) and Fire Alarm & Security lines (MH/WG/FA/0
Sand Cover for Electrical Lines of Emergency (MH/WG/EM/02 to 03), between Mist & Geyser Garden, a
Sand Bedding for Electrical Line of Low Voltage, Crossing Near the Entrance of Mist Garden, inside wa
Coordinates & Levels for Fountain 2 (Inner) (4 nos), Inside Physic Garden as highlighted area in attac
Coordinates & Levels for Wall of Fountain (3), inside Physic Garden as highlighted area in attached dr
Concrete Pouring & Shuttering for Wall of Fountain (3), inside Physic Garden as highlighted area in at
Protection layer of 4mm thick bituminous protection board for MCPE 2 inner wall & counterfort upto 8
Concreting for MCPE 1 blinding under footing at Zone 2M 2N (as highlighted) axis 03R, 03-2 to 03-1 (
Steel reinforcements for Ground Bearing Slab for Cafeteria Undercroft level at Zone 2A Axis 02C-02B (a
Concreting for Ground Bearing Slab for Cafeteria Undercroft level at Zone 2A Axis 02C-02B (as highligh
Shuttering for Ground Bearing Slab for Cafeteria Undercroft level at Zone 2A Axis 02C-02B (as highligh
Level and Location for Ground Bearing Slab for Cafeteria Undercroft level at Zone 2A Axis 02C-02B (as
' 300 mm Gravel 3/8" Backfilling and Geotextileof Soak away Pipe Installation of Drain pipes (110mm
Inspection for Laying of Red Tiles and Warning Tape above the pipe for MV Line from L/MV/17 to L/MV/1
Inspection of Excavation for LV Line from K/LV/23 to K/LV/07 at Zone-K including Pit - K/LV/07, K/LV/4
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 6) for Car Park Tree Pit as Detai
Inspection for Installation of MV Line Junction Pit - B/MV/15, B/MV/02, B/MV/04, B/MV/22 - as highligh
Inspection and Compaction Test for backfilling Sub-grade 7th Layer (7 of 14) for foul water line from
Inspection and Compaction Test for backfilling Subgrade3rd Layer (3 of 3) for Storm Water Line from
Surface Preparation prior to start backfilling for MV Line Pit B/MV14 at Zone- B (As Highlighted)
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 5) around Potable Water Line P
Inspection and Compaction test for backfilling Sub-grade 7th layer (7 of 9) for SBC-07 - including Wing w
Inspection and Compaction test for Sub-base 1st Layer (1 of 3) for Car Park-H (CPH1 - ST.0+000 to 0+140
Inspection for Installation of Stone Cladding without Copping for Seating Area 1- 13 at Zone-G (As Highli
Inspection for Installation of Stone Cladding without Copping for Seating Area 1- 12 at Zone-G (As Highli
Inspection of Excavation for RO Water Line at Zone-6 - As highlighted
Excavation for Potable Water Line at Zone-6 - as highlighted
Excavation for Fire Water Line at Zone-6 - as highlighted
Inspection of Excavation for Non-Potable Water Line at Zone-6- as highlighted
Inspection of Excavation for LV Line at Zone-6 including Pit - PC/LV/108, PC/LV/110, PC/LV/111, PC/LV/1
Inspection of Excavation for LV Line at Zone-6 including Pit - PC/LV/109, PC/LV/112, PC/LV/113, PC/LV/1
Inspection for Installation of Slab for MV Line Pit - B/MV/05, B/MV/14, G/MV/33, G/MV/18, K/MV/02 at
Inspection of Concrete Pouring for Wall of MV Line Pulling Pit - C/MV/44 & D/MV/20 at Zone-C&D (As H
Inspection of Formwork for Wall of MV Line Pulling Pit - C/MV/44 & D/MV/20 at Zone-C&D (As Highligh
Inspection and Compaction Test for backfilling Sub-grade 6th Layer (6 of 6) for Car Park Tree Pit as Deta
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 5) around Potable Water Line P
Inspection and Compaction test for backfilling Sub-grade 6th layer (6 of 9) for SBC-07 - including Wing w
Inspection and Compaction Test for backfilling Sub-grade 6th Layer (6 of 14) for foul water line from
Inspection and Compaction Test for backfilling Subgrade 2nd Layer (2 of 3) for Storm Water Line fro
Surface Preparation prior to start Water proofing for Footing and Wall of Seating Area (1) at Zone-L (SA-
Inspection for application of Base Primer, 1st and 2nd coat Damp proof and Protection Board 4mm Thick
Soil Preparation under Boulder No. WRB-27 afetr cutting
Inspection of Backfilling Gravel 1st Layer (1 of 1) and Geotextile for Tree Pit (34No's) as Details D-38-1-
Inspection of Excavation for Tree Pit (24No's) as Details D-38-1- as highlighted
Inspection of Blinding Concrete under Heating & Chilled Water Line Isolation Pit for G/DH/04, G/DH/05
Inspection of Excavation for Cesspool-1 at Zone-K - as highlighted
Inspection of Excavation for Storm Water Line from MH-L-05 to Tunnel wall including Manhole MH-L-05
"Inspection and Compaction Test for backfilling Sub-Grade 2nd Layer (2 of 5) above Sand Covering for
Inspection and Compaction Test for backfilling Sub-Grade 2nd Layer (2 of 5) above Sand Covering for Fi
Inspection and Compaction Test for backfilling Subgrade 1st Layer (1 of 3) for Storm Water Line from
Inspection and Compaction Test for backfilling Sub-Grade 2nd Layer (2 of 5) above Sand Covering for P
Surface Preparation prior to start backfilling around Potable Water Line Pit for G/PW/03 - as highlighted.
Inspection and Compaction test for backfilling Sub-grade 5th layer (5 of 9) for SBC-07 - including Wing w
Inspection of Blinding Concrete under LV Line Pit - G/LV/18, G/LV/22, G/LV/58, G/LV/13, G/LV/20 at Zone
Installation of Rock and Boulder No. WRB-26 - 2nd layer (2 of 2)
Inspection of Backfilling Gravel 1st Layer (1 of 1) and Geotextile for Tree Pit (14No's) as Details D-38-1-
Inspection for Blinding Concrete under MV Line Pulling Pit H/MV/30 - as highlighted
Installation of UPVC Conduits (Dia. 110mm) for Voice & Data Ducts (Data Cables) in the Promenade &
Installation of UPVC Conduits (Dia. 110mm) for Voice & Data Ducts (ICT & Security Cables) in the Pr
Installed Aluminum Extrusion and Base Seal between Axis 02/U - 02/V.
Installed Aluminum Extrusion and Base Seal between Axis 02/T - 02/U.
Installed Aluminum Caps between Axis 02/M - 02/N.
Installed Aluminum Caps between Axis 02/L - 02/M.
Installed Aluminum Caps between Axis 02/K - 02/L.
Installed Aluminum Caps between Axis 02/J - 02/K.
Installed Aluminum Extrusion and Base Seal between Axis 02/S - 02/T.
Installed Aluminum Extrusion and Base Seal between Axis 02/S - 02/R.
Concreting for mass concrete (3rd layer) under strip footing between PC ( 152-158 )inner Zone 2K (as hi
Shuttering for mass concrete (3rd layer) under strip footing between PC ( 152-158 )inner Zone 2K (as hig
Surface Preparation and Solvent Base Primer Coating Under Duct Tunnel Slab Foundation for MCPE2 of
Installation of Two Layers of 4mm thick Modified Bituminous water Proofing Membrane Under Duct Tun
Concreting for Cafeteria undercroft AHU pad (5 nos.) , Axis 02A - 02C zone 2A (As highlighted)
Concreting for slab, Beams ( for Upper 1st Floor ) for Large Mosque, Axis C-E / 1.1-5.1 Zone 1G (As Highl
Installation of EMT conduit and Box for Fire Alarm (Break Glass,Speaker, Flashing Beacon,Fire Tel
Surface Preparation prior to Repair for Walls (All Sides) of Fountain inside Geyser Garden, inside wat
Solvent Base Primer Coating prior to Membrane Water proofing for wet area inside Toilets (GF-5004
Installation of UPVC conduit (4x110mm dia.) Low Current Ductbank (TELECOM) no.(BB/D-TL/02) in
Installation of EMT conduit and Box for Voice and Data (WIFI,Data,Telephone,CAM) at Management a
Installation of UPVC conduit (2x110mm dia.) Low Current Ductbank (TELECOM) no.(BB/D-TL/46) in be
Installation of UPVC conduit (2x110mm dia.) Low Current Ductbank (Fire and Security) no.(BB/D-
Coordinates & Levels for Wall of Fountain 1 (2 no's) Between Outer Canopy 1 and 3, Inside Physic Gar
Inspection of Levels for Dome of New Ticketing Booth # 1A, As per Attached Highlighted Drawing's.
Excavation & Bed Preparation for Electrical Line of Low Voltage, Crossing Near the Entrance of Mist G
Inspection & Compaction tests of 2nd Layer (Sub-grade) Backfilling (Out of 3 layers) for Water Featur
Excavation and Bed preparation for Irrigation Sub-Main line Distribtion (50 & 110 mm), Between Bo
Steel Reinforcement for Wall of Fountain 1 (2 no's) Between Outer Canopy 1 and 3, Inside Physic Gard
Concrete Pouring & Shuttering for Dome of New Ticketing Booth # 1A, As per Attached Highlighted D
Aluminium Flashing & Sealant on Water Proofing for foundation & Kickers of Boundary wall (Inner &
Slated Layer of 4 mm Thk. Modified Bitumenous Membrane on waterproofing of foundation & Kickers
Anti Termite application under blinding of retaining block wall strip footing Zone 2C South Admin buil
Inspection and Compaction Test for 4th of 5th layers for Retaining Wall Axis 01C-02N Zon 1A ( 4th of 5
Steel Reinforcements for Slab on grade for Large Mosque ZONE 1G (as highlighetd) at grId (5 to 6 & C to
Protection layer of Geotextile and Screed under Strip Footing between PC 97-99 (as highlighted) Zone 2
Aluminum Cap Installation between Axis 02/AO - 02/AP.
Shuttering for Promenade Bridge Abutment RETAINING wall at Grid 1P (as highlighted)
Aluminum Cap Installation between Axis 02/AN - 02/AO.
Aluminum Cap Installation between Axis 02/AM - 02/AN.
Aluminum Cap Installation between Axis 02/AL - 02/AM.
Surface preparation & Base primer coating for RC Strip Footing between PC 150-152 (as highlighted) Zo
Aluminum Cap Installation between Axis 02/AR - 02/AS.
Steel reinforcements for Cafeteria (undercroft) Wall (W 19) as highlighted, upto 869.100 zone 2A (KA
Base Seal and Aluminum Extrusion Installation between Axis 01/D - 01/E.
Shuttering for Cafeteria (undercroft) Wall (W 19) as highlighted, upto 869.100 zone 2A (KAIG3-SCR-CF-
Level and Location for Cafeteria (undercroft) Wall (W19) as highlighted, upto 869.100 zone 2A (KAIG3
Shuttering for Diaphragm wall (Foundation) at zone 1E Axis 01P (as highlighted) TOC 866.00 & 866.50
Concreting for Diaphragm wall (Foundation) at zone 1E Axis 01P (as highlighted) TOC 866.00 & 866.50
Level and Location for Diaphragm wall (Foundation) at zone 1E Axis 01P (as highlighted) TOC 866.00 &
Steel Reinforcements for Infill Wall ( inner ) at Zone 1D Axis 01J-01K (As Highlighted)
Single layer of 4mm thick modified bituminous waterproofing membrane for Infill wall (inner side) at
Surface Preparation and Solvent base primer for MCPE 2 inner wall & counterfort from 869.00 to 871.00
Two Layers of 4mm thick Modified Bitumonous waterroofing membrane for MCPE 2 inner wall & counter
Surface Preparation and Solvent base primer for MCPE 2 inner wall & counterfort from 869.00 to 871.
Two Layers of 4mm thick Modified Bituminous WaterProofing Membrane for MCPE 2 inner wall & count
Protection Layer of 4mm thick Bituminous Protection Board for MCPE 2 inner wall & counterfort from
Installation of PVC Conduit (Dia.25mm) & Boxes for Security System (CAM) at the Large Mosque Groun
Protection layer of bituminous protection board for Infill wall (inner side) at BOI 121-122, BOV 121-1
Installation of PVC Conduit (Dia.25mm) & Boxes for Voice and Data (WIFI, CAM) at the Large Mosque
Inspection of Rush Coat (spatter dash) for ETFE Pump Room # 6144 at Zone 2E Axis 02L upto Level 876.0
Inspection of Rush Coat (spatter dash) for ETFE Pump Room # 6146 at Zone 2D Axis 02J upto Level 876.0
Shuttering, Shear Connector and Scaffoldings for RING BEAM Zone 1F (OUTER) Axis 01-2, 01P to 01S (as
Level and Location for Energy Center (27nos) columns at Grid 0-7 / I-L,upto Level 878.00 (As Highlighted
Level and Location for Columns of Energy Center at Grid 27-30/R (10 nos) upto Level 878.00 (As Highlig
Shuttering and Concreting for Columns of Energy Center at Grid 27-30/R (10 nos) upto Level 878.00 (As
Inspection and Compaction Test for 5th layer Backfilling for Energy Center 2 (As Highlighted) Zone 5A A
Concreting for Wall 20 & 21 at Zone 1N & 1P internal buildings axis 01AR (as highlighted) TOC 869.10
Installation and Survey Report for Location and Levels of Retaining wall (3 nos) front canopy Corbel An
Steel Reinforcement for RC strip Footing Between (PC 65-67 ), Axis 01 AG-AH , Zone1L(As highlighted)
Concreting for RC strip Footing Between (PC 65-67 ), Axis 01 AG-AH , Zone1L(As highlighted)
Shuttering for RC strip Footing Between (PC 65-67 ), Axis 01 AG-AH , Zone1L(As highlighted)
Steel Reforcement for Diaphragm wall (1st Stage ) ( Level 868.50 ) Vertical only at Zone 1FAxis 01P (as h
Steel Reinfocements for Retaining wall front Canopy Corbel ( 3 nos ) Axis 01I , 01H, 01G (as highlighted)
Shuttering for Retaining wall front Canopy Corbel ( 3 nos ) Axis 01I , 01H, 01G (as highlighted) Zone 4
Steel Reinforcement for Stiffner Columns and Lintel Beams for MCPE1 at zone 2M 2N , Axis 03U-03T-03S
Concreting for Retaining wall front Canopy Corbel ( 3 nos ) Axis 01I , 01H, 01G (as highlighted) Zone 4
Inspection Of Pipe Installation For Non-Potable Water (Irrigation Main Line); (40 mmØ- UPVC-Claas-5
Level and Location for Retaining wall front Canopy Corbel ( 3 nos ) Axis 01I , 01H, 01G (as highlighted) Z
Level and Location for Promenade Bridge Abutment wall at Grid 1M (as highlighted) (3rd stage)
Pre insulated chilled Water Pipes (S&R) 200mmØ( laying ,Aligment ,Leveling and fit up) From poin
Level and Location for Bridge to south tower abutments wall foundation at grid 02C Zone 7 (as highlight
Installation of Puddle Flange Pipes; (110mmØ UPVC CLASS 5) (9 Pieces) ; (Fauntain Wall) at Physic
Level and Location for Infill wall between Butress 71-72 between Gridline 2K - 2J (As highlighted) ZONE
Level and Location for 2 blinding for Foundation of Internal Buildings Zone 1N & 1P (as highlighted)
Steel Reinforcements for Infill Wall at Zone 2R between Gridline 02-2AZ - 02-2BA (as highlighted)
Concreting for First Floor Suspended Slab of Internal Building at Zone 2R axis 02AZ - 02BC (as highlighte
Geotextile and 50mm Screed Under Duct Tunnel Slab Foundation of Axis 03E-03F-03G-03H for Zone 2G 2
Single layer of 4mm thick modified bituminous waterproofing membrane for RC Strip footing Foundati
Protection layer of 4mm thick bituminous protection board for RC Strip footing Foundation of Zone 1D
Protection layer of 4mm thick bituminous protection board for Infill wall and top of Strip footing betw
Inspection and compaction test 8th&9th layer for Backfilling at MCPE2 inner axis 02AD-02AH (as highli
Inspection ans Compaction test for 3rd & 4th layer of Backfilling at Zone 1D between PC 23-25 Axis 01M
Steel Reinforcement for slab , Beams , Stairs ( fom Lower 1st to Upper 1st ) & Landings for Upper 1st Fl
Shuttering for slab, Beams, Stairs ( fom Lower 1st to Upper 1st ) & Landings for Upper 1st Floor for Lar
Level and Location for slab, Beams, Stairs ( fom Lower 1st to Upper 1st ) & Landings for Upper 1st Floor
Steel reinforcements for Cafeteria undercroft AHU pad ( 1no ) , Axis 02B zone 2A (As highlighted)
Shuttering for Cafeteria undercroft AHU pad ( 1no ),Axis 02B zone 2A (As highlighted)
Level and Location for Cafeteria undercroft AHU pad ( 1no ),Axis 02B zone 2A (As highlighted)
Level and Location for Large Mosque for Upper First Floor for ( 2 Columns ) C1B upto 876.50,Axis E / 3
Shuttering for Retaining wall (wall) at Axis 02I to 02G Zone 6 & 7 (as highlighted)
Concreting of Retaining wall (wall) at Axis 02I to 02G Zone 6 & 7 (as highlighted)
Level and Location of Retaining wall (wall) at Axis 02I to 02G Zone 6 & 7 (as highlighted)
Level and Location for center Columns of Energy Center, Grid 7-11, A upto 881.00 (As Highlighted)
Shuttering and Concreting for center Columns of Energy Center, Grid 7-11, A upto 881.00 (As Highlighte
Shuttering for retaining block wall strip footing Zone 2C South Admin building (KAIG3-SCR-GN-S-0147-00
Concreting for retaining block wall strip footing Zone 2C South Admin building (KAIG3-SCR-GN-S-0147-0
Level and Location for retaining block wall strip footing Zone 2C South Admin building (KAIG3-SCR-GN-S
Steel reinforcements for retaining block wall strip footing Zone 2C South Admin building (KAIG3-SCR-G
Shuttering & concreting for Column Neck of Energy Center, Grid 7-11, B & 4-13, K (As Highlighted)
Level and Location for Column Neck of Energy Center, Grid 7-11, B & 4-13, K (As Highlighted)
Steel Reinforcements for South Small Mosque Second Floor Parapet at Axis A-G & 2-8 , Zone 2B (as high
Inspection and compaction test 7th layer for Backfilling at MCPE2 inner axis 02AD-02AH (as highlighted
Inspection and Compaction Test for 2nd & 3rd of 6th layers for Retaining Wall Axis 01C-02N Zon 1A (2
Shuttering of Devonian Garden Wall at zone 2M Axis 02AL to 02AM (as highlighted) Level upto 874.80 (
Level and Location of Devonian Garden Wall at zone 2M Axis 02AL to 02AM (as highlighted) Level upto 8
Installation of EMT conduit and Box for Voice and Data (CAM,WIFI, Data & Telephone) at Management
Inspection for backfilling Gravel 1st Layer (1 of 1) for Storm Water Line beside Manhole MH-L-05 and M
Surface Preparation prior to start backfill gravel for Storm Water Line beside Manhole MH-L-05 and Mas
Surface Preparation prior to start backfilling for Storm Water Line between Manhole MH-L-05, MH-L-06
Inspection and Compaction Test for backfilling Sub-grade 5th Layer (5 of 14) around foul water line m
Inspection and Compaction Test for backfilling Sub-grade 4th Layer (4 of 14) around foul water line m
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 3) for Duct Bank of Telecomm
Inspection and Compaction Test for backfilling Sub-Grade 3rd layer (3 of 3) above Sand for Non potable
Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 3) above Sand for Fire water li
Inspection and Compaction test for backfilling Sub-grade 4th layer (4 of 9) for SBC-07 - including Wing w
Inspection of Sand bedding under pipe for LV Line at Zone-K - as highlighted (Stock Pile# 154)
Inspection of Sand bedding under pipe for MV Line form C/MV/21 to H/MV/28 at Zone-C&H - as highligh
Inspection and Compaction Test for backfilling Sub-grade 5th Layer (5 of 6) for Car Park Tree Pit as Deta
Inspection of Blinding Concrete under Non-Potable Water Line Pit NPW-ISC-22 at Zone-L - as highlighted
Inspection of Excavation for MV Line form B/MV05 to B/MV/14 at Zone-B - as highlighted
Installation of straight UPVC Conduit (Dia. 160mm) Medium Voltage Ductbank (H/MV/29 to H/MV/06)
Pre insulated chilled Water Pipes (S&R) 400mmØ( laying ,Aligment ,Leveling and fit up) From point
Mechanical Pipe Sleeves Installation for upper First floor At Large Mosque (Crescent 1) zone 1G; (
Installation of Main Fire Water Pipes (160mmØ-UPVC-Class-5) From PIT(F/F/10) to Point (647351.183
Mechanical Pipe sleeve Installation ,Infill Wall inner From Axis (02/C to 02/D) At Crescent 2 (Cafet
Inspection of Excavation for Tree Pit (34No's) as Details D-38-1- as highlighted
Installation of Rock and Boulder No. WRB-26 - 1st layer (1 of 2)
Installation of Rock and Boulder No. WRB-52 - 6th layer (6 of 6)
Installation of Rock and Boulder No. WRB-52 - 5th layer (5 of 6)
Installation of Rock and Boulder No. WRB-52 - 4th layer (4 of 6)
Installation of Rock and Boulder No. WRB-52 - 3rd layer (3 of 6)
Excavation & Surface preparation for Planting area Inside Outer Canopy 3, at Physic garden, as highli
"INSPECTION FOR INSTALLATION OF ALL RINGS (RISER) AND SLAB FOR MH-G-13 & MH-G-14 (As Highligh
Excavation & Surface preparation for Planting area Inside Outer Canopy 2, at Physic garden, as highli
Inspection for Installation of Heating and Chilled Water Line Pit for H/DC/18, H/DC/28 at Zone-H - As hig
Laying of Sub Base inside Sand Pits (6 no's) at Planted Beds Along Boundary Wall inside Discovery Gar
Inspection and Compaction test for backfilling Sub-grade 3rd layer (3 of 9) for SBC-07 - including Wing w
Inspection for Installed Galvanized Steel Angles along the Tunnel, at Grid (A/1-21), Inside Butterfly G
Inspection and Compaction Test for backfilling Sub-Grade 2nd layer (2 of 3) above Sand for Non potable
Surface Preparation prior to start backfilling Sub-base for Parking Area @ Zone-G - as highlighted
Steel Reinforcement for Fountain 2 (Inner) (4 nos), Inside Physic Garden as highlighted area in attach
Inspection of Excavation for Chilled Water Line at Zone-H - As highlighted
Concrete Pouring & Shuttering for Slab of New Ticketing Booth # 6A As per Attached Highlighted Draw
Inspection of Excavation for Heating Water Line at Zone-H - As highlighted
Inspection for 1st Coat Epoxy (Nitocote EP405), for Inner Surfaces of tank of Wet Well F, Inside Wate
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 3) above Sand for Fire water l
Excavation and Bed preparation for Fire Fighting Lines (Pipe dia 50 & 80 mm), inside Butterfly Garden,
Inspection and Compaction Test for backfilling Sub-grade 4th Layer (4 of 6) for Car Park Tree Pit as Deta
Inspection of Excavation for MV Line form C/MV/21 to H/MV/28 at Zone-C&H including Pit - H/MV/27 - a
Inspection of Excavation for Heating and Chilled Water Line at Zone-B including Pit B/DC/04 - As highlig
Inspection of Sand bedding under pipe for LV Line at Zone-G - as highlighted (Stock Pile# 154)
Inspection of Blinding Concrete under Fire Water Line Pit B/F/02 at Zone-B - as highlighted
Installation of PVC Conduit (Dia.25mm) & Boxes for Fire Alarm (Speaker, Smoke Detector, Voice Alar
Installation of straight PVC Conduit (Dia. 25mm) and boxes for Lighting (LED TT/CE, C1, CT, CT/CE, D
Shuttering for (2nd layer) Mass Concrete of strip Footing ( Inner ) Between (PC 66-68 & 70-72) (As highl
Concreting for (2nd layer) Mass Concrete of strip Footing ( Inner ) Between (PC 66-68 & 70-72) (As high
Level and Location for (2nd layer) Mass Concrete of strip Footing ( Inner ) Between (PC 66-68 & 70-72)
Geotextile and 50mm Screed for Above foundation of Retaining wall at Axis 01C to 02N Zone 6 & 7 (as h
Inspection of Plaster Guide Point and Accessories for ETFE Pump Room # 6144 at Zone 2E Axis 02L upto
Inspection of Plaster Guide Point and Accessories for ETFE Pump Room # 6146 at Zone 2D Axis 02J upto
1st layer of blockwork (layout) for MCPE 1 axis 03-2, between 03R to 03T (as highlighted) Zone 2M 2N
Protection layer of 4mm thick bituminous protection board for Devonian Garden Footing at Zone 2M (as
Single Layer of 4mm Thick Modified Bituminous WaterProofing Membrane for top of PC-189 (Inner Face)
Protection Layer of 4mm Thick Bituminous Protection Board for top of PC-189 (Inner Face) and BOV-BOI
Excavation and Surface preparation for Shrubs & other area's inside Planted Bed (2, 3, 4 & 5) Along B
Steel Reinforcement for Wall of Fountain (3), inside Physic Garden as highlighted area in attached dra
Inspection & Compaction tests of 2nd (Final) Layer (Sub-Base) Backfilling (Out of 2 layers) for Sub
Sand Bedding for Irrigation Sub-Main line Distribtion (50, 63, 110 mm), Between Boat Garden Boulder
Inspection & Compaction tests of Single Layer (Sub-Base) Backfilling on Warning Tape of Low Current
Inspection & Compaction tests of Single Layer (Sub-Base) Backfilling above Sand Cover of Water Featu
Excavation and Bed preparation for Irrigation Sub-Main line Distribtion (50, 63, 110 mm), Between B
"Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 5) for Storm line branch and
Inspection for Installation of MV Line Junction Pit - G/MV/23 and G/MV/04 at Zone-G - as highlighted
Surface Preparation prior to start backfilling for Non potable water line Pit ISC-14 at Zone-B - As Highlig
Inspection of Grouting (Horizontal & Vertical Joints) for Rock Boulder - WRB-50 for All Layers
Inspection and Compaction test for backfilling sub-grade 2nd Layer (2 of 6) above Gravel around Manho
Inspection of Surface Preperation prior to start backfilling for Manhole MH-G-12, MH-G-13 & MH-G-14 a
Inspection for Casting Concrete for Short Piece and Surface Preperation prior to start waterproofing
Inspection of Excavation for Non-Potable Water Line Pit NPW-ISC-22 at Zone-L - as highlighted
Inspection for Installation of all Rings (Riser) and Slab for FW-A-3-6 & FW-A-3-1 - As Highlighted
"Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 5) for MV Line Pit E/MV/01,
Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 10) around SBC-02 - Wing Wall
Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 6) for Car Park Tree Pit as Deta
Inspection of Blinding Concrete under Non-Potable Water Line Isolation Pit for NPW-ISC-06 at Zone-K -
Inspection and Compaction test for backfilling Sub-grade 2nd layer (2 of 9) for SBC-07 - including Wing w
Sand bedding for Non-Potable water line at Zone-L
Ins and FDT for backfilling SG (1 of 9) for SBC-07 including WW (one side)
Inspection and FDT of BF SG (1 of 3) above Sand for Non-Potable line pit ISC-14
Inspection and FDT of BF subgrade (1 of 3) above Sand for Fire line pit B-F-04
Installation for Fire Line Pit B-F-13
Concrete Pouring for Blinding under Fountain 2 (4 nos) Inside Physic Garden as highlighted area in at
Protection Layer of 4 mm Thk. Bituminous Protection Board for foundation & Kickers of Boundary wa
Installation of Rock and Boulder No. WRB-52 - 2nd layer (2 of 6)
Inspection for Repair by Nitomortar TC2000 Epoxy, for All Inner Surfaces of tank Wet Well E, Inside W
Sand Cover & Protection for Water Feature Line of Drain Pipe (150 mm dia) From Inside to Outside of
Inspection and Compaction Test for backfilling Sub-grade 2nd layer (2 of 2) above Sand Covering for Po
Inspection and Compaction Test for backfilling Sub-grade 2nd layer (2 of 2) above Sand Covering for Fir
Sand Cover & Protection for Non-Potable Water (Irrigation Line ) Inside Sound & Light Garden, as high
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 3) for Duct Bank of Fire & Sec
Inspection and Compaction Test for backfilling Sub-grade 1st Layer ( 1 of 3) for Duct Bank of Telecomm
Inspection of Backfilling Gravel 1st Layer (1 of 1) and Geotextile for Tree Pit (15No's) as Details D-38-1-
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 6) for Car Park Tree Pit as Deta
Warning Tiles & Tape on Low Current Lines of Telecom (from MH/ZG/TC/11 to 12 ), at Maze Garden, as
Sand Bedding for Low Current (Main) Lines for Pits (B/TL/53 to22) & (B/FS/45 to 25) Between Geyser
Sand Bedding for Low Current Lines (MH/WG/LC/14 to 15), Fire Alarm & Security (MH/WG/FA/21 to 22
Sand Bedding for Electrical Lines of Emergency (MH/WG/EM/20 to 21) & Low Voltage (MH/WG/LV/38 to
Surface preparation prior to Backfilling along the Boundary Wall (Both sides) of Span 47, (At B.O.B Le
Surface preparation prior to Backfilling along Boundary Wall (Inner & outer sides) (at Bottom of Blind
Excavation and Bed preparation for Sub Surface Drainage Pipes (dia 110 mm PP) (for Trees) Along 2nd
'Warning Tape For Non-Potable Water (Irrigation Main Line); (200 mmØ- UPVC-Claas-5 ) ; As per Hig
Installation of PVC conduit ( 2X75mm ) Low Current Ductbank (TELECOM) (from MH/WG/LC/03 to
Installation of PVC conduit ( 2X75mm ) Low Current Ductbank (Fire and Security) (from MH/W
Installation and Survey Report for Location and Levels of Anchor bolts for Front Canopy foundation at
Steel Reinforcements for Columns of Energy Center at Grid 0-1/C,17-22/M and 28-30/R (27 nos) (As Hig
Surface Preparation and Solvent base primer coating for diaphragm wall Under Foundation at zone 1N
Protection Layer of 4mm Thick Bituminous Protection Board for diaphragm wall Under Foundation at zo
Geotextile and 50mm Screed for diaphragm wall Under Foundation at zone 1N axis 01AM (As Highlighte
Concreting for Infill wall (inner) at Zone 2K between Axis 02AE-02AF (as highlighted)
Inspection of Plaster Guide Point and Accessories for ETFE Pump Room # 6141 at Zone 2E Axis 02Q upto
Inspection of Spatter dash (Rush Coat) for ETFE Pump Room # 6141 at Zone 2E Axis 02Q upto Level 876.0
Shuttering for First Floor Suspended Slab of Internal Building at Zone 2R axis 02AZ - 02BC (as highlighted
Level and Location for First Floor Suspended Slab of Internal Building at Zone 2R axis 02AZ - 02BC (as hi
Steel reinforcements for Cafeteria undercroft AHU pad (4 nos.) , Axis 02C zone 2A (As highlighted)
Shuttering for Cafeteria undercroft AHU pad (4 nos.) , Axis 02C zone 2A (As highlighted)
Level and Location for Cafeteria undercroft AHU pad (4 nos.) , Axis 02C zone 2A (As highlighted)
Inspection ans Compaction test for 1st and 2nd layer of Backfilling at Zone 1D between PC 23-25 Axis 0
Inspection and Compaction Test for 5th layer Backfilling to create slope Formation for EDPM Bedding
Level and location for Mass Concrete (3rd layer) of Diaphragm wall Foundation at Zone 1E Axis 01M (as h
Inspection of Plaster Guide Point and Plaster Accessories for Pump Room 6089 at Zone 1C axis 01I (as h
Double Layer of Block Work of 20cm outer wall and 10cm around columns for Energy Center axis 21-29,
Surface Preparation and Solvent base primer under foundation & strip footing (4 footing & 3 strip) of d
Single layer of 4mm thick modified bituminous waterproofing membrane under foundation & strip footing
Protection layer of 4mm thick bitmunous protection board under foundation & strip footing (4 footing
Geotextile and Screed under foundation & strip footing (4 footing & 3 strip) of diaphragm wall at zone 1
Inspection and Compaction for 9th & 10th Layer of 12th (continuation) backfilling at CRETACEOUS GAR
Concreting for Wall 20&21 at Zone 1N &1P internal Building Axis 01AR (As Highlighted) TOC 869.10
Inspection and Compaction test of 4th & 5th layer backfilling for Retaining wall Foundation and Abuttm
Steel reinforcements for Front Canopy Foundation at Zone 1 Axis 01Z, 01AA, 01AB, 01AC (as highlighte
Inspection and Compaction Test of 6th Layer for Backfilling at MCPE2 inner Axis 02AD-02AH (AS hIGH
Shuttering for Front Canopy Foundation at Zone 1 Axis 01Z, 01AA, 01AB, 01AC (as highlighted) TOC 865
Shuttering for Large Mosque for Upper First Floor for Columns & Walls (W1) , Axis E-F, 5-6 Zone 1G (as
Concreting for Front Canopy Foundation at Zone 1 Axis 01Z, 01AA, 01AB, 01AC (as highlighted) TOC 865
Concreting for Large Mosque for Upper First Floor for Columns & Walls (W1) , Axis E-F, 5-6 Zone 1G (as
Level and Location for Front Canopy Foundation at Zone 1 Axis 01Z, 01AA, 01AB, 01AC (as highlighted)
Level and Location for Large Mosque for Upper First Floor for Columns & Walls (W1) , Axis E-F, 5-6 Zone
Concreting of Mass Concrete Under strip Footing ( Inner ) Between (PC 66-68 , 70-72) (As highlighted)
Concreting for South Small Mosque Second Floor Suspended slab (as highlighted)
Steel Reinforcements for First Floor Suspended Slab of Internal Building at Zone 2R axis 02AZ - 02BC (as
Shuttering and Scaffolding for Ring Beam (Inner) at Zone 1A, Axis 01B-01D (as highlighted) ,
Concreting for Ring Beam (Inner) at Zone 1A, Axis 01B-01D (as highlighted) ,
Level and Location for Ring Beam (Inner) at Zone 1A, Axis 01B-01D (as highlighted), Level at 877.500
Installation and Survey Report for Location and Levels of Anchor bolts for Front Canopy Ring Beam (inn
1st Layer of Block Work layout for MCPE1,Axis 3-2,03U-03T(as highlighted) Zone 2M 2N
Shuttering for Duct Tunnel wall for MCPE 2, Axis 03G,03H,(as highlighted) Zone 2G , Level at 874.50
Concreting of Duct Tunnel wall for MCPE 2, Axis 03G,03H,(as highlighted) Zone 2G Level at 874.50
Level and Location of Duct Tunnel wall for MCPE 2, Axis 03G,03H,(as highlighted) Zone 2G Level at 874.
Shuttering for Wall 20 & 21 at Zone 1N & 1P internal buildings axis 01AR (as highlighted) TOC 869.10
Level and Location for Wall 20 & 21 at Zone 1N & 1P internal buildings axis 01AR (as highlighted) TOC 8
Steel Reinforcement for Stiffner Columns and Lintel Beams for MCPE1 at zone 2M 2N , Axis 03U-03T (ST
Shuttering for Infill wall (inner) at Zone 2K between Axis 02AE-02AF (as highlighted)
Level and Location for Infill wall (inner) at Zone 2K between Axis 02AE-02AF (as highlighted)
Installation of PVC conduit (dia. 25mm) and Box for Voice and Data (Telephone & WIFI) at the Crescent
Installation of PVC conduit (dia.25mm) for Fire Alarm (Break Glass) at Aviary Garden (Back House Entra
Installation of PVC conduit (dia.25mm) for Security (CAM,Magnetic Door Lock,Door Release Push Butt
Installation of PVC conduit (dia.25mm) for Voice and Data (CAM) at Aviary Garden (Back House Entrance
Installation of EMT conduit and Box for Voice and Data (CAM,WIFI, Data & Telephone) at Managemen
Warning Tape Installation of Fire Fighting Networks for (200mmØ-UPVC-Class-5). As per highlighted
'Warning Tape Installation of Potable Water Pipe for (65mmØ-UPVC-Class-5). As per highlighted Area
Installation of PVC conduit (dia.32mm) for Power (Isolator) at Aviary Garden (Back House Service Yard
Shuttering for 2nd Layer mass Concrete at Diaphragm wall Foundation at Zone 1E Axis 01M (5 Footings a
Mechanical Pipe sleeve Installation ,For First floor At North Administration Crescent 2 zone 2R; (U
Concreting of 2nd Layer mass Concrete at Diaphragm wall Foundation at Zone 1E Axis 01M (5 Footings an
Level and Location of 2nd Layer mass Concrete at Diaphragm wall Foundation at Zone 1E Axis 01M (5 Foo
Installation of EMT conduit and Box for Power (Twin Socket,Cleaner Socket,Fused Connection Unit
Level and location for Rock level inside energy center at grid 15-30, M-R (Mechanical Building) (as Highl
Steel Reinforcements for Column Neck of Energy Center, Grid 7-11/B (As Highlighted)
Installation of straight PVC Conduit (Dia. 25mm) & Boxes for Power System (Socket Outlet, Fused Con
Antitermite under Blinding of Diaphragm wall Foundation and Strip footing at Zone 1E Axis 01P (2 Footing
Steel Reinforcements for center Columns of Energy Center, Grid 7-11, A upto 881.00 (As Highlighted)
Inspection and Compaction Test for 4th layer Backfilling for Energy Center 2 (As Highlighted) Zone 5A A
Steel Reinforcements for Columns of Energy Center,Grid 0-7/I-L (27 nos) upto Level 878.00(As Highlight
Level and location for Excavation of Diaphragm wall foundation and Strip Footing at zone 1E Axis 01P (A
Shuttering for MCPE 2 Wall and Counter fort, axis 02AC, 03K TOC 875.55 (as highlighted) Zone 2J
Concreting for MCPE 2 Wall and Counter fort, axis 02AC, 03K TOC 875.55 (as highlighted) Zone 2J
Inspection and Compaction Test for 1st of 7th layers for Retaining Wall Axis 01C-02N Zon 1A (1st of 7t
Inspection for gravel around underground pipe at Cretaceous Garden Zone 2D 2E (as highlighted) SP#14
Steel reinforcements for Retaining wall (wall) at Axis 02I to 02G Zone 6 & 7 (as highlighted)
Concreting for Duct Tunnel Wall of MCPE 2,Axis 03E, 03F Level upto 874.50 (as highlighted) Zone 2G
Concreting of blinding for retaining block wall strip footing Zone 2C South Admin building (KAIG3-SCR-
Level and Location for Duct Tunnel Wall of MCPE 2,Axis 03E, 03F Level upto 874.50 (as highlighted) Zon
Inspection and Compaction for 7th & 8th Layer of 12th (continuation) backfilling at CRETACEOUS GARDE
Inspection and Compaction test of 2nd & 3rd Layer Back Filling for Retaining Wall Foundation and Ab
Shuttering for Duct Tunnel Wall of MCPE 2,Axis 03E, 03F Level upto 874.50 (as highlighted) Zone 2G
Level and Location of Blinding for Diaphragm wall Foundation and Strip footing at Zone 1E Axis 01P (As
Concreting of Blinding for Diaphragm wall Foundation and Strip footing at Zone 1E Axis 01P (As Highligh
Shuttering for Blinding of Diaphragm wall Foundation and Strip footing at Zone 1E Axis 01P (As Highlight
Surface Preparation Prior to start Backfilling for Jurassic Garden Zone 2G 2H, Axis 02V-02AB
' Soak away Pipe Installation of Drain pipes (110mmØ - UPVC- Class 4) including manhole (FW-A-13-4)
'Bedding of Gravel 3/8" and Geotextile Surrounding Soak away Pipe Installation of Drain pipes (110m
Shuttering for blinding of retaining block wall strip footing Zone 2C South Admin building (KAIG3-SCR-
Pre insulated chilled Water Pipes (S&R) 200mmØ( laying ,Aligment ,Leveling and fit up) From point
'Fire Fighting Networks Sand Cover & Pipes Protection (30 cm above Pipes). As per highlighted Area
'Potable Water Pipes Sand Cover & Pipes Protection (30 cm above Pipes). As per highlighted Area in
"Inspection of Grouting (Horizontal & Vertical Joints) for Rock Boulder - RB-082 for All Layers"
Inspection of Excavation for Shrubs (4 No's) at Zone-G - as highlighted
Inspection of Excavation for Tree Pit (14No's) as Details D-38-1- as highlighted
Installation of Rock and Boulder No. RB-082 (Full Boulder - 4 Layers)
"Inspection and Compaction Test for backfilling Sub-Grade 1st Layer (1 of 5) above Sand Covering for
Inspection and Compaction Test for backfilling Sub-Grade 1st Layer (1 of 5) above Sand Covering for Fi
Inspection and Compaction Test for backfilling Sub-Grade 1st Layer (1 of 5) above Sand Covering for P
"Inspection of backfilling Sand 2nd layer (2 of 2) for Non potable water line Pit ISC-14 at Zone-B - As Hi
"Inspection of backfilling Sand 2nd Layer (2 of 2) for Fire water line Pit B/F/04 at Zone-B - As Highlighte
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 6) for Car Park Tree Pit as Detai
"Surface Preparation prior to start backfilling for Car Park Tree Pit as Details D-38-1, as highlighted in
Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 3) above Sand Covering for Fir
Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 3) above Sand Covering for Fir
Shuttering and Concreting for Energy Center (7nos) columns (ext) at Grid 2-4, A upto Level 874.85 (as h
Inspection for Laying of Red Tiles and Warning Tape above the pipe for MV Line from D/MV/03 to D/M
Surface Preparation prior to start Water Proofing for MV Line Pit D/MV/31, D/MV/33, D/MV/03, D/MV/0
Level and Location for Energy Center (7nos) columns (ext) at Grid 2-4, A upto Level 874.85 (as highlighte
Inspection of Excavation for MV Line Pit C/MV/09, C/MV37 at Zone-C - as highlighted (SCR:KAIG3-SCR-
Shuttering and Concreting for Columns neck (int.) of Energy Center 2, Axis 4-6,C-H (as highlighted).
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 3) above Sand Covering for Fi
Steel Reinforcement for Duct Tunnel wall for MCPE 2, axis 03G,03H,(as highlighted) Zone 2G
Inspection for Installation of Fire Water Line Isolation Pit F/F/01 at Zone - F - as highlighted
Level and Location for Columns neck (int.) of Energy Center 2,Axis 4-6, C-H (as highlighted).
Inspection of Sand Covering to protect the pipe for Fire Water Line at Zone-B&G -as highlighted (Stock
Inspection and Compaction Test for 4th layer Backfilling to create slope Formation for EDPM Bedding
Inspection of Sand Covering to protect the pipe for Potable Water Line at Zone-B&G - as highlighted (St
"Inspection of backfilling Sand 1st layer (1 of 2) for Non potable water line Pit ISC-14 at Zone-B - As Hi
"Inspection of backfilling Sand 1st Layer (1 of 2) for Fire water line Pit B/F/04 at Zone-B - As Highlighte
Surface Preparation for Backfilling Zone 1D between PC 23-25 Axis 01M-01L (as hghlighted) SP 146
Inspection and Compaction Test for backfilling Sub-grade 4th layer (4 of 4) above Sand for Non potable
Inspection of Blinding Concrete under RO Water Line Pit ROW-ISC-17 & POC-24 at Zone-B - As highlighte
Inspection of Blinding Concrete under Potable Water Line Pit B/PW/10 at Zone-B - as highlighted
Inspection of Sand Covering to protect the pipe for Non-Potable Water Line at Zone-B&G - as highlighte
Inspection and Compaction Test for backfilling Sub-grade 6th Layer (6 of 6) for Car Park Tree Pit as Deta
Excavation for Non-Potable water line at Zone-L-near tower 4
Level and Location for blinding of retaining block wall strip footing Zone 2C South Admin building (KA
KAIG3-RFI-SW-C-8078-00 - Surface Preperation prior to start Waterproofing for SBC-03 WW (Right Side
Excavation for MV line Pit C-06,41,01,07,27,08,26- as highlighted SCR
Concreting for Infill outer wall at Crescent between axis (02-AA & 02-AB) (As highlighted) ZONE 2H
BLinding Concrete under MV line Pit G-MV-23, 04
Blinding Concrete under LV line Pit K-LV-05,14,42,10,08,41 at zone-k
Concreting for outer infill wall with counter fort at Axis 02S-02T (as highlighted) Zone 2F (KAIG3-SCR-
Inspection of Formwork & Concrete pouring for Wall of MV LIne Pit -C-17, D-MV-05
Concreting for TIP WALL upto 872.70 Axis 01A (as highlighted) Zone 1A
Surface Preperation prior to start backfilling for SBC-07 including WW (one side)
Steel Reinforcement for BUTTRESS BII 6 & 7 Zone 1B
Shuttering for Mass Concrete of strip footing at Zone 2N Between PC 180-182
Excavation for Tree pit inside Seating Area 1-10
Anti Termite application under Mass Concrete of Foundation for North Restaurant (Elevator Pit) Zone 1
Concreting of Mass Concrete for Elevator Pit at North Restaurant Zone 1N 1P (KAIG3-SCR-CO-S-0130-00)
Geotextile and Screed under Strip footing between PC 150-152 Zone 2J (as Highlighted)
Level and Location for Foundation & Strip Footing of Diaphragm wall at Zone 1E Axis 01P (4 Foudations)
Steel Reinforcement for Strip footing (RC) at Zone 1D Between PC 19-21(as highlighted)
Steel Reinforcements of Devonian Garden Wall at zone 2M Axis 02AL to 02AM (as highlighted) Level upt
Concreting for Strip footing (RC) Between PC 5-7 at Zone 1A (as highlighted)
Level and Location for Strip footing (RC) Between PC 5-7 at Zone 1A (as highlighted)
Level and Location for South Small Mosque Second Floor Suspended slab (as highlighted)
Steel Reinforcement for Duct Tunnel Wall of MCPE 2,Axis 03E, 03F Level From 871.00 to 874.50 (as hig
Coordinates & Levels of Blinding under Fountain 2 (4 nos) Inside Physic Garden as highlighted area in
Excavation and Bed preparation for Sub Surface Pipe Lines (dia 110 mm PP) Both sides along boundary
Excavation and Bed preparation for Sub Surface Drainage Pipes (dia 110 mm PP) (for Trees) Along 1st
Inspection & Compaction tests of 3rd (Final) Layer Backfilling (Sub-Grade) (Upto Bottom of Blinding le
Steel Reinforcement for Strip footing (RC) Between PC 5-7 at Zone 1A (as highlighted)
Shuttering for Strip footing (RC) Between PC 5-7 at Zone 1A (as highlighted)
Inspection of Plaster works for Pump Room 6084 at Zone 2J axis 02AD (as highlighted) From level 870.0
Concreting for Top Slab of Duct Tunnel for MCPE 1,at Zone 2M&2N , Axis 03S ( As Highlighted )TOC 874.
Level and Location for Top Slab of Duct Tunnel for MCPE 1,at Zone 2M&2N , Axis 03S ( As Highlighted )
Shuttering for South Small Mosque Second Floor Suspended slab (as highlighted)
Inspection and Compaction Test for 1st & 2nd layer of Gravel Retaining Wall Axis 01C-02N Zon 1A(3rd
Steel Reinforcement for Foundation & Strip Footing of Diaphragm wall at Zone 1E Axis 01P (4 Foudations
Concreting for Foundation & Strip Footing of Diaphragm wall at Zone 1E Axis 01P (4 Foudations) up to Ex
Inspection and Compaction test of 1st layer backfilling for Retaining wall Foundation and Abuttment at
Excavation and Surface preparation for Shrubs & other area's inside Planted Bed Along Boundary Wall
Stack Boulders Installed Layer at level +880.700, at Separate Boulder Line (Aviary garden Side), at W
Stack Boulders Installed Layer at level +880.300, at Separate Boulder Line (Aviary garden Side), at W
Inspection for Installed Low Current (Main Line) Pits (B/TL/22 & 53) & (B/FS/25 & 45) Between Geyse
Excavation for Low Current (Main) Lines for Pits (B/TL/53 to22) & (B/FS/45 to 25) Between Geyser Ga
Excavation for Low Current Lines (MH/WG/LC/14 to 15), Fire Alarm & Security (MH/WG/FA/21 to 22)
Excavation for Electrical Lines of Emergency (MH/WG/EM/20 to 21) & Low Voltage (MH/WG/LV/38 to 4
Steel Reinforcement for Dome of New Ticketing Booth # 1A, As per Attached Highlighted Drawing's.
Protection Layer of 4 mm Thk. Bitomenous Protection Board for Footing & Kicker (Inner & outer faces
Surface Preparation Prior to Water proofing for wet area inside Toilets (GF-5004, 5006, 5035, 5036
Surface Preparation Prior to Install Thermal Insulation for Inner face of Boundary wall @ Grid (18-23/
Plastering for Internal walls Inside Toilets (GF-5041 & 5042) & Disabled Toilet (GF-5043) at Grid (9-
Inspection & Compaction tests of 1st Layer (Sub-Grade) Backfilling (Out of 3 layers) for Sub surface
Completion of Stacked Boulders Wall with Grouting for Planting Beds (All Layers) at Boulder 6, along
Completion of Stacked Boulders Wall with Grouting for Planting Beds (All Layers) at Boulder 5, along
Mockup for Stone Coping on Seat walls for all External Gardens Installed Inside Butterfly Garden at h
Rough Coat (Spatter Dash) Prior to Plastering for Internal walls Inside Toilets (GF-5041 & 5042) & Di
Single layer 4mm thick modified bituminous waterproofing membrane for foundation & Kickers of Bou
Installation of straight PVC conduit (3x75mm) Low Voltage Ductbank (Emergency) (MH/WG/EM/3 to MH
Installation of PVC Conduit (Dia. 25mm) & Boxes for Lighting System (Lighting Fixture) at New Ticket
Installation of straight UPVC Conduit LV Duct (Dia. 160mm 6Pcs-sleeves) for Power and Lighting Circui
Installation of PVC Conduit (Dia. 25mm) and Boxes for Fire Alarm (Smoke Detector & Voice Alarm) at
Mechanical Pipe sleeve Installation , Draine pipe At Crescent 1, Zone 1P,1N(North Restaurant ); (di
Pre insulated chilled Water Pipes (S&R) 400mmØ( laying ,Aligment ,Leveling and fit up) From point
Check Top Levels of Slab (+2950) for New Ticketing Booth # 6A As per Attached Highlighted Drawing's
Coordinates & Levels of Wall for Fountain of Geyser Garden, inside water Garden, as highlighted area
Inspection for Repair by Nitomortar TC2000 Epoxy, for Inner Surfaces of tank of Wet Well F, Inside W
Surface Preparation prior to Repair by Nitomortar TC2000 Epoxy, for All Inner Surface of tank Wet Wel
Concrete Pouring & Shuttering for Wall of Fountain inside Geyser Garden, inside water Garden, as hig
Single layer 4mm thk Modified Bituminous Water Proofing Membrane on Blinding of Decant Sump-D4 I
Surface Preparation Prior to Waterproofing on Blinding of Decant Sump-D4 Inside Water Play garden,
Inspection for Installed Low Current Handholes and Pits, Low current (MH/WG/LC/14 & 15), Fire Ala
Inspection for Installed Electrical Handholes of Emergency (MH/WG/EM/20 & 21) & Low Voltage (MH/
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 3 layers) for Fountain 2 (4
Installation of PVC Conduit (Dia. 25mm) & Boxes for Power System (Disconnect Switch) at New Ticket
Inspection of Excavation for Heating and Chilled Water Line at Zone-G - As highlighted
Installed Aluminum Extrusion and Base Seal between Axis 02/P - 02/Q.
Installed Aluminum Extrusion and Base Seal between Axis 02/Q - 02/R.
Steel Reinforcements for Top Slab of Duct Tunnel for MCPE 1,at Zone 2M&2N , Axis 03S ( As Highlighted
shuttering for Top Slab of Duct Tunnel for MCPE 1,at Zone 2M&2N , Axis 03S ( As Highlighted )TOC 874.8
1st Layer of Block Work for Ground Floor at Large Mosque axis 5-6,C-D at Zone 1G (as highlighted)
Level and Location for Large Mosque for Upper First Floor for Columns & Walls (C5,C4,C3A,C2A,C2C,W5) ,
Inspection and compaction test 4th Layer backfilling for Zone 1G Between PC 44-46 Axis 01W - 01V (as
Inspection and Compaction for 5th & 6th Layer of 12th (continuation) backfilling at CRETACEOUS GARDE
Level and Location for Mass Concrete (1st layer) of Diaphragm wall Foundation at Zone 1E Axis 01M (As
Concreting for Mass Concrete (1st layer) of Diaphragm wall Foundation at Zone 1E Axis 01M (As highligh
Shuttering for Mass Concrete (1st layer) of Diaphragm wall Foundation at Zone 1E Axis 01M (As highligh
Antitermite under Mass Concrete of Diaphragm wall Foundation at Zone 1E Axis 01M (as highlighted)
1st Layer of Block Work for Ground Floor at Large Mosque axis 1-2,C-F at Zone 1G (as highlighted)
Protection Layer of 4mm thick Bituminous Protection Board for Foundation & wall of retaining Wall fr
1st & 2nd Layer of 4mm thick Modified Bituminous Water proofing Membrane for Foundation & wall of
Surface Preparation and Solvent base primer coating for Foundation & wall of retaining Wall from 01C
Inspection of Excavation for Tree Pit (15No's) as Details D-38-1- as highlighted
Installation of Rock and Boulder No. WRB-52 - 1st layer (1 of 6)
Installation of Rock and Boulder No. WRB-50 - 3rd layer (3 of 3)
Installation of Rock and Boulder No. WRB-50 - 2nd layer (2 of 3)
Installation of Rock and Boulder No. WRB-50 - 1st layer (1 of 3)
Inspection and Compaction Test for backfilling Sub-grade 1st layer (1 of 2) above Sand Covering for Pot
Inspection and Compaction Test for backfilling Sub-grade 1st layer (1 of 2) above Sand Covering for Fir
"Surface Preparation prior to start backfilling for Fire water line Pit B/F/04 at Zone-B - As Highlighted"
Inspection and Compaction Test for backfilling Sub-grade 3rd layer (3 of 4) above Sand for Non potable
Inspection and Compaction Test for backfilling Sub-grade 6th Layer (6 of 6) for Non potable water line
Inspection of Sand Covering Layer for Protection of MV Line from L/MV/17 to L/MV/16 at Zone-L - as hig
Inspection and Compaction Test for backfilling Sub-grade 2ndLayer (2 of 3) above Red Tiles for MV L
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 3) above Sand Covering for Fi
Inspection and Compaction Test for backfilling Subgrade 4th Layer (4 of 6) for MV Line Pit L/MV/02, L
Excavation for Fire Water Line Pit B/F/04 at Zone-B - as highlighted
Excavation for Potable Water Line Pit B/PW/10 at Zone-B - as highlighted
Inspection of Excavation for LV Line at Zone-G including Pit - G/LV/18, G/LV/22, G/LV/58, G/LV/13, G/LV/
Inspection for Installation of MV Line Junction Pit - B/MV/14 - as highlighted
Inspection and Compaction Test for backfilling Sub-grade 5th Layer (5 of 5) for Car Park Tree Pit as Deta
Inspection of Sand bedding under pipe Fire Water Line at Zone-F - as Highlighted (Stock Pile# 147)
Inspection and Compaction Test for backfilling Sub-grade 4th Layer (4 of 7) above Sand Covering to pro
'Bedding of Gravel 3/8" and Geotextile Surrounding Sub-Surface Drainage (Main Line & Branches)
Sand Cover & Protection for Low Current Lines of Telecom (from MH/ZG/TC/11 to 12 ), at Maze Garden
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 3 layers) for Fountain 2 (4
Stack Boulders Installed Layer 2 at Planting Bed Boulder 6, along Boundary Wall Inside Discovery Gar
Stack Boulders Installed Layer 1 at Planting Bed Boulder 6, along Boundary Wall Inside Discovery Gar
Stack Boulders Installed Layer 2 at Planting Bed Boulder 5, along Boundary Wall Inside Discovery Gar
Stack Boulders Installed Layer 1 at Planting Bed Boulder 5, along Boundary Wall Inside Discovery Gar
Inspection of Spatter Dash (Rough Coat) Prior to Plastering for Concrete Walls (All Sides), Inside Publ
Notification to Start Penetrate Cracks Injection at Ceiling Cracks (85 no's) for repair Inside Secu
Notification to Start Penetrate Cracks Injection at Ceiling Cracks (65 no's) for repair Inside Mana
Steel Reinforcement for Slab of New Ticketing Booth # 6A, As per Attached Highlighted Drawing's.
Installation of PVC Conduit (Dia. 25mm) and boxes for Lighting System (LED EXIT, C/CE, C, C7, IT/CE,
Installation of Straight PVC Conduit (Dia. 25mm) and Box for Voice Data (WIFI) in the Promenade & Ca
Installation of Straight PVC Conduit (Dia. 25mm) and Boxes for Fire Alarm (Speaker) in the Promenad
Installed ETFE Cushions (without aluminum caps) between axis 02-AG/02-AH.
Installed ETFE Cushions (without aluminum caps) between axis 02-AH/02-AI.
Installed ETFE Cushions (without aluminum caps) between axis 02-AI/02-AJ.
Installed ETFE Cushions (without aluminum caps) between axis 02-AJ/02-AK.
Installed ETFE Cushions (without aluminum caps) between axis 02-AK/02-AL.
Installed ETFE Cushions (without aluminum caps) between axis 02-AF/02-AG.
Installed ETFE Cushions (without aluminum caps) between axis 01-K/01-L.
Installed ETFE Cushions (without aluminum caps) between axis 01-N/01-O.
Surface Preparation Prior to start Backfilling for Jurassic Garden (as highlighted) Zone 2G 2H
Inspection for Installation of Stone Cladding without Copping for Seating Area 1- 11 at Zone-G (As Highli
Surface Preparation prior to start Waterproofing for Wing Wall of SBC-03 (Left Side) - Footing and wall -
Inspection and Compaction Test for backfilling Sub-grade 2nd layer (2 of 4) above Sand for Non potable
Inspection and Compaction Test for backfilling Sub-grade 5th Layer (5 of 6) for Non potable water line
Inspection of Sand bedding under pipe for Heating and Chilled Water Line at Zone-C&H including Pit C
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 10) around SBC-02 - Wing Wall
"Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 5) for MV Line Pit E/MV/01,
"Inspection for Installation of Heating and Chilled water Line Pit C/DC/02, H/DH/21, H/DH/22, H/DC/0
Inspection for Installation of MV Line Interface Pit - K/MV/04 - as highlighted
Inspection for Installation of Non-Potable Water Line Pit - POC-009 at Zone B - as highlighted
Inspection of Excavation for MV Line Pit - G/MV/23 & G/MV/04 at Zone-G - as highlighted
"Inspection for Installation of Heating and Chilled water Line Pit G-DH-19, G-DC-18, G-DH-12 at Zone-G -
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 5) for Storm line Gully G-O-10
Installation of Potable Water Line Pit G/PW/03 at Zone-G - as highlighted
Inspection and Compaction Test for backfilling Sub-grade 4th Layer (4 of 5) for Car Park Tree Pit as Deta
' Pipe Installation underground Drainge pipes From (FW-A-9) to (FW-A-11) ;(110mmØ-UPVC-Class-4)
'Bedding of Gravel 3/8" and Geotextile Surrounding underground Drainge pipes From (FW-A-9) to (
"Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 5) for Storm line branch and
Inspection and Compaction test for backfilling sub-grade 1st Layer (1 of 6) above Gravel around Manho
Mechanical Pipe sleeve Installation ,under craft floor At Crescent 2 zone 2A; ( dia 160&100 mm) ;As
Inspection of Blinding Concrete under MV Line Pit - B/MV/14 at Zone-B - as highlighted
Inspection of Excavation for MV Line Pit - B/MV/14 at Zone-B - as highlighted
Pipe Sleeve Installation of infill Wall inner Mechanical From Axis 02/AE to 02/AF At Crescent 2 zon
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 10) around SBC-02 - Wing Wall
Inspection of Excavation for RO Water Line Pit ROW-ISC-17 & POC-24 at Zone-B - As highlighted
Surface Preparation prior to start backfilling for MV Line Pit E/MV/01, E/MV/03, E/MV/02, E/MV/05 at Z
Inspection of Water Proofing for MV Line Pit E/MV/01, E/MV/03, E/MV/02, E/MV/05 at Zone- E (As High
Inspection and Compaction Test for backfilling Sub-grade 7th Layer (7 of 8) around SBC-09 - Wing Wall (R
Inspection for Installation of Precast Slab for MV Line Pit - C/MV/03 at Zone-C - As Highlighted (SCR:
Inspection of Excavation for Heating and Chilled Water Line at Zone-C&H including Pit C/DC/02, H/DC/0
Installed ETFE Cushions (without aluminum caps) between axis 01-M/01-N.
Installed ETFE Cushions (without aluminum caps) between axis 01-L/01-M.
Excavation and Bed Preparation for soak away drainage pipes at Jurassic Gardens Zone 2G as per atta
Inspection and Compaction Test for 3rd layer Backfilling to create slope Formation for EDPM Bedding
Steel Reinforcements for Columns neck for Energy Centers at Grid 4-13/K ,4-5/C-I 5/D-H (as highlighted
Shuttering & Concreting for Columns neck (INT) for Energy Center 2,Grid 13-14,D-H (as highlighted)
Level and Location for Columns neck (INT) for Energy Center,Grid 13-14,D-H (as highlighted)
Steel Reinforcements for MCPE 1 Suspended Slab of Duct Tunnel,at Zone 2M&2N , Axis 03T ( As Highli
Shuttering for MCPE 1 Suspended Slab of Duct Tunnel,at Zone 2M&2N , Axis 03T ( As Highlighted )TOC 8
Concreting for MCPE 1 Suspended Slab of Duct Tunnel,at Zone 2M&2N , Axis 03T ( As Highlighted )TOC
Level and Location for MCPE 1 Suspended Slab of Duct Tunnel,at Zone 2M&2N , Axis 03T ( As Highlighte
Steel reinforcements for Cafeteria undercroft Slab on Grade , Axis 02A to 02C zone 2A (As highlighted)
Shuttering for Cafeteria undercroft Slab on Grade, Axis 02A to 02C zone 2A (As highlighted)
Concreting for Cafeteria undercroft Slab on Grade, Axis 02A to 02C zone 2A (As highlighted)
Level and Location for Cafeteria undercroft Slab on Grade, Axis 02A to 02C zone 2A (As highlighted)
Shuttering for Front Canopy Foundation at Zone 1 Axis 01AD, 01AE, 01AF, 01AG, 01AH, 01AI (as highlig
Concreting for Front Canopy Foundation at Zone 1 Axis 01AD, 01AE, 01AF, 01AG, 01AH, 01AI (as highli
Level and Location for Front Canopy Foundation at Zone 1 Axis 01AD, 01AE, 01AF, 01AG, 01AH, 01AI (as
Stack Boulders Installed Layer at level +879.900, at Separate Boulder Line (Aviary garden Side), at W
Installation and Survey Report for Location and Levels of Anchor bolts for Front Canopy foundation at
Surface Preparation and Solvent base primer coating Under Strip Footing (RC) PC 65-67-69-71 at Zone 1L
Single Layer of 4mm Thick Modified Bituminous WaterProofing Membrane Under Strip Footing (RC) PC 65
Stack Boulders Installed Layer at level +879.500, at Separate Boulder Line (Aviary garden Side), at W
Geotextile & 50mm Screed Under Strip Footing (RC) PC 65-67-69-71 at Zone 1L (s highlighted)
Excavation and Bed preparation for Sub Surface Drainage Pipes (dia 110 mm PP) (for Trees) At 3 place
Antitermite Under Mass Concrete of strip Footing ( Inner ) Between (PC 66-68-70-72) (As highlighted) Z
Shuttering for Mass Concrete of strip Footing ( Inner ) Between (PC 66-68-70-72) (As highlighted) Zone1
Excavation & Bed Preparation for Electrical Line of Low Voltage, Crossing Near the Entrance of Mist G
Installed ETFE Cushions (without aluminum caps) between axis 01-O/01-P.
Inspection & Compaction tests of 11th Layer Backfilling (Sub-Grade) (Out of 13 layers) Between Bound
Plaster Guide Points & Accessories Prior to Plastering for Concrete Walls (All Sides), Inside Public Toi
Steel reinforcement for Wall of Fountain of Geyser Garden, inside water Garden, as highlighted area
Concrete Pouring & Shuttering for Slab of New Ticketing Booth # 5A As per Attached Highlighted Draw
Installed ETFE Cushions (without aluminum caps) between axis 01-H/01-I.
1st Layer of Block Work laying for ETFE Pump Room # 6113 at Zone 2G axis 02W (as highlighted)
Check Top Levels of Slab (+2950) for New Ticketing Booth # 5A As per Attached Highlighted Drawing's
Level and Location for Mass Concrete of strip Footing ( Inner ) Between (PC 66-68-70-72) (As highlighte
Level and Location for Strip footing (RC) at Zone 1D Between PC 19-21(as highlighted)
Concreting for Strip footing (RC) at Zone 1D Between PC 19-21 Axis 01J-01K (As highlighted)
Steel reinforcements for Front Canopy Foundation at Zone 1 Axis 01AD, 01AE, 01AF, 01AG, 01AH, 01AI
Installed ETFE Cushions (without aluminum caps) between axis 01-I/01-J.
Installed ETFE Cushions (without aluminum caps) between axis 01-G/01-H.
Installed ETFE Cushions (without aluminum caps) between axis 01-F/01-G.
Installed ETFE Cushions (without aluminum caps) between axis 01-J/01-K.
Installed ETFE Cushions (without aluminum caps) between axis 02-k/02-L.
Installed ETFE Cushions (without aluminum caps) between axis 02-L/02-M.
Installed ETFE Cushions (without aluminum caps) between axis 02-M/02-N.
Installed ETFE Cushions (without aluminum caps) between axis 01-E/01-F.
Installed Aluminum Caps between Axis 02/I - 02/J.
Installed Aluminum Caps between Axis 02/H - 02/I.
Installed Aluminum Caps between Axis 02/G - 02/H.
Installed Aluminum Caps between Axis 02/F - 02/G.
Installed Aluminum Caps between Axis 02/E - 02/F.
Installed Aluminum Caps between Axis 02/D - 02/E.
Installed Base Extrusion and Base Seal between Axis 02/O - 02/P.
Installed Base Extrusion and Base Seal between Axis 02/N - 02/O.
Installed Base Extrusion and Base Seal between Axis 02/AB - 02/AC.
Inspection and Compaction Test for backfilling Sub-grade 1st layer (1 of 4) above Sand for Non potable
"Mock up inspection of Copping for Seating Area (1) at Zone-G (SA-11) - As Highlighted"
Installation of Rock and Boulder No. WRB-51 - 2nd layer (2 of 2)
Installation of Rock and Boulder No. WRB-51 - 1st layer (1 of 2)
Pre insulated Chiled Water Pipes (S&R) 200mmØ( laying ,Aligment ,Leveling and fit up) From point (
Pre insulated Heat Water Pipes (S&R) 150mmØ( laying ,Aligment ,Leveling and fit up) From point (E
Pre insulated chilled Water Pipes (S&R) 65mmØ( laying ,Aligment ,Leveling and fit up) From point
Shuttering of Blinding under S.O.G of Devonion Garden in Zone 2M Axis 02AM-AP (as highlighted)
Inspection Of Pipe Installation For Irrigation ROW Mainline (200mmØ- UPVC-Claas-5 ); As per High
'Warning Tape For Inspection Of Pipe Installation For Irrigation ROW mainline ; (200mmØ- UPVC-Claa
'Warning Tape For Inspection Of Pipe Installation For Irrigation ROW mainline ; (200mmØ- UPVC-Claa
Steel Reinforcements for Energy Center (7nos) columns (ext) at Grid 2-4, A upto 875.35 (as highlighted)
Level and location for Excavation of Diaphragm wall foundation at zone 1E Axis 01M (as highlighted)
Shuttering for Mass Concrete (2nd layer) of Diaphragm wall Foundation at Zone 1E Axis 01M (as highlight
Concreting for Mass Concrete (2nd layer) of Diaphragm wall Foundation at Zone 1E Axis 01M (as highligh
Level and Location for Mass Concrete (2nd layer) of Diaphragm wall Foundation at Zone 1E Axis 01M (as h
Shuttering for MCPE 2 inner wall with Counterfort at Zone 2H, axis 02Z to 03I (as highlighted) from 871
Concreting for MCPE 2 inner wall with Counterfort at Zone 2H, axis 02Z to 03I (as highlighted) from 871
Level and Location for MCPE 2 inner wall with Counterfort at Zone 2H, axis 02Z to 03I (as highlighted)
Double Layer of Block Work of 20cm outer wall and 10cm around columns for Energy Center axis 17-2
Surface Preparation prior to start Backfilling from bottom of Blinding for Energy Center 2 (as highlighte
Shuttering for Strip footing (RC) at Zone 1D Between PC 19-21(as highlighted)
Inspection and compaction test 10th layer continuation backfilling for Internal Building for Zone 1N A
Inspection and compaction test 3rd Layer continuation backfilling for Zone 1G Between PC 44-46 Axis 0
Surface Preparation Prior Back filling for Retaining Wall for Zone 1A , Axis 01C - 02N (as highlighted) SP
Shuttering and Concreting for beam (ext.) of Energy Center 2, Axis 28-30, M-R (as highlighted) Level 875
Steel Reinforcements for Infill wall (inner) at Zone 2K between Axis 02AE-02AF (as highlighted)
Concreting for Mass Concrete (3rd layer) of Diaphragm wall Foundation at Zone 1E Axis 01M (as highlight
Shuttering for Mass Concrete (3rd layer) of Diaphragm wall Foundation at Zone 1E Axis 01M (as highlight
Inspection and Compaction Test for 1st layer Backfilling to create slope Formation for EDPM Bedding
Inspection and Compaction Test for 2nd layer Backfilling to create slope Formation for EDPM Bedding
Inspection and Compaction Test for 3rd layer Backfilling for Energy Center 2 (as highlighted) Zone 5A A
Level and Location for beam (ext.) of Energy Center 2, Axis 28-30, M-R (as highlighted) Level 875.50
Level and Location for Energy Center 2, Wall (W4) at Axis 0-1, I-C (as highlighted) level 877.00
Steel reinforcements for Cafeteria (undercroft) Wall (W18 & 19) as highlighted, upto 869.100 zone 2A
Steel Reinforcements for Child Care Grade Beam at Zone 2N (as highlighted)
Shuttering for Child Care Grade Beam at Zone 2N (as highlighted)
Concreting for Child Care Grade Beam at Zone 2N (as highlighted)
Installation of PVC conduit (dia. 25mm) and Box for Fire Alarm (Speaker & Flashing Beacon) at the Cre
Level and Location for Child Care Grade Beam at Zone 2N (as highlighted)
Installation of PVC conduit (dia. 25mm) and Box for Voice and Data (Telephone & WIFI) at the Crescent
Shuttering and Concreting for Energy Center 2, Wall (W4) at Axis 0-1, I-C (as highlighted) level 877.00
Shuttering for TIP WALL upto 872.70 Axis 01A (as highlighted) Zone 1A
Level and Location for TIP WALL upto 872.70 Axis 01A (as highlighted) Zone 1A
Excavation for Devonian Garden Foundation in Zone 2M Axis 02AL-AM ,02AO-AP (as highlighted)
Antitermite under Plain concrete for Devonian Garden Foundation in Zone 2M Axis 02AL-AM ,02AO-AP (
Shuttering for Plain concrete of Devonian Garden Foundation in Zone 2M Axis 02AL-AM ,02AO-AP (as hi
Concreting of Plain concrete under Devonian Garden Foundation in Zone 2M Axis 02AL-AM ,02AO-AP (a
Excavation for Devonian Garden under S.O.G in Zone 2M Axis 02AM-AP (as highlighted)
Steel Reinforcements for South Small Mosque Second Floor Suspended slab (as highlighted)
Inspection and Compaction for 3rd & 4th Layer of 12th (continuation) backfilling at CRETACEOUS GARD
Inspection and Compaction test for 7th layer Subgrade Backfilling for infill wall around stripfooting and
Steel Reinforcements,Shear Connector and Starter Bars for Ring Beam (Inner) at Zone 1A, Axis B-D (as
Shuttering for Ground Bearing Slab for Cafeteria Undercroft level at Zone 2A Axis 02A-02B (as highligh
Concreting for Ground Bearing Slab for Cafeteria Undercroft level at Zone 2A Axis 02A-02B (as highligh
Level and Location for Ground Bearing Slab for Cafeteria Undercroft level at Zone 2A Axis 02A-02B (as
Surface Preparation and Solvent base primer coating for BII-52 & BIV-52,Axis 01AN , 01-1 at Zone 1N (as
Single Layer of 4mm thick Modified Bituminous WaterProofing Membrane for BII-52 & BIV-52,Axis 01AN
Protection Layer of 4mm thick Bituminous Protection Board for BII-52 & BIV-52,Axis 01AN , 01-1 at Zone
Stiffener ST-2 (rebars) for ETFE pump room 6113 at zone 2G axis 02W (as highlighted) TOC 872.00
Stiffener ST-2 (shuttering) for ETFE pump room 6113 at zone 2G axis 02W (as highlighted) TOC 872.00
Installation of UPVC conduit (dia. 50mm &75mm) passing through the Wall for Low Voltage Ductbank (Po
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 7) above Sand Covering to pro
Surface Preparation and Repair (with "LA extra") for Internal surface of Concrete Walls (All Sides), In
Pipe Installation of Sub-Surface Drainage (Main Line & Branches) Pipes; (250&110 mmØ, UPVC-CLASS
Pipe Installation of Sub-Surface Drainage (Main Line & Branches) Perforated Pipes; (110 mmØ, UPVC
'Bedding of Gravel 3/8" and Geotextile Surrounding Sub-Surface Drainage (Main Line & Branches) P
Installation of Puddle Flange Pipes; (315mmØ UPVC CLASS 5) ; (Fauntain Wall) at Water Gardens (Gy
Pre insulated chilled Water Pipes (S&R) 100mmØ( laying ,Aligment ,Leveling and fit up) From point
Pre insulated chilled Water Pipes (S&R) 200mmØ( laying ,Aligment ,Leveling and fit up) From point
Mechanical Pipe Sleeves Installation for roof floor At South Small Mosque (Second floor) (Crescent
Pre insulated Chiled Water Pipes (S&R) 150mmØ & 100mmØ( laying ,Aligment ,Leveling and fit up) F
Completion of Stacked Boulders Wall with Grouting for Planting Beds All Layers, Near Plant Room ins
Completion of Stacked Boulders Wall with Grouting for Planting Beds All Layers at Discovery Garden
Inspection of Concrete Pouring for Slab of MV Line Pulling Pit - D/MV/04, E/MV/01, E/MV/03, E/MV/02
Inspection of Formwork for Slab of MV Line Pulling Pit - D/MV/04, E/MV/01, E/MV/03, E/MV/02, E/MV/
Inspection of Waterproofing for the Duct Bank of MV Line from G/MV/37 to G/MV/21 at Zone- G (As Hig
Inspection of Sand Covering to protect the pipe for Potable Water Line at Zone-B -as highlighted (Stock
Inspection of Sand Covering to protect the pipe for Fire Water Line at Zone-B -as highlighted (Stock Pile
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 3) above Red Tiles for MV
Inspection of Steel Reinforcement for Slab of MV Line Pulling Pit - D/MV/04, D/MV/32, D/MV/08,
Inspection and Compaction Test for backfilling Sub-grade 1st Laye (1 of 3) above Sand Covering for Fire
Inspection and Compaction Test for backfilling Sub-grade 1st Laye (1 of 3) above Sand Covering for Fire
Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 5) for Car Park Tree Pit as Deta
Inspection and Compaction Test for backfilling Sub-base 1st Layer (1 of 1) under Boulder No. WRB-50 -
Inspection and Compaction Test for backfilling Sub-grade 1st Laye (1 of 3) above Sand Covering for Pot
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 1) under Boulder No. WRB-50 -
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 5) for Car Park Tree Pit as Deta
Inspection of Concrete Pouring for Footing of MV Line Pulling Pit - C/MV/17 & C/MV/44 at Zone-H (As H
"Soil Preparation under Boulder No. WRB- 050 (Excluded in previous RFI# KAIG3-RFI-SW-C-7581-00)"
Inspection of Installation and Alignment for the Management Building from Grid Line E-F-G/03 to 06,
Preliminary Inspection of Erected Steel in Management Building from Grid Line E-F-G/03 to 06, P-Q-R/
Excavation and Soil preparation Prior to Backfilling for Fountain 2 (4 nos) Inside Physic Garden as hig
Concrete Pouring for Blinding Under Low Current Handholes and Pits, Low current (MH/WG/LC/14 & 5
Concrete Pouring for Blinding Under Electrical Handholes of Emergency (MH/WG/EM/20 & 21) & Low
Inspection & Compaction tests of Single Layer (Sub-Base) Backfilling above Sand Cover of Irrigation L
Coordinates & Levels of Blinding Under Low Current Handholes and Pits, Low current (MH/WG/LC/14
Coordinates & Levels of Blinding Under Electrical Handholes of Emergency (MH/WG/EM/20 & 21) & Lo
Coordinates & Levels for Wall of Fountain 1 (2 no's) Between Outer Canopy 1 and 2, Inside Physic Gar
Coordinates & Levels of Blinding under Decant Sump-D4 Inside Water Play garden, at Water Garden as
Inspection and Compaction Test for 2nd layer Backfilling for Energy Center 2 (as highlighted) Zone 5A A
Surface Preparation and Solvent base primer coating under foundation of diaphragm wall at zone 1E axis
Single Layer of 4mm Thick Modified Bituminous WaterProofing Membrane under foundation of diaphragm
Protection Layer of 4mm Thick Bituminous Protection Board under foundation of diaphragm wall at zone
Geotextile and 50mm Screed under foundation of diaphragm wall at zone 1E axis 01P (as highlighted) (2
Concrete Pouring & Shuttering for Wall of Fountain 1 (2 no's) Between Outer Canopy 1 and 2, Inside P
Installation of Protection Layer of 4mm Thick Protection Board for Footings & Grade Beams @ Grid (8-1
Steel Reinforcements for Wall 20 & 21 at Zone 1N & 1P internal buildings axis 01AR (as highlighted) TO
Shuttering & Concreting for Columns (12 nos.) at Energy Center Axis 24-28, R (as highlighted)
Level and Location for Columns (12 nos.) at Energy Center Axis 24-28, R (as highlighted) 875.00
Concrete Pouring for Blinding under Decant Sump-D4 Inside Water Play garden, at Water Garden as hi
Shuttering and Concreting for Columns neck (int.) of Energy Center 2, Axis 3, C-I & 4-5, C-H (as highlighte
Concrete Pouring & Shuttering for Beams (04 no's) of Abutement Walls of Internal Foundations inside
Level and Location for Columns neck (int.) of Energy Center 2, Axis 3, C-I & 4-5, C-H (as highlighted).
Steel Reinforcement for Wall of Fountain 1 (1 no's) at Left side of Outer Canopy 1, Inside Physic Gard
Inspection and Compaction test for 5th & 6th layer Subgrade Backfilling for infill wall around stripfooti
Surface Preparation and Solvent base primer coating for side foundation of diaphragm wall at zone 2N
Inspection of Spatter Dash (Rough Coat) Prior to Plastering for all walls (All sides) Inside Site Tower
Single layer of 4mm thick modified bituminous waterproofing membrane for side foundation of diaphra
Plaster Guide Points & Accessories Prior to Plastering for all walls (All sides) Inside Site Tower 2, as
Surface Preparation (With Sand Blasting) for Walls (all sides) Inside Plant Rooms of Physic garden, as
Protection layer of 4mm thick bituminous protection board for side foundation of diaphragm wall at zo
Inspection and Compaction for 1st & 2nd Layer of 12th (continuation) backfilling at CRETACEOUS GARD
Surface Preparation (With Sand Blasting) for Walls (all sides) Inside Plant Rooms of Maze Garden, at h
Inspection and compaction test for 5th layer subgrade backfilling above underground drainage pipe
Surface Preparation (With Sand Blasting) for Walls (all sides) Inside Plant Room of Discovery Garden,
Inspection and compaction for 11th & 12th Layer backfilling of Strip Footing Between Pile Cap ( PC-97-
Inspection and compaction test 9th layer continuation backfilling for Internal Building for Zone 1N Axi
Inspection and compaction test 1st & 2nd Layer continuation backfilling for Zone 1G Between PC 44-46
Shuttering for Devonian Garden Wall (1st) at zone 2M axis 02M (as highlighted) TOC 874.80
Concreting for Devonian Garden Wall (1st) at zone 2M axis 02M (as highlighted) TOC 874.80
Concreting for Infill wall (outer) axis 02F to 02E (as highlighted) Zone 2B (1st Stage)
Concreting for Mass Concrete (1st) under strip footing between PC 69-71 at Zone 1L TOC 865.93
Antitermite under Mass Concrete of Foundation at Axis (PC 65-67-69) (As highlighted) Zone1L
Concreting for Mass Concrete (1st) under strip footing between PC 65-67-69 at Zone 1L (as highlighted)
Shuttering for Mass Concrete (1st) under strip footing between PC 65-67-69 at Zone 1L (as highlighted)
Level and Location for Mass Concrete (1st) under strip footing between PC 65-67-69 at Zone 1L (as high
Surface preparation and Solvent base primer for Infill wall (inner side) at BOI 121-122, BOV 121-122,
Single layer of 4mm thick modified bituminous waterproofing membrane for (inner) Side of Infill wall
Protection layer of 4mm bituminous protection board for (inner) Side of Infill wall at Zone 2B between
Inspection of Spatter Dash (Rush Coat ) for Pump Room 6084 at Zone 2J axis 02AD (as highlighted)
Inspection of Plaster Guide Point and Plaster Accessories for Pump Room 6084 at Zone 2J axis 02AD (as
Antitermite under Mass Concrete of Foundation at Axis (PC 69-71) (As highlighted) T.O.C.865.930 Zone1
Concreting of Devonian Garden AHU Foundation at zone 2M (as highlighted) (3rd)
Gravel (Drainage) & Geo Textile (Filter membrane Terrain 1000) for Tree Pits (05 no's) at Centre Near
Gravel (Drainage) & Geo Textile (Filter membrane Terrain 1000) for Tree Pits (06 no's) at Centre of Sea
Excavation and Surface preparation for Decant Sump-D4 Inside Water Play garden, at Water Garden as
Sand Cover & Protection for Non-Potable Water (Irrigation Line ) Inside Sound & Light Garden, as high
Excavation for Low Current Handholes and Pits, Low current (MH/WG/LC/14 & 51), Fire Alarm & Secu
Excavation for Electrical Handholes of Emergency (MH/WG/EM/20 & 21) & Low Voltage (MH/WG/LV/38,
Inspection & Compaction tests of 3rd (Final) Layer (Sub-Grade) Backfilling (Out of 3 layers) along the
Surface preparation prior to Stone Cladding for Wall & Column of Boundary wall (Inner Side) @ span
Surface Preparation prior to start Water Proofing for MV Line Pit E/MV/01, E/MV/03, E/MV/02, E/MV/05
Inspection for Installation of Non-Potable Water Line Pit -POC-04 at Zone-B - as highlighted
Inspection for Installation of Non-Potable Water Line Pit -POC-33, POC-34 & POC-45 at Zone H&K - as hi
Inspection for Installation of Non-Potable Water Line Pit -NPW-ISC-14 at Zone B - as highlighted
Surface Preparation prior to start backfilling for SBC-02 - Footing and wall of Wing Wall - as highlighted
Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 7) above Sand Covering to pro
Inspection of Excavation for Non-Potable Water Line Isolation Pit - NPW-ISC-29, POC-25, POC-24, POC-
Inspection and Compaction Test for backfilling Sub-grade 4th Layer (4 of 6) for Non potable water line
Inspection and Compaction Test for backfilling Subgrade 3rd Layer (3 of 6) for MV Line Pit L/MV/02, L
Inspection of Excavation for MV Line from C/MV/43 to D/MV/27 at Zone-C&D including Pit C/MV/43,
Solvent Base Primer Coating prior to Membrane waterproofing for foundation & Kickers of Boundary w
Inspection for application of 1Coat Primer, Damp Proof (1st Coat & 2nd Coat) and Protection Board for
Surface Preparation prior to start Waterproofing for SBC-07 - Footing, wall, Slab and Upstand - as highli
Inspection for Blinding Concrete under MV Line Pulling Pit K/MV/04 at Zone-K - as highlighted
Inspection of Concrete Pouring for Footing of MV Line Pulling Pit - D/MV/05 & D/MV/20 at Zone-D (As H
Inspection of Formwork for Footing of MV Line Pulling Pit - D/MV/05 & D/MV/20 at Zone-D (As Highlight
Inspection of Steel Reinforcement for Footing and Wall of MV Line Pulling Pit - D/MV/05 & D/MV/20 at
"Inspection of Concrete Pouring for Wall of MV Line Pulling Pit - H/MV/30 at Zone-H (As Highlighted) "
Inspection of Formwork for Wall of MV Line Pulling Pit - H/MV/30 at Zone-H (As Highlighted)
Inspection for Installation of Non-Potable Water Line Pit - NPW-ISC-01, NPW-ISC-06, NPW-ISC-24, NPW-
"Inspection for Installation of Manhole Base and Upvc Pipe Connection for MH-G-12, MH-G-13, MH-G-14
"Inspection of Grouting (Horizontal & Vertical Joints) for Rock Boulder - RB-072 for All Layers"
Inspection of Formwork for Footing of MV Line Pulling Pit - C/MV/17 & C/MV/44 at Zone-H (As Highligh
Inspection of Steel Reinforcement for Footing and Wall of MV Line Pulling Pit - C/MV/17 & C/MV/44 at
Inspection of Excavation for LV Line at Zone-K including Pit - K/LV/05, K/LV/14, K/LV/42, K/LV/10, K/LV/0
Inspection and Compaction Test for backfilling Sub-grade 1st Layer ( 1 of 5) for Car Park Tree Pit as Deta
Inspection of Excavation for MV Line Pit - H/MV/30 at Zone-H - as highlighted
Inspection for Laying of Red Tiles and Warning Tape above the pipe for MV Line from D/MV/34 to E/MV
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 1) above Red Tiles for MV
Inspection of Sand bedding under pipe for Heating and Chilled Water Line at Zone-H&L - As highlighted
Inspection of backfilling Gravel 2nd Layer (2 of 2) around Manhole MH-O-11 - As Highlighted (Stock Pile
Surface Preparation prior to start backfilling for the Duct Bank of MV Line from G/MV/37 to G/MV/21 at
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 2) under Boulder No. WRB-26 -
Inspection of Blinding Concrete under Non-Potable Water Line Isolation Pit for POC-09 at Zone-B - as hi
Inspection and Compaction Test for backfilling Sub-grade 6th Layer (6 of 8) around SBC-09 - Wing Wall (R
"Inspection of backfilling Sand 2nd layer (2 of 6) for Non potable water line pit POC-03 at Zone-B - As Hi
Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 6) for Non potable water line
Inspection of Sand bedding under pipe for RO Water Line at Area-A & D - As highlighted (Stock Pile# 147
Inspection and Compaction Test for backfilling Subgrade 2nd Layer (2 of 6) for MV Line Pit L/MV/02,
Potable Water Pipes Sand Cover & Pipes Protection (30 cm above Pipes). As per highlighted Area in
'Fire Fighting Networks Sand Cover & Pipes Protection (30 cm above Pipes). As per highlighted Area
'Fire Fighting Networks Sand Cover & Pipes Protection (30 cm above Pipes). As per highlighted Area
'Pipe Installation of Strom Water pipe OUT FALL-G for (315mm Ø- UPVC Pipes-Class 4 ) for Storm Wat
'Bedding of Gravel 3/8" and Geotextile Surrounding Sub-Surface Drainage (Main Line & Branches) P
'Warning Tape For Inspection Of Pipe Installation For Irrigation ROW mainline Including Branches;
'Warning Tape For Inspection Of Pipe Installation For Irrigation ROW mainline Including Branches;
Inspection Of Pipe Installation For Irrigation ROW Sub-mainline Including Branches; (63&90mmØ- UP
Inspection Of Pipe Installation For Irrigation ROW mainline Including Branches; (200mmØ- UPVC-Claa
Inspection Of Pipe Installation For Non-Potable Water (Irrigation Main Line); (200&250 mmØ- UPVC-C
Concreting for ETFE Pump room # 6113 Slab on grade at Zone 2G Axis 02W (as highlighted) TOC 869.2
Level and Location for ETFE Pump room # 6113 Slab on grade at Zone 2G Axis 02W (as highlighted) TOC
Shuttering for MCPE 2 Bottom Slab of Duct Tunnel, axis 03G, 03H, 03E, 03F TOC 871.00 (as highlighted)
Concreting for MCPE 2 Bottom Slab of Duct Tunnel, axis 03G, 03H, 03E, 03F TOC 871.00 (as highlighted)
Excavation for Planter Box along the Boundary wall Span 38, inside Water Play Garden, at Water Gard
Level and Location for MCPE 2 Bottom Slab of Duct Tunnel, axis 03G, 03H, 03E, 03F TOC 871.00 (as high
Excavation for Planter Boxes Between Boulders near Boundary wall Span 37 & 38, inside Water Play G
Excavation and Bed preparation for Sub Surface Drainage Pipes (CP 160mm and branch 110 mm PP) (fo
Surface preparation prior continuation backfilling at CRETACEOUS GARDEN as zone 2D 2E (as Highlighte
Inspection & Compaction tests of 2nd Layer (Sub-Grade) Backfilling (Out of 3 layers) along the Bounda
excavation and surface preparation prior to filter bedding and pipe installation for under ground dr
Sand Cover & Protection for Irrigation Line (90 mm dia) from Plant room to exit way from Outer side,
Inspection and Compaction test 1st layer for Devonian garden (last 3 mtrs) from axis AQ Zone 2M (1st of
Installation of Single Layer of 4mm thick Modified Bituminous Waterproofing Membrane under foundatio
Installation of Protection Layer of 4mm thick Bituminous Protection Board under foundation of diaphrag
Inspection for Plastering of Internal Walls Inside Toilets (GF-5004 & 5006), at Grid (18-20/K-L) at M
Shuttering for ETFE Pump room # 6113 Slab on grade at Zone 2G Axis 02W (as highlighted) TOC 869.2
Geotextile and 50mm Screed under foundation of diaphragm wall (4 footing) at zone 1E axis 01P (as hig
Surface preparation prior to Stone Cladding for Wall & Column of Boundary wall (Outer Side) @ span
Shuttering and Concreting of blinding for (3) soak away for cretaceous garden zone 2D,2E (as highlighte
Level and Location under blinding of (3) soak away for cretaceous garden zone 2D,2E (as highlighted)
Coordinates & Levels for Wall of Fountain 1 (1 no's) at Left side of Entrance, Inside Physic Garden as
Block works for ETFE Pump Room # 6141 at Zone 2E axis 02Q above Lintel Beam upto bottom of Ring be
Block Work laying above Lintel Beam upto bottom of ring beam (876.00) for ETFE Pump Room # 6144 at
Concrete Pouring & Shuttering for Wall of Fountain 1 (1 no's) at Left side of Entrance, Inside Physic
Block Work laying for ETFE Pump Room # 6146 above Concrete Beam upto bottom of ring beam (876.00)
steel reinforcement, shutter and Concreting for Duct Bank under SOG undercroft at cafeteria,zone 2A
Steel Reinforcement for Fountain 1 (1 no's) at Right side of Outer Canopy 2, Inside Physic Garden as h
Shuttering and Concreting for Duct Bank Across Zone 2A (as Highlighted)
Steel Reinforcement for Slab of New Ticketing Booth # 5A, As per Attached Highlighted Drawing's.
Steel Reinforcements for ETFE Pump room # 6113 Slab on grade at Zone 2G Axis 02W (as highlighted) T
Inspection of Installation and Alignment for the Management Building from Grid Line E-F-G/03 to 06,
Preliminary Inspection of Erected Steel in Management Building from Grid Line E-F-G /03 to 06, P-Q-R/
Installation of PVC Conduit (Dia. 25mm) and Boxes for Fire Alarm (Smoke Detector & Voice Alarm) at
Installation of PVC Conduit (Dia. 25mm) & Boxes for Lighting System (Lighting Fixture) at New Ticket
Installation of AIR ROD (Length 3m) & ROD Bracket for Earthing & Lightning System (Air Terminal) bes
Existing level Prior to start Excavation for Energy Center (mechanical) (as highlighted) axis 15-30, M-R
Shuttering for Large Mosque for Upper First Floor for columns (C3A,C4,C5 ) Walls (W1), Axis C-F, 1-2 Zo
Concreting for Retaining wall (wall) at Axis 02K to 02I Zone 6 & 7 (as highlighted)
Level and Location for Retaining wall (wall) at Axis 02K to 02I Zone 6 & 7 (as highlighted)
Steel Reinforcements for Ground Bearing Slab for Cafeteria Undercroft level at Zone 2A Axis 02A-02B (
Inspection and compaction test for 3rd & 4th layer subgrade backfilling above underground drainage
Inspection and compaction for 9th & 10th Layer backfilling of Strip Footing Between Pile Cap ( PC-97-
Inspection and Compaction test for 4th & 5th layer subgrade Backfilling for Retaining Wall (above found
Inspection and Compaction test for 3rd & 4th layer Subgrade Backfilling for infill wall around stripfooti
Concreting for Large Mosque for Upper First Floor for columns (C3A,C4,C5 ) Walls (W1), Axis C-F, 1-2 Zo
1st Layer of Block Work layout for Energy Center outer Wall axis 17-29, R (as highlighted)
Surface Preparation Prior Back filling for Strip Footing Zone 1G between PC 44,46 Axis 1W-1V ( As Hig
Inspection and compaction test 8th layer continuation backfilling for Internal Building for Zone 1N Axi
Shuttering for Ground Bearing Slab for Cafeteria Undercroft level at Zone 2A Axis 02B-02C-02D (as high
Concreting for Ground Bearing Slab for Cafeteria Undercroft level at Zone 2A Axis 02B-02C-02D (as hig
Level and Location for Ground Bearing Slab for Cafeteria Undercroft level at Zone 2A Axis 02B-02C-02D
Steel Reinforcements of Devonian Garden AHU Foundation at zone 2M (as highlighted) (3rd)
Shuttering of Devonian Garden AHU Foundation at zone 2M (as highlighted) (3rd)
Level and Location of Devonian Garden AHU Foundation at zone 2M (as highlighted) (3rd)
Shuttering for Retaining wall (wall) at Axis 02K to 02I Zone 6 & 7 (as highlighted)
Antitermite under Mass Concrete of Diaphragm wall Foundation at Zone 1E Axis 01M (as highlighted) (3
Shuttering for Mass Concrete (1st layer) of Diaphragm wall Foundation at Zone 1E Axis 01M (as highlight
Concreting for Mass Concrete (1st layer) of Diaphragm wall Foundation at Zone 1E Axis 01M (as highlight
"Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 5) for Storm line branch and
Inspection of backfilling Gravel 1st Layer (1 of 2) around Manhole MH-O-11 - As Highlighted (Stock Pile
Inspection of Sand Covering Layer for Protection of MV Line from D/MV/35 to D/MV/09 & D/MV/34 to D
Inspection and Compaction Test for backfilling Sub-base 1st Layer (1 of 1) under Boulder No. WRB-26 -
Inspection and Compaction Test for backfilling Sub-grade 5h Layer (5 of 8) around SBC-09 - Wing Wall (Ri
Inspection for Blinding Concrete under MV Line Pulling Pit C/MV/03 at Zone C - as highlighted
"Surface Preparation prior to start backfilling for Car Park Tree Pit as Details D-38-1, as highlighted in
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 3) under Boulder No. WRB-26 -
"Inspection and Compaction Test for backfilling Sub-grade 7th Layer (7 of 7) for Storm Water Line from
Inspection of Excavation for Heating and Chilled Water Line at Zone-L - As highlighted
Inspection of Sand Covering Layer for Protection of MV Line from D/MV/35 to E/MV/05 & D/MV/34 to E
Inspection of Concrete Pouring for Wall of MV Line Pit - E/MV/02, E/MV/05, E/MV/01 and E/MV/03 at Zo
Inspection of Formwork for footing of MV Line Pit - E/MV/02, E/MV/05, D/MV/04, D/MV/32 and D/MV/0
Inspection for Laying of Red Tiles and Warning Tape above the pipe for MV Line from E/MV/02 to E/MV
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 1) beside MV Line from D/MV
Level and Location for Mass Concrete (1st layer) of Diaphragm wall Foundation at Zone 1E Axis 01M (as h
Steel Reinforcement for Infill wall (inner) at Zone 2H Axis 02AA-02AB TOC 876.00 (as highlighted)
Shuttering for Infill wall (inner) at Zone 2H Axis 02AA-02AB TOC 876.00 (as highlighted)
Concreting for Infill wall (inner) at Zone 2H Axis 02AA-02AB TOC 876.00 (as highlighted)
Level and Location for Infill wall (inner) at Zone 2H Axis 02AA-02AB TOC 876.00 (as highlighted)
Shuttering for Mass Concrete (2nd layer) of Diaphragm wall Foundation at Zone 1N Axis 01AM (as highli
Concreting for Mass Concrete (2nd layer) of Diaphragm wall Foundation at Zone 1N Axis 01AM (as highl
Pre insulated chilled Water Pipes (S&R) 400mmØ( laying ,Aligment ,Leveling and fit up) From point
Inspection of Sand Covering to protect the pipe for Potable Water Line at Zone-G - as highlighted (Stock
"Inspection of backfilling Sand 1st layer (1 of 6) for Non potable water line pit POC-03 at Zone-B - As Hi
Pre insulated chilled Water Pipes (S&R) 400mmØ( laying ,Aligment ,Leveling and fit up) From point
Inspection of Sand bedding under pipe for Heating and Chilled Water Line at Zone-F - As highlighted (St
Pre insulated chilled Water Pipes (S&R) 200mmØ( laying ,Aligment ,Leveling and fit up) From point
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 6) for Non potable water line
Level and Location for Mass Concrete (2nd layer) of Diaphragm wall Foundation at Zone 1N Axis 01AM (as hi
Inspection and Compaction Test for backfilling Subgrade 1st Layer (1 of 6) for MV Line Pit L/MV/02, L
Steel Reinforcements for Columns neck (int.) of Energy Center 2, Axis 3, C-I & 4-5, C-H (as highlighted).
Inspection of Concrete Pouring for Slab of MV Line Pulling Pit - B/MV/11 at Zone-B (As Highlighted)
Shuttering and Concreting for (9 nos.) Columns (ext.) of Energy Center 2, Axis 0-2, A-C (as highlighted).
"Inspection of Formwork for Slab of MV Line Pulling Pit - B/MV/11 at Zone-B (As Highlighted) "
Level and Location for (9 nos.) Columns (ext.) of Energy Center 2, Axis 0-2, A-C (as highlighted).
Inspection for Installation of Precast Slab for MV Line Pit - H/MV/09 at Zone-H - As Highlighted (SCR:
Level and Location for Large Mosque for Upper First Floor for Walls (W1), Axis E-F, 1-2 Zone 1G (as high
Steel Reinforcements for MCPE 1 Roof Slab of Duct Tunnel, axis 03U TOC 874.80 (as highlighted) Zone
Inspection of Surface Preperation prior to start backfilling for Manhole MH-O-11 and Gullies G-O-11, G-
Shuttering for MCPE 1 Roof Slab of Duct Tunnel, axis 03U TOC 874.80 (as highlighted) Zone 2M 2N
Concreting for MCPE 1 Roof Slab of Duct Tunnel, axis 03U TOC 874.80 (as highlighted) Zone 2M 2N
"Inspection of Casting Concrete for Short Piece and Surface Preperation prior to start waterproofing
Level and Location for MCPE 1 Roof Slab of Duct Tunnel, axis 03U TOC 874.80 (as highlighted) Zone 2M
Steel Reinforcements for MCPE 1 Bottom Slab of Duct Tunnel, axis 03U TOC 874.80 (as highlighted) Zon
Level and Location for Large Mosque for Upper First Floor for Columns & Walls (C5,C4,C3A,C2A,C2C,W5) ,
Concreting for Large Mosque for Upper First Floor for Columns & Walls (C5,C4,C3A,C2A,C2C,W5) , Axis C-
Shuttering for Large Mosque for Upper First Floor for Columns & Walls (C5,C4,C3A,C2A,C2C,W5) , Axis C-
Two coat of bituminous damp proofing coating for Foundation and walls and clomns ( C-10 ,C-11,C-
Excavation and Surface Preparation Prior to filter bedding and pipe installation for Soak Away of creat
Installation of UPVC conduit (4x110mm dia.) Low Current (TELECOM) Ductbank no.GG/D-TL/01 in betw
Level and Location for MCPE 3 Roof Slab, axis 02R - 02S TOC 875.974 & 875.850 (as highlighted) Zone 2E
Concreting for Front Canopy Foundation at Zone 1 Axis 01O, 01 AN, 01AM, 01AL, 01K, 01J (as highlight
Concreting for Infill wall between BII 125-126 Axis 02AZ-02BA (as highlighted) Zone 2R
Shuttering for 4th layer Mass Concrete under Central Bridge Abutment foundation zone 4 (as highlighte
Level and Location for 4th layer Mass Concrete under Central Bridge Abutment foundation zone 4 (as hi
Inspection for Installed Low Current Handholes (MH/WG/LC/05, 06, 07 & 09) and Fire Alarm & Security
Inspection of Thrust Block for UPVC Pipe (160 mm Dia) for Fire Water Line at Zone- B - As Highlighted
Inspection for Installed Electrical Handholes of Low Voltage (MH/WG/LV/22, 27 & 28) and Emergency
Inspection for Installed Low Current Handholes of Fire Alarm & Security (MH/WG/FA/01,02 & 03), Insi
Inspection for Installed Electrical Handholes of Low Voltage (MH/WG/LV/01, 02, 03, 04, 05, 06, 07, 08
Inspection for Installed Low Current Handholes (MH/WG/LC/02 & 03) and Fire Alarm & Security (MH/
Inspection for Installed Electrical Handhole of Emergency (MH/WG/EM/02), between Mist & Geyser Ga
Cooncrete Pouring & Shuttering for Foundation & Kicker (Starter) for Fountain (3), inside Physic Garde
Inspection for Plastering of Internal Walls Inside Toilets (GF-5034, 5035, 5036 & 5037) at Management
Single layer of 4mm thick modified bituminous waterproofing membrane for Devonian Garden Footing a
Inspection of Spatter Dash (Rough Coat) Prior to Plastering of Internal Walls Inside Toilets (GF-5034
Level and location for Excavation of Strip footing between PC 66-68-70-72 (as highlighted) Zone 1L
Shuttering for Infill wall between BII 125-126 Axis 02AZ-02BA (as highlighted) Zone 2R
Level and Location for Infill wall between BII 125-126 Axis 02AZ-02BA (as highlighted) Zone 2R
Excavation for Planter Boxes Between Boundary Wall and Boulders at Top Side of Water Play Garden,
Protection Layer of 4 mm thick bituminous Protection Board for promenade Bridge Abutment and retain
Surface preparation Prior to start cementitous Water proofing, & Stone Cladding for ZONE 2R Infill wal
Excavation for Planter Boxes Between boulders at Top Side of Water Play Garden, Inside Water Garden
Geotextile and 50mm Screed at top of the Foundation for Retaining wall for Zone 4 (as highlighted) Axi
Installation of EMT conduit and Box for Lighting ( E1, E1/CE, A, A/CE, Exit Light, Switch & Presen
Surface Preparation and Solvent base primer coating under foundation of diaphragm wall (4 footing) at
Inspection and compaction test for 2nd layer subgrade backfilling above underground drainage pipe
Inspection and compaction for 8th Layer backfilling of Strip Footing Between Pile Cap ( PC-97-PC-99 ),
Stack Boulders Installed Layer at level +879.500, along Open Channel (Aviary garden Side), at Wadi #
Inspection and Compaction test for 3rd layer subgrade Backfilling for Retaining Wall (above foundation)
Excavation for Pilocene Garden at Zone 1J & 1K (as highlighted)
Surface Preparation prior backfilling for Retaining wall Foundation and Abuttment at axis 01L-01M Zone
Inspection and Compaction test for 2nd layer Subgrade Backfilling for infill wall around stripfooting and
Two Layers of 4mm thick modified bituminous waterproofing membrane for retaining wall (2m) (863.65)
Steel Reinforcements for Ground Bearing Slab for Cafeteria Undercroft level at Zone 2A Axis 02B-02C-0
Level and Location for MCPE 2 wall & Counter fort at axis 03E-02Z (as highlighted) at Zone 2G, 2H, 2J, 2
Concreting for MCPE 2 wall & Counter fort at axis 02X--02Y (as highlighted) at Zone 2G, 2H, 2J, 2K , Leve
Concreting for Mass Concrete (1st layer) of Diaphragm wall Foundation at Zone 1N Axis 01AM (as highli
Stack Boulders Installed Layer at level +879.100, along Open Channel (Aviary garden Side), at Wadi #
Concreting for Blinding of Diaphragm wall Foundation at Zone 1E Axis 01P (as highlighted)
Shuttering for MCPE 2 wall & Counter fort at axis 02X--02Y (as highlighted) at Zone 2G, 2H, 2J, 2K , Leve
Coordinates & Levels for Beams (04 no's) of Abutement Walls of Internal Foundations inside Butterfly
Surface preparation Prior to start cementitous Water proofing, & Stone Cladding for ZONE 2Q Infill wal
Concreting for Retaining wall front Canopy Corbel (3 nos.) Between Axis 01AC-01AB-01AA-01Z (as highl
Concreting for Infill wall (outer) at Zone 1F Axis 01P-01Q TOC 876.00 (as highlighted)
Surface Preparation and Base Primer Coating for South watch tower (outer walls) (as highlighted) upto
Two coat Damp Proofing Coating for South watch tower (outer walls) (as highlighted) upto 860.70 Zone
Inspection for Installation of Heating and Chilled Water Line Pit for H/DC/09, H/DC/10, H/DH/11, H
Protection layer of 4mm thick bituminous protection board for South watch tower (outer walls) (as hig
Shuttering for TIP WALL from 873.725 upto 876.80 Axis 02BC (as highlighted) Zone 2R
Concreting for TIP WALL from 873.725 upto 876.80 Axis 02BC (as highlighted) Zone 2R
Level and Location for TIP WALL from 873.725 upto 876.80 Axis 02BC (as highlighted) Zone 2R
Steel Reinforcements for MCPE 2 Wall and Counter fort, axis 02AC, 03K TOC 875.55 (as highlighted) Zon
Level and Location for Blinding of Diaphragm wall Foundation at Zone 1E Axis 01P (as highlighted) (2nd
Weld Visual & NDT Inspection for the Washer plates Crescent 01, Zone 3 - 1E From Axis 01M to 01P (A
Shuttering for Mass Concrete (1st layer) of Diaphragm wall Foundation at Zone 1N Axis 01AM (as highli
Antitermite under Mass Concrete of Diaphragm wall Foundation at Zone 1N Axis 01AM (as highlighted)
Level and Location of Blinding for Under Croft Slab of Cafeteria in zone2A Axis 02B (as highlighted)
Concreting of Blinding for Under Croft Slab of Cafeteria in zone2A Axis 02B (as highlighted)
Shuttering of Blinding for Under Croft Slab of Cafeteria in zone2A Axis 02B (as highlighted)
Antitermite under Blinding for Under Croft Slab of Cafeteria in zone2A Axis 02B(as highlighted)
Excavation for Diaphragm wall Foundation in Zone 1E Axis 01M (as highlighted)
Steel Reinforcements for Columns (12 nos.) at Energy Center Axis 24-28, R (as highlighted)
Steel reinforcements for Retaining wall (wall) at Axis 02K to 02I Zone 6 & 7 (as highlighted)
1st Layer of Block Work layout for Energy Center outer Wall axis 17-29, M & 29-30, M-R (as highlighted)
Level and Location for Columns (ext.) for Energy Center 2, Axis 7-14, L & 7-11, A (as highlighted)Level 8
Shuttering and Concreting for Columns (ext.) for Energy Center 2, Axis 7-14, L & 7-11, A (as highlighted)
"Concreting for Infill wall for 2 infill walls Buttress 71 axis ( 02/J ) & Butterss 72 axis ( 02/K ) (as highlig
Inspection and Compaction test for 1st layer Subgrade Backfilling for infill wall around stripfooting and
Inspection and Compaction Test for 4th layer Backfilling of Isolated footing of Internal building at AXI
Inspection and compaction test for 1st layer subgrade backfilling above underground drainage pipe s
Two Coats of Bituminous Damp Proofing for RC Foundation for Walls (W3,W4,W5,W6,W7) of Zone 1A &
Excavation for Diaphragm wall Foundation in Zone 1E Axis 01P (as highlighted) (2nd part)
Surface Preparation and Base Primer Coating for RC Foundation for Walls (W3,W4,W5,W6,W7) of Zone
Surface preparation and Solvent Base Primer Coating RC Strip Footing foundation of Zone 1D PC 23-2
Concreting for MCPE 2 wall & Counter fort at axis 02Y-02Z (as highlighted) at Zone 2H from 871.00 upto
Concreting for Stairs at Large Mosque Zone 1G Axis 5.1-6, E-F from 871.10 to 874.60 (as highlihgted)
Shuttering for Mass Concrete (1st) under strip footing between PC 69-71 at Zone 1L TOC 865.93
Level and Location for MCPE 2 wall & Counter fort at axis 02Y-02Z (as highlighted) at Zone 2H from 871
Level and Location for Mass Concrete (1st) under strip footing between PC 69-71 at Zone 1L TOC 865.93
' 300 mm Gravel 3/8" Backfilling and Geotextileof Foul Water Line for (110mmØ - UPVC- Class 4) fr
Level and Location for Front Canopy Foundation at Zone 1 Axis 01O, 01 AN, 01AM, 01AL, 01K, 01J (as h
Shuttering for Front Canopy Foundation at Zone 1 Axis 01O, 01 AN, 01AM, 01AL, 01K, 01J (as highlight
' 300 mm Gravel 3/8" Backfilling and Geotextile of Foul Water Line for (160&110mmØ - UPVC- Class 4
Steel reinforcements for Front Canopy Foundation at Zone 1 Axis 01O, 01 AN, 01AM, 01AL, 01K, 01J (as
Inspection and compaction for 6th & 7th Layer backfilling of Strip Footing Between Pile Cap ( PC-97-P
Inspection and Compaction test for 1st & 2nd layer subgrade Backfilling for Retaining Wall (above found
Inspection and Compaction Test for 3rd layer Backfilling of Isolated footing of Internal building at AXI
Inspection for gravel above underground drainage pipe soak away at CRETACEOUS GARDEN ZONE 2E 2D (
Pipe Installation of Sub-Surface Drainage (Main Line & Branches) Perforated Pipes; (110 mmØ, UPVC
Pipe Installation of Water Features pipes; (160mm SDR11-PE100) at Water Garden (Boats Garden) (R
Pre insulated chilled Water Pipes (S&R) 200mmØ( laying ,Aligment ,Leveling and fit up) From point
'Bedding of Gravel 3/8" and Geotextile surrounding underground Drainge pipes (soak away);(160&1
"Inspection and compaction test 10th layer for Backfilling at Cretaceous Garden zone 2D,2E (as highligh
Inspection and compaction for 6th Layer backfilling Between BO (72-73-74-75-76-77) & infill wal Axis
Level and Location for Mass Concrete (1st layer) under Diving wall at Zone 1N Axis 01AM TOC 865.00
Level and Location for Infill wall (outer) at Zone 1F Axis 01P-01Q TOC 876.00 (as highlighted)
Shuttering for Infill wall (outer) at Zone 1F Axis 01P-01Q TOC 876.00 (as highlighted)
Inspection and Compaction Test for 1st layer Backfilling for Energy Center 2 (as highlighted) Zone 5A Axi
Concreting for blinding ETFE PUMP ROOM #6113 Axis 02-W, ZONE 2G (as highlighted) at CRESCENT ,K
Sand Bedding for Electrical Lines of Low Voltage (MH/PG/LV/06-12) and Emergency (MH/PG/EM/04-13),
Installation of straight PVC Conduit (Dia. 25mm) and boxes for Lighting System (LED 1M, CT, C, CD,
Installation of straight PVC Conduit (Dia. 25mm) & Boxes for Lighting System (LED W5, LED W5/E) at Fi
Coordinates & Levels of Blinding under Fountain 2 (4 nos) Inside Physic Garden as highlighted area in
Inspection of Plastering for Walls Inside Hand Wash (GF-5038) at Grid (10/N-Q), at Management Build
Inspection & Compaction tests of 10th Layer Backfilling (Sub-Grade) (Out of 13 layers) Between Bound
Inspection & Compaction tests of 1st Layer (Sub-Grade) Backfilling (Out of 3 layers) along the Bounda
Excavation and Bed preparation for Sub surface Pipes (250mm dia Main and 110 mm Sleeves) at entran
Excavation & Bed preparation for Sub Surface Lines (110mm dia. PP) Inside Outer Canopy 2, at Physic
Concrete Pouring & Shuttering for Blinding under Fountain 2 (4 nos) Inside Physic Garden as highlight
Steel Reinforcement for Beams (04 no's) of Abutement Walls of Internal Foundations inside Butterfly
Gravel (Drainage) & Geo Textile (Filter membrane Terrain 1000) for Tree Pits (45 no's), inside Butterf
Excavation for Tree Pit (01 no's) Along Boundary Wall (Inner side) near Plant room, at Discovery Gard
Marking & Check for coordinates of Tree Pit (01 no's) Along Boundary Wall (Inner side) near Plant ro
Gravel (Drainage) & Geo Textile (Filter membrane Terrain 1000) for Tree Pits (33 no's) Along Boundary
Surface Preparation prior to start backfilling for Duct Bank of Fire & Security line from B/FS/40 to C/FS
Surface Preparation prior to start backfilling for Duct Bank of Telecommunications line from B/TL/43 t
Inspection of Water Proofing for Duct Bank of Fire & Security line from B/FS/40 to C/FS/10 at Zone-B&C
Inspection of Water Proofing for Duct Bank of Telecommunications line from B/TL/43 to B/TL/11 at Zon
Surface Preparation prior to start Water Proofing for Duct Bank of Fire & Security line from B/FS/40 to
Surface Preparation prior to start Water Proofing for Duct Bank of Telecommunications line from B/TL/
"Inspection and Compaction Test for backfilling Sub-grade 6th Layer (6 of 6) for Storm Water Line from
Inspection and Compaction test for backfilling Sub-grade 5th Layer (5 of 6) for Non potable water line p
"Inspection and Compaction Test for backfilling Sub-grade 4th Layer (4 of 4) for Storm Water Line fro
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 6) for Non potable water line
Inspection of Concrete Pouring for Wall of MV Line Pulling Pit - G/MV/38 at Zone-G - As Highlighted.
Inspection of Excavation for Non-Potable Water Line Isolation Pit - POC- 03 at Zone-B - as highlighted
Inspection of Formwork for Wall of MV Line Pulling Pit - G/MV/38 at Zone-G - As Highlighted. ( SCR:
Inspection of Sand bedding under pipe for Heating and Chilled Water Line at Zone-H - As highlighted (St
Soil Preparation under Boulder No. WRB-26
Inspection of Sand Covering Layer for Protection of MV Line from D/MV/03 to D/MV/16 & D/MV/08 to D
Installation of straight PVC Conduit (Dia. 25mm) & Boxes for Power System (Socket Outlet) at First Fl
Installation of Straight PVC Conduit (Dia. 25mm) and Box for Voice Data (WIFI) in the Promenade & Ca
Installation of Straight PVC Conduit (Dia. 25mm) and Boxes for Fire Alarm (Speaker) in the Promenade
Installation of Main Potable Water Pipes (65 mmØ-UPVC-Class-5) at Zone H - PIT(H/PW/01) to Point
Installation of Main Fire Water Pipes (200mmØ-UPVC-Class-5) From PIT(H/F/02) to Point (647954.44
Pre insulated chilled Water Pipes (S&R) 65mmØ( laying ,Aligment ,Leveling and fit up) From point
Steel reinforcements for Infill wall between BII 125-126 Axis 02AZ-02BA (as highlighted) Zone 2R
Shuttering and Concreting for Beams for Energy Center 2, Axis17-28 /M (as highlighted)Level 875.50
Level and Location for Beams for Energy Center 2, Axis17-28 /M (as highlighted)Level 875.50
Surface Preparation prior to start Backfilling for Energy Center 2 (as highlighted) Zone 5A Axis 3-8, C-I,
Shuttering for Ground Bearing Slab for Cafeteria Undercroft level at Zone 2A Axis 02C-02D (as highligh
Concreting for Ground Bearing Slab for Cafeteria Undercroft level at Zone 2A Axis 02C-02D (as highligh
Level and Location for Ground Bearing Slab for Cafeteria Undercroft level at Zone 2A Axis 02C-02D (as
Steel reinforcements for TIP WALL upto 872.70 Axis 01A (as highlighted) Zone 1A
Shuttering for MCPE 2 wall & Counter fort at axis 02Y-02Z (as highlighted) at Zone 2H from 871.00 upto
Steel Reinforcements for MCPE 3 Roof Slab, axis 02R - 02S TOC 875.974 & 875.850 (as highlighted) Zone
Shuttering for MCPE 3 Roof Slab, axis 02R - 02S TOC 875.974 & 875.850 (as highlighted) Zone 2E 2F
Concreting for MCPE 3 Roof Slab, axis 02R - 02S TOC 875.974 & 875.850 (as highlighted) Zone 2E 2F
Inspection for Blinding Concrete under MV Line Pulling Pit C/MV/44, C/MV/17, D/MV/05, D/MV/20 at Zo
Inspection of Excavation for MV Line Pit C/MV44 at Zone-C - as highlighted
Inspection for Installation of Non-Potable Water Line Pit - POC-03, POC-06 and POC-32 at Zone B&G - as
Surface Preparation prior to start backfilling for Non potable water line Pit POC-03 & POC-32 at Zone-B
"Inspection and Compaction Test for backfilling Sub-grade 5th Layer (5 of 5) for Storm Water Line from
Inspection and Compaction test for backfilling Sub-grade 4th Layer (4 of 6) for Non potable water line p
Inspection and compaction for 5th Layer backfilling Between BO (72-73-74-75-76-77) & infill wal Axis
"Inspection and compaction test 9th layer for Backfilling at Cretaceous Garden zone 2D,2E (as highlight
Level and Location for Large Mosque for Upper First Floor for Wall 1& Parapet , Axis C-D, 1-2 Zone 1G (a
Steel Reinforcment for Large Mosque for Upper First Floor for Columns & Walls (C1B,C5,C4,C3A,C2A,C2C,
Steel Reinfocements for Retaining wall front Canopy Corbel Between Axis 01Z, 01AA, 01AB, 01AC (as hi
Shuttering for Retaining wall front Canopy Corbel Between Axis 01Z, 01AA, 01AB, 01AC (as highlighted)
Pipe Sleeve Installation (Drianage pipe) Mechanical At Crescent 2 (DEVONIAN GARDEN) zone 2M; (UP
Protection layer of 4mm thick bituminous protection board for C* & W2 at Internal building At Zone 1N
Shuttering for Devonian Garden Wall (1st) at zone 2M axis 02M (as highlighted) TOC 874.80
Level and Location for Devonian Garden Wall (1st) at zone 2M axis 02M (as highlighted) TOC 874.80
Surface Preparation and Solvent Base Primer Coating under Strip footing Foundation of Zone 1D Betwee
Single layer of 4mm thick modified bituminous waterproofing membrane under Strip footing Foundatio
Geotextile protection and Screed under Strip footing Foundation of Zone 1D Between PC 19-21 Axis 01K-
Shuttering for Large Mosque for Upper First Floor for Wall 1 & Parapet , Axis C-D, 1-2 Zone 1G (as highli
Concreting for Large Mosque for Upper First Floor for Wall 1& Parapet , Axis C-D, 1-2 Zone 1G (as highli
Level and location for Excavation of Strip footing between PC 65-67-69-71 (as highlighted) Zone 1L
Installation of PVC conduit (dia. 32mm) and Box for Lighting (Exit Light) at the Crescent -2 Infill Wall
Installation of PVC conduit (dia. 75mm) sleeve for Lighting at the Physic Garden (Foutain) as per attach
Installation of PVC conduit (dia. 25mm) and Box for Voice and Data (WIFI) at the Crescent -2 Infill Wall
Installation of PVC conduit (dia. 25mm) and Box for Fire Alarm (Speaker) at the Crescent -2 Infill Wall
Installation of stub-up PVC conduit (dia. 25mm) for Security (BUTT/CAM & VISD) at the Butterfly Garden
Installation of stub-up PVC conduit (dia. 25mm) for Fire Alarm (Smoke Detector,Monitoring Module & C
Installation of stub-up PVC conduit (dia. 25mm) for Voice and Data (BUTT/CAM & VISD) at the Butterfly
Excavation for Tree Pits (05 no's) at Centre Near Seat walls, inside Butterfly Garden, as highlighted ar
Marking & Check for coordinates of Tree Pits (05 no's) at Centre Near Seat walls, inside Butterfly Gar
Stack Boulders Installed Layers at levels +879.550 , along Open Channel (Boundary wall Side), at Wad
Stack Boulders Installed Layers at levels +879.100 , along Open Channel (Boundary wall Side), at Wad
Inspection & Compaction tests of 3rd (Final) Layer Backfilling (Sub-Grade) (Out of 3 layers) under Fou
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 3 layers) under Fountain 2
Surface preparation prior to waterproofing for foundation & Kickers of Boundary wall (Inner & Outer
Block work from Lintel upto final Height for all walls, Inside Site Tower 2, as per the highlighted atta
Stack Boulders Installed Layer at level +878.700, along Open Channel (Aviary garden Side), at Wadi #
Steel Reinforcement for Fountain 1 (1 no's) at Left side of Entrance, Inside Physic Garden as highlight
Concrete Pouring & Shuttering for Bottom Slab and Starter (Kicker) for Water Fountain of Geyser Gard
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 3 layers) under Fountain 2
Surface preparation prior to Backfilling along the Boundary Wall (Outer side) of Span 12, (At B.O.B L
Concrete Pouring for Blinding Under Gabions at Butterfly Garden , as Highlighted area in attached Dr
Excavation & Bed preparation for Sub Surface Lines (110mm dia. PP) at Planting Beds, Inside Outer Ca
Surface Preparation Prior to Backfilling under Fountain 2 (4 nos) Inside Physic Garden as highlighted
Coordinates & Levels for Bottom Slab and Starter (Kicker) for Water Fountain of Geyser Garden, insid
Installation of Earthing Clamp with 95mm² Earthing Cable for reinforcement Steel Structure at the Wa
Installation of EMT conduit and Box for Lighting (CD, CD/CE, E1, E1/CE, A, A/CE, CS & Presence
Concrete Pouring for Blinding for Stone Edger inside Water Play Garden as highlighted in attached dr
Coordinates & Levels for Foundation & Kicker (Starter) for Fountain (3), inside Physic Garden as highl
Inspection for Repair by Nitomortar TC2000 Epoxy, for Inner Surfaces of tank of Wet Well F, Inside W
Excavation for Tree Pits (06 no's) at Centre of Seat walls, inside Butterfly Garden, as highlighted area
Marking & Check for coordinates of Tree Pits (06 no's) at Centre of Seat walls, inside Butterfly Garden
Stone Cladding for Wall & Column of Boundary wall (Outer Sides) @ span 12 at Water Garden, as high
Stack Boulders Installed Layers at levels +878.700 , along Open Channel (Boundary wall Side), at Wad
Stack Boulders Installed Layers at levels +878.300 , along Open Channel (Boundary wall Side), at Wad
Excavation & Bed preparation for Sub Surface Lines (110mm dia. PP) Inside Outer Canopy 3, at Physic
Sand Bedding for Water Feature Line of Drain Pipe (150 mm dia) From Inside to Outside of Boat garden
Inspection & Compaction tests of 9th Layer Backfilling (Sub-Grade) (Out of 13 layers) Between Bounda
Inspection for Installed Low Current Handholes (MH/PG/LC/12) and Fire Alarm & Security (MH/PG/FA/0
Surface Preparation prior to start backfilling for MV Line Pit L/MV/02, L/MV/03, L/MV/16, L/MV/17 at Zo
Surface Preparation prior to start Waterproofing for Wing Wall of SBC-07 (Left Side) - Footing and wall -
Inspection of Concrete Pouring for Footing of MV Line Pulling Pit - H/MV/30 at Zone-H (As Highlighted)
Excavation and Bed preparation for Sub Surface Pipe Lines (2 no's dia 110 mm PP) (Part 1) inside Tunne
Inspection of Formwork for Footing of MV Line Pulling Pit - H/MV/30 at Zone-H (As Highlighted)
Inspection of Steel Reinforcement for Footing and Wall of MV Line Pulling Pit - H/MV/30 at Zone-H (As H
Inspection of Excavation for Heating and Chilled Water Line at Zone-L - As highlighted
Inspection of Excavation for MV Line Pit C/MV/17, D/MV/05, D/MV/20 at Zone-H - as highlighted
Inspection of Excavation for Non-Potable Water Line at Zone-L - as highlighted
Concreting for MCPE 2 wall & Counter fort at axis 03E-02Z (as highlighted) at Zone 2G from 871.00 upt
Inspection of Blinding Concrete under Heating and Chilled Water Line Pit G/DH/12 at Zone-G As highligh
Inspection of Excavation for Heating and Chilled Water Line Pit G/DH/12 at Zone-G As highlighted
Inspection of Blinding Concrete under Non-Potable Water Line Isolation Pit for POC-46 at Zone-G - as hi
Excavation for Fire Water Line at Zone-L - as highlighted
"Inspection for Installation of Heating and Chilled wahter Line Pit G-DH-21, G-DC-20, G-DC-22, G-DC-
"Inspection for Installation of Heating and Chilled wahter Line Pit G-DH-04, G-DC-06, F-DH-04, F-DC-05
Concreting for ETFE PUMP ROOM Slab on Grade at axis 02-AN zone 2M (as highlighted) at CRESCENT
Inspection of Excavation for RO Water Line at Area-H Zone-L - As highlighted
Inspection for Installation of Precast Slab for MV Line Pit - G/MV/37 at Zone-G - As Highlighted (SCR:
Inspection of Excavation for Non-Potable Water Line at Zone-L - as highlighted
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 1) beside MV Line from D/M
"Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 3) for Storm Water Line fro
"Inspection and Compaction Test for backfilling Sub-grade 4th Layer (4 of 5) for Storm Water Line from
Inspection and Compaction test for backfilling Sub-grade 3rd Layer (3 of 6) for Non potable water line p
Surface Preparation prior to start Water Proofing and WaterProofing for MV Line Pit L/MV/02, L/MV/03
Excavation for Potable Water Line at Zone-L - as highlighted
Inspection of Blinding Concrete under Potable Water Line Pit L/PW/05 at Zone-L - as highlighted
Excavation for Potable Water Line Pit L/PW/05 at Zone-L - as highlighted
Inspection of Blinding Concrete under Heating and Chilled Water Line Pit G/DH/19, G/DC/18 at Zone-G -
Inspection of Blinding Concrete under Heating and Chilled Water Line Pit H/DH/21, H/DH/22 at Zone-H -
Inspection of Excavation for Heating and Chilled Water Line Pit H/DH/21, H/DH/22 at Zone-H - As highli
Inspection and Compaction Test for backfilling Sub-base 1st Layer (1 of 1) under Boulder No. WRB-51 -
Inspection and Compaction Test for backfilling Sub-base 1st Layer (1 of 1) under Boulder No. WRB-50 -
Inspection of Excavation for Heating and Chilled Water Line at Zone-B including Pit G/DC/20, G/DH/21,
Inspection of Excavation for Heating and Chilled Water Line at Zone-G including Pit F/DH/04, F/DC/05,
Coordinates & Levels of Blinding under Seat walls (3 no's) Inside Outer canopy 2, at Physic Garden, as
Inspection & Compaction tests of 6th (Final) Layer (Sub-Grade) Backfilling (Out of 6 layers) along the
Excavation and Bed preparation for Water Feature Line of Drain Pipe (150 mm dia) From Inside to Outs
Inspection & Compaction tests and Surface Preparation Prior to Blinding under Seat walls (3 no's) Ins
Steel Reinforcement for Foundation & Kicker (Starter) for Fountain (3), inside Physic Garden as highli
Stack Boulders Installed Layers at levels +877.900 , along Open Channel (Boundary wall Side), at Wad
Stack Boulders Installed Layers at levels +877.500 , along Open Channel (Boundary wall Side), at Wad
Excavation for Tree Pits (06 no's) At Left side of Entrance, along Boundary wall Inside Maze Garden,
Marking & Check for coordinates of Tree Pits (06 no's) At Left side of Entrance, along Boundary wall
Excavation for Tree Pits (09 no's) At Right side of Plant room, along Boundary wall Inside Maze Garde
Marking & Check for coordinates of Tree Pits (09 no's) At Right side of Plant room, along Boundary w
Installed Base Extrusion and Base Seal between Axis 02/AB - 02/AC.
Installed Base Extrusion and Base Seal between Axis 02/AC - 02/AD.
Installed Base Extrusion and Base Seal between Axis 02/AE - 02/AD.
Surface preparation and Solvent base primer under AHU Foundation for Devonian Garden (3rd part) Zo
Single layer of 4mm thick modified bituminous waterproofing membrane under AHU Foundation for De
Geotextile Protection and Screed under AHU Foundation for Devonian Garden (3rd part) Zone 2M Axis
Steel Reinforcements for Ground Bearing Slab for Cafeteria Undercroft level at Zone 2A Axis 02C-02D (
Concreting for Infill wall (inner) at Zone 1A Axis 01A to 01B Upto 869.90 (as highlighted)
Inspection and compaction for 4th Layer backfilling Between BO (72-73-74-75-76-77) & infill wal Axis
"Inspection and compaction test 8th layer for Backfilling at Cretaceous Garden zone 2D,2E (as highlight
Inspection and Compaction Test for 1st and 2nd layer Backfilling of Isolated footing of Internal building
Inspection and compaction for 4th & 5th Layer backfilling of Strip Footing Between Pile Cap ( PC-97-P
1st Layer of Block Work layout for Energy Center outer Wall axis 17-29, R (as highlighted)
Steel Reinforcements for beam (ext.) of Energy Center 2, Axis 28-30, M-R (as highlighted) Level 875.50
Steel Reinforcements for Columns (ext.) of Energy Center 2, Axis 0-4, A-C (as highlighted).
Steel Reinforcements for Columns neck (int.) of Energy Center 2, Axis 9-10, D-H (as highlighted).
Protection layer of 4mm thick bituminous protection board for Energy Center Side of Footing (inner foun
Concreting for MCPE 3 Suspended Slab at duct tunnel, axis 03C, 03D TOC 874.80 (as highlighted) Zone 2
Antitermite for blinding under Slab of Cafeteria under croft Axis 02A - 02C Zone2A (as highlighted)
Shuttering for blinding under Slab of Cafeteria under croft Axis 02A - 02C Zone2A (as highlighted)
Concreting for blinding under Slab of Cafeteria under croft Axis 02A - 02C Zone2A (as highlighted)
Level and Location for blinding under Slab of Cafeteria under croft Axis 02A - 02C Zone2A (as highlighted
Level and Location for Infill wall (inner) at Zone 1A Axis 01A to 01B Upto 869.90 (as highlighted)
Concreting for Large Mosque for Upper First Floor for columns (C3A,C4,C5 ) Walls (W1), Axis C-F, 1-2 Zo
Concreting for Infill wall KICKER (INNER) axis 02/AB to 02/AA (as highlighted) Zone 2H
Steel reinforcements for TIP WALL from 873.725 upto 876.80 Axis 02BC (as highlighted) Zone 2R
Concreting for outer infill wall with counter fort at Axis 02S-02T (as highlighted) Zone 2F (KAIG3-SCR-
Shuttering for MCPE 2 wall & Counter fort at axis 03E-02Z (as highlighted) at Zone 2G from 871.00 upto
Level and Location for MCPE 2 wall & Counter fort at axis 03E-02Z (as highlighted) at Zone 2G from 871
1st Layer of Block Work for Ground Floor Wall at South small mosque axis 7, D-E at Zone 2B (as highligh
Steel Reinforcements for Diaphragm Wall Beam axis 02AQ from 877.00 to 877.50 (as highlighted) Zone
Shuttering for Diaphragm Wall Beam axis 02AQ from 877.00 to 877.50 (as highlighted) Zone 2N
Concreting for Diaphragm Wall Beam axis 02AQ from 877.00 to 877.50 (as highlighted) Zone 2N
Level and Location for Diaphragm Wall Beam axis 02AQ from 877.00 to 877.50 (as highlighted) Zone 2N
Shuttering and Concrete Encasement for mechanical pipes of cafeteria building zone 2A
Steel Reinforcements for Columns (Ext) for Energy Center 2,Grid 7-11, A (as highlighted)
Steel Reinforcements for Columns neck (INT) for Energy Center 2,Grid 13-14, D-H (as highlighted)
Shuttering and Concreting for Columns (neck) for Energy Center-2, Grid 1-2, C-I (as highlighted)
Inspection and compaction test for sand cover above MEP pipes inside undercroft area of cafeteria bui
Level and Location for Columns (neck) for Energy Center-2, Grid 1-2, C-I (as highlighted)
Excavation for Dividing wall Foundation in Zone 1N Axis 01AM (as highlighted)
Excavation for Diaphragm wall Foundation in Zone 1E Axis 01P (as highlighted)
Antitermite under Blinding of Diaphragm wall Foundation at Zone 1E Axis 01P (as highlighted)
Shuttering for Blinding of Diaphragm wall Foundation at Zone 1E Axis 01P (as highlighted)
Level and Location for Blinding of Diaphragm wall Foundation at Zone 1E Axis 01P (as highlighted)
Level and Location for blinding at ETFE PUMP ROOM #6113 Axis 02-W, ZONE 2G (as highlighted) at C
Inspection and Compaction test for 2nd Layer backfilling Between BO ( 72-73-74-75-76-77)+Infill wall
Inspection and Compaction test for 1st Layer backfilling of Pile cap Between ( PC-111,PC-113,PC-115,
Surface Preparation Prior Backfilling Between BO (72-73-74-75-76-77) +Infill wall Axis 02/O-02/K ZON
Shuttering and Concreting for Energy Center Internal Column (neck) at Axis 11-12, D-H (as highlighted)
Concreting for Infill wall at zone 2R axis 02BB to 02BC (BOI 127-128) (AS HIGHLIGHTED)
Concreting for Grund Beams (inner) between axis 01/W to 01/V zone 1G (as highlighted) at CRESCENT
Inspection of Sand Covering Layer for Protection of MV Line from D/MV/35 to E/MV/05 & D/MV/34 to E
"Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 3) for Storm Water Line fro
Inspection for Blinding Concrete under MV Line Pulling Pit H/MV/30 - as highlighted
"Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 5) for Storm Water Line from
"Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 3) for Storm Water Line from
Inspection of Excavation for Heating and Chilled Water Line at Zone-F including Pit F/DC/01 - As highlig
Pipe Installation underground Drainge pipes (soak away);(160&110mmØ-UPVC-Class-4) at crescent2
Installation of Main Fire Water Pipes (160mmØ-UPVC-Class-5) From PIT(B/F/13) to Point (647701.21
Inspection & Compaction tests of 8th Layer Backfilling (Sub-Grade) (Out of 13 layers) Between Bounda
Inspection & Compaction tests of Single Layer (Sub-Base) Backfilling, Between Geyser Garden & Aviar
Plastering for Internal walls (All Sides) of Ladies Toilet, Inside Public Toilet # 3, At highlighted area i
Stack Boulders Installed Layer at level +878.300, along Open Channel (Aviary garden Side), at Wadi #
Stack Boulders Installed Layer at level +877.900, along Open Channel (Aviary garden Side), at Wadi #
Stack Boulders Installed Layer at level +877.500, along Open Channel (Aviary garden Side), at Wadi #
Stack Boulders Installed Layer at level +877.100, along Open Channel (Aviary garden Side), at Wadi #
Stack Boulders Installed Layer at level +876.700, along Open Channel (Aviary garden Side), at Wadi #
Aluminum Cap Installation between Axis 02/AL - 02/AN.
Aluminum Cap Installation between Axis 02/AM - 02/AN.
Aluminum Cap Installation between Axis 02/AN - 02/AO.
Aluminum Cap Installation between Axis 02/AO - 02/AP.
Mockup for Stone Cladding for Crescent between Axis 02AY-02AZ & 02AW-02AX as highligted (Zone
Base Seal and Extrusion Aluminum Installation between Axis 01I - 01J.
Steel Reinforcements for 1st floor columns at SOUTH SMALL MOSQUE (as highlighted).
Inspection and Compaction test for backfilling Subb-grade 1st Layer (1 of 3) above Sand Covering for R
"Inspection and Compaction Test for backfilling sub-grade 1st Layer (1 of 3) above Sand Covering for N
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 2) above Sand Covering for RO
Inspection and Compaction test for backfilling Sub-grade 4th Layer (4 of 4) for Non potable water line P
"Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 5) for Storm Water Line fro
Inspection and Compaction test for backfilling Sub-grade 2nd Layer (2 of 6) for Non potable water line p
Inspection of Sand bedding under pipe for RO Water Line at Zone-G,K&L - As highlighted (Stock Pile#132
Surface Preparation prior to start Waterproofing for Wing Wall of SBC-07 (Right Side) - Footing and wall
Inspection of Concrete Pouring for the Upstand of SBC-07 - As Highlighted
Inspection of Excavation for Heating and Chilled Water Line at Zone-G - As highlighted
Excavation and Soil Preparation prior to start backfilling Layers for Roads, Starting from ST.0+000 to 0+
'Warning Tape For Inspection Of Pipe Installation For Irrigation ROW mainline Including Branches;
'Warning Tape For Inspection Of Pipe Installation For Irrigation ROW mainline Including Branches;
'Warning Tape For Non-Potable Water (Irrigation Main Line); (200 mmØ- UPVC-Claas-5 ) ; As per Hig
Shuttering for STAIR at Large Mosque, Axis E-F, 5-6 zone 1G (as highlighted)
Concreting for STAIR at Large Mosque, Axis E-F, 5-6 zone 1G (as highlighted)
' Soak Way Pipe Installation of Foul Water Line for (110mmØ - UPVC- Class 4) from (FW-A-13-6). At
Level and Location for STAIR at Large Mosque, Axis E-F, 5-6 zone 1G (as highlighted)
Shuttering for Rc Foundations Retaining wall Between Axis 02G-02E (as highlighted) Zone 6&7
'Bedding of Gravel 3/8" and Geotextile Surrounding Foul Water Line for (110mmØ - UPVC- Class 4) f
Steel Reinfocement for Rc Foundations Retaining wall Between Axis 02G-02E (as highlighted) Zone 6&7
Pre insulated Chiled Water Pipes (S&R) 200mmØ( laying ,Aligment ,Leveling and fit up) From point (
Pre insulated Heat Water Pipes (S&R) 150mmØ( laying ,Aligment ,Leveling and fit up) From point (E
Concreting for Rc Foundations Retaining wall Between Axis 02G-02E (as highlighted) Zone 6&7
Level and Location for Rc Foundations Retaining wall Between Axis 02G-02E (as highlighted) Zone 6&7
1st Layer of Block Work laying above Beam for ETFE Pump Room # 6144 at Zone 2D axis 02L (as highligh
"Inspection and compaction test 7th layer for Backfilling at Cretaceous Garden zone 2D,2E (as highlight
Inspection and Compaction test for 4th Layer for subgrade Backfilling for Internal building at AXIS 02 B
Inspection and compaction for 2nd & 3rd Layer backfilling of Strip Footing Between Pile Cap ( PC-97-
Inspection and compaction for 1st Layer backfilling of Internal Foundation of Energy Center axis C-J, 0-
Level and Location for Energy Center Internal Column (neck) at Axis 11-12, D-H (as highlighted)
Steel Reinforcements for 24 nos. Columns (ext.) for Energy Center 2, Axis 7-14, L (as highlighted)Level 8
Installation of Soak Away Base (SA-03) at north administration building Zone 2R
Surface Preparation and Base Primer Coating for C* & W2 at Internal building At Zone 1N & 1P (as highl
Two coat of bituminous Damp proofing for C* & W2 at Internal building At Zone 1N & 1P (as highlighte
Aluminum flashing and sealant for MCPE 3 wall at axis 02R-02S (as highlighted) at 871.00 Zone 2E 2F
Shuttering for Large Mosque for Upper First Floor for columns (C3A,C4,C5 ) Walls (W1), Axis C-F, 1-2 Zo
Level and Location for Large Mosque for Upper First Floor for columns (C3A,C4,C5 ) Walls (W1), Axis C-F,
Steel Reiforcements for STAIR at Large Mosque, Axis E-F, 5-6 zone 1G (as highlighted)
1st layer of Block layout for ETFE Pump Room # 6141 at Zone 2E axis 02Q above Lintel Beam (as highli
Level and Location for retaining wall (wall) At zone 6&7 at Axis 02M-02K (as highlighted) TOW 868.90
Installed Base Extrusion and Base Seal between Axis 02/AI - 02/AH.
Level and Location for Tunnel 1 wall part-C (as Highlighted) Zone 2H from 869.35 upto 875.00
Concreting for Tunnel 1 wall part-C (as Highlighted) Zone 2H from 869.35 upto 875.00
Shuttering for Tunnel 1 wall part-C (as Highlighted) Zone 2H from 869.35 upto 875.00
Aluminum flashing and sealant for MCPE 3 wall at axis 02P-02R (as highlighted) at 871.00 Zone 2E 2F
Installatin of single Layer of 4mm thick Modified Bituminous Water Proofing Membrane Under Strip fo
Block works for ETFE Pump Room # 6141 at Zone 2E axis 02Q Upto 872.00 (as highlighted)
Surface Preparation and Solvent Base Primer Coating Under Strip footing Foundation Between PC (5-7)
Geotextile and 50mm Screed Under Strip footing Foundation Between PC (5-7) for Zone 1A (as highligh
Concreting for outer Infill wall at zone 2C axis 02H to 02I (AS HIGHLIGHTED) Attachment With KAIG3-S
Concreting for Infill inner wall at Crescent between (02-AY & 02-AX) (As highlighted) ZONE 2Q
Concreting Infill wall on BOI 122 Axis 02AX (as highlighted) Zone 2Q
Sand Bedding for Low Current Lines (MH/PG/LC/06-08 and 11-13) and Fire Alarm & Security lines (MH
Sand Bedding for Electrical Lines of Emergency (MH/PG/EM/07-08), Inside Physic Garden as highlight
3rd Coat Cementitious Water proofing for Wing Walls (Inner Side) (Upto 15cm above FGL) of SBC-06, a
3rd Coat Cementitious Water proofing for Wing Walls (Inner Side) (Upto 15cm above FGL) of SBC-08, a
Installation of Steel Structures of All Canopy for Ticket Booths - QTY = 16 no's, at Zone 3B
Excavation for Tree Pits (09 no's) Inside Maze Garden, as Highlighted area in Attached Drawings.
Marking & Check for coordinates of Tree Pits (09 no's) Inside Maze Garden, as Highlighted area in At
Excavation for Tree Pits (09 no's) Inside Aviary Garden, as Highlighted area in Attached Drawings.
Marking & Check for coordinates of Tree Pits (09 no's) Inside Aviary Garden, as Highlighted area in A
Concrete Pouring & Shuttering for Wall & Column of Boundary Wall at Span 47 of Water Garden as hig
Inspection and compaction for 1st Layer prior backfilling of Strip Footing Between Pile Cap ( PC-97-PC
Bolt Tightening Inspection For Attached Steel in Anchor Bolt Deviation in Crescent 01 , Zone 3-1E from
Concreting for MCPE 2 Suspended Slab (as highlighted) Axis 031-I, TOC varies as attached in the plan, Z
Level and Location for Infill Wall Stage 1(outer)Between Axis 02E-02F( (as highlighted) at Zone 2B
Level and Location for Infill wall (inner) at Zone 1A Axis 01B to 01C to 01D Upto 869.90 (as highlighted)
Protection Layer of 4mm thick Bituminous Protection Board for strip footing Between Axis 02K-02L upto
Steel Reinforcement for Infill wall (inner) at Zone 1A Axis 01A to 01B to 01C to 01D Upto 869.90 (as high
Inspection and compaction test 5th layer for Backfilling at MCPE2 inner axis 02AD-02AH (as highlighted
Inspection and Compaction test for 3rd Layer for subgrade Backfilling for Internal building at AXIS 02 B
"Inspection and compaction test 6th layer for Backfilling at Cretaceous Garden zone 2D,2E (as highlight
Level and Location for MCPE 3 Suspended Slab at duct tunnel, axis 03C, 03D TOC 874.80 (as highlighted)
Shuttering for MCPE 3 Suspended Slab at duct tunnel, axis 03C, 03D TOC 874.80 (as highlighted) Zone 2E
Steel Reinforcements for MCPE 3 Suspended Slab at duct tunnel, axis 03C, 03D TOC 874.80 (as highlight
Concreting for Infill wall (inner) at Zone 1A Axis 01B to 01C to 01D Upto 869.90 (as highlighted)
Shuttering for Infill wall (inner) at Zone 1A Axis 01A to 01B to 01C to 01D Upto 869.90 (as highlighted)
Steel Reinforcement for Infill wall (inner) at Zone 2H Axis 02AA-02AB TOC 876.00 (as highlighted)
Steel Reinforcement for Infill wall (outer) at Zone 1F Axis 01P-01Q TOC 876.00 (as highlighted)
Concreting for Retaining wall front Canopy Corbel Between Axis 01AD, 01AE, 01AF, 01AG (as highlighted
Steel reiforcements for Devonian Garden Wall (1st) at zone 2M axis 02M (as highlighted) TOC 874.80
Steel reinforcements for outer Infill wall Beam at axis 02E - 02F Zone 2B (as highlighted) (1st)
"Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 5) for Storm Water Line from
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 2) above Sand Covering for RO
Inspection and Compaction Test for backfilling Sub-grade 4th Layer (4 of 5) around MV Line Pit C/MV/1
Inspection and Compaction Test for backfilling Sub-grade 5th Layer (5 of 5) under Boulder No. WRB-51 -
Inspection and Compaction Test for backfilling Sub-grade 5th Layer (5 of 5) under Boulder No. WRB-50 -
Surface Preparation prior to start backfilling for the Duct Bank of MV Line from C/MV/12 to C/MV/20 at
Inspection and Compaction test for backfilling Sub-grade 6th layer (6 of 7) around MV Line Pit G/MV19
Inspection of Concrete Pouring for Wall of MV Line Pulling Pit - L/MV/11 and L/MV/14 at Zone-L (As Hig
Inspection of Formwork for Wall of MV Line Pulling Pit - L/MV/11 and L/MV/14 at Zone-H&L (As Highlig
Inspection for Installation of Heating and Chilled Water Line Pit for H/DH/26, H/DH/25, H/DH/29, H
Inspection of Sand Covering to protect pipe for RO Water Line at Zone-C - As highlighted (Stock Pile#132
Inspection of Blinding Concrete under Heating and Chilled Water Line Pit for H/DH/29, H/DH/30, H/DC/2
Steel reinforcements for Internal Bulding (2 nos.) Foundation RF3 & RF2 at Zone 1A (as highlighted) A
Shuttering for Internal Bulding (2 nos.) Foundation RF3 & RF2 at Zone 1A (as highlighted) Axis 01C-01
Concreting for Internal Bulding (2 nos.) Foundation RF3 & RF2 at Zone 1A (as highlighted) Axis 01C-01
Level and Location for Internal Bulding (2 nos.) Foundation RF3 & RF2 at Zone 1A (as highlighted) Axi
Surface Preparation and Solvent Base Primer for promenade Bridge Abutment and retaining wall in Zon
Two layer of 4mm thick modified bituminous waterproofing membrane for promenade Bridge Abutment a
Surface Preparation prior backfilling for Foundation at Zone 2R Axis BA-AZ (as highlighted)and Survey
Surface Preparation and Base Primer Coating for Foundation and Beam for Energy Center 2 (as highlight
Steel Reinforcements for Neck columns for Energy Center 2,Grid C-I/1,C-I/2 (as highlighted)
Steel Reinforcements for Beams for Energy Center 2, Axis17-28 /M (as highlighted)Level 875.50
Shuttering for outer Infill wall at zone 2C axis 02H to 02I (AS HIGHLIGHTED) Attachment With KAIG3-S
Level and Location for outer Infill wall at zone 2C axis 02H to 02I (AS HIGHLIGHTED) Attachment With
Steel reinforcement for Large Mosque Lower 1st floor suspended slab and Beams at Axis 5-6, C-F (as hi
Concreting for Buttress Head at BOI, BOV, BII, BIV 57,58 (as highlighted) at Zone 1P (KAIG3-SCR-CO-S-19
Concreting for Large Mosque Lower 1st floor suspended slab and Beams at Axis 5-6, C-F (as highlighted
Concreting for ETFE PUMP ROOM for Plain Concrete under SOG at Zone 2E axis 02Q (as highlighted) (K
Shuttering for ETFE PUMP ROOM for Plain Concrete under SOG at Zone 2E axis 02Q (as highlighted) (K
Antitermite for ETFE PUMP ROOM forPlain Concrete under SOG at Zone 2E axis 02Q (as highlighted) (
Surface Preparation and Solvent Base Primer under foundation of Devonian garden AUH room Zone 2M
Shuttering for outer infill wall with counter fort at Axis 02S-02T (as highlighted) Zone 2F (KAIG3-SCR-
Single layer of 4mm thick modified bituminous waterproofing membrane under foundation of Devonia
Level and location for STAIR at Large Mosque, Axis E-F, 1-1.1 zone 1G (as highlighted)
Concreting for blinding under Slab of Cafeteria under croft Axis 02C-02D Zone2A (as highlighted)
Inspection and compaction test 7th layer for Backfilling for Isolated footing of Internal Building of Zo
Concreting for ETFE PUMP ROOM for blinding under SOG axis 02-AD zone 2J INNER (as highlighted) at
Concreting for Rc Foundations Retaining wall Between Axis 02G-02K (as highlighted) Zone 6&7
fFinal Inspecion for the Crescent 01 Zone 03 -1E , from Axis (01M to 01P )
Steel Reinfocements for Retaining wall front Canopy Corbel Between Axis 01AC & 01AD (as highlighted)
Shuttering for Retaining wall front Canopy Corbel Between Axis 01AC & 01AD (as highlighted) Zone 1
Level and Location for Retaining wall front Canopy Corbel Between Axis 01AC & 01AD (as highlighted) Z
Installation and Survey Report for Location and Levels of Retaining wall front canopy Corbel Anchor B
Protection layer of 4mm thick bituminous protection board for retaining wall & foundation (inner) from
Steel Reinforcements for MCPE 2 inner wall with Counterfort at Zone 2H, axis 02Z to 03I (as highlighte
Surveying for Rc Foundations Retaining wall Between Axis 02G-02K (as highlighted) Zone 6&7
"Inspection and compaction test 5th layer for Backfilling at Cretaceous Garden zone 2D,2E (as highlight
Two layers of 4mm thick modified bituminous waterproofing membrane for retaining wall & foundation (
1st Layer of Block Work laying for ETFE Pump Room # 6146 above ConcreteBeam of Zone 2D axis 02J (as
Shuttering for Retaining wall (wall) At zone 6&7 at Axis 02M-02K (as highlighted) TOW 868.90
Concreting for Retaining wall (wall) At zone 6&7 at Axis 02M-02K (as highlighted) TOW 868.90
Steel Reinfocement for Rc Foundations Retaining wall Between Axis 02G-02K (as highlighted) Zone 6&7
Shuttering for Rc Foundations Retaining wall Between Axis 02G-02K (as highlighted) Zone 6&7
Inspection and compaction test 4th layer for Backfilling at MCPE2 inner axis 02AD-02AH (as highlighted
1st Layer of Block Work laying for ETFE Pump Room # 6141 at Zone 2E axis 02Q (as highlighted) using 2
Excavation and Bed preparation for Sub Surface Drainage Pipes (dia 110 mm PP) (for Trees) At Bottom
Inspection and Compaction test for 2nd Layer for subgrade Backfilling for Internal building at AXIS 02
Sand Bedding for Low Current Lines (MH/WG/LC/01 to 04) and Fire Alarm & Security lines (MH/WG/FA
Two coat of bituminous damp proofing coating for Footings & Grade Beams @Grid (B/9-15 and D-H) Insi
Sand Bedding for Electrical Lines of Emergency (MH/WG/EM/02 to 03), between Mist & Geyser Garden,
Inspection & Compaction tests of Single Layer (Sub-Base) Backfilling on Electrical Lines of Low Vol
Two coat of bituminous damp proofing coating for Footings & Grade Beams @Grid (B/7-11and C/4-5)Insi
Inspection & Compaction tests of Single Layer (Sub-Base) Backfilling on Low Current Lines of Fire Al
Sand Bedding for Irrigation Lines (90mm dia.) from Outer Canopy 1 to 3 (from Outer side), at Physic
Coordinates & Levels for Wall & Column of Boundary Wall at Span 47 of Water Garden as highlighted
Concreting second part Roof Suspended Slab for MCPE 3 axis 02R ,03-1,03-2, Before Axis of 02-Q (as hi
Check Top Levels of Slab (+2950) for New Ticketing Booth # 4A As per Attached Highlighted Drawing's
Shuttering second part Roof Suspended Slab for MCPE 3 axis 02R ,03-1,03-2, Before Axis of 02-Q (as hi
Steel Reinforcement second part Roof Suspended Slab for MCPE 3 axis 02R ,03-1,03-2, Before Axis of 0
Inspection and Compaction test for 1st Layer for subgrade Backfilling for Internal building at AXIS 02 B
Concrete Pouring & Shuttering for Lintels of Doors & Block work & Stiffner Column's for all walls Insi
2nd Coat Cementitious Water proofing for Wing Walls (Inner Side) (Upto 15cm above FGL) of SBC-06, a
2nd Coat Cementitious Water proofing for Wing Walls (Inner Side) (Upto 15cm above FGL) of SBC-08, a
Plastering for Internal walls (All Sides) of Gents Toilet, Inside Public Toilet # 3, At highlighted area i
Concreting of Blinding of MCPE 2 Tunnel Duct at Axis 03E,03F,03G,03H, Zone 2G 2H 2J 2K (as highlighte
Block work laying and Stifiner (ST-02) for Pump Room #6089 at Zone 1C axis 01I (as highlighted) using u
Concrete Pouring & Shuttering for Slab of New Ticketing Booth # 4A As per Attached Highlighted Draw
Concreting for Retaining wall Blinding under foundation in Zone 5 at axis 01C - 01E (as highlighted)
Steel reinforcement for Bottom Slab and Starter (Kicker) for Water Fountain of Geyser Garden, inside
Inspection of Blinding Concrete under Heating and Chilled Water Line Pit for H/DH/26, H/DH/25, H/
Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 4) for Duct Bank of Fire & Secu
Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 4) for Duct Bank of Telecommu
Inspection and Compaction test for backfilling Sub-grade 3rd Layer (3 of 4) for Non potable water line P
Inspection and Compaction test for backfilling Sub-grade 6th Layer (6 of 6) around MV Line Pit C/MV/23
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 6) above gravel For Manhole
Inspection of Sand Covering to protect pipe for RO Water Line at Zone-G,K&L - As highlighted (Stock Pil
Inspection of Sand Covering to protect the pipe for Non-Potable Water Line at Zone-G,K&L - as highlight
Inspection of Blinding Concrete under Non-Potable Water Line Isolation Pit for POC-03 at Zone-B - as hi
Inspection and Compaction test for backfilling Sub-grade 3rd Layer (3 of 5) above Sand around MV Line
Inspection and Compaction test for backfilling Sub-grade 5th layer (5 of 7) around MV Line Pit G/MV19
Inspection and Compaction Test for backfilling Sub-grade 4th Layer (4 of 5) under Boulder No. WRB-51 -
Inspection and Compaction Test for backfilling Sub-grade 4th Layer (4 of 5) under Boulder No. WRB-50 -
Inspection and Compaction Test for backfilling Sub-grade 6th Layer (6 of 6) around MV Line Pit G/MV/28
Inspection of Excavation for Heating and Chilled Water Line Pit G/DH/19, G/DC/18 at Zone-G - As highli
Coordinates & Levels for Blinding under Gabions along Boundary wall Inner side, (Between B.O.H and
Coordinates & Levels for Blinding under Gabions along Boundary wall Inner side, (Between B.O.H and F
Excavation for Tree Pits (10 no's) Inside Aviary Garden, as Highlighted area in Attached Drawings.
Marking & Check for coordinates of Tree Pits (10 no's) Inside Aviary Garden, as Highlighted area in A
1st Coat Cementitious Water proofing for Wing Walls (Inner Side) (Upto 15cm above FGL) of SBC-06, a
Inspection of Plastering for Walls Inside Showers (GF-5058) at Grid between (7-9/V-X), at Management
1st Coat Cementitious Water proofing for Wing Walls (Inner Side) (Upto 15cm above FGL) of SBC-08, a
Concrete Pouring for Blinding under Low Current Handholes (MH/WG/LC/02 & 03) and Fire Alarm & S
Concrete Pouring for Blinding under Electrical Handholes of Emergency (MH/WG/EM/02), between Mis
Excavation & Bed preparation for Irrigation Lines (90mm dia.) from Outer Canopy 1 to 3 (from Outer s
Inspection for Installed Low Current Handholes of Fire Alarm & Security (MH/WG/FA/01,02 & 03), Insi
Inspection for Installed Electrical Handholes of Low Voltage (MH/WG/LV/01, 02, 03, 04, 05, 06, 07, 08
Inspection & Compaction Tests of 13th (Final) Layer Backfilling Sub Base (after 12 Layers of Subgrade)
Installation of Main Potable Water Pipes (50 mmØ-UPVC-Class-5) at Zone B - From Pit (B/PW/11) to (F
Installation of Main Fire Water Pipes (160mmØ-UPVC-Class-5) From PIT(B/F/12) to (FCC Building) at
Inspection and compaction test 3rd & 4th layer for Backfilling for Isolated footing of Internal buildin
"Inspection and Compaction Test for backfilling Sub-Grade 2nd Layer (2 of 4) for Telecommunication Line
Steel Reinforcements for walls (W28,W29,W30,W31,W32) level 869.10 & (Elevater) level 867-80 at CA
Inspection and Compaction Test 1st for Backfilling at Devonian Garden as highlighted Zone 2M, SCR-
Steel Reinforcements for Large Mosque for Upper First Floor for columns (C3A,C4,C5 ) Walls (W1), Axis C
Level and Location for blinding under Slab of Cafeteria under croft Axis 02C-02D Zone2A (as highlighted)
Shuttering for Infill Wall Stage 1(outer)Between Axis 02E-02F( (as highlighted) at Zone 2B
Surface Preparation prior to start Water Proofing for Duct Bank of Fire & Security line from C/FS/10 to
Shuttering for blinding under Strip Footing Foundation Between PC 19-21 zone1D(as highlighted) at CR
Shuttering for blinding under Slab of Cafeteria under croft Axis 02C-02D Zone2A (as highlighted)
Antitermite under Blinding of MCPE 2 Tunnel Duct at Axis 03E,03F,03G,03H, Zone 2G 2H 2J 2K (as highli
Antitermite for blinding under Slab of Cafeteria under croff Axis 02C-02D Zone2A (as highlighted)
Level and Location for blinding under Strip Footing Foundation Between PC 19-21 zone1D(as highlighte
Concreting for blinding under Strip Footing Foundation Between PC 19-21 zone1D(as highlighted) at C
Antitermite for blinding under Strip Footing Foundation Between PC 19-21 zone1D(as highlighted) at
Steel Reinforcements for STAIR at Large Mosque, Axis E-F, 1-1.1 zone 1G (as highlighted)
Level and Location under Blinding of MCPE 2 Tunnel Duct at Axis 03E,03F,03G,03H, Zone 2G 2H 2J 2K (as
Level and Location for Infill wall Beam at axis 02AO - 02AN Zone 2M (as highlighted)
Level and Location for Strip Footing blinding between PC 5-7 Zone 1A (as highlighted)
Shuttering under Blinding of MCPE 2 Tunnel Duct at Axis 03E,03F,03G,03H, Zone 2G 2H 2J 2K (as highlig
Excavation & Blinding Levels for Low Current Handholes (MH/WG/LC/02 & 03) and Fire Alarm & Secur
Concreting for Infill wall Stage1(outer) between Axis 02E-02F (as highlighted) Zone 2B
Excavation & Blinding Levels for Electrical Handholes of Emergency (MH/WG/EM/02), between Mist &
Excavation & Bed Preparation for Low Current Lines (MH/WG/LC/01 to 04) and Fire Alarm & Security
Surface preparation Prior to start cementitous Water proofing for ZONE 2D Infill wall, Ring Beam & Butr
Excavation & Bed Preparation for Electrical Lines of Emergency (MH/WG/EM/02 to 03), between Mist
Sand Bedding on Low Current Lines (MH/PG/LC/13-17) and Fire Alarm & Security lines (MH/PG/FA/09-12
Geotextile and 50mm screed under foundation of Devonian garden AUH room Zone 2M Axis 02AL to 02A
Surface preparation & Base primer coating for Foundation and walls and clomns ( C-10 ,C-11,C-25,C-
Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 5) under Boulder No. WRB-51 -
Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 5) under Boulder No. WRB-50 -
Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 5) around MV Line Pit C/MV/1
inspection and Compaction test for backfilling Sub-grade 4th Layer (4 of 6) for Non potable water line p
Protection layer of 4mm thick bituminous protection board for pile cap PC 95 and strip footing top s
"Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 5) around MV Line Pit for H
Concreting for ETFE PUMP ROOM Blinding zone 2M (as highlighted) at CRESCENT
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 4) for Duct Bank of Fire & Secu
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 4) for Duct Bank of Telecommu
Inspection and Compaction test for backfilling Sub-grade 2nd Layer (2 of 4) for Non potable water line
Inspection and Compaction test for backfilling Sub-grade 5th Layer (5 of 5) around MV Line Pit C/MV/23
"Inspection and Compaction Test for backfilling Sub-grade 10th Layer (10 of 10) for Storm Water Line
Inspection for Blinding Concrete under Fire Line Pit for B/F/13 - as highlighted
Inspection and Compaction test for backfilling Sub-grade 2nd Layer (2 of 5) above Sand around MV Line
Inspection and Compaction test for backfilling Sub-grade 4th layer (4 of 7) around MV Line Pit G/MV19
Installation of straight UPVC Conduit (Dia. 160mm) Low Voltage Ducts (Submain Cables) in the Prom
Sand Bedding on Electrical Lines of Low Voltage (MH/PG/LV/09-12) and Emergency (MH/PG/EM/10-13),
Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 3 ) above sand MV Line Pit -
Surface Preparation and Application of 1 Coat Primer, Damp Proof (1st Coat & 2nd Coat) and Protection
Inspection & Compaction tests of Single Layer (Sub-Base) Backfilling on Electrical Line of LV Subm
Inspection and Compaction Test for backfilling Sub-grade 5th Layer (5 of 6) around MV Line Pit G/MV/28
Installation of straight UPVC Conduit (Dia. 160mm) MV Ductbank LL/D-MV/09 from MH no. (L/MV/
Installation of Straight PVC Conduit (Dia. 25mm) and Box for Voice Data (WIFI) in the Promenade & C
Installation of Straight PVC Conduit (Dia. 25mm) and Boxes for Fire Alarm (Speaker) in the Promenad
Single layer of 4mm thick modified bituminous waterproofing membrane for pile cap PC 95 and stri
Surface preparation & Base primer coating for pile cap PC 95 and strip footing top side axis 02-D t
Inspection & Compaction tests of 5th Layer (Sub-Grade) Backfilling (Out of 6 layers) along the Bounda
Surface Preparation Prior to Backfilling, Between Geyser Garden & Aviary Garden & Boat Garden, at h
Excavation for Tree Pits (17 no's) Inside Aviary Garden, as Highlighted area in Attached Drawings.
Marking & Check for coordinates of Tree Pits (17 no's) Inside Aviary Garden, as Highlighted area in A
Concrete Pouring & Shuttering for Columns (2nd lift, above the level +872.35) of Boundary Wall @ Gri
Inspection for Repair by Nitomortar TC2000 Epoxy, for Inner Surfaces of tank of Wet Well F, Inside W
Surface Preparation prior to Repair by Nitomortar TC2000 Epoxy, for All Inner Surface of tank Wet Wel
Installation of PVC Conduit (Dia.25mm) & Boxes for Fire Alarm (Speaker) at the Large Mosque First Fl
Pre insulated Chiled Water Pipes (S&R) 150mmØ & 100mmØ( laying ,Aligment ,Leveling and fit up) F
Inspection and Compaction Test 1st and 2nd Layer for Backfilling Strip Footing at Crescent between P
Concreting for Suspended slab at Duct tunner for MCPE 3 at Zone 2E 2F,Axis 03A (as highlighted) TOC
Installation and Survey Report for Location and Levels of Retaining wall front canopy Corbel Anchor Bo
Level and Location for Retaining wall front Canopy Corbel Between Axis 01AE, 01AF, 01AG (as highlight
Shuttering for Retaining wall front Canopy Corbel Between Axis 01AE, 01AF, 01AG (as highlighted) Zone
Steel Reinfocements for Retaining wall front Canopy Corbel Between Axis 01AE, 01AF, 01AG (as highlig
Surface preparation & Base primer coating for Infill wall Between BOI 126_127 BII 128_127_126 zone 2R
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 4) for Non potable water line P
Inspection of Sand bedding under pipe for Heating and Chilled Water Line at Zone-H - As highlighted (St
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 5) above Sand around MV Line
Inspection and Compaction test for backfilling Sub-grade 3rd layer (3 of 7) around MV Line Pit G/MV19
"Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 4 ) above Sand for Non potabl
Inspection and Compaction test for backfilling Sub-grade 3rd Layer (3 of 4) for Fire&Security Line Pit
Inspection and Compaction test for backfilling Sub-grade 3rd Layer (3 of 4) for Telecommunication Line
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 5) around MV Line Pit C/MV/
Inspection and Compaction test for backfilling Sub-grade 4th Layer (4 of 5) around MV Line Pit C/MV/23
"Inspection and Compaction Test for backfilling Sub-grade 9th Layer (9 of 9) for Storm Water Line fro
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 3) for Duct Bank of Fire & Secu
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 3) for Duct Bank of Telecommu
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 5) under Boulder No. WRB-51 -
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 5) under Boulder No. WRB-50 -
Inspection of Concrete Pouring for Footing of MV Line Pulling Pit - L/MV/11 and L/MV/14 at Zone-L (As
Inspection of Formwork for Footing of MV Line Pulling Pit - L/MV/11 and L/MV/14 at Zone-H&L (As High
Inspection for Blinding Concrete under MV Line Pulling Pit L/MV/14 and L/MV/11 - as highlighted
Inspection of Concrete Pouring for Wall of MV Line Pulling Pit - D/MV/17, D/MV/18, D/MV/31, D/MV/33
Inspection of Formwork for Wall of MV Line Pulling Pit - D/MV/17, D/MV/18, D/MV/31, D/MV/33 at Zone
Inspection and Compaction Test for backfilling Sub-base 1st Layer (1 of 1) under Boulder No. WRB-52 -
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 6) for Non potable water line p
Shutering for ETFE PUMP ROOM #6113 Axis 02-W, ZONE 2G (as highlighted) at CRESCENT ,KAIG3-SCR-C
Antitermite Application under blinding ETFE PUMP ROOM #6113 Axis 02-W, ZONE 2G (as highlighted
Inspection and compaction test 3rd layer for Backfilling at MCPE2 inner axis 02AD-02AH (as highlighted
Inspection and compaction test 7th layer continuation backfilling for Internal Building for Zone 1N Axi
Installation of Aluminium Flashing & Sealent for MCPE 2 outer wall at axis 03E to 02AH, Zone 2G 2H 2J 2
Inspection and compaction test 6th layer for Backfilling for Isolated footing of Internal building of Z
Shuttering for MCPE 1 tunnel wall at axis 03-1 to 03-2, 03U, 03S, 03T (as highlighted) upto 874.50
Level and Location for MCPE 1 tunnel wall at axis 03-1 to 03-2, 03U, 03S, 03T (as highlighted) upto 874.
Single Layer of 4mm thick Modified Bitumious Water Proofing Membrane for strip footing Between Axis
Block Work Laying for ETFE pump room # 6146 upto Lintel Beam at zone 2D axis 02J (as highlighted)
Protection Layer of 4mm thick Bituminous Protectiion Board for boi bov (72, 73,74,75,76 77) upto 870.
Single layer of 4mm thick Modified Bituminous WaterProofing Membrane for boi bov (72, 73,74,75,76 7
Installatin of Protection Layer of 4mm thick Bituminous Protection Board for top pf Pile Cap (PC 111,
Installatin of single Layer of 4mm thick Modified Bituminous Water Proofing Membrane for top pf Pil
"Inspection and compaction test 4th layer for Backfilling at Cretaceous Garden zone 2D,2E (as highlight
Cementitious Water Proofing for Under Foundation of Retaining Wall at Axis 02I to 02L of ZONE 6&7 (As
Excavation and surface preparation of Cretacous Garden (as highlighted) Zone 2E (soak away)
Materials Sampling for Backfilling Materials (Test Required: Soil Classification, Proctor Value) Qty. = 5
Concreting for Infill inner wall at Crescent between (02-R & 02-S) 1st Stage (As highlighted) ZONE 2F
Shuttering for Blinding for Retaining Wall at axis 02/M to 02/K Zone 6 & 7 at CRESCENT (as highlighte
Installed Base Extrusion and Base Seal between Axis 02/AE - 02/AF.
Installed Base Extrusion and Base Seal between Axis 02/AF - 02/AG.
Concreting for MCPE 1 tunnel wall at axis 03-1 to 03-2, 03U, 03S, 03T (as highlighted) upto 874.80
Inspection of Plastering for Walls Inside Showers (GF-5057) at Grid between (7-9/S-V), at Management
Stack Boulders Installed Layer at level +876.300, along Open Channel (Aviary garden Side), at Wadi #
Stack Boulders Installed Layer at level +875.900, along Open Channel (Aviary garden Side), at Wadi #
Inspection for Installed Low Current Handholes (MH/WG/LC/05, 06, 07 & 09) and Fire Alarm & Security
Inspection for Installed Electrical Handholes of Low Voltage (MH/WG/LV/22, 27 & 28) and Emergency
Inspection & Compaction Tests of 12th Layer Backfilling Subgrade (Out of 13 Layers) for SBC-08 (Behin
Inspection & Compaction tests of 4th Layer (Sub-Grade) Backfilling (Out of 6 layers) along the Bounda
Inspection of Levels for Dome of New Ticketing Booth # 2A, As per Attached Highlighted Drawing's.
Coordinates & Levels of Kicker (2nd Lift) of Boundary Wall at Span 47 of Water Garden, as highlighted
Concrete Pouring for Dome of New Ticketing Booth # 2A, As per Attached Highlighted Drawing's.
Concrete Pouring & Shuttering for Kicker (2nd Lift) of Boundary Wall at Span 47 of Water Garden, as h
Steel Reinforcement for Wall & Column of Boundary Wall at Span 47 of Water Garden as highlighted a
Installation of straight PVC Conduit (Dia. 25mm) and Boxes for Fire Alarm (Break Glass, Flashing Bea
Installation of PVC Conduit (Dia. 25mm) and Boxes for Fire Alarm (Smoke Detector & Voice Alarm) at
Installation of PVC Conduit (Dia. 25mm) & Boxes for Lighting System (Lighting Fixture) at New Ticket
Installation of straight UPVC Conduit (Dia. 160mm) Medium Voltage Ductbank DD/D-MV/30 from Manh
Installation of straight UPVC Conduit (Dia. 160mm) Medium Voltage Ductbank DD/D-MV/31 from Manh
Installation of straight UPVC Conduit (Dia. 160mm) Medium Voltage Ductbank DD/D-MV/04 from Manh
Installation of straight UPVC Conduit (Dia. 160mm) Medium Voltage Ductbank DD/D-MV/09 from Manh
' Soak Way Pipe Installation of Foul Water Line for (160&110mmØ - UPVC- Class 4) from (FW-A-13-6).
'Bedding of Gravel 3/8" and Geotextile Surrounding Foul Water Line for (160&110mmØ - UPVC- Class
Inspection of Blinding Concrete under Non-Potable Water Line Isolation Pit for POC-33, POC-34, POC-35
Inspection for Installation of Fire & Security Line Pit - B/FS/41, C/FS/10, C/FS/06, C/FS/04, C/FS/35 - as h
Inspection for Installation of Telecommunication Line Pit - B/TL/11, B/TL/18, C/TL/71, C/TL/27 - as highl
Surface Preparation prior to start backfilling for Non potable water line Pit POC-14 at Zone-B - As Highli
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 5) around MV Line Pit C/MV/1
Inspection and Compaction test for backfilling Sub-grade 4th Layer (4 of 4) around MV Line Pit C/M
inspection and Compaction test for backfilling Sub-grade3rd Layer (3 of 6) for Non potable water line pi
Inspection and Compaction test for backfilling Sub-grade 3rd Layer (3 of 5) around MV Line Pit C/MV/23
"Inspection and Compaction Test for backfilling Sub-grade 8th Layer (8 of 9) for Storm Water Line fro
"Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 5) around MV Line Pit for H
Inspection of Sand bedding under pipe for Fire Water Line at Zone-C - as highlighted (Stock Pile# 132)
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 4) for Duct Bank of Fire & Secu
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 4) for Duct Bank of Telecommu
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 5) under Boulder No. WRB-51 -
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 5) under Boulder No. WRB-50 -
Inspection of backfilling Sand 2nd Layer (2 of 3) around MV Line Pit G/MV23 at Zone-G- As Highlighted (
Inspection and Compaction test for backfilling Sub-grade 2nd layer (2 of 7) around MV Line Pit G/MV19
Inspection and Compaction test for backfilling Sub-grade 4th layer (4 of 6) for Non potable water line p
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 3 ) above sand MV Line Pit -
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 4 ) above Sand for Non potabl
Inspection and Compaction test for backfilling Sub-grade 2nd Layer (2 of 4) for Fire&Security Line Pit
Inspection and Compaction test for backfilling Sub-grade 2nd Layer (2 of 4) for Telecommunication Lin
Inspection of Steel Reinforcement for Footing and Wall of MV Line Pulling Pit - L/MV/11 and L/MV/14 a
Inspection of Blinding Concrete under Non-Potable Water Line Isolation Pit for POC-04 at Zone-B - as hi
Inspection for Installation of Precast Slab for MV Line Pit - G/MV/02, H/MV/29, H/MV/06 and H/MV/0
Inspection of Formwork for the Upstand of SBC-07 - As Highlighted
Inspection of Steel Reinforcement for the Upstand of SBC-07 - As Highlighted
Inspection and Compaction test for backfilling Sub-grade 3rd Layer (3 of 4) around MV Line Pit C/M
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 5) above Gravel for Storm W
Inspection and Compaction test for Backfilling Sub-grade 1st Layer (1 of 5) above Gravel around Manhol
Installation of straight UPVC Conduit (Dia. 160mm) Medium Voltage Ductbank EE/D-MV/09 from Manh
Installation of straight UPVC Conduit (Dia. 160mm) Medium Voltage Ductbank EE/D-MV/01 from Manh
Installation of straight UPVC Conduit (Dia. 160mm) Medium Voltage Ductbank DE/D-MV/02 from Manh
Installation of straight UPVC Conduit (Dia. 160mm) Medium Voltage Ductbank DE/D-MV/01 from Manh
Installation of straight UPVC Conduit (Dia. 160mm) Medium Voltage Ductbank from Manhole no. (D/M
Installation of straight UPVC Conduit (Dia. 160mm) Medium Voltage Ductbank DD/D-MV/13 from Manh
Installation of EMT Conduit (Dia. 3/4, 1 inch.) and Box (Ceiling Mounted) for Lighting (E1, E1/CE,
Steel reinforcements for Suspended slab at Duct tunner for MCPE 3 at Zone 2E 2F, Axis 03A (as highlig
Surface preparation & Solvent Base primer coating for boi bov (72, 73,74,75,76 77) upto 870.00at ZONE
Surface preparation and Solvent Base primer for MCPE 2 outer Wall Upto 871.00, Zone 2H, Axis 03I-1 to
"Inspection and compaction test 3rd layer for Backfilling at Cretaceous Garden zone 2D,2E (as highlight
Inspection and compaction test 2nd layer for MCPE2 UNDER SHAFT Zone 2J 2H 2G 2K (as highlighted
Surface Preparation and Solvent base primer for Devonian Garden Footing at Zone 2M (as highlighted)
Two layers of 4mm thick modified bituminous waterproofing membrane for MCPE 2 outer Wall Upto 871.
Protection layer of 4mm thick bituminous protection board for MCPE 2 outer Wall Upto 871.00, Zone 2H,
Inspection and compaction test 1st & 2nd layer of Gravel Back filling forRetaining wall at AXIS 01G - 01K
Concreting for TIP frist floor slab Axis 02BC , 02-1 TO 02-2 (as highlighted) Zone 2R
Surface Preparation Prior to start Backfilling for Internal building at AXIS 02 BB - 02 BC Zone 2R (as high
1st Layer of Block Work laying for ETFE Pump Room # 6144 at Zone 2D axis 02L (as highlighted) using 2
1st layer Layout for ETFE Pump Room # 6046 at Zone 2N axis 02A (as highlighted) using 20cm
Steel Reeinforcements for RC Strip Footing Between ( PC 194-PC 196 ) at Axis 02BA-02AZ zone 2R (as h
Installation of Main Potable Water Pipes (200mmØ-UPVC-Class-5) at Zone G- From Pit (G/PW/01) to
Installation of Main Fire Water Pipes (250mmØ-UPVC-Class-5) From PIT(G/F/02) to Point (647501.41
Pipe Installation of cast iron drainage pipe,under craft At Crescent 2 zone 2A; (cast iron dia 110,
Inspection of Sand bedding under pipe for Non-Potable Water Line at Zone G - as highlighted (Stock Pile
Inspection of Sand bedding under pipe for RO Water Line at Area-D - As highlighted (Stock Pile# 132)
Inspection of backfilling Sand 1st Layer (1 of 3) around MV Line Pit G/MV23 at Zone-G- As Highlighted (S
Inspection and Compaction test for backfilling Sub-grade 1st layer (1 of 7) around MV Line Pit G/MV19
Inspection and Compaction test for backfilling Sub-grade 3rd layer (3 of 6) for Non potable water line p
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 3 ) above sand MV Line Pit -
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 4 ) above Sand for Non potabl
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 4) for Fire&Security Line Pit
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 4) for Telecommunication Line
Surface Preparation prior to start backfilling around MV Line Pit C/MV/13 and C/MV/20 at Zone-C- As H
inspection and Compaction test for backfilling Sub-grade 2nd Layer (2 of 6) for Non potable water line p
Inspection and Compaction test for backfilling Sub-grade 2nd Layer (2 of 5) around MV Line Pit C/MV/23
"Inspection and Compaction Test for backfilling Sub-grade 7th Layer (7 of 9) for Storm Water Line fro
"Inspection of backfilling Gravel 5th Layer (5 of 5) for Storm Water Line Manhole MH-M-03 - As Highlig
"Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 5) around MV Line Pit for H
Inspection of Excavation for Heating and Chilled Water Line at Zone-H - As highlighted
Excavation for Fire Water Line at Zone-C - as highlighted
Soil Preparation under Boulder No. WRB- 052
Soil Preparation under Boulder No. WRB- 051
Soil Preparation under Boulder No. WRB- 050
Inspection for Installation of Manhole Base, Upvc Pipe Connection and Rings (Riser) for MH-O-11 and Gu
Inspection of Concrete (Plain) Pouring for Duct Bank of Fire & Security line from B/FS/21 to C/FS/10 at
Inspection of Concrete (Plain) Pouring for Duct Bank of Telecommunications line from B/TL/42 to B/TL/
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 3) for Duct Bank of Fire & Secu
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 3) for Duct Bank of Telecommu
Inspection of Excavation for Non-Potable Water Line Isolation Pit - POC- 33, POC- 34, POC- 35 at Zone-H
Stack Boulders Installed Layers at levels +874.40 & +874.80, along Open Channel (Aviary Garden Side
Stack Boulders Installed Layers at levels +877.48, Between Boat garden and SBC-08, at Wadi # 3, Ins
Inspection & Compaction Tests of 11th Layer Backfilling Subgrade (Out of 13 Layers) for SBC-08 (Behin
Inspection & Compaction tests of 3rd Layer (Sub-Grade) Backfilling (Out of 6 layers) along the Bounda
Concrete Pouring for Blinding Under Low Current Handholes (MH/PG/LC/12) and Fire Alarm & Security
Inspection & Compaction tests of Single Layer (Sub-Grade) Backfilling prior to Sand Bedding for Low
Inspection & Compaction tests of Single Layer (Sub-Grade) Backfilling prior to Sand Bedding for Ele
Single layer 4mm thk Modified Bituminous Water Proofing Membrane on Foundations and Walls (Both si
Solvent Base Primer Coating Prior to Membrane Water proofing on Foundations and Walls (Both sides)
Surface Preparation prior to Repair by Nitomortar TC2000 Epoxy, for All Inner Surface of tank of Wet
Concrete Pouring & Shuttering for Columns (25 no's) (3rd lift above the level +875.55) of Boundary Wa
Installation of Protection layer of 4mm thick Bituminous Board for Under Foundation of Retaining Wall a
Coordinates & Levels for Columns (25 no's) (3rd lift above the level +875.55) of Boundary Wall @ Grid
Installation of 1st & 2nd layer of 4mm thick Modified Bituminous Waterproofing Membrane for Under F
Surface preparation & Solvent Base primer coating for Under Foundation of Retaining Wall at Axis 02I t
1st Layer of Block Work laying for ETFE Pump Room # 6050 at Zone 2M axis 02AN (as highlighted) using
Block Work laying for ETFE Pump Room # 6050 upto lintel beam at Zone 2M axis 02AN (as highlighted)
Level and Location for RC Strip Footing Between ( PC 194-PC 196 ) at Axis 02BA-02AZ zone 2R (as highl
Concreting for RC Strip Footing Between ( PC 194-PC 196 ) at Axis 02BA-02AZ zone 2R (as highlighted)
Shuttering for RC Strip Footing Between ( PC 194-PC 196 ) at Axis 02BA-02AZ zone 2R (as highlighted)
Steel Reinforcements for inner Infill wall at zone 2C axis 02H to 02I (AS HIGHLIGHTED) KAIG3-SCR-CO-S
Block Work laying for ETFE Pump Room # 6046 upto Lintel beam at Zone 2N axis 02ARas highlighted) u
Inspection and compaction test 4th layer for Backfilling for Isolated footing of Internal building of Z
Concreting for strip footing between PC 23 & PC 25 zone 1D at CRESCENT AXIS 01-M TO 01-L (as highlig
Level and Location for Infill wall on BOI 122 Axis 02AX (as highlighted) Zone 2Q
Concreting Infill wall on BOI 122 Axis 02AX (as highlighted) Zone 2Q
Shuttering for Infill wall on BOI 122 Axis 02AX (as highlighted) Zone 2Q
'Pipe Installation of Strom Water pipe OUT FALL-O for ( Dia315mm Ø- UPVC Pipes-Class 4 ) for Storm
Steel Reinforcement for Infill wall on BOI 122 Axis 02AX (as highlighted) Zone 2Q
'Bedding of Gravel 3/8" and Geotextile surrounding in pipes ( Dia315mm Ø- UPVC Pipes-Class 4 ) for
Surface preparation & Solvent Base primer coating for strip footing Between Axis 02K-02L upto 870.00
Insallation of Protection Layer of 4mm Thick Bituminous Protection Board for (inner) Side of Infill wa
Surface preparation & Solvent Base primer coating for top pf Pile Cap(PC 111, PC113, PC115, PC117, PC
Installation of Single layer of 4mm thick Modified Bituminous water proofing membrane for (inner) Sid
Concreting for Infill inner wall at Crescent between (02-AY & 02-AX) (As highlighted) ZONE 2Q
concreting for Infill wall (inner) between BII 123-124 Axis 02AZ-02AY (as highlighted) Zone 2Q
Inspection and compaction test 7th layer for Backfilling at Internal Building at zone 2A (as highlighted)
Installation of PVC Conduit (Dia. 25mm) & Boxes for Power System (Disconnect Switch) at New Ticket
Installation of straight UPVC Conduit (Dia. 160mm) Low Voltage Ducts (Submain Cables) at Crescent-
Installation of straight UPVC Conduit (Dia. 110mm) Low Voltage Ducts (Submain Cables) in ETFE ro
Final Inspection for the Crescent 01, Zone 1-1L,1M&1N, fromAxis (01AG to 01AP )
Inspection of Grouting (Horizontal & Vertical Joints) for Rock Boulder - WRB-025 for All Layers
Installation of Rock and Boulder in Wadi-03 (Right Side) - 9th layer (9 of 9)
Installation of Rock and Boulder in Wadi-03 (Right Side) - 8th layer (8 of 9)
Installation of Rock and Boulder No. WRB-25 - 4th layer (4 of 4)
Installation of Rock and Boulder No. WRB-25 - 3rd layer (3 of 4)
Installation of Rock and Boulder No. WRB-25 - 2nd layer (2 of 4)
Inspection of Excavation for Heating and Chilled Water Line Pit for H/DH/26, H/DH/25, H/DH/15, H/
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 5) around MV Line Pit C/MV/23
"Inspection and Compaction Test for backfilling Sub-grade 6th Layer (6 of 9) for Storm Water Line fro
"Inspection of backfilling Gravel 4th Layer (4 of 4) for Storm Water Line Manhole MH-M-02, MH-M-03,
Inspection of backfilling Sand 2nd Layer (2 of 4) around MV Line Pit - G/MV/02 at Zone-G- As Highlighted
"Inspection of backfilling Sand 2nd layer (2 of 3) for Non potable water line pit POC-41 & POC-42 at Zon
Inspection and Compaction test for backfilling Sub-grade 2nd layer (2 of 6) for Non potable water line p
"INSPECTION FOR INSTALLATION OF ALL RINGS (RISER) FOR - FW-A-3-7.3 & FW-A-3-7.4 (As Highlighted)
INSPECTION FOR MANHOLE BASE INSTALLATION AND UPVC PIPE CONNECTION FOR - FW-A-3-7.3 & FW-A-3
"Inspection of backfilling Gravel 3rd Layer (3 of 4) for Storm Water Line Manhole MH-M-02, MH-M-03,
"Inspection and Compaction Test for backfilling Sub-grade 5th Layer (5 of 9) for Storm Water Line fro
Inspection and Compaction test for backfilling Sub-grade 3rd Layer (3 of 3) above Sand Covering for No
Inspection of backfilling Sand 1st Layer (1 of 4) around MV Line Pit - G/MV/02 at Zone-G- As Highlighted
"Inspection of backfilling Sand 1st layer (1 of 3) for Non potable water line pit POC-41 & POC-42 at Zone
Inspection and Compaction test for backfilling Sub-grade 1st layer (1 of 6) for Non potable water line p
Surface Preparation prior to start backfilling around MV Line Pit G/MV23 and G/MV/19 at Zone-G- As Hi
Inspection of Sand bedding under pipe for MV Line from H/MV/08 to H/MV/31 at Zone-H - as highlighted
Inspection of Sand bedding under pipe for Heating and Chilled Water Line at Zone-H - As highlighted (St
Inspection of Sand bedding under pipe for Fire Water Line at Zone-H - as highlighted (Stock Pile# 132)
Inspection of Sand bedding under pipe for Potable Water Line at Zone-H - as highlighted (Stock Pile# 13
Inspection for Installation of Precast Slab for MV Line Pit - F/MV/08 and G/MV/38 at Zone-F&G - As H
"Inspection and Compaction Test for backfilling Sub-grade 4th Layer (4 of 9) for Storm Water Line fro
Shuttering for inner Infill wall Beam at axis 02AQ - 02AR Zone 2N (as highlighted)
1st & 2nd layer of 4mm thick APP modified bituminous waterproofing membrane under Foundation of Re
Surface preparation & Solvent Base primer coating for Retaining wall at AXIS 01M to 01K (1.8m from
Level and Location for Excavation OF MCPE2 Duct Tunnel at Axis 3E (as highlighted) Zone 2G ,2H,2J,2K
Level and Location for Excavation and surface preparation of Cretacous Garden (as highlighted) Zone 2E
Steel Reinforcements for ETFE PUMP ROOM Slab on Grade at axis 02-Q of zone 2E (as highlighted) at
Shuttering for ETFE PUMP ROOM Slab on Grade at axis 02-Q of zone 2E (as highlighted) at CRESCENT (
Level and location for Excavation of Strip footing between PC 19-21 (as highlighted) Zone 1D
Inspection and Compaction test for backfilling Sub-grade 4th layer (4 of 4) above gravel For Manhole
Level and Location for Buttress Head at BOI, BOV, 58 (as highlighted) at Zone 1P (KAIG3-SCR-CO-S-198-0
Concreting for Infill wall Beam at axis 02P - 02Q Zone 2E (as highlighted)
Concrete Pouring & Shuttering for Columns of Boundary Wall @ Grid (A/6-12B), at Energy Center 2, as
"Concreting for Infill wall for 2 infill walls Buttress 71 axis ( 02/J ) & Butterss 72 axis ( 02/K ) (as highlig
Surface Preparation Prior to Water proofing on Foundation and Wall (Both sides) at grid (14/A-B), In
Concreting of (2) Blinding for Internal Building at Zone 1A, 1B (as highlighted) Axis 01D-01C
Inspection & Compaction tests of 2nd (Final) Layer (Sub-Grade) Backfilling (Out of 2 layers) (Upto Le
Steel Reinforcements for Diaphragm Wall BEAM axis 02AQ from 877.00 to 877.50 (as highlighted) Zone
Inspection & Compaction tests of 7th Layer Backfilling (Sub-Grade) (Out of 13 layers) Between Bounda
Shuttering for Diaphragm Wall BEAM axis 02AQ from 877.00 to 877.50 (as highlighted) Zone 2N
Inspection & Compaction tests of 2nd Layer (Sub-Grade) Backfilling (Out of 6 layers) along the Bounda
Concreting for Diaphragm Wall BEAM axis 02AQ from 877.00 to 877.50 (as highlighted) Zone 2N
Warning Tiles & Tape on Electrical Line of LV Submain Cable Containment & From Pulling Pit to (MH
Level and Location for Diaphragm Wall BEAM axis 02AQ from 877.00 to 877.50 (as highlighted) Zone 2N
Inspection & Compaction Tests of 10th Layer Backfilling Subgrade (Out of 13 Layers) for SBC-08 (Behin
Shuttering for Diaphragm Wall axis 02AQ (2nd part) from 874.00 to 877.50 (as highlighted) Zone 2N
Surface Preparation prior to Backfilling between Footings & Garde Beams (At Bottom of Blinding level
Excavation and Blinding Levels for Low Current Handholes (MH/PG/LC/12) and Fire Alarm & Security (
Excavation & Bed Preparation for Low Current Lines (MH/PG/LC/06-08 and 11-13) and Fire Alarm & Sec
Excavation & Bed Preparation for Electrical Lines of Emergency (MH/PG/EM/07-08), Inside Physic Gard
Concreting for Diaphragm Wall axis 02AQ (2nd part) from 874.00 to 877.50 (as highlighted) Zone 2N
Concreting for ETFE PUMP ROOM Slab on Grade at axis 02-Q of zone 2E (as highlighted) at CRESCENT (
Level and Location for ETFE PUMP ROOM Slab on Grade at axis 02-Q of zone 2E (as highlighted) at CR
Shuttering for MCPE 3 ,Suspended Slab of Duct Tunnel at axis 03-B , zone 2E &2F (as highlighted)
Concreting for MCPE 3 ,Suspended Slab of Duct Tunnel at axis 03-B , zone 2E &2F (as highlighted)
Steel Reinforcements for MCPE 3 Suspended Slab of Duct Tunnel at axis 03-B , zone 2E &2F (as highlight
Level and Location for MCPE 3 For Suspended Slab of Duct Tunnel at axis 03-B , zone 2E &2F (as highlig
Inspection and compaction test 1st layer for MCPE2 UNDER SHAFT Zone 2J 2H 2G 2K (as highlighted)
Surface Preparation Prior to start Backfilling for MCPE2 UNDER SHAFT Zone 2J 2H 2G 2K (as highlight
Excavation & Bed Preparation for Electrical Lines of Low Voltage (MH/PG/LV/09-12) and Emergency (
Excavation & Bed Preparation for Low Current Lines (MH/PG/LC/13-17) and Fire Alarm & Security line
Concrete Pouring & Shuttering for walls of New Ticketing Booth # 6A, As per Attached Highlighted Dr
Primer Coating prior to Damp proofing for Footings & Garde Beams @ Grid (B/7-11 and C/4-5), Inside
Concrete Pouring & Shuttering for Kicker (1st Lift) of Boundary Wall at Span 47 of Water Garden, as h
Inspection for Window and Door openings for New Ticketing Booth # 6A As per Attached Highlighted
Coordinates & Levels for walls of New Ticketing Booth # 6A, As per Attached Highlighted Drawing's.
Coordinates & Levels of Kicker (1st Lift) of Boundary Wall at Span 47 of Water Garden, as highlighted
Inspection & Compaction tests of 1st Layer (Sub-Grade) Backfilling (Out of 6 layers) along the Bounda
Inspection & Compaction tests of 2nd (Final) Layer (Sub-Grade) Backfilling (Out of 2 layers) (Upto Le
Inspection & Compaction tests of 1st Layer (Sub-Grade) Backfilling (Out of 2 layers) along Foundation
Inspection & Compaction Tests of 9th Layer Backfilling Subgrade (Out of 10 Layers) for SBC-08 (Behind
Inspection & Compaction Tests of 8th Layer Backfilling Subgrade (Out of 10 Layers) for SBC-08 (Behind
Sand Cover & Protection for Electrical Line of LV Submain Cable Containment & From Pulling Pit to
Warning Tiles and Tape on Low Current Lines of Telecom (from MH/ZG/TC/06 to 07), at Maze Garden,
Level and Location for Infill wall inner at Crescent between axis (02-AG & 02-AH) (As highlighted) ZONE
Steel reinforcements for Retaining wall (wall) At zone 6&7 at Axis 02M-02K (as highlighted) TOW 868.90
Surface Preparation and Solvent Base Primer for (inner) Side of Infill wall at Zone 2B between axis 02D
Anti Termite Application under Plain Concrete of Devonian Garden under AHU Foundation at zone 2M (as
Shuttering for Plain Concrete of Devonian Garden under AHU Foundation at zone 2M (as highlighted) (3
Concreting for Plain Concrete of Devonian Garden under AHU Foundation at zone 2M (as highlighted) (3
Level and location for Excavation at Devonian Garden AHU Foundation at zone 2M (as highlighted) (3rd
Level and location for Plain Concrete of Devonian Garden under AHU Foundation at zone 2M (as highligh
Inspection and compaction test 5th layer for Backfilling for Isolated footing of Internal building of Zo
Inspection and compaction test 6th layer continuation backfilling for Internal Building for Zone 1N Axi
"Inspection and compaction test 1st & 2nd layer for Backfilling at Cretaceous Garden zone 2D,2E (as hi
Inspection and compaction test 2nd layer for Backfilling at MCPE2 inner axis 02AD-02AH (as highlighted
Level and Location for Infill wall (inner) between BII 123-124 Axis 02AZ-02AY (as highlighted) Zone 2Q
Shuttering for Infill wall (inner) between BII 123-124 Axis 02AZ-02AY (as highlighted) Zone 2Q
Level and Location for MCPE 3 WALL at axis 02R & 02S (as highlighted) Zone 2E & 2F level 874.80 & 874
Shuttering for MCPE 3 WALL at axis 02R & 02S (as highlighted) Zone 2E & 2F level 874.80 & 874.85
Concreting for MCPE 3 WALL at axis 02R & 02S (as highlighted) Zone 2E & 2F level 874.80 & 874.85
Concreting for ETFE PUMP ROOM for Mass Concrete under SOG at Zone 2E axis 02Q (as highlighted) (
CHB laying and Stifiner (ST-02) for Pump Room at Zone 1C axis 01I (as highlighted) using 20cm CHB upt
Installation of Soak Away Base (SA-03) at north administration building Zone 2R
Surface Preparation and Base Primer Coating for Foundations, Columns and Walls (C70, C71, C56, C57, W
Protection layer of 4mm thick bituminous protection board for Foundations, Columns and Walls (C70, C7
Shuttering for Infill wall inner at Crescent between axis (02-AG & 02-AH) (As highlighted) ZONE 2K
Concreting for Infill wall inner at Crescent between axis (02-AG & 02-AH) (As highlighted) ZONE 2K
Installation of Single layer of 4mm thick Modified Bituminous Waterproofing Membrane for Under strip
Installation of Protection layer of Geotextile and Screed for Under strip footing beween (PC 194- PC 196)
Surface preparation & Solvent Base primer coating for Under strip footing beween (PC 194- PC 196) at A
Surface preparation & Solvent Base primer coating for ETFE Pump Room no 6113 of ZONE 2G upto level
Installation of Single layer of 4mm thick Modified Bituminous Waterproofing Membrane for ETFE Pum
Singe layer of 4mm thick modified bituminous waterproofing membranbe for RC Strip footing between
Steel Reinforcement for Tunnel 1part C Slab (As Highlighted ) Zone 2H
Final Inspection for the Crescent 01 , Zone 2-1H from Axis 01W to 01AA
Final Inspection for the Crescent 01 , Zone 1-1J &1K , from Axis 01AA to 01AG
Surface preparation & paint Touchup inspection for the Metal Cladding in Crescent 01, Zone-3 1E , Axi
Installation of Protection layer of 4mm Thick Bituminous Protection Board for ETFE Pump Room no 6113
Installation of straight PVC Conduit (Dia. 25mm) & Boxes for Power System (Socket Outlet, Fused Con
Installation of straight PVC Conduit (Dia. 25mm) and Boxes for Fire Alarm (Break Glass, Flashing Bea
Installation of straight PVC Conduit (Dia. 25mm) and Boxes for Security (CAM) at Site Tower No. 2 as
Installation of straight PVC Conduit (Dia. 25mm) and Boxes for Voice and Data (WIFI, CAM) at Site T
Surface preparation prior to Backfilling along the Boundary Wall (Inner side) Span 12, inside Water G
Stone Cladding for Boundary Walls (Outer faces) @ Span 74 and 75, as Attached Highlighted Drawing'
Stone Cladding for Boundary Walls (Inner faces) @ Span 74 and 75 and Columns C74, C75 and C76 (All
Stack Boulders Installed Layers at levels +877.08, Between Boat garden and SBC-08, at Wadi # 3, Ins
Stack Boulders Installed Layers at levels +876.68, Between Boat garden and SBC-08, at Wadi # 3, Ins
Completion of Stacked Boulders with Grouting for All Layers, Near SBC-08, at Wadi 3 (Part 3 Aviary g
Completion of Stacked Boulders with Grouting for All Layers, Near SBC-08, at Wadi 3 (Part 2 Boat gar
Stone Cladding for Boundary Wall (Inner side) beside Outer Canopy 3, (Remaining Part) at Physic gard
Protection Layer of 4 mm Thk. Bitomenous Protection Board for Footings & Garde Beams @ Grid (1-3/C-
Surface Preparation prior to Waterpoofing for Footings & Garde Beams @ Grid (B/7-11 and C/4-5), Ins
Concrete Pouirng & Shuttering for Columns (above the level +872.35) of Boundary Wall @ Grid (28-30/
Coordinates & Levels for Columns (above the level +872.35) of Boundary Wall @ Grid (28-30/M-N) (20 n
Installation of Rock and Boulder in Wadi-03 (Right Side) - 7th layer (7 of 7)
Inspection for Installation of Non-Potable Water Line Pit - POC-29, POC-41 and POC-42 - as highlighted
Inspection for Blinding Concrete under Non-Potable Water Line Isolation Pit for POC-45 at Zone-K - as h
Surface Preparation prior to start backfilling for Non potable water line pit POC-29, POC-41 and POC-42
Surface Preparation prior to start backfilling around MV Line Pit G/MV/02 at Zone-G- As Highlighted
Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 3) above Gravel for Non potabl
Surface Preparation prior to start backfilling around MV Line Pit C/MV/23 at Zone-C- As Highlighted
"Inspection of backfilling Gravel 2nd Layer (2 of 4) for Storm Water Line Manhole MH-M-02, MH-M-03
Inspection of Backfilling Gravel 2nd Layer (2 of 4) around Manhole FW-A-06 - as Highlighted (Stock Pile# 1
Inspection and Compaction test for backfilling Sub-grade 2nd Layer (2 of 3) above Sand Covering for N
Inspection of Concrete Pouring for the Wall of SBC-07 - Wing Wall - As Highlighted
Inspection of Formwork for the Wall of SBC-07 - Wing Wall - As Highlighted
Inspection of Concrete Pouring for Slab of MV Line Pulling Pit - H/MV/11 at Zone-H (As Highlighted)
Inspection of Formwork for Slab of MV Line Pulling Pit - H/MV/11 at Zone-H (As Highlighted)
Inspection of Concrete Pouring for Side Walls of MV Line Pulling Pit - H/MV/19 at Zone-H (As Highlighted
Inspection of Formwork for Side Walls of MV Line Pulling Pit - H/MV/19 at Zone-H (As Highlighted)
Inspection and Compaction Test for Backfilling Sub-grade 1st Layer (1 of 3) above Sand Covering for No
Surface Preparation prior to start Backfilling for Energy Center 2 (as highlighted) Zone 5A Axis 12-13, A
Level and Location for Excavation of mechanical Piping to soak away at Cenozoic Garden (as highlighted
Antitermite for ETFE PUMP ROOM for Mass Concrete under SOG at Zone 2E axis 02Q (as highlighted)
Shuttering for ETFE PUMP ROOM for Mass Concrete under SOG at Zone 2E axis 02Q (as highlighted) (K
Level and Location for ETFE PUMP ROOM for Mass Concrete under SOG at Zone 2E axis 02Q (as highlig
Shuttering for (1 mid) Infill wall between Axis 01P-01Q (as highlighted) Zone 1F
Concreting for (1 mid) Infill wall between Axis 01P-01Q (as highlighted) Zone 1F
Inspection and compaction test 6th layer for Backfilling Around MCPE 4 Axis 01AP ZONE 1P (as highlight
"Surface Preparation Prior to start Backfilling at Cretaceous Garden zone 2D,2E (as highlighted) "
Shuttering for Retaining wall Blinding under foundation in Zone 5 at axis 01C - 01E (as highlighted)
Level and Location for (1 mid) Infill wall between Axis 01P-01Q (as highlighted) Zone 1F
Level and location for Excavation of Retaining wall (under Blinding and foundation) in Zone 5 at axis 01C
Level and Location for Retaining wall Blinding under foundation in Zone 5 at axis 01C - 01E (as highlight
Steel reinforcements for Large Mosque Lower 1st floor suspended slab and Beams at Axis 5-6, C-F (as h
Shuttering for Large Mosque Lower 1st floor suspended slab and Beams at Axis 5-6, C-F (as highlighted)
Concreting for Large Mosque Lower 1st floor suspended slab and Beams at Axis 5-6, C-F (as highlighted
Level and Location for Tunnel 1 wall and suspended Slab part-C (as Highlighted) Zone 2H 869.35
Level and Location for Large Mosque Lower 1st floor suspended slab and Beams at Axis 5-6, C-F (as hig
Inspection and compaction test 2nd layer sub grade ( out of 2 layers Subgrade ) above Sub Surface P
Surface Preparation and Paint touchup for the metal cladding in crescent 01 , Zone-02 1H from Axis
Surface Preparation and Paint touchup Inspection in Crescent 01 , Zone 2 - 1H Axis 01W to 01AA ( As
Final Inspection for the Ivory Garden from Grid lines 01 to 23
Level and Location for Suspended slab at Duct tunner for MCPE 3 at Zone 2E 2F, Axis 03A (as highlighte
Single layer of 4mm thick modified bituminous waterproofing membrane for Infill wall and top of Strip
Shuttering for Tunnel 1 wall and suspended Slab part-C (as Highlighted) Zone 2H 869.35
Concreting for Tunnel 1 wall and suspended Slab part-C (as Highlighted) Zone 2H 869.35
Steel Reinfocements for Retaining wall (wall) Between Axis 02O-02N (as highlighted) Zone 6 & 7
Level and Location for ETFE PUMP ROOM for blinding under SOG axis 02L zone 2D (as highlighted) a
Level and Location for Devonian Garden Foundation (as highlighted) axis 02AL to 02AN (1st part)
Concreting For Infill Wall Inner at Cresecent at Axis 02U &02v (As Highlighted )
Inspection and compaction test 6th layer for Backfilling inside Cafeteria building( Second Part) btween
Inspection and compaction test 1st layer for Backfilling at cafeteria raft area axis 02-2 , 02-1 Zone 2A
Single layer of 4mm thick modified bituminous waterproofing membrane for BOV-62, W20 up to level
Concreting for Internal Building Columns and Wall at Zone 2R C56, C 57, C70, C71, W16 (as highlighted)
Concreting for internal buliding foundation for stair between axis (02-BB & 02-BA) (as highlighted) Zone
Surface Preparation and Solvent Base Primer for Infill wall and top of Strip footing between PC 197-199
Concreting for Large Mosque Lower 1st floor suspended slab and Beams at Axis 1-3, C-F (as highlighted
Level and Location for Foundation of strip footing between PC 23 & PC 25 zone 1D at CRESCENT AXIS 0
Inspection and compaction test 5th layer for Backfilling at Inside cafeteria axis 02-D to 0 2-C , 02/2 Zo
Inspection and compaction test 1st & 2nd layer for Backfilling for Isolated footing of Internal buildin
Surface Preparation and Solvent Base Primer under Foundation of Retaining wall from axis 02E-02I (as H
Shuttering for Suspended slab at Duct tunner for MCPE 3 at Zone 2E 2F, Axis 03A (as highlighted) TOC 8
Installation of UPVC conduit (dia.75mm) Low Current Ductbank (TELECOM) in between handhole ( MH/
Cementitious Waterproofing under Foundation of Retaining wall from axis 02E-02I (as Highlighted) Zone
Protection layer of 4mm thick bituminous protection board under Foundation of Retaining wall from axi
Installation of straight UPVC Conduit (Dia.25mm) and Box for Security (Door Release & Door Breakgla
Concreting for inner Infill wall Beam at axis 02AQ - 02AR Zone 2N (as highlighted)
Inspection and compaction test 5th layer continuation backfilling for Internal Building (2nd part) for Zo
Inspection and compaction test 4th layer for Backfilling at Internal Building at zone 2R (as highlighted)
Protection layer of Geotex and 50mm Screed of DEVONIAN GARDEN at AXIS 02-AO TO 03-S level 870.33
Single layer of 4mm thick modified bituminous waterproofing membrane for foundation of DEVONIAN G
Surface preparation & Solvent Base primer coating for foundation of DEVONIAN GARDEN at AXIS 02-AO
Inspection and compaction test 1st layer for Backfilling at MCPE2 inner axis 02AD-02AH (as highlighted)
Level and Location for inner Infill wall Beam at axis 02AQ - 02AR Zone 2N (as highlighted)
Antitermite for ETFE PUMP ROOM for blinding under SOG axis 02L zone 2D (as highlighted) at CRESC
Concreting for internal building (walls & coumns, C25, C36, C37 C49, C50, W3, W14, W15) of NORTH
Concreting for Buttress Head at BOI, BOV, BII, BIV 57, 58 (as highlighted) at Zone 1P (KAIG3-SCR-CO-S-1
Steel Reinforcements for Diaphragm Wall axis 02AQ (2nd part) from 874.05 to 877.50 (as highlighted)
Protection layer of 4mm thick bituminous protection board for Tunnel 2 shaft Zone 2F from 865.50 up t
Two layer of 4mm thick modified bituminous waterproofing membrane for Tunnel 2 shaft Zone 2F from
Shuttering for Retaining wall (wall) Between Axis 02O-02N (as highlighted) Zone 6 & 7
Level and Location for Retaining wall (wall) Between Axis 02O-02N (as highlighted) Zone 6 & 7
Concreting for Retaining wall (wall) Between Axis 02O-02N (as highlighted) Zone 6 & 7
Protection layer of 4mm thick bituminous protection board for ETFE pump room 6141 under SOG at Zone
Single layer of 4mm thick modified bituminous waterproofing membrane for ETFE pump room 6141 unde
Protection layer of 4mm thick bituminous protection board for RC Strip footing between PC 21-23 at Zo
Surface preparation & Base primer coating for Tunnel 2 shaft Zone 2F From level 865.5 TO 867.00 (as
Coordinates & Levels for Blinding under Gabions, (Between F.O.H and Plant Room) Inside Aviary Garde
Coordinates & Levels for Blinding under Gabions, (Between B.O.H and Plant Room) Inside Aviary Garde
Surface Preparation Prior to Backfilling along Foundation of Boundary wall (Inner Face) (At Bottom of
Inspection & Compaction tests of 1st Layer (Sub-Grade) Backfilling (Out of 5 layers) along Foundation
Aluminium Flashing & Sealant for Water Proofing on Column's & Footing's (27 no's) (All sides) @ Jetty
Aluminium Flashing & Sealant for Water Proofing on Column's & Footing's (18 no's) (All sides) @ Jetty
Surface Preparation prior to Waterpoofing for Beams and Column Necks under Beams (All Sides) of Jet
Cementitious Waterpoofing for Beams and Column Necks under Beams (All Sides) of Jetty 2 at Boat G
Cementitious Waterpoofing for Beams and Column Necks under Beams (All Sides) of Jetty 1 at Boat G
Coordinates & Levels for Blinding ( Lean Concrete ) Under Gabions at Butterfly Garden , as Highlighte
Installation of UPVC Conduits (Dia. 110mm) for Voice & Data Ducts (Data Cables) in the Promenade &
Installation of UPVC Conduits (Dia. 110mm) for Fire Alarm Ducts (Security Cables) in the Promenade
Single layer of 4mm thick modified bituminous waterproofing membrane for Retaining wall at AXIS 0
Level and Location for Zone 2D ETFE Pump Room SOG at axis 02L (as highlighted) (KAIG3-SCR-CO-S-0193
Steel reinforcements for Infill wall (outer) between Axis 02E-02F (as highlighted) Zone 2B
Shuttering for MCPE 3 Suspended Slab (as highlighted) Axis 03A-2P, Zone 2E 2F TOC 875.85 - 875.974
Concreting for MCPE 3 Suspended Slab (as highlighted) Axis 03A-2P, Zone 2E 2F TOC 875.85 - 875.974
Aluminum Cap Installation between Axis 02/AP - 02/AQ.
Aluminum Cap Installation between Axis 02/AQ - 02/AR.
Level and Location for MCPE 3 Suspended Slab (as highlighted) Axis 03A-2P, Zone 2E 2F TOC 875.85 - 87
Installation of Main Potable Water Pipes (200mmØ-UPVC-Class-5) at Zone B- From Pit (B/PW/10) to P
Aluminum Cap Installation between Axis 02/AR - 02/AS.
Aluminum Cap Installation between Axis 02/AS - 02/AT.
Installation of Main Fire Water Pipes (250mmØ-UPVC-Class-5) From PIT(B/F/02) to Point (64757.651
Pipe Installation of cast iron drainage pipe,ground floor At Crescent 2 zone 2N; (cast iron dia 110
Pipe Sleeves Installation of Inner infill Walls Mechanical (SW,FW,PW,NON PW) From Axis 02/AY to 0
Installed Base Extrusion and Base Seal between Axis 02/AK - 02/AJ.
Installation of Rock and Boulder in Wadi-03 (Right Side) - 6th layer (6 of 7)
"Inspection of backfilling Gravel 1st Layer (1 of 4) for Storm Water Line Manhole MH-M-02, MH-M-03,
Inspection of Backfilling Gravel 1st Layer (1 of 4) around Manhole FW-A-06 - as Highlighted (Stock Pile#
"Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 9) for Storm Water Line fro
Inspection and Compaction test for backfilling Sub-grade 4th Layer (4 of 5) for Non-Potable water line
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 3) above Gravel for Non potab
Inspection of Thrust Block for UPVC Pipe (200 & 160 mm Dia) for Fire Water Line at Zone- B - As High
"Inspection of Thrust Block for Potable Water Line ( Dia 80mm) at Zone-B - As Highlighted (SCR-KAIG
Excavation for Fire Water Line at Zone-H - as highlighted
Excavation for Potable Water Line at Zone-H - as highlighted
Surface Preparation prior to start backfilling for Duct Bank of Fire & Security line from C/FS/10 to C/FS/
Concrete Pouring & Shuttering for Footings & Grade Beams @ Grid (K/4-13), at Energy Center 2, as hi
Surface Preparation prior to start backfilling for Duct Bank of Telecommunications line from B/TL11 to
Concrete Pouring & Shuttering for Footing of Boundary Wall @ Grid (17-18/M), at Energy Center 2, as
"Inspection of Concrete Pouring for Wall of MV Line Pulling Pit - L/MV/01 at Zone- L (As Highlighted) "
"Inspection of Formwork for Wall of MV Line Pulling Pit - L/MV/01 at Zone- L (As Highlighted) "
Steel Reinforcement for Footing of Boundary Wall @ Grid (17-18/M), at Energy Center 2, as highlight
Steel Reinforcement for Dome of New Ticketing Booth # 2A, As per Attached Highlighted Drawing's.
Inspection of Concrete Pouring for Slab of MV Line Pulling Pit - L/MV/05 and L/MV/16 at Zone- L (As Hig
Inspection of Formwork for Slab of MV Line Pulling Pit - L/MV/05 and L/MV/16 at Zone- L (As Highlighted
Inspection and Compaction test for backfilling Sub-grade 3rd layer (3 of 4) above gravel For Man
Steel Reinforcements for MCPE 3 Suspanded Slab (as highlighted) Axis 03A-2P, Zone 2E 2F
Steel Reinforcements for inner Infill wall Beam at axis 02AQ - 02AR Zone 2N (as highlighted)
Steel reinforcements for Energy Center (20) Column (ext) at Axis 28-30, M to N, (as highlighted) TOC 87
Steel reinforcements for Energy Center Grade Beam and Foundation (inner) at axis K, 4-13 (as highlighte
Level and Location for Energy Center Grade Beam and Foundation (inner) at axis K, 4-13 (as highlighted)
Level and Location for MCPE 2 - Tunnel, Suspended Slab (as highlighted) Axis 03I-1, TOC varies as attac
Shuttering for Internal Building Columns and Wall at Zone 2R C56, C 57, C70, C71, W16 (as highlighted)
Shuttering for MCPE 2 - Tunnel, Suspended Slab (as highlighted) Axis 03I-1, TOC varies as attached in t
Level and Location for Internal Building Columns and Wall at Zone 2R C56, C 57, C70, C71, W16 (as high
Concreting for Devonian Garden Foundation (as highlighted) axis 02AL to 02AN (1st part)
Concreting for Devonian Garden Foundation (as highlighted) axis 02AL to 02AN (2nd part) zone 2M
Inspection Of Pipe Installation For Irrigation ROW mainline Including Branches; (200mmØ- UPVC-Claa
Inspection Of Pipe Installation For Non-Potable Water (Irrigation Main Line); (200 mmØ- UPVC-Claas-
Inspection Of Pipe Installation For Irrigation ROW Sub-mainline Including Branches; (90,63mmØ- UPV
Inspection Of Pipe Installation For Irrigation ROW Sub-mainline Including Branches; (90,63&50mmØ-
Installation of Straight PVC Conduit (Dia. 25mm) and Boxes for Fire Alarm (Speaker) in the Promenad
Installation of Straight PVC Conduit (Dia. 25mm) and Box for Security (CAM) in the Promenade & Cano
Installation of Straight PVC Conduit (Dia. 25mm) and Box for Voice Data (WIFI, CAM) in the Promenad
Inspection of Sand Covering to protect the pipe for Non-Potable Water Line at Zone-B - as highlighted (
Excavation for Tree Pits (05 no's) Between Seat walls & Tunnel, inside Butterfly Garden, as highlighte
Marking & Check for coordinates of Tree Pits (05 no's) Between Seat walls & Tunnel, inside Butterfly
Excavation for Tree Pits (04 no's) Between Seat walls & Tunnel, inside Butterfly Garden, as highlighte
Marking & Check for coordinates of Tree Pits (04 no's) Between Seat walls & Tunnel, inside Butterfly
Excavation for Tree Pits (08 no's) Along Boundary Wall (Inner side), inside Butterfly Garden, as highli
Marking & Check for coordinates of Tree Pits (08 no's) Along Boundary Wall (Inner side), inside Butter
Stone Cladding for Wall & Column of Boundary wall (Inner Sides) @ span 12 at Water Garden, as high
Inspection & Compaction Tests of 7th Layer Backfilling Subgrade (Out of 10 Layers) for SBC-08 (Behind
Warning Tape & Tiles on for Electrical Lines of Low Voltage (MH/WG/LV/44 to 47) and Emergency lin
Warning Tape & Tiles on Low Current Lines of Fire Alarm & Security lines (MH/WG/FA/26 to 31), insid
Concrete Pouring & Shuttering for Slab of New Ticketing Booth # 3A As per Attached Highlighted Draw
Concrete Pouring & Shuttering for Footing of Boundary Wall at Span 47 of Water Garden, as highlight
Coordinates & Levels for Footing of Boundary Wall at Span 47 of Water Garden, as highlighted area in
Level and Location for Retaining wall (FOUNDATION) Between Axis 02L-02K (as highlighted) Zone 6
Inspection and compaction test 3rd layer for Backfilling at Internal Building at zone 2R (as highlighted)
Level and Location for TIP frist floor slab Axis 02BC , 02-1 TO 02-2 (as highlighted) Zone 2R
Shuttering for TIP frist floor slab Axis 02BC , 02-1 TO 02-2 (as highlighted) Zone 2R
Steel reinforcements for TIP frist floor slab Axis 02BC , 02-1 TO 02-2 (as highlighted) Zone 2R
Surface Preparation Prior to start Backfilling for Isolated footing of Internal building at AXIS 02 BA - 02
Inspection & Compaction Tests of Single Layer Sub Garde Backfilling Surround the Manholes (8 no's:
Stack Boulder Wall for Planting Bed Installed 2 Layers at Discovery GArden along Boundary Walll , At
Inspection & Compaction Tests of Single Layer Backfilling (Sub-Base) for Electrical Lines of Low V
Surface Preparation and Chipping Prior to Internal Plastering at Site Tower 2, as per the attached Dra
Surface Preparation Prior to Backfilling along Foundation of Boundary wall (Inner Face) (At Bottom of
"Inspection and Compaction Test for backfilling Sub-grade 4th Layer (4 of 4) for Footing and Column Nec
"Inspection and Compaction Test for backfilling Sub-grade 4th Layer (4 of 4) for Footing and Column Nec
Inspection of Grouting (Horizontal & Vertical Joints) for Rock Boulder - WRB-055 for All Layers
Inspection of Grouting (Horizontal & Vertical Joints) for Rock Boulder - WRB-054 for All Layers
Inspection and Compaction test for backfilling Sub-grade 3rd Layer (3 of 3) above Sand Covering for RO
"Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 9) for Storm Water Line fr
"Inspection and Compaction test for backfilling Sub-grade 3rd Layer (3 of 3) above Sand Covering for Non
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 3) above Sand Covering for No
Inspection of Steel Reinforcement for Slab of MV Line Pulling Pit - H/MV/11 at Zone-H (As Highlighted)
Surface Preparation Prior to Start Backfill Gravel for Storm Water Line Manhole MH-M-02, MH-M-03,
Surface Preparation Prior to Start Backfilling Gravel around Manhole FW-A-06 - as Highlighted
Inspection of Water Proofing for Duct Bank of Fire & Security line from C/FS/10 to C/FS/47 at Zone-C - A
Inspection of Water Proofing for Duct Bank of Telecommunications line from B/TL11 to C/TL/51 at Zone-
Surface Preparation prior to start Water Proofing for Duct Bank of Telecommunications line from B/TL1
Inspection of Sand bediing under pipe for Heating and Chilled Water Line at Zone-G - As highlighted (Sto
Inspection of Sand bedding under pipe for MV Line from L/MV/14 to L/MV/06 at Zone-L - as highlighted
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 3) above Gravel for Non potabl
Excavation for Fire Water Line at Zone-F including Pit F/F/01 - as Highlighted
Steel Reinforcements for Zone 2D ETFE Pump Room SOG at axis 02L (as highlighted) (KAIG3-SCR-CO-S-0
Shuttering for Zone 2D ETFE Pump Room SOG at axis 02L (as highlighted) (KAIG3-SCR-CO-S-0193-00)
Concreting for Zone 2D ETFE Pump Room SOG at axis 02L (as highlighted) (KAIG3-SCR-CO-S-0193-00)
Surface Preparation Prior to start Backfilling for Isolated footing of Internal building of Zone 2C (as h
Level and Location for inner Infill wall Beam at axis 02AC - 02AD Zone 2J (as highlighted) level 873.54
Stiffener (rebars) for ETFE pump room 6146 at zone 2D axis 02J (as highlighted)
Surface Preparation and Solvent Base Primer Coating for RC Strip footing between PC 21-23 at Zone 1D (
Application of anti termite under (2) Blinding for Internal Building at Zone 1A, 1B (as highlighted) Axis
Level and Location of (2) Blinding for Internal Building at Zone 1A, 1B (as highlighted) Axis 01D-01C
Shuttering of (2) Blinding for Internal Building at Zone 1A, 1B (as highlighted) Axis 01D-01C
Level and Location for inner Infill wall Beam at axis 01H - 01I Zone 1C (as highlighted) level 872.00 - 873
Steel reinforcements for Infill wall (inner) between BII 123-124 Axis 02AZ-02AY (as highlighted) Zone 2Q
1st Layer of CHB laying for ETFE Pump Room 6164 at Zone 2D axis 02J (as highlighted) using 20cm CHB
Surface Preparation and Solvent Base Primer for ETFE pump room 6141 under SOG at Zone 2E axis 02J (
Shuttering for inner Infill wall Beam at axis 01H - 01I Zone 1C (as highlighted) level 872.00 - 873.21
Concreting for inner Infill wall Beam at axis 01H - 01I Zone 1C (as highlighted) level 872.00 - 873.21
Concreting for Retaining wall front canopy Corbel Between Axis 01AH-01AO (as highlighted) Zone 1
Concreting for 1st floor walls (W1-B, W1-C) Axis 3-8, F-G at SOUTH SMALL MOSQUE (as highlighted) fro
Concreting for Kicker of Infill wall for Zone 1A between Axis 01A-01B-01C-01D (PC 1-3-5, 2-4-6-8) (as hig
Level and Location for Kicker of outer Infill wall for Zone 1A between Axis 01A-01B-01C (PC 1-3-5) (as hi
Level and Location for 1st floor walls (W1-B, W1-C) Axis 3-8, F-G at SOUTH SMALL MOSQUE (as highligh
Shuttering for 1st floor walls (W1-B, W1-C) Axis 3-8, F-G at SOUTH SMALL MOSQUE (as highlighted) fro
Protection layer of 4mm thick bituminous protection board for North admin building, Column, Wall an
Surface Preparation and Solvent Base Primer Coating for wall at Tunnel 1 part c (as highlighted) from 8
two layers of 4mm thick modified bituminous waterproofing membrane for wall at Tunnel 1 part c (as h
Inspection Of Pipe Installation For Irrigation ROW mainline Including Branches; (200mmØ- UPVC-Claa
Protection layer of 4mm thick bituminous protection board for wall at Tunnel 1 part c (as highlighted)
"Inspection and compaction test for 1st layer under lower EPDM for cretaceous garden zone 2D,2E (
Steel Reinfocements for Retaining wall (FOUNDATION) Between Axis 02L-02K (as highlighted) Zone 6
Shuttering for Retaining wall (FOUNDATION) Between Axis 02L-02K (as highlighted) Zone 6
Concreting for Retaining wall (FOUNDATION) Between Axis 02M-02K (as highlighted) Zone 6
Steel Reinforcements for Internal Building foundation (P1 & P7) at Zone 2R axis 02BA - 02AZ (as highligh
Concreting for MCPE 3 wall at axis 02P (as highlighted) at Zone 2E 2F (KAIG3-SCR-MC-S-191-00)
Application of anti termite under Blinding for strip footing between PC 194-196 zone 2R (as highlighted)
Concreting of Blinding for strip footing between PC 194-196 zone 2R (as highlighted)
Protection layer of 4mm thick bituminous protection board for Stair for Internal Building Foundation
Installation of straight PVC Conduit (Dia. 25mm) and boxes for Lighting System (LED CT, CT/CE, C, C
Shuttering for strip footing between PC 23 & PC 25 zone 1D at CRESCENT AXIS 01-M TO 01-L (as highli
Installation of UPVC Conduit (Dia. 25mm) & Boxes for Lighting System (Lighting Fixture) at New Ticke
Steel Reeinforcements (Starter bar ) for shell beam , Butress head axis 01 AR zone 1P (as highlighted)
Installation of straight PVC Conduit (Dia. 25mm) and boxes for Lighting System (LED 1M, CT, C, CD,
Installation of Straight PVC Conduit (Dia. 25mm) and Boxes for Fire Alarm (Speaker) in the Promenad
Installation of Straight PVC Conduit (Dia. 25mm) and Box for Voice Data (WIFI) in the Promenade & C
Installation of UPVC Conduit (Dia. 25mm) and Boxes for Fire Alarm (Smoke Detector & Voice Alarm) at
Inspection of Excavation for Heating and Chilled Water Line at Zone-G - As highlighted
Sand Cover & Protection for Water Feature Lines (Main 110 & 63 mm dia. HDPE) from Plant room to Ou
Inspection & Compaction Tests of 6th Layer Backfilling Subgrade (Out of 10 Layers) for SBC-08 (Left Sid
Stack Boulders Installed Layer at level +879.28, Between Boat Garden and Wadi (3), Inside Boat Gar
Coordinates & Levels for Blinding ( Lean Concrete ) Under Gabions at Butterfly Garden , as Highlighte
Inspection of Thrust Block for Non-Potable Water (Irrigation Line ); at Maze Garden, as highlighted a
Excavation & Soil Preparation Prior to Boulders Walls Inside Mist Garden , at water Garden, as highli
Inspection of Thrust Block for Non-Potable Water (Irrigation Line ); at Sound & Light Garden, as high
Excavation for Remaining of Tree Pits (25 no's) Along Boundary Wall (Inner side), at Discovery Garden
Marking & Check for coordinates of Remaining of Tree Pits (25 no's) Along Boundary Wall (Inner side)
Installed Base Extrusion and Base Seal between Axis 02/AJ - 02/AI.
Inspection & Compaction Tests of Single Layer (Sub-Grade) Backfilling on Fire Fighting Lines (Pipe di
Installed Base Extrusion and Base Seal between Axis 02/AL - 02/AK.
Inspection & Compaction Tests of 5th Layer Backfilling Sub-Base (Out of 5 Layer) Near SBC-08 Inside
Coordinates and levels of Screed protection of water proofing for Fountain of Geyser Garden ,at Wate
Coordinates and levels of Screed protection of water proofing for Fountain (3) ,at Physic Garden as hi
Concrete Pouring Screed protection of water proofing for Fountain (3) ,at Physic Garden as highlighte
Excavation & Compaction Test Prior to Blinding under Gabions Inside Aviary Garden, at highlighted a
Excavation & Compaction Test Prior to Blinding under Gabions Inside Butterfly Garden, at highlighted
Excavation & Compaction Test Prior to Blinding under Gabions Inside Aviary Garden, at highlighted a
Inspection & Compaction Tests of Single Layer (Sub-Base) Backfilling, at the Entrance of Boat garden,
Inspection & Compaction Tests of 5th Layer Backfilling Subgrade (Out of 10 Layers) for SBC-08 (Left Sid
Steel Reinforcement for Footings & Kicker of Boundary Wall at Span 47 of Water Garden as highlighte
Concrete Pouring Screed protection of water proofing for Fountain of Geyser Garden ,at Water Garde
Warning Tiles & Warning Tape for Electrical Lines of Low Voltage (MH/WG/LV/04 to 16 ) and Emergen
Geo Textile on Blinding of Fountain of Geyser Garden , inside Water Garden, As per Attached Highlig
Protection layer of 4mm thick bituminous protection board (Both sides 500mm wide) on Blinding unde
Geo Textile on Blinding (Both sides 500mm wide) under boundary wall at Span 47, at Water Garden, as
Inspection & Compaction tests after Excavation for ( Sub-Grade ) Layer for Lake of Mist Garden , as Hi
Geo Textile on Blinding of Fountain (3), inside Physic Garden, As per Attached Highlighted Drawing's.
Inspection of Sand Covering to protect the pipe for Non-Potable Water Line at Zone-B - as highlighted (
"Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 9) for Storm Water Line fro
"Inspection and Compaction test for backfilling Sub-grade 2nd Layer (2 of 3) above Sand Covering for N
Inspection and Compaction test for backfilling Sub-grade 2nd Layer (2 of 3) above Sand Covering for RO
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 6) for Non potable water line p
Steel Reeinforcements for strip footing between PC 23 & PC 25 zone 1D at CRESCENT AXIS 01-M TO 01-L
Inspection of Sand bedding under pipe for Heating and Chilled Water Line at Zone-G - As highlighted (St
Inspection and Compaction test for backfilling Sub-grade 6th Layer (6 of 6) around MV Line Pit G/MV/37
Two coat of bituminous damp proofing coating for Stair for Internal Building Foundation ZONE 2R at
Inspection of backfilling Gravel 2nd Layer (2 of 3) for Non potable water line pit POC-43 at Zone K - As H
Inspection and Compaction test for backfilling Sub-grade 3rd Layer (3 of 5) for Non-Potable water line Zo
"Inspection and Compaction test for backfilling Sub-grade 4th Layer (4 of 5) above sand cover for Non-P
Surface preparation & Base primer coating for Stair for Internal Building Foundation ZONE 2R at AXIS
Surface Preparation prior to start backfilling for Non potable water line pit POC-6 at zone B - As Highlig
Surface Preparation and Concrete Repairing for MCPE-2 wall (as highlighted) using approved Materia
Inspection for Blinding Concrete under MV Line Pulling Pit L/MV/16, L/MV/05, L/MV/01 and H/MV/19 - a
Steel Reinforcements for MCPE 1 tunnel wall at axis 03-1 to 03-2, 03U, 03S, 03T (as highlighted) upto 8
Installation of Rock and Boulder in Wadi-03 (Left Side) - 7th layer (7 of 7)
Surface Preparation and Solvent Base Primer Coating for MCPE 1 side of Ground slab and Wall (as highli
Installation of Rock and Boulder in Wadi-03 (Left Side) - 6th layer (6 of 7)
Shuttering for Buttress Head at BOI, BOV, BII, BIV 57, 58 (as highlighted) at Zone 1P (KAIG3-SCR-CO-S-19
Steel reinforcements for Energy Center Internal Column (neck) at Axis 11-12, D-H (as highlighted)
Steel reinforcements for Energy Center Columns (25 nos.) at Axis 18-24, R (as highlighted) level 875.50
Shuttering for ETFE PUMP ROOM for blinding under SOG axis 02L zone 2D (as highlighted) at CRESCE
Concreting for ETFE PUMP ROOM for blinding under SOG axis 02L zone 2D (as highlighted) at CRESCE
Surface Preparation Prior to start Backfilling FOR infill wall around stripfooting and pile cap at zone 1G
Inspection and compaction test 2nd layer for Backfilling at Internal Building at zone 2R (as highlighted)
Inspection and compaction test 5th layer for Backfilling at Internal Building at zone 1N (as highlighted
Inspection and compaction test 5th layer for Backfilling Around MCPE 4 Axis 01AP ZONE 1P (as highlight
Concreting for Internal building (colmns C17, C 19, C 79) of NORTH ADMINSTRATION between axis 02/B
Anti termite application under Strip Footing blinding between PC 5-7 Zone 1A (as highlighted)
Concreting for Strip Footing blinding between PC 5-7 Zone 1A (as highlighted)
Steel Reinforcements for Devonian Garden Foundation (as highlighted) axis 02AL to 02AN (2nd part) zo
Shuttering for Devonian Garden Foundation (as highlighted) axis 02AL to 02AN (2nd part) zone 2M
Level and Location for Devonian Garden Foundation (as highlighted) axis 02AL to 02AN (2nd part) zone
Shuttering for MCPE 3 plinding under ground foundation at axis 02-P, 03-2 to 03-1 , LEVEL 870.35 Zone
Surface preparation & Base primer coating for SOUTH WATCH TOWER level 858.90 (as highlighted) Zon
Protection layer of 4mm thick bituminous protection board for RC foundation and wall 33 at Cafeteria f
Steel Reinforcements for Infill inner wall beams at Crescent between axis (02-O & 02-P) and (02-Q & 0
Level and Location for MCPE 3 plinding under ground foundation at axis 02-P, 03-2 to 03-1 , LEVEL 870.
'Pipe Installation of Strom Water pipe OUT FALL-G for (400mm Ø- UPVC Pipes-Class 4 ) for Storm Wa
'Bedding of Gravel 3/8" and Geotextile surrounding in pipes (400mm Ø- UPVC Pipes-Class 4 ) for Sto
'Warning Tape For Non-Potable Water (Irrigation Main Line); (200 mmØ- UPVC-Claas-5 ) ; As per Hig
Shuttering for Internal Building foundation (P1 & P7) at Zone 2R axis 02BA - 02AZ (as highlighted)
Concreting for Internal Building foundation (P1 & P7) at Zone 2R axis 02BA - 02AZ (as highlighted)
Inspection of Installation, Alignment and Bolt Tightening for the Metal Cladding in Crescent 01 Zone 3
Inspection of Installation, Alignment and Bolt Tightening for the Metal Cladding in Crescent 01 Zone
Surface Preparation and Paint Touch Up Inspection for the Metal Cladding in Crescent 01, Zone-1 1L
Final Inspection for the Crescent 01, Zone 3 - 1G from Axis (01S to 01W)
Final Inspection for the Partition wall in Crescent 02, Zone 3 - 2N from Axis 02AR
Final Inspection for the Crescent 01, Zone 3 - 1F from Axis (01P to 01S)
Surface Preparation and Paint Touch Up Inspection in Crescent 01, Zone 1 - 1J & 1K Axis 01AA to 01AG
Surface Preparation and Paint Touch Up Inspection for the Metal Cladding in Crescent 01, Zone-1 1J
Inspection of Alignment for the Installed Baseplates in Crescent 01 Zone 3, 1E
Surface Preparation and Paint Touch Up Inspection in Crescent 01, Zone-1 1L, 1M & 1N from Axis 01A
Installation of UPVC conduit (4x110mm dia.) Low Current Ductbank (TELECOM) no.(F/D-TL/03, GG/D-TL
Installation of straight UPVC Conduit (Dia. 160mm) Medium Voltage Ductbank from Manhole no. (G/
Inspection and compaction layer for Backfilling under blinding for Devonian Garden zone 2M (as highlig
Inspection and compaction test 7th layer of backfilling inside Cfeteria building (2nd part) between axi
Protection Layer of 4mm Thick Bituminous Protection Board for Retaining Wall & Foundation (Inner)
Installation of PVC Conduit (Dia. 25mm) for Lighting (EXIT Sign) at the Crescent-02 at the Infill Wal
Installation of Straight PVC Conduit (Dia. 25mm) and Boxes for Voice & Data (DATA & Telephone) at
Installation of Straight PVC Conduit (Dia. 25mm) and Boxes for Fire Alarm (Speaker) in the Crescent-0
Installation of UPVC conduit (4x110mm dia.) Low Current Ductbank (Fire and Security) no.(F/D-FS/01
"Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 3) above Sand Covering for No
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 3) above Sand Covering for RO
Inspection of Excavation for MV Line from H/MV/08 to H/MV/31 at Zone-H - as highlighted
Inspection of Excavation for Heating and Chilled Water Line Pit G/DH/19, G/DC/18 at Zone-G - As highli
Inspection of Excavation for Heating and Chilled Water Line at Zone-H&L including branch and Pit H/D
Inspection and Compaction test for backfilling Sub-grade 2nd layer (2 of 4) above gravel For Man
"Inspection and Compaction test for backfilling Sub-grade 2nd layer (2 of 4) above gravel for Stor
inspection and Compaction test for backfilling Sub-grade 4th Layer (4 of 6) around Fire Water Line Pit f
Inspection and Compaction test for backfilling Sub-grade 4th Layer (4 of 7) around MV Line Pit C/MV/
Inspection and Compaction test for backfilling Sub-grade 2nd layer (2 of 2) above gravel around Potable
Inspection and Compaction test for backfilling Sub-grade 4th Layer (4 of 5) for Non potable water line
Inspection and Compaction test for backfilling Sub-grade 5th Layer (5 of 6) around MV Line Pit G/MV/37
Inspection of backfilling Gravel 1st Layer (1 of 3) for Non potable water line pit POC-43 at Zone K - As Hi
Inspection and Compaction test for backfilling Sub-grade 2nd Layer (2 of 5) for Non-Potable water line
"Inspection and Compaction test for backfilling Sub-grade 3rd Layer (3 of 5) above sand cover for Non-P
Installation of Rock and Boulder No. WRB-54 - 4th layer (4 of 4)
Installation of Rock and Boulder No. WRB-54 - 3rd layer (3 of 4)
"Inspection for Installation of MV Line Junction Pit - C/MV/20 and C/MV/13 - as highlighted "
Inspection and Compaction test for backfilling Sub-grade 3rd Layer (3 of 5) for Non potable water lin
Inspection of Steel Reinforcement for slab of MV Line Pulling Pit - L/MV/05 and L/MV/16 at Zone-L (As
Inspection and Compaction test for backfilling Sub-grade 4th Layer (4 of 4) for Fire&Security Line Pit
Inspection and Compaction test for backfilling Sub-grade 4th Layer (4 of 4) for Telecommunication Line
"Inspection and Compaction test for backfilling Sub-grade 6th Layer (6 of 6) for Non-Potable water line
Surface Preparation prior to start backfilling for Non potable water line pit POC-43 at zone K - As Highli
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 5) for Non-Potable water line Z
"Inspection and Compaction test for backfilling Sub-grade 2nd Layer (2 of 5) above sand cover for Non-P
Inspection of Steel Reinforcement for footing and wall of MV Line Pulling Pit - L/MV/01, L/MV/05, L/
Inspection of Concrete Pouring for Side Walls of MV Line Pulling Pit - L/MV/16 and L/MV/05 at Zone-L (
Inspection of Formwork for Side Walls of MV Line Pulling Pit - L/MV/16 and L/MV/05 at Zone-L (As Highl
Inspection and Compaction test for backfilling Sub-grade 2nd Layer (2 of 5) for Non potable water lin
Inspectionand Compaction test for backfilling Sub-grade 1st Layer (1 of 1) above Sand Covering for RO
Inspection od Sand bedding under pipe for Fire Water Line at Zone-B - as highlighted (Stock Pile# 132)
Inspection of Sand bedding under pipe for Potable Water Line at Zone-B - as highlighted (Stock Pile# 132
Inspection of Blinding Concrete under Heating & Chilled Water Line Isolation Pit for B/DC/02, B/DC/06,
"Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 4) for Footing and Column Nec
"Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 4) for Footing and Column Nec
Installation of Rock and Boulder in Wadi-03 (Left Side) - 5th layer (5 of 7)
"Inspection of Grouting (Horizontal & Vertical Joints) for Rock Boulder - RB-073 for All Layers"
"Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 1) above sand cover for Non-P
Level and Location for Internal Building foundation (P1 & P7) at Zone 2R axis 02BA - 02AZ (as highlighted
Protection layer of 4mm thick bituminous protection board for for Zone 2R internal building Columns,
Inspection for Installation of Non-Potable Water Line Pit - POC-18, POC-19 and POC-43 - as highlighted
Shuttering for (1) Infill wall between Axis 01P-01Q (as highlighted) Zone 1F
Excavation for Fire Water Line at Zone-B - as highlighted
Concreting for (1) Infill wall between Axis 01P-01Q (as highlighted) Zone 1F
Excavation for Potable Water Line at Zone-B - as highlighted
Inspection for Installation of Heating and Chilled wahter Line Pit G-DC-13, B-DC-02 and B-DC-06 as highl
Level and Location for (1) Infill wall between Axis 01P-01Q (as highlighted) Zone 1F
Inspection and Compaction test for backfilling Sub-grade 3rd Layer (3 of 7) around MV Line Pit C/MV/
Steel reinforcements for inner Infill wall Beam at axis 02AC - 02AD Zone 2J (as highlighted) level 872.89
inspection and Compaction test for backfilling Sub-grade 3rd Layer (3 of 6) around Fire Water Line Pit f
Shuttering for inner Infill wall Beam at axis 02AC - 02AD Zone 2J (as highlighted) level 872.89
Concreting for inner Infill wall Beam at axis 02AC - 02AD Zone 2J (as highlighted) level 872.89
Steel Reinforcements for MCPE 2 Suspanded Slab (as highlighted) Axis 031-I, TOC varies as attached in
Steel Reinforcements for inner Infill wall Beam at axis 01H - 01I Zone 1C (as highlighted) level 872.00 -
Level, Location for wall for Retaining Wall blinding Under Foundation axis from before 02I to after 02J
Concreting for Retaining Wall blinding Under Foundation axis from before 02I to after 02J for Zone 6 &
Inspection and Compaction test for backfilling Sub-grade 1st layer (1 of 1) above Sand Covering for Fi
Inspection and Compaction test for backfilling Sub-grade 1st layer (1 of 1) above Sand Covering for
Shuttering for MCPE 3 wall at axis 02P (as highlighted) at Zone 2E 2F (KAIG3-SCR-MC-S-191-00)
Inspection and Compaction test for backfilling Sub-grade 1st layer (1 of 1) above Sand Covering for RO
Inspection and Compaction test for backfilling Sub-grade 1st layer (1 of 4) above gravel For Man
Level and Location for MCPE 3 wall at axis 02P (as highlighted) at Zone 2E 2F (KAIG3-SCR-MC-S-191-00)
Inspection and Compaction test for backfilling Sub-grade 2nd layer (2 of 2) above Sand Covering for RO
Inspection and Compaction test for backfilling Sub-grade 1st layer (1 of 4) above gravel for Storm
Inspection and Compaction test for backfilling Sub-grade 1st layer (1 of 2) above gravel around Potable
Inspection of Concrete (Plain) Pouring for the Duct Bank of MV Line from C/MV/03 to C/MV/30 at Zone-
Shuttering for Retaining Wall blinding Under Foundation axis from before 02I to after 02J for Zone 6 &
Inspection of Concrete (Plain) Pouring for Duct Bank of Fire & Security line from C/FS/09 to C/FS/08 at
Inspection of Concrete (Plain) Pouring for Duct Bank of Telecommunications line from C/TL/12 to C/TL/1
Inspection and Compaction test for backfilling Sub-grade 3rd Layer (3 of 4) for Fire&Security Line Pit
Level and Location for Excavation for Retaining Wall at CRESCENT Zone 6 and 7 from axis before 02I to af
Inspection and Compaction test for backfilling Sub-grade 3rd Layer (3 of 4) for Telecommunication Line
"Inspection and Compaction test for backfilling Sub-grade 5th Layer (5 of 6) for Non-Potable water line
Inspection and Compaction test for backfilling Sub-grade 4th Layer (4 of 6) around MV Line Pit G/MV/3
Steel Reinforcements for Internal Building Columns and Wall at Zone 2R C56, C 57, C70, C71, W16 (as h
Inspection of Excavation for MV Line from L/MV/14 to L/MV/06 at Zone-L - as highlighted
Steel Reinforcements for Energy Center 2, Wall (W4) at Axis 0-1, I-C (as highlighted) level 877.00
Inspection and Compaction test for backfilling Sub-grade 2nd Layer (2 of 4) for Fire&Security Line Pit
Inspection and compaction test 4th layer for Backfilling Around MCPE 4 Axis 01AP ZONE 1P (as highlight
Inspection and Compaction test for backfilling Sub-grade 2nd Layer (2 of 4) for Telecommunication Line
"Inspection and Compaction test for backfilling Sub-grade 4th Layer (4 of 6) for Non-Potable water line
Inspection and Compaction test for backfilling Sub-grade 3rd Layer (3 of 6) around MV Line Pit G/MV/3
Inspection and compaction test 4th layer for Backfilling at Internal Building at zone 1N (as highlighted
Shuttering for internal buliding foundation for stair between axis (02-BB & 02-BA) (as highlighted) Zone
Level and Location for internal buliding foundation for stair between axis (02-BB & 02-BA) (as highlight
Inspection and compaction test 1st layer for Backfilling at Internal Building at zone 2R (as highlighted)
Shuttering for Central Bridge Abutment Wall (as highlighted) Zone 4 Grid 02AK level 864.60 to 869.70
Concreting for Central Bridge Abutment Wall (as highlighted) Zone 4 Grid 02AK level 864.60 to 869.70
Level and Location for Central Bridge Abutment Wall (as highlighted) Zone 4 Grid 02AK level 864.60 to
Steel Reinforcements for Infill wall inner at Crescent between axis (02-AG & 02-AH) (As highlighted) Z
Protection layer of 4mm thick bituminous protection board for infill wall BOI 126-125 and top strip foo
Surface preparation & Base primer coating for infill wall BUTTRESS , top side pile cap and clomns, BOI
Single layer of 4mm thick modified bituminous waterproofing membrane for infill wall BOI 126-125 and
Single layer of 4mm thick modified bituminous waterproofing membrane for infill wall BUTTRESS , top s
Level and location for STAIR at Large Mosque, Axis E-F, 1-1.1 zone 1G (as highlighted)
Shuttering for STAIR at Large Mosque, Axis E-F, 1-1.1 zone 1G (as highlighted)
Steel Reinforcements for STAIR at Large Mosque, Axis E-F, 1-1.1 zone 1G (as highlighted)
Surface Preparation and Solvent Base Primer for Infill wall between BIV 25, BII 25, BIV 26, BII 26, (B
Single layer of 4mm thick modified bituminous waterproofing membrane for for Infill wall between BIV
Level and location for inner Infill wall at zone 1C axis 01I to 01J (BII 11-12) (AS HIGHLIGHTED) (2nd Stage
Surface Preparation Prior to start Backfilling at Internal Building at zone 2R (as highlighted) Axis 02-BB
Inspection and compaction test 4th and 5th layer at MCPE 1 Axis 02AM, 03-1 to 03-3 (as highlighted) (
Level and Loucation for Infill wall inner at Crescent at axis 02U & 02V (As highlighted) ZONE 2F
Level and Location for excavation Under strip Footing between PC 194-196 (as highlighted) Zone 2R
Level and Location for Large mosque Lower 1st floor suspended slab and Beams at Axis 1-3 , C-F(As h
Single layer of 4mm thick modified bituminous waterproofing membrane for Buttress BIV BII 25-26, B
Protection layer of 4mm thick bituminous protection board for for Infill wall between BIV 25, BII 25,
Surface Preparation and Solvent Base Primer for Buttress BIV BII 25-26, BIV 27-28 FACING MOSQUE (as
Shuttering for Infill wall inner at Crescent at axis 02U & 02V (As highlighted) ZONE 2F
Protection layer of 4mm thick bituminous protection board for Buttress BIV BII 25-26, BIV 27-28 FACI
Two layers of 4mm thick modified bituminous waterproofing membrane for MCPE 2 wall and counterfort
Surface preparation & Solvent Base primer coating for MCPE 2 wall and counterfort ( inner ) between
Grouting of Installed Anchor bolt and under Baseplate at Zone 2F OUTER ring beam (as highlighted)
Aluminium Flashing ( 2.0mm THICK & 50mm TOTAL GIRTH ) and Protection Sealant for retaining wall inne
Protection layer of 4mm thick bituminous protection board for walls W33, W34, W35 outer curve from
Two coat of bituminous damp proofing coating for walls W33, W34, W35 outer curve from level 856.0
Surface preparation & Base primer coating for walls W33, W34, W35 outer curve from level 856.00 u
Level and Location for Excavation of Devonian Garden (as highlighted) Zone 2M
Level and Location for outer wall with counter fort at Axis 02S-02T (as highlighted) Zone 2F
Level and Location for Energy Center Beams at Grid 0-14-I, 7 to 11-A (as highlighted) 875.35
Level and Location for Diaphragm Wall axis 02AQ (1st stage toc 874.00) (2nd part) (as highlighted) Zone
Protection layer of 4mm thick bituminous protection board for ETFE pump room ZONE 2D at AXIS 2L up
Installation of EMT Conduit (Dia. 3/4, 1 inch.) and Box (Ceiling Mounted) for Lighting (E1, E1/CE,
"Inspection for Installation of Heating and Chilled wahter Line Pit G-DH-21, G-DC-20, G-DC-22, G-DC-
Installation of EMT Conduit (Dia. 3/4) and Box for Voice and Data (CAM,WIFI) at Management and Mai
Inspection for Casting the Concrete encasement for mv line form G/MV/21 to G/MV/37 As highlighted
Surface Preparation prior to start backfilling around MV Line Pit C/MV/15, C/MV/12, C/MV/21 and H/
Protection layer of 4mm thick bituminous protection board for Butress , Top pilcap & Coloumns up S.O
Single layer of 4mm thick modified bituminous waterproofing membrane for Butress , Top pilcap & Col
Surface preparation & Base primer coating for infill wall BOI 126-125 and top strip footing inner side
Protection layer of 4mm thick bituminous protection board for infill wall BUTTRESS , top side pile cap
1st Layer of CHB laying for Pump Room at Zone 1C axis 01I (as highlighted) using 20cm CHB
Concreting for inner Infill wall at zone 1C axis 01I to 01J (BII 11-12) (AS HIGHLIGHTED) (2nd Stage)
Shuttering for inner Infill wall at zone 1C axis 01I to 01J (BII 11-12) (AS HIGHLIGHTED) (2nd Stage)
Shuttering for outer wall with counter fort at Axis 02S-02T (as highlighted) Zone 2F
Shuttering and Concreting for Energy Center Internal Foundation and Grade Beam at Axis 4-5, C (as high
Shuttering and Concreting for Energy Center Beams at Grid 0-14-I, 7 to 11-A (as highlighted) 875.35
Steel Reinforcements for MCPE 2 wall & Counter fort at axis 03E-02Z (as highlighted) at Zone 2G, 2H, 2
Surface Preparation and Base Primer Coating for Energy Center Side of Footing (inner foundation) (as hi
Grouting of Installed Anchor bolt and under Baseplate at Zone 1E OUTER ring beam (as highlighted)
Protection layer of 4mm thick bituminous protection board for Infill wall between BOI 126_127 BII 128
Single layer of 4mm thick modified bituminous waterproofing membrane for Infill wall between BOI 12
Surface preparation & Base primer coating for ETFE pump room ZONE 2D at AXIS 2L up to level 869.20
Single layer 4mm thk Modified Bituminous Water Proofing Membrane on Blinding of Fountain of Geys
Single layer of 4mm thick modified bituminous waterproofing membrane for ETFE pump room ZONE 2D at
Single layer 4mm thk Modified Bituminous Water Proofing Membrane on Blinding of Fountain (3),Insi
Steel Reinforcements for internal buliding foundation for stair between axis (02-BB & 02-BA) (as highli
Surface Preparation Prior to Backfilling, Between Geyser Garden & Aviary Garden & Boat Garden ), a
Mechanical Pipe Sleeves Installation for First floor At Large Mosque (Crescent 1); (UPVC Pipe Cla
2nd Coat Cementitious Water Proofing for Blinding under boundary wall at Span 47, at Water Garden,
Single layer 4mm thick modified bituminous waterproofing membrane (Both sides 500mm wide) on Blin
Inspection & Compaction Tests of 4th Layer Backfilling Subgrade (Out of 5 Layer) Near SBC-08 Inside
Inspection & Compaction Tests of Backfilling (Sub Grade) for Support to Sand Cover of Low Current Li
Excavation for Planter Boxs, between boulders at Water Play Garden Inside Water Garden, at highligh
Excavation for Planter Boxs, between boulders at Mist Garden Inside Water Garden, at highlighted ar
Installation of Steel Structures of All Canopy for Ticket Booth - QTY = 16 at Zoon 3B
Sand Cover & Protection for Electrical Lines of Low Voltage (MH/WG/LV/04 to 16 ) and Emergency li
Excavation for Planter Boxs, between boulders at Mist Garden Inside Water Garden, at highlighted ar
Solvent Base Primer Coating (Both sides 500mm wide) for Blinding prior to Water proofing under boun
Inspection & Compaction Tests of 3rd Layer Backfilling Subgrade (Out of 10 Layers) for SBC-08 (Left Sid
Check Top of Slab Levels (+2950) for New Ticketing Booth # 3A As per Attached Highlighted Drawing's
Installation of straight PVC Conduit (Dia. 32mm) & Boxes for Power System (Cleaner Socket & Fused Co
Installation of UPVC Conduit (Dia. 25mm) & Boxes for Lighting System (Lighting Fixture) at New Ticke
Installation of straight PVC Conduit (Dia.25mm) and Box for Fire Alarm (Break Glass) at the Public Toi
Installation of straight PVC Conduit (Dia.25mm) and Box for Voice and Data (Telephone) at the Public
Installation of UPVC Conduit (Dia. 25mm) and Boxes for Fire Alarm (Smoke Detector & Voice Alarm) at
Installation of UPVC Sleeves for Low Current (ICT) Ducts (Dia. 110mm) at the Infill Wall in the Pro
Installation of straight UPVC Conduit (Dia.25mm) and Box for Voice and Data (Data, TV & Telephone)
Inspection & Compaction Tests of 3rd Layer Backfilling Subgrade (Out of 5 Layer) Near SBC-08 Inside
Surface preparation of Blinding prior to Water proofing under boundary wall at Span 47, at Water Gar
Concrete Pouring for Fountain 1, At Inner Side of Plant room, Inside Physic Garden, as highlighted in
Coordinates & Levels for Fountain 1, At Inner Side of Plant room, Inside Physic Garden, as highlighted
Sand Cover & Protection for Low Current Lines of Fire Alarm & Security lines (MH/WG/FA/26 to 31), i
Sand Cover & Protection for Electrical Lines of Low Voltage (MH/WG/LV/44 to 47) and Emergency li
Excavation for Planter Boxs, between boulders at Mist Garden Inside Water Garden, at highlighted ar
Excavation for Planter Boxs, between boulders at Mist Garden Inside Water Garden, at highlighted ar
1st Coat Cementitious Water Proofing for Blinding under boundary wall at Span 47 , at Water Garden,
Inspection & Compaction Tests of 2nd Layer Backfilling Subgrade (Out of 10 Layers) for SBC-08 (Left Sid
Sand Bedding for Low Current Lines (MH/PG/LC/06-17) and Fire Alarm & Security lines (MH/PG/FA/03-1
Concrete Pouring for Blinding under Fountain 1, At Inner Side of Plant room, Inside Physic Garden, as
Steel Reinforcement for Fountain 1 at Inner Side of Plant Room , Inside Physic Garden as highlighted
Stack Boulders Installed Layers at levels +878.500 along Open Channel (Boundary wall Side), at Wadi
Stack Boulders Installed Layers at levels +879.00 along Open Channel (Boundary wall Side), at Wadi
Sand Bedding for Low Current Lines of Telecom (from MH/ZG/TC/11 to 12 ), at Maze Garden, as highli
Marking & Check for coordinates of Tree Pits (13 no's) at Left side of Water Play Garden, at highligh
Pre insulated Heat Water Pipes (S&R) 200mmØ( laying ,Aligment ,Leveling and fit up) From point (E
Pre insulated Chiled Water Pipes (S&R) 200mmØ( laying ,Aligment ,Leveling and fit up) From point
Excavation & Compaction Test Prior to Blinding under Gabions Inside Butterfly Garden, at highlighted
Pre insulated Chiled Water Pipes (S&R) 300mmØ( laying ,Aligment ,Leveling and fit up) From point
Stack Boulders Installed Layers at levels +877.1 , along Open Channel (Boundary wall Side), at Wadi #
Stack Boulder Wall for Planting Bed Installed 2 Layers at Discovery GArden along Boundary Walll , At
Inspection & Compaction Tests of 2nd Layer Backfilling Subgrade (Out of 5 Layer) Near SBC-08 Inside
Steel Reinforcements for Energy Center Internal Foundation and Grade Beam at Axis 4-5, C (as highligh
Shuttering for Blinding for strip footing between PC 194-196 zone 2R (as highlighted)
Installation of UPVC conduit (2x110mm dia.) Low Current (Fire and Security) Ductbank no.GG/D-FS/01
Concreting for Diaphragm Wall axis 02AQ (1st stage toc 874.00) (2nd part) (as highlighted) Zone 2N
Shuttering for Large Mosque Lower 1st floor suspended slab and Beams at Axis 1-3, C-F (as highlighted)
Inspection and compaction test 3rd layer for Backfilling at Internal Building at zone 1N (as highlighted
Protection layer of 4mm thick bituminous protection board for ETFE under SOG at Zone 2J (as highlighte
Inspection and compaction test 6th layer for Backfilling at Internal Building at zone 2A (as highlighted)
Inspection and compaction test 3rd layer for Backfilling Around MCPE 4 Axis 01AP ZONE 1P (as highlight
Level and Location for Blinding for strip footing between PC 194-196 zone 2R (as highlighted)
Surface Preparation and Solvent Base Primer for ETFE under SOG at Zone 2J (as highlighted)
Single layer of 4mm thick modified bituminous waterproofing membrane for ETFE under SOG at Zone 2J
Inspection Of Pipe Installation For Irrigation ROW mainline Including Branches; (200mmØ- UPVC-Claa
Inspection Of Pipe Installation For Non-Potable Water (Irrigation Main Line); (200 mmØ- UPVC-Claas-
Steel Reinforcement for Ring Beam zone 1K (outer) Axis 01-AG to 01 AF as highlighted at Crecent.
Concrete pouring for Blinding of boundary wall at Span 47 of Water Garden, as per highlighted Attac
Steel Reinfotcmenet for Slab of New Ticketing Booth # 4A, As per Attached Highlighted Drawing's.
Inspection & Compaction Tests of 1st Layer Backfilling Subgrade (Out of 10 Layers) for SBC-08 (Left Side
Inspection of Installation, Alignment and Bolt Tightening for the Metal Cladding in Crescent 01 Zone
Installation of straight uPVC conduit (Dia. 75mm) Low Voltage Ductbank (Submain, Power & Norma
Installation of UPVC conduit ( dia.75mm ) Low Current Ductbank (TELECOM) in between hanhole (MH
Surface preparation & Base primer coating for internal columns and wall and top side foundation zon
Two coat of bituminous damp proofing coating for internal columns and wall and top side foundation
Concreting for Infill wall inner at Crescent at axis 02O & 02P buttress BII BIV 77 & 78 (As highlighted)
Mock-Up of Stone Cladding for Crescent between axis 02AX-02AW (as highlighted) Zone 2Q
CHB laying upto 872.89 for Pump Room 6084 at Zone 2J axis 02AD (as highlighted) using 20cm CHB
Concreting for MCPE 3 wall & counterfort Zone 2E 2F at axis 02-R to 03-A, 02-2 to 03-1 ,from LEVEL 871
Inspection and compaction test 2nd layer for Backfilling at Internal Building at zone 1N (as highlighted
Inspection and compaction test 4th layer Backfill for Diaphragm wall Zone 2N (as highlighted) SP#125 (4
CHB laying for Pump Room upto lintel beam at Zone 2M axis 02AN (as highlighted) using 20cm CHB
1st Layer of CHB laying for Pump Room at Zone 2M axis 02AN (as highlighted) using 20cm CHB
Concreting for outer Infill wall between Axis 02D-02E (as highlighted) Zone 2B
Shuttering for outer Infill wall between Axis 02D-02E (as highlighted) Zone 2B
Pre insulated Chiled Water Pipes (S&R) 400mmØ( laying ,Aligment ,Leveling and fit up) From point (
Steel Reinforcements for MCPE 1 Duct Tunnel Foundation slab at axis 03S-03T-03U (as highlighted) at
Pipe Sleeves Installation of Outer infill Wall Mechanical condensate From Axis zone 2F 02/2S to 02/
Steel Reinforcements for Large Mosque Lower 1st floor suspended slab and Beams at Axis 1-3, C-F (as h
Planting of HILTI anchor bolt (threaded rod AM 8.8 M24-HDG) by using HILTI Epoxy Mprtar (HIT-HY 200-R
Shuttering for MCPE 1 Duct Tunnel Foundation slab at axis 03S-03T-03U (as highlighted) at Zone 2M 2N
Level and Location for MCPE 1 Duct Tunnel Foundation slab at axis 03S-03T-03U (as highlighted) at Zo
Level and Location for outer Infill wall between Axis 02D-02E (as highlighted) Zone 2B
Level and Location for Infill wall Beam at axis 02AO - 02AN Zone 2M (as highlighted)
Level and Location for Blinding of (2) internal foundation at Zone 2R axis 02BA - 02AZ (as highlighted)
Concreting for MCPE 1 Duct Tunnel Foundation slab at axis 03S-03T-03U (as highlighted) at Zone 2M 2N
Surface preparation & Base primer coating for walls (W16,W17,W18,W22 ,W23,W24,W25,W26,W27,W
Two coat of bituminous damp proofing coating For Walls (W16,W17,W18, W22,W23,W24,W25,W26,W2
Protection layer of 4mm thick bituminous protection board For Walls (W16,W17,W18, W22,W23,W2
Steel Reinforcements for Central Bridge Abutment Wall (as highlighted) Zone 4 Grid 02AK
Shuttering for Infill wall Beam at axis 02AO - 02AN Zone 2M (as highlighted)
Steel reinforcements for Infill wall Beam at axis 02AO - 02AN Zone 2M (as highlighted)
Surface Preparation and Solvent Base Primer Coating for MCPE 2 inner wall At Axis 02AG - 02AH, 03-2 t
Two Layers of 4mm thick modified bituminous waterproofing membrane for MCPE 2 inner wall At Axis 0
Protection layer of 4mm thick bituminous protection board for MCPE 2 inner wall At Axis 02AG - 02AH,
Surface Preparation and Solvent Base Primer Coating under MCPE 1 Duct Tunnel foundation At Axis 03
Two layer of 4mm thick modified bituminous waterproofing membrane under MCPE 1 Duct Tunnel found
Geotextile and screed under MCPE 1 Duct Tunnel foundation At Axis 03S-03T-03U (as highlighted) Zon
2nd Coating of Bituminous Damp Proofing for Energy Center Side of Footing (inner foundation) (as highl
Steel Reinforcements for Devonian Garden Foundation (as highlighted) axis 02AL to 02AN (1st part)
Shuttering for Devonian Garden Foundation (as highlighted) axis 02AL to 02AN (1st part)
Installation of Rock and Boulder No. WRB-55 - 3rd layer (3 of 3)
"Inspection for Installation of Heating and Chilled Water Line Pit G-DC-08, G-DC-15, G-DC-16, K-DC-01,
Inspection of Concrete Pouring for the Footing of SBC-07 - Wing Wall (Right Side) - As Highlighted
Inspection of Formwork for the Footing of SBC-07 - Wing Wall (Right Side) - As Highlighted
Protection layer of 4mm thick bituminous protection board FOR RAFT(1) cafeteria building zone 2A, TOP
Two coat of bituminous damp proofing coating FOR RAFT(1) cafeteria building zone 2A, TOP SIDE (as h
Surface preparation & Base primer coating FOR RAFT(1) cafeteria building zone 2A, TOP SIDE (as highli
Installation of UPVC Conduit (Dia. 110mm) Low Voltage Ducts (Submain Cables) in ETFE room at Pr
Installation of PVC Conduit (Dia. 25mm) and boxes for Lighting System (LED W8/CE, EXIT Sign) at the
Inspection & Compaction Tests of 1st Layer Backfilling Subgrade (Out of 5 Layer) Near SBC-08 Inside
Steel Reinfotcmenet for Slab of New Ticketing Booth # 3A, As per Attached Highlighted Drawing's.
Coordinates & Top levels of Blinding of Boundary Wall at Span 47 of Water Garden, as per highlighte
Installation of Rock and Boulder No. WRB-55 - 2nd layer (2 of 3)
Installation of Rock and Boulder No. WRB-54 - 2nd layer (2 of 4)
Installation of Rock and Boulder No. WRB-25 - 1st layer (1 of 4)
Inspection of Sand bedding under pipe for RO Water Line at Area-B - As highlighted (Stock Pile# 132)
Inspection of Sand Covering to protect the pipe for Non-Potable Water Line at Zone-C - as highlighted
"Inspection for Installation of Heating and Chilled wahter Line Pit G-DH-04, G-DC-06, F-DH-04, F-DC-05
Steel Reinfotcmenet for wall new ticketing booth #6A As per Attached Highlighted Drawing's.
Marking & Check for coordinates of Tree Pits (13 no's) Along Boundary Wall (Inner side), inside Butter
Excavation for Tree Pits (13 no's) Along Boundary Wall (Inner side), inside Butterfly Garden, as highli
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 5) for Non potable water lin
Sand Cover & Protection for Fire Fighting Lines (Pipe dia 50 & 80 mm) from FHC to End of Tunnel, insi
Inspection backfilling Gravel 2nd Layer (2 of 2) For Manholes MH-O-01, MH-O-02, MH-O-03, MH-O-04,
Inspection and Compaction test for backfilling Sub-grade 1st layer (1 of 1) above Sand Covering for RO
inspection for backfilling gravel 1st Layer (1 of 1) for Storm Water Line Manhole MH-O-08-1, MH-O-0
inspection for backfilling gravel 1st Layer (1 of 1) around Potable Water Line Pit for C/PW/06 - as highli
"Inspection of Steel Reinforcement for Slab of MV Line Pulling Pit - L/MV/17, L/MV/02, L/MV/15, G
inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 1) above Sand Covering for N
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 4) for Fire&Security Line Pit
Inspection & Compaction Tests of Single Layer (Sub-Base) Backfilling on Irrigation (Main, Sub & Sleev
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 4) for Telecommunication Line
"Inspection and Compaction test for backfilling Sub-grade 3rd Layer (3 of 6) for Non-Potable water line
Inspection and Compaction test for backfilling Sub-grade 2nd Layer (2 of 6) around MV Line Pit G/MV/3
Inspection and Compaction test for backfilling Sub-grade 4th Layer (4 of 4) for Fire & Security Distribu
inspection and Compaction test for backfilling Sub-grade 4th Layer (4 of 4) for Telecommunications Lin
Inspection of Sand Covering to protect pipe for RO Water Line at Zone-C - As highlighted (Stock Pile#132
Excavation & Bed preparation for Low Current Lines of Telecom (from MH/ZG/TC/11 to 12 ), at Maze G
"Inspection of Excavation for Heating and Chilled Water Line Pit H/DH/16, H/DH/19, H/DH/20, H/DH/2
Inspection of Excavation for Heating and Chilled Water Line at Zone-G - As highlighted
Inspection and Compaction test for backfilling Sub-grade 2nd Layer (2 of 7) around MV Line Pit C/MV/
inspection and Compaction test for backfilling Sub-grade 2nd Layer (2 of 6) around Fire Water Line Pit
Excavation for MV Line Pit B/MV/01, G/MV/37 at Zone-B&G - as highlighted in the attached drawing.
Solvent Base Primer Coating prior to Membrane waterproofing on Blinding of Fountain of Geyser Gard
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 5) For Manholes MH-O-03, MH
Surface preparation of blinding prior to start Waterproofing under foundation of Fountain of Geyse
Inspection for Casting the Blinding Concrete under the Manhole MH-O-11 and gullies G-O-10, G-O-11 an
Excavation and Soil Preparation prior to start backfilling Layers for Roads, Starting from ST.0+000 to 0+
Solvent Base Primer Coating prior to Membrane waterproofing on Blinding of Fountain (3), inside Phy
Inspection & Compaction tests of 6th Layer Backfilling (Sub-Grade) (Out of 7 layers) Behind Boulders
Surface Preparation Prior to Backfilling, at entrance of Boat garden, Inside Water Garden as highligh
Excavation & Surface Preparation Prior to Cast Blinding of boundary wall @ span 47 @ Water Garden a
'Warning Tape Pipe Installation For Non-Potable Water(Irrigation Line); (200mmØ- UPVC-Claas-5); A
Inspection and compaction test 1st layer for Backfilling at Internal Building at zone 1N (as highlighted)
Inspection and compaction test 12th layer Backfill for MCPE 2 Axis 02AB-02AD, Zone 2J (as highlighted)
Inspection and compaction test 17th layer Backfill at cafeteria W33 Axis 02D - 02E, Zone 2B (as highlig
Inspection and compaction test 2nd layer for Backfilling Around MCPE 4 Axis 01AP ZONE 1P (as highligh
Surface Preparation and Solvent Base Primer under foundation of Devonian garden AUH room Zone 2M
Single layer of 4mm thick modified bituminous waterproofing membrane under foundation of Devonia
Geotextile and 50mm screed under foundation of Devonian garden AUH room Zone 2M Axis 02AL to 02A
Shuttering for Kicker of Infill wall for Zone 1A between Axis 01A-01B-01C-01D (PC 1-3-5, 2-4-6-8) (as hig
2nd layer of bituminous damp proofing for Energy Center Side of Footing (inner foundation) (as highlight
1st Coating of Bituminous Damp Proofing for Energy Center Side of Footing (inner foundation) (as highli
1st Layer of CHB laying for Pump Room 6084 at Zone 2J axis 02AD (as highlighted) using 20cm CHB
Protection layer of 4mm thick bituminous protection board for BOV-62, W20 up to level 863.45 at
Surface preparation & Base primer coating for Butress , Top pilcap & Coloumns up S.O.G. 870.40 BOI
'Warning Tape For Inspection Of Pipe Installation For Irrigation ROW mainline Including Branches;
Single layer of 4mm thick modified bituminous waterproofing membrane for BOV-62, W20 up to level
'Warning Tape For Non-Potable Water (Irrigation Main Line); (200 mmØ- UPVC-Claas-5 ) ; As per Hig
Protection layer of 4mm thick bituminous protection board for BIV,BII-59, up to level 863.45 at CRESC
Single layer of 4mm thick modified bituminous waterproofing membrane for BIV,BII-59, up to level 86
Shuttering for Infill wall (stiffiner) on Axis 02Q & 02R (as highlighted) Zone 2E
Surface preparation & Base primer coating for BIV,BII-59, up to level 863.45 at CRESCENT (as highlight
Concreting for Infill wall (stiffiner) on Axis 02Q & 02R (as highlighted) Zone 2E
Single layer of 4mm thick modified bituminous waterproofing membrane for ETFE pump room axis 2j
Level and Location for Infill wall (stiffiner) on Axis 02Q & 02R (as highlighted) Zone 2E
Protection layer of 4mm thick bituminous protection board for ETFE pump room axis 2j level 869.20 a
Shuttering for Infill wall beam (inner) at axis 02R - 02S Zone 2F (as highlighted)
Surface preparation & Base primer coating for ETFE pump room axis 2j level 869.20 at CRESCENT (as hi
Concreting for Infill wall beam (inner) at axis 02R - 02S Zone 2F (as highlighted)
Shuttering and Concreting for Energy Center Columns (37 nos) at Grid 29 to 30 N - R (as highlighted)
Level and Location for Energy Center Columns (37 nos) at Grid 29 to 30 N - R (as highlighted)
Level and Location for Infill wall beam (inner) at axis 02R - 02S Zone 2F (as highlighted)
Surface preparation & Base primer coating for Foundation and walls and clomns ( C-10 ,C-11,C-25,C-
Steel Reinforcements for inner Infill wall at zone 2C axis 02H to 02I (AS HIGHLIGHTED)
Two coat of bituminous damp proofing coating for Foundation and walls and clomns ( C-10 ,C-11,C-
Steel Reinforcements for Buttress Head at BO BI 57, 58 (as highlighted) at Zone 1P (KAIG3-SCR-CO-S-198
Steel Reinforcements for MCPE 3 wall at axis 02P (as highlighted) at Zone 2E 2F (KAIG3-SCR-MC-S-191-0
Installation and Survey Report for Location and Levels of Retaining wall front canopy Corbel Anchor B
Shuttering for Retaining wall front canopy Corbel Between Axis 01AH-01AO (as highlighted) Zone 1
Level and Location for Retaining wall front canopy Corbel Between Axis 01AH-01AO (as highlighted) Zon
Steel Reinfocements for Retaining wall front Canopy Corbel Between Axis 01AH-01AO (as highlighted) Z
Surface Preparation Prior to start Backfilling at cafeteria raft area axis 02-2 , 02-1 Zone 2A (as highlighte
Concreting for Infill wall between axis 01P-01Q (as highlighted) Zone 1F
Shuttering for plain concrete for Devonian Garden between axis 02-AO to 02-AM zone 2M (as highli
Level and Location for Excavation of Jurassic Garden (as highlighted) Zone 2G
Concretring for plain concrete for Devonian Garden between axis 02-AO to 02-AM zone 2M (as high
Level and Location for MCPE 3 wall & counterfort Zone 2E 2F at axis 02-R to 03/A, 02-2 to 03-1 ,from L
Shuttering for MCPE 3 wall & counterfort Zone 2E 2F at axis 02-R to 03/A, 02-2 to 03-1 ,from LEVEL 871
Steel Reinforcements for (1) Infill wall between Axis 01P-01Q (as highlighted) Zone 1F
Concreting for walls (W28,W29,W30,) at CAFETERIA zone 2A (as highlighted) Level 867.45
Installation of PVC Conduit (Dia. 25mm) & Boxes for Power System (Fused Connection, Socket Outlet,
Level and Location for (1) Infill wall between Axis 01Q-01R (as highlighted) Zone 1F
Concreting for internal RC foundation of NORTH ADMINSTRATION building at CRESCENT between axis 0
Concreting for ETFE PUMP ROOM Slab on Grade at axis 02-AR zone 2N (as highlighted) at CRESCENT, K
Level and Location for Infill wall between axis 01/P-01/Q (as highlighted) Zone 1F
Shuttering for (1) Infill wall between Axis 01Q-01R (as highlighted) Zone 1F
Shuttering for Infill wall between axis 01P-01Q (as highlighted) Zone 1F
Surface Preparation Prior to start Backfilling at Internal Building at zone 1N (as highlighted) Axis 01-2
Installation of PVC Conduit (Dia. 75mm) and Junction Box for LC System at the New Ticket Booth No. (
Inspection and compaction test 3rd layer for Backfilling at Inside cafeteria axis 02-D to 0 2-C , 02/2
Level and Location for internal RC foundation of NORTH ADMINSTRATION building at CRESCENT between
Inspection and compaction test 3rd layer for Backfilling at MCPE 1 Zone 2N (as highlighted) axis 03V, 0
Installation of PVC Conduit (Dia. 25mm) and Box for Voice and Data System (CAM, DATA & Telephone)
Level and Location for MCPE 1 Suspended Slab at Axis 03T-03U, 03-1 to 03-2 (as per KAIG3-SCR-CO-S-01
Installation of PVC Conduit (Dia. 25mm) and Box for Security System (CAM, Door Controller, Magnetic
Installation of PVC Conduit (Dia. 25mm) and Box for Fire Alarm System (Break Glass) at the New Ticke
Steel reinforcements for Infill wall beam (inner) at axis 02R - 02S Zone 2F (as highlighted)
Steel Reinforcements for Energy Center Beams at Grid 7 to 11 A (as highlighted) 875.35
Steel Reinforcements for Zone 2J ETFE Pump Room 6084, ST-2 at axis 02AD (as highlighted) level 872.87
Steel Reinforcements for MCPE 1 Suspended Slab at Axis 03T-03U, 03-1 to 03-2 (as per KAIG3-SCR-CO-S
Shuttering for MCPE 1 Suspended Slab at Axis 03T-03U, 03-1 to 03-2 (as per KAIG3-SCR-CO-S-0138-01) A
Concreting for MCPE 1 Suspended Slab at Axis 03T-03U, 03-1 to 03-2 (as per KAIG3-SCR-CO-S-0138-01) A
Steel reinforcements for Infill wall inner at axis 02U - 02V Zone 2F (as highlighted)
Surface Preparation and Paint Touch Up Inspection of Partition wall Crescent 02, Zone 3 - 2N Axis 02A
Concreting for (1) Infill wall between Axis 01Q-01R (as highlighted) Zone 1F
Final Inspection for the MAnagement Building from Grid Line E-F-G/03 to 06, P-Q-R/03 to 06 as per hi
"Inspection and Compaction test for backfilling Sub-grade 3rd Layer (3 of 6) for Non-Potable water lin
Aluminum Cap Installation between Axis 02/AT-02/AU.
Aluminum Cap Installation between Axis 02-AU-02/AV.
Aluminum Cap Installation between Axis 02-AV-02/AW.
Base Seal and Extrusion Aluminum Installation between Axis 01/O-01/P.
Base Seal and Extrusion Aluminum Installation between Axis 01/N-01/O.
Inspection of Blinding Concrete under Heating & Chilled Water Line Isolation Pit for F/DH/04, F/DC/01,
Inspection for Laying of GreenTiles above the pipe for Fire & Security Distribution Line from C/FS/46 to
Inspection for Laying of Green Tiles and Warning Tape above the pipe for Telecommunication Line from
Surface Preparation prior to start backfilling for Non potable water line pit POC-9, POC-10 and POC-11
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 6) around MV Line Pit G/MV/37
Inspection and Compaction test for backfilling Sub-grade 3rd Layer (3 of 4) for Fire & Security Distribu
inspection and Compaction test for backfilling Sub-grade 3rd Layer (3 of 4) for Telecommunications Lin
"Inspection and Compaction test for backfilling Sub-grade 6th Layer (6 of 6) for Non-Potable water lin
Inspection and Compaction test for backfilling Sub-grade 6th Layer (6 of 6) around MV Line Pit G/MV/1
Inspection and Compaction test for backfilling Sub-grade 4th Layer (4 of 4) for Fire&Security Line Pit G
Inspection of Concrete Pouring for footing of MV Line Pulling Pit - D/MV/18 at Zone- D (As Highlighted)
Inspection of Formwork for footing of MV Line Pulling Pit - D/MV/18 at Zone- D (As Highlighted)
Inspection of Blinding Concrete under Heating & Chilled Water Line Isolation Pit for G/DH/02, G/DH/
Inspection of Excavation for RO Water Line at Area-B - As highlighted
Inspection and Compaction test for backfilling Sub-grade 4th Layer (4 of 4) for Telecommunication Line
Inspection of Sand Covering to protect pipe for RO Water Line at Zone-B&C - As highlighted (Stock Pile#
Inspection and Compaction test for backfilling Sub-grade 3rd Layer (3 of 4) for Telecommunication Lin
Inspection and Compaction Test for NGL of Storm Water Line Branch - at Zone-3 - as highlighted
Inspection of Concrete Pouring for Wall and Top Slab of SBC-07 - (Left Side) - As Highlighted
Inspection of Formwork for Wall and Top Slab of SBC-07 - (Left Side) - As Highlighted
Inspection of Excavation for Heating and Chilled Water Line at Zone-F including Pit F/DC/01 & F/DC/02 -
"Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 4) for Footing and Column Nec
Steel Reinforcements for 1st floor walls at SOUTH SMALL MOSQUE (as highlighted) from level 873.15 to
Steel Reinforcements for internal RC foundation of NORTH ADMINSTRATION building at CRESCENT betw
Shuttering for internal RC foundation of NORTH ADMINSTRATION building at CRESCENT between axis 02
Two layers of 4mm thick modified bituminous waterproofing membrane for retaining wall & foundation (
Inspection and compaction test 4th layer for Backfilling at Inside cafeteria axis 02-D to 0 2-C , 02/2 Zo
Inspection and compaction test 6th layer for Backfilling inside Cafeteria building btween Axis 02A - 02D
Inspection and compaction test 3rd layer Backfill for Diaphragm wall Zone 2N (as highlighted) SP#125 (3
Level and Location for plain concrete for Devonian Garden between axis 02-AD to 02-AM zone 2M (
'Warning Tape For Non-Potable Water (Irrigation Main Line); (40 mmØ- UPVC-Class-5) ; As per High
Steel Reinforcements for (6) columns Axis 92-30 /Q - R , level 875.50 zone 5A(as highlighted),at ENER
Steel Reinforcements for beam Axis 01-14 / I - L , level 875.35 zone 5A(as highlighted),at ENERGY CEN
'Warning Tape Pipe Installation for Inspection Irrigation ROW mainline Including Branches; (200mm
Inspection Of Pipe Installation For Non-Potable Water (Irrigation Main Line); (200 mmØ- UPVC-Claas-
Pre insulated Chiled Water Pipes (S&R) 200mmØ( laying ,Aligment ,Leveling and fit up) From point (
Pre insulated Heat Water Pipes (S&R) 150mmØ( laying ,Aligment ,Leveling and fit up) From point (E
HDPE Pipe Installation of Water Features pipes; (160&63mmØ SDR11-PE100); As per High lighted At
Installation of Straight PVC Conduit (Dia. 25mm) and Box for Voice Data (WIFI & CAM) in the Crescent
Installation of Straight PVC Conduit (Dia. 25mm) and Box for Security (CAM) in Crescent - 01 Infill W
Installation of straight PVC conduit (dia.25mm) and Box for Fire Alarm (Speaker) at Crescent - 02 Infil
Installation of straight PVC conduit (dia.32mm) and Box for Lighting (Exit Light) at Crescent - 02 Infi
Installation of EMT Conduit (Dia. 3/4, 1 inch.) and Box (Ceiling Mounted) for Lighting (E1,E1/CE,CA,
Installation of Rock and Boulder in Wadi-03 (Right Side) - 5th layer (5 of 7)
"Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 4) for Footing and Column Nec
Inspection of Sand Covering to protect pipe for RO Water Line at Zone-B - As highlighted (Stock Pile#132
Inspection and Compaction Test for backfilling Gravel 1st Layer (1 of 1) For Manholes MH-O-01, MH
Surface Preparation prior to start backfilling around MV Line Pit G/MV/37 at Zone-G (As Highlighted)
Inspection and Compaction test for backfilling Sub-grade 2nd Layer (2 of 4) for Fire & Security Distrib
inspection and Compaction test for backfilling Sub-grade 2nd Layer (2 of 4) for Telecommunications Li
"Inspection and Compaction test for backfilling Sub-grade 5th Layer (5 of 6) for Non-Potable water lin
Inspection and Compaction test for backfilling Sub-grade 5th Layer (5 of 6) around MV Line Pit G/MV/
Inspection and Compaction test for backfilling Sub-grade 3rd Layer (3 of 4) for Fire&Security Line Pit G
Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 14) around foul water line m
Concrete Pouring & Shuttering for Wall at Grid (14/A-B), inside Butterfly Garden, as highlighted in a
Steel Reinforcement for Wall at Grid (14/A-B), inside Butterfly Garden, as highlighted in attached dra
Coordinates & Levels for Wall at Grid (14/A-B), inside Butterfly Garden, as highlighted in attached dr
Surface preparation of blinding prior to start Waterproofing under foundation of Fountain (3) Inside
Aluminium Flashing & Sealant on Water Proofing for foundation & Kickers of Boundary wall (Inner &
Surface Preparation and Solvent Base Primer Coating for MCPE 2 inner wall At Axis 03I - 02AB (as highl
Shuttering for Diaphragm Wall axis 02AQ (1st stage toc 874.00) (2nd part) (as highlighted) Zone 2N
Concreting for Diaphragm Wall axis 02AQ (1st stage toc 874.00) (2nd part) (as highlighted) Zone 2N
Level and Location for Diaphragm Wall axis 02AQ (1st stage toc 874.00) (2nd part) (as highlighted) Zone
Level and Location for Excavation of RETAINING WALL at Axis 02E to 02I (as highlighted) Zone 6 & 7
Shuttering for RETAINING WALL Blinding under foundation at Axis 02E to 02I (as highlighted) Zone 6 & 7
Concreting for RETAINING WALL Blinding under foundation at Axis 02E to 02I (as highlighted) Zone 6 & 7
Level and Location for RETAINING WALL Blinding under foundation at Axis 02E to 02I (as highlighted) Zo
Steel Reinforcements for Kicker of Infill wall for Zone 1A between Axis 01A-01B-01C-01D (PC 1-3-5, 2-4-6
Concreting for Infill wall between Axis 02H-02G (as highlighted) Zone 2C
Sand Covering Layer for Protection of Fire & Security Line from (C/FS/46 to C/FS/47) at Zone-C as highl
Sand Covering Layer for Protection of Telecommunications Line from (C/TL/49 to C/TL/51) at Zone-C as
inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 6) for Non potable water line p
"inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 9) for Storm Water Line M
inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 6) around Potable Water Line
inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 7) around MV Line Pit C/MV/
inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 6) around Fire Water Line Pit f
Inspection of Concrete Pouring for Wall of MV Line Pit - E/MV/02, E/MV/05, E/MV/01 and E/MV/03 at Zo
Inspection of Formwork for Wall of MV Line Pit - E/MV/02, E/MV/05, E/MV/01 and E/MV/03 at Zone-E (A
inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 4) for Fire & Security Distribu
inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 4) for Telecommunications Lin
"Inspection and Compaction test for backfilling Sub-grade 2nd Layer (2 of 6) for Non-Potable water line
"Inspection and Compaction test for backfilling Sub-grade 4th Layer (4 of 6) for Non-Potable water lin
Inspection and Compaction test for backfilling Sub-grade 4th Layer (4 of 6) around MV Line Pit G/MV/
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 10) around foul water line m
Inspection and Compaction test for backfilling Sub-grade 2nd Layer (2 of 4) for Telecommunication Lin
Inspection and Compaction test for backfilling Sub-grade 2nd Layer (2 of 4) for Fire&Security Line Pit G
Inspection of Concrete Pouring for Footing of MV Line Pulling Pit - H/MV/19, L/MV/16, L/MV/05 and L/
Inspection of Formwork for Footing of MV Line Pulling Pit - H/MV/19, L/MV/16, L/MV/05 and L/MV/01 a
Surface Preparation prior to start backfilling for Fire&Security Line Pit G/FS/01 at zone G (As Highlighte
Excavation for Storm Water Line from MH-G-14 to MH-G-12 including branch and Manhole MH-G-14, MH
Inspection of Sand Covering to protect the pipe for Non-Potable Water Line at Zone-L&M - as highlighte
"Inspection of Excavation for MV Line Pulling Pit - L/MV/16, L/MV/05, L/MV/01 - as highlighted "
Inspection of Formwork for footing of MV Line Pit - E/MV/02, E/MV/05, D/MV/04, D/MV/32 and D/MV/0
Excavation for Storm Water Line from MH-M-09 to MH-M-04 including Manhole MH-M-09, MH-M-08,
Surface Preparation prior to start water proofing for MV Line Pit C/MV/22, C/MV/25, C/MV/40, C/MV/3
Surface Preparation and Paint Touch Up Inspection for the Metal Cladding in Crescent 01, Zone-3 1G
Bolt Tightening Inspection of Crescent 01, Zone 1 - 1L, 1M & 1N from Axis 01AG to 01AP
Surface Preparation and Paint Touch Up Inspection in Crescent 01 Zone 3, 1G from Axis 01S to 01W
Concreting for Grade Beam Blinding of Child care (as highlighted) Zone 2N
Level and Location for Beam of Energy Center Axis 18-28-R Level 875.5 (as highlighted)
Inspection and compaction test 1st & 2nd layer for Backfilling at Inside cafeteria axis 02-D to 0 2-C ,
Inspection and compaction test 11th layer Backfill for MCPE 2 Axis 02AB-02AD, Zone 2J (as highlighted)
Inspection and compaction test 5th and 6th layer for Backfilling at Internal Building at zone 2A (as high
Steel Reinforcements for Infill wall at zone 2Q axis 02BB to 02BC (BOI 127-128) (AS HIGHLIGHTED)
Steel Reinforcements for inner Infill wall at zone 1C axis 01I to 01J (BII 11-12) (AS HIGHLIGHTED) (2nd St
Shuttering and Concreting for Beam of Energy Center Axis 18-28-R Level 875.5 (as highlighted)
Steel Reinforcements for 10 Columns (as highlighted) at Energy Center Axis 28-30
Concreting for Infill outer wall at Crescent between (02-AW & 02-AX) (As highlighted) ZONE 2Q
Concreting for RC foundation of Retaining Wall at axis 02/M to 01/A Zone 6 & 7 at CRESCENT (as highli
Concreting for internal Column of Adminstration building at Crescent between axis 02-BB & 02-BC Zone
Concreting for MCPE 1 duct tunnel Blinding under foundation at axis 03U, 03S, 03T, 03-1 to 02-2 Zone 2
Concreting for outer Infill wall between Axis 01F-01G (as highlighted) Zone 1B
Two layer of 4mm thick modified bituminous waterproofing membrane for TUNNEL 1 wall (outer) Zone 2
Protection layer of 4mm thick bituminous protection board for TUNNEL 1 wall (outer) Zone 2H PART C (a
Shuttering for abutment wall upto level 864.60 to 866.00 at CENTRAL BRIDGE zone 4 grid 02AL - 02AK (a
Level and Location for abutment wall upto level 864.60 to 866.00 at CENTRAL BRIDGE zone 4 grid 02AL -
Concreting for abutment wall upto level 864.60 to 866.00 at CENTRAL BRIDGE zone 4 grid 02AL - 02AK (
"Inspection and compaction test for 1st layer under lower EPDM for cretaceous garden zone 2D,2E (
nspection and compaction test 1st layer for Backfilling Around MCPE 4 Axis 01AP ZONE 1P (as highlight
Inspection and compaction test 11th layer for backfilling at MCPE 2 Zone 2H axis 02/AB to 02/AA (as hi
Protection layer of 4mm thick bituminous protection board FOR RAFT(1) foundation cafeteria building
Two coat of bituminous damp proofing coating FOR RAFT(1) foundation cafeteria building zone 2A, ON
Surface preparation & Base primer coating FOR RAFT(1) foundation cafeteria building zone 2A, ONLY FO
'Warning Tape Pipe Installation For Irrigation ROW main Line Including Branches; (200mmØ- UPVC-Cl
'Warning Tape Pipe Installation For Non-Potable Water (Irrigation Main Line); (200 mmØ- UPVC-Claas
Inspection Of Pipe Installation For Non-Potable Water (Irrigation Main Line); (200 mmØ- UPVC-Claas-
Pipe Sleeves Installation of Outer infill Wall Mechanical CHW (S&R) From Axis (02/2G to 02/H ) At C
Installation of straight UPVC Conduit (Dia. 160mm) Medium Voltage Ductbank no. CC/D-MV/03 (from
Concrete Pouring & Shuttering for Columns (above the level +872.35) of Boundary Wall @ Grid (R/18-2
Surface Preparation prior to backfilling inside Cafeteria building btween Axis 02A - 02D zone 2A (as H
Installation of UPVC conduit ( dia.75mm ) Low Current Ductbank (Fire and Security) in betwee
Installation inspection of the Wire mesh panels for the Rectangular and triangle frames in the Aviary
Installation Inspection of the Wiremesh Panels for the rectangular and triangle frames in the Aviary
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 4) around MV Line Pit C/M
Inspection and Compaction test for backfilling Sub-grade 3rd Layer (3 of 6) around MV Line Pit G/MV/
Inspection and Compaction Test for backfilling Sub-grade 6th Layer (6 of 6) around Non potable water
"Inspection of Grouting (Horizontal & Vertical Joints) for Rock Boulder - RB-074 for All Layers"
Installation of Rock and Boulder No. WRB-55 - 1st layer (1 of 3)
Surface Preparation prior to start backfilling for Fire & Security Distribution Line pit B/FS/03 and B/FS/
Surface Preparation prior to start backfilling for Telecommunications Line pit B/TL/30 and B/TL/31 at Zo
INSPECTION FOR INSTALLATION OF SLAB FOR C/MV/23 and C/MV/40 at zone C (As Highlighted)
"Inspection of Concrete Pouring for Side Walls of MV Line Pulling Pit - B/MV/11 at Zone-B (As Highlighte
"Inspection of Formwork for Side Walls of MV Line Pulling Pit - B/MV/11 at Zone-B (As Highlighted) "
Sand Covering Layer for Protection of Fire & Security Line between (G/FS/19 and G/FS/24) at Zone-G as
Sand Covering Layer for Protection of Telecommunications Line between (G/TL/16 and G/TL/41) at Zone
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 3) beside the Telecommunicat
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 3) beside the Fire&Security L
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 5) For Manholes MH-O-01
Inspection and Compaction test for backfilling Sub-grade 2nd Layer (2 of 4) around MV Line Pit C/M
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 2) above Sand Covering for RO
Inspectionand Compaction Test for backfilling Sub-grade 2nd Layer (2 of 3) above Sand Covering for No
Inspection of Sand Bedding under pipe for Heating and Chilled Water Line at Zone-G - As highlighted (St
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 4) for Footing and Column Neck
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 4) for Footing and Column Neck
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 10) around foul water line ma
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 4) for Telecommunication Line
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 4) for Fire&Security Line Pit G/
Pre insulated Chiled Water Pipes (S&R) 200mmØ( laying ,Aligment ,Leveling and fit up) From point (
Inspection and compaction test 10th layer Backfill for MCPE 2 Axis 02AB-02AD, Zone 2J (as highlighted)
Surface preparation & Base primer coating for Infill wall bw BOI 126_127 BII 128_127_126 zone 2R up S.
Level and Location for Internal Building coumns (C11, C10, C9, C69) between axis 02BA to 02AZ (as highl
Level and Location for Strip Footing blinding between PC 5-7 Zone 1A (as highlighted)
Level and Location for Infill wall Beam at axis 02P - 02Q Zone 2E (as highlighted)
Level and Location for Retaining wall (wall) Between Axis 01A-02O (as highlighted) Zone 6
Level and Location for outer Infill wall between Axis 01F-01G (as highlighted) Zone 1B
Level and Location for MCPE 3 Ground Slab at axis 03-2, 03-1, 02P (as highlighted) Zone 2E & 2F level
Shuttering for Strip Footing blinding between PC 5-7 Zone 1A (as highlighted)
Base Primer Coating prior to Damp proofing for footings (inner Side) of Boundary wall @ grid (01-C1), i
Surface preparation prior to waterproofing for footings (inner Side) of Boundary wall @ grid (01-C1), in
Inspection and compaction test 10th layer for backfilling at MCPE 2 Zone 2H axis 02/AB to 02/AA (as hi
Steel reinforcements for Infill wall Beam at axis 02P - 02Q Zone 2E (as highlighted)
Shuttering for Infill wall Beam at axis 02P - 02Q Zone 2E (as highlighted)
Inspection and compaction test 2nd layer Backfill for Diaphragm wall Zone 2N (as highlighted) SP#125 (
Concreting for Infill wall Beam at axis 02P - 02Q Zone 2E (as highlighted)
Shuttering for Retaining wall (wall) Between Axis 01A-02O (as highlighted) Zone 6
Concreting for Retaining wall (wall) Between Axis 01A-02O (as highlighted) Zone 6
Steel Reinforcements for Diaphragm Wall axis 02AQ (2nd part) (as highlighted) Zone 2N
Shuttering for outer Infill wall between Axis 01F-01G (as highlighted) Zone 1B
Surface Preparation Prior to start Backfilling at Inside cafeteria axis 02-D to 0 2-C , 02/2 Zone 2A (as hi
Inspection and compaction test 16th layer Backfill at cafeteria W33 Axis 02D - 02E, Zone 2B (as highlig
Inspection and compaction test 4th layer for Backfilling at Internal Building at zone 2A (as highlighted)
Steel Reinforcements for MCPE 3 Ground Slab at axis 03-2, 03-1, 02P (as highlighted) Zone 2E & 2F le
Concretring for Infill outer wall between (01H & 01G) (As highlighted) ZONE 1C
Shuttering for MCPE 3 Ground Slab at axis 03-2, 03-1, 02P (as highlighted) Zone 2E & 2F level 871.00
Concreting for MCPE 3 Ground Slab at axis 03-2, 03-1, 02P (as highlighted) Zone 2E & 2F level 871.00
Concreting for Internal Building coumns (C11, C10, C9, C69) between axis 02BA to 02AZ (as highlighted)
Concreting for columns (C1,C2A,C2B,C3A,C3B)at south Small MOSQUE from level 873,15 up to level 876
Shuttering for Internal Building coumns (C11, C10, C9, C69) between axis 02BA to 02AZ (as highlighted)
Shuttering for columns (C1,C2A,C2B,C3A,C3B)at south Small MOSQUE from level 873,15 up to level 876.2
Shuttering and Concreting for Energy Center Columns (TOC 875.00) at Grid 22 to 28 M (as highlighted)
Steel Reinforcements for Energy Center Columns (21 nos) at Grid 29 to 30 N (as highlighted)
1st layer of bituminous damp proofing for Energy Center Side of Footing (inner foundation) (as highlighte
Shuttering for Strip Footing between PC 128-130 Zone 2F (as highlighted) (in reference to SCR-0188-01)
Concreting for Strip Footing between PC 128-130 Zone 2F (as highlighted) (in reference to SCR-0188-01)
Concreting for ETFE PUMP ROOM Slab on Grade at axis 01-I zone 1C (as highlighted) at CRESCENT TOC
Surface preparation & Base primer coating for pile cap ( PC-92, 91 )top side axis 02-A at CRESCENT (a
Steel Reinforcements for outer wall with counter fort at Axis 02S-02T (as highlighted) Zone 2F
Shuttering for Infill wall between Axis 02H-02G (as highlighted) Zone 2C
Surface preparation & Base primer coating for BOV,BOI-59 , W1,2 up to level 863.45 axis 02-A at CRES
Level and Location for Energy Center Columns (TOC 875.00) at Grid 22 to 28 M (as highlighted)
Level and Location for Strip Footing between PC 128-130 Zone 2F (as highlighted) (in reference to SCR-
Inspection and compaction test 3rd layer for Backfilling at Internal Building at zone 2A (as highlighted)
Level and Location for Retaining wall (FOUNDATION) Between Axis 02M-02L (as highlighted) Zone 6
Level and Location for Infill wall between Axis 02H-02G (as highlighted) Zone 2C
Steel Reinfocements for Retaining wall (FOUNDATION) Between Axis 02M-02L (as highlighted) Zone 6
Shuttering for Retaining wall (FOUNDATION) Between Axis 02M-02L (as highlighted) Zone 6
Concreting for Retaining wall (FOUNDATION) Between Axis 02M-02L (as highlighted) Zone 6
Inspection and compaction test 13th and 14th layer for Backfilling strip footing at CRESCENT between
Shuttering for ETFE PUMP ROOM Slab on Grade at axis 01-I zone 1C (as highlighted) at CRESCENT TOC
Level and Location for ETFE PUMP ROOM Slab on Grade at axis 01-I zone 1C (as highlighted) at CRES
Inspection of Sand Covering to protect pipe for RO Water Line at Zone-B&G - As highlighted (Stock Pile#
Inspection of Sand Covering to protect the pipe for Non-Potable Water Line at Zone-B&G - as highlighte
Inspection of Sand Covering to protect the pipe for Potable Water Line at Zone-B&G - as highlighted (sto
Inspection of Sand Covering to protect the pipe for Fire Water Line at Zone-B&G - as highlighted (Stock
Steel Reinfocements for Retaining wall (wall) Between Axis 01A-02O (as highlighted) Zone 6
Surface Preparation prior to start backfilling for Non potable water line pit POC-18 at zone C - As Highli
Inspection and Compaction test for backfilling Sub-grade 2nd Layer (2 of 4) around MV Line Pit H/M
Protection Sealant for retaining wall outer side at CRESCENT (as highlighted) Zone 1N,1M,1L,1K,1J
Aluminium Flashing ( 2.0mm THICK & 50mm TOTAL GIRTH )for retaining wall outer side at CRESCENT (a
Inspection and Compaction Test for backfilling Sub-grade 5th Layer (5 of 5) upto blinding level for ex
Steel Reinforcements for ETFE PUMP ROOM Slab on Grade at axis 01-I zone 1C (as highlighted) at CR
Concreting for Infill Wall at Zone 2R TIP WALL upto 873.475 (as highlighted)
"Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 6) for Non-Potable water line
"Inspection and Compaction test for backfilling Sub-grade 2nd Layer (2 of 6) for Non-Potable water lin
Surface Preparation and Paint Touch Up Inspection for the Metal Cladding in Crescent 01, Zone-3 1F f
Inspection and Compaction test for backfilling Sub-grade 2nd Layer (2 of 6) around MV Line Pit G/MV/
Inspection and Compaction Test for backfilling Sub-grade 5th Layer (5 of 6) around Non potable water
Surface Preparation Prior to start Backfilling at MCPE2 inner axis 02AD-02AH (as highlighted) zone 2J 2K
Inspection of Steel Reinforcement for the Top Slab of SBC-07 - (Left Side) - As Highlighted
Surface Preparation prior to start backfilling for SBC-08 (Left Side) - Footing and wall of Wing Wall - as
Surface Preparation and Paint Touch Up Inspection in Crescent 01 Zone 3, 1F from Axis 01P to 01S
Inspection and compaction test 5th & 6th layer for Backfilling at Internal Building at zone 1N 1P (as hi
Inspection of Sand bedding under pipe for Potable Water Line at Zone-B - as highlighted (stock Pile# 132
Inspection of Sand bedding under pipe for Non-Potable Water Line at Zone-B&G - as highlighted
Inspection of Sand bedding under pipe for Fire Water Line at Zone-B&G - as highlighted (Stock Pile# 132
Inspection of Sand bedding under pipe for RO Water Line at Zone-B - As highlighted (Stock Pile#132)
Single layer of 4mm thick modified bituminous waterproofing membrane for BOV,BOI-59 , W1,2 up to l
Inspection for Blinding Concrete under Non-Potable Water Line Isolation Pit for POC-44 at Zone-K - as h
Protection layer of 4mm thick bituminous protection board for BOV,BOI-59 , W1,2 up to level 863.45 ax
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 5) For Manholes MH-O-01
Inspection for casting concrete for short piece and Surface Preperation prior to start waterproofing f
Protection layer of 4mm thick bituminous protection board for pile cap ( PC-92, 91 )top side axis 02-A
Surface Preparation prior to start backfilling for Telecommunication Line Pit G/TL/08 at Zone-G - as high
Single layer of 4mm thick modified bituminous waterproofing membrane for pile cap ( PC-92, 91 )top s
Surface Preparation prior to start backfilling around MV Line Pit C/MV/19 and C/MV/18 at Zone-C (As H
Surface Preparation prior to start backfilling for Footing and Column Neck of Seating Area (1) at Zone-K
Grouting for Stone Cladding of Boundary wall (Outer Side) at Span 35, 36, 37 & 38, As per Attached H
Installation of straight PVC conduit (Dia. 75mm) Low Voltage Ductbank (Emergency) in betwen han
Installation of Rock and Boulder No. WRB-54 - 1st layer (1 of 4)
"Inspection for Installation of MV Line Pit Slab - C/MV/13, C/MV/31, C/MV/21, C/MV/19, C/MV/18,
Inspection of Blinding Concrete under Heating & Chilled Water Line Isolation Pit for G/DC/15, G/DC/08
"Inspection for Blinding Concrete under MV Line Pit - C/MV/13 and C/MV/20 at Zone-C (As Highlighted)
Base Seal and Aluminum Extrusion installation between Axis 01/M - 01/N
Inspection of Sand bedding under pipe for Non-Potable Water Line at Zone-G&K - as highlighted (Stock P
Surface Preparation prior to start backfilling around MV Line Pit G/MV/18 and G/MV/14 at Zone-G - As
Shuttering for ETFE PUMP ROOM Slab on Grade at axis 02-AN zone 2M (as highlighted) at CRESCENT,
Level and Location for ETFE PUMP ROOM Slab on Grade at axis 02-AN zone 2M (as highlighted) at CR
Surface Preparation prior to start backfilling for Fire&Security Line Pit G/FS/24 at Zone-G (As Highlighte
Surface Preparation prior to start backfilling for Telecommunication Line Pit G/TL/41 at Zone-G - as high
"Surface Prepatio prior to start backfilling for Non-Potable water line Pit - NPW-ISC-30 at Zone D - as hi
Inspection and Compaction test for backfilling Sub-grade 2nd Layer (2 of 3) beside the Fire&Security
Inspection and Compaction test for backfilling Sub-grade 2nd Layer (2 of 3) beside the Telecommunica
Surface preparation & Base primer coating for BOV,BOI-60 , C(9) and infill wall outer axis 02-A to 02-
Protection layer of 4mm thick bituminous protection board for BOV,BOI-60 , C(9) and infill wall outer
Inspection and Compaction Test for backfilling Sub-grade 4th Layer (4 of 5) upto blinding level for ex
Sand Bedding for Irrigation Sub-Main Line Distribution Network (50,63,90 mm line) at Sound And Ligh
Single layer of 4mm thick modified bituminous waterproofing membrane for BOV,BOI-60 , C(9) and inf
Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 6) around Non potable water
Inspection and Compaction Test for backfilling Sub-grade 6th Layer (6 of 7) around MV Line Pit B/MV/2
' Warning Tape Installation of Foul Water Line for (160 mmØ - UPVC- Class 4) from (FW-A-3-7 to FW
Protection layer of 4mm thick bituminous protection board for pile cap ( PC-93 )and strip footing top s
' 300 mm Gravel 3/8" Backfilling and Geotextile of Foul Water Line for(160 mmØ - UPVC- Class 4) fr
Excavation & Bed Preparation for Low Current Lines (MH/PG/LC/06-17) and Fire Alarm & Security line
Surface preparation & Base primer coating for pile cap ( PC-93 )and strip footing top side axis 02-A to
' Warning Tape Installation in pipes OUT FALL-K for(Dia400mm Ø- UPVC Pipes-Class 4) for Storm Wate
' Gravel 3/8" Backfilling and Geotextile in pipes OUT FALL-K for (Dia400mm Ø- UPVC Pipes-Class 4) f
Protection layer of 4mm thick bituminous protection board FOR RAFT(3), W3,4,5,6,7 cafeteria building
"Surface Preparation prior to start backfilling beside the Fire&Security Line (To confine the sand cov
Surface Preparation prior to start backfilling beside the Telecommunications Line (To confine the sand
Stack Boulders Installed Layers at levels +875.90 & +876.30 & +876.700 , along Open Channel (Bounda
"Surface Preparation Prior to Start Backfilling for Storm Water Line Manhole MH-O-08-1, MH-O-09, M
Two coat of bituminous damp proofing coating FOR RAFT(3), W3,4,5,6,7 cafeteria building up to level
"Inspection of Excavation for Heating and Chilled Water Line Pit G/DC/03 at Zone-G - As highlighted "
Inspection of Blinding Concrete under Heating & Chilled Water Line Isolation Pit for G/DH/04, G/DH/05
Surface preparation & Base primer coating FOR RAFT(3), W3,4,5,6,7 cafeteria building up to level 863.4
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 1) above Red Tiles for MV Li
Surface preparation & Base primer coating FOR walls , W14 & W15 cafeteria building up to level 863.45
Excavation & Bed Preparation for Electrical Lines of Low Voltage (MH/PG/LV/06-12) and Emergency (
Protection layer of 4mm thick bituminous protection board FOR walls , W14 & W15 cafeteria building up
Sand Bedding for Water Feature Lines (Main 110 & 63 mm dia. HDPE) from Plant room to Outer Canopy
"Inspection of Excavation for MV Line Pulling Pit - L/MV/16, L/MV/05, L/MV/01 - as highlighted "
Surface Preparation prior to start backfilling around Potable Water Line Pit for C/PW/06 - as highlighted.
Single layer of 4mm thick modified bituminous waterproofing membrane for pile cap ( PC-93 )and strip
Inspection for application of Primer, 1st coat and 2nd coat for Footing and Column Neck of Seating Area
Inspection and compaction test 11th and 12th layer Backfill for MCPE 3 Inner wall Axis 03A to 02S (as
Inspection of Concrete Pouring for the Upstand of SBC-08 (Left Side) - As Highlighted
Sand Cover & Protection for Irrigation Sub-Main Line Distribution Network (50,110 mm line) East of
Inspection & Compaction Tests of 1st Layer Backfilling Subgrade (Out of 2 Layers Subgrade) for Wate
Stack Boulders Installed Layers at levels +877.200 , +877.600 & +878.100, along Open Channel (Bounda
Inspection & Compaction tests of 3rd (Final) Layer (Sub-Grade) Backfilling along Foundation of Bounda
Base Seal and Extrusion Aluminum Installation between Axis 01/L-01/M.
Base Seal and Extrusion Aluminum Installation between Axis 01/K-01/L.
Base Seal and Extrusion Aluminum Installation between Axis 01/J-01/K.
Inspection and compaction test 1st layer Backfill for Diaphragm wall Zone 2N (as highlighted) SP#125 (1s
Steel Reinforcements for abutment wall upto level 864.60 & 866.00 at CENTRAL BRIDGE zone 4 grid 01AL
Steel Reinforcements for ETFE PUMP ROOM Slab on Grade at axis 02-AN zone 2M (as highlighted) at
Level and Location for Energy Center foundation axis 7-11B, B (as highlighted) TOC 871.70
Surface Preparation and Base Primer Coating for Energy Center Side of Footing (inner foundation) (as hi
Protection layer of 4mm thick bituminous protection board for MCPE 2 Outer Wall from axis 02X to 03I
Concreting for ETFE PUMP ROOM mass concrete zone 2M (as highlighted) at CRESCENT
Concreting for Plain Concrete of Devonian Garden under Foundation at zone 2M (as highlighted)
Inspection of Installation and Alignment for the Crescent 01 Zone 1 - 1N, From Axis 01AM to 01AP
Concreting for Blinding under strip footing between PC( 128 & 130 )inner Zone 2F (as highlighted) KAI
Surface Preparation and Solvent Base Primer under Foundation of Retaining wall from axis 01B-02L (as
Protection layer of 4mm thick bituminous protection board under Foundation of Retaining wall from axi
Steel reinforcements for ETFE PUMP ROOM for SOG axis 02-AD zone 2J (as highlighted) at CRESCENT
Shuttering for ETFE PUMP ROOM for SOG axis 02-AD zone 2J (as highlighted) at CRESCENT
Concreting for ETFE PUMP ROOM for SOG axis 02-AD zone 2J (as highlighted) at CRESCENT
Level and Location for ETFE PUMP ROOM for SOG axis 02-AD zone 2J (as highlighted) at CRESCENT
Anti termitte for MCPE 1 duct tunnel Blinding under foundation at axis 03U, 03S, 03T, 03-1 to 02-2 Zone
Shuttering for MCPE 1 duct tunnel Blinding under foundation at axis 03U, 03S, 03T, 03-1 to 02-2 Zone 2
Level and Location for MCPE 1 duct tunnel Blinding under foundation at axis 03U, 03S, 03T, 03-1 to 02-
Steel Reinforcements for Beam of Energy Center Axis 18-28-R Level 875.5 (as highlighted)
Surface Preparation and Solvent Base Primer Coating for side of foundation of Diaphragm wall Axis 02R
Single layer of 4mm thick modified bituminous waterproofing membrane for side of foundation of Diap
Protection layer of 4mm thick bituminous protection board for side of foundation of Diaphragm wall Ax
Concreting for bottom slab of duct tunnel at MCPE 3 axis 03-D , 03-C , 03-B , 03-A Zone 2E 2F (as highl
Concreting of Mass Concrete (3rd layer) under Strip Footing Between PC 21-23-25 Zone 1D (as highlight
Concreting for Blinding of Strip Footing Between PC 143 - 145 Zone 2H (as highlighted)
Concreting for Strip Footing between PC 143-145 Zone 2H (as highlighted)
Concreting for mass concrete under strip footing (2nd layer) between PC( 21-23-25 )outer Zone 1D(as hi
Concreting of Mass Concrete (1st) under Strip Footing Between PC 21-23-25 Zone 1D (as highlighted)
Concreting for Strip Footing between grid 01L to 01K zone 1D (as highlighted) at CRESCENT
Concreting for mass concrete under strip footing (5th layer) between PC( 23-25 )outer Zone 1D(as highl
Concreting for mass concrete under strip footing (4th layer) between PC( 21-23-25 )outer Zone 1D(as hi
Concrete pouring for Blinding of Fountain (3 ) Inside Physic Garden, as per highlighted area in attach
Concrete Pouring for Blinding Under the Fountain at Geyser Garden, inside water Garden, as highligh
Surface Preparation and final Paint Touch Up Inspection for the Aviary Garden from Grid Line 01 to 2
Plaster Guide Points & Accessories for Plastering of all walls Inside Public Toilet # 3, At highlighted a
Excavation & Soil preparation prior to Boulders Along Boundary Wall (Inner side), at Discovery Garden
Sand Cover & Protection for Water Feature Lines (HDPE dia 110 mm) along the Pool, inside Butterfly G
Inspection & Compaction test for 1st Layer Subgrade (Out of 2 layers Subgrade) above Sub surface Pi
Excavation Under Blinding for Stone Edger inside water play Garden, at water Gardenas highlighted a
Coordinates & Top Level of Blinding Concrete for Stone Edger inside water play Garden, at water Gar
1st Coat Bituminous damp proofing for Footing & Kicker (Inner & Outer Sides) of Boundary wall Span
2nd Coat Bituminous damp proofing for Footing & Kicker (Inner & Outer Sides) of Boundary wall Span
2nd Coat Bituminous Damp Proofing for Footing & Kicker (Inner & outer faces) of Boundary Wall, Span
Inspection of Thrust Block for HDPE Water Feature pipes at Butterfly Garden, as highlighted area i
Installation of Main Fire Water Pipes (80&50mmØ-UPVC-Class-5) From Point (647503.695 East & 27
Inspection of Thrust Block for Fire Fighting Pipes at Butterfly Garden, as highlighted area in attac
Installation of EMT Conduit (Dia. 3/4, 1 inch.) and Box (Ceiling Mounted) for Lighting (E1,E1/CE & P
Installation of straight PVC conduit (Dia. 75mm) Low Voltage Ductbank (Power & Normal Ligh
Installation of Rock and Boulder in Wadi-03 (Left Side) - 4th layer (of 7)
Inspectionand Compaction Test for backfilling Sub-grade 1st Layer (1 of 3) above Sand Covering for Non
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 4) around MV Line Pit H/M
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 3) beside the Fire&Security L
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 3) beside the Telecommunicat
Inspection and Compaction test for backfilling Sub-grade 2nd Layer (2 of 3) above Red Tiles for MV L
"Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 6) for Non-Potable water lin
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 6) around MV Line Pit G/MV/
Inspection and Compaction Test for backfilling Sub-grade 4th Layer (4 of 6) around Non potable water
"Inspection and Compaction Test for backfilling Sub-grade 7th Layer (7 of 7) around MV Line Pit B/MV
Inspection of Excavation for Storm Water Line at Zone-2&3 including Manhole MH-O-11 and Gullies G-O-
Inspection of Excavation for Heating and Chilled Water Line at Zone-B including Pit G/DC/20, G/DH/21,
Inspection of Excavation for Non-Potable Water Line at Zone-B&G - as highlighted
Inspection of Excavation for RO Water Line at Area-A - As highlighted
Inspection of Excavation for Heating and Chilled Water Line at Zone-G including Pit F/DH/04, F/DC/05,
Excavation for Potable Water Line at Zone-B - as highlighted
Excavation for Fire Water Line at Zone-B&G - as highlighted
"Inspection for application of 1Coat Primer, Damp Proof (1st Coat & 2nd Coat) and Protection Board for
KAIG3-SD-SW-C-DP-1229-03, KAIG3-SD-SW-C-DP-7104-01, KAIG3-SD-GN-G-SU-4009-01
Surface Preparation prior to start backfilling for Footing and Column Neck of Seating Area (1) at Zone-G
Inspection and compaction test 9th layer for backfilling at MCPE 2 Zone 2H axis 02/AB to 02/AA (as high
Inspection and compaction test 1st & 2nd layer for Backfilling at Internal Building at zone 2A (as highl
Inspection and compaction test 15th layer Backfill at cafeteria W33 Axis 02D - 02E, Zone 2B (as highlig
Inspection and compaction test 9th layer Backfill for MCPE 2 Axis 02AB-02AD, Zone 2J (as highlighted) (
Single layer of 4mm thick modified bituminous waterproofing membrane for Buttresses BII,BIV-63 from
Surface preparation & Base primer coating for Buttresses BII,BIV-63 from level 863.00 up to level 865.
Protection layer of 4mm thick bituminous protection board for Buttresses BII,BIV-63 from level 863.00
Protection layer of 4mm thick bituminous protection board for BOV, BOI (61 ) and infill wall outer axis
Single layer of 4mm thick modified bituminous waterproofing membrane for BOV, BOI (61 ) and infill wa
Surface preparation & Base primer coating for BOV, BOI (61 ) and infill wall outer axis 02-C to 02-D (in
Protection layer of Geotex and 50mm Screed under RC foundation at MCPE1 Axis 03-1 to 03-2 Zone 2
Installation of EMT Conduit (Dia. 3/4) for Voice Data (Data,TV & Telephone) at Management and Mai
Installation of straight PVC conduit (dia.25mm) and Box for Security (CAM) at Crescent - 01 Infill Wall
Installation of straight PVC conduit (dia.25mm) and Box for Voice and DATA (WIFI & CAM) at Crescent -
Installation of UPVC conduit (4x110mm dia.) Low Current (TELECOM) Ductbank no.GG/D-TL/01 in betwe
Installation of UPVC conduit (2x110mm dia.) Low Current (Fire and Security) Ductbank no.GG/D-FS/01
Installation of EMT Conduit (Dia. 3/4) and Box for Fire Alarm (Speaker, Flashing Beacon, Break G
Inspection of Installation and Alignment for the Crescent 01 Zone 1 - 1M, From Axis 01AJ to 01AM.
Sand Cover & Protection for Irrigation (Main, Sub & Sleeves) lines (part 4) ( 50, 110, 160 & 200 mm),
Rough coat Prior to Plastering for All Internal walls (All Sides) Inside Public Toilet # 3, At highlighted
Installation of straight UPVC Conduit (Dia. 160mm) Medium Voltage Ductbank no. CC/D-MV/03 (from
Pre insulated Heat Water Pipes (S&R) 150mmØ( laying ,Aligment ,Leveling and fit up) From point (E
Concreting for Ring beam Zone 1P Axis 01-AQ to 01-AP, inner and outer (as highlighted), KAIG3-DOC
Level and Location for columns (C1,C2A,C2B,C3A,C3B)at south Small MOSQUE from level 873,15 up to lev
Inspection and compaction test 8th layer Backfill for MCPE 2 Axis 02AB-02AD, Zone 2J (as highlighted) (
Inspection and compaction test 8th layer for backfilling at MCPE 2 Zone 2H axis 02/AB to 02/AA (as high
Inspection and compaction test 1st & 2nd layer for Backfilling at MCPE 1 Zone 2N (as highlighted) axis
Inspection and compaction test 11th and 12th layer for Backfilling strip footing at CRESCENT between
Inspection and compaction test 3rd & 4th layer for Backfilling at Internal Building at zone 1N 1P (as hi
Surface preparation & Base primer coating for MCPE 2 walls and counterfort between axis (02/AD & 02/
Two layer of 4mm thick modified bituminous waterproofing membrane for MCPE 2 walls and counterfort
Inspection and compaction test 8th layer for backfilling PC between PC 80 to 79 Zone 1N (as highlighted
Protection layer of 4mm thick bituminous protection board for MCPE 2 walls and counterfort between
Stack Boulder Wall for Planting Bed Installed 2 Layers at Discovery GArden along Boundary Walll , At
Sand Cover and Protection for Water Feature Lines from Water play garden to Fountain of Geyser Gar
Excavation & Bed preparation for Water Feature Lines (Main 110 & 63 mm dia. HDPE) from Plant room
Coordinates & Top level of Blinding Concrete for the Fountain inside Geyser Garden at Water Garden
Inspection & Compaction tests of Single Layer (Sub-Base) Backfilling on Electrical Lines of Low Volta
Inspection & Compaction tests of Single Layer (Sub-Base) Backfilling on Low Current Lines of Fire Al
Coordinates and levels of blinding under Fountain 3 at Physic Garden as highlighted area in attached
Excavation & Bed Preparation for Irrigation Sub-Main Line Distribution Network (50,63,90 mm line) a
Stack Boulder Wall for Planting Bed Installed 2 Layers at Discovery Garden along Boundary Walll , At
Installation of Straight PVC Conduit (Dia. 25mm) and Boxes for Voice & Data (DATA & Telephone) at
Installation of UPVC conduit (2x110mm dia.) Low Current (Fire and Security) Ductbank no.CB/D-FS/0
Installation of UPVC conduit (2x110mm dia.) Low Current (TELECOM) Ductbank no.BB/D-TL/33 (bet. H
"Inspection for Blinding Concrete under Potable Water Line Pit for C/PW/01 at Zone-C - as highlighte
Pipe Sleeves Installation of Outer infill Wall Mechanical CHW (S&R) From Axis (02/2C to 02/D ) At C
Installation of UPVC Conduits (Dia. 110mm) for Voice & Data Ducts (ICT) at the Infill Wall in the P
Installation of UPVC Conduits (Dia. 110mm) for Fire Alarm Ducts (FS) at the Infill Wall in the Prom
Installation of straight UPVC Conduit (Dia. 160mm) Medium Voltage Ductbank no. DD/D-MV/15 (fr
Installation of straight UPVC Conduit (Dia. 160mm) Medium Voltage Ductbank no. DD/D-MV/12 (from
Installation of straight UPVC Conduit (Dia. 160mm) Medium Voltage Ductbank (from Manhole no. D/M
Inspection & Compaction tests of Single Layer (Sub-Base) Backfilling on Irrigation Sub-Main Line Dist
Inspection & Compaction tests of Single Layer (Sub-Base) Backfilling on Low Current Lines of Telecom
Inspection & Compaction tests of Single Layer (Sub-Base) Backfilling on Electrical Lines of Low volta
1st Coat Bituminous Damp Proofing for Footing & Kicker (Inner & outer faces) of Boundary Wall, Span
Mockup for Stone Cladding on Boundary wall (Outer Side) of Aviary Garden, Installed Location at Grid
Base Primer Coating prior to damp proofing for Footings (Inner Side) of Boundary Wall @ Grid (0-1/C-I
Surface Preparation prior to Waterpoofing for Footings (Inner Side) of Boundary Wall @ Grid (0-1/C-I)
Base Primer Coating prior to damp proofing for Footings & Garde Beams @ Grid (1-3/C-I), Inside Energ
Surface Preparation prior to Waterpoofing for Footings & Garde Beams @ Grid (1-3/C-I), Inside Energy
Concrete Pouring & Shuttering for Footings & Garde Beams @ Grid (B/7-11B & C/4-5), Inside Energy Ce
Steel Reinforcement for Footings & Garde Beams @ Grid (B/7-11B & C/4-5), Inside Energy Center 2, as
Stack Boulders Installed Layers at levels +873.60, 874.00, 874.40, 874.80, 875.20 & 875.60, along Op
Stack Boulders Installed Layers at levels +876.00, 876.50, 877.08, 877.45, 877.88, along Open Channe
"Surface Prepatio prior to start backfilling for Non-Potable water line Pit - NPW-ISC-16 NPW-ISC-18 and
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 3) beside the Fire&Security L
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 3) beside the Telecommunicat
Inspection of Sand bedding under pipe for Heating and Chilled Water Line at Zone-H- As highlighted (Sto
Inspection and Compaction test for backfilling Sub-grade 2nd Layer (2 of 3) above Sand Covering for RO
Inspection and Compaction test for backfilling Sub-grade 2nd Layer (2 of 3) above Sand Covering for N
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 1) above Red Tiles for MV Li
Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 5) upto blinding level for ex
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 6) around Non potable water
Inspection and Compaction Test for backfilling Sub-grade 5th Layer (5 of 7) around MV Line Pit B/MV/
Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 3) for MV Line from G/MV/14
Steel Reinforcements for Tunnel 1 wall & slab part-C (as Highlighted) Zone 2H 875.00
Steel Reinforcements for Strip Footing between PC 128-130 Zone 2F (as highlighted) (in reference to S
Steel Reinforcements for MCPE 3 WALL at axis 02R & 02S (as highlighted) Zone 2E & 2F level 874.80 & 8
Concreting for Infill wall between Axis 01Q-01R-01S (as highlighted) Zone 1F (2 walls only)
Shuttering for Infill Wall at Zone 2R TIP WALL upto 873.475 (as highlighted)
Shuttering for Plain Concrete of Devonian Garden under Foundation at zone 2M (as highlighted)
Anti Termite Application for Plain Concrete of Devonian Garden under Foundation at zone 2M (as highli
Steel Reinforcements for outer Infill wall between Axis 01F-01G (as highlighted) Zone 1B
Steel Reinforcements for outer Infill wall between Axis 02D-02E (as highlighted) Zone 2B
Steel Reinforcements for inner Infill wall at Axis 01F-01G (as highlighted) Zone 1B
Shuttering for Infill wall between Axis 01Q-01R-01S (as highlighted) Zone 1F (2 walls only)
Surface preparation & Base primer coating of ETFE Pump room at CRESCENT 870.71 (as highlighted)
Single layer of 4mm thick modified bituminous waterproofing membrane of ETFE Pump room at CRESCE
Protection layer of 4mm thick bituminous protection board of ETFE Pump room at CRESCENT 870.71 (a
Antitermite for ETFE PUMP ROOM under mass concrete zone 2M (as highlighted) at CRESCENT
Shuttering for ETFE PUMP ROOM mass concrete zone 2M (as highlighted) at CRESCENT
Shuttering for Column C78 for NORTH ADMINISTRATION BUILDING at Zone 2R (as highlighted) level 869
Concreting for Column C78 for NORTH ADMINISTRATION BUILDING at Zone 2R (as highlighted) level 869
Surface Preparation and Solvent Base Primer Coating for Infill wall at zone 1G, Axis 01S-01T (as highligh
Single layer of 4mm thick modified bituminous waterproofing membrane for Infill wall at zone 1G, Axis
Protection layer of 4mm thick bituminous protection board for Infill wall at zone 1G, Axis 01S-01T (as hi
Shuttering for 3rd layer Mass Concrete under Central Bridge Abutment foundation zone 4 (as highlighte
Concreting for 3rd layer Mass Concrete under Central Bridge Abutment foundation zone 4 (as highlighte
Steel Reinforcements for Infill wall between Axis 02H-02G (as highlighted) Zone 2C
Shuttering for Infill wall (2nd stage) between Axis 02R-02S (as highlighted) Zone 2F
Cocreting for Infill wall (2nd stage) between Axis 02R-02S (as highlighted) Zone 2F
Shuttering for RETAINING WALL Blinding under foundation at Axis 02J to 02K (as highlighted) Zone 6 & 7
Concreting for RETAINING WALL Blinding under foundation at Axis 02J to 02K (as highlighted) Zone 6 &
Surface Preparation Prior to start Backfilling at Internal Building at zone 2A (as highlighted) AXIS 02A - 0
Inspection and compaction test 14th layer Backfill at cafeteria W33 Axis 02D - 02E, Zone 2B (as highlig
Surface Preparation prior to Start backfilling Around MCPE 4 Axis 01AP ZONE 1P (as highlighted)
Inspection and compaction test 4th layer Backfilling in slope for Devonian Garden (as highlighted) Part A
Surface Preparation Prior to start Backfilling at Internal Building at zone 1N 1P (as highlighted) Beside
Level and Location for Excavation of RETAINING WALL at Axis 02J to 02K (as highlighted) Zone 6 & 7
Level and Location for internal foundation (walls & coumns ) of NORTH ADMINSTRATION between axis
Level and Location for Plain Concrete of Devonian Garden under Foundation at zone 2M (as highlighted)
Level and Location for Infill Wall at Zone 2R TIP WALL upto 873.475 (as highlighted)
Level and Location for Infill wall between Axis 01Q-01R-01S (as highlighted) Zone 1F (2 walls only)
Level and Location for ETFE PUMP ROOM mass concrete zone 2M (as highlighted) at CRESCENT
Level, Location of 3rd layer Mass Concrete under Central Bridge Abutment foundation zone 4 (as highlig
Level and Location for Infill wall (2nd stage) between Axis 02R-02S (as highlighted) Zone 2F
Level and Location for RETAINING WALL Blinding under foundation at Axis 02J to 02K (as highlighted) Zo
Bolt Tightening Inspection of Management Building from Grid Line E-F-G/03 to 06, P-Q-R/ 03 to 06.
Surface Preparation and Paint Touch Up Inspection of Management Building from Grid Line E-F-G/ 03
Pipe Sleeves Installation of Outer infill Wall Mechanical CHW (S&R) From Axis (02/2G to 02/H ) At C
' Warning Tape Installation in pipes OUT FALL-K for (110 mm Ø- UPVC Pipes-Class 4 ) for Storm Water
' Gravel 3/8" Backfilling and Geotextile in pipes OUT FALL-K for (110 mm Ø- UPVC Pipes-Class 4 ) for
Surface Preparation (Curing) prior to start waterproofing for Footing and Column Neck of Seating Area (
Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 14) around foul water line m
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 6) around Non potable water
Pipe Installation of Water Features pipes; (63mm SDR11-PE100) at Water Garden (Gyser Garden); A
Inspection of Concrete Pouring for the Footing and Walls of SBC-07 - Wing Wall - As Highlighted
Inspection of Formwork for the Footing and Walls of SBC-07 - Wing Wall - As Highlighted
Inspection of Steel Reinforcement for the Footing and Walls of SBC-07 - Wing Wall (Left Side) - As Highl
Inspection and Compaction Test for backfilling Sub-grade 4th Layer (4 of 7) around MV Line Pit B/MV/
Inspection and Compaction Test for backfilling Sub-grade 2nd layer ( 2 of 2 ) for the Duct Bank of Fire
"Inspection and Compaction Test for backfilling Sub-grade 2nd layer (2 of 2) for the Duct Bank of Tel
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 3) for MV Line from G/MV/14
Installation of Rock and Boulder in Wadi-03 (Right Side) - 4th layer (4 of 7)
Installation of UPVC Conduit (Dia. 110mm) Low Voltage Ducts (Submain Cables) in ETFE room at Cr
Installation of UPVC Conduit (Dia. 110mm) Low Voltage Ducts (Submain Cables) in ETFE room at Cre
Installation of UPVC Conduit (Dia. 110mm) Low Voltage Ducts (Submain Cables) in ETFE room at Cre
Inspection and compaction test 13th layer Backfill at cafeteria W33 Axis 02D - 02E, Zone 2B (as highlig
Steel Reinforcements for internal columns and wall of NORTH ADMINSTRATION axis 02/BC, 02/1-02/2
Steel Reeinforcements for RC concrete ETFE PUMP ROOM S.O.G.. zone 2D axis 02-J inner line (as hig
Inspection and compaction test 4th and 5th layer for Backfilling inside Cafeteria building( Second Part)
Inspection and compaction test 9th and 10th layer for Backfilling strip footing at CRESCENT between P
Inspection and compaction test 7th layer Backfill for MCPE 2 Axis 02AB-02AD, Zone 2J (as highlighted) (
Inspection and compaction test 1st & 2nd layer for Backfilling at Internal Building at zone 1N 1P (as h
Steel Reinforcements for (WALLS) (W28,W29,W30,W31,W32)level 869.10 & (ELEVATER) level 867.80 at
Installation of Straight PVC Conduit (Dia. 25mm) and Boxes for Security (Door Release, Card Reader,
Installation of Straight PVC Conduit (Dia. 25mm) and Boxes for Voice & Data (DATA & Telephone) at
Installation of EMT Conduit (Dia. 3/4) and Box for Fire Alarm (Speaker, Voice Alarm, Flashing Beac
Installation of EMT Conduit (Dia. 3/4 inch) and Boxes for Voice and Data (Data & WIFI) at the Mana
Installation of straight UPVC Conduit (Dia. 160mm) Medium Voltage Ductbank no. DD/D-MV/12 (fro
Installation of straight UPVC Conduit (Dia. 160mm) Medium Voltage Ductbank no. DD/D-MV/29 (fro
Installation of straight EMT Conduit (Dia. 3/4 inch) & Boxes (Ceiling Mounted) for Power (Twin Swit
Installation of straight EMT Conduit (Dia. 3/4 inch) & Boxes (Ceiling Mounted) for LIghting System
Inspection of Alignment for the remaining Installed Baseplates in Crescent 01 Zone 1 - 1K From Axis
Inspection of Alignment for the remaining Installed Baseplates in Crescent 01 Zone 2 - 1H From Axis 0
Inspection of Installation and Alignment for the Crescent 01 Zone 1 - 1L, From Axis 01AG to 01AJ.
Bolt Tightening Inspection of Crescent 01, Zone 1 - 1J & 1K from Axis 01AA to 01AG.
Inspection and compaction test 9th and 10th layers for backfilling for ETFE Pump room axis 02/AD - 02/
Shuttering for Infill wall (outer) between axis 02/AY to 02/AX (as highlighted) Zone 2Q
"Inspection for Blinding Concrete under MV Line Pit - D/MV/18 at Zone-D (As Highlighted) "
Inspection for Casting the Concrete encasement and Surface Preperation prior to start waterproofing
Inspection of Sand Covering to protect the pipe for RO Water Line at Zone-L - as highlighted in the att
Inspection of Sand Covering to protect the pipe for Non-Potable Water Line at Zone-L - as highlighted i
Inspection and Compaction Test for Backfilling Sub-base 1st Layer (1 of 1) under 3rd lift of Rock for Bou
Surface Preparation prior to start backfilling around MV Line Pit H/MV/03, H/MV/13, H/MV/19 and H/M
Surface Preparation prior to start backfilling around MV Line Pit H/MV/02, H/MV/05, H/MV/10 and H/M
"Inspection for Installation of Non-Potable Water Line Pit - NPW-ISC-16, NPW-ISC-18 - as highlighted"
Inspection of Excavation for Heating and Chilled Water Line at Zone-H- As highlighted
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 5) upto blinding level for ex
Inspection and Compaction Test for backfilling Sub-grade 1st Layer ( 1 of 5) upto blinding level for e
"Surface Preparation prior to start backfilling beside the Fire&Security Line (To confine the sand cov
Surface Preparation prior to start backfilling beside the Telecommunications Line (To confine the san
Surface Preparation prior to start backfilling around Non potable water line-Manhole POC-27 and POC28
Inspection of Concrete Pouring for footing of MV Line Pulling Pit - D/MV/17 at Zone- D (As Highlighted)
Level and Location for Retaining Wall at Grid 01/C to 01/A Zone 6 & 7 at CRESCENT (as highlighted)
Inspection of Formwork for footing of MV Line Pulling Pit - D/MV/17 at Zone- D (As Highlighted)
Concreting for Retaining Wall at Grid 01/C to 01/A Zone 6 & 7 at CRESCENT (as highlighted)
"Inspection and Compaction Test for backfilling sub-grade 1st Layer ( 1 of 8 ) for storm water Line be
Shuttering for Retaining Wall at Grid 01/C to 01/A Zone 6 & 7 at CRESCENT (as highlighted)
Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 7) around MV Line Pit B/MV/
Inspection and Compaction Test for backfilling Sub-grade 1st layer ( 1 of 2 ) for the Duct Bank of Fire
Protection layer of 4mm thick bituminous protection board for RC Strip footing between PC 1-3-5, 2-4-6
Concreting for RING BEAM Zone 1K (OUTER) Axis 01-AG to 01-AF(as highlighted)
"Inspection and Compaction Test for backfilling Sub-grade 1st layer (1 of 2) for the Duct Bank of Tele
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 3) for MV Line from G/MV/14
Inspection of Concrete Pouring for footing of MV Line Pulling Pit - D/MV/03, D/MV/08, D/MV/33 and D/
Inspection of Formwork for footing of MV Line Pulling Pit - D/MV/03, D/MV/08, D/MV/33 and D/MV/31 a
Concerting for Infill inner wall at Crescent between axis (02-H & 02-G) (As highlighted) ZONE 2C
Steel Reinforcements for MCPE 3 WALL at axis 03A & 03B (as highlighted) Zone 2E & 2F level 874.80
Concreting for Infill wall inner at Crescent between axis (01-S & 01-R) (for 2 walls only) (As highlighte
Level and Locaion for Infill wall inner at Crescent at axis 02O & 02P buttress BII BIV 77 & 78 (As highli
Concreting for Infill wall inner at Crescent at axis 02O & 02P buttress BII BIV 77 & 78 (As highlighted)
Shuttering for Infill wall inner at Crescent at axis 02O & 02P buttress BII BIV 77 & 78 (As highlighted) Z
Stack Boulders Installed Layers at levels +876.00, 876.40, 876.80, 877.40, 877.80 & 878.20, along Op
Stack Boulders Installed Layers at levels +873.60, 874.00, 874.40, 874.80, 875.20 & 875.60, along Op
Excavation & Soil Preparation for Open Channel 1, (Wadi # 1), Inside Water Garden, At Highlighted a
Coordinates & Levels for Footings & Garde Beams @ Grid (13-15/D-H), Inside Energy Center 2, as high
Base Primer Coating prior to damp proofing for Footing & Kicker (Inner & outer faces) of Boundary Wa
Base Primer Coating prior to damp proofing for Footing & Kicker (Inner & Outer Sides) of Boundary w
Concrete Pouring & Shuttering for Footings & Garde Beams @ Grid (13-15/D-H), Inside Energy Center 2
Steel Reinforcement for Footings & Garde Beams @ Grid (13-15/D-H), Inside Energy Center 2, as highl
Inspection and compaction test 7th layer for backfilling PC between PC 80 to 79 Zone 1N (as highlighted
Steel Reinforcement for Columns (2nd lift, above the level +872.35) of Boundary Wall @ Grid (M/22-28
Inspection and compaction test 13th layer for backfilling of MCPE 1 axis 02/AN to 02/AP (as highlighte
Inspection and compaction test 12th layer Backfill at cafeteria W33 Axis 02D - 02E, Zone 2B (as highlig
Shuttering for ETFE PUMP ROOM for blinding under SOG axis 02-AD zone 2J INNER (as highlighted) a
Level and Location for ETFE PUMP ROOM for blinding under SOG axis 02-AD zone 2J INNER (as highli
Antitermite for ETFE PUMP ROOM for blinding under SOG axis 02-AD zone 2J INNER (as highlighted)
Protection layer of 4mm thick bituminous protection board FOR RAFT(3), W19 cafeteria building up to
Two coat of bituminous damp proofing coating FOR RAFT(3), W19 cafeteria building up to level 863.45
Surface preparation & Base primer coating RAFT(3), W19 cafeteria building up to level 863.45 (as hig
Starter bar and Shear connecter for shell beam of Ring beam Zone 1P Axis 01-AQ to 01-AP (as highl
Shuttering and Scaffoldings for Ring beam Zone 1P Axis 01-AQ to 01-AP (as highlighted), KAIG3-DOC-
Level and Location for Ring beam Zone 1P Axis 01-AQ to 01-AP (as highlighted), KAIG3-DOC-CO-S-0423
'Warning Tape Pipe InstallationFor Irrigation ROW mainline Including Branches; (200mmØ- UPVC-Claa
'Warning Tape Pipe Installation For Irrigation ROW Submain Line Including Branches; (50&110 &16
'Warning Tape Pipe Installation For Non-Potable Water (Irrigation Main Line); (200 mmØ- UPVC-Claas
Pre insulated Chilled Water Pipes (S&R) 200mmØ( laying ,Aligment ,Leveling and fit up) From point
Installation of Straight PVC Conduit (Dia. 25mm) and Boxes for Security (CAM) in the Crescent-02 at
Installation of Straight PVC Conduit (Dia. 25mm) and Boxes for Voice Data (WIFI & CAM) in the Cresce
Single layer of 4mm thick modified bituminous waterproofing membrane for infill wall inner and BIV(60
Protection layer of 4mm thick bituminous protection board for infill wall inner and BIV(60,61,62) & BII
Surface preparation & Base primer coating for walls (W8, W9, W12, W13, W21) at CRESCENT up to level
Protection layer of 4mm thick bituminous protection board for walls (W8, W9, W12, W13, W21) at CRES
Two layer of 4mm thick modified bituminous waterproofing membrane for walls (W8, W9, W12, W13, W2
Surface preparation & Base primer coating for infill wall inner and BIV(60,61,62) & BII (60,61 ) from
Level and Location for walls ( W4, W5, W6, W7) at CAFETERIA from level 862.00 to 863.55 zone 2A (as h
Concreting for walls ( W4, W5, W6, W7) at CAFETERIA zone 2A from level 862.00 to 863.55 (as highlight
Level and Location for walls (W22 ,W23, W24, W25, W26, W27) at CAFETERIA from level 863.00 to level
Shuttering for walls ( W4, W5, W6, W7) at CAFETERIA zone 2A from level 862.00 to 863.55(as highlighte
Concreting for walls (W22 ,W23, W24, W25, W26, W27) at CAFETERIA from level 863.00 to level l 868.30
Shuttering for walls (W22 ,W23, W24, W25, W26, W27) at CAFETERIA from level 863.00 to levell 868.30
Concretring for RC Strip Footing pc 152 to pc 158 zone 2K (as highlighted)
Level and Location for ETFE PUMP ROOM mass concrete zone 1D up to level 868.95 (as highlighted) at
Antitermite for ETFE PUMP ROOM under mass concrete zone 1D (as highlighted) at CRESCENT
Shuttering for ETFE PUMP ROOM mass concrete zone 1D up to level 868.95 (as highlighted) at CRESCEN
Steel Reinforcements for Infill wall TIP axis (02/BC - 02/1 , 02/2) (as highlighted) Zone 2R at CRESCENT
Concreting for Infill wall between axis 02/AO to 02/AN (as highlighted), at CRESCENT Zone 2M
Concreting for Infill inner wall between axis 01-J to 01-I (as highlighted), at CRESCENT Zone 1C (1st Stag
Inspection and compaction test 1st layer Backfilling above the Chid Care footing between (as Highligh
Inspection and compaction test 7th and 8th layer for Backfilling strip footing at CRESCENT between PC
Inspection and compaction test 2nd and 3rd layer for Backfilling inside Cafeteria building( Second Part
Inspection and compaction test 11th layer Backfill at cafeteria W33 Axis 02D - 02E, Zone 2B (as highlig
Inspection and compaction test 6th layer Backfill for MCPE 2 Axis 02AB-02AD, Zone 2J (as highlighted) (
Installation of straight PVC conduit (Dia. 75mm) Low Voltage Ductbank (Emergency Lighting) and c
Installation of straight PVC conduit (Dia. 75mm) Low Voltage Ductbank (Normal Lighting) and conne
Installation of PVC conduit ( dia.75mm ) Low Current Ductbank (Fire and Security) MH/WG/FA/2
Inspection for Laying of Red Tiles above the pipe for MV Line from H/MV/28 to H/MV/13 at Zone-H - as
"INSPECTION FOR INSTALLATION OF SLAB FOR H/MV/25 AND H/MV/02 (As Highlighted)"
Surface Preparation prior to start backfilling for the Duct Bank of Fire & Security Distribution Line fro
Surface Preparation prior to start backfilling for the Duct Bank of Telecommunications Line from B/TL/3
Surface Preparation prior to start backfilling for MV Line from G/MV/14 to G/MV/24 at Zone-G (As Highl
Inspection and Compaction test for backfilling Sub-grade 1st Layer ( 1 of 3) above Sand Covering for R
Inspection and Compaction test for backfilling Sub-grade 1st Layer ( 1 of 3) above Sand Covering for N
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 14) around foul water line m
Inspection of Steel Reinforcement for the Footing and Walls of SBC-07 - Wing Wall (Right Side) - As High
Inspection and Compaction Test for Backfilling Subgrade 1st Layer (1 of 1) under 3rd lift of Rock for Bou
Base Seal and Extrusion Aluminum Installation between Axis 01/I-01/J.
Base Seal and Extrusion Aluminum Installation between Axis 01/G-01/H.
Inspection and Compaction Test for Backfilling Subgrade 5th Layer (5 of 5) under 2nd lift of Rock for Bou
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 7) around MV Line Pit B/MV
Inspection and Compaction Test for backfilling Sub-grade 5th Layer (5 of 6) around MV Line Pit G/MV/28
Inspection of Concrete Pouring for Wall of MV Line Pulling Pit - E/MV/02, E/MV/05, D/MV/04, D/MV/3
Installation of straight EMT Conduit (Dia. 3/4 inch) & Boxes (Ceiling Mounted) for LIghting Syste
Inspection of Formwork for Wall of MV Line Pulling Pit - E/MV/02, E/MV/05, D/MV/04, D/MV/32 and D
Pre insulated Chilled Water Pipes (S&R) 200mmØ( laying ,Aligment ,Leveling and fit up) From point
Pipe Installation of Water Features pipes; (200&110&65mm) Under Blinding Concrete of Geyser Foun
Sand Bedding for Water Feature Lines (HDPE dia 63 mm) from Water play garden to Fountain of Geyse
Warning Tape for Low Current Lines of Telecom and Fire Alarm & Security Lines, Inside Discovery Gar
Warning Tape for Electrical Lines of Low voltage Lines & Emergency Lines, Inside Discovery Garden at
Excavation & Bed Preparation for Low Current Lines (MH/PG/LC/13-17) and Fire Alarm & Security line
Excavation & Bed Preparation for Electrical Lines of Low Voltage (MH/PG/LV/09-12) and Emergency (
Stack Boulders Installed Layers at levels +876.00, 876.40 & 876.80, along Open Channel (Boundary wal
Concrete Pouring & Shuttering for Columns (2nd lift, above the level +872.35) of Boundary Wall @ Gri
Coordinates & Levels for Columns (2nd lift, above the level +872.35) of Boundary Wall @ Grid (M/17-2
Surface Preparation Prior to start Backfilling at MCPE 1 Zone 2N (as highlighted) axis 03V
Surface Preparation Prior to start Backfilling at Diaphragm wall Zone 2N (as highlighted) axis 02AR
Inspection and compaction test 1st layer Backfilling in slope for Devonian Garden (as highlighted) Part A
Inspection and compaction test 3rd layer Backfilling in slope for Devonian Garden (as highlighted) Part A
Concreting for MCPE 1 Suspended slab at axis 03S-03T TOC: 875.974 - 875.85 (as highlighted)
Shuttering for MCPE 1 Suspended slab at axis 03S-03T TOC: 875.974 - 875.85 (as highlighted)
Steel Reinforcements for MCPE 1 Suspended slab at axis 03S-03T TOC: 875.974 - 875.85 (as highlighted)
Final Inspection for the Crescent 02, Zone 5 - 2H & 2G from Axis 02AB to 02V.
Level and Location for MCPE 1 Suspended slab at axis 03S-03T TOC: 875.974 - 875.85 (as highlighted)
Level and Location for Infill wall at Zone 1C, between Axis 02-2, 01H - 01I (outer) (as highlighted)
Inspection and Compaction Test for Backfilling Sub-base 1st Layer (1 of 1) under 4th lift of Rock for Boul
Inspection of Sand bedding under pipe for Heating and Chilled Water Line at Zone-G&K - As highlighted
Inspection and Compaction Test for backfilling Sub-grade 1st Layer ( 1 of 14) around foul water line
"Inspection for Blinding Concrete under MV Line Pit - E/MV/02, E/MV/05, D/MV/04, D/MV/32, D/MV
Inspection of Steel Reinforcement for Footing and wall of MV Line Pit - E/MV/02, E/MV/05, E/MV
Inspection of Concrete Pouring for Slab of MV Line Pulling Pit - G/MV/08, G/MV/09, G/MV/34, G/MV/3
Inspection of Formwork for Slab of MV Line Pulling Pit - G/MV/08, G/MV/09, G/MV/34, G/MV/35 and G/
"Inspection of Concrete Pouring for the Wall and Slab of SBC-07 (Right Side) - As Highlighted"
Inspection of Sand Covering Layer for Protection of MV Line from (H/MV/28 to H/MV/13) at Zone-H as hi
Inspection of Formwork for the Wall and Slab of SBC-07 (Right Side) - As Highlighted
Inspection of Excavation for Heating and Chilled Water Line at Zone-G&K including Pit K/DC/02, K/DC/0
Surface Preparation prior to start backfilling for Telecommunication Line Pit K/TL/10, K/TL/15, K/TL/19
Surface Preparation prior to start backfilling Fire&Security Line Pit K/FS/04, K/FS/09, K/FS/05 and K/FS
Concreting for internal foundation (walls & coumns ) of NORTH ADMINSTRATION between axis 02/BA to
Installation of straight PVC conduit (dia,32mm) and Box for Lighting (Scene Switch) at Crescent-02 Sou
Installation of EMT Conduit (Dia. 3/4) and Box for Voice Data (CAM, WIFI & Telephone) at Managemen
Installation of straight PVC conduit (dia.25mm) and Box for Fire Alarm (Flashing Beacon) at Crescent -
Installation of straight PVC conduit (dia.25mm) and Box for Fire Alarm (Speaker) at Crescent - 01 Infil
Inspection & Compaction tests of Single Layer (Sub-Base) Backfilling on Low Current Lines of Telec
Inspection & Compaction tests of Single Layer (Sub-Base) Backfilling on Electrical Lines of Low Vol
Inspection & Compaction tests of 2nd Layer (Sub-Grade) Backfilling (Out of 4 layers) along Foundation
Sand Bedding for Irrigation Line (90 mm dia) from Plant room to exit way from Outer side, at Maze ga
Sand Cover & Protection for Water Feature Lines (HDPE dia 250 & 200 mm) from Water play garden to
Sand Bedding for Fire Fighting Lines (Pipe dia 50 & 80 mm) from FHC to End of Tunnel, inside Butterfl
Concreting for Central Bridge Abutment Foundation (as highlighted) Zone 4 Grid 02AG - 02AH
200mm Protection 3/4" Gravel for Devonian garden (as Highlighted) Zone 2M
Final Inspection for the Crescent 02, Zone 6 - 2F from Axis (02V to 02R).
Pre insulated Chilled Water Pipes (S&R) 65mmØ( laying ,Aligment ,Leveling and fit up) From point (
Inspection and compaction test 2nd layer Backfilling above the Chid Care footing between (as Highlig
Pre insulated Chilled Water Pipes (S&R) 200mmØ( laying ,Aligment ,Leveling and fit up) From point
Inspection and compaction test 5th and 6th layer for Backfilling strip footing at CRESCENT between PC
Inspection and compaction test 12th layer for Backfilling at MCPE 2 wall inner axis AA-E (as highlight
Installation of UPVC conduit (4x110mm dia.) Low Current (TELECOM) Ductbank no. FG/D-TL/03 (SW) (i
Inspection and compaction test 5th layer for Backfilling inside Cafeteria building btween Axis 02A - 02D
Inspection and compaction test 2nd layer Backfilling in slope for Devonian Garden (as highlighted) Part
Inspection and compaction test 1st layer for Backfilling inside Cafeteria building( Second Part) btween A
Protection layer of 4mm thick bituminous protection board for Strip Footing between PC 16-18 (as high
Installation of Main Fire Water Pipes (250mmØ-UPVC-Class-5) From Point (647567.518 East & 271390
Concreting for Infill wall at Zone 1C, between Axis 02-2, 01H - 01I (outer) (as highlighted)
'Warning Tape Pipe Installation For Irrigation ROW Submain Line Including Branches (110mmØ & 50
Steel Reinforcements for Infill wall at Zone 2F, between Axis 02-1, 02R - 02S (inner) (as highlighted)
Steel Reinforcements for Infill wall between Axis 01P-01R (as highlighted) Zone 1F
Anti Termite Application for Grade Beam of Child care (as highlighted) Zone 2N
Level and Location for Grade Beam of Child care (as highlighted) Zone 2N
Preliminary Inspection of Erected Steel in Crescent 01, Zone 1 1M & 1M from Axis 01AJ to 01AP as pe
Shuttering for Infill wall at Zone 1C, between Axis 02-2, 01H - 01I (outer) (as highlighted)
Steel Reinforcements for Beam between Axis 02O - 02P (as highlighted) Zone 2E
Steel Reinforcements for Infill wall (stiffiner) on Axis 02Q (as highlighted) Zone 2E
Steel Reinforcements for RING BEAM Zone 1P (OUTER) Axis 01-2, 01AP to 01AQ (as highlighted)
Installation and Fixation of Anchor Bolts and Check Coordinates & Level for Pergola at Grid (E-G/3-6
Inspection & Compaction tests of 1st Layer (Sub-Grade) Backfilling (Out of 4 layers) along Foundation
Coordinates & Levels for Footings of Boundary Wall @ Grid (A-C/0-6), at Energy Center 2, as highlight
Concrete Pouring & Shuttering for Footings of Boundary Wall @ Grid (A-C/0-6), at Energy Center 2, as
Steel Reinforcement for Footings of Boundary Wall @ Grid (A-C/0-6), at Energy Center 2, as highlight
Inspection and compaction test 3rd &4th layer for Backfilling around PC 25 Zone 2E (as highlighted) a
Pipe Installation of Sub-Surface Drainage (Main Line & Branches) Pipes; (110 mmØ, UPVC-CLASS-4) A
HDPE Pipe Installation of Water Features pipes Under Blinding Concrete of Fountian ; (160&90mmØ
' Showers (Box,Supply,Copper Pipes including insulation) , Installation At Management Building As
HDPE Pipe Installation of Water Features pipes; (110&63&50mmØ SDR11-PE100); As per High lighte
Installation of Rock and Boulder in Wadi-03 (Left Side) - 3rd layer (3 of 7)
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 3) for Storm Water Line from
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 7) around MV Line Pit B/MV/
"Inspection of Excavation for Non-Potable Water Line Isolation Pit - POC- 44 at Zone-K - as highlighted "
Inspection and Compaction Test for backfilling Sub-grade 4th Layer (4 of 6) around MV Line Pit G/MV/28
Inspection for Blinding Concrete under Non-Potable Water Line Isolation Pit for NPW-ISC-14, NPW-ISC
Inspection of Sand bedding under pipe for MV Line from D/MV/36 to E/MV/02 and D/MV/09 to E/MV/05 -
Inspection of Sand bedding under pipe for MV Line from D/MV/03 to D/MV/36 and D/MV/08 to D/MV/09 -
Inspection and Compaction Test for Backfilling Subgrade 4th Layer (4 of 5) under 2nd lift of Rock for Bou
Inspection and Compaction Test for Backfilling Subgrade 1st Layer (1 of 1) under 4th lift of Rock for Boul
"INSPECTION FOR INSTALLATION OF STORM WATER LINE GULLIES G-G-26, G-G-27 - as highlighted "
"Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 4) for the Duct Bank of MV
Inspection Of Pipe Installation For Irrigation ROW mainline Including Branches; (200mmØ- UPVC-Claa
Inspection Of Pipe Installation For Non-Potable Water (Irrigation Main Line); (40 mmØ- UPVC-Claas-5
Inspection Of Pipe Installation For Non-Potable Water (Irrigation Main Line); (200 mmØ- UPVC-Claas-
Level and Location for internal wall of NORTH ADMINSTRATION building at CRESCENT along axis 02/BB u
Shuttering for internal wall of NORTH ADMINSTRATION building at CRESCENT along axis 02/BB up to bot
Surface preparation & Base primer coating of ETFE Pump room at CRESCENT up to level 869.20 (as hig
Single layer of 4mm thick modified bituminous waterproofing membrane for ETFE Pump room at CRESCEN
Protection layer of 4mm thick bituminous protection board for MCPE 2 walls and counterfort between ax
Surface preparation & Base primer coating for MCPE 2 walls and counterfort between axis (03/L & 02/AG
Two layer of 4mm thick modified bituminous waterproofing membrane for MCPE 2 walls and counterfor
Protection layer of 4mm thick bituminous protection board for ETFE Pump room at CRESCENT up to leve
Geotextile and Screed under foundation for MCPE 3 at Axis 02P, 03-1, 03-2 (as highlighted)
Concreting for MCPE 3 blinding under ground foundation at axis 02-P, 03-2 to 03-1 , LEVEL 870.35 Zo
Steel Reinforcements for RING BEAM Zone 1K (OUTER) Axis 01-AG to 01-AF(as highlighted),at CRESCEN
Two layer of modified bituminous waterproofing membrane under foundation for MCPE 3 at Axis 02P, 03
Level and Location for internal Columns and walls of NORTH ADMINSTRATION building at CRESCENT betw
Shuttering for internal Columns and walls of NORTH ADMINSTRATION building at CRESCENT between axi
Level and Location for bottom slab of duct tunnel at MCPE 3 axis 03-D , 03-C , 03-B , 03-A Zone 2E 2F
Shuttering for bottom slab of duct tunnel at MCPE 3 axis 03-D , 03-C , 03-B , 03-A Zone 2E 2F (as highl
Level and Location for Excavation for Diaphragm wall at CRESCENT Zone 1 axis 01AM (as highlighted)
Level and Location for ETFE PUMP ROOM Slab on Grade at axis 02-AR zone 1N (as highlighted) at CRES
Steel Reinforcements for internal walls & coumnS of NORTH ADMINSTRATION at CRESCENT between ax
Substrait Sand Bedding for Hot Water (Supply and Return) pipes and CHW (Supply and Return) pipes at M
Level and Locaion for Infill wall inner at Crescent between axis (01-S & 01-R) (for 2 walls only) (As hi
Inspection and compaction test 10th layer Backfill at cafeteria W33 Axis 02D - 02E, Zone 2B (as highlig
Concrete Pouring & Shuttering for Columns of Boundary Wall @ Grid (J-L/0-4 & L/4-6), at Energy Cente
Coordinates & Levels for Columns of Boundary Wall @ Grid (J-L/0-4 & L/4-6), at Energy Center 2, as h
Stack Boulders Installed Layers at levels +875.20 & +875.60, along Open Channel (Boundary wall Side)
Excavation for Tree Pits (15 no's) Along Boundary Wall (Inner side), inside Butterfly Garden, as highli
Marking & Check for coordinates of Tree Pits (15 no's) Along Boundary Wall (Inner side), inside Butter
Excavation & Soil preparation prior to Boulders Along Boundary Wall (Inner side), at Discovery Garden
Inspection & Compaction tests of Single Layer (Sub-Base) Backfilling on Irrigation Sub-Main Line Dist
Inspection & Compaction tests of Single Layer (Sub-Base) Backfilling on Low Current Lines of Telecom
Inspection & Compaction tests of Single Layer (Sub-Base) Backfilling on Electrical Lines of Low volta
Excavation and Bed preparation for Fire Fighting Lines (Pipe dia 50 & 80 mm) from FHC to End of Tunne
Installation of PVC Conduit Sleeves Passing the Concrete (3x75mm) for Low Voltage (Power System) at
Installation of Rock and Boulder in Wadi-03 (Right Side) - 3rd layer (3 of 7)
"Inspection of Excavation for Non-Potable Water Line at Zone-G&K includig Pit POC-46 - as highlighted "
Surface Preparation prior to start backfilling around MV Line Pit B/MV/23 and G/MV/21 at Zone-G (As H
Inspection of Concrete Pouring for Slab of MV Line Pulling Pit - C/MV/25, C/MV/22, C/MV/38, C/MV/0
Inspection of Formwork for Slab of MV Line Pulling Pit - C/MV/25, C/MV/22, C/MV/38, C/MV/08, G/MV/
Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 6) around MV Line Pit G/MV/28
Inspection and Compaction Test for backfilling Sub-grade 5th Layer (5 of 7) around MV Line Pit G/MV/
Inspection of Excavation for Heating and Chilled Water Line at Zone-G&K including Pit K/DC/02, K/DC/0
Inspection of Excavation for Heating and Chilled Water Line at Zone-B - As highlighted
Inspection of Excavation for RO Water Line at Zone-B,G,K&L - As highlighted
Excavation for Potable Water Line at Zone-B - as highlighted
Excavation for Fire Water Line at Zone-B - as highlighted
Inspection for Installation of Non-Potable Water Line Pit - POC-27, POC-28, POC-30 - as highlighted
Inspection and Compaction Test for Backfilling Subgrade 3rd Layer (3 of 3) under 2nd lift of Rock for Bou
Surface Preparation prior to start Waterproofing for SBC-08 (Left Side)- Footing and wall of Wing Wall -
Inspection of Sand bedding under pipe for MV Line from D/MV/18 to D/MV/03 and D/MV/19 to D/MV/08 -
Inspection of Formwork for the Upstand of SBC-08 (Left Side) - As Highlighted
"Inspection of Steel Reinforcement for the Upstand of SBC-08 (Left Side) As Highlighted"
Inspection of Steel Reinforcement for the Top Slab of SBC-07 - (Right Side) - As Highlighted
Inspection of Steel Reinforcement for Slab of MV Line Pulling Pit - G/MV/08, G/MV/09, G/MV/34, G/M
INSPECTION FOR INSTALLATION OF SLAB FOR B/MV/07 , B/MV/12 , B/MV/09 AND B/MV/18 (As Highligh
Inspection for casting concrete for short piece and Surface Preperation prior to start waterproofing f
Inspection of Excavation for Non-Potable Water Line Isolation Pit - POC-NPW/FC at Zone-B - as highlight
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 4) for the Duct Bank of MV
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 3) for Storm Water Line from
"Inspection for Installation of MV Line Junction Pit - B/MV/17, B/MV/26, C/MV/02 - as highlighted "
Inspection and Compaction Test for NGL for MV Line from D/MV/04 to D/MV/34 and D/MV/32 to D/MV/3
Inspection and Compaction Test for backfilling sub-grade 1st Layer (1 of 1) for MV Line from D/MV/34
Inspection for Blinding Concrete under Non-Potable Water Line Isolation Pit for POC-40 and POC-44 at
"Surface Preparation prior to start backfilling around foul water line manhole FW-A-13-5, FW-A-13-6,
Surface Preparation Prior to Start Backfill for Storm Water Line Manhole MH-L-03 - As Highlighted
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 3) above Sand Covering for Fir
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 6) around MV Line Pit G/MV/28
Excavation & Bed preparation for Irrigation Line (90 mm dia) from Plant room to exit way from Outer
Inspection and Compaction Test for backfilling Sub-grade 4th Layer (4 of 7) around MV Line Pit G/MV/
Inspection and Compaction Test for Backfilling Sub-base 1st Layer (1 of 1) under 2nd lift of Rock for Bou
Inspection and Compaction Test for Backfilling Subgrade 2nd Layer (2 of 3) under 2nd lift of Rock for Bou
Installation of Rock and Boulder in Wadi-03 (Right Side) - 2nd layer (2 of 7)
Installation of Rock and Boulder in Wadi-03 (Right Side) - 1st layer (1 of 7)
Steel Reinforcements for ETFE PUMP ROOM Slab on Grade at axis 02-AR zone 1N (as highlighted) at CR
Shuttering for Infill wall inner at Crescent between axis (01-S & 01-R) (for 2 walls only) (As highlighte
Installation of EMT Conduit (Dia. 3/4) and Box for Voice Data (CAM, WIFI & Telephone) at Manage
Installation of EMT Conduit (Dia. 3/4) and Box for Fire Alarm (Speaker, Flashing Beacon, Break G
Installation of UPVC conduit (2x110mm dia.) Low Current (Fire and Security) Ductbank no. FG/D-FS/03
Installation of EMT Conduit (Dia. 3/4) and Box for Voice Data (CAM, WIFI & Telephone) at Manageme
Base Seal and Extrusion Aluminum Installation between Axis 01-G-01/H.
Installation of EMT Conduit (Dia. 3/4) and Box for Voice and Data (Data, WIFI, Telephone) at Man
"Notification to start backfilling works in Cretaceous Garden zone 2D,2E (as highlighted) "
Inspection and compaction test 4th layer for Backfilling inside Cafeteria building btween Axis 02A - 02D
Surface Preparation prior to backfilling inside Cafeteria building btween Axis 02B - 02D zone 2A (as High
Surface preparation & Base primer coating for ground beam between pc 78 to 80 at CRESCENT axis 01
Protection layer of 4mm thick bituminous protection board forPC 94-96-98 and strip footing top side a
Inspection of backfilling Gravel 1st Layer (1 of 1) for the Duct Bank of Telecommunications Line from B
Two coat of bituminous damp proofing coating of internal building for RF3 & W2 & C* Up to level 867
Surface preparation & Base primer coating of internal building for RF3 & W2 & C* Up to level 867.5 at
Surface preparation & Base primer coating of PC 94-96-98 and strip footing top side at CRESCENT axis
Two coat of bituminous damp proofing coating for ground beam between pc 78 to 80 at CRESCENT ax
Protection layer of 4mm thick bituminous protection board of internal building for RF3 & W2 & C* Up
Single layer of 4mm thick modified bituminous waterproofing membrane for PC 94-96-98 and strip foot
Protection layer of 4mm thick bituminous protection board for ground beam between pc 78 to 80 at
Level and Location for Infill outer wall at Crescent between (02-AW & 02-AX) (As highlighted) ZONE 2Q
Shuttering for Infill outer wall at Crescent between (02-AW & 02-AX) (As highlighted) ZONE 2Q
Shuttering for Infill inner wall between axis 01-J to 01-I (as highlighted), at CRESCENT Zone 1C (1st Stag
Level and Locaion for Infill inner wall between axis 01-J to 01-I (as highlighted), at CRESCENT Zone 1C (1
Shuttering for Infill inner wall at Crescent Boi 74-75 between (02-M & 02-N) (As highlighted) ZONE 2D
Level and Location for ETFE PUMP ROOM for blinding under SOG axis 02-AR zone 1N (as highlighted)
Steel Reeinforcements for Retaining Wall at Grid 01/C to 01/A Zone 6 & 7 at CRESCENT (as highlighted)
Level and Location for RC foundation of Retaining Wall at axis 02/M to 01/A Zone 6 & 7 at CRESCENT (a
'Warning Tape Pipe Installation For Irrigation ROW mainline Including Branches; (200mmØ- UPVC-Cla
'Warning Tape Pipe Installation For Non-Potable Water (Irrigation Line); (200 mmØ- UPVC-Claas-5)
' Warning Tape Installation in pipes OUT FALL-M for (dia 450 mm Ø- UPVC Pipes-Class 4 ) for Storm
Shuttering for RC foundation of Retaining Wall at axis 02/M to 01/A Zone 6 & 7 at CRESCENT (as highlig
Steel Reinforcements for RC foundation of Retaining Wall at axis 02/M to 01/A Zone 6 & 7 at CRESCENT
' Gravel 3/8" Backfilling and Geotextile in pipes OUT FALL-M for (dia 450 mm Ø- UPVC Pipes-Class
' Pipe Installation of Foul Water Line for (160 mmØ - UPVC- Class 4) from (FW-A-3-7 to FW-A-3-7-1 t
'Bedding of Gravel 3/8" and Geotextile Surrounding Foul Water Line for (160 mmØ - UPVC- Class 4)
Inspection and compaction test 10th and 11th layer for Backfilling at MCPE 2 wall inner axis AA-E (as
Antitermitte for MCPE 3 plinding under ground foundation at axis 02-P, 03-2 to 03-1 , LEVEL 870.35 Zon
Level and Location for Infill wall between BII BIV 107-108-109 between Gridline 02-1 AL - 02-1 AM - 0
Shuttering for Infill wall for Zone 2A between Axis 02-1, 02A-02B-02C (AS HIGHLIGHTED)
Block work from Lintel upto final Height of Internal walls (Remaining Part) Inside Public Toilet # 3, At
Stack Boulders Installed Layers at levels +874.40 & +874.80, along Open Channel (Boundary wall Side)
Surface Preparation Prior to Backfilling along Foundation of Boundary wall (Outer Face) (At Bottom of
Installation of stub-up UPVC Conduit (Dia. 110mm) for Fire Alarm Ducts (FA) at the Crescent-02 besi
Installation of stub-up UPVC Conduit (Dia. 110mm) for Low Current Ducts (ICT) at the Crescent-02 b
Steel Reinforcement for Columns (2nd lift, above the level +872.35) of Boundary Wall @ Grid (M/17-22
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 3) above Sand Covering for Po
Inspection and Compaction Test for Backfilling Subgrade 1st Layer (1 of 3) under 2nd lift of Rock for Bou
Inspection of Sand Covering to protect the pipe for RO Water Line at Zone-H - as highlighted in the att
Inspection of Sand Covering to protect the pipe for Non-Potable Water Line at Zone-H - as highlighted
Inspection and Compaction Test for Backfilling Subgrade 2nd Layer (2 of 2) under 2nd lift of Rock for Bou
Inspection for Installation of Non-Potable Water Line Pit - NPW-ISC-09, NPW-ISC-10, NPW-ISC-11 - as hi
'Pipe Installation (Dia400mm Ø- UPVC Pipes-Class 4) for Storm Water pipe Out Fall-K From (MH-K-09 t
'Bedding of Gravel 3/8" and Geotextile surrounding in pipes (Dia400mm Ø- UPVC Pipes-Class 4 ) for S
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 3) above Sand Covering for Po
Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 4) above Sand Covering for Fi
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 6) around MV Line Pit G/MV/28
Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 7) around MV Line Pit G/MV/
'Warning Tape Pipe Installation For Irrigation ROW Sub-mainline Including Branches; (90&50mmØ- UP
Inspection and Compaction Test for backfilling Sub-Grade 2nd Layer (2 of 4) for Fire & Security Line Pit
Inspection of Excavation for MV Line from D/MV/18 to E/MV/02 and D/MV/19 to E/MV/05 including all Pi
Inspection and compaction test 12th layer for backfilling of MCPE 1 axis 02/AN to 02/AP (as highlighte
Inspection and compaction test 10th and 11th layer for Mockup soil permability at crescent internal g
Inspection and compaction test 3rd and 4th layer for Backfilling strip footing at CRESCENT between PC
Excavation for Devonian Garden foundations between axis 02-AM & 02-AL zone 2M (as highlighted)
Steel Reinforcements for stair for CAFETERIA (as highlighted) ZONE 2A
Concreting for Retaining Wall grid 02-C Zone 7 at Crescent (as highlighted)
Shuttering for Retaining Wall grid 02-C Zone 7 at Crescent (as highlighted)
Level and Location for Retaining Wall grid 02-C Zone 7 at Crescent (as highlighted)
Concreting for Infill wall outer at Crescent between axis (02-E & 02-D) (As highlighted) ZONE 2B
Steel Reinforcements for Infill wall OUTER between axis 01-I to 01-H (as highlighted) Zone 1C at CRESC
Protection layer of 4mm thick bituminous protection board for Infill wall outer (inner side) and strip
Single layer of 4mm thick modified bituminous waterproofing membrane for Infill wall outer (inner side
Surface preparation & Base primer coating for Infill wall outer (inner side) and strip footing top sid
Protection layer of 4mm thick bituminous protection board for wall and counterfourt of MCPE 1 zone
Single layer of 4mm thick modified bituminous waterproofing membrane for ETFE room axis 02-AR to 0
Protection layer of 4mm thick bituminous protection board for ETFE room axis 02-AR to 02-AQ at CRES
Protection layer of 4mm thick bituminous protection board for wall of MCPE 4 zone 1N level 867.915
Two layer of 4mm thick modified bituminous membrane for wall of MCPE 4 zone 1N level 867.915
Two layer of 4mm thick modified bituminous membrane for wall and counterfourt of MCPE 1 zone 2M
surface preparation & solvent base primer for wall and counterfourt of MCPE 1 zone 2M 2N from level
Surface preparation & Base primer coating of ETFE room axis 02-AR to 02-AQ at CRESCENT (as highli
Anti termite for plain concrete at DEVONIAN GARDEN zone 2M BETWEEN axis 02-AN & 02-AL (as highl
Preliminary Inspection of remaining Erected Steel in Crescent 01, Zone 1 1K from Axis 0AE to 01AF (O
Installation of Straight PVC Conduit (Dia. 25mm) and Boxs for Lighting (LED F1/CE) in the Crescent-01
Steel Reinforcements for wall at MCPE 1 between axis( 03-1 & 02-2) Zone 2M 2N (as highlighted)
Inspection and compaction test 2nd layer for Backfilling inside Cafeteria building btween Axis 02A - 02D
Steel Reinforcements for RING BEAM Zone 1P (inner) Axis 01-AQ to 01-AP (as highlighted) at CRESCENT
Level and Location for walls (W1,W2) at CAFETERIA from level 862.00 to level 869.10 zone 2A (as highlig
Shuttering for walls (W1,W2) at CAFETERIA from level 862.00 to level 869.10 zone 2A (as highlighted)
Level and Location for wall (W3) at CAFETERIA from level 862.00 to level 863.55 zone 2A (as highlighted
Shuttering for wall (W3) at CAFETERIA from level 862.00 to level 863.55 zone 2A (as highlighted)
Concreting for walls (W1,W2) at CAFETERIA from level 862.00 to level 869.10 zone 2A (as highlighted)
Concreting for wall (W3) at CAFETERIA from level 862.00 to level 863.55 zone 2A (as highlighted)
Concreting for Infill Wall between Gridline 02-1/X - 02-1/Y Zone 2G (as highlighted)
Inspection of Installation and Alignment for the Crescent 01 Zone 1 - 1K, From Axis 01AD to 01AG.
Preliminary Inspection of remaining Erected Steel in Crescent 01, Zone 2 1H from Axis 01W to 01AA (
Concreting of MCPE 3 for plinding under ground slab between axis 02/S, 03-1 to 02-2 , 03/B, 03-1 to 02-
Concreting for Retaining Wall RC Foundation at Grid 01/C to 01/A level 866.10 Zone 6 & 7 (as highligh
Steel Reeinforcements for Gorund Beams (inner) between axis 01/W to 01/V zone 1G (as highlighted)
Shuttering for Gorund Beams (inner) between axis 01/W to 01/V zone 1G (as highlighted) at CRESCENT
Base Seal and Extrusion Aluminum Installation between Axis 02/M-02/N.
Concreting for 1st floor slab (stair) at south Small MOSQUE (as highlighted)
Shuttering for Norrth Adminstration building RC Foundation at Crescent along axis 02-AZ zone 2R (as hig
Level and location for Norrth Adminstration building RC Foundation at Crescent along axis 02-AZ zone 2
Steel Reinforcements for Retaining Wall grid 02-C Zone 7 at Crescent (as highlighted)
Steel Reinforcements for wall, counterfort and bottom slab of duct tunnel between axis 02-R to 02-P a
Concreting for wall at MCPE 1 axis 03R, 03/1 to 03/2 Zone 2M 2N (as highlighted)
Level and Location for building ( coulmns ) of NORTH ADMINSTRATION between axis 02/BC to 02/BB (as
Base Seal and Extrusion Aluminum Installation between Axis 02/L-02/M.
Base Seal and Extrusion Aluminum Installation between Axis 02/K-02/L.
Base Seal and Extrusion Aluminum Installation between Axis 02/J-02/K.
Base Seal and Extrusion Aluminum Installation between Axis 02I-02/J.
Base Seal and Extrusion Aluminum Installation between Axis 02/G-02/H.
Base Seal and Extrusion Aluminum Installation between Axis 02/H-02/I.
Base Seal and Extrusion Aluminum Installation between Axis 02/F-02/G..
Base Seal and Extrusion Aluminum Installation between Axis 02/E-02F.
Shuttering for Infill wall outer at Crescent between axis (02-E & 02-D) (As highlighted) ZONE 2B
Level and Location for Infill wall outer at Crescent between axis (02-E & 02-D) (As highlighted) ZONE 2B
Shuttering for Infill inner wall at Crescent between (02-AY & 02-AX) (As highlighted) ZONE 2Q
Level and Location for Infill inner wall at Crescent between (02-AY & 02-AX) (As highlighted) ZONE 2Q
Base Seal and Extrusion Aluminum Installation between Axis 02/D-02/E.
Concreting for Infill wall axis 02/AM to 02/AN (as highlighted) Zone 2M
Concreting for Infill wall kicker axis 02AO - 02AN zone 2M at Crescsent (as highlighted)
Preliminary Inspection of remaining Erected Steel in Crescent 02, Zone 6 2F from Axis 02U to 02T as p
Concreting for Retaining Wall blinding axis (01/C to 01/B) Zone 6 at Crescent (as highlighted)
Concreting for Blinding for Retaining Wall at axis 02/M to 02/K Zone 6 & 7 at CRESCENT (as highlighted)
Shuttering for building ( coulmns ) of NORTH ADMINSTRATION between axis 02/BC to 02/BB (as highlig
Warning Tiles & Tape above Low Current Lines of Fire Alarm & Security (From MH/WG/FA/01 to 03) In
Warning Tiles & Tape above Electrical Lines of Low Voltage (MH/WG/LV/01 to 03 & 04 to 08), Inside M
Inspection & Compaction tests of 5th Layer Backfilling (Sub-Grade) (Out of 7 layers) Behind Boulders
Sand Bedding for Water Feature Lines at Water Fountain of Geyser Garden, at Water Garden as highli
Excavation and Bed preparation for Water Feature Lines at Water Fountain of Geyser Garden, at Wate
Inspection of Thrust Blocks for Irrigation (Main, Sub & Sleeves) lines (part 4) ( 50, 110, 160 & 200 m
Inspection & Compaction tests of 5th (Final) Layer Backfilling (Sub-Grade) (Out of 5 layers) for Wat
Surface Preparation prior to Waterpoofing for Footings & Garde Beams @ Grid (1-3/C-I), Inside Energy
Slated Layer of 4 mm Thk. Modified Bitumenous Membrane on waterproofing of foundation & Kickers
Concrete Pouring for Blinding under Footings & Grade Beams @ Grid (K/4-13), at Energy Center 2, as
Coordinates & Levels of Blinding under Footings & Grade Beams @ Grid (K/4-13), at Energy Center 2, a
' Warning Tape Installation in pipes OUT FALL-Ofor ( Dia315&400mm Ø- UPVC Pipes-Class 4 ) for
' Warning Tape Installation in pipes OUT FALL-M for (dia 450 mm Ø- UPVC Pipes-Class 4 ) for Storm
' Gravel 3/8" Backfilling and Geotextile in pipes OUT FALL-O for ( Dia315&400mm Ø- UPVC Pipes-
' Gravel 3/8" Backfilling and Geotextile in pipes OUT FALL-M for (dia 450 mm Ø- UPVC Pipes-Class 4
Pre insulated Chilled Water Pipes (S&R) 200mmØ( laying ,Aligment ,Leveling and fit up) From point
Pre insulated Chilled Water Pipes (S&R) 65mmØ( laying ,Aligment ,Leveling and fit up) From point (
Inspection of backfilling Gravel for the Duct Bank of Telecommunications Line from k/TL/22 to k/TL/23 -
Inspection and Compaction Test for backfilling Sub-grade 10th Layer (10 of 12) under Cesspool-3 at Zone
Inspection and Compaction Test for backfilling sub-grade 1st Layer ( 1 of 1) above Sand Covering for RO
Inspection Compaction Test for backfilling Sub-grade 1st Layer (1 of 1) above Sand Covering for Non-Po
Inspection of Sand bedding under pipe for Non-Potable Water Line at Zone-L&M - as highlighted (Stock
Inspection and Compaction Test for Backfilling Subgrade 1st Layer (1 of 2) under 2nd lift of Rock for Bou
Inspection and Compaction Test for backfilling Sub-base 1st Layer (1 of 1) under Boulder No. WRB-25 -
Inspection of backfilling Gravel for the Duct Bank of Fire & Security Distribution Line from K/FS/07 to K/
Inspection and compaction Test for backfilling Sub-grade 1st Layer (1 of 1) above GreenTiles for Fire &
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 1) above Green Tiles for Tele
"Inspection of Concrete Pouring for Slab of MV Line Pulling Pit - H/MV/09 at Zone-H (As Highlighted) "
"Inspection of Formwork for Slab of MV Line Pulling Pit - H/MV/09 at Zone-H (As Highlighted) "
Sand Cover & Protection for Irrigation Sub-Main Line Distribution Network (50,90 mm line) at Discove
Excavation and Bed preparation for Sub surface Pipes (dia 110 mm Sub main & Sleeves) at entrance of
Sand Bedding for Low Current Lines of Fire Alarm & Security (from MH/WG/FA/07 to Pulling Pit), Insid
Concrete Pouring for Blinding under Electrical Handhole of Low Voltage (MH/WG/LV/22) at Water Pla
Sand Bedding for Electrical Line of LV Submain Cable Containment & From Pulling Pit to (MH/WG/LV/
Coordinates & Levels for Columns (above the level +872.35) of Boundary Wall @ Grid (R/22-28), at Ene
Coordinates & Levels for Footings & Garde Beams @ Grid (4-6/D-H), Inside Energy Center 2, as highlig
Concrete Pouring & Shuttering for Columns (above the level +872.35) of Boundary Wall @ Grid (R/22-2
Steel Reinforcement for Columns of Boundary Wall @ Grid (J-L/0-4 & L/4-6), at Energy Center 2, as hi
Concrete Pouring & Shuttering for Footings & Garde Beams @ Grid (4-6/D-H), Inside Energy Center 2,
Steel Reinforcement for Footings & Garde Beams @ Grid (4-6/D-H), Inside Energy Center 2, as highlig
Surface Preparation prior to Waterpoofing for Beams of Jetty 1 & Jetty 2 at Boat Garden inside Water
Crazy Cut Stone Cladding for Walls of Seat Walls (External) (08 no's) All Sides, at Butterfly Garden, as
Marking & Check for coordinates of Tree Pits (08 no's) Along Boundary Wall (Inner side), at Discovery
Installation of straight PVC conduit (Dia 32mm) and Box for Lighting (B2 & B2/CE) at the Physic Garden
Inspection of Formwork for Wall of MV Line Pulling Pit - G/MV/13 at Zone-G (As Highlighted)
INSPECTION OF INSTALLATION OF ALL RINGS (RAISER) AND SLAB FOR FW-A-07 (AS ATTACHED)
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 3) above Sand Covering for Fir
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 3) above Sand Covering for Pot
Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 3) under Boulder No. WRB-25 -
Inspection of Excavation for MV Line from D/MV/18 to E/MV/09 and D/MV/19 to E/MV/08 including all Pi
Inspection of Steel Reinforcement for Slab of MV Line Pulling Pit - H/MV/09 at Zone-H (As Highlighted)
"Inspection and Compaction Test for backfilling Sub-Grade 3rd Layer (3 of 4) for Telecommunication Line
"Inspection and Compaction Test for backfilling Sub-Grade 3rd Layer (3 of 4) for Fire & Security Line Pi
Inspection and Compaction test for backfilling Sub-grade 3rd Layer (3 of 3) above Sand Covering for N
Inspection of Concrete Pouring for Wall of MV Line Pulling Pit - G/MV/13 at Zone-G&H (As Highlighted)
Inspection and Compaction Test for Backfilling Sub-base 1st Layer (1 of 1) under 2nd lift of Rock for Bou
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 3) above Sand Covering for Po
"INSPECTION FOR INSTALLATION OF ALL RINGS (RISER) AND SLAB FOR FW-A-3-14 (As Highlighted) "
INSPECTION FOR MANHOLE BASE INSTALLATION AND UPVC PIPE CONNECTION FOR - FW-A-3-5 (As Highli
Inspection of Steel Reinforcement for Slab of MV Line Pulling Pit - C/MV/38, C/MV/08, C/MV/22, C/M
Inspection of Surface preparation prior to start Waterproofing and Waterproofing , Application of Pri
Inspection of Sand Covering to protect the pipe for RO Water Line at Zone-C - as highlighted in the att
Inspection of Sand Covering to protect the pipe for Non-Potable Water Line at Zone-C - as highlighted
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 4) above Sand Covering for Fi
Inspection of Excavation for Non-Potable Water Line at Zone-L&M - as highlighted
Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 3) above Sand Covering for No
INSPECTION FOR INSTALLATION OF SLAB FOR MH-O-09 (As Highlighted)
Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 3) above Sand Covering for No
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 3) under Boulder No. WRB-25 -
Inspection of Thrust Block for RO Water Line ( Dia 200mm) at Zone-B,C,H - As Highlighted ( SCR : KAIG
"Inspection of Thrust Block for Non-Potable Water Line ( Dia 160mm & 200mm) at Zone-B,C,H - As Hig
"INSPECTION FOR INSTALLATION OF ALL RINGS (RISER) AND SLAB FOR MH-K-09 (As Highlighted) "
'Pipe Installation (dia 450 mm Ø- UPVC Pipes-Class 4 ) for Storm Water pipe Out Fall-M ( MH-M-04 t
"INSPECTION FOR INSTALLATION OF ALL RINGS (RISER) AND SLAB FOR FW-A-3-7.1 (As Highlighted) "
Pre insulated Chilled Water Pipes (S&R) 65mmØ( laying ,Aligment ,Leveling and fit up) From point (
Pre insulated Chilled Water Pipes (S&R) 200mmØ (laying ,Aligment ,Leveling and fit up) From point
Inspection Of Pipe Installation For Irrigation ROW Sub-mainline Including Branches; (63mmØ- UPVC-
'Warning Tape Pipe Installation For Irrigation ROW mainline Including Branches; (200mmØ- UPVC-Cla
Concreting for (vertical) Infill wall between Gridline 02X to 02Y (As highlighted) ZONE 2G
Shuttering for plain concrete at DEVONIAN GARDEN zone 2M BETWEEN axis 02-AN & 02-AL (as highlig
Level and Location for plain concrete at DEVONIAN GARDEN zone 2M BETWEEN axis 02-AN & 02-AL (as
Level and Location for Blinding for Retaining Wall at axis 02/M to 02/K Zone 6 & 7 at CRESCENT (as high
Concreting for Infill inner wall at Crescent Boi 74-75 between (02-M & 02-N) (As highlighted) ZONE 2D
Level and Location for Infill inner wall at Crescent Boi 74-75 between (02-M & 02-N) (As highlighted) Z
Inspection and compaction test 6th layer for backfilling at TIP Zone 1A(as highlighted) ( 6th of 7th laye
Surface Preparation prior to Backfilling at Chid Care between axis (02AT , 02AR) & (02-2 , 02-1) (as Hig
Level and Location for wall at MCPE 1 axis (03-1, 03-2 to 03-U) up to level 874.40 & 875.55 Zone 2M 2N
Base Seal and Extrusion Aluminum Installation between Axis 01/F - 01/G.
Shuttering for wall at MCPE 1 axis (03-1, 03-2 to 03-U) up to level 874.40 & 875.55 Zone 2M 2N (as h
Base Seal and Extrusion Aluminum Installation between Axis 01/E - 01/F.
Concreting for wall at MCPE 1 axis (03-1, 03-2 to 03-U) up to level 874.40 & 875.55 Zone 2M 2N (as hi
Base Seal and Extrusion Aluminum Installation between Axis 01/D - 01/E.
Shuttering for Blinding under strip footing between PC( 128 & 130 )inner Zone 2F (as highlighted) KAI
Antitermite for Blinding under strip footing between PC( 128 & 130 )inner Zone 2F (as highlighted) KA
Level and Location for Blinding under strip footing between PC( 128 & 130 )inner Zone 2F (as highligh
Level and Location for Strip Footing between axis 01/W to 01/V zone 1G (as highlighted) at CRESCENT
Surface preparation and Base primer coating under bottom slab of duct tunnel along axis 03-A, 03-B, 03
Excavation for Devonian Garden foundation zone 2M (as highlighted)
Excavation for Hot Water (Supply and Return) pipes and CHW (Supply and Return) pipes at MCPE 3 axis 0
Concreting for Diaphragm Wall axis 02/AQ (as highlighted) Zone 2N LEVEL 874.00
Steel Reinforcements for Infill inner wall between axis 02-E to 02-D (as highlighted) at CRESCENT Zone
Installation of Straight PVC Conduit (Dia. 25mm) and Boxes for Fire Alarm (Speaker) in the Crescent-0
Installation of Straight PVC Conduit (Dia. 25mm) and Boxs for Lighting (LED F1/CE) in the Crescent-01
Installation of straight UPVC Conduit (Dia. 160mm) Medium Voltage Ductbank no. HH/D-MV/27
Inspection and FDT for backfilling Sub-grade 3rd Layer (3 of 4) above Sand Covering for Non-Potable Wa
"INSPECTION FOR INSTALLATION OF ALL RINGS (RISER) AND SLAB FOR MH-K-08 (As Highlighted) "
Concrete Pouring for Precast Panel Type-1 (8 no's), Type-2 (5 no), Type-3 (1 no's) & Type-4 (1 no's), a
Concrete Pouring & Shuttering for walls of New Ticketing Booth # 5A, As per Attached Highlighted Dr
Excavation & Bed Preparation for Low Current Lines of Fire Alarm & Security (from MH/WG/FA/07 to Pul
Excavation & Soil Preparation for Open Channel 2, (Wadi # 2), Inside Water Garden, At Highlighted a
Excavation for Tree Pits (08 no's) Along Boundary Wall (Inner side), at Discovery Garden, as highlight
Inspection and Compaction test for backfilling sub-grade 1st Layer (1 of 4) for Telecommunication and F
Inspection and Compaction Test for Backfilling Sub-grade 10th Layer (10 of 12) above Gravel around M
Excavation & Blinding Levels for Electrical Handhole of Low Voltage (MH/WG/LV/22) at Water Play Ga
Excavation for Electrical Line From Pulling Pit to (MH/WG/LV/23) to (MH/WG/LV/22) , at water Play G
Block work from Lintel upto final Height for The walls Inside Public Toilet # 2, At highlighted area in
Inspection & Compaction tests of 1st Layer (Sub-Grade) Backfilling (Out of 3 layers) along Foundation
Excavation for Electrical Line of LV Submain Cable Containment , at water Play Garden inside Water G
Sand Cover for Low Current Lines of Telecom (from MH/ZG/TC/06 to 07), at Maze Garden, as highlig
Warning Tiles & Warning Tape for Low Current Lines (from MH/WG/LC/5 to 9) and Fire Alarm & Securi
Geotextile sheet & Screed Protection under bottom slab of duct tunnel along axis 03-A, 03-B, 03-C, and
Steel Reinforcements for Infill wall between BIV 108-109 between Gridline 02-1 AM - 02-1 AN (As high
Warning Tiles & Warning Tape for Electrical Lines of Low Voltage (MH/WG/LV/17 to 21), ((MH/WG/LV
' Warning Tape Installation in pipes OUT FALL-O for (315 mm Ø- UPVC Pipes-Class 4 ) for Storm Wa
Two layer of 4mm thick modified bituminous waterproofing membrane under bottom slab of duct tunnel
' Gravel 3/8" Backfilling and Geotextile in pipes OUT FALL-O for (315 mm Ø- UPVC Pipes-Class 4 )
Protection Layer of 4 mm Thk. Bitomenous Protection Board for foundation of boundary wall (Inner fa
Protection Layer of 4 mm Thk. Bitomenous Protection Board for foundation & Kickers of Boundary wal
Steel Reinforcements for Infill wall inner at Crescent between axis (01-S & 01-R) (As highlighted) ZONE
Steel Reinforcements for Infill wall inner at Crescent between axis (02-Q & 02-R)BIV 80 and axis (02-P
Concreting for Infill inner wall beams at Crescent between axis (02-O & 02-P) and (02-Q & 02-R) (As h
Inspection and compaction test 4th layer for Backfilling strip footing at CRESCENT between PC 92-94 ax
Inspection and compaction test 9th layer Backfill at cafeteria W33 Axis 02D - 02E, Zone 2B (as highligh
Inspection and compaction test 8th and 9th layer for Mockup soil permability at crescent internal gar
Inspection and compaction test 3rd layer for Backfilling inside Cafeteria building btween Axis 02A - 02D
Inspection and compaction test 3rd layer Backfilling strip footing at CRESCENT between PC 22-24 Axis 0
Inspection and compaction test 8th and 9th layer for Backfilling at MCPE 2 wall inner axis AA-E (as hi
Inspection and compaction test 2nd layer Backfilling around strip footing at Chid Care between (as Hi
Excavation for retaining wall between axis 02/M to axis 02/K as highlighted Zone 6 & 7 (as highlighted)
Inspection for Installation of MV Line Junction Pit - B/MV/17, G/MV/14 - as highlighted
"Inspection for Installation of MV Line Junction Pit - F/MV/11, F/MV/06 - as highlighted "
"Inspection for Installation of Fire Water Line Isolation Pit K/F/08 at Zone - G - as highlighted "
Inspection for Installation of MV Line Junction Pit - B/MV/13, F/MV/04, F/MV/05, G/MV/24 - as highligh
Installation of Rock and Boulder in Wadi-03 (Left Side) - 2nd layer (2 of 7)
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 3) under Boulder No. WRB-25 -
Inspection and Compaction Test for backfilling Sub-Base (as Rock area) under Boulder No. WRB- 55 - A
Inspection and Compaction Test for backfilling Sub-Base (as Rock area) under Boulder No. WRB- 54 - A
Inspection and Compaction Test for Backfilling Sub-base 1st Layer (1 of 1) under 3rd lift of Rock for Boul
Soil Preparation under Boulder No. WRB- 55 after cutting
Soil Preparation under Boulder No. WRB- 54 after cutting
Inspection of Formwork for Footing of MV Line Pulling Pit - G/MV/38 at Zone-G (As Highlighted) ( SC
Surface Preparation prior to start backfilling around MV Line Pit G/MV/28 at Zone-G (As Highlighted)
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 3) above Sand Covering for N
"Inspection of Concrete (Plain) Pouring for Duct Bank of Fire & Security line from C/FS/10 to C/FS/09
Inspection of Concrete (Plain) Pouring for Duct Bank of Telecommunications line from B/TL/11 to C/TL/
Inspection & Compaction tests of 2nd (Final) Layer (Sub-Grade) Backfilling (Out of 2 layers) for Low
Inspection & Compaction tests of 2nd (Final) Layer (Sub-Grade) Backfilling (Out of 2 layers) for Ele
Inspection of Thrust Block for Water Feature Lines (HDPE dia 250 & 200 mm) from Water play garden
Sand Bedding for Low Current Lines of Fire Alarm & Security lines (MH/WG/FA/26 to 31), inside Boat
Sand Bedding for Electrical Lines of Low Voltage (MH/WG/LV/44 to 47) and Emergency lines (MH/WG/
Sand Bedding for Water Feature Lines (HDPE dia 110 mm) along the Pool, inside Butterfly Garden, as h
Coordinates & Levels for walls of New Ticketing Booth # 5A, As per Attached Highlighted Drawing's.
Coordinates and Levels of Blinding for Fountain 1, At Inner Side of Plant room, Inside Physic Garden,
Coordinates & Levels for Beams (At level +872.35) of Boundary Wall @ Grid (28-29/M & R and 29-30/M-
Coordinates & Levels for Footings & Garde Beams @ Grid (7-8/D-H), Inside Energy Center 2, as highlig
Concrete Pouring for Blinding under Fountain 1, At Inner Side of Plant room, Inside Physic Garden, as
Concrete Pouring & Shuttering for Beams (At level +872.35) of Boundary Wall @ Grid (28-29/M & R an
Concrete Pouring & Shuttering for Footings & Garde Beams @ Grid (7-8/D-H), Inside Energy Center 2,
Steel Reinforcement for Footings & Garde Beams @ Grid (7-8/D-H), Inside Energy Center 2, as highlig
Sand Cover & Protection for Low Current Lines of Telecom (from MH/WG/LC/5 to 9) and Fire Alarm & S
Sand Cover & Protection for Electrical Lines of Low Voltage (MH/WG/LV/24 to 28) and Emergency lin
Installation of UPVC Ducts (Dia. 110mm) Low Current Ductbank (Fire Alarm) Passing the Wall of the
Installation of straight UPVC Ducts (Dia. 160mm) Low Voltage Ductbank Passing the Wall of the MCPE
Installation of straight PVC Conduit (Dia. 25mm) and Box for Security (Door Release, Door Controller,
Installation of PVC Conduit (Dia. 25mm) for Lighting (EXIT Sign) at the Crescent-02 at the Infill Wall
Installation of straight PVC Conduit (Dia. 25mm) and Box for Fire Alarm (Break Glass) at Crescent-02 N
Inspection Of Pipe Installation For Irrigation ROW main Line Including Branches; (200mmØ- UPVC-Cla
'Warning Tape Pipe Installation For Non-Potable Water(Irrigation Line ); (200mmØ- UPVC-Claas-5 ) (
'Fire Fighting Networks Sand Cover & Pipes Protection (30 cm above Pipes) (Red Line). As per highlig
'Potable Water Pipes Sand Cover & Pipes Protection (30 cm above Pipes). As per highlighted Area in
Preliminary Inspection of remaining Erected Steel in Crescent 01, Zone 3 1G from Axis 01U to 01W.
Preliminary Inspection of remaining Erected Steel in Crescent 02, Zone 5 2H from Axis 02AB to 01Y.
Preliminary Inspection of Erected Steel in Crescent 01, Zone 1 1L from Axis 01AG to 01AJ.
Weld Visual & NDT Inspection for the Washer Plates in Crescent 01, Zone 1 1L, 1M & 1N Axis (01AG t
Weld Visual & NDT Inspection of Management Building from Grid Line E-FG/03 to 06, P-Q-R/03 to 06.
Weld Visual & NDT Inspection for the Crescent 02, Zone 6 - 2F Axis (02U, 02T).
Weld Visual & NDT Inspection of Partition wall Crescent 02, Zone 3 - 2N Axis 02AR.
Inspection of Installation, Alignment and Bolt Tightening for the Metal Cladding in Crescent 01 Zone
Bolt Tightening Inspection of Crescent 01, Zone 2 - 1H from Axis 01W to 01AA.
Inspection of Installation and Alignment for the Management Building from Grid Line E-F-G/03 to 06,
Preliminary Inspection of Erected Steel in Crescent 01, Zone 1 1J & 1K from Axis 01AA to 01AG.
Inspection of Installation, Alignment and Bolt Tightening for the Metal Cladding in Crescent 01 Zone 3
Bolt Tightening Inspection of Partition wall, Crescent 02 Zone 3 - 2N Axis 2AR.
Inspection of Installation and Alignment for the Crescent 01 Zone 2 - 1H, From Axis 01W to 01AA
Final Inspection for the Crescent 02, Zone 5 - 2H & 2G from Axis (02AB to 02V).
Bolt Tightening Inspection of Crescent 02, Zone 6 - 2F from Axis 02U, 02T.
Surface Preparation and Paint Touch Up Inspection for the Metal Cladding in Crescent 02, Zone 6- 2F
Inspection of Installation, Alignment and Bolt Tightening for the Metal Cladding in Crescent 02 Zone 6
Inspection and Compaction test for backfilling Sub-grade 2nd Layer (2 of 3) above Sand Covering for N
Inspection of Sand bedding under pipe for Fire Water Line at Zone-G - as highlighted (Stock Pile# 132)
Inspection of Sand bedding under pipe for Potable Water Line at Zone-G - as highlighted (Stock Pile# 13
Inspection of Sand bedding under pipe for RO Water Line at Area-A &D - As highlighted (Stock Pile# 132)
Soil Preparation under Boulder No. WRB-25
Excavation and Removal of Disposal Material in Wadi-03 (Right Side) as per approved shop drawing KA
"INSPECTION FOR INSTALLATION OF SLAB FOR MH-M-12, MH-M-13 (As Highlighted)"
Inspection for Installation of MV Line Junction Pit - C/MV/15 - as highlighted
Surface Preparation Prior to start Backfilling strip footing at CRESCENT between PC 21-23-25 Axis 01K
Inspection and compaction test 5th, 6th and 7th layer for Mockup soil permability at crescent internal
Protection layer of 4mm thick bituminous protection board for bottom slab of duct tunnel between axis
Two layer of 4mm thick modified bituminous waterproofing membrane for bottom slab of duct tunnel bet
Surface preparation and Base primer coating for bottom slab of duct tunnel between axis 02-2 to 03-1 ,
Level and Location for internal Column of Adminstration building at Crescent between axis 02-BB & 02-
Shuttering for internal Column of Adminstration building at Crescent between axis 02-BB & 02-BC Zone
Steel Reinforcements for MCPE 1 slab axis (03-S , 03-R) and (03/1 , 03/2) Zone 2M 2N (as highlight
Shuttering for internal foundation (walls & coumns ) of NORTH ADMINSTRATION between axis 02/BA to
Steel Reinforcements for internal foundation (walls & coumns ) of NORTH ADMINSTRATION between axis
Level and Location for internal foundation (walls & coumns ) of NORTH ADMINSTRATION between axis 0
Concreting for South watch tower for Retaining Wall Kicker grid 02-C Zone 7
Level and Location for South watch tower for Retaining Wall Kicker grid 02-C Zone 7
Shuttering for South watch tower for Retaining Wall Kicker grid 02-C Zone 7
Shuttering for Infill wall (inner) from 02-R to 02-S (as highlighted) Zone 2F(1st STAGE )
Level and Location for Infill wall (inner) from 02-R to 02-S (as highlighted) Zone 2F(1st STAGE )
Shuttering for Infill inner wall between axis 02-AM & 02-AL (As highlighted) ZONE 2M
Concreting for Infill wall inner between axis 02-AM & 02-AL (As highlighted) ZONE 2M
Steel Reinforcements for Infill wall inner at Crescent between axis (02-Y & 02-X) (As highlighted) ZON
Concreting for Infill inner wall between (01-H & 01-I) 2nd Stage (As highlighted) ZONE 1C
Shuttering for Infill inner wall between (01-H & 01-I) 2nd Stage (As highlighted) ZONE 1C
Level and Location for Infill inner wall between axis 02-AM & 02-AL (As highlighted) ZONE 2M
Level and Location for Infill inner wall between (01-H & 01-I) 2nd Stage (As highlighted) ZONE 1C
' Warning Tape Installation in pipes OUT FALL-E for ( 315 mm Ø- UPVC Pipes-Class 4 ) for Storm Wate
' Warning Tape Installation in pipes OUT FALL-M for (dia 450 mm Ø- UPVC Pipes-Class 4 ) for Storm
' Gravel 3/8" Backfilling and Geotextile in pipes OUT FALL-E for ( 315 mm Ø- UPVC Pipes-Class 4 ) fo
' Gravel 3/8" Backfilling and Geotextile in pipes OUT FALL-M for (dia 450 mm Ø- UPVC Pipes-Class 4
Installation of stub-up UPVC conduit (2x110mm) for Power passing through the wall at the Crescent -2
HDPE Pipe Installation of Water Features pipes; (250mm SDR11-PE100); As per High lighted Attache
'Pipe Installation(110 mm Ø- UPVC Pipes-Class 4 ) for Storm Water pipe Out Fall-K Next to ( MH-K-09
'Bedding of Gravel 3/8" and Geotextile surrounding in pipes (110 mm Ø- UPVC Pipes-Class 4 ) for Stor
Inspection of Sand Covering to protect the pipe for Non-Potable Water Line at Plaza Area - as highlight
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 4) above Sand Covering for Fir
Inspection of Sand bedding under pipe for RO Water Line at Area-B - As highlighted (Stock Pile# 132)
Inspection of Sand bedding under pipe for Non-Potable Water Line at Zone-C - as highlighted (Stock Pile
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 3) above Gravel for Manhole
"Inspection and Compaction Test for backfilling Sub-grade 4th Layer (4 of 4) around MV Line Pit B/MV
Inspection and Compaction Test for backfilling sub-grade 2nd Layer (2 of 2) beside Fire & Security Distr
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 2) beside MV Line from B/
Soil Preparation under Boulder No. WRB- 55 priior to start cutting
Soil Preparation under Boulder No. WRB- 54 priior to start cutting
Inspection and Compaction Test for backfilling sub-grade 3rd Layer ( 3 of 3 ) for storm water Line b
Inspection of Surface preparation prior to start Waterproofing and Waterproofing , Application of
Inspection and FDT for backfilling Sub-grade 2nd Laye (2 of 4) above Sand Covering for Non-Potable Wat
Inspection of Steel Reinforcement for Footing and wall of MV Line Pulling Pit - B/MV/11 at Zone-B (As H
"Inspection of Casting the Concrete Encasement and Surface Preperation prior to start waterproofin
Inspection and compaction test 14th and 15th layer for backfilling for TUNNEL 2(between axis 02-T & 0
Inspection and compaction test 11th layer for backfilling of MCPE 1 axis 02/AN to 02/AP (as highlighte
Inspection and compaction test 7th and 8th layer Backfill at cafeteria W33 Axis 02D - 02E, Zone 2B (as
Concreting for Roof slab at MCPE 1 axis (03-S , 03-R) and (03/1 , 03/2) Zone 2M 2N (as highlighted)
Steel Reinforcements for Wall and coulmns of Diaphragm Wall axis 02/AQ (as highlighted) Zone 2M fr
Concreting for Diaphragm Wall axis 02AQ (as highlighted) Zone 2N
Steel Reinforcements for Infill inner wall between axis 01-J to 01-I (as highlighted), at CRESCENT Zone 1
Concreting for Infill wall kicker axis 02/AC to 02/AD (as highlighted) Zone 2J
Shuttering for Infill wall between axis 02/AO to 02/AN (as highlighted), at CRESCENT Zone 2M
Concreting for Infill wall for Zone 2A, 2B between Axis 02-1, 02-2 02D (AS HIGHLIGHTED)
Concreting for Infill outer wall at Crescent between axis (02-AA & 02-AB) (As highlighted) ZONE 2H
Surface preparation prior to Stone Cladding for Wall & Column of Boundary wall (All Sides) @ span 1
Level and Location for Infill wall between axis 02/AO to 02/AN (as highlighted), at CRESCENT Zone 2M
Concreting for Infill Wall at Zone 2C between Between Gridline 02-2/I - 02-2/J (as highlighted)
Shuttering for walls (W28,W29,W30,) at CAFETERIA zone 2A (as highlighted)
Level and Location for walls (W28,W29,W30,) at CAFETERIA zone 2A (as highlighted)
Concerting for walls ( W31, W32) at CAFETERIA zone 2A (as highlighted)
Shuttering for walls ( W16, W17, W18, W19) at CAFETERIA between zone 2A (as highlighted)
Surface preparation prior to Stone Cladding for Seat walls and Walls of Whispering Caves (All Sides)
Shuttering for walls ( W31, W32) at CAFETERIA zone 2A (as highlighted)
Level and Location for walls (W31, W32) at CAFETERIA zone 2A (as highlighted)
Level and Location for walls (W16, W17, W18, W19) at CAFETERIA zone 2A (as highlighted)
Steel Reinforcement for Infill Wall between (02/AS & 02/AR) as highlighted Zone 2N, SCR-A-0184.
Surface Preparation Prior to Stone Cladding for Walls of Seat Walls (08 no's) All Sides, inside Butterfl
Level and Location for 1st floor slab (stair) at south Small MOSQUE (as highlighted)
Surface Preparation prior to Stone Cladding for Seat Walls (Inner) of (for Inner & Top sides) of Physic
Steel Reinforcements for 1st floor slab (stair) at south Small MOSQUE (as highlighted)
Shuttering for 1st floor slab (stair) at south Small MOSQUE (as highlighted)
Inspection & Compaction tests of Single Layer (Sub-Base) Backfilling between Boundary Wall & Circula
Aluminium Flashing & Sealant on Water Proofing for Foundation of Boundary wall (Outer Face) @ Grid
Single layer 4mm thick modified bituminous waterproofing membrane for foundation of boundary wall
Concrete Pouring & Shuttering for Columns of Boundary Wall @ Grid (A/6-12B), at Energy Center 2, as
Coordinates & Levels for Columns of Boundary Wall @ Grid (A/6-12B), at Energy Center 2, as highligh
Installation of Straight PVC Conduit (Dia. 25mm) and Boxes for Fire Alarm System (Speaker) at the Caf
Installation of Straight PVC Conduit (Dia. 25mm) and Box for Fire Alarm (Speaker) at Infill Wall Axis
Installation of UPVC conduit (2x110mm dia.) Low Current Ductbank (Fire & Security) no. BFG/D-FS/0
Installation of UPVC conduit (4x110mm dia.) Low Current Ductbank (TELECOM) no. BFG/D-TL/01 betwe
Mechanical Pipe Sleeves Installation From (Condensed drain,SP Pipe,Wast Pipe) to the Walls 16,17
' Warning Tape Installation in pipes OUT FALL-M for (dia 450 mm Ø- UPVC Pipes-Class 4 ) for Storm
' Gravel 3/8" Backfilling and Geotextile in pipes OUT FALL-M for (dia 450 mm Ø- UPVC Pipes-Class 4
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 3) above Gravel for Manhole
Inspection for Installation of Slab for MV Line Pulling Pit - B/MV/23, G/MV/21 at Zone-B&G (As Highlight
Inspection Of Pipe Installation For Irrigation ROW mainline Including Branches; (200mmØ- UPVC-Claa
Inspection and Compaction Test for backfilling Sub-grade 5th Layer (5 of 6) for Storm Water Line fro
Inspection of Concrete Pouring for the Footing and Kicker of SBC-07 - As Highlighted
Inspection Of Pipe Installation For Non-Potable Water (Irrigation Main Line); (200 mmØ- UPVC-Claas-
Inspection of Formwork for the Footing and Kicker of SBC-07 - As Highlighted
Inspection of Excavation for Non-Potable Water Line at Zone-C - as highlighted
'Warning Tape Installation of Fire Fighting Networks for (250mmØ-UPVC-Class-5). As per highlighted
'Warning Tape Installation of Potable Water Pipe for (200mmØ-UPVC-Class-5). As per highlighted Are
Inspection of Excavation for Non-Potable Water Line Isolation Pit - POC-NPW/FC at Zone-B - as highlight
Steel Reinforcements for internal columns of North Adminstration buliding between axis (02-BB & 02-AZ
Steel Reinforcements for wall ( W6 & W7 ) at CAFETERIA between axis (A & B) zone 2A (as highlighted)
Shuttering for Infill outer wall at Crescent between axis (02-AA & 02-AB) (As highlighted) ZONE 2H
Level and location for Infill outer wall at Crescent between axis (02-AA & 02-AB) (As highlighted) ZON
Steel Reinforcements for Infill inner wall at Crescent between BII 122 -123 axis (02-AY & 02-AX) (As h
Steel Reinforcements for Infill outer wall at Crescent between BOV 121-122 axis between (02-AX & 02
Surface Preparation for Mockup soil permability at crescent internal garden (as Highlighted) Zone 2L
Level and Location for Excavation for Retaining Wall at CRESCENT Zone 6 and 7 from axis 02M to 02K (as
Inspection and compaction test 1st layer Backfilling around strip footing at Chid Care between (as H
Inspection and compaction test 3rd and 4th layer for Mockup soil permability at crescent internal gar
Surface Preparation Prior to start Backfilling for Infill wall axis 01/T to 01/S Zone 1G (as highlighted)
" Protection layer of 4mm thick bituminous protection board for RAFT(4), W10, W11, C4 and C5 in cafete
"Two coat of bituminous damp proofing coating for RAFT(4), W10, W11, C4 and C5 in cafeteria building
"Protection layer of 4mm thick bituminous protection board for WALL BETWEEN BII,BIV 63 at cafeteria b
"Two layer of 4mm thick modified bituminous waterproofing membrane for WALL BETWEEN BII,BIV 63 at
"Surface preparation & Base primer coating for walls W33,34,35 cafeteria building zone 2A up to level
"Protection layer of 4mm thick bituminous protection board for walls W33,34,35 cafeteria building zone
"Surface preparation & Base primer coating for WALL BETWEEN BII,BIV 63 at cafeteria building zone 2A
"TWO Damp proof for RAFT(1) foundation cafeteria building zone 2A ,ONLY FOUNDATION SIDE (as highli
"Two coat of bituminous damp proofing coating for walls W33,34,35 cafeteria building zone 2A up to lev
" Protection layer of 4mm thick bituminous protection board for RAFT(1) foundation cafeteria buildin
"Surface preparation & Base primer coating for RAFT(1) foundation cafeteria building zone 2A ,ONLY F
"Surface preparation & Base primer coating for RAFT(4), W10, W11, C4 and C5 in cafeteria building zone
Laying lower EPDM layer including TWO Protection layers of Geotextile as per approved matrial as hi
Surface Preparation Prior to Backfilling along Foundation of Plant Room (from Outer sides)(at B.O.B L
Warning Tiles & Warning Tape for Low Current Lines of Telecom (from MH/ZG/TC/6 to 8), Inside Maze
Installation of Rock and Boulder in Wadi-03 (Left Side) - 1st layer (1 of 7)
Inspection and Compaction Test for Backfilling Subgrade 1st Layer (1 of 1) under 2nd lift of Rock for Bou
"Inspection of backfilling Gravel 1st Layer (1 of 1) for the Duct Bank of Telecommunications Line from
Inspection of Surface preparation prior to start Waterproofing and Waterproofing , Application of Pr
Level and Location for RING BEAM Zone 1K (OUTER) Axis 01-AG to 01-AF(as highlighted),at CRESCENT
Sand Cover & Protection for Low Current Lines of Telecom (from MH/ZG/TC/6 to 8), Inside Maze Garde
Coordinates & Levels of Blinding under Footings & Grade Beams @ Grid (B/7-11B), at Energy Center 2,
Rough Coat (Spatter Dash) Prior to Plastering of Parapet wall (from Internal Side) at Grid (3/A-E & A
Concrete Pouring for Blinding under Footings & Grade Beams @ Grid (B/7-11B), at Energy Center 2, as
Shuttering and Scaffoldings for RING BEAM Zone 1K (OUTER) Axis 01-AG to 01-AF(as highlighted),at C
Protection Layer of 4 mm Thk. Bitomenous Protection Board for Footings & Walls of Seat Walls (08 no's)
Concreting for Tunnel 1 (part C) Suspended Slab and Strip footing between PC 144-146 Zone 2H (as hi
Concreting for RC Strip Footing between PC 97-99 Zone 2B (as highlighted)
' Warning Tape Installation in pipes OUT FALL-G for(PP 600 mm Ø- UPVC Pipes-Class 4 ) for Storm Wa
' Gravel 3/8" Backfilling and Geotextile in pipes OUT FALL-G for (PP 600 mm Ø- UPVC Pipes-Class 4 )
'Potable Water Pipes Sand Cover & Pipes Protection (30 cm above Pipes). As per highlighted Area in
'Fire Fighting Networks Sand Cover & Pipes Protection (30 cm above Pipes). As per highlighted Area
Installation and Survey Report for Location and Levels of Anchor Bolts for RING BEAM Zone 1K (OUTER)
"Inspection and compaction test 1st and 2nd layer for Backfilling retianing wall Axis 01/AA - 01/AH, (as
Shuttering for Diaphragm Wall at grid 02/AQ bewteen axis (02-1 , 02-2 ) Zone 2N (as highlighted) 2nd St
Concerting for Diaphragm Wall at grid 02/AQ bewteen axis (02-1 , 02-2 ) Zone 2N (as highlighted) 2nd St
Level and Location for Diaphragm Wall at grid 02/AQ bewteen axis (02-1 , 02-2 ) Zone 2N (as highlighted
Surface preparation for mass concrete under ETFE PUMP ROOM S.O.G. zone 2D axis 02-J inner line (a
Concreting for central bridge abutment grid 01/M zone 4 (as highlighted)
Shuttering for central bridge abutment grid 01/M zone 4 (as highlighted)
Level and Location for central bridge abutment grid 01/M zone 4 (as highlighted)
Single layer of 4mm thick modified bituminous waterproofing membrane for Buttreess Bo 78 & 79 & 80 &
Protection layer of 4mm thick bituminous protection board for Buttreess Bo 78 & 79 & 80 & 81 from lev
Surface preparation & Base primer coating for Buttreess Bo 78 & 79 & 80 & 81 from level 870 to level 8
Inspection & Compaction tests of 4th Layer Backfilling (Sub-Grade) (Out of 5 layers) for Water Featu
Inspection & Compaction tests of 4th Layer Backfilling (Sub-Grade) (Out of 7 layers) Behind Boulders
Excavation and Soil preparation for Fountain 1, Along the wall (Inner Side) of Plant room, from Inside
Inspection & Compaction tests of 3rd (final) Layer Backfilling (Sub-Grade) (Out of 3 layers) Along the
Excavation and Bed preparation for Water Feature Lines (HDPE dia 110 mm) along the Pool, inside But
Excavation & Bed Preparation for Low Current Lines of Fire Alarm & Security lines (MH/WG/FA/26 to 3
Excavation & Bed Preparation for Electrical Lines of Low Voltage (MH/WG/LV/44 to 47) and Emergenc
Level and Location of blinding for mass concrete under ETFE PUMP ROOM S.O.G. zone 2D axis 02-J inn
Concreting for RC concrete ETFE PUMP ROOM S.O.G.. zone 2D axis 02-J inner line (as highlighted) at
Level and Location for RC concrete ETFE PUMP ROOM S.O.G.. zone 2D axis 02-J inner line (as highlig
Shuttering of blinding for mass concrete under ETFE PUMP ROOM S.O.G. zone 2D axis 02-J inner line
Shuttering for RC concrete ETFE PUMP ROOM S.O.G.. zone 2D axis 02-J inner line (as highlighted) at
Single layer 4mm thick modified bituminous waterproofing membrane for foundation & Kickers of Bou
Steel Reeinforcements for RC concrete ETFE PUMP ROOM S.O.G.. zone 2D axis 02-J inner line (as hig
Protection Layer of 4 mm Thk. Bitomenous Protection Board for Footings & Walls of Seat Wall (Inner) A
Anti termite under blinding for mass concrete under ETFE PUMP ROOM S.O.G. zone 2D axis 02-J inner l
Concreting for mass concrete under ETFE PUMP ROOM S.O.G. zone 2D axis 02-J inner line (as highlig
Concrete Pouring & Shuttering for Slab of Wet Well F, (at level +876.10), Inside Water Garden, as hig
Level and Location for plain concrete for internal foundation between axis 02-AB to 02-AZ zone 2R (
Steel Reinforcement for walls of New Ticketing Booth # 5A, As per Attached Highlighted Drawing's.
Steel Reinforcement of 1st floor slab and 1st floor beams for south small mosque zone 2B excluding stair
Level and Location of 1st floor slab and 1st floor beams for south small mosque zone 2B excluding stair
Shuttering of 1st floor slab and 1st floor beams for south small mosque zone 2B excluding stair landings
Steel Reinforcements for wall ( W1 & W2 )Up to ground floor level 869.10 at CAFETERIA zone 2A (as high
Steel Reinforcement for Beams (At level +872.35) of Boundary Wall @ Grid (28-29/M & R and 29-30/M-
Concrete Pouring & Shuttering for Beams (At level +872.35) of Boundary Wall @ Grid (21-28/M), at En
Coordinates & Levels for Beams (At level +872.35) of Boundary Wall @ Grid (21-28/M), at Energy Cente
Level and Location for Roof slab at MCPE 1 axis (03-S , 03-R) and (03/1 , 03/2) Zone 2M 2N (as high
Shuttering for Roof slab at MCPE 1 axis (03-S , 03-R) and (03/1 , 03/2) Zone 2M 2N (as highlighted)
Steel Reinforcements for wall at MCPE 1 axis 03/V, 03/1 to 03/2, 03/U, 03/1 to 03/2 Zone 2M 2N (as
Level and location for Infill inner wall at Crescent between axis (02-H & 02-G) (As highlighted) ZONE 2
Shuttering for Infill inner wall at Crescent between axis (02-H & 02-G) (As highlighted) ZONE 2C
Level and location for Infill inner wall BEAM at Crescent between axis (02-Z & 02-Y) (As highlighted)
Level and Location for Infill inner wall beam at Crescent between (02-K & 02-L) (As highlighted) ZONE
Steel Reinforcements for Infill wall between axis 02/AO to 02/AN (as highlighted), at CRESCENT Zone 2
Steel Reinforcements for Infill inner wall BEAM at Crescent between axis (02-Z & 02-Y) (As highlighte
Shuttering for Infill inner wall BEAM at Crescent between axis (02-Z & 02-Y) (As highlighted) ZONE 2H
Shuttering for Infill inner wall BEAM at Crescent between axis (02-W & 02-V) ) (As highlighted) ZONE 2
Level and Location for Infill inner wall BEAM at Crescent between axis (02-W & 02-V) ) (As highlighte
Steel Reinforcements for Infill inner wall BEAM at Crescent between axis (02-W & 02-V) ) (As highligh
Steel Reinforcements for Infill inner wall between (01-H & 01-I) 2nd Stage (As highlighted) ZONE 1C
Level and Location for Infill inner wall beams at Crescent between axis (02-O & 02-P) and (02-Q & 02-
Steel Reinforcements for Infill inner wall beam at Crescent between (02-K & 02-L) (As highlighted) ZO
Shuttering for Infill inner wall beams at Crescent between axis (02-O & 02-P) and (02-Q & 02-R) (As hi
Concreting for Infill wall (inner) axis 02-P to 02-Q (as highlighted) Zone 2E, at Crescent (2ND STAGE )
Shuttering for Infill inner wall beam at Crescent between (02-K & 02-L) (As highlighted) ZONE 2D
Concreting for Infill inner wall beam at Crescent between (02-K & 02-L) (As highlighted) ZONE 2D
Steel Reinforcements for Infill inner wall at Crescent between (02-R & 02-S) 1st Stage (As highlighted)
Installation of UPVC conduit (dia.75mm) Low Current Ductbank (Fiber Optic Cables) and connection
Steel Reinforcements for Infill inner wall at Crescent Boi 74-73 between (02-M & 02-L) (As highlighted)
Steel Reinforcements for Infill wall between axis 02/Q to 02/R (as highlighted), at CRESCENT Zone 2E
Installation of EMT Conduit (Dia. 3/4, 1 inch.) and Box (Ceiling Mounted) for Power (Twin Switch So
Installation of EMT Conduit (Dia. 3/4, 1 inch.) and Box (Ceiling Mounted) for Power (Twin Switch
Installation of EMT Conduit (Dia. 3/4, 1 inch.) for Power (Twin Switch Socket, Fused Connection U
Installation of straight PVC conduit (Dia. 25mm) and Box for Lighting (A/CE,CE,CD,CD/CE,C,G1/CE,CT,
Installation of straight UPVC Conduit (Dia. 75mm) LV Ductbank (Small Power & Normal Lighting) & E
Installation of PVC Conduit (Dia. 32mm) for Lighting (Lighting Fixtures) at the Boundary Wall (betwe
Installation of PVC Conduit (Dia. 25mm) and Box for Voice and Data System (CAM) at the New Ticket
Installation of PVC Conduit (Dia. 25mm) and Box for Security System (CAM & Card Reader) at the New
Installation of Straight PVC Conduit (Dia. 25mm) and Box for Voice Data (DATA & Telephone) at the N
Installation of Straight PVC Conduit (Dia. 25mm) and Box for Fire Alarm (Flash Beacon) at the North
Concreting for RING BEAM Zone 1N (INNER) Axis 01-1, 01AM to 01AP (as highlighted)
Excavation for Cretaceuos Garden zone 2D 2E (as highlighted)
Installed ETFE Cushions (without aluminum caps) between axis 02-AS/02AT.
Antitermitte of MCPE 3 for plinding under ground slab between axis 02-S, 03-1 to 02-2 , 03/B, 03-1 to 0
Installed ETFE Cushions (without aluminum caps) between axis 02-AR/02AS.
Installed ETFE Cushions (without aluminum caps) between axis 02-AM/02AN.
Installed ETFE Cushions (without aluminum caps) between axis 02-AO/02AP.
Installed ETFE Cushions (without aluminum caps) between axis 02-AP/02AQ.
Installed ETFE Cushions (without aluminum caps) between axis 02-AT/02AU.
Inspection of backfilling Gravel for the Duct Bank of Telecommunications Line from B/TL/36 and B/TL/35
Inspection and Compaction Test for backfilling sub-grade 1st Layer (1 of 2) beside Fire & Security Distr
Surface Preparation prior to start backfilling around Fire Water Line Pit for C/F/16, C/F/17 - as highlighte
Surface Preparation prior to start backfilling around Potable Water Line Pit for C/PW/06 - as highlighted.
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 2) beside MV Line from B/
Inspection Backfilling Gravel 1st layer ( 1 of 2 ) for Manhole MH-K-08 & MH-K-09 As Highlighted
Inspection and Compaction Test for backfilling sub-grade 2nd Layer ( 2 of 3 ) for storm water Line be
Inspection and Compaction Test for backfilling sub-grade 2nd Layer ( 2 of 3 ) for storm water Line b
Surface Preparation prior to start backfilling for Telecommunication Line Pit K/TL/10, K/TL/15, K/TL/19
Surface Preparation prior to start backfilling Fire&Security Line Pit K/FS/04, K/FS/09, K/FS/05 and K/FS
Inspection of Excavation for RO Water Line at Area-A &D - As highlighted
Inspection and Compaction Test for backfilling Sub-grade 6th Layer (6 of 7) around MV Line Pit F/MV/04
Inspection and Compaction Test for backfilling Sub-grade 4th Layer (4 of 6) for Storm Water Line fro
"Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 4) around MV Line Pit B/MV
INSPECTION FOR MANHOLE BASE INSTALLATION AND UPVC PIPE CONNECTION FOR - MH-K-09 (As Highli
Shutttering of MCPE 3 for plinding under ground slab between axis 02/S, 03-1 to 02-2 , 03/B, 03-1 to 02
Level and Location of MCPE 3 for Blinding under ground slab between axis 02/S, 03-1 to 02-2 , 03/B, 03-
Shuttering for Strip Footing between grid 01/L to 01/K zone 1D (as highlighted) at CRESCENT
Level and Location for Strip Footing between grid 01/L to 01/K zone 1D (as highlighted) at CRESCENT
Steel Reeinforcements for Strip Footing between grid 01/L to 01/K zone 1D (as highlighted) at CRESCEN
Protection layer of 4mm thick bituminous protection board for Diaphragm Wall footing axis 02-AR up to
Inspection and compaction test 1st and 2nd layer for Backfillinginside Cafeteria building btween Axis 0
Inspection and compaction test 13th layer Backfill for MCPE 3 Inner wall Axis 03A to 02S (as highlighted
Inspection and compaction test 7th and 8th layer for Backfilling at MCPE 2 wall inner axis AA-E (as hi
Inspection and compaction test 3rd layer for Backfilling strip footing at CRESCENT between PC 92-94 axi
Inspection and compaction test 5th and 6th layer Backfill for MCPE 2 Axis 02AB-02AD, Zone 2J (as highl
Inspection and compaction test 11th layer for Backfilling at MCPE 3 Axis 02P to 02S Zone 2E (as high
Pre insulated Chilled Water Pipes (S&R) 200mmØ&Pre insulated Heat Water Pipes (S&R) 150 mmØ( layi
Inspection and compaction test 1st and 2nd layer Mockup soil permability at crescent internal garden (
Inspection Of Pipe Installation For Non-Potable Water (Irrigation Main Line); (200 mmØ- UPVC-Claas-
Inspection and compaction test 5th and 6th layer Backfill at cafeteria W33 Axis 02D - 02E, Zone 2B (as
Installed ETFE Cushions (without aluminum caps) between axis 02-AM/02AN.
Installed ETFE Cushions (without aluminum caps) between axis 02-AW/02AX.
Installed ETFE Cushions (without aluminum caps) between axis 02-AQ/02AR.
Installed ETFE Cushions (without aluminum caps) between axis 02-AU/02AV.
Installed ETFE Cushions (without aluminum caps) between axis 02-AV/02AW.
Installed ETFE Cushions (without aluminum caps) between axis 02-AN/02AO.
Steel Reeinforcements for RC Foundation at MCPE1 axis 03R,03/2 to 03/1 zone 2M 2N (as highlighted)
'Bedding of Gravel 3/8" and Geotextile surrounding in pipes (dia 450 mm Ø- UPVC Pipes-Class 4 ) f
"Inspection for Casting the Concrete Encasement and Surface Preperation prior to start waterproofing
Rough Coat (Spatter Dash) Prior to Plastering of Internal Wall (from Ware House Side) at Grid (R/1-2)
Steel Reinforcement for Columns (above the level +872.35) of Boundary Wall @ Grid (R/22-28), at Ene
Concrete Pouring & Shuttering for Columns (above the level +872.35) of Boundary Wall @ Grid (R/18-2
Coordinates & Levels for Columns (above the level +872.35) of Boundary Wall @ Grid (R/18-22), at Ene
Coordinates & Levels for Slab of Wet Well F, (at level +876.10), Inside Water Garden, as highlighted a
Inspection & Compaction tests of 2nd (Final) Layer (Sub-Grade) Backfilling (Out of 2 layers) Under
Inspection & Compaction tests of 1st Layer (Sub-Grade) Backfilling (Out of 2 layers) for Low Current
Inspection & Compaction tests of 1st Layer (Sub-Grade) Backfilling (Out of 2 layers) for Electrical
Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Grade) (Out of 7 layers) at (Inner side) o
Sand Cover & Protection for Electrical Lines of Low Voltage (MH/WG/LV/17 to 21) and Emergency lin
Shuttering for RC Foundation at MCPE 1 axis 03R,03/2 to 03/1 zone 2M 2N (as highlighted)
Concreting for RC Foundation at MCPE 1 axis 03AP- 03/2,03/1,02/2 zone 2M 2N (as highlighted)
Steel Reinforcements for abutment wall at CENTRAL BRIDGE zone 4 grid 01/M (as highlighted)
Surface Preparation Prior to Start Backfill Gravel for Manhole MH-K-08 & MH-K-09 As Highlighted
Inspection and Compaction Test for backfilling sub-grade 1st Layer ( 1 of 3 ) for storm water Line be
Inspection and Compaction Test for backfilling sub-grade 1st Layer ( 1 of 3 ) for storm water Line be
Level and Location for Large Mosque walls from S.O.G to the bottom of lower first slab ,Zone 1G (as hig
Inspection of Waterproofing and Application of Primer (1st Coat, 2nd Coat and 3rd Coat) for B/MV/10
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 1) above Red Tiles for MV Li
"Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 4) for the Duct Bank of MV
Inspection of Steel Reinforcement for the Footing and Walls of SBC-07 - As Highlighted
Steel Reeinforcements for internal foundation RC at CRESCENT between axis 02-BB & 02-AZ Zone 2R (a
Surface Preparation prior to start water proofing for MV Line Pit B/MV/10, and G/MV/28 at Zone-B and
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 6) for Storm Water Line from
Steel Reinforcement for Columns of Boundary Wall @ Grid (A/6-12B), at Energy Center 2, as highlight
Sand Bedding for Water Feature Lines (HDPE dia 250 & 200 mm) from Water play garden to Fountain o
Steel Reinforcement for Beams (At level +872.35) of Boundary Wall @ Grid (21-28/M), at Energy Cente
Steel Reinforcement for Slab of Wet Well F, (at level +876.10), Inside Water Garden, as highlighted a
Steel Reinforcement for Footings & Kickers of Cabin Room, ETFE Pump Room, Water feature Pump Roo
3rd Coat Cementitious Water proofing for Footings top & Walls of Seat Walls (Inner) All sides, Inside
Concrete Pouring & Shuttering for Lintels of Doors & Block work & Stiffner Column's for all walls of Lad
Excavation for Wadi-03 (Left Side) upto excavation level as per the approved shop drawing KAIG3-SD-S
NGL for Disposal Material in Wadi-03 (Right Side) as per attached data.
"Inspection and Compaction Test for backfilling Sub-Grade 2nd Layer (2 of 4) for Telecommunication Lin
INSPECTION FOR MANHOLE BASE INSTALLATION AND UPVC PIPE CONNECTION FOR - MH-M-02 and MH-M-
INSPECTION OF INSTALLATION OF ALL RINGS (RAISER) AND SLAB FOR MH-M-02 and MH-M-05 (AS ATTA
Inspection for Casting the Concrete encasement and Surface Preperation prior to start waterproofing
"Inspection and Compaction Test for backfilling Sub-Grade 2nd Layer (2 of 4) for Fire & Security Line Pi
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 4) for the Duct Bank of MV
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 2) above Sand Covering for No
Inspection and Compaction Test for backfilling Sub-grade 4th Layer (4 of 7) around MV Line Pit K/MV/0
Inspection and Compaction Test for backfilling Sub-grade 5th Layer (5 of 7) around MV Line Pit F/MV/11
Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 6) for Storm Water Line fro
Inspection of Excavation for MV Line from C/MV/30 to C/MV/03 including Pit - C/MV/03 at Zone-C - as h
Inspection of Excavation for RO Water Line at Area-B - As highlighted
"INSPECTION FOR INSTALLATION OF STORM WATER LINE GULLIES G-O-45, G-O-32, G-O-34 - as highligh
Inspection for Casting the Blinding Concrete under the Gully for G-O-32, G-O-34 (as Highlighted)
Inspection of Concrete Pouring for Footing of MV Line Pulling Pit - G/MV/13 and G/MV/38 at Zone-G (
Inspection of Formwork for Footing of MV Line Pulling Pit - G/MV/13, G/MV/38 at Zone-G (As Highligh
Inspection of Steel Reinforcement for Footing and wall of MV Line Pulling Pit - G/MV/13, G/MV/38 at
Inspection of Surface preparation prior to start Waterproofing and Waterproofing , Application of Pri
Inspection of Waterproofing and Application of Primer (1st Coat, 2nd Coat and 3rd Coat) for C/MV/3
"INSPECTION FOR INSTALLATION OF ALL RINGS (RISER) AND SLAB FOR MH-M-03 (As Highlighted) "
Steel Reinforcements for internal columns and wall of NORTH ADMINSTRATION axis 02/BC, 02/1-02/2
Concreting for RING BEAM Zone 1N (OUTER) Axis 01-2, 01AM to 01AP (as highlighted)
Concreting for RING BEAM Zone 1H (INNER) Axis 01Z TO 01Y (as highlighted)
Pipe Sleeve Installation Mechanical for first floor At (South Small Mosque Crescent 2) ; (UPVC Pi
Protection layer of 4mm thick bituminous protection board for MCPE 2 wall and counterfort ( inner )
Single layer of 4mm thick modified bituminous waterproofing membrane for Diaphragm Wall axis 02-AR u
150mm Gravel 3/4 for Mockup soil permability at crescent internal garden (as Highlighted) Zone 2L
Inspection and compaction test 10th layer for Backfilling for Infill Wall at Tip (as highlighted) Zone 2R
Inspection and compaction test 3rd and 4th layer Backfill at cafeteria W33 Axis 02D - 02E, Zone 2B (as
Inspection and compaction test 3rd and 4th layer Backfill ffor MCPE 2 Axis 02AB-02AD, Zone 2J (as high
Inspection and compaction test 7th & 8th layer for Backfilling for Infill Wall at Tip (as highlighted)
Inspection and compaction test 1st & 2nd layer for Backfilling for Infill Wall at Tip (as highlighted) Zo
'Pipe Installation of Strom Water pipe OUT FALL-O for (315 mm Ø- UPVC Pipes-Class 4 ) for Storm
Shuttering for wall at MCPE 1 axis 03R, 03/1 to 03/2 Zone 2M 2N (as highlighted)
'Bedding of Gravel 3/8" and Geotextile surrounding in pipes (315 mm Ø- UPVC Pipes-Class 4 ) for
Level and Location for wall at MCPE 1 axis 03R, 03/1 to 03/2 Zone 2M 2N (as highlighted)
Shuttering for Infill wall (inner) at Crescent from 02-P to 02-Q (as highlighted) Zone 2E (2ND STAGE )
Steel Reinforcements for Infill inner wall at Crescent between (02-H & 02-G) (As highlighted) ZONE 2C
Level and Location for Infill wall (inner) from 02-P to 02-Q (as highlighted) Zone 2E (2ND STAGE )
"Shuttering for Infill wall for 2 infill walls Buttress 71 axis ( 02/J ) & Butterss 72 axis ( 02/K ) (as highligh
Inspection of Excavation for Heating and Chilled Water Line at Zone-G&K - As highlighted
Inspection of Sand bedding under pipe for Heating and Chilled Water Line at Zone-B - As highlighted (St
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 2) above Sand Covering for No
Surface preparation & Base primer coating for Diaphragm Wall axis 02-AR up to the top of footing (as
Inspection Of Pipe Installation For Irrigation ROW mainline Including Branches; (200mmØ- UPVC-Claa
Inspection Of Pipe Installation For Irrigation ROW mainline Including Branches; (200mmØ- UPVC-Claa
Surface preparation & Base primer coating for CHILD CARE for TOP of foundation & cloumns UPTO SO
Inspection Of Pipe Installation For Non-Potable Water (Irrigation Line); (200 mmØ- UPVC-Claas-5 ) I
Protection layer of 4mm thick bituminous protection board for CHILD CARE for TOP of foundation &
Two layer of 4mm thick modified bituminous waterproofing membrane for CHILD CARE for TOP of fou
Surface Preparation prior to backfilling inside Cafeteria building W10 and W11 btween Axis 02B - 02C z
Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 7) around MV Line Pit K/MV/0
Inspection and Compaction Test for backfilling Sub-grade 4th Layer (4 of 7) around MV Line Pit F/MV/11
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 7) around MV Line Pit G/MV
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 6) for Storm Water Line fro
INSPECTION FOR INSTALLATION OF STORM WATER LINE GULLY G-O-28 - as highlighted
Inspection for Casting the Blinding Concrete under the Gully for G-O-45 (as Highlighted)
Surface Preparation Prior to Start Backfilling Gravel For Manholes MH-O-01, MH-O-02, MH-O-03, MH-
Inspection for Blinding Concrete under Non-Potable Water Line Isolation Pit for POC-39, POC-41, POC-
Inspection of Concrete Pouring for Wall of MV Line Pulling Pit - G/MV/37 H/MV/28, H/MV/11 and H/MV
Inspection of Formwork for Wall of MV Line Pulling Pit - G/MV/37, H/MV/28, H/MV/11 and H/MV/24 at
Inspection for casting concrete for short piece and Surface Preperation prior to start waterproofing fo
"Surface Preparation prior to start backfilling for Telecommunication Line Pit F/TL/03, F/TL/04, F/TL/
Bolt Tightening Inspection of Crescent 01, Zone 3 - 1G from Axis 01S to 01W (as per the highlighted a
Preliminary Inspection of Erected Steel in Crescent 01, Zone 2 1H from Axis 01W to 01AA (as per the
Installation of UPVC Conduit Sleevs (Dia. 75mm) for Low Current Ductbank and Connection to Han
Installation of UPVC Conduit (Dia. 75mm) for Low Voltage Ductbank from (MH/WG/LV/28 to MH/WG/L
Installation of UPVC Conduit (Dia. 75mm) for Low Voltage Ductbank and Connection to Handhole
Inspection Of Pipe Installation For Non-Potable Water (Irrigation Line); (200,160,110&50 mmØ- UPVC
'Warning Tape Pipe Installation For Non-Potable Water (Irrigation Line ); (315mmØ- UPVC-Claas-5 );
'Pipe Installation of Strom Water pipe OUT FALL-O for ( Dia315&400mm Ø- UPVC Pipes-Class 4 )
'Bedding of Gravel 3/8" and Geotextile surrounding in pipes ( Dia315&400mm Ø- UPVC Pipes-Class 4
Installation of Straight PVC Conduit (Dia. 25mm) and Box for Fire Alarm (Speaker) at Infill Wall Axis
Installation of UPVC conduit (dia.75mm) Low Current Ductbank (Fiber Optic Cables) and connection
Inspection & Compaction tests of 1st Layer (Sub-Grade) Backfilling (Out of 2 layers) Under Water Fo
Excavation and Bed preparation for Water Feature Lines (HDPE dia 250 & 200 mm) from Water play ga
Sand Bedding for Irrigation Lines (63 dia.) from Outer Canopy 1 to Outer Canopy 3 (Outer side), at Ph
Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Grade) (Out of 5 layers) for Water Featu
Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Grade) (Out of 7 layers) Behind Boulders
Sand Bedding for Water Feature Lines (90mm Supply and 160mm Drain pipes) At Fountain 3, inside Phy
Surface preparation prior to Plastering for Column's (6 no's) of Pargola, at Grid (G & P/3, 4 & 5),
2nd Coat Cementitious Water proofing for Footings top & Walls of Seat Walls (Inner) All sides, Inside
Inspection of Plastering for Exterior Elevations ( All sides) of Public Toilet # 3, At highlighted area in
Coordinates & Levels for Footing of Boundary Wall @ Grid (J-L/0-4 & L/4-6), at Energy Center 2, as hi
2nd Coat Damp proofing for Footings & Walls of Seat Walls (08 no's) All Sides, inside Butterfly Garden
Steel Reinforcement for Columns (above the level +872.35) of Boundary Wall @ Grid (R/18-22), at Ene
Concrete pouring & Shuttering for Footing of Boundary Wall @ Grid (J-L/0-4 & L/4-6), at Energy Center
Steel Reinforcement for Footing of Boundary Wall @ Grid (J-L/0-4 & L/4-6), at Energy Center 2, as hig
Notification to start laying of lower membrane (EPDM) at DEVONIAN GARDEN zone 2M (as highlighted)
Inspection and compaction test 2nd layer for backfilling for Childcare Zone 2N (as highlighted) (2nd of
Inspection and compaction test 1st and 2nd layer Backfilling strip footing at CRESCENT between PC 22-2
Inspection and compaction test 1st and 2nd layer for Backfilling strip footing at CRESCENT between PC
Surface preparation & Base primer coating for retaining wall axis 01-AR TO 01-AU from level 866.5 to
Protection layer of 4mm thick bituminous protection board for retaining wall axis 01-R TO 01-AU from
Surface preparation & Base primer coating for RC foundations and walls up to level 863.45 from axis 0
Two coat of bituminous damp proofing coating for RC foundations and walls up to level 863.45 from ax
Protection layer of 4mm thick bituminous protection board under Strip Footing from axis 02B to 02A at
Single layer of 4mm thick modified bituminous waterproofing membrane under Strip Footing from axis
Surface preparation & Base primer coating under Strip Footing from axis 02B to 02A at CRESCENT (as
Protection layer of 4mm thick bituminous protection board for RC foundations and walls up to level 8
Excavation and Bed preparation for Water Feature Lines (90mm Supply and 160mm Drain pipes) At Foun
Inspection & Compaction tests of 5th (Final) Layer Backfilling (Sub-Grade) (Out of 5 layers) along Fo
1st Coat Cementitious Water proofing for Footings top & Walls of Seat Walls (Inner) All sides, Inside
Plastering for All Internal walls of Gents Toilets (All Sides) Inside Public Toilet # 2, At highlighted are
Two layer of 4mm thick modified bituminous waterproofing membrane for retaining wall axis 01-R TO 0
Solvent Base Primer Coating prior to Membrane waterproofing for foundation & Kickers of Boundary w
1st Coat Damp proofing for Footings & Walls of Seat Walls (08 no's) All Sides, inside Butterfly Garden,
Antitermitte for MCPE 3 plinding under ground foundation at axis 02-P, 03-2 to 03-1 , LEVEL 870.35 Zon
Concrete Pouring & Shuttering for Footings & Garde Beams @ Grid (9-12B/D-H), Inside Energy Center 2
Level and Location for MCPE 3 plinding under ground foundation at axis 02-P, 03-2 to 03-1 , LEVEL 870.
Shuttering for MCPE 3 plinding under ground foundation at axis 02-P, 03-2 to 03-1 , LEVEL 870.35 Zone
Grouting of Installed Anchor bolt and under Baseplate at Zone 1G inner ring beam (as highlighted) usi
"Shuttering for Infill wall INNER grid 02-AC to 02-AD (as highlighted) Zone 2J "
"Level and Location for Infill wall INNER grid 02-AC to 02-AD (as highlighted) Zone 2J "
"Concreting for Infill wall INNER grid 02-AC to 02-AD (as highlighted) Zone 2J "
Steel Reeinforcements for Retaining Wall at Grid 01/B to 01/A level 866.10 Zone 6 & 7 as highlighted
Level and Location for Retaining Wall at Grid 02-O to 02-M level 865.95 & 865.70 Zone 6 &7 as highli
Level and Location for Retaining Wall at Grid 01/B to 01/A level 866.10 Zone 6 & 7 as highlighted at C
Steel Reinforcements for beams(B2, B4, S1) at CAFETERIA zone 2A (as highlighted) KAIG3-SCR-CF-S-015
Surface Preparation Prior to start Backfilling strip footing at CRESCENT between PC 92-94 axis 02A - 02
Surface Preparation Prior to start Backfilling strip footing at CRESCENT between PC 22-24 Axis 01/L - 01
Shuttering for Infill outer wall between (01H & 01G) (As highlighted) ZONE 1C
"Concreting for Infill wall for 2 infill walls Buttress 71 axis ( 02/J ) & Butterss 72 axis ( 02/K ) (as highlig
Steel Reinforcements for Infill inner wall between (02-R & 02Q) (As highlighted) ZONE 2E (2nd STAGE )
"Level and location for Infill wall for 2 infill walls Buttress 71 axis ( 02/J ) & Butterss 72 axis ( 02/K ) (as
Level and Location for Infill outer wall between (01H & 01G) (As highlighted) ZONE 1C
Steel Reeinforcements for RC Foundation at MCPE1 axis 03AP- 03/2,03/1,02/2 zone 2M 2N (as highligh
Shuttering for RC Foundation at MCPE1 axis 03AP- 03/2,03/1,02/2 zone 2M 2N (as highlighted)
Shuttering for internal foundation RC between axis 02-BB & 02-AZ at CRESCENT Zone 2R (as highlighted
Preliminary Inspection of Erected Steel in Crescent 02, Zone 3 2N as per the highlighted area in atta
Inspection of Alignment for the remaining Baseplates in Crescent 02 Zone 6 - 2F Outer.
Inspection of Alignment for the Installed Baseplates in Crescent 01 Zone 1 - 1N Outer & Inner.
Inspection of Installation and Alignment of Column in Partition Wall Crescent 02 Zone 3 2N Axis 02AR
Inspection for Casting Blinding Concrete under Manhole - MH-M-02, MH-M-05 - as highlighted
Inspection of Sand Bedding under pipe for Heating and Chilled Water Line between AV-10 and G/DC/20 a
Excavation for Fire Water Line at Zone-G - as highlighted
Excavation for Potable Water Line at Zone-G - as highlighted
Inspection of Sand Covering to protect the pipe for Non-Potable Water Line at Zone- F - as highlighted
Inspection and Compaction Test for backfilling Sub-grade 5th Layer (5 of 7) around MV Line Pit B/MV
Protection layer of Geotex and 50mm Screed under bottom slab of duct tunnel at MCPE1 axis 03-2 to 02
Two layer of 4mm thick modified bituminous waterproofing membrane under bottom slab of duct tunne
Surface preparation and Base primer coating under bottom slab of duct tunnel at MCPE1 axis 03-2 , 02-2
Surface preparation and Base primer coating under RC foundation at MCPE1 Axis 03-1 to 03-2 Zone 2M
Inspection and Compaction Test for backfilling Sub-grade 6th Layer (6 of 7) around MV Line Pit F/MV/09
Two layer of 4mm thick modified bituminous waterproofing membrane under RC foundation at MCPE1 Axi
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 4) for the Duct Bank of MV L
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 7) around MV Line Pit K/MV/0
Inspection of Sand Bedding under pipe for Heating and Chilled Water Line between G/DH/19 and G/DH/1
Inspection for casting concrete for short piece and Surface Preperation prior to start waterproofin
Inspection of Sand Bedding under pipe for Heating and Chilled Water Line at Zone-G - As highlighted (St
Inspection of Sand Bedding under pipe for Heating and Chilled Water Line between G/DC/13 and B/DC/0
Surface Preparation prior to start Waterproofing for Cesspool-2 - as highlighted
'Potable Water Pipes Sand Cover & Pipes Protection (30 cm above Pipes). As per highlighted Area in
'Fire Fighting Networks Sand Cover & Pipes Protection (30 cm above Pipes) (Red Line). As per highlig
Installation and fixation steel structures for picnic area units 10,11,12,13,14,15,16,17
Inspection and compaction test 1st and 2nd layer Backfill at cafeteria W33 Axis 02D - 02E, Zone 2B (as
Inspection and compaction test 1st and 2nd layer Backfill ffor MCPE 2 Axis 02AB-02AD, Zone 2J (as high
Steel Reinforcements for wall at MCPE 1 axis 03R, 03/1 to 03/2 Zone 2M 2N from level 781 to 875.85
Grouting of Installed Anchor bolt and under Baseplate at Zone 1N inner and outer ring beam (as highli
Grouting of Installed Anchor bolt and under Baseplate at Zone 1F inner and outer ring beam (as high
Grouting of Installed Anchor bolt and under Baseplate at Zone 1M outer ring beam (as highlighted) usi
Installation of Weatherproof Box(2pcs.) and straight PVC conduit 25mm (1pcs.) each column for C
Grouting of Installed Anchor bolt and under Baseplate at Zone 1M inner ring beam (as highlighted) usi
Surface preparation & Base primer coating for Tip up to level 868.90 at Crescent Zone 1A axis 01/A - 0
Tow coat of bituminous damp proofing coating for RC foundation and wall 33 at Cafeteria from level 86
Surface preparation & Base primer coating for RC foundation and wall 33 at Cafeteria from level 863.00
Geotextile sheet & Screed Protection for under Strip Footing between PC 21-22-25 axis 01-M TO 01-K
Single layer of 4mm thick modified bituminous waterproofing membrane for under Strip Footing betwe
Surface preparation & Base primer coating for under Strip Footing between PC 21-22-25 axis 01-M TO
Surface preparation & Base primer coating for RF12 foundation at CRESCENT (as highlighted) Zone 1N
Two coat of bituminous damp proofing coating for RF12 foundation at CRESCENT (as highlighted) Zone
Protection layer of 4mm thick bituminous protection board for RF12 foundation at CRESCENT (as highl
Stone Cladding for Boundary Walls (Inner & outer faces) @ Span 50B, 51, 52, 53, 54 and 55 and Colum
Installation and Fixation of Anchor Bolts and Check Coordinates & Level for Pargola at Grid (G & P/3
Excavation & Bed preparation for Irrigation Lines (63 dia.) from Outer Canopy 1 to Outer Canopy 3 (Ou
Coordinates & Levels for Footings & Garde Beams @ Grid (9-12B/D-H), Inside Energy Center 2, as high
Coordinates & Levels for Beams of Jetty 1 & Jetty 2 at Boat Garden inside Water Garden , as highligh
Primer Coating Prior to Damp proofing for Footings & Walls of Seat Walls (08 no's) All Sides, inside Bu
Steel Reinforcement for Footings & Garde Beams @ Grid (9-12B/D-H), Inside Energy Center 2, as highl
Surface preparation prior to waterproofing for foundation & Kickers of Boundary wall (Inner & Outer
2nd Coat Damp Proofing for Footings & Walls of Seat Wall (Inner) All sides, Inside Physic garden, as h
Steel Reinforcements for Promenade Bridge Deck Zone 1E, Axis 01M - 01P (as highlighted)
INSPECTION FOR MANHOLE BASE INSTALLATION AND UPVC PIPE CONNECTION FOR - FW-A-3-6 (As Highli
Inspection for Casting the Blinding Concrete under the Foul Water Line Manhole FW-A-4 (as Highlighted
Installation of Main Fire Water Pipes (250mmØ-UPVC-Class-5) From Pit (C/F/05) to Pit (C/F/11) Incl
Inspection of Excavation for Heating and Chilled Water Line at Zone-B&G - As highlighted
Inspection of Excavation for Foul Water Line branch at Zone-6B near FW-A-3-7.3 - as Highlighted
Installation of Main Potable Water Pipes (200mmØ-UPVC-Class-5) at Zone C- From Pit (C/PW/02) to P
Inspection of Excavation for Storm Water Line at Zone-6B near MH-K-09 - As highlighted
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 7) around MV Line Pit G/MV
Inspection and Compaction Test for backfilling Sub-grade 6th Layer (6 of 7) around MV Line Pit F/MV/09
Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 7) around MV Line Pit F/MV/11
"Inspection for Installation of MV Line Junction Pit - F/MV/01 - as highlighted "
"Inspection for Blinding Concrete under MV Line Pulling Pit G/MV/13 and G/MV/38 - as highlighted (
Inspection of Concrete Pouring for Side Walls of MV Line Pulling Pit - L/MV/15 , L/MV/02 and L/MV/17 a
Inspection of Formwork for Side Walls of MV Line Pulling Pit - L/MV/15 , L/MV/02 and L/MV/17 at Zone-L
'Pipe Installation of Strom Water pipe OUT FALL-M for (dia 450 mm Ø- UPVC Pipes-Class 4 ) for St
Inspection of backfilling Gravel 1st layer (1 of 1) for foul water line manhole FW-A-6 at Zone-6A - As Hig
'Bedding of Gravel 3/8" and Geotextile surrounding in pipes (dia 450 mm Ø- UPVC Pipes-Class 4 ) fo
Level and Location for (MCPE 1) wall and counterfort from level 871 to 875.55 between axis 03-T to 02
Protection layer of 4mm thick bituminous protection board for Tip up to level 868.90 at Crescent Zone
Single layer of 4mm thick modified bituminous waterproofing membrane for Tip up to level 868.90 at Cr
Surface preparation & Base primer coating for 3 span wall inner at MCPE 2 axis 02/AB to 02/AD (as hi
Installation of PVC conduit (dia.75mm) Low Current Ductbank (Fire and Security) and connectio
Installation of straight PVC conduit (Dia. 75mm) Low Voltage Ductbank (Emergency) and connec
Shuttering for (MCPE 1) wall and counterfort from level 871 to 875.55 between axis 03-T to 02-AM at
Two layer of 4mm thick modified bituminous waterproofing membrane for 3 span wall inner at MCPE 2 a
Installation of EMT Conduit (Dia. 3/4) and Box for Fire Alarm (Speaker, Flashing Beacon, Break Gl
Steel Reinforcements for Infill outer wall between (02-AB & 02-AA) (As highlighted) ZONE 2H
Installation of EMT Conduit (Dia. 3/4) and Box for Fire Alarm (Speaker, Flashing Beacon, Break Gl
Concreting for (MCPE 1) wall and counterfort from level 871 to 875.55 between axis 03-T to 02-AM at
Two layer of 4mm thick modified bituminous waterproofing membrane for SOUTH WATCH TOWER level 8
Protection layer of 4mm thick bituminous protection board for 3 span wall inner at MCPE 2 axis 02/AB t
Installation of Anchor Bolts and Check Co-ordinates and Levels for Canopy Foundation for Seating Area-1
Inspection of Casting the Concrete Encasement and Surface Preperation prior to start waterproofing
Shuttering for Infill wall (INNER) axis 02/O to 02/P (as highlighted) Zone 2E (2nd STAGE )
Concreting for RING BEAM Zone 2F (OUTER) Axis 02-2, 02T to 02U (as highlighted)
Steel Reinforcements for Infill wall between BII BIV 107-108-109 between Gridline 02-1 AL - 02-1 AM -
"Inspection and Compaction Test for backfilling Sub-Grade 1st Layer (1 of 4) for Telecommunication Line
Inspection for Laying of GreenTiles above the pipe for Fire & Security Distribution Line from F/FS/08 to
Inspection for Laying of Green Tiles above the pipe for Telecommunication Line from K/TL/11 to K/TL/22
"Inspection of Concrete Pouring for Slab of MV Line Pulling Pit - G/MV/02, H/MV/25, H/MV/02, H/MV
"Inspection and Compaction Test for backfilling Sub-Grade 1st Layer (1 of 4) for Fire & Security Line Pi
Inspection and Compaction Test for backfilling Sub-grade 4th Layer (4 of 7) around MV Line Pit B/MV
Inspection and Compaction Test for backfilling Sub-grade 5th Layer (5 of 7) around MV Line Pit F/MV/09
Surface Preparation prior to start backfill for the Duct Bank of MV Line between F/MV/01 to F/MV/09 at
"Inspection of Formwork for Slab of MV Line Pulling Pit - G/MV/02, H/MV/25, H/MV/02, H/MV/04, H/
Inspection of Thrust Block for Irrigation ROW Sub-mainline Including Branches; (90&50mmØ- UPVC-Cla
"Inspection of Steel Reinforcement for Slab of MV Line Pulling Pit - G/MV/02, H/MV/25, H/MV/02,
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 7 layers) Behind Boulders
"INSPECTION FOR INSTALLATION OF ALL RINGS (RISER) AND SLAB FOR MH-O-08-01, MH-O-10 (As Highlig
INSPECTION FOR MANHOLE BASE INSTALLATION AND UPVC PIPE CONNECTION FOR - MH-O-08-01, MH-O-0
Inspection of Thrust Block for Irrigation lines Submain Line Including Branches (110mmØ & 50mmØ -
Inspection of Sand bedding under pipe for Heating and Chilled Water Line at Zone-B - As highlighted (St
Inspection for Blinding Concrete under Storm Box Culvert - SBC-07 including Wing Wall - As Highlighted
Surface Preparation & Compaction Tests of Existing fill Material for Electrical Lines of Low Voltag
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 3 layers) Along the wall (I
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 5 layers) for Water Featu
Surface Preparation Prior to Water proofing for Footings & Walls of Seat Walls (08 no's) All Sides, ins
1st Coat Damp Proofing for Footings & Walls of Seat Wall (Inner) All sides, Inside Physic garden, as h
Concrete Pouring & Shuttering for Beams of Jetty 1 & Jetty 2 at Boat Garden inside Water Garden , as
Excavation for retaining wall between axis 02/O to axis 02/M as highlighted Zone 6 & 7 (as highlighted)
Plaster Guide Points & Accessories for Plastering of Parapet wall (from Internal Side) at Grid (3/A-E
Concrete Pouring for Blinding Under Low Current Handholes (MH/WG/LC/01 & 04) and Fire Alarm & S
Concrete Pouring & Shuttering for Concrete Pad on Foundation of Wet Well E, Inside Water Garden a
Surface Preparation Prior to start backfilling at Cafeteria W33 Axis 02D - 02E, Zone 2B (as highlighted)
Inspection and compaction test 9th layer for Backfilling for Infill Wall at Tip (as highlighted) Zone 2R (
"Inspection and compaction test 10th layer (Subgrade) for backfilling for MCPE 3 (S.O.G) axis 02 P to 02 S
"Inspection and compaction test 10th and 11th layer (Subgrade) for backfilling for MCPE 3 (S.O.G) axis 02
Inspection and compaction test 9th & 10th layer for Backfilling at MCPE 3 Axis 02P to 02S Zone 2E (
Level and location for walls & Two columns at Large Mosque, Axis A,3-4 to B,3-4 zone 1G (as highlighted
Shuttering for walls & Two columns at Large Mosque, Axis A,3-4 to B,3-4 zone 1G (as highlighted)
"Steel Reinforcements for Infill wall OUTER KICKER between axis 01-G to 01-F (as highlighted) Zone 2B
Shuttering for plain concrete for internal foundation between axis 02-AB to 02-AZ zone 2R (as highli
Antitermite for plain concrete for internal foundation between axis 02-AB to 02-AZ zone 2R (as high
"Level and Location for Infill wall OUTER KICKER between axis 01-G to 01-F (as highlighted) Zone 2B , a
"Shuttering for Infill wall OUTER KICKER between axis 01-G to 01-F (as highlighted) Zone 2B , at CRESCE
Protection layer of 4mm thick bituminous protection board for SOUTH WATCH TOWER level 858.90 (as
Protection layer of Geotex and 50mmScreed Under Strip Footing between PC 44-46 (as highlighted) Zon
Level and Location for internal foundation RC between axis 02-BB & 02-AZ Zone 2R (as highlighted)
Level and location for RC Foundation axis 03AP- 03/2,03/1,02/2 zone 2M 2N (as highlighted)
Level and Location for Infill wall between axis 02/AM to 02/AL(as highlighted) Zone 2M
Concreting for Infill wall between axis 02/AM to 02/AL(as highlighted) Zone 2M
Shuttering for Infill wall between axis 02/AM to 02/AL(as highlighted) Zone 2M
Plaster Guide Points & Accessories for Plastering of Internal Wall (from Ware House Side) at Grid (R/
Inspection & Compaction tests of 4th Layer Backfilling (Sub-Grade) (Out of 6 layers) along Foundation
Warning Tiles & Tape for Low Current Lines of Telecom (from MH/SG/TC/1-2-3-4-5 to 6) and Fire Alar
Warning Tiles & Tape for Electrical Lines of Low Voltage (from MH/SG/LV/6-4 to 5) and Emergency (f
Sand Bedding for Electrical Lines of Low Voltage (MH/WG/LV/09 to 16 & Pulling pit to LV/10) and E
Concrete Pouring for Blinding Under Electrical Handholes of Emergency (MH/WG/EM/01, 03, 04, 05 &
Concrete Pouring & Shuttering for Concrete Pad on Foundation of Wet Well F, Inside Water Garden a
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 4) above Sand Covering to pro
Installation of UPVC conduit (110mm dia.) Low Current Ductbank (Fire and Security) in between hand
Installation of UPVC conduit (110mm dia.) Low Current Ductbank (TELECOM) in between handhole Duct
Installation of straight PVC conduit (Dia 32mm) and Box for Lighting (B2 & B2/CE) at the Physic Garden
Installation of EMT Conduit (Dia. 3/4) for Power (Twin Switch Socket, Fused Connection Unit & Co
Installation of Cable Trunking (UPS , LTG & SP ) at Management and Maintenance Bldg. GF 5000C Pas
"Inspection and Compaction Test for backfilling Sub-Grade 1st Layer (1 of 4) for Fire & Security Line Pit
"Inspection and Compaction Test for backfilling Sub-Grade 1st Layer (1 of 4) for Telecommunication Line
"INSPECTION FOR INSTALLATION OF STORM WATER LINE GULLIES G-O-07, G-O-08, G-O-09, G-O-18, G-O-19
Inspection of Water Proofing and Surface Preparation prior to start backfilling for Duct Bank of Fire&S
Inspection and Compaction Test for backfilling Sub-grade 4th Layer (4 of 7) around MV Line Pit F/MV/09
"Inspection for Casting the Blinding Concrete under the Manhole for FW-A-3-5 , FW-A-3-6 (as Highlighte
INSPECTION FOR MANHOLE BASE INSTALLATION AND UPVC PIPE CONNECTION FOR - MH-M-03 (As Highli
Inspection of Sand bedding under pipe for Non-Potable Water Line at Zone-B - As highlighted (Stock Pil
Inspection of Sand Bedding under pipe for Heating and Chilled Water Line between AV-14 and G/DH/19 a
Inspection for the Excavation of Storm Box Culvert - SBC-07 (As Highlighted)
Inspectionand Compaction Test for backfilling Sub-grade 1st Layer (1 of 1) above Red Tiles for MV Li
Inspection of Sand bedding under pipe for Non-Potable Water Line at Zone-B - As highlighted (Stock Pil
Inspection for Laying of Red Tiles above the pipe for MV Line from G/MV/19 to G/MV/11 at Zone-G - as
Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 4) for the Duct Bank of MV L
Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 7) around MV Line Pit F/MV/09
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 7) around MV Line Pit K/MV/01
"Inspection and Compaction test for backfilling sub-grade 4th Layer (4 of 4) for Telecommunication Line
Inspection and Compaction test for backfilling sub-grade 4th Layer (4 of 4) for Fire&Security Line Pit - G
"Inspection for Blinding Concrete under Non-Potable Water Line Isolation Pit for NPW-ISC-10, NPW-IS
Inspection of Water Proofing and Surface Preparation prior to start backfilling for Duct Bank of Telec
Inspection of Sand Bedding under pipe for Heating and Chilled Water Line at Zone-G - As highlighted (S
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 3 layers) Along the wall (I
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 7 layers) Behind Boulders
Excavation & Blinding Levels for Low Current Handholes (MH/WG/LC/01 & 04) and Fire Alarm & Secur
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 3 layers) Surround Elec
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 3 layers) Surround Low
Excavation & Blinding Levels for Electrical Handholes of Emergency (MH/WG/EM/01, 03, 04, 05 & 06)
Primer Coating prior to Damp Proofing for Footings & Walls of Seat Wall (Inner) All sides, Inside Phys
Concrete Pouring & Shuttering for Columns of Boundary Wall @ Grid (28-30/M-N) (Remaining parts), at
Concrete Pouring & Shuttering for Footings of Cabin Room, ETFE Pump Room, Water feature Pump Roo
Coordinates & Levels for Columns of Boundary Wall @ Grid (28-30/M-N) (Remaining parts), at Energy C
Coordinates & Levels for Footings of Cabin Room, ETFE Pump Room, Water feature Pump Room & Remai
Installation of PVC Conduit (Dia. 25mm) & Boxes for Power System (Fused Connection, Socket Outlet,
Installation of PVC Conduit (Dia. 75mm) and Junction Box for LC System at the New Ticket Booth No. (
Installation of PVC Conduit (Dia. 25mm) and Box for Voice and Data System (CAM, DATA & Telephone)
Installation of PVC Conduit (Dia. 25mm) and Box for Fire Alarm System (Break Glass) at the New Ticke
Installation of PVC Conduit (Dia. 25mm) and Box for Security System (CAM, Door Controller, Magnetic
Installation of Main Fire Water Pipe (250mmØ-UPVC-Class-5) From pit (B/F/04) to Point (647567.345
Installation of Main Potable Water Pipes (200mmØ-UPVC-Class-5) at Zone B- From Pit (C/PW/03) to P
"Inspection and compaction test 8th and 9th layer (Subgrade) for backfilling for MCPE 3 (S.O.G) axis 02 P
Concreting for MCPE 2 wall at axis 02/AB to 03/I-1 zone 2H (As highlighted)
Installation of Straight PVC Conduit (Dia.25mm) and Box for Voice Data (CAM) at Child Care Crescent-
Installation of Straight PVC Conduit (Dia.25mm) and Box for Fire Alarm (Speaker) at Infill Wall Axis
Surface Preparation Prior to start Backfilling for MCPE 2 Axis 02AB-02AD, Zone 2J (as highlighted)
Installation of straight PVC Conduit (Dia. 25mm) for Power System (Socket Outle) at Large Mosque G
Installation of straight PVC Conduit (Dia. 25mm) for Lighting System (LED B3/CE) at Large Mosque Gr
Installation of Straight PVC Conduit (Dia. 25mm) and Box for Security (CAM & Card Reader) at Child C
Installation of Straight PVC Conduit (Dia. 25mm) and Box for Voice & Data (WIFI) at Infill Wall Axis
Pipe Sleeve Installation of inner infill Wall Mechanical (Fire) From Axis (02/AN to 02/AO) At Cresce
'Pipe Installation of Strom Water pipe OUT FALL-O for (315 mm Ø- UPVC Pipes-Class 4 ) for Storm
'Bedding of Gravel 3/8" and Geotextile surrounding in pipes (315 mm Ø- UPVC Pipes-Class 4 ) for
'Bedding of Gravel 3/8" and Geotextile surrounding in pipes ( 315 mm Ø- UPVC Pipes-Class 4 ) for St
Inspection Of Pipe Installation For Irrigation ROW mainline Including Branches; (200mmØ- UPVC-Claa
Inspection Of Pipe Installation For Irrigation ROW Sub-mainline Including Branches; (90&50mmØ- UP
Inspection of Concrete Pouring for Footing of MV Line Pulling Pit - G/MV/37, L/MV/17, L/MV/02, L/MV/
Inspection of Formwork for Footing of MV Line Pulling Pit - G/MV/37, L/MV/15, L/MV/02, L/MV/17 at Z
Inspection of Steel Reinforcement for Footing and wall of MV Line Pulling Pit - G/MV/37, L/MV/02, L/
Excavation for Non-Potable Water Line including Pit POC-14 at Zone-B - As highlighted
Inspection and Compaction Test for backfilling Sub-grade 7th Layer (7 of 7) around Fire Water Line Pit f
Inspection and Compaction test for backfilling Sub-grade 4th Layer (4 of 4) around Potable Water Line P
Inspection of Sand Covering Layer for Protection of MV Line from (G/MV/19 to G/MV/11) at Zone-G as hi
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 4) around MV Line Pit G/MV/1
Inspection for Blinding Concrete under Non-Potable Water Line Isolation Pit for POC-27, POC-PT2, POC
Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 7) around MV Line Pit B/MV
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 7) around MV Line Pit F/MV/11
Inspection and Compaction Test for backfilling Sub-garde 3rd layer (3 of 14) above gravel for foul wat
Inspection and Compaction test for backfilling sub-grade 3rd Layer (3 of 4) for Fire&Security Line Pit - G
"Inspection and Compaction test for backfilling sub-grade 3rd Layer (3 of 4) for Telecommunication Line
Surface Preparation prior to start backfilling for Telecommunication Line Pit G/TL/45, G/TL/17, K/TL/27
Surface Preparation prior to start backfilling Fire&Security Line Pit G/FS/46, G/FS/20, K/FS/25, K/FS/26
Surface Preparation prior to start backfilling around MV Line Pit K/MV/01 K/MV/02, at Zone-K (As Highl
"Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 4) around MV Line Pit B/MV
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 1) above Sand Covering to pro
Inspection of Concrete Pouring for Wall of MV Line Pulling Pit - B/MV/10 & G/MV/07, G-MV-08 at Zone-
"Inspection of Formwork for Wall of MV Line Pulling Pit - B/MV/10 & G/MV/07, G-MV-08 at Zone-B&G (A
Surface Preparation prior to Stone Cladding for Walls (Outer sides) of Plant Room and Remaining both
Stone Cladding for Walls (Outer sides) of Plant Room and Remaining both sides, at Maze Garden, at hi
Excavation & Bed Preparation for Electrical Lines of Low Voltage (MH/WG/LV/09 to 16 & Pulling pit
Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Grade) (Out of 5 layers) for Water Featur
Surface Preparation prior to Backfilling Behind Boulders of Boat Garden, inside Water Garden, as high
Concrete Pouring & Shuttering for Columns of Boundary Wall @ Grid (28-30/Q-R) (Remaining parts), at
Concrete Pouring & Shuttering for Footings & Garde Beams @ Grid (1-3/C-I), Inside Energy Center 2, a
Concrete Pouring & Shuttering for Footing of Boundary wall @ Grid (C-I/0-1), at Energy Center 2, as h
Concrete Pouring & Shuttering for Walls of Wet Well F, (from Level +872.50 upto +876.10), Inside Wa
Concrete Pouring & Shuttering for Walls of Upstand above the Slab of Wet Well (E), Inside Water Gard
Inspection for Window and Door openings for New Ticketing Booth # 5A As per Attached Highlighted
Coordinates & Levels for Columns of Boundary Wall @ Grid (28-30/Q-R) (Remaining parts), at Energy C
Coordinates & Levels for Walls of Wet Well F, (from Level +872.50 upto +876.10), Inside Water Garde
Coordinates & Levels for Walls of Upstand above the Slab of Wet Well (E), Inside Water Garden as hig
Inspection and compaction test 3rd layer for backfilling for footing at Diaphagm wall grid 02/AR Zone
"Inspection and compaction test 8th and 9th layer (Subgrade) for backfilling for MCPE 3 (S.O.G) axis 02 P
Inspection and compaction test 7th & 8th layer for Backfilling at MCPE 3 Axis 02P to 02S Zone 2E (
Steel Reinforcements for walls & Two columns at Large Mosque, Axis A,3-4 to B,3-4 zone 1G (as highligh
Concreting for Tunnel 1 slab and strip footing between pc 15 & 17 (as Highlighted) Zone 2H
Concreting for RC Foundation axis 03R, 03/2-03/1 zone 2M 2N (as highlighted)
Steel Reinforcements for walls w32 at CAFETERIA zone 2A (as highlighted) , KAIG3-SCR-CF-S-0185-00
Shuttering for MCPE 2 wall at axis 02/AB to 03/I-1 zone 2H (As highlighted)
Installation of earthing clamps with conductor 70mm (9pcs.) for earthing reinforcement steel re-bar a
Level and Location for MCPE 2 wall at axis 02/AB to 03/I-1 zone 2H (As highlighted)
Concreting for mass concrete (4th layer) under strip footing between PC ( 152-158 )inner Zone 2K (as hi
Concreting for Infill wall (INNER) axis 02/P to 02/Q (as highlighted) Zone 2E (1st STAGE )
Concoreting for 5th layer Mass concrete of Strip Footing Between PC 156 - 158 Zone 2K (as highlighted)
Installation of EMT Conduit (Dia. 3/4) and Box for Fire Alarm (Speaker, Flashing Beacon, Break G
Installation of EMT Conduit (Dia. 3/4) and Box for Voice and Data (Data, WIFI, Telephone) at Man
Installation of UPVC conduit (4x110mm dia.) Low Current Ductbank (Fire and Security) no.(F/D-FS/01,
Installation of UPVC conduit (4x110mm dia.) Low Current Ductbank (TELECOM) no.(F/D-TL/03, GG/D-TL
Inspection and compaction test 1st layer for Childcare Zone 2N (as highlighted) axis 02AT-02AR (1st
Installation of straight PVC Conduit (Dia.25mm) and Box for Fire Alarm (Flashing Beacon) at Manag
Inspection Of Pipe Installation For Irrigation ROW mainline Including Branches; (200mmØ- UPVC-Claa
Inspection Of Pipe Installation For Non-Potable Water (Irrigation Line); (200mmØ- UPVC-Claas-5 ); A
'Pipe Installation of Strom Water pipe OUT FALL-E for (315 mm Ø- UPVC Pipes-Class 4 ) for Storm Wa
'Bedding of Gravel 3/8" and Geotextile surrounding in pipes ( 315 mm Ø- UPVC Pipes-Class 4 ) for St
Surface Preparation prior to start backfilling sub-grade for the Duct Bank of Fire & Security Distributio
INSPECTION FOR MANHOLE BASE INSTALLATION AND UPVC PIPE CONNECTION FOR - FW-A-3-4 (As Highli
"INSPECTION FOR INSTALLATION OF ALL RINGS (RISER) AND SLAB FOR MH-M-11 (As Highlighted)"
"Surface Preparation prior to start backfilling for the Duct Bank of Telecommunications Line from B/TL
"Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 4) around MV Line Pit B/MV
Surface Preparation prior to start backfilling for the Duct Bank of MV Line from B/MV/06 to B/MV/13 at
Surface Preparation prior to start backfilling around MV Line Pit G/MV/19 G/MV/11 at Zone-G (As Highl
"Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 2) beside MV Line from G/MV
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 4) for the Duct Bank of MV L
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 7) around MV Line Pit F/MV/09
Inspection and Compaction Test for backfilling Sub-grade 6th Layer (6 of 6) around Fire Water Line Pit f
Inspection and Compaction test for backfilling Sub-grade 3rd Layer (3 of 4) around Potable Water Line P
Inspection of Concrete Pouring for Slab of MV Line Pulling Pit - C/MV/23 , C/MV/40 , G/MV/19 , G/MV
Inspection of Water Proofing for Encasement of Crossing Pipe and Surface Preparation prior to start b
Inspection of Waterproofing (Internal & External) for MV Line Pit - B/MV/23, C/MV/23, G/MV/31, G/
Inspection of Formwork for Slab of MV Line Pulling Pit - C/MV/23 , C/MV/40 , G/MV/19 , G/MV/31 , G
Inspection of Steel Reinforcement for Slab of MV Line Pulling Pit - C/MV/23 , C/MV/40 , G/MV/19 , G
Steel Reinforcements for RING BEAM Zone 1H (INNER) Axis 01Z TO 01Y (as highlighted)
Inspection and compaction test 12th and 13th layer for backfilling for TUNNEL 2(between axis 02-T & 0
Steel Reinforcements for Diaphragm Wall axis 02/AQ (as highlighted) Zone 2N LEVEL 874.00 ( 2nd stage
Shuttering for mass concrete under strip footing (5th layer) between PC( 23-25 )outer Zone 1D(as highli
Level and Location for mass concrete under strip footing (5th layer) between PC( 23-25 )outer Zone 1D(
Concreting for Slab at MCPE 1 axis 03R, 03/3 to 03/2 Zone 2M 2N (as highlighted)
Level and Location for Slab at MCPE 1 axis 03R, 03/3 to 03/2 Zone 2M 2N (as highlighted)
Steel Reinforcements for Slab at MCPE 1 axis 03R, 03/3 to 03/2 Zone 2M 2N (as highlighted)
Shuttering for Slab at MCPE 1 axis 03R, 03/3 to 03/2 Zone 2M 2N (as highlighted)
Concreting for Infill wall (outer) between axis 02/AY to 02/AX (as highlighted) Zone 2Q
Level and Location for Infill wall (outer) between axis 02/AY to 02/AX (as highlighted) Zone 2Q
Steel Reeinforcements for RC Strip Footing pc 152 to pc 158 zone 2K (as highlighted)
Steel Reeinforcements for Retaining Wall RC foundation at Grid 01/C-01/B Zone 6 as highlighted
Surface preparation prior to Backfilling Along the wall (Inner Side) of Plant room, from Inside Physic
Sand Cover & Protection for Low Current Lines of Telecom (from MH/SG/TC/1-2-3-4-5 to 6) and Fire A
Sand Cover & Protection for Electrical Lines of Low Voltage (from MH/SG/LV/6-4 to 5) and Emergency
Sand Cover & Protection for Low Current Lines of Fire Alarm & Security (From MH/WG/FA/01 to 03) In
Sand Cover & Protection for Electrical Lines of Low Voltage (MH/WG/LV/01 to 03 & 04 to 08), Inside
Coordinates & Levels for Footings & Garde Beams @ Grid (1-3/C-I), Inside Energy Center 2, as highlig
Coordinates & Levels for Footing of Boundary wall @ Grid (C-I/0-1), at Energy Center 2, as highlighted
Coordinates & Levels for Wall & Column of Boundary Wall at Span 12, at Water Garden, as Highlighted
Surface Preparation prior to Water Proofing for Footings & Walls of Seat Wall (Inner) All sides, Inside
Steel Reinforcement for Footings & Garde Beams @ Grid (1-3/C-I), Inside Energy Center 2, as highligh
Steel Reinforcement for Footing of Boundary wall @ Grid (C-I/0-1), at Energy Center 2, as highlighted
Concrete Pouring & Shuttering for Wall & Column of Boundary Wall at Span 12, at Water Garden, as H
"Steel Reinforcements for Infill wall INNER grid 02-AC to 02-AD (as highlighted) Zone 2J "
Surface preparation & Base primer coating Under Strip Footing between PC 44-46 (as highlighted) Zon
Protection layer of 4mm thick bituminous protection board for retaining wall (as highlighted) Zone 1N
Slated layer of 4mm thick bituminous water proofing membrane for retaining wall (as highlighted) Zon
Surface preparation & Base primer coating for retaining wall (as highlighted) Zone 1N 1M 1L 1K 1J
Two layer of 4mm thick modified bituminous waterproofing membrane for retaining wall (as highlight
Level and Location for Infill wall (outer) axis 02/F to 02/E (as highlighted) Zone 2B (1s tSTAGE )
"Steel Reinforcements for Infill wall for 2 infill walls Buttress 71 axis ( 02/J ) & Butterss 72 axis ( 02/K )
Concreting for Infill wall (OUTER) up to level 863.55 axis 02/D to 02/A (as highlighted) Zone 2A
Shuttering for Infill wall (outer) axis 02/F to 02/E (as highlighted) Zone 2B (1s tSTAGE )
Level and Location for Infill wall (INNER) axis 01/H to 01/I (as highlighted) Zone 1C (1st STAGE )
Shuttering for Infill wall (INNER) axis 01/H to 01/I (as highlighted) Zone 1C (1st STAGE )
Concreting for Infill wall (INNER) axis 01/H to 01/I (as highlighted) Zone 1C (1st STAGE )
Concreting for Infill wall between PC 96-97 inner between Gridline 02AD- 02AE (As highlighted) ZONE 2J
Shuttering for Diaphragm Wall axis 02/AQ (as highlighted) Zone 2N LEVEL 874.00
Leve and Location for Diaphragm Wall axis 02/AQ (as highlighted) Zone 2N LEVEL 874.00
Level and Location for mass concrete under strip footing (4th layer) between PC( 21-23-25 )outer Zone
Shuttering for mass concrete under strip footing (4th layer) between PC( 21-23-25 )outer Zone 1D(as hi
Shuttering for MCPE 2 Wall (inner) & counterfort between Axis 03/I-1 & 03/I Zone 2H As highlighted
Level and Location for RING BEAM Zone 1H (INNER) Axis 01Z TO 01Y (as highlighted)
Shuttering & scaffoldings for RING BEAM Zone 1H (INNER) Axis 01Z TO 01Y (as highlighted)
Installation and Survey Report for Location and Levels of Anchor Bolts for RING BEAM Zone 1H (INNER) 0
Inspection and compaction test 5th & 6th layer for Backfilling at MCPE 3 Axis 02P to 02S Zone 2E (as
Installation of Water Feature Sleeves; (400&315&200&160&110mmØ UPVC CLASS 4) ;For wet well (F
Steel Reinforcements for Infill wall (OUTER) up to level 863.55 axis 02/D to 02/A (as highlighted) Zone 2
Shuttering for Infill wall (OUTER) up to level 863.55 axis 02/D to 02/A (as highlighted) Zone 2A
Level and Location for Infill wall (OUTER) up to level 863.55 axis 02/D to 02/A (as highlighted) Zone 2A
Level and location for RC Foundation zone 2M 2N (as highlighted)
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 7) around MV Line Pit F/MV/11
Inspection and Compaction Test for backfilling Sub-garde 2nd layer (2 of 14) above gravel for foul wat
Inspection and Compaction Test for backfilling Sub-garde 1st layer (1 of 14) above gravel for foul wat
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 7) around MV Line Pit B/MV
Inspection of Blinding Concrete under MV Line Pit G/MV/37 at Zone-G - as highlighted
Inspection of backfilling Gravel 1st layer (1 of 1) for foul water line manhole FW-A-6 at Zone-6A - As Hig
Surface Preparation prior to start backfilling around MV Line Pit G/MV/20 G/MV/26 , F/MV/04 , at Zone-
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 1) above Sand Covering to pro
Inspection and compaction test 6th layer for Backfilling at MCPE 2 wall inner axis AA-E (as highlighted
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 7) around MV Line Pit B/MV/
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 4) for the Duct Bank of MV Li
Inspection for Installation of MV Line Junction Pit - G/MV/20 - as highlighted
Surface Preparation prior to start backfilling around Fire & Security Line Pit K/FS/24, K/FS/17, K/FS/13,
Surface Preparation prior to start backfilling for Telecommunication Line Pit K/TL/26, K/TL/04, K/TL/21,
Inspection and Compaction test for backfilling sub-grade 2nd Layer (2 of 4) for Fire&Security Line Pit -
"Inspection and Compaction test for backfilling sub-grade 2nd Layer (2 of 4) for Telecommunication Line
Inspection and Compaction test for backfilling Sub-grade 4th Layer (4 of 7) around Fire Water Line Pit fo
Inspection and Compaction Test for backfilling Sub-grade 4th Layer (4 of 7) around Potable Water Line
Excavation for Non-Potable Water Line Pit POC-NPW/PT1 at Zone-B - As highlighted
"Surface Preparation prior to start backfilling Gravel for the Duct Bank of Telecommunications Line fr
Surface Preparation prior to start backfilling sub-grade for MV Line from G/MV/36 to B/MV/09 at Zone-
"Inspection for Casting the Blinding Concrete under the Manhole for FW-A-3-4 , FW-A-3-3 (as Highlighte
Inspection and compaction test 6th layer for Backfilling at MCPE 2 wall inner axis AA-E (as highlighted
Inspection for Casting Blinding Concrete under Manhole - MH-M-03 - as highlighted
"Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 4) around MV Line Pit B/MV/
Inspection and Compaction test for NGL of Storm Water Line Branch at Zone-6B -as highlighted
Excavation for Non-Potable Water Line Branch including Pit POC-32 & POC-12 at Zone-G - As highlighted
Inspection and Compaction Tests of 7th (Final) Layer (Sub Garde) Backfilling (Out of 7 Layers) along t
Warning Tiles & Tape for Low Current Lines of Telecom (from MH/ZG/TC/2 to 5, 13 to 1 & Some part b
Warning Tiles & Tape for Electrical Lines of Low Voltage (from MH/ZG/LV/1 to 16, 2 to 5, 6 to 11 a
Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Grade) (Out of 6 layers) along Foundatio
Sand Bedding for Low Current Lines of Telecom (from MH/ZG/TC/06 to 07), at Maze Garden, as highl
Inspection for Installed Low Current Handholes (MH/PG/LC/02, 03, 04, 05, 06, 07, 08, 11, 13, 14, 15,
Inspection for Installed Electrical Handholes of Low Voltage (MH/PG/LV/02, 03, 04, 05, 06, 09, 10, 1
Concrete Pouring & Shuttering for Typical Precast Infill Panels, at Grid (A/1-8), Inside Butterfly Garde
Steel Reinforcement for Typical Precast Infill Panels, at Grid (A/1-8), Inside Butterfly Garden, as high
Coordinates & Levels for Beams (At level +872.35) of Boundary Wall @ Grid (17-22/M), at Energy Cente
Concreting for MCPE 2 Wall (inner) & counterfort between Axis 03/I-1 & 03/I Zone 2H As highlighted
Level and Location for MCPE 2 Wall (inner) & counterfort between Axis 03/I-1 & 03/I Zone 2H As highli
Steel Reinforcements for Infill outer wall between (01H & 01G) (As highlighted) ZONE 1C
Steel Reinforcements for Infill wall inner between 02-O to 02-N (as highlighted) Zone 2E (1ST STAGE )
Shuttering and shear connector for Infill wall inner axis 02Q - 02R zone 2E (as highlighted) (2nd STAGE )
Concreting for Infill wall inner axis 02Q - 02R zone 2E (as highlighted) 2nd STAGE
Level and Location for RC Strip Footing pc 152 to pc 158 zone 2K (as highlighted)
Shuttering for RC Strip Footing pc 152 to pc 158 zone 2K (as highlighted)
Shuttering for (MCPE 1) wall and counterfort at Zone 2M 2N up to level 875.55 (as highlighted)
Level and location for (MCPE 1) wall and counterfort at Zone 2M 2N up to level 875.55 (as highlighted)
Inspection and compaction test 1st & 2nd layer for Backfilling for Retaining wall Axis 01AH TO 01AP (a
Inspection and compaction test 3rd & 4th layer for Backfilling at MCPE 3 Axis 02P to 02S Zone 2E (as
Inspection and compaction test 4th and 5th layer for Backfilling at MCPE 2 wall inner axis AA-E (as hi
Surface Preparation Prior to start Backfilling Infill Wall at Tip Zone 2R (as highlighted)
Shuttering for South watch tower Abutment wall at Grid 02/C (as highlighted) (3rd)
Bolt Tightening Inspection of Crescent 01 Zone 3 - 1F from Axis 01P to 01S as per the highlighted are
Inspection of Installation and Alignment for the Crescent 01 Zone 3 1G from Axis 01S to 01W.
Surface Preparation and Paint Touch Up Inspection in Crescent 02 Zone 2G & 2H from Axis 02AB to 02
Excavation & Bed preparation for Low Current Lines of Telecom (from MH/ZG/TC/06 to 07), at Maze
Final Inspection for the Crescent 02 Zone 6 2E from Axis (02R to 02N).
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 2 layers) for Water Feat
Pre Assembly Bolt Tightening Inspection of Crescent 01 Zone 1 1L, 1M, 1N Axis (01AI to 01AP) (as per
Inspection & Compaction tests of 10th (Final) Layer (Sub Base) Backfilling (after 9th layer Sub Base
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 5 layers) for Water Featu
Surface Preparation prior to Backfilling to support Irrigation Sub-Main Line Distribution Network (50,
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 6 layers) along Foundatio
Concrete Pouring & Shuttering for Beams (At level +872.35) of Boundary Wall @ Grid (17-22/M), at En
Steel Reinforcement for Columns of Boundary Wall @ Grid (28-30/M-N & Q-R) (Remaining parts), at En
'Warning Tape Pipe Installation For Non-Potable Water (Irrigation Line ); (200mmØ- UPVC-Claas-5 );
'Warning Tape Pipe Installation For Non-Potable Water (Irrigation Line ); (200mmØ- UPVC-Claas-5 );
'Potable Water Pipes Sand Cover & Pipes Protection (30 cm above Pipes). As per highlighted Area in
Installation of PVC Conduit (Dia. 32mm) for Lighting (Lighting Fixtures) at the Boundary Wall (betwe
'Fire Fighting Networks Sand Cover & Pipes Protection (30 cm above Pipes) (Red Line). As per highlig
Concreting for blinding for central bridge abutment axis ( 02/AK) zone 4 (as highlighted)
'Pipe Installation of Strom Water pipe OUT FALL-M for (dia 450 mm Ø- UPVC Pipes-Class 4 ) for St
'Bedding of Gravel 3/8" and Geotextile surrounding in pipes (dia 450 mm Ø- UPVC Pipes-Class 4 ) fo
Shuttering for 2nd layer Mass Concrete of Central Bridge Foundation (as highlighted) Zone 4 Grid 1M
Surface Preparation Prior to start Backfilling Infill Wall at Tip Zone 2R (as highlighted)
Steel Reinforcements for South watch tower for Retaining Wall Kicker grid 02-C Zone 7
Concreting for Large Mosque walls from S.O.G to the bottom of lower first slab ,Zone 1G (as highlighted)
Shuttering for Large Mosque walls from S.O.G to the bottom of lower first slab ,Zone 1G (as highlighted)
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 5 Layers) for Water Feat
Concreting for (MCPE 1) wall and counterfort at Zone 2M 2N up to level 875.55 (as highlighted)
Sand Bedding for Irrigation Sub-Main Line Distribution Network (50,90 mm Line) at Discovery Garden
Inspection and compaction test 3rd & 4th layer for Backfilling at MCPE 3 Axis 02P to 02S Zone 2E (as
Concreting for Infill wall kicker for Zone 2A between Axis 02-1, 02A-02B-02C (AS HIGHLIGHTED)
Level and Location for Infill wall kicker axis 02AO - 02AN zone 2M (as highlighted)
Steel Reeinforcements for Infill wall kicker axis 02AO - 02AN zone 2M (as highlighted)
Shuttering and shear connector for Infill wall kicker axis 02AO - 02AN zone 2M (as highlighted)
Level and Location for Infill wall axis 02Q - 02R zone 2E (as highlighted)
Inspection and compaction test 10th and 11th layer for backfilling for TUNNEL 2(between axis 02-T & 0
Installation of straight UPVC Conduit (Dia. 32mm) for Power (CAM-153) at Boundary Wall Column be
Installation of PVC Conduit (Dia. 32mm) for Lighting (Lighting Fixtures) at the Boundary Wall (betwe
Installation and Fixation of Steel Structures for Picnic Area units 10, 11, 13, 14, 15, 16, 17.
Level and Location Coordinates for Tunnel-1 Slab and Strip Footing Between PC 15 to 17 @ Zone 1C , a
Shuttering & Concreting for Tunnel-1 Slab and Strip Footing Between PC 15 to 17 @ Zone 1C , as highl
Steel Reinforcement for Tunnel-1 Slab and Strip Footing Between PC 15 to 17 @ Zone 1C , as highligh
Steel Reinforcement for Infill Wall Zone 2A ( Outer ) , Upto Level 863.55 , as highlighted area in atta
Installation of straight PVC conduit (Dia. 4x160mm) Medium Voltage Ductbank no. FF/D-MV/04 and c
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 6 layers) along Foundation
Plaster Guide Points & Accessories for Plastering of Parapet Wall (All Sides) on Stair Case Room on R
Concrete Pouring & Shuttering for Lintels of Doors & Block work & Stiffner Column's for all walls of Gen
Inspection of Plastering for Walls (all sides) of Ladies Toilets, Inside Public Toilet # 1, At highlighted
Coordinates & Levels for Columns of Boundary Wall @ Grid (M/21-28), at Energy Center 2, as highligh
Concrete Pouring & Shuttering for Columns of Boundary Wall @ Grid (M/21-28), at Energy Center 2, as
Steel Reinforcement for Walls of Wet Well F, (from Level +872.50 upto +876.10), Inside Water Garden
Surface Preparation prior to start backfilling around Fire & Security Line Pit K/FS/02, K/FS/03, K/FS/20,
"Surface Preparation prior to start backfilling for Telecommunication Line Pit K/TL/02, K/TL/03, K/TL/14
Inspection of Concrete Encasement for Crossing pipe on Telecommunication and Fire & Securtiy Line at
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 7) around MV Line Pit B/MV
Inspection and Compaction Test for backfilling Sub-grade 9th Layer (9 of 12) under Cesspool-3 at Zone-D
"INSPECTION FOR INSTALLATION OF ALL RINGS (RISER) AND SLAB FOR FW-A-3 (As Highlighted) "
INSPECTION FOR MANHOLE BASE INSTALLATION AND UPVC PIPE CONNECTION FOR - FW-A-3 (As Highligh
INSPECTION FOR MANHOLE BASE INSTALLATION AND UPVC PIPE CONNECTION FOR - FW-A-3-1 (As Highli
Inspection and Compaction Test for backfilling Sub-grade 5th Layer (5 of 6) around Fire Water Line Pit f
Inspection and Compaction test for backfilling Sub-grade 2nd Layer (2 of 4) around Potable Water Line P
Inspection and Compaction test for backfilling Sub-grade 3rd Layer (3 of 7) around Fire Water Line Pit fo
Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 7) around Potable Water Line
Inspection for Installation of MV Line Junction Pit - G/MV/26 - as highlighted
Inspection of Sand bedding under pipe for Potable Water Line at Zone-C - as highlighted (Stock Pile# 132
Inspection of Sand bedding under pipe for Fire Water Line at Zone-C - as highlighted (Stock Pile# 132)
Surface Preparation prior to start backfilling gravel around MV Line Pit F/MV/11 at Zone-F (As Highlight
Weld Visual & NDT Inspection for the Crescent 01, Zone 1 - 1K Axis 01AD & 01AG as per attached high
Weld Visual & NDT Inspection for the Crescent 01, Zone 1 - 1L, 1M & 1N Axis 01AG to 01AP as per att
Weld Visual & NDT Inspection for the Baseplate Washer Plates in Crescent 01, Zone 1 1K Axis (01AD t
Weld Visual & NDT Inspection for the Crescent 01, Zone 1 - 1J Axis 01AA to 01AD as per attached high
Inspection Of Pipe Installation For Non-Potable Water (Irrigation Line ); Submain Line Including B
Pipe Sleeves Installation of Outer infill Walls ( Condensed Drain (CD ) and Compressed Air) ( From Ax
Pipe Sleeves Installation of Inner infill Walls (Fire , Potable , Non Potable , Condensed Drain and Co
Inspection for installation of Fire Water Line Pit for C/F/10, at Zone-C - as highlighted
Inspection for Installation of Potable Water Line Pit C/PW/04 - as highlighted
Inspection and Compaction test for backfilling sub-grade 1st Layer (1 of 4) for Fire&Security Line Pit - G
Inspection and Compaction test for backfilling sub-grade 1st Layer (1 of 4) for Telecommunication Line P
Surface Preparation prior to start backfilling around foul water line manhole FW-A-6 at Zone-6A (As Hig
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 1) above gravel for the Duct
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 2) for the Duct Bank of MV L
Inspection and Compaction Test for backfilling sub-grade 9th & 10th Layer (10 of 10) for Foul Water
Inspection of Sand bedding under pipe for RO Water Line at Area-A&B - As highlighted (Stock Pile # 132)
Inspection of Blinding Concrete under MV Line Pit L/MV/17, L/MV/02, L/MV/15 at Zone-L - as highlighte
Inspection of Concrete Pouring for the wall of SBC-08 - Wing Wall (Left Side) - As Highlighted
Inspection of Formwork for the wall of SBC-08 - Wing Wall (Left Side) - As Highlighted
Inspection of Waterproofing and Application of Primer (1st Coat, 2nd Coat and 3rd Coat) for FW-A-6 (As
Inspection of Concrete Pouring for Side Walls of MV Line Pulling Pit - B/MV/23, G/MV/21 at Zone-B&G (A
Inspection of Formwork for Side Walls of MV Line Pulling Pit - B/MV/23, G/MV/21 at Zone-B&G (As Highl
Inspection & Compaction tests of 7th (Final) Layer (Sub-Grade) Backfilling (Out of 7 layers) in Betwee
Plaster Guide Points & Accessories for Plastering of External Walls of Stair Core Room on Roof at Gri
Rough coat Prior to Plastering for All Internal walls (All Sides) Inside Public Toilet # 2, At highlighted
Rough coat Prior to Plastering for Walls (all sides) of Ladies Toilets Inside Public Toilet # 1, At highli
Coordinates & Levels for Walls of Seat Walls (08 no's) inside Butterfly Garden, as highlighted area in
Slated Layer of 4 mm Thk. Modified Bitumenous Membrane on Water Proofing for Foundation of Boundar
Applying Crack filler to Cracks (136 no's) for repair on Parapet wall (from Internal Side)(for all Para
Protection Layer of 4 mm Thk. Bitomenous Protection Board for Foundation of Boundary wall (Outer Fa
Steel Reinforcement for Beams (At level +872.35) of Boundary Wall @ Grid (17-22/M), at Energy Cente
Concrete Pouring & shuttering for Walls of Seat Walls (08 no's) inside Butterfly Garden, as highlighte
Steel Reinforcement for Walls of Seat Walls (08 no's) inside Butterfly Garden, as highlighted area in
Inspection and compaction test 1st layer for backfilling for Childcare Zone2N (as highlighted) (1st of
Inspection for Casting the Blinding Concrete under the Gullies for G-G-26, G-G-27 (as Highlighted)
Inspection for Blinding Concrete under Fire Water Line Pit for C/F/10, at Zone-C - as highlighted
Inspection for Blinding Concrete under Potable Water Line Pit C/PW/04 - as highlighted
Inspection of Concrete (Plain) Pouring for Duct Bank of Telecommunications line from C/TL/54 to C/TL/5
Inspection and Compaction test for Backfilling Sub-grade 1st Layer (1 of 4) (above gravel) around the
Surface Preparation prior to start water proofing for the short pices of foul water line manhole FW-A-6
"Excavation for Storm Water Line from MH-M-02 to MH-M-03 including Manhole MH-M-02, MH-M-03 -
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 2) for the Duct Bank of MV L
Inspection of backfilling Gravel 1st Layer (1 of 1) for the Duct Bank of MV Line from B/MV/10 to B/MV/1
Inspection and Compaction test for backfilling Sub-grade 2nd Layer (2 of 7) around Fire Water Line Pit fo
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 7) around Potable Water Line
Inspection and Compaction Test for backfilling sub-grade 8th Layer (8 of 10) for Foul Water Line betw
Excavation for MV Line Pit - L/MV/15 , L/MV/02 , L/MV/17 at Zone-L - as highlighted
Inspection of Excavation for RO Water Line at Area-A&B - As highlighted
Inspection for Casting Blinding Concrete under Manhole - MH-O-09, MH-O-10, MH-O- 08-1 and Gullies
Surface Preparation prior to start Water Proofing for Short Piece of MV Line for Pit F/MV/08 and F/MV/0
Inspection of Sand bedding under pipe for Fire & Security Distribution Line at Zone-G - as highlighted (St
Inspection of Sand bedding under pipe for Telecommunication Line at Zone-G - as highlighted in the att
Inspection and Compaction test for backfilling sub-grade 3rd Layer (3 of 4) for Fire &Security Line Pit -
Inspection and Compaction test for backfilling sub-grade 3rd Layer (3 of 4) for Telecommunication Line
Surface Preparation prior to start backfill for the Duct Bank of MV Line from F/MV/01 to F/MV/08 at Zo
Surface Preparation prior to start backfilling sub-grade around MV Line Pit B/MV/04, F/MV/09 at Zone-
Surface Preparation prior to start backfilling sub-grade around MV Line Pit B/MV/09, B/MV/12, B/MV/19
Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 3) above Sand Covering for Fir
Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 3) above Sand Covering for Po
Inspection of Sand Covering to protect the pipe for Non-Potable Water Line at Zone- B&C - as highlight
Inspection and Compaction Test for backfilling sub-grade 7th Layer (7 of 10) for Foul Water Line betw
Surface Preparation prior to start backfill gravel for the Duct Bank of MV Line from B/MV/07 to B/MV/0
Sand Cover & Pipe Protection for Water Feature Lines (Part 6 next level) (HDPE dia 200 mm) at Geyse
Surface Preparation prior to Backfilling along Foundation of Plant Room (Inner sides) from Inside Maz
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 2 layers) surround the Seat
Sand Cover & Pipe Protection for Water Feature Line (HDPE 50mm) at Entrance of Mist Garden,Inside
Sand Cover & Pipe Protection for Water Feature Lines (200mm HDPE), Between Boat garden & Aviary G
Steel Reinforcement for Wall & Column of Boundary Wall at Span 12, at Water Garden, as Highlighted
Plaster Guide Points & Accessories Prior to Rough coat of Plastering for Walls all sides of Ladies Toilet
Inspection of Block work from Lintel upto Final Height Inside Staircase room (GF-5076) at Grid (7-8/
Inspection of Plastering for Walls, all sides of Gents Toilets Inside Public Toilet # 1, At highlighted ar
Plaster Guide Points & Accessories for Plastering of all walls Inside Public Toilet # 2, At highlighted a
Inspection of Block work upto Lintel Height Inside Staircase room (GF-5076) at Grid (7-8/F-H), at Ma
Protection layer of 4mm thick bituminous protection board for Tip until S.O.G (as highlighted) Zone 2R
Two layer of 4mm thick modified bituminous waterproofing membrane for Tip until S.O.G (as highlight
Surface Preparation prior to Start backfilling at Retaining wall Axis 01AH TO 01AP (as highlighted) ZONE
Inspection and compaction test 2nd layer for backfilling for footing at Diaphagm wall grid 02/AR Zone
Inspection and compaction test 8th and 9th layer for backfilling for TUNNEL 2(between axis 02-T & 02-S
Level and Location for Infill wall (INNER) axis 02/O to 02/P (as highlighted) Zone 2E (2nd STAGE )
Concreting of Mass concrete of Strip Footing Between PC 44-46 Zone 1G (as highlighted)
Concreting for Infill wall (INNER) axis 02/O to 02/P (as highlighted) Zone 2E (2nd STAGE )
Excavation for Potable Water Line at Zone-C - as highlighted
Excavation for Fire Water Line at Zone-C - as highlighted
Excavation for Storm Water Line between MH-O-11 to MH-O-08-1 including branch, Manhole MH-O-08-1
Inspection for Laying of Red Tiles above the pipe for MV Line from B/MV/01 to B/MV/22 and B/MV/23
Inspection and Compaction test for backfilling Sub-grade 5th Layer (5 of 6) around Fire Water Line Pit fo
Inspection of Concrete Pouirng for WALL of MV Line Pulling Pit - C/MV/22, C/MV/25, G/MV/08, G/MV/3
Inspection of Formwork for WALL of MV Line Pulling Pit - C/MV/22, C/MV/25, G/MV/08, G/MV/36 at Zo
Installation of PVC conduit (dia.75mm) Low Current Ductbank (Fire and Security) and connection
Installation of PVC conduit (dia.75mm) Low Current Ductbank (Fire and Security) and connection to
Installation of PVC conduit (dia.25mm) and box for Voice and Data (Telephone) at the Public Toilet - 3
Installation of straight PVC conduit (dia.25mm) and Box for Security (Camera) at Large Mosque ( Stair
Installation of straight PVC conduit (dia.25mm) and Box for Voice and Data (Camera) at Large Mosque (
Installation of straight PVC conduit (dia.25mm) and Box for Fire Alarm (Speaker) at Large Mosque as p
Installation of straight PVC conduit 32mm (1pc.) and Box for Power (Twin Socket Outlet & Fused Conn
Installation of straight PVC conduit 32mm (1pc.) and Box for Lighting (W7) at Large Mosque as per atta
Installation of straight PVC conduit (Dia. 75mm) Low Voltage Ductbank (Emergency) and connect
Installation of straight PVC conduit (Dia. 75mm) Low Voltage Ductbank (Normal Lighting) and con
Installation of straight PVC conduit 32mm (1pc.) and Box for Power (Fused Connection Unit & Twin Switc
Inspection of Alignment for the Installed Baseplates in Crescent 01 Zone 1 - 1M Outer & Inner.
Coordinates & Levels of Blinding under Footings & Grade Beams @ Grid (12B-15/D-H), at Energy Center
Coordinates & Levels for Beams (At level +872.35) of Boundary Wall @ Grid (18-28/R), at Energy Cente
Concrete Pouring for Blinding under Footings & Grade Beams @ Grid (12B-15/D-H), at Energy Center 2,
Concrete Pouring & Shuttering for Beams (At level +872.35) of Boundary Wall @ Grid (18-28/R), at Ene
Concrete Pouring for Typical Precast Infill Panels, at Grid (A/9-14), Inside Butterfly Garden, as highli
Steel Reinforcement for Typical Precast Infill Panels, at Grid (A/9-14), Inside Butterfly Garden, as hig
Steel Reinforcement for Footings & Kickers of Cabin Room, ETFE Pump Room, Water feature Pump Roo
Stone Cladding for Walls of Plant Room (from Inner & Outer sides) of Physic garden, as highlighted a
Inspection of Spatter Dash (Rough Coat) Prior to Plastering for Exterior Elevation of Public Toilet # 3,
Block work from Lintel upto final Height for all walls Inside Public Toilet # 2, At highlighted area in a
Inspection and compaction test 5th &6th layer for Backfilling around PC 125 Zone 2E (as highlighted) ax
Concreting for Buttress (with beam ), BOI,BII ( 57 & 58 ) zone 1P (as highlighted)
Inspection and compaction test 1st & 2nd layer for Backfilling at MCPE 3 Axis 02P to 02S Zone 2E (as
Inspection and compaction test 10th layer Backfill for MCPE 3 Inner wall Axis 03A to 02S (as highlighted
Inspection and compaction test 1st layer for Backfilling at MCPE 2 wall inner axis AA-E (as highlighted
Inspection and compaction test 2nd and 3rd layer for Backfilling at MCPE 2 wall inner axis AA-E (as h
Surface Preparation (Internal & External) prior to start Water Proofing for MV Line Pit - B/MV/23,
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 3) beside gravel for Duct Bank
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 3) beside Gravel for the Du
Inspection and Compaction test for backfilling sub-grade 2nd Layer (2 of 4) for Fire &Security Line Pit -
Inspection and Compaction test for backfilling sub-grade 2nd Layer (2 of 4) for Telecommunication Line
Inspection of Water Proofing and Surface Preparation prior to start backfilling for Fire & Security Lin
Inspection of Water Proofing and Surface Preparation prior to start backfilling for Telecommunication
"INSPECTION FOR INSTALLATION OF ALL RINGS (RISER) AND SLAB FOR MH-G-07 (As Highlighted) "
INSPECTION FOR MANHOLE BASE INSTALLATION AND UPVC PIPE CONNECTION FOR - MH-G-07 (As Highli
Inspection and Compaction test for backfilling Sub-grade 4th Layer (4 of 6) around Fire Water Line Pit fo
Inspection of Backfilling Sub-grade 5th Layer (5 of 5) For Foul Water Line From FW-A-6 to FW-A-4 - As
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 3) beside gravel for Duct Bank
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 3) beside Gravel for the D
Surface Preparation prior to start backfilling around Fire & Security Line Pit F/FS/03, F/FS/04, F/FS/11
"Surface Preparation prior to start backfilling for Telecommunication Line Pit F/TL/03, F/TL/04, F/TL/1
Inspection for Installation of Potable Water Line Isolation Pit C/PW/02, F/PW/08 at Zone- C&F - as highl
Inspection for Installation of Fire Water Line Isolation Pit C/F/05, K/F/07 at Zone - C&K - as highlighted
Surface Preparation Prior to start Backfilling for retianing wall Axis 01/AA-01/AH, Zone 1j 1k (as highligh
Level and Location for Infill wall (INNER) axis 02/P to 02/Q (as highlighted) Zone 2E (1st STAGE )
Inspection and compaction test 7th layer for backfilling for TUNNEL 2(between axis 02-T & 02-S) zone 2
Shuttering for Infill wall (INNER) axis 02/P to 02/Q (as highlighted) Zone 2E (1st STAGE )
Shuttering for Buttress (with beam ), BOI,BII ( 57 & 58 ) zone 1P (as highlighted)
Level and Location for Buttress (with beam ), BOI,BII ( 57 & 58 ) zone 1P (as highlighted)
Stack Boulders Installed 2nd layer at Step 2, 3 & 4, (upto level 875.85, 876.25 & 876.65), Left side o
Stack Boulders Installed 1st & 2nd layers (Remaining) at Step 3 & 4, at levels +875.97, +876.27, +876
Steel Reinforcements for Diaphragm Wall axis 02/AQ (as highlighted) Zone 2N LEVEL 874.00
Sand Cover & Protection for Low Current Lines of Telecom (from MH/ZG/TC/2 to 5, 13 to 1 & Some par
Sand Cover & Protection for Electrical Lines of Low Voltage (from MH/ZG/LV/1 to 16, 2 to 5, 6 to 1
Inspection & Compaction tests of 1st Layer Backfilling (Sub Grade) (Out of 3 layers) Surround the Ma
Protection layer of 4mm thick bituminous protection board for Buttreess Bo 80 & 81 up to level 870.00
Single layer of 4mm thick modified bituminous waterproofing membrane for Buttreess Bo 80 & 81 up to
Inspection & Compaction tests of 4th (Final) Layer Backfilling (Sub-Base) Out of 4 layers (2 layers S
Surface preparation & Base primer coating for Buttreess Bo 80 & 81 up to level 870.00 Zone 2E (as hig
Protection layer of 4mm thick bituminous protection board for Tunnel 2 shaft Zone 2F up to level 867 (
Two layer of 4mm thick modified bituminous waterproofing membrane for Tunnel 2 shaft Zone 2F up to
Plaster Guide Points & Accessories for Plastering of External Walls of Stair Core Room on Roof at Gri
Surface preparation & Base primer coating for Tunnel 2 shaft Zone 2F up to level 867 (as highlighted)
Inspection & Compaction Tests of Backfilling (Sub Grade) for Support from bothsides of Sand Cover of
Inspection & Compaction Tests of Backfilling (Sub Grade) for Support from bothsides of Sand Cover of
Inspection and compaction test 9th layer Backfill for MCPE 3 Inner wall Axis 03A to 02S (as highlighted)
Surface preparation & Base primer coating for Tip until S.O.G (as highlighted) Zone 2R
Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Base) Out of 4 layers (2 layers Sub-Grade
Concrete Pouring for Blinding under Low Current Handholes (MH/PG/LC/11, 13, 14, 15 & 16) and Fire
Concrete Pouring for Blinding under Electrical Handholes of Low Voltage (MH/PG/LV/09, 10, 11 & 12
Applying Crack filler to Cracks for repair on Parapet wall (from Internal Side) at Grid (3/A-E & A/3-6
Concrete Pouring & Shuttering for Columns of Boundary Wall @ Grid (L/5-14), at Energy Center 2, as h
Coordinates & Levels for Columns of Boundary Wall @ Grid (L/5-14), at Energy Center 2, as highlighte
Installation of PVC Conduit (Dia.25mm) & Boxes for Security System (CAM) at the Large Mosque (betw
Installation of PVC Conduit (Dia.25mm) & Boxes for Voice and Data (CAM) at the Large Mosque (betwe
"INSPECTION FOR INSTALLATION OF STORM WATER LINE GULLIES G-O-29, G-O-32, G-O-33, G-O-43, G-O-4
Inspection for Casting Blinding Concrete under Manhole - MH-G-07 - as highlighted
Inspection for Installation of Potable Water Line Isolation Pit - B/PW/11 at Zone- B - as highlighted
Inspection and Compaction Test for backfilling Sub-grade 4th Layer (4 of 6) around MV Line Pit C/MV/02
Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 4) around MV Line Pit C/MV/04
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 7) around Fire Water Line Pit fo
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 7) around Potable Water Line
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 2) above Sand Covering for Fir
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 2) above Sand Covering for Po
Inspection and Compaction test for backfilling Sub-grade 4th Layer (4 of 4) around MV Line Junction P
Inspection of Concrete Pouring for Wall of MV Line Pulling Pit - H/MV/29, H/MV0/6, H/MV/04 at Zone-H
Inspection of Formwork for Wall of MV Line Pulling Pit - H/MV/29, H/MV0/6, H/MV/04 at Zone-H (As Hig
Inspection of Concrete Pouring for Footing of MV Line Pulling Pit - B/MV/10 at Zone-B (As Highlighted)
Inspection of Formwork for Footing of MV Line Pulling Pit - B/MV/10 at Zone-B (As Highlighted)
Inspection of Steel Reinforcement for Footing and wall of MV Line Pulling Pit - B/MV/10 at Zone-B (As Hi
Surface Preparation prior to start backfilling around MV Line Pit B/MV/01, B/MV/15 , B/MV/22 , G/
Inspection and Compaction test for backfilling Sub-grade 3rd Layer (3 of 6) around Fire Water Line Pit fo
Inspection of Backfilling Sub-grade 4th Layer (4 of 5) For Foul Water Line From FW-A-6 to FW-A-4 - As
Concreting for RING BEAM Zone 1M (OUTER) Axis 01-1, 01AJ to 01AM (as highlighted)
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 3) above Sand Cover at Zone -
Inspection for Installation of MV Line Junction Pit - C/MV/24, C/MV/41, H/MV/10 - as highlighted
Inspection for Installation of MV Line Junction Pit - B/MV/09, G/MV/12 - as highlighted
Inspection for Installation of MV Line Junction Pit - B/MV/01, H/MV/30, L/MV/07, L/MV/09 - as highligh
'Pipe Installation of Strom Water pipe OUT FALL-M for (dia 450 mm Ø- UPVC Pipes-Class 4 ) for St
'Bedding of Gravel 3/8" and Geotextile surrounding in pipes (dia 450 mm Ø- UPVC Pipes-Class 4 ) fo
Level and Location for RETAINING WALL Blinding under foundation at Axis 0B to 02O (as highlighted) Zo
Level and Location for Mass concrete of Strip Footing Between PC 44-46 Zone 1G (as highlighted)
Concreting for RETAINING WALL Blinding under foundation at Axis 0B to 02O (as highlighted) Zone 6
Shuttering for RETAINING WALL Blinding under foundation at Axis 0B to 02O (as highlighted) Zone 6
Level and Location for Infill wall (INNER) axis 02/I to 02/H (as highlighted) Zone 2C
Shuttering of Mass concrete of Strip Footing Between PC 44-46 Zone 1G (as highlighted)
Anti Termite application under Blinding of Strip Footing Between PC 44-46 Zone 1G (as highlighted)
Steel Reinforcements for Infill wall (outer) axis 02/F to 02/E (as highlighted) Zone 2B (1stSTAGE )
Protection layer of 4mm thick bituminous protection board for Strip footing between PC 143-145 (as hi
Shuttering for Infill wall (INNER) axis 02/I to 02/H (as highlighted) Zone 2C
Concreting for Infill wall (INNER) axis 02/I to 02/H (as highlighted) Zone 2C
Steel Reinforcements for walls at Large Mosque, Axis C,1-2 zone 1G (as highlighted)
Single layer of 4mm thick modified bituminous water proofing membrane for Strip footing between PC
Surface Preparation and Solvent Base Primer Strip footing between PC 143-145 (as highlighted) Zone 2H
Steel Reinforcements for Wall 2 & C* (as highlighted) upto 869.100 for internal building Zone 1N 1P
Excavation for Fire Water Line at Zone-L including Pit L/F/12, L/F/14 - as highlighted
Inspection of Installation and Alignment for the Crescent 01 Zone 3 1F from Axis 01P to 01S.
'Pipe Installation of Strom Water pipe OUT FALL-G for (PP 600 mm Ø- UPVC Pipes-Class 4 ) for Storm
'Bedding of Gravel 3/8" and Geotextile surrounding in pipes (PP 600 mm Ø- UPVC Pipes-Class 4 ) for
Steel Reinforcements for South Small Mosque Ground floor Slab On Grade (as highlighted)
Two layer of 4mm thick modified bituminous waterproofing membrane for MCPE 2 inner wall with counter
Concreting for South Small Mosque Ground floor Slab On Grade (as highlighted)
Steel Reinforcements for MCPE 2 Counter fort (inner) at axis 02AD to 03L As highlighted
Level and Location for Infill wall inner axis 02/K to 02/J (As highlighted) ZONE 2D (2nd STAGE )
Steel Reinforcements for Infill wall (INNER) axis 02/P to 02/Q (as highlighted) Zone 2E (1st STAGE )
Level and Location for Infill wall for Zone 2A, 2B between Axis 02-1, 02-2 02D (AS HIGHLIGHTED)
Shuttering for Infill wall for Zone 2A, 2B between Axis 02-1, 02-2 02D (AS HIGHLIGHTED)
Surface Preparation Prior to start Backfilling for MCPE 2 wall inner axis AA-E (as highlighted) zone 2H
Surface Preparation Prior to start Backfilling at MCPE 3 Axis 02P to 02S Zone 2E (as highlighted)
Level and Location for Infill wall inner axis 02/K to 02/L (As highlighted) ZONE 2D (2nd STAGE )
Inspection and compaction test 7th layer for backfilling at MCPE 2 Zone 2H axis 02/AB to 02/AA (as high
Protection layer of 4mm thick bituminous protection board for MCPE 2 inner wall with counter fort at a
Inspection and compaction test 8th layer Backfill for MCPE 3 Inner wall Axis 03A to 02S (as highlighted)
Protection layer of 4mm thick bituminous protection board for RC Strip Footing between PC 20-22 (as h
Single layer of 4mm thick modified bituminous waterproofing membrane for RC Strip Footing between
Surface preparation & Base primer coating for RC Strip Footing between PC 20-22 (as highlighted) Zon
Concreting for Infill wall (INNER) axis 02/N to 02/M (as highlighted) Zone 2D (2nd STAGE )
Shuttering for Infill wall (INNER) axis 02/N to 02/M (as highlighted) Zone 2D (2nd STAGE )
Level and Location for Infill wall (INNER) axis 02/N to 02/M (as highlighted) Zone 2D (2nd STAGE )
Inspection and compaction test 1st layer for backfilling for footing at Diaphagm wall grid 02/AR Zon
Installation of EMT Conduit (Dia. 3/4) and Box for Fire Alarm (Speaker, Flashing Beacon, Break G
Inspection of Concrete Encasement for Crossing pipe on Telecommunication and Fire & Securtiy Line at
Surface Preparation prior to start backfilling gravel around MV Line Pit C/MV/04 at Zone-C (As Highlight
Concrete Pouring for Typical Infill Precast Panels, at Grid (A/15-20), Inside Butterfly Garden, as highl
Inspection of backfilling gravel 1st Layer (1 of 1) for Duct Bank of Fire & Security line between B/FS/21
Steel Reinforcement for Typical Infill Precast Panels, at Grid (A/15-20), Inside Butterfly Garden, as hi
Concrete Pouring & Shuttering for Footings of Boundary Wall @ Grid (28-30/M-N & Q-R) (Remaining par
Inspection and Compaction Test for backfilling Sub-grade 3rd & 4th Layer (4 of 4) beside the Storm Wate
Coordinates & Levels for Footings of Boundary Wall @ Grid (28-30/M-N & Q-R) (Remaining parts), at E
Excavation and Blinding Levels for Low Current Handholes (MH/PG/LC/11, 13, 14, 15 & 16) and Fire Al
Excavation and Blinding Levels for Electrical Handholes of Low Voltage (MH/PG/LV/09, 10, 11 & 12)
Sand Bedding for Water Feature Lines (200mm HDPE), Between Boat garden & Aviary Garden, Inside W
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 4) around Potable Water Line Pi
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 4 layers) for water featur
Surface Preparation prior to start backfilling around Potable Water Line Pit for B/PW/11 - as highlighted.
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 4) around MV Line Pit C/MV/04
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 2) above Sand Covering for Fir
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 2) above Sand Covering for Po
Surface Preparation prior to start backfilling around Fire Water Line Pit for L/F/01, L/F/02, L/F/03, L/F/0
Surface Preparation prior to start backfilling around Potable Water Line Pit for L/PW/01, L/PW/02, L/PW
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 4) beside the Storm Water Line
"Inspection and Compaction Test for backfilling Sub-grade 5th Layer (5 of 7) around the Potable Water
Inspection and Compaction test for backfilling Sub-grade 2nd Layer (2 of 6) around Fire Water Line Pit fo
Inspection of Backfilling Sub-grade 3rd Layer (3 of 5) For Foul Water Line From FW-A-6 to FW-A-4 - As
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 2) above Sand Covering for N
Inspection and Compaction test for backfilling sub-grade 1st Layer (1 of 4) for Telecommunication and F
"INSPECTION FOR INSTALLATION OF STORM WATER LINE GULLIES G-O-46, G-O-47 - as highlighted "
Shuttering for C* & Wall 2 (as highlighted) upto 869.100 for internal building Zone 1N 1P
Pre-Assembly Bolt Tightening Inspection of Crescent 01, Zone 1 - 1K from Axis 01AE, 01AF & 01AG
Pre-Assembly Bolt Tightening Inspection of Crescent 01, Zone 1 - 1K from Axis 01AC, 01AD-1 & 01AD-
Level and Location for MCPE 1 wall (inner) at axis 03R to 03S (As highlighted) 871.00 - 875.85
Primary Inspection For Installation Tents For Aviary - PTFE 1150 .As per High lighted Attached Appr
INSPECTION FOR INSTALLATION OF SLAB FOR MH-O-02 (As Highlighted)
"INSPECTION FOR INSTALLATION OF ALL RINGS (RISER) AND SLAB FOR MH-O-04, MH-O-06 (As Highlighte
INSPECTION FOR MANHOLE BASE INSTALLATION AND UPVC PIPE CONNECTION FOR - MH-O-04, MH-O-06 (
Inspection for Casting the Blinding Concrete under the Foull Water Line Manhole FW-A-3-1, FW-A-3, FW
Inspection of Sand Covering Layer for Protection of MV Line from (B/MV/01 to B/MV/15, B/MV/15 to
Inspection of Concrete Encasement for Crossing pipe on Telecommunication and Fire & Securtiy Line at
Inspection of Sand bedding under pipe for RO Water Line at Zone H&L - As highlighted (Stock Pile # 132
Inspection of Sand bedding under pipe for Non-Potable Water Line at Zone H&L - As highlighted (Stock P
"Inspection and Compaction Test for backfilling Sub-grade 4th Layer (4 of 7) around the Potable Water
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 6) around Fire Water Line Pit fo
Inspection of Backfilling Sub-grade 2nd Layer (2 of 5) For Foul Water Line From FW-A-6 to FW-A-4 - As
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 4) around MV Line Pit C/MV/04
Inspection for Blinding Concrete under Non-Potable Water Line Isolation Pit for NPW-ISC-24, NPW-ISC-2
Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 6) around MV Line Pit C/MV/02
Inspection and Compaction test for backfilling Sub-grade 3rd Layer (3 of 4) around MV Line Junction P
Inspection for Installation of Fire & Security Line Pit - B/FS/05, C/FS/10, C/FS/09, C/FS/13, C/FS/08, C/F
Inspection for Installation of Telecommunication Line Pit - B/TL/43, B/TL/50, C/TL/12, C/TL/11, C/TL/15,
Inspection of Steel Reinforcement for the Footing and Walls of SBC-08 - Wing Wall (Left Side) - As Highl
Inspection & Compaction tests of 9th (Final) Layer (Sub Base) Backfilling (after 8 layers of Sub Grade
Concrete Pouring & Shuttering for Concrete Pads (3 no's) on Slab (level +872.50) of Wet Well F, Insi
Steel Reinforcement for Footings of Boundary Wall @ Grid (28-30/M-N & Q-R), at Energy Center 2, as
Concrete Pouring & Shuttering for Walls of Seat Walls (Inner), Inside Physic Garden as highlighted are
Concrete Pouring & Shuttering for walls of New ticketing booth # 4A, As per Attached Highlighted Dra
Coordinates & Levels for Concrete Pads (3 no's) on Slab (level +872.50) of Wet Well F, Inside Water G
Coordinates & Levels for Walls of Seat Walls (Inner), Inside Physic Garden as highlighted area in atta
Coordinates & Levels of walls for New ticketing booth # 4A, As per Attached Highlighted Drawing's.
Inspection of First Layer Block Layout Inside Staircase room (GF-5076) at Grid (7-8/F-H), at Manageme
Grouting for Stone Cladding on Column's C19 & C20 (All Sides), As per Attached Highlighted Drawing's
Concrete Pouring for Blinding under Low Current Handhole (MH/PG/LC/03) Inside Physic Garden as hi
Concrete Pouring for Blinding under Electrical Handholes of Low Voltage (MH/PG/LV/03), Inside Physi
Excavation and Compaction tests for Water Feature Lines (200mm HDPE), Between Boat garden & Aviary
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 3 layers) Surround Low
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 3 layers) Surround Elect
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 4 layers) for water featur
Pipe Sleeves Installation of Outer infill Wall Mechanical (FW) From Axis (02B,02/CTO to 02/D ) At C
Pipe Sleeves Installation of Outer infill Wall Mechanical CHW (S&R) From Axis (02/2C to 02/D ) At C
"Inspection and compaction test 7th layer (Subgrade) for backfilling for MCPE 3 (S.O.G) axis 02 P to 02 S
Inspection and compaction test 7th layer Backfill for MCPE 3 Inner wall Axis 03A to 02S (as highlighted)
Inspection and compaction test 1st & 2nd layer for Backfilling around PC 25 Zone 2E (as highlighted) axis
Concreting for Buttress (with beam ), BOI ( 58 ) , BII (58) zone 1P (as highlighted)
Level and Location for Buttress (with beam ), BOI ( 58 ) , BII (58) zone 1P (as highlighted)
Shuttring and Shear connector for Buttress (with beam ), BOI ( 58 ) , BII (58) zone 1P (as highlighted)
Level and Location for Infill wall for Zone 2A between Axis 02-1, 02A-02B-02C (AS HIGHLIGHTED) level 8
Concreting for MCPE 2 Wall (inner) & counterfort Axis 02AE-02AD Zone 2J As highlighted
Protection layer of Geotex and 30mmScreed under Strip Footing between PC 158-152 (as highlighted) Z
Shuttering for MCPE 2 Wall (inner) & counterfort Axis 02AE-02AD Zone 2J As highlighted
Level and Location for MCPE 2 Wall (inner) & counterfort Axis 02AE-02AD Zone 2J As highlighted
Steel Reinforcements for Infill wall (INNER) axis 01/H to 01/I (as highlighted) Zone 1C (1st STAGE )
level and location for Infill wall KICKER (INNER) axis 02/AB to 02/AA (as highlighted) Zone 2H
Shuttering for Infill wall KICKER (INNER) axis 02/AB to 02/AA (as highlighted) Zone 2H
Steel Reinforcements for Infill wall KICKER (INNER) axis 02/AB to 02/AA (as highlighted) Zone 2H
Concreting for RC Strip Footing grid 02/O to 02/N zone 2E (as highlighted)
Shuttering for RC Strip Footing grid 02/O to 02/N zone 2E (as highlighted)
Level and Location for RC Strip Footing grid 02/O to 02/N zone 2E (as highlighted)
Protection layer of 4mm thick bituminous protection board under center bridge abutment foundation gr
Two layer of 4mm thick modified bituminous waterproofing membrane under center bridge abutment fo
Steel Reeinforcements for RC Strip Footing grid 02/O to 02/N zone 2E (as highlighted)
Surface preparation & Base primer coating under center bridge abutment foundation grid 02/AK (as h
Steel Reinforcements for Infill wall (INNER) axis 02/O to 02/P (as highlighted) Zone 2E (2nd STAGE )
Surface preparation & Base primer coating for under Strip Footing between PC 158-152 (as highlighted
Single layer of 4mm thick modified bituminous waterproofing membrane under Strip Footing between
Steel Reinforcements for walls at Large Mosque, Axis C-F, 1-2 & C-F,5-6 zone 1G (as highlighted)
Installation of Weatherproof Box( 400x400mm -1pc. & 10x10 mm - 1 pc.) and straight PVC conduit 3
Shuttering for mass concrete (2nd layer) for Central Bridge foundation Zone 4 grid 1M (as highlighted
Installation and Survey Report for Location and Levels of Anchor Bolts for RING BEAM Zone 1N (OUTER)
Installation and Survey Report for Location and Levels of Anchor Bolts for RING BEAM Zone 1N (INNE
Surface Preparation and Paint Touch Up Inspection for the Metal Cladding in Crescent 02, Zone-6 2E f
Inspection Of Pipe Installation For Non-Potable Water (Irrigation Line ); (315mmØ- UPVC-Claas-5 );
Inspection of Alignment for the Installed Baseplates in Crescent 02 Zone 3 - 2N Partition Wall
Final Inspection for the Crescent 02, Zone 4 - 2k 7 2J from Axis 02AH to 02AB.
Inspection of Installation, Alignment and Bolt Tightening for the Metal Cladding in Crescent 02 Zone 6
Final Inspection for the Crescent 01, Zone 5 - 1B & Zone 4 - 1C & 1D from Axis 01D to 01M.
Final Inspection for the Crescent 02, Zone 6 - 2N from Axis 02J to 02N.
Final Alignment Inspection for the Aviary Garden from Grid Lines 1 to 23.
Preliminary Inspection of Erected Steel in Crescent 01, Zone 3 1F from Axis 01P to 01S as per the hig
Surface Preparation and Solvent base primer for MCPE 1 Wall (as highlighted) Zone 2N 2M, axis 03R, 03-
"Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 7) around the Potable Water
Installation of Main Fire Water Pipes (160mmØ-UPVC-Class-5) From Point (648434.97 East & 271375
Installation of Main Potable Water Pipes (dia 800mmØ-UPVC-Class-5) at Zone L- From Point (648435.
' Warning Tape Installation of Foul Water Line for (dia 400mmØ - UPVC- Class 4) from (FW-A-4 to FW
' 300 mm Gravel 3/8" Backfilling and Geotextile of Foul Water Line for (dia 400mmØ - UPVC- Class 4
' Warning Tape Installation in pipes OUT FALL-O for (PP 600&800 mm Ø- UPVC Pipes-Class 4 ) for St
' Gravel 3/8" Backfilling and Geotextile in pipes OUT FALL-O for (PP 600&800 mm Ø- UPVC Pipes-Clas
Inspection and Compaction Test for backfilling Sub-grade 8th Layer (8 of 9) under Cesspool-3 at Zone-D -
"INSPECTION FOR INSTALLATION OF ALL RINGS (RISER) FOR MH-O-02, MH-O-05 (As Highlighted) "
"INSPECTION FOR INSTALLATION OF ALL RINGS (RISER) AND SLAB FOR MH-O-03 (As Highlighted) "
INSPECTION FOR MANHOLE BASE INSTALLATION AND UPVC PIPE CONNECTION FOR - MH-O-02, MH-O-03,
Inspection of Sand bedding under pipe for RO Water Line at Zone C - As highlighted (Stock Pile # 132)
Inspection of Sand bedding under pipe for Non-Potable Water Line at Zone C - As highlighted (Stock Pile
Inspection for Casting the Blinding Concrete under the Gullies for G-O-28, G-O-29, G-O-32, G-O-33, G-O
"Inspection and Compaction Test for backfilling Sub-grade 4th Layer (4 of 6) around MV Line Pit B/MV
"Excavation for Storm Water Line from MH-M-04 to MH-M-03 including Manhole MH-M-04, MH-M-03 -
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 2) above Sand Covering for No
Inspection of Concrete Pouring for Wall of MV Line Pulling Pit - G/MV/09 G/MV/34, G/MV/35 at Zone-G
Inspection of Formwork for Wall of MV Line Pulling Pit - G/MV/09 G/MV/34, G/MV/35 at Zone-G (As Hig
Inspection of Backfilling Sub-grade 1st Layer (1 of 8) For Foul Water Line From FW-A-6 to FW-A-4 - As H
"Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 7) around the Potable Water
Inspection for Installation of MV Line Junction Pit - B/MV/19, C/MV/04, G/MV/06 - as highlighted
Inspection of Concrete Pouring for the Footing of SBC-08 - Wing Wall (Left Side) - As Highlighted
Inspection of Formwork for the Footing of SBC-08 - Wing Wall (Left Side) - As Highlighted
Surface Preparation prior to start backfill gravel for Duct Bank of Fire & Security line between B/FS/21
"Surface Preparation prior to start backfilling Gravel for the Duct Bank of Telecommunications Line fr
Surface Preparation prior to start Water Proofing for Duct Bank of Fire & Security line from K/FS/07 to
Surface Preparation prior to start Water Proofing for Duct Bank of Telecommunications line from K/TL/2
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 2) above Sand Covering for Fir
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 2) above Sand Covering for Pot
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 2) above Gravel for the Duct
Concrete Pouring for Blinding under Footings & Grade Beams @ Grid (5-13/C-I), at Energy Center 2, as
Steel Reinforcement for Beams (At level +872.35) of Boundary Wall @ Grid (18-28/R), at Energy Center
Concrete Pouring & Shuttering for Kicker's (Both Inner & Outer) of Boundary Wall at Span 12, at Wate
Coordinates & Levels of Blinding under Footings & Grade Beams @ Grid (5-13/C-I), at Energy Center 2,
Coordinates & Levels for Kicker's (Both Inner & Outer) of Boundary Wall at Span 12, at Water Garden,
Mockup for Foux Rock (Industrial Rock) Hardscape Sculpture from Replica Theming Industries LLC, as
Inspection and compaction test 6th layer Backfill for MCPE 3 Inner wall Axis 03A to 02S (as highlighted)
Inspection and compaction test 5th & 6th layer for backfilling for TUNNEL 2(between axis 02-T & 02-S)
Inspection and compaction test 5th & 6th layer for backfilling at MCPE 2 Zone 2H axis 02/AB to 02/AA (
Surface Preparation Prior to start Backfilling for Devonian Garden (as highlighted) Zone 2M
Surface Preparation Prior to start Backfilling around PC 25 Zone 2E (as highlighted) axis 02R
Final Inspection for the Crescent 02, Zone 3 - 2N, from Axis 02AP to 02AT
Final Inspection for the Crescent 02, Zone 7 - 2B & 2C, from Axis 02D to 02J
Level, Location of Central Bridge Abutment Foundation (as highlighted) Zone 4 Grid 02AK
Level and Location for RING BEAM Zone 1N (OUTER) Axis 01-1, 01AM to 01AP (as highlighted)
Level and Location for RING BEAM Zone 1N (INNER) Axis 01-1, 01AM to 01AP (as highlighted)
Level and Location for Mass Concrete (3rd layer) under Strip Footing Between PC 21-23-25 Zone 1D (as
Concreting for Central Bridge Abutment Foundation (as highlighted) Zone 4 Grid 02AK
Shuttering for Central Bridge Abutment Foundation (as highlighted) Zone 4 Grid 02AK
Steel Reinforcements for Central Bridge Abutment Foundation (as highlighted) Zone 4 Grid 02AK
Shuttering and Scaffoldings for RING BEAM Zone 1N (OUTER) Axis 01-2, 01AM to 01AP (as highlighted)
Steel Reinforcements for RING BEAM Zone 1N (OUTER) Axis 01-2, 01AM to 01AP (as highlighted)
Shuttering & scaffoldings for RING BEAM Zone 1N (INNER) Axis 01-1, 01AM to 01AP (as highlighted)
Inspection and Compaction Test for backfilling Sub-grade 1st & 2nd Layer (2 of 4) beside the Storm Wate
"Surface Preparation after removal of Manhole installed by old contractor, prior to start backfill sub-g
Inspection and Compaction test for backfilling Sub-grade 2nd Layer (2 of 4) around MV Line Junction P
Inspection and Compaction Test for Backfilling Sub-grade 9th Layer (9 of 12) above Gravel around Manh
Inspection of backfilling Gravel 1st Layer (1 of 1) for the Duct Bank of MV Line from B/MV/09 to B/MV/2
Surface Preparation prior to start backfill gravel for the Duct Bank of MV Line from B/MV/09 to B/MV/2
Inspection of Concrete Pouring for Footing of MV Line Pulling Pit - H/MV/11 at Zone-H (As Highlighted)
Inspection of Formwork for Footing of MV Line Pulling Pit - H/MV/11 at Zone-H (As Highlighted)
Inspection of Steel Reinforcement for Footing and Wall of MV Line Pulling Pit - H/MV/11 at Zone-H (As H
Surface Preparation prior to start backfilling around Fire Water Line Pit for F/F/10 - as highlighted.
Inspection of Sand bedding under pipe for Fire Water Line at Zone-L - as highlighted (Stock Pile # 132) (
Steel Reinforcements for RING BEAM Zone 1N (INNER) Axis 01-1, 01AM to 01AP (as highlighted)
Excavation for Fire Water Line at Zone-L including Pit L/F/12, L/F/14 - as highlighted (Red Line)
Steel Reinforcements for Infill wall for Zone 2A, 2B between Axis 02-1, 02-2 02D (AS HIGHLIGHTED)
Shuttering of Mass Concrete (3rd layer) under Strip Footing Between PC 21-23-25 Zone 1D (as highlight
Concreting for MCPE 1 wall (inner) at axis 03R to 03S (As highlighted) 871.00 - 875.85
Shuttering for MCPE 1 wall (inner) at axis 03R to 03S (As highlighted) 871.00 - 875.85
Excavation for RO Water Line at Zone C,H & L including Pit RO-ISC-08, RO-ISC-10, RO-ISC-09, - As highli
Pre-Assembly Bolt Tightening Inspection of Crescent 01, Zone 1 - 1L, from Axis 01AG & 01AH
Excavation for Non-Potable Water Line at Zone C,H & L including Pit POC-18, NPW-ISC-25, POC-33, POC
Excavation for Telecommunication Line Branch at Zone-B&C - as highlighted in the attached drawing
"Inspection and Compaction Test for backfilling around the Potable Water Line Pit - F/PW/08 , F/PW/02
Inspection of Concrete Encasement for Crossing pipe on Telecommunication and Fire & Securtiy Line at
Inspection and Compaction Test for backfilling Sub-grade 7th Layer (7 of 9) under Cesspool-3 at Zone-D -
Inspection of Concrete Pouring for Side Walls of MV Line Pulling Pit - C/MV/08, C/MV/38, G/MV/02 at
Grouting of Installed Anchor bolt and under Baseplate at Zone 1L INNER & OUTER ring beam (as highl
Grouting of Installed Anchor bolt and under Baseplate at Zone 1L INNER & OUTER ring beam (as highl
Concreting for RING BEAM Zone 1M (INNER) Axis 01-1, 01AJ to 01AM (as highlighted)
Inspection of Formwork for Side Walls of MV Line Pulling Pit - C/MV/08, C/MV/38, G/MV/02 at Zone-C&G
Concreting for Staircase, Shaft Opening & ground beam for Large Mosque ZONE 1G (as highlighetd) at gri
Inspection of backfilling Gravel 1st layer (1 of 1) for MV Line from F/MV/06 to F/MV/11 at Zone- F - As H
Inspection for Blinding Concrete under Fire Water Line Pit for B/F/14 at Zone-B - as highlighted
Inspection for Blinding Concrete under Potable Water Line Pit G/PW/03 - as highlighted
Inspection of Blinding Concrete under MV Line Pit C/MV/04 at Zone-C - as highlighted
Inspection of Concrete Pouring for Footing of MV Line Pulling Pit - H/MV/29, H/MV0/6, H/MV/04 at Zone
Inspection of Formwork for Footing of MV Line Pulling Pit - H/MV/29, H/MV0/6, H/MV/04 at Zone-H (As
Inspection and Compaction Test for Backfilling Sub-grade 8th Layer (8 of 12) above Gravel around Manh
Inspection and Compaction Test for backfilling sub-grade 1st Layer (1 of 2) above Gravel for the Duc
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 2) above Gravel for Duct Ban
"Inspection and compaction test 2nd layer (Subgrade) for backfilling for Devonian Garden Foul Water
"Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 6) around MV Line Pit B/MV
Excavation for Storm Water Line from MH-G-06 to near MH-G-07 including branch, Manhole MH-G-07 an
Inspection of Concrete Pouring for Canopy Column Neck of Seating Area (1) Zone-K (SA-16) - As Highligh
"Inspection of Formwork for Canopy Column Neck of Seating Area (1) Zone-K (SA-16) - As Highlighted"
Excavation and Blinding Levels for Low Current Handhole (MH/PG/LC/03) Inside Physic Garden as high
Excavation and Blinding Levels for Electrical Handholes of Low Voltage (MH/PG/LV/03), Inside Physic
Sand Bedding for Irrigation (Main, Sub & Sleeves) lines (part 4) ( 50, 110, 160 & 200 mm), Bottom Lef
Installation of Metal Grooves Complete for Exterior Elevation of Public Toilet # 3, At highlighted area
Application of Cementitious Water proofing (3rd coat final) for Boundary Wall (Inner & outer face),
Steel Reinforcement for Walls of Upstand above the Slab of Wet Well (E), Inside Water Garden as high
Steel Reinforcement for Precast Panel type 3, as Mockup (Location behind steel workshop) for Butterf
Concrete Pouring for Blinding under Foundation of Boundary Wall @ Grid (M/15-22), at Energy Center
Steel Reinforcement for Columns of Boundary Wall @ Grid (M/21-28), at Energy Center 2, as highlight
Steel Reinforcement for Slab of Wet Well (E), Inside Water Garden as highlighted area in attached dra
Inspection for Window and Door openings for New Ticketing Booth # 4A As per Attached Highlighted
Excavation & Bed preparation for Low Current Lines of Telecom (from MH/ZG/TC/06 to 07), at Maze G
Inspection & Compaction tests of 6th Layer (Sub-Grade) Backfilling (Out of 7 layers) in Between the Fo
Concrete Pouring for Blinding under Low Current Handholes (MH/PG/LC/ 02,04,05,06,07,08,17) & Fire
Concrete Pouring for Blinding under Electrical Handholes of Low Voltage (MH/PG/LV/ 02,04,05,06) &
Excavation and Bed preparation for Irrigation (Main, Sub & Sleeves) lines (part 4) ( 50, 110, 160 & 2
3rd (final) Coat Cementitious water proofing for Kicker Top & Wall (upto above 15cm from FGL) of Pl
Setting out of Groove for Exterior Elevation Prior to install all Grooves for Public Toilet # 3, At highli
Concreting for walls (W10) and Isolated Circular Columns (C9 )at CAFETERIA zone 2A (as highlighted
Shuttering for Infill wall between PC 96-97 inner between Gridline 02AD- 02AE (As highlighted) ZONE 2J
Inspection Of Pipe Installation For Non-Potable Water (Irrigation Line ); (200mmØ- UPVC-Claas-5 ) (
Surface Preparation Prior to start Backfilling between PC 143 -145 above tunnel slab zone 2H Axis 02 A
Inspection and compaction test 3rd & 4thlayer for backfilling for TUNNEL 2(between axis 02-T & 02-S) z
Inspection and compaction test 3rd & 4th layer for backfilling at MCPE 2 Zone 2H axis 02/AB to 02/AA (
Concreting for Infill wall (INNER) axis 02/L to 02/M(as highlighted) Zone 2D (2nd STAGE )
Shuttering for Infill wall (INNER) axis 02/L to 02/M(as highlighted) Zone 2D (2nd STAGE )
Level and Location for Infill wall (INNER) axis 02/L to 02/M(as highlighted) Zone 2D (2nd STAGE )
Excavation for retaining wall from axis 01/B to 02/0 Zone 6 & 7 (as highlighted)
Shuttering for South Watch Tower Wall (internal & external) (858.9 to 860.70) (as highlighted) Zone 7
Concreting for South Watch Tower Wall (internal & external) (858.9 to 860.70) (as highlighted) Zone 7
Shuttering for MCPE 2 Wall (inner) & counterfort Axis 02AE-02AF Zone 2J 2K As highlighted 871.00
Concreting for MCPE 2 Wall (inner) & counterfort Axis 02AE-02AF Zone 2J 2K As highlighted 871.00
Level and Location for MCPE 2 Wall (inner) & counterfort Axis 02AE-02AF Zone 2J 2K As highlighted 87
Level and Location for South Watch Tower Wall (internal & external) (858.9 to 860.70) (as highlighted)
Level and Location for C* & Wall 2 (as highlighted) upto 869.100 for internal building Zone 1N 1P
Installation of Weatherproof Box( 400x400mm -1pc. & 10x10 mm - 1 pc.) and straight PVC conduit 32
Installation of PVC Conduit sleeve (Dia. 25mm) for Fire Alarm (Flashing Beacon) at Site Tower -2 as per
Installation of straight UPVC Conduit (2x110mm) Low Current Ductbank (Fire and Security) from Han
Installation of straight UPVC Conduit (4x110mm) Low Current Ductbank (TELECOM) from Handhole C/TL
Inspection of Installation and Alignment for the Crescent 02 Zone 6 2F from Axis 02R to 02U.
Inspection of Plastering for Internal Walls at IT CupBoard (GF-5007) at Grid (16-18/O-Q), Inside Mana
Application of Cementitious Water proofing (2nd coat ) for Boundary Wall (Inner & outer face), Span
Concrete Pouring for Slab on Grade (SOG) Inside Staircase room (GF-5076) at Grid (7-8/F-H), at Mana
Inspection of Installation, Alignment and Bolt Tightening for the metal cladding in crescent 02 Zone -
Steel Reinforcement for Slab on Grade (SOG) Inside Staircase room (GF-5076) at Grid (7-8/F-H), at M
Installation of straight PVC Conduit (Dia.25mm) and Box for Fire Alarm (Speaker) at Infill Wall betwe
Surface Preparation and Paint Touch Up Inspection in Crescent 02 Zone 6, 2E from Axis 02R to 02N (As
Steel Reinforcement for walls of New Ticketing Booth # 4A, As per Attached Highlighted Drawing's.
Steel Reinforcement for Columns of Boundary Wall @ Grid (L/5-14), at Energy Center 2, as highlighted
Surface Preparation and Paint Touch Up Inspection for the Metal Cladding in Crescent 02, 2H from Ax
Concrete Pouring & Shuttering for Footings of Boundary Wall @ Grid (6-12B/A), at Energy Center 2, as
Preliminary Inspection of Erected Steel in Crescent 01, Zone 3 1G from Axis 01S to 01W (As per the Hi
Steel Reinforcement for Precast Panel Type-1 (8 no's), Type-2 (5 no), Type-3 (1 no's) & Type-4 (1 no's
Bolt Tightening Inspection of Crescent 02, Zone 6 - 2F from Axis 02V to 02R (As per the Highlighted Ar
Inspection of Alignment for the Installed Baseplates in Crescent 01 Zone 1 - 1L Outer & Inner
Steel Reinforcement for Walls of Seat Walls (Inner), Inside Physic Garden as highlighted area in attac
Concrete Pouring & Shuttering for Slab of Wet Well F, (at Level +872.50), Inside Water Garden as hig
Concrete Pouring & Shuttering for Footings of Seat Walls (08 no's) inside Butterfly Garden, as highlig
Coordinates & Levels of Footings for Seat Walls (08 no's) inside Butterfly Garden, as highlighted area
Final Inspection for the Crescent 02, Zone 4 - 2L, from Axis 02AH to 02AL
Inspection & Compaction Tests of 2nd (Final) layer Backfilling (Sub-Grade) (Out of 2 Layers) Along Ci
Final Inspection for the Crescent 02, Zone 3 - 2M, from Axis 02AL to 02AP
Sand Bedding for Irrigation Sub-main Line Distribution network (Part 3) (50,110 mm),(East of Geyser
Sand Bedding for Low Current Lines of Fire Alarm & Security (From MH/WG/FA/01 to 03) Inside Mist G
Sand Bedding for Electrical Lines of Low Voltage (MH/WG/LV/01 to 03 & 04 to 08), Inside Mist Garden
Surface Preparation and Paint Touch Up Inspection in Crescent 02 Zone 6, 2F from Axis 02V to 02R (As
Surface Preparation and Compaction Tests Prior to Backfilling for Support from bothside for Sand Cove
1st Layer Gravel Backfilling Surround the Manholes (2 nos) , (MH-D-07-03), and (MH-D-07-01-01B) , at
Surface Preparation Prior to Backfilling Surround Low Current Handholes (Inside Light Garden) of T
Surface Preparation Prior to Backfilling Surround Electrical Handholes (Inside Light Garden) of Lo
Level and Location for mass concrete under strip footing (2nd layer) between PC( 21-23-25 )outer Zone
Level and Location for Infill wall axis 02/AM to 02/AN (as highlighted) Zone 2M
Steel Reinforcements for Infill wall (INNER) axis 02/I to 02/H (as highlighted) Zone 2C
Level and Location for Buttress with Beam BII 57 (with beam) upto 873.70 Zone 1P (as highlighted)
Concreting for Buttress with Beam BII 57 (with beam) upto 873.70 Zone 1P (as highlighted)
Shuttering for Buttress with Beam BII 57 (with beam) upto 873.70 Zone 1P (as highlighted)
Surface Preparation and Solvent Base Primer for Buttress BOV BOI 78 & 79 level upto 870.00 (as highlig
Protection layer of 4mm thick bituminous protection board for Buttress BOV BOI 78 & 79 level upto 870
Single layer of 4mm thick modified bituminous water proofing membrane for Buttress BOV BOI 78 & 79 l
Protection layer of 4mm thick bituminous protection board for Buttress BOV BOI 80-81 level upto 868.0
Single layer of 4mm thick modified bituminous water proofing membrane for Buttress BOV BOI 80-81 lev
Surface Preparation and Solvent Base Primer for Buttress BOV BOI 80-81 level upto 868.00 (as highlight
Protection layer of 4mm thick bituminous protection board for MCPE 3 wall inner Grid (03-1, 03-A to 02
Protection layer of 4mm thick bituminous protection board for diaphragm wall (1 side only) founation
Single layer of 4mm thic modified bituminous water proofing membrane for diaphragm wall (1 side only)
Surface preparation & Solvent base primer coating for diaphragm wall (1 side only) founation Zone 2N
' Pipe Installation of Foul Water Line for (dia 400mmØ - UPVC- Class 4) from (FW-A-4 to FW-A-6). At
'Bedding of Gravel 3/8" and Geotextile Surrounding Foul Water Line for (dia 400mmØ - UPVC- Class
Shuttering for mass concrete under strip footing (2nd layer) between PC( 21-23-25 )outer Zone 1D(as hi
Shuttering for Infill wall axis 02/AM to 02/AN (as highlighted) Zone 2M
'Warning Tape Pipe Installation For Non-Potable Water (Irrigation Line ); (200mmØ- UPVC-Claas-5 );
Inspection of Steel Reinforcement for Footing and Wall of MV Line Pulling Pit - H/MV/29, H/MV0/6, H/
"INSPECTION FOR INSTALLATION OF ALL RINGS (RISER) AND SLAB FOR MH-O-01 (As Highlighted) "
INSPECTION FOR MANHOLE BASE INSTALLATION AND UPVC PIPE CONNECTION FOR - MH-O-01 (As Highli
Inspection and Compaction test for backfilling Sub-grade around MV Line Junction Pit - B/MV/08, C/MV/
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 1) for the Duct Bank of MV L
Inspection of backfilling Gravel for the Duct Bank of Telecommunications Line from G/TL/44 to G/TL/50 -
Inspection of backfilling Gravel for the Duct Bank of Fire & Security Distribution Line from G/FS/08 to G
Inspection and Compaction Test for backfilling Sub-grade 4th Layer (4 of 7) around Non-Potable water li
Inspection for Blinding Concrete under Fire & Security Line Pit C/FS/46 at Zone-C - as highlighted
Inspection for Blinding Concrete under Telecom Line Pit C/TL/49 at Zone-C - as highlighted
Inspection for Installation of MV Line Junction Pit - B/MV/08, C/MV/30, C/MV/05, G/MV/22 - as highligh
Inspection of Sand bedding under pipe for RO Water Line at Zone-B- As highlighted (Stock Pile # 132)
Inspection of Sand Covering to protect the pipe for Non-Potable Water Line at Zone- G - as highlighted
Inspection and Compaction Test for backfilling sub-grade 6th Layer (6 of 6) for Foul Water Line betwe
"Inspection for Blinding Concrete under Footing of Storm Box Culvert - SBC-08 - Wing Wall (Left Side) -
"Surface Preparation prior to start backfilling around the Potable Water Line Pit - F/PW/08 , F/PW/02 -
Inspection of Sand bedding under pipe for Telecommunication Line between GTL/03 to F/TL/10 at Zone-
Inspection of Sand bedding under pipe for Fire & Security Distribution Line from G/FS/02 to F/FS/09 at
Inspection of Concrete Pouring for Side Walls of MV Line Pulling Pit - C/MV/40, G/MV/27, G/MV/03 at
Inspection of Formwork for Side Walls of MV Line Pulling Pit - C/MV/40, G/MV/27, G/MV/03 at Zone-C&G
Inspection and Compaction Test For Backfilling Subgrade 7th Layer (7 of 7) for Storm Water Line Fro
Inspection and Compaction Test for Backfilling Sub-grade 7th Layer (7 of 12) above Gravel around Manh
Excavation for Fire & Security Distribution Line at Zone-G including Pit G/FS/19 - as highlighted
Excavation for Telecommunication Line at Zone-G including pit G/TL/16 - as highlighted in the attached
Inspection of Sand bedding under pipe for Fire Water Line at Zone-G - as highlighted (Stock Pile # 132)
Inspection of Sand bedding under pipe for Potable Water Line at Zone-G - as highlighted (Stock Pile # 13
Inspection and Compaction Test for backfilling sub-grade 5th Layer (5 of 6) for Foul Water Line betwe
Excavation for Foul Water Line from FW-A-06 to FW-A-04 prior to start Gravel Bedding (as Highlighted)
"Inspection for the Excavation and Soil Preparation of Storm Box Culvert - SBC-08 - Wing Wall (Left Side
"Excavation for Fire Water Line near Plaza area at Zone-B including Pit B/F/14 - as highlighted "
Excavation for Potable Water Line near Plaza area at Zone-G including Pit G/PW/03 - as highlighted
Inspection for Blinding Concrete under Telecom Line Pit C/TL/27, Pit C/TL/71 at Zone-B - as highlighted
Inspection and Compaction Test for Backfilling Sub-grade 6th Layer (6 of 12) above Gravel around Manh
Inspection for Blinding Concrete under Fire & Security Line Pit C/FS/04, C/FS/06, C/FS/52 at Zone-B - as
Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 7) around Non-Potable water li
Inspection and Compaction Test for backfilling sub-grade 4th Layer (4 of 6) for Foul Water Line betwe
Inspection and Compaction Test for Backfilling Sub-grade 5th Layer (5 of 12) above Gravel around Manh
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 3) above Sand Covering to pr
Inspection and Compaction Test for backfilling Sub-grade 6th Layer (6 of 9) under Cesspool-3 at Zone-D -
Surface Preparation prior to start backfilling gravel around MV Line Pit F/MV/11 at Zone-C (As Highlight
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 7) around Non-Potable water l
Inspection and Compaction Test for backfilling Sub-grade 6th Layer (6 of 6) around Non-Potable water l
Inspection and Compaction Test for backfilling sub-grade 3rd Layer (3 of 6) for Foul Water Line betwe
Inspection of Excavation for RO Water Line at Area-B ARV-03- As highlighted
"Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 6) around MV Line Pit B/MV
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 2) above Sand Covering for
Inspection of backfilling Gravel 1st Layer (1 of 1) for the Duct Bank of MV Line from B/MV/09 to B/MV/
"Inspection of backfilling Gravel 1st Layer (1 of 1) for the Duct Bank of Telecommunications Line bet
Inspection of backfilling Gravel 1st Layer (1 of 1) for Duct Bank of Fire & Security line between B/RC-
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2of 6) around MV Line Pit C/MV/02
Surface Preparation prior to start backfilling around Fire & Security Line Pit F/FS/03, F/FS/04, F/FS/11
Inspection and Compaction Test For Backfilling Subgrade 6th Layer (6 of 6) for Storm Water Line Fro
Surface Preparation prior to start backfill gravel for Duct Bank of Fire & Security line between B/RC-F
"Surface Preparation prior to backfilling Gravel for the Duct Bank of Telecommunications Line betwee
Surface preparation prior to start backfilling Gravel for the Duct Bank of MV Line from B/MV/09 to B/
Inspection of Concrete Pouring for Wall of MV Line Pulling Pit H/MV/02, H/MV/09, H/MV/25 at Zone-H (
'Pipe Installation of Strom Water pipe OUT FALL-O for (PP 600&800 mm Ø- UPVC Pipes-Class 4 ) for
Inspection of Formwork for Wall of MV Line Pulling Pit H/MV/02, H/MV/09, H/MV/25 at Zone-H (As High
Inspection for Installation of MV Line Junction Pit - F/MV/09 - as highlighted
Inspection of Concrete Pouring for Footing of MV Line Pulling Pit - G/MV/07, H/MV/24, H/MV/28 at Zon
Inspection of Formwork for Footing of MV Line Pulling Pit - G/MV/07, H/MV/24, H/MV/28 at Zone-G&H (
Inspection of Steel Reinforcement for Footing and wall of MV Line Pulling Pit - G/MV/07, H/MV/24, H/
Surface Preparation prior to start backfilling sub-grade for MV Line from F/MV/06 to F/MV/11 at Zone- F
'Bedding of Gravel 3/8" and Geotextile surrounding in pipes (PP 600&800 mm Ø- UPVC Pipes-Class 4 )
Inspection and Compaction Test for Backfilling Sub-grade 4th Layer (4 of 12) above Gravel around Manh
Inspection and Compaction Test for Backfilling Sub-grade 5th Layer (5 of 5) above Gravel around the
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 3) above Gravel For Manhole F
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 2) above Sand Covering for M
Inspection and compaction test 2nd & 3rd layer Backfill for PC and STRIP FOOTING between PC 16-18 Zo
"Inspection and compaction test 5th & 6th layer (Subgrade) for backfilling for MCPE 3 (S.O.G) axis 02 P t
"Excavation for Non-Potable Water Line near Plaza Area at Zone C - As highlighted (Red Line)"
Inspection and compaction test 1st & 2nd layer for backfilling at MCPE 2 Zone 2H axis 02/AB to 02/AA (
"Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 6) around MV Line Pit B/MV
Inspection and Compaction Test for backfilling sub-grade 2nd Layer (2 of 6) for Foul Water Line betw
Inspection of Sand bedding under pipe for Non-Potable Water Line near Plaza Area at Zone C - As highlig
Inspection and compaction test 1st & 2nd layer for backfilling for TUNNEL 2(between axis 02-T & 02-S)
Surface Preparation Prior to start Backfilling for footing at Diaphagm wall grid 02/AR Zone 2N (as highli
Concreting for Infill Wall at Zone 2R TIP UPTO 870.15 (as highlighted)
Level and Location for Infill wall between between Gridline 02AQ-02AR (As highlighted) ZONE 2N
Steel Reinforcements for Infill wall (INNER) axis 02/N to 02/M (as highlighted) Zone 2D (2nd STAGE )
Shuttering for Infill wall between between Gridline 02AQ-02AR (As highlighted) ZONE 2N
Steel Reinforcements for Infill wall for Zone 2A between Axis 02-1, 02A-02B-02C (AS HIGHLIGHTED)
Shear Connectors (implant) for BUTTRESS BIV BOV 63 Zone 2B
Installation and survey report for location and levels of anchor bolts for Ring beam zone 2F (outer) ax
Installation and survey report for location and levels of anchor bolts for ring beam zone 1M (outer) a
Inspection and compaction test 1st layer for backfilling for Retaining wall Zone 1 (as highlighted) (1st o
Surface Preparation Prior to start Backfilling for TUNNEL 2(between axis 02-T & 02-S) zone 2G as highlig
Surface Preparation Prior to start Backfilling at MCPE 2 Zone 2H axis 02/AB to 02/AA (as highlighted)
2nd Coat Cementitious water proofing for Kicker Top & Wall (upto above 15cm from FGL) of Plant Roo
Single Layer 4mm thk. Modified Bitumenous Membrane water proofing for Foundation of Boundary wall
Protection layer of 4mm thick bituminous protection board for Foundation of Plant Room (Outer sides
Concrete Pouring for Blinding under Foundation of Cabin Room, ETFE Pump Room, Water feature Pump
Concrete Pouring & Shuttering for Columns of Boundary Wall @ Grid (17-22/M), at Energy Center 2, as
Installation of EMT Conduit (Dia. 3/4) and Box for Voice and Data ( Data, WIFI, Telephone) at Man
Steel Reinforcement for Footings of Boundary Wall @ Grid (6-12B/A), at Energy Center 2, as highlight
Installation of EMT Conduit (Dia. 3/4) and Box for Fire Alarm (Smoke Detector, Speaker, Remote In
Coordinates & Levels of Blinding under Foundation of Cabin Room, ETFE Pump Room, Water feature P
Coordinates & Levels for Columns of Boundary Wall @ Grid (17-22/M), at Energy Center 2, as highligh
Coordinates & Levels for Footings of Boundary Wall @ Grid (6-12B/A), at Energy Center 2, as highligh
Excavation and Blinding Levels for Low Current Handholes of (MH/PG/LC/ 02,04,05,06,07,08,17) & Fi
Application of Cementitious Water proofing (1st coat ) for Boundary Wall (Inner & outer face) ,Span
Concrete Pouring for Blinding Under Footing and Grade Beam at Grid 1 to 6 / C to J , Inside Energy Ce
Inspection & Compaction tests of 5th Layer (Sub-Grade) Backfilling (Out of 8 layers of Sub-Grade) in B
Inspection & Compaction tests of 6th Layer Backfilling (Sub-Grade) along the Footing (Outer Side), at
Grouting for Stone Cladding of Column C71 (All Sides), As per Attached Highlighted Drawing's.
Level and Location for mass concrete (2nd layer) for Central Bridge foundation Zone 4 grid 1M (as hig
Installation of PVC Conduit (Dia. 75mm) and Junction Box for LC System at the New Ticket Booth No. (
Installation of PVC Conduit (Dia. 25mm) and Box for Voice and Data System (DATA, CAM & Telephone)
Installation of PVC Conduit (Dia. 25mm) and Box for Security System (CAM, Door Controller, Magnetic
Installation of PVC Conduit (Dia. 25mm) and Box for Fire Alarm System (Break Glass) at the New Ticke
Application of 1st Coat cementitious water proofing at Boundary wall (Outer face) @ Maze Garden, A
Aluminium flashing and Sealant on water proofing for Foundation of Boundary wall (Outer Face) @ Gri
Excavation and Blinding Levels for Electrical Handholes of Low Voltage (MH/PG/LV/ 02,04,05,06) &
Coordinates and Top Level Concrete for Slab of Wet Well-F ,Inside Water Garden as highlighted area
Concrete Pouring for Blinding under Electrical Handholes of Low Voltage (MH/WG/LV/1 to 4 & 6 to 8)
Concrete Pouring for Blinding Under Low Current Handholes of Fire Alarm & Security (MH/WG/FA/1 &
Level and Location for RING BEAM Zone 1M (OUTER) Axis 01-1, 01AJ to 01AM (as highlighted)
Level and Location for Diaphragm Wall axis 02AQ (as highlighted) Zone 2N
Level, Location of Central Bridge Abutment Foundation (as highlighted) Zone 4 Grid 02AG - 02AH
Level and Location for 5th layer Mass concrete of Strip Footing Between PC 156 - 158 Zone 2K (as highli
Level and Location for Large Mosque Column for lower first (1st) floor C2C, C2A, C3A, Axis C-6, C1-6, D-6
Surface Preparation and Solvent Base Primer for MCPE 2 inner wall with counter fort at axis 03E to 03I
Steel Reinforcements for Infill wall between Gridline 02AX to 02AY (As highlighted) ZONE 2Q
Steel Reinforcements for RING BEAM Zone 1M (OUTER) Axis 01-1, 01AJ to 01AM (as highlighted), KAI
Steel Reinforcements for MCPE 1 wall (inner) at axis 03S to 03U (As highlighted) 871.00 - 875.85
Shuttering and Scaffoldings for RING BEAM Zone 1M (OUTER) Axis 01-1, 01AJ to 01AM (as highlighted)
Shuttering for Diaphragm Wall axis 02AQ (as highlighted) Zone 2N
Concreting for Infill wall axis ( 01U to 01T ) (As highlighted) ZONE 1G
Shuttering for Central Bridge Abutment Foundation (as highlighted) Zone 4 Grid 02AG - 02AH
Steel Reinforcements for Central Bridge Abutment Foundation (as highlighted) Zone 4 Grid 02AG - 02AH
Two layers of 4mm thivk modified bituminous waterproofing membrane for retaining wall & foundation (
Surface Preparation and Solvent Base primer for retaining wall & foundation (inner) from axis 01G-01K (
Two layers of 4mm thick modified bituminous waterproofing membrane under Central Bridge Abutment
Steel Reinforcements for Infill wall (INNER) axis 02/L to 02/M(as highlighted) Zone 2D (2nd STAGE )
Shuttering of 5th layer Mass concrete of Strip Footing Between PC 156 - 158 Zone 2K (as highlighted)
Steel Reinforcements for Diaphragm Wall axis 02AQ (as highlighted) Zone 2N
Steel Reinforcements for Infill wall between between Gridline 02AQ-02AR (As highlighted) ZONE 2N
Concreting for Large Mosque Column for lower first (1st) floor C2C, C2A, C3A, Axis C-6, C1-6, D-6, D-5.1
Shuttering for Large Mosque Column for lower first (1st) floor C2C, C2A, C3A, Axis C-6, C1-6, D-6, D-5.1 (
Pre-Assembly Bolt Tightening Inspection of Crescent 01, Zone 2 - 1H Axis 01W to 01AA (As per the Hig
Pre-Assembly Bolt Tightening Inspection of Crescent 01, Zone 1 - 1J Axis 01AA to 01AB (As per the Hig
Inspection of Installation, Alignment and Bolt Tightening for the Metal Cladding in Crescent 02 Zone 6
Bolt Tightening Inspection of Crescent 02, Zone 5 - 2G from Axis 02Y to 02V (As per the Highlighted A
Surface Preparation prior to Start backfilling Around MCPE 4 Axis 01AP ZONE 1P (as highlighted)
Level and Location for (vertical) Infill wall between Gridline 02X to 02Y (As highlighted) ZONE 2G
Level and Location for RING BEAM Zone 2F (OUTER) Axis 02-2, 02T to 02U (as highlighted)
Level and Location for South Small Mosque Ground floor Slab On Grade (as highlighted)
Level and Location for Buttress with Beam BII 56, BOI 56 (upto 876.00) & BOI 57 (upto 873.00) Zone 1P (
Shuttering for South Small Mosque Ground floor Slab On Grade (as highlighted)
Surface Preparation and Solvent Base primer under Central Bridge abutment foundation (as highlighted
Shuttering for (vertical) Infill wall between Gridline 02X to 02Y (As highlighted) ZONE 2G
Shuttering and Scaffoldings for RING BEAM Zone 2F (OUTER) Axis 02-2, 02T to 02U (as highlighted)
Concreting for Buttress with Beam BII 56, BOI 56 (upto 876.00) & BOI 57 (upto 873.00) Zone 1P (as highl
Shuttering and Shear Connector for Buttress with Beam BII 56, BOI 56 (upto 876.00) & BOI 57 (upto 873.
Inspection & Compaction tests of 9th Layer (Sub-Grade) Backfilling (Out of 9 layers) for water featu
Stack Boulder Installed 1st Layer at Step 3 (Level +875.85) & 2nd Layer at Step 2, Upto Level +875.85
Slated Layer of 4 mm Thk. Modified Bitomenous Membrane on Water Proofing for Foundation of Bounda
Inspection & Compaction tests of 2nd Layer (Sub-grade) Backfilling (out of 2 layers) for Water Featu
Steel Reinforcement for Slab of Wet Well-F , Inside Water Garden ,as highlighted in the attached dra
Inspection & Compaction tests of 2nd Layer (Sub-grade) Backfilling (out of 2 layers) for Water Featu
Excavation and Bed preparation for water feature lines (HDPE 50mm ) at Entrance of Mist Garden,In
Sand Bedding for water feature lines (HDPE 50mm ) at Entrance of Mist Garden,Inside Water Garden
Steel Reiforcement for Columns at Grid 17 to 22/M , at Energy Center 2, as highlighted area in the a
Concrete Pouring for Blinding Under Footing 28 to 29/M , 28 to 29/R, 4 to 5/L , 1 to 2/J to L , 2 to
Installation of PVC Conduit (Dia. 25mm) & Boxes for Power System (Fused Connection, Socket Outlet,
HDPE Pipe Installation (HDPE dia 250 mm, 1no's) between Wet Well (E) to Geyser Garden, at Water Ga
MOCK UP of FIRST FIX water supply (copper pipes 1/2") with rubber insulation tube as per approved m
Inspection Of Pipe Installation For Non-Potable Water (Irrigation Line ); (200mmØ- UPVC-Claas-5 );
Inspection Of Pipe Installation For Non-Potable Water (Irrigation Line ); (315mmØ- UPVC-Claas-5 );
'Warning Tape Pipe Installation For Non-Potable Water (Irrigation Line ); (110mmØ- UPVC-Claas-5 );
'Warning Tape Installation of Potable Water Pipe for (75mmØ-UPVC-Class-5). As per highlighted Area
'Warning Tape Installation of Potable Water Pipe for (50&75mmØ-UPVC-Class-5). As per highlighted
'Warning Tape Installation of Fire Fighting Networks for (200&160mmØ-UPVC-Class-5). As per highlig
'Warning Tape Installation of Fire Fighting Networks for (160mmØ-UPVC-Class-5). As per highlighted
Concreting for Retaining Wall at Grid 01/M-01/K Zone 1D as highlighted
Level and Location for CHILDCARE Columns upto grade beam at Zone 2N (as highlighted)
Level and Location for Mass Concrete (1st) under Strip Footing Between PC 21-23-25 Zone 1D (as highli
Level and Location for MCPE 2 Inner wall Axis 02AG to 02AF at Zone 2k (as highlighted) 871.00
Level and Location of Excavation for strip footing Between PC 44-46 zone 1G (as highlighted)
"Inspection and compaction test 1st & 2nd layer (Subgrade) for backfilling for MCPE 3 (S.O.G) axis 02 P t
Inspection and compaction test 3RD & 4TH layer (Subgrade) for backfilling for MCPE 3 (S.O.G) axis 02 P t
Inspection and compaction test 3rd layer Backfill for Retaining wall Axis 01AB TO 01AE, 01AG TO 01AI (
Inspection and compaction test 1st layer Backfill for PC and STRIP FOOTING between PC 16-18 Zone 1C (
Concreting for MCPE 2 Inner wall Axis 02AG to 02AF at Zone 2k (as highlighted) 871.00
Shuttering for MCPE 2 Inner wall Axis 02AG to 02AF at Zone 2k (as highlighted) 871.00
Shuttering for CHILDCARE Columns upto grade beam at Zone 2N (as highlighted)
Anti Termite application under Blinding of Strip Footing Between PC 21-23-25 Zone 1D (as highlighted)
Protection layer of 4mm thick bituminous protection board for RC Strip footing between PC 13-15 Zone
Coordinates & Levels of Blinding for Foundation and Grade beam @ Grid (0-6 / A-L), at Energy Center
Excavation and Bed Preparation for Irrigation Sub-main Line Distribution network (Part 3) (50,110 mm
Sand Cover & Pipe Protection for Water Feature Lines (Main 160 dia.HDPE) From Plant Room to Outer
Protection Layer of 4 mm Thk. Bitomenous Protection Board for Foundation of Boundary Wall (Outer Fa
Shuttering of Mass Concrete (1st) under Strip Footing Between PC 21-23-25 Zone 1D (as highlighted)
Inspection & Compaction Tests of 1 st layer Backfilling (Sub-Grade) (Out of 2 Layers) Along Circular
Surface Preparation Prior to Stone Cladding for Walls of Outer seat Wall (Inner & Outer Sides) at Phy
Stone Cladding for Walls of Outer seat Wall (Inner & Outer Sides) at Physic Garden, as highlighted ar
Installation of straight UPVC Conduit (4x110mm) Low Current Ductbank (TELECOM) connected at the L
Steel Reinforcement for Beams of Jetty 1 & Jetty 2 at Boat Garden inside Water Garden , as highlight
Inspection Of Pipe Installation For Non-Potable Water (Irrigation Line ); (110mmØ- UPVC-Claas-5 );
Coordinates and Level for Slab of Wet Well (E), inside Water Garden, as highlighted area in the atta
Inspection of Spatter Dash (Rough Coat) Prior to Plastering of Internal Walls Inside Lobby (GF 5045),
Inspection of Internal Plastering for Walls at Entrance lobby (GF-5068),Entrances of Locker Rooms a
Excavation & Bed Preparation for Irrigation Sub-Main Line Distribution Network (50,90 mm line) at Di
Excavation & Bed Preparation for Electrical Lines of Low Voltage (MH/WG/LV/01 to 03 & 04 to 08), In
Level and Location for Buttress with Beam BOI 54, 55 Zone 1N 1P (as highlighted)
Surface Preparation Prior to start Backfilling at PC and STRIP FOOTING between PC 16-18 Zone 1C (as hi
Concreting for Buttress with Beam BOI 54, 55 Zone 1N 1P (as highlighted)
Shuttering and Shear Connector for Buttress with Beam BOI 54, 55 Zone 1N 1P (as highlighted)
Level and Location for 4th layer Mass concrete of Strip Footing Between PC 156 - 158 Zone 2K (as highli
Shuttering of 4th layer Mass concrete of Strip Footing Between PC 156 - 158 Zone 2K (as highlighted)
Level and Location for Blinding of SOG of South small Mosque Zone 2A (as highlighted) axis A-B, 4-5
Concreting for Blinding of SOG of South small Mosque Zone 2A (as highlighted) axis A-B, 4-5
Shuttering for Blinding of SOG of South small Mosque Zone 2A (as highlighted) axis A-B, 4-5
Anti Termite application under Blinding of SOG of South small Mosque Zone 2A (as highlighted)(mihrab)
Steel Reinforcements for RING BEAM Zone 2F (OUTER) Axis 02-2, 02T to 02U (as highlighted), KAIG3-
Steel Reinforcements for South Small Mosque Ground floor Slab On Grade (as highlighted)
Steel Reinforcements for Large Mosque Column for lower first (1st) floor C2C, C2A, C3A, Axis C-6, C1-6,
Level and Location for Infill wall axis 02/R to 02/Q (as highlighted) Zone 2E (1st stage)
Concreting for Infill wall axis 02/R to 02/Q (as highlighted) Zone 2E (1st stage)
Shuttering for Infill wall axis 02/R to 02/Q (as highlighted) Zone 2E (1st stage)
Surface Preparation (Sand Blasting) for Parapet Wall (from Internal Side) (for All Parapet Walls) on
Protection layer of 4mm thick bituminous protection board for TUNNEL 1 wall (outer) Zone 2H PART C (a
Two layer of 4mm thick modified bituminous waterproofing membrane for TUNNEL 1 wall (outer) Zone 2
Surface Preparation and Solvent Base Primer for TUNNEL 1 wall (outer) Zone 2H PART C (as highlihgted)
Steel Reinforcements for Infill wall between (02/AS & 02/AR) (As highlighted) ZONE 2N
Inspection & Compaction tests of 1st Layer (Sub-grade) Backfilling (out of 2 layers) for Water Featu
Sand Cover & Pipe Protection for Water Feature Lines (Part 6 next level) (HDPE dia 200 mm) at Geyse
Excavation & Bed Preparation for Low Current Lines of Fire Alarm & Security (From MH/WG/FA/01 to 0
Surface Preparation (Sand Blasting) for Stair Core Wall (All Walls From Inside & Outside for This Stai
Installation of PVC Conduit (Dia. 25mm) for Lighting (LED C13) at the South Small Mosque Ground Flo
Installation of PVC Conduit (Dia. 25mm) for Power (Socket Outle) at the South Small Mosque Ground
Inspection & Compaction Tests of 4 th layer Backfilling (Sub-Grade) (Out of 4 Layers) at Level +879.
Installation of PVC Conduit (Dia. 25mm) for Fire Alarm (Microphone) at the South Small Mosque Grou
Final Inspection for the Butterfly Garden From Axis 01 - 21
Bolt Tightening Inspection for the Posts in Aviary Garden from Grid Line 01 to 23 (As per the Highlig
Inspection of Installation & Bolt Tightening for the Wire Mesh Steel Frame in Aviary Garden from Grid
'Pipe Installation of Strom Water pipe OUT FALL-O for (315 mm Ø- UPVC Pipes-Class 4) For Storm Wate
'Bedding of Gravel 3/8" and Geotextile surrounding in pipes (315 mm Ø- UPVC Pipes-Class 4 ) for Stor
Installation of straight UPVC Conduit sleeve (Dia. 3x75mm) Low Voltage Ductbank (Power) at the Butter
Single Layer Water Proofing Membrane 4 mm thk for Foundation of Boundary Wall (Outer Face) @ Grid (
Installation of straight UPVC Conduit (2x110mm) Low Current Ductbank (Fire and Security) connected
Installation of straight UPVC Conduit (2x75mm) Low Current Ductbank (Fire and Security) conne
Installation of straight UPVC Conduit (2x75mm) Low Current Ductbank (TELECOM) connection to L
Installation of straight UPVC Conduit (Dia.25mm) and Box for Fire Alarm (Speaker) at the Maze Garden
"Inspection and Compaction Test for backfilling Sub-grade 4th Layer (4 of 6) around Fire Water Line Pit
Inspection and Compaction Test for backfilling Sub-Grade 4th Layer (4 of 6) around Potable Water Line
"Inspection and Compaction Test for backfilling Sub-grade 4th Layer (4 of 4) for the Duct Bank of MV
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 1) above Gravel for the Duct
Inspection and Compaction test for backfilling Sub-grade 1st Layer ( 1 of 1) above Gravel for Duct Ban
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 1) above Gravel for the Duc
Inspection of Sand bedding under pipe for Fire & Security Distribution Line from C/FS/46 to C/FS/15 at Z
Inspection of Sand bedding under pipe for Telecommunication Line from C/TL/49 to C/TL/18 at Zone-C -
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 7) around Non-Potable water li
Inspection and Compaction Test for backfilling Sub-grade 5th Layer (5 of 6) around Non-Potable water l
Inspection and Compaction Test for Backfilling Sub-grade 3rd Layer (3 of 12) above Gravel around Manh
Inspection and Compaction Test for Backfilling Sub-grade 4th Layer (4 of 5) above Gravel around the
Inspection for Installation of MV Line Junction Pit - C/MV/24, C/MV/41, H/MV/10 - as highlighted
Inspection of Sand Covering to protect the pipe for Non-Potable Water Line at Zone- D - as highlighted
Inspection and Compaction Test for backfilling sub-grade 1st Layer ( 1 of 6) for Foul Water Line betw
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 2) above Sand Covering for Fi
Inspection and Compaction Test for backfilling Sub-grade 2nd Laye (2 of 2) above Sand Covering for Po
Inspection of Sand bedding under pipe for Fire Water Line near Plaza area at Zone-C - as highlighted (Sto
2nd Coat Damp Proofing for Foundation & Kicker of Plant Room (Outer Side) at Maze Garden ,as high
Slated Layer 4mm thk Modified Bituminous Membrane on Water Proofing of Foundation of Plant room (
Aluminium Flashing and Sealant on Water Proofing of Foundation of Plant Room (Outer Side) at Physic
Surface Preparation Prior to Install Riyadh Stone Cladding For Boundary Wall Outer Face @ Span 74 &
Weld Visual & NDT Inspection for the Crescent 01, Zone 2 - 1H Axis (1W,1X,1Y,1Z,1AA) (As per the Hig
Inspection & Compaction tests of 1st Layer (Sub-grade) Backfilling (out of 2 layers) for Water Featu
Stone Cladding for Circular Wall (9th Part) (all Sides),Inside maze Garden ,as highlighted in the atta
Solvent Base Primer Coating for Foundation of Boundary Wall (Outer Face) @ Gride (16-23/Right Side)
Weld Visual & NDT Inspection for the Washer plates Crescent 01, Zone 2 - (1H) & Zone 1 (1J) (As per t
Inspection and compaction test 1st & 2nd layer Backfill for Retaining wall Axis 01AB TO 01AE, 01AG TO
Inspection and compaction test 1st layer Backfill for Retaining wall Axis 01AA TO 01AC, 01AD TO 01AG
1st Coat Damp Proofing for Foundation & Kicker of Plant Room (Outer Side) at Maze Garden ,as highl
Level, Location for MCPE 1 blinding under footing at Zone 2M 2N (as highlighted) axis 03R, 03-2 to 03-1
Level, Location for Excavation for MCPE 1 footing at Zone 2M 2N (as highlighted) axis 03R, 03-2 to 03-2
Level and Location for Promenade Bridge Deck Zone 1E, Axis 01M - 01P (as highlighted)
Concrete Pouring for Footing at gride (M/18 to 22) and ( L/4 to 9) ,as highlighted in the attached dra
Level and Location for Infill wall type (02A) axis ( 01/V to 01/U ) (As highlighted) ZONE 1G
Concreting for Infill wall type (02A) axis ( 01/V to 01/U ) (As highlighted) ZONE 1G
Surface Preparation Prior to Backfilling Surround the Manholes (2 nos) , (MH-D-07-03), and (MH-D-07-
Shuttering for Infill wall type (02A) axis ( 01/V to 01/U ) (As highlighted) ZONE 1G
Steel Reinforcements for (vertical) Infill wall between Gridline 02X to 02Y (As highlighted) ZONE 2G
Concreting for MCPE 1 blinding under footing at Zone 2M 2N (as highlighted) axis 03R, 03-2 to 03-1 (as
Shuttering for MCPE 1 blinding under footing at Zone 2M 2N (as highlighted) axis 03R, 03-2 to 03-1 (as
Anti Termite application under Blinding of MCPE 1 foundation at Zone 2M 2N (as highlighted) axis 03R,
Two layers of 4mm thick modified bituminous waterproofing membrane for MCPE 2 Outer Wall level: 867
Surface Preparation and Solvent Base primer under retaining wall foundation from axis 01C-01B (as high
1st & 2nd layer of 4mm thick modified bituminouswaterproofing membrane under retaining wall founda
Cementitious waterproofing under retaining wall foundation from axis 01C-01B (as highlighted)
Protection layer of 4mm thick bituminous protection board under retaining wall foundation from axis 0
Shuttering & Scaffolding for Promenade Bridge Deck Zone 1E, Axis 01M - 01P (as highlighted)
Level and Location for Infill wall (INNER) axis 02/AC to 02/AB (as highlighted) Zone 2J
Shuttering for Infill wall (INNER) axis 02/AC to 02/AB (as highlighted) Zone 2J
Concreting for Infill wall (INNER) axis 02/AC to 02/AB (as highlighted) Zone 2J
Inspection and Compaction Test for backfilling Sub-grade 1st Laye (1 of 2) above Sand Covering for Pot
Excavation for Potable Water Line near Plaza area at Zone-C including Pit C/PW/04 - as highlighted
Inspection for Installation of Fire Water Line Isolation Pit C/F/05, K/F/07 at Zone - C&K - as highlighted
Inspection for Installation of MV Line Junction Pit - B/MV/01, H/MV/30, L/MV/07, L/MV/09 - as highligh
Inspection of Blinding Concrete under MV Line Pit C/MV/38, C/MV/08, C/MV/25, C/MV/22, C/MV/40, C/
Inspection of Sand bedding under pipe for Fire Water Line at Zone-L - as highlighted (Stock Pile # 132)
Inspection of Sand bedding under pipe for Potable Water Line at Zone-L - as highlighted (Stock Pile # 13
Surface Preparation prior to start backfilling for Foul Water Line between FW-A-12 and FW-A-13 - As Hig
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 2) above Sand Covering for Fi
Inspection and Compaction Test for backfilling Sub-grade 1st Laye (1 of 2) above Sand Covering for Pot
"Surface Prepatio prior to start backfilling around Non-Potable water line Pit - NPW-ISC-04 at Zone G -a
Inspection of Concrete Pouring for Side Walls of MV Line Pulling Pit - C/MV/23, G/MV/19, G/MV/31 at
Inspection of Formwork for Side Walls of MV Line Pulling Pit - C/MV/23, G/MV/19, G/MV/31 at Zone-C&G
Inspection of Blinding Concrete under MV Line Pit B/MV/05, H/MV/10 at Zone-B&H - as highlighted
Inspection of Concrete Pouring for Footing of MV Line Pulling Pit - C/MV/40 at Zone-C (As Highlighted)
Inspection of Formwork for Footing of MV Line Pulling Pit - C/MV/40 at Zone-C (As Highlighted)
Inspection and Compaction Test for Backfilling Sub-grade 2nd Layer (2 of 12) above Gravel around Man
Inspection and Compaction Test for Backfilling Sub-grade 3rd Layer (3 of 5) above Gravel around the
Inspection for Blinding Concrete under Fire & Security Line Pit F/FS/09, G/FS/45 at Zone-F&G - as highli
Inspection for Blinding Concrete under Telecommunication Line Pit F/TL/10, G/TL/01 at Zone-F&G - as h
"Excavation for Storm Water Line from MH-O-01 to MH-O-06 at Zone-2B including Manhole MH-O-01,
Inspection of Concrete Pouring for Footing of MV Line Pulling Pit - C/MV/22, C/MV/25, C/MV/08, C/MV/
Inspection of Formwork for Footing of MV Line Pulling Pit - C/MV/22, C/MV/25, C/MV/08, C/MV/38 at Zo
Inspection of Steel Reinforcement for Footing and Wall of MV Line Pulling Pit - C/MV/22, C/MV/25, C/
Inspection and Compaction Test for backfilling Sub-grade 5th Layer (5 of 9) under Cesspool-3 at Zone-D -
Excavation for Fire & Security Distribution Line from C/FS/46 to C/FS/15 at Zone-C including Pit C/FS/46
Excavation for Telecommunication Line from C/TL/49 to C/TL/18 at Zone-C including pit C/TL/49, C/TL/5
Excavation for Fire & Security Distribution from C/FS/04 to C/FS/21 at Zone-C including Pit C/FS/04, C/
Excavation for Telecommunication Line from C/TL/27 to C/TL/56 at Zone-C including pit C/TL/27, C/TL/5
Installation of Pipe and fittings for Foul Water Drainge Lifting Line as per approved shop drawings (de
'Potable Water Pipes Sand Cover & Pipes Protection (30 cm above Pipes). As per highlighted Area in
Inspection for Installation of MV Line Junction Pit - B/MV/09, G/MV/12 - as highlighted
Inspection of Concrete Pouring for Footing of MV Line Pulling Pit - G/MV/09 G/MV/34, G/MV/35, G/MV
Inspection of Formwork for Footing of MV Line Pulling Pit - G/MV/09 G/MV/34, G/MV/35, G/MV36, G/M
Inspection of Blinding Concrete under MV Line Pit G/MV/33, H/MV/29, H/MV/06, H/MV/04 at Zone-G&H
Inspection and Compaction Test for Backfilling Sub-grade 1st Layer (1 of 12) above Gravel around Manh
Inspection and Compaction Test for backfilling Sub-grade 4th Layer (4 of 6) around Non-Potable water
Inspection and Compaction Test for Backfilling Sub-grade 2nd Layer (2 of 5) above Gravel around the
"Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 6) around Fire Water Line Pit
Inspection and Compaction Test for backfilling Sub-Grade 3rd Layer (3 of 6) around Potable Water Line
"Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 4) for the Duct Bank of MV
Inspection and Compaction Test for backfilling Sub-grade 4th Layer (4 of 5) under Cesspool-3 at Zone-D -
Inspection of Sand bedding under pipe for Potable Water Line near Plaza area at Zone-C - as highlighted
Inspection of Concrete pouring for Wall of MV Line Pulling Pit - F/MV/08, G/MV/28 at Zone-F&G (As High
Inspection of Formwork for Wall of MV Line Pulling Pit - F/MV/08, G/MV/28 at Zone-F&G (As Highlighted
Inspection of Backfilling Gravel 2nd Layer (2 of 2) For Gully G-G-69- AS Highlighted (SP#118)
"Excavation for MV Line Pit - B/MV05 at Zone-B - as highlighted (Red Line - B/MV/05)"
Inspection and Compaction Test for Backfilling Sub-grade 1st Layer (1 of 1) above Gravel for Gully G-G-
"INSPECTION FOR INSTALLATION OF STORM WATER LINE GULLIES G-O-46, G-O-47 - as highlighted "
Inspection for Installation of Potable Water Line Isolation Pit C/PW/02, F/PW/08 at Zone- G&K - as highl
Inspection of Steel Reinforcement for Footing and Wall of MV Line Pulling Pit - C/MV/40 at Zone-C (As H
Inspection of Blinding Concrete under MV Line Pit C/MV/05, C/MV/30 at Zone-C - as highlighted
Inspection of Concrete Pouring for Canopy Column Neck of Seating Area (1) Zone-L (SA-15) - As Highligh
"Inspection of Formwork for Canopy Column Neck of Seating Area (1) Zone-L (SA-15) - As Highlighted"
Excavation for MV Line Pit H/MV/29, H/MV/06, H/MV/04 at Zone-H - as highlighted
Surface Preparation prior to start backfilling Sub-grade around MV Line Pit B/MV/17, B/MV/26, B/MV/
Inspection of backfilling Gravel 1st & 2nd Layer (2 of 2) around Fire Water Line Pit for B/F/17 as highligh
Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 3) above Sand Covering for No
Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 8) under Cesspool-3 at Zone-D -
Inspection and Compaction Test for Backfilling Sub-grade 1st Layer (1 of 5) above Gravel around the
Inspection of Excavation for Heating and Chilled Water Line at Zone-B&G including Pit G/DC/13 - As high
Inspection for Backfilling Gravel 2nd Layer (2 of 2) around Manhole MH-D-03-01 - As Highlighted (Stock
Installation of Anchor Bolts and Check Co-ordinates and Levels for Canopy Foundation for Seating Area-1
"Inspection of Sand Covering Layer for Protection of MV Line from (C/MV/02 to B/MV/26 & B/MV/18 to
Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 6) around Non-Potable water
"Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 6) around Fire Water Line Pit
Inspection of Steel Reinforcement for Footing and Wall of MV Line Pulling Pit - G/MV/08, G/MV/09,
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 2) above Sand Covering for Fi
Inspection and Compaction Test for backfilling Sub-Grade 2nd Layer (2 of 6) around Potable Water Line
"Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 4) for the Duct Bank of MV
Inspection of backfilling Gravel 1st Layer (1 of 1) for the Duct Bank of MV Line from B/MV/08 to C/MV/3
Inspection of backfilling Gravel 1st Layer ( 1 of 1) for Duct Bank of Fire & Security line between B/RC-
Inspection of backfilling Gravel 1st Layer (1 of 1) for the Duct Bank of Telecommunications Line betw
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 3) above Sand Covering for N
Inspection and Compaction Test for Backfilling Sub-grade 3rd Layer (3 of 3) for Storm Water Line besi
Excavation for Fire Water Line near Plaza area at Zone-C including Pit C/F/10 - as highlighted
"Soil Preparation near SBC-06 (Right Side) prior to Casting the concrete around the pipe at Zone-4
Surface Preparation Prior to Backfillig (at bottom of Blinding Level), along Circular Wall (some Parts)
Concrete Pouring for Slab of Wet Well (E),inside Water Garden,as highlighted in the attached drawin
Sand Cover for Water Feature Lines (HDPE),Surround Boat Garden Lake,inside Water Garden,as highli
Concrete Pouring of Building for SOG for GF 5076 inside Management Building, as the attached draw
Inspection of Block Work from Lintel up to final height,at grid (R/1-2), inside Management Buildin
Coordinates and Top level Concrete for footing at grid (L/4 to 9) ,as highlighted in the attached drawi
Coordinates and Top level Concrete for footing at grid (M/18 - 22) ,as highlighted in the attached dr
Final Inspection for the Crescent 02, Zone 2 - 2Q & 2P, from Axis 02AT to 02AZ
Inspection and compaction test 1st layer for backfilling for Childcare Zone2N (as highlighted) (1st of 2
Coordinates and Top level Concrete for columns up to level (872.85) at grid 29 to 30/A to R and 16 to
Level and Location for Buttress with Beam BII 54, 55 Zone 1N 1P (as highlighted)
Level and Location for Infill Wall at Zone 1A TIP Kicker (as highlighted)
Surface Preparartion and Solvent Base Primer for Infill wall between Axis 01T-01U-01V Upto 870.75 (as
Concreting for Buttress with Beam BII 54, 55 Zone 1N 1P (as highlighted)
Shuttering and Shear Connector for Buttress with Beam BII 54, 55 Zone 1N 1P (as highlighted)
Steel Reinforcements for CHILDCARE Columns upto grade beam at Zone 2N (as highlighted)
Two layer of 4mm thick modified bituminous waterproofing membrane for MCPE 3 wall inner Grid (03-1,
Surface preparation & Base primer coating for MCPE 3 wall inner Grid (03/1, 03/A to 02/S ) Zone 2E (a
Shuttering for Infill Wall at Zone 1A TIP Kicker (as highlighted)
Steel Reinforcements for Infill Wall at Zone 1A TIP Kicker (as highlighted)
Installation of straight UPVC Conduit (Dia. 75mm) LV Ductbank connection to Low Voltage Handho
Installation of straight UPVC Conduit (Dia. 75mm) LV Ductbank (Small Power & Normal Lighting
Installation of straight UPVC Conduit (2x75mm) for Low Current Ductbank (Fire & Security from
Installation of straight UPVC Conduit (2x75mm) for Low Current Ductbank (TELECOM from Plant
Installation of straight UPVC Conduit (Dia.25mm) and Box for Security (CAM & Card Reader) at the Phy
Installation of straight UPVC Conduit (Dia.25mm) and Box for Voice and Data (CAM & WIFI) at the Phy
Installation of straight UPVC Conduit (Dia.25mm) and Box for Fire Alarm (Break Glass) at the Physic G
"Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 6) around Fire Water Line Pit
Inspection and Compaction Test for backfilling Sub-Grade 1st Layer (1 of 6) around Potable Water Line
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1of 6) around MV Line Pit C/MV/02
"Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 4) for the Duct Bank of MV
Surface preparation prior to start backfilling Gravel for the Duct Bank of MV Line from B/MV/08 to C/
Surface Preparation prior to start backfill gravel for Duct Bank of Fire & Security line between B/RC-F
"Surface Preparation prior to backfilling Gravel for the Duct Bank of Telecommunications Line betwee
Inspection and Compaction Test for backfilling Sub-grade 5th layer (5 of 10) beside Non-Potable Water L
Excavation for MV Line Pit C/MV/24, C/MV/41 at Zone-C - as highlighted
"Inspection of Sand bedding under pipe for Non-Potable Water Line Branch at Zone F - As highlighted (S
Inspection for Blinding Concrete under Fire & Security Line Pit B/FS/40, B/FS/05, B/FS/41, C/FS/10, C/F
Inspection for Blinding Concrete under Telecommunication Line Pit B/TL/43, B/TL/50, B/TL/18, B/TL/11,
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 3) above Sand Covering for N
Inspection for Backfilling Gravel 1st Layer (1 of 10) around Manhole MH-D-03-01 - As Highlighted (Stock
Inspection and Compaction Test for backfilling Subgrade 1st Layer (1 of 3) above Sand Covering for Non
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 8) under Cesspool-3 at Zone-D
Inspection and Compaction Test for Backfilling Sub-grade 2nd Layer (2 of 3) for Storm Water Line besi
Inspection and Compaction Test for Backfilling Sub-grade 1st Layer (1 of 3) for Storm Water Line besi
'Fire Fighting Networks Sand Cover & Pipes Protection (30 cm above Pipes). As per highlighted Area
"Inspection of Concrete Pouring for MV Line Pulling Pit - B/MV/23 at Zone-B (As Highlighted) "
Level and Location for Infill wall kicker axis 02/AC to 02/AD (as highlighted) Zone 2J
Level and Location for Infill wall (OUTER) axis 02/L to 02/K(as highlighted) Zone 2D
Level and Location for South watch tower Abutment wall at Grid 02/C (as highlighted) (3rd)
Level and Location for Excavation for Strip Footing Between PC 21-23-25 Zone 1D (as highlighted)
Level and Location for MCPE 2 Inner counterfort & wall Axis 02AH to 02AG, 03-2 to 03-1 at Zone 2k (as
Level and Location for Infill wall beside Butress inner 26 between Gridline 01T (As highlighted) ZONE 1G
Surface Preparation prior to Start backfilling at Retaining wall Axis 01AI TO 01AD (as highlighted) ZONE
Inspection and compaction test 3rd and 4th layer at MCPE 1 Axis 02AM, 03-1 to 03-3 (as highlighted) (
"Inspection and compaction test 1st & 2nd layer (Subgrade) for backfilling for Devonian Garden Foul W
Steel Reinforcements for South Watch Tower Wall (internal & external) upto 869.95 (as highlighted) Zo
Shuttering for Infill wall kicker axis 02/AC to 02/AD (as highlighted) Zone 2J
Concreting for Infill wall (OUTER) axis 02/L to 02/K(as highlighted) Zone 2D
Shuttering for Infill wall (OUTER) axis 02/L to 02/K(as highlighted) Zone 2D
Single layer of 4mm thick modified bituminous waterproofing membrane for RC Strip footing between PC
Surface Preparation and Solvent Base Primer for RC Strip footing between PC 1-3-5, 2-4-6-8 Zone 1A (as
Concreting for MCPE 2 Inner counterfort & wall Axis 02AH to 02AG, 03-2 to 03-1 at Zone 2k (as highligh
Shuttering for MCPE 2 Inner counterfort & wall Axis 02AH to 02AG, 03-2 to 03-1 at Zone 2k (as highligh
Concreting for Wall 2 and C2-B for South Small Mosque Ground floor, (as highlighted) Axis B, 4-5, 7 Zon
Shuttering for Wall 2 and C2- B for South Small Mosque Ground floor, (as highlighted) Axis B, 4-5, 7 Zon
Level and Location for SOG at Large Mosque, Axis C-C1, 1-2 (as highlighted)
Concreting for SOG at Large Mosque, Axis C-C1, 1-2 (as highlighted)
Shuttering for SOG at Large Mosque, Axis C-C1, 1-2 (as highlighted)
Steel Reinforcements for SOG at Large Mosque, Axis C-C1, 1-2 (as highlighted)
Concreting for Infill wall beside Butress inner 26 between Gridline 01T (As highlighted) ZONE 1G
Installation of PVC Conduit (Dia. 25mm) for Lighting (EXIT Sign) at the Crescent-02 at the Infill Wal
Installation of straight UPVC Conduit (Dia.25mm) and Box for Fire Alarm (Speaker) at the Maze Garden
HDPE Pipe Installation of Water Features pipes; (160 mmØ SDR11-PE100); As per High lighted Attac
Inspection of Spatter Dash (Rough Coat) Prior to Plastering of Internal Walls at IT CupBoard (GF-5007
Concrete Pouring & Shuttering for Columns of Boundary Wall @ Grid (16-28/R & 29-30/M-R), at Energy
Concrete Pouring for Precast Panel Type-1 (2 no's), Type-2 (2 no) & Typical Infill (1 no's), at Grid (A
Steel Reinforcement for Precast Panel Type-1 (2 no's), Type-2 (2 no) & Typical Infill (1 no's), at Grid
Steel Reinforcement for Footings of Boundary Wall @ Grid (18-22/M), at Energy Center 2, as highlight
Steel Reinforcement for Footings of Boundary Wall @ Grid (L/4-9), at Energy Center 2, as highlighted
Steel Reinforcement for Footings of Seat Walls (08 no's) inside Butterfly Garden, as highlighted area
Sand Cover & Pipe Protection for water feature lines (part 5 Next level) (HDPE dia 50, 110 & 160 m
Sand Cover & Pipe Protection for water feature lines (part 6 next level) (HDPE dia 200 mm) From en
Inspection & Compaction tests of 3rd (Final) Layer Backfilling (Sub-Grade) (Out of 3 layers) @ Grid (2-
Inspection & Compaction tests of 2nd (Final) Layer Backfilling (Sub-Grade) (Out of 2 layers) @ Grid (3
Inspection & Compaction tests of 9th (Final) Layer Backfilling (Sub-Grade)(Out of 9 layers), Upto Bot
Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Grade) (Out of 5 layers) Surround the Pa
Surface preparation prior to water proofing for Foundation of Boundary wall (Outer Face) @ Grid (16-
Primer Coating Prior to Damp proofing on Top of Kicker (Inner & Outer Sides) of Boundary wall Span
Solvent Base Primer Coating prior to Membrane water proofing for Foundation of Boundary wall (Outer
Protection layer of 4mm thick bituminous protection board for Foundation of Plant Room (Outer side),
Aluminium flashing and Sealant on water proofing of Foundation of Plant Room (Inner side), Inside Ph
Slated Layer 4mm thk Modified Bituminous Membrane on Water Proofing of Foundation of Plant Room (
Shuttering for Infill wall beside Butress inner 26 between Gridline 01T (As highlighted) ZONE 1G
Concreting for South watch tower Abutment wall at Grid 02/C (as highlighted) (3rd)
Level and Location for mass concrete (4th layer) under strip footing between PC ( 152-158 )inner Zone 2
Shuttering for mass concrete (4th layer) under strip footing between PC ( 152-158 )inner Zone 2K (as hig
Grouting of Installed Anchor bolt and under Baseplate at Zone 1K INNER & OUTER ring beam (as highl
Concrete Pouring for Blinding under Foundation of Boundary Wall @ Grid (4-12B/A), at Energy Center
Grouting of Installed Anchor bolt and under Baseplate at Zone 1K INNER & OUTER ring beam (as high
Coordinates & Levels of Blinding under Foundation of Boundary Wall @ Grid (4-12B/A), at Energy Cent
Installation and Survey Report for Location and Levels of Anchor Bolts for RING BEAM Zone 1M (INNER)
Level and Location for South small mosque Wall 1-B Axis A, 4-5, (as highlighted)
Level and Location for Buttress BIV 57, BOV BIV 58 Zone 1P (as highlighted)
Level and Location for Strip Footing between PC 132-134 Zone 2F (as highlighted)
Level and Location for RING BEAM Zone 1M (INNER) Axis 01-1, 01AJ to 01AM (as highlighted)
Shuttering and Shear Connector for Buttress BIV 57, BOV BIV 58 Zone 1P (as highlighted)
Concreting for Buttress BIV 57, BOV BIV 58 Zone 1P (as highlighted)
Shuttering for South small mosque Wall 1-B Axis A, 4-5, (as highlighted)
Concreting for South small mosque Wall 1-B Axis A, 4-5, (as highlighted)
Concreting for Strip Footing between PC 132-134 Zone 2F (as highlighted)
Shuttering for Strip Footing between PC 132-134 Zone 2F (as highlighted)
Steel Reinforcements for Strip Footing between PC 132-134 Zone 2F (as highlighted)
Steel Reinforcements for MCPE 1 wall (inner) at axis 03R to 03S (As highlighted) 871.00 - 875.85
Single layer of 4mm thick modified bituminous waterproofing membrane for RC Strip footing between P
Concreting for Diaphragm Wall foundation axis 02/AQ Zone 2N as highlighted
Shuttering and Scaffoldings for RING BEAM Zone 1M (INNER) Axis 01-1, 01AJ to 01AM (as highlighted)
Steel Reinforcements ans Shear Connector for RING BEAM Zone 1M (INNER) Axis 01-1, 01AJ to 01AM (as
Concreting for RING BEAM Zone 1L (OUTER) Axis 01-2, 01AG to 01AJ (as highlighted)
Concreting for RING BEAM Zone 1L (INNER) Axis 01-1, 01AG to 01AJ (as highlighted)
Installation of EMT Conduit (Dia. 3/4) and Box for Voice and Data (Data & Telephone) at Management a
Installation of EMT Conduit (Dia. 3/4) and Box for Fire Alarm (Smoke Detector, Speaker & Remote Indi
Installed 3 ETFE Cushions in Zone 2P as Mock-up for ETFE system between Axis 02AT-02AU.
Plaster Guide Points & Accessories for Plastering of Internal Walls at IT CupBoard (GF-5007) at Grid
Coordinates & Levels for Footing of Boundary Wall at Span 12, at Water Garden, as Highlighted area i
Openning of All Cracks for repair on Parapet wall (from Internal Side)(for all Parapet Walls) on Mana
Concrete Pouring & Shuttering for Footing of Boundary Wall at Span 12, at Water Garden, as Highligh
Steel Reinforcement for Footing & Kicker's of Boundary Wall at Span 12, at Water Garden, as Highligh
Steel Reinforcement for Columns of Boundary Wall @ Grid (M/21-28), at Energy Center 2, as highlight
Steel Reinforcement for Slab of Wet Well (E), Inside Water Garden as highlighted area in attached dra
Concrete Pouring & Shuttering for Footings of Seat Walls (Inner), Inside Physic Garden as highlighted
Inspection & Compaction tests for Existing Fill Material Inside Staircase room (GF-5076) at Grid (7-8
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 2 layers) @ Grid (3-11B/A-
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 3 layers) @ Grid (2-11B/E-L
Concrete Pouring for Thrust Blocks for Water Feature Lines (Part 6) (HDPE 250 mm) from Water pla
Steel Reinforcements for MIHRAB (W2)& (C1,C2-B)& wall(W1-B) south Small MOSQUE zone 2B (as high
3rd (Final) Coat Cementitious Water proofing for Wing Walls & Upstand wall (Inner Side) (Upto 15cm
2nd Coat Cementitious Water proofing for Wing Walls & Upstand wall (Inner Side) (Upto 15cm above F
1st Coat Cementitious Water proofing for Wing Walls & Upstand wall (Inner Side) (Upto 15cm above FG
Installation of straight UPVC Conduit (Dia.25mm) and Box for Fire Alarm (Speaker) at the Physic Garden
Installation of straight UPVC Conduit (Dia.25mm) and Box for Security (Card Reader) at the Maze Gard
Installation of straight UPVC Conduit (Dia.25mm) and Box for Fire Alarm (Speaker) at Crescent-02 Infi
Surface Preparation prior to start backfilling around Fire Water Line Pit for B/F/10, B/F/12, B/F/17, C/F/
Surface Preparation prior to start backfilling around Potable Water Line Pit for C/PW/01, F/PW/11 as hig
Surface Preparation prior to start backfilling gravel around MV Line Pit C/MV/02 at Zone-C (As Highlight
Surface Preparation prior to start backfilling Sub-grade for the Duct Bank of MV Line from C/MV/02 to
Inspection of Waterproofing for the Duct Bank of MV Line from C/MV/02 to C/MV/40 at Zone-C (As High
Inspection of Water Proofing for the Duct Bank of MV Line from B/MV/13 to C/MV/30 at Zone- B&C (As
inspection of Waterproofing for Duct Bank of Fire & Security line from B/fS/26 to B/RC-FS/12, B/RC-F
Inspection of Water proofing for the Duct Bank of Telecommunications Line from B/TL/36 to G/RC-TL/1
Excavation for Potable Water Line at Zone-L including Pit - L/PW/06 - as highlighted
Inspection of Concrete Pouring for Canopy Column Neck of Seating Area (1) at Zone-K (SA-14) - As Highl
"Inspection of Formwork for Canopy Column Neck of Seating Area (1) Zone-K (SA-14) - As Highlighted"
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 8) under Cesspool-3 at Zone-D -
Surface Preparation Prior to Start Backfill Gravel for Manhole MH-D-03-01 - As Highlighted
Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 3) above Sand Covering for No
Inspection for Casting the Blinding Concrete under the Gullies for G-O-47 & G-O-46 (as Highlighted)
Excavation for Non-Potable Water Line Branch including Pit POC-0:NPW at Zone F As highlighted
Inspection of Concrete Pouring for Slab of MV Line Pulling Pit - F/MV/08, G/MV/28 at Zone-F&G (As High
Inspection of Formwork for Slab of MV Line Pulling Pit - F/MV/08, G/MV/28 at Zone-F&G (As Highlighted
Inspection of Steel Reinforcement for Slab of MV Line Pulling Pit - F/MV/08, G/MV/28 at Zone-F&G (As H
"Inspection for Installation of Non-Potable Water Line Isolation Pit NPW-ISC-05, NPW-ISC-07 at Zone- K
Preliminary Inspection of Erected Steel in Crescent 02, Zone 5 2G, from Axis 02V to 02Y
Preliminary Inspection of Erected Steel in Crescent 02, Zone 6 2F from Axis 02S to 02V
Inspection of Installation and Alignment for the Crescent 02, Zone 5 2G, from Axis 02V to 02Y
Installation and Survey Report for Location and Levels of Anchor Bolts for cresent 2 steel roof strucural
Level and Location for Strip Footing between PC 20-22 Zone 1D (as highlighted)
Concreting for Strip Footing between PC 20-22 Zone 1D (as highlighted)
Shuttering for Strip Footing between PC 20-22 Zone 1D (as highlighted)
Steel Reeinforcements for Strip Footing between PC 20-22 Zone 1D (as highlighted)
Steel Reinforcements for Infill wall kicker axis 02/AC to 02/AD (as highlighted) Zone 2J
Steel Reinforcements for Infill wall (INNER) axis 02/AC to 02/AB (as highlighted) Zone 2J
Steel Reinforcements for Infill wall (OUTER) axis 02/L to 02/K(as highlighted) Zone 2D
Concreting for Infill Wall at Zone 2R TIP UPTO 870.15 (as highlighted)
"Excavation for MV Line Pit C/MV/38, C/MV/08, C/MV/25, C/MV/22 at Zone-C - as highlighted "
Installation of Anchor Bolts and Check Co-ordinates and Levels for Canopy Foundation for Seating Area-1
'Warning Tape Installation For Non-Potable Water (Irrigation Line ); (200mmØ- UPVC-Claas-5 ); As p
Concrete Pouring for Blinding under Foundation of Boundary Wall @ Grid (0-4A/A-K), at Energy Center
Coordinates & Levels of Blinding under Foundation of Boundary Wall @ Grid (0-4A/A-K), at Energy Cent
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 5 layers) Surround the Pa
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 5 layers) for Water Featur
Excavation & Soil Preparation for Foundation of Boundary Wall & inside @ Grid (0-4A/A-K), at Energy
Steel Reinforcement & Shuttering for Lintels of Doors & Block work & Stiffner Column's for (Remaining)
Coordinates & Levels of Blinding under Foundation of Boundary Wall @ Grid (0-4A/J-L & 4-8/L), at Ene
Primer Coating Prior to Damp Proofing for Foundation of Plant Room (Outer sides) at Maze Garden, at
Concrete Pouring for Blinding under Foundation of Boundary Wall @ Grid (0-4A/J-L & 4-8/L), at Energy
Steel Reinforcement for Columns of Boundary Wall @ Grid (R/16-22), at Energy Center 2, as highlight
Inspection of Internal Plastering of Walls at Grid (9-10/B-F), at Management Building, as highlighted
Concrete Pouring & Shuttering for Lintels and Stiffener Columns of Block work & Doors for wall at Gr
Steel Reinforcement & Shuttering for Lintels and Stiffener Columns of Block work & Doors for wall at
Inspection and compaction test 1st and 2nd layer at MCPE 1 Axis 02AM, 03-1 to 03-3 (as highlighted) (
Sand Bedding for water feature lines (part 7) (HDPE dia 250 mm, 2 no's) between Water play garden
Excavation & Blinding Levels for Low Current Handholes of Fire Alarm & Security (MH/WG/FA/1 & 2) in
Weld Visual & NDT Inspection for the Crescent 01, Zone 3 - 1F, Axis 01P to 01S
Shuttering for Infill wall inner axis 02/K to 02/L (As highlighted) ZONE 2D (2nd STAGE )
Excavation & Blinding Levels for Electrical Handholes of Low Voltage (MH/WG/LV/1 to 4 & 6 to 8) insi
Concreting for Infill wall inner axis 02/K to 02/L (As highlighted) ZONE 2D (2nd STAGE )
Sand Bedding for Water Feature Lines (Main 160 dia. HDPE) from Plant room to Outer Canopy 3 (Outer
Excavation & Soil Preparation for Foundation of Boundary Wall @ Grid (0-4A/J-R), at Energy Center 2,
Inspection & Compaction tests of 8th Layer Backfilling (Sub-Grade) (Out of 9 layers), for Foundation
Surface Preparation and Paint Touch Up Inspection for the Metal Cladding in Crescent 02, Zone 4 - 2L,
Excavation and Soil preparation for Fountain 3 at Center, Inside Physic Garden as highlighted area in
Pre-Assembly Bolt Tightening Inspection of Crescent 01, Zone 3 - 1G, Axis 01V & 01W
Weld Visual & NDT Inspection for the Baseplate Washer Plates in Crescent 01, Zone 3, 1F & 1G
Concreting for Infill wall inner axis 02/K to 02/J (As highlighted) ZONE 2D (2nd STAGE )
Weld Visual & NDT Inspection for the Crescent 01, Zone 3 - 1G, Axis 01S to 01W
Level and Location for Infill wall inner axis 02/K to 02/J (As highlighted) ZONE 2D (2nd STAGE )
Shuttering for Infill wall inner axis 02/K to 02/J (As highlighted) ZONE 2D (2nd STAGE )
Bolt Tightening Inspection of Crescent 02, Zone 5 2H, from Axis 2AB to 2Y
Inspection of Installation & Bolt Tightening for the Wire Mesh Frame in Aviary Garden from Grid Line
Level and Location for Infill wall inner axis 02/K to 02/L (As highlighted) ZONE 2D (2nd STAGE )
Inspection of Installation, Alignment and Bolt Tightening for the Metal Cladding in Crescent 02 Zone 4
Surface Preparation and Paint Touch Up Inspection in Crescent 02 Zone 4, 2K & 2J from Axis 02AH to
Level and Location for Strip Footing between PC 126-128 Zone 2F (as highlighted)
Inspection of Alignment for the Installed Baseplates in Crescent 01 Zone 1 - 1K Inner
Concreting for Strip Footing between PC 126-128 Zone 2F (as highlighted)
Inspection of Installation and Alignment for the Crescent 02, Zone 5 2H, from Axis 2AB to 2Y
Shuttering for Strip Footing between PC 126-128 Zone 2F (as highlighted)
Surface Preparation and Paint Touch Up Inspection for the Metal Cladding in Crescent 01, Zone 5 - 1B
Steel Reinforcements for Strip Footing between PC 126-128 Zone 2F (as highlighted)
Surface Preparation and Solvent Base Primer for MCPE 2 Outer Wall level: 867.00 to 871.00 (as highligh
Surface Preparartion and Solvent Base Primer for RC Strip footing between PC 13-15 Zone 1C (as highlig
Protection layer of 4mm thick bituminous protection board for TUNNEL 2 Wall shaft (outer) Zone 2F (as
Shuttering for Diaphragm Wall beam axis 02/AR Zone 2N as highlighted
Steel Reinforcements for Diaphragm Wall beam axis 02/AR Zone 2N as highlighted
Level and Location for Diaphragm Wall beam axis 02/AR Zone 2N as highlighted
Concreting for Diaphragm Wall beam axis 02/AR Zone 2N as highlighted
Steel Reinforcements for Infill wall axis 02/R to 02/Q (as highlighted) Zone 2E (1st stage)
Concreting for Infill wall inner axis 02/O to 02/P (As highlighted) ZONE 2E (1st STAGE )
Level and Location for Infill wall inner axis 02/O to 02/P (As highlighted) ZONE 2E (1st STAGE )
Shuttering for Infill wall inner axis 02/O to 02/P (As highlighted) ZONE 2E (1st STAGE )
Steel Reinforcements for walls (W22,W23,W24,W25,W26,W27) at CAFETERIA zone 2A (as highlighted)
Concreting for Strip Footing between PC 92-94 Zone 2A (as highlighted)
Shuttering for Strip Footing between PC 92-94 Zone 2A (as highlighted)
Installation of straight UPVC Conduit (Dia.25mm) and Box for Security (CAMERA) at the Maze Garden -
Steel Reinforcements for Strip Footing between PC 92-94 Zone 2A (as highlighted)
Installation of straight UPVC Conduit (Dia.25mm) and Box for Fire Alarm (Break Glass) at the Maze Gar
Concreting of 3rd layer Mass concrete of Strip Footing Between PC 156 - 158 Zone 2K (as highlighted)
Shuttering of 3rd layer Mass concrete of Strip Footing Between PC 156 - 158 Zone 2K (as highlighted)
Installation of straight UPVC Conduit (Dia.25mm) and Box for Security (CAMERA) at the Crescent-02 Caf
Installation of straight UPVC Conduit (Dia.25mm) and Box for Voice and Data (CAMERA) at the Crescent
Geotextile and Screed under Strip footing between PC 132-134 Zone 2F (as highlighted)
Installation of straight UPVC Conduit (Dia.25mm) and Box for Fire Alarm (Speaker) at the Crescent-02 C
Geotextile and Screed under Strip footing between PC 118-120 Zone 2E (as highlighted)
Level and Location for 3rd layer Mass concrete of Strip Footing Between PC 156 - 158 Zone 2K (as highli
Level and Location for Strip Footing between PC 92-94 Zone 2A (as highlighted)
Level and Location for Infill Wall at Zone 2C between Between Gridline 02I - 02J (as highlighted)
Weld Visual & NDT Inspection for the Crescent 02, Zone 6 - 2E Axis 02N & 02O as per attached highli
' Pipe Installation of Foul Water Line for (110mmØ - UPVC- Class 4) from (FW-A-3-12)&(FW-A-3-14).
'Bedding of Gravel 3/8" and Geotextile Surrounding Foul Water Line for (110mmØ - UPVC- Class 4)
Pipe sleeve installation for strip footing Mechanical; (160mmØupvc class 4) From axis (02&AE) to (02
Inspection and compaction test 1st layer for backfilling at TIP Zone 1A(as highlighted) (1st of 7th layer
Surface Preparation prior to Start backfilling at MCPE 1 Axis 02AM, 03-1 to 03-3 (as highlighted)
Inspection and Compaction Test for backfilling sub-grade 8th Layer (8 of 10) around Fire Water Line Pit
Protection layer of 4mm thick bituminous protection board for MCPE 1 8 isolated foundation & column
Inspection and Compaction Test for backfilling Sub-grade 8th Layer (8 of 10) around Potable Water Line
Concreting for Buttress BOV BIV 56, BOV 57 Zone 1P (as highlighted)
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 2) above Sand Covering for N
Level and Location for Buttress BOV BIV 56, BOV 57 Zone 1P (as highlighted)
Surface Preparation prior to start backfilling Sub-grade under Cesspool-3 at Zone-D - as highlighted
Shuttering and Shear Connector for Buttress BOV BIV 56, BOV 57 Zone 1P (as highlighted)
Inspection of Sand Covering to protect the pipe for Non-Potable Water Line Branch at Zone- G - as high
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 1) above Sand Covering to pro
Level and Location for Retaining Wall blinding axis (01/C to 01/B) Zone 6 as highlighted
Surface Preparation prior to start Waterproofing for the Duct Bank of MV Line from C/MV/02 to C/MV/4
Shuttering for Retaining Wall blinding axis (01/C to 01/B) Zone 6 as highlighted
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 6) around Non-Potable water
Concreting for Infill wall inner axis 01/S (As highlighted) ZONE 1G
Inspection of Concrete Pouring for Footing of MV Line Pulling Pit - G/MV/21 at Zone-G (As Highlighted)
Shuttering for Infill wall inner axis 01/S (As highlighted) ZONE 1G
"Inspection of Formwork for Footing of MV Line Pulling Pit - G/MV/21 at Zone-G (As Highlighted) "
Inspection of Steel Reinforcement for Footing and Wall of MV Line Pulling Pit - G/MV/21 at Zone-G (As H
Level and Location for Infill wall inner axis 01/S (As highlighted) ZONE 1G
Inspection for Installation of Potable Water Line Isolation Pit G/PW/04, K/PW/04 at Zone- G&K - as highl
Level and Location for MCPE 2 Inner wall Axis 03K to 02AD at Zone 2J (as highlighted) 871.00
Level, Location for Excavation for MCPE 1 footing at Zone 2M 2N (as highlighted) axis 03-2 to 02-2 (as hi
Level, Location for MCPE 1 Foundation at Zone 2M 2N (as highlighted) axis 03-2 to 02-2 (as highlighted)
Shuttering for MCPE 2 Inner wall Axis 03K to 02AD at Zone 2J (as highlighted) 871.00
Concreting for MCPE 2 Inner wall Axis 03K to 02AD at Zone 2J (as highlighted) 871.00
Anti Termite application under Blinding of MCPE 1 foundation at Zone 2M 2N (as highlighted) axis 03-2
Shuttering for MCPE 1 blinding under footing at Zone 2M 2N (as highlighted) axis 03-2 to 02-2 (as highli
Concreting for MCPE 1 blinding under foundation at Zone 2M 2N (as highlighted) axis 03-2 to 02-2 (as hi
Shuttering for Infill Wall at Zone 2C between Between Gridline 02-2/I - 02-2/J (as highlighted)
Concrete Pouring for Blinding under Footings of Pargola (6 no's), at Grid (G & P/3, 4 & 5), at Mana
3rd (Final) Coat Cementitious Water proofing for Wing Walls (Inner Side) (Upto 15cm above FGL) of SB
2nd Coat Cementitious Water proofing for Wing Walls (Inner Side) (Upto 15cm above FGL) of SBC-08, a
1st Coat Cementitious Water proofing for Wing Walls (Inner Side) (Upto 15cm above FGL) of SBC-08, a
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 5 layers) Surround the Pa
Inspection & Compaction tests of 7th Layer Backfilling (Sub-Grade) (Out of 9 layers), for Foundation
Inspection & Compaction tests of 6th (Final) Layer Backfilling (Sub-Grade) (Out of 6 layers) for Found
Concrete Pouring & Shuttering for Footings of Boundary Wall @ Grid (L/8-14), at Energy Center 2, as
Surface Preparation Prior to Water proofing for Footing & Kicker (upto 15 cm Above F.F.L) (Inner & O
Installation of straight UPVC Conduit (2x75mm) Low Current Ductbank (Fire and Security) conne
Installation of straight UPVC Conduit (2x75mm) Low Current Ductbank (TELECOM) connection to L
Installation of straight UPVC Conduit (Dia. 75mm) LV Ductbank connection to Low Voltage Handho
Inspection and Compaction Test for backfilling Sub-grade 4th layer (4 of 10) beside Non-Potable Water L
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 2) above Sand Covering for No
Inspection of Concrete Pouring for Footing of MV Line Pulling Pit - C/MV/23, G/MV/02 G/MV/03, G
Inspection of Formwork for Footing of MV Line Pulling Pit - C/MV/23, G/MV/02 G/MV/03, G/MV/19,
Inspection of Steel Reinforcement for Footing and Wall of MV Line Pulling Pit - G/MV/02 at Zone-B&G (A
"Inspection of Sand bedding under pipe for Non-Potable Water Line at Zone B - As highlighted (Stock Pi
"Inspection of Sand bedding under pipe for Non-Potable Water Line at Zone B - As highlighted (Stock Pi
Inspection of Concrete Pouring for Slab of MV Line Pulling Pit - B/MV/23, G/MV/21 at Zone-B&G (As High
Inspection of Formwork for Slab of MV Line Pulling Pit - B/MV/23, G/MV/21 at Zone-B&G (As Highlighted
Inspection of Steel Reinforcement for Slab of MV Line Pulling Pit - B/MV/23, G/MV/21 at Zone-B&G (As
Inspection of Sand Covering to protect the pipe for Non-Potable Water Line at Zone- G - as highlighted
Inspection of Sand Covering to protect the pipe for Non-Potable Water Line at Zone- D - as highlighted
Inspection for Blinding Concrete under Fire Water Line Pit for C/F/05, K/F/07 at Zone-C&K - as highlight
Inspection for Blinding Concrete under Potable Water Line Pit C/PW/02 - as highlighted
Excavation for MV Line Pit G/MV/33 at Zone-G - as highlighted
Inspection and Compaction Test for backfilling sub-grade 7th Layer (7 of 8) around Fire Water Line Pit f
Inspection and Compaction Test for backfilling Sub-grade 7th Layer (7 of 8) around Potable Water Line
Inspection of Concrete Pouring for Footing of MV Line Pulling Pit - B/MV/23 at Zone-B (As Highlighted)
Inspection of Formwork for Footing of MV Line Pulling Pit - B/MV/23 at Zone-B (As Highlighted)
Inspection of Steel Reinforcement for Footing and wall of MV Line Pulling Pit - B/MV/23 at Zone-B (As Hi
Pipe Sleeve Installation of inner infill Wall Mechanical (Fire) From Axis (02/R to 02/Q) At Crescent
HDPE Pipe Installation of Water Features pipes; (110&50mm SDR11-PE100); As per High lighted Att
'Warning Tape Installation For Non-Potable Water (Irrigation Line ); (200mmØ- UPVC-Claas-5 ); As p
'Warning Tape Installation For Non-Potable Water (Irrigation Line ); (200mmØ- UPVC-Claas-5 ); As p
'Warning Tape Installation For Non-Potable Water (Irrigation Line ); (200mmØ- UPVC-Claas-5 ); As p
Concreting for RING BEAM Zone 1K (INNER) Axis 01-1, 01AD to 01AG (as highlighted)
Concreting for abutment wall of Bridge South watch tower grid 02/C Zone 7 (as highlighted)
Concreting for South watch tower Abutment wall kicker at Grid 02/C (as highlighted)
Concreting for Infill wall between (02/L & 02/M) (1st) (As highlighted) ZONE 2D
Single layer of 4mm thick modified bituminous water proofing membrane under Strip footing between P
Protection layer of Geotex and 30mm Screed under Strip footing between PC 92-94 Zone 2A (as highligh
Surface preparation & Cementitious under foundation waterproofing for central bridge abutment axis
Coordinates & Levels for Footings of Boundary Wall @ Grid (L/8-14), at Energy Center 2, as highlighte
Shuttering for mass concrete (3rd layer) for Central Bridge Zone 4 grid 01/2 to 01/M (as highlighted)
Concrete Pouring & Shuttering for Walls of Wet Well F, (upto +872.00), Inside Water Garden as highli
Concreting for mass concrete (3rd layer) for Central Bridge Zone 4 grid 01/2 to 01/M (as highlighted)
Level and Location for mass concrete (3rd layer) for Central Bridge Zone 4 grid 01/2 to 01/M (as highlig
Single layer 4mm thick modified bituminous waterproofing membrane for Foundation of Plant Room (Ou
Excavation for retaining wall from axis 01/B to 01/C Zone 6 (as highlighted)
Surface Preparation Prior to start Backfilling for MCPE 3 (S.O.G) axis 02/P to 02/S Zone 2E 2F (as highlig
Steel Reinforcement for Precast Panel Type-1 (3 no's) & Type-2 (1 no), at Grid (A/17, 18, 19 and Betw
Steel Reinforcement for Footings of Boundary Wall @ Grid (L/8-14), at Energy Center 2, as highlighted
Sand Bedding (above 5 layers Sub-Grade) for water feature lines (part 7) (HDPE dia 110 & 50 mm) b
Excavation & Soil Preparation for Open Channel (Part 3) of Wadi # 3, (Near to SBC 8) Inside Water Ga
Excavation & Bed preparation for Water Feature Lines (Main 160 dia. HDPE) from Plant room to Outer
Inspection & Compaction tests of 4th (Final) Layer (Sub-Grade) Backfilling (Out of 4 layers) for Wate
Excavation & Soil preparation for Plant Encloser room at Discovery Garden at highlighted area in att
Grouting for Stone Cladding of Boundary wall (Outer Side) at Span 31, 32, 33 & 34, As per Attached H
Grouting for Stone Cladding of Boundary wall (Outer Side) at Span 27, 28, 29 & 30, As per Attached H
Inspection of Steel Reinforcement for Footing and Wall of MV Line Pulling Pit - C/MV/23, G/MV/03
"Inspection and Compaction Test for backfilling Sub-base 1st Layer (1 of 1) around Concrete Encase
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 6) around Non-Potable water
"Excavation for Non-Potable Water Line at Zone B including Pit NPW-ISC-14, POC-09 - As highlighted "
Inspection of Sand Covering to protect the pipe for Non-Potable Water Line at Zone- D - as highlighted
Inspection for Blinding Concrete under MV Line Pit B/MV/01, G/MV/20, L/MV/07, L/MV/09 - as highlig
Inspection for Installation of MV Line Junction Pit - B/MV/04, C/MV/18, C/MV/19, H/MV/32 - as highligh
Inspection of Thrust Block for UPVC Pipe (200 & 160 mm Dia) for Fire Water Line at Zone- L - As Highl
"Inspection of Thrust Block for Potable Water Line ( Dia 80mm) at Zone-L - As Highlighted (SCR-KAIG3
Inspection of Concrete Pouring for Footing of MV Line Pulling Pit - F/MV/08, G/MV/28 at Zone-F&G (As H
Inspection of Formwork for Footing of MV Line Pulling Pit - F/MV/08, G/MV/28 at Zone-F&G (As Highligh
Inspection of Steel Reinforcement for Footing and Wall of MV Line Pulling Pit - F/MV/08, G/MV/28 at Z
Level and Location for Tunnel 1 (part C) Suspended Slab and Strip footing between PC 144-146 Zone 2H (
Shuttering for Tunnel 1 (part C) Suspended Slab and Strip footing between PC 144-146 Zone 2H (as highl
Concreting for Tunnel 1 (part C) Suspended Slab and Strip footing between PC 144-146 Zone 2H (as highl
Steel Reinforcements for Tunnel 1 (part C) Suspended Slab and Strip footing between PC 144-146 Zone 2
Single layer of 4mm thick modified bituminous waterproofing membrane under Strip footing between P
Surface Preparartion and Solvent Base Primer under Strip footing between PC 118-120 Zone 2E (as highl
Surface Preparation and Solvent Base Primer under Strip footing between PC 132-134 Zone 2F (as highli
Single layer of 4mm thick modified bituminous waterproofing membrane under Strip footing between P
Protection layer of 4mm thick modified bituminous protection board under Strip footing between PC 12
Single layer of 4mm thick modified bituminous waterproofing membrane under Strip footing between P
Surface Preparation and Solvent Base Primer for RC Strip footing between PC 97-99 Zone 2B (as highligh
Surface Preparation and Solvent Base Primer under Strip footing between PC 92-94 Zone 2A (as highligh
Level and Location for Infill Wall at Zone 2R TIP UPTO 870.15 (as highlighted)
Pre-Assembly Bolt Tightening Inspection of Crescent 01, Zone 3 - 1F, Axis 01P to 01R
Solvent base primer coating for Pile Cap at Zone 2N (PC 175 to 182)
Inspection and compaction test 1st layer for Childcare Zone 2N (as highlighted) axis 02AT-02AR (1st of
Inspection and compaction test 2nd layer for backfilling of PC and Stripfooting PC 7-9-11 Zone 1B (as hi
Concreting of 2 side Wall for Tunnel 1 (as Highlighted) Zone 2H
Shear Connector impalt installation for BII BIV 67 (1st) Zone 2C
Shear Connector for Buttress BOI-BOV 64 zone 2B
Single layer of 4mm thick modified bituminous waterproofing membrane for RC Strip Footing between P
Protection layer of 4mm thick bituminous protection board for MCPE 1 Wall (as highlighted) Zone 2N 2M
Steel Reinforcements for Infill Wall at Zone 2R TIP UPTO 870.15 (as highlighted)
Shuttering for Infill Wall at Zone 2R TIP UPTO 870.15 (as highlighted)
Inspection Of Pipe Installation For Non-Potable Water (Irrigation Line ); (200mmØ- UPVC-Claas-5 );
Installation of Main Potable Water Pipes (75mmØ-UPVC-Class-5) at Zone L- From Pit - L/PW/04 to Poi
Installation of Main Fire Water Pipes (200&160mmØ-UPVC-Class-5) From Pit (L/F/06) to Next to Pit
HDPE Pipe Installation of Water Features Drainage pipes; (dia200mm SDR11-PE100); As per High lig
HDPE Pipe Installation of Water Features pipes; (dia200&160mm SDR11-PE100); As per High lighted
Installation of straight UPVC Conduit sleeve (1x75mm) for Low Current Ductbank (Fire & Security) at
Installation of straight UPVC Conduit sleeve (3x75mm) for Low Current Ductbank (BMS & ICT) at the C
Installation of straight UPVC Conduit (Dia.25mm) and Box for Fire Alarm (Speaker) at the Crescent-02 C
Installation of straight UPVC Conduit (2x75mm) for Low Current Ductbank (Fire & Security from
Installation of straight UPVC Conduit (2x75mm) for Low Current Ductbank (TELECOM from Plant
Installation of straight UPVC Conduit (Dia. 75mm) LV Ductbank (Small Power & Normal Lighting
Installation of straight PVC Conduit (Dia.25mm) and Box for Voice and Data (WIFI) at Infill Wall be
Installation of straight UPVC Conduit (Dia. 110mm) for Telecom (Telecom Ducts) South Watch Tower a
Installation of straight UPVC Conduit (Dia. 110mm) for Fire Security (Fire Alarm Cables) South Watch
Excavation for Devonian Garden zone 2M (as highlighted)
Steel Reinforcements for walls (W28,W29,W30,W31,W32) at CAFETERIA zone 2A (as highlighted)
Concreting for walls(W13 ,W9,W8) at CAFETERIA zone 2A (as highlighted)
Inspection & Compaction tests of 2nd (Final) Layer Backfilling (Sub-Grade) (Out of 2 layers) for Sub
Concreting for walls (W12, W11) at CAFETERIA zone 2A (as highlighted)
Inspection & Compaction tests of 5th (Final) Layer Backfilling (Sub-Grade) (Out of 5 layers) for wat
Inspection & Compaction tests of 5th Layer Backfilling (Sub-Grade) (Out of 6 layers) for Foundation o
Inspection & Compaction tests of 6th Layer Backfilling (Sub-Grade) (Out of 9 layers), for Foundation
Inspection & Compaction tests of 6th Layer Backfilling (Sub-Grade) (Out of 7 layers) inside the Bounda
Surface Preparation and Solvent Base Primer for TUNNEL 2 Wall shaft (outer) Zone 2F (as highlihgted)
Steel Reinforcement for Columns of Boundary Wall @ Grid (21-28/R & 29-30/M-R), at Energy Center 2,
Two Layers of 4mm thick modified bituminous waterproofing membrane for TUNNEL 2 Wall shaft (outer)
Coordinates & Levels for Walls of Wet Well F, (upto +872.00), Inside Water Garden as highlighted are
Installation of straight PVC Conduit (Dia.25mm) and Box for Fire Alarm (Speaker & Flashing Beacon) a
Installation of straight PVC Conduit (Dia.25mm) and Box for Fire Alarm (Speaker) at Buttress Axis (01
Installation of straight PVC Conduit (Dia.25mm) and Box for Security System (CAM) at Buttress Axis
Installation of straight PVC Conduit (Dia.25mm) and Box for Voice and Data (CAM) at Buttress Axis (
'Fire Fighting Networks Sand Cover & Pipes Protection (30 cm above Pipes). As per highlighted Area
'Potable Water Pipes Sand Cover & Pipes Protection (30 cm above Pipes). As per highlighted Area in
Installation of earthing clamps with conductor 70mm (1pc.) for earthing reinforcement steel re-bar at
Installation of earthing clamps with conductor 70mm (1pc.) for earthing reinforcement steel re-bar at
Installation of earthing clamps with conductor 70mm (1pc.) for earthing reinforcement steel re-bar at
Installation of earthing clamps with conductor 70mm (1pc.) for earthing reinforcement steel re-bar at
Installation of straight UPVC Conduit (Dia.32mm) and Box for Lighting (F1) at Crescent-01 Buttress Axi
Installation of straight UPVC Conduit (Dia. 75mm) Low Voltage Ductbank (Power & Normal Lighting)
Installation of straight UPVC Conduit (Dia. 75mm) Low Voltage Ductbank (Power & Normal Lighti
Excavation for Fire & Security Distribution at Zone-B,F&G including Pit B/FS/02, B/FS/04, F/FS/09, G/F
Excavation for Telecommunication Line at Zone-B,F&G including pit B/TL/34, B/TL/30, F/TL/10, G/TL/01
Excavation for Non-Potable Water Line at Zone B - As highlighted
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 2) above Green Tiles for Tele
Inspection and compaction Test for backfilling Sub-grade 1st Layer (1 of 2) above GreenTiles for Fire &
"Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 1) above Red Tiles for MV L
Inspection and Compaction Test for backfilling Sub-grade 3rd layer (3 of 10) beside Non-Potable Water L
Inspection and Compaction Test for backfilling Sub-grade 3rd layer (3 of 5) beside Non-Potable Water Li
Inspection of Sand bedding under pipe for Non-Potable Water Line at Zone G - As highlighted (Stock Pile
Inspection for Installation of MV Line Junction Pit - C/MV/21, C/MV/31 - as highlighted
"Excavation for Non-Potable Water Line Pit at Zone G - NPW-ISC-16 - As highlighted "
Inspection for Blinding Concrete under MV Line Pit B/MV/04, C/MV/18, C/MV/19, C/MV/31, C/MV/21 -
Inspection and compaction test 5th layer Backfill for MCPE 3 Inner wall Axis 03A to 02S (as highlighted)
Steel Reinforcements for Infill wall between BII BIV 77-78 between Gridline 02O-02P (As highlighted) ZO
Level and Location for RING BEAM Zone 1L (INNER) Axis 01-1, 01AG to 01AJ (as highlighted)
Shuttering ans Scaffoldings for RING BEAM Zone 1L (INNER) Axis 01-1, 01AG to 01AJ (as highlighted)-00
Steel Reinforcements and Shear Connector for RING BEAM Zone 1L (INNER) Axis 01-1, 01AG to 01AJ (a
Level and Location for MCPE 2 Wall (inner) Axis 02C-03K Zone 2J As highlighted 871.00
Concreting for MCPE 2 Wall (inner) Axis 02C-03K Zone 2J As highlighted 871.00
Shuttering for MCPE 2 Wall (inner) Axis 02C-03K Zone 2J As highlighted 871.00
Steel Reinforcements for Infill wall between BI 72-74 Gridline 02k - 2l (as highlighted) Zone 2C (2nd stag
Steel Reinforcements for Infill wall between BI 70-72 Gridline 02J - 2K (as highlighted) Zone 2C (2nd stag
Level and Location of excavation for Piping of Site Foul water at zone 2M (as highlighted)
Sand Cover & Pipe Protection for Water Feature Lines (Main 110 dia & Sub 63mm 4 no's) from Plant ro
Mockup for Stone Cladding on Boundary wall of Aviary Garden, Installed Location at Entrance Right S
Installation and Survey Report for Location and Levels of Anchor Bolts for RING BEAM Zone 1L (OUTER)
Aluminium flashing and Sealant on water proofing of Columns & Walls Sides at Grid (B/1-21) & (1&21/A
Inspection of Installation, Alignment, Bolt Tightening & Paint Touch Up for the Metal Cladding in Cre
Pre-Assembly Bolt Tightening Inspection of Crescent 01, Zone 3 - 1F, Axis 01S
Pre-Assembly Bolt Tightening Inspection of Crescent 01, Zone 3 - 1G, Axis 01S to 01U
Inspection of Plastering (Final Coat) for External Elevations (Remaining Parts) at Site Tower 2, as per
Single layer of 4mm thick modified bituminous waterproofing membrane for Strip Footing between PC
Slated Layer 4mm thk Modified Bituminous Membrane on Water Proofing on Columns & Walls Sides at G
Steel Reinforcement for Walls of Wet Well F, (upto +872.50), Inside Water Garden as highlighted area
Concrete Pouring & Shuttering for Slab of New Ticketing Booth # 2A As per Attached Highlighted Draw
Concrete Pouring & Shuttering for Footings of Seat Walls (Inner), Inside Physic Garden as highlighted
Geo Textile on Blinding (Both sides 500mm wide) under boundary wall at Span 12, at Water Garden, as
Protection layer of 4mm thick bituminous protection board (Both sides 500mm wide) on Blinding unde
Single layer 4mm thick modified bituminous waterproofing membrane (Both sides 500mm wide) on Blin
Concrete Pouring & Shuttering for Footings of Boundary Wall @ Grid (21-28/M & 16-22/R), at Energy C
Check Top of Slab Levels (+2950) for New Ticketing Booth # 2A As per Attached Highlighted Drawing's
Coordinates & Levels for Footings of Boundary Wall @ Grid (21-28/M & 16-22/R), at Energy Center 2,
"Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 3) around Concrete Encas
Excavation for Fire & Security Distribution Line from B/FS/21 to C/FS/46 & C/FS/47 to C/FS/15 and B/F
Excavation for Telecommunication Line from B/TL/42 to C/TL/49 & C/TL/51 to C/TL/18 including pit B/T
"Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 3) around Concrete Encas
"INSPECTION FOR INSTALLATION OF ALL RINGS (RISER) AND SLAB FOR FW-A-6 (As Highlighted) "
INSPECTION FOR MANHOLE BASE INSTALLATION AND UPVC PIPE CONNECTION FOR - FW-A-6 (As Highligh
Surface Preparation prior to start Water Proofing for the Duct Bank of MV Line from B/MV/13 to C/MV/
Surface Preparation prior to strart waterproofing for Duct Bank of Fire & Security line from B/fS/26
Surface Preparation prior to start water proofing for the Duct Bank of Telecommunications Line from
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 6) around Non-Potable water
Inspection for Laying of Red Tiles above the pipe for MV Line from B/MV/17 to C/MV/02 at Zone-B&C as
Inspection and Compaction Test for backfilling Sub-grade 2nd layer (2 of 10) beside Non-Potable Water L
Inspection of Sand bedding under pipe for Fire Water Line near Plaza area at Zone-C - as highlighted (St
Inspection of Sand bedding under pipe for Potable Water Line near Plaza area at Zone-C - as highlighted
Inspection and Compaction Test for backfilling Sub-Grade 1st Layer (1 of 1) above Green Tiles for Tel
Inspection and Compaction Test for backfilling Sub-Grade 1st Layer (1 of 1) above GreenTiles for Fire &
Inspection and Compaction Test for backfilling Sub-grade 2nd layer (2 of 5) beside Non-Potable Water Li
Excavation for MV Line Pit G/MV/20 - as highlighted
Excavation for Non-Potable Water Line at Zone G - As highlighted
Installation of straight UPVC Conduit (Dia.32mm) and Box for Lighting (F1) at Crescent-01 Buttress Axi
Installation of straight UPVC Conduit (Dia.32mm) and Box for Lighting (F1) at Crescent-01 Buttress Axi
Completion of Stacked Boulders with Grouting for All Layers Surround Mist Garden, inside Water Gard
Completion of Stacked Boulders with Grouting for All Layers at Bottom Right Side of Geyser Garden (P
Completion of Stacked Boulders with Grouting for All Layers Surround Geyser Garden (Right Side 4 Ste
Completion of Stacked Boulders with Grouting for All Layers From Geyser Garden to Mist Garden Left
Inspection of Plastering (Final Coat) for External Wall Elevation at Grid (10-12/Q), at Management Bui
Inspection of Plastering (Final Coat) for Internal Walls inside Passage (GF 5000 D), Store (GF 5028 B
Inspection of Spatter Dash (Rough Coat) Prior to Plastering of Internal Walls at Grid (9-10/B-F), at M
Inspection of Spatter Dash (Rough Coat) Prior to Plastering of Internal Walls at Entrance Lobby (GF
Plaster Guide Points & Accessories for Plastering of Internal Walls at Entrance Lobby (GF-5068), En
Inspection of Spatter Dash (Rough Coat) for External Elevations (Remaining Parts) at Site Tower 2, as
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 4 layers) @ Grid (2-11B/E-L
Inspection & Compaction tests of 4th Layer Backfilling (Sub-Grade) (Out of 5 layers) for Foundation o
Inspection & Compaction tests of 5th Layer Backfilling (Sub-Grade) (Out of 9 layers), for Foundation
Inspection & Compaction tests of 5th Layer Backfilling (Sub-Grade) (Out of 7 layers) inside the Bounda
Concreting for Blinding of SOG of South small Mosque Zone 2A (as highlighted) axis B-G, 1-8
Shuttering for Blinding of SOG of South small Mosque Zone 2A (as highlighted) axis B-G, 1-8
Level and Location for Blinding of SOG of South small Mosque Zone 2A (as highlighted) axis B-G, 1-8
Anti Termite application under Blinding of SOG of South small Mosque Zone 2A (as highlighted)
Surface Preparation and Solvent Base Primer for TUNNEL 2 Slab & Wall shaft (outer) Zone 2F (as highlihg
Two layer of 4mm thick modified bituminous waterproofing membrane for TUNNEL 2 Slab & Wall shaft
Steel Reinforcements for MCPE 2 wall (inner) at axis 02AA to 02AB As highlighted
Concreting for 2nd layer Mass Concrete of Central Bridge Foundation (as highlighted) Zone 4 Grid 1M,
Inspection and compaction test 10th layer for backfilling of MCPE 1 axis 02AN to 02AP (as highlighte
Level and Location for blinding for central bridge abutment axis ( 02/AK) zone 4 (as highlighted)
Shuttering for blinding for central bridge abutment axis ( 02/AK) zone 4 (as highlighted)
Antitermitte for blinding for central bridge abutment axis ( 02/AK) zone 4 (as highlighted)
" Notification prior to start excavation works @ Carboniferous Garden zone 2J 2K (as highlighted) "
Steel Reeinforcements for Buttress (with beam ), BO ( 57 ) zone 1P (as highlighted)
Concreting for mass concrete (3rd layer) under strip footing between PC ( 152-158 )inner Zone 2K (as hi
Level and Location for mass concrete (3rd layer) under strip footing between PC ( 152-158 )inner Zone 2
Shuttering for mass concrete (3rd layer) under strip footing between PC ( 152-158 )inner Zone 2K (as hig
Protection layer of 4mm thick bituminous protection board for RC Strip Footing between PC 150-152 (a
Steel Reinforcements for walls (W16, 17, 18) Undercroft at CAFETERIA zone 2A (as highlighted) 869.10
Installation of PVC Conduit (Dia. 25mm) for Lighting (EXIT Sign) at the Crescent-02 at the Infill Wal
Installation of straight UPVC Conduit Sleeve (Dia. 75mm) LV (Small Power & Normal Lighting) & EM (
Installation of UPVC Conduit Sleevs (Dia. 75mm) Low Current (Fire and Security) from (MH/ZG/FA/1
Installation of UPVC Conduit Sleevs (Dia. 75mm) Low Current (Fiber Optic Cables) from (MH/ZG/T
Shuttering for abutment wall of Bridge South watch tower grid 02/C Zone 7 (as highlighted)
Level and Location for abutment wall of Bridge South watch tower grid 02/C Zone 7 (as highlighted)
Level and Location for Wall 2 and C1 for South Small Mosque Ground floor, (as highlighted) Axis B, 4-5
Shuttering for Wall 2 and C1 for South Small Mosque Ground floor, (as highlighted) Axis B, 4-5 Zone 2B
Concreting for Wall 2 and C1 for South Small Mosque Ground floor, (as highlighted) Axis B, 4-5 Zone 2B
Surface preparation & Base primer coating for Strip Footing between PC 16-18 (as highlighted) Zone 1
Weld Visual & NDT Inspection for the Baseplate Washer Plates in Crescent 02, Zone 4 2J
Weld Visual & NDT Inspection for the Baseplate Washer Plates in Crescent 02, Zone 5 2G & 2H
Weld Visual & NDT Inspection for the Baseplate Washer Plates in Crescent 02, Zone 6 2E & 2F
Inspection and compaction test 8th & 9th layer for backfilling of MCPE 1 axis 02/AN to 02/AP (as highl
Steel Reeinforcements for RC Strip Footing between PC 13-15 Zone 1C (as highlighted)
Level and Location for walls (W12, W11) at CAFETERIA zone 2A (as highlighted)
Shuttering for walls (W12, W11) at CAFETERIA zone 2A (as highlighted)
Steel Reinforcements for walls (W 12) at CAFETERIA zone 2A (as highlighted) , Attachment KAIG3-SCR-
Level and Location for RC Strip Footing between PC 13-15 Zone 1C (as highlighted)
Concreting for RC Strip Footing between PC 13-15 Zone 1C (as highlighted)
Shuttering for RC Strip Footing between PC 13-15 Zone 1C (as highlighted)
Inspection and compaction test 4th layer Backfill for MCPE 3 Inner wall Axis 03A to 02S (as highlighted)
Inspection and Compaction test for backfilling Sub-grade 2nd Layer (2 of 4) above Sand Covering for No
Two Coats of bituminous damp proofing for MCPE 1 8 isolated foundation & columns (870.00) Grid (02
Inspection and Compaction Test for backfilling Sub-grade 1st layer (1 of 10) beside Non-Potable Water L
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 6) around Non-Potable water l
Inspection and Compaction Test for backfilling sub-grade 6th Layer (6 of 7) around Fire Water Line Pit f
Inspection and Compaction Test for backfilling Sub-grade 6th Layer (6 of 7) around Potable Water Line
Excavation for Fire Water Line near Plaza area at Zone-C including Pit C/F/05 - as highlighted
Excavation for Potable Water Line near Plaza area at Zone-C including Pit C/PW/02 - as highlighted
'Hard Riyadh Swan Stone Cladding selection for samples (Color and Surface Texture) as per attached
'Hard Riyadh Swan Stone Cladding selection for samples (Color and Surface Texture) as per attached
Installation of straight UPVC Conduit (Dia.25mm) and Box for Fire Alarm (Break Glass) at Crescent -01
"Installation of straight UPVC Conduit sleeve (50mm) for Voice and Data (WIFI) at the Physic Garden as
"Installation of EMT Conduit (Dia. 3/4 & 1inch.) and Box for Power (Fused Connection Unit & Connecti
Coordinates & Levels of Blinding under Foundation of Seat Walls (08 no's) inside Butterfly Garden, as
Inspection & Compaction tests of 3rd Layer (Sub-Grade) Backfilling (Out of 4 layers) for Water Featu
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 2 layers) for Sub surfac
Installation of stub-up UPVC Conduit (32mm ) for Lighting (B2 & B2/CE) at the Physic Garden as per at
Inspection & Compaction tests of 8th Layer (Sub-Grade) Backfilling (Out of 9 layers) for water featu
Inspection & Compaction tests of 4th Layer Backfilling (Sub-Grade) (Out of 5 layers) for water featu
Installation of straight UPVC Conduit (Dia.32mm) and Box for Lighting (W14) at Crescent-01 Buttress A
Concrete Pouring & Shuttering for Columns C74 & C75 of Boundary wall, As per Attached Highlight
Concrete Pouring & Shuttering for Roof Slab of Plant room at Maze Garden, at highlighted area in att
Installation of straight UPVC Conduit (Dia.32mm) for Power (Socket Outlet) at Crescent-01 Buttress Ax
2nd Coat Cementitious Water Proofing for Blinding under boundary wall at Span 12, at Water Garden,
Installation of straight UPVC Conduit (Dia.32mm) and Box for Lighting (W14) at Crescent-01 Buttress A
1st Coat Cementitious Water Proofing for Blinding under boundary wall at Span 12, at Water Garden,
Solvent Base Primer Coating (Both sides 500mm wide) for Blinding prior to Water proofing under boun
Surface preparation of Blinding prior to Water proofing under boundary wall at Span 12, at Water Gar
Installation of straight UPVC Conduit (Dia.32mm) for Power (Socket Outlet) at Crescent-01 Buttress Ax
Concrete Pouring for Blinding under Foundation of Seat Walls (08 no's) inside Butterfly Garden, as hi
Steel Reinforcement for Footings of Boundary Wall @ Grid (21-28/M & 16-22/R), at Energy Center 2, a
Completion of Stacked Boulders with Grouting for All Layers of Wadi 3 (Part 1), inside Water Garden,
Completion of Stacked Boulders with Grouting for All Layers at Between Boat Garden lake and Boundary
Completion of Stacked Boulders with Grouting for All Layers of Miscellaneous areas Surround Mist &
Completion of Stacked Boulders with Grouting for All Layers Between Mist & Geyser and Right side of
Grouting for Stone Cladding of Boundary wall (Inner Side) at Span 11 & 12 and Column's C11 & C12 (Al
Level and Location for plinding under slab on grade at Large Mosque grid C,1-2, C1,1-2 ZONE 1G (as high
Excavation for strip footing Between PC 44-46 zone 1G (as highlighted)
Level and Location for Infill wall between Gridline 02F- 02E (As highlighted) ZONE 2B
Inspection of Installation and Alignment for the Crescent 02, Zone 6 2E, from Axis 2N to 2R
Bolt Tightening Inspection of Crescent 02, Zone 6 - 2E from Axis 02N to 02R
Concreting for plinding under slab on grade at Large Mosque grid C,1-2, C1,1-2 ZONE 1G (as highlighetd)
Shuttering for plinding under slab on grade at Large Mosque grid C,1-2, C1,1-2 ZONE 1G (as highlighetd)
Antitermitte for plinding under slab on grade at Large Mosque grid C,1-2, C1,1-2 ZONE 1G (as highlighetd
Shuttering for Infill wall between Gridline 02F- 02E (As highlighted) ZONE 2B
Concreting for Infill wall between Gridline 02F- 02E (As highlighted) ZONE 2B
Concreting for walls (W20,W21) undercroft at CAFETERIA zone 2A (as highlighted) 869.10
Surface Preparation prior to Grouting of Installed Anchor bolt PG 430-50-70, PF 430-70-70 under
Steel Reeinforcements for Buttress (with beam ), BO (56 & 58 ) , BI (58) zone 1P (as highlighted)
Inspection and compaction test 3rd layer Backfill for MCPE 3 Inner wall Axis 03A to 02S (as highlighted))
Inspection and compaction test 7th layer for backfilling of MCPE 1 axis 02/AN to 02/AP (as highlighted
Coordinates & Levels of Blinding under Foundation of Boundary Wall @ Grid (M/15-22), at Energy Cent
Inspection & Compaction tests of Final Layer (Sub Base) Backfilling (after 3 layers Sub-Grade) Infront
Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Grade) (Out of 5 layers) for water feat
Inspection & Compaction tests of 7th Layer (Sub-Grade) Backfilling (Out of 9 layers) for water featu
Inspection & Compaction Tests for 2nd Layer Backfilling (Out of 2 layers Sub Grade and Final Layer
Inspection & Compaction Tests for 2nd Layer Backfilling (Out of 2 layers Sub Grade and Final Layer
Inspection & Compaction tests of 4th Layer Backfilling (Sub-Grade) (Out of 5 layers) inside the Bounda
Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Grade) (Out of 5 layers) for Foundation o
Inspection & Compaction tests of 4th Layer Backfilling (Sub-Grade) (Out of 9 layers), for Foundation
Inspection & Compaction tests of 11th (Fianl) Layer Backfilling (Sub-Grade Out of 11 layers), for Fou
Concrete Pouring for Blinding under Foundation of Boundary Wall @ Grid (M/15-22), at Energy Center
Surface Preparation prior to Water Proofing for Foundation of Plant Room (Outer sides) at Maze Garde
Solvent Base Primer Coating prior to Membrane Water Proofing for Foundation of Plant Room (Outer si
Inspection of First Layer Block Layout at Grid (R/1-2), Inside Management Building, As per Highlig
Plaster Guide Points & Accessories for Plastering of Internal Walls at Grid (9-10/B-F), at Management
Inspection of Block Work Upto Lintel height at Grid (R/1-2), Inside Management Building, As per H
Inspection of Concrete Pouring for Canopy Column Neck of Seating Area (1) at Zone-G (SA-10) - As Highl
"Inspection of Formwork for Canopy Column Neck of Seating Area (1) Zone-G (SA-10) - As Highlighted"
Inspection for Laying of Green Tiles above the pipe for Telecommunication Line from B/TL/51 to B/TL/32
Inspection for Laying of GreenTiles above the pipe for Fire & Security Distribution Line from B-FS-44 to
Inspection for Laying of Green Tiles above the pipe for Telecommunication Line from B/TL/12 to B/TL/15
Inspection for Laying of GreenTiles above the pipe for Fire & Security Distribution Line from B-FS-15 to
Inspection and Compaction Test for backfilling sub-grade 1st Layer (1 of 2) above Sand Covering for No
Inspection and Compaction Test for backfilling Sub-grade 1st layer (1 of 5) beside Non-Potable Water Li
Inspection for Installation of Fire Water Line Isolation Pit L/F/08, L/F/09, L/F/10, L/F/11 at Zone - L - as h
Inspection and Compaction Test for backfilling sub-grade 5th Layer (5 of 7) around Fire Water Line Pit f
Inspection and Compaction Test for backfilling Sub-grade 5th Layer (5 of 7) around Potable Water Line
Inspection of Sand bedding under pipe for Non-Potable Water Line at Zone B&C - As highlighted (Stock P
Installation of Anchor Bolts and Check Co-ordinates and Levels for Canopy Foundation for Seating Area-1
Excavation for MV Line Pit B/MV/04, C/MV/18, C/MV/19, C/MV/21, C/MV/31- as highlighted
Surface Preparation prior to Stone Cladding for Walls of Plant Room (from Inner & Outer sides) of Phy
Weld Visual & NDT Inspection for the Crescent 02, Zone 5 - 2G, Axis 02V to 02Y
Inspection of Alignment for the Installed Baseplates in Crescent 01 Zone 1 - 1K Outer
Shuttering for Mass Concrete of VIP AUDITORIUM axis ( 01VA to 03VA, DVA to 6VA ) Zone 1H (as highli
Installation and Fixation Steel Structures for outer roofs & Centre roof
Inspection of Sand bedding under pipe for Fire & Security Distribution Line between H/FS/18 to H/FS/24
Inspection of Sand Bedding under pipe for Telecommunication Line between H/TL/17 to H/TL/20 at Zone
Inspection and Compaction Test for backfilling sub-grade 4th Layer (4 of 7) around Fire Water Line Pit f
Inspection and Compaction Test for backfilling Sub-grade 4th Layer (4 of 7) around Potable Water Line
Excavation for Non-Potable Water Line at Zone B&C including Pit - NPW-ISC-09, NPW-ISC-10, POC-06 - A
"Inspection of Sand bedding under pipe for Non-Potable Water Line at Zone G - As highlighted (Stock Pi
"Inspection of Waterproofing for Concrete Encasement around the pipe near SBC-06 (Right Side) at Z
"Surface Preparation prior to start backfilling under Non-Potable Water Line upto (-20cm) form FGL nea
First four Cushions installed between Axis 02-AV-/02-AW.
Sand Bedding for water feature lines (part 5 Next level) (HDPE dia 160 mm) from Centre of Geyser Ga
Sand Bedding for water feature lines (part 6 next level) (HDPE dia 250 mm) From entrance of Boat ga
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 5 layers) for water feat
Inspection & Compaction tests of 6th Layer (Sub-Grade) Backfilling (Out of 9 layers) for water featu
Sand Bedding for water feature line (part 6 Branch level above) (HDPE dia 250 mm) Between Water pl
Coordinates & Levels of Footing for Boundary Wall @ Grid (21-28/R), at Energy Center 2, as highlight
Coordinates & Levels of Blinding under Foundation of Boundary Wall at Span 12, at Water Garden, as
Completion of Stacked Boulders with Grouting for All Layers at Between Boat Garden lake and Boundar
Concrete Pouring & Shuttering for Footing of Boundary Wall @ Grid (21-28/R), at Energy Center 2, as
Concrete Pouring for Blinding under Foundation of Boundary Wall at Span 12, at Water Garden, as Hig
Steel Reinforcement for Footing of Boundary Wall @ Grid (21-28/R), at Energy Center 2, as highlighte
Protection layer of 4mm thick bituminous protection board for Foundation of Plant Room (Inner side),
Level and Location for Diaphragm Wall foundation axis 02/AQ Zone 2N as highlighted
Level and Location for walls(W13 ,W9,W8) at CAFETERIA zone 2A (as highlighted)
Level and location for RING BEAM Zone 2R (OUTER) Axis 02-2, 02AZ to 02BC (as highlighted), KAIG3-SC
Level and Location for MCPE 2 wall inner & counterfort at axis 02/AB to 03/J zone 2H As highlighted
Level and Location for Anchor bolt PG 430-50-70, PF 430-70-70 under POT BEARING at PROMENADE BRI
Level and Location for RING BEAM Zone 1L (OUTER) Axis 01-2, 01AG to 01AJ (as highlighted)
Level and Location for Blinding of Strip Footing Between PC 92-94 Zone 2A (as highlighted)
Level and Location for Excavation for Strip Footing Between PC 92-94 Zone 2A (as highlighted)
Installation and Survey Report for Location and Levels of Anchor Bolts for RING BEAM Zone 1L (OUTER)
Weld Visual & NDT Inspection for the Crescent 02, Zone 6 - 2F, Axis 02T to 02V
Surface Preparation and Paint Touch Up Inspection for the Metal Cladding in Crescent 02, Zone 2 - 2
Pre-Assembly Bolt Tightening Inspection of Crescent 01, Zone 3 - 1F, Axis 01P to 01R
Shuttering for Diaphragm Wall foundation axis 02/AQ Zone 2N as highlighted
Steel Reinforcements for Diaphragm Wall foundation axis 02/AQ Zone 2N as highlighted
Steel Reinforcements for MCPE 2 Counter fort (inner) at axis 03L to 0M As highlighted
Shuttering for walls(W13 ,W9,W8) at CAFETERIA zone 2A (as highlighted)
Anti Termite application under Blinding of Strip Footing Between PC 92-94 Zone 2A (as highlighted)
Shuttering of Blinding of Strip Footing Between PC 92-94 Zone 2A (as highlighted)
Shuttering and Scaffoldings for RING BEAM Zone 1L (OUTER) Axis 01-2, 01AG to 01AJ (as highlighted)
Steel Reinforcements and Shear Connector for RING BEAM Zone 1L (OUTER) Axis 01-2, 01AG to 01AJ (
Concreting for RING BEAM Zone 2R (OUTER) Axis 02-2, 02AZ to 02BC (as highlighted)
Shuttering & Scaffolding for RING BEAM Zone 2R (OUTER) Axis 02-2, 02AZ to 02BC (as highlighted)
Concreting for MCPE 2 wall inner & counterfort at axis 02/AB to 03/J zone 2H As highlighted
Protection layer of 4mm thick bituminous protection board for wall with counterfort for mcpe1 from le
Inspection and compaction test 2nd layer Backfill for MCPE 3 Inner wall Axis 03A to 02S (as highlighted)
Concreting for RAFT foundation of South watch tower Zone 7 TOC 858.90
Concreting for 1st layer Mass Concrete of Central Bridge Foundation (as highlighted) Zone 4 Grid 1M
Inspection and compaction test 1st layer Backfill for MCPE 3 Inner wall Axis 03A to 02S (as highlighte
Installation of straight PVC Conduit (Dia. 25mm) and Boxes for Fire Alarm (Speaker, Break Glass, Inte
Level and Location for RING BEAM Zone 1K (INNER) Axis 01-1, 01AD to 01AG (as highlighted)
Installation and Survey Report for Location and Levels of Anchor Bolts for RING BEAM Zone 1K (INNE
Singe layer of 4mm thick modified bituminous waterproofing membranbe for Infill wall between Buttre
Surface Preparation and Solvent base Primer for Infill wall between Buttress BI 25-26 level 871.00 (a
Shuttering and Scaffoldings for RING BEAM Zone 1K (INNER) Axis 01-1, 01AD to 01AG (as highlighted)
Shuttering for MCPE 2 wall inner & counterfort at axis 02/AB to 03/J zone 2H As highlighted
Steel Reinforcements and Shear Connector for RING BEAM Zone 1K (INNER) Axis 01-1, 01AD to 01AG
Grouting of Installed Anchor bolt and under Baseplate at Zone 1J INNER & OUTER ring beam (as hi
Grouting of Installed Anchor bolt and under Baseplate at Zone 1J INNER & OUTER ring beam (as hig
Concreting of Mass concrete of Strip Footing Between PC 118 - 120 Zone 2E (as highlighted)
Level and Location for walls (W10) and Isolated Circular Columns (C9 )at CAFETERIA zone 2A (as highlig
Steel Reinforcements for walls (W 11) at CAFETERIA zone 2A (as highlighted)
Concreting for mass concrete (2nd layer) under strip footing between PC ( 152-158 )inner Zone 2K (a
Shuttering for walls (W10) and Isolated Circular Columns (C9 )at CAFETERIA zone 2A (as highlighted)
Concreting and Shear Connector for Buttress with Beam BOV, BIV 54, 55 Zone 1N 1P (as highlighted)
Installation of straight UPVC Conduit (Dia.25mm) and Box for Voice and Data (WIFI) at Buttress Axis (
Installation of straight PVC Conduit (Dia.25mm) and Box for Fire Alarm (Speaker) at Infill Wall betw
Installation of straight UPVC Conduit (Dia.25mm) and Box for Fire Alarm (Speaker) at Buttress Axis (0
Installation of UPVC Conduit (Dia. 25mm) Low Current Ducts Passing the Abutment Wall (Data) Axis (
Installation of straight UPVC Conduit (Dia.25mm) and Box for Voice and Data (WIFI) at Buttress Axis (
Installation of straight UPVC Conduit (Dia.25mm) and Box for Fire Alarm (Speaker) at Buttress Axis (0
Installation of straight UPVC Conduit (Dia.25mm) and Box for Voice and Data (WIFI) at Crescent-02 Inf
"Installation of straight UPVC Conduit sleeve (2x75mm) for Fire Alarm & Security Cables (MICC Cables) a
"Installation of straight UPVC Conduit sleeve (2x75mm) for TELECOM Cables (SM Fiber Optic Cables / CA
Installation of straight UPVC Conduit (4x160mm) Medium Voltage Ductbank no. BG/D-MV/07 (from
Concreting for Infill wall between PC 74-75 inner between Gridline 02M- 02N (As highlighted) ZONE
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 3) above Sand Covering for N
Inspection of Sand Covering Layer for Protection of MV Line from (B/MV/17 to C/MV/02) at Zone-B&G -
Inspection of Concrete Pouring for Side Walls of MV Line Pulling Pit - B/MV/23, G/MV/21 at Zone-B&G (A
Inspection of Formwork for Side Walls of MV Line Pulling Pit - B/MV/23, G/MV/21 at Zone-B&G (As Highl
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 3) above Sand Covering for N
Excavation for Fire & Security Distribution Line between H/FS/18 to H/FS/24 Including Pit H/FS/18 at Zo
Excavation for Telecommunication Line between H/TL/17 to H/TL/20 including pit H/TL/17 at Zone-H as
"Surface Preparation prior to start Waterproofing for Concrete Encaseent around the pipe near SBC-0
Inspection and Compaction Test for backfilling Sub-grade 5th Layer (5 of 5) around Potable Water Line
Inspection and Compaction Test for backfilling Sub-grade 4th Layer (4 of 5) around Potable Water Line
Inspection of Sand bedding under pipe for Non-Potable Water Line near Tower-1 at Zone D - as highlight
"Excavation for Non-Potable Water Line at Zone G including Pit - NPW-ISC-18, POC-11 - As highlighted "
Excavation for Non-Potable Water Line near Tower-1 at Zone D - as highlighted
Concreting for RING BEAM Zone 2R (INNER) Axis 02-1, 02AZ to 02BC (as highlighted)
Concreting for mass concrete under strip footing between PC ( 152-158 )inner Zone 2K (as highlighte
Inspection and compaction test 3rd layer for Backfilling between PC 77 & 79 Zone 1N (as highlighted
Two layer of 4mm thick modified bituminous waterproofing membrane for wall with counterfort for
Single layer of 4mm thick modified bituminous waterproofing membrane for RC Strip Footing betwe
Concreting for mass concrete (2nd layer) for Central Bridge foundation Zone 4 grid 1M (as highlighted)
Concreting for walls(W14 ,W15,W19) at CAFETERIA zone 2A (as highlighted)
Pre-Assembly Bolt Tightening Inspection of Crescent 02, Zone 6 - 2F, Axis 02T to 02V
Bolt Tightening Inspection of Crescent 02, Zone 4 - 2J from Axis 02AE to 02AB
Concreting for Infill wall between Butress 71-72 between Gridline 2K - 2J (As highlighted) ZONE 2D
Inspection & Compaction Tests for 1st Layer (Sub Grade) Backfilling (Out of 5 layers) Surround (30 n
Inspection & Compaction Tests for 1st Layer (Sub Grade) Backfilling (Out of 5 layers) Surround (25 n
Installation of UPVC Conduit Sleeve (Dia. 110mm) Low Current Ductbank no. D-LC-PC/64 Passing the In
Installation of straight UPVC Conduit (Dia. 110mm) for Telecommunication Ductbank connected to Te
Installation of straight UPVC Conduit (Dia. 110mm) for Fire & Security Ductbank connected to Fire &
Inspection & Compaction tests of Single Layer Backfilling (Sub-Grade) (Upto B.O.B level) for Foundatio
Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Grade) (Out of 9 layers), for Foundation
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 5 layers) for Foundation o
Inspection & Compaction tests of 2nd Layer (Sub-Grade) Backfilling (Out of 4 layers) for Water Featu
Inspection & Compaction tests of Single Layer Backfilling (Sub-Grade) (Upto B.O.B level +875.379) fo
Sand Cover & Pipe Protection for water feature lines (part 6) (HDPE dia 250 mm) From entrance of Bo
Inspection & Compaction tests of 3rd Layer Backfilling (Out of 3 layers Sub-Grade and final layer Sub
Inspection & Compaction tests of 5th (Final) Layer (Sub-Grade) Backfilling (Out of 5 layers) for wate
Inspection & Compaction tests of 4th (Final) Layer (Sub-Grade) Backfilling (Out of 4 layers) for wate
Inspection & Compaction tests of 5th (Final) Layer (Sub-Grade) Backfilling (Out of 5 layers) for wate
Weld Visual & NDT Inspection for the Baseplate Washer plates in Aviary Garden from Grid Line 01 to
Pipe Sleeves Installation of infill Wall Mechanical (CHW&Fire) From Axis (02/2 to 02/BC ) At Cresce
Installation of Main Potable Water Pipes (75&50mmØ-UPVC-Class-5) at Zone L&M - Next to Pit - L/PW
Installation of Main Fire Water Pipes (160mmØ-UPVC-Class-5) Next to Pit (L/F/12) to Pit (M/F/01) I
Installation of straight UPVC Conduit sleeve ( UPS Ckt. / Emergency Lighitng Ckt. - 3x75mm & Small Pow
Pipe Installation of Sub-Surface Drainage (Main Line & Branches) Pipes; (110 &160 mmØ, UPVC-CLASS
Installation of EMT Conduit (Dia. 20mm) and Box for Power (Fused Connection Unit & Connection Uni
Installation of straight UPVC Conduit sleeve (4x110mm Lighting & Power Ckt. and 8x160mm LV Power Cab
Installation of straight PVC Conduit (Dia.25mm) and Box for Voice and Data (WIFI) at the Crescent-02
Installation of straight PVC Conduit (Dia.25mm) and Box for Fire Alarm (Speaker & Flashing Beacon) at
Installation of EMT Conduit (Dia. 20mm) and Box for Voice and Data (Data, Telephone & WIFI) at Man
Installation of EMT Conduit (Dia. 20mm) and Box for Fire Alarm (Smoke Detector, Flashing Beacon,
Inspection & Compaction tests of 1st Layer (Sub-Grade) Backfilling (Out of 4 layers) for Water Featu
Excavation and Surface preparation for Foundation of Seat Walls (08 no's) inside Butterfly Garden, as
Steel Reinforcement for Precast Panel type 3, as Mockup (Location behind steel workshop) for Butterf
Steel Reinforcement for Footings of Seat Walls (Inner), Inside Physic Garden as highlighted area in at
Concrete Pouring & shuttering for Walls of Wet Well E, (upto Level +872.10), Inside Water Garden as
Steel Reinfotcmenet for Slab of New Ticketing Booth # 2A, As per Attached Highlighted Drawing's.
Concrete pouring & Shuttering for walls of New ticketing booth # 3A, As per Attached Highlighted Dra
Coordinates & Levels of Footings for Seat Walls (Inner), Inside Physic Garden as highlighted area in a
Coordinates & Levels for Walls of Wet Well E, (upto Level +872.10), Inside Water Garden as highlight
Coordinates & Levels of walls for New ticketing booth # 3A, As per Attached Highlighted Drawing's.
Inspection of Thrust Block for UPVC Pipe (160 mm Dia) for Fire Water Line at Zone- M - As Highlighte
"Inspection of Thrust Block for Potable Water Line ( Dia 80 & 50mm) at Zone-M - As Highlighted (SCR
Inspection of Concrete Pouring for Canopy Column Neck of Seating Area (1) at Zone-G (SA-13) - As Highl
"Inspection of Formwork for Canopy Column Neck of Seating Area (1) Zone-G (SA-13) - As Highlighted"
Inspection of Concrete Pouring for MV Line Pulling Pit - F/MV/08, G/MV/28 at Zone-F&G (As Highlighted
Inspection of Formwork for MV Line Pulling Pit - F/MV/08, G/MV/28 at Zone-F&G (As Highlighted)
Inspection of Steel Reinforcement for MV Line Pulling Pit - F/MV/08, G/MV/28 at Zone-F&G (As Highligh
"Surface Prepatio prior to start back filling around Non-Potable water line Pit - NPW-ISC-01, NPW-IS
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 3) above Sand Covering for Fir
Inspection for Blinding Concrete under MV Line Pit C/MV/15, G/MV/30, H/MV/25, H/MV/02, H/MV/11,
Excavation for MV Line Pit C/MV/15, G/MV/30, H/MV/09- as highlighted
"Inspection of Concrete (Plain) Pouring for Duct Bank of Fire & Security line from B/FS/04 to B/FS/03 a
Inspection of Concrete (Plain) Pouring for Duct Bank of Telecommunications line from B/TL/30 to B/TL/3
Shuttering for walls(W20,W21) undercroft at CAFETERIA zone 2A (as highlighted) 869.10
Level and Location for Retaining Wall Promenade Bridge Abutment at Grid M Zone 4 as highlighted
Level and Location for walls(W20,W21) undercroft at CAFETERIA zone 2A (as highlighted) 869.10
Level and Location for Mass concrete of Strip Footing Between PC 118 - 120 Zone 2E (as highlighted)
Steel Reinforcements for Infill Wall at Zone 2C between Between Gridline 02-2/I - 02-2/J (as highlighted
Steel Reinforcements for Buttress with Beam BIV BII 56, 57 Zone 1P (as highlighted)
Shuttering of Mass concrete of Strip Footing Between PC 118 - 120 Zone 2E (as highlighted)
Concreting for Infill wall (1st stage) between Butress inner 72-73 between Gridline 2K - 2L (As highligh
Anti Termite application under Mass concrete of Strip Footing Between PC 118 - 120 Zone 2E (as highlig
Inspection of Concrete (Plain) Pouring for the Duct Bank of MV Line from C/MV/02 to C/MV/40 at Zone-
Sand Covering Layer for Protection of Telecommunications Line from (B/TL/51 to B/TL/32) at Zone-B as
Sand Covering Layer for Protection of Fire & Security Distribution Line from (B/FS/44 to B/FS/31) at Zo
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 1) above Sand Cover for Potabl
Installation of Anchor Bolts and Check Co-ordinates and Levels for Canopy Foundation for Seating Area-1
Inspection for Blinding Concrete under Potable Water Line Pit F/PW/14, F/PW/15, F/PW/08, F/PW/02 -
Inspection for Blinding Concrete under Fire Water Line Pit for F/F/01, F/F/03, F/F/10 at Zone-F - as highl
Inspection for Blinding Concrete under Potable Water Line Pit F/PW/15, F/PW/08, F/PW/02 - as highlig
Inspection for Blinding Concrete under Fire Water Line Pit for F/F/10 at Zone-F - as highlighted
Sand Covering Layer for Protection of Telecommunications Line from (B/TL/12 to B/TL/15) at Zone-B as
Sand Covering Layer for Protection of Fire & Security Distribution Line from (B/FS/15 to B/FS/17) at Zo
Inspection for Installation of MV Line Junction Pit - H/MV/07, L/MV/03 - as highlighted
Inspection of Excavation for Heating and Chilled Water Line including Pit B/DC/07, AV-02, AV-01, B/DC/
Inspection for Blinding Concrete under MV Line Pit B/MV/10, C/MV/18, C/MV/19, C/MV/31, C/MV/21 -
Surface Prepatio prior to start back filling around Non-Potable water line Pit - NPW-ISC-12, NPW-ISC-13
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 3) above Sand Cover at Zone - F
Shuttering for mass concrete (2nd layer) under strip footing between PC ( 152-158 )inner Zone 2K (as hi
Level and Location for Mass Concrete for Strip Footing Between PC 132 - 134 Zone 2F (as highlighted)
Anti Termite application under Blinding of Strip Footing Between PC 132 - 134 Zone 2F (as highlighted)
Shuttering of Mass Concrete for Strip Footing Between PC 132 - 134 Zone 2F (as highlighted)
Concreting of Mass Concrete for Strip Footing Between PC 132 - 134 Zone 2F (as highlighted)
Bolt Tightening Inspection of Crescent 02, Zone 4 - 2L from Axis 02AL to 02AH
Inspection of Installation and Alignment for the Crescent 02, Zone 4 2J, from Axis 2AE to 2AB
Inspection of Installation & Bolt Tightening for the Steel Cover plate in Aviary Garden from Grid Line
Bolt Tightening Inspection of Crescent 02, Zone 4 - 2K from Axis 02AH to 02AE
Bolt Tightening Inspection of Crescent 02, Zone 4 - 2L from Axis 02AL to 02AH
Steel Reinforcements for MCPE 2 Inner counterfort wall Axis 02AH to 02AF at Zone 2J 2k (as highlighted
Level and Location for Buttress with Beam BOV, BIV 54, 55 Zone 1N 1P (as highlighted)
Shuttering and Shear Connector for Buttress with Beam BOV, BIV 54, 55 Zone 1N 1P (as highlighted)
Concreting for slab on grade inside the large mosque,two electricity box for Large Mosque at grid (C1,1
Shutttering for slab on grade inside the large mosque,two electricity box for Large Mosque at grid (C1,
Level and Location for slab on grade inside the large mosque,two electricity box for Large Mosque at gr
Steel Reinforcements for slab on grade inside the large mosque,two electricity box for Large Mosque at
Surface preparation & Base primer coating for RC Strip Footing between PC 150-153 (as highlighted) Z
Surface preparation & Base primer coating Under Strip Footing between PC 126-128 Inner (as highligh
Surface preparation & Base primer coating for MCPE 1 8 isolated foundation & columns (870.00) Grid
Shuttering for MCPE 2 wall & counterfort (inner) at axis 02Z TO 03I As highlighted
Concreting for MCPE 2 wall & counterfort (inner) at axis 02Z TO 03I As highlighted 871.00
Preliminary Inspection of Erected Steel in Crescent 02, Zone 6 2F from Axis 02AR to 02AS
Inspection of Installation and Alignment for the Crescent 01 Zone 5 - 1B, From Axis 01D to 01G
Preliminary Inspection of Erected Steel in Crescent 02, Zone 6 2H from Axis 02AB to 02Z
Level and Location for mass concrete (2nd layer) under strip footing between PC ( 152-158 )inner Zone
Base Seal and Extrusion Aluminum Installation between Axis 02, AP-02, AQ.
Base Seal and Extrusion Aluminum Installation between Axis 02, AQ-02, AR.
Base Seal and Extrusion Aluminum Installation between Axis 02, AR-02, AS.
Base Seal and Extrusion Aluminum Installation between Axis 02, AS-02, AT.
Base Seal and Extrusion Aluminum Installation between Axis 02, AT-02, AU.
Base Seal and Extrusion Aluminum Installation between Axis 02, AU-02, AV.
Excavation for strip footing between PC 118-120 Zone 2E (as highlighted)
Level and Location for MCPE 2 wall & counterfort (inner) at axis 02Z TO 03I As highlighted 871.00
Surface preparation & Base primer coating for wall with counterfort for mcpe1 from level 869 to level
Installation of straight UPVC Conduit (Dia. 160mm) Medium Voltage Ductbank no. GG/D-MV/17 (fro
Installation of straight PVC Conduit (Dia. 25mm) and Boxes for Fire Alarm (Interface Unit) at the Caf
Base Seal and Extrusion Aluminum Installation between Axis 02, AX-02, AY.
Inspection of Installation & Bolt Tightening for the PTFE Steel Frame in Aviary Garden from Grid Line
Grouting for Stone Cladding of Boundary wall (Outer Side) at Span 31, 32, 33 & 34, As per Attached H
Grouting for Stone Cladding of Boundary wall (Outer Side) at Span 27, 28, 29 & 30, As per Attached H
Grouting for Stone Cladding of Boundary wall (Outer Side) at Span 23, 24, 25 & 26, As per Attached H
Aluminium flashing and Sealant on water proofing of Columns & Walls Sides at Grid (B/1-21) & (1&21/A
Slated Layer 4mm thk Modified Bituminous Membrane on Water Proofing on Columns & Walls Sides at G
Steel Reinforcement for Walls of Wet Well F, (upto +872.50), Inside Water Garden as highlighted area
Steel Reinforcement for Walls of Wet Well (E), Inside Water Garden as highlighted area in attached dr
Concrete pouring for Blinding under Storm Water Manholes of 3nos (MH-D-07-01), (MH-D-07-02) and (
Surface Preparation prior to Backfilling for area's of Jetty 1 & 2, at Boat Garden, inside Water Garden
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 5 layers) for water featu
Inspection & Compaction tests of 5th (Final) Layer Backfilling (Sub Base) (After 4 layers Sub-Grade) fo
Sand Bedding for Water Feature Lines (HDPE), Surround Boat garden Lake, Inside Water Garden as hig
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 9 layers), for Foundation
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 5 layers) for Foundation o
Inspection & Compaction tests of 10th Layer Backfilling (Sub-Grade) (Out of 11 layers), for Foundatio
Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Grade) (Out of 5 layers) inside the Bounda
Excavation & Surface preparation for Foundation of Boundary Wall at Span 12, at Water Garden, as Hi
Installation of Water Feature Puddle Flanges; (315&200mmØ UPVC CLASS 5) ; For wet well (E&F) at
'Potable Water Pipes Sand Cover & Pipes Protection (30 cm above Pipes). As per highlighted Area in
Inspection for Installation of MV Line Junction Pit - H/MV/03 - as highlighted
Inspection of backfilling Gravel 1st and 2nd Layer (2 of 2) For Manhole FW-A-20 - As Highlighted (Stock P
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 2) beside Fire Water Line at Zon
Inspection of Sand Beding under pipe for Fire Water Line at Zone-L - as highlighted (Stock Pile # 132)
Inspection of Sand bedding under pipe for Potable Water Line at Zone-L - as highlighted (Stock Pile # 13
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 3) above Sand Covering for No
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 3) above Sand Covering for Fir
Surface Preparation prior to Water Proofing for Foundation of Plant Room (Outer side), at Physic gard
Single layer 4mm thick modified bituminous waterproofing membrane for Foundation of Plant Room (In
Steel Reinforcements for Columns (C9 )for CAFETERIA (as highlighted) ZONE 2A
Protection layer of 4mm thick bituminous protection board for MCPE 3 wall and foundation inner Grid (
Shuttering for RAFT foundation of South watch tower Zone 7 TOC 858.90
Level and Location for RAFT foundation of South watch tower Zone 7 TOC 858.90
Concrete Pouring & Shuttering for Footing of Boundary Wall @ Grid (29-30/M-R), at Energy Center 2,
Steel Reinforcements for RAFT foundation of South watch tower Zone 7 TOC 858.90
Steel Reinforcement for Footing of Boundary Wall @ Grid (29-30/M-R), at Energy Center 2, as highlig
Concrete Pouring for Blinding under Foundation of Boundary Wall @ Grid (4-14/L and R/16-22), at Ene
Concreting for RC Strip Footing between PC 97-99 Zone 2B (as highlighted)
Shuttering for RC Strip Footing between PC 97-99 Zone 2B (as highlighted)
Level and Location for RC Strip Footing between PC 97-99 Zone 2B (as highlighted)
Steel Reeinforcements for RC Strip Footing between PC 97-99 Zone 2B (as highlighted)
Level and Location for Retaining Wall at Grid 01/M-01/K Zone 1D as highlighted
Shuttering for Retaining Wall at Grid 01/M-01/K Zone 1D as highlighted
Surface Preparation prior to Start backfilling at MCPE 3 Inner wall Axis 03A to 02S (as highlighted)
Inspection and compaction test 1st & 2nd layer for Backfilling between PC 77 & 79 Zone 1N (as highlig
Inspection and compaction test 5th layer for backfilling of PC beside STRIP FOOTING between PC 77-79
Coordinates & Levels for Footing of Boundary Wall @ Grid (29-30/M-R), at Energy Center 2, as highlig
Steel Reeinforcements for Retaining Wall at Grid 01/M-01/K Zone 1D as highlighted
Coordinates & Levels for Blinding under Foundation of Boundary Wall @ Grid (4-14/L and R/16-22), at
Concrete Pouring for Thrust Blocks for Water Feature Lines (Main 110 dia & Sub 63mm 4 no's) from Pl
Inspection & Compaction tests of 9th Layer Backfilling (Sub-Grade) (Out of 11 layers), for Foundation
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 5 layers) inside the Bounda
"Inspection of Concrete Pouring around the pipe near SBC-06 (Right Side) at Zone-4 - As Highlighte
"Inspection of formwork around the pipe near SBC-06 (Right Side) prior to Casting the concrete at Z
Inspection of Concrete Pouring for Canopy Column Neck of Seating Area (1) at Zone-G (SA-12) - As Highl
"Inspection of Formwork for Canopy Column Neck of Seating Area (1) Zone-G (SA-12) - As Highlighted"
Inspection and Compaction Test for backfilling sub-grade 3rd Layer (3 of 7) around Fire Water Line Pit f
Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 7) around Potable Water Line
Inspection and Compacton Test for backfilling Sub-grade 9th Layer (9 of 10) around SBC-08 (Wing Wall) -
Excavation for MV Line Pit B/MV/04, C/MV/18, C/MV/19, C/MV/21, C/MV/31- as highlighted
Inspection for Blinding Concrete under MV Line Pit C/MV/23 - as highlighted
"Inspection and Compaction Test for backfilling sub-grade 3rd Layer (3 of 4) for the Duct Bank of MV
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 2) above Sand Covering for Fi
Installation of Anchor Bolts and Check Co-ordinates and Levels for Canopy Foundation for Seating Area-1
Weld Visual & NDT Inspection for the Baseplate Washer Plates in Crescent 02, Zone 5 2G & 2H
Pre-Assembly Bolt Tightening Inspection of Crescent 02, Zone 5 - 2G, Axis 02Y to 02V
Weld Visual & NDT Inspection for the Crescent 02, Zone 5 - 2H, Axis 02AB to 02Y
Weld Visual & NDT Inspection for the Baseplate Washer Plates in Crescent 02, Zone 6 2E & 2F
Weld Visual & NDT Inspection for the Baseplate Washer Plates in Crescent 02, Zone 4 2J
Inspection and compaction test 5th & 6th layer for backfilling of MCPE 1 axis 02/AN to 02/AP (as highl
Steel Reinforcements for Infill Wall at Zone 2R TIP UPTO 870.15 (as highlighted)
Grouting of Installed Anchor bolt PG 430-50-70, PF 430-70-70 under POT BEARING at PROMENADE BR
Concreting for Isolated Circular Columns (C4, C7 )for CAFETERIA (as highlighted) ZONE 2A
Concreting for Isolated Circular Columns (C5 )for CAFETERIA (as highlighted) ZONE 2A
Level and Location for two walls electricity box for Large Mosque between axis (c-c1 and 1-2) ZONE 1G
Level and Location for Large Mosque Ground floor Columns At Axis C1-2 & E-5.1 As highlghted
Concreting for Large Mosque Ground floor Columns At Axis C1-2 & E-5.1 As highlghted
Shuttering for Large Mosque Ground floor Columns At Axis C1-2 & E-5.1 As highlghted
Steel Reinforcements for MCPE 2 Counter fort wall (inner) at axis 02/Z & 02/AB to 03/J & 02/AD to 02/
Steel Reeinforcements for Strip Footing between PC 16-18 Zone 1C (as highlighted)
Shuttering for Strip Footing between PC 16-18 Zone 1C (as highlighted)
Concreting for Strip Footing between PC 16-18 Zone 1C (as highlighted)
Level and Location for Strip Footing between PC 16-18 Zone 1C (as highlighted)
Shuttering for Large Mosque Shaft, Electricity Box and Grade Beam and Ground floor Slab (as highlighted)
Concreting for Large Mosque Shaft, Electricity Box and Grade Beam and Ground floor Slab (as highlighted)
Primary Inspection For Installation Tents For Aviary - PTFE 1150 .As per High lighted Attached Appr
Excavation for Central Bridge axis (02/AL - 02/AK) zone 4 (as highlighted)
Level and Location for Infill wall between PC 74-75 inner between Gridline 02M- 02N (As highlighted)
'Warning Tape Installation of Potable Water Pipe for (160&75mmØ-UPVC-Class-5). As per highlighted
Steel Reinforcements for Infill wall axis ( 02/2, 02/F, 02/E) (As highlighted) ZONE 2B
'Warning Tape Installation of Fire Fighting Networks for (200&160mmØ-UPVC-Class-5). As per highlig
Shuttering for Infill wall between PC 74-75 inner between Gridline 02M- 02N (As highlighted) ZONE 2D
Level and Location for Infill wall between PC 96-97 inner between Gridline 02AD- 02AE (As highlighted)
Shuttering for Infill wall between PC 96-97 inner between Gridline 02AD- 02AE (As highlighted) ZONE 2J
Steel Reinforcements for Infill wall between BIV 108-109 beside Gridline 02-1 AM - 02-1 AN (As highli
Installation of EMT Conduit (Dia. 20mm) and Box for Fire Alarm (Smoke Detector, Voice Alarm & Ro
Installation of EMT Conduit (Dia. 20mm) and Box for Voice and Data (Data, Telephone) at Managem
Installation of straight PVC Conduit (Dia.25mm) and Box for Fire Alarm (Break Glass) at Public Toilets
Installation of straight PVC Conduit (Dia.25mm) and Box for Voice and Data (Telephone) at Public Toi
Installation of straight UPVC Conduit (4x110mm) for Low Current (TELECOM) Ductbank no. BB/D-TL/
Installation of straight UPVC Conduit (2x110mm) for Low Current (Fire and Security) Ductbank no.
Installation of straight PVC Conduit (Dia.25mm) and Box for Fire Alarm (Speaker) at Infill Wall betw
Installation of straight PVC Conduit (Dia.25mm) and Box for Security System (CAM) at Infill Wall bet
Installation of straight PVC Conduit (Dia.25mm) and Box for Voice and Data (CAM) at Infill Wall betw
Installation of straight PVC Conduit (Dia.25mm) and Box for Fire Alarm (Speaker) at Infill Wall betwe
Installation of UPVC Conduit (Dia. 25mm) Low Current Ducts Passing the Abutment Wall (Data) Axis (
Installation of UPVC Conduit Sleeve (Dia. 110mm) Low Current Ductbank no. D-LC-PC/62 Passing the I
Installation of straight UPVC Conduit (Dia. 160mm) Medium Voltage Ductbank no. HH/D-MV/27
Installation of straight UPVC Conduit (Dia. 32mm) & Boxes for Power System (Cleaner Socket & Fused
Installation of straight UPVC Sleeve (Dia.160mm) Low Voltage (Submain Cables) at the Crescent-02
Installation of UPVC Conduit (Dia. 25mm) & Boxes for Lighting System (Lighting Fixture) at New Ticke
Installation of PVC Conduit (Dia. 25mm) for Lighting (EXIT Sign) at the Crescent-02 at the Infill Wal
Completion of Stack Boulders with Grouting at Left side of Planted Bed 1, (Part 2), Inside Water Play
Inspection of External Plastering (Final Coat) for External Elevations at Site Tower 2, as per the atta
Sand Cover & Pipe Protection for Water Feature Lines (HDPE dia 110 mm Supply) from water feature pl
Excavation and Bed preparation for Water Feature Lines (HDPE), Surround Boat garden Lake, Inside W
Inspection & Compaction tests of 4th Layer (Sub-Grade) Backfilling (Out of 5 layers) for water featur
Inspection & Compaction tests of 4th Layer (Sub-Grade) Backfilling (Out of 6 layers) for water featu
Sand Cover & Pipe Protection for water feature lines (part 7) (HDPE dia 160 mm) between Water play
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 5 layers) inside the Bounda
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 9 layers), for Foundation
Inspection & Compaction tests of 8th Layer Backfilling (Sub-Grade) (Out of 9 layers), for Foundation
Soil preparation Prior to Backfilling @ Grid (11-15/A-L), inside Energy Center 2, as highlighted area in
Solvent Base Primer Coating prior to Membrane Water Proofing for Foundation of Plant Room (Inner si
Installation of UPVC Conduit (Dia. 25mm) and Box for Fire Alarm (Smoke Detector & Voice Alarm) at t
"Inspection of Concrete Pouring for MV Line Pulling Pit - G/MV/21 at Zone-G (As Highlighted) "
"Inspection of Formwork for MV Line Pulling Pit - G/MV/21 at Zone-G (As Highlighted) "
Inspection of Steel Reinforcement for MV Line Pulling Pit - G/MV/21 at Zone-G (As Highlighted)
Inspection for Installation of MV Line Junction Pit - B/MV/06 - as highlighted
"Surface Preparation Prior to Start Backfilling Gravel For Manhole FW-A-20 - AS Highlighted "
Inspection of Sand Covering to protect the pipe for Non-Potable Water Line at Zone- K - as highlighted
Inspection and Compacton Test for backfilling Sub-grade 8th Layer (8 of 10) around SBC-08 (Wing Wall) -
Excavation for Fire Water Line at Zone-L including Pit L/F/08, L/F/09, L/F/10, L/F/11 - as highlighted
Excavation for Potable Water Line at Zone-L - as highlighted
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 2) above Sand Covering for Fir
Inspection of installation and alignment for the crescent 02, zone 4 2K, from axis 2AH to2AE (area hi
Weld VIsual & NDT inspection for the baseplate washer plates in Crescent 02, Zone 4 2K (as per highl
Installation and Survey Report for Location and Levels of Anchor Bolts for RING BEAM Zone 2R (INNER)
Inspection and compaction test 5th & 6th layer for backfilling PC between PC 80 to 79 Zone 1N (as high
Surface Preparation and Solvent Base Primer for MCPE 1 inner Wall and foundation level: 870.00 (as h
Level and Location for RING BEAM Zone 2R (INNER) Axis 02-1, 02AZ to 02BC (as highlighted)
Level and Location for Infill Wall at Zone 2N between BI 114-115 Between Gridlines 02-1 AR-AS (as high
Level and Location for walls(W14 ,W15,W19) at CAFETERIA zone 2A (as highlighted)
Notification to start Excavation Prior to start Excavation for Cenozoic Garden zone 4
Notification to start Excavation Prior to start Excavation for Jurassic Garden zone 5
Steel reinforcements for South Watch Tower Abutment Retaining wall foundation at Grid 2C (as highlig
Shuttering for South watch tower Abutment wall kicker at Grid 02/C (as highlighted)
Shuttering for walls(W14 ,W15,W19) at CAFETERIA zone 2A (as highlighted)
Concreting and Scaffoldings for RING BEAM Zone 1K (2ND OUTER) Axis 01-2, 01AF to 01AG (as highlight
Inspection Of Pipe Installation For Non-Potable Water (Irrigation Line ); (200mmØ- UPVC-Claas-5 );
Concreting for Cafeteria Wall 33, 34, 35 Zone 2A Elev. 869.100 (as highlighted) (undercroft)
Concreting for Blinding under South Watch Tower foundation at Zone 27 (as highlighted)
Concreting and Scaffoldings for RING BEAM Zone 1K (1ST OUTER) Axis 01-2, 01AD to 01AE (as highlighte
Pipe sleeve installation for inner strip footing ; (160mmØupvc class 4) Between axis (02U to 02V) at
'Fire Fighting Networks Sand Cover & Pipes Protection (30 cm above Pipes). As per highlighted Area
Protection layer of Geotex and 50mm Screed Under Strip Footing between PC 13-15 (as highlighted) Zo
Steel Reinforcements for Retaining Wall Promenade Bridge Abutment at Grid M Zone 4 as highlighted
Single layer of 4mm thick modified bituminous waterproofing membrane Under Strip Footing between P
'Potable Water Pipes Sand Cover & Pipes Protection (30 cm above Pipes). As per highlighted Area in
Protection layer of Geotex and 50mm Screed Under Strip Footing between PC 20-22 (as highlighted) Zo
Shuttering for Retaining Wall Promenade Bridge Abutment at Grid M Zone 4 as highlighted
Concreting for Retaining Wall Promenade Bridge Abutment at Grid M Zone 4 as highlighted
Pipe Sleeves Installation of infill Wall Mechanical (Non-Potable,Potable & Fire) At Crescent 2; (U
Concerting for mass concrete under strip footing between PC( 126-128 )inner Zone 2F (as highlighted)
Shuttering for mass concrete under strip footing between PC( 126-128 )inner Zone 2F (as highlighted)
Pipe Sleeves Installation of infill Wall Mechanical CHW At Crescent 2; (UPVC Pipe Class 4 dia 315 m
Antitermite for mass concrete under strip footing between PC( 126-128 )inner Zone 2F (as highlighted)
Inspection of drainage modification as per new architect layout for executed works done by 2nd stage
Grouting for Stone Cladding of Boundary wall (Outer Side) at Span 62, 66A & 66B and Column C67A (Al
Grouting for Stone Cladding of Boundary wall (Inner Side) at Span 67C & 68A and Column C68B (All Si
Grouting for Stone Cladding on Column's C15, C16, C17 & C18 (All Sides), As per Attached Highlighted
Surface Preparation prior to Water Proofing for Foundation of Plant Room (Inner side), Inside Physic
Mockup for Installation of Fire Hose Cabinet into the Wall inside Office (GF 5067) at Grid (V/4), a
Inspection of Metal Plaster Grove for External Elevations (Remaining Parts) at Site Tower 2, as per t
Inspection & Compaction tests of 4th Layer Backfilling (Out of 5 layers Sub-Grade and final layer Sub
Inspection and compaction test 11th layer Backfill for MCPE 1 Inner wall at Zone 2M 2N Axis 03R - 03T (
Inspection & Compaction tests of 3rd Layer (Sub-Grade) Backfilling (Out of 4 layers) for water featu
Inspection and compaction test 5th layer for backfilling of MCPE 1 axis 02/AN to 02/AP (as highlighted
1st layer of 4mm thick modified bituminous waterproofing membrane for MCPE 1 inner Wall and founda
Inspection & Compaction tests of 4th Layer (Sub-Grade) Backfilling (Out of 8 layers) in Between the Fo
2nd layer of 4mm thick modified bituminous waterproofing membrane for MCPE 1 inner Wall and founda
Inspection & Compaction tests of 7th Layer Backfilling (Sub-Grade) (Out of 9 layers), for Foundation
Protection layer of 4mm thick bituminous protection board for MCPE 1 inner Wall and foundation level
Surface Preparation prior to Backfilling Surround the Pargola Foundations, at Grid (G & P/3, 4 & 5)
Anti Termite application under Mass Concrete of Central Bridge foundation at Zone 4 (as highlighted)
Shuttering for Infill Wall at Zone 2N between BI 114-115 Between Gridlines 02-1 AR-AS (as highlighted)
Single layer of 4mm thick modified bituminous waterproofing membrane Under Strip Footing between P
Steel Reinforcements for walls(W8 ,W9,W12,W20,W21) at CAFETERIA zone 2A (as highlighted)
Installation of straight UPVC Conduit (4x110mm) for Low Current (TELECOM) Ductbank no. BB/D-TL/
Installation of straight UPVC Conduit (2x110mm) for Low Current (Fire and Security) Ductbank no.B
Shuttering and Scaffolding for RING BEAM Zone 2R (INNER) Axis 02-1, 02AZ to 02BC (as highlighted)
Steel Reinforcements and Shear Connector for Infill wall between BII 7-8 Gridline 01-1/F- 01-1/G (as hi
Concreting for MCPE 2 Columns (C-41 to C-47) at Ground Floor axis 03I to 03I-1 zone 2G, 2H, 2J, 2K (as h
Concreting for (MCPE 1) (8)-Isolated Column at Zone 2M 2N (as highlighted) axis 03R, 03-3, 03-2
Concreting for Infill wall between BII 7-8 Gridline 01-1/F- 01-1/G (as highlighted) Zone 1B
Concreting for Blinding of Diaphragm wall at Zone 2N Axis 02Q (as highlighted)
Single layer of 4mm thick modified bituminous waterproofing membrane for diaphragm wall founation
Surface preparation & Solvent base primer coating for diaphragm wall founation Zone 2N (as Highligh
Concreting for Blinding of Diaphragm wall strip footing at Zone 2N Axis 02Q (as highlighted)
Concreting for Blinding of Diaphragm wall strip footing at Zone 2N Axis 02Q (as highlighted) (2nd)
Concreting for Blinding of Diaphragm wall strip footing at Zone 2N Axis 02Q (as highlighted) (3rd)
Concrerting for Infill wall between BI 5-6 Gridline 01E- 01D (As highlighted) ZONE 1B
Level and Location for Infill wall between (02/L & 02/M) (As highlighted) ZONE 2D
Level and Location for mass concrete under strip footing between PC ( 152-158 )inner Zone 2K (as highl
Antitermite for mass concrete under strip footing between PC ( 152-158 )inner Zone 2K (as highlighted)
Shuttering for mass concrete under strip footing between PC ( 152-158 )inner Zone 2K (as highlighted)
Shuttering for Infill wall between (02/L & 02/M) (As highlighted) ZONE 2D
Level and Location for RING BEAM Zone 1J (OUTER) Axis 01-2, 01AA to 011D (as highlighted)
Inspection and compaction test 3rd & 4th layer for backfilling PC between PC 80 to 79 Zone 1N (as high
Surface Preparation and Paint Touch Up Inspection in Crescent 02 Zone 4, 2L from Axis 02AL to 02AH
Inspection of Alignment for the Installed Baseplates in Crescent 01 Zone 1 - 1J
Inspection and compaction test 1st & 2nd layer for backfilling PC between PC 80 to 79 Zone 1N (as high
Inspection and compaction test 4th & 5th layer for backfilling at TIP Zone 1A(as highlighted) ( 4th & 5t
Inspection and Compaction Test for backfilling sub-grade 2nd Layer (2 of 7) around Fire Water Line Pit f
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 7) around Potable Water Line
Inspection and Compacton Test for backfilling Sub-grade 7th Layer (7 of 10) around SBC-08 (Wing Wall) -
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 3) above Sand Covering for No
Inspection of Formwork for MV Line Pulling Pit - B/MV/23 at Zone-B (As Highlighted)
Inspection of Steel Reinforcement for MV Line Pulling Pit - B/MV/23 at Zone-B (As Highlighted)
Pipe Installation for Showres Drain ( 50, 75mmØ - CI Pipe) According to the Last Approved ARCH Dra
Inspection Of Pipe Installation For Non-Potable Water (Irrigation Line ); (200mmØ- UPVC-Claas-5 );
'Warning Tape Installation For Non-Potable Water (Irrigation Line); (160mmØ- UPVC-Claas-5 ); As pe
'Warning Tape Installation For Non-Potable Water (Irrigation Line); (160mmØ- UPVC-Claas-5 ); As pe
'Warning Tape Installation For Non-Potable Water (Irrigation Line ); (200mmØ- UPVC-Claas-5 ); As p
Excavation and Soil preparation for Pool (1 to 10) inside Butterfly Garden, as highlighted area in atta
2nd Coat Damp proofing for Footings & Neck Column's of Pargola Foundations, at Grid (G & P/3, 4 &
"Inspection and Compaction Test for backfilling sub-grade 2nd Layer (2 of 4) for the Duct Bank of MV
Inspection of Sand bedding under pipe for Fire Water Line at Zone-L - as highlighted (Stock Pile # 132)
Inspection of Sand bedding under pipe for Potable Water Line at Zone-L - as highlighted (Stock Pile # 13
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 2) above Sand Covering for Fir
"Inspection of Thrust Block for Potable Water Line ( Dia 160mm & 80mm) at Zone-F - As Highlighted
Inspection of Thrust Block for UPVC Pipe (160 mm Dia) for Fire Water Line at Zone- F - As Highlighted
Installation of UPVC Conduit Sleevs (Dia. 75mm) Low Current (Fiber Optic Cables) from (MH/ZG/T
Installation of UPVC Conduit Sleevs (Dia. 75mm) Low Current (Fire and Security) from (MH/ZG/FA/1
Inspection of Block Work From Lintel upto Final height, at Grid (9/B-E, F), Inside Management Buildin
Grouting for Stone Cladding of Boundary wall (Inner Side) at Span 13 & 14 and Column's C13 & C14 (Al
Grouting for Stone Cladding of Boundary wall (Inner Side) at Span 11 & 12 and Column's C11 & C12 (Al
Grouting for Stone Cladding of Boundary wall (Inner Side) at Span 9 & 10 and Column's C08, C09 & C10
1st Coat Damp proofing for Footings & Neck Column's of Pargola Foundations, at Grid (G & P/3, 4 &
Inspection & Compaction tests of 6th Layer Backfilling (Sub-Grade) (Out of 9 layers), for Foundation
Inspection & Compaction tests of 4th (Final) Layer Backfilling (Sub-Grade) (Out of 4 layers), for Foun
Base Seal and Extrusion Aluminum Installation between Axis 02, AL-02, AM.
Base Seal and Extrusion Aluminum Installation between Axis 02, AO-02, AP.
Base Seal and Extrusion Aluminum Installation between Axis 02, AN-02, AO.
Base Seal and Extrusion Aluminum Installation between Axis 02, AM-02, AN.
Installation of straight EMT Conduit (Dia. 20mm) & Boxes for Power System (Fused Connection) at t
Installation of Cable Tray for Emergency (CT25-100mm from grid no. 16F to 16Q) at the Management
Installation of UPVC Conduit Sleeve (Dia. 110mm) Low Current Ductbank no. D-LC-PC/64 Passing the In
Installation of Cable Tray and Trunking for Low Current (LC5- 600mm grid no.15/F to 15P,15P to 1
Installation of straight PVC Conduit (Dia. 25mm) and Boxes for Fire Alarm (Speaker, Break Glass, Door
Installation of straight PVC Conduit (Dia. 25mm) and Boxes for Voice and Data (WIFI, CAM, DC5) at th
Installation of straight PVC Conduit (Dia. 25mm) and Boxes for Security System (CAM, Door Controller
Installation of straight UPVC Conduit (Dia.25mm) and Box for Voice and Data (WIFI) at Buttress Axis
Installation of straight UPVC Conduit (Dia.25mm) and Box for Fire Alarm (Speaker) at Buttress Axis
Installation of straight UPVC Conduit (Dia.25mm) and Box for Voice and Data (WIFI) at Infill Wall A
Installation of straight UPVC Conduit (Dia.25mm) and Box for Fire Alarm (Speaker) at Infill Wall Ax
Inspection Of Pipe Installation For Non-Potable Water (Irrigation Line ); (200mmØ- UPVC-Claas-5 );
Installation of Water Feature Pvddle Flanges; (315&250&200&160mmØ UPVC CLASS 5) ; For wet well
HDPE Pipe Installation of Water Features pipes; (110mmØ SDR11-PE100); As per High lighted Attac
Inspection of Concrete Pouring for Canopy Column Neck of Seating Area (1) Zone-G (SA-11) - As Highlig
"Inspection of Formwork for Canopy Column Neck of Seating Area (1) Zone-G (SA-11) - As Highlighted"
"Inspection for Installation of Fire & Security Line Pit - B/FS/31, B/FS/15, B/FS/06 G/FS/37, G/FS/47, G/
"Inspection for Installation of Telecommunication Line Pit - B/TL/32, B/TL/10, B/TL/12, B/TL/13, B
Inspection of Excavation for Heating and Chilled Water Line at Zone-G including Pit G/DH/04 - As highlig
"Inspection and Compaction Test for backfilling sub-grade 1st Layer (1 of 4) for the Duct Bank of MV L
Inspection of Sand Covering to protect the pipe for Non-Potable Water Line at Zone- K - as highlighted
Inspection for Blinding Concrete under MV Line Pit B/MV/10, G/MV/19, G/MV/31, G/MV/27, G/MV/03,
Inspection of Concrete Pouring for the Upstand of SBC-04 (As Highlighted)
Inspection of Formwork for the Upstand of SBC-04 (As Highlighted)
Installation of Anchor Bolts and Check Co-ordinates and Levels for Canopy Foundation for Seating Area-1
Preliminary Inspection of Erected Steel in Crescent 02, Zone 6 2E from Axis 02N to 02R
Preliminary Inspection of Erected Steel in Crescent 02, Zone 6 2F from Axis 02AR to 02AS
Preliminary Inspection of Erected Steel in Crescent 02, Zone 4 2J from Axis 02AE to 02AB
Preliminary Inspection of Erected Steel in Crescent 02, Zone 4 2K from Axis 02AH to 02AE
Level and Location for Promenade Bridge Abutment wall kicker at Grid 02/C (as highlighted)
Level and Location for (MCPE 1) (8)-Isolated Column at Zone 2M 2N (as highlighted) axis 03R, 03-3, 03-2
Shuttering for (MCPE 1) (8)-Isolated Column at Zone 2M 2N (as highlighted) axis 03R, 03-3, 03-2
Steel Reinforcements for Infill wall between (02/L & 02/M) (As highlighted) ZONE 2D
Two layer of 4mm thicjk modified bituminous waterproofing membrane for MCPE 3 wall and foundation i
Surface preparation and Solvent base primer Under Strip Footing between PC 13-15 (as highlighted) Zo
Shuttering for Infill wall axis ( 01U to 01T, 01U to 01V ) (As highlighted) ZONE 1G
Steel Reinforcements for Infill wall between PC 96-97 inner between Gridline 02AD- 02AE (As highlight
Steel Reinforcements for Infill wall between PC 74-75 inner between Gridline 02M- 02N (As highlighted
Shuttering for Cafeteria Wall 33, 34, 35 Zone 2A Elev. 869.100 (as highlighted) (undercroft)
Steel Reinforcements and Shear Connector for RING BEAM Zone 2R (OUTER) Axis 02-2, 02AZ to 02BC (
Steel Reinforcements for Large Mosque Ground floor Columns At Axis C1-2 & E-5.1 As highlghted
Shuttering for 1st layer Mass Concrete of Central Bridge Foundation (as highlighted) Zone 4 Grid 1M
Level and Location for Infill wall axis ( 01U to 01T, 01U to 01V ) (As highlighted) ZONE 1G
Level and Location for Cafeteria Wall 33, 34, 35 Zone 2A Elev. 869.100 (as highlighted) (undercroft)
Level, Location of 1st layer Mass Concrete of Central Bridge Foundation (as highlighted) Zone 4 Grid 1M
Completion of Stacked Boulders with Grouting for All Layers at Bottom left side of Geyser Garden, in
Completion of Stacked Boulders with Grouting for All Layers at Between Waterplay garden & Aviary G
Completion of Stacked Boulders with Grouting for All Layers at Bottom side of Planted bed 1, inside
Concrete Pouring & Shuttering for Columns C74 & C75 of Boundary wall, As per Attached Highlight
Concrete Pouring & Shuttering for Roof Slab of Plant room at Maze Garden, at highlighted area in att
Coordinates & Levels of Columns C74 & C75 of Boundary wall, As per Attached Highlighted Drawing
Coordinates & Levels of Roof Slab for Plant room at Maze Garden, at highlighted area in attached dra
Inspection & Compaction tests of 2nd Layer (Sub-Grade) Backfilling (Out of 4 layers) for water featu
Inspection & Compaction tests of 3rd Layer (Sub-Grade) Backfilling (Out of 5 layers) for water featur
Inspection & Compaction tests of 3rd Layer (Sub-Grade) Backfilling (Out of 6 layers) for water featu
Inspection & Compaction tests of 3rd Layer Backfilling (Out of 5 layers Sub-Grade and final layer Sub
Excavation & Soil Preparation for Foundation of Boundary Wall @ Grid (0-4A/A-C & 6-12B/A), at Energ
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 2 layers) for Sub surfa
Inspection of Installed Low Current Handholes of Telecom (MH/ZG/TC/06 & 08) inside Maze garden, as
Excavation & Soil Preparation for Foundation of Boundary Wall @ Grid (4-15/L, 15/L-R & 15-16/R), at
Preliminary Inspection of Erected Steel in Crescent 02, Zone 4 2L from Axis 02AL to 02AH as per the h
Bolt Tightening Inspection of Aviary Garden from Grid Line 01 to 23.
Surface Prepatio prior to start back filling around Manhole - FW10 at Zone B - as highlighted
Excavation for Fire Water Line at Zone-L - as highlighted
Excavation for Potable Water Line at Zone-L - as highlighted
Surface Prepatio prior to start back filling around Non-Potable water line Pit - NPW-ISC-08 at Zone B - as
"Inspection and Compacton Test for backfilling Sub-grade 10th Layer (Final) (10 of 10) around SBC-06 (W
Inspection of Sand Bedding under pipe for Non-Potable Water Line near Plaza Area at Zone C - as highlig
Inspection and Compaction Test for backfilling sub-grade 1st Layer (1 of 7) around Fire Water Line Pit f
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 7) around Potable Water Line
Inspection and Compacton Test for backfilling Sub-grade 6th Layer (6 of 8) around SBC-08 (Wing Wall) - R
Inspection for Installation of MV Line Junction Pit - B/MV/02, H/MV/08, L/MV/06 - as highlighted
Inspection and compaction test 4th layer for backfilling of MCPE 1 axis 02/AN to 02/AP (as highlighted
Inspection and Compaction Test for backfilling Sub-grade 2nd Laye (2 of 2) above Sand Covering for Pot
Preliminary Inspection of Erected Steel in Crescent 02, Zone 6 2H from Axis 02AB to 02Z
Bolt Tightening Inspection of Crescent 02, Zone 4 - 2L from Axis 02AL to 02AH
Pre-Assembly Bolt Tightening Inspection of Crescent 02, Zone 5 - 2H, Axis 02Y
Pre-Assembly Bolt Tightening Inspection of Crescent 02, Zone 6 - 2F, Axis 02S
Level, Location & Excavation for CENTRAL BRIDGE ABUTMENT Zone 4 (as highlighted) axis 02AG - 02AH
Shuttering for MCPE 2 wall (inner) at axis 03E TO 02X & 02Y-02Z As highlighted
Concreting for MCPE 2 wall (inner) at axis 02Y-02Z As highlighted
Level and Location for MCPE 2 wall (inner) at axis 03E-02X & 02Y-02Z As highlighted
Surface Preparation Prior to start Backfilling between PC 77 & 79 Zone 1N (as highlighted)
Level and Location for strip footing between PC between PC( 126-128 )inner Zone 2F (as highlighted)
Steel Reinforcements for Isolated Circular Columns (C5 )for CAFETERIA (as highlighted) ZONE 2A
Level and Location for Isolated Circular Columns (C5 )for CAFETERIA (as highlighted) ZONE 2A
"Inspection for Installation of Fire Water Line Isolation Pit K/F/08 at Zone - G - as highlighted "
Shuttering for Isolated Circular Columns (C5 )for CAFETERIA (as highlighted) ZONE 2A
Excavation for Non-Potable Water Line near Plaza Area at Zone C - as highlighted
Inspection for Blinding Concrete under MV Line Pit B/MV/23, F/MV/08, G/MV/21, G/MV/28 - as highligh
Inspection of Concrete Pouring for the Footing of SBC-08 - Wing Wall (Right Side) - As Highlighted
Shuttering and Shear Connector for BUTTRESS (with Beam) BOI 49 Zone 1M
Concreting for BUTTRESS (with Beam) BOI 49 Zone 1M
Level and Location for BUTTRESS (with Beam) BOI 49 Zone 1M
Inspection and compaction test 10th layer Backfill for MCPE 1 Inner wall at Zone 2M 2N Axis 03R - 03T (
Protection layer of Geotex and 50mm Screed above foundation of retaining wall [inner] axis 01AI to 01A
Level and Location for Diaphragm Wall axis 02R (2nd Section as highlighted) level 874.1 to 877 Zone 2N
Shuttering for Diaphragm Wall axis 02R (2nd Section as highlighted) level 874.1 to 877 Zone 2N
Concreting for Diaphragm Wall axis 02R (2nd Section as highlighted) level 874.1 to 877 Zone 2N
Installation of Sleeve Pipes (UPVC Pipes Class 4, 63mmØ) for irrigation lateral pipeline (L=15.2 M).
Installation of Sleeve Pipes (UPVC Pipes Class 4, 63mmØ) for irrigation lateral pipeline (L=15.2 M).
Grouting for Stacked Boulders All Layers at left side of Water paly Garden, Inside Water Garden, At H
Grouting for Stacked Boulders All Layers at left side of Planted bed 1 & 2, inside Water paly Garden,
Grouting for Stacked Boulders All Layers along Aviary Garden from inside Water paly Garden, at Wate
Soil preparation Prior to Backfilling @ Grid (0-11B/A-R), inside Energy Center 2, as highlighted area i
Inspection & Compaction tests of 1st Layer (Sub-Grade) Backfilling (Out of 4 layers) for water featur
Installation of Sleeve Pipes (UPVC Pipes Class 4, 63mmØ) for irrigation lateral pipeline (L=15.2 M).
MOCK UP of FIRST FIX water supply (copper pipes 1/2") with rubber insulation tube as per approved m
300 mm Gravel 3/8" Backfilling and Geotextile for Storm Water Line- Outfall X & Outfull-B for (450mm
Pipe Installation of Storm Water Line OutFall-A for (315mmØ-UPVC- Class-4 ) from (MH-A-11 & MH-A-
300 mm Gravel 3/8" Backfilling and Geotextile for Storm Water Line Outfall-A for (315mmØ-UPVC- C
Single layer of 4mm thick modified bituminous waterproofing membrane Under Strip Footing between
Protection layer of 4mm thick bituminous protection board for TUNNEL wall part C Zone 2H (as Highlig
Protection layer of Geotex and 50mmScreed Under Strip Footing between PC 16-18 (as highlighted) Zo
Steel Reinforcements for walls(W3 ,W4,W5) at CAFETERIA zone 2A (as highlighted)
Single layer of 4mm thick modified bituminous waterproofing membrane Under Strip Footing between P
Surface Preparation and Solvent Base Primer for TUNNEL 2 Wall shaft (outer) Zone 2F (as highlihgted) ax
Surface preparation and Solvent base primer Under Strip Footing between PC 20-22 (as highlighted) Zo
Steel Reinforcements for Diaphragm Wall axis 02R (2nd Section as highlighted) level 874.1 to 876 Zone
Steel Reinforcements of Internal Buildings foundation RF3, RF12 Zone 1N & 1P (as highlighted)
Shuttering of Internal Buildings foundation RF3, RF12 Zone 1N & 1P (as highlighted)
Concreting of Internal Buildings foundation RF3, RF12 Zone 1N & 1P (as highlighted)
Steel Reinforcements for MCPE 1 Columns (C7 & C8) at Ground Floor axis 03R Zone 2M 2N (as highlighte
Shuttering for Tunnel 1 wall part-C (2nd) (as Highlighted) Zone 2H outer wall
Concreting for Tunnel 1 wall part-C (2nd) (as Highlighted) Zone 2H outer wall
Two Layers of 4mm thick modified bituminous waterproofing membrane for TUNNEL wall part C Zone 2H
Excavation for strip footing between PC( 132-134 )& between PC( 126-128 )inner Zone 2F (as highlighte
"Notification to start excavation works for cretaceous garden zone 2D,2E (as highlighted)"
Surface Preparation Prior to start Backfilling PC between PC 80 to 79 Zone 1N (as highlighted)
Excavation for strip footing inner zone 2K (as highlighted)
Inspection and compaction test 2nd & 3rd layer for backfilling at TIP Zone 1A(as highlighted) (2nd & 3rd
Inspection and compaction test 3rd layer for backfilling of MCPE 1 axis 02/AN to 02/AP (as highlighted
Inspection and compaction test 2nd layer for backfilling of MCPE 1 axis 02/AN to 02/AP (as highlighte
Inspection and compaction test 9th layer Backfill for MCPE 1 Inner wall at Zone 2M 2N Axis 03R - 03T (a
Inspection and compaction test 8th layer Backfill for MCPE 1 Inner wall at Zone 2M 2N Axis 03R - 03T (a
Level and Location for Internal Buildings foundation RF3, RF12 Zone 1N & 1P (as highlighted)
Level and Location for Tunnel 1 wall part-C (2nd) (as Highlighted) Zone 2H outer wall
Level and Location for Infill wall (1st stage) between Butress inner 72-73 between Gridline 2K - 2L (As
Level and Location two interior columns inside Large Mosque at grid (B,3 - B,4) ZONE 1G (as highlighetd
LEVEL and LOCATION for Isolated Circular Columns (C4, C7 )for CAFETERIA (as highlighted) ZONE 2A
Level and Location for Large Mosque Shaft, Electricity Box and Grade Beam for Ground floor Slab (as highl
Inspection of Installation, Alignment and Bolt Tightening for the Metal Cladding in Crescent 02 Zone 7
Pre-Assembly Bolt Tightening Inspection of Crescent 02, Zone 5 - 2H, Axis 02AB, 02AA & 02Z
Inspection of Installation, Alignment and Bolt Tightening for the Metal Cladding in Crescent 02 Zone 6
Inspection of Installation and Alignment for the Crescent 02 Zone 6 - 2D, From Axis 02J to 02N
Inspection of Installation, Alignment and Bolt Tightening for the Metal Cladding in Crescent 02 Zone 2
Inspection of Installation, Alignment & Bolt Tightening for the Metal Cladding in Crescent 02 Zone 2 -
Inspection of Installation and Alignment for the Crescent 02 Zone 7 - 2B & 2C, From Axis 02D to 02J
Inspection of Installation, Alignment & Bolt Tightening for the Metal Cladding in Crescent 02 Zone 3 -
Inspection of Installation, Alignment & Bolt Tightening for the Metal Cladding in Crescent 02 Zone 3 -
Weld Visual & NDT Inspection for the Baseplate Washer Plates in Crescent 02, Zone 4 2L
Installation of Cable Tray for Low Voltage (CT6-100mm from grid no. 16G to 16Q) at the Management
Installation of straight UPVC Conduit (Dia.32mm) for Power(Socket Outlet) at Crescent-01 Buttress Ax
Installation of straight UPVC Conduit (Dia.32mm) for Power(Socket Outlet) at Crescent-02 Infill Wall
'Warning Tape Installation of Potable Water Pipe for (110mmØ-UPVC-Class-5). As per highlighted Are
HDPE Pipe Installation of Water Features pipes; (63 &110mmØ SDR11-PE100); As per High lighted A
HDPE Pipe Installation of Water Features pipes; (dia250mm SDR11-PE100); As per High lighted Atta
Installation of Main Fire Water Pipes (200&160mmØ-UPVC-Class-5) From Pit (F/F/01) to Pit (F/F/10)
Installation of Main Potable Water Pipes (160&75mmØ-UPVC-Class-5) at Zone F- From Pit - F/PW/01 t
Application of Primer for Water proofing of wet area (Shower) , At Management Building as highl
Grouting for Stone Cladding of Boundary wall (Inner Side) at Span 25 & 26 and Column's C24A, C25 & C
Protection Layer 4mm thk Bituminous Protection Board on Water Proofing on Foundations and Walls (inn
Single layer 4mm thk Modified Bituminous Water Proofing Membrane on Foundations and Walls (inner s
Primer Coating prior to Damp proofing for Footings & Neck Column's of Pargola Foundations, at Gri
Surface preparation prior to Damp proof Water proofing for Footings & Neck Column's of Pargola Fo
Inspection & Compaction tests of 2nd Layer (Sub-Grade) Backfilling (Out of 5 layers) for water featu
Inspection & Compaction tests of 2nd Layer (Sub-Grade) Backfilling (Out of 6 layers) for water featu
Inspection & Compaction tests of 2nd Layer Backfilling (Out of 5 layers Sub-Grade and final layer Sub
Inspection & Compaction tests of 5th Layer Backfilling (Sub-Grade) (Out of 9 layers), for Foundation
Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Grade) (Out of 9 layers), for Foundation
Inspection and Compacton Test for backfilling Sub-grade 5th Layer (5 of 8) around SBC-08 (Wing Wall) - R
Inspection of Sand bedding under pipe for Fire & Security Distribution Line from H-FS-18 to H-FS-24 at
Inspection of Sand bedding under pipe for Telecommunication Line from H/TL/17 to H/TL/20 at Zone-H a
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 4) above Sand Covering for No
Inspection of Sand Covering to protect the pipe for Non-Potable Water Line at Zone- K - as highlighted
Inspection for Installation of MV Line Junction Pit - B/MV/12, G/MV/11, L/MV/08 - as highlighted
"INSPECTION FOR INSTALLATION OF ALL RINGS (RISER) AND SLAB FOR MH-M-06 (As Highlighted) "
INSPECTION FOR MANHOLE BASE INSTALLATION AND UPVC PIPE CONNECTION FOR - MH-M-04, MH-M-06
Excavation for MV Line Pit H/MV/07, L/MV/03 - as highlighted
Inspection for Installation of Non-Potable Water Line Isolation Pit for NPW-ISC-02, NPW-ISC-03, NPW
Installation of PVC Conduit (Dia. 25mm) & Boxes for Power System (Fused Connection, Socket Outlet,
Installation of straight UPVC Conduit Sleeve (Dia. 75mm) LV (Small Power & Normal Lighting) & EM (
Installation of PVC Conduit (Dia. 75mm) and Junction Box for LC System at the New Ticket Booth No. (
Installation of PVC Conduit (Dia. 25mm) and Box for Voice and Data System (DATA, CAM & Telephone)
Installation of PVC Conduit (Dia. 25mm) and Box for Security System (CAM, Door Controller, Magnetic
Installation of PVC Conduit (Dia. 25mm) and Box for Fire Alarm System (Break Glass) at the New Ticke
'Potable Water Pipes Sand Cover & Pipes Protection (30 cm above Pipes). As per highlighted Area in
'Fire Fighting Networks Sand Cover & Pipes Protection (30 cm above Pipes). As per highlighted Area
Inspection and Compacton Test for backfilling Sub-grade 9th Layer (9 of 10) around SBC-06 (Wing Wall) -
Inspection and Compacton Test for backfilling Sub-grade 4th Layer (4 of 8) around SBC-08 (Wing Wall) - R
Inspection of Sand Covering to protect the pipe for Non-Potable Water Line at Zone- K - as highlighted
Inspection and Compaction Test for backfilling Sub-grade 1st Laye (1 of 4) above Sand Covering for Non
Inspection of Sand Bedding under pipe for MV Line from C/MV/29 TO C/MV/01 at Zone- - as highlighted
Surface Preparation prior to start backfilling sub-grade for the Duct Bank of MV Line from C/MV/40 to
Inspection of Water Proofing for the Duct Bank of MV Line from C/MV/40 to C/MV/23 at Zone- C (As Hig
Surface Preparation prior to start Water Proofing for the Duct Bank of MV Line from C/MV/40 to C/MV/2
Inspection and Compaction Test for backfilling Sub-grade 1st Laye (1 of 2) above Sand Covering for Pot
Two Layer of 4mm thick modified bituminous waterproofing membrane for MCPE 1 Wall (as highlighted)
Surface Preparation prior to start backfilling around Fire Water Line Pit for C/F/11, C/F/12, C/F/13 as hig
Surface Preparation prior to start backfilling around Potable Water Line Pit for C/PW/05, C/PW/08 as hig
Inspection and Compacton Test for backfilling Sub-grade 8th Layer (8 of 10) around SBC-06 (Wing Wall) -
Inspection for Blinding Concrete under MV Line Pit H/MV/07, H/MV/08, L/MV/03, L/MV/06 - as highligh
Inspection for Installation of MV Line Junction Pit - C/MV/12, G/MV/10, H/MV/05 - as highlighted
Inspection and Compacton Test for backfilling Sub-grade 3rd Layer (3 of 8) around SBC-08 (Wing Wall) - R
Excavation for MV Line Pit H/MV/07, H/MV/08, L/MV/03, L/MV/06 - as highlighted
Inspection of Sand Covering to protect the pipe for Non-Potable Water Line at Zone- K - as highlighted
Inspection of Sand bedding under pipe for Fire & Security Distribution Line from B/FS/15 to B/FS/17 at
Inspection of Sand bedding under pipe for Telecommunication Line between B/TL/12 to B/TL/15 at Zone
Inspection of Sand Bedding under pipe for Non-Potable Water Line at Zone G - as highlighted (Stock Pile
Excavation for MV Line from C/MV/29 TO C/MV/01 at Zone- - as highlighted in the attached drawing
Inspection and Compaction Test for 1st Layer (1 of 4) backfilling (grading) at Zone - C&H (Near Crescent
Concreting for Bridge to south tower abutments wall foundation at grid 02C Zone 7 (as highlighted)
Soil Preparation prior to start Cutting and Backfill (-40cm from FGL) at Zone - C & H (Near Crescent) as h
Concreting for Promenade Bridge Abutment RETAINING wall at Grid 1P (as highlighted)
Screed Protection 50mm thick above foundation of retaining wall [inner] axis 01AI to 01AB (as highligh
Steel Reinforcements for Ground Beam between PC 80-82 Zone 1N (as highlighted) SCR-0175 & ATTA
Concreting for two interrior columns insaide Large Mosque at grid (B,3 - B,4) ZONE 1G (as highlighetd)
Solvent Base Primer Coating Prior to Membrane Water proofing on Foundations and Walls (inner sides)
Shuttering for Isolated Circular Columns (C4, C7 )for CAFETERIA (as highlighted) ZONE 2A
Shuttering for Infill wall (1st stage) between Butress inner 72-73 between Gridline 2K - 2L (As highlight
Protection Layer 4mm thk Bituminous Protection Board on Water Proofing on Columns & Walls Sides (F
Concreting for RING BEAM Zone 1J (INNER) Axis 01-1, 01AA to 011D (as highlighted)
Concreting for Isolated Columns for south Small MOSQUE (as highlighted) elev. 873.15 ZONE 2B, Axis B2,
Steel Reinforcements for MCPE 2 Counter fort (inner) at axis 02Y to 02Z As highlighted
Primer Coating Prior to Damp proofing for Footing & Kicker of (Existing) Boundary wall (Outer Side), at
Surface Preparation Prior to Water proofing for Footing & Kicker of (Existing) Boundary wall (Outer Sid
Steel Reinforcement for walls of New Ticketing Booth # 3A, As per Attached Highlighted Drawing's.
Shuttering for two interrior columns insaide Large Mosque at grid (B,3 - B,4) ZONE 1G (as highlighetd)
Concrete Pouring & Shuttering for Wall & Columns of Boundary wall (Upto T.O.W) Span 74 & 75, As
Surface preparation & Base primer coating for TUNNEL wall part C Zone 2H (as Highlighted)
Surface preparation & Base primer coating for MCPE 3 wall and foundation inner Grid (03/1, 03/A to 02/
Coordinates & Levels of Wall & Columns of Boundary wall (Upto T.O.W) Span 74 & 75, As per Attach
Steel Reinforcements for undercroft Wall 10, 13, 14, 15, 19 of Cafeteria Zone 2A (as highlighted)
Protection layer of Geotex and 50mmScreed under diaphragm wall foundation Zone 2N (as Highlighted
Stack Boulders Installed Layers at levels +872.40, 872.80, 873.20, 873.60, 874.00, 874.40, 874.80, 8
NOTIFACTION TO START REMOVING THE 2ND STAGE SUBSTATIONS (R1, R2, R5,R6, R7, R8, R9, R10, R1
Installation of UPVC Conduit Sleeve (Dia. 110mm) Low Current (ICT) Ductbank (between Axis 02/2K &
Installation of straight UPVC Conduit (Dia. 25mm) and Boxes for Security System (CAM) at the Cafeter
Installation of straight UPVC Conduit (Dia. 25mm) and Boxes for Fire Alarm (Speaker) at the Cafeteri
Installation of straight UPVC Conduit (Dia. 25mm) and Boxes for Voice and Data (WIFI & CAM) at the
Installation of straight PVC Conduit (Dia.25mm) and Box for Fire Alarm (Break Glass) at Public Toilets
Installation of straight PVC Conduit (Dia.25mm) and Box for Voice and Data (Telephone) at Public Toi
Installation of straight PVC Conduit (Dia. 20mm) and Boxes for Fire Alarm (Break Glass) at Site Tower
Installation of straight PVC Conduit (Dia. 20mm) and Boxes for Security (CAM) at Site Tower No. 2 as
Installation of straight PVC Conduit (Dia. 20mm) and Boxes for Voice and Data (CAM) at Site Tower N
Installation of straight UPVC Conduit (5x160mm) Medium Voltage Ductbank no. CC/D-MV/05 (from M
Installation of PVC Conduit for Lighting (LED C6 & LED C13) at the South Small Mosque (between Col
Installation of straight UPVC Conduit (5x160mm) Medium Voltage Ductbank no. BC/D-MV/02 (from
Concrete pouring for Blinding under Electrical Handholes of Emergency (MH/WG/EM/28 to 25), (MH/W
3rd Coat Cementitious Water proofing for Footings top & Walls of Seat Walls (Outer) (Remaining Parts)
2nd Coat Cementitious Water proofing for Footings top & Walls of Seat Walls (Outer) (Remaining Parts)
Steel Reinforcement for Roof Slab and Parapet walls, at Grid (G-F/8) at Management Building as highl
Protection layer 4mm thk Bituminous Protection board on Damp proofing for Footings & Walls of Seat W
Concrete Pouring & Shuttering for Roof Slab of Plant Room, at Physic Garden, at highlighted area i
Inspection & Compaction tests of 4th Layer Backfilling (Sub-Grade) (Out of 9 layers), for Foundation
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 9 layers), for Foundation
Inspection & Compaction tests of 1st Layer Backfilling (Out of 5 layers Sub-Grade and final layer Sub B
Inspection & Compaction tests of 1st Layer (Sub-Grade) Backfilling (Out of 5 layers) for water featur
Inspection & Compaction tests of 1st Layer (Sub-Grade) Backfilling (Out of 6 layers) for water featu
Sand Cover & Pipe Protection for water feature lines (part 5) (HDPE dia 160 mm) from Centre of Geys
Level and Location for MCPE 3 Columns (C17 - C18 - C19 - C20 - C21) at Ground Floor axis 02R to 02S, 03
Installation and Survey Report for Location and Levels of Anchor Bolts for RING BEAM Zone 1K 2nd (OU
Surface Preparation Prior to start Backfilling at TIP ZONE 1A (as highlighted)
Surface Preparation Prior to start Backfilling at MCPE 1 Zone 2N 2M axis 02/AN to 02/AP (as highlighted
Inspection and compaction test 1st layer for backfilling of MCPE 1 axis 02/AN to 02/AP (as highlighted)
Protection layer of 4mm thick bituminous protectionn board under Foundation of Diaphragm Wall at ax
Steel Reinforcements for two interrior columns insaide Large Mosque at grid (B,3 - B,4) ZONE 1G (as hig
Steel Reinforcements for slab on grade inside the large mosque, electricity box and grid beam for Large
Concreting for RING BEAM Zone 2G (OUTER) Axis 02-2, 02V to 02Y (as highlighted)
Protection layer of 4mm thick bituminous protection borad for MCPE 1 Wall inner with counter fort (a
Protection layer of 4mm thick bituminous protection borad for MCPE 1 Wall outer (as highlighted) Zon
Steel Reinforcements for Infill wall beside Butress inner 25 & 26 between Gridline 01S-01T (As highligh
Concreting for walls for south Small MOSQUE Axis (C,1-2, 1,C-G, G,1-3, F,3-4 & 5-6, 6,F-G, G,6-8 ) (as hi
Concreting for Isolated Circular Columns ( C1, C2 ) for CAFETERIA (as highlighted) elev. 869.10 ZONE 2A
Concreting for Cafeteria Circular Column C-03, 06 Zone 2A Elev. 869.100 (as highlighted)
Concreting for 2 blinding for Foundation of Internal Buildings Zone 1N & 1P (as highlighted)
Steel Reinforcements for External Wall for south Small MOSQUE (as highlighted) elev. 873.15 ZONE 2B, Axi
Shuttering for MCPE 3 Columns (C17 - C18 - C19 - C20 - C21) at Ground Floor axis 02R to 02S, 03-2 Zone
Concreting for MCPE 3 Columns (C17 - C18 - C19 - C20 - C21) at Ground Floor axis 02R to 02S, 03-2 Zone
Concreting for Blinding of VIP Auditorium strip footing at Zone 1H axis B-VA, C-VA, D-VA (as highlighted)
Concreting for Blinding of VIP Auditorium strip footing at Zone 1H axis E-VA, F-VA, D-E-VA, G-VA, 7-VA (a
Installation For Tents for Aviary - PTFE 1150 .As per High lighted Attached Approved Shop Drawing.
Steel Structures For Outer roofs & Centre roof
HDPE Pipe Installation of Water Features pipes; (160mm SDR11-PE100); As per High lighted Attache
Inspection Of Pipe Installation For Non-Potable Water (Irrigation Line ); (200mmØ- UPVC-Claas-5 );
"Inspection of Grouting (Horizontal Joints) for Rock Boulder - RB-141 for All Layers"
"Inspection of Grouting (Vertical Joints) for Rock Boulder - RB-141 for All Layers"
Inspection of Grouting (Horizontal & Vertical) for Stone Boulder in Wadi-1, Left Side (RB-166) for Layer'
Inspection of Grouting (Horizontal & Vertical) for Stone Boulder in Wadi-1, Right Side (RB-167) for Layer
Inspection of Grouting (Horizontal & vertical) for Stone Boulder in Wadi-2, Right Side (RB-140) for Layer'
Inspection of Grouting (Horizontal & Vertical) for Stone Boulder in Wadi-2 Left Side (RB-139) for Layer
"Inspection for Casting the Blinding Concrete under the Manhole for FW-A-6 (as Highlighted)"
Inspection for Casting Blinding Concrete under Manhole - MH-M-04, MH-M-06 - as highlighted
Inspection for Blinding Concrete under MV Line Pit B/MV/12, B/MV/02 - as highlighted
Inspection of Sand Bedding under pipe for Non-Potable Water Line at Zone G - as highlighted (Stock Pile
Inspection and Compacton Test for backfilling Sub-grade 2nd Layer (2 of 8) around SBC-08 (Wing Wall) -
Inspection and Compacton Test for backfilling Sub-grade 7th Layer (7 of 8) around SBC-06 (Wing Wall) -
Excavation for Fire & Security Distribution Line from H/FS/18 to H/FS/24 Including Pit H/FS/18, H/FS/24
Excavation for Telecommunication Line from H/TL/17 to H/TL/20 including pit H/TL/17, H/TL/20 at Zone
Inspection of Sand Covering to protect the pipe for Non-Potable Water Line at Zone- K - as highlighted
Inspection of Installation and alignment for the Butterfly Garden from Axis 1 to 21.
Bolt Tightening Inspection of Crescent 01, Zone 3 - 1E from Axis 01M to 01P
Pre-Assembly Bolt Tightening Inspection of Crescent 02, Zone 6 - 2F, Axis 02R
Pre-Assembly Bolt Tightening Inspection of Crescent 02, Zone 6 - 2E, from Axis 02P to 02R
Weld Visual & NDT Inspection for the Crescent 02, Zone 6 - 2E, from Axis 02P to 02R
Weld Visual & NDT Inspection for the Crescent 02, Zone 6 - 2F, Axis 02R & 02S
Inspection of Installation and Alignment for the Crescent 02, Zone 4 2L, from Axis 2AL to 2AH.
Surface Preparation and Paint Touch Up Inspection in Crescent 01 Zone 3, 1E from Axis 01M to 01P.
Installation and Survey Report for Location and Levels of Anchor Bolts for RING BEAM Zone 1K (OUTER)
Concreting for Large Mosque Shaft for Ground floor Slab (as highlighted) axis 1, 2, C-C-1
Shuttering for Large Mosque Shaft for Ground floor Slab (as highlighted) axis 1, 2, C-C-1
Anti Termite application under Blinding of SLAB ON GRADE OF LARGE MOSQUE at Zone 1G (as highlighted
Shuttering for Blinding of SLAB ON GRADE OF LARGE MOSQUE at Zone 1G (as highlighted) (5th) axis C1-F
Concreting for Blinding of SLAB ON GRADE OF LARGE MOSQUE at Zone 1G (as highlighted) (5th) axis C1-F
Shuttering and Scaffoldings for RING BEAM Zone 1K (2ND OUTER) Axis 01-2, 01AF to 01AG (as highlighte
Steel Reinforcements for Infill wall between Butress inner 72-73 between Gridline 2K - 2L (As highlight
Steel Reinforcements and Shear Connector for RING BEAM Zone 1K (2ND OUTER) Axis 01-2, 01AF to 01
Concreting for Buttress with Beam BOI 48 Zone 1M (as highlighted)
Steel reinforcements for Buttress with Beam BOI BOV BII BIV 54, 55 Zone 1N 1P (as highlighted)
Shuttering and Shear Connector for Buttress with Beam BOI 48 Zone 1M (as highlighted)
Shuttering for Retaining Wall Kicker Promenade Bridge Abutment at Grid M Zone 4 as highlighted
Concreting for Retaining Wall Kicker Promenade Bridge Abutment at Grid M Zone 4 as highlighted
Single layer of 4mm thock modified bituminous water proofing membrane under Foundation of Diaphra
Shuttering for Cafeteria Circular Column C-03, 06 Zone 2A Elev. 869.100 (as highlighted)
Shuttering for Infill wall axis ( 01U to 01T ) (As highlighted) ZONE 1G
Inspection of Concrete (Plain) Pouring for the Duct Bank of MV Line between H/MV/10 to H/MV/05 at Z
Inspection of Concrete (Plain) Pouring for the Duct Bank of MV Line from H/MV/11 to H/MV/10 at Zone-
Inspection and Compacton Test for backfilling Sub-grade 1st Layer (1 of 8) around SBC-08 (Wing Wall) - R
Inspection and Compacton Test for backfilling Sub-grade 6th Layer (6 of 8) around SBC-06 (Wing Wall) -
Anti Termite application under South Watch Tower foundation at Zone 27 (as highlighted)
Excavation for Non-Potable Water Line at Zone G including POC-29, POC-30- as highlighted
Shuttering for Blinding under South Watch Tower foundation at Zone 27 (as highlighted)
'Potable Water Pipes Sand Cover & Pipes Protection (30 cm above Pipes). As per highlighted Area in
Sand Bedding for Water Feature Lines (HDPE dia 110 mm Supply) from water feature plant room upto i
Sand Bedding for Water Feature Lines (Main 110 dia & Sub 63mm 4 no's) from Plant room to Outer Cano
Inspection & Compaction tests of 8th (Final) Layer (Sub-Grade) Backfilling (Out of 8 layers) in Betwee
Concrete pouring and shutring of starter ( Kicker ) for Circular wall (Remaining part) inside Maze G
Steel Reinforcement for Roof Slab of Plant room at Maze Garden, at highlighted area in attached draw
Concrete Pouring for Blinding under Foundation of Seat Walls (Inner), Inside Physic Garden as highlig
Inspection for Window and Door openings for New Ticketing Booth # 3A As per Attached Highlighted
Coordinates & Levels for Blinding under Foundation of Seat Walls (Inner), Inside Physic Garden as hig
Level and Location for Blinding of SLAB ON GRADE OF LARGE MOSQUE at Zone 1G (as highlighted) (5th) a
Level and Location for RING BEAM Zone 1K (2ND OUTER) Axis 01-2, 01AF to 01AG (as highlighted)
Level and Location for Large Mosque Shaft for Ground floor Slab (as highlighted) axis 1, 2, C-C-1
Level and Location for Buttress with Beam BOI 48 Zone 1M (as highlighted)
Level and Location for Retaining Wall Kicker Promenade Bridge Abutment at Grid M Zone 4 as highlight
Level and Location for Cafeteria Circular Column C-03, 06 Zone 2A Elev. 869.100 (as highlighted)
Level, Location for Excavation for SOUTH WATCH TOWER FOUNDATION Zone 7 (as highlighted)
Level and Location for Infill wall axis ( 01U to 01T ) (As highlighted) ZONE 1G
Level, Location for Blinding under South Watch Tower foundation at Zone 27 (as highlighted)
Level and Location for MCPE 2 Counter fort & Wall (inner) at axis 02-X to 02Y As highlighted
Level and Location for Diaphragm Wall for Zone 2N grid 02/AR from level (870.5 to 874.1 ) (as highlight
Level, Location for MCPE 1 2-Isolated Foundation at Zone 2M 2N (as highlighted) axis 03-E, 03-2
Level and Location for Infill wall between Butress 71-72 between Gridline 2K - 2J (As highlighted) ZONE
Level and Location for RING BEAM Zone 1K (1ST OUTER) Axis 01-2, 01AD to 01AE (as highlighted)
Level and Location for Infill wall between BIV 107-108 between Gridline 02-1 AL - 02-1 AM (As highlig
Level and Location of Staircase & ground beam for Large Mosque ZONE 1G (as highlighetd) at grid (A-B,
Inspection and compaction test 5th layer Backfill for RETAINING WALL (as highlighted) axis 01K-01M Zon
Shuttering for MCPE 2 Counter fort & Wall (inner) at axis 02-X to 02Y As highlighted
Concreting for MCPE 2 Counter fort & Wall (inner) at axis 02-X to 02Y As highlighted
Inspection and compaction test 2nd layer (Subgrade) for backfilling for Devonian Garden Zone 2M ( 2nd l
Steel Reinforcements and Shear Connector for RING BEAM Zone 1K (1ST OUTER) Axis 01-2, 01AD to 01
Shuttering for Diaphragm Wall for Zone 2N grid 02/AR from level (870.5 to 874.1 ) (as highlighted) (seco
Steel Reinforcements for MCPE 1 2-Isolated Foundation at Zone 2M 2N (as highlighted) axis 03-E, 03-2
Shuttering for MCPE 1 2-Isolated Foundation at Zone 2M 2N (as highlighted) axis 03-E, 03-2
Concreting for MCPE 1 2-Isolated Foundation at Zone 2M 2N (as highlighted) axis 03-E, 03-2
Shuttering for Infill wall between Butress 71-72 between Gridline 2K - 2J (As highlighted) ZONE 2D
Shuttering and Scaffoldings for RING BEAM Zone 1K (1ST OUTER) Axis 01-2, 01AD to 01AE (as highlighte
Steel Reinforcements for MCPE 2 Inner wall Axis 02AH to 02AB at Zone 2G 2H 2J 2J (as highlighted)
Steel Reinforcements for Staircase & ground beam for Large Mosque ZONE 1G (as highlighetd) at grid (A-
Shuttering for Staircase & ground beam for Large Mosque ZONE 1G (as highlighetd) at grid (A-B, 3-5, C1-
Surface Preparation and Solvent Base Primer for MCPE 1 Wall outer (as highlighted) Zone 2N 2M, axis
Two layers of 4mm thick modified bituminous waterproofing membrane for MCPE 1 Wall outer (as high
Surface Preparation and Solvent Base Primer for MCPE 1 Wall inner with counter fort (as highlighted)
Two layers of 4mm thick modified bituminous waterproofing membrane for MCPE 1 Wall inner with coun
Surface Preparation and Solvent Base Primer for MCPE 1 Wall inner with counter fort (as highlighted)
Two layers of 4mm thick modified bituminous waterproofing membrane for MCPE 1 Wall inner with coun
Protection layer of 4mm thick bituminous protection board for MCPE 1 Wall inner with counter fort (a
Shuttering for Infill wall between BIV 107-108 between Gridline 02-1 AL - 02-1 AM (As highlighted) ZO
Repair of Cracks for foundation Slab of LARGE MOSQUE (as highlighted) Axis B-E, 2-5 ZONE 1G
Inspection of Spatter Dash (Rough Coat) for External Wall Elevation at Grid (10-12/Q), at Management
Plaster Guide Points & Accessories for Plastering of External Wall Elevation at Grid (10-12/Q), at Ma
Coordinates & Levels of Blinding for Boundary Wall @ Grid (M&R/21-28), at Energy Center 2, as highl
Steel Reinforcement for Wall & Columns of Boundary wall Span 74 & 75, As per Attached Highlight
Concrete Pouring for Blinding under Boundary Wall @ Grid (M&R/22-28), at Energy Center 2, as highl
Concreting for Infill wall between BIV 107-108 between Gridline 02-1 AL - 02-1 AM (As highlighted) ZO
Concreting for Ground Beam between PC 80-82 Zone 1N (as highlighted)
Steel Reinforcements for Large Mosque Shaft for Ground floor Slab (as highlighted) axis 1, 2, C-C-1
Excavation and Bed preparation for Water Feature Lines (HDPE dia 110 mm Supply) from water feature
Excavation and Bed preparation for water feature lines (part 7) (HDPE dia 250 mm, 2 no's) between
Sand Cover & Pipe Protection for water feature lines (part 6) (HDPE dia 250 mm) From entrance of Bo
Sand Cover & Pipe Protection for water feature lines (part 6 Branch) (HDPE dia 250 mm) Inside Geyse
Sand Cover and Pipe Protection for Water Feature Lines (110 dia) from Plant room to MH-D-01-A1-01,
Surface Preparation prior to Backfilling for area's of Jetty 1 & 2, at Boat Garden, inside Water Garden
Excavation & Bed preparation for Water Feature Lines (Main 110 dia & Sub 63mm 4 no's) from Plant ro
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 9 layers), for Foundation
Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Grade) (Out of 9 layers), for Foundation
Inspection and compaction test 1st layer (Subgrade) for backfilling for Devonian Garden Zone 2M ( 1st la
Level and Location for Ground Beam between PC 78-80 Zone 1N (as highlighted)
Level and Location for Tunnel 1 wall part-C (2nd) (as Highlighted) Zone 2H
Excavation for Fire & Security Distribution Line from B/FS/15 to B/FS/17 and B/FS/17 at Zone-B - as hig
Excavation for Telecommunication Line between B/TL/12 to B/TL/15 including pit B/TL/15 at Zone-B as
Concreting for Diaphragm Wall for Zone 2N grid 02/AR from level (870.5 to 874.1 ) (as highlighted) (sec
Inspection of Excavation for Heating and Chilled Water Line at Zone-G including Pit G/DC/06, G/DH/05,
Inspection of Excavation for RO Water Line at Area-D Including Pit ROW-ISC-03, ROW-ISC-02, ARV-03- As
Excavation for Non-Potable Water Line at Zone G - as highlighted
Excavation for Non-Potable Water Line near Plaza Area at Zone C - as highlighted
Anti Termite application under Blinding of Strip Footing Between PC 20 - 22 Zone 1D (as highlighted)
Surface Preparation and Solvent base primer under Foundation of Bridge to south tower abutment grid
Inspection and Compaction Test for backfilling Sub-grade 4th Layer (4 of 4) above Sand Covering for P
Single layer of 4mm thick modified bituminous waterproofing membrane under Strip footing between P
Inspection and Compacton Test for backfilling Sub-grade 5th Layer (5 of 8) around SBC-06 (Wing Wall) -
Surface Preparation prior to start backfill around SBC-08 (Wing Wall) - Right Side at Zone - 4 - as highlig
Surface preparation and solvent base primer under Strip footing between PC 150-152 Zone 2J (as Highl
Protection layer of 4mm thick bituminous protection board under Foundation of Bridge to south tower
Cementitious water proofing under Foundation of Bridge to south tower abutment grid 02C as highlight
Two layers of 4mm thick modified bituminous water proofing under Foundation of Bridge to south towe
Steel Reinforcements for MCPE 2 Counter fort wall Axis 03E to 03G at Zone 2G 2H 2J 2J (as highlighted)
1st and 2nd layer of 4mm thick modified bituminous water proofing membrane for Retaining Wall (Wall
Inspection for Sand bedding under pipe for Non-Potable Water Line near Tower-1 at Zone D - as highlig
"Inspection of Thrust Block for Potable Water Line ( Dia 50mm & 110mm) at Zone-G&K - As Highlight
Inspection and Compaction Test for backfilling Sub-grade 2nd Laye (2 of 3) above Sand Covering for P
Inspection and Compaction Test for backfilling Sub-grade 3rd Laye (3 of 3) above Sand Covering for Po
Inspection and Compaction Test for backfilling Sub-grade 4th Laye (4 of 4) above Sand Covering for P
Inspection for Installation of Non-Potable Water Line Isolation Pit for NPW-ISC-05, NPW-ISC-06, NPW-ISC
Concrete Pouring for Blinding under Boundary Wall @ Grid (M & R/27-29) & (M-R/29-30), at Energy Cen
Sand Bedding for water feature lines (part 7) (HDPE dia 160 mm) between Water play garden and Geys
Inspection & Compaction tests of 7th Layer (Sub-Grade) Backfilling (Out of 8 layers) in Between the Fo
Coordinates & Levels of Blinding for Boundary Wall @ Grid (M & R/27-29) & (M-R/29-30), at Energy Ce
Protection layer 4mm thk Bituminous Protection board on Water Proofing for Footing's & Column's (27
Protection layer 4mm thk Bituminous Protection board on Water Proofing for Footing's & Column's (18
Concrete Pouring & Shuttering for Slab of New Ticketing Booth # 1A As per Attached Highlighted Draw
Surface Preparation and Solvent Base Primer for Retaining Wall (Wall inner and Foundation) (as highli
Steel Reinforcements for Ground Beam between PC 78-80 Zone 1N (as highlighted) with SCR 0175
Shuttering for Ground Beam between PC 78-80 Zone 1N (as highlighted)
Concreting for Ground Beam between PC 78-80 Zone 1N (as highlighted)
Steel reinforcements for Promenade Bridge Abutment wall at Grid 02/C (as highlighted)
Installation of PVC Conduit (Dia. 25mm) & Boxes for Power (Socket Outlet) at the South Small Mosqu
Steel Reinforcements for Infill wall type (02A) axis ( 01/V to 01/U ) (As highlighted) ZONE 1G
Surface preparation & Base primer coating for diaphragm wall Zone 2N (as Highlighted)
Installation and Survey Report for Location and Levels of Anchor Bolts for CANOPY @ BII 49 Zone 1M (as
Installation of Main Potable Water Pipes (110&75&50mmØ-UPVC-Class-5) at Zone G&K(Part2)- From Pi
HDPE Pipe Installation of Water Features pipes; (dia 200mm SDR11-PE100); As per High lighted Att
Check Top of Slab Levels (+2950) for New Ticketing Booth # 1A As per Attached Highlighted Drawing's
Coordinates & Levels for Foundation of wet well (E), Inside Water Garden as highlighted area in attac
Steel Reinforcement for Fountain 1 (1 no at Left side of Outer Canopy 3), at Physic Garden as highligh
Steel Reinforcement for Foundation of wet well (E), Inside Water Garden as highlighted area in at
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 3 layers), along Externa
Concrete Pouring for Blindings under Storm Water Manholes of 2 no's (MH-D-07-03) and (MH-D-07-01-0
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 9 layers), for Foundation
Excavation & Surface Preparation for Foundation of Boundary Wall @ Grid (R/16-22), at Energy Center
Excavation and Bed preparation for water feature lines (part 7) (HDPE dia 160 mm) between Water pl
Inspection and Compaction Test for backfilling Sub-grade 1st Laye (1 of 3) above Sand Covering for Po
Excavation for Potable Water Line at Zone-F - as highlighted
Excavation for Non-Potable Water Line near Tower-1 including Pit NPW-ISC-29 at Zone D - as highlighted
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 2) above Sand Covering for F
Inspection and Compaction Test for backfilling Sub-grade 2nd Laye (2 of 3) above Sand Covering for Po
Inspection and Compaction Test for backfilling Sub-grade 3rd Laye (3 of 4) above Sand Covering for P
Inspection for application of 1 Coat Primer, Damp Proof (1st Coat & 2nd Coat) and Protection Board for
Inspection of Reinforced Concrete Pouring for the Duct Bank of MV Line from C/MV/40 to C/MV/23 at
Inspection of Formwork for the Duct Bank of MV Line from C/MV/40 to C/MV/23 at Zone-C (As Highli
Inspection of Steel Reinforcement for the Duct Bank of MV Line from C/MV/40 to C/MV/23 at Zone-C
Inspection and Compacton Test for backfilling Sub-grade 4th Layer (4 of 8) around SBC-06 (Wing Wall) - R
Inspection of Thrust Block for UPVC Pipe (160 mm Dia) for Fire Water Line at Zone- G&K - As Highligh
Installation of straight UPVC Conduit (Dia.25mm) and Box for Voice and Data (Data, Telephone) at M
Installation of PVC Conduit (Dia.25mm) & Box for Fire Alarm (Smoke Detector) at the South Small M
'Warning Tape Installation For Non-Potable Water (Irrigation Line ); (200mmØ- UPVC-Claas-5 ); As p
'Warning Tape Installation For Non-Potable Water (Irrigation Line ); (200&250mmØ- UPVC-Claas-5 );
Surface Preparation Prior to start Backfilling at RETAINING WALL (as highlighted) axis 01K-01M Zone 4
Level and Location for interrior colmuns for Large Mosque ZONE 1G (as highlighetd) at grId (C1 to 5 , D t
Level and Location for grade beam for Large Mosque ZONE 1G (as highlighetd) at grId (C1, 1 to 2 )
Level and Location for Buttress BII 41 (with beam) Zone 1K
Steel Reeinforcements for Retaining Wall Kicker Promenade Bridge Abutment at Grid M Zone 4 as highl
Surface Preparation and Solvent Base Primer Under Strip Footing between PC 16-18 (as highlighted) Zo
Steel reinforcements for Cafeteria Wall 33, 34, 35 Zone 2A Elev. 869.100 (as highlighted)
Steel Reinforcements for interrior colmuns for Large Mosque ZONE 1G (as highlighetd) at grId (C1 to 5 , D
Shuttering for Blinding of Strip Footing Between PC 20 - 22 Zone 1D (as highlighted)
Concreting for Blinding of Strip Footing Between PC 20 - 22 Zone 1D (as highlighted)
Shuttering for grade beam for Large Mosque ZONE 1G (as highlighetd) at grId (C1, 1 to 2 )
Concreting for grade beam for Large Mosque ZONE 1G (as highlighetd) at grId (C1, 1 to 2 )
Concreting for Infill wall between BOI 69-70 Gridline 02-I - 2-J (as highlighted) Zone 2C
Concreting for RING BEAM Zone 1J (OUTER) Axis 01-2, 01AA to 011D (as highlighted)
Concreting for Infill wall between BIV 5-6 Gridline 01E- 01D (As highlighted) ZONE 1B
Shuttering for Tunnel 1 wall part-C (2nd) (as Highlighted) Zone 2H
Concreting for Tunnel 1 wall part-C (2nd) (as Highlighted) Zone 2H
Steel Reinforcements for Infill wall between Butress 71-72 between Gridline 2K - 2J (As highlighted) ZO
Steel Reinforcements for MCPE 1 6-Isolated Column at Zone 2M 2N (as highlighted) axis 03R, 03-3, 03-2
Solvent Base Primer and Single layer of 4mm thick modified bituminous waterproofing membrane for R
Shuttering for interrior colmuns for Large Mosque ZONE 1G (as highlighetd) at grId (C1 to 5 , D to 5 )
Concreting for interrior colmuns for Large Mosque ZONE 1G (as highlighetd) at grId (C1 to 5 , D to 5 )
HDPE Pipe Installation of Water Features pipes; (160mm SDR11-PE100); As per High lighted Attache
'Warning Tape Installation of Potable Water Pipe for (200mmØ-UPVC-Class-5). As per highlighted Are
'Warning Tape Installation of Potable Water Pipe for (200mmØ-UPVC-Class-5). As per highlighted Are
Inspection for Installation of Non-Potable Water Line Isolation Pit for NPW-ISC-02, NPW-ISC-03, NPW
Surface Preparation prior to start backfill around SBC-06 (Wing Wall) - Right Side at Zone - 4 - as highlig
Inspection and Compaction Test for backfilling Sub-grade 1st Laye (1 of 3) above Sand Covering for Po
Inspection and Compaction Test for backfilling Sub-grade 2nd Laye (2 of 4) above Sand Covering for P
Inspection and Compaction Test for backfilling Sub-grade 2nd Laye (2 of 2) above Sand Covering for Fi
Inspection of Sand bedding under pipe for Non-Potable Water Line near Tower-1 at Zone E - as highlight
Inspection for Installation of MV Line Junction Pit - B/MV/15, B/MV/22 - as highlighted
Inspection and Compacton Test for backfilling Sub-grade 3rd Layer (3 of 8) around SBC-06 (Wing Wall) - R
Concrete Pouring & Shuttering for Lintels and Stiffener Columns of Block work & Doors for wall at Gri
Steel Reinforcement & Shuttering for Lintels and Stiffener Columns of Block work & Doors for wall at
Grouting for Stone Cladding of Boundary wall (Outer Side) at Span 35, 36, 37 & 38, As per Attached H
Grouting for Stone Cladding of Boundary wall (Outer Side) at Span 31, 32, 33 & 34, As per Attached H
Grouting for Stone Cladding of Boundary wall (Outer Side) at Span 27, 28, 29 & 30, As per Attached H
Grouting for Stone Cladding of Boundary wall (Outer Side) at Span 23, 24, 25 & 26, As per Attached H
Coordinates & Levels for Kicker's (Inner & Outer both) of Boundary wall Span 74 & 75, As per Attache
Concrete Pouring & Shuttering for Kicker's (Inner & Outer both) of Boundary wall Span 74 & 75, As p
Steel Reinforcement for foundation of Wet Well F, Inside Water Garden as highlighted area in atta
Excavation & Blinding Levels for Storm Water Manholes of 2 no's (MH-D-07-03) and (MH-D-07-01-01B),
Inspection & Compaction tests of 3rd Layer (Sub-Grade) Backfilling (Out of 8 layers) in Between the Fo
Inspection & Compaction tests of 6th Layer Backfilling (Sub-Grade) (Out of 9 layers) along the Footing
Inspection & Compaction tests of 6th Layer (Sub-Grade) Backfilling (Out of 8 layers) in Between the Fo
Surface preparation Prior to Backfilling surround the Foundation of Seat walls A & C and walls of Whi
Excavation and Soil preparation for Foundation of Seat Walls (Inner), Inside Physic Garden as highligh
Installation of straight PVC Conduit (Dia.20mm) and Boxes for Security (CAM) at Site Tower No. 2 as
Installation of straight PVC Conduit (Dia.20mm) and Boxes for Voice and Data (CAM) at Site Tower No
Installation of PVC Conduit (Dia.25mm) & Boxes for Fire Alarm (Speaker) at the South Small Mosque
Installation of straight PVC Conduit (Dia.25mm) and Box for Fire Alarm (Break Glass) at Public Toilets
Installation of straight PVC Conduit (Dia.25mm) and Box for Voice and Data (Telephone) at Public Toi
Level and Location for MCPE 2 Columns (C-41 to C-47) at Ground Floor axis 03I to 03I-1 zone 2G, 2H, 2J,
Level, Location & Excavation for CENTRAL BRIDGE ABUTMENT Zone 4 (as highlighted) axis 02AG - 02AH
Inspection for Installation of Fire & Security Line Pit - B/FS/03, B/FS/04, B/FS/44 - as highlighted
Level and Location for Strip Footing between PC 150-152 Zone 2J (as highlighted)
Inspection for Installation of Telecommunication Line Pit - B/TL/48, B/TL/31, B/TL/30, B/TL/51 as highlig
Level, Location for MCPE 1 2-Isolated Footing Blinding at Zone 2M 2N (as highlighted) axis 03R, 03-2
Level and Location for RING BEAM Zone 1J (INNER) Axis 01-1, 01AA to 011D (as highlighted)
Inspection and compaction test 3rd and 4th layer Backfill for RETAINING WALL (as highlighted) axis 01K
Excavation for Non-Potable Water Line near Tower-1 at Zone E - as highlighted
Steel Reinforcements and Shear Connector for RING BEAM Zone 2R (INNER) Axis 02-1, 02AZ to 02BC (a
Inspection of Concrete (Plain) Pouring for the Duct Bank of MV Line from H/MV/02 to H/MV/11 at Zone-
1st and 2nd layer of 4mm modified bituminous water proofing membrane under Retaining Wall (as Hig
Inspection of Concrete (Plain) Pouring for the Duct Bank of MV Line from H/MV/25 to H/MV/02 at Zone-
Inspection of Concrete (Plain) Pouring for the Duct Bank of MV Line from C/MV/12 to H/MV/25 at Zone
Steel Reeinforcements for Retaining Wall Promenade Bridge Abutment at Grid P Zone 4 as highlighted
Inspection of Concrete (Plain) Pouring for the Duct Bank of MV Line from C/MV/13 to C/MV/12 at Zone-
Steel Reinforcements for grade beam for Large Mosque ZONE 1G (as highlighetd) at grId (C1, 1 to 2 )
Inspection and Compaction Test for backfilling Sub-grade 1st Laye (1 of 4) above Sand Covering for P
Steel Reinforcements for Isolated Circular Columns (C6, C7 )for CAFETERIA (as highlighted) ZONE 2A
Steel Reinforcements for Infill wall axis ( 01U to 01T ) (As highlighted) ZONE 1G
Steel Reinforcements for Strip Footing between PC 150-152 Zone 2J (as highlighted)
Inspection and Compaction Test for backfilling Sub-grade 2nd Laye (2 of 2) above Sand Covering for Fir
Shuttering for Strip Footing between PC 150-152 Zone 2J (as highlighted)
Concreting for Strip Footing between PC 150-152 Zone 2J (as highlighted)
Anti Termite application under MCPE 1 2-Isolated Footing at Zone 2M 2N (as highlighted) axis 03R, 03-2
Shuttering for Blinding of MCPE 1 2-Isolated Footing at Zone 2M 2N (as highlighted) axis 03R, 03-2
Concreting for Blinding of MCPE 1 2-Isolated Footing at Zone 2M 2N (as highlighted) axis 03R, 03-2
Inspection of Excavation for Heating and Chilled Water Line Branch at Zone-F - As highlighted
Shuttering for MCPE 2 Columns (C-41 to C-47) at Ground Floor axis 03I to 03I-1 zone 2G, 2H, 2J, 2K (as h
Steel Reinforcements and Shear Connector for RING BEAM Zone 1J (INNER) Axis 01-1, 01AA to 011D (a
Shuttering and Scaffolding for RING BEAM Zone 1J (INNER) Axis 01-1, 01AA to 011D (as highlighted),
Inspection for Blinding Concrete under MV Line Junction Pit B/MV/08, B/MV/09, B/MV/21, C/MV/12,
Steel Reinforcements for MCPE 2 Counter fort wall (inner) at axis 02-X to 02Y As highlighted
Inspection and Compaction Test for backfilling Sub-grade 1st Laye (1 of 2) above Sand Covering for Fir
Installation and Survey Report for Location and Levels of Anchor Bolts for RING BEAM Zone 1J (INNER) A
Inspection and Compaction Test for backfilling Sub-grade 1st Laye (1 of 2) above Sand Covering for Fi
Installation of Main Fire Water Pipes (160mmØ-UPVC-Class-5) From Pit (G/F/07) to Pit (L/F/01) Incl
HDPE Pipe Installation of Water Features pipes; (110mmØ CLASS-PE100); As per High lighted Attach
HDPE Pipe Installation of Water Features pipes; (dia 250mm SDR11-PE100); As per High lighted Att
Inspection Of Pipe Installation For Non-Potable Water (Irrigation Line ); (160mmØ- UPVC-Claas-5 );
Inspection of Concrete Pouring for Canopy Column Neck of Seating Area (1) Zone-K (SA-17) - As Highlig
Steel Reinforcement & Shuttering for Lintels of Doors & Block work & Stiffner Column's for all walls I
Steel Reinforcement & Shuttering for Lintels of Doors & Block work & Stiffner Column's for all walls In
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 9 layers), for Foundation
Concrete Pouring & shuttering for Columns (C3A, 3 no's) of Pargola Footings, at Grid (P/3, 4 & 5),
Coordinates & Levels of Column's (C3A, 3 no's) of Pargola Footings, at Grid (P/3, 4 & 5), at Manage
Coordinates & Levels for Roof Slab of Plant Room, at Physic Garden, at highlighted area in attache
Level and Location for (1st) Mass Concrete of Strip Footing Between PC 20 - 22 Zone 1D (as highlighted)
Level and Location for walls for south Small MOSQUE Axis (C,1-2, 1,C-G, G,1-3, F,3-4 & 5-6, 6,F-G, G,6-8
Shuttering for walls for south Small MOSQUE Axis (C,1-2, 1,C-G, G,1-3, F,3-4 & 5-6, 6,F-G, G,6-8 ) (as hi
Level and Location for Mass Concrete of VIP AUDITORIUM axis ( 04VA,AVA to BVA & AVA, 03VA to 08VA
Shuttering for Mass Concrete of VIP AUDITORIUM axis ( 04VA,AVA to BVA & AVA, 03VA to 08VA ) Zone 1
Antitermitte for Mass Concrete of VIP AUDITORIUM axis ( 04VA,AVA to BVA & AVA, 03VA to 08VA ) Zone
Level, Location & Excavation for VIP AUDITORIUM FOUNDATION axis ( 04VA,AVA to BVA & AVA, 03VA t
Antitermitte for Mass Concrete of VIP AUDITORIUM axis ( 01VA to 03VA, DVA to 6VA ) Zone 1H (as highl
Surface Preparation and Paint Touch Up Inspection in Crescent 01 Zone 5, 1B & Zone 4, 1C & 1D, fro
Installation of Yellow Warning Tape for Medium Voltage Ductbank (UPVC Conduit Dia. 160mm) at A
Installation of straight UPVC Conduit (Dia. 32mm) & Boxes for Power System (Cleaner Socket & Fused
Installation of straight UPVC Conduit (5x160mm) Medium Voltage Ductbank no. CC/D-MV/05 (from M
Installation of straight UPVC Conduit (Dia.25mm) and Box for Fire Alarm (Flashing Beacon, Break Gl
Installation of straight UPVC Conduit (Dia.25mm) and Box for Voice and Data (Data, Telephone) at
Installation of straight UPVC Conduit (Dia.25mm) and Box for Fire Alarm (Flashing Beacon) at Man
Installation of UPVC Conduit (Dia. 25mm) and Box for Fire Alarm (Smoke Detector & Voice Alarm) at t
Inspection and Compaction Test for backfilling Sub-grade 1st Laye (1 of 2) above Sand Covering for Fir
Inspection and Compacton Test for backfilling Sub-grade 2nd Layer (2 of 8) around SBC-06 (Wing Wall) - R
"Inspection and Compaction Test for backfilling Sub-grade 6th Layer (6 of 8) around, Corner connection
Inspection and Compacton Test for backfilling Sub-grade 1st Layer (1 of 8) around SBC-06 (Wing Wall) - R
Inspection and Compactin Test for backfilling Sub-grade 1st Layer ( 1 of 1) above GreenTiles for Fire &
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 1) above Green Tiles Telecom
"Inspection and Compaction Test for backfilling Sub-grade 5th Layer (5 of 8) around, Corner connection
Inspection for Installation of MV Line Junction Pit - C/MV/02, G/MV/01, G/MV/15, K/MV/01 - as highligh
"Inspection of Formwork for Canopy Column Neck of Seating Area (1) Zone-K (SA-17) - As Highlighted"
Installation of Anchor Bolts and Check Co-ordinates and Levels for Canopy Foundation for Seating Area-1
Grouting for Stone Cladding on Column's C85, C86, C87 & C88 (All Sides), As per Attached Highlighted
Grouting for Stone Cladding on Column's C81, C82, C83 & C84 (All Sides), As per Attached Highlighted
Grouting for Stone Cladding on Column's C77, C78, C79 & C80 (All Sides), As per Attached Highlighted
Inspection and compaction test 1st and 2nd layer Backfill for RETAINING WALL (as highlighted) axis 01K
Grouting for Stone Cladding of Boundary wall (Inner & Outer Sides) at Span 70, As per Attached Highl
Grouting for Stone Cladding of Boundary wall (Inner Side) at Span 68B & 69 and Column C70 (All Sides
Grouting for Stone Cladding of Boundary wall (Outer Side) at Span 68B & 69 and Column C69 (All Side
Level and Location for Infill wall between BIV 5-6 Gridline 01E- 01D (As highlighted) ZONE 1B
Concrete pouring & Shuttering for Walls of Plant room at Maze Garden, at highlighted area in attach
Protection layer of 4mm thick bituminous protection board for foundation and wall of retaining wall [in
Screed Protection 50mm thick above foundation of retaining wall [inner] axis 01AI to 01AB (as highligh
Steel Reinforcements for Infill wall between BIV 107-108 between Gridline 02-1 AL - 02-1 AM (As highl
Shuttering for Infill wall between BIV 5-6 Gridline 01E- 01D (As highlighted) ZONE 1B
Coordinates & Levels for Walls of Plant room at Maze Garden, at highlighted area in attached drawing
Inspection & Compaction tests of 5th Layer Backfilling (Sub-Grade) (Out of 9 layers) for Foundation o
Inspection & Compaction tests of 4th Layer Backfilling (Sub-Grade) (Out of 9 layers) for Foundation o
Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Grade) (Out of 9 layers) for Foundation o
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 9 layers) for Foundation o
Grouting of Installed Anchor bolt and under Baseplate at Zone 2H INNER ring beam (as highlighted)
Grouting of Installed Anchor bolt and under Baseplate at Zone 2H INNER ring beam (as highlighted) u
Surface Preparation and Solvent base Primer for foundation and wall of retaining wall [inner] axis 01AI
two layers of 4mm thick modified bituminous waterproofing membrane for foundation and wall of retaini
Excavation and Soil preparation for Foundation of Boundary Wall @ Grid (M/22-29) & (29-30/M-R), at
Inspection & Compaction tests of 5th Layer (Sub-Grade) Backfilling (Out of 6 layers) in Between the Fo
Inspection & Compaction tests of 5th Layer Backfilling (Sub-Grade) (Out of 9 layers) along the Footing
Inspection & Compaction tests of 9th (Final) Layer Backfilling (Sub-Grade) (Out of 9 layers) for Foun
2nd layer 4mm thk Modified Bituminous Water Proofing Membrane for Footing's & Column's (27 no's) (A
Inspection & Compaction tests of 3rd Layer (Sub-Grade) Backfilling (Out of 6 layers) in Between the Fo
Sand Bedding for Low Current Lines of Telecom (from MH/WG/LC/5 to 9) and Fire Alarm & Security (f
Sand Bedding for Electrical Lines of Low Voltage (MH/WG/LV/17 to 21 & 24 to 29) and Emergency lin
Grouting for Stone Cladding of Boundary wall (Inner Side) at Span 67C & 68A and Column C68B (All Si
Grouting for Stone Cladding of Boundary wall (Outer Side) at Span 67C & 68A and Column C67D & C68A
Grouting for Stone Cladding of Boundary wall (Inner Side) at Span 67A & 67B and Column C67B (All Si
Grouting for Stone Cladding of Boundary wall (Outer Side) at Span 67A & 67B and Column C67C (All Si
Grouting for Stone Cladding of Boundary wall (Inner Side) at Span 63, 66A & 66B, As per Attached Hig
Inspection of First Layer Block Layout at Grid (R/1-2), Inside Management Building, As per Highlighte
'Warning Tape Installation For Non-Potable Water (Irrigation Line ); (200mmØ- UPVC-Claas-5 ); As p
Level and Location for Isolated Circular Columns ( C1, C2 ) for CAFETERIA (as highlighted) elev. 869.10
Shuttering for Isolated Circular Columns ( C1, C2 ) for CAFETERIA (as highlighted) elev. 869.10 ZONE 2A
Steel Reinforcements for Diaphragm Wall for Zone 2N grid 02/AR from level (870.5 to 874.1 ) (as highlig
Shuttering for Infill wall between BOI 69-70 Gridline 02-I - 2-J (as highlighted) Zone 2C
Level and Location for MCPE 3 Counter fort & wall (inner) at axis 02-R to 03D As highlighted upto 871.0
Concreting for MCPE 3 Counter fort & wall (inner) at axis 02-R to 03D As highlighted upto 871.00
Shuttering for MCPE 3 Counter fort & wall (inner) at axis 02-R to 03D As highlighted upto 871.00
Concreting for MCPE 2 Columns (C-65 to C-74) between (03/m - 03/P) zone 2G, 2H, 2J, 2K (as highlighte
Shuttering for MCPE 2 Columns (C-65 to C-74) between (03/m - 03/P) zone 2G, 2H, 2J, 2K (as highlighted
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 2) above Sand Covering for N
Inspection and Compaction Test for backfilling Sub-grade 1st Laye (1 of 1) above Sand Covering for Non
Level and Location for MCPE 2 Columns (C-65 to C-74) between (03/m - 03/P) zone 2G, 2H, 2J, 2K (as hi
Surface Preparation prior to start backfill around SBC-06 (Wing Wall) - Right Side at Zone - 4 - as highlig
Inspection and Compaction Test for Backfilling Sub-grade 3rd Layer (3 of 4) for Storm Water Line From
Bolt Tightening Inspection of Crescent 01, Zone 4 - 1D from Axis 01J to 01M
Pre-Assembly Bolt Tightening Inspection of Crescent 02, Zone 4 - 2J, from Axis 02AD to 02AB
Inspection and Compaction Test for Backfilling Sub-grade 3rd Layer (3 of 4) for Storm Water Line From
Pre-Assembly Bolt Tightening Inspection of Crescent 02, Zone 6 - 2E, Axis 02N & 02O
Weld Visual & NDT Inspection for the Crescent 02, Zone 4 - 2J, from Axis 02AD to 02AB
Level and Location for Infill wall between BOI 69-70 Gridline 02-I - 2-J (as highlighted) Zone 2C
"Inspection and Compaction Test for backfilling Sub-grade 4th Layer (4 of 8) around, Corner connection
Inspection for Installation of MV Line Junction Pit - B/MV/17, G/MV/14 - as highlighted
Inspection of Excavation for Heating and Chilled Water Line at Zone-G - As highlighted
Inspection of Excavation for RO Water Line at Area-D - As highlighted
Inspection for Laying of GreenTiles above the pipe for Fire & Security Distribution Line from B/FS/14 to
Inspection for Laying of Green Tiles above the pipe for Telecommunication Line from B/TL/10 to C/TL/1
Inspection of Sand Covering to protect the pipe for Non-Potable Water Line at Zone- C - as highlighted
Inspection for Sand bedding under pipe for MV Line from G/MV/31 to G/MV/11 at Zone-G - as highlighte
Inspection for Blinding Concrete under MV Line Junction Pit B/MV/15, B/MV/22, G/MV/11, G/MV/26 - as
Excavation for MV Line from C/MV/29 TO C/MV/01 at Zone- - as highlighted in the attached drawing
Installation of Under Ground (150mmØ- UPVC-Class-5) for Fire Main Line & Siamese Connection 150m
Inspection of Excavation for Storm Water Line from MH-O-01 to G-O-44 and G-O-45 including Gully G-O-
Inspection and Compaction Test for Backfilling Sub-grade 2nd Layer (2 of 4) for Storm Water Line From
Inspection and Compaction Test for Backfilling Sub-grade 2nd Layer (2 of 4) for Storm Water Line From
"Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 4) around, Corner connection
Inspection Of Pipe Installation For Non-Potable Water (Irrigation Line ); (160mmØ- UPVC-Claas-5 );
' Gravel 3/8" Backfilling and Geotextile in pipes OUT FALL-K for (450 mm Ø- UPVC Pipes-Class 4 )for
' Warning Tape Installation in pipesOUT FALL-K for (450 mm Ø- UPVC Pipes-Class 4 )for Storm Water
Pipe sleeve installation for strip footing ; (160mmØupvc class 4) Between axis (AM&AN) at Crescent ;
' Pipe Installation of Foul Water Line for (110mmØ - UPVC- Class 4) from (FW-A-3-11). At CRECENT Zo
'Bedding of Gravel 3/8" and Geotextile Surrounding Foul Water Line for (110mmØ - UPVC- Class 4) fr
'Warning Tape Installation of Fire Fighting Networks for (200&250mmØ-UPVC-Class-5). As per highlig
Inspection of Alignment for the Installed Baseplates in Crescent 02 Zone 5 - 2H Inner
Level and Location for Mass Concrete of VIP AUDITORIUM axis ( 01VA to 03VA, DVA to 6VA ) Zone 1H (a
Level and Location for Buttress (with beam ) , BII 49, Zone 1M (as highlighted)
Installation and Survey Report for Location and Levels of Anchor Bolts for CANOPY @ BII 49 Zone 1M (as
Inspection of Installation and Alignment for the Crescent 01 Zone 3 - 1E, From Axis 01M to 01P
Concreting for Slab on grade for Large Mosque ZONE 1G (as highlighetd) at grid (2 to 5 & C1 to F )
Concreting for Staircase, Shaft Opening & ground beam for Large Mosque ZONE 1G (as highlighetd) at gri
Concreting for Blinding of SOG for Large Mosque ZONE 1G (4th) (as highlighetd) at grid (D-F & 5-6 )
Concreting for RING BEAM Zone 2H (INNER) Axis 02-1, 02AB to 02Y (as highlighted)
Shuttering for Buttress (with beam ) , BII 49, Zone 1M (as highlighted)
Concreting for Buttress (with beam ) , BII 49, Zone 1M (as highlighted)
Surface Preparation for RC Strip Footing between PC 77-79 (as highlighted) Zone 1N
Concreting for Infill Wall at Zone 2M between Gridline 02-1AP - 02-1AO (as highlighted) (BII 110-111)
Concreting for Diaphragm Wall axis 02R (1st Section as highlighted) upto 3.6M ht. only (Zone 2N)
Concreting for Diaphragm Wall for Zone 2N grid 02/AR from level (874.6 to 877 ) (as highlighted)
Concreting for MCPE 2 Columns (C-25 to C-40) at Ground Floor axis 03E to 03I zone 2G, 2H, 2J, 2K (as hi
Concreting for MCPE 2 Columns (C-49 to C-64) at Ground Floor axis 03J to 03M zone 2G, 2H, 2J, 2K (as h
Steel Reinforcements for Wall south Small MOSQUE axis( C,1 to 2 ) (as highlighted)
Concreting for RING BEAM Zone 1H (INNER) Axis 01-1, 01AA to 01Z, 01Y to 01W (as highlighted)
Concreting for RING BEAM Zone 1H (OUTER) Axis 01-2, 01W to 01AA (as highlighted)
Concreting for Blinding of SLAB ON GRADE OF LARGE MOSQUE at Zone 1G (as highlighted) (1ST)
Grouting of Installed Anchor bolt and under Baseplate at Zone 1H inner and outer ring beam (as highli
Concreting for Slab on grade for Large Mosque ZONE 1G (as highlighetd) at grad (2 to 5 & C1 to B )
Concreting for Blinding of SOG for Large Mosque ZONE 1G (2nd) (as highlighetd) at grad (C1-E & 2-5 )
NOTIFACTION TO START REMOVING THE 2ND STAGE SUBSTATIONS (R3,R4) AND SHIFT IT TO TEMPORARY
Grouting of Installed Anchor bolt and under Baseplate at Zone 1H inner and outer ring beam (as highli
Concreting for Blinding of SOG for Large Mosque ZONE 1G (3rd) (as highlighetd) at grid (C-E & 5-6 )
Concreting for Slab on grade for Large Mosque ZONE 1G (as highlighetd) at grId (5 to 6 & C to E )
Level and Location for Diaphragm Wall for Zone 2N grid 02/AR from level (874.6 to 877 ) (as highlighte
Shuttering for Diaphragm Wall for Zone 2N grid 02/AR from level (874.6 to 877 ) (as highlighted)
Concrete Pouring for Blinding under Low current Handholes of (MH/WG/LC/5 to 9) and (MH/WG/FA/7
Concrete Pouring for Blinding under Electrical Handholes of 10 Nos (MH/WG/EM/7 to15 & 29), (MH/W
Inspection & Compaction tests of 4th Layer (Sub-Grade) Backfilling (Out of 6 layers) in Between the Fo
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 3 layers), along External
Sand Bedding for water feature lines (part 5) (HDPE dia 160 mm) from Centre of Geyser Garden to Cen
Excavation & Surface Preparation for Foundation of Boundary Wall @ Grid (M/16-22), at Energy Center
Sand Bedding for Water Feature Lines (110 dia) from Plant room to MH-D-01-A1-01, at Maze garden, a
Aluminum Flashing & Sealant for Waterproofing on Foundation & wall of Seat walls A & C (All Sides)
Slatet Layer 4mm thk Modified Bituminous Membrane on Waterproofing for Foundation & wall of Seat w
Steel Reinforcement for Roof Slab of Plant Room, at Physic Garden, at highlighted area in attached
Surface Preparation prior to Water Proofing for Foundation of Plant Room (Inner side), Inside Physic
Inspection of Spatter Dash (Rough Coat) for External Elevations at Site Tower 2, as per the attached
Grouting for Stone Cladding of Boundary wall (Inner Side) at Span 15, 16, 17 & 18, As per Attached Hi
'Potable Water Pipes Sand Cover & Pipes Protection (30 cm above Pipes). As per highlighted Area in
'Potable Water Pipes Sand Cover & Pipes Protection (30 cm above Pipes). As per highlighted Area in
'Warning Tape Installation of Fire Fighting Networks for (250mmØ-UPVC-Class-5). As per highlighted
Surface Preparation and Paint Touch Up Inspection in Butterfly Garden from Axis 01 - 21
Bolt Tightening Inspection of Butterfly Garden From Axis 01 - 21
Preliminary Inspection of Erected Steel in the Butterfly Garden From Axis 01 - 21
Weld Visual & NDT Inspection for the Butterfly Garden from Axis 1 to 21
Installation of UPVC Conduit (Dia. 25mm) & Boxes for Lighting System (Lighting Fixture) at New Ticke
Inspection of Installation and Alignment for the Butterfly Garden From Axis 01 -21
Inspection for Blinding Concrete under MV Line Junction Pit F/MV/03, F/MV/09, F/MV/01 - as highlighte
"Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 4) around, Corner connection
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 1) above Sand Covering for N
Inspection of Compaction Test for backfilling Sub-grade 1 st Layer (1 of 1) above Sand Covering for No
"Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 1) above Red Tiles for MV Li
Inspection for Installation of MV Line Junction Pit - B/MV/16, G/MV/18, K/MV/02 - as highlighted
Inspection and Compaction Test for Backfilling Sub-grade 1st Layer (1 of 4) for Storm Water Line From
Inspection and Compaction Test for Backfilling Sub-grade 1st Layer (1 of 4) for Storm Water Line From
Coordinates & Levels for foundation of Wet Well F, Inside Water Garden as highlighted area in attach
Inspection and Compaction Tests of 6th Layer (Sub Garde) Backfilling (Out of 7 Layers) along the Boun
Inspection & Compaction Tests of Backfilling (Sub Grade) (Upto level +876.20) for Support from bothsi
Inspection of Spatter Dash (Rough Coat) Prior to Plastering of Walls, all sides of Gents Toilets Inside P
3rd Coat Cementitious Water proofing for Foundations, Columns and Walls (All sides) of Internal Fou
3rd Coat Cementitious Water proofing for Footings top & Walls of Seat Walls (Left Side) (Outer), Insid
3rd Coat Cementitious Water proofing for Footings top & Walls of Seat Walls (Right Side) (Outer) for A
2nd Coat Cementitious Water proofing for Footings top & Walls of Seat Walls (Right Side) (Outer) for A
1st Coat Cementitious Water proofing for Footings top & Walls of Seat Walls (Outer) (Remaining Parts)
Concrete Pouring & Shuttering for Footing's of Boundary wall Span 74 & 75, As per Attached Highligh
Concrete Pouring & Shuttering for foundation of Wet Well F, Inside Water Garden as highlighted area
2nd Coat Damp proofing for Footings & Walls of Seat Wall (Outer) (Remaining Parts) All sides, Inside
"Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 4) around, Corner connection
Inspection of Sand bedding under pipe for Fire Water Line at Zone-K including branch - as highlighted (S
Inspection of Sand bedding under pipe for Potable Water Line at Zone-K - as highlighted (Stock Pile # 13
Grouting for Stone Cladding of Boundary wall (Outer Side) at Span 62, 66A & 66B and Column C67A (Al
Inspection of Sand bedding under pipe for MV Line from B/MV/15 TO B/MV/23 at Zone-B - as highlighte
Grouting for Stone Cladding of Boundary wall (Inner Side) at Span 58 & 62 and Column C63 (All Sides)
Coordinates & Levels for Footing's of Boundary wall Span 74 & 75, As per Attached Highlighted Drawi
Steel Reinforcement for Walls of Plant room at Maze Garden, at highlighted area in attached drawing
Sand Bedding for water feature lines (part 6) (HDPE dia 250 mm) From entrance of Boat garden to the
Excavation and Bed preparation for water feature lines (part 5) (HDPE dia 160 mm) from Centre of Ge
Excavation & Bed preparation for Water Feature Lines (110 dia) from Plant room to MH-D-01-A1-01, a
Inspection & Compaction tests of 8th Layer Backfilling (Sub-Grade) (Out of 9 layers) for Foundation o
Excavation & Bed Preparation for Low Current Lines of Telecom (from MH/WG/LC/5 to 9) and Fire Alar
Excavation & Bed Preparation for Electrical Lines of Low Voltage (MH/WG/LV/17 to 21 & 24 to 29) a
Inspection of Concrete (Plain) Pouring for the Duct Bank of MV Line from C/MV/13 to C/MV/20 at Zone-
Inspection of Concrete (Plain) Pouring for the Duct Bank of MV Line from C/MV/20 to C/MV/14 at Zone-
Inspection and Compaction Test for backfilling Sub-grade above Sand Covering for Non-Potable Water L
Inspection for Installation of MV Line Junction Pit - B/MV/13, F/MV/04, F/MV/05, G/MV/24 - as highligh
Inspection for Laying of Red Tiles above the pipe for MV Line from B/MV/11 to B/MV/25 at Zone-B as hi
Inspection for application of 1 Coat Primer, Damp Proof (1st Coat & 2nd Coat) and Protection Board for
Surface Preparation prior to start Waterproofing for SBC-08 (Right Side)- Upstand, Footing and wall of W
Installation of Stub up PVC Conduit (Dia.32mm) for CCTV System (CAM-153) at External Boundary Wal
Notification to start Excavation Prior to start Excavation for Deonian Garden Zone 2M
Installation and Survey Report for Location and Levels of Anchor Bolts for CANOPY @ BII 45 Zone 1L (as
Installation of straight UPVC Conduit (Dia. 32mm) & Boxes for Power System (Cleaner Socket & Fused
Installation and Survey Report for Location and Levels of Anchor Bolts for RING BEAM Zone 1J (OUTER)
Shuttering for MCPE 2 Columns (C-49 to C-64) at Ground Floor axis 03J to 03M zone 2G, 2H, 2J, 2K (as hi
Steel Reinforcements for MCPE 1 6-Isolated Footing at Zone 2M 2N (as highlighted) axis 03R, 03-3, 03-2
Shuttering for MCPE 1 6-Isolated Footing at Zone 2M 2N (as highlighted) axis 03R, 03-3, 03-2
Concreting for MCPE 1 6-Isolated Footing at Zone 2M 2N (as highlighted) axis 03R, 03-3, 03-2
Grouting of Installed Anchor bolt and under Baseplate at Zone 2G INNER ring beam (as highlighted)
Grouting of Installed Anchor bolt and under Baseplate at Zone 2G INNER ring beam (as highlighted) u
Shuttering for Buttress (with beam ) , BII 45, Zone 1L (as highlighted)
Concreting for Buttress (with beam ) , BII 45, Zone 1L (as highlighted)
Shuttering and Scaffolding for RING BEAM Zone 1J (OUTER) Axis 01-2, 01AA to 011D (as highlighted),
Concreting for Buttress (with beam ) , BOI 46 & 47, Zone 1L (as highlighted)
Shuttering for Buttress (with beam ) , BOI 46 & 47, Zone 1L (as highlighted)
Steel Reinforcements and Shear Connector for RING BEAM Zone 1J (OUTER) Axis 01-2, 01AA to 011D (
Shuttering for INFILL WALL between BII 108-109 Gridline 02-1AM- 02-1AN (as highlighted) Zone 2M
Concreting for INFILL WALL between BIV 108-109 Gridline 02-1AM- 02-1AN (as highlighted) Zone 2M
Level and Location for Buttress (with beam ) , BOI 46 & 47, Zone 1L (as highlighted)
Level and Location for MCPE 2 Columns (C-49 to C-64) at Ground Floor axis 03J to 03M zone 2G, 2H, 2J,
Level, Location & Excavation for MCPE 1 6-Isolated Footing at Zone 2M 2N (as highlighted) axis 03R, 03-
Level and Location for Buttress (with beam ) , BII 45, Zone 1L (as highlighted)
Level and Location for excavation for VIP Auditorium Foundation (2nd part) at Zone 1H Axis 1VA, D-G/VA
Level and Location for Mass Concrete (1st) of Strip Footing between PC 13-15, 16-18 Zone 1C (as highlig
Weld Visual & NDT Inspection for the Crescent 02, Zone 4 - 2L Axis 02AL to 02AH
Inspection of Alignment for the Installed Baseplates in Crescent 01 Zone 2 - 1H Inner
Installation and Survey Report for Location and Levels of Anchor Bolts for CANOPY @ BII 41 Zone 1K (as
Level and Location for INFILL WALL between BIV 108-109 Gridline 02-1AM- 02-1AN (as highlighted) Zo
Inspection of Alignment for the Installed Baseplates in Crescent 01 Zone 2 - 1H Outer
Level and Location for Promenade Bridge Abutment Retaining wall foundation at Grid 2C (as highlighte
'Warning Tape Installation For Non-Potable Water (Irrigation Line ); (200mmØ- UPVC-Claas-5 ); As p
'Warning Tape Installation For Non-Potable Water (Irrigation Line ); (160&200mmØ- UPVC-Claas-5 );
Single layer of 4mm thick modified bituminous waterproofing membrane for Strip footing between PC
Surface preparation and solvent base primer for Strip footing between PC 150-152 Zone 2J (as Highligh
Installation of Main Potable Water Pipes (110mmØ-UPVC-Class-5) at Zone-C From Point (647971.159 E
Concreting for BUTTRESS BII 41 (with beam) Zone 1K
Shuttering and shear connector for BUTTRESS BII 41 (with beam) Zone 1K
Steel Reinforcements for Infill wall between BIV 5-6 Gridline 01E- 01D (As highlighted) ZONE 1B
Single Layer of 4mm thick modified bituminous waterproofing membrane under Strip Footing between P
Protection layer of Geotextile and Screed under Strip Footing between PC 97-99 (as highlighted) Zone 2
Two Layers of 4mm thick modified bituminous waterproofing membrane for retaining wall (2m) and found
Protection layer of 4mm thick bituminous protection board for retaining wall (2m) and foundation inner
Surface Preparation and Solvent base Primer under Strip Footing between PC 97-99 (as highlighted) Zon
Steel Reinforcements for Diaphragm Wall for Zone 2N grid 02/AR from level (874.6 to 877 ) (as highlight
Shuttering for Promenade Bridge Abutment Retaining wall foundation at Grid 2C (as highlighted)
Concreting for Promenade Bridge Abutment Retaining wall foundation at Grid 2C (as highlighted)
Anti Termite application under Strip Footing between PC 13-15, 16-18 Zone 1C (as highlighted)
Shuttering for Mass Concrete (1st) of Strip Footing between PC 13-15, 16-18 Zone 1C (as highlighted)
Excavation for MV Line from B/MV/15 TO B/MV/23 at Zone-B including Pit B/MV/22 - as highlighted in
Concreting for Mass Concrete (1st) of Strip Footing between PC 13-15, 16-18 Zone 1C (as highlighted)
Inspection of Excavation for Storm Water Line From G-O-47 to G-O-46 at Zone-2B including Gully G-O-46
"Inspection for Installation of MV Line Junction Pit - F/MV/11, F/MV/06 - as highlighted "
Inspection of Installation and Alignment for the Crescent 02 Zone 7 - 2B & 2C, From Axis 02D to 02J
Inspection for Casting Blinding Concrete under Manhole for MH-K-10 - as highlighted
"Excavation for Storm Water Line from MH-K-09 to MH-K-10 including Manhole MH-K-10 - As highlighte
Excavation for Fire Water Line at Zone-K including branch and Pit - K/F/07- as highlighted
Excavation for Potable Water Line at Zone-K - as highlighted
Excavation for Foul Water Line from FW-A-3-7.3 to FW-A-3-7.4 including Manhole FW-A-3-7.4 prior to s
Inspection of Sand Covering to protect the pipe for Non-Potable Water Line at Zone-B as highlighted in
Inspection of Sand Covering to protect the pipe for Non-Potable Water Line at Zone-B & G as highlighte
Inspection of Sand Bedding under pipe for Non-Potable Water Line at Zone K including Branch - as highli
Inspection of Concrete (Plain) Pouring for the Duct Bank of MV Line from B/MV/08 to C/MV/05 at Zone
Inspection of Sand Bedding under pipe for MV Line from B/MV/01 TO B/MV/15 and B/MV/23 to G/MV/20
Inspection of Installation and Alignment for the Crescent 02 Zone 6 - 2D, From Axis 02J to 02N
Inspection of Alignment for the Installed Baseplates in Crescent 02 Zone 5 - 2G Inner
Weld Visual & NDT Inspection for the Baseplate Washer Plates in Crescent 01, Zone 4 1D
Inspection of Installation and Alignment for the Crescent 01 Zone 4 - 1D, From Axis 01J to 01M
Weld Visual & NDT Inspection for the Crescent 02, Zone 4 - 2J Axis 02AE
Weld Visual & NDT Inspection for the Crescent 02, Zone 4 - 2K Axis 02AH to 02AE
Surface Preparation and Paint Touch Up Inspection in Crescent 02 Zone 6, 2D from Axis 02J to 02N
Inspection of Installation and Alignment for the Crescent 01 Zone 4 - 1C, From Axis 01G to 01J
Inspection of Installation and Alignment for the Crescent 01 Zone 5 - 1B, From Axis 01D to 01G
Inspection of Metal Plaster Grove for External Elevations at Site Tower 2, as per the attached Drawing
Surface Preparation prior to Backfilling along External Grade Beam & Foundations, from outer side
Sand Bedding for Low Current Lines of Telecom (from MH/ZG/TC/6 to 8) and Fire Alarm & Security (fr
Sand Bedding for Electrical Lines of Low Voltage (from MH/ZG/LV/14 to 16) and Emergency (from MH/
Inspection & Compaction tests of 2nd Layer (Sub-Grade) Backfilling (Out of 6 layers) in Between the Fo
Inspection & Compaction tests of 9th (Final) Layer (Sub-Base) Backfilling (after 8 layers Sub Grade)
Steel Reinforcement for foundation of Wet Well F, Inside Water Garden as highlighted area in attache
Steel Reinforcement for Footing & Kicker's of Boundary wall Span 74 & 75, As per Attached Highlight
1st Coat Damp proofing for Footings & Walls of Seat Wall (Outer) (Remaining Parts) All sides, Inside P
2nd layer 4mm thk Modified Bituminous Water Proofing Membrane for Footing's & Column's (18 no's) (A
Shuttering and Shear Connector for Buttress with Beam BIV 41, 44 Zone 1K 1L (as highlighted)
' Sand Cover For Fire Water Pipes (200 & 250mmØ-UPVC-Class-5) . As per highlighted Area in the at
Inspection of Sand Bedding under pipe for Fire Water Line near Management Building at Zone-F including
Excavation for Potable Water Line Branch at Zone-F including Pit - F-PW-08, F/PW/02 - as highlighted
Excavation for MV Line from G/MV/31 to G/MV/11 at Zone-G including Pit G/MV/31, G/MV/19, G/MV/11
Inspection of Sand Covering to protect the pipe for Non-Potable Water Line at Zone-B & G as highlighte
Inspection and Compaction Test for backfilling Sub-grade above Sand Covering for Non-Potable Water Li
"Inspection for Installation of MV Line Junction Pit - B/MV/07, G/MV/16- as highlighted "
Level and Location for MCPE 3 Counter fort and wall (inner) at axis 03-1,03A As highlighted ZONE 2E
Level and Location for Promenade Bridge Abutment RETAINING wall at Grid 1P (as highlighted)
Pipe Installation of Sub-Surface Drainage (Main Line & Branches) Pipes; (110 &160 mmØ, UPVC-CLASS
'Pipe Installation of Strom Water pipe OUT FALL-K for (450 mm Ø- UPVC Pipes-Class 4 )for Storm Wat
'Bedding of Gravel 3/8" and Geotextile surrounding in pipes (450 mm Ø- UPVC Pipes-Class 4 ) for Sto
Steel Reinforcements for Infill wall between BO 69-70 Gridline 02-I - 2-J (as highlighted) Zone 2C
Shuttering for Promenade Bridge Abutment RETAINING wall at Grid 1P (as highlighted)
Concreting for Promenade Bridge Abutment RETAINING wall at Grid 1P (as highlighted)
Shuttering for MCPE 3 Counter fort and wall (inner) at axis 03-1,03A As highlighted ZONE 2E
Concreting for MCPE 3 Counter fort and wall (inner) at axis 03-1,03A As highlighted ZONE 2E
"Excavation for Non-Potable Water Line at Zone K including Branch & Pit POC-NPW/PT3/18, NPW-ISC-0
Inspection for Blinding Concrete under MV Line Junction Pit F/MV/04, F/MV/11, F/MV/06, F/MV/05,
Excavation for MV Line from B/MV/01 TO B/MV/15 and B/MV/23 to G/MV/20 at Zone-B&G including P
Coordinates & Levels of Column's (C3A, 3 no's) of Pargola Footings, at Grid (G/3, 4 & 5), at Manage
Coordinates & Levels of walls for New ticketing booth # 2A, As per Attached Highlighted Drawing's.
Base Seal and Extrusion Aluminum Installation between Axis 02, AS-02, AT.
Inspection & Compaction tests of 7th Layer Backfilling (Sub-Grade) (Out of 9 layers) for Foundation o
Base Seal and Extrusion Aluminum Installation between Axis 02, AQ-02, AR.
Base Seal and Extrusion Aluminum Installation between Axis 02, AR-02, AS.
Concrete Pouring & shuttering for Columns (C3A, 3 no's) of Pargola Footings, at Grid (G/3, 4 & 5),
Concrete pouring & Shuttering for walls of New ticketing booth # 2A, As per Attached Highlighted Dra
Base Seal and Extrusion Aluminum Installation between Axis 02, AP-02, AQ.
Steel Reinforcement for Wall at Grid (14/A-B), inside Butterfly Garden, as highlighted in attached dra
Base Seal and Extrusion Aluminum Installation between Axis 02, AT-02, AU.
Steel Reinfotcmenet for Slab of New Ticketing Booth # 1A, As per Attached Highlighted Drawing's.
Base Seal and Extrusion Aluminum Installation between Axis 02, AU-02, AV.
Base Seal and Extrusion Aluminum Installation between Axis 02, AV-02, AW.
Base Seal and Extrusion Aluminum Installation between Axis 02, AW-02, AX.
Base Seal and Extrusion Aluminum Installation between Axis 02, AX-02, AY.
Base Seal and Extrusion Aluminum Installation between Axis 02, AY-02, AZ.
Inspection and compaction test redsand Cover for Mechanical pipe at LARGE MOSQUE (as Highlighted)
Level and Location for excavation of Blinding and blinding of VIP Auditorium strip footing at Zone 1H ax
Level and Location for Promenade Bridge Abutment wall @ grid M with opening (as highlighted)
Level and Location for Strip Footing between PC 77-79 Zone 1N (as highlighted)
Level and Location for Buttress BOV 44, 45 Zone 1L (as highlighted)
Concreting for MCPE 1 Counter fort and wall (inner) at axis 03-1,03U-03T As highlighted
Concreting for RETAINING WALL (WALL) 1st stage, Axis 01M to 01K (as highlighted) Zone 1D
Anti Termite application under Blinding of VIP Auditorium strip footing at Zone 1H axis E-VA, F-VA, D-E-
Shuttering for Blinding of VIP Auditorium strip footing at Zone 1H axis E-VA, F-VA, D-E-VA, G-VA, 7-VA (a
Shuttering for Promenade Bridge Abutment wall at Grid 1M (as highlighted) (with opening)
Concreting for Promenade Bridge Abutment wall at Grid 1M (as highlighted) (with opening)
Steel Reinforcements for Strip Footing between PC 77-79 Zone 1N (as highlighted)
Shuttering for Strip Footing between PC 77-79 Zone 1N (as highlighted)
Concreting for Strip Footing between PC 77-79 Zone 1N (as highlighted)
Steel Reinforcements for MCPE 2 Columns (C-41 to C-47) at Ground Floor axis 03I to 03I-1 zone 2G, 2H, 2
Excavation for Fire Water Line near Management Building at Zone-F including branch and Pit - F/F/10, F/
Sand Covering Layer for Protection of Telecommunications Line from (B/TL/10 to C/TL/14) at Zone-B as
Sand Covering Layer for Protection of Fire & Security Distribution Line from (B/FS/14 to B/FS/06) at Zo
"INSPECTION FOR INSTALLATION OF ALL RINGS (RISER) AND SLAB FOR MH-K-09 (As Highlighted) "
INSPECTION FOR MANHOLE BASE INSTALLATION AND UPVC PIPE CONNECTION FOR - MH-K-09 (As Highli
"Sand Bedding under pipe for Potable Water Line at Zone-F including branch - as highlighted (Stock Pile
2nd Coat Cementitious Water proofing for Footings top & Walls of Seat Walls (Left Side) (Outer), Insi
1st Coat Cementitious Water proofing for Footings top & Walls of Seat Walls (Right Side) (Outer) for Al
Grouting for Stone Cladding of Boundary wall (Outer Side) at Span 57 & 58, As per Attached Highligh
Primer Coating Prior to Damp proofing for Footings & Walls of Seat Wall (Outer) (Remaining Parts) All
Steel Reinforcement for Precast Panel type 3, as Mockup (Location behind steel workshop) for Butterf
Excavation & Compaction Test for Low Current Lines of Telecom (from MH/ZG/TC/6 to 8) and Fire Alar
Excavation & Compaction Test for Electrical Lines of Low Voltage (from MH/ZG/LV/14 to 16) and Eme
Inspection & Compaction tests of 2nd Layer (Sub-Grade) Backfilling (Out of 6 layers) in Between the Fo
Inspection and Compaction Tests of 10th Layer (Sub Base) Backfilling upto Bottom of Boulders (+878.
Inspection & Compaction tests of Single Layer (Sub-Grade) Backfilling upto Bottom of Blinding (+868
Inspection for Installation of Potable Water Line Isolation Pit G/PW/04, K/PW/04 at Zone- G&K - as highl
"Inspection for Installation of Fire Water Line Isolation Pit K/F/08 at Zone - G - as highlighted "
Inspection & Compaction tests of 3rd Layer (Sub-Grade) Backfilling (Out of 6 layers) in Between the Fo
Inspection & Compaction tests of 8th Layer (Sub-Grade) Backfilling (Out of 8 layers and Final Layer s
Inspection & Compaction tests of 1st Layer (Sub-Grade) Backfilling (Out of 6 layers) in Between the Fo
Inspection & Compaction tests of 2nd (Final) Layer Backfilling (Sub-Grade) (Out of 2 layers)(Upto L
Inspection & Compaction tests of 2nd (Final) Layer Backfilling (Sub-Grade) (Out of 2 layers)(Upto L
Excavation and Bed preparation for water feature lines (part 6) (HDPE dia 250 mm) From entrance of
2nd Coat Damp proofing for Footings & Walls of Seat Walls (Right Side) (Outer) for All sides, Inside P
Grouting for Stone Cladding of Boundary wall (Inner Side) at Span 23 & 24 and Column's C22, C23 & C2
Inspection of Spatter Dash (Rough Coat) Prior to Plastering of Internal Walls inside Passage (GF 500
Plaster Guide Points & Accessories for Plastering of Internal Walls inside Passage (GF 5000 D), Stor
2nd Coat Cementitious Water proofing for Footings top & Walls of Seat Walls (Left Side) (Outer), Insi
2nd Coat Cementitious Water proofing for Foundations, Columns and Walls (All sides) of Internal Fou
Inspection for Installation of Potable Water Line Isolation Pit G/PW/09, G/PW/10, G/PW/11 at Zone- G&K
Inspection for Installation of Fire Water Line Isolation Pit G/F/10, G/F/11, G/F/12 at Zone - G - as highlig
"Inspection and Compaction Test for Backfilling Sub-grade 5th Layer (5 of 5) for excavated trench done
Inspection and Copmaction Test for backfilling Sub-grade 10th Layer (10 of 15) under Cesspool-1 at Zone
Excavation for MV Line Between C/MV/40 TO C/MV/23 at Zone-C including Pit C/MV/40, C/MV/23 - as h
Pre-Assembly Bolt Tightening Inspection of Crescent 02, Zone 4 - 2J Axis 02AE
Pre-Assembly Bolt Tightening Inspection of Crescent 02, Zone 4 - 2K Axis 02AH to 02AE
Bolt Tightening Inspection of Crescent 01, Zone 5 - 1B & Zone 4 - 1C from Axis 01D to 01J
Installation and Survey Report for Location and Levels of Anchor Bolts for RING BEAM Zone 2H (INNER) A
Inspection and compaction test 7th layer Backfill for MCPE 1 Inner wall at Zone 2M 2N Axis 03R - 03T (a
Level and Location for 2 blinding for Foundation of Internal Buildings Zone 1N & 1P (as highlighted)
Level and Location for RING BEAM Zone 2H (INNER) Axis 02-1, 02AB to 02Y (as highlighted)
Level and Location of Slab on grade for Large Mosque ZONE 1G (as highlighetd) at grId (5 to 6 & C to E )
Level and Location for Excavation for Strip Footing Between PC 13-15 Zone 1C (as highlighted)
Anti Termite application under 2 blinding for Foundation of Internal Buildings Zone 1N & 1P (as highligh
Shuttering for 2 blinding for Foundation of Internal Buildings Zone 1N & 1P (as highlighted)
Grouting of Installed Anchor bolt and under Baseplate at Zone 2F OUTER ring beam (as highlighted)
Installation of straight UPVC conduit (5x160mm) for Medium Voltage Ductbank no. HH/D-MV/02
Installation of straight UPVC Conduit (Dia.160mmx5) Medium Voltage Ductbank no. CC/D-MV/11
Installation of straight UPVC Conduit (Dia.160mmx5) Medium Voltage Ductbank no. HH/D-MV/29 (
Installation of straight UPVC Conduit (Dia.75mm) Low Voltage Ductbank (Power & Emergency) connec
Installation of straight UPVC Conduit (Dia.75mm) Fire and Security Ductbank connected to Fire and
Installation of straight UPVC Conduit (Dia.75mm) TELECOM Ductbank connected to TELECOM Handhol
Installation of straight UPVC Conduit (Dia.25mm) and Box for Fire Alarm (Flashing Beacon, Break Gl
Installation of straight UPVC Conduit (Dia.25mm) and Box for Voice and Data (Data, Telephone) at
Installation of straight UPVC Conduit (Dia.25mm) and Box for Fire Alarm (Flashing Beacon) at Mana
Grouting of Installed Anchor bolt and under Baseplate at Zone 2F OUTER ring beam (as highlighted) u
Steel Reinforcements for RING BEAM Zone 2H (INNER) Axis 02-1, 02AB to 02Y (as highlighted), KAIG3
Shuttering for RING BEAM Zone 2H (INNER) Axis 02-1, 02AB to 02Y (as highlighted)
Shuttering for Slab on grade for Large Mosque ZONE 1G (as highlighetd) at grId (5 to 6 & C to E )
Steel Reinforcements for Slab on grade for Large Mosque ZONE 1G (as highlighetd) at grId (5 to 6 & C to
Concrete Pouring for Blinding under Foundation of Boundary wall Span 74 & 75, As per Attached High
Concrete pouring & Shuttering for Grade Beam at Grid (R/1-2), at Management Building, as highlighte
Steel Reinforcement for Grade Beam at Grid (R/1-2), at Management Building, as highlighted area in
Concrete Pouring & Shuttering for Pedestal Column's (08 no's) of Canopy Foundations @ Grids (A/01-0
Coordinates & Levels of Blinding under Foundation of Boundary wall Span 74 & 75, As per Attached H
Coordinates & Levels for Pedestal Column's (08 no's) of Canopy Foundations @ Grids (A/01-08), at Ne
Installation and Fixation of Anchor Bolts and Check Coordinates & Levels for Pedestal Column's (08 no
Check Surface & Levels (after 3 layers of Subgrade Backfilling), Upto B.O.B levels under Foundation
Surface preparation Prior to Backfilling (At Bottom of Blinding level) along Circular Walls (Remaining P
Inspection & Compaction tests of 7th Layer (Sub-Grade) Backfilling (Out of 8 layers) at Behind the Wi
Soil Preparation Prior to Backfilling Between the Foundations (Inner Side), at Grid (A-B/1-8), Inside B
Inspection & Compaction tests of 2nd Layer (Sub-Grade) Backfilling (Out of 6 layers) in Between the Fo
Inspection & Compaction tests of 1st Layer (Sub-Grade) Backfilling (Out of 6 layers) in Between the Fo
Inspection & Compaction Tests of 3rd (Final) Layer Backfilling (Sub Grade) (Out of 3 layers)(Upto B.O
Inspection Of Pipe Installation For Non-Potable Water (Irrigation Line ); (200mmØ- UPVC-Claas-5 );
Excavation for Potable Water Line at Zone-F including branch & Pit - F-PW-15, F/PW/14 - as highlighted
"Inspection and Compaction Test for Backfilling Sub-grade 4th Layer (4 of 5) for excavated trench done
Inspection and Copmaction Test for backfilling Sub-grade 9th Layer (9 of 15) under Cesspool-1 at Zone-K
Inspection for Installation of Potable Water Line Isolation Pit G/PW/05, G/PW/06 at Zone- G - as highlig
Inspection for Installation of Fire Water Line Isolation Pit G/F/07, G/F/08, G/F/09 at Zone - G - as highlig
Inspection and compaction test 5th & 6th layer Backfill for MCPE 1 Inner wall at Zone 2M 2N Axis 03R -
Preliminary Inspection of Erected Steel in Crescent 01, Zone 3 1E from Axis 01M to 01P
Preliminary Inspection of Erected Steel in Crescent 01, Zone 4 1D from Axis 01J to 01M
Installation and Survey Report for Location and Levels of Anchor Bolts for CANOPY @ BII 48 Zone 1M (as
Level and Location for 2nd layer Ground Beam Mass Concrete between PC 78-80 Zone 1N (as highlighte
Level and Location for Infill wall between BI 5-6 Gridline 01E- 01D (As highlighted) ZONE 1B
Level and Location for BUTTRESS (with Beam) BII 48 Zone 1M
Inspection of Installation, Alignment & Bolt Tightening for the Metal Cladding in Crescent 02 Zone 2 –
Level and Location for excavation for VIP Auditorium Foundation (2nd part) at Zone 1H Axis 1-7VA, E to
Level and Location for Bridge to south tower abutments wall foundation at grid 02C Zone 7 (as highlight
Level and Location for MCPE 2 Columns (C-25 to C-40) at Ground Floor axis 03E to 03I zone 2G, 2H, 2J, 2
Shuttering for MCPE 2 Columns (C-25 to C-40) at Ground Floor axis 03E to 03I zone 2G, 2H, 2J, 2K (as hig
Steel Reinforcements for MCPE 2 wall (inner) at axis 03E TO 03I As highlighted
Steel Reinforcement for Bridge to south tower abutments wall foundation at grid 02C Zone 7 (as highlig
Shuttering for Bridge to south tower abutments wall foundation at grid 02C Zone 7 (as highlighted)
Concreting for Bridge to south tower abutments wall foundation at grid 02C Zone 7 (as highlighted)
Shuttering for 2nd layer Ground Beam Mass Concrete between PC 78-80 Zone 1N (as highlighted)
Concreting for 2nd layer Ground Beam Mass Concrete between PC 78-80 Zone 1N (as highlighted)
Shuttering for Infill wall between BI 5-6 Gridline 01E- 01D (As highlighted) ZONE 1B
Shuttering and Shear Connector for BUTTRESS (with Beam) BII 48 Zone 1M
Concreting for BUTTRESS (with Beam) BII 48 Zone 1M
Coordinates & Levels for Kickers of plant room at Maze Garden, at highlighted area in attached drawi
Excavation & Compaction Test for Low Current Lines of Telecom (from MH/ZG/TC/6 to 8) and Fire Alar
Excavation & Compaction Test for Electrical Lines of Low Voltage (from MH/ZG/LV/14 to 16) and Eme
Inspection & Compaction tests of 3rd (Final) Layer Backfilling (Sub-Base) (After 2 layers Sub Grade) f
Excavation & Surface Preparation prior to Blinding under Foundation of Boundary Wall @ Grid (M/27-2
Inspection & Compaction tests of 6th Layer (Sub-Grade) Backfilling (Out of 8 layers) at Behind the Wi
Concrete Pouring & Shuttering for Kickers of plant room at Maze Garden, at highlighted area in attac
1st layer 4mm thk Modified Bituminous Water Proofing Membrane for Footing's & Column's (27 no's) (A
1st layer 4mm thk Modified Bituminous Water Proofing Membrane for Footing's & Column's (18 no's) (A
Protection Layer 4mm thk Bituminous Protection Board for Walls & footings (Outer side) at Grid (A/1-
Single layer 4mm thk Modified Bituminous Water Proofing Membrane for Walls & footings (Outer side)
Solvent Base Primer Coating prior to Membrane Water proofing for Walls & footings (Outer side) at Gr
Concrete Pouring & Shuttering for Stiffner Column's (above lintel upto Final height) for all walls Insid
Steel Reinforcement & Shuttering for Stiffner Column's (above lintel upto Final height) for all walls In
1st Coat Cementitious Water proofing for Foundations, Columns and Walls (All sides) of Internal Fou
Grouting for Stone Cladding of Boundary wall (Inner & Outer Sides) at Span 19, 20 & 21, As per Attac
Grouting for Stone Cladding of Boundary wall (Inner Side) at Span 56 & 57 and Column's C48 & C58 (Al
Inspection & Compaction tests of 5th Layer (Sub-Grade) Backfilling (Out of 8 layers) at Behind the Wi
Inspection of Sand Covering to protect the pipe for Non-Potable Water Line at Zone-B as highlighted i
Soil Preparation Prior to Backfilling Between the Foundations (Inner Side), at Grid (A-B/8-21), Inside
"Inspection and Compaction Test for Backfilling Sub-grade 3rd Layer (3 of 5) for excavated trench done
Inspection and Copmaction Test for backfilling Sub-grade 8th Layer (8 of 9) under Cesspool-1 at Zone-K -
Inspection for Blinding Concrete under Non-Potable Water Line Isolation Pit for NPW-ISC-12, NPW-I
Inspection & Compaction tests of 4th Layer Backfilling (Sub-Grade) (Out of 9 layers) along the Footing
Inspection & Compaction tests of 4th Layer Backfilling (Sub-Grade) (Out of 6 layers), along the Footin
Inspection & Compaction Tests of 2nd Layer Backfilling (Sub Grade) (Out of 3 layers) for Foundation
Inspection & Compaction tests of 6th Layer Backfilling (Sub-Grade) (Out of 9 layers) for Foundation o
Protection Layer 4mm thk Bituminous Protection Board on Waterproofing for Foundations and Walls (Al
Concrete Pouring & Shuttering for Walls of Plant Room, at Physic Garden, at highlighted area in at
Installation of PVC Conduit for Lighting (LED W7, LED B3/CE & EXIT Sign) at the South Small Mosque
Installation of straight UPVC Conduit (Dia. 25mm) for Power System (Cleaner Socket & Socket Outle
Installation of straight UPVC Conduit (Dia.25mm) and Box for Fire Alarm (Speaker & Flashing Beac
Installation of PVC Conduit (Dia.25mm) for Fire Alarm (Flash Beacon, Fire Telephone & Break Glass)
Installation of straight UPVC Conduit (4x110mm) for Low Current (TELECOM) Ductbank no.CB/D-TL/01
Installation of straight UPVC Conduit (2x110mm) for Low Current (Fire and Security) Ductbank no.B
Inspection and compaction test final layer under blinding for Internal Building (2nd part) for Zone 1N A
Level and Location for Blinding of Diaphragm wall strip footing at Zone 2N Axis 02Q (as highlighted) (3rd
Level and Location for Blinding of VIP Auditorium strip footing at Zone 1H axis B-VA, C-VA, D-VA (as high
Grouting of Installed Anchor bolt and under Baseplate at Zone 2H OUTER ring beam (as highlighted)
Shuttering for Blinding of Diaphragm wall strip footing at Zone 2N Axis 02Q (as highlighted) (3rd)
Grouting of Installed Anchor bolt and under Baseplate at Zone 2H OUTER ring beam (as highlighted) u
Steel Reinforcements for MCPE 3 Counter fort wall (inner) at axis 02-R As highlighted
Level and Location for Buttress with Beam BII 40 Zone 1K (as highlighted)
Anti Termite application under Blinding of VIP Auditorium strip footing at Zone 1H axis B-VA, C-VA, D-VA
Shuttering for Blinding of VIP Auditorium strip footing at Zone 1H axis B-VA, C-VA, D-VA (as highlighted)
Coordinates & Levels for Walls of Plant Room, at Physic Garden, at highlighted area in attached dr
Installation of Main Potable Water Pipes (200mmØ-UPVC-Class-5) at Zone-C From Pit - C/PW/01 to C/
Inspection and Compaction Test for backfilling sub-grade 1st Layer (1 of 1) under Potable Water Line Pi
Inspection and Compaction Test for backfilling sub-grade 1st Layer (1 of 1) under Fire Water Line Pit K/
Inspection of Sand bedding under pipe for Potable Water Line at Zone-C including branch - as highlighted
"Inspection and Compaction Test for Backfilling Sub-grade 2nd Layer (2 of 5) for excavated trench done
Inspection and Copmaction Test for backfilling Sub-grade 7th Layer (7 of 9) under Cesspool-1 at Zone-K -
Inspection for Installation of MV Line Junction Pit - B/MV/18 - as highlighted
Inspection and compaction test 17th layer for backfilling of RETAINING WALL (INNER AND OUTER) Zone 1
Inspection and compaction test 4th layer Backfill for MCPE 1 Inner wall at Zone 2M 2N Axis 03R - 03T (a
Level and Location for Promenade Bridge Abutment wall at Grid 1M (as highlighted) (3rd stage)
Level and Location for Buttress with Beam BOI 45 Zone 1L (as highlighted)
Level and Location for RING BEAM Zone 1H (INNER) Axis 01-1, 01AA to 01Z, 01Y to 01W (as highlighted)
Shuttering for Promenade Bridge Abutment wall at Grid 1M (as highlighted) (1m Below opening)
Concreting for Promenade Bridge Abutment wall at Grid 1M (as highlighted) (1m Below opening)
Shuttering and Shear Connector for Buttress with Beam BOI 45 Zone 1L (as highlighted)
Concreting for Buttress with Beam BOI 45 Zone 1L (as highlighted)
Steel Reinforcements & Shear Connector for RING BEAM Zone 1H (INNER) Axis 01-1, 01AA to 01Z, 01Y
Concreting for INFILL WALL between BII 108-109 Gridline 02-1AM- 02-1AN (as highlighted) Zone 2M
1st and 2nd layer of 4mm thick modified bituminous water proofing membrane for Retaining Wall (Wall
Shuttering and Scaffoldings for RING BEAM Zone 1H (INNER) Axis 01-1, 01AA to 01Z, 01Y to 01W (as high
Weld Visual & NDT Inspection for the Baseplate Washer Plates in Crescent 01, Zone 5 1B & Zone 4 1C
Inspection of Installation and Alignment for the Crescent 01 Zone 4 - 1C, From Axis 01G to 01J
Inspection of Installation and Alignment for the Crescent 02 Zone 7 - 2B & 2C, From Axis 02D to 02J
Installation and Survey Report for Location and Levels of Anchor Bolts for RING BEAM Zone 1H (INNER)
Installation of PVC Conduit (Dia. 75mm) and Junction Box for Low Current System at the New Ticket B
Installation of PVC Conduit (Dia. 25mm) and Box for Voice and Data System (DATA, CAM & Telephone)
Installation of PVC Conduit (Dia. 25mm) and Box for Security System (CAM, Door Controller, Magnetic
Installation of PVC Conduit (Dia. 25mm) and Box for Fire Alarm System (Break Glass) at the New Ticke
Installation of straight UPVC Conduit (Dia. 25mm) and Box for Voice and Data (WIFI) at the Infill Wall
Installation of straight UPVC Conduit (Dia.25mm) and Box for Fire Alarm (Speaker) at the Infill Wall A
Inspection for Window and Door openings for New Ticketing Booth # 2A As per Attached Highlighted
Inspection for Installed Storm Water Manhole (MH-D-01-A3), inside Maze Garden, at highlighted area
Inspection & Compaction Tests of 1st Layer Backfilling (Sub Grade) (Out of 3 layers) for Foundation
Inspection & Compaction Tests of 1st Layer Backfilling (Sub Grade) (Out of 2 layers) above Sand Cov
Inspection and Compaction Tests of 5th Layer (Sub Garde) Backfilling (Out of 7 Layers) along the Boun
Grouting for Stone Cladding of Boundary wall (Outer Side) at Span 50A & 56 and Column's C56 & C57 (
Grouting for Stone Cladding of Boundary wall (Outer Side) at Span 49A & 49B, As per Attached Highli
Grouting for Stone Cladding on Column's C15, C16, C17, C18 & C39A (All Sides), As per Attached High
1st Coat Cementitious Water proofing for Footings top & Walls of Seat Walls (Left Side) (Outer), Insid
Protection Layer 4mm thk Bituminous Protection Board on Water Proofing of Foundations and Walls (in
Surface Preparation prior to Water Proofing for Footings & Walls of Seat Wall (Outer) (Remaining Parts
Protection Layer 4mm thk Bituminous Protection Board on Water Proofing for Footings & Walls of Seat
1st Coat Damp proofing for Footings & Walls of Seat Walls (Right Side) (Outer) for All sides, Inside Ph
Inspection of Concrete Pouring for the Footing of SBC-06 - Wing Wall - (As Highlighted)
Inspection of Sand Bedding under pipe for Non-Potable Water Line at Zone K including Branch as highli
"Inspection and Compaction Test for Backfilling Sub-grade 1st Layer (1 of 5) for excavated trench done
Inspection and Copmaction Test for backfilling Sub-grade 6th Layer (6 of 9) under Cesspool-1 at Zone-K -
'Fire Fighting Networks Sand Cover & Pipes Protection (30 cm above Pipes). As per highlighted Area
Installation of Rock and Boulder No. RB-141 - 2nd layer (2 of 5)
Installation and Survey Report for Location and Levels of Anchor Bolts for CANOPY @ BII 46, 47 Zone 1L
Level and Location for TUNNEL 2 Shaft wall at Zone 2F (as highlighted) left of axis 02-1
Level and Location for Buttress with Beam BII 46-47 Zone 1M 1L (as highlighted)
Inspection and compaction test 3rd layer Backfill for MCPE 1 Inner wall at Zone 2M 2N Axis 03R - 03T (a
Level and Location for MCPE 4 GROUND BEARING RC SLAB at Zone 1N (as highlighted) axis 01AO
Level and Location for Diaphragm Wall axis 02R (1st Section as highlighted) upto 3.6M ht. only (Zone 2N
Marking & Check for coordinates of Tree Pits (14 no's) Along Seat Wall (Outer), Inside Physic Garden,
Concrete Pouring & Shuttering for Roof Slabs at Grid (A/8) & (A/14-15), Inside Butterfly Garden, at h
Steel Reinforcement for Columns (C3A, 6 no's) of Pargola Footings, at Grid (G & P/3, 4 & 5), at Ma
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 2 layers) for Sub surfac
Sand Cover and Pipe Protection for Water Feature Lines (part 5-1) (HDPE dia 90 mm) Inside Mist Gard
Check Existing Levels for Base of Boundary wall Span 74 & 75, As per Attached Highlighted Drawing's.
Inspection & Compaction tests of 5th Layer Backfilling (Sub-Grade) (Out of 9 layers) for Foundation o
Inspection of Final Layer backfilling around for SBC-05-Wing Wall - as highlighted
"Inspection and Compaction Test for backfilling Sub-grade 5th Layer (5 of 5) beside Fire Water Line (upt
"Inspection of Concrete Pouring for the Upstand of SBC-08 (Right Side) As Highlighted"
"Inspection of Formwork for the Upstand of SBC-08 (Right Side) As Highlighted"
"Inspection of Concrete Pouring for the Upstand of SBC-06 (Right Side) As Highlighted"
"Inspection of Formwork for the Upstand of SBC-06 (Right Side) As Highlighted"
Inspection for Blinding Concrete under MV Line Pulling Pit G/MV/12, G/MV/16, G/MV/18, K/MV/01, K/M
Inspection for Blinding Concrete under Fire & Security Line Pit B/FS/03, B/FS/04, B/FS/44 at Zone-B - as
Inspection for Blinding Concrete under Telecommunication Line Pit B/TL/48, B/TL/31, B/TL/30, B/TL/51 a
Inspection of Sand Bedding under pipe for Potable Water Line at Zone-G&K including branch - as highlig
Inspection of Sand Bedding under pipe for Fire Water Line at Zone-G&K including branch - as highlighted
Inspection and Copmaction Test for backfilling Sub-grade 5th Layer (5 of 9) under Cesspool-1 at Zone-K -
Inspection and Compaction Test for backfilling sub-grade 1st Layer (1 of 1) under Potable Water Line Pi
Inspection and Compaction Test for backfilling sub-grade 1st Layer (1 of 1) under Fire Water Line Pit G
Inspection for Casting Blinding Concrete under Manhole - MH-K-09 - as highlighted
Inspection for Blinding Concrete under Fire Water Line Pit for G/F/12, G/F/11, G/F/10, G/F/09, G/F/08,
Inspection for Blinding Concrete under Potable Water Line Pit for G/PW/11, G/PW/10, G/PW/04, G/P
Steel Reinforcements for Infill wall between BI 108-109 Gridline 02AM- 02AN (As highlighted)
Steel Reinforcements for Infill wall between BI 5-6 Gridline 01E- 01D (As highlighted) ZONE 1B
Shuttering for TUNNEL 2 Shaft wall at Zone 2F (as highlighted) left of axis 02-1
Concreting for TUNNEL 2 Shaft wall at Zone 2F (as highlighted) left of axis 02-1
Shuttering and Shear Connector for Buttress with Beam BII 46-47 Zone 1M 1L (as highlighted)
Concreting for Buttress with Beam BII 46-47 Zone 1M 1L (as highlighted)
Steel Reinforcements for Tunnel 1 wall part-C (2nd) (as Highlighted) Zone 2H
Two Coat of bituminous Damp proofing coating for RC Ground Beam between PC 80-82 Zone 1N (as High
Protection layer of 4mm thick bituminous protection board for RC Ground Beam between PC 80-82 Zone
Steel Reinforcements for MCPE 4 GROUND BEARING SLAB at Zone 1N (as highlighted) axis 01AO
Shuttering for MCPE 4 GROUND BEARING SLAB at Zone 1N (as highlighted) axis 01AO
Concreting for MCPE 4 GROUND BEARING SLAB at Zone 1N (as highlighted) axis 01AO
Shuttering for Diaphragm Wall axis 02R (1st Section as highlighted) upto 3.6M ht. only (Zone 2N)
Geotextile and Screed under Strip footing between PC 150-152 Zone 2J (as Highlighted)
Surface Preparation and Paint Touch Up Inspection in Crescent 02 Zone 7, 2B & 2C from Axis 02D to 0
Steel Reinforcements for Isolated Columns (C3, C4, D1.1, D2, D3, D4, E1.1) as highlighted at Large Mosq
Repair of Cracks for Gound floor Slab of MCPE 4 (as highlighted) to close SI-S-0025-00
Level and Location for BUTTRESS BIV 46 47 Zone 1L 1M (as highlighted)
Level and Location for RETAINING WALL (WALL) Axis 01G to 01H (as highlighted) Zone 1D
Level and Location for Internal Wall for south Small MOSQUE (as highlighted) elev. 873.15 ZONE 2B, Axis
Inspection and compaction test 2nd layer Backfill for MCPE 1 Inner wall at Zone 2M 2N Axis 03R - 03T (a
Inspection of Alignment for the Installed Baseplates in Crescent 02 Zone 5 - 2H Outer
Inspection of Alignment for the Installed Baseplates in Crescent 02 Zone 6 - 2F Outer
Shuttering for Isolated Columns for south Small MOSQUE (as highlighted) elev. 873.15 ZONE 2B, Axis B2, D
Steel Reinforcements for External Wall for south Small MOSQUE (as highlighted) elev. 873.15 ZONE 2B, Axi
Surface preparation and base primer coating for RC Ground Beam between PC 80-82 Zone 1N (as Highli
Protection layer of 4mm thick bituminous protection board for Strip Footing Between PC 82-84, 79-81 Z
Surfac Preparation and Solvent base primer for Strip Footing Between PC 81 - 83 Zone 1N (as Highlighte
Single layer of 4mm thick modified bituminous waterproofing membrane for Strip Footing Between PC 8
Protection layer of 4mm thick bituminous protection board for Strip Footing Between PC 81 - 83 Zone 1
Shuttering for Internal Wall for south Small MOSQUE (as highlighted) elev. 873.15 ZONE 2B, Axis E, 2-4,
Repair of Cracks for foundation Slab of LARGE MOSQUE (as highlighted) Axis B-E, 2-5 ZONE 1G
Coordinates & Levels for Roof Slabs at Grid (A/8) & (A/14-15), Inside Butterfly Garden, at highlighted
Inspection & Compaction Tests for 1st Layer (Sub Grade) Backfilling (Out of 5 layers) Surround (30 n
Inspection & Compaction Tests for 1st Layer (Sub Grade) Backfilling (Out of 5 layers) Surround (25 n
Sand Bedding (after 5 layers Sub-Grade) for Water Feature Line (Part 6) (HDPE 250 mm) from Water p
Inspection of Plastering (Final Coat) of External Wall Elevation at Grid (10-12/W) at Management Buil
3rd (Final) Coat Cementitious Water proofing for Wing Walls & Upstand wall (Inner Side) of SBC-09, C
2nd Coat Cementitious Water proofing for Wing Walls & Upstand wall (Inner Side) of SBC-09, Connecti
1st Coat Cementitious Water proofing for Wing Walls & Upstand wall (Inner Side) of SBC-09, Connectin
Plaster Guide Points & Accessories Prior to Rough coat of Plastering for Walls all sides of Gents Toilet
Steel Reinforcement for Wall of Plant Room (Remaining Part) Physic Garden, at highlighted area in
Steel Reinfotcmenet for walls of New ticketing booth # 2A, As per Attached Highlighted Drawing's.
Inspection and compaction test 1st layer Backfill for MCPE 1 Inner wall at Zone 2M 2N Axis 03R - 03T (as
Installation and Survey Report for Location and Levels of Anchor Bolts for CANOPY @ BII 44 Zone 1L (as
Level and Location for Promenade Bridge Abutment wall at Grid 1M (as highlighted) (2nd stage)
Level and Location for Buttress with Beam BOI 42, 43, 44 BII 44 Zone 1K 1L (as highlighted)
Steel Reinforcement for Roof Slabs at Grid (A/8) & (A/14-15), Inside Butterfly Garden, as per highl
Shuttering for Promenade Bridge Abutment wall at Grid 1M (as highlighted) (2nd stage)
Steel Reinforcement for Fountain 1 (5 nos) at Physic Garden as highlighted area in attached drawing's
Concreting for Promenade Bridge Abutment wall at Grid 1M (as highlighted) (2nd stage)
Grouting of Installed Anchor bolt and under Baseplate at Zone 2F INNER ring beam (as highlighted) u
Grouting of Installed Anchor bolt and under Baseplate at Zone 2G OUTER ring beam (as highlighted) u
Shuttering and Shear Connector for Buttress with Beam BOI 42, 43, 44 BII 44 Zone 1K 1L (as highlighted)
Concreting for Buttress with Beam BOI 42, 43, 44 BII 44 Zone 1K 1L (as highlighted)
Excavation and Soil Preparation prior to start backfilling sub-grade for Potable Water Line Pit - G//PW/1
Excavation and Soil Preparation prior to start backfilling sub-grade for Fire Water Line Pit - G/F/09 at Zo
Inspection of Sand Bedding under pipe for Potable Water Line at Zone-G including branch - as highlighte
Inspection of Sand Bedding under pipe for Fire Water Line at Zone-G including branch - as highlighted (S
Inspection and Copmaction Test for backfilling Sub-grade 4th Layer (4 of 9) under Cesspool-1 at Zone-K -
"Inspection and Compaction Test for backfilling Sub-grade 4th Layer (4 of 5) beside Fire Water Line (upt
Inspection and Compaction Test for backfilling sub-grade 1st Layer (1 of 1) under Potable Water Li
Inspection and Compaction Test for backfilling sub-grade 1st Layer (1 of 1) under Fire Water Line Pit
Installation of PVC Conduit (Dia.25mm) & Boxes for Power (Fused Connection, Socket Outlet, Thermosta
Installation of PVC Conduit (Dia.25mm) for Power (Fused Connection) at the South Small Mosque (bet
Installation of soil, waste & vent and rain water pipes; CI pipes (50, 75, & 100mmØ) as per high lighte
Installation of Under Ground (65 mmØ- UPVC-Class-5) for Potable Main Line & Gray Water Main Line
Primer Coating Prior to Damp proofing for Footings & Walls of Seat Walls (Right Side) (Outer) for All s
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 3 layers) Inside Outer cano
Inspection of Thrust Block for Irrigation Sub Main line (110, 63 & 50mmØ UPVC-Claas-5 ), from Geyse
Inspection of Thrust Block for Non-Potable Water (Irrigation Line ); (110mmØ UPVC-Claas-5) at Water
Inspection & Compaction Tests for 1st Layer (Sub Grade) Backfilling (Out of 3 layers) Inside Outer Can
Installation of PVC Conduit for Lighting (Scene Switch) at the South Small Mosque (between Column G
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 2 layers and Final layer S
Inspection & Compaction tests of 5th (Final) Layer Backfilling (Sub-Grade) (Out of 5 layers) for Wat
Inspection & Compaction tests of 4th Layer Backfilling (Sub-Grade) (Out of 5 layers) for Foundation o
Coordinates & Levels for Walls of Seat Walls (Outer) (Left Side Remaining Parts), Inside Physic garden
Coordinates & Levels for Screed Protection of Waterproofing on Blinding of Wet Well F, Inside Water
Concrete Pouring & Shuttering for Slab of New Ticketing Booth # 7A As per Attached Highlighted Draw
Installation of Stone Boulder in Wadi-1, Left Side (RB-166) for Layer's (Different Levels) and Square Ar
Surface Preparation prior to start backfilling sub-grade under Potable Water Line Pit G/PW/04, G/
Surface Preparation prior to start backfilling sub-grade under Fire Water Line Pit K/F/08, G/F/12, G/F
Excavation for Foul Water Line from FW-A-3-7.2 to FW-A-3-7.3 including Manhole FW-A-3-7.3 prior to s
"Inspection of Steel Reinforcement for the Upstand of SBC-08 (Right Side) As Highlighted"
"Inspection of Steel Reinforcement for the Upstand of SBC-06 (Right Side) As Highlighted"
Surface Preparation prior to start Backfilling Sub-grade for excavated trench done by previous contracto
"Excavation for Storm Water Line from MH-K-08 to MH-K-09 including Manhole MH-K-09 - As highlighte
Inspection of Water Proofing for the Duct Bank of MV Line from G/MV/24 to G/MV/14 at Zone-G (As Hig
Surface Preparation prior to start water proofing for the Duct Bank of MV Line from G/MV/24 to G/MV/
Inspection and Copmaction Test for backfilling Sub-grade 3rd Layer (3 of 9) under Cesspool-1 at Zone-K -
"Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 5) beside Fire Water Line (up
Installation of straight UPVC Conduit Sleeve (Dia. 75mm & 110mm) for Low Current (ICT & SM Fiber O
Installation of straight UPVC Conduit Sleeve (Dia. 75mm & 110mm) for Low Current (Security & Fire
Installation of straight UPVC Conduit (Dia. 110mm) for Telecommunication Ductbank connected to Te
Installation of straight UPVC Conduit (Dia. 110mm) for Fire & Security Ductbank connected to Fire &
' Warning Tape Installation in pipes(PP Line 600 dia) for Storm Water pipe Out Fall ( Out Fall o to MH-
' Warning Tape Installation in pipes(PP Line 800 dia) for Storm Water pipe Out Fall ( Out Fall o to MH-
' Gravel 3/8" Backfilling and Geotextile in pipes(PP Line 600 dia) for Storm Water pipe Out Fall (Out
' Gravel 3/8" Backfilling and Geotextile in pipes(PP Line 800 dia) for Storm Water pipe Out Fall (Out
Sand Bedding for water feature lines (part 6 Branch) (HDPE dia 250 mm) Inside Geyser Garden, at Wat
Inspection and Compaction Tests of 1st Layer (Sub Garde) Backfilling (Out of 2 Layers) Surround the
Inspection & Compaction tests of One Layer (Sub-base) Backfilling (Upto Level +872.00) (Above Sub Gra
Inspection & Compaction tests of 5th (Final) Layer Backfilling (Sub-Grade) (Out of 5 layers), along
Inspection and Compaction Tests of 4th Layer (Sub Garde) Backfilling (Out of 7 Layers) along the Boun
Inspection & Compaction tests of 4th Layer Backfilling (Sub-Grade) (Out of 5 layers) for Water Feat
Installation of Stone Boulder in Wadi-1, Right Side (RB-167) for Layer's (Different Levels) and Square
Inspection for Blinding Concrete under MV Line Junction Pit for B/MV/19, B/MV/06, B/MV/16, B/MV/
Inspection and Compaction Tests of 9th Layer (Sub Garde) Backfilling (Out of 10 Layers) for Sub sur
Inspection and Copmaction Test for backfilling Sub-grade 2nd Layer (2 of 9) under Cesspool-1 at Zone-K -
Level, Location & Excavation for MCPE 1 8-Isolated Footing at Zone 2M 2N (as highlighted) axis 03R, 03-
Inspection of Sand bedding under pipe for Fire & Security Distribution Line from B/FS/31 to B/FS/04 and
Solvent Base Primer Coating prior to Membrane Water proofing for Footing's & Column's (27 no's) (All
Inspection of Sand bedding under pipe for Telecommunication Line from B/TL/32 to B/TL/30 and B/TL/5
"INSPECTION FOR INSTALLATION OF ALL RINGS (RISER) AND SLAB FOR FW-A-3-7.2 (As Highlighted) "
Level and Location for Ground Beam Mass Concrete between PC 78-80 Zone 1N (as highlighted)
INSPECTION FOR MANHOLE BASE INSTALLATION AND UPVC PIPE CONNECTION FOR - FW-A-3-7.2 (As High
Level and Location of Excavation for Ground Beam Mass Concrete between PC 78-80 Zone 1N (as highli
Solvent Base Primer Coating prior to Membrane Water proofing for Footing's & Column's (18 no's) (All
Inspection of Water Proofing for the Duct Bank of MV Line from F/MV/01 to F/MV/08 at Zone-F (As High
Surface Preparation prior to start water proofing for the Duct Bank of MV Line from F/MV/01 to F/MV/0
Protection layer 4mm thk Bituminous Protection Board for Water Proofing on Foundations, Columns and
Concrete pouring for Screed Protection of Waterproofing on Blinding of Wet Well F, Inside Water Gard
Check Top of Slab Levels (+2950) for New Ticketing Booth # 7A As per Attached Highlighted Drawing's
Inspection and compaction test 15th & 16th layer for backfilling of RETAINING WALL (INNER AND OUTER)
Surface Preparation Prior to start Backfilling at MCPE 1 Internal area at Zone 2N 2M (as highlighted) axi
Surface Preparation and Solvent Base Primer for Retaining Wall (Wall inner and Foundation) (as highlig
Grouting of Installed Anchor bolt and under Baseplate at Zone 1G OUTER ring beam (as highlighted)
Grouting of Installed Anchor bolt and under Baseplate at Zone 1G OUTER ring beam (as highlighted) u
Anti Termite application under MCPE 1 8-Isolated Footing at Zone 2M 2N (as highlighted) axis 03R, 03-3,
Shuttering for Blinding of MCPE 1 8-Isolated Footing at Zone 2M 2N (as highlighted) axis 03R, 03-3, 03-2
Concreting for Blinding of MCPE 1 8-Isolated Footing at Zone 2M 2N (as highlighted) axis 03R, 03-3, 03-2
Anti Termite application under Ground Beam Between PC 78-80 Zone 1N (as highlighted)
Shuttering for Ground Beam Mass Concrete between PC 78-80 Zone 1N (as highlighted)
Concreting for Ground Beam Mass Concrete between PC 78-80 Zone 1N (as highlighted)
Steel Reinforcements for MCPE 3 Counter fort wall (inner) at axis 03-A As highlighted
'Warning Tape Installation of Main Fire Water Pipes (200&250mmØ-UPVC-Class-5). As per highlighted
Weld Visual & NDT Inspection for the Crescent 02, Zone 4 - 2L Axis 02AL to 02AH
Pre-Assembly Bolt Tightening Inspection of Crescent 02, Zone 4 - 2L Axis 02AJ to 02AH
Bolt Tightening Inspection of Crescent 02, Zone 6 - 2D from Axis 02J to 02N
Inspection of Alignment for the Installed Baseplates in Crescent 02 Zone 5 - 2G Outer
Inspection of Alignment for the Installed Baseplates in Crescent 02 Zone 6 - 2F Inner
Concreting for RING BEAM Zone 2G (INNER) Axis 02-1, 02V to 02Y (as highlighted)
Concreting for Infill wall between BII 107-108 Gridline 02AL - 02AM (as highlighted) Zone 2M
Concreting for RING BEAM Zone 2H (OUTER) Axis 02-2, 02Y to 02AB (as highlighted)
Concreting for RING BEAM Zone 2F (OUTER) Axis 02-2, 02V to 02U (as highlighted)
Concreting for RING BEAM Zone 1G (INNER) Axis 01-1E, 01S to 01W (as highlighted)
Inspection of Block Work Upto Lintel height at Grid (9/B-E, F), Inside Management Building, As per Hi
Inspection of Spatter Dash (Rough Coat) Prior to Plastering of External Wall Elevation at Grid (10-12
Protection Layer 4mm thk Bituminous Protection Board on Water Proofing on Foundations and Walls (inn
Single layer 4mm thk Modified Bituminous Water Proofing Membrane on Foundations and Walls (inner s
Geo Textile on Blinding of Wet Well F, Inside Water Garden as highlighted area in attached drawing's.
1st Layer Gravel Backfilling Surround the Manholes (3 nos) (MH-D-07-01), (MH-D-07-02) and (MH-D-07-
Sand Bedding for Low Current Lines of Telecom (from MH/SG/TC/1-2-3-4-5 to 6) and Fire Alarm & Secu
Sand Bedding for Electrical Lines of Low Voltage (from MH/SG/LV/6-4 to 5) and Emergency (from MH/S
Inspection and Compaction Tests of 8th Layer (Sub Garde) Backfilling (Out of 10 Layers) for Sub sur
Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Grade) (Out of 5 layers) for Foundation o
Installation of PVC conduit (Dia. 25mm) for Fire Alarm (Flashing Beacon, Fire Telephone & Fire Alarm
Installation of straight UPVC conduit Sleeve (Dia. 75mm & 160mm) for (Submain Cables, Emergency Li
Installation of UPVC conduit for Power (Socket Outlet & Fusd Connection) at the South Small Mosque
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 2) above Sand Covering for
Inspection and Copmaction Test for backfilling Sub-grade 1st Layer (1 of 9) under Cesspool-1 at Zone-K -
Surface Preparation prior to start Waterproofing for SBC-06- Footing and wall of Wing Wall - as highligh
Inspection and Compaction Test for backfilling Sub-grade 4th Layer (4 of 8) around SBC-09 - Wing Wall (L
"Inspection and Compaction Test for backfilling sub-grade 8th Layer (8 of 8) around SBC-05 as highlig
Bolt Tightening Inspection of Aviary Garden from Grid Line 01 to 16
Inspection of Installation and Preliminary Alignment for the Aviary Garden from Grid Line 01 to 23
Pipe Installation of Sub-Surface Drainage Perforated Pipes ; (110mmØ, UPVC-CLASS-4) ; As per High
'Fire Fighting pipes Sand Cover & Pipes Protection (30 cm above Pipes). As per highlighted Area in th
Installation of Main Potable Water Pipes (200mmØ-UPVC-Class-5) at Zone-C,H,L including branch
Inspection and compaction test 13th & 14th layer for backfilling of RETAINING WALL (INNER AND OUTER)
Inspection and compaction test 11th & 12th layer for backfilling of RETAINING WALL (INNER AND OUTER)
Level and Location for excavation for VIP Auditorium Foundation (1st part) at Zone 1H Axis 1-7VA, B-DVA
Level and Location for for Isolated Columns for south Small MOSQUE (as highlighted) elev. 873.15 ZONE 2B
Level and Location of Staircase, Shaft Opening & ground beam for Large Mosque ZONE 1G (as highlighetd)
Steel Reinforcements for Staircase, Shaft Opening & ground beam for Large Mosque ZONE 1G (as highligh
Shuttering for Staircase, Shaft Opening & ground beam for Large Mosque ZONE 1G (as highlighetd) at gri
Surface Preparation for Retaining Wall Foundation (as highlighted) Zone 1D, axis 01G TO 01J
Surface Preparation for Retaining Wall (Wall inner ad outer) (as highlighted) Zone 1D, axis 01G TO 01J
Shuttering for Blinding of MCPE 4 GROUND BEARING SLAB at Zone 1N (as highlighted) axis 01AO
Concreting for Blinding of MCPE 4 GROUND BEARING SLAB at Zone 1N (as highlighted) axis 01AO
Protection layer of 4mm thick bituminous protection board for MCPE 1 inner Wall to 871.00 (as highli
Surface Preparation and Solvent base primer for MCPE 1 Wall (as highlighted) Zone 2N 2M, axis 03R, 03-
Two Layer of 4mm thick modified bituminous waterproofing membrane for MCPE 1 Wall (as highlighted)
Protection layer of 4mm thick bituminous protection board for MCPE 1 Wall (as highlighted) Zone 2N 2M
Geotextile and Screed under Strip footing between PC 77-79 (as highlighted) Zone 1N
Installation and Survey Report for Location and Levels of Anchor Bolts for RING BEAM Zone 2G (INNER) A
Weld Visual & NDT Inspection for the Baseplate Washer Plates in Crescent 02, Zone 6 2D.
Inspection of Installation and Alignment for the Crescent 02 Zone 6 - 2D, From Axis 02J to 02N
Inspection of Installation and Alignment for the Crescent 02 Zone 7 - 2B & 2C, From Axis 02D to 02J
Grouting for Stone Cladding of Boundary wall (Inner Side) at Span 37 & 38 and Column's C37 & C38A (A
Grouting for Stone Cladding of Boundary wall (Inner Side) at Span 35 & 36 and Column's C35 & C36 (Al
Grouting for Stone Cladding of Boundary wall (Inner Side) at Span 27 & 28 and Column's C27 & C27A (A
Grouting for Stone Cladding of Boundary wall (Inner Side) at Span 25 & 26 and Column's C24A, C25 & C
Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Grade) (Out of 5 layers) for Water Feat
Surface preparation Prior to Backfilling Surround the Manholes (3 nos) (MH-D-07-01), (MH-D-07-02) a
Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Grade) (Out of 9 layers) along the Footing
Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Grade) (Out of 6 layers), along the Footin
Excavation and Bed preparation for water feature lines (part 6 Branch) (HDPE dia 250 mm) Inside Gey
Gravel 3/8 Bedding & Geotextile Surround for Sub surface Branch Pipe lines (160mm & 110mm) Conne
Inspection and Compaction Tests of 7th Layer (Sub Garde) Backfilling (Out of 10 Layers) for Sub sur
Inspection and Compaction Tests of 2nd (Final) Layer (Sub Garde) Backfilling (Out of 2 Layers)(Upto
Single layer 4mm thk Modified Bituminous Water Proofing Membrane on Blinding of Wet Well F, Insid
Plantation of Steel Rebars using Epoxy Grout for Connection of Wall & Top Slabs Reinforcements at
Drilling & Cleaning Prior to Steel Plantation for Connection of Wall & Top Slabs at Grid (A/7-8) & (A
HDPE Pipe Installation of Water Features pipes; (90mmØ CLASS-PE100); As per High lighted Attache
Pipe Installation for Showres Drain ( 50, 75mmØ - CI Pipe) According to the Last Approved ARCH Dra
'Pipe Installation of Strom Water pipe OUT FALL-O for (PP Line 800 dia) for Storm Water pipe Out Fal
'Bedding of Gravel 3/8" and Geotextile surrounding in pipes(PP Line 800 dia) for Storm Water pipe Out
Pipe Installation of Sub-Surface Drainage (Main Line & Branches) Perforated Pipes ; (110 &160 mmØ
Excavation for Potable Water Line at Zone-G&K including branch & Pit - PW-01, G/PW/06, G/PW/05,
Excavation for Fire Water Line at Zone-G&K including branch and Pit - K/F/08, G/F/12, G/F/11, G/F/10, G
Inspection for Blinding Concrete under MV Line Junction Pit for C/MV/02, B/MV/17, B/MV/18, B/MV/07
"Inspection for Casting the Blinding Concrete under the Manhole for FW-A-3-7.2 (as Highlighted)"
"Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 2) beside Fire Water Line (up
"Inspection of Sand bedding under pipe for Non-Potable Water Line at Zone K as highlighted in the att
Surface Preparation prior to start backfilling Sub-grade under Cesspool-1 at Zone-K - as highlighted
"INSPECTION FOR INSTALLATION OF ALL RINGS (RISER) AND SLAB FOR MH-K-08 (As Highlighted) "
"INSPECTION FOR INSTALLATION OF ALL RINGS (RISER) AND SLAB FOR FW-A-3-7.1 (As Highlighted) "
"Excavation for Non-Potable Water Line at Zone K including Branch & Pit POC-NPW/PT3/18 and POC-45
Installation of UPVC Conduit (Dia.25mm) & Boxes for Lighting (Lighting Fixture) at the New Ticket Boo
Installation of stub-up UPVC Conduit (Dia.32mm) for Fire Alarm (Speaker) at the wall Physic Garden a
Level and Location for excavation & Blinding of Diaphragm wall strip footing at Zone 2N Axis 02Q (as hi
Level and Location for RING BEAM Zone 2G (INNER) Axis 02-1, 02V to 02Y (as highlighted)
Level and Location for MCPE 4 GROUND BEARING SLAB at Zone 1N (as highlighted) axis 01AO
Surface Preparation and Solvent Base Primer Coating under Strip footing between PC 77-79 (as highligh
Steel Reinforcements & Shear Connector for RING BEAM Zone 2G (INNER) Axis 02-1, 02V to 02Y (as hi
Single layer of 4mm thick modified bituminous water proofing membrane under Strip footing between P
Shuttering and Scaffoldings for RING BEAM Zone 2G (INNER) Axis 02-1, 02V to 02Y (as highlighted)
2nd layer of 4mm thick modified bituminous waterproofing membrane for MCPE 1 inner Wall to 871.00
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 2 layers and Final layer Su
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 5 layers) for Foundation o
Coordinates and levels for Kickers of Plant Room (Remaining Part) at Physic Garden, at highlighted
Coordinates & Levels for Walls of Seat Walls (Outer) (Both Remaining Parts), Inside Physic garden, as
Coordinates & Levels of Footings for Pargola (6 no's), at Grid (G & P/3, 4 & 5), at Management Buil
Coordinates & Levels of Fountain 1 (5 nos) inside Physic Garden as highlighted in attached drawing's.
Concrete pouring & Shuttering for Kickers of Plant Room (Remaining Part) at Physic Garden, at high
Concrete Pouring & Shuttering for Walls of Seat Walls (Outer) (Both Remaining Parts), Inside Physic g
Concrete Pouring & Shuttering for Footings of Pargola (6 no's), at Grid (G & P/3, 4 & 5), at Manage
Steel Reinforcement for Footings of Pargola (6 no's), at Grid (G & P/3, 4 & 5), at Management Build
Concrete Pouring & Shuttering for Fountain 1 (5 nos) inside Physic Garden as highlighted in attached
Solvent Base Primer Coating prior to Membrane Water proofing on Blinding of Wet Well F, Inside Wate
Surface Preparation prior to Water proofing on Blinding of Wet Well F, Inside Water Garden as highli
Grouting for Stone Cladding of Boundary wall (Inner Side) at Span 23 & 24 and Column's C22, C23 & C2
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 2) above Sand Covering for N
Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 8) around SBC-09 - Wing Wall (R
"Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 2) besdie Fire Water Line (upt
Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 8) around SBC-09 - Wing Wall (L
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 3) beside Telecommunication
Excavation for Foul Water Line from FW-A-3-7.1 to FW-A-3-7.2 including Manhole FW-A-3-7.2 prior to s
"Inspection for Installation of MV Line Junction Pit - B/MV/26, G/MV/05, G/MV/17- as highlighted "
Excavation for Fire & Security Distribution Line from B/FS/31 to B/FS/04 and B/FS/44, including Pit B/
Excavation for Telecommunication Line between B/TL/32 to B/TL/30 and B/TL/51 including pit B/TL/30,
Installation and Survey Report for Location and Levels of Anchor Bolts for CANOPY @ BII 42, 43 Zone 1K
Level and Location for Buttress with Beam BII 42 43 Zone 1K 1L (as highlighted)
Steel Reinforcements for Internal Wall for south Small MOSQUE (as highlighted) elev. 873.15 ZONE 2B, Ax
Shuttering for Blinding of Diaphragm wall strip footing at Zone 2N Axis 02Q (as highlighted) (2nd)
Level & Location for Blinding of SOG for Large Mosque ZONE 1G (4th) (as highlighetd) at grad (D-F & 5-6
Anti Termite application under Blinding of SLAB ON GRADE OF LARGE MOSQUE at Zone 1G (as highlighted
Shuttering for Blinding of SOG for Large Mosque ZONE 1G (4th) (as highlighetd) at grid (D-F & 5-6 )
Grouting for Stone Cladding of Boundary wall (Inner Side) Span 33 & 34 and Column's C33 & C34 (All S
Grouting for Stone Cladding of Boundary wall (Inner Side) Span 31 & 32 and Column's C31 & C32 (All S
Grouting for Stone Cladding of Boundary wall (Inner Side) Span 29 & 30 and Column's C28, C29 & C30 (
Surface preparation prior to Water proofing for Footing's & Column's (27 no's) (All sides) @ Jetty 2,
Surface preparation prior to Water proofing for Footing's & Column's (18 no's) (All sides) @ Jetty 1,
Surface Preparation prior to Water Proofing for Footings & Walls of Seat Walls (Right Side) (Outer) for
Sand Bedding for Water Feature Lines (part 5-1) (HDPE dia 90 mm) Inside Mist Garden, at Water Garde
Inspection & Compaction tests of 4th Layer Backfilling (Sub-Grade) (Out of 5 layers)(After 2 layers
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 5 layers) for Water Feat
Excavation & Bed preparation for Low Current Lines of Telecom (from MH/SG/TC/1-2-3-4-5 to 6) and F
Excavation & Bed preparation for Electrical Lines of Low Voltage (from MH/SG/LV/6-4 to 5) and Emer
Shuttering and Shear Connector for Buttress with Beam BII 42 43 Zone 1K 1L (as highlighted)
Concreting for Buttress with Beam BII 42 43 Zone 1K 1L (as highlighted)
"Excavation for Non-Potable Water Line at Zone K For Branch & Pit ISC-05 as highlighted in the attac
Surface Preparation prior to backfilling gravel for the Duct Bank of Telecommunications Line from G/TL/
Surface Preparation prior to start backfilling Gravel for the Duct Bank of Fire & Security Distribution L
Inspection for Blinding Concrete under MV Line Pulling Pit B/MV/26, G/MV/17, G/MV/05 - as highlighted
Inspection for application of 1 Coat Primer, Damp Proof (1st Coat & 2nd Coat) and Protection Board for
INSPECTION FOR MANHOLE BASE INSTALLATION AND UPVC PIPE CONNECTION FOR - MH-K-08 (As Highli
INSPECTION FOR MANHOLE BASE INSTALLATION AND UPVC PIPE CONNECTION FOR - FW-A-3-7.1 (As High
Inspection of Concrete (Plain) Pouring for the Duct Bank of MV Line from C/MV/05 to C/MV/30 at Zone-
Inspection of Alignment for the Installed Baseplates in Crescent 01 Zone 3 - 1G Inner
Level and Location for Excavation for Strip Footing Between PC 16-18, 20-22 Zone 1C 1D (as highlighted)
Inspection of 4th layer backfilling Beside of Retaining wall between Axis 01AK TO 01AI Zone 1 (4th of 4t
Surface Preparation and Solvent base primer under Foundation of Bridge to south tower abutment grid
Two layers of 4mm thick modified bituminous water proofing under Foundation of Bridge to south towe
Cementitious water proofing under Foundation of Bridge to south tower abutment grid 02C as highlight
Protection layer of 4mm thick bituminous protection board under Foundation of Bridge to south tower
1st & 2nd layer of 4mm thick modified bituminous waterproofing membrane for MCPE 1 inner top of fo
Steel Reinforcements for Diaphragm Wall axis 02R (1st Section as highlighted) upto bottom of Beam Zo
Grouting of Installed Anchor bolt and under Baseplate at Zone 2E INNER & OUTER ring beam (as high
Grouting of Installed Anchor bolt and under Baseplate at Zone 2E INNER & OUTER ring beam (as highl
Installation of straight UPVC Conduit (4x110mm) for Low Current (TELECOM) Ductbank no.CB/D-TL/0
Installation of straight UPVC Conduit (2x110mm) for Low Current (Fire and Security) Ductbank no.B
Inspection and Compaction Tests of 6th Layer (Sub Garde) Backfilling (Out of 10 Layers) for Sub sur
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 5 layers) for Foundation o
Inspection of Installed Low Current Handholes of Fire Alarm & Security (MH/SG/FA/01-12) and Teleco
Inspection of Installed Electrical Handholes of Low Voltage (MH/SG/LV/01-12), Emergency (MH/SG/EM/
Inspection of Installed Storm Water Manholes (3 nos) (MH-D-07-01), (MH-D-07-02) and (MH-D-07-01-01
Steel Reinforcement for Fountain 1 (1 no at Left side of Outer Canopy 3), at Physic Garden as highligh
Concrete Pouring & Shuttering for Pedestal Column's (08 no's) of Canopy Foundations @ Grids (B/01-0
Concrete pouring for Blinding under foundation of Wet Well F, Inside Water Garden as highlighted are
Coordinates & Levels for Pedestal Column's (08 no's) of Canopy Foundations @ Grids (B/01-08), at Ne
Coordinates and Levels of Blinding for Wet Well F, Inside Water Garden as highlighted area in attache
'Pipe Installation of Strom Water pipe OUT FALL-Y for (PP Line 600 dia) & (200&315 mm Ø- UPVC Pipes-
'Bedding of Gravel 3/8" and Geotextile surrounding in pipes(PP Line 600 dia) & (200&315 mm Ø- UPVC P
Inspection and compaction test 3rd layer for MCPE 1 external area at Zone 2N 2M (as highlighted) axis 0
Weld Visual & NDT Inspection for the Baseplate Washer Plates in Crescent 02, Zone 7 2B & 2C
Surface Preparation and Paint Touch Up Inspection in Crescent 02 Zone 3, 2N & 2M from Axis 02AT t
Weld Visual & NDT Inspection for the Crescent 01, Zone 3 - 1E Axis 01N to 01P
Inspection of Alignment for the Installed Baseplates in Crescent 01 Zone 3 - 1G Outer
Level and Location of Slab on grade for Large Mosque ZONE 1G (as highlighetd) at grad (2 to 5 & C1 to F
Level and Location for Buttress BIV 49 Zone 1M (as highlighted)
Level and Location for Buttress with Beam BOI 50 51 Zone 1M 1N (as highlighted)
Level and Location for MCPE 2 Wall between Axis 02AB to 02AA (as highlighted) (871.00)
Shuttering and Shear Connector for Buttress BIV 49 Zone 1M (as highlighted)
Concreting for Buttress BIV 49 Zone 1M (as highlighted)
Shuttering and Shear Connector for Buttress with Beam BOI 50 51 Zone 1M 1N (as highlighted)
Concretingfor Buttress with Beam BOI 50 51 Zone 1M 1N (as highlighted)
Shuttering for MCPE 2 Wall between Axis 02AB to 02AA (as highlighted) (871.00)
Concreting for MCPE 2 Wall between Axis 02AB to 02AA (as highlighted) (871.00)
Shuttering for Slab on grade for Large Mosque ZONE 1G (as highlighetd) at grad (2 to 5 & C1 to F )
Stone Cladding for Boundary wall at Elevation " I " (All Sides) @ Sound & Light Garden, As per Attach
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 5 layers) for Water Featu
Inspection and Compaction Tests of 5th Layer (Sub Garde) Backfilling (Out of 10 Layers) for Sub sur
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 9 layers) along the Footing
Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Grade) (Out of 5 layers)(After 2 layers
Inspection & Compaction Tests after Excavation and Check Levels prior to Blinding of wet well ( F ), a
Surface preparation prior to Stone Cladding for Light walls A & B (All Sides) @ Sound & Light Garden,
Setting out of Groove Installation for External Elevations at Site Tower 2, as per the attached Drawing
Installation and Fixation of Anchor Bolts and Check Coordinates & Levels for Pedestal Column's (08 no
2nd Coat Damp proofing for Footings & Walls of Seat Walls (Left Side) (Outer), Inside Physic garden,
Protection layer 4mm thk Bituminous Protection Board for Water Proofing Membrane on Side face of F
Single layer 4mm thk Modified Bituminous Water Proofing Membrane on Side face of Foundation of Wet
Inspection of alignment for the installed baseplates in Crescent 02 Zone 6 - 2E
Inspection and compaction test 10th layer for backfilling of RETAINING WALL (INNER AND OUTER) Zone 1
Steel Reinforcements for Isolated Columns for south Small MOSQUE (as highlighted) elev. 873.15 ZONE 2
Steel Reinforcements for Isolated Circular Columns for CAFETERIA (as highlighted) elev. 869.10 ZONE 2A
Steel Reinforcements for Slab on grade for Large Mosque ZONE 1G (as highlighetd) at grad (2 to 5 & C1 t
Concreting for Buttress BOV, BIV 46, 47 Zone 1L 1M (as highlighted)
Concreting for RING BEAM Zone 2F (OUTER) Axis 02-2, 02T to 02R (as highlighted)
Concreting for Buttress with Beam BIV 41 Zone 1L (as highlighted)
Solvent Base Primer Coating prior to Membrane waterproofing on Side face of Foundation of Wet well
Surface Preparation Prior to Water proofing on Side face of Foundation of Wet well E, at Grid (A/1-2
Geo Textile on Blinding of Wet well E, inside Water Garden, As per Attached Highlighted Drawing's.
Protection layer 4mm thk Bituminous Protection Board for Water Proofing on Blinding of Wet well E,
Single layer 4mm thk Modified Bituminous Water Proofing Membrane on Blinding of Wet well E, insi
Solvent Base Primer Coating prior to Membrane waterproofing on Blinding of Wet well E, inside Wate
Sand Cover and Pipe Protection for Water Feature Line (Part 6) (HDPE 250 mm) from Water play Garde
Sand Bedding for Water Feature Lines (part 5-1) (HDPE dia 90 mm) Inside Mist Garden, at Water Garde
Plaster Guide Points & Accessories for Plastering of External Wall Elevation at Grid (10-12/W) at Man
Installation of UPVC Conduit (Dia. 25mm) and Box for Fire Alarm System (Smoke Detector & Voice Ala
"Inspection of Reinforced Concrete Pouring for Duct Bank of Fire & Security line between B/RC-FS/38
Inspection for Casting Blinding Concrete under Manhole - MH-Y-01, MH-Y-02 - as highlighted
Inspection for Casting Blinding Concrete under Manhole - MH-O-01 - as highlighted
"Inspection for Casting the Blinding Concrete under the Manhole for FW-A-3-7.1 (as Highlighted)"
Inspection for Casting Blinding Concrete under Manhole - MH-K-08 - as highlighted
Inspection of Concrete Pouring for the Wall of SBC-08 - Wing Wall (Right Side) - As Highlighted
Inspection of Formwork for the Wall of SBC-08 - Wing Wall (Right Side) - As Highlighted
"Inspection and Compaction Test for backfilling sub-grade 7th Layer (7 of 8) around SBC-05 as highlig
Inspection of Sand Covering to protect the pipe for Non-Potable Water Line fromThrust Block to Thrust
Surface preparation and Compaction at blinding level of Electrical Handholes of Emergency (MH/WG
Inspection and Compaction Tests of 4th Layer (Sub Garde) Backfilling (Out of 10 Layers) for Sub sur
Inspection for Installed Electrical Handholes of Low Voltage (MH/WG/LV/44 to 47) and Emergency (M
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 5 layers)(After 2 layers
Excavation and Bed preparation for water feature lines (part 5-1) (HDPE dia 90 mm) Inside Mist Garde
Excavation and Bed preparation for Sub surface Branch Pipe lines (160mm & 110mm) Connected to Ma
2nd Coat Cementitious Water proofing for Foundations and Walls (All sides) of Circular Walls (Remain
Concrete Pouring for Screed protection on Water proofing for wet area Inside Shower Area (GF-5087)
Geo textile Layer after Membrane Water proofing for wet area Inside Shower Area (GF-5087) and Toi
1st Coat Damp proofing for Footings & Walls of Seat Walls (Left Side) (Outer), Inside Physic garden, a
Protection Layer 4mm thk Bituminous Protection Board on Waterproofing for Foundation & wall of Sea
Steel Reinforcement for Walls of Seat Walls (Outer) (Remaining Parts), Inside Physic garden, as highl
2nd Coat Damp proofing for Foundations and Walls (All sides) of Circular Walls (Remaining Part), Insi
Installation and Survey Report for Location and Levels of Anchor Bolts for RING BEAM Zone 1H (OUTER)
Level and Location for RING BEAM Zone 1H (OUTER) Axis 01-2, 01W to 01AA (as highlighted)
Inspection of 3rd layer backfilling Beside of Retaining wall between Axis 01AK TO 01AI Zone 1 (3rd of 4t
Inspection and compaction test final layer for backfilling under slab on grade blinding of LARGE MOSQU
Shuttering and Scaffoldings for RING BEAM Zone 1H (OUTER) Axis 01-2, 01W to 01AA (as highlighted)
Steel Reinforcements & Shear Connector for RING BEAM Zone 1H (OUTER) Axis 01-2, 01W to 01AA (as
Protection layer of 4mm thick bituminous protection board spot bonded for wall (inner) wall (mid to top
Geotextile and Screed for Retaining wall (inner) foundation at axis 01AP to 01AJ (as highlighted)
Surface Preparation and Solvent Base Primer for wall (inner) wall (mid to top of wall) at axis 01AR to 0
Two layers of 4mm thick modified bituminous waterproofing membrane with polyester for wall (inner) wa
Concreting for Buttress with Beam BII 40 Zone 1K (as highlighted)
Shuttering and Shear Connector for Buttress with Beam BII 40 Zone 1K (as highlighted)
Excavation for Foul Water Line from FW-A-3-7 to FW-A-3-7.1 including Manhole FW-A-3-7, FW-A-3-7.1 p
"Excavation for Storm Water Line from MH-K-07 to MH-K-08 including Manhole MH-K-07, MH-K-08 - As
Inspection of Concrete (Plain) Pouring for the Duct Bank of MV Line from B/MV/08 to C/MV/04 at Zone
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 8) around SBC-09 - Wing Wall (R
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1of 2) beside Fire & Security Distr
Bolt Tightening of Aviary Garden from Grid Line 01 to 16 as per the highlighted area in the attached
Water Test after Bitumenous Water proofing Membrane for wet area Inside Toilets (GF-5061, 5062
Inspection & Compaction tests of 4th Layer Backfilling (Sub-Grade) (Out of 5 layers), along the Boun
Inspection & Compaction Tests of 4th (Final) Layer Backfilling (Sub Grade) (Out of 4 layers) for wet we
Inspection and Compaction Tests of 3rd Layer (Sub Garde) Backfilling (Out of 10 Layers) for Sub sur
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 9 layers) along the Footing
Inspection and Compaction Tests of 3rd Layer (Sub Garde) Backfilling (Out of 7 Layers) along the Boun
Single layer 4mm thk Modified Bituminous Water Proofing Membrane for Foundation & wall of Seat wal
Steel Reinforcement for Walls of Wet Well (E), Inside Water Garden as highlighted area in attached dr
1st Coat Damp proofing for Foundations and Walls (All sides) of Circular Walls (Remaining Part), Insi
Single layer 4mm thk Modified Bituminous Water Proofing Membrane on Foundations, Columns and Walls
Installation of Cable Tray for Emergency (CT25-100mm from grid no. 16F to 16Q) at the Management
Installation of Cable Tray for Low Voltage (CT6-100mm from grid no. 16G to 16Q) at the Management
Inspection and compaction test of 6th (Subgrade) for Beside of Retaining wall Axis 01AJ TO 01AL Zone 1
Inspection of 1st & 2nd layer backfilling Beside of Retaining wall between Axis 01AK TO 01AI Zone 1 (1s
Level and Location for Buttress BIV 45 Zone 1L (as highlighted)
Concreting for BUTTRESS BIV 45 Zone 1L
Shuttering and Shear Connector for BUTTRESS BIV 45 Zone 1L
Steel Reinforcements for MCPE 3 Columns (C17 - C18 - C19 - C20 - C21) at Ground Floor axis 02R to 02S,
1st layer of 4mm thick modified bituminous waterproofing membrane for MCPE 1 inner Wall to 871.00
Surface Preparation and Solvent Base Primer for MCPE 1 inner Wall to 871.00 (as highlighted) Zone 2N
Installation and Survey Report for Location and Levels of Anchor Bolts for CANOPY @ BII 40 Zone 1K (as
Inspection of Installation, Alignment & Bolt Tightening for the Metal Cladding in Crescent 02 Zone 2 –
Inspection of Installation, Alignment & Bolt Tightening for the Metal Cladding in Crescent 02 Zone 3
Pre-Assembly Bolt Tightening Inspection of Crescent 01, Zone 4 1C & 1D Axis 01H to 01M as per the h
Inspection of Installation, Alignment & Bolt Tightening for the Metal Cladding in Crescent 02 Zone 3 -
Concrete Pouring & Shuttering for Footings of Seat Walls (Left Side) (Outer) (Remaining Part), Inside
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1of 2) beside Telecommunication Li
Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 3) around Fire Water Line Pit
Inspection and Compaction test for backfilling Sub-grade 3rd Layer (3 of 3) around Potable Water Line P
Surface Preparation prior to start Waterproofing for SBC-02 Upstand, Footing and wall of Wing Wall - as
"Inspection and Compaction Test for backfilling sub-grade 6th Layer (6 of 8) around SBC-05 as highlig
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 8) around SBC-09 - Wing Wall (L
Bolt Tightening Inspection of Butterfly Garden from Axis 01 - 21
Bolt Tightening Inspection of Crescent 02, Zone 7 - 2B & 2C from Axis 02D to 02J
Pre-Assembly Bolt Tightening Inspection of Crescent 02, Zone 4 - 2L Axis 02AL & 02AK
Surface Preparation and Paint Touch Up Inspection in Crescent 02 Zone 3, 2N & 2M from Axis 02AT t
Inspection of 1st & 2nd layer (out of 2) (Red sand) backfilling Beside of Retaining wall between Axis 0
Level and Location for Infill wall between BII 107-108 Gridline 02AL - 02AM (as highlighted) Zone 2M
Level & Location for Blinding of SOG for Large Mosque ZONE 1G (3rd) (as highlighetd) at grad (C-E & 5-6
Shuttering for Blinding of SOG for Large Mosque ZONE 1G (3rd) (as highlighetd) at grid (C-E & 5-6 )
Shuttering for Infill wall between BII 107-108 Gridline 02AL - 02AM (as highlighted) Zone 2M
Grouting of Installed Anchor bolt and under Baseplate at Zone 2J 2K INNER ring beam (as highlighted)
Anti Termite application under Blinding of SLAB ON GRADE OF LARGE MOSQUE at Zone 1G (as highlighted)
Grouting of Installed Anchor bolt and under Baseplate at Zone 2J 2K INNER ring beam (as highlighted
Weld Visual & NDT inspection for the Crescent 01, Zone 4 - 1D Axis 01M & Zone 3 -1E Axis 01M (as hi
Surface Preparation and Paint Touch Up Inspection in Crescent 02 Zone 2, 2Q & 2P from Axis 02AZ to
1st Coat Cementitious Water proofing for Foundations and Walls (All sides) of Circular Walls (Remaini
Steel Reinforcement for Fountain 1 (5 nos) at Physic Garden as highlighted area in attached drawing's
Primer Coating Prior to Damp proofing for Footings & Walls of Seat Walls (Left Side) (Outer), Inside P
Inspection & Compaction Tests of 3rd Layer Backfilling (Sub Grade) (Out of 4 layers) for wet well ( F )
Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Grade) (Out of 5 layers), along the Plant
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 3 layers) Inside Outer cano
Inspection and Compaction Tests of 2nd Layer (Sub Garde) Backfilling (Out of 10 Layers) for Sub sur
Installation of straight UPVC Conduit (Dia.25mm ) for Fire Alarm (Microphone) at Large Mosque (betwe
Installation of Cable Tray and Trunking for Low Current (LC5- 600mm grid no.15/F to 15P,15P to 1
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1of 2) beside Telecommunication L
"Inspection and Compaction Test for backfilling sub-grade 5th Layer (5 of 8) around SBC-05 as highlig
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 3) around Fire Water Line Pit
Inspection and Compaction test for backfilling Sub-grade 2nd Layer (2 of 3) around Potable Water Line
Inspection for Installation of Potable Water Line Isolation Pit H/PW/03, L/PW/01, L/PW/02, L/PW/04 at Z
Installation of straight UPVC Conduit (Dia.25mm) and Box for Fire Alarm (Speaker & Flashing Beacon
Installation of straight UPVC Conduit (Dia.75mm) Fire and Security Ductbank connected to Fire and
Weld Visual & NDT Inspection for the Butterfly Garden from Axis 1 to 21
Inspection of Installation and Preliminary Alignment for the Aviary Garden from Grid Line 01 to 23
Steel Reinforcements for BUTTRESS BOI BOV 42, 43, 44 Zone 1K 1L
Inspection of Steel Reinforcement (Horizontal) for the Walls of SBC-08 - Wing Wall (Right Side) - As High
"Inspection and Compaction Test for backfilling sub-grade 3rd Layer (3 of 8) around SBC-05 as highlig
Inspection of Concrete Pouring for the Footing of SBC-08 - Wing Wall (Right Side) - As Highlighted
Inspection of Formwork for the Footing of SBC-08 - Wing Wall (Right Side) - As Highlighted
Concrete Pouring & Shuttering for lintel and Stiffener of Block work & Doors for walls of 350mmt
Inspection & Compaction Tests of 2nd Layer Backfilling (Sub Grade) (Out of 4 layers) for wet well ( F
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 5 layers), along the Plant
Inspection & Compaction Tests for 1st Layer (Sub Grade) Backfilling (Out of 5 layers) Surround (30 n
Inspection & Compaction Tests for 1st Layer (Sub Grade) Backfilling (Out of 5 layers) Surround (25 n
Surface Preparation prior to Backfilling along External Grade Beam & Foundations, from outer side,
Solvent Base Primer Coating Prior to Membrane Water proofing on Foundations and Walls (inner sides)
Primer Coating Prior to Damp proofing for Foundations and Walls (All sides) of Circular Walls (Remain
Protection Layer 4mm thk Bituminous Protection Board on Water Proofing on Columns & Walls Sides (F
Single layer 4mm thk Modified Bituminous Water Proofing Membrane on Columns & Walls Sides (From T.
Solvent Base Primer Coating prior to Membrane Water proofing on Columns & Walls Sides (From T.O.F U
Surface Preparation Prior to Water proofing on Columns & Walls Sides (From T.O.F Upto T.O.C) at Grid
Protection Layer 4mm thk Bituminous Protection Board on Water Proofing on Footing Sides (Upto T.O.F
Inspection Of Pipe Installation For Irrigation Sub-Mainline; (110&63&50mmØ- UPVC-Claas-5 ); As pe
Installation of Main Fire Water Pipes (250mmØ-UPVC-Class-5) From Valve Pit( C/F/11 ) to Vlve Pit (L/
Pipe Installation of Sub-Surface Drainage Perforated Pipes ; (110mmØ, UPVC-CLASS-4) ; As per High
"Inspection and Compaction Test for backfilling sub-grade 4th Layer (4 of 8) around SBC-05 as highlig
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 3) around Fire Water Line Pit
Inspection and Compaction test for backfilling Sub-grade 1st Layer ( 1 of 3) around Potable Water Line
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 8) around SBC-09 - Wing Wall (Le
Inspection of NGL for Corner Connection between SBC-01 & SBC-02 - as highlighted in the attached dra
Inspection of NGL for SBC-05 - as highlighted in the attached drawing.
Inspection of NGL for SBC-09 - as highlighted in the attached drawing.
Installation of straight UPVC Conduit (Dia.25mm) and Box for Security (CAM) at Buttress Axis (01/1AI
Installation of straight UPVC Conduit (Dia.25mm) and Box for Voice and Data (CAM) at Buttress Axis
Level and Location for Buttress with Beam BIV 41, 44 Zone 1K 1L (as highlighted)
Level and Location for Infill wall between BII 7-8 Gridline 01-1/F- 01-1/G (as highlighted) Zone 1B
Level and Location for RETAINING WALL (WALL) 1st stage, Axis 01M to 01K (as highlighted) Zone 1D
Concreting for Buttress with Beam BIV 44 Zone 1L (as highlighted)
Shuttering for Infill wall between BII 7-8 Gridline 01-1/F- 01-1/G (as highlighted) Zone 1B
Shuttering for RETAINING WALL (WALL) Axis 01M to 01K (as highlighted) Zone 1D
Concreting for RETAINING WALL (WALL) 1st stage, Axis 01M to 01K (as highlighted) Zone 1D
Inspection and compaction test 2nd layer for MCPE 1 external area at Zone 2N 2M (as highlighted) axis
Inspection and compaction test 12th layer for backfilling of MCPE 4 Zone 1N (as highlighted) (12th of 1
Installation of straight UPVC conduit (5x160mm) for Medium Voltage Ductbank no. HH/D-MV/02
Inspection of Block Work From Lintel upto Final height of 350mmthk(200mm wall,500 insulation &
Single Layer 4mm thk. Modified Bitumenous Water proofing Membrane for wet area Inside Toilets (
Water Test after Bitumenous Water proofing Membrane for wet area Inside Shower Area (GF-5087) an
Coordinates & Levels for Footing of plant room at Maze Garden, at highlighted area in attached drawi
Sand cover and pipes protection for water feature lines (HDPE 110,63 and 50 mm )inside Mist Garde
Sand bedding for water feature lines (HDPE 110-63 and 50mm) inside Mist Garden, at Water Garden a
Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Grade) (Out of 5 layers), along the Boun
Excavation and Soil preparation for Boat Garden Lake, inside Water Garden, as highlighted area in at
Concrete Pouring & Shuttering for Footing of Plant Room (Remaining part) at Physic Garden, at high
Concrete Pouring & Shuttering for Footing of plant room at Maze Garden, at highlighted area in atta
Solvent Base Primer Coating prior to Membrane Waterproofing for Foundation & wall of Seat walls A &
Inspection of Stone Coping on Boundary wall at "Elevation "D to A" & "B to C (Existing Wall Remaining
Installation of PVC Conduit for Lighting (Linear LED light) at the Large Mosque (between Column Grid
Installation of PVC Conduit for Power (Socket Outlet) at the Large Mosque (Column Grid no. 3/B & 4/
Installation of straight UPVC Conduit sleeve (Dia.110mm - 6pcs.) Low Current Ductbank no. D-LC-PC/4
"Inspection for Installation of Fire & Security Line Pit - F/FS/17, 11, 03, 04,14, G/FS/07, 21, 08, 30, 52,
"Inspection for Installation of Telecommunication Line Pit - F/TL/12, 14, 03,04,16, G/TL/43, 21, 13, 44, 54
Inspection Of Pipe Installation For Non-Potable Water (Irrigation Line ); (110mmØ- UPVC-Claas-5 );
Installation of straight UPVC Conduit (Dia.25mm) and Box for Fire Alarm (Speaker) at Buttress Axis (
HDPE Pipe Installation of Water Features pipes; (250mmØ SDR11-PE100); As per High lighted Attac
Installation of straight UPVC Conduit (Dia.25mm) and Box for Security (CAM) at Buttress Axis (01/1AF
Installation of straight UPVC Conduit (Dia.25mm) and Box for Voice and Data (WIFI &CAM) at Buttress
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 8) around SBC-09 - Wing Wall (R
Inspection of Steel Reinforcement for the Footing and Walls of SBC-08 - Wing Wall (Right Side) - As High
Surface Preparation prior to start backfilling Sub-grade around Fire Water Line Pit K/F/01 at Zone-K - as
Surface Preparation prior to start backfilling Sub-grade around Potable Water Line Pit for K/PW/01 at Zo
Surface Preparation prior to start backfilling Sub-grade around, Corner connection between SBC-1 & SBC
Steel Reinforcements for MCPE 2 Columns (C-49 to C-74) at Ground Floor axis 03J to 03P zone 2G, 2H, 2J
Inspection and compaction test 1st layer for MCPE 1 external area at Zone 2N 2M (as highlighted) axis 0
Inspection and compaction test of 5th (Subgrade) for Beside of Retaining wall Axis 01AJ TO 01AL Zone 1
Level and Location for MCPE 4 Suspended Slab at axis 01AP Zone 1N (as highlighted) (886.515)
Surface preparation & Base primer coating for MCPE 4 undr Foundation at Zone 1N (as Highlighted)
Two layers of 4mm thick modified bituminous waterproofing coating for MCPE 4 undr Foundation at Zo
Inspection of Installation and Alignment for the Crescent 02 Zone 7 - 2B & 2C, From Axis 02D to 02J
Inspection of Alignment for the Installed Baseplates in Crescent 02 Zone 4 – 2J Inner
Inspection of Alignment for the Installed Baseplates in Crescent 02 Zone 4 - 2K Inner
Stack Boulders Installed Layers at levels +877.88, +878.28 & +878.68, along Open Channel (Boat Garde
Solvent Base Primer Coating for Foundations, Columns and Walls (All sides) of Internal Foundations,
Surface Preparation prior to Water Proofing for Footings & Walls of Seat Walls (Left Side) (Outer), In
Concrete Pouring & Shuterring for Footing of Seat Walls (Right Side Remaining part) (Outer), Inside P
Concrete Pouring & Shuttering for Walls of Seat Walls (Right Side) (Outer), Inside Physic garden, as h
Coordinates & Levels for Footing of Seat Walls (Right Side Remaining part) (Outer), Inside Physic gard
Coordinates & Levels for Walls of Seat Walls (Right Side) (Outer), Inside Physic garden, as highlighted
Excavation and Soil preparation for Foundation of Boundary Wall @ Grid (M/22-29) & (29-30/M-R), at
Inspection and Compaction Tests of 3rd Layer (Sub Garde) Backfilling (Out of 7 Layers) along the Boun
Inspection and Compaction Tests of 1st Layer (Sub Garde) Backfilling (Out of 2 Layers) for water fea
Inspection and Compaction Tests of 1st Layer (Sub Garde) Backfilling (Out of 10 Layers) for Sub sur
Surface preparation and Compaction tests for existing fill material prior toBackfilling Inside Outer Ca
Inspection & Compaction Tests of 1st Layer Backfilling (Sub Grade) (Out of 4 layers) for wet well ( F )
Installation of straight UPVC Conduit (Dia.75mm) Low Voltage Ductbank (Power & Emergency) connec
Installation of Straight UPVC Counduit (4x160mm) for Medium Voltage Duct Bank no. BC/D-MV/01 (
Installation of straight UPVC Conduit (Dia.75mm) TELECOM Ductbank connected to TELECOM Handhole
Bolt Tightening Inspection of Crescent 02, Zone 3 - 2M from Axis 02AL to 02AP
Weld Visual & NDT Inspection for the Baseplate Washer Plates in Crescent 02, Zone 3 2M & 2N
Level and Location for MCPE 3 Counter fort and wall (inner) at axis 03-1,02S-03D As highlighted
Level and Location for Buttress with Beam BOI 41 Zone 1K (as highlighted)
Inspection and compaction test 8th (Subgrade) for Beside of Retaining wall Axis 01AK TO 01AO Zone 1 (a
Inspection Of Pipe Installation For Non-Potable Water (Irrigation Line ); (200mmØ- UPVC-Claas-5 );
Inspection of Excavation for Storm Water Line at Zone-4B - As highlighted
Surface Preparation prior to backfilling sub-grade around SBC-09 - Wing Wall - as highlighted
"Inspection and Compaction Test for Backfilling Sub-grade 5th Layer (5 of 5) for excavated trench done
Inspection of Sand bedding under pipe for Non-Potable Water Line at Zone-K including Branch - as highl
"Inspection and Compaction Test for backfilling sub-grade 1st Layer (1 of 1) above Red Tiles for MV Li
Inspection and Compaction Test for backfilling Sub-grade 1st Layer ( 1 of 1) above Green Tiles for Fire
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 1) above Green Tiles for Tele
Inspection for application of 1 Coat Primer, Damp Proof (1st Coat & 2nd Coat) and Protection Board for
Inspection and Compaction Test for backfilling Sub-grade 7th Layer (7 of 7) for cancelled branch line o
Shuttering for MCPE 3 Counter fort and wall (inner) at axis 03-1,02S-03D As highlighted
Inspection of Installation and Alignment for the Butterfly Garden from Axis 01 -21
Concreting for MCPE 3 Counter fort and wall (inner) at axis 03-1,02S-03D As highlighted
Concreting for RING BEAM Zone 2F (INNER) Axis 02-1, 02R to 02V (as highlighted)
Shuttering and Shear Connector for Buttress with Beam BOI 41 Zone 1K (as highlighted)
Concreting for Buttress with Beam BOI 41 Zone 1K (as highlighted)
Steel reinforcement for MCPE 1 Wall at axis 03-1 to 03-2, 02AP As highlighted As per SCR-138-01
Application of Primer Prior to Water proofing for wet area Inside Toilets (GF-5061, 5062 & 5063)
Surface Preparation Prior to Water proofing for Foundations, Columns and Walls (All sides) of Interna
2nd Coat Damp proofing for External Grade Beam & Foundations, from outer side, at Grids (3/A-E & R
1st Coat Damp proofing for External Grade Beam & Foundations, from outer side, at Grids (3/A-E & R
Single layer 4mm thk Modified Bituminous Water Proofing Membrane on Foundations and Walls (inner si
Solvent Base Primer Coating Prior to Membrane Water proofing on Foundations and Walls (inner sides)
Surface Preparation Prior to Water proofing on Foundations and Walls (inner sides) at grid (1-2/A-B)
Inspection & Compaction tests of 5th (Final) Layer Backfilling (Sub-base) (Out of 5 layers) between B
Inspection for Installed Electrical Handholes of Low Voltage (MH/WG/LV/17 to 21, 23-26, 29 & 53) a
Installation of Stone Boulder in Wadi-2, Right Side (RB-140) for Layer's (Different Levels) as per attac
"Inspection and Compaction Test for Backfilling Sub-grade 4th Layer (4 of 5) for excavated trench done
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 1) above GreenTiles for Fire &
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 1) above Green Tiles for Tele
Inspection for Laying of Red Tiles above the pipe for MV Line from G/MV/24 to G/MV/25 at Zone-G - as
Inspection for Laying of GreenTiles above the pipe for Fire & Security Distribution Line from K/FS/13 to
Inspection for Laying of Green Tiles above the pipe for Telecommunication Line from K/TL/21 to K/TL/06
"Inspection and Compaction Test for backfilling sub-grade 2nd Layer (2 of 8) around SBC-05 as highligh
Inspection and Compaction Test for backfilling Sub-grade 6th Layer (6 of 7) for cancelled branch line o
Installation of straight UPVC Conduit (Dia.160mmx5) Medium Voltage Ductbank no. CC/D-MV/11
Installation of straight UPVC Conduit TELECOM (ICT) Ductbank (Dia.110mm) at the Large Mosque Cresc
Installation of straight UPVC Conduit Fire and Security Ductbank (Dia.110mm) at the Large Mosque Cr
Installation of straight UPVC Conduit sleeve (Dia.25mm) for Toilet Fire Alarm and Strobe Cables at In
Inspection and compaction test of 3rd & 4th (Subgrade) for Beside of Retaining wall Axis 01AJ TO 01AL Z
Installation of Main Fire Water Pipes (200&250mmØ-UPVC-Class-5) From Point (647972.602 East
Inspection and compaction test 5th (Subgrade) for Beside of Retaining wall Axis 01AN TO 01AP Zone 1 (a
Surface Preparation Prior to start Backfilling at MCPE 1 external area at Zone 2N 2M (as highlighted) axi
Steel Reinforcements for RING BEAM Zone 2F (OUTER) Axis 02-2, 02T to 02R (as highlighted), KAIG3-
Steel Reinforcements for MCPE 2 Wall between Axis 02AB to 02AA (as highlighted) (871.00)
Anti Termite application under Blinding of SLAB ON GRADE OF LARGE MOSQUE at Zone 1G (as highlighted
Shuttering for Blinding of SOG for Large Mosque ZONE 1G (2nd) (as highlighetd) at grad (C1-E & 2-5 )
Shuttering and Scaffoldings for RING BEAM Zone 2F (OUTER) Axis 02-2, 02T to 02R (as highlighted)
Level & Location for Blinding of SOG for Large Mosque ZONE 1G (2nd) (as highlighetd) at grad (C1-E & 2-
Inspection Of Pipe Installation For Non-Potable Water (Irrigation Line ); (160&200mmØ- UPVC-Claas-
Level and Location for RING BEAM Zone 2F (OUTER) Axis 02-2, 02T to 02R (as highlighted)
Installation and Survey Report for Location and Levels of Anchor Bolts for RING BEAM Zone 2F (OUTER) A
Inspection Of Pipe Installation For Non-Potable Water (Irrigation Line ); (200mmØ- UPVC-Claas-5 );
Preliminary Inspection of Erected Steel in Crescent 01, Zone 4 1C from Axis 01G to 01J
Preliminary Inspection of Erected Steel in the Butterfly Garden from Axis 01 - 21
Preliminary Inspection of Erected Steel in the Butterfly Garden from Axis 01 - 21
Installation of straight UPVC Conduit (Dia.160mmx5) Medium Voltage Ductbank no. HH/D-MV/29 (
Sand cover and pipes protection for water feature line (part 3) (HDPE 250, and 110mm )insidewater
Stack Boulders Installed layer upto Level +877.10, at Bottom Left Side of Geyser Garden, As Highlight
Inspection for 3rd (Final Coat) Cementitious Water proofing for Boundary Wall (Inner & outer faces),
Single Layer 4mm thk. Modified Bitumenous Water proofing Membrane for wet area Inside Shower Are
Concrete Pouring for Blinding under Footings of Pargola (6 no's), at Grid (G & P/3, 4 & 5), at Mana
Steel Reinforcement for Footing and Kicker of plant room at Maze Garden, at highlighted area in atta
Surface Preparation prior to Waterproofing for Foundation & wall of Seat walls A & C (All Sides) and
Surface preparation prior to Waterproofing for Foundations & Walls of Circular Walls (Remaining Part
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 3 layers) Along the walls (
Surface preparation prior to Backfilling Along the walls (Inner Side) of Outer canopy 1, (At Level 874.
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 9 layers) along the Footing
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 5 layers) (After 2 layers
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 5 layers), along the Plant
Geo-textile on Blinding Under the Foundation of plant room (remaining part), at Physic Garden As pe
Protection Layer 4mm thk Bituminous Protection Board for Waterproofing on Blinding Under foundatio
Single layer 4mm thk Modified Bituminous Water Proofing Membrane on Blinding Under foundation of
2nd Coat Cementitiuos Waterproofing for Blinding under foundation of plant room (remaining part),
1st Coat Cementitiuos Waterproofing for Blinding under foundation of plant room (remaining part), a
Installation of Rock and Boulder No. RB-141 - 5th layer (5 of 5)
Installation of Rock and Boulder No. RB-141 - 4th layer (4 of 5)
Inspection for Installation of Potable Water Line Isolation Pit C/PW/01, H/PW/02 at Zone- C & H - as hig
Inspection for Installation of Fire Water Line Isolation Pit L/F/01 at Zone - L - as highlighted
"Inspection for Blinding Concrete under Footing of Storm Box Culvert - SBC-08 - Wing Wall (Right Side)
Inspection for Laying of GreenTiles above the pipe for Fire & Security Distribution Line from G/FS/04 t
Inspection for Laying of Green Tiles above the pipe for Telecommunication Line from G/TL/12 to G/TL/2
"Inspection and Compaction Test for Backfilling Sub-grade 7th & 8th Layer (8 of 8) for Foul Water Li
"Inspection of Excavation for Storm Water Line at Zone-4C including Manhole MH-Y-01, MH-Y-02 - As hi
"Excavation for Non-Potable Water Line at Zone-K including Branch & Pit POC-42, POC-41, NPW-ISC-07
Inspection of Thrust Block for UPVC Pipe (200 & 250 mm Dia) for Fire Water Line at Zone- C,H,L - As H
Inspection and compaction test for sand cover above mecanical pipes inside LARGE MOSQUE (as Highli
Inspection and compaction test 1st, 2nd (Subgrade) for Beside of Retaining wall Axis 01AJ TO 01AL Zone
Inspection and compaction test 7th (Subgrade) for Beside of Retaining wall Axis 01AK TO 01AO Zone 1 (a
Pre-Assembly bolt tightening inspection of Crescent 01 Zone 5 1B Axis 01D to 01G & Zone 4 1C, Axis
Pre-Assembly Bolt tightening inspection of Crescent 02, Zone 6 2D, Axis 02L to 2N as highlighted
Pre-Assembly Bolt Tightening Inspection of Crescent 01, Zone 3 1E, Axis 01M to 01P
Inspection and compaction test 11th layer for backfilling of MCPE 4 Zone 1N (as highlighted) (11th of 1
Installation and Survey Report for Location and Levels of Anchor Bolts for RING BEAM Zone 2H (OUTER)
Installation and Survey Report for Location and Levels of Anchor Bolts for RING BEAM Zone 2F (OUTER) A
Installation and Survey Report for Location and Levels of Anchor Bolts for CANOPY @ BII 38, 39 Zone 1J
Level and Location for MCPE 1 Counter fort and wall (inner) at axis 03-1,03U-03T As highlighted
Level and Location for RING BEAM Zone 2H (OUTER) Axis 02-2, 02Y to 02AB (as highlighted)
Level and Location for RING BEAM Zone 2F (OUTER) Axis 02-2, 02V to 02U (as highlighted)
Surveying for Slab on grade for Large Mosque ZONE 1G (as highlighetd) at grad (2 to 5 & C1 to B )
Notification for Commencing ETFE Sstem Installation Waorks in Priority 1, 2Q2P Sub-Zones.
Level and Location for Buttress BII 38, 39 Zone 1J 1K (as highlighted)
Surveying for Promenade Bridge Abutment wall at Grid 1M (as highlighted)
Level and Location for Buttress BOV 44, 45 Zone 1L (as highlighted)
Shuttering for MCPE 1 Counter fort and wall (inner) at axis 03-1,03U-03T As highlighted
Concreting for MCPE 1 Counter fort and wall (inner) at axis 03-1,03U-03T As highlighted
Steel Reinforcements for MCPE 2 Columns (C-25 to C-40) at Ground Floor axis 03E to 03I zone 2G, 2H, 2J,
Steel Reinforcements for RING BEAM Zone 2H (OUTER) Axis 02-2, 02Y to 02AB (as highlighted), KAIG3
Shuttering for RING BEAM Zone 2H (OUTER) Axis 02-2, 02Y to 02AB (as highlighted)
Shuttering and Scaffolding for RING BEAM Zone 2F (OUTER) Axis 02-2, 02V to 02U (as highlighted)
Steel Reinforcements for RING BEAM Zone 2F (OUTER) Axis 02-2, 02V to 02U (as highlighted), KAIG3-
Steel Reinforcements for Slab on grade for Large Mosque ZONE 1G (as highlighetd) at grad (2 to 5 & C1 t
Shuttering for Slab on grade for Large Mosque ZONE 1G (as highlighetd) at grad (2 to 5 & C1 to B )
Steel Reinforcements and Shear Connector for Infill wall between BII 107-108 Gridline 02AL - 02AM (as
Shuttering and Shear Connector for Buttress BII 38, 39 Zone 1J 1K (as highlighted)
Concreting for Buttress BII 38, 39 Zone 1J 1K (as highlighted)
Concreting for Promenade Bridge Abutment wall at Grid 1M (as highlighted)
Shuttering for Promenade Bridge Abutment wall at Grid 1M (as highlighted)
Shuttering & Shear Connector for Buttress BOV 44, 45 Zone 1L (as highlighted)
Concreting for Buttress BOV 44, 45 Zone 1L (as highlighted)
Steel Reinforcement for Walls of Seat Walls (Right Side) (Outer), Inside Physic garden, as highlighted
Coordinates & Levels for Blinding under Footings of Pargola (6 no's), at Grid (G & P/3, 4 & 5), at
Concrete Pouring for Screed protection on Water proofing for wet area Inside Shower Area's (GF-5
Geo textile Layer after Membrane Water proofing for wet area Inside Shower Area's (GF-5057 & 505
Concrete Pouring for Blinding under Low Current Handhole of Fire Alarm & Security (MH/SG/FA/ 06), a
Inspection and Compaction Tests of 2nd Layer (Sub Garde) Backfilling (Out of 7 Layers) along the Boun
Excavation and Soil preparation for wet well ( F ), at Water Garden as highlighted area in attached dra
Inspection & Compaction Tests after Excavation for Foundations of Pargola (6 no's), at Grid (G & P/
Excavation & Surface Preparation for Foundations of Pargola (6 no's), at Grid (G & P/3, 4 & 5), at
Inspection of 2nd Layer Gravel Backfilling Surround the Manhole (MH-D-01-A3), Inside Maze Garden, a
Inspection & Compaction tests of One Layer (Sub Grade) Backfilling after Sand Cover for water featur
Grouting for Stacked Boulders All Layers at Water Play Garden, (Top Part 1), Inside Water Garden, At
Stone Coping on Boundary wall (after Stone Cladding for walls) @ Span 1 & 2, of Water Garden, at Hi
Stone Coping on Walls of Outer Canopy 1 and Both Sides completed Remaining Stone Coping, at Physic
Stack Boulders Installed Layers at levels +877.08 & +877.48, along Open Channel (Boat Garden Side),
"Inspection and Compaction Test for backfilling sub-grade 1st Layer (1 of 8) around SBC-05 as highligh
Inspection and Compaction Test for backfilling Sub-grade 4th Layer (4 of 4) around Fire Water Line Pit B
"Inspection and Compaction for backfilling Sub-grade 4th Layer (4 of 4) around Potable Water Line Pit
"Inspection and Compaction Test for Backfilling Sub-grade 3rd Layer (3 of 5) for excavated trench done
"Inspection and Compaction Test for Backfilling Sub-grade 5th & 6th Layer (of 8) for Foul Water Line
Inspection of Sand bedding under pipe for MV Line Between H/MV/28 TO L/MV/14 at Zone-H&L - as high
Installation of UPVC Conduit Sleevs (Dia. 32mm) for Low Voltage Duct Bank (Power & Lighting) at the
Installation of UPVC Conduit Sleevs (Dia. 160mm) for Low Voltage Duct Bank (Submain Cables) at the
Installation of straight UPVC Conduit (Dia. 32mm) for Power (Socket Outlet) at the Crescent-02 Infil
Water Test after Membrane Water proofing for wet area Inside Shower Area (GF-5058), Inside Mana
Steel Reinfotcmenet for Slab of New Ticketing Booth # 7A As per Attached Highlighted Drawing's.
Concrete Pouring & Shuttering for Wall of New Ticketing Booth # 1A, As per Attached Highlighted Dra
Coordinates and Levels for Wall of New Ticketing Booth # 1A, As per Attached Highlighted Drawing's.
Sand Bedding for water feature lines (part 6) (HDPE 250 mm) from Water play Garden to entrance of
Surface preparation prior to Waterproofing and Application of Primer coating, 1st & 2nd Coats of D
Excavation & Bed Preparation for Sub surface Drainage Branch pipes (PP 110mm dia) along the Walk wa
Excavation and Bed preparation for water feature lines (part 6) (HDPE 250 mm) from Water play Gard
Excavation & Blinding Levels for Low Current Handholes of Telecom (MH/SG/TC/02 to 05) and Fire Ala
Installation of straight UPVC Conduit (Dia.32mm) for Power(Socket Outlet) at Crescent-02 Infill Wall
Installation of straight UPVC Conduit (Dia.25mm) and Box for Voice and Data (WIFI) at Infill Wall Ax
Installation of straight UPVC Conduit (Dia.25mm) and Box for Fire Alarm (Speaker) at Infill Wall Axi
Installation of straight UPVC Conduit (Dia.25mm) and Box for Fire Alarm (Speaker) at Infill Wall Axis
Installation of straight UPVC Conduit sleeve (Dia.110mm - 6pcs.) Low Current Ductbank no. D-LC-PC/4
Inspection of Concrete (Plain) Pouring for the Duct Bank of MV Line from F/MV/06 to F/MV/11 at Zone-F
Level and Location for Retaining wall (wall kicker) at Zone 1D Axis 01G-01J (as highlighted)
Cementitious waterproofing under Retaining Wall foundation (as Highlighted) ZONE 1D Axis 01G to 01I
Protection layer of 4mm tick bituminous protection board under Retaining Wall (as Highlighted) ZONE
Surface Preparation and Solvent Base Primer under Retaining Wall foundation (as Highlighted) ZONE 1D
Protection layer of 4mm thick bituminous protection board under Retaining Wall foundation (as Highli
Inspection of Alignment for the Installed Baseplates in Crescent 01 Zone 3 - 1F
Level and Location for excavation & Blinding of Diaphragm wall strip footing at Zone 2N Axis 02Q (as hi
Shuttering for Blinding of Diaphragm wall strip footing at Zone 2N Axis 02Q (as highlighted)
Inspection and compaction test 9th & 10th layer for backfilling of MCPE 4 Zone 1N (as highlighted) (9th
Installation of straight UPVC Conduit (Dia. 25mm) and Box for Security (CAM) at the Buttress Axis (01
Installation of straight UPVC Conduit (Dia. 25mm) and Box for Voice and Data (CAM) at the Buttress A
Installation of straight UPVC Conduit (Dia. 25mm) and Box for Fire Alarm (Speaker) at the Buttress A
Installation of Rock and Boulder No. RB-141 - 3rd layer (3 of 5)
Inspection of Concrete Pouring for the Wing Walls of SBC-06 - (As Highlighted)
Inspection of Formwork for the Wing Walls of SBC-06 - (As Highlighted)
"Inspection for the Excavation and Soil Preparation of Storm Box Culvert - SBC-08 - Wing Wall (Right Sid
Surface Preparation prior to start Waterproofing for SBC-09 Upstand, Footing and wall of Wing Wall - as
"Inspection and Compaction Test for Backfilling Sub-grade 3rd & 4th Layer (4 of 8) for Foul Water Li
Inspection and Compaction Test for backfilling Sub-grade 5th Layer (5 of 7) for cancelled branch line o
"Inspection and Compaction Test for Backfilling Sub-grade 2nd Layer (2 of 5) for excavated trench done
"Inspection and Compaction Test for Backfilling Sub-grade 1st Layer (1 of 5) for excavated trench done
Inspection for Installation of Potable Water Line Isolation Pit C/PW/05, C/PW/06, C/PW/08 - as highlight
Pipe Installation of Sub-Surface Drainage (Main Line & Branches) Pipes; (110mmØ, UPVC-CLASS-4)
"Inspection for Installation of Fire Water Line Isolation Pit B/F/10, C/F/04 as highlighted "
Inspection and Compaction Test for backfilling Sub-grade 4th Layer (4 of 4) around Fire Water Line Pit
"Inspection and Compaction for backfilling Sub-grade 4th Layer (4 of 4) around Potable Water Line Pit
Inspection and Compaction Test for backfilling Sub-grade 1st & 2nd Layer (2 of 2) above gravel for th
Inspection of 1st Layer Gravel Backfilling Surround the Manhole (MH-D-01-A3), Inside Maze Garden, a
Soil preparation prior to Backfilling Surround the Manhole (MH-D-01-A3), Inside Maze Garden, at high
Inspection and Compaction Tests of 1st Layer (Sub Garde) Backfilling (Out of 7 Layers) along the Boun
Gravel 3/8 Bedding & Geotextile Surround for Sub surface Pipes Main & Sub line (110mm) along Avia
Water Test after Membrane Water proofing for Wet area Inside Shower Area (GF-5057), Inside Mana
Single Layer 4mm thk. Modified Bitumenous Water proofing Membrane for wet area Inside Shower A
Inspection of First Layer Block Layout at Grid (9/B-E, F), Inside Management Building, As per Highligh
Application of Primer Prior to Damp proofing for External Grade Beam & Foundations, from outer side
Concrete Pouring for Blinding under foundation of plant room at Maze Garden, at highlighted area in
Mock up for Aviary - PTFE1150 as per hilighted one the attached DWG.
"Inspection of Excavation for Storm Water Line at Zone-4B including Manhole MH-O-01 and Gully G-O-47
Excavation for MV Line from H/MV/28 TO L/MV/14 at Zone-H&L including Pit H/MV/28, H/MV/24, H/M
Inspection of backfilling gravel for the Duct Bank of MV Line from K/MV04 to L/MV/08 at Zone-K & L - As
Inspection for application of 1 Coat Primer, Damp Proof (1st Coat & 2nd Coat) and Protection Board f
Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 4) around Fire Water Line Pit
"Inspection and Compaction for backfilling Sub-grade 3rd Layer (3 of 4) around Potable Water Line Pit
Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 4) around Fire Water Line Pit
Inspection and Compaction for backfilling Sub-grade 3rd Layer (3 of 4) around Potable Water Line Pit
Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 4) around Fire Water Line Pit B
"Inspection and Compaction for backfilling Sub-grade 3rd Layer (3 of 4) around Potable Water Line Pit
Inspection and Compaction Test for backfilling Sub-grade 4th Layer (4 of 7) for cancelled branch line o
Surface Preparation prior to start backfill around SBC-05 (Wing Wall) at Zone - 2B - as highlighted
Inspection of Steel Reinforcement (Horizontal) for the Wing Walls of SBC-06 - (As Highlighted)
"Inspection and Compaction Test for Backfilling Sub-grade 1st & 2nd Layer (2 of 8) for Foul Water Li
Shuttering & Shear Connector for Buttress BOI 38, 39, 40 Zone 1J 1K (as highlighted)
Concreting for Buttress BOI 38, 39, 40 Zone 1J 1K (as highlighted)
Steel Reinforcements and Shear Connector for Infill wall between BII 7-8 Gridline 01-1/F- 01-1/G (as hi
Shuttering and Shear Connector for Buttress BOV, BIV 46, 47 Zone 1L 1M (as highlighted)
Preliminary Inspection of Erected Steel in Crescent 01, Zone 5 1B from Axis 01D to 01G
Inspection and compaction test 3rd, 4th (Subgrade) for Beside of Retaining wall Axis 01AN TO 01AP Zone
Inspection and compaction test 5th, 6th (Subgrade) for Beside of Retaining wall Axis 01AK TO 01AO Zone
Inspection and compaction test 1st, 2nd & 3rd (Red sand) for Beside of Retaining wall Axis 01AJ TO 01AL
Inspection and compaction test 1st, 2nd (Subgrade) for Beside of Retaining wall Axis 01AN TO 01AP Zone
Level and Location for Buttress BOI 38, 39, 40 Zone 1J 1K (as highlighted)
Level and Location for BOV, BIV 46, 47 Zone 1L 1M (as highlighted)
Level and Location for RING BEAM Zone 2G (OUTER) Axis 02-2, 02V to 02Y (as highlighted)
Weld Visual & NDT Inspection for Crescent 01, Zone 4 - 1C, Axis 01H to 01J
Preliminary Inspection of Erected Steel in Aviary Garden from Grid Line 01 to 08.
Installation of straight UPVC Conduit (Dia.75mm) sleeve for Power (Normal Lighting Ckt.,Small PowerC
Installation of straight UPVC Conduit (Dia.75mm) sleeve for TELECOM (SM Fiber Optic Cables, CAT6A Ca
Installation of UPVC Conduit Sleevs (Dia. 160mm) for Low Voltage Duct Bank (Submain Cables) at the
Installation of UPVC Conduit Sleevs (Dia. 32mm) for Low Voltage Duct Bank (Power & Lighting) at the
Installation of soil, waste & vent and rain water pipes; CI pipes (50, 75, & 100mmØ) as per high lighte
Inspection Of Pipe Installation For Non-Potable Water (Irrigation Line ); (200&250mmØ- UPVC-Claas-
Application of Primer Prior to Water proofing of wet area Inside Shower Area (GF-5058 and GF-5087)
Single Layer 4mm thk. Modified Bitumenous Water proofing Membrane for Wet area Inside Shower A
Steel Reinforcement for walls of Plant Room at Physic Garden, at highlighted area in attached draw
Inspection Compaction tests of 3rd Layer (Sub Grade) Backfilling (Out of 6 layers) Surround conopy foo
Concrete Pouring & Shuttering for Slab and Parapet of Stair Core Room, at Grid (G-F/8), on Manageme
Inspection of Levels for Slab and Parapet (+7.10 & +7.70) of Stair Core Room, at Grid (G-F/8), on Man
Concrete Pouring for Grade Beam at grid between (9/B-E), at Management Building as highlighted ar
Surface Preparation and Chipping Prior to Plastering at External Elevations at Site Tower 2, as per th
"Inspection for the Excavation and Soil Preparation for Foul Water Line prior to start backfilling at
Inspection of Sand bedding under pipe for Potable Water Line at Zone-L - as highlighted (Stock Pile # 13
Inspection of Sand bedding under pipe for Fire Water Line at Zone-L - as highlighted (Stock Pile # 132)
Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 7) for cancelled branch line o
Inspection and compaction test 3rd, 4th (Subgrade) for Beside of Retaining wall Axis 01AL TO 01AO Zone
Excavation for Potable Water Line at Zone-L - as highlighted
Excavation for Fire Water Line at Zone-L - as highlighted
Surface Preparation prior to start backfilling gravel for the Duct Bank of MV Line from K/MV04 to L/MV
Inspection of Waterproofing for the Duct Bank of MV Line from K/MV04 to L/MV/08 at Zone-K & L (As H
Surface Preparation prior to start Waterproofing for the Duct Bank of MV Line from K/MV04 to L/MV/08
Installation and Survey Report for Location and Levels of Anchor Bolts for RING BEAM Zone 2G (OUTER) A
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 7) for cancelled branch line
Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 4) around Fire Water Line Pit
Surveying for Diaphragm Wall FOUNDATION for Zone 2N axis 02R (as highlighted)
"Inspection and Compaction for backfilling Sub-grade 3rd Layer (3 of 4) around Potable Water Line Pit
Level and Location for INFILL WALL between BII 108-109 Gridline 02-1AM- 02-1AN (as highlighted) Zon
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 4) around Fire Water Line Pit
Inspection and Compaction for backfilling Sub-grade 2nd Layer (2 of 4) around Potable Water Line Pit
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 4) around Fire Water Line Pit F
Level and Location for RING BEAM Zone 2G (OUTER) Axis 02-2, 02V to 02Y (as highlighted)
"Inspection and Compaction for backfilling Sub-grade 2nd Layer (2 of 4) around Potable Water Line Pit
Concreting for RING BEAM Zone 2J (INNER) Axis 02-1, 02AB to 02AE (as highlighted)
Concreting for RING BEAM Zone 2K (INNER) Axis 02-1E, 02AH to 02AE (as highlighted)
Concreting for Diaphragm Wall FOUNDATION for Zone 2N axis 02R (as highlighted)
Shuttering and Shear connector for INFILL WALL between BII 108-109 Gridline 02-1AM- 02-1AN (as hig
Concreting for BUTTRESS BIV 42, 43, BOV 41 Zone 1L 1K (as highlighted)
Shuttering for Diaphragm Wall FOUNDATION for Zone 2N axis 02R (as highlighted)
Steel Reinforcements for RING BEAM Zone 2G (OUTER) Axis 02-2, 02V to 02Y (as highlighted), KAIG3-
Shuttering and Scaffolding for RING BEAM Zone 2G (OUTER) Axis 02-2, 02V to 02Y (as highlighted)
Concreting for RING BEAM Zone 2G (OUTER) Axis 02-2, 02V to 02Y (as highlighted)
Concreting for MCPE 4 Suspended Slab at axis 01AP Zone 1N (as highlighted) (886.515)
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 7) for cancelled branch line o
Inspection of Formwork for the Footing of SBC-06 - Wing Wall - (As Highlighted)
Inspection of Steel Reinforcement for the Footing and Walls of SBC-06 - Wing Wall - (As Highlighted)
Inspection for Blinding Concrete under Fire & Security Line Pit B/FS/06, B/FS/15, B/FS/14, B/FS/31, G/
Inspection for Blinding Concrete under Telecommunication Line Pit B/TL/13, B/TL/12, B/TL/10, B/TL/32
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 4) around Fire Water Line Pi
"Inspection and Compaction for backfilling Sub-grade 2nd Layer (2 of 4) around Potable Water Line Pit
"Inspection for Blinding Concrete under Potable Water Line Pit for C/PW/01 at Zone-C - as highlighted "
Inspection of Reinforced Concrete Pouring for the Duct Bank of MV Line from B/MV/08 to B/MV/21 at
Inspection of Formwork for the Duct Bank of MV Line from B/MV/08 to B/MV/21 at Zone-B&C (As High
Inspection of Steel Reinforcement for the Duct Bank of MV Line from B/MV/08 to B/MV/21 at Zone-B&
Inspection of Concrete Pouring for the Upstand of SBC-03 (As Highlighted)
Inspection of Formwork for the Upstand of SBC-03 (As Highlighted)
Inspection of Concrete Pouring for the Upstand of SBC-09 (As Highlighted)
Inspection of Formwork for the Upstand of SBC-09 (As Highlighted)
Inspection of Concrete Pouring for the Upstand of SBC-02 (As Highlighted)
Inspection of Formwork for the Upstand of SBC-02 (As Highlighted)
Inspection of Sand bedding under pipe for Potable Water Line at Zone-L&M - as highlighted (Stock Pile
Inspection of Sand bedding under pipe for Fire Water Line at Zone-L & M - as highlighted (Stock Pile # 1
' Pipe Installation of Foul Water Line for (315mmØ - UPVC- Class 4) from (FW-A-13 to FW-A-12). At
'Bedding of Gravel 3/8" and Geotextile Surrounding Foul Water Line for (315mmØ - UPVC- Class 4) f
Installation of straight UPVC Conduit (Dia.32mm) for Power(Socket Outlet) at Crescent-02 Infill Wall
Installation of straight UPVC Conduit (Dia.25mm) and Box for Security (CAM) at Crescent-02 Infill Wa
Installation of straight UPVC Conduit (Dia.25mm) and Box for Voice and Data (CAM) at Crescent-02 In
Coordinates & Levels for Roof Slabs at Grid (A/8) & (A/14-15), Inside Butterfly Garden, at highlighted
Installation of straight UPVC Conduit (Dia.25mm) and Box for Fire Alarm (Speaker) at Crescent-02 Inf
Mockup for Hardscape Finishes (Interlock-Classico Light or Yellowish beige (250x130x60cm, 1
Installation of straight UPVC Conduit (Dia.25mm) and Box for Fire Alarm (Smoke Dectector) at the M
Installation of straight UPVC conduit (4x160mm) for Medium Voltage Ductbank no. HH/D-MV/02
Protection layer 4mm thk Bituminous Protection Board for Water Proofing Membrane on boundary wall
Excavation and Bed preparation for Sub surface Pipes Main & Sub line (110mm) along Aviary Garden
Soil Preparation Prior to Backfilling along the Footing (Outer Side), (at B.O.B level +874.895, 875.18,
Steel Reinforcement & Shuttering for lintel and Stiffener of Block work & Doors for walls of 350
Inspection of Block Work Upto Lintel height of 350mmthk(200mm wall,500 insulation & 100mm wall
Concrete Pouring and Shuttering for Walls of Seat Walls (Left Side) (Outer), Inside Physic garden, as
Coordinates and levels for Walls of Seat Walls (Left Side) (Outer), Inside Physic garden, as highlighte
Concrete Pouring & Shuttering for Foundation of wet well (E), Inside Water Garden as highlighted are
Coordinates & Levels for Foundation of wet well (E), Inside Water Garden as highlighted area in attac
Steel Reinforcement for Foundation of wet well (E), Inside Water Garden as highlighted area in attac
Inspection & Compaction tests of 4th Layer Backfilling (Sub-base) (Out of 5 layers) between Boat Gar
Coordinates & Levels for Footing of Seat Walls (Remaining part) (Outer), Inside Physic garden, as high
Steel Reinforcement for Footing of Seat Walls (Remaining part) (Outer), Inside Physic garden, as high
Steel Reinforcement for Roof Slabs at Grid (A/8) & (A/14-15), Inside Butterfly Garden, at highlighted
Inspection of Installation and Alignment for the Butterfly Garden from Axis 01 - 21
Bolt Tightening inspection of Crescent 2 2Q- 2P, from axis 02AZ to 02AT & Zone 3 2N, from Axis 02AT
Inspection and Installation and Alignment for the Crescent 2 Zone 2M axis 02AP tp 02AL
Level and Location for RING BEAM Zone 1G (INNER) Axis 01-1E, 01S to 01W (as highlighted)
Level and Location for BUTTRESS BOV 42 & 43 Zone 1K 1L (as highlighted)
Steel Reinforcements for Diaphragm Wall FOUNDATION for Zone 2N axis 02R (as highlighted)
Shuttering and Shear Connector for BUTTRESS BOV 42 & 43 Zone 1K 1L (as highlighted)
Concreting for BUTTRESS BOV 42 & 43 Zone 1K 1L (as highlighted)
Installation and Survey Report for Location and Levels of Anchor Bolts for RING BEAM Zone 1G (INNER)
Steel Reinforcements & Shear Connector for RING BEAM Zone 1G (INNER) Axis 01-1E, 01S to 01W (as hig
Shuttering & Scaffolding for RING BEAM Zone 1G (INNER) Axis 01-1E, 01S to 01W (as highlighted)
Inspection and compaction test 8th layer MCPE 3 Zone 2E 2F axis 02S (as highlighted) (1st of 1st layer
Inspection and compaction test 1st, 2nd (Subgrade) for Beside of Retaining wall Axis 01AL TO 01AO Zone
Installation of Main Fire Water Pipes (250mmØ-UPVC-Class-5) From Valve Pit( C/F/11 ) to Vlve Pit (L
Installation of straight UPVC conduit (4x160mm) for Medium Voltage Ductbank no. BC/D-MV/01 (Ma
Excavation and Bed preparation for wet well( E ) ,at Water Garden as highlighted area in attached dra
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 4) around Fire Water Line Pit
"Inspection and Compaction for backfilling Sub-grade 2nd Layer (2 of 4) around Potable Water Line Pit
"Inspection for Installation Of Isolation Fire Water Line Pit C/F/13, C/F/16, C/F/17, as highlighted "
INSPECTION OF INSTALLATION OF ALL RINGS (RAISER) AND SLAB FOR FW-A-09 (AS ATTACHED)
Inspection and Compaction Test for Backfilling Sub-Base 1st Layer (1 of 1) under Boulder No. RB-322 (Sto
Inspection and Compaction Test for Backfilling Sub-Base 1st Layer (1 of 1) under Boulder No. RB-321 (Sto
Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 3) under Fire & Security Distr
Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 3) under Fire & Security Distr
Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 3) under Telecommunication Li
Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 3) under Telecommunication L
Inspection and Compaction Test for Backfilling Sub-grade 4th Layer (4 of 4) under Boulder No. RB-322 (St
Inspection and Compaction Test for Backfilling Sub-grade 4th Layer (4 of 4) under Boulder No. RB-321 (St
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 2) under Potable Water Line P
Level and Location for Blinding of SLAB ON GRADE OF LARGE MOSQUE at Zone 1G (as highlighted) (1ST)
Level and Location for MCPE 3 Wall at Axis 02R to 02Q (as highlighted) (871.00)
Level and Location for BUTTRESS BIV 42, 43, BOV 41 Zone 1L 1K (as highlighted)
1st and 2nd layer of 4mm thick modified bituminous water proofing membrane for Retaining wall (inner)
Protection layer of 4mm thick bituminous protection board for Retaining wall (inner) wall at axis 01AP t
Shuttering for MCPE 3 Wall at Axis 02R to 02Q (as highlighted) (871.00)
Concreting for MCPE 3 Wall at Axis 02R to 02Q (as highlighted) (871.00)
Anti Termite application under Blinding of SLAB ON GRADE OF LARGE MOSQUE at Zone 1G (as highlighte
Shuttering for Blinding of SLAB ON GRADE OF LARGE MOSQUE at Zone 1G (as highlighted) (1ST)
1st and 2nd Layer of modified bituminous water proofing membrane for Retaining wall (inner) foundatio
Protection layer of 4mm thick bituminous protection board for Retaining wall (inner) foundation at axis
Surface Preparation and Solvent Base Primer Coating for Retaining wall (inner) wall at axis 01AP to 01AJ
Shuttering and Shear Connector for BUTTRESS BIV 42, 43, BOV 41 Zone 1L 1K (as highlighted)
Pre-assembly bolt tightening inspection of crescent 02, zone 6 2d axis 02L to 02N & Crescent 01, Zon
Inspection for Blinding Concrete under Fire Water Line Pit for C/F/04, B/F/17, B/F/10 at Zone-B&C - as h
"Inspection of Thrust Block for Non-Potable Water Line ( Dia 250mm & 200mm) at Zone-G&K - As Hig
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 4) around Fire Water Line Pit
Inspection and Compaction for backfilling Sub-grade 1st Layer (1 of 4) around Potable Water Line Pit
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 4) around Fire Water Line Pit F/
"Inspection and Compaction for backfilling Sub-grade 1st Layer (1 of 4) around Potable Water Line Pit
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 4) around Fire Water Line Pit B
"Inspection and Compaction for backfilling Sub-grade 1st Layer (1 of 4) around Potable Water Line Pit
Surface Preparation prior to start Waterproofing for Corner connection between SBC-1 & SBC-2 - as hig
Excavation for Potable Water Line at Zone-L&M including branch & Pit - PW-13, L/PW/07, L/PW/10, PW-1
Excavation for Fire Water Line at Zone-L & M including Pit - FF-08, M/F/02, M/F/01, FF-10 - as highlighte
Inspection and compaction test 8th & 9th layer for backfilling of MCPE 4 Zone 1N (as highlighted) (8 & 9
Inspection for application of 1 Coat Primer, Damp Proof (1st Coat & 2nd Coat) and Protection Board fo
Inspection and compaction test 7th layer MCPE 3 Zone 2E 2F axis 02S (as highlighted) (1st of 1st layer f
Inspection and compaction test 1st, 2nd & 3rd layer (Rredsand) for Beside of Retaining wall Axis 1AP to
Installation and Survey Report for Location and Levels of Anchor Bolts for CANOPY @ BII 50, 51 Zone 1N
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 3) under Fire & Security Distr
Installation and Survey Report for Location and Levels of Anchor Bolts for RING BEAM Zone 2F (INNER) A
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 3) under Fire & Security Distr
Level and Location for BUTTRESS BII 50 51 Zone 1N 1M (as highlighted)
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 3) under Telecommunication L
Level and Location for BUTTRESS BIV 46 47 Zone 1L 1M (as highlighted)
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 2) under Telecommunication Li
Level and Location for RING BEAM Zone 2F (INNER) Axis 02-1, 02R to 02V (as highlighted)
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 3) under Telecommunication L
Level and Location for Promenage Bridge Abutment Wall (2nd) at Grid P Zone 4 (as highlighted)
"Inspection for Blinding Concrete under Footing of Storm Box Culvert - SBC-06 - Wing Wall (As Highligh
Level and Location for excavation & Blinding of Diaphragm wall at Zone 2N Axis 02Q (as highlighted)
Inspection and Compaction Test for Backfilling Sub-grade 3rd Layer (3 of 4) under Boulder No. RB-322 (St
Level and Location for RING BEAM Zone 2K (INNER) Axis 02-1, 02AE to 02AH (as highlighted)
Level and Location for Tunnel 1 (1 outer RIGHT) wall part-C (as Highlighted) Zone 2H
Inspection and Compaction Test for Backfilling Sub-grade 3rd Layer (3 of 4) under Boulder No. RB-321 (St
Inspection and Compaction Test for Backfilling Sub-grade 9th Layer (9 of 10) for Storm Water Line F
Level and Location for Infill Wall at Zone 2H between BI 90-91 between Gridline 02-1Y- 02-1Z (as highli
Inspection And Compaction Test of backfilling Sub-grade 8th Layer (8 of 8) around Manhol MH-M-07,
"Inspection And Compaction Test of Backfilling Sub-grade 17th Layer (17 of 17) For Foul Water Line
Inspection And Compaction Test of Backfilling Sub-grade 16th Layer (16 of 17) For Foul Water Line Fr
Inspection And Compaction Test of Backfilling Sub-grade 14th Layer (14 of 14) For Foul Water Line Fr
Inspection and Compaction for backfilling Sub-grade 4th Layer (4 of 4) around Fire Water Line Pit F/F/
Inspection and Compaction Test for backfilling Sub-grade 4th Layer (4 of 4) around Potable Water Li
Level and Location for Infill wall between Gridline 02-2AX - 02-2AW, BO 121-122 (as highlighted) Zone 2
Level and Location for RING BEAM Zone 2J (INNER) Axis 02-1, 02AB to 02AE (as highlighted)
Level and Location for Promenage Bridge Abutment Wall at Grid P Zone 4
Level and Location for RETAINING WALL (WALL) Axis 01G to 01I (as highlighted) Zone 1D
Shuttering and Shear Connector for BUTTRESS BII 50 51 Zone 1N 1M (as highlighted)
Concreting for BUTTRESS BII 50 51 Zone 1N 1M (as highlighted)
Concreting for MCPE 4 Ground wall and roof Slab at axis 01AP Zone 1N (as highlighted)
Concreting for Blinding of Bridge to south tower abutments wall at grid 02C Zone 7 (as highlighted)
Concreting for RING BEAM Zone 1G (OUTER) Axis 01-2, 01W to 01S (as highlighted)
Steel Reinforcements for INFILL WALL between BII 108-109 Gridline 02-1AM- 02-1AN (as highlighted)
Shuttering and Shear Connector for BUTTRESS BIV 46 47 Zone 1L 1M (as highlighted)
Grouting of Installed Anchor bolt and under Baseplate at Zone 2L INNER & OUTER ring beam (as highl
Steel Reinforcements for RING BEAM Zone 2F (INNER) Axis 02-1, 02R to 02V (as highlighted)
Shuttering, Shear Connector and Scaffoldings for RING BEAM Zone 2F (INNER) Axis 02-1, 02R to 02V (as
Shuttering for Promenage Bridge Abutment Wall (2nd) at Grid P Zone 4
Concreting for Promenage Bridge Abutment Wall (2nd) at Grid P Zone 4
Steel Reeinforcements for Promenage Bridge Abutment Wall (2nd) at Grid P Zone 4 as highlighted
Steel Reinforcements for Promenade Bridge Abutment wall at Grid 1M (as highlighted)
Shuttering for Blinding of Diaphragm wall at Zone 2N Axis 02Q (as highlighted)
Shuttering for Tunnel 1 (1 outer right) wall part-C (as Highlighted) Zone 2H
Concreting for Tunnel 1 (1 outer right) wall part-C (as Highlighted) Zone 2H
Sand cover and pipes protection for water feature line (part 3) (HDPE 250, and 110mm )insidewater
Sand cover and pipes protection for water feature lines (HDPE 110,63 and 50 mm )inside Mist Garde
Shuttering for Infill Wall at Zone 2H between BI 90-91 between Gridline 02-1Y- 02-1Z (as highlighted)
Inspection & Compaction tests of 3rd Layer Backfilling(Sub-base) (Out of 5 layers) between Boat Ga
Shuttering for Infill wall between Gridline 02-2AX - 02-2AW, BO 121-122 (as highlighted) Zone 2Q
Coordinates and levels for Footing & Kicker of Plant Room at ( Rrmaining )Physic Garden, at highl
Concreting for Infill wall between Gridline 02-2AX - 02-2AW, BO 121-122 (as highlighted) Zone 2Q
Steel Reinforcement for Footing & Kicker of Plant Room at ( Rrmaining )Physic Garden, at highlight
Steel Reinforcement for S.O.G at grid between 8 &9 A-E, E between 8 & 9, at Management Building
Steel Reinforcement for roof slab its parapet, at Management Building as highlighted area in attache
Shuttering for Promenage Bridge Abutment Wall at Grid P Zone 4
Application of 2nd coat of damp proof for kicker of Boundary Wall (Inner & outer face) ,Span 50B, 51
Bolt Tightening Inspection of Aviary Garden from Grid Line 16 to 23 as per the highlighted area in th
Application of 1st coat of damp proof for kicker of Boundary Wall (Inner & outer face) ,Span 50B, 51
Application of Primer prior to damp proof for kicker of Boundary Wall (Inner & outer face) ,Span 50B
Concreting for Promenage Bridge Abutment Wall at Grid P Zone 4
Weld Visual & NDT Inspection for the Crescent 01 at Zone 4 1D Axis 01J to 01L asa per the highlighte
Shuttering for RETAINING WALL (WALL) Axis 01G to 01I (as highlighted) Zone 1D
Inspection for application of Cementitious Water proofing (2nd coat ) for Boundary Wall (Inner & out
Inspection for application of Cementitious Water proofing (1st coat ) for Boundary Wall (Inner & out
Sand Blasting prior to start Stone cladding & Water proofing for Boundary Wall (Inner & outer face) (
Concreting for RETAINING WALL (WALL) Axis 01G to 01I (as highlighted) Zone 1D
Shuttering, Shear Connector & Scaffoldings for RING BEAM Zone 2J (INNER) Axis 02-1, 02AB to 02AE (as
Grouting of Installed Anchor bolt and under Baseplate at Zone 2L INNER & OUTER ring beam (as highl
Installation of UPVC Conduit Sleevs (Dia. 110mm) for Low Current Duct Bank (ICT) at the Crescent-02
Installation of UPVC Conduit Sleevs (Dia. 110mm) for Low Current Duct Bank (FA & Security) at the C
Installation of UPVC Conduit Sleevs (Dia. 110mm) for Low Current Duct Bank (Fiber Optic & Spare) at
Installation of UPVC Conduit Sleevs (Dia. 110mm) for Low Current Duct Bank (Fire & Security) at the
Installation of Rock and Boulder No. RB-141 - 1st layer (1 of 5)
Inspection And Compaction Test of Backfilling Sub-grade 6th Layer (6 of 13) For Foul Water Line Fro
"Inspection of Concrete (Plain) Pouring for Duct Bank of Fire & Security line from K/FS/07 to K/FS/10 at
Inspection of Concrete (Plain) Pouring for Duct Bank of Telecommunications line from K/TL/22 to K/TL/2
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 4) around Fire Water Line Pit B
"Inspection and Compaction for backfilling Sub-grade 1st Layer (1 of 4) around Potable Water Line Pit
Inspection of Sand Bedding under pipe for Non-Potable Water Line Branches at Zone-G&K - as highlight
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 3) under Fire & Security Distri
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 1) under Fire & Security Distri
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 3) under Fire & Security Distri
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 3) under Telecommunication Li
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 1) under Telecommunication Li
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 2) under Telecommunication Li
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 3) under Telecommunication Li
Inspection and Compaction Test for Backfilling Sub-grade 2nd Layer (2 of 4) under Boulder No. RB-322 (St
Inspection Of Pipe Installation For Non-Potable Water (Irrigation Line ); (200mmØ- UPVC-Claas-5 );
Inspection and Compaction Test for Backfilling Sub-grade 2nd Layer (2 of 4) under Boulder No. RB-321 (St
"Inspection and Compaction test for backfilling Sub-grade 2nd & 3rd layer (3 of 3) around SBC at Zone-H
Inspection and Compaction Test for Backfilling Sub-grade 7th Layer (7 of 8) for Storm Water Line Fr
Shuttering, Shear Conncetor and Scaffolding for RING BEAM Zone 2K (INNER) Axis 02-1E, 02AH to 02AE (
Inspection and Compaction Test for Backfilling Sub-grade 8th Layer (8 of 8) for Storm Water Line Fr
Steel Reinforcements for RING BEAM Zone 2J (INNER) Axis 02-1, 02AB to 02AE (as highlighted)
"Inspection And Compaction Test of backfilling Sub-grade 7th Layer (7 of 8) around Manhol MH-M-07
"Inspection And Compaction Test of Backfilling Sub-grade 16th Layer (16 of 17) For Foul Water Line
Steel Reinforcements for RING BEAM Zone 2K (INNER) Axis 02-1E, 02AH to 02AE (as highlighted)
Inspection And Compaction Test of Backfilling Sub-grade 15th Layer (15 of 17) For Foul Water Line Fr
Inspection And Compaction Test of Backfilling Sub-grade 13th Layer (13 of 13) For Foul Water Line Fr
Installation and Survey Report for Location and Levels of Anchor Bolts for RING BEAM Zone 2K (INNER)
Installation and Survey Report for Location and Levels of Anchor Bolts for RING BEAM Zone 2J (INNER) A
Inspection of Installation and Alignment for the Crescent 02 Zone 2 - 2P, Axis 02AW to 02AT
Preliminary Inspection of Erected Steel in Crescent 02, Zone 6 2D from Axis 02J to 02N
Inspection of Installation and Alignment for the Crescent 02 Zone 3 - 2N, Axis 02AT to 02AP
Installation of UPVC Conduit Sleevs (Dia. 160mm) for Low Voltage Duct Bank (Submain Cables) at the
Concrete Pouring for blinding under Fountain of (5 nos) at Physic Garden as highlighted area in atta
Weld Visual & NDT Inspection for the Crescent 01, Zone 4 1D, Axis 01J & Crescent 02, Zone 4 2L Axis
Installation of UPVC Conduit Sleevs (Dia. 110mm) for Low Voltage Duct Bank (Lighting & Power) at th
Coordinates and levels of blinding under Fountain of (5 nos) at Physic Garden as highlighted area in
Weld Visual & NDT Inspection for the Baseplate Washer Plates in Crescent 02, Zone 3 2M & 2N
Inspection & Compaction tests of 2nd Layer Backfilling(Sub-base) (Out of 5 layers) between Boat Gar
Sand bedding for Irrigation Sub-Main line Distribtion network (part 2) ( 50,110 mm line ),(inside wa
Inspection & Compaction tests of 1st Layer Backfilling(Sub-base) (Out of 5 layers) between Boat Ga
Excavation and Soil preparation under Fountain of (5 nos) at Physic Garden as highlighted area in at
Application of Primer for Water proofing of wet area (Shower) , At Management Building as highlig
"Inspection of Concrete Pouring for the Wing Wall ( F3 & F4) of SBC-03 (As Highlighted)"
Inspection of Formwork for the Wing Wall ( F3 & F4) of SBC-03 (As Highlighted)
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 2) around Potable Water Line
"Inspection for the Excavation and Soil Preparation of Storm Box Culvert - SBC-06 - Wing Wall (Right Sid
Inspection of Steel Reinforcement for the Upstand of SBC-09 (As Highlighted)
Inspection and Compaction Test for Backfilling Sub-grade 1st Layer (1 of 4) under Boulder No. RB-322 (St
Inspection and Compaction Test for Backfilling Sub-grade 1st Layer (1 of 4) under Boulder No. RB-321 (St
Inspection and Compaction test for backfilling Sub-grade 1st layer (1 of 3) around SBC at Zone-H - As hig
Inspection of Sand bedding under pipe for MV Line Between B/MV/17 TO C/MV/40 at Zone-C - as highlig
Inspection of Sand bedding under pipe for Non-Potable Water Line Branches at Zone-B - as highlighted
Surface Preparation prior to start backfilling gravel around Fire Water Line Pit B/F/04, B/F/05, B/F/06,
Surface Preparation prior to start backfillingSub-grade around Potable Water Line Pit for B/PW/05, B
Inspection and compaction tests for 8th layer of Backfill (sub grade ) along the Boundary wall (Oute
Coordinates and levels of blinding under foundation of plant room at Mazer Garden as highlighted a
Installation of straight UPVC Conduit (Dia.160mmx4) Medium Voltage Ductbank no. BC/D-MV/04 (M
Installation of PVC Conduit (Dia. 25mm) and Box for Voice and Data System (DATA, CAM & Telephone)
Installation of straight UPVC Conduit (Dia.25mm) and Box for Fire Alarm (Speaker) at Buttress Axis (0
Applying ( LA extra ) for Structural repair at External Elevations at Site Tower 2, as per the attached
Shear Connector for Infill Wall at Zone 2M between Gridline 02-1AP - 02-1AO (as highlighted) (BII 110-1
Inspection and compaction test 5TH & 6TH layer MCPE 3 Zone 2E 2F axis 02S (as highlighted) (1st of 1st
Inspection and compaction test 7th layer for backfilling of MCPE 4 Zone 1N (as highlighted) (7 of 14 lay
Inspection and compaction test 4th layer around Pilecap 151 at Zone 2K (as highlighted) (4th of 4th lay
Stack Boulders Installed layers at Levels +877.05 , along Boundary wall (at span 16-17) from Inside,
Concrete Pouring & Shuttering for lintel and Stiffener of Doors & Block work & Stiffner Column's for all
Steel Reinforcement & Shuttering for lintel and Stiffener of Doors & Block work & Stiffner Column's for
Excavation and Soil preparation under location of foundation of plant room at Mazer Garden as highl
Concrete pouring for Blinding under Storm Water Manholes of 3nos (MH-D-07-01), (MH-D-07-02) and
Excavation & Blinding Levels for Storm Manholes of 3nos (MH-D-07-01), (MH-D-07-02) and (MH-D-07-0
Weld Visual & NDT Inspection for the Baseplate Washer Plates in Crescent 02, Zone 2 2Q & 2P
Installation of UPVC Conduit (Dia. 25mm) & Boxes for Power (Fused Connection, Socket Outlet, Thermo
HDPE Pipe Installation of Water Features pipes; (63&110mmØ SDR11-PE100); As per High lighted At
Installation of PVC Conduit (Dia. 75mm) and Junction Box for Low Current System at the New Ticket B
Surface Preparation prior to start Waterproofing for SBC-05 - as highlighted
Installation of PVC Conduit (Dia. 25mm) and Box for Security System (CAM, Door Controller, Magnetic
Installation of UPVC Conduit (Dia. 25mm) and Box for Fire Alarm System (Break Glass) at the New Tick
Surface Preparation prior to start backfilling gravel around Fire Water Line Pit F/F/05, F/F/06, F/F/07,
Surface Preparation prior to start backfilling gravel around Potable Water Line Pit for F/PW/09, F/P
"Soil Preparation prior to start backfilling around SBC at Zone-H - As highlighted "
Inspection And Compaction Test of Backfilling Sub-grade 5th Layer (5 of 13) For Foul Water Line Fro
Inspection of Installation and Alignment for the Crescent 02 Zone 2 - 2Q axis 02AW to 02AZ
Surface Preparation Prior to continue Backfilling at MCPE 4 Zone 1N (as highlighted)
Surface Preparation Prior to start Backfilling for Childcare (as highlighted) Zone 2N
Inspection and compaction test 4th layer for Strip footing (outer) Zone 1P (as highlighted) axis 01AP -
Inspection and compaction test 5th & 6th layer for backfilling of MCPE 4 Zone 1N (as highlighted) (6 of
Inspection and compaction test 3rd layer around Pilecap 151 at Zone 2K (as highlighted) (3rd of 4th lay
Inspection and compaction test 3rd & 4th layer MCPE 3 Zone 2E 2F axis 02S (as highlighted) (1st of 1st
Inspection And Compaction Test of Backfilling Sub-grade 3rd Layer (3rd of 4) For Foul Water Line From
Level and Location for Infill Wall at Zone 2M between Gridline 02-1AP - 02-1AO (as highlighted) (BII 110
Level and Location for RETAINING WALL (WALL) Axis 01I to 01J (as highlighted) Zone 1D
Inspection And Compaction Test of Backfilling Sub-grade 4th Layer (4 of 6) For Foul Water Line From F
Level and Location for Infill Wall (kicker) at Zone 2N between BI 113-114-115 Between Gridlines 02-1 AQ
Soil Preparation under Boulder No. RB- 321
Soil Preparation under Boulder No. RB- 322
Surface Preparation prior to start backfilling Sub-grade around Potable Water Line Pit for C/PW/01 at Zo
Level and Location for Infill Wall between Gridline 02-1X - 02-1Y Zone 2G (as highlighted)
Inspection of Sand bedding under pipe for Potable Water Line at Zone-C including branch - as highlighte
Level and Location for Cafeteria Foundation RAFT 1 (as highlighted) Zone 2A
Inspection of Sand bedding under pipe for Fire Water Line at Zone-C including branch - as highlighted (S
Inspection for Blinding Concrete under Fire Water Line Pit for C/F/16, C/F/17 at Zone-C - as highlighted
"Inspection for Blinding Concrete under Potable Water Line Pit for C/PW/06 at Zone-C - as highlighted "
Inspection of Concrete Pouring for wall and Top Slab of Corner Connection between SBC-01 & SBC-02 - (
Inspection of Formwork for wall and Top Slab of Corner Connection between SBC-01 & SBC-02 - (As High
Inspection of Steel Reinforcement for the Upstand of SBC-04 (As Highlighted)
Level and Location for Blinding of Bridge to south tower abutments wall at grid 02C Zone 7 (as highlight
Inspection of Steel Reinforcement for the Upstand of SBC-03 (As Highlighted)
Inspection of Steel Reinforcement for the Upstand of SBC-02 (As Highlighted)
Protection layer of 4mm thick bituminous protection board of CHILDCARE foundation P6, P1A, P4 Zone 2
Concreting for Strip Footing between PC 1-3-5 Zone 1A (as highlighted)
Steel Reinforcements for MCPE 3 WALL inner at axis 02S to 02R, 03-1 Zone 2E 2F (as highlighted)
Shuttering for RETAINING WALL (WALL) Axis 01I to 01J (as highlighted) Zone 1D
Concreting for RETAINING WALL (WALL) Axis 01I to 01J (as highlighted) Zone 1D
Steel Reinforcements for BUTTRESS BOI BOV 45 Zone 1L
Steel Reinforcements for Cafeteria Foundation RAFT 1 (as highlighted) Zone 2A
Shuttering for Cafeteria Foundation RAFT 1 (as highlighted) Zone 2A
Concreting for Cafeteria Foundation RAFT 1 (as highlighted) Zone 2A
Steel Reinforcements for MCPE 1 Counter fort wall at axis 03-1,03U-03T As highlighted
Concrete pouring for walls of Seat Walls (A & C) and along Whispering Cave-1 & 2 Inside Sound & Ligh
Stack Boulders Installed Layers at levels +877.08, +874.80, +875.20, 875.60 ,+876.00 and +876.50alo
Shuttering for Infill Wall at Zone 2M between Gridline 02-1AP - 02-1AO (as highlighted) (BII 110-111)
Concrete pouring for Electrical Handholes of Emergency (MH WG EM 28 to 25), (MH WG LV 44 to 47)
Anti Termite application under Blinding of Bridge to South tower abutment wall foundation at grid 02C
Shuttering for Blinding of Bridge to south tower abutments wall at grid 02C Zone 7 (as highlighted)
Inspection for Window and door opening for new ticketing booth #1A As per Attached Highlighted D
Steel Reinforcements for RETAINING WALL (WALL) Axis 01G to 01J (as highlighted) Zone 1D
Coordinates and levels for Walls of Seat Walls (A & C) and along , Inside Sound & Light garden, as pe
Coordinates and levels for walls of along Whispering Cave-1 &2, Inside Sound & Light garden, as per h
Coordinates and levels of Screed protection of water proofing for wet well( E ) ,at Water Garden as h
Steel Reinfotcmenet for wall new ticketing booth #1A As per Attached Highlighted Drawing's.
Concrete Pouring Screed protection of water proofing for wet well( E ) ,at Water Garden as highlight
Steel Reinforcement for walls of Seat Walls (A & C) and along Whispering Cave-1 & 2, Inside Sound &
Sand bedding for Irrigation Sub-Main line Distribtion network ( 50,63,110 mm ),(East of Mist & gey
Concrete pouring and shutting of starter ( Kicker ) for wall of new ticketing booth #3A As per Attach
Surface preparation prior to Backfilling Surround of (30) Low current handholes at (MH DG TC 1 to 16
Surface preparation prior to Backfilling Surround of (25) Electrical handholes at (MH DG LV 1 to 8),(
Level and Location for Tunnel 1 (1 outer left) wall part-C (as Highlighted) Zone 2H
Inspection and compaction test 3rd layer for Strip footing (outer) Zone 1P (as highlighted) axis 01AS -
Inspection and compaction test 2nd layer around Pilecap 151 at Zone 2K (as highlighted) (2nd of 4th la
Inspection of first layer Block layerout of 350mmthk(200mm wall,500 insulation & 100mm wall ) at
Inspection of Grouting (Horizontal & Vertical Joints) in Wadi-2 (RB-139) for Front and Back Side of all
Surface Preparation Prior to Water proofing for area inside Shower area , At Management Building as
"Inspection of Grouting (Horizontal Joints) for Rock Boulder - RB-312 for All Layers"
"Inspection of Grouting (Horizontal Joints) for Rock Boulder - RB-323 for All Layers"
"Inspection of Concrete (Plain) Pouring for Duct Bank of Fire & Security line from B/FS/27 to B/FS/36 a
Inspection of Reinforced Concrete Pouring for Duct Bank of Fire & Security line for B/RC-FS/17 at Zon
"Inspection of Formwork for Duct Bank of Fire & Security line from B/FS/27 to B/FS/36 at Zone-B - As
"Inspection of Steel Reinforcement for Duct Bank of Fire & Security line for B/RC-FS/17 at Zone-C - A
Inspection of Concrete (Plain) Pouring for Duct Bank of Telecommunications line from B/TL/35 to B/TL/3
Inspection of Reinforced Concrete Pouring for Duct Bank of Telecommunications line for B/RC-TL/40 a
Inspection of Formwork for Duct Bank of Telecommunications line from B/TL/35 to B/TL/36 at Zone-B
Inspection of Steel Reinforcement for Duct Bank of Telecommunications line for B/RC-TL/40 at Zone-B
Inspection of Concrete (Plain) Pouring for the Duct Bank of MV Line from G/MV/24 to G/MV/14 at Zone-
Inspection for Installation Of Isolation Fire Water Line Pit L/F/04, C/F/11, C/F/12, H/F/02, H/F/04, H/F/0
Excavation for MV Line Between B/MV/17 TO C/MV/40 at Zone-C including Pit C/MV/02 - as highlighted
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 1) above GreenTiles for Fire &
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 1) above Green Tiles for Tele
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 1) above Red Tiles for MV L
Inspection of Sand Bedding under pipe for Fire & Security Distribution Line (between B/FS/15 to B/FS/0
Inspection And Compaction Test of Backfilling Sub-grade 2nd Layer (2nd of 3) For Foul Water Line Fro
Inspection And Compaction Test of Backfilling Sub-grade 3rd Layer (3 of 6) For Foul Water Line From F
Inspection and Compaction Test for backfilling 1st Layer (1 of 1) above Green Tiles for Fire & Security
Installation of straight UPVC Conduit (Dia.32mm) for Power(Socket Outlet & FO Converter) at Crescent-
Installation of earthing clamps with conductor 70mm (2pcs.) for earthing reinforcement steel re-bar a
Installation of straight UPVC Conduit (Dia.32mm) for Power(Socket Outlet) at Crescent-01 Buttress (Axi
Installation of straight UPVC Conduit (Dia.25mm) and Box for Voice and Data (WIFI & FO Converter) at
Installation of straight UPVC Conduit (Dia.25mm) and Box for Fire Alarm (Speaker) at Buttress Axis (01
Concrete Pouring for Blinding under Low current Handholes of (MH/WG/LC/5 to 9) and (MH/WG/FA/7
Concrete Pouring for Blinding under Electrical Handholes of 10 Nos (MH/WG/EM/7 to15 & 29), (MH/W
Concrete pouring and shutring of walls for Circular wall (Remaining part) inside Maze Garden As pe
Coordinates and levels of starter ( Kicker ) for wall of new ticketing booth #3A As per Attached Highl
Level and Location for BUTTRESS BOV BIV 38, 39, 40 Zone 1K 1J
Coordinates and levels of starter for walls Circular wall (Remaining part) inside Maze Garden As per
Shuttering ans Shear Connector for BUTTRESS BOV BIV 38, 39, 40 Zone 1K 1J
Concreting for BUTTRESS BOV BIV 38, 39, 40 Zone 1K 1J
Steel Reinforcements for Infill wall between Gridline 02-2AX - 02-2AW, BO 121-122 (as highlighted) Zon
Shuttering for Tunnel 1 (1 outer left) wall part-C (as Highlighted) Zone 2H
Concreting for Tunnel 1 (1 outer left) wall part-C (as Highlighted) Zone 2H
Single layer of 4mm thk modified bituminous water proofing membrane under foundation of Diaphragm
Inspection and compaction test 4th layer for Tunnel 1 Zone 2H (as highlighted) axis 02AB - 02AA, 02-2 (
Inspection and compaction test 1st layer MCPE 3 Zone 2E 2F axis 02S (as highlighted) (1st of 1st layer f
Inspection and compaction test 1st & 2nd layer MCPE 3 Zone 2E 2F axis 02S (as highlighted) (1st of 1st
Level and Location for BUTTRESS BOV 49, 50, 51 Zone 1N 1M (as highlighted)
Inspection of Alignment for the Installed Baseplates in Crescent 02 Zone 4, 2L Inner
Level and Location for RING BEAM Zone 1G (OUTER) Axis 01-1, 01W to 01S (as highlighted)
Installation and Survey Report for Location and Levels of Anchor Bolts for RING BEAM Zone 1G (OUTER)
Geotextile and Screed under foundation of Diaphragm wall at zone 2N Axis 02AR (as highlighted)
Surface preparation of blinding prior to start Waterproofing under foundation of Wet well E, at Wat
Shuttering and Shear Connector for BUTTRESS BOV 49, 50, 51 Zone 1N 1M (as highlighted)
Concreting for BUTTRESS BOV 49, 50, 51 Zone 1N 1M (as highlighted)
Inspection of Thrust Block for HDPE Water Feature pipes at Water Garden, as highlighted area in a
Steel Reinforcements for MCPE 3 Counter fort wall at axis 03-1,02S-03D As highlighted
Excavation and Soil preparation between Boat Garden and Boundary wall, Span (12,13), inside boat
Inspection Compaction tests of 2nd Layer Backfilling (Out of 6 layers) Surround conopy footings (12 nos
Sand bedding for Low Current line (FA), at Sound & Light Garden, as highlighted area in attached dra
Sand bedding for Electric line, at Sound & Light Garden, as highlighted area in attached drawing's.
Two layers of 4mm thick modified bituminous waterproofing membrane for MCPE 4 External Wall (as hi
Surface preparation prior Waterproofing for grade beam (out face) at grid (X/3-9, 19/Q-S, Q/19-20,
Protection layer of 4mm thick bituminous protection board for MCPE 4 External Wall (as highlighted) Z
Repair of Cracks for foundation Slab of MCPE 4 (as highlighted) to close SI-S-0025-00
Surface Preparation and Base Primer Coating of CHILDCARE foundation P5 Zone 2N (as highlighted)
Two coat of bituminous damp proofing of CHILDCARE foundation P5 Zone 2N (as highlighted)
Concreting for RING BEAM Zone 1F (INNER) Axis 01-1, 01P to 01S (as highlighted)
Shuttering, Shear Connector & Scaffoldings for RING BEAM Zone 1G (OUTER) Axis 01-2, 01W to 01S (as h
Concreting for RING BEAM Zone 2E (OUTER) Axis 02-2, 02N to 02R (as highlighted)
Steel Reinforcements for RING BEAM Zone 1G (OUTER) Axis 01-2, 01W to 01S (as highlighted)
Concreting for RING BEAM Zone 2E (INNER) Axis 02-1, 02N to 02R (as highlighted)
Concreting for Infill wall BO 123-124 (as highlighted) Zone 2Q outer between Gridline 02-2AY - 02-2AZ
Concreting for Infill Wall at Zone 2N between Gridline 02-1AP - 02-1AQ (as highlighted) (BII 112-113)
Concreting for Promenade Bridge Abutment Blinding under foundation at Grid M (as highlighted)
Concrerting for Isolated Columns (C3, C4, D1.1, D2, D3, D4, E1.1) as highlighted at Large Mosque
Concreting for Blinding of Diaphragm wall at Zone 2N Axis 02R & 02Q (as highlighted)
Excavation and Bed preparation for Low Current line (FA), at Sound & Light Garden, as highlighted ar
"Excavation for Non-Potable Water Line Branches at Zone-B including Pit POC-07, POC-08, NPW-ISC-12,
Inspection And Compaction Test of Backfilling Sub-grade 4th Layer (4 of 13) For Foul Water Line Fro
"Inspection and Compaction Test for Backfilling Sub-grade 2nd Layer (2 of 2) Outside And Inside of Seatin
Inspection And Compaction Test of Backfilling Sub-grade 1st Layer (1 of 3) For Foul Water Line From F
Inspection And Compaction Test of Backfilling Sub-grade 2nd Layer (2 of 3) For Foul Water Line From F
Excavation for MV Line from C/MV/14 TO H/MV/05 at Zone-C&H including Pit C/MV/14, C/MV20, C/M
Inspection for Laying of Red Tiles above the pipe for MV Line from G/MV/38 to G/MV/13 at Zone-G - a
Inspection and Compaction for backfilling Sub-grade 3rd Layer (3 of 4) around Fire Water Line Pit F/F/
Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 4) around Potable Water Li
Steel Reinforcements for RING BEAM Zone 2L (OUTER) Axis 02-1, 02AL to 02AH (as highlighted)
Surface Preparation and Base primer coating under foundation of Diaphragm wall at zone 2N Axis 02AR
Shuttering for MCPE 3 Columns (c9 - c10 - c11 - c12 - c13 - c14 - c15 - c16) at Ground Floor axis 02S to
Concreting for MCPE 3 Columns (c9 - c10 - c11 - c12 - c13 - c14 - c15 - c16) at Ground Floor axis 02S to
Steel Reinforcements for MCPE 1 Suspended Slab and Column (as per KAIG3-SCR-CO-S-0138-01) As high
Level and Location for MCPE 3 Columns (c9 - c10 - c11 - c12 - c13 - c14 - c15 - c16) at Ground Floor axis
Inspection and compaction test 3rd layer for Tunnel 1 Zone 2H (as highlighted) axis 02AB - 02AA, 02-2 (
Inspection and compaction test 12th layer for MCPE 2 Axis (03-I to 03-E ) (as highlighted) (12th of 12
Inspection and compaction test 1st layer around Pilecap 151 at Zone 2K (as highlighted) (1st of 4th laye
Inspection and compaction test 2nd layer for Strip footing (outer) Zone 1P (as highlighted) axis 01AS -
Surface Preparation Prior to start Backfilling at MCPE 3 Zone 2E 2F axis 02S (as highlighted)
Inspection of backfilling Gravel for the Duct Bank of MV Line from F/MV/04 to G/MV/01 at Zone- F&G
Compaction Test after Excavation of EleLine at Sound & Light Garden as highlighted area in attached
Installation of straight UPVC Conduit (Dia. 25mm) and Box for Voice and Data (WIFI) at the Buttress
Installation of straight UPVC Conduit (Dia.25mm) and Box for Fire Alarm (Speaker) at the Buttress A
Installation of PVC Conduit (Dia. 25mm) for Fire Alarm (Speaker) Passing the seatwall at Physic Garde
Installation of straight UPVC Conduit (Dia. 32mm) for Power (Socket Outlet) at the Buttress Axis (01/
Inspection of Alignment for the Installed Baseplates in Crescent 02 Zone 4, 2L Outer
HDPE Pipe Installation of Water Features pipes; (50mmØ SDR11-PE100); As per High lighted Attach
Installation and Survey Report for Location and Levels of Anchor Bolts for RING BEAM Zone 1F (OUTER) A
HDPE Pipe Installation of Water Features pipes; (90 &110&250&63mmØ SDR11-PE100); As per High
Inspection and compaction test 6th layer for Strip Footing (outer) between PC 80-82-84 at Zone 1N Axis
Inspection and compaction test 1st layer for Strip footing (outer) Zone 1P (as highlighted) axis 01AS -
Inspection and compaction test 2nd layer for Tunnel 1 Zone 2H (as highlighted) axis 02AB - 02AA, 02-2
Inspection and compaction test 4th layer for backfilling of PC and STRIP FOOTING between PC 77-79 Zon
Surface Preparation Prior to start Backfilling at around PC 151 Zone 2K (as highlighted)
Surface Preparation Prior to start Backfilling at Strip footing and PC (outer) between PC 72-84 Zone 1N
Level and Location for MCPE 4 Ground wall and roof Slab at axis 01AP Zone 1N (as highlighted)
Level and Location for MCPE 1 WALL and Suspended Slab (INNER) at axis 03-1, 03-1, 03R to 03S Zone 2
Level and Location for RING BEAM Zone 1F (OUTER) Axis 01-2, 01P to 01S (as highlighted)
Compaction tests after Excavation of Low current line, at Sound & Light Garden, as highlighted area
Sand Bedding for Electric line, at Maze Garden, as highlighted area in attached drawing's.
Sand Bedding for Low current line, at Maze Garden, as highlighted area in attached drawing's.
Installation of Stone Boulder in Wadi-2 Left Side (RB-139) for Layer's Level (+868.50, +869.00, +869.5
Inspection and Compaction Test for Backfilling Sub-grade 6th Layer (6 of 8) for Storm Water Line Fr
Inspection and Compaction Test for Backfilling Sub-grade 7th Layer (7 of 8) for Storm Water Line Fr
"Inspection And Compaction Test of backfilling Sub-grade 6th Layer (6 of 8) around Manhol MH-M-07
"Inspection And Compaction Test of Backfilling Sub-grade 15th Layer (15 of 17) For Foul Water Line
Inspection And Compaction Test of Backfilling Sub-grade 14th Layer (14 of 17) For Foul Water Line Fr
Inspection And Compaction Test of Backfilling Sub-grade 12th Layer (12 of 12) For Foul Water Line Fr
Shuttering for MCPE 4 Ground wall and roof Slab at axis 01AP Zone 1N (as highlighted)
Inspection And Compaction Test of Backfilling Sub-grade 3rd Layer (3 of 13) For Foul Water Line Fro
Steel Reinforcements for RING BEAM Zone 1F (OUTER) Axis 01-2, 01P to 01S (as highlighted)
"Inspection And Compaction Test of Backfilling Sub-grade 1st Layer (1 of 1) For Foul Water Line From
Shuttering for MCPE 1 WALL and Suspended Slab (INNER) at axis 03-1, 03-1, 03R to 03S Zone 2M 2N (as
Excavation for Potable Water Line at Zone-C including branch & Pit - C/PW/01 - as highlighted
Concreting for MCPE 1 WALL and Suspended Slab (INNER) at axis 03-1, 03-1, 03R to 03S Zone 2M 2N (as
Excavation for Fire Water Line at Zone-C including branch and Pit - C/F/04 - as highlighted
Inspection of Steel Reinforcement for the Top Slab of Corner Connection between SBC-01 & SBC-02 - (As
Inspection of Sand Bedding under pipe for Fire Water Line at Zone-C - as highlighted
Shuttering, Shear Connector and Scaffoldings for RING BEAM Zone 1F (OUTER) Axis 01-2, 01P to 01S (as
Sand bedding for water feature lines (HDPE 110-63, 50mm )inside Mist Garden,at Water Garden as h
Excavation & Blinding Levels for Low current Handholes of (MH WG LC 5 to 9) and (MH WG FA 7 to 1
Excavation & Blinding Levels for Electrical Handholes of (MH WG EM 7to 15and 29) (MH WG LV 17 t
Inspection and compaction tests for 7th layer of Backfill (sub grade ) along the Boundary wall (Oute
Excavation and Bed preparation for Electric line, at Sound & Light Garden, as highlighted area in atta
Application of Primer coat for under foundation of plant room (remaining part), at Physic Garden As
Inspection and compaction test 2nd layer for Internal Building for Zone 1N Axis: 01AN - 01AP (as highli
Compaction tests after Excavation of Electric line, at Sound & Light Garden, as highlighted area in at
Inspection and compaction test 3rd layer for Strip footing and PC between PC 91-93 outer Axis: 02-2, 0
Inspection and compaction test 2nd layer for Strip footing and PC between PC 91-93 outer Axis: 02-2,
Preliminary Inspection of Erected Steel in Crescent 02, Zone 7 2B & 2C from Axis 02D to 02J
Inspection of Sand Covering Layer for Protection of Fire & Security Line from (G/FS/04 to G/FS/12) at Z
Inspection of Sand Covering Layer for Protection of Telecommunications Line from (G/TL/12 to G/TL/14
Excavation for Non-Potable Water Line from Point (E-647440.195, N-2713700.32) to Point (E-647443.05
Inspection for Installation Of Isolation Fire Water Line Pit L/F/02, L/F/03, L/F/06, H/F/07, H/F/09 - as hig
Inspection of Sand Covering Layer for Protection of MV Line from (G/MV/25 to G/MV/24) at Zone-G as h
Weld Visual & NDT Inspection for Crescent 01, Zone 5 - 1B, Axis 01D to 01G (As per the Highlighted A
"Inspection of Sand bedding under pipe for Non-Potable Water Line from Point (E-647458.14, N-27138
Inspection of Sand Bedding under pipe for Non-Potable Water Line from Thrust Block to Thrust Block a
Inspection of Casting Concrete for Short piece and Surface Preperation prior to start waterproofing
Inspection And Compaction Test of Backfilling Sub-grade 2nd Layer (2 of 13) For Foul Water Line Fr
Excavation for Foul Water Line from FW-A-3 to FW-A-4 including Manhole FW-A-4 prior to start Gravel
' Warning Tape Installation of Foul Water Line for (400mmØ - UPVC- Class 4) from (FW-A-3 to FW-A-4
' 300 mm Gravel 3/8" Backfilling and Geotextile of Foul Water Line for (400mmØ - UPVC- Class 4) fr
Installation of UPVC Conduit Sleevs (Dia. 160mm) for Low Voltage Duct Bank (Submain Cables) at the
Installation of UPVC Conduit Sleevs (Dia. 110mm) for Low Voltage Duct Bank (Lighting & Power) at th
Installation of straight UPVC Conduit (Dia.25mm) and Box for Video and Data (WIFI) at Infill Wall Ax
Installation of straight UPVC Conduit (Dia.25mm) and Box for Fire Alarm (Speaker) at Infill Wall Axis
Excavation and Bed preparation for Irrigation Sub-Main line Distribtion network (part 2) ( 50,110 mm
Application of Primer coat on Foundation and Walls for Water proofing, at Butterfly Garden, at hig
Concrete Pouring for blinding under Seat wall (outer),(small part) and blinding of plant room (Remain
Surface preparation prior to start Waterproofing of Boundary Wall (Inner & outer face) ,Span 50B, 51
Excavation and Bed preparation for Irrigation Sub-Main line Distribtion network (part 1) ( 50,63,110
Inspection Compaction tests of 1st Layer Backfilling (Out of 1 layer)under the foundation of plant ro
Preliminary Inspection of Erected Steel in Aviary Garden from Grid Line 08 to 23
Inspection of Installation and Preliminary Alignment for the Aviary Garden from Grid Line 18 to 23
Inspection Of Pipe Installation For Non-Potable Water (Irrigation Line ); (200&250mmØ- UPVC-Claas-
Level and Location for Tunnel 1 to MCPE Suspended Slab (as highlighted)
Level and Location for Retaining wall (wall kicker) at Zone 1D Axis 01G-01J (as highlighted)
Inspection and compaction test 11th layer for MCPE 2 Axis (03-I to 03-E ) (as highlighted) (11th of 12
Inspection and compaction test 3rd layer for backfilling of PC and STRIP FOOTING between PC 77-79 Zon
Inspection and compaction test 2nd layer for Internal Building Zone 2Q (as highlighted) axis 02AZ-02AX
Inspection and compaction test 5th layer for Strip Footing (outer) between PC 80-82-84 at Zone 1N Axis
Surface Preparation Prior to start Backfilling at Tunnel 1 Zone 2H (as highlighted) axis 02AB - 02AA, 02-2
Inspection for Blinding Concrete under Fire Water Line Pit for C/F/11, C/F/12, C/F/13, H/F/02, H/F/04,
Inspection for Blinding Concrete under Potable Water Line Pit for C/PW/05, C/PW/08, H/PW/02 at Zone-
Excavation for Potable Water Line at Zone-C including branch & Pit - C/PW/06 - as highlighted
Excavation for Fire Water Line at Zone-C including branch and Pit - C/F/16, C/F/17, C/F/18 - as highlight
Surface preparation prior to Backfilling of inner walls of two outer canopy 2 and 3 at Physic Garden,
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 1) above Green Tiles for Fire
Inspection and compaction test 1st layer for Tunnel 1 Zone 2H (as highlighted) axis 02AB - 02AA, 02-2 (1
Concreting for Tunnel 1 to MCPE Suspended Slab (as highlighted)
Surface Preparation and Base Primer Coating for Wall upto SOG of Large Mosque (ramp area) (as highli
Inspection and Compaction Test for backfilling Sub-grade 1st layer (1 of 1) above Green Tiles for Tele
Two coat of bituminous waterproofing coating for Wall upto SOG of Large Mosque (ramp area) (as high
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 1) above Red Tiles for MV Li
Surface preparation and Solvent base primer for MCPE 4 External Wall (as highlighted) Zone 1N
Inspection for Laying of Red Tiles above the pipe for MV Line from B/MV/11 to B/MV/02 at Zone-B as hi
Steel Reinforcements for RETAINING WALL (WALL KICKER) Axis 01G to 01J (as highlighted) Zone 1D
Shuttering for RETAINING WALL (WALL KICKER) Axis 01G to 01J (as highlighted) Zone 1D
Concreting for RETAINING WALL (WALL KICKER) Axis 01G to 01J (as highlighted) Zone 1D
Inspection and Compaction Test for Backfilling Sub-grade 5th Layer (5 of 8) for Storm Water Line Fr
Inspection and Compaction Test for Backfilling Sub-grade 6th Layer (6 of 8) for Storm Water Line Fr
"Inspection And Compaction Test of backfilling Sub-grade 5th Layer (5 of 8) around Manhol MH-M-07
"Inspection And Compaction Test of Backfilling Sub-grade 14th Layer (14 of 17) For Foul Water Line
Inspection And Compaction Test of Backfilling Sub-grade 13th Layer (13 of 17) For Foul Water Line Fr
Inspection And Compaction Test of Backfilling Sub-grade 11th Layer (11 of 11) For Foul Water Line Fr
Inspection for Laying of GreenTiles above the pipe for Fire & Security Distribution Line from K/FS/22 to
Inspection for Laying of Green Tiles above the pipe for Telecommunication Line from K/TL/12 to K/TL/03
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 1) above Green Tiles for Tele
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 1) above GreenTiles for Fire &
Inspection and Compaction for backfilling Sub-grade 2nd Layer (2 of 4) around Fire Water Line Pit F/F/
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 4) around Potable Water Li
Inspection and Compaction for backfilling Sub-grade 1st Layer (1 of 4) around Fire Water Line Pit F/F/0
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 4) around Potable Water Line P
Inspection of Sand bedding under pipe for Non-Potable Water Line from Thrust Block to Thrust Block at
Excavation for MV Line from B/MV/21 TO C/MV/30 at Zone-B&C including Pit B/MV/21, B/MV08, C/MV/
Inspection for Laying of GreenTiles above the pipe for Fire & Security Distribution Line from K/FS/10 to
Surface Preparation prior to start backfilling Sub-grade around Fire Water Line Pit F/F/03, G/F/03 at Zo
Surface Preparation prior to start backfilling Sub-grade around Potable Water Line Pit F/PW/03, F/PW/04
Protection layer of 4mm thick bituminous protection board for Wall upto SOG of Large Mosque (ramp ar
Steel Reinforcements for MCPE 4 Ground wall and roof Slab at axis 01AP Zone 1N (as highlighted)
Surface Preparation and Solvent Base Primer Coating for Retaining wall (inner) foundation at axis 01AP
Protection layer of 4mm thick bituminous protection board for MCPE 3 Wall Axis 02S, 03-2 to 03-1 (as h
Steel Reinforcements & shear connector for Tunnel 1 to MCPE Suspended Slab (as highlighted)
Shuttering for Tunnel 1 to MCPE Suspended Slab (as highlighted)
Steel Reinforcement for walls Circular wall (Remaining part) at Maze Garden As per Attached Highlig
Stack Boulders Installed Layer at Level +879.00,+880.00 and +879.50 at Bottom side of Water Play Ga
Surface preparation prior to Backfilling along the Boundary Wall (Inner side) Span 7,8,9,10 and 11 a
Concrete pouring and shutting of starter ( Kicker ) for wall of new ticketing booth #2A As per Attach
Coordinates and levels of starter ( Kicker ) for wall of new ticketing booth #2A As per Attached Highl
Coordinates and levels for Footing , along Whispering Cave-2, Inside Sound & Light garden, as per hi
Concrete pouring and Shuttring for Footing , along Whispering Cave-2, Inside Sound & Light garden,
Steel Reinforcement for Footing , along Whispering Cave-2, Inside Sound & Light garden, as per highl
Block work from Lintel upto slab for all walls Inside Public Toilet # 1, At highlighted area in attached
Concrete Pouring & Shuttering for Stiffener of Doors & Block work & Stiffner Column's for all walls In
Steel Reinforcement & Shuttering for Stiffener of Doors & Block work & Stiffner Column's for all walls
Steel Reinforcement for WALLS of Plant Room at Physic Garden, at highlighted area in attached draw
Steel Reinforcements for MCPE 4 WALL at axis 01AP Zone 1N (as highlighted) (Small area balance)
Shuttering and shear Connecrtor for Infill Wall between BII BIV 27 - 28 Gridline 01-1V - 01-1U ZONE 1G
Installation of earthing clamps with conductor 70mm (2pcs.) for earthing reinforcement steel re-bar at
Stack Boulders Installed Layers at levels +874.80, +876.00, +876.50, 877.00 and +877.45 along Open
Stone Cladding for Boundary wall (Inner Face & outer) @ Span 2 & Column @ Span 1 of Water Garden
Stone Coping on Boundary walls at Elevation F E D I Whispering Cave-2 Sound & Light Garden As pe
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) above sand cover (Out of 2 layer
Surface preparation prior to Backfilling along the Boundary Wall (Inner side) Inside Physic Garden, as
Installation of straight UPVC Conduit (Dia.25mm) and Box for Fire Alarm (Speaker) at Infill Wall Axis
Inspection of Reinforced Concrete Pouring for the Duct Bank of MV Line from F/MV/01 to F/MV/08 at
Inspection of Formwork for the Duct Bank of MV Line from F/MV/01 to F/MV/08 at Zone-F (As Highlig
Inspection of Steel Reinforcement for the Duct Bank of MV Line from F/MV/01 to F/MV/08 at Zone-F (
Surface Preparation prior to start backfilling Sub-grade around Potable Water Line Pit for F/PW/06 at Zo
"Inspection of Concrete Pouring for the Wing Wall ( F1 & F2) of SBC-03 (As Highlighted)"
Inspection of Formwork for the Wing Wall ( F1 & F2) of SBC-03 (As Highlighted)
"Inspection and Compaction Test for Backfilling Sub-grade 1st Layer (1 of 2) Outside And Inside of Seatin
"Excavation for Non-Potable Water Line Branches at Zone-G&K including Pit POC-27, POC-NPW, POC-28,
Level and Location for Strip Footing between PC 143-145 Zone 2H (as highlighted)
Level and Location for Infill Wall between Gridline 02-1/X - 02-1/Y Zone 2G (as highlighted)
Level and Location for Cafeteria Foundation P1, 2, 3 & 4, RAFT 3 & 4(as highlighted) Zone 2A
Surface Preparation Prior to start Backfilling at Strip footing (outer) Zone 1P (as highlighted) axis 01AS
Inspection and compaction test 10th layer for MCPE 2 Axis (03-I to 03-E ) (as highlighted) (10th of 12
Inspection and compaction test 4th layer for Strip Footing (outer) between PC 80-82-84 at Zone 1N Axis
Shuttering for Retaining wall (wall) at Zone 1D Axis 01K-01J (as highlighted)
Steel Reinforcements for Strip Footing between PC 143-145 Zone 2H (as highlighted)
Shuttering for Strip Footing between PC 143-145 Zone 2H (as highlighted)
Steel Reinforcements & Shear Connector for Infill Wall at Zone 2M between Gridline 02-1AP - 02-1AO (as
Steel Reeinforcements for MCPE 4 Wall Counter fort at Axis 02R to 03A (as highlighted) (871.00)
Shuttering & shear Connector for Infill Wall between Gridline 02-1/X - 02-1/Y Zone 2G (as highlighted)
Steel Reeinforcements for Promenage Bridge Abutment Wall at Grid P Zone 4
Shuttering for Cafeteria Foundation P1, 2, 3 & 4, RAFT 3 & 4(as highlighted) Zone 2A
Concreting for Cafeteria Foundation P1, 2, 3 & 4, RAFT 3 & 4(as highlighted) Zone 2A
Steel Reeinforcements for Cafeteria Foundation P1, 2, 3 & 4, RAFT 3 & 4(as highlighted) Zone 2A
Installation and Survey Report for Location and Levels of Anchor Bolts for RING BEAM Zone 2E (INNER) A
Level and Location for Infill Wall at Zone 2N between Gridline 02-1AP - 02-1AQ (as highlighted) (BII 112
Level and Location for Isolated Columns (D-2, D-5, B1-2, B1-5 ) as highlighted at Large Mosque
Level and Location for Blinding of Diaphragm wall at Zone 2N Axis 02R & 02Q (as highlighted)
Level and Location for Infill wall between BO 123-124 (as highlighted) Zone 2Q outer between Gridline
Level and Location for RING BEAM Zone 2E (INNER) Axis 02-1, 02N to 02R (as highlighted)
Level and Location for RETAINING WALL FOUNDATION Axis 01G to 01J (as highlighted) Zone 1D
Steel Reeinforcements for Buttress BOI BOV, BII BIV 46, 47 Zone 1L 1M (as highlighted)
Shuttering for Infill Wall at Zone 2N between Gridline 02-1AP - 02-1AQ (as highlighted) (BII 112-113)
Concreting for Isolated Columns (D-2, D-5, B1-2, B1-5 ) as highlighted at Large Mosque
Shuttering for Blinding of Diaphragm wall at Zone 2N Axis 02R & 02Q (as highlighted)
Shuttering for Infill wall BO 123-124 (as highlighted) Zone 2Q outer between Gridline 02-2AY - 02-2AZ
Shuttering for Isolated Columns (D-2, D-5, B1-2, B1-5 ) as highlighted at Large Mosque
Steel Reinforcements for RING BEAM Zone 2E (INNER) Axis 02-1, 02N to 02R (as highlighted)
Two layers of 4mm Thick Modified Bituminous waterproofing membrane for MCPE 3 Wall Axis 02S, 03-2
Shuttering, Shear Connector and Scaffolding for RING BEAM Zone 2E (INNER) Axis 02-1, 02N to 02R (as h
Steel Reinforcements for RETAINING WALL FOUNDATION Axis 01G to 01J (as highlighted) Zone 1D
Shuttering for RETAINING WALL FOUNDATION Axis 01G to 01J (as highlighted) Zone 1D
Concreting for RETAINING WALL FOUNDATION Axis 01G to 01J (as highlighted) Zone 1D
Protection layer of 4mm thick bituminous protection board under Retaining Wall foundation (as Highli
' Pipe Installation of Foul Water Line for (400mmØ - UPVC- Class 4) from (FW-A-3 to FW-A-4 & A-3 to
Inspection and compaction test 1st layer for Internal Building Zone 2Q (as highlighted) axis 02AZ-02AX (
'Bedding of Gravel 3/8" and Geotextile Surrounding Foul Water Line for (400mmØ - UPVC- Class 4) fr
Inspection and compaction test 4th layer for Strip footing (side) Zone 1N between PC 79-81 (as highligh
Inspection and compaction test 2nd layer for backfilling of PC and STRIP FOOTING between PC 77-79 Zon
Inspection and compaction test 9th layer for MCPE 2 Axis (03-I to 03-E ) (as highlighted) (9th of 12th
Inspection and compaction test 4th layer for Internal Building (2nd part) for Zone 1N Axis 01AN - 01AP (
Inspection and compaction test 6th layer for Internal Building for Zone 1N Axis: 01AN - 01AP (as highlig
Installation of straight UPVC Conduit (Dia.160mmx4) Medium Voltage Ductbank no. GG/D-MV/22 (Manh
Installation of straight UPVC Conduit (4x110mm) for Low Current (TELECOM) Ductbank no.GG/D-TL/06 (
Installation of straight UPVC Conduit (2x110mm) for Low Current (Fire and Security) Ductbank no.G
Installation of straight UPVC Conduit (Dia.25mm) and Box for Security (CAM) at Infill Wall Axis (bet
Installation of straight UPVC Conduit (Dia.25mm) and Box for Fire Alarm (Speaker) at Infill Wall Axis
Installation of straight UPVC Conduit (Dia.25mm) and Box for Video and Data (CAM) at Infill Wall Ax
Inspection for Blinding Concrete under Fire Water Line Pit for H/F/06, H/F/07, H/F/09, H/F/12, L/F/01, L
Inspection for Blinding Concrete under Potable Water Line Pit for H/PW/03, L/PW/01, L/PW/02, L/PW/0
Inspection and Compaction Test for Backfilling Sub-grade 4th Layer (4 of 8) for Storm Water Line Fr
Inspection and Compaction Test for Backfilling Sub-grade 5th Layer (5 of 8) for Storm Water Line Fr
"Inspection And Compaction Test of backfilling Sub-grade 4th Layer (4 of 8) around Manhol MH-M-07
Concrete Pouring of blinding for wet well( E ) ,at Water Garden as highlighted area in attached drawin
"Inspection And Compaction Test of Backfilling Sub-grade 13th Layer (13 of 17) For Foul Water Line
Inspection And Compaction Test of Backfilling Sub-grade 12th Layer (12 of 17) For Foul Water Line Fr
Inspection And Compaction Test of Backfilling Sub-grade 10th Layer (10 of 14) For Foul Water Line Fr
Coordinates and levels of blinding for wet well( E ) ,at Water Garden as highlighted area in attached d
Inspection and Compaction for backfilling Sub-grade 1st Layer (1 of 4) around Fire Water Line Pit F/F/0
Coordinates and levels for Columns of Boundary wall (C- 50A, C-50B,C- 51,C- 52,C-53,C-54 and C- 55 )
Steel Reinforcement for walls of Seat Walls (Left Side) (Outer), Inside Physic garden, as highlighted a
Concrete Pouring for Columns of Boundary wall (C- 50A, C-50B,C- 51,C- 52,C-53,C-54 and C- 55 ) As p
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 4) around Potable Water Li
Concrete pouring for Footing of Seat Walls (A & C) and along Whispering Cave-1, Inside Sound & Light
Inspection and compaction test 8th layer for MCPE 3 Zone 2E 2F axis 02S-02R (as highlighted) (8th of 8
Excavation for Fire & Security Distribution Line from (between B/FS/15 to B/FS/06) including Pit B/FS/0
Inspection and compaction tests for 6th layer of Backfill (out of 8 layers ) (sub grade ) along the Bou
Inspection of Sand Bedding under pipe for Fire Water Line at Zone-C,H,L including branch - as highlighte
Inspection and compaction test 8th layer for MCPE 2 Axis (03-I to 03-E ) (as highlighted) (8th of 12th
Inspection of Sand Bedding under pipe for Potable Water Line at Zone-C,H,L including branch - as highl
Inspection Compaction tests of 1st Layer Backfilling (Out of 6 layers) Surround conopy footings (12 no
Surface Preparation Prior to start Backfilling at Internal Building Zone 2Q (as highlighted) axis 02AZ-02A
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) above sand cover (Out of 2 layers
Excavation and Bed preparation for water feature lines (part 4-1) (HDPE 110-63 mm )inside Mist Gar
Inspection & Compaction tests of 5th Layer Backfilling (Sub-Grade) above sand cover (Out of 5 laye
Level and Location for CHILDCARE foundation P5 Zone 2N (as highlighted)
Steel Reinforcement for Infill Wall at Zone 2N between Gridline 02-1AP - 02-1AQ (as highlighted) (BII 11
Steel Reeinforcements for Buttress BOI BOV 40, 41 Zone 1K (as highlighted)
Steel Reinforcements CHILDCARE foundation P5 Zone 2N (as highlighted)
Shuttering for CHILDCARE foundation P5 Zone 2N (as highlighted)
Concreting for CHILDCARE foundation P5 Zone 2N (as highlighted)
Survey for MCPE 1 of Column C-10-11-12-13-14-15-16-17-18-19-20 & 21 at axis 03R to 03U Zone 2M 2
Concrete Pouring for MCPE 1 of Column C-10-11-12-13-14-15-16-17-18-19-20 & 21 at axis 03R to 03U
Shuttering for MCPE 1 of Column C-10-11-12-13-14-15-16-17-18-19-20 & 21 at axis 03R to 03U Zone
Concreting for Retaining wall (wall) at Zone 1D Axis 01K-01J (as highlighted)
Installation of UPVC Conduit Sleevs (Dia. 110mm) for Low Current Duct Bank (ICT) at the Crescent-02
Installation of UPVC Conduit Sleevs (Dia. 110mm) for Low Current Duct Bank (FA & Security) at the C
Installation of UPVC Conduit Sleevs (Dia. 110mm) for Low Current Duct Bank (Fiber Optic & Spare) at
Installation of UPVC Conduit Sleevs (Dia. 110mm) for Low Current Duct Bank (Fire & Security) at the
Inspection of Formwork for the Wing Wall of SBC-02 (As Highlighted)
Inspection of Steel Reinforcement (Horizontal) for the Wing Walls of SBC-04 (As Highlighted)
Installation of PVC Conduit (Dia. 25mm) for Voice and Data (WIFI & CAM) Passing the seatwall at Sou
"Inspection of Grouting (Horizontal Joints) for Rock Boulder - RB-260 for All Layers"
"Inspection of Grouting (Vertical Joints) for Rock Boulder - RB-260 for All Layers"
Inspection of Waterproofing for Duct Bank of Fire & Security line between G/FS/08 to G/FS/30 at Zone-G
Surface Preparation prior to strart waterproofing for Duct Bank of Fire & Security line between G/FS/0
Inspection of water proofing for the Duct Bank of Telecommunications Line between G/TL/44 to G/TL/50
Surface Preparation prior to start water proofing for the Duct Bank of Telecommunications Line betwe
Inspection And Compaction Test of Backfilling Sub-grade 1st Layer (1 of 13) For Foul Water Line From
Inspection and Compaction Test for backfilling Sub-base 1st Layer (1 of 1) under Boulder No. RB-141 (Sto
Level and Location for Promenade Bridge Abutment Foundation (to Wadi between gridlines 01M) (as hig
Inspection and Compaction Test for Backfilling Sub-grade 1st Layer (1 of 1) above Gravel around Manho
Level and Location for Retaining wall (wall) at Zone 1D Axis 01K-01J (as highlighted)
Inspection and Compaction Test for backfilling Sub-grade above gravel 2nd Layer (2 of 2) around Manhol
Inspection and Compaction Test for Backfilling Sub-grade above gravel 2nd Layer (2 of 2) around Manh
Steel Reinforcements for Promenade Bridge Abutment Foundation (to Wadi between gridlines 01M) (as
Shuttering for Promenade Bridge Abutment Foundation (to Wadi between gridlines 01M) (as highlighted
Concreting for Promenade Bridge Abutment Foundation (to Wadi between gridlines 01M) (as highlighte
Inspection and compaction test 4th layer for Backfilling ( 3m external ) around LARGE MOSQUE (as H
Inspection and compaction test 7th layer for MCPE 2 Axis (03-I to 03-E ) (as highlighted) (7th of 12th
"Inspection of Grouting (Horizontal Joints) for Rock Boulder - RB-058 for All Layers"
Stack Boulders Installed Layers at levels +877.85, +877.45, +877.00, 874.80 , +875.20 and +875.60 al
"Inspection of Grouting (Vertical Joints) for Rock Boulder - RB-058 for All Layers"
"Inspection of Grouting (Horizontal Joints) for Rock Boulder - RB-169 for All Layers"
Inspection of Reinforced Concrete Pouring for Duct Bank of Fire & Security line for C/RC-FS/34, C/RC
"Inspection of Formwork for Duct Bank of Fire & Security line for C/RC-FS/34, C/RC-FS/35, C/RC-FS/3
"Inspection of Steel Reinforcement for Duct Bank of Fire & Security line for C/RC-FS/34, C/RC-FS/35
Inspection of Reinforced Concrete Pouring for Duct Bank of Telecommunications line for B/RC-TL/35 a
Steel Reinforcement for Columns of Boundary wall (C- 50A, C-50B,C- 51,C- 52,C-53,C-54 and C- 55 )
Inspection of Formwork for Duct Bank of Telecommunications line for B/RC-TL/35 at Zone-C - As Highl
Surface Preparation prior to start backfilling gravel around Fire Water Line Pit F/F/09, F/F/04, F/F/10,
Surface Preparation prior to start backfilling gravel around Potable Water Line Pit F/PW/08, F/PW/07
Excavation for Potable Water Line at Zone-C,H,L including branch & Pit - C/PW/05, C/PW/06, H/PW/
Excavation for Fire Water Line at Zone-C,H,L including branch and Pit - C/F/11, C/F/12, C/F/13, H/F/02,
Inspection of Steel Reinforcement for Duct Bank of Telecommunications line for B/RC-TL/35 at Zone-C
Excavation for Non-Potable Water Line from Thrust Block to near Thrust Block at Zone-G as highlighted
Excavation for Non-Potable Water Line from Thrust Block to Thrust Block at Zone-B&G as highlighted in
Excavation and Bed preparation for wet well( E ) ,at Water Garden as highlighted area in attached dra
"Soil Preparation prior to start Backfilling Outside And Inside Of Seating Area SA: 2-31, SA: 2-17, SA: 3-
'Steel Reinforcement for Infill Wall between BII BIV 27 - 28 Gridline 01-1V-01-1U Zone 1G.
Inspection of Concrete Pouring for the Wing Wall of SBC-04 (As Highlighted)
Inspection of Formwork for the Wing Wall of SBC-04 (As Highlighted)
Inspection and Compaction Test for Backfilling Sub-grade 3rd Layer (3 of 8) for Storm Water Line Fr
Inspection and Compaction Test for Backfilling Sub-grade 4th Layer (4 of 8) for Storm Water Line Fr
"Inspection And Compaction Test of backfilling Sub-grade 3rd Layer (3 of 8) around Manhol MH-M-07
"Inspection And Compaction Test of Backfilling Sub-grade 12th Layer (12 of 17) For Foul Water Line
Inspection And Compaction Test of Backfilling Sub-grade 11th Layer (11 of 17) For Foul Water Line Fr
Inspection And Compaction Test of Backfilling Sub-grade 9th Layer (9 of 14) For Foul Water Line From
Inspection of Water Proofing for the Duct Bank of MV Line from F/MV/06 to F/MV/11 at Zone- F (As Hig
Surface Preparation prior to start Water Proofing for the Duct Bank of MV Line from F/MV/06 to F/MV/1
Inspection of Concrete (Plain) Pouring for the Duct Bank of MV Line from F/MV/06 to F/MV/11 at Zone-F
Inspection and Compaction Test for Backfilling Sub-grade 1st Layer (1 of 1) above Red Tiles for MV Li
Inspection for Laying of Red Tiles above the pipe for MV Line from F/MV/11 to F/MV/04 at Zone-F as hi
Inspection and Compaction Test for backfilling sub-grade 4th Layer (4 of 5) above the Sand cover for Fi
Inspection and Compaction Test for backfilling sub-grade 4th Layer (4 of 5) above the Sand cover for P
Inspection and Compaction Test for 10th Layer (10 of 10) Backfilling under Boulder No. RB-141 (Stock Pil
"Inspection of Sand Bedding under pipe for Non-Potable Water Line from Point (E-647312.1368, N-2714
' Warning Tape Installation of Foul Water Line for (200mmØ - UPVC- Class 4) from (FW-A-3 to FW-A-3
' Warning Tape Installation of Foul Water Line for ((315mmØ - UPVC- Class 4) from (FW-A-3-6 to FW-
' 300 mm Gravel 3/8" Backfilling and Geotextile of Foul Water Line for (200mmØ - UPVC- Class 4) fr
' 300 mm Gravel 3/8" Backfilling and Geotextile of Foul Water Line for (315mmØ - UPVC- Class 4) fr
Weld Visual & NDT Inspection for Crescent 02, Zone 6 2D & Zone 7 2C - Axis 02J to 02N
Surface Preparation Prior to Structural repair (with "LA extra") at External Elevations at Site Tower
Steel Reinforcements for MCPE 1 counterfort (INNER) at axis 03R to 03S Zone 2M 2N (as highlighted)
Steel Reinforcements for MCPE 4 Suspended Slab at axis 01AP Zone 1N (as highlighted) (886.515)
Concrete pouring for Blinding under along Whispering Cave-2, Inside Sound & Light garden, as per hig
Surface Preparation and Solvent Base Primer for MCPE 3 Wall Axis 02S, 03-2 to 03-1 (as highlighted) Zo
Surface Preparation and Solvent Base Primer under Retaining Wall foundation (as Highlighted) ZONE 1D
Steel Reinforcement for Footing of Seat Walls (A & C) and along Whispering Cave-1, Inside Sound & Li
Cementitious waterproofing under Retaining Wall foundation (as Highlighted) ZONE 1D Axis 01J to 01K
Coordinates & Levels for Blinding under along Whispering Cave-2, Inside Sound & Light garden, as per
Coordinates and levels for Footing of Seat Walls (A & C) and along Whispering Cave-1, Inside Sound &
Excavation and Surface preparation for Blinding under along Whispering Cave-2, Inside Sound & Light
Inspection & Compaction tests of 4th Layer Backfilling (Sub-Grade) above sand cover (Out of 5 laye
Sand bedding for water feature lines (HDPE 110-63, 50mm )inside Mist Garden,at Water Garden as hi
Level and Location for Wall (upto SOG only) for Large Mosque ZONE 1G (as highlighetd) between axis E,
Steel Reinforcements for Strip Footing Wall (upto SOG only) for Large Mosque ZONE 1G (as highlighetd)
Shuttering for Strip Footing Wall (upto SOG only) for Large Mosque ZONE 1G (as highlighetd) between axi
Concreting for Strip Footing Wall (upto SOG only) for Large Mosque ZONE 1G (as highlighetd) between ax
HDPE Pipe Installation of Water Features pipes; (90 &110mmØ SDR11-PE100); As per High lighted A
Installation of straight UPVC Conduit (Dia.32mm) for Power(Socket Outlet) at Crescent-01 Buttress (Axi
Installation of straight UPVC Conduit (Dia.32mm) for Power(Socket Outlet) at Crescent-01 Buttress (Axi
Installation of straight UPVC Conduit (Dia.25mm) and Box for Fire Alarm (Speaker) at Buttress Axis (0
Installation of straight UPVC Conduit (Dia.25mm) and Box for Fire Alarm (Speaker) at Buttress Axis (0
Installation of straight UPVC Conduit (Dia.25mm) and Box for Security (CAM) at Buttress Axis (01/1AF)
Installation of straight UPVC Conduit (Dia.25mm) and Box for Voice and Data (WIFI &CAM) at Buttress
Inspection and compaction test 2nd & 3rd layer for Strip footing (side) Zone 1N between PC 79-81 (as h
Inspection and compaction test 2nd & 3rd layer for Internal Building (2nd part) for Zone 1N Axis 01AN -
Inspection and compaction test 4th & 5th layer for Internal Building for Zone 1N Axis: 01AN - 01AP (as h
Installation of straight UPVC Conduit (2x110mm) for Low Current (Fire & Security) Ductbank no.B
Excavation and Bed preparation for Electric line, at Maze Garden, as highlighted area in attached dra
Installation and Survey Report for Location and Levels of Anchor Bolts for RING BEAM Zone 2E (OUTER) A
Surface preparation prior to Backfilling Surround conopy footings (12 nos ) at grid (A & B / 3 to 8 ) a
Inspection and compaction test 1st layer for backfilling of PC and STRIP FOOTING between PC 77-79 Zon
Level and Location for Isolated Columns (C3, C4, D1.1, D2, D3, D4, E1.1) as highlighted at Large Mosque
Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Grade) above sand cover (Out of 5 laye
Level and Location for RING BEAM Zone 2E (OUTER) Axis 02-2, 02N to 02R (as highlighted)
Steel Reinforcements for Ground Beam between PC 80-82 Zone 1N (as highlighted)
Stack Boulders Installed Layer at level +876.45, +876.05 and 876.25, At Bottom Left Side of Mist Gard
Steel Reinforcements for RING BEAM Zone 2E (OUTER) Axis 02-2, 02N to 02R (as highlighted)
Shuttering for Isolated Columns (C3, C4, D1.1, D2, D3, D4, E1.1) as highlighted at Large Mosque
Shuttering, Shear Connector and Scaffolding for RING BEAM Zone 2E (OUTER) Axis 02-2, 02N to 02R (as
Installation of straight UPVC Conduit (4x110mm) for Low Current (Telecommunication) Ductbank no
Stack Boulders Installed Layer at Level +879.00,+880.00 and +879.50 at Bottom side of Water Play Ga
Inspection of Steel Reinforcement (Horizontal) for the Wing Walls of SBC-03 - (As Highlighted)
Excavation for Non-Potable Water Line from Point (E-647458.14, N-2713872.795) to Point (E-647482.7
Steel Reinforcements for Isolated Columns (C3, C4, D1.1, D2, D3, D4, E1.1) as highlighted at Large Mosq
Grouting of Installed Anchor bolt and under Baseplate at Zone 1B OUTER ring beam (as highlighted)
Grouting of Installed Anchor bolt and under Baseplate at Zone 1B OUTER ring beam (as highlighted) u
Grouting of Installed Anchor bolt and under Baseplate at Zone 1D OUTER ring beam (as highlighted)
Grouting of Installed Anchor bolt and under Baseplate at Zone 1D OUTER ring beam (as highlighted) u
Inspection of Sand Bedding Under Pipe For Non-Potable Water Line from Near NPW-ISC-14 to Near POC
Inspection and Compaction Test for backfilling sub-grade 3rd Layer (3 of 5) above the Sand cover for Fi
ack Boulders Installed Layers at levels +872.80, +873.20, 874.40, 874.00 and +873.60 , along Open Ch
Inspection and Compaction Test for backfilling sub-grade 3rd Layer (3 of 5) above the Sand cover for P
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 1) above GreenTiles for Fire &
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 1) above Green Tiles for Tel
Inspection and Compaction Test for 9th Layer (9 of 10) Backfilling under Boulder No. RB-141 (Stock Pile #
Inspection and Compaction Test for NGL of Non-Potable Water Line at Zone-4A - as highlighted in the a
Geotextile and Screedd under Strip Footing Between PC 143-145 Zone 2H (as Highlighted)
' Pipe Installation of Foul Water Line for (315mmØ - UPVC- Class 4) from (FW-A-3 to FW-A-3-1). At C
'Bedding of Gravel 3/8" and Geotextile Surrounding Foul Water Line for (315mmØ - UPVC- Class 4) f
Installation of soil, waste & vent and rain water pipes; CI pipes (50, 75, & 100mmØ) as per high lighte
Inspection and compaction test 1st layer for Strip footing (side) Zone 1N between PC 79-81 (as highlight
Inspection and compaction test 7th layer for MCPE 3 Zone 2E 2F axis 02S-02R (as highlighted) (7th of 8
Inspection and compaction test 3rd layer for Internal Building for Zone 1N Axis: 01AN - 01AP (as highlig
Inspection and compaction test 1st layer for Internal Building (2nd part) for Zone 1N Axis 01AN - 01AP (
Surface Preparation Prior to start Backfilling at PC and STRIP FOOTING between PC 77-79 Zone 1N (as hi
Level and Location for Excavation for Diaphragm Wall Foundation Zone 2N (as highlighted)
Level and Location for BUTTRESS BIV BOV 48 Zone 1M
Level and Location for MCPE 4 Suspended Slab at axis 01AP Zone 1N (as highlighted) (886.515)
Shuttering for MCPE 4 Suspended Slab at axis 01AP Zone 1N (as highlighted) (886.515)
Installation of Rock and Boulder No. RB-058 - 4th layer (4 of 4)
Protection layer of 4mm tick bituminous protection board under Retaining Wall (as Highlighted) ZONE
Installation of Rock and Boulder No. RB-058 - 3rd layer (3 of 4)
Steel Reinforcements for BUTTRESS BOI BOV BII BIV 40, 41, 42, 43, 44, 45 Zone 1K 1L
Excavation for Non-Potable Water Line from Near NPW-ISC-14 to Near POC-15 including Pit NPW-ISC-12
Inspection for Blinding Concrete under Fire & Security Line Pit G/FS/22, G/FS/06, G/FS/05, G/FS/01, G/F
Concreting for RING BEAM Zone 2L (OUTER) Axis 02-1, 02AL to 02AH (as highlighted)
Inspection for Blinding Concrete under Telecommunication Line Pit G/TL/09, G/TL/06, G/TL/07, G/TL/08,
Shuttering and Shear Connector for BUTTRESS BIV BOV 48 Zone 1M
Concreting for BUTTRESS BIV BOV 48 Zone 1M
Inspection for Laying of GreenTiles above the pipe for Fire & Security Distribution Line from B/FS/31 t
Grouting of Installed Anchor bolt and under Baseplate at Zone 1C OUTER ring beam (as highlighted)
Inspection for Laying of Green Tiles above the pipe for Telecommunication Line from B/TL/32 to G/TL/0
Grouting of Installed Anchor bolt and under Baseplate at Zone 1C OUTER ring beam (as highlighted) u
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 1) above GreenTiles for Fire &
Inspection and Compaction test for backfilling Sub-grade 1st Layer (1 of 1) above Green Tiles for Tele
Inspection and Compaction Test for Backfilling Sub-grade 2nd Layer (2 of 8) for Storm Water Line Fr
Inspection and Compaction Test for Backfilling Sub-grade 3rd Layer (3 of 8) for Storm Water Line Fr
"Inspection And Compaction Test of backfilling Sub-grade 2nd Layer (2 of 8) around Manhol MH-M-0
Inspection And Compaction Test of Backfilling Sub-grade 11th Layer (11 of 14) For Foul Water Line Fr
Inspection And Compaction Test of Backfilling Sub-grade 11th Layer (11 of 14) For Foul Water Line F
Inspection And Compaction Test of Backfilling Sub-grade 11th Layer (11 of 14) For Foul Water Line F
Inspection And Compaction Test of Backfilling Sub-grade 11th Layer (11 of 13) For Foul Water Line F
Inspection And Compaction Test of Backfilling Sub-grade 10th Layer (10 of 14) For Foul Water Line Fr
Inspection And Compaction Test of Backfilling Sub-grade 8th Layer (8 of 14) For Foul Water Line From
Inspection and Compaction Test for backfilling sub-grade 2nd Layer (2 of 2) above the Sand cover for
Inspection and Compaction Test for backfilling sub-grade 4th Layer (4 of 4) above the Sand cover for F
Inspection and Compaction Test of Backfilling Sub-grade 3rd Layer (3 of 3) for Foul Water Line From F
Inspection and Compaction Test of Backfilling Sub-grade 3rd Layer (3 of 3) for Foul Water Line From F
Inspection and Compaction Test for 8th Layer (8 of 10) Backfilling under Boulder No. RB-141 (Stock Pile #
Inspection of Concrete Pouring for the Wing Wall of SBC-02 (As Highlighted)
Surface preparation and Compaction blinding of Electrical Handholes of Emergency (MH/WG/EM/27),
Excavation & Blinding Levels for Manholes of (MH/ZG/TC/06) and (MH/ZG/LV/09 ), at Maze Garden, as
Excavation & Blinding Levels for Manholes of (MH/SG/TC/01) and (MH/SG/FA/01 ), at Sound & Light Ga
Excavation and Bed preparation for water feature lines (HDPE 110-63, 50mm )inside Mist Garden,at
Coordindtes and levels for Footings of Seat Walls (Right Side) (Outer), Inside Physic garden, as highli
Concerte pouring for Footings of Seat Walls (Right Side) (Outer), Inside Physic garden, as highlighted
Steel Reinforcement for Footings of Seat Walls (Right Side) (Outer), Inside Physic garden, as highligh
Inspection and compaction test 3rd layer of subgrade (out of 5 layers ) for Backfilling Surround the
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 3 layers) Surround the Man
Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Grade) (Out of 3 layers) along the Bound
Inspection & Compaction tests of 5th Layer Backfilling (Sub-Grade) (Out of 6 layers) along the Bound
Sandblasting of existing Steel Reinforcement for Boundary Wall, Span #35-37.
Installation of earthing clamps with conductor 70mm (1pc.) for earthing reinforcement steel re-bar
Installation of Orange Warning Tape for Low Current Duct Bank (UPVC Conduit dia. 110mm - TELEC
Installation of straight UPVC Conduit (Dia.32mm) for Power(Socket Outlet) at Crescent-01 Buttress (Axi
Installation of earthing clamps with conductor 70mm (1pc.) for earthing reinforcement steel re-bar at
Installation of Orange Warning Tape for Low Current Duct Bank (UPVC Conduit dia. 110m mm- Fire
Installation of Yellow Warning Tape for Medium Voltage Ductbank (UPVC Conduit Dia.160mm) at Nor
Concrete pouring and shutring of starter ( Kicker ) for Circular wall (Remaining part) inside Maze G
Concrete pouring and shutting of starter ( Kicker ) for wall of new ticketing booth #1A As per Attache
Installation of straight UPVC Conduit (Dia.25mm) and Box for Voice and Data (WIFI) at Buttress Axis (
Installation of straight UPVC Conduit (Dia.25mm) and Box for Fire Alarm (Speaker) at Buttress Axis (0
Concrete pouring and shuttring for Wall of new ticketing booth #7A As per Attached Highlighted Dra
Cocrete puring and shuttring for Walls of Boundary wall Span 50B, 51, 52,53,54 and 55 As per Attac
Coordinates and levels of starter ( Kicker ) for wall Circular wall (Remaining part) inside Maze Garde
Coordinates and levels of starter ( Kicker ) for wall of new ticketing booth #1A As per Attached Highl
Coordinates and Levels for Wall of new ticketing booth #7A As per Attached Highlighted Drawing's.
Coordinates and Levels for Walls of Boundary wall Span 50B, 51, 52,53,54 and 55 As per Attached Hi
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) above sand cover (Out of 5 lay
Excavation & Blinding Levels for Electrical Handholes of Emergency (MH/WG/EM/28 to 25), (MH/WG/L
Concerte poring for Walls & Columns on Internal foundations, Inside Butterfly Garden, at highlight
Concrete pouring for Blinding under Seat Walls (A & C) and along Whispering Cave-1, Inside Sound &
2nd layer Gravel Backfilling Surround the Manhole (MH-D-01-A1-02-01) Inside Maze garden, as per hig
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) above sand cover (Out of 5 laye
Inspection & Compaction tests of 1st Layer Backfilling (Out of 6 layers) Surround conopy footings (4 n
Installation PVC Conduit & Box for Fire Alarm System (Break Glass, Flashing Beacon & Speaker) at Lar
Sand Bedding forWater Feature lines (90mm and 110mm HDPE) from center to outer side of the plant
Installation and Survey Report for Location and Levels of Anchor Bolts for RING BEAM Zone 1F (INNER) A
Level and Location for RING BEAM Zone 1F (INNER) Axis 01-1, 01P to 01S (as highlighted)
Surface Preparation Prior to start Backfilling for Childcare (as highlighted) Zone 2N
Inspection and compaction test 5th layer for Strip footing and PC between PC 91-93 outer Axis: 02-2, 0
Inspection and compaction test 3rd layer for Backfilling ( 3m external ) around LARGE MOSQUE (as H
Inspection and compaction test 6th layer for MCPE 3 Zone 2E 2F axis 02S-02R (as highlighted) (6th of 8
Inspection and compaction test 11th layer for MCPE 2 Zone 2H 2J 2K axis ( AH - AB ) (as highlighted) (
Steel Reinforcements for Infill Wall Between BII BIV 86-87 (INNER) as highlighted Zone 2G between Grid
Shuttering for Infill Wall between Gridline 01-1/T - 01-1/U Zone 1G (as highlighted)
Steel Reinforcements (Implant) for MCPE 1 Suspended Slab and Column (as per KAIG3-SCR-CO-S-0138-01
Single layer of 4mm thick modified bituinous waterproofing membrane for Strip Footing Between PC 82
Steel Reinforcements for Isolated Columns (B-2, B-5, B1-2, B1-5, E-3, E-4) as highlighted at Large Mosqu
Steel Reinforcements for Infill Wall at Zone 2H between BI 90-91 between Gridline 02-1Y- 02-1Z (as hig
Concrete Pouring for Footings of Seat Walls (Left Side)(Outer) inside Physic Garden as highlighted ar
Protection layer of 4mm thick bituminous protection board of CHILDCARE foundation P6, P1A, P4 Zone 2
Steel Reinforcements for RING BEAM Zone 1F (INNER) Axis 01-1, 01P to 01S (as highlighted)
Shuttering and Scaffolding for RING BEAM Zone 1F (INNER) Axis 01-1, 01P to 01S (as highlighted)
Installation of Rock and Boulder No. RB-058 - 2nd layer (2 of 4)
Installation of Rock and Boulder No. RB-058 - 1st layer (1 of 4)
Excavation for Non-Potable Water Line from Point (E-647312.1368, N-2714142.4171) to Point (E-64737
Inspection for Laying of GreenTiles above the pipe for Fire & Security Distribution Line from G/FS/22 t
Inspection for Laying of Green Tiles above the pipe for Telecommunication Line from G/TL/09 to G/TL/0
Inspection and Compaction Test for backfilling sub-grade 2nd Layer (2 of 2) above the Sand cover for Fi
Inspection and Compaction Test for backfilling sub-grade 2nd Layer (2 of 2) above the Sand cover for P
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 1) above Red Tiles for MV Li
Inspection for Laying of Red Tiles above the pipe for MV Line from G/MV/01 to G/MV/25 at Zone-G as h
Inspection and Compaction Test of Backfilling Sub-grade 1st & 2nd Layer (2 of 3) for Foul Water Line
Inspection and Compaction Test of Backfilling Sub-grade 1st & 2nd Layer (2 of 3) for Foul Water Line
Inspection of Rough Grading (Backfilling) behind the boundary wall (External Side) upto Kicker Level a
Preliminary Inspection of Erected Steel in the Butterfly Garden From Axis 01 - 21
Preliminary Inspection of Erected Steel in Crescent 02 from Grid Line 02AL to 02AZ and 02D to 02F
' Pipe Installation of Foul Water Line for (200mmØ - UPVC- Class 4) from (FW-A-3 to FW-A-3-A). At C
'Bedding of Gravel 3/8" and Geotextile Surrounding Foul Water Line for (200mmØ - UPVC- Class 4) f
' Pipe Installation of Foul Water Line for (315mmØ - UPVC- Class 4) from (FW-A-3-6 to FW-A-3-3). At
'Bedding of Gravel 3/8" and Geotextile Surrounding Foul Water Line for (315mmØ - UPVC- Class 4) f
Notification to start Rough Grading upto (-75cm) from top of Asphalt in Road area and (-20cm) from FG
"Inspection of Formwork for the Concrete Pouring of SBC-04 - Wing Wall - (As Highlighted)"
Inspection of Formwork for the Footing of SBC-04 - Wing Wall - (As Highlighted)
Inspection and Compaction Test for 7th & 8th Layer (8 of 10) Backfilling under Boulder No. RB-141 (Stock
Inspection and Compaction Test for Backfilling Sub-grade 1st Layer (1 of 8) for Storm Water Line Fr
Inspection and Compaction Test for Backfilling Sub-grade 2nd Layer (2 of 8) for Storm Water Line Fr
Inspection And Compaction Test of Backfilling Sub-grade 10th Layer (10 of 13) For Foul Water Line F
Inspection And Compaction Test of Backfilling Sub-grade 10th Layer (10 of 13) For Foul Water Line F
Inspection And Compaction Test of Backfilling Sub-grade 10th Layer (10 of 13) For Foul Water Line F
Inspection And Compaction Test of Backfilling Sub-grade 10th Layer (10 of 13) For Foul Water Line Fr
Inspection And Compaction Test of Backfilling Sub-grade 9th Layer (9 of 10) For Foul Water Line From
Inspection And Compaction Test of Backfilling Sub-grade 7th Layer (7 of 8) For Foul Water Line From F
"INSPECTION FOR INSTALLATION OF SLABS FOR (FW-A-3-6.2, FW-A-3-6.10, FW-A-3-12 (As Highlighted).
INSPECTION FOR INSTALLATION OF SLABS FOR (FW1-3, FW9, FW12, FW12-1) - As Highlighted
INSPECTION FOR INSTALLATION OF SLABS FOR (MH-A-02, MH-A-08, MH-A-12) (As Highlighted).
Inspection for Blinding Concrete under Fire & Security Line Pit K/FS/26, K/FS/25, G/FS/20, G/FS/46, G/
Inspection for Blinding Concrete under Telecommunication Line Pit K/TL/27, K/TL/28, G/TL/17, G/TL/45
Inspection and Compaction Test for backfilling sub-grade 1st Layer (1 of 2) above the Sand cover for Fi
Inspection and Compaction Test for backfilling sub-grade 1st Layer (1 of 2) above the Sand cover for Po
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1of 1) beside Telecommunication L
Inspection and Compaction Test for backfilling sub-grade 1st Layer (1 of 2) above the Sand cover for
Inspection and Compaction Test for backfilling sub-grade 3rd Layer (3 of 4) above the Sand cover for F
Inspection of Reinforced Concrete Pouring for Duct Bank of Fire & Security line for C/RC-FS/5 at Zone
"Inspection of Formwork for Duct Bank of Fire & Security line for C/RC-FS/5 at Zone-C - As Highlight
"Inspection of Steel Reinforcement for Duct Bank of Fire & Security line for C/RC-FS/5 at Zone-C - As
Inspection of Reinforced Concrete Pouring for Duct Bank of Telecommunications line for C/RC-TL/1
Inspection of Formwork for Duct Bank of Telecommunications line for C/RC-TL/1 at Zone-C - As Highli
Inspection of Steel Reinforcement for Duct Bank of Telecommunications line for C/RC-TL/1 at Zone-C -
Inspection of backfilling Sub-grade above gravel 1st Layer (1 of 8) around Manhole MH-M-07, MH-M-0
Inspection of Sand bedding under pipe for MV Line from G/MV/25 TO G/MV/24 at Zone-G - as highlight
"INSPECTION OF INSTALLATION OF ALL SLABS FOR MH-D-01, MH-D-01-A1-01 (AS ATTACHED)."
"INSPECTION OF INSTALLATION OF SLAB FOR MH-E-01-1, MH-E-03, MH-F-01-3 (AS ATTACHED)"
Excavation for Foul Water Line from FW-A-3-6 to FW-A-3-3 & FW-A-3-1 to FW-A-3-A including Manhole
Level and Location for Infill Wall (kicker) at Zone 2N between BI 113-114-115 Between Gridlines 02-1 AQ
Steel Reinforcements for BUTTRESS BOI BOV BII BIV 39 Zone 1K (as hiighlighted)
Steel Reinforcements for Infill Wall (kicker) at Zone 2N between BI 113-114-115 Between Gridlines 02-1
Shuttering for Infill Wall (kicker) at Zone 2N between BI 113-114-115 Between Gridlines 02-1 AQ-AR-AS
Surface Preparation and Solvent Base Primer for Strip Footing Between PC 82-84, 79-81 Zone 1N (as Hig
Surface Preparation and Solvent Base Primer Under promenade Bridge Abutment Foundation Zone 1D Ax
Two layer of 4mm thick modified bituminous water proofing membrane Under promenade Bridge Abutm
Cementitious water proofing Under promenade Bridge Abutment Foundation Zone 1D Axis 01M (as High
Inspection and compaction test 5th layer for MCPE 3 Zone 2E 2F axis 02S-02R (as highlighted) (5th of 8
Inspection and compaction test 4th layer for MCPE 3 Zone 2E 2F axis 02S-02R (as highlighted) (4th of 8
Inspection and compaction test 4th layer for Strip footing and PC between PC 91-93 outer Axis: 02-2, 0
Inspection and compaction test 1st layer for Strip footing and PC between PC 91-93 outer Axis: 02-2, 0
Installation and Survey Report for Location and Levels of Anchor and Base Plate for Front Canopy @ BUT
Pre-Assembly Bolt Tightening Inspection of Crescent 02, Zone 6 2D & Zone 7 2B & 2C - Axis 02G to 02
Installation and Survey Report for Location and Levels of Anchor Bolts for RING BEAM Zone 2L (OUTER) A
Level and Location for Infill Wall at Zone 2R between Gridline 02-2AZ - 02-2BA (as highlighted)
Level and Location for BUTTRESS BOI 37 (with beam) Zone 1J
Level and Location for BUTTRESS BII 36-37 (with beam) Zone 1J
Level and Location for Strip Footing between PC 1-3-5 Zone 1A (as highlighted)
Level and Location for Tunnel 1 (side & mid) wall part-C (as Highlighted) Zone 2H
Level and Location for Infill Wall Between BII BIV 86-87 (INNER) as highlighted Zone 2G between Gridlin
Steel Reinforcements for BUTTRESS BOI BOV BII BIV 49 Zone 1M
Shuttering and Shear Connector (above) for Infill Wall at Zone 2R between Gridline 02-2AZ - 02-2BA (as
Concreting for Infill Wall at Zone 2R between Gridline 02-2AZ - 02-2BA (as highlighted)
Shuttering and Shear Connector for BUTTRESS BOV 37 Zone 1J
Concreting for BUTTRESS BOV 37 Zone 1J
Shuttering and Shear Connector for BUTTRESS BII 36-37 (with beam) Zone 1J
Concreting for BUTTRESS BII 36-37 (with beam) Zone 1J
Steel Reinforcements for Tunnel 1 (mid) wall part-C (as Highlighted) Zone 2H
Shuttering for Tunnel 1 (side & mid) wall part-C (as Highlighted) Zone 2H
Concreting for Tunnel 1 (side & mid) wall part-C (as Highlighted) Zone 2H
Shuttering for Infill Wall Between BII BIV 86-87 (INNER) as highlighted Zone 2G between Gridline 02-1V
Two Coat of bituminous damp proofing coating of CHILDCARE foundation P6, P1A, P4 Zone 2N (as highli
Steel Reinforcements for Strip Footing between PC 1-3-5 Zone 1A (as highlighted)
Shuttering for Strip Footing between PC 2-4-6-8 Zone 1A (as highlighted)
Shuttering for Strip Footing between PC 1-3-5 Zone 1A (as highlighted)
Concreting for Strip Footing between PC 1-3-5 Zone 1A (as highlighted)
Single layer of 4mm thick modified bituminous waterproofing membrane under Strip Footing Between P
Surface Preparation and Solvent Base Primer Application under Strip Footing Between PC 143-145 Zone
Concreting for Infill Wall between BII BIV 27 - 28 Gridline 01-1V - 01-1U ZONE 1G
Concreting for MCPE 4 Wall at axis 01AP Zone 1N (as highlighted) (886.25)
Concreting of CHILDCARE foundation P2 & P3 Zone 2N (as highlighted)
Concreting for CHILDCARE foundation P1, P1A, P5 Zone 2N (as highlighted)
Concreting of Mass Concrete, Blinding of CHILDCARE foundation Zone 2N (as highlighted)
Concreting of CHILDCARE foundation P6, raft, P1A, P4 Zone 2N (as highlighted)
Concreting for RING BEAM Zone 2L (INNER) Axis 02-1, 02AL to 02AH (as highlighted)
"Inspection of Grouting (Horizontal Joints) for Rock Boulder - RB-138 for All Layers"
"Inspection of Grouting (Vertical Joints) for Rock Boulder - RB-138 for All Layers"
Excavation for Foul Water Line from FW-A-3 to near FW-A-2 prior to start Gravel Bedding (as Highlighte
Inspection and Compaction Test for backfilling Sub-grade 4th Layer (4 of 4) behind the boundary wall (
Inspection and Compaction Test for 5th & 6th Layer (6 of 10) Backfilling under Boulder No. RB-141 (Stock
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 1) above GreenTiles for Fire &
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 1) above Green Tiles for Tel
Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 3) above Red Tiles for MV L
Inspection of Steel Reinforcement (Horizontal) for the Wing Walls of SBC-02 - (As Highlighted)
Inspection of Alignment for the Installed Baseplates in Crescent 01 Zone 5, 1B Outer
Inspection of Alignment for the Installed Baseplates in Crescent 01 Zone 4, 1C Outer
Inspection of Alignment for the Installed Baseplates in Crescent 01 Zone 4, 1D Outer
Pipe Installation of Sub-Surface Drainage (Main Line & Branches) Pipes; (110mmØ, UPVC-CLASS-4)
Inspection of Sand Covering Layer for Protection of Fire & Security Line from (B/FS/31 to G/FS/02) at
Inspection of Sand Covering Layer for Protection of Telecommunications Line from (B/TL/32 to G/TL/03
Excavation for Foul Water Line from FW-A-3 to FW-A-4 including Manhole FW-A-4 prior to start Gravel
Inspection of backfilling Gravel for the Duct Bank of MV Line from F/MV/04 to G/MV/01 at Zone- F&G (
Inspection for Blinding Concrete under Fire & Security Line Pit K/FS/02, K/FS/24, K/FS/17, K/FS/13, K/FS
Inspection for Blinding Concrete under Telecommunication Line Pit K/TL/02, K/TL/26, K/TL/04, K/TL/21,
Inspection and Compaction Test for backfilling sub-grade 3rd Layer (3 of 3) above the Sand cover for P
Inspection and Compaction Test for backfilling sub-grade 4th Layer (4 of 4) above the Sand cover for Fi
"Inspection and Compaction Test for NGL of Foul Water Line from FW-A-3 to FW-A-3-1 at Zone-6 as hig
Inspection And Compaction Test of Backfilling Sub-grade 9th Layer (9 of 10) For Foul Water Line From
Inspection And Compaction Test of Backfilling Sub-grade 8th Layer (8 of 9) For Foul Water Line From
Inspection of Steel Reinforcement for the Footing and Walls of SBC-04 - Wing Wall - (As Highlighted)
Inspection and Compaction Test for 3rd & 4th Layer (4 of 10) Backfilling under Boulder No. RB-141 (Stock
Inspection and compaction test 10th layer for MCPE 2 Zone 2H 2J 2K axis ( AH - AB ) (as highlighted) (
Inspection and compaction test 3rd layer for MCPE 3 Zone 2E 2F axis 02S-02R (as highlighted) (3rd of 8t
Inspection and compaction test 1st layer for Internal Building for Zone 1N (as highlighted) (1st of 6th)
Inspection of Steel Reinforcement for the Footing and Wing Walls of SBC-09 - (As Highlighted)
Inspection and compaction test 2nd layer for MCPE 3 Zone 2E 2F axis 02S-02R (as highlighted) (2nd of 8
Inspection and compaction test 9th layer for MCPE 2 Zone 2H 2J 2K axis ( AH - AB ) (as highlighted) (9t
Level and Location for Blinding of Retaining Wall of Zone 1D axis 01J to 01G (as highlighted)
Level and Location for Excavation of Retaining Wall of Zone 1D axis 01J to 01G (as highlighted)
Level and Location for RING BEAM Zone 2L (OUTER) Axis 02-2, 02AL to 02AH (as highlighted)
Grouting of Installed Anchor bolt and under Baseplate at Zone 1C inner ring beam (as highlighted) u
Grouting of Installed Anchor bolt and under Baseplate at Zone 1D inner ring beam (as highlighted) u
Grouting of Installed Anchor bolt and under Baseplate at Zone 1C inner ring beam (as highlighted) us
Grouting of Installed Anchor bolt and under Baseplate at Zone 1D inner ring beam (as highlighted) us
Shuttering for Blinding of Retaining Wall of Zone 1D axis 01J to 01G (as highlighted)
Concreting for Blinding of Retaining Wall of Zone 1D axis 01J to 01G (as highlighted)
Shuttering and Scaffolding for RING BEAM Zone 2L (OUTER) Axis 02-1, 02AL to 02AH (as highlighted)
Steel Reinforcements for RETAINING WALL (WALL) Axis 01M to 01J (as highlighted) Zone 1D
Grouting of Installed Anchor bolt and under Baseplate at Zone 1E inner ring beam (as highlighted) us
Grouting of Installed Anchor bolt and under Baseplate at Zone 1B inner ring beam (as highlighted) us
Grouting of Installed Anchor bolt and under Baseplate at Zone 1E inner ring beam (as highlighted) u
Grouting of Installed Anchor bolt and under Baseplate at Zone 1B inner ring beam (as highlighted) u
2nd Coat Damp proofing for Footings of Canopy Foundations (16 no's) at Grid (A & B/1-8) and New Tic
1st Coat Damp proofing for Footings of Canopy Foundations (16 no's) at Grid (A & B/1-8) and New Tick
Primer Coating Prior to Damp proofing for Footings of Canopy Foundations (16 no's) at Grid (A & B/1-
Surface preparation prior to Backfilling Surround conopy footings (4 nos ) at grid (A & B / 1 & 2 ) and
Gravel Backfilling (50 cm height) Surround the Manhole (MH-C-4-2) Inside water Garden, at highlight
Surface preparation prior to Backfilling Surround the Manhole (MH-C-4-2) Inside water Garden, at hi
Aluminium flashing and Sealant on water proofing for Foundation of Boundary wall (Outer Face) @ Gri
Slated Layer 4mm thk.modified Bitumenous membrane on water proofing for Foundation of Boundary w
Protection Layer 4mm thk. Bitumenous Protection board on water proofing for Foundation of Boundary
Inspection & Compaction tests of 4th Layer Backfilling (Sub-Grade) (Out of 6 layers) Surround the Foot
Concrete pouring and Shuttering for Kicker of Plant Room at Physic Garden, at highlighted area in
Excavation and Bed preparation for water feature lines (90mm and 110mm HDPE ) from center to outer
Surface Preparation Prior to Water proofing on Foundation and Wall (inner side) at grid (2-20/A&B),
HDPE Pipe Installation of Water Features pipes; (110mmØ SDR11-PE100); As per High lighted Attac
' Pipe Installation of Foul Water Line for (110mmØ - UPVC- Class 4) from (FW-A-3-9 to Child Care Bui
'Bedding of Gravel 3/8" and Geotextile Surrounding Foul Water Line for (110mmØ - UPVC- Class 4) fro
Inspection and Compaction Test for Backfilling Sub-grade 1st Layer (1 of 8) for Storm Water Line Fr
Inspection And Compaction Test of Backfilling Sub-grade 9th Layer (9 of 10) For Foul Water Line From
Inspection And Compaction Test of Backfilling Sub-grade 9th Layer (9 of 10) For Foul Water Line From
Inspection And Compaction Test of Backfilling Sub-grade 9th Layer (9 of 10) For Foul Water Line From
Inspection And Compaction Test of Backfilling Sub-grade 6th Layer (6 of 8) For Foul Water Line From F
Inspection and Compaction Test for backfiling Sub-grade 1st Layer (1 of 1) above Red Tiles for MV Lin
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 3) above Red Tiles for MV L
Inspection for Blinding Concrete under Fire & Security Line Pit K/FS/20, K/FS/19, K/FS/08, K/FS/07, K/FS
Inspection for Blinding Concrete under Telecommunication Line Pit K/TL/14, K/TL/25, K/TL/11, K/TL/22,
Inspection and Compaction Test for backfilling sub-grade 2nd Layer (2 of 3) above the Sand cover for
Inspection and Compaction Test for backfilling sub-grade 2nd Layer (2 of 4) above the Sand cover for
Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 4) behind the boundary wall (
Inspection and Compaction Test for 1st & 2nd Layer (2 of 10) Backfilling under Boulder No. RB-141 (Stock
Inspection of Sand Covering Layer for Protection of Fire & Security Distribution Line from (G/FS/44 to
Inspection of Sand Covering Layer for Protection of Telecommunications Line from (G/TL/27 to G/TL/39)
Inspection of Concrete Pouing for the Upstand of SBC-05 (As Highlighted)
Inspection of Formwork for the Upstand of SBC-05 (As Highlighted)
Inspection of Steel Reinforcement for the Upstand of SBC-05 (As Highlighted)
Inspection of Concrete Pouring for the Footing of SBC-03 - Wing Wall - (As Highlighted)
Inspection of Formwork for the Footing of SBC-03 - Wing Wall - (As Highlighted)
Inspection of Steel Reinforcement for the Footing and Walls of SBC-03 - Wing Wall - (As Highlighted)
"Inspection and Compaction Test for Backfilling Sub-base under Boulder No. RB-058 (Rock Area) Stock P
Soil Preparation under Boulder No. RB- 058
"Inspection Of Backfilling Gravel (1st And 2nd Layer Out Of 2) For Manhole MH-M-07, MH-M-08, MH-
Soil Preparation under Boulder No. RB- 141
Installation of straight conduit 75mm PVC Conduit & Junction Box for Low Current System at Ticket B
Inspection and compaction test 8th layer for MCPE 2 Zone 2H 2J 2K axis ( AH - AB ) (as highlighted) (8t
Inspection and compaction test 1st layer for MCPE 3 Zone 2E 2F axis 02S-02R (as highlighted) (1st of 8t
Installation and Survey Report for Location and Levels of Anchor and Base Plate for Front Canopy @ BUT
Installation and Survey Report for Location and Levels of Anchor and Base Plate for Front Canopy @ BU
Surface Preparation Prior to start Continue Backfilling at Internal Building Zone 1N (as highlighted)
Level and Location for Blinding of Strip Footing Between PC 143 - 145 Zone 2H (as highlighted)
Level and Location for BUTTRESS BII 34, 35 (with beam) Zone 1J 1H
Level and Location for BUTTRESS BIV BOV 50-51 Zone 1N 1M
Level and Location for BUTTRESS BII 33 (with Beam) Zone 1H
Level and Location for Strip Footing between PC 79-81, 82-84 Zone 1N (as highlighted)
Weld Visual & NDT Inspection for Crescent 02, Zone 7 2B & 2C- Axis 02D to 02AI (as per attached high
Concreting for BUTTRESS BIV BOV 50-51 Zone 1N 1M
Steel Reinforcements for BUTTRESS BOI 50-51 Zone 1N 1M
Anti Termite application under Blinding of Strip Footing Between PC 143 - 145 Zone 2H (as highlighted)
Shuttering for Blinding of Strip Footing Between PC 143 - 145 Zone 2H (as highlighted)
Survey for MCPE 4 Wall at axis 01AP Zone 1N (as highlighted) (886.25)
Shuttering for MCPE 4 Wall at axis 01AP Zone 1N (as highlighted) (886.25)
Shuttering and Shear Connector for BUTTRESS BII 34, 35 Zone 1J 1H
Concreting for BUTTRESS BII 34, 35 (with beam) Zone 1J 1H
Shuttering and Shear Connector for BUTTRESS BIV BOV 50-51 Zone 1N 1M
Shuttering and Shear Connector for BUTTRESS BII 33 (with Beam) Zone 1H
Concreting for BUTTRESS BII 33 (with Beam) Zone 1H
Stack Boulders Installed Layers at levels +872.40, +876.00 & 876.50, along Open Channel (Boat & Geys
Steel Reinforcements for Strip Footing between PC 79-81, 82-84 Zone 1N (as highlighted)
Shuttering for Strip Footing between PC 79-81, 82-84 Zone 1N (as highlighted)
Concreting for Strip Footing between PC 79-81, 82-84 Zone 1N (as highlighted)
Inspection of alignment for the Installed Baseplate in Crescent 01 Zone 4, 1D & 1C inner
Stack Boulders Installed layers at Levels +881.00, & 881.50 (Part 4) Between Water Play Garden & Bo
Pre Assembly bolt tightening inspection of Crescent 02, Zone 3 - 2M & zone 7 2B Axis 02AL, 02D, 02E
Inspection of alignment for installated baseplate in crescent 1 Zone 3, 1E
Stack Boulders Installed layer upto Level +877.50, 878.00, 878.50, 879.00 & 897.50, Between Water P
Surface Preparation Prior to start Blinding concreting at Cafeteria foundation at Zone 2A (as highlighted
Inspection and compaction test 7th layer for MCPE 2 Zone 2H 2J 2K axis ( AH - AB ) (as highlighted) (7t
Inspection and compaction test 3rd layer for backfilling (red sand) for MCPE3 from axis (02 R to 02 S) zo
Inspection and compaction test 2nd layer for backfilling inside cafeteria building axis ( 02D to 02A ) zon
Inspection and compaction test 4th layer for backfilling inside cafeteria building zone 2A (as highlighte
Inspection and compaction test 2nd layer for Backfilling ( 3m external ) around LARGE MOSQUE (as H
Inspection and compaction test final layer for backfilling under slab on grade blinding of LARGE MOSQ
Coordinates and Levels for Walls & Columns on Internal foundations, Inside Butterfly Garden, at hig
Inspection and compaction test 1st layer for Backfilling ( 3m external ) around LARGE MOSQUE (as Hi
Level and Location for Blinding of Cafeteria foundation Zone 2A (as highlighted)
1st layer Gravel Backfilling Surround the Manhole (MH-D-01-A1-02-01) Inside Maze garden, as per hig
Level and Location for Excavation for Promenade Bridge Abutment at Grid M(as highlighted)
Inspection & Compaction tests of 4th Layer Backfilling (Sub-Grade) (Out of 6 layers) along the Bound
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 3 layers) along the Bound
Level and Location for Promenade Bridge Abutment Blinding under foundation at Grid M (as highlighted
Inspection & Compaction tests of 4th Layer Backfilling (Sub-Grade) (Out of 5 layers), along the Boundary
Level and Location for Promenade Bridge Abutment Foundation (to Wadi between gridlines 01M - 01P) (
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 3 layers) Surround the Man
Concreting for Blinding of Cafeteria foundation Zone 2A (as highlighted)
Shuttering for Promenade Bridge Abutment Blinding under foundation at Grid M (as highlighted)
Inspection and compaction test 2nd layer of subgrade (out of 5 layers ) for Backfilling Surround the
Anti Termite application under Blinding of Cafeteria foundation Zone 2A (as highlighted)
Shuttering for Blinding of Cafeteria foundation Zone 2A (as highlighted)
Steel Reinforcements for Infill Wall Kicker Between BII BIV 88-89 (INNER) as highlighted Zone 2G betwe
Concreting for Ground Beam between PC 80-82 Zone 1N (as highlighted)
Steel Reinforcements for Infill wall BO 123-124 (as highlighted) Zone 2Q outer between Gridline 02-2AY
Concreting for Infill Wall between Gridline 01-1/T - 01-1/U Zone 1G (as highlighted)
Concreting for Infill Wall between Gridline 01-1T - 01-1U - 01-S Zone 1G (as highlighted)
"Inspection of Grouting (Horizontal Joints) for Rock Boulder - RB-316 for All Layers"
"Inspection of Grouting (Horizontal Joints) for Rock Boulder - RB-315 for All Layers"
"Inspection of Grouting (Horizontal Joints) for Rock Boulder - RB-115a for All Layers"
"Inspection of Grouting (Vertical Joints) for Rock Boulder - RB-115a for All Layers"
Inspection of Rough Grading (upto bottom of Finishing and Cutting Flower Boxes) in Wadi-1 & Wadi-2
Inspection of Backfilling Sub-grade above gravel 4th Layer (4 of 8) around Manhole for MH-M-14 - as Hig
Inspection of Backfilling Sub-grade above gravel 3rd Layer (3 of 8) around Manhole for MH-M-14 - as Hig
Inspection for Laying of GreenTiles above the pipe for Fire & Security Distribution Line from G/FS/12 t
Inspection for Laying of Green Tiles above the pipe for Telecommunication Line from G/TL/14 to G/TL/2
Inspection of Concrete Pouring for the Wing Wall of SBC-09 (As Highlighted)
Inspection of Formwork for the Wing Wall of SBC-09 (As Highlighted)
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 1) above Green Tiles for Fire
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 1) above Green Tiles for Tele
Inspection and Compaction Test for backfilling sub-grade 2nd Layer (2 of 3) above the Sand cover for P
Inspection and Compaction Test for backfilling sub-grade 3rd Layer (3 of 4) above the Sand cover for Fi
Surface Preparation prior to start backfilling Gravel for the Duct Bank of MV Line from F/MV/04 to G/
Inspection of Water proofing for the Duct Bank of MV Line from F/MV/04 to G/MV/01 at Zone- F&G (As
Surface Preparation prior to start water proofing for the Duct Bank of MV Line from F/MV/04 to G/MV/
Inspection of Concrete (Plain) Pouring for Duct Bank of Fire & Security line between B/RC-FS/8 and C/F
Inspection of Concrete (Plain) Pouring for Duct Bank of Telecommunications line between B/RC-TL/11
Inspection of Reinforced Concrete Pouring for Duct Bank of Telecommunications line for B/RC-TL/08, B
Installation of straight UPVC Conduit (2x110mm) for Low Current (Fire & Security) Ductbank no.
Installation of straight UPVC Conduit (4x110mm) for Low Current (Telecommunication) Ductbank no
Concrete pouring for blinding under Electrical Handholes of Low Voltage (MH/SG/LV/01-06), Emerg
Sand Cover & Pipes Protection for Water Feature Lines (Part 1 - HDPE 300mm Main line & 3 Sub lin
Concrete pouring for blinding under Electrical Handholes of Emergency (MH/ZG/EM/07 & 08), (MH/ZG
Excavation & Blinding Levels for Electrical Handholes of Emergency (MH/ZG/EM/07 & 08), (MH/ZG/LV
Coordinates and levels for Kicker of Plant Room at Physic Garden, at highlighted area in attached d
Coordinates and levels for Footings of Seat Walls (Left Side) (Outer), Inside Physic garden, as highlig
Inspection and compaction tests for 6th layer of Backfill (out of 8 layers ) (sub grade ) along the Bou
Single Layer 4mm thk. Modified Bitumenous Membrane water proofing for Foundation of Boundary wall
Steel Reinforcement for Footing & Kicker of Plant Room at Physic Garden, at highlighted area in at
Steel Reinforcement for Footings of Seat Walls (Left Side) (Outer), Inside Physic garden, as highlighte
Steel Reinforcements for Promenade Bridge Abutment Foundation (to Wadi between gridlines 01M - 01P
Shuttering for Promenade Bridge Abutment Foundation (to Wadi between gridlines 01M - 01P) (as highl
Concreting for Promenade Bridge Abutment Foundation (to Wadi between gridlines 01M - 01P) (as highl
We request your attendance to inspect the following works : Check The Lower Part of Column - QTY
Tent Mock up for Tickketing
"Inspection of Steel Reinforcement for Duct Bank of Fire & Security line for B/RC-FS/6, B/RC-FS/7 at Zo
Inspection of Reinforced Concrete Pouring for Duct Bank of Fire & Security line for B/RC-FS/6, B/RC-FS/
"Inspection of Formwork for Duct Bank of Fire & Security line for B/RC-FS/6, B/RC-FS/7 at Zone-B - As H
Inspection of Formwork for Duct Bank of Telecommunications line for B/RC-TL/08, B/RC-TL/31, B/RC-TL/
"Inspection of Steel Reinforcement for Duct Bank of Telecommunications line for B/RC-TL/08, B/RC-TL/
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 1) above Red Tiles for MV L
Inspection and Compaction Test for backfilling 1st Layer (1 of 1) above Green Tiles for Fire & Security
"Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1of 1) above Green Tiles for Tele
Inspection and Compaction Test for backfilling sub-grade 1st Layer (1 of 3) above the Sand cover for
Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 4) behind the boundary wall (
Inspection of Backfilling Sub-grade above gravel 2nd Layer (2 of 8) around Manhole for MH-M-14 - as Hi
Inspection of Backfilling Sub-grade above gravel 1st Layer (1 of 8) around Manhole for MH-M-14 - as Hig
Inspection of Backfilling Gravel 2nd Layer (2 of 2) around Manhole for MH-M-14 - as Highlighted
Inspection of Backfilling Gravel 1st Layer (1 of 2) around Manhole for MH-M-14 - as Highlighted
"Inspection of Concrete Pouring for the Footing of SBC-02 - Wing Wall - (As Highlighted)"
Inspection of Formwork for the Footing of SBC-02 - Wing Wall - (As Highlighted)
Installation of straight UPVC Conduit (Dia.75mm) Low Voltage Ductbank (from MH/WG/FLV/10 to Pull
"Inspection and Compaction Test for backfilling sub-grade 7th & 8th Layer (8 of 8) around SBC-06-Expan
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 4) behind the boundary wall (
Installation of straight UPVC Conduit (Dia.25mm) and Box for Fire Alarm (Speaker) at the Infill Wall A
Installation PVC Conduit & Box for Voice and Data (DATA,CAM & Telephone) at Ticket Booth # 7-A Gro
Installation PVC Conduit & Box for Security System (CAM, Door Release Push Button, Door Controller,
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 3 layers) along the Bound
Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Grade) (Out of 6 layers) along the Bound
Installation of UPVC Conduit (Dia. 25mm) and Box for Fire Alarm System (Break Glass) at the New Tick
Stack Boulders Installed Layers at levels +874.40, +874.80, 875.20 & +875.60, along Open Channel (Ge
Solvent Base Primer Coating prior to Membrane water proofing for Foundation of Boundary wall (Outer
Surface Preparation Prior to Backfilling Surround the Manhole (MH-D-01-A1-02-01) Inside Maze garde
Steel Reinforcement for Walls of Boundary wall Span 50B, 51 & 52, As per Attached Highlighted Drawi
Steel Reinforcement for Walls of Boundary wall Span 53, 54 & 55, As per Attached Highlighted Drawin
Inspection of 1st layer Gravel Backfilling Surround the Manhole (MH-D-05-01-02), Inside Physic garden,
Inspection and compaction test 1th layer of subgrade (out of 5 layers ) for Backfilling Surround the
Excavation & Blinding Levels of Electrical Handholes of Low Voltage (MH/SG/LV/01-06), Emergency
Coordinates & Levels for Blinding under Seat Walls (A & C) and along Whispering Cave-1, Inside Sound
Excavation & Surface Preparation for Seat Walls (A & C) and along Whispering Cave-1, Inside Sound &
Excavation & Bed Preparation for Sub surface Drainage pipes (110mm Pipes) along the Boundary wall (I
Stack Boulders Installed layers at Levels +879.00, 879.50, 880.00, 881.00, 880.50, 881.50, 882.00 &
Stack Boulders Installed Layers at levels +873.60 & +874.00, along Open Channel (Geyser garden Side)
'Potable Water pipes Sand Cover & Pipes Protection (30 cm above Pipes). As per highlighted Area in
'Warning Tape Installation of storm Water Line for (450mmØ - UPVC- Class 4) from (MH-M-11) to(MH
' 300 mm Gravel 3/8" Backfilling and Geotextile of storm Water Line for (450mmØ - UPVC- Class 4)
Surface Preparation Prior to Start Backfilling Gravel For Manhole MH-M-07, MH-M-08, MH-M-09, MH-M-
Inspection for casting concrete for short piece and Surface Preperation prior to start waterproofing
Inspection of Sand Bedding under pipe for Non-Potable Water Line from NPW-ISC-01 to NPW-ISC-03 inc
Excavation for Non-Potable Water Line from NPW-ISC-01 to NPW-ISC-03 including Pit NPW-ISC-01, NPW
Inspection and Compaction Test for backfilling sub-grade 1st Layer (1 of 3) above the Sand cover for P
Inspection and Compaction Test for backfilling sub-grade 2nd Layer (2 of 4) above the Sand cover for Fi
Inspection for Blinding Concrete under Fire & Security Line Pit F/FS/17, F/FS/11, F/FS/03, F/FS/04, F/
Inspection for Blinding Concrete under Telecommunication Line Pit F/TL/15, F/TL/12, F/TL/14, F/TL/03
Excavation for Foul Water Line from FW-A-3-6 to FW-A-3-3 & FW-A-3-1 to FW-A-3-A including Manhole
Pre-Assembly Bolt Tightening Inspection of Aviary Garden from Grid Line 09 to 15
Steel Reinforcement for Walls & Columns on Internal foundations, Inside Butterfly Garden, at highl
Concrete Pouring & Shuttering for Starter (Kicker) for Wall of New Ticketing Booth # 4A, at highlighte
Coordinates & Levels of Starter (Kicker) for Wall of New Ticketing Booth # 4A, at highlighted area in
Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Grade) (Out of 6 layers) Surround the Foot
Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Grade) (Out of 5 layers), along the Boundary
Surface Preparation Prior to start Backfilling Beside PC and stripfooting outer between PC 91-93 (as Hig
Level and Location for RETAINING WALL FOUNDATION Axis 01J to 01K (as highlighted) Zone 1D
Level and Location for Infill Wall between Gridline 02-1X - 02-1Y Zone 2G (as highlighted)
Level and Location for BUTTRESS BOI 36, 37 (with beam) Zone 1J
Shuttering and Shear Connector for BUTTRESS BOI 36, 37 Zone 1J
Concreting for BUTTRESS BOI 36, 37 (with beam) Zone 1J
Concreting for RETAINING WALL FOUNDATION Axis 01J to 01K (as highlighted) Zone 1D
Shuttering for RETAINING WALL FOUNDATION Axis 01J to 01K (as highlighted) Zone 1D
Steel Reinforcements for RETAINING WALL FOUNDATION Axis 01J to 01K (as highlighted) Zone 1D
Level and Location for Mass Concrete, Blinding of CHILDCARE foundation Zone 2N (as highlighted)
Inspection and compaction test 2nd layer for backfilling (red sand) for MCPE3 from axis (02 R to 02 S) z
Level and Location for Infill Wall between BII BIV 26 - 27 Gridline 01-1V - 01-1U ZONE 1G
Survey for MCPE 4 Foundation at axis 01AP ( second part ) Zone 1N (as highlighted)
'Fire Fighting pipes Sand Cover & Pipes Protection (30 cm above Pipes). As per highlighted Area in th
Installation of UPVC Conduit (Dia. 32mm) & Boxes for Power (Thermostat & Fused Switch for AC & Car
Stack Boulders Installed Layer at level +876.50, +877.00 & +877.45, along Open Channel (Geyser garde
Installation of UPVC Conduit (Dia. 32mm) & Boxes for Power (Socket Outlet) at the New Ticket Booth
Stack Boulders Installed layers at Levels +876.65, 877.05, 877.50, 878.00 & 878.50, along Boundary w
Stack Boulders Installed layers at Levels +877.05 & 877.50, along Boundary wall (at span 22-23) from
Excavation & Bed Preparation for Irrigation Sub-main Line Distribution network (Part 2) (110mm Lin
Sand Bedding for Water Feature Line (Part 3) (HDPE 250mm & 110mm Lines) Inside Water play garden,
Surface preparation prior to Backfilling Surround the Manholes (1 no's) (MH-D-05-01-02), Inside Physi
Surface preparation prior to Backfillling along the Boundary Wall (Inner side) @ Grid (EXC1-04 to EXC
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 6 layers) along the Bound
Installation of UPVC Conduit (Dia. 32mm) & Boxes for Power (Fused Connection) at the New Ticket Bo
Surface Preparation and 50 x 50 % Base primer coating of CHILDCARE foundation P6, P1A, P4 Zone 2N (a
Steel Reinforcements for MCPE 3 Slab inner at axis 03-1 to 03-2, 02S Zone 2E 2F (as highlighted)
Concreting for MCPE 3 Slab inner at axis 03-1 to 03-2, 02S Zone 2E 2F (as highlighted)
Steel Reinforcements for MCPE 4 Foundation at axis 01AP ( second part ) Zone 1N (as highlighted)
Surface Preparation Prior to Start Backfilling Gravel For Manhole MH-M-14 - as Highlighted
Shuttering for MCPE 4 Foundation at axis 01AP ( second part ) Zone 1N (as highlighted)
"Surface Preperation prior to start backfilling behind the boundary wall (External Side) upto Kicker Le
Protection layer of 4mm thick bituminous protection board for foundation (outer side) large mosque
Inspection of Sand Covering Layer for Protection of Fire & Security Line from (K/FS/13 to K/FS/12) at Z
Inspection of Sand Covering Layer for Protection of Telecommunications Line from (K/TL/21 to K/TL/06)
Inspection of Sand Covering Layer for Protection of Fire & Security Line from (K/FS/03 to K/FS/22) at Z
Concreting for MCPE 4 Foundation at axis 01AP ( second part ) Zone 1N (as highlighted)
Inspection of Sand Covering Layer for Protection of Telecommunications Line from (K/TL/03 to K/TL/12)
Inspection of Sand Covering Layer for Protection of Fire & Security Line from (G/FS/12 to G/FS/37) at Z
Surface Preparation and Base primer coating for Wall (outer side) large mosque (as Highlighted)
Inspection of Sand Covering Layer for Protection of Telecommunications Line from (G/TL/14 to G/TL/23
Inspection of Sand Covering Layer for Protection of Fire & Security Line from (G/FS/47 to G/FS/05) at Z
Inspection of Sand Covering Layer for Protection of Telecommunications Line from (G/TL/52 to G/TL/07
Two coat of bituminous waterproofing coating for Wall (outer side) large mosque (as Highlighted)
"Inspection and Compaction Test for backfilling sub-grade 5th & 6th Layer (6 of 8) around SBC-06-Expan
Inspection and Compaction Test for backfilling sub-grade 1st Layer (1 of 4) above the Sand cover for F
Inspection and Compaction Test for backfilling 1st Layer (1 of 1) to cover the GreenTiles above the pi
Protection layer of 4mm thick bituminous protection board for Wall (outer side) large mosque (as Hig
Inspection and Compaction Test for backfilling 1st Layer (1 of 1) to cover the GreenTiles above the p
Inspection for Laying of GreenTiles above the pipe for Fire & Security Distribution Line from G/FS/44 t
Inspection for Laying of Green Tiles above the pipe for Telecommunication Line from G/TL/27 to G/TL/4
Inspection for Laying of GreenTiles above the pipe for Fire & Security Distribution Line from G/FS/05 t
Inspection for Laying of Green Tiles above the pipe for Telecommunication Line from G/TL/07 to G/TL/3
Inspection for Laying of Red Tiles above the pipe for MV Line from G/MV/14 to G/MV/27 at Zone-G as h
Inspection and Compaction Test for backfilling sub-grade 1st Layer (1 of 4) above the Sand cover for P
"Inspection of Backfilling Sub-grade 3rd Layer (3 of 3) around Gullies including branch for G-H-21, G
Inspection and Compaction Test for backfilling 1st Layer (1 of 1) to cover the GreenTiles above the pip
Inspection and Compaction Test for backfilling 1st Layer (1 of 1) to cover the GreenTiles beside & ab
Two layers of 4mm thick modified bituminous waterproofing coating for MCPE 4 undr Foundation at Zo
Installation of straight UPVC Conduit (4x110mm) for Low Current (TELECOM) Ductbank no.CB/D-TL/0
Installation of straight UPVC Conduit (2x110mm) for Low Current (Fire and Security) Ductbank no.B
Inspection of Casting the Blinding Under MV Pulling Box Type-01 number: G/MV/ 07, G/MV/ 08, G/MV
"Inspection And Compaction Test of Backfilling Sub Grade Above Gravel 2nd Layer (2 of 8) around Ma
Inspection of Backfilling Sub-grade 9th Layer (9 of 11) For Foul Water Line From FW-A-13-4 to SBC inc
Inspection of Backfilling Sub-grade 8th Layer (8 of 11) For Foul Water Line From FW-A-13-4 to SBC inc
Inspection of Concrete Pouring for the Wing Wall of SBC-05 (As Highlighted)
Inspection of Formwork for the Wing Wall of SBC-05 (As Highlighted)
Inspection and Compaction Test for backfilling sub-grade 1st Layer (1 of 4) above the Sand cover for Fi
"Inspection for Blinding Concrete under Footing of Storm Box Culvert - SBC-04 - Wing Wall (As Highligh
Inspection and Compaction Test for backfilling sub-grade 2nd Layer (2 of 3) above the Sand cover for P
Inspection and Compaction Test for backfilling sub-grade 2nd Layer (2 of 3) above the Sand cover for P
Inspection and Compaction Test for backfilling sub-grade 2nd Layer (2 of 5) above the Sand cover for F
Inspection and Compaction Test for backfilling sub-grade 3rd Layer (3 of 4) above the Sand cover for Fi
"Inspection and Compaction Test for backfilling sub-grade 3rd & 4th Layer (4 of 8) around SBC-06-Expan
"Inspection for the Excavation and Soil Preparation of Storm Box Culvert - SBC-04 - Wing Wall (As Highl
Inspection of Sand Covering Layer for Protection of MV Line from (G/MV/12 to G/MV/13) at Zone-G as h
'Warning Tape Installation of Fire Fighting Networks for (160 & 250mmØ-UPVC-Class-5). As per highl
'Warning Tape Installation of Potable Water Networks for (50 & 200mmØ-UPVC-Class-5). As per highl
'Potable Water pipes Sand Cover & Pipes Protection (30 cm above Pipes). As per highlighted Area in
Grouting for Stone Cladding of Boundary wall (Inner Side) Span 49A, 49B & 50A and Column's C49A, C
Inspection of Installation and Alignment for the Crescent 02 Zone 2 - 2P
Weld Visual & NDT Inspection for Crescent 02, Zone 3 2M- Axis 02AO to 02AL
Grouting for Stone Cladding of Boundary wall (Inner Side) Span 47 & 48 and Column's C47 & C48A (All
surface preparation prior to start backfilling inside cafeteria building axis (02D to 02A ) zone 2A (as high
Surface Preparation Prior to start Backfilling ( 3m external ) around LARGE MOSQUE (as Highlighted)
Grouting for Stone Cladding of Boundary wall (Inner Side) Span 45 & 46 and Column's C45 & C46 (All S
Inspection and compaction test 3rd layer for backfilling inside cafeteria building zone 2A (as highlighte
Inspection and compaction test 1st layer for backfilling inside cafeteria building axis ( 02D to 02A ) zone
Surface preparation prior to water proofing for Foundation of Boundary wall (Outer Face) @ Grid (1-23
Inspection and compaction test 1st layer for backfilling (red sand) for MCPE3 from axis (02 R to 02 S) zo
Pre-Assembly Bolt Tightening Inspection for the Aviary Garden from Grid Line 14 to 21.
Grouting for Stone Cladding of Boundary walls (Outer Side) Span 39, 40 & 41, As per Attached Highli
Pre-Assembly Bolt Tightening Inspection for the Aviary Garden from GL 16 – 23.
Excavation & Soil Preparation for Open Channel (Part 2) at Wadi # 3, Inside Water Garden, At Highlig
Level and Location for BUTTRESS BIV 36, 37 Zone 1J
Level and Location for BUTTRESS BOI 33, 34, 35 (with beam) Zone 1J 1H
Level and Location for CHILDCARE foundation P2 & P3 Zone 2N (as highlighted)
Shuttering and Shear Connector for BUTTRESS BOI 33, 34, 35 Zone 1J 1H
Concreting for BUTTRESS BOI 33, 34, 35 (with beam) Zone 1J 1H
Steel Reinforcements CHILDCARE foundation P2 & P3 Zone 2N (as highlighted)
Shuttering of CHILDCARE foundation P2 & P3 Zone 2N (as highlighted)
Steel Reinforcements for Infill Wall between Gridline 02-1/X - 02-1/Y Zone 2G (as highlighted)
Concreting for Infill Wall Between BII BIV 25-26 (only 2 INNER) as highlighted Zone 1G between Gridline
Shuttering and Shear Connector for BUTTRESS BIV 36, 37 Zone 1J
Concreting for BUTTRESS BIV 36, 37 Zone 1J
Two coats of bituminous proofing coating for foundation (outer side) large mosque (as Highlighted)
Surface preparation & Base primer coating for foundation (outer side) large mosque (as Highlighted)
Steel Reinforcements CHILDCARE foundation P1, P1A Zone 2N (as highlighted)
Inspection and compaction test 8th layer for backfilling of MCPE 1 axis 03-S to 03-R (as highlighted) Z
Installation of straight UPVC Conduit sleeve (Dia.110mm) for Low Current (Security and Fire Alarms) at
Installation of straight UPVC Conduit sleeve (Dia.75mm & 110mm) for Low Current (ICT, SM Fiber Optic
Installation of straight UPVC Conduit (Dia. 25mm) and Box for Security (CAM) at the Infill Wall Axis
Installation of straight UPVC Conduit (Dia.25mm) and Box for Fire Alarm (Speaker) at the Infill Wall
Inspection & Compaction tests of 4th (Final) Layer Backfilling (Sub-Grade) (Out of 4 layers), Surround
Concrete Pouring for Blinding under Seat Walls (Outer), Inside Physic garden, as highlighted area in a
Excavation & Bed Preparation for Water Feature Line (Part 3) (HDPE 250mm & 110mm Lines) Inside Wa
Surface Preparation Prior to start Backfilling at MCPE 3 Zone 2E 2F (as highlighted)
Inspection and compaction test 1st layer for backfilling inside cafeteria building zone 2A (as highlighted
Inspection and compaction test 2nd layer for backfilling inside cafeteria building zone 2A (as highlighte
Steel Reinforcements for Infill Wall at Zone 2R between Gridline 02-2AZ - 02-2BA (as highlighted)
HDPE Pipe Installation of Water Features pipes; (300&200&160&110&90&75mmØ SDR11-PE100); As p
Inspection of Alignment for the Installed Baseplates in Crescent 01 Zone 5, 1B Inner
Inspection of Installation and Alignment for the Baseplate Frames in Butterfly Garden from Axis 01 to
'Potable Water pipes Sand Cover & Pipes Protection (30 cm above Pipes).Pipes (50 & 200 &160 & 80
Concrete Pouring & Shuttering for Walls & Columns (for Complete Height) at Grid (A&B/1-21 and A-B/1
Stack Boulders Installed Layer at level +875.60 & +876.00, along Open Channel (Geyser garden Side),
Stack Boulders Installed Layer at Level +879.00, at 5th & 6th lines, at Left Side of Water Play Garden
"Inspection of Grouting (Horizontal Joints) for Rock Boulder - RB-144 for All Layers"
"Inspection of Grouting (Vertical Joints) for Rock Boulder - RB-144 for All Layers"
Stack Boulders Installed Layers At levels +877.50, +878.00 & +878.50 at Bottom Right Side of Mist Ga
Stack Boulders Installed layers at Levels +877.05, 877.50, 878.00, 878.50, 879.00, 879.50 & 880.00, a
"Inspection And Compaction Test of Backfilling Sub Grade Above Gravel 1st Layer (1 of 2) around Man
"Inspection of Backfilling Gravel 2nd Layer (2 of 2) around Manhole MH-M-15 As Highlighted (SP#118)"
Inspection of Backfilling Sub-grade 7th Layer (7 of 8) For Foul Water Line From FW-A-13-4 to SBC incl
Inspection & Compaction tests of 8th Layer Backfilling (Sub-Grade) (Out of 10 layers) along the Walls
surface preparation prior to start backfilling inside cafeteria building zone 2A (as highlighted)
Inspection of Backfilling Sub-grade 6th Layer (6 of 8) For Foul Water Line From FW-A-13-4 to SBC incl
Inspection and compaction test 4th layer for backfilling of Strip Footing and PC between PC 31,33 (4th
Inspection & Compaction tests of 9th Layer Backfilling (Sub-Grade) along the Boundary wall (Inner Side
"Inspection for Installation of Telecommunication Line Pit - B/TL/17, B/TL/19, B/TL/21, B/TL/25, B/TL
Inspection for Installation of Fire & Security Line Pit - B/FS/05, B/FS/16, B/FS/19, B/FS/21, B/FS/22,
Inspection and compaction test 5th layer for backfilling of Strip Footing and PC between PC 131,133 (5
Inspection for Laying of GreenTiles above the pipe for Fire & Security Distribution Line from G/FS/07 t
Inspection for Laying of Green Tiles above the pipe for Telecommunication Line from G/TL/21 to G/TL/5
Installation and Survey Report for Location and Levels of Anchor Bolts for RING BEAM Zone 2L (INNER) A
Level and Location for RING BEAM Zone 2L (INNER) Axis 02-1, 02AL to 02AH (as highlighted)
Level and Location for Infill Wall between Gridline 01-1/T - 01-1/U Zone 1G (as highlighted)
"Inspection and Compaction Test for backfilling sub-grade 1st Layer (2 of 8) around SBC-06-Expansion J
"Inspection and Compaction Test for backfilling sub-grade 1st Layer (1 of 8) around SBC-06-Expansion J
"Soil Preparation prior to start backfill around SBC-06-Expansion Joint - as highlighted"
Shuttering and Scaffoldings for RING BEAM Zone 2L (INNER) Axis 02-1, 02AL to 02AH (as highlighted)
Inspection of Steel Reinforcement for the Footing and Walls of SBC-02 - Wing Wall - (As Highlighted)
Shuttering for Infill Wall between Gridline 01-1/T - 01-1/U Zone 1G (as highlighted)
Surface preparation & Base primer coating for MCPE 4 undr Foundation at Zone 1N (as Highlighted)
Steel Reinforcements for Infill Wall Between BII BIV 86-87 (INNER) as highlighted Zone 2G between Grid
Steel Reinforcements for RING BEAM Zone 2L (INNER) Axis 02-1, 02AL to 02AH (as highlighted)
Installation of straight UPVC Conduit (2x110mm) for Low Current (Fire & Security) Ductbank no. BB
Installation of straight UPVC Conduit (4x110mm) for Low Current (Telecommunication) Ductbank no.
Installation of straight UPVC Conduit (Dia.25mm) and Box for Fire Alarm (Speaker) at Infill Wall Axis
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 3 layers), along the Boundary
Steel Reinforcement for Wall of New Ticketing Booth # 7A, at highlighted area in attached drawings.
Excavation & Bed Preparation for Irrigation Sub-main Line Distribution network (Part 1) (50mm Line)
Inspection of Alignment for the Aviary Garden from Grid Line 20 to 23.
Concrete Pouring & Shuttering for Footings of Internal foundations, Inside Butterfly Garden, at high
Coordinates & Levels of Blinding for Seat Walls (Outer), Inside Physic garden, as highlighted area in a
Installation of Rock and Boulder No. RB-144 - 4th layer (4 of 4)
Installation of Rock and Boulder No. RB-144 - 3rd layer (3 of 4)
Installation of Rock and Boulder No. RB-144 - 2nd layer (2 of 4)
Excavation & Surface Preparation for Seat Walls (Outer), Inside Physic garden, as highlighted area in
"Inspection of Grouting (Horizontal Joints) for Rock Boulder - RB-289 for All Layers"
Coordinates & Levels for Walls & Columns (for Complete Height) at Grid (A&B/1-21 and A-B/1, 2, 20 &
"Inspection of Grouting (Vertical Joints) for Rock Boulder - RB-289 for All Layers"
"Inspection of Grouting (Horizontal Joints) for Rock Boulder - RB-156 for All Layers"
"Inspection of Grouting (Vertical Joints) for Rock Boulder - RB-156 for All Layers"
"Inspection of Grouting (Horizontal Joints) for Rock Boulder - RB-155 for All Layers"
"Inspection of Grouting (Vertical Joints) for Rock Boulder - RB-155 for All Layers"
"Inspection of Grouting (Horizontal Joints) for Rock Boulder - RB-318 for All Layers"
"Inspection of Grouting (Vertical Joints) for Rock Boulder - RB-318 for All Layers"
"Inspection of Grouting (Horizontal Joints) for Rock Boulder - RB-290 for All Layers"
"Inspection of Grouting (Vertical Joints) for Rock Boulder - RB-290 for All Layers"
"Inspection of Grouting (Horizontal Joints) for Rock Boulder - RB-291 for All Layers"
"Inspection of Grouting (Vertical Joints) for Rock Boulder - RB-291 for All Layers"
"Inspection of Backfilling Gravel 1ST Layer (1 of 2) around Manhole MH-M-15 As Highlighted (SP#118)"
Inspection of Backfilling Sub-grade 5th Layer (5 of 8) For Foul Water Line From FW-A-13-4 to SBC incl
Inspection and Compaction Test for backfilling 1st layer (1of 1) to cover the GreenTiles above the pipe
Inspection and Compaction Test for backfilling 1st Layer (1 of 1) to cover the Green Tiles above pipe
Inspection of Sand Covering Layer for Protection of Fire & Security Distribution Line from (G/FS/47 to
Inspection of Sand Covering Layer for Protection of Telecommunications Line from (G/TL/52 to G/TL/38
Inspection of Concrete Pouring for the Footing and Kicker of Corner Connection between SBC-01 & SBC-0
Inspection of Formwork for the Footing and Kicker of Corner Connection between SBC-01 & SBC-02 - (As
"Inspection for Blinding Concrete under Footing of Storm Box Culvert - SBC-03 - Wing Wall (As Highligh
"Inspection for the Excavation and Soil Preparation of Storm Box Culvert - SBC-03 - Wing Wall (As Highl
Inspection for Laying of GreenTiles above the pipe for Fire & Security Distribution Line from F/FS/04 t
Inspection for Laying of Green Tiles above the pipe for Telecommunication Line from F/TL/04 to G/TL/2
Inspection and compaction test 10th layer for backfilling LARGE MOSQUE (as Highlighted) Zone 1G (10th
Inspection and compaction test 5th layer for backfilling of Strip Footing and PC between PC 81 to 83 (5
Level and Location for MCPE 4 (2nd) Blinding under Foundation Zone 1N (as highlighted)
Concreting for Blinding of Retaining Wall of Zone 1D axis 01K to 01J (as highlighted)
Steel Reinforcements for Strip Footing between PC 2-4-6-8 Zone 1A (as highlighted)
Concreting for Strip Footing between PC 2-4-6-8 Zone 1A (as highlighted)
Anti Termite Application under (2nd) Blinding of MCPE 4 Foundation Zone 1N (as highlighted)
Shuttering for (2nd) Blinding of MCPE 4 Foundation Zone 1N (as highlighted)
Concreting for (2nd) Blinding of MCPE 4 Foundation Zone 1N (as highlighted)
Concrete Pouring & Shuttering for Starter (Kicker) for Wall of New Ticketing Booth # 5A, at highlighte
Coordinates & Levels of Starter (Kicker) for Wall of New Ticketing Booth # 5A, at highlighted area in
Concrete Pouring & Shuttering for Kicker (1st Lift) of Boundary wall Span 50B, 51, 52, 53, 54 & 55, As
Coordinates & Levels for Kicker (1st Lift) of Boundary wall Span 50B, 51, 52, 53, 54 & 55, As per Atta
Stone Cladding for Boundary wall (Inner Face) at Elevation "D & E" @ Sound & Light Garden, As per A
Stone Coping on 2 Straight walls at Entrance @ Grid (EXC1-4/5 to EXC3-01/10 and EXC1-12/13 to EXC3
Stone Coping on Walls of Outer Canopy 2 and on Boundary walls @ Grid (EXC4-9/10 to 01/02 and EXC4
Stone Cladding for Walls (Inner Face) at Outer Canopy 1 and for Walls (Outer Face) from Inside the P
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 3 layers), along the Boundary
Steel Reinforcement for Kickers of Boundary wall Span 50B, 51, 52, 53, 54 & 55, As per Attached High
Surface Preparation Prior to Water proofing on Wall & footing (Outer side) at Grid (A/1-21) (Outer wa
Surface Preparation Prior to Water proofing for Footing & Kicker of (Existing) Boundary wall (Inner Side
Surface Preparation Prior to Water proofing for Footings & Kickers of New Ticket Booths # 1A, 2A (Inn
Surface Preparation Prior to Water proofing for Footings of Canopy Foundations (16 no's) at Grid (A &
"Inspection of Grouting (Horizontal Joints) for Rock Boulder - RB-287 for All Layers"
"Inspection of Grouting (Vertical Joints) for Rock Boulder - RB-287 for All Layers"
"Inspection of Grouting (Horizontal Joints) for Rock Boulder - RB-275 for All Layers"
"Inspection of Grouting (Vertical Joints) for Rock Boulder - RB-275 for All Layers"
"Inspection of Grouting (Horizontal Joints) for Rock Boulder - RB-274 for All Layers"
"Inspection of Grouting (Vertical Joints) for Rock Boulder - RB-274 for All Layers"
"Inspection of Grouting (Horizontal Joints) for Rock Boulder - RB-316 for All Layers"
"Inspection of Grouting (Horizontal Joints) for Rock Boulder - RB-315 for All Layers"
"Inspection of Grouting (Horizontal Joints) for Rock Boulder - RB-284 for All Layers"
"Inspection of Grouting (Vertical Joints) for Rock Boulder - RB-284 for All Layers"
Installation of Rock and Boulder No. RB-155 - 4th layer (4 of 4)
Installation of Rock and Boulder No. RB-156 - 5th layer (5 of 5)
Installation of Rock and Boulder No. RB-156 - 4th layer (4 of 5)
Inspection for Installation Of Isolation Fire Water Line Pit B/F/15- as highlighted
Inspection of Water proofing for the Duct Bank of MV Line from B/MV/16 to B/MV/12 at Zone- B (As Hig
Surface Preparation prior to start water proofing for the Duct Bank of MV Line from B/MV/16 to B/MV/1
Inspection of Sand Covering Layer for Protection of MV Line from (G/MV/18 to G/MV/14) at Zone-G as h
Inspection of Steel Reinforcement (Horizontal) for the Wing Walls of SBC-09 - (As Highlighted)
Installation of straight UPVC Conduit (2x110mm) for Low Current (Fire and Security) Ductbank no.K
Installation of straight UPVC Conduit (4x110mm) for Low Current (Telecommunication) Ductbank no.K
Inspection and Compaction Test for backfilling sub-grade 1st Layer (1 of 5) above the Sand cover for Fi
Inspection and Compaction Test for backfilling sub-grade 1st Layer (1 of 3) above the Sand cover for P
Inspection and Compaction Test for backfilling sub-grade 1st Layer (1 of 3) above the Sand cover for P
Inspection and Compaction Test for backfilling sub-grade 2nd Layer (2 of 4) above the Sand cover for Fi
Installation of straight UPVC Conduit sleeve (Dia.75mm & 160mm) for Power and Emergency at Physic G
Inspection and Compaction Test for backfilling Sub-grade above gravel 1st Layer (1 of 1) around Manhol
Inspection and Compaction Test for Backfilling Sub-grade above gravel 1st Layer (1 of 1) around Manho
Inspection of Backfilling Gravel 2nd Layer (2 of 3) around Manhole for MH-A-11, as Highlighted (SP#118)
"Inspection of Thrust Block for UPVC Pipe (200mm) for Potable Water Line at Zone-K - As Highlighted i
Inspection of Thrust Block for UPVC Pipe (250 mm Dia) for Fire Water Line at Zone- B - As Highlighted i
Installation of straight UPVC conduit (4x160mm) for Medium Voltage Ductbank no. GG/D-MV/21 (M
'Bedding of Gravel 3/8" and Geotextile surrounding in pipes ( 450 mm Ø- UPVC Pipes-Class 4 ) for St
'Pipe Installation of Strom Water pipe OUT FALL-M for (450 mmØ-UPVC pipes-Class 4) from ( MH-M-1
Installation of Main Potable Water Pipes (200&50mmØ-UPVC-Class-5) in Between Point (648025.794
Weld Visual & NDT Inspection of Crescent 02 Zone 3 - 2N & 2M (Axis AP) as per highlighted in attac
Pre-Assembly bolt tightening inspection of Crescent 02, Zone 3 2N & 2M - axis 02AP to 02AM (as per
Inspection and compaction test 5th layer for backfilling of Strip Footing and PC between PC 93,95,97 (5
Inspection and compaction test 9th layer for backfilling LARGE MOSQUE (as Highlighted) Zone 1G (9th of
Inspection and compaction test 6th layer for MCPE 2 Zone 2G 2H 2J 2K axis ( 1-1 to E ) (as highlighted)
Surface Preparation and Solvent base primer under Promenade bridge abutment foundation at Zone 4, 1
Cementitious water proofing under Promenade bridge abutment foundation at Zone 4, 1E 1F, Grid 01P (
Two layer of 4mm thick modified bituminous water proofing membrane under Promenade bridge abutmen
Protection layer of 4mm thick bituminous protection board under Promenade bridge abutment foundatio
Installation of straight UPVC Conduit (Dia.25mm) and Box for Voice and Data (WIFI &Data) at the M
Installation of straight UPVC Conduit (Dia.25mm) and Box for Security (Card Reader,Magnetic Lock
Installation of stub-up UPVC Conduit (Dia. 50mm) for Lighting in Neck Column at grid A-B/1 to 8 at th
Installation of stub-up UPVC Conduit (Dia. 32mm) for Power (earthing) in Neck Column at grid A-B/1 t
"Inspection of Grouting (Horizontal Joints) for Rock Boulder - RB-276 for All Layers"
"Inspection of Grouting (Vertical Joints) for Rock Boulder - RB-276 for All Layers"
"Inspection of Grouting (Horizontal Joints) for Rock Boulder - RB-115a for All Layers"
"Inspection of Grouting (Vertical Joints) for Rock Boulder - RB-115a for All Layers"
"Inspection of Grouting (Horizontal Joints) for Rock Boulder - RB-115 for All Layers"
Installation of Main Fire Water Pipes (250 & 160 mmØ-UPVC-Class-5) From Pit( B/F/04 to B/F/05 ) I
"Inspection of Grouting (Vertical Joints) for Rock Boulder - RB-115 for All Layers"
Installation of Rock and Boulder No. RB-318 - 5th layer (5 of 5)
"Inspection of Grouting (Horizontal Joints) for Rock Boulder - RB-293 for All Layers"
Installation of Main Potable Water Pipes (200mmØ-UPVC-Class-5) in Between Point (647554.374 East
"Inspection of Grouting (Vertical Joints) for Rock Boulder - RB-293 for All Layers"
"Inspection of Grouting (Horizontal Joints) for Rock Boulder - RB-292 for All Layers"
"Inspection of Grouting (Vertical Joints) for Rock Boulder - RB-292 for All Layers"
'Fire Fighting pipes Sand Cover & Pipes Protection (30 cm above Pipes). As per highlighted Area in th
Installation of Rock and Boulder No. RB-318 - 4th layer (4 of 5)
Installation of Rock and Boulder No. RB-318 - 3rd layer (3 of 5)
INSPECTION FOR INSTALLATION OF ALL RINGS (RISER) And Slab FOR MH-M-14, (As Highlighted)
"Inspection For Manhole Base Installation And UPVC Pipe Connection For MH-M-14 as highlighted "
Inspection of Reinforced Concrete Pouring for Duct Bank of Fire & Security line for B/RC-FS/8 at Zone-B
"Inspection of Formwork for Duct Bank of Fire & Security line for B/RC-FS/8 at Zone-B - As Highlighted"
"Inspection of Steel Reinforcement for Duct Bank of Fire & Security line for B/RC-FS/8 at Zone-B - As Hi
Inspection of Reinforced Concrete Pouring for Duct Bank of Telecommunications line for B/RC-TL/11 at
Steel Reinforcement for Walls & Columns (for Complete Height) at Grid (A/2-20) @ Butterfly Garden,
Concrete Pouring & Shuttering for Lintels of Doors & Block work & Stiffner Column's for all walls Insid
Steel Reinforcement & Shuttering for Lintels of Doors & Block work & & Stiffner Column's for all walls
Inspection & Compaction tests of 7th Layer Backfilling (Sub-Grade) (Out of 10 layers) along the Walls
Inspection & Compaction tests of 8th Layer Backfilling (Sub-Grade) along the Boundary wall (Inner Side
Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Grade) (Out of 4 layers), Surround Pargola
Sand Cover & Pipes Protection for Water Feature Line (63mmØ) from centre to outside, beside Plant
Sand Bedding for Water Feature Line (Part 2) (HDPE 160mm, 110mm & 90mm Lines) Inside Water play
Inspection of Formwork for Duct Bank of Telecommunications line for B/RC-TL/11 at Zone-B - As Highlig
Inspection of Steel Reinforcement for Duct Bank of Telecommunications line for B/RC-TL/11 at Zone-B -
Inspection and Compcation Test for backfilling Sub-grade 1st Layer (1 of 1) above Red Tiles for MV L
Inspection and Compaction Test for backfilling 1st Layer (1 of 1) to cover the GreenTiles above the pi
Inspection and Compaction Test for backfilling 1st Layer (1 of 1) to cover the GreenTiles above the
Inspection for Laying of GreenTiles above the pipe for Fire & Security Distribution Line from G/FS/30 t
Inspection for Laying of Green Tiles above the pipe for Telecommunication Line from G/TL/50 to K/TL/0
"Inspection and Compaction Test for backfilling Sub-grade 5th Layer (5 of 5) for Foul Water Line fr
"Inspection And Compaction Test of Backfilling Sub Grade (1 of 7) For Manholes FW-A-7, FW-A-8, FW-A
Inspection of Erectied Steel in Butterfly Garden (as per the highlighted area in the drawing)
Inspection of Erectied Steel in Aviary Garden from Grid Line 18 to 23 (as per the highlighted area in t
Level and Location for BUTTRESS BIV 33, 34, 35 Zone 1H 1J
Level and Location for BUTTRESS BII 29, 30, 31, 32 (with beam) Zone 1H 1G
Level and Location for Infill Wall between Gridline 01-1T - 01-1U - 01-S Zone 1G (as highlighted)
Level and Location for Infill Wall kicker between Gridline 02Y - 02Z, 02-1 Zone 2H (as highlighted)
Inspection of alignment for the crescent 2 Zone 2Q (Axis 02AZ to 02AW)
Shuttering and Shear Connector for BUTTRESS BIV 33, 34, 35 Zone 1H 1J
Concreting for BUTTRESS BIV 33, 34, 35 Zone 1H 1J
Shuttering and Shear Connector for BUTTRESS BII 29, 30, 31, 32 (with beam) Zone 1G 1H
Concreting for BUTTRESS BII 29, 30, 31, 32 (with beam) Zone 1G 1H
Shuttering for Infill Wall between Gridline 01-1T - 01-1U - 01-S Zone 1G (as highlighted)
Shuttering for Infill Wall kicker between Gridline 02Y - 02Z, 02-1 Zone 2H (as highlighted)
Steel Reinforcements for Infill Wall kicker between Gridline 02Y - 02Z, 02-1 Zone 2H (as highlighted)
Inspection and compaction test 8th layer for backfilling LARGE MOSQUE (as Highlighted) Zone 1G (8th of
Inspection and compaction test 3rd layer for backfilling of Strip Footing and PC between PC 81 to 83 (3
Inspection and compaction test 4th layer for backfilling of Strip Footing and PC between PC 81 to 83 (4
Inspection and compaction test 2nd layer for backfilling of Strip Footing and PC between PC 31,33 (2nd
Inspection and compaction test 3rd layer for backfilling of Strip Footing and PC between PC 31,33 (3rd
Inspection and compaction test 4th layer for backfilling of Strip Footing and PC between PC 131,133 (4
Cementitious waterproofing under the retaining wall foundation for zone 1D at axis 01k-01j (as highig
surface preparation & solvent base primer under the retaining wall foundation for zone 1D at axis 01k-
First layer 4mm thick modified bituminous waterproofing membrane under the retaining wall foundati
Installation of straight UPVC Conduit (Dia.25mm) and Box for Fire Alarm (Speaker) at Infill Wall Axis
Installation of straight UPVC Conduit (2x110mm) for Low Current (Fire & Security) Ductbank no. KK/
Installation of straight UPVC Conduit (4x110mm) for Low Current (Telecommunication) Ductbank no.
Installation of Rock and Boulder No. RB-156 - 3rd layer (3 of 5)
Inspection of Sand Covering Layer for Protection of Fire & Security Distribution Line from (G/FS/25 to
Inspection of Sand Covering Layer for Protection of Telecommunications Line from (G/TL/39 to G/TL/45
Inspection of Sand Covering Layer for Protection of MV Line from (G/MV/12 to G/MV/13) at Zone-G as h
Inspection of Sand bedding under pipe for Fire & Security Distribution Line from B/FS/15 to B/FS/17 at
Inspection of Sand bedding under pipe for Telecommunication Line between B/TL/12 to B/TL/15 at Zone
Inspection of Backfilling Sub-grade above gravel 1st Layer (1 of 1) around Manholes for MH-H-01, MH-
Inspection And Compaction Test of Backfilling Sub-grade 10th Layer (10 of 10) For Foul Water Line F
Inspection for Blinding Concrete under Fire & Security Line Pit K/FS/01, K/FS/04, K/FS/05, K/FS/06, K/FS
"Inspection for Blinding Concrete under Telecommunication Line Pit K/TL/01, K/TL/08, K/TL/09, K/TL/10,
Inspection for Laying of GreenTiles above the pipe for Fire & Security Distribution Line from G/FS/40 t
Inspection for Laying of Green Tiles above the pipe for Telecommunication Line from G/TL/26 to G/TL/2
Inspection and Compaction Test for backfilling 1st Layer (1 of 1) to cover the GreenTiles above the pi
Inspection and Compaction Test for backfilling 1st Layer (1 of 1) to cover the GreenTiles above the
"Excavation for Storm Water Line from MH-M-06 to MH-M-04 including Manhole MH-M-05, MH-M-04 -
"Inspection and Compaction Test for backfilling Sub-grade 4th Layer (4 of 5) for Foul Water Line fr
"Inspection for Blinding Concrete under Footing of Storm Box Culvert - SBC-02 - Wing Wall (As Highligh
"Inspection for the Excavation and Soil Preparation of Storm Box Culvert - SBC-09 - Wing Wall (2nd Part
Installation of straight UPVC conduit (4x160mm) for Medium Voltage Ductbank no. GG/D-MV/15 (M
Concrete Pouring & Shuttering for Starter (Kicker) for Wall of New Ticketing Booth # 6A, at highlighte
Coordinates & Levels of Starter (Kicker) for Wall of New Ticketing Booth # 6A, at highlighted area in
Excavation & Bed Preparation for Water Feature Line (Part 2) (HDPE 160mm, 110mm & 90mm Lines) In
Block work Upto Lintel height for all walls, Inside Site Tower 2, as per the highlighted attached Drawi
Surface Preparation Prior to start Backfilling at Strip footing & PC between PC 81 to 83 Zone 1N (as high
Inspection and compaction test 5th layer for MCPE 2 Zone 2G 2H 2J 2K axis ( 1-1 to E ) (as highlighted)
Inspection and compaction test 4th layer for backfilling of Strip Footing and PC between PC 93,95,97 (4
Inspection and compaction test 3rd layer for backfilling of Strip Footing and PC between PC 131,133 (3
Inspection and compaction test 4th layer for backfilling of Strip Footing and PC between PC 32,34 (4th
Inspection and compaction test 4th layer for backfilling of TUNNEL 1 (between axis 02-1 & 02-2) as hig
Inspection and compaction test 1st layer for backfilling of Strip Footing and PC between PC 81 to 83 (1s
Inspection and compaction test 2nd layer for backfilling of Strip Footing and PC between PC 81 to 83 (2
Weld Visual & NDT Inspection of Crescent 02 Zone 2 - 2N (Axis AQ & AR) as per highlighted in attac
Steel Reinforcements for MCPE 4 retaining walls at axis 01AP Zone 1N (as highlighted)
Installation of straight UPVC Conduit (Dia. 32mm) for Power (Socket Outlet) at the Buttress Axis (01/
Installation of earthing clamps with conductor 70mm (1pc.) for earthing reinforcement steel re-bar at
Installation of straight UPVC Conduit (Dia. 32mm) for Power (Socket Outlet) at the Buttress Axis (01/
Installation of straight UPVC Conduit (Dia. 25mm) and Box for Security (CAM) at the Buttress Axis (01
Installation of straight UPVC Conduit (Dia. 25mm) and Box for Voice and Data (WIFI & CAM) at the But
HDPE Pipe Installation of Water Features pipes; (63mmØ CLASS-PE100); As per High lighted Attache
Gravel 3/8 Bedding & Geotextile Surround for Sub surface Drainage pipes (110mm Pipes) along the Boun
Stack Boulders Installed layers at Levels +879.00, 879.50, 880.00, 880.50, 881.00, 881.50 & 882.00
Stack Boulders Installed layers at Levels +878.50, +879.00 & +879.50, along Boundary wall (at span 19
Stack Boulders Installed Layer at level +875.20, along Open Channel (Geyser garden Side), (Part 1), a
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 6 layers) along the Bound
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 6 layers) Surround the Foot
Coordinates & Levels for Footing of Circular Walls (Remaining parts), inside Maze garden, as highligh
Concrete Pouring & Shuttering for Footing of Circular Walls (Remaining parts), inside Maze garden, as
Steel Reinforcement for Footing & Kicker of Circular Walls (Remaining parts), inside Maze garden, as
Concrete Pouring & Shuttering for Footings of Boundary wall Span 50B, 51, 52, 53, 54 & 55, As per At
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 5 layers) Surround the Ma
Installation of Rock and Boulder No. RB-155 - 3rd layer (3 of 4)
Excavation for Fire & Security Distribution Line from B/FS/36 to G/FS/17, including Pit B/FS/36, B/FS/2
Excavation for Telecommunication Line between B/TL/36 to G/TL/32 including pit B/TL/36, B/TL/35, G/
Inspection and Compaction Test for NGL of Telecommunication and Fire & Security Line from B/TL/12 to
"Inspection of Backfilling Sub-grade 2nd Layer (2 of 3) around Gullies for G-H-21, G-H-20, G-H-19, G
Inspection for Laying of Red Tiles above the pipe for MV Line from G/MV/27 to G/MV/05 at Zone-G as h
"INSPECTION FOR INSTALLATION OF SLABS FOR (MH-H-01, MH-H-02, MH-H-03) (As Highlighted)."
Inspection for Laying of GreenTiles above the pipe for Fire & Security Distribution Line from G/FS/38 t
Inspection for Laying of Green Tiles above the pipe for Telecommunication Line from G/TL/38 to G/TL/2
Inspection and Compaction Test for backfilling sub-grade 1st Layer (1 of 2) above the Sand cover for Fi
Inspection of Concrete Encasement for Storm Water Line Pipe 800mm dia (Connection to the existing cul
"Inspection and Compaction Test for backfilling Sub-grade 3rd Layer (3 of 5) for Foul Water Line fr
INSPECTION FOR INSTALLATION OF SLABS FOR (MH-A-14) (As Highlighted).
"INSPECTION OF INSTALLATION OF ALL RINGS (RAISER) AND SLAB FOR FW-A-13-7, (AS ATTACHED)"
INSPECTION OF INSTALLATION OF SLAB FOR FW1-2 (AS ATTACHED)
Inspection and compaction test 12th layer for backfilling of MCPE 1 (as highlighted) Zone 2M 2N (12th
"Inspection for Casting the Concrete encasement and Surface Preperation prior to start waterproofing
Inspection of Sand Covering Layer for Protection of Fire & Security Distribution Line from (G/FS/52 to
Surface Preparation Prior to start Backfilling at Strip footing & PC between PC 31-33 Zone 1F (as highlig
"Inspection For Manhole Base Installation And UPVC Pipe Connection For MH-G-01, MH-G-01-1, MH-
INSPECTION FOR INSTALLATION OF SLABS FOR (FW6-1) - As Highlighted
"INSPECTION FOR INSTALLATION OFSLAB FOR MH-B-01, MH-B-02, MH-B-03, MH-B-04 .(As Highlighted)"
INSPECTION FOR INSTALLATION OF ALL RINGS FOR FW-A-3-7. (As Highlighted)
Inspection and compaction test 12th layer for backfilling of MCPE 1 axis 03-S to 03-R (as highlighted)
Inspection and compaction test 1st layer for backfilling of Strip Footing and PC between PC 31,33 (1st
Inspection and compaction test 4th layer for MCPE 2 Zone 2G 2H 2J 2K axis ( 1-1 to E ) (as highlighted)
Inspection and compaction test 2nd layer for backfilling of Strip Footing and PC between PC 131,133 (2
Inspection and compaction test 3th layer for backfilling of Strip Footing and PC between PC 93,95,97 (3
Inspection and compaction test 4th layer for backfilling LARGE MOSQUE (second part ) (as Highlighted)
Inspection and compaction test 5th layer for backfilling LARGE MOSQUE (second part ) (as Highlighted)
Inspection and compaction test 6th layer for backfilling LARGE MOSQUE (second part ) (as Highlighted)
Inspection and compaction test 7th layer for backfilling LARGE MOSQUE (as Highlighted) Zone 1G (7th of
Level and Location for MCPE 1 Inner Wall at axis 03-1, 03S - 03T Zone 2N 2M (as highlighted) upto (871
Shuttering for MCPE 1 Inner Wall at axis 03-1, 03S - 03T Zone 2N 2M (as highlighted) upto (871.25)
Concreting for MCPE 1 Inner Wall at axis 03-1, 03S - 03T Zone 2N 2M (as highlighted) upto (871.25)
Concreting for RING BEAM Zone 1C (INNER) Axis 01-1, 01G to 01J (as highlighted)
Concreting for MCPE 4 Foundation at axis 01AP Zone 1N (as highlighted)
Protection layer of 4mm thick bituminous protection board for MCPE 2 Wall (as Highlighted) ZONE 2H A
Installation of straight UPVC Conduit (Dia.32mm) for Power(Socket Outlet) at Crescent-01 (Buttress Ax
Installation of straight UPVC Conduit (Dia.25mm) and Box for Fire Alarm (Speaker) at Buttress Axis (0
Installation of Rock and Boulder No. RB-156 - 2nd layer (2 of 5)
"Inspection of Grouting (Horizontal Joints) for Rock Boulder - RB-236 for All Layers"
"Inspection of Grouting (Vertical Joints) for Rock Boulder - RB-236 for All Layers"
Weld Visual & NDT Inspection of Crescent 02 Zone 2 - 2P & 2N (Axis AT & AS) as per highlighted in a
Installation and Survey Report for Location and Levels of Anchor Bolts for RING BEAM Zone 1C (OUTER) A
Installation of Rock and Boulder No. RB-155 - 2nd layer (2 of 4)
"Inspection of Thrust Block for UPVC Pipe (200mm) for Potable Water Line at Zone-F&G - As Highlighte
"Inspection for the Excavation and Soil Preparation of Storm Box Culvert - SBC-02 - Wing Wall (As Highl
Inspection of Steel Reinforcement for the Footing and Walls of Corner Connection between SBC-01 & SB
Inspection of Concrete (Plain) Pouring for Duct Bank of Fire & Security line between B/FS/38 and B/RC-
Inspection of Reinforced Concrete Pouring for Duct Bank of Fire & Security line for B/RC-FS/10 at Zone-B
Inspection of Formwork for Duct Bank of Fire & Security line between B/FS/38 and B/RC-FS/18 at Zone-B
Inspection and compaction test 1st layer for backfilling of Strip Footing and PC between PC 131,133 (1s
"Inspection of Steel Reinforcement for Duct Bank of Fire & Security line for B/RC-FS/10 at Zone-B - As
Inspection and compaction test 2nd layer for backfilling of Strip Footing and PC between PC 93,95,97 (
Inspection and compaction test 3rd layer for backfilling of Strip Footing and PC between PC 32,34 (3rd
"Inspection and Compaction Test for backfilling Sub-grade 2nd Layer (2 of 5) for Foul Water Line fr
Inspection and compaction test 3rd layer for MCPE 2 Zone 2G 2H 2J 2K axis ( 1-1 to E ) (as highlighted)
Inspection of Concrete (Plain) Pouring for Duct Bank of Telecommunications line between B/TL/40 and
Inspection and compaction test 2nd layer for backfilling of TUNNEL 1 (between axis 02-1 & 02-2) as hig
Inspection of Reinforced Concrete Pouring for Duct Bank of Telecommunications line for B/RC-TL/12 at
Inspection and compaction test 3rd layer for backfilling of TUNNEL 1 (between axis 02-1 & 02-2) as hig
Inspection of Formwork for Duct Bank of Telecommunications line between B/TL/40 and B/RC-TL/40 at
Inspection of Steel Reinforcement for Duct Bank of Telecommunications line for B/RC-TL/12 at Zone-B -
Inspection for Laying of GreenTiles above the pipe for Fire & Security Distribution Line from G/FS/19 t
Inspection for Laying of Green Tiles above the pipe for Telecommunication Line from G/TL/16 to G/TL/3
Level and Location for RING BEAM Zone 1C (OUTER) Axis 01-2, 01G to 01J (as highlighted)
Inspection and Compaction Test for backfilling sub-grade 1st Layer (1 of 1) above the Sand cover for Fi
Level and Location for BUTTRESS BOI 29, 30, 31, 32 (with beam) Zone 1G 1H
Level and Location for Infill Wall Kicker Between BII BIV 88-89 (INNER) as highlighted Zone 2G between
Inspection for application of Protection Board on top of Damp Proofing for External wall and Top Slab o
Level and Location for Strip Footing between PC 2-4-8 Zone 1A (as highlighted)
Inspection for application of Damp Proof (1st Coat & 2nd Coat) on top of Primer for External Wall and
Level Location for Tunnel 2 shaft wall (part A) at zone 2F (as highlighted)
Inspection for application of Primer (1 Coat) on External Wall and Top Slab of SBC-06 - Expansion Joint (
Surface Preparation prior to start Waterproofing for SBC-06 - Expansion Joint - as highlighted
Level and Location for BUTTRESS BOI BOV 33, 34, 35, 36 Zone 1H 1J (as highlighted)
Shuttering and Scaffoldings for RING BEAM Zone 1C (OUTER) Axis 01-2, 01G to 01J (as highlighted)
Concreting for RING BEAM Zone 1C (OUTER) Axis 01-2, 01G to 01J (as highlighted)
"Inspection of backfilling Gravel 1st Layer ( 1 of 2) around Manhole for FW1-3 - as highlighted.(SP # 118
Steel Reinforcements for MCPE 1 Column c9-10-11-12-13-14-15-16-17-18-19-20-21-22 at axis 03/2V to
Soil Preparation prior to start backfilling Gravel around Manhole for FW1-3 - as highlighted.
Inspection And Compaction Test of Backfilling Sub Grade Above Gravel 2nd Layer (2 of 3) around Manh
Shuttering and Shear Connector for BUTTRESS BOI 29, 30, 31, 32 (with beam) Zone 1G 1H
"Inspection And Compaction Test of Backfilling Sub Grade Above Gravel 4th Layer (4 of 4) around Manh
Concreting for BUTTRESS BOI 29, 30, 31, 32 (with beam) Zone 1G 1H
Steel Reinforcements & Shear Connector for RING BEAM Zone 1C (OUTER) Axis 01-2, 01G to 01J (as high
Inspection And Compaction Test of Backfilling Sub Grade 2nd Layer (2 of 4) For Storm Water Line F
Protection layer of 4mm thick Bituminous protection board for Wall (inner 2nd part) upto SOG of Larg
"Inspection And Compaction Test of Backfilling Sub Grade Above Gravel 2nd Layer (2 of 4) around Ma
Shuttering for Infill Wall Kicker Between BII BIV 88-89 (INNER) as highlighted Zone 2G between Gridline
Inspection And Compaction Test of Backfilling Sub-grade 9th Layer (9 of 9) For Foul Water Line From
Steel Reinforcements for Infill Wall Kicker Between BII BIV 88-89 (INNER) as highlighted Zone 2G betwe
Inspection And Compaction Test of Backfilling Sub-grade 9th Layer (9 of 9) For Foul Water Line From
Inspection And Compaction Test of Backfilling Sub-grade 6th Layer (6 of 8) For Foul Water Line From
"Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 5) for Foul Water Line fro
Notification to start Rough Grading upto (-75cm) from top of Asphalt in Road area and (-20cm) from FGL
Installation of straight UPVC Conduit (4x110mm) for LC (Telecommunication) DB no. GG/D-TL/02 (M
Installation of straight UPVC Conduit (2x110mm) for LC (Fire & Security) DB no. GG/D-FS/15 (Man
Installation of PVC Conduit Sleeves Passing the Concrete (3x75mm) for Low Voltage (Power System) at
Installation of PVC Conduit Sleeves Passing the Concrete (2x75mm) for Low Current (Telecom) at Butte
Installation of PVC Conduit Sleeves Passing the Concrete (3x75mm) and (2x75mm) for Low Current (Fire
Grouting of Installed Anchor bolt and under Baseplate at Zone 2K outer ring beam (as highlighted) usi
Grouting of Installed Anchor bolt and under Baseplate at Zone 2K outer ring beam (as highlighted) usin
Grouting of Installed Anchor bolt and under Baseplate at Zone 2J outer ring beam (as highlighted) usin
Grouting of Installed Anchor bolt and under Baseplate at Zone 2J outer ring beam (as highlighted) usin
Concreting for TUNNEL 2 Shaft wall (part A) at Zone 2F (as highlighted)
Shuttering for TUNNEL 2 Shaft wall (part A) at Zone 2F (as highlighted)
Surface preparation prior to water proofing for Foundation of Boundary wall (Outer Face) @ Grid (1-1
Coordinates & Levels for Footings of Boundary wall Span 50B, 51, 52, 53, 54 & 55, As per Attached Hi
Inspection & Compaction tests of 6th Layer Backfilling (Sub-Grade) (Out of 7 layers) along the Walls (
Inspection & Compaction tests of 7th Layer Backfilling (Sub-Grade) along the Boundary wall (Inner Side
Stack Boulders Installed Layer at level +874.80, along Open Channel (Geyser garden Side), (Part 1), a
Stack Boulders Installed layers at Levels +878.50, +879.00, +879.50 & +880.00, along Boundary wall (a
Shuttering and Shear Connector for BUTTRESS BOI BOV 33, 34, 35, 36 Zone 1H 1J (as highlighted)
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 5 layers), along the Boun
Stack Boulders Installed Layers upto Levels +879.50 & +888.00 at Top & Left Side of Mist Garden (Part
Concreting for BUTTRESS BOI BOV 33, 34, 35, 36 Zone 1H 1J (as highlighted)
Stack Boulders Installed Layers at Levels +878.50, +879.00, +879.50 & +880.00, at Right Side of Mist
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 4 layers), Surround Pargola
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 4 layers), Surround Pargola
Stack Boulders Installed Layer at Level +878.50, at 4th line, at Left Side of Water Play Garden (Part 2
'Fire Fighting pipes Sand Cover & Pipes Protection (30 cm above Pipes). As per highlighted Area in th
Pipes Sand Cover and Protection of Potable Water Networks for (200mmØ-UPVC-Class-5). As per high
'Potable Water Pipes Sand Cover & Pipes Protection (30 cm above Pipes). As per highlighted Area in
Pipes Sand Cover and Protection of Potable Water Networks for (200mmØ-UPVC-Class-5). As per high
'Fire Fighting Networks Sand Cover & Pipes Protection (30 cm above Pipes). As per highlighted Area
'Potable Water pipes Sand Cover & Pipes Protection (30 cm above Pipes). As per highlighted Area in
Installation of straight UPVC Conduit (4x110mm) for Low Current (Telecommunication) Ductbank no.GG
Installation of straight UPVC Conduit (2x110mm) for Low Current (Fire & Security) Ductbank no.GG/D-
Installation of Rock and Boulder No. RB-156 - 1st layer (1 of 5)
Installation of Rock and Boulder No. RB-318 - 2nd layer (2 of 5)
Inspection And Compaction Test of Backfilling Sub Grade Above Gravel 1st Layer (1 of 3) around Manho
"Inspection of Backfilling Sub-grade 1st Layer (1 of 3) around Gullies for G-H-21, G-H-20, G-H-19, G-
Inspection of Backfilling Gravel 1st Layer (1 of 2) around Manholes for MH-H-01, MH-H-02, MH-H-03 - A
Inspection of Sand Covering Layer for Protection of MV Line from (B/MV/25 to B/MV/02) at Zone-G as h
Inspection and Compaction Test for Backfilling Sub-base 1st Layer (1 of 1) under 3rd lift of Rock for Bou
Inspection and Compaction Test for Backfilling Subgrade 1st Layer (1 of 1) under 3rd lift of Rock for Bou
Inspection of Sand Covering Layer for Protection of MV Line from (G/MV/18 to G/MV/03) at Zone-G as h
Inspection of Concrete (Plain) Pouring for the Duct Bank of MV Line from F/MV/04 to G/MV/01 at Zone
Excavation for Fire & Security Distribution Line from B/FS/15 to B/FS/17, including Pit B/FS/15, B/FS/17
Excavation for Telecommunication Line between B/TL/12 to B/TL/15 including pit B/TL/12, B/TL/15 at Z
Stack Boulders Installed Layers at levels +873.20, +873.60, +874.00 & +874.40, along Open Channel (B
"Excavation for Storm Water Line from MH-M-11 to MH-M-06 including Manhole MH-M-11, MH-M-10
Stack Boulders Installed Layers at levels +874.00 & +874.40, along Open Channel (Geyser garden Side)
Soil preparation prior to Backfilling along the Boundary wall (Existing) Outer Side, (At Existing surfac
Pipe Installation of Sub-Surface Drainage (Main Line & Branches) Pipes; (110mmØ, UPVC-CLASS-4)
Sand Bedding for Water Feature Lines (Part 1) (HDPE 300mm Main line & 3 Sub lines of 75mm) Inside
Stone Coping on Boundary walls at Elevation "G, H, A, Whispering Cave-2 & B" @ Sound & Light Garde
Stone Cladding for Boundary wall (Inner Face) at Elevation "B & C" @ Sound & Light Garden, As per A
Sand Bedding for Water Feature Line (63mmØ) from centre to outside, beside Plant room, at Maze gar
Inspection and Compaction Test for backfilling 1st Layer (1 of 2) to cover the GreenTiles above the pi
Inspection and compaction test 6th layer for backfilling LARGE MOSQUE (as Highlighted) Zone 1G (5th of
Inspection and compaction test 8th layer for backfilling of Strip Footing and PC between PC 150-152 (7t
Inspection and compaction test 2nd layer for MCPE 2 Zone 2G 2H 2J 2K axis ( 1-1 to E ) (as highlighted)
Level and Location for Ground Beam between PC 80-82 Zone 1N (as highlighted)
Level and Location for CHILDCARE foundation P6, raft, P1A, P4 Zone 2N (as highlighted)
Two coat of bituminous waterproofing coating for Wall (inner 2nd part) upto SOG of Large Mosque (as
Steel Reinforcement for Infill Wall between Gridline 01-1T - 01-1U Zone 1G (as highlighted)
Surface preparation and solvent base primer for RC Strip footing between PC 81-83 Zone 1N (as Highlig
Surface preparation and solvent base primer under Strip footing between PC 79-81 Zone 1N (as Highligh
Single layer of 4mm thick modified bitumibous waterproofing membrane under Strip footing between P
Geotextile Protection sheet and Screed under Strip footing between PC 79-81 Zone 1N (as Highlighted)
Concreting for Mass Concrete of Strip Footing Between (2nd layer) PC 81-83, 80-82-84 Zone 1N (as highl
Concreting for Mass Concrete (1st) of Strip Footing Between PC 81-83, 80-82-84 Zone 1N (as highlighted
Concreting for Mass Concrete of Strip Footing Between (2nd layer) PC 79-81 Zone 1N (as highlighted)
Concreting for Strip Footing between PC 81-83 Zone 1N (as highlighted)
Steel Reinforcements for Ground Beam between PC 80-82 Zone 1N (as highlighted)
Shuttering for Ground Beam between PC 80-82 Zone 1N (as highlighted)
Concreting for Ground Beam between PC 80-82 Zone 1N (as highlighted)
Steel Reinforcements CHILDCARE foundation P6, raft, P1A, P4 Zone 2N (as highlighted)
Shuttering of CHILDCARE foundation P6, raft, P1A, P4 Zone 2N (as highlighted)
Inspection of Grouting (Vertical Joints) for Rock Boulder - RB-316 for All Layers.
Inspection of Grouting (Vertical Joints) for Rock Boulder - RB-315 for All Layers.
Inspection of Concrete Pouring for the Wall and Slab of Extension Area of SBC-05 - (As Highlighted).
Inspection and Compaction test for NGL of Foul Water Line from FW5 to FW8 including Manhole FW5,
Inspection and Compaction Test for Backfilling Sub-base 1st Layer (1 of 1) under 2nd lift of Rock for
Inspection for Casting the Concrete encasement and Surface Preperation prior to start waterproofing
Inspection and Compaction Test for Backfilling Subgrade 1st Layer (1 of 1) under 2nd lift of Rock for
Inspection and Compaction Test for backfilling sub-grade 2nd Layer (2 of 4) above the Sand cover fo
Inspection of Storm Water Line Pipe Installation 800mm dia (Connection to the existing culvert SBC-0
Inspection of Formwork for the Footing of SBC-09 - Wing Wall (As Highlighted)
Inspection of Concrete Pouring for the Footing of SBC-09 - Wing Wall (As Highlighted)
Inspection of Formwork for the Wall and Slab of Extension Area of SBC-05 - (As Highlighted).
Steel Reinforcement for Footings of Boundary wall Span 50B, 51, 52, 53, 54 & 55, As per Attached Hig
Concrete Pouring & Shuttering for Wall (200mm thk. Inner Wall) at Grid (A/2-20) @ Butterfly Garden,
Coordinates & Levels for Wall (200mm thk. Inner Wall) at Grid (A/2-20) @ Butterfly Garden, as highli
Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Grade) (Out of 4 layers), at Center, Inside
Installation of straight UPVC Conduit (Dia. 25mm) and Box for Fire Alarm (Speaker) at the Infill Wall
Installation of straight UPVC Conduit (2x110mm) for Low Current (Fire & Security) Ductbank no. B
Installation of straight UPVC Conduit (4x110mm) for Low Current (Telecommunication) Ductbank no
Surface Preparation Prior to start Backfilling at Strip footing & PC between PC 131-133 Zone 2F (as highl
Installation of straight UPVC conduit (4x160mm) for Medium Voltage Ductbank no. F/RC-MV/3 (Manh
Inspection of alignment for installed baseplates in Crescent 02 zone 4, 2J outer
Installation and Survey Report for Location and Levels of Anchor Bolts for RING BEAM Zone 1C (INNER) A
Inspection of alignment for installated baseplate in crescent 2 Zone 2K outer (as per attached)
Level and Location for CHILDCARE foundation P1, P1A, P5 Zone 2N (as highlighted)
Level and Location for MCPE 3 Slab inner at axis 03-1 to 03-2, 02S Zone 2E 2F (as highlighted)
Level and Location for Infill Wall Between BII BIV 25-26 (only 2 INNER) as highlighted Zone 1G between
Level and Location for RING BEAM Zone 1C (INNER) Axis 01-1, 01G to 01J (as highlighted)
Shuttering for CHILDCARE foundation P1, P1A, P5 Zone 2N (as highlighted)
Grouting of Installed Anchor bolt and under Baseplate at Zone 2M inner ring beam (as highlighted) usi
Grouting of Installed Anchor bolt and under Baseplate at Zone 2M inner ring beam (as highlighted) usi
Steel Reinforcements for MCPE 3 WALL inner at axis 02S to 02R, 03-1 Zone 2E 2F (as highlighted)
Steel Reinforcements for MCPE 3 Slab inner at axis 03-1 to 03-2, 02S Zone 2E 2F (as highlighted)
Shuttering for MCPE 3 Slab inner at axis 03-1 to 03-2, 02S Zone 2E 2F (as highlighted)
Concreting for MCPE 3 Slab inner at axis 03-1 to 03-2, 02S Zone 2E 2F (as highlighted)
Shuttering for Infill Wall Between BII BIV 25-26 (only 2 INNER) as highlighted Zone 1G between Gridline
Steel Reinforcements & Shear Connector for RING BEAM Zone 1C (INNER) Axis 01-1, 01G to 01J (as highl
Shuttering and Scaffolding for RING BEAM Zone 1C (INNER) Axis 01-1, 01G to 01J (as highlighted)
Inspection and compaction test 11th layer for backfilling of MCPE 1 (as highlighted) Zone 2M 2N (11th
Inspection and compaction test 5th layer for backfilling LARGE MOSQUE (as Highlighted) Zone 1G (5th of
Inspection and compaction test 4th layer for backfilling LARGE MOSQUE (as Highlighted) Zone 1G (4th of
Inspection and compaction test 11th layer for backfilling of MCPE 1 axis 03-S to 03-R (as highlighted)
Inspection and compaction test 7th layer for backfilling of Strip Footing and PC between PC 150-152 (7t
Protection layer of 4mm thick bituminous protection board for MCPE 2 Wall axis 03-2, 02X to 03E, 03E,
Surface Preparation and base primer coating for Wall (inner 2nd part) upto SOG of Large Mosque (as hi
Protection layer of 4mm thick bituminous protection board for RC Strip footing between PC 131-133 Zon
Steel Reinforcements for BUTTRESS BII BIV 50, 51 Zone 1M 1N (as highlighted)
Steel Reinforcements for BUTTRESS BOI BOV BII BIV 48 Zone 1M (as highlighted)
'Potable Water Pipes Sand Cover & Pipes Protection (30 cm above Pipes). As per highlighted Area in
Installation of Main Potable Water Pipes (50 & 200 &160 & 80mmØ-UPVC-Class-5) From Point (647430.
Installation of straight UPVC conduit (4x160mm) for Medium Voltage Ductbank no. BB/D-MV/02 (Ma
Installation of Rock and Boulder No. RB-318 - 1st layer (1 of 5)
Installation of Rock and Boulder No. RB-155 - 1st layer (1 of 4)
Excavation for Storm Water Line near SBC-01 - as highlighted in the attached drawing.
Inspection And Compaction Test of Backfilling Sub-grade 7th Layer (7 of 8) For Foul Water Line From F
"Inspection And Compaction Test of Backfilling Sub Grade Above Gravel 3rd Layer (3 of 3) around Man
Inspection And Compaction Test of Backfilling Sub Grade Above Warning Tape 1ST Layer (1 of 4) Fo
"Inspection And Compaction Test of Backfilling Sub Grade Above Gravel 1ST Layer (1 of 4) around M
Inspection of Backfilling Sub-grade 8th Layer (8 of 8) For Foul Water Line From FW-A-13 to FW-A-13-1
"Inspection of Backfilling Sub-grade 8th Layer (8 of 8) For Foul Water Line From FW-A-13-1 to FW-A-13
Inspection of Backfilling Sub-grade 8th Layer (8 of 8) For Foul Water Line From FW-A-13-3 to FW-A-13-4
"Inspection of Backfilling Sub-grade 5th Layer (5 of 8) For Foul Water Line From FW-A-13-2 to FW-A-13
Inspection and Compaction Test for backfilling 1st Layer (1 of 1) to cover the GreenTiles above the pip
Inspection and Compaction Test for backfilling 1st Layer (1 of 1) to cover the GreenTiles above the p
Inspection of Concrete (Plain) Pouring for Duct Bank of Fire & Security line between B/RC-FS/8 and B/R
Inspection of Concrete (Plain) Pouring for Duct Bank of Telecommunications line from B/TL/49 and B/TL
Inspection and Compaction Test for backfilling sub-grade 2nd Layer (2 of 4) above the Sand cover for F
Inspection and Compaction Test for backfilling sub-grade 4th Layer (4 of 4) above the Sand cover for Fi
Inspection and Compaction Test for backfilling sub-grade 2nd Layer (2 of 2) above the Sand cover for F
Inspection of Backfilling Gravel 1st Layer (1 of 3) around Manhole for MH-A-08, MH-A-11, MH-A-12 as H
Inspection of Concrete (Plain) Pouring for Duct Bank of Fire & Security line between B/FS/38 and B/RC-
Inspection of Reinforced Concrete Pouring for Duct Bank of Fire & Security line for B/RC-FS/18 at Zone-B
Inspection of Formwork for Duct Bank of Fire & Security line between B/FS/38 and B/RC-FS/18 at Zone-B
"Inspection of Steel Reinforcement for Duct Bank of Fire & Security line for B/RC-FS/18 at Zone-B - As
Inspection and Compaction Test for Backfilling Sub-base 1st Layer (1 of 1) under 3rd lift of Rock for Bou
Inspection and Compaction Test for Backfilling Subgrade 1st Layer (1 of 1) under 3rd lift of Rock for Bou
Inspection and Compaction Test for Backfilling Sub-base 1st Layer (1 of 1) under 3rd lift of Rock for Boul
Inspection and Compaction Test for Backfilling Subgrade 1st Layer (1 of 1) under 3rd lift of Rock for Bou
Inspection and Compaction Test for 1st Layer (1 of 1) Backfilling Sub-base under Boulder No. RB-156 (Sto
Inspection and Compaction Test for 1st Layer (1 of 1) Backfilling Sub-base under Boulder No. RB-144 (Sto
Soil Preparation under Boulder No. RB- 156
Inspection of Sand Covering Layer for Protection of Fire & Security Distribution Line from (K/FS/22 to
Inspection of Sand Covering Layer for Protection of Telecommunications Line from (K/TL/12 to K/TL/13)
Inspection of Concrete (Plain) Pouring for Duct Bank of Telecommunications line between B/TL/39 and
Inspection of Reinforced Concrete Pouring for Duct Bank of Telecommunications line for B/RC-TL/40 at
Inspection of Formwork for Duct Bank of Telecommunications line between B/TL/39 and B/RC-TL/02 at
Inspection of Steel Reinforcement for Duct Bank of Telecommunications line for B/RC-TL/40 at Zone-B -
Soil Preparation Prior to Backfilling Surround Pargola Footings (6 no's), at Grid (G&P/3, 4 & 5), (at
Concrete Pouring & Shuttering for Starter (Kicker) for Wall of New Ticketing Booth # 7A, at highlighte
Coordinates & Levels of Starter (Kicker) for Wall of New Ticketing Booth # 7A, at highlighted area in
Inspection & Compaction tests of 4th Layer Backfilling (Sub-Grade) (Out of 5 layers and single laye
Inspection and compaction test 2nd layer for backfilling of Strip Footing and PC between PC 32,34 (2nd
Inspection and compaction test 1st layer for backfilling of TUNNEL 1 (between axis 02-1 & 02-2) as high
Inspection and compaction test 1st layer for MCPE 2 Zone 2G 2H 2J 2K axis ( 1-1 to E ) (as highlighted)
Inspection and compaction test 10th layer for backfilling of MCPE 1 (as highlighted) Zone 2M 2N (10th
Inspection and compaction test 10th layer for backfilling of MCPE 1 axis 03-S to 03-R (as highlighted)
Inspection and compaction test 5th layer for backfilling of Strip Footing and PC between PC 150-152 (5t
Inspection and compaction test 6th layer for backfilling of Strip Footing and PC between PC 150-152 (6t
Level and Location for Infill Wall Between BOI 126-127 (OUTER) as highlighted Zone 2R between Gridlin
Level and Location for Strip Footing between PC 81-83 Zone 1N (as highlighted)
Concreting for Strip Footing Wall (upto SOG only) for Large Mosque ZONE 1G (as highlighetd)
Shuttering & Shear Connector for Infill Wall Between BOI 126-127 (OUTER) as highlighted Zone 2R betw
Concreting for Infill Wall Between BOI 126-127 (OUTER) as highlighted Zone 2R between Gridline 02-2/
Steel Reinforcements for Strip Footing between PC 81-83 Zone 1N (as highlighted)
Shuttering for Strip Footing between PC 81-83 Zone 1N (as highlighted)
Concreting for RING BEAM Zone 1D (Outer) Axis 01-2, 01J to 01M (as highlighted)
Concreting for RING BEAM Zone 1D (INNER) Axis 01-1, 01J to 01M (as highlighted)
Single layer of 4mm thick modified bituminous waterproofing membrane for RC Strip footing between P
Inspection of Alignment for installed Baseplates in Crescent 02 Zone 7, 2B outer
Level and Location for Excavation of CHILD CARE foundation (as highlighted)
Two coats of bituminous waterproofing coating for Wall (inner) upto SOG of Large Mosque (as highligh
Protection layer of 4mm thick bituminous protection board for Wall (inner) upto SOG of Large Mosque (
Grouting of Installed Anchor bolt and under Baseplate at Zone 2N inner ring beam (as highlighted) usin
Grouting of Installed Anchor bolt and under Baseplate at Zone 2N inner ring beam (as highlighted) usi
Grouting of Installed Anchor bolt and under Baseplate at Zone 2B inner ring beam (as highlighted) usin
Grouting of Installed Anchor bolt and under Baseplate at Zone 2B inner ring beam (as highlighted) usin
Survey for MCPE 4 Foundation at axis 01AP Zone 1N (as highlighted)
Shuttering for MCPE 4 Foundation at axis 01AP Zone 1N (as highlighted)
Steel Reinforcements for MCPE 4 Foundation at axis 01AP Zone 1N (as highlighted)
Pre Assembly alignment inspection of Crescent 02, Zone 2 - 2Q (axis 02AZ, 02AY, 02 AX)
ERECTION OF MOCK-UP FOR ETFE SYSTEM
Installation and Survey Report for Location and Levels of Anchor Bolts for RING BEAM Zone 1D (INNER) A
Installation of straight UPVC Duct Bank (Dia 6 inch) Mediam Voltage (4X160mm) DB no. (FF/D-MV/0
'Fire Fighting Networks Sand Cover & Pipes Protection (30 cm above Pipes). As per highlighted Area
'Warning Tape Installation of Fire Fighting Networks for (160, 200 & 250mmØ-UPVC-Class-5). As per
Installation of straight UPVC conduit (4x160mm) for Medium Voltage Ductbank no. GG/D-MV/25 (M
Stack Boulders Installed Layer at level +873.60, along Open Channel (Geyser garden Side), (Part 1), a
Concrete Pouring for Blinding under Boundary wall Span 50B, 51, 52, 53, 54 & 55, As per Attached Hi
Inspection & Compaction tests after Excavation for Foundation of Boundary wall Span 50B, 51, 52, 53
Sand Cover & Pipes Protection for Water Feature Lines (110mmØ CLASS-PE100) from centre to outside,
Concrete Pouring for Blinding under Electrical Handholes of Low Voltage (MH/SG/LV/07-12), Emerge
Inspection of Spatter Dash (Rough Coat) Prior to Plastering of walls Inside Showers (GF-5057) at Gri
Block work upto 6 layers for all walls, Inside Site Tower 2, as per the highlighted attached Drawings.
Protection layer 4mm thk. Bituminous Protection board for Waterproofing on Footing & Kicker of (Existi
2nd Coat Bituminous Damp proofing for Footing & Kicker of (Existing) Boundary wall (Outer Side), at El
1st Coat Bituminous Damp proofing for Footing & Kicker of (Existing) Boundary wall (Outer Side), at Ele
Plaster Guide Points & Accessories for Plastering of walls Inside Showers (GF-5057) at Grid between
Stack Boulders Installed Layers at Levels +879.50, +880.00 & +880.50, at Right Side of Mist Garden (Pa
Stack Boulders Installed layer at Level +879.00, (Part 4) Between Water Play Garden & Boundary wall
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 5 layers) Surround the Ma
Inspection & Compaction tests after Excavation for Sub surface Drainage pipe Lines (110mm Pipes) alo
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 4 layers), at Center, Insid
Inspection and Compaction Test for Backfilling Sub-base 1st Layer (1 of 1) under 2nd lift of Rock for Bo
Inspection and Compaction Test for Backfilling Subgrade 1st Layer (1 of 1) under 2nd lift of Rock for Bo
Inspection and Compaction Test for Backfilling Sub-base 1st Layer (1 of 1) under 2nd lift of Rock for Bo
Inspection and Compaction Test for Backfilling Subgrade 1st Layer (1 of 1) under 2nd lift of Rock for Bo
Inspection And Compaction Test of Backfilling Sub-grade 6th Layer (6 of 8) For Foul Water Line From F
"Inspection And Compaction Test of Backfilling Sub Grade Above Gravel 2nd Layer (2 of 3) around Man
Inspection of Backfilling Gravel 1ST Layer (1 of 1) around Manhole MH-M-12, MH-M-13 As Highlighted
"Inspection for Installation Of Isolation Fire Water Line Pit F/F/04, G/F/18 as highlighted "
Inspection of Sand Covering Layer for Protection of MV Line from (F/MV/11 to F/MV/04 and G/MV/01 t
Inspection of Sand Bedding under pipe for Fire & Security Distribution Line from (B/FS/14 to B/FS/15)
Inspection of Sand bedding under pipe for Telecommunication Line from (B/TL/10 to B/TL/12) at Zone-B
"Soil Preparation prior to start backfilling around Manhole for FW5, FW6, FW7, FW8 - as highlighted.
Inspection of Backfilling Sub-grade above Gravel 2nd Layer (2 of 2) around the Manhole for MH-D-07 - a
Inspection for Laying of GreenTiles above the pipe for Fire & Security Distribution Line from K/FS/02 to
Inspection for Laying of Green Tiles above the pipe for Telecommunication Line from K/TL/02 to K/TL/21
Inspection and Compaction Test for backfilling sub-grade 3rd Layer (3 of 3) above the Sand cover for Fi
Inspection and Compaction Test for backfilling 1st Layer (1 of 1) to cover the GreenTiles above the p
Inspection and Compaction Test for backfilling 1st Layer (1 of 1) to cover the GreenTiles above the pip
Inspection and Compaction Test for 1st Layer (1 of 1) Backfilling under Boulder No. RB-144 (Stock Pile #
Pre-Assembly bolt tightening inspection for aviary garden from grid line 1 to 17 ( as per higlighted ar
Pre Assembly bolt tightening inspection of Crescent 02, Zone 2 & 3 - 2P, 2Q, 2N (as highlighted area
Surface Preparation Prior to start Backfilling for TUNNEL 1 (between axis 02-1 & 02-2) as highlighted
Surface Preparation Prior to start Backfilling at MCPE 2 Zone 2G 2H 2J 2K axis ( 1-1 to E ) (as highlighted)
Surface Preparation Prior to start Backfilling at Strip footing & PC between PC 93,95,97 Zone 2A (as hig
Inspection and compaction test 9th layer for backfilling of MCPE 1 (as highlighted) Zone 2M 2N (9th of
Inspection and compaction test 9th layer for backfilling of MCPE 1 (as highlighted) Zone 2M 2N (9th of
Inspection and compaction test 4th layer for backfilling of Strip Footing and PC between PC 150-152 (4t
Inspection and compaction test 1st layer for backfilling of Strip Footing and PC between PC 32,34 (1st
Inspection and compaction test 1st layer for backfilling of Strip Footing and PC between PC 93,95,97 (1
Level and Location for BUTTRESS BIV 29, 30, 31, 32 Zone 1G 1H (as highlighted)
Level and Location for RING BEAM Zone 1D (INNER) Axis 01-1, 01J to 01M (as highlighted)
Level and Location for Rock level for CHILD CARE foundation (as highlighted)
Level and Location for Mass Concrete, Blinding of CHILDCARE foundation Zone 2N (as highlighted)
Single layer of 4mm thick modified bituminous waterproofing membrane under Strip footing between P
Geotextile and Screed under Strip footing between PC 22-24-26 Zone 1D (as Highlighted)
Shuttering and Shear Connectors for BUTTRESS BIV 29, 30, 31, 32 Zone 1G 1H (as highlighted)
Concreting for BUTTRESS BIV 29, 30, 31, 32 Zone 1G 1H (as highlighted)
Shuttering and Scaffolding for RING BEAM Zone 1D (INNER) Axis 01-1, 01J to 01M (as highlighted)
Steel Reinforcements for RING BEAM Zone 1D (INNER) Axis 01-1, 01J to 01M (as highlighted)
Concreting of middle Wall for Tunnel 1 (as Highlighted) Zone 2H
Shuttering of middle Wall for Tunnel 1 (as Highlighted) Zone 2H
Steel Reinforcements and Steel implant of missing T16 for Infill Wall Between BI 91-92 (Inner) as high
Surface Preparation and Solvent base primer for RC Strip footing between PC 140-142-144 Zone 2H (as
Single layer of 4mm thick modified bituminous water proofing membrane for RC Strip footing between
Protection layer of 4mm thick bituminous protection board for RC Strip footing between PC 140-142-14
Surface preparation and solvent base primer under Strip footing between PC 22-24-26 Zone 1D (as High
Weld Visual & NDT Inspection of Crescent 02 Zone 2 - 2P & 2Q (Axis 02AU, 02AV & 02AW)
Two layers of 4mm thick modified bituminous waterproofing membrane for MCPE 2 Wall axis 03-2, 02X t
Anti Termite application under Mass Concrete, Blinding of CHILDCARE foundation Zone 2N (as highlight
Installation of straight UPVC conduit (Dia.110mm-wall sleeve) for Low Current (ICT Cables, fIRE and
Shuttering of Mass Concrete, Blinding of CHILDCARE foundation Zone 2N (as highlighted)
Stack Boulders Installed layers (Remaining) at Step 1, 2, 3 & 4, at levels +875.45, +875.85, +876.25
Stack Boulders Installed layer at Level +878.50, (Part 4) Between Water Play Garden & Boundary wall
Inspection of Installed Electrical Handholes of Low Voltage (MH/ZG/LV/6, 10 & 11), Emergency (MH
Coordinates & Levels of Blinding under Boundary wall Span 50B, 51, 52, 53, 54 & 55, As per Attached
Inspection of Stone Coping on Walls of Plant Room @ Discovery Garden, At highlighted area in attac
Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Grade) (Out of 6 layers), along the Footin
Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Grade) (Out of 6 layers) Between 2 Strai
Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Grade) (Out of 5 layers and single laye
Excavation & Soil preparation for Foundation of Boundary wall Span 50B, 51, 52, 53, 54 & 55, As per
Stack Boulders Installed Layers at levels +876.50 & +877.08, along Open Channel, (Part 1), at Wadi #
Stack Boulders Installed layers (Remaining) at Step 1 & 2, at levels +875.15 & +875.55, Left side of
Stack Boulders Installed layer (Remaining) at Step 5, at levels +877.50, Left side of Geyser Garden, a
Stack Boulders Installed Layer upto Level +882.50, along the Boundary wall span 29 & 30 from Insid
Stack Boulders Installed Layers at levels +872.80 & +873.20, along Open Channel (Geyser garden Side)
Stack Boulders Installed layers at Levels +878.00, +881.50, +882.00 & 882.50, (Part 4) along Boundar
Stack Boulders Installed layer at Level +877.47, Between Geyser Garden & Boundary wall (at span 15
Stack Boulders Installed Layers at Levels +880.00 & +880.50, at Top & Right Side of Mist Garden (Part
Inspection and compaction test 3rd layer for backfilling of Strip Footing and PC between PC 150-152 (3r
Inspection and compaction test 8th layer for backfilling of MCPE 1 (as highlighted) Zone 2M 2N (8th of
Inspection and compaction test 2nd layer for backfilling of Strip Footing and PC between PC 150-152 (2n
Inspection And Compaction Test of Backfilling Sub-grade 5th Layer (5 of 8) For Foul Water Line From F
Inspection and compaction test 6th layer for MCPE 2 Zone 2G 2H 2J 2K axis ( AF to AB ) (as highlighted)
"Inspection And Compaction Test of Backfilling Sub Grade Above Gravel 1st Layer (1 of 3) around Man
Inspection and compaction test 6th layer for MCPE 2 Axis 03-2, 02AH to AF Zone 2K (as highlighted) (6t
Inspection of Sand Bedding under pipe for Fire & Security Distribution Line from (B/FS/15 to B/FS/06)
Surface Preparation Prior to start Backfilling at Strip footing & PC between PC 32-34 Zone 1F (as highlig
Inspection of Sand bedding under pipe for Telecommunication Line from (B/TL/12 to C/TL/14) at Zone-
Inspection and compaction test 5th layer for Strip footing & PC between PC 127-129 Zone 2F (as highlig
Inspection and Compaction Test for backfilling 1st Layer (1 of 1) to cover the GreenTiles above the pip
Inspection and compaction test 5th layer for Strip footing & PC between PC (94,96,98 ) Zone 2A (as highl
Surface Preparation Prior to Start Backfilling Gravel For Manholes MH-M-12, MH-M-13, MH-M-15 - AS H
Inspection of alignment for installed baseplates in Crescent 02 Zone 3, 2M outer
Inspection for casting concrete for short piece and Surface Preperation prior to start waterproofing
Inspection and Compaction Test for backfilling 1st Layer (1 of 1) to cover the GreenTiles beside & ab
Surface Preparation Prior to Start Backfill Gravel for Manhole MH-A-08, MH-A-11, MH-A-12 as Highlight
Installation and Survey Report for Location and Levels of Anchor Bolts for RING BEAM Zone 1D (OUTER)
Level and Location for Infill Wall Between BI 91-92 (Inner) as highlighted Zone 2H between Gridline 02-
Inspection of Steel Reinforcement for the Wing Walls and Wall and Slab of Extension Area of SBC-05 - (A
Level and Location for BUTTRESS BOI 26, 27, 28 (with beam) Zone 1G
Inspection and Compaction Test for backfilling sub-grade 1st Layer (1 of 4) above the Sand cover forP
Level and Location for Mass Concrete of Strip Footing Between (2nd layer) PC 79-81 Zone 1N (as highlig
Steel Reinforcements for MCPE 3 Columns (c9 - c10 - c11 - c12 - c13 - c14 - c15 - c16) at Ground Floor a
Inspection and Compaction Test for backfilling sub-grade 4th Layer (4 of 4) above the Sand cover for Fi
Inspection of Backfilling Sub-grade above Gravel 1st Layer (1 of 2) around the Manhole for MH-D-07 - a
Soil Preparation under Boulder No. RB- 144 - after cutting
Concreting for Infill Wall Between BI 91-92 (Inner) as highlighted Zone 2H between Gridline 02-1/Z- 02-
Inspection and Compaction Test for backfilling 1st Layer (1 of 1) to cover the GreenTiles beside & ab
Shuttering and Shear Connectors for BUTTRESS BOI 26, 27, 28 (with beam) Zone 1G
Notification to Start Cut and Fill upto (-20cm) from the finishing level in the crescent wadi garden as h
Concreting for BUTTRESS BOI 26, 27, 28 (with beam) Zone 1G
Shuttering & shear Connector above for Infill Wall Between BI 91-92 (Inner) as highlighted Zone 2H be
Geotextile sheet & Screed Protection under Strip footing between PC 80-82-84, 81-83 Zone 1N (as Highl
Steel Reinforcements for MCPE 3 Wall inner at Axis 02R to 02Q, 03-1 Zone 2E 2F (as highlighted)
Shuttering for Mass Concrete of Strip Footing Between (2nd layer) PC 79-81 Zone 1N (as highlighted)
Installation of UPVC conduit (4x110mm) for Low Current TELECOM Ductbank DB no.BG/D-TL/03 (MH no
Installation of UPVC conduit (2x110mm) for Low Current Fire and Security Ductbank DB no.BG/D-FS/
Inspection & Compaction tests after Excavation for Electrical Handholes of Emergency (MH/ZG/EM/0
Inspection & Compaction tests after Excavation for Electrical Handholes of Low Voltage (MH/SG/LV
Excavation & Blinding Levels of Electrical Handholes of Low Voltage (MH/SG/LV/07-12), Emergency (
Excavation & Bed Preparation for Water Feature Line (Part 1) (HDPE 300mm Main line & 3 Sub lines o
Steel Reinforcement for Wall (200mm thk. Inner Wall) at Grid (A/2-20 & 14/A-B) @ Butterfly Garden,
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 6 layers) Between 2 Strai
First layer Block work Layout for all walls, Inside Site Tower 2, as per the highlighted attached Drawin
Inspection & Compaction tests of 6th Layer Backfilling (Sub-Grade) (Out of 7 layers) along the Walls (O
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 6 layers), along the Footin
Stack Boulders Installed layers at Levels +876.65 & +877.07, Between Geyser Garden & Boundary wall
Concrete Pouring & Shutteirng for Wall (200mm thk. Outer Wall) at Grid (A/1-21) @ Butterfly Garden,
Coordinates & Levels for Wall (200mm thk. Outer Wall) at Grid (A/1-21) @ Butterfly Garden, as highli
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 4 layers), at Center, Inside
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 5 layers and single laye
Inspection and compaction test 4th layer for backfilling of MCPE 1 (as highlighted) Zone 2M 2N (4th of
Inspection and compaction test 6th layer for backfilling of MCPE 1 (as highlighted) Zone 2M 2N (6th of
Inspection and compaction test 5th layer for backfilling of MCPE 1 (as highlighted) Zone 2M 2N (5th of
Inspection for Sand bedding under pipe for MV Line from G/MV/25 TO G/MV/18 at Zone - G - as highlig
Inspection and compaction test 7th layer for backfilling of MCPE 1 (as highlighted) Zone 2M 2N (7th of
Inspection And Compaction Test of Backfilling Sub-grade 4th Layer (4 of 8) For Foul Water Line From F
Inspection of Backfilling Gravel 3rd Layer (3 of 3) around Manhole FW-A-15 - As Highlighted (SP#118)
Inspection and compaction test 7th layer for backfilling of MCPE 1 (as highlighted) Zone 2M 2N (7th of
Inspection And Compaction Test of Backfilling Sub-grade 8th Layer (8 of 8) For Foul Water Line From F
Inspection and compaction test 2nd layer for backfilling of MCPE 1 (as highlighted) Zone 2M 2N (2nd of
Inspection of Backfilling Gravel 5th Layer (5 of 5) around Manhole FW-A-14 - As Highlighted (SP#118)
Inspection And Compaction Test of Backfilling Sub-grade 8th Layer (8 of 8) For Foul Water Line From
Inspection And Compaction Test of Backfilling Sub-grade 8th Layer (8 of 8) For Foul Water Line From
Inspection And Compaction Test of Backfilling Sub-grade 8th Layer (8 of 8) For Foul Water Line From
Inspection and compaction test 3rd layer for backfilling of MCPE 1 (as highlighted) Zone 2M 2N (3rd of
Inspection And Compaction Test of Backfilling Sub-grade 8th Layer (8 of 8) For Foul Water Line From
Surface Preparation Prior to start Backfilling at Strip footing & PC between PC 150-152 Zone 2J (as highl
"Inspection and Compaction Test for Backfilling Sub-base under Boulder No. RB-318 (Stock Pile # 110 A-
Inspection And Compaction Test of Backfilling Sub-grade 7th Layer (7 of 8) For Foul Water Line From
Inspection and compaction test 1st layer for backfilling of Strip Footing and PC between PC 150-152 (1st
Inspection And Compaction Test of Backfilling Sub-grade 5th Layer (5 of 8) For Foul Water Line From F
Level and Location for RING BEAM Zone 1D (Outer) Axis 01-2, 01J to 01M (as highlighted)
INSPECTION FOR INSTALLATION OF ALL RINGS (RISER) FOR MH-M-07, MH-M-08, MH-M-09, MH-M-10 (As
"Inspection For Manhole Base Installation And UPVC Pipe Connection For MH-M-07, MH-M-08, MH-M-09
Level and Location for BUTTRESS BOV 29, 30, 31, 32 Zone 1G 1H
Inspection of Concrete (Plain) Pouring for Duct Bank of Fire & Security line between G/RC-FS/27 and G/
Inspection of Reinforced Concrete Pouring for Duct Bank of Fire & Security line for G/RC-FS/27 and G/R
Level and Location for MCPE 3 WALL at axis 02S to 02R, 03-1 to 03-2 Zone 2E 2F (as highlighted)
Inspection of Formwork for Duct Bank of Fire & Security line from G/RC-FS/27 to G/RC-FS/11 at Zone-G
Level and Location for RING BEAM Zone 1B (Outer) Axis 01-2, 01D to 01G (as highlighted)
"Inspection of Steel Reinforcement for Duct Bank of Fire & Security line for G/RC-FS/27 and G/RC-FS/11
Inspection of Concrete (Plain) Pouring for Duct Bank of Telecommunications line between G/RC-TL/3 an
Weld Visual & NDT Inspection of Crescent 02 Zone 2 - 2Q (Axis 02AX, 02AY & 02AZ)
Inspection of Reinforced Concrete Pouring for Duct Bank of Telecommunications line for G/RC-TL/3 and
Inspection of Formwork for Duct Bank of Telecommunications line from G/RC-TL/3 to G/RC-TL/2 at Zone
Installation and Survey Report for Location and Levels of Anchor Bolts for RING BEAM Zone 1B (Outer) A
Inspection of Steel Reinforcement for Duct Bank of Telecommunications line for G/RC-TL/3 and G/RC-TL
Inspection of Sand bedding under pipe for Fire & Security Distribution Line from G/FS/15 to G/FS/12 at
Surface Preparation and Solvent Base Primer for RC Strip footing between PC 131-133 Zone 2F (as Highl
Inspection of Sand Bedding under pipe for Telecommunication Line from G/TL/11 to G/TL/14 at Zone-G
Inspection and Compaction Test for backfilling sub-grade 1st Layer (1 of 2) above the Sand cover for F
Shuttering for RING BEAM Zone 1D (Outer) Axis 01-2, 01J to 01M (as highlighted)
Steel Reinforcements for MCPE 1 WALL inner at axis 02AP to 03T, 03-1 to 03-2 Zone 2M 2N (as highligh
Steel Reinforcements for RING BEAM Zone 1D (Outer) Axis 01-2, 01J to 01M (as highlighted)
Concreting for BUTTRESS BOV 29, 30, 31, 32 Zone 1G 1H
Steel Reinforcements for BUTTRESS BOV 49, 50, 51 Zone 1N 1M (as highlighted)
Shuttering for MCPE 3 WALL at axis 02S to 02R, 03-1 to 03-2 Zone 2E 2F (as highlighted)
Concreting for MCPE 3 WALL at axis 02S to 02R, 03-1 to 03-2 Zone 2E 2F (as highlighted)
Steel Reinforcements for Tunnel 1 (2 outer) wall part-C (as Highlighted) Zone 2H
Single layer of 4mm thick modified bituminous waterproofing membrane under Strip footing between P
Shuttering and Shear Connector for BUTTRESS BOV 29, 30, 31, 32 Zone 1G 1H
Steel Reinforcements & (Shear Connector above infill wall) for RING BEAM Zone 1B (Outer) Axis 01-2, 0
Concreting for RING BEAM Zone 1B (Outer) Axis 01-2, 01D to 01G (as highlighted)
Shuttering and Scaffoldings for RING BEAM Zone 1B (Outer) Axis 01-2, 01D to 01G (as highlighted)
HDPE Pipe Installation of Water Features pipes; (110mmØ CLASS-PE100); As per High lighted Attach
Installation of Main Fire Water Pipes (250&315mmØ-UPVC-Class-5) From Point (647427.394 East & 271
Inspection And Compaction Test of Backfilling Sub-grade 3rd Layer (3 of 8) For Foul Water Line From F
Inspection of Backfilling Gravel 2nd Layer (2 of 3) around Manhole FW-A-15 - As Highlighted (SP#118)
Inspection And Compaction Test of Backfilling Sub-grade 7th Layer (7 of 8) For Foul Water Line From F
Inspection of Backfilling Gravel 4th Layer (4 of 4) around Manhole FW-A-14 - As Highlighted (SP#118)
Inspection of Concrete Pouring for the Expansion Joint of SBC-06 (As Highlighted)
Inspection of Concrete Pouring for the Footing of SBC-09 - Wing Wall (As Highlighted)
Inspection of Formwork for the Footing of SBC-09 - Wing Wall (As Highlighted)
Inspection of Steel Reinforcement for the Footing and Wing Walls of SBC-09 - (As Highlighted)
Soil Preparation under Boulder No. RB- 144 priior to start cutting
Inspection of Thrust Block for UPVC Pipe (250 mm Dia) for Fire Water Line at Zone- F&G - As Highlighte
Inspection and Compaction Test for 2ndLayer (2 of 2) Backfilling under Boulder No. RB-318 (Stock Pile #
Inspection and Compaction Test for 1st Layer (1 of 2) Backfilling under Boulder No. RB-318 (Stock Pile #
"Inspection and Compaction Test for Backfilling Sub-base under Boulder No. RB-155 (Stock Pile # 110 A-
Inspection for Laying of GreenTiles above the pipe for Fire & Security Distribution Line from K/FS/01 to
Inspection for Laying of Green Tiles above the pipe for Telecommunication Line from K/TL/01 to K/TL/02
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 1) above GreenTiles for Fire
Inspection and Compaction Test for backfilling Sub-grade 1st Layer (1 of 1) above Green Tiles for Tel
Inspection and Compcation Test for backfilling Sub-grade 1st Layer (1 of 1) above Red Tiles for MV Li
Inspection And Compaction Test of Backfilling Sub-grade 7th Layer (7 of 8) For Foul Water Line From F
Inspection And Compaction Test of Backfilling Sub-grade 7th Layer (7 of 8) For Foul Water Line From F
Inspection And Compaction Test of Backfilling Sub-grade 7th Layer (7 of 8) For Foul Water Line From F
Inspection And Compaction Test of Backfilling Sub-grade 7th Layer (7 of 8) For Foul Water Line From F
Inspection And Compaction Test of Backfilling Sub-grade 6th Layer (6 of 8) For Foul Water Line From F
Inspection And Compaction Test of Backfilling Sub-grade 4th Layer (4 of 8) For Foul Water Line From FW
"Inspection And Compaction Test of Backfilling Sub Grade (1 of 7) For Manholes FW-A-7, FW-A-8, FW-A
Installation of UPVC conduit (2x110mm & 2x75mm) for Low Current Fire and Security Ductbank (MICC/P
Installation of UPVC conduit (2x110mm & 3x75mm) for Low Current TELECOM Ductbank (ICT Cables B/TL/
Installation of straight UPVC Conduit (Dia.160mmx4) Medium Voltage Ductbank no. FF/D-MV/05 (Man
Installation of straight UPVC Conduit (Dia.160mmx4) Medium Voltage Ductbank no. GG/D-MV/27 (
Steel Reinforcement for Wall & Columns (From T.O.F to Base plate level) at Grid (B/7-21, A/20-21 an
Concrete Pouring & Shuttering for Columns (Upto height +876.51) & Walls (Upto height +876.66) at Gri
Coordinates & Levels for Columns (Upto height +876.51) & Walls (Upto height +876.66) at Grid (A/5-14
Excavation & Bed Preparation for Sub surface Drainage pipes (110mm Pipes) along the Boundary wall (I
Inspection and compaction test 4th layer for Strip footing & PC between PC (94,96,98 ) Zone 2A (as highl
Inspection and compaction test 5th layer for MCPE 2 Zone 2G 2H 2J 2K axis ( AF to AB ) (as highlighted)
Inspection and compaction test 4th layer for Strip footing & PC between PC 127-129 Zone 2F (as highlig
Level and Location for Strip Footing Wall (upto SOG only) for Large Mosque ZONE 1G (as highlighetd) betwe
Steel Reinforcements for MCPE 3 WALL (INNER) at axis 03A Zone 2E (as highlighted)
Surface Preparation and Solvent Base Primer under Strip footing between PC 80-82-84, 81-83 Zone 1N (
Shuttering for Strip Footing Wall (upto SOG only) for Large Mosque ZONE 1G (as highlighetd) between axis (
Concreting for RING BEAM Zone 1E (OUTER) Axis 01-2, 01M to 01P (as highlighted)
Concreting for RING BEAM Zone 1E (INNER) Axis 01-1, 01M to 01P (as highlighted)
Grouting of Installed Anchor bolt and under Baseplate at Zone 2C & 2D Outer ring beam (as highlighted
Steel Reinforcements for Infill Wall Between BII BIV 25-26 (INNER) as highlighted Zone 1G between Gridli
Surface Preparation and Solvent Base Primer for MCPE 3 Foundation (SIDE) (as Highlighted) ZONE 2E
Two layers of 4mm thick modified bituminous water proofing for MCPE 3 Foundation (SIDE) (as Highlig
Protection layer of 4mm thick bituminous protection board for MCPE 3 Foundation (SIDE) (as Highlight
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 5 layers and single layer
Installation and Fixation of Anchor Bolts and Check Coordinates & Levels for Columns (C6A, C7A, C8A,
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 6 layers), along the Footin
Surface Preparation Prior to Structural repair (with "LA extra") at External Elevations at Site Tower
Primer Coating Prior to Damp proofing for Footing & Kicker of (Existing) Boundary wall (Outer Side), at
Surface Preparation Prior to Water proofing for Footing & Kicker of (Existing) Boundary wall (Outer Sid
Block work Upto Lintel height for all walls Inside Public Toilet # 3, At highlighted area in attached Dra
Inspection And Compaction Test of Backfilling Sub-grade 2nd Layer (2 of 8) For Foul Water Line From
Inspection of 6 layers Block work for all walls Inside Public Toilet # 3, At highlighted area in attached
Inspection of Backfilling Gravel 1st Layer (1 of 3) around Manhole FW-A-15 - As Highlighted (SP#118)
Inspection And Compaction Test of Backfilling Sub-grade 6th Layer (6 of 8) For Foul Water Line From F
Inspection of Backfilling Gravel 3rd Layer (3 of 3) around Manhole FW-A-14 - As Highlighted (SP#118)
Inspection For Installation Of Slabs For (MH-M-15) (As Highlighted).
Inspection of Concrete (Plain) Pouring for Duct Bank of Telecommunications line near G/TL/31 at Zone-G
Inspection of Concrete (Plain) Pouring for Duct Bank of Fire & Security line near G/FS/18 at Zone-G - As
Inspection and Compaction Test for backfilling sub-grade 2nd Layer (2 of 3) above the Sand cover for Fi
Inspection and Compaction Test for backfilling sub-grade 3rd Layer (3 of 4) above the Sand cover for Fi
Inspection and Compaction Test for 2nd Layer (2 of 3) Backfilling under Boulder No. RB-155 (Stock Pile #
Inspection and Compaction Test for 1st Layer (1 of 3) Backfilling under Boulder No. RB-155 (Stock Pile #
INSPECTION FOR INSTALLATION OF ALL RINGS (RISER) FOR MH-M-12, MH-M-13, MH-M-15 (As Highlight
"Inspection For Manhole Base Installation And UPVC Pipe Connection For MH-M-12, MH-M-13, MH-M-15
"Inspection and Compaction Test for backfilling sub-grade 8th Layer (8 of 8) around SBC-01-Transition
"Inspection of Backfilling Gravel 3rd Layer (3 of 5) around the Manhole for MH-D-07 - as Highlighted (S
Inspection and Compaction Test for backfilling Sub-grade 1st Layer above Red Tiles for MV Line from
Soil Preparation under Boulder No. RB- 318
Excavation for Fire & Security Distribution Line from (B/FS/14 to B/FS/06) including Pit B/FS/14, B/FS/
Inspection of alignment for installated baseplate in crescent 2 Zone 7, 2B inner (as per attached)
Level and Location for Blinding of Retaining Wall of Zone 1D axis 01K to 01J (as highlighted)
Inspection and compaction test 3rd layer for Strip footing & PC between PC (94,96,98 ) Zone 2A (as high
Inspection and compaction test 3rd layer for Strip footing & PC between PC 127-129 Zone 2F (as highlig
Inspection and compaction test 4th layer for MCPE 2 Zone 2G 2H 2J 2K axis ( AF to AB ) (as highlighted)
Installation of stub-up UPVC Conduit (Dia. 25mm) for Voice and Data (WIFI) at the Buttress Axis (01/
Level and Location for BUTTRESS BOI 22, 23, 24, 25 (with beam) Zone 1F 1G
Level and Location for BUTTRESS BII 26, 27, 28 (with beam) Zone 1G
Installation of stub-up UPVC Conduit (Dia. 25mm) for Fire Alarm (Speaker) at the Buttress Axis (01/1
Shuttering and (Shear Connector above infill wall) for Infill Wall Between BI 87-88 (Inner) as highligh
Concreting for Infill Wall Between BI 87-88 (Inner) as highlighted Zone 2G between Gridline 02-1W - 02-
Steel Reinforcements for MCPE 1 COUNTER FORT WALL (INNER) at axis 03-1, 03T to 03S Zone 2M 2N (as
Shuttering for Blinding of Retaining Wall of Zone 1D axis 01K to 01J (as highlighted)
Concreting for Blinding of Retaining Wall of Zone 1D axis 01K to 01J (as highlighted)
Shuttering and Shear Connector for BUTTRESS BOI 22, 23, 24, 25 (with beam) Zone 1F 1G
Concreting for BUTTRESS BOI 22, 23, 24, 25 (with beam) Zone 1F 1G
Shuttering and Shear Connector for BUTTRESS BII 26, 27, 28 (with beam) Zone 1G
Concreting for BUTTRESS BII 26, 27, 28 (with beam) Zone 1G
Grouting of Installed Anchor bolt and under Baseplate at Zone 2P inner & outer ring beam (as highlight
Installation of straight UPVC Conduit (Dia. 25mm) and Box for Security (CAM) at the Buttress Axis (0
Installation of straight UPVC Conduit (Dia. 25mm) and Box for Fire Alarm (Speaker) at the Buttress Ax
Installation of straight UPVC Conduit (Dia. 25mm) and Box for Voice and Data (WIFI & CAM) at the But
First layer Block work Layout for all walls Inside Public Toilet # 1, At highlighted area in attached Draw
'Bedding of Gravel 3/8" and Geotextile surrounding in pipes ( 315 & 450 mm Ø- UPVC Pipes-Class 4 )
'Pipe Installation of Strom Water pipe OUT FALL-M for (315 & 450 mmØ-UPVC pipes-Class 4) from (
'Fire Fighting Networks Sand Cover & Pipes Protection (30 cm above Pipes). As per highlighted Area
'Fire Fighting Networks Sand Cover & Pipes Protection (30 cm above Pipes). As per highlighted Area
Inspection of Sand bedding under pipe for Fire & Security Distribution Line from K/FS/13 to K/FS/12 at
Inspection of Sand Bedding under pipe for Telecommunication Line from K/TL/21 to K/TL/06 at Zone-K a
Inspection of Sand Bedding under pipe for Telecommunication Line between B/TL/32 to G/TL/38 at Zo
Inspection of Sand Bedding under pipe for Fire & Security Distribution Line from B/FS/31 to G/FS/38 a
Inspection of Concrete (Plain) Pouring for Duct Bank of Fire & Security line between G/FS/18 to G/FS/33
Inspection of Reinforced Concrete Pouring for Duct Bank of Fire & Security line between G/FS/18 to G/F
Inspection of Formwork for Duct Bank of Fire & Security line between G/FS/18 to G/FS/33 at Zone-G - A
Inspection of Steel Reinforcement for Duct Bank of Fire & Security line between G/FS/18 to G/FS/33 at
Inspection for Laying of GreenTiles above the pipe for Fire & Security Distribution Line from K/FS/22 to
Inspection for Laying of Green Tiles above the pipe for Telecommunication Line from K/TL/12 to K/TL/13
Inspection of Concrete (Plain) Pouring for Duct Bank of Telecommunications line between G/TL/31 to G
Inspection of Reinforced Concrete Pouring for Duct Bank of Telecommunications line between G/TL/31
Inspection of Formwork for Duct Bank of Telecommunications line between G/TL/31 to G/TL/29 at Zone-
Inspection of Steel Reinforcement for Duct Bank of Telecommunications line between G/TL/31 to G/TL/
Soil Preparation under Boulder No. RB- 155
Excavation for Fire & Security Distribution Line from G/FS/15 to G/FS/12, including Pit G/FS/15, G/FS/0
Excavation for Telecommunication Line between G/TL/11 to G/TL/14 including pit G/TL/11, G/TL/12, G/
Installation of straight UPVC Conduit (Dia. 32mm) for Power (Socket Outlet) at the Buttress Axis (01/
Inspection of Sand Covering Layer for protection of MV Line from G/MV/03 TO G/MV/05 at Zone-G - as h
"Surface Preparation Prior to Start Backfilling Gravel For Manholes And Gullies MH-H-01, MH-H-02,
Steel Reinforcement for Wall & Columns at Grid (A/1-2 & B/1-7) & (1&2/A-B) @ Butterfly Garden, at h
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 6 layers) Between 2 Strai
Installation of straight UPVC Conduit (Dia. 32mm) for Power (Socket Outlet) at the Buttress Axis (01/
Excavation for Telecommunication Line from (B/TL/10 to C/TL/14) including pit B/TL/10, B/TL/12, B/TL/
Installation of straight UPVC Conduit (Dia. 32mm) for Power (Socket Outlet) at the Buttress Axis (01/
Inspection and compaction test 2nd layer for Strip footing & PC between PC(94,96,98 ) Zone 2A (as high
Inspection and compaction test 3rd layer for MCPE 2 Zone 2G 2H 2J 2K axis ( AF to AB ) (as highlighted)
Inspection and compaction test 2nd layer for Strip footing & PC between PC 127-129 Zone 2F (as highlig
Steel Reinforcements for BUTTRESS BIV BII 36, 37, 38 Zone 1J
surface preparation & solvent base primer at side of foundation for MCPE 1 zone 2M 2N
Two layers of 4mm thick modified bituminous waterproofing-membrane at side of foundation for MC
Inspection and Compaction Test for backfilling sub-grade 1st Layer (1 of 3) above the Sand cover for Fi
Inspection for Laying of Red Tiles above the pipe for MV Line from G/MV/05 to G/MV/12 at Zone-G as h
Inspection for Laying of GreenTiles above the pipe for Fire & Security Distribution Line from G/FS/46 t
Inspection for Laying of Green Tiles above the pipe for Telecommunication Line from G/TL/45 to K/TL/0
Inspection and Compaction Test for backfilling sub-grade 2nd Layer (2 of 4) above the Sand cover for Fi
Inspection and Compaction Test for backfilling sub-grade 3rd Layer (3 of 4) above the Sand cover for Fi
"Inspection and Compaction Test for backfilling sub-grade 7th Layer (7 of 8) around SBC-01-Transition
"Inspection of Backfilling Gravel 2nd Layer (2 of 5) around the Manhole for MH-D-07 - as Highlighted (
Inspection for Casting Blinding Concrete under Manhole - MH-M-07, MH-M-08, MH-M-09, MH-M-10 - as
Inspection for Blinding Concrete under Fire & Security Line Pit B/FS/38, G/FS/16 at Zone-B&G - as highli
Inspection for Blinding Concrete under Telecommunication Line Pit B/TL/39, B/TL/40, B/TL/49, G/TL/33
Stack Boulders Installed layer (Remaining) at Step 3, at level +875.95, Left side of Geyser Garden, at
Inspection for Laying of Red Tiles above the pipe for MV Line from G/MV/13 to L/MV/08 at Zone-G,K&L
Stack Boulders Installed Layer upto Level +882.00, along the Boundary wall span 29 & 30 from Insid
Inspection and Compaction Test for backfilling 1st Layer (1 of 1) to cover the GreenTiles above the p
Inspection and Compaction Test for backfilling 1st Layer (1 of 1) to cover the GreenTiles above the pip
Stack Boulders Installed layers at Levels +877.50, +878.00, +878.50 & +879.00, (Small area) at 'Y' jun
Inspection and Compaction Test for backfilling 1st Layer (1 of 2) to cover the GreenTiles above the p
"Inspection of Sand Bedding under pipe for Fire Water Line branch at Zone-F as highlighted (SP # 67)"
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 5 layers), along the Boun
Inspection & Compaction tests of 8th (Final) Layer Backfilling (Sub-Grade) (Out of 8 layers) for 1 Curv
"Inspection of Sand Bedding under pipe for Potable Water Line branch at Zone-F as highlighted (SP # 67
"Inspection of Backfilling Gravel 2nd Layer (2 of 3) For Manholes And Gullies MH-G-02, MH-G-03, M
Grouting (with ConbExtra GP) for installed Baseplates at Grids (1-15/ Right & Left Sides) on Boundary
Inspection & Compaction tests of 6th Layer Backfilling (Sub-Grade) (Out of 8 layers) for 1 Curved Wall
1st Layer Gravel Backfilling Surround the Manholes (5 no's) (MH-D-03-02, 03-03, MH-D-03-04, MH-D-05
Stack Boulders Installed layer at Level +876.60, (Small area) for 2nd to 4th Lines at Left Side of Plan
Inspection of Sand Covering Layer for Protection of MV Line from (K/MV/01 to L/MV/08) at Zone-K&L as
Stack Boulders Installed Layers at levels +875.60 & +876.00, along Open Channel, (Part 1), at Wadi #
Inspection and Compaction Test for backfilling 2nd Layer (2 of 2) to cover the Green Tiles for Teleco
Stack Boulders Installed layers at Levels +880.50 & 881.00, (Part 4) along Boundary wall Span 36 & 3
"Inspection of Sand Bedding under pipe for Potable Water Line branch at Zone-F as highlighted (SP # 67
Inspection and compaction test 1st layer for Strip footing & PC between PC 127-129 Zone 2F (as highligh
Inspection and compaction test 8th layer for backfilling of Strip Footing and PC between PC 146-148-150
Inspection and compaction test 1st layer for Strip footing & PC between PC(94,96,98 ) Zone 2A (as highli
Inspection and compaction test 2nd layer for MCPE 2 Zone 2G 2H 2J 2K axis ( AF to AB ) (as highlighted)
Surface Preparation prior to statr backfilling at strip footing and PC between PC 127-129 Zone 2F (as
Installation and Survey Report for Location and Levels of Anchor Bolts for RING BEAM Zone 1E (INNER) A
Installation and Survey Report for Location and Levels of Anchor Bolts for RING BEAM Zone 1E (Outer) A
Level and Location for RING BEAM Zone 1E (INNER) Axis 01-1, 01M to 01P (as highlighted)
Level and Location for Mass Concrete (4th) of Strip Footing Between PC 150 - 152 Zone 2J
Level and Location for RETAINING WALL FOUNDATION Axis 01M to 01K ZONE 1D (as highlighetd)
Level and Location for Infill Wall (KICKER & UPSTAND) Between BI 86-87 (Inner) as highlighted Zone 2
Steel Reinforcements for RING BEAM Zone 1E (INNER) Axis 01-1, 01M to 01P (as highlighted)
Shuttering for RING BEAM Zone 1E (INNER) Axis 01-1, 01M to 01P (as highlighted)
Shuttering for Mass Concrete (4th) of Strip Footing Between PC 150 - 152 Zone 2J
Concreting for Mass Concrete (4th) of Strip Footing Between PC 150 - 152 Zone 2J
Two layers of 4mm thick modified bituminous waterproofing membrane for MCPE 2 Wall (as Highlighted
Surface Prerparation and Solvent Base Primer for MCPE 2 Wall axis 03-2, 02X to 03E, 03E, 03-2 to 03-1 (
Protection layer of 4mm thick bituminous protection board for Isolated Column of Large Mosque (as hi
Grouting of Installed Anchor bolt and under Baseplate at Zone 2N outer ring beam (as highlighted) usi
Grouting of Installed Anchor bolt and under Baseplate at Zone 2M Inner ring beam (as highlighted) usi
Grouting of Installed Anchor bolt and under Baseplate at Zone 2C & 2D Inner ring beam (as highlighted
Inspection of Sand Bedding under pipe for Telecommunication Line between G/TL/14 to G/TL/23 at Zone
Inspection of Sand Bedding under pipe for Fire & Security Distribution Line from G/FS/12 to G/FS/37 at
Inspection for Laying of Green Tiles above the pipe for Telecommunication Line from K/TL/09 to K/TL/1
Inspection for Laying of GreenTiles above the pipe for Fire & Security Distribution Line from K/FS/23 t
Inspection for Laying of Green Tiles above the pipe for Telecommunication Line from K/TL/09 to K/TL/10
"Inspection of Grouting (Vertical Joints) for Rock Boulder - RB-137 for All Layers"
"Inspection of Grouting (Horizontal Joints) for Rock Boulder - RB-134 for All Layers"
"Inspection of Grouting (Vertical Joints) for Rock Boulder - RB-134 for All Layers"
"Inspection of Grouting (Horizontal Joints) for Rock Boulder - RB-135 for All Layers"
"Inspection of Grouting (Vertical Joints) for Rock Boulder - RB-135 for All Layers"
"Inspection of Grouting (Horizontal Joints) for Rock Boulder - RB-136 for All Layers"
"Inspection of Grouting (Vertical Joints) for Rock Boulder - RB-136 for All Layers"
"Inspection of Grouting (Horizontal Joints) for Rock Boulder - RB-137 for All Layers"
Inspection of Concrete Pouring for the Foundation, Slab-on-Grade and Side Walls of SBC-05 - Wing Wall
Inspection of Formwork for the Foundation, Slab-on-Grade and Side Walls of SBC-05 - Wing Wall (As Hig
Inspection of Steel Reinforcement for the Foundation, Slab-on-Grade and Side Walls of SBC-05 - Wing Wa
Inspection of Sand Bedding under pipe for MV Line from B/MV/25 TO B/MV/02 at Zone-B - as highlighte
Inspection and compaction test 6th layer for backfilling of MCPE 1 (as highlighted) Zone 2M 2N (6th of
Inspection and compaction test 1st layer for MCPE 2 Zone 2G 2H 2J 2K axis ( AF to AB ) (as highlighted)
Inspection and compaction test 6th layer for backfilling of MCPE 1 (as highlighted) Zone 2M 2N (6th of
Inspection and compaction test 5th layer for MCPE 2 Axis 03-2, 02AH to AF Zone 2K (as highlighted) (5t
Inspection And Compaction Test of Backfilling Sub-grade Above Warning Tape 1st Layer (1 of 8) For F
Surface Preparation Prior to start Backfilling for Strip footing & PC between PC(94,96,98 ) Zone 2A (as h
Surface Preparation Prior to Start Backfilling Gravel For Manhole FW-A-15 - AS Highlighted
Inspection and compaction test 4th layer for backfilling of Strip Footing and PC between PC 140-142 (4t
Inspection for Sand bedding under pipe for MV Line from G/MV/18 TO G/MV/03 at Zone - G - as highlig
Surface Preparation Prior to start Backfilling at MCPE 2 Zone 2G 2H 2J 2K axis ( AF to AB ) (as highlighted
Inspection of Sand Covering Layer for Protection of Telecommunications Line from (F/TL/04 to G/TL/21)
Inspection of Sand Covering Layer for Protection of Fire & Security Distribution Line from (F/FS/04 to
Inspection and compaction test 4th layer for MCPE 2 Axis 03-2, 02AH to AF Zone 2K (as highlighted) (4t
Excavation for Fire & Security Distribution Line from K/FS/13 to K/FS/12, including Pit K/FS/13, K/FS/14
Excavation for Telecommunication Line between K/TL/21 to K/TL/06 including pit K/TL/21, K/TL/05, K/T
Inspection and compaction test 7th layer for backfilling of Strip Footing and PC between PC 146-148-150
Inspection of Sand Covering Layer for Protection of MV Line from (G/MV/25 to G/MV/28) at Zone-G - as
Excavation for Telecommunication Line between B/TL/32 to G/TL/38 including pit B/TL/32, G/TL/04, G
Excavation for Fire & Security Distribution Line from B/FS/31 to G/FS/38, including Pit B/FS/31, G/FS
"Inspection and Compaction Test for backfilling sub-grade 6th Layer (6 of 8) around SBC-01-Transition
Inspection and Compaction Test for backfilling 1st Layer (1 of 2) to cover the GreenTiles above the p
Inspection and Compaction Test for backfilling 1st Layer (1 of 2) to cover the GreenTiles above the pip
Inspection and Compaction Test for backfilling 1st Layer (1 of 1) to cover the GreenTiles above the p
Inspection and Compaction Test for backfilling 1st Layer (1 of 1) to cover the GreenTiles above the pip
Inspection for Laying of Green Tiles above the pipe for Telecommunication Line from K/TL/14 to K/TL/11
Inspection for Laying of GreenTiles above the pipe for Fire & Security Distribution Line from K/FS/23 to
Tent Mock up for Tickketing
Pipe Installation of Sub-Surface Drainage (Main Line & Branches) Pipes; (110 & 250 mmØ, UPVC-CLAS
Inspection for Installation of Electrical Handholes of Low Voltage (10 no's), (MH/ZG/LV/1-5 & 12-16)
Inspection for Installation of Electrical Handholes of Low voltage (MH/DG/LV/01-08), Telecom (MH
Sand Bedding for Water Feature Lines from centre to outside, beside Plant room, at Maze garden, as
Inspection & Compaction tests of Single Layer (Sub-Base) Backfilling Prior to Blinding Under Water F
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 6 layers) along the Bounda
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 6 layers) Surround the Foot
Stone Cladding on Block Walls (Outer Face) at Whispering Cave 2, From Inside Sound & Light Garden,
Stone Coping on Walls of Outer Canopy 3 and Both Side completed Remaining Stone Coping, at Physic
Stone Cladding for Walls (Inner Face) at Outer Canopy 2 and for Walls (Outer Face) from Inside the P
Soil Preparation Prior to Backfilling along the Footing (Inner Side), (at B.O.B level +875.26), at Grid
Protection Layer 4mm thk Bituminous Protection Board on Water Proofing on Footing Sides (Upto T.O.F
Soil preparation & Existing Levels prior to Backfilling, at Center, Inside Discovery Garden at highlight
Pre assembly bolt tightening inspection of Crescent 02, zone 2 - 2Q (axis 02AZ, 02AY, 02AX)
Pre-Assembly bolt tightening inspection for aviary garden from grid line 14 to 21 ( as per higlighted a
Inspection of Alignment of installed Baseplates in Aviary Garden from Grid line 02 to 15
Inspection of alignment for installated baseplate in crescent 2 Zone 7 2C outer (as per attached)
Level and Location for Mass Concrete of Strip Footing (2nd) Between PC 81-83, 80-82-84 Zone 1N (as hi
Level and Location for Strip Footing Wall (upto SOG only) for Large Mosque ZONE 1G (as highlighetd)
Level and Location for Strip Footing between PC 131 - 133 Zone 2F
Level and Location for BUTTRESS BOV 26, 27, 28 Zone 1G
Level and Location for 2 side Wall for Tunnel 1 (as Highlighted) Zone 2H
Level and Location for BUTTRESS BOI 59, 60 (2ND) Zone 2A
Level and Location for RING BEAM Zone 1E (OUTER) Axis 01-2, 01M to 01P (as highlighted)
Steel Reinforcements for RETAINING WALL FOUNDATION Axis 01M to 01K (as highlighted) Zone 1D
Shuttering for RETAINING WALL FOUNDATION Axis 01M to 01K (as highlighted) Zone 1D
Protection layer of 4mm thick bituminous protection board for RC Strip footing between PC 146-148-150
Single layer of 4mm thick modified bituminous waterproofing membrane for RC Strip footing between P
Shuttering for Mass Concrete of Strip Footing Between (2nd layer) PC 81-83, 80-82-84 Zone 1N (as highl
Steel Reinforcements for Strip Footing between PC 131 - 133 Zone 2F
Shuttering for Strip Footing between PC 131 - 133 Zone 2F
Concreting for Strip Footing between PC 131 - 133 Zone 2F
Protection layer of 4mm thick bituminous protection board for MCPE 2 outer wall axis 03-2, 02AH to 0
Shuttering and Shear Connectors for BUTTRESS BOV 26, 27, 28 Zone 1G
Concreting for BUTTRESS BOV 26, 27, 28 Zone 1G
Shuttering of 2 side Wall for Tunnel 1 (as Highlighted) Zone 2H
Installation of UPVC conduit sleeves (13x75mm) for LV Ductbank (Power, Normal & Emergency Lightin)
Installation of UPVC Conduit Sleeves (6x75mm) and Low Current Duct Bank (CAT6A & Spare) at Butter
Concreting of 2 side Wall for Tunnel 1 (as Highlighted) Zone 2H
Protection layer of 4mm thick bituminous protection board for MCPE 3 Wall and Foundation Axis 02S TO
Shuttering and Shear Connectors for BUTTRESS BOI 59, 60 (2ND) Zone 2A
Concreting for BUTTRESS BOI 59, 60 (2ND) Zone 2A
Two Coats of Bituminous waterproofing coating for Isolated Column of Large Mosque (as highlighted) Z
Steel Reinforcements for RING BEAM Zone 1E (OUTER) Axis 01-2, 01M to 01P (as highlighted)
Shuttering for RING BEAM Zone 1E (OUTER) Axis 01-2, 01M to 01P (as highlighted)
Installation of straight UPVC Conduit (Dia.32mm) for Power(Socket Outlet) at Crescent-01 (Buttress Axi
Installation of straight UPVC Conduit (Dia.32mm) for Power(Socket Outlet) at Crescent-01 (Buttress Axi
Installation of earthing clamps with conductor 70mm (1pc.) for earthing reinforcement steel re-bar at
Installation of straight UPVC Conduit (Dia.32mm) for Power(Socket Outlet) at Crescent-01 (Buttress Axi
Installation of straight UPVC Conduit (Dia.25mm) and Box for Security (CAM) at the Buttress Axis (01/1
Installation of straight UPVC Conduit (Dia.25mm) and Box for Voice and Data (WIFI &CAM) at the Buttre
Installation of straight UPVC Conduit (Dia.25mm) and Box for Fire Alarm (Speaker) at the Buttress Axis
Installation of straight UPVC Conduit (Dia.25mm) and Box for Voice and Data (WIFI) at the Buttress Ax
Installation of straight UPVC Conduit (Dia.25mm) and Box for Fire Alarm (Speaker) at the Buttress Axis
Inspection of Backfilling Gravel 1st Layer (1 of 3) For Manhole MH-G-06 - As Highlighted SP#118)
Inspection of Sand Covering Layer for Protection of Telecommunications Line from (K/TL/02 to K/TL/21)
Inspection of Sand Covering Layer for Protection of Fire & Security Distribution Line from (K/FS/02 to
Inspection of Backfilling Gravel 4th Layer (4 of 4) For Manholes FW-A-7, FW-A-8, FW-A-9, FW-A-10, FW
Inspection of Backfilling Sub-grade 6th Layer (6 of 8) For Foul Water Line From FW-A-9 to FW-A-8 - As
Inspection of Backfilling Sub-grade 6th Layer (6 of 8) For Foul Water Line From FW-A-10 to FW-A-9 - As
Inspection of Backfilling Sub-grade 6th Layer (6 of 8) For Foul Water Line From FW-A-11 to FW-A-10 - A
Inspection of Backfilling Sub-grade 6th Layer (6 of 8) For Foul Water Line From FW-A-12 to FW-A-11 - A
Inspection of Backfilling Sub-grade 5th Layer (5 of 8) For Foul Water Line From FW-A-8 to FW-A-7 - As
Inspection of Backfilling Sub-grade 3rd Layer (3 of 8) For Foul Water Line From FW-A-7 to FW-A-6 - As
Inspection of Backfilling Sub-grade 7th Layer (7 of 8) For Foul Water Line From FW-A-13-3 to FW-A-13-4
"Inspection of Backfilling Sub-grade 7th Layer (7 of 8) For Foul Water Line From FW-A-13-1 to FW-A-13
Inspection of Backfilling Sub-grade 7th Layer (7 of 8) For Foul Water Line From FW-A-13 to FW-A-13-1
"Inspection of Backfilling Sub-grade 4th Layer (4 of 8) For Foul Water Line From FW-A-13-2 to FW-A-13
Inspection of Backfilling Sub-grade 5th Layer (5 of 8) For Foul Water Line From FW-A-14 to FW-A-13 - A
Inspection of Sand Covering Layer for Protection of Fire & Security Distribution Line from (G/FS/38 to
Inspection of Sand Covering Layer for Protection of Telecommunications Line from (G/TL/38 to near G/
Inspection and Compaction Test for backfilling 1st Layer (1 of 2) beside Telecommunications Line from
Inspection and Compaction Test for backfilling 1st Layer (1 of 2) beside Fire & Security Distribution
Inspection and Compaction Test for Backfilling Sub-grade (above gravel) 1st Layer (1 of 5) For Manho
"Inspection for Casting Blinding Concrete under Manhole - MH-M-12, MH-M-13, MH-M-14, MH-M-15 - a
Inspection of Backfilling Gravel 2nd Layer (2 of 3) around Manhole FW-A-13-2, FW-A-14 - As Highlighted
Inspection for Rough Grading (Backfilling) upto (-40cm) from the Final Grading Level at Zone - F (Near R
Inspection and Compaction Test for backfilling sub-grade 1st Layer (1 of 4) above the Sand cover for Fi
Inspection and Compaction Test for backfilling sub-grade 2nd Layer (2 of 4) above the Sand cover for F
Inspection and Compaction Test for 4th Layer (4 of 4) backfilling (grading) at Zone - F (Near RB-244) as
"Inspection and Compaction Test for backfilling sub-grade 5th Layer (5 of 8) around SBC-01-Transition
Installation of Anchor Bolts and Check Co-ordinates and Levels for Canopy Foundation for Seating Area-1
Stack Boulders Installed layer at Level +878.17, at 1st line of 'L' shape boulders & Remaining part,
Stack Boulders Installed Layer upto Level +881.50, along the Boundary wall span 29 & 30 from Insid
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 5 layers), along the Boun
Concrete Pouring & Shuttering for Footings of Internal foundations, Inside Butterfly Garden, at highl
Coordinates & Levels of Footings for Internal foundations, Inside Butterfly Garden, at highlighted are
Steel Reinforcement for Footings of Internal foundations, Inside Butterfly Garden, at highlighted area
Gravel 3/8 Bedding & Geotextile Surround for Sub surface Pipe (110mm) Sub line Between Mist garden
Concrete pouring for Blinding of Circular Walls (Remaining part), inside Maze garden, as highlighted a
Soil preparation Prior to Backfilling Between 2 Straight Walls and at Entrance, inside Maze garden, (
Stack Boulders Installed layer (Remaining) at Step 4, at level +876.35, Left side of Geyser Garden, at
Stack Boulders Installed Layer at level +874.80 & +875.20, along Open Channel, (Part 1), at Wadi # 3,
Stack Boulders Installed layers at Levels +878.50, 879.00, 879.50, 880.00, +882.00 & 882.50, (Part 4
Installation of straight UPVC Conduit (Dia.25mm) and Box for Fire Alarm (Flashing Beacon) at Buttres
Excavation & Bed preparation for Water Feature Lines from centre to outside, beside Plant room, at
Installation of straight UPVC Conduit (Dia.25mm) and Box for Fire Alarm (Break Glass) at Buttress Axi
"Inspection of Grouting (Horizontal Joints) for Rock Boulder - RB-135 for All Layers"
Installation of straight UPVC Duct Bank (4x110 mm) for Low Current (Fire and Security Ductbank)
Installation of straight UPVC Duct Bank (4x110 mm) for Low Current (Telecom Ductbank) Ductbank
"Inspection and Compaction Test for backfilling sub-grade 4th Layer (4 of 8) around SBC-01-Transition
Inspection of Sand Covering Layer for Protection of Fire & Security Distribution Line from (G/FS/38 to
Inspection of Sand Covering Layer for Protection of Telecommunications Line from (G/TL/38 to G/TL/27)
Inspection of Backfilling Gravel 3rd Layer (3 of 3) For Manholes FW-A-7, FW-A-8, FW-A-9, FW-A-10, FW
Inspection of Backfilling Sub-grade 5th Layer (5 of 8) For Foul Water Line From FW-A-9 to FW-A-8 - As
Inspection of Backfilling Sub-grade 5th Layer (5 of 8) For Foul Water Line From FW-A-10 to FW-A-9 - As
Inspection of Backfilling Sub-grade 5th Layer (5 of 8) For Foul Water Line From FW-A-11 to FW-A-10 - A
Inspection of Backfilling Sub-grade 5th Layer (5 of 8) For Foul Water Line From FW-A-12 to FW-A-11 - A
Surface preparation prior to Backfilling Surround the Manholes (4 no's) (MH-D-03-03, MH-D-03-04, M
Surface preparation prior to Backfillling along the Boundary Wall (Inner side) @ Grid (EXC1-13 to EXC
Inspection & Compaction tests of 8th Layer Backfilling (Sub-Grade) (Out of 10 layers) along the Bounda
Inspection of Backfilling Sub-grade 4th Layer (4 of 8) For Foul Water Line From FW-A-8 to FW-A-7 - As
Inspection of Backfilling Sub-grade 2nd Layer (2 of 8) For Foul Water Line From FW-A-7 to FW-A-6 - As
"Inspection for Blinding Concrete under foundation of Storm Box Culvert - SBC-09 - Wing Wall - As High
Inspection and Compaction Test For Backfilling Subgrade 5th Layer (5 of 5) for Storm Water Line Fro
"Inspection for the Excavation and Soil Preparation of Storm Box Culvert - SBC-09 - Wing Wall (2nd Part
"Inspection and Compaction Test for backfilling sub-grade 3rd Layer (3 of 8) around SBC-01-Transition
Inspection & Compaction tests of 7th Layer Backfilling (Sub-Grade) (Out of 10 layers) along the Walls
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 6 layers) Surround the Foot
Coordinates & Levels for Footings of Canopy Foundations (8 no's) at Grid (A & B/5-8), at New Ticketin
Concrete Pouring & Shuttering for Footings of Canopy Foundations (8 no's) at Grid (A & B/5-8), at New
Steel Reinforcement for Footings & Neck Columns of Canopy Foundations (8 no's) at Grid (A & B/5-8),
Level and Location for Infill Wall Between BI 87-88 (Inner) as highlighted Zone 2G between Gridline 02-
Level and Location for BUTTRESS BIV 26, 27, 28 Zone 1G
Level and Location for Mass Concrete (3rd) of Strip Footing Between PC 150 - 152 Zone 2J
Inspection of Alignment for installed Baseplates in Crescent 02, Zone 6 2D Outer
Shuttering and Shear Connectors for BUTTRESS BIV 26, 27, 28 Zone 1G
Concreting for BUTTRESS BIV 26, 27, 28 Zone 1G
Anti Termite application under Mass Concrete (3rd) of Strip Footing Between PC 150 - 152 Zone 2J (as h
Shuttering for Mass Concrete (3rd) of Strip Footing Between PC 150 - 152 Zone 2J
Concreting for Mass Concrete (3rd) of Strip Footing Between PC 150 - 152 Zone 2J
Steel Reinforcements for BUTTRESS BOV BOI 35, 36, 37, 38 Zone 1J
Grouting for Anchor bolt at zone 2Q inner and outer (as highlighted) using Conbextra GP
Shear Connectors (implant) for BUTTRESS BOI BOV 64 Zone 2B
Concreting for RING BEAM Zone 1B (Inner) Axis 01-1, 01D to 01G (as highlighted)
Concreting for RING BEAM Zone 2J (Outer) Axis 02-2, 02AB to 02AE (as highlighted)
Concreting for RING BEAM Zone 2B (Outer) Axis 02-2, 02D to 02G (as highlighted)
Stack Boulders Installed layer at Level +881.50, (Part 4) along Boundary wall Span 35 & 36, Inside Wa
Stack Boulders Installed 2 layers (Remaining) at Step 5, at levels +876.75 & +877.05), Left side of G
Stack Boulders Installed Layers upto Levels +880.50 & +881.00, along the Boundary wall span 29 & 3
Inspection & Compaction tests of 5th Layer Backfilling (Sub-Grade) (Out of 7 layers) along the Walls (O
Steel Reinforcement for Wall (200mm thk. Outer Wall) at Grid (A/1-15) @ Butterfly Garden, as highli
Single layer 4mm thk Modified Bituminous Water Proofing Membrane on Footing Sides (Upto T.O.F) at
Concrete pouring for Blinding under Electrical Handholes of Emergency (MH/ZG/EM/01-06 & 09-10),
Stack Boulders Installed layers at Levels +875.40, +875.80 & +878.00, at Left Side Water Play Garden
Installation of earthing clamps with conductor 70mm (1pc.) for earthing reinforcement steel re-bar at
Installation of earthing clamps with conductor 70mm (1pc.) for earthing reinforcement steel re-bar at
Stack Boulders Installed Layers at Levels +879.00 & +879.50, at Top & Right Side of Mist Garden (Part
Stack Boulders Installed Layer at level +874.40, along Open Channel, (Part 1), at Wadi # 3, Inside Wa
Coordinates & Levels of Blinding under Electrical Handholes of Emergency (MH/ZG/EM/01-06 & 09-10
Excavation & Soil preparation for Electrical Handholes of Emergency (MH/ZG/EM/01-06 & 09-10), Fi
Surface Preparation Prior to Stone Cladding for Boundary wall (Inner & Outer Faces) @ span 2, at Wa
Inspection and compaction test 6th layer for backfilling of Strip Footing and PC between PC 146-148 (6t
Inspection and compaction test 3rd layer for MCPE 2 Axis 03-2, 02AH to AF Zone 2K (as highlighted) (3r
Inspection and compaction test 3rd layer for backfilling of Strip Footing and PC between PC 140-142 (3r
Inspection and compaction test 5th layer for backfilling of MCPE 1 (as highlighted) Zone 2M 2N (5th of
Level and Location for BUTTRESS BOV 24, 25 Zone 1F 1G
Shuttering and Shear Connectors for BUTTRESS BOV 24, 25 Zone 1F 1G
Inspection of Thrust Block for UPVC Pipe (200 mm Dia) for Fire Water Line at Zone- B&C - As Highlighte
"Inspection of Thrust Block for UPVC Pipe (200mm) for Potable Water Line at Zone-B&C - As Highlighte
Concreting for BUTTRESS BOV 24, 25 Zone 1F 1G
Inspection for Blinding Concrete under Fire & Security Line Pit B/FS/16, B/FS/24, G/FS/18, G/FS/33 at Z
Inspection for Blinding Concrete under Telecommunication Line Pit B/TL/17, B/TL/21, G/TL/29, G/TL/31
Geotextile sheet & Screed Protection under Strip footing between PC 131-133 Zone 2F (as Highlighted)
Inspection of Backfilling Sub-grade 6th Layer (6 of 8) For Foul Water Line From FW-A-13-3 to FW-A-13-4
Surface preparation & Base primer coating for south administraton internal foundation (as Highlighted)
Two coats of bituminous damp proofing coating for south administraton internal foundation (as Highli
"Inspection of Backfilling Sub-grade 6th Layer (6 of 8) For Foul Water Line From FW-A-13-1 to FW-A-13
Shuttering for Strip Footing Wall (upto SOG only) for Large Mosque ZONE 1G (as highlighetd)
Inspection of Backfilling Sub-grade 5th Layer (6 of 8) For Foul Water Line From FW-A-13 to FW-A-13-1
"Inspection of Backfilling Sub-grade 3rd Layer (3 of 8) For Foul Water Line From FW-A-13-2 to FW-A-13
Inspection of Backfilling Sub-grade 4th Layer (4 of 8) For Foul Water Line From FW-A-14 to FW-A-13 - A
Surface Preparation and Solvent Base Primer for Retaining wall (wall & foundation) (inner) axis 01AR t
Inspection of Backfilling Gravel 2nd Layer (2 of 3) For Manholes FW-A-7, FW-A-8, FW-A-9, FW-A-10, FW
Inspection of Backfilling Gravel 1st Layer (1 of 3) around Manhole FW-A-13-2 - As Highlighted (SP#118)
Surface Preparation and Solvent Base Primer for Retaining wall (wall & foundation) (inner) axis 01AP t
Steel Reinforcement for BUTTRESS BIV BII 33, 34, 35 Zone 1H
"Inspection for Casting Concrete for Short Piece and Surface Preperation prior to start waterproofing
Concreting of Foundation for Tunnel 1 (as Highlighted) Zone 2H
Concreting for BUTTRESS BOI 82, 83 (with beam) Zone 2F
Shuttering and Shear Connectors for BUTTRESS BOI 82, 83 (with beam) Zone 2F
Surface Preparation and Base Primer Coating for Isolated Column of Large Mosque (as highlighted) Zon
Pre-Assembly Bolt Tightening Inspection for the Aviary Garden from GL 16-23.
Block work Upto Lintel height for all walls Inside Public Toilet # 2, At highlighted area in attached Dra
First layer Block work Layout for all walls Inside Public Toilet # 3, At highlighted area in attached Draw
Block work Upto Lintel height for all walls Inside Public Toilet # 1, At highlighted area in attached Dra
Steel Reinforcement for Wall (200mm thk. Outer Wall) at Grid (A/14-21) @ Butterfly Garden, at highl
Steel Reinforcement for Wall & Columns (From T.O.F to Base plate level) at Grid (A/5-14) @ Butterfly
Inspection & Compaction tests of 7th Layer Backfilling (Sub-Grade) (Out of 10 layers) along the Bounda
Inspection & Compaction tests of 6th Layer Backfilling (Sub-Grade) (Out of 7 layers) along the Walls (
Soil Preparation Prior to Backfilling along the Boundary wall Foundation (Inner & Outer Sides) @ span
Aluminium Flashing & Sealant for Water Proofing on foundation & Kickers of Boundary wall (Inner &
Excavation & Bed Preparation for Sub surface Pipe (110mm) Sub line Between Mist garden & Water pl
Concrete Pouring for Blinding Under Electrical Handholes of Low voltage (MH/DG/LV/01-08), Telec
Coordinates & Levels of Blinding Under Electrical Handholes of Low voltage (MH/DG/LV/01-08), Te
Warning Tape Installation of Main Fire Water Pipes (250mmØ-UPVC-Class-5) in between K/F/03 and G/F
Sand Cover & Pipes Protection (30 cm above Pipes) of Main Fire Water Pipes (250mmØ-UPVC-Class-5)
Installation of Main Fire Water Pipes (250mmØ-UPVC-Class-5) in between K/F/03 and G/F/05 Pit . As
Level and Location for BUTTRESS BII 59 (2nd) Zone 2A
Level and Location for BUTTRESS BII 22, 23, 24, 25 Zone 1F 1G
Level and Location for MCPE 2 WALL (OUTER ) at axis 03E-02X Zone 2G (as highlighted)
Single layer of 4mm thick modified bituminous waterproofing membrane under Strip footing between P
Surface Preparation and Solvent Base Primer for RC Strip footing between PC 146-148-150 Zone 2J (as H
Surface Preparation and Solvent Base Primer for MCPE 3 Wall and Foundation Axis 02S TO 02R, 03-2 Zon
Two layers of 4mm thick modified bituminous water proofing membrane for MCPE 3 Wall and Foundation
Shuttering and Shear Connectors for BUTTRESS BII 59 (2nd) Zone 2A
Inspection of Backfilling Sub-grade 4th Layer (4 of 8) For Foul Water Line From FW-A-9 to FW-A-8 - As
Concreting for BUTTRESS BII 59 (2nd) Zone 2A
Inspection of Backfilling Sub-grade 4th Layer (4 of 8) For Foul Water Line From FW-A-10 to FW-A-9 - As
Inspection of Backfilling Sub-grade 4th Layer (4 of 8) For Foul Water Line From FW-A-11 to FW-A-10 - A
Inspection of Backfilling Sub-grade 4th Layer (4 of 8) For Foul Water Line From FW-A-12 to FW-A-11 - A
Inspection of Backfilling Sub-grade 5th Layer (5 of 8) For Foul Water Line From FW-A-13-3 to FW-A-13-4
"Inspection of Backfilling Sub-grade 5th Layer (5 of 8) For Foul Water Line From FW-A-13-1 to FW-A-13
Surface Preparation and Solvent Base Primer under Strip footing between PC 131-133 Zone 2F (as Highl
Inspection of Backfilling Sub-grade 5th Layer (5 of 8) For Foul Water Line From FW-A-13 to FW-A-13-1
Inspection of Backfilling Sub-grade 4th Layer (4 of 8) For Foul Water Line From FW-A-13-4 to SBC incl
Inspection of Backfilling Sub-grade 3rd Layer (3 of 8) For Foul Water Line From FW-A-8 to FW-A-7 - As
"Inspection of Backfilling Sub-grade 2nd Layer (2 of 8) For Foul Water Line From FW-A-13-2 to FW-A-1
Inspection of Sand Covering Layer for Protection of Telecommunications Line from (K/TL/01 to K/TL/21)
Inspection of Sand Covering Layer for Protection of Fire & Security Distribution Line from (K/FS/01 to
Inspection of Backfilling Sub-grade (above the gravel) 1st Layer (1 of 3) around the Manhole for MH-D-0
Shuttering and Shear Connectors for BUTTRESS BII 22, 23, 24, 25 Zone 1F 1G
"Inspection of Backfilling Gravel 1st Layer (1 of 5) around the Manhole for MH-D-07 - as Highlighted (S
Concreting for BUTTRESS BII 22, 23, 24, 25 Zone 1F 1G
Excavation for MV Line from B/MV/25 TO B/MV/02 at Zone-B including Pit B/MV/25, B/MV1B, B/MV/02 a
Shuttering for MCPE 2 WALL (OUTER ) at axis 03E-02X Zone 2G (as highlighted)
Excavation for Fire & Security Distribution Line from G/FS/12 to G/FS/37, including Pit G/FS/12, G/FS/2
Excavation for Telecommunication Line between G/TL/14 to G/TL/23 including pit G/TL/14, G/TL/23 at
Concreting for MCPE 2 WALL (OUTER ) at axis 03E-02X Zone 2G (as highlighted)
Excavation for MV Line from G/MV/25 TO G/MV/02 at Zone-G including Pit G/MV/24, G/MV14, G/MV/15
Steel Reinforcements for Infill Wall Between BOI 126-127 (OUTER) as highlighted Zone 2R between Grid
Inspection and compaction test 2nd layer for MCPE 2 Axis 03-2, 02AH to AF Zone 2K (as highlighted) (2
Inspection and compaction test 4th layer for backfilling of MCPE 1 (as highlighted) Zone 2M 2N (4th of
Inspection and compaction test 2nd layer for backfilling of Strip Footing and PC between PC 140-142 (2
Inspection and compaction test 5th layer for backfilling of Strip Footing and PC between PC 146-148 (5t
Inspection and compaction test 2nd layer for backfilling of MCPE 1 (as highlighted) Zone 2M 2N (2nd
Inspection and compaction test 1st layer for MCPE 2 Axis 03-2, 02AH to AF Zone 2K (as highlighted) (1s
Inspection and compaction test 4th layer for backfilling of Strip Footing and PC between PC 146-148-150
Inspection and compaction test 3rd layer for backfilling of MCPE 1 (as highlighted) Zone 2M 2N (3rd of
Installation of straight UPVC Conduit (Dia.25mm) and Box for Fire Alarm (Speaker) at Infill Wall Axis
Inspection and compaction test 1st layer for backfilling of Strip Footing and PC between PC 140-142 (1s
Surface prepration prior to start backfilling at MCPE 2 axis 03-2, 02AH to AF zone 2K (as highlighted)
Installation of straight UPVC Duct Bank (4x110 mm) for Low Current (Telecom Communication TC) from
Installation of straight UPVC Duct Bank (2x110 mm) for Low Current (Fire & Security FS) K/RC-FS/01
Stack Boulders Installed layer at Level +882.50, (Part 4) along Boundary wall Span 33 & 34, Inside Wa
Stack Boulders Installed layers at Levels +879.00, at Left Side Water Play Garden (Part 2), As Highlig
Stack Boulders Installed layer at Level +877.07, Between Geyser Garden & Boundary wall (at span 16)
Protection Layer 4mm thk Bituminous Protection Board on Waterproofing of footing & Kicker of Walls (I
Soil Preparation Prior to Backfilling Surround the Footings (6 no's) of Canopy, (At B.O.B) Inside Physi
Protection Layer 4mm thk Bituminous Protection Board on Waterproofing of Footings (6 no's) of Canop
Solvent Base Primer Coating prior to Membrane Waterproofing on Footing Sides (Upto T.O.F) at Grid (
Surface Preparation Prior to Water proofing on Footing Sides (Upto T.O.F) at Grid (B/1-21) & (1&21/A-
Stack Boulders Installed Layers upto Levels +880.00 & +880.50, along the Boundary wall span 29 & 3
Stack Boulders Installed layer at Level +876.77, at Entrance Gate, Near Boundary Wall Span 14, Insid
Pipe Installation of Riser (100mmØ & 50mmØ - Cast Iron) for (Rain Water Pipe, Vent Water Pipe, Fir
Pipe Sleeves Installation of (160mmØ, 250mmØ & 315mmØ - UPVC- Class-4) for (WS, FF, GW, CHW, DP
Installation of Main Potable Water Pipes (50 & 200mmØ-UPVC-Class-5) in Between B/PW/07 to B/PW/1
Installation of Main Fire Water Pipes (250mmØ-UPVC-Class-5) From Pit # L/F/03 to the End of the Line
Inspection and Compaction Test for backfilling sub-grade 2nd Layer (2 of 3) above the Sand cover for
'Pipe Installation of Strom Water Line OUTFAL-H for (315mmØ-UPVC Pipes-Class 4) from ( Catch Basin Pi
Level and Location for Mass Concrete (2ND) of Strip Footing Between PC 150 - 152 Zone 2J
Level and Location for RING BEAM Zone 1B (Inner) Axis 01-1, 01D to 01G (as highlighted)
Level and Location for Slab of TUNNEL 1 part C (as highlighted) Zone 2H
Level and Location for BUTTRESS BOV 22, 23 Zone 1F
Level and Location for Mass Concrete of Strip Footing Between PC 81-83, 80-82-84 Zone 1N (as highligh
Level and Location for Infill Wall (KICKER & UPSTAND) Between BI 86-87 (Inner) as highlighted Zone 2
Installation and Survey Report for Location and Levels of Anchor Bolts for RING BEAM Zone 1B (Inner)
Shuttering for RING BEAM Zone 1B (Inner) Axis 01-1, 01D to 01G (as highlighted)
Steel Reinforcements of FOUNDATION of TUNNEL 1 part C (as highlighted) Zone 2H
Shuttering of FOUNDATION of TUNNEL 1 part C (as highlighted) Zone 2H
Shuttering and Shear Connectors for BUTTRESS BOV 22, 23 Zone 1F
Concreting for BUTTRESS BOV 22, 23 Zone 1F
Steel Reinforcements for RING BEAM Zone 1B (Inner) Axis 01-1, 01D to 01G (as highlighted)
Concreting of FOUNDATION of TUNNEL 1 part C (as highlighted) Zone 2H
Anti Termite application under Mass Concrete (2nd) of Strip Footing Between PC 150 - 152 Zone 2J (as h
Shuttering for Mass Concrete (2nd) of Strip Footing Between PC 150 - 152 Zone 2J
Concreting for Mass Concrete (2nd) of Strip Footing Between PC 150 - 152 Zone 2J
Steel Reinforcements for Infill Wall Between BI 91-92 (Inner) as highlighted Zone 2H between Gridline
Anti Termite application under Mass Concrete of Strip Footing Between PC 81-83, 80-82-84 Zone 1N
Shuttering for Mass Concrete of Strip Footing Between PC 81-83, 80-82-84 Zone 1N (as highlighted)
Steel Reinforcements for Infill Wall (KICKER & UPSTAND) Between BI 86-87 (Inner) as highlighted Zone
Shuttering for Infill Wall (KICKER & UPSTAND) Between BI 86-87 (Inner) as highlighted Zone 2G between
Concreting for Infill Wall (KICKER & UPSTAND) Between BI 86-87 (Inner) as highlighted Zone 2G betwee
Steel Reinforcements for Strip Footing Wall (upto SOG only) for Large Mosque ZONE 1G (as highlighetd)
Inspection of Backfilling Sub-grade 3rd Layer (3 of 8) For Foul Water Line From FW-A-9 to FW-A-8 - As
Inspection of Backfilling Sub-grade 3rd Layer (3 of 8) For Foul Water Line From FW-A-10 to FW-A-9 - As
Inspection of Backfilling Sub-grade 3rd Layer (3 of 8) For Foul Water Line From FW-A-11 to FW-A-10 - A
Inspection of Backfilling Sub-grade 3rd Layer (3 of 8) For Foul Water Line From FW-A-12 to FW-A-11 - A
Inspection of Backfilling Sub-grade 4th Layer (4 of 8) For Foul Water Line From FW-A-13-3 to FW-A-13-4
Inspection of Backfilling Sub-grade 4th Layer (4 of 8) For Foul Water Line From FW-A-13-1 to FW-A-13-2
Inspection of Backfilling Sub-grade 4th Layer (4 of 8) For Foul Water Line From FW-A-13 to FW-A-13-1 -
Inspection of Backfilling Sub-grade 3rd Layer (3 of 8) For Foul Water Line From FW-A-13-4 to SBC - As H
Inspection of Backfilling Sub-grade 3rd Layer (3 of 8) For Foul Water Line From FW-A-14 to FW-A-13 - A
Inspection of Backfilling Sub-grade 2nd Layer (2 of 8) For Foul Water Line From FW-A-8 to FW-A-7 - As
"Inspection of Backfilling Gravel 3rd Layer (3 of 3) For Manholes FW-A-13-4, FW-A-13-3, FW-A-13-1, FW
Inspection of Backfilling Sub-grade 1st Layer (1 of 8) For Foul Water Line From FW-A-7 to FW-A-6 - As H
Excavation for Fire & Security Distribution Line from (C/FS/08 to B/RC-FS/18) including Branch and Pit
Excavation for Telecommunication Line between C/TL/15 to BG/D/TL/03) including branch and pit C/TL/
Inspection for Installation of Potable Water Line Isolation Pit - B/PW/05, F/PW/03, F/PW/13, F/PW/14,
Inspection for Installation of Fire Line Isolation Pit B/F/04, B/F/05, F/F/03, F/F/08, G/F/01, G/F/02, G/F/
Inspection and Compaction Test for backfilling sub-grade 1st Layer (1 of 1) above the Sand cover for P
Inspection and Compaction Test for backfilling sub-grade 3nd Layer (3 of 3) above the Sand cover for Fi
Inspection and Compaction Test For Backfilling Subgrade 1st Layer (1 of 4) for Storm Water Line From
Inspection and Compaction Test For Backfilling Subgrade 1st Layer (1 of 4) for Storm Water Line Fro
Inspection of Backfilling Sub-grade 1st Layer (1 of 8) For Foul Water Line From FW-A-13-2 to FW-A-13-3
Surface Preparation Prior to Start Backfilling Gravel For Manhole - FW-A-13-2 - as Highlighted
Inspection of Backfilling Gravel 5th Layer (5 out of 6) around the Manhole for MH-D-08 - as Highlighted
Installation of straight UPVC Duct Bank (4x110 mm) for Low Current (Telecom Communication TC) fr
Inspection and Compaction Test For Backfilling Subgrade 1st Layer (1 of 4) for Storm Water Line Fro
Installation of straight UPVC Duct Bank (2x110 mm) for Low Current (FS) G/RC-FS/19 to G/RC-FS/24
Installation of straight UPVC Conduit (Dia.25mm) and Box for Fire Alarm (Speaker) at Infill Wall Axis
Surface Preparation Prior to Start Backfill Gravel for Manhole MH-D-07 as Highlighted
Inspection and Compaction Test For Backfilling Subgrade 3rd Layer (3 of 5) for Storm Water Line Fro
Stack Boulders Installed Layer at Level, +879.50, at Bottom side of Water Play Garden along Aviary Wa
Grouting (with ConbExtra GP) for installed Baseplate from Grids (16-23/ Right & Left Sides) on Bounda
Stack Boulders Installed layers at Levels +878.50, at Left Side Water Play Garden (Part 2), As Highlig
Installation of Rock and Boulder No. RB-135 - 4th Layer (4 of 4)
Inspection of Backfilling Gravel 1st Layer (1 of 3) For Manholes FW-A-7, FW-A-8, FW-A-9, FW-A-10, FW
Surface Preparation Prior to Start Backfilling Gravel For Manholes FW-A-14 - AS Highlighted
"Inspection of Backfilling Gravel 2nd Layer (2 of 2) For Manholes and Gullies MH-G-01-07, MH-G-01-06
"Inspection of Backfilling Gravel 2nd Layer (2 of 3) For Manholes FW-A-13-4, FW-A-13-3, FW-A-13-1, FW
Inspection of Backfilling Sub-grade 2nd Layer (2 of 8) For Foul Water Line From FW-A-9 to FW-A-8 - As
Inspection of Backfilling Sub-grade 2nd Layer (2 of 8) For Foul Water Line From FW-A-10 to FW-A-9 - As
Inspection of Backfilling Sub-grade 2nd Layer (2 of 8) For Foul Water Line From FW-A-11 to FW-A-10 - A
Inspection of Backfilling Sub-grade 2nd Layer (2 of 8) For Foul Water Line From FW-A-12 to FW-A-11 - A
Inspection of Backfilling Sub-grade 3rd Layer (3 of 8) For Foul Water Line From FW-A-13-3 to FW-A-13-4
Inspection of Backfilling Sub-grade 3rd Layer (3 of 8) For Foul Water Line From FW-A-13-1 to FW-A-13-2
Inspection of Backfilling Sub-grade 3rd Layer (3 of 8) For Foul Water Line From FW-A-13 to FW-A-13-1 -
Inspection of Backfilling Sub-grade 2nd Layer (2 of 8) For Foul Water Line From FW-A-13-4 to SBC - As
Inspection of Backfilling Sub-grade 2nd Layer (2 of 8) For Foul Water Line From FW-A-14 to FW-A-13 - A
Inspection of Backfilling Sub-grade 1st Layer (1 of 8) For Foul Water Line From FW-A-8 to FW-A-7 - As H
"Inspection for the Excavation and Soil Preparation of Storm Box Culvert - SBC-09 - Wing Wall (As Highl
Stack Boulders Installed layer at Level +877.77, at 1st line of 'L' shape boulders & Remaining part,
Stack Boulders Installed Layer at level +874.00, along Open Channel, (Part 1), at Wadi # 3, Inside Wa
Inspection & Compaction tests After Excavation for Water Feature, at Grid (F-Q/10-13), at Managemen
Slated layer 4mm thk Modified Bituminous Water Proofing Membrane on foundation & Kickers of Boun
Inspection & Compaction tests of 5th Layer Backfilling (Sub-Grade) (Out of 7 layers) along the Walls (
Concrete Pouring & Shuttering for Footings of Canopy Foundations (8 no's) at Grid (A & B/1-4), at New
Coordinates & Levels for Footings of Canopy Foundations (8 no's) at Grid (A & B/1-4), at New Ticketin
Steel Reinforcement for Footings & Neck Columns of Canopy Foundations (8 no's) at Grid (A & B/1-4),
Stack Boulders Installed layers at Levels +877.60 & +878.00, at Left Side Water Play Garden (Part 2),
Stack Boulders Installed layers at Levels +877.07 & +877.47, at 1st line of 'L' shape boulders & Rema
Stack Boulders Installed layers at Levels +876.07 & +876.47, at Entrance Gate, Near Boundary Wall S
Stack Boulders Installed Layer at level +873.60, along Open Channel, (Part 1), at Wadi # 3, Inside Wa
Stack Boulders Installed layers at Levels +881.00, +881.50 & +882.00, (Part 4) along Planted Bed 3 a
Excavation & Soil Preparation Prior to Boulders, at Left Side Geyser Garden (Remaining part) towards
Level and Location for Ring Beam Zone 2B (Outer) Zxis 02-2, 02D to 02G as highlighted.
Installation and Survey Report for Location and Levels of Anchor Bolts for Ring Beam (Outer) Axis 02
Shuttering for Ring Beam Zone 2B (Outer) Axis 02-2, 02D to 02G as highlighted.
Installation of straight UPVC Conduit (Dia.25mm) and Box for Voice and Data (WIFI) at Buttress Axis (
Installation of straight UPVC Conduit (Dia.25mm) and Box for Fire Alarm (Speaker) at Buttress Axis (01
Installation of straight UPVC Conduit (Dia.25mm) and Box for Fire Alarm (Speaker) at Buttress Axis (01
Installation of straight UPVC Conduit (Dia.32mm) for Power(Socket Outlet) at Crescent-01 (Buttress Axi
Installation of straight UPVC Conduit (Dia.32mm) for Power(Socket Outlet) at Crescent-01 (Buttress Axi
Inspection of Alignment for installed Baseplates in Crescent 02, Zone 2 2P Outer.
Installation of Rock and Boulder No. RB-134 - 4th layer (4 of 4)
Installation of straight UPVC Conduit (Dia.110mm - wall sleeve) at the Large Mosque as per attached hi
Inspection of Water Proofing for the Duct Bank of Fire & Security Distribution Line from F/FS/17 to F/FS
Surface Preparation prior to start water proofing for the Duct Bank of Fire & Security Distribution Line
Inspection of Water proofing for the Duct Bank of Telecommunications Line from F/TL/12 to F/TL/04 at
Surface Preparation prior to start water proofing for the Duct Bank of Telecommunications Line from F/
Inspection of Backfilling Sub-grade 1st Layer (1 of 8) For Foul Water Line From FW-A-9 to FW-A-8 - As H
Inspection of Backfilling Sub-grade 1st Layer (1 of 8) For Foul Water Line From FW-A-10 to FW-A-9 - As
Inspection of Backfilling Sub-grade 1st Layer (1 of 8) For Foul Water Line From FW-A-11 to FW-A-10 - A
Inspection and Compaction Test For Backfilling Subgrade 4th Layer (4 of 5) for Storm Water Line Fro
Inspection of Backfilling Sub-grade 1st Layer (1 of 8) For Foul Water Line From FW-A-12 to FW-A-11 - A
Inspection of Backfilling Sub-grade 3rd Layer (3 of 3) For Storm Water Line above Warning Tape Fro
Inspection of Backfilling Sub-grade 2nd Layer (2 of 8) For Foul Water Line From FW-A-13-3 to FW-A-13-4
Inspection of Backfilling Sub-grade 2nd Layer (2 of 8) For Foul Water Line From FW-A-13-1 to FW-A-13-2
Inspection of Backfilling Sub-grade 2nd Layer (2 of 8) For Foul Water Line From FW-A-13 to FW-A-13-1 -
Inspection and Compaction Test for backfilling sub-grade 2nd Layer (2 of 3) above the Sand cover for Fi
Inspection and Compaction Test for backfilling sub-grade 1st Layer (1 of 4) above the Sand cover for Fi
Excavation for MV Line from G/MV/25 TO G/MV/02 at Zone-G including Pit G/MV/24, G/MV14, G/MV/15
"Inspection and Compaction Test for backfilling sub-grade 2nd Layer (2 of 8) around SBC-01-Transition
Inspection for Blinding Concrete under Fire & Security Line Pit B/FS/36, B/FS/27, G/FS/17 at Zone-B&G -
Inspection for Blinding Concrete under Telecommunication Line Pit B/TL/36, B/TL/35, G/TL/32 at Zone-B
Inspection of Backfilling Sub-grade 1st Layer (1 of 8) For Foul Water Line From FW-A-13-4 to SBC - As H
Inspection of Backfilling Sub-grade 1st Layer (1 of 8) For Foul Water Line From FW-A-13-3 to FW-A-13-4
Inspection of Backfilling Sub-grade 1st Layer (1 of 8) For Foul Water Line From FW-A-13-1 to FW-A-13-2
Inspection of Backfilling Sub-grade 1st Layer (1 of 8) For Foul Water Line From FW-A-13 to FW-A-13-1 -
Inspection of Backfilling Sub-grade 1st Layer (1 of 8) For Foul Water Line From FW-A-14 to FW-A-13 - A
"Inspection of Backfilling Gravel 1st Layer (1 of 3) For Manholes FW-A-13-4, FW-A-13-3, FW-A-13-1, FW
Installation of Anchor Bolts and Check Co-ordinates and Levels for Canopy Foundation for Seating Area-1
Stone Cladding on Block Walls (Outer Face) at Whispering Cave 1, From Inside Sound & Light Garden,
2nd Coat Damp proofing for footing & Kicker of Walls (Inner Sides) at 2 Straight Walls and front side,
Inspection & Compaction tests of 6th Layer Backfilling (Sub-Grade) (Out of 10 layers) along the Bounda
Excavation & Soil Preparation for Water Feature and Mechanical Room, at Grid (F-Q/10-13), at Manag
Stack Boulders Installed Layer (At level +878.50) at Bottom Right Side of Mist Garden, At Highlighted
Stack Boulders Installed Layer upto Level +879.00, at Left Side of Mist Garden (Part 1), At Highlighte
Stack Boulders Installed Layer at level +873.20, along Open Channel, (Part 1), at Boat Garden, At Hig
Stone Cladding for Boundary wall (Both sides Remaining) and Column (All sides) @ Span 49 of Water
Grouting for Stone Cladding of Boundary wall (Outer Sides) at Span 63, As per Attached Highlighted D
Grouting for Stone Cladding of Boundary wall (Inner Sides) at Span 64 & 65 and Column C66B (All Side
Inspection of alignment for installed baseplate in aviary garden from GL 16 to GL 23
Surface Preparation Prior to start Backfilling at Strip footing & PC between PC 140-142 Zone 2H (as high
Surface Preparation Prior to start Backfilling at MCPE 1 Zone 2N 2M axis 03S to 03R (as highlighted)
Inspection and compaction test 1st layer for backfilling of MCPE 1 (as highlighted) Zone 2M 2N (1st of 6
Inspection and compaction test 3rd layer for backfilling of Strip Footing and PC between PC 146-148-150
Inspection and compaction test 6th layer for backfilling of Strip Footing and PC between PC 14-16 (5th
Level and Location for middle Wall for Tunnel 1 (as Highlighted) Zone 2H
Two Layers of 4mm thick modified bituminous waterproofing membrane for MCPE 1 Wall (as Highlighte
Protection layer of 4mm thick bituminous protection board for MCPE 1 Wall (as Highlighted) ZONE 2M 2
Surface Preparation and Solvent Base Primer for MCPE 2 Wall (as Highlighted) ZONE 2G 2H Axis 02X to 0
Steel Reinforcement for MCPE 2 WALL (OUTER ) at axis 03E, 03-2 to 03-1 Zone 2G 2H (as highlighted)
Steel Reinforcements for Strip Footing Wall (upto SOG only) for Large Mosque ZONE 1G (as highlighetd)
Steel Reinforcements for BUTTRESS BII BIV 31, 32 Zone 1H
Shuttering of middle Wall for Tunnel 1 (as Highlighted) Zone 2H
Concreting of middle Wall for Tunnel 1 (as Highlighted) Zone 2H
Concreting for TUNNEL 2 WALL at axis 01-2 Zone 2F (as highlighted) (2nd)
Concreting for BUTTRESS BII 84, 85, 86 (with beam) Zone 2F 2G
Concreting for Infill Wall Between BI 127-128 (Inner) as highlighted Zone 2R
Inspection & Compaction tests of Single Layer Backfilling (Sub-Base) (from level +875.70 to +875.90),
Inspection & Compaction tests of Single Layer Backfilling (Sub-Grade) (from level +875.45 to +875.70)
Protection layer 4mm thk Bituminous Protection Board for Water Proofing Membrane on foundation &
Soil Preparation Prior to Backfilling Surround Pargola Footings (6 no's), at Grid (G&P/3, 4 & 5), (at
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 7 layers) (After 3 layers
Concrete Pouring & Shuttering for Footing of Plant Room at Physic Garden, at highlighted area in att
Level and Location for RING BEAM Zone 2J (OUTER) Axis 02-2, 02AB to 02AE (as highlighted)
Level and Location for Excavation for Strip Footing Between PC 81-83, 80-82-84 Zone 1N
Inspection and compaction test 2nd layer for backfilling of Strip Footing and PC between PC 146-148-15
Installation and Survey Report for Location and Levels of Anchor Bolts for RING BEAM (OUTER) Axis 02-
Inspection of alignment for installated baseplate in crescent 2 Zone 7 2C Inner (as per attached)
Inspection of alignment for installated baseplate in crescent 2 Zone 6, 2D inner (as per attached)
Two layers of bituminous waterproofing coating for Strip Footing of Large Mosque (as highlighted) Zone
Steel Reinforcements for RING BEAM Zone 2J (Outer) Axis 02-2, 02AB to 02AE (as highlighted)
Shuttering for RING BEAM Zone 2J (Outer) Axis 02-2, 02AB to 02AE (as highlighted)
Cementitious Water proofing under Retaining Wall (as Highlighted) ZONE 1D Axis 01M to 01K
Two layer of bituminous waterproofing coating for Isolated Footing of Large Mosque (as highlighted) Z
Steel Reinforcements for Infill Wall Between BI 87-88 (Inner) as highlighted Zone 2G
Concrete Pouring for Blinding under Foundations (16 no's) at Grid (A & B/1-8) of Canopy at New Ticke
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 7 layers) (After 3 layers
Stack Boulders Installed layers at Levels +875.25 & +875.45, (Small area) at Top Right Side corner of
Stack Boulders Installed layers at Level +877.07, (Small area) at Bottom Right Side of Geyser Garden,
Excavation for Electrical Low Current, Power Containment & Fire alarm Lines Between Geyser Garden
Excavation for Electrical Power Containment Lines at Bottom Left Side of Mist Garden, Inside Water G
Concrete Pouring for Blinding under Electrical Low Voltage Handholes (16 no's), (MH/ZG/LV/1 to MH/
Excavation & Soil Preparation Prior to Boulders Between Geyser Garden & Boundary wall (at span 15 &
Surface Preparation Prior to Start Backfilling Gravel For Manholes FW-A-08, FW-A-07, FW-A-06, FW-A-0
Inspection And Compaction Test of Backfilling Sub-grade 1st Layer (1 of 2) For Manhole MH-G-03-02 AS
"Inspection of Backfilling Gravel 1st Layer (1 of 2) For Manholes And Gullies MH-G-01-07, MH-G-01-0
Inspection of Backfilling Sub-grade 2nd Layer (2 of 3) For Storm Water Line Above Warning Tape Fro
Inpection of Casting Concrete for Short Piece & Surface Preperation prior to start waterproofing and
Inspection and Compaction Test for backfilling sub-grade 1st Layer (1 of 3) above the Sand cover for P
Inspection and Compaction Test for backfilling sub-grade 1st Layer (1 of 4) above the Sand cover for Fi
Inspection for Blinding Concrete under Fire & Security Line Pit B/FS/19, B/FS/21, B/FS/22, B/FS/37 at Zo
Inspection for Blinding Concrete under Telecommunication Line Pit B/TL/19, B/TL/25, B/TL/37, B/TL/42 a
Inspection of Backfilling Gravel 4th Layer (4 out of 6) around the Manhole for MH-D-08 - as Highlighted
"Inspection and Compaction Test for backfilling sub-grade 1st Layer (1 of 8) around SBC-01-Transition
Inspection of Backfilling Gravel 3rd Layer (3 out of 4) around the Manhole for MH-D-08 - as Highlighted
Inspection of Sand bedding for Potable Water Line at Zone-B including branch and Pit B/PW/05 - as hig
Inspection of sand bedding under pipe for Fire Water Line at Zone-B including branch and Pit B/F/04 as
"Soil Preparation prior to start backfill around SBC-01-Transition Area - as highlighted"
"Inspection and Compaction Test For Backfilling Subgrade 3rd Layer (3 of 3) for Storm Water Line
"Surface Preparation Prior to Start Backfilling Gravel For Manholes FW-A-13-4, FW-A-13-3, FW-A-13-1
Inspection of Concrete Pouring for Canopy Column Neck of Seating Area (1) Zone-K & L (SA-15, SA-16, SA
"Inspection of Formwork for Canopy Column Neck of Seating Area (1) Zone-K & L (SA-15, SA-16, SA-17)
Inspection of Backfilling Gravel 2nd Layer (2 out of 4) around the Manhole for MH-D-08 - as Highlighted
Inspection for Blinding Concrete under Fire Water Line Pit B/F/04, B/F/05, F/F/03, F/F/08, F/F/11, G/F/
Inspection for Blinding Concrete under Potable Water Line Pit B/PW/05, F/PW/03, F/PW/13, F/PW/14,
"Inspection and Compaction Test for NGL of Telecommunication Line between C/TL/15 to G/TL/29) at Zon
Inspection and Compaction Test for backfilling sub-grade 1st Layer (1 of 3) above the Sand cover for Fi
"Inspection of Backfilling Sub Grade Above Gravel (1ST Layer out of 8) around the Manhole And Gulli
Installation of straight UPVC Duct Bank (4x110 mm) for Low Current (Telecom Communication TC) fro
Installation of straight UPVC Duct Bank (2x110 mm) for Low Current (FS) K/RC-FS/03 to K/RC-FS/02
Installation of straight UPVC conduit (Dia.25mm) and Box for Voice and Data (Telephone & Data) at B
Installation of straight UPVC conduit (Dia.25mm) and Box for Voice and Data (CAM) at Butress Axis (
Installation of straight UPVC conduit (Dia.25mm) and Box for Security (CAM) at Butress Axis (01/1W)
Installation of straight UPVC conduit (Dia.25mm) and Box for Fire Alarm (Break Glass) at the Enteranc
Level and Location for BUTTRESS BOI 61 (2ND) Zone 2A
Level and Location for Slab of TUNNEL 1 part C (as highlighted) Zone 2H
Level and Location for Isolated Columns (upto SOG only) for Large Mosque (axis C-3, C-4, C1-2, C1-5, D-1
Inspection and compaction test 1st layer for backfilling of Strip Footing and PC between PC 146-148-150
Inspection and compaction test 5th layer for backfilling of PC and Stripfooting PC 105-107-109 Zone 2C (
Inspection and compaction test 4th layer for backfilling of MCPE 3 (as highlighted) Zone 2E (4th of 4th
Inspection and compaction test 4th layer for backfilling of MCPE 1 (as highlighted) Zone 2M 2N (4th of
Inspection and compaction test 5th layer for backfilling of MCPE 1 (as highlighted) Zone 2M 2N (5th of
Inspection of alignment for installated baseplate in crescent 2 Zone 3, 2M inner (as per attached)
Shuttering and Shear Connectors for BUTTRESS BOI 61 (2ND) Zone 2A
Concreting for BUTTRESS BOI 61 (2ND) Zone 2A
Concreting of Slab FOUNDATION of TUNNEL 1 part C (as highlighted) Zone 2H
Concreting for Isolated Columns (upto SOG only) for Large Mosque (axis C-3, C-4, C1-2, C1-5, D-1.1, D-2,
Concreting for RING BEAM Zone 2B (INNER) Axis 02-1, 02D to 02G (as highlighted)
Concreting for Promenade Abutment Blinding at Zone 4 Grid P (as highlighted)
Steel Reinforcements of Slab of TUNNEL 1 part C (as highlighted) Zone 2H
Shuttering of Slab of TUNNEL 1 part C (as highlighted) Zone 2H
Steel Reinforcements and shear connector above Infill wall for RING BEAM Zone 2B (Outer) Axis 02-2, 0
Shuttering for Isolated Columns (upto SOG only) for Large Mosque (axis C-3, C-4, C1-2, C1-5, D-1.1, D-2,
Installation of straight UPVC Conduit (Dia.25mm) and Seceurity (CAM) at Buttress Axis (01/1W) Cres
Coordinates & Levels for Stair Core Wall (upto Bottom of Slab), at Grid (G-F/8) at Management Buildi
Coordinates & Levels for Footing at Grid (A/5-14 & A-B/14) @ Butterfly Garden, at highlighted area i
Concrete Pouring & Shuttering for Stair Core Wall (upto Bottom of Slab), at Grid (G-F/8) at Manageme
Coordinates & Levels for Blinding under Electrical Low Voltage Handholes (16 no's), (MH/ZG/LV/1 to
Coordinates & Levels of Blinding under Foundations (16 no's) at Grid (A & B/1-8) of Canopy at New Ti
Excavation & Soil preparation for Foundations (16 no's) at Grid (A & B/1-8) of Canopy at New Ticketin
Gravel 3/8 Bedding & Geotextile Surround for Sub surface Pipes (110mm) Connecting to Gully Inside B
Inspection of Concrete Pouring for the Duct Bank of MV Line from K/MV04 to L/MV/08 at Zone-K & L (As
Inspection of Formwork for the Duct Bank of MV Line from K/MV04 to L/MV/08 at Zone-K & L (As Highli
Inspection of Steel Reinforcement for the Duct Bank of MV Line from K/MV04 to L/MV/08 at Zone-K & L
Inspection of Backfilling Sub-grade (above Gravel) 2nd Layer (2 out of 4) around the Manhole for FW
Inspection for Casting the Concrete encasement and Surface Preperation prior to start waterproofing a
Inspection for Installation Of Isolation Fire Water Line Pit K/F/01, K/F/03 - as highlighted
Inspection of Backfilling Sub-grade 1st Layer (1 of 3) For Storm Water Line Above Warning Tape Fr
Inspection for Casting the Blinding Concrete under the Foundation of SBC-05 -Wing Wall (as Highlighted
Inspection and Compaction Test for 3rd Layer (3 of 4) backfilling (grading) at Zone - F (Near RB-244) as
Excavation for Fire & Security Distribution Line from (C/FS/08 to G/FS/33) including Branch and Pit C/
"Excavation for Telecommunication Line between C/TL/15 to G/TL/29) including branch and pit C/TL/15,
Inspection and Compaction Test for backfilling 1st Layer (1 of 1) to cover the GreenTiles beside & ab
Excavation for Fire & Security Distribution Line from G/FS/19 to G/FS/44, including Pit G/FS/19, G/FS/2
Excavation for Telecommunication Line between G/TL/16 to G/TL/27 including pit G/TL/16, G/TL/41, G/
Excavation for Foul Water Line Branch from FW-A-13-5 prior to start Gravel Bedding (for 14.40m as High
Inspection and compaction test 5th layer for backfilling of Strip Footing and PC between PC 14-16 (5th
Inspection and compaction test 2nd layer for backfilling of MCPE 1 (as highlighted) Zone 2M 2N (2nd of
Inspection and compaction test 3rd layer for backfilling of MCPE 1 (as highlighted) Zone 2M 2N (3rd of
Concreting for Blinding of Retaining Wall of Zone 4 axis 01M to 01K
Two layers of 4mm thgick modified bituminous waterproofing membrane under Foundation of MCPE 4
Surface Preparation and Base Primer Coating for Strip Footing of Large Mosque (as highlighted) Zone 2G
Installation of straight UPVC conduit (Dia.25mm) and Box for Fire Alarm (Speaker) at Buttress Axis (0
Installation of straight UPVC conduit (Dia.32mm) for Power (Socket Outlet) at Buttress Axis (01/2Z) C
Installation of straight UPVC conduit (Dia.32mm) for Power (Socket Outlet) at Buttress Axis (01/2Y) C
Installation of straight UPVC conduit (Dia.32mm) for Power (Socket Outlet) at Buttress Axis (01/2X) C
Installation of straight UPVC conduit (Dia.32mm) for Power (Socket Outlet) at Buttress Axis (01/1W)
Installation of straight UPVC conduit (Dia.25mm) and Voice and Data (WIFI & CAM) at Buttress Axis
Steel Reinforcements for BUTTRESS BOI BOV 22, 23, 24, 25, 26, 27, 28, 29, 30 Zone 1F 1G, 1H
'Warning Tape Installation of Fire Fighting Networks for (160, 200 & 250mmØ-UPVC-Class-5). As per
'Fire Fighting Networks Sand Cover & Pipes Protection (30 cm above Pipes). As per highlighted Area
Pipe Installation of Sub-Surface Drainage (Main Line & Branches) Pipes; (110mmØ, UPVC-CLASS-4); A
Concrete Pouring & Shuttering for Footing at Grid (A/5-14 & A-B/14) @ Butterfly Garden, at highlight
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 3 layers) along the (Remain
2nd Coat Damp proofing for Footings (6 no's) of Canopy Inside Physic Garden, at highlighted area in
Inspection & Compaction tests after Excavation for Electrical Low Voltage Handholes (16 no's), (MH/
Excavation & Soil preparation for Electrical Low Voltage Handholes (16 no's), (MH/ZG/LV/1 to MH/ZG/
Stack Boulders Installed layer upto Level +879.00, at Bottom Left Side of Geyser Garden, As Highlight
Stack Boulders Installed Layer at levels +872.80 & +873.20, along Open Channel, (Part 1), at Boat Gar
Stack Boulders Installed layer at Level +877.10, at Left Side Water Play Garden (Part 2), As Highlight
Stack Boulders Installed Layer at Level +878.00, at 4th line, at Left Side of Water Play Garden (Part 2
Installation of Rock and Boulder No. RB-140 (Wadi Area) - Additional Flower Beds, Steps and 1 to 8 La
Installation of Rock and Boulder No. RB-167 (Wadi Area) - Flower Beds, Steps for Completion, as per
"Inspection and Compaction Test for backfilling 1st Layer (1 of 1) to cover the GreenTiles beside & ab
Inspection and Compaction Test for backfilling 1st Layer (1 of 2) to cover the GreenTiles above the p
Inspection and Compaction Test for backfilling 1st Layer (1 of 2) to cover the GreenTiles above the pip
Stack Boulders Installed layers at Level +877.77, at Bottom Right Side of Geyser Garden, As Highlight
Inspection and Compaction Test for backfilling 1st Layer (1 of 1) to cover the GreenTiles above the p
Inspection and Compaction Test for backfilling 1st Layer (1 of 1) to cover the GreenTiles above the pip
Excavation for Potable Water Line at Zone-B including branch and Pit B/PW/05 - as highlighted in the a
"Excavation for Fire Water Line at Zone-B including branch and Pit B/F/04 as highlighted in the attache
Stack Boulders Installed Layer upto Level +878.50, at Left Side of Mist Garden (Part 1), At Highlighte
Inspection and Compaction Test of Backfilling Sub-grade above Gravel - 3rd Layer (3 out of 4) aroun
Inspection for application of Protection Board on top of Damp Proofing for External wall and Top Slab o
Stack Boulders Installed 1st & 2nd layers (Remaining) at Step 3 & 4, at levels +875.97, +876.27, +876
Stack Boulders Installed layer at Level +880.50, (Part 4) along Planted Bed 2 to 3 and above, Inside
Level and Location for Mass Concrete of Strip Footing Between PC 131 - 133 Zone 2F
Level and Location for Excavation for Strip Footing Between PC 150 - 152 Zone 2J
Level and Location for Mass Concrete of Strip Footing Between PC 150 - 152 Zone 2J
Level and Location for BUTTRESS BIV 22, 23, 24, 25 Zone 1F 1G
Anti Termite application under Mass Concrete of Strip Footing Between PC 131 - 133 Zone 2F
Shuttering for Mass Concrete of Strip Footing Between PC 131 - 133 Zone 2F
Concreting for Mass Concrete of Strip Footing Between PC 131 - 133 Zone 2F
Anti Termite application under Mass Concrete of Strip Footing Between PC 150 - 152 Zone 2J
Shuttering for Mass Concrete of Strip Footing Between PC 150 - 152 Zone 2J
Concreting for Mass Concrete of Strip Footing Between PC 150 - 152 Zone 2J
Steel Reinforcements of Wall for Tunnel 1 (as Highlighted) Zone 2H
Shuttering and Shear Connectors for BUTTRESS BIV 22, 23, 24, 25 Zone 1F 1G
Concreting for BUTTRESS BIV 22, 23, 24, 25 Zone 1F 1G
Surface Preparation and Solvent Base Primer under Retaining Wall (as Highlighted) ZONE 1D Axis 01M t
Inspection and Compaction Test for backfilling Sub-Base under Boulder No. RB-137 (Stock Pile # 110 A-1
Geotextile sheet and 50mm Screed under Strip footing between PC 146-148-150 Zone 2J (as Highlighted
Single layer of 4mm thick modified bituminous water proofing membrane under Strip footing between
Surface preparation and Solvent base Primer under Strip footing between PC 146-148-150 Zone 2J (as H
Stack Boulders Installed Layer at Level +880.00, at Bottom side of Water Play Garden along Aviary Wal
Inspection of Plastering of walls Inside Entrance Lobby (GF-5068), at Grid between (3-4/R-V), at Man
Inspection of Spatter Dash (Rough Coat) Prior to Plastering of walls Inside Showers (GF-5058) at Gri
Steel Reinforcement for Footing at Grid (A/5-14 & A-B/14) @ Butterfly Garden, at highlighted area in
Single layer 4mm thk Modified Bituminous Water Proofing Membrane for foundation & Kickers of Boun
Inspection & Compaction tests Prior to Blinding under Circular Walls (Remaining part), inside Maze ga
Stack Boulders Installed Layer at Level +877.50, at 4th line, at Left Side of Water Play Garden (Part 2
Stack Boulders Installed Layers upto Levels +877.60 & +878.00, at Left Side of Planted Bed 3, at 3rd l
Stack Boulders Installed Layer upto Level +879.00, at Left Side of Mist Garden (Part 1), At Highlighte
Stack Boulders Installed Layer at Level +879.00, at Right Side of Mist Garden (Part 2), At Highlighted
Stack Boulders Installed layers upto Levels +878.50, +879.00 & +879.50, at Right Side of Water Play
Pipes Sand Cover and Protection of Potable Water Networks for (200mmØ-UPVC-Class-5). As per high
Pipes Sand Cover and Protection of Potable Water Networks for (200mmØ-UPVC-Class-5). As per high
Fire Fighting Networks Sand Cover & Pipes Protection (30 cm above Pipes). As per highlighted Area i
Warning Tape Installation of Fire Fighting Networks for (160 & 250mmØ-UPVC-Class-5). As per highli
Fire Fighting Networks Sand Cover & Pipes Protection (30 cm above Pipes). As per highlighted Area i
Warning Tape Installation of Potable Water Networks for (50 & 200mmØ-UPVC-Class-5). As per highli
Potable Water Networks Sand Cover & Pipes Protection (30 cm above Pipes). As per highlighted Area
Warning Tape Installation of Foul Water Line for (315mmØ - UPVC- Class 4) from (FW-A-09 to FW-A-1
300 mm Gravel 3/8" Backfilling and Geotextile of Foul Water Line for (315mmØ - UPVC- Class 4) fro
Warning Tape Installation of Potable Water Networks for (50 & 200mmØ-UPVC-Class-5). As per highli
Potable Water Networks Sand Cover & Pipes Protection (30 cm above Pipes). As per highlighted Area
Inspection And Compaction Test of Backfilling Sub-Grade Above Gravel 1st Layer (1 of 2) For Manhole
"Inspection And Compaction Test Of Backfilling Sub-grade Above Gravel 1st Layer (1 of 3) For Manh
"INSPECTION FOR INSTALLATION OF GULLIES FOR - G-H-01, G-H-02, G-H-03 G-H-04, G-H-05, G-H-06, G-H-
Inspection and Compaction Test for backfilling 1st Layer (1 of 1) to Protect the Sand Covering Layer o
Surface Preparation prior to start backfilling Sub-grade to Protect the Sand Covering Layer of Telecom
"Inspection for the Excavation and Soil Preparation of Storm Box Culvert - SBC-05 - Wing Wall (As Highl
Inspection of waterproofing for Duct Bank of Fire & Security line from G/FS/33 to near H/FS/06 at Zone-
Inspection of Waterproofing for Duct Bank of Telecommunications line from G/TL/29 to near H/TL/06 at
Surface Preparation prior to strart waterproofing for Duct Bank of Fire & Security line from G/FS/33 to
Surface Preparation prior to start waterproofing for Duct Bank of Telecommunications line from G/TL/2
Inspection of Sand Bedding under pipe for Fire Water Line at Zone-F & G including branch - as highlight
Inspection of Sand Bedding under pipe for Potable Water Line at Zone-F & G including branch - as highl
Inspection of Sand bedding under pipe for Fire Water Line at Zone-K as highlighted in the attached draw
Level and Location for Excavation for Strip Footing Between PC 131-133 Zone 2F
Level and Location for BUTTRESS BOI 59, 60 (1st with beam) Zone 2A
Level and Location for Mass Concrete of Strip Footing Between PC 17 - 19 (3RD Layer)Zone 1C
Inspection and compaction test 1st layer for backfilling of MCPE 1 (as highlighted) Zone 2M 2N (1st of 6
Concreting for Mass Concrete of Strip Footing Between PC 17 - 19 (3rd Layer)Zone 1C
Shuttering for Mass Concrete of Strip Footing Between PC 17 - 19 (3rd Layer)Zone 1C
Concreting for BUTTRESS BOI 59, 60 (1st with beam) Zone 2A
Shuttering and Shear Connectors for BUTTRESS BOI 59, 60 (with beam) Zone 2A
Installation of straight UPVC ducts (Dia 6 inch) Mediam Voltage (4X160mm) between manhaole # G
Installation of straight UPVC ducts (Dia 6 inch) Mediam Voltage (4X160mm) between manhaole # G
1st Coat Damp proofing for Footings (6 no's) of Canopy Inside Physic Garden, at highlighted area in a
Primer Coat prior to Damp proofing for Footings (6 no's) of Canopy Inside Physic Garden, at highlight
Soil preparation Prior to Backfilling Between 2 Straight Walls and at Entrance, inside Maze garden, (
Solvent Base Primer Coating prior to Membrane waterproofing for foundation & Kickers of Boundary w
Inspection of alignment for installated baseplate in crescent 2 Zone 3 2N outer (as per attached)
Level and Location for Strip Footing between PC 146-148-150 Zone 2J
Inspection for Laying of Green Tiles above the pipe for Telecommunication Line from K/TL/14 to K/TL/11
Level and Location for Promenade Abutment Blinding at Zone 4 Grid P (as highlighted)
Inspection of Thrust Block for UPVC Pipe (200 mm Dia) for Fire Water Line at Zone- B - As Highlighted i
Concreting for Strip Footing between PC 146-148-150 Zone 2J
Steel Reinforcements for Isolated Foundation Column upto Slab on Grade Level for Large Mosque ZONE 1
Steel Reinforcements for MCPE 1 WALL (INNER) at axis 03R to 03S Zone 2M 2N (as highlighted)
Surface Preparation and Solvent Base Primer for MCPE 3 Wall (as Highlighted) ZONE 2E Axis 03-1 to 03-2
Two layer of 4mm thick modified bituminous waterproofing memmbrane for MCPE 3 Wall (as Highlighte
Protection layer of 4mm thick bituminous protection board for MCPE 3 Wall (as Highlighted) ZONE 2E Ax
Surface Preparation and Base Primer Coating for Isolated Footing of Large Mosque (as highlighted) Zon
Shuttering for Promenade Abutment Blinding at Zone 4 Grid P (as highlighted)
Steel Reinforcements for Strip Footing between PC 146-148-150 Zone 2J
Shuttering for Strip Footing between PC 146-148-150 Zone 2J
"Inspection of Thrust Block for UPVC Pipe (200mm) for Potable Water Line at Zone-B - As Highlighted i
"Inspection of Backfilling Sub Grade Above Gravel (1ST Layer out of 8) around the Manhole And Gulli
Inspection for Casting the Concrete encasement and Surface Preperation prior to start waterproofing a
Inspection for Installation Of Isolation Fire Water Line Pit F/F/09, K/F/02 as highlighted
Inspection of Backfilling Gravel 2nd Layer (2 of 2) For Manhole MH-G-05 AS Highlighted SP#118)
INSPECTION OF INSTALLATION OF ALL RINGS (RAISER) AND SLAB FOR FW-A-12, (AS ATTACHED)
"Inspection For Manhole Base Installation And UPVC Pipe Connection For FW-A-12 as highlighted "
"Surface Preperation prior to start backfilling Gravel around the Gullies for (G-G-28, G-G-29, G-G-30 ) -
Pipe Installation of Fire Fighting Networks for (160 & 250mmØ-UPVC-Class-5). As per highlighted Are
Pipe Installation of Potable Water Networks for (50 & 200mmØ-UPVC-Class-5). As per highlighted Are
Inspection & Compaction tests of 5th Layer Backfilling (Sub-Grade) (Out of 7 layers) along the Walls (O
Coordinates & Levels of Footing of Plant Room at Physic Garden, at highlighted area in attached draw
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 3 layers) along the (Remain
Concrete pouring for Blinding of Circular Walls (Remaining part), inside Maze garden, as highlighted a
Inspection and Compaction Test For Backfilling Subgrade 2ndt Layer (2 of 4) for Storm Water Line Fr
Inspection and Compaction Test For Backfilling Subgrade 2nd Layer (2 of 4) for Storm Water Line Fro
Excavation for Fire Water Line at Zone-F & G including branch and Pit F/F/08, F/F/03, F/F/11, G/F/06,
Excavation for Potable Water Line at Zone-F &G including branch and Pit F/PW/03, F/PW/13, F/PW/14,
Inspection and Compaction Test of Backfilling Sub-grade above Gravel - 2nd Layer (2 out of 4) aroun
Inspection of Sand Covering Layer for Protection of Fire & Security Distribution Line from (G/FS/46 to
Inspection of Sand Covering Layer for Protection of Telecommunications Line from (G/TL/45 to K/TL/20
Inspection of Sand bedding for Potable Water Line at Zone-K as highlighted in the attached drawing (Sto
Surface Preparation prior to start Water Proofing for Canopy Foundation of Seating Area (1) Zone-G (SA-
Inspection for Laying of Red Tiles above the pipe for MV Line from G/MV/13 to L/MV/08 at Zone-G,K&L
Inspection of Sand Covering Layer for Protection of MV Line from (G/MV/05 to G/MV/12) at Zone-G as h
Steel Reinforcements for Foundation for Tunnel 1 (as Highlighted) Zone 2H
Inspection and compaction test 3rd layer for backfilling of MCPE 3 (as highlighted) Zone 2E (2nd of 4th
Inspection and compaction test 4th layer for backfilling of Strip Footing and PC between PC 14-16 (4th
Installation and Survey Report for Location and Levels of Anchor Bolts for RING BEAM (INNER) Axis 02-
Level and Location for RING BEAM Zone 2B (INNER) Axis 02-1, 02D to 02G (as highlighted)
Steel Reinforcements for RING BEAM Zone 2B (INNER) Axis 02-1, 02D to 02G (as highlighted)
Shuttering for RING BEAM Zone 2B (INNER) Axis 02-1, 02D to 02G (as highlighted)
Surface Preparation prior to Waterproofing for Footings & Upstands (6 no's) of Canopy Inside Physic
Soil preparation prior to Backfilling along the Plant room (Outer Side), (At B.O.B Level +877.32), at D
"Inspection of Grouting (Horizontal Joints) for Rock Boulder - RB-270 for All Layers"
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 4 layers) along the Bounda
Single layer 4mm thk Modified Bituminous Water Proofing Membrane for foundation & Kickers of Boun
Surface Preparation prior to Waterproofing for Floor area Inside Disabled Toilet (GF-5046), Toilets
Plaster Guide Points & Accessories for Plastering of walls Inside Showers (GF-5058) at Grid between
"Inspection of Grouting (Vertical Joints) for Rock Boulder - RB-270 for All Layers"
Installation of Rock and Boulder No. RB-270 - 4th Layer (4 of 4)
Stack Boulders Installed layers upto Levels +877.10 & +878.50, at Bottom Left Side of Geyser Garden,
"Inspection of Backfilling Gravel 1st Layer (1 of 3) For Manholes And Gullies MH-G-03-01, MH-G-0
Inspection for application of Damp Proofing (1st Coat & 2nd Coat) on top of Primer for External Wall an
Inspection and Compaction Test for 2nd Layer (2 of 4) backfilling (grading) at Zone - F (Near RB-244) as
Pipe Installation of Foul Water Line for (315mmØ - UPVC- Class 4) from (FW-A-09 to FW-A-12). At CR
Bedding of Gravel 3/8" and Geotextile Surrounding Foul Water Line for (315mmØ - UPVC- Class 4) fr
Warning Tape Installation of Strom Water Line OUTFAL-G for (315mmØ-UPVC Pipes-Class 4) from ( Cat
300 mm Gravel 3/8" Backfilling and Geotextile for Strom Water Line OUTFAL-G for (315mmØ-UPVC Pipe
Warning Tape Installation of Foul Water Line for (110mmØ - UPVC- Class 4) from (FW-A-13.5 to CEN
300 mm Gravel 3/8" Backfilling and Geotextile for Foul Water Line for (110mmØ - UPVC- Class 4) f
Inspection and compaction test 3rd layer for backfilling of Strip Footing and PC between PC 14-16 (3rd
Inspection and compaction test 2nd layer for backfilling of MCPE 3 (as highlighted) Zone 2E (2nd of 4th
Surface Preparation Prior to start Backfilling at MCPE 1 Zone 2M 2N axis 03S to 02P (as highlighted)
Level and Location for BUTTRESS BII 60 (2nd) Zone 2A
Level and Location for BUTTRESS BII 59 (1st with beam) Zone 2A
Level and Location for Strip Foundation for Large Mosque ZONE 1G (as highlighetd)
Level and Location for BUTTRESS BOI 82, 83 (with beam) Zone 2F
Shuttering and Shear Connectors for BUTTRESS BII 60 (2nd) Zone 2A
Concreting for BUTTRESS BII 60 (2nd) Zone 2A
Shuttering and Shear Connector for BUTTRESS BII 59 (1st with beam) Zone 2A
Concreting for BUTTRESS BII 59 (1st with beam) Zone 2A
Steel Reinforcements for Strip Foundation for Large Mosque ZONE 1G (as highlighetd)
Shuttering for Strip Foundation for Large Mosque ZONE 1G (as highlighetd)
Concreting for Strip Foundation for Large Mosque ZONE 1G (as highlighetd)
Shuttering and Shear Connectors for BUTTRESS BOI 82, 83 (with beam) Zone 2F
Concreting for BUTTRESS BOI 82, 83 (with beam) Zone 2F
"Surface Preparation Prior to Start Backfilling Gravel For Manholes MH-G-01-07, MH-G-01-06, MH
"Inspection of Grouting (Horizontal Joints) for Rock Boulder - RB-256 for All Layers"
"Inspection of Grouting (Vertical Joints) for Rock Boulder - RB-256 for All Layers"
Installation of Rock and Boulder No. RB-270 - 3rd Layer (3 of 4)
Installation of Rock and Boulder No. RB-270 - 2nd Layer (2 of 4)
"Inspection of Grouting (Vertical Joints) for Rock Boulder - RB-137 for All Layers"
Inspection and Compaction Test for backfilling 1st Layer (1 of 1) to cover the GreenTiles above the p
Inspection and Compaction Test for backfilling 1st Layer (1 of 1) to cover the GreenTiles above the pip
Inspection and Compaction Test for backfilling 1st Layer (1 of 2) to cover the GreenTiles above the p
Inspection and Compaction Test for backfilling 1st Layer (1 of 2) to cover the GreenTiles above the pip
Inspection for application of Primer (1 Coat) on External Wall and Top Slab of SBC-01 - Transition Area (
"Inspection of Backfilling Gravel 1st Layer (1 of 2) For Manholes And Gullies MH-G-01, MH-G-01-01 a
Inspection of Concrete Pouring for Canopy Foundation of Seating Area (1) Zone-K (SA-14) - As Highlight
Inspection of Formwork for Canopy Foundation of Seating Area (1) Zone-K (SA-14) - As Highlighted
"Inspection And Compaction Test of Backfilling Sub-grade Above Gravel 1st Layer (1 out of 4) around
"Inspection of Backfilling Gravel 1st Layer (1 out of 4) around the Manhole for MH-D-08 as Highlighted
INSPECTION OF INSTALLATION OF ALL RINGS (RAISER) AND SLAB FOR FW-A-10, FW-A-11 (AS ATTACHED)
"Inspection For Manhole Base Installation And UPVC Pipe Connection For FW-A-10, FW-A-11 as highlight
Inspection of Steel Reinforcement for Canopy Foundation and Column Neck of Seating Area (1) Zone-K (S
Inspection for Laying of GreenTiles above the pipe for Fire & Security Distribution Line from K/FS/23 to
Inspection for Laying of Green Tiles above the pipe for Telecommunication Line from K/TL/09 to K/TL/1
Inspection of Reinforced Concrete Pouring for the Duct Bank of MV Line from B/MV/06 to B/MV/12 at Z
Inspection of Formwork for the Duct Bank of MV Line from B/MV/06 to B/MV/12 at Zone-B (As Highligh
Inspection of Steel Reinforcement for the Duct Bank of MV Line from B/MV/06 to B/MV/12 at Zone-B (A
Inspection of Thrust Block for UPVC Pipe (200 & 250mm Dia) for Fire Water Line at Zone- B & C - As Hig
Inspection of Reinforced Concrete Pouring for the Duct Bank of MV Line from B/MV/16 to B/MV/06 at Z
Inspection of Formwork for the Duct Bank of MV Line from B/MV/16 to B/MV/06 at Zone-B (As Highligh
Inspection of Steel Reinforcement for the Duct Bank of MV Line from B/MV/16 to B/MV/06 at Zone-B (A
Inspection and compaction test of Backfilling Sub Grade (1st Layer out of 4) around gullies G-F-42, G-F
Surface Preparation Prior to start Backfilling at Strip footing & PC between PC 146-148-150 Zone 2J (as
Inspection and compaction test 2nd layer for backfilling of Strip Footing and PC between PC 14-16 (2nd
Inspection and compaction test 1st layer for backfilling of MCPE 3 (as highlighted) Zone 2E (1st of 4th l
Inspection and compaction test 4th layer for backfilling of PC and Stripfooting PC 105-107-109 Zone 2C (
Inspection and compaction test 6th layer for backfilling for Zone 1P (as highlighted) Zone 1P SP#124 (6 of
Inspection and compaction test 1st layer for backfilling of Strip Footing and PC between PC 14-16 (1st o
Level and Location for Excavation for Promenade Bridge Abutment at Grid P(as highlighted)
Level and Location for Foundation for Tunnel 1 (as Highlighted) Zone 2H
Level and Location for Excavation for Retaining Walls for Zone 4 Axis 01K - 01I (as highlighted)
Shuttering Foundation for Tunnel 1 (as Highlighted) Zone 2H
Concreting of Foundation for Tunnel 1 (as Highlighted) Zone 2H
Excavation & Soil Preparation for Culvert (Part 1) along Boat Garden, Inside Water Garden, at highlig
Inspection of Render (External) Plastering for Windows opennings (41 No's), at Management Building,
Inspection of Plastering of walls Inside Disabled Toilet (GF-5046), Toilets Entrance & Wash basins a
2nd Coat Bitumenous Damp proofing for Footing & Kickers of Plant Room (Outer Sides) at Discovery G
1st Coat Bitumenous Damp proofing for Footing & Kickers of Plant Room (Outer Sides) at Discovery Ga
Primer Coating Prior to Bitumenous Damp proofing for Footing & Kickers of Plant Room (Outer Sides)
Soil preparation prior to Backfilling along the (Remaining) Boundary wall (All Side), (At B.O.B Level +
Steel Reinforcement for Footing & Kicker of Plant Room at Physic Garden, at highlighted area in atta
Concrete Pouring for Blinding under foundation at Grid (A/6-16) @ Butterfly Garden, at highlighted a
Installation of Rock and Boulder No. RB-270 - 1st layer (1 of 4)
"Inspection of Grouting (Horizontal Joints) for Rock Boulder - RB-134 for All Layers"
"Inspection of Grouting (Vertical Joints) for Rock Boulder - RB-134 for All Layers"
"Inspection of Grouting (Vertical Joints) for Rock Boulder - RB-135 for All Layers"
"Inspection of Grouting (Horizontal Joints) for Rock Boulder - RB-136 for All Layers"
"Inspection of Grouting (Vertical Joints) for Rock Boulder - RB-136 for All Layers"
"Inspection of Grouting (Horizontal Joints) for Rock Boulder - RB-137 for All Layers"
Installation of UPVC conduit (stub-up & straight Dia. 25mm) for Voice and Data (WIFI) at Sound & Ligh
Installation of straight UPVC Conduit (Dia.25mm) and Box for Voice and Data (WIFI) at the Sound and L
Inspection for Laying of GreenTiles above the pipe for Fire & Security Distribution Line from K/FS/23 t
Inspection for Laying of Green Tiles above the pipe for Telecommunication Line from K/TL/09 to K/TL/10
Excavation for Potable Water Line at Zone-K as highlighted in the attached drawing
Inspection And Compaction Test For Backfilling 2nd Layer (2 of 4) Around Gullies G-F-31, G-F-34, G-F-38
Inspection and Compaction Test For Backfilling Subgrade 1st Layer (1 of 4) for Storm Water Line Fro
Inspection and Compaction Test For Backfilling Subgrade 1st Layer (1 of 4) for Storm Water Line Fro
Inspection and Compaction Test For Backfilling Subgrade 2nd Layer (2 of 3) for Storm Water Line Fro
Inspection and Compaction Test For Backfilling Subgrade 3rd Layer (3 of 5) for Storm Water Line Fro
Inspection for Installation Of Isolation Potable Water Line Pit F/F/05, F/F/06, F/F/07, G/F/05 - as highlig
"Inspection of Backfilling Gravel 3rd Layer (3 out of 3) around the Manhole for MH-A-01 - as Highlighte
Inspection and Compaction Test For Backfilling Subgrade 2nd Layer (2 of 3) for Storm Water Line Fro
Excavation for Fire Water Line at Zone-K as highlighted in the attached drawing
Inspection & Compaction tests of 4th Layer Backfilling (Sub-Grade) (Out of 7 layers) along the Walls (O
Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Grade) (Out of 5 layers) along the Walls (O
Screed Protection 50mm thick on Blinding under foundation at Grid (A/8) @ Butterfly Garden, at high
Screed Protection 50mm thick on Blinding of Internal foundations, Inside Butterfly Garden, at highlig
Geo Textile Sheet on Blinding under foundation at Grid (A/8) @ Butterfly Garden, at highlighted area
Geo Textile Sheet on Blinding of Internal foundations, Inside Butterfly Garden, at highlighted area in
Single layer 4mm thk Modified Bituminous Water Proofing Membrane on Blinding of Internal foundation
Level and Location for Blinding of Retaining Wall (Shearkey) of Zone 4 axis 01M to 01K
Concreting for Blinding of Retaining Wall (shearkey) of Zone 4 axis 01M to 01K
Shuttering for Blinding of Retaining Wall (shearkey) of Zone 4 axis 01M to 01K
Surface Preparation Prior to start Backfilling at MCPE 3 Zone 2E axis 03A, 03-2 to 03-1 (as highlighted)
Inspection and compaction test 8th layer (subgrade) for backfilling at MCPE 3 Zone 2E 2F (as highlighted
Stack Boulders Installed Layer at level +876.27, At Bottom Left Side of Mist Garden, At Highlighted a
Stack Boulders Installed layers at Levels +877.07 & +877.47, at 2nd line of 'L' shape boulders, at Bo
Stack Boulders Installed layer at Level +880.00, (Part 4) along Planted Bed 2 to 3 and above, Inside
Stack Boulders Installed Layers upto Levels +877.50, +878.00 & +878.50 at Left Side of Mist Garden (P
Stack Boulders Installed Layers upto Levels +878.50, +879.00, +877.50 & +878.00 at Top & Left Side of
Stack Boulders Installed layer upto Level +878.00, at Bottom Left Side of Geyser Garden, As Highlight
Pipe Installation for Showres Drain ( 50, 75mmØ - CI Pipe) According to the Last Approved ARCH Dra
Installation of straight UPVC Duct Bank (4x110 mm) for Low Current (Telecom Communication TC) fro
Steel Reinforcement for Stair Core Wall, Grid (G-F/8) at Management Building, As Highlighted in Att
Solvent Base Primer Coating prior to Membrane Waterproofing on Blinding of Internal foundations, Ins
Surface Preparation Prior to Water proofing on Blinding of Internal foundations, Inside Butterfly Gard
Single layer 4mm thk Modified Bituminous Water Proofing Membrane on Blinding under foundation at
Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Grade) (Out of 7 layers) along the Walls (O
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 4 layers) along the Bounda
Inspection & Compaction Tests of First Layer Sub Grade Backfilling Between Circular Walls 2&3, 3&4, 4
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 5 layers) along the Walls (
Geo-textile on Blinding Under the Foundation of Plant Room at Physic Garden, at highlighted area in
Protection Layer 4mm thk Bituminous Protection Board for Waterproofing on Blinding Under the Found
Single layer 4mm thk Modified Bituminous Water Proofing Membrane on Blinding Under the Foundatio
Stack Boulders Installed layer at Level +877.47, at Bottom Right Side of Geyser Garden, As Highlighte
Stone Coping on walls at 3 Straight Walls, Circular wall 1 and 2 Curved Walls at Entrance of Maze gard
Stack Boulders Installed Layers at Levels, +878.50 & +879.00, at Bottom side of Water Play Garden al
Concrete Pouring & Shuttering for Footings & Upstands (6 no's) of Canopy Inside Physic Garden, at hi
Stack Boulders Installed layer upto Levels +878.00, at Left Side of Planted Bed 3, Inside Water Play G
Stack Boulders Installed Layer (At level +878.00) at Bottom Right Side of Mist Garden, At Highlighted
Stack Boulders Installed layers at Levels +875.20, +876.20 & +876.60, at Left Side Water Play Garden
Stack Boulders Installed layer upto Level +877.60, at Bottom Left Side of Geyser Garden, As Highlight
Installation of Rock and Boulder No. RB-134 - 3rd layer (3 of 4)
Installation of Rock and Boulder No. RB-134 - 2nd layer (2 of 4)
Installation of Rock and Boulder No. RB-135 - 4th Layer (4 of 4)
Installation of Rock and Boulder No. RB-135 - 3rd Layer (3 of 4)
Inspection of Sand Bedding under pipe for Telecommunication Line from K/TL/01 to K/TL/21) at Zone-K
Inspection of Sand Bedding under pipe for Fire & Security Distribution Line from (K/FS/01 to K/FS/13)
Inspection and Compaction Test for backfilling 2nd Layer (2 of 2) to cover the GreenTiles above the p
Installation of straight UPVC Duct Bank (2x110 mm) for Low Current (FS) G/RC-FS/46 to G/RC-FS/20
Installation of straight UPVC Conduit (4x110mm) for TELECOM Duct Bank (DB no.KK/D-TL/28 Manhole no
Installation of straight UPVC Conduit (Dia.160mmx4) Medium Voltage Ductbank no. KL/D-MV/02 (from
Installation of straight UPVC ducts (4x160mm) Medium Voltage Duct bank no. BB/D-MV/05 from Manho
Inspection of Alignment for Installed Baseplates in Crescent 2 Zone 2N inner
Inspection and Compaction Test for backfilling 2nd Layer (2 of 2) to cover the GreenTiles above the pi
Level and Location for Isolated Foundation for Large Mosque (axis C-3, C-4, C1-2, C1-5, D-1.1, D-2, D-3,
Inspection and Compaction Test For Backfilling Subgrade 2nd Layer (2 of 5) for Storm Water Line Fro
Level and Location for BUTTRESS BOI 61 (with beam) Zone 2A
"Excavation for Potable Water Line branch at Zone-F including Pit - F/PW/06 - as highlighted "
Level and Location for Mass Concrete of Strip Footing Between PC 17 - 19 (2nd Layer)Zone 1C
"Excavation for Fire Water Line branch at Zone-F including Pit - F/F/09 - as highlighted "
Inspection and Compaction Test for 1st Layer (1 of 4) backfilling (grading) at Zone - F (Near RB-244) as
Level and Location for BUTTRESS BOV & BIV 59 (2nd) Zone 2A
"Inspection of Backfilling Gravel 2nd Layer (2 out of 2) around the Manhole for MH-A-01 - as Highlighte
Inspection of Backfilling Gravel 2nd Layer (2 out of 5) around the Manhole for MH-A-02, MH-A-10 as Hi
Concreting for Isolated Foundation for Large Mosque (axis C-3, C-4, C1-2, C1-5, D-1.1, D-2, D-3, D-4, D-5
Inspection of Sand Covering Layer for Protection of MV Line from (G/MV/13 to K/MV/01) at Zone-G&K a
"Excavation for Storm Water Line from MH-M-11 to MH-M-09 including Manhole MH-M-10, MH-M-09 -
Shuttering for Isolated Foundation for Large Mosque (axis C-3, C-4, C1-2, C1-5, D-1.1, D-2, D-3, D-4, D-5
Steel Reinforcements for Isolated Foundation for Large Mosque (axis C-3, C-4, C1-2, C1-5, D-1.1, D-2, D-
Shuttering and Shear Connectors for BUTTRESS BOI 61 (with beam) Zone 2A
Concreting for BUTTRESS BOI 61 (with beam) Zone 2A
Shuttering for Mass Concrete of Strip Footing Between PC 17 - 19 (2nd Layer)Zone 1C
Concreting for Mass Concrete of Strip Footing Between PC 17 - 19 (2nd Layer)Zone 1C
Surface Preparation and Solvent Base Primer for MCPE 2 Wall (as Highlighted) ZONE 2J Axis 02AC to 02A
Inspection of Alignment for Installed Baseplate in Crescent 2 at Zone (2Q inner) as per attached draw
Two layers of 4mm thick modified bituminous waterproofing membrane for MCPE 2 Wall (as Highlighte
Concreting for BUTTRESS BII 87, 88, 89, 90 (with beam) Zone 2G 2H
Shuttering and Shear Connectors for BUTTRESS BOV & BIV 59 (2nd) Zone 2A
Concreting for BUTTRESS BOV & BIV 59 (2nd) Zone 2A
Installation of Rock and Boulder No. RB-136 - 4th Layer (4 of 4)
Installation of Rock and Boulder No. RB-135 - 2nd Layer (2 of 4)
Installation of Rock and Boulder No. RB-137 - 4th Layer (4 of 4)
Installation of Rock and Boulder No. RB-136 - 3rd layer (3 of 4)
Inspection for Installation Of Isolation Potable Water Line Pit B/F/08 as highlighted
"Inspection And Compaction Test For Backfilling 1ST Layer (01 of 04) Around Gullies G-F-31, G-F-34, G-
"Inspection of Backfilling Gravel (1st layer out of 2) for Gullies G-F-29, G-F-30, G-F-35, G-F-36, G-F-39 (
"Inspection of Sand Bedding under pipe for Fire Water Line branch at Zone-F as highlighted (SP # 67)"
"Inspection of Sand Bedding under pipe for Potable Water Line branch at Zone-F as highlighted (SP # 67
Surface Preparation prior to start Waterproofing for SBC-01 Transition Area - as highlighted
Surface Preparation Prior to Start Backfill Gravel for Manhole MH-D-07 & MH-D-08 as Highlighted
Inspection of Sand Bedding under pipe for Potable Water Line (Branch) at Zone- K - as highlighted (SP #
"Inspection of Backfilling Gravel 2nd Layer (2 of 3) For Manholes And Gullies MH-G-02, MH-G-03, M
Inspection and Compaction Test For Backfilling Subgrade 1st Layer (1 of 5) for Storm Water Line Fro
Inspection and Compaction Test For Backfilling Subgrade 3rd Layer (3 of 4) for Storm Water Line Fro
Inspection and Compaction Test For Backfilling Subgrade 3rd Layer (3 of 4) for Storm Water Line Fro
Inspection and Compaction Test For Backfilling Subgrade 3rd Layer (3 of 4) for Storm Water Line Fro
Inspection and Compaction Test For Backfilling Subgrade 3rd Layer (3 of 4) for Storm Water Line Fro
Inspection for Sand bedding under pipe for MV Line from F/MV/04 TO G/MV/25 at Zone-F & G - as highl
Inspection of Concrete (Plain) Pouirng for the Duct Bank of Fire & Security Distribution Line between G
Inspection of Concrete (Plain) Pouirng for the Duct Bank of Fire & Security Distribution Line between G
Inspection of Concrete (Plain) Pouring for the Duct Bank of Telecommunications Line between G/TL/44
Inspection and Compaction Test for NGL of Telecommunication Line from (K/TL/01 to K/TL/21) at Zone-K
Inspection and Compaction test for NGL of Fire & Security Distribution Line from (K/FS/01 to K/FS/13) a
"Inspection for Casting the Blinding Concrete under the Manhole for FW-A-10, FW-A-11, FW-A-12 (as Hi
Inspection for Blinding Concrete under Fire Water Line Pit F/F/04, F/F/05, F/F/06, F/F/07, F/F/09, G/F/0
Inspection for Laying of GreenTiles above the pipe for Fire & Security Distribution Line from K/FS/04 to
Inspection for Laying of Green Tiles above the pipe for Telecommunication Line from K/TL/10 to K/TL/42
Inspection of Sand Covering Layer for Protection of MV Line from (K/MV/01 to L/MV/08) at Zone-K&L as
Inspection of Sand Covering Layer for Protection of MV Line from (C/MV/02 to C/MV/26 & B/MV/18 to
"Inspection of Sand Bedding under pipe for Potable Water Line branch at Zone-F as highlighted (SP # 67
Inspection of alignment for installated baseplate in crescent 2 Zone 2P inner (as per attached)
Protection layer of 4mm thick bituminous protection board for Strip footing between PC (14-16), (18-20
Stack Boulders Installed layers at Levels +875.87 & +876.27, at Bottom Right Side of Geyser Garden,
Surface Preparation Prior to start Backfilling at Strip footing & PC between PC (14-16) & (18-20) Zone 1C
Stack Boulders Installed layer upto Level +877.10, at 4th Line, at Bottom Left Side of Geyser Garden,
Stack Boulders Installed Layers at levels +876.45, 876.65, +877.50 & +878.00), At Bottom Left Side of
Surface Preparation prior to Waterproofing for Floor area Inside Toilet & Entrance (GF-5071 & 5070),
Inspection of Plastering for Walls Inside Toilet & Entrance (GF-5071 & 5070), at Grid between (3-4/R
Concrete Pouring for Blinding of Internal foundations, Inside Butterfly Garden, at highlighted area in
Installation and Fixation of Anchor Bolts and Check Coordinates & Levels for Footings (6 no's) of Can
Coordinates & Levels of Footings (6 no's) of Canopy Inside Physic Garden, at highlighted area in atta
Installation of Rock and Boulder No. RB-136 - 2nd layer (2 of 4)
Installation of Rock and Boulder No. RB-137 - 3rd layer (3 of 4)
Installation of Rock and Boulder No. RB-137 - 2nd layer (2 of 4)
Installation of Rock and Boulder No. RB-134 - 1st layer (1 of 4)
Installation of Rock and Boulder No. RB-135 - 1st layer (1 of 4)
Installation of Rock and Boulder No. RB-136 - 1st layer (1 of 4)
Installation of Rock and Boulder No. RB-137 - 1st layer (1 of 4)
Inspection and Compaction Test for backfilling 1st Layer (1 of 3) to cover the Red Tiles for MV Line f
Inspection and Compaction Test for backfilling 1st Layer (1 of 1) to cover the Red Tiles for MV Line
Inspection and Compaction Test For Backfilling Subgrade 1st Layer (1 of 3) for Storm Water Line Fro
"Inspection of Backfilling Gravel 1st Layer (1 of 3) For Manholes And Gullies MH-G-01-1, MH-G-02,
"Inspection of Backfilling Gravel 2nd Layer (2 of 2) For Manholes And Gullies MH-G-01-5, MH-G-01-
"Excavation for Storm Water Line from MH-M-11 to MH-M-09 including Manhole MH-M-10, MH-M-09 -
"Excavation for Foul Water Line from FW-A-13 to FW-A-9 including Manhole FW-A-12, FW-A-11, FW-A-10
Inspection for Casting the Concrete encasement and Surface Preperation prior to start waterproofing a
Inspection for Installation Of Isolation Potable Water Line Pit B/F/06, B/F/07, B/F/09, B/F/12 - as highlight
Inspection of Concrete (Plain) Pouirng for the Duct Bank of Fire & Security Distribution Line from F/FS/
Inspection of Concrete (Plain) Pouring for the Duct Bank of Telecommunications Line from F/TL/12 to F/
Inspection and Compaction Test For Backfilling Subgrade 3rd Layer (3 of 4) for Storm Water Line Fro
Inspection and Compaction Test For Backfilling Subgrade 3rd Layer (3 of 4) for Storm Water Line Fro
Inspection and Compaction Test For Backfilling Subgrade 3rd Layer (3 of 3) for Storm Water Line Fro
Inspection and Compaction Test For Backfilling Subgrade 3rd Layer (3 of 4) for Storm Water Line Fro
Notification to start Rough Grading upto (-75cm) from top of Asphalt in Road area and (-20cm) from FG
Inspection and Compaction Test for Backfilling Sub-base under Boulder No. RB-270 (Stock Pile # 110 A-1
Inspection of Casting Blinding Concrete under Canopy Foundation of Seating Area (1) Zone-K (SA-14) - A
Inspection and Compaction Test for 1st Layer (1 of 1) Backfilling under Boulder No. RB-270 (Stock Pile #
Inspection and Compaction Test for backfilling 2nd Layer (2 of 2) to cover the Green Tiles for Teleco
Inspection and Compaction Test for 2ndLayer (2 of 2) Backfilling under Boulder No. RB-135 (Stock Pile #
Inspection and Compaction Test for 2nd Layer (2 of 2) Backfilling under Boulder No. RB-136 (Stock Pile #
Inspection and Compaction Test for 2nd Layer (2 of 2) Backfilling under Boulder No. RB-137 (Stock Pile #
Installation of straight UPVC Conduit (2x110mm) for Fire and Security Duct Bank (DB no.KK/D-FS/20 M
Installation of stub-up UPVC Conduit (Dia.32mm) for Voice and Data (WIFI) at the Physic Garden as per
Installation of stub-up UPVC Conduit (Dia.32mm) for Fire Alarm (Fire Alarm) at the Physic Garden as pe
Installation of straight UPVC Conduit (Dia.160mmx4) Medium Voltage Ductbank no. BB/D-MV/13 (from
Installation of straight UPVC Conduit (Dia.160mmx4) Medium Voltage Ductbank no. GG/D-MV/05 (f
2nd Coat Cementitious water proofing on Blinding Under the Foundation of Plant Room at Physic Gard
1st Coat Cementitious water proofing on Blinding Under the Foundation of Plant Room at Physic Garde
Solvent Base Primer Coating Prior to Membrane Water proofing on Blinding (Both End Sides 500mm) U
Surface preparation Prior to Water proofing on Blinding Under the Foundation of Plant Room at Physi
Solvent Base Primer Coating Prior to Membrane Water proofing on Blinding under foundation at Grid (
Surface preparation Prior to Water proofing on Blinding under foundation at Grid (A/8) @ Butterfly G
Screed Protection 50mm thick on Blinding under foundation at Grid (A/6-16) @ Butterfly Garden, at h
Geo-Textile on Blinding under foundation at Grid (A/6-16) @ Butterfly Garden, at highlighted area in
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 5 layers) along the Walls (O
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 7 layers) along the Walls (
Coordinates & Levels for Blinding of Internal foundations, Inside Butterfly Garden, at highlighted are
Excavation & Surface Preparation for Internal foundations, Inside Butterfly Garden, at highlighted ar
Surface Preparation & Zinc Rich Application and Concrete repair using (renderoc LA extra) to the
Stack Boulders Installed layers at Levels +875.40, +875.80 & +878.00, at Left Side Water Play Garden
Stack Boulders Installed layers upto Levels +877.10 & +877.60, at Left Side of Planted Bed 3, Inside
Stack Boulders Installed layer upto Level +877.10, at Bottom Left Side of Geyser Garden, As Highlight
Stack Boulders Installed layers at Levels +876.27, +876.67, +877.07 & +877.47, at Bottom Right Side
Installation of earthing clamps with conductor 70mm (2pcs.) for earthing reinforcement steel re-bar at
Installation of straight UPVC Conduit (Dia.160mmx4) Medium Voltage Ductbank no. GK/D-MV/01(from
Installation of straight UPVC Conduit (Dia.32mm) for Power(Socket Outlet) at Crescent-01 (Buttress Ax
Installation of straight UPVC Conduit (Dia.32mm) for Power(Socket Outlet) at Crescent-01 (Buttress Axi
Installation of straight UPVC Conduit (Dia.32mm) for Power(Socket Outlet) at Crescent-01 (Buttress Axi
Installation of straight UPVC Conduit (Dia.32mm) for Power(Socket Outlet) at Crescent-01 (Buttress Axi
Installation of straight UPVC Conduit (Dia.75mm) LV Ductbank (Normal Lighting Ckt.) from Manhole
Surface Preparation and Solvent Base Primer under Strip footing between PC 22, 24, 26 Zone 1D (as Hig
Single layer of 4mm thick modified bituminous waterproofing under Strip footing between PC 22, 24, 26
Concreting for BUTTRESS BOI 03 Zone 1A
Shuttering and Shear Connectors for BUTTRESS BII 60 (1st with Beam) Zone 2A
Concreting for BUTTRESS BII 60 (1st with Beam) Zone 2A
Installation and Survey Report for Location and Levels of Anchor Bolts for RING BEAM (Outer) Axis 02-2,
Level and Location for Infill Wall Between BI 127-128 (Inner) as highlighted Zone 2R
Level and Location for MCPE 2 WALL (OUTER ) at axis 02X to 02Y Zone 2G (as highlighted)
Level and Location for BUTTRESS BOI & BII 82, 83 (with beam) Zone 2F
Level and Location for RING BEAM Zone 2C (OUTER) Axis 02-2, 02G to 02J (as highlighted)
Surface Preparation and Solvent Base Primer for MCPE 2 Wall (as Highlighted) ZONE 2H Axis 03J to 02AB
Two Layers of 4mm thick modified bituminous water proofing membrane for MCPE 2 Wall (as Highlight
Steel Reinforcements and Shear Connector above Infill wall for RING BEAM Zone 2C (OUTER) Axis 02-2, 0
Shuttering for RING BEAM Zone 2C (OUTER) Axis 02-2, 02G to 02J (as highlighted)
Concreting for RING BEAM Zone 2C (OUTER) Axis 02-2, 02G to 02J (as highlighted)
Shuttering and Shear Connectors for BUTTRESS BOI & BII 82, 83 (with beam) Zone 2F
Concreting for BUTTRESS BOI & BII 82, 83 (with beam) Zone 2F
Two layers of 4mm thgick modified bituminous waterproofing membrane under Foundation of MCPE 4
Shuttering for MCPE 2 WALL (OUTER ) at axis 02X to 02Y Zone 2G (as highlighted)
Concreting for MCPE 2 WALL (OUTER ) at axis 02X to 02Y Zone 2G (as highlighted)
Shuttering & Shear Connector for Infill Wall Between BI 127-128 (Inner) as highlighted Zone 2R
Concreting for Infill Wall Between BI 127-128 (Inner) as highlighted Zone 2R
Warning Tape Installation for Fire Fighting Networks for (250mmØ-UPVC-Class-5). As per highlighted
Warning Tape Installation for Fire Fighting Networks for (160mmØ-UPVC-Class-5). As per highlighted
Fire Fighting Networks Sand Cover & Pipes Protection (30 cm above Pipes). As per highlighted Area i
Warning Tape Installation for Fire Fighting Networks for (250mmØ-UPVC-Class-5). As per highlighted
Fire Fighting Networks Sand Cover & Pipes Protection (30 cm above Pipes). As per highlighted Area i
Fire Fighting Networks Sand Cover & Pipes Protection (30 cm above Pipes). As per highlighted Area i
Steel Reinforcement for Footings (6 no's) of Canopy Inside Physic Garden, at highlighted area in atta
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 4 layers) along the Boundar
Pipe Installation of Fire Fighting Networks for (160, 200 & 250mmØ-UPVC-Class-5). As per highlighte
Single Layer 4mm thk Bitumenous Water proofing Membrane on Blinding under foundation at Grid (A/6
2nd Coat Bitumenous Damp proofing for Footing & Kickers of Remaining Boundary wall (All Side) at Di
1st Coat Bitumenous Damp proofing for Footing & Kickers of Remaining Boundary wall (All Side) at Di
Primer Coating Prior to Bitumenous Damp proofing for Footing & Kickers of Remaining Boundary wall (
Inspection and Compaction Test For Backfilling Subgrade 2nd Layer (2 of 4) for Storm Water Line Fro
Inspection and Compaction Test For Backfilling Subgrade 2nd Layer (2 of 4) for Storm Water Line Fro
Inspection and Compaction Test For Backfilling Subgrade 2nd Layer (2 of 4) for Storm Water Line Fro
Inspection and Compaction Test For Backfilling Subgrade 2nd Layer (2 of 4) for Storm Water Line Fro
Excavation for Telecommunication Line between K/TL/01 to K/TL/21) including pit K/TL/01, K/TL/03, K/T
Inspection & Compaction tests of 2nd (Final) Layer Backfilling (Sub-Base) (Out of 2 layers), (from leve
Excavation for Fire & Security Distribution Line from (K/FS/01 to K/FS/13) including Pit K/FS/01, K/FS/
Inspection and Compaction Test for backfilling 1st Layer (1 of 2) to cover the GreenTiles above the p
Inspection and Compaction Test for backfilling 1st Layer (1 of 2) to cover the GreenTiles above the pip
Concrete Pouring for Blinding Under the Foundation of Plant Room at Physic Garden, at highlighted a
Inspection and Compaction Test for backfilling 2nd Layer (2 of 2) to cover the GreenTiles above the pi
Inspection and compaction test 5th layer for backfilling for Zone 1P (as highlighted) Zone 1P SP#124 (5 of
Inspection and compaction test 7th layer (subgrade) for backfilling at MCPE 3 Zone 2E 2F (as highlighted
Level and Location for MCPE 2 WALL (OUTER ) at axis 03G to 02Y Zone 2G (as highlighted)
Level and Location for BUTTRESS BOI 03 Zone 1A
Level and Location for BUTTRESS BII 84, 85, 86 (with beam) Zone 2F 2G
Concreting for BUTTRESS BIV 84 Zone 2F
Concreting for BUTTRESS BIV 61 (1st) Zone 2A
Concreting of MCPE 2 foundation at Axis 03J to 02AB (as highlighted) Zone 2G 2H
Steel Reinforcements for BUTTRESS BOI BOV 31, 32, 33, 34, 35 Zone 1H, 1J
Coordinates & levels of Blinding Under the Foundation of Plant Room at Physic Garden, at highlighte
Inspection & Compaction Tests for 3rd (Final) Layer Backfilling (Sub-Grade) (Out of 3 Layers) Inside Ba
Inspection & Compaction tests of Backfilling (1 layer out of 1) Under the Foundation of Plant Room at
Excavation & Soil preparation prior to Backfilling Under the Foundation of Plant Room at Physic Garde
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 7 layers) along the Walls (O
Soil preparation Prior to Backfilling along Walls (Outer Sides) at 2 Straight Walls, Circular Wall 1 (Ou
Protection Layer 4mm thk Bituminous Protection Board on Waterproofing of footing & Kicker of Walls (Out
Concrete Pouring for Blinding under foundation at Grid (A/8) @ Butterfly Garden, at highlighted area
Solvent Base Primer Coating Prior to Membrane Water proofing on Blinding under foundation at Grid
Surface preparation Prior to Water proofing on Blinding under foundation at Grid (A/6-16) @ Butterfl
Inspection & Compaction Tests of Final Layer Sub Base Backfilling (after Sub grade) Between Circular
Inspection & Compaction tests of 7th (final) Layer Backfilling (Sub-Grade) (Out of 7 layers) along t
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Base) (Out of 2 layers), (from level +877.0
Inspection of Grouting (Vertical & Horizontal ) for Rock Boulder - RB-167 (Wadi Area) for All Layers, as
Inspection for Installation of Stone Cladding and grouting, without Copping for Wing Wall of Existing Cu
Inspection and Compaction Test For Backfilling Subgrade 2nd Layer (2 of 4) for Storm Water Line Fro
Inspection and Compaction Test For Backfilling Subgrade 2nd Layer (2 of 4) for Storm Water Line Fro
Inspection and Compaction Test For Backfilling Subgrade 2nd Layer (2 of 3) for Storm Water Line Fro
Inspection and Compaction Test For Backfilling Subgrade 2nd Layer (2 of 4) for Storm Water Line Fro
Excavation for Potable Water Line (Branch) at Zone- K including Pit - K/PW/07 - as highlighted
Soil Preparation under Boulder No. RB- 270
"Inspection and Compaction Test for Backfilling Sub-base under Boulder No. RB-135 (Stock Pile # 110 A-
"Inspection and Compaction Test for backfilling Sub-base under Boulder No. RB-136 (Stock Pile # 110 A-
Single layer of 4mm thick modified bituminous water proofing membrane for Pilecaps 19, 21, 23, 25 (a
Level and Location for RING BEAM Zone 2M (inner) Axis 02-1, 02AL to 02AP
Level and Location for TUNNEL 2 WALL (2ND) at axis 01-2 Zone 2F (as highlighted)
Installation and Survey Report for Location and Levels of Anchor Bolts for RING BEAM (INNER) Axis 02
Inspection and compaction test 11th layer for backfilling Beside Strip Footing and PC 22-24-26 Zone 1D
Inspection and compaction test 6th layer (subgrade) for backfilling at MCPE 3 Zone 2E 2F (as highlighted
Steel Reinforcements for RING BEAM Zone 2M (inner) Axis 02-1, 02AL to 02AP
Shuttering for RING BEAM Zone 2M (inner) Axis 02-1, 02AL to 02AP
Concreting for RING BEAM Zone 2M (inner) Axis 02-1, 02AL to 02AP
Shuttering and Shear Connectors for BUTTRESS BII 84, 85, 86 (with beam) Zone 2F 2G
Concreting for BUTTRESS BII 84, 85, 86 (with beam) Zone 2F 2G
Shuttering for TUNNEL 2 WALL at axis 01-2 Zone 2F (as highlighted) (2nd)
Concreting for TUNNEL 2 WALL at axis 01-2 Zone 2F (as highlighted) (2nd)
Steel Reinforcements for BUTTRESS BII BIV 29, 30 Zone 1G, 1H
Single layer of 4mm thick modified bituminous water proofing membrane for Strip footing between PC (1
Surface Preparation and Solvent Base Primer under Foundation of MCPE 4 (as Highlighted) Zone 1N
Solvent Base Primer Coating prior to Membrane waterproofing for foundation & Kickers of Boundary w
Surface Preparation prior to Backfilling along the Boundary Walls Outer Side at Elevation 'A, Whisper
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 4 layers) along the Boundar
Stack Boulders Installed one layer at Level +876.27, at Bottom Right Side of Geyser Garden, As Highli
Stack Boulders Installed 2nd Layer at level +876.68, Left side of Boat Garden along Culvert, Inside Bo
Stack Boulders Installed 6th layer (At level +877.50) at Bottom Right Side of Mist Garden, At Highligh
Stack Boulders Installed 10th layer at Level +879.50, (Part 4) along Planted Bed 2 to 3 and above, In
Stack Boulders Installed 4th layer upto Level +876.60, at Bottom Left Side of Geyser Garden, As Highl
Stack Boulders Installed 2 layers at Levels +877.10 & +877.60, at Left Side Water Play Garden (Part 2)
Stack Boulders Installed 2 layers at Levels, +878.50 & +879.00 (Part 3), at Bottom side of Planted Bed
Stack Boulders Installed 2 layers at Levels +876.67 & +877.07, at Bottom Right Side of Geyser Garden
Surface Preparation prior to Waterproofing for Floor area Inside Shower (GF-5087), Toilet (GF-5088)
Inspection of Plastering for walls Inside Toilet (GF-5088) & Shower (GF-5087) & Entrance, at Grid (1
Inspection of Spatter Dash (Rough Coat) Prior to Plastering for Curve wall (All sides), at Grid betwee
Installation of straight UPVC Conduit (Dia.32mm) for Power(Socket Outlet) at Crescent-01 (Buttress Axi
Installation of straight UPVC Conduit (Dia.32mm) for Power(Socket Outlet) at Crescent-01 (Buttress Axi
Installation of straight UPVC Conduit (Dia.32mm) for Power(Socket Outlet) at Crescent-01 (Buttress Axi
Steel Reinforcement for Ring Beam (outer) Zone 2D (as highlighted)
SHuttering for Ring Beam (outer) Zone 2D (as highlighted)
"Inspection of Thrust Block for UPVC Pipe (200mm) for Potable Water Line at Zone-F & K - As Highlight
Level and Location for Excavation for Retaining Walls from Axis 01M to 01K
Inspection and Compaction Test For Backfilling Subgrade 1st Layer (1 of 4) for Storm Water Line Fro
Inspection and Compaction Test For Backfilling Subgrade 1st Layer (1 of 4) for Storm Water Line Fro
Level and Location for Ring Beam (outer) Zone 2D (as highlighted)
Inspection and Compaction Test For Backfilling Subgrade 1st Layer (1 of 4) for Storm Water Line Fro
Inspection and Compaction Test For Backfilling Subgrade 1st Layer (1 of 4) for Storm Water Line Fro
Inspection of Sand Covering Layer for Protection of Telecommunications Line from (K/TL/13 to K/TL/20)
Inspection of Sand Covering Layer for Protection of Fire & Security Distribution Line from (K/FS/21 to L
Inspection for Installation Of Isolation Potable Water Line Pit K/PW/01, K/PW/03, K/PW/07, K/PW/08 - a
Concreting of Ring Beam (outer) Zone 2D (as highlighted)
"Surface Preparation Prior to Start Backfilling Gravel For GULLIES G-F-29, G-F-30, G-F-31, G-F-34, G-F-3
"Inspection for casting concrete for short piece and Surface Preperation prior to start waterproof
Installation and Survey Report for Location and Levels of Anchor Bolts for ring beam (outer) Zone 2D (as
"INSPECTION OF INSTALLATION OF SLAB FOR MH-G-01, MH-G-01-6, MH-G-02, MH-G-03, MH-G-03-1, M
"INSPECTION FOR INSTALLATION OF ALL RINGS (RISER) AND SLAB FOR MH-D-07 (As Highlighted)"
"INSPECTION FOR INSTALLATION OF GULLIES G-F-29, G-F-30, G-F-31, G-F-34, G-F-35, G-F-36, G-F-38, G-F-
Level and Location for Mass Concrete of Strip Footing Between PC 17 - 19 Zone 1C
Inspection and compaction test 10th layer for backfilling Beside Strip Footing and PC 22-24-26 Zone 1D
Shuttering and Shear Connector for BUTTRESS BOI 03 Zone 1A
Concreting for BUTTRESS BII 61 (2nd) Zone 2A
Shuttering and Shear Connectors for BUTTRESS BII 61 (2nd) Zone 2A
Concrerting for Blinding of MCPE 4 Foundation Zone 1N (as highlighted)
Concreting for MCPE 2 WALL (OUTER ) at axis 03I to 02Z Zone 2H (as highlighted)
Concreting for MCPE 3 WALL (OUTER ) at axis 02S to 02R Zone 2E 2F (as highlighted)
Concreting for Blinding of Retaining Wall of Zone 4 axis 01M to 01K
Anti Termite application under Mass Concrete of Strip Footing Between PC 17 - 19 Zone 1C
Shuttering for Mass Concrete of Strip Footing Between PC 17 - 19 Zone 1C
Concreting for Mass Concrete of Strip Footing Between PC 17 - 19 Zone 1C
Protection layer of 4mm thick bituminous protection board of Strip Footing Between PC 127-129 Zone 2
Coordinates & Levels of Blinding under foundation at Grid (A/6-16) @ Butterfly Garden, at highlighte
Excavation & Blinding levels under foundation at Grid (A/7-9) @ Butterfly Garden, at highlighted area
Block work from Lintel Upto Final Height, at Whispering Cave 1 & 2, inside Sound & Light Garden, At
Stone Coping on Boundary Walls Between Outer Canopy 1 & 2 and from Plant Room untill Outer Canopy
Stone Cladding for Walls (Inner Face) at Outer Canopy 3 and for Walls (Outer Face) from Inside the P
Inspection of Stone Coping on Boundary wall @ Elevation "B to C & C to D" @ Maze Garden, As highli
Inspection of Stone Coping on Boundary wall @ Elevation "A to B & D to A" (Including Entrance Walls
Inspection of Stone Coping on Boundary wall at "Elevation "D to A", "A to B (Untill Existing wall)" &
Inspection of Stone Coping on Boundary wall at "Elevation B, C & E" @ Discovery Garden, At highlight
Inspection of Stone Coping on Boundary wall at "Elevation A, D & F" @ Discovery Garden, At highligh
Inspection & Compaction Tests for 2nd Layer Backfilling (Sub-Grade) (Out of 3 Layers) Inside Back of H
Inspection & Compaction Tests of 4th Layer Sub Garde Backfilling (Out of 5 Layers) along the Boundar
Grouting for Stone Cladding of Boundary wall (Inner & Outer Sides) at Span 71, 72 & 73 and Column's
Completion of Stack Boulders with Grouting at Left side of Planted Bed 1, (Part 2), Inside Water Play
"Inspection of Grouting (Horizontal Joints) for Rock Boulder - RB-273 for All Layers"
"Inspection of Grouting (Vertical Joints) for Rock Boulder - RB-273 for All Layers"
"Inspection of Grouting (Horizontal Joints) for Rock Boulder - RB-271 for All Layers"
"Inspection of Grouting (Vertical Joints) for Rock Boulder - RB-271 for All Layers"
Inspection and Compaction Test for backfilling 1st Layer (1 of 1) for MV line from G/MV/06 to G/MV/17 a
Inspection of backfilling Gravel for the Duct Bank of MV Line from G/MV/06 to G/MV/17 at Zone- G (As
Surface Preparation Prior to Start Backfilling Gravel For Manholes MH-G-01, MH-G-02, MH-G-03, M
Inspection of Backfilling Gravel 1st Layer (1 of 2) For Manholes And GULLIES MH-G-01-5, MH-G-01-4,
Inspection of Concrete Pouring for Duct Bank of Telecommunications line from G/TL/29 to near H/TL/06
Inspection of Concrete Pouring for Duct Bank of Fire & Security line from G/FS/33 to near H/FS/06 at Zo
Inspection of Formwork for Duct Bank of Telecommunications line from G/TL/29 to near H/TL/06 at Zon
Inspection of Formwork for Duct Bank of Fire & Security line from G/FS/33 to near H/FS/06 at Zone-G -
Inspection of Steel Reinforcement for Duct Bank of Telecommunications line from G/TL/29 to near H/TL
Inspection of Steel Reinforcement for Duct Bank of Fire & Security line from G/FS/33 to near H/FS/06 at
Inspection of Sand Covering Layer for Protection of Fire & Security Distribution Line from (G/FS/52 to
Inspection of Sand Covering Layer for Protection of Telecommunications Line from (G/TL/54 to K/TL/01)
Inspection of Sand Covering Layer for Protection of Fire & Security Distribution Line from (K/FS/03 to
Inspection of Sand Covering Layer for Protection of Telecommunications Line from (K/TL/03 to near K/T
Inspection of Concrete Pouring for the Duct Bank of MV Line from G/MV/08 to G/MV/36 at Zone-G (As H
Inspection of Formwork for the Duct Bank of MV Line from G/MV/08 to G/MV/36 at Zone-G (As Highligh
Inspection of Steel Reinforcement for the Duct Bank of MV Line from G/MV/08 to G/MV/36 at Zone-G (A
"Inspection and Compaction Test for 13th Layer (13 of 13) Backfilling around SBC-06 (Stock Pile # 129 A
Level and Location for Blinding of Retaining Wall of Zone 4 axis 01M to 01K
Level and Location for BUTTRESS BOI BII 53 (2ND) Zone 1N
Level and Location for BUTTRESS BOV BIV 82, 83 Zone 2F
Level and Location for BUTTRESS BII 91, 92 (with beam) Zone 2H
Concreting of 2nd layer Mass Concrete for Stip footing between PC 22-24-26 Zone 1D
Concreting of 3rd layer Mass Concrete for Stip footing between PC 24-26 Zone 1D
Concreting of 3rd layer Mass Concrete for Stip footing between PC 140-142-144-146 Zone 2H
Shuttering for Blinding of Retaining Wall of Zone 4 axis 01M to 01K
Solvent Base Primer and Single layer of 4mm thick modified bituminous water proofing membrane of S
Shuttering and Shear Connectors for BUTTRESS BOV BIV 82, 83 Zone 2F
Concreting for BUTTRESS BOV BIV 82, 83 Zone 2F
Shuttering and Shear Connectors for BUTTRESS BOI BII 53 (2ND) Zone 1N
Concreting for BUTTRESS BOI BII 53 (2ND) Zone 1N
Two Layers of 4mm thick modified bituminous waterproofing membrane for MCPE 2 outer Wall Axis 03-2
Single layer of 4mm thick modified bituminous waterproofing membrane for Strip footing between PC 2
Protection layer of 4mm thick bituminous protection board for Strip footing between PC 22-24-26 Zone
Pipe Installation of Foul Water Line for (110mmØ - UPVC- Class 4) from (FW-A-13.5 to CENOZOIC GAR
Bedding of Gravel 3/8" and Geotextile Surrounding Foul Water Line for (110mmØ - UPVC- Class 4) f
Surface preparation and Solvent base Primer for Strip footing between PC (14-16), (18-20) ( Zone 1C (as
Shuttering and Shear Connectors for BUTTRESS BII 91, 92 (with beam) Zone 2H
Concreting for BUTTRESS BII 91, 92 (with beam) Zone 2H
Surface preparation prior to waterproofing for foundation & Kickers of Boundary wall (Inner & Outer
Inspection & Compaction tests of 7th Layer Backfilling (Sub-Grade) (Out of 8 layers) for 1 Curved Wall
Sand Cover Protection & Warning Tiles on Low voltage Lines, Telecom lines, Emergency Lines and Fire
Concrete Pouring & Shuttering for Wall & Column of Boundary wall @ span 2 at Water Garden, as hig
Concrete Pouring & Shuttering for Ring Beam & Remaining part of Wall @ Grid (10-16/Right Side) or G
Aluminium Flashing & Sealant for water proofing on Foundations of Columns (Upto 500mm height) (All
Inspection & Compaction Tests of 4th Layer Sub Garde Backfilling (Out of 5 Layers) along the Boundary
2nd Coat Damp proofing for footing & Kicker of Circular Wall 1 (Outer Side at Half part 1 & Both Sides
Stack Boulders Installed 4th layer upto Levels +876.60, at Left Side Water Play Garden (Part 2), As Hi
Stack Boulders Installed 5 layers at Levels (+877.10, +877.60, +878.00, +878.50 & +879.00) at one p
Stack Boulders Installed 1st & 2nd layer (Remaining) at Step 1, at levels +875.17 & +875.45, at Right
Stack Boulders Installed 6th layer (upto Level +878.50) at Right Side of Mist Garden (Part 2), At High
Inspection of Plastering of walls Inside Toilets (GF-5061, 5062, 5063, 5064, 5065 & 5066), at Grid (6
Inspection of Concrete Pouring for the Duct Bank of MV Line from G/MV/35 to G/MV/34 at Zone-G (As H
Inspection of Concrete Pouring for the Duct Bank of MV Line from G/MV/09 to G/MV/10 at Zone-G (As H
Excavation and Soil Preparation under Canopy Foundation at Seating Area (1) Zone-K (SA-14) - As Highli
"Inspection for application of Bituminous Damp Proofing (1st & 2nd Coat) on top of Primer for Canopy
Inspection for application of Base Primer (50%x50% Bitumin & Water) on Canopy Foundation at Seating
Installation of straight UPVC Conduit (Dia.25mm) and Security (CAM ) at the Sound and Light Garden as
"Inspection of Concrete Pouring for Canopy Foundation of Seating Area (1) Zone-G (SA-10, SA-11, SA-12,
"Inspection of Formwork for Canopy Foundation of Seating Area (1) Zone-G (SA-10, SA-11, SA-12, SA-13
Installation of straight UPVC Conduit (Dia.25mm) and Box for Voice and Data (WIFI & CAM ) at the Sou
Inspection of Steel Reinforcement for Canopy Foundation and Column Neck of Seating Area (1) Zone-G (
Surface Preparation prior to start backfilling Gravel for the Duct Bank of MV Line from G/MV/06 to G/M
Inspection and Compaction Test For Backfilling Subgrade 1st Layer (1 of 4) for Storm Water Line Fro
Inspection and Compaction Test For Backfilling Subgrade 1st Layer (1 of 3) for Storm Water Line Fro
Inspection and Compaction Test For Backfilling Subgrade 1st Layer (1 of 4) for Storm Water Line Fro
Inspection and Compaction Test for backfilling 1st Layer (1 of 2) to cover the GreenTiles above the pip
Level and Location for Buttress BII 87, 88, 89, 90 (with Beam) Zone 2G 2H.
Concreting for Buttress BII 87, 88, 89, 90 (with Beam) Zone 2G 2H.
Shuttering and Shear Connectors for Buttress BII 87, 88, 89, 90 (with Beam) Zone 2G 2H.
Concreting for Buttress BIV 87, 88, 89, 90 Zone 2H 2G.
Concreting for Buttress BIV 95 Zone 2J.
Concreting for Buttress (with Beam) BII 20, 21 Zone 1E 1F.
Concreting for Buttress BOI BII 52 (2nd) Zone 1N.
Concreting for Buttress BOI 20, 21 Zone 1E 1F.
Concreting for Buttress BIV BOV 53 (2nd) zone 1N.
Shuttering and Shear Connector for Buttress BIV BOV 59 (1sst) zone 2A.
Concreting for Buttress BIV BOV 59 (1st) zone 2A.
Surface Preparation and Solvent Base Primer for Pilecaps 53, 54, 55, 56, 57, 58 (as Highlighted) ZONE 1H
Single layer of 4mm thick modified bituminous waterproofing membrane for Pilecaps 53, 54, 55, 56, 57,
Protection layer of 4mm thick bituminous protection board for Pilecaps 53, 54, 55, 56, 57, 58 (as Highl
Surface Preparation and Solvent Base Primer for Pilecaps 59, 60, 61, 62, 63, 64 (as Highlighted) ZONE 1J
Single layer of 4mm thick modified bituminous water proofing membrane for Pilecaps 59, 60, 61, 62, 63
Protection layer of 4mm thick bituminous protection board for Pilecaps 59, 60, 61, 62, 63, 64 (as Highl
Surface Preparation and Solvent Base Primer for Pilecaps 65, 66, 67, 68, 69, 70 (as Highlighted) ZONE 1K
Single layer of 4mm thick modified bituminous waterproofing membrane for Pilecaps 65, 66, 67, 68, 69,
Protection layer of 4mm thick bituminous protection board for Pilecaps 65, 66, 67, 68, 69, 70 (as Highl
Inspection and Compaction Test for backfilling 1st Layer (1 of 2) to cover the Green Tiles for Telecom
Inspection of Water Proofing for the Duct Bank of MV Line from B/MV/26 to B/MV/18, B/MV/12 to
Surface Preparation prior to start water proofing for the Duct Bank of MV Line from B/MV/26 to
Installation of straight UPVC Conduit (Dia.32mm) for Power(Socket Outlet) at Crescent-01 (Buttress Axi
Installation of straight UPVC Conduit (Dia.32mm) for Power(Socket Outlet) at Crescent-01 (Buttress Axi
Installation of straight UPVC Conduit (Dia.32mm) for Power(Socket Outlet) at Crescent-01 (Buttress Axi
Installation of straight UPVC Conduit (2x110mm) for Fire and Security Duct Bank (DB no.FF/D-FS/04
2nd Coat Damp proofing for footing & Kicker of Walls (Outer Sides) at 3 Straight Walls, inside Maze g
Installation of straight UPVC Conduit (4x110mm) for TELECOM Duct Bank (DB no.FF/D-TL/03 Manhole n
Installation of straight UPVC Conduit (Dia.25mm) and Box for Voice and Data (WIFI ) at Buttress Axis (
Installation of straight UPVC Conduit (Dia.25mm) and Box for Fire Alarm (Speaker) at Buttress Axis (01
Installation of straight UPVC Conduit (Dia.25mm) and Box for Voice and Data (WIFI ) at Buttress Axis (
Installation of straight UPVC Conduit (Dia.25mm) and Box for Fire Alarm (Speaker 2pcs. ) at Buttress A
Installation of straight UPVC Conduit (Dia.25mm) and Box for Security (CAM ) at Buttress Axis (01/1T)
Installation of straight UPVC Conduit (Dia.25mm) and Box for Voice and Data (WIFI & CAM ) at Buttress
1st Coat Damp proofing for footing & Kicker of Circular Wall (Outer Side at Half part 1 & Both Sides at
Installation of straight UPVC Conduit (Dia.25mm) and Box for Fire Alarm (Speaker ) at Buttress Axis (0
Primer Coating Prior to Damp proofing for footing & Kicker of Circular Wall (Outer Side at Half part 1
Surface Preparation prior to Backfilling along the Boundary Walls Outer Side at Elevation 'G, Whisperin
Soil preparation prior to Backfilling along the Wall (Outer side) (at Bottom of Blinding level +874.19)
Stack Boulders Installed 3rd layers (At level +877.50), At Bottom Left Side of Mist Garden, At Highlig
Stone Coping on Boundary wall (after Stone Cladding for walls) @ Span 1 of Water Garden, at Highlig
Level and Location for BUTTRESS (with Beam) BII 03 Zone 1A
Inspection and compaction test 4th layer for backfilling for Zone 1P (as highlighted) Zone 1P SP#124 (4 of
Inspection and compaction test 5th layer (subgrade) for backfilling at MCPE 3 Zone 2E 2F (as highlighted
Inspection of alignment for installated baseplate in crescent 2 Zone 2K outer (as per attached)
Protection layer of 4mm thick bituminous protection board for Pilecaps 19, 21, 23, 25 (as Highlighted)
Surface Preparation and Solvent Base Primer for Pilecaps 19, 21, 23, 25 (as Highlighted) ZONE 1D
Surface Preparation Prior to start Backfilling at NORTH SMALL MOSQUE (as Highlighted) Zone 1N
Level and Location for MCPE 2 WALL (OUTER ) at axis 03G to 02Y Zone 2G (as highlighted)
Level and Location for BUTTRESS BIV 84 Zone 2F
Inspection and Compaction Test For Backfilling Subgrade 1st Layer (1 of 2) for Storm Water Line From
Installation of Rock and Boulder No. RB-271 - 4th layer (4 of 4)
Installation of Rock and Boulder No. RB-140 (Wadi Area) - Additional Flower Beds, Steps and 1 to 8 La
Installation of Rock and Boulder No. RB-271 - 3rd layer (3 of 4)
Installation of Rock and Boulder No. RB-271 - 2nd layer (2 of 4)
Inspection of Grouting (Vertical & Horizontal) for Rock Boulder - RB-140 (Wadi Area) for All Layers as
Inspection of Backfilling Gravel 1st Layer (1 out of 5) around the Manhole for MH-A-02, MH-A-10 as Hi
Inspection for Blinding Concrete under Fire Water Line Pit B/F/06, B/F/07, B/F/08, B/F/09, B/F/12, B/F/1
Inspection & Compaction tests of 2nd (Final) Layer Backfilling (Sub-Base) (Out of 2 layers), (from leve
Inspection of Water proofing for the Duct Bank of MV Line from G/MV/06 to G/MV/17 at Zone-G (As Hig
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Base) (Out of 2 layers), (from level +877.0
Inspection of Sand Bedding under pipe for MV Line from G/MV/25 TO G/MV/02 at Zone-G as highlighted
"Inspection and Compaction Test for 12th Layer (12 of 14) Backfilling around SBC-06 (Stock Pile # 129 A
Inspection of Spatter Dash (Rough Coat) Prior to Plastering for Windows opennings (41 No's), at Man
Inspection for Installation Of Isolation Potable Water Line Pit K/PW/02, K/PW/09, G/PW/02, G/PW/07 - a
Inspection for Casting the Concrete encasement and Surface Preperation prior to start waterproofing a
Installation of straight UPVC Conduit (Dia.32mm) for Power(Socket Outlet) at Crescent-01 (Buttress Axi
Inspection and Compaction Test for 2ndLayer (2 of 2) Backfilling under Boulder No. RB-135 (Stock Pile #
Inspection and Compaction Test for 2nd Layer (2 of 2) Backfilling under Boulder No. RB-136 (Stock Pile #
Inspection and Compaction Test for 2nd Layer (2 of 2) Backfilling under Boulder No. RB-137 (Stock Pile #
Installation of straight UPVC Conduit (Dia.32mm) for Power(Socket Outlet) at Crescent-01 (Buttress Axi
Inspection & Compaction tests of 6th Layer Backfilling (Sub-Grade) (Out of 8 layers) for 1 Curved Wall
Installation of straight UPVC Conduit (Dia.32mm) for Power(Socket Outlet) at Crescent-01 (Buttress Axi
Excavation for MV Line from G/MV/01 TO G/MV/25 at Zone-G including Pit G/MV/01, G/MV28, G/MV/15
Inspection & Compaction tests of 8th (Final) Layer Backfilling (Sub-Grade) (Out of 8 layers) for 1 Curv
Inspection for Laying of Red Tiles above the pipe for MV Line from C/MV/02 to B/MV/26 & B/MV/18 to
Aluminium Flashing & Sealant for water proofing on Foundation of Boundary wall (Outer Face) @ Grid
Steel Reinforcements and Shear Connector (Above Infill wall) for RING BEAM (inner) Axis 02-1, 02G to 0
Inspection for Laying of GreenTiles above the pipe for Fire & Security Distribution Line from B/FS/24 t
Aluminium Flashing & Sealant for water proofing on Foundation of Boundary wall (Inner Face) at Grid (
Inspection for Laying of Green Tiles above the pipe for Telecommunication Line from B/TL/21 to B/TL/4
Installation of straight UPVC Conduit (Dia.25mm) and Box for Voice and Data (WIFI ) at Buttress Axis (
Installation and Fixation of Anchor Bolts and Check Coordinates & Levels for Ring Beam @ Grid (10-16
Installation of straight UPVC Conduit (Dia.25mm) and Box for Fire Alarm (Speaker ) at Buttress Axis (0
Protection layer of 4mm thick bituminous protection board for Pilecaps 46, 48, 50 Zone 1H 1G
Coordinates & Levels for Ring Beam & Remaining part of Wall @ Grid (10-16/Right Side) or Grid 11 to
Installation of straight UPVC Conduit (Dia.25mm) and Box for Voice and Data (WIFI ) at Buttress Axis (
Protection layer of 4mm thick bituminous protection board for Pilecaps 45, 47, 49, 51 Zone 1H 1G
Installation of straight UPVC Conduit (Dia.25mm) and Box for Fire Alarm (Speaker ) at Buttress Axis (0
Inspection of Spatter Dash (Rough Coat) Prior to Plastering of walls Inside Toilets (GF-5064, 5065 &
Plaster Guide Points & Accessories for Plastering of walls Inside Toilets (GF-5064, 5065 & 5066), at G
Installation of straight UPVC Conduit (Dia.25mm) and Box for Security (CAM ) at Buttress Axis (01/1Q)
Installation of straight UPVC Conduit (Dia.25mm) and Box for Voice and Data (WIFI&CAM ) at Buttress
Steel Reinforcements for BUTTRESS BOI BOV 22, 23, 24, 25, 26, 27, 28, 29, 30 Zone 1F 1G, 1H
Marking & Check for coordinates of Tree Pits (8 no's) at Left side of Mist Garden, at highlighted area
Installation of straight UPVC Conduit (Dia.25mm) and Box for Fire Alarm (Speaker ) at Buttress Axis (0
Shuttering for MCPE 2 WALL (OUTER ) at axis 03G to 02Y Zone 2G (as highlighted)
Concreting for MCPE 2 WALL (OUTER ) at axis 03G to 02Y Zone 2G (as highlighted)
Surface Preparation prior to start Waterproofing of Strip Footing Between PC 127-129 Zone 2F
Two Water proofing Membrane for two Foundation of Promenade Bridge Zone 2E (as highlighted)
Protection layer of 4mm thick bituminous protection board for two Foundation of Promenade Bridge Zon
Shuttering and Shear Connectors for BUTTRESS BIV 84 Zone 2F
Concreting for BUTTRESS BIV 84 Zone 2F
Installation of Rock and Boulder No. RB-273 - 4th layer (4 of 4)
Installation of Rock and Boulder No. RB-273 - 3rd layer (3 of 4)
Installation of straight UPVC Duct Bank (4x110 mm) for Low Current (Telecom Communication TC) fro
Installation of straight UPVC Duct Bank (2x110 mm) for Low Current (FS) G/RC-FS/46 to G/RC-FS/20
Plaster Guide Points & Accessories for Plastering of Curve wall (All sides), at Grid between (20/X), a
Inspection & Compaction Tests of 3rd Layer Sub Garde Backfilling (Out of 5 Layers) along the Boundar
Installation of Rock and Boulder No. RB-273 - 2nd layer (1 of 4)
Installation of Rock and Boulder No. RB-167 (Wadi Area) - Flower Beds, Steps for Completion, as per
Inspection & Compaction Tests of 3rd Layer Sub Garde Backfilling (Out of 4 Layers) along the Boundary
Inspection & Compaction tests of 5th Layer Backfilling (Sub-Grade) (Out of 8 layers) for 1 Curved Wall
Installation of Rock and Boulder No. RB-139 (Wadi Area) - Flower Beds, Steps and 1 to 9 Layer for Com
Inspection & Compaction tests of 7th Layer Backfilling (Sub-Grade) (Out of 8 layers) for 1 Curved Wall
1st Coat Damp proofing for footing & Kicker of Walls (All Sides) at 3 Straight Walls, inside Maze garde
Inspection and Compaction Test for Backfilling Subgrade 1st Layer (1 of 1) around the Duct Bank (Abo
Primer Coating Prior to Damp proofing for footing & Kicker of Walls (All Sides) at 3 Straight Walls, in
Inspection and Compaction Test for Backfilling Subgrade 1st Layer (1 of 1) around the Duct Bank (Abo
Excavation & Soil Preparation Prior to Boulders, at 2nd to 4th line of boulders, At Bottom Left Side o
Inspection and Compaction Test for Backfilling Subgrade 1st Layer (1 of 1) around the Duct Bank (Abo
Inspection and Compaction Test for 1st Layer (1 of 2) Backfilling under Boulder No. RB-136 (Stock Pile #
Inspection and Compaction Test for 1st Layer (1 of 2) Backfilling under Boulder No. RB-137 (Stock Pile #
Inspection and Compaction Test for 1st Layer (1 of 2) Backfilling under Boulder No. RB-135 (Stock Pile #
Inspection for Backfilling Sub-base under Boulder no. RB-134 (SP # 110 A-1-A)
Soil Preparation under Boulder No. RB- 134
Soil Preparation under Boulder No. RB- 135
Soil Preparation under Boulder No. RB- 136
Soil Preparation under Boulder No. RB- 137
"Inspection of Backfilling Gravel around the Manholes for MH-F-01, MH-F-02, MH-F-03, MH-F-04 - AS Hi
Surface Preparation prior to start Water Proofing for Canopy Foundation of Seating Area (1) Zone-K & L
Inspection of Concrete Pouring for Canopy Foundation of Seating Area (1) Zone-K & L (SA-15, SA-16, SA-1
Inspection and Compaction Test For Backfilling Subgrade 1st Layer (1 of 2) for Storm Water Line From
Surface Preparation prior to start water proofing for the Duct Bank of MV Line from G/MV/06 to G/MV/
"Inspection and Compaction Test for 11th Layer (11 of 14) Backfilling around SBC-06 (Stock Pile # 129 A
Inspection of Sand Bedding under pipe for Telecommunication Line between G/TL/26 to G/TL/45 at Zone
Inspection of Sand Bedding under pipe for Fire & Security Distribution Line from G/FS/40 to G/FS/46 at
Inspection and compaction test 9th layer for backfilling Beside Strip Footing and PC 22-24-26 Zone 1D (a
Inspection and compaction test 4th layer (subgrade) for backfilling at MCPE 3 Zone 2E 2F (as highlighted
Installation and Survey Report for Location and Levels of Anchor Bolts for RING BEAM (INNER) Axis 02-1
Level and Location for RING BEAM (inner) Axis 02-1, 02G to 02J Zone 2C
Shuttering and Shear Connectors for BUTTRESS(with Beam) BII 03 Zone 1A
Concreting for BUTTRESS(with Beam) BII 03 Zone 1A
Shuttering for RING BEAM (inner) Axis 02-1, 02G to 02J Zone 2C
Concreting for RING BEAM (inner) Axis 02-1, 02G to 02J Zone 2C
Stack Boulders Installed 3rd layer upto Level +876.20, at Bottom Left Side of Geyser Garden, As Highl
Stack Boulders Installed 1st Layer at level +876.28, Left side of Boat Garden along Culvert, Inside Bo
Excavation & Soil Preparation Prior to Boulders, At Between Geyser Garden & Culvert near Boundary w
Stack Boulders Installed 8th Layer at level +878.68, Between Boat Garden and Boundary wall span (13
Stack Boulders Installed 2 layers at Levels +875.27 & +875.47, at Bottom Right Side of Geyser Garden
Stack Boulders Installed 6th layer (upto Level +878.50) at Top & Left Side of Mist Garden (Part 1), At
Excavation & Soil Preparation Prior to Boulders, At Bottom Left Side of Mist Garden, at highlighted ar
Inspection & Compaction Tests of Final Layer Sub Base Backfilling after Sub Grade (Start from Bottom o
Inspection & Compaction Tests of 2nd Layer Sub Garde Backfilling (Out of 4 Layers) along the Boundar
Stone Cladding for wall (All Sides) At Small Straight Wall and Circular wall 1 (All Side), at Maze garden
Inspection & Compaction tests of 4th Layer Backfilling (Sub-Grade) (Out of 8 layers) for 1 Curved Wall
Inspection & Compaction tests of 6th Layer Backfilling (Sub-Grade) (Out of 8 layers) for 1 Curved Wall
Inspection & Compaction tests of 4th (final) Layer Backfilling (Sub-Grade) (Out of 4 layers) Inside W
Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Grade) (Out of 4 layers) Inside Whisperin
Excavation & Bed Preparation for Conduits (75mm) Laying for Normal Lighting Circuits Lines, running U
Stack Boulders Installed 3rd & 4th layers upto Level +876.20 & +876.60, at Left Side of Planted Bed 3
Stack Boulders Installed 3rd layer upto Levels +876.20, at 1st line of boulders, at Left Side Water Pla
Stack Boulders Installed 1st & 2nd layers (At level +876.20 & +876.60), At Bottom Left Side of Mist G
Stack Boulders Installed small layer at Levels +875.67, at Bottom Right Side of Geyser Garden, As Hig
Stack Boulders Installed 1st layer (Remaining part) at Step 2, at level 875.57, at Right side of Geyse
Stack Boulders Installed 4 layers at Levels (+877.50, +878.00, +878.50 & +879.00) at one place betw
Stack Boulders Installed 2 layers upto Levels +875.40 & +875.80, at Bottom Left Side of Geyser Garde
Stack Boulders Installed 1st layer at 2 places upto Levels +875.87 & +876.27, at Bottom Right Side of
Installation of Rock and Boulder No. RB-271 - 1st layer (1 of 4)
Installation of Rock and Boulder No. RB-273 - 1st layer (1 of 4)
"Surface Preparation Prior to Start Backfilling Gravel For Manholes And GULLIES MH-G-01-5, MH-G-
INSPECTION OF INSTALLATION OF ALL RINGS (RAISER) AND SLAB FOR FW-A-08 (AS ATTACHED)
"Inspection For Manhole Base Installation And UPVC Pipe Connection For FW-A-08, as highlighted "
Inspection of Sand Bedding for MV Line from G/MV/02 TO G/MV/05 at Zone-G as highlighted in the at
Excavation for MV Line from G/MV/25 TO G/MV/02 at Zone-G including Pit G/MV/25, G/MV24, G/MV/14
"Inspection of Sand Bedding under pipe for Potable Water Line (Branch) at Zone - K - As highlighted (SP
Inspection of Sand Covering Layer for Protection of Fire & Security Distribution Line from (G/FS/07 to
Inspection of Sand Covering Layer for Protection of Telecommunications Line from (G/TL/21 to G/TL/51)
Inspection of Reinforced Concrete Pouring for Duct Bank of Fire & Security line between G/FS/17 to G/
Inspection of Formwork for Duct Bank of Fire & Security line from G/FS/17 to G/FS/10 at Zone-G - As Hi
Inspection of Steel Reinforcement for Duct Bank of Fire & Security line between G/FS/17 to G/FS/10 at
Inspection of Reinforced Concrete Pouring for Duct Bank of Telecommunications line between G/TL/32
Inspection of Formwork for Duct Bank of Telecommunications line from G/TL/32 to G/TL/30 at Zone-G -
Inspection of Steel Reinforcement for Duct Bank of Telecommunications line between G/TL/32 to G/TL/
Inspection of Concrete (Plain) Pouirng for the Duct Bank of Fire & Security Distribution Line from G/FS/
Inspection of Concrete (Plain) Pouring for the Duct Bank of Telecommunications Line from G/TL/32 to G
"Inspection and Compaction Test for 10th Layer (10 of 14) Backfilling around SBC-06 (Stock Pile # 129 A
"Inspection and Compaction Test for 13th Layer (13 of 14) Backfilling around SBC-06 (Stock Pile # 129 A-
Inspection and Compaction Test For Backfilling Subgrade 1st Layer (1 of 4) for Storm Water Line Fro
Pipe Installation of Potable Water Networks for (50 & 200mmØ-UPVC-Class-5). As per highlighted Are
Installation of straight UPVC Conduit (Dia.25mm) and Box for Fire Alarm (Speaker & Flashing Beacon) a
Shuttering and Shear Connector for BUTTRESS BOV 84, 87 Zone 2G 2F
Concreting for Mass Concrete of Strip Footing Between PC 14-16-18-20 Zone 1C
Anti Termite application under Mass Concrete of Strip Footing Between PC 14-16-18-20 Zone 1C
Concreting for Infill Wall Between BI 126-127 (Inner) as highlighted Zone 2R
Shuttering & Shear Connector for Infill Wall Between BI 126-127 (Inner) as highlighted Zone 2R
Concreting for BUTTRESS BIV BOV 52 (2nd) Zone 1N
Concreting for BUTTRESS BOV 87 Zone 2G 2F
Installation and Survey Report for Location and Levels of Anchor Bolts for CANOPY @ BII 03 Zone 1A (as
Surface Preparation Prior to start Backfilling For Zone 1P (as Highligted), Continuation for backfilling (3r
Inspection and compaction test 3rd layer for backfilling for Zone 1P (as highlighted) Zone 1P SP#124 (3 of
Inspection and compaction test 8th layer for backfilling Beside Strip Footing and PC 22-24-26 Zone 1D (a
Inspection and compaction test 3rd layer (subgrade) for backfilling at MCPE 3 Zone 2E 2F (as highlighted
Level and Location for Excavation for Strip Footing Between PC 17-19 Zone 1C
Level and Location for Strip Footing between PC 14-16 & 18-20 Zone 1C
Level and Location for BUTTRESS BII 61 (2nd) Zone 2A
Concreting for RING BEAM (outer) Axis 02-2, 02AP to 02AT Zone 2N
Steel Reinforcements for BUTTRESS BII BIV 22, 23, 24, 25, 26, 27, 28 Zone 1F 1G
Shuttering and Shear Connectors for BUTTRESS BII 61 (2nd) Zone 2A
Installation of straight UPVC ducts (Dia 6 inch) Mediam Voltage Duct bank 4X160mm between man
Concreting for BUTTRESS BII 61 (2nd) Zone 2A
Surface Preparation and Solvent base Primer for Strip footing between PC 22-24-26 Zone 1D (as Highlig
Steel Reinforcements for Strip Footing between PC 14-16 & 18-20 Zone 1C
Shuttering for Strip Footing between PC 14-16 & 18-20 Zone 1C
Concreting for Strip Footing between PC 14-16 & 18-20 Zone 1C
Level and Location for Infill Wall Between BI 126-127 (Inner) as highlighted Zone 2R
Stack Boulders Installed layers upto Levels +875.20, +875.80 & +876.20, at 1st line of boulders, at Le
Stack Boulders Layer Installed (At level +877.50), At Bottom Left Side of Mist Garden, At Highlighted
Stack Boulders Installed 3rd layer at Step 5, (upto level 877.50), Left side of Geyser Garden, at Wate
Inspection & Compaction tests of 7th (final) Layer Backfilling (Sub-Grade) (Out of 7 layers) along t
Inspection & Compaction tests of 7th Layer Backfilling (Sub-Grade) (Out of 8 layers) along the Wall (Ou
Single layer 4mm thk Modified Bituminous Water Proofing Membrane for boundary wall Foundation (In
Stack Boulders Installed 7th Layer at level +878.28, Between Boat Garden and Boundary wall span (11
Inspection & Compaction tests of 5th (final) Layer Backfilling (Sub-Grade) (Out of 5 layers) along th
Inspection & Compaction tests of 4th (Final) Layer Backfilling (Sub-Base) (Out of 4 layers Sub Base fr
Stack Boulders Installed 5 layers at 1 place, upto levels +876.85, 877.20, 877.50, 878.10 & 878.40,
Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Base) (Out of 4 layers Sub Base from level
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Base) (Out of 4 layers Sub Base from leve
Inspection for Installation of Stone Cladding and grouting, without Copping for Wing Wall of Existing Cul
"Inspection of Grouting (Vertical Joints) for Rock Boulder - RB-152 for All Layers"
"Inspection of Grouting (Horizontal Joints) for Rock Boulder - RB-152 for All Layers"
Installation of Rock and Boulder No. RB-166 (Wadi Area) - Flower Beds, Steps for Completion, as per
Inspection of Sand Bedding under pipe for Fire & Security Distribution Line from G/FS/19 to G/FS/40 at
Inspection of Sand Bedding under pipe for Telecommunication Line between G/TL/16 to G/TL/26 at Zone
Inspection of Sand Bedding under pipe for MV Line from G/MV/05 TO G/MV/13 at Zone-G as highlighted
Excavation for MV Line from G/MV/02 TO G/MV/05 at Zone-G including Pit G/MV/02, G/MV03, G/MV/27
"Inspection and Compaction Test for 9th Layer (9 of 14) Backfilling around SBC-06 (Stock Pile # 129 A-1
"Inspection and Compaction Test for 12th Layer (12 of 14) Backfilling around SBC-06 (Stock Pile # 129 A-
Inspection of backfilling Gravel around the Duct Bank of MV Line from B/MV/13 to G/MV/22 at Zone-B &
Inspection of Backfilling Gravel around the Duct Bank of MV Line from G/MV/22 to G/MV/06 at Zone- G
Inspection of Water Proofing for the Duct Bank of Fire & Security Distribution Line from B/FS/21 to B/F
Inspection of Water proofing for the Duct Bank of Telecommunications Line from B/TL/42 to B/TL/36 at
Inspection of Water proofing for the Duct Bank of MV Line from B/MV/09 to B/MV/21 at Zone-B (As Hig
Surface Preparation prior to start water proofing for the Duct Bank of MV Line from B/MV/09 to B/MV/
Inspection of Water proofing for the Duct Bank of MV Line from B/MV/09 to B/MV/12 at Zone-B (As Hig
Inspection of alignment for installated baseplate in crescent 2 Zone 2Q outer (as per attached)
Level and Location for BUTTRESS BIV 91, 92 Zone 2H
Level and Location for BUTTRESS BII 60 (1st with Beam) Zone 2A
Surface Preparation prior to start Waterproofing of Strip Footing Between PC 140-142-144 Zone 2H
Shuttering and Shear Connector for BUTTRESS BIV 91, 92 Zone 2H
Concreting for BUTTRESS BIV 91, 92 Zone 2H
Shuttering and Shear Connectors for BUTTRESS BII 60 (1st with Beam) Zone 2A
Concreting for BUTTRESS BII 60 (1st with Beam) Zone 2A
Two Layers of 4mm thick modified bituminous water proofing membrane For MCPE 1 WALL axis 03-2, 0
Protection layer of 4mm thick bituminous protection board For MCPE 1 WALL axis 03-2, 03S TO 02AP Z
Surface Preparation and Solvent base primer For MCPE 1 WALL axis 02AP, 03-2 to 03-1 Zone 2N 2M (as
Concreting for RING BEAM (inner) Axis 02-1, 02AW to 02AZ Zone 2Q
Protection layer of 4mm thick bituminous protection board For MCPE 1 WALL axis 02AP, 03-2 to 03-1 Z
Protectiol layer of geotextile and 50mm screed under TUNNEL 1 Foundation Zone 1C (as Highlighted)
Surface Preparation and Solvent base Primer TUNNEL 1 wall Negative shutter Zone 1C (as Highlighted)
Two layer of modified bituminous waterproofing membrane for TUNNEL 1 wall Negative shutter Zone 1C
Protection layer of 4mm thick bituminous protection board for TUNNEL 1 wall Negative shutter Zone 1C
Two Layers of 4mm thick modified bituminous waterproofing mambrane For MCPE 1 WALL axis 02AP, 03
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 4 layers) Inside Whisperi
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 3 layers) Surround the Seat
Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Grade) (Out of 6 layers) for 1 Curved Wall
Inspection & Compaction tests of 5th Layer Backfilling (Sub-Grade) (Out of 6 layers) for 1 Curved Wall
Concrete Pouring & Shuttering for Temporary Prop Foundation for Steel Structure Erection, at Plinth 1
Inspection & Compaction tests of 4th Layer Backfilling (Sub-Grade) (Out of 5 layers) along the Bound
Stack Boulders Installed Miscellaneous layers at Top Left Side 1 Layers (at level +878.00) and at Bott
Stack Boulders Installed 2nd layer at Step 1, (upto level 875.45), Left side of Geyser Garden, at Wate
Inspection of Plastering for External wall at grid (6/E-F) at Management Building, as highlighted in at
Sand Cover Protection & Warning Tiles on Fire Alarm & Security Lines, Telecom Lines, Emergency Lines
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 3 layers Sub grade and Fina
Inspection & Compaction Tests of 4th Layer Sub Garde Backfilling (Out of 5 Layers) along the Boundar
Inspection and compaction test 2nd layer (subgrade) for backfilling at MCPE 3 Zone 2E 2F (as highlighted
Level and Location for BUTTRESS BIV 85, 86 Zone 2F 2G
Level and Location for BUTTRESS BOI 03 Zone 1A
Inspection and compaction test 1st layer (subgrade) for backfilling at MCPE 3 Zone 2E 2F (as highlighted
Inspection for Installation Of Isolation Potable Water Line Pit F/PW/04, F/PW/05, F/PW/06, F/PW/07 - as
Shuttering and Shear Connector for BUTTRESS BIV 85, 86 Zone 2F 2G
Concreting for BUTTRESS BIV 85, 86 Zone 2F 2G
Steel Reinforcementfor MCPE 3 WALL at axis 02S to 02R, 03-1 to 03-2 Zone 2E 2F (as highlighted)
Concreting for RING BEAM (Inner) Axis 02-2, 02J to 02N Zone 2D
Steel Reinforcements for MCPE 2 Wall Axis 02Y to 03E (as Highlighted) Zone 2G 2H
Surface Preparation prior to start Waterproofing and Solvent Base Primer of Tunnel 1 Wall (connectin
Two Layers of 4mm thick modified Bituminous Water Proofing Membrane of Tunnel 1 Wall (connecting
Protection layer of 4mm thick bituminous protection Board of Tunnel 1 Wall (connecting MCPE 2) Zone
Shuttering and Shear Connector for BUTTRESS BOI 03 Zone 1A
Concreting for BUTTRESS BOI 03 Zone 1A
Inspection of Sand Bedding under pipe for Telecommunication Line from G/TL/45 to K/TL/06 at Zone-G &
Inspection of Sand Bedding under pipe for Fire & Security Distribution Line from G/FS/46 to K/FS/12, at
"Inspection of Grouting (Horizontal Joints) for Rock Boulder - RB-266c for All Layers"
"Inspection of Grouting (Vertical Joints) for Rock Boulder - RB-266c for All Layers"
"Inspection of Grouting (Horizontal Joints) for Rock Boulder - RB-269 for All Layers"
"Inspection of Grouting (Vertical Joints) for Rock Boulder - RB-269 for All Layers"
Inspection of Concrete (Plain) Pouirng for the Duct Bank of Fire & Security Distribution Line between B
Inspection of Concrete (Plain) Pouring for the Duct Bank of Telecommunications Line from B/TL/35 to G
Inspection of Concrete Pouring for the Walls & Top Slab of Transition Area - SBC-01 (As Highlighted)
"Inspection of Formwork for the Walls & Top Slab of Transition Area - SBC-01 (As Highlighted)"
"Inspection and Compaction Test for 8th Layer (8 of 14) Backfilling around SBC-06 (Stock Pile # 129 A-1
"Inspection and Compaction Test for 11th Layer (11 of 14) Backfilling around SBC-06 (Stock Pile # 129 A-
Inspection for Blinding Concrete under Potable Water Line Pit G/PW/02, G/PW/07, K/PW/01, K/PW/02
Inspection for Rough Grading (Cut & Fill) upto (-40cm) from the Final Grading Level at Zone - C & H (Nea
Inspection and Compaction Test for 4th Layer (4 of 4) backfilling (grading) at Zone - C&H (Near Crescent
Surface Preparation prior to start water proofing for the Duct Bank of MV Line from B/MV/09 to B/MV/
Inspection and Compaction Test for Backfilling Sub-grade 1st Layer (1 out of 3) above gravel around th
Installation of Rock and Boulder No. RB-152 - 3rd layer (3 of 3)
"Inspection of Grouting (Horizontal Joints) for Rock Boulder - RB-157 for All Layers"
"Inspection of Grouting (Vertical Joints) for Rock Boulder - RB-157 for All Layers"
"Inspection of Grouting (Horizontal Joints) for Rock Boulder - RB-255 for All Layers"
"Inspection of Grouting (Vertical Joints) for Rock Boulder - RB-255 for All Layers"
Installation of Rock and Boulder No. RB-152 - 2nd layer (2 of 3)
Inspection of Sand Bedding under pipe for Potable Water Line branch at Zone-F - as highlighted (SP # 67
"Inspection of Sand Bedding under pipe for Potable Water Line branch at Zone-B as highlighted (SP # 67
"Inspection of Sand Bedding under pipe for Potable Water Line branch at Zone-F as highlighted (SP # 67
Inspection of Sand Bedding under pipe for MV Line from F/MV/08 TO F/MV/03 at Zone-F as highlighted
Inspection of Sand Bedding under pipe for MV Line from F/MV/04 TO F/MV/11 at Zone-F as highlighted
"Inspection for Installation Of Isolation Potable Water Line Pit F/PW/09, F/PW/10, as highlighted "
Inspection of Sand Bedding under pipe for MV Line from F/MV/05 TO F/MV/06 at Zone-F as highlighted
Inspection of Sand Bedding under pipe for MV Line FROM G/MV/12 TO K/MV/04 at Zone-G & K as highlig
Excavation for MV Line from G/MV/05 TO G/MV/12 at Zone-G including Pit G/MV/05, G/MV/16, G/MV/12
Inspection and Compaction Test for 3rd Layer (3 of 4) backfilling (grading) at Zone - C&H (Near Crescent
Inspection for Backfilling Sub-base under Boulder no. RB-273 (Stock Pile # 110 A-1-A)
Inspection for Backfilling Sub-base under Boulder no. RB-271 (Stock Pile # 110 A-1-A)
Excavation for Foul Water Line Branch from FW-A-13-7 prior to start Gravel Bedding (as Highlighted)
Excavation for Potable Water Line (Branch) at Zone- K including Pit - K/PW/03 - as highlighted
"Inspection and Compaction Test for 7th Layer (7 of 14) Backfilling around SBC-06 (Stock Pile # 129 A-1
"Inspection and Compaction Test for 10th Layer (10 of 14) Backfilling around SBC-06 (Stock Pile # 129 A-
Installation and Survey Report for Location and Levels of Anchor Bolts for RING BEAM (outer) Axis 02-
Inspection and compaction test 7th layer for backfilling Beside Strip Footing and PC 22-24-26 Zone 1D (a
Inspection and compaction test 5th layer for backfilling around PC 165 Zone 2M (as highlighted) (5 of 5
Inspection and compaction test 4th layer for backfilling around strip footing between PC 193-195 Zone 2
Level and Location for RING BEAM (outer) Axis 02-2, 02AP to 02AT Zone 2N
Level and Location for Blinding under Foundation of LARGE MOSQUE Zone 1G (as Highlighted) (2nd)
Level and Location for BUTTRESS BOI 84, 85, 86, 87 (with beam) Zone 2G 2F
Shuttering for RING BEAM (outer) Axis 02-2, 02AP to 02AT Zone 2N
Steel Reinforcements for RING BEAM (outer) Axis 02-2, 02AP to 02AT Zone 2N
Concreting for Blinding under Foundation of LARGE MOSQUE Zone 1G (as Highlighted) (2nd)
Concreting for BUTTRESS BIV 95 Zone 2J
Shuttering for BUTTRESS BOI 84, 85, 86, 87 Zone 2G 2F
Concreting for BUTTRESS BOI 84, 85, 86, 87 (with beam) Zone 2G 2F
Concrerting for Blinding of MCPE 4 Foundation Zone 1N (as highlighted)
Anti Termite Application under Blinding of LARGE MOSQUE Foundation Zone 1G (as highlighted) (2nd)
Shuttering for Blinding under Foundation of LARGE MOSQUE Zone 1G (as Highlighted) (2nd)
Stack Boulders Installed Layer (At level +877.05), At Bottom Left Side of Mist Garden, At Highlighted
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 4 layers and single layer
Inspection & Compaction Tests of 1st Layer Sub Garde Backfilling (Out of 4 Layers) along the Boundary
Inspection & Compaction Tests of Single Layer Sub Garde Backfilling (Start from Bottom of Blinding) alo
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 6 layers) for 1 Curved Wall
Inspection & Compaction tests of 4th Layer Backfilling (Sub-Grade) (Out of 6 layers) for 1 Curved Wall
Steel Reinforcement for Temporary Prop Foundation for Steel Structure Erection, at Plinth 10 & 11, In
Concrete Pouring & shuttering for Temporary Prop Foundation for Steel Structure Erection, at Plinth 3
Concrete pouring & Shuttering for Temporary Prop Foundation for Steel Structure Erection, at Plinth 2
Excavation & Soil Preparation Prior to Stack Boulders, at Between Boat Garden & Culvert, Inside Wate
Excavation & Soil Preparation Prior to Stack Boulders, at Bottom Left Side of Geyser Garden, at highl
Excavation & Soil Preparation Prior to Stack Boulders, at 2nd to 5th line of boulders at Bottom Right
Inspection & Compaction tests of Final Layer Backfilling (Sub-Base) (after 3 layers of Sub Grade from
Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Grade) (Out of 3 layers and single layer
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 3 layers and single layer
Inspection & Compaction tests of 6th Layer Backfilling (Sub-Grade) (Out of 8 layers) along the Wall (Ou
Inspection & Compaction tests of 7th Layer Backfilling (Sub-Grade) (Out of 8 layers) along the Wall (Ou
Surface preparation prior to Backfillling along the Boundary Wall (Outer side) @ Grid (EXC1-05 to EX
Inspection & Compaction tests of 6th Layer Backfilling (Sub-Grade) (Out of 7 layers) along the Boun
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 4 layers) Inside Whisperin
Steel Reinforcement for Wall & Column of Boundary wall @ span 2 at Water Garden, as highlighted i
Steel Reinforcement for Temporary Prop Foundation for Steel Structure Erection, at Plinth 3, Inside A
Steel Reinforcement for Temporary Prop Foundation for Steel Structure Erection, at Plinth 2 & 6, Insi
Coordinates & Levels for Wall & Column of Boundary wall @ span 2 at Water Garden, as highlighted
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 2 layers and single layer
Pipe Installation of Strom Water Line OUTFAL-G for (315mmØ-UPVC Pipes-Class 4) from ( Catch Basin Pip
Bedding of Gravel 3/8" and Geotextile Surrounding Strom Water Line OUTFAL-G for (315mmØ-UPVC Pipe
Warning Tape Installation for Foul Water Line for (160mmØ - UPVC- Class 4) from (FW-A-20 to Pump St
300 mm Gravel 3/8" Backfilling and Geotextile for Foul Water Line for (160mmØ - UPVC- Class 4) from
Warning Tape Installation for Foul Water Line for (315mmØ - UPVC- Class 4) from (FW-A-06 to FW-A-
300 mm Gravel 3/8" Backfilling and Geotextile for Foul Water Line for (315mmØ - UPVC- Class 4) fr
Installation of Rock and Boulder No. RB-152 - 1st layer (1 of 3)
Installation of Rock and Boulder No. RB-269 - 4th Layer (4 of 4)
Installation of Rock and Boulder No. RB-255 - 4th Layer (4 of 4)
"Inspection of Grouting (Horizontal Joints) for Rock Boulder - RB-261 for All Layers"
"Inspection of Grouting (Vertical Joints) for Rock Boulder - RB-261 for All Layers"
Installation of Rock and Boulder No. RB-269 - 3rd layer (3 of 4)
Installation of Rock and Boulder No. RB-269 - 2nd layer (2 of 4)
INSPECTION OF INSTALLATION OF ALL RINGS (RAISER) AND SLAB FOR FW-A-07 (AS ATTACHED)
Excavation for Fire & Security Distribution Line from G/FS/19 to G/FS/44, including Pit G/FS/19, G/FS/2
Excavation for Telecommunication Line between G/TL/16 to G/TL/27 including pit G/TL/16, G/TL/41, G/
"Inspection and Compaction Test for MV line from F/MV/11 to F/MV/06 at Zone-F (Stock Pile # 97 A-1-B
"Inspection For Manhole Base Installation And UPVC Pipe Connection For FW-A-07, FW-A-09 as highlight
Inspection of Formwork for the Duct Bank of MV Line from G/MV/35 to G/MV/34 at Zone-G (As Highligh
Inspection of Formwork for the Duct Bank of MV Line from G/MV/09 to G/MV/10 at Zone-G (As Highligh
Inspection of Steel Reinforcement for the Duct Bank of MV Line from G/MV/35 to G/MV/34 at Zone-G (A
Inspection of Steel Reinforcement for the Duct Bank of MV Line from G/MV/09 to G/MV/10 at Zone-G (A
"Inspection and Compaction Test for 6th Layer (6 of 14) Backfilling around SBC-06 (Stock Pile # 129 A-1
"Inspection and Compaction Test for 9th Layer (9 of 14) Backfilling around SBC-06 (Stock Pile # 129 A-1-
"Inspection of Sand bedding for Potable Water Line at Zone-G & K - as highlighted (Stock Pile # 67) "
"Inspection of Sand Bedding for Potable Water Line at Zone-G - as highlighted (Stock Pile # 67)"
Inspection and Compaction Test for 2nd Layer (2 of 2) Backfilling under Boulder No. RB-273 (Stock Pile #
Inspection and Compaction Test for 2nd Layer (2 of 2) Backfilling under Boulder No. RB-271 (Stock Pile #
"Inspection for Casting the Blinding Concrete under the Manhole for FW-A-7, FW-A-8, FW-A-9 (as Highli
"Inspection of Steel Reinforcement for the Slab of Transition Area - SBC-01 (As Highlighted)"
Inspection and Compaction Test for 2nd Layer (2 of 4) backfilling (grading) at Zone - C&H (Near Crescent
Inspection and compaction test 6th layer for backfilling Beside Strip Footing and PC 22-24-26 Zone 1D (a
Inspection and compaction test 3rd layer for backfilling LARGE MOSQUE (as Highlighted) Zone 1G (3rd of
Level and Location for MCPE 2 WALL (OUTER ) at axis 03J to 02AB Zone 2H (as highlighted)
Level and Location for MCPE 3 WALL (OUTER ) at axis 02S to 02R Zone 2E 2F (as highlighted)
Level and Location for Blinding under Foundation of LARGE MOSQUE Zone 1G (as Highlighted)
Steel Reinforcements For MCPE 1 Inner (w/out counter fort) Wall Axis 03-T - 03-S, 03-2 (as Highlighte
Concreting for MCPE 2 Foundation (connecting tunnel) Axis 03I1 to 02AA Zone 2G 2H (as highlighted)
Surface Preparation and Solvent Base Primer for MCPE 2 outer Wall Axis 03-2, 02AH to 03L (as Highligh
Shuttering for MCPE 3 WALL (OUTER ) at axis 02S to 02R Zone 2E 2F (as highlighted)
Concreting for MCPE 3 WALL (OUTER ) at axis 02S to 02R Zone 2E 2F (as highlighted)
Anti Termite Application under Blinding of LARGE MOSQUE Foundation Zone 1G (as highlighted)
Shuttering for Blinding under Foundation of LARGE MOSQUE Zone 1G (as Highlighted)
Concreting for Blinding under Foundation of LARGE MOSQUE Zone 1G (as Highlighted)
Shear Connector for Inner RINGBEAM at Zone 2D (as highlighted)
Installation of Rock and Boulder No. RB-269 - 1st layer (1 of 4)
Installation of Rock and Boulder No. RB-266c - 4th layer (4 of 4)
Inspection and compaction test 5th layer for backfilling Beside Strip Footing and PC 22-24-26 Zone 1D (a
Installation of Rock and Boulder No. RB-266c - 3rd layer (3 of 4)
Inspection and compaction test 4th layer for backfilling around PC 165 Zone 2M (as highlighted) (4 of 5
"Surface Preparation prior to start water proofing for the Duct Bank of Telecommunications Line from B
Inspection and compaction test 2nd layer for backfilling red sand @ MCPE 3 Zone 2E 2F (as highlighted)
Surface Preparation prior to start Water Proofing for the Duct Bank of Fire & Security Distribution Lin
Surface Preparation prior to start backfilling for the Duct Bank of MV Line from B/MV/13 to G/MV/22 a
Inspection of Formwork for Canopy Foundation of Seating Area (1) Zone-K & L (SA-15, SA-16, SA-17 ) - A
Inspection and compaction test 2nd layer for backfilling LARGE MOSQUE (as Highlighted) Zone 1G (2nd o
Installation and Survey Report for Location and Levels of Anchor Bolts for RING BEAM (Inner) Axis 02-1
Level and Location for BUTTRESS BOI BII 52 (2nd) Zone 1N
Inspection of Casting Blinding Concrete under Canopy Foundation of Seating Area (1) Zone-G (SA-10, SA-
Level and Location for BUTTRESS BOI 20, 21 Zone 1E 1F
Surface Preparation prior to start backfilling for the Duct Bank of MV Line from G/MV/22 to G/MV/06 at
Level and Location for BUTTRESS BIV 87, 88, 89, 90 Zone 2H 2G
Inspection and Compaction Test for 1st Layer (1 of 2) Backfilling under Boulder No. RB-273 (Stock Pile #
Concrete Pouring & Shuttering for Temporary Prop Foundation for Steel Structure Erection, at Plinth 4
"Inspection for casting concrete for short piece and Surface Preperation prior to start waterproof
Level and Location for BUTTRESS BIV BOV 53 (2nd) Zone 1N
Steel Reinforcement for Temporary Prop Foundation for Steel Structure Erection, at Plinth 4, Inside A
Level and Location for BUTTRESS BIV BOV 59 (1st) Zone 2A
Surface Preparation prior to Backfilling Inside Whispering Cave 1 & 2, (From Bottom of Blinding Leve
INSPECTION OF INSTALLATION OF SLAB FOR MH-G-05 (AS ATTACHED)
Shuttering and Shear Connectors for BUTTRESS BOI BII 52 (2nd) Zone 1N
Steel Reinforcement for Ring Beam & Remaining part of Wall @ Grid (10-16/Right Side) or Grid 11 to
Inspection And Compaction Test For Backfilling 12th Layer (12 of 12) For Foul Water Line From FW-A-3-
Inspection And Compaction Test For Backfilling 8th Layer (8 of 8) For Foul Water Line From FW-A-3-6.4
Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Grade) (Out of 5 layers) along the Bound
Concreting for BUTTRESS BOI BII 52 (2nd) Zone 1N
"Inspection And Compaction Test of Backfilling Sub Grade Above Gravel (9th Layer out of 9) around th
"Inspection And Compaction Test of Backfilling Sub Grade Above Gravel (8th Layer Out of 8) Around T
Concreting for BUTTRESS BOI 20, 21 Zone 1E 1F
Inspection And Compaction Test For Backfilling Subgrade 7th Layer (7 of 7) For Foul Water Line From
Inspection & Compaction tests of One Layer Backfilling (Sub-Base), from level +875.50 to +875.75, (Aft
Shuttering and Shear Connectors for BUTTRESS BIV 87, 88, 89, 90 Zone 2H 2G
Concrerting for BUTTRESS BIV 87, 88, 89, 90 Zone 2H 2G
Shuttering and Shear Connectors for BUTTRESS BOI 20, 21 Zone 1E 1F
Shuttering and Shear Connectors for BUTTRESS BIV BOV 53 (2nd) Zone 1N
Concreting for BUTTRESS BIV BOV 53 (2nd) Zone 1N
Shuttering and Shear Connector for BUTTRESS BIV BOV 59 (1st) Zone 2A
Concreting for BUTTRESS BIV BOV 59 (1st) Zone 2A
"Inspection and Compaction Test for 5th Layer (5 of 9) Backfilling around SBC-06 (Stock Pile # 129 A-1-B
"Inspection and Compaction Test for 8th Layer (8 of 9) Backfilling around SBC-06 (Stock Pile # 129 A-1-B
Stack Boulders Installed 5th & 6th layer (At level +876.45 & +876.65), At small area at Left Side Bet
Stack Boulders Installed 1st layer at Step 1, (upto level 875.15), Left side of Geyser Garden, at Wate
Stack Boulders Installed 2nd layer at Step 1, at level +875.45, at Right side of Geyser Garden, at Wat
Stack Boulders Installed 9th layer at Level +879.00, (Part 4) along Planted Bed 2 to 3 and above, Ins
Stack Boulders Installed 2 layers upto Levels +875.20 & +875.70, at 1st line of boulders, at Left Side
Stack Boulders Installed 2 layers upto Levels +877.10 & +877.60, (5th & 6th Line Between Planter Box
Stack Boulders Installed 6th Layer at level +877.88, Between Boat Garden and Boundary wall span (9 t
Stack Boulders Installed 3 layers upto Levels +877.60, +878.00 & +878.50, at 5th line of boulders, at
Plaster Guide Points & Accessories for Plastering of walls Inside Disabled Toilet (GF-5046), Toilets
Installation of straight UPVC Conduit (4x110mm) for TELECOM Duct Bank (DB no.KK/D-TL/28,KK/D-TL/
Installation of straight UPVC Conduit (2x110mm) for Fire and Security Duct Bank (DB no.KK/D-FS/18
Installation of Rock and Boulder No. RB-266c - 2nd layer (2 of 4)
Inspection of Grouting (Vertical & Horizontal ) for Rock Boulder - RB-166 (Wadi Area) for All Layers as
Inspection of Grouting (Vertical & Horizontal) for Rock Boulder - RB-139 (Wadi Area) for All Layers as
Inspection of Casting (Plain) Concrete for the Duct Bank of MV Line from G/MV/10 to G/MV/31 at Zone-
Inspection of Casting (Plain) Concrete for the Duct Bank of MV Line from G/MV/34 to G/MV/09 at Zone-
Inspection for Backfilling Sub-base under Boulder no. RB-152 (Stock Pile # 110 A-1-A)
Soil Preparation under Boulder No. RB- 152
Soil Preparation under Boulder No. RB- 273
Excavation for Potable Water Line branch at Zone-F including Pit - F/PW/10, F/PW/11 - as highlighted
"Excavation for Potable Water Line branch at Zone-B including Pit - B/PW/04 - as highlighted "
"Excavation for Potable Water Line branch at Zone-K including Pit - K/PW/05 - as highlighted "
Excavation for Foul Water Line Branch from FW-A-13-6 prior to start Gravel Bedding (as Highlighted)
Excavation for Foul Water Line Branch from FW-A-13-5 prior to start Gravel Bedding (as Highlighted)
Excavation for Foul Water Line Branch from FW-A-13-5 prior to start Gravel Bedding (as Highlighted)
Inspection for Blinding Concrete under Potable Water Line Pit F/PW/05, F/PW/06, F/PW/09, F/PW/10,
Inspection and Compaction Test for 1st Layer (1 of 2) Backfilling under Boulder No. RB-271 (Stock Pile #
Soil Preparation under Boulder No. RB- 271
Inspection and Compaction Test for Sub-Base under Canopy Foundation of Seating Area (1) Zone-G (SA-1
Excavation for MV Line from K/MV/02 TO K/MV/04 at Zone-K & L including Pit K/MV/02, L/MV08, K/MV/
Inspection and Compaction Test for 1st Layer (1 of 4) backfilling (grading) at Zone - C&H (Near Crescent
Inspection of Backfilling subgrade above Gravel 1st Layer (1 out of 4) around the Manhole for FW-A-
"Inspection and Compaction Test for 4th Layer (4 of 9) Backfilling around SBC-06 (Stock Pile # 129 A-1-B
Inspection of Water Proofing for the Duct Bank of MV Line from G/MV/22 to G/MV/06 at Zone- G (As Hi
Inspection of Water Proofing for the Duct Bank of MV Line from B/MV/13 to G/MV/22 at Zone-B & G (As
Inspection of Water Proofing for the Duct Bank of MV Line from B/MV/13 to B/MV/06 at Zone-B (As Hig
Installation of straight UPVC Conduit (Dia.32mm) for Power(Socket Outlet) at Crescent-02 (Buttress Axi
Installation of straight UPVC Conduit (Dia.32mm) for Power(Socket Outlet) at Crescent-02 (Buttress Axi
Installation of straight UPVC Conduit (Dia.25mm) and Box for Security (CAM) at Buttress Axis (02/1Z)
Installation of straight UPVC Conduit (Dia.25mm) and Box for Voice and Data (WIFI & CAM) at Buttress
Installation of straight UPVC Conduit (Dia.25mm) and Box for Fire Alarm (Speaker ) at Buttress Axis (0
Installation of straight UPVC Conduit (Dia.25mm) and Box for Fire Alarm (Speaker ) at Buttress Axis (0
Isnspection of Water Proofing for the Duct Bank of MV Line from B/MV/07 to B/MV/10 at Zone-B (As Hi
Excavation for MV Line from F/MV/04 TO F/MV/05 at Zone-F including Pit F/MV/04, F/MV/11, F/MV/06,
Level and Location for Strip Footing between PC 22-24-26 Zone 1D
Surface Preparation prior to Backfilling along the Boundary Wall (Outer Sides) of span 1 & 49 (From
"Inspection and Compaction Test for 7th Layer (7 of 9) Backfilling around SBC-06 (Stock Pile # 129 A-1-B
Sand Cover Protection & Warning Tiles on Fire Alarm & Security Lines, Telecom Lines, Emergency Lines
Level and Location for MCPE 2 WALL (OUTER ) at axis 03I to 02Z Zone 2H (as highlighted)
Level and Location for RING BEAM (Inner) Axis 02-2, 02J to 02N Zone 2D
Inspection and compaction test 4th layer for backfilling Beside Strip Footing and PC 22-24-26 Zone 1D (a
Inspection and compaction test 3rd layer for backfilling around PC 165 Zone 2M (as highlighted) (3 of 4
Concrete Pouring & Shuttering for Wall & Column of Boundary wall @ span 2 at Water Garden, as hig
Inspection and compaction test 3rd layer for backfilling around strip footing between PC 193-195 Zone 2
Stone Coping on Boundary wall (after Stone Cladding for walls) @ Span 14, 15, 16 & 17 of Water Gard
Inspection and compaction test 1st layer for backfilling red sand @ MCPE 3 Zone 2E 2F (as highlighted) (
Inspection and compaction test 1st layer for backfilling LARGE MOSQUE along axis 6 (as Highlighted) Zon
Stack Boulders Installed 3rd layer upto Level +879.00, at 6th line of boulders, at Left Side of Planted
Stack Boulders Installed 2 layers upto Levels +876.20 & +876.60, at 5th Line of boulders, at Inside G
Stack Boulders Installed 2nd layer at Step 5, (upto level 877.05), Left side of Geyser Garden, at Wate
Inspection and compaction test 1st layer (SubGrade) for backfilling LARGE MOSQUE (as Highlighted) Zone
Concrete Pouring & Shuttering for Temporary Prop Foundation for Steel Structure Erection, at Plinth 9
Inspection and compaction test 6th layer for backfilling LARGE MOSQUE along axis 6 (as Highlighted) Zo
Stone Coping on Boundary wall (after Stone Cladding for walls) @ Span 18, 19, 20, 21 & 22 of Water
Steel Reinforcements for Strip Footing between PC 22-24-26 Zone 1D
Shuttering for Strip Footing between PC 22-24-26 Zone 1D
Stone Cladding for wall (All Sides) At 1 Straight Wall (Left Side) at Entrance and Circular wall 1 (Half
Concrete Pouring & Shuttering for Temporary Prop Foundation for Steel Structure Erection, at Plinth 5
Stack Boulders Installed 3 layers at Levels (+877.10, +877.60 & +878.00), (Small area) for 2nd to 4th
Concreting for Strip Footing between PC 22-24-26 Zone 1D
Shuttering for MCPE 2 WALL (OUTER ) at axis 03I to 02Z Zone 2H (as highlighted)
Concreting for MCPE 2 WALL (OUTER ) at axis 03I to 02Z Zone 2H (as highlighted)
Steel Reinforcements for RING BEAM (Inner) Axis 02-2, 02J to 02N Zone 2D
Shuttering for RING BEAM (Inner) Axis 02-2, 02J to 02N Zone 2D
Steel Reinforcements for MCPE 1 WALL & counterfort (INNER) at axis 03R to 03S Zone 2M 2N (as highlig
Steel Reinforcements for BUTTRESS BII 03 Zone 1A
Pipe Installation of Foul Water Line for (315mmØ - UPVC- Class 4) from (FW-A-06 to FW-A-09). At CR
Bedding of Gravel 3/8" and Geotextile Surrounding Foul Water Line for (315mmØ - UPVC- Class 4) fr
Warning Tape Installation for Storm Water Line- Outfall X & Outfull-B for (450mmØ-UPVC- Class 4) of
Pipe Installation of Foul Water Line for (160mmØ - UPVC- Class 4) from (FW-A-20 to Pump Station). A
Bedding of Gravel 3/8" and Geotextile Surrounding Foul Water Line for (160mmØ - UPVC- Class 4) fro
Pipe Installation of Sub-Surface Drainage (Main Line & Branches) Pipes; (110mmØ, UPVC-CLASS-4); A
Installation of straight UPVC ducts (2x160mm) Low Voltage Network (Submain Cables R2/LV1-06 betw
Stack Boulders Installed 5th & 6th layer (At level +876.25 & +876.65), At small area at Left Side Bet
Stack Boulders Installed 2nd layer at Step 2, 3 & 4, (upto level 875.85, 876.25 & 876.65), Left side o
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 5 layers) along the Bound
Inspection & Compaction tests of Single (Final) Layer Backfilling (Sub-Base) (After laying Single laye
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 3 layers and single layer
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 6 layers) for 1 Curved Wall
Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Grade) (Out of 6 layers) for 1 Curved Wall
Steel Reinforcement for Temporary Prop Foundation for Steel Structure Erection, at Plinth 9, Inside A
Stack Boulders Installed 3 layers at Levels (+877.60, +878.00 & +878.50) Beside Planter Box, betwee
Excavation & Soil Preparation Prior to Stack Boulders at Bottom Left Side of Geyser Garden, at highli
Inspection and compaction test 3rd layer for backfilling Beside Strip Footing and PC 22-24-26 Zone 1D (a
Inspection and compaction test 2nd layer for backfilling around PC 165 Zone 2M (as highlighted) (2 of 4
Inspection and compaction test 4th layer for backfilling around PC 27, 29 Zone 1E (as highlighted) (4 of
Inspection and compaction test 2nd layer for backfilling around strip footing between PC 193-195 Zone 2
Surface Preparation Prior to start Backfilling at MCPE 3 Zone 2E 2F axis 02R to 03A (as highlighted)
Installation and Survey Report for Location and Levels of Anchor Bolts for CANOPY @ BII 03 Zone 1A (as
Level and Location for BUTTRESS BOI 62, 63 (2nd) Zone 2A 2B
Inspection of Grouting (Vertical & Horizontal ) for Rock Boulder - RB-166 (Wadi Area) for All Layers,
Installation of Rock and Boulder No. RB-157 - 5th layer (5 of 5)
Inspection for Installation Of Isolation Potable Water Line Pit B/PW/04, B/PW/06, B/PW/07, B/PW/08 - a
Inspection of Backfilling Gravel 2nd Layer (2 out of 3) around the Manhole for FW-A-18 - as Highlighted
Inspection for backfilling gravel 1st Layer (1 of 1) around the Duct Bank of MV Line from B/MV/19 to
Excavation for Potable Water Line at Zone-G&K including Pit - K/PW/01 - as highlighted
Excavation for Potable Water Line at Zone-G including Pit - G/PW/02 - as highlighted
Inspection And Compaction Test For Backfilling Gravel 1st Layer (1 of 2) Around Manhole MH-F-01-1,
"INSPECTION FOR INSTALLATION OF GULLIES FOR - G-E-05, G-E-06, G-E-16 G-E-17 (As Highlighted) "
Inspection And Compaction Test For Backfilling 11th Layer (11 of 14) For Foul Water Line From FW-A-3-
Level and Location for BUTTRESS(with Beam) BII 03 Zone 1A
Inspection And Compaction Test For Backfilling 7th Layer (7 of 14) For Foul Water Line From FW-A-3-6.
Inspection of Backfilling Sub Grade Above Gravel (6th Layer out of 8) around the Manhole for FW-A-3-6
Inspection of Backfilling Sub Grade Above Gravel (8th Layer out of 8) around the Manhole for FW-A-3-6
Inspection of Backfilling Sub Grade Above Gravel (7th Layer Out of 7) Around The Manhole for FW-A-3-
"Inspection and Compaction Test for 3rd Layer (3 of 9) Backfilling around SBC-06 (Stock Pile # 129 A-1-B
Inspection And Compaction Test For Backfilling Subgrade 6th Layer (6 of 6) For Foul Water Line From
Surface Preparation prior to start Waterproofing for Internal Building North restaurant foundation Zone
Shuttering and Shear Connectors for BUTTRESS BOI 62, 63 (2nd) Zone 2A 2B
Concreting for BUTTRESS BOI 62, 63 (2nd) Zone 2A 2B
Single layer of 4mm thick modified bituminous waterproofing membrane for Strip Footing Between PC
Protection layer of 4mm thick bituminous protection board for Strip Footing Between PC 83-85-87-89,
Shuttering and Shear Connectors for BUTTRESS(with Beam) BII 03 Zone 1A
Concreting for BUTTRESS(with Beam) BII 03 Zone 1A
Shuttering for MCPE 2 WALL (OUTER ) at axis 03J to 02AB Zone 2H (as highlighted)
Concreting for MCPE 2 WALL (OUTER ) at axis 03J to 02AB Zone 2H (as highlighted)
Installation of Rock and Boulder No. RB-157 - 4th layer (4 of 5)
Installation of Rock and Boulder No. RB-266c - 1st layer (1 of 4)
"Inspection of Grouting (Vertical Joints) for Rock Boulder - RB-169b for All Layers"
"Inspection of Grouting (Vertical Joints) for Rock Boulder - RB-169 for All Layers"
Installation of Rock and Boulder No. RB-157 - 3rd layer (3 of 5)
Inspection of Backfilling Sub-grade above gravel 3rd Layer (3 out of 5) around the Manhole for FW-A-3-
"INSPECTION FOR INSTALLATION OF GULLIES G-G-38, G-G-39, G-G-41, G-G-43, G-G-46 as highlighted "
Inspection of Backfilling Sub-grade Above Gravel 1st Layer (1 out of 4) around the Manhole for MH-K-7
Inspection And Compaction Test For Backfilling Subgrade 5th Layer (5 of 6) For Foul Water Line From
Excavation and Soil Preparation under Canopy Foundation of Seating Area (1) at Zone-G (SA-10, SA-11, S
Soil Preparation prior to start Cutting and Backfill (-40cm from FGL) at Zone - C & H (Near Crescent) as h
"Inspection of Backfilling Gravel 1st Layer ( 1 out of 2) For GULLIES - G-F-1, G-F-2, G-F-3, G-F-4, G-F-5
"Inspection of Backfilling Gravel 2nd Layer (2 out of 2) around the Manhole for MH-E-01, MH-E-02, MH
"INSPECTION FOR INSTALLATION OF ALL RINGS (RISER) FOR MH-G-06 (As Highlighted)"
"Inspection and Compaction Test for 6th Layer (6 of 9) Backfilling around SBC-06 (Stock Pile # 129 A-1-B
"Inspection of Backfilling Gravel 1st Layer (1 out of 3) around the Manhole for FW-A-18 - as Highlighted
"Inspection of Backfilling Gravel 2nd Layer (2 out of 3) around the Manhole for FW-A-25, FW-A-24, F
"Inspection For Manhole Base Installation And UPVC Pipe Connection For MH-G-06 as highlighted "
"INSPECTION FOR INSTALLATION OF ALL RINGS (RISER) FOR MH-G-01-6 (As Highlighted)"
"Inspection For Manhole Base Installation And UPVC Pipe Connection For MH-G-01-6 as highlighted "
Inspection for casting concrete for short piece and Surface Preperation prior to start waterproofing fo
Inspection for casting concrete for short piece and Surface Preperation prior to start waterproofing fo
"Inspection and Compaction Test for 2nd Layer (2 of 9) Backfilling around SBC-06 (Stock Pile # 129 A-1-
"Inspection and Compaction Test for 5th Layer (5 of 9) Backfilling around SBC-06 (Stock Pile # 129 A-1-B
Excavation for Telecommunication Line between B/TL/12 to B/TL/15, including pit B/TL/15 at Zone-B as
Excavation for Fire & Security Distribution Line from B/FS/15 to B/FS/17, including Pit B/FS/17 at Zone-
Inspection for Backfilling Sub-base under Boulder no. RB-269 (Stock Pile # 110 A-1-A)
Inspection and Compaction Test for 3rd Layer (3 of 3) Backfilling under Boulder No. RB-269 (Stock Pile #
Installation of straight UPVC Conduit (Dia.32mm) for Power(Socket Outlet) at Crescent-02 (Buttress Axi
Installation of straight UPVC Conduit (Dia.32mm) for Power(Socket Outlet) at Crescent-02 (Buttress Axi
Installation of straight UPVC Conduit (Dia.32mm) for Power(Socket Outlet) at Crescent-02 (Buttress Axi
Installation of straight UPVC Conduit (Dia.32mm) for Power(Socket Outlet) at Crescent-02 (Buttress Axi
Installation of straight UPVC Conduit (Dia.25mm) and Box for Voice and Data (WIFI ) at Buttress Axis (
Installation of straight UPVC Conduit (Dia.25mm) and Box for Fire Alarm (Speaker ) at Buttress Axis (0
Installation of straight UPVC Conduit (Dia.25mm) and Box for Security (CAM ) at Buttress Axis (02/1S)
Installation of straight UPVC Conduit (Dia.25mm) and Box for Voice and Data (WIFI & CAM ) at Buttress
Installation of straight UPVC Conduit (Dia.25mm) and Box for Fire Alarm (Speaker ) at Buttress Axis (0
Installation of straight UPVC Conduit (Dia.25mm) and Box for Fire Alarm (Speaker ) at Buttress Axis (0
Installation of straight UPVC Conduit (Dia.25mm) and Box for Fire Alarm (Speaker ) at Buttress Axis (0
Installation of straight UPVC Conduit (Dia.25mm) and Box for Voice and Data (WIFI ) at Buttress Axis (
Installation of straight UPVC Conduit (Dia.25mm) and Box for Voice and Data (WIFI & CAM) at Buttress
Installation of straight UPVC Conduit (Dia.25mm) and Box for Security (CAM) at Buttress Axis (02/1U)
Sand Cover Protection & Warning Tiles on Low voltage Lines, Telecom lines, Emergency Lines and Fire
Inspection & Compaction tests of 4th Layer Backfilling (Sub-Grade) (Out of 7 layers) along the Walls (
Inspection & Compaction tests of 3rd (Final) Layer Backfilling (Sub-Grade) (Out of 3 layers) for Sub s
Steel Reinforcement for Temporary Prop Foundation for Steel Structure Erection, at Plinth 5, Inside A
Concrete Pouring & Shuttering for Temporary Prop Foundation for Steel Structure Erection, at Plinth 1
Inspection & Compaction tests of 7th Layer Backfilling (Sub-Grade) (from level +875.20) for Sub surf
Inspection & Compaction tests of Single Layer Backfilling (Sub-Grade) (Out of single layer Sub grade a
Concrete Pouring & Shuttering for Ring Beam & Remaining part of Wall @ Grid (1-3/Left Side), on Bou
Installation and Fixation of Anchor Bolts and Check Coordinates & Levels for Ring Beam @ Grid (1-3/L
Coordinates & Levels of Ring Beam & Remaining part of Wall @ Grid (1-3/Left Side), on Boundary wall
Excavation & Soil Preparation Prior to Boulders at Part 2, at Left Side of Planted Bed 2, Inside Water
Stack Boulders Installed 4 layers at Levels (+877.10, +877.60, +878.00 & +878.50) 1 Place behind plan
Inspection and compaction test 5th layer for backfilling LARGE MOSQUE along axis 6 (as Highlighted) Zo
Inspection and compaction test 4th layer for backfilling LARGE MOSQUE along axis 6 (as Highlighted) Zo
Excavation upto rock level and Surface Preparation prior Backfilling for Large Mosque Zone 1G (as highl
Level and Location for Strip Footing between PC 7 - 9 - 11 - 13 Zone 1B
Level and Location for BUTTRESS (with beam) BII 93, 94, 95, 96 Zone 2H 2J
Level and Location for MCPE 4 Foundation Zone 1N (as highlighted)
Level and Location for BUTTRESS BOV 03 Zone 1A
Level and Location for BUTTRESS(with Beam) BII 61 1st Zone 2A
Level and Location for BUTTRESS(with Beam) BII 20, 21 Zone 1E 1F
Steel Reinforcements for MCPE 2 Wall Axis 02Y to 03E (as Highlighted) Zone 2G 2H
Concreting for BUTTRESS BIV 60, 61 (2ND) Zone 2A
Concreting for BUTTRESS BII 62, 63 (1ST with Beam) Zone 2A 2B
Shuttering and Shear Connectors for BUTTRESS (with beam) BII 93, 94, 95, 96 Zone 2H 2J
Concreting for BUTTRESS (with beam) BII 93, 94, 95, 96 Zone 2H 2J
Anti Termite Application under Blinding of MCPE 4 Foundation Zone 1N (as highlighted)
Shuttering for Blinding of MCPE 4 Foundation Zone 1N (as highlighted)
Two layer of 4mm htick modified Bituminous WP membrane under TUNNEL 1 Foundation Zone 1C (as Hi
Shuttering and Shear Connectors for BUTTRESS BOV 03 Zone 1A
Concreting for BUTTRESS BOV 03 Zone 1A
Shuttering and Shear Connectors for BUTTRESS(with Beam) BII 61 1st Zone 2A
Concreting for BUTTRESS(with Beam) BII 61 1st Zone 2A
Steel Reinforcements for BUTTRESS BII BIV 91 92 Zone 2H
Shuttering and Shear Connectors for BUTTRESS(with Beam) BII 20, 21 Zone 1E 1F
Concreting for BUTTRESS(with Beam) BII 20, 21 Zone 1E 1F
Installation of straight UPVC Conduit (Dia.25mm) and Box for Voice and Data (CAM) at Crescent-01 Axis
Installation of straight UPVC Conduit (Dia.25mm) and Box for Security (CAM) at Crescent-01 Axis (01/2
Concreting & shutter of Blinding at Soak Away for South Admin Bldg. Zone 2C
Anti Termite Application under Blinding of Soak Away for South Admin Bldg. Zone 2C
Surface Preparation Prior to start Backfilling at LARGE MOSQUE along axis 6 (as Highlighted) Zone 1G
Inspection and compaction test 1st layer for backfilling LARGE MOSQUE along axis 6 (as Highlighted) Zon
Inspection and compaction test 2nd layer for backfilling LARGE MOSQUE along axis 6 (as Highlighted) Zo
Inspection and compaction test 3rd layer for backfilling LARGE MOSQUE along axis 6 (as Highlighted) Zo
Inspection and compaction test 2nd layer for backfilling Beside Strip Footing and PC 22-24-26 Zone 1D (
Inspection and compaction test 1st layer for backfilling around PC 165 Zone 2M (as highlighted) (1 of 4
Inspection and compaction test 3rd layer for backfilling around PC 27, 29 Zone 1E (as highlighted) (3 of
Inspection and compaction test 1st layer for backfilling around strip footing between PC 193-195 Zone 2
Installation of Rock and Boulder No. RB-166 (Wadi Area) - Flower Beds, Steps for Completion, as per
Inspection of Grouting for Rock Boulder - RB-139 (Wadi Area) for All Layers, Steps and Flower Beds as
Installation of Rock and Boulder No. RB-139 (Wadi Area) - Flower Beds, Steps and 1 to 9 Layer for Com
Installation of Rock and Boulder No. RB-157 - 2nd layer (2 of 5)
Excavation & Soil Preparation Prior to Stack Boulders at Bottom Right Side of Geyser Garden, at highl
Inspection And Compaction Test For Backfilling 10th Layer (10 of 14) For Foul Water Line From FW-A-3-
Level and Location for BUTTRESS BII 62, 63 (2nd) Zone 2A 2B
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 5 layers) along the Bound
Inspection And Compaction Test For Backfilling 6th Layer (6 of 14) For Foul Water Line From FW-A-3-6.
Inspection & Compaction tests of 6th Layer Backfilling (Sub-Grade) (from level +875.20) for Sub surf
Inspection of Backfilling Sub Grade Above Gravel (5th Layer out of 8) around the Manhole for FW-A-3-6
Inspection of Backfilling Sub Grade Above Gravel (7th Layer out of 8) around the Manhole for FW-A-3-6
Steel Reinforcement for Temporary Prop Foundation for Steel Structure Erection, at Plinth 1, Inside A
Inspection of Backfilling Sub Grade Above Gravel (6th Layer Out of 6) Around The Manhole for FW-A-3-
Gravel 3/8 Bedding & Geotextile Surround for Sub surface Pipes (2 no's of 110mm) Connecting to Gully
Shuttering and Shear Connectors for BUTTRESS BII 62, 63 (2nd) Zone 2A 2B
Inspection & Compaction tests of 5th Layer Backfilling (Sub-Grade) (Out of 7 layers) along the Boun
"Inspection and Compaction Test for 1st Layer (1 of 9) Backfilling around SBC-06 (Stock Pile # 129 A-1-B
COncreting for BUTTRESS BII 62, 63 (2nd) Zone 2A 2B
Inspection & Compaction tests of 6th Layer Backfilling (Sub-Grade) (Out of 8 layers) along the Wall (Ou
Inspection & Compaction tests of 5th Layer Backfilling (Sub-Grade) (Out of 8 layers) along the Wall (Ou
"Inspection and Compaction Test for 4th Layer (4 of 9) Backfilling around SBC-06 (Stock Pile # 129 A-1-B
Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Grade) (Out of 7 layers) along the Walls (
Steel Reinforcements for TUNNEL 2 Shaft wall (part A) at Zone 2F (as highlighted)
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 6 layers) for 1 Curved Wall
Surface Preparation and Solvent Base Primer for Strip Footing Between PC 83-85-87-89, 84-86-88-90 Zo
Soil preparation Prior to Backfilling along 1 Curved Wall (All Sides), Left Side at Entrance and Circul
Inspection of Casting Reinforced Concrete for the Duct Bank of MV Line between G/MV/06 to G/MV/17
Protection Layer 4mm thk Bituminous Protection Board on Waterproofing of footing & Kicker of 1 Curve
Inspection of Formwork for the Duct Bank of MV Line from G/MV/06 to near G/MV/17 at Zone-G (As Hig
Inspection of Steel Reinforcement for the Duct Bank of MV Line between G/MV/06 to G/MV/17 at Zone-
Level and Location for Strip Footing between PC 83-85-87-89 Zone 1P
Surface Preparation prior to Backfilling along the Boundary Wall (Outer Sides) of span 42, 43, 44, 45
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 3 layers) for Sub surface
Stack Boulders Installed 4th layer (At level +876.05) at Left Side Between Geyser & Mist Garden, At H
Stack Boulders Installed 3rd layer (At level +875.85) at Top Left Side of Geyser Garden and Between
Stack Boulders Installed Layer upto Level +877.10 (Part 3), at 3rd to 5th Line of Boulders, at Bottom
Stack Boulders Installed 1st layer upto Level +875.20, at Top Side of Planted Bed 1, Inside Water Pla
Stack Boulders Installed 2nd layer upto Level +878.50, at 6th line of boulders, at Left Side of Plante
Stack Boulders Installed 1st layer upto Level +878.00, at 6th line of boulders, at Left Side of Planted
Soil Preparation Prior to Start Backfill Gravel for Manhole from FW-A-18 - as Highlighted
Inspection of Casting (Plain) Concrete for the Duct Bank of MV Line from G/MV/36 to G/MV/35 at Zone-
Inspection of Formwork for the Duct Bank of MV Line from G/MV/36 to G/MV/35 at Zone-G (As Highligh
Inspection And Compaction Test For Backfilling Subgrade 4th Layer (4 of 6) For Foul Water Line From
Inspection And Compaction Test For Backfilling 6th Layer (6 of 9) For Storm Water Line From MH-K-07
Inspection And Compaction Test For Backfilling 6th Layer (6 of 9) For Foul Water Line From FW-A-3-7 T
Inspection of Backfilling Sub-grade Above Gravel 2nd Layer (2 out of 5) around the Manhole for MH-K
"Inspection of Backfilling Sub-grade above gravel 2nd Layer (2 out of 5) around the Manhole for FW
Soil Preparation prior to start backfill around SBC-06 - as highlighted
Inspection and compaction test 2nd layer for backfilling around PC 27, 29 Zone 1E (as highlighted) (2 of
Inspection for Backfilling Sub-base under Boulder no. RB-266C (Stock Pile # 110 A-1-A)
Soil Preparation under Boulder No. RB- 266C
Surface Preparation Prior to start Backfilling at PC 165 Zone 2M (as highlighted)
"Inspection and Compaction Test for 3rd Layer (3 of 9) Backfilling around SBC-06 (Stock Pile # 129 A-1-B
Inspection for application of Protection Board on top of Damp Proofing for External wall and Top Slab o
Level and Location for BUTTRESS BOV 60, 61 (2nd) Zone 2A
Inspection and Compaction Test for 2nd Layer (2 of 2) Backfilling under Boulder No. RB-269 (Stock Pile #
Inspection and Compaction Test for 1st Layer (1 of 2) Backfilling under Boulder No. RB-269 (Stock Pile #
Level and Location for Strip Footing between PC 140-142-144 Zone 2H
"Inspection of Backfilling Gravel 2nd Layer (2 out of 2) around the Manhole for MH-A-01 - as Highlighte
Surface Preparation prior to start water proofing for the Duct Bank of MV Line from G/MV/22 to G/MV/
Surface Preparation prior to start water proofing for the Duct Bank of MV Line from B/MV/13 to G/MV/
Concreting for BUTTRESS BOV 20 21 Zone 1E 1F
"Soil Preperation Prior to Start Backfill Gravel around Manhole - MH-A-02, MH-A-10 - as Highlighted"
"Inspection of Backfilling Gravel 1st Layer (1 out of 3) around the Manhole for FW-A-25, FW-A-24, F
"Inspection of Backfilling Gravel 1st Layer (1 out of 2) around the Manhole for MH-A-01 - as Highlighte
Protection layer of 4mm thick bituminous protection board for Outer MCPE 3 wall axis 03-2, 03A to 02R
Steel Reinforcements for Strip Footing between PC 140-142-144 Zone 2H
"INSPECTION FOR INSTALLATION OF GULLIES G-G-37, G-G-40, G-G-42, G-G-44, G-G-45, G-G-47, G-G-48, G-
Shuttering for Strip Footing between PC 140-142-144 Zone 2H
Concreting for Strip Footing between PC 140-142-144 Zone 2H
Steel Reinforcements for BUTTRESS BII BIV 82, 83, 84, 85, 86 Zone 2F 2G
Shuttering and Shear Connectors for BUTTRESS BOV 60, 61 (2nd) Zone 2A
Concreting for BUTTRESS BOV 60, 61 (2nd) Zone 2A
Installation of straight UPVC Conduit (Dia.25mm) and Box for Security (CAM) at Buttress Axis (02/1W)
Installation of straight UPVC Conduit (Dia.25mm) and Box for Voice and Data (WIFI&CAM) at Buttress
Installation of straight UPVC Conduit (Dia.25mm) and Box for Fire Alarm (Speaker) at Buttress Axis (0
Installation of straight UPVC Conduit (Dia.32mm) for Power(Socket Outlet) at Crescent-02 (Buttress A
Installation of straight UPVC Conduit (Dia.32mm) for Power (Socket Outlet) at Crescent-02 (Buttress Ax
Excavation & Bed Preparation for Conduits (75mm) Laying for Normal Lighting Circuits Lines, running U
Marking & Check for coordinates of Tree Pits (5 no's), Inside Geyser Garden towards Aviary, at highli
Marking & Check for coordinates of Tree Pits (4 no's) at above Geyser Garden, along Boundary wall (22
Stack Boulders Installed 2 Place upto Level +876.60, (4th & 5th Line Between Planter Boxes) at Botto
Stack Boulders Installed 1 Place upto Level +876.20, (4th & 5th Line Between Planter Boxes) at Botto
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 6 layers) for 1 Curved Wall
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 3 layers) for Sub surface
Steel Reinforcement for Wall & Column of Boundary wall @ span 2 at Water Garden, as highlighted i
Installation of Rock and Boulder No. RB-157 - 1st layer (1 of 5)
Inspection of Casting (Plain) Concrete for the Duct Bank of MV Line between B/MV/12 to G/MV/08 at Zo
Inspection of Casting Reinforced Concrete for the Duct Bank of MV Line between B/MV/12 to G/MV/08
Inspection of Formwork for the Duct Bank of MV Line from B/MV/12 to near G/MV/08 at Zone-B (As Hig
Inspection of Steel Reinforcement for the Duct Bank of MV Line between B/MV/12 to G/MV/08 at Zone-
"Inspection for Casting the Blinding Concrete under the Manhole for FW-A-3-7, FW-A-3-8, FW-A-3-9 (as
Inspection for Rough Grading (Backfilling) upto (-40cm) from the Final Grading Level at Zone -G, for the
Inspection of Casting Reinforced Concrete for the Duct Bank of MV Line from B/MV/09 to B/MV/12 at Z
Inspection of Formwork for the Duct Bank of MV Line from B/MV/09 to B/MV/12 at Zone-B (As Highligh
Inspection of Steel Reinforcement for the Duct Bank of MV Line from B/MV/09 to B/MV/12 at Zone-B (A
Inspection and Compaction Test for 6th Layer (6 of 6) Backfilling for the existing trench from stage 2 e
Soil Preparation under Boulder No. RB- 269
"Inspection and Compaction Test for 2nd Layer (2 of 9) Backfilling around SBC-06 (Stock Pile # 129 A-1-B
"Inspection and Compaction Test for 1st Layer (1 of 9) Backfilling around SBC-06 (Stock Pile # 129 A-1-B
Soil Preparation prior to start Cutting and Backfill (-40cm from FGL) at Zone - F (Near RB-244) as highlig
Excavation for Telecommunication Line between G/TL/27 to K/TL/06) including pit G/TL/27, G/TL/39, G/
Excavation for Fire & Security Distribution Line from G/FS/26 to K/FS/12, including Pit G/FS/26, G/FS/
Surface Preparation Prior to start Backfilling at PC and STRIP FOOTING between PC 22-24-26 Zone 1D (as
Surface Preparation Prior to start Backfilling at SIDE of PC and STRIP FOOTING between PC 193-195 Zone
Level and Location for BUTTRESS BOV 85, 86 Zone 2G 2F
Level and Location for Blinding at Soak Away for South Admin Bldg. Zone 2C
Level and Location for MCPE 2 WALL (OUTER ) at axis 03K to 02AC Zone 2J (as highlighted)
Level and Location for Infill Wall Between BI 126-127 (Inner) as highlighted Zone 2R
Shuttering & Shear Connector for Infill Wall Between BI 126-127 (Inner) as highlighted Zone 2R
Shuttering and Shear Connector for BUTTRESS BOV 85, 86 Zone 2G 2F
Shuttering for MCPE 2 WALL (OUTER ) at axis 03K to 02AC Zone 2J (as highlighted)
Concreting for MCPE 2 WALL (OUTER ) at axis 03K to 02AC Zone 2J (as highlighted)
Concreting for BUTTRESS BOV 85, 86 Zone 2G 2F
Concreting for Infill Wall Between BI 126-127 (Inner) as highlighted Zone 2R
Excavation & Bed Preparation for Sub surface Pipes (2 no's of 110mm) Connecting to Gully Inside Boat
Marking & Check for coordinates of Tree Pits (10 no's) at Left side of Water Play Garden, at highlight
Inspection & Compaction tests of 4th Layer Backfilling (Sub-Grade) (Out of 7 layers) along the Boun
Stack Boulders Installed Layer upto Level +877.60 (Part 3), at 4th to 7th Line of Boulders, at Bottom
Inspection & Compaction tests of 5th Layer Backfilling (Sub-Grade) (Out of 8 layers) along the Wall (Ou
Inspection & Compaction tests of 4th Layer Backfilling (Sub-Grade) (Out of 8 layers) along the Wall (Ou
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 7 layers) along the Walls
Concrete Pouring & shuttering for Temporary Prop Foundation for Steel Structure Erection, at Plinth 3
Steel Reinforcement for Temporary Prop Foundation for Steel Structure Erection, at Plinth 3, Inside A
Stone Cladding for wall (All Sides), At 1 Straight Wall (Right Side), at Entrance, at Maze garden, as hi
Stone Coping on Boundary wall (after Stone Cladding for walls) @ Span 23, 24, 25 & 26 of Water Gard
Stack Boulders Installed 5th layer (upto Level +878.00) at Top, Left & Right Side of Mist Garden (Part
Stack Boulders Installed 5th layer upto Level +876.60, (3rd & 4th Line Between Planter Boxes) at Bot
Stack Boulders Installed 1st layer at Step 5, (upto level 876.75), Left side of Geyser Garden, at Wate
Stack Boulders Installed 7th layer upto Level +878.00, for 3rd & 4th Lines at Left Side of Planted Bed
Stack Boulders Installed 6th layer upto Level +877.60, for 3rd & 4th Lines at Left Side of Planted Bed
Stack Boulders Installed 4 layers at Levels (+875.70, +876.20, +876.60 & +877.10), (Small remaining ar
Stack Boulders Installed 2 places at Level +878.50 between Water play Garden and Boundary wall (Sp
Stack Boulders Installed 4 layers at Levels (+876.60, +877.10, +877.60 & +878.00) small area betwee
Stack Boulders Installed 5th Layer at level +877.48, Between Boat Garden and Boundary wall span (9 t
Stack Boulders Installed 2nd layer (At level +875.45) at Top Left Side of Geyser Garden and Between
Stack Boulders Installed 5th layers (At level +877.050) at Right Side Between Mist Garden & Geyser G
Installation of straight UPVC Conduit (Dia.25mm) and Box for Fire Alarm (Speaker) at Buttress Axis (02
Installation of straight UPVC Conduit (Dia.25mm) and Box for Fire Alarm (Flashing Beacon,Fire Telep
Installation of straight UPVC Conduit (Dia.25mm) and Box for Security (Card Reader,Door Relase & Em
Installation of straight UPVC Conduit (Dia.25mm) and Box for Voice and Data (Door Controller) at Ma
'300 mm Gravel 3/8" Bedding and Geotextile for Strom Water Line OUTFAL G for (450mmØ-UPVC Pipe
Pipe Installation for Storm Water Line OUTFALL-G for (450mmØ-UPVC Pipes class 4) from ( MH-G-03
'Fire Fighting Networks sand cover & pipes protection (30 cm above pipes). As per highlighted Area i
Level and Location for Mass Concrete of Strip Footing Between PC 14-16-18-20 Zone 1C
Level and Location for RING BEAM (Inner) Axis 02-1, 02AW to 02AZ Zone 2Q
Surface Preparation Prior to start Backfilling at LARGE MOSQUE (as Highlighted) Zone 1G
Inspection and compaction test 1st layer for backfilling around PC 27, 29 Zone 1E (as highlighted) (1 of
Inspection and compaction test 1st layer for backfilling Beside Strip Footing and PC 22-24-26 Zone 1D (a
Installation and Survey Report for Location and Levels of Anchor Bolts for RING BEAM (Inner) Axis 02-
Protection layer of 4mm thick Bituminous protection Board for PILECAP 27 Zone 1E (as Highlighted)
Surface Preparation and Solvent Base Primer for MCPE 2 outer Wall Axis 03-2, 02AH to 03L (as Highligh
Concreting of Foundation for Elevator Pit at North Restaurant Zone 1N 1P (as highlighted)
Concreting for BUTTRESS BOV 84 Zone 2G
Anti Termite application under Mass Concrete of Strip Footing Between PC 14-16-18-20 Zone 1C
Shuttering for Mass Concrete of Strip Footing Between PC 14-16-18-20 Zone 1C
Concreting for Mass Concrete of Strip Footing Between PC 14-16-18-20 Zone 1C
Surface Preparation and Solvent Base Primer for PILECAP 27 Zone 1E (as Highlighted)
"Soil Preperation Prior to Start Backfill Gravel around Manhole - MH-A-01 - as Highlighted"
Inspection for application of Damp Proofing (1st Coat & 2nd Coat) on top of Primer for External Wall an
Single layer of 4mm thick modified bituminous waterproofing membrane for PILECAP 27 Zone 1E (as Hig
Inspection for application of Primer (1 Coat) on External Wall and Top Slab of SBC-06 (As Highlighted)
Inspection of Steel Reinforcement for Canopy Foundation and Column Neck of Seating Area (1) Zone-K &
Inspection And Compaction Test For Backfilling Subgrade 3rd Layer (3 of 6) For Foul Water Line From
Excavation for Potable Water Line Pit B/PW/11 at Zone-B - as highlighted
"Surface Preparation Prior to Start Backfill Gravel for Manhole from FW-A-25, FW-A-24, FW-A-23, FW-
"Inspection for Backfilling Subbase behind the 2nd lift of Rock for Boulder no. RB-157 (under 2nd layer
Steel Reinforcements for RING BEAM (Inner) Axis 02-1, 02AW to 02AZ Zone 2Q
Inspection for Backfilling Subgrade behind the 2nd lift of Rock for Boulder no. RB-157 (under 2nd layer o
Surface Preperation prior to start backfilling gravel around the Duct Bank of MV Line from B/MV/19 to
"INSPECTION FOR INSTALLATION OF GULLIES G-F-01, G-F-02, G-F-03, G-F-04, G-F-05, G-F-06, G-F-07, G-F
Shuttering for RING BEAM (Inner) Axis 02-1, 02AW to 02AZ Zone 2Q
Installation of straight UPVC Conduit (4x110mm) forTELECOM Duct Bank (DB no.FG/D-TL/01 Manhole
Installation of straight UPVC Conduit (2x110mm) for Fire and Security Duct Bank (DB no.GG/D-FS/0
Installation of straight UPVC Conduit (4x110mm) for TELECOM Duct Bank (Manhole no. G/TL/29 to H/TL/
Installation of straight UPVC Conduit (2x110mm) for Fire and Security Duct Bank (DB no.GH/D-FS/01 M
Installation of straight UPVC Conduit (4x110mm) for TELECOM Duct Bank (DB no.BG/D-TL/02 Manhole no
Installation of straight UPVC Conduit (2x110mm) for Fire and Security Duct Bank (DB no.BG/D-FS/02
Installation of straight UPVC Conduit (3X25mm) and Box for Fire Alarm (Receiver Beam Detector,Speak
Installation of straight UPVC Conduit (Dia.25mm 2pcs. & Box-2pcs.) for Security (CCTV and Card Read
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 4 layers and single layer
Inspection & Compaction tests of Single Layer (Sub-Base) Backfilling (from level +873.55 to +874.30)
Installation and Fixation of Anchor Bolts and Check Coordinates & Levels for Ring Beam @ Grid (1-12/
Coordinates & Levels of Ring Beam & Remaining part of Wall @ Grid (1-12/Right Side), on Boundary wa
Concrete Pouring & shuttering for Ring Beam & Remaining part of Wall @ Grid (1-12/Right Side), on B
Gravel 3/8 Bedding & Geotextile Surround for Sub surface Drainage lines (Sub lines 110mm & Sleev
Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Grade) (Out of 8 layers) along the Wall (Ou
Stack Boulders Installed 1st layer at Step 2, (upto level 875.55), Left side of Geyser Garden, at Wate
Soil preparation Prior to Backfilling (From Bottom of Blinding Level +875.02) along 1 Curved Wall (All
"Inspection of Grouting (Horizontal Joints) for Rock Boulder - RB-240 for All Layers"
"Inspection of Grouting (Vertical Joints) for Rock Boulder - RB-240 for All Layers"
"Inspection of Grouting (Horizontal Joints) for Rock Boulder - RB-170a for All Layers"
"Inspection of Grouting (Vertical Joints) for Rock Boulder - RB-170a for All Layers"
"Inspection of Grouting (Horizontal Joints) for Rock Boulder - RB-252 for All Layers"
"Inspection of Grouting (Vertical Joints) for Rock Boulder - RB-252 for All Layers"
"Inspection of Grouting (Horizontal Joints) for Rock Boulder - RB-158 for All Layers"
"Inspection of Grouting (Vertical Joints) for Rock Boulder - RB-158 for All Layers"
Installation of Rock and Boulder No. RB-255 - 3rd Layer (3 of 4)
"Inspection of Grouting (Vertical Joints) for Rock Boulder - RB-337 for All Layers"
Excavation for Storm Water Line from MH-M-09 to MH-M-04 including Manhole MH-M-09, MH-M-08,
"Excavation for Foul Water Line from FW-A-09 to FW-A-06 including Manhole FW-A-09, FW-A-08, FW-A-07
Soil Preparation prior to start backfill around SBC-06 - as highlighted
Surface Preparation prior to start Waterproofing for SBC-06 - as highlighted
Inspection and Compaction Test for 5th Layer (5 of 6) Backfilling for the existing trench from stage 2 e
Excavation for MV Line from F/MV/01 TO B/MV/11 including Pit - F/MV/01, F/MV/09, F/MV/06, F/MV/0
Inspection of Casting Reinforced Concrete for the Duct Bank of MV Line from B/MV/09 to B/MV/21 at Z
Inspection of Formwork for the Duct Bank of MV Line from B/MV/09 to B/MV/21 at Zone-B (As Highligh
Inspection of Steel Reinforcement for the Duct Bank of MV Line from B/MV/09 to B/MV/21 at Zone-B (A
Inspection of Sand Bedding under pipe for Telecommunication Line between K/TL/09 to K/TL/15 at Zone
Inspection of Sand Bedding under pipe for Fire & Security Distribution Line between K/FS/23 to K/FS/09
Inspection for Rough Grading (Cut & Fill) upto (-40cm) from the Final Grading Level at Zone - K&L (Near
Inspection And Compaction Test For Backfilling Subgrade 2nd Layer (2 of 6) For Foul Water Line From
Inspection And Compaction Test For Backfilling 5th Layer (5 of 14) For Foul Water Line From FW-A-3-6.
Inspection And Compaction Test For Backfilling 9th Layer (9 of 14) For Foul Water Line From FW-A-3-6.
Inspection of Backfilling Sub Grade Above Gravel (4th Layer out of 8) around the Manhole for FW-A-3-6
Inspection of Backfilling Sub Grade Above Gravel (5th Layer Out of 5) Around The Manhole for FW-A-3-
Steel Reinforcements & shear Connectors for RING BEAM (Inner) Axis 02-1, 02AP to 02AT Zone 2N
Inspection of Backfilling Sub Grade Above Gravel (6th Layer out of 8) around the Manhole for FW-A-3-6
Inspection And Compaction Test For Backfilling 5th Layer (5 of 9) For Storm Water Line From MH-K-07
Inspection And Compaction Test For Backfilling 5th Layer (5 of 9) For Foul Water Line From FW-A-3-7 T
Level and Location for RING BEAM (Inner) Axis 02-1, 02AP to 02AT Zone 2N
Level and Location for MCPE 2 Foundation (connecting tunnel) Axis 03I1 to 02AA Zone 2G 2H (as highlig
Level and Location for BUTTRESS BII 53 (1ST W/BEAM) Zone 1N
Level and Location for BUTTRESS BOI 88, 89, 90, 91, 92 (with Beam) Zone 2H 2G
Installation and Survey Report for Location and Levels of Anchor Bolts for RING BEAM (Inner) Axis 02-1
Surface Preparation Prior to start Backfilling at SIDE of PC and STRIP FOOTING between PC 22-24-26 Zon
Pipe Installation of Sub-Surface Drainage (Main Line & Branches) Pipes; (110mmØ, UPVC-CLASS-4)
''Warning Tape Installation for Fire Fighting Networks for (250mmØ-UPVC-Class-5). As per highlighte
Shuttering for RING BEAM (Inner) Axis 02-1, 02AP to 02AT Zone 2N
'Pipe Installation for Storm Water Line OUTFALL-G for ((315mmØ-UPVC Pipes class 4) from ( Catch Basin
Concreting for RING BEAM (Inner) Axis 02-1, 02AP to 02AT Zone 2N
'300 mm Gravel 3/8" Backfilling and Geotextile for Strom Water Line OUTFAL G for (315mmØ-UPVC Pipes
Steel Reinforcements for MCPE 2 Foundation (connecting tunnel) Axis 03I1 to 02AA Zone 2G 2H (as high
Shuttering for MCPE 2 Foundation (connecting tunnel) Axis 03I1 to 02AA Zone 2G 2H (as highlighted)
Concreting for MCPE 2 Foundation (connecting tunnel) Axis 03I1 to 02AA Zone 2G 2H (as highlighted)
Concreting for BUTTRESS BIV 93, 94, 96 Zone 2H 2J
Shuttering and Shear Connector for BUTTRESS BII 53 (1ST W/BEAM) Zone 1N
Concreting for BUTTRESS BII 53 (1ST W/BEAM) Zone 1N
Steel Reinforcements for BUTTRESS BOI BOV 82, 83 Zone 2F
Shuttering & shear Connector for BUTTRESS BOI 88, 89, 90, 91, 92 (with Beam) Zone 2H 2G
Concreting for BUTTRESS BOI 88, 89, 90, 91, 92 (with Beam) Zone 2H 2G
Surface Preparation and Solvent Base Primer under TUNNEL 1 Foundation Zone 1C (as Highlighted)
Surface Preparation and Solvent Base Primer under Strip footing between PC 20, 22, 24, 26 Zone 1D (as
Single layer of 4mm thick modified bituminous waterproofing under Strip footing between PC 20, 22, 24
Installation of Rock and Boulder No. RB-158 - 4th Layer (4 of 4)
Installation of Rock and Boulder No. RB-158 - 3rd Layer (3 of 4)
Installation of Rock and Boulder No. RB-158 - 2nd Layer (2 of 4)
Installation of Rock and Boulder No. RB-252 - 4th Layer (4 of 4)
"Inspection of Grouting (Vertical Joints) for Rock Boulder - RB-109 for All Layers"
"Inspection of Grouting (Vertical Joints) for Rock Boulder - RB-319 for All Layers"
"Inspection of Grouting (Horizontal Joints) for Rock Boulder - RB-319 for All Layers"
"Inspection of Grouting (Vertical Joints) for Rock Boulder - RB-277 for All Layers"
"Inspection of Grouting (Horizontal Joints) for Rock Boulder - RB-277 for All Layers"
"Inspection of Grouting (Horizontal Joints) for Rock Boulder - RB-071 for All Layers"
"Inspection of Grouting (Horizontal Joints) for Rock Boulder - RB-262 for All Layers"
Installation of Rock and Boulder No. RB-158 - 1st layer (1 of 4)
Installation of Rock and Boulder No. RB-252 - 3rd layer (3 of 4)
Installation of Rock and Boulder No. RB-255 - 2nd Layer (2 of 4)
"INSPECTION FOR INSTALLATION OF GULLIES G-G-54, G-G-55, G-G-56, G-G-57, G-G-58, G-G-59, G-G-60, G
"Inspection of Backfilling Gravel 1st Layer (1 out of 2) around the Manhole for MH-E-01, MH-E-02, MH
Inspection of Backfilling Sub-grade Above Gravel 1st Layer (1 out of 5) around the Manhole for MH-K
"Inspection of Backfilling Sub-grade above gravel 1st Layer (1 out of 5) around the Manhole for FW-
"Inspection of Backfilling Gravel 2nd Layer (2 out of 5) around the Manhole for FW-A-3-11, FW-A-3-13
Inspection of Backfilling Sub Grade Above Gravel (4th Layer Out of 5) Around The Manhole for FW-A-3-
Inspection of Backfilling Sub Grade Above Gravel (3rd Layer out of 8) around the Manhole for FW-A-3-6
Inspection of Backfilling Sub Grade Above Gravel (5th Layer out of 8) around the Manhole for FW-A-3-6
Inspection And Compaction Test For Backfilling 4th Layer (4 of 14) For Foul Water Line From FW-A-3-6.
Inspection And Compaction Test For Backfilling 8th Layer (8 of 14) For Foul Water Line From FW-A-3-6.
Excavation for Potable Water Line at Zone-F including Pit - F/PW/04 - as highlighted
Inspection for Blinding Concrete under Potable Water Line Pit B/PW/04, B/PW/06, B/PW/07, B/PW/08,
Excavation for Potable Water Line Pit B/PW/04 at Zone-B - as highlighted
Inspection for application of Protection Board on top of Damp Proofing for External wall and Top Slab o
Excavation for Potable Water Line at Zone-F - as highlighted
Inspection for Backfilling Sub-base under Boulder no. RB-157 (SP # 110 A-1-A)
Inspection and Compaction Test for 4th Layer (4 of 6) Backfilling for the existing trench from stage 2 e
Stack Boulders Installed 1st layer (At level +875.25) at Top Left Side of Geyser Garden, at the way t
Inspection & Compaction tests of 6th Layer Backfilling (Sub-Grade) (from level +875.20) for Sub surf
Sand Cover & Protection of HDPE Pipe Installation of water features pipes, (160mmØ CLASS-PE100), In
4th Layer Gravel Backfilling Surround the Manholes (1 no's) (MH-D-09) (Type C-1 no's) Inside Discover
Concrete Pouring & shuttering for Temporary Prop Foundation for Steel Structure Erection, at Plinth 7,
Steel Reinforcement for Temporary Prop Foundation for Steel Structure Erection, at Plinth 7, 8, 12 & 1
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 7 layers) along the Walls
Coordinates & Levels for Kicker (2nd Lift) of Boundary wall @ span 2 at Water Garden, as per Highlig
Concrete Pouring & Shuttering for Kicker (2nd Lift) of Boundary wall @ span 2 at Water Garden, as pe
Inspection and compaction test 4th layer for backfilling of PC and Strip Footing Between PC 31 to 43 Zon
Surface Preparation Prior to start Backfilling at Soak Away of North Admin Building (as Highlighted) Zon
Level and Location for MCPE 2 WALL (OUTER ) at axis 02AD to 03K Zone 2J (as highlighted)
Level and Location for BUTTRESS BOV 84, 85, 86, 87 Zone 2G 2F
Level and Location for BUTTRESS BIV BOV 52 (2nd) Zone 1N
Level and Location for BUTTRESS BOI 62, 63 (1st with beam) Zone 2A 2B
Installation and Survey Report for Location and Levels of Anchor Bolts for CANOPY @ BII 53 Zone 1N out
Concreting for MCPE 2 WALL (OUTER ) at axis 02AD to 03K Zone 2J (as highlighted)
Shuttering and Shear Connector for BUTTRESS BOV 84, 85, 86, 87 Zone 2G 2F
Concreting for BUTTRESS BOV 87 Zone 2G 2F
Steel Reinforcements for BUTTRESS BII BIV 87, 88, 89, 90 Zone 2G 2H
Shuttering for MCPE 2 WALL (OUTER ) at axis 02AD to 03K Zone 2J (as highlighted)
Shuttering and Shear Connector for BUTTRESS BIV BOV 52 (2nd) Zone 1N
Concreting for BUTTRESS BIV BOV 52 (2nd) Zone 1N
Steel Reinforcements for Infill Wall Between BI 127-128 (Inner) as highlighted Zone 2R
Concreting for BUTTRESS BOI 62, 63 (1st with beam) Zone 2A 2B
Steel Reinforcement Implant using Approved Material (KAIG3-MAT-GN-S-0099-00) for BOI 83 Zone 2F (a
Steel Reinforcements For MCPE 2 outer Wall Axis 03-G - 02-Y, 02-2 (as Highlighted) Zone 2G 2H
Steel Reinforcements For MCPE 1 Inner (w/out counter fort) Wall Axis 03-T - 03-S, 03-2 (as Highlighte
Shuttering and Shear Connector for BUTTRESS BOI 62, 63 (1st with beam) Zone 2A 2B
Pipe Installation of Fire Fighting Networks for (250mmØ-UPVC-Class-5). As per highlighted Area in t
Excavation & Bed Preparation for Conduits (160mm) Laying for Low Voltage Sub Main Containment Lin
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 8 layers) along the Wall (O
Inspection & Compaction tests of 4th Layer Backfilling (Sub-Grade) (Out of 8 layers) along the Wall (Ou
Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Grade) (Out of 7 layers) along the Boun
Inspection & Compaction Tests of Single Layer Sub Garde Backfilling (Start from Bottom of Blinding)
Stack Boulders Installed 5th layer upto Level +877.10, for 2nd & 3rd Lines at Left Side of Planted Bed
Protection Layer 4mm thk Bituminous Protection Board on Waterproofing of footing & Kicker of 1 Curved
Concrete Pouring & Shuttering for Wall & Buttress of Boundary wall @ Grid (11-16/Right Side), Behind
Concrete Pouring & Shuttering for Footing of Boundary wall @ span 2 at Water Garden, as per Highli
"Inspection of Grouting (Horizontal Joints) for Rock Boulder - RB-301 for All Layers"
"Inspection of Grouting (Horizontal Joints) for Rock Boulder - RB-300 for All Layers"
Installation of Rock and Boulder No. RB-252 - 2nd layer (2 of 4)
Installation of Rock and Boulder No. RB-240 - 4th layer (4 of 4)
Installation of Rock and Boulder No. RB-240 - 3rd layer (3 of 4)
Installation of Rock and Boulder No. RB-252 - 1st layer (1 of 4)
"Inspection of Grouting (Horizontal Joints) for Rock Boulder - RB-239 for All Layers"
"Inspection of Grouting (Vertical Joints) for Rock Boulder - RB-239 for All Layers"
Inspection and Compaction Test for 3rd Layer (3 of 3) backfilling (grading) at Zone - K&L (Near Crusher)
Inspection and Compaction Test for 3rd Layer (3 of 6) Backfilling for the existing trench from stage 2 e
Inspection and Compaction Test for 4th Layer (4 of 4) Backfilling under Boulder No. RB-157 (Stock Pile #
INSPECTION FOR INSTALLATION OF SLABS FOR (FW8) - As Highlighted
INSPECTION FOR INSTALLATION OF SLABS FOR (FW6-2, FW6-3) - As Highlighted
Inspection And Compaction Test For Backfilling Subgrade 1st Layer (1 of 6) For Foul Water Line From F
'Warning Tape Installation for Foul Water Line for (250mmØ-UPVC Pipes class 4) from ( FW-A-13 to F
300 mm Gravel 3/8" Backfilling and Geotextile for Foul Water Line for (250mmØ-UPVC Pipes class 4)
Steel Reinforcements of Foundation for Elevator Pit at North Restaurant Zone 1N 1P (as highlighted)
Shuttering of Foundation for Elevator Pit at North Restaurant Zone 1N 1P (as highlighted)
Two layers of 3mm thick modified bituminous water proofing for Outer MCPE 3 wall axis 03-2, 03A to 02
Surface Preparation and Solvent Base For MCPE 1 WALL Zone 2N 2M (as Highlighted)
Shuttering for TUNNEL 2 WALL at axis 01-2 Zone 2F (as highlighted)
Concreting for TUNNEL 2 WALL at axis 01-2 Zone 2F (as highlighted)
ERECTION OF MOCK-UP FOR ETFE SYSTEM
Level and Location for Foundation for Elevator Pit at North Restaurant Zone 1N 1P (as highlighted)
Level and Location for TUNNEL 2 WALL (2ND) at axis 01-2 Zone 2F (as highlighted)
Inspection and compaction test 6th layer for backfilling of PC and Strip Footing Between PC 142 - 144 Z
Installation of straight UPVC Conduit (4x110mm) for TELECOM Duct Bank (DB no.GG/D-TL/59 Manhol
Installation of straight UPVC Conduit (2x110mm) for Fire and Security Duct Bank (DB no.GG/D-FS/
Installation of straight UPVC ducts (4x160mm) Medium Voltage Duct bank no. BB/D-MV/05 from Manho
Installation of straight UPVC conduit (Dia. 25mm) and Box for Voice and Data (WIFI) at the Crescent-02
Surface Preparation prior to Backfilling along the Walls (Outer Side) of Whispering Cave 1 & 2, (Fro
Aluminium Flashing & Sealant for Waterproofing on Foundation of walls (Outer Side) of Whispering C
Inspection & Compaction tests of Single (Final) Layer Backfilling (Sub-Base) (after 2 layers of Sub G
Inspection & Compaction tests of 5th Layer Backfilling (Sub-Grade) (from level +875.20) for Sub surf
Inspection & Compaction tests of 5th (Final) Layer Backfilling (Sub-Base) (Out of 5 layers) Behind th
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 2 layers and single layer
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 2 layers and single layer
Installation of Rock and Boulder No. RB-240 - 2nd layer (2 of 4)
Installation of Rock and Boulder No. RB-170a - 4th layer (4 of 4)
Installation of Rock and Boulder No. RB-170a - 3rd layer (3 of 4)
Inspection for casting concrete for short piece and Surface Preperation prior to start waterproofing fo
"Inspection for casting concrete for short piece and Surface Preperation prior to start waterproofi
Inspection And Compaction Test For Backfilling 4th Layer (4 of 9) For Storm Water Line From MH-K-07
Inspection And Compaction Test For Backfilling 4th Layer (4 of 9) For Foul Water Line From FW-A-3-7 T
Inspection of Casting Reinforced Concrete for the Duct Bank of MV Line from B/MV/26 to B/MV/18 at Z
Inspection of Formwork for the Duct Bank of MV Line from B/MV/26 to B/MV/18 at Zone-B (As Highligh
Inspection of Steel Reinforcement for the Duct Bank of MV Line from B/MV/26 to B/MV/18 at Zone-B (A
Inspection for application of Damp Proofing (1st Coat & 2nd Coat) on top of Primer for External Wall an
Inspection and Compaction Test for 3rd Layer (3 of 4) Backfilling under Boulder No. RB-157 (Stock Pile #
Excavation for MV Line from B/MV/06 TO B/MV/12 at Zone-B as highlighted in the attached drawing
Excavation (as per instruction of DAR) for the loose Exsisting NGL in at PC 22, 24 at Zone 1D (as highligh
Inspection and compaction test 5th layer for backfilling of PC and Strip Footing Between PC 142 - 144 Z
Concreting for BUTTRESS BIV 20 21 Zone 1E 1F
Concreting for Strip Footing between PC 84-86-88-90 Zone 1P
Shuttering for Strip Footing between PC 84-86-88-90 Zone 1P
Steel Reinforcements for Strip Footing between PC 84-86-88-90 Zone 1P
Level and Location for Strip Footing between PC 84-86-88-90 Zone 1P
Level and Location for BUTTRESS BII 02 (with beam) Zone 1A
Installation of straight UPVC conduit (Dia. 25mm) and Box for Fire Alarm (Speaker,Receiver Beam Dete
Installation of straight UPVC conduit (Dia. 25mm) and Box for Security (CAM) at the Crescent-02 (Axis
Installation of straight UPVC conduit (Dia. 25mm) and Box for Voice and Data (WIFI & CAM) at the Cres
Installation of straight UPVC conduit (Dia. 25mm) and Box for Fire Alarm (Speaker) at the Crescent-02
Installation of straight UPVC conduit (Dia. 3inch.) for Low Current (TELECOM) at Discovery Garden as
Installation of straight UPVC conduit (Dia. 3inch.) for Low Current (Fire and Security) at Discovery Gar
HDPE Pipe Installation of water features pipes; (160mmØ CLASS-PE100); As per High lighted Attach
Installation of Rock and Boulder No. RB-240 - 1st layer (1 of 4)
Installation of Rock and Boulder No. RB-319 - 4th Layer (4 of 4)
Installation of Rock and Boulder No. RB-319 - 3rd Layer (3 of 4)
Installation of Rock and Boulder No. RB-170a - 2nd layer (2 of 4)
Excavation for Car Park Tree Pit as Details D-38-1, as highlighted in the attached drawing
"Inspection and Compaction Test for NGL of Telecommunication Line at Zone - B (As Highlighted)"
"Inspection and Compaction Test for NGL of Fire & Security Line at Zone - B (As Highlighted)"
Inspection for Backfilling Sub-base under Boulder no. RB-158 (Stock Pile # 110 A-1-A)
Soil Preparation under Boulder No. RB- 158
Excavation for Telecommunication Line between K/TL/09 to K/TL/15) including pit K/TL/10 at Zone-K as
Excavation for Fire & Security Distribution Line between K/FS/23 to K/FS/09) including Pit K/FS/09 at Z
Soil Preparation prior to start Cutting and Backfill (-40cm from FGL) at Zone - K&L (Near RB-300) as high
Inspection for application of Primer (1 Coat) on External Wall and Top Slab of SBC-06 (As Highlighted)
Surface Preparation Prior to Start Backfill Sub grade for Foul line between FW-A-3-6 TO FW-A-3-7 - AS H
Surface Preparation prior to start Waterproofing for Blinding Concrete under Canopy Foundation of Sea
Inspection and Compaction Test for 2nd Layer (2 of 6) Backfilling for the existing trench from stage 2 e
Inspection and Compaction Test for 2nd Layer (2 of 4) Backfilling under Boulder No. RB-157 (Stock Pile #
Inspection and Compaction Test for 1st Layer (1 of 4) Backfilling under Boulder No. RB-157 (Stock Pile #
Inspection of Casting Reinforced Concrete for the Duct Bank of MV Line from G/MV/07 to G/MV/06 at Z
Inspection of Formwork for the Duct Bank of MV Line from G/MV/07 to G/MV/06 at Zone-G (As Highligh
Inspection of Steel Reinforcement for the Duct Bank of MV Line from G/MV/07 to G/MV/06 at Zone-G (A
INSPECTION FOR INSTALLATION OF ALL RINGS (RISER) FOR MH-G-01, MH-G-02, MH-G-03, MH-G-03-1, M
"Inspection For Manhole Base Installation And UPVC Pipe Connection For MH-G-03-1, MH-G-03-2, MH-G-
Inspection for Rough Grading (backfilling) upto (-40cm) from the Final Grading Level at Zone-K (Near To
Inspection And Compaction Test For Backfilling 3rd Layer (3 of 14) For Foul Water Line From FW-A-3-6.
Inspection and compaction test 4th layer for backfilling of MCPE 4 Zone 1N (as highlighted) (4 of 6 laye
Inspection and compaction test 3rd layer for backfilling of PC and Strip Footing Between PC 31 to 43 Zon
Inspection and compaction test 4th layer for backfilling of PC and Strip Footing Between PC 142 - 144 Z
Level and Location PRIOR to Excavation of (Loose Materials as per DAR Engineer) for Strip footing and
Level and Location for BUTTRESS BIV 60, 61 (2ND) Zone 2A
Level and Location for BUTTRESS BII 62, 63 (1ST with Beam) Zone 2A 2B
Level and Location for BUTTRESS BIV 93, 94, 95, 96 Zone 2H 2J
Concreting for BUTTRESS BOV 92 Zone 2H
Concreting for BUTTRESS BIV 60, 61 (2ND) Zone 2A
Shuttering and Shear Connector for BUTTRESS BIV 60, 61 (2ND) Zone 2A
Concreting for BUTTRESS BII 62, 63 (1ST with Beam) Zone 2A 2B
Shutterig and Shear Connector for BUTTRESS BII 62, 63 (1ST with Beam) Zone 2A 2B
Shuttering for BUTTRESS BIV 93, 94, 95, 96 Zone 2H 2J
Inspection & Compaction Tests of Single (Final) Layer Sub Base Backfilling (Start from Bottom of Blin
Surface preparation prior to Backfillling along the Boundary Wall (Outer side) @ Grid (EXC3-01 to EXC
2nd Coat Damp proofing for footing & Kicker of 2 Curved Walls, (All Sides) at Entrance, at Maze garde
Steel Reinforcements for BUTTRESS BII BIV 95 (2nd) Zone 2J
Level and Location for MCPE 2 WALL (OUTER ) at axis 02AE to 03L Zone 2J (as highlighted)
Concreting for MCPE 2 WALL (OUTER ) at axis 02AE to 03L Zone 2J (as highlighted)
Shuttering for MCPE 2 WALL (OUTER ) at axis 02AE to 03L Zone 2J (as highlighted)
Stack Boulders Installed 4th Layer at level +877.08, Between Boat Garden and Boundary wall span (9 t
Stack Boulders Installed at level +876.68 (Remaining), Between Boat Garden and Boundary wall span (
Stack Boulders Installed 8th layer at Level +878.50, (Part 4) along Planted Bed 2 to 3 and above, Ins
Stack Boulders Installed 2 places at Level +878.00 (above Planted Bed 3), (Part 4) Inside Water Play
Stack Boulders Installed 2 places at Level +877.60 (above Planted Bed 3), (Part 4) Inside Water Play
Stack Boulders Installed 2 places at Level +877.10 (above Planted Bed 3), (Part 4) Inside Water Play
Stack Boulders Installed 2 places at Level +876.70 (above Planted Bed 3), (Part 4) Inside Water Play
Stack Boulders Installed 4th layers (At level +876.650) at Right Side Between Mist Garden & Geyser G
Stack Boulders Installed 4th layer upto Level +876.20, (3rd & 4th Line Between Planter Boxes) at Bot
Stack Boulders Installed 2 places at Level +876.20 (above Planted Bed 3), (Part 4) Inside Water Play
Excavation & Bed Preparation for Sub surface Drainage lines (Sub lines 110mm & Sleeves Connected
Installation of straight UPVC conduit (Dia. 25mm) and Box for Fire Alarm (Speaker) at the Crescent-0
Installation of straight UPVC conduit (2x110mm) for Fire and Security ( MH/SG/FA/7 to FA&SEC Han
Installation of straight UPVC conduit (2x110mm) for TELECOM (TELECOM Handhole to MH/SG/TC/9) a
Installation of straight UPVC ducts Small Power & Normal Lighting (3x75mm) (MH/SG/LV/07 to MH/S
Installation of straight UPVC ducts Emer. Lighting R6/FP4/E/4 (2x75mm) (MH/SG/EM/5 to MH/S
Installation of Rock and Boulder No. RB-277 - 4th Layer (4 of 4)
Installation of Rock and Boulder No. RB-277 - 3rd Layer (3 of 4)
"Inspection of Grouting (Horizontal Joints) for Rock Boulder - RB-283 for All Layers"
"Inspection of Grouting (Vertical Joints) for Rock Boulder - RB-283 for All Layers"
Installation of Rock and Boulder No. RB-277 - 2nd Layer (2 of 4)
Installation of Rock and Boulder No. RB-319 - 2nd Layer (2 of 4)
Installation of Rock and Boulder No. RB-170a 1st layer (1 of 4)
Installation of Rock and Boulder No. RB-283 - 4th layer (4 of 4)
Installation of Rock and Boulder No. RB-169b - 4th Layer (4 of 4)
Installation of Rock and Boulder No. RB-169b 3rd Layer) (3 of 4)
Inspection of Casting Blinding Concrete under Canopy Foundation of Seating Area (1) Zone-L (SA-15) - A
"Inspection of Water Proofing for Concrete Encasement of Storm Water Line Branch for Gully G-E-02, G-
Surface Preparation Prior to Start Backfilling Sub Grade For Main line F AS Highlighted
"Surface Preparation Prior to Start Backfilling Gravel For Manholes MH-F-01, MH-F-01-1, MH-F-01-2
"Surface Preparation Prior to Start Backfilling Gravel For GULLIES G-F-1, G-F-2, G-F-3, G-F-4, G-F-5, G
Inspection And Compaction Test For Backfilling 7th Layer (7 of 14) For Foul Water Line From FW-A-3-6.
Inspection of Casting Reinforced Concrete for the Duct Bank of MV Line from G/MV/29 to G/MV/07 at Z
Inspection of Formwork for the Duct Bank of MV Line from G/MV/29 to G/MV/07 at Zone-G (As Highligh
Inspection of Steel Reinforcement for the Duct Bank of MV Line from G/MV/29 to G/MV/07 at Zone-G (A
Inspection of Concrete (Plain) Pouring for the Duct Bank of Telecommunications Line between B/TL/421
Inspection of Concrete (Plain) Pouirng for the Duct Bank of Fire & Security Distribution Line between B
Inspection of formwork for Duct Bank of Fire & Security line from B/FS/21 to B/FS/36 at Zone-B - As Hig
Inspection of Steel Reinforcement for Duct Bank of Fire & Security line between B/FS/21 to B/FS/36 at
Inspection of Steel Reinforcement for Duct Bank of Telecommunications line between B/TL/42 to B/TL/3
Inspection of Water Proofing for the Duct Bank of MV Line from B/MV/06 to G/MV/13 at Zone-B (As Hig
Inspection of Water Proofing for the Duct Bank of MV Line from B/MV/07 to B/MV/10 at Zone-B (As Hig
Surface Preparation prior to start Water Proofing for Concrete Encasement of Storm Water Line Branch f
Stack Boulders Installed 3rd layer upto Level +875.80, (3rd & 4th Line Between Planter Boxes) at Bot
Stack Boulders Installed 2nd layer upto Level +875.40, (3rd & 4th Line Between Planter Boxes) at Bot
Stack Boulders Installed 4th layer upto Level +876.60, for 2nd & 3rd Lines at Left Side of Planted Bed
Stack Boulders Installed 1st layer upto Level +875.00, (3rd & 4th Line Between Planter Boxes) at Bot
Stack Boulders Installed 2nd layer (upto Level +877.50) at (3rd Line at 2 places) Left Side of Mist Gar
Stack Boulders Installed 1st layer (upto Level +877.05) at (3rd Line) Left Side of Mist Garden (Part 1),
Stack Boulders Installed 1st layer at Step 4, (upto level 876.35), Left side of Geyser Garden, at Wate
Stack Boulders Installed 1st, 2nd & 3rd layer upto Level +876.6 (Part 3), (Remaining between Planter
Plaster Guide Points & Accessories for Plastering of walls Inside Roof Access (Verticle Ladder), at G
Inspection of Spatter Dash (Rough Coat) Prior to Plastering of walls Inside Toilet & Entrance (GF-507
Slated Layer 4mm thk Modified Bituminous Waterproofing membrane for Foundation of walls (Outer Si
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 7 layers) along the Bounda
Inspection & Compaction tests of 6th Layer Backfilling (Sub-Grade) (Out of 8 layers) along the Bounda
Inspection & Compaction Tests of Single (Final) Layer Sub Base Backfilling (Start from Bottom of Blin
Stone Coping on Boundary wall (after Stone Cladding for walls) @ Span 27, 28, 29 & 30 of Water Gard
Stone Cladding for Walls (Outer Face) of Outer Canopy 2, at Outside of Physic Garden, at highlighted
Concrete Pouring & Shuttering for Columns (Upto height +876.51) & Walls (Upto height +876.66) at Gr
Stone Cladding for wall (Outer Sides & both end sides) of 1 Curved Wall, at Entrance (Left Side), at M
Stack Boulders Installed 5th layer (upto Level +881.50) at Left side of Water Play Garden, (Part 6) At
Installation and Survey Report for Location and Levels of Anchor Bolts for RING BEAM (outer) at Zone 2K
Level and Location for Strip Footing between PC 83-85-87-89 Zone 1P
Level and Location for RING BEAM (Outer) Axis 02-2, 02AH to 02AE Zone 2K
Inspection and compaction test 3rd layer for backfilling of PC and Strip Footing Between PC 142 - 144 Z
Inspection and compaction test 3rd layer for backfilling of MCPE 4 Zone 1N (as highlighted) (3 of 6 laye
Concreting for RING BEAM (Outer) Axis 02-2, 02AH to 02AE Zone 2K
Concreting for Ring Beam Zone 2Q Outer Axis 02-2, 02AW to 02AZ
Concreting for BUTTRESS BOV 88, 89, 90, 91 Zone 2G 2H
Pipe Installation for Storm Water Line OUTFALL-G for (Catch Basin G-E-07 315mmØ- UPVC PIPE CL.4) T
Steel Reinforcements for MCPE 1 WALL & counterfort (INNER) at axis 03R to 03S Zone 2M 2N (as highlig
Concreting for Strip Footing between PC 83-85-87-89 Zone 1P
Shuttering for Strip Footing between PC 83-85-87-89 Zone 1P
Steel Reinforcements for Strip Footing between PC 83-85-87-89 Zone 1P
Shuttering for RING BEAM (Outer) Axis 02-2, 02AH to 02AE Zone 2K
Steel Reinforcements for RING BEAM (Outer) Axis 02-2, 02AH to 02AE Zone 2K
Pipe Installation of Fire Fighting Networks for (160mmØ-UPVC-Class-5), Including Thrust Blocks. As p
Installation of Rock and Boulder No. RB-319 1st layer (1 of 4)
Installation of Rock and Boulder No. RB-277 1st layer (1 of 4)
Installation of Rock and Boulder No. RB-239 - 4th layer (4 of 4)
Inspection And Compaction Test For Backfilling 6th Layer (6 of 14) For Foul Water Line From FW-A-3-6.
Inspection and Compaction Test for 3rd Layer (3 of 3) backfilling (grading) at Zone - K (Near Tower-3) a
"Casting Blinding Concret under Manhole MH-G-03-01, MH-G-03-02, MH-G-04, MH-G-05, MH-G-04 and G
Inspection of Formwork for Duct Bank of Telecommunications line from B/TL/42 to B/TL/36 at Zone-B -
Soil Preparation under Boulder No. RB- 157
"Surface Preparation Prior to Start Backfilling Gravel For Manhole MH-E-01, MH-E-02, MH-E-04 - AS Hig
"INSPECTION FOR INSTALLATION OF ALL RINGS (RISER) AND SLAB FOR MH-G-01-1, MH-G-01-2, MH-G-01
"Inspection For Manhole Base Installation And UPVC Pipe Connection For MH-G-01, MH-G-01-1, MH-
Installation of straight UPVC conduit (25mm) and Box for Fire Alarm at the Maze Garden Zone 5A per at
Inspection For Installation Of Slabs For (FW-A-13-4) (As Highlighted).
Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Grade) (from level +875.20) for Sub surf
Plaster Guide Points & Accessories for Plastering of walls Inside Toilet & Entrance (GF-5071 & 5070),
Inspection & Compaction tests of 4th Layer Backfilling (Sub-Base) (Out of 5 layers) Behind the Boulde
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 8 layers) along the Wall (Ou
Concrete Pouring & Shuttering for Kicker (1st Lift) of Boundary wall @ span 2 at Water Garden, as pe
Coordinates & Levels for Kicker (1st Lift) of Boundary wall @ span 2 at Water Garden, as per Highligh
Protection layer 4mm thk Modified Bituminous protection Board for Water Proofing on Foundation of
Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Grade) (Out of 8 layers) along the Wall (Ou
Stone Cladding for wall (Inner Sides) of 1 Curved Wall, at Entrance (Left Side), at Maze garden, as hig
Surface preparation prior to Backfillling along the Boundary Wall (Outer side) @ Grid (EXC3-20 to EXC
Stack Boulders Installed 4th layer (upto Level +881.00) at Left side of Water Play Garden, (Part 6) At
Stack Boulders Installed 3rd layer at Step 4, (upto level 877.07), Right side (Bottom Half Round) of
Steel Reinforcements for MCPE 3 WALL At axis 02R to 02S (as highlighted) Zone 2E 2F
Pipes Sand Cover and Protection of Potable Water Networks for (200mmØ-UPVC-Class-5). As per high
Pipes Sand Cover and Protection of Potable Water Networks for (200mmØ-UPVC-Class-5). As per high
Inspection and compaction test 2nd layer for backfilling of PC and Strip Footing Between PC 142 - 144 Z
Inspection and compaction test 2nd layer for backfilling of PC and Strip Footing Between PC 31 to 43 Zo
Inspection and compaction test 4th layer for backfilling of Promenade Bridge Zone 1E (as highlighted) (4
Level and Location for BUTTRESS BOV 60 (1ST) Zone 2A
Concreting for BUTTRESS BOV 60 (1ST) Zone 2A
Shuttering and Shear Connector for BUTTRESS BOV 60 (1ST) Zone 2A
Installation of Stub-Up UPVC Conduit (Dia.25mm 16Pcs & Box-8Pcs) for Fire Alarm System (Flashing
Installation of straight UPVC conduit (Dia.32mm Socket Outlet) for Power at the Crescent -02 (Axis 02
Installation of straight UPVC conduit (Dia. 25mm) and Box for Voice and Data (WIFI) at the Crescent-02
Installation of straight UPVC conduit (Dia. 25mm) and Box for Fire Alarm (Speaker) at the Crescent-02
Installation of straight UPVC conduit (25mm) and Box for Security at the Maze Garden Zone 5A per atta
Installation of straight UPVC conduit (25mm) and Box for Voice and Data at the Maze Garden Zone 5A p
Level and Location for BUTTRESS BOV 88, 89, 90, 91, 92 Zone 2G 2H
Level and Location for Strip Footing between PC 7 - 9 - 11 - 13 Zone 1B
Level and Location for BUTTRESS BOV 20 21 Zone 1E 1F
Shuttering and Shear Connector for BUTTRESS BOV 88, 89, 90, 91, 92 Zone 2G 2H
Gravel 3/8 Bedding & Geotextile Surround for Sub surface Drainage pipes (110mm Pipes) along the Boun
Inspection & Compaction tests of 6th Layer Backfilling (Sub-Grade) (Out of 7 layers Sub Grade) (from
Inspection & Compaction tests of 4th Layer Backfilling (Sub-Grade) (from level +875.20) for Sub surf
Inspection & Compaction tests of 5th Layer Backfilling (Sub-Grade) (Out of 5 layers and single layer
Inspection & Compaction tests of 7th Layer Backfilling (Sub-Grade) (from level +875.082) for Sub sur
Soil preparation prior to Backfilling along the Wall (Outer side) (at Bottom of Blinding level +874.19)
Stone Cladding for wall (Outer Sides) & (Both end Sides of wall) of 1 Curved Wall, at Entrance (Right
Inspection of Spatter Dash (Rough Coat) Prior to Plastering of walls Inside Hand Wash (GF-5038), Toi
Inspection of Block work (upto Final height) of 350mm thk Wall (with Insulation) at Grid 6/E-F, at Ma
Steel Reinforcement for Ring Beam & Remaining part of Wall @ Grid (1-2/Left Side and 1-4/Right Side)
Single layer 4mm thk Modified Bituminous Water Proofing Membrane for Foundation of walls (Outer S
Inspection & Compaction Tests of Single Layer Sub Garde Backfilling (Start from Bottom of Blinding)
Inspection & Compaction tests of 5th Layer Backfilling (Sub-Grade) (Out of 8 layers) along the Bounda
Stack Boulders Installed 3rd layer upto Level +875.80, at (2nd line) Inside Geyser Area, at Water Gar
Stack Boulders Installed 3rd layer upto Level +876.20, for 1st & 2nd Lines at Left Side of Planted Bed
Excavation & Soil Preparation Prior to Stack Boulders at 3rd & 4th Lines towards aviary, Inside Geyse
Installation of Rock and Boulder No. RB-283 - 3rd layer (3 of 4)
Installation of Rock and Boulder No. RB-239 - 3rd layer (3 of 4)
Installation of Rock and Boulder No. RB-283 - 2nd layer (2 of 4)
Installation of Rock and Boulder No. RB-283 1st layer (1 of 4)
Installation of Rock and Boulder No. RB-239 2nd layer (2 of 4)
"Inspection of Grouting (Vertical Joints) for Rock Boulder - RB-108 for All Layers"
Inspection of Casting Blinding Concrete under Canopy Foundation of Seating Area (1) Zone-K (SA-17) - A
Inspection of Casting Blinding Concrete under Canopy Foundation of Seating Area (1) Zone-K(SA-16) - As
Inspection of water proofing for the Duct Bank of MV Line from B/MV/19 to B/MV/06 at Zone-B (As High
Inspection of Water proofing for the Duct Bank of MV Line from B/MV/12 to B/MV/19 at Zone-B (As Hig
Surface Preparation prior to start water proofing for the Duct Bank of MV Line from B/MV/13 to B/MV/
Notification to Start Excavation for Telecommunication & (Fire & Security)Distribution Route at Zone
Surface Preparation prior to start Water Proofing for the Duct Bank of MV Line from B/MV/07 to B/MV/
"Inspection of Concrete Encasement for Storm Water Line Branch for Gully G-E-02 as highlighted "
Inspection and Compaction Test for 2nd Layer (2 of 3) backfilling (grading) at Zone - K&L (Near Crusher)
Inspection for Backfilling Sub-base under Boulder no. RB-252 (Stock Pile # 110 A-1-A)
Soil Preparation under Boulder No. RB- 252
Inspection for Backfilling Sub-base under Boulder no. RB-240 (Stock Pile # 110 A-1-A)
"Inspection of Concrete Encasement for Storm Water Line Branches for Gullies G-E-08, G-E-09, G-E-10,
Concreting of Mass Concrete for Elevator Pit at North Restaurant Zone 1N 1P
Anti Termite application under Mass Concrete of Foundation for North Restaurant (Elevator Pit) Zone 1
Concreting for Strip Footing between PC 7 - 9 - 11 - 13 Zone 1B
Shuttering for Strip Footing between PC 7 - 9 - 11 - 13 Zone 1B
Steel Reinforcements for Strip Footing between PC 7 - 9 - 11 - 13 Zone 1B
Concreting for BUTTRESS BOV 20 21 Zone 1E 1F
Shuttering and Shear Connector for BUTTRESS BOV 20 21 Zone 1E 1F
Single layer of 4mm Thick modified bituminous waterproofing under Strip footing between PC 140-142-
Surface Preparation and Solvent Base For under Strip footing between PC 140-142-144 Zone 2H (as High
Inspection And Compaction Test For Backfilling 3rd Layer (3 of 9) For Storm Water Line From MH-K-07
Inspection And Compaction Test For Backfilling 3rd Layer (3 of 9) For Foul Water Line From FW-A-3-7 T
"Inspection of Backfilling Gravel 1st Layer (1 out of 5) around the Manhole for FW-A-3-11, FW-A-3-13
Inspection for Backfilling Sub-base under Boulder no. RB-107a (Stock Pile # 110 A-1-A)
Soil Preparation under Boulder No. RB- 170a
"Inspection and Compaction Test for 8th Layer (8 of 8) Backfilling around SBC-05 (Stock Pile # 110 A-1-A
Inspection for Compaction Test for Sub-Base under canopy at Seating Area (1) Zone-L (SA-15) - As Highl
"Excavation and Soil Preparation under canopy at Seating Area (1) Zone-K (SA-17) - As Highlighted"
"Excavation and Soil Preparation under canopy at Seating Area (1) Zone-K (SA-16) - As Highlighted"
"INSPECTION FOR INSTALLATION OF GULLIES FOR - G-E-01, G-E-02, G-E-03 G-E-04, G-E-07 (As Highlighted
Inspection of Casting Reinforced Concrete for the Duct Bank of MV Line from B/MV/13 to G/MV/22 at
Inspection & Compaction tests of 6th Layer Backfilling (Sub-Grade) (from level +875.082) for Sub sur
Inspection & Compaction tests of 4th Layer Backfilling (Sub-Grade) (Out of 5 layers and single layer
Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Base) (Out of 5 layers) Behind the Boulde
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 2 layers) after gravel, Su
3rd Layer Gravel Backfilling Surround the Manholes (2 no's) (MH-D-09 & MH-D-09-03) (Type B-1 no's &
Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Grade) (Out of 3 layers) after gravel, S
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 8 layers) along the Wall (O
Installation of straight UPVC conduit (Dia. 25mm) and Box for Security (CAM) at the Crescent-02 (Axis
Aluminium Flashing & Sealant for water proofing on Foundation & Kicker of Walls (Inner Face) of Oute
Installation of straight UPVC conduit (Dia. 25mm) and Box for Voice and Data (WIFI & CAM) at the Cres
Installation of straight UPVC conduit (Dia. 25mm) and Box for Fire Alarm (Speaker) at the Crescent-02
Inspection and compaction test 1st layer for backfilling of PC and Strip Footing Between PC 142 - 144 Zo
Inspection and compaction test 1st layer for backfilling of PC and Strip Footing Between PC 31 to 43 Zon
Inspection and compaction test 3rd layer for backfilling of Promenade Bridge Zone 1E (as highlighted) (3
Inspection and compaction test 2nd layer for backfilling of MCPE 4 Zone 1N (as highlighted) (2 of 6 laye
Surface Preparation Prior to start Backfilling at PC and STRIP FOOTING between PC 22-24-26 Zone 1D (as
Level and Location for Excavation for Strip Footing Between PC 20-22 Zone 1D
Existing Level for South Admin Building Soak Away (crescent Zone 2C)
Level and Location for BUTTRESS BII 52 (1ST with beam) Zone 1N
Concreting for BUTTRESS BOI 52 (1st) (w/ beam) Zone 1N
Concreting for BUTTRESS BII 52 (1ST with beam) Zone 1N
Shuttering and Shear Connector for BUTTRESS BII 52 (1ST with beam) Zone 1N
Level and Location for BUTTRESS BOI 02 Zone 1A
Inspection & Compaction tests of 5th Layer Backfilling (Sub-Grade) (Out of 5 layers and single layer
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 5 layers and single laye
Plaster Guide Points & Accessories for Plastering of walls Inside Hand Wash (GF-5038), Toilets (GF-5
Inspection of 9 layers Block work of 350mm thk Wall (with Insulation) at Grid 6/E-F, at Management Bu
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 3 layers) Surround the Seat
Soil preparation Prior to Backfilling (From Bottom of Blinding) along Circular Walls (2, 3, 4, 5, 6, 7, 8,
Inspection & Compaction Tests of Single Layer Sub Garde Backfilling (Start from Bottom of Blinding)
2nd Coat Cementitious Waterproofing for Kicker & wall (All Sides), At 2 Straight Walls & Circular Wall
Slated Layer 4mm thk Modified Bituminous Waterproofing membrane for Waterproofing on Foundation &
Protection Layer 4mm thk Bituminous Protection Board for Waterproofing of Foundation & Kicker of Wa
Slated Layer 4mm thk Modified Bituminous Waterproofing membrane for Waterproofing on Foundation &
Protection Layer 4mm thk Bituminous Protection Board for Waterproofing of Foundation & Kicker of Wa
Aluminium Flashing & Sealant for water proofing on Foundation & Kicker of Walls (Outer Face) of Oute
Installation of Rock and Boulder No. RB-239 1st layer (1 of 4)
Inspection of Backfilling Gravel 2nd Layer (2 out of 5) around the Manhole for MH-K-6, MH-K-5, MH-K-
"Inspection of Backfilling Gravel 2nd Layer (2 out of 5) around the Manhole for FW-A-3-7, FW-A-3-8,
Inspection and Compaction Test for 1st Layer (1 of 6) Backfilling for the existing trench from stage 2 e
Inspection and Compaction Test for 1st Layer (1 of 1) Backfilling under Boulder No. RB-240 (Stock Pile #
Soil Preparation under Boulder No. RB- 240 after cutting
Inspection for Backfilling Sub-base under Boulder no. RB-277 (Stock Pile # 110 A-1-A)
"Casting Blinding Concret under Manhole MH-G-01-01, MH-G-01-02, MH-G-01-03, MH-G-01-04, MH-G
INSPECTION OF INSTALLATION OF SLAB FOR MH-F-02, MH-F-03, MH-F-04 (AS ATTACHED)
INSPECTION OF INSTALLATION OF SLAB FOR MH-A-06 (AS ATTACHED)
"Inspection and Compaction Test for NGL of Telecommunication Line at Zone - G (As Highlighted)"
"Inspection and Compaction Test for NGL of Fire & Security Line at Zone - G (As Highlighted)"
"Inspection and Compaction Test for 7th Layer (7 of 8) Backfilling around SBC-05 (Stock Pile # 110 A-1-A
Level and Location for MCPE 2 WALL at axis 02AF to 02AE Zone 2J 2K (as highlighted)
Concreting for MCPE 2 WALL at axis 02AF to 02AE Zone 2J 2K (as highlighted)
Shuttering for MCPE 2 WALL at axis 02AF to 02AE Zone 2J 2K (as highlighted)
Steel Reinforcements for MCPE 2 WALL at axis 02AF to 02AE Zone 2J 2K (as highlighted)
Level and Location for BUTTRESS BII 02 (with beam) Zone 1A
Level and Location for BUTTRESS BIV 03 Zone 1A
Protection layer of 4mm thick bituminous protection board For Strip footing between PC 193-195 Zone 2
Single layer of 4mm thick modified Bituminous water proofing membrane For Strip footing between PC
Surface Preparation and Solvent Base Primer For Strip footing between PC 193-195 Zone 2R (as Highligh
Concreting for BUTTRESS BII 02 (with beam) Zone 1A
Shuttering and Shear Connector for BUTTRESS BII 02 (with beam) Zone 1A
Concreting for BUTTRESS BIV 03 Zone 1A
Shuttering and Shear Connector for BUTTRESS BIV 03 Zone 1A
Surface Preparation Prior to start Backfilling at PC and STRIP FOOTING between PC 142-144 Zone 2H (as
Surface Preparation Prior to start Backfilling at PC and STRIP FOOTING between PC 31-43 Zone 1F 1G (as
Inspection and compaction test 1st layer for backfilling of MCPE 4 Zone 1N (as highlighted) (1 of 6 layer
Inspection and compaction test 2nd layer for backfilling of Promenade Bridge Zone 1E (as highlighted) (
Installation of Stub-Up UPVC Conduit (Dia.25mm 2Pcs & Box-1Pc) for Security System (CCTV) at the A
Installation of straight UPVC conduit (Dia.32mm Socket Outlet) for Power at the Crescent -02 (Axis 0
Installation of straight UPVC ducts (5x160mm) Medium Voltage Duct bank no. B/RC-MV/2 from Manho
Inspection & Compaction Tests of Single Layer (Final) Sub Base Backfilling (after laying Sub Grade) S
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 4 layers and single layer
Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Grade) (Out of 5 layers and single layer
Inspection & Compaction tests of 4th Layer Backfilling (Sub-Grade) (from level +875.91) for Sub
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 5 layers) Behind the Boul
Inspection & Compaction tests of 5th Layer Backfilling (Sub-Base) (from level +875.30) Sub surface
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 8 layers) along the Wall (Ou
"Excavation and Soil Preparation under canopy at Seating Area (1) Zone-L (SA-15) - As Highlighted"
Solvent Base Primer Coating prior to Membrane Waterproofing for Foundation of walls (Outer Side) o
1st Coat Cementitious Waterproofing for Kicker & wall (All Sides), At 2 Straight Walls & Circular Wall
Surface preparation prior to Stone Cladding for walls (All Sides), At 2 Straight Walls & Circular Wall (
"Inspection of Grouting (Vertical Joints) for Rock Boulder - RB-314 for All Layers"
"Inspection of Grouting (Horizontal Joints) for Rock Boulder - RB-314 for All Layers"
"Inspection of Backfilling Gravel (1st layer out of 2) for Gullies G-E-01, G-E-02, G-E-03 G-E-04, G-E-07,
Surface preparation prior to Waterproofing for footing & Kicker of 2 Straight Walls, (All Sides) at Ent
Surface Preparation prior to start water proofing for the Duct Bank of MV Line from B/MV/19 to B/MV/
Surface Preparation prior to start water proofing for the Duct Bank of MV Line from B/MV/12 to B/MV/
Inspection of Backfilling Sub Grade Above Gravel (3rd Layer Out of 5) Around The Manhole for FW-A-3-
Inspection of Backfilling Sub Grade Above Gravel (2nd Layer out of 8) around the Manhole for FW-A-3-
Installation and Fixation of Curved Steel Angles along the Ring Beam @ Grid (1-2/Right & Left Side) a
Inspection And Compaction Test For Backfilling 5th Layer (5 of 14) For Foul Water Line From FW-A-3-6.
Inspection of Backfilling Sub Grade Above Gravel (4th Layer out of 8) around the Manhole for FW-A-3-6
Inspection of Casting Reinforced Concrete for the Duct Bank of MV Line from G/MV/22 to G/MV/29 at Z
Inspection of Formwork for the Duct Bank of MV Line from G/MV/22 to G/MV/29 at Zone-G (As Highligh
Inspection of Steel Reinforcement for the Duct Bank of MV Line from G/MV/22 to G/MV/29 at Zone-G (A
Inspection of Thrust Block for UPVC Pipe (250mm) for Fire Water Line at Zone-B - As Highlighted in the
Inspection and Compaction Test for 1st Layer (1 of 1) Backfilling under Boulder No. RB-277 (Stock Pile #
Inspection for Backfilling Sub-base under Boulder no. RB-283 (Stock Pile # 110 A-1-A)
Inspection for Backfilling Sub-base under Boulder no. RB-319 (Stock Pile # 110 A-1-A)
"Inspection and Compaction Test for 6th Layer (6 of 8) Backfilling around SBC-05 (Stock Pile # 110 A-1-A
Sand Bedding under pipe for Fire Water Line from B/F/12 to Thrust Block at Zone-B & C as highlighted i
"Inpection of Casting Concrete for Short Piece & Surface Preperation prior to start waterproofing
Level and Location for BUTTRESS BIV 20 21 Zone 1E 1F
Level and Location for Strip footing Between PC 127-129 Zone 2F
'Pipe Installation of Storm Water Line- Outfall F for (315mmØ-upvc class 4) . (G-F-15,17,18,21,23,25,
Level and Location for BUTTRESS BOV 61 (1st) Zone 2A
Level and Location for BUTTRESS BOV 62, 63 (2ND) Zone 2A
Level and Location for BUTTRESS BOI 53 (1st with beam) Zone 1N
Installation and Survey Report for Location and Levels of Anchor Bolts for CANOPY @ BII 52zone 1N oute
Shuttering for BUTTRESS BIV 20 21 Zone 1E 1F
Concretng for Strip Footing between PC 127-129 Zone 2F
Shuttering for Strip Footing between PC 127-129 Zone 2F
Steel Reinforcements for Strip Footing between PC 127-129 Zone 2F
Concreting for BUTTRESS BOV 61 (1st) Zone 2A
Shuttering for BUTTRESS BOV 61 (1st) Zone 2A
Concreting for BUTTRESS BOV 62, 63 (2ND) Zone 2A
Shuttering for BUTTRESS BOV 62, 63 (2ND) Zone 2A
Steel Reinforcements for BUTTRESS BOI BOV 03 Zone 1A
Concreting for BUTTRESS BOI 53 (1st with beam) Zone 1N
Shuttering for BUTTRESS BOI 53 (1st with beam) Zone 1N
Steel Reinforcements for BUTTRESS BII BIV 93,94 Zone 2A 2B
Pipe Installation of Fire Fighting Networks for (250mmØ-UPVC-Class-5), Including Thrust Blocks. As p
Concrete pouring & Shuttering for Ring Beam & Remaining part of Wall @ Grid (14-23/Left Side along
Coordinates & Levels for Ring Beam & Remaining part of Wall @ Grid (14-23/Left Side along B.O.H), o
Installation and Fixation of Anchor Bolts and Check Coordinates & Levels for Ring Beam @ Grid (14-23
Stack Boulders Installed 3rd layer at Step 4, (upto level 877.07), Right side (Top Half Round) of Gey
Stack Boulders Installed 1st layer at Step 3, (upto level 875.95), Left side of Geyser Garden, at Wate
Installation of straight UPVC Duct Bank (Dia. 4 inch) for Low Current (Fire and Security FA & SEC)
Stack Boulders Installed 2nd layer upto Level +875.80, at Bottom Right Side of Planted Bed 1, Inside
Stone Coping on Boundary wall (after Stone Cladding for walls) @ Span 33, 34 & 35 of Water Garden,
Stone Coping on Boundary wall (after Stone Cladding for walls) @ Span 36, 37, 38 & 39 of Water Gard
Stack Boulders Installed 2nd layer upto Level +875.70, for 2nd Line, at Left Side of Planted Bed 2, In
Stack Boulders Installed 1st layer upto Level +875.20, for 2nd Line, at Left Side of Planted Bed 2, In
Excavation & Soil Preparation Prior to Stack Boulders 2nd Line towards aviary, Inside Geyser Garden,
Excavation & Soil Preparation Prior to Stack Boulders 2nd Line at Left Side of Planted Bed 2, Inside
Stack Boulders Installed 3nd layer (upto Level +880.50) at Left side of Water Play Garden, (Part 6) At
Stack Boulders Installed 2nd layer upto Level +875.70, at Left Side of Planted Bed 3, Inside Water Pl
Stack Boulders Installed 1st layer upto Level +875.20, at Left Side of Planted Bed 3, Inside Water Pla
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 5 layers) Behind the Bould
Inspection & Compaction tests of 5th Layer Backfilling (Sub-Grade) (Out of 7 layers Sub Grade) (from
Inspection & Compaction tests of 2nd Layer Backfilling (Sub Grade) Between Geyser Garden & Aviary Ga
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 4 layers and single layer
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 5 layers and single layer
Surface Preparation Prior to Backfilling, Between Geyser Garden & Aviary Garden), at highlighted are
Stack Boulders Installed 4th layer (upto Level +877.50) at Top, Left & Right Side of Mist Garden (Part
Stack Boulders Installed 7th layer at Level +878.00, (Part 4) along Planted Bed 2 to 3 and above, Ins
Stack Boulders Installed at level +876.68, Between Boat Garden and Boundary wall span (9 to 12), In
Coordinates & Levels for Wall & Buttress of Boundary wall @ Grid (11-16/Right Side), Behind Plant ro
Stack Boulders Installed 1st layer upto Level +875.40, at Bottom Right Side of Planted Bed 1, Inside
Stone Cladding for wall (Inner Sides) of 1 Curved Wall, at Entrance (Right Side), at Maze garden, as hi
Stone Cladding for Circular wall (10) Half part 2 (Outer Side), Inside Maze garden, as highlighted area
Stone Cladding for Walls (Outer Face) of Outer Canopy 1, at Outside of Physic Garden, at highlighted
Stone Cladding for Walls (Outer Side) of Plant Room, at Discovery Garden at highlighted area in atta
Stone Cladding for (Remaining) Boundary wall (Inner Side) & Both end Sides, at Discovery Garden at h
Concrete Pouring & Shuttering for Wall & Buttress of Boundary wall @ Grid (11-16/Right Side), Behind
Concrete Pouring & Shuttering for Footing of Boundary wall @ span 2 at Water Garden, as per Highli
Stack Boulders Installed 2nd layer upto Level +875.40, Inside Geyser Area, at Water Garden, At Highl
Stack Boulders Installed 1st layer upto Level +875.00, Inside Geyser Area, at Water Garden, At Highli
Installation of Straight UPVC Conduit (Dia.25mm 2Pcs & Box 2Pcs) for Fire Alarm System (Break Glass
Installation of UPVC Conduit (Dia.25mm 4Pcs & Box -3Pcs) for Security System (CCTV & CARD READER)
Installation of straight UPVC ducts (2x160mm ) Low Voltage Network (Submain Cables R2/LV1-03 in bet
Installation of straight UPVC ducts (4x160mm & Spare 1x110mm ) Low Voltage Network (Submain Cabl
"Inspection of Grouting (Vertical Joints) for Rock Boulder - RB-266A for All Layers"
"Inspection of Grouting (Horizontal Joints) for Rock Boulder - RB-266A for All Layers"
"Inspection of Grouting (Vertical Joints) for Rock Boulder - RB-266B for All Layers"
"Inspection of Grouting (Horizontal Joints) for Rock Boulder - RB-266B for All Layers"
Inspection of Concrete Pouring for the Duct Bank of Telecommunications Line between B/TL/421 to B/T
Inspection of Formwork for the Duct Bank of Telecommunications Line between B/TL/421 to B/TL/37 at
Pipe Installation of Fire Fighting Networks for (250mmØ-UPVC-Class-5), Including Thrust Blocks. As p
Inspection of Concrete Pouirng for the Duct Bank of Fire & Security Distribution Line between B/FS/21
Inspection of Formwork for the Duct Bank of Fire & Security Distribution Line between B/FS/21 to B/FS/
"Soil Preperation Prior to Start Backfill Gravel for Catch Basin G-E-01, G-E-02, G-E-03 G-E-04, G-E-07, G-
"Inspection of Concrete Pouring for the Wall and Top Slab of SBC-06 (As Highlighted)"
"Inspection of Formwork for the Wall and Top Slab of SBC-06 (As Highlighted)"
Inspection of Steel Reinforcement for the Top Slab of SBC-06 (As Highlighted)
"Inspection and Compaction Test for Backfilling (2nd Layer out of 4) for Storm Water Line from MH-E-01-
Inspection And Compaction Test For Backfilling 2nd Layer (2 of 9) For Storm Water Line From MH-K-07
Inspection And Compaction Test For Backfilling 2nd Layer (2 of 9) For Foul Water Line From FW-A-3-7
INSPECTION OF INSTALLATION OF SLAB FOR MH-E-04 (AS ATTACHED)
"Inspection For Manhole Base Installation And UPVC Pipe Connection For MH-E-04 as highlighted "
Inspection of Formwork for the Duct Bank of MV Line from B/MV/13 to G/MV/22 at Zone-B&G (As Highl
Inspection of Steel Reinforcement for the Duct Bank of MV Line from B/MV/13 to G/MV/22 at Zone-B&G
Excavation for MV Line from B/MV/16 TO B/MV/14 including Pit - B/MV/05, B/MV/14 at Zone-B as highl
Inspection and Compaction Test for 3rd Layer (3 of 3) backfilling (grading) at Zone - K (Near RB-333) as
Inspection and Compaction Test for 2nd Layer (2 of 3) backfilling (grading) at Zone - K (Near Tower-3) a
Soil Preparation under Boulder No. RB- 319
Soil Preparation under Boulder No. RB- 283
"Inspection and Compaction Test for 5th Layer (5 of 8) Backfilling around SBC-05 (Stock Pile # 110 A-1-A
Soil Preparation prior to start backfilling for the existing trench from stage 2 excavation (the level an
Soil Preparation under Boulder No. RB- 277
Inspection and compaction test 1st layer for backfilling of Promenade Bridge Zone 1E (as highlighted) (1
Steel Reinforcements for BUTTRESS BOI BOV 84, 85, 86 Zone 2F 2G
Steel Reinforcements for Infill Wall Between BI 126-127 (Inner) as highlighted Zone 2R
Warning Tape Installation for Storm Water Line Outfall-G for (600mmØ-PP-Corrugated) from ( MH-G
300 mm Gravel 3/8" Backfilling and Geotextile for Storm Water Line Outfall-G for (600mmØ-PP-Cor
Warning Tape Installation for Storm Water Line Outfall-A for (315mmØ-UPVC- Class-4 ) from (MH-A-
Warning Tape Installation for Foul Water Line for (250mmØ-UPVC- Class 4) from (FW-A-13-5 to FW-A-
300 mm Gravel 3/8" Backfilling and Geotextile for Foul Water Line for (250mmØ-UPVC- Class 4) from
Warning Tape Installation for Storm Water Line Outfall-G for (400mmØ, 450mmØ-UPVC- Class 4) fro
300 mm Gravel 3/8" Backfilling and Geotextile for Storm Water Line Outfall-G for (400mmØ, 450mmØ
Warning Tape Installation for Foul Water Line for (160mmØ- UPVC- Class 4) from (FW-A-3-14 to FW
300 mm Gravel 3/8" Backfilling and Geotextile for Foul Water Line for (160mmØ- UPVC- Class 4) fro
Warning Tape Installation for Foul Water Line for (160mmØ & 110mmØ - UPVC- Class 4) from (FW-A
300 mm Gravel 3/8" Backfilling and Geotextile for Foul Water Line for (160mmØ & 110mmØ - UPVC-
Stack Boulders Installed at level +876.40, 2 Places, Between Boat Garden and Boundary wall span (9 &
Inspection & Compaction tests of Single (Final) Layer Backfilling (Sub-Base) (after 2 layers Sub G
Inspection & Compaction tests of 1st Layer Backfilling (Sub Grade) Between Geyser Garden & Aviary Ga
Inspection & Compaction tests of Single (Final) Layer Backfilling (Sub-Base) (after 3 layers Sub Gra
Inspection & Compaction tests of Single (Final) Layer Backfilling (Sub-Base) (after 2 layers Sub Grad
Excavation & Bed Preparation for Sub surface Drainage pipes (110mm Pipes) along the Boundary wall (I
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 3 layers) after gravel, S
Coordinates & Levels for Footing of Boundary wall @ span 2 at Water Garden, as per Highlighted are
Steel Reinforcement for Footing & Kicker of Boundary wall @ span 2 at Water Garden, as per Attach
Inspection & Compaction Tests of Single Layer Sub Garde Backfilling Surround the Manholes (Type 'A
Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Grade) (Out of 6 layers) Surround the Man
Surface Preparation & Levels prior to Backfilling Surround the Seat walls B, D, E & F (All Sides), at S
Stack Boulders Installed 6th layer upto level +878.40, Between Boat Garden and Boundary wall span (3
Inspection & Compaction Tests of Single (Final) Layer Sub Base Backfilling (Start from Bottom of Blin
Stack Boulders Installed 2nd layer upto Level +875.70, at Left Side of Planted Bed 2, Inside Water Pl
Stack Boulders Installed 1st layer upto Level +875.20, at Left Side of Planted Bed 2, Inside Water Pla
Excavation & Soil Preparation at Left Side of Planted Bed 2, Inside Water Play Garden, at Water Garde
Installation of Rock and Boulder No. RB 314 - 4th Layer (4 of 4)
Installation of Rock and Boulder No. RB 314 - 3rd Layer (3 of 4)
Installation of Rock and Boulder No. RB 314 - 2nd Layer (2 of 4)
Excavation for Fire & Security Distribution Line from (B/FS/14 to B/FS/06) including Pit B/FS/14, B/FS/
Excavation for Telecommunication Line from (B/TL/10 to C/TL/14) including pit B/TL/10, B/TL/12, B/TL/
Casting Blinding Concret under Manhole MH-G-01-05, MH-G-01-06, MH-G-01-07, and Gullies G-G-63&6
"Inspection of Backfilling Gravel (2nd Layer of 2) G-E-08, G-E-09, G-E-10, G-E-11, G-E-12, G-E-13 - AS Hig
"Inspection of Backfilling Gravel 2nd Layer (2 of 3) around the Manhole for MH-E-01-1, MH-E-01-2, MH-
Inspection For Installation Of Slab For (MH-D-08) (As Highlighted).
INSPECTION FOR INSTALLATION OF ALL RINGS FOR MH-D-08 . (As Highlighted)
"Inspection and Compaction Test for 4th Layer (4 of 8) Backfilling around SBC-05 (Stock Pile # 109 A-1-A
"Inspection of Backfilling Gravel (4th, 5th Layer out of 5) around the Manhole for MH-D-01 as Highligh
Inspection of Backfilling Sub Grade Above Gravel (1st Layer out of 1) around the Manhole for MH-D-08
Inspection of Backfilling Gravel (1ST, 2ND, 3RD, 4TH, 5TH Layer out of 5) around the Manhole for MH-
"Inspection of Backfilling Gravel 1st Layer (1 of 3) around the Manhole for MH-E-01-1, MH-E-01-2, MH-
Surface Preparation Prior to start Backfilling at Promenad Bridge foundation (as highlighted)
Inspection and compaction test 2nd layer for backfilling of PC and Stripfooting PC 8-10-12-14 Zone 1B (a
Inspection and compaction test 5th layer for backfilling of PC and Stripfooting PC 34-36-38-40-42-44 Zo
Level and Location for BUTTRESS BOI 77, 78, 79, 80, 81 Zone 2E 2F
Concreting for Strip Footing between PC 193-195 Zone 2R
Concreting for BUTTRESS BOI 77, 78, 79, 80, 81 Zone 2E 2F
Shuttering and Shear Connector for BUTTRESS BOI 77, 78, 79, 80, 81 Zone 2E 2F
Steel Reinforcements for MCPE 2 WALL at axis 02AH Zone 2K (as highlighted)
Installation of straight UPVC ducts (Dia 6 inch) Mediam Voltage Duct bank 4X160MM BETWEEN MA
Excavation & Bed Preparation for Electrical Lines (400mm trench for Sub main cables of Power Contai
Inspection & Compaction Tests of Single Layer Sub Garde Backfilling (Upto Level +876.433) (after layi
Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Grade) (Out of 3 layers and single laye
Inspection of 1st & 2nd Layers of Gravel Backfilling Surround the Manhole (1 no's: MH-C-1), Inside W
Surface preparation prior to Backfilling Surround the Manhole (1 no's: MH-C-1), Inside Water Garden,
Inspection & Compaction tests of Single (Final) Layer Backfilling (Sub-Base) (After Laying 3 layers
Inspection & Compaction tests of 4th Layer Backfilling (Sub-Grade) (Out of 5 layers and single layer
Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Grade) (Out of 5 layers and single layer
Protection Layer 4mm thk Bituminous Protection Board on Waterproofing of footing & Kicker of Circular W
Soil preparation prior to Backfilling along the Wall (Outer side) (at Bottom of Blinding level +874.19)
Inspection & Compaction tests of Single (Final) Layer Backfilling (Sub-Base) (after Sub grade) Surroun
Inspection of Plastering on External Wall Elevations at Grid (20/I-M), (1-2/E&F) & (10-10'/B-C) at Ma
Inspection of Spatter Dash (Rough Coat) Prior to Plastering of walls Inside Toilets (GF-5004, 5006, 5
Surface Preparation prior to Waterproofing for Floor area Inside Toilets (5061, 5062, 5063, 5064, 50
Level and Location for RING BEAM zone 2Q outer Axis 02-2, 02AW to 02AZ (as highlighted)
Level and Location for MCPE 2 WALL (OUTER ) at axis 02AG to 02AF Zone 2K (as highlighted)
Installation and Survey Report for Location and Levels of Anchor Bolts for RING BEAM zone 2Q outer Ax
Steel Reinforcement for Ring Beam Zone 2Q Outer Axis 02-2, 02AW to 02AZ
Concreting for MCPE 2 WALL (OUTER ) at axis 02AH to 02AG Zone 2K (as highlighted)
Shuttering for Ring Beam Zone 2Q Outer Axis 02-2, 02AW to 02AZ
Concreting for MCPE 2 WALL (OUTER ) at axis 02AG to 02AF Zone 2K (as highlighted)
Shuttering for MCPE 2 WALL (OUTER ) at axis 02AG to 02AF Zone 2K (as highlighted)
Installation of Rock and Boulder No. RB 266B - 4th Layer (4 of 4)
Installation of Rock and Boulder No. RB 266B - 3rd Layer (3 of 4)
Installation of Rock and Boulder No. RB 266A - 4th Layer (4 of 4)
Excavation for Car Park Tree Pit as Details D-38-1, as highlighted in the attached drawing
Excavation for Car Park Tree Pit as Details D-38-1, as highlighted in the attached drawing
Installation of Rock and Boulder No. RB 314 - 1st Layer (1 of 4)
"Inspection of Grouting (Vertical Joints) for Rock Boulder - RB-062 for All Layers"
Sand Bedding under pipe for Potable Water Line from B/PW/11 to Near B/PW/06 at Zone-B&C as highli
Inspection and Compaction Test for 1st Layer (1 of 3) backfilling (grading) at Zone - K&L (Near Crusher)
"Inspection and Compaction Test for 3rd Layer (3 of 8) Backfilling around SBC-05 (Stock Pile # 109 A-1-A
Surface Preparation prior to start Waterproofing for SBC-06 - as highlighted
"Inspection of Backfilling Gravel 1st Layer (1 out of 5) around the Manhole for MH-K-6, MH-K-5, MH-
"Inspection of Backfilling Gravel 1st Layer (1 out of 5) around the Manhole for FW-A-3-7, FW-A-3-8,
Inspection And Compaction Test For Backfilling 5th Layer (5 of 14) For Foul Water Line From FW-A-3-6.
Inspection of Backfilling Sub Grade Above Gravel (2nd Layer Out of 5) Around The Manhole for FW-A-3-
Inspection of Backfilling Sub Grade Above Gravel (1st Layer out of 8) around the Manhole for FW-A-3-6
Inspection of Backfilling Sub Grade Above Gravel (3rd Layer out of 8) around the Manhole for FW-A-3-6
Steel Reinforcements for TUNNEL 2 Shaft wall at Zone 2F (as highlighted)
Installation of straight UPVC ducts (5x160mm) Mediam Voltage Duct bank no. BB/D-MV/19 from Manh
Inspection And Compaction Test For Backfilling 4th Layer (4 of 14) For Foul Water Line From FW-A-3-6.
"Inspection For Installation Of All Rings (Riser) For FW-A-13-4 (As Highlighted)"
"Inspection For Manhole Base Installation And UPVC Pipe Connection For FW-A-13-3, FW-A-13-4 as highl
Concreting for BUTTRESS BIV 60 (1st) Zone 2A
"Surface Preparation Prior to Start Backfilling Gravel For Manhole MH-K-02, MH-K-03, MH-K-04 - AS Hi
Notification to start backfilling for the existing trench from stage 2 excavation (the level and location
Shuttering and Shear Connector for BUTTRESS BOV 77, 78, 79, 80, 81 Zone 2E
Installation of straight UPVC ducts (Dia 6 inch) Mediam Voltage Duct bank 5X160MM BETWEEN MA
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 2 layers and single layer
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 3 layers and single laye
Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Grade) (Out of 3 layers and single laye
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 2 layers and single laye
Inspection of 1st, 2nd & 3rd Layers of Gravel Backfilling Surround the Manhole (01 no's) (MH-C-3-1),
Surface preparation prior to Backfilling Surround the Manhole (01 no's) (MH-C-3-1), (from Bottom of B
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 2 layers and single laye
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 2 layers and single layer
Steel Reinforcement for Ring Beam & Remaining part of Wall @ Grid (14-23/Left Side upto B.O.H End)
1st Coat Damp proofing for footing & Kicker of 2 Curved Walls, (Inner & Outer Sides) at Entrance, at
Inspection & Compaction tests of Single Layer Backfilling (Sub-Grade) (Out of single layer Sub grade
Concrete pouring & Shuttering for Remaining part of Wall & Buttress (from 3.80m upto Bottom of Ring
Aluminium Flashing & Sealant for Waterproofing on Foundation & wall of Seat walls "B, D, E & F" (All
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 6 layers) Surround the Ma
2nd Coat Cementitious Waterproofing for Kicker & Above of walls (Outer Side) of Plant room, at Disc
Inspection of Plastering on External Wall Elevations at Grid (12-14/W), (19-20/Q) & (19/Q-T) at Mana
Plaster Guide Points & Accessories for Plastering of walls Inside Toilets (GF-5004, 5006, 5061, 5062
Installation and Fixation of Curved Steel Angle along the Ring Beam @ Grid (14-23/Left Side) Behind
Level and Location for RING BEAM (Outer) Axis 02-2, 02AH to 02AE Zone 2K
Level and Location for BUTTRESS BIV 60 (1st) Zone 2A
Installation of Rock and Boulder No. RB 266B - 2nd Layer (2 of 4)
Level and Location for BUTTRESS BIV 62 63 (2nd) Zone 2A 2B
Installation of Rock and Boulder No. RB 266A - 3rd Layer (3 of 4)
Installation and Survey Report for Location and Levels of Anchor Bolts for RING BEAM (outer) at Zone 2K
Inspection and Compaction Test for 1st Layer (1 of 2) backfilling (grading) at Zone - K (Near Tower-3) as
Surface Preparation Prior to start Backfilling at MCPE 4 Zone 1N (as highlighted)
Inspection and Compaction Test for 2nd Layer (2 of 3) backfilling (grading) at Zone - K (Near RB-333) as
Inspection and compaction test 4th layer for backfilling of PC 28-30 Zone 1E (as highlighted) (4 of 4 lay
Inspection for Rough Grading (Cut & Fill) upto (-40cm) from the Final Grading Level - at Zone-K (Next to
Inspection and Compaction Test for 6th Layer (6 of 6) backfilling (grading) at Zone - K (Next to RB-334)
Shuttering for RING BEAM (Outer) Axis 02-2, 02AH to 02AE Zone 2K
Inspection of Casting Reinforced Concrete for the Duct Bank of MV Line from B/MV/19 to B/MV/06 at Z
Inspection of Formwork for the Duct Bank of MV Line from B/MV/19 to B/MV/06 at Zone-B (As Highligh
Steel Reinforcements for RING BEAM (Outer) Axis 02-2, 02AH to 02AE Zone 2K
Inspection of Steel Reinforcement for the Duct Bank of MV Line from B/MV/19 to B/MV/06 at Zone-B (A
"Inspection and Compaction Test for 2nd Layer (2 of 8) Backfilling around SBC-05 (Stock Pile # 109 A-1-A
Concreting for Ground Beam Between PC 180 - 182 Zone 2N
Shuttering for Ground Beam Between PC 180 - 182 Zone 2N
Steel Reinforcement for Ground Beam Between PC 180 - 182 Zone 2N
Inspection for Backfilling Sub-base under Boulder No. RB-239 (SP # 109 A-1-A)
Soil Preparation under Boulder No. RB- 239 after cutting
"Inspection and Compaction Test for 1st Layer (1 of 8) Backfilling around SBC-05 (Stock Pile # 109 A-1-A
Geotextile and 50mm screed under Strip Footing Between PC 127-129 Zone 2F
Shuttering and Shear Connector for BUTTRESS BIV 60 (1st) Zone 2A
Concreting for BUTTRESS BIV 62 63 (2nd) Zone 2A 2B
Shuttering and Shear Connector for BUTTRESS BIV 62 63 (2nd) Zone 2A 2B
Pipe Installation of Storm Water Line Outfall-G for (600mmØ-PP-Corrugated) from ( MH-G-03 to MH
Bedding of Gravel 3/8" and Geotextile Surrounding Storm Water Line Outfall-G for (600mmØ-PP-Co
Warning Tape Installation for Storm Water Line Outfall-L for (450mmØ-UPVC- Class 4) from (MH-L-04
300 mm Gravel 3/8" Backfilling and Geotextile for Storm Water Line Outfall-L for (450mmØ-UPVC- Cla
Warning Tape Installation for Storm Water Line Outfall-G for (800mmØ-PP-Corrugated) from ( MH-G-03
300 mm Gravel 3/8" Backfilling and Geotextile for Storm Water Line Outfall-G for (800mmØ-PP-Corrug
Pipe Installation of Fire Fighting Networks for (250mmØ-UPVC-Class-5), Including Thrust Blocks. As p
Bedding of Gravel 3/8" and Geotextile surrounding Storm Water Line Outfall-A for (315mmØ-UPVC- C
Pipe Installation of Foul Water Line for (250mmØ-UPVC- Class 4) from (FW-A-13 to FW-A-13-5). At C
Bedding of Gravel 3/8" and Geotextile surrounding Foul Water Line for (250mmØ-UPVC- Class 4) fr
Pipe Installation of Storm Water Line Outfall-L for (450mmØ-UPVC- Class 4) from (MH-L-04 to Outfa
Bedding of Gravel 3/8" and Geotextile Surrounding Storm Water Line Outfall-L for (450mmØ-UPVC- Cl
Pipe Installation of Foul Water Line for (250mmØ-UPVC- Class 4) from (FW-A-13-5 to FW-A-13-8). At
Bedding of Gravel 3/8" and Geotextile Surrounding Foul Water Line for (250mmØ-UPVC- Class 4) fro
Pipe Conection to the Catch Basin of Storm Water Line Outfall-E for (315mmØ-UPVC- CLASS 4) from
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 3 layers and single layer
Surface preparation prior to Waterproofing and Application of Primer coating, 1st & 2nd Coats of D
Excavation & Soil Preparation at Between Boat Garden & Boundary wall (Span 11 & 12) Inside Boat Ga
Excavation & Soil Preparation Between Geyser Garden & Mist Garden (Left side) , at highlighted area
Primer Coating Prior to Damp proofing for footing & Kicker of 2 Curved Walls, (Inner & Outer Sides) a
Slated Layer 4mm thk Modified Bituminous Waterproofing membrane for Foundation & wall of Seat wall
"Inspection of Backfilling Gravel (1st Layer of 2) G-E-08, G-E-09, G-E-10, G-E-11, G-E-12, G-E-13 - AS Hig
Inspection of Casting Reinforced Concrete for the Duct Bank of MV Line from B/MV/13 to B/MV/06 at Z
Sand Bedding for Fire Alarm & Security Lines, Telecom Lines, Emergency Lines and Low Voltage Lines,
Inspection & Compaction Tests of Single Layer Sub Garde Backfilling (Start from Bottom of Blinding) B
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 3 layers) after gravel, S
2nd Layer Gravel Backfilling Surround the Manholes (4 no's) (MH-D-09, MH-D-09-03, MH-D-10 & MH-D-1
Stone Cladding for (Remaining) Boundary wall (Outer Side), at Elevation F, at Discovery Garden at hig
1st Coat Cementitious Waterproofing for Kicker & Above of walls (Outer Side) of Plant room, at Disco
Inspection of Formwork for the Duct Bank of MV Line from B/MV/13 to B/MV/06 at Zone-B (As Highligh
Surface Preparation Prior to Stone Cladding for walls (Outer Side) of Plant room, at Discovery Garden
Inspection of Steel Reinforcement for the Duct Bank of MV Line from B/MV/06 to B/MV/13 at Zone-B (A
2nd Coat Cementitious Waterproofing for Kicker & Wall of Circular Walls (2, 3, 4, 5, 6 & 7) (Inner & Ou
Surface preparation prior to Stone Cladding for walls (Inner & Outer Sides) of Circular Walls (2, 3, 4,
2nd Coat Cementitious Waterproofing for footing & Kicker of 2 Curved Walls, (Inner & Outer Sides) at
"Excavation for MV Line from B/MV/16 TO B/MV/06 including Pit - B/MV/16 at Zone-B as highlighted i
INSPECTION FOR INSTALLATION OF SLABS FOR (FW5, FW6) - As Highlighted
INSPECTION FOR INSTALLATION OF SLAB FOR FW-A-13. (As Highlighted)
"Inspection and Compaction Test for 8th Layer (8 of 8) Backfilling around SBC-08 (Stock Pile # 109 A-1-A
Soil Preparation prior to start backfill around SBC-05 at Zone - 2B - as highlighted
"Inspection For Installation Of Slabs For (FW-A-13-1, FW-A-13-2) (As Highlighted)."
Inspection and compaction test 1st layer for backfilling of PC and Stripfooting PC 8-10-12-14 Zone 1B (as
"Inspection For Installation Of All Rings (Riser) For FW-A-13-1, FW-A-13-2, (As Highlighted)"
Level and Location for BUTTRESS BOI 02 Zone 1A
"Inspection For Manhole Base Installation And UPVC Pipe Connection For FW-A-13-1, FW-A-13-2 as highl
Steel Reinforcements for BUTTRESS BOI BOV 87, 88, 89, 90, 91, 92, Zone 2G 2H
INSPECTION FOR INSTALLATION OF ALL RINGS FOR FW-A-13. (As Highlighted)
Steel Reinforcements for BUTTRESS BII BIV 95 Zone 2J
Concreting for BUTTRESS BOI 02 Zone 1A
Shuttering and Shear Connector for BUTTRESS BOI 02 Zone 1A
Protection layer of 4mm thick bituminous protection board for Strip Footing Between PC 31-33-35-37
Single layer of 4mm thick modified bituminous waterpoofing for Strip Footing Between PC 31-33-35-3
Surface Preparation and Solvent Base PrimerStrip Footing Between PC 31-33-35-37-39-41-43, 32-34-36
Inspection And Compaction Test For Backfilling 3rd Layer (3 of 14) For Foul Water Line From FW-A-3-6.
Geo Textile on Blinding under boundary wall at Span 2 @ Water Garden at highlighted area in attach
Protection Layer 4mm thk. Bituminous Protection Board (Both sides 500mm wide) on Blinding under b
Single Layer 4mm thk Modified Bituminous Water proofing Membrane (Both sides 500mm wide) on Bli
2nd Coat Cementitious Water Proofing on Blinding under boundary wall at Span 2 @ Water Garden at
1st Coat Cementitious Water Proofing on Blinding under boundary wall at Span 2 @ Water Garden at
Solvent Base Primer Coating (Both sides 500mm wide) on Blinding prior to Water proofing membrane
Surface preparation prior to Water proofing on Blinding under boundary wall at Span 2 @ Water Gard
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 3 layers and single laye
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 3 layers and single laye
Inspection & Compaction tests of Final Layer Backfilling (Sub-Base) (After Single layer Sub Grade fro
Inspection & Compaction tests of Single Layer Backfilling (Sub-Grade) (Out of single layer Sub grade
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 5 layers and single laye
Inspection & Compaction tests of Final Layer Backfilling (Sub-Base) (After 2 layers of Sub Grade fro
Steel Reinforcement for Wall & Buttress of Boundary wall @ Grid (11-16/Right Side), Behind Plant roo
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 2 layers and single layer
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 2 layers) Between Circular
Stone Cladding for Boundary wall at Elevation "F" (Inner Face) @ Sound & Light Garden, As per Attac
Stack Boulders Installed 5th layer upto level +878.10, Between Boat Garden and Boundary wall span (3
Stack Boulders Installed 6th layer upto Level +878.00 (Part 3), at Bottom side of Planted Bed 1, Insi
Stack Boulders Installed 2nd layer at Step 4, (upto level 876.65), Right side of Geyser Garden, at Wat
Inspection & Compaction tests after Excavation for Fire Alarm & Security Lines, Telecom Lines, Emerg
Stone Coping on Boundary wall (after Stone Cladding for walls) @ Span 40, 41 & 42 of Water Garden,
Stone Coping on Boundary wall (after Stone Cladding for walls) @ Span 43, 44 & 45 of Water Garden,
Installation of straight UPVC Duct Bank (Dia. 4 inch) for Low Current (Telecom Communication TC) fr
Surface Preparation and solvent base primer for Outer MCPE 3 wall axis 03-2, 03A to 02R (as highlighted
Inspection and compaction test 4th layer for backfilling of PC and Stripfooting PC 34-36-38 Zone 1F (as h
Surface Preparation Prior to start Backfilling around Strip footing & Pilecap 8-10-12-14 as highlighted Z
Level and Location for 3rd layer Mass Concrete for Stip footing between PC 24-26 Zone 1D
Level and Location for 2nd layer Mass Concrete for Stip footing between PC 22-24-26 Zone 1D
Level and Location for 3rd layer Mass Concrete for Stip footing between PC 140-142-144-146 Zone 2H
Level and Location for BUTTRESS BIV 61 (1st) Zone 2A
Level and Location forBUTTRESS BII 77, 78, 79, 80, 81 (with beam) Zone 2E
Concreting of 3rd layer Mass Concrete for Stip footing between PC 24-26 Zone 1D
Shuttering of 3rd layer Mass Concrete for Stip footing between PC 24-26 Zone 1D
Concreting of 2nd layer Mass Concrete for Stip footing between PC 22-24-26 Zone 1D
Shuttering of 2nd layer Mass Concrete for Stip footing between PC 22-24-26 Zone 1D
Single layer of 4mm thick modified bituminous water proofing membrane under Strip Footing Between
Surface Preparation and Solvent base primer under Strip Footing Between PC 127-129 Zone 2F
Concreting of 3rd layer Mass Concrete for Stip footing between PC 140-142-144-146 Zone 2H
Shuttering of 3rd layer Mass Concrete for Stip footing between PC 140-142-144-146 Zone 2H
Concreting for BUTTRESS BIV 61 (1st) Zone 2A
Shuttering and Shear Connector for BUTTRESS BIV 61 (1st) Zone 2A
Surface Preparation and Solvent Base Primer for two Foundation of Promenade Bridge Zone 2E (as highl
Concreting for BUTTRESS BII 77, 78, 79, 80, 81 (with beam) Zone 2E
Installation of Rock and Boulder No. RB 266B - 1st Layer (1 of 4)
Shuttering and Shear Connector for BUTTRESS BII 77, 78, 79, 80, 81 (with beam) Zone 2E
Installation of Rock and Boulder No. RB 266A - 2nd Layer (2 of 4)
Inspection of Casting Reinforced Concrete for the Duct Bank of MV Line from B/MV/07 to B/MV/10 at Z
Inspection of Formwork for the Duct Bank of MV Line from B/MV/07 to B/MV/10 at Zone-B (As Highligh
Inspection of Steel Reinforcement for the Duct Bank of MV Line from B/MV/07 to B/MV/10 at Zone-B (A
Inspection for Backfilling Sub-base under Boulder no. RB-314 (Stock Pile # 109 A-1-A)
Excavation for Potable Water Line from B/PW/11 to Near B/PW/06 including Pit B/PW/11, B/PW/08, B
Excavation for Fire Water Line from B/F/12 to Thrust Block including Pit B/F/12, B/F/13, B/F/10, B/F/17
Soil Preparation under Boulder No. RB- 314
Inspection of Backfilling Sub grade above gravel (3rd Layer Out Of 3) around the Manhole for MH-D-02
"Soil Preperation Prior to Start Backfill Gravel for Manhole MH-D-08-02 -as Highlighted"
Inspection of Casting Reinforced Concrete for the Duct Bank of MV Line from B/MV/12 to B/MV/19 at Z
Inspection of Formwork for the Duct Bank of MV Line from B/MV/12 to B/MV/19 at Zone-B (As Highligh
Inspection of Steel Reinforcement for the Duct Bank of MV Line from B/MV/12 to B/MV/19 at Zone-B (A
Soil Preparation under Boulder No. RB- 240 prior to start cutting
"Inspection and Compaction Test for 7th Layer (7 of 8) Backfilling around SBC-08 (Stock Pile # 109 A-1-A
Inspection of Backfilling Sub Grade Above Gravel (2nd Layer out of 8) around the Manhole for FW-A-3-6
Inspection for application of Bituminous Damp Proofing (1st & 2nd Coat) on top of Primer for Foundatio
Inspection for application of Bituminous Damp Proofing (1st & 2nd Coat) on top of Primer for Foundatio
Inspection for application of Bituminous Damp Proofing (1st & 2nd Coat) on top of Primer for Foundatio
Inspection for application of Bituminous Damp Proofing (1st & 2nd Coat) on top of Primer for Foundatio
Inspection for application of Bituminous Damp Proofing (1st & 2nd Coat) on top of Primer for Foundati
Pipe Installation of Foul Water Line for (160mmØ- UPVC- Class 4) from (FW-A-3-14 to FW-A-3-17).
Bedding of Gravel 3/8" and Geotextile Surrounding Foul Water Line for (160mmØ- UPVC- Class 4) fr
Pipe Installation of Storm Water Line Outfall-G for (800mmØ-PP-Corrugated) from ( MH-G-03 to Outful
Bedding of Gravel 3/8" and Geotextile Surrounding Storm Water Line Outfall-G for (800mmØ-PP-Corru
Installation of straight UPVC conduit (Dia. 25mm) and Box for Security (CAM) at the Crescent-01 (Axis
Installation of straight UPVC conduit (Dia. 25mm) and Box for Voice and Data (CAM) at the Crescent-0
Installation of straight UPVC conduit (Dia. 25mm) and Box for Fire Alarm (Speaker) at the Crescent-01
Installation of straight UPVC conduit (Dia.32mm Socket Outlet) for Power at the Crescent -01 (Axis
Installation of straight UPVC conduit (Dia. 25mm) and Box for Fire Alarm (Speaker) at the Crescent-02
Geotextile sheet and 50mm thick Screed protection Under MCPE 2 Foundation (access to Tunnel 1) (as
Two layers of 4mm thick modified bituminous waterproofing membrane Under MCPE 2 Foundation (acces
Surface Preparation and Base Primer Coating Under MCPE 2 Foundation (access to Tunnel 1) (as Highli
Inspection & Compaction tests of Single Layer (Final) Backfilling (Sub-Base) (after 4 layers Sub gra
Coordinates & levels of Columns & Walls at Grid (A / 2-5 & 15-20) Inside Butterfly Garden, as highlig
Stack Boulders Installed 6th layer at Level +877.60, (Part 4) along Planted Bed 2 to 3 and above, Ins
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 5 layers and single layer
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 2 layers and single layer
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 6 layers) Surround the Ma
Inspection of 1st, 2nd & 3rd Layers of Gravel Backfilling Surround the Manhole (01 no's) (MH-D-04-01)
Check Levels after Excavation between Aviary & Geyser Garden, Inside Water Garden, at highlighted
Protection Layer 4mm thk Bituminous Protection Board for Foundation & wall of Seat walls "B, D, E &
Coordinates & Levels for Wall of Circular Wall (10) (Remaining part at Entrance wall) Half Part 2, ins
Concrete pouring & Shuttering for Wall of Circular Walls (10) (Remaining part at Entrance wall) Half P
Steel Reinforcement for Wall of Circular Wall (10) (Remaining part at Entrance wall) Half Part 2, insi
Coordinates & levels for Wall of Straight Wall (Left Side) at Entrance, inside Maze garden, as per high
Concrete pouring & Shuttering for Wall of Straight Wall (Left Side) at Entrance, inside Maze garden, a
Excavation for Car Park Tree Pit as Details D-38-1, as highlighted in the attached drawing
Excavation for Car Park Tree Pit as Details D-38-1, as highlighted in the attached drawing
Installation of Rock and Boulder No. RB-166 (Layer # 7 & 8)
Inspection and Compaction Test for 5th Layer (5 of 6) backfilling (grading) at Zone - K (Next to RB-334)
"Inspection and Compaction Test for Backfilling (10th Layer) for Storm Water Line from MH-D-01 to MH-D
"Inspection and Compaction Test for 6th Layer (6 of 8) Backfilling around SBC-08 (Stock Pile # 109 A-1-A
Soil Preparation prior to start Cutting and Backfill (-40cm from FGL) at Zone - K&L (Near Crusher) as high
Inspection And Compaction Test For Backfilling 4th Layer (4 of 14) For Foul Water Line From FW-A-3-6.
Inspection of Backfilling Sub Grade Above Gravel (1st Layer Out of 5) Around The Manhole for FW-A-3-
"Inspection of Backfilling Gravel (4th Layer Out of 5) around the Manhole for FW-A-3-6.8, FW-A-3-6.7,
"Inspection of Backfilling Gravel 3rd Layer (3 out of 3) around the Manhole for FW-A-3-6.9, FW-A-3-6
Inspection of Backfilling Sub grade above gravel (2nd Layer Out Of 3) around the Manhole for MH-D-0
Inspection of Backfilling Sub Grade Above Gravel (1St Layer out of 8) around the Manhole for FW-A-3-6
Inspection and compaction test 3rd layer for backfilling of PC and Stripfooting PC 34-36-38 Zone 1F (as h
Inspection and compaction test 3rd layer for backfilling of PC 28-30 Zone 1E (as highlighted) (3 of 4 lay
Level and Location for BUTTRESS BOI 52 (1st) (w/ beam) Zone 1N
Concreting for BUTTRESS BOI 52 (1st) (w/ beam) Zone 1N
Shuttering and Shear Connector for BUTTRESS BOI 52 (1st) (w/ beam) Zone 1N
Protection layer of 4mm thick bituminous protection board for Pilecaps 26, 28, 29, 30 Zone 1E
Installation of straight UPVC ducts (Dia. 3 inch) for Low Current (Telecom Communication TC) at Dis
Installation of straight UPVC ducts (Dia. 3 inch) for Low Current (Fire and Security FA & SEC) at Dis
Single Layer of 4mm thick Modified bituminous waterproofing membrane for Pilecaps 26, 28, 29, 30 Zo
Installation of straight UPVC ducts (Dia. 3 inch) for Power (Low Voltage LV & Emergency EM) at Disc
Concreting for BUTTRESS BIV 02 Zone 1A
Shuttering and Shear Connector for BUTTRESS BIV 02 Zone 1A
Concreting for BUTTRESS BOV 62, 63 BIV 62, 63 (1st) Zone 2A
Installation of Rock and Boulder No. RB-167 (11&12 Layers)
"Inspection of Grouting (Vertical Joints) for Rock Boulder - RB-063 for All Layers"
Installation of Rock and Boulder No. RB 266A - 1st Layer (1 of 4)
Installation of Rock and Boulder No. RB-139 (12 &13 Layers)
Installation of Rock and Boulder No. RB-167 (Top Layer)
Installation of Rock and Boulder No. RB-166 (Layer # 3,4,5,6,7)
Surface Preparation Prior to Start Backfill Gravel for Gullis G-E-08, G-E-09, G-E-10, G-E-11, G-E-12, G-E-
Sand Covering Layer for Protection of Telecommunications Line from (B/TL/21 to B/TL/42) at Zone-B as
Sand Covering Layer for Protection of Fire & Security Distribution Line from (B/FS/24 to B/FS/21) at Zo
Inspection for Sand Bedding under pipe for Telecommunication Line from F/TL/16 to F/TL/04 at Zone-F
Inspection for Sand Bedding under pipe for Fire & Security Distribution Line from F/FS/14 to F/FS/04 at
Soil Preparation under Boulder No. RB- 239 prior to start cutting
Inspection of Concrete Pouring for the Foundation and Kicker of Transition Area (As Highlighted)
"Inspection of Formwork for the Foundation and Kicker of Transition Area (As Highlighted)"
"Inspection of Steel Reinforcement for the Foundation and Walls of Transition Area (As Highlighted)"
Sand Covering Layer for Protection of Telecommunications Line from (B/TL/21 to B/TL/36) at Zone-B as
Sand Covering Layer for Protection of Fire & Security Distribution Line from (B/FS/24 to B/FS/36) at Zo
Excavation for Telecommunication Line from (G/TL/29 to H/TL/06) including pit G/TL/29 at Zone-G as hi
Excavation for Fire & Security Distribution Line from (G/FS/33 to H/FS/06) including Pit G/FS/33 at Zon
"Inspection and Compaction Test for 5th Layer (5 of 8) Backfilling around SBC-08 (Stock Pile # 109 A-1-A
"Inspection For Installation Of Slabs For (FW-A-13-5, FW-A-13-6, FW-A-13-7, FW-A-13-8) (As Highlighted
"Inspection For Installation Of All Rings (Riser) For FW-A-13-5, FW-A-13-6, FW-A-13-7, FW-A-13-8. (As H
"Inspection For Manhole Base Installation And UPVC Pipe Connection For FW-A-13-5, FW-A-13-6, FW-A-1
"Inspection For Installation Of Slabs For (MH-L-01, MH-L-02, MH-L-03, MH-L-04) (As Highlighted)."
"Inspection For Installation Of All Rings (Riser) For MH-L-01, MH-L-02, MH-L-03, MH-L-04. (As Highlight
"Inspection For Manhole Base Installation And UPVC Pipe Connection For MH-L-01, MH-L-02,MH-L-03, MH
Inspection And Compaction Test For Backfilling 1st Layer (1 of 9) For Foul Water Line From FW-A-3-7 T
Inspection And Compaction Test For Backfilling 1st Layer (1 of 9) For Storm Water Line From MH-K-07
INSPECTION FOR INSTALLATION OF ALL RINGS AND SLAB FOR - FW-A-3-8, FW-A-3-9, FW-A-3-10, FW-A-3-
INSPECTION FOR MANHOLE BASE INSTALLATION AND UPVC PIPE CONNECTION FOR - FW-A-3-12, FW-A-3-13
INSPECTION FOR MANHOLE BASE INSTALLATION AND UPVC PIPE CONNECTION FOR - MH-K-01. (As Highli
INSPECTION FOR INSTALLATION OF ALL RINGS AND SLAB FOR - MH-K-01 (As Highlighted)
INSPECTION FOR INSTALLATION OF ALL RINGS AND SLAB FOR - MH-K-04, MH-K-05, MH-K-06, MH-K-07 (As
Inspection for application of Base Primer (50%x50% Bitumin & Water) on Foundation and wall at Seating
Inspection for application of Base Primer (50%x50% Bitumin & Water) on Foundation and wall at Seating
Inspection for application of Base Primer (50%x50% Bitumin & Water) on Foundation and wall at Seating
Inspection for application of Base Primer (50%x50% Bitumin & Water) on Foundation and wall at Seating
Inspection for application of Base Primer (50%x50% Bitumin & Water) on Foundation and wall at Seating
Surface Preparation Prior to Backfilling Between Circular Walls and the Boundary wall from Elevation
Stack Boulders Installed 3rd layers (At level +876.250) at Right Side of Entrance of Mist Garden, At H
Stack Boulders Installed 1st & 2nd layers at Right Side of Entrance of Mist Garden, At Highlighted are
Inspection & Compaction tests of Single (Final) Layer (Sub-Base) Backfilling (Out of sub grade 3 lay
Stack Boulders Installed 1st layer at Step 1, at Right side of Geyser Garden, at Water Garden, At High
Stack Boulders Installed 3rd layer at Top, Left & Right Side of Mist Garden (Part 1 & 2), At Highlighte
1st Layer Gravel Backfilling Surround the Manholes (6 no's) (MH-D-09, MH-D-09-01, MH-D-09-02, MH-D
Concrete pouring for Encasement of Manhole (MH-D-01-A1-02-01,Type 'B' 1 no's) Inside Maze garden,
Stack Boulders Installed 2nd layer (upto Level +880.00) at Left side of Water Play Garden, (Part 6) At
Stack Boulders Installed Step layer upto level +877.50, Between Boat Garden and Boundary wall span (
Installation and Fixation of Anchor Bolts and Check Coordinates & Levels for Columns (C3A, C4A, C5A,
2nd Coat Damp proofing for footing & Kicker of Circular Wall (2, 3, 4, 5, 6, 7, 8, 9 & 10) Half Part 2,
Steel Reinforcement for Ring Beam & Remaining part of Wall @ Grid (2-14/Right Side) or Grid 3 to 13,
Inspection & Compaction tests of 4th Layer Backfilling (Sub-Grade) (Out of 4 layers)(From Bottom of B
Inspection & Compaction tests of 6th Layer Backfilling (Sub-Grade) (Out of 8 layers) along the Abutmen
Inspection & Compaction tests of 6th Layer Backfilling (Sub-Grade) (Out of 8 layers) along the Abutmen
Inspection & Compaction tests of 4th Layer Backfilling (Sub-Grade) (Out of 4 layers and single layer
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 2 layers and single laye
Inspection & Compaction Tests of Single Layer (Final) Sub Base Backfilling (after laying Sub Grade) S
Inspection & Compaction tests of Single Layer (Sub-Base) Backfilling (from level +873.55 to +874.30)
Inspection & Compaction Tests of Single Layer Sub Garde Backfilling (after laying Gravel) Surround th
Inspection of 1st & 2nd Layers of Gravel Backfilling Surround the Manhole (01 no's) (MH-C-7), (from B
Surface preparation prior to Backfilling Surround the Manhole (01 no's) (MH-C-7), (from Bottom of Bli
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 2 layers and single layer
Concreting for Strip footing Between PC 31, 33, 35, 37 Zone 1F
Concreting for BUTTRESS BII 97, 98 Zone 2J, 2K
Concreting for Mass Concrete at Zone 2J between PC 146-148 (3rd Layer)
Concreting for BUTTRESS BOI 93, 94, 95, 96 (with beam) Zone 2H 2J
Concreting for BUTTRESS BII 10, 11, 12, 13 (w/ beam) Zone 1C 1D
Shuttering and Shear Connector for BUTTRESS BII 12, 13 Zone 1C 1D
Concreting for Ground beam between PC 37-39-41-43 Zone 1G
Installation of straight UPVC conduit (Dia. 75mm - 2pcs) for TELECOM Duct Bank from Manhole no.
Installation and Survey Report for Location and Levels of Anchor Bolts for Front Canopy @ BUTTRESS BI
Installation of straight UPVC conduit (Dia. 75mm - 2pcs) for Fire and Security Duct Bank from Manh
Installation of straight UPVC conduit (Dia. 75mm - 2pcs) for Fire and Security Duct Bank from Man
Level and Location for MCPE 3 at Foundation Axis 02R to 02S (as Highlighted) Zone 2E 2F
Inspection and compaction test 2nd layer for backfilling of PC and Stripfooting PC 7-9-11 Zone 1B (as hi
Inspection and compaction test 2nd layer for backfilling of PC 28-30 Zone 1E (as highlighted) (2 of 4 lay
Steel Reinforcements for MCPE 2 WALL (OUTER ) at axis 03I to 02Z Zone 2G 2H (as highlighted)
Concreting for MCPE 3 at Foundation Axis 02R to 02S (as Highlighted) Zone 2E 2F
Shuttering for MCPE 3 at Foundation Axis 02R to 02S (as Highlighted) Zone 2E 2F
Steel Reinforcement for MCPE 3 at Foundation Axis 02R to 02S (as Highlighted) Zone 2E 2F
Protection layer of 4mm thick bituminous protection board for Tunnel 2 access shaft (axis 02-1 & 01-2)
2 layers of 4mm thick modified bituminous waterproofing membrane for Tunnel 2 access shaft (axis 02-
Steel Reinforcements for BUTTRESS BII 53 Zone 1N
Single layer 4mm thk Modified Bituminous Water Proofing Membrane for Foundation & wall of Seat wall
Installation and Fixation of Curved Steel Angle along the Ring Beam @ Grid (14-23/Left Side) Behind
Aluminium Flashing & Sealant for Waterproofing on Foundation of walls (Inner Side) of Whispering C
Gravel 3/8 Bedding & Geotextile Surround for Sub surface Drainage Branch lines (110mm Branch line
Excavation & Bed Preparation for Fire Alarm & Security Lines, Telecom Lines, Emergency Lines and Low
Surface preparation prior to Backfilling Surround the Manhole (01 no's) (MH-D-04-01) at Entrance of P
1st Coat Damp proofing for footing & Kicker of Circular Wall (2, 3, 4, 5, 6, 7, 8, 9 & 10) Half Part 2, (
Primer Coating Prior to Damp proofing for footing & Kicker of Circular Wall (2, 3, 4, 5, 6, 7, 8, 9 & 10)
Excavation for Planter Boxs, between boulders at Bottom side of Planted bed 1, at Water Garden, at
Inspection & Compaction tests of 4th Layer Backfilling (Sub-Grade) (Out of 4 layers and single layer
Inspection for Sand Bedding under pipe for Fire & Security Distribution Line from B/FS/27 to G/FS/10 at
Inspection for Sand Bedding under pipe for Telecommunication Line from B/TL/35 to G/TL/30 at Zone-G
Inspection of Backfilling Sub grade above gravel (1st Layer Out Of 3) around the Manhole for MH-D-02
Inspection And Compaction Test For Backfilling 2nd Layer (2 of 14) For Foul Water Line From FW-A-3-6.
Inspection And Compaction Test For Backfilling 3rd Layer (3 of 14) For Foul Water Line From FW-A-3-6.
Inspection and Compaction Test for 1st Layer (1 of 3) backfilling (grading) at Zone - K (Near RB-333) as h
"Inspection of Backfilling Gravel (3rd Layer Out of 5) around the Manhole for FW-A-3-6.8, FW-A-3-6.7
"Inspection of Backfilling Gravel 2nd Layer (2 out of 3) around the Manhole for FW-A-3-6.9, FW-A-3-6
"Surface Preparation Prior to Start Backfilling Gravel For Manhole MH-K-02, MH-K-03, MH-K-04 - AS Hi
Level and Location for MCPE 2 WALL (OUTER ) at axis 02AH to 02AG Zone 2K (as highlighted)
"Surface Preparation Prior to Start Backfilling Gravel For Manhole FW-A-3-11, FW-A-3-12, FW-A-3-13
Inspection of Backfilling Gravel (1ST & 2ND & 3RD Layer Out Of 3) around the Manhole for MH-D-02 as
Level and Location for Strip Footing between PC 193-195 Zone 2R
Inspection of Backfilling Gravel (1ST & 2ND & 3RD Layer Out Of 6) around the Manhole for MH-D-01 as
Level and Location for 2nd layer Mass Concrete for Stip footing between PC 140-142-144-146 Zone 2H
Concreting for MCPE 2 WALL (OUTER ) at axis 02AH to 02AG Zone 2K (as highlighted)
"Inspection and Compaction Test for 4th Layer (4 of 8) Backfilling around SBC-08 (Stock Pile # 109 A-1-A
Inspection and Compaction Test for 4th Layer (4 of 6) backfilling (grading) at Zone - K (Next to RB-334)
Inspection of Backfilling Sub-grade 6th Layer (6 of 6) around the Manhole (above gravel) for MH-D-06 -
Shuttering for MCPE 2 WALL (OUTER ) at axis 02AH to 02AG Zone 2K (as highlighted)
Concreting for Strip Footing between PC 193-195 Zone 2R
Geotextile sheet and Screed protection below Strip Footing between PC 193-195 Zone 2R
Shuttering for Strip Footing between PC 193-195 Zone 2R
Steel Reinforcements for Strip Footing between PC 193-195 Zone 2R
Concreting of 2nd layer Mass Concrete for Stip footing between PC 140-142-144-146 Zone 2H
Shuttering of 2nd layer Mass Concrete for Stip footing between PC 140-142-144-146 Zone 2H
Anti Termite application under Mass Concrete for Stip footing between PC 140-142-144-146 (2ND) Zone
Concreting for BUTTRESS BOV 77, 78, 79, 80, 81 Zone 2E
Pipe Installation of Sub-Surface Drainage (Main Line & Branches) Pipes; (110mmØ, 160mmØ & 250m
Installation of straight UPVC conduit (Dia. 110mm - 2pcs) for Fire and Security Duct Bank no.BB/D-FS/
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 2 layers and single layer
Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Grade) (Out of 4 layers)(From Bottom of B
Inspection & Compaction Tests of Single Layer Sub Base Backfilling (after laying sub grade) Surround
Inspection & Compaction Tests of Single Layer Sub Garde Backfilling (after laying Gravel) Surround th
Excavation for Tree Pits (26 no's) at surround the Geyser Garden Inside Water Garden, at highlighted
Marking & Check for coordinates of Tree Pits (5 no's) at Left side of Planted bed 3, Inside Water Play
Aluminium Falshing & Sealant for Waterproofing on Foundation of walls (Inner Side) of Whispering C
Slated Layer 4mm thk Modified Bituminous Waterproofing membrane for Foundation of walls (Inner Si
Protection Layer 4mm thk Bituminous Protection Board for Foundation of walls (Inner Side) of Whisp
Slated Layer 4mm thk Modified Bituminous Waterproofing membrane for Foundation of walls (Inner Si
Surface preparation prior to Waterproofing and Application of Primer coating, 1st & 2nd Coats of Da
Inspection & Compaction tests of 7th Layer Backfilling (Sub-Grade) along the Boundary wall (Inner Side
Steel Reinforcement for Wall of Straight Wall (Left Side) at Entrance, inside Maze garden, as per high
Inspection & Compaction Tests of Single (Final) Layer Sub Base Backfilling (Start from Bottom of Bli
Surface preparation prior to Waterproofing and Application of Primer coating, 1st & 2nd Coats of D
Inspection & Compaction Tests of Single Layer Sub Base Backfilling (after laying sub grade) Surround
Inspection & Compaction Tests of Single Layer Sub Base Backfilling (after laying sub grade) Surround
Inspection & Compaction Tests of Single Layer Sub Garde Backfilling (after laying Gravel) Surround t
Stack Boulders Installed 2nd layer at Step 3, upto level +876.25, Right side of Geyser Garden, at Wat
Stack Boulders Installed 2nd layer at Step 2, upto level +875.85, Right side of Geyser Garden, at Wat
Installation of earthing clamps with conductor 70mm (2pcs.) for earthing reinforcement steel re-bar at
Installation of straight UPVC conduit (Dia. 25mm) and Box for Fire Alarm (Speaker) at the Crescent-02
Installation of straight UPVC Conduit (Dia. 4inch.) for Fire and Security Duct Bank no.BB/D-FS/2
Installation of straight UPVC Conduit (Dia. 4inch.) for TELECOM Duct Bank no.BB/D-TL/34 (4x110mm
Concreting for Mass Concrete for Stip footing between PC 127-129 Zone 2F
Shuttering for Mass Concrete for Stip footing between PC 127-129 Zone 2F
"Inspection of Grouting (Vertical Joints) for Rock Boulder - RB-069 for All Layers"
Anti Termite application under Mass Concrete for Stip footing between PC 127-129 Zone 2F
"Inspection of Grouting (Horizontal Joints) for Rock Boulder - RB-069 for All Layers"
"Inspection of Grouting (Horizontal Joints) for Rock Boulder - RB-265 for All Layers"
Shuttering for Internal Building Mass Concrete Zone 1P (as Highlighted)
Soil Preparation prior to start Backfill (-40cm from FGL) at Zone - K (Near Tower-3) as highlighted
Excavation for Storm Water Line from MH-G-03 to MH-G-06 including Branches, Manhole MH-G-04, MH-
Inspection and compaction test 1st layer for backfilling of PC 28-30 Zone 1E (as highlighted) (1 of 4 laye
"Inspection for Casting the Blinding Concrete under the Manhole FW-A-13-1, FW-A-13-2, FW-A-13-3, FW
"Inspection and Compaction Test for Backfilling (9th Layer) for Storm Water Line from MH-D-01 to MH-D-
Excavation for Fire & Security Distribution Line from (F/FS/14 to F/FS/17) including branch and Pit F/F
Excavation for Telecommunication Line from (F/TL/16 to F/TL/12) including branch and pit F/TL/16, F/T
"Inspection and Compaction Test for 3rd Layer (3 of 8) Backfilling around SBC-08 (Stock Pile # 109 A-1-A
Level and Location for BUTTRESS BOV 62 63 (1st) Zone 2A
"Inpection of Casting Concrete for Short Piece & Surface Preperation prior to start waterproofing and
Surface Preparation Prior to Start Backfill Gravel for Manhole - FW-A-3-7 - AS Highlighted
"Inspection of Backfilling Gravel 1st Layer (1 out of 3) around the Manhole for FW-A-3-6.9, FW-A-3-6.
Inspection And Compaction Test For Backfilling 2nd Layer (2 of 19) For Foul Water Line From FW-A-3-6.
Level and Location for BUTTRESS BOV 77, 78, 79, 80, 81 Zone 2E
Inspection And Compaction Test For Backfilling 1st Layer (1 of 19) For Foul Water Line From FW-A-3-6.
Inspection And Compaction Test For Backfilling 1st Layer (1 of 14) For Foul Water Line From FW-A-3-6.
Level and Location for Mass Concrete for Stip footing between PC 127-129 Zone 2F
Level and Location for Internal Building Mass Concrete Zone 1P (as Highlighted)
Installation of straight UPVC conduit (Dia.32mm Socket Outlet) for Power at the Crescent -02 (Axis 02/
Installation of straight UPVC conduit (Dia.6 inch.) Medium Voltage Duct Bank (4x160mm) at the Car
Installation of straight UPVC conduit (Dia. 25mm) and Box for Voice and Data (WIFI ) at the Crescent-0
Stone Cladding for Circular wall (10) Half part 1 (Outer Side), Inside Maze garden, as highlighted area
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 4 layers)(From Bottom of B
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 4 layers)(From Bottom of B
Inspection & Compaction Tests of Single Layer Sub Base Backfilling (after laying sub grade) Surround
Excavation & Soil Preparation for Stack Boulders, Left side of Planted Bed # 3, Inside Water Play Gard
Excavation & Bed Preparation for Electrical Lines (400mm trench for Sub main cables of Power Contai
Surface preparation prior to Stone Cladding for walls (All Sides) of 2 Curved Walls, at Entrance, at Ma
1st Coat Cementitious Waterproofing for footing & Kicker of 2 Curved Walls, (Inner & Outer Sides) at
Surface preparation prior to Waterproofing for Foundation of Plant room (Inner & Outer Sides), at Di
Aluminium Flashing & Sealant for water proofing on Foundation & Kicker of Walls (Outer Face) of Oute
Stone Cladding for Boundary wall at Elevation "F" (Outer Face) and Whispering Cave 1 (Outer sides)
Excavation & Soil Preparation for Stack Boulders, Bottom side of Geyser Garden, at highlighted area
Excavation & Bed Preparation for Electrical Lines (400mm trench for Sub main cables), passing under
Marking & Check for coordinates of Tree Pits (3 no's) Between Geyser of Water Play Garden, at highl
Inspection & Compaction Tests of Single Layer Sub Garde Backfilling (after laying Gravel) Surround th
Inspection for Installed Rings (Risers) and Top Slab for Manholes (14 no's) (MH-D-03-02, MH-D
Inspection for Installed Rings (Risers) and Top Slab for Manholes (6 no's) (MH-D-09, MH-D-09-01, M
Inspection for Installed Rings (Risers) and Top Slab for Manholes (4 No's)(MH-D-01-B3, MH-D-01-B3-
"Inspection of Grouting (Vertical Joints) for Rock Boulder - RB-265 for All Layers"
"Inspection of Grouting (Horizontal Joints) for Rock Boulder - RB-324 for All Layers"
"Inspection of Grouting (Vertical Joints) for Rock Boulder - RB-324 for All Layers"
"Inspection of Grouting (Vertical Joints) for Rock Boulder - RB-060 for All Layers"
"Inspection of Grouting (Horizontal Joints) for Rock Boulder - RB-153 for All Layers"
"Inspection of Grouting (Vertical Joints) for Rock Boulder - RB-153 for All Layers"
Excavation for Fire & Security Distribution Line from (B/FS/27 to G/FS/10) including Pit G/FS/17, G/FS/
Excavation for Storm Water Line from MH-A-11 to Water Tank - As highlighted
Excavation for Storm Water Line from MH-A-12 to Water Tank - As highlighted
Excavation for Foul Water Line from FW-A-13 to FW-A-13-4 including Manhole FW-A-13-1, FW-A-13-2, F
"Inspection for Casting the Blinding Concrete under the Manhole FW-A-13-5, FW-A-13-6, FW-A-13-7, FW
"Inspection for Casting Blinding Concrete under Manhole MH-L-01, MH-L-02, MH-L-03, MH-L-04 - as hig
Excavation for Telecommunication Line from (B/TL/35 to G/TL/30) including pit G/TL/32, G/TL/30 at Zon
"Inspection and Compaction Test for 2nd Layer (2 of 8) Backfilling around SBC-08 (Stock Pile # 109 A-1-A
Inspection for Sand Bedding under pipe for Fire & Security Distribution Line from K/FS/01 to G/FS/52 a
Inspection for Sand Bedding under pipe for Telecommunication Line from K/TL/01 to G/TL/54 at Zone-G
Inspection for Sand Bedding under pipe for Fire & Security Distribution Line from G/TL/50 to G/TL/43 a
Inspection for Sand Bedding under pipe for Telecommunication Line from G/TL/50 to G/TL/43 at Zone-G
"Inpection of Casting Concrete for Short Piece & Surface Preperation prior to start waterproofing
Inspection And Compaction Test For Backfilling 2nd Layer (2 of 14) For Foul Water Line From FW-A-3-6.
Level and Location for BUTTRESS BIV 77, 78, 79, 80, 81 Zone 2E
Steel Reinforcements for BUTTRESS BOI BOV BII BIV 20, 21 Zone 1 E 1F
Concreting for BUTTRESS BIV 77, 78, 79, 80, 81 Zone 2E
Shuttering and Shear Connector for BUTTRESS BIV 77, 78, 79, 80, 81 Zone 2E
Installation of straight UPVC ducts (Dia. 3 inch, 2x75mm) for Fire and Security from MH/WG/FA/9 t
Warning Tape Installation of Potable Water Networks for (200mmØ-UPVC-Class-5). As per highlighted
Pipes Sand Cover and Protection of Potable Water Networks for (200mmØ-UPVC-Class-5). As per high
Warning Tape Installation of Potable Water Networks for (200mmØ-UPVC-Class-5). As per highlighted
Pipes Sand Cover and Protection of Potable Water Networks for (200mmØ-UPVC-Class-5). As per high
300 mm Gravel 3/8" Backfilling and Geotextile for Foul Water Line (150mmØ-UPVC- CLASS 4) from (M
Pipe Installation of Foul Water Line for (160mmØ & 110mmØ - UPVC- Class 4) from (FW-A-23 to FW-
Bedding of Gravel 3/8" and Geotextile Surrounding Foul Water Line for (160mmØ & 110mmØ - UPVC-
Installation of straight UPVC ducts (Dia. 3 inch, 2x75 mm ) for Power Between MH/WG/EM/09 to
Inspection & Compaction Tests of Single Layer Sub Garde Backfilling (Start from Bottom of Blinding)
Stack Boulders Installed miscellaneous small layers (upto Levels +876.25, 876.05) at Right side, Bet
Stack Boulders Installed miscellaneous small layers (at different Levels) Near Existing Boulders at Lef
Concrete pouring for Pipe Encasements of Manhole (01 no's) (MH-D-04-01) at Entrance of Physic garde
Stone Coping on Boundary wall (after Stone Cladding for walls) @ Span 46, 48 & 49 of Water Garden,
Inspection & Compaction tests of 6th Layer Backfilling (Sub-Grade) along the Boundary walls (Inner Sid
Slated Layer 4mm thk Modified Bituminous Waterproofing membrane for Waterproofing of Foundation &
Protection Layer 4mm thk Bituminous Protection Board for Waterproofing of Foundation & Kicker of Wa
Grouting for Stone Cladding of Boundary wall (Inner & Outer Sides) at Span 71, 72 & 73 and Column's
Inspection and compaction test 4th layer for backfilling of PC and Stripfooting PC 34-36-38-40-42-44 Zo
Inspection and compaction test 3rd layer for backfilling of PC and Stripfooting PC 105-107-109 Zone 2C (
Excavation for the loose Exsisting NGL in MCPE 4 Zone 1N (as highlighted)
Level and Location for BUTTRESS BII 12, 13 (w/ beam) Zone 1C 1D
Excavation for Car Park Tree Pit as Details D-38-1, as highlighted in the attached drawing
Installation of Rock and Boulder No. RB 069 (5th layer) (5 of 5)
Inspection for Rough Grading (Cut & Fill) upto (-40cm) from the Final Grading Level - as Highlighted
Inspection and Compaction Test for 3rd Layer (3 of 3) backfilling (grading) at Zone - K as highlighted
"Inspection and Compaction Test for 1st Layer (1 of 8) Backfilling around SBC-08 (Stock Pile # 109 A-1-A
"Inspection and Compaction Test for Backfilling (8th Layer) for Storm Water Line from MH-D-01-B1 to MH
Inspection and Compaction Test for 3rd Layer (3 of 6) backfilling (grading) at Zone - K (Next to RB-334) a
Inspection And Compaction Test For Backfilling 1st Layer (1 of 14) For Foul Water Line From FW-A-3-6.
"Inspection of Backfilling Gravel (1st Layer) around the Manhole for FW-A-3-6.8, FW-A-3-6.7, FW-A-3-
Notification to start backfilling for the existing trench from stage 2 excavation (the level and location
Excavation for Storm Water Line from MH-M-15 to MH-M-12 including Manhole MH-M-15, MH-M-14, M
INSPECTION FOR INSTALLATION OF GULLIES, PIPE CONNECTION AND CONCRETE FOR SHORT PIECES FOR -G
Geotextile sheet and Screed under Strip Footing Between PC 83-85-87, 84-86-88 Zone 1P
Inspection for the Installation of Gullis and pipe connection for G-A-23, G-A-24, G-A-25, G-A-26, G-X-07,
"INSPECTION FOR INSTALLATION OF GULLIES AND PIPE CONNECTION FOR G-A-10, G-A-11 (As Highlighte
Single layer of 4mm thick modified bituminous waterproofing under Strip Footing Between PC 83-85-87
Surface Preparation and Solvent Base Primer under Strip Footing Between PC 83-85-87, 84-86-88 Zone
Surface Preparation and solvent base primer for Outer MCPE 3 wall axis 03-2, 03A to 02R (as highlighted
Surface Preparation and solvent base primer for Tunnel 2 access shaft (axis 02-1) Zone 2F (as Highlighte
Concreting for BUTTRESS BOV 52 & 53 (1st) Zone 1N
Concreting for BUTTRESS BII 07 (2nd) Zone 1B
Concreting for Mass Concrete at Zone 2J between PC 146-148, 150-152 (2nd Layer)
Steel Reinforcement for BUTTRESS BIV BII 78, 79, 80, 81 Zone 2E 2F
Concreting for BUTTRESS BIV 97, 98 Zone 2J 2K
Existing Level Natural Grade Line for MCPE 4 Zone 1
Geotextile and Screed under Strip footing between PC 31-33-35-37-39-41-43 Zone 1F 1G
Inspection and compaction test 3rd layer for backfilling of PC and Stripfooting PC 34-36-38-40-42-44 Zo
Inspection and compaction test 2nd layer for backfilling of PC and Stripfooting PC 105-107-109 Zone 2C
Surface Preparation Prior to start Backfilling around Pilecap 28 - 30 as highlighted Zone 1E (as highlight
Inspection for Installed Rings (Risers) and Slab for Manholes (16 no's: MH-C-1, MH-C-2, MH-C-3,
Inspection of 1st & 2nd Layers of Gravel Backfilling Surround the Manhole (1 no's: MH-C-4), Inside W
Inspection of 1st, 2nd & 3rd Layers of Gravel Backfilling Surround the Manhole (1 no's: MH-C-1-4), In
Surface preparation prior to Backfilling Surround the Manhole (1 no's: MH-C-4), Inside Water Garden,
Surface preparation prior to Backfilling Surround the Manhole (1 no's: MH-C-1-4), Inside Water Garde
Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Grade) (Out of 4 layers and single layer
Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Grade) (Out of 3 layers and single layer
Inspection & Compaction tests of 5th Layer Backfilling (Sub-Grade) (Out of 8 layers) along the Abutmen
Inspection & Compaction tests of 5th Layer Backfilling (Sub-Grade) (Out of 8 layers) along the Abutmen
Inspection & Compaction tests of 5th Layer Backfilling (Sub-Grade) along the Boundary walls (Inner Sid
Solvent Base Primer Coating prior to Membrane Waterproofing for Foundation & wall of Seat walls "B,
Inspection & Compaction tests of 4th Layer Backfilling (Sub-Grade) along the Boundary walls (Inner Sid
8 Layers of Block work (Upto Lintel Bottom) at Whispering Cave 1 & 2, @ Sound & Light Garden, At hi
Inspection & Compaction Tests of Single Layer Sub Garde Backfilling (Start from Bottom of Blinding) Be
Surface preparation Prior to Backfilling (From Bottom of Blinding level upto Bottom of Finish Floor leve
Protection Layer 4mm thk Bituminous Protection Board for Waterproofing of footing & Kicker of Circula
Slated Layer 4mm thk Modified Bituminous Waterproofing membrane for Waterproofing of Foundation &
Protection Layer 4mm thk Bituminous Protection Board for Waterproofing of Foundation & Kicker (Inne
Installation of Rock and Boulder No. RB 069 (4th layer) (4 of 5)
"Surface Preparation Prior to Start Backfill Gravel for Manhole - FW-A-3-8, FW-A-3-9, FW-A-3-10 - AS H
"Surface Preparation Prior to Start Backfill Gravel for Manhole - MH-K-05, MH-K-06, MH-K-07 - AS Highl
"INSPECTION FOR INSTALLATION OF ALL RINGS (RISER) AND SLAB FOR MH-K-02, MH-K-03 (As Highlighted
INSPECTION FOR MANHOLE BASE INSTALLATION AND UPVC PIPE CONNECTION FOR - MH-K-02, MH-K-03 .
Soil Preparation prior to start backfill around SBC-08 at Zone - 4B - as highlighted
Excavation for Storm Water Line from Outfall L to MH-L-04 including Manhole MH-L-01, MH-L-02, MH-L-
"Inspection and Compaction Test for Backfilling (8th Layer) for Storm Water Line from MH-D-01 to MH-D-
INSPECTION FOR INSTALLATION OF SLABS FOR (FW-A-3-7) (As Highlighted).
INSPECTION FOR INSTALLATION OF SLABS FOR (FW6-1) - As Highlighted
INSPECTION FOR INSTALLATION OF SLABS FOR (FW1, FW1-1) - As Highlighted
"INSPECTION FOR INSTALLATION OF ALL RINGS (RISER) AND SLAB FOR FW-A-3-6.1 (As Highlighted) "
INSPECTION FOR MANHOLE BASE INSTALLATION AND UPVC PIPE CONNECTION FOR - FW-A-3-6.1 . (As Hig
"INSPECTION FOR INSTALLATION OF RINGS UP TO BOTTOM OF SLAB FOR (FW-A-3-6.11, FW-A-3-6.12) - A
Pipe Installation of Storm Water Line Outfall-G for (400mmØ, 450mmØ-UPVC- Class 4) from ( MH-G-01
Bedding of Gravel 3/8" and Geotextile Surrounding Storm Water Line Outfall-G for (400mmØ, 450mm
Warning Tape Installation for Foul Water Line for (160mmØ & 250mmØ - UPVC- Class 4) from (FW-A-3
300 mm Gravel 3/8" Backfilling and Geotextile of Foul Water Line for (160mmØ & 250mmØ - UPVC- C
Warning Tape Installation for Storm Water Line Outfall-K for (600mmØ & 800mmØ -PP-Corrugated) f
300 mm Gravel 3/8" Backfilling and Geotextile of Storm Water Line Outfall-K for (600mmØ & 800mm
Pipe Installation of Sub-Surface Drainage (Main Line & Branches) Pipes; (110mmØ, 160mmØ & 250m
"Inspection of Grouting (Vertical Joints) for Rock Boulder - RB-61 for All Layers"
Installation of Rock and Boulder No. RB 069 (3rd layer) (3 of 5)
"INSPECTION FOR INSTALLATION OF GULLIES AND PIPE CONNECTION FOR - G-E-08, G-E-09, G-E-10, G-E-11,
Excavation for Fire & Security Distribution Line from (K/FS/01 to G/FS/52) including Pit K/FS/01, G/FS/
Excavation for Telecommunication Line from (K/TL/01 to G/TL/54) including pit K/TL/01, G/TL/54 at Zon
Excavation for Foul Water Line from FW-A-13-5 to FW-A-13-8 including Manhole FW-A-13-5, FW-A-13-6,
Excavation for Storm Water Line from MH-G-01 to G-G-72 including Branches, Manhole MH-G-01, MH
Inpection of Casting Concrete for Short Piece & Surface Preperation prior to start waterproofing and
Inpection of Casting Concrete for Short Piece & Surface Preperation prior to start waterproofing and A
"Surface Preparation Prior to Start Backfill Gravel for Manhole - FW-A-3-6.12, FW-A-3-6.11, FW-A-3-6
Excavation for MV Line FROM G/MV/12 TO K/MV/02 includign Pit G/MV/12, G/MV/13, K/MV/01, K/MV/0
Excavation for Fire & Security Distribution Line from (G/TL/50 to G/TL/43) including Pit G/FS/08, G/FS/
Excavation for Telecommunication Line from (G/TL/50 to G/TL/43) including pit G/TL/54, G/TL/44, G/TL
Inspection for Sand Bedding under pipe for Telecommunications Line from G/TL/50 TO G/TL/54 at Zone-G
Inspection for Sand Bedding under pipe for Fire & Security Line from B/FS/21 TO B/FS/36 at Zone-B as h
Inspection for Sand Bedding under pipe for Telecommunications Line from B/TL/36 TO B/TL/42 at Zone-B
"Inspection and Compaction Test for 14th Layer (14 of 14) Backfilling around SBC-09 (Stock Pile # 109 A
"Inspection and Compaction Test for 13th Layer (13 of 14) Backfilling around SBC-09 (Stock Pile # 109 A
"Inspection and Compaction Test for Backfilling (7th Layer) for Storm Water Line from MH-D-01-B1 to MH
Inspection and Compaction Test for 2nd Layer (2 of 6) backfilling (grading) at Zone - K (Next to RB-334)
Inspection and Compaction Test for 2nd Layer (2 of 3) backfilling (grading) at Zone - K as highlighted
"Inspection for Backfilling Sub-base under Boulder no. RB-266B (Stock Pile # 109 A-1-A) "
Inpection of Casting Concrete for Short Piece & Surface Preperation prior to start waterproofing and A
Installation of straight UPVC ducts (Dia 6 inch) Mediam Voltage Duct bank 5X160MM BETWEEN MA
Gravel 3/8 Bedding & Geotextile Surround for Sub surface Drainage lines (250mm Main line from MH-C
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 2 layers and single layer
Concrete pouring for Encasement of Pipes for Manholes (2 no's: MH-C-3-1 & MH-C-7), Inside Water Ga
Inspection of 1st, 2nd & 3rd Layers of Gravel Backfilling Surround the Manhole (1 no's: MH-C-4-1), In
Inspection of 4th Layer of Gravel Backfilling Surround the Manholes (2 no's: MH-C-2, MH-C-3), Inside
Inspection & Compaction Tests of Single Layer Sub Garde Backfilling (after laying Gravel) Surround t
Inspection & Compaction Tests of Single Layer Sub Base Backfilling (after laying Sub Grade) Surround
Sand Bedding for Low voltage Lines, Telecom lines, Emergency Lines and Fire Alarm & Security Lines,
Stack Boulders Installed 2nd layer (upto Level +876.60) at Top & Right Side of Mist Garden (Part 2), A
Stack Boulders Installed Step layer (upto Level +876.25) at Right side, Between Geyser & Mist Garden
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 3 layers and single layer
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 4 layers and single layer
Inspection & Compaction tests of Sigle Layer Backfilling (Sub-Base) (from level +874.15 to +874.90)
Soil Preparation prior to Backfilling (From Bottom of Blinding level upto Bottom of Mulch level) along
Inspection of Internal Plastering for walls Inside Change room (GF-5085), Custody off (GF-5086), DE
Inspection of Applied Wall Putty for External wall elevations Prior to Apply Paint for Ticket booths # 1
Installation of straight UPVC conduit (Dia.160mm & 75mm) for Submain Cables (Bet. MH/WG/31 &
Level and Location for BUTTRESS BOV 52 & 53 (1st) Zone 1N
Level and Location for BUTTRESS BIV 02 Zone 1A
Level and Location for BUTTRESS BOV 62, 63 BIV 62, 63 Zone 2A
Inspection and compaction test 1st layer for backfilling of PC and Stripfooting PC 105-107-109 Zone 2C (
Inspection and compaction test 2nd layer for backfilling of PC and Stripfooting PC 34-36-38-40-42-44 Zo
Concreting of 1st layer Mass Concrete for Stip footing between PC 140-142-144 Zone 2H
Concreting of 1st layer Mass Concrete for Stip footing between PC 22-24-26 Zone 1D
Concreting for BUTTRESS BIV 02 Zone 1A
Shuttering and Shear Connector for BUTTRESS BIV 02 Zone 1A
Concreting for BUTTRESS BOV 62, 63 BIV 62, 63 Zone 2A
Shuttering and Shear Connector for BUTTRESS BOV 62, 63 BIV 62, 63 Zone 2A
Shuttering for Mass Concrete at Zone 2J between PC 146-148, 150-152 (2nd Layer)
Excavation & Soil Preparation for Stack Boulders at Right Side of Entrance of Mist Garden, at highligh
Surface preparation prior to Backfilling Surround the Manhole (1 no's: MH-C-4-1), Inside Water Garde
Inspection of 3rd Layer of Gravel Backfilling Surround the Manholes (5 no's: MH-C-2, MH-C-3, MH-C-
Inspection & Compaction Tests of Single Layer Sub Garde Backfilling (after laying Gravel) Surround t
Inspection of Spatter Dash (Rough Coat) for External Walls at Grid (19-20/Q) & (19/Q-T) at Managemen
Surface preparation prior to Stone Cladding for walls (Inner & Outer Sides) of Circular Walls (2, 3, 4,
Surface preparation Prior to Backfilling (From Bottom of Blinding level upto Bottom of Finish Floor leve
Protection Layer 4mm thk Bituminous Protection Board for Waterproofing of footing & Kicker of Circula
Inspection & Compaction tests of 5th Layer Backfilling (Sub-Grade) (Out of 6 layers) along the Boundar
Single layer 4mm thk Modified Bituminous Water Proofing Membrane for Foundation & Kicker of Walls
Stack Boulders Installed 5th layer at Level +877.10, (Part 4) along Planted Bed 2 to 3 and above, Ins
Stack Boulders Installed 2nd layer at Top & Left Side of Mist Garden, (Part 1) At Highlighted area in
Installation of Rock and Boulder No. RB-265 3rd layer (3 of 3)
Installation of Rock and Boulder No. RB-265 2nd layer (2 of 3)
inspection for Sand bedding under pipe for Fire & Security Distribution Line from (G/FS/52 to G/TL/50)
Surface Preparation for Foul Water Line from FW-A-3.7 to FW-A-3.17, prior to start back filling (as Highl
Surface Preparation for Storm Water Line from MH-K-07 to MH-K-01, prior to start back filling (as Highli
Level and Location for 1st layer Mass Concrete for Stip footing between PC 140-142-144 Zone 2H
Shuttering of 1st layer Mass Concrete for Stip footing between PC 140-142-144 Zone 2H
Anti termite application under 1st layer mass concrete for strip footing between PC 140-142-144 Zo
Steel Reinforcements for BUTTRESS BOI BOV BII BIV 59 Zone 2A
Concreting for BUTTRESS BIV 52 & 53 (1st) Zone 1N
Marking & Check for coordinates of Tree Pits (5 no's) Inside Circular walls at Maze Garden, at highlig
Excavation & Bed Preparation for Sub surface Drainage lines (250mm Main line from MH-C-1 End) & (
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 4 layers and single layer
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 3 layers and single layer
Inspection of 1st & 2nd Layers of Gravel Backfilling Surround the Manholes (8 no's: MH-C-2, MH-C-
Surface preparation prior to Backfilling Surround the Manholes (8 no's: MH-C-2, MH-C-3, MH-C-5, M
Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Grade) along the Boundary walls (Inner Sid
Stone Coping on Boundary wall (after Stone Cladding for walls) @ Span 3, 4 & 5 of Water Garden, at
Stone Cladding for Walls (Outer Face) of Outer Canopy 3, at Outside of Physic Garden, at highlighted
Surface Preparation prior to Waterproofing for Foundation & wall of Seat walls "B, D, E & F" (All Sid
Inspection of Spatter Dash (Rough Coat) for walls Inside Change room (GF-5085), Custody off (GF-50
Sealant filling for New Conctrol Joints (01no's) on Parapet wall (External Side) at Grid (19/Q-T) at M
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 2 layers and single layer
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 2 layers and single layer
Concreting for MCPE 1 WALL (OUTER) at axis 03S to 03R Zone 2N 2M (as highlighted)
Shuttering for MCPE 1 WALL (OUTER) at axis 03S to 03R Zone 2N 2M (as highlighted)
Shuttering of 1st layer Mass Concrete for Stip footing between PC 22-24-26 Zone 1D
Anti Termite application under 1st layer Mass Concrete for Stip footing between PC 22-24-26 Zone 1D
Steel Reinforcements for MCPE 2 WALL (OUTER) at axis 02AB to 02AD Zone 2G 2H (as highlighted)
Concreting for BUTTRESS BOI 68 (2nd) Zone 2C
Shuttering and Shear Connector for BUTTRESS BOI 68 (2nd) Zone 2C
Concreting for Foundation of MCPE 2 Axis 02X TO 03E (As highlighted)
Shuttering for Foundation of MCPE 2 Axis 02X TO 03E (As highlighted)
Steel Reinforcements for Foundation of MCPE 2 Axis 02X TO 03E (As highlighted)
Concreting for Ground beam between PC 37-39-41-43 Zone 1G
Shuttering for Ground beam between PC 37-39-41-43 Zone 1G
Installation of straight UPVC ducts (Dia. 3 inch) for Power 2x75 mm Between MH/WG/LV/13 to M
Steel Reinforcements for Ground beam between PC 37-39-41-43 Zone 1G
Concreting of MCPE 3 Wall at Axis 02R to 02Q (as highlighted) Zone 2E
Shuttering of MCPE 3 Wall at Axis 02R to 02Q (as highlighted) Zone 2E
Concreting For MCPE 1 Wall Axis 03-2, 02AP to 03T (as Highlighted) Zone 2N 2M
Installation of straight UPVC conduit (Dia. 25mm) and Box for Voice and Data (WIFI ) at the Crescent-02
Installation of straight UPVC conduit (Dia. 25mm) and Box for Fire Alarm (Speaker) at the Crescent-02 (
Shuttering For MCPE 1 Wall Axis 03-2, 02AP to 03T (as Highlighted) Zone 2N 2M
Installation of straight UPVC conduit (Dia.32mm Socket Outlet) for Power at the Crescent -02 (Axis 02
Installation of earthing clamps with conductor 70mm (2pcs.) for earthing reinforcement steel re-bar at
Level and Location for MCPE 1 WALL (OUTER) at axis 03S to 03R Zone 2N 2M (as highlighted)
Level and Location for 1st layer Mass Concrete for Stip footing between PC 22-24-26 Zone 1D
Level and Location for BUTTRESS BOI 68 (2nd) Zone 2C
Level and Location for Foundation of MCPE 2 Axis 02X TO 03E (As highlighted)
Level and Location for Ground beam between PC 37-39-41-43 Zone 1G
Level and Location of Excavation for Strip footing in Zone 2H Between PC 140-142-144 (as highlighted)
Installation and Survey Report for Location and Levels of Anchor and Base Plate for Front Canopy @ BU
Installation and Survey Report for Location and Levels of Anchor for Front Canopy @ BUTTRESS BII 10 &
Installation of Rock and Boulder No. RB 265 - 1st Layer (1 of 3)
Installation of Rock and Boulder No. RB 069 - 2nd Layer (2 of 5)
Inspection for Backfilling Sub-base under Boulder no. RB-266A (SP # 109 A-1-A)
INSPECTION FOR INSTALLATION OF ALL RINGS AND SLAB FOR - FW-A-3-8, FW-A-3-9, FW-A-3-10, FW-A-3-
INSPECTION FOR MANHOLE BASE INSTALLATION AND UPVC PIPE CONNECTION FOR - FW-A-3-12, FW-A-3-13
Surface Preparation Prior to Start Backfill Gravel for Manhole - MH-D-02 - as Highlighted
Inspection for application of Protection Board on top of Damp Proofing for External wall and Top Slab o
INSPECTION FOR MANHOLE BASE INSTALLATION AND UPVC PIPE CONNECTION FOR - MH-K-01. (As Highli
"Inspection and Compaction Test for 12th Layer (12 of 14) Backfilling around SBC-09 (Stock Pile # 109 A
"Inspection and Compaction Test for Backfilling (7th Layer) for Storm Water Line from MH-D-01 to MH-D-
INSPECTION FOR INSTALLATION OF ALL RINGS AND SLAB FOR - MH-K-01 (As Highlighted)
Steel Reinforcement for Footing of Boundary wall @ Grid (11-16/Right Side), Behind Plant room, of Av
Concrete Pouring & Shuttering of Footings of Boundary wall @ Grid (11-16/Right Side), Behind Plant r
Coordinates & Levels of Footings of Boundary wall @ Grid (11-16/Right Side), Behind Plant room, of A
Coordinates & Levels for Kicker (2nd Lift) of Straight Wall (Left Side) at Entrance, inside Maze garden,
Concrete pouring & Shuttering for Kicker (2nd Lift) of Straight Wall (Left Side) at Entrance, inside Ma
Excavation & Bed Preparation for Laying of Lighting Control Lines & Low Current Lines, running Under
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) along the Boundary walls (Inner Sid
Inspection & Compaction tests of 4th Layer Backfilling (Sub-Grade) (Out of 6 layers) along the Boundar
Inspection of 1st, 2nd & 3rd Layers of Gravel Backfilling Surround the Manholes (Type 'B' 2 No's)(MH
Marking & Check for coordinates of Tree Pits (24 no's) at Left side of Water Play Garden, at highlight
Concrete pouring for Blinding of Manhole (01 no's) (MH-D-04-01) at Entrance of Physic garden, as per
Excavation & Blinding levels for Manhole (01 no's) (MH-D-04-01) at Entrance of Physic garden, as per
Excavation & Bed Preparation for Fire Alarm & Security Lines and Manholes/Handholes, Inside Discov
Excavation & Bed Preparation for Emergency Lines & Manholes/Handholes, Inside Discovery Garden at
Marking & Check for coordinates of Tree Pits (14 no's), between Mist Garden and Boundary wall Span
Gravel 3/8 Bedding & Geotextile Surround for Sub surface Drainage lines (110mm connecting MH-C-4
Installation of Box and UPVC straight conduit (Dia.25mm) for Power (13A Cleaner Socket,Wall Fuse
Excavation for Telecommunication Line from (G/TL/54 to G/TL/50) including pit G/TL/54, G/TL/50 at Zo
Excavation for Fire & Security Distribution Line from (G/FS/52 to G/TL/50) including Pit G/FS/52, G/FS/
Inspection of Backfilling Sub-grade 6th Layer (6 of 6) around the Manhole (above gravel) for MH-D-06 -
"Inspection and Compaction Test for 11th Layer (11 of 14) Backfilling around SBC-09 (Stock Pile # 109 A
Soil Preparation under Boulder No. RB- 266B
Inspection for application of Damp Proofing (2nd Coat) on top of Primer for External Wall and Top Slab
Inspection for application of Damp Proofing (1st Coat) on top of Primer for External Wall and Top Slab o
Concreting for Strip footing Between PC 31, 33, 35, 37 Zone 1F
Soil Preparation under Boulder No. RB- 266A
Shuttering for Strip footing Between PC 31, 33, 35, 37 Zone 1F
INSPECTION FOR INSTALLATION OF ALL RINGS AND SLAB FOR - MH-K-04, MH-K-05, MH-K-06, MH-K-07 (As
Steel Reinforcements for Strip footing Between PC 31, 33, 35, 37 Zone 1F
Inspection for application of Primer (1 Coat) on External Wall and Top Slab of SBC-08 (As Highlighted)
"Inspection for Casting Blinding Concrete under Gullies - G-F-13, G-F-44&45, G-F-42&43 - as highlighted
Steel Reinforcements for BUTTRESS BOI BOV BII BIV 60 Zone 2A
"Inspection and Compaction Test for Backfilling (6th Layer) for Storm Water Line from MH-D-01-B1 to MH
Concreting for BUTTRESS BII 97, 98 Zone 2J, 2K
Shuttering and Shear Connector for BUTTRESS BII 97, 98 Zone 2J, 2K
Shuttering and Shear Connector for BUTTRESS BIV 52 & 53 (1st) Zone 1N
Inpection of Casting Concrete for Short Piece & Surface Preperation prior to start waterproofing and
Inspection and compaction test 1st layer for backfilling of PC and Stripfooting PC 34-36-38-40-42-44 Zon
Level and Location for Strip footing Between PC 31, 33, 35, 37 Zone 1F
Level and Location for BUTTRESS BII 97, 98 Zone 2J, 2K
Level and Location for BUTTRESS BIV 52 & 53 (1st) Zone 1N
Pipe Installation of Sub-Surface Drainage (Main Line & Branches) Pipes; (110mmØ & 250mmØ-UPVC-C
300 mm Gravel 3/8" Backfilling and Geotextile of Foul Water Line for (110mmØ-UPVC- Class 4) fro
Warning Tape Installation for Storm Water Line Outfall-G from (MH-G-01-05 to MH-G-07) for (400mmØ
300 mm Gravel 3/8" Backfilling and Geotextile for Storm Water Line Outfall-G from (MH-G-01-05 to
Installation of straight UPVC conduit (Dia.32mm Socket Outlet) for Power at the Crescent -02 (Axis 02
Installation of straight UPVC conduit (Dia. 25mm) and Box for Security (CAM) at the Crescent-02 (Axis 0
Installation of straight UPVC conduit (Dia. 25mm) and Box for Voice and Data (WIFI & CAM) at the Cresc
Installation of straight UPVC conduit (Dia. 25mm) and Box for Fire Alarm (Speaker) at the Crescent-02 (
Installation of Rock and Boulder No. RB-153 (6th Layer) (6 of 6)
Installation of Rock and Boulder No. RB-153 (5th Layer) (5 of 6)
Installation of straight UPVC conduit (Dia. 25mm) and Box for Voice and Data (WIFI) at the Crescent-01
Installation of Rock and Boulder No. RB-324 (4th Layer) (4 of 4)
Inspection for casting concrete for short piece and Surface Preperation prior to start waterproofing fo
Inspection and Compaction Test for 1st Layer (1 of 3) backfilling (grading) at Zone - K as highlighted
Installation of straight UPVC conduit (Dia. 25mm) and Box for Fire Alarm (Speaker) at the Crescent-01 (
Inspection and Compaction Test for 1st Layer (1 of 6) backfilling (grading) at Zone - K (Next to RB-334) a
Surface Preparation Prior to Start Backfill Gravel for Manhole - MH-D-01 - as Highlighted
Inspection of Backfilling Sub-grade 5th Layer (5 of 6) around the Manhole (above gravel) for MH-D-06 -
Surface Preparation prior to start Waterproofing for SBC-06 - as highlighted
"Inspection and Compaction Test for Backfilling (6th Layer) for Storm Water Line from MH-D-01 to MH-D-
Inspection for application of Protection Board on top of Damp Proofing for External wall and Top Slab o
Soil Preparation prior to start Cutting and Backfill (-40cm from FGL) at Zone - G&K - as highlighted (Excl
"Inspection and Compaction Test for 10th Layer (10 of 14) Backfilling around SBC-09 (Stock Pile # 109 A
"Surface Preparation Prior to Start Backfill Gravel for Manhole - MH-E-01-1, MH-E-01-2, MH-E-03 - AS H
Inspection & Compaction tests of 4th Layer Backfilling (Sub-Grade) (Out of 8 layers) along the Abutmen
Inspection & Compaction tests of 4th Layer Backfilling (Sub-Grade) (Out of 8 layers) along the Abutmen
Inspection & Compaction Tests of 2nd Layer Sub Garde (Out of 2 Layers) Backfilling (after laying Gr
Single Layer Water proofing membrane 4mm thk. for Foundation of walls (Inner Side) of Whispering C
Geo-Textile (Both sides 500mm wide) on Blinding under boundary wall @ Grid (11-16/Right Side), of A
Protection Layer 4mm thk. Bituminous Protection Board (Both sides 500mm wide) on Blinding under bo
Single Layer Water proofing membrane 4mm thk. (Both sides 500mm wide) on Blinding under boundary w
2nd Coat Cementitious Water Proofing on Blinding under boundary wall @ Grid (11-16/Right Side), of
1st Coat Cementitious Water Proofing on Blinding under boundary wall @ Grid (11-16/Right Side), of A
Solvent Base Primer (Both sides 500mm wide) on Blinding prior to Water proofing membrane under bou
Surface preparation prior to Water proofing on Blinding under boundary wall @ Grid (11-16/Right Side
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 4 layers) along the Boundar
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 4 layers) along the Boundar
Openning of New Conctrol Joint (01no's) on Parapet wall (External Side) at Grid (19/Q-T) at Manageme
Plaster Guide Points & Accessories for Plastering of walls Inside Toilets (GF-5064, 5065 & 5066), Ext
Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Grade) (Out of 6 layers) along the Boundar
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 6 layers) along the Boundar
Surface Preparation & Levels prior to Backfilling along the Boundary wall @ Elevation 'F' (Inner Side
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) along the Boundary walls (Inner Side
Surface preparation prior to Backfilling Surround the Manholes (Type 'B' 2 No's)(MH-D-01-B4 & MH-D-
Surface preparation prior to Waterproofing and Application of Primer coating, 1st & 2nd Coats of D
Surface Preparation Prior to start Backfilling around Pilecap 105-107-109 as highlighted Zone 2C (as hig
Level and Location for Mass Concrete at Zone 2J between PC 146-148 (3rd Layer)
Level and Location for BUTTRESS BOI 93, 94, 95, 96 (with beam) Zone 2H 2J
Concreting for Mass Concrete at Zone 2J between PC 146-148 (3rd Layer)
Shuttering for Mass Concrete at Zone 2J between PC 146-148 (3rd Layer)
Concreting for BUTTRESS BOI 93, 94, 95, 96 (with beam) Zone 2H 2J
Shuttering and Shear Connector for BUTTRESS BOI 93, 94, 95, 96 Zone 2H 2J
Single layer of 4mm thick modified bituminous waterproofing membrane below Strip Footing between
Concreting for BUTTRESS BII 10, 11, 12, 13 (w/ beam) Zone 1C 1D
Shuttering and Shear Connector for BUTTRESS BII 12, 13 Zone 1C 1D
Installation of straight UPVC conduit (Dia.32mm Socket Outlet) for Power at the Crescent -01 (Axis 01
Installation of earthing clamps with conductor 70mm (2pcs.) for earthing reinforcement steel re-bar a
2nd Coat of Damp proofing for Encasement concrete of Manholes (4 no's) (MH-D-03-02, MH-D-03-03,
Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Grade) (Out of 8 layers) along the Abutmen
Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Grade) (Out of 8 layers) along the Abutmen
Protection Layer 4mm thk Bituminous Protection Board for Foundation of walls (Inner Side) of Whisp
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 6 layers) along the Boundar
Stone Coping on Boundary wall (after Stone Cladding for walls) @ Span 6, 7 & 8 of Water Garden, at
Surface preparation prior to Waterproofing and Application of Primer coating, 1st & 2nd Coats
Inspection & Compaction Tests of Single Layer Sub Base Backfilling (after laying sub garde) for Sub
Inspection & Compaction Tests of Single Layer Sub Garde Backfilling (after laying Gravel) for Sub
Stack Boulders Installed 1st layer at Step 4, Right side of Geyser Garden, at Water Garden, At Highlig
Installation of Rock and Boulder No. RB-153 (4th Layer) (4 of 6)
Installation of Rock and Boulder No. RB-324 (3rd Layer) (3 of 4)
Inpection of Casting Concrete for Short Piece & Surface Preperation prior to start waterproofing and Ap
"Inspection and Compaction Test for 9th Layer (9 of 14) Backfilling around SBC-09 (Stock Pile # 108 A-1-
Excavation for Fire & Security Distribution Line from (B/FS/21 to B/FS/36) including Pit B/FS/37 at Zone
Excavation for Telecommunication Line from (B/TL/42 to B/TL/36) including pit B/TL/37 at Zone-B as hi
"Inspection and Compaction Test for NGL for Fire & Security Line at Zone - K (As Highlighted)"
Excavation for Storm Water Line from MH-G-01-02 to G-G-52&53 including Branches, Manhole MH-G-01-
"Inspection and Compaction Test for Backfilling (9th Layer) for Storm Water Line from MH-D-04 to MH-D
"Inspection of Concrete Pouring for the Foundation and Kicker of SBC-06 (As Highlighted)"
"Inspection of Formwork for the Foundation and Kicker of SBC-06 (As Highlighted)"
"Inspection of Steel Reinforcement for the Foundation and Side Walls of SBC-06 (As Highlighted)"
Pipe Installation of Foul Water Line for (160mmØ & 250mmØ - UPVC- Class 4) from (FW-A-3-7 to FW-
Bedding of Gravel 3/8" and Geotextile Surrounding Foul Water Line for (160mmØ & 250mmØ - UPVC-
Pipe Installation of Storm Water Line Outfall-K for (600mmØ & 800mmØ -PP-Corrugated) from (MH-K
Bedding of Gravel 3/8" and Geotextile Surrounding Storm Water Line Outfall-K for (600mmØ & 800m
Surface Preparation and solvent base primer for Tunnel 2 access shaft Zone 2F (as Highlighted)
Surface Preparation and solvent base primer for Strip Footing between PC 38-40-42-44 Zone 1G
Concreting for BUTTRESS BII 07 (1st) Zone 1B
Installation of straight UPVC conduit (Dia.32mm) Socket Outlet for Power at the Crescent-02 (Axis 02
Installation of Straight UPVC Conduit (Dia.25mm 2Pcs) for Voic and Data System (WIFI) at the Crescen
Level and Location of Excavation for Strip footing in Zone 1D Between PC 22 - 24 - 26 (as highlighted)
Installation of Straight UPVC Conduit (Dia.25mm 2Pcs & Box 1Pc) for Fair Alarm System (Speaker) at t
Installation of Straight UPVC Conduit (Dia.25mm 2Pcs) for Voic and Data System (WIFI) at the Crescen
Stone Cladding for Boundary wall at Elevation "B" (Outer Face) and Whispering Cave 2 (Outer sides)
Surface Preparation & Levels prior to Backfilling along the Boundary walls (Inner Side) @ Elevation B,
Solvent Base Primer Coating prior to Membrane Waterproofing for Foundation of wall (Inner Side) of
Protection Layer 4mm thk Bituminous Protection Board for Boundary wall foundation (Outer Face) at
Surface preparation prior to Waterproofing for footing & Kicker of 2 Curved Walls, (Inner & Outer Sid
1st Coat Cementitious Waterproofing for Kicker & Wall of Circular Walls (2, 3, 4, 5, 6 & 7) (Inner & Ou
Inspection & Compaction Tests of Single Layer Sub Base Backfilling (after laying sub garde ) for Sub
Inspection & Compaction Tests of Single Layer Sub Garde Backfilling (after laying Gravel) for Sub su
Pipe Installation of Foul Water Line for (110mmØ-UPVC- Class 4) from (FW-A-13-4 to JURASIC GARDE
Stack Boulders Installed 1st layer at Top & Right Side of Mist Garden (Part 2), At Highlighted area in
Stack Boulders Installed 1st layer (upto Level +879.50) at Left side of Water Play Garden, (Part 6) At
Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Grade) (Out of 5 layers) after Gravel lay
Inspection of Spatter Dash (Rough Coat) for walls Inside Toilet Lobby's (GF-5059B & GF-5060B), Intern
Plaster Guide Points & Accessories for Plastering of walls Inside Change room (GF-5085), Custody of
1st Layer Block Layout of Whispering Cave 1 & 2, @ Sound & Light Garden, At highlighted area in att
Installation of Rock and Boulder No. RB-153 (3rd) (3 of 6)
Installation of Rock and Boulder No. RB-324 (2nd Layer) (2 of 4)
"Inspection of Backfilling Gravel 1st Layer (1 of 3) around the Manhole for MH-E-01-1, MH-E-01-2, MH-
Inspection for Sand Bedding under pipe for Telecommunications Line from KK/D-TL/33 TO K/TL/16 at Zon
Inspection for Sand Bedding under pipe for Fire & Security Line from KK/D-FS/04 TO K/FS/06 at Zone-K a
Inspection for Sand Bedding under pipe for Fire & Security Line from B/FS/24 TO B/FS/21 at Zone-B as h
Inspection for Sand Bedding under pipe for Telecommunications Line from B/TL/21 TO B/TL/42 at Zone-B
INSPECTION FOR MANHOLE BASE INSTALLATION AND UPVC PIPE CONNECTION FOR - MH-K-04 (As Highli
Inspection for Rough Grading (Cut & Fill) upto (-40cm) from the Final Grading Level - as Highlighted
Inspection for Sand Bedding under pipe for Fire & Security Line from K/FS/21 TO K/FS/04 at Zone-K as h
Inspection for Sand Bedding under pipe for Telecommunications Line from K/TL/13 TO K/TL/10 at Zone-K
Inspection and Compaction Test for 3rd Layer (3 of 3) backfilling (grading) at Zone-L as highlighted in t
"Inspection and Compaction Test for Backfilling (9th Layer) for Storm Water Line from MH-D-04 to MH-D-
"Inspection and Compaction Test for Backfilling (8th Layer) for Storm Water Line from MH-D-04 to MH-D
"Inspection and Compaction Test for 8th Layer (8 of 14) Backfilling around SBC-09 (Stock Pile # 108 A-1-
INSPECTION FOR MANHOLE BASE INSTALLATION AND UPVC PIPE CONNECTION FOR - FW-A-3-8, FW-A-3-9,
Level and Location for BUTTRESS (with beam) BII 10 & 11 Zone 1C
Shuttering and Shear Connector for BUTTRESS (with beam) BII 10 & 11 Zone 1C
Concreting for BUTTRESS BOI 70, 71 (2nd) Zone 2C 2D
Concreting for BUTTRESS BOI 8, 9 Zone 1B 1C
Shuttering and Shear Connectorfor BUTTRESS BOI 8, 9 Zone 1B 1C
Concreting for BUTTRESS BII 100, 101, 102 Zone 2K 2L
Concreting for BUTTRESS BII 08 & 09 (2nd) Zone 1B 1C
Level and Location for BUTTRESS BOV 52 & 53 (1st) Zone 1N
Concreting for BUTTRESS BOV 52 & 53 (1st) Zone 1N
Shuttering and Shear Connector for BUTTRESS BOV 52 & 53 (1st) Zone 1N
Steel Reinforcement for BUTTRESS BII 13 Zone 1D
Installation of straight UPVC Conduit (Dia. 4inch.) for TELECOM Duct Bank no.BB/D-TL/37 (4x110mm) B
Installation of straight UPVC conduit (Dia.6 inch.) Medium Voltage Duct Bank (4x160mm) at the Car
Excavation & Bed Preparation for Telecom Lines & Manholes/Handholes, Inside Discovery Garden at h
Excavation & Bed Preparation for Low voltage Lines & Manholes/Handholes, Inside Discovery Garden a
Concrete pouring for Pipe Encasement of Manholes (Type 'A' 3 No's, 'B' 1 no's & 'C' 1 no's)(MH-D-0
Surface preparation prior to Backfilling Surround the Manholes (6 no's) (MH-D-09, MH-D-09-01, MH-D
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 5 layers) along the Boundar
Steel Reinforcement for Footing of Boundary wall @ Grid (11-16/Right Side), Behind Plant room, of Av
Solvent Base Primer Coating prior to Membrane Waterproofing for Foundation & Kicker of Walls (Inner
Single layer 4mm thk Modified Bituminous Water Proofing Membrane for Foundation & Kicker of Walls
2nd Coat Damp proofing for footing & Kicker of Circular Wall (2, 3, 4, 5, 6, 7, 8, 9 & 10) Half Part 1 (
1st Coat Damp proofing for footing & Kicker of Circular Wall (2, 3, 4, 5, 6, 7, 8, 9 & 10) Half Part 1 (
Pipe Sleeve Installation for Strip Footing Pipes ( 160mmØ -UPVC-CL-4), At Crescent-2, Zone 2H, As
Inspection and Compaction Test for NGL for Telecom Line at Zone - K
Inspection for Sand Bedding under pipe for Potable Water Line including branch at Zone-G&K- as highlig
Inspection for application of Damp Proofing (2nd Coat) on top of Primer for External Wall and Top Slab
Inspection for application of Damp Proofing (1st Coat) on top of Primer for External Wall and Top Slab o
Inspection for application of Primer (1 Coat) on External Wall and Top Slab of SBC-05 (As Highlighted)
"Inspection and Compaction Test for Backfilling (8th Layer) for Storm Water Line from MH-D-04 to MH-D-
"Inspection and Compaction Test for Backfilling (7th Layer) for Storm Water Line from MH-D-04 to MH-D
"Inspection and Compaction Test for 7th Layer (7 of 14) Backfilling around SBC-09 (Stock Pile # 108 A-1-
Level and Location for BUTTRESS BOI 68 (1st) Zone 2C
Level and Location for MCPE 1 Outer Wall at Axis 03T to 03S (as Highlighted) Zone 2N 2M
Inspection and compaction test 2nd layer for backfilling of PC and Stripfooting PC 7-9-11 Zone 1B (as hi
Steel Reinforcement for MCPE 2 Outer Wall at Axis 02AE to 03K (as Highlighted) Zone 2J 2K
Concreting for MCPE 1 Outer Wall at Axis 03T to 03S (as Highlighted) Zone 2N 2M
Shuttering for MCPE 1 Outer Wall at Axis 03T to 03S (as Highlighted) Zone 2N 2M
Concreting for Zone 2M Outer Ring Beam axis 02-2, 02AL to 02AP (as highlighted)
Shuttering for Zone 2M Outer Ring Beam axis 02-2, 02AL to 02AP (as highlighted)
Concreting for BUTTRESS BOI 70, 71 (2nd) Zone 2C 2D
Inspection & Compaction Tests of Single Layer Sub Garde Backfilling Surround the Manholes (8 no's
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 5 layers) after Gravel lay
Inspection & Compaction tests of 4th Layer Backfilling (Sub-Grade) (Out of 6 layers) for Sub surface
Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Grade) (Out of 6 layers) for Sub surface
Stack Boulders Installed 2nd layer at Top Right side, inside Geyser Garden, At Highlighted area in at
Gravel 3/8 Bedding & Geotextile Surround for Sub surface Drainage Sub lines (110mm 2no's connec
Primer Coating Prior to Damp proofing for footing & Kicker of Circular Wall (2, 3, 4, 5, 6, 7, 8, 9 & 10
Inspection & Compaction tests of 4th Layer Backfilling (Sub-Grade) (Out of 5 layers) Surround the Light
Surface Preparation prior to Waterproofing for Foundation of wall (Inner Side) of Whispering Cave 1
Single Layer Water proofing membrane 4mm thk. for Foundation of walls (Inner Side) of Whispering C
Gravel 3/8 Bedding & Geotextile Surround for Sub surface Drainage Main line & Sleeve Pipes (250m
Stack Boulders Installed 1st layer at Top Right side, inside Geyser Garden, At Highlighted area in att
Inspection of 1st & 2nd Layers of Gravel Backfilling Surround the Manholes (8 no's: MH-C-2, MH-C-
"INSPECTION OF INSTALLATION OF ALL SLABS FOR MH-D-01, MH-D-01-A1, MH-D-01-A2, MH-D-01-A1-
Installation of Rock and Boulder No. RB 069 (1st Layer) (1 of 5)
"Inspection of Grouting (Horizontal Joints) for Rock Boulder - RB-169a for All Layers"
"Inspection of Grouting (Vertical Joints) for Rock Boulder - RB-169a for All Layers"
"Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-K (Seating
"Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-K (Seating
"Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-K (Seating
"Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-K (Seating A
Installation of straight UPVC ducts (Dia 4 inch) for Fair and Security System Duct bank 2X110MM B
"Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-K (Seating
Excavation for Telecommunication Line from (B/TL/21 to B/TL/42) including pit B/TL/21, B/TL/19, B/TL/
"Inspection for Backfilling Subbase behind the 2nd lift of Rock for Boulder no. RB-069 (under 2nd layer
"Inspection for Backfilling Subgrade behind the 2nd lift of Rock for Boulder no. RB-069 (under 2nd layer
Excavation for Fire & Security Distribution Line from (B/FS/24 to B/FS/21) including Pit B/FS/24, B/FS/
Installation of straight UPVC ducts (Dia 4 inch) for Telecom System Duct bank 4X110MM Between Ma
Inspection for Backfilling Sub-base under Boulder no. RB-265 (Stock Pile # 109 A-1-A)
"Inspection and Compaction Test for 6th Layer (6 of 14) Backfilling around SBC-09 (Stock Pile # 108 A-1-
"INSPECTION FOR INSTALLATION OFSLAB FOR MH-B-01, MH-B-02, MH-B-03, MH-B-04 .(As Highlighted)"
"INSPECTION OF INSTALLATION OF SLAB FOR MH-E-01, MH-E-01-1, MH-E-01-2, MH-E-02, MH-E-03, MH
"INSPECTION FOR INSTALLATION OF RINGS UP TO BOTTOM OF SLAB FOR (MH-B-01) - As Highlighted "
INSPECTION FOR INSTALLATION OF RINGS (RISER) UP TO BOTTOM OF SLAB FOR (MH-A-07, MH-A-08, MH-
Installation of Stub-Up UPVC Conduit (Dia.25mm 2Pcs & Box -1Pc) for Security System (CCTV) at the C
Installation of Straight UPVC Conduit (Dia.25mm 6Pcs & Box 3Pcs) for Fair Alarm System (Speaker) at
Installation of straight UPVC conduit (Dia.32mm 6pcs) Socket Outlet for Power at the Crescent -02 (Ax
Steel Reinforcement for RINGBEAM at Zone 2M (outer) Axis 02AL to 02AP, 02-2
Level and Location for BUTTRESS BOI BII 01 Zone 1A
Level and Location for BUTTRESS BOI 18, 19 (2nd) Zone 1E
Level and Location for BUTTRESS BOI 11 Zone 1C
Concreting for BUTTRESS BOV 93, 94, 95, 96 Zone 2J
Steel Reinforcements for BUTTRESS BII BIV 96 Zone 2J
Steel Reinforcements for BUTTRESS BOI BOV, BII BIV 61 Zone 2A
Concreting for BUTTRESS BOI BII 01 Zone 1A
Shuttering and Shear Connector for BUTTRESS BOI BII 01 Zone 1A
Concreting for BUTTRESS BOI 18, 19 (2nd) Zone 1E
Shuttering for BUTTRESS BOI 18, 19 (2nd) Zone 1E
Concreting for BUTTRESS BOI 11 Zone 1C
Shuttering and Shear Connector for BUTTRESS BOI 11 Zone 1C
Pipe Installation of Sub-Surface Drainage (Main Line & Branches) Pipes; (110mmØ, 160mmØ & 250m
Level and Location for BUTTRESS BOV 93, 94, 95, 96 Zone 2J
Level and Location for BUTTRESS BOI 10 Zone 1C
Shuttering and Shear Connector for BUTTRESS BOV 93, 94, 95, 96 Zone 2J
Steel Reinforcement for BUTTRESS BII 10, 11, 12 Zone 1C
Concreting for BUTTRESS BOI 10 Zone 1C
Shuttering and Shear Connector for BUTTRESS BOI 10 Zone 1C
Level and Location for BUTTRESS BII 07 (2nd) Zone 1B
Concreting for BUTTRESS BII 07 (2nd) Zone 1B
Shuttering and Shear Connector for BUTTRESS BII 07 (2nd) Zone 1B
Excavation & Bed Preparation for Conduits (75mm) Laying for UPS Circuits Line, running Under the Bol
Excavation & Bed Preparation for Conduits (75mm) Laying for Normal Lighting Circuits Line, running U
Excavation & Bed Preparation for Conduits (160mm) Laying for Low Voltage Power Containment Lines,
Excavation & Bed Preparation for Conduits (75mm) Laying for Low Voltage, Emergency and Fire & Securi
Surface preparation prior to Backfilling Surround the Manholes (13 no's: MH-C-2, MH-C-3, MH-C-4,
Surface preparation prior to Waterproofing and Application of Primer coating, 1st & 2nd Coats o
Steel Reinforcement for Ring Beam & Remaining part of Wall @ Grid (14-23/Left Side upto B.O.H End)
Concrete pouring & Shuttering for Kicker of Circular Walls (10) (Remaining part at Entrance wall) Half
Marking & Check for coordinates of Tree Pits (11 no's) at between Geyser Garden and Boundary wall S
Stack Boulders Installed 1st layer at Step 3, Right side of Geyser Garden, at Water Garden, At Highlig
Surface Preparation prior to Stone Cladding for Walls (Inner & Outer Faces) of Outer Canopy 1 & 2, at
2nd Coat Cementitious Waterproofing for Kicker & Wall of Circular Walls (8, 9 & 10) (Inner & Outer Sid
1st Coat Cementitious Waterproofing for Kicker & Wall of Circular Walls (2, 3, 4, 5, 6 & 7) (Inner & Ou
Installation of Rock and Boulder No. RB-324 (1st Layer) (1 of 4)
"Inspection of Grouting (Horizontal Joints) for Rock Boulder - RB-244a for All Layers"
"Inspection of Grouting (Vertical Joints) for Rock Boulder - RB-244a for All Layers"
Inspection for Sand Bedding under pipe for Potable Water Line including branch at Zone-F&G- as highlig
Excavation and Removal of Disposal Materials (-75cm) from Asphalt Level and Bed Preperation prior to
Inspection of Backfilling Sub-grade 4th Layer (4 of 4) around the Manhole (above gravel) for MH-D-08-0
"Inspection and Compaction Test for Backfilling (6th Layer) for Storm Water Line from MH-D-04 to MH-D
"Inspection and Compaction Test for Backfilling (7th Layer) for Storm Water Line from MH-D-04 to MH-D-
Soil Preparation prior to start Backfill (-40cm from FGL) at Zone - K (Next to RB-334) as highlighted
Inspection and Compaction Test for 2nd Layer (2 of 3) backfilling (grading) at Zone-L as highlighted in t
Inspection for Sand Bedding under pipe for Fire & Security Line from B/FS/24 TO B/FS/36 at Zone-B as h
Inspection and Compaction Test for 2nd Layer (2 of 2) Backfilling under Boulder No. RB-265 (Stock Pile #
INSPECTION FOR MANHOLE BASE INSTALLATION AND UPVC PIPE CONNECTION FOR - MH-K-05, MH-K-06,
Surface Preparation prior to start Waterproofing for SBC-05 - as highlighted
Excavation & Bed Preparation for Sub surface Drainage lines (110mm connecting MH-C-4 & Sleeves),
Surface preparation prior to Waterproofing and Application of Primer coating, 1st & 2nd Coats of
Aluminium Falshing & Sealant for Waterproofing on Foundation of Boundary wall (Outer Side) of Whis
Inspection & Compaction Tests of Single Layer Sub Garde Backfilling Surround the Manholes (Type 'A
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 5 layers) after Gravel lay
Inspection & Compaction Tests of Single Layer Sub Base Backfilling (Final Layer) Surround the Manhol
"Surface Preparation Prior to Start Backfill Gravel for Manhole - MH-E-01, MH-E-01-1, MH-E-01-2, MH-
INSPECTION FOR MANHOLE BASE INSTALLATION AND UPVC PIPE CONNECTION FOR - MH-E-03 (As Highli
Level and Location for Strip Footing between PC 38-40-42-44 Zone 1G (as highlighted)
"Inspection of Concrete Pouring for Walls and Top Slab of SBC-08 As Highlighted"
"Inspection of Formwork and Level for Walls and Top Slab of SBC-08 As Highlighted"
"Inspection of Steel reinforcement for Top Slab of SBC-08 As Highlighted"
Soil Preparation prior to start Cutting and Backfill (-40cm from FGL) at Zone - K - as highlighted
Inspection and Compaction Test for 1st Layer (1 of 2) Backfilling under Boulder No. RB-265 (Stock Pile #
Concreting for BUTTRESS BOI 70 & 71 (1st) Zone 2C 2D
"Inspection for casting concrete for short piece and Surface Preperation prior to start waterproofing f
Inspection for Sand Bedding under pipe for Telecommunications Line from B/TL/21 TO B/TL/36 at Zone-B
Excavation for Storm Water Line from MH-G-01-05 to MH-G-01-02 including Branch and Manhole MH-G
Inspection for Sand Bedding under pipe for Potable Water Line at Zone-F - as highlighted in the attached
Surface Preparation and Solvent Base Primer for Strip Footing (RC) zone 1G Inner PC 38-40-42-44
Inspection & Compaction Tests of Single Layer Sub Garde Backfilling Surround the Manhole (MH-C-8),
"INSPECTION FOR INSTALLATION OF SLABS FOR FW-A-13, FW-A-14, FW-A-15, FW-A-16, FW-A-17, FW-A-1
Inspection of 1st, 2nd & 3rd Layers of Gravel Backfilling Surround the Manhole (MH-C-8), Inside Wate
Inspection of Backfilling Sub-grade 3rd Layer (3 of 4) around the Manhole (above gravel) for MH-D-08-0
"Inspection and Compaction Test for 5th Layer (5 of 14) Backfilling around SBC-09 (Stock Pile # 108 A-1-
Stack Boulders Installed 1st layer at Top & Left Side of Mist Garden, (Part 6) At Highlighted area in a
Inspection and compaction test 1st layer for backfilling of PC and Stripfooting PC 7-9-11 Zone 1B (as hig
Excavation for Storm Water Line Manhole - MH-K-01 prior to start Gravel Bedding (as Highlighted)
"Inspection and Compaction Test for Backfilling (6th Layer) for Storm Water Line from MH-D-04 to MH-D-
Inspection of Backfilling Sub-grade 2nd Layer (2 of 4) around the Manhole (above gravel) for MH-D-08-0
Inspection of Backfilling Sub-grade 4th Layer (4 of 6) around the Manhole (above gravel) for MH-D-06 -
Soil Preparation under Boulder No. RB- 265
Inspection of Backfilling Sub-grade 3rd Layer (3 of 6) around the Manhole (above gravel) for MH-D-06 -
INSPECTION FOR INSTALLATION OF ALL RINGS FOR FW-A-13. (As Highlighted)
INSPECTION FOR INSTALLATION OF SLABS FOR (MH-A-01, MH-A-02, MH-A-03, MH-A-06, MH-A-07, MH-A
INSPECTION FOR INSTALLATION OF SLABS FOR (FW-A-3-6.2, FW-A-3-6.3, FW-A-3-6.4, FW-A-3-6.5, FW-A-3
Inspection for application of Bituminous Damp Proofing (2nd Coat) on top of Primer for Foundation and
Inspection for application of Bituminous Damp Proofing (1st Coat) on top of Primer for Foundation and
Inspection for application of Base Primer (50%x50% Bitumin & Water) on Beam at Saeting Area (3) Zone-
"Surface Preperation prior to start waterproofing and Application of Primer (1st Coat, 2nd Coat and 3r
"Inspection and Compaction Test for Backfilling (5th Layer) for Storm Water Line from MH-D-04 to MH-D
Stack Boulders Installed 2nd layer (Remaining) upto Level +877.05 (Part 5), Between Geyser Garden
Installation of UPVC straight conduit (Dia.25mm) and Box for Voice and DATA (Data & TV Outlet) at
Protection Layer 4mm thk Bituminous Protection Board for Boundary wall foundation (Inner Face) at
Slated Layer 4mm thk Modified Bituminous Waterproofing membrane for Foundation (Outer Face) of Ou
Protection Layer 4mm thk Bituminous Protection Board for Waterproofing of Foundation (Outer Face) o
"Inspection of Grouting (Vertical Joints) for Rock Boulder - RB-170 for All Layers"
"Inspection of Grouting (Horizontal Joints) for Rock Boulder - RB-170 for All Layers"
Installation of Rock and Boulder No. RB-153 (2nd) (2 of 6)
Installation of Rock and Boulder No. RB-337 (8th Layer) (8 of 8)
Installation of Rock and Boulder No. RB-244A (4th Layer) (4 of 4)
Installation of Rock and Boulder No. RB-153 (1st) (1 of 6)
Installation of Rock and Boulder No. RB-169a (3rd Layer) (3 of 3)
Installation of Rock and Boulder No. RB-169a (2nd Layer) (2 of 3)
Inspection for Sand Bedding under pipe for Fire Water Line including Branch at Zone-F,G & K as highligh
"Inspection of Formwork and Level for Walls and Top Slab of SBC-06 As Highlighted"
"Inspection of Steel reinforcement for Top Slab of SBC-06 As Highlighted"
"Inspection for Casting the Blinding Concrete under the Manhole FW-A-3-12, FW-A-3-13, FW-A-3-14, F
Inspection for Casting Blinding Concret under Manhole MH-K-01, MH-K-02 - as highlighted
Excavation for Fire & Security Distribution Line from (K/FS/05 to K/FS/06) including Pit K/FS/05, K/FS/0
Excavation for Telecommunication Line from (K/TL/19 to K/TL/16) including pit K/TL/19, K/TL/16 at Zon
"Inspection and Compaction Test for Backfilling 3rd Layer (3 of 3) for Telecom Line from B/TL/21 to B/TL/
"Inspection and Compaction Test for 4th Layer (4 of 14) Backfilling around SBC-09 (Stock Pile # 108 A-1-
Inspection and Compaction Test for 1st Layer (1 of 3) backfilling (grading) at Zone-L as highlighted in t
INSPECTION FOR INSTALLATION OF ALL RINGS FOR MH-X-01-1, MH-X-02, MH-X-03 .(As Highlighted)
INSPECTION FOR INSTALLATION OF ALL RINGS FOR MH-B-02, MH-B-04 .(As Highlighted)
INSPECTION FOR INSTALLATION OF ALL RINGS FOR MH-A-01, MH-A-02, MH-A-03, MH-A-11, MH-A-12, MH
"INSPECTION FOR INSTALLATION OF SLABS FOR (FW1-2, FW1-2.1, FW1-3, FW5, FW6, FW7, FW8, FW9, F
"INSPECTION FOR INSTALLATION OF RINGS UP TO BOTTOM OF SLAB FOR (FW1-2, FW1-1, FW5, FW8, FW9
"INSPECTION FOR INSTALLATION OF RINGS UP TO BOTTOM OF SLAB FOR (FW6 and FW9) - As Highlighte
"INSPECTION FOR INSTALLATION OF RINGS UP TO BOTTOM OF SLAB FOR (MH-X-01) - As Highlighted "
"INSPECTION FOR INSTALLATION OF SLABS FOR (FW1-2.2, FW1-2.3, FW1-3.1, FW1-3.2, FW1-4, FW6-2,
Surface preparation prior to Backfilling Surround the Manhole (MH-C-8), Inside Water Garden, at high
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 6 layers) for Sub surfac
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 4 layers) for Sub surface
1st Coat Cementitious Waterproofing for Kicker & Wall of Circular Walls (8, 9 & 10) (Inner & Outer Sid
Surface Preparation Prior to Stone Cladding for Boundary wall (Outer Side) of Whispering Cave 1, @
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 5 layers) along the Boundar
Slated Layer 4mm thk Modified Bituminous Waterproofing membrane for Foundation of Boundary wall
Protection Layer 4mm thk Bituminous Protection Board for Foundation of Boundary wall (Outer Side)
Inspection of External Plastering of Wall Elevation at Grid (14-17/W) at Management Building, as high
"Inspection of Concrete Pouring for Walls and Top Slab of SBC-06 As Highlighted"
Inspection of Plastering for walls Inside Private rooms (GF-5003 & 5005), Roof Access (GF-5025), Sto
Plaster Guide Points & Accessories for Plastering of walls Inside Toilet Lobby's (GF-5059B & GF-5060B
Gravel 3/8 Bedding & Geotextile Surround for Sub surface Drainage line Pipe (250mm pipe Connected t
Pipe Installation of Potable Water Networks for (200mmØ-UPVC-Class-5). As per highlighted Area in
Pipe Sleeve Installation for Strip Footing Pipes ( 250mmØ -UPVC-CL-4), At Crescent-2, Zone 2J, As p
Pipe Installation of Sub-Surface Drainage (Main Line & Branches) Pipes; (250mmØ &110mmØ-UPVC-C
Pipe Installation of Fire Fighting Networks for (250mmØ-UPVC-Class-5), Including Thrust Blocks. As p
Concreting for Mass Concrete at Zone 2J between PC 146-148, 150-152 (2nd Layer)
Anti Termite Application under Mass Concrete at Zone 2J between PC 146-148, 150-152 (2nd Layer)
Shuttering and Shear Connector for BUTTRESS BIV 97, 98 Zone 2J 2K
Steel Reinforcement for BUTTRESS BIV BII 78, 79, 80, 81 Zone 2E 2F
Level and Location for Mass Concrete at Zone 2J between PC 146-148, 150-152 (2nd Layer)
Level and Location for BUTTRESS BIV 97, 98 Zone 2J 2K
Surface Preparation Prior to start Backfilling For Zone 1B Around PC and Strip footing upto top of Mass
Inspection and compaction test 4th layer for backfilling of PC and Stripfooting PC 134-136-138-140 Zone
Concreting for BUTTRESS BII 18, 19 (2ND) Zone 1E
Steel Reinforcement for BUTTRESS BOI BOV, BII BIV 62, 63 Zone 2A 2B
Concreting for BUTTRESS BOV 02 Zone 1A
Concreting for BUTTRESS BOV 10 Zone 1C
Concreting of Buttress BII 65 (2nd) zone 2B (to close KAIG3-NCR-CO-S-0006-00)
Concreting for BUTTRESS BOI 68 (1st) Zone 2C
Shuttering and Shear Connector for BUTTRESS BOI 68 (1st) Zone 2C
Concreting for BUTTRESS BIV 97, 98 Zone 2J 2K
Surface Preparation and Solvent Base Primer below Strip Footing between PC 193-195 Zone 2R
Steel Reinforcements for MCPE wall (external side as highlighted) Axis 02AH - 02AF Zone 2J 2K
2nd Coat Damp proofing for Boundary wall foundation (Outer Face) at Elevation "C, D & E" @ Sound
1st Coat Damp proofing for Boundary wall foundation (Outer Face) at Elevation "C, D & E" @ Sound &
Stone Cladding for Boundary wall at Elevation "G" (Inner & Outer Faces) and Elevation "H" (All sides
Stone Coping on Boundary wall (after Stone Cladding for walls) @ Span 09, 10 & 11 of Water Garden,
Concrete pouring for Encasement of Pipes for Manholes (2 no's) (MH-D-09 & MH-D-11) (Type B-1 no's,
Concrete pouring for Encasement of Shot piece's of Manholes (Type 'B' 1 No's)(MH-D-01-B5) Inside So
Surface Preparation Prior to Backfilling along the Boundary wall (Outer Side) from Entrance wall At El
Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Grade) (Out of 5 layers) Surround the Light
Excavation & Bed Preparation for Sub surface Drainage Sub lines (110mm 2no's connecting to Main
Stack Boulders Installed 5th layer upto Level +878.50 (Part 5), Between Geyser Garden & Boundary wa
Stack Boulders Installed 4th layer at Level +876.60, (Part 4) along Planted Bed 2 to 3 and above, Ins
Completion of Stack Boulders with Grouting for Planted bed of Boat Garden, at highlighted area in a
Excavation & Soil Preparation for Stack Boulders at Top & Right Side of Mist Garden, at highlighted a
INSPECTION FOR INSTALLATION OF ALL RINGS FOR FW-A-14, FW-A-15, FW-A-16, FW-A-17, FW-A-18, FW-
INSPECTION FOR INSTALLATION OF ALL RINGS FOR FW-A-3-6.2, FW-A-3-6.3, FW-A-3-6.4, FW-A-3-6.5, FW-
INSPECTION FOR INSTALLATION OF ALL RINGS FOR FW-A-3-7. (As Highlighted)
"INSPECTION FOR INSTALLATION OF RINGS UP TO BOTTOM OF SLAB FOR (FW1, FW1-1, FW1-2.1, FW1-2.
Installation of Straight UPVC Conduit (Dia.32mm 6Pcs ) for Security System (CAM) at the Physic Gard
Installation of Straight UPVC Conduit (Dia.32mm 6Pcs) for Fair Alarm System (Speaker) at the Physic
Installation of Straight UPVC Conduit (Dia.32mm 6Pcs) for Voic and Data System (WIFI) at the Physic
Installation of straight UPVC conduit (Dia.32mm 2pcs) Socket Outlet for Power at Physic Garden as p
Installation of straight UPVC ducts (Dia 4 inch) for Telecom System Duct bank 4X110MM Between Ma
Installation of Rock and Boulder No. RB-337 (7th Layer) (7 of 8)
Installation of Rock and Boulder No. RB-244A (3rd Layer) (3 of 4)
"Inspection for Casting Blinding Concret under Manhole MH-K-03, MH-K-04, MH-K-05, MH-K-06, MH-K-07
"Inspection for Casting the Blinding Concrete under the Manhole FW-A-3-8, FW-A-3-9, FW-A-3-10, FW-A
"Inspection and Compaction Test for Backfilling (5th Layer) for Storm Water Line from MH-D-04 to MH-D-
"Inspection and Compaction Test for Backfilling (4th Layer) for Storm Water Line from MH-D-04 to MH-D
Inspection of Backfilling Sub-grade 1st Layer (1 of 4) around the Manhole (above gravel) for MH-D-08-01
"Inspection and Compaction Test for 3rd Layer (3 of 14) Backfilling around SBC-09 (Stock Pile # 108 A-1-
Inspection for Backfilling Sub-base under Boulder no. RB-069
Installation of straight UPVC ducts (Dia 4 inch) for Fair System Duct bank 2X110MM Between Manhol
Inspection for Sand Bedding under MV Line From B/MV/12 to G/MV/19 as highlighted in the attached dra
Pipe Installation of Storm Water Line Outfall-G for (400mmØ-UPVC- Class 4). As per highlighted Area
Bedding of Gravel 3/8" and Geotextile Surrounding Storm Water Line Outfall-G for (400mmØ-UPVC- Cl
Warning Tape Installation for Storm Water Line Outfall-F for (600mmØ-PP-Corrugated) from (MH-F-
300 mm Gravel 3/8" Backfilling and Geotextile for Storm Water Line Outfall-F for (600mmØ-PP-Cor
Level and Location for BUTTRESS BOI 8, 9 Zone 1B 1C
Pipe Installation of Fire Fighting Networks for (250mmØ-UPVC-Class-5). As per highlighted Area in t
Level and Location of Excavation for Strip footing in Zone 2F Between PC 127 - 129 (as highlighted)
Concreting for BUTTRESS BOI 8, 9 Zone 1B 1C
Shuttering and Shear Connectorfor BUTTRESS BOI 8, 9 Zone 1B 1C
Steel Reinforcement for BUTTRESS BOV BOI 80, 81, BIV BII 77 Zone 2E 2F
Concreting for Ground Beam Between PC 180 - 182 Zone 2N
Shuttering for Ground Beam Between PC 180 - 182 Zone 2N
Steel Reinforcement for Ground Beam Between PC 180 - 182 Zone 2N
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 4 layers) after Gravel la
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 6 layers) for Sub surface
Surface preparation prior to Waterproofing and Application of Primer coating, 1st & 2nd Coats of D
Solvent Base Primer Coating prior to Membrane Waterproofing for Foundation & Kicker of Walls (Outer
Slated layer 4mm thk Modified Bituminous water proofing membrane for Foundation of Boundary wall
Protection layer 4mm thk Bituminous protection board for Foundation of Boundary wall (Outer Face) @
Excavation & Soil Preparation Prior to Install Stack Boulders, at Top Right side, inside Geyser Garden,
"Inspection and Compaction Test for NGL under Sub-Base of Bounder No. RB-069 "
INSPECTION FOR MANHOLE BASE INSTALLATION AND UPVC PIPE CONNECTION FOR - MH-F-04 (As Highli
Inpection of Casting Concrete for Short Piece & Surface Preperation prior to start waterproofing and
Inspection of Backfilling Sub-grade 2nd Layer (2 of 3) around the Manhole (above gravel) for MH-D-03 -
"Inspection and Compaction Test for 2nd Layer (2 of 14) Backfilling around SBC-09 (Stock Pile # 108 A-1
Inspection of Backfilling Sub-grade 2nd Layer (2 of 6) around the Manhole (above gravel) for MH-D-06 -
"Inspection and Compaction Test for Backfilling (3rd Layer) for Storm Water Line from MH-D-04 to MH-D
INSPECTION OF INSTALLATION OF ALL RINGS (RAISER) FOR MH-F-01, MH-F-01-1, MH-F-01-2, MH-F-01-3
INSPECTION OF INSTALLATION OF ALL RINGS (RAISER) FOR MH-E-01, MH-E-01-1, MH-E-01-2, MH-E-02
INSPECTION OF INSTALLATION OF ALL RINGS (RISER) FOR MH-H-01, MH-H-02, MH-H-03 (AS ATTACHED).
INSPECTION OF INSTALLATION OF ALL RINGS (RAISER) FOR MH-D-01, MH-D-01-A1, MH-D-01-A2, MH-D
Inspection for Sand Bedding under pipe for Telecommunications Line at Zone-K as highlighted in the att
Inspection for Sand Bedding under pipe for Fire & Security Line at Zone-K as highlighted in the attached
Inspection and compaction test 3rd layer for backfilling of PC and Stripfooting PC 134-136-138-140 Zone
Level and Location for Perimeter Wall at AXIS 02-2, 02AT to 02AS Between BOI BOV 115 - 116 Zone 2N (
Level and Location for BUTTRESS BOI 70, 71 (2nd) Zone 2C 2D
Steel Reinforcement for BUTTRESS BOV BOI 77, 78, 79 Zone 2E
Concreting for Perimeter Wall at AXIS 02-2, 02AT to 02AS Between BOI BOV 115 - 116 Zone 2N (as Highl
Shuttering for Perimeter Wall at AXIS 02-2, 02AT to 02AS Between BOI BOV 115 - 116 Zone 2N (as Highl
Concreting for Strip footing Between PC 32-34-36-38 Zone 1F
Shuttering and Shear Connectorfor BUTTRESS BOI 70, 71 (2nd) Zone 2C 2D
Repairing of Edges and Curves for Ring Beam Zone 2P at Axis 02-1, 02-AT, 02-AW to close Site Instruct
Grouting for Stone Cladding of Boundary wall (Outer Side) at Span 64, 65 & 66A and Column's C64, C
Aluminium Flashing & Sealant for water proofing on Foundation & Kicker of Walls (Outer Face) of Oute
Aluminium Flashing & Sealant for water proofing on Foundation & Kicker of Walls (Outer Face) of Out
Surface preparation prior to Waterproofing for footing & Kicker of Circular Wall (2, 3, 4, 5, 6, 7, 8, 9
Coordinates & levels of Footing at Grid (1-2 & 20-21/A-B), (2-6/A) & (12-20/A) Inside Butterfly Garden
Concrete Pouring & Shuttering for Footing at Grid (1-2 & 20-21/A-B), (2-6/A) & (12-20/A) Inside Butte
Concrete pouring & Shuttering for Kicker (1st Lift) of Straight Wall (Left Side) at Entrance, inside Maz
Coordinates & Levels for Kicker (1st Lift) of Straight Wall (Left Side) at Entrance, inside Maze garden,
Coordinates & Levels of Wall for Straight Wall (Right Side) at Entrance, inside Maze garden, as per hi
Installation of straight UPVC ducts (Dia 6 inch) Mediam Voltage Duct bank 1x5X160MM BETWEEN
Concreting for Plain Concrete of Strip footing between PC 193-195 Zone 2R
Shuttering for Plain Concrete of Strip footing between PC 193-195 Zone 2R
Anti Termite Application under Plain Concrete of Strip footing between PC 193-195 Zone 2R
Concreting for BUTTRESS BOV 18, 19 (2nd) Zone 1E
Shuttering for BUTTRESS BOV 18, 19 (2nd) Zone 1E
Concreting of MCPE 3 Wall at Axis 02R to 02Q (as highlighted) Zone 2E
Shuttering of MCPE 3 Wall at Axis 02R to 02Q (as highlighted) Zone 2E
Concreting for BUTTRESS BOI BOV 19 (1st) Zone 1E
Shuttering for BUTTRESS BOI BOV 19 (1st) Zone 1E
Concreting for BUTTRESS BOV 8 & 9 Zone 1C 1D
Installation of Rock and Boulder No. RB-337 (6rd Layer) (6 of 8)
Installation of Rock and Boulder No. RB-244A (2nd Layer) (2 of 4)
Concreting of MCPE 2 foundation at Axis 03J to 02AB (as highlighted) Zone 2G 2H
Installation of Rock and Boulder No. RB-061 (4th, 5th & 6th Layer) (6 of 6)
Excavation for Storm Water Line from MH-K-07 to Outfall K including Manhole MH-K-01, MH-K-02, MH-K
"Excavation for Foul Water Line from FW-A-3-7 to FW-A-3-17 including the Manhole FW-A-3-7, FW-A-3
Shuttering of MCPE 2 foundation at Axis 03J to 02AB (as highlighted) Zone 2G 2H
Excavation for Fire & Security Distribution Line from (K/FS/21 to K/FS/05) including Pit K/FS/21, K/FS/
Excavation for Telecommunication Line from (K/TL/13 to K/TL/19) including pit K/TL/13, K/TL/08, K/TL/
"Inspection and Compaction Test for Backfilling 2nd Layer (2 of 3) for Telecom Line from B/TL/21 to B/TL/
"Inspection and Compaction Test for Backfilling 1st Layer (1 of 3) for Telecom Line from B/TL/21 to B/TL/
Concreting for BUTTRESS BOV BIV 01 Zone 1A
Inspection for application of Protection Board on top of Damp Proofing for External wall and Top Slab o
Inspection for application of Damp Proofing (2nd Coat) on top of Primer for External Wall and Top Slab
Inspection for application of Damp Proofing (1st Coat) on top of Primer for External Wall and Top Slab o
Inspection for application of Primer (1 Coat) on External Wall and Top Slab of SBC-09 (As Highlighted)
Inspection for Blinding Concrete under Transition Area (As Highlighted)
Concreting for Strip Footing between PC 38-40-42-44 Zone 1G (as highlighted)
Steel Reinforcement for Strip Footing between PC 38-40-42-44 Zone 1G (as highlighted)
Steel Reinforcement for BUTTRESS BII BIV 02 Zone 1A
Concreting for BUTTRESS BII 4, 5, 6 (2ND) Zone 1A 1B
Concreting for BUTTRESS BIV 19 (2ND) Zone 1E
Inspection for Backfilling Sub-base under Boulder no. RB-324 (Stock Pile # 109 A-1-A)
Level and Location for Plain Concrete of Strip footing between PC 193-195 Zone 2R
Level and Location for BUTTRESS BOV 18, 19 (2nd) Zone 1E
Level and Location for BUTTRESS BOI 68 (1st) Zone 2C
Level and Location for Infill Wall Between Buttress BO 113 -114 at Zone 2N (as highlighted) as per KA
"Inspection and Compaction Test for 1st Layer (1 of 14) Backfilling around SBC-09 (Stock Pile # 108 A-1-
Installation of Stub-Up UPVC Conduit (Dia.25mm 2Pcs) for Voic and Data (WIFI) at the Crescent-01 as
Installation of Stub-Up UPVC Conduit (Dia.25mm 2Pcs) for Fair Alarm System (Speaker) at the Crescen
Installation of straight UPVC conduit (Dia.32mm 2pcs) Socket Outlet for Power at the Crescent -01 (A
Installation and Fixation of Base plates & Anchor Bolts and Check Coordinates & Levels for Footing at
Primer Coating Prior to Damp proofing for Boundary wall foundation (Outer Face) at Elevation "C, D
Surface Preparation prior to Waterproofing for Foundation & Kicker of Walls (Inner Face) of Outer Ca
Inspection of 2nd Layer Gravel Backfilling around the Manholes (Type 'A' 4 no's) (MH-D-01-A1-02,
Concrete Pouring & Shuttering for Wall of Straight Wall (Right Side) at Entrance, inside Maze garden,
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 4 layers) along the Boundar
Surface Preparation Prior to Backfilling along the Boundary wall (Outer Side) At Elevation "C to D to
Single Layer Water proofing membrane 4mm thk. for Foundation of Boundary wall (Outer Side) of Whi
Single Layer Water proofing membrane 4mm thk. for Foundation of Boundary wall (Outer Face) @ Grid
Inspection & Compaction tests of 4th/Final Layer Backfilling (Sub-base) (Out of 4 layers), at Top Right
Steel Reinforcement for Footing at Grid (1-2 & 20-21/A-B), (2-6/A) & (12-20/A) Inside Butterfly Garde
Surface Preparation prior to Continue backfilling of PC and Stripfooting PC 134-136-138-140 Zone 2G (as
Inspection and compaction test 5th layer for backfilling at Zone 2E PC and Strip Footing PC-120-122-124
Level and Location for Strip footing Between PC 180 - 182 Zone 2N
Installation of Stub-Up UPVC Conduit (Dia.32mm 2Pcs ) for Security System (PTZ CCTV) at the Crescen
Installation of straight UPVC conduit (Dia.32mm 2pcs & Box 1pc) Socket Outlet for Power at the Cresc
Level and Location for Strip footing Between PC 32-34-36-38 Zone 1F
Installation of straight UPVC conduit (Dia. 25mm) and Box for Fire Alarm (Speaker) at the Crescent-02
"Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-G (Seating
Soil Preparation prior to start backfill near SBC-09 at Zone - B - as highlighted
Installation of Rock and Boulder No. RB-244A (1st Layer) (1 of 4)
Inspection for Excavation of Transition Area (As Highlighted)
Inspection for Backfilling Sub-base under Boulder no. RB-153
Inspection and Compaction Test for 2nd Layer (2 of 2) Backfilling under Bouder No. RB-324 (Stock Pile #
Inspection and Compaction Test for 1st Layer (1 of 1) Backfilling for MV Line From B/MV/12 to G/MV/19 a
Shuttering for Strip footing Between PC 32-34-36-38 Zone 1F
Soil Preparation under Boulder No. RB- 153
Steel Reinforcement for Strip footing Between PC 32-34-36-38 Zone 1F
"Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-G (Seating
Inspection and Compaction Test for 2nd Layer (2 of 2) Backfilling under Bouder No. RB-337 (Stock Pile #
Casting Blinding Concret under Manhole MH-F-01, MH-F-01-1, MH-F-01-2, MH-F-01-3, MH-F-01-4 and Gull
Pipe Installation of Storm Water Line- Outfall X & Outfull-B for (450mmØ-UPVC- Class 4) of Pipe Conne
Warning Tape Installation for Foul Water Line for (110mmØ-UPVC- Class 4) from (FW-A-13-4 to Garde
300 mm Gravel 3/8" Backfilling and Geotextile for Foul Water Line for (110mmØ-UPVC- Class 4) from
Installation of Straight UPVC Ducts (dia. 6 inch.) Low Voltage Duct Bank 2x160 MM as highlighted on
Installation of Rock and Boulder No. RB-337 (5th Layer) (5 of 8)
Inspection for Sand Bedding under MV Line from B/MV/21 to B/MV/12 at Zone-B as highlighted in the at
"Inspection and Compaction Test for Backfilling (1st Layer) for MV Line from B/MV/09 to B/MV/21 - as Hi
Inspection for Sand Bedding under pipe for Fire Water Line at Zone - B as highlighted in the attached dr
Soil Preparation under Boulder No. RB- 069
Excavation for MV Line FROM B/MV/12 TO G/MV/19 includign Pit B/MV/12, G/MV/08, G/MV/36, G/MV
Inspection of Duct Bank for the MV Line from B/MV/07 to B/MV/12 (As Highlighted)
Inspection and Compaction Test for 1st Layer (1 of 2) Backfilling under Bouder No. RB-324 (Stock Pile # 1
Soil Preparation under Boulder No. RB- 324
Inspection & Compaction tests of 3rd Layer Backfilling (Sub-Grade) (Out of 4 layers), at Top Right sid
INSPECTION FOR MANHOLE BASE INSTALLATION AND UPVC PIPE CONNECTION FOR SHORT PIECE FOR - FW
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 4 layers), at Top Right sid
Inspection & Compaction tests of Single Layer Backfilling (Sub-Base) after Sub-Grade laying for Sub
Inspection & Compaction tests of Single Layer Backfilling (Sub-Grade) after Gravel laying for Sub s
Concrete Pouring for Blinding of Boundary wall @ Grid (11-16/Right Side), of Aviary garden, At Highli
Concreting for Infill Wall Between Buttress BO 113 -114 at Zone 2N (as highlighted)
Excavation & Soil Preparation for Water Feature Sleeves (3 no's of 315mm Dia.) and Return Pipe line
INSPECTION FOR MANHOLE BASE INSTALLATION AND UPVC PIPE CONNECTION FOR - MH-E-01 (As Highli
Slated Layer 4mm thk Modified Bituminous Waterproofing membrane for Waterproofing of Foundation &
Shuttering for Infill Wall Between Buttress BO 113 -114 at Zone 2N (as highlighted)
Protection Layer 4mm thk Bituminous Protection Board for Waterproofing of Foundation & Kicker (Oute
Surface Preparation prior to Waterproofing for Foundation & Kicker of Walls (Outer Faces) of Outer C
Installation and Survey Report for Location and Levels of Anchor and Base Plate for Front Canopy @ BU
Concrete pouring for Encasement of Pipes for Manholes (14 no's: MH-C-1, MH-C-2, MH-C-3, MH-C-4,
Inspection and compaction test 2nd layer for backfilling for Zone 1P (as highlighted) Zone 1P SP#121 (2 o
Level and Location for BUTTRESS BII 100, 101, 102 Zone 2K 2L
Level and Location for BUTTRESS BII 08 & 09 (2nd) Zone 1B 1C
Level and Location for BUTTRESS BII 07 (1st) Zone 1B
Steel Reinforcement for BUTTRESS BII BIV 52 Zone 1N
Concreting for BUTTRESS BII 100, 101, 102 Zone 2K 2L
Shuttering and shear connector for BUTTRESS BII 100, 101, 102 Zone 2K 2L
Concreting for BUTTRESS BII 08 & 09 (2nd) Zone 1B 1C
Shuttering and shear connector for BUTTRESS BII 08 & 09 (2nd) Zone 1B 1C
Concreting for BUTTRESS BII 07 (1st) Zone 1B
Shuttering and Shear Connector for BUTTRESS BII 07 (1st) Zone 1B
Steel Reinforcement for Perimeter Wall and counter fort at AXIS 02-2, 02AT to 02AS Between BOI BOV 1
Excavation & Bed Preparation for Sub surface Drainage Main line & Sleeve Pipes (250mm & 110mm) A
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 4 layers) along the Boundar
Inspection of 1st Layer Gravel Backfilling around the Manholes (Type 'A' 4 no's) (MH-D-01-A1-02, M
Steel Reinforcement for Wall of Straight Wall (Right Side) at Entrance, inside Maze garden, as per hig
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 5 layers) Surround the Light
Excavation & Bed Preparation for Sub surface Drainage Sub line (160mm connecting to Sub Main line
Gravel 3/8 Bedding & Geotextile Surround for Sub surface Drainage Sub lines & Sleeves Pipes (250m
Gravel 3/8 Bedding & Geotextile Surround for Sub surface Drainage Sub line (315mm from MH-C-7 to
Stack Boulders Installed 3rd layer at Level +876.20, along Planted Bed 2 to 3 and above, Inside Water
Stack Boulders Installed 1st layer at Step 2, Right side of Geyser Garden, at Water Garden, At Highlig
Excavation & Soil Preparation for Stack Boulders at Top & Left Side of Mist Garden, at highlighted are
Marking & Check for coordinates of Tree Pits (12 no's) at along the Geyser Garden Inside Water Garde
Installation of Rock and Boulder No. RB-063 (5th Layer) (5 of 5)
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 4 layers), at Top Right side
Installation of Rock and Boulder No. RB-063 (4th Layer) (4 of 5)
Gravel 3/8 Bedding & Geotextile Surround for Sub surface Drainage Main line Pipes (250mm pipe Conne
Stack Boulders Installed 4th layer upto Level +878.00 (Part 5), Between Geyser Garden & Boundary wa
Inspection for Sand Bedding under pipe for Telecommunications Line from K/TL/22 TO K/TL/03 at Zone-K
Inspection for Sand Bedding under pipe for Fire & Security Line from K/FS/07 to K/FS/03 at Zone-K as hi
Inspection for Rough Grading (Cut & Fill) upto (-40cm) from the Final Grading Level - as Highlighted
Notification to Start Cut and Fill upto (-20cm) from the finishing level in the crescent wadi garden as h
Surface Preperation prior to start waterproofing for short piece and Application of Primer (1st Coat,
Inspection for Cutting and removal of disposal material upto the rock level near SBC-09 at Zone - B - as
Inspection of Backfilling Sub-grade 1st Layer (1 of 6) around the Manhole (above gravel) for MH-D-06 -
Inspection of Backfilling Sub-grade 1st Layer (1 of 3) around the Manhole (above gravel) for MH-D-03 -
Inspection of Concrete Pouring for the Foundation and Kicker of SBC-08
Pipe Installation of Sub-Surface Drainage (Main Line & Branches) Pipes; (315,250 &110, 160mmØ-U
Pipe Installation of Sub-Surface Drainage (Main Line & Branches) Pipes; (250 &110mmØ-UPVC-CLASS-
Inspection and compaction test 4th layer for backfilling at Zone 2E PC and Strip Footing PC-120-122-124
Level and Location for BUTTRESS BOI 69 (2nd) Zone 2C
Level and Location for MCPE 1 Wall Axis 03-2, 02AP to 03T (as Highlighted) Zone 2N 2M
Concreting for BUTTRESS BOI 69 (2nd) Zone 2C
Shuttering and Shear Connector for BUTTRESS BOI 69 (2nd) Zone 2C
Installation of straight UPVC ducts (Dia 6 inch) Mediam Voltage Duct bank 5X160MM BETWEEN MA
Concreting For MCPE 1 Wall Axis 03-2, 02AP to 03T (as Highlighted) Zone 2N 2M
Shuttering For MCPE 1 Wall Axis 03-2, 02AP to 03T (as Highlighted) Zone 2N 2M
Installation of Rock and Boulder No. RB-170 (4th Layer) (4 of 4)
Installation of Rock and Boulder No. RB-170 (3rd Layer) (3 of 4)
Inpection of Casting Concrete for Short Piece & Surface Preperation prior to start waterproofing and
Installation of Rock and Boulder No. RB-337 (4th Layer) (4 of 8)
Installation of Rock and Boulder No. RB-169a (1st Layer) (1 of 3)
Installation of Rock and Boulder No. RB-170 (2nd Layer) (2 of 4)
Inspection for Casting the Blinding Concrete under the SBC-06 (as Highlighted)
Excavation for Telecommunication Line from (K/TL/22 to K/TL/03) including pit K/TL/22, K/TL/11, K/TL/
Excavation for Fire & Security Distribution Line from (K/FS/07 to K/FS/03) including Pit K/FS/07, K/FS/
Excavation for Storm Water Line from MH-G-01-05 to G-G-69 including Branch and Manhole MH-G-01-0
INSPECTION FOR MANHOLE BASE INSTALLATION AND UPVC PIPE CONNECTION FOR - MH-E-01-1, MH-E-01-
INSPECTION FOR MANHOLE BASE INSTALLATION AND UPVC PIPE CONNECTION FOR - MH-D-01, MH-D-08,
Level and Location for BUTTRESS BII 18, 19 (2ND) Zone 1E
Level and Location for BUTTRESS BOI 70 & 71 (1st) Zone 2C 2D
Steel Reinforcement for BUTTRESS BII BIV 97, 98 Zone 2J 2K
Concreting for BUTTRESS BII 18, 19 (2ND) Zone 1E
Shuttering and Shear Connector for BUTTRESS BII 18, 19 (2ND) Zone 1E
Concreting for BUTTRESS BOI 70 & 71 (1st) Zone 2C 2D
Shuttering and Shear Connector for BUTTRESS BOI 70 & 71 (1st) Zone 2C 2D
Steel Reinforcement for BUTTRESS BOI BOV, BII BIV 62, 63 Zone 2A 2B
Inspection and compaction test 2nd layer for backfilling at Zone 2C Internal BLDG. (as highlighted) Zone 2
Inspection and compaction test 2nd layer for backfilling around Strip footing & PC 180 - 182 (as highlig
Inspection and compaction test 1st layer for backfilling for Zone 1P (as highlighted) Zone 1P SP#121 (1
Repairing of Edges and Curves for Ring Beam Zone 2P at Axis 02-1, 02-AT, 02-AW to close Site Instruct
Pipe Installation for Storm Water Line Outfall-F for (600mmØ-PP-Corrugated) from (MH-F-01 to OUT
Pipe Installation of Potable Water Networks for (200mmØ-UPVC-Class-5). As per highlighted Area in
Pipe Installation of Sub-Surface Drainage (Main Line & Branches) Pipes; (160 &110mmØ-UPVC-CLASS-
Installation Of Straight UPVC DUCTS (Dia 6 inch) Mediam Voltage Duct Bank 5x 160 mm Between Ma
Inspection & Compaction tests of Single Layer Backfilling(Sub-Base) after Sub-Grade laying for S
Inspection & Compaction tests of Single Layer Backfilling (Sub-Grade) after Gravel laying for Sub
Inspection & Compaction tests of 4th Layer (out of 8) Backfilling (Sub-Grade) after Gravel laying
Slated Layer 4mm thk Modified Bituminous Waterproofing membrane for Waterproofing of Foundation &
Protection Layer 4mm thk Bituminous Protection Board for Waterproofing of Foundation & Kicker (Out
Solvent Base Primer Coating prior to Membrane Waterproofing for Foundation of Boundary wall (Oute
Solvent Base Primer Coating prior to Membrane Waterproofing for Foundation of walls (Inner Side) o
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 7 layers) after Gravel la
Excavation & Soil Preparation upto Bottom level of Stone Boulders at Left Side of Water Play Garden,
Level and Location for BUTTRESS BOV 02 Zone 1A
Level and Location for BUTTRESS BOV 11 Zone 1C
Level and Location for BUTTRESS BOV 10 Zone 1C
Level and Location for BUTTRESS BII 65 (2nd 80 CM) Zone 2B
Steel Reinforcement for Ring Beam Zone 2Q Outer Axis 02-2, 02AW to 02AZ
Concreting for BUTTRESS BOV 02 Zone 1A
Shuttering and Shear Connector for BUTTRESS BOV 02 Zone 1A
Concreting for BUTTRESS BOV 10 Zone 1C
Shuttering and Shear Connector for BUTTRESS BOV 10 Zone 1C
Concreting of Buttress BII 65 (2nd) zone 2B
"Inspection of Grouting (Vertical Joints) for Rock Boulder - RB-334 for All Layers"
"Inspection of Grouting (Horizontal Joints) for Rock Boulder - RB-334 for All Layers"
Installation of Rock and Boulder No. RB-337 (3rd Layer) (3 of 8)
Inspection for the Excavation of Storm Box Culvert - SBC-06 (As Highlighted)
"INSPECTION FOR MANHOLE BASE INSTALLATION AND UPVC PIPE CONNECTION FOR - MH-F-01, MH-F-01-1
Shuttering and Shear Connector for BUTTRESS BII 65 (2nd)) Zone 2B (80 CM)
"Inspection and Compaction Test for Backfilling 2nd Layer) for Storm Water Line from MH-D-04 to MH-D-
"Inspection and Compaction Test for Backfilling 4th Layer) for Storm Water Line from MH-D-04 to MH-D-0
"Inspection and Compaction Test for Sub-Base (1 of 1) under Bouder No. RB-244a (Stock Pile # 109 A-1-
Inspection for Sand Bedding under pipe for Telecommunications Line at Zone-K as highlighted in the att
Inspection for Sand Bedding under pipe for Fire & Security Line at Zone-K as highlighted in the attached
Excavation & Soil Preparation for Water Feature Sleeves (3 no's of 315mm Dia.) and Return Pipe line
Excavation & Bed Preparation for Sub surface Drainage Sub lines & Sleeves Pipes (250mm drop to 16
Installation of Rock and Boulder No. RB-170 (1st Layer) (1 of 4)
"Inspection of Grouting (Vertical Joints) for Rock Boulder - RB-263 for All Layers"
"Inspection of Grouting (Horizontal Joints) for Rock Boulder - RB-263 for All Layers"
"Inspection and Compaction Test for Backfilling 1st Layer) for Storm Water Line from MH-D-04 to MH-D-0
"Inspection and Compaction Test for Backfilling 3rd Layer) for Storm Water Line from MH-D-04 to MH-D-0
Inpection of Casting Concrete for Short Piece & Surface Preperation prior to start waterproofing and
Soil Preparation prior to start Cutting and Backfill (-40cm from FGL) at Zone - L - as highlighted
Inspection of Formwork and Level for the Foundation and Kicker of SBC-08
"Inspection of Concrete Pouring for Walls and Top Slab of SBC-05 As Highlighted"
"Inspection of Formwork and Level for Walls and Top Slab of SBC-05 As Highlighted"
"Inspection of Steel reinforcement for Top Slab of SBC-05 As Highlighted"
Excavation for Fire Water Line including Pit F/F/04 at Zone-F as highlighted in the attached drawing
Excavation for Potable Water Line including Pit F/PW/09 & F/PW/07 at Zone-F as highlighted in the att
"Inspection of Concrete Pouring for Walls and Top Slab of SBC-09 As Highlighted"
"Inspection of Steel reinforcement for Top Slab of SBC-09 As Highlighted"
"Inspection of Formwork and Level for Walls and Top Slab of SBC-09 As Highlighted"
Inspection and Compaction Test for 3rd Layer (3 of 4) backfilling (grading) at Zone-5A as highlighted in
Inspection for Casting the Blinding Concrete under the SBC-08 (as Highlighted)
Excavation for Fire & Security Distribution Line from (B/FS/24 to B/FS/36-P2) at Zone-B as highlighted i
"INSPECTION FOR INSTALLATION OF RINGS UP TO BOTTOM OF SLAB FOR (FW-A-3-6.11, FW-A-3-6.12) - A
"INSPECTION FOR MANHOLE BASE INSTALLATION, UPVC PIPE CONNECTION AND CASTING CONCRETE FOR SH
Installation of straight UPVC ducts (Dia 6 inch) Mediam Voltage Duct bank BB/D-MV/18 & BC/D-MV/0
Installation and Survey Report for Location and Levels of Anchor M36 gr. 8.8 & M27 gr. 8.8 and Base Pl
Pipe Sleeve Installation for Strip Footing Pipes (160mmØ & 250mmØ -UPVC-CL-4), At Crescent-2, Zon
Level and Location for MCPE 2 foundation at Axis 03F to 02X (as highlighted) Zone 2G
Level and Location for Zone 2M Outer Ring Beam axis 02-2, 02AL to 02AP (as highlighted)
Steel Reinforcement for BUTTRESS BOI BOV 93, 94, 95, 96 Zone 2J
Shuttering for Zone 2M Outer Ring Beam axis 02-2, 02AL to 02AP (as highlighted)
Protection layer of 4mm thick bituminoud protetcion board for Strip footing Zone 2G (inner) Between
Single layer of 4mm thick modified bituminous water proofing membrane for Strip footing Zone 2G (i
Steel Reinforcement Implant using Approved Material (KAIG3-MAT-GN-S-0099-00) for BOI BII 61, BOI BO
Concreting of MCPE 2 foundation at Axis 03F to 02X (as highlighted) Zone 2G
Shuttering of MCPE 2 foundation at Axis 03F to 02X (as highlighted) Zone 2G
Steel Reinforcement of MCPE 2 foundation at Axis 03F to 02X (as highlighted) Zone 2G
Stack Boulders Installed 2nd layer, along Planted Bed 2 to 3 and above, Inside Water Play Garden, At
Stack Boulders Installed at 2 Places after 5th layer (Part 3), at Bottom side of Planted Bed 1, Inside
Concrete pouring for Blinding of Manholes (6 no's: MH-C-2, MH-C-3, MH-C-8, MH-C-4-1, MH-C-4-2 & M
Excavation & Blinding levels for Manholes (6 no's: MH-C-2, MH-C-3, MH-C-8, MH-C-4-1, MH-C-4-2 & M
Single layer 4mm thk Modified Bituminous Water Proofing Membrane for Foundation & Kicker (Inner Fa
Surface Preparation Prior to Backfilling along the Boundary wall (Outer Side) from Entrance wall At El
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 5 layers) Surround the Light
Solvent Base Primer Coating for Foundation of Boundary wall (Outer Face) @ Grid (16-23/Right Side u
Gravel 3/8 Bedding & Geotextile Surround for Sub surface Drainage Sub line & Sleeves Pipes (2no'
Inspection of Backfilling Sub-grade (1st Layer) around the Manhole (above gravel) for MH-D-04 - as Hig
"Inspection of Grouting (Vertical Joints) for Rock Boulder - RB-244 for All Layers"
"Inspection of Grouting (Horizontal Joints) for Rock Boulder - RB-244 for All Layers"
Soil Preparation under Boulder No. RB- 244a
Inspection and Compaction Test for 12th Layer (12 of 12) backfilling (grading) at Zone-6A as highlighte
Excavation for MV Line FROM B/MV/10 TO B/MV/19 includign Pit B/MV/10, B/MV/19 at Zone-B as highl
Excavation for Fire Water Line (Branch) including PitB/F/08 at Zone-B as highlighted in the attached dra
Excavation for Fire Water Line (Branch) including Pit K/F/01, G/F/04, F/F/07, G/F/18 at Zone-F,G,K as h
Excavation for Potable Water Line (Branch) including Pit F/PW/12 at Zone-F as highlighted in the attac
Excavation for Fire & Security Distribution Line from (K/FS/18 to K/FS/08) including Pit K/FS/18, K/FS/
Excavation for Telecommunication Line from (K/TL/20 to K/TL/11) including pit K/TL/20, K/TL/18, K/TL/
"Inspection and Compaction Test for Sub-Base (1 of 1) under Bouder No. RB-170 (Stock Pile # 109 A-1-A
Installation of UPVC straight conduit (Dia.25mm) and Box for Voice and DATA (Data & TV Outlet) at
Installation and Survey Report for Location and Levels of Anchor and Base Plate for Front Canopy @ BU
Level and Location for BUTTRESS BOI 68 (1st) Zone 2C
Surface Preparation Prior to start Backfilling For Zone 1P (as Highligted)
Inspection and compaction test 1st layer for backfilling around Strip footing & PC 180 - 182 (as highligh
Inspection and compaction test 2nd layer for backfilling around PC 164 (as highlighted) Zone 2L SP#121
Pipe Installation of Sub-Surface Drainage (Main Line & Branches) Pipes; (160 &110mmØ-UPVC-CLASS-
Pipe Installation of Fire Fighting Networks for (250mmØ-UPVC-Class-5). As per highlighted Area in t
Inspection and compaction test 1st layer for backfilling at Zone 2C Internal BLDG. (as highlighted) Zone 2
Shuttering for Plain Concrete of Strip footing Between PC 32-34, 31-33-35-37 at Zone 1F
Concreting for BUTTRESS BIV 18 (2ND) Zone 1E
Concreting for BUTTRESS BOI BOV 18 (1ST) Zone 1E
Steel Reinforcement for RINGBEAM at Zone 2M (outer) Axis 02AL to 02AP, 02-2
Concreting for BUTTRESS BOI 68 (1st) Zone 2C
Shuttering and Shear Connector for BUTTRESS BOI 68 (1st) Zone 2C
Steel Reinforcement for BUTTRESS BOI BOV 97 & 98 Zone 2J 2K
Installation of straight UPVC conduit (Dia.32mm Socket Outlet) for Power at the Crescent -01 (Axis 01
Installation of straight UPVC conduit (Dia. 25mm) and Box for Security (CAM) at the Crescent-01 (Axis 0
Installation of straight UPVC conduit (Dia. 25mm) and Box for Voice and Data (WIFI & CAM) at the Cres
Installation of straight UPVC conduit (Dia. 25mm) and Box for Fire Alarm (Speaker) at the Crescent-01 (
"Inspection of Grouting (Horizontal Joints) for Rock Boulder RB-310 - for All Layers"
"Inspection of Grouting (Horizontal Joints) for Rock Boulder RB-243 - for All Layers"
"Inspection of Grouting (Horizontal Joints) for Rock Boulder RB-317 - for All Layers"
Installation of Rock and Boulder No. RB-061 (4th, 5th & 6th Layer) (6 of 6)
Installation of Rock and Boulder No. RB-334 (3rd Layer) (3 of 3)
"Inspection of Grouting (Vertical Joints) for Rock Boulder RB-242 - for All Layers"
"Inspection of Grouting (Horizontal Joints) for Rock Boulder RB-242 - for All Layers"
Installation of Rock and Boulder No. RB-263 (4th Layer) (4 of 4)
Installation of Rock and Boulder No. RB-263 (3rd Layer) (3 of 4)
Installation of Rock and Boulder No. RB-334 (2nd Layer) (2 of 3)
Inspection for Sand Bedding under pipe for Potable Water Line at Zone-G & K as highlighted in the attac
Inspection for Sanding Bedding for Fire Water Line at Zone- F as highlighted in the attached drawing (SP
Inspection of Backfilling Sub-grade (2nd Layer) around the Manhole (above gravel) for MH-D-01-A1 - as
Surface Preparation for Storm Water Line from MH-D-04 to MH-D-04-01 prior to start back filling (as Hi
Surface Preparation for Storm Water Line from MH-D-04 to MH-D-05, prior to start back filling (as Highl
Inspection of Backfilling Sub-grade (2nd Layer) around the Manhole (above gravel) for FW-A-17 - as Hig
Inspection of Backfilling Sub-grade (1st Layer) around the Manhole (above gravel) for FW-A-16 - as Hig
"Inspection of Backfilling Gravel (5th Layer) around the Manhole for MH-D-06, MH-D-08-01 - as Highlig
"Inspection of Backfilling Gravel (4th Layer) around the Manhole for MH-D-03, MH-D-06, MH-D-08-01 -
"Inspection and Compaction Test for Sub-Base (1 of 1) under Bouder No. RB-169a (Stock Pile # 109 A-1-
Inspection and Compaction Test for 11th Layer (11 of 12) backfilling (grading) at Zone-6A as highlighte
Surface Preparation prior to Waterproofing for Foundation of Boundary wall (Outer Side) of Whisperi
Inspection of Sand bedding for Conduits (3 no's of 75mm) Laying for Normal Lighting Circuits, at Right
Bed Preparation for N.G.L Before Backfilling, at Top Right side, inside Geyser Garden, At Highlighted
Level and Location for 1st layer mass concrete of Strip footing between PC 146-148-150 Zone 2J (as high
Level and Location for BUTTRESS BOI BOV 19 (1st) Zone 1E
Level and Location for BUTTRESS BII 8 & 9 (1st) Zone 1C 1D
Level and Location for MCPE 2 foundation at Axis 03J to 02AB (as highlighted) Zone 2G 2H
Level and Location for MCPE 3 wall at axis 02R to 02Q (as highlighted) Zone 2E 2F
Surface Preparation Prior to start Backfilling Between PC 180 to 182 Zone 2N (as Highligted)
Concreting for 1st layer mass concrete of Strip footing between PC 146-148-150 Zone 2J (as highlighted)
Shuttering for 1st layer mass concrete of Strip footing between PC 146-148-150 Zone 2J (as highlighted)
Anti Termite application under Strip footing between PC 146-148-150 Zone 2J (as highlighted)
Concreting for BUTTRESS BOI BOV 19 (1st) Zone 1E
Shuttering for BUTTRESS BOI BOV 19 (1st) Zone 1E
Concreting for BUTTRESS BII 8 & 9 (1st) Zone 1C 1D
Shuttering and Shear Connector for BUTTRESS BII 8 & 9 Zone 1C 1D
Concreting of MCPE 2 foundation at Axis 03J to 02AB (as highlighted) Zone 2G 2H
Shuttering of MCPE 2 foundation at Axis 03J to 02AB (as highlighted) Zone 2G 2H
Steel Reinforcement of MCPE 2 foundation at Axis 03J to 02AB (as highlighted) Zone 2G 2H
Concreting of MCPE 3 Wall at Axis 02R to 02Q (as highlighted) Zone 2E
Shuttering of MCPE 3 Wall at Axis 02R to 02Q (as highlighted) Zone 2E
Surface Preparation and Solvent Base Primer under Strip footing between PC 34-36-38-40-42-44 Zon
Pipe Installation of Foul Water Line for (110mmØ-UPVC- Class 4) from (FW-A-13-4 to Garden of Origi
Bedding of Gravel 3/8" and Geotextile surrounding Foul Water Line for (110mmØ-UPVC- Class 4) fro
Pipe Installation of Sub-Surface Drainage Main Line Pipes; (450mmØ-UPVC-CLASS-4) & Branches (1
Stack Boulders Installed 3rd layer upto Level +877.50 (Part 5), Between Geyser Garden & Boundary wa
1st & 2nd Coat Damp proofing for Boundary wall foundation (Inner Face) at Elevation "C, D & E" and (A
Coordinates & Levels for Blinding of Boundary wall @ Grid (11-16/Right Side), of Aviary garden, At Hi
Surface preparation prior to water proofing for Foundation of Boundary wall (Outer Face) @ Grid (16-
Surface preparation prior to Waterproofing for footing & Kicker of Circular Wall (1, 2, 3, 4, 5, 6 & 7)
Concrete pouring & Shuttering for Footing at Grid (2-20/B) Inside Butterfly Garden, as highlighted ar
Coordinates & Levels for Footing at Grid (2-20/B) Inside Butterfly Garden, as highlighted area in atta
Installation and Fixation of Base plates & Anchor Bolts and Check Coordinates & Levels for Footing at
Level and Location for BUTTRESS BOV 8 & 9 Zone 1C 1D
Level and Location for Strip Footing between PC 38-40-42-44 Zone 1G (as highlighted)
Level and Location for BUTTRESS BOV BIV 01 Zone 1A
Inspection and compaction test 1st layer for backfilling around PC 164 (as highlighted) Zone 2L SP#121 (
Concreting for BUTTRESS BOV 70 & 71 Zone 2C
Concreting for BUTTRESS BOV 8 & 9 Zone 1C 1D
Concreting for BUTTRESS BOV BIV 01 Zone 1A
Shuttering and Shear Connector for BUTTRESS BOV BIV 01 Zone 1A
Installation of Rock and Boulder No. RB-263 (2nd Layer) (2 of 4)
Installation of Rock and Boulder No. RB-337 (2nd Layer) (2 of 8)
Concreting for BUTTRESS BOI 12 & 13 Zone 1C 1D
Installation of Rock and Boulder No. RB-334 (1st Layer) (1 of 3)
Installation of Rock and Boulder No. RB-263 (1st Layer) (1 of 4)
Shuttering and Shear Connector for BUTTRESS BOV 8 & 9 Zone 1C 1D
Inspection and Compaction Test for 10th Layer (10 of 12) backfilling (grading) at Zone-6A as highlighte
Inspection and Compaction Test for 1st Layer (1 of 1) Backfilling under Bouder No. RB-169a (Stock Pile #
Soil Preparation under Boulder No. RB- 169a
Soil Preparation under Boulder No. RB- 170
Concreting for Strip Footing between PC 38-40-42-44 Zone 1G (as highlighted)
Shuttering for Strip Footing between PC 38-40-42-44 Zone 1G (as highlighted)
Steel Reinforcement for Strip Footing between PC 38-40-42-44 Zone 1G (as highlighted)
Single layer of 4mm thick modified bituminous waterproofing membrane under Strip footing between
Surface preparation and Solvent base primer under Strip footing between PC 31-33-35-37-39-41-43 Zon
Protection layer of 4mm thick bituminous protection board for Strip footing between PC 120-122-124-
Single layer of 4mm thick modified bituminous water proofing membrane for Strip footing between PC
Installation of straight UPVC conduit (Dia.6 inch.) Medium Voltage Duct Bank (B/RC-MV/3) at the Nort
Check levels for Bottom of Stone Boulders Inside Water Play Garden, at Top side of Planted bed 1, At
Excavation & Surface Preparation for Low Voltage Duct Banks Going to Water Play Garden, Inside Wat
Inspection & Compaction tests after Excavation for Plant Room & Boundary wall @ Grid (11-16/Right Si
Excavation & Surface Preparation for Plant Room & Boundary wall @ Grid (11-16/Right Side), of Aviary
Gravel 3/8 Bedding & Geotextile Surround for Sub surface Drainage Sub line & Sleeves Pipes (160m
Protection Layer 4mm thk Bituminous Protection Board for Foundation & Kicker of Boundary wall (Inn
Sleeve Installation & Concrete Pouring for Encasement of Sleeve Pipes (2 no's of 200mm Dia.) for Wat
Steel Reinforcement for Footing at Grid (2-20/B) Inside Butterfly Garden, as highlighted area in attac
Installation of Rock and Boulder No. RB-244 (4th Layer) (4 of 4)
Installation of Rock and Boulder No. RB-242 (4th Layer) (4 of 4)
"Inspection of Grouting (Vertical Joints) for Rock Boulder RB-335 - for All Layers"
"Inspection of Grouting (Horizontal Joints) for Rock Boulder RB-335 - for All Layers"
Inspection of Backfilling Gravel (1st. 2nd, 3rd & 4th Layer) around the Manhole for MH-D-01-B1 - as Hig
Inspection of Backfilling Gravel (4th Layer) around the Manhole for MH-D-05 - as Highlighted (SP# 118)
"Inspection of Backfilling Gravel (1st, 2nd & 3rd Layer) around the Manhole for MH-D-03, MH-D-04,
Inspection of Formwork and Level for the Foundation and Kicker of SBC-08
Steel Reinforcement Inspection for the Foundation and Side Walls of SBC-08
Excavation for MV Line FROM B/MV/19 TO B/MV/13 includign Pit B/MV/19, B/MV/06, B/MV/13 at Zone-
Excavation for Telecommunication Line from (B/TL/21 to B/TL/36-P2) at Zone-B as highlighted in the at
Excavation for Telecommunication Line from (B/TL/21 to B/TL/36) at Zone-B as highlighted in the attac
Inspection for Casting the Concrete Encasement for the Storm Water Line inside management building (
Level and Location for BUTTRESS BOI 97, 98 Zone 2J 2K
Level and Location for BUTTRESS BOV 70 & 71 Zone 2C
Steel Reinforcement for BUTTRESS BII BIV 03 Zone 1A
Concreting for BUTTRESS BOI 97, 98 Zone 2J 2K
Shuttering and Shear Connector for BUTTRESS BOI 97, 98 Zone 2J 2K
Steel Reinforcement for BUTTRESS BII BIV 02 Zone 1A
Shuttering and Shear Connector for BUTTRESS BOV 70 & 71 Zone 2C
Inspection and compaction test 13th layer for backfilling around Strip footing and PC 110-112 (as highl
Inspection and compaction test 6th layer for backfilling around PC 160-162 (as highlighted) Zone 2L SP#
Inspection and compaction test 4th layer for backfilling around Strip footing and PC 176 - 178 (as highl
Excavation & Bed Preparation for Sub surface Drainage Main & Sub line Pipes (250mm pipe connecting
Installation of Rock and Boulder No. RB-242 (3rd Layer) (3 of 4)
Excavation for MV Line FROM B/MV/21 TO B/MV/12 includign Pit B/MV/21, B/MV/09, B/MV/12 at Zone-
Inspection & Compaction Tests for 1st Layer Backfilling (Sub-Grade) (Out of 3 Layers) Inside Back of H
Inspection and Compaction Test for 9th Layer (9 of 12) backfilling (grading) at Zone-6A as highlighted i
Primer Coating Prior to Damp proofing for Boundary wall foundation (Inner Face) at Elevation "C, D &
Inspection for Sand Bedding under MV Line from B/MV/18 to B/MV/07 at Zone-B as highlighted in the at
Protection layer of 4mm thk Bituminous Protection Board for Boundary wall Foundation & Kicker (Inn
Inspection for Sand Bedding under pipe for Fire Water Line at Zone - K as highlighted in the attached dr
Concrete Pouring & Shuttering for Kicker (2nd Lift) of 2 Walls (Curved) along the Boundary wall at En
INSPECTION FOR MANHOLE BASE INSTALLATION AND UPVC PIPE CONNECTION FOR - MH-D-01, MH-D-08,
Inspection of Backfilling Sub-grade (1st Layer) around the Manhole (above gravel) for FW-A-16 & FW-A-
Inspection of Backfilling Sub-grade (1st Layer) around the Manhole (above gravel) for MH-D-01-A1, M
"Inspection of Backfilling Gravel (3rd Layer) around the Manhole for FW-A-16 - as Highlighted (SP# 118)
"Inspection of Backfilling Gravel (1st & 2nd Layer) around the Manhole for FW-A-16 & FW-A-17 - as Hig
"Inspection of Backfilling Gravel (3rd & 4th Layer) around the Manhole for MH-D-01-A1, MH-D-01-A2,
Inspection for Sand Bedding under MV Line from B/MV/17 to B/MV/26 at Zone-B as highlighted in the at
Level and Location for BUTTRESS BII 4, 5, 6 (2ND) Zone 1A 1B
Level and Location for BUTTRESS BIV 19 (2ND) Zone 1E
Level and Location for BUTTRESS BOV 11, BIV 11 & 10 Zone 1C
Concreting for BUTTRESS BII 4, 5, 6 (2ND) Zone 1A 1B
Shuttering and Shear Connector for BUTTRESS BII 4, 5, 6 (2ND) Zone 1A 1B
Concreting for BUTTRESS BIV 19 (2ND) Zone 1E
Shuttering and Shear Connector for BUTTRESS BIV 19 (2ND) Zone 1E
Concreting for BUTTRESS BOV 11, BIV 11 & 10 Zone 1C
Shuttering and Shear Connector for BUTTRESS BOV 11, BIV 11 & 10 Zone 1C
Gravel 3/8 Bedding & Geotextile Surround for Sub surface Drainage Main line (Pipe Dia 450mm from M
Excavation & Bed Preparation for Conduits (3 no's of 75mm) Laying for Normal Lighting Circuits, at Ri
Excavation & Bed Preparation for Sub surface Drainage Sub line & Sleeves Pipes (160mm & 110mm c
Concrete pouring for Blinding of Manholes (10 no's: MH-C-1, MH-C-4, MH-C-5, MH-C-6, MH-C-7, MH-C
Excavation & Blinding levels for Manholes (10 no's: MH-C-1, MH-C-4, MH-C-5, MH-C-6, MH-C-7, MH-C
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Base) (Out of 2 layers) after Gravel layin
Surface preparation prior to start Backfilling surround the Manholes (Type 'A' 1 No's & 'B' 1 no's)(
Single layer 4mm thk Modified Bituminous Water Proofing Membrane for Foundation & Kicker (Outer F
Inspection of Spatter Dash (Rough Coat) Prior to External Plastering at Elevation of Grid (12-17/W) a
Aluminium Flashing & Sealant for water proofing on Foundation of Boundary wall (Outer Side) of Whi
Slated Layer 4mm thk Modified Bituminous Waterproofing membrane for Foundation of Boundary wall
Aluminium Flashing & Sealant for water proofing on Foundation (Outer Face) of Outer Canopy 3, at ou
Single layer 4mm thk Modified Bituminous Water Proofing Membrane for Boundary wall Foundation & K
Stack Boulders Installed 1st layer upto Level +875.30, along Planted Bed 2 to 3 and above, Inside Wa
Stack Boulders Installed 2nd layer upto Level +877.05 (Part 5), Between Geyser Garden & Boundary w
Stack Boulders Installed 5th layer upto Level +877.60 (Part 3), at Bottom side of Planted Bed 1, Insi
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 2 layers) after Gravel layi
Installation of Rock and Boulder No. RB-063 (3rd Layer) (3 of 5)
Installation of Rock and Boulder No. RB-169b (2nd Layer) (2 of 4)
Installation of Rock and Boulder No. RB-242 (2nd Layer) (2 of 4)
Installation of Rock and Boulder No. RB-337 (1st Layer) (1 of 8)
Installation of Rock and Boulder No. RB-244 (3rd Layer) (3 of 4)
INSPECTION FOR MANHOLE BASE INSTALLATION AND UPVC PIPE CONNECTION FOR - MH-H-01, MH-H-02,
Excavation for MV Line FROM G/MV/29 TO G/MV/17 includign Pit G/MV/29, G/MV/07, G/MV/06, G/MV/1
"Inspection of Concrete Pouring for Walls and Top Slab of SBC-05 As Highlighted"
"Inspection of Formwork and Level for Walls and Top Slab of SBC-05 As Highlighted"
"Inspection of Steel reinforcement for Top Slab of SBC-05 As Highlighted"
Inspection and Compaction Test for 8th Layer (8 of 12) backfilling (grading) at Zone-6A as highlighted i
Inspection for Sand Bedding under pipe for Fire Water Line at Zone-F,G&K as highlighted in the attached
Notification to Start Cutting and Removal of disposal materials upto rock layer and Refill with approve
Excavation for Fire Water Line at Zone-K as highlighted in the attached drawing
Excavation for Potable Water Line including Pit - K/PW/09 at Zone-K as highlighted in the attached draw
Level and Location for BUTTRESS BIV 101 & 102 Zone 2K 2L
Level and Location for Infill Wall Between Buttress BO 113 -114 at Zone 2N (as highlighted) as per KA
Level and Location for BUTTRESS BOI 69 (1st) Zone 2C
Concreting for BUTTRESS BOI 69 (1st) Zone 2C
Shuttering and Shear Connector for BUTTRESS BOI 69 (1st) Zone 2C
Concreting for BUTTRESS BIV 101 & 102 Zone 2K 2
Shuttering and Shear Connector for BUTTRESS BIV 101 & 102 Zone 2K 2
Concreting for Infill Wall Between Buttress BO 113 -114 at Zone 2N (as highlighted)
Shuttering and Shear Connector for Infill Wall Between Buttress BO 113 -114 at Zone 2N (as highlighted)
"Inspection of Grouting (Vertical Joints) for Rock Boulder RB-309 - for All Layers"
"Inspection of Grouting (Horizontal Joints) for Rock Boulder RB-309 - for All Layers"
Excavation for Fire Water Line including Pit F/F/04 at Zone-F as highlighted in the attached drawing
Excavation for Potable Water Line including Pit F/PW/09 & F/PW/07 at Zone-F as highlighted in the att
Inspection for Sand Bedding under pipe for Potable Water Line at Zone-B as highlighted in the attached
Inspection for Sand Bedding under pipe for Fire Water Line at Zone-B as highlighted in the attached draw
Inspection for Casting the Blinding Concrete under the SBC-08 (as Highlighted)
Inspection and Compaction test for Sanding Bedding for Fire Water Line at Zone-B as highlighted in the
Installation of stub-up UPVC conduit (Dia. 25mm: 2Pcs each Speaker) for Fire Alarm at the Crescent-
Surface Preparation Prior to start Backfilling at PC 164 Zone 2L (as Highligted)
Inspection and compaction test 12th layer for backfilling around Strip footing and PC 110-112 (as highl
Inspection and compaction test 3rd layer for backfilling around Strip footing and PC 176 - 178 (as highl
Inspection and compaction test 4th layer for backfilling around Strip footing and PC 166-168, 170-172-
Surface Preparation and Solvent Base Primer for Strip footing Zone 2G (inner) Between PC 134-136-138
Surface Preparation and Solvent Base Primer for Strip footing between PC 120-122-124-126 Zone 2E
Concreting for BUTTRESS BIV 04 & 05 (2nd) Zone 1A 1B
Shuttering and Shear Connector for BUTTRESS BIV 04 & 05 (2nd) Zone 1A 1B
Concreting for INFILL WALL Between Buttress outer 114-115 Axis 02-2, 02AR to 02AS Zone 2N
Concreting for BUTTRESS BII BIV 19 (1st) Zone 1E
Shuttering for BUTTRESS BII BIV 19 (1st) Zone 1E
Level and Location of Excavation for Strip footing in Zone 2J Between PC 146-148-150-152 (as highlighte
Steel Reinforcement for Counter Fort Wall for Infill Wall Between Buttress BO 113 -114 at Zone 2N (as h
Steel Reinforcement for BUTTRESS BII 7, 8, 9 Zone 1B 1C
Warning Tape Installation for Storm Water Line Outfall-F for (450mmØ-UPVC- Class 4) from (MH-F-0
300 mm Gravel 3/8" Backfilling and Geotextile for Storm Water Line Outfall-F for (450mmØ-UPVC- C
Pipe Installation for Storm Water Line Outfall-F for (600mmØ-PP-Corrugated) from (MH-F-01 to OUT
Bedding of Gravel 3/8" and Geotextile surrounding Storm Water Line Outfall-F for (600mmØ-PP-Cor
Inspection & Compaction tests after Excavation for Water Feature Sleeves (2 no's of 200mm Dia.) bes
Stone Cladding for Boundary wall (Inner & Outer Faces) at Elevation "A" @ Sound & Light Garden, As
Excavation & Soil Preparation for Water Feature Sleeves (2 no's of 200mm Dia.) beside Plant Room, Pa
Concrete Pouring & Shuttering for Kicker (2nd Lift) of Straight Wall (Right Side) at Entrance, inside M
Coordinates & Levels for Kicker (2nd Lift) of Straight Wall (Right Side) at Entrance, inside Maze garde
Coordinates & Levels for Walls of 2 (Curved) walls along the Boundary wall at Entrance, inside Maze g
Concrete Pouring & Shuttering for Walls of 2 (Curved) walls along the Boundary wall at Entrance, insi
Protection Layer 4mm thk Bituminous Protection Board. for Foundation of Boundary wall (Outer Side)
Concrete pouring & Shuttering for Slab & Beams of Plant Room at Discovery Garden at highlighted ar
Coordinates & Levels for Slab & Beams of Plant Room at Discovery Garden at highlighted area in atta
2nd Coat Cementitious Waterproofing for Kicker & Wall of Circular Wall (10) (Inner Side) and Circular W
Surface preparation prior to Waterproofing and Application of Primer coating, 1st & 2nd Coats of D
Excavation for Car Park Tree Pit as Details D-38-1, as highlighted in the attached drawing
"Inspection of Grouting (Vertical Joints) for Rock Boulder RB-311 - for All Layers"
"Inspection of Grouting (Horizontal Joints) for Rock Boulder RB-311 - for All Layers"
Inspection and Compaction Test for 7th Layer (7 of 12) backfilling (grading) at Zone-6A as highlighted i
"Excavation for Foul Water Line Branches of FW-A-23, FW-A-22, FW-A-21, FW-A-20, FW-A-19, FW-A-18 pr
Excavation for Potable Water Line at Zone-G including Pit G/PW/07 as highlighted in the attached drawi
Excavation for Fire Water Line including Pit G/F/05 at Zone-G as highlighted in the attached drawing
Inspection of Concrete Pouring for the Foundation and Kicker of SBC-06
Excavation for Fire & Security Distribution Line from (B/FS/24 to B/FS/36-P2) at Zone-B as highlighted i
Excavation for Fire & Security Distribution Line from (B/FS/24 to B/FS/36) at Zone-B as highlighted in t
Inspection and compaction test 5th layer for backfilling around PC 160-162 (as highlighted) Zone 2L SP#
Inspection and compaction test 3rd layer for backfilling around Strip footing and PC 168-170, 172-174-
Level and Location for Strip footing Plain Concrete between PC 180 - 182 Zone 2N (as highlighted) as p
Concreting for Strip footing Plain Concrete between PC 180 - 182 Zone 2N (as highlighted) as per SCR-S
Shuttering for Strip footing Plain Concrete between PC 180 - 182 Zone 2N (as highlighted) as per SCR-S
Anti Termite Appication under Strip footing Plain Concrete between PC 180 - 182 Zone 2N (as highlight
Steel Reinforcement for BUTTRESS BOI BOV 2 Zone 1A
Pipe Sleeve Installation for Strip Footing Pipes (160mmØ & 250mmØ -UPVC-CL-4), At Crescent-2, Zon
Installation of straight UPVC conduit (Dia. 32mm& 25mm) and Box for Security (CAM) at the Physic Gar
Installation of straight UPVC conduit (Dia. 32mm & 25mm) and Box for Voice and DATA (WIFI & CAM) at
Installation of straight UPVC conduit (Dia. 32mm) and Box for Fire Alarm (Speaker) at the Physic Garden
Excavation for Potable Water Line at Zone-G & K including Pit K/PW/08 as highlighted in the attached d
Excavation for Fire Water Line at Zone-G & K as highlighted in the attached drawing
Excavation for Potable Water Line at Zone-K including Pit K/PW/02 as highlighted in the attached drawi
Excavation for Fire Water Line including Pit K/F/02 at Zone-K as highlighted in the attached drawing
Excavation for Fire Water Line at Zone-K as highlighted in the attached drawing
Excavation for Potable Water Line at Zone-K as highlighted in the attached drawing
Steel Reinforcement Inspection for the Foundation and Side Walls of SBC-06
Excavation for Fire Water Line at Zone-K as highlighted in the attached drawing
Excavation for Potable Water Line including Pit - K/PW/12 at Zone-K as highlighted in the attached draw
Inspection for Casting the Concrete Encasement for the Storm Water Line inside management building (
"Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-K (Seating
"Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-K (Seating
Inpection of Casting Concrete for Short Piece & Surface Preperation prior to start waterproofing an
"Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-G (Seating
"Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-G (Seating
"Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-G (Seating
"Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-G (Seating
"Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-G (Seating
"Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-G (Seating
"Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-G (Seating
"Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-G (Seating
Steel Reinforcement for Slab & Beams of Plant Room at Discovery Garden at highlighted area in atta
Steel Reinforcement for Footing at Grid (2-20/B) Inside Butterfly Garden, as highlighted area in attac
Inspection & Compaction tests of 5th Layer (out of 8) Backfilling (Sub-Grade) for Sub surface D
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 4 layers) for Sub surfa
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 6 layers) for Sub surfac
Inspection & Compaction tests of 2nd Layer Backfilling (Sub-Grade) (Out of 7 layers) for Sub surfa
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 7 layers) after Gravel la
Inspection of Plastering for Internal walls Inside Stores (GF-5017, 5019, 5021 & 5026) and Water He
Inspection of Plaster Guide Points and Plaster Accessories prior to start Spatter Dash (Rough Coat) fo
Plaster Guide Points & Accessories for Internal walls Inside Janitor Closet room (GF-5033) and Toile
1st Coat Cementitious Waterproofing for Kicker & Wall of Circular Wall (10) (Inner Side) and Circular Wa
Concrete pouring & Shuttering for Ring Beam @ Grid (17-23/Right Side upto B.O.H) on Boundary wall
Installation and Fixation of Base plates & Anchor Bolts and Check Coordinates & Levels for Ring Beam
Coordinates & Levels for Ring Beam @ Grid (17-23/Right Side upto B.O.H) on Boundary wall at Aviary
Inspection and compaction test 11th layer for backfilling around Strip footing and PC 110-112 (as highl
Inspection and compaction test 2nd layer for backfilling around Strip footing and PC 176 - 178 (as highl
Inspection and compaction test 3rd layer for backfilling around Strip footing and PC 166-168, 170-172
Inspection and compaction test 1st layer for backfilling at Zone 2C Internal BLDG. (as highlighted) Zone
Surface Preparation Prior to start Backfilling at Zone 2C internal Buildings (as Highligted)
Level and Location for BUTTRESS BOI 6 Zone 1B
Concreting for BUTTRESS BIV 7 (2nd) Zone 1B
Concrerting for BUTTRESS BIV 8 & 9 Zone 1B 1C
Protection layer of 4mm thick bituminous protection board for Strip footing Between PC 96-98, 91-93-
Geotextile and 30mm screed under Strip footing between PC 34-36-38-40-42-44 Zone 1F 1G
Single layer of 4mm thick modified bituminous WP membrane under Strip footing between PC 34-36-3
Concreting for BUTTRESS BOI 6 (2nd) Zone 1B
Shuttering and Shear Connector for BUTTRESS BOI 6 (2nd) Zone 1B
Installation of straight UPVC conduit (Dia.32mm) and Box for Power (Twin Socket & FO Copper Converte
Installation of Rock and Boulder No. RB-242 (1st Layer) (1 of 4)
Installation of Rock and Boulder No. RB-255 (1st Layer) (1 of 4)
Inspection and compaction test 10th layer for backfilling around Strip footing and PC 110-112 (as highl
Excavation for MV Line FROM B/MV/13 TO G/MV/29 includign Pit B/MV/13, G/MV/22, G/MV/29 at Zone
Inspection and compaction test 4th layer for backfilling around PC 162 (as highlighted) Zone 2L SP#121
Excavation for Non-Potable Water Line at Zone-G & K as highlighted in the attached drawing
Inspection and Compaction Test for 6th Layer (6 of 12) backfilling (grading) at Zone-6A as highlighted i
Inspection and compaction test 1st layer for backfilling around Strip footing and PC 176 - 178 (as highli
Inspection and Compaction Test for 4th Layer (4 of 4) backfilling (grading) at Zone-5A as highlighted in
Casting Blinding Concret under Manhole MH-F-01, MH-F-02, MH-F-03, MH-F-04 and Gullies G-F-01, G-F-02
Excavation for Fire Water Line including Pit F/F/07, F/F/06, F/F/05 at Zone-F as highlighted in the attac
Installation and Survey Report for Location and Levels of Anchor and Base Plate for Front Canopy @ BU
Level and Location for Plain Concrete of Strip footing Between PC 32-34, 31-33-35-37 at Zone 1F
Excavation for Potable Water Line at Zone-F as highlighted in the attached drawing
Excavation for Potable Water Line at Zone-B as highlighted in the attached drawing
Excavation for Fire Water Line at Zone-B as highlighted in the attached drawing
Level and Location for BUTTRESS BOV 97, 98 & BIV 100 Zone 2J 2K
Excavation for Fire Water Line at Zone-B as highlighted in the attached drawing
Level and Location for BUTTRESS BII 4 & 5 Zone 1A 1B
Level and Location for BUTTRESS BOI BOV 18 (1ST) Zone 1E
Level and Location for BUTTRESS BIV 18 (2ND) Zone 1E
Concreting for Plain Concrete of Strip footing Between PC 32-34, 31-33-35-37 at Zone 1F
Shuttering for Plain Concrete of Strip footing Between PC 32-34, 31-33-35-37 at Zone 1F
Pipe Installation of Sub-Surface Drainage Main Line Pipes; 315mmØ, 160mmØ & 110mm Ø- UPVC-CLAS
Stone Cladding for Boundary wall (Inner Face) @ Span 46 of Water Garden, at Highlighted area in At
Concrete pouring & Shuttering for Kicker (2nd lift) of Whispering Cave 1 & 2, @ Sound & Light Garden
Anti Termite Under Strip footing Between PC 32-34, 31-33-35-37 at Zone 1F
Slated Layer 4mm thk Modified Bituminous Waterproofing membrane for Foundation (Outer Face) of Ou
Concreting for BUTTRESS BOV 97, 98 & BIV 100 Zone 2J 2K
Protection Layer 4mm thk Bituminous Protection Board for Waterproofing of Foundation (Outer Face)
Surface Preparation prior to Waterproofing for Foundation of wall (Inner Side) of Whispering Cave 2
Shuttering and Shear Connector for BUTTRESS BOV 97, 98 & BIV 100 Zone 2J 2K
Concrete Pouring & shuttering for Slab & Beam of Whispering Cave 1, @ Sound & Light Garden, At hig
Coordinates & levels for Slab & Beam of Whispering Cave 1, @ Sound & Light Garden, At highlighted
Concrerting for BUTTRESS BII 4 & 5 Zone 1A 1B
Shuttering and Shear Connector for BUTTRESS BII 4 & 5 Zone 1A 1B
Concreting for BUTTRESS BOI BOV 18 (1ST) Zone 1E
Shuttering for BUTTRESS BOI BOV 18 (1ST) Zone 1E
Concreting for BUTTRESS BIV 18 (2ND) Zone 1E
Shuttering and Shear Connector for BUTTRESS BIV 18 (2ND) Zone 1E
Installation of straight UPVC conduit (Dia.32mm Socket Outlet) for Power at the Crescent -01 (Axis 0
Installation of straight UPVC conduit (Dia. 25mm) and Box for Fire Alarm (Speaker) at the Crescent-01 (
Installation of Cable Tray and Trunking for Low Current (LC5- 600mm grid no.15/F to 15P,15P to 16
Installation and Survey Report for Location and Levels of Anchor M36 gr. 8.8 & M27 gr. 8.8 and Base Pl
Installation and Survey Report for Location and Levels of Anchor and Base Plate for Front Canopy @ BUT
Surface preparation prior to Waterproofing for footing & Kicker of Circular Wall (10) (Inner Side) and C
Surface preparation prior to Stone Cladding for walls (All Side) of Circular Walls (8, 9 & 10) Half Part
Steel Reinforcement for Wall of 2 (Curved) walls along the Boundary wall at Entrance, inside Maze gar
Steel Reinforcement for Slab & Beam of Whispering Cave 1, @ Sound & Light Garden, At highlighted
Screed Protection 50mm thk. on Blinding under foundation at Grid (A/12-16) & (A-B/14) @ Butterfly G
Geo-Textile Protection Layer on Blinding under foundation at Grid (A/12-16) & (A-B/14) @ Butterfly G
Single Layer Water proofing membrane 4mm thk. on Blinding under foundation at Grid (A/12-16) & (A-
Level and Location for BUTTRESS BOI 12 & 13 Zone 1C 1D
Level and Location for BUTTRESS BII 6 Zone 1B
Level and Location for Ring Beam @ Zone 2P (outer) Between Axis 02-2, 02AT to 02AW
Concreting for BUTTRESS BOI 12 & 13 Zone 1C 1D
Shuttering and Shear Connector for BUTTRESS BOI 12 & 13 Zone 1C 1D
Concreting for BUTTRESS BII 6 Zone 1B
Shuttering and Shear Connector for BUTTRESS BII 6 Zone 1B
Concreting for Ring Beam @ Zone 2P (outer) Between Axis 02-2, 02AT to 02AW
Shuttering for Ring Beam @ Zone 2P (outer) Between Axis 02-2, 02AT to 02AW
Steel Reinforcement for RINGBEAM at Zone 2P (outer) Axis 02AT to 02AW, 02-2
Inspection of Internal Plastering for walls Inside First Aid (GF-5069) & Office (GF-5067) at Grid (3-4
Installation of Rock and Boulder No. RB-244 (2nd Layer) (2 of 4)
Soil Preparation at Zone - 6A after Cutting - as highlighted
Excavation for MV Line FROM B/MV/19 TO B/MV/13 includign Pit B/MV/19, B/MV/06, B/MV/13 at Zone-
Inspection and Compaction Test for Sub-Base (1 of 1) under Bouder No. RB-337 (Stock Pile # 109 A-1-A)
"Inspection and Compaction Test for Backfilling (10th Layer) for Storm Water Line from MH-D-03 to MH-D
"Inspection and Compaction Test for Backfilling (9th Layer) for Storm Water Line from MH-D-08-01 to MH
Inspection of Formwork for the Foundation and Kicker of SBC-06
Inpection of Casting Concrete for Short Piece & Surface Preperation prior to start waterproofing and
"Inspection of Formwork for the Foundation of Seating Area (3) at Zone-I (SA-18) As Highlighted"
Inspection and Compaction Test 3rd Layer for Backfilling around Strip Footing and PC 145-147-149 as h
Gravel 3/8 Bedding & Geotextile Surround for Sub surface Drainage Main line & Sleeves Pipes (250m
Inspection & Compaction tests of 4th Layer (out of 8) Backfilling (Sub-Grade) after Gravel laying f
Steel Reinforcement for Ring Beam & Remaining part of Wall @ Grid (16-23/Right Side upto B.O.H) or
Mockup for Stone Coping for all External Gardens Installed on Boundary wall of Discovery Garden at h
Existing Levels Prior to Excavation for Stone Boulders Left Side of Water Play Garden, At Highlighted
Stack Boulders Installed 1st layer upto Level +876.65 (Part 5), Between Geyser Garden & Boundary wa
Concrete Pouring & Shuttering for Footing of Circular wall (10) Half part 2, Remaining part near Entra
Concrete pouring for Encasement of Pipes for Manholes (4 no's) (MH-D-09-01, MH-D-09-02, MH-D-09-0
"Inspection of Concrete Pouring for Walls and Top Slab of SBC-09 As Highlighted"
"Inspection of Steel reinforcement for Top Slab of SBC-09 As Highlighted"
"Inspection of Formwork and Level for Walls and Top Slab of SBC-09 As Highlighted"
Inspection and Compaction Test for 3rd Layer (3 of 4) backfilling (grading) at Zone-5A as highlighted in
Surface Preparation Prior to Start Backfill Gravel around the Manhole for - FW-A-16, FW-A-17, FW-A-25
Inspection and Compaction Test for 2nd Layer (2 of 2) Backfilling under Bouder No. RB-337 (Stock Pile #
Surface Preparation Prior to start Backfilling at Strip footing and PC between PC 166-168-170-172-174
Level and Location of Excavation for Strip footing in Zone 1P Between PC 83-85, 87-89 (as highlighted)
Level and Location of Plain Concrete for Strip footing in Zone 1P Between PC 83-85, 87-89 (as highlighte
Level and Location for BUTTRESS BOI 4 & 5 Zone 1A 1B
Concreting of Plain Concrete for Strip footing in Zone 1P Between PC 83-85, 87-89 (as highlighted)
Shuttering for Plain Concrete of Strip footing in Zone 1P Between PC 83-85, 87-89 (as highlighted)
Anti Termite application Under Strip footing in Zone 1P Between PC 83-85, 87-89 (as highlighted)
Steel Reinforcement for MCPE 3 Wall At Axis 03-2, 02Q to 02R (as highlighted) Zone 2E 2F
Surface Preparation and Solvent Base Primer for Strip footing Zone 2G (inner) Between PC 134-136-138
Steel Reinforcement for BUTTRESS BOI BOV 8 & 9 Zone 1B 1C
Installation and Survey Report for Location and Levels of Anchor and Base Plate for Canopy at Zone 2P
Installation and Survey Report for Location and Levels of Anchor M36 gr. 8.8 & M27 gr. 8.8 and Base Pl
Installation of Rock and Boulder No. RB-311 (4th Layer) (4 of 4)
Installation of Rock and Boulder No. RB-063 (2nd Layer) (2 of 5)
"Inspection of Backfilling Gravel around the Manhole for MH-D-01-A1, MH-D-01-A2, MH-D-01-B1, MH-D
"Excavation for Foul Water Line Branches of FW-A-23, FW-A-22, FW-A-21, FW-A-20, FW-A-19, FW-A-18 pr
Inspection and Compaction Test for 5th Layer (5 of 12) backfilling (grading) at Zone-6A as highlighted i
Inspection for Sand Bedding under MV Line from B/MV/17 to B/MV/26 at Zone-B as highlighted in the at
Excavation for MV Line FROM B/MV/26 TO B/MV/10 includign Pit B/MV/26, B/MV/18, B/MV/07, B/MV/10
Inpection of Casting Concrete for Short Piece & Surface Preperation prior to start waterproofing and A
Excavation for Potable Water Line at Zone-G including Pit G/PW/07 as highlighted in the attached drawi
Excavation for Fire Water Line including Pit G/F/05 at Zone-G as highlighted in the attached drawing
Concreting for BUTTRESS BOV 69 Zone 2C
Shuttering and Shear Connector for BUTTRESS BOV 69 Zone 2C
Concreting for Buttress BOI 126 (2nd) Zone 2R
Inspection and compaction test 3rd layer for backfilling around Strip footing and PC 166-168-170-172-
Shuttering and Shear Connector for Buttress BOI 126 (2nd) Zone 2R
Concreting for Buttress BOI 14, 15, 16, 17 Zone 1D 1E
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 4 layers) after Gravel layi
Surface Preparation and Solvent Base Primer for Strip footing between PC 120-122-124-126 Zone 2E
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 6 layers) after Gravel layi
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) (Out of 7 layers) after Gravel layi
2nd Coat Cementitious Waterproofing for Kicker & Wall (Outer Side) of Circular Wall (10) Half Part 1,
Stack Boulders Installed 4th layer upto Level +876.60 (Part 3), at Bottom side of Planted Bed 1, Insi
Warning Tape Installation for Storm Water Line Outfall-F for (450mmØ-UPVC- Class 4) from (MH-F-0
Excavation & Surface preparation Prior to Install Stone Boulders along Planted Bed 2 to 3 and above,
300 mm Gravel 3/8" Backfilling and Geotextile for Storm Water Line Outfall-F for (450mmØ-UPVC- C
Solvent Base Primer Coating prior to Membrane Waterproofing on Blinding under foundation at Grid (
1st Coat Cementitious Waterproofing for Kicker & Wall (Outer Side) of Circular Wall (10) Half Part 1,
Surface Preparation Prior to Backfilling around the Manholes (Type 'A' 4 no's) (MH-D-01-A1-02, MH
Surface Preparation Prior to Backfilling Inside Back of House at Aviary garden, At Highlighted area in
Inspection of Spatter Dash (Rough Coat) Prior to Internal Plastering for walls Inside Main meeting
Plaster Guide Points & Accessories for Internal walls Inside Main meeting room (GF-5015), Private
Installation of Rock and Boulder No. RB-311 (3rd Layer) (3 of 3)
Installation of Rock and Boulder No. RB-108 - 8th Layer (8 of 8)
"Inspection and Compaction Test for Backfilling (6th Layer) for Storm Water Line from MH-D-05 to MH-D-0
"Inspection and Compaction Test for Backfilling (10th Layer) for Storm Water Line from MH-D-07 to MH-D
"Inspection and Compaction Test for Backfilling (5th Layer) for Storm Water Line from MH-D-01-B1 to MH
Inspection and Compaction Test for 1st Layer (1 of 2) Backfilling under Bouder No. RB-337 (Stock Pile # 1
"Surface Preparation Prior to Start Backfill Gravel for Manhole - MH-D-03, MH-D-03-01, MH-D-04, M
Inspection and Compaction Test for 2nd Layer (2 of 4) backfilling (grading) at Zone-5A as highlighted in
Excavation for Potable Water Line at Zone-G & K including Pit K/PW/08 as highlighted in the attached d
Excavation for Fire Water Line at Zone-G & K as highlighted in the attached drawing
"Inspection and Compaction Test for Backfilling (5th Layer) for Storm Water Line from MH-D-05 to MH-D-0
"Inspection and Compaction Test for Backfilling (4th Layer) for Storm Water Line from MH-D-01-B1 to MH
Concreting for BUTTRESS BIV 04 & 05 (2nd) Zone 1A 1B
Shuttering and Shear Connector for BUTTRESS BIV 04 & 05 (2nd) Zone 1A 1B
Steel Reinforcements for BUTTRESS BOI BOV BII BIV 01 Zone 1A
Surface Preparation and Solvent Base Primer for Strip footing between PC 176-178-180 Zone 2N
Concreting for INFILL WALL Between Buttress outer 114-115 Axis 02-2, 02AR to 02AS Zone 2N
Shuttering for INFILL WALL Between Buttress outer 114-115 Axis 02-2, 02AR to 02AS Zone 2N
Concreting for BUTTRESS BII BIV 19 (1st) Zone 1E
Shuttering for BUTTRESS BII BIV 19 (1st) Zone 1E
Level and Location for BUTTRESS BIV 04 & 05 (2nd) Zone 1A 1B
Level and Location for INFILL WALL Between Buttress outer 114-115 Axis 02-2, 02AR to 02AS Zone 2N
Level and Location for BUTTRESS BII BIV 19 (1st) Zone 1E
Surface Preparation Prior to start Backfilling at Strip footing and PC between PC 34-36-38-40-42-44 as
Excavation for MV Line FROM B/MV/17 TO B/MV/26 at Zone-B as highlighted in the attached drawing
INSPECTION FOR MANHOLE BASE INSTALLATION AND UPVC PIPE CONNECTION FOR - MH-A-01, MH-A-02,
Soil Preparation under Boulder No. RB- 337 after cutting
Excavation for Potable Water Line at Zone-K including Pit K/PW/02 as highlighted in the attached drawi
Gravel 3/8 Bedding & Geotextile Surround for Sub surface Drainage line (600mm & 450mm) Inside Gey
Excavation & Bed Preparation for Sub surface Drainage Main line & Sleeves Pipes (250mm, 160mm & 1
Excavation for Fire Water Line including Pit K/F/02 at Zone-K as highlighted in the attached drawing
Inspection & Compaction tests of 3rd Layer (out of 8) Backfilling (Sub-Grade) after Gravel laying f
Surface preparation prior to Waterproofing for footing & Kicker (Outer Side) of Circular Walls (10) Hal
Surface preparation prior to Waterproofing on Blinding under foundation at Grid (A/12-16) & (A-B/14)
Concrete Pouring & Shuttering for Kicker (2nd Lift) of 2 Walls (Curved) along the Boundary wall at En
Coordinates & Levels for Kicker (2nd Lift) of 2 Walls (Curved) along the Boundary wall at Entrance, in
Pipe Installation sub surface drainage (main line) and corrugated PP (size:450 & 600 mm Ø) in water
Inspection and compaction test 3rd layer for backfilling around PC 160 -162 (as highlighted) Zone 2L SP
Level and Location for BUTTRESS BIV 06 (2nd) Zone 1B
Level and location for BUTTRESS BOV 68 Zone 2C
Concreting for MCPE 2 Foundation at axis 02-AC to 03-K as highlighted
Concreting for BUTTRESS BIV 06 (2nd) Zone 1B
Shuttering and Shear Connector for BUTTRESS BIV 06 (2nd) Zone 1B
Steel Reinforcements for BUTTRESS BOI BOV 70 & 71 Zone 2C 2D
Steel Reinforcements and Anchors for BII 4, 5, 6 Zone 1A 1B
Concreting for BUTTRESS BOV 68 Zone 2C
Shuttering and Shear Connector for BUTTRESS BOV 68 Zone 2C
Inspection and compaction test 2nd layer for backfilling around Strip footing and PC 166-168-170-172-
Installation and Fixation of Base plates & Anchor Bolts and Check Coordinates & Levels for Outer Can
Stack Boulders Installed 3rd layer upto Level +876.20 (Part 3), at Bottom side of Planted Bed 1, Insi
Single layer 4mm thk Modified Bituminous Water Proofing Membrane for Boundary wall Foundation & K
Protection layer 4mm thk Bituminous protection board for Foundations & Columns (Upto 500mm height)
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Base) after Gravel laying for Sub surf
Concrete Pouring & Shuttering of Wall & Columns for Outer Canopy 1 at Physic Garden, as per highlig
Coordinates & Levels of Wall & Columns for Outer Canopy 1 at Physic Garden, as per highlighted area
Marking & Check for coordinates of Tree Pits (03 no's) at bottom side of Planted bed # 1, Inside Wate
Grouting for Stone Cladding of Boundary wall (Outer Side) at Span 60A & 60B and Column's C60A, C6
Grouting for Stone Cladding of Boundary wall (Outer Side) at Span 59, 61A & 61B and Column's C59,
Inspection and Compaction Test for 4th Layer (4 of 12) backfilling (grading) at Zone-6A as highlighted i
Installation of Rock and Boulder No. RB-108 - 7th Layer (7 of 8)
Pipe Sleeve Installation for Strip Footing Pipes (160mmØ-UPVC-CL-4), At Crescent-2, Zone 2J, As pe
Concreting for BUTTRESS BIV 7 (2nd) Zone 1B
Shuttering and Shear Connector for BUTTRESS BIV 7 (2nd) Zone 1B
Concrerting for BUTTRESS BIV 8 & 9 Zone 1B 1C
Shuttering and Shear Connector for BUTTRESS BIV 8 & 9 Zone 1B 1C
Concreting of strip footing (Plain Concrete) Between PC 37-39-41-43 Zone 1G
Shuttering of strip footing (Plain Concrete) Between PC 37-39-41-43 Zone 1G
Anti termite application under strip footing (Plain Concrete) Between PC 37-39-41-43 Zone 1G
Level and location for BUTTRESS BIV 7 (2nd) Zone 1B
Level and location for BUTTRESS BIV 8 & 9 Zone 1B 1C
Level and location for strip footing (Plain Concrete) Between PC 37-39-41-43 Zone 1G
Level and location for strip footing (Plain Concrete) Between PC 83-85-87, 84-86-88 Zone 1P
Concreting of strip footing (Plain Concrete) Between PC 83-85-87, 84-86-88 Zone 1P
Shuttering of strip footing (Plain Concrete) Between PC 83-85-87, 84-86-88 Zone 1P
Anti termite application under strip footing (Plain Concrete) Between PC 83-85-87, 84-86-88 Zone 1P
Installation of Rock and Boulder No. RB-311 (2nd Layer) (2 of 3)
Installation of Rock and Boulder No. RB-108 - 6th Layer (6 of 8)
Excavation for Fire Water Line at Zone-K as highlighted in the attached drawing
Excavation for Potable Water Line at Zone-K as highlighted in the attached drawing
Soil Preparation under Boulder No. RB- 337 prior to start cutting
"Inspection and Compaction Test for Backfilling (5th Layer) for Storm Water Line from MH-D-01 to MH-D-
Inspection of Concrete Pouring for the Beam of Seating Area (2) at Zone-L (SA-37) As Highlighted
Installation of UPVC straight conduit (Dia.25mm) and Box for Fire Alarm (Speaker,Fire Telephone Ca
Installation of straight UPVC conduit (Dia.25mm) and Box for Power (Cleaner Socket) at the Mainten
Marking & Check for coordinates of Tree Pits (37 no's) at along the Geyser Garden Inside Water Garde
Concrete pouring & Shuttering for Ring Beam @ Grid (3-14/Left. Side) on Boundary wall at Aviary Gar
Steel Reinforcement for Ring Beam @ Grid (3-14/Left. Side) or 37 to 48, on Boundary wall at Aviary G
Single Layer 4mm thk Modified Bituminous Membrane Waterproofing for Foundation (Inner Face) of Ou
Single Layer 4mm thk Modified Bituminous Membrane Waterproofing for Foundation (Outer Face) of Ou
Level and location for Buttress BII 14, 15, 16, 17 Zone 1D 1E
Level and location for Buttress BOV 6 (2nd) Zone 1B
Concreting for BUTTRESS BII 14, 15, 16, 17 Zone 1D 1E
Shuttering and Shear Connector for BUTTRESS BII 14, 15, 16, 17 Zone 1D 1E
Concreting for BUTTRESS BOV 06 (2ND) Zone 1B
Shuttering and Shear Connector for BUTTRESS BOV 06 (2nd) Zone 1B
Inspection and compaction test 2nd layer for backfilling around PC 160 -162 (as highlighted) Zone 2L SP
Inspection and compaction test 9th layer for backfilling around Strip footing and PC 110-112 (as highli
Inspection and compaction test 1at layer for backfilling around Strip footing and PC 166-168-170-172-
Surface Preparation Prior to start Backfilling at Strip footing and PC between PC 166-168-170-172-174
"Inspection and Compaction Test for Backfilling (9th Layer) for Storm Water Line from MH-D-03 to MH-D-0
Inspection for Sand Bedding under pipe for Potable Water Line at Zone-B as highlighted in the attached
Inspection for Sand Bedding under pipe for Fire Water Line at Zone-B as highlighted in the attached draw
Inspection and Compaction Test for 1st Layer (1 of 4) backfilling (grading) at Zone-5A as highlighted in
Inspection and Compaction Test for Sub-Base (1 of 1) under Bouder No. RB-263 (Stock Pile # 109 A-1-A)
Inspection of Concrete Pouring for the Foundation and Kicker of SBC-05
Inspection of Formwork for the Foundation and Kicker of SBC-05
Steel Reinforcement Inspection for the Foundation and Side Walls of SBC-05
Inspection of Concrete Pouring for the Foundation and Kicker of SBC-06
Inspection of Formwork for the Foundation and Kicker of SBC-06
"Surface Preparation Prior to Start Backfill Gravel for Manhole MH-A-01-A1, MH-A-01-A2, MH-A-01-A
Inspection for Casting the Blinding Concrete under the SBC-08 (as Highlighted)
Installation of Rock and Boulder No. RB-169 (3rd Layer) (3 of 3)
Steel Reinforcement Inspection for the Foundation and Side Walls of SBC-06
Excavation for Fire Water Line at Zone-K as highlighted in the attached drawing
Inspection and Compaction test for Sanding Bedding for Fire Water Line at Zone-B as highlighted in the
Installation of Rock and Boulder No. RB-169b (1st Layer) (1 of 4)
Installation of Rock and Boulder No. RB-169 (2nd Layer) (2 of 3)
Excavation for Potable Water Line at Zone-K as highlighted in the attached drawing
"Inspection and Compaction Test for Backfilling (9th Layer) for Storm Water Line from MH-D-07 to MH-D-
"Inspection and Compaction Test for Backfilling (9th Layer) for Storm Water Line from MH-D-01 to Outfall
"Inspection and Compaction Test for Backfilling (8th Layer) for Storm Water Line from MH-D-03 to MH-D-
"Inspection and Compaction Test for Backfilling (4th Layer) for Storm Water Line from MH-D-05 to MH-D-0
Inspection of Spatter Dash (Rough Coat) Prior to Internal Plastering for walls Inside Stores (GF-5017
Inspection and Compaction Test for 2nd Layer (2 of 2) Backfilling under Bouder No. RB-263 (Stock Pile #
Solvent Base Primer Coating prior to waterproofing for Boundary wall Foundation & Kicker (Inner Fac
Inspection and Compaction Test for 3rd Layer (3 of 12) backfilling (grading) at Zone-6A as highlighted i
Coordinates & Levels of Blinding under foundation at Grid (A/12-16) & (A-B/14) @ Butterfly Garden, a
Excavation & Surface Preparation for foundation at Grid (A/12-16) & (A-B/14) @ Butterfly Garden, at
Concrete pouring for Blinding under foundation at Grid (A/12-16) & (A-B/14) @ Butterfly Garden, at h
Solvent Base Primer Coating prior to waterproofing for Boundary wall Foundation & Kicker (Inner Fac
Single layer 4mm thk Modified Bituminous Water Proofing Membrane for Foundation of Boundary wall
Installation of Anchor M36 gr. 8.8 & M27 gr. 8.8 and Base Plate for Zone 2P (Inner) Axis 02-1, 02AT - 0
Installation of Anchor and Base Plate for Canopy at Zone 2P (Inner) Axis 02-1, 02AT - 02AU - 02AV - 02A
Inspection and compaction test 3rd layer for backfilling around Strip footing and PC 145-147-149 (as hig
Steel Reinforcement for RINGBEAM at Zone 2P (outer) Axis 02AT to 02AW, 02-2
Steel Reinforcement for Ring Beam Axis 02-1, 02AW to 02AT (as Highlighted) Zone 2P
Steel Reinforcement for Strip footing Between PC 176-178-180 Zone 2N
Steel Reinforcement for BUTTRESS BII BIV 100, 101, 102 Zone 2K 2L
Shuttering for RINGBEAM for Zone 2P (Inner) Axis 02-1, 02AT - 02AU - 02AV - 02AW (as Highlighted)
Concreting for BUTTRESS BIV 4, 5, 6, 7 Zone 1A 1B
Shuttering and Shear Connector for BUTTRESS BIV 4, 5, 6, 7 Zone 1A 1B
Level and location for Buttress BIV 4, 5, 6, 7 Zone 1A 1B
Level, Location For RINGBEAM BASEPLATE AND ANCHORBOLTS for CANOPY at Zone 2P (Inner) Axis 02-1,
"Inspection of Grouting (Horizontal Joints) for Rock Boulder No. RB-329 - for All Layers "
"Inspection of Grouting (Horizontal Joints) for Rock Boulder RB-330 - for All Layers"
Installation of Rock and Boulder No. RB-109 - 9th Layer (9 of 9)
"Inspection of Grouting (Horizontal Joints) for Rock Boulder RB-331 - for All Layers"
"Inspection of Grouting (Horizontal Joints) for Rock Boulder RB-332 - for All Layers"
"Inspection of Grouting (Horizontal Joints) for Rock Boulder RB-333 - for All Layers"
"Inspection and Compaction Test for Backfilling (7th Layer) for Storm Water Line from MH-D-03 to MH-D-
"Inspection and Compaction Test for Backfilling (8th Layer) for Storm Water Line from MH-D-01 to Outfall
Inspection and Compaction Test for 1st Layer (1 of 2) Backfilling under Bouder No. RB-263 (Stock Pile # 1
"Inspection and Compaction Test for Sub-base (1 of 1) under Bouder No. RB-242 (Stock Pile # 109 A-1-A
Soil Preparation under Boulder No. RB- 242 after cutting
"Inspection for Casting the Blinding Concrete under the Gullies (G-H-01, G-H-02, G-H-03, G-H-04, G
"Inspection and Compaction Test for Backfilling (8th Layer) for Storm Water Line from MH-D-07 to MH-D-
Excavation for Fire & Security Distribution Line from (B/FS/24 to B/FS/36) at Zone-B as highlighted in t
Excavation for Telecommunication Line from (B/TL/21 to B/TL/36) at Zone-B as highlighted in the attac
Excavation for Potable Water Line at Zone-B as highlighted in the attached drawing
Excavation for Fire Water Line at Zone-B as highlighted in the attached drawing
Excavation for Fire Water Line at Zone-B as highlighted in the attached drawing
Inspection & Compaction tests of 1st Layer Backfilling (Sub-Grade) after Gravel laying for Sub su
Stack Boulders Installed One Layer upto Level +876.60 (Part 2) & Another Layer upto Level +877.10 (Pa
Visual Inspection of Ceramic Tiles Mockup (Group A, B & C) Installed inside Vehicle Maintenance R
Inspection & Compaction tests of 2nd Layer (out of 8) Backfilling (Sub-Grade) after Gravel laying f
Concrete Pouring & Shuttering for Walls of Circular Walls (6, 7, 8, 9 & 10) Half Part 2, inside Maze ga
Coordinates & Levels for Walls of Circular Walls (6, 7, 8, 9 & 10) Half Part 2, inside Maze garden, as p
1st Coat Damp proofing for Concrete Encasement of Shot piece's of Manholes (Type 'B' 4 no's) Inside
Stack Boulders Installed 1st & 2nd layer upto Level +875.80 (Part 3), at Bottom side of Planted Bed 1
Concrete pouring for Encasement of Shot piece's of Manholes (Type 'A' 1 No's & 'B' 2 no's)(MH-D-01
Concrete pouring for Encasement of Shot piece's of Manholes (Type 'A' 1 No's & 'B' 3 no's)(MH-D-03
Primer Coating prior to Damp proofing for Encasement of Shot piece's of Manholes (Type 'B' 4 no's) In
Surface Preparation prior to Waterproofing for Encasement of Shot piece's of Manholes (Type 'B' 4 no'
Solvent Base Primer Coating prior to Membrane Waterproofing for Foundation & Kicker (Inner & Outer
Concrete pouring & Shuttering for Footing of Straight Wall (Left Side) at Entrance, inside Maze garden
Coordinates & Levels for Ring Beam @ Grid (3-14/Left. Side) on Boundary wall at Aviary Garden, As pe
Installation and Fixation of Base plates & Anchor Bolts and Check Coordinates & Levels for Ring Beam
Steel Reinforcement for Wall & Buttress upto bottom of Ring Beam @ Grid (3-14/Left. Side), of Bounda
Level and location for Buttress BOI 4, 5, 7 Zone 1A 1B
Level and location for Buttress BOV 69 Zone 2C
Level, Location For RINGBEAM BASEPLATE AND ANCHORBOLTS for Zone 2P (Inner) Axis 02-1, 02AT - 02A
Level, Location For RINGBEAM for Zone 2P (Inner) Axis 02-1, 02AT - 02AU - 02AV - 02AW (as Highlighted
Concreting for BUTTRESS BOI 4, 5, 7 Zone 1A 1B
Shuttering and Shear Connector for BUTTRESS BOI 4, 5, 7 Zone 1A 1B
Protection layer of 4mm thick bituminous protection board for Pilecaps 26, 28, 29, 30 Zone 1E
Single Layer of 4mm thick Modified bituminous waterproofing membrane for Pilecaps 26, 28, 29, 30 Zo
Surface Preparation and Solvent Base Primer for Pilecaps 26, 28, 29, 30 Zone 1E
Geotextile Sheet and 30mm Screed under strip footing between PC 1-3-5 Zone 1A
Single Layer of 4mm thick modified bituminous waterproofing membrane under strip footing between
Steel Reinforcement for Counter Fort Wall for Infill Wall Between Buttress BO 114 -115 at Zone 2N (as h
Concreting for BUTTRESS BOV 69 Zone 2C
Installation of UPVC straight conduit (Dia.25mm) and Box for Voice and DATA (Data & TV Outlet) at
Shuttering and Shear Connector for BUTTRESS BOV 69 Zone 2C
Concreting for RINGBEAM for Zone 2P (Inner) Axis 02-1, 02AT - 02AU - 02AV - 02AW (as Highlighted)
Inspection and compaction test 8th layer for backfilling around Strip footing and PC 112-114 (as highli
Inspection and compaction test 4th layer for backfilling around Pilecap 118 (as highlighted) Zone 2D SP
Inspection and compaction test 6th layer for backfilling around Strip footing and PC 103 - 105 (as highl
Inspection and compaction test 2nd layer for backfilling around Strip footing and PC 145-147-149 (as hi
Inspection and compaction test 1st layer for backfilling around PC 160 -162 (as highlighted) Zone 2L SP#
Installation of UPVC straight conduit (Dia.25mm) and Box for Voice and DATA (Data & TV Outlet) at
Installation of UPVC straight conduit (Dia.25mm) and Box for Fire Alarm (RFAP) at the Maintenance a
Installation of Rock and Boulder No. RB-169 (1st Layer) (1 of 3)
Installation of Rock and Boulder No. RB-109 - 8th Layer (8 of 9)
Installation of Rock and Boulder No. RB-309 (4th Layer) (4 of 4)
Installation of Rock and Boulder No. RB-68 (Additional Quantity for Layer 3, Layer 4 and Layer 5 as p
Installation of Rock and Boulder No. RB-115a (2nd & 3rd Layer)
"Completion of Rock Boulder No. RB- 68 with Grouting (for Old Layers and Extension)"
Completion of Rock Boulder No. RB- 285 with Grouting
Completion of Rock Boulder No.RB- 302 with Grouting
"Inspection and Compaction Test for Backfilling (8th Layer) for Storm Water Line from MH-D-03 to MH-D-0
"Inspection and Compaction Test for Backfilling (6th Layer) for Storm Water Line from MH-D-03 to MH-D-
"Inspection and Compaction Test for Backfilling (7th Layer) for Storm Water Line from MH-D-01 to Outfall
Excavation for Storm Water Line from MH-F-01-4 to MH-F-04 (Main Line) as highlighted
Soil Preparation under Boulder No. RB- 263
Soil Preparation under Boulder No. RB- 242
"Inspection and Compaction Test for Backfilling (8th Layer) for Storm Water Line from MH-D-08-01 to MH
"Inspection and Compaction Test for Backfilling (7th Layer) for Storm Water Line from MH-D-07 to MH-D-
"Inspection and Compaction Test for Backfilling (3rd Layer) for Storm Water Line from MH-D-05 to MH-D-0
"Inspection and Compaction Test for Backfilling (6th Layer) for Storm Water Line from MH-D-01 to Outfall
"Inspection and Compaction Test for Backfilling (7th Layer) for Storm Water Line from MH-D-03 to MH-D-0
"Inspection and Compaction Test for Backfilling (5th Layer) for Storm Water Line from MH-D-03 to MH-D-
"Inspection and Compaction Test for Backfilling (3rd Layer) for Storm Water Line from MH-D-01-B1 to MH
"Inspection and Compaction Test for Backfilling (2nd Layer) for Storm Water Line from MH-D-01-B1 to M
Pipe Installation for Storm Water Line Outfall-E for (600mmØ-PP- CORRUGATED) from (MH-E-01 to
Bedding of Gravel 3/8" and Geotextile surrounding Storm Water Line Outfall-E for (600mmØ-PP- C
Level and location for Buttress BOI 126 (2nd) Zone 2R
Level and location for Buttress BOI 14, 15, 16, 17 Zone 1D 1E
Level and location for Strip Footing at Zone 2G Inner Between PC 134-136-138-140
Steel Reinforcement for BUTTRESS BIV 8 & 9 Zone 1B 1C
Concreting for Buttress BOI 126 (2nd) Zone 2R
Shuttering and Shear Connector for Buttress BOI 126 (2nd) Zone 2R
Concreting for Buttress BOI 14, 15, 16, 17 Zone 1D 1E
Shuttering and Shear Connector for Buttress BOI 14, 15, 16, 17 Zone 1D 1E
Concreting for Strip Footing at Zone 2G Inner Between PC 134-136-138-140
Shuttering for Strip Footing at Zone 2G Inner Between PC 134-136-138-140
Steel Reinforcement for Strip Footing at Zone 2G Inner Between PC 134-136-138-140
Steel Reinforcement for BUTTRESS BOI BOV 18 & 19 (Surrounded concrete Wadi) Zone 1E
'Pipe Installation sub surface drainage (main line) (size:110 & 160 mm Ø) in water garden. As per hi
'Pipe Installation sub surface drainage (main line) (size: 400 & 800 mm Ø) in water garden. As per hi
Steel Reinforcement for Perimeter Wall at AXIS 02-2, 02AT to 02AS Between BOI BOV 115 - 116 Zone 2N
Level and location for BUTTRESS BII BIV 18 (1st) Zone1E
Concreting for BUTTRESS BII BIV 18 (1st) Zone 1E
Shuttering BUTTRESS BII BIV 18 (1st) Zone 1E
Level and location for BUTTRESS BII 70 & 71 (2nd) Zone 2C 2D
Protection layer of 4mm thick Bituminous protection board for Strip footing between PC 168-170, 172
Single Layer of 4mm thick modified bituminous waterproofing membrane for Strip footing between PC
Concreting for BUTTRESS BII 70 & 71 (2nd) Zone 2C 2D
Shuttering & Shear Connector for BUTTRESS BII 70 & 71 (2nd) Zone 2C 2D
Protection layer of 4mm thick bituminous protection board for Central Bridge Foundation Zone 2L
Two Water Proofing Membrane for Central Bridge Foundation Zone 2L
Inspection and compaction test 1st layer for backfilling around Strip footing and PC 145-147-149 (as hig
Inspection and compaction test 7th layer for backfilling around Strip footing and PC 112-114 (as highli
Installation of Rock and Boulder No. RB-063 (1st Layer) (1 of 5)
Installation of Rock and Boulder No. RB-062 (5th Layer) (5 of 5)
Installation of Rock and Boulder No. RB-109 - 7th Layer (7 of 9)
Installation of Rock and Boulder No. RB-244 (1st Layer) (1 of 4)
Inspection of Grouting (Horizontal Joints) for Rock Boulder RB-296 - for All Layers
Inspection of Grouting (Horizontal Joints) for Rock Boulder RB-304 - for All Layers
Gravel 3/8 Bedding & Geotextile Surround for Sub surface Drainage line 110mm & Sleeves Pipes (Slee
Excavation & Surface preparation under Stone Boulders at Between Geyser Garden & Boundary wall al
Concrete pouring for Blinding under Manholes (6 no's) Inside Discovery Garden at highlighted area in
Excavation & Blinding levels for Manholes (6 no's) Inside Discovery Garden at highlighted area in att
Steel Reinforcement for Ring Beam @ Grid (3-14/Left. Side) or 37 to 48, on Boundary wall at Aviary G
Pipe Installation of Storm Water Line Outfall-F for (450mmØ-UPVC- Class 4) from (MH-F-01 to MH-F
Bedding of Gravel 3/8" and Geotextile surrounding Storm Water Line Outfall-F for (450mmØ-UPVC-
Warning Tape Installation for Storm Water Line Outfall-F for (400mmØ-UPVC- Class 4) from (MH-F-0
300 mm Gravel 3/8" Backfilling and Geotextile for Storm Water Line Outfall-F for (400mmØ-UPVC- C
Warning Tape Installation for Storm Water Line Outfall-H for (450mmØ-UPVC- Class 4) from (MH-H-0
300 mm Gravel 3/8" Backfilling and Geotextile for Storm Water Line Outfall-H for (450mmØ-UPVC- C
Warning Tape Installation for Storm Water Line Outfall-E for (600mmØ-PP- CORRUGATED) from (MH-
300 mm Gravel 3/8" Backfilling and Geotextile for Storm Water Line Outfall-E for (600mmØ-PP- C
Gravel 3/8 Bedding & Geotextile Surround for Sub-Surface Main line (800mm from MH-C-1 to MH-C
Plaster Guide Points & Accessories for Internal walls Inside Stores (GF-5017, 5019 & 5021) at Grid (
Inspection of Spatter Dash (Rough Coat) Prior to Internal Plastering for walls Inside Entance Lobby (
Inspection of Internal Plastering for walls of Passage at Grid (9'-9/N-X) & Reception (GF-5000), at G
Surface Preparation prior to Waterproofing for Foundation & Kicker (Inner & Outer Faces) of Outer Ca
Steel Reinforcement for Walls of Circular Walls (6, 7, 8, 9 & 10) Half Part 2, inside Maze garden, as pe
Stone Cladding for Boundary wall (Inner Face) @ Span 41 of Water Garden, at Highlighted area in At
Stone Cladding for Boundary wall (Inner Face) @ Span 44 & 45 of Water Garden, at Highlighted area
Stone Cladding for Boundary wall (Inner Face) @ Span 40 of Water Garden, at Highlighted area in At
Stack Boulders Installed 6th & 7th layer upto Level +878.00 (Part 2), at Top leftside of Planted Bed 1
Stone Cladding for Boundary wall (Inner Face) @ Span 18, As per Attached Highlighted Drawing's.
Installation of Rock and Boulder No. RB-062 (4th Layer) (4 of 5)
Installation of Rock and Boulder No. RB-309 (3rd Layer) (3 of 4)
Inspection of Grouting (Horizontal Joints) for Rock Boulder RB-307a - for All Layers
Inspection of Grouting (Horizontal Joints) for Rock Boulder RB-307 - for All Layers
Inspection of Grouting (Horizontal Joints) for Rock Boulder RB-154 - for All Layers
Inspection of Grouting (Horizontal Joints) for Rock Boulder RB-298 - for All Layers
Inspection of Grouting (Horizontal Joints) for Rock Boulder RB-297 - for All Layers
"Inspection and Compaction Test for Backfilling (4th Layer) for Storm Water Line from MH-D-03 to MH-D-
"Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-G (Seating
"Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-G (Seating
"Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-G (Seating
"Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-G (Seating
Steel Reinforcement for MCPE 1 Wall at axis 03-2, 02AP to 02AM (as highlighted) Zone 2N 2M
Level and location for Strip footing Between PC 170-172 Zone 2M
Level and location for Mass Concrete of Strip footing Between PC 134-136-138-140-142-144 Zone 1F 1G
Level and location for BUTTRESS BII 99 Zone 2K
Concreting for Strip Footing between PC 170-172 Zone 2M
Shuttering for Strip Footing between PC 170-172 Zone 2M
"Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-G (Seating
Steel Reinforcement for Strip Footing between PC 170-172 Zone 2M
Surface Preparation Prior to Start Backfill Gravel for Manhole from FW-A-25 to FW-A-13 - as Highlighted
Concreting for mass concrete of strip footing between PC 134-136-138-140-142-144 Zone 1F 1G (as high
Soil Preparation at Zone - 5A prior to start Cut and removal of cutting material and backfilling upto (-2
Shuttering for mass concrete of strip footing between PC 134-136-138-140-142-144 Zone 1F 1G (as high
Inspection and Compaction Test for 2nd Layer (2 of 12) backfilling (grading) at Zone-6A as highlighted i
Application of Anti Termite under mass concrete for strip footing between PC 134-136-138-140-142-144
Concreting for BUTTRESS BII 99 Zone 2K
Shuttering and Shear Connector for BUTTRESS BII 99 Zone 2K
Surface Preparation Prior to start Backfilling at Strip footing between PC 160-162 as highlighted Zone 2L
Surface Preparation Prior to start Backfilling around Pilecap and Strip footing between PC 145-147-149
Inspection and compaction test 3rd layer for backfilling around Pilecap 118 (as highlighted) Zone 2D SP
Inspection and compaction test 6th layer for backfilling around Strip footing and PC 112-114-116 (as hi
Inspection and compaction test 5th layer for backfilling around Strip footing and PC 103 - 105 (as highl
Inspection and compaction test 4th layer for backfilling around Strip footing and PC 117 (as highlighted
Installation of UPVC conduit 75mm (Duct sleeves) passing through the wall for Low Current at the Ma
Installation of straight UPVC conduit (Dia.32mm Socket Outlet) for Power at the Crescent -01 (Axis 01/
Installation of stub-up UPVC conduit (Dia.32mm Socket Outlet) for Power at the Maze Garden per attac
Installation of Rock and Boulder No. RB-060 (All Layer) (5 of 5)
Installation of Rock and Boulder No. RB-108 - 5th Layer (5 of 8)
Inspection of Grouting (Horizontal Joints) for Rock Boulder RB-308a - for All Layers
Inspection of Grouting (Horizontal Joints) for Rock Boulder RB-308 - for All Layers
Inspection for the Excavation of Storm Box Culvert - SBC-08 (As Highlighted)
Inspection and Compaction Test for Sub-Base (1 of 1) under 6th lift of Rock Boulder no. RB-108 (Stock Pi
Inspection and Compaction Test for 1st Layer (1 of 1) Backfilling under 6th lift of Rock Boulder no. RB-1
"Inspection and Compaction Test for Backfilling (5th Layer) for Storm Water Line from MH-D-01 to Outfall
"Inspection and Compaction Test for Backfilling (7th Layer) for Storm Water Line from MH-D-08-01 to MH
"Inspection and Compaction Test for Backfilling (6th Layer) for Storm Water Line from MH-D-07 to MH-D-
Inspection for Casting the Blinding Concrete under the SBC-05 (as Highlighted)
"Inspection and Compaction Test for Backfilling (5th Layer) for Storm Water Line from MH-D-01 to MH-D-
Solvent Base Primer Coating prior to Membrane Waterproofing for Foundation (Inner Face) of Outer C
Coordinates & Levels for Footing of Straight Wall (Left Side) at Entrance, inside Maze garden, as per h
Steel Reinforcement for Footing & Kicker of Straight Wall (Left Side) at Entrance, inside Maze garden,
Installation of stub-up UPVC conduit (25mm) for Security (CAM) at the Maze Garden Zone 5A per attach
Installation of stub-up UPVC conduit (25mm) for Voice and Data (WIFI & CAM) at the Maze Garden Zone
Level and location for BUTTRESS BOV 4, 5, 7 (2nd) Zone 1A 1B
Level and location for Strip footing Between PC 118-120-122-124-126 Zone 2E
Level and location for Strip footing between PC 176-178-180 Zone 2N
Level, Location For MCPE 2 foundation Axis 02-C to 03-K Zone 2J 2K
Concreting for MCPE 2 Foundation at axis 02-AC to 03-K as highlighted
Shuttering for MCPE 2 Foundation at axis 02-AC to 03-K as highlighted
Steel Reinforcement for MCPE 2 Foundation at axis 02-AC to 03-K as highlighted
Steel Reinforcement for RINGBEAM at Zone 2M (outer) Axis 02AL to 02AP, 02-2
Steel Reinforcement for RINGBEAM at Zone 2P (outer) Axis 02AT to 02AW, 02-2
Concreting and Shear Connector for BOV 4, 5, 7 (2nd) Zone 1A 1B
Shuttering and Shear Connector for BOV 4, 5, 7 (2nd) Zone 1A 1B
Concreting for Strip footing Between PC 118-120-122-124-126 Zone 2E
Shuttering for Strip footing Between PC 118-120-122-124-126 Zone 2E
Steel Reinforcement for Strip footing Between PC 118-120-122-124-126 Zone 2E
Concreting for Strip footing Between PC 176-178-180 Zone 2N
Shuttering for Strip footing Between PC 176-178-180 Zone 2N
Steel Reinforcement for Strip footing Between PC 176-178-180 Zone 2N
Installation of stub-up UPVC conduit (25mm) for Fire Alarm at the Maze Garden Zone 5A per attached h
Installation of straight UPVC conduit (Dia.32mm Socket Outlet) for Power at the Crescent -01 (Axis 01
Excavation & Bed Preparation for Sub surface Drainage Main line & Sleeves Pipes (450mm drop to
Concrete Pouring & Shuttering for Walls of Circular Walls (8, 9 & 10) Half Part 1, inside Maze garden,
Coordinates & Levels for Walls of Circular Walls (8, 9 & 10) Half Part 1, inside Maze garden, as per h
Concrete pouring & Shuttering of Walls for Plant room at Discovery Garden at highlighted area in att
Excavation & Surface preparation under Stone Boulders at Bottom side of Planted bed 1, Inside Water
Inspection & Compaction tests of 1st Layer (out of 5) Backfilling (Sub-Grade) after Gravel laying f
Inspection & Compaction tests of Single Layer Backfilling (Sub-Base) after Gravel laying for Sub surfa
Inspection & Compaction tests of Single Layer Backfilling (Sub-grade) after Gravel laying for Sub surf
Surface Preparation and Solvent base primer for Strip footing between PC 168-170, 172-174-176 Zone 2
Concreting for BUTTRESS BOI BOV 126 (1st) Zone 2R
Concreting for Strip footing Between PC 166 - 168 Zone 2M
Shuttering for Strip footing Between PC 166 - 168 Zone 2M
Steel Reinforcement for Strip footing Between PC 166 - 168 Zone 2M
Level, Location For MCPE 3 foundation Axis 02Q to 02R Zone 2E 2F
Concreting for MCPE 3 Foundatiion Axis 02Q to 02R Zone 2E 2F
Shuttering for MCPE 3 Foundatiion Axis 02Q to 02R Zone 2E 2F
Steel Reinforcement for MCPE 3 Foundatiion Axis 02Q to 02R Zone 2E 2F
Pipe Installation for sub surface drainage (main line) (size: 450, 400, 315, 250 mm Ø) and (160 & 11
'Pipe Installation sub surface drainage (main line) (size: 250 mm Ø) and perforated pipes (160 &
Installation of straight UPVC conduit (Dia. 25mm) and Box for Fire Alarm (Speaker) at the Crescent-02 (
Installation of straight UPVC conduit (Dia. 25mm) and Box for Security (CAM) at the Crescent-02 (Axis
Installation of straight UPVC conduit (Dia. 25mm) and Box for Voice and Data (WIFI & CAM) at the Cres
Installation of UPVC straight conduit (Dia.25mm) and Box for Fire Alarm (Speaker,Fire Telephone Ca
Installation of Rock and Boulder No. RB-062 (3rd Layer) (3 of 5)
Installation of Rock and Boulder No. RB-317 (6th Layer) (6 of 6)
Installation of Rock and Boulder No. RB-311 (1st Layer) (1 of 3)
"Inspection and Compaction Test for Sub-base (1 of 1) under Bouder No. RB-169b (Stock Pile # 109 A-1-
"Inspection and Compaction Test for Backfilling (4th Layer) for Storm Water Line from MH-D-01 to Outfall
"Inspection and Compaction Test for Backfilling (6th Layer) for Storm Water Line from MH-D-03 to MH-D-0
"Inspection and Compaction Test for Backfilling (3rd Layer) for Storm Water Line from MH-D-03 to MH-D-
"Inspection and Compaction Test for Backfilling (2nd Layer) for Storm Water Line from MH-D-05 to MH-D-0
"Inspection and Compaction Test for Backfilling (6th Layer) for Storm Water Line from MH-D-08-01 to MH
Inpection of Casting Concrete for Short Piece & Surface Preperation prior to start waterproofing and
Surface Preparation prior to Waterproofing for Foundation & Kicker (Outer Face) of Outer Canopy 3, a
Coordinates & Levels of Walls for Plant room at Discovery Garden at highlighted area in attached Dra
Surface Preparation prior to Stone Cladding for Walls (Inner & Outer Faces) of Outer Canopy 3, at Phy
Solvent Base Primer Coating prior to Membrane Waterproofing for Foundation (Outer Face) of Outer C
Stack Boulders Installed 5th layer upto Level +877.10 (Part 2), at Top leftside of Planted Bed 1, Insi
Stack Boulders Installed 4th layer upto Level +876.60 (Part 2), at Top leftside of Planted Bed 1, Insi
Stack Boulders Installed 1st, 2nd & 3rd layer's upto Level +876.20 (Part 2), at Top leftside of Plante
Excavation & Surface preparation under Stone Boulders (Part 2) at top left Side of Planted bed 1, In
Installation of Rock and Boulder No. RB-109 - 6th Layer (6 of 9)
Reinforcement Inspection for the Foundation and Side Walls of SBC-06
Inspection for the Excavation of Storm Box Culvert - SBC-05 (As Highlighted)
Inspection and Compaction Test for 1st Layer (1 of 12) backfilling (grading) at Zone-6A as highlighted in
"Inspection and Compaction Test for Backfilling (5th Layer) for Storm Water Line from MH-D-07 to MH-D-
"Inspection and Compaction Test for Backfilling (4th Layer) for Storm Water Line from MH-D-01 to MH-D-
Installation of straight UPVC conduit (Dia.32mm) and Box for Security (CAM) at the Discovery Garden as
"Inspection and Compaction Test for Backfilling (3rd Layer) for Storm Water Line from MH-D-01 to Outfall
Inspection and Compaction Test for Sub-Base (1 of 1) under 7th lift of Rock Boulder no. RB-109 (Stock Pi
Inspection and Compaction Test for Sub-Base (Rock Area) under Bouder No. RB-255
Inspection and Compaction Test for Sub-Base (1 of 1) under Bouder No. RB-063 (Stock Pile # 109 A-1-A)
Soil Preparation under Boulder No. RB- 255
Inspection and Compaction Test for 1st Layer (1 of 1) Backfilling under 7th lift of Rock Boulder no. RB-1
Inspection and Compaction Test for 3rd Layer (3 of 3) Backfilling under Bouder No. RB-169b (Stock Pile #
Inspection and Compaction Test for Sub-Base (1 of 1) under Bouder No. RB-169 (Stock Pile # 109 A-1-A)
Soil Preparation under Boulder No. RB- 063 after cutting
Soil Preparation under Boulder No. RB- 063 prior to start cutting
Level, Location For RINGBEAM BASEPLATE AND ANCHORBOLTS for CANOPY at Zone 2P (Inner) Axis 02-1,
Level and location for BUTTRESS BOI BOV 6 (1st) ZONE 1B
Level and location for PILECAPS 60, 62, 64 ZONE 1J 1K
Level, Location For RINGBEAM BASEPLATE AND ANCHORBOLTS for Zone 2P (Inner) Axis 02-1, 02AT - 02A
Level, Location For RINGBEAM for Zone 2P (Inner) Axis 02-1, 02AT - 02AU - 02AV - 02AW (as Highlighted
Shuttering for PILECAP 78 Zone 1N
Concreting for PILECAP 78 Zone 1N
Steel Reinforcement for BUTTRESS BIV 10 & 11 Zone 1C
Concreting for BUTTRESS BOI BOV 6 (1st) Zone 1B
Shuttering and shear connector for BUTTRESS BOI BOV 6 (1st) Zone 1B
Concreting for PILECAPS 60, 62, 64 Zone 1J 1K
Shuttering for PILECAPS 60, 62, 64 Zone 1J 1K
Steel Reinforcement for PILECAPS 60, 62, 64 Zone 1J 1K
Concreting for RINGBEAM for Zone 2P (Inner) Axis 02-1, 02AT - 02AU - 02AV - 02AW (as Highlighted)
Shuttering for RINGBEAM for Zone 2P (Inner) Axis 02-1, 02AT - 02AU - 02AV - 02AW (as Highlighted)
Concreting for BUTTRESS BOI BIV 12 & 13 zone 1C 1D
Shuttering and Shear Connector for BUTTRESS BOV BIV 12 & 13 zone 1C 1D
Installation of straight UPVC conduit (Dia. 32mm & 25mm) and Box for Voice and Data (CAM,E-Ticket M
Steel Reinforcement for PILECAPS 74, 78 Zone 1N 1M
Installation of straight UPVC conduit (Dia. 32mm) and Box for Fire Alarm (Interface Module) at the Dis
Installation of Anchor and Base Plate for Canopy at Zone 2P (Inner) Axis 02-1, 02AT - 02AU - 02AV - 02A
Installation of straight UPVC conduit (Dia. 25mm) and Box for Voice and Data (WIFI) at the Crescent-02
Installation of Anchor M36 gr. 8.8 & M27 gr. 8.8 and Base Plate for Zone 2P (Inner) Axis 02-1, 02AT - 0
Inspection and compaction test 2nd layer for backfilling around Pilecap 118 (as highlighted) Zone 2D SP
Installation of straight UPVC conduit (Dia. 25mm) and Box for Fire Alarm (Speaker) at the Crescent-02 (
Inspection and compaction test 5th layer for backfilling around Strip footing and PC 112-114-116 (as hi
Inspection and compaction test 4th layer for backfilling around Strip footing and PC 103 - 105 (as highl
Inspection and compaction test 3rd layer for backfilling around Strip footing and PC 117 (as highlighted
Installation of straight UPVC conduit (Dia.32mm Socket Outlet) for Power at the Crescent -02 (Axis 02
Installation of straight UPVC conduit (Dia.32mm) for Power (F.O Converter & E-Ticket Machine) at the
Pipe Installation of Storm Water Line Outfall-H for (450mmØ-UPVC- Class 4) from (MH-H-01 to MH-H-
Bedding of Gravel 3/8" and Geotextile surrounding Storm Water Line Outfall-H for (450mmØ-UPVC- C
Pipe Installation of Storm Water Line Outfall-F for (450mmØ-UPVC- Class 4) from (MH-F-01 to MH-F
Bedding of Gravel 3/8" and Geotextile surrounding Storm Water Line Outfall-F for (450mmØ-UPVC-
Pipe Installation for Storm Water Line Outfall-F for (400mmØ-UPVC- Class 4) from (MH-F-02 to MH-
Installation of straight UPVC conduit (Dia. 25mm) and Box for Voice and Data (WIFI) at the Crescent-01
Level, Location For Excavation of Strip Footing Between PC 84-86-88 & 85-87 Zone 1P as Highlighted
Level, Location For Excavation of Strip Footing Between PC 38-40-42-44 Zone 1G as Highlighted
Steel Reinforcement for Concrete cover of Buttress BII BIV 18 & 19 Zone 1E (wadi area) (as highlighted)
Geotextile sheet and Screed under Strip footing Between PC 2-4-6-8 Zone 1A
Steel Reinforcement for BUTTRESS BII BIV 100, 101, 102 Zone 2K 2L
Inspection and compaction test 1st layer for backfilling around Pilecap 118 (as highlighted) Zone 2D SP#
2nd Coat Cementitious Waterproofing for Kicker & Above of Remaining Boundary wall (Inner Side), at
Surface Preparation prior to Waterproofing for Foundation & Kicker (Inner Face) of Outer Canopy 3, a
Screed Protection 50mm thk. on Blinding under foundation at Grid (A-B/1-2), (A/2-7), (A/16-21) & (20
Geo-Textile Protection Layer on Blinding under foundation at Grid (A-B/1-2), (A/2-7), (A/16-21) & (20
Single Layer Water proofing membrane 4mm thk. on Blinding under foundation at Grid (A-B/1-2), (A/2-
Inspection of Plastering for Internal walls of Passage (GF-5000 D), at Grid (9-15/Q&R) at Management
Plaster Guide Points & Accessories for Internal walls Inside Office (GF-5067 & GF-5079B) and Service
Sealant filling for New Conctrol Joints (02 no's) on Parapet wall (External Side) at Grid (12-17/W) at
Applying Crack filler to Cracks for repair (3 No's) on Parapet wall (External Side) at Grid (12-17/W)
Installation of Rock and Boulder No. RB-309 (2nd Layer) (2 of 4)
Installation of Rock and Boulder No. RB-108 - 4th Layer (4 of 8)
Excavation for Fire & Security Distribution Line from (B/FS/24 to B/FS/36-P2) at Zone-B as highlighted i
Excavation for Fire Water Line at Zone-K as highlighted in the attached drawing
Excavation for Telecommunication Line from (B/TL/21 to B/TL/36-P2) at Zone-B as highlighted in the at
Excavation for Potable Water Line at Zone-K as highlighted in the attached drawing
Mock up installation of variable air volume box (VAV)(VAV-0-5-1-C) in Management Bldg. as per hli
"Inspection and Compaction Test for Backfilling (5th Layer) for Storm Water Line from MH-D-03 to MH-D-0
"Inspection and Compaction Test for Backfilling (2nd Layer) for Storm Water Line from MH-D-03 to MH-D-
"Inspection and Compaction Test for Backfilling (2nd Layer) for Storm Water Line from MH-D-01 to Outfall
Inspection and Compaction Test for 3rd Layer (3 of 3) Backfilling under Bouder No. RB-169 (Stock Pile # 1
Installation of straight UPVC conduit (Dia.32mm) for Power (Twin Switched Socket Outlet & Fused Con
Inspection and Compaction Test for 2nd Layer (2 of 3) Backfilling under Bouder No. RB-169b (Stock Pile #
"Inpection of Casting Concrete for Short Piece & Surface Preperation prior to start waterproofing a
"Inspection and Compaction Test for Backfilling (6th Layer) for Storm Water Line from MH-D-01-A1 to MH
Installation of straight UPVC conduit (Dia. 25mm) and Box for Fire Alarm (Speaker) at the Crescent-01
"Inspection and Compaction Test for Backfilling (5th Layer) for Storm Water Line from MH-D-01-A1 to MH
INSPECTION FOR MANHOLE BASE INSTALLATION, PIPE CONNECTION AND CASTING CONCRETE FOR SHORT P
Installation of straight conduit UPVC conduit (Dia.32mm) and Box for Security (CAM) at the Physic Gard
"INSPECTION FOR MANHOLE BASE INSTALLATION AND UPVC PIPE CONNECTION FOR - FW1-3, FW6-1, FW9
Installation of straight conduit UPVC conduit (Dia.32mm) and Box for Voice and Data (WIFI & CAM) at t
INSPECTION FOR MANHOLE BASE INSTALLATION AND UPVC PIPE CONNECTION FOR - FW1-2.3 (As Highlig
Surface Preparation Prior to start Backfilling around Pilecap 118 as highlighted Zone 2D
Inspection and compaction test 4th layer for backfilling around Strip footing and PC 112-114-116 (as hi
Inspection and compaction test 3rd layer for backfilling around Strip footing and PC 103 - 105 (as highl
Inspection and compaction test 2nd layer for backfilling around Strip footing and PC 117 (as highlighted
Steel Reinforcement and installation of Anchor bolts and base plate for Ring Beam Axis 02-1, 02AW to
Level and location for BUTTRESS BII 68 & 69 (2nd) zone 2C
Shuttering and Shear Connector for BUTTRESS BII 68 & 69 (2nd) zone 2C
Concreting for BUTTRESS BII 68 & 69 (2nd) zone 2C
Installation of ETFE System (Mock-Up)
Installation of Rock and Boulder No. RB-309 (1st Layer)
Installation of Rock and Boulder No. RB-062 (2nd Layer)
Excavation for Fire & Security Distribution Line from (B/FS/24 to B/FS/36) at Zone-B as highlighted in t
Excavation for Telecommunication Line from (B/TL/21 to B/TL/36) at Zone-B as highlighted in the attac
"Inspection and Compaction Test for Backfilling (6th Layer) for Storm Water Line from MH-D-01 to MH-D-0
Excavation & Bed Preparation for Sub surface Drainage Sub line & Sleeves Pipes (250mm drop to 16
"Inspection and Compaction Test for Backfilling (3rd Layer) for Storm Water Line from MH-D-01 to MH-D-
Excavation & Bed Preparation for Sub surface Drainage Sub line & Sleeves Pipes (250mm drop to 1
"Inspection and Compaction Test for Backfilling (2nd Layer) for Storm Water Line from MH-D-01-B1 to M
Excavation & Bed Preparation for Sub surface Drainage Main line Pipes (800mm from MH-C-1 to MH-
"Inspection and Compaction Test for Backfilling (4th Layer) for Storm Water Line from MH-D-03 to MH-D-0
Solvent Base Primer Coating prior to Membrane Waterproofing on Blinding under foundation at Grid (A
"Inspection and Compaction Test for Backfilling (1st Layer) for Storm Water Line from MH-D-03 to MH-D-0
"Inspection and Compaction Test for Backfilling (1st Layer) for Storm Water Line from MH-D-01 to Outfall
Concrete Pouring & Shuttering for Kicker (1st Lift) of Straight Wall 'A' (Right Side) and 2 Walls (Curv
Coordinates & Levels for Kicker (1st Lift) of Straight Wall 'A' (Right Side) and 2 Walls (Curved) along
Surface Preparation Prior to Stone Cladding for Boundary wall (Outer Side) of Whispering Cave 2, @
Inspection and Compaction Test for Sub-Base (1 of 1) under Bouder No. RB-311 (Stock Pile # 109 A-1-A)
Inspection and Compaction Test for Sub-Base (1 of 1) under 5th lift of Rock Boulder no. RB-108 (Stock Pi
Inspection and Compaction Test for 2nd Layer (2 of 3) Backfilling under Bouder No. RB-169 (Stock Pile #
Inspection and Compaction Test for 1st Layer (1 of 3) Backfilling under Bouder No. RB-169b (Stock Pile #
Excavation for Potable Water Line at Zone-B as highlighted in the attached drawing
1st Coat Cementitious Waterproofing for Kicker & Above of Remaining Boundary wall (Inner Side), at
Surface Preparation Prior to Stone Cladding for Remaining Boundary wall (Inner & Outer Sides & Both
Inspection and compaction test 3rd layer for backfilling around Strip footing and PC 112-114-116 (as hi
Openning of New Conctrol Joints (02 no's) on Parapet wall (External Side) at Grid (12-17/W) at Manag
Inspection and compaction test 1st layer for backfilling around Strip footing and PC 112-114-116 (as hi
Openning of Cracks for repair (3 No's) on Parapet wall (External Side) at Grid (12-17/W) at Managemen
Inspection and compaction test 2nd layer for backfilling around Strip footing and PC 103 - 105 (as highl
Inspection and compaction test 1st layer for backfilling around Strip footing and PC 117 (as highlighted
Concreting for BUTTRESS BOV 16, 17 Zone 1D 1E
Concreting for BUTTRESS BIV 70-71 (FULL) & BII 70-71 (1st) Zone 2C 2D (AS HIGHLIGHTED)
Level and location for BUTTRESS BOV BIV 12 & 13 zone 1C 1D
Steel Reinforcement for Perimeter Wall at AXIS 02-2, 02AQ to 02AR Between BOI BOV 113 - 114 Zone 2N
Steel Reinforcement for BUTTRESS BII BIV 4, 5, 6, 7 zone 1A 1B
Inspection and Compaction Test for 1st Layer (1 of 3) Backfilling under Bouder No. RB-169 (Stock Pile # 1
Inspection and Compaction Test for 1st Layer (1 of 1) Backfilling under Bouder No. RB-311 (Stock Pile # 1
Inspection and Compaction Test for 1st Layer (1 of 1) Backfilling under 5th lift of Rock Boulder no. RB-1
Inspection and Compaction Test for Sub-Base (1 of 1) under 6th lift of Rock Boulder no. RB-109 (Stock Pi
Inspection and Compaction Test for 1st Layer (1 of 1) Backfilling under 6th lift of Rock Boulder no. RB-1
Inspection of Spatter Dash (Rough Coat) Prior to Internal Plastering for walls of Passage at Grid (9'
Surface preparation prior to Waterproofing on Blinding under foundation at Grid (A-B/1-2), (A/2-7), (
Surface Preparation prior to Waterproofing for Foundation of Remaining Boundary wall (Inner Side) a
Steel Reinforcement for Wall & Buttress upto bottom of Ring Beam @ Grid (3-14/Left. Side), of Bounda
Installation of Rock and Boulder No. RB-109 - 5th Layer (5 of 7)
Steel Reinforcement for Ring Beam @ Grid (3-14/Left. Side) or 37 to 48, on Boundary wall at Aviary G
Steel Reinforcement for Walls of Plant Room at Discovery Garden at highlighted area in attached Dra
Steel Reinforcement for Walls of Circular Walls (8, 9 & 10) Half Part 1, inside Maze garden, as per hi
Coordinates & Levels of Kicker (2nd Lift) for Plant room at Discovery Garden at highlighted area in at
Level and location for BUTTRESS BOV BOI 4, 5, 7 (1st) zone 1A 1B
Level and location for BUTTRESS BIV 70-71 (FULL) & BII 70-71 (1st) Zone 2C 2D (AS HIGHLIGHTED)
Level and location for PILECAPS 59, 61, 63 ZONE 1J 1K
Level and location for PILECAPS 66 & 68 ZONE 1L 1K
Level and location for BUTTRESS BOV 126 (2nd) ZONE 2R
Level and location for BUTTRESS BOI 127 (2nd) ZONE 2R
Concreting for BUTTRESS BOV BOI 4, 5, 7 (1st) zone 1A 1B
Shuttering and Shear connector for BUTTRESS BOV BOI 4, 5, 7 (1st) zone 1A 1B
Steel Reinforcement for BOV BOI 10 & 11 zone 1C
Shuttering for BUTTRESS BIV 70-71 (FULL) & BII 70-71 (1st) Zone 2C 2D (AS HIGHLIGHTED)
Concreting for PILECAPS 59, 61, 63 Zone 1K 1J
Shuttering for PILECAPS 59, 61, 63 Zone 1K 1J
Steel Reinforcement for PILECAPS 59, 61, 63 Zone 1K 1J
Concreting for PILECAPS 66 & 68 Zone 1K 1L
Shuttering for PILECAPS 66 & 68 Zone 1K 1L
Steel Reinforcement for PILECAPS 66 & 68 Zone 1K 1L
Concreting for BUTTRESS BOV 126 (2nd) Zone 2R
Shuttering for BUTTRESS BOV 126 (2nd) Zone 2R
Concreting for BUTTRESS BOI 127 (2nd) Zone 2R
Shuttering for BUTTRESS BOI 127 (2nd) Zone 2R
Installation of UPVC straight conduit (Dia.25mm) and Box for Fire Alarm (Flashing Beacon & Brea
'Pipe Installation for sub surface drainage (main line) (size: 450, 400, 315, 250 mm Ø) and (160 & 1
Inspection of Grouting (Vertical Joints) for Rock Boulder RB-304 - for All Layers
Level, Location For Excavation of Strip Footing Between PC 32-34-36-38 Zone 1F as Highlighted
Level, Location For Excavation of Strip Footing Between PC 37-39-41-43-45 Zone 1G as Highlighted
Surface Preperation prior to start waterproofing and Application of Primer (1st Coat, 2nd Coat and
Inspection and compaction test 1st layer for backfilling around Strip footing and PC 103 - 105 (as highli
INSPECTION FOR MANHOLE BASE INSTALLATION AND UPVC PIPE CONNECTION FOR - FW-A-13, FW-A-14, F
Inspection and compaction test 2nd layer for backfilling around Strip footing and PC 112-114-116 (as hi
Soil Preparation under Boulder No. RB- 311
Surface Preparation Prior to start Backfilling around Strip footing & Pilecap 117 as highlighted Zone 2D
Inpection of Casting Concrete for Short Piece & Surface Preperation prior to start waterproofing an
Excavation (as per instruction of DAR) for the loose Exsisting NGL in between PC 162 - 164 at Zone 2L (a
Soil Preparation under Boulder No. RB- 169b
"INSPECTION FOR CASTING CONRETE FOR SHORT PIECE OF MANHOLE - FW-A-18, FW-A-19 (As Highlight
Inspection for Installation of Rings (Riser) upto bottom of slab for (MH-A-06, MH-A-13, MH-A-15) - As Hi
"Inspection and Compaction Test for Backfilling (1st Layer) for Storm Water Line from MH-E-03 to MH-E-0
Surface Preparation Prior to start Backfilling around Pilecap and Strip Footing Between PC 110, 112, 11
Protection layer of 4mm thick modified bituminous protection board for PILECAPS 118 Zone 2E
Single layer of 4mm thick modified bituminous water rpoofing membrane for PILECAPS 118 Zone 2E
Concrete pouring for Encasement of Shot piece's of Manholes (Type 'B' 6 no's) Inside Physic garden, a
2nd Coat Cementitious Waterproofing for Kicker & Above of Remaining Boundary wall (Outer Side & Bo
Concreting of Slab of TUNNEL 2 Zone 6
Solvent Base Primer Coating prior to Membrane Waterproofing for Foundation of Boundary wall (Oute
Concrete Pouring & Shuttering for Footing of Straight Wall 'A' (Right Side) at Entrance, inside Maze g
Protection Layer 4mm thk Bitumenous Protection Board for Foundation of Boundary wall (Outer Sides
"Inspection and Compaction Test for Backfilling (1st Layer) for Storm Water Line from MH-E-02 to MH-E-0
Protection Layer 4mm thk Bitumenous Protection Board for Foundation of Boundary wall (Outer Sides
"Inspection and Compaction Test for Backfilling (1st Layer) for Storm Water Line from MH-E-01 to MH-E-0
Steel Reinforcement for MCPE 1 Wall at axis 03-2, 02AP to 02AM (as highlighted) Zone 2N 2M
Gravel 3/8 Bedding & Geotextile Surround for Sub-Surface Main line (315 400 & 450mm) From Geyser
Surface Preparation and Solvent base primer for Strip footing between PC 168-170, 172-174-176 Zone 2
"Inspection and Compaction Test for Backfilling (1st Layer) for Storm Water Line from MH-E-01-1 to MH-E
"Inspection and Compaction Test for Backfilling (1st Layer) for Storm Water Line from MH-E-01 to MH-E-0
"Inspection and Compaction Test for Backfilling (2nd Layer) for Storm Water Line from MH-D-01 to MH-D-
INSPECTION FOR MANHOLE BASE INSTALLATION AND PIPE CONNECTION FOR MANHOLE - MH-A-06 (As Hi
Concrete pouring for Blinding under foundation at Grid (A/1-21) @ Butterfly Garden, at highlighted a
Coordinates & Levels of Blinding under foundation at Grid (A/1-21) @ Butterfly Garden, at highlighte
Excavation & Surface Preparation upto Bottom of Blinding level under Tunnel foundation at Grid (A-1-
2nd Coat Damp proofing for Foundation of Boundary wall (Outer Sides) @ Span 70, 71, 72 & 73, As pe
1st Coat Damp proofing for Foundation of Boundary wall (Outer Sides) @ Span 70, 71, 72 & 73, As pe
2nd Coat Damp proofing for Foundation of Boundary wall (Outer Sides) @ Span 67C, 68A, 68B & 69, A
1st Coat Cementitious Waterproofing for Kicker & Above of Remaining Boundary wall (Outer Side & Bo
Surface Preparation prior to Waterproofing for Foundation & Wall (Outer Face) of Outer Canopy 3, at
Coordinates & Levels for Footing of Straight Wall 'A' (Right Side) at Entrance, inside Maze garden, as
Plaster Guide Points & Accessories for Internal walls Inside Entance Lobby (GF-5068) & First Aid (GF-
Concrete Pouring & Shuttering for Kicker (2nd Lift) of Plant room at Discovery Garden at highlighted
300 mm Gravel 3/8" Backfilling and Geotextile for Storm Water Line Outfall-D for (250mmØ-UPVC-
Coordinates & Levels for Walls of Circular Walls (6 & 7) Half Part 1, inside Maze garden, as per highli
Steel Reinforcement for Perimeter Wall at AXIS 02-2, 02AT to 02AS Between BOI BOV 115 - 116 Zone 2N
Steel Reinforcement for Slab of Tunnel 2 Zone 2F
Installation of straight UPVC conduit (Dia.32mm Socket Outlet) for Power at the Crescent -01 (Axis 01/
Concreting for Strip footing Between PC 166 - 168 Zone 2M
Shuttering for Strip footing Between PC 166 - 168 Zone 2M
Soil Preparation under Boulder No. RB- 169
Steel Reinforcement for Strip footing Between PC 166 - 168 Zone 2M
"Inspection and Compaction Test for Sub-Base (1 of 1) under Bouder No. RB-244 (Stock Pile # 109 A-1-A
Inspection and Compaction Test for Sub-Base (1 of 1) under Bouder No. RB-309 (Stock Pile # 109 A-1-A)
Inspection and Compaction Test for 3rd Layer (3 of 3) Backfilling under Bouder No. RB-309 (Stock Pile # 1
Inspection of Grouting (Vertical Joints) for Rock Boulder RB-307a - for All Layers
Inspection of Grouting (Vertical Joints) for Rock Boulder RB-297 - for All Layers
Installation of straight UPVC conduit (Dia.32mm Socket Outlet) for Power at the Crescent -01 (Axis 01/
Installation of earthing clamps with conductor 70mm (1pc.) for earthing reinforcement steel re-bar at C
Installation of straight UPVC conduit (Dia.32mm Socket Outlet) for Power at the Crescent -01 (Axis 01
Installation of earthing clamps with conductor 70mm (1pc.) for earthing reinforcement steel re-bar at
Concreting for PILECAPS 54 Zone 1H
1st Coat Damp proofing for Foundation of Boundary wall (Outer Sides) @ Span 67C, 68A, 68B & 69, As
Primer Coating prior to Damp proofing for Foundation of Boundary wall (Outer Sides) @ Span 67C, 68
Plaster Guide Points & Accessories for Internal walls of Laboratory (GF-5029), at Grid (10-12/R-W) a
Stone Cladding for Boundary wall (Outer Face) @ Span 45 & 46 of Water Garden, at Highlighted area
Concrete Pouring & shuttering for Walls of Circular Walls (6 & 7) Half Part 1, inside Maze garden, as p
Surface Preparation prior to Waterproofing for Foundation of Boundary wall (Outer Side) of Whisperi
Concreting for BUTTRESS BOI BOV 126 (1st) Zone 2R
Inspection of Spatter Dash (Rough Coat) Prior to Internal Plastering for walls of Reception (GF-5000)
SHuttering for BUTTRESS BOI BOV 126 (1st) Zone 2R
Inspection of Internal Plastering for walls of Passage, Lobby GF-5000 B & Secretary Office GF-5011,
Steel reinforcement for BUTTRESS BOI BOV 18, 19 Zone 1E
Plaster Guide Points & Accessories for Internal walls of Passage, at Grid (9'-9/N-X) at Management Bui
Surface Preparation prior to Waterproofing for Foundation of Remaining Boundary wall (Outer Side &
Installation of straight UPVC conduit (Dia. 25mm) and Box for Fire Alarm (Speaker) at the Crescent-01 (
Installation of straight UPVC conduit (Dia. 25mm) and Box for Security (CAM) at the Crescent-01 (Axis 0
Installation of straight UPVC conduit (Dia. 25mm) and Box for Voice and Data (WIFI&CAM) at the Crescen
Installation of straight UPVC conduit (Dia.32mm Socket Outlet) for Power at the Crescent -01 (Axis 01/
Installation of Rock and Boulder No. RB-108 - 3rd Layer (3 of 7)
Installation of Rock and Boulder No. RB-109 - 4th Layer (4 of 7)
Excavation for Storm Water Line from G-E-01 to Outfall E, including Manhole and Outfall E as Highlighte
"Inspection for Casting the Blinding Concrete under the Manhole (MH-A-01, MH-A-02, MH-A-03, MH-A
Excavation for Fire Water Line at Zone-B as highlighted in the attached drawing
Inspection and Compaction Test for 2nd Layer (2 of 3) Backfilling under Bouder No. RB-309 (Stock Pile #
Inspection and Compaction Test for Sub-Base (1 of 1) under 4th lift of Rock Boulder no. RB-108 (Stock Pi
Soil Preparation under Boulder No. RB- 244
"Surface Preperation prior to start waterproofing and Application of Primer (1st Coat, 2nd Coat and 3r
"INSPECTION FOR MANHOLE BASE INSTALLATION AND UPVC PIPE CONNECTION FOR - MH-D-01-A1, MH-D-
Inspection and Compaction Test for 1st Layer (1 of 3) Backfilling under Bouder No. RB-309 (Stock Pile # 1
"Inspection for Casting the Blinding Concrete under the Manhole (MH-D-03-01) as Highlighted"
"Inspection and Compaction Test for Backfilling (9th Layer) for Storm Water Line from MH-D-08 to MH-D-
"INSPECTION FOR MANHOLE BASE INSTALLATION, UPVC PIPE CONNECTION AND CASTING CONCRETE FOR SH
Level and location for BUTTRESS BIV 14, 15, 16, 17 ZONE 1D 1E
Level and location for BUTTRESS BOV 16, 17 ZONE 1D 1E
Level and location for BUTTRESS BOV 14 & 15 Zone 1D
Concreting for BUTTRESS BIV 14, 15, 16, 17 Zone 1D 1E
Shuttering for BUTTRESS BIV 14, 15, 16, 17 Zone 1D 1E
Concreting for BUTTRESS BOV 14, 15 Zone 1D
Shuttering for BUTTRESS BOV 16, 17 Zone 1D 1E
Steel Reinforcement and installation of Anchor bolts and base plate for Ring Beam Axis 02-1, 02AW to
Level and location for PILECAPS 65 & 70 Zone 1L 1K
Concreting for PILECAPS 65 & 70 Zone 1K 1L
Shuttering for PILECAPS 65 & 70 Zone 1K 1L
Steel Reinforcement for PILECAPS 65 & 70 Zone 1K 1L
Steel Reinforcement for BUTTRESS BIV (vertical only) 12 & 13 Zone 1C 1D
Concreting for BUTTRESS BOI 128 (2nd) Zone 2R
Concreting for BUTTRESS BII 128 (2nd) Zone 2R
Concreting for BUTTRESS BOV 127 (2nd) Zone 2R
Steel Reinforcement for PILECAPS 74, 78 Zone 1N 1M
Installation of UPVC straight conduit (Dia.25mm) and Box for Fire Alarm (Flashing Beacon) at the M
Installation of earthing clamps with conductor 70mm (1pc.) for earthing reinforcement steel re-bar at
Installation of earthing clamps with conductor 70mm (5pcs.) for earthing reinforcement steel re-bar
Installation of Rock and Boulder No. RB-335 (3rd Layer) (3 of 3)
Inspection of Grouting (Vertical Joints) for Rock Boulder RB-307 - for All Layers
Excavation for Fire Water Line at Zone-B as highlighted in the attached drawing
Inspection and Compaction Test for Sub-Base (1 of 1) under 5th lift of Rock Boulder no. RB-109 (Stock Pi
Inspection and Compaction Test for 1st Layer (1 of 1) Backfilling under 4th lift of Rock Boulder no. RB-1
Inspection and Compaction Test for 1st Layer (1 of 1) Backfilling under 5th lift of Rock Boulder no. RB-1
Installation of UPVC conduit (Dia.32mm 2Pcs. Each Socket Outlet & 25mm 1pc. Each CCTV) for Power
Installation of straight UPVC conduit (Dia.32mm Socket Outlet) for Power at the Crescent -02 (Axis 0
Installation of straight UPVC conduit (Dia.32mm Socket Outlet) for Power at the Crescent -02 (Axis 02
Level and location for Excavation of Strip footing Between PC 31, 33, 35, 37 Zone 1F
Grouting for Stone Cladding of Boundary wall (Inner Side) at Span 59, 61A & 61B and Column's C59, C
Level and location for PILECAPS 54, 56, 58 Zone 1J 1H
Surface Preparation Prior to start Backfilling around Pilecap and Strip Footing Between PC 103 - 105 as
Inspection of Spatter Dash (Rough Coat) Prior to Internal Plastering for walls of Passage (GF-5000 D)
Geotextile sheet and Screed under Strip footing Between PC 2-4-6-8 Zone 1A
Pipe Sleeve Installation for Strip Footing Pipes (160mmØ-UPVC-CL-4), At Crescent-1, Zone 1F, As pe
Steel Reinforcement for Perimeter Wall at AXIS 02-2, 02AS to 02AR Between BOI BOV 114 - 115 Zone 2N
Protection layer of 4mm thick bituminous protection board for Central Bridge Foundation Zone 2L
Two Water Proofing Membrane for Central Bridge Foundation Zone 2L
Steel Reinforcement for BUTTRESS BII BIV 100, 101, 102 Zone 2K 2L
Concreting for PILECAPS 56, 58 Zone 1J 1H
Bedding of Gravel 3/8" and Geotextile surrounding Storm Water Line Outfall-F for (400mmØ-UPVC-
Pipe Installation for Storm Water Line Outfall-E for (600mmØ-PP- CORRUGATED) from (MH-E-01 to
Bedding of Gravel 3/8" and Geotextile surrounding Storm Water Line Outfall-E for (600mmØ-PP- C
Shuttering for PILECAPS 54, 56, 58 Zone 1J 1H
Steel Reinforcement for PILECAPS 54, 56, 58 Zone 1J 1H
Plaster Guide Points & Accessories for Internal walls of Reception (GF-5000), at Grid (14-19/Q-W) at
Installation of Rock and Boulder No. RB-335 (2nd Layer) (2 of 3)
Installation of Rock and Boulder No. RB-109 - 3rd Layer (3 of 7)
Installation of Rock and Boulder No. RB-108 - 2nd Layer (2 of 7)
Installation of Rock and Boulder No. RB-335 (1st Layer) (1 of 3)
Installation of Rock and Boulder No. RB-304 (4th Layer) (4 of 4)
Installation of Rock and Boulder No. RB-304 (3rd Layer) (3 of 4)
Installation of Rock and Boulder No. RB-304 (2nd Layer) (2 of 4)
Level and location for PILECAPS 67 & 69 Zone 1L
Steel Reinforcement for BUTTRESS BOI BOV 69 Zone 2C
INSPECTION FOR MANHOLE BASE INSTALLATION AND UPVC PIPE CONNECTION FOR - MH-D-06 (As Highli
Concrerting for PILECAPS 67 & 69 Zone 1L
Soil Preparation under Boulder No. RB- 309
Shuttering for PILECAPS 67 & 69 Zone 1L
"Inspection and Compaction Test for Backfilling (1st Layer) for Storm Water Line from MH-E-03 to MH-E-0
"Inspection and Compaction Test for Backfilling (1st Layer) for Storm Water Line from MH-E-02 to MH-E-0
Steel Reinforcement for PILECAPS 67 & 69 Zone 1L
Protection layer of 4mm thick bituminous protection board for Pilecaps 71, 73, 75, 77 Zone 1M
"Inspection and Compaction Test for Backfilling (1st Layer) for Storm Water Line from MH-E-01 to MH-E-0
Single layer of 4mm thick modified bituminous waterproofing membrane for Pilecaps 71, 73, 75, 77 Zo
"Inspection and Compaction Test for Backfilling (1st Layer) for Storm Water Line from MH-E-01-1 to MH-E
Protection layer of 4mm thick bituminous protection board for Pilecaps 46, 48, 50 Zone 1H 1G
"Inspection and Compaction Test for Backfilling (1st Layer) for Storm Water Line from MH-E-01 to MH-E-0
Single layer of 4mm thick modified bituminous waterproofing membrane for Pilecaps 46, 48, 50 Zone 1
"Inspection and Compaction Test for Backfilling (5th Layer) for Storm Water Line from MH-D-01 to MH-D-0
Surface Preparation and solvent base primer for Pilecaps 46, 48, 50 Zone 1H 1G
Protection layer of 4mm thick bituminous protection board for Pilecaps 45, 47, 49, 51 Zone 1H 1G
"Inspection and Compaction Test for Backfilling (2nd Layer) for Storm Water Line from MH-D-01 to MH-D-
Single layer of modified bituminous waterproofing membrane for Pilecaps 45, 47, 49, 51 Zone 1H 1G
"Inspection and Compaction Test for Backfilling (4th Layer) for Storm Water Line from MH-D-01-A1 to MH
Protection layer of 4mm thick bituminous protection board for Pilecaps 31, 33, 35, 38, 40, 42, 44 Zone
"Inspection and Compaction Test for Backfilling (5th Layer) for Storm Water Line from MH-D-01-A1 to MH
"Soil Preparation at Zone - 6A prior to start Cut and removal of cutting material and backfilling upto (
Steel Reinforcement for Slab & Beam of Whispering Cave 2, @ Sound & Light Garden, At highlighted
Grouting for Stone Cladding of Boundary wall (Inner Side) at Span 60A & 60B and Column's C60A, C60B
Excavation & Bed Preparation for Sub surface Sleeves 03 no's (110mm) at Bottom Side of Planted bed
Warning Tape Installation for Storm Water Line Outfall-D for (600mmØ-PP- CORRUGATED) from (MH
300 mm Gravel 3/8" Backfilling and Geotextile for Storm Water Line Outfall-D for (600mmØ-PP- C
Warning Tape Installation for Storm Water Line Outfall-D for (250mmØ-UPVC- Class 4) from (MH-D-
Warning Tape Installation for Foul Water Line for (315mmØ-UPVC- Class 4) from (FW-A-13 to FW-A-15
300 mm Gravel 3/8" Backfilling and Geotextile for Foul Water Line for (315mmØ-UPVC- Class 4) from
Warning Tape Installation for Foul Water Line (250mmØ-UPVC- Class 4) from (FW-A-3-6 to FW-A-3-7)
300 mm Gravel 3/8" Backfilling and Geotextile for Foul Water Line (250mmØ-UPVC- Class 4) from (FW
Inspection and compaction test 6th layer for backfilling at Zone 2D around PC and strip footing -109-1
Inspection and compaction test 1st layer for backfilling around PC 162 Zone 2L (as highlighted) (1 of 4 l
Surface Preparation Prior to start Backfilling around Pilecap and Strip Footing Between PC 110, 112, 11
Level and location for BUTTRESS BOI BOV 126 (1st) Zone 2R
Level and location for BUTTRESS BOI 124 & 125 (2nd) Zone 2Q
Level and location for PILECAPS 53, 55, 57 Zone 1H 1J
Steel Reinforcement for BUTTRESS BOI BOV 12 & 13 ZONE 1C 1D
Concreting for BUTTRESS BOI 124 & 125 (2nd) Zone 2Q
Shuttering for BUTTRESS BOI 124 & 125 (2nd) Zone 2Q
Concreting of Slab of TUNNEL 2 Zone 6
Concreting for PILECAPS 53, 55, 57 Zone 1H 1J
Shuttering for PILECAPS 53, 55, 57 Zone 1H 1J
Steel Reinforcement for PILECAPS 53, 55, 57 Zone 1H 1J
2nd Coat Damp proofing for Encasement of Shot piece's & Blinding top, of Manholes (Type 'A' 4 no's)
Inspection of Plastering for walls of Passage (GF-5000 C) at Grid (9-15/E-F) & (B-H/10-10') at Manage
Coordinates & Levels of Blinding under foundation at Grid (A/1-21) @ Butterfly Garden, at highlighte
Concrete Pouring & Shuttering for Walls of Circular Wall (1) and Straight walls (3 no's), inside Maze g
Coordinates & Levels for Walls of Circular Wall (1) and Straight walls (3 no's), inside Maze garden, as
Concrete Pouring & Shuttering for Wall & Columns of Outer Canopy 2 at Physic Garden, as per highlig
Coordinates & Levels of Wall & Columns for Outer Canopy 2 at Physic Garden, as per highlighted area
Installation and Fixation of Base plates & Anchor Bolts and Check Coordinates & Levels for Outer Can
Excavation & Surface Preparation upto Bottom of Blinding level under Tunnel foundation at Grid (A-1-
Concrete pouring & Shuttering for Kicker (1st Lift) of Plant room at Discovery Garden at highlighted a
1st Coat Damp proofing for Encasement of Shot piece's & Blinding top, of Manholes (Type 'A' 4 no's)
Steel Reinforcement for Columns & Wall of Outer Canopy 1 at Physic Garden, as per highlighted area
Steel Reinforcement for Footing & Kicker of Straight Wall (Right Side) at Entrance, inside Maze garden
Concrete pouring & Shuttering for Footing of 2 Walls (Curved) along the Boundary wall at Entrance, i
Installation of Rock and Boulder No. RB-304 (1st Layer)
Inspection of Grouting (Vertical Joints) for Rock Boulder RB-308a - for All Layers
Inspection for Casting the Blinding Concrete under the SBC-06 (as Highlighted)
Inspection and Compaction Test for Sub-Base (1 of 1) under 4th lift of Rock Boulder no. RB-109 (Stock Pi
Inspection and Compaction Test for Sub-base (1 of 1) under 3rd lift of Rock Boulder no. RB-108 (Stock Pi
"Inspection of Manhole Base Installation, Pipe Connection and Casting Concrete for Short Piece of Fo
Installation of straight UPVC conduit (Dia.32mm) for Power (Socket Outlet) at the Crescent-01 (Axis 0
Installation of earthing clamps with conductor 70mm (1pc.) for earthing reinforcement steel re-bar at
Installation of straight UPVC conduit (Dia. 25mm) and Box for Security (CAM) at the Crescent-01 (Axis
Installation of straight UPVC conduit (Dia. 25mm) and Box for Voice and Data (WIFI & CAM) at the Cres
Installation of straight UPVC conduit (Dia. 25mm) and Box for Fire Alarm (Speaker) at the Crescent-01 (
Inspection of Grouting (Vertical Joints) for Rock Boulder RB-308 - for All Layers
Installation of Rock and Boulder No. RB-297 (4th Layer) (4 of 4)
Installation of Rock and Boulder No. RB-297 (3rd Layer) (3 of 4)
Installation of Rock and Boulder No. RB-108 - 1st Layer (1 of 7)
Installation of Rock and Boulder No. RB-109 - 2nd Layer (2 of 7)
Installation of Rock and Boulder No. RB-297 (2nd Layer) (2 of 4)
INSPECTION FOR MANHOLE BASE INSTALLATION AND UPVC PIPE CONNECTION FOR - FW-A-18, FW-A-19 (A
Inspection and Compaction Test for Sub-Base (1 of 1) under Bouder No. RB-335 (Stock Pile # 109 A-1-A)
"Inspection and Compaction Test for Backfilling (4th Layer) for Storm Water Line from MH-D-07 to MH-D-
"Inspection and Compaction Test for Backfilling (5th Layer) for Storm Water Line from MH-D-08-01 to MH
"Inspection and Compaction Test for Backfilling (10th Layer) for Storm Water Line from MH-D-08 to MH-D
INSPECTION FOR MANHOLE BASE INSTALLATION AND UPVC PIPE CONNECTION FOR - FW-A-3-6.2, FW-A-3-6
Stone Cladding for Boundary wall (Inner Face) @ Span 18, As per Attached Highlighted Drawing's.
Excavation ( -75cm ) from Asphalt Level at Parking Area at Zone-3B as per the attached Drawing and Sur
"Inspection and Compaction Test for Backfilling (4th Layer) for Storm Water Line from MH-D-01 to MH-D-0
Surface Preparation prior to Waterproofing for Foundation of Boundary wall (Outer Sides) @ Span 67
Base Primer Coating prior to Damp proofing for Foundation of Boundary wall (Outer Sides) @ Span 70,
Plaster Guide Points & Accessories for walls of Passage (GF-5000 D), at Grid (9-15/Q&R) at Managemen
Inspection of Spatter Dash (Rough Coat) Prior to Internal Plastering for walls of Passage, Lobby GF-
Excavation ( -75cm ) from Asphalt Level at Zone-4B as per the attached Drawing and Survey Report (Fr
Level and location for Slab of Tunnel 2 Zone 2F
Surface Preparation and Solvent Base Primer for Central Bridge Foundation Zone 2L
Steel Reinforcement for BUTTRESS BII BIV 18 & 19 Zone
Shuttering for Slab of Tunnel 2 Zone 2F
Steel Reinforcement for Slab of Tunnel 2 Zone 2F
Installation of straight UPVC conduit (Dia.32mm) for Power (Socket Outlet) at the Crescent-01 (Axis 01
Installation of straight UPVC conduit (Dia. 25mm) and Box for Fire Alarm (Speaker) at the Crescent-01 (
Steel Reinforcement for Walls of Circular Walls (6 & 7) Half Part 1, inside Maze garden, as per highli
Coordinates & Levels for Footing of 2 Walls (Curved) along the Boundary wall at Entrance, inside Maze
Steel Reinforcement for Footing & Kicker of 2 Walls (Curved) along the Boundary wall at Entrance, in
Concrete pouring & Shuttering for Slab & Beam of Whispering Cave 2, @ Sound & Light Garden, At hig
Coordinates & Levels for Slab & Beam of Whispering Cave 2, @ Sound & Light Garden, At highlighted
Screed Protection 50mm thk. on Blinding under foundation at Grid (2-20/B) Inside Butterfly Garden, a
Concrete Pouring & Shuttering for Wall of Remaining Boundary wall at Discovery Garden at highlighte
Coordinates & Levels for Wall of Remaining Boundary wall at Discovery Garden at highlighted area in
Primer Coating Prior to Damp proofing for Encasement of Shot piece's & Blinding top, of Manholes (Ty
Surface Preparation Prior to Waterproofing for Encasement of Shot piece's & Blinding top, of Manholes
Installation of stub-up UPVC conduit (Dia. 32mm) for Power (Twin Socket) at the Maze Garden as per at
Inspection of Grouting (Vertical Joints) for Rock Boulder RB-296 - for All Layers
Notification to Start Boulder Construction for Boulder RB-108 and RB-109 as per attached Approved Dra
INSPECTION FOR MANHOLE BASE INSTALLATION AND UPVC PIPE CONNECTION FOR - MH-B-02, MH-B-03 (
Inspection and Compaction Test for 1st Layer (1 of 1) Backfilling under 4th lift of Rock Boulder no. RB-1
Inspection and Compaction Test for 1st Layer (1 of 1) Backfilling under 3rd lift of Rock Boulder no. RB-1
Inpection of Casting Concrete for Short Piece & Surface Preperation prior to start waterproofing and
Level and location for Strip Footing Between PC 166 - 168 Zone 2M
Inspection for Casting the Blinding Concrete under the Manhole (MH-E-01, MH-E-01-1, MH-E-01-2, MH
Concreting for Strip footing Between PC 166 - 168 Zone 2M
"Inspection for Casting the Blinding Concrete under the Manhole FW-A-13, FW-A-14 (as Highlighted)"
Shuttering for Strip footing Between PC 166 - 168 Zone 2M
"Inspection and Compaction Test for Backfilling (3rd Layer) for Storm Water Line from MH-D-01-A1 to MH
"Inspection and Compaction Test for Backfilling (4th Layer) for Storm Water Line from MH-D-01-A1 to MH
Inspection and Compaction Test for Sub-Base (1 of 1) under Bouder No. RB-304 (Stock Pile # 109 A-1-A)
Soil Preparation under Boulder No. RB- 335
Steel Reinforcement for Strip footing Between PC 166 - 168 Zone 2M
Surface Preparation Prior to start Backfilling around Pilecap 162 as highlighted Zone 2L (for 4 Lifts)
Surface Preparation and Solvent base primer for PILECAPS 71, 73, 75, 77 Zone 1L 1M
Surface Preparation and Solvent base primer for PILECAPS 45, 47, 49, 51 Zone 1G 1H
Concreting for Mass Concrete of Strip Footing Between PC 134-136-138-140 Zone 2G
Inspection and compaction test 2nd layer for backfilling of PC and Stripfooting PC 134-136-138-140 Zone
Inspection and compaction test 5th layer for backfilling at Zone 2D around PC and strip footing -109-1
Inspection and compaction test 4th layer for backfilling at Zone 2Q around PC 190 (as Highlighted) (4
Inspection and compaction test 1std layer for backfilling of PC and Stripfooting PC 134-136-138-140 Zone
Excavation & Surface preparation at 1st layer of Stone Boulders (Part 1) Inside Water Garden, At Hig
Surface Preparation prior to Waterproofing for Grade Beam (Outer Face) at Grid (A/3-9) at Managemen
Surface Preparation prior to Waterproofing for Foundation of Boundary wall (Outer Sides) @ Span 70,
Single Layer Water proofing membrane 4mm thk. for Foundations & Columns (Upto 500mm height) (All s
Inspection and compaction test 4th layer for backfilling at Zone 2D around PC and strip footing -109-1
Level and location for BUTTRESS BOV 14 & 15 Zone 1D
Installation of Rock and Boulder No. RB-297 (1st Layer)
Shuttering for BUTTRESS BOV 14 & 15 Zone 1D
"INSPECTION FOR MANHOLE BASE INSTALLATION AND UPVC PIPE CONNECTION FOR - MH-D-02, MH-D-03,
Steel Reinforcement for BUTTRESS BII BIV, BOI BOV 16 & 17 Zone 1D 1E
"Inspection and Compaction Test for Backfilling (1st Layer) for Storm Water Line from MH-D-01-A1 to MH
"Inspection and Compaction Test for Backfilling (4th Layer) for Storm Water Line from MH-D-01 to MH-D-
Inspection for the Excavation of Storm Box Culvert - SBC-06 (As Highlighted)
Inspection and Compaction Test for Sub-Base (1 of 1) under 2nd lift of Rock Boulder no. RB-108 (Stock P
Concreting for BUTTRESS BIV 68 & 69 (2nd) Zone 2C
Inspection and Compaction Test for 1st Layer (1 of 1) Backfilling under 2nd lift of Rock Boulder no. RB-1
Shuttering for BUTTRESS BIV 68 & 69 (2nd) Zone 2C
Inspection and Compaction Test for 2nd Layer (2 of 2) Backfilling under Bouder No. RB-304 (Stock Pile #
Anti Termite Under Mass Concrete of Strip Footing Between PC 134-136-138-140 Zone 2G
Inspection and Compaction Test for 1st Layer (1 of 1) Backfilling under 3rd lift of Rock Boulder no. RB-1
Protection layer of 4mm thick bituminous protection board for Pilecap 176, 178, 180, 182 zone 2N
Inspection and Compaction Test for 1st Layer (1 of 2) Backfilling under Bouder No. RB-304 (Stock Pile # 1
Single layer of 4mm thick modified bituminous WP membrane for Pilecap 176, 178, 180, 182 zone 2N
"Inspection and Compaction Test for Backfilling (7th Layer) for Storm Water Line from MH-D-02 to MH-D-
Soil Preparation at Zone - 6B prior to start Excavation (-20 cm) from FGL - as highlighted (Excluding RB-14
Pipe Installation for Foul Water Line for (315mmØ-UPVC- Class 4) from (FW-A-13 to FW-A-15). BESI
Bedding of Gravel 3/8" and Geotextile surrounding Foul Water Line for (315mmØ-UPVC- Class 4) fro
Pipe Installation for Foul Water Line (250mmØ-UPVC- Class 4) from (FW-A-3-6 to FW-A-3-7). BESIDE
Bedding of Gravel 3/8" and Geotextile surrounding Foul Water Line (250mmØ-UPVC- Class 4) from (F
Pipe Installation for Storm Water Line Outfall-D for (250mmØ-UPVC- Class 4) from (MH-D-03 to MH
Bedding of Gravel 3/8" and Geotextile surrounding Storm Water Line Outfall-D for (250mmØ-UPVC-
Installation of straight UPVC conduit (Dia.32mm) for Power (Socket Outlet) at the Crescent-01 (Axis 01
Installation of straight UPVC conduit (Dia.32mm) for Power (Socket Outlet) at the Crescent-01 (Axis 01
Concreting for BUTTRESS BOI 128 (2nd) Zone 2R
Shuttering for BUTTRESS BOI 128 (2nd) Zone 2R
Installation of Rock and Boulder No. RB-109 - 1st Layer (1 of 7)
Concreting for BUTTRESS BII 128 (2nd) Zone 2R
Inspection of Grouting (Vertical Joints) for Rock Boulder RB-298 - for All Layers
Shuttering for BUTTRESS BII 128 (2nd) Zone 2R
"Inspection for Casting the Blinding Concrete under the Manhole FW-A-3-6, FW-A-3-7 (as Highlighted)"
Concreting for BUTTRESS BOV 127 (2nd) Zone 2R
Inspection and Compaction Test for Sub-Base (1 of 1) under 3rd lift of Rock Boulder no. RB-109 (Stock Pi
Shuttering for BUTTRESS BOV 127 (2nd) Zone 2R
Concreting for PILECAPS 72, 76 Zone 1M
"Inspection and Compaction Test for Backfilling (2nd Layer) for Storm Water Line from MH-D-01-A1 to M
"Inspection and Compaction Test for Backfilling (3rd Layer) for Storm Water Line from MH-D-01-A1 to MH
INSPECTION OF CASTING CONCRETE FOR SHORT PIECE FOR STORM WATER LINE, MANHOLE - G-X-7, G-A-08
Shuttering for PILECAPS 72, 76 Zone 1M
"Inspection and Compaction Test for Backfilling (9th Layer) for Storm Water Line from MH-D-08 to MH-D-
Steel Reinforcement for PILECAPS 72, 76 Zone 1M
Excavation for Storm Water Line from MH-D-01 to Outfall-D, including Outfall D (As Highlighted)
Concreting for PILECAP 77 Zone 1N
Concreting for BUTRESS BOI 99, 100, 101, 102 Zone 2K 2L
Shuttering for BUTRESS BOI 99, 100, 101, 102 Zone 2K 2L
Steel Reinforcement for PILECAPS 74, 78 Zone 1N 1M
Steel Reinforcement for SRTIP FOOTING RC Between PC 174-172, 170-68 Zone 2M, PC 176-174 Zone 2N
Concreting for PILECAPS 74, 78 Zone 1N 1M
Concretring for SRTIP FOOTING RC Between PC 174-172, 170-68 Zone 2M, PC 176-174 Zone 2N
Shuttering for SRTIP FOOTING RC Between PC 174-172, 170-68 Zone 2M, PC 176-174 Zone 2N
Shuttering for PILECAPS 74, 78 Zone 1N 1M
Concreting for BUTRESS BIV 99 Zone 2K
Shuttering for BUTRESS BIV 99 Zone 2K
Concreting for PILECAP 48, 52 Zone 1H
Inspection and compaction test 3rd layer for backfilling at Zone 2D around PC and strip footing -109-1
Steel Reinforcement for BUTTRESS BOI BOV 69 Zone 2C
Concreting for MCPE 2 Foundation Axis 02AD to 03K Zone 2J 2K
Level and location for BUTTRESS BOI 128 (2nd) Zone 2R
Level and location for BUTTRESS BII 128 (2nd) Zone 2R
Level and location for BUTTRESS BOV 127 (2nd) Zone 2R
Level and location for PILECAPS 72, 76 Zone 1M
Level and location for SRTIP FOOTING RC Between PC 174-172, 170-68 Zone 2M, PC 176-174 Zone 2N
Level and location for BUTTRESS BOI 99, 100, 101, 102 Zone 2K 2L
Level and location for BUTTRESS BIV 99 Zone 2K
Level and location for PILECAPS 74, 78 Zone 1N 1M
Steel Reinforcement for Walls of Circular Wall (1) and Straight walls (3 no's), inside Maze garden, as
Concrete Pouring & Shuttering for Wall & Columns of Outer Canopy 3 at Physic Garden, as per highlig
Concrete pouring for Blinding of Footings (6 no's) Inside Physic Garden, at highlighted area in attach
Installation and Fixation of Base plates & Anchor Bolts and Check Coordinates & Levels for Outer Can
Coordinates & Levels of Wall & Columns for Outer Canopy 3 at Physic Garden, as per highlighted area
Coordinates & Levels for Walls of Circular Walls (2, 3, 4 & 5) inside Maze garden, as per highlighted a
Geo-Textile Protection Layer on Blinding under foundation at Grid (2-20/B) Inside Butterfly Garden, a
Single Layer Water proofing membrane 4mm thk. on Blinding under foundation at Grid (2-20/B) Inside
Inspection and Compaction Test for Sub-Base (1 of 1) under Bouder No. RB-297 (Stock Pile # 109 A-1-A)
Soil Preparation under Boulder No. RB- 304
Steel Reinforcement for Slab of Whispering Cave 2, @ Sound & Light Garden, At highlighted area in
"Inspection and Compaction Test for Backfilling (3rd Layer) for Storm Water Line from MH-D-01 to MH-D-0
"Inspection and Compaction Test for Backfilling (3rd Layer) for Storm Water Line from MH-D-01 to MH-D-0
"Inspection and Compaction Test for Backfilling (6th Layer) for Storm Water Line from MH-D-02 to MH-D-0
Concrete Pouring & Shuttering for Walls of Circular Walls (2, 3, 4 & 5) inside Maze garden, as per hig
Solvent Base Primer Coating prior to Waterproofing Membrane on Blinding under foundation at Grid (2
Excavation & Bed Preparation for Sub surface Drainage Main line (450mm) (from MH-C-4 to MH-C-5 to
Surface preparation prior to Waterproofing on Blinding under foundation at Grid (2-20/B) Inside Butte
Inspection of Grouting (Vertical Joints) for Rock Boulder RB-154 - for All Layers
Inspection of Grouting (Vertical Joints) for Rock Boulder RB-333 - for All Layers
"Excavation for Storm Water Line Gullies G-F-04, G-F-15, G-F-16, G-F-17, G-F-18, G-F-19, G-F-20, G-F-
"Inspection for Casting the Blinding Concrete under the Gullies (G-E-01, G-E-02, G-E-03, G-E-04, G-E-05,
"Inspection and Compaction Test for Backfilling (6th Layer) for Storm Water Line from MH-D-06 to MH-D-0
"Inspection and Compaction Test for Backfilling (3rd Layer) for Storm Water Line from MH-D-07 to MH-D-0
"Inspection and Compaction Test for Backfilling (2nd Layer) for Storm Water Line from MH-D-01-A1 to MH
"Inspection and Compaction Test for Backfilling (1st Layer) for Storm Water Line from MH-D-01-A1 to MH
Inspection and Compaction Test for 2nd Layer (2 of 2) Backfilling under 2nd lift of Rock Boulder no. RB-
Inspection and Compaction Test for 1st Layer (1 of 2) Backfilling under 2nd lift of Rock Boulder no. RB-1
Inspection and Compaction Test for 4th Layer (4 of 4) Backfilling under Bouder No. RB-297 (Stock Pile # 1
"Inspection and Compaction Test for Sub-Base (1 of 1) under Bouder No.RB-108 (Stock Pile # 109 A-1-A
"Inspection and Compaction Test for Backfilling (9th Layer) for Storm Water Line from MH-D-08 to MH-D-0
Inspection of Concrete Pouring for the Beam of Seating Area (1) at Zone-G (SA-10) As Highlighted
"Inspection of formwork for the Beam of Seating Area (1) at Zone-G (SA-10) As Highlighted"
Inspection of Steel Reinforcement for the Beam of Seating Area (1) at Zone-G (SA-10) As Highlighted
Level and location for PILECAP 73 Zone 1M
Level and location for PILECAP 77 Zone 1N
Shuttering for PILECAP 77 Zone 1N
Steel Reinforcement for PILECAP 77 Zone 1N
Geotextile and 30mm thick Screed under Strip footing Between PC 134-136-138-140 Zone 2G
Repairing of Expansion joint for Buttress at Axis 02-1, 02-AW to close NCR KAIG3-NCR-CO-A-0002-00
Repairing of Expansion joint for Buttress at Axis 02-1, 02-AT to close SI KAIG3-SI-CO-A-0025-00
Repairing of Expansion joint for Buttress at Axis 02-1, 02-2, 02-AL, 02-AP to close SI KAIG3-SI-CO-A-0
Inspection and compaction test 2nd layer for backfilling at Zone 2D around PC and strip footing -109
Surface Preparation prior to start Backfilling for PC and Stripfooting PC 134-136-138-140 Zone 2G
Level and Location for Existing level for start backfilling strip footing Between PC 134-136-138-140 Zo
Inspection and Compaction Test 4th Layer for Backfilling at Zone 1A Outer (4th of 4th layer) As Highl
Steel Reinforcement for PILECAP 46, 48, 50, 52 Zone 1H 1G
Shuttering for PILECAP 46, 48, 50, 52 Zone 1H 1G
Concreting for PILECAP 46, 50 Zone 1H 1G
Level and location for PILECAP 46, 48, 50, 52 Zone 1G 1H
Installation of UPVC conduit sleeves (Dia.75mm) for LV Ductbank (Normal Lighting & Spare) at the Pl
Installation of straight UPVC conduit (Dia.32mm) for Power (Socket Outlet) at the Crescent-01 (Axis 01
Installation of straight UPVC conduit (Dia.32mm) for Power (Socket Outlet) at the Crescent-01 (Axis 01
Installation of UPVC conduit sleeves (Dia. 75mm) for Low Current Duct Bank (SM Fiber Optic Cables &
Installation of straight UPVC conduit (Dia. 25mm) and Box for Security CAM) at the Crescent-01 (Axis 0
Installation of straight UPVC conduit (Dia. 25mm) and Box for Voice and Data (WIFI&CAM) at the Cresce
Installation of straight UPVC conduit (Dia. 25mm) and Box for Fire Alarm (Speaker) at the Crescent-01 (
Installation of straight UPVC conduit (Dia. 25mm) and Box for Security (CAM) at the Crescent-01 (Axis 0
Installation of straight UPVC conduit (Dia. 25mm) and Box for Voice and Data (WIFI & CAM) at the Cresc
Installation of straight UPVC conduit (Dia. 25mm) and Box for Fire Alarm (Speaker) at the Crescent-01 (
Excavation & Surface Preparation Prior to Blinding under Innerside Tunnel foundation @ Butterfly Gar
Gravel 3/8 Bedding & Geotextile Surround for Sub-Surface Main line (400, 315 & 250mm) Between Ge
Inspection of Grouting (Vertical Joints) for Rock Boulder RB-332 - for All Layers
Inspection of Grouting (Vertical Joints) for Rock Boulder RB-331 - for All Layers
Inspection of Grouting (Vertical Joints) for Rock Boulder RB-330 - for All Layers
Inspection of Grouting (Vertical Joints) for Rock Boulder No. RB-329 - for All Layers
Inspection and Compaction Test for 3rd Layer (3 of 5) Backfilling under Bouder No. RB-297 (Stock Pile # 1
Concrete pouring for Blindings Under Foundations of 4 Walls at the Entrance Boundary wall inside Ma
Coordinates & Levels of Blindings Under Foundations of 2 Walls at the Entrance Boundary wall inside
Inspection & Compaction tests after Excavation for Foundation of 2 Walls at the Entrance Boundary wa
Concrete pouring & Shuttering for Kicker (1st Lift) of Plant room at Discovery Garden at highlighted a
Coordinates & Levels of Kicker (1st Lift) for Plant room at Discovery Garden at highlighted area in at
Inspection & Compaction tests of Backfilling (1 layer out of 1) Under the Foundation of Plant Room at
Plaster Guide Points & Accessories for walls of Passage, Lobby GF-5000 B & Secretary Office GF-5011,
Excavation & Surface Preparation for Foundation of 2 Walls at the Entrance Boundary wall inside Maze
Concreting for PILECAP 73 Zone 1M
Shuttering for PILE CAP 73 at Zone 1M
Steel Reinforcement for Pile Cap 73 at Zone 1M
Installation of Box and UPVC straight conduit (Dia.25mm) for Power (13A Cleaner Socket & 13A T
Installation of UPVC straight conduit (Dia.25mm) and Box for Voice and Data (Data & Telephone) at
Concrete Pouring & Shuttering for Kicker of Circular Walls (6, 7, 8, 9 & 10) Half Part 2, inside Maze ga
Coordinates & Levels of Kicker of Circular Walls (6, 7, 8, 9 & 10) Half Part 2, inside Maze garden, as p
Excavation & Soil preparation prior to Backfilling Under the Foundation of Plant Room at Physic Garde
Coordinates & Levels of Blinding for Footings (6 no's) Inside Physic Garden, at highlighted area in at
Excavation & Surface preparation for Footings (6 no's) Inside Physic Garden, at highlighted area in a
Level and location for BUTTRESS BOI 75 & 76 Zone 2D & 2E
Level and location for BUTTRESS BOV 128 (2nd) Zone 2R
Level and location for BUTTRESS 127 (1st) Zone 2R
Level and location for PILECAPS 45, 47, 49, 51 Zone 1H 1G
Inspection and compaction test 1st layer for backfilling at Zone 2D around PC and strip footing -109-1
Shuttering for BUTTRESS BOI 75 & 76 Zone 2D & 2E
Concreting for BUTTRESS BOI 75 & 76 Zone 2D & 2E
Shuttering for BUTTRESS BII 128 (1st) Zone 2R
Surface Preparation and Solvent Base Primer under Stripfooting between PC 7-9-11-13 Zone 1B
Steel Reinforcement for Butress BII BIV 70 Zone 2C
Concreting for BUTTRESS BOV 128 (2nd) Zone 2R
Shuttering for BUTTRESS BOV 128 (2nd) Zone 2R
Concreting for BUTTRESS BOV 124 & 125 (2nd) Zone 2Q
Concreting for BUTTRESS BOI BOV 127 (1st) Zone 2R
Shuttering for BUTTRESS BOI BOV 127 (1st) Zone 2R
Concreting for pilecaps 45, 47, 49, 51 Zone 1H 1G
Shuttering for pilecaps 45, 47, 49, 51 Zone 1H 1G
Installation of Box and UPVC straight conduit (Dia.25mm) for Power (13A Cleaner Socket & Wall
Steel Reinforcement for pilecaps 45, 47, 49, 51 Zone 1H 1G
Protection layer of 4mm thick bituminous protection board for Pilecaps 37, 39, 41, 43 Zone 1G
Single layer of 4mm thick modified bituminous water proofing membrane for Pilecaps 37, 39, 41, 43 Zo
"Inspection and Compaction Test for Sub-Base (1 of 1) under Bouder No.RB-109 (Stock Pile # 109 A-1-A
"Inspection for Casting the Blinding Concrete under the Manhole (MH-D-01-A1, MH-D-01-A1-01, MH-D
Soil Preparation at Zone - 6A prior to start Cut and removal of disposal material and backfilling upto (-
"Inspection and Compaction Test for 2nd Layer (2 of 4) Backfilling under Bouder No. RB-297 (Stock Pile #
Soil Preparation at Zone - 6B prior to start Excavation (-20 cm) from FGL - as highlighted
"Inspection and Compaction Test for Backfilling (4th Layer) for Storm Water Line from MH-D-08-01 to MH
"Inspection and Compaction Test for Backfilling (5th Layer) for Storm Water Line from MH-D-02 to MH-D-0
"Inspection and Compaction Test for Backfilling (1st Layer) for Storm Water Line from MH-D-01-A1 to MH
"Inspection and Compaction Test for Backfilling (5th Layer) for Storm Water Line from MH-D-06 to MH-D-0
"Inspection and Compaction Test for 3rd Layer (3 of 3) Backfilling under Bouder No. RB-109 (Stock Pile #
Installation of Rock and Boulder No. RB-333 (4th Layer) (4 of 4)
Installation of Rock and Boulder No. RB-333 (3rd Layer) (3 of 4)
Installation of UPVC straight conduit (Dia.25mm) and Box for Security (Card Reader & Door Release)
Pipe Installation for Storm Water Line Outfall-D for (600mmØ-PP- CORRUGATED) from (MH-D-01 to
Bedding of Gravel 3/8" and Geotextile surrounding Storm Water Line Outfall-D for (600mmØ-PP-
Warning Tape Installation for Storm Water Line Outfall-E for (400mmØ-UPVC- CLASS 4) from (MH-E-
300 mm Gravel 3/8" Backfilling and Geotextile for Storm Water Line Outfall-E for (400mmØ-UPVC-
Warning Tape Installation for Storm Water Line Outfall-E for (400mmØ-UPVC- CLASS 4) from (MH-E-
300 mm Gravel 3/8" Backfilling and Geotextile for Storm Water Line Outfall-E for (400mmØ-UPVC-
Warning Tape Installation for Storm Water Line Outfall-E for (400mmØ-UPVC- CLASS 4) from (MH-E-
300 mm Gravel 3/8" Backfilling and Geotextile for Storm Water Line Outfall-E for (400mmØ-UPVC-
Warning Tape Installation for Storm Water Line Outfall-D for (315mmØ-UPVC- Class 4) from (MH-
300 mm Gravel 3/8" Backfilling and Geotextile for Storm Water Line Outfall-D for (315mmØ-UPVC-
Warning Tape Installation for Storm Water Line Outfall-D for (315mmØ-UPVC- Class 4) 98m Length
300 mm Gravel 3/8" Backfilling and Geotextile for Storm Water Line Outfall-D for (315mmØ-UPVC-
Warning Tape Installation for Storm Water Line Outfall-E for (400mmØ-UPVC- CLASS 4) 102 m Lengt
300 mm Gravel 3/8" Backfilling and Geotextile for Storm Water Line Outfall-E for (400mmØ-UPVC-
Warning Tape Installation for Storm Water Line Outfall-D for (315mmØ-UPVC- Class 4) 76m Length
300 mm Gravel 3/8" Backfilling and Geotextile for Storm Water Line Outfall-D for (315mmØ-UPVC-
Warning Tape Installation for Storm Water Line Outfall-D for (250mmØ-UPVC- Class 4) 53m Length
300 mm Gravel 3/8" Backfilling and Geotextile for Storm Water Line Outfall-D for (250mmØ-UPVC-
Concrete Pouring for Blinding under foundation at Grid (2-20/B & 14/B-B') Inside Butterfly Garden, as
Coordinates & Top level of Blinding under foundation at Grid (2-20/B & 14/B-B') Inside Butterfly Gard
Protection layer Bitumenous Protection board after Damp proofing for Boundary wall foundation (Ou
Protection layer Bitumenous Protection board after Damp proofing for Boundary wall foundation (Out
Stone Cladding for Boundary wall (Inner Face) @ Span 49 of Water Garden, at Highlighted area in At
Stone Cladding for Boundary wall (Inner Face) @ Span 48 of Water Garden, at Highlighted area in At
Stone Cladding for Boundary wall (Inner Face) @ Span 42 of Water Garden, at Highlighted area in At
Stone Cladding for Boundary wall (Outer Face) @ Span 42 of Water Garden, at Highlighted area in At
Stone Cladding for Boundary wall (Outer Face) @ Span 41 of Water Garden, at Highlighted area in At
Solvent Base Primer Coating for Foundations & Columns (Upto 500mm height) (All sides) at Back of Ho
Inspection of Flooring Guide Points & Top Level of Screed flooring at Grid (3-6/A-E) Inside Mechan
Steel Reinforcement for Walls of Circular Walls (1, 2, 3, 4 & 5) inside Maze garden, as per highlighted
Concrete pouring for Encasement of Shot piece's of Manholes (Type 'A' 4 no's) Inside Maze garden, as
"Inspection and Compaction Test for Backfilling (3rd Layer) for Storm Water Line from MH-D-03 to MH-D-0
"Inspection and Compaction Test for 1st Layer (1 of 4) Backfilling under Bouder No. RB-297 (Stock Pile #
"Inspection and Compaction Test for 2nd Layer (2 of 2) Backfilling under Bouder No. RB-108 (Stock Pile #
"Excavation for Storm Water Line Gullies G-F-01, G-F-02, G-F-03, G-F-04, G-F-05, G-F-06, G-F-07, G-F-0
Excavation for Foul Water Line from FW-A-3-6 to FW-A-3-7 including the Manhole FW-A-3-6 and FW-A-3-7
"Excavation for Foul Water Line from FW-A-13 to FW-A-15 including the Manhole FW-A-13, FW-A-14, FW-
INSPECTION FOR MANHOLE BASE INSTALLATION, UPVC PIPE CONNECTION AND CASTING CONCRETE FOR S
Inpection of Manhole Base Installation, UPVC Pipe Connection and Casting Concrete for Short Piece (F
Inspection and Compaction Test 3rd Layer for Backfilling at Zone 1A Outer (3rd of 4th layer) As Highlight
Inspection and compaction test 3rd layer for backfilling at Zone 2E PC and Strip Footing PC-120-122-124
Level and location for BUTTRESS BOV 124 & 125 (2nd) Zone 2Q
Level and location for PILECAPS 71 & 75 Zone 1M
Shuttering for BUTTRESS BOV 124 & 125 (2nd) Zone 2Q
Geotextile sheet and 30 mm thick screed protection under Strip footing Between PC 120 - 122 - 124 - 1
Single layer of 4mm thick modified bituminous waterproofing membrane under Strip footing Between
Concreting for PILECAPS 71 & 75 Zone 1M
Shuttering for PILECAPS 71 & 75 Zone 1M
Steel Reinforcement for PILECAPS 71 & 75 Zone 1M
Excavation and Removal of Disposal Materials ( -75cm ) from Asphalt Level at Zone-4B as per the att
Soil Preparation under Boulder No. RB- 108 after Excavation
"Inspection and Compaction Test for Backfilling (2nd Layer) for Storm Water Line from MH-D-07 to MH-D-
"Inspection and Compaction Test for Backfilling (2nd Layer) for Storm Water Line from MH-D-01 to MH-D-0
"Inspection and Compaction Test for Backfilling (2nd Layer) for Storm Water Line from MH-D-01 to MH-D-
"Inspection and Compaction Test for Backfilling (4th Layer) for Storm Water Line from MH-D-02 to MH-D-0
"Excavation for Storm Water Line Gullies, G-H-1, G-H-2, G-H-3, G-H-4, G-H-5, G-H-6, G-H-7, G-H-8, G-
"Inspection and Compaction Test for 1st Layer (1 of 2) Backfilling under Bouder No. RB-108 (Stock Pile #
"Inspection and Compaction Test for 3rd Layer (3 of 3) Backfilling under Bouder No. RB-109 (Stock Pile #
Soil Preparation under Boulder No. RB- 297
Installation of Rock and Boulder No. RB-332 (4th Layer)
Installation of Rock and Boulder No. RB-333 (2nd Layer)
"INSPECTION FOR MANHOLE BASE INSTALLATION, UPVC PIPE CONNECTION AND CASTING CONCRETE FOR SH
Protection layer of 4mm thick mdified bituminous protection board for PILECAPS 139, 140, 142, 144 Zo
Protection layer of 4mm thick modified bituminous protection board for PILECAPS 118 Zone 2E
Single layer of 4mm thick modified bituminous water rpoofing membrane for PILECAPS 118 Zone 2E
Surface preparation and solvent base primer for PILECAPS 139, 140, 142, 144 Zone 2H
Protection layer of 4mm thick bituminous protection board for RC strip footing between PC 8-10-12-14
Single layer of 4mm thick modified bituminous waterproofing membrane for RC strip footing between
Surface preparation and solvent base primer for RC strip footing between PC 8-10-12-14 Zone 1B
Protection layer of 4mm thick bituminous protection board for PILECAPS 20, 22, 24 Zone 1D
Single layer of 4mm thick modified bituminous waterproofing membrane for PILECAPS 20, 22, 24 Zone
Protection layer of geo-textile and 30mm screed protection under Strip footing Between PC 7-9-11-13
Single layer o 4mm thick modified bituminous waterproofing membrane under Strip footing Between P
Surface Preparation and Solvent base primer under Strip footing Between PC 134-136-138-140 Zone 2G
Aluminium Flashing & Sealant for water proofing on Foundation of Boundary wall (Inner Face) at Grid (
Slated layer 4mm thk Modified Bituminous water proofing membrane for Foundation of Boundary wall (I
Inspection of External Plastering for walls at Water Feature at Grid (10-13/F-Q) or Court Yard at Man
Check the Executed Backfilling for the highlighted area as per the attached RFT's, RFI's at Zone 2Q Cresc
Check the Executed Backfilling for the highlighted area Around PC 190 as per the attached RFT's, RFI's
Check the Executed Backfilling for the highlighted area as per the attached RFT's, RFI's at Zone 2Q Cresc
Check the Executed Backfilling for the highlighted area as per the attached RFT's, RFI's at Zone 2Q Cre
Check the Executed Backfilling for the highlighted area as per the attached RFT's, RFI's at Zone 2C Cresce
Check the Executed Backfilling for the highlighted area as per the attached RFT's, RFI's at Zone 2C Cresc
Check the Executed Backfilling for the highlighted area as per the attached RFT's, RFI's at Zone 2C Cresc
Protection layer of 4mm thick bituminous protection board for Strip footing Between PC 96-98, 91-93-
Single layer of 4mm thick modified bituminous waterproofing membrane for Strip footing Between PC
Installation of straight UPVC conduit (Dia.32mm) for Power (Socket Outlet) at the Crescent-01 (Axis 01
Installation of UPVC conduit sleeves (Dia. 160mm) for LV Ductbank (Submain Cables) at the Plant Room
Installation of UPVC conduit sleeves (Dia. 110mm) for Low Current Duct Bank (ICT Cables) as per attac
Installation of straight UPVC conduit (Dia. 25mm) and Box for Fire Alarm (Speaker) at the Crescent-01 (
Installation of UPVC straight conduit (Dia.25mm) and Box for Security (Card Reader & Door Release
Installation of Rock and Boulder No. RB-332 (3rd Layer)
Installation of Rock and Boulder No. RB-333 (1st Layer)
Installation of Rock and Boulder No. RB-330 (4th Layer)
Installation of Rock and Boulder No. RB-332 (2nd Layer)
"Inspection and Compaction Test for 2nd Layer (2 of 3) Backfilling under Bouder No. RB-109 (Stock Pile #
"Inspection and Compaction Test for Backfilling (4th Layer) for Storm Water Line from MH-D-06 to MH-D-0
"Inspection and Compaction Test for Backfilling (8th Layer) for Storm Water Line from MH-D-08 to MH-D-0
"Inspection and Compaction Test for Backfilling (9th Layer) for Storm Water Line from MH-D-08 to MH-D-0
Soil Preparation under Boulder No. RB- 108
Installation of UPVC straight conduit (Dia.25mm) and Box for Security (Card Reader) at the Maintena
Excavation & Surface Preparation Prior to Blinding under Innerside Tunnel foundation @ Butterfly Gar
Surface Preparation Prior to start Backfilling around Pilecap & Strip footing (109-111-113-115 as highli
Level and location for BUTTRESS BIV 68 & 69 (2nd) Zone 2C
Level and location for BUTTRESS BOV 99, 100, 101, 102 Zone 2L 2K
Level and Location for Existing level for start backfilling strip footing Between PC 109-111-113-115 Zone
Level and location for BUTTRESS BOI 65 (2nd) Zone 2B
Concreting for BUTTRESS BIV 68 & 69 (2nd) Zone 2C
Shuttering for BUTTRESS BIV 68 & 69 (2nd) Zone 2C
Surface Preparation and Solvent base primer for Strip footing Between PC 96-98, 91-93-95-97 Zone 2A
Concreting for BUTTRESS BOV 99, 100, 101, 102 Zone 2L 2K
Shuttering for BUTTRESS BOV 99, 100, 101, 102 Zone 2L 2K
Concreting for BUTTRESS BOI 65 (2nd) Zone 2B
Shuttering for BUTTRESS BOI 65 (2nd) Zone 2B
Installation of Rock and Boulder No. RB-331 (4th Layer)
Inspection and compaction test 4th layer for backfilling at Zone 2H PC-139, 141 (as Highlighted) (PC 4
Surface Preparation and Solvent base primer for PILECAPS 37, 39, 41, 43 ZONE 1G
Concreting for BUTTRESS BOI BOV 128 (1st) Zone 2R
Shuttering for BUTTRESS BOI BOV 128 (1st) Zone 2R
Pipe Installation of sub-surface drainage main line pipes; 315mmØ & 250mmØ & 110mm Ø & 400 mm
Surface Preparation prior to Water proofing for Foundations & Columns (Upto 500mm height) (All sides
Concrete pouring & Shuttering of Footings of Circular Walls (6, 7, 8, 9 & 10) Half Part 2, inside Maze
Steel Reinforcement for Wall of Remaining Boundary wall at Discovery Garden at highlighted area in
Inspection of Spatter Dash (Rough Coat) Prior to Internal Plastering for walls of Passage (GF-5000 C)
Notification & Check for coordinates of Tree Pits (21 no's) Prior to Excavation at along the Geyser G
Excavation & Bed Preparation for Sub surface Drainage Main line (400 & 315mm) & (MH-C-7 & MH-C-8
Excavation of Tree pits (2 no's) beside the Entrance walls and Marking of remaining Tree pits (3no's)
Notification to Start Grading as highlighted in the attached drawing, including Cut and Removal of Di
Excavation and Removal of Disposal Materials upto (-20cm ) from Finishing Level near Water Garden
Installation of Rock and Boulder No. RB-330 (3rd Layer)
Installation of Rock and Boulder No. RB-298 (4th Layer)
"Inspection and Compaction Test for 1st Layer (1 of 3) Backfilling under Bouder No. RB-109 (Stock Pile #
"Inspection and Compaction Test for Backfilling (3rd Layer) for Storm Water Line from MH-D-08-01 to MH
"Inspection and Compaction Test for Backfilling (3rd Layer) for Storm Water Line from MH-D-02 to MH-D-0
Pipe Installation of Storm Water Line Outfall-D for (315mmØ-UPVC- Class 4) from (MH-D-01-B1 t
Bedding of Gravel 3/8" and Geotextile surrounding Storm Water Line Outfall-D for (315mmØ-UPVC
Pipe Installation of Storm Water Line Outfall-E for (400mmØ-UPVC- CLASS 4) from (MH-E-01 to MH-
Bedding of Gravel 3/8" and Geotextile surrounding Storm Water Line Outfall-E for (400mmØ-UPVC-
Pipe Installation of Storm Water Line Outfall-E for (400mmØ-UPVC- CLASS 4) from (MH-E-01-1 to M
Bedding of Gravel 3/8" and Geotextile surrounding Storm Water Line Outfall-E for (400mmØ-UPVC-
Pipe Installation of Storm Water Line Outfall-E for (400mmØ-UPVC- CLASS 4) from (MH-E-01 to MH-
Bedding of Gravel 3/8" and Geotextile surrounding Storm Water Line Outfall-E for (400mmØ-UPVC-
Warning Tape Installation for Foul Water Line (315mmØ-UPVC- Class 4) 50m Length from (FW-A-3-6.1
300 mm Gravel 3/8" Backfilling and Geotextile for Foul Water Line (315mmØ-UPVC- Class 4) 50m Len
Installation of Box and UPVC straight conduit (Dia.25mm) for Power (13A Cleaner Socket Outlet) at
Installation of UPVC straight conduit (Dia.25mm) and Box for Fire Alarm (Flashing Beacon,Interfa
Installation of UPVC straight conduit (Dia.25mm) and Box for Voice and Data (Data & Telephone) at
Final Inspection of Erected SteelStructure in Crescent Mock-up.
Level and location for BUTTRESS BII 128 (1st) Zone 2R
Single Layer of 4mm thick modified bituminous waterproofing membrane for PILECAPS 38, 40, 42, 44 Z
Concreting for BUTTRESS BII 128 (1st) Zone 2R
Shuttering for BUTTRESS BII 128 (1st) Zone 2R
Inspection and Compaction Test 3rd Layer for Backfilling at Zone 1A Outer (3rd of 4th layer) As Highlight
Inspection and compaction test 3rd layer for backfilling at Zone 2H PC-139, 141 (as Highlighted) (PC 3
Inspection and compaction test 3rd layer for backfilling at Zone 2E PC and Strip Footing PC-120-122-124
Check the Executed Backfilling for the highlighted area as per the attached RFT's, RFI's at Zone 2R (TIP)
Check the Executed Backfilling for the highlighted area as per the attached RFT's, RFI's at TIP internal
Installation of Rock and Boulder No. RB-298 (3rd Layer)
Installation of Rock and Boulder No. RB-332 (1st Layer)
Installation of Rock and Boulder No. RB-330 (2nd Layer)
Excavation for Storm Water Line Gullies G-E-01, G-E-02, G-E-03, G-E-04, G-E-05, G-E-06, G-E-07, G-E-08,
"Inspection and Compaction Test for Backfilling (2nd Layer) for Storm Water Line from MH-D-04 to MH-D-0
"Inspection and Compaction Test for Backfilling (2nd Layer) for Storm Water Line from MH-D-03 to MH-D-0
"Inspection and Compaction Test for Backfilling (1st Layer) for Storm Water Line from MH-D-01 to MH-D-0
Excavation for Storm Water Line from MH-F-01-1 to MH-F-01-4 Including Manhole MH-F-01-1, MH-F-01-
Soil Preparation under Boulder No. RB- 109
Inspection & Compaction tests of Backfilling 5th (Final) Layer along the Boundary wall (Outer side) at
Inspection & Compaction tests of Backfilling 4th Layer along the Boundary wall (Outer side) at grid EX
Surface Preparation & Levels prior to Backfilling along the Boundary walls (Inner Side) @ Elevation A,
Plaster Guide Points & Accessories for walls of Passage (GF-5000 C) at Grid (9-15/E-F) & (B-H/10-10')
Grouting for Stone Cladding of Boundary wall (Inner Side) Span 43 & 44 and Column's C43 & C44 (All S
Grouting for Stone Cladding of Boundary wall (Inner Side) Span 41 & 42 and Column's C41 & C42 (All S
Grouting for Stone Cladding of Boundary wall (Inner Side) Span 33 & 34 and Column's C33 & C34 (All S
Grouting for Stone Cladding of Boundary wall (Inner Side) Span 31 & 32 and Column's C31 & C32 (All S
Steel Reinforcement for Wall & Buttress upto bottom of Ring Beam @ Grid (3-14/Left. Side), of Bounda
Installation of UPVC straight conduit (Dia.25mm) and Box for Fire Alarm (Speaker,Interface Unit & F
Existing levels prior to Backfilling Sub-Grade at Highlighted area along with seat walls @ Sound & Lig
2nd Coat Bitumenous Damp proofing for Boundary wall foundation (Outer Face) at Elevation "C to A"
1st Coat Bitumenous Damp proofing for Boundary wall foundation (Outer Face) at Elevation "C to A"
Primer Coating prior to Damp proofing for Boundary wall foundation (Outer Face) at Elevation "C to
Surface Preparation prior to Water proofing for Boundary wall foundation (Outer Face) at Elevation
Steel Reinforcement for Columns & Wall of Outer Canopy 2 at Physic Garden, as per highlighted area
Inspection of Spatter Dash (Rough Coat) prior to External Plastering for walls at Water Feature at Gr
Steel Reinforcement for Columns & Wall of Outer Canopy 3 at Physic Garden, as per highlighted area
Level and location for BUTTRESS BOI 75 & 76 Zone 2D & 2E
Protection layer of 4mm thick bituminous protection board for PILECAP 32, 34, 36 Zone 1F
Concreting for BUTTRESS BOI 75 & 76 Zone 2D & 2E
Shuttering for BUTTRESS BOI 75 & 76 Zone 2D & 2E
Concreting for Mass Concrete of Strip Footing Between PC 134-136-138-140 Zone 2G
Inspection and Compaction Test for 4th Layer Subgrade backfill in Zone 1B Strip footing between PC 8-1
Inspection and compaction test 2nd layer for backfilling at Zone 2H PC-139, 141, 143 (as Highlighted)
Surface Preparation Prior to start Backfilling along Strip footing and Pilecap 1-3-5 and tip as highligh
Concrete Pouring & Shuttering for Footing of Plant room at Discovery Garden at highlighted area in a
Inspection of External Plastering at Elevation of Grid (2/K-R) at Management Building, as highlighted
Inspection of Internal Plastering for remaining wall Inside Locker Room & Changing # GF-5059, at Gri
Concrete Pouring & Shuttering for Kicker of Circular Walls (6, 7, 8, 9 & 10) Half Part 1, inside Maze ga
Coordinates & Levels of Kicker of Circular Walls (6, 7, 8, 9 & 10) Half Part 1, inside Maze garden, as p
Installation of Rock and Boulder No. RB-331 (3rd Layer)
"Inspection and Compaction Test for Backfilling (2nd Layer) for Storm Water Line from MH-D-02 to MH-D-0
"Inspection and Compaction Test for Backfilling (7th Layer) for Storm Water Line from MH-D-08 to MH-D-0
"Inspection and Compaction Test for Backfilling (8th Layer) for Storm Water Line from MH-D-08 to MH-D-0
Bedding of Gravel 3/8" and Geotextile surrounding Storm Water Line Outfall-D for (250mmØ-UPVC-
Installation of Rock and Boulder No. RB-331 (2nd Layer)
Installation of Rock and Boulder No. RB-330 (1st Layer)
Installation of Rock and Boulder No. RB-298 (2nd Layer)
Installation of Rock and Boulder No. RB-298 (1st Layer)
"Inspection and Compaction Test for Backfilling (1st Layer) for Storm Water Line from MH-D-01 to MH-D-0
"Inspection and Compaction Test for Sub-base under Bouder No. RB-333 (Stock Pile # 109 A-1-A) "
Inspection and compaction test 2nd layer for backfilling at Zone 2E PC and Strip Footing PC-120-122-12
Inspection and Compaction Test 2nd Layer for Backfilling at Zone 1A Outer (2nd of 4th layer) As Highligh
Level and location for MCPE 2 Foundation Axis 02AD to 03K Zone 2J 2K
Concreting for MCPE 2 Foundation Axis 02AD to 03K Zone 2J 2K
Shuttering for MCPE 2 Foundation Axis 02AD to 03K Zone 2J 2K
Steel Reinforcement for MCPE 2 Foundation Axis 02AD to 03K Zone 2J 2K
Anti Termite Under Mass Concrete of Strip Footing Between PC 134-136-138-140 Zone 2G
Shuttering for Mass Concrete of Strip Footing Between PC 134-136-138-140 Zone 2G
Steel Reinforcement for BUTTRESS BOI BOV 4 & 5 Zone 1A 1B
Concreting for Buttress BII 126 (2nd) Zone 2R
Shuttering fot Buttress BII 126 (2nd) Zone 2R
Protection layer of 4mm thick bituminous protection board for Pilecaps 83, 85, 87 Zone 1P
Single Layer of 4mm thick modified bituminous waterproofing membrane for Pilecaps 83, 85, 87 Zone 1
Surface Preparation and Solvent base primer application for Pilecaps 83, 85, 87 Zone 1P
Steel Reinforcement for BUTTRESS BII BIV 73, 74, 72 zone 2D
Pipe Installation of Storm Water Line Outfall-D for (315mmØ-UPVC- Class 4) 98m Length from (MH-
Bedding of Gravel 3/8" and Geotextile surrounding Storm Water Line Outfall-D for (315mmØ-UPVC-
Pipe Installation of Storm Water Line Outfall-E for (400mmØ-UPVC- CLASS 4) 102 m Length from (M
Bedding of Gravel 3/8" and Geotextile surrounding Storm Water Line Outfall-E for (400mmØ-UPVC-
Pipe Installation of Storm Water Line Outfall-D for (315mmØ-UPVC- Class 4) 76m Length from (MH-
Bedding of Gravel 3/8" and Geotextile surrounding Storm Water Line Outfall-D for (315mmØ-UPVC-
Pipe Installation of Storm Water Line Outfall-D for (250mmØ-UPVC- Class 4) 53m Length from (MH-
Concrete pouring for Blindings of Manholes 4 no's (MH-D-01-B3, MH-D-01-B3-01, MH-D-01-B4 & MH-D-0
Coordinates & Levels of Footing for Plant room at Discovery Garden at highlighted area in attached D
Steel Reinforcement for Footing & Kicker of Plant Room at Discovery Garden at highlighted area in a
Excavation & Surface preparation at 1st layer of Stone Boulders (Part 1) Inside Water Garden, At Hig
Concrete Pouring & Shuttering for Kicker (Inside) 2nd lift for Remaining Boundary wall at Discovery G
Coordinates & Levels of Kicker (Inside) 2nd lift for Remaining Boundary wall at Discovery Garden at h
Excavation & Bed Preparation for Sub surface Drainage Main line (400, 315 & 250mm) Between Geyse
Warning Tape Installation for Storm Water Line Outfall-D for (315mmØ-UPVC- Class 4) 38 m Length
300 mm Gravel 3/8" Backfilling and Geotextile for Storm Water Line Outfall-D for (315mmØ-UPVC-
Level and Location for PILECAPS 37, 39, 41, 43 Zone 1G
Level and Location for As Built - PILECAPS 126 Zone 2E (reference for backfilling)
Inspection for Filling Floor Joints (Horizontal) and Final Completion of Rock and Boulder No. RB-149
Installation of Rock and Boulder No. RB-331 (1st Layer)
Inspection of Concrete Pouring for the Beam of Seating Area (2) at Zone-L (SA-37) As Highlighted
Level and Location for As Built - PILECAPS 139, 141, 143 Zone 2H (reference for backfilling)
"Inspection of formwork for the Beam of Seating Area (2) at Zone-L (SA-37) As Highlighted"
Inspection of Steel Reinforcement for the Beam of Seating Area (2) at Zone-L (SA-37) As Highlighted
"Inspection and Compaction Test for 2nd Layer (2 of 2) Backfilling under Bouder No. RB-333 (Stock Pile #
Inspection and compaction test 1st layer for backfilling at Zone 2H PC-139, 141, 143 (as Highlighted) (
Inspection and compaction test 1st layer for backfilling at Zone 2E PC and Strip Footing PC-120-122-124
Sinle Layer of 4mm Thick Modified bituminous waterproofing membrane for PILECAPS 31, 33, 35 Zone 1
Concreting for the PILECAP 37, 39, 41, 43 Zone 1G
"Inspection and Compaction Test for Sub-base under Bouder No. RB-332 (Stock Pile # 109 A-1-A) "
Shuttering for the PILECAP 37, 39, 41, 43 Zone 1G
Steel Reinforcement for the PILECAP 37, 39, 41, 43 Zone 1G
Surface Preparation and solvent base primer application for PILECAPS 38, 40, 42, 44 Zone 1G
"Inspection and Compaction Test for Backfilling (6th Layer) for Storm Water Line from MH-D-08 to MH-D-0
"Inspection and Compaction Test for Backfilling (7th Layer) for Storm Water Line from MH-D-08 to MH-D-0
Excavation for Storm Water Line from MH-F-01 to MH-F-04 Including Manhole MH-F-01, MH-F-02, MH-F-
Notification to Start Grading as highlighted in the attached drawing, including Cut and Removal of Disp
"Inspection for Casting the Blinding Concrete under the Manhole (MH-D-01, MH-D-02, MH-D-03, MH-D-
Installation of straight UPVC conduit (Dia.32mm) for Power (Socket Outlet) at the Crescent-01 (Axis 01
Mock-up for North Fence Lightings Fixture selection and installation at heights 45 cm. (joint inspection of
Level, Location For BUTTRESS BII 72, 73, 74, 75, 76 ZONE 2D
Level, Location For MCPE 1 Foundation Axis 03-S to 03-R (as Highlighted)
Level, Location For BUTTRESS BII 103, 104, 105 (2nd) Zone 2L
Level, Location For BUTTRESS BII 127 (2nd) Zone 2R
Inspection and compaction test 1st layer for backfilling at Zone 1A Outer (as Highlighted)
Concreting for BUTTRESS BII 72, 73, 74, 75, 76 Zone 2D
Shuttering for BUTTRESS BII 72, 73, 74, 75, 76 Zone 2D
Concreting for MCPE 1 Foundation at Axis 03-S to 03-R (as Highlighted) ZONE 2M 2N
Shuttering for MCPE 1 Foundation at Axis 03-S to 03-R (as Highlighted) ZONE 2M 2N
Steel Reinforcement for MCPE 1 Foundation at Axis 03-S to 03-R (as Highlighted) ZONE 2M 2N
Steel Reinforcement for BUTTRESS BOI BOV, BII BIV 14, 15 Zone 1D
Steel Reinforcement, Shuttering and Concreting for Duct Bank Across Zone 2A (as Highlighted)
Concreting for BUTTRESS BII 103, 104, 105 (2nd) Zone 2L
Shuttering for BUTTRESS BII 103, 104, 105 (2nd) Zone 2L
Surface Preparation and Solvent Base Primer for PILECAPS 31, 33, 35 Zone 1F
Steel Reinforcement for Ring Beam Axis 02-1, 02AW to 02AT (as Highlighted) Zone 2P
Surface Preparation and Solvent Base Primer for Stripfooting between PC 7-9-11-13 Zone 1B
Concreting for BUTTRESS BII 127 (2nd) Zone 2R
Shuttering for BUTTRESS BII 127 (2nd) Zone 2R
Excavation and Removal of Disposal Materials upto (-20cm ) from Finishing Level near Water Garden a
Bolt Tightening Inspection of Erected Steel Structure Crescent Mock-up.
Level, Location For BUTTRESS BOI 66-67 (2nd) Zone 2B
Surface Preparation Prior to start Backfilling around Pilecap 139, 141 as highlighted Zone 2H (as highlig
Surface Preparation Prior to start Backfilling around Pilecap and Strip footing at PC 120-122-124-126 as
Concretingfor BUTTRESS BOI 66-67 (2nd) Zone 2B
Shuttering for BUTTRESS BOI 66-67 (2nd) Zone 2B
Concreting for PILECAPS 40 & 44 Zone 1G
Steel Reinforcement for Butress BII BIV 70 Zone 2C
Steel Reinforcement for Butress BOI BOV 6 Zone 1B
Installation of Rock and Boulder No. RB-298 (1st Layer)
"Inspection for Casting the Blinding Concrete under the Manhole (MH-D-06, MH-D-07, MH-D-08, MH-D
Excavation for Storm Water Line from MH-D-03 to MH-D-03-01 & MH-D-04 to MH-D-04-01 (As Highligh
Excavation for Storm Water Line from MH-D-01 to Outfall-D (As Highlighted)
Installation of straight UPVC conduit (Dia. 25mm) and Box for Voice and Data (WIFI) at the Cresent-0
Installation of straight UPVC conduit (Dia. 25mm) and Box for Fire Alarm (Speaker) at the Cresent-01
Excavation & Blinding levels for Manholes (4 no's) Inside Sound & Light garden, as per highlighted are
Plaster Guide Points & Accessories for walls at Water Feature at Grid (10-13/F-Q) at Management Buil
Coordinates & Levels of Footings of Circular Walls (6, 7, 8, 9 & 10) Half Part 2, inside Maze garden, as
Steel Reinforcement for Footing & Kicker of Circular Walls (6, 7, 8, 9 & 10) Half Part 2, inside Maze g
Installation of straight UPVC conduit (Dia. 32mm) for Power (Socket Outlet) at the Crescent - 01 (Axi
Installation of stub-up UPVC conduit (Dia. 32mm) for Power (Twin Socket) at the Maze Garden as per at
"Inspection for Backfilling (6th Layer) for Storm Water Line from MH-D-08 to MH-D-08-01 - as Highlight
"Inspection for Backfilling (6th Layer) for Storm Water Line from MH-D-08 to MH-D-09 - as Highlighted"
Installation of Rock and Boulder No. RB-329 (4th Layer)
Installation of Rock and Boulder No. RB-329 (3rd Layer)
"Inspection of Manhole Base Installation, Pipe Connection and Casting Concrete for Short Piece of Fou
Soil Preparation under Boulder No.RB- 333
Soil Preparation under Boulder No.RB- 332
Level, Location For Blinding of PILECAPS 38, 40, 42, 44 Zone 1G
Level and Location for BUTTRESS BII BIV 68, 69 (1st) Zone 2C
Level, Location For MCPE 1 axis 02-P to 03-T Zone 2M 2N
Level, Location For BUTTRESS 128 Zone 2R
Level and Location for BUTTRESS BOI BOV 124 & 125 (1ST) Zone 2Q
Concreting for MCPE 1 Axis 02-AP to 03-T Zone 2M & 2N
Shuttering for MCPE 1 Axis 02-AP to 03-T Zone 2M & 2N
Steel Reinforcement for MCPE 1 Axis 02-AP to 03-T Zone 2M & 2N
Single layer of 4mm thick modified bituminous waterproofing membrane for PILECAP 32, 34, 36 Zone 1F
Concreting for BUTTRESS BOI BOV 128 (1st) Zone 2R
Shuttering for BUTTRESS BOI BOV 128 (1st) Zone 2R
Concreting for BUTTRESS BOV 75 & 76 Zone 2D & 2E
Concreting for PILECAPS 38, 42 Zone 1G
Shuttering for PILECAPS 38, 40, 42, 44 Zone 1G
Steel Reinforcement for PILECAPS 38, 40, 42, 44 Zone 1G
Concrete pouring & Shuttering of Kicker 1st lift for Remaining Boundary wall at Discovery Garden at h
Coordinates & Levels of Kicker 1st lift for Remaining Boundary wall at Discovery Garden at highlighte
Steel Reinforcement for MCPE 2 Foundation Axis 02-AH to 02 AG as highlighted Zone 2J 2K
Inspection of Spatter Dash (Rough Coat) Prior to Internal Plastering for remaining wall Inside Locke
Paint Touch-up Inspection of Erected Steel Structure & Welded Joints Crescent Mock-up.
Installation of straight UPVC conduit (Dia. 32mm) for Power (Socket Outlet) at the Crescent -02 (Axis
Installation of straight UPVC conduit (Dia. 25mm) and Security (CAM) at the Crescent-02 (Axis 02/1J ) a
Protection layer Bitumenous Protection board for Boundary wall foundation (Outer Face) at Elevatio
Installation of straight UPVC conduit (Dia. 25mm) and Voice and Data (CAM) at the Crescent-02 (Axis 02
Installation of straight UPVC conduit (Dia. 25mm) and Box for Fire Alarm (Speaker) at the Crescent-02 (
Concrete poring & Shuttering for Kicker of Circular Walls (1, 2, 3, 4 & 5) inside Maze garden, as per h
Coordinates & Levels of Kicker of Circular Walls (1, 2, 3, 4 & 5) inside Maze garden, as per highlighted
NDT Inspection of Erected Steel Structure Crescent Mock-up.
Weld Visual Inspection of Erected Steel Structure Crescent Mock-up.
Level, Location For Blinding of Strip Footing Between PC 134, 136, 138, 140 Zone 2G Axis 02-1, 02-V, 02
Level, Location For Excavation of Strip Footing Between PC 134, 136, 138, 140 Zone 2G Axis 02-1, 02-V,
Level, Location For RC Stripfooting Zone 2A Between PC 91-93-95-97
Level, Location For BUTTRESS BOV 75 & 76 Zone 2D & 2E
Level, Location For MCPE 2 Foundation Axis 02-AH to AG as highlighted
Concreting for Strip footing RC at Zone 2A Between PC 91-93-95-97
Single Layer of 4mm thick modified bituminous waterproofing membrane under Strip footing Between P
Surface Preparation and Solent Base Primer under Strip footing Between PC 120 - 122 - 124 - 126 Zone
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-K (Seating Ar
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-G (Seating Ar
Shuttering for Strip footing RC at Zone 2A Between PC 91-93-95-97
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-K (Seating Ar
Steel Reinforcement for Strip footing RC at Zone 2A Between PC 91-93-95-97
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-L (Seating Ar
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-K (Seating Ar
Shuttering for BUTTRESS BOV 75 & 76 Zone 2D & 2E
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-K (Seating Ar
Surface Preparation and Solvent Base Primer for PILECAP 32, 34, 36 Zone 1F
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-K (Seating Ar
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-J (Seating Are
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-J (Seating Are
Concreting for MCPE 2 Foundation Axis 02-AH to 02 AG as highlighted Zone 2J 2K
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-J (Seating Are
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-J (Seating Are
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-J (Seating Are
Shuttering for MCPE 2 Foundation Axis 02-AH to 02 AG as highlighted Zone 2J 2K
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-L (Seating Ar
Concreting for Strip Footing Between PC 8-10-12-14 Zone 1B
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-N (Seating Ar
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-K (Seating Ar
Concreting for BOV 65 (2nd) Zone 2B
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-K (Seating Ar
Sealant filling for New Conctrol Joints (08 no's) on Parapet wall (Water Feature) at Grid (10-13/F-Q)
Applying Crack filler to Cracks for repair (8 No's) on Parapet wall (Water Feature) at Grid (10-13/F-Q
Concrete pouring & Shuttering for Footings of Circular Walls (6, 7, 8, 9 & 10) Half Part 1, inside Maze
Check for Executed Backfilling Under the Boundary Wall at Grid (1-19/Right side) and (1-8/Left side)
Check for Executed Backfilling Under the Boundary Wall at Grid (19-23/Right side) and (9-23/Left side
Concrete pouring & Shuttering for Footing of Remaining Boundary wall at Discovery Garden at highlig
Stone Cladding for Column's of Boundary wall @ Column No. C72 & C73 (All Sides), As per Attached H
Concrete pouring for Blinding's of Manholes (14 no's) Inside Physic garden, as per highlighted area in
Warning Tape Installation for Storm Water Line Outfall-D for (400mmØ-UPVC- Class 4) 28 m Length
300 mm Gravel 3/8" Backfilling and Geotextile for Storm Water Line Outfall-D for (400mmØ-UPVC- C
Warning Tape Installation for Storm Water Line Outfall-D for (450mmØ-UPVC- Class 4) 43 m Length
300 mm Gravel 3/8" Backfilling and Geotextile for Storm Water Line Outfall-D for (450mmØ-UPVC-
Warning Tape Installation for Storm Water Line Outfall-H for (600mmØ-PP- CORRUGATED) 54 m Leng
300 mm Gravel 3/8" Backfilling and Geotextile for Storm Water Line Outfall-H for (600mmØ-PP- CO
Concreting for Strip footing mass concrete (2nd) between PC 1 - 3 Zone 1A
Shuttering for Strip footing mass concrete (2nd) between PC 1 - 3 Zone 1A
Shear Connector for BUTTRESS BOV 66, 67 Zone 2B & 2C
Steel Reinforcement for BUTTRESS BOI BOV 69 Zone 2C
Concreting for Mass Concrete of strip footing at Zone 2N Between PC 180-182
Shuttering for Mass Concrete of strip footing at Zone 2N Between PC 180-182
Concreting for BUTTRESS BOI 64 (2nd) Zone 2B
Shuttering for BUTTRESS BOI 64 (2nd) Zone 2B
Concreting for BUTTRESS BII BIV 127 (1ST) ZONE 2R
Stone Cladding for Boundary wall (Inner Face) @ Span 10 & 14, As per Attached Highlighted Drawing'
Grouting for Stone Cladding of Boundary wall (Inner Side) Span 39 & 40 and Column's C38B, C39 & C40
Grouting for Stone Cladding of Boundary wall (Inner Side) Span 29 & 30 and Column's C28, C29 & C30 (
Openning of New Conctrol Joints (08 no's) on Parapet wall (Water Feature) at Grid (10-13/F-Q) at Ma
Openning of Cracks for repair (8 No's) on Parapet wall (Water Feature) at Grid (10-13/F-Q) at Manage
Protection Layer of 4mm thk. Bitumenous protection board for Foundation of Boundary wall (Inner Face
2nd Coat Bitumenous Damp proofing for Boundary wall foundation (Outer Face) at Elevation "A to B
1st Coat Bitumenous Damp proofing for Boundary wall foundation (Outer Face) at Elevation "A to B"
Primer Coating prior to Damp proofing for Boundary wall foundation (Outer Face) at Elevation "A to
Surface Preparation prior to Water proofing for Boundary wall foundation (Outer Face) at Elevation
Installation of Rock and Boulder No. RB-68 (Additional Quantity for Layer 3, Layer 4 and Layer 5 as p
Excavation for Storm Water Line Manhole MH-D-08, MH-D-08-01, MH-D-08-02, MH-D-07, MH-D-06,
Excavation for Storm Water Line from G-E-01 to Outfall E, including all the Line, Manhole and Gullies Hi
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-J (Seating Are
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-M (Seating A
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-N (Seating Ar
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-M (Seating A
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-M (Seating A
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-M (Seating A
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-M (Seating A
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-M (Seating Ar
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-M (Seating Ar
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-N (Seating Ar
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-N (Seating Ar
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-N (Seating Ar
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-N (Seating Ar
Shuttering for BUTTRESS BII BIV 127 (1ST) ZONE 2R
Pipe Installation of Storm Water Line Outfall-D for (315mmØ-UPVC- Class 4) 38 m Length from (MH
Bedding of Gravel 3/8" and Geotextile surrounding Storm Water Line Outfall-D for (315mmØ-UPVC-
Installation of straight UPVC conduit (Dia.32mm) for Power (Socket Outlet) at the Crescent-01 (Axis 01
Installation of stub-up UPVC conduit (Dia. 32mm) for Power (Twin Socket) at the Maze Garden as per at
Inspection of Internal Plastering for walls Inside Mechanical Maintenance Room (GF-5081) and Ware
Check for Partially Executed Backfilling along the Boundary Wall (Outer Side) of span 30, 33, 34, 35,
Check for Partially Executed Backfilling along the Boundary Wall (Inner Side) of span 3, 4, 5 & 6 at W
Check for Partially Executed Backfilling along the Boundary Wall (Inner Side) of span 22, 23, 24 & 25
Check for Partially Executed Backfilling along the Boundary Wall (Inner Side) of span 14, 15, 16, 17,
Soil Preparation under Boulder No.RB- 330 after cutting.
Soil Preparation under Boulder No.RB- 331 after cutting.
"Inspection for Casting the Blinding Concrete under the Manhole for FW-A-3-6.1, FW-A-3-6.2, FW-A-3-6.
Excavation for Foul Water Line from FW-A-3-6 to FW-A-3-6.1 including the Manhole FW-A-3-6 & FW-A-3-6
Soil Preparation under Boulder No.RB- 334 prior to start backfilling
Soil Preparation under Boulder No.RB- 330 prior to start cutting.
Soil Preparation under Boulder No.RB- 331 prior to start cutting.
Pipe Installation of Storm Water Line Outfall-H for (600mmØ-PP- CORRUGATED) 54 m Length from (M
Bedding of Gravel 3/8" and Geotextile surrounding Storm Water Line Outfall-H for (600mmØ-PP- C
Pipe Installation of Foul Water Line (315mmØ-UPVC- Class 4) 50m Length from (FW-A-3-6.1 to FW-A-3
Bedding of Gravel 3/8" and Geotextile surrounding Foul Water Line (315mmØ-UPVC- Class 4) 50m Len
Warning Tape Installation for Storm Water Line Outfall-D for (450mmØ-UPVC- Class 4) 95 m Length
300 mm Gravel 3/8" Backfilling and Geotextile for Storm Water Line Outfall-D for (450mmØ-UPVC- C
Pipe Installation of Storm Water Line Outfall-D for (400mmØ-UPVC- Class 4) 28 m Length from (MH-
Bedding of Gravel 3/8" and Geotextile surrounding Storm Water Line Outfall-D for (400mmØ-UPVC-
Pipe Installation of Storm Water Line Outfall-D for (450mmØ-UPVC- Class 4) 43 m Length from (MH
Bedding of Gravel 3/8" and Geotextile surrounding Storm Water Line Outfall-D for (450mmØ-UPVC-
Concreting for BUTTRESS BIV 103 (2nd) Zone 2L
Shuttering for BUTTRESS BIV 103 (2nd) Zone 2L
Concreting for BUTTRESS BIV 127 (2nd) Zone 2R
Shuttering for BUTTRESS BIV 127 (2nd) Zone 2R
Concreting for BUTTRESS BOI 103, 104, 105 Zone 2L
Shuttering for BUTTRESS BOI 103, 104, 105 Zone 2L
Concreting for BUTTRESS BOI 72, 73, 74 Zone 2D
Bolt Tightening Inspection of erected steel structure Crescent Mock up
Level, Location For BUTTRESS BIV 103 (2nd) Zone 2L
Level, Location For BUTTRESS BIV 127 (2nd) Zone 2R
Surface Preparation Prior to start Backfilling around Pilecap 187 as highlighted Zone 2Q (as highlighted)
Check the Executed Backfilling for the highlighted area as per the attached RFT's, RFI's at Zone 1P (TIP)
Installation of stub-up UPVC conduit (Dia. 32mm) for Security (CAM) at the Discovery Garden as per att
Installation of stub-up UPVC conduit (Dia. 32mm) for Voice and Data (FO/Copper Converter, E-Ticket,C
Installation of stub-up UPVC conduit (Dia. 32mm) for Fire Alarm (Interface Unit) at the Discovery Garde
Installation of stub-up UPVC conduit (Dia. 32mm) for Power (FO Converter & E-Ticket Machine) at the
Installation of earthing clamps with conductor 70mm for earthing reinforcement steel re-bar at the Di
Excavation and Removal of Disposal Materials ( -75cm ) from Parking Area at Zone-G as per the attach
Excavation for Storm Water Line from MH-D-01 to MH-D-01-A2 & MH-D-01-A1 to MH-D-01-A1-01 & MH-
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-J (Seating Are
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-J (Seating Are
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-J (Seating Are
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-M (Seating A
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-I (Seating Are
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-J (Seating Are
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-M (Seating A
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-M (Seating Ar
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-M (Seating Ar
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-N (Seating Ar
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-N (Seating Ar
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-N (Seating Ar
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-N (Seating Ar
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-N (Seating Ar
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-N (Seating Ar
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-N (Seating Ar
Installation of Rock and Boulder No. RB-329 (2nd Layer)
Steel Reinforcement for Columns & Wall of Outer Canopy 3 at Physic Garden, as per highlighted area
Coordinates & Levels of Footing for Remaining Boundary wall at Discovery Garden at highlighted area
Steel Reinforcement for Footing & Kicker of Remaining Boundary wall at Discovery Garden at highligh
Steel Reinforcement for Footing & Kicker of Circular Walls (6, 7, 8, 9 & 10) Half Part 1, inside Maze g
Coordinates & Levels of Footings of Circular Walls (6, 7, 8, 9 & 10) Half Part 1, inside Maze garden, as
Existing levels prior to Backfilling Sub-Grade at Highlighted area along with seat walls @ Sound & Lig
Excavation & Surface preparation prior to cast Blinding for Boundary wall @ Elevation (A, G & H) at
Check for Executed Backfilling for Under the foundation of Whispering Cave 1, at Sound & Light Garde
Check for Executed Backfilling for Under the Boundary Wall (C, D, E, F & I) at Sound & Light Garden,
Check for Executed Backfilling for Subsurface Drain pipe crossing the Boundary Wall (D) at Sound & L
Installation and Erection of Steel Structure for Crescent (Mock-up).
Level, Location and Alignment for Steel Structure (Crescent Mock-up).
Level, Location For BUTTRESS BOI 65 (1st) Zone 2B
Level and Location for PILECAPS 31, 33, 35 zone 1F
Level and Location for BUTTRESS BIV 72, 73, 74, 75, 76 zone 2D
Concreting for BUTTRESS BII BIV 68, 69 Zone 2C
Shear Connector for BUTTRESS BII BIV 68, 69 Zone 2C
Shuttering for BUTTRESS BII BIV 68, 69 Zone 2C
Concreting for BUTTRESS BOI 65 (1st) Zone 2B
Shuttering for BUTTRESS BOI 65 (1st) Zone 2B
Concreting for PILECAPS 31, 33, 35 Zone 1F
SHuttering for PILECAPS 31, 33, 35 Zone 1F
Inspection of Internal Plastering for walls Inside "Electrical Maintenance Room" (GF-5082) @ Grid (4
Steel Reinforcement for PILECAPS 31, 33, 35 Zone 1F
Concreting for BUTTRESS BIV 72, 73, 74, 75, 76 Zone 2D
Check for Completion of Backfilling of Sub-base Under the Stack Boulders 1st lines of Geyser Garden
Check for Completion of Backfilling of Sub-base Under the Planted Bed 2 & 3, inside Water play Garde
Check for Completion of Backfilling of Sub-base Under the Planted Bed 1, inside Water play Garden, a
Check for Completion of Backfilling of Sub-base Under the Planted Bed inside Boat Garden at Water G
Shuttering for BUTTRESS BIV 72, 73, 74, 75, 76 Zone 2D
Check for Completion of Backfilling of Sub-base Under the Boulders (1, 2 & 3 lines) Beside Planted B
Check for Completion of Backfilling Under the Blinding of Water Fountain of Geyser Garden inside Wa
Check for Completion of Backfilling along the Boundary wall Bothside at grid EXC4-29/30 to 41/42 and
Check for Completion of Backfilling Under the Blinding of Outer Canopy 1, 2 & 3 at Physic Garden, at
Check for Completion of Backfilling Under the Boundary Wall of span 17 & 18 at Water Garden, at hig
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-J (Seating Are
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-J (Seating Are
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-K (Seating Ar
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-K (Seating Ar
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-K (Seating Ar
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-K (Seating Ar
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-K (Seating Ar
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-K (Seating Ar
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-G (Seating Ar
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-K (Seating Ar
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-K (Seating Ar
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-K (Seating Ar
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-K (Seating Ar
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-K (Seating Ar
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-G (Seating Ar
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-G (Seating Ar
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-G (Seating Ar
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-G (Seating Ar
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-G (Seating Ar
Check the Executed Backfilling for the Highlighted area as per the attached RFT's at Zone-G (Seating Ar
Excavation for Foul Water Line from FW-A-3-6.1 to FW-A-3-6.4 including the Manhole FW-A-3-6.1, FW-A-
Check the Completion of Backfilling for the Highlighted area as per the attached RFT's at Zone-M (Near
Installation of Rock and Boulder No. RB-329 (1st Layer)
'300 mm GRAVEL Backfilling above Storm Water Line- Outfall B for (450mmØ-UPVC- Class 4) 29m Leng
'Warning Tape Installation for Storm Water Line- Outfall B for (450mmØ-UPVC- Class 4) 32m Length f
300 mm Gravel 3/8" Backfilling and Geotextile for STORM WATER Line-OutFall-B for (450mmØ-UPVC- Cl
Warning Tape Installation for Storm Water Line- Outfall B for (315mmØ- UPVC- CLASS 4) from (MH-
300 mm Gravel 3/8" Backfilling and Geotextile for Storm Water Line- Outfall B for (315mmØ- UPVC-
Warning Tape Installation for Storm Water Line- Outfall B for (400mmØ- UPVC- CLASS 4) from (MH-
300 mm Gravel 3/8" Backfilling and Geotextile for Storm Water Line- Outfall B for (400mmØ- UPVC
Warning Tape Installation for Storm Water Line- Outfall B for (400mmØ- UPVC- CLASS 4) from (MH-
300 mm Gravel 3/8" Backfilling and Geotextile for Storm Water Line- Outfall B for (400mmØ- UPVC
Warning Tape Installation for Storm Water Line Outfall-H for (450mmØ-UPVC- Class 4) 54 m Length
300 mm Gravel 3/8" Backfilling and Geotextile for Storm Water Line Outfall-H for (450mmØ-UPVC- C
Warning Tape Installation for Storm Water Line Outfall-D for (315mmØ-UPVC- Class 4) 41m Length
300 mm Gravel 3/8" Backfilling and Geotextile for Storm Water Line Outfall-D for (315mmØ-UPVC-
Warning Tape Installation for Storm Water Line Outfall-D for (400mmØ-UPVC- Class 4) 25 m Length
300 mm Gravel 3/8" Backfilling and Geotextile for Storm Water Line Outfall-D for (400mmØ-UPVC- C
Installation of Box and UPVC straight conduit (Dia.25mm) for Power (13A Cleaner Socket,Wall Moun
Check the Completion of Backfilling for the Highlighted area as per the attached RFT's at Zone-K&L (Se
Level and Location for MCPE 1 Foundation (axis 03-T to 03-S) as highlighted
Protection layer of geotextile sheet and 30 mm screed protection under Strip footing Between PC 16
Single layer of 4mm thick modified bituminous waterproofing mambrane under Strip footing Between
Protection layer of geotextile sheet and 30mm screed protection under Strip footing Between PC 174-
Single layer of 4mm thick modified bituminous water proofing membrane under Strip footing Between
Concreting for MCPE 1 Foundation (axis 03-T to 03-S) as highlighted
Shuttering for MCPE 1 Foundation (axis 03-T to 03-S) as highlighted
Steel Reinforcement for MCPE 1 Foundation (axis 03-T to 03-S) as highlighted
Check for Completion of Backfilling under the Column's along the Abutement Wall of Jetty 2, at Boat
Check for Completion of Backfilling under the Column's along the Abutement Wall of Jetty 1, at Boat
Check for Completion of Backfilling under the Boundary Wall of span 36, 37 & 39 at Water Garden, at
Check for Completion of Backfilling under the Boundary Wall of span 33, 34 & 35 at Water Garden, at
Check for Completion of Backfilling under the Boundary Wall of span 30 & 32 at Water Garden, at hig
Stone Cladding for Boundary wall (Outer Face) @ Span 49 of Water Garden, at Highlighted area in At
Stone Cladding for Boundary wall (Outer Face) @ Span 48 of Water Garden, at Highlighted area in At
Stone Cladding for Boundary wall (Outer Face) @ Span 40 of Water Garden, at Highlighted area in At
Stone Cladding for Boundary wall (Inner Face) @ Span 4 of Water Garden, at Highlighted area in Att
Stone Cladding for Boundary wall (Inner Face) @ Span 3 of Water Garden, at Highlighted area in Att
Stone Cladding for Boundary wall (Inner Face) @ Span 1 of Water Garden, at Highlighted area in Att
Check for Completion of Backfilling under the Boundary Wall of span 26, 27, 28 & 29 at Water Garden,
Check for Completion of Backfilling under the Boundary Wall of span 5, 6 & 7 at Water Garden, at hig
Check for Completion of Backfilling under the Boundary Wall of span 1, 2, 3 & 4 at Water Garden, at
Single Layer Water proofing membrane 4mm thk. for Foundation of Boundary wall (Inner Face) at Grid (
Protection layer 4mm thk Bituminous protection board for Light walls (C, D, E, F, G & H) foundations
Excavation & Surface Preparation for foundation of boundary wall @ span 8 & 9 @ Water Garden at h
Levels after Cutting for Foundation of Boundary Wall at Span 8, 9, 10 & 11 @ Water Garden at highlig
Installation of Rock and Boulder No. RB-308 (3rd Layer)
Installation of Rock and Boulder No. RB-307 (3rd Layer)
Installation of Rock and Boulder No. RB-308 (2nd Layer)
Check the Completion of Backfilling for the Highlighted area as per the attached RFT's at Zone-J (Seatin
Check the Completion of Backfilling for the Highlighted area as per the attached RFT's at Zone-N (Seati
Check the Completion of Backfilling for the Highlighted area as per the attached RFT's at Zone-G (Praye
Check the Completion of Backfilling for the Highlighted area as per the attached RFT's at Zone-B (Area -
Check the Completion of Backfilling for the Highlighted area as per the attached RFT's at Zone-L (Area -
Excavation for Storm Water Line from MH-D-01 to MH-D-01-B1 Including Manhole MH-D-01 and MH-D-0
INSPECTION FOR MANHOLE BASE INSTALLATION, UPVC PIPE CONNECTION AND CASTING CONCRETE FOR SHO
Check the Completion of Backfilling for the Highlighted area as per the attached RFT's at Zone-L (Area -
Check the Completion of Backfilling for the Highlighted area as per the attached RFT's at Zone-L (Near
Check the Completion of Backfilling for the Highlighted area as per the attached RFT's at Zone-K (Seati
Check the Completion of Backfilling for the Highlighted area as per the attached RFT's at Zone-K (Seati
Installation of straight UPVC conduit (Dia. 25mm) and Box for Security (CAM ) at the Crescent-02 (Axis
Installation of straight UPVC conduit (Dia. 25mm) and Box for Voice and Data (WIFI&CAM) at the Cresce
Installation of straight UPVC conduit (Dia. 25mm) and Box for Fire Alarm (Speaker) at the Crescent-02 (
Installation of straight UPVC conduit (Dia.32mm) for Power (Socket Outlet) at the Crescent-02 (Axis 02
Inspection for Completion of Backfilling along the Boundary Wall (Inner Sides) of span 37, 38 & 39 at
Inspection for Completion of Backfilling along the Boundary Wall (Outer Sides) of span 29 at Water Ga
Inspection for Completion of Backfilling along the Boundary Wall (Outer Sides) of span 26, 27 & 28 at
Inspection for Completion of Backfilling along the Boundary Wall (Outer Sides) of span 19, 20, 21, 22,
Inspection for Completion of Backfilling along the Boundary Wall (Outer Sides) of span 7, 8, 9, 10 & 1
Inspection for Completion of Backfilling along the Boundary Wall (Outer Sides) of span 3, 4, 5 & 6 at
Check the Completion of Backfilling for the Highlighted area as per the attached RFT's at Zone-K (Seati
Check the Completion of Backfilling for the Highlighted area as per the attached RFT's at Zone-G (Seati
Check the Completion of Backfilling for the Highlighted area as per the attached RFT's at Zone-G (Seati
Check the Completion of Backfilling for the Highlighted area as per the attached RFT's at Zone-G (Seati
Check the Completion of Backfilling for the Highlighted area as per the attached RFT's at Zone-G (Seati
Check the Completion of Backfilling for the Highlighted area as per the attached RFT's at Zone-J (Seatin
Check the Completion of Backfilling for the Highlighted area as per the attached RFT's at Zone-J (Seatin
Check the Completion of Backfilling for the Highlighted area as per the attached RFT's at Zone-J (Seatin
Concrete Surface Preperation prior to start the Waterproofing for Seating Area (1) at Zone-K (SA-16) As
Concrete Surface Preperation prior to start the Waterproofing for Seating Area (3) at Zone-K (SA-26) As
Check the Completion of Backfilling for the Highlighted area as per the attached RFT's at Zone-N (Seati
Check the Completion of Backfilling for the Highlighted area as per the attached RFT's at Zone-M (Seat
Check the Completion of Backfilling for the Highlighted area as per the attached RFT's at Zone-N (Seati
Check the Completion of Backfilling for the Highlighted area as per the attached RFT's at Zone-N (Seati
Check the Completion of Backfilling for the Highlighted area as per the attached RFT's at Zone-B (Plaza
Check the Completion of Backfilling for the Highlighted area as per the attached RFT's at Zone-M (Road
Installation of Rock and Boulder No. RB-307a (3rd Layer)
Excavation and Surface Preperation prior to start backfilling under Footing of Seating Area (1) Zone-N (S
Pipe Installation of Storm Water Line Outfall-H for (450mmØ-UPVC- Class 4) 54 m Length from (MH-
Bedding of Gravel 3/8" and Geotextile surrounding Storm Water Line Outfall-H for (450mmØ-UPVC- C
Level and Location for As Built - Around PC 175 Zone 2N (reference for backfilling) as highlighted
Level and Location for As Built - TIP Zone 1A (External) (reference for backfilling) as highlighted
Level and Location for PILECAP 32, 34, 36 Zone 1F
Level and Location for Buttress BIV 104 (2nd) Zone 2L
Surface Preparation Prior to start Backfilling around Pilecap 175 as highlighted Zone 2N (as highlighted)
Surface Preparation and Solvent base Primer under Strip footing Between PC 166-168-170-172-174 Zo
Surface Preparation and Solvent base Primer under Strip footing Between PC 174-176-178-180 Zone 2N
Concreting for PILECAPS 32, 34, 36 Zone 1F
Shuttering for PILECAPS 32, 34, 36 Zone 1F
Steel Reinforcement for PILECAPS 32, 34, 36 Zone 1F
Steel Reinforcement for BUTTRESS BII BIV 70 & 71 Zone 2C
Protection layer of 4mm thick bituminous protection board for Pilecap 156, 158 Zone 2K
Single layer of 4mm thick modified bituminous waterproofing membrane for Pilecap 156, 158 Zone 2K
Protection layer of 4mm thick bituminous protection board for Pilecap 145, 146, 147, 148, 149, 150, 15
Single layer of 4mm thick modified bituminous waterproofing membrane for Pilecap 145, 146, 147, 148,
Concreting for Tunnel 2 Wall (2nd) zone 2F
Surface Preparation and Solvent base Primer under Strip footing between PC 1-3-5 Zone 1A
25mm thick epoxy grout (master seal 915) under Pilecap 47, 48, 49, 50, 51, 52, 53, 54, 55, 56, 57, 58, 59,
Geotextile sheet and 30mm screed protection under Pilecap 47, 48, 49, 50, 51, 52, 53, 54, 55, 56, 57, 58,
Concrete for BUTTRESS BIV 104 (2nd) Zone 2L
Shuttering for BUTTRESS BIV 104 (2nd) Zone 2L
Pipe Installation of Storm Water Line Outfall-D for (450mmØ-UPVC- Class 4) 95 m Length from (MH-
"INSPECTION OF SURFACE PREPERATION FOR CONCRETE ENCASEMENT OF (G-X-5) PRIOR TO START WATE
Excavation for Storm Water Line from MH-D-05 to MH-D-06 (As Highlighted)
Excavation for Storm Water Line from MH-D-01 to MH-D-01-A1 (As Highlighted)
"Inspection of Manhole Base Installation, Pipe Connection and Casting Concrete for Short Piece of Fo
Inspection of Concrete Pouring for the Wall of Seating Area (2) at Zone-K (SA-42) As Highlighted
"Inspection of Formwork for the Wall of Seating Area (2) at Zone-K (SA-42) As Highlighted"
Inspection for Casting the Blinding Concrete under Foundation of Seating Area (3) at Zone-K (SA-34) As
Inspection for Filling Floor Joints (Horizontal) and Final Completion of Rock and Boulder No. RB-112
Inspection for Filling Floor Joints (Horizontal) and Final Completion of Rock and Boulder No. RB-295
Installation of Rock and Boulder No. RB-307 (2nd Layer)
Check the Completion of Backfilling for the Highlighted area as per the attached RFT's at Zone-C (Beh
Check the Completion of Backfilling for the Highlighted area as per the attached RFT's at Zone-C (Beh
Excavation for Storm Water Line from MH-D-01 to MH-D-02 (As Highlighted)
Concrete pouring & Shuttering for Footings of Circular Walls (1, 2, 3, 4 & 5) inside Maze garden, as pe
Inspection for Completion of Backfilling along the Boundary Wall (Outer Sides) of span 14, 15 & 16 at
Concretes pouring & Shuttering of Kicker (2nd lift) for Outer Canopy 1 & 2 at Physic Garden, as per h
Coordinates & Levels of Kicker (2nd Lift) for Outer Canopy 1 & 2 at Physic Garden, as per highlighted
Pipe Installation of Storm Water Line Outfall-D for (400mmØ-UPVC- Class 4) 25 m Length from (MH-
Bedding of Gravel 3/8" and Geotextile surrounding Storm Water Line Outfall-D for (400mmØ-UPVC- C
Bedding of Gravel 3/8" and Geotextile surrounding Storm Water Line Outfall-D for (450mmØ-UPVC- C
Pipe Installation of Storm Water Line Outfall-D for (315mmØ-UPVC- Class 4) 41m Length from (MH-D
Bedding of Gravel 3/8" and Geotextile surrounding Storm Water Line Outfall-D for (315mmØ-UPVC-
Warning Tape Installation for Storm Water Line Outfall-D for (400mmØ-UPVC- Class 4) 84m Length
300 mm Gravel 3/8" Backfilling and Geotextile for Storm Water Line Outfall-D for (400mmØ-UPVC-
Warning Tape Installation for Storm Water Line Outfall-D for (160mmØ-UPVC- Class 4) 30m Length
300 mm Gravel 3/8" Backfilling and Geotextile for Storm Water Line Outfall-D for (160mmØ-UPVC-
Concreting for BUTTRESS BII 126 (2nd) Zone 2R
Shuttering for BUTTRESS BII 126 (2nd) Zone 2R
Level and Location for Buttress BII 126 (2nd) Zone 2R
Level and Location for MCPE 2 Foundation (axis 02-AE to 02-AD) (as highlighted)
Level and Location for Buttress BIV 128 Zone 2R
Concreting for MCPE 2 Foundation (axis 02-AE to 02-AD) (as Highlighted)
Shuttering for MCPE 2 Foundation (axis 02-AE to 02-AD) (as Highlighted)
Steel Reinforcement for MCPE 2 Foundation (axis 02-AE to 02-AD) (as Highlighted)
Concreting for BUTTRESS BIV 128 Zone 2R
Shuttering for BUTTRESS BIV 128 Zone 2R
Protection layer of 4mm thick bituminous protection board for Foundation of Strip Footing Zone 2Q (
Level and Location for Buttress BOI 103 Zone 2L
Level and Location for Buttress BIV 105 (2nd) Zone 2L
Level and Location for Buttress BIV BII 103 (1st) Zone 2L
Level and Location for RC Strip Footing Between PC 94-96-98 Zone 2A (as highlighted)
Level and Location for Strip Footing Mass Concrete Between PC 120-122-124-126 Zone 2E (as highlighte
Surface preparation and solvent base primer for PILECAP 156, 158 Zone 2K
Surface preparation and solvent base primer for PILECAP 145, 147, 149, 151 Zone 2J
Concreting for Buttress BII BIV 104 (1st) As highlighted Zone 2L
Steel Reinforcement for Buttress BII BIV 53 Zone 1N
Concreting for BIV 105 (2nd) (as highlighted) zone 2L
Shuttering for BIV 105 (2nd) (as highlighted) zone 2L
Concreting for BII BIV 103 (1st) (as highlighted) zone 2L
Shuttering for BII BIV 103 (1st) (as highlighted) zone 2L
Concreting for strip footing between PC 94-96-98 zone 2A
Shuttering for strip footing between PC 94-96-98 zone 2A
Steel Reinforcement for strip footing between PC 94-96-98 zone 2A
Concreting for mass concrete for strip footing between PC 120-122-124-126 zone 2E
Formworks for mass concrete for strip footing between PC 120-122-124-126 zone 2E
Anti termite under mass concrete for strip footing between PC 120-122-124-126 zone 2E
Steel Reinforcement for Column's (22 no's) at Back of House inside Aviary garden, At Highlighted in t
Concrete pouring & Shuttering for Column's (22 no's) (upto level +883.200) at Back of House inside Av
Coordinates & Levels for Column's (22 no's) (upto level +883.200) at Back of House inside Aviary gard
Concrete pouring for Blinding of Remaining Boundary wall and Plant Room at Discovery Garden at hig
Coordinates & Levels of Blinding for Remaining Boundary wall and Plant Room at Discovery Garden at
Excavation & Soil preparation for Remaining Boundary wall at Discovery Garden at highlighted area i
Aluminium flashing & Sealant for water proofing of Light wall (A & B) foundations (All Sides) @ Soun
Aluminium flashing & Sealant for water proofing of Boundary wall foundation (Inner Face) at Elevat
Aluminium flashing & Sealant for water proofing of Boundary wall foundation (Inner Face) at Elevat
Concrete pouring for Blinding under Manholes (Type 'A' 1 no's) Inside Maze garden, as per highlighte
Installation of stub-up UPVC conduit (Dia. 25mm) for Voice and Data (WIFI) at the Maze Garden as per
Steel Reinforcement for BUTTRESS BOI BOV 6, 7 Zone 1B
Check the Completion of Backfilling for the Highlighted area as per the attached RFT's at Zone-E (Beh
Check the Completion of Backfilling for the Highlighted area as per the attached RFT's at Zone-D (Be
Check the Completion of Backfilling for the Highlighted area as per the attached RFT's at Zone-C (Beh
Check the Completion of Backfilling for the Highlighted area as per the attached RFT's at Zone-C&D (
Check the Completion of Backfilling for the Highlighted area as per the attached RFT's at Zone-B&C (
Check the Completion of Backfilling for the Highlighted area as per the attached RFT's at Zone-C (Beh
"Inspection of Manhole Base Installation, Pipe Connection and Casting Concrete for Short Piece of Fou
Installation of Rock and Boulder No. RB-149 (4th Layer)
Notification to Start backfilling and Installation of Stone Cladding for Prayer Area at Zone- K (As Highligh
Excavation & Blinding levels for Manholes (14 no's) Inside Maze garden, as per highlighted area in at
Level and Location for PILECAPS 83, 85, 87 Zone 1P (as highlighted)
Concreting for Pilecaps 83, 85, 87 Zone 1P
Shuttering for Pilecaps 83, 85, 87 Zone 1P
Inspection of Spatter Dash (Rough Coat) prior to Internal Plastering for walls Inside Ware House (GF
Steel Reinforcment for Pilecaps 83, 85, 87 Zone 1P
Inspection of Spatter Dash (Rough Coat) prior to External Plastering at Elevation of Grid (2/K1-R) at
Coordinates & Levels of Footings of Circular Walls (1, 2, 3, 4 & 5) inside Maze garden, as per highligh
Steel Reinforcement for Footing & Kicker of Circular Walls (1, 2, 3, 4 & 5) inside Maze garden, as per
Inspection for Backfilling Sub-base under Boulder no. RB-149
Inspection for Backfilling Sub-base under Boulder no. RB-298
Soil Preparation under Boulder No.RB- 298 prior to start Sub-base
Check the Completion of Backfilling for the Highlighted area as per the attached RFT's at Zone-D (SBC-0
Check the Completion of Backfilling for the Highlighted area as per the attached RFT's at Zone-D (SBC-0
Check the Completion of Backfilling for the Highlighted area as per the attached RFT's at Zone-E (Area-1
Check the Completion of Backfilling for the Highlighted area as per the attached RFT's at Zone-D (SBC-0
Check the Completion of Backfilling for the Highlighted area as per the attached RFT's at Zone-D (No
Installation of Rock and Boulder No. RB-149 (3rd Layer)
Level and Location for wall at tunnel 2 (2nd) zone 2F (as highlighted)
Level and Location for Blinding of Strip Footing (2ND) Between PC 1-3 as highlighetd Zone 1A
Shuttering for Tunnel 2 Wall (2nd) Zone 2F (as highlighted)
Concreting for Strip footing mass concrete (2nd) between PC 1 - 3 Zone 1A
Shuttering for Strip footing mass concrete (2nd) between PC 1 - 3 Zone 1A
Warning Tape Installation for Storm Water Line for (315mmØ-UPVC- CLASS 4) 17 m Length. INSIDE
Warning Tape Installation for Foul Water Line for (110mmØ-UPVC- CLASS 4) 28 m Length. INSIDE M
Warning Tape Installation for Foul Water Line (315mmØ-UPVC- Class 4) 48m Length from (FW-A-3-6.4
300 mm Gravel 3/8" Backfilling and Geotextile for Foul Water Line (315mmØ-UPVC- Class 4) 48m Len
Pipe Installation of Storm Water Line Outfall-D for (160mmØ-UPVC- Class 4) 30m Length from (MH-
Pipe Installation of Storm Water Line Outfall-D for (400mmØ-UPVC- Class 4) 84m Length from (MH-
Warning Tape Installation for Storm Water Line Outfall-D for (160mmØ-UPVC- Class 4) 50m Length
300 mm Gravel 3/8" Backfilling and Geotextile for Storm Water Line Outfall-D for (160mmØ-UPVC-
Warning Tape Installation for Storm Water Line - Out Fall A for (Ø 315mm-UPVC- Class 4 ) 21 m
300 mm Gravel 3/8" Backfilling and Geotextile for Storm Water Line - Out Fall A for (Ø 315mm -
Pipe Installation of Storm Water Line for (315mmØ-UPVC- CLASS 4) 17 m Length ( with conrete inc
Pipe Installation of Foul Water Line for (110mmØ-UPVC- CLASS 4) 28 m Length ( with concrete inca
Level and Location for As Built - PILECAPS 117, 119, 120, 122, 124, 126 Zone 2E (reference for backfillin
Concreting for PILCAPS 145, 147, 149 Zone 2J & 2H
Shuttering for PILCAPS 145, 147, 149 Zone 2J & 2H
Steel Reinforcement for PILCAPS 145, 147, 149 Zone 2J & 2H
Shear Connector for Buttress BOI-BOV 64 zone 2B
Steel Reinforcement for BUTTRESS BOI BOV 99 Zone 2K
Surface Preparation amd Solvent Base Primer for Pilecaps 146, 148, 150, 152 Zone 2J
Steel Reinforcement for BUTTRESS BII BIV 6 & 7 Zone 1B
Protection layer of geotextile and 50mm thk screed under foundation of MCPE 1 Zone 2M 2N
Bedding of Gravel 3/8" and Geotextile surrounding Storm Water Line Outfall-D for (400mmØ-UPVC-
Bedding of Gravel 3/8" and Geotextile surrounding Storm Water Line Outfall-D for (160mmØ-UPVC-
Excavation & Bed preparation for Sub Surface Branch Drain Pipe (Branch pipes 110mm 10no's) along Li
Slated layer 4mm thk Modified Bituminous water proofing membrane for Light wall (A & B) foundation
Protection layer 4mm thk Bituminous protection board for Light wall (A & B) foundations (All Sides)
Stone Cladding for Boundary wall (Inner Face) @ Span 9 of Water Garden, at Highlighted area in Att
Stone Cladding for Boundary wall (Inner Face) @ Span 8 of Water Garden, at Highlighted area in Att
Excavation for Storm Water Line from MH-D-02 to MH-D-04 (As Highlighted)
"Inspection of Manhole Base Installation, Pipe Connection and Casting Concrete for Short Piece of Fo
Inspection of Gully Installation, Pipe Connection and Casting Concrete for Short Piece for Gully - G-X-5 (
Installation of Rock and Boulder No. RB-308 (1st Layer)
Installation of straight UPVC conduit (Dia.32mm) for Power (Socket Outlet) at the Crescent-02 (Axis 02
Installation of straight UPVC conduit (Dia. 25mm) and Box for Voice and Dta (WIFI) at the Crescent-02 (
Installation of straight UPVC conduit (Dia. 25mm) and Box for Fire Alarm (Speaker) at the Crescent-02 (
Installation of straight UPVC conduit (Dia. 25mm) and Box for Fire Alarm (Speaker) at the Crescent-02 (
Installation of straight UPVC conduit (Dia. 25mm) and Box for Security (CAM) at the Crescent-01 (Axis
Installation of straight UPVC conduit (Dia. 25mm) and Box for Voice and Data (WIFI & CAM) at the Cres
Installation of straight UPVC conduit (Dia. 25mm) and Box for Fire Alarm (Speaker) at the Crescent-01 (
Installation of straight UPVC conduit (Dia.32mm) for Power (Socket Outlet) at the Crescent-02 (Axis 02
Installation of straight UPVC conduit (Dia.32mm Socket Outlet) for Power at the Crescent-01 (Axis 01/
Steel Reinforcement for BUTTRESS BOI BOV & BII BIV 75-76 Zone 2D & 2E
Shuttering for BUTTRESS BIV 126 (2nd) Zone 2R
Concreting for BUTTRESS BIV 126 (2nd) Zone 2R
Surface Preparation Prior to start Backfilling around Pilecap 117, 119, 120, 122, 124, 126 as highlighted
Level and Location for BUTTRESS BOV 65 (2nd) Zone 2B
Concreting for BOV 65 (2nd) Zone 2B
Shear Connector for BOV 65 (2nd) Zone 2B
Shuttering for BOV 65 (2nd) Zone 2B
Shear Connector impalt installation for BII BIV 67 (1st) Zone 2C
Single layer of 4mm thick modified bituminous waterproofing membrane for Pilecaps 139, 140, 141, 1
Protection layer of 4mm thick bituminous protection board for Pilecaps 91 & 92 Zone 2A
Soil Preparation under Boulder No.RB- 308 after cutting.
Inspection for Filling Floor Joints (Horizontal) and Final Completion of Rock and Boulder No. RB-288
Installation of Rock and Boulder No. RB-149 (2nd Layer)
Single layer of 4mm thick modified bituminous waterproofing membrane for Pilecaps 91 & 92 Zone 2A
Installation of Rock and Boulder No. RB-149 (1st Layer)
Protection layer of 4mm thick bituminous protection board for Strip footing between PC 104-106-108
Soil Preparation under Boulder No. RB- 109
Protection layer of 4mm thick bituminous protection board for Strip footing between PC 109-111-113 Z
Protection layer of 4mm thick bituminous protection board for Pilecaps 7, 8, 11 Zone 1B
Excavation for Storm Water Line from G-H-3 to Outfall H, including Manhole and Gullies Highlighted in
Inspection for Gullies Installation and Pipe Connection for - G-X-5 , G-A-1, G-A-5 (As Highlighted)
Inspection of Plaster Guide Points and Plaster Accessories prior to start Spatter Dash (Rough Coat) f
Inspection of Plaster Guide Points and Plaster Accessories prior to start Spatter Dash (Rough Coat) fo
Inspection of Internal Plastering for walls Inside Vehicle Maintenance Room (GF-5084) & Metal Work
Concrete Pouring for Blinding under Foundation of Circular Walls (6, 7, 8, 9 & 10) inside Maze garden,
Concrete pouring & Shuttering for Kicker (2nd Lift) of Outer Canopy 3 at Physic Garden, as per highli
Coordinates & Levels of Kicker (2nd Lift) for Outer Canopy 3 at Physic Garden, as per highlighted area
Single layer of 4mm thick modified bituminous water proofing membrane for Pilecaps 7, 8,11 Zone 1B
Protection layer of 4mm thick bituminous protection board for Pilecaps 1, 2, 3 Zone 1A
Single layer of 4mm thick modified bituminous water proofing membrane for Pilecaps 1, 2, 3 Zone 1A
Steel Reinforcement for BUTTRESS BOV BOI 100, 101, 102 & BII BIV 99 Zone 2K 2L
Installation of UPVC straight conduit (Dia.110mm sleeve) for Low Current Cables (Data,FA,ICT & Secu
Installation of straight UPVC conduit (Dia. 25mm) and Box for Security (CCTV) at the Crescent-01 (Axis
Installation of straight UPVC conduit (Dia. 25mm) and Box for Voice and Data (WIFI&CAM) at the Cresce
Installation of straight UPVC conduit (Dia. 25mm) and Box for Fire Alarm (Speaker) at the Crescent-01 (
Surface Preparation Prior to start Backfilling around Pilecap 135, 137 as highlighted Zone 2G (as highlig
Surface Preparation Prior to start Backfilling South tower bridge foundation as highlighted Zone 2A (as h
Installation of straight UPVC conduit (Dia.32mm Socket Outlet) for Power at the Crescent-01 (Axis 01/
Level and Location for BUTTRESS BIV 126 (2nd) Zone 2R
Level and Location for As Built - PILECAPS 135, 137 Zone 2G (reference for backfilling)
Coordinates & Level of Blinding under Foundation of Circular Walls (6, 7, 8, 9 & 10) inside Maze garde
Level and Location for As Built - South Bridge foundation Zone 2A (reference for backfilling)
Excavation & Surface Preparation for Foundation of Circular Walls (6, 7, 8, 9 & 10) inside Maze garden
Concretes pouring & Shuttering of Kicker (1st lift) for Outer Canopy 1 & 2 at Physic Garden, as per hi
Coordinates & Levels of Kicker for Outer Canopy 1 & 2 at Physic Garden, as per highlighted area in a
Level and Location for BUTTRESS BII BIV 68, 69 (1st) Zone 2C
Excavation and Removal of Disposal Materials ( -75cm ) from Raods and Parking Area - as per the atta
Slated layer 4mm thk Modified Bituminous water proofing membrane for Boundary wall foundation (I
"INSPECTION FOR MANHOLE BASE INSTALLATION, UPVC PIPE CONNECTION AND CASTING CONCRETE FOR SH
Protection layer of 4mm thick bituminous protection board for Pilecaps 117, 119, 120, 121, 122, 123, 1
Slated layer 4mm thk Modified Bituminous water proofing membrane for Boundary wall foundation (I
Steel Reinforcement for BUTTRESS BOV BOI 128 Zone 2R
Inspection of Concrete Pouring for the Foundation of Seating Area (3) at Zone-G (SA-31) As Highlighted
Shear Connector for BUTTRESS BOI 66, 67 Zone 2B & 2C
Shear Connector for BUTTRESS BOI 72, 73, 74 Zone 2D
Concreting for BUTTRESS BII BIV 68, 69 Zone 2C
Shear Connector for BUTTRESS BII BIV 68, 69 Zone 2C
Protection layer 4mm thk Bituminous protection board for Boundary wall foundation (Inner Face) at
Shuttering for BUTTRESS BII BIV 68, 69 Zone 2C
Protection layer 4mm thk Bituminous protection board for Boundary wall foundation (Inner Face) at
Steel Reinforcement for BUTTRESS BOI BOV 69 Zone 2C
Level and Location for Mass Concrete under strip footing between PC 166-168-170, 172-174 Zone 2M
Level and Location for BUTTRESS BOI 103, 104, 105 Zone 2L
Level and Location for BUTTRESS BOI 72, 73, 74 Zone 2D
Level and Location for Excavation of strip footing between PC 122-124-126- at zone 2E (as highlighted)
Level and Location for PILECAPS 151, 156, 158 Zone 2K
Level and Location for PILECAPS 145, 147, 149 Zone 2H 2J
Protection layer of 4mm thick bituminous protection board for south tower bridge foundation
Single layer of 4mm thick modified bituminous water proofing membrane for south tower bridge founda
Concreting for Mass Concrete of strip footing at Zone 2M Between PC 166-168-167, 172-174
Shuttering for Mass Concrete of strip footing at Zone 2M Between PC 166-168-167, 172-174
Anti Termite under Mass Concrete of strip footing at Zone 2M Between PC 166-168-167, 172-174
Concreting for Mass Concrete of strip footing at Zone 2N Between PC 180-182
Shuttering for Mass Concrete of strip footing at Zone 2N Between PC 180-182
Anti Termite under Mass Concrete of strip footing at Zone 2N Between PC 180-182
Concreting for BUTTRESS BOI 103, 104, 105 Zone 2L
Shuttering for BUTTRESS BOI 103, 104, 105 Zone 2L
Concreting for BUTTRESS BOI 72, 73, 74 Zone 2D
Shuttering for BUTTRESS BOI 72, 73, 74 Zone 2D
"Inspection for Casting the Blinding Concrete under the Gully (G-X-05) (as Highlighted)"
Excavation for Storm Water Line from MH-D-04 to MH-D-05, including Manhole MH-D-04, MH-D-05 (as
Concrete Surface Preperation prior to start the Waterproofing for Seating Area (2) at Zone-K (SA-40) As
Concrete Surface Preperation prior to start the Waterproofing for Seating Area (3) at Zone-K (SA-35) As
Concrete Surface Preperation prior to start the Waterproofing for Seating Area (3) at Zone-K (SA-30) As
Inspection for Backfilling Sub-base under Boulder no. RB-329
"Inspection of Concrete Pouring for the Wall of Seating Area (2) at Zone-G (SA-39) As Highlighted"
"Inspection of Formwork for the Wall of Seating Area (2) at Zone-G (SA-39) As Highlighted"
Solvent base primer for strip footing between PC 110-112 zone 2D
Steel Reinforcement for BUTTRESS BOI BOV 52, 53 Zone 1N
Concreting for PILCAPS 151, 156, 158 ZONE 2K
Installation of Rock and Boulder No. RB-307a (2nd Layer)
Inspection for Filling Floor Joints (Horizontal) and Final Completion of Rock and Boulder No. RB-286
Inspection for Gullies Installation, Pipe Connection and Casting Concrete for Short Piece - G-X-2 , G-X-3,
Inspection for Catch basin Installation, Backdrop, Pipe Connection and Casting Concrete for Short Piece
Shuttering for PILCAPS 151, 156, 158 ZONE 2K
Steel Reinforcement for PILCAPS 151, 156, 158 ZONE 2K
Bedding of Gravel 3/8" and Geotextile surrounding Storm Water Line Outfall-D for (160mmØ-UPVC-
Pipe Installation of Storm Water Line Outfall-D for (160mmØ-UPVC- Class 4) 50m Length from (MH-
Pipe Installation of Foul Water Line (315mmØ-UPVC- Class 4) 48m Length from (FW-A-3-6.4 to FW-A-3
Bedding of Gravel 3/8" and Geotextile surrounding Foul Water Line (315mmØ-UPVC- Class 4) 48m Len
Installation of straight UPVC conduit (Dia. 25mm) and Box for Voice and Data (WIFI) at the Crescent-01
Installation of straight UPVC conduit (Dia. 25mm) and Box for Fire Alarm (Speaker) at the Crescent-01 (
Installation of straight UPVC conduit (Dia.32mm Socket Outlet) for Power at the Crescent-01 (Axis 01/
Steel Reinforcement for Kicker of Outer Canopy 1 & 2, at Physic Garden, as per highlighted area in a
Concrete pouring for Blinding under Manholes (Type 'A' 4 no's and Type 'B' 2 no's) Inside Maze garden
Level and Location for BUTTRESS BOI 64 (2nd) Zone 2B
Surface preparation and Solvent base primer Under Strip footing Between PC 1-3-5 Zone 1A
Protection layer of 4mm thick bituminous protection board for Pilecap 89 & 90 Zone 1P
Single layer of 4mm thick modified bituminous waterproofing membrane for Pilecap 89 & 90 Zone 1P
Steel Reinforcement for BUTTRESS BII BIV 128 Zone 2R
Protection layer of 4mm thick bituminous protection board (side) foundation of MCPE 1
Protection layer of 4mm thick bituminous protection board for strip footing between PC 175-177 Zone
Single layer of 4mm thick modified bituminous waterproofing membrane for strip footing between PC
Concreting for BUTTRESS BOI 64 (2nd) Zone 2B
Shuttering for BUTTRESS BOI 64 (2nd) Zone 2B
Inspection of Spatter Dash (Rough Coat) prior to Internal Plastering for walls Inside Vehicle Mainte
Pipe Installation of Storm Water Line - Out Fall A for (Ø 315mm - UPVC - Class 4 ) -16 m Length
Bedding of Gravel 3/8" and Geotextile surrounding Storm Water Line - Out Fall A for (Ø 315mm -
Warning Tape Installation for Storm Water Line Outfall-X for (450mmØ-UPVC- Class 4) 19m Length
Installation of straight UPVC conduit (Dia. 25mm) and Box for Fire Alarm (Speaker) at the Crescent-02 (
Installation of straight UPVC conduit (Dia. 25mm: ) and Box for Voice and Data (WIFI) at the Crescent-0
Installation of straight UPVC conduit (Dia. 25mm - CCTV &32mm-Media Converter) and Box for Security
Installation of straight UPVC conduit (Dia. 25mm) and Box for Fire Alarm (Break Glass) at the Crescent-
Installation of straight UPVC conduit (Dia. 25mm & 32mm 2pcs. Each ) and Box for Voice and Data (CCTV
Installation of straight UPVC conduit (Dia. 25mm - CCTV &32mm) and Box for Security (CCTV) at the Cre
INSPECTION FOR GULLIES INSTALLATION, PIPE CONNECTION AND CASTING CONCRETE FOR SHORT PIECE - G
Level and Location for BUTTRESS BOI 120-121 Zone 2Q-2P
Level and Location for BUTTRESS BII BIV 104 (1st) as highlighetd Zone 2L
Level and Location for BUTTRESS BII BIV 127 Zone 2R
Level and Location for BUTTRESS BOI BOV 124 & 125 (1ST) Zone 2Q
Level and Location for BUTTRESS 66-67 Zone 2B & 2C
Level and Location for PILECAPS 146 Zone 2J, 2K
Steel Reinforcement for BUTTRESS BOI BOV 68 Zone 2B
Surface Preparation and Solvent Base Primer for Pilecap 89 & 90 Zone 1P
Concreting for Buttress BII BIV 104 (1st) As highlighted Zone 2L
Excavation for Storm Water Line from MH-D-06 to MH-D-07, including Manhole MH-D- 06 (as Highlighte
Inspection of Concrete Pouring for the Foundation of Seating Area (2) at Zone-K (SA-42) As Highlighted
"Inspection of Formwork for the Foundation of Seating Area (2) at Zone-K (SA-42) As Highlighted"
Inspection of Steel Reinforcement for the Foundation and Wall of Seating Area (2) at Zone-K (SA-42) As
Soil Preparation under Boulder No.RB- 329 after cutting.
Excavation for Storm Water Line from MH-D-08-01 to MH-D-08-02, including Manhole MH-D-08-02 (as H
Inspection for Filling Floor Joints (Horizontal) and Final Completion of Rock and Boulder No. RB-326a
Installation of Rock and Boulder No. RB-154 (2nd Layer)
Inspection of Concrete Pouring for the Foundation of Seating Area (2) at Zone-K (SA-31) As Highlighted
Shuttering for Buttress BII BIV 104 (1st) As highlighted Zone 2L
Concreting for BUTTRESS BOI 120-121 Zone 2Q & 2P
Shuttering for BUTTRESS BOI 120-121 Zone 2Q & 2P
Installation of straight UPVC conduit (Dia. 25mm: CCTV) and Box for Security at the Crescent-02 (Axis
Concreting for BUTTRESS BII BIV 127 (1ST) ZONE 2R
Shuttering for BUTTRESS BII BIV 127 (1ST) ZONE 2R
Installation of straight UPVC conduit (Dia. 25mm: 2Pcs each (WIFI) and Box for Voice and Data at the
Concreting for BUTTRESS BOV 66-67 Zone 2B & 2C
Shuttering for BUTTRESS BOV 66-67 Zone 2B & 2C
Concreting for PILECAPS 146 Zone 2J, 2K
Shuttering for PILECAPS 146 Zone 2J, 2K
Steel Reinforcement for PILECAPS 146 Zone 2J, 2K
Excavation & Blinding levels for Manholes (Inside 6 no's) & (Outside 2 no's) of Maze garden, as per hi
Installation of straight UPVC conduit (Dia. 25mm) and Box for Fire Alarm (Speaker & Flashing Beacon)
Installation of Rock and Boulder No. RB-154 (2nd Layer)
"Inspection for Casting the Blinding Concrete under the Manhole for FW-A-3-6.4, FW-A-3-6.5, FW-A-3-6.
Soil Preparation under Boulder No.RB- 329 prior to start cutting.
Stone Cladding for Boundary wall (Outer Face) at Elevation "E" @ Sound & Light Garden, As per Attac
Inspection of Plaster Guide Points and Plaster Accessories prior to start Spatter Dash (Rough Coat) f
Inspection of Spatter Dash (Rough Coat) Prior to Internal Plastering for walls Inside Mechanical Ma
Concrete pouring & Shuttering for Kicker (1st Lift) of Outer Canopy 3 at Physic Garden, as per highlig
Concrete pouring & Shuttering of footing for Outer Canopy 2 at Physic Garden, as per highlighted are
Concrete pouring & Shuttering of footing for Outer Canopy 1 at Physic Garden, as per highlighted are
Level and Location for PILECAPS 148, 150, 152 Zone 2J, 2K
Two layer of 4mm thick bituminous waterproofing membrane Under foundation of MCPE 1
Concreting for PILECAPS 148, 150, 152 Zone 2J, 2K
Shuttering for PILECAPS 148, 150, 152 Zone 2J, 2K
Steel Reinforcement for PILECAPS 148, 150, 152 Zone 2J, 2K
Excavation & Surface Preparation at Both Sides of Stone Boulders at Layer 2 of (Part 1 & 2) at Geyse
Single layer 4mm thk Modified Bituminous Water Proofing Membrane for Light wall (A & B) foundatio
Stone Cladding for Boundary wall (Inner Face) @ Span 7 of Water Garden, at Highlighted area in Att
Stone Cladding for Boundary wall (Inner Face) @ Span 6 of Water Garden, at Highlighted area in Att
Stone Cladding for Boundary wall (Inner Face) @ Span 5 of Water Garden, at Highlighted area in Att
Applying Crack filler to Cracks for repair (5 No's) on Parapet wall (External side) at Grid (2/K1-R) at
Sealant filling for New Conctrol Joints (02 no's) on Parapet wall (External side) at Grid (2/K1-R) at M
Installation of Rock and Boulder No. RB-307 (1st Layer)
Installation of Rock and Boulder No. RB-307a (1st Layer)
"INSPECTION FOR INSTALLATION OF RINGS UP TO BOTTOM OF SLAB FOR (FW-A-3-6.11, FW-A-3-6.12) - A
"INSPECTION FOR MANHOLE BASE INSTALLATION, UPVC PIPE CONNECTION AND CASTING CONCRETE FOR SH
"INSPECTION OF SURFACE PREPERATION FOR CONCRETE ENCASEMENT OF (G-X-2, G-X-3, G-X-4) PRIOR
Inspection of Concrete Pouring for the Foundation of Seating Area (2) at Zone-K (SA-39) As Highlighted
"Inspection of Concrete Pouring for the Wall of Seating Area (3) at Zone-K (SA-36) As Highlighted"
"Inspection of Formwork for the Wall of Seating Area (3) at Zone-K (SA-36) As Highlighted"
Inspection for Backfilling Sub-base under Boulder no. RB-308
Inspection for Backfilling Sub-base behind the rock to match the top rock level for Boulder no. RB-307a
Inspection of Plaster Guide Points and Plaster Accessories prior to start Spatter Dash (Rough Coat)
"Inspection for Backfilling Subgrade behind the 1st lift of Rock for Boulder no. RB-307a (under 2nd layer
"Inspection for Casting the Blinding Concrete under the Manhole (MH-B-02, MH-B-03, MH-B-04) (as Hig
"Inspection of Formwork for the Foundation of Seating Area (2) at Zone-K (SA-39) As Highlighted"
Inspection of Spatter Dash (Rough Coat) prior to Internal Plastering for walls Inside "Electrical Ma
Steel Reinforcement for Kicker of Outer Canopy 3 at Physic Garden, as per highlighted area in attach
Coordinates & Levels of Kicker for Outer Canopy 3 at Physic Garden, as per highlighted area in attac
Coordinates & Levels of footing for Outer Canopy 2 at Physic Garden, as per highlighted area in atta
Coordinates & Levels of Wall & Columns (Upto Bottom of Slab) of Whispering Cave 1, @ Sound & Light
Concrete Pouring & Shuttering of Wall & Columns (Upto Bottom of Slab) of Whispering Cave 1, @ Soun
Level and Location for MCPE 2 Foundation Between Axis 02-AE - 02-AF (as highlighted)
Level and Location for BUTTRESS BOV 65 (1st) Zone 2B
Level and Location for BUTTRESS BII BIV 126 (1st) Zone 2R
Concreting for MCPE 2 Foundation Between Axis 02-AE - 02-AF (as Highlighted)
Shuttering for MCPE 2 Foundation Between Axis 02-AE - 02-AF (as Highlighted)
Steel Reinforcement for MCPE 2 Foundation Between Axis 02-AE - 02-AF (as Highlighted)
Shear Connector for BUTTRESS BOV 65 Zone 2B
Concreting for BUTTRESS BOV 65 (1st) Zone 2B
Shuttering for BUTTRESS BOV 65 (1st) Zone 2B
Concreting for BUTTRESS BII BIV 126 Zone 2R
Shuttering for BUTTRESS BII BIV 126 Zone 2R
Concreting for Steel Structure & ETFE Pedestal (as highlighted) (Mock Up)
Steel Reinforcement for buttress BII BIV 103 (protection concrete) zone 2L
Surface Preparation and Solvent Base Primer for Strip footing Between PC 175-177 Zone 2N
Single layer of 4mm thick modified bituminous waterproofing membrane for pilecap 117, 119 Zone 2E
300 mm Gravel 3/8" Backfilling and Geotextile for Storm Water Line Outfall-X for (450mmØ-UPVC-
Pipe Installation of Storm Water Line Outfall-X for (450mmØ-UPVC- Class 4) 19m Length from (MH
Warning Tape Installation for Storm Water Line Outfall-D for (315mmØ-UPVC- Class 4) 65m Lengt
300 mm Gravel 3/8" Backfilling and Geotextile for Storm Water Line Outfall-D for (315mmØ-UPVC-
Single layer 4mm thk Modified Bituminous Water Proofing Membrane for Boundary wall foundation (I
Single layer 4mm thk Modified Bituminous Water Proofing Membrane for Boundary wall foundation (I
Openning of Cracks for repair (5 No's) on Parapet wall (External side) at Grid (2/K1-R) at Management
Openning of New Conctrol Joints (02 no's) on Parapet wall (External side) at Grid (2/K1-R) at Managem
Concrete pouring for Blinding under Foundation of Circular Walls (1, 2, 3, 4 & 5) inside Maze garden,
Steel Reinforcement for footing of Outer Canopy 2 at Physic Garden, as per highlighted area in attac
Inspection of Plaster Guide Points and Plaster Accessories prior to start Spatter Dash (Rough Coat) f
Inspection of Spatter Dash (Rough Coat) prior to Internal Plastering for walls Inside Metal Works Ro
Inspection for External Plastering at Elevation of Grid (6-7/X), (9-10/X) (9/W-X) at Management Buildi
Excavation & Bed preparation for Sub Surface Branch Drain Pipe (Branch pipes 110mm 10no's) along Li
Shuttering for ETFE Pedestal (as highlighted)
Steel Reinforcement for ETFE Pedestal (as highlighted)
Protection layer of geotextile sheet and 30mm screed under Strip footing Zone 2A between PC 91-93-9
Concreting for blinding under strip footing between PC 1-3-5 Zone 1A
Concreting for PILECAPS 139, 140, 141, 142, 143 & 144 Zone 2H
Protection layer of 4mm thick bituminous protection board for pilecap 82, 84, 86 Zone 1N & 1P
Single layer of 4mm thick modified bituminous waterproofing membrane for pilecap 82, 84, 86 Zone 1N
Protection layer of 4mm thick bituminous protection board for TIP 1A Foundation zone 1A
Single layer of 4mm thick modified bituminous Waterproofing for TIP 1A Foundation zone 1A
Single Layer of 4mm thick Modified Bituminous Water proofing under Strip footing Between PC 2-4-6-8
Installation of Anchor M36 gr. 8.8 L=945, M27 gr. 8.8 L=580 and Base Plate for Mock-up of ETFE
Level and Location for anchor bolt and base plate of ETFE MOCK UP installation
Installation of straight UPVC conduit (Dia.32mm) for Power (Twin Switched Socket Outlet & Fused Con
Installation of earthing clamps with conductor 70mm for earthing reinforcement steel re-bar at the P
Installation of stub-up UPVC conduit (Dia.32mm) for Security (CAM) at the Physic Garden as per attache
Installation of stub-up UPVC conduit (Dia.32mm) for Voice and Data (WIFI & CAM) at the Physic Garden
Installation of stub-up UPVC conduit (Dia.32mm) for Fire Alarm (Speaker) at the Physic Garden as per a
Installation of 75mm UPVC conduit for Low Current at the Physic Garden as per attached highlighted d
Inspection for Backfilling Sub-base behind the rock to match the top rock level for Boulder no. RB-307 (u
"Inspection for Backfilling Subgrade behind the 1st lift of Rock for Boulder no. RB-307 (under 2nd lift)"
Installation of UPVC conduit (stub-up & straight Dia. 25mm) and Box for Voice and Data (WIFI) at the
Installation of UPVC conduit (stub-up & straight Dia. 25mm) and Box for Fire Alarm (Speaker) at the Cr
Steel Reinforcement for Buttress BII BIV 53 Zone 1N
Solvent base primer for PC 117, 119 Zone 2E
Shuttering for blinding under strip footing between PC 1-3-5 Zone 1A
Anti Termite under Strip footing blinding between PC 1-3-5 Zone 1A
Protection Layer of 4mm thick bituminous protection board for PILECAP 120, 121, 122, 123, 124, 125, 1
Concreting for Strip footing blinding between PC 174-176-178-180-182 Zone 2N
Shuttering for Strip footing blinding between PC 174-176-178-180-182 Zone 2N
Anti Termite under Strip footing blinding between PC 174-176-178-180-182 Zone 2N
Concreting for Strip Footing Between PC 8-10-12-14 Zone 1B
Shuttering for Strip Footing Between PC 8-10-12-14 Zone 1B
Steel Reinforcement for Strip Footing Between PC 8-10-12-14 Zone 1B
Concreting for Buttress BII BIV 105 (1st) As highlighted Zone 2L
Shuttering for Buttress BII BIV 105 (1st) As highlighted Zone 2L
Surface Preparation Prior to start Backfilling beside strip footing as highlighted Zone 1A, 1B, 1C (as highl
Level and Location for Blinding of Strip Footing Between PC 1-3-5 as highlighetd Zone 1A
Level and Location for Blinding of Strip Footing Between PC 174-176-178-180-182 as highlighetd Zone 2
Level and Location for Strip Footing Between PC 8-10-12-14 as highlighetd Zone 1B
Level and Location for BUTTRESS BII BIV 105 (1st) as highlighetd Zone 2L
Level and Location for BUTTRESS BOI 122 (2nd) Zone 2Q
Soil Preparation under Boulder No.RB- 308 prior to start cutting.
Level and Location for BUTTRESS BOI 123 (2nd) Zone 2Q
Inspection for Catch basin Installation, Pipe Connection and Casting Concrete for Short Piece - G-X-2 , G
Inspection for Catch basin Installation, Backdrop, Pipe Connection and Casting Concrete for Short Piece
Concrete Surface Preperation prior to start the Waterproofing for Seating Area (3) at Zone-K (SA-34) As
Concrete Surface Preperation prior to start the Waterproofing for Seating Area (3) at Zone-K (SA-27) As
Concrete Surface Preperation prior to start the Waterproofing for Seating Area (3) at Zone-K (SA-26) As
Installation of Rock and Boulder No. RB-308a (3rd Layer)
Notification to Start Boulder Construction for Boulder RB-108 and RB-109 as per attached Approved Dra
Installation of Rock and Boulder No. RB-308a (1st Layer)
"Inspection for Application of Primer (3rd Coat) for Concrete Encasement - (G-X-1, G-X-6, MH-X-02,
"Inspection for Application of Primer (2nd Coat) for Concrete Encasement - (G-X-1, G-X-6, MH-X-02,
"Inspection for Application of Primer (1st Coat) for Concrete Encasement - (G-X-1, G-X-6, MH-X-02,
"INSPECTION OF SURFACE PREPERATION FOR CONCRETE ENCASEMENT OF (G-X-1, G-X-6, MH-X-02, MH-X-
Excavation for Foul Water Line from FW-A-3-6.4 to FW-A-3-6.6 including the Manhole FW-A-3-6.4 & FW-A
Inspection for Backfilling Sub-base behind the rock to match the top rock level for Boulder no. RB-308a
"Inspection for Backfilling Subgrade behind the 1st lift of Rock for Boulder no. RB-308a (under 2nd lift)"
Solvent Base Primer Coating for Foundation of Boundary wall (Inner Face) at Grid (16-23/Right Side) &
Coordinates & Levels of footing for Outer Canopy 1 at Physic Garden, as per highlighted area in atta
Surface Preparation and Solvent Base Primer under Strip footing Between PC 2-4-6-8 Zone 1A
Excavation for Storm Water Line from MH-D-08 to MH-D-08-01, including Manhole MH-D-08-01 (as High
Concrete Surface Preperation prior to start the Waterproofing for Seating Area (2) at Zone-K (SA-31) As
Concrete Surface Preperation prior to start the Waterproofing for Seating Area (3) at Zone-K (SA-33) As
Inspection of Concrete Pouring for the Beam of Seating Area (1) at Zone-G (SA-13) As Highlighted
"Inspection of formwork for the Beam of Seating Area (1) at Zone-G (SA-13) As Highlighted"
Inspection of Steel Reinforcement for the Beam of Seating Area (1) at Zone-G (SA-13) As Highlighted
Installation of Rock and Boulder No. RB-308a (2nd Layer)
Steel Reinforcement for buttress BII BIV 104 (protection concrete) zone 2L
Shuttering for PILECAPS 139, 140, 141, 142, 143 & 144 Zone 2H
Steel Reinforcement for PILECAPS 139, 140, 141, 142, 143 & 144 Zone 2H
Surface Preparation and Solvent Base Primer Under foundation of MCPE 1
Surface Preparation and Solvent Base Primer for Pilecap 133, 135, 137 zone 2G
Surface Preparation and Solvent Base Primer under Strip footing Between PC 7-9-11-13 Zone 1B
Inspection of Spatter Dash (Rough Coat) Prior to External Plastering at Elevation of Grid (9-10/X) (9
Inspection of Plaster Guide Points and Plaster Accessories prior to start Spatter Dash (Rough Coat) f
Inspection of Plaster Guide Points and Plaster Accessories prior to start Spatter Dash (Rough Coat) fo
Steel Reinforcement for footing of Outer Canopy 1 at Physic Garden, as per highlighted area in attac
Level and Location for PILECAPS 139, 140, 141, 142, 143, 144 Zone 2H
Surface Preparation Prior to start Backfilling around pilecap 121, 123, 125 as highlighted Zone 2E
Concrete pouring & Shuttering for footing of Outer Canopy 3 at Physic Garden, as per highlighted are
Level and Location for BUTTRESS BOI BOV 66 & 67 Zone 2B & 2C
Concreting for BUTTRESS BOI BOV 66 & 67 Zone 2B & 2C
Shear Connector for BUTTRESS BOI BOV 66 & 67 Zone 2B & 2C (as highlighted)
Shuttering for BUTTRESS BOI BOV 66 & 67 Zone 2B & 2C
Single layer of 4mm thick modified bituminous Waterproofing membrane for Pilecap 128, 130, 132, 134
Surface Preparation and solvent base primer for Pilecap 128, 130, 132, 134, 136, 138 Zone 2F & 2G
Single layer of 4mm thick modified bituminous Waterproofing membranefor Strip footing Zone 2A bet
Surface Preparation and solvent base primer for Strip footing Zone 2A between PC 91-93-95-97 & 94-96
Concreting for BUTTRESS BOI - 122 (2nd) Zone 2Q
Inspection for backfilling 3/8 Gravel around the Catch Basin and under the pipe for (G-B-1, G-B-2, G-B-3
"Soil Preperation Prior to Start Backfill Gravel for Catch Basin G-B-1, G-B-2, G-B-3, G-B-4, G-B-5, G-B-6 (
"Inspection for Application of Primer (3rd Coat) for Concrete Encasement - (G-B-10, G-B-11, G-B-12) (As
"Inspection for Application of Primer (2nd Coat) for Concrete Encasement - (G-B-10, G-B-11, G-B-12) (As
"Inspection for Application of Primer (1st Coat) for Concrete Encasement - (G-B-10, G-B-11, G-B-12) (As
"INSPECTION OF SURFACE PREPERATION FOR CONCRETE ENCASEMENT OF (G-B-10, G-B-11, G-B-12) PRI
"Inspection for Casting the Blinding Concrete under the Manhole (MH-B-02, MH-B-03, MH-B-04) (as Hig
INSTALLATION of HVAC DUCT INSULATION WORKS in MANAGEMENT BLDG. (COMBINE OF ALL APPROVED
"Inspection of Concrete Pouring for the Wall of Seating Area (1) at Zone-L (SA-15) As Highlighted"
"Inspection of Formwork for the Wall of Seating Area (1) at Zone-L (SA-15) As Highlighted"
Excavation for Foul Water Line from FW-A-3-6.6 to FW-A-3-6.7 including the Manhole FW-A-3-6.6 prior t
"SURFACE PREPERATION OF CONCRETE SHORT PIECE FOR (MH-B-01, G-B-10, G-B-11, G-B-12, MH-X-03,
"Inspection of Concrete Pouring for the Wall of Seating Area (3) at Zone-L (SA-38) As Highlighted"
"Inspection of Formwork for the Wall of Seating Area (3) at Zone-L (SA-38) As Highlighted"
"Inspection of Concrete Pouring for the Beam of Seating Area (1) at Zone-G (SA-12) As Highlighted"
Installation of earthing clamps with conductor 70mm (1pc.) for earthing reinforcement steel re-bar a
Shuttering for BUTTRESS BOI - 122 (2nd) Zone 2Q
Level and Location for BUTTRESS BOI 122 (2nd) Zone 2Q
Level and Location for BUTTRESS BOV 103, 104, 105 (2nd) Zone 2L
Shear Connector for BUTTRESS BII 66 & 67 Zone 2B & 2C
Protection layer of geotextile sheet and 30mm screed protectiond for below PC 141, 142, 143, 144, 14
Concreting for PILECAPS 89 & 90 Zone 1P
Concreting for BUTTRESS BOV 103, 104, 105 (2nd) zone 2L
Shuttering for BUTTRESS BOV 103, 104, 105 (2nd) zone 2L
Protection layer of 4mm thick bituminous protection board under PILECAP 55 to 66 zone 1J & 1K
Single layer of 4mm thick modified bituminous WP under PILECAP 55 to 66 zone 1J & 1K
Protection layer of 4mm thick bituminous protection board under PILECAP 47 to 54 zone 1H
Installation of Rock and Boulder No. RB-308a (1st Layer)
Installation of Rock and Boulder No. RB-296 (3rd Layer)
Installation of Rock and Boulder No. RB-296 (2nd Layer)
Installation of Rock and Boulder No. RB-154 (1st Layer)
Installation of Rock and Boulder No. RB-296 (1st Layer)
Surface Preparation prior to Water proofing for Boundary wall Foundation (Inner Face) at Grid (16-23/
Coordinates & Level of Blinding under Foundation of Circular Walls (1, 2, 3, 4 & 5) inside Maze garden
Excavation & Surface Preparation for Foundation of Circular Walls (1, 2, 3, 4 & 5) inside Maze garden,
Solvent Base Primer Coating prior to membrane Water Proofing for Boundary wall foundation (Inner F
Solvent Base Primer Coating prior to membrane Water Proofing for Light wall (A & B) foundations (Al
Stone Cladding for Boundary wall (Inner Face) @ Span 43 of Water Garden, at Highlighted area in At
Stone Cladding for Boundary wall (Inner Face) @ Span 11 of Water Garden, at Highlighted area in At
Stone Cladding for Boundary wall (Inner Face) @ Span 10 of Water Garden, at Highlighted area in At
Installation of straight UPVC conduit (Dia.32mm) for Power (Twin Switched Socket Outlet & Fused Con
Installation of 75mm UPVC conduit for Low Current (at the Physic Garden as per attached highlighted d
Installation of stub-up UPVC conduit (Dia.25mm) for Security (CCTV System) at the Physic Garden as pe
Installation of stub-up UPVC conduit (Dia.25mm) for Voice and Data (WIFI & CAM) at the Physic Garden
Installation of stub-up UPVC conduit (Dia.25mm) for Fire Alarm (Speaker) at the Physic Garden as per a
"Inspection of Formwork for the Foundation of Seating Area (2) at Zone-K (SA-39) As Highlighted"
Inspection for Casting the Concrete Encasement for the Storm Water Line Catch Basin G-B-12 (as Highli
Inspection for Backfilling Sub-base behind the rock to match the top rock level for Boulder no. RB-308a
Inspection for Backfilling Subgrade behind the 1st lift of Rock for Boulder no. RB-308a
Concrete Surface Preperation prior to start the Waterproofing for Seating Area (3) at Zone-K (SA-32) As
Concrete Surface Preperation prior to start the Waterproofing for Seating Area (3) at Zone-G (SA-31) As
Installation of Rock and Boulder No. RB-154 (3rd Layer)
Steel Reinforcement for buttress BII BIV 105 (protection concrete) zone 2L
Concreting for BUTTRESS BII 66 & 67 Zone 2B & 2C
Shuttering for BUTTRESS BII 66 & 67 Zone 2B & 2C
Surface Preparation and solvent base primer for TIP 1A Foundation zone 1A
Steel Reinforcement for BUTTRESS BOI BOV 127 Zone 2R
Surface Preparation and solvent base primer for south watch tower bridge foundation Zone2A
Level and Location for BUTTRESS BII 66 & 67 Zone 2B & 2C
Inspection of External Plastering at Elevation of Grid (X/6-7) at Management Building, as highlighted
Inspection of External Plastering at Elevation of Grid (2/A-K1) at Management Building, as highlighte
Pipe Installation of Storm Water Line Outfall-D for (315mmØ-UPVC- Class 4) 65m Length from (MH
Bedding of Gravel 3/8" and Geotextile surrounding Storm Water Line Outfall-D for (315mmØ-UPVC
Warning Tape Installation for Storm Water Line Outfall-X for (315mmØ-UPVC- Class 4) 26m Length
300 mm Gravel 3/8" Backfilling and Geotextile for Storm Water Line Outfall-X for (315mmØ-UPVC-
Pipe Installation of Storm Water Line Outfall-X for (315mmØ-UPVC- Class 4) 26m Length ( 8 m Con
Bedding of Gravel 3/8" and Geotextile surrounding Storm Water Line Outfall-X for (315mmØ-UPVC-
Bedding of Gravel 3/8" and Geotextile surrounding Storm Water Line Outfall-X for (450mmØ-UPVC-
Warning Tape Installation for Foul Water Line (315mmØ-UPVC- Class 4) 65m Length from (FW-A-3-6.7
300 mm Gravel 3/8" Backfilling and Geotextile for Foul Water Line (315mmØ-UPVC- Class 4) 65m Len
Warning Tape Installation for Storm Water Line Outfall-X for (400mmØ-UPVC- Class 4) 63m Lengt
300 mm Gravel 3/8" Backfilling and Geotextile for Storm Water Line Outfall-X for (400mmØ-UPVC-
Installation of fire fighting in SECURITY & FIRE CONTROL; as per high lighted in dwg.
Steel Reinforcement for Wall & Columns of Whispering Cave 1, at Sound & Light Garden, At highlight
Level and Location for BUTTRESS BOV 72 Zone 2D
Concreting for BUTTRESS BOV 72 Zone 2D
Shuttering for BUTTRESS BOV 72 Zone 2D
Level and Location for BUTTRESS BOI 123 (2nd) Zone 2Q
Concreting for BUTTRESS BOI 123 (2nd) Zone 2Q
Shuttering for BUTTRESS BOI 123 (2nd) Zone 2Q
Single layer of 4mm thick modified bituminous WP for PILECAP 120, 121, 122, 123, 124, 125, 126, 127,
Stone Cladding for Boundary wall (Inner Face) @ Span 30 of Water Garden, at Highlighted area in At
Stone Cladding for Boundary wall (Inner Face) @ Span 29 of Water Garden, at Highlighted area in At
Coordinates & Levels of footing for Outer Canopy 3 at Physic Garden, as per highlighted area in atta
Installation of Rock and Boulder No. RB-154 (2nd Layer)
Installation of Rock and Boulder No. RB-296 (1st Layer)
Inspection for Casting the Blinding Concrete under the Manhole (FW7, FW8, FW9-1, FW13, FW14) - As H
INSPECTION OF CASTING CONCRETE FOR SHORT PIECE FOR STORM WATER LINE, MANHOLE - MH-X-03 (As
Inspection for Casting the Concrete Encasement for the Storm Water Line Catch Basin G-B-10 and G-B-11
Level and Location for blinding of Strip Footing between PC 93-95, 94-96 zone 2A
Level and Location for blinding of Strip Footing between PC 2-4-6-8 zone 1A
Level and Location for PILECAP 25 Zone 1D
Concreting for blinding of strip footing between PC 93-95 & 94-96 zone 2A
Shuttering for blinding of strip footing between PC 93-95 & 94-96 zone 2A
Anti Termite application under blinding of strip footing between PC 93-95 & 94-96 zone 2A
Concreting for strip footing blinding at Zone 1A Between PC 2 - 4 - 6 - 8
Shuttering for strip footing blinding at Zone 1A Between PC 2 - 4 - 6 - 8
Anti Termite application under strip footing blinding at Zone 1A Between PC 2 - 4 - 6 - 8
Protection layer of 4mm thick bituminous protection board for PILECAP 93, 94, 95, 96, 97, 98 zone 2A
Installation of Rock and Boulder No. RB-296 (2nd Layer)
Installation of Rock and Boulder No. RB-154 (1st Layer)
Installation of Rock and Boulder No. RB-149 (1st Layer)
"INSPECTION FOR INSTALLATION OF SLABS FOR (FW1-2, FW1-2.1, FW1-3, FW5, FW6, FW7, FW8, FW9, F
"INSPECTION FOR INSTALLATION OF RINGS UP TO BOTTOM OF SLAB FOR (FW1-2, FW1-3, FW1-3.2, FW5,
INSPECTION FOR BACKFILLING GRAVEL (3/8) AROUND THE MANHOLES FOR - FW1-3 (As Highlighted) STO
"Soil Preparation Prior to Start Backfill Gravel for Manhole FW1-3 - as Highlighted"
"Inspection for Application of Primer (3rd Coat) for Concrete Short Piece of FW1-2, FW1-3, FW1-3.1 (As
"Inspection for Application of Primer (2nd Coat) for Concrete Short Piece of FW1-2, FW1-3, FW1-3.1 (As
"Inspection for Application of Primer (1st Coat) for Concrete Short Piece of FW1-2, FW1-3, FW1-3.1 (As
SURFACE PREPERATION OF CONCRETE SHORT PIECE FOR (FW1-2, FW1-3, FW1-3.1) PRIOR TO START WAT
Installation of UPVC straight conduit (Dia.110mm sleeve) for Low Current Cables (Data,FA,ICT & Secu
Stone Cladding for Boundary wall (Outer Face) @ Span 44 of Water Garden, at Highlighted area in At
Stone Cladding for Boundary wall (Outer Face) @ Span 43 of Water Garden, at Highlighted area in At
3rd Coat (Final) Cementitious Water proofing for Boundary wall (at Above Kicker) (Inner Face) at Ele
Aluminium Flashing & Sealant for water proofing on Foundation of Boundary wall (Outer Faces) of Sp
Slated layer 4mm thk Modified Bituminous water proofing membrane for Foundation of Boundary wall
Steel Reinforcement for footing of Outer Canopy 3 at Physic Garden, as per highlighted area in attac
Inspection of Spatter Dash (Rough Coat) prior to External Plastering at Elevation of Grid (2/A-K1) at
Installation of straight UPVC conduit (Dia.25mm) and Box for Security (CCTV System) at the Crescent-
Installation of straight UPVC conduit (Dia.32mm Socket Outlet) for Power at the Crescent -02 (Axis 02/
Installation of straight UPVC conduit (Dia. 25mm) and Box for Security (CCTV System) at the Crescent-0
Installation of straight UPVC conduit (Dia.32mm Socket Outlet) for Power at the Crescent -02 (Axis 0
Surface Preparation Prior to start Backfilling around pilecap 181 & 183 as highlighted
Level and Location for PILECAP 89 & 90 Zone 1P
Level and Location for BUTTRESS BOV 73 & 74 Zone 2D
Level and Location for BUTTRESS BOI BOV 120, 121 (2nd) Zone 2P & 2Q
Level and Location for MCPE 2 FOUNDATION Zone 2K AXIS 02-AG TO 02-AF (As Highlighted)
Level and Location for BUTTRESS BOV 64 (2nd) Zone 2B
Concreting for PILECAPS 89 &90 Zone 1P
Shuttering for PILECAPS 89 &90 Zone 1P
Steel Reinforcement for PILECAPS 89 &90 Zone 1P
Concreting for BUTTRESS BOV 73 & 74 Zone 2D
Shuttering for BUTTRESS BOV 73 & 74 Zone 2D
Concreting for BUTTRESS BOI BOV 120 & 121 (2ND) Zone 2Q & 2P
Shuttering for BUTTRESS BOI BOV 120 & 121 (2ND) Zone 2Q & 2P
Concreting for MCPE 2 Foundation, Zone 2K, Axis 02-AG to 02-AF (as highlighted)
Shuttering for MCPE 2 Foundation, Zone 2K, Axis 02-AG to 02-AF (as highlighted)
Steel Reinforcement for MCPE 2 Foundation with starter bars, Zone 2K, Axis 02-AG to 02-AF (as highligh
Concreting for BUTTRESS BOV 64 (2nd) Zone 2B
Shuttering for BUTTRESS BOV 64 (2nd) Zone 2B
Concreting for blinding of strip footing between PC 91 -93 zone 2A
Shuttering for blinding of strip footing between PC 91 -93 zone 2A
Anti Termite application under blinding of strip footing between PC 91 -93 zone 2A
Installation of UPVC straight conduit (Dia.25mm) and Box for Fire Alarm (Speaker) at the Maintenanc
"Inspection of Concrete Pouring for Foundation and Kicker of SBC-09 As Highlighted"
Installation of Rock and Boulder No. RB-296 (1st Layer)
"Inspection for Casting the Blinding Concrete under the Manhole for FW-A-3-6.7, FW-A-3-6.8,FW-A-3-6
Excavation for Storm Water Line from MH-D-07 to MH-D-08, including Manhole MH-D- 07 (as Highlighte
"Inspection of Concrete Pouring for the Wall of Seating Area (3) at Zone-L (SA-38) As Highlighted"
"Inspection of Formwork for the Wall of Seating Area (3) at Zone-L (SA-38) As Highlighted"
Aluminium Flashing & Sealant for water proofing on Foundation of Boundary wall (Inner Face) @ Grid
Slated layer 4mm thk Modified Bituminous water proofing membrane for Foundation of Boundary wall (
Aluminium Flashing & Sealant for water proofing on Foundation of Boundary wall (Inner Face) @ Grid (
Slated layer 4mm thk Modified Bituminous water proofing membrane for Foundation of Boundary wall (
Concrete pouring & Shuttering of Wall (Upto Bottom of Slab) of Whispering Cave 2, @ Sound & Light G
Coordinates & Levels of Wall (Upto Bottom of Slab) of Whispering Cave 2, @ Sound & Light Garden, At
Pipe Installation of Foul Water Line (315mmØ-UPVC- Class 4) 65m Length from (FW-A-3-6.7 to FW-A-3
Inspection for Casting the Concrete Encasement for the Storm Water Line from G-X-1 to MH-X-03 (as Hi
INSPECTION OF CASTING CONCRETE FOR SHORT PIECE FOR FOUL WATER LINE, MANHOLE - FW1-, FW1-2.3
Excavation for Storm Water Line from MH-D-08 to MH-D-09, including Manhole MH-D- 08 (as Highlighte
Installation of HVAC DUCT WORKS in MANAGEMENT BLDG. (COMBINE OF ALL APPROVED RFI); as per h
Pipe Installation for Storm Water Line Outfall-X for (400mmØ-UPVC- Class 4) 63m Length from (M
Bedding of Gravel 3/8" and Geotextile surrounding Foul Water Line (315mmØ-UPVC- Class 4) 65m Le
Bedding of Gravel 3/8" and Geotextile surrounding Storm Water Line Outfall-X for (400mmØ-UPVC
Warning Tape Installation for Foul Water Line (315mmØ-UPVC- Class 4) 23m Length from (FW-A-3-6.9
300 mm Gravel 3/8" Backfilling and Geotextile for Foul Water Line (315mmØ-UPVC- Class 4) 23m Len
Level and Location for blinding of Strip Footing between PC 93-95-97, 96-98 zone 2A
Single layer of 4mm thick modified bituminous WP under PILECAP 47 to 54 zone 1H
Concreting for blinding of strip footing between PC 93-95-97, 96-98 zone 2A
Shuttering for blinding of strip footing between PC 93-95-97, 96-98 zone 2A
Anti Termite application under blinding of strip footing between PC 93-95-97, 96-98 zone 2A
Surface Preparation for RC Strip Footing Between PC 110 to 112 Zone 2D
Solvent base primer for PILECAP 125, 127, 129, 131 zone 2F
Single layer of 4mm thick modified bituminous WP for PILECAP 93, 94, 95, 96, 97, 98 zone 2A
Solvent base primer for PILECAP 93, 94, 95, 96, 97, 98 zone 2A
2nd Coat Cementitious Water proofing for Boundary wall (at Above Kicker) (Inner Face) at Elevation
1st Coat Cementitious Water proofing for Boundary wall (at Above Kicker) (Inner Face) at Elevation
2nd Coat Damp proofing for Light walls (C, D, E, F, G & H) foundations (All Sides) @ Sound & Light G
1st Coat Damp proofing for Light walls (C, D, E, F, G & H) foundations (All Sides) @ Sound & Light Ga
Base Primer Coating Prior to Damp proofing for Light walls (C, D, E, F, G & H) foundations (All Sides
2nd Coat Damp proofing for Boundary wall (Kicker top) (Inner Face) at Elevation "C, D & E" @ Sound
Inspection of Internal Plastering Inside Locker Room & Changing # GF-5060, at Grid between (4-6/U-X)
Level and Location for Strip Footing between PC 175 - 77 zone 2N
Surface preparation and solvent base primer for PILECAP 84, 86, 88 zone 1P
Steel Reinforcement for BUTTRESS BII BIV 68 & 69 ZONE 2C
Concreting for Strip footing Between PC 175 - 177 Zone 2N
INSPECTION OF UPVC PIPE CONNECTION AND CASTING CONCRETE FOR SHORT PIECE OF MANHOLE - FW1-
"INSPECTION FOR INSTALLATION OF RINGS UP TO BOTTOM OF SLAB FOR (MH-B-01) - As Highlighted "
"INSPECTION FOR INSTALLATION OF RINGS UP TO BOTTOM OF SLAB FOR (FW6 and FW9) - As Highlighte
Shuttering for Strip footing Between PC 175 - 177 Zone 2N
Soil Preparation under Boulder No. RB- 319
Soil Preparation under Boulder No. RB- 307a
Steel Reinforcement for Strip footing Between PC 175 - 177 Zone 2N
Geo-Textile on Blinding (Both Sides 500mm) of Outer Canopy 2 at Physic Garden, as per highlighted a
Protection layer 4mm thk Bituminous protection board on Blinding (Both Sides 500mm) of Outer Canop
Single layer 4mm thk Modified Bituminous Water Proofing Membrane on Blinding (Both Sides 500mm)
2nd Coat Cementitious Waterproofing on Blinding of Outer Canopy 2 at Physic Garden, as per highlig
Installation of UPVC straight conduit (Dia.25mm) and Box for Fire Alarm (Fire Alarm Flashing Beaco
Installation of Box and UPVC straight conduit (Dia.25mm) for Power (Fused connection for Hand
Level and Location for BUTTRESS BIV 66 & 67 (2ND) Zone 2B
Level and Location for BUTTRESS BOI BOV 124 & 125 (1ST) Zone 2Q
Level and Location for PILECAPS 133, 135, 137 zone 2G
Shuttering for BUTTRESS BIV 66 & 67 (2nd) Zone 2B
Coordinates & Levels for Footings (21 no's) at Back of House inside Aviary garden, At Highlighted in t
Concreting for Tunnel 2 Wall (1st) as highlighted zone 2F
Surface Preparation Prior to start water proofing for PC 93, 94, 95, 96, 97, 98 Zone 2A
Soil Preparation under Boulder No.RB- 154
Concreting for BUTTRESS BOI BOV 124 & 125 (1st) Zone 2Q
Inspection for Casting Blinding Concrete under the Catch Basin (G-X-2, G-X-3 and G-X-4) as Highlighted
Excavation for Storm Water Line Catch Basin G-X-2, G-X-3, G-X-4 prior to start blinding concrete (as High
Concreting for BUTTRESS BIV 66 & 67 (2nd) Zone 2B
INSPECTION FOR BACKFILLING GRAVEL (3/8) AROUND THE MANHOLES FOR - FW15 and FW16 (As Highlig
"Soil Preparation Prior to Start Backfill Gravel for Manhole FW15 and FW16 - as Highlighted"
Shuttering for BUTTRESS BOI BOV 124 & 125 (1st) Zone 2Q
Soil Preparation under Boulder No.RB- 308a
Concreting for Pilecaps 133, 135, 137 Zone 2G
Soil Preparation under Boulder No.RB- 307
"Inspection of Concrete Pouring for the Wall of Seating Area (3) at Zone-G (SA-31) As Highlighted"
"Inspection of Concrete Pouring for the Wall of Seating Area (2) at Zone-K (SA-31) As Highlighted"
"Inspection of Formwork for the Wall of Seating Area (3) at Zone-G (SA-31) As Highlighted"
"Inspection of Formwork for the Wall of Seating Area (2) at Zone-K (SA-31) As Highlighted"
Shuttering for Pilecaps 133, 135, 137 Zone 2G
1st Coat Damp proofing for Boundary wall (Kicker top) (Inner Face) at Elevation "C, D & E" @ Sound
Steel Reinforcement for Pilecaps 133, 135, 137 Zone 2G
Base Primer Coating Prior to Damp proofing for Boundary wall (Kicker top) (Inner Face) at Elevation
Surface Preparation prior to Water proofing for Light wall (D) foundation (All Sides) @ Sound & Ligh
Inspection of Plaster Guide Points and Plaster Accessories prior to start Spatter Dash (Rough Coat) fo
Concreting of Buttress BII-BIV 120 and 121 (2nd) at Zone 2Q & 2P
Inspection of Internal Plastering Inside Locker Room & Changing # GF-5059, at Grid between (4-6/R-U)
Concreting for MCPE 3 WALL at AXIS 03-A as highlighted at zone 2E
1st Coat Cementitious Waterproofing on Blinding of Outer Canopy 2 at Physic Garden, as per highligh
Solvent Base Primer Coating prior to Waterproofing membrane on Blinding (Both Sides 500mm) of Out
Surface preparation prior to Waterproofing on Blinding under Foundation of Outer Canopy 2 at Physic
Concreting for BUTTRESS BII 124 & 125 (2nd) Zone 2Q
Sealant filling for New Conctrol Joints (03 no's) on Parapet wall (External side) at Grid (2/A-K1) at M
Applying Crack filler to Cracks for repair (7 No's) on Parapet wall (External side) at Grid (2/A-K1) at
Concreting for BUTTRESS BII 123 (2nd) Zone 2Q
Concreting for BUTTRESS BOI BOV 64 (1st) Zone 2B
Concreting for BUTTRESS BIV 65 (2ND) Zone 2B
Concreting for BUTTRESS BII 115 (1 mtr. from bottom of ring beam) as highlighted
Concreting for Pilecap 27 & 29 Zone 1E
Concreting for PILECAP 138 Zone 2G
"(‫ )حسبتـــوجـيهـ صــاحـباــلصالحـية ازاــلة اعماــلاــلمرحـلة اــلثانـية‬Notification to Start Excavation and Removal of Existing Manholes and Pipe N
Inspection for Casting the Concrete Encasement for the Storm Water Line from G-X-05 to Main Line (as
Soil Preperation prior to start backfilling sub-base under beam of Seating Area (3) at Zone-K (SA-24) - A
Inspection for Casting the Blinding Concrete under Beam of Seating Area (3) at Zone-K (SA-28) As Highl
Inspection for Casting the Blinding Concrete under Beam of Seating Area (2) at Zone-L (SA-37) As Highl
"Inspection of Concrete Pouring for the Beam of Seating Area (1) at Zone-G (SA-12) As Highlighted"
Pipe installation of Foul Water Line (315mmØ-UPVC- Class 4) 23m Length from (FW-A-3-6.9 to FW-A-3
Steel Reinforcement for BUTTRESS BOV BOI 126 Zone 2R
Bedding of Gravel 3/8" and Geotextile surrounding Foul Water Line (315mmØ-UPVC- Class 4) 23m Len
Concreting for Buttress BOI-116 & 117 at Zone 2N & 2P
Level and Location for BUTTRESS BOV 103, 104, 105 Zone 2L
Warning Tape Installation for Foul Water Line for (225mmØ-UPVC- Class 4) 24 m Length from (FW-A-
300 mm Gravel 3/8" Backfilling and Geotextile for Foul Water Line for (225mmØ-UPVC- Class 4) 24
Concreting for BUTTRESS BOV 103, 104, 105 zone 2L
Shuttering for BUTTRESS BOV 103, 104, 105 zone 2L
Concreting for Pilecap 28 & 30 Zone 1E
Surface preparation prior to start waterproofing for PILECAP 125, 127, 129, 131 zone 2F
Concrete pouring & Shuttering for Footings (21 no's) at Back of House inside Aviary garden, At Highli
Concreting for PILECAP 134 Zone 2G
Steel Reinforcement for Footings (21 no's) at Back of House inside Aviary garden, At Highlighted in t
Inspection of External Plastering at Elevation of Grid (3/R-X) at Management Building, as highlighted
Steel Reinforcement for Wall of Whispering Cave 2, @ Sound & Light Garden, At highlighted area in
Concreting for BUTTRESS BOI BOV - 120 & 121 (2nd) Zone 2P & 2Q
SHuttering for BUTTRESS BOI BOV - 120 & 121 (2nd) Zone 2P & 2Q
Concreting for BUTTRESS BOV - 122 & 123 (2nd) Zone 2Q
Shuttering for BUTTRESS BOV - 122 & 123 (2nd) Zone 2Q
Concreting for PILECAP 23, 25 zone 1D
SHuttering for PILECAP 23, 25 zone 1D
Steel Reinforcement for PILECAP 23, 25 zone 1D
Concreting of Mass Concrete under strip footing at Zone 1B between PC 7-9-11-13
Shuttering for Mass Concrete under strip footing at Zone 1B between PC 7-9-11-13
Anti Termite application under strip footing at Zone 1B between PC 7-9-11-13
Surface Preparation prior to Water proofing for Boundary wall foundation (Inner Face) at Elevation
Level and Location for BUTTRESS BOI BOV 120, 121 (1st) Zone 2P & 2Q
Surface preparation prior to Stone Cladding for Boundary wall (Outer Face) at Elevation "B" @ Sound
Stone Cladding for Boundary wall (Outer Face) at Elevation "D" @ Sound & Light Garden, As per Atta
Level and Location for BUTTRESS BOV 122, 123 (2nd) Zone 2Q
Stone Cladding for Boundary wall (Outer Face) at Elevation "C" @ Sound & Light Garden, As per Atta
Level and Location for PILECAP 23, 25 Zone 1D
Stone Cladding for Boundary wall (Inner Face) @ Span 28 of Water Garden, at Highlighted area in At
Level and Location of Mass Concrete under strip footing at zone 1B between PC 7-9-11-13
"Excavation for Foul Water Line from FW-A-3-6.7 to FW-A-3-6.9 including the Manhole FW-A-3-6.7, FW-A
Stone Cladding for Boundary wall (Inner Face) @ Span 27 of Water Garden, at Highlighted area in At
"Inspection for Casting the Blinding Concrete under the Catch Basin (G-X-01) (as Highlighted)"
Stone Cladding for Boundary wall (Outer Face) @ Span 26 & 27 of Water Garden, at Highlighted area
"(‫ )حسبتـــوجـيهـ صــاحـباــلصالحـية ازاــلة اعماــلاــلمرحـلة اــلثانـية‬Notification to Start Cut and Removal of Disposal Materials upto -75CM from
Concrete Pouring for Blinding under Foundation of Outer Canopy 2 at Physic Garden, as per highlight
Inspection of Steel Reinforcement for the Foundation and Wall of Seating Area (1) at Zone-L (SA-15) As
Coordinates and levels of Blinding for Foundation of Outer Canopy 2 at Physic Garden, as per highlig
"Inspection of formwork for the Beam of Seating Area (1) at Zone-G (SA-12) As Highlighted"
Openning of New Conctrol Joints (03 no's) on Parapet wall (External side) at Grid (2/A-K1) at Manage
Openning of Cracks for repair (7 No's) on Parapet wall (External side) at Grid (2/A-K1) at Management
Inspection of Steel Reinforcement for the Beam of Seating Area (1) at Zone-G (SA-12) As Highlighted
Soil Preparation prior to Backfill along the Boundary Wall (Inner Sides) of span 26 at Water Garden, a
Soil Preparation prior to Backfill along the Boundary Wall (Outer & Inner Sides) of span 40, 41 & 42
Inspection of External Plastering at Elevation of Grid (3/A-E) at Management Building, as highlighted
Installation of HVAC DUCT WORKS in SECURITY & FIRE CONTROL BLDG.; as per high lighted in dwg.
Inspection for Casting the Concrete Encasement for theStorm Water Line Catch Basin G-A-04 (As Highlig
Excavation for Storm Water Line from MH-X-03 TO G-X-01 including catch basin G-X-01, prior to start Gr
Inspection for Casting the Blinding Concrete under the Foundation of Seating Area (2) at Zone-K (SA-42)
Inspection of Concrete Pouring for the Foundation of Seating Area (1) at Zone-L (SA-15) As Highlighted
"Inspection of Formwork for the Foundation of Seating Area (1) at Zone-L (SA-15) As Highlighted"
Surface Preparation for RC Strip Footing Between PC 110 to 112 Zone 2D
Surface Preparation and Solvent Base Primer under PILECAP 47 to 66 zone 1H, 1J, 1K
Concreting for PILECAP 136 Zone 2G
Shuttering for PILECAP 134, 136, 138 Zone 2G
Steel Reinforcement for PILECAP 134, 136, 138 Zone 2G
Steel Reinforcement for BUTTRESS BOI BOV 73 & 74 Zone 2D
Surface Preparation and Solvent base primer application for PC 123 & 126 Zone 2E
Solvent base primer application for PC 120, 121, 122, 124 Zone 2E
Pipe Installation of Storm Water Line for (315mmØ-UPVC- CLASS 4) 17 m Length ( with conrete inc
Level and Location for PILECAP 134, 136, 138 Zone 2G
Pipe Installation of Foul Water Line for (110mmØ-UPVC- CLASS 4) 28 m Length ( with concrete inca
Level and Location for BUTTRESS BOI BOV 64 (1st) Zone 2B
Concreting for Strip Footing at Zone 1A TIP
Shuttering for Strip Footing at Zone 1A TIP
Anti termite under blinding of MCPE 1 zone 2M
Concreting for PILECAP 19 at Zone 1C
Concreting for PILECAP 26 at Zone 1D
Concreting of Buttress BII 64 (2nd) zone 2B
Mock-up for Grouting Color of Stone Cladding for Boundary Wall (Color of Grout # 65 from Vetonit) S
Surface preparation prior to Stone Cladding for Boundary wall at Elevation "A & G" (Outer Face) and E
Surface preparation prior to Stone Cladding for Boundary wall at Elevation "A, B & G" (Inner Face) @
Surface preparation prior to Stone Cladding for Boundary wall at Elevation "C, D & E" (Inner Face) an
Mockup for Floor & Wall Tiles type F3 & W3 (20cm x 20cm Ceramic tiles) with Tile Grout (Vetofill EG4
Inspection of External Plastering at Elevation of Grid (X/7-9) at Management Building, as highlighted
Inspection of Spatter Dash (Rough Coat) Prior to Internal Plastering Inside Locker Rooms & Changing
Aluminium Flashing & Sealant for water proofing on Foundation of Boundary wall (Inner Faces) of Sp
Slated layer 4mm thk Modified Bituminous water proofing membrane for Foundation of Boundary wall
Protection layer 4mm thk Bituminous protection board for Foundation of Boundary wall (Inner Faces)
Aluminium Flashing & Sealant for water proofing on Foundation of Boundary wall (Outer Faces) of Sp
Slated layer 4mm thk Modified Bituminous water proofing membrane for Foundation of Boundary wall
Protection layer 4mm thk Bituminous protection board for Foundation of Boundary wall (Outer Faces
Excavation & Soil Preparation for Foundation Base of Outer Canopy 2 at Physic Garden, as per highlig
INSPECTION FOR MANHOLE BASE INSTALLATION, PIPE CONNECTION AND CASTING CONCRETE FOR SHORT P
Excavation for Storm Water Line from MH-X-02 to MH-X-03, prior to start Gravel Bedding (as Highlighte
"Inspection for Casting the Blinding Concrete under the Manhole (G-B-12) (as Highlighted)"
"Inspection for Application of Primer (3rd Coat) for Concrete Short Piece of FW-15 & FW-16 (As Highligh
"Inspection for Application of Primer (2nd Coat) for Concrete Short Piece of FW-15 & FW-16 (As Highligh
"Inspection for Application of Primer (1st Coat) for Concrete Short Piece of FW-15 & FW-16 (As Highligh
SURFACE PREPERATION OF CONCRETE SHORT PIECE FOR (FW15 & FW16) PRIOR TO START WATERPROOFIN
Notification to Start backfilling and Installation of Stone Cladding for Prayer Area at Zone- K (As Highligh
Pipe installation of Foul Water Line for (225mmØ-UPVC- Class 4) 24 m Length from (FW-A-13-4 to FW
Bedding of Gravel 3/8" and Geotextile surrounding for Foul Water Line for (225mmØ-UPVC- Class 4)
Warning Tape Installation for Foul Water Line ( FW-9 to FW-11) 250mmØ pipe as per high lighted in
300 mm Gravel 3/8" Backfilling and Geotextile for Foul Water Line ( FW-9 to FW-11) 250mmØ pipe as
Surface Preparation prior to Water proofing for Boundary wall foundation (Inner Face) at Elevation "
Soil Preparation prior to Backfill along the Boundary Wall (Outer & Inner Sides) of span 48 & 49 of W
Inspection of External Plastering at Elevation of Grid (X/3-6) at Management Building, as highlighted
Protection layer of geotextile sheet and 30mm screed protectionunder strip footing between PC 175-1
Single layer of 4mm thick modified bituminous waterproofing membrane under strip footing between
Surface Preparation Prior to start Waterproofing for PILECAP 126, 128, 130, 132 zone 2F
Concreting of Buttress BII-BIV 66 & 67 (1st) zone 2B & 2C
Shuttering of Buttress BII-BIV 66 & 67 (1st) zone 2B & 2C
Level and Location for BUTTRESS BII-BIV 66 & 67 (1st) ZONE 2B & 2C
Installation of HVAC DUCT WORKS (VENTILATION) in Public Toilet # 3; as per high lighted in dwg.
Installation of HVAC DUCT WORKS (VENTILATION) in Public Toilet # 2; as per high lighted in dwg.
Installation of HVAC DUCT WORKS (VENTILATION) in Public Toilet # 1; as per high lighted in dwg.
"Inspection of Concrete Pouring for the Wall of Seating Area (3) at Zone-K (SA-33) As Highlighted"
"Inspection of Formwork for the Wall of Seating Area (3) at Zone-K (SA-33) As Highlighted"
Level and Location for BUTTRESS BII 111, 112 Zone 2M
Level and Location for BUTTRESS BOI & BII 106, 107 Zone 2L & 2M
Concreting for BUTTRESS BII 111 & 112 Zone 2M
Shuttering for BUTTRESS BII 111 & 112 Zone 2M
Concreting for BUTTRESS BOI & BII 106, 107 Zone 2L & 2M
Shuttering for BUTTRESS BOI & BII 106, 107 Zone 2L & 2M
Concreting for Pile cap 124 Zone 2E
Concreting for Pile cap 118, 122 Zone 2E
Concrete pouring & Shuttering for Kicker (2nd lift) of Whispering Cave 2, @ Sound & Light Garden, At
Soil Preparation prior to Backfill along the Boundary Wall (Outer Side) of span 38 & 39 of Water Gard
Geo-Textile on Blinding (Both Sides 500mm) of Outer Canopy 1 & 3 at Physic Garden, as per highlight
Protection layer 4mm thk Bituminous protection board on Blinding (Both Sides 500mm) of Outer Canop
Single layer 4mm thk Modified Bituminous Water Proofing Membrane on Blinding (Both Sides 500mm) o
Concreting for PILECAP 126, 128, 130, 132 ZONE 2F
Concreting for PILECAP 84, 86, 88 ZONE 1P
INSPECTION FOR MANHOLE BASE INSTALLATION AND PIPE CONNECTION FOR MANHOLE - MH-A-06 (As Hi
"Soil Preparation prior to start backfilling for Seating Area (2) at Zone-K (SA-42) - As Highlighted"
Inspection for Casting the Concrete Encasement for the Storm Water Line inside management building (
Concreting for PILECAP 21 Zone 1D
Inspection for Casting the Blinding Concrete under the Manhole for FW-A-15, FW-A-16, FW-A-17, FW-A-
Shuttering for PILECAP 21 Zone 1D
"INSPECTION FOR MANHOLE BASE INSTALLATION AND UPVC PIPE CONNECTION FOR - FW1-3, FW6-1, FW9
Steel Reinforcement for PILECAP 21 Zone 1D
Concreting of Buttress BII 65 (2nd) zone 2B
Shuttering of Buttress BII 65 (2nd) zone 2B
Concreting for PILECAP 125, 127, 129, 131 Zone 2F
Shuttering for PILECAP 125, 127, 129, 131 Zone 2F
Steel Reinforcement for PILECAP 125, 127, 129, 131 Zone 2F
Steel Reinforcement for BUTTRESS BOI BOV 72 Zone 2D
Protection layer of geotextile sheet and 50mm screed protection under strip footing between PC 8-10-
Surface Preparation and Solvent base primer under strip footing at zone 2N between PC-175-177 (as hig
Level and Location for PILECAP 21 Zone 1D
Level and Location for BUTTRESS BII 65 Zone 2B
Level and Location for pilecap 125, 127, 129, 131 Zone 2F
Level and Location for PILCAP 28 & 30 zone 1E
Inspection of Plaster Guide Points and Accessories prior to start Spatter Dash (Rough Coat) for Inter
Aluminium Flashing & Sealant for water proofing on Foundation of Boundary wall (Inner Faces) of Sp
Slated layer 4mm thk Modified Bituminous water proofing membrane for Foundation of Boundary wall
2nd Coat Cementitious Waterproofin on Blinding of Outer Canopy 1 & 3 at Physic Garden, as per high
1st Coat Cementitious Waterproofin on Blinding of Outer Canopy 1 & 3 at Physic Garden, as per highl
Solvent Base Primer Coating prior to Waterproofing membrane on Blinding (Both Sides 500mm) of Out
Surface preparation prior to Waterproofing on Blinding under Foundation of Outer Canopy 1 & 3 at Ph
Screed Protection 50mm thk on Blinding's Under Footings (21 no's) at Back of House inside Aviary gar
Protection layer 4mm thk Bituminous protection board for Boundary wall Foundation (Inner Faces) of
Single layer 4mm thk Modified Bituminous Water Proofing Membrane for Boundary wall Foundation (I
Aluminium Flashing & Sealant for water proofing on Foundation of Boundary wall (Inner Faces) of Sp
Slated layer 4mm thk Modified Bituminous water proofing membrane for Foundation of Boundary wall
Protection layer 4mm thk Bituminous protection board for Foundation of Boundary wall (Inner Faces)
Inspection of Spatter Dash (Rough Coat) prior to External Plastering at Elevation of Grid (3/A-E), (3/
Inspection of Concrete Pouring for the Foundation of Seating Area (3) at Zone-G (SA-31) As Highlighted
"Inspection of Formwork for the Foundation of Seating Area (3) at Zone-G (SA-31) As Highlighted"
Inspection of Steel Reinforcement for the Foundation and Wall of Seating Area (3) at Zone-G (SA-31) As
"Inspection for Casting the Blinding Concrete under the Catch Basin (G-A-05) (as Highlighted)"
"Inspection of Concrete Pouring for the Wall of Seating Area (3) at Zone-K (SA-32) As Highlighted"
"Inspection of Formwork for the Wall of Seating Area (3) at Zone-K (SA-32) As Highlighted"
Inspection for Casting the Blinding Concrete under Beam of Seating Area (1) at Zone-G (SA-10) As Highl
Soil Preperation prior to start backfilling sub-base under beam of Seating Area (3) at Zone-K (SA-28) - A
Soil Preperation prior to start backfilling sub-base under beam of Seating Area (2) at Zone-L (SA-37) - As
Level and Location for wall at tunnel 2 (1st) zone 2F (as highlighted)
Level and Location for PILCAP 88 zone 1P
Shuttering for Tunnel 2 Wall (1st) Zone 2F (as highlighted)
Shuttering for Pilecap 88 Zone 1P
Steel Reinforcement for Pilecap 88 Zone 1P
Surface preparation prior to start Water proofing for PC 117, 118, 119, 120, 121, 122 & 124 Zone 2E
Inspection of Internal Plastering Inside General Dining # GF-5044, at Grid between (6-8'9/H-Q), as hig
Level and Location for PILCAP 84 & 86 zone 1P
Level and Location for PILCAP 27 & 29 zone 1E
Shuttering for Pilecap 84 & 86 Zone 1P
Steel Reinforcement for Pilecap 84 & 86 Zone 1P
Concreting for Pilecap 27 & 29 Zone 1E
Shuttering for Pilecap 27 & 29 Zone 1E
Steel Reinforcement for Pilecap 27 & 29 Zone 1E
Surface Preparation prior to waterproofing for Boundary wall Foundation (Inner Faces) of Span 40, 4
Geo-Textile on Blinding's Under Footings (21 no's) at Back of House inside Aviary garden, At Highlight
Single layer 4mm thk Modified Bituminous Water Proofing Membrane on Blinding's Under Footings (21
Single layer 4mm thk Modified Bituminous Water Proofing Membrane for Boundary wall Foundation (
Single layer 4mm thk Modified Bituminous Water Proofing Membrane for Boundary wall Foundation (I
Solvent Base Primer Coating prior to waterproofing for Boundary wall Foundation (Outer Faces) of S
Solvent Base Primer Coating prior to waterproofing for Boundary wall Foundation (Inner Faces) of S
Concrete Pouring for Blinding's Under Footings (21 no's) at Back of House inside Aviary garden, At Hi
Inspection for Casting the Blinding Concrete under the Foundation of Seating Area (2) at Zone-G (SA-39)
Excavation for Foul Water Line from FW-A-13-5 to FW-A-13-4 prior to start Gravel Bedding (as Highlight
Excavation for Storm Water Line from G-A-05 to Main Line prior to start Gravel Bedding (as Highlighted)
Inspection of Concrete Pouring for the Foundation of Seating Area (2) at Zone-K (SA-31) As Highlighted
"Inspection of Formwork for the Foundation of Seating Area (2) at Zone-K (SA-31) As Highlighted"
Inspection of Steel Reinforcement for the Foundation and Wall of Seating Area (2) at Zone-K (SA-31) As
Pipe Installation of Storm Water Line for (315mmØ-UPVC- CLASS 4) 17 m Length. INSIDE MANAGEMEN
Installation of UPVC straight conduit (Dia.25mm) and Box for Fire Alarm (Fire Alarm Flashing Beacon)
Level and Location for BUTTRESS BII 115 (1 mtr from bottom of ring beam) as highlighted zone 2N
Level and Location for Excavation of strip footing between PC 2-4-6-8 at zone 1A (as highlighted)
Level and Location for PILCAP 126, 128, 130, 132 zone 2F
Level and Location for Blinding for strip footing between PC 175 - 177 Zone 2N
Concreting for BUTTRESS BII 115 (1 mtr. from bottom of ring beam) as highlighted
Shuttering for BUTTRESS BII 115 (1 mtr. from bottom of ring beam) as highlighted
Shuttering for PILECAP 126, 128, 130, 132 at Zone 2F
Concreting of Blinding of strip footing between PC 175 - 177 at Zone 2N
Anti termite under Blinding of strip footing between PC 175 - 177 at Zone 2N
Shuttering for Blinding of strip footing between PC 175 - 177 at Zone 2N
Coordinates & Levels of Kicker (2nd lift) of Whispering Cave 1 & 2, @ Sound & Light Garden, At highli
Concrete pouring & Shuttering for Kicker (2nd lift) of Whispering Cave 1 & 2, @ Sound & Light Garden
Coordinates & Levels of Wall for Light wall (D) at Sound & Light Garden, At highlighted area in attach
Concrete pouring & Shuttering for Wall of Light wall (D) at Sound & Light Garden, At highlighted area
Steel Reinforcement for Kicker 2nd Lift of Whispering Cave 2, @ Sound & Light Garden, At highlighte
Concrete pouring & Shuttering of Walls for Seat wall (B, D, E & F) at Sound & Light Garden, At highlig
Coordinates & Levels of Walls for Seat wall (B, D, E & F) at Sound & Light Garden, At highlighted area
Concrete pouring for Blinding under Foundation of Outer Canopy 1 & 3 at Physic Garden, as per highl
Coordinates and levels of Blinding for Foundation of Outer Canopy 1 & 3 at Physic Garden, as per hig
Soil Preparation for Foundation Base of Outer Canopy 1 & 3 at Physic Garden, as per highlighted area
Installation of UPVC straight conduit (Dia.25mm) and Box for Voice and Data (Data & Tel.) at the Ma
Level and Location for BUTTRESS BII 108, 109, 110 ZONE 2M
Level and Location for BUTTRESS BOI BOV 64 (1st) Zone 2B
"Inspection for Casting the Blinding Concrete under the Manhole (G-B-10 & G-B-11) (as Highlighted)"
Level and Location for BUTTRESS BII 123 Zone 2Q
Inspection of Concrete Pouring for the Foundation of Seating Area (3) at Zone-K (SA-33) As Highlighted
Level and Location for BUTTRESS BII 124 & 125 Zone 2Q
"Inspection of Formwork for the Foundation of Seating Area (3) at Zone-K (SA-33) As Highlighted"
Level and Location for PILCAP 28 & 30 zone 1E
Inspection of Steel Reinforcement for the Foundation and Wall of Seating Area (3) at Zone-K (SA-33) As
Inspection for Casting the Blinding Concrete under the Foundation of Seating Area (1) at Zone-L (SA-15)
Level and Location for RC Strip Footing Between PC 110 - 112 Zone 2D
Inspection for Casting the Blinding Concrete under Beam of Seating Area (1) at Zone-G (SA-13) As Highl
Concreting for BUTTRESS BII 108, 109, 110 Zone 2M
Inspection of Concrete Pouring for the Foundation of Seating Area (3) at Zone-K (SA-36) As Highlighted
Concreting for BUTTRESS BIV 65 (2ND) Zone 2B
"Inspection of Formwork for the Foundation of Seating Area (3) at Zone-K (SA-36) As Highlighted"
Inspection of Steel Reinforcement for the Foundation and Wall of Seating Area (3) at Zone-K (SA-36) As
Concreting for BUTTRESS BOI BOV 64 (1st) Zone 2B
Shuttering for BUTTRESS BOI BOV 64 (1st) Zone 2B
Concreting for BUTTRESS BII 123 (2nd) Zone 2Q
Shuttering for BUTTRESS BII 123 (2nd) Zone 2Q
Concreting for BUTTRESS BII 124 & 125 (2nd) Zone 2Q
Shuttering for BUTTRESS BII 124 & 125 (2nd) Zone 2Q
Protection layer of 4mm thick bituminous protection board for Foundation of Strip Footing Zone 2Q (
Concreting of BII 120 & 121 (2nd) (as Highlighted) Zone 2Q & 2P
Concreting for Strip footing at zone 2D Between PC 112-114-116-118 (as highlighted)
Concreting for Buttress BII 122 (2nd) zone 2Q
Concreting for Pilecap 28 & 30 Zone 1E
Shuttering for Pilecap 28 & 30 Zone 1E
Steel Reinforcement for Pilecap 28 & 30 Zone 1E
Concreting for Strip footing between PC 110-112 zone 2D
Shuttering for Strip footing between PC 110-112 zone 2D
Steel Reinforcement for Strip footing between PC 110-112 zone 2D
Single layer of 4mm thk modified bituminous WP membrane for Strip Footing at zone 2D Between PC 10
Inspection of Internal Plastering Inside Private Dining (VIP) # GF-5032, at Grid between (8'9-10/H-N),
Solvent Base Primer Coating prior to Membrane Water proofing on Blinding's Under Footings (21 no's)
Surface Preparation prior to Water proofing on Blinding's Under Footings (21 no's) at Back of House i
Inspection of External Plastering at Grid (18/B-F) & (F/18-20) at Management Building, as highlighted
Excavation & Soil preparation for Plant Encloser room at Discovery Garden at highlighted area in att
Gravel & Geotextile for Sub Surface Branch Drain Pipe (Branch pipes 110mm) along Boundary wall inne
Pipe installation of perforated upvc pipes 110mm dia for sub surface drainage system in PHYSIC GARD
Installation of stub-up UPVC conduit (Dia. 25mm: 2Pcs each Speaker ) for Fire Alarm at the Sound and
Installation of stub-up UPVC conduit (Dia. 25mm: 2Pcs each CAM ) for Security at the Sound and Light
Installation of stub-up UPVC conduit (Dia. 25mm: 2Pcs each WIFI,CAM,E-Ticket,Data Outlet &TELECOM )
INSPECTION OF CASTING CONCRETE FOR SHORT PIECE FOR FOUL WATER LINE, MANHOLE - FW15 & FW16
"Soil Preparation prior to start backfilling for Seating Area (2) (SA-39) - As Highlighted"
Steel Reinforcement for PILECAP 126, 128, 130, 132 at Zone 2F
Surface Preparation and Solvent Base Primer application for RC Strip Footing at Zone 2D Between PC 1
Concreting for BUTRESS BIV 111 & 112 Zone 2M
Concreting for ETFE Foundation (Mock Up).
Steel Reinforcement for Kicker 2nd Lift of Whispering Cave 1, @ Sound & Light Garden, At highlighte
Concreting for BUTRESS BII-BIV 124 & 125 (1st) Zone 2Q
Concreting for BUTRESS BIV 124 & 125 (2ND) Zone 2Q
Concreting for BUTRESS BIV 108 Zone 2M
Concreting for BUTRESS BIV 109 Zone 2M
Concreting for BUTRESS BIV 110 Zone 2M
Concreting for BUTRESS BII-BIV 65 (1st) Zone 2B
Concreting of blinding for MCPE 1 (embossed) zone 2M (as highlighted)
Concreting of blinding for MCPE 1 zone 2M (as highlighted)
Concreting for Strip Footing at Zone 1A TIP
Shuttering for Strip Footing at Zone 1A TIP
INSPECTION OF CASTING CONCRETE FOR SHORT PIECE FOR FOUL WATER LINE, MANHOLE - FW1-3 (As Hig
"Inspection for Casting the Blinding Concrete under the Manhole (MH-B-01) (as Highlighted)"
"Excavation and Surface Preparation prior to Start Blinding For Manhole (MH-B-01) - as Highlighted"
Inspection for Casting the Blinding Concrete under the Manhole for FW-A-20, FW-A-21, FW-A-22, FW-A
Inspection for Casting the Blinding Concrete under Beam of Seating Area (1) at Zone-G (SA-12) As Highl
"Inspection of Concrete Pouring for the Wall of Seating Area (3) at Zone-K (SA-26) As Highlighted"
"Inspection of Formwork for the Wall of Seating Area (3) at Zone-K (SA-26) As Highlighted"
Inspection for backfilling 3/8 Gravel around the Manhole for (MH-A-06, MH-A-09) - as Highlighted (STOC
Soil Preperation Prior to Start Backfill Gravel for Manhole MH-A-06 and MH-A-07 (As Highlighted)
Concrete pouring & Shuttering for Kickers of Light wall (D) at Sound & Light Garden, At highlighted ar
Concrete pouring & Shuttering for Footings of Seat wall (B, D, E & F) at Sound & Light Garden, At high
Coordinates & Levels of Blinding's Under Footings (21 no's) at Back of House inside Aviary garden, At
Inspection of Plaster Guide Points and Plaster Accessories prior to start Spatter Dash (Rough Coat) for
Stone Cladding for Boundary wall (Inner Face) @ Grid (EXC4-10 to EXC4-02 to EXC1-04) at Physic Gard
Stone Cladding for Boundary wall (Inner Face) @ Span 26 of Water Garden, at Highlighted area in At
Stone Cladding for Boundary wall (Outer Face) @ Span 26 & 27 of Water Garden, at Highlighted area
Aluminium Flashing & Sealant for water proofing on Foundation of Boundary wall (Outer Faces) of Sp
Slated layer 4mm thk Modified Bituminous water proofing membrane for Foundation of Boundary wall
Steel Reinforcement for Strip Footing at Zone 1A TIP
Concreting for BOI 111 & 112 for Zone 2M (as Highlighted)
Shuttering for BOI 111 & 112 for Zone 2M (as Highlighted)
Steel Reinforcement for BOV-BOI 111 & 112 for Zone 2M (as Highlighted)
Concreting for BUTTRESS BOI BOV - 122 (1st) Zone 2Q
Shuttering for BUTTRESS BOI BOV - 122 (1st) Zone 2Q
Concreting for MCPE 3 WALL at AXIS 03-A as highlighted at zone 2E
Shuttering for MCPE 3 WALL at AXIS 03-A as highlighted at zone 2E
Level and Location for BUTTRESS BOI - 111 & 112 ZONE 2M
Level and Location for BUTTRESS BOI BOV- 122 (1st) Zone 2Q
Level and Location for RC Strip Footing at TIP Zone 1A
Level and Location for WALL of MCPE 3 Zone 2E Axis 03-1 (as Highlighted)
'Pipe Installation of Storm Water Line for (315mmØ-UPVC- CLASS 4) 17 m Length. INSIDE MANAGEMEN
'Pipe Installation of Foul Water Line for (110mmØ-UPVC- CLASS 4) 28 m Length. INSIDE MANAGEMENT
Installation of UPVC straight conduit (Dia.25mm) and Box for Voice and Data (Camera & Data) at the
Warning Tape Installation for Foul Water Line for (160mmØ-UPVC- Class 4) 42 m Length from (FW1-3
Warning Tape Installation for Foul Water Line for (160mmØ-UPVC- Class 4) 63 m Length from (FW11
Warning Tape Installation for Foul Water Line for (250mmØ-UPVC- Class 4) 69 m Length from (FW
Warning Tape Installation for Storm Water Line- Outfall X for (450mmØ-UPVC- Class 4) 60m Length fr
Warning Tape Installation for Storm Water Line - Outfall A for (600mmØ-PP- Corrugated) 78m Length
300 mm GRAVEL Backfilling above Storm Water Line- Outfall X for (450mmØ-UPVC- Class 4) 60m Length
300 mm GRAVEL Backfilling above Storm Water Line - Outfall A for (600mmØ-PP- Corrugated) 78m Le
Installation of UPVC straight conduit (Dia.25mm) and Box for Fire Alarm (Speaker) at the Maintenanc
Installation of UPVC straight conduit (Dia.25mm) and Box for Video and Data (WIFI) at the Maintenan
Concreting for Buttress BOV 106 & 107 Zone 2L & 2M.
Concreting for Buttress BIV 106 & 107 Zone 2L & 2M
Installation of Anchor M27 gr. 8.8 L=580 and Base Plate for Mock-up of ETFE
Installation of UPVC straight conduit (Dia.25mm) and Box for Video and Data (CCTV&WIFI) at the Ma
Installation of UPVC straight conduit (Dia.25mm 1Pc.each ) and Box for Security (CCTV) at the Main
INSPECTION FOR BACKFILLING GRAVEL (3/8) AROUND THE MANHOLES FOR - FW9, FW10, FW11 (As Highl
Soil Preperation Prior to Start Backfill Gravel for Manhole FW9, FW10, FW11 -as Highlighted
"Inspection of Concrete Pouring for the Wall of Seating Area (3) at Zone-K (SA-30) As Highlighted"
"Inspection of Formwork for the Wall of Seating Area (3) at Zone-K (SA-30) As Highlighted"
Concrete Pouring for Blinding's Under Footings (21 no's) at Back of House inside Aviary garden, At Hi
Inspection of Spatter Dash (Rough Coat) prior to Internal Plastering Inside General Dining # GF-5044,
Sealant filling for New Conctrol Joints (07 no's) on Parapet wall (External side) at Grid (3/A-E), (3/R
Applying Crack filler to Cracks for repair (34 No's) on Parapet wall (External side) at Grid (3/A-E), (3
Protection layer 4mm thk Bituminous protection board for Boundary wall Foundation (Outer Faces) o
Single layer 4mm thk Modified Bituminous Water Proofing Membrane for Boundary wall Foundation (O
Steel Reinforcement for Kicker 2nd Lift of Whispering Cave 2, @ Sound & Light Garden, At highlighte
Surface Preparation prior to Water proofing for Light wall (A, B, C, E, F, G & H) foundations (All Sid
Surface Preparation prior to Water proofing for Boundary wall foundation (Inner Face) at Elevation "
Surface Preparation Prior to start Backfilling for TIP ZONE 1A as highlighted
Surface Preparation Prior to start Backfilling for TUNNEL 1 (near axis 02-1) as highlighted
Level and Location for MCPE 1 (embossed) Blinding under Foundation Zone 2M
Level and Location for MCPE 1 Blinding under Foundation Zone 2M
Level and Location for PILECAP 19 and 26 zone 1C and 1D
Steel Reinforcement for BUTTRESS BOI-BOV 124 & 125 at Zone 2Q
SHuttering of Buttress BII 108, 109, 110 Zone 2M
SHuttering of (embossed) blinding of MCPE 1 zone 2M
Anti termite under blinding of MCPE 1 zone 2M
Concreting for PILECAP 19 at Zone 1C
SHUTTERING for PILECAP 19 at Zone 1C
Steel Reinforcement for PILECAP 19 at Zone 1C
Concreting for PILECAP 26 at Zone 1D
Shuttering for PILECAP 26 at Zone 1D
Steel Reinforcement for PILECAP 26 at Zone 1D
Installation of UPVC straight conduit (Dia.25mm 1Pc.each ) and Box for Fire Alarm (Speaker) at the
"Soil Preparation prior to start backfilling for Seating Area (2) (SA-39A) - As Highlighted"
"Soil Preparation prior to start backfilling for Seating Area (2) (SA-39) - As Highlighted"
INSPECTION OF CASTING CONCRETE FOR SHORT PIECE FOR FOUL WATER LINE, MANHOLE - FW1-3 (As Hig
"Inspection for Application of Primer (3rd Coat) for Concrete Short Piece (FW-9, FW-10, FW11) (As Highl
"Inspection for Application of Primer (2nd Coat) for Concrete Short Piece (FW-9, FW-10, FW11) (As High
"Inspection for Application of Primer (1st Coat) for Concrete Short Piece (FW-9, FW-10, FW11) (As Highl
"Inspection of Concrete Pouring for the Wall of Seating Area (3) at Zone-K (SA-35) As Highlighted"
"Inspection of Concrete Pouring for the Wall of Seating Area (2) at Zone-K (SA-40) As Highlighted"
Surface Preparation prior to Stone Cladding for boundary wall (Inner & Outer face) @ span 48 & 49
Surface Preparation prior to Stone Cladding for boundary wall (Outer face) @ span 45 & 46 @ Water
Excavation & Bed preparation for Sub Surface Branch Drain Pipe (Branch pipes 110mm) along Boundary
Chipping of Additional concrete from the Plaster level on Parapet wall (External side) at Grid (3/A-E)
Openning of New Conctrol Joints (07 no's) on Parapet wall (External side) at Grid (3/A-E), (3/R-X) &
Openning of Cracks for repair (41 No's) on Parapet wall (External side) at Grid (3/A-E), (3/R-X) & (X/
Inspection of Plaster Guide Points and Accessories prior to start Spatter Dash (Rough Coat) for Intern
Inspection of External Plastering at Grid (9/A-B) & (B/9-18) at Management Building, as highlighted i
Steel Reinforcement for Wall of Light wall (D) at Sound & Light Garden, At highlighted area in attach
Concrete pouring & Shuttering for Footing and Kicker (1st lift @ 874.10) of Whispering Cave 1, @ Sou
Concreting for Pile cap 117, 119, 121, 123 Zone 2E
Concreting for Pile cap 124 Zone 2E
Concreting for Pile cap 120 Zone 2E
Shuttering of Buttress BIV 65 (2nd) zone 2B
Concreting of Buttress BII 64 (2nd) zone 2B
Shuttering of Buttress BII 64 (2nd) zone 2B
Shuttering for ETFE Foundation (Mock Up)
Steel Reinforcement for ETFE Foundation (Mock Up)
Level and Location for BUTTRESS BIV 65 (2nd) Zone 2B
Level and Location for BUTTRESS BII 64 (2nd) Zone 2B
Level & Location of Excavation for strip footing at zone 1C as highlighted between PC 14 - 16
Surface Preparation Prior to start Backfilling for Zone 2P Collonades and PC at axis 02-AW as highlighted
Concreting for Buttress BOI-116 & 117 at Zone 2N & 2P
Shuttering for Buttress BOI-116 & 117 at Zone 2N & 2P
Level and Location of BOV-BIV 106 & 107 ZONE 2L & 2M
Level and Location of Pilecap 118, 120, 122, 124 Zone 2E
Level & Location for BOI- 116& 117 Zone 2N & 2P (as highlighted)
Shuttering for Buttress BOV 106 & 107 Zone 2L & 2M
Shuttering for Buttress BIV 106 & 107 Zone 2L & 2M
Shuttering for Pile cap 118, 120, 122, 124 Zone 2E
Steel Reinforcement for Pile cap 124 Zone 2E
Steel Reinforcement for Pile cap 122 Zone 2E
Steel Reinforcement for Pile cap 120 Zone 2E
Steel Reinforcement for Pile cap 118 Zone 2E
Surface Preparation and application of solvent base primer for PC 20, 22, 24 at zone 1C, 1D
Single layer of 4mm thick modified bituminous WP membrane for RC strip footing between PC 106-105
Protection layer of geotextile sheet and 30mm screed under Strip footing between PC 110-112 Zone 2D
Single layer of 4mm thick modified bituminous WP membrane under Strip footing between PC 110-112
INSPECTION FOR CASTING CONCRETE FOR SHORT PIECE OF MH-A-09 AND CONCRETE ENCASEMENT FOR G-
"Inspection of Formwork for the Wall of Seating Area (3) at Zone-K (SA-35) As Highlighted"
SURFACE PREPERATION OF CONCRETE SHORT PIECE FOR MANHOLE (FW9, FW10, FW11) PRIOR TO START
Soil Preperation after Excavation prior to start Backfilling for Seating Area (1) (SA-15) - As Highlighted
Inspection for Casting the Blinding Concrete under the Foundation of Seating Area (2) at Zone-K (SA-33)
Surface Preparation Prior to start Backfilling for Zone 2N beside strip footing between PC 177 - 179 - 18
Solvent base primer coating for Pile Cap at Zone 2N (PC 175 to 182)
Warning Tape Installation for Storm Water Line- Outfall B for (315mmØ-upvc class 4) 4 m Length,
Warning Tape Installation for Storm Water Line- Outfall A for (315mmØ-upvc class 4) 36 m Length, f
Pipe Installation of Storm Water Line- Outfall B for (315mmØ-upvc class 4) 4 m Length, from (MH-B
Installation of UPVC straight conduit (Dia.25mm 1Pc.each ) and Box for Fire Alarm (Speaker) at the
Excavation for Storm Water Line inside Management Building prior to start Gravel Bedding (as Highlight
"Inspection of Formwork for the Wall of Seating Area (2) at Zone-K (SA-40) As Highlighted"
300 mm Gravel 3/8" Backfilling and Geotextile of Foul Water Line for (315mmØ-UPVC- Class 4) 82
Mockup for Floor & Wall Tiles type F3 & W3 (20cm x 20cm Ceramic tiles) with Tile Grout (Vetofill EG4
Surface Preparation prior to Stone Cladding for boundary wall (Outer face) @ span 43 & 44 @ Water
Surface Preparation prior to Stone Cladding for boundary wall (Inner face) @ span 43, 44, 45 & 46 @
Surface Preparation prior to Stone Cladding for boundary wall (Outer face) @ span 40, 41 & 42 @ Wat
Surface Preparation prior to Stone Cladding for boundary wall (Inner face) @ span 40, 41 & 42 @ Wat
Stone Cladding for Boundary wall (Inner Face) @ Span 35 & 36 of Water Garden, at Highlighted area
Stone Cladding for Boundary wall (Inner Face) @ Span 33 & 34 of Water Garden, at Highlighted area
Inspection of Internal Plastering Inside Janitor Closet # GF-5033, at Grid between (9/O-P), as highlig
Concrete pouring & Shuttering for Footing and Kicker 1st Lift @ (874.50) of Whispering Cave 2, @ Sou
Level and Location of ETFE Foundation (Mock Up)
Aluminium Flashing and Sealant for water proofing of Boundary wall Foundation (Outer Face) at Eleva
Aluminium Flashing and Sealant for water proofing of Boundary wall Foundation (Outer Face) at Elev
Level & Location for PILECAP 117, 119, 121, 123 Zone 2E
Steel Reinforcement for BUTTRESS BII-BIV 105 at Zone 2L
Slated layer 4mm thk Modified Bituminous water proofing membrane for Boundary wall Foundation (O
Steel Reinforcement for BUTTRESS BII-BIV 104 at Zone 2L
Steel Reinforcement for BUTTRESS BII-BIV 103 at Zone 2L
Steel Reinforcement for PILECAP 123 Zone 2E
Steel Reinforcement for PILECAP 121 Zone 2E
Steel Reinforcement for PILECAP 119 Zone 2E
Steel Reinforcement for PILECAP 117 Zone 2E
Shuttering for PILECAP 117, 119, 121, 123 Zone 2E
Single layer of 4mm thk modified bituminous WP membrane for RC Strip footing at zone 2C between P
Warning Tape Installation for Foul Water Line for (315mmØ-UPVC- Class 4) 82 m Length from (FW1
Warning Tape Installation for Foul Water Line for (160mmØ-UPVC- Class 4) 27 m Length & (250mmØ-U
300 mm Gravel 3/8" Backfilling and Geotextile of Foul Water Line for (160mmØ-UPVC- Class 4) 27
Warning Tape Installation for Storm Water Line- Outfall X for (450mmØ-UPVC- Class 4) 60m Length f
Warning Tape Installation for Storm Water Line- Outfall A for (800mmØ-PP- Corrugated) 121m Length
300 mm Gravel 3/8" Backfilling and Geotextile of Storm Water Line- Outfall A for (800mmØ-PP- Corru
Warning Tape Installation for Foul Water Line for (160mmØ-UPVC- Class 4) 88m Length from (FW1-2 t
Warning Tape Installation for Storm Water Line- OutFall - A for (800mmØ-PP-Corrugated ) 90m Leng
Warning Tape Installation for Storm Water Line- OutFall - A for (450mmØ-UPVC-Class4 ) 34.5m Leng
Warning Tape Installation for Storm Water Line- Outfall-X for (315mmØ-UPVC- Class 4) 20m Length fr
300 mm Gravel 3/8" Backfilling and Geotextile of Storm Water Line- Outfall-X for (315mmØ-UPVC- Cla
Warning Tape Installation for Storm Water Line- Outfall B for (315mmØ-upvc class 4) 15.5 m Length
Warning Tape Installation for Storm Water Line- Outfall-A for (315mmØ-UPVC- Class 4) 48m Length f
300 mm Gravel 3/8" Backfilling and Geotextile of Storm Water Line- Outfall B for (315mmØ-upvc cla
300 mm Gravel 3/8" Backfilling and Geotextile of Storm Water Line- Outfall-A for (315mmØ-UPVC- Cl
Steel Reinforcement for BUTTRESS BOI-BOV 104 at Zone 2L
Installation of stub-up UPVC conduit (Dia. 25mm - 2pcs. Each CCTV & WIFI) for Voice and Data at Sound
Inspection for Casting the Blinding Concrete under the Foundation of Seating Area (2) at Zone-K (SA-31)
INSPECTION OF CASTING CONCRETE FOR SHORT PIECE FOR FOUL WATER LINE, MANHOLE - FW9, FW10, F
"Inspection of Concrete Pouring for the Wall of Seating Area (1) at Zone-K (SA-16) As Highlighted"
Installation of stub-up UPVC conduit (Dia. 25mm - 2pcs. Each CCTV) for Security at Sound & Light Garde
Installation of stub-up UPVC conduit (Dia. 32mm) for Lighting at Sound and Light Garden as per attache
Installation of earthing clamps with conductor 70mm (1pc.) for earthing reinforcement steel re-bar at
Soil Preparation prior to Backfill along the Boundary Wall (Outer Side) of span 26 of Water Garden, a
Coordinates & Levels for Footing and Kicker (1st lift @ 874.10) of Whispering Cave 1, @ Sound & Ligh
Concrete pouring & Shuttering for Kickers of Light wall (D) at Sound & Light Garden, At highlighted ar
Concrete pouring & Shuttering for Footings of Seat wall (B, D, E & F) at Sound & Light Garden, At high
Steel Reinforcement for BUTTRESS BOI-BOV 104 at Zone 2L
Steel Reinforcement for BUTTRESS BOI-BOV 103 at Zone 2L
Protection layer of 4mm thick bituminous protection board for Pilecap 176, 178, 180, 182 zone 2N
Single layer of 4mm thick modified bituminous WP membrane for Pilecap 176, 178, 180, 182 zone 2N
Shear Connector for BUTRESS BOI BOV 64 Zone 2B
Level & Location for BIV 111 & 112 Zone 2M (as highlighted)
Level & Location for BIV 108, 109, 110 Zone 2M (as highlighted)
Level & Location for BIV 124 & 125 Zone 2Q & 2R (2nd) (as highlighted)
'Pipe Installation of Foul Water Line for (315mmØ-UPVC- Class 4) 82 m Length from (FW15 to FW16
'Bedding of Gravel 3/8" and Geotextile surrounding Foul Water Line for (315mmØ-UPVC- Class 4)
Pipe Installation of Foul Water Line for (160mmØ-UPVC- Class 4) 27 m Length & (250mmØ-UPVC- Clas
'Bedding of Gravel 3/8" and Geotextile surrounding Foul Water Line for (160mmØ-UPVC- Class 4) 27
Installation of UPVC straight conduit (Dia.25mm) and WP Box for Security (Camera) at the Maintenan
Installation of UPVC straight conduit (Dia.25mm 1Pc.each ) and WP Box for Fire Alarm (Speaker) at
Soil Preparation for Foundation Base of Outer Canopy 1 & 3 at Physic Garden, as per highlighted area
Solvent Base Primer Coating prior to waterproofing for Boundary wall Foundation (Inner Faces) of Sp
Solvent Base Primer Coating prior to waterproofing for Boundary wall Foundation (Outer Faces) of S
Inspection of Concrete Pouring for the Foundation of Seating Area (3) at Zone-K (SA-32) As Highlighted
Inspection for Casting the Concrete Encasement for the Storm Water Line from G-A-23 to Main Line an
"Inspection for Application of Primer (3rd Coat) for Concrete Short Piece (G-X-8 AND G-X-9) (As Highligh
"Inspection for Application of Primer (2nd Coat) for Concrete Short Piece (G-X-8 AND G-X-9) (As Highlig
"Inspection for Application of Primer (1st Coat) for Concrete Short Piece (G-X-8 AND G-X-9) (As Highligh
SURFACE PREPERATION OF CONCRETE SHORT PIECE FOR (G-X-8 AND G-X-9) PRIOR TO START WATERPROO
INSPECTION FOR BACKFILLING GRAVEL (3/8) AROUND THE MANHOLE FOR - FW6-1 (As Highlighted) STOC
"Soil Preperation Prior to Start Backfill Gravel for Manhole FW6-1 - as Highlighted"
"Inspection of Formwork for the Wall of Seating Area (1) at Zone-K (SA-16) As Highlighted"
"Inspection of Concrete Pouring for the Wall of Seating Area (3) at Zone-K (SA-27) As Highlighted"
Soil Preperation after Excavation prior to start Backfilling for Seating Area (2) (SA-31) - As Highlighted
"Inspection of Formwork for the Foundation of Seating Area (3) at Zone-K (SA-32) As Highlighted"
Inspection of Steel Reinforcement for the Foundation and Wall of Seating Area (3) at Zone-K (SA-32) As
Surface Preparation prior to Stone Cladding for boundary wall (Outer face) @ span 43 & 44 @ Water
Surface Preparation prior to Stone Cladding for boundary wall (Inner face) @ span 43, 44, 45 & 46 @
Surface Preparation prior to Stone Cladding for boundary wall (Outer face) @ span 40, 41 & 42 @ Wat
Surface Preparation prior to Stone Cladding for boundary wall (Inner face) @ span 40, 41 & 42 @ Wat
Inspection of Spatter Dash (Rough Coat) Prior to Internal Plastering Inside Janitor Closet # GF-5033,
Coordinates & Levels of Blinding's Under Footings (21 no's) at Back of House inside Aviary garden, At
Cast Iron pipe ( 100mm) installation for drainage system at Avaiary Garden (back house) as per high l
Surface Preparation Prior to start Backfilling for Zone 1B beside strip footing between PC 8-10-12-14 (as
Shuttering for ETFE Foundation (Mock Up)
Steel Reinforcement for ETFE Foundation (Mock Up)
Shuttering for BUTRESS BIV 111 & 112 Zone 2M
Shuttering for BUTRESS BIV 110 Zone 2M
Shuttering for BUTRESS BIV 109 Zone 2M
Shuttering for BUTRESS BIV 108 Zone 2M
Shuttering for BUTRESS BIV 124 & 125 (2nd) Zone 2Q
Shear Connector for Buttress BIV-BII 106 and 107 Zone 2M & 2L
Installation of Rock and Boulder No. RB-167 (11&12 Layers)
Concreting for BOV 111 & 112 for Zone 2M & 2N (as Highlighted)
Shuttering for BOV 111 & 112 for Zone 2M & 2N (as Highlighted)
Inspection of Spatter Dash (Rough Coat) prior to External Plastering at Grid (9/A-B), (B/9-18), (18/B-
Steel Reinforcement for Footing & Kicker (1st lift) of Whispering Cave 1, @ Sound & Light Garden, At
"Soil Preperation prior to start Excavation for Seating Area (2) (SA-31) - As Highlighted"
Warning Tape Installation for Foul Water Line for (315mmØ-UPVC- Class 4) 77 m Length (FW-A-16 to F
Inspection for Casting the Blinding Concrete under the Foundation of Seating Area (3) at Zone-K (SA-33)
300 mm Gravel 3/8" Backfilling and Geotextile surrounding Foul Water Line for (315mmØ-UPVC- Class
Soil Preperation prior to start backfilling Sub-Grade for Seating Area (2) (SA-33) - As Highlighted
Warning Tape Installation for Foul Water Line for (160mmØ-UPVC- Class 4) 58 m Length (FW-A-24 to
"Inspection for Application of Primer (3rd Coat) for Concrete Short Piece (FW-6-1, MH-A-06, MH-A-07 )
300 mm Gravel 3/8" Backfilling and Geotextile surrounding Foul Water Line for (160mmØ-UPVC- Class
"Inspection for Application of Primer (2nd Coat) for Concrete Short Piece (FW-6-1, MH-A-06, MH-A-07 )
"Inspection for Application of Primer (1st Coat) for Concrete Short Piece (FW-6-1, MH-A-06, MH-A-07 )
Notification to Start Cut and Removal of Disposal Materials upto -20CM to match the Grading level - as
"SURFACE PREPERATION OF CONCRETE SHORT PIECE FOR (FW6-1, MH-A-06, MH-A-07) PRIOR TO START
Inspection for Casting the Concrete Encasement for the Storm Water Line from G-A-07 to Main Line (as
Inspection for Casting the Concrete Encasement for the Storm Water Line Manhole MH-A-06 and MH-A-
"Inspection of Formwork for the Wall of Seating Area (3) at Zone-K (SA-27) As Highlighted"
"Soil Preperation prior to start Excavation for Seating Area (1) (SA-15) - As Highlighted"
Level & Location of Excavation for strip footing at zone 1B as highlighted between PC 7-9-11-13
Level and Location for BUTTRESS BII-BIV 65 (1st) Zone 2B
Level and Location for BUTTRESS BIV 64 (2nd) Zone 2B
Shuttering for BUTRESS BII-BIV 65 (1st) Zone 2B
Concreting for BUTTRESS BIV 64 (2nd) Zone 2B
Protection layer of geotextile sheet and 50mm screed protection under strip footing between PC 8-10-
Single layer of 4mm thick modified bituminous WP membrane under strip footing between PC 8-10-12-
Shuttering for BUTRESS BIV 64 (2nd) Zone 2B
Installation of stub-up UPVC conduit (Dia. 25mm) for Security (CCTV) at Sound & Light Garden as per at
Installation of stub-up UPVC conduit (Dia. 25mm - 2pcs. Each CCTV & WIFI) for Voice and Data at Sound
Installation of straight UPVC conduit (Dia. 25mm - 2pcs. each CAM) and WP Box for Security (CCTV Sys
Installation of straight UPVC conduit (Dia. 25mm - 2pcs. Each Speaker & Interface Unit) and WP Box fo
Installation of straight UPVC conduit (Dia. 25mm - 2pcs. Each CCTV, WIFI,TEL &32mm- E-Ticket) and WP
Applying Crack filler to Cracks for repair (09 No's) on Parapet wall (External side) at Grid (9/A-B), (
Aluminium Flashing & Sealant for water proofing on Foundation of Boundary wall (Outer Faces) of Sp
Slated layer 4mm thk Modified Bituminous water proofing membrane for Boundary wall Foundation (O
Protection layer 4mm thk Bituminous protection board for Boundary wall Foundation (All Sides) at E
Protection layer 4mm thk Bituminous protection board for Boundary wall Foundation (Outer Face) at
Protection layer 4mm thk Bituminous protection board for Boundary wall Foundation (Outer Face) at
Single layer 4mm thk Modified Bituminous Water Proofing Membrane for Boundary wall Foundation (In
Solvent Base Primer Coating prior to waterproofing for Boundary wall Foundation (Inner Faces) of Sp
Slated layer 4mm thk Modified Bituminous water proofing membrane for Foundation of Boundary wall
Protection layer 4mm thk Bituminous protection board for Foundation of Boundary wall (Outer Faces)
Warning Tape Installation for Foul Water Line for (110mmØ-UPVC- Class 4) 12m Length (AVIARY GAR
300 mm Gravel 3/8" Backfilling and Geotextile surrounding Foul Water Line for (110mmØ-UPVC- Cla
Warning Tape Installation for Foul Water Line for (315mmØ-UPVC- Class 4) 58 m Length (FW-A-17 to F
300 mm Gravel 3/8" Backfilling and Geotextile surrounding Foul Water Line for (315mmØ-UPVC- Class
Warning Tape Installation for Foul Water Line- (315mmØ-upvc class 4) 111 m Length, from (FW-A-2
Warning Tape Installation for Storm Water Line Outfall-A for (400mmØ-UPVC- Class 4) 35 m Length
300 mm Gravel 3/8" Backfilling and Geotextile surrounding Foul Water Line- (315mmØ-upvc class 4
300 mm Gravel 3/8" Backfilling and Geotextile surrounding Storm Water Line Outfall-A for (400mm
Warning Tape Installation for Foul Water Line (315mmØ-UPVC- Class 4) 94 m Length (FW-A-18 to FW-A
Sealant filling for New Conctrol Joints (06 no's) on Parapet wall (External side) at Grid (9/A-B), (B/9
Inspection of Spatter Dash (Rough Coat) Prior to Internal Plastering Inside Private Dining (VIP) # GF-
Inspection of Plaster Guide Points and Plaster Accessories prior to start Spatter Dash (Rough Coat) fo
Soil Preparation prior to Backfill along the Boundary Wall (Outer Side) of span 27 of Water Garden, a
Soil Preparation prior to Backfill along the Boundary Wall (Inner Side) of span 37, 38 & 39 of Water G
INSPECTION OF CASTING CONCRETE FOR SHORT PIECE FOR FOUL WATER LINE, MANHOLE - FW6-1 (As Hig
Inspection for Casting the Concrete Encasement for the Storm Water Line from G-A-02 to Main Line an
Inspection for Casting the Blinding Concrete under the Foundation of Seating Area (3) at Zone-G (SA-31)
Soil Preparation under Boulder No.RB- 308 prior to start cutting.
Surface preparation and solvent base primer under Strip footing at zone 2D Between PC 110 - 112 (as hi
Concreting for Strip footing at zone 2D Between PC 112-114-116-118 (as highlighted)
Shuttering for Strip footing at zone 2D Between PC 112-114-116-118 (as highlighted)
Steel Reinforcement for Strip footing at zone 2D Between PC 112-114-116-118 (as highlighted)
Surface Preparation and solvent base primer for Pile Cap 91 & 92 at Zone 2A
Level and Location for RC Strip footing Between PC 112-114-116 zone 2D
Level and Location for WALL of MCPE 3 Zone 2E Axis 03-1 (as Highlighted)
Level and Location for Foundation of MCPE 2 Zone 2H Axis 02-Z to 03-I (as Highlighted)
Installation of stub-up UPVC conduit (Dia. 32mm 2 pcs. Each Fused Connection Unit Unswitched 230V
Openning of Cracks for repair (20 No's) on Parapet wall (External side) at Grid (9/A-B), (B/9-18) & (1
Openning of New Conctrol Joints (06 no's) on Parapet wall (External side) at Grid (9/A-B), (B/9-18) &
Chipping of Additional concrete from the Plaster level on Parapet wall (External side) at Grid (9/A-B)
Coordinates & Levels for Kicker @ (874.50) of Whispering Cave 2, @ Sound & Light Garden, At highlig
COncreting for MCPE 3 WALL at AXIS 03-A as highlighted at zone 2E
Shuttering for MCPE 3 WALL at AXIS 03-A as highlighted at zone 2E
Concreting for MCPE foundation at AXIS 02-Z to 03-I as highlighted at zone 2G and 2H
Steel Reinforcement for Kicker @ (874.50) of Whispering Cave 2, @ Sound & Light Garden, At highlig
Shuttering for MCPE foundation at AXIS 02-Z to 03-I as highlighted at zone 2G and 2H
Steel Reinforcement for MCPE foundation at AXIS 02-Z to 03-I as highlighted at zone 2G and 2H
Single layer of 4mm thk modified bituminous WP for PC 79, 80, 81, 82 Zone 1N
Surface Preparation and Solvent base primer for PC 79, 80, 81, 82 Zone 1N
Protection layer of geotextile sheet and 50mm screed for tunnel 1 slab (near 02/1) zone 2H
Shuttering of Buttress BII-BIV 120 and 121 (2nd) at Zone 2Q & 2P
Steel Reinforcement for BOV-BOI 111 & 112 for Zone 2M (as Highlighted)
Protection layer of geotextile sheet and 30mm screed protectiond for below PC 141, 142, 143, 144, 14
Installation of stub-up UPVC conduit (Dia. 32mm) for Lighting at Sound and Light Garden as per attache
Installation of earthing clamps with conductor 70mm (1pc.) for earthing reinforcement steel re-bar at
Shear Connector for BUTTRESS BII-BIV 111 & 112 Zone 2M & 2N
Shear Connector for BUTTRESS BII-BIV 110 Zone 2M
Shear Connector for BUTTRESS BII-BIV 109 Zone 2M
Shear Connector for BUTTRESS BII-BIV 108 Zone 2M
Inspection for Casting the Concrete Encasement for the Storm Water Line from Management Building t
Inspection for Casting the Concrete Encasement for the Storm Water Line from G-X-08 to G-X-09 as per
Inspection of Concrete Pouring for the Wall of Seating Area (3) at Zone-K (SA-34) As Highlighted
Cast Iron pipe ( 100mm) installation for drainage system at Avaiary Garden (back house) as per high l
Pipe Installation of Foul Water Line for (110mmØ-UPVC- Class 4) 12m Length (AVIARY GARDEN to F
Bedding of Gravel 3/8" and Geotextile surrounding Foul Water Line for (110mmØ-UPVC- Class 4) 1
Pipe Installation of Foul Water Line for (315mmØ-UPVC- Class 4) 77 m Length (FW-A-16 to FW-A-17).
Bedding of Gravel 3/8" and Geotextile surrounding Foul Water Line for (315mmØ-UPVC- Class 4) 77 m
Pipe Installation of Storm Water Line Outfall-A for (400mmØ-UPVC- Class 4) 35 m Length (MH-A-06
Bedding of Gravel 3/8" and Geotextile surrounding Storm Water Line Outfall-A for (400mmØ-UPVC-
300 mm Gravel 3/8" Backfilling and Geotextile surrounding Foul Water Line for (315mmØ-UPVC- Class
Single layer 4mm thk Modified Bituminous Water Proofing Membrane for Boundary wall Foundation (Al
Single layer 4mm thk Modified Bituminous Water Proofing Membrane for Boundary wall Foundation (O
Single layer 4mm thk Modified Bituminous Water Proofing Membrane for Boundary wall Foundation (O
Surface Preparation prior to waterproofing for Boundary wall Foundation (Inner Faces) of Span 48 &
Surface Preparation prior to waterproofing for Boundary wall Foundation (Outer Faces) of Span 48 &
Single layer 4mm thk Modified Bituminous Water Proofing Membrane for Foundation of Boundary wall
Single layer 4mm thk Modified Bituminous Water Proofing Membrane for Foundation of Boundary wall
Solvent Base Primer Coating prior to waterproofing for Boundary wall Foundation (Outer Faces) of S
Solvent Base Primer Coating prior to waterproofing for Boundary wall Foundation (Outer Faces) of S
Surface Preparation prior to waterproofing for Boundary wall Foundation (Inner Faces) of Span 40, 4
Surface Preparation prior to waterproofing for Boundary wall Foundation (Outer Faces) of Span 40,
Level and Location for BUTTRESS BOI 108, 109 & 110 Zone 2M
Level and Location for BUTTRESS BII-BIV 64 (1st) Zone 2B
Surface Preparation and Solvent base primer for RC strip footing at Zone 2D Between PC 109-111-113
Steel Reinforcement for BUTTRESS BII-BIV 105 at Zone 2L
Steel Reinforcement for BUTTRESS BII-BIV 104 at Zone 2L
Installation of straight UPVC conduit (Dia.32mm 2Pcs. Each F1/CE,L4 ) for Lighting and Box at the Cres
Steel Reinforcement for BUTTRESS BII-BIV 103 at Zone 2L
Installation of straight UPVC conduit (Dia.32mm Socket Outlet) for Power at the Crescent -02 (Axis 02
Concreting of BUTTRESS BOI 110 at zone 2M
Installation of straight UPVC conduit (Dia.32mm 2Pcs. Each F1/CE, F2& Exit) for Lighting and Box at t
Shuttering of BUTTRESS BOI 110 at zone 2M
Installation of straight UPVC conduit (Dia.32mm Socket Outlet) for Power at the Crescent -02 (Axis 0
Concreting of BUTTRESS BOI 109 at zone 2M
Installation of straight UPVC conduit LV Duct (Dia.160mm 6Pcs.-sleeves) for Power and Lighting Circuit
Shuttering of BUTTRESS BOI 109 at zone 2M
Concreting of BUTTRESS BOI 108 at zone 2M
Shuttering of BUTTRESS BOI 108 at zone 2M
Surface Preparation and solvent base primer under strip footing at zone 1B between PC 8-10-12-14
Concreting for Pile cap 24 Zone 1D
Concreting for Pile cap 22 Zone 1D
Concreting for BUTTRESS BII-BIV 64 (1st) Zone 2B
Shuttering for BUTRESS BII-BIV 64 (1st) Zone 2B
Steel reinforcement of Buttress BII-BIV 126 at Zone 2R
Steel Reinforcement of Buttress BOI-BOV 120 and 121 at Zone 2Q & 2P
Excavation for Foul Water Line from FW-A-16 to FW-A-15 including the Manhole FW-A-16, FW-A-15 prior
"Inspection of Formwork for the Wall of Seating Area (3) at Zone-K (SA-34) As Highlighted"
Inspection of Concrete Pouring for the Foundation of Seating Area (3) at Zone-K (SA-26) As Highlighted
Inspection for Casting the Blinding Concrete under the Foundation of Seating Area (3) at Zone-K (SA-32)
Excavation and Surface Preperation prior to start backfilling Sub-Base under Footing of Seating Area (3) (
Excavation for Storm Water Line from MH-A-06 to MH-A-07, prior to start Gravel Bedding (as Highlighte
Inspection for Casting the Blinding Concrete under the Foundation of Seating Area (3) at Zone-K (SA-36)
Shear Connector for Buttress BOI-113 at Zone 2N.
Shear Connector of Buttress BOI-BOV 122 at Zone 2Q.
Shear Connector for Buttress BOI-114 at Zone 2N.
Concreting for 2nd Layer Mass Concrete of Strip Footing at Zone 2D between PC 110-112 as highlight
Installation of straight UPVC conduit (Dia.32mm 2Pcs. Each F1/CE, F2& Exit) for Lighting and Box at th
Installation of straight UPVC conduit (Dia.32mm Socket Outlet) for Power at the Crescent -02 (Axis 02
Inspection of Plaster Guide Points and Accessories prior to start Spatter Dash (Rough Coat) for Intern
Inspection of Internal Plastering Inside Laboratory GF 5027 & Laboratory GF 5031, at Grid (9-10/R-
Inspection of External Plastering at Grid (1/A-R) & (A/1-2) at Management Building, as highlighted in
Steel Reinforcement for Buttress BOI-BOV 106 & 107 Zone 2L & 2M
Steel Reinforcement for Buttress BII-BIV 106 & 107 Zone 2L & 2M
Concreting of blinding for ETFE Foundation (Mock Up)
Shuttering of blinding for ETFE Foundation (Mock Up)
Level and Location of blinding for ETFE Foundation (Mock Up)
Level & Location for Buttress BII 122 (2nd) Zone 2Q
Concreting for Buttress BII 122 (2nd) zone 2Q
Shuttering for Buttress BII 122 (2nd) zone 2Q
Steel Reinforcement for Buttress BII-BIV 66 & 67 zone 2B & 2C
Pipe Installation of Foul Water Line for (315mmØ-UPVC- Class 4) 58 m Length (FW-A-17 to FW-A-18).
Bedding of Gravel 3/8" and Geotextile surrounding Foul Water Line for (315mmØ-UPVC- Class 4) 58 m
Pipe Installation of Foul Water Line for (160mmØ-UPVC- Class 4) 58 m Length (FW-A-24 to FW-A-25).
Level & Location for PILECAP 22 and 24 zone 1D (as highlighted)
Bedding of Gravel 3/8" and Geotextile surrounding Foul Water Line for (160mmØ-UPVC- Class 4) 58 m
Level & Location for PILECAP 20 zone 1C (as highlighted)
Installation of Rock and Boulder No. RB-166 (Layer # 7 & 8)
Installation of Rock and Boulder No. RB-139 (12 &13 Layers)
Installation of Rock and Boulder No. RB-167 (Top Layer)
Installation of Rock and Boulder No. RB-166 (Layer # 3,4,5,6,7)
Installation of Rock and Boulder No. RB-082 (Full Boulder - 4 Layers)
Installation of Rock and Boulder No. RB-061 (Full Boulder - 4 Layers)
Installation of Rock and Boulder No. RB-062 (2nd Layer)
Installation of Rock and Boulder No. RB-060 (3rd Layer)
"Inspection of Formwork for the Foundation of Seating Area (3) at Zone-K (SA-26) As Highlighted"
Inspection of Steel Reinforcement for the Foundation and Wall of Seating Area (3) at Zone-K (SA-26) As
Inspection of Concrete Pouring for the Foundation of Seating Area (3) at Zone-L (SA-38) As Highlighted
Inspection of Concrete Pouring for the Foundation of Seating Area (1) at Zone-K (SA-16) As Highlighted
Soil Preperation prior to start backfilling Sub-Grade for Play Area 1-3 (Inside+outside Area) - As Highligh
Concreting of Buttress BOV 123 (1st) at Zone 2Q
Inspection of Plaster Guide Points and Accessories prior to start Spatter Dash (Rough Coat) for Interna
Soil Preparation prior to Backfill Between Boat Garden and the Boundary Wall span 3 to 11 of Water
Coordinates & Levels for Footing of Whispering Cave 2, @ Sound & Light Garden, At highlighted area
Steel Reinforcement for Footing of Whispering Cave 2, @ Sound & Light Garden, At highlighted area
Stone Cladding for Boundary wall (Inner Face) @ Span 38 of Water Garden, at Highlighted area in At
Shuttering for Pile cap 24 Zone 1D
Steel Reinforcement for Pile cap 24 Zone 1D
Shuttering for Pile cap 22 Zone 1D
Steel Reinforcement for Pile cap 22 Zone 1D
"Excavation and Surface Preperation prior to start Blinding for Manhole FW-A-25, FW-A-24, FW-A-23,
Excavation for Foul Water Line from FW-A-3-6.9 to FW-A-3-6.12 including the Manhole FW-A-3-6.9, FW-
Soil Preperation prior to start backfilling Sub-Grade for Seating Area (3) (SA-33) - As Highlighted
Soil Preperation prior to start backfilling Sub-Grade for Seating Area (3) (SA-32) - As Highlighted
Concreting for Pile cap 20 Zone 1C
"Inspection of Formwork for the Foundation of Seating Area (1) at Zone-K (SA-16) As Highlighted"
"Inspection of Formwork for the Foundation of Seating Area (3) at Zone-L (SA-38) As Highlighted"
Inspection of Steel Reinforcement for the Foundation and Wall of Seating Area (3) at Zone-L (SA-38) As
Shuttering for Pile cap 20 Zone 1C
Steel Reinforcement for Pile cap 20 Zone 1C
Steel Reinforcement for Tunnel 2 Wall (as Highlighted) Zone 2F
Protection layer of Geotextile and 30mm screed under strip footing for zone 2D between PC 112-114-1
Single layer of 4mm thick modified bituminous WP membrane under strip footing for zone 2D between
Single layer of 4mm thick bituminous WP membrane for PC 109 zone 2C
Level & Location for BII 120, 121 Zone 2Q, 2P (2nd) (as highlighted)
Surface Preparation Prior to start Backfilling for Foundation of ETFE Mock-up
Concreting of BII 120 & 121 (2nd) (as Highlighted) Zone 2Q & 2P
Shuttering of BII 120 & 121 (2nd) (as Highlighted) Zone 2Q & 2P
Protection layer of 4mm thk bituminous protectio board for side for tunnel 1 slab (near 02/1) zone 2H
Steel Reinforcement for BIV-BII 111 & 112 for Zone 2M & 2N (as Highlighted)
Steel Reinforcement for BIV-BII 110 for Zone 2M (as Highlighted)
Steel Reinforcement for BIV-BII 109 for Zone 2M (as Highlighted)
Steel Reinforcement for BIV-BII 108 for Zone 2M (as Highlighted)
Surface Preparation and Solvent base primer for RC Strip Footing between PC 103-105-107-109 at Zone
Installation of straight UPVC conduit (Dia.32mm 2Pcs. Each F1/CE, F2& Exit) for Lighting and Box at th
Installation of straight UPVC conduit (Dia.32mm Socket Outlet) for Power at the Crescent -02 (Axis 02
Installation of straight UPVC conduit (Dia.32mm 2Pcs. Each F1/CE & F2) for Lighting (Flood Light) and B
Installation of straight UPVC conduit (Dia.32mm Socket Outlet) for Power at the Crescent -02 (Axis 02
Stone Cladding for Boundary wall (Inner Face) @ Span 6, As per Attached Highlighted Drawing's.
Stone Cladding for Column's of Boundary wall @ Column No. C9 (All Sides), As per Attached Highlight
Stone Cladding for Column's of Boundary wall @ Column No. C8 (All Sides), As per Attached Highlight
Stone Cladding for Column's of Boundary wall @ Column No. C7 (All Sides), As per Attached Highlight
Stone Cladding for Column's of Boundary wall @ Column No. C6 (All Sides), As per Attached Highlight
Stone Cladding for Boundary wall (Inner Face) @ Span 7 & 8, As per Attached Highlighted Drawing's.
Stone Cladding for Column's of Boundary wall @ Column No. C10, C11 & C12 (All Sides), As per Attac
Stone Cladding for Boundary wall (Inner Face) @ Span 15, 16 & 17, As per Attached Highlighted Drawi
Stone Cladding for Boundary wall (Inner Face) @ Span 11 of Water Garden, at Highlighted area in At
Stone Cladding for Boundary wall (Inner Face) @ Span 10 of Water Garden, at Highlighted area in At
Stone Cladding for Boundary wall (Inner Face) @ Span 39 of Water Garden, at Highlighted area in At
Stone Cladding for Boundary wall (Inner Face) @ Span 37 of Water Garden, at Highlighted area in At
Inspection of Spatter Dash (Rough Coat) Prior to Start External Plastering at Grid (1/A-R) & (A/1-2)
Geo-Textile & Protection Screed above Water Proofing for Floor Wet area inside Janitor Closet # GF-
Single layer 4mm thk Modified Bituminous Water Proofing Membrane for Floor Wet area inside Janitor
Geo-Textile for Blinding of Whispering Cave 1 & 2, @ Sound & Light Garden, As per highlighted area
Protection Layer 4mm thk. Bituminous Protection Board for Blinding (Both sides 450mm wide) of Whi
Level & Location for BIV 123 Zone 2Q (2nd) (as highlighted)
Level & Location for BII-BIV 124 & 125 Zone 2Q & 2R (1st) (as highlighted)
Level & Location for 3rd layer mass concerete of Strip footing between PC 110-112 zone 2D
Anti termite under Mass concrete for Strip footing at zone 1B Between PC 8-10-12-14
Concreting of Buttress BIV 123 (2nd) at Zone 2Q
Shuttering of Buttress BIV 123 (2nd) at Zone 2Q
Shuttering of Buttress BII-BIV 124 & 125 at Zone 2Q
Concreting for 3rd layer mass concrete of strip footing at zone 2D between PC 110-112 (as highlighted)
Shuttering for 3rd layer mass concrete of strip footing at zone 2D between PC 110-112 (as highlighted)
Concreting of Mass concrete for Strip footing at zone 1B Between PC 8-10-12-14
Surface Preparation and solvent base primer under strip footing for zone 2D between PC 112-114-116-
Shuttering of Buttress BOV 123 (1st) at Zone 2Q
Surface preparation and solvent base primer application for RC Strip Footing between PC 104-106-108-
Inspection of Steel Reinforcement for the Foundation and Wall of Seating Area (1) at Zone-K (SA-16) As
"Inspection for Application of Primer (3rd Coat) for Concrete Encasement - (G-B-1 to MH-B-04, G-B-2
"Inspection for Application of Primer (2nd Coat) for Concrete Encasement - (G-B-1 to MH-B-04, G-B-2
Excavation for Storm Water Line from MH-A-06 to MH-A-07, prior to start Gravel Bedding (as Highlighte
"Excavation for Foul Water Line from FW12-1 and FW12-2 to Aviary Garden (As Highlighted)"
Level & Location for BOV- 111 & 112 Zone 2M & 2N (as highlighted)
Level & Location for Mock-up of ETFE (as highlighted)
Level & Location for BII-BIV 120, 121 Zone 2Q, 2P (2nd) (as highlighted)
Protection layer of geotextile sheet and 30mm thick screed below Pile Cap 83, 84, 85, 86, 87, 88 at Zone
Surface Preparation and Concrete repair using (renderoc LA extra) for SI-0016 for buttress BIV-BII 122
Steel Reinforcement for Buttress BOV-BOI 67 & 66 at Zone 2C & 2B
Concreting for Buttress BIV 117 at Zone 2P
"Inspection for Application of Primer (1st Coat) for Concrete Encasement - (G-B-1 to MH-B-04, G-B-2
"INSPECTION OF SURFACE PREPERATION FOR CONCRETE ENCASEMENT OF (G-B-1 to MH-B-04, G-B-2 to Main
Inspection for casting the Concrete Encasement for the Storm Water Line from G-B-07 to MH-B-02 as p
Excavation for Storm Water Line from G-A-23 to MH-A-08, G-A-24 to Main Line and G-A-26 to MH-A-09 (
Inspection of Concrete Pouring for the Foundation of Seating Area (3) at Zone-K (SA-27) As Highlighted
Inspection of Concrete Pouring for the Foundation of Seating Area (3) at Zone-K (SA-34) As Highlighted
"Inspection for Casting the Blinding Concrete under the Manhole (FW6-1) - (As Highlighted)"
Excavation and Surface Preperation prior to start Blinding For Manhole (FW6-1) As Highlighted
Pipe Installation of Foul Water Line- (315mmØ-upvc class 4) 111 m Length, from (FW-A-21 to FW-A-
Bedding of Gravel 3/8" and Geotextile surrounding Foul Water Line for (315mmØ-UPVC- Class 4) 111
'Pipe Installation of Foul Water Line- (315mmØ-upvc class 4) 94 m Length, from (FW-A-18 to FW-A-
Bedding of Gravel 3/8" and Geotextile surrounding Foul Water Line for (315mmØ-UPVC- Class 4) 94 M
Surface Preparation prior to Stone Cladding for boundary wall (Inner face) @ span 26 & 27 @ Water G
Soil Preparation prior to Backfill along all the Boundary Wall (Inner Side) of Maze Garden, as per high
Aluminium Flashing & Sealant for Water Proofing of Foundation of Boundary wall (Inner Face) of Spa
Level & Location for Mass Concrete of Strip Footing at zone 1B inner between PC 8-10-12-14 (as highlig
Level & Location for BOI- 116& 117 Zone 2N & 2P (as highlighted)
Shear Connector of Buttress BOI 123 at Zone 2Q
Shuttering for mass concrete of strip footing at zone 1B inner between PC 8-10-12-14 (as highlighted)
Concreting for Buttress BOI-116 & 117 at Zone 2N & 2P
Shuttering for Buttress BOI-116 & 117 at Zone 2N & 2P
Surface Preparation Prior to start Backfilling for Around Collonades Zone 2P (as Highlighted) 02-AW
Level & Location for BOV 110 Zone 2M (as highlighted)
Concreting for BOV 110 for Zone 2M (as Highlighted)
Shuttering for BOV 110 for Zone 2M (as Highlighted)
Level & Location for BOV 109 Zone 2M (as highlighted)
Inspection of Installation of Wall Stone Cladding without Copping for Prayer area at Zone-G (As Highlig
Concreting for BOV 109 for Zone 2M (as Highlighted)
Inspection for backfilling 3/8 Gravel around the Catch Basin and under the pipe for (G-A-06, G-A-10,
Shuttering for BOV 109 for Zone 2M (as Highlighted)
Soil Preperation Prior to Start Backfill Gravel for Catch Basin G-A-6, G-A-10, MH-A-07, MH-A-08, MH-A-
Level & Location for BOV 108 Zone 2M (as highlighted)
Concreting for BOV 108 for Zone 2M (as Highlighted)
Shuttering for BOV 108 for Zone 2M (as Highlighted)
"Inspection of Formwork for the Foundation of Seating Area (3) at Zone-K (SA-34) As Highlighted"
INSPECTION FOR BACKFILLING GRAVEL (3/8) AROUND THE MANHOLES FOR - FW1, FW1-1, FW1-2, FW9-1 (
Protection layer of 4mm thick bituminous protection board for Foundation of Strip Footing Zone 2Q (
Soil Preperation Prior to Start Backfill Gravel for Manhole FW1, FW1-1, FW1-2, FW9-1 -as Highlighted
Single layer of 4mm thick modified bituminous WP membrane for Foundation of Strip Footing Zone 2Q
Inspection of Steel Reinforcement for the Foundation and Wall of Seating Area (3) at Zone-K (SA-34) As
Installation of straight UPVC conduit (Dia. 25mm - 2pcs. each CAM) and WP Box for Security (CCTV Sys
Installation of straight UPVC conduit (Dia. 25mm - 2pcs. Each Speaker & Interface Unit) and WP Box fo
Installation of straight UPVC conduit (Dia. 25mm - 2pcs. Each CCTV, WIFI,TEL &32mm- E-Ticket) and WP
Shuttering and Concreting of Mass concrete for Strip Footing Between PC 168 to 170 (as Highlighted)
Surface Preparation prior to Stone Cladding for boundary wall (Inner face) @ span 28 & 29 @ Water G
Geo-Textile & Protection Screed above Water Proofing for Floor Wet area inside Janitor Closet # GF-
Single layer 4mm thk Modified Bituminous Water Proofing Membrane for Floor Wet area inside Janitor
Soil preparation prior to Backfill Surround for Manhole (MH-C-3-2) @ Aviary garden, At Highlighted i
Protection layer Bitumenous Protection board for Boundary wall foundation (Inner Face) at Elevation
Single layer 4mm thk Modified Bituminous Water Proofing Membrane for Boundary wall Foundation (O
Single layer 4mm thk Modified Bituminous Water Proofing Membrane for Boundary wall Foundation (O
Single layer 4mm thk Modified Bituminous Water Proofing Membrane for Boundary wall Foundation (Al
Single layer 4mm thk Modified Bituminous Water Proofing Membrane for Boundary wall Foundation (O
Single layer 4mm thk Modified Bituminous Water Proofing Membrane for Boundary wall Foundation (O
Surface Preparation prior to waterproofing for Boundary wall Foundation (Inner Faces) of Span 46 of
Surface Preparation prior to waterproofing for Boundary wall Foundation (Inner Faces) of Span 45 of
Surface Preparation prior to waterproofing for Boundary wall Foundation (Inner Faces) of Span 44 of
Surface Preparation prior to waterproofing for Boundary wall Foundation (Inner Faces) of Span 43 of
Surface Preparation prior to waterproofing for Boundary wall Foundation (Outer Faces) of Span 46 o
Surface Preparation prior to waterproofing for Boundary wall Foundation (Outer Faces) of Span 45 o
Surface Preparation prior to waterproofing for Boundary wall Foundation (Outer Faces) of Span 44 o
Surface Preparation prior to waterproofing for Boundary wall Foundation (Outer Faces) of Span 43 o
Aluminium Flashing & Sealant for Water Proofing of Foundation of Boundary wall (Inner Face) of Spa
Slated layer 4mm thk Modified Bituminous Water Proofing Membrane for Foundation of Boundary wall
Aluminium Flashing & Sealant for Water Proofing of Foundation of Boundary wall (Inner Face) of Spa
Slated layer 4mm thk Modified Bituminous Water Proofing Membrane for Foundation of Boundary wall
Aluminium Flashing & Sealant for Water Proofing of Foundation of Boundary wall (Inner Face) of Spa
Slated layer 4mm thk Modified Bituminous Water Proofing Membrane for Foundation of Boundary wall
Slated layer 4mm thk Modified Bituminous Water Proofing Membrane for Foundation of Boundary wall
Protection Layer 4mm thk. Bituminous Protection Board for Foundation of Boundary wall (Inner Face)
Final Coat Cementitious Water Proofing for Boundary wall (Above Kicker) at Elevation "D & E" (Outer
Installation of UPVC straight conduit (Dia.25mm) and WP Box for Security (Camera) at the Maintenan
Installation of UPVC straight conduit (Dia.25mm) and Box for Voice and Data (Camera & Data) at the
Installation of UPVC straight conduit (Dia.25mm) and Box for Fire Alarm (Speaker,Break Glass Unit &
Inspection of Concrete Pouring for the Foundation of Seating Area (2) at Zone-K (SA-40) As Highlighted
"Inspection of Formwork for the Foundation of Seating Area (3) at Zone-K (SA-27) As Highlighted"
Notification to Start Cut and Removal of Disposal Materials upto -75CM from Top of Asphalt - as per t
Inspection for the Installation of Catch Basin (G-A-02, G-X-06) (as Highlighted)
Installation of UPVC conduit (Dia. 32mm) for Power (Socket Outlet) at Crescent -02 (Axis 02/1BA) as pe
Inspection of Steel Reinforcement for the Foundation and Wall of Seating Area (3) at Zone-K (SA-27) As
Installation of UPVC conduit (Dia. 32mm) and Box for Lighting (F1/CE & F2) at Crescent -02 (Axis 02/1BA
"Inspection of Formwork for the Foundation of Seating Area (2) at Zone-K (SA-40) As Highlighted"
Installation of earthing clamps with conductor 70mm (1pc.) for earthing reinforcement steel re-bar at
Installation of earthing clamps with conductor 70mm (1pc.) for earthing reinforcement steel re-bar at C
Installation of Box and UPVC straight conduit (Dia.25mm) for Power (13A Twin Switched Socket Outlet
Shear Connector for Buttress BOI-116 & 117 at Zone 2N & 2P
Level & Location for 2nd layer mass concerete of Strip footing between PC 110-112 zone 2D
Anti termite application for below mass concrete of 2nd layer strip footing at zone 2D between PC 110-1
Shuttering for 2nd layer mass concrete of strip footing at zone 2D between PC 110-112 (as highlighted)
Level & Location for mass concrete of strip footing at zone 2D between PC 114-116-118 (as highlighted)
Steel Reinforcement of Buttress BII-BIV 127 at Zone 2R
Steel Reinforcement of Buttress BOI-BOV 120 and 121 at Zone 2Q & 2P
Concreting of mass concrete of strip footing at zone 2D between PC 114-116-118 (as highlighted)
Shuttering for mass concrete of strip footing at zone 2D between PC 114-116-118 (as highlighted)
Anti termite application for below mass concrete of strip footing at zone 2D between PC 114-116-118 (a
Steel Reinforcement for BIV-BII 111 & 112 for Zone 2M & 2N (as Highlighted)
Steel Reinforcement for BIV-BII 110 for Zone 2M (as Highlighted)
Steel Reinforcement for BIV-BII 109 for Zone 2M (as Highlighted)
Steel Reinforcement for BIV-BII 108 for Zone 2M (as Highlighted)
Protection layer of 4mm thk bituminous protection board for Pile Cap 159, 160, 161, 162, 163, 164, 165
Geo-Textile for Blinding of Whispering Cave 1 & 2, @ Sound & Light Garden, As per highlighted area
Protection Layer 4mm thk. Bituminous Protection Board for Blinding (Both sides 450mm wide) of Whi
Single layer 4mm thk Modified Bituminous Water Proofing Membrane for Blinding (Both sides 450mm
2nd Coat Cementitious Water Proofing for Boundary wall (Above Kicker) at Elevation "D & E" (Outer
Single layer of 4mm thk modified bituminous WP membrane for Strip Footing between PC 103-105-107-
Shuttering And Concreting of Plain Concrete Strip Footing between PC 109, 111, 113 for zone 2D
Steel Reinforcement for BOV-BOI 64 & BB124 for Zone 2B (as Highlighted)
Surface Preparation and Application of Solvent base primer for PC 9, 10, 11, 12 Zone 1B
Protection layer of 4mm thk bituminous protectio board for side for tunnel 1 slab (near 02/1) zone 2H
Protection layer of geotextile sheet and 50mm screed for tunnel 1 slab (near 02/1) zone 2H
Inspection for Casting the Blinding Concrete under the Foundation of Seating Area (3) at Zone-L (SA-38)
Inspection for Casting the Blinding Concrete under the Foundation of Seating Area (3) at Zone-K (SA-26)
"Inspection for Casting the Blinding Concrete under the Manhole (MH-A-06) (as Highlighted)"
Inspection for casting the Concrete Encasement for the Storm Water Line From G-A-06 to Main Line (As
Inspection of Concrete Pouring for the Foundation of Seating Area (3) at Zone-K (SA-35) As Highlighted
"Inspection of Formwork for the Foundation of Seating Area (3) at Zone-K (SA-35) As Highlighted"
Inspection for Casting the Blinding Concrete under the Foundation of Seating Area (3) at Zone-K (SA-36)
"Excavation and Surface Preperation prior to Start Blinding For Manhole (MH-A-06) - as Highlighted"
"Excavation and Surface Preperation for Foul Water Line from FW-A-18 to FW-A-16 prior to start Gravel
Inspection of Concrete Pouring for the Beam of Seating Area (1) at Zone-G (SA-11) As Highlighted
Inspection of Steel Reinforcement for the Foundation and Wall of Seating Area (2) at Zone-K (SA-40) As
Inspection of Concrete Pouring for the Foundation of Seating Area (3) at Zone-K (SA-30) As Highlighted
Installation of straight UPVC conduit (Dia. 32mm) and Box for Power (Socket Outlet ) at Sound & Light
Installation of UPVC conduit (stub-up & straight Dia. 25mm) for Voice and Data (WIFI) at Sound & Ligh
Installation of UPVC conduit (Dia. 75mm) Sleeve for Low Current at the Sound and Light Garden as per
Shuttering of Buttress BIV 122 (2nd) at Zone 2Q
Concreting of Buttress BIV 122 (2nd) at Zone 2Q
Shower MOCK UP installation at Management Buildings as per attached approved materials (IDEAL S
Solvent Base Primer Coating prior to membrane Water Proofing for Blinding (Both sides 450mm wide)
2nd Coat Cementitious Water Proofing for Blinding of Whispering Cave 1 & 2, @ Sound & Light Garden
1st Coat Cementitious Water Proofing for Blinding of Whispering Cave 1 & 2, @ Sound & Light Garden,
2nd Coat Damp proofing for Concrete Encasement of Backdrop & Short piece of Manhole (MH-C-3-2) @
1st Coat Damp proofing for Concrete Encasement of Backdrop & Short piece of Manhole (MH-C-3-2) @
Surface preparation prior to water proofing for Blinding of Whispering Cave 1 & 2, @ Sound & Light G
Inspection of Spatter Dash (Rough Coat) prior to Internal Plastering Inside Laboratory GF 5027 & La
Inspection of Plaster Guide Points and Accessories prior to start Spatter Dash (Rough Coat) for Int
Soil Preparation prior to Backfill along the Boundary Wall (Outer Side) of span 38 & 39 of Water Gard
Soil Preparation prior to Backfill along the Boundary Wall (Outer Side) of span 28 & 29 of Water Gard
1st Coat Cementitious Water Proofing for Boundary wall (Above Kicker) at Elevation "D & E" (Outer
Final Coat Cementitious Water Proofing for Boundary wall (Above Kicker) at Elevation "C" (Outer Face)
INSPECTION FOR BACKFILLING GRAVEL (3/8) AROUND THE MANHOLES FOR - FW6-2, FW6-3 (As Highlight
Inspection for backfilling 3/8 Gravel around the Catch Basin and under the pipe for (G-A-01, G-X-07) - a
Soil Preperation Prior to Start Backfill Gravel for Catch Basin G-A-1 and G-X-7 - as Highlighted
Inspection of Steel Reinforcement for the Foundation and Wall of Seating Area (3) at Zone-K (SA-30) As
Pipe Installation of Storm Water Line- Outfall A for (315mmØ-upvc class 4) 36 m Length, from (MH-A
Bedding of Gravel 3/8" and Geotextile surrounding Foul Water Line for (110mmØ-UPVC- Class 4) from
300 mm Gravel 3/8" Backfilling Above Storm Water Line- Outfall A for (800mmØ-PP- Corrugated) 44m
Installation of straight UPVC conduit (Dia.32mm 2Pcs. Each F1/CE & Exit Light) )for Lighting (Flood Lig
Installation of straight UPVC conduit (Dia.32mm Socket Outlet) for Power at the Crescent -02 (Axis 02
Level & Location for mass concerete of Strip footing between PC 110-112-114 zone 2D
Application of Protection Layer of Geotextile Sheet and 30mm Screed Protection Under Strip Footing TI
Application of Single Layer of 4mm THK Bituminous Water Proofing Under Strip Footing TIP Zone 1A
Steel reinforcement of Buttress BII-BIV 126 at Zone 2R
Steel reinforcement of Buttress BII-BIV 124 & 125 at Zone 2Q
Stone Cladding for Boundary wall (Outer Face) @ Span 11 of Water Garden, at Highlighted area in At
Solvent Base Primer Coat prior to Membrane Water proofing for Boundary wall Foundation (All Sides)
Solvent Base Primer Coat prior to Membrane Water proofing for Boundary wall Foundation (Outer Fac
Solvent Base Primer Coat prior to Membrane Water proofing for Boundary wall Foundation (Outer Fac
Solvent Base Primer Coat prior to Membrane Water proofing for Boundary wall Foundation (Outer Fac
2nd Coat Damp proofing for Boundary wall Top of Kicker (Outer Face) at Elevation "E" @ Sound & Lig
2nd Coat Damp proofing for Boundary wall Top of Kicker (Outer Face) at Elevation "D" @ Sound & Lig
1st Coat Damp proofing for Boundary wall Top of Kicker (Outer Face) at Elevation "E" @ Sound & Lig
1st Coat Damp proofing for Boundary wall Top of Kicker (Outer Face) at Elevation "D" @ Sound & Lig
Base Primer Coating prior to Water Damp proofing for Boundary wall Top of Kicker (Outer Face) at E
Base Primer Coating prior to Water Damp proofing for Boundary wall Top of Kicker (Outer Face) at E
Inspection of Plaster Guide Points and Plaster Accessories prior to start Spatter Dash (Rough Coat) fo
Concrete pouring for Blinding of Whispering Cave 1 & 2, @ Sound & Light Garden, At highlighted area
Coordinates & Levels for Blinding of Whispering Cave 1 & 2, @ Sound & Light Garden, At highlighted
Excavation & Surface Preparation for foundation of Whispering Cave 1 & 2, @ Sound & Light Garden,
Inspection of Internal Plastering (Senior Manager Office, Secretary Office & Meeting room) at Grid
Stone Cladding for Boundary wall (Outer Face) @ Span 29 of Water Garden, at Highlighted area in At
Stone Cladding for Boundary wall (Outer Face) @ Span 28 of Water Garden, at Highlighted area in At
Level & Location of Excavation for strip footing at zone 1B as highlighted between PC 8-10-12-14
Steel Reinforcement for WALL of MCPE 3 zone 2E (as hgihlighted)
Concretingg for mass concrete of strip footing at zone 2D between PC 110-112-114 (as highlighted)
Shuttering for mass concrete of strip footing at zone 2D between PC 110-112-114 (as highlighted)
Anti termite application for below mass concrete of strip footing at zone 2D between PC 110-112-114 (a
Protection layer of 4mm thk bituminous protection board for PC - 4, 6, 8, 10, 12, 13, 14, 15, 16, 17, 18
SIngle layer of 4mm thk modified bituminous WP membrane for PC - 4, 6, 8, 10, 12, 13, 14, 15, 16, 17,
Protection layer of 4mm thk bituminous protection board for under PC 33 to 46 Zone 1F, 1G & 1H
Inspection for casting the Concrete Encasement for the Storm Water Line From G-A-10 to G-A-11 As Hig
Protection layer of geotextile sheet and 30mm screed protection for under PC 33 to 46 Zone 1F, 1G & 1
"Inspection for Casting the Blinding Concrete under the Catch Basin (G-A-02, G-X-6 (as Highlighted)"
Single layer of 4mm thk modified bituminous WP membrane for under PC 33 to 46 Zone 1F, 1G & 1H
"Excavation and Surface Preperation For Catch Basin (G-A-02, G-X-06) - as Highlighted"
Surface Preparation Prior to start Backfilling for Around PC 153 (as Highlighted) Zone 2K
Excavation and Surface Preperation prior to start backfilling Sub-Base under Footing of Seating Area (3)
Excavation and Surface Preperation prior to start backfilling Sub-Base under Footing of Seating Area (3)
"Inspection of Formwork for the Foundation of Seating Area (3) at Zone-K (SA-30) As Highlighted"
"Inspection for Application of Primer 3rd Coat for ( MH-A-7,MH-A-8, MH-A-9, MH-A-13, MH-A-15, MH-X
Inspection for Application of Primer (3rd Coat) for Manhole - FW1, FW1-1, FW9-1 (As Highlighted)
Soil Preperation Prior to Start Backfill Gravel for Manhole FW6-2 and FW6-3 - as Highlighted
"Inspection for Application of Primer 2nd Coat for ( MH-A-7,MH-A-8, MH-A-9, MH-A-13, MH-A-15, MH-X
Inspection for Application of Primer (2nd Coat) for Manhole - FW1, FW1-1, FW9-1 (As Highlighted)
"Inspection for Application of Primer 1st Coat for ( MH-A-7,MH-A-8, MH-A-9, MH-A-13, MH-A-15, MH-X-
Excavation for Foul Water Line from FW-A-25 to FW-A-22 prior to start Gravel Bedding (as Highlighted)
Installation of straight UPVC conduit (Dia. 25mm - 2pcs. each CAM) and WP Box for Security (CCTV Syst
Installation of straight UPVC conduit (Dia. 25mm - 2pcs. Each Speaker & Interface Unit) and WP Box fo
Installation of straight UPVC conduit (Dia. 25mm - 2pcs. Each CCTV, WIFI,TEL &32mm- E-Ticket) and WP
Inspection for Application of Primer (1st Coat) for Manhole - FW1, FW1-1, FW9-1 (As Highlighted)
Inspection for Casting the Blinding Concrete under the Foundation of Seating Area (1) at Zone-K (SA-16)
"Excavation and Surface Preperation for Foul Water Line from FW-A-22 to FW-A-18 prior to start Gravel
Inspection for casting the Concrete Encasement for the Storm Water Line From G-B-07 to G-B-09 As High
"Inspection for the Installation of Catch Basin (G-A-04, G-A-23, G-A-24, G-A-25, G-A-26, G-X-07, G-X-08,
"Inspection for Application of Primer (3rd Coat) for Manhole (FW6-2, FW6-3) As Highlighted"
"Inspection for Application of Primer (2nd Coat) for Manhole (FW6-2, FW6-3) As Highlighted"
"INSPECTION FOR INSTALLATION OF CATCH BASIN AND PIPE CONNECTION FOR (G-B-01, G-B-02, G-B-03, G-B
Level & Location for BOI- 115 Zone 2N (as highlighted)
Level & Location for BOI-BOV 123 Zone 2Q (1st) (as highlighted)
Level & Location for Strip footing between PC 109-111-113 zone 2D
Level & Location for MCPE 2 Foundation at movement joint (axis 03-G and 02-Y as highlighted)
Concreting of RC Strip Footing between PC 109, 111, 113 for zone 2D
Shuttering of RC Strip Footing between PC 109, 111, 113 for zone 2D
Steel reinforcement of RC Strip Footing between PC 109, 111, 113 for zone 2D
Concreting for foundation of MCPE 2 Movement joint @ axis 03-G and 02-Y (as highlighted) Zone 2G
Shuttering for foundation of MCPE 2 Movement joint @ axis 03-G and 02-Y (as highlighted) Zone 2G
Steel reinforcement and Shear Connector for foundation of MCPE 2 Movement joint @ axis 03-G and 02-
Protection layer of 4mm thk bitmuninous protection board for Pile Cap 83, 84, 85, 86, 87, 88 at Zone 1P
Protection layer of 4mm thk bituminous protection Board at MCPE 2 zone 2G to 2K as highlighted side o
Two layer of 4mm thk modified bituminous WP membrane at MCPE 2 zone 2G to 2K as highlighted side
Surface Preparation and solvent base primer application at MCPE 2 zone 2G to 2K as highlighted side of
Shear Connector for Buttress BOI-115 at Zone 2N
Concreting for Buttress BOI-115 at Zone 2N
Shuttering for Buttress BOI-115 at Zone 2N
Concreting of Buttress BII-BIV 120 and 121 (2nd) at Zone 2Q & 2P
Shuttering of Buttress BII-BIV 120 and 121 (2nd) at Zone 2Q & 2P
Protection layer of geotextile sheet and 50mm thick screed rpotection for MCPE 2 Zone 2K (as Highligh
Two layer of 4mm thick modified bituminous WP membrane for MCPE 2 Zone 2K (as Highlighted) Axis 0
Surface Preparation and Application of Solvent base primer for MCPE 2 Zone 2K (as Highlighted) Axis 0
Protection layer of geotextile sheet and screed protection 50mm thk above blinding for MCPE 2 Zone 2J
Primer Coat prior to Water proofing for Concrete Encasement of Backdrop & Short piece of Manhole (
Surface preparation prior to Water proofing for Concrete Encasement of Backdrop & Short piece of M
Concrete Encasement for Backdrop & Short piece of Manhole (MH-C-3-2) @ Aviary garden, At Highligh
Sealant filling for New Conctrol Joints (05 no's) on Parapet wall (External side) at Grid (1/A-R) & (A/
Applying Crack filler to Cracks for repair (15 no's) on Parapet wall (External side) at Grid (1/A-R) &
Installation of UPVC conduit (Dia.110mm-2pcs.) TELECOM Ductbank no.BB/D-TL/58 at the Water Garden
Installation of straight UPVC conduit (Dia. 25mm - 2pcs. each CAM) and WP Box for Security (CCTV Sys
Installation of straight UPVC conduit (Dia. 25mm - 2pcs. Each Speaker & Interface Unit) and WP Box fo
Installation of straight UPVC conduit (Dia. 25mm - 2pcs. Each CCTV, WIFI,TEL &32mm- E-Ticket) and WP
Stone Cladding for Boundary wall (Outer Face) @ Span 38 & 39 of Water Garden, at Highlighted area
Surface Preparation prior to Water proofing for Boundary wall foundation (Outer Face) at Elevation "
2nd Coat Cementitious Water Proofing for Boundary wall (Above Kicker) at Elevation "C" (Outer Face)
Surface preparation prior to Stone Cladding for Boundary wall (Above Kicker) at Elevation "C, D & E"
Concrete pouring & Shuttering of Wall of Span 40, 41 & 42 for boundary wall of Water Garden, as pe
Coordinates & levels of Wall of Span 40, 41 & 42 for boundary wall of Water Garden, as per highligh
Concrete pouring & Shuttering for Column's at Grid (5/3 & 3') (4/A & E) (5/4 & 4') & (5/A, B, C, D & E
Coordinates & levels of Column's at Grid (5/3 & 3') (4/A & E) (5/4 & 4') & (5/A, B, C, D & E) along the
Concrete pouring & Shuttering for Column's at Grid (4/A) (4/2) (1/B,C,& D) (2/E) & (4/F) along the Ret
Coordinates & levels of Column's at Grid (4/A) (4/2) (1/B,C,& D) (2/E) & (4/F) along the Retaining wal
Shuttering and Concreting of Pile Cap (Foundation) 7 (as Highlighted) Zone 1B
Steel Reinforcement of Pile Cap (Foundation) 7 (as Highlighted) Zone 1B
Level & Location of Pile Cap PC 7 & 9 (as Highlighted) Zone 1B
Level & Location For RC Strip Footing at Zone 2C (as Highlighted) Between PC 103-105-107-109
Shuttering and Concreting of Foundation for Tunnel 2 (Zone 2F)
Single layer of 4mm thk modified bituminous WP membrane of Pile cap foundation 167 at zone 2M
Protection Layer of 4mm THK Bituminous Protection Board of Pile cap foundation 167, 168, 169, 170,
Protection Layer of 4mm THK Bituminous Protection Board of Strip Footing Between PC 177-179-181 a
Concreting for Strip Footing between PC 103-105-107-109 at Zone 2C
Shuttering for Strip Footing between PC 103-105-107-109 at Zone 2C
Steel Reinforcement for Strip Footing between PC 103-105-107-109 at Zone 2C
Installation of straight UPVC conduit (Dia. 32mm) and WP Box for Power (Socket Outlet & E-Ticket) at
Inspection of External Plastering at Grid (R/3-6) (Elevation 7) as highlighted in attached Drawing's.
Openning of New Conctrol Joints (05 no's) on Parapet wall (External side) at Grid (1/A-R) & (A/1-2) a
Openning of Cracks for repair (15 no's) on Parapet wall (External side) at Grid (1/A-R) & (A/1-2) at
Chipping of Additional concrete from the Plaster level on Parapet wall (External side) at Grid (1/A-R
1st Coat Cementitious Water Proofing for Boundary wall (Above Kicker) at Elevation "C" (Outer Face) a
Stone Cladding for Boundary wall Inner Face @ Span 9, 11, 12 & 13, As per Attached Highlighted Draw
Stone Cladding for Column's of Boundary wall @ Column No. C10, C11 & C12 (All Sides), As per Attac
Stone Cladding for Column's of Boundary wall @ Column No. C16, C17 & C18 (All Sides), As per Attac
Stone Cladding for Column's of Boundary wall @ Column No. C13, C14 & C15 (All Sides), As per Attac
Aluminium Flashing & Sealant for Water Proofing of Foundation of Boundary wall (Outer Face) of Sp
Slated layer 4mm thk Modified Bituminous Water Proofing Membrane for Foundation of Boundary wall
Protection Layer 4mm thk. Bituminous Protection Board for Foundation of Boundary wall (Outer Face
Stone Cladding for Boundary wall (Outer Face) @ Span 8, 9 & 10 of Water Garden, at Highlighted are
Excavation and Surface Preperation prior to start backfilling Sub-Base under Footing of Seating Area (3)
"Inspection for Application of Primer (1st Coat) for Manhole (FW6-1, FW6-2) As Highlighted"
Inspection for backfilling 3/8 Gravel around the Catch Basin and under the pipe for (G-B-07, G-B-08, G-B-
Surface Preperation prior to start backfilling 3/8 Gravel around the Catch Basin and under the pipe for (
"Inspection for Casting the Blinding Concrete under the Catch Basin (G-A-04, G-A-23, G-A-24, G-A-25, G
"Excavation and Surface Preperation For Catch Basin (G-A-04, G-A-23, G-A-24, G-A-25, G-A-26, G-X-08,
"INSPECTION FOR CASTING CONCRETE FOR SHORT PIECE - G-B-03, G-B-04, G-B-05, G-B-06 (As Highlighte
"INSPECTION OF SURFACE PREPERATION FOR CONCRETE ENCASEMENT OF (MH-A-07, MH-A-08, MH-A-09,
"INSPECTION OF SURFACE PREPERATION FOR CONCRETE ENCASEMENT OF (FW1-1, FW1-1, FW6-1, FW6-2
'Pipe Installation of Storm Water Line- Outfall B for (315mmØ-upvc class 4) 4 m Length, from (MH-
Pipe Installation of Storm Water Line- Outfall B for (315mmØ-upvc class 4) 15.5 m Length, from (G-
Installation of UPVC straight conduit (Dia.25mm 1Pc.each ) and WP Box for Fire Alarm (Speaker) at
'Pipe Installation of (300mmØ-UPVC- CLASS 4) Pipe not Exceeding 2 m & (150mmØ-UPVC- CLASS 4) Pi
Level & Location for BOI- 114 Zone 2N (as highlighted)
Level & Location for BOI- 113 Zone 2N (as highlighted)
Level & Location of Pile Cap PC 95 (as Highlighted) Zone 2A
Surface Preparation and Application of Solvent base primer for PC 4, 6 Zone 1A and PC 8 Zone 1B
Surface Preparation Prior to start Backfilling for Around PC 155 & 157 (as Highlighted) Zone 2K
Concreting of Pile Cap (Foundation) 95 (as Highlighted) Zone 2A
Shuttering of Pile Cap (Foundation) 95 (as Highlighted) Zone 2A
Steel Reinforcement of Pile Cap (Foundation) 95 (as Highlighted) Zone 2A
Single Layer of 4mm thick modified bituminous WP membrane for Pile Cap 83, 84, 85, 86, 87, 88 at Zone
Surface Preparation and Application of Solvent Base Primer for Pile Cap 83, 84, 85, 86, 87, 88 at Zone 1P
Inspection of External Plastering at Grid (6/E-R) & (E/3-6) (Elevation 5 & 6) as highlighted in attached
Inspection of Internal Plastering at Grid (16-18/G-I) & (18-20/F-K) as highlighted in attached Drawing'
Protection Layer of 4mm THK Bituminous Protection Board of Slab at Tunnel 1 Zone 2H (as Highlighted
Shear Connector for Buttress BOI-116 & 117 at Zone 2N & 2P
Concreting for Buttress BOI-114 at Zone 2N
Shuttering for Buttress BOI-114 at Zone 2N
Shear Connector for Buttress BOI-114 at Zone 2N
Concreting for Buttress BOI-113 at Zone 2N
Shuttering for Buttress BOI-113 at Zone 2N
Shear Connector for Buttress BOI-113 at Zone 2N
Steel Reinforcement of Buttress BOI-BOV 116 & 117 at Zone 2N and 2P
Steel Reinforcement for BIV-BII 65 & BB127 for Zone 2B (as Highlighted)
Two layer of 4mm thick modified bituminous WP membrane of Slab at Tunnel 1 Zone 5 (as Highlighted
Shuttering and Concreting of Pile Cap (Foundation) 9 & 11 (as Highlighted) Zone 1B
Installation of earthing clamps with conductor 70mm (2pcs.) for earthing reinforcement steel re-bar a
Installation of earthing clamps with conductor 70mm (2pcS.) for earthing reinforcement steel re-bar
INSPECTION FOR INSTALLATION OF CATCH BASIN AND PIPE CONNECTION FOR -G-A-03, G-A-06, G-A-07, G-
"INSPECTION FOR CASTING CONCRETE FOR SHORT PIECE - MH-B-04, G-B-01, G-B-02 (As Highlighted) "
Inspection of Steel Reinforcement for the Foundation and Wall of Seating Area (3) at Zone-K (SA-35) As
Inspection of Steel Reinforcement for the Foundation and Wall of Seating Area (3) at Zone-K (SA-30) As
Soil Preperation prior to start backfilling Sub-Grade for Seating Area (3) (SA-36) (Inside+outside Area) -
Level & Location of Pile Cap PC 5 (as Highlighted) Zone 1A
INSPECTION FOR MANHOLE BASE INSTALLATION, PIPE CONNECTION AND CASTING CONCRETE FOR SHORT P
Level & Location of Pile Cap PC 93 (as Highlighted) Zone 2A
INSPECTION FOR MANHOLE BASE INSTALLATION, UPVC PIPE CONNECTION AND CASTING CONCRETE FOR S
Shuttering and concreting of Pile Cap (Foundation) 93 (as Highlighted) Zone 2A
Steel Reinforcement of Pile Cap (Foundation) 93 (as Highlighted) Zone 2A
Steel Reinforcement for BOV-BOI 65 & BB124, BB126 for Zone 2B (as Highlighted)
Steel Reinforcement for BOV-BOI 111 & 112 for Zone 2M (as Highlighted)
Steel Reinforcement for BOV-BOI 110 for Zone 2M (as Highlighted)
Steel Reinforcement for BOV-BOI 109 for Zone 2M (as Highlighted)
Steel Reinforcement for BOV-BOI 108 for Zone 2M (as Highlighted)
Steel Reinforcement of BOI-BOV 123 (as Highlighted) Zone 2Q
Protection layer of geotextile sheet and 30mm screed for below Strip footing zone 2D between PC 109
Single layer of 4mm thk modified bituminous WP membrane for below Strip footing zone 2D between
Protection layer of geotextile sheet and 30mm screed protectiond for below PC 141, 142, 143, 144, 14
Single Layer of 4mm thk modified bituminous WP membrane and protection layer of 4mm thk bituminous
Surface Preparation and Application of Solvent base primer for below PC 141, 142, 143, 144, 145, 146,
Concrete pouring of Blinding for Manhole (MH-C-3-2) prior to blinding @ East Side in Aviary garden, A
Steel Reinforcement for Footing & Columns at Grid (5/3 & 3') (4/A & E) (5/4 & 4') & (5/A, B, C, D & E)
Steel Reinforcement for Footing & Columns at Grid (4/A) (4/2) (1/B,C,& D) (2/E) & (4/F) of Columns al
Installation of Manhole (MH-C-3-2) with Backdrop Connection's as per SCR @ Aviary garden, At Highli
Volume dampers Installation at Management Bldg. ; as per high lighted in dwg.
Level & Location for BOV- 115 Zone 2N (as highlighted)
Shuttering and Concreting for Buttress BOV-115 at Zone 2N
Excavation and Surface Preparation Prior to start Backfilling For Telecommunication & (Fire & Scurity)
"Inspection for Casting the Blinding Concrete under the Foundation of Seating Area (3) at Zone-K (SA-3
"Inspection for Casting the Blinding Concrete under the Foundation of Seating Area (3) at Zone-K (SA-2
Excavation and Surface Preperation prior to start backfilling Sub-Base under Footing of Seating Area (2)
Excavation and Surface Preperation prior to start backfilling Sub-Base under Footing of Seating Area (3)
Spatter Dash (Rough Coat) prior to External Plastering of wall at Grid (R/3-6) as highlighted in attach
Spatter Dash (Rough Coat) prior to External Plastering of wall at Grid (6/E-R) as highlighted in attach
Surface Preparation prior to Stone Cladding for boundary wall (Outer face) @ span 26 & 27 @ Water
Surface Preparation prior to Stone Cladding for boundary wall (Inner face) @ span 30, 33, 34 & 35 @
Surface Preparation and Application of Solvent base primer for under PC 33 to 46 Zone 1F, 1G & 1H
Surface Preparation and Application of Solvent base primer for PC 9, 10, 11, 12 Zone 1B
Application of Solvent Base Primer Under Strip Footing TIP Zone 1A
Level & Location for BII- 116 & 117 Zone 2N & 2P (as highlighted)
Notification to Start Road Cutting and Layers Construction for Main Access and VIP Bus Parking at Zone
Surface Preperation prior to start backfilling behind the boundary wall at Zone-3B (Span#23 to Span#38
Inspection for cutting and removal of the disposal material upto the finish level near the New Ticketing
Inspection for casing the Concrete Encasement for the Storm Water Line As per the Highlighted area in
Excavation for Foul Water Line from FW-A-25 to FW-A-22 prior to start Gravel Bedding (as Highlighted)
Installation of straight UPVC conduit (Dia.32mm 1Pc. Media Converter) for Power at the Crescent -02
Installation of straight UPVC conduit (Dia. 25mm) and Box for Fire Alarm (Break Glass) at the Crescent
Installation of straight UPVC conduit (Dia. 25mm - CCTV &32mm-Media Converter) and Box for Voice an
Installation of straight UPVC conduit (Dia. 25mm - CCTV &32mm-Media Converter) and Box for Security
Stone Cladding for Boundary wall (Outer Face) @ Span 37 of Water Garden, at Highlighted area in At
Stone Cladding for Boundary wall (Outer Face) @ Span 36 of Water Garden, at Highlighted area in At
"Inspection for Casting the Blinding Concrete under the Foundation of Seating Area (3) at Zone-K (SA-3
Soil Preparation prior to Backfill along the Boundary Wall (Outer Side) of span 37 of Water Garden, a
"Inspection for Casting the Blinding Concrete under the Foundation of Seating Area (2) at Zone-K (SA-4
1st Coat Cementitious Water Proofing for Boundary wall (Above Kicker) at Elevation "C" (Outer Face) a
Soil Preperation after removing the Disposal Material between the 2 retaining walls as per the Highlig
Protection layer Bitumenous Protection board for Boundary wall foundation (Inner Face) at Elevation
Surface Preparation prior to Water proofing for Boundary wall foundation (Outer Face) at Elevation "
Leak test for Wet area inside Janitor Closet # GF-5033, at Grid between (9/O-P), as highlighted in at
Stone Cladding for Boundary wall (Outer Face) @ Span 35 of Water Garden, at Highlighted area in At
Concrete pouring & Shuttering of Kicker (Outside) of Span 29 for boundary wall of Water Garden, as
Protection layer of geotextile sheet and 30mm screed for Strip Footing between PC 103-105-107-109 at
Steel Reinforcement for BOV-BOI 64 & BB124 for Zone 2B (as Highlighted)
Surface Preparation and Application of Solvent base primer for below Strip footing zone 2D between P
Protection layer of 4mm thk bituminous protection board for PC 153, 154, 155, 157 Zone 2K
Installation of UPVC conduit (Dia.110mm-2pcs.) TELECOM Ductbank no.BB/D-TL/58 at the Water Garden
Level & Location for BII- 114 Zone 2N (as highlighted)
Level & Location of Pile Cap PC 7 & 9 (as Highlighted) Zone 1B
Level & Location of Pile Cap PC 3 & 5 (as Highlighted) Zone 1A
Level & Location for Foundation of Tunnel 2 (as highlighted) zone 2F
Shuttering and Concreting of Pile Cap (Foundation) 7 (as Highlighted) Zone 1B
Steel Reinforcement of Pile Cap (Foundation) 7 (as Highlighted) Zone 1B
Shuttering and Concrerting of Pile Cap (Foundation) 3 & 5 (as Highlighted) Zone 1A
Steel Reinforcement of Pile Cap (Foundation) 3 & 5 (as Highlighted) Zone 1A
Shuttering and Concreting of Foundation for Tunnel 2 (Zone 2F)
Steel Reinforcement of Foundation for Tunnel 2 (Zone 2F)
Fire dampers Installation at Management Bldg. ; as per high lighted in dwg.
Level & Location of Pile Cap PC 94, 96 (as Highlighted) Zone 2A
Shuttering and Concreting of Buttress BII-BIV 120 and 121 (1st) at Zone 2Q & 2P
Excavation and Surface Preperation prior to start backfilling Sub-Base under Footing of Seating Area (3)
Soil Preperation prior to start backfilling Sub-Grade of Seating Area (3) (SA-30) (Inside+outside Area) - A
Excavation for Storm Water Line inside Management Building prior to start Gravel Bedding (as Highlight
Excavation for Storm Water Line from G-A-10 to G-A-11 prior to start Gravel Bedding (as Highlighted)
Steel Reinforcement for Wall of boundary wall at Span 40, 41 & 42 @ Water Garden, as per highligh
Soil Preparation prior to Backfill along the Boundary Wall (Outer Side) of span 36 of Water Garden, a
2nd Coat Bitumenous Damp proofing for Boundary wall foundation (Inner Face) at Elevation "A to B",
1st Coat Bitumenous Damp proofing for Boundary wall foundation (Inner Face) at Elevation "A to B",
Primer Coating prior to Damp proofing for Boundary wall foundation (Inner Face) at Elevation "A to
Base Primer Coating (Water Damp Proof) for Boundary wall Foundation at Elevation "B" (Outer Face)
2nd Coat Damp Proofing for Boundary wall (Kicker top) at Elevation "C" (Outer Face) and Elevation "
1st Coat Damp Proofing for Boundary wall (Kicker top) at Elevation "C" (Outer Face) and Elevation " I
Base Primer Coating (Water Damp Proof) for Boundary wall (Kicker top) at Elevation "C" (Outer Face)
Level & Location for BII-BIV 120, 121 Zone 2Q, 2P (1st) (as highlighted)
Level & Location for BOV- 116 & 117 Zone 2N & 2P (as highlighted)
Shuttering and Concreting of Pile Cap (Foundation) 94 & 96 (as Highlighted) Zone 2A
Steel Reinforcement of Pile Cap (Foundation) 94 & 96 (as Highlighted) Zone 2A
Protection Laywer of 4mm thk bituminous protection board fro TIP 1P
Surface Preparation and Application od Solvent base primer for PC 15, 16, 17, 18 Zone 1C
Surface Preparation and Application od Solvent base primer for PC 13, 14 Zone 1B
Shuttering and Concreting of Buttress BOV-116 & 117 at Zone 2N & 2P
Surface Preparation Prior to start Backfilling for TIP 1P (as Highlighted) Zone 1P
Level & Location For blinding concrete under Strip Footing at Zone 2D (as Highlighted) Between PC 109,
Level & Location For Strip Footing at Zone 2C (as Highlighted) Between PC 104, 106, 108, 110
Level & Location for BII- 113 Zone 2N (as highlighted)
Level & Location for BII-BIV 122 Zone 2Q (2nd) (as highlighted)
Anti Termite Under Plain Concrete Strip Footing between PC 109, 111, 113 for zone 2D
Shuttering And Concreting of Plain Concrete Strip Footing between PC 109, 111, 113 for zone 2D
Single layer of 4mm thk modified bituminous WP membrane for Strip Footing between PC 103-105-107-
Aluminium Flashing & Sealant for Water Proofing of Boundary wall Foundation (Inner Face) @ Span 33
Surface Preparation and Application of Solvent base Primer for Strip Footing between PC 103-105-107-
Slated layer 4mm thk Modified Bituminous Water Proofing Membrane for Boundary wall (Inner Face)
Protection Layer 4mm thk. Bituminous Protection Board for Boundary wall Foundation (Inner Face) @
Shuttering And Concreting of Strip Footing between PC 104, 106, 108, 110 for zone 2C
Single layer 4mm thk Modified Bituminous Water Proofing Membrane for Kicker (Inner Face) of Bound
Steel Reinforcement of Strip Footing between PC 104, 106, 108, 110 for zone 2C
Single layer 4mm thk Modified Bituminous Water Proofing Membrane for Kicker (Inner Face) of Bound
Shuttering and Concreting of Buttress BII-113 at Zone 2N
Single layer 4mm thk Modified Bituminous Water Proofing Membrane for Boundary wall Foundation (I
Single layer 4mm thk Modified Bituminous Water Proofing Membrane for Boundary wall Foundation (O
Two layer of 4mm thk modified bituminous waterproofing membrane above blinding for MCPE 2 Zone 2J
Concrete pouring & Shuttering for Footing's at Grid (5/3 & 3') (4/A & E) (5/4 & 4') & (5/A, B, C, D &
Concrete pouring & Shuttering for Footing's at Grid (4/A) (4/2) (1/B,C,& D) (2/E) & (4/F) under Colum
Concrete pouring & Shuttering for Wall at Span 48 & 49 of boundary wall of Water Garden, as per hi
Base Primer Coating 50% x 50% water and bitumin above blinding for MCPE 2 Zone 2J & 2K (as Highligh
Steel Reinforcement of Pile Cap (Foundation) 153, 154, 155, 157 (as Highlighted) Zone 2K
Coordinates & Levels of Wall at Span 48 & 49 of boundary wall of Water Garden, as per highlighted
Protection layer of 4mm thk bituminous protection board for Pile Cap 159, 160, 161, 162, 163, 164, 165
"INSPECTION FOR MANHOLE BASE INSTALLATION, PIPE CONNECTION AND CASTING CONCRETE FOR SHORT
"INSPECTION FOR INSTALLATION OF RINGS UP TO BOTTOM OF SLAB FOR (MH-X-01) - As Highlighted "
Concrete pouring of Blinding for Manhole (MH-C-3-2) prior to blinding @ East Side in Aviary garden, A
INSPECTION FOR MANHOLE BASE INSTALLATION, PIPE CONNECTION AND CASTING CONCRETE FOR SHORT P
INSPECTION FOR MANHOLE BASE INSTALLATION, PIPE CONNECTION AND CASTING CONCRETE FOR SHORT P
"INSPECTION FOR INSTALLATION OF RINGS UP TO BOTTOM OF SLAB FOR (FW1, FW1-1, FW1-2.1, FW1-2.
Single Layer of 4mm thk modified bituminous WP membrane for Pile Cap 159, 160, 161, 162, 163, 164,
Concreting of Buttress BII-BIV 122 (2nd) at Zone 2Q
"Soil Preperation prior to start backfilling Sub-Grade for Seating Area (1) (SA-16) (Inside+outside Area)
"INSPECTION FOR BACKFILLING GRAVEL (3/8) AROUND THE MANHOLES FOR - FW1-2.3, FW1-3.1, FW1-3.2
Level & Location of Pile Cap PC 9 & 11 (as Highlighted) Zone 1B
Shuttering and Concreting of Pile Cap (Foundation) 9 & 11 (as Highlighted) Zone 1B
Steel Reinforcement of Pile Cap (Foundation) 9 & 11 (as Highlighted) Zone 1B
Installation of UPVC conduit (Dia.110mm-4pcs.) Low Current Ductbank (Data Cables) at the Devonian G
Installation of UPVC conduit (Dia.160mm - 02pcs. Submain Cables & 110mm-2pcs. Lighting & Small Pow
Installation of straight UPVC conduit (Dia.32mm 2Pcs. Each F1 )for Lighting (Flood Light) and Box at t
Installation of earthing clamps with conductor 70mm (1pc.) for earthing reinforcement steel re-bar at
Installation of earthing clamps with conductor 70mm (2pcs.) for earthing reinforcement steel re-bar at
Coordinates & Levels of Blinding for Manhole (MH-C-3-2) prior to blinding @ East Side in Aviary garde
Excavation & Surface Preparation for foundation of Manhole (MH-C-3-2) prior to blinding @ East Side
Stone Cladding for Boundary wall (Outer Face) @ Span 8 & 9 of Water Garden, at Highlighted area in
Spatter Dash (Rough Coat) prior to External Plastering of wall at Grid (E/3-6) as highlighted in attach
Concrete pouring & Shuttering for Wall of Boundary wall (F) at Sound & Light Garden, At highlighted
Coordinates & Levels for Wall of Boundary wall (F) at Sound & Light Garden, At highlighted area in at
Excavation & Surface Preparation for foundation of Whisper Cave 1 & 2, at Sound & Light Garden, At
Soil Preperation prior to start backfilling Sub-Grade of Seating Area (2) (SA-40) (Inside+outside Area) - A
Soil Preperation prior to start backfilling Sub-Grade of Seating Area (3) (SA-27) (Inside+outside Area) - A
Installation of earthing clamps with conductor 70mm (1pc.) for earthing reinforcement steel re-bar
Level & Location of Excavation for strip footing at zone 2D as highlighted along Axis 02-1, 02-J to 02-N
Level & Location of Pile Cap PC 1 & 2 (as Highlighted) Zone 1A
Steel Reinforcement of BOI-BOV 122 (as Highlighted) Zone 2Q
Steel Reinforcement of BOI-BOV 123 (as Highlighted) Zone 2Q
Shuttering and Concreting of Pile Cap (Foundation) 1 & 2 (as Highlighted) Zone 1A
Steel Reinforcement of Pile Cap (Foundation) 1 & 2 (as Highlighted) Zone 1A
Warning Tape Installation for Storm Water Line- Outfall -X for (315mmØ-UPVC- Class 4) Inside Manag
Warning Tape Installation for Foul Water Line for (110mmØ-UPVC- Class 4) from (MB to FW6). At hig
Level & Location of Pile Cap PC 17 (as Highlighted) Zone 1C
Level & Location for BII-BIV 123 Zone 2Q (1st) (as highlighted)
Level & Location of 1 Internal Foundation (as Highlighted) Zone 2C
Two layer of 4mm thick modified bituminous WP membrane of Slab at Tunnel 1 Zone 5 (as Highlighted)
Shear Connector for Buttress BII-113 at Zone 2N
Shuttering and Concreting of Buttress BII-BIV 123 (1st) at Zone 2Q
Inspection of Plaster Guide Points and Plaster Accessories prior to start Spatter Dash (Rough Coat) for
Shuttering and Concreting of 1 foundation Internal Building (as Highlighted) Zone 2C
Surface Preparation prior to Water proofing for Boundary wall foundation (All Sides) at Elevation "
Surface Preparation prior to Water proofing for Boundary wall foundation (Outer Face) at Elevation
Sealant filling for New Conctrol Joints (09 no's) (# 33, 34, 35, 36, 37, 38, 39, 40 & 41) on Parapet wa
Applying Crack filler to Cracks for repair (54 no's) on Parapet wall (External side) at Grid (E&R/3-6
Concrete pouring & Shuttering for Kicker (Inside) of Span 40 & 41 and Kicker (Outside) of span 42 fo
Coordinates & Top levels of Kicker (Inside) of Span 40 & 41 and Kicker (Outside) of span 42 for boun
Shuttering and Concreting of Pile Cap (Foundation) 15, 17 (as Highlighted) Zone 1C
Steel Reinforcement of Pile Cap (Foundation) 15, 17 (as Highlighted) Zone 1C
Aluminium Flashing & Sealant for Water Proofing of Foundation of Boundary wall (Outer Face) of Spa
Slated layer 4mm thk Modified Bituminous Water Proofing Membrane for Foundation of Boundary wall
Soil Preparation prior to Backfill along the Boundary Wall (Outer Side) of span 34 & 35 of Water Gard
Installation of straight UPVC conduit (Dia.32mm 2Pcs. Each F1/CE) for Lighting and Box at the Crescent
Installation of straight UPVC conduit (Dia.32mm 2Pcs. Each Socket Outlet & 2Pcs. Media Converter) for
Installation of earthing clamps with conductor 70mm (1pc.) for earthing reinforcement steel re-bar at C
Concrete Pouring & Shuttering for Walls of Light wall (A, B, C, E, F, G & H) at Sound & Light Garden, A
Primer Coating prior to Water proofing for Boundary wall foundation (Inner Face) at Elevation "B to
Surface Preparation prior to Water proofing for Boundary wall foundation (Inner Face) at Elevation
Coordinates & levels of Footings at Grid (5/3 & 3') (4/A & E) (5/4 & 4') & (5/A, B, C, D & E) for Colum
Coordinates & levels of Footings at Grid (4/A) (4/2) (1/B,C,& D) (2/E) & (4/F) for Columns along the R
Steel Reinforcement for Footing & Columns at Grid (5/3 & 3') (4/A & E) (5/4 & 4') & (5/A, B, C, D & E)
Steel Reinforcement for Footing & Columns at Grid (4/A) (4/2) (1/B,C,& D) (2/E) & (4/F) of Columns al
Mockup for Floor & Wall Tiles type F3 & W3 (15cm x 15cm Ceramic tiles) for All Back of house area's
Solvent Base Primer Coating prior to waterproofing for Boundary wall Foundation (Outer Faces) of S
Solvent Base Primer Coating prior to waterproofing for Boundary wall Kicker (Inner Faces) of Span 2
Solvent Base Primer Coating prior to waterproofing for Boundary wall Foundation (Inner Faces) of Sp
Concrete pouring & Shuttering for Wall of Span 46 for boundary wall of Water Garden, as per highli
Coordinates & Top levels of Wall for Span 46 for boundary wall of Water Garden, as per highlighted
Stone Cladding for Boundary wall (Outer Face) @ Span 34 of Water Garden, at Highlighted area in At
Level & Location for BII- 114 and BOV 114 Zone 2N (as highlighted)
Level & Location of Pile Cap PC 8, 10, 12 (as Highlighted) Zone 1B
Level & Location of Pile Cap PC 4 (as Highlighted) Zone 1A
Level & Location of Pile Cap PC 91, 92 (as Highlighted) Zone 2A
Level & Location For Plain Concrete under Strip Footing at Zone 2M (as Highlighted) Between PC 168 to
Level & Location For Plain Concrete under Strip Footing at Zone 2C (as Highlighted) Between PC 103 to
Steel Reinforcement of Pile Cap (Foundation) 4 (as Highlighted) Zone 1A
Steel Reinforcement of Pile Cap (Foundation) 8, 10, 12 (as Highlighted) Zone 1B
Steel Reinforcement of 1 foundation Internal Building (as Highlighted) Zone 2C
Shear Connector for Buttress BII-114 at Zone 2N
Shuttering and Concreting of Buttress BII-114 at Zone 2N
Shuttering and Concreting of Buttress BOV-114 at Zone 2N
Shuttering and Concreting of Pile Cap (Foundation) 91 & 92 (as Highlighted) Zone 2A
Steel Reinforcement of Pile Cap (Foundation) 91 & 92 (as Highlighted) Zone 2A
"Inspection for Casting the Blinding Concrete under the Manhole (MH-X-03) (as Highlighted)"
Excavation and Surface Preperation For Manhole (MH-X-03) - as Highlighted
Inspection for Casting the Blinding Concrete under the Catch Basin (G-A-01, G-A-03, G-A-06, G-A-07, G-
"Excavation and Surface Preperation For Catch Basin (G-A-01, G-A-03, G-A-06, G-A-07, G-A-08, G-A-09,
INSPECTION FOR APPLICATION OF PRIMER 2nd & 3rd Coat FOR (FW1-2.3, FW1-3.1, FW1-3.2, FW5, FW6,
"Soil Preperation prior to start backfilling Sub-Grade for Seating Area (3) (SA-19) (Inside+outside Area) -
'300 mm Gravel 3/8" Backfilling Above Storm Water Line- Outfall -X for (315mmØ-UPVC- Class 4) Insi
'300 mm Gravel 3/8" Backfilling and Geotextile Above Foul Water Line for (110mmØ-UPVC- Class 4) f
Surface Preparation Prior to start Backfilling for Internal Building (as Highlighted) Zone 2C (2nd part)
Surface Preparation Prior to start Backfilling for Around Pilecaps 159, 161, 163 (as Highlighted) Zone 2L
Shuttering and Concreting of Mass concrete for Strip Footing Between PC 168 to 170 (as Highlighted)
Application of Anti termite under Strip Footing Between PC 168 to 170 (as Highlighted) Zone 2M
Shuttering and Concreting of Strip Footing Between PC 103-105, 107-109 (as Highlighted) Zone 2C
Anti Termite Application below Strip Footing Between PC 103-105, 107-109 (as Highlighted) Zone 2C
Shuttering and Concreting of Duct Bank under Strip Footing at TIP zone 1A
Single Layer of 4mm thk modified bituminous WP membrane for PC 153, 154, 155, 157 Zone 2K
25mm Thick Epoxy Grout (MASTER SEAL 915) for PC 91 - 96 Zone 2A as highlighted
Shuttering of Buttress BII-BIV 122 (1st) at Zone 2Q
Concreting of Buttress BII-BIV 122 (1st) at Zone 2Q
Shuttering and Concreting of Pile Cap (Foundation) 97 & 98 (as Highlighted) Zone 2A
Steel Reinforcement of Pile Cap (Foundation) 97 & 98 (as Highlighted) Zone 2A
Shuttering and Concreting of Pile Cap (Foundation) 6 (as Highlighted) Zone 1A
Steel Reinforcement of Pile Cap (Foundation) 6 (as Highlighted) Zone 1A
Shuttering and Concreting of Buttress BII- 116 & 117 at Zone 2N and 2P
Surface Preparation and Application od Solvent base primer for PC 153, 154, 155, 157 Zone 2K
Steel Reinforcement for BIV-BII 65 & BB127 for Zone 2B (as Highlighted)
Protection layer of geotextile sheet and 30mm screed for Strip Footing between PC 104-106-108-110 at
Single Layer of 4mm thk modified bituminous WP membrane for Strip Footing between PC 104-106-108
Level & Location of Pile Cap PC 97, 98 (as Highlighted) Zone 2A
Level & Location of Pile Cap PC 6 (as Highlighted) Zone 1A
Level & Location of Pile Cap PC 15 (as Highlighted) Zone 1C
Shuttering and Concreting of Pile Cap (Foundation) 8, 10, 12 (as Highlighted) Zone 1B
Shuttering and Concreting of Pile Cap (Foundation) 4 (as Highlighted) Zone 1A
Steel Reinforcement of Buttress BOI-BOV 116 & 117 at Zone 2N and 2P
Openning of New Conctrol Joints (09 no's) (# 33, 34, 35, 36, 37, 38, 39, 40 & 41) on Parapet wall (Ex
Chipping of Additional concrete from the Plaster level on Parapet wall (External side) at Grid (E/4-5)
Openning of Cracks for repair (18 no's) on Parapet wall (External side) at Grid (E&R/3-6 and 6/E-R) a
Steel Reinforcement for Wall at Span 48 & 49 of boundary wall of Water Garden, as per highlighted
Steel Reinforcement for Wall of Boundary wall (F) at Sound & Light Garden, At highlighted area in at
Steel Reinforcement for Walls of Light wall (A, B, C, E, F, G & H) at Sound & Light Garden, At highligh
Steel Reinforcement for Footings & Walls of Seat wall (B, D, E & F) at Sound & Light Garden, At highli
Coodinates & Levels for Walls of Light wall (A, B, E, F & H) at Sound & Light Garden, At highlighted ar
Stone Cladding for Boundary wall (Inner Face) @ Span 25 of Water Garden, at Highlighted area in At
Surface Preparation prior to Stone Cladding for boundary wall (Inner face) @ span 36, 37, 38 & 39 @
INSPECTION FOR MANHOLE BASE INSTALLATION AND UPVC PIPE CONNECTION FOR - FW1-2.3 (As Highlig
"INSPECTION FOR INSTALLATION OF RINGS UP TO BOTTOM OF SLAB FOR (MH-A-07, MH-A-08, MH-A-09)
"INSPECTION FOR MANHOLE BASE INSTALLATION, PIPE CONNECTION AND CASTING CONCRETE FOR SHORT
"INSPECTION FOR INSTALLATION OF RINGS UP TO BOTTOM OF SLAB FOR (MH-X-01) - As Highlighted "
INSPECTION FOR MANHOLE BASE INSTALLATION, PIPE CONNECTION AND CASTING CONCRETE FOR SHORT P
"INSPECTION FOR INSTALLATION OF SLABS FOR (FW1-2.2, FW1-2.3, FW1-3.1, FW1-3.2, FW1-4, FW6-2,
INSPECTION FOR MANHOLE BASE INSTALLATION, PIPE CONNECTION AND CASTING CONCRETE FOR SHORT P
"INSPECTION FOR INSTALLATION OF CATCH BASIN AND PIPE CONNECTION FOR (G-A-01, G-A-02, G-A-03, G-
"INSPECTION FOR INSTALLATION OF RINGS UP TO BOTTOM OF SLAB FOR (FW1, FW1-1, FW1-2.1, FW1-2.
Notification to Start Removal of Disposal Materials between the 2 Retaining walls as per the Highlight
INSPECTION FOR APPLICATION OF PRIMER 1st Coat FOR (FW1-2.3, FW1-3.1, FW1-3.2, FW5, FW6, FW7, FW
INSPECTION FOR MANHOLE BASE INSTALLATION AND UPVC PIPE CONNECTION FOR - FW1-1 (As Highligh
"INSPECTION OF SURFACE PREPERATION FOR CONCRETE ENCASEMENT OF (FW1-2.3, FW1-3.1, FW1-3.2,
"Soil Preperation prior to start backfilling Sub-Grade for Seating Area (1) (SA-14) (Inside+outside Area)
Level & Location of Pile Cap PC 17 (as Highlighted) Zone 1C
Protection layer of 4mm thick bituminous protection board for Pile Cap 103 & 104 at Zone 2C
Solvent base primer application of Slab at Tunnel 1 Zone 5 (as Highlighted) (Near 02/2)
Surface Preparation prior to start Water proofing of Slab at Tunnel 1 Zone 5 (as Highlighted) (Near 02/2)
Shuttering and Concreting of Pile Cap (Foundation) 15, 17 (as Highlighted) Zone 1C
Steel Reinforcement of Pile Cap (Foundation) 15, 17 (as Highlighted) Zone 1C
Steel Reinforcement of Pile Cap (Foundation) 8, 10, 12 (as Highlighted) Zone 1B
Steel Reinforcement of Pile Cap (Foundation) 4 (as Highlighted) Zone 1A
Solvent Base Primer prior to waterproofing membrane for Kicker (Inner Face) of Boundary wall Span
Installation of straight UPVC conduit (Dia. 25mm) and Box for Fire Alarm (Break Glass) at the Crescent-
Installation of straight UPVC conduit (Dia.25mm & 32mm : 2 Pcs. each ) and Box for Voice and Data (
Installation of straight UPVC conduit (Dia. 25mm & 32mm) and Box for Security (CCTV) at the Crescen
Installation of earthing clamps with conductor 70mm (2pcs.) for earthing reinforcement steel re-bar at
Installation of straight UPVC conduit (Dia.32mm 2Pcs. )for Lighting (W14) and Box at the Crescent -02
Surface Preparation prior to Stone Cladding for boundary wall (Outer face) @ span 28 & 29 @ Water
Soil Preparation prior to Backfill along the Boundary Wall (Inner Side) of span 21 of Water Garden, as
Protection Layer 4mm thk. Bituminous Protection Board for Foundation of Boundary wall (Outer Face
Single layer 4mm thk Modified Bituminous Water Proofing Membrane for Foundation of Boundary wall
Concrete pouring & Shuttering of Kicker (Outside) of Span 40 for boundary wall of Water Garden, as
Steel Reinforcement for Wall at Span 48 & 49 of boundary wall of Water Garden, as per highlighted
Steel Reinforcement for Wall at Span 46 of boundary wall of Water Garden, as per highlighted Atta
External Plastering (Render) for Walls at Grid (A/5-7 & 8-9) as highlighted in attached Drawing's.
Mockup for Water proofing (Membrane) with Flood Drain at Wet area inside Janitor Closet # GF-5033,
Steel Reinforcement for Wall of Boundary wall (F) at Sound & Light Garden, At highlighted area in at
Concrete Pouring & Shuttering for Wall of Boundary wall (A) at Sound & Light Garden, At highlighted
Coordinates & Levels for Wall of Boundary wall (A) at Sound & Light Garden, At highlighted area in a
Coedinates & Levels for Walls of Light wall (A, B, C & G) at Sound & Light Garden, At highlighted area
Concrete pouring & Shuttering of Kicker (Outside) of Span 41 and Kicker (Inside) of span 42 for boun
Surface Preparation and Application of Solvent base Primer for Strip Footing between PC 104-106-108-
Single Layer of 4mm thk modified bituminous WP membrane for Pile Cap 103 & 104 at Zone 2C
Protection layer of 4mm thk bituminous protection board for Pile Cap 159, 160, 161, 162, 163, 164, 165
Single Layer of 4mm thk modified bituminous WP membrane for Pile Cap 159, 160, 161, 162, 163, 164,
Geotextile Sheet and 30mm thk Screed for PC-91, 92, 93, 94, 95, 96 (as highlighted) Zone 2A
Protection layer of 4mm thk bituminous protection board for PC-91, 92, 93, 94, 95, 96 (as highlighted)
Single Layer of 4mm thk modified bituminous WP membrane for PC-91, 92, 93, 94, 95, 96 (as highlighte
Concreting of Blinding for MCPE (small area) as highlighted in Zone 2J
Installation of UPVC conduit (Dia.110mm-2pcs.) TELECOM Ductbank no.BB/D-TL/58 at the Water Garden
INSPECTION FOR PUNCHING OF MANHOLES FOR - FW1-2.1, FW1-2.2, FW1-3.1, FW1-3.2, FW1-4, FW6-2,
"INSPECTION FOR BACKFILLING GRAVEL (3/8) AROUND THE MANHOLES FOR - FW1-2.1, FW1-2.2, FW1-4,
Surface Preparation prior to Water proofing for Boundary wall foundation (Inner Face) at Elevation
Protection Screed 50mm on Blinding Under Columns at Grid (5/3 & 3') (4/A & E) (5/4 & 4') & (5/A, B, C
Protection Screed 50mm on Blinding Under Columns at Grid (4/A) (1/B,C,& D) (2/E) & (4/F) along the R
Geo Textile on Blinding Under Columns at Grid (5/3 & 3') (4/A & E) (5/4 & 4') & (5/A, B, C, D & E) alo
Protection Board on Wall Beside Blinding Under Columns at Grid (5/3 & 3') (4/A & E) (5/4 & 4') & (5/A
Geo Textile on Blinding Under Columns at Grid (4/A) (1/B,C,& D) (2/E) & (4/F) along the Retaining wal
Protection Board on Wall Beside Blinding Under Columns at Grid (4/A) (1/B,C,& D) (2/E) & (4/F) along
Solvent Base Primer prior to waterproofing membrane for Foundation of Boundary wall (Outer Face)
Solvent Base Primer prior to waterproofing membrane for Foundation of Boundary wall (Outer Face)
Solvent Base Primer prior to waterproofing membrane for Kicker (Inner Face) of Boundary wall of Sp
Stone Cladding for Boundary wall (Inner Face) @ Span 24 of Water Garden, at Highlighted area in At
Stone Cladding for Boundary wall (Inner Face) @ Span 23 of Water Garden, at Highlighted area in At
Stone Cladding for Boundary wall (Inner Face) @ Span 22 of Water Garden, at Highlighted area in At
Stone Cladding for Boundary wall (Outer Face) @ Span 33 of Water Garden, at Highlighted area in At
Stone Cladding for Boundary wall (Outer Face) @ Span 30 of Water Garden, at Highlighted area in At
Concrete pouring & Shuttering of Wall at Span 43, 44 & 45 for boundary wall of Water Garden, as pe
Coordinates & Top levels of Wall of Span 43, 44 & 45 for boundary wall of Water Garden, as per hig
Anti Termite Application Under Blinding for MCPE (small area) as highlighted in Zone 2J
Protection layer of geotextile sheet and screed protection 50mm thk above blinding for MCPE 2 Zone 2J
Two layer of 4mm thk modified bituminous waterproofing membrane above blinding for MCPE 2 Zone 2J
Base Primer Coating 50% x 50% water and bitumin above blinding for MCPE 2 Zone 2J & 2K (as Highligh
Protection Layer of Geo-textile Sheet and Screed under PC 17, 25 to 32 Zone 1E 1D & 1C (as Highlighted
'Pipe Installation of 110mmØ-upvc class 4 for Foul Water Line. BETWEEN IN 2 BLDG. OF MANAGEMENT
' Bedding of Gravel 3/8" and Geotextile surround in FOUL Water Line- for (110mmØ-UPVC- Class
Surface Preparation prior to waterproofing for Boundary wall Foundation (Outer Faces) of Span 28 o
Surface Preparation prior to waterproofing for Boundary wall Foundation (Outer Faces) of Span 26 &
Surface Preparation prior to waterproofing for Boundary wall Foundation (Inner Faces) of Span 27 of
Surface Preparation prior to waterproofing for Boundary wall Foundation (Inner Faces) of Span 26 of
Single layer 4mm thk Modified Bituminous Water Proofing Membrane for Kicker (Inner Face) of Bound
Single layer 4mm thk Modified Bituminous Water Proofing Membrane for Foundation of Boundary wall
Primer Coat prior to Water proofing for Floor area inside Janitor Closet # GF-5033, at Grid between (
1st layer Bituminous Membrane for Blinding Under Columns at Grid (5/3 & 3') (4/A & E) (5/4 & 4') & (5
1st layer Bituminous Membrane for Blinding Under Columns at Grid (4/A) (1/B,C,& D) (2/E) & (4/F) alo
2nd layer Bituminous Membrane for Blinding Under Columns at Grid (5/3 & 3') (4/A & E) (5/4 & 4') & (5
2nd layer Bituminous Membrane for Blinding Under Columns at Grid (4/A) (1/B,C,& D) (2/E) & (4/F) alo
Coordinates & Top levels of Kicker (Outside) of Span 40 & 41 and Kicker (Inside) of span 42 for boun
Steel Reinforcement for Walls of Light wall (A, B, C, E, F, G & H) at Sound & Light Garden, At highligh
Steel Reinforcement for Wall of Boundary wall (A) at Sound & Light Garden, At highlighted area in at
External Plastering (Render) for Walls at Grid (A/3-5 & 7-8) as highlighted in attached Drawing's.
Level & Location of Excavation for strip footing at zone 2D as highlighted along Axis 02-2, 02-J to 02-L
Protection layer of 4mm thk bitunibous protection board for PC-111, 113, 115 (as highlighted) Zone 2D
Protection Layer of 4mm thk bituminous protectio board for PC-112, 114, 116 (as highlighted) Zone 2D
Single Layer of 4mm thk modified bituminous WP membrane for PC-112, 114 & 116 (as highlighted) Zon
Surface Preparation and Application of Solvent Base Primer for Pile Cap 159, 160, 161, 162, 163, 164, 1
Surface Preparation and Application of Solvent Base Primer for Pile Cap 103 & 104 at Zone 2C
Soil Preperation prior to start backfilling around the Manholes for FW1-2.1, FW1-2.2, FW1-4, FW12,
Soil Preparation prior to Backfill along the Boundary Wall (Outer Side) of span 30 & 33 of Water Gard
"Mock up inspection of Wall Stone Cladding for Prayer Area at Zone-B As Highlighted "
Inpection of Manhole Base Installation, UPVC Pipe Connection and Casting Concrete for Short Piece (F
Excavation & Surface Preparation for foundation of boundary wall @ span 37 & 38 @ Water Garden at
Excavation Limits and Levels for the attached highlighted drawing (Aviary Gardens).
Coordinates for Wall - Ticketing Booth #4
Level & Location for BII-BIV 122 Zone 2Q (1st) (as highlighted)
Level & Location for BII- 116 & 117 Zone 2N & 2P (as highlighted)
Level & Location of Pile Cap PC 13 & 14 (as Highlighted) Zone 1C
Shuttering of Buttress BII-BIV 122 (1st) at Zone 2Q
Shuttering and Concreting of Buttress BII- 116 & 117 at Zone 2N and 2P
Shuttering and Concreting for PC 13 & 14 As Highlighted) Zone 1C
Surface Preparation Prior to start Water proofing and Solvent Base Primer for PC-91, 92, 93, 94, 95, 96
Installation of UPVC conduit (Dia.110mm-2pcs.) Fire & Security Ductbank no.BB/D-FS/12 at the Water
Installation of UPVC conduit (Dia.110mm-4pcs.) TELECOM Ductbank no.BB/D-TL/18 at the Water Garden
Installation of straight UPVC conduit (Dia. 25mm: CCTV) and Box for Security at the Crescent-02 (Axis
Level & Location of Excavation for strip footing at zone 2C as highlighted along Axis 01-2, 02-J to 02-G
Protection layer of 4mm thk bitunibous protection board for PC-106, 107, 108, 109, 110 (as highlighted
Single Layer of 4mm thk Modified bituminous WP membrane for PC-111, 113, 115 (as highlighted) Zone
Surface Preparation Prior to start Water proofing and Solvent Base Primer for PC-112, 114, 116 (as high
Surface Preparation prior to waterproofing for Boundary wall Foundation (Outer Faces) of Span 29 o
Surface Preparation prior to waterproofing for Boundary wall Foundation (Inner Faces) of Span 28 &
Spatter Dash (Rough Coat) prior to External Plastering for Wall at Grid (A/5-9) as highlighted in attac
Warning Tape Installation for Foul Water Line (160mmØ-UPVC-Class 4) 69m Length from (FW1-1 to FW
'Warning Tape Installation for Foul Water Line for (160mmØ-UPVC- Class 4) 33m Length from (FW14 t
Warning Tape Installation of Storm Water Line -Outfull-A for ( 800mmØ - PP- Corrugated) 26m Lengt
'Pipe Installation of Storm Water Line- Outfall A for (800mmØ-PP- Corrugated) 44m Length from (MH-A
' Bedding of Gravel 3/8" and Geotextile surround in Storm Water Line- Outfall X for (315mmØ-UPV
INSPECTION FOR APPLICATION OF PRIMER 3rd Coat (FW1-2.1, FW1-2.2, FW1-4, FW12, FW12-1, FW12-2,
Pipe Installation of Storm Water Line- Outfall X for (315mmØ-upvc class 4) . BETWEEN IN 2 BLDG.
Level & Location of Pile Cap PC 153, 154, 155, 157 (as Highlighted) Zone 2K
Level & Location of Pile Cap PC 104 (as Highlighted) Zone 2C
Solvent Base Primer for Foundation of Strip Footing Zone 2Q (2nd)
Surface Preparation Prior to start Water proofing for Foundation of Strip Footing Zone 2Q (2nd)
Steel Reinforcement for PC 13 & 14 As Highlighted) Zone 1C
Steel Reinforcement of BII-BIV 123 (as Highlighted) Zone 2Q
Surface preparation prior to Water proofing for Floor area inside Janitor Closet # GF-5033, at Grid b
Surface Preparation Prior to start Backfilling for Internal Building (as Highlighted) Zone 2C
Steel Reinforcement for Wall at Span 43, 44 & 45 of boundary wall of Water Garden, as per highligh
Steel Reinforcement of BII-BIV 120 & 121 (as Highlighted) Zone 2Q
Concrete pouring & Shuttering for Kicker (Inside) at Span 48 and Kicker (Outside) at Span 49 of boun
Installation of straight UPVC conduit (Dia. 25mm: 2Pcs each (WIFI) and Box for Voice and Data at the Cr
Installation of straight UPVC conduit (Dia. 25mm) and Box for Fire Alarm (Speaker) at the Crescent-02 (
Installation of straight UPVC conduit (Dia.32mm 2Pcs. Each Socket Outlet) for Power at the Crescent -02
Installation of straight UPVC conduit (Dia.32mm 2Pcs. Each F1/CE & F2 )for Lighting (Flood Light) and
Inpection of Manhole Base Installation, UPVC Pipe Connection and Casting Concrete for Short Piece (FW
INSPECTION FOR APPLICATION OF PRIMER 2nd Coat (FW1-2.1, FW1-2.2, FW1-4, FW12, FW12-1, FW12-2,
Soil Preparation prior to Backfill along the Boundary Wall (Outer Side) of span 18, 19, 20, 21, 22, 23
Protection Board for Pedestal (Column's Surround) (06 no's @ Grids A / 3, 4, 5, 6, 7 & 8) at Ticket B
2nd Coat Damp proofing for Pedestal (Column's Surround) (06 no's @ Grids A / 3, 4, 5, 6, 7 & 8) at T
1st Coat Damp proofing for Pedestal (Column's Surround) (06 no's @ Grids A / 3, 4, 5, 6, 7 & 8) at T
Primer coat Prior to Damp Proofing for Pedestal (Column's Surround) (06 no's @ Grids A / 3, 4, 5, 6,
Protection Layer of 4mm thk. Bitumenous protection board for Foundation of Boundary wall (Inner Fac
Single Layer Water proofing membrane 4mm thk. for Foundation of Boundary wall (Inner Face) @ Grid
Protection Layer of 4mm thk. Bitumenous protection board for Foundation of Boundary wall (Inner Fac
Shuttering and Concreting of Pile Cap 104 at Zone 2C
Inspection of Internal Plastering at Grid between (13-15/F-H) (Meeting Room # GF-5016) as highlight
Steel Reinforcement of Pile Cap 104 at Zone 2C
Steel Reinforcement of Buttress BOI-BOV 116 & 117 at Zone 2N and 2P
Shuttering and Concreting of Pile Cap (Foundation) 153, 154, 155, 157 (as Highlighted) Zone 2K
Steel Reinforcement of Pile Cap (Foundation) 153, 154, 155, 157 (as Highlighted) Zone 2K
Installation of UPVC conduit (Dia. 75mm) Sleeve for Low Current at the Sound and Light Garden as per
Concrete pouring & Shuttering for Kickers of Light wall (A, B, C, D, E, F, G & H) at Sound & Light Gard
Spatter Dash (Rough Coat) prior to Plastering (External) for Wall at Grid (A/3-5) as highlighted in att
Concrete pouring & Shuttering of Wall for Boundary wall (G) at Sound & Light Garden, At highlighted
Coordinates & Levels of Wall for Boundary wall (G) at Sound & Light Garden, At highlighted area in a
Concrete pouring & Shuttering of Walls for Boundary wall (D & E) at Sound & Light Garden, At highlig
Coordinates & Levels of Walls for Boundary wall (D & E) at Sound & Light Garden, At highlighted area
Steel Reinforcement for Footings & Walls of Seat wall (B, D, E & F) at Sound & Light Garden, At highli
Coordinates & Levels for Footings of Seat wall (B, D, E & F) at Sound & Light Garden, At highlighted a
Shuttering and concreting of 3rd layer mass concrete for Strip Footing Between PC 110-108, 108-106 (a
Shuttering and Concreting 1 blinding of foundation Internal Building (as Highlighted) Zone 2C
Level & Location For 3rd Layer Mass/Plain Concrete under Strip Footing at Zone 2C (as Highlighted) Be
Level & Location of Blinding for 1 Internal Foundation (as Highlighted) Zone 2C
Level & Location for BII- 115 Zone 2N (as highlighted)
Level & Location of Pile Cap PC 16 & 18 (as Highlighted) Zone 1C
Solvent base Primer for PC-111, 113 & 115 (as highlighted) Zone 2D
Anti Termite Application below Strip Footing Between PC 110-108, 108-106 (as Highlighted) Zone 2C
Anti Termite Application below 1 blinding of foundation Internal Building (as Highlighted) Zone 2C
Shuttering and Concreting of Pile Cap (Foundation) 16 & 18 (as Highlighted) Zone 1C
Steel Reinforcement of Pile Cap (Foundation) 16 & 18 (as Highlighted) Zone 1C
Single Layer of 4mm thk modified bituminus WP for PC-106, 108 (as highlighted) Zone 2C
Single Layer of 4mm thk modified bituminous wp for Foundation of Zone 1P TIP
Steel Reinforcement of BOI-BOV 122 (as Highlighted) Zone 2Q
Concrete pouring & Shuttering for Kicker (Outside) at Span 48 and Kicker (Inside) at Span 49 of boun
Coordinates & Top levels for Kicker (Outside) at Span 48 and Kicker (Inside) at Span 49 of boundary
Inpection of Manhole Base Installation, UPVC Pipe Connection and Casting Concrete for Short Piece (FW
Concrete pouring & Shuttering for Kicker (Outside) of boundary wall at Span 43, 44, 45 & 46 of Wate
Coordinates & Top levels of Kicker (Outside) for boundary wall at Span 43, 44, 45 & 46 of Water Gard
Single layer 4mm thk Modified Bituminous Water Proofing Membrane for Kicker (Inner Face) of Bound
Single layer 4mm thk Modified Bituminous Water Proofing Membrane for Kicker (Inner Face) of Bound
Solvent Base Primer prior to waterproofing membrane for Boundary wall Foundation (Inner Face) of
Solvent Base Primer for Foundation of Strip Footing Zone 2Q
Surface Preparation Prior to start Water proofing for Foundation of Strip Footing Zone 2Q
Solvent Base Primer for Foundation of Zone 1P TIP
Surface Preparation Prior to start Water proofing for Foundation of Zone 1P TIP
300 mm Gravel 3/8" Backfilling and Geotextile above Storm Water Line- Outfall X for (450mmØ-UPVC-
300 mm Gravel 3/8" Backfilling and Geotextile above Storm Water Line- Outfall A for (800mmØ-PP-
Inspection of Plaster Guide Points and Plaster Accessories prior to start Spatter Dash (Rough Coat) for
Stone Cladding for Boundary wall (Outer Face) @ Span 8, 9 & 10 of Water Garden, at Highlighted are
Concrete pouring & Shuttering for Wall at Span 26 & 27 of boundary wall @ Water Garden, as per hi
Coordinates & Levels for Wall at Span 26 & 27 of boundary wall @ Water Garden, as per highlighted
Single Layer of 4mm thk modified bituminus WP for PC-110 (as highlighted) Zone 2C
Surface Preparation Prior to start Water proofing for PC-111, 113 & 115 (as highlighted) Zone 2D
Single Layer of 4mm thk modified bituminus WP for PC-107 (as highlighted) Zone 2C
Stone Cladding for Column's of Boundary wall @ Column No. C16, C17 & C18 (All Sides), As per Attac
Shuttering and Concreting of Pile Cap (Foundation) 165 & 166 (as Highlighted) Zone 2L
Stone Cladding for Column's of Boundary wall @ Column No. C13, C14 & C15 (All Sides), As per Attac
Applying Crack filler to Cracks for repair (14 no's) (from 5 to 21) on Parapet wall (External side) at
Sealant filling for New Conctrol Joints (06 no's) (# 2, 3, 4, 5, 6 & 7) on Parapet wall (External side) a
Surface Preparation prior to Stone Cladding for boundary wall (Outer face) @ span 37, 38 & 39 @ Wat
Stone Cladding for Column's of Boundary wall @ Column No. C59, C60A, C60B, C61A, C61B & C61C (All
Inspection of Block work upto Final Heights with Installation of Adjustable Angle and Filler Board at
INSPECTION FOR APPLICATION OF PRIMER (FW1-2.1, FW1-2.2, FW1-4, FW12, FW12-1, FW12-2, FW13, FW
"INSPECTION OF SURFACE PREPERATION FOR CONCRETE ENCASEMENT (FW1-2.1, FW1-2.2, FW1-4, FW12,
Inpection of Manhole Base Installation, UPVC Pipe Connection and Casting Concrete for Short Piece (FW
'Pipe Installation of Storm Water Line- Outfall A for (800mmØ-PP- Corrugated) 44m Length from (MH-A
Level & Location of Pile Cap PC 103 (as Highlighted) Zone 2C
Level, Location of Tunnel 1 Service access (as Highlighted) Near Axis 02-1
Concreting for Tunnel 1 Service Access (near Axis 02-01) as Highlighted
Shutteringt for Tunnel 1 Service Access (near Axis 02-01) as Highlighted
Steel Reinforcement of Pile Cap (Foundation) 112 (as Highlighted) Zone 2D
Shuttering and Concreting of Pile Cap (Foundation) 112 (as Highlighted) Zone 2D
Shuttering and Concreting of Pile Cap (Foundation) 103 (as Highlighted) Zone 2C
Solvent base Primer Coating for PC-106, 108 & 110 (as highlighted) Zone 2C
Surface Preparation Prior to start Water proofing for PC-106, 108 & 110 (as highlighted) Zone 2C
Solvent base Primer Coating for PC-107 & 109 (as highlighted) Zone 2C
Surface Preparation Prior to start Water proofing for PC-107 & 109 (as highlighted) Zone 2C
Concrete pouring & Shuttering for Footing of boundary wall at Span 41 & 42 @ Water Garden, as per
Steel Reinforcement for Footing & Kicker of boundary wall at Span 41 & 42 @ Water Garden, as per
"Inspection for application of Protection Layer 4mm Thick Bituminous Protection Board on top of Bitum
Surface Preparation prior to Stone Cladding for boundary wall (Outer face) @ span 34, 35 & 36 @ Wat
Stone Cladding for Boundary wall (Outer Face) @ Span 8, 9 & 10 of Water Garden, at Highlighted are
Stone Cladding for Boundary wall (Inner Face) @ Span 8, 9 & 10 of Water Garden, at Highlighted area
Stone Cladding for Boundary wall (Inner Face) @ Span 01 of Water Garden, at Highlighted area in At
Steel Reinforcement for Wall of Boundary wall (E) at Sound & Light Garden, At highlighted area in at
Concrete pouring & Shuttering for Kicker (Inside) at Span 48 and Kicker (Outside) at Span 49 of boun
Coordinates & Top levels for Kicker (Inside) at Span 48 and Kicker (Outside) at Span 49 of boundary
Steel Reinforcement for Wall at Span 26 & 27 of boundary wall @ Water Garden, as per highlighted
Steel Reinforcement for Wall of Boundary wall (G) at Sound & Light Garden, At highlighted area in at
Concrete pouring & Shuttering for Kickers of Light wall (A, B, C, D, E, F, G & H) at Sound & Light Gard
Concrete pouring & Shuttering for Wall of Boundary wall (C) at Sound & Light Garden, At highlighted
Coordinates & Level for Wall of Boundary wall (C) at Sound & Light Garden, At highlighted area in at
Installation of UPVC conduit (Dia.160mm - 15pcs.) LV Ductbank 3 layers for Incoming Cable Switch Boa
Excavation for Storm Water Line Inside Management Building. As per high lighted.
Protection Layer of 4mm thk Bituminous Protection Board for PC-105 (as highlighted) Zone 2C
Shuttering and Concreting of Pile Cap (Foundation) 111 & 113 (as Highlighted) Zone 2D
Protection layer of geo-textile sheet and 50mm thk screed for MCPE 2 Zone 2H (as Highlighted) Axis 02-
Base Primer Coating (50% x 50%) water and bitumin above blinding for MCPE 2 Zone 2H (as Highlighted)
2 layer of 4mm thk modified bituminous water proofing above blinding for MCPE 2 Zone 2H (as Highligh
Protection layer of geo-textile sheet and 50mm thk screed above blinding for MCPE 2 Zone 2H (as Highl
2 coat of bituminous damp proofing-coating for 2 Foundations in Zone 2Q Internal BLDG North admin (a
Protection layer of 4mm thk bituminous protection board for 2 Foundations in Zone 2Q Internal BLDG N
Shuttering and Concreting of Pile Cap (Foundation) 115 (as Highlighted) Zone 2D
Steel Reinforcement of Pile Cap (Foundation) 109 (as Highlighted) Zone 2C
Steel Reinforcement for Strip Footing Foundation at Zone 2Q Between PC 193-191, 191-189 & 125-123
Concrete pouring & Shuttering for Kicker (Inside) for boundary wall at Span 43, 44, 45 & 46 of Water
Coordinates & Top levels of Kicker (Inside) for boundary wall at Span 43, 44, 45 & 46 of Water Garde
Steel Reinforcement for Wall of Boundary wall (D) at Sound & Light Garden, At highlighted area in at
Openning of New Conctrol Joints (06 no's) (# 2, 3, 4, 5, 6 & 7) on Parapet wall (External side) at Grid
Openning of Cracks for repair (14 no's) (from 5 to 21) on Parapet wall (External side) at Grid (A/3-8)
Chipping of Additional concrete from the Plaster level on Parapet wall (External side) at Grid (A/3-8
Aluminium Flashing & Sealant for Water Proofing of Boundary wall Foundation (Inner & Outer Faces)
300 mm Gravel 3/8" Backfilling and Geotextile above Storm Water Line -Outfull-A for ( 800mmØ - PP
Pipe Installation of Storm Water Line- Outfall-X for (315mmØ-UPVC- Class 4) 20m Length from (MH-X-
Gravel 3/8'' Bedding and Geotextile Surronding Storm Water Line- Outfall-X for (315mmØ-UPVC- Clas
Pipe Installation of Storm Water Line- Outfall-A for (315mmØ-UPVC- Class 4) 48m Length from (MH-A-
Gravel 3/8'' Bedding and Geotextile Surronding Storm Water Line- Outfall-A for (315mmØ-UPVC- Clas
Level & Location of Pile Cap PC 165 & 166 (as Highlighted) Zone 2L
Level & Location of Pile Cap PC 116 (as Highlighted) Zone 2D
Steel Reinforcement of BII-BIV 122 (as Highlighted) Zone 2Q
Shuttering and Concreting of Pile Cap (Foundation) 165 & 166 (as Highlighted) Zone 2L
Single layer of 4mm thk modified bituminous WP for PC-105 (as highlighted) Zone 2C
Shuttering and Concreting of Pile Cap (Foundation) 116 (as Highlighted) Zone 2D
Steel Reinforcement of Pile Cap (Foundation) 116 (as Highlighted) Zone 2D
Surface Preparation Prior to start Backfilling for Around Pilecaps 173, 171, 169, 167 (as Highlighted) Zo
Soil Preperation prior to start backfilling Sub-Grade for Seating Area (1) (SA-17) (Inside+outside Area) -
INSPECTION FOR MANHOLE BASE INSTALLATION, UPVC PIPE CONNECTION AND CASTING CONCRETE FOR SH
INSPECTION FOR MANHOLE BASE INSTALLATION, UPVC PIPE CONNECTION AND CASTING CONCRETE FOR S
Solvent base Primer Coating for PC-105 (as highlighted) Zone 2C
Surface Preparation Prior to start Water proofing for PC-105 (as highlighted) Zone 2C
Steel Reinforcement of Pile Cap (Foundation) 103 (as Highlighted) Zone 2C
Anti Termite Application Under Blinding for MCPE (small area) as highlighted in Zone 2J
Concreting of Blinding for MCPE (small area) as highlighted in Zone 2J
Steel Reinforcement of Pile Cap (Foundation) 165 & 166 (as Highlighted) Zone 2L
Shuttering and Concreting for Buttress BIV 113 top of PC to Bottom of Ring beam
Level & Location of Pile Cap PC 112 (as Highlighted) Zone 2D
Level and Location of Blinding for MCPE Foundation at Zone 2J (small area) (as Highlighted)
Level and Location of Excavation for MCPE Foundation at Zone 2J (small area) (as Highlighted)
Level & Location for BIV- 113 Zone 2N (as highlighted)
Level & Location for BII- 115 Zone 2N (as highlighted)
Shuttering and Concreting for Buttress BII 115 top of PC to Bottom of Ring beam
Installation of Weatherproof Box(2pcs.) and straight PVC conduit 20mm (1pcs.) each column for C
Stone Cladding for Boundary wall (Inner Face) @ Span 20 & 21 of Water Garden, at Highlighted area
Stone Cladding for Boundary wall (Inner Face) @ Span 18 & 19 of Water Garden, at Highlighted area
Installation of Box and UPVC straight conduit (Dia.25mm) for Power (13A Twin Switched Socket Outlet
Installation of UPVC conduit (Dia.110mm-2pcs.) TELECOM Ductbank no.BB/D-TL/58 at the Water Garden
Installation of PVC conduit & Box'es for Cleaner Socket at Maintenance & Management Bldg. as per h
Level & Location of Pile Cap PC 114 (as Highlighted) Zone 2D
Shuttering and Concreting of Pile Cap (Foundation) 114 (as Highlighted) Zone 2D
Pipe Installation of Subsurface Drainage(Main Line) for (160mmØ-UPVC- Class 4) 12m Length & (110
Casting of Blinding Concrete for Storm Water Manholes (MH-A-07, MH-A-08, MH-A-09, MH-A-13, MH-
Casting of Blinding Concrete for Foul Water Manholes (FW15 & FW16). At highlighted Area in the at
Warning Tape Installation for Storm Water Line- Outfall A for (400mmØ-UPVC- Class 4) 38 Length fr
Warning Tape Installation for Storm Water Line- Outfall A for (400mmØ-UPVC- Class 4) 30m Length f
Warning Tape Installation for Storm Water Line- Outfall A for (400mmØ-UPVC- Class 4) 58m Length f
300 mm GRAVEL Backfilling above Storm Water Line- OutFall - A for (450mmØ-UPVC-Class4 ) 34.5m L
WARNING TAPE Installation for Storm Water Line- Outfall A for (450mmØ-UPVC-Class4 ) 28m Lengt
Concrete pouring & Shuttering for Footings of boundary wall at Span 43, 44, 45 & 46 of Water Garden
WARNING TAPE Installation for Storm Water Line- Outfall A for (450mmØ-UPVC-Class4 ) 29m Lengt
Concrete pouring & Shuttering of Footings for boundary wall at Span 48 & 49 of Water Garden, as pe
Steel Reinforcement for Wall of Boundary wall (C) at Sound & Light Garden, At highlighted area in at
300 mm GRAVEL Backfilling above Storm Water Line- OutFall - A for (800mmØ-PP-Corrugated ) 90m L
Coordinates & Levels for Kickers of Light wall (A, B, C, D, E, F, G & H) at Sound & Light Garden, At hig
300 mm GRAVEL Backfilling above Foul Water Line (160mmØ-UPVC-Class 4) 69m Length from (FW1-1 t
Concrete pouring & Shuttering for Wall of Boundary wall (B) at Sound & Light Garden, At highlighted
Coordinates & Levels for Wall of Boundary wall (B) at Sound & Light Garden, At highlighted area in a
Excavation for Storm Water Line Inside Management Building. As per high lighted.
Gravel & Geotextile for Sub Surface Branch Drain Pipe (Main line 110mm & 160mm)(250mm, 200mm &
Surface Preparation prior to Stone Cladding for boundary wall (Outer face) @ span 30 & 33 @ Water
300 mm GRAVEL Backfilling above Storm Water Line- Outfall X for (450mmØ-UPVC- Class 4) 60m Length
Surface preparation prior to Damp Proofing for Pedestal (Column's Surround) (06 no's @ Grids A / 3, 4
Inspection of Internal Plastering at Grid between (15-18/B-D) (Finance Room # GF 5013 & Director Ro
Excavation for STORM WATER LINE from (MH-A-15 to G-A-01) After Final Layer of Backfilling. As per h
300 mm GRAVEL Backfilling above Storm Water Line - Outfall A for (600mmØ-PP- Corrugated) 78m Le
Inspection for application of Bituminous Damp Proofing (2nd Coat) on top of Primer for Foundation and
Concrete pouring & Shuttering for Kicker (Inside) of Boundary wall (A & G) at Sound & Light Garden, A
Level & Location of Pile Cap PC 159, 161, 163 (as Highlighted) Zone 2L
Concrete pouring & Shuttering of Wall at Span 28 & 29 of boundary wall of Water Garden, as per hig
Stone Cladding for Column's of Boundary wall @ Column No. C65, C66A, & C66B (All Sides), As per At
Steel Reinforcement for Footings & Kicker of boundary wall at Span 48 & 49 of Water Garden, as per
Surface Preparation prior to waterproofing for Boundary wall Foundation (Inner Faces) of Span 30, 3
Aluminium Flashing & Sealant for Water Proofing of Boundary wall Foundation (Outer Faces) of Span
Level & Location of Strip footing (as Highlighted) Zone 2Q Between PC 192-190, 189-187
Shuttering and Concreting of Strip Footing (as Highlighted) Zone 2Q
Steel Reinforcement of Strip Footing (as Highlighted) Zone 2Q
Steel Reinforcement of Pile Cap (Foundation) 114 (as Highlighted) Zone 2D
Excavation for Foul Water Manholes (FW15 & FW16). At highlighted Area in the attached Dwg.
Installation of chilled water pipes (Black Steel sch. 40); as per high lighted in dwg.
Installation of chilled water pipes (Black Steel sch. 40); as per high lighted in dwg.
Steel Reinforcement for Wall of Boundary wall (B) at Sound & Light Garden, At highlighted area in at
Slated layer 4mm thk Modified Bituminous Water Proofing Membrane for Boundary wall Foundation (Ou
Coordinates & Top levels of Footings for boundary wall at Span 48 & 49 of Water Garden, as per high
Coordinates & Top levels of Wall at Span 28 & 29 of boundary wall of Water Garden, as per highligh
Coordinates & Levels for Kicker (Inside) of Boundary wall (A & G) at Sound & Light Garden, At highlig
Inspection for application of Bituminous Damp Proofing (1st Coat) on top of Primer for Foundation and
Soil Preperation prior to start backfilling Wall Outside for SBC 4 - As Highlighted
Protection Layer 4mm thk. Bituminous Protection Board for Boundary wall Foundation (Outer Faces) o
Concrete pouring & Shuttering for Footings of Light wall (A, B, G & F) at Sound & Light Garden, At hig
Soil Preparation prior to Backfill along the Boundary Wall (Inner Side) of span 14, 15, 16, 17, 18, 19
Inspection of Internal Plastering at Grid between (11-15/B-E) (Sceintific Room # GF 5020 & Human R
Concrete pouring & Shuttering for Kicker (Inside) of Boundary wall (F) at Sound & Light Garden, At hi
Coordinates & Levels for Kicker (Inside) of Boundary wall (F) at Sound & Light Garden, At highlighted
Steel Reinforcement for Footings & Kicker of boundary wall at Span 43, 44, 45 & 46 of Water Garden,
Coordinates & Top levels of Footings for boundary wall at Span 43, 44, 45 & 46 of Water Garden, as
Coordinates & Levels for Footings of Light wall (A, B, G & F) at Sound & Light Garden, At highlighted
Steel Reinforcement for Footing & Kicker of Light wall (A, B, G & F) at Sound & Light Garden, At highl
Level & Location of Pile Cap PC 109 (as Highlighted) Zone 2C
Steel Reinforcement of Pile Cap (Foundation) 160 to 166 (as Highlighted) Zone 2L
Shuttering and Concreting of Pile Cap (Foundation) 163 (as Highlighted) Zone 2L
Steel Reinforcement of Pile Cap (Foundation) 163 (as Highlighted) Zone 2L
Shuttering and Concreting of Pile Cap (Foundation) 161 (as Highlighted) Zone 2L
Steel Reinforcement of Pile Cap (Foundation) 161 (as Highlighted) Zone 2L
Shuttering and Concreting of Pile Cap (Foundation) 159 (as Highlighted) Zone 2L
Steel Reinforcement of Pile Cap (Foundation) 159 (as Highlighted) Zone 2L
Level & Location of Pile Cap PC 106 & 108 (as Highlighted) Zone 2C
Shuttering and Concreting of Pile Cap (Foundation) 108 (as Highlighted) Zone 2C
Steel Reinforcement of Pile Cap (Foundation) 108 (as Highlighted) Zone 2C
Shuttering and Concreting of Pile Cap (Foundation) 106 (as Highlighted) Zone 2C
Steel Reinforcement of Pile Cap (Foundation) 106 (as Highlighted) Zone 2C
300 mm GRAVEL Backfilling above Foul Water Line for (160mmØ-UPVC- Class 4) 33m Length from (FW1
Casting of Blinding Concrete of Storm Water Line for Catch Basin (G-B-05,06 & 09). As per high lighte
Excavation of Storm Water Line for Catch Basin (G-B-05,06 & 09) Prior Blinding Concrete. As per high
Surface Preperation prior to start backfilling behind the boundary wall at Zone-D (As Highlighted)
Inspection for application of Base Primer (50%x50% Bitumin & Water) on Beam at Saeting Area (1) Zone-
Level & Location of Pile Cap PC 110 and 112 (as Highlighted) Zone 2C and 2D
Shuttering and Concreting of Pile Cap (Foundation) 110 (as Highlighted) Zone 2C
Steel Reinforcement of Pile Cap (Foundation) 110 (as Highlighted) Zone 2C
Shuttering and Concreting of Pile Cap (Foundation) 112 (as Highlighted) Zone 2D
Steel Reinforcement of Pile Cap (Foundation) 112 (as Highlighted) Zone 2D
Shuttering and Concreting of Pile Cap (Foundation) 109 (as Highlighted) Zone 2C
Shuttering and Concreting of Pile Cap (Foundation) 105 & 107 (as Highlighted) Zone 2C
Level & Location of Pile Cap PC 105 & 107 (as Highlighted) Zone 2C
Steel Reinforcement of Pile Cap (Foundation) 105 & 107 (as Highlighted) Zone 2C
Completion of Rock Boulder No. RB- 285 with Grouting
Inspection for application of Protection Layer 4mm Thick Bituminous Protection Board on top of Bitum
Concrete pouring & Shuttering of Wall (H) of Boundary wall at Sound & Light Garden, At highlighted a
Coordinates & Levels of Wall (H) of Boundary wall at Sound & Light Garden, At highlighted area in at
Concrete pouring & Shuttering of Kicker (Inside) of Span 26 and Kicker (Outside) of Span 27 for boun
Coordinates & Levels of Kicker (Inside) of Span 26 and Kicker (Outside) of Span 27 for boundary wall
Installation of Weatherproof Box(2pcs.) and straight PVC conduit 20mm (1pcs.) each column for
Installation of Weatherproof Box (2pcs.) and straight PVC conduit 20mm(1pcs.) each column for
Excavation & Bed Preparation of Storm Water Line for Catch Basin (G-B-01,02,03 and 04). As per high
Casting of Blinding Concrete of Storm Water Line for Catch Basin (G-B-01,02,03 and 04). As per high l
Protection layer of geotextile sheet and 50mm screed above blinding for MCPE 3 Zone 2H (as Highlighte
Two layer of 4mm thick modified water proofing membrane above blinding for MCPE 3 Zone 2H (as Highl
Base Primer Coating 50% x 50% bitumin and water above blinding for MCPE 3 Zone 2H (as Highlighted) A
Surface Preparation Prior to start Water proofing above blinding for MCPE 3 Zone 2H (as Highlighted) Ax
Steel Reinforcement for Wall of Span 28 of Boundary wall of Water Garden, as per highlighted Attac
Concrete pouring & Shuttering for Footing of boundary wall at Span 40, 41 & 42 of Water Garden, as
Coordinates & Top levels of Footings for boundary wall at Span 40, 41 & 42 of Water Garden, as per
Steel Reingforcement for Footing & Kicker of boundary wall at Span 40, 41 & 42 of Water Garden, as
Geo Textile for Blinding under boundary wall @ Span 48 & 49 of Water Garden, as per highlighted At
Protection Layer 4mm thk. Bituminous Protection Board (Both sides 500mm wide) for Blinding under
Single layer 4mm thk Modified Bituminous Water Proofing Membrane (Both sides 500mm wide) for Bl
Excavation & Bed preparation for Sub Surface Branch Drain Pipe (Main line 110mm & 160mm)(250m
Stone Cladding for Boundary wall (Inner Face) @ Span 01 of Water Garden, at Highlighted area in At
Concrete pouring & Shuttering for Footing of Light wall (C, D, E & H) at Sound & Light Garden, At high
Soil Preperation prior to start backfilling Sub-Grade of Seating Area (2) (SA-31) (Inside+outside A
Soil Preperation prior to start backfilling Sub-Grade of Seating Area (2) (SA-30) (Inside+outside A
Installation of UPVC straight conduit (Dia.25mm 1Pc.each - CAM,Telephone Outlet & Data Outlet) with
Installation of UPVC straight conduit (Dia.25mm 1Pc.each - CAM) and Box for Security at the Mainte
Installation of UPVC straight conduit (Dia.25mm 1Pc.each - Fire Alarm Flashing & Break Glass) and Bo
Installation of straight UPVC conduit (Dia. 25mm: CCTV) and Box for Security at the Crescent-02 (Axis
Level & Location of Pile Cap PC 160, 162, 164 (as Highlighted) Zone 2L
Shuttering and Concreting of Pile Cap (Foundation) 160, 162, 164 (as Highlighted) Zone 2L
Protection layer of geotextile sheet and screed protection 50mm thk above blinding for MCPE 2 Zone 2J
Two layer of 4mm thk modified bituminous waterproofing membrane above blinding for MCPE 2 Zone 2J
Base Primer Coating 50% x 50% water and bitumin above blinding for MCPE 2 Zone 2J & 2K (as Highligh
Surface Preparation Prior to start Water proofing above blinding for MCPE 2 Zone 2J & 2K (as Highlight
Pipe Installation of Foul Water Line (160mmØ-UPVC-Class 4) 69m Length ( 4m - 6m Average Depth ) f
Pipe Installation of Storm Water Line- Outfall A for (800mmØ-PP- Corrugated) 121m Length (2 - 4m De
Gravel Bedding and Geotextile Surronding Storm Water Line- Outfall A for (800mmØ-PP- Corrugated)
Gravel Bedding and Geotextile Surronding Foul Water Line for (160mmØ-UPVC- Class 4) 69m Length f
Pipe Installation of Foul Water Line for (160mmØ-UPVC- Class 4) 33m Length from (FW14 to FW16). A
Steel Reinforcement for Wall (H) of Boundary wall at Sound & Light Garden, At highlighted area in at
Stone Cladding for Boundary wall (Inner Face) @ Span 18 & 19 of Water Garden, at Highlighted area
Soil Preparation prior to Backfill along the Boundary Wall (Outer Side) of span 7, 8, 9, 10 & 11 of Wa
2nd Coat Cementitious Water Proofing for Blinding under boundary wall @ Span 48 & 49 of Water Ga
1st Coat Cementitious Water Proofing for Blinding under boundary wall @ Span 48 & 49 of Water Gar
Solvent Base Primer Coating (Both sides 500mm wide) for Blinding prior to Water proofing under bo
Surface Preparation prior to waterproofing on Blinding of boundary wall Span 48 & 49 of Water Gard
Steel Reinforcement for Wall of Span 29 of Boundary wall of Water Garden, as per highlighted Attac
1st layer Bituminous Membrane for Blinding Under Columns at Grid (5/3 & 3') (4/A & E) (5/4 & 4') & (5
1st layer Bituminous Membrane for Blinding Under Columns at Grid (4/A) (1/B,C,& D) (2/E) & (4/F) alo
Single layer 4mm thk Modified Bituminous Water Proofing Membrane for Boundary wall Foundation (Ou
Concrete pouring for Blinding of boundary wall at Span 48 & 49 of Water Garden, as per highlighted
Solvent Base Primer prior to waterproofing membrane for Boundary wall Foundation (Outer Faces) of
Inspection of Internal Plastering at Grid between (10-11/B-E) (Technical Room # GF 5022) as highligh
Concrete pouring & Shuttering for Kicker (Inside) of Boundary wall (B) @ Sound & Light Garden, At hi
Coordinates & levels of Kicker (Inside) of Boundary wall (B) @ Sound & Light Garden, At highlighted a
Coordinates & levels of Wall (I) of Boundary wall @ Sound & Light Garden, At highlighted area in att
Concrete pouring & Shuttering for Wall (I) of Boundary wall @ Sound & Light Garden, At highlighted a
Steel Reinforcement for Wall (I) of Boundary wall at Sound & Light Garden, At highlighted area in att
Coordinates & levels of Footing for Light wall (C, D, E & H) at Sound & Light Garden, At highlighted ar
Steel Reinforcement for Footing & Kicker of Light wall (C, D, E & H) at Sound & Light Garden, At highl
Geo Textile for Blinding under boundary wall @ Span 43, 44, 45 & 46 of Water Garden, as per highli
Protection Layer 4mm thk. Bituminous Protection Board (Both sides 500mm wide) for Blinding under
Single layer 4mm thk Modified Bituminous Water Proofing Membrane (Both sides 500mm wide) for Bli
Inspection for Coordinates and Levels of Existing footing of Ticket Booth # 5.
Aluminium Flashing & Sealant for Water Proofing of Boundary wall Foundation (Inner & Outer Faces)
Concrete Surface Preperation prior to start the Waterproofing at Seating Area (1) at Zone-K (SA-14) As
Level, Location & Coordinates for Strip Footing Foundation at Zone 2Q.
Steel Reinforcement for Buttress BIV - BII 122 (1st).
Shuttering and Concreting of Strip Footing Foundation at Zone 2Q.
Steel Reinforcement for Strip Footing Foundation at Zone 2Q.
Installation of straight UPVC conduit (Dia.32mm 2Pcs. Each F1/CE & F2 )for Lighting (Flood Light) an
Inspection for application of Protection Layer 4mm Thick Bituminous Protection Board on top of Bitum
Completion of Rock Boulder No. RB- 68 with Grouting
300 mm GRAVEL Backfilling above Storm Water Line- Outfall X for (450mmØ-UPVC- Class 4) 60m Length
Gravel Bedding and Geotextile Surronding Foul Water Line for (160mmØ-UPVC- Class 4) 33m Length f
Warning Tape Installation of Foul Water Line (400mmØ - UPVC - Class 4) from (FW1 to FW1-1) NE
Soil Preperation prior to start backfilling Sub-Grade of Seating Area (3) (SA-23) (Inside+outside A
Installation of straight UPVC conduit (Dia. 25mm: CCTV) and Box for Security at the Crescent-02 (Axis
Installation of straight UPVC conduit (Dia. 25mm: 2Pcs each (WIFI) and Box for Voice and Data at the
Installation of straight UPVC conduit (Dia. 25mm) and Box for Fire Alarm (Speaker & Flashing Beacon)
Installation of straight UPVC conduit (Dia.32mm 2Pcs. Each Socket Outlet) for Power at the Crescent -0
Coordinates & top levels of Blinding of boundary wall at Span 48 & 49 of Water Garden, as per highl
Slated layer 4mm thk Modified Bituminous Water Proofing Membrane for Boundary wall Foundation (I
Surface Preparation prior to waterproofing for Boundary wall Foundation (Outer Faces) of Span 30, 3
Inspection of Spatter Dash (Rough Coat) prior to Internal Plastering at Grid between (13-15/F-H & N-
Concrete pouring and Shuttering for Pedestal Column's (03 no's @ Grids A / 6, 7 & 8) & with Anchor B
Protection Layer 4mm thk. Bituminous Protection Board for Boundary wall Foundation (Inner & Outer
Coordinates and Levels for Pedestal Column's (03 no's @ Grids A / 6, 7 & 8) & with Anchor Bolts at T
Concrete pouring & shuttering of Pedestal Beam (Kicker) for New Ticket booths # 1A & 2A, as per hig
2nd Coat Cementitious Water Proofing for Blinding under boundary wall @ Span 43, 44, 45 & 46 of W
1st Coat Cementitious Water Proofing for Blinding under boundary wall @ Span 43, 44, 45 & 46 of Wa
Solvent Base Primer Coating (Both sides 500mm wide) for Blinding prior to Water proofing under bou
Surface Preparation prior to waterproofing on Blinding of boundary wall Span 43, 44, 45 & 46 of Wat
Concrete Pouring & Shuttering for Wall & Buttress @ Grid 17 to 24 or (16-22/Right Side) of Boundary
Coordinates, Levels & Alignment for Wall & Buttress @ Grid 17 to 24 or (16-22/Right Side) of Boundar
Aluminium Flashing & Sealant for Water Proofing of boundary wall (Kicker) (Inner face) @ span 7, 8,
Slated layer 4mm thk Modified Bituminous Water Proofing Membrane for boundary wall (Kicker) (Inner
Single layer 4mm thk Modified Bituminous Water Proofing Membrane for boundary wall (Kicker) (Inner
Solvent Base Primer Coating of Water Proofing for boundary wall Foundation (Inner face) @ span 7 o
Shuttering and Concreting of Pile Cap (Foundation) 109 (as Highlighted) Zone 2C
Steel Reinforcement of Pile Cap (Foundation) 109 (as Highlighted) Zone 2C
Shuttering and Concreting of Pile Cap (Foundation) 115 (as Highlighted) Zone 2D
Steel Reinforcement of Pile Cap (Foundation) 115 (as Highlighted) Zone 2D
Level & Location of Pile Cap PC 109 (as Highlighted) Zone 2C
Level & Location of Pile Cap PC 115 (as Highlighted) Zone 2D
Protection layer of 4mm thk bituminous protection board for 2 Foundations in Zone 2Q Internal BLDG N
2 coat of bituminous damp proofing-coating for 2 Foundations in Zone 2Q Internal BLDG North admin (a
Base primer coating 50% x 50% water and bitumin for 2 Foundations in Zone 2Q Internal BLDG North ad
Surface Preparation Prior to start Water proofing for 2 Foundations in Zone 2Q Internal BLDG North adm
Protection layer of 4mm thck bituminous protection board for Below Foundation PC 133 to 138 (zone 2G
Protection layer of geotextile sheet and 30mm screed for Below Foundation PC 133 to 138 (zone 2G) as
Single layer of 4mm thk modified bituminous WP membrane for Below Foundation PC 133 to 138 (zone 2
Protection layer of 4mm thck bituminous protection board for Below Foundation PC 125 to 132 (zone 2F
Protection layer of geotextile sheet and 30mm screed for Below Foundation PC 125 to 132 (zone 2F) as
Single layer of 4mm thk modified bituminous WP membrane for Below Foundation PC 125 to 132 (zone 2
'Pipe Installation of Storm Water Line- Outfall A for (600mmØ-PP- Corrugated) 78m Length from (MH-
'Gravel Bedding and Geotextile Surronding Storm Water Line- Outfall A for (600mmØ-PP- Corrugated
Excavation of STORM WATER Line for Catch Basin (G-B-07 & G-B-08). As per high lighted.
Casting of Blinding Concrete of STORM WATER Line for Catch Basin (G-B-07 & G-B-08). As per high li
Inspection for application of Bituminous Damp Proofing (2nd Coat) for Beam at Seating Area (1) Zone-G
Inspection for application of Bituminous Damp Proofing (st Coat) for Beam on top of Primer for Founda
Installation of UPVC conduit (Dia.160mm - 15pcs.) LV Ductbank 3 layers for Incoming Cable Switch Boa
Completion of Rock Boulder No. RB- 93 with Grouting
Completion of Rock Boulder No. RB- 83 with Grouting
Completion of Rock Boulder No. RB- 80 with Grouting
Completion of Rock Boulder No. RB- 79 with Grouting
Completion of Rock Boulder No. RB- 74 with Grouting
Inspection for application of Base Primer (50%x50% Bitumin & Water) on Beam at Saeting Area (1) Zone-
Inspection for application of Bituminous Damp Proofing (2nd Coat) on top of Primer for Foundation and
Inspection for application of Bituminous Damp Proofing (1st Coat) on top of Primer for Foundation and
Coordinates & Levels of Kicker (Inside & Outside) of Boundary wall (E) and Kicker (Inside-2) & (Outsid
Concrete Pouring & Shuttering for Kicker (Inside & Outside) of Boundary wall (E) and Kicker (Inside-2
Concrete pouring & Shuttering for Pedestal (Column's 05 no's @ Grids B / 1, 2 & 3 and A / 1 & 2) of
Steel Reinforcement for Pedestal Column's (03 no's @ Grids A / 6, 7 & 8) of Ticket Booths Canopy.
Concrete pouring for Blinding of boundary wall at Span 43, 44, 45 & 46 of Water Garden, as per high
Stone Cladding for Column's of Boundary wall @ Column No. C86, C87, & C88 (All Sides), As per Attac
Protection layer of geo-textile sheet and 50mm thk screed above blinding for MCPE 2 Zone 2H (as Highl
2 layer of 4mm thk modified bituminous water proofing above blinding for MCPE 2 Zone 2H (as Highligh
Base Primer Coating (50% x 50%) water and bitumin above blinding for MCPE 2 Zone 2H (as Highlighted)
Stone Cladding for Column's of Boundary wall @ Column No. C83, C84, & C85 (All Sides), As per Attac
Surface Preparation Prior to start Water proofing above blinding for MCPE 2 Zone 2H (as Highlighted) A
Protection layer of geo-textile sheet and 50mm thk screed for MCPE 2 Zone 2H (as Highlighted) Axis 02-
Coordinates & top levels of Blinding of boundary wall at Span 43, 44, 45 & 46 of Water Garden, as pe
Level & Location for BOV- 113 Zone 2N (as highlighted)
Level & Location for BIV- 114 Zone 2N (as highlighted)
Shuttering and Concreting for Buttress BIV 114 top of PC to Bottom of Ring beam
Installation of UPVC straight conduit (Dia.25mm) with Box (13A Cleaner Socket, Wall Mounted 1
Concrete Pouring & Shuttering for Kicker (Outside) of Span 26 & 28 and Kicker (Inside) of Span 27 fo
300 mm GRAVEL Backfilling above Foul Water Line for (160mmØ-UPVC- Class 4) 88m Length from (FW1
Coordinates & Levels of Kicker (Outside) of Span 26 & 28 and Kicker (Inside) of Span 27 for boundary
Solvent Base Primer prior to waterproofing membrane for Blinding Under Columns at Grid (5/3 & 3') (4/
Excavation for STORM WATER LINE from (MH-A-15 to G-A-01) After Final Layer of Backfilling. As per h
Solvent Base Primer prior to waterproofing membrane for Blinding Under Columns at Grid (4/A) (1/B,C,
300 mm GRAVEL Backfilling above Storm Water Line- Outfall A for (400mmØ-UPVC- Class 4) 38 Length
Concrete Pouring & Shuttering for Kicker (Outside) of Boundary wall (A, B & G) and Kicker (Inside & O
Installation of Rock and Boulder No. RB-115a (2nd & 3rd Layer)
'300 mm GRAVEL Backfilling above Storm Water Line- Outfall A for (400mmØ-UPVC- Class 4) 30m Leng
Coordinates & Levels of Kicker (Outside) of Boundary wall (A, B & G) and Kicker (Inside & Outside) of
'300 mm GRAVEL Backfilling above Storm Water Line- Outfall A for (400mmØ-UPVC- Class 4) 58m Leng
Inspection of Plaster Guide Point and plaster accessories prior to start Spatter Dash (Rough Coat) for
300 mm GRAVEL Backfilling above Storm Water Line- Outfall B for (450mmØ-UPVC- Class 4) 36m Lengt
300 mm GRAVEL Backfilling above Storm Water Line- Outfall A for (450mmØ-UPVC- Class 4) 28m Leng
Level and Location for Retaining Wall - top and bottom of wall (between axis AB to Z) zone 1 (inner)
300 mm GRAVEL Backfilling above Storm Water Line- Outfall A for (450mmØ-UPVC- Class 4) 29m Leng
Level and Location of Excavation for MCPE Foundation at Zone 2E & 2F (small area) (as Highlighted)
Pipe installation of Storm Water Line- Outfall A for (400mmØ-UPVC- Class 4) 38m Length & (315mmØ
Level and Location of Blinding for MCPE Foundation at Zone 2E & 2F (small area) (as Highlighted)
GRAVEL BEDDING and Geotextile Surronding Storm Water Line- Outfall A for (400mmØ-UPVC- Class 4)
Concreting of Blinding for MCPE Zone 2E and 2F (small area) as highlighted
Application of Anti Termite under Blinding for MCPE Zone 2E and 2F (small area) as highlighted
Steel Reinforcement of Pile Cap (Foundation) 160 to 166 (as Highlighted) Zone 2L
Surface Preparation Prior to start Backfilling for Around Collonades Zone 2P (as Highlighted) Axis 02-A
Protection layer of 4mm thk bituminous Protection Board for 5 internal Foundation at Zone 2C (as Highl
Rock top level after Removing of Soil material at the base of boundary wall @ span 47, 48 & 49 @ Wa
Rock top level after Removing of Soil material at the base of boundary wall @ span 43, 44, 45 & 46
Gravel 3/8 Bedding & Geotextile Surround for Sub Surface Drain Pipe (110mm & 160mm Part 2) Inside
Excavation & Surface Preparation Prior to Cast Blinding of boundary wall @ span 43 & 44 @ Water Ga
Steel Reinforcement for Wall & Buttress @ Grid 17 to 24 or (16-23/Right Side), of Boundary wall at A
Single Layer Water proofing membrane 4mm thk. for Boundary wall Foundation (Inner & Outer Faces)
Single Layer Water proofing membrane 4mm thk. for Foundation of Boundary wall (Inner Face) @ Grid (
Concrete Surface Preperation for Beam prior to start the Waterproofing at Seating Area (1) at Zone-G (
Inspection for application of Base Primer (50%x50% Bitumin & Water) on Foundation and wall at Saeting
Soil Preperation prior to start backfilling Sub-Grade of Seating Area (2) (SA-29) (Inside+outside Area) -
Soil Preperation prior to start backfilling Sub-Grade of Seating Area (3) (SA-25) (Inside+outside A
Pipe installation for sub-suface drainage main line(160mmØ upvc class 4) & (110 CORRUGATED pipe upv
Excavation for STORM WATER LINE from (MH-A-01 to MH-A-02) include MH-A-01 prior start gravel bed
Two Layer of 4mm thk Modified bituminous waterproofing membrane for MCPE 2 Zone 2H (as Highlighte
Base Primer Coating 50% x 50% Bitumin and water for MCPE 2 Zone 2H (as Highlighted) Axis 02-Z to 02
Installation of Box and UPVC straight conduit (Dia.25mm) for Power (13A Cleaner Socket,Wall Mou
Surface Preaparation Prior to start Water proofing for MCPE 2 Zone 2H (as Highlighted) Axis 02-Z to 02
Protection Layer of Geotextile sheet and Screed Protection 50mm thk for MCPE 2 Zone 2G (as Highlighte
Shuttering and Concreting for Retaining wall (wall) At Axis AB to Z (as Highlighted)
Excavation for STORM WATER LINE from (MH-A-01 to OUT FALL )prior start gravel bedding; as per hi
Installation of Box and UPVC straight conduit (Dia.25mm) for External Lighting at the Maintenance an
Inspection of Geotextile & Gravel 3/8 Backfilling around Storm Water Line Manhol ( MH-B-04,MH-B-
Geo Textile for Blinding under boundary wall @ Span 40, 41 & 42 of Water Garden, as per highlighte
Protection Layer 4mm thk. Bituminous Protection Board (Both sides 500mm wide) for Blinding under
Single Layer Water proofing membrane 4mm thk. (Both sides 500mm wide) for Blinding under boundar
Completion of Stack Boulders with Grouting for Planted bed of Boat Garden, at highlighted area in a
Steel Reinforcement for Buttress BOV-BOI 115 (1st)
One Layer of 4mm thick Modified Bituminous WP mwmbrane for joints only (200m x 200m) of Zone 2N B
Filler Board, Backing Rod and Sealant of Zone 2N Between Axis 02-2, 02-AT to 02-AR (as Highlighted)
Steel Reinforcement for Buttress BOV-BOI 114 (1st)
Installation of earthing clamps with conductor 70mm (9pcs.) for earthing reinforcement steel re-bar at
Completion of Rock Boulder No.RB- 267 with Grouting
Inspection for application of Protection Board on top of Damp Proofing for External wall and Top Slab o
Concrete Surface Preperation prior to start the Waterproofing at Seating Area (1) at Zone-G (SA-17) As
Inspection for Concrete Benching Manhole for Storm Water No # ( MH-B-03 & MH-B 02 )at Zone-1
Inspection for application of Damp Proofing (2nd Coat) on top of Primer for External Wall and Top Slab
Inspection for application of Damp Proofing (1st Coat) on top of Primer for External Wall and Top Slab o
Inspection of Plaster Guide Point and plaster accessories prior to start Spatter Dash (Rough Coat) fo
2nd Coat Cementitious Water Proofing for Blinding under boundary wall @ Span 40, 41 & 42 of Water
1st Coat Cementitious Water Proofing for Blinding under boundary wall @ Span 40, 41 & 42 of Water
Solvent Base Primer Coating (Both sides 500mm wide) for Blinding prior to Water proofing under bo
Surface Preparation prior to waterproofing on Blinding of boundary wall Span 40, 41 & 42 of Water G
Inspection of Block work upto Final Height of 250mm thk (100mm wall, 50mm Cavity & 100mm wall) at
Crazy cut Stone cladding Installed for Boundary wall @ Elevation "D to A" (Inner face) @ Maze Garden
Concrete Pouring & Shuttering for Footing of Boundary wall (C, D, E, F & I) at Sound & Light Garden, A
Concrete Pouring & Shuttering for Footing of Boundary wall (A, B, G & H) at Sound & Light Garden, At
Stone Cladding for Boundary wall (Inner Face) @ Span 16 & 17 of Water Garden, at Highlighted area
Excavation & Soil Preparation Prior to Backfilling for foundation of boundary wall @ span 43, 44, 45
Steel Reinforcement for Buttress BOV-BOI 115 (2nd)
Steel Reinforcement for Buttress BOV-BOI 114 (2nd)
Steel Reinforcement for Buttress BOV-BOI 113 (2nd)
Steel Reinforcement of Pile Cap (Foundation) 111 & 113 (as Highlighted) Zone 2D
Shuttering and Concreting of Pile Cap (Foundation) 111 & 113 (as Highlighted) Zone 2D
Steel Reinforcement of Pile Cap (Foundation) 105 & 107 (as Highlighted) Zone 2C
Shuttering and Concreting of Pile Cap (Foundation) 105 & 107 (as Highlighted) Zone 2C
Concreting for Buttress BOV 113 top of PC to Bottom of Ring beam
Shuttering for Buttress BOV 113 top of PC to Bottom of Ring beam
Concreting for Buttress BIV 116 & 117 top of PC to Bottom of Ring beam
Shuttering for Buttress BIV 116 & 117 top of PC to Bottom of Ring beam
Level & Location of Pile Cap PC 111 & 113 (as Highlighted) Zone 2D
Level & Location of Pile Cap PC 105 & 107 (as Highlighted) Zone 2C
Level & Location for BIV-116, 117 & 113 Zone 2N (as highlighted)
Level & Location For Mid Section embossed Blinding for MCPE Zone 2J & 2K (axis 02-AC to 02-AH) as Hig
Shuttering and Concreting of embossed Blinding for MCPE Foundation at Zone 2J, 2K (as Highlighted)
Installation of straight UPVC conduit (Dia. 25mm: CCTV) and Box for Security at the Crescent-02 (Axis 0
Installation of straight UPVC conduit (Dia. 25mm: 2Pcs each CCTV &WIFI) and Box for Voice and Data at
Installation of Box and UPVC straight conduit (Dia.25mm) for External Lighting at the Maintenance Buil
Installation of straight UPVC conduit (Dia.32mmSocket Outlet) and Box for Power at the Crescent -02 (A
Installation of straight UPVC conduit (Dia.32mm 2Pcs. Each F1/CE & F2 ) and Box for Lighting (Flood Lig
Installation of earthing clamps with conductor 70mm for earthing reinforcement steel re-bar at Crescen
Installation of straight UPVC conduit (Dia. 25mm) and Box for Fire Alarm at the Crescent-02 (Axis 02/1E
Inspection for application of Externed Water Proofing For Base Manhole and Concrete encastment for
Completion of Rock Boulder No. RB- 68 with Grouting
Installation of Rock and Boulder No. RB-66 ( 5th Final Layer)
Soil Preperation prior to start backfilling around Manhol NO # (B-2,-3,-4 ) at Zone 1 - As Highlighted
Stone Cladding for Boundary wall (Outer Face) @ Grid (EXC4-09 to EXC4-01 to EXC3-01) at Physic Gard
Solvent Base Primer prior to waterproofing membrane for Foundation of Boundary wall (Inner Face) @
Solvent Base Primer prior to waterproofing membrane for Boundary wall Foundation (Inner & Outer F
Stone Cladding for Boundary wall (Inner Face) @ Span 14 & 15 of Water Garden, at Highlighted area
Stone Cladding for Column's of Boundary wall @ Column No. C83, C84, & C85 (All Sides), As per Attac
Existing levels prior to start Excavation for Stone Boulders at Layer 3 of (Part 1) at Geyser Garden i
Coordinates & Levels for Footings of Boundary wall (C, D, E, F & I) at Sound & Light Garden, At highl
Steel Reinforcement for Footing & Kicker of Boundary wall (D, E & F) at Sound & Light Garden, At high
Concrete Pouring & Shuttering for Footings of Span 26 & 27 for boundary wall of Water Garden, as p
Coordinates & Levels of Footings of Span 26 & 27 for boundary wall of Water Garden, as per highlig
Concrete Pouring & Shuttering for Wall & Buttress @ Grid 29 to 33 or (18-22/Left Side) of Boundary w
Coordinates, Levels & Alignment for Wall & Buttress @ Grid 29 to 33 or (18-22/Left Side) of Boundary
Concrete pouring & Shuttering of Kicker (Inside) of Span 28 & 29 for boundary wall of Water Garden,
Coordinates & Levels of Kicker (Inside) of Span 28 & 29 for boundary wall of Water Garden, as per hi
Excavation for FOUL WATER Line from (FW14 to FW16) Prior Gravel Bedding Includes the manhole
Pipe installation for STORM WATER LINE-OUT FALL ( 800mmØ- CORRUGATED pipe upvc. Class 4) 26M l
Bedding of Gravel 3/8" and Geotextile surrounding in pipes 800mm Ø) for STORM WATER LINE-OUT F
Pipe installation for STORM WATER LINE-OUT FALL ( 450mmØ- upvc. Class 4) 60M length as per high
WARNING TAPE Installation for STORM WATER Line- OUT FALL (MH-X-01 to MH-X-01-1)
Backfilling of Gravel 3/8"( 300mm thk)above the pipes (400mm dia. Upvc class 4) for STORM WATER
Excavation for Storm Water Line from (G-X-7 to MH-X-01-1) Prior Gravel Bedding Includes (G-X-7).
MOCK UP of FIRST FIX water supply (copper pipes 1/2") with rubber insulation INSIDE WALL as per ap
Surface preparation of Blinding prior to Water proofing Under Columns at Grid (5/3 & 3') (4/A & E) (5/
Excavation & Bed preparation for Sub Surface Branch Drain Pipe (110mm & 160mm Part 2) Inside Plan
Excavation & Bed preparation for Sub Surface Main Drain Pipe (250mm, 200mm & 160mm Part 2) @ Pla
Inspection of 9 layers Block work of 250mm thk (100mm wall, 50mm Cavity & 100mm wall) at Grid 6/A
Surface preparation of Blinding prior to Water proofing Under Columns at Grid (4/A) (1/B,C,& D) (2/E)
Level & Location for BIV-115 Zone 2N (as highlighted)
Concrete pouring for Blinding of boundary wall Span 40, 41 & 42 of Water Garden, as per highlighte
Concreting for Buttress BIV 115 top of PC to Bottom of Ring beam
Surface Preparation prior to Stone Cladding for boundary wall (Inner face) @ span 7, 8, 9, 10 & 11 @
Inspection After Removal of old crescents monument Beside Boundary wall Span 38, Near Entrance
Shuttering for Buttress BIV 115 top of PC to Bottom of Ring beam
Surface preparation prior to water proofing for Foundation of Boundary wall (Inner Face) @ Grid (1-1
Solvent Base Primer prior to water proofing membrane for Foundation of Boundary wall (Inner Face) @
Surface Preparation prior to waterproofing for Boundary wall Foundation (Inner & Outer Faces) of S
Installation of Box and UPVC straight conduit (Dia.25mm) for External Lighting at the Maintenance & M
Base Primer Coating (50% x 50% bitumin and water for 5 internal Foundation at Zone 2C (as Highlighted
Stone Cladding for Columns of Boundary wall @ C42, C43, C44 & C45 (All Sides), As per Attached High
Installation of Stone Cladding for Concrete Boundary Wall outer face - up to wall level;Column #42-48
Pipe Installation of STORM WATER Line-OutFall-A for (400mmØ-UPVC- Class 4 ) for 58 m Length & (3
GRAVEL BEDDING and Geotextile Surronding Storm Water Line- Outfall A for (400mmØ-UPVC- Class 4)
'Pipe Installation of STORM WATER Line-OutFall-A for (400mmØ-UPVC- Class 4 ) for 30 m Length fro
GRAVEL BEDDING and Geotextile Surronding Storm Water Line- Outfall A for (400mmØ-UPVC- Class 4)
Concrete pouring & Shuttering for Kicker (Inside) for boundary wall Span 37 & 39 of Water Garden, a
Concrete pouring & Shuttering for Kicker (Outside) for boundary wall Span 38 of Water Garden, as pe
Rectified the Concrete Masonry units which were damaged Due to MEP works Refer to NCR# KAIG3-
Concrete pouring for Blinding of Light wall (G & F) at Sound & Light Garden, At highlighted area in at
Coordinates & Top levels of Blinding of Light walls (G & F) at Sound & Light Garden, At highlighted ar
Excavation & Surface Preparation prior to blinding of Light walls (G & F) at Sound & Light Garden, At
Steel Reinforcement for Footing & Kicker of Boundary wall for Span 26 & 27 of Water Garden, as per
Concrete pouring & Shuttering for Pedestal (Column's 05 no's @ Grids B / 1, 2 & 3 and A / 1 & 2) of
Installation of Cladding for Prayer Area (1) at Zone-B
Completion of Rock Boulder No.RB- 295 with Grouting
Inspection for Excavation and Bedding Prepration at Plaza area as per Highlighted
Inspection for Excavation and Bedding Prepration at Plaza area as per Highlighted
Inspection of Spatter Dash (Rough Coat) & Plaster Guide Point and plaster accessories prior to start
Inspection of Spatter Dash (Rough Coat) prior to start Internal Plastering at Grid between (10-13/B-D)
Completion of Rock Boulder No. RB- 67 with Grouting
Installation of Rock and Boulder No. RB-295 (6th Layer)
Protection Layer of Geo-textile sheet and screed under Strip footing in Zone 2Q (as Highlighted)
Protection Layer of Geo-textile Sheet and Screed under PC 17, 25 to 32 Zone 1E 1D & 1C (as Highlighted
Protection Layer of Geo-textile sheet and Screed Protection Under Pile Cap (PC 90, 89) as Hihglighted
Solvent Base Primer Coating for Pile Cap (PC 167, 169, 171, 173) as highlighted
Solvent base primer coating for Pile Cap at Zone 2N (PC 175 to 182)
Steel Reinforcement for Retaining wall (wall) At Axis AB to Z (as Highlighted)
2 Coats of Bituminous Damp Proofing-coating for 5 internal Foundation at Zone 2C (as Highlighted)
Steel Reinforcement for BIV-BII 64 & BB125 for Zone 2B (as Highlighted)
Installation of UPVC conduit Fire & Security Duct Bank (Dia.:110mm BB/D-FS/12) for Low Current at t
Inspection of Plaster Guide Point and plaster accessories prior to start Spatter Dash (Rough Coat) for
Protection layer 4mm thk Bituminous protection board for boundary wall Foundation (Inner Face) @ Sp
Concrete Pouring & Shuttering for Wall of Span 30 for boundary wall of Water Garden, as per highli
Installation of UPVC conduit TELECOM Duct Bank (Dia.:110mm BB/D-TL/12) for Low Current at the Wat
Coordinates & Levels of Wall of Span 30 for boundary wall of Water Garden, as per highlighted Atta
Steel Reinforcement for Wall & Buttress @ Grid 29 to 33 or (18-22/Left Side), of Boundary wall at Avi
Installation of UPVC conduit LV Ductbank (Dia.160mm BB/D-LV/10) for Power at the Water Garden as pe
Stone Cladding for Column's of Boundary wall @ Column No. C80, C81, & C82 (All Sides), As per Attac
Concrete pouring & Shuttering of Footing of Span 28 & 29 for boundary wall of Water Garden, as per
Coordinates & Levels of Footing of Span 28 & 29 for boundary wall of Water Garden, as per highligh
Steel Reinforcement for Footing & Kicker of Span 28 & 29 for boundary wall of Water Garden, as per
Geo Textile on Blinding under Seat wall (B, D, E & F) and Light wall (A & B) at Sound & Light Garden,
Protection layer 4mm thk Bituminous protection board (Both sides 500mm wide) on Blinding under Seat
2nd Coat Cementitious Water Proofing on Blinding under Seat wall (B, D, E & F) and Light wall (A & B)
Single layer 4mm thk Modified Bituminous Water Proofing Membrane (Both sides 500mm wide) on Blindi
Excavation for Storm Water Line from (MH-A-2 to MH-A-3) Prior Gravel Bedding Includes ( MH-A-3).
Excavation for Storm Water Line from (MH-A-8 to MH-A-9) Prior Gravel Bedding Includes ( MH-A-9).
Installation of Rock and Boulder No. RB-295 (5th Layer)
Installation of Rock and Boulder No. RB-68 (5th Layer)
Installation of Cladding for Prayer Area (1) at Zone-B
Notification to start Cutting and Removing of The Highlight area in Drawing up to Level Finishing
Steel Reinforcement for Buttress BIV-BII 116 (1st)
Steel Reinforcement for Buttress BIV-BII 117 (1st)
Steel Reinforcement for Buttress BIV-BII 113 (1st)
Installation of stub-up PVC conduit for Lighting (Power-Dia.50mm 2pcs& Grounding - Dia.32mm 1pc. Ea
Steel Reinforcement for Buttress BIV-BII 114 (1st)
Steel Reinforcement for Buttress BIV-BII 115 (1st)
Surface Preparation Prior to start Backfilling for Zone 2C (as Highlighted) Axis 02-J to 02-G
Notification to start Backfilling for Zone 2C (as Highlighted) Axis 02-J to 02-G
2 Layer of 4mm thick Modified Bituminous WP membrane Under Foundation for MCPE Zone 2G 2nd and
Protection layer of Geotextile and Screed for Under foundation of MCPE 2E & 2F (as Highlighted)
Installation of stub-up PVC conduit 75mm for Low Current System Junction Box at the New Ticket Booth
Installation of stub-up PVC conduit 75mm for Low Current System Junction Box at the New Ticket Booth
Installation of sleeve PVC conduit 32mm (2Pcs.) for grounding at New Ticket Booth # 1A ground floor l
GRAVEL BEDDING and Geotextile Surronding Storm Water Line- Outfall X for (450mmØ-UPVC- Class 4)
Excavation for Foul Water Line from (FW6 to FCO) Prior Gravel Bedding.
Installation of earthing clamps with conductor 70mm² (2pcs.) for earthing reinforcement steel re-bar
Installation of sleeve PVC conduit 50mm (1Pc.) for Barrier Gate Control at New Ticket Booth # 1A ground
Installation of sleeve PVC conduit 160mm (1Pc.) for LV incoming Power Supply at New Ticket Booth # 1
Installation of stub-up PVC conduit 32mm (2Pcs.) for grounding at New Ticket Booth # 2A ground floor l
Installation of earthing clamps with conductor 70mm² (2pcs.) for earthing reinforcement steel re-bar
Installation of sleeve PVC conduit 50mm (1Pc.) for Barrier Gate Control at New Ticket Booth # 2A ground
Installation of sleeve PVC conduit 160mm (1Pc.) for LV Incoming Power Supply at New Ticket Booth # 2A
Installation of straight UPVC conduit (Dia.32mm 2Pcs. Each Socket Outlet) and Box for Power at the Cre
Installation of straight UPVC conduit (Dia.32mm 2Pcs. Each F1/CE & F2 ) and Box for Lighting (Flood Ligh
Installation of earthing clamps with conductor 70mm for earthing reinforcement steel re-bar at Cresce
Installation of straight UPVC conduit (Dia. 25mm: 2Pcs each CCTV &WIFI) and Box for Voice and Data at
Installation of straight UPVC conduit (Dia. 25mm: CCTV) and Box for Security at the Crescent-02 (Axis 0
Installation of straight UPVC conduit (Dia. 25mm: 2Pcs each Speaker) and Box for Fire Alarm at the Cr
Installation of Rock and Boulder No. RB-295 (4th Layer)
Completion of Rock Boulder No. RB- 65 with Grouting
Completion of Rock Boulder No. RB- 285 with Grouting
Soil Preperation prior to start backfilling Sub-Grade of Seating Area (2) (SA-28) (Inside+outside A
'Pipe Installation of STORM WATER Line-OutFall-A for (450mmØ-UPVC- Class 4 ) for 29 m Length & (
Pipe Installation of STORM WATER Line - Outfall X for (400mmØ-UPVC- Class 4) 40 m Length from (MH
Soil Preperation prior to start backfilling Sub-Grade of Seating Area (3) (SA-22) (Inside+outside A
Excavation for Storm Water Line from (MH-A-7 to MH-A-8) Prior Gravel Bedding Includes (MH-A-7 &
Soil Preperation prior to start backfilling Sub-Grade of Seating Area (1) (SA-10) (Inside+outside A
Excavation for Storm Water Line from (MH-A-14 to MH-A-15) Prior Gravel Bedding Includes (MH-A-1
Shuttering and Concreting For 2nd Layer Mass/Plain Concrete under Strip Footing at Zone 2C (as Highli
Concrete pouring of Blinding of Columns at Grid (5/3 & 3') (5/4 & 4') & (5/A, B, C, D & E) along the Re
Concrete pouring of Blinding of Columns at Grid (4/A) (1/B,C,& D) (2/E) & (4/F) along the Retaining wa
Coordinates & Top level of Blinding of Columns at Grid (5/3 & 3') (5/4 & 4') & (5/A, B, C, D & E) along
Coordinates & Top level of Blinding of Columns at Grid (4/A) (1/B,C,& D) (2/E) & (4/F) along the Retai
Steel Reinforcement for Wall of Span 30 for boundary wall of Water Garden, as per highlighted Atta
Soil Preparation prior to Backfill along the Boundary Wall (Inner Side) of Span 3, 4, 5 & 6 at Water G
Stone Cladding for Column's of Boundary wall @ Column No. C77, C78, & C79 (All Sides), As per Attac
1st Coat Cementitious Water Proofing on Blinding under Seat wall (B, D, E & F) and Light wall (A & B)
Solvent Base Primer Coating (Both sides 500mm wide) for Blinding prior to Water proofing under Seat w
Surface preparation prior to Waterproofing on Blinding of Seat wall (B, D, E & F) and Light wall (A &
Excavation & Surface preparation at 1st layer of Stone Boulders (Part 1) Inside Water Garden, At Hig
Inspection to Check Protection Layer of Geotextile sheet for Strip Footing between PC (99 to 101).
Blinding Concrete for Foundation in Tunnel 2 Crescent Zone 6
Probing and Grouting Works at Zone 1D, (164 Points)
Probing and Grouting Works at Zone 1F, 98 Points
Level & Location For 2nd Layer Mass/Plain Concrete under Strip Footing at Zone 2C (as Highlighted) Be
Level & Location For Mid Section embossed Blinding for MCPE Zone 2H (axis 02-AA to 02-Z) as Highlight
Excavation of Storm Water Line from (MH-A-10 to MH-A-02) Prior Gravel Bedding Includes MH-A-02.
'Pipe Installation of STORM WATER Line-OutFall-A for (450mmØ-UPVC- Class 4 ) for 28 m Length & (
Coordinates & top levels of Blinding of boundary wall at Span 40, 41 & 42 of Water Garden, as per h
Excavation & Surface Preparation after the Backfilling upto Bottom of blinding of boundary wall at s
4th layers of Stack Boulders wall Installed at Planted bed of Boat Garden, at highlighted area in att
Co-ordinates & Top level of Pedestal Beam for New Ticket booths # 1A & 2A, as per highlighted attac
Concrete Pouring & Shuttering for wall of Span 35, 36 & 37 for boundary wall of Water Garden, as pe
Coordinates & levels for wall of Span 35, 36 & 37 for boundary wall of Water Garden, as per highligh
Installation of Rock and Boulder No. RB-295 (3rd Layer)
Installation of Rock and Boulder No. RB-65 (8th Layer)
Inspection of concrete pouring for the Wall of Seating Area (1) at Zone-K (SA-14) As Highlighted
Shuttering and Concreting for Blinding of Internal Buildings at Zone 2Q & 2R (as Highlighted)
Application of Anti Termite under Blinding for Internal Buildings at Zone 2Q & 2R (as Highlighted)
Level and Location of Blinding for Internal Buildings for Zone 2Q and 2R (as Highlighted)
2 Layer of 4mm thk Modified Bituminous WP membrane for Under foundation of MCPE 2E & 2F (as High
Installation of Rock and Boulder No. RB-115-A (First Layer)
Installation of Rock and Boulder No. RB-68 (4rd Layer)
Completion of Rock Boulder No. RB- 65a with Grouting
Surface preparation prior to water proofing for Foundation of Boundary wall (Inner Face) @ Grid (1-17
Existing levels Prior to Remove Soil at Base of Boundary wall span 43, 44, 45, 46, 47, 48 & 49 in Wat
Stone Cladding for Column's of Boundary wall @ Column No. C69, C70 & C71 (All Sides), As per Attac
Stone Cladding for Column's of Boundary wall @ Column No. C59, C60A, C60B, C61A, C61B & C61C (All
Protection Board for Pedestal (Column's Surround) 05 no's @ Grids (A/1 & 2) & (B/1, 2 & 3) @Ticket
Inspection of Six layer Block work of 250mm thk (100mm wall, 50mm Cavity & 100mm wall) at Grid 6/
Inspection of First layer Block layout of 250mm thk (100mm wall, 50mm Cavity & 100mm wall) at Grid
Existing levels prior to start Excavation for Stone Boulders (Part 1) at Geyser Garden in Water Garden
Stone Cladding for Column's of Boundary wall @ Column No. C2, C3, C4 & C5 (All Sides), As per Attac
Stone Cladding for Boundary wall @ Span 69 (Inner Face), As per Attached Highlighted Drawing's.
Steel Reinforcement for Buttress BOV-BOI 115 (1st)
Single Layer of 4mm thick modified Bituminous Water Proofing Membrane of Zone 2N Between Axis 02-2
One Layer of 4mm thick Modified Bituminous WP mwmbrane for joints only (200m x 200m) of Zone 2N B
Filler Board, Backing Rod and Sealant of Zone 2N Between Axis 02-2, 02-AT to 02-AR (as Highlighted)
Steel Reinforcement Implant using Approved Material (KAIG3-MAT-GN-S-0099-00) for BOI-64 (as Highli
Stone Cladding for Columns of Boundary wall @ Column No. C24, C24A, C25 & C26 (All Sides), As per
Base Primer Coating (50% x 50% Bitumin & Water) for Under foundation of MCPE 2E & 2F (as Highlighte
Surface Preparation prior to start Water Proofing for Under foundation of MCPE 2E & 2F (as Highlighted
Protection layer of Geo-textile sheet and 50mm Screed above blinding of Tunnel 2 (as Highlighted)
'Pipe Installation of Storm Water Line- Outfall A for (800mmØ-PP- Corrugated) from (MH-A-10 to MH-
SURFACE PREPARATION Prior to Start Backfilling Under Pipe for Storm Water Line from (MH-A-15 to
'Pipe Installation of STORM WATER Line - Outfall X for (450mmØ-UPVC- Class 4) from (Outfall X to MH
'Pipe Installation of STORM WATER Line-OutFall-B for (450mmØ-UPVC- Class 4 ) for 36 m Length & (3
'GRAVEL BEDDING and Geotextile Surronding Storm Water Line- Outfall B for (450mmØ-UPVC- Class 4)
GRAVEL BEDDING and Geotextile Surronding Storm Water Line- Outfall A for (450mmØ-UPVC- Class 4)
Inspection of surface preparation prior to water pfoofing for pile caps (86-88)
Inspection for application of water proofing for Mock-up
Surface preparation and primer prior to application of water proofing (Mock-up)
WARNING TAPE Installation for Foul Water Line (110mmØ-UPVC-CLASS 4) from (FW1-2 to Warehouse).
'GRAVEL BEDDING and Geotextile Surronding Storm Water Line- Outfall X for (400mmØ-UPVC- Class 4)
GRAVEL BEDDING and Geotextile Surronding Storm Water Line- Outfall X for (450mmØ-UPVC- Class 4) f
'GRAVEL BEDDING and Geotextile Surronding Storm Water Line- Outfall A for (450mmØ-UPVC- Class 4
Concrete pouring for Blinding of Seat wall (B, D, E & F) & Light wall (A to H) at Sound & Light Garden,
GRAVEL BEDDING and Geotextile Surronding Storm Water Line- Outfall A for (800mmØ-PP- Corrugated
Geo Textile for Blinding under boundary wall @ span 26, 27, 28 & 29 of Water Garden, as per highli
Protection Layer 4mm thk. Bituminous Protection Board for Blinding under boundary wall @ span 26,
Single Layer Water proofing membrane 4mm thk. (Both sides 500mm wide) for Blinding under boundar
Steel Reinforcement for Footing & Kicker of Boundary wall (C & I) at Sound & Light Garden, At highlig
Steel Reinforcement for wall of Span 35 for boundary wall of Water Garden, as per highlighted Attac
Concrete pouring & Shuttering for Wall @ Grid 24 to 30 or (21-23/Left Side & 23/Right Side), of Bound
Coordinates, levels & Alignment for Wall @ Grid 24 to 30 or (21-23/Left Side & 23/Right Side), of Bou
Soil Preparation under Boulder No.RB- 296
Inspection for Concrete encasment formwork of Manhole Pipe connection for Storm Water at Zone-1 A
Installation of Rock and Boulder No. RB-115 (3rd Layer)
Installation of Rock and Boulder No. RB-65 (7th Layer)
Installation of Rock and Boulder No. RB-115 (2nd Layer)
Completion of Rock Boulder No. RB- 66 with Grouting
Completion of Rock Boulder No. RB- 326a with Grouting
Surface Preparation prior to start Backfilling for Tunnel 1 Above slab (mid section to near MCPE 2) as hi
Notification to start Backfilling for Tunnel 1 Above slab (mid section to near MCPE 2) as highlighted
Steel Reinforcement for Buttress BOV-BOI 114 (1st)
Surface Preparation prior to start Backfilling for Zone 2Q (as Highlighted) Axis 02-AZ to 02-AW
Notification to start Backfilling for Zone 2Q (as Highlighted) Axis 02-AZ to 02-AW
Base Primer Coating 50% x 50% Bitumin and water Under Foundation for MCPE Zone 2G 2nd and 3rd Mo
Surface Preparation prior to start Water Proofing Under Foundation for MCPE Zone 2G 2nd and 3rd Mov
Installation of Box and UPVC straight conduit (Dia.25mm) for Power (13A Cleaner Socket WP,13A
2nd Coat Damp proofing for Pedestal (Column's Surround) 05 no's @ Grids (A/1 & 2) & (B/1, 2 & 3)
Installation of Box and UPVC straight conduit (Dia.25mm) for Power (WP 13A Cleaner Socket,Trun
1st Coat Damp proofing for Pedestal (Column's Surround) 05 no's @ Grids (A/1 & 2) & (B/1, 2 & 3) @
Primer coat Prior to Damp Proofing for Pedestal (Column's Surround) 05 no's @ Grids (A/1 & 2) & (B/
Soil preparation prior to Backfilling for column foundation at Grid (5/3 & 3') (5/4 & 4') & (5/A, B, C,
Soil preparation prior to Backfilling for column foundation at Grid (4/A) (1/B,C,& D) (2/E) & (4/F) @ J
2nd Coat Damp proofing for Boundary wall Foundation (Inner Face) @ Span 24, 25, 26, 27, 28, 29 & 30
1st Coat Damp proofing for Boundary wall Foundation (Inner Face) @ Span 24, 25, 26, 27, 28, 29 & 30,
Primer coat Prior Damp proofing for Boundary wall Foundation (Inner Face) @ Span 24, 25, 26, 27, 28,
Installation of Rock and Boulder No. RB-295 (2nd Layer)
Coordinates & Top levels of Blinding of Seat walls & Light walls at Sound & Light Garden, At highlight
Excavation & Surface Preparation for foundation of Seat walls & Light walls at Sound & Light Garden,
Concrete Pouring & Shuttering for wall of Span 33 & 34 for boundary wall of Water Garden, as per hi
Coordinates & levels for wall of Span 33 & 34 for boundary wall of Water Garden, as per highlighted
Steel Reinforcement for wall of Span 36 & 37 for boundary wall of Water Garden, as per highlighted
2nd Coat Cementitious Water Proofing for Blinding under boundary wall @ Span 26, 27, 28 & 29 of W
1st Coat Cementitious Water Proofing for Blinding under boundary wall @ Span 26, 27, 28 & 29 of Wa
Solvent Base Primer Coating (Both sides 500mm wide) for Blinding prior to Water proofing under bou
Surface Preparation prior to waterproofing on Blinding of boundary wall Span 26, 27, 28 & 29 of Wat
Stone Cladding for Column of Boundary wall @ Column No. C19 (All Sides), As per Attached Highlight
Stone Cladding for Boundary wall (Inner Face) @ Grid (EXC1-05 to EXC3-10) at Physic Garden at highl
Concrete pouring for Blinding of boundary wall Span 26, 27, 28 & 29 of Water Garden, as per highlig
Coordinates & Top Level of Pedestal (Column's 05 no's @ Grids B / 1, 2 & 3 and A / 1 & 2) & Anchor
Base Primer Coating (50% x 50% bitumin and water for 5 internal Foundation at Zone 2C (as Highlighted
Surface Preparation prior to start Water Proofing for 5 internal Foundation at Zone 2C (as Highlighted)
Shuttering and Concreting of Blinding for MCPE Foundation at Zone 2G, 2H, 2J, 2K (as Highlighted)
Application of Anti Termite Under Blinding for MCPE Foundation at Zone 2G, 2H, 2J, 2K (as Highlighted)
Level and Location of Blinding for MCPE Foundation at Zone 2G, 2H, 2J, 2K (as Highlighted)
Level, Coordinates for Top of Blinding for Retaining wall Axis 01S to 01P
Level, Location of Plain Concrete below foundation in Administation Building Axis G toH Zone 7 (as Highl
Level Location for Rock Level in Admin BLDG. Zone 7
Level & Location of Concrete for Strip Footing at TIP zone 1P
Level, Coordinates of Column for Colonnades 3 Foundations (as Highlighted)
Level, Location of 1st layer (backfill) in Administation Building Axis G to J Zone 7
Shuttering and Concreting for Strip Footing at TIP Zone 1P (as highlighted)
Installation of stub-up UPVC conduit (Dia. 32mm 2 pcs. Each Fused Connection Unit Unswitched 230V
Installation of Rock and Boulder No. RB-326a (4th Layer)
Inspection of concrete pouring for the Wall of Seating Area (1) at Zone-K (SA-17) As Highlighted
Inspection of Formwork for the Wall of Seating Area (1) at Zone-K (SA-14) As Highlighted
Steel Reinforcement for Strip Footing at TIP Zone 1P (as highlighted)
Solvent Base Primer Coating for Strip Footing of Zone 2N Between Axis 02-2, 02-AT to 02-AR (as Highlig
Surface Preparation Prior to start Waterproofing for Strip Footing of Zone 2N Between Axis 02-2, 02-AT
Concreting of Column/Buttress for PC 185 Axis 02 AV
Concreting for Retaining wall Kicker At Axis AD to AF (as Highlighted)
Shuttering for Retaining wall Kicker At Axis AD to AF (as Highlighted)
Inspection to check surface preparation prior to start water proofing for retaining wall foundation cres
Inspection to check mass concrete SRC C(16-20) 45 cm from the wall footing foundation width(+ or - 60
Pipe installation of STORM Water Line- OutFall - A for (600mmØ-PP Corrugated Pipe ) from (MH-A-11
PIPE INSTALLATION of Foul Water Line for (160mmØ-UPVC-CLASS 4) from (FW1-2 to FW1-3). At highli
Steel Reinforcement for Buttress BIV-BII 113 (1st)
GRAVEL BEDDING and Geotextile Surronding Foul Water Line for (160mmØ-UPVC-CLASS 4) from (FW1-2
Excavation of Storm Water Line from (FW6 to FCO) Prior Gravel Bedding.
Excavation of Storm Water Line from (MH-X-01 to MH-X-02) Prior Gravel Bedding.
Steel Reinforcement for Buttress BIV-BII 114 (1st)
Steel Reinforcement for Buttress BIV-BII 115 (1st)
Soil Preparation under Boulder No.RB- 154
Installation of Rock and Boulder No. RB-65 (6th Layer)
Installation of Rock and Boulder No. RB-68 (3rd Layer)
Installation of Rock and Boulder No. RB-326a (3rd Layer)
Installation of Rock and Boulder No. RB-115 (1st Layer)
Steel Reinforcement for wall of Span 33 & 34 for boundary wall of Water Garden, as per highlighted
Inspection of Plaster Guide Point and plaster accessories prior to start Spatter Dash (Rough Coat) for
Concrete Pouring & Shuttering for wall of Span 38 & 39 for boundary wall of Water Garden, as per hi
Coordinates & levels for wall of Span 38 & 39 for boundary wall of Water Garden, as per highlighted
Stone Cladding for Columns of Boundary wall @ Column No. C31, C32, C33 & C34 (All Sides), As per A
Stone Cladding for Boundary wall @ Span 5, 6 & 7 (Outer Face) at Water Garden, as per Attached Dr
Steel Reinforcement for Buttress BIV-BII 117 (1st)
Steel Reinforcement for Buttress BIV-BII 116 (1st)
Single layer of 4mm thk modified bituminous WP membrane for Pile Cap 168, 169, 170, 171, 172, 173, 1
Level & Location For 1st Layer Mass/Plain Concrete under Strip Footing at Zone 2C (as Highlighted) Bet
Shuttering For 1st Layer Mass/Plain Concrete under Strip Footing at Zone 2C (as Highlighted) Between Ax
Sealant and Backing Rod for joints only under Strip footing and PC in Zone 2Q (as Highlighted)
1 layer of 4mm thk modified bituminous WP membrane for joints only under Strip footing and PC in Zon
Installation of straight UPVC conduit (Dia. 25mm: 2Pcs each CCTV &WIFI) and Box for Voice and Data a
Protection Layer of Geo-textile sheet and screed under Strip footing in Zone 2Q (as Highlighted)
Installation of straight UPVC conduit (Dia. 25mm: 2Pcs each CCTV) and Box for Security at the Crescen
Single Layer of 4mm thk modified bituminous WP membrane under Strip footing in Zone 2Q (as Highligh
Installation of straight UPVC conduit (Dia. 25mm: 2Pcs each Speaker) amd Box for Fire Alarm at the
Solvent Base Primer Coating under Strip footing in Zone 2Q (as Highlighted)
Surface Preparation Prior to start Waterproofing under Strip footing in Zone 2Q (as Highlighted)
Installation of stub-up UPVC conduit (Dia. 25mm: 2Pcs each Speaker ) for Fire Alarm at the Sound and
Installation of stub-up UPVC conduit (Dia. 25mm: 2Pcs each CAM ) for Security at the Sound and Light
Installation of stub-up UPVC conduit (Dia. 25mm: 2Pcs each WIFI,CAM,E-Ticket,Data Outlet &TELECOM )
Installation of earthing clamps with conductor 70mm (3pcs.) for earthing reinforcement steel re-bar a
Fire dampers and access doors sample Installation at Management Bldg. ; as per high lighted in dwg.
Soil Preparation under Boulder No.RB- 296
Completion of Rock Boulder No.RB- 262 with Grouting
Completion of Rock Boulder No.RB- 112 with Grouting
Installation of Rock and Boulder No. RB-65 (5th Layer)
Completion of Rock Boulder No.RB- 286 with Grouting
Steel Reinforcement for Wall @ Grid 24 to 30 or (21-23/Left Side & 23/Right Side), of Boundary wall a
Coordinates & levels of Blinding for boundary wall Span 26, 27, 28 & 29 of Water Garden, as per hig
Excavation & Surface Preparation for foundation of boundary wall @ span 26, 27, 28 & 29 @ Water Ga
Steel Reinforcement for wall of Span 38 for boundary wall of Water Garden, as per highlighted Attac
Steel Reinforcement for Footing & Kicker of Boundary wall (B) at Sound & Light Garden, At highlighte
Level, Location of 5 Internal Foundation at Zone 2C (as Highlighted)
Level, Location of Strip Footing Excavation at Zone 2C (as Highlighted)
Shuttering and Concreting for 5 internal Foundation at Zone 2C (as Highlighted)
Steel Reinforcement for 5 internal Foundation at Zone 2C (as Highlighted)
Protection layer of 4mm thk bituminous protection board for Pile Cap PC-177, 179, 181 (as Highlighted)
Single Layer of 4mm thk Modified bituminous WP membrane for Pile Cap PC-177, 179, 181 (as Highlight
Coordinates & Level for Footing of Boundary wall (A, B, G & H) at Sound & Light Garden, At highlight
Solvent Base Primer Coating for Pile Cap PC-177, 179, 181 (as Highlighted)
Surface Preparation Prior to start Waterproofing for Pile Cap PC-177, 179, 181 (as Highlighted)
Protection layer of 4mm thk Bituminous Protection Board above blinding of Tunnel 2 (as Highlighted)
Protection layer of Geo-textile sheet and Screed of Slab (Near MCPE) for Tunnel 1 (as Highlighted)
Protection layer of Geo-textile sheet and Screed of Slab (Mid) for Tunnel 1 (as Highlighted)
Protection layer of 4mm THK Bituminous Protection Board of Slab (Mid) for Tunnel 1 (as Highlighted)
Notification start Backfilling for Zone 2R (as Highlighted)
Application of Protection Layer of geotextile sheet 180 gr. Per sqm and screed Below Foundation PC 117
Application of Protection Layer of geotextile sheet 180 gr. Per sqm and screed Below Foundation PC 109
Notification start Construction of South Administration Building (as Highlighted) Zone 2C
Surface Preparation prior to start Backfilling at South Administration Building (as Highlighted) Zone 2C
Protection layer of 4mm THK Bituminous Protection Board under PC 165 & 166 Zone 2M (as Highlighted
Protection layer of Geo-Textile Sheet and Screed under PC 165 & 166 Zone 2M (as Highlighted)
Single Layer of 4mm THK modified bituminous WP membrane under PC 165 & 166 Zone 2M (as Highligh
Solvent Base Primer Coating under PC 165 & 166 Zone 2M (as Highlighted)
Surface Preparation Prior to Start Water Proofing under PC 165 & 166 Zone 2M (as Highlighted)
Protection Layer of 4mm thk Bituminous Protection Board under PC 17, 23 to 32 Zone 1E 1D & 1C (as Hi
Protection Layer of Geo-textile Sheet and Screed under PC 17, 23 to 32 Zone 1E 1D & 1C (as Highlighted
Single Layer of 4mm THK Modified Bituminous WP Membrane under PC 17, 23 to 32 Zone 1E 1D & 1C (as
Solvent Base Primer Coating under PC 17, 23 to 32 Zone 1E 1D & 1C (as Highlighted)
Surface Preparation Prior to Start Water Proofing under PC 17, 23 to 32 Zone 1E 1D & 1C (as Highlighted
Installation of Box and UPVC straight conduit (Dia.25mm) for Power (WP 13A Cleaner Socket,Trunk
Installation of Box and UPVC straight conduit (Dia.25mm) for Power (13A Cleaner Socket,Trunk M
Installation of Rock and Boulder No. RB-295 (1st Layer)
Installation of Rock and Boulder No. RB-326a (2nd Layer)
Soil Preperation prior to start backfilling Sub-Grade of Seating Area (1) (SA-13) (Inside+outside Area) - A
Level, Location of 2 Foundation in North Admin Building (as Highlighted) Zone 2Q
Surface Preparation prior to start Backfilling for TIP (Zone 2A) Internal and External
Shuttering and Concreting for 2 Foundation of Internal Bldg. in Zone 2Q ( as Highlighted)
Steel Reinforcement for 2 Foundation of Internal Bldg. in Zone 2Q ( as Highlighted)
Notification to start Backfilling for Crescent 2 for PC 186 to 183 (as highlighted)
Inspection to Check Protection Layer of Geotextile Sheet and Protection Screed for Strip Footing Betwee
Inspection to Check Protection Layer of Geotextile Sheet and Protection Screed for Strip Footing Betwee
Inspection of Concrete Casting SRC, C(16-20) at Shearkey Blinding for PC(143,141,139,137,135,133,131
Inspection of Anti Termite Prior to Casting blinding concrete for Shearkey PC (163,161,159,157,155,15
Level, Location of Strip Footing (foundation) for Zone 2N Between Axis 02-2, 02AT to 02AR asn highlight
Steel Reinforcement for Footing & Kicker of Boundary wall (A, G & H) at Sound & Light Garden, At hi
Geo Textile on Blinding under boundary wall (F) at Sound & Light Garden, At highlighted area in atta
Protection layer 4mm thk Bituminous protection board (Both sides 500mm wide) on Blinding under bou
Single layer 4mm thk Modified Bituminous Water Proofing Membrane (Both sides 500mm wide) on Blind
Top Level of Thickening of Slab at Grid (6/A-E) in Management Building, as highlighted in attached Dr
Concrete Pouring for Thickening of Slab at Grid (6/A-E) in Management Building, as highlighted in at
Steel Reinforcement for Thickening of Slab at Grid (6/A-E) in Management Building, as highlighted in
Soil Preparation prior to Backfill along the Boundary Wall (Outer Side) of Span 1, 3, 4, 5 & 6 at Wate
Existing levels at Base After Removal of Loose Soil at Boundary Wall Span 26, 27, 28 & 29 @ Water Ga
Completion of Rock Boulder No.RB- 302 with Grouting
Installation of Rock and Boulder No. RB-68 (2nd Layer)
'GRAVEL BEDDING and Geotextile Surronding Storm Water Line- Outfall A for (450mmØ-UPVC-CLASS 4)
WARNING TAPE Installation for Foul Water Line (160mmØ-UPVC-CLASS 4) from (FW1-2 to FW1-2.3). As
WARNING TAPE Installation for Foul Water Line (160mmØ-UPVC-CLASS 4) from (FW12 to FW14). As pe
'GRAVEL BEDDING and Geotextile Surronding Storm Water Line- Outfall X for (450mmØ-UPVC-CLASS 4)
xcavation of Storm Water Line from (MH-X-01 to MH-X-01-1) Prior Gravel Bedding Includes MH-X-1-1
Excavation of Storm Water Line from (MH-A-13 to MH-A-14) Prior Gravel Bedding Includes MH-A-14.
Excavation of Storm Water Line from (Concrete Encasment Point to MH-A-10) Prior Gravel Bedding I
WARNING TAPE Installation for Foul Water Line (160mmØ-UPVC-CLASS 4) from (FW6-1 to FW6-3). As p
Stone Cladding for Columns of Boundary wall @ Column No. C45, C46 & C47 (All Sides), As per Attach
Stone Cladding for Columns of Boundary wall @ Column No. C42, C43 & C44 (All Sides), As per Attach
2nd Coat Cementitious Water Proofing for Blinding under boundary wall (F) at Sound & Light Garden,
1st Coat Cementitious Water Proofing for Blinding under boundary wall (F) at Sound & Light Garden, A
Solvent Base Primer Coating (Both sides 500mm wide) for Blinding prior to Water proofing under boun
Surface preparation prior to Waterproofing on Blinding of Boundary wall (F) at Sound & Light Garden,
Stone Cladding for Boundary wall Inner Face @ Span 2, 3, 4 & 5, As per Attached Highlighted Drawing
Protection Layer of4mm THK Bituminous Protection Board in Colonnades Foundation at Zone 2P (as High
Steel Reinforcement for Buttress BOV-BOI 113 (1st)
Protective Layer of 4mm THK Bituminous Protection Board of Foundation for internal building at zone 2
Two Coats of Bituminous Damp Proofing-Coating of Foundation for internal building at zone 2Q (as H
Installation of Rock and Boulder No. RB-274 (2,3,4 Layers)
Installation of Rock and Boulder No. RB-286 (4,5 th Layers)
Installation of Rock and Boulder No. RB-65a (4th Layer)
Installation of Rock and Boulder No. RB-66 ( 4th Layer)
Installation of Rock and Boulder No. RB-067 (5th Layer)
Level, Location of Blinding for MCPE 3 at Zone 2E & 2F (as Highlighted)
Level, Location of 5 Bliding under foundation in South Administation Building (as Highlighted) Zone 2C
Solvent Base Primer Coating for Pile Cap 168, 170, 172, 174 (foundation)
Surface Preparation Prior to start Water Proofing for Pile Cap 168, 170, 172, 174 (foundation)
Single Layer of 4mm Thick Modified Bituminous WP Membrane in Colonnades Foundation at Zone 2P (as
Solvent Base Primer coating in Colonnades Foundation at Zone 2P (as Highlighted)
Surface Preparation Prior to Start Water Proofing in Colonnades Foundation at Zone 2P (as Highlighted)
Shuttering and Concreting of Plain Concrete Under 5 internal Foundation Plain Concrete at Zone 2C (as
Application of Anti Termite Under 5 internal Foundation Plain Concrete at Zone 2C (as Highlighted)
Protection Layer of 4mm Thick Bituminous Protection Board of Strip Footing for TIP (Zone 2A)
Single Layer of 4mm thick Modified Bituminous WP Membrane of Strip Footing for TIP (Zone 2A)
Concreting of Strip Footing in Zone 2N Between axis 02-2, 02-AT to 02-AR (as Highlighted)
Shuttering of Strip Footing in Zone 2N Between axis 02-2, 02-AT to 02-AR (as Highlighted)
Steel Reinforcement of Strip Footing in Zone 2N Between axis 02-2, 02-AT to 02-AR (as Highlighted)
3rd layers of Stack Boulders wall Installed at Planted bed of Boat Garden, at highlighted area in att
Treatment of Hair Cracks using Epoxy Fillir (Sikadur 31/41 CF, A & B) for Footing & Kicker of bound
Openning of Hair Cracks prior to Repair for Footing & Kicker of boundary wall Span 37, 38 & 39 of
Concrete pouring & Shuttering of Kicker (Outside) for boundary wall Span 37 of Water Garden, as per
Coordinates & levels of Kicker (Outside) for boundary wall Span 37 of Water Garden, as per highligh
Concrete pouring & Shuttering of Kicker (Outside) for boundary wall Span 34, 35 & 36 of Water Garde
Coordinates & levels of Kicker (Outside) for boundary wall Span 34, 35 & 36 of Water Garden, as per
Concrete pouring & Shuttering of Kicker (Outside) for boundary wall Span 30 & 33 of Water Garden,
Coordinates & levels of Kicker (Outside) for boundary wall Span 30 & 33 of Water Garden, as per hig
Installation of fire protection pipes and fittings ERW pipes (sch. 40) ; as per high lighted in dwg.
Installation of HVAC DUCT WORKS; as per high lighted in dwg.
Installation of Box and UPVC straight conduit (Dia.25mm) for Power (Trunk Mounted 13A Twin Switc
Solvent Base Primer application for tunnel 2 above Blinding for Slab and Wall (as highlighted).
Steel Reinforcement for Buttress BIV-BII 114 (1st).
Concrete Pouring & Shuttering for Pedestal (Column's 03 no's @ Grids A / 3, 4 & 5) for foundation of
Surface Preparation prior to Water proofing for Boundary Wall Foundation (Inner Face) @ Span 24, 25,
Concrete Pouring & Shuttering for Wall @ Grid 7 to 12 or (6-11/Right Side), of Boundary wall at Aviar
Coordinates, levels & Alignment of Wall @ Grid 7 to 12 or (6-11/Right Side), of Boundary wall at Avia
Steel Reinforcement for wall of Span 39 for boundary wall of Water Garden, as per highlighted Attac
Concrete pouring for Blinding of Boundary wall (C, D, E, F & I) at Sound & Light Garden, At highlighte
Coordinates & Top level of Blinding for Boundary wall (C, D, E, F & I) at Sound & Light Garden, At hig
Excavation & Surface Preparation for foundation of boundary wall (C, D, E, F & I) at Sound & Light Ga
Installation of Rock and Boulder No. RB-274 (1st Layer)
Installation of Rock and Boulder No. RB-326a (1st Layer)
Installation of Rock and Boulder No. RB-286 (3rd Layer)
Inspection of Formwork for the Wall of Seating Area (1) at Zone-K (SA-17) As Highlighted
Completion of Rock Boulder No.RB- 279 with Grouting
Soil Preparation under Boulder No.RB- 326a
Inspection of Formwork for the Beam of Seating Area (1) at Zone-G (SA-11) As Highlighted
Inspection of Steel Reinforcement for the Beam of Seating Area (1) at Zone-G (SA-11) As Highlighted
Inspection of Steel Reinforcement for the Foundation and Wall of Seating Area (1) at Zone-K (SA-14) As
Installation of Rock and Boulder No. RB-067 (4th Layer)
Inspection for application of Protection Layer 4mm Thick Bituminous Protection Board on top of Bitum
Inspection for application of Protection Layer 4mm Thick Bituminous Protection Board on top of Bitumi
Inspection for application of Bituminous Damp Proofing (2nd Coat) on top of Primer for Foundation and
Protection Layer of 4mm THK Bituminous Protection Board of Slab at Tunnel 1 Zone 5 (as Highlighted)
Protection Layer of 4mm THK Bituminous Protection Board Under Pile Cap (PC 90, 89) as Hihglighted
Steel Reinforcement for Buttress BIV-BII 113 (1st)
Steel Reinforcement for Buttress BIV-BII 115 (1st)
Solvent Base Primer Coating of Strip Footing for TIP (Zone 2A)
Protection Layer of Geo-textile sheet and Screed Protection Under Pile Cap (PC 90, 89) as Hihglighted
Single Layer of 4mm thk Modified Bituminous WP Membrane Under Pile Cap (PC 90, 89) as Hihglighted
Stone Cladding for Boundary wall (Inner Face) @ Grid (EXC1-12 to EXC3-11) at Physic Garden at highl
Soil Preparation prior to Start Backfilling for Base of Boundary Wall Span 26, 27, 28 & 29 at Water G
Surface Preparation prior to Stone Cladding for boundary wall (Outer face) @ span 8, 9, 10 & 11 @ W
Aluminium Flashing & Sealant for Water Proofing of boundary wall Foundation (Outer face) @ span 1
Slated layer 4mm thk Modified Bituminous Water Proofing Membrane for boundary wall Foundation (
Geo Textile on Blinding under boundary wall (A, B, G & H) at Sound & Light Garden, At highlighted ar
Protection layer 4mm thk Bituminous protection board (Both sides 500mm wide) on Blinding under bou
Single layer 4mm thk Modified Bituminous Water Proofing Membrane (Both sides 500mm wide) on Blind
Protection layer 4mm thk Bituminous protection board for boundary wall Foundation (Inner Face) @
300 mm Gravel Back Filling Above Foul Water Line (400mmØ - UPVC - Class 4) from (FW1 to FW1-
Surface Preparation Prior to Start WP of Foundation for internal building at zone 2R (as Highlighted)
Coordinates & levels of Kicker (Inside) for boundary wall Span 34 & 35 of Water Garden, as per highl
Concrete pouring & Shuttering of Kicker (Inside) for boundary wall Span 34 & 35 of Water Garden, as
Completion of Rock Boulder No.RB- 303 with Grouting
Steel Reinforcement of Kicker for boundary wall Span 34 & 35 of Water Garden, as per highlighted A
Installation of Rock and Boulder No. RB-286 (2nd Layer)
Solvent Base Primer Coating (Both sides 500mm wide) for Blinding prior to Water proofing under boun
2nd Coat Cementitious Water Proofing for Blinding under boundary wall (A, B, G & H) at Sound & Ligh
Inspection of concrete pouring for the Foundation of Seating Area (1) at Zone-K (SA-17) As Highlighted
"Inspection of Concrete Pouring for Foundation and Kicker of SBC-09 As Highlighted"
Inspection for application of Protection Layer 4mm Thick Bituminous Protection Board on top of Bitum
Inspection for application of Protection Layer 4mm Thick Bituminous Protection Board on top of Bitum
Inspection for application of Protection Layer 4mm Thick Bituminous Protection Board on top of Bitum
Cast of concrete encastment ( L=17M) for Foul water line between (FW1-2.2 to FW1-2.3); as per att
Inspection for application of Protection Layer 4mm Thick Bituminous Protection Board on top of Bitum
1st Coat Cementitious Water Proofing for Blinding under boundary wall (A, B, G & H) at Sound & Light
2nd layers of Stack Boulders wall Installed at Planted bed of Boat Garden, at highlighted area in att
Protection layer 4mm thk Bituminous protection board for boundary wall Foundation (Inner Face) @ Sp
2nd Coat Damp proofing for Boundary wall Foundation (Inner Face) @ Span 38 & 39, As per Highligh
1st Coat Damp proofing for Boundary wall Foundation (Inner Face) @ Span 38 & 39, As per Highlight
Inspection for Casting the Blinding Concrete under the Manhole of Foul Water(FW 9-1,FW 13 &FW 14) a
Solvent Base Primer Coating for Pile Cap (PC 167, 169, 171, 173) as highlighted
Surface Preparation Prior to start Water Proofing for Pile Cap (PC 167, 169, 171, 173) as highlighted
Two Layer of 4mm THK Modified Bituminous WP membrne for Tunnel 2 Above Blinding for Slab and Wall
Two Layer of 4mm Thick Modified Bituminous WP Membrane of Slab at Tunnel 1 Zone 5 (as Highlighte
Solvent Base Primer of Slab at Tunnel 1 Zone 5 (as Highlighted) (Near MCPE)
Two Coats of Bituminous Damp Proofing-Coating of Foundation for internal building at zone 2R (as High
Base Primer Coating (50% x 50% Bitumin and Water) of Foundation for internal building at zone 2R (as H
Base Primer Coating (50% x 50% Bitumin and Water) of Foundation for internal building at zone 2Q (as H
Excavation of Storm Water Line (Outfall - B Tranch) (450 mmØ - UPVC - Class 4) from (G-B-10 to Culver
Installation of stub-up UPVC conduit (Dia.32mm 2Pcs. Each Socket Outlet) for Power at the Crescent -0
Installation of stub-up UPVC conduit (Dia.32mm 2Pcs. Each F1/CE & F2 ) for Lighting (Flood Light) at t
Installation of earthing clamps with conductor 70mm (2pcs.) for earthing reinforcement steel re-bar a
Installation of stub-up UPVC conduit (Dia. 25mm: 2Pcs each WIFI & CAM ) for Voice and Data at the Cre
Installation of stub-up UPVC conduit (Dia. 25mm: 2Pcs each CAM ) for Security at the Crescent-02 (Ax
Installation of stub-up UPVC conduit (Dia. 25mm: 2Pcs each Speaker) for Fire Alarm at the Crescent-02
Steel Reinforcement for Wall @ Grid 7 to 12 or (6-11/Right Side), of Boundary wall at Aviary Garden,
Level, Location of Pile Cap (foundation) 172 & 174 (as Highlighted)
Level, Location of 10 Plain Concrete in North Admin Building (as Highlighted) Zone 2Q
Level, Location of Plain Concrete for Strip Footing Between PC 193-191-189-187 (as Highlighted) (Axis
Solvent Base Primer Coating Under Pile Cap (PC 90, 89) as Hihglighted
Surface Preparation Prior to Start Water Proofing Under Pile Cap (PC 90, 89) as Hihglighted
Shuttering and Concreting of Pile Cap (Foundation) 172 & 174 (as Highlighted)
Steel Reinforcement of Pile Cap (Foundation) 172 & 174 (as Highlighted)
Protection Layer of Geo-Textile and Screed Under Strip Footing for TIP (Zone 1P)
Single Layer of 4mm THK Modified Bituminous WP Under Strip Footing for TIP (Zone 1P)
Solvent Base Primer Coating Under Strip Footing for TIP (Zone 1P)
Shuttering and Concreting on 10 internal Foundation Plain Concrete at Zone 2Q (as Highlighted)
Application of Anti Termite Under 10 internal Foundation Plain Concrete at Zone 2Q (as Highlighted)
Protection Layer of 4mm THK Bituminous Protection Board for Pile Cap at Zone 2Q (PC 187 to 194)
Completion of Rock Boulder No.RB- 241 with Grouting
Installation of Rock and Boulder No. RB-66 ( 3rd Layer)
Soil Preparation under Boulder No.RB- 115
Soil Preparation under Boulder No.RB- 115a
Inspection for application of Bituminous Damp Proofing (2nd Coat) for Cast concrete (L=17m) of Foul
Inspection for application of Bituminous Damp Proofing (1st Coat) for Cast concrete (L=17m) of Foul
Inspection for application of Primer (1 Coat) Waterproofing for Cast concrete (L=17m) of Foul water
Inspection for application of Protection Layer 4mm Thick Bituminous Protection Board on top of Bitum
Excavation of Storm Water Line from (Concrete Encasment Point to MH-A-13) Prior Gravel Bedding
Excavation & Blinding Concrete for Foul Water Manholes (FW6-2 & FW6-3).
Pipe Installation of FOUL WATER Line (400 mmØ - UPVC - Class 4) at (FW1 to FW1-1).
Surface preparation prior to Waterproofing on Blinding of Boundary wall (A, B, G & H) at Sound & Lig
Concrete pouring & Shuttering for Kicker (Inside) for boundary wall Span 36 of Water Garden, as per
Coordinates & levels of Kicker (Inside) for boundary wall Span 36 of Water Garden, as per highlighte
Concrete pouring & Shuttering for Kicker (Inside) for boundary wall Span 30 & 33 of Water Garden, a
Coordinates & levels of Kicker (Inside) for boundary wall Span 30 & 33 of Water Garden, as per highl
Concrete Pouring & Shuttering for Stiffner columns & Lintel of window at Grid (6/I-M) in Management
Steel Reinforcement for Stiffner columns & Lintel of window at Grid (6/I-M) in Management Building,
Inspection of Block work upto Lintel level at Grid 6/I-M, 10/H-N, 13/H-N, as highlighted in attached D
Inspection of Block work upto Sill level at Grid 6/I-M, 10/H-N, 13/H-N, as highlighted in attached Dra
Inspection for application of Primer (1 Coat) on External Wall and Top Slab of SBC-04 (As Highlighted)
Inspection for application of Bituminous Damp Proofing (2nd Coat) on top of Primer for Foundation and
Inspection for application of Bituminous Damp Proofing (2nd Coat) on top of Primer for Foundation and
Inspection for application of Bituminous Damp Proofing (2nd Coat) on top of Primer for Foundation and
Inspection for application of Bituminous Damp Proofing (2nd Coat) on top of Primer for Foundation and
Inspection for application of Bituminous Damp Proofing (2nd Coat) on top of Primer for Foundation and
Excavation of Storm Water Line From (Outfall-X to MH-X-01) Prior Gravel Bedding Includes Manhole
300 mm Gravel Back Filling Above Foul Water Line (110 mmØ - UPVC - Class 4 (FW1-2 to Ware House
Installation of Rock and Boulder No. RB-067 (3rd Layer)
Installation of Rock and Boulder No. RB-65 (4th Layer)
Inspection of concrete pouring for the Foundation of Seating Area (1) at Zone-K (SA-14) As Highlighted
Level and Location of Blinding for MCPE Foundation at Zone 2H (as Highlighted)
Shuttering and Concreting of Mass Concrete Under Strip Footing at Zone 2Q (Between Axis PC 193-191
Application of Anti Termite Under Strip Footing Mass Concrete at Zone 2Q (Between Axis PC 193-191-1
Shuttering and Concreting of Blinding for MCPE Foundation at Zone 2H (as Highlighted)
Application of Anti Termite Under Blinding for MCPE Foundation at Zone 2H (as Highlighted)
Protection Layer of Geo-textile Sheet and Screed for Under Strip Footing Between PC 181-179-177 (Zon
Single Layer of 4mm THK Modified Bituminous WP for Under Strip Footing Between PC 181-179-177 (Zo
Solvent Base Primer Coating for under Strip Footing Between PC 181-179-177 (Zone 2N)
Surface Preparation Prior to start Water Proofing for under Strip Footing Between PC 181-179-177 (Zon
Solvent base primer coating for Pile Cap at Zone 2N (PC 175 to 182)
Surface Preparation Prior to Start Water Proofing of Strip Footing for TIP (Zone 2A)
Surface Preparation Prior to Start Water Proofing Under Strip Footing for TIP (Zone 1P)
Single Layer of 4mm thk modified bituminous WP for Pile Cap at Zone 2Q (PC 187 to 194)
Solvent Base Primer Coating for Pile Cap at Zone 2Q (PC 187 to 194)
Concreting of 3 Column/Buttress for Colonnades (zone 2P) as highlighted axis 02 AT & 02 AW
Shuttering and Concreting of Column/Buttress for PC 183 Axis 02-AU / 02-2 (2nd)
Joint Surface Preperation prior to start grout for Boulder No.RB- 071
"Inspection of Formwork for the Foundation of Seating Area (1) at Zonek (SA-14) As Highlighted"
Soil Preparation under Boulder No.RB- 295
Inspection to check Level, Location and Coordinates for MCPE-3 foundation RC.
Inspection to check Level, Location & Coordinates for Butress 183 2nd stage.
Surface preparation before Waterproofing for Colonnades Foundation as highlighted.
Inspection to check Reinforcement for MCPE-3 foundation.
Inspection to check Shuttering & Concreting of R.C. for MCPE-3 foundation.
Concrete pouring & Shuttering for Kicker (Inside) for boundary wall Span 37 & 39 of Water Garden, a
Coordinates & levels of Kicker (Inside) for boundary wall Span 37 & 39 of Water Garden, as per highl
Concrete pouring & Shuttering for Kicker (Outside) for boundary wall Span 38 of Water Garden, as pe
Coordinates & levels of Kicker (Outside) for boundary wall Span 38 of Water Garden, as per highligh
Concrete pouring for Blinding of Boundary wall (A, B, G & H) at Sound & Light Garden, At highlighted
Inspection of First layer Block layout at Grid 6/I-M, 10/H-N, 13/H-N, as highlighted in attached Drawin
Concrete pouring & Shuttering for Footing of boundary wall Span 34 & 35 of Water Garden, as per hi
Steel Reinforcement for Footing of boundary wall Span 34 & 35 of Water Garden, as per highlighted
Coordinates & levels of Footing of boundary wall Span 34 & 35 of Water Garden, as per highlighted
Surface preparation Prior to Stone Cladding for Boundary wall (Outer & Inner Face) @ Grid (EXC1-04/
Stone Cladding for Boundary wall (Inner Face) @ Grid (EXC1-13 to EXC4-51 to EXC4-43) at Physic Gard
Stone Cladding for Columns of Boundary wall @ Column No. C24, C24A, C25 & C26 (All Sides), As per
Stone Cladding for Columns of Boundary wall @ Column No. C20, C22 & C23 (All Sides), As per Attach
Stone Cladding for Columns of Boundary wall @ Column No. C68A & C68B (All Sides), As per Attached
Stone Cladding for Columns of Boundary wall @ Column No. C67C & C67D (All Sides), As per Attached
Protection layer 4mm thk Bituminous protection board for boundary wall Foundation (Outer face) @
Single layer 4mm thk Modified Bituminous Water Proofing Membrane for boundary wall Foundation (
Solvent Base Primer Coating of Water Proofing for boundary wall Foundation (Inner face) @ span 8,
Completion of Rock boulders with Grouting for Planted bed # 1, 2 & 3, of Water Play Garden, at highl
Installation of Rock and Boulder No. RB-112 ( 4th last Layer)
form work for the Foundation of SBC-09
Installation of Rock and Boulder No. RB-68 (1st Layer)
Excavation & Surface Preparation for foundation of boundary wall (A, B, G & H) at Sound & Light Gard
Soil Preparation for foundation of Boundary wall (C, D, E, F & I) & All Light walls at Sound & Light Ga
Coordinates & Top of Blinding for Boundary wall (A, B, G & H) at Sound & Light Garden, At highlighte
Concrete pouring & Shuttering for Footing of boundary wall Span 36 of Water Garden, as per highlig
Coordinates & levels of Footing of boundary wall Span 36 of Water Garden, as per highlighted Attac
Steel Reinforcement for Footing & kicker of boundary wall Span 36 of Water Garden, as per highligh
Aluminium Flashing & Sealant for Water Proofing of boundary wall Foundation (Outer face) @ span 8
Slated layer 4mm thk Modified Bituminous Water Proofing Membrane for boundary wall Foundation (
Concrete pouring & Shuttering Footing of boundary wall Span 30 & 33 of Water Garden, as per highl
Coordinates & levels of Footing of boundary wall Span 30 & 33 of Water Garden, as per highlighted
Steel Reinforcement for Footing & kicker of boundary wall Span 30 & 33 of Water Garden, as per hig
Steel Reinforcement for Footing & kicker of boundary wall Span 37 of Water Garden, as per highligh
Level, Location of Pile Cap (foundation) 168 & 170 (as Highlighted)
Steel Reinforcement of Pile Cap (Foundation) 168 & 170 (as Highlighted)
Concreting of Pile Cap (Foundation) 168 & 170 (as Highlighted)
Shuttering of Pile Cap (Foundation) 168 & 170 (as Highlighted)
Protection Layer of 4mm THK Bituminous Protection Bd. for Below Foundation PC 157 to 164 (zone 2L) a
Protection Layer of Geotextile Sheet and 30mm Screed for Below Foundation PC 157 to 164 (zone 2L) as
Steel Reinforcement of Column/Buttress for PC 183 Axis 02-AU / 02-2 (2nd)
Concreting for Retaining Wall (Wall) (as Highlighted at AXIS AD TO AB)
Backfilling of gravel 38/" (300mm Thick) for Foul Water Line (160mmØ) in (FW12 to FW14). At highlig
WARNING TAPE Installation for Foul Water Line of 160mmØ upvc pipes class 4 (FW6 to FW6-1)as per
WARNING TAPE Installation for Foul Water Line of 250mmØ upvc pipes class 4 (FW5 to FW6)as per hi
WARNING TAPE Installation for Foul Water Line of 250mmØ upvc pipes class 4 (FW6 to FW8)as per hi
Level and Location of Blinding for MCPE Foundation at Zone 2G (as Highlighted)
Application of Anti Termite Under Blinding for MCPE Foundation at Zone 2G (as Highlighted)
Shuttering and Concreting of Blinding for MCPE Foundation at Zone 2G (as Highlighted)
Inspection for Casting the Blinding Concrete under the Manhole of Foul Water (FW1 ,& FW 1-1 FW 1-2,
Completion of Rock Boulder No.RB- 294 with Grouting
Installation of Rock and Boulder No. RB-286 (1st Layer)
Installation of Rock and Boulder No. RB-65 (3rd Layer)
Inspection for application of Bituminous Damp Proofing (2nd Coat) on top of Primer for Foundation and
Inspection for application of Base Primer (50%x50% Bitumin & Water) on Foundation and wall at Play Ar
Inspection for application of Protection Layer 4mm Thick Bituminous Protection Board on top of Bitum
Inspection for application of Protection Layer 4mm Thick Bituminous Protection Board on top of Bitum
Inspection for application of Protection Layer 4mm Thick Bituminous Protection Board on top of Bitum
Inspection for application of Protection Layer 4mm Thick Bituminous Protection Board on top of Bitum
Concrete pouring for Blinding of boundary wall @ span 30, 32 & 33 at Water Garden at highlighted ar
Solvent Base Primer Coating of Water Proofing for boundary wall Foundation (Outer face) @ span 10
Inspection of Plaster Guide Point and plaster accessories prior to start Spatter Dash(Rough Coat) for
Concrete pouring & Shuttering Footing of boundary wall Span 37 of Water Garden, as per highlighte
Coordinates & levels of Footing of boundary wall Span 37 of Water Garden, as per highlighted Attac
Concrete pouring & Shuttering for Kicker (Outside) for boundary wall Span 39 of Water Garden, as pe
Coordinates & levels of Kicker (Outside) for boundary wall Span 39 of Water Garden, as per highligh
Concrete pouring & Shuttering for Kicker (Inside) for boundary wall Span 38 of Water Garden, as per
Coordinates & levels of Kicker (Inside) for boundary wall Span 38 of Water Garden, as per highlighte
Concreting for Retaining Wall (Foundation) (as Highlighted at AXIS AB TO Z)
Concreting for Tunnel 1 Service Access (near Axis 02-01) as Highlighted
Concreting of Column/Buttress for PC 185 Axis 02 AV / 02 2 (2nd)
Concreting of Mass Concrete for TIP Foundation at Zone 1P (as highlighted)
Application of Anti termite Below Mass Concrete for TIP Foundation at Zone 1P (as highlighted)
Shuttering of Mass Concrete for TIP Foundation at Zone 1P (as highlighted)
Level & Location of Mass Concrete Below Strip Footing at TIP zone 1P
Level and Location for Retaining Wall - top and bottom of wall (between axis AD to AB) zone 1 (inner)
Shuttering for Retaining Wall (Wall) (as Highlighted at AXIS AD TO AB)
Level, Location of Pile Cap (foundation) 167, 169, 171, 173 (as Highlighted)
Concreting of Pile Cap (Foundation) 167, 169, 171, 173 (as Highlighted)
Shuttering of Pile Cap (Foundation) 167, 169, 171, 173 (as Highlighted)
Steel Reinforcement of Pile Cap (Foundation) 167, 169, 171, 173 (as Highlighted)
Excavation, soil preparation of the bottom of manhole prior to concrete blinding (FW5 TO FW8) as per
Installation of FOUL WATER LINE upvc pipes (160mm Ø)class 4 (FW12 to FW14) ; as per high lighted i
'Backfilling of gravel 38/" (300mm Thick) for Foul Water Line (160mmØ) in (FW6-1 to FW6-3). At highl
Installation of sub surface main line drainage and branches perforated upvc pipes class 4 (110, 160
Completion of Rock Boulder No.RB- 323 with Grouting
Joint Surface Preperation prior to start grout for Boulder No.RB- 267
Completion of Rock Boulder No.RB- 246 with Grouting
Installation of Rock and Boulder No. RB-65a (3rd Layer)
Installation of Rock and Boulder No. RB-112 (3rd Layer)
Installation of Rock and Boulder No. RB-67 ( addition for 2nd Layer)
Concreting of Strip Footing Mass Concrete at Zone 2N (Between Axis 02-AT to 02 AS, 02-AS to 02-AR) as
Level and Location coordinates of Strip Footing Mass Concrete at Zone 2N (Between Axis 02-AT to 02 AS
Surface Preparation prior to Start Water Proofing of Foundation for internal building at zone 2Q (as Hig
Completion of Rock Boulder No.RB- 325 with Grouting
Completion of Rock Boulder No.RB- 288 with Grouting
Completion of Rock Boulder No.RB- 278 with Grouting
Surface Preparation Prior to Start Water Proofing for Tunnel 2 Above Blinding for Slab and Wall (as High
Completion of Rock Boulder No.RB- 312 with Grouting
Surface Preparation Prior to Start Water Proofing for Pile Cap at Zone 2N (PC 175 to 182)
Two Coat of Bituminous Damp Proofing- Coating of foundation at South Administration Building (as Hig
Completion of Rock Boulder No.RB- 151 with Grouting
Surface preparation prior to Water Proofing for boundary wall Foundation (Outer face) @ span 10 &
Surface Preparation Prior to Start Water Proofing for Pile Cap at Zone 2Q (PC 187 to 194)
Surface preparation prior to Water Proofing for boundary wall Foundation (Inner face) @ span 8, 9,
Completion of Rock Boulder No.RB- 150 with Grouting
Protection layer 4mm thk Bituminous protection board for boundary wall Foundation (Outer face) @
Single layer 4mm thk Modified Bituminous Water Proofing Membrane for boundary wall Foundation (O
Coordinates & Top Level of Pedestal (Column's 03 no's @ Grids A / 3, 4 & 5) & Anchor bolts for fou
Completion of Rock Boulder No.RB- 301 with Grouting
Gravel 3/8 Bedding & Geotextile Surround for Sub Surface Drain Pipe (250mm & 200mm dia Pipes @ No
Gravel 3/8 Bedding & Geotextile Surround for Sub Surface Drain Pipe (110mm & 160mm Part 2) at Phy
Inspection for application of Bituminous Damp Proofing (2nd Coat) on top of Primer for Foundation and
Application of Anti Termite Under Strip Footing Mass Concrete at Zone 2N (Between Axis 02-AT to 02 AS
Shuttering of Strip Footing Mass Concrete at Zone 2N (Between Axis 02-AT to 02 AS, 02-AS to 02-AR) as
Installation of Box and UPVC straight conduit (Dia.25mm) for Power (Trunk Mounted 13A Twin Swit
Installation of sub surface main line drainage upvc pipes class 4 (110, 160, &250mmØ) as per high lig
Concrete pouring & Shuttering of Footing for boundary wall Span 38 & 39 of Water Garden, as per hi
Steel Reinforcement for Pedestal Column's (03 no's @ Grids A / 3, 4 & 5) of Ticket Booths Canopy.
Concrete pouring & Shuttering for Wall @ Grid 1 to 7 or (1-7/Right Side), of Boundary wall at Aviary
Stone Cladding for Columns of Boundary wall @ Column No. C31, C32, C33 & C34 (All Sides), As per A
Stone Cladding for Columns of Boundary wall @ Column No. C45, C46 & C47 (All Sides), As per Attach
Stone Cladding for Columns of Boundary wall @ Column No. C42, C43 & C44 (All Sides), As per Attach
Level, Location of 12 foundation in North Administation Building (as Highlighted) Zone 2R
Surface Preparation Prior to Start Water Proofing of Slab at Tunnel 1 Zone 5 (as Highlighted) (Near MCP
Concreting for 12 foundation at North Administration Building (as Highlighted) Zone 2R
Shuttering for 12 foundation at North Administration Building (as Highlighted) Zone 2R
Steel Reinforcement for 12 foundation at North Administration Building (as Highlighted) Zone 2R
'Installation for Foul Water Line of upvc pipes calss 4 (160mmØ) at (FW6-1 to FW6-3). highlighted ar
'Installation for Foul Water Line of upvc pipes calss 4 (110mmØ) at (FW1-2 to Warehouse). highlight
'Backfilling of gravel 38/" (300mm Thick) for Foul Water Line (160mmØ) in (FW1-2 to FW1-2.3). At hig
'BEDDING Gravel 3/8" and Geotextile for Foul Water Line for upvc pipes calss 4 (400mmØ) in (FW1 to
BEDDING Gravel 3/8" and Geotextile for Foul Water Line for upvc pipes calss 4 (160mmØ) in (FW11 to
Installation of Rock and Boulder No. RB-67 ( addition for 1st Layer)
Installation of Rock and Boulder No. RB-66 ( 2nd Layer)
Inspection for application of Protection Layer 4mm Thick Bituminous Protection Board on top of Bitum
Inspection for application of Bituminous Damp Proofing (2nd Coat) on top of Primer for Foundation and
Inspection for application of Bituminous Damp Proofing (2nd Coat) on top of Primer for Foundation and
Inspection for application of Bituminous Damp Proofing (2nd Coat) on top of Primer for Foundation and
Inspection for application of Bituminous Damp Proofing (2nd Coat) on top of Primer for Foundation and
Inspection of concrete pouring for the Foundation of Seating Area (1) at Zone-K (SA-17) As Highlighted
Completion of Rock Boulder No.RB- 245 with Grouting
Completion of Rock Boulder No.RB- 243 with Grouting
Completion of Rock Boulder No.RB- 300 with Grouting
Installation of Rock and Boulder No. RB-112 (2nd Layer)
Installation of Rock and Boulder No. RB-262 (4th Layer)
Surface preparation prior to Damp Proofing for Pedestal (Column's Surround) 05 no's @ Grids (A/1 &
Geo Textile for Blinding under boundary wall @ span 30, 32 & 33 @ Water Garden at highlighted area
Protection Layer 4mm thk. Bituminous Protection Board for Blinding under boundary wall @ span 30,
Single Layer Water proofing membrane 4mm thk. (Both sides 500mm wide) for Blinding under bounda
Geo Textile for Blinding under boundary wall @ span 34, 35 & 36 @ Water Garden at highlighted area
Protection Layer 4mm thk. Bituminous Protection Board for Blinding under boundary wall @ span 34,
Single Layer Water proofing membrane 4mm thk. (Both sides 500mm wide) for Blinding under boundar
Coordinates & levels of Footing for boundary wall Span 38 & 39 of Water Garden, as per highlighted
Steel Reinforcement for Footing & kicker of boundary wall Span 38 & 39 of Water Garden, as per hig
Soil Preparation prior to Backfilling along the Boundary Wall (Inner Side) of Span 22, 23, 24 & 25 at
Surface preparation prior to Stone Cladding for boundary wall (Outer face) @ span 7, 8 & 9 @ Water
Aluminium Flashing & Sealant for Water Proofing of boundary wall Foundation (Outer faces) @ span
Slated layer 4mm thk Modified Bituminous Water Proofing Membrane for boundary wall Foundation (
Protection layer 4mm thk Bituminous protection board for boundary wall Foundation (Outer faces) @
Single layer 4mm thk Modified Bituminous Water Proofing Membrane for boundary wall Foundation (O
Solvent Base Primer Coating of Water Proofing for boundary wall Foundation (Outer face) @ span 8 &
Surface preparation prior to Water Proofing for boundary wall Foundation (Outer face) @ span 8 & 9
2nd Coat Cementitious Water Proofing for Blinding under boundary wall @ span 30, 32 & 33 @ Water
Protection Layer of 4mm THK Bituminous Protection Board of foundation at South Administration Buildi
Steel Reinforcement for Retaining Wall (wall) (as Highlighted at AXIS AD TO AB)
Shuttering for Retaining Wall (Foundation) (as Highlighted at AXIS AB TO Z)
Steel Reinforcement for Retaining Wall (Foundation) (as Highlighted at AXIS AB TO Z)
Coordinate and top level of foundation cencrete in retaining wall Between Axis AB to Z as highlighted
Level, Location of Tunnel 1 Service access (as Highlighted) Near Axis 02-1
Shutteringt for Tunnel 1 Service Access (near Axis 02-01) as Highlighted
Surface preparation prior to Water Proofing for boundary wall Foundation (Outer face) @ span 5 & 6
Surface preparation prior to Water Proofing for boundary wall Foundation (Inner face) @ span 5 & 6
Gravel 3/8" and Geotextile for Foul Water Line sorrounding of upvc pipes calss 4 (160mmØ) in (FW6-1
Gravel 3/8" and Geotextile for Foul Water Line sorrounding of upvc pipes calss 4 (110mmØ) in (FW1-2
Installation of FOUL WATER LINE upvc pipes class 4 (160mmØ) (FW1-2 to FW1-2.3) as per high lighte
Installation of stub-up PVC conduit for Lighting (Power-Dia.50mm 2pcs& Grounding - Dia.32mm 1pc. Ea
Concrete Pouring & Shuttering for Lintels of Doors & Walls at Grid (4/T-X) and Window Sills at Grid
Steel Reinforcement for Lintels of Doors & Walls at Grid (4/T-X) and Window Sills at Grid (10 & 13/H
Soil Preparation prior to Backfilling along the Boundary Wall (Outer Face) @ Grid (EXC4-11/12 to 27/
1st Coat Cementitious Water Proofing for Blinding under boundary wall @ span 30, 32 & 33 @ Water
Solvent Base Primer Coating (Both sides 500mm wide) for Blinding prior to Water proofing under bo
Surface preparation of Blinding prior to Water proofing under boundary wall @ span 30, 32 & 33 @ W
Inspection for application of Bituminous Damp Proofing (1st Coat) on top of Primer for Foundation and w
2nd Coat Cementitious Water Proofing for Blinding under boundary wall @ span 34, 35 & 36 @ Water
1st Coat Cementitious Water Proofing for Blinding under boundary wall @ span 34, 35 & 36 @ Water
Inspection for application of Bituminous Damp Proofing (1st Coat) on top of Primer for Foundation and
Inspection for application of Bituminous Damp Proofing (1st Coat) on top of Primer for Foundation and
Solvent Base Primer Coating (Both sides 500mm wide) for Blinding prior to Water proofing under bo
Inspection for application of Bituminous Damp Proofing (1st Coat) on top of Primer for Foundation and
Inspection for application of Bituminous Damp Proofing (1st Coat) on top of Primer for Foundation and
Inspection for application of Bituminous Damp Proofing (1st Coat) on top of Primer for Foundation and
Inspection for application of Damp Proofing (1st Coat) on top of Primer for External Wall and Top Slab o
Inspection for application of Primer (1 Coat) on External Wall and Top Slab of SBC-04) - As Highlighted
Surface preparation of Blinding prior to Water proofing under boundary wall @ span 34, 35 & 36 @ W
Coordinates, levels & Alignment of Wall @ Grid 1 to 7 or (1-7/Right Side), of Boundary wall at Aviary
Installation of Box and UPVC straight conduit (Dia.25mm) for Power (13A Twin Switched Socket Outlet
Excavation & Bed Preparation for Sub-Surface Drain Pipes (250mm & 200mm dia Pipes @ North-west Si
Excavation & Bed preparation for Sub Surface Drain Pipe (110mm & 160mm Part 2) at Physic Garden a
Cast of blinding concrete for Foul water line manhole (FW9, FW10, FW11, FW12, FW12-1, & FW12-2)
Protection Layer of 4mm THK Bituminous Protection Board below foundation of Retaining wall Between
Application of 2nd Layer 4mm thk. APP Modified Bituminous WP membrane below foundation of Retaini
Excavation for foul water line from (FW12 to FW14) prior to gravel bedding. At highlighted area in
Level and Coordinates of Excavation for Strip Footing in Zone 2M and 2N
Base Primer Coating (50% x 50% Bitumin and Water) of foundation at South Administration Building (as
Level & Coordinates of Excavation of Strip Footing at TIP zone 1P
Level, Coordinates of Butress Column for PC 185 As Highlighted (2nd)
Shuttering of Column/Buttress for PC 185 Axis 02 AV / 02 2 (2nd)
Shuttering for Retaining wall (wall) At Axis AD to AF (as Highlighted)
WARNING TAPE Installation of Foul Water Line of 110 & 160mmØ upvc pipes class 4 (FW1-3 to FW1-4
WARNING TAPE Installation of Foul Water Line of 110 & 160mmØ upvc pipes class 4 (FW9 to FW9-1 &
'Backfilling of gravel 38/" (300mm Thick) for Foul Water Line (110 &160mmØ) in (FW1-3 to FW1-4 & Bu
Backfilling of gravel 38/" (300mm Thick) for Foul Water Line (160mmØ) in (FW9 to Management BLDG.)
'BEDDING of gravel 38/" and Geotextile for Foul Water Line (160mmØ) in (FW1-2 to FW1-2.2). At high
Gravel 3/8 Bedding & Geotextile Surround for Sub Surface Main Line (250mm Part 2) at Physic Garden
Solvent Base Primer Coating of Water Proofing for boundary wall Foundation (Outer faces) @ span 7
Surface preparation prior to Water Proofing for boundary wall Foundation (Inner & Outer faces) @ s
Stone Cladding for Columns of Boundary wall @ Column No. C27 & C27A (All Sides), As per Attached
Stone Cladding for Columns of Boundary wall @ Column No. C28, C29 & C30 (All Sides), As per Attach
Stone Cladding for Columns of Boundary wall @ Column No. C49A, C49B & C50A (All Sides), As per At
Stone Cladding for Columns of Boundary wall @ Column No. C63 & C64 (All Sides), As per Attached Hi
Stone Cladding for Columns of Boundary wall @ Column No. C67A, C67B & C67C (All Sides), As per At
Geo Textile for Blinding under boundary wall @ span 37, 38 & 39 @ Water Garden at highlighted area
Protection Layer 4mm thk. Bituminous Protection Board for Blinding under boundary wall @ span 37,
Single Layer Water proofing membrane 4mm thk. (Both sides 500mm wide) for Blinding under boundar
Excavation & Bed preparation for Sub Surface Main Line Drain Pipe (250mm Part 2) at Physic Garden a
Solvent Base Primer Application of Retaining wall Between inner and outer Elevation (inner) from Axis A
Surface Preparation Prior to Start Water Proofing of Retaining wall Between inner and outer Elevation (
Surface Preparation Prior to Start Water Proofing of foundation at South Administration Building (as Hi
Level, Location of Pile Cap (foundation) 189 to 192 (as Highlighted)
Installation of Rock and Boulder No. RB-112 (1st Layer)
Installation of Rock and Boulder No. RB-65a (2nd Layer)
Reinforcement Inspection for the Foundation and Side Walls of SBC-09
Installation of sub surface main line drainage upvc pipes class 4 (250mmØ) as per high lighted in dwg
2nd Coat Damp proofing for Boundary wall Foundation (Inner Face) @ Span (56, 57, 58, 59, 60, 61A &
1st Coat Damp proofing for Boundary wall Foundation (Inner Face) @ Span (56, 57, 58, 59, 60, 61A &
Steel Reinforcement for Wall @ Grid 1 to 7 or (1-7/Right Side), of Boundary wall at Aviary Garden, As
Excavation & Surface Preparation for foundation of boundary wall @ span 30, 32 & 33 @ Water Garden
Coordinates & Top Level of Blinding of boundary wall @span 30, 32 & 33 @ Water Garden at highlight
2nd Coat Cementitious Water Proofing for Blinding under boundary wall @ span 37, 38 & 39 @ Water
1st layers of Stack Boulders wall Installed at Planted bed of Boat Garden, at highlighted area in att
1st Coat Cementitious Water Proofing for Blinding under boundary wall @ span 37, 38 & 39 @ Water
Solvent Base Primer Coating (Both sides 500mm wide) for Blinding prior to Water proofing under bo
Surface preparation of Blinding prior to Water proofing under boundary wall @ span 37, 38 & 39 @ W
Excavation & Surface Preparation for foundation of boundary wall @ span 35 & 36 @ Water Garden at
Concrete pouring for Blinding of boundary wall @ span 34, 35 & 36 at Water Garden at highlighted ar
Coordinates & Top Level of Blinding of boundary wall @span 34, 35 & 36 @ Water Garden at highlight
Installation of Rock and Boulder No. RB-65 (2nd Layer)
Installation of Rock and Boulder No. RB-66 (First Layer)
Inspection for Casting the Blinding Concrete under the Manhole of Foul Water(FW1-2.2,FW1-3.1&FW1-3
"Inspection of Concrete Pouring for Wall and Slab of Cesspool-02 (As Highlighted)"
Concreting of Pile Cap (Foundation) 189 to 192 (as Highlighted)
Shuttering of Pile Cap (Foundation) 189 to 192 (as Highlighted)
Steel Reinforcement of Pile Cap (Foundation) 189 to 192 (as Highlighted)
Surface Preparatiob Prior to start Backfilling at Internal BLDG Zone 1A 1B (as Highlighted)
Concreting of Pile Cap (Foundation) 175 to 182 (as Highlighted)
Steel Reinforcement of Pile Cap (Foundation) 175 to 182 (as Highlighted)
Shuttering of Pile Cap (Foundation) 175 to 182 (as Highlighted)
Level, Location of Pile Cap (foundation) 175 to 182 (as Highlighted)
Level, Coordinates of 3 Columns for Colonnades (as Highlighted) Axis 02-AW(2nd)
Concreting of 3 Column/Buttress for Colonnades (zone 2P) as highlighted axis 02-AW as highlighted (2n
Shuttering of 3 Column/Buttress for Colonnades (zone 2P) as highlighted axis 02-AW as highlighted (2nd
Two Layer of 4mm thk Modified Bituminous WP Membrane at Mid Section of Slab at Tunnel 1 Zone 5 (as
Solvent Base Primer Coating at Mid Section of Slab at Tunnel 1 Zone 5 (as Highlighted)
Installation of rain water pipes; CI pipes (110mmØ) as per high lighted in dwg. at South Admin.
Level, Coordinates for Strip Footing Foundation in Zone 2A TIP (zone 7)
Steel Reinforcement of Column/Buttress for PC 185 Axis 02-AV / 02-2 (2nd)
Concreting for TIP Strip Footing Foundation at Zone 2A (as highlighted)
Formworks for TIP Strip Footing Foundation at Zone 2A (as highlighted)
Inspection of Block Work upto Final Height with Installation of Adjustable Angle, Filler Board and Insu
Installation of Foul Water Line of 110 & 160mmØ upvc pipes class 4 (FW9 to FW9-1 & Management Bld
Installation of Foul Water Line of 110 & 160mmØ upvc pipes class 4 (FW1-3 to Butterfly Garden)as p
WARNING TAPE installation for FOUL Water line at (FW1-3.1 to FW1-3.2). At highlighted area in the
BEDDING of gravel 38/" and Geotextile for Foul Water Line (160 & 110mmØ) in (FW1-3 to FW1-4). At h
Backfilling of gravel 38/" (300mm Thck) above of Foul Water Line (250mmØ) upvc pipes class 4 in (FW
Backfilling of gravel 38/" (300mm Thck) above of Foul Water Line (160mmØ) upvc pipes class 4 in (FW
BEDDING of gravel 38/" and Geotextile for Foul Water Line ( 160mmØ) in (FW9 to Management BLDG.).
Excavation for foul water line from (FW6-1 to FW6-3) prior to gravel bedding. At highlighted area in
'Excavation for foul line for ( FW1-2 to WAREHOUSE) prior to gravel bedding. At highlighted area in t
Cast of blinding concrete (16/20) for pipe incasement from (FW5 to FW6); the level is higher than the
Level, Location of 8 foundation in South Administation Building (as Highlighted) Zone 2C
Level, Location of Foundation in North Admin Building (as Highlighted) Zone 2Q
Installation of Box and UPVC straight conduit (Dia.25mm) for Power (13A Cleaner Socket WP, Fused
Installation of UPVC conduit (Dia. 25mm: 2Pcs each WIFI,ENT CAM & 32mm PTZ CAM) for Voice and Dat
Installation of UPVC conduit (Dia. 25mm: 2Pcs each ENT CAM & 32mmPTZ CAM ) for Security at the Cre
Installation of UPVC conduit (Dia. 25mm: 2Pcs each Speaker) for Fire Alarm at the Crescent-02 Axis
Inspection for Casting the Blinding Concrete under the Fundation of Seating Area (1) at Zone-K (SA-14)
Installation of Rock and Boulder No. RB-65 (First Layer)
Installation of Rock and Boulder No. RB-65a (First Layer)
Inspection of Formwork for the Beam of Seating Area (1) at Zone-G (SA-11) As Highlighted
Inspection of Steel Reinforcement for the Beam of Seating Area (1) at Zone-G (SA-11) As Highlighted
"Inspection of Formwork for the Foundation of Seating Area (1) at Zonek (SA-14) As Highlighted"
Inspection of Steel Reinforcement for the Foundation and Wall of Seating Area (1) at Zone-K (SA-14) As
Concreting for 8 foundation at South Administration Building (as Highlighted) Zone 2C
Shuttering for 8 foundation at South Administration Building (as Highlighted) Zone 2C
Steel Reinforcement for 8 foundation at South Administration Building (as Highlighted) Zone 2C
Steel Works for TIP Strip Footing Foundation at Zone 2A (as highlighted)
Application of Anti termite Below Mass Concrete for TIP Foundation at Zone 1P (as highlighted)
Steel Reinforcement of Column for Colonnades Cantilever (zone 2P) as highlighted 3 Columns axis 02 A
Application of Geo-Textile Sheet below foundation of Retaining wall Between Axis 01-AA to 01-Z (as Hig
Application of 1st Layer 4mm thk. APP Modified Bituminous WP membrane below foundation of Retainin
Application of Solvent Base Primer below foundation of Retaining wall Between Axis 01-AA to 01-Z (as H
Application of Cementitious Waterproofing below foundation of Retaining wall Between Axis 01-AA to 0
Surface Preparation Prior to start Water Proofing below foundation of Retaining wall Between Axis 01-A
Concreting of 6 Internal Foundation in Zone 2Q (North Admin) as highlighted
Shuttering of 6 Internal Foundation in Zone 2Q (North Admin) as highlighted
Steel Reinforcement of 6 Internal Foundation in Zone 2Q (North Admin) as highlighted
Single Layer of 4mm thick Modified Bituminous Water Proofing for Below Foundation PC 157 to 164 (zon
Protection Layer of Geo-textile Sheet and Screed Below Foundation PC 151 to 156 (zone 2K) as highligh
Protection Layer of 4mm THK bituminous protection Board Below Foundation PC 151 to 156 (zone 2K) as
Single Layer of 4mm thick Modified Bituminous Water Proofing for Below Foundation PC 151 to 156 (zon
Application of Solvent Base Primer for Below Foundation PC 151 to 156 (zone 2K) as highlighted
Surface Preparation Prior to Start Water proofing for Below Foundation PC 151 to 156 (zone 2K) as high
Installation of UPVC conduit (Dia.32mm 2Pcs. Each F1/CE & F2 ) for Lighting (Flood Light) at the Ent
Concrete pouring & Shuttering for Pedestal (Column's 05 no's @ Grids B / 1, 2 & 3 and A / 1 & 2) of
Installation of UPVC conduit (Dia.32mm 2Pcs. Each Socket Outlet & 25mm 1pc. Each CCTV) for Power
Installation of earthing clamps with conductor 70mm (5pcs.) for earthing reinforcement steel re-bar
Completion of Rock Boulder No.RB- 310 with Grouting
Inspection of Concrete Surface Preperation for external side of SBC-04 prior to start waterproofing (as
Inspection of Steel Reinforcement for the Foundation and Wall of Seating Area (1) at Zone-K (SA-17) As
Concreting of Column/Buttress for PC 183 Axis 02 AU
Shuttering of Column/Buttress for PC 183 Axis 02 AV
Steel Reinforcement for buttress BOI, BOV & BII, BIV 118 at PC 183 Axis 02-AU bottom to Mid CJ
Soil Preperation prior to start backfilling Wall Outside for SBC 1&2 - As Highlighted
Level, Coordinates of Butress Column for PC 183 As Highlighted (1st)
Steel Reinfocement for Tunnel 1 Service Access (near Axis 02-01) as Highlighted
Application of Protection layer of Geotextile Sheet & Screed for Below Foundation of MCPE 3 Zone 2E a
Soil Preparation prior to backfilling along the Boundary Wall (Inner Face) @ Grid (EXC4-11/12 to 27/
Inspection of Formwork for Wall and Slab of Cesspool-02
Inspection of Concrete Pouring for the Foundation of Seating Area (2) at Zone-J (SA-19) As Highlighte
Inspection of Concrete Pouring for the Foundation of Seating Area (2) at Zone-J (SA-01) As Highlighte
Inspection of Concrete Pouring for the Foundation of Seating Area (2) at Zone-N (SA-14) As Highlight
Inspection of Concrete Pouring for the Foundation of Seating Area (2) at Zone-N (SA-14) As Highlight
Inspection of Concrete Pouring for the Foundation of Seating Area (2) at Zone-N (SA-13) As Highlight
Installation of Box and UPVC straight conduit (Dia.25mm) for Power (13A Cleaner Socket,13A Twin
Excavation & Bed preparation for Sub Surface Main Line (250mm Part 2) at Physic Garden at highlight
1st layers of Stack Boulders wall Installed at Planted bed of Boat Garden, at highlighted area in att
Protection board for Wall & Wall foundations (Surround) @ Jetty # 2 at Boat Garden at highlighted ar
Protection board for Wall & Wall foundation (Surround) @ Jetty # 1 at Boat Garden at highlighted are
Steel Reinforcement for Wall @ Grid 1 to 12 & 17 to 27 or (1-11 & 15-23/Right Side), of Boundary wal
Concrete Pouring for Blinding of boundary wall @ span 37, 38 & 39 @ Water Garden at highlighted ar
Excavation & Surface Preparation for foundation of boundary wall @ span 37, 38 & 39 @ Water Garden
Coordinates & Top Level of Blinding of boundary wall @ span 37, 38 & 39 @ Water Garden at highligh
Crazy cut Stone cladding Installed for Boundary wall @ "Elevation "D to A" (Inner face) @ Maze Garde
Stone Cladding for Boundary wall (Inner Face) @ Span 14 & 15 of Water Garden, at Highlighted area
Aluminium Flashing & Sealant for Water Proofing of boundary wall Foundation (Inner face) @ span 5
Slated layer 4mm thk Modified Bituminous Water Proofing Membrane for boundary wall Foundation (I
Protection layer 4mm thk Bituminous protection board for boundary wall Foundation (Inner face) @
Single layer 4mm thk Modified Bituminous Water Proofing Membrane for boundary wall Foundation (I
Solvent Base Primer Coating of Water Proofing for boundary wall Foundation (Inner face) @ span 5 &
Aluminium Flashing & Sealant for Water Proofing of boundary wall Foundation (Outer face) @ span 5
Slated layer 4mm thk Modified Bituminous Water Proofing Membrane for boundary wall Foundation (
Protection layer 4mm thk Bituminous protection board for boundary wall Foundation (Outer face) @
Single layer 4mm thk Modified Bituminous Water Proofing Membrane for boundary wall Foundation (O
Solvent Base Primer Coating of Water Proofing for boundary wall Foundation (Outer face) @ span 5 &
Level, Location of Pile Cap (foundation) 187, 188, 193 & 194 (as Highlighted)
Surface preparation prior to Stone Cladding for boundary wall (Inner face) @ span 5, 6 & 7 @ Water
Level, Location of TIP Zone 1P Plain Concrete Below Strip Footing (as highlighted)
Aluminium Flashing & Sealant for Water Proofing of boundary wall Foundation (Inner face) @ span 1,
Slated layer 4mm thk Modified Bituminous Water Proofing Membrane for boundary wall Foundation (I
Protection layer 4mm thk Bituminous protection board for boundary wall Foundation (Inner face) @ s
Level, Location of Tunnel 1 Service access (as Highlighted)
Surface Preparation prior to start Water Proofing Membrane at Slab of Tunnel 2 Zone 5 (as Highlighted)
Concreting of Mass Concrete for TIP Foundation at Zone 1P (as highlighted)
Stone Cladding for Boundary wall (Outer Face) @ Grid (EXC3-20 to EXC4-52 to EXC4-44) at Physic Gard
Concreting of Pile Cap (Foundation) 187, 188, 193 & 194 (as Highlighted)
Shuttering of Pile Cap (Foundation) 187, 188, 193 & 194 (as Highlighted)
Stone Cladding for Boundary wall @ Span 1, 3 & 4 (Outer Face) at Water Garden, as per Attached Dr
Steel Reinforcement of Pile Cap (Foundation) 187, 188, 193 & 194 (as Highlighted)
Stone Cladding for Columns of Boundary wall @ Column No. C38A & C38B (All Sides), As per Attached
Shuttering of Mass Concrete for TIP Foundation at Zone 1P (as highlighted)
Application of Two Layer of 4mm THK odified Bituminous WP Membrane for Below Foundation of MCPE
Gravel 3/8 Bedding & Geotextile Surround for Sub-Surface Drain Pipes (110 Dia) @ Zone 7 to 4 to 9, at
Gravel 3/8 Bedding & Geotextile Surround for Sub-Surface Drain Pipes (315mm, 160mm & 110mm Dia) N
Concreting for Tunnel 1 Service Access (near MCPE) as Highlighted
Formworks for Tunnel 1 Service Access (near MCPE) as Highlighted
Soil Preparation for Foundation of Boundary wall @ Span 39 at Water Garden, as per highlighted in a
Installation of Foul Water Line of 250mmØ upvc pipes class 4 (FW6 to FW8)as per high lighted in dw
Installation of Foul Water Line of 250mmØ upvc pipes class 4 (FW5 to FW6)as per high lighted in dw
Installation of Foul Water Line of 160mmØ upvc pipes class 4 (FW6 to FW6-1)as per high lighted in d
'BEDDING of gravel 38/" and Geotextile for Foul Water Line ( 250 mm Ø) in (FW6 to FW8). At highligh
BEDDING of gravel 38/" and Geotextile for Foul Water Line ( 160 mm Ø) in (FW6 to FW6-1). At highlig
Installation of SUB surface upvc pipes class 4 perforated branches pipes (110mm Ø); as per high light
Installation of main line drainage upvc pipes class 4 and perforated branches pipes (160 & 110mm Ø
Completion of Rock Boulder No.RB- 323 with Grouting
Completion of Rock Boulder No.RB- 317 with Grouting
Completion of Rock Boulder No.RB- 313 with Grouting
Completion of Rock Boulder No.RB- 238 with Grouting
Inspection of Steel Reinforcement for the Foundation and Wall of Seating Area (2) at Zone-N (SA-14) As
Inspection of Steel Reinforcement for the Foundation and Wall of Seating Area (2) at Zone-N (SA-13) As
"Inspection of Formwork for the Foundation of Seating Area (2) at Zone-N (SA-14) As Highlighted"
"Inspection of Formwork for the Foundation of Seating Area (2) at Zone-N (SA-13) As Highlighted"
Coordinates & Top Level of Pedestal (Column's 05 no's @ Grids B / 1, 2 & 3 and A / 1 & 2) & Anchor
Installation of rain water pipes; CI pipes (100mmØ) as per high lighted in dwg.
Installation of rain water pipes; CI pipes (110mmØ) as per high lighted in dwg.
Shuttering and Concrete Pouring of Blinding for Retaining wall Shear Key and foundation Between Axis 0
Excavation for foul line for ( FW1-4 to Butterflygarden) prior to gravel bedding. At highlighted area i
'Excavation for foul line for ( FW1-2.2 to FW1-2.3) prior to gravel bedding. At highlighted area in the
'Excavation for foul line for ( FW1 to FW1-1) prior to gravel bedding. At highlighted area in the attac
Inspection for the Excavation of Storm Box Culvert - SBC-09 (As Highlighted)
Inspection of Concrete Pouring for the Foundation of Seating Area (2) at Zone-N (SA-05) As Highlighted
Inspection of Concrete Pouring for the Wall of Seating Area (3) at Zone-J (SA-15) As Highlighted
Inspection of Concrete Pouring for the Wall of Seating Area (2) at Zone-J (SA-26) As Highlighted
Inspection of Concrete Pouring for the Wall of Seating Area (2) at Zone-J (SA-25) As Highlighted
Inspection of Concrete Pouring for the Wall of Seating Area (2) at Zone-J (SA-03) As Highlighted
Inspection of Concrete Pouring for the Wall of Seating Area (2) at Zone-M (SA-15) As Highlighted
Inspection of Concrete Pouring for the Wall of Seating Area (2) at Zone-M (SA-12) As Highlighted
Inspection of Concrete Pouring for theWall of Seating Area (2) at Zone-M (SA-11) As Highlighted
"Inspection of Formwork for the Foundation of Seating Area (1) at Zone-K (SA-17) As Highlighted"
Level, Coordinates, Plain Concrete of Retaining wall Axis AA to Z Zone 1 Inner
Level, Coordinates, Excavation of Retaining wall Axis AA to Z Zone 1 Inner
Level, Location of Foundation in South Administation Building (as Highlighted) Zone 2C
Concreting of 12 Internal Foundation in Zone 2C (south admin BLDG.) as highlighted
Shuttering of 12 Internal Foundation in Zone 2C (south admin BLDG.) as highlighted
Steel Reinforcement of 12 Internal Foundation in Zone 2C (south admin BLDG.) as highlighted
Formworks & Concreting of Plain Concrete of foundation at South Administration Building (as Highlight
Application of Anti Termite under Plain Concrete of foundation at South Administration Building (as Hig
Level, Location of Plain Concrete below foundation in South Administation Building (as Highlighted) Zo
Level, Coordinates of Butress Column for PC 186 As Highlighted (2nd)
Soil Preparation under Boulder No.RB- 112
Inspection for Casting the Blinding Concrete at Storm Box Culvert 09
"Inspection of Formwork for the Wall of Seating Area (2) at Zone-N (SA-04) As Highlighted"
"Inspection of Formwork for the Wall of Seating Area (2) at Zone-J (SA-19) As Highlighted"
"Inspection of Formwork for the Wall of Seating Area (2) at Zone-J (SA-01) As Highlighted"
Inspection of Concrete Pouring for the Foundation of Seating Area (2) at Zone-N (SA-7) As Highlighted
Inspection of Concrete Pouring for the Foundation of Seating Area (2) at Zone-N (SA-6) As Highlighted
Inspection of Concrete Pouring for the Foundation of Seating Area (2) at Zone-N (SA-5) As Highlighted
Inspection of Steel Reinforcement for the Foundation and Wall of Seating Area (2) at Zone-N (SA-7) As H
Inspection of Steel Reinforcement for the Foundation and Wall of Seating Area (2) at Zone-N (SA-6) As H
Inspection of Steel Reinforcement for the Foundation and Wall of Seating Area (2) at Zone-N (SA-5) As H
"Inspection of Formwork for the Wall of Seating Area (2) at Zone-M (SA-15) As Highlighted"
Stone Cladding for Boundary wall (Inner Face) @ Grid (EXC4-29/30 to 41/42) at Physic Garden at high
"Inspection of Formwork for the Wall of Seating Area (2) at Zone-M (SA-12) As Highlighted"
Single layer 4mm thk Modified Bituminous Water Proofing Membrane for boundary wall Foundation (I
"Inspection of Formwork for the Wall of Seating Area (2) at Zone M(SA-11) As Highlighted"
Solvent Base Primer Coating of Water Proofing for boundary wall Foundation (Inner face) @ span 1,
Surface preparation prior to Water Proofing for boundary wall Foundation (Inner face) @ span 1, 3 &
Concrete pouring & Shuttering for Footings @ Grid (19-23/Left Side), of Boundary wall at Aviary Gard
2nd Layer Water proofing membrane for Wall & Wall foundations (Surround) @ Jetty # 2 at Boat Garde
2nd Layer Water proofing membrane for Wall & Wall foundations (Surround) @ Jetty # 1 at Boat Garde
Concrete Pouring & Shuttering for Wall @ Grid 45 to 51 or (1-5/Left Side), of Boundary wall at Aviary
Coordinates, levels & Alignment of Wall @ Grid 45 to 51 or (1-5/Left Side), of Boundary wall at Aviar
Coordinates & levels of Wall of Span 8 & 9 for boundary wall at Water Garden, as per Attached Drawi
Concrete Pouring & Shuttering for Wall of Span 8 & 9 for boundary wall at Water Garden, as per Att
Inspection of Steel Reinforcement for the Foundation and Wall of Seating Area (1) at Zone-K (SA-17) As
Steel Reinforcement for Wall of Span 8 & 9 for boundary wall at Water Garden, as per Attached Draw
Surface preparation prior to Stone Cladding for boundary wall (Inner faces) @ span 22, 23, 24 & 25
Surface preparation prior to Stone Cladding for boundary wall (Inner faces) @ span 18, 19, 20 & 21
Concreting of Column/Buttress for PC 186 Axis 02 AV / 02 1 (2nd)
Shuttering of Column/Buttress for PC 186 Axis 02 AV / 02 1 (2nd)
Concreting for Retaining wall (wall) At Axis AD to AF (as Highlighted)
Application of Solvent Base Primer for Below Foundation PC 157 to 164 (zone 2L) as highlighted
Surface Preparation Prior to Start Water proofing for Below Foundation PC 157 to 164 (zone 2L) as highl
Application of Solvent Base Primer for Below Foundation PC 125 to 132 (zone 2F) as highlighted
Surface Preparation Prior to Start Water proofing for Below Foundation PC 125 to 132 (zone 2F) as high
Application of Solvent Base Primer for Below Foundation PC 133 to 138 (zone 2G) as highlighted
Surface Preparation Prior to Start Water proofing for Below Foundation PC 133 to 138 (zone 2G) as high
Putting of WARNING TAPE for Storm Water line put fall B for (MH-B-01 to MH-B-02). At highlighted
'Excavation for foul line for ( FW1-2 to FW1-2.2) prior to gravel bedding. At highlighted area in the a
Steel Reinforcement for Pedestal (Column's 05 no's @ Grids B / 1, 2 & 3 and A / 1 & 2) & Anchor bol
Concrete Pouring & Shuttering for Wall of Span 11 for boundary wall at Water Garden, as per Attach
Inspection for Casting the Blinding Concrete under the Fundation of Seating Area (2) at Zone-M (SA-10)
Concrete Pouring & Shuttering for Wall of Span 10 for boundary wall at Water Garden, as per Attach
Coordinates & Levels for Wall of Span 11 for boundary wall at Water Garden, as per Attached Drawin
Inspection for Casting the Blinding Concrete under the Fundation of Seating Area (2) at Zone-M (SA-8) A
Coordinates & Levels for Wall of Span 10 for boundary wall at Water Garden, as per Attached Drawin
Steel Reinforcement for Footings @ Grid (19-23/Left Side), of Boundary wall at Aviary Garden, As per
Coordinates & Top Level of Pedestal (Column's 05 no's @ Grids B / 1, 2 & 3 and A / 1 & 2) & Anchor
Inspection for Casting the Blinding Concrete under the Fundation of Seating Area (2) at Zone-M (SA-9) A
Coordinates & Top level of Footing of Boundary wall (Grid 19-23/Left Side) at Aviary Garden, As per H
Installation of Rock and Boulder No. RB-262 (3rd Layer)
Surface Preperation prior to start backfilling at Road Constrution From ST 2+140 to ST 1+840 as per t
Soil Preparation under Boulder No.RB- 326a
Excavation & Bed Preparation for Sub-Surface Drain Pipes (110 Dia) @ Zone 7 to 4 to 9, at Butterfly G
Excavation & Surface Preparation for foundation of boundary wall @ span 35 & 36 @ Water Garden at
Level, Coordinates of 3 Columns for Colonnades (as Highlighted) Axis 02-AT AW(2nd)
Application of Protection Layer 4mm thk Bituminous Protection Board for Foundation of Internal Buildi
Application of Two Coats Bituminous Damp Proofing Coating for Foundation of Internal Building at Zon
Inspection to Check Surface Preparation for Strip Footing Between PC (99 to 101)
Inspection for application of Bituminous Damp Proofing (1st Coat) on top of Primer for Foundation and
Inspection for application of Bituminous Damp Proofing (1st Coat) on top of Primer for Foundation and
Concrete Surface Preperation prior to start the Waterproofing at Seating Area (3) at Zone-G-M (SA-9,10
Notification to Start Road Constrution From ST 00 to ST 2149 as per the approved Shop Drawing No # 1
'Excavation for foul line for ( FW9-1 to Management Bldg.) prior to gravel bedding. At highlighted are
'Backfilling of gravel 38/" (300mm Thck.) above upvc pipes class 4 (160mm Ø) for Foul Water Line (F
Backfilling of gravel 38/" (300mm thck) above upvc pipes class 4 (160mm Ø) for Foul Water Line (FW11
Installation of Box and UPVC straight conduit (Dia.25mm) for External Lighting at the Maintenance & M
Inspection for application of Protection Board on top of Damp Proofing for External wall and Top Slab of
Excavation & Bed Preparation for Sub-Surface Drain Pipes (315mm, 160mm & 110mm Dia) Near Zone 2,
Inspection of Block Work upto Final Height with Installation of Adjustable Angle and Filler Board at
Gravel 3/8 Bedding & Geotextile Surround for Sub Surface Main Line (250mm, 200mm & 160mm Part 2
Excavation & Bed preparation for Sub Surface Main Line (250mm, 200mm & 160mm Part 2) and (110m
Stone Cladding for Columns of Boundary wall @ Column No. C35, C36 & C37 (All Sides), As per Attach
Shuttering of Column/Buttress for PC 185 Axis 02 AV
Shuttering of Column/Buttress for PC 184 Axis 02 AU
Two Coat Bituminous Damp Proofing Coating of foundation at South Administration Building (as Highlig
Base Primer Coating (50x50% Bitumin and Water) of foundation at South Administration Building (as Hi
Steel Reinforcement of Column/Buttress for PC 186 Axis 02 AV / 02 1 (2nd)
Concreting of 3 Column/Buttress for Colonnades (zone 2P) as highlighted axis 02-AW AT as highlighted
Shuttering of 3 Column/Buttress for Colonnades (zone 2P) as highlighted axis 02-AW AT as highlighted
Application of Base Primer Coating (50% x 50% Bitumin & Water) of Foundation for Internal Building at
Installation of sub surface main line drainage upvc pipes class 4 (160 & 110mmØ) as per high lighted
Concrete Surface Preperation prior to start the Waterproofing at Seating Area (3) at Zone-G-K (SA-22,2
Inspection for application of Protection Layer 4mm Thick Bituminous Protection Board on top of Bitum
Inspection for application of Bituminous Damp Proofing (2nd Coat) on top of Primer for Foundation and
"Inspection of Formwork for the Wall of Seating Area (2) at Zone-J (SA-03) As Highlighted"
"Inspection of Formwork for the Wall of Seating Area (2) at Zone-J (SA-25) As Highlighted"
"Inspection of Formwork for the Wall of Seating Area (2) at Zone-J (SA-26) As Highlighted"
"Inspection of Formwork for the Wall of Seating Area (3) at Zone-J (SA-15) As Highlighted"
Inspection for application of Base Primer (50%x50% Bitumin & Water) on Foundation and wall at Saeting
Inspection for application of Bituminous Damp Proofing (1st Coat) on top of Primer for Foundation and
Inspection for application of Bituminous Damp Proofing (1st Coat) on top of Primer for Foundation and
Concrete Surface Preperation prior to start the Waterproofing For Prayer Area at Zone-I As Highlighted
Inspection for application of Bituminous Damp Proofing (1st Coat) on top of Primer for Foundation and
Inspection for application of Bituminous Damp Proofing (2nd Coat) on top of Primer for Foundation and
'Excavation for foul water line for ( FW1-3 to FW1-4) prior to gravel bedding. At highlighted area in t
Installation of pipes for Foul Water line ; 160mm Øupvc class 4(FW1-3.1 to FW1-3.2); as per high ligh
'Bedding of gravel 38/" and geotextile sorrounding upvc pipes class 4 (160mm Ø) for Foul Water Line
Installation of earthing clamps with conductor 70mm (2pcs.) for earthing reinforcement steel re-bar at
Notification to Start Excavation for SBC.06 as per the approved Layout and Pipe inverted Level 877.162
Inspection of Concrete Pouring for the Wall of Seating Area (3) at Zone-N(SA-12) As Highlighted
Inspection of Concrete Pouring for the Wall of Seating Area (3) at Zone-I(SA-18) As Highlighted
Inspection of Concrete Pouring for the Wall of Seating Area (3) at Zone-M(SA-8) As Highlighted
Inspection for casting the 50mm thick Screed Protection under foundation of Cesspool-5 (As Highlighted
Inspection for casting the 50mm thick Screed Protection under foundation of Cesspool-4 (As Highlighted
Inspection for application of Protection layer of Geo-Textile Sheet-180gr/sqm on Top of Bituminous w
Inspection for application of Protection layer of Geo-Textile Sheet-180gr/sqm on Top of Bituminous w
Inspection for application of Protection Layer 4mm Thick Bituminous Protection Board on top of Bitum
Inspection for application of Bituminous Damp Proofing (2nd Coat) on top of Primer for Foundation and
Inspection for application of Bituminous Damp Proofing (1st Coat) on top of Primer for Foundation and
Concrete Surface Preperation prior to start the Waterproofing at Seating Area (2) at Zone-K (32) As High
Inspection for application of Base Primer (50%x50% Bitumin & Water) on Foundation and wall at Saeting
Inspection for application of Base Primer (50%x50% Bitumin & Water) on Foundation and wall at Saeting
Inspection for application of Base Primer (50%x50% Bitumin & Water) on Foundation and wall at Saeting
Inspection for application of Bituminous Damp Proofing (1st Coat) on top of Primer for Foundation and
Steel Reinforcement for Wall of Span 11 for boundary wall at Water Garden, as per Attached Drawing
Steel Reinforcement for Wall of Span 10 for boundary wall at Water Garden, as per Attached Drawing
Surface preparation Prior to Stone Cladding for Boundary wall Outer & Inner Face @ Grid (EXC1-12/1
Soil Preparation for Foundation of Boundary wall @ Span 39 at Water Garden, as per highlighted in a
Bedding of gravel 38/" and geotextile sorrounding upvc pipes class 4 (160mm Ø) for Foul Water Line
Installation of fire protection pipes and fittings ERW pipes (sch. 40) size: 25, 32, 40, 50, & 65mm Ø; as
Installation of earthing clamps with conductor 70mm (2pcs.) for earthing reinforcement steel re-bar a
Installation of Rock and Boulder No. RB-288 (4th Layer)
Inspection for Casting the Blinding Concrete under the Fundation of Seating Area (1) at Zone-N (SA-14)
Inspection of Concrete Pouring for the Foundation of Seating Area (2) at Zone-N(SA-4) As Highlighted
Inspection of Concrete Pouring for the Foundation of Seating Area (2) at Zone-M (SA-15) As Highlighted
Inspection of Concrete Pouring for the Foundation of Seating Area (2) at Zone-M (SA-12) As Highlighted
Inspection of Concrete Pouring for the Foundation of Seating Area (2) at Zone-M (SA-11) As Highlighted
Inspection of Concrete Pouring for the Foundation of Seating Area (2) at Zone-J (SA-19) As Highlighted
Concrete Surface Preperation prior to start the Waterproofing For Prayer Area at Zone-J As Highlighted
"Inspection of Steel reinforcement for Slab of Cesspool-02 As Highlighted"
"Inspection for application of 2nd Layer of 4mm thick Modified Bituminous Waterproofing on top of Pr
"Inspection for application of 2nd Layer of 4mm thick Modified Bituminous Waterproofing on top of Pri
Inspection of Concrete Pouring for the Foundation of Seating Area (2) at Zone-J (SA-1) As Highlighted
Steel Reinforcement for Wall @ Grid 45 to 51 or (13-19/Left Side), of Boundary wall at Aviary Garden,
Aluminium Flashing & Sealant for Water proofing of boundary wall Foundation (Inner face) @ span 22
Slated Layer of 4mm thk Modified Bituminous Water proofing membrane for boundary wall Foundation
Application of Protection Layer of Non-woven Geotextile sheet Below Foundation (Inner elevation) of Re
Application of Protection Layer of 4mm THK. Bituminous Protection Board Below Foundation (Inner eleva
Application of 1st and 2nd Layer 4mm THK modified Bituminous Water Proofing Membrane Below Foundati
Level, Location for Retaining wall - Bottom and top of Wall between Axis AD to AF Zone 1 inner
Application of Protection Layer of Geotextile Sheet 180 gr. Per sq.m. and 30mm Screed for TIP Under St
Application of Single Layer of 4mm thk. Modified Bituminous Water Proofing Membrane 200gr. Per sq.m.
Surface Preparation Prior to Start Water Proofing of Foundation for Internal Building at Zone 1A and 1B
Application of Cementitious Waterproofing Below Foundation (Inner elevation) of Retaining wall (as hig
Installation of Box and UPVC straight conduit (Dia.25mm) for Power (13A Cleaner Socket WP,13A
Level, Location of Plain concrete below foundation in South Administration Building (as highlighted)
'Excavation for foul line for ( FW6 to FW6-1) prior to gravel bedding. At highlighted area in the attac
Installation of stub-up UPVC conduit for Lighting (Power-Dia.50mm,32mm ) at the Boat Garden Ground
"Inspection of Formwork for the Wall of Seating Area (3) at Zone-M (SA-8) As Highlighted"
"Inspection of Formwork for the Wall of Seating Area (3) at Zone-I (SA-18) As Highlighted"
Inspection for Casting the Blinding Concrete under the Fundation of Seating Area (2) at Zone-N (SA-17)
"Inspection for application of 1st Layer of 4mm thick Modified Bituminous Waterproofing on top of Pri
"Inspection for application of 1st Layer of 4mm thick Modified Bituminous Waterproofing on top of Pri
Inspection for application of Solvent Base Primer Coating on Top of Blinding concrete under the founda
Inspection for application of Solvent Base Primer Coating on Top of Blinding concrete under the founda
Inspection for Casting the Blinding Concrete under the Fundation of Seating Area (2) at Zone-M (SA-10)
Inspection for Casting the Blinding Concrete under the Fundation of Seating Area (2) at Zone-M (SA-8) A
Inspection for Casting the Blinding Concrete under the Fundation of Seating Area (2) at Zone-M (SA-9) A
Inspection for Casting the Blinding Concrete under the Fundation of Seating Area (2) at Zone-N (SA-7) A
Inspection for Casting the Blinding Concrete under the Fundation of Seating Area (2) at Zone-N (SA-6) A
Soil Preparation for Foundation of Boundary wall @ Span 38 at Water Garden, as per highlighted in a
Crazy cut Stone cladding Installed for Boundary wall @ "Elevation "D" to "C" & Some Part of "D to A"
Coordinates & Top Level of Blinding of boundary wall @ span 37 & 38 @ Water Garden at highlighted
Coordinates & Top Level of Blinding of boundary wall @ span 35 & 36 @ Water Garden at highlighted
Concrete Pouring & Shuttering of Kicker (Inside) for boundary wall @ Span 11 at Water Garden, as p
Coordinates & Top Level of Kicker (Inside) for boundary wall @Span 11 at Water Garden, as per Atta
Application of Protection Layer of 4mm thk Bituminous Protection Board Below Foundation PC 7 to 12 (
Level, Location of Plain Concrete below foundation in Internal Buildings (as Highlighted) Zone 2R
Level, Coordinates of Butress Column for PC 184 As Highlighted (2nd)
Formworks & Concreting of Plain Concrete of foundation at Internal Building (as Highlighted) Zone 2R
Application of Anti Termite under Plain Concrete of foundation at Internal Building (as Highlighted) Zon
Application of Protection Layer of 4mm thk Bituminous Protection Board Below Foundation PC 13 to 20
Application of Protection Layer of geotextile sheet 180 gr. Per sqm and screed Below Foundation PC 13
Application of Single Layer of 4mm thk modified bituminous waterproofing membrane Below Foundation
Application of Solvent Base Primer Below Foundation PC 13 to 20 (zone 1C) as highlighted
Application of Protection Layer of geotextile sheet 180 gr. Per sqm and screed Below Foundation PC 7 t
Application of Single Layer of 4mm thk modified bituminous waterproofing membrane Below Foundation
Application of Solvent Base Primer Below Foundation PC 7 to 12 (zone 1B) as highlighted
Installation of pipes for Foul Water line ; 160mm Øupvc class 4(FW11 to FW12-2); as per high lighted
Steel Reinforcement for Retaining Wall (Foundation) (as Highlighted at AXIS AD TO AB)
Soil Preparation under Boulder No.RB- 286
Installation of Rock and Boulder No. RB-262 (2nd Layer)
Installation of Rock and Boulder No. RB-241 (Full Boulder - 4 Layers)
Installation of Rock and Boulder No. RB-245 (Full Boulder - 5 Layers)
Installation of Rock and Boulder No. RB-288 (5th Layer)
Installation of Rock and Boulder No. RB-151 (Full Boulder - 6 Layers)
Inspection for Installation of Stone cladding for the Wing Wall of the Culverts at Western Wadi (as Highl
"Inspection of Formwork for the Foundation of Seating Area (2) at Zone-N (SA-4) As Highlighted"
Surface preparation prior to Stone Cladding for boundary wall (Inner & Outer faces) @ span 5 & 6 @
"Inspection of Formwork for the Foundation of Seating Area (2) at Zone-J (SA-19) As Highlighted"
Surface preparation prior to Water Proofing for boundary wall Foundation (Inner & Outer faces) @ s
"Inspection of Formwork for the Foundation of Seating Area (2) at Zone-J (SA-11) As Highlighted"
Aluminium Flashing & Sealant for waterproofing of boundary wall (Inner Face) @ span 18, 19, 20 & 21
Slated layer of 4mm thk Modified Bituminous waterproofing membrane for boundary wall (Inner Face)
Protection Layer of 4mm thk Bituminous protection board Water proofing for boundary wall Foundati
Single layer 4mm thk Modified Bituminous Water Proofing Membrane for boundary wall Foundation (I
Solvent Base Primer Coating of Water Proofing for boundary wall Foundation (Inner face) @ span 22,
Surface preparation prior to Water Proofing for boundary wall Foundation (Inner face) @ span 22, 23
Aluminium Flashing & Sealant for Water proofing of boundary wall foundation Outer face @ span 22,
Slated Layer of 4mm thk Modified Bituminous Water proofing for boundary wall Outer face @ span 22
Protection Layer of 4mm thk Bituminous protection board Water proofing for boundary wall Outer fa
Single layer 4mm thk Modified Bituminous Water Proofing Membrane for boundary wall Foundation Ou
Aluminium Flashing & Sealant for Water proofing of boundary wall foundation Outer face @ span 1, 3
Slated Layer of 4mm thk Modified Bituminous Water proofing for boundary wall Outer face @ span 1,
Protection Layer of 4mm thk Bituminous protection board Water proofing for boundary wall Outer fac
Steel Reinforcement of Column for Colonnades Cantilever (zone 2P) as highlighted 3 Columns axis 02 A
Level, Location of Plain Concrete below foundation in North Administation Building (as Highlighted) Zo
Formworks & Concreting of Plain Concrete of foundation at North Administration Building (as Highlight
Application of Anti Termite under Plain Concrete of foundation at North Administration Building (as Hi
Installation of stub-up PVC conduit for Lighting (Power-Dia.50mm 2pcs& Grounding - Dia.32mm 1pc. Ea
Excavation for foul line for ( FW1-3.1 to FW1-3.2) prior to gravel bedding. At highlighted area in the
" Mock up Inspection for Stone Boulder Grounting (Boulder No. RB-276) Saveto Color NO# 65 (Mock u
" Mock up Inspection for Stone Boulder Grounting (Boulder No. RB-276) White Sanding,White Cement
"Mock up inspection of Wall Stone Cladding for Seating Area (1) at Zone-G (SA-11) - As Highlighted (No
"Inspection of Formwork for the Foundation of Seating Area (2) at Zone-M (SA-15) As Highlighted"
"Inspection of Formwork for the Foundation of Seating Area (2) at Zone-M (SA-12) As Highlighted"
"Inspection of Formwork for the Foundation of Seating Area (2) at Zone-M (SA-11) As Highlighted"
Soil Preperation prior to start backfilling Sub-Grade of Seating Area (1) (SA-12) - As Highlighted
Soil Preperation prior to start backfilling Sub-Grade of Seating Area (3) (SA-21) - As Highlighted
Inspection of Steel Reinforcement for the Foundation and Wall of Seating Area (2) at Zone-M (SA-12) As
Inspection of Steel Reinforcement for the Foundation and Wall of Seating Area (2) at Zone-M (SA-11) As
Inspection of Steel Reinforcement for the Foundation and Wall of Seating Area (2) at Zone-N (SA-4) As H
Inspection of Steel Reinforcement for the Foundation and Wall of Seating Area (2) at Zone-J (SA-1) As H
Inspection of Steel Reinforcement for the Foundation and Wall of Seating Area (3) at Zone-J (SA-15) As
Excavation and Surface Preperation prior to start backfilling Sub-Base under Footing of Seating Area (2)
Inspection of Steel Reinforcement for the Foundation and Wall of Seating Area (2) at Zone-M (SA-15) As
Inspection for Casting the Blinding Concrete under the Fundation of Seating Area (2) at Zone-N (SA-5) A
Concrete pouring & Shuttering for Wall of Span 7 for boundary wall at Water Garden, as per Attache
Steel Reinforcement for Wall of Span 7 for boundary wall at Water Garden, as per Attached Drawings
Coordinates & Top Level of Wall of Span 7 for boundary wall at Water Garden, as per Attached Drawi
Soil Preparation for Foundation of Boundary wall @ Span 30 & 32 at Water Garden, as per highlighted
Stone Cladding for Boundary wall @ Span 22, 23, 24 & 25 (Outer Face) at Water Garden, as per Atta
Stone Cladding for Boundary wall @ Span 18, 19, 20 & 21 (Outer Face) at Water Garden, as per Atta
Stone Cladding for Column's C39, C40 & C41 (All Sides) of Boundary wall, As per Attached Highlighted
Stone Cladding for Boundary wall Inner Face @ Span 45, 46, 47 & 48, As per Attached Highlighted Dra
Concreting for Slab of Tunnel 1 (near Axis 02-1) as highlighted
Shuttering for Slab of Tunnel 1 (near Axis 02-1) as highlighted
Steel reinforcement for Slab of Tunnel 1 (Axis 02/1) as highlighted
Surface Preparation Prior to Start Water Proofing of foundation at South Administration Building (as Hi
25mm Thick Epoxy Grout (MASTER SEAL 915) for Zone 2N and 2M as highlighted
Level, Coordinates, slab of Tunnel 1 (Near Axis 02-1) as highlighted
Level, Location of Plain Concrete below foundation in South Administation Building (as Highlighted) Zo
Steel Reinforcement for buttress BOI, BOV & BII, BIV 119 at PC 185 and 186 Axis 02-AV bottom to Mid C
Installation of pipes for Foul Water line ; 160mm Øupvc class 4(FW1-3 to FW1-3.1); as per high light
Bedding of gravel 38/" and geotextile sorrounding upvc pipes class 4 (160mm Ø) for Foul Water Line
Installation of Rock and Boulder No. RB-262 (1st Layer)
"Mock up Inspection of Stamped Concrete for Seating areas Type (1,2,3) at Zone-F near Tolite-2 (Mo
Concrete Surface Preperation prior to start the Waterproofing at Play Area (3) at Zone-K As Highlighted
Inspection for application of Protection Layer 4mm Thick Bituminous Protection Board on top of Bitum
Inspection of Concrete Pouring for the Foundation of Seating Area (2) at Zone-J (SA-3) As Highlighted
Inspection of Concrete Pouring for the Foundation of Seating Area (2) at Zone-J (SA-26) As Highlighted
Inspection of Concrete Pouring for the Foundation of Seating Area (2) at Zone-J (SA-25) As Highlighted
Inspection of Concrete Pouring for the Wall of Seating Area (3) at Zone-M (SA-11) As Highlighted
Inspection of Concrete Pouring for the Wall of Seating Area (3) at Zone-M (SA-10) As Highlighted
Inspection of Concrete Pouring for the Wall of Seating Area (3) at Zone-M (SA-9) As Highlighted
Formworks & Concreting of Plain Concrete of foundation at South Administration Building (as Highlight
Application of Anti Termite under Plain Concrete of foundation at South Administration Building (as Hig
Inspection of Concrete Pouring for the Wall of Seating Area (3) at Zone-N (SA-13) As Highlighted
Application of Solvent Base Primer for Below Foundation of MCPE 3 Zone 2E
Inspection of Concrete Pouring for the Wall of Seating Area (3) at Zone-N (SA-5) As Highlighted
Surface Preparation Prior to Start Water proofing for Below Foundation of MCPE 3 Zone 2E
Application of Solvent Base Primer Below Foundation (Inner elevation) of Retaining wall (as highlighted)
Surface Preparation Prior to Start Water proofing for Below Foundation (Inner elevation) of Retaining wa
Soil Preparation for Foundation of Boundary wall @ Span 33, 34, 35, 36 & 37 at Water Garden, as per
Formworks & Concreting of Plain Concrete of foundation at North Administration Building (as Highlight
Geo Textile (Both sides 500mm wide) on Blinding Under Foundation of wall @ Jetty # 2 at Boat Garden
Geo Textile (Both sides 500mm wide) on Blinding Under Foundation of wall @ Jetty # 1 at Boat Garden
Application of Anti Termite under Plain Concrete of foundation at North Administration Building (as Hi
Application of Geotextile Sheet 180 g per sq.m. loose laid and Screed (Inner and outer elevation) of Ret
Level, Location of Plain Concrete below foundation in North Administation Building (as Highlighted) Zo
Coordinate and top level of foundation cencrete in retaining wall Between Axis AD to AB as highlighted
Installation of pipes for Foul Water line ; 250mm Øupvc class 4(FW8 to FW9); as per high lighted in
'Bedding of gravel 38/" and geotextile sorrounding upvc pipes class 4 (250mm Ø) for Foul Water Line
'Excavation for foul line for ( FW5 to FW6) prior to gravel bedding. At highlighted area in the attache
Level, Coordinates of Butress Column for PC 184 As Highlighted (2nd)
Level, Location of Tunnel 1 Service access (as Highlighted)
Level, Location of Plain Concrete below foundation in South Administation Building (as Highlighted) Zo
Level, Location for Retaining wall - Bottom and top of Wall between Axis AD to AF Zone 1 inner
Concreting for Tunnel 1 Service Access (near MCPE) as Highlighted
Formworks for Tunnel 1 Service Access (near MCPE) as Highlighted
Steel Reinfocement for Tunnel 1 Service Access (near MCPE) as Highlighted
Formworks & Concreting of Plain Concrete of foundation at South Administration Building (as Highlight
Application of Anti Termite under Plain Concrete of foundation at South Administration Building (as Hig
Concreting for Retaining wall (wall) At Axis AD to AF (as Highlighted)
Shuttering for Retaining wall (wall) At Axis AD to AF (as Highlighted)
Steel Reinforcement for Retaining wall (wall) At Axis AD to AF (as Highlighted)
Concrete Pourng for Retaining Wall (Foundation) (as Highlighted at AXIS AD TO AB)
Shuttering for Retaining Wall (Foundation) (as Highlighted at AXIS AD TO AB)
Installation of UPVC straight conduit (Dia.25mm 13A Twin Socket Outlet-1Pc.each,Wall Mounted 13
Aluminium Flashing & Sealant for boundary Wall (Inner & Outer Faces) @ Grid (EXC4-01/02 to 09/10
Inspection for Casting the Blinding Concrete under the Fundation of Seating Area (1) at Zone-J (SA-8) As
Slated layer of 4mm thk Modified Bituminous waterproofing membrane for boundary Wall (Inner & O
Protection layer of 4mm thk Bituminous Protection Board for Boundary wall (Inner & Outer Faces)
Single Layer Modified Bituminous Waterproofing Membrane for Boundary wall (Inner & Outer Faces)
Installation of Rock and Boulder No. RB-245 (1st Layer)
Installation of Rock and Boulder No. RB-288 (3rd Layer)
Concrete Surface Preperation prior to start the Waterproofing at Seating Area (3) at Zone-K (25) As High
Concrete Surface Preperation prior to start the Waterproofing at Seating Area (2) at Zone-K (30) As High
Concrete Surface Preperation prior to start the Waterproofing at Seating Area (2) at Zone-K (29) As High
Concrete Surface Preperation prior to start the Waterproofing at Seating Area (2) at Zone-K (28) As High
Excavation for foul line for ( FW1-1 to FW1-2) prior to gravel bedding. At highlighted area in the atta
Excavation for foul line for ( FW11 to FW12-2) prior to gravel bedding. At highlighted area in the att
First layer of damp proof coating of boundary wall - inner face, span 76-77.
Surface preparation prior to start waterproofing of Boundary Wall inner, Span 43 & 44.
Surface preparation prior to start waterproofing of Boundary Wall - inner face , Span 1, 15-17.
Inspection for protection board of footing prior to start backfilling at Ticket Booth 2.
Repairing for foundation upstand to maintain leveling prior to install Kicker Formwork.
Setting of CMU (first layer) for External Wall of Management Building
Setting out of Grooves for Exterior Elevation as per attached drawing prior to install Grooves for Fire
Notification to start laying of Masonry Blocks - "First Layer"
Installation of UPVC straight conduit (Dia.25mm 1Pc.each - Fire Telecom Call Point,Fire Alarm Flashi
Installation of UPVC straight conduit (Dia.25mm Door Release-1Pc.each,CAM-1pcs each,Magnetic Doo
Installation of UPVC straight conduit (Dia.25mm 1pc. Each -DATA,TEL.&CAM) and Box (1pc. Each - D
'Excavation for Foul Water line in North Administration ( crescent) prior to bedding gravel & geotextil
'Excavation for Foul Water line in South Administration ( crescent) prior to bedding gravel & geotestil
Stone Cladding for Boundary wall (Inner Face) @ Grid (EXC4-11/12 to 27/28) at Physic Garden at high
2nd Coat of Bituminous Damp proofing for Boundary wall foundation (Outer Face) at Elevation "B to
1st Coat of Bituminous Damp proofing for Boundary wall foundation (Outer Face) at Elevation "B to
Surface preparation Prior to Stone Cladding for Boundary wall (Inner Face) @ span 1, 3 & 4 at Water
Concrete Pouring & Shuttering of Wall upto 3.8m Height of Boundary wall, Grid 6-12/Left Side or (Grid
Coordinates & Top Level of Kicker (Inside) of boundary wall Span 8, 9 & 10 at Water Garden, as per
Concrete Pouring & Shuttering for Kicker (Inside) of boundary wall Span 8, 9 & 10 at Water Garden,
Steel Reinforcement for Kicker Inside of boundary wall Span 8, 9 & 10 at Water Garden, as per Attac
MOCK UP of FIRST FIX water supply (copper pipes 1/2") with rubber insulation INSIDE WALL as per ap
Level, Coordinates of Butress Column for PC 185 As Highlighted
Level, Coordinates of Foundation Concrete as Highlighted in Internal Buildings Zone 1A & 1B
Concreting for Internal Building (Zone 1A & 1B) Foundation as Highlighted
Shuttering for Internal Building (Zone 1A & 1B) Foundation as Highlighted
Steel Reinfocement for Internal Building (Zone 1A & 1B) Foundation as Highlighted
Concreting of Column/Buttress for PC 184 Axis 02 AV / 02 1 (2nd)
Installation of main line drainage upvc pipes class 4 and perforated branches pipes (160 & 110mm Ø
Shuttering of Column/Buttress for PC 184 Axis 02 AU / 02 1 (2nd)
Steel Reinforcement of Column/Buttress for PC 184 Axis 02 AU / 02 1 (2nd)
Installation of upvc pipes class 4 110mm Ø perforated branches pipes for Subsurface drainage ; as pe
Installation of Rock and Boulder No. RB-288 (5th Layer)
Soil Preperation prior to start backfilling Sub-Grade of Seating Area (3) (SA-20) - As Highlighted
Inspection for application of Base Primer (50%x50% Bitumin & Water) on Foundation and wall at Saeting
Concrete Surface Preperation prior to start the Waterproofing at Seating Area (3) at Zone-N,K (SA-3,24)
Inspection for Casting the Blinding Concrete under the Footing of Seating Area (1) at Zone-K (SA-17) As
Inspection for Casting the Blinding Concrete under the Footing of Seating Area (2) at Zone-N (SA-14) As
Inspection for Casting the Blinding Concrete under the Footing of Seating Area (2) at Zone-N (SA-13) As
Excavation and Surface Preperation prior to start backfilling Sub-Base under Footing of Seating Area (2)
Inspection for application of Base Primer (50%x50% Bitumin & Water) on Foundation and wall at Saeting
Sand backfilling 300mm above the pipe (315 mmØ upvc pipes) foul water drinage lifting line )pt. 49 t
Installation of thrust block for the pipe (315 mmØ upvc pipes) foul water drinage lifting line )pt. 49 t
Installation of pipes for Storm Water line out fall B; 315mm Øupvc class 4(G-B-7 to MH-B-02); as per
Soil Preparation prior to start Backfill along the boundary wall Outer side @ Grid (EXC4-01/02 to 0
Coordinates, Alignment & Levels of Wall upto 3.8m Height of Boundary wall, Grid 6-12/Left Side or (Gr
Primer coat Damp proofing for Boundary wall (Inner Face) @ Span 38 & 39, As per Highlighted in At
Surface Preparation Prior to Primer coat Damp proofing for Boundary wall (Inner Face) @ Span 38 &
Primer coat of Damp proofing for Boundary wall (Inner Face) @ Span (56, 57, 58, 59, 60, 61A & 61B) &
Crazy cut Stone cladding Installed for Boundary wall @ "Elevation "B" to "C" (Inner face) @ Maze Gar
Primer coat prior to Damp proofing for Boundary wall foundation (Outer Face) at Elevation "B to C"
Surface Preparation prior to Water proofing for Boundary wall foundation (Outer Face) at Elevation
Stone Cladding for Boundary wall Inner Face @ Span 42, 43 & 44, As per Attached Highlighted Drawin
Shuttering and Concreting of Foundation for Internal Building (Zone 2Q North Admin BLDG) as Highlight
Steel Reinforcement of Foundation for Internal Building (Zone 2Q North Admin BLDG) as Highlighted
Concreting of Column/Buttress for PC 185 Axis 02 AV
Shuttering of Column/Buttress for PC 185 Axis 02 AV
Application of Solvent Base Primer for TIP Under Strip Footing Zone 2A as highlighted
Surface Preparation Prior to Start Water proofing for TIP Under Strip Footing Zone 2A as highlighted
Shuttering and Concreting of Blinding for MCPE 3 @ zone 6 (3rd) as highlighted
Application of Anti Termite Prior Casting of Blinding for MCPE 3 @ zone 6 (3rd) as highlighted
Level, Coordinates of Foundation Concrete as Highlighted in North Admin Building Zone 2Q
Level & Location for Blinding Concrete in Main Crescent Plant Enclosure Zone 6 (2)
Level & Location for Excavation (rock Level) in Main Crescent Plant Enclosure Zone 6 (2)
Stone Cladding for Columns of Boundary wall @ Column No. C35, C36 & C37 (All Sides), As per Attach
"Mock up Inspection for Stone Boulder Grounting at Boulder No. RB-267 (Mock up-1, Mock up-2)"
"Inspection of Formwork for the Wall of Seating Area (3) at Zone-N (SA-5) As Highlighted"
Inspection for application of Protection Board on top of Damp Proofing for External wall and Top Slab of
"Inspection of Formwork for the Wall of Play area (2) at Zone-I As Highlighted"
"Inspection of Formwork for the Wall of Seating Area (3) at Zone-M (SA-11) As Highlighted"
"Inspection of Formwork for the Wall of Seating Area (3) at Zone-M (SA-10) As Highlighted"
"Inspection of Formwork for the Wall of Seating Area (3) at Zone-M (SA-9) As Highlighted"
Concrete Surface Preperation prior to start the Waterproofing at Seating Area (1) at Zone-G (SA-10) As
Inspection for application of Base Primer (50%x50% Bitumin & Water) on Foundation and wall at Saeting
Inspection for application of Bituminous Damp Proofing (2nd Coat) on top of Primer for Foundation and
Inspection of Concrete Pouring for the Wall of Seating Area (3) at Zone-J (SA-14) As Highlighted
Inspection for Casting the Blinding Concrete under foundation of Cesspool -5
"Inspection of Formwork for the Foundation of Seating Area (2) at Zone-J (SA-3) As Highlighted"
"Inspection of Formwork for the Foundation of Seating Area (2) at Zone-J (SA-26) As Highlighted"
"Inspection of Formwork for the Foundation of Seating Area (2) at Zone-J (SA-25) As Highlighted"
Surface Preparation Prior to Start Water proofing for Below Foundation (Inner elevation) of Retaining
Concreting of Column/Buttress for PC 184 Axis 02 AU
Concrete Pouring & Shuttering for Kicker (Inside) for boundary wall @ Span 7 at Water Garden, as pe
Coordinates & Top Level of Kicker (Inside) for boundary wall @ Span 7 at Water Garden, as per Atta
Stone Cladding for Boundary wall Inner Face @ Span 31, 32 & 33, As per Attached Highlighted Drawin
'Installation of warning tape (315 mmØ upvc pipes) foul water drinage lifting line )pt. 49 to pt 56 (FO
Installation of pipesfor Foul Water Drainage 160mm Øupvc class 4(FW-A-3-6.12 to FW-A-3-6.10); as pe
Inspection for Installation of Stone cladding for the Wing Wall of the Culverts at Western Wadi (as Highl
Inspection for Casting the Blinding Concrete under the Manhole of Storm Water at Zone-1 As Highlighte
Inspection of Steel Reinforcement for the Foundation and Wall of Seating Area (2) at Zone-J (SA-25) As
Inspection of Steel Reinforcement for the Foundation and Wall of Seating Area (2) at Zone-J (SA-3) As H
Inspection of Concrete Pouring for the Wall of Seating Area (3) at Zone-J (SA-17) As Highlighted
Inspection of Concrete Pouring for the Wall of Seating Area (3) at Zone-N (SA-7) As Highlighted
Inspection of Concrete Pouring for the Wall of Seating Area (3) at Zone-N (SA-3) As Highlighted
Inspection of Concrete Pouring for the Wall of Play Area(1) at Zone-N As Highlighted
Inspection of Concrete Pouring for the Wall of Seating Area (3) at Zone-N (SA-4) As Highlighted
Installation of UPVC conduit sleeves (Dia.32mm) for Power in CESSPOOL - 2 at the beside Site Tower -5
Steel Reinforcement Implant using approval material (KAIG3-MAT-GN-S-0099-00) for Retaining Wall K
Concreting for Internal building (Zone 1A & 1B) foundation as highlighted.
Steel Reinforment for Internal building (Zone 1A & 1B) foundation as highlighted.
Level, Coordinates of foundation concrete as highlighted in Internal buildings Zone 1A & 1B.
Shuttering for Internal building (Zone 1A & 1B) foundation as highligted.
Excavation for foul line for (FW6 to FW9) prior to Gravel bedding at highlighted area in the attached
Excavation for foul line for (FW1-3 to FW1-3.1) prior to Gravel bedding at highlighted area in the att
Installation of Pipes Sleeve UPVC class 4; as per highlighted in drawing.
Inspection for Casting the Blinding Concrete under the Footing of Seating Area (2) at Zone-N (SA-4) As H
Inspection for Casting the Blinding Concrete under the Footing of Seating Area (2) at Zone-M (SA-11) As
"Inspection of Formwork for the Wall of Seating Area (3) at Zone-J (SA-14) As Highlighted"
"Inspection of Steel Reinforcement for Wall of Cesspool-02 As Highlighted"
Inspection for application of Protection Layer 4mm Thick Bituminous Protection Board on top of Bitum
Concrete Surface Preperation prior to start the Waterproofing at Seating Area (3) at Zone-G (SA-19) As
Inspection for application of Bituminous Damp Proofing (1st Coat) on top of Primer for Foundation and
Inspection for application of Damp Proofing (2nd Coat) on top of Primer for External Wall and Top Slab
Level, Coordinates of 3 Columns for Colonnades (as Highlighted) Axis 02-AT (2nd)
Level, Coordinates for Blinding Concrete Below Foundation of Retaining wall Between Axis 02-AA to 01-Z
Shuttering and Concrete Pouring of Blinding for Retaining wall foundation Between Axis 01-AA to 01-Z (
Inspection of Block Work upto Final Height with Installation of Adjustable Angle and Filler Board at
Steel Reinforcement for Wall @ Grid 39 to 45, of Boundary wall at Aviary Garden, As per Highlighted
Concrete Pouring & Shuttering of Kicker for boundary wall @ Span 11 at Water Garden, as per Attac
Steel Reinforcement of Kicker for boundary wall @ Span 11 at Water Garden, as per Attached Drawin
Coordinates & Top Level of Kicker (Outside) for boundary wall @Span 11 at Water Garden, as per At
Inspection for application of Protection Board on top of Damp Proofing for External wall and Top Slab o
Inspection for application of Damp Proofing (1st Coat) on top of Primer for External Wall and Top Slab o
"Mock up Inspection for Stone Boulder Grounting at Boulder No. RB-267 (Mock up-121, Mock up-132,
Joint Surface Preperation prior to start grout for Boulder No.RB- 267
Joint Surface Preperation prior to start grout for Boulder No.RB- 071
Inspection for Casting the Blinding Concrete under Beam of Seating Area (1) at Zone-G (SA-11) As Highl
Inspection for Casting the Blinding Concrete under the Footing of Seating Area (2) at Zone-M (SA-12) As
Inspection for Casting the Blinding Concrete under the Footing of Seating Area (2) at Zone-M (SA-15) As
Inspection for application of Bituminous Damp Proofing (2nd Coat) on top of Primer for Foundation and
Inspection for application of Bituminous Damp Proofing (1st Coat) on top of Primer for Foundation and
Inspection for application of Base Primer (50%x50% Bitumin & Water) on Foundation and wall at Saeting
Inspection of Concrete Pouring for the Foundation of Play Area(2) at Zone-I As Highlighted
Inspection of Concrete Pouring for the Wall of Seating Area (2) at Zone-J (SA-20) As Highlighted
Inspection of Concrete Pouring for the Wall of Seating Area (2) at Zone-J (SA-21) As Highlighted
Inspection of Concrete Pouring for the Wall of Seating Area (2) at Zone-J (SA-24) As Highlighted
Inspection of Concrete Pouring for the Foundation of Seating Area (3) at Zone-J (SA-15) As Highlighted
Concreting of 3 Column/Buttress for Colonnades (zone 2P) as highlighted axis 02-AW as highlighted (2n
Shuttering and concreting for Plain Concrete of foundation at TIP Zone 2A
Application of Anti Termite under Plain Concrete of foundation at TIP Zone 2A
Level, Coordinates for Blinding Concrete Below Foundation in Zone 2A TIP (zone 7)
Level, Coordinates for Excavation (rock Level) in Zone 2A TIP (zone 7)
Concrete Pouring & Shuttering of Wall @ Span 5 & 6 for boundary wall at Water Garden, as per Atta
Steel Reinforcement of Wall @ Span 5 & 6 for boundary wall at Water Garden, as per Attached Drawi
Coordinates & Top Level of Wall @ Span 5 & 6 for boundary wall at Water Garden, as per Attached D
Geo Textile (Both sides 500mm wide) for Blinding under boundary wall @ span 11 at Water Garden at
Protection Layer 4mm thk. Bituminous Protection Board (Both sides 500mm wide) for Blinding under
Gravel 3/8 Bedding & Geotextile Surround for Sub-Surface Drain Pipes (110 Dia) Near Zone 5, 9 & 10,
Gravel 3/8 Bedding & Geotextile Surround for Sub-Surface Drain Pipes (110 Dia) Part 3 in Centre, at B
Installation of FOUL WATER LINE pipes (250mmØ) upvc class 5 (FW9 to FW10) as per high lighted in
Inspection for Casting the Blinding Concrete under foundation of Cesspool - 4
Installation of Rock and Boulder No. RB-288 (4th Layer)
"Inspection of Formwork for the Wall of Seating Area (3) at Zone-N(SA-13) As Highlighted "
"Inspection of Formwork for the Wall of Seating Area (3) at Zone-N(SA-7) As Highlighted "
"Inspection of Formwork for the Wall of Seating Area (3) at Zone-N(SA-4) As Highlighted "
"Inspection of Formwork for the Wall of Seating Area (3) at Zone-J(SA-3) As Highlighted "
"Inspection of Formwork for the Wall of Seating Area (3) at Zone-J(SA-17) As Highlighted "
"Inspection of Formwork for the Wall of Play area (1) at Zone-N As Highlighted"
Inspection of Concrete Surface Preperation for external side of SBC-02 (Part-A) prior to start waterproof
Inspection for application of Primer (1 Coat) on External Wall and Top Slab of SBC-02 (Part-A) - As Highl
Concrete Pouring & Shuttering for Footing of boundary wall Span 11 at Water Garden, as per Attach
Surface preparation prior to Stone Clanding for boundary wall (Inner Face) @ span 14, 15, 16 & 17 at
Single Layer Water proofing membrane 4mm thk. (Both sides 500mm wide) for Blinding under boundar
2nd Coat Cementitious Water Proofing for Blinding under boundary wall @ span 11 at Water Garden a
1st Coat Cementitious Water Proofing for Blinding under boundary wall @ span 11 at Water Garden at
Solvent Base Primer Coating (Both sides 500mm wide) for Blinding prior to Water proofing under bou
Surface preparation of Blinding prior to Water proofing under boundary wall @ span 11 at Water Gard
Installation of HVAC DUCT WORKS; as per high lighted in dwg.
Bedding for Gravel 3/8" & Geotextile sorround for Foul Water Line ( FW-9 to FW-11) 250mmØ pipe as
Bedding for Gravel 3/8" & Geotextile sorround for Foul Water Line related to North Watch Tower (
Bedding for Gravel 3/8" & Geotextile sorround for Storm Water Line -out fall-B (G-B-7 to MH-B-02) 3
Installation of FORCE LINE pipes (315mmØ) upvc class 5 (PT. 49 to PT. 56) as per high lighted in dwg.
Coordinates & Top Level of Footing of boundary wall Span 7 at Water Garden, as per Attached Drawi
Coordinates & Top Level of Kicker (Outside) for boundary wall @ Span 5 & 6 at Water Garden, as per
Coordinates & Top Level of Kicker (Outside) for boundary wall @ Span 7 at Water Garden, as per Att
Coordinates & Top Level of Kicker (Inside) for boundary wall @ Span 5 & 6 at Water Garden, as per
Stone Cladding for Boundary wall @ Span 18, 19, 20 & 21 (Outer Face) at Water Garden, as per Atta
Soil Preparation prior to start Backfill for Outside of boundary wall Span 14, 15, 16 & 17 at Water Ga
Concrete Pouring for Blinding of boundary wall Span 11 at Water Garden, as per Attached Drawings.
Steel Reinforcement for Footing of boundary wall Span 11 at Water Garden, as per Attached Drawing
Coordinates & Top Level of Footing of boundary wall Span 11 at Water Garden, as per Attached Draw
Concrete Pouring & Shuttering for Kicker (Outside) of boundary wall Span 8, 9 & 10 at Water Garden,
Steel Reinforcement for Kicker of boundary wall Span 8, 9 & 10 at Water Garden, as per Attached Dr
Coordinates & Top Level of Kicker (Outside) of boundary wall Span 8, 9 & 10 at Water Garden, as per
Aluminium Flashing & Sealant for boundary Wall (Inner Face) @ Grid (EXC4-11/12 to 27/28 & EXC4-29/
Stone Cladding for Boundary wall Outer Face @ Grid (EXC4-11/12 to 27/28) at Physic Garden at highli
Stone Cladding for Columns for Boundary wall @ Column No. C56, C57, C58 & C58A (All Sides), As per
Single Layer Membrane Water proofing for boundary wall Outer face @ span 1, 3 & 4 at Water Garden
Primer Coat prior to apply Single Layer Membrane Water proofing for boundary wall Outer face @ spa
Surface Preparation Prior to Stone Cladding for Boundary wall (Inner Face) @ Span 2, 3, 4, 5, 6, 7, 8, 9
Stone Cladding for Boundary wall Inner Face @ Span 37 & 38, As per Attached Highlighted Drawing's.
Surface preparation prior to Water proofing for Boundary wall Inner Face @ Span 61B, 62, 63, 64, 65
Level, Location for Retaining wall - top of kicker between Axis AD to AF Zone 1
Shuttering of 3 Column/Buttress for Colonnades (zone 2P) as highlighted axis 02-AW as highlighted (2nd
Inspection for Casting the Blinding Concrete under the Footing of Seating Area (2) at Zone-J(SA- 1) As Hi
"Inspection of Concrete Pouring for the Wall of Seating Area (3) at Zone-J (SA-2) As Highlighted"
"Inspection of Formwork for the Wall of Seating Area (2) at Zone-J (SA-24) As Highlighted"
"Inspection of Concrete Pouring for the Wall of Seating Area (3) at Zone-J (SA-1) As Highlighted"
"Inspection of Concrete Pouring for the Wall of Seating Area (3) at Zone-N (SA-6) As Highlighted"
Inspection of Concrete Pouring for the Foundation of Seating Area (3) at Zone-M (SA-9) As Highlighted
Inspection of Concrete Pouring for the Foundation of Seating Area (3) at Zone-J (SA-14) As Highlighted
Excavation for foul line for ( FW9 to to FW9-1) prior to gravel bedding. At highlighted area in the att
Concrete Pouring & Shuttering of Footing of boundary wall Span 8, 9 & 10 at Water Garden, as per A
Excavation & Bed Preparation for Sub-Surface Drain Pipes (110 Dia) Part 3, at Butterfly Garden, At hi
Excavation & Bed Preparation for Sub-Surface Drain Pipes (110 Dia) Near Zone 5, 9 & 10, at Discovery
Concreting as per KAIG3-SCR-CO-S-0050-01 Retaining wall at Crescent Between Axis 01-AT to 01-AR (Ou
Concreting for Internal Building (Zone 1A & 1B) Foundation as Highlighted
"Inspection of Formwork for the Foundation of Play Area (2) at Zone-J As Highlighted"
Inspection of Steel Reinforcement for the Foundation and Wall of Play Area (02) at Zone-J As Highlighte
Shuttering for Internal Building (Zone 1A & 1B) Foundation as Highlighted
Steel Reinfocement for Internal Building (Zone 1A & 1B) Foundation as Highlighted
Installation of Rock and Boulder No. RB-245 (1st & 2nd Layer)
Concrete Pourng for Retaining Wall (WALL) (as Highlighted at AXIS AF TO AH)
Surface Preperation prior to start backfilling for Prayer Area at Zone-G (Internal Area) - As Highlighted
"Inspection of Formwork for the Wall of Seating Area (2) at Zone-J (SA-21) As Highlighted"
"Inspection of Formwork for the Wall of Seating Area (2) at Zone-J (SA-20) As Highlighted"
Inspection for Casting the Blinding Concrete under the Footing of Seating Area (2) at Zone-J (SA- 1) As H
Concreting for Retaining wall Kicker At Axis AD to AF (as Highlighted)
Inspection for Casting the Blinding Concrete under the Footing of Seating Area (2) at Zone-J (SA- 3) As H
Inspection for Casting the Blinding Concrete under the Footing of Seating Area (2) at Zone-J (SA- 19) As
Inspection for Casting the Blinding Concrete under the Footing of Seating Area (2) at Zone-J (SA- 26) As
Inspection for Casting the Blinding Concrete under the Footing of Seating Area (2) at Zone-J (SA- 25) As
Shuttering for Retaining wall Kicker At Axis AD to AF (as Highlighted)
Steel Reinforcement for Retaining wall Kicker At Axis AD to AF (as Highlighted)
Level, Coordinates of Foundation Concrete as Highlighted in Internal Buildings Zone 1A & 1B
Level, Location for Retaining wall - Bottom & top of wall between Axis AH to AF Zone 1 inner
Installation of chilled water pipes (Black Steel sch. 40) 65 & 80mmØ) as per high lighted in dwg.
Level, Coordinates of Column Buttress for PC 186 Axis 02-AV
"Inspection of Formwork for the Foundation of Seating Area (3) at Zone-J (SA-14) As Highlighted"
Installation of sub surface main line drainage upvc pipes class 4 (160 & 200mmØ) as per high lighted
Surface preparation prior to Stone Cladding for boundary wall (Outer Face) @ span 22, 23, 24 & 25 @
Steel Reinforcement for Footing of boundary wall Span 8, 9 & 10 at Water Garden, as per Attached D
Coordinates & Top Level of Footing of boundary wall Span 8, 9 & 10 at Water Garden, as per Attache
"Inspection of Formwork for the Wall of Seating Area (3) at Zone-N (SA-6) As Highlighted"
Installation of Rock and Boulder No. RB-151 (Full Boulder - 6 Layers)
Installation of Rock and Boulder No. RB-288 (3rd Layer)
"Inspection of Formwork for the Wall of Seating Area (3) at Zone-N (SA-5) As Highlighted"
"Inspection of Formwork for the Foundation of Seating Area (3) at Zone-J (SA-15) As Highlighted"
Inspection of Steel Reinforcement for the Foundation and Wall of Seating Area (3) at Zone-J (SA-15) As
Inspection for Casting the Blinding Concrete under foundation of Cesspool -4
Inspection of Steel Reinforcement for the Foundation and Wall of Seating Area (3) at Zone-J (SA-14) As
Steel Reinforcement of Column for Colonnades Cantilever (zone 2P) as highlighted 3 Columns axis 02 AT
Concreting of Column/Buttress for PC 183 Axis 02 AU
Shuttering of Column/Buttress for PC 183 Axis 02 AV
Concreting of Column/Buttress for PC 186 Axis 02 AV
Excavation for foul line for ( FW1-2 to to FW1-3) prior to gravel bedding. At highlighted area in the a
Notification to start excavation for foul line for ( FW network up to STP west area). At highlighted ar
"Inspection of Formwork for the Foundation of Seating Area (3) at Zone-M (SA-9) As Highlighted"
Inspection of Steel Reinforcement for the Foundation and Wall of Seating Area (3) at Zone-M (SA-9) As
Inspection of Concrete Pouring for the Foundation of Play Area (01) at Zone-N As Highlighted
"Inspection of Formwork for the Foundation of Play Area (01) at Zone-N As Highlighted"
"Mock up inspection of Wall Stone Cladding for Seating Area (1) at Zone-G (SA-11) - As Highlighted ( No
Gravel 3/8 Bedding & Geotextile Surround for Sub Surface Main Line 250mm, 200mm & 160mm Part 2)
Existing Level for Starting Backfill and Cut in Zone 2Q North Admin BLDG.
Shuttering of Column/Buttress for PC 186 Axis 02 AV
Surface Preparation prior to start Backfilling for Zone 2R (as Highlighted)
Notification start Backfilling for Zone 2R (as Highlighted)
1st Coat Cementitious Water Proofing for Blinding under boundary wall @ Grid (21 to 23/Left Side) at
Surface preparation of Blinding prior to Water proofing under boundary wall @ Grid (21 to 23/Left Sid
Notification to start excavation for foul line for ( FW9 TO FW11). At highlighted area in the attached
Excavation for foul drainage line for ( FW-9 TO FW-10) prior to gravel bedding. At highlighted area in
'Excavation for foul line for ( FW-10TO FW-11) prior to gravel bedding. At highlighted area in the att
Crazy cut Stone cladding Installed for Boundary wall @ "Elevation "A" to "B" (Inner face) @ Maze Gar
Stone Cladding for Boundary wall Outer Face @ Grid (EXC4-29/30 to 41/42) at Physic Garden at highli
Concrete Pouring & Shuttering for Kicker (Outside) for boundary wall @ Span 7 at Water Garden, as
Coordinates & Top Level of Kicker (Outside) for boundary wall @ Span 7 at Water Garden, as per Att
Concrete Pouring & Shuttering for Kicker (Inside) for boundary wall @ Span 5 & 6 at Water Garden, a
Coordinates & Top Level of Kicker (Inside) for boundary wall @ Span 5 & 6 at Water Garden, as per
Soil Preparation under Boulder No.RB- 286
"Inspection of Formwork for the Wall of Seating Area (3) at Zone-J (SA-2) As Highlighted"
"Inspection of Formwork for the Wall of Seating Area (3) at Zone-N (SA-12) As Highlighted"
Inspection of Steel Reinforcement for the Foundation and Wall of Play Area (01) at Zone-G As Highlight
Surface Preperation prior to start backfilling Sub-Base under Slap and Beam of Seating Area (1) Zone-G
"Inspection of Formwork for the Wall of Seating Area (3) at Zone-J (SA-1) As Highlighted"
Surface Preperation prior to start backfilling for Prayer Area at Zone-G (Internal & External Area) - As Hi
Application of Aluminum Flashing (2.0 mm THICK and 50mm GIRTH) and Sealant for Foundation (inner a
Level & Location for Blinding Concrete in Main Crescent Plant Enclosure Zone 6 (2nd)
Excavation for foul drainage line for ( FW-A-3-6.12 TO FW-A-6.10) As per highlighted area in the atta
Installation of UPVC straight conduit (Dia. 32mm 2Pcs. each Power Socket ) for Power at the Physics
Installation of UPVC straight conduit (Dia.25mm Door Release-1Pc.each,CAM-1pcs each,Magnetic Door
Installation of UPVC straight conduit (Dia.25mm 1Pc.each - Fire Telecom Call Point,Fire Alarm Flashing
Installation of UPVC straight conduit (Dia.25mm 1pc. Each -DATA,TEL.&CAM) and Box (1pc. Each - DAT
Installation of Rock and Boulder No. RB-288 (2nd Layer)
Installation of Rock and Boulder No. RB-312( Full Boulder 5th & 6th Layer)
Installation of Rock and Boulder No. RB-241 (1st Layer)
"Inspection of Formwork for the Wall of Seating Area (1) at Zone-M (SA-4) As Highlighted"
"Inspection of Concrete Pouring for the Wall of Seating Area (1) at Zone-M (SA-4) As Highlighted"
"Inspection of Concrete Pouring for the Wall of Seating Area (1) at Zone-N (SA-2) As Highlighted"
Inspection of Concrete Pouring for the Foundation of Seating Area (3) at Zone-N (SA-4) As Highlighted
Inspection for application of Base Primer (50%x50% Bitumin & Water) on Foundation and wall at Saeting
Inspection for application of Damp Proofing (2nd Coat) on top of Primer for External Wall and Top Slab o
Concrete Surface Preperation prior to start the Waterproofing at Seating Area (1) at Zone-G (SA-12) As
Level, Coordinates for Top of Blinding for Retaining wall Axis 01S to 01P
Level, Coordinates for Rock Level, Excavation Level, and Top of Blinding for Retaining wall Axis 01S to 0
Level, Coordinates of Blinding Concrete as Highlighted in Internal Buildings Zone 1A & 1B
Level, Coordinates for Excavation (rock Level) as Highlighted in Zone 1A & 1B
Shuttering works for Blinding of Retaining wall Foundation SHearkey at Axis 01-S to 01-P
Concreting of Blinding for MCPE 3 @ zone 6 (2nd)
Application of Anti Termite Prior Casting of Blinding for MCPE 3 @ zone 6 (2nd)
Application of Anti Termite for Internal Building (Zone 1A & 1B) as Highlighted
Installation of FORCE LINE pipes (315mmØ) upvc class 5 (PT. 49 to PT. 56) as per high lighted in dwg.
Shuttering and Cconcreting of Blinding for Internal Building (Zone 1A & 1B) as Highlighted
Geo Textile (Both sides 500mm wide) for Blinding under boundary wall @ span 22, 23, 24 & 25 @ Wat
Protection Layer 4mm thk. Bituminous Protection Board (Both sides 500mm wide) for Blinding under
Single Layer Water proofing membrane 4mm thk. (Both sides 500mm wide) for Blinding under boundar
Geo Textile (Both sides 500mm wide) for Blinding under boundary wall @ span 8, 9 & 10 @ Water Gar
Protection Layer 4mm thk. Bituminous Protection Board (Both sides 500mm wide) for Blinding under
Single Layer Water proofing membrane 4mm thk. (Both sides 500mm wide) for Blinding under boundar
2nd Coat Cementitious Water Proofing for Blinding under boundary wall @ span 8, 9 & 10 @ Water Ga
Single Layer Water proofing membrane for Wall & Wall foundations (Surround) @ Jetty # 2 at Boat Ga
Single Layer Water proofing membrane for Wall & Wall foundations (Surround) @ Jetty # 1 at Boat Ga
Solvent Base Primer Coating (Both sides 500mm wide) for Blinding prior to Water proofing under bou
2nd Coat Cementitious Water Proofing for Blinding under boundary wall @ span 22, 23, 24 & 25 @ Wa
1st Coat Cementitious Water Proofing for Blinding under boundary wall @ span 22, 23, 24 & 25 @ Wat
Surface preparation of Blinding prior to Water proofing under boundary wall @ span 22, 23, 24 & 25
1st Coat Cementitious Water Proofing for Blinding under boundary wall @ span 8, 9 & 10 @ Water Gar
Solvent Base Primer Coating (Both sides 500mm wide) for Blinding prior to Water proofing under bou
Surface preparation of Blinding prior to Water proofing under boundary wall @ span 8, 9 & 10 @ Wat
Coordinates, Alignment & Levels of Wall upto 3.8m Height of Boundary wall (Grid 12-18/Left Side) at
Concrete Pouring & Shuttering for Wall upto 3.8m Height of Boundary wall (Grid 12-18/Left Side) at A
Coordinates & Top Level of Footing of boundary wall Span 7 at Water Garden, as per Attached Drawi
Concrete Pouring & Shuttering for Footing of boundary wall Span 7 at Water Garden, as per Attached
Steel Reinforcement for Footing & Kicker @ span 7 of boundary wall at Water Garden, as per Attach
Concrete Pouring & Shuttering for Kicker (Outside) for boundary wall @ Span 5 & 6 at Water Garden,
Coordinates & Top Level of Kicker (Outside) for boundary wall @ Span 5 & 6 at Water Garden, as per
Concrete Pouring for Blinding of boundary wall Span 8, 9 & 10 at Water Garden, as per Attached Dra
Level, Coordinates for Excavation (rock Level) as Highlighted in North Admin Building Zone 2Q
Level, Coordinates of Blinding Concrete as Highlighted in North Admin Building Zone 2Q
Application of Anti Termite for Internal Building (Zone 2Q North Admin BLDG) as Highlighted
Shuttering and Cconcreting of Blinding for Internal Building (Zone 2Q North Admin BLDG) as Highlighted
Steel Reinforcement for Retaining Wall (WALL) (as Highlighted at AXIS AF TO AH)
Shuttering for Retaining Wall (WALL) (as Highlighted at AXIS AH TO AF)
"Inspection of Formwork for the Foundation of Seating Area (1) at Zone-N (SA-2) As Highlighted"
Installation of soil, waste & vent and rain water pipes; CI pipes (50, 75, & 100mmØ) as per high lighte
"Inspection of Formwork for the Foundation of Seating Area (3) at Zone-N (SA-4) As Highlighted"
Inspection of Steel Reinforcement for the Foundation and Wall of Seating Area (3) at Zone-N (SA-4) As H
Inspection of Concrete Pouring for the Foundation of Seating Area (3) at Zone-M (SA-11) As Highlighted
Inspection of Concrete Pouring for the Foundation of Seating Area (3) at Zone-M (SA-10) As Highlighted
Inspection of Concrete Pouring for the Foundation of Seating Area (3) at Zone-I (SA-18) As Highlighted
Inspection of Concrete Pouring for the Foundation of Seating Area (3) at Zone-N (SA-3) As Highlighted
Shuttering and Concreting of Blinding for Retaining wall Foundation Between Axis AA to AB (as Highli
Excavation & Bed preparation for Sub Surface Main Line 250mm, 200mm & 160mm Part 2) at Physic Ga
Inspection for application of Damp Proofing (1rt Coat) on top of Primer for External Wall and Top Slab o
"Inspection of Formwork for the Foundation of Seating Area (3) at Zone-M (SA-11) As Highlighted"
Inspection of Steel Reinforcement for the Foundation and Wall of Seating Area (3) at Zone-M (SA-11) As
"Inspection of Formwork for the Foundation of Seating Area (3) at Zone-M (SA-10) As Highlighted"
Inspection of Steel Reinforcement for the Foundation and Wall of Seating Area (3) at Zone-M (SA-10) As
"Inspection of Formwork for the Foundation of Seating Area (3) at Zone-N (SA-3) As Highlighted"
Inspection of Steel Reinforcement for the Foundation and Wall of Seating Area (3) at Zone-N (SA-3) As H
Inspection of Concrete Pouring for the Foundation of Seating Area (3) at Zone-N (SA-7) As Highlighted
"Inspection of Concrete Pouring for the Wall of Seating Area (1) at Zone-N (SA-1) As Highlighted"
"Inspection of Formwork for the Wall of Seating Area (1) at Zone-N (SA-6) As Highlighted"
"Inspection of Formwork for the Wall of Seating Area (1) at Zone-N (SA-5) As Highlighted"
Shuttering works and Concreting of Blinding of Retaining wall Foundation at Axis 01AB - 01Z
Shuttering works and Concreting of Blinding of Retaining wall Foundation SHearkey at Axis 01AB - 01Z
Concrete Repairing of (3) Colonnades Column (as Highlighted) Using Approved Repair Materials (Rend
Level, Coordinates of Foundations Highlighted in South Admin Building
Installation of UPVC straight conduit (Dia. 25mm-CAM&WIFI) and Box (CAM) for Security at the Physic
Installation of UPVC straight conduit (Dia.25mm) and Box (Speaker) for Fire Alarm at the Physic Garden
Installation of UPVC straight conduit (Dia.25mm-CAM&WIFI) and Box (CAM&Wifi) for Voice and Data at
Installation of UPVC straight conduit (Dia. 32mm 3Pcs. Each CAM & WIFI, 2Pcs. Each E-Ticket Power So
Concreting of 9 Internal Foundation in Zone 2C (south admin BLDG.) as highlighted (2nd)
Shuttering Formworks of 9 Internal Foundation in Zone 2C (south admin BLDG.) as highlighted (2nd)
Steel Reinforcement of 9 Internal Foundation in Zone 2C (south admin BLDG.) as highlighted (2nd)
Shuttering of 3 Column/Buttress for Colonnades (zone 2P) as highlighted axis 02-AW as highlighted
Concreting of 3 Column/Buttress for Colonnades (zone 2P) as highlighted axis 02 AW
Concreting for Retaining wall Kicker At Axis AF to AH (as Highlighted)
Steel Reinforcement for Retaining wall Kicker At Axis AF to AH (as Highlighted)
Shuttering for Retaining wall Kicker At Axis AF to AH (as Highlighted)
Surface preparation Prior to Stone Cladding for Boundary wall Outer Face @ span 1 at Water Garden a
Surface Preperation prior to start backfilling behind the boundary wall at Zone-C (As Highlighted)
Installation of Rock and Boulder No. RB-267 (2nd Layer)
Installation of Rock and Boulder No. RB-301 (Full Boulder - 5 Layers)
Surface preparation Prior to Water proofing for boundary wall Outer face @ span 1 at Water Garden a
"Inspection of Formwork for the Foundation of Seating Area (3) at Zone-I (SA-18) As Highlighted"
Coordinates & Top Level of Blinding of boundary wall @ span 10 & 11 @ Water Garden at highlighted
Inspection of Steel Reinforcement for the Foundation and Wall of Seating Area (3) at Zone-I (SA-18) As
Excavation & Surface Preparation for foundation of boundary wall @ span 10 & 11 @ Water Garden at
Coordinates & Top Level of Footing of boundary wall Span 5 & 6 at Water Garden, as per Attached D
"Inspection of Formwork for the Foundation of Seating Area (3) at Zone-N (SA-7) As Highlighted"
Concrete Pouring & Shuttering for Footing of boundary wall Span 5 & 6 at Water Garden, as per Atta
Concreting for Slab of Tunnel 1 (Near MCPE) as highlighted
Steel Reinforcement for Footing & Kicker @ span 5 & 6 of boundary wall at Water Garden, as per At
Inspection of Steel Reinforcement for the Foundation and Wall of Seating Area (3) at Zone-N (SA-7) As H
Shuttering for Slab of Tunnel 1 (near MCPE) as highlighted
Stone Cladding for Boundary wall Inner Face @ span 39, 40 & 41 at highlighted area in attached Draw
Inspection of Concrete Pouring for the Foundation of Seating Area (3) at Zone-N (SA-6) As Highlighted
Stone Cladding for Boundary wall Inner Face @ span 34, 35 & 36 at highlighted area in attached Draw
Inspection of Concrete Pouring for the Foundation of Seating Area (3) at Zone-N (SA-5) As Highlighted
Steel reinforcement for Slab of Tunnel 1 (Near MCPE) as highlighted
Steel Reinforcement for Wall upto 4m Height of Boundary wall (Grid 18-10/Left Side) at Aviary Garden
"Inspection of Concrete Pouring for the Wall of Seating Area (2) at Zone-L (SA-37) As Highlighted"
Level, Coordinates of 3 Columns for Colonnades (as Highlighted) Axis 02-AW
"Inspection of Concrete Pouring for the Wall of Seating Area (1) at Zone-N (SA-6) As Highlighted"
"Inspection of Concrete Pouring for the Wall of Seating Area (1) at Zone-N (SA-5) As Highlighted"
"Inspection of Formwork for the Wall of Seating Area (1) at Zone-N (SA-1) As Highlighted"
Level, Location for Retaining wall - top of kicker between Axis AH to AF Zone 1
Level, Location of Plain Concrete below foundation in Administation Building Axis G toH Zone 7 (as Highl
Level, Coordinates, slab of Tunnel 1 (Near MCPE) as highlighted
Installation of UPVC conduit (Dia. 25mm ) and Box (CAM) for Security (CCTV System) at the Maintenanc
Installation of UPVC conduit (Dia. 25mm 1Pc. Each devises) and Box 1pc.each devises (CAM,DATA& TEL)
Installation of UPVC conduit (Dia. 25mm 1Pc. Each devises) and Box 1pc.each devises (Break Glass,Fl
'Installation of warning tape (315 mmØ upvc pipes) foul water drinage lifting line )pt. 49 to pt 56 (FO
'Sand backfilling 300mm above the pipe (315 mmØ upvc pipes) foul water drinage lifting line )pt. 49
Installation of thrust block for the pipe (315 mmØ upvc pipes) foul water drinage lifting line )pt. 49 t
Installation of sub surface main line drainage upvc pipes class 4 (160 & 110mmØ) as per high lighted
Coordinates & Top Level of Blinding of boundary wall @ span 8 & 9 at Water Garden at highlighted ar
Concrete Pouring & Shuttering for Lintels of Doors & Walls and Stiffner Column's at Grid between 10-
Steel Reinforcement for Lintels of Doors & Walls and Stiffner Column's at Grid between 10-12/R-S, as
Concrete Pouring & Shuttering for Stiffner Column's at Grid Between 3-4/S-V, 6/Q, 7/Q, 8-10/N-Q, 8
Solvent Base Primer Coating for boundary wall Outer face @ span 22, 23, 24 & 25 @ Water Garden at
Stone Cladding for Boundary wall Outer Face @ Grid (EXC4-11/12 to 27/28) at Physic Garden at highl
Surface preparation Prior to Water proofing for boundary wall Outer face @ span 22, 23, 24 & 25 @
Concreting as per KAIG3-SCR-CO-S-0050-01 Retaining wall at Crescent Between Axis 01-AT to 01-AP
"Inspection of Formwork for the Wall of Seating Area (3) at Zone-J (SA-2) As Highlighted"
Inspection of Concrete Pouring for the Foundation of Seating Area (1) at Zone-M (SA-4) As Highlighted
Inspection of Concrete Pouring for the Foundation of Seating Area (3) at Zone-N (SA-13) As Highlighted
Inspection of Concrete Pouring for the Foundation of Seating Area (3) at Zone-N (SA-12) As Highlighted
Inspection of Concrete Pouring for the Foundation of Seating Area (3) at Zone-J (SA-2) As Highlighted
Inspection of Concrete Pouring for the Foundation of Seating Area (1) at Zone-N (SA-2) As Highlighted
"Inspection of Formwork for the Foundation of Seating Area (3) at Zone-N (SA-6) As Highlighted"
"Inspection of Formwork for the Foundation of Seating Area (3) at Zone-N (SA-5) As Highlighted"
Inspection for application of Primer (1 Coat) on External Wall and Top Slab of SBC-02 (Part-4) - As Highl
Inspection of Steel Reinforcement for the Foundation and Wall of Seating Area (3) at Zone-N (SA-6) As H
Inspection of Steel Reinforcement for the Foundation and Wall of Seating Area (3) at Zone-N (SA-5) As H
"Inspection of Formwork for the Foundation of Seating Area (1) at Zone-N (SA-2) As Highlighted"
Inspection of Steel Reinforcement for the Foundation and Wall of Seating Area (1) at Zone-N (SA-2) As H
Inspection for application of Bituminous Damp Proofing (2nd Coat) on top of Primer for Foundation and
Notification to start excavation for foul drainage line for North Watch( FWA-3-6.12 TO FWA-3-6.10). A
Level, Coordinates, Top of Wall of Retaining wall Axis AJ to AH Zone 1 Inner.
Inspection of Backfilling behind the Boundary Wall at Zone-E - As Highlighted
Gravel 3/8 Bedding & Geotextile Surround for Sub Surface Main Line (200mm & 160mm Part 1 & 110mm
Inspection of Crazy cut Stone cladding Installed for Boundary wall (Inner face) at "Elevation "D to A"
Surface preparation Prior to Stone Cladding for Boundary wall Outer Face @ span 3 & 4 at Water Gard
Surface preparation Prior to Water proofing for boundary wall Outer face @ span 3 & 4 @ Water Gard
Inspection for application of Damp Proofing (2nd Coat) on top of Primer for External Wall and Top Slab o
Inspection for Casting the Blinding Concrete under the Footing of Play Area (02) at Zone-J As Highlighte
Inspection for Casting the Blinding Concrete under the Footing of Play Area (01) at Zone-N As Highlight
"Inspection of Concrete Pouring for the Wall of Seating Area (2) at Zone-J (SA-23) As Highlighted"
"Inspection of Concrete Pouring for the Wall of Seating Area (2) at Zone-J (SA-22) As Highlighted"
Concrete Surface Preperation prior to start the Waterproofing at Seating Area (1) at Zone-G (SA-13) As
Inspection of Concrete Pouring for the Foundation of Seating Area (3) at Zone-J (SA-2) As Highlighted
Inspection of Steel Reinforcement for the Foundation and Wall of Seating Area (3) at Zone-J (SA-2) As H
Inspection of Concrete Pouring for the Foundation of Seating Area (1) at Zone-M(SA-4) As Highlighted
"Inspection of Formwork for the Wall of Seating Area (2) at Zone-J (SA-23) As Highlighted"
"Inspection of Formwork for the Wall of Seating Area (2) at Zone-J (SA-22) As Highlighted"
Installation of storm water line out fall B upvc pipes class 4 (450mmØ) (MH-B-02 to MH-B-01); as per
Level & Location for Blinding Concrete in Main Crescent Plant Enclosure Zone 6
Level & Location for Blinding Concrete in Zone 1A & 1B Internal Building Foundation zone 6
Level & Location for Excavation (rock level) in Zone 1A & 1B Internal Building Foundation zone 6
Excavation & Bed Preparation for STORM WATER LINE outfall B Pipes (315mm @G-B-9 UP MH-B-02). At
Installation of Rock and Boulder No. RB-312 (2nd Layer)
Excavation and Surface Preperation prior to start backfilling Sub-Base under Footing of Play Area - 02 -
Excavation and Surface Preperation prior to start backfilling Sub-Base under Footing of Play Area - 01 -
Inspection of Concrete Pouring for the Foundation of Seating Area (3) at Zone-J (SA-1) As Highlighted
Inspection of Concrete Pouring for the Foundation of Seating Area (3) at Zone-M (SA-8) As Highlighted
"Inspection of Formwork for the Foundation of Seating Area (1) at Zone-M (SA-4) As Highlighted"
"Inspection of Formwork for the Foundation of Seating Area (3) at Zone-M (SA-8) As Highlighted"
"Inspection of Formwork for the Foundation of Seating Area (3) at Zone-J (SA-1) As Highlighted"
Inspection of Steel Reinforcement for the Foundation and Wall of Seating Area (3) at Zone-M (SA-8) As
Inspection of Steel Reinforcement for the Foundation and Wall of Seating Area (1) at Zone-M (SA-4) As
Inspection of Steel Reinforcement for the Foundation and Wall of Seating Area (3) at Zone-N (SA-1) As H
Inspection for Casting the Blinding Concrete under the Footing of Seating Area (3) at Zone-N(SA- 3) As H
Inspection for Casting the Blinding Concrete under the Footing of Seating Area (3) at Zone-J (SA- 14) As
"Inspection of Formwork for the Foundation of Seating Area (3) at Zone-N (SA-13) As Highlighted"
"Inspection of Formwork for the Foundation of Seating Area (3) at Zone-N (SA-12) As Highlighted"
Inspection of Steel Reinforcement for the Foundation and Wall of Seating Area (3) at Zone-N (SA-13) As
Inspection for Casting the Blinding Concrete under the Footing of Seating Area (3) at Zone-N(SA- 7) As H
Inspection for Casting the Blinding Concrete under the Footing of Seating Area (1) at Zone-N(SA- 2) As H
Inspection for Casting the Blinding Concrete under the Footing of Seating Area (3) at Zone-N(SA- 7) As H
Inspection for Casting the Blinding Concrete under the Footing of Seating Area (3) at Zone-N(SA- 6) As H
Inspection for Casting the Blinding Concrete under the Footing of Seating Area (3) at Zone-N(SA- 5) As H
"Inspection of Formwork for the Foundation of Seating Area (1) at Zone-N (SA-6) As Highlighted"
Concreting of Blinding for MCPE 3 @ zone 6
Application of Anti Termite Prior Casting of Blinding for MCPE 3 @ zone 6
Application of Protection Layer of 4mm thk Bituminous Protection Board Below Foundation PC 117 to 1
Application of Protection Layer of geotextile sheet 180 gr. Per sqm and screed Below Foundation PC 117
Application of Single Layer of 4mm thk modified bituminous waterproofing membrane Below Foundation
Surface preparation Prior to Stone Cladding for Boundary wall Outer & Inner Face @ Grid (EXC4-11/12
Application of Solvent Base Primer Below Foundation PC 117 to 124 (zone 2E) as highlighted
Surface preparation Prior to Stone Cladding for Boundary wall Outer Face @ span 18, 19, 20 & 21 @
Excavation & Surface Preparation for foundation of boundary wall @ span 8 & 9 @ Water Garden at h
Surface Preparation Prior to Start Water proofing for Below Foundation PC 117 to 124 (zone 2E) as high
Existing levels at Base Prior to Excavation for Foundation of Boundary Wall at Span 8, 9, 10 & 11 @ W
Geo Textile (Both sides 500mm wide) for Blinding under boundary wall @ span 5, 6 & 7 @ Water Garde
Application of Protection Layer of 4mm thk Bituminous Protection Board Below Foundation PC 109 to 1
Protection Layer 4mm thk. Bituminous Protection Board (Both sides 500mm wide) for Blinding under
Single Layer Water proofing membrane 4mm thk. (Both sides 500mm wide) for Blinding under boundar
2nd Coat Cementitious Water Proofing for Blinding under boundary wall @ span 5, 6 & 7 @ Water Gar
Application of Protection Layer of geotextile sheet 180 gr. Per sqm and screed Below Foundation PC 109
1st Coat Cementitious Water Proofing for Blinding under boundary wall @ span 5, 6 & 7 @ Water Gard
Application of Single Layer of 4mm thk modified bituminous waterproofing membrane Below Foundation
Application of Solvent Base Primer Below Foundation PC 109 to 116 (zone 2D) as highlighted
Surface Preparation Prior to Start Water proofing for Below Foundation PC 109 to 116 (zone 2D) as high
Solvent Base Primer Coating (Both sides 500mm wide) for Blinding prior to Water proofing under bou
Surface preparation of Blinding prior to Water proofing under boundary wall @ span 5, 6 & 7 @ Wate
Inspection of Steel Reinforcement for the Foundation and Wall of Seating Area (3) at Zone-N (SA-12) As
Gravel 3/8 Bedding & Geotextile Surround for STORM DRAIN Drain Pipes (450 mm) at highlighted area
Inspection to check Anti Termite prior to casting blinding concrete for Deviding wall at Axis T.
Blinding concrete under pad footing at VIP Auditorium at grid A/8. A/7 & A/5.
Inspection for Anti termite prior to casting blinding concrete under pad footing at VIP Auditorium at
Installation of fire protection pipes and fittings ERW pipes (sch. 40) size: 65, & 75mm Ø; as per high l
Installation of HVAC DUCT WORKS; as per high lighted in dwg.
Inspection for application of Damp Proofing (1st Coat) on top of Primer for External Wall and Top Slab o
Inspection for application of Bituminous Damp Proofing (2nd Coat) on top of Primer for Foundation and
"Inspection of Concrete Pouring for the Wall of Seating Area (1) at Zone-J (SA-8) As Highlighted"
"Inspection of Formwork for the Wall of Seating Area (1) at Zone-J (SA-8) As Highlighted"
Shuttering and Concreting of Blinding for Zone 1A and 1B Internal BLDG. (As Highlighted)
Application of Anti termite Prior Blinding for Zone 1A and 1B internal BLDG. (As Highlighted)
Surface Preparation Prior to Start Backfilling for Zone 1A and 1B internal BLDG. (As Highlighted)
Level, Coordinates of 3 Columns for Colonnades (as Highlighted) Axis 02 AT & 02 AW
Aluminium Flashing & Sealant for boundary Wall (Inner & Outer Faces) @ Grid (EXC4-01/02 to 09/10
Slated layer of 4mm thk Modified Bituminous waterproofing membrane for boundary Wall (Inner & O
Protection layer of 4mm thk Bituminous Protection Board for Boundary wall (Inner & Outer Faces)
Single Layer Modified Bituminous Waterproofing Membrane for Boundary wall (Inner & Outer Faces)
Solvent Base Primer Coating for Boundary wall (Inner & Outer Faces) @ Grid (EXC4-01/02 to 09/10,
Concrete Pouring for Blinding of boundary wall @ span 5, 6 & 7 @ Water Garden at highlighted area
Excavation & Bed preparation for Sub Surface Main Line 200mm & 160mm Part 1 & 110mm & 160mm Lef
Installation of sub surface main line drainage upvc pipes class 4 (200, 160mmØ) as per high lighted in
Installation of sub surface main line drainage upvc pipes class 4 (160, 110mmØ) and perforated bran
Concreting of 3 Column/Buttress for Colonnades (zone 2P) as highlighted axis 02 AT & 02 AW
Shuttering of 3 Column/Buttress for Colonnades (zone 2P) as highlighted axis 02 AT & 02 AW as highlig
Level Location for 2nd Layer Backfilling in Admin BLDG. Zone 7
Application of Protection Layer of 4mm thk Bituminous Protection Board Below Foundation PC 175 to 1
Application of Protection Layer of geotextile sheet 180 gr. Per sqm and screed Below Foundation PC 175
Application of Single Layer of 4mm thk modified bituminous waterproofing membrane Below Foundation
Application of Solvent Base Primer Below Foundation PC 175 to 180 (zone 2N) as highlighted
Surface Preparation Prior to Start Water proofing for Below Foundation PC 175 to 180 (zone 2N) as high
Application of Cementeteous Water proofing Below Foundation (Inner elevation) of Retaining wall (as h
Application of Geotextile Sheet 180 g per sq.m. loose laid Below Foundation (Inner elevation) of Retain
Application of 1st & 2nd Layer 4mm Thick, APP Bituminous Water Proofing Below Foundation (Inner elev
Application of Solvent Base Primer Below Foundation (Inner elevation) of Retaining wall (as highlighted
Soil Preparation After Cutting for Boulder No.RB-245
Final Coat Cementitious Water Proofing for Boundary wall (Inner Face) at Elevation "C to D" & "D to
2nd Coat Cementitious Water Proofing for Boundary wall (Inner Face) at Elevation "C to D" & "D to
Excavation and Surface Preperation prior to start backfilling Sub-Base under Footing of Seating Area (3)
1st Coat Cementitious Water Proofing for Boundary wall (Inner Face) at Elevation "C to D" & "D to A
Stone Cladding for Columns for Boundary wall @ Column No. C56, C57, C58 & C58A (All Sides), As per
Coordinates & Top Level of Blinding of boundary wall @ span 5, 6 & 7 @ Water Garden at highlighted
Excavation & Surface Preparation for foundation of boundary wall @ span 5, 6 & 7 of Boundary Wall
Inspection of Concrete Pouring for the Foundation of Seating Area (1) at Zone-N (SA-5) As Highlighted
Inspection for application of Primer (1 Coat) on External Wall and Top Slab of SBC-02 (Part-3) - As Highl
Inspection for application of Base Primer (50%x50% Bitumin & Water) on Foundation and wall at Saeting
Inspection of Concrete Surface Preperation for external side of SBC-02 (Part-4) prior to start waterproof
Inspection for application of Bituminous Damp Proofing (2nd Coat) on top of Primer for Foundation and
Inspection for application of Bituminous Damp Proofing (1st Coat) on top of Primer for Foundation and
Inspection of Concrete Surface Preperation for external side of SBC-02 (Part-4) prior to start waterproof
Level, Coordinates of 3 Columns for Colonnades (as Highlighted)
Level, Coordinates of Shearkey blinding for retaining wall Between Axis 01-AA to 01-Z
Surface Preparation prior to Water proofing for Boundary wall (Inner & Outer Faces) @ Grid (EXC4
Level, Coordinates of Internal Foundation in Zone 2C (south admin BLDG.) as highlighted
Steel Reinforcement of 9 Internal Foundation in Zone 2C (south admin BLDG.) as highlighted
Shuttering Formworks of 9 Internal Foundation in Zone 2C (south admin BLDG.) as highlighted
Aluminium Flashing & Sealant for waterproofing of boundary wall (Inner Face) @ span 18, 19, 20 & 21
Slated layer of 4mm thk Modified Bituminous waterproofing membrane for boundary wall (Inner Face)
Concreting of 9 Internal Foundation in Zone 2C (south admin BLDG.) as highlighted
Protection layer of 4mm thk Bituminous Protection Board for boundary wall (Inner Face) @ span 18, 1
Single Layer Membrane Water proofing for boundary wall (Inner Face) @ span 18, 19, 20 & 21 at Wate
Primer Coat prior to apply Single Layer Membrane Water proofing for boundary wall (Inner Face) @ s
Surface Preparation prior to Water proofing for boundary wall (Inner Face) @ span 18, 19, 20 & 21 at
Stone Cladding for Boundary wall @ Span 14, 15, 16 & 17 (Outer Face) at Water Garden, as per Atta
Inspection of Crazy cut Stone cladding Installed for Boundary wall (Inner face) at "Elevation B to C"
Inspection of Crazy cut Stone cladding Installed for Boundary wall (Inner face) at "Elevation C & D"
Gravel 3/8 Bedding & Geotextile Surround for Sub-Surface Drain Pipes (160 mm & 110mm Pipes @ Nor
Excavation and Surface Preperation prior to start backfilling Sub-Base under Footing of Seating Area (3)
Inspection for Casting the Blinding Concrete under the Footing of Seating Area (3) at Zone-N(SA- 13) As
Inspection for Casting the Blinding Concrete under the Footing of Seating Area (3) at Zone-N(SA- 12) As
Gravel 3/8 Bedding & Geotextile Surround for Sub Surface Main Line 200mm & 160mm Part 1, at Physi
Inspection for Casting the Blinding Concrete under the Footing of Seating Area (3) at Zone-N(SA- 3) As H
"Inspection of Formwork for the Foundation of Seating Area (1) at Zone-N (SA-6) As Highlighted"
"Inspection of Formwork for the Foundation of Seating Area (1) at Zone-N (SA-5) As Highlighted"
Inspection of Steel Reinforcement for the Foundation and Wall of Seating Area (1) at Zone-N (SA-6) As H
Inspection of Steel Reinforcement for the Foundation and Wall of Seating Area (1) at Zone-N (SA-5) As H
Inspection for Casting the Blinding Concrete under the Footing of Seating Area (3) at Zone-N(SA- 4) As H
Surface Preperation prior to start backfilling behind the boundary wall at Zone-D (As Highlighted)
Inspection of Concrete Pouring for the Foundation of Seating Area (2) at Zone-J (SA-21) As Highlighted
Inspection of Concrete Pouring for the Foundation of Seating Area (2) at Zone-J (SA-20) As Highlighted
Inspection of Concrete Pouring for the Foundation of Seating Area (1) at Zone-N (SA-1) As Highlighted
Excavation and Surface Preperation prior to start backfilling Sub-Base under Footing of Seating Area (3)
Excavation and Surface Preperation prior to start backfilling Sub-Base under Footing of Seating Area (3)
Excavation and Surface Preperation prior to start backfilling Sub-Base under Footing of Seating Area (3)
Excavation and Surface Preperation prior to start backfilling Sub-Base under Footing of Seating Area (3)
Excavation and Surface Preperation prior to start backfilling Sub-Base under Footing of Seating Area (3)
Level, Location for Blinding concrete for Foundation in Tunnel 2 Crescent Zone 6.
Surface Preparation Prior to Start Water proofing for Foundation (Outer) Exterior of Retaining wall (as
Application of Solvent Base Primer for Foundation (Outer) Exterior of Retaining wall (as highlighted) A
Application of 1st & 2nd Layer 4mm Thk APP Bituminous Water Proofing for Foundation (Outer) Exterior
Application of Protection layer of 4mm THK Bituminous Protection Bd. for Foundation (Outer) Exterior o
Application of Slated Layer of 4mm thl modified Bituminous WP for Foundation (inner and Outer) as Hig
Surface Preparation prior to start Water Proofing Under Strip Footing TIP Zone 1A
Application of Solvent Base Primer Under Strip Footing TIP Zone 1A
Application of Single Layer of 4mm THK Bituminous Water Proofing Under Strip Footing TIP Zone 1AA
Application of Protection Layer of Geotextile Sheet and 30mm Screed Protection Under Strip Footing TI
Surface Preparation Prior to Start Water proofing for Below Foundation PC 7 to 12 (zone 1B) as highligh
Application of Solvent Base Primer Below Foundation PC 7 to 12 (zone 1B) as highlighted
Application of Single Layer of 4mm thk modified bituminous waterproofing membrane Below Foundation
Application of Protection Layer of geotextile sheet 180 gr. Per sqm and screed Below Foundation PC 7 t
Application of Protection Layer of 4mm thk Bituminous Protection Board Below Foundation PC 7 to 12 (
Surface Preparation Prior to Start Water proofing for Below Foundation PC 13 to 20 (zone 1C) as highlig
Application of Solvent Base Primer Below Foundation PC 13 to 20 (zone 1C) as highlighted
Application of Single Layer of 4mm thk modified bituminous waterproofing membrane Below Foundation
Application of Protection Layer of geotextile sheet 180 gr. Per sqm and screed Below Foundation PC 13
Application of Protection Layer of 4mm thk Bituminous Protection Board Below Foundation PC 13 to 20
Existing Level for Starting Backfill and Cut in Zone 2Q South Admin BLDG.
Level Location for Rock Level in Admin BLDG. Zone 7
Level Location for 1st Layer Backfilling in Admin BLDG. Zone 7
Installation of sub surface main line drainage upvc pipes class 4 (315mmØ); as per high lighted in dwg
Installation of Rock and Boulder No. RB-288 (1st Layer)
Installation of Rock and Boulder No. RB-312 (4th Layer)
"Inspection of Formwork for the Foundation of Seating Area (1) at Zone-J (SA-1) As Highlighted"
Inspection of Steel Reinforcement for the Foundation and Wall of Seating Area (1) at Zone-J (SA-1) As H
"Inspection of Formwork for the Foundation of Seating Area (2) at Zone-J (SA-21) As Highlighted"
"Inspection of Formwork for the Foundation of Seating Area (2) at Zone-J (SA-20) As Highlighted"
Surface Preparation Prior to Stone Cladding for Boundary wall (Inner Face) @ Span 2, 3, 4, 5, 6, 7, 8, 9
Protection layer of 4mm thk Bituminous Protection Board for boundary wall (Inner Face) @ span 67A,
Aluminium Flashing & Sealant for Retaining wall (Inner Face) @ Span 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12,
Aluminium Flashing & Sealant for Retaining wall (Inner Face) @ Span 42, 43, 44, 45, 46, 47 & 48 of B
Installation of UPVC conduit (Dia. 25mm: 2Pcs each Speaker, 2Pcs. Each Fire Alarm Flashing Beacon &
Installation of UPVC conduit ( Dia.25mm-12Pcs. & Dia.32mm-12Pcs.) for Lighting at the Entrance Hall
Installation of UPVC conduit ( Dia.32mm: Socket Outlet-6Pcs.) for Power at the Entrance Hall of Cres
Excavation & Bed Preparation for Sub-Surface Drain Pipes (Pipes 160mm & 110mm @ North Side). @ M
2nd Coat Damp Proofing for Boundary wall (Inner Face) at Elevation "C to D" & "D to A" @ Maze Gard
1st Coat Damp Proofing for Boundary wall (Inner Face) at Elevation "C to D" & "D to A" @ Maze Garde
Primer Coat Prior to Damp Proofing for Boundary wall (Inner Face) at Elevation "C to D" & "D to A"
Surface Preparation Prior to Water Proofing & Stone Cladding for Boundary wall (Inner Face) at Elev
Coordinates & Top level of Wall @ span 24 & 25, of boundary wall at Water Garden, as per Attached
Shuttering & Concrete Pouring for Wall @ span 24 & 25, of boundary wall at Water Garden, as per A
Steel Reinforcement for Wall @ span 24 & 25, of boundary wall at Water Garden, as per Attached Dr
Coordinates & Top level of Wall @ span 1, of boundary wall at Water Garden, as per Attached Drawin
Shuttering & Concrete Pouring for Wall @ span 1, of boundary wall at Water Garden, as per Attache
Steel Reinforcement for Wall @ span 1, of boundary wall at Water Garden, as per Attached Drawings
Gravel 3/8 Bedding & Geotextile Surround for Sub-Surface Drain Pipes Part 1 (Pipes 110mm @ South
Stone Cladding for Boundary wall @ Span 69 (Inner Face), As per Attached Highlighted Drawing's.
Installation of Rock and Boulder No. RB-312 (3rd Layer)
Installation of Rock and Boulder No. RB-267 ( Full Boulder 3rd & 4th Layer)
Inspection of Steel Reinforcement for the Foundation and Wall of Seating Area (2) at Zone-J (SA-21) As
Inspection of Steel Reinforcement for the Foundation and Wall of Seating Area (2) at Zone-J (SA-20) As
Inspection for Casting the Blinding Concrete under the Footing of Seating Area (3) at Zone-M (SA- 2) As
Inspection for Casting the Blinding Concrete under the Footing of Seating Area (3) at Zone-M (SA- 11) A
Surface Preperation prior to start backfilling for Prayer Area at Zone-G (Internal & External Area) - As Hi
Inspection for application of Damp Proofing (2nd Coat) on top of Primer for External Wall and Top Slab
Inspection for Casting the Blinding Concrete under the Footing of Seating Area (3) at Zone-N (SA- 1) As
Inspection for application of Bituminous Damp Proofing (1st Coat) on top of Primer for Foundation and
Installation of sub surface main line drainage upvc pipes class 4 (250, 160, 110mmØ) and perforated
Excavation and Surface preparation for Boundary Wall at Physic Garden at highlighted area in attach
Inspection of levels after Removing Fill material at Span 5, 6 & 7 of Boundary Wall @ Water Garden at
Geo-Textile for Blinding under boundary wall @ Grid (21 to 23/Left Side) at Aviary Garden, As per Hi
Protection Layer 4mm thk. Bituminous Protection Board (Both sides 500mm wide) for Blinding under bo
Single Layer Water proofing membrane 4mm thk. (Both sides 500mm wide) for Blinding under boundary
2nd Coat Cementitious Water Proofing for Blinding under boundary wall @ Grid (21 to 23/Left Side) at
Solvent Base Primer (Both sides 500mm wide) for Blinding prior to Water proofing membrane under bou
Aluminium Flashing & Sealant for waterproofing of boundary wall (Inner Face) @ span 14, 15, 16 & 17
Slated layer of 4mm thk Modified Bituminous waterproofing membrane for boundary wall (Inner Face)
Protection layer of 4mm thk Bituminous Protection Board for boundary wall (Inner Face) @ span 14, 1
Single Layer Membrane Water proofing for boundary wall (Inner Face) @ span 14, 15, 16 & 17 at Wate
Primer Coat prior to apply Single Layer Membrane Water proofing for boundary wall (Inner Face) @ s
Surface Preparation prior to Water proofing for boundary wall (Inner Face) @ span 14, 15, 16 & 17 at
Excavation & Bed Preparation for Sub-Surface Drain Pipe (315 Dia) @ Grid C/4, at Aviary Garden, At h
Inspection of Gravel 3/8 Bedding & Geotextile for Storm Water Line for Upvc Pipe (Class 4- Ø450 mm )
Inspection for Casting the Blinding Concrete under the Footing of Seating Area (1) at Zone-M (SA- 4) As
Excavation and Surface Preperation prior to start backfilling Sub-Base under Footing of Seating Area (3)
Excavation and Surface Preperation prior to start backfilling Sub-Base under Footing of Seating Area (1)
Soil Preparation After Cutting for Boulder No.RB-241
Inspection of Concrete Pouring for the Foundation of Seating Area (1) at Zone-J (SA-8) As Highlighted
Installation of UPVC conduit (Dia. 25mm: 2Pcs each) and Box (1Pc. Each CAM) for Security (CCTV Syst
Installation of UPVC conduit (Dia. 25mm: 2Pcs each WIFI & 2 pcs. Each CAM) and Box (1Pc. Each WIFI
Existing Level for start Backfilling in Zone 6 1A & 1B.
Level & Location for Excavation at South Administration Building (as highlighted).
Level & Location for Retaining Wall Blinding concrete between Axis X to S (as highlighted).
Inspection of Concrete Surface Preperation for external side of SBC-02 (Part-2) prior to start Waterpro
Notification start Backfilling for 6 Foundations of South Administration Building (as Highlighted) Zone 2
Surface Preparation Prior to Start Backfilling for 6 Foundations of South Administration Building (as Hig
Inspection of Gravel 3/8 Bedding & Geotextile for Storm Water Line for Upvc Pipe (Class 4- Ø400 mm )
"Inspection of Formwork for the Foundation of Seating Area (1) at Zone-J (SA-8) As Highlighted"
Steel Reinforcement for buttress BOI, BOV & BII, BIV 118 at PC 183 Axis 02-AU bottom to Mid CJ
Inspection of Steel Reinforcement for the Foundation and Wall of Seating Area (1) at Zone-J (SA-8) As H
Excavation and Surface Preperation prior to start backfilling Sub-Base under Footing of Seating Area (1)
Inspection for Casting the Blinding Concrete under the Footing of Seating Area (1) at Zone- M (SA- 6) A
Surface Preparation Prior to Start Water proofing for Below Foundation PC 71 to 78 (zone 1M) as highli
Inspection for Casting the Blinding Concrete under the Footing of Seating Area (3) at Zone- I (SA-18) As
Inspection for Casting the Blinding Concrete under the Footing of Seating Area (3) at Zone-J (15) As High
Inspection for Casting the Blinding Concrete under the Footing of Seating Area (3) at Zone-M (SA- 8,9,10
Application of Solvent Base Primer Below Foundation PC 71 to 78 (zone 1M) as highlighted
Application of Single Layer of 4mm thk modified bituminous waterproofing membrane Below Foundation
Application of Protection Layer of geotextile sheet 180 gr. Per sqm and screed Below Foundation PC 71
Application of Protection Layer of 4mm thk Bituminous Protection Board Below Foundation PC 71 to 78
Surface Preparation Prior to Start Backfilling for MCPE 3 (As Highlighted)
Notification start Backfilling for MCPE 3 (As Highlighted)
Installation of upvc pipes class 4 and perforated branches pipes (110mm Ø); as per high lighted in d
Stone Cladding for Boundary wall @ Span 19, 20 & 21 (Inner Face) As per Attached Highlighted Drawi
Final Coat Cementitious water proofing for Boundary wall (Inner face) at Elevation "A to B to C" @ M
2nd Coat Cementitious water proofing for Boundary wall (Inner face) at Elevation "A to B to C" @ Ma
1st Coat Cementitious water proofing for Boundary wall (Inner face) at Elevation "A to B to C" @ Ma
Excavation & Bed preparation for Sub-Surface Drain Pipes at Maze Garden as per highlighted area in
Gravel 3/8 Bedding & Geotextile Surround for Sub-Surface Drain Pipes (Remaining Pipes 160mm & 11
Gravel 3/8 Bedding & Geotextile Surround for Sub-Surface Drain Pipes (110 Dia) @ Grid 2-11 & 11-20/A
Installation of Rock and Boulder No. RB-267 (2nd Layer)
Installation of Rock and Boulder No. RB-312 (2nd Layer)
Installation of Rock and Boulder No. RB-301 (Full Boulder - 5 Layers)
Installation of Rock and Boulder No. RB-151 (Full Boulder - 6 Layers)
Inspection for application of Damp Proofing (1st Coat) on top of Primer for External Wall and Top Slab o
Inspection of Concrete Pouring for the Foundation of Seating Area (2) at Zone-J (SA-24) As Highlighted
Inspection of Concrete Pouring for the Foundation of Seating Area (3) at Zone-J (SA-17 ) As Highlighted
"Inspection of Formwork for the Foundation of Seating Area (2) at Zone-J (SA-24) As Highlighted"
Inspection of Steel Reinforcement for the Foundation and Wall of Seating Area (2) at Zone-J (SA-24) As
"Inspection of Concrete Pouring for the Wall of Play Area (3) at Zone-G As Highlighted"
Level, Location of Plain Concrete below foundation in Administation Building Axis G to J Zone 7 (as Highl
Level, Coordinates of Column Buttress for PC 184 Axis 02-AU
Excavation & Rock level and coordinates for Retaining wall Zone 2 & 3 Axis 01-AA to 01-Z
Steel Reinforcement for buttress BOI, BOV & BII, BIV 119 at PC 185 and 186 Axis 02-AV bottom to Mid C
Installation of main line drainage upvc pipes class 4 (160, 110mmØ); as per high lighted in dwg.
Existing levels at Base Prior to Excavation at Span 5, 6 & 7 of Boundary Wall @ Water Garden at highl
Excavation & Bed preparation for Sub Surface Main Line 200mm & 160mm Part 1) at Physic Garden at
Concrete Pouring Kicker Inside (2nd lift) @ span 24 & 25, of boundary wall at Water Garden, as per
Coordinates & Level for Kicker Inside (2nd lift) @ span 24 & 25, of boundary wall at Water Garden, a
Coordinates & Top Level of Wall @ span 22 & 23, of boundary wall at Water Garden, as per Attached
Concrete Pouring & Shuttering for Wall @ span 22 & 23, of boundary wall at Water Garden, as per A
Surface Preparation Prior to Start Water proofing for Below Foundation PC 167 to 174 (zone 2M) as high
Steel Reinforcement for Wall @ span 22 & 23, of boundary wall at Water Garden, as per Attached Dr
Coordinates & Top Level of Wall @ span 3 & 4, of boundary wall at Water Garden, as per Attached D
Application of Solvent Base Primer Below Foundation PC 167 to 174 (zone 2M) as highlighted
Concrete Pouring & Shuttering for Wall @ span 3 & 4, of boundary wall at Water Garden, as per Atta
Steel Reinforcement for Wall @ span 3 & 4, of boundary wall at Water Garden, as per Attached Draw
Application of Single Layer of 4mm thk modified bituminous waterproofing membrane Below Foundatio
Concrete Pouring & Shuttering for Kicker Inside (2nd lift) @ span 1, of boundary wall at Water Garde
Coordinates & Level for Kicker Inside (2nd lift) @ span 1, of boundary wall at Water Garden, as per
Application of Protection Layer of geotextile sheet 180 gr. Per sqm and screed Below Foundation PC 16
Application of Protection Layer of 4mm thk Bituminous Protection Board Below Foundation PC 167 to 1
Inspection of Concrete Surface Preperation for external side of SBC-02 (Part-3) prior to start waterproof
Inspection of Concrete Pouring for the Foundation of Seating Area (2) at Zone-L (SA-37) As Highlighted
Excavation level and coordinates for admin bldg. foundation Zone 7
Inspection for application of Base Primer (50%x50% Bitumin & Water) on Foundation and wall at Saeting
"Inspection of Formwork for the Foundation of Seating Area (3) at Zone-J (SA-17 ) As Highlighted"
Inspection of Steel Reinforcement for the Foundation and Wall of Seating Area (3) at Zone-J (SA-17 ) As
Inspection for Casting the Blinding Concrete under the Foundation of Seating Area (1) at Zone-N (SA-5)
Shuttering works for Blinding of Retaining wall Foundation SHearkey at Axis 01-W to 01-S
Inspection for Casting the Blinding Concrete under the Foundation of Seating Area (1) at Zone-N (SA-1)
Inspection of Gravel 3/8 Bedding & Geotextile for Storm Water Line for Upvc Pipe (Class 4- Ø400 mm )
Concreting of Blinding of Retaining wall Foundation shearkey at Axis 01-W to 01-S
Installatio of upvc pipes & fitting class 4 (400mm dia.) for storm Water out fall - B main line from
Level, Coordinates, slab of Tunnel 1 (Mid section) as highlighted
Level and Location for retaining wall - top of kicker between axis AH and AL zone 1 inner
Level and Location for retaining wall Shearkey Blinding from Axis W to S (as Highlighted)
Shuttering for Slab of Tunnel 1 (mid section) as highlighted
Steel reinforcement for Slab of Tunnel 1 (mid section) as highlighted
Concreting for Slab of Tunnel 1 (mid section) as highlighted
Installation of main line drainage upvc pipes class 4 (250, 160, 110mmØ) and perforated branches pi
Installation of Subsurface drainage line upvc pipes class 4 perforated branches pipes (110mm Ø); as
Installation of HVAC DUCT WORKS; as per high lighted in dwg.
2nd coat Damp proofing for Boundary wall (Inner Face) at Elevation "A to B to C" @ Maze Garden As
1st coat Damp proofing for Boundary wall (Inner Face) at Elevation "A to B to C" @ Maze Garden As
Primer coat prior to Damp proofing for Boundary wall (Inner Face) at Elevation "A to B to C" @ Maze
Surface Preparation prior to Stone Cladding & water proofing for Boundary wall (Inner Face) at Elev
Excavation & Bed Preparation for Sub-Surface Drain Branch Pipes (110 Dia) @ Grid 2-11 & 11-20/Along
Inspection of Excavation for Storm Water Line for Upvc Pipe (Class 4- Ø450M ) from ( MH-B-02 to
Excavation and Surface Preparation Prior to Backfilling For FW- Force Line at Zone 5A (as Highlighted fr
"Inspection of Formwork for the Wall of Play Area (3) at Zone-G As Highlighted"
Installation of Rock and Boulder No. RB-285 (5th Layer)
Inspection for application of Primer (1 Coat) on External Wall and Top Slab of SBC-02 (Part-1 & Part-2)
Shuttering for Retaining Wall (WALL) (as highlighted at AXIS AJ to AH).
Steel Reinforcement for Retaining Wall (WALL) (as highlighted at AXIS AJ to AH).
Concrete Pouring for Retaining Wall (Wall) (as highlighted at AXIS AJ to AH).
Shuttering for Retaining Wall (Kicker) (as highlighted at AXIS AJ to AH).
Steel Reinforcement for Retaining Wall (Kicker) (as highlighted at AXIS AJ to AH).
Level, Coordinates, Top of Wall Retaining Wall Axis AJ to AH Zone 1 Inner.
Concreting for Retaining Wall (Kicker) (as highlighted at AXIS AJ to AH).
Inspection for Casting the Blinding Concrete under Fuondation of Seating Area (1) aat Zone-J (SA-8) as
Gravel 3/8 Bedding & Geotextile Surround for Sub-Surface Drain Pipes (160 & 110 Dia) @ West Side A
Gravel 3/8 Bedding & Geotextile Surround for Sub-Surface Drain Pipes (110 Dia) @ Grid 7, 8, 9, 10 & 2
Slated layer of 4mm thk Modified Bituminous waterproofing membrane for boundary wall (Outer Face)
Aluminium Flashing & Sealant for waterproofing of boundary wall (Outer Face) @ span 18, 19, 20 & 2
Protection layer of 4mm thk Bituminous Protection Board for boundary wall (Outer Face) @ span 18,
Single Layer Membrane Water proofing for boundary wall (Outer Face) @ span 18, 19, 20 & 21 at Wat
Primer Coat prior to apply Single Layer Membrane Water proofing for boundary wall (Outer Face) @ s
Surface Preparation prior to Water proofing for boundary wall (Outer Face) @ span 18, 19, 20 & 21 a
Inspection of Crazy cut Stone cladding Installed for Boundary wall (Inner face) at "Elevation A, B & E
Aluminium Flashing & Sealant for boundary Wall (Inner Face) @ Grid (EXC4-11/12 to 27/28 & EXC4-29/
Slated layer of 4mm thk Modified Bituminous waterproofing membrane for boundary Wall (Inner Face
Protection layer of 4mm thk Bituminous Protection Board for boundary Wall (Inner Face) @ Grid (EXC
Single Layer Modified Bituminous Waterproofing Membrane for Boundary wall (Inner Face) @ Grid (E
Solvent Base Primer Coating for Boundary wall Inner Face @ Grid (EXC4-11/12 to 27/28 & EXC4-29/30
Surface Preparation prior to Water proofing for Boundary wall Inner Face @ Grid (EXC4-11/12 to 27/
Concrete Pouring & Shuttering for Kicker Inside (2nd lift) @ span 3 & 4, of boundary wall at Water G
Coordinates & Top level of Kicker Inside (2nd lift) @ span 3 & 4, of boundary wall at Water Garden,
Concrete Pouring & Shuttering for Kicker outside (1st lift) @ span 1, of boundary wall at Water Gard
Coordinates & Top level of Kicker outside (1st lift) @ span 1, of boundary wall at Water Garden, as p
Concrete Pouring & Shuttering for Kicker Inside (2nd lift) @ span 22 & 23, of boundary wall at Water
Coordinates & Top level of Kicker Inside (2nd lift) @ span 22 & 23, of boundary wall at Water Garden
Concrete Pouring & Shuttering for Kicker outside (1st lift) @ span 24 & 25, of boundary wall at Wate
Coordinates & Top level of Kicker outside (1st lift) @ span 24 & 25, of boundary wall at Water Garde
Final coat Cementitious water proofing for Boundary wall (Inner Face) at Elevation "B to C (until Exis
2nd coat Cementitious water proofing for Boundary wall (Inner Face) at Elevation "B to C (until Exist
Steel Reinforcement of Column/Buttress for Colonnades (zone 2P) as highlighted 4 Columns axis 02 AW
Shuttering works for Blinding of Retaining wall Foundation at Axis 01-W to 01-S
Concreting of Blinding of Retaining wall Foundation at Axis 01-W to 01-S
Shuttering for Blinding under Foundation of Tunnel 2 (as Highlighted)
Application of Anti termite under Blinding for Foundation of Tunnel 2 (as Highlighted)
Concreting of Blinding for Foundation of Tunnel 2 (as Highlighted)
Surface Preparation Prior to start Backfilling at Retaining wall at Axis AV to AR (Outer Wall) as Highlight
Level, Coordinates for Rock Level, Excavation Level, and Top of Blinding for Retaining wall Axis 01W to 0
"Inspection of Concrete Pouring for Foundation and Kicker of Cesspool-02 (As Highlighted)"
"Inspection of Formwork for Foundation and Kicker of Cesspool-02 (As Highlighted)"
"Mock up Inspection for Stone Boulder Grounting (Boulder No. RB-246) (Mock up-1, Mock up-2, Mock u
Excavation and Surface Preperation prior to start backfilling Sub-Base under Footing of Seating Area (1)
"Mock up inspection of Wall Stone Cladding for Seating Area (1) at Zone-G (SA-11) - As Highlighted ( No
Concreting for 2 outer Wall of Tunnel 1 going Axis 02/1 (Crescent) as highlighted.
Level, Location of Tunnel 1 Wall (as highlighted) 2 outer wall going Axis 02-01.
Shuttering/Formworks for 2 outer wall of Tunnel 1 going Axis 02/1 (Crescent) as highlighted.
Application of Geotextile sheet 180g per sq-m. loose laid below foundation (Inner Elevation) of Retain
Application of 1st Layer 4mm thick, APP Bituminous Waterproofing below Foundation (Inner Elevation)
Application of Solvent Base Primer below Foundation (Inner Elevation) of Retaining Wall (as highlight
Application of Cementetous Waterproofing below Foundation (Inner Elevation) of Retaining Wall (as h
Surface preparation prior to start Waterproofing for below Foundation (Inner Elevation) of Retaining
Primer Coat for Wall & Wall foundations (Surround) @ Jetty # 1 at Boat Garden at highlighted area in a
Concrete Pouring for Kicker Extension at Boundary wall (Inner Face) @ Elevation "A to B to C to D &
Steel Reinforcement & Shuttering for Kicker Extension at Boundary wall (Inner Face) @ Elevation "A t
Primer Coat for Wall & Wall foundations (Surround) @ Jetty # 2 at Boat Garden at highlighted area in
Surface Preparation Prior to Start Stone Cladding for Boundary wall Inner Face @ Span 1, 2, 3, 4, 5, 6,
Installation of UPVC Pipe and fittings (Class 4- Ø400 mm ) of Storm Water - Out Fall - B Main Line fr
Surface Preperation prior to start backfilling behind the boundary wall at Zone-C (As Highlighted)
Surface Preperation prior to start backfilling behind the boundary wall at Zone-E (As Highlighted)
"Inspection of Formwork for the Foundation of Seating Area (2) at Zone-L (SA-37) As Highlighted"
Inspection of Steel Reinforcement for the Foundation and Wall of Seating Area (2) at Zone-L (SA-37) As
Surface Preperation for the existing trench under the Foundation of Seating Area (2) at Zone-K (SA-31)
Level, Coordinates of 2nd Layer Plain Concrete Below Foundation of Strip Footing at TIP zone 1A
Steel Reinforcement of Column/Buttress for Colonnades (zone 2P) as highlighted 2 Columns axis 02 AT
Rock Investigation for Retaining wall at Zone 2 & 3 Axis 01-W to 01-R (as Highlighted)
Shuttering / Formworks for 2nd Layer Plain Concrete Below Foundation of Strip Footing at TIP zone 1A
Concreting of 2nd Layer Plain Concrete Below Foundation of Strip Footing at TIP zone 1A
Installation of main line drainage upvc pipes class 4 (250, 200, 160, 110mmØ) and perforated branch
Excavation & Bed preparation for Sub-Surface Drain Pipes at Maze Garden as per highlighted area
Excavation & Bed Preparation for Sub-Surface Drain Branch Pipes (110 Dia) @ Grid 6-11 & 21/Along Per
Gravel 3/8 Bedding & Geotextile Surround for Sub-Surface Drain Pipes at Maze Garden as per hig
Surface Preparation Prior to Start Crazy Cut Stone Cladding for Boundary wall (Inner Face) @ Butterfl
Stone cladding Installed for Boundary wall Inner Face @ Span 49A, 49B & 50A As per Attached Highli
Shuttering of Column/Buttress for Colonnades (zone 2P) as highlighted 3 foundations axis 02 AT
Concreting of Column/Buttress for Colonnades (zone 2P) as highlighted 3 foundations axis 02 AT
Shuttering of Column/Buttress for PC 184 Axis 02 AU
Application of Anti Termite under Plain Concrete of foundation at South Administration Building (as Hig
Shuttering for Plain Concrete of foundation at South Administration Building (as Highlighted) Zone 2C
Concreting of Plain Concrete of foundation at South Administration Building (as Highlighted) Zone 2C
Level, Location of Tunnel 1 Wall (as Highlighted) Mid wall going Axis 02-1
Soil Preparation After Cutting for Boulder No.RB-322
Level, Coordinates of Column for Colonnades 9 Foundations (as Highlighted)
Soil Preparation After Cutting for Boulder No.RB-321
"Inspection of Steel reinforcement for Foundation of Cesspool-02 As Highlighted"
Inspection of Gravel 3/8 Bedding & Geotextile for Storm Water Line for Upvc Pipe (Class 4- Ø400 mm )
Level, Location of Plain Concrete below foundation in Administation Building Axis G to J Zone 7 (as Highl
Installation of Rock and Boulder No. RB-267 (1st Layer)
Installation of Rock and Boulder No. RB-278 (Full Boulder - 5 Layers)
Inspection for application of Protection Layer 4mm Thick Bituminous Protection Board on top of Bitum
Installation of fire protection pipes and fittings ERW pipes (sch. 40) size: 65, 75, 100, 150mm Ø; as pe
Soil Preperation under footing of seating Area (1) (SA-17) prior to start backfilling - As Highlighted
Soil Preparation for Trench under Boulder No.RB-241
Soil Preparation for trench under Boulder No. RB-245
Installation of Rock and Boulder No. RB-238 (Full Boulder - 5 Layers)
Installation of Rock and Boulder No. RB-150 (4th Layer)
Installation of Rock and Boulder No. RB-151 (1st Layer)
Coordinates & Top level of Footing @ span 24 & 25, of boundary wall at Water Garden, as per Attac
Installation of Rock and Boulder No. RB-312 (1st Layer)
Concrete Pouring & Shuttering for Footing @ span 24 & 25, of boundary wall at Water Garden, as pe
Installation of Rock and Boulder No. RB-301 (1st Layer)
Steel Reinforcement for Footing & Kicker @ span 24 & 25, of boundary wall at Water Garden, as per
Inspection for application of Bituminous Damp Proofing (2nd Coat) on top of Primer for Foundation and
Concrete Pouring & Shuttering for Kicker outside (1st lift) @ span 22 & 23, of boundary wall at Wate
Level, Coordinates of 1st Layer Plain Concrete below Foundaion of Strip Footing at TIP zone 1A.
Coordinates & Top level of Kicker outside (1st lift) @ span 22 & 23, of boundary wall at Water Garde
Inspection for application of Bituminous Damp Proofing (1st Coat) on top of Primer for Foundation and
Excavation and Surface Preperation prior to start backfilling under Foundation of Seating Area (1) (SA-14
Concrete Pouring & Shuttering for Kicker outside (1st lift) @ span 3 & 4, of boundary wall at Water
Shuttering/Formworks for 1st Layer Plain Concrete below Foundation of Strip Footing at TIP Zone 1A.
Coordinates & Top level of Kicker outside (1st lift) @ span 3 & 4, of boundary wall at Water Garden,
Concrete Pouring & Shuttering for Footing @ span 1, of boundary wall at Water Garden, as per Attac
Coordinates & Top level of Footing @ span 1, of boundary wall at Water Garden, as per Attached Dra
Application of Anti Termite under Plain Concrete for Foundation of Strip Footing at TIP Zone 1A.
Steel Reinforcement for Footing & Kicker @ span 1, of boundary wall at Water Garden, as per Attach
1st coat Cementitious water proofing for Boundary wall (Inner Face) at Elevation "B to C (until Existi
Aluminium Flashing & Protection Sealant for Boundary Wall Inner Face @ Span 46, 47 & 48, at Boundar
Concreting of 1st Layer Plain Concrete Below Foundation of Strip Footing at TIP zone 1A
Steel Reinforcement for 3 Wall of Tunnel 1 going Axis 02/1 (crescent) as highlighted
Shuttering / Formworks for Mid Wall of Tunnel 1 going Axis 02/1 (crescent) as highlighted
Concreting for Mid Wall of Tunnel 1 going Axis 02/1 (crescent) as highlighted
Installation of Boulder 243, 245 & 246.
Installation of Rock and Boulder No. 138 (First Layer)
Inspection for Casting the Blinding Concrete for Footing of Prayer Area at Zone 1
Concrete Surface Preperation prior to start the Waterproofing at Seating Area (3) at Zone-G (SA-20,21)
"Inspection of Concrete Pouring for the Foundation of Play Area (3) at Zone-G As Highlighted"
"Inspection of Concrete Pouring for the Wall of Seating Area (3) at Zone-G (SA-19) As Highlighted"
Inspection for application of Base Primer (50%x50% Bitumin & Water) on Foundation and wall at Saeting
2nd Coat Bituminous Damp proofing for Boundary wall (Inner Face) @ Elevation B to C, D to A & (Some
1st Coat Bituminous Damp proofing for Boundary wall (Inner Face) @ Elevation B to C, D to A & (Some
Primer coat prior to Damp proofing for Boundary wall (Inner Face) @ Elevation B to C, D to A & (Some
Concrete Pouring for Kicker Extension at Boundary wall (Inner Face) @ Elevation B to C, D to A & (Som
2nd coat Cementitious water proofing for Boundary wall (Inner Face) at Elevation D to A to B (until E
Aluminium Flashing & Sealant for boundary Wall (Inner Face) @ Span 31, 32 & 33, As per Attached Hi
Slated layer of 4mm thk Modified Bituminous waterproofing membrane for boundary Wall (Inner Face
Protection layer of 4mm thk Bituminous Protection Board for boundary Wall (Inner Face) @ Span 31,
Single Layer Membrane Water proofing for Boundary wall (Inner Face) @ Span 31, 32 & 33, As per Atta
Aluminium Flashing & Sealant for boundary Wall (Inner Face) @ Span 34, 35, 36 & 37, As per Attache
Slated layer of 4mm thk Modified Bituminous waterproofing membrane for boundary Wall (Inner Face
Protection layer of 4mm thk Bituminous Protection Board for boundary Wall (Inner Face) @ Span 34,
Single Layer Membrane Water proofing for Boundary wall (Inner Face) @ Span 34, 35, 36 & 37, As per
Protection Layer of 4mm Thick Bituminous Protection Board at outer Foundation of South Small Mosqu
Solvent Base Primer Coat for Boundary wall (Inner Face) @ Span 34, 35, 36 & 37, As per Attached Hig
Level Location at Column in South Bridge (Axis 02/B) Zone 7 2nd
Level, Location of 1st layer (backfill) in Administation Building Axis G to J Zone 7
Steel Reinforcement of Column/Buttress for Colonnades (zone 2P) as highlighted 5 foundations axis 02
Inspection to Check protection Layer of 4mm tick Bitminous Protection Board for Strip Footing Between
Inspection to Check Single Layer of 4mm thick modified Bitminous water proofing membrane for Strip
Inspection to check backfill level first layer in south small mosque
Inspection of Concrete Casting SRC, C(16-20) Under Pile caps 1,2,3,4,6 & 8
Installation of Rock and Boulder No. RB-150 (3rd Layer)
Level, Location for Excavation and blinding for Retaining wall Between Axis AA to AB
"Inspection of Formwork for the Wall of Play Area (3) at Zone-G As Highlighted"
Inspection for application of Protection Layer 4mm Thick Bituminious Protection Board on top of Bit
Inspection of Steel Reinforcement for the Foundation and Wall of Play Area (03) at Zone-G As Highlight
Installation of Rock and Boulder No. RB-238 (3rd Layer)
Installation of Rock and Boulder No. RB-285 (5th Layer)
Coordinates & Top level of Footing @ span 22 & 23 of boundary wall at Water Garden, as per Attach
Coordinates & Top level of Footing @ span 3 & 4 of boundary wall at Water Garden, as per Attached
Concrete pouring & Shuttering for Footing @ span 22 & 23 of boundary wall at Water Garden, as per
Steel Reinforcement for Footing & Kicker @ span 22 & 23 of boundary wall at Water Garden, as per
Concrete pouring & Shuttering for Footing @ span 3 & 4 of boundary wall at Water Garden, as per A
Steel Reinforcement for Footing & Kicker @ span 3 & 4 of boundary wall at Water Garden, as per At
Geo Textile (Both sides 500mm wide) for Blinding under boundary wall Span 1, 2, 3 & 4 @ Water Gard
Protection Layer 4mm thk. Bituminous Protection Board (Both sides 500mm wide) for Blinding under
Single Layer Water proofing membrane 4mm thk. (Both sides 500mm wide) for Blinding under boundary
Solvent Base Primer Coating (Both sides 500mm wide) for Blinding prior to Water proofing membrane
1st coat Cementitious water proofing for Boundary wall (Inner Face) at Elevation D to A to B (until D
Stone Cladding Installed for Boundary wall Inner Face @ Span 26, 27, 28, 29 & 30 As per Attached Hi
Aluminium Flashing & Sealant for boundary Wall (Outer Face) Grid (EXC4-11/12 to EXC4-28/27) & (EXC
Slated layer of 4mm thk Modified Bituminous waterproofing membrane for boundary Wall (Outer Face
Protection layer of 4mm thk Bituminous Protection Board for boundary Wall (Outer Face) Grid (EXC4-
Single Layer Membrane Water proofing for boundary Wall (Outer Face) Grid (EXC4-11/12 to EXC4-28/2
Solvent Base Primer Coat prior to apply Single Layer Membrane Water proofing for boundary Wall (Oute
Surface Preparation & Mortar Cantstrip prior to start water proofing for Boundary Wall (Outer Face)
Sand Blasting prior to start Stone cladding & water proofing for Boundary Wall (Outer Face) Grid (EXC
Inspection of Excavation for Storm Water Line for Upvc Pipe (Class 4- Ø400M ) from ( MH-B-03 to
Installation of Rock and Boulder No. RB-238 (2nd Layer)
Installation of Rock and Boulder No. RB-246 (Full Boulder - 5 Layers)
Inspection for application of Bituminous Damp Proofing (2nd Coat) on top of Primer at Prayer Area Zone
Inspection for application of Bituminous Damp Proofing (1st Coat) on top of Primer at Prayer Area Zone
2nd Coat Cementitious Water Proofing for Blinding prior to Water proofing under boundary wall Span
1st Coat Cementitious Water Proofing for Blinding prior to Water proofing under boundary wall Span
Surface preparation of Blinding prior to Water proofing under boundary wall Span 1, 2, 3 & 4 @ Wate
Concrete Pouring for Blinding of boundary wall @ span 24 & 25 @ Water Garden. at highlighted area
Concrete Pouring for Lintels of Doors & Walls & Stiffner Column's at Grid between 17-18/E-I, 17-19/M
Steel Reinforcement and Shuttering for Lintels of Doors & Walls & Stiffner Column's at Grid between
Inspection of Block Work upto Lintel Height at Grid between 17-18/E-I, 17-19/M-Q, 4-5/T-N, as highli
Crazy cut Stone cladding Installed for Boundary wall @ "Elevation "D" to "C" (Outer face) @ Maze Garde
Aluminium Flashing & Sealant for waterproofing of boundary wall (Outer Face) @ span 14, 15, 16 & 17
Slated layer of 4mm thk Modified Bituminous waterproofing membrane for boundary wall (Outer Face)
Protection layer of 4mm thk Bituminous Protection Board for boundary wall (Outer Face) @ span 14, 15
Primer Coat prior to apply Single Layer Membrane Water proofing for boundary wall (Outer Face) @ sp
Surface Preparation prior to start Backfilling at South Administration Building (as Highlighted) Zone 2C
Crazy cut Stone cladding Installed for Boundary wall Outer face @ Between Elevation "D to A" & "Part o
Stone cladding Installed for Boundary wall Inner Face @ Span 23, 24 & 25, As per Attached Highlighted
Notification start Construction of South Administration Building (as Highlighted) Zone 2C
Stone cladding Installed for Boundary wall Outer Face @ Span 49A, 49B & 50A As per Attached Highligh
Inspection for casting the 50mm thick Screed Protection under foundation of Cesspool-2 (As Highlighted
Inspection for application of Protection layer of Geo-Textile Sheet-180gr/sqm on Top of Bituminous w
Installation of Rock and Boulder No. RB-150 (2nd Layer)
Level, Location of Tunnel 1 Foundation (as Highlighted) going Axis 02/1
Installation of Rock and Boulder No. RB-279 (FULL BOULDER - 4 LAYERS)
Level, Location of Tunnel 1 Wall (as Highlighted) Mid wall
Inspection for application of Primer (50%x50% Bitumin & Water) on Foundation and 1st Part of wall at
"Inspection of Concrete Pouring for the Wall of Seating Area (2) at Zone-K (SA-29 & 30) As Highlighted"
Soil Preparation under Boulder No. RB-245
Notification to start Excavation for FW- Force Line at Zone 4 (as Highlighted from Point 51 up to 54 )
Drilling works for 4 mini piles at zone-2C (698,699,700 & 701)
Installation of main line drainage upvc pipes class 4 and perforated branches pipes (110mm Ø); as pe
Installation of Subsurface drainage main line upvc pipes class 4 and perforated branches pipes (11
Soil Preparation under Boulder no. 143.
Existing Level Prior to Start Backfill For Crescent Zone 2C Axis G to J
Surface Preparation Prior to start backfilling In between inner and outer retaining wall Axis AV to Nort
Concreting for Wall of Tunnel 1 Near MCPE (crescent) as highlighted 2 outer walls
Geotextile sheet 180 gr. Per sq.m. and screed above foundation (Inner and Outer) of Retaining wallat ax
Shuttering / Formworks for Wall of Tunnel 1 Near MCPE (crescent) as highlighted (mid wall)
Concreting for Wall of Tunnel 1 Near MCPE (crescent) as highlighted (mid wall)
Probing & Grouting works at Zone-G,Energy center-2 Foundation (1 Point) Part-4
4th & 5th layers Stack Boulders Installed at Planted bed # 2 @ water play Garden, At highlighted area
3rd layer Stack Boulders Installed at Planted bed # 3 @ water play Garden, At highlighted area in atta
Stack Boulders wall Installed 3rd layer at Planted bed # 2 at Water Play Garden, at highlighted area in
2nd layer Stack Boulders Installed at Planted bed # 2 & 3 @ water play Garden, At highlighted area in
Gravel 3/8 Bedding & Geotextile Surround for Sub-Surface Drain Branch Pipes (110 Dia) @ Grid 1/Along
Notification to Start Removal of old crescent monuments & Soil Material Beside Boundary wall Span 3
Gravel 3/8 Bedding & Geotextile Surround for Sub-Surface Drain Pipes (110 Dia) @ Zone-6 & Near Zone-
"Inspection for application of 2nd Layer of 4mm thick Modified Bituminous Waterproofing on top of Pri
"Inspection for application of 1st Layer of 4mm thick Modified Bituminous Waterproofing on top of Pri
"Inspection of Formwork for the Wall of Seating Area (2) at Zone-K (SA-29 & 30) As Highlighted"
Installation of GEWI Bars and grouting for 4 mini piles at zone-2C (698,699,700 & 701)
Inspection of Excavation for Storm Water Line for Upvc Pipe (Class 4- Ø400M ) from ( MH-B-04 to
Steel Reinforcement for buttress BOI, BOV & BII, BIV 118 at PC 183 and 184 Axis 02-AU bottom to Mid C
Soil Preparation under Boulder No. RB-241
Excavation & Bed preparation for Sub-Surface Drain Pipes at Maze Garden as per highlighted area
Coordinates & Top level of Wall & Column's @ span 20 & 21 and C20 & C21 for boundary wall at Water
Surface Preparation After Backfill prior to Blinding of boundary wall @ span 1, 2, 3 & 4 with Levels &
Concrete pouring & Shuttering for Walls & Column's @ span 20 & 21 and C20 & C21 for boundary wall a
Surface preparation prior to Water proofing for wall & Wall foundations (Surround) @ Jetty # 2 at Boat
Concrete pouring for Footing of Boundary wall @ Grid (1-11/Left side) (16-20/Right side) at Aviary Gard
Installation of Rock and Boulder No. RB-278 (1st Layer)
Inspection for application of Solvent Base Primer Coating on Top of Blinding concrete under the founda
Installation of Rock and Boulder No. RB-313 (Full Boulder - 6 Layers)
Concrete Surface Preperation prior to start the Waterproofing at Seating Area (1) at Zone-G (SA-11) As
Location, Level for Retaining wall (Top of Wall) at Axis AL to AN - INNER
Steel Reinforcement for Foundation of Tunnel 1 (crescent) as highlighted going to axis 02/1
Shutter Formworks for Foundation of Tunnel 1 (crescent) as highlighted going Axis 02/1
Concreting for Foundation of Tunnel 1 (crescent) as highlighted Going axis 02/1
Level Location at Column in South Bridge (Axi 02/B) Zone 7 2nd
Inspection of Backfilling behind the Boundary Wall at Zone-B - As Highlighted
Soil Preparation under Boulder No. RB-267
Excavation and Surface Preparation Prior to Backfilling For Telecommunication & (Fire & Scurity)
Notification to Start Excavation for Upvc Pipe (Class 4- Ø315, Ø400M & Ø450 ) for Storm Water Drainag
Coordinates & Top level of Wall & Column's @ span 18 & 19 and C18 & C19 for boundary wall at Water
Concrete Pouring for Blinding of boundary wall @ span 1, 2, 3 & 4 @ Water Garden. at highlighted area
Steel Reinforcement for Wall & Column's @ span 20 & 21 and C20 & C21 for boundary wall at Water Ga
Concrete pouring & Shuttering for Wall & Column's @ span 18 & 19 and C18 & C19 for boundary wall a
Excavation & Bed Preparation for Sub-Surface Drain Branch Pipes (110 Dia) @ Grid 1/Along Peripheral wa
Surface Preparation prior to Install Riyadh stone cladding for Boundary wall Inner Face @ Span 49A, 4
Mockup for Grouting colour (Ref # 233) for Stone Cladding of Boundary wall, @Span 61A As per Attache
Excavation & Bed Preparation for Sub-Surface Drain Pipes (110 Dia) @ Zone 6 & part of Zone 1, at Disco
Concrete pouring for Footing of Boundary wall (1-11/Right side) at Aviary Garden, As per Highlighted in
Coordinates & Top level of Kicker Outside (1st Lift) @ span 20 & 21 of boundary wall at Water Garde
Installation of PVC conduit (Dia.160mm-4 pcs./Duct tag no. BB/D-LV/60) at Water Garden Boundary W
Installation of Subsurface drainage main line upvc pipes class 4 and perforated branches pipes (11
Steel Reinforcement for Column of Bridge to South Tower (as Highlighted) in Axis 02/B 2nd
Formworks / Shuttering for Column of Bridge to South Tower (as Highlighted) in Axis 02/B 2nd
Concreting for Column of Bridge to South Tower (as Highlighted) in Axis 02/B 2nd
Protection layer of 4mm thick bituminous protection board, spotted bonded for above Foundation and wa
Level, Location of Tunnel 1 Wall (as Highlighted) 2 outer wall
Coordinates & Top level of Blinding of boundary wall @ span 24 & 25 @Water Garden. at highlighted ar
Coordinates & Top level of Blinding of boundary wall @ span 1, 2, 3 & 4 with Levels & Coordinates, @
Single Layer Membrane Water proofing for boundary wall (Outer Face) @ span 16 & 17 at Water Garden
Stack Boulders for Layer 4, 5 & 6 Installed at Planted Bed # 1 @ Water Play Garden, at highlighted area
Steel Reinforcement & Shuttering for Kicker Extension at Boundary wall (Inner Face) @ Elevation B to A
Primer coat prior to start Membrane water proofing for Boundary wall (Inner Face) @ Span 31, 32 & 33,
Primer coat prior to start Single layer Membrane for Boundary Wall (Outer Face) Grid (EXC4-11/12 to E
"Inspection of Concrete Pouring for the Wall of Seating Area (3) at Zone-G (SA-24) As Highlighted"
"Inspection of Concrete Pouring for the Wall of Seating Area (2) at Zone-K (SA-28 & 32) As Highlighted"
Installation of earthing clamps with conductor 70mm (2pcs.) for earthing reinforcement steel re-bar
Notification to Start Excavation Site Fire & Scurity Distribution Route (As Highlighted)
Notification to Start Excavation for SiteTelecommunication Distribution Route (As Highlighted)
Coordinates & Top level of Kicker Inside (2nd Lift) @ span 20 & 21 of boundary wall at Water Garden, a
Concrete Pouring & Shuttering for Kicker Inside(2nd Lift) @span 20 & 21 of boundary wall at Water Gar
Gravel 3/8 Bedding & Geotextile Surround for Sub-Surface Drain Branch Pipes (110 Dia) @ Grid 2-7 & 11
Protection Board for Water proofing of Boundary wall (Inner Face) @ Span 76, 77, 78, 79, 80, 81 & 82 A
Stone Cladding for Boundary wall Span 62 (Inner & Outer Face) and Span 63 (Inner Face) As per Attach
Stone Cladding for Boundary wall Inner Face, @ Span 71, 72 & 73 As per Attached Highlighted Drawing's
Installation of Rock and Boulder No. RB-279 (1st Layer)
Surface Preperation prior to start backfilling for Prayer Area at Zone-K (Internal & External Area) - As Hi
Inspection for application of Cementitious water Proofing (3rd Coat) at Prayer Area Zone-G - as Highligh
Inspection for application of Cementitious water Proofing (2nd Coat) at Prayer Area Zone-G - as Highlig
Steel Reinforcement for Wall & Column's @ span 18 & 19 and C18 & C19 for boundary wall at Water Ga
Concrete Pouring for Blinding of boundary wall @ span 22 & 23 @ Water Garden. at highlighted area in
Aluminium flashing & Protection Sealent for Boundary wall Inner Face @ Span 15, 16, 17 & 18, As per A
Surface Preparation prior to start water proofing for Boundary wall (Inner Face) @ Span 34, 35, 36 & 37
Surface Preparation prior to start water proofing for Boundary Wall (Outer Face) Grid (EXC4-11/12 to E
Surface Preperation prior to start backfilling behind the boundary wall at Plaza Area (Near Entrance Gate
Inspection for Casting the Blinding Concrete under foundation of Cesspool -2
Inspection of Concrete Surface Preperation for external side of SBC-02 (Part-1) prior to start waterproof
"Inspection of Formwork for the Wall of Seating Area (2) at Zone-K (SA-28 & 32) As Highlighted"
Inspection for application of Cementitious water Proofing (1st Coat) at Prayer Area Zone-G - as Highligh
Inspection for Casting the Blinding Concrete under the Footing of Play Area (03) at Zone-G As Highlight
Application of Protection layer of 4mm thick bituminous protection board spot bonded for Foundation
Application of 1st and 2nd Layer 4mm Thick APP modified bituminous water proofing membrane reinforc
Application of Solvent Base Primer for Foundation (Inner elevation) Exterior of Retaining wall (as highli
Surface Preparation Prior to Start Water proofing for Foundation (Inner elevation) Exterior of Retaining
Notification prior to start Excavation for Retaining wall Foundation of Crescent Zone 2 and 3 (as Highli
Coordinates and Top Level of Foundation Concrete for Colonnades 9 Foundations (as Highlighted)
Crazy cut Stone cladding Installed for Boundary wall @ Centre of "Elevation "D" to "A" (Outer face) @
Coordinates & Top of Blinding of boundary wall @ span 22 & 23 @ Water Garden. at highlighted area in
Excavation & Surface Preparation for foundation of boundary wall @ span 22, 23, 24 & 25 with Levels
Single Layer Membrane Water proofing for boundary wall (Outer Face) @ span 14 & 15 at Water Garden
Geo-Textile for Blinding under boundary wall @ span 14, 15, 16 & 17 at Water Garden at highlighted ar
Protection Layer 4mm thk. Bituminous Protection Board (Both sides 500mm wide) for Blinding under bo
Single Layer Water proofing membrane 4mm thk. (Both sides 500mm wide) for Blinding under boundary
Surface preparation prior to Water proofing for Footing's, Column's, wall & Wall foundations (Surround
Aluminium flashing & Protection Sealent for Boundary wall Inner Face @ Span 40 & 41, As per Attached
Aluminium flashing & Protection Sealent for Boundary wall Inner Face @ Span 19, 20 & 21, As per Attac
Aluminium flashing & Protection Sealent for Boundary wall Inner Face @ Span 49A, 49B & 50A, As per A
Stone Cladding for Boundary wall @ Span 71, 72 & 73 (Outer Face) As per Attached Highlighted Drawing
Coordinates & Top of Footing of Boundary wall (Grid 1-10/Left Side, 1-12/Right side, 16-20/Right Side)
Steel Reinforcement & Shuttering for Footing & Buttress of Boundary wall (Grid 1-10/Left Side, 1-12/Rig
Installation of Rock and Boulder No. RB-246 (Full Boulder - 5 Layers)
Installation of earthing clamps with conductor 70mm (10pcs.) for earthing reinforcement steel re-ba
Steel Reinforcement of foundation for Colonnades (zone 2P) as highlighted 9 foundations
Formworks / Shuttering of foundation for Colonnades (zone 2P) as highlighted 9 foundations
Concreting of foundation for Colonnades (zone 2P) as highlighted 9 foundations
Steel Reinforcement for Retaining Wall (WALL) (as Highlighted at AXIS AL TO AN)
Shutter Formworks for Retaining Wall (WALL) (as Highlighted at AXIS AL TO AN)
Concreting for Retaining Wall (WALL) (as Highlighted at AXIS AL TO AN)
Primer coat Prior to Start Membrane Water proofing for Boundary wall @ span 14 & 15, (Outer Face) a
Concrete Pouring & Shuttering for Kicker Outside (1st Lift) @ span 20 & 21 of boundary wall at Water
Excavation & Bed Preparation for Sub-Surface Drain Branch Pipes (110 Dia) @ Grid 2-7 & 11-15/Along Pe
Level, Location of Column in South Bridge (Axis 02/B1) Zone 7
All Expansion Joint's Repaired & Installed of Filler Board and All Control Joint's Repairing, Cutting &
Level, Location of Tunnel 1 Foundation Near MCPE (as Highlighted)
Surface Preparation prior to Primer for Membrane water proofing for Boundary wall (Inner Face) @ Spa
Concrete pouring for Lintels of Doors & Walls & Stiffner Column's at Shower Area @ Grid Between 7-9/R
Level Location at Column in South Bridge (Axi 02/A1) Zone 7 2nd
Steel Reinforcement and Shuttering for Lintels of Doors & Walls & Stiffner Column's at Shower Area @
Notification Prior to Start Chipping, Repair & Tie Rod Holes filling for Roof Beam and Parapet Prior to
Excavation & Surface Preparation for Footing's (12 no's) in Back of House @ Grid 15-22/left side, at Avi
Geo-Textile for Blinding under boundary wall @ Grid (1/Left Side, 1-11/Right side & 16-19/Right Side) a
Protection Layer 4mm thk. Bituminous Protection Board (Both sides 500mm wide) for Blinding under bou
Single Layer Water proofing membrane 4mm thk. (Both sides 500mm wide) for Blinding under boundary wa
Solvent Base Primer (Both sides 500mm wide) for Blinding prior to Water proofing membrane under boun
2nd Coat Cementitious Water Proofing for Blinding under boundary wall @ Grid (1/Left Side, 1-11/Right
1st Coat Cementitious Water Proofing for Blinding under boundary wall @ Grid (1/Left Side, 1-11/Right
Surface preparation of Blinding prior to Water proofing under boundary wall @ Grid (1/Left Side, 1-11/
"Inspection of Concrete Pouring for Walls and Top Slab of SBC-04 As Highlighted"
Inspection of Concrete Pouring for the Wall of Seating Area (3) at Zone-K (SA-25) As Highlighted
Inspection of Concrete Pouring for the Foundation of Seating Area (3) at Zone-G (SA-19) As Highlighted
"Inspection of Formwork for the Wall of Seating Area (3) at Zone-G (SA-24) As Highlighted"
Anti Termite Treatment Prior to Cast Blinding of Slab on Grade & Grade beam at Grid 6-7/Q-R & 5-7/
Installation of HVAC DUCT WORKS; as per high lighted in dwg.SERVICE No. Line # 2, 3, 7, 8
Surface Preparation Prior to Start Backfilling (Grading) at Zone-B (Area -04) as highlighted
Notification to Start Excavation Site Fire & Scurity Distribution Route (As Highlighted)
Notification to Start Excavation for SiteTelecommunication Distribution Route (As Highlighted)
Inspection of First layer Block layout at grid between 8-9/F-G, 4-5/T-V, 10-12/R-S, 17-18/E-I, 16/N-Q,
Coordinates & Top level of Kicker inside (2nd Lift) @ span 18 & 19 for boundary wall at Water Garden,
Concrete Pouring & Shuttering for Kicker inside (2nd Lift) @ span 18 & 19 for boundary wall at Water
Stone cladding mockup for Boundary walls of Water Garden, Physic Garden and Sound & Light Garden
Stone Cladding for Boundary wall @ Span 64 & 65 (Inner Face) As per Attached Highlighted Drawing's.
"Inspection of Formwork and Level for Walls and Top Slab of SBC-04 As Highlighted"
"Inspection of Formwork for the Wall of Seating Area (3) at Zone-K (SA-25) As Highlighted"
"Inspection of Formwork for the Wall of Seating Area (3) at Zone-G (SA-19) As Highlighted"
Surface Preperation Prior to Start Grading at Zone-L ( Area -05-1) as highlighted
Installation of main line drainage upvc pipes class 4 and perforated branches pipes (110mm Ø); as pe
Coordinates & Top level of Footing @ span 20 & 21 of boundary wall at Water Garden, as per Attached
Concrete Pouring & Shuttering for Footing @ span 20 & 21 of boundary wall at Water Garden, as per A
Steel Reinforcement for Footing & Kicker @ span 20 & 21 of boundary wall at Water Garden, as per Att
Surface Preparation of Boundary wall Prior to Water proofing & Stone Cladding @ span 14, 15, 16 & 17
2nd caot Damp proofing for Boundary wall Footings Inner Face @ Span 67C, 68A, 68B, 69, 70, 71, 72 &
1st caot Damp proofing for Boundary wall Footings Inner Face @ Span 67C, 68A, 68B, 69, 70, 71, 72 & 7
Primer caot Damp proofing for Boundary wall Footings Inner Face @ Span 67C, 68A, 68B, 69, 70, 71, 72
Concrete pouring for Lintels of Doors & Walls & Stiffner Column's, @ Grid Between 9-10/R-W, 12-14/R-
Steel Reinforcement and Shuttering for Lintels of Doors & Walls & Stiffner Column's, @ Grid Between
Steel Reinforcement for Wall of Tunnel 1 near MCPE (crescent) as highlighted
Installation of Rock and Boulder No. RB-150 (First Layer)
Inspection of Steel Reinforcement for the Foundation and Wall of Seating Area (3) at Zone-G (SA-19) As
"Inspection of Concrete Pouring for the Wall of Seating Area (1) at Zone-G (SA-12) As Highlighted"
"Inspection of Concrete Pouring for the Wall of Seating Area (3) at Zone-G (SA-21) As Highlighted"
Shuttering / Formworks for Wall of Tunnel 1 Near MCPE(crescent) as highlighted
Surface Preparation under Boulder No. RB-279
Steel Reinforcement for Column of CENTRAL Bridge axis 02-AJ
Shuttering / Formworks for Column of CENTRAL Bridge axis 02-AJ
Concreting works for Column of CENTRAL Bridge axis 02-AJ
Steel Reinforcement for Column of Bridge to South Tower (as Highlighted) in Axis 02/A 2nd
Excavation & Surface Preparation for foundation of boundary wall @ span 1, 2, 3 & 4 with Levels & Co
Geo-Textile for Blinding under boundary wall Span 18, 19, 20 & 21 @ Water Garden at highlighted area
Protection Layer 4mm thk. Bituminous Protection Board (Both sides 500mm wide) for Blinding under bo
Single Layer Water proofing membrane 4mm thk. (Both sides 500mm wide) for Blinding under boundary
Solvent Base Primer (Both sides 500mm wide) for Blinding prior to Water proofing membrane under bo
2nd Coat Cementitious Water Proofing for Blinding prior to Water proofing under boundary wall Span 1
1st Coat Cementitious Water Proofing for Blinding prior to Water proofing under boundary wall Span 1
Surface preparation of Blinding prior to Water proofing under boundary wall Span 18, 19, 20 & 21 @ Wa
Coordinates & Top level of Wall of boundary wall @ (EXC4-01/02 to EXC4-09/10) at Physic Garden at hig
Concrete Pouring & Shuttering for Wall of boundary wall @ (EXC4-01/02 to EXC4-09/10) at Physic Garde
Notification for Cleaning & Surface Preparation and Crack Repair prior to Start water proofing at Roo
Notification Prior to Start Repair of Parapet wall of Management Building, (External & Internal Faces)
Concrete Pouring for Footing of Boundary wall (Grid 11-20/Left Side) at Aviary Garden, As per Highlight
Shuttering/Formworks for Column of Bridge to South Tower (as Highlighted) in Axis 02/A 2nd
Reinforcement Inspection for Top Slab of SBC-04
Concreting for Column of Bridge to South Tower (as Highlighted) in Axis 02/A 2nd
"Inspection of Formwork for the Wall of Seating Area (1) at Zone-G (SA-12) As Highlighted"
Level, Location of Central Bridge Column at Axis 02-AJ (as Highlighted)
"Inspection of Formwork for the Wall of Seating Area (3) at Zone-G (SA-21) As Highlighted"
Level Location at Column in South Bridge (Axi 02/A) Zone 7 2nd
Surface Preperation Prior to Start Grading at Zone-L ( Area -09) as highlighted
Surface Preparation Prior to Start Backfilling (Grading) at Zone-B (Area -03) as highlighted
Installation of main line drainage upvc pipes class 4 and perforated branches pipes (110mm Ø); as pe
Installation of main line drainage upvc pipes class 4 and perforated branches pipes (110mm Ø); as pe
Installation of sub surface drainage upvc pipes class 4 and perforated branches pipes (110mm Ø); as
Steel Reinforcement for Column of CENTRAL Bridge axis 02-AI
Shuttering / Formworks for Column of CENTRAL Bridge axis 02-AI
Concreting works for Column of CENTRAL Bridge axis 02-AI
Coordinates & Top level of Kicker (1st Lift) @ span 18 & 19 for boundary wall at Water Garden, as per
Level, Location of Central Bridge Column at Axis 02-AI (as Highlighted)
Concrete Pouring for Kicker (1st Lift) @ span 18 & 19 for boundary wall at Water Garden, as per Attach
Steel Reinforcement & Shuttering for Kicker @ span 18 & 19 for boundary wall at Water Garden, as per
Concrete Pouring & Shuttering for Abutment Wall @ Jetty # 2 at Boat Garden at highlighted area in att
Crazy cut Stone cladding Installed for Boundary wall Outer face @ Between Elevation "B to C" @ Butterf
Skirting Slated layer of 4mm thk Modified Bitumenous Water proofing for Boundary wall (Inner Face)
Skirting Slated layer of 4mm thk Modified Bitumenous Water proofing for Boundary wall (Inner & Oute
Surface Preparation prior to Install Riyadh stone cladding for Boundary wall Outer Face @ Span 49A, 4
Coordinates & Top level of Footing of Boundary wall (Grid 11-20/Left Side) at Aviary Garden, As per Hig
Steel Reinforcement & Shuttering for Footing & Buttress of Boundary wall (Grid 11-20/Left Side) at Avi
Soil Preparation under Boulder No. RB-318
Soil Preperation under Boulder No. RB-320
Coordinates & Top level of Footing @ span 18 & 19 for boundary wall at Water Garden, as per Attached
Concrete Pouring & Shuttering for Footing @ span 18 & 19 for boundary wall at Water Garden, as per A
Concrete Pouring & Shuttering for Neck Column's 16 No's (1/A,B,D & E) (2/A,B,D & E) (3/A,B,C,D & E) (4
Steel Reinforcement for Neck Column's 16 No's (1/A,B,D & E) (2/A,B,D & E) (3/A,B,C,D & E) (4/B,C&D) a
Gravel 3/8 Bedding & Geotextile Surround for Sub-Surface Drain Branch Pipes (110 Dia) @ Grid 15-20/Al
Stone Cladding for Boundary wall @ Span 71, 72 & 73 (Outer Face) As per Attached Highlighted Drawing
Stone Cladding for Boundary wall @ Span 63, 64, 65 & 66A (Outer Face) As per Attached Highlighted Dr
Stone Cladding for Boundary wall Inner Face, @ Span 71, 72 & 73 As per Attached Highlighted Drawing's
Top level of S.O.G @ Grid 17-18/F-H, 17-19/O-S & Between 10-12/R-S (Excluding Electrical Room) as per
Concrete Pouring for S.O.G @ Grid 17-18/F-H, 17-19/O-S & Between 10-12/R-S (Excluding Electrical Roo
Steel Reinforcement for S.O.G @ Grid 17-18/F-H, 17-19/O-S & Between 10-12/R-S (Excluding Electrical
Excavation & Bed Preparation for Sub-Surface Drain Pipes (110 Dia) @ Zone 4 & 8, at Discovery Garden,
Gravel 3/8 Bedding & Geotextile Surround for Sub-Surface Drain Pipes (110 Dia) @ Zone 1, 4, 7 & 8, at
Gravel 3/8 Bedding & Geotextile Surround for Sub-Surface Drain Branch Pipes (110 Dia) @ Grid 1/C & 3/
Geo-Textile for Blinding under boundary wall @ Grid (10-1/left side) (Part 3) at Aviary Garden, As per
Protection Layer 4mm thk. Bituminous Protection Board (Both sides 500mm wide) for Blinding under boun
Single Layer Water proofing membrane 4mm thk. (Both sides 500mm wide) for Blinding under boundary w
Solvent Base Primer (Both sides 500mm wide) for Blinding prior to Water proofing membrane under bound
2nd Coat Cementitious Water Proofing for Blinding under boundary wall @ Grid (10-1/left side) (Part 3)
1st Coat Cementitious Water Proofing for Blinding under boundary wall @ Grid (10-1/left side) (Part 3)
Surface preparation of Blinding prior to Water proofing under boundary wall @ Grid (10-1/left side) (Pa
Installation of Rock and Boulder No. RB-294 (Full Boulder - 6 Layers)
"Inspection of Concrete Pouring for the Wall of Seating Area (1) at Zone-G (SA-10) As Highlighted"
Surface Preperation Prior to Start Grading at Zone-L ( Area -08) as highlighted
Installation of earthing clamps with conductor 70mm (5pcs.) for earthing reinforcement steel re-bar
Soil Preparation under Boulder No. RB-274
"Surface Preparation Prior to Start Backfilling (Grading) at Zone-B (Area -02) as highlighted"
Installation of earthing clamps with conductor 70mm (2pcs.) for earthing reinforcement steel re-bar
Crazy cut Stone cladding Installed for Boundary wall @ Part of "Elevation "B" (Outer face) @ Maze Gard
Steel Reinforcement & Shuttering for Footing @ span 18 & 19 for boundary wall at Water Garden, as p
Surface Preparation prior to Primer caot Damp proofing for Boundary wall Footings Inner Face @ Span 67
Concrete Pouring for Blinding for Boundary wall (Part-6, Grid 2-1/left side & 1-3/Right Side) at Aviary
"Inspection of Concrete Pouring for Walls and Top Slab of SBC-02 (Part-4) As Highlighted"
"Mock up inspection of Wall Stone Cladding for Prayer Area at Zone-B (As Highlighted) (Pattern-A, Patt
Excavation and Surface Preperation prior to start backfilling Sub-Base under Footing of Play Area - 03 -
Location, Level for Retaining wall (Top of Wall) at Axis AJ to AL - INNER
Level, Location of Promenade Bridge Column at Axis 01-N (as Highlighted)
Level, Location of Tunnel 1 Wall (as Highlighted) 2 outer wall
Surface Preparation Prior to Start Water proofing for Foundation (Outer) Exterior of Retaining wall (as
Application of Solvent Base Primer for Foundation (Outer) Exterior of Retaining wall (as highlighted) AX
Application of 1st and 2nd Layer 4mm Thick APP modified bituminous water proofing membrane reinforce
Application of Protection layer of 4mm thick bituminous protection board spot bonded for Foundation (O
Concreting for Column of Promenade Bridge axis 01-N
Formworks / Shutter for Column of Promenade Bridge axis 01-N
Coordinates & Top level of Wall of boundary wall @ (EXC4-43/44 to EXC4-51/52) at Physic Garden at hig
Steel Reinforcement for Column of Promenade Bridge axis 01-N
Coordinates & Top level of Wall of boundary wall @ (EXC1-04/05 to EXC3-01/10) at Physic Garden at hig
Concreting for Wall of Tunnel 1 (crescent) as highlighted 2 outer walls
Concrete Pouring & Shuttering for Wall of boundary wall @ (EXC4-43/44 to EXC4-51/52) at Physic Garde
Shuttering / Formworks for Wall of Tunnel 1 (crescent) as highlighted 2 outer walls
Concrete Pouring & Shuttering for Wall of boundary wall @ (EXC1-04/05 to EXC3-01/10) at Physic Garde
Steel Reinforcement for Wall of Tunnel 1 (crescent) as highlighted 2 outer walls
Steel Reinforcement for Wall of boundary wall @ (EXC1-04/05 to EXC3-01/10) at Physic Garden at highl
Existing level for boundary wall Base Prior to Remove Fill Material at Span 1, 2, 3 & 4 @ Water Garden a
Excavation & Bed Preparation for Sub-Surface Drain Branch Pipes (110 Dia) @ Grid 15-20/Along Periphera
Protection Board for Boundary Wall Span 40 & 41, Inner Face, At Highlighted in the attached drawing's
Backing Rod & Silicon Sealant of Expansion Joint @ Boundary Wall Span 40 & 41, Inner Face, As Highligh
Single Layer membrane water proofing at Retaining Wall Span 40 & 41, Inner Face, @ Boundary Wall, As
Excavation & Bed Preparation for Sub-Surface Drain Pipes (110 Dia) @ Zone 1 & 7, at Discovery Garden,
"Coordinates & Top level of Blinding concrete for Boundary wall (Part-5, Grid 1/Below & 1-3/Right Side
Excavation & Bed Preparation for Sub-Surface Drain Branch Pipes (110 Dia) @ Grid 1/C & 3/C-D, at Avia
Concrete Pouring for Footing & Buttress of Boundary wall (Part-1, Grid 20-23 of Left Side & Upside) at
Inspection of Formwork and Level Prior to Cast the Concrete for Walls and Top Slab of SBC-02 (Part-4) A
"Inspection of Concrete Pouring for the Wall of Seating Area (3) at Zone-K (SA-28) As Highlighted"
Level Location at Column in South Bridge (Axi 02/A1) Zone 7 2nd
Steel Reinforcement for Retaining Wall (KICKER) (as Highlighted at AXIS AJ)
Formworks / Shuttering for Retaining Wall (KICKER) (as Highlighted at AXIS AJ)
Concreting for Retaining Wall (KICKER) (as Highlighted at AXIS AJ)
Steel Reinforcement for Column of Bridge to South Tower (as Highlighted) in Axis 02/A1 2nd
Shuttering/Formworks for Column of Bridge to South Tower (as Highlighted) in Axis 02/A1 2nd
Concreting for Column of Bridge to South Tower (as Highlighted) in Axis 02/A1 2nd
Protection Board for Membrane for Retaining wall (Inner Face) @Span 49A, 49B & 50A, As per Attached
Stone Cladding for Boundary wall @ Span 61A & 61B (Inner Face) As per Attached Highlighted Drawing's
Stone Cladding for Boundary wall @ Span 59, 60A & 60B (Inner Face) As per Attached Highlighted Drawi
Stone Cladding for Boundary wall @ Span 66A, 66B, 67A & 67B (Inner Face) As per Attached Highlighte
Steel Reinforcement for Wall of boundary wall @ (EXC4-43/44 to EXC4-51/52 & EXC4-01/02 to EXC4-09/1
Concrete Pouring for Stiffner Column's, Lintels of Walls, Doors & Window's @ Grid 1-2/F-I & 3-5/E, as p
Installation of sub surface drainage perforated branches pipes (110mm Ø); as per high lighted in dwg
Inspection of 2nd Coat Damp Proofing at Boundary wall for Span 83 & 84, Inner side.
Installation of water feature Puddle Flange upvc class 5 (90 mm Ø); as per high lighted in dwg.
Concrete Pouring for Blinding for Boundary wall (Part-5, Grid 4-12 & 16-19 of Right Side) at Aviary Gard
Gravel 3/8 Bedding & Geotextile Surround for Sub Surface Main Line & Gravel Bedding & Geo Textilefor
Installation of pipes sleeve upvc class 4; as per high lighted in dwg.
Installation of chilled water pipes sleeve upvc class 4; as per high lighted in dwg.
Inspection of Surface Preperation for the Footing and Wall of Prayer Area at Zone-G, prior to start Wate
"Inspection of Concrete Pouring for the Wall of Seating Area (1) at Zone-G (SA-13) As Highlighted"
"Inspection of Formwork for the Wall of Seating Area (1) at Zone-G (SA-10) As Highlighted"
"Inspection of Formwork for the Wall of Seating Area (3) at Zone-K (SA-28) As Highlighted"
Installation of HVAC DUCT WORKS; as per high lighted in dwg
Concrete Pouring for blinding of boundary wall @ span 20 & 21 at Water Garden.
Coordinates & Top level of Kicker (2nd lift) of boundary wall @ (EXC4-43/44 to EXC4-51/52 & EXC4-01/0
Concrete pouring & Shuttering for Kicker (2nd lift) of boundary wall @ (EXC4-43/44 to EXC4-51/52 & E
Concrete Pouring for Stiffner Column's, Lintels of Doors & Walls @ Grid (between 3-4/R-V) (3-4/V) (4/R-
Steel Reinforcement and Shuttering for Stiffner Column's, Lintels of Doors & Walls @ Grid (between 3-4/
Inspection of Block Work upto Lintel Height at grid between 1-2/F-I, Between 3-4/R-X, Between 7-9/S-
"Coordinates & Top level of Blinding concrete for Boundary wall (Part-4, Grid 4-11 & 16-19 of Right Sid
Coordinates & Top level of Footing & Buttress of Boundary wall (Part-1) Grid 20-23 of Right Side & Upsi
"Inspection of Concrete Pouring for Foundation and Kicker of SBC-04 As Highlighted"
Installation of Rock and Boulder No. RB-325 (Full Boulder - 6 Layers)
Installation of PVC conduit (Dia.110mm F&S 2pcs.,Tel.-2pcs.) concrete encased ductbank (single laye
Installation of PVC conduit (Dia.160mm-4pcs.)concrete encased ductbank single layer for Power at th
Steel Reinforcement & Shuttering for Footing & Buttress of Boundary wall (Part-1, Grid 20-23 of Left Si
Concrete Pouring for Blinding for Boundary wall (Part-3, Grid 21-23 of Left Side) at Aviary Garden, As p
Surface Preparation Prior to Start Water proofing below Foundation Colonnadeds (dividing at Zone 2P) (
Solvent Base Primer Coating below Foundation Colonnadeds (dividing at Zone 2P) (as highlighted)
Inspection of Excavation for Cesspool-3
Single Layer of 4mm THK modified Bituminous waterproofing Membrane below Foundation Colonnadeds (
Protection Layer of Geo-textile sheet and Screed Protection 50mm thick below Foundation Colonnadeds (
"Inspection of Concrete Pouring for the Wall of Seating Area (3) at Zone-G (SA-23) As Highlighted"
Steel Reinforcement for Column of Promenade Bridge axis 01-O
Installation of earthing clamps with conductor 70mm (4pcs.) for earthing reinforcement steel re-bar
Formworks / Shutter for Column of Promenade Bridge axis 01-O
Concreting for Column of Promenade Bridge axis 01-O
Level, Location of Promenade Bridge Column at Axis 01-O (as Highlighted)
Surface Preperation Prior to Start Grading at Zone-L as highlighted
Installation of Rock and Boulder No. RB-294 (4th Layer)
Concrete Pouring for Column of Bridge to South Tower (as Highlighted) in Axis 02/B1 2ndConcrete Pou
Installation of Rock and Boulder No. RB-325 (4th Layer)
Formworks / Shuttering for Column of Bridge to South Tower (as Highlighted) in Axis 02/B1 2nd
Steel Reinforcement for Column of Bridge to South Tower (as Highlighted) in Axis 02/B1 2nd
Level, Location of Column in South Bridge (Axis 02/B1) Zone 7
Steel Reinforcement for Foundation of Tunnel 1 Near MCPE (crescent) as highlighted
Shutter Formworks for Foundation of Tunnel 1 Near MCPE (crescent) as highlighted
Concreting for Foundation of Tunnel 1 Near MCPE (crescent) as highlighted
Level, Location of Tunnel 1 Foundation Near MCPE (as Highlighted)
Level, Location of Tunnel 1 Wall (as Highlighted)
Concreting for Wall of Tunnel 1 (crescent) as highlighted
Installation of PVC conduit (Dia.110mm F&S 2pcs. Single layer,Tel.-4pcs. 2 layers) concrete encased
Injection of the Epoxy for Cracks (Crack No's - 6, 9, 10, 11, 12, 14, 16, 23, 24, 27 & 28) of Boundary wa
Concrete Pouring for blinding of boundary wall @ span 18 & 19 at Water Garden.
Injection of the Epoxy for Cracks (Crack No's - 8, 12, 16 & 17) of Boundary wall at Butterfly Garden, Tot
Coordinates & Top level of Wall of boundary wall @ (EXC1-12/13 to EXC3-11/20) at Physic Garden at hig
Coordinates & Top level of Kicker (1st lift) of boundary wall @ (EXC4-43/44 to EXC4-51/52 & EXC4-01/0
Concrete pouring & Shuttering for Wall of boundary wall @ (EXC1-12/13 to EXC3-11/20) at Physic Garde
Concrete pouring & Shuttering for Kicker (1st lift) of boundary wall @ (EXC4-43/44 to EXC4-51/52 & EX
Steel Reinforcement for Kicker of boundary wall @ (EXC4-43/44 to EXC4-51/52 & EXC4-01/02 to EXC4-09
Concrete pouring for Footing of boundary wall @ (EXC4-43/44 to EXC4-51/52 & EXC4-01/02 to EXC4-09/1
Steel Reinforcement and Shuttering for Stiffner Column's, Lintels of Walls, Doors & Window's @ Grid 1-2
Injection of the Epoxy for Cracks (Crack No's - 2, 4, 5, 10, 11, 13, 16 & 17) of Boundary wall at Discover
Concrete Pouring for Blinding of Boundary wall (Part-4, Grid 3-9 of Left Side) at Aviary Garden, As per H
"Mock up inspection of Wall Stone Cladding for Prayer Area at Zone-B (As Highlighted) (Pattern-1, Patte
"Inspection of Formwork for the Wall of Seating Area (3) at Zone-G (SA-23) As Highlighted"
Inspection of Concrete Pouring for the Foundation of Seating Area (3) at Zone-G&K (SA-24,25) As Highli
Surface Preperation prior to start backfilling for Prayer Area at Zone-B (External Area) - As Highlighted
Inspection for application of Cementitious water Proofing (3rd Coat) at Prayer Area Zone-K (outside) - a
Excavation &Surface Preparation Prior to Start Backfilling (Grading) at Zone-B as highlighted
Installation of PVC conduit (Dia.25mm straight-2 pcs. Each Speaker) and Weatherproof Box (1pc. Each
Installation of PVC conduit (straight Dia.25mm - 2 pcs. Each WIFI) and Weatherproof Box (1pc. Each
Installation of PVC conduit (Dia.25mm straight-2 pcs. Each CAM) and Weatherproof Box (1pc. Each CA
Installation of drainage pipes (Cast Iron & UPVC)size: 110, 75, 50 mm; as per high lighted in dwg.
Installation of rain water drainage pipes (upvc class 4) as per high lighted in dwg.
Installation of stub-up PVC conduit (Dia.25mm stub-up-2 pcs. Each Speaker) for Fire Alarm at the Ph
Installation of stub-up PVC conduit Dia.25mm - 2 pcs. Each WIFI for Video and Data at the Physic Ga
Installation of PVC conduit (Dia.25mm stub-up-2 pcs. Each CAM) for Security System at the Physic G
Application of Protection Layer of 4mm thick bituminous protection Board, Spot Bonded for Foundation (
Application of Protection Layer of 4mm thick bituminous protection Board, Spot Bonded for Foundation (
Surface Preparation Prior to Start Backfilling Between PC # 101 to 99 (crescent Zone 7) as highlighted
Coordinates & Top level of blinding concrete for boundary wall @ span 18, 19, 20 & 21 at Water Garden
Excavation & Surface Preparation for foundation of boundary wall @ span 18, 19, 20 & 21 with Levels
Surface Preparation Prior to start backfilling In between PC 100 to 102 (as Highlighted)
Surface Preparation Prior to start backfilling In between TIP to PC 200 & 199 (as Highlighted)
"Coordinates & Top level of Blinding concrete for Boundary wall (Part-4, Grid 2-9 of Left Side) at Aviar
"Inspection of Formwork and Level for Foundation and Kicker of SBC-04 As Highlighted"
Installation of Rock and Boulder No. RB-325 (3rd Layer)
"Inspection of Formwork for the Foundation of Seating Area (3) at Zone-G&K (SA-24,25) As Highlighted"
Inspection of Steel Reinforcement for the Foundation and Wall of Seating Area (3) at Zone-G&K (SA-24,
"Inspection of Formwork for the Wall of Seating Area (1) at Zone-G (SA-13) As Highlighted"
Inspection for application of Cementitious water Proofing (2nd Coat) at Prayer Area Zone-K (outside) - a
Inspection for application of Cementitious water Proofing (1st Coat) at Prayer Area Zone-K (outside) - a
Installation of straight PVC Conduit (32mm) for Power (Socket Outlet) at Physic Garden Boundary Wal
Installation of earthing clamps with conductor 70mm (1pc.) for earthing reinforcement steel re-bar
Crazy cut Stone cladding Installed for Boundary wall @ Part of "Elevation "C" (Outer face) @ Maze Gard
Coordinates & Top level of Footing of boundary wall @ (EXC4-43/44 to EXC4-51/52 & EXC4-01/02 to EXC
Steel Reinforcement for Wall of boundary wall @ (EXC1-12/13 to EXC3-11/20) at Physic Garden at highl
Steel Reinforcement & Shuttering for Footing of boundary wall @ (EXC4-43/44 to EXC4-51/52 & EXC4-01
Excavation & Bed Preparation for Sub-Surface Main Pipes 160mm & 110mm Branch Pipes at Aviary Garden
Installation of Rock and Boulder No. RB-302 (Full Boulder - 4 Layers)
Pipe Installation of sub-surface drainage main line 250 & 160mmØ & branches line perforated pipes
Second coat Damp proofing for Boundary wall (Inner Face) @ Span 85, 86, 87, 88 & 89 As per Attached
First Coat Damp proofing prior to Second coat for Boundary wall (Inner Face) @ Span 85, 86, 87, 88 & 8
Second coat Damp proofing for Boundary wall (Inner Face) @ Span 76 & 77 As per Attached Highlighted
Level and Location for Excavation under Dividing wall Foundation Zone 2P as highlighted
Surface Preparation Prior to start backfilling In between inner and outer retaining wall Axis AV to AR (as
Concreting for Retaining Wall (WALL) (as Highlighted at AXIS AJ TO AL)
First Coat Damp proofing prior to Second coat for Boundary wall (Inner Face) @ Span 76 & 77 As per At
Shutter Formworks for Retaining Wall (WALL) (as Highlighted at AXIS AJ TO AL)
Steel Reinforcement for Retaining Wall (WALL) (as Highlighted at AXIS AJ TO AL)
Primer Coat Damp proofing prior to 1st coat for Boundary wall (Inner Face) @ Span 76 & 77 As per Atta
"Inspection of Steel Reinforcement for the Top Slab of SBC-02 (Part-4) As Highlighted"
Installation of Rock and Boulder No. RB-302 (3rd Layer)
"Inspection of Formwork for the Foundation of Seating Area (1) at Zone-G (SA-13 ) As Highlighted"
Installation of PVC conduit (Dia.110mm F&S 2pcs. Single layer,Tel.-4pcs. 2 layers) concrete encased
Installation of PVC conduit (Dia.160mm-10pcs.)concrete encased ductbank 2 layers for Power at the
Pipe Installation of sub-surface drainage main line 315, 160mmØ, &110mmØ ; as per high lighted a
Inspection of Backfilling for Around and Above the SBC-03 - As Highlighted
Reinforcement Inspection for Foundation and Walls of SBC-04
Inspection of Steel Reinforcement for the Foundation and Wall of Seating Area (1) at Zone-G (SA-13 ) As
Inspection of Concrete Pouring for the Foundation of Seating Area (2) at Zone-K (SA-29 & 30) As Highlig
"Inspection of Concrete Pouring for the Wall of Seating Area (1) at Zone-G (SA-11 ) As Highlighted"
"Inspection of Concrete Pouring for the Foundation of Seating Area (3) at Zone-K (SA-28) As Highlighted
"Inspection of Concrete Pouring for the Wall of Seating Area (3) at Zone-G (SA-22) As Highlighted"
Inspection of shuttering, reinforcement and concrete pouring (33 units foundation- only precast) for
Inspection for Shuttering, Reinforcement Anchor Bolts & Concrete Pouring for Raft Foundation Projec
Boundary Wall Stone Mock-up (Inner & Outer Wall Surface & Column).
Coordinates & Top level of Wall @ span 17 for boundary wall at Water Garden, as per Attached Drawing
Concrete Pouring & Shuttering for Wall @ span 17 of boundary wall at Water Garden, as per Attached D
Notification to Start Removal of old crescent monument & Soil Material Behind Boundary wall Span 38 t
"Stone Cladding for Boundary wall @ Span 67C, 68A & 68B (Inner Face), As per Attached Highlighted Dra
Concrete Pouring for Stiffner Column's, Lintels of Walls, Doors & Window's @ Grid 10-15/F, 13/F-H, 13
Geo-Textile for Blinding under boundary wall @ (Part 1 & 2) at Aviary Garden at highlighted area in att
Protection Layer 4mm thk. Bituminous Protection Board (Both sides 500mm wide) for Blinding under bo
Single Layer Water proofing membrane 4mm thk. (Both sides 500mm wide) for Blinding under boundary
Solvent Base Primer (Both sides 500mm wide) for Blinding prior to Water proofing membrane under boun
2nd Coat Cementitious Water Proofing for Blinding prior to Water proofing under boundary wall @ (Part
1st Coat Cementitious Water Proofing for Blinding prior to Water proofing under boundary wall @ (Part
Surface preparation of Blinding prior to Water proofing under boundary wall @ (Part 1 & 2) at Aviary G
Concrete Pouring for Blinding for Boundary wall (Part-2, Grid 8-23 of Left Side) at Aviary Garden, As per
Installation of Rock and Boulder No. RB-302 (2nd Layer)
"Inspection of Formwork for the Foundation of Seating Area (2) at Zone-K (SA-29 & 30) As Highlighted"
Inspection of Steel Reinforcement for the Foundation and Wall of Seating Area (2) at Zone-K (SA-29 & 3
"Inspection of Formwork for the Wall of Seating Area (1) at Zone-G (SA-11 ) As Highlighted"
Inspection for application of Cementitious water Proofing (3rd Coat) at Prayer Area Zone-K (as Highlight
Surface Preperation Prior to Start Grading at Zone-L as highlighted
Steel Reinforcement for Column of Bridge to South Tower (as Highlighted) in Axis 02/C1 - 2nd stage
Concrete Pouring for Column of Bridge to South Tower (as Highlighted) in Axis 02/C1 - 2nd stage
Anti Termite Under Blinding of foundation for Dividing (zone 2P) as highlighted 9 foundations
Blinding/Plain Concrete Under foundation for Dividing (zone 2P) as highlighted 9 foundations
Steel Reinforcement for Retaining Wall (WALL) (as Highlighted at AXIS AN TO AP)
Shutter Formworks for Retaining Wall (WALL) (as Highlighted at AXIS AN TO AP)
Concreting for Retaining Wall (WALL) (as Highlighted at AXIS AN TO AP)
Blinding Level and Location under foundation for Dividing (zone 2P) as highlighted 9 foundations
Location, Level for Retaining wall (Top of Wall) at Axis AN to AP - INNER
Level, Location of Column in South Bridge (Axis 02/C1) Zone 7 2nd stage
Application of Protection layer of 4mm thick bituminous protection board, spot moulded for Foundatio
Application of 1st and 2nd layer 4mm thick APP modified Bituminous Water proofing membrane reinforc
Application of Solvent Base Primer for Foundation (Inner and Outer) of Retaining wall (as highlighted)
Surface Preparation Prior to Start Water proofing for Foundation (Inner and Outer) of Retaining wall (
Notification to start excavation for Dividing (zone 2P) as highlighted 9 foundations
Surface Preparation Prior to start backfilling at South Small Mosque (as Highlighted)
Surface Preparation Prior to start backfilling between PC 101 to 103 (as Highlighted)
Inspection for application of Protection Layer 4mm Thick Bituminious Protection Board on top of Bitum
Inspection for application of Bituminous Damp Proofing (2nd Coat) on top of Primer at Prayer Area Zone
Inspection for application of Bituminous Damp Proofing (1st Coat) on top of Primer at Prayer Area Zone-
Inspection for application of Cementitious water Proofing (2nd Coat) at Prayer Area Zone-K (as Highligh
Inspection for application of Primer (50%x50% Bitumin & Water) on Foundation and 1st Part of wall at
Installation of Rock and Boulder No. RB-325 (2nd Layer)
Soil Preparation under Boulder No. RB-278
Existing level for boundary wall Base After Removing Fill Material @ Water Garden at highlighted area i
"Coordinates & Top level of Blinding concrete for Boundary wall (Part-2, Grid 8-23 of Left Side) at Avi
Pipe Installation of sub-surface drainage main line 110 & 160mmØ & branches line perforated pipes;
Pipe Installation of sub-surface drainage main line 250 & 160mmØ & branches line perforated pipes;
Notification to start Backfilling Over the Two Existing Culvert (As Highlighted)
Surface Preperation prior to start backfilling at Zone-E - As Highlighted
Installation of Rock and Boulder No. RB-302 (1st Layer)
Installation of Rock and Boulder No. RB-310 (Full Boulder - 5 Layers)
Soil Preparation Before Filling & Grading @ Maze Garden at highlighted area in attached drawing's.
Notification to Start removing the Asphalt as per the attached marked area to match the approved site
Application of Two layer of 4mm thick modified bituminous water proofing membrane at foundation and
Application of Protection layer of 4mm thick Bituminous Protection board at wall of Tunnel Zone 5 (as H
Application of Protection layer of Geotextile sheet and 50mm thick screed at foundation of Tunnel Zo
Coordinates & Top level of Retaining wall @ Jetty 1 at Boat Garden at highlighted area in attached Drawi
Protection Board for Pedestal (Column's) Surround 05 no's @ Grids B / 4, 5, 6, 7 & 8 @Ticket booths Ca
Gravel 3/8 Bedding & Geotextile Surround for Sub-Surface Main Pipes 250mm & Gravel 3/8 Bedding & G
Geo-Textile for Blinding under boundary wall @ (EXC4-43/44 to 51/52 & EXC4-01/02 to 09/10) at Physic
Protection Layer 4mm thk. Bituminous Protection Board (Both sides 500mm wide) for Blinding under b
Single Layer Water proofing membrane 4mm thk. (Both sides 500mm wide) for Blinding under boundary
Solvent Base Primer (Both sides 500mm wide) for Blinding prior to Water proofing membrane under bo
2nd Coat Cementitious Water Proofing for Blinding under boundary wall @ (EXC4-43/44 to 51/52 & EXC4
1st Coat Cementitious Water Proofing for Blinding under boundary wall @ (EXC4-43/44 to 51/52 & EXC4
Surface preparation of Blinding prior to Water proofing under boundary wall @ (EXC4-43/44 to 51/52 &
Concrete Pouring for Lintels of Walls, Doors & Window's @Grid 6/F-J, 6/M-R & 6-7/Q, as per highlighted
Steel Reinforcement and Shuttering for Lintels of Walls, Doors & Window's @ Grid 6/F-J, 6/M-R & 6-7/Q,
Steel Reinforcement and Shuttering for Lintels of Walls, Doors & Window's @ Grid 10-15/F, 15/F-Q, 11
Inspection of Backfilling for Around and Above the SBC-03 - As Highlighted
Installation of Rock and Boulder No. RB-243 (Full Boulder - 5 Layers)
Installation of Rock and Boulder No. RB-310 (3rd Layer)
Surface Preperation Prior to Start Grading at Zone-L as highlighted
Coordinates & Top level of Wall @ (EXC4-29/30 to EXC4-41/42) of boundary wall at Physic Garden at hi
Coordinates & Top level of Kicker (final Level) for boundary wall @ (EXC1-04/05 to EXC3-01/10 & EXC1-
Concrete pouring & Shuttering for Wall @ (EXC4-29/30 to EXC4-41/42) of boundary wall at Physic Garde
"Coordinates & Top level of Blinding concrete for Boundary wall (Part-1) at Aviary Garden, As per atta
"Concrete Pouring for Blinding concrete for Boundary wall (Part-1) at Aviary Garden, As per attached H
"Inspection of Formwork for the Foundation of Seating Area (3) at Zone-K (SA-28) As Highlighted"
"Inspection of Formwork for the Wall of Seating Area (3) at Zone-G (SA-22) As Highlighted"
Surface Preperation prior to start backfilling for Prayer Area at Zone-B (Internal Area) - As Highlighted
Geotextile sheet 180 gr. per sq.m and screed above foundation (Inner and Outer) of Retaining Wall at
Protection layer of 4mm thick Bituminuos Protection Board, spotted bonded for above Foundation and
1st and 2nd Layer 4mm thick, APP modified Bituminous Waterproofing Membrane, Reinforced with Polys
Solvent Base Primer Coating for above Foundation and Wall (Inner and Outer) of Retaining Wall at Axi
Surface Preparation prior to start Waterproofing for above Foundation and Wall (Inner and Outer) of R
Shuttering / Formworks for Wall of Tunnel 1 (Crescent) as highlighted.
Steel Reinforcement for Wall of Tunnel 1 (Crescent) aas highlighted.
Surface Preparation prior to Water proofing for Boundary wall Inner Face @ Span 79, 80, 81, 82, 83, 84
"Stone Cladding for Boundary wall @ Span 67C, 68A & 68B (Inner Face), As per Attached Highlighted Dra
Concrete Pouring for Blinding of boundary wall @ (EXC4-43/44 to EXC4-51/52 & EXC4-01/02 to EXC4-09/
Gravel 3/8 Bedding & Geotextile Surround for Sub-Surface Drainage main Line (315mm) at Discovery Ga
Final Coat cementitious water proofing for Boundary wall (Inner face) @ Elevation "B & E" @ Discovery
Second Coat cementitious water proofing Prior to apply Final Coat for Boundary wall (Inner face) @ El
First Coat cementitious water proofing Prior to apply Second Coat for Boundary wall (Inner face) @ El
Inspection of Existing levels after Excavation & Removing loose soil @ Boundary wall (Part-2) at Aviar
"Gravel 3/8 Bedding & Geotextile Surround for Sub Surface Main Line & Gravel Bedding & Geo Textile fo
"Mock up inspection of Wall Stone Cladding for Prayer Area at Zone-B (As Highlighted) (Pattern-1, Patte
Inspection of Concrete Pouring for the 2nd part of Wall for Prayer Area at Zone-G (as Highlighted)
Installation of PVC conduit (WIFI- dia. 25mm stub-up &straight-1pc., E-Ticket dia. 32mm stub-up-1pc
Installation of PVC conduit (WIFI- dia. 25mm stub-up &straight-1pc., E-Ticket dia. 32mm stub-up-1pc.
Surface Preparation Prior to Start Water proofing under PC 105 to 110 (as Highlighted)
Solvent Base Primer Coating under PC 105 to 110 (as Highlighted)
Protection Layer of Geotextile sheet and 30mm Screed under PC 105 to 110 (as Highlighted)
Single Layer of 4mm thick modified bituminous water proofing membrane under PC 105 to 110 (as High
Protection Layer of 4mm thick bituminous protection board under PC 105 to 110 (as Highlighted)
Inspection of Fixing Points Prior to Inject the Epoxy for Cracks (Crack No's - 6, 9, 10, 11, 12, 14, 16,
Inspection of Fixing Points Prior to Inject the Epoxy for Cracks (Crack No's - 8, 12, 16 & 17) of Boundar
Inspection of Fixing Points Prior to Inject the Epoxy for Cracks (Crack No's - 2, 4, 5, 10, 11, 13, 16 & 1
Concrete Pouring for Lintels of Walls, Doors & Stiffner Column's @ Grid between 4-7/Q-X as per highlig
Steel Reinforcement and Shuttering for Lintels of Walls, Doors & Stiffner Column's @ Grid between 4-7/
Inspection of Concrete Pouring for walls and Top Slab of SBC-02 (Part-1) As Highlighted
Installation of Rock and Boulder No. RB-246 (Full Boulder - 5 Layers)
Installation of Rock and Boulder No. RB-310 (2nd Layer)
Installation of Rock and Boulder No. RB-285 (5th Layer)
Inspection for application of Cementitious water Proofing (1st Coat) at Prayer Area Zone-K (as Highlight
Second Coat Damp proofing for Kicker Extension of Boundary Wall Inner Face at Elevation "E & B" @
First Coat Damp proofing prior to apply Second coat for Kicker Extension of Boundary Wall Inner Face
Primer Coat Damp proofing prior to apply First coat for Kicker Extension of Boundary wall Inner Face
Installation of PVC conduit (straight Dia.25mm -1 pcs. each CAM) and Weatherproof Box (1pc each CA
Installation of PVC conduit (stub-up & straight Dia.25mm -1 pc. each CAM & 25mm Dia. 1 pc. each
Installation of PVC conduit (straight Dia.25mm-1pc. each speaker) and Weatherproof Box (1pc. each s
Installation of PVC conduit dia. 32mm -1pc. (stub-up&straight) at the Water Garden Zone 4A per att
Installation of earthing clamps with conductor 70mm (2pcs.) for earthing reinforcement steel re-bar
Installation of straight PVC Conduit (30mm) for Power (E-ticket & Gen. Socket) at Water Garden Bou
Coordinates & Top level of Wall @ span 15 & 16 for boundary wall at Water Garden, as per Attached Dr
Concrete Pouring & Shuttering for Retaining Wall @ Jetty # 1 at Boat Garden at highlighted area in atta
Concrete Pouring & Shuttering for Wall @ span 15 & 16 of boundary wall at Water Garden, as per Atta
Riyadh Stone Cladding for Boundary wall Outer Face @ Span 59, 60A & 60B As per Attached Highlighted
Application of Protection Layer of 4mm thick bituminous protection Board, Spot Bonded for Foundation (
Application of 1st and 2nd layer 4mm thick APP modified bituminous water proofing membrane reinforce
Inspection for Formwork and Level Prior to Cast the Concrete for walls and Top Slab of SBC-02 (Part-1)
Surface Preperation prior to start backfilling at Zone-E - As Highlighted
Installation of Rock and Boulder No. RB-243 (4th Layer)
Installation of Rock and Boulder No. RB-285 (4th Layer)
"Inspection of Concrete Pouring for the Wall of Seating Area (3) at Zone-G (SA-20) As Highlighted"
Inspection of Concrete Pouring for the Foundation of Seating Area (2) at Zone-K (SA-28 & 32 ) As Highli
Soil Preperation under Boulder No. RB-151
Surface Preperation Prior to Start Grading at Zone-L as highlighted
Probing and Grouting works at Zone 1, MCPE-04 (new)(95 points)
Probing and Grouting works at Zone 1, MCPE-04 (new)(95 points)
Surface Preparation Prior to Start Water proofing for Foundation (Inner and Outer) of Retaining wall (as
Application of Solvent Base Primer Coating for Foundation (Inner and Outer) of Retaining wall (as highli
Application of 1st and 2nd layer 4mm thick APP modified bituminous water proofing membrane reinforce
Application of Protection Layer of 4mm thick bituminous protection Board, Spot Bonded for Foundation (
Surface Preparation Prior to Start Backfilling Zone 2R (crescent Zone 2) as highlighted
Excavation and Surface Preparation Prior to Backfilling For FW- Force Line at Zone 5A (as Highlighted fr
Concrete Pouring for S.O.G inside @ Ticket Booths # 07, As per the attached drawing.
Coordinates & Top level of Blinding for boundary wall @ (EXC4-43/44 to EXC4-51/52 & EXC4-01/02 to EX
Coordinates & level of Excavation for boundary wall @ (EXC4-43/44 to EXC4-51/52 & EXC4-01/02 to EXC
Concrete Pouring for Stiffner Column's, Lintels of Walls & Doors @ Grid between 9-10/N-Q as per highli
Steel Reinforcement and Shuttering for Stiffner Column's, Lintels of Walls & Doors @ Grid between 9-1
Excavation & Bed Preparation for Sub-Surface Main Pipes 160mm & 110mm Branch Pipes at Aviary Garden
Applied Wall Putty for external elevation Prior to Apply Paint for Ticket booth # 3, As per attached Draw
Bed Preperation prior to start backfilling under foundation of Cesspool - 2
Inspection for Casting the Blinding Concrete under the Footing of Seating Area (2) at Zone-L (SA-37 ) As
"Inspection of Formwork for the Foundation of Seating Area (2) at Zone-K (SA-32) As Highlighted"
Inspection of Steel Reinforcement for the Foundation and Wall of Seating Area (2) at Zone-K (SA-32) As
Inspection of form work and level for the 2nd part of Wall for Prayer Area at Zone-G (as Highlighted)
Backfill Grading at Zone L- As Highlighted
Inspection of Sand Backfilling Over Pipe Line Foul Water (Class 5- Ø315M) from ( CH- 21 to CH- 22)
Inspection for installation of Warnning Tape for Foul Water (Class 5- Ø315M) from ( CH- 21 to CH-
Installation of PVC conduit (WIFI- dia. 25mm stub-up &straight-2pcs., E-Ticket dia. 32mm stub-up-2p
Concrete pouring for Stiffner Column's (From Lintels Top to bottom of roof beam) @ Grid 20/F-Q, 3-9/X,
"Steel Reinforcement and Shuttering for Stiffner Column's (From Lintels Top to bottom of roof beam) @
Notification Prior to Start Surface Preparation on External Elevation Walls for Plastering (Including
Surface Preparation for New Kicker Extension for Boundary wall Inner Face at Discovery Garden, At high
Inspection of Existing levels after Excavation & Removing loose soil @ Boundary wall at Aviary Garden,
"Gravel 3/8 Bedding & Geotextile Surround for Sub Surface Main Line & Gravel Bedding & Geo Textile fo
Installation of Rock and Boulder No. RB-167 (11&12 Layers)
Installation of Rock and Boulder No. RB-139 (12 &13 Layers)
Installation of Rock and Boulder No. RB-166 (Layer # 3,4,5,6,7)
Installation of Rock and Boulder No. RB-142 (5th Layer)
Installation of Rock and Boulder No. RB-143 (Layer # 1)
Surface Preparation prior to start Water Proofing Membrane at Foundation and wall of Tunnel Zone 5 (a
Application of Solvent Base Primer Coating at foundation and wall of Tunnel Zone 5 (as Highlighted)
Formworks / Shuttering for Column of Bridge to South Tower (as Highlighted) in Axis 02/C1
Steel Reinforcement for Column of Bridge to South Tower (as Highlighted) in Axis 02/C1
Concrete Pouring for Column of Bridge to South Tower (as Highlighted) in Axis 02/B1
Level, Location of Column in South Bridge (Axis 02/C1) Zone 7
Surface Preperation prior to start backfilling at Zone-E - As Highlighted
Installation of Rock and Boulder No. RB-294 (3rd Layer)
Installation of Rock and Boulder No. RB-243 (3rd Layer)
Installation of Rock and Boulder No. RB-303 (Full Boulder - 6 Layers)
"Inspection of Formwork for the Wall of Seating Area (3) at Zone-G (SA-20) As Highlighted"
Inspection for casting the Blinding Concrete under Footing of Seating Area (3) at Zone-G (SA-19) - As Hi
Pipe Installation of sub-surface drainage branches line perforated pipes; 110mmØ (L=60.7 M & 3 M) ;
Installation of PVC conduit (WIFI- dia. 25mm stub-up &straight-2pcs., E-Ticket dia. 32mm stub-up-2p
Steel Reinforcement for Wall @ span 15, 16 & 17 for boundary wall at Water Garden, as per Attached D
Excavation & Bed Preparation for Sub-Surface Main Pipes 250mm & 110mm Branch Pipes @ Sound & light
Coordinates & Top level of Kicker for boundary wall @ (EXC1-04/05 to EXC3-01/10 & EXC1-12/13 to EXC3
Concrete Pouring & Shuttering of Kicker for boundary wall @ (EXC1-04/05 to EXC3-01/10 & EXC1-12/13
Probing and Grouting works at Zone 1, MCPE-04 (new)(48 points)
Probing and Grouting works at Zone 1, MCPE-04 (new)(48 points)
Rock Level 13 meters offset from retaining wall center line between axis K and Axis Y (zone 2, 3, 4)
Shuttering/Formworks for Column of Bridge to South Tower (as Highlighted) in Axis 02/A
Surface Preparation Prior to Start Backfilling at Zone L- As Highligh
Surface Preperation prior to start backfilling at Zone-E - As Highlighted
Installation of Rock and Boulder No. RB-166 (Layer # 7 & 8)
"Inspection of Formwork for the Foundation of Seating Area (2) at Zone-K (SA-28) As Highlighted"
Inspection of Steel Reinforcement for the Foundation and Wall of Seating Area (2) at Zone-K (SA-28 ) As
Installation of Rock and Boulder No. RB-317 (5th Layer)
Installation of Rock and Boulder No. RB-167 (Top Layer)
Concrete pouring & Shuttering for Footing of boundary wall @ (EXC1-04/05 to EXC3-01/10 & EXC1-12/13
Inspection of Crazy cut Stone cladding Installed for Boundary wall @ "Elevation "B" & Part of "A" (Out
Concrete pouring & Shuttering for Kicker (2nd Lift) of boundary wall @ span 17 at Water Garden, as pe
Concrete Pouring & Shuttering for Neck Column's 11 No's (2/B,C & D) (3/4,C,D & E) (4/B,C,D,E) @ Jetty
Stone Cladding Installed for Boundary wall Outer Face @ Span 26, 27 & 28 As per Attached Highlighted
Concrete Pouring for Kicker Extension at Boundary wall @ Elevation "E & B" (Inner Face) @ Discovery Ga
Inspection of Excavation for Cesspool-2
Coordinates & Top level of Neck Column's 16 No's (1/A,B,D & E) (2/A,B,D & E) (3/A,B,C,D & E) (4/B,C&D
1st Layer of Stack boulders wall Installed @ Water Play Garden, At highlighted area in attached drawing
Single Layer Membrane water proofing for Expansion Joint with Backing Rod & Silicon Sealant for Reta
Stone Cladding for Boundary wall Inner Face @ Span 56, 57 & 58 As per Attached Highlighted Drawing's.
Excavation & Bed Preparation for Sub-Surface Drainage main Pipes at Discovery Garden, At highlighted
Steel Reinforcement & Shuttering for Kicker Extension at Boundary wall @ Elevation "E & B" (Inner Face
Excavation & Bed Preparation for Sub-Surface Main Pipes 250mm, 160mm & 110mm Branch Pipes at Avia
Pipe Installation of sub-surface drainage main line pipes; 250mmØ & 110mmØ (L=19.2 M & 4 M) ; as
Pipe Installation of sub-surface drainage main line pipes; 315mmØ; ( L= 19m); as per high lighted a
Level, Location of Tunnel 1 Foundation (as Highlighted)
Application of Two layer of 4mm thick modified bituminous waterproofing membrane 200 gr. Per sq.m.
Application of Protection Layer of 4mm thick Bituminous Protection Board on wall of Tunnel Zone 5 (as
Application of Protection Layer of Geotextile sheet 180 gr. Per sq.m and Screed of Tunnel Zone 5 (as Hig
Inspection of Steel Reinforcement for the Side Walls and Top Slab of SBC-02 (Part-1) As Highlighted
Installation of Rock and Boulder No. RB-323 (Full Boulder - 6 Layers)
Installation of Rock and Boulder No. RB-303 (4th & 5th Layer)
Inspection for Casting the Blinding Concrete under foundation of SBC - 04, for the extended area - as
Inspection for application of Cementitious water Proofing (3rd Coat) at Prayer Area Zone-B (as Highlight
Inspection for application of Cementitious water Proofing (2nd Coat) at Prayer Area Zone-B (as Highligh
Installation of earthing clamps with conductor 70mm (1pc.) for earthing reinforcement steel re-bar
Installation of stub-up PVC conduit (Dia.32mm - 3pcs. each CAM &WFI , 2pcs-Power Socket) for Powe
Installation of stub-up PVC conduit (Dia.32mm -3 pcs. each CAM & WIFI) for Voice and Data at the P
Installation of stub-up PVC conduit (Dia.32mm -3 pcs. each CAM) for CCTV System at the Physic Gar
Installation of stub-up PVC conduit (Dia.25mm 8pcs.) for Fire Alarm System (Speaker) at the Physic
Application of Protection Layer of 4mm thick bituminous protection board for Pile Cap 100 & 102
Application of Single Layer of 4mm thick Modified Bituminous water proofing Membrane, 200gr per sq.
Application of Solvent Base Primer coating for Pile Cap 100 & 102
Surface Preparation Prior to Start Water proofing for Pile Cap 100 & 102
Concrete Pouring for Column of Bridge to South Tower (as Highlighted) in Axis 02/B1
Steel Reinforcement for Column of Bridge to South Tower (as Highlighted) in Axis 02/B1
Formworks / Shuttering for Column of Bridge to South Tower (as Highlighted) in Axis 02/B1
Probing and Grouting works at Zone 1, MCPE-04 (new)(53 points)
Level, Location of Column in South Bridge (Axis 02/B1) Zone 7
Probing and Grouting works at Zone 1, MCPE-04 (new)(53 points)
Coordinates & Top level of Retaining wall @ Jetty 1 at Boat Garden at highlighted area in attached Drawi
Coordinates & Top level of Wall @ span 14 for boundary wall at Water Garden, as per Attached Drawing
Steel Reinforcement for Neck Column's 16 No's (1/A,B,D & E) (2/A,B,D & E) (3/A,B,C,D & E) (4/B,C&D) a
Concrete Pouring & Shuttering for Wall @ span 14 for boundary wall at Water Garden, as per Attached
Steel Reinforcement for Wall @ span 14 for boundary wall at Water Garden, as per Attached Drawings.
Steel Reinforcement for Neck Column's 11 No's (2/B,C & D) (3/4,C,D & E) (4/B,C,D,E) and Wall @ Jetty
Final Coat Cementitious Water proofing for Boundary wall Outer Face @ Butterfly Garden As per Attach
Riyadh Stone Cladding for Boundary wall Outer Face @ Span 61A & 61B As per Attached Highlighted Dra
Stone Cladding for Boundary wall Outer Face @ Span 56, 57 & 58 As per Attached Highlighted Drawing's
Inspection of First layer Block layout at grid between 8-9/F-H & 19/Q-S'T, as highlighted in attached
Gravel Bedding & Geo Textile for Sub-Surface Branch Pipes 110mm, at Aviary Garden, At highlighted are
Inspection of Concrete Pouring for the Foundation of Seating Area (1) at Zone-G (SA-10, 11, 12, 13 ) As
"Inspection of Formwork for the Foundation of Seating Area (1) at Zone-G (SA-10 ) As Highlighted"
Inspection of Surface Preperation for the Footing and Wall of Prayer Area at Zone-K, prior to start Wate
"Inspection of Concrete Pouring for the Foundation of Seating Area (3) at Zone-G (SA-23) As Highlighted
Inspection of Steel Reinforcement for the Foundation and Wall of Seating Area (3) at Zone-G (SA-23 ) As
Installation of Rock and Boulder No. RB-317 (4th Layer)
Coordinates & Top level of Neck Column's 11 No's (2/B,C & D) (3/4,C,D & E) (4/B,C,D,E) @ Jetty 1 at Bo
Shuttering / Formworks for Foundation of Tunnel 1 (crescent) as highlighted
Concrete Pouring for Foundation of Tunnel 1 (crescent) as highlighted
Shuttering/Formworks for Column of Bridge to South Tower (as Highlighted) in Axis 02/A1
Level Location at Column in South Bridge (Axi 02/A1) Zone 7
Steel Reinforcement for Foundation of Tunnel 1 (crescent) as highlighted
Application of Protection Layer of 4mm Thick bituminous protection board for Strip Footing between PC
Steel Reinforcement for Column of Bridge to South Tower (as Highlighted) in Axis 02/A1
Concreting for Column of Bridge to South Tower (as Highlighted) in Axis 02/A1
Surface Preparation prior to start Water Proofing Membrane Under Foundation and wall of Tunnel Zone
Application of Solvent Base Primer Coating Under Foundation and wall of Tunnel Zone 5 (as Highlighted)
Surface Preparation prior to start Water Proofing Membrane at Foundation of South Small Mosque
Application of Primer Coating at Foundation of South Small Mosque
Application of two coats of Bituminous Damp Proofing at Foundation of South Small Mosque
Protection Layer of 4mm Thick Bituminous Protection Board at Foundation of South Small Mosque
Inspection of Crazy cut Stone cladding Installed for Boundary wall @ "Elevation B" (Outer face) @ Disc
Inspection of Crazy cut Stone cladding Installed for Boundary wall @ "Elevation C & D" (Outer face) @
Final Coat cementitious water proofing for Boundary wall (Inner face) @ Elevation A, C & D @ Discover
Second Coat cementitious water proofing for Boundary wall (Inner face) @ Elevation A, C & D @ Discov
First Coat cementitious water proofing for Boundary wall (Inner face) @ Elevation A, C & D @ Discover
Installation of Rock and Boulder No. RB-285 (3rd Layer)
Inspection for Casting the Blinding Concrete under the Footing of Seating Area (1) at Zone-J (SA-9) As Hi
Inspection for Casting the Blinding Concrete under the Foundation of Seating Area (2) at Zone-K (SA-30)
Inspection for Casting the Blinding Concrete under the Foundation of Seating Area (2) at Zone-K (SA-29)
Inspection for casting the Blinding Concrete under Foundation of Seating Area (3) at Zone-K (SA-28) - As
Inspection of Thrust block for Upvc Pipe (Class 5- Ø315M) for Foul Water Drainge Lifting Line from ( CH-
Installation of Pipe and fittings for Foul Water Drainge Lifting Line as per approved shop drawings (d
Surface Preparation Prior to Start Backfilling Between PC # 101 to 99 (crescent Zone 7) as highlighted
Coordinates & Top Levels of Kicker of boundary wall @ span 15, 16 & 17 at Water Garden, as per attac
Concrete pouring & Shuttering for Kicker of boundary wall @ span 15, 16 & 17 at Water Garden, as per
Coordinates & Top level of Footing for boundary wall @ (EXC1-04/05 to EXC3-01/10 & EXC1-12/13 to EX
Coordinates & Top level of Wall @ (EXC4-19/20 to EXC4-28/27) of boundary wall @ Physic Garden at hig
Steel Reinforcement for Footing & Kicker of boundary wall @ (EXC1-04/05 to EXC3-01/10 & EXC1-12/13
Concrete Pouring & Shuttering for Wall @ (EXC4-19/20 to EXC4-28/27) of boundary wall at Physic Garde
Concrete Pouring for Stiffner Column's 14 no's (From Lintels Top to bottom of roof beam) @ Grid 6-9/A,
Steel Reinforcement and Shuttering for Stiffner Column's 14 no's (From Lintels Top to bottom of roof
Inspection of Block work 350mm thk Insulation wall upto Lintel height of window @ Grids 13/F-H &
Inspection of Block work 350mm thk Insulation wall upto Sill level (90cm from F.F.L) @ Grids 6/E-I,
Installation of Rock and Boulder No. RB-323 (4th Layer)
Inspection for application of Protection Layer 4mm Thick Bituminious Protection Board on top of Bitum
Inspection for application of Bituminous Damp Proofing (2nd Coat) on top of Primer at Prayer Area Zone
Inspection for application of Bituminous Damp Proofing (1st Coat) on top of Primer at Prayer Area Zone-
Inspection for application of Primer (50%x50% Bitumin & Water) on Foundation and 1st Part of wall at
Inspection of Concrete Pouring for the Foundation of Seating Area (3) at Zone-G (SA-20,22 ) As Highligh
Pipe Installation of sub-surface drainage main line pipes; 300mmØ & 160mmØ ); and sub- surface pe
Level Location at Column in South Bridge (Axi 02/AB) Zone 7
Concreting for Column of Bridge to South Tower (as Highlighted) in Axis 02/A
Steel Reinforcement for Column of Bridge to South Tower (as Highlighted) in Axis 02/A
Formworks for Kicker (80 cm.) for column and wall of South Small Mosque (as Highlighted)
Shuttering/Formworks for Column of Bridge to South Tower (as Highlighted) in Axis 02/B
Installation of Rock and Boulder No. RB-313 (3rd Layer)
Inspection for application of Cementitious water Proofing at Prayer Area Zone-B (as Highlighted)
"Inspection of Concrete Pouring for the Foundation of Seating Area (3) at Zone-G (SA-21) As Highlighted
Inspection of Steel Reinforcement for the Foundation and Wall of Seating Area (3) at Zone-G (SA-21 ) As
"Inspection of Formwork for the Foundation of Seating Area (1) at Zone-G (SA-11&12 ) As Highlighted"
Inspection of Steel Reinforcement for the Foundation and Wall of Seating Area (1) at Zone-G (SA-11 & 1
Installation of Rock and Boulder No. RB-071 (2nd Layer)
Surface Preparation Prior to Cuting and Filling Below FW - Force Line ( Ø315mm UPVC Class 5 ) (as Hi
Gravel 3/8 Bedding & Geotextile Surround for Sub Surface Main Line 250mm 2no's (MH-D-03-01 to MH
Concrete Pouring for Grade beam @ Grid 19/Q-S, as highlighted in attached Drawing's.
Second coat Damp proofing for Boundary wall Inner Face at Discovery Garden, At highlighted area in at
First coat Damp proofing Prior to Second coat for Boundary wall Inner Face at Discovery Garden, At hig
Primer coat Damp proofing Prior to first coat for Boundary wall Inner Face at Discovery Garden, At high
Gravel 3/8 Bedding & Geotextile Surround for Sub-Surface Drainage main Line (315mm MH-D-8 to MH-D
Inspection of Existing levels Prior to start Excavation & Foundation works at Aviary Garden, As per att
Installation of earthing clamps with conductor 70mm (4pcs.) for earthing reinforcement steel re-bar
Application of Protection layer of 4mm thick bituminous protection board at wall of Tunnel Zone 5 (as H
Application of two Layer of 4mm thick modified bituminous water proofing membrane at wall of Tunnel
Application of Solvent Base Primer Coating at wall of Tunnel Zone 5 (as Highlighted)
Surface Preparation prior to start Water Proofing Membrane at wall of Tunnel Zone 5 (as Highlighted)
Application of Solvent Base coating primer for Strip Footing between PC-101 to 103 (axis 02-G to 02-F)
Application of Single Layer of 4mm thick modified bituminous water proofing membrane for Strip Footi
Probing and grouting works at Zone 1, MCPE-04(new)(91 points)
Probing and grouting works at Zone 1, MCPE-04(new)(91 points)
Coordinates & Top level of Footing concrete for boundary wall @ span 16 & 17 at Water Garden, as pe
Top Levels & Coordinates for Kicker of boundary wall @ span 14 & 15 with at Water Garden, as per att
Concrete pouring & Shuttering for footing of boundary wall @ span 16 & 17 at Water Garden, as per at
Steel Reinforcement for footing & Kicker of boundary wall @ span 16 & 17 at Water Garden, as per att
Concrete pouring for Kicker of boundary wall @ span 14 & 15 at Water Garden, as per attached Drawing
Concrete pouring for footing of boundary wall @ span 14 & 15 at Water Garden, as per attached Drawin
2nd coat Cementitious water proofing for Boundary wall (Outer Face) @ Butterfly Garden, at highlighted
1st coat Cementitious water proofing prior to apply 2nd Coat for Boundary wall (Outer Face) @ Butterfl
2nd coat Damp proofing for Boundary wall (Outer Face) @ Butterfly Garden, at highlighted area's in att
1st coat Damp proofing prior to apply 2nd Coat for Boundary wall (Outer Face) @ Butterfly Garden, at h
Primer coat prior to apply Damp proofing for Boundary wall (Outer Face) @ Butterfly Garden, at highlig
Concrete Pouring for Kicker Extension at Boundary wall (Outer Face) @ Butterfly Garden, at highlighted
2nd layer of water proofing membrane for Pedestal (Column's) Surround 05 no's @ Grids B / 4, 5, 6, 7
1st layer of water proofing membrane for Pedestal (Column's) Surround 05 no's @ Grids B / 4, 5, 6, 7
"Primer prior to water proofing for Pedestal (Column's) Surround 05 no's @ Grids B / 4, 5, 6, 7 & 8 @T
Surface preparation for Pedestal (Column's) Surround 05 no's @ Grids B / 4, 5, 6, 7 & 8 @Ticket booths
Aluminium flashing & Protection Silicon Sealent for Boundary wall Outer Face @ Span 49A, 49B & 50A,
"Inspection of Formwork for the Foundation of Seating Area (1) at Zone-G (SA-13 ) As Highlighted"
Inspection of Steel Reinforcement for the Foundation and Wall of Seating Area (1) at Zone-G (SA-13 ) As
Concreting for Column of Bridge to South Tower (as highlighted) in Axis 02/B.
Concrete pouring for Footing's 16 No's (1/A,B,D & E) (2/A,B,D & E) (3/A,B,C,D & E) (4/B,C & D) and Wal
Concrete pouring for Footing's 11 No's (2/B,C & D) (3/4,C,D & E) (4/B,C,D,E) and Wall Raft footing @ Je
Steel Reinforcement & Shuttering for Footing's 16 No's (1/A,B,D & E) (2/A,B,D & E) (3/A,B,C,D & E) (4/B
Steel Reinforcement & Shuttering for Footing's 11 No's (2/B,C & D) (3/4,C,D & E) (4/B,C,D,E) and Wall
Finish level for Outside of Buttrtfly Garden, at highlighted area's in attached Drawing's.
Steel Reinforcement & Shuttering for Kicker Extension at Boundary wall (Outer Face) @ Butterfly Garden
Surface Preparation of Boundary wall (Outer Face) @ Butterfly Garden, at highlighted area's in attached
Coordinates & Top level of Wall @ (EXC4-11/12 to EXC4-19/20) of boundary wall @ Physic Garden at hig
Concrete Pouring & Shuttering for Wall @ (EXC4-11/12 to EXC4-19/20) of boundary wall at Physic Garde
Steel Reinforcement for Wall @ (EXC4-11/12 to EXC4-27/28) & (EXC4-29/30 to EXC4-41/42) of boundary
Geo-Textile for Blinding under boundary wall @ (EXC1-04/05 to EXC3-01/10 & EXC1-12/13 to EXC3-11/20
Protection Layer 4mm thk. Bituminous Protection Board (Both sides 500mm wide) for Blinding under
Single Layer Water proofing membrane 4mm thk. (Both sides 500mm wide) for Blinding under boundar
Solvent Base Primer (Both sides 500mm wide) for Blinding prior to Water proofing membrane under bo
2nd Coat Cementitious Water Proofing for Blinding under boundary wall @ (EXC1-04/05 to EXC3-01/10
1st Coat Cementitious Water Proofing for Blinding under boundary wall @ (EXC1-04/05 to EXC3-01/10 &
Surface preparation of Blinding prior to Water proofing under boundary wall @ (EXC1-04/05 to EXC3-0
Concreting for Kicker (80 cm.) for column and wall of South Small Mosque (as Highlighted)
Level, Location and Form Works for Column and Wall neck of Crescent South Small Mosque (between ax
Inspection of Concrete Pouring for the walls and Top slab of SBC-01 (Part-A) As Highlighted
Installation of Rock and Boulder No. RB-303 (3rd Layer)
Level Location and Formworks at Column in South Bridge (Axi 02/B) Zone 7
Protection Layer of 4mm thick bituminous protection board for Strip Footing Crescent Zone 2R TIP and
Application of Single Layer of 4mm thick modified bituminous water proofing membrane for Strip Footi
Application of Solvent Base coating primer for Strip Footing Crescent Zone 2R TIP and between PC 200, 1
Surface Preparation Prior to Start Water proofing for Strip Footing Crescent Zone 2R TIP and between PC
Coordinates & Top level of footings & Wall Raft @ Jetty 2 at Boat Garden at highlighted area in attached
Coordinates & Top level of footings & Wall Raft @ Jetty 1 at Boat Garden at highlighted area in attached
Protection Screed 50mm on Blinding Under Footing's @ Jetty # 2 at Boat Garden at highlighted area in
Geo Textile on Blinding Under Footing's @ Jetty # 2 at Boat Garden at highlighted area in attached Drawi
Protection Board on Blinding Under Wall Raft Footing (Both sides 500mm wide) @ Jetty # 2 at Boat Gar
2nd Layer of Bitumenous Membrane for Blinding Under Column Footing's & wall foundation (Both sides
1st Layer of Bitumenous Membrane for Blinding Under Column Footing's & wall foundation (Both sides
Primer Coat for Blinding prior to Membrane Under Column Footing's & wall foundation (Both sides 500
2nd Coat Cementitous Water proofing for Blinding of wall foundation @ Jetty # 2 at Boat Garden at high
1st Coat Cementitous Water proofing for Blinding of wall foundation @ Jetty # 2 at Boat Garden at high
Surface preparation of Blinding prior to Water proofing Under Column Footing's & wall foundations @ J
Protection Board on Blinding Under Wall Raft Footing (Both sides 500mm wide) @ Jetty # 1 at Boat Gar
Protection Board 4mm thick Installed Inside @ Ticket Booth # 05, As per the attached drawing.
Stone Cladding Installed for Boundary wall Outer Face @ Span 26, 27 & 28 As per Attached Highlighted
Installation of Rock and Boulder No. RB-285 (3rd Layer)
Excavation and Surface Preperation prior to start backfilling Sub-Base under Footing of Seating Area (2)
Excavation and Surface Preperation prior to start backfilling Sub-Base under Footing of Seating Area (2)
Inspection of Surface Preperation for the Footing and Wall of Prayer Area at Zone-B, prior to start Wate
Inspection of Surface Preperation for the Footing and Wall of Prayer Area at Zone-I, prior to start Water
Steel Reinforcement for Column of Bridge to South Tower (as Highlighted) in Axis 02/B
Top Levels & Coordinates for footing of boundary wall @ span 14 & 15 with at Water Garden, as per at
Existing levels as per Site @ Geyser Garden, At highlighted area in attached drawings & Survey Data.
Steel Reinforcement for footing & Kicker of boundary wall @ span 14 & 15 at Water Garden, as per att
Stone Cladding for Boundary wall Outer Face @ Span 66B, 67A & 67B As per Attached Highlighted Drawi
Concrete Pouring for Lintels of walls, Doors and Stiffner Column's Between grid 8-10/E-H (for Toilets)
Steel & Shuttering for Lintels of walls, Doors and Stiffner Column's Between grid 8-10/E-H (for Toilets)
Inspection of Crazy cut Stone cladding Installed for Boundary wall @ "Elevation A" (Outer face) @ Disc
Gravel 3/8 Bedding & Geotextile Surround for Sub Surface Main Line 160mm & Gravel Bedding & Geo Te
Inspection of Concrete Pouring for the walls and top slab of SBC-2 (Part-3) As Highlighted
Inspection of Backfilling for the 2 sides and top of SBC-03 - As Highlighted
Inspection of Formwork for the walls and Top slab of SBC-01 (Part-A) As Highlighted
Installation of Rock and Boulder No. RB-246 (Full Boulder - 4 Layers)
Installation of Rock and Boulder No. RB-238 (First Layer)
Excavation and Surface Preperation prior to start backfilling Sub-Base under Footing of Seating Area (3)
Installation of Rock and Boulder No. RB-071 (3rd Layer)
Inspection of Sand Badding Over Pipe Line Foul Water (Class 5- Ø315M) from ( CH- 33 to CH- 49)
Inspection for installation of Warnning Tape for Foul Water (Class 5- Ø315M) from ( CH- 33 to CH-
Installation of stub-up PVC Conduit (25mm-2pcs. each socket) for Power at Water Garden Boundary W
Installation of Rock and Boulder No. RB-144 (First Layer)
Installation of Rock and Boulder No. RB-323 (3rd Layer)
Installation of Rock and Boulder No. RB-071 (Full Boulder - 4 Layers)
Excavation & Surface Preparation for foundation of boundary wall @ span 14, 15, 16 & 17 with Levels
Protection Screed 50mm on Blinding Under Footing's @ Jetty # 1 at Boat Garden at highlighted area in
Geo Textile on Blinding Under Footing's @ Jetty # 1 at Boat Garden at highlighted area in attached Drawi
2nd Layer of Bitumenous Membrane for Blinding Under Column Footing's & wall foundation (Both sides
1st Layer of Bitumenous Membrane for Blinding Under Column Footing's & wall foundation (Both sides
Primer Coat for Blinding prior to Membrane Under Column Footing's & wall foundation (Both sides 500
2nd Coat Cementitous Water proofing for Blinding of wall foundation @ Jetty # 1 at Boat Garden at high
1st Coat Cementitous Water proofing for Blinding of wall foundation @ Jetty # 1 at Boat Garden at high
Surface preparation of Blinding prior to Water proofing Under Column Footing's & wall foundations @ J
Stone Cladding for Boundary wall Inner & Outer Face @ Span 70 As per Attached Highlighted Drawing's.
Stone Cladding for Boundary wall Outer Face @ Span 35 & 36 As per Attached Highlighted Drawing's.
Stone cladding for Boundary wall Outer face, @ Span 37 & 38 As per attached Drawings.
Geo-Textile for Blinding under boundary wall @ (EXC4-11/12 to EXC4-27/28) & (EXC4-29/30 to EXC4-41/4
Protection Layer 4mm thk. Bituminous Protection Board (Both sides 500mm wide) for Blinding under
Single Layer Water proofing membrane 4mm thk. (Both sides 500mm wide) for Blinding under boundar
Solvent Base Primer (Both sides 500mm wide) for Blinding prior to Water proofing membrane under bo
2nd Coat Cementitious Water Proofing for Blinding under boundary wall @ (EXC4-11/12 to EXC4-27/28)
1st Coat Cementitious Water Proofing for Blinding under boundary wall @ (EXC4-11/12 to EXC4-27/28)
Surface preparation of Blinding prior to Water proofing under boundary wall @ (EXC4-11/12 to EXC4-27
Excavation & Bed Preparation for Sub-Surface 110mm Branch Pipes at Aviary Garden, At highlighted are
Installation of Rock and Boulder No. RB-310 (First Layer)
Installation of Rock and Boulder No. RB-300 (Full Boulder - 6 Layers)
Excavation and Surface Preperation prior to start backfilling Sub-Base under Footing of Seating Area (3)
Soil Preperation under Boulder No. RB-311
Surface Preperation prior to start backfilling Near the Site Tower at Zone-L - As Highlighted
Inspection for Formwork and Level Prior to Cast the Concrete for walls and Top Slab of SBC-02 (Part-3)
Inspection of Steel Reinforcement for the Top slab of SBC-01 (Part-A) As Highlighted
Installation of Rock and Boulder No. RB-068 (First Layer)
Installation of Rock and Boulder No. RB-325 (First Layer)
Surface preparation and Excavation prior to Start Installation of Stack Boulders at Water Play Garden, a
Gravel 3/8 Bedding & Geotextile for Sub-Surface Drainage main Pipes (250mm MH-C-3-6 to MH-C-3-5
Stone Cladding for Boundary wall @ Span 68B & 69 (Outer Face) As per Attached Highlighted Drawing's
Stone Cladding for Boundary wall @ Span 67C & 68A (Outer Face) As per Attached Highlighted Drawing'
Concrete Pouring for Wall of Seating Area (SA3-16), as highlighted in attached Drawing's.
Steel Reinforcement for Wall of Seating Area (SA3-16), as highlighted in attached Drawing's.
Top level & Shutter Alignment for Grade beam @ Grid 19/Q-S, as highlighted in attached Drawing's.
Steel & Shuttering for Grade beam @ Grid 19/Q-S, as highlighted in attached Drawing's.
Concrete Pouring for Lintels of window's and Stiffner Column's @ Grid 7-8/A, 4-6/R, 3/T-V & 3-6/X, as h
Steel & Shuttering for Lintels of window's and Stiffner Column's @ Grid 7-8/A, 4-6/R, 3/T-V & 3-6/X, as
Installation of PVC conduit (Stub-up-32mm 1pc. grid no.3/E,sleeve -25mm 3pcS. Grid no.8/ bet.E&F,8
Concrete Pouring for Lintels of walls, Doors and Stiffner Column's @ Grid 20/F-G, 20/P-Q, 19-20/Q and
Installation of stub-up PVC conduit (25mm - 2pcs.) for Voice and Data System at the South Small Mos
Installation of stub-up PVC conduit (25mm - 2pcs.) for CCTV System at the South Small Mosque (grid
Steel & Shuttering for Lintels of walls, Doors and Stiffner Column's @ Grid 20/F-G, 20/P-Q, 19-20/Q and
Inspection of First layer Block layout at grid between 3-5/R-X, as highlighted in attached Drawing's @
Inspection of Crazy cut Stone cladding Installed for Boundary wall @ "Elevation B" (Outer face) @ Disc
Inspection for Sand Bedding Under Upvc Pipe (Class 5- Ø315M) for Foul Water Drainge Lifting Line from
Inspection of Sand Badding Over Pipe Line Foul Water (Class 5- Ø315M) from ( CH- 22 to CH- 33)
Installation of PVC Conduit (stub-up 25mm-8pcs., sleeve 32mm-7pcs. &sleeve 25mm-1pc.) for Lightin
Installation of PVC Conduit (stub-up 25mm-8pcs. & sleeve 32mm-7pcs. ) for Power at Crescent-2 Sou
Installation of Rock and Boulder No. RB-166 (Layer # 7 & 8)
Installation of Rock and Boulder No. RB-167 (11&12 Layers)
Installation of Rock and Boulder No. RB-067 (3rd Layer)
Installation of Rock and Boulder No. RB-313 (3rd Layer)
Inspection for Casting the Blinding Concrete under the Footing of Seating Area (2) at Zone-K (SA-28 & 32
Inspection for casting the Blinding Concrete under Footing of Seating Area (3) at Zone-G (SA-23) - As Hi
"Inspection of Formwork for the Foundation of Seating Area (3) at Zone-G (SA-20,22 ) As Highlighted"
"Inspection of Formwork for the Foundation of Seating Area (1) at Zone-G (SA-10 ) As Highlighted"
Inspection of Steel Reinforcement for the Foundation and Wall of Seating Area (3) at Zone-G (SA-20,22)
Inspection of Steel Reinforcement for the Foundation and Wall of Seating Area (1) at Zone-G (SA-10 ) As
Installation of Rock and Boulder No. RB-071 (2nd Layer)
Inspection to check concreting C(32-40) very severe for retaining wall foundation between axis AQ to AR
Inspection to check Reinforcement for retaining wall Foundation between axis AQ to AR (as highlighted)
Steel Reinforcement for Retaining Wall (WALL) (as Highlighted at AXIS AN TO AP)
Inspection to check concreting C(32-40) very severe for retaining wall foundation between axis AP to AQ
Inspection to check Reinforcement for retaining wall Foundation between axis AP to AQ
Probing and Grouting works at Zone 1, MCPE-04(new) (141 Points)
probing and Grouting Works at Zone 1, MCPE-04(new) (141 Points)
Inspection for installation of Warnning Tape for Foul Water (Class 5- Ø315M) from ( CH- 22 to CH-
Installation of sub-surface drainage main line pipes (upvc class 4); (L=71 m.; 250mm Ø); as per high
Single Layer Membrane water proofing for Retaining wall (Inner Face) @Span 49A, 49B & 50A, As per A
Protection Board for Expansion Joint of Retaining Wall Span 19, 20 & 21, at Boundary Wall (As Highlight
Probing and Grouting works at Zone 1, MCPE (new)(93 points)
Inspection of Second Layer of Water proofing Membrane at Expansion Joint of Retaining Wall Span 19,
Probing and Grouting works at Zone 1, MCPE-04 (new) (100 points)
Inspection of First Layer of Water proofing Membrane at Expansion Joint, Backing Rod and Sealent for
Coordinates & Top level for Kicker at Second lift (Outer face) of boundary wall @ (EXC4-11/12 to EXC4
Excavation & Bed Preparation for Sub-Surface Drainage main Line (315mm MH-D-8 to MH-D-9) at Disco
Inspection of Crazy cut Stone cladding Installed for Boundary wall @ "Elevation C & D" (Outer face) @
Inspection of Concrete pouring for the 2nd part of Wall for Prayer Area at Zone-K (as Highlighted)
Inspection of Concrete Pouring for the 1st part of Wall for Prayer Area at Zone-G (as Highlighted)
Inspection of form work and level for the 2nd part of Wall for Prayer Area at Zone-K (as Highlighted)
Inspection of form work and level for the 1st part of Wall for Prayer Area at Zone-G (as Highlighted)
Installation of Rock and Boulder No. RB-317 (3rd Layer)
Concrete pouring for Blinding Under Column's & wall foundations @ Jetty # 2 at Boat Garden at highlig
Probing and Grouting works at Zone 1, MCPE-04 (new) (100 Points)
50mm Screed Protection at Tunnel Zone 5 (as Highlighted)
Application of Protection Layer of Geotextile Sheet at Tunnel Zone 5 (as Highlighted)
Application of 2nd layer 4mm Thick Modified Bituminous Water Proofing Membrane at Tunnel Zone 5 (a
1st Layer Backfill Around PC 184 & 186 Between Axis AU and AV Zone 2P
Inspection of Thrust block for Upvc Pipe (Class 5- Ø315M) for Foul Water Drainge Lifting Line from ( CH-
Excavation & Bed preparation for Sub Surface Main Line 250mm 2no's (MH-D-03-01 to MH-D-03-02 & M
Surface Preperation prior to start backfilling Near the Site Tower at Zone-M (as Highlighted)
"Notification to start Riprap for bottom of Wadi No.2 as per the attached SCR (As Highlighted)"
Inspection for Casting the Blinding Concrete under the Footing of Seating Area (1) at Zone-G (SA-11 ) As
Inspection for Casting the Blinding Concrete under the Footing of Seating Area (3) at Zone-G (SA-24 ) As
Excavation and Surface Preperation prior to start backfilling Sub-Base under Footing of Seating Area (3)
Level, Location and Formworks for TIP RC Strip Footing Foundation after Axis BC - Zone 2R.
Application of 1st Layer 4mm thick modified Bituminous Water Proofing Membrane at Tunnel Zone 5
Installation of pipe and fittings for foul water drainage lifting line as per approved shop drawing (de
Concrete pouring for Blinding Under Column's & wall foundations @ Jetty # 1 at Boat Garden at highlig
Second line of Stack boulders Installed @ Geyser Garden, At highlighted area in attached drawings & Su
Top level of S.O.G inside @ Ticket Booths # 07, As per the attached drawing.
Concrete Pouring for S.O.G inside @ Ticket Booths # 07, As per the attached drawing.
Steel Reinforcement for S.O.G inside @ Ticket Booths # 07, As per the attached drawing.
Concrete Pouring for Blinding under S.O.G @ Ticket Booths # 07, As per the attached drawing.
Stone Cladding for Boundary wall @ Span 19, 20 & 21 (Outer Face) As per Attached Highlighted Drawing
Concrete Pouring for Kicker of boundary walls @ (EXC4-11/12 to EXC4-27/28) & (EXC4-29/30 to EXC4-41/
Steel Reinforcement for Footing & Pedestal (Kicker) of boundary wall @ (EXC4-11/12 to EXC4-27/28) at
Excavation and Surface Preperation prior to start backfilling Sub-Base under Footing of Seating Area (2)
"Excavation and Bed Preperation under Foundation of SBC-05 (As Highlighted)"
Inspection for application of Protection Board on top of Damp Proofing for External wall and Top Slab o
Inspection for application of Damp Proofing (2nd Coat) on top of Primer for External Wall and Top Slab
Inspection for application of Damp Proofing (1st Coat) on top of Primer for External Wall and Top Slab o
Inspection for application of Primer (1 Coat) on External Wall and Top Slab of SBC-03 (As Highlighted)
Inspection of Concrete Pouring for 2nd part of Wall for Picnic Area (1) at Zone-I (PA-1,2 & 3) As Highligh
Level, Location and Formworks for Column and Wall Neck of Crescent South Small Mosque (between a
Steel Reinforcement for Strip footing at Zone 2R (TIP) Crescent 2 Zone 2.
Concreting for Strip Footing at Zone 2R (TIP) Crescent 2 Zone 2.
Concreting for Kicker (80cm.) for column and wall of South Small Mosque (as highlighted).
Concreting for Kicker (80cm.) for column and wall of South Small Mosque (as highlighted).
Coordinates & Top level of Blinding concrete for Column's & wall foundations @ Jetty 1 & 2 at Boat Gar
2nd Layer Stack Boulders wall Installed at Part 2 @ Boat Garden, at highlighted area in attached Drawin
Stone Cladding for Boundary wall @ Span 68B & 69 (Outer Face) As per Attached Highlighted Drawing's
Stone Cladding for Boundary wall @ Span 67C & 68A (Outer Face) As per Attached Highlighted Drawing'
Location, Level and Formworks for South Bridge Foundation zone-7 Crescent.
Stone Cladding for Boundary wall Inner & Outer Face @ Span 70 As per Attached Highlighted Drawing's.
Concrete Pouring for Lintels of walls, Doors and Stiffner Column upto height 2.1m from F.F.L, between
"Concrete Pouring for Blinding under S.O.G & Grade beam at grid 17-19/N-S, as highlighted in attached
Excavation & Bed Preparation for Sub-Surface Drainage Main & Branch Pipes at Aviary Garden, At highl
Probing & Grouting works at zone-1, MCPE-04 (NEW) (93 points).
Excavation & Bed Preparation for Sub-Surface Drainage main Pipes (250mm MH-C-3-6 to MH-C-3-5 t
"Inspection of Steel reinforcement for Top Slab of SBC-02 (Part-3) As Highlighted"
Installation of Rock and Boulder No. RB-285 (2nd Layer)
Inspection for Casting the Blinding Concrete under the Footing of Seating Area (3) at Zone-G (SA-21 ) As
Inspection for Casting the Blinding Concrete under the Footing of Seating Area (1) at Zone-G (SA-12 & S
Inspection of Thrust block for Upvc Pipe (Class 5- Ø315M) for Foul Water Drainge Lifting Line from ( CH-
Inspection for Installation of Stone cladding for the Wing Wall of the Culverts at Western Wadi (as Highl
Inspection for Installation of Stone cladding for the Wing Wall of the Culverts at Western Wadi (as Highl
Level, Location and Form Works for Foundation of Crescent South Small Mosque
Inspection of Block work 350mm thk wall (200mm outer leaf & 100mm inner leaf including 50mm Insul
Inspection of Block work 350mm thk wall (200mm outer leaf & 100mm inner leaf including 50mm Insul
Inspection of Block work 350mm thk wall (200mm outer leaf & 100mm inner leaf including 50mm Insul
Inspection of First layer Block layout at grid 8-9/Q & 11-13/Q, as highlighted in attached Drawing's @
Final coat of Cementitious Water proofing for Boundary wall Inner Face @ Span 62, 63, 64, 65, 66, 67A
Second coat of Cementitious Water proofing prior to Final coat for Boundary wall Inner Face @ Span 62
First coat of Cementitious Water proofing prior to Second coat for Boundary wall Inner Face @ Span 62,
"Anti Termite Treatment for Base prior to Blinding concrete at grid 17-19/N-S, as highlighted in attach
Steel & Shuttering for Lintels of walls, Doors and Stiffner Column upto height 2.1m from F.F.L, between
Installation of Rock and Boulder No. RB-303 (2nd Layer)
Inspection of Cementitious water proofing (2nd & 3rd Coat) for the Wing Wall of the Culverts at Wester
Excavation and Surface Preperation prior to start backfilling Sub-Base under Footing of Seating Area (2)
"Inspection of Formwork for 2nd part of Wall for Picnic Area (1) at Zone-I (PA-1,2 & 3) As Highlighted"
Inspection of Concrete Pouring for the wall of Seating Area (1) at Zone-J (SA-07, 09) As Highlighted
Inspection of form work and level for the 2nd part of Wall for Prayer Area at Zone-B (as Highlighted)
Inspection of form work and level for the 1st part of Wall for Prayer Area at Zone-K (as Highlighted)
Installation of Rock and Boulder No. RB-071 (3rd Layer)
Installation of Rock and Boulder No. RB-323 (2nd Layer)
Soil Preperation under Boulder No. RB-301
Installation of PVC conduit (Dia.25mm 2pcs.) for CCTV System at the Butterfly Garden as per attache
Installation of PVC conduit (Dia.25mm 2pcs. each Speaker) for Speaker Fire Alarm System at the Butt
Installation of Rock Boulder no.RB-294 (2nd layer)
Installation of Rock and Boulder No. RB-139 (12 &13 Layers)
Installation of Rock and Boulder No. RB-067 (2nd Layer)
Installation of Rock and Boulder No. RB-300 (2nd Layer)
Inspection for casting the Blinding Concrete under Footing of Seating Area (3) (SA-20,22,25) - As Highlig
Inspection of Formwork for the wall of Seating Area (1) at Zone-J (SA-07, 09) As Highlighted
Protection Board for membrane at Retaining wall Outer Face @ Span 49A, 49B & 50A of Boundary wall,
Concrete Pouring for Blinding of boundary walls @ (EXC1-04/05 to EXC3-01/10 & EXC1-12/13 to EXC3-11
Concrete Pouring for Footing of boundary walls @ (EXC4-11/12 to EXC4-27/28) & (EXC4-29/30 to EXC4-4
Notification to start Backfilling of Sub Surface Drainage Pipes @ Aviary Garden, At highlighted area in
Installation of Rock and Boulder No. RB-249 (Full - 4 Layers)
Inspection for Surface Preperation and Structure Repair at Wadi culvert wing wall (as Highlighted)
Inspection of Concrete Pouring for the 1st part of Wall for Prayer Area at Zone-K (as Highlighted)
Inspection of Concrete pouring for the 2nd part of Wall for Prayer Area at Zone-B (as Highlighted)
Inspection to check solvent base primer at Tunnel zone -5 as highlighted.
Inspection to check surface preparation prior to water proofing at Tunnel zone -5 as highlighted.
Excavation and Surface Preperation prior to start backfilling Sub-Base under Footing of Seating Area (
Installation of PVC conduit for Fire Alarm System at the ground floor slab level Ticket Booth # 7 as p
Installation of pipes for rain water pipe size: 110mm (Upvc) class 4; 150mm + 3000mm Length; as per
Installation of pipes sleeve inside wall & grade beam size: 250, 200, 160, 110, 100, 75 mm (Upvc) clas
Installation of PVC conduit (Dia.25mm 1pcs. each camera) for Power (CCTV System) at the Physic Ga
Installation of PVC conduit (Dia.25mm 3pcs. each Speaker) for Fire Alarm System at the Physic Garde
Installation of PVC conduit (Dia.25mm 3pcs. each camera) for CCTV System at the Physic Garden as p
Coordinates & Top level for Kicker of boundary wall @ (EXC4-11/12 to EXC4-27/28) & (EXC4-29/30 to EX
Excavation & Bed Preparation for Sub-Surface Drainage main Line (315mm MH-D-8 to MH-D-9) at Discov
Excavation and Surface preparation for Column's & wall foundations @ Jetty 1 & 2 at Boat Garden at hi
Coordinates & Top level of Blinding concrete for boundary wall foundation @ (EXC1-04/05 to EXC3-01/
Excavation and Surface preparation for boundary wall foundation @ (EXC1-04/05 to EXC3-01/10 & EXC1-
Inspection of Cementitious water proofing (1st Coat) for the Wing Wall of the Culverts at Western Wadi
"Inspection of Concrete Pouring for the Foundation of Seating Area (3) at Zone-J (SA-16 ) As Highlighted
Inspection of Concrete Pouring for the Foundation of Seating Area (2) at Zone-J (SA-22,23 ) As Highlight
Installation of PVC conduit (Dia.75mm sleeve-2pcs.,straight conduit-1pcs.) for Earthing at the Cresc
Soil Preperation under Boulder No. RB-310
Installation of earthing clamps with conductor 70mm (2pcs.) for earthing reinforcement steel re-bar
Excavation and Surface Preparation Prior to Backfilling For FW- Force Line at Zone 4D (as Highlighted fr
Installation of PVC conduit sleeves (Dia.160mm-6pcs.) for Incoming LV cables at the Crescent 2 Sout
Installation of PVC conduit sleeves (Dia.110mm 2pcs. ICT & 2pcs. Fire Alarm & Security) for Incoming
Stack Boulders wall Installed for Layer 1 at Part 2 @ Boat Garden, at highlighted area in attached Drawi
Coordinates & Top level for Footing of boundary wall @ (EXC4-29/30 to EXC4-41/42) at Physic Garden at
Steel Reinforcement for Footing & Pedestal (Kicker) of boundary wall @ (EXC4-29/30 to EXC4-41/42) at
"Top level of Blinding Concrete below S.O.G & Grade Beam at Grid 16-20/Q-S as Highlighted in attache
Inspection of Cementitious water proofing (3rd Coat) for the Wing Wall of the Culverts at Western Wa
Inspection of Cementitious water proofing (2nd Coat) for the Wing Wall of the Culverts at Western Wa
Stack Boulders wall Installed 3rd layer at Planted bed # 2 at Water Play Garden, at highlighted area in
Stack Boulders wall Installed at Planted bed & Top level with Coordinate for 1st, 2nd, 3rd & 4th layers
Coordinates & Top of Blinding for Boundary wall at Sound & Light Garden, At highlighted area in attach
Excavation & Surface preparation prior to cast Blinding for Boundary wall at Sound & Light Garden, As
Excavation and Surface Preperation under Footing of Seating Area (1) (SA-11) - after cutting 20cm for rep
Excavation and Surface Preperation prior to start backfilling Sub-Base under Footing of Seating Area (1)
Inspection of Surface Preperation for external side walls and top slab of SBC-03 prior to start waterproo
Installation of Rock and Boulder No. RB-071 (2nd Layer)
Installation of pipe and fittings for foul water drainage lifting line as per approved shop drawing (de
Level, Location and Formworks for Strip Footing between PC 200 to 198, 199 to 197, 197 to 195 & 198 t
Concreting for Strip Footing Between PC # 101 to 103 (C-32/40 Very Severe)
Reinforcement Steel for Strip Footing Between PC # 101 to 103
Concrete Pouring for Central Bridge Pier Foundation (as Highlighted)
Concrete Pouring for Strip Footing between PC 200 to 198, 199 to 197, 197 to 195 & 198 to 196 (C-32 4
Steel Reinforcement for Strip Footing between PC 200 to 198, 199 to 197, 197 to 195 & 198 to 196
Notification to start Backfilling for Crescent 2 for PC 186 to 183 (as highlighted)
Inspection to check 50mm protection screed below retaining wall foundation between axis AP to AH.
Inspection to check protection layer of geo-textile sheet below retaining wall foundation between axis
Inspection to check 2 layers of 4 mm thick modified bituminious water proofing membrane below retai
Inspection to check solvent base primer coating below retaining wall foundation between axis AP to AH.
Inspection of Cementitious water proofing (3rd Coat) for the Wing Wall of the Culverts at Western Wadi
Inspection of Cementitious water proofing (2nd Coat) for the Wing Wall of the Culverts at Western Wadi
Stack Boulders for Layer 2 & Layer 3 Installed at Planted Bed @ Water Play Garden, at highlighted area
Installation of Pipe and fittings for Foul Water Drainge Lifting Line as per approved shop drawings (d
Existing level for boundary wall Base Before Removing Fill Material @ Water Garden at highlighted area
Notification to start Repair Concrete for Boundary wall (Expansion Joint 3 no's, Old Control Joint 3 no'
Coordinates & Top level for Footing of boundary wall @ (EXC4-11/12 to EXC4-27/28) at Physic Garden at
Steel Reinforcement for Footing & Pedestal (Kicker) of boundary wall @ (EXC4-11/12 to EXC4-27/28) at
Coordinates & Top level for Pedestal (Kicker) for Picnic Area PA1-12, 14, 15, 16 & 17, as highlighted in
Concrete Pouring for Pedestal (Kicker) of Picnic Area PA1-12, 14, 15, 16 & 17, as highlighted in attache
Inspection of Crazy cut Stone cladding Installed for Boundary wall @ "Elevation C & D" (Outer face) @
Inspection for Casting the Blinding Concrete under the Footing of Seating Area (1) at Zone-J (SA-10 ) As
"Inspection of Formwork for the Foundation of Seating Area (3) at Zone-J (SA-16 ) As Highlighted"
Inspection of Steel Reinforcement for the Foundation and Wall of Seating Area (3) at Zone-J (SA-16 ) As
"Inspection of Formwork for the Foundation of Seating Area (2) at Zone-J (SA-22,23 ) As Highlighted"
Inspection of Steel Reinforcement for the Foundation and Wall of Seating Area (2) at Zone-J (SA-22,23 )
Installation of Rock and Boulder No. RB-143 (Layer # 1)
Soil Preperation under Boulder No. RB-325
Highlighted drawings showing structural repairing area prior to proceed with repairing works Site To
Installation of earthing clamps (3pcs.) with conductor 70mm for earthing reinforcement steel re-bar
Concrete Pouring for Retaining wall (wall) (as Highlighted at Axis AP tp AR) C-32/40 very severe SRC
Steel Reinforcement for Retaining Wall (WALL) (as Highlighted at AXIS AP TO AR)
Level , Location and Formworks for blinding concrete for foundation in tunnel 2 crescent zone 6
30 mm Screed Protection of Water Proofing for Strip Footing Crescent Zone 2R TIP (as Highlighted)
Protection Layer of Geo-textile sheet-180 gr per sq.m. for Strip Footing Crescent Zone 2R TIP (as Highlig
Application of Single Layer of 4mm thick modified bituminous water proofing membrane for Strip Footin
Application of Solvent Base coating primer for Strip Footing Crescent Zone 2R TIP (as Highlighted)
Surface Preparation Prior to Start Water proofing for Strip Footing Crescent Zone 2R TIP (as Highlighted)
30 mm Screed Protection of Water Proofing for Strip Footing Between PC 200-198, 199-197, 197-195, 1
Protection Layer of Geo-textile sheet-180 gr per sq.m. for Strip Footing Between PC 200-198, 199-197,
Application of Single Layer of 4mm thick modified bituminous water proofing membrane for Strip Foo
Application of Solvent Base coating primer for Strip Footing Between PC 200-198, 199-197, 197-195, 19
Surface Preparation Prior to Start Water proofing for Strip Footing Crescent between PC 197 - 195 and
Concrete Pouring for Retaining Wall Foundation (as Highlighted at grid 01/AJ to 01/AL) C-32/40 VERY S
Steel Reinforcement for Retaining Wall Foundation (as Highlighted at Grid 01/AJ to 01/AL)
Concrete Pouring for Retaining Wall Foundation (as Highlighted at grid 01/AF to 01/AH) C-32/40 VERY
Concrete Pouring for Retaining Wall Foundation (as Highlighted at grid 01/AL to 01/AN) C-32/40 VERY
Steel Reinforcement for Retaining Wall Foundation (as Highlighted at AXIS 01/AF to 01/AH)
Steel Reinforcement for Retaining Wall Foundation (as Highlighted at AXIS 01/AL to 01/AN)
2nd layer Stack Boulders Installed at Planted bed # 2 & 3 @ water play Garden, At highlighted area in
Second coat Damp proofing applied for Boundary wall Inner Face @ Span 62, 63, 64, 65, 66, 67A & 67B,
First coat Damp proofing applied prior to Second coat for Boundary wall Inner Face @ Span 62, 63, 64,
Second coat Damp proofing applied for Boundary wall Inner Face @ Span 59, 60, 61A & 61B, As per Att
First coat Damp proofing applied prior to Second coat for Boundary wall Inner Face @ Span 59, 60, 61A
Primer coat prior to First coat Damp proofing for Boundary wall Inner Face @ Span 59, 60, 61A & 61B,
Primer coat applied prior to First coat Damp proofing for Boundary wall Inner Face @ Span 62, 63, 64,
Final coat of Cementitious Water proofing for Boundary wall Inner Face @ Span 62, 63, 64, 65, 66, 67A
Second coat of Cementitious Water proofing prior to Final coat for Boundary wall Inner Face @ Span 62
First coat of Cementitious Water proofing prior to Second coat for Boundary wall Inner Face @ Span 62,
Surface preparation prior to apply Damp proofing & Stone cladding for Boundary wall Inner Face @ Span
Final coat of Cementitious Water proofing for Boundary wall Inner Face @ Span 59, 60, 61A & 61B, As p
Second coat of Cementitious Water proofing prior to Final coat for Boundary wall Inner Face @ Span 59
First coat of Cementitious Water proofing prior to Second coat for Boundary wall Inner Face @ Span 59
Surface preparation prior to start Backfilling inside @ Sound & Light Garden, At highlighted area in att
Soil Preperation under Boulder No. RB-151
Inspection for backfilling at Bus Station Area (As Highlighted)
Inspection of form work and level for the 2nd part of Wall for Prayer Area at Zone-B (as Highlighted)
Excavation and Surface Preperation prior to start backfilling Sub-Base under Footing of Seating Area (3)
Excavation and Surface Preperation prior to start backfilling Sub-Base under Footing of Seating Area (3)
Installation of Rock and Boulder No. RB-167 (Top Layer)
Stack Boulders wall Installed for Layer's 3, 4, 5, 6, 7, 8, 9 & 10 (8 layers) @ Water Play Garden, At high
Top of Blinding under S.O.G @ Ticket Booths # 07, As per the attached drawing.
Anti Termite Prior to Blinding under S.O.G @ Ticket Booths # 07, As per the attached drawing.
Concrete Pouring for Footing @ New Ticket Booths # 1A & 2A, As per the attached drawing.
Primer Coat Damp proofing for Footing & Pedestal (Out side) @ New Ticket Booths # 3A, 4A & 5A, As pe
Surface Preparation prior to Damp proofing for Footing & Pedestal (Out side) @ New Ticket Booths # 3A
Single Layer Membrane water proofing for Expansion Joint with Backing Rod & Sealent for Boundary w
Surface preparation prior to apply Damp proofing & Install Riyadh Stone cladding for Boundary wall In
Stone Cladding Installed for Boundary wall Outer Face @ Span 26, 27 & 28 As per Attached Highlighted
Notification to start Backfilling inside @ Sound & Light Garden, As per attached highlighted Drawing's.
Coordinates & Top of Blinding for Boundary wall at Sound & Light Garden, At highlighted area in attach
Excavation & Surface preparation prior to cast Blinding for Boundary wall at Sound & Light Garden, As
Concrete pouring for Kicker of Picnic Area PA1-07, 08, 09, 10 & 11, as highlighted in attached Drawing's
Concrete Pouring for Footing's of Picnic Area PA1-12, 14, 15, 16 & 17, as highlighted in attached Drawin
Inspection of Concrete Pouring for the wall and Top Slab of SBC-02 (Part-2) As Highlighted
Installation of Rock and Boulder No. RB-166 (Layer # 3,4,5,6,7)
Inspection of Cocrete Pouring for the Foundation of Seating Area (1) at Zone-J (SA-07 ) As Highlighted
Inspection of Concrete Pouring for 1st part of Wall for Picnic Area (1) at Zone-I (PA-1, 2 & 3) As Highlig
Excavation and Surface Preperation prior to start backfilling Sub-Base under Footing of Seating Area (1)
Installation of Rock and Boulder No. RB-142 (5th Layer)
Installation of Rock and Boulder No. RB-238 (First Layer)
Installation of Rock and Boulder No. RB-082 (Full Boulder - 4 Layers)
Application of protection layer of non woven geo textile sheet 180 gr. Per sq.m Below foundation of Ret
Application of protection layer of 4mm thk bituminous protection board Below foundation of Retaining
Application of 2nd layer 4mm THK modifie bituminous water proofing membrane - reinforced with polye
Application of 1st layer 4mm THK modifie bituminous water proofing membrane - reinforced with polye
Application of Solvent Base Primer Coating Below foundation of Retaining wall at Axis AF to AH
Application of Cementitious Water Proofing Below foundation of Retaining wall at Axis AF to AH
Surface Preparation Prior to start Application of Cementitious Water Proofing Below foundation of Retai
Concrete Pouring for Foundation of Bridge to South Tower (as Highlighted)
Steel Reinforcement for Foundation of Bridge to South Tower (as Highlighted)
Location, Level and Form works for South Bridge foundation zone 7 crescent
Single Layer Membrane water proofing for Boundary wall (Outer Face) @Span 49A, 49B & 50A As per At
Primer coat Prior to apply Single Layer Membrane water proofing for Boundary wall (Outer Face) @Sp
Concrete Pouring for Window Sill, window top Lintel, Lintel for walls & Doors at grid 6-9/A, 9-18/B, 3
Installation of Rock and Boulder No. RB-141 (First Layer)
Inspection of Concrete Pouring for 1st part of Wall for Picnic Area (1) at Zone-I (PA-6 & PA-13) As Highli
Inspection of Cocrete Pouring for the Foundation of Seating Area (1) at Zone-J (SA-09 ) As Highlighted
"Inspection of Formwork for 1st part of Wall for Picnic Area (1) at Zone-I (PA-6 & PA-13) As Highlighted
Inspection of form work and level for the 1st part of Wall for Prayer Area at Zone-K (as Highlighted)
Installation of PVC conduit for Security System at the ground floor slab level Ticket Booth # 7 as per
Installation of PVC conduit for Fire Alarm System at the ground floor slab level Ticket Booth # 7 as p
Installation of PVC conduit for Voice and Data System at the ground floor slab level Ticket Booth # 7
Installation of stub-up PVC conduit (Dia.-110mm-1 pc.) for Incoming Low Voltage Supply at Ticket Boot
Installation of PVC conduit for power at the ground floor slab level Ticket Booth # 7 as per highlight
Surface preparation prior to install Riyadh Crazy cut Stone Cladding for Boundary wall Outer Face at M
Coordinates & Top level for Kicker (Pedestal) for Picnic Area PA1-07, 08, 09, 10 & 11, as highlighted in
Steel Reinforcement & Shutter for Window Sill, window top Lintel, Lintel for walls & Doors at grid 6-9
Gravel 3/8 Bedding & Geotextile for Sub-Surface Drainage main Pipes (250mm MH-C-3-6 to MH-C-3-5
Application of Solvent Base coating primer for Pile Cap 183 to 186
Application of Single Layer of 4mm thick modified bituminous water proofing membrane for Pilecap 183
Protection Layer of 4mm Thick bituminous protection board for Pilecap 183 to 186
Location, Level and Form works for Retaining wall Foundation at Axis AD to AF - INNER
Inspection for Installation of Stone cladding for the Wing Wall of the Culverts at Western Wadi (as Highl
Installation of Rock and Boulder No. RB-294 (2nd Layer)
Excavation and Surface Preparation Prior to Backfilling for FW-Force Line at Zone 5A (as highlighted f
Steel Reinforcement for Retaining Wall Foundation (as Highlighted at AXIS 01/AD to 01/AF)
Concrete Pouring for Retaining Wall Foundation (as Highlighted at grid 01/AD to 01/AF) C-32/40 VERY
Cocnrete Pouring for Foundation of South Small Mosque (as Highlighted)
Steel Reinforcement for Foundation of South Small Mosque (as Highlighted)
Inspection for Formwork and Level Prior to Cast the Concrete for Top Slab of SBC-02 (Part-2) As Highlig
"Inspection of Steel reinforcement for Top Slab of SBC-02 (Part-2) As Highlighted"
"Inspection of Formwork for the Foundation of Seating Area (1) at Zone-J (SA-07 ) As Highlighted"
Inspection of Steel Reinforcement for the Foundation and Wall of Seating Area (1) at Zone-J (SA-07 ) As
Concrete Pouring for Retaining Wall Foundation (as Highlighted at grid 01/AH to 01/AJ) C-32/40 VERY
Steel Reinforcement for Retaining Wall Foundation (as Highlighted at AXIS 01/AH to 01/AJ)
Location, Level and Form works for Retaining wall Foundation at Axis AH to AJ - INNER
Application of Single Layer of 4mm thick modified bituminous water proofing membrane for Strip Footi
Application of Geotextile and Protection Layer of 4mm Thick bituminous protection board for Strip Foo
Application of Solvent Base coating primer for Strip Footing between PC-101 to 103 (axis 02-G to 02-F)
Surface Preparation Prior to start Waterproofing for strip footing Between PC-101 to 103 (axis 02-G to 0
Installation of pipe and fittings for Foul Water Drainage lifting lines as per approved shop dwg.
Installation of Rock and Boulder No. RB-303 (2nd Layer)
Installation of Rock and Boulder No. RB-061 (Full Boulder - 4 Layers)
Installation of Rock and Boulder No. RB-313 (Full Boulder - 3 Layers)
Installation of Rock and Boulder No. RB-285 (2nd Layer)
"Inspection for Laying of Riprap at Open Channel CH-2 (From ST-19.81 to ST-106.00) Bottom and Slope
"Inspection of Formwork for the Foundation of Seating Area (1) at Zone-J (SA-09 ) As Highlighted"
Inspection of Steel Reinforcement for the Foundation and Wall of Seating Area (1) at Zone-J (SA-09 ) As
Inspection of Concrete Pouring for the foundation of Prayer Area at Zone-G (as Highlighted)
Notification to Start Grading (Cutting & Filling) to remove the disposal material to bottom of finishing l
Coordinates & Top Level of Pedestal (Column's 08 no's @ Grids B / 01 to 08) & Anchor bolts for foun
Inspection of Concrete Pouring for the 1st part of Wall for Prayer Area at Zone-B (as Highlighted)
Inspection of Sand Backfilling Over Pipe Line Foul Water (Class 5- Ø315M) from ( CH- 12 to CH- 21)
Inspection of Sand Backfilling Over Pipe Line Foul Water (Class 5- Ø315M) from ( CH- 2 to CH- 12)
Concrete pouring & Top level of Kicker Extension for Boundary wall at Maze Garden, As per attached hi
Steel reinforcement and Shuttering of Kicker Extension for Boundary wall at Maze Garden, As per attac
Co-ordinates & Top level of Footing at New Ticket booths # 1A & 2A, As per the attached drawing.
Steel Reinforcement for Footing & Pedestal (Beam) at New Ticket booths # 1A & 2A, As per the attache
Second caot Damp proofing for Boundary wall Outer Face @ Span 59, 60, 61A & 61B As per Attached Hi
First caot Damp proofing prior to Second caot for Boundary wall Outer Face @ Span 59, 60, 61A & 61B
Primer caot Damp proofing prior to First caot for Boundary wall Outer Face @ Span 59, 60, 61A & 61B A
Final caot Cementitious water proofing for Boundary wall Outer Face @ Span 59, 60, 61A & 61B As per
Second coat Cementitious water proofing prior to Final caot for Boundary wall Outer Face @ Span 59,
First caot Cementitious water proofing prior to Second caot for Boundary wall Outer Face @ Span 59,
Coordinates & Top level for Footing's for Picnic Area PA1-12, 14, 15, 16 & 17, as highlighted in attache
Steel Reinforcement & Shuttering for Footing & Kicker (Pedestal) for Picnic Area PA1-12, 14, 15, 16 & 17
Stone cladding for Boundary wall Inner face @ Span 71, 72 & 73 as per attached drawings.
Stone cladding for Boundary wall Outer face @ Span 37 & 38 as per attached drawings.
Installation of Stone cladding for Boundary wall Outer face, @ Span 39, 40 & 41 as per attached draw
Inspection for installation of Warnning Tape for Foul Water (Class 5- Ø315M) from ( CH- 2 to CH- 2
nstallation of sub-surface drainage main line pipes (upvc class 4); (L=28.7 m.; 250mm Ø); (L=50.8 m
Surface preparation prior to apply Damp proofing & Install Riyadh Stone cladding for Boundary wall O
Inspection of 6 layers Block works of 150mm thick wall, 100mm thick wall, 250mm wall with 50mm Cav
Inspection of Block work 350mm thick wall (200mm thick outer leaf & 100mm thick inner leaf includi
Inspection of First layer Block layout at grid 6/E-J & M-R, 5-6/U and all the showers between grid 7-9
Inspection of Block work of 100mm thick single wall, 150 mm thick single wall and 250mm (100mm wall
Inspection of 9 layers Block work of 350mm (200mm thick outer leaf & 100mm thick inner leaf includ
Inspection for Cutting under Boulder No. RB- 068
"Inspection of Concrete Pouring for Footing of Picnic Area (1) at Zone-I (PA-13 ) As Highlighted"
Inspection of Concrete Pouring for Footing and 1st part of Wall for Picnic Area (1) at Zone-I (PA-4,5 ) As
Anchor bolts for Pedestal (Column's 08 no's @ Grids B / 01 to 08) of Ticket booths Canopy.
Concrete pouring for Footing's of Picnic Area PA1-07, 08, 09, 10 & 11, as highlighted in attached Drawin
Stack boulders Installed Layer 1 at Planted bed # 2 & 3 @ Water Play Garden, At highlighted area in at
Co-ordinates & Top level of Kicker (Starter of wall) at New Ticket booths # 6A & 7A, As per the attached
Second Coat Damp proofing for Blinding of New Ticket Booths # 1A & 2A, As per the attached drawing.
First Coat Damp proofing prior to Second coat for Blinding of New Ticket Booths # 1A & 2A, As per the
Primer Coat Damp proofing prior to First coat for Blinding of New Ticket Booths # 1A & 2A, As per the a
Surface Preparation prior to Damp proofing for Blinding of New Ticket Booths # 1A & 2A, As per the att
Second Coat Damp proofing for Footing & pedestal (out side) of New Ticket Booths # 6A & 7A, As per t
First Coat Damp proofing prior to Second coat for Footing & pedestal (out side) of New Ticket Booths #
Primer Coat Damp proofing prior to First coat for Footing & pedestal (out side) of New Ticket Booths #
Surface Preparation prior to Damp proofing for Footing & pedestal (out side) of New Ticket Booths # 6A
Concrete pouring for Pedestal (Beam) @ New Ticket Booths # 3A, 4A & 5A, As per the attached drawing.
Surface Preparation prior to Install Riyadh stone cladding for Boundary wall Outer Face @ Span 62, 63,
Stone Cladding for Boundary wall Inner & Outer Face @ Span 70 As per Attached Highlighted Drawing's.
Stone Cladding for Boundary wall Outer Face @ Span 29, 30 & 31 As per Attached Highlighted Drawing's
Stone Cladding for Boundary wall Outer Face @ Span 23, 24 & 25 As per Attached Highlighted Drawing's
Stone Cladding for Boundary wall Outer Face @ Span 35 & 36 As per Attached Highlighted Drawing's.
Stone Cladding for Boundary wall Outer Face @ Span 32, 33 & 34 As per Attached Highlighted Drawing's
Inspection of Steel reinforcement for Top Slab of SBC-02 (Part-2 & Part-3) As Highlighted
Inspection of formwork for the foundation of Prayer Area at Zone-G (as Highlighted)
Inspection of Steel Reinforcement for the foundation and wall of Prayer Area at Zone-G (as Highlighted
Inspection of form work and level for the 1st part of Wall for Prayer Area at Zone-B (as Highlighted)
"Inspection for application of Protection Layer of Geo-Textile Sheet on top of Bituminous Damp Proofing
Excavation and Surface Preperation prior to start backfilling Sub-Base under Footing of Seating Area (2)
Excavation and Surface Preperation prior to start backfilling Sub-Base under Footing of Seating Area (3)
Mock up for Box fiber Optic Media converter (CCTV System) Color matching with the Boundary wall
Installation of pipe and fittings for foul water drainage lifting line as per approved shop drawing (
Excavation and Surface Preparation prior to start BAckfilling Sub-Base under Footing of Seating Area (
Inspection for Excavation of Open Channel CH-2 (From ST-19.81 to ST-106.00) Bed and Slope, prior to
"Concrete pouring for Pedestal (Column's) 05 no's @ Grids (B / 4, 5, 6, 7 & 8) of Ticket booths Canopy."
Inspection of Steel Reinforcement for the Foundation and Wall of Picnic Area (1) at Zone-I (PA-13 ) As H
Inspection of Formwork for the Foundation and Kicker of Wall for Picnic Area (1) at Zone-I (PA-13) As H
"Inspection for application of Protection Layer of Geo-Textile Sheet on top of Bituminous Damp Proofing
Inspection for application of Bituminous Damp Proofing (2nd Coat) on top of Primer at Seating Area (1)
Inspection for application of Bituminous Damp Proofing (1st Coat) on top of Primer at Seating Area (1)
"Inspection for application of Base Primer Coating (50%x50% Water Damp prof) on Top of Blinding concre
Inspection of Thrust block for Upvc Pipe (Class 5- Ø315M) for Foul Water Drainge Lifting Line from ( CH-
Stack Boulders for Layer 2 & Layer 3 Installed at Planted Bed @ Water Play Garden, at highlighted area i
Top level for S.O.G Inside Ticket booths # 4, 5 & 6.
Concrete pouring for S.O.G Inside Ticket booths # 4, 5 & 6.
Location, Level and Form works for Retaining wall Foundation at Axis AF to AH - INNER
Concrete Pouring for blinding of boundary wall foundation @ (EXC4-29/30 to EXC4-41/42) ( EXC4-11/12
Location, Level and Form works for Retaining wall Foundation at Axis AL to AN - INNER
Excavation & Bed Preparation for Sub-Surface Drainage main Pipes (250mm MH-C-3-6 to MH-C-3-5 t
Second caot Damp proofing for Boundary wall Outer Face @ Span 62, 63, 64, 65, 66, 67A & 67B As per
First caot Damp proofing prior to Second caot for Boundary wall Outer Face @ Span 62, 63, 64, 65, 66,
Primer caot Damp proofing prior to First caot for Boundary wall Outer Face @ Span 62, 63, 64, 65, 66,
Surface Preparation prior to Primer caot Damp proofing for Boundary wall Outer Face @ Span 62, 63, 6
Final caot Cementitiuos water proofingfor Boundary wall Outer Face @ Span 62, 63, 64, 65, 66, 67A &
Second caot Cementitiuos water proofing prior to Final caot for Boundary wall Outer Face @ Span 62, 6
First caot Cementitiuos water proofing prior to Second caot for Boundary wall Outer Face @ Span 62, 6
Concrete Pouring for Retaining Wall Foundation (as Highlighted at grid 01/AF to 01/AH) C-32/40 VERY
Concrete Pouring for Retaining Wall Foundation (as Highlighted at grid 01/AL to 01/AN) C-32/40 VERY
Steel Reinforcement for Retaining Wall Foundation (as Highlighted at AXIS 01/AF to 01/AH)
Steel Reinforcement for Retaining Wall Foundation (as Highlighted at AXIS 01/AL to 01/AN)
Surface Preparation Prior to Start Water proofing for Pilecap # 183,184,185,186
Surface Preparation Prior to Start Water proofing for Strip Footing Crescent between PC 199-197 and 1
Inspection for the Installation of Geotextile and Gravel at Open Channel CH-2 (From ST-19.81 to ST-106
Primer coat prior to membrane on blinding concrete for boundary wall @ span 14, 15, 16 & 17 at Water
Second Coat cementitious water proofing on blinding concrete for boundary wall @ span 14, 15, 16 &
First Coat cementitious water proofing on blinding concrete for boundary wall @ span 14, 15, 16 & 17
Co-ordinates & Top level of Pedestal (Beam) at New Ticket booths # 3A, 4A & 5A, As per the attached d
Steel Reingforcement for S.O.G Inside Ticket booths # 4, 5 & 6.
Concrete pouring for Footing @ New Ticket Booths # 3A, 4A & 5A, As per the attached drawing.
Concrete Pouring for Corebel Extension of Boundary wall @ Span 64, 65, & 67A. As per Attached Drawing
Steel Reinforcement for Footing & Pedestal and Shuttering @ New Ticket Booths # 3A, 4A & 5A, As per th
Notification to Start Excavation for Boundary wall at Sound & Light Garden, As per attached highlighted
Coordinates & Top level for Footing's for Picnic Area PA1-07 & 08, as highlighted in attached Drawing's.
Steel Reinforcement & Shuttering for Footing & Kicker (Pedestal) for Picnic Area PA1-09, 10 & 11, as hi
Installation of sub-surface drainage main line pipes (upvc class 4); L=19.6 m.; 250mm Ø as per high
Installation of Rock and Boulder No. RB-300 (2nd Layer)
Inspection of Concrete Pouring for Foundation and kicker of SBC-01 (Part-A) As Highlighted
Installation of Rock and Boulder No. RB-060 (3rd Layer)
Installation of Rock and Boulder No. RB-062 (2nd Layer)
Inspection of Control Joint Repair work for Boundary wall at Maze Garden, (14 Joints) (Outer Face) As p
First line of Stack boulders Installed @ Geyser Garden, At highlighted area in attached drawings & Surve
Concrete pouring for Blinding prior to S.O.G Inside, Ticket booths # 4, 5 & 6.
Concrete Pouring for Blinding prior to foundation @ New Ticket Booths # 1A & 2A, As per the attached
Installation of Rock and Boulder No. RB-067 (First Layer)
Installation of Rock and Boulder No. RB-072 (Full Boulder - 4 Layers)
Excavation and Surface Preperation prior to start backfilling Sub-Base under Footing of Seating Area (3)
Inspection of Cementitious water proofing (1st Coat) for the Wing Wall of the Culverts at Western Wadi
Inspection of Bed Preperation for Open Channel CH-2 (From ST-19.81 to ST-106.00) Bottom and Slope, pr
"Inspection for application of Base Primer Coating (50%x50% Water Damp prof) on Top of Blinding concre
Inspection for application of Bituminous Damp Proofing (1st Coat) on top of Primer at Seating Area (1)
"Inspection for application of Base Primer Coating (50%x50% Water Damp prof) on Top of Blinding concre
"Inspection of Concrete Pouring for Footing of Picnic Area (1) at Zone-I (PA-1,2,3,4,5,6 ) As Highlighted"
Inspection of Concrete Pouring for the 2nd part of Wall for Prayer Area at Zone-J (as Highlighted)
Inspection of Concrete Pouring for the foundation of Prayer Area at Zone-K (as Highlighted)
Excavation and Surface Preperation prior to start backfilling Sub-Base under Footing of Seating Area (2)
"Inspection for application of Protection Layer of Geo-Textile Sheet on top of Bituminous Damp Proofing
Inspection for Application of Anti-Termite under footing of Seating Area (3) prior to Casting Blinding Co
Inspection for Application of Anti-Termite under footing of Seating Area (2) prior to Casting Blinding C
Inspection for Casting the Blinding Concrete under the Footing of Seating Area (3) at Zone-J (SA-16,17 )
Inspection for Casting the Blinding Concrete under the Footing of Seating Area (2) at Zone-J (SA-20,21,2
Inspection for Casting the Blinding Concrete under the Footing of Seating Area (1) at Zone-J (SA-7 ) As H
Level, Location and Form Works for Foundation of Central Bridge at Axis AI and Axis AJ - Zone 4
Excavation & Bed preparation prior to Sub Base under Stack boulder and Path @ Geyser Garden, At hig
Notification to start removing loose soil under Water Garden boundary wall @ Highlighted spans area i
Final Coat cementitious water proofing for Boundary wall @ Span 56, 57, 58, 67C, 68A, 68B & 69 (Outer
Second Coat cementitious water proofing prior to apply Final coat for Boundary wall @ Span 56, 57, 58
Inspection of 1st layers Block Layout at grid 3-6/R. 3/R-X & 3-5/X, as same as highlighted in attached
Level, Location and Form Works for Foundation of Crescent South Small Mosque
Level, Location and Form Works for Retaining Wall Foundation Between Axis (AJ to AL)
Steel Reinforcement for Retaining Wall Foundation (as Highlighted at Grid 01/AJ to 01/AL)
Concrete Pouring for Retaining Wall Foundation (as Highlighted at grid 01/AJ to 01/AL) C-32/40 VERY S
Stack Boulders wall & Check Top level & Coordinate for Layer 1 & Layer 2 Installed at Water Play Gar
Inspection of Steel Reinforcement & Shuttering for Boundary wall - Corebel Extension @ Span 64, 65,
Second coat of Damp proofing for Boundary wall (Outer Face) @ Span (56, 57 & 58) & (67C, 68A, 68B &
First coat of Damp proofing for Boundary wall (Outer Face) @ Span (56, 57 & 58) & (67C, 68A, 68B & 69
First Coat cementitious water proofing prior to apply second coat for Boundary wall @ Span 56, 57, 58
Surface preparation prior to start Backfilling @ Aviary Garden, At highlighted area in attached drawings
Inspection of Formwork for the Foundation and Kicker of Wall for Picnic Area (1) at Zone-I (PA-1,2,3 ) A
Inspection of Steel Reinforcement for the Foundation and Wall of Picnic Area (1) at Zone-I (PA-1,2,3 ) A
Inspection for Application of Anti-Termite under footing of Seating Area (1) prior to Casting Blinding Co
Inspection of formwork for the foundation of Prayer Area at Zone-K (as Highlighted)
Inspection of Steel Reinforcement for the foundation and Wall of Prayer Area at Zone-K (as Highlighted
Installation of Rock and Boulder No. RB-071 (First Layer)
Installation of Rock and Boulder No. RB-323 (First Layer)
Installation of PVC conduit (stub-up-32mm & straight 25mm-MAZ/CAM-1,11&12),(stub-up-25mm & st
Installation of PVC conduit (stub-up-32mm & straight-25mm) and Weatherproof Box for Power (CCT
Co-ordinates & Top level of Blindings Concrete at New Ticket booths # 1A & 2A, As per the attached dra
Anti Termite Treatement for Base prior to Blinding Concrete @New Ticket Booths # 1A & 2A, As per the
Primer coat of Damp proofing for Boundary wall (Outer Face) @ Span (56, 57 & 58) & (67C, 68A, 68B &
Surface Preparation prior to apply primer coat water proofing for Boundary wall (Outer Face) @Span
Inspection of Mock up sample for Crazy Cut at Plaza Area.
Proposed Location of New conctrol point for Crescent Traverse
Inspection for Exsisting Boulders and Conctrol Points at New MCPE Location
Concrete Pouring for Retaining Wall Foundation (as Highlighted at grid 01AN to 01AP)
Steel Reinforcement for Retaining Wall Foundation (as Highlighted at Grid 01AN to 01AP)
Excavation & soil preparation prior to sub base under stack boulder @ water play Garden, At highlighte
Installation of Rock and Boulder No. RB-317 (2nd Layer)
Installation of Rock and Boulder No. RB-167 (Layer No. 4,5,6,7,8,9)
Inspection for application of Bituminous Damp Proofing (2nd Coat) on top of Primer at Picnic Area (1) a
Inspection for application of Bituminous Damp Proofing (1st Coat) on top of Primer at Picnic Area (1) a
Inspection for application of Base Primer Coating (50%x50% Water Damp prof) on Top of Blinding concre
Installation of PVC conduit (stub-up-32mm & straight-25mm) and Weatherproof Box for Power (CCTV
Installation of PVC conduit (stub-up-32mm & straight 25mm-DG/CAM-2,11&29),(stub-up-25mm & str
Surface Preparation prior to apply primer coat Damp proofing for Boundary wall (Outer Face) @ Span 6
Gravel 3/8 Bedding & Geotextile Surround for Sub-Surface Main Pipes installation (Pipe: 160mm M
"Coordinates & Top Level of Pedestal (Column's 08 no's @ Grids B / 01 to 08) & Anchor bolts for found
Top of Blinding under S.O.G Inside Ticket booths # 4, 5 & 6.
Concrete Pouring for Pedestal (beam) at New Ticket booths # 6 & 7.
Anti Termite Treatement for base prior to Blinding Inside Ticket booths # 4, 5 & 6.
Inspection of Crazy cut Stone cladding Installed for Boundary wall (Outer face) @ Discovery Garden, At
Installation of Rock and Boulder RB-327 (Full Boulder Installation - 3 Layers).
Installation of Pipe and fittings for Foul Water Drainge Lifting Line as per approved shop drawings (de
Installation of Pipe and fittings for Foul Water Drainge Lifting Line as per approved shop drawings (
Surface preparation Boundary wall Prior to install Riyadh Stone cladding for Inner & Outer face @ Sp
Inspection of Bakcfilling over pipe Line exept of Joints for foul water drainge lifting line (as highlighted
1st layer Stack Boulders Installed at Planted bed @ water play Garden, At highlighted area in attached
Excavation for foundation of New Ticket booths # 1 & 2.
Surface preparation prior to Excavation for foundation at New Ticket booths # 1 & 2.
Gravel 3/8 Bedding & Geotextile Surround for Sub-Surface Drainage Pipes (MH-D-1-3 to MH-D-1-4) @ So
Concrete Pouring for Stiffner, Lintel for Door opening (level = 2.10m), Sill level for windows (90cm)
Excavation and Surface Preperation prior to start backfilling Sub-Base under Footing of Seating Area (1)
Excavation and Surface Preperation prior to start backfilling Sub-Base under Footing of Seating Area (3)
Notification to start Backfilling Over the Two Existing Culvert (As Highlighted)
Installation of Rock and Boulder No. RB-292 (Full Boulder - 3 Layers)
Installation of Rock and Boulder No. RB-082 (3rd Layer)
Inspection for Surface Preperation and Structure Repair at Wadi culvert wing wall (as Highlighted)
Inspection for Application of Anti-Termite under footing of Seating Area (1) prior to Casting Blinding Co
"Inspection for application of Protection Layer of Geo-Textile Sheet on top of Bituminous Damp Proofing
Installation of Rock and Boulder No. RB-313 (2nd Layer)
Stack Boulders wall & Check Top level & Coordinate for Layer 1 & Layer 2 Installed at Water Play Gar
Inspection for Excavation of Open Channel CH-2 (From ST-19.81 to ST-106.00) Bed and Slope, prior to
Concrete Pouring for Central Bridge Pier Foundation (as Highlighted)
Steel Reinforcement for Central Bridge Pier Foundation (as Highlighted)
Concrete Pouring for Foundation of Bridge to South Tower (as Highlighted)
Steel Reinforcement for Foundation of Bridge to South Tower (as Highlighted)
Steel Reinforcement for Foundation of South Small Mosque (as Highlighted)
Cocnrete Pouring for Foundation of South Small Mosque (as Highlighted)
Notification to start control Joint Repair work for Boundary wall at Maze Garden, (19 Joints) (Outer Fac
Surface preparation prior to Install Crazy cut Riyadh stone cladding at Boundary wall (Outer face) @ M
Final Coat cementitious water proofing for Boundary wall @ Span 67C, 68A, 68B & 69 (Inner face) As pe
Second Coat cementitious water proofing prior to apply Final coat for Boundary wall @ Span 67C, 68A,
First Coat cementitious water proofing prior to apply second coat for Boundary wall @ Span 67C, 68A,
Inspection of Formwork for the Foundation and Kicker of Wall for Picnic Area (1) at Zone-I (PA-4,5,6 ) A
Inspection of Steel Reinforcement for the Foundation and Wall of Picnic Area (1) at Zone-I (PA-4,5,6 ) A
Inspection of concrete pouring for the foundation of Prayer Area at Zone-B (as Highlighted)
Installation of pipe and fittings for foul water drainage lifting line as per approved shop drawing (d
Installation of sleeve PVC conduit 50mm (1Pc.) for Barrier Gate Control at Ticket Booth 3A ground flo
Coordinates & Top level of Blinding for Boundary wall foundation @ EXC4-29/30 to EXC4-41/42 at Physi
Installation of earthing clamps with conductor 70mm (2pcs.) for earthing reinforcement steel re-bar
Installation of stub-up PVC conduit 32mm² (2Pcs.) for grounding at Ticket Booth 3A ground floor leve
Installation of sleeve PVC conduit 160mm (1Pc.) for LV incoming Power Supply at Ticket Booth 3A gro
Excavation for Boundary wall foundation @ EXC4-29/30 to EXC4-41/42 at Physic Garden at highlighted a
Installation of sleeve PVC conduit 50mm (1Pc.) for Barrier Gate Control at Ticket Booth 4A ground flo
Installation of earthing clamps with conductor 70mm (2pcs.) for earthing reinforcement steel re-bar
Coordinates & Top level for Footing's for Picnic Area PA1-07 & 08, as highlighted in attached Drawing's.
Installation of stub-up PVC conduit 32mm² (2Pcs.) for grounding at Ticket Booth 4A ground floor leve
Installation of sleeve PVC conduit 160mm (1Pc.) for LV incoming Power Supply at Ticket Booth 4A gro
Steel Reinforcement & Shuttering for Footing & Kicker (Pedestal) for Picnic Area PA1-07 & 08, as highli
Installation of stub-up PVC conduit 75mm for Low Current System Junction Box at the Ticket Booth #
Installation of stub-up PVC conduit 75mm for Low Current System Junction Box at the Ticket Booth #
Inspection of formwork for the foundation of Prayer Area at Zone-B (as Highlighted)
Inspection of form work and level for the 2nd part of Wall for Prayer Area at Zone-J (as Highlighted)
Installation of stub-up PVC conduit 75mm for Low Current System Junction Box at the Ticket Booth #
Installation of sleeve PVC conduit 50mm (1Pc.) for Barrier Gate Control at Ticket Booth 5A ground flo
Installation of earthing clamps with conductor 70mm (2pcs.) for earthing reinforcement steel re-bar
Installation of stub-up PVC conduit 32mm² (2Pcs.) for grounding at Ticket Booth 5A ground floor leve
Installation of sleeve PVC conduit 160mm (1Pc.) for LV incoming Power Supply at Ticket Booth 5A gro
Inspection for Sand Bedding Under Upvc Pipe (Class 5- Ø315M) for Foul Water Drainge Lifting Line fr
Excavation & surface preparation prior to sub base under stack boulder, At highlighted area in attach
Excavation & surface preparation prior to sub base under stack boulder @ 2 planted beds @ water play
Excavation & surface preparation for Lake @ Mist Garden, At highlighted area in attached drawings
Second coat Damp proofing for Boundary wall (Inner Face) @ Span 68A, 68B, 67C & 69.
First coat Damp proofing for Boundary wall (Inner Face) @ Span 68A, 68B, 67C & 69.
Primer coat Damp proofing for Boundary wall (Inner Face) @ Span 68A, 68B, 67C & 69.
Surface Preparation prior to apply primer coat Damp proofing for Boundary wall (Inner Face) @ Span 68
Steel Reinforcement & Shutter for Stiffner, Lintel for Door opening (level = 2.10m), Sill level for wi
Concrete pouring for Slab on Grade at Grid 3-5/R-X as Highlighted in attached Drawing's.
Inspection of 1st layers Block Layout at grid between 1-2/F-I (Toilets & shower) and between grid 6-
Second coat Damp proofing for Boundary wall Outer Face at Discovery Garden, As per attached highligh
First coat Damp proofing for Boundary wall Outer Face at Discovery Garden, As per attached highlighted
Primer coat Damp proofing for Boundary wall Outer Face at Discovery Garden, As per attached highligh
Surface Preparation prior to apply primer coat Damp proofing for Boundary wall Outer Face at Discover
Surface Preperation for Top of Sub-Base prior to casting the blinding concrete under Footing of Seating
Location, Level and Form works for Retaining wall Foundation at Axis AN to AP - INNER
Location, Level and Form works for Retaining wall at Axis AP to AR
Surface Preperation for Top of Sub-Base prior to casting the blinding concrete under Footing of Seating
Excavation and Surface Preperation prior to start backfilling Sub-Base under Footing of Seating Area (3)
Installation of stub-up PVC conduit 75mm for Low Current System Junction Box at the Ticket Booth #
Excavation and Surface Preperation prior to start backfilling Sub-Base under Footing of Seating Area (2)
Inspection for Mock up sample of Stone Layout for the Wing Wall of the Culverts at Western Wadi (as H
Installation of Rock and Boulder No. RB-248 (Full Boulder - 3 Layers)
Installation of Rock and Boulder No. RB-061 (3rd Layer)
Inspection for Cementitious water proofing (3rd Coat) for the Wing Wall of the Culverts at Western Wadi
Inspection for Cementitious water proofing (2nd Coat) for the Wing Wall of the Culverts at Western Wad
Inspection of Steel Reinforcement for the foundation of Prayer Area at Zone-B (as Highlighted)
"Inspection for application of Protection Layer of Geo-Textile Sheet on top of Bituminous Damp Proofing
Inspection for application of Bituminous Damp Proofing (2nd Coat) on top of Primer at Picnic Area (1) at
Inspection for application of Bituminous Damp Proofing (1st Coat) on top of Primer at Picnic Area (1) at
"Inspection for application of Base Primer Coating (50%x50% Water Damp prof) on Top of Blinding concre
Inspection for Casting the Blinding Concrete under the Foundation of Picnic Area (1) at Zone-I (PA-12 to
Inspection for Application of Anti-Termite prior to Casting Blinding Concrete at Picnic Area (1) - Zone-I
Installation of PVC Conduit 75mm Dia. Nema TC2 (stub-up with straignt conduit -4pcs.) for Lighting
Coordinates & Top level of Blinding for Boundary wall foundation @ EXC4-11/12 to EXC4-27/28 at Phy
Excavation for Boundary wall foundation @ EXC4-11/12 to EXC4-27/28 at Physic Garden at highlighte
Second coat Damp proofing for Boundary wall Outer Face, at Maze Garden, As per attached highlighted
First coat Damp proofing for Boundary wall Outer Face, at Maze Garden, As per attached highlighted Dr
Primer coat Damp proofing for Boundary wall Outer Face, at Maze Garden, As per attached highlighted
Surface Preparation prior to apply primer coat Damp proofing for Boundary wall Outer Face, at Maze G
Final Coat cementitious water proofing at Boundary wall (Outer face) @ Maze Garden, As per attached
Second Coat cementitious water proofing at Boundary wall (Outer face) @ Maze Garden, As per attache
First Coat cementitious water proofing at Boundary wall (Outer face) @ Maze Garden, As per attached
Stack Boulders Installed & Top level with Coordinate for 5th layer at Boat Garden, at highlighted area
Surface preparation Prior to install Riyadh Stone cladding for Boundary wall @ Span 67C, 68A, 68B & 69
Concrete Top level for Slab on Grade at Grid 3-5/R-X as Highlighted in attached Drawing's.
Installation of Weatherproof Box and PVC conduit (stub-up 32mm 1pc. & straight-20mm 1pc.) for
Installation of Weatherproof Box(2pcs.) and straight PVC conduit 20mm (1pcs.) each column fo
Installation of Weatherproof Box and PVC conduit (stub-up 32mm 1pc. & straight-20mm 1pc.) in C
Installation of Weatherproof Box(2pcs.) and straight PVC conduit 20mm (1pcs.) each column fo
Steel Reinforcement for Slab on Grade at Grid 3-5/R-X as Highlighted in attached Drawing's.
Final Coat cementitious water proofing for Boundary wall (Outer face) @ Discovery Garden, As per atta
Second Coat cementitious water proofing for Boundary wall (Outer face) @ Discovery Garden, As per at
First Coat cementitious water proofing for Boundary wall (Outer face) @ Discovery Garden, As per atta
Notification to start Excavation for Storm Water Drainge (As Highlighted)
Inspection for Formwork and Level Prior to Cast the Concrete for Foundation and Kicker of SBC-01 (Part
Notification to Start Excavation Site Fire & Scurity Distribution Route (As Highlighted)
Notification to Start Excavation for SiteTelecommunication Distribution Route (As Highlighted)
Installation of Rock and Boulder No. RB-236 (Full Boulder)
Installation of Rock and Boulder No. RB-316 (Full Boulder - 3 Layers)
Installation of Rock and Boulder No. RB-142 (4th Layer)
Installation of Rock and Boulder No. RB-261 (Full Boulder - 3Layers)
Inspection for Installation of Protection Layer of Geo-Textile Sheet on top of Bituminous Damp Proofing
Inspection for application of Bituminous Damp Proofing (2nd Coat) on top of Primer at Picnic Area (1) at
Inspection for application of Bituminous Damp Proofing (1st Coat) on top of Primer at Picnic Area (1) at
Inspection for application of Base Primer Coating (50%x50% Water Damp prof) on Top of Blinding concrete
Installation of subsurface drainage main line pipes (upvc class 4) as per high lighted attached appro
Installation of Weatherproof Box(2pcs.) and straight PVC conduit 20mm (1pcs.) each column for
Installation of Weatherproof Box(2pcs.) and straight PVC conduit 20mm (1pcs.) each column for
Notification to start Removal of Stone Boulders and Survey Bench marks due to conflict with the C
Soil Surface preparation prior backfilling between PC 160-162.
Location, Level & Formworks for Strip Footing between PC 197-199 & 198-200.
Concreting for Strip Footing between PC 197-199 & 198-200 (C-32/40 Very Severe).
Notification to start Removal of existing Boulders done by the old Contractor (Phase-2) for boulder No.
Notification to start Removal of existing Boulders done by the old Contractor (Phase-2) for boulder No.
Steel Reinforcement & Shuttering for Grade beam at Grid 3-5/R, 3-5/X & 3/R-X as Highlighted in attache
Concrete Pouring for Grade beam at Grid 3-5/R, 3-5/X & 3/R-X as Highlighted in attached Drawing's.
"Shutter Alignment & Top level for Grade beam concrete at Grid 3-5/R, 3-5/X & 3/R-X as Highlighted in
Co-ordinates & Top level of Footing at New Ticket booth # 3.
Anti Termite Treatement for Base Prior to blinding concrete of boundary wall @ span 14, 15, 16 & 17 a
Concrete pouring for blinding of boundary wall @ span 14, 15, 16 & 17 at Water Garden.
Probing & Grouting works at zone-G,Plantation shade area (78 points)
Inspection of coordinate prior to probing works at zone-G,Plantation shade area(78 points)
Inspection of coordinate prior to probing works at MCPE Tunnel & slab zone-1 crescent (16 points)
Probing & Grouting works at MCPE Tunnel & slab zone-1 crescent overall (16 points)
First Coat cementitious water proofing prior to apply second coat at Boundary wall (Inner face) @ Sp
Concrete Pouring for Column's @ C59, C60A, C60B, C61A, C61B, C61C, C62B, C63, C64, C67B, C67C,
Inspection to check 50mm protection screed below retaining wall foundation between axis AP to AH.
Inspection to check protection layer of geo-textile sheet below retaining wall foundation between axis
Inspection to check 2 layers of 4 mm thick modified bituminious water proofing membrane below retai
Inspection to check solvent base primer coating below retaining wall foundation between axis AP to AH.
Installation of Rock and Boulder No. RB-072 (3rd Layer).
Excavation under Footing of Seating Area (1) (SA-7) until level (-0.85) from FFL, prior to Casting Blindin
Soil Preperation under footing of seating Area (1) (SA-7) - As Highlighted
Soil Preperation under footing of Seating Area (1) (SA-9) prior to start backfilling Sub-Base up to the bo
Excavation levels & Coordinates for Sub-Surface Pipes at Maze Garden as per highlighted area in att
Second Coat Damp proofing at Boundary Wall Span 56, 57, 58, 59, 60 & 61A, Inner Face, (As Highlighted
First Coat Damp proofing prior to apply Second Coat at Boundary Wall Span 56, 57, 58, 59, 60 & 61A, In
Primer Coat Damp proofing prior to apply Fisrt Coat at Boundary Wall Span 56, 57, 58, 59, 60 & 61A, Inn
Final Coat cementitious water proofing at Boundary wall (Inner face) @ Span 56, 57 & 58 As per attach
Second Coat cementitious water proofing prior to apply Final coat at Boundary wall (Inner face) @ Spa
Installation of Rock and Boulder No. RB-284 (3rd Layer)
Installation of Rock and Boulder No. RB-272 (Full Boulder - 3 Layers)
Inspection of Steel Reinforcement for the Foundation and Side Walls of SBC-01 (Part-A) As Highlighted
Soil Preperation under Boulder No. RB-238
Soil Preperation under Boulder No. RB-068
Soil Preperation under Boulder No. RB-067
Soil Preperation under Boulder No. RB-065
Excavation and Surface Preparation prior to Backfilling for FW-Force Line at zone 5A (as highlighted f
Concreting for Strip Footing between PC 101 to 103 (C-32/40 Very Severe).
Reinforcement Steel for Strip Footing between PC 101 to 103.
Location, Level and Formworks for Strip Footing between PC 101 to 103.
Intallation of Pipe and Fittings for Foul Water Dranaige Lifting Line as per approved Shop drawings (De
Excavation & Surface Preparation before Installation of 1st Line of Stack Boulders at Geyser Garden, a
Gravel 3/8 & Bedding Geotextile Surround for Sub-Surface Drainage Pipes @ Sound & light Garden, as
Inspection for Formwork and Level Prior to Cast the Concrete for Top Slab of SBC-03.
Installation of Rock and Boulder RB-062 (First Layer).
Inspection for Casting the Blinding Concrete under the Foundation of Picnic Area (1) at Zone-I (PA-1,2,3
Soil Preperation under Boulder No. RB-149
"Inspection of Concrete Pouring for Foundation and Kicker of SBC-02 (Part-4) As Highlighted"
Installation of Rock and Boulder No. RB-247 (3rd Layer)
Inspection for Cementitious water proofing for the Wing Wall of the Culverts at Western Wadi (as Highl
Installation of Pipe and Fittings for Foul Water Drainage lifting line as per approved shop drawing (de
Inspection for application of anti-Termite Control under blinding concrete of Picnic Area (1) 1,2,3,9,10,1
Installation of Rock and Boulder No. RB-313 (First Layer)
Inspection to check concreting C(32-40)for retaining wall kicker between axis AP to AR
Inspection to check Reinforcement of retaining wall kicker between axis AP to AR
Inspection to Check level,location & formwork of retaining wall kicker between axis AP to AR.
"Concrete pouring for Blinding below S.O.G & Grade beam at Grid 3-5/R-X as Highlighted in attached
Coordinates & Top level of blinding concrete for boundary wall @ span 14, 15, 16 & 17 with Levels
Coordinates & top level of footing at new ticket booth # 7
Installation of Rock and Boulder No. RB-294 (1st Layer)
Inspection of Steel Reinforcement for the Foundation and Side Walls of SBC-02 (Part-4) As Highlighted
Inspection for Formwork and Level Prior to Cast the Concrete for Foundation and Kicker of SBC-02 (Part
Inspection for application of Primer Coat of Waterproofing for Top of Blinding concrete at Prayer Area
Inspection for application of Bituminous Damp Proofing (2nd Coat) on top of Primer at Prayer Area Zone
Surface preparation Boundary wall Prior to install Riyadh Stone cladding for Inner & Outer face @ Sp
Notification to start Excavation inside Physic Garden at highlighted area in attached Drawing's.
"Inspection of Control Joint Repair at Maze Garden, (13 no's of Joints) As per attached Drawing's."
Surface preparation prior to apply primer coat of Damp proofing for Wall @ Span 56, 57, 58, 59, 60 &
Inspectio of Structural Repair for Expansion joint & Entrance at Maze Garden, (0.72 m3) As per attac
Installation of sleeve PVC conduit 160mm (1Pc.) for LV incoming Power Supply at Ticket Booth 6A gro
Installation of sleeve PVC conduit 160mm (1Pc.) for LV incoming Power Supply at Ticket Booth 7A gro
Installation of sleeve PVC conduit 50mm (1Pc.) for Barrier Gate Control at Ticket Booth 6A ground flo
Installation of sleeve PVC conduit 50mm (1Pc.) for Barrier Gate Control at Ticket Booth 7A ground flo
Installation of stub-up PVC conduit 32mm (2Pcs) for grounding at Ticket Booth 7A ground floor level
Inspection to check surface preparation prior to water proofing below retaining wall foundation betwee
Inspection to check 50mm protection screed below south bridge foundation
Inspection to check protection layer of geo-textile sheet below south bridge foundation
Inspection to check two water proofing membrane below south bridge foundation
Inspection to check solvent base primer coating below south bridge foundation
Inspection to check surface preparation prior to water proofing below south bridge foundation
Installation of stub-up PVC conduit 75mm for Low Current System Junction Box at the Ticket Booth #
Installation of earthing clamps with conductor 70mm for earthing reinforcement steel re-bar at Tick
Installation of earthing clamps with conductor 70mm for earthing reinforcement steel re-bar at Tick
Installation of sleeve PVC conduit 75mm (3 pcs.) for Lighting underneath of Stone Boulder at the Wa
Inspection for application of Bituminous Damp Proofing (1st Coat) on top of Primer at Prayer Area Zone-
Installation of Rock and Boulder No. RB-300 (First Layer)
Installation of stub-up PVC conduit 32mm² (2Pcs.) for grounding at Ticket Booth 6A ground floor leve
Installation of Rock Boulder No. RB-294 (1st Layer)
Excavation & Surface Preparation for foundation of boundary wall @ span 14, 15, 16 & 17 with Levels
"Top Level of Sub Base Under Stack Boulders at Water Play Garden with Levels & Coordinates, at highlig
"Top level for Blinding Concrete below S.O.G & Grade beam at Grid 3-5/R-X as Highlighted in attached
Anti Termite Treatement prior to Blinding Concrete below S.O.G & Grade beam at Grid 3-5/R-X as Highl
Stack Boulders wall Installed & Check Top level & Coordinate for 3rd & 4th layer at Boat Garden, at hig
Steel Reinforcement for Pedestal Beam at New Ticket booths # 6 & 7, at Highlighted area in attached dr
Steel Reinforcement for Footing & Pedestal Beam at New Ticket booths # 4 & 5, at Highlighted area in a
Surface preparation for Excavation for Boundary Wall foundation at Physic Garden at highlighted area i
Anti Termite for Base prior to blinding for Boundary Wall foundation at Physic Garden at highlighted ar
Notification to start Structural Repair for Expansion joint & Entrance at Maze Garden, (0.72 m3) As per
"Notification to start Control Joint Repair at Maze Garden, (13 no's of Joints) As per attached Drawing's.
"Surface Preparation prior to Install Stack Boulders with Level & Coordinates, at highlighted area's in
Concrete Pouring for Window bottom sill, Door Lintels and 4 no's of Stiffner column for walls at Grid 3-6
Installation of Rock Boulder No. RB - 060 (1st Layer)
Inspection of Concrete Pouring for the 1st part of Wall for Prayer Area at Zone-J (as Highlighted)
Installation of Rock and Boulder No. RB-062 (First Layer)
Inspection of form work and level for the 1st part of Wall for Prayer Area at Zone-J (as Highlighted)
Co-ordinates & Top level of Footing at New Ticket booths # 4 & 5.
Co-ordinates & Top level of Pedestal Beam at New Ticket booths # 6 & 7.
Top of blinding for Boundary Wall at Physic Garden at highlighted area in attached Drawing's
Top level for Window sill, Door Oppening bottom and 4 no's of Stiffner column for walls at Grid 3-6/A, 3-
Shuttering for Window bottom sill, Door Lintels and 4 no's of Stiffner column for walls at Grid 3-6/A, 3-6
Inspection of 6 layers Block Work & Untill window Sill bottom at Grid 9-10/B, 10/B, 10/F-Q, 10-15/F,
Inspection of 9 layers Block Work upto lintel excluding place for window level at Grid 3-6/A, 3-6/E, 4/
Soil Preparation under Boulder No. RB-150
Inspection for Casting the Blinding Concrete under the Foundation of Picnic Area (1) at Zone-I (PA-01 to
Inspection for Application of Anti-Termite prior to Casting Blinding Concrete at Picnic Area (1) - Zone-I
Inspection to check protection screed below foundation of south small mosque .
Inspection to check protection layer of geo-textile sheet below foundation of south small mosque .
Inspection to check two coat of bituminious damp proofing coating below foundation of south small mo
Inspection to check solvent base primer coating below foundation of south small mosque .
Inspection to check surface preparation prior to water proofing below foundation of south small mosqu
Inspection to check blinding Concrete SRC,C(16-20 ) for South bridge foundation.
Inspection to check Anti termite prior to blinding concrete for South bridge foundation.
Installation of Rock and Boulder No. RB-285 (First Layer)
Installation of Rock and Boulder No. RB-317 (First Layer)
Installation of Rock and Boulder No. RB-293 (2nd Layer)
Inspection to Check level,location & formwork for blinding concrete for South bridge foundation.
Installation of Rock and Boulder No. RB-316 (2nd Layer)
Installation of PVC conduit sleeves for CCTV System of Column Boundary Wall top level at Column
Installation of earthing clamps with conductor 70mm (11pcs.) at the Butterfly Garden Structure Zone
Installation of earthing clamps with conductor 70mm (5pcs.) at the Discovery Garden Structure Zone
Installation of PVC conduit sleeve for (Power) CCTV System of Column Boundary Wall top level at
Inspection of Grouting for boulder no. RB 273 (full Boulder)
Inspection for Excavation of Open Channel CH-2 (From ST-19.81 to ST-106.00) Bed and Slope, prior to S
Inspection of Concrete Pouring for the 2nd part of Wall for Prayer Area at Zone-I (as Highlighted)
Inspection of Concrete Pouring for the Foundation and Kicker of SBC-02 (Part-2) As Highlighted
Inspection for Installation of Protection Layer of Geo-Textile Sheet on top of Bituminous Damp Proofing
Inspection for Installation of Protection Layer of Geo-Textile Sheet on top of Bituminous Damp Proofing
Stone cladding for Boundary wall Inner face, @ Span 71, 72 & 73 As per attached Drawings.
Stone cladding for Boundary wall Outer face, @ Span 37 & 38 As per attached Drawings.
Top of Sub Base and Top of blinding for Boundary Wall at Physic Garden at highlighted area in attached
Inspection to check concreting C(32-40)very severe for PC(183,184,185 & 186).
Inspection to check Reinforcement for PC(183,184,185 & 186)
Inspection to Check level,location & formwork for pile cap PC(183,184,185 & 186).
Probing & Grouting works at Zone-G,Energy Center-2 Foundation, Part-2(35 Points)
Installation of stub-up PVC conduit for Power (CCTV System) of Column Boundary Wall at Column nu
Installation of stub-up PVC conduit for CCTV System in Column Boundary Wall in Column number (C3
Mock-up sample inspection for Shingle Mulch near RB 079
Mock up of sample inspection for cobber mulch RB-080
Installation of Rock and Boulder No. RB-142 (3 Layer)
Co-ordinates & Top level of footing at New Ticket booths # 6.
Inspection for Application of Anti-Termite prior to Casting Blinding Concrete at Prayer Area (Zone-G) as
Inspection for Casting the Blinding Concrete under the Foundation of Prayer Area at Zone-G (As Highlig
Inspection of Steel Reinforcement for the Foundation and Side Walls of SBC-02 (Part-2) As Highlighted
Inspection for Formwork and Level Prior to Cast the Concrete for Foundation and Kicker of SBC-02 (Part
Steel Reinforcement for Column's @ C67B, C67C, C67D, C68A, C68B, & C69, at Boundary Wall.
Coordinates & Top Level for Column's @ C67B, C67C, C67D, C68A, C68B, & C69, at Boundary Wall.
Inspection to check Level, Alignment & Formwork for Retaining Wall foundation between axis AP to
Notification to Start Landscape & Stack Boulders at Geyser Garden, at highlighted area in attached Dr
Inspection for Cementitious water proofing for the Wing Wall of the Culverts at Western Wadi (as Highl
Installation of Weatherproof Box(2pcs.) and straight PVC conduit 20mm (1pcs.) each column for
Installation of Weatherproof Box(2pcs.) and straight PVC conduit 20mm (1pcs.) each column for
Installation of Rock and Boulder No. RB-140 (9 Layers)
Soil Preperation under Boulder No. RB-143
"Inspection for the Laying of RipRap at Strom Drainage Channel (From Chainage ST-400 to ST-500 ) as H
Installation of Rock and Boulder No. RB-237 (2nd Layer)
Installation of Stone cladding for Boundary wall Outer face, @ Span 39, 40 & 41 As per attached Drawing
Inspection of Control Joint Repair at Discovery Garden, (Inner & Outer Face of Boundary wall) As per at
Soil Preperation under Boulder No. RB-144
Surface Preperation and Structural repairing works Prior to start the Waterproofing at Culvert Wing Wal
"Inspection for backfilling behind the boundary wall at Plaza Area (As Highlighted)"
Notification to start backfilling behind the boundary wall at Zone 4A, Near Water Garden and Ticketing
Surface Prepration Prior of fixing Wall Cladding for Culvert wing walls
Inspection for application of Bituminous Damp Proofing (2nd Coat) on top of Primer at Prayer Area Zone
Inspection for application of Bituminous Damp Proofing (1st Coat) on top of Primer at Prayer Area Zone-
Inspection for application of Primer Coat of Waterproofing for Top of Blinding concrete at Prayer Area
Inspection for application of Bituminous Damp Proofing (2nd Coat) on top of Primer at Prayer Area Zone
Inspection for application of Bituminous Damp Proofing (1st Coat) on top of Primer at Prayer Area Zone-
Inspection to check protection layer of 4 mm thick bituminious protection board above PC(79.80,81,8
Inspection for application of Primer Coat of Waterproofing for Top of Blinding concrete at Prayer Area
Inspection to check single layer of 4 mm thick modified bituminious water proofing membrane above
Inspection to check solvent base primer coating above PC(79.80,81,82,195,196,197,198,199 & 200)
Inspection to check surface preparation prior to water proofing above PC(79.80,81,82,195,196,197,198
Inspection for Concrete Pouring for Foundation and kicker of SBC-02 (Part-3) As Highlighted
Installation of stub-up PVC conduit (Dia.-110mm-1 pc.) for Incoming Low Voltage Supply at Ticket Boot
Installation of PVC conduit for power at the ground floor slab level Ticket Booth # 6 as per highlight
Installation of PVC conduit for Security System at the ground floor slab level Ticket Booth # 6 as per
Installation of PVC conduit for Fire Alarm System at the ground floor slab level Ticket Booth # 6 as p
Installation of PVC conduit for Voice and Data System at the ground floor slab level Ticket Booth # 6
Installation of Rock and Boulder No. RB-110 (3rd Layer)
Installation of Rock and Boulder No. RB-074 (2nd Layer)
Excavation and Surface Preparation Prior to Backfilling For FW- Force Line at Zone 5A (as Highlighted fr
Installation of stub-up PVC conduit (Dia.-110mm-1 pc.) for Incoming Low Voltage Supply at Ticket Boo
Installation of Rock and Boulder No. RB-303 (1st Layer)
Installation of Rock and Boulder No. RB-072 (3rd Layer)
Installation of Rock and Boulder No. RB-166 (7 Layers)
Installation of Rock and Boulder No. RB-139 (11 Layers)
Inspection for First coat of cementitous water proofing for Boundary wall at Inner face, @ Span 23, 24,
Inspection for Final coat of cementitous water proofing for Boundary wall at Inner face, @ Span 23, 24,
Inspection for Second coat of cementitous water proofing for Boundary wall at Inner face, @ Span 23, 2
Installation of PVC conduit for Security System at the ground floor slab level Ticket Booth # 5 as per
Installation of PVC conduit for Fire Alarm System at the ground floor slab level Ticket Booth # 5 as p
Installation of PVC conduit for Voice and Data System at the ground floor slab level Ticket Booth # 5
Inspection re-installation of stub-up PVC conduit for CCTV System of Column Boundary Wall
Installation of stub-up PVC conduit (Dia.-110mm-1 pc.) for Incoming Low Voltage Supply at Ticket Boo
Installation of PVC conduit for power at the ground floor level Ticket Booth # 5 as per highlighted at
Inspection of re-installation stub-up PVC conduit for Power (CCTV System) of Column Bound
Inspection to check 25mm epoxy grout (Master seal 915) below PC(65,66,67,68,69,70,71 & 72) Crescen
Inspection to check 50mm protection screed below PC(65,66,67,68,69,70,71 & 72)Crescent-1, (151,152
Inspection to check protection layer of 4 mm thick bituminious protection board below PC(65,66,67,6
Inspection to check Protection layer of geotextile sheet below PC(65,66,67,68,69,70,71 & 72)Crescent
Inspection to check single layer of 4 mm thick modified bituminious water proofing membrane below
Inspection to check solvent base primer coating below PC(65,66,67,68,69,70,71 & 72)Crescent-1, (151
Inspection to check surface preparation prior to water proofing for PC(65,66,67,68,69,70,71 & 72)Cre
nstallation / Fixing of Kicker Formwork (H=150mm) for Ticketing Booth #2
Top level of Sub Base Under Stack Boulders, at highlighted area in attached Drawing's, at Water Play Ga
Coordinates & Top level of Column's @ C59, C60A, C60B, C61A & C65 at Boundary Wall.
Installation of PVC conduit for Low Current (Voice & Data) at the Maintenance Building Laboratory R
Soil Preperation under Boulder No. RB-321
Soil Preperation under Boulder No. RB-320
Soil Preperation under Boulder No. RB-322
Soil Preperation under Boulder No. RB-319
Inspection of form work and level for the 2nd part of Wall for Prayer Area at Zone-I (as Highlighted)
Installation of Rock and Boulder No. RB-082 (2nd Layer)
Installation of Rock and Boulder No. RB-246 (3rd Layer)
Stack Boulders Installed at Boat Garden 2 layers, at highlighted area in attached Drawing's,
Inspection of 9 layers Block Work at Grid 1-2/E, 1/I-R & 2/I-R, As highlighted in attached Drawings.
Installation of rock and boulder no. RB-316 (1st Layer)
Installation of rock and Boulder No. RB-315 (2nd layer)
Installation of PVC conduit for power at the ground floor level Ticket Booth # 4 as per highlighted at
Installation of PVC conduit for Security System at the ground floor level Ticket Booth # 4 as per high
Installation of PVC conduit for Fire Alarm System at the ground floor level Ticket Booth # 4 as per hi
Installation of PVC conduit for Voice and Data System at the ground floor level Ticket Booth # 4 as p
Inspection of Concrete Pouring for Side Walls and Top Slab of SBC-03
Installation of Rock and Boulder No. RB-061 (2nd Layer)
Installation of Rock and Boulder No. RB-250 (4th Layer)
Installation of Rock and Boulder No. RB-276 (2nd Layer)
Installation of Rock and Boulder No. RB-293 (1st Layer)
Installation of Rock and Boulder No. RB-284 (2nd Layer)
Surface preparation and Excavation prior to Start Installation of Stack Boulders at Water Play Garden, a
Probing & Grouting works at Zone-G,Energy Center-2 Foundation, Part-2(100 Points)
Primer Coat prior to apply Single Layer membrane water proofing at Retaining Wall Span 40 & 41, Inner
Protection Board for Expansion Joint of Retaining Wall Span 19, 20 & 21, at Boundary Wall (As Highlight
Inspection of coordinate prior to probing works at zone-G,Energy center-2 Foundation part-2 (100 po
Inspection of Second Layer of Water proofing Membrane at Expansion Joint of Retaining Wall Span 19,
Inspection of Clean from filler board and repair for Expansion Joint prior to apply Backing Rod, Single
Inspection of First Layer of Water proofing Membrane at Expansion Joint, Backing Rod and Sealent for
Installation of 75mm PVC Conduit & Junction Box for Low Current System at Ticket Booth#7A Ground
Installation of pipe and fittings for foul water drainage lifting line as per approved shop drawing (de
Reinforcement Inspection for Foundation and Side Walls of SBC-04
Inspection for Application of Anti-Termite prior to Casting Blinding Concrete at Prayer Area (Zone-B) as
Inspection for Application of Anti-Termite prior to Casting Blinding Concrete at Prayer Area (Zone-K) as
Inspection for Casting the Blinding Concrete under the Foundation of Prayer Area at Zone-B (As Highligh
Inspection for Casting the Blinding Concrete under the Foundation of Prayer Area at Zone-K (As Highligh
Concrete Pouring of footing & Pedestal Wall at New Ticket booths # 6 & 7.
Surface Preparation of Boundary wall of Discovery Garden Prior to Install Crazy Cut Stone Cladding (I
Inspection of 9 layers Block Work at Grid 1-2/A, 1/A-E & 2/A-E, As highlighted in attached Drawings.
Inspection of First layer block layout at Grid 1-2/E, 1/I-R & 2/I-R, As highlighted in attached Drawings.
Steel Reinforcement for Window bottom sill, Door Lintels and Stiffner column for walls at Grid 1-2/A, 3-
Inspection of First layer block layout at Grid 6-9/A, 9/A-B, 9-12/B, 10/B-E, 11/B-E, 10-12/D1, 10-12/E
Inspection to check blinding Concrete SRC,C(16-20 ) for South Small Mosque.
Inspection to check Anti termite under blinding concrete for South Small Mosque.
Inspection to Check level,location & formwork for blinding concrete of South Small Mosque.
Installation of Rock and Boulder RB-327 (full Boulder installation - 3 layers).
Notification to start installation of Stack Boulders at Water Play Garden at highlighted area in attach
Reinforcement Inspection for Top Slab of SBC-03.
Installation of Rock and Boulder RB-292 (2 layer).
Surface Preparation under the Footing of Picnic Area at zone I, prior to backfilling Sub-Base 150mm (1
Installation of Rock and Boulder RB-138 (4 layers).
Installation of Weatherproof Box(2pcs.) and straight PVC conduit 20mm (1pcs.) each column for CC
Installation of Weatherproof Box(2pcs.) and straight PVC conduit 20mm (1pcs.) each column for Po
Top level & Coordinates for Wall @ Span 67B, 67C & 68A, at Boundary Wall.
Excavation for Sub Surface Pipe at Buttrtfly Garden, at highlighted area in attached Drawing's. (160m
Inspection for Cut and removal of dispoasal materials near boundary wall at Zone B (As Highlighted)
"Notification to start backfilling behind the boundary wall at Plaza Area (As Highlighted)"
Surface Preperation for top of Sub-Base prior to casting the blinding concrete under foundation of Pray
Surface Preperation for top of Sub-Base prior to casting the blinding concrete under foundation of Pray
Surface Preperation for Top of Sub-Base prior to casting the blinding concrete under foundation of Pra
Inspection for Formwork and Level Prior to Cast the Concrete for Top Slab of SBC-03
Inspection for the laying of riprap at storm drainage channel (from step 1 to step 5) as highlighted
Surface Preperation prior to start backfilling behind the boundary wall at Zone-B (as Highlighted)
Installation of Rock and Boulder No. RB-272 (2nd Layer)
Installation of Rock and Boulder No. RB-243 (2nd Layer)
Surface Preparation of Retaining wall prior to apply Membrane Water proofing coat at Span 40 & 41, Inn
Concrete pouring for Kicker @ Span 67B, at Boundary Wall.
Concrete Pouring for Column's @ C66A, C66B & C67A,, at Boundary Wall.
Concrete Pouring for Wall @ Span 68B, at Boundary Wall.
Steel Reinforcement of footing & Pedestal Wall at New Ticket booths # 6 & 7.
Inspection for Cosmetic and Structure Repair at Wadi culvert wing wall (as Highlighted)
Inspection of Excavation for Picnic Area @ Zone-I (12 to 17) As Highlighted
Inspection to check concreting C(32-40)very severe for PC(199 & 200)
Inspection to check Reinforcement for PC(199 & 200)
Inspection to check concreting C(32-40)very severe for retaining wall foundation between Axis AP to AQ
Inspection to check Reinforcement for retaining wall foundation between Axis AP to AQ.
Inspection to Check level,location & formwork for pile cap PC(199 & 200).
Inspection to Check Top Rock level in south bridge foundation.
Inspection to Check level,Alignment & Formwork for retaining wall foundation between axis AP to AQ
Surface Preperation for under the Footing of Picnic Area at Zone I, prior to Backfilling Sub-Base 150mm
Excavation levels for Sub-Surface Pipes @ Sound & Light Garden as per highlighted area in attached
Installation of Rock and Boulder RB-073 (2nd & 3rd layer).
Co-ordinates & Top level of footing at New Ticket booths # 7.
Co-ordinates & Top level of footing at New Ticket booths # 6.
Inspection of Backfilling over pipe line for foul water drainage lifting line (as highlighted)
Surface Preperation of Sub-Base prior to casting the blinding concrete under foundationof Picnic Area at
Probing & Grouting works at Zone-G,Energy Center-2 Foundation, Part-2(100 Points)
Inspection of coordinate prior to probing works at zone-G,Energy center-2 Foundation part-2 (100 po
Inspection to check concreting C(32-40)very severe for Promenade bridge foundation.
Inspection to check Reinforcement of Promenade bridge foundation.
Inspection to check Concrete SRC,C(16-20 ) under TIP Footing foundation
Inspection to check Anti termite under TIP Footing foundation
Inspection to Check level,Location & Formwork for TIP Footing at crescent-2
Inspection to Check Excavation level for TIP Footing in crescent-2
Installation of earthing clamps with conductor 70mm (6pcs.) at the Maze Garden Structure Zone 5A a
Installation of direct buried PVC conduit 110 dia. for Low Current (Incoming Fire & Security Cables -
Inspection of formwork for the foundation of prayer area at zone-J (As Highlighted)
Inspection to Check level,location & Formwork for Promenade bridge foundation.
Inspection to Check level and location for Sixth layer of South small Mosque as highlighted
Inspection to Check level and location for Fourth layer of South small Mosque as highlighted
Inspection of Excavation for Picnic Area at Zone-I 1 to 11) as highlighted.
Installation of Rock Boulder RB-167 (8 layers).
Inspection of Single Layer Slated Membrane for Retaining Wall @ Span 42, 43, 44, 45, 46, 47 & 48, Inne
Surface Preparation of Boundary wall at Maze Garden, Prior to start Injection Epoxy Grout for 9 no's of
Inspection of Single Layer Slated Membrane for Retaining Wall @ Span 19, 20 & 21, Inner Face at Bound
Concrete pouring for Footing @ Span 67B, at Boundary Wall.
Steel Reinforcement & Concrete pouring for Corbel (Inner Face) @ Span 39 & 40, at Boundary Wall.
Top level for Corbel (Inner Face) @ Span 39 & 40, at Boundary Wall.
Excavation and Surface Preperation For FW- Force Line at Zone 5A (as Highlighted)
Inspection for Sandblasting of the Wing Wall of the Culverts at Western Wadi (as Highlighted)
Inspection of Mock up sample for Stone Cladding at Wadi Wall (As Highlighted)
Probing & Grouting works at Zone-2G,Energy Center-2, Part-2(100 Points)
Probing & Grouting works at Zone-G,Energy Center-2 Foundation, Part-2
Inspection to check single layer of 4 mm thick modified bituminious water proofing membrane below
Installation of Rock Boulder RB-072 (2nd layer).
Installation of Rock Boulder RB-247 (2nd layer).
Inspection for Final coat of cementitous water proofing for Boundary wall at Outer face, @ Span 23, 24,
Inspection for Second coat of cementitous water proofing for Boundary wall at Outer face, @ Span 23, 2
Inspection for First coat of cementitous water proofing for Boundary wall at Outer face, @ Span 23, 24,
Top level of Second Layer Stack Boulders Installation, at highlighted area in attached Drawing's, at Boa
Inspection for Sandblasting of the Wing Wall of the Culverts at Western Wadi (as highlighted).
Installation of Rock and Boulder No. RB-275 (2nd Layer)
Probing & Grouting works at Zone-G,Energy Center-2 Foundation, Part-2(100 Points)
Installation of Rock and Boulder No. RB-250 (3rd Layer)
Inspection for Cementitious water proofing for the Wing Wall of the Culverts at Western Wadi (as Highl
Concrete pouring for Corbel (Inner Face) @ Span 41, at Boundary Wall.
Surface Preparation for External face of Walls of Ticket booth # 1.
Surface Preparation for External face of Walls of Ticket booth # 2.
Inspection to check protection layer of 4 mm thick bituminious protection board for strip footing betwe
Inspection to check protection layer of geotextile sheet for strip footing between PC (99 to 101)
Inspection to check single layer of 4 mm thick modified bituminious water proofing membrane for str
Inspection to check solvent base primer coating for strip footing between PC(99 to 101)
Inspection to check surface preparation for strip footing between PC(99 to 101)
Inspection for Excavation for Sub-Surface Drainage Pipes at Aviary Garden as per attached Referenc
Excavation levels for Sub-Surface Pipes at Aviary Garden at highlighted area in the attached Drawing'
Installation of Rock and Boulder No. RB-264 (Full Boulder Installation - 4 Layers).
Installation of Rock and Boulder No. RB-061 (1st Layer).
Installation of Rock and Boulder No. RB-276 (1st Layer).
Inspection for Formwork and Level Prior to Cast the Concrete for Foundation and Kicker of SBC-02 (Par
Co-ordinates & Top level of Blindings prior to footing at New Ticket booths # 6 & 7.
Installation of Rock and Boulder No. RB-315 (1st Layer)
Surface Preparation prior of fixing wall cladding for culvert wing walls
Inspection of Concrete Pouring for Foundation and Kicker of SBC-02 (Part-1) As Highlighted
Inspection of Concrete Pouring for Foundation and Kicker of SBC-02 (Part-3) As Highlighted
Surface Preperation of Sub-Base prior to casting the blinding concrete under foundationof Prayer Area
Surface Preperation of Sub-Base prior to casting the blinding concrete under foundationof Prayer Area
Surface Preperation of Sub-Base prior to casting the blinding concrete under foundationof Prayer Area
Reinforcement Inspection for Top Slab of SBC-03
Inspection of Concrete Pouring for the foundation of Prayer Area at Zone-J (as Highlighted)
Inspection of form work for the 1st part of Wall for Prayer Area at Zone-I (as Highlighted)
Inspection of Concrete Pouring for the 1st part of Wall for Prayer Area at Zone-I (as Highlighted)
Installation of Rock and Boulder No. RB-060 (1st Layer)
Inspection to check Cementitious water proofing under retaining wall foundation between axis AQ to A
Inspection to check Protection layer of geotextile sheet under retaining wall foundation between axis A
Inspection to check single layer of 4 mm thick modified bituminious water proofing membrane under r
Inspection to check solvent base primer coating under retaining wall foundation between axis AQ to AP
Concrete Pouring for Wall @ Span 61B, at Boundary Wall.
Inspection to check surface preparation prior to water proofing under retaining wall foundation betwee
Top Level of Blinding for Water Fountain at Geyser Garden, as per attached Drawing's.
Anti Termite Treatement for base prior to Blinding of Water Fountain at Geyser Garden, as per attached
Inspection to check Mass Concrete SRC,C(16-20 )for strip footing between PC(195 to 197) & (196 to 198)
Primer Coat prior to apply Membrane Water proofing for Retaining Wall at Span 49A, 49B & 50A, Inner
Inspection to check Anti termite prior mass concrete of strip footing between PC(195 to 197) & (196 to
Inspection to Excavation Check level for retaining wall between axis AA to AP
Notification to Start Excavation for Sub Surface Pipe at Buttrtfly Garden, at highlighted area in attached
Excavation & Levels for Water Fountain at Geyser Garden, as per attached Drawing's.
Inspection to Check level, location and Formwork for mass concrete of Strip footing between PC(195 to
Steel Reinforcement for Column's @ C59, C60A, C60B, C61A, C61B, C61C, C62B, C63 & C64, at Boundary
Inspection to Check Excavation level of Strip footing between PC(195 to 197) & (196 to 198).
Coordinates & Top level for Column's @ C59, C60A, C60B, C61A, C61B, C61C, C62B, C63 & C64, at Bound
Inspection of coordinate prior to probing works at zone-G,Energy center-2 Foundation part-2 (100 po
Inspection of Excavation for picnic area in zone 1 (as highlighted)
Installation of Rock and Boulder No. RB-084 (4th Layer)
Sand bedding under sub- surface Drainage Pipes @ Aviary Garden, as per highlighted area in attache
Installation of Rock and Boulder No. RB-237 (2nd Layer)
Inspection of surface preparation for picnic area in zone 1 (as Highlighted)
Inspection for Formwork and Level Prior to Cast the Concrete for Foundation and Kicker of SBC-02 (Part
Inspection of Six layer block work at Grid 3-6/A, 3/A-E, 3-6/E, 4/A-E, & 5/A-E @ Management Building
Steel Reinforcement for Slab on Grade at Grid 6-7/D-I, 7-9/F-I, 9-10/B-I, 10-12/B-F, 12-13/E-F & 10/I
Inspection of First layer block layout at Grid 13/F-Q, 15/F-Q, 13-15/F, 13-15/H, 13-15/N, 13-15/Q,
Inspection of First layer block layout at Grid 1-2/A, 1/A-E, 2/A-E, 1/I-K, 2/I-K, 1/L-R & 2/L-R @ Manage
Concrete pouring for Slab on Grade at Grid 6-7/D-I, 7-9/F-I, 9-10/B-I, 10-12/B-F, 12-13/E-F & 10/I-Q a
Top level for Slab on Grade at Grid 6-7/D-I, 7-9/F-I, 9-10/B-I, 10-12/B-F, 12-13/E-F & 10/I-Q as Highli
Top level & Coordinates for Wall @ Span 67B, at Boundary Wall.
Top level & Coordinates for Wall @ Span 67C, 68A & 68B, at Boundary Wall.
Soil Preperation under Boulder No. RB-141
Soil Preperation under Boulder No. RB-071
Excavation and Surface Preperation For FW- Force Line at Zone 5A (as Highlighted)
Surface Preperation for Footing of Prayer Area at Zone-B prior to start backfilling Sub-Base 150mm
Surface Preperation for Footing of Prayer Area at Zone-g prior to start backfilling Sub-Base 150mm
Surface Preperation for Footing of Prayer Area at Zone-K prior to start backfilling Sub-Base 150mm
Inspection of Excavation for Footing of Prayer Area in Zone-B (as highlighted).
Inspection of Excavation for Footing of Prayer Area in Zone-G (As Highlighted)
Inspection of Excavation for Footing of Prayer Area in Zone-K (As Highlighted)
Inspection of Six Layer Block Work and Bottom Sill Level at Grid 12-18/B, 18/B-F, 13/B-E, 15/B-E, 15
Bottom level of Sub Base and Check Surface after Excavation at Stack Boulders at Boat Garden, as per h
Soil Preparation prior to Excavation to Install Stack Boulders at Water Play Garden, as per highlighted a
Notification to Start Installation of Stack Boulders at Water Play Garden, at highlighted area in attached
Top level of Sub Base Under Stack Boulders, at highlighted area in attached Drawing's, at Boat Garden
Probing & Grouting works at Zone-G,Energy Center-2 Foundation, Part-2(25 Points)
Probing & Grouting works at Zone-G,Energy Center-2 Foundation, Part-2(89 Points)
Probing & Grouting works at Zone-G,Energy Center-2 Foundation, Part-2(86 Points)
Notification to Start Excavation for Sub-Surface Pipe at Maze Garden excluded the area in which the
Inspection to Check level and location for Fifth layer of South small Mosque as highlighted
Inspection to Check level and location for Third layer of South small Mosque as highlighted
Installation of Rock and Boulder No. RB-080 (Full Boulder Installation - 4 Layers)
"Notification to start backfilling behind the boundary wall at Zone B (As Highlighted)"
Inspection of Steel Reinforcement for the foundation of Prayer Area at Zone-J (as Highlighted)
Inspection for initial cut, remove and backfill to -40from the final finish level at plaza area (from new
Notification to start backfill sub-base 2 layers upto -10 from the Final Finish Level @ Plaza Area (From
Inspection of Mock up sample for Crazy Cut at Plaza Area
Inspection of Mock up sample for Stone Edger at Plaza Area
Protection Board for Damp proofing on Boundary wall at Span 23, at Inner & Outer Face (at highlighted
Protection Layer of Geotextile on Blindings for New Ticket Booths # 3, 4, 5, 6 & 7, @ New Ticket Facility
Primer Coat Damp proofing on Blindings for New Ticket Booths # 3, 4, 5, 6 & 7, @ New Ticket Facility Ar
1st Coat Damp proofing on Blindings for New Ticket Booths # 3, 4, 5, 6 & 7, @ New Ticket Facility Area
2nd Coat Damp proofing on Blindings for New Ticket Booths # 3, 4, 5, 6 & 7, @ New Ticket Facility Area
Protection Board for Membrane at Retaining wall at Span 19, 20 & 21, at Inner Face (at highlighted area
Protection Board for Damp proofing on Boundary wall at Span 19, 20 & 21, at Outer Face (at highlighted
Primer Coat Damp proofing for Boundary wall prior to apply First coat Damp proofing at Span 24, 25. 26,
First Coat Damp proofing for Boundary wall prior to apply Second coat Damp proofing at Span 24, 25. 26
Second Coat Damp proofing for Boundary wall at Span 24, 25. 26, 27, 28, 29 & 30, at Inner & Outer Face
Top level for Corbel (Inner Face) @ Span 41, at Boundary Wall.
Steel Reinforcement for Corbel (Inner Face) @ Span 41, at Boundary Wall.
Inspection of coordinate prior to probing works at zone-G,Energy center-2 Foundation part-2 (25 poin
Inspection of coordinate prior to probing works at zone-G,Energy center-2 Foundation part-2 (89 poin
Inspection of coordinate prior to probing works at zone-G,Energy center-2 Foundation part-2 (86 poin
Inspection to check 25mm epoxy grout (Master seal 915) below PC(1,2,3,4,5,6,7 & 8)
Inspection to check 50mm protection screed below PC(1,2,3,4,5,6,7 & 8)
Inspection to check protection layer of 4 mm thick bituminious protection board below PC(1,2,3,4,5,6,7
Inspection to check Protection layer of geotextile sheet below PC(1,2,3,4,5,6,7 & 8)
Inspection to check single layer of 4 mm thick modified bituminious water proofing membrane below PC(
Inspection to check solvent base primer coating below PC(1,2,3,4,5,6,7 & 8)
Inspection to check surface preparation prior to water proofing below PC(1,2,3,4,5,6,7 & 8)
Installation of stub-up PVC conduit for Power (CCTV System) of Column Boundary Wall at Column nu
Installation of PVC conduit sleeves top level of Column Boundary Wall at Column number( C66-CA
Installation of stub-up PVC conduit for CCTV System of Column Boundary Wall at Column number (C
Installation of PVC conduit sleeves for CCTV System top level of Column Boundary Wall at Colum
Installation of rain water drainage pipe (upvc class 4) as per high lighted in the dwg.
Soil Preperation under Boulder No. RB-313
Steel Reinforcement for Wall @ Span 67B, at Boundary Wall.
Anti Termite Treatement for footing area Prior to Blinding concrete for New Ticket Booths # 3, 4, 5, 6 &
Steel Reinforcement for Wall @ Span 67C, 68A & 68B, at Boundary Wall.
Coordinates & Top level for Column's @ C66A, C66B & C67A, at Boundary Wall.
Concrete pouring of Blinding for New Ticket Booths # 3, 4, 5, 6 & 7, @ New Ticket Facility Area
Second Coat Damp proofing for Footing & Kicker of Boundary wall at Span 19, 20 & 21, at Outer Face (at
First Coat Damp proofing for Footing & Kicker of Boundary wall prior to apply Second coat Damp proofin
Primer Coat Damp proofing for Footing & Kicker of Boundary wall prior to apply First coat Damp proofin
Second Coat Damp proofing for Footing & Kicker of Boundary wall at Span 23, at Inner & Outer Face (at
First Coat Damp proofing for Footing & Kicker of Boundary wall prior to apply Second coat Damp proofin
Primer Coat Damp proofing for Footing & Kicker of Boundary wall prior to apply First coat Damp proofin
Top level of First line of Rock Boulders at Boat Garden, as per attached SCR & at highlighted area in Dra
Coordinates & Top level for Kicker @ Span 67B, at Boundary Wall.
Steel Reinforcement for Column's @ C66A, C66B & C67A,, at Boundary Wall.
Soil Preperation under Boulder No. RB-167 (as Highlighted)
Soil Preperation under Boulder No. RB-311
Soil Preperation under Boulder No. RB-323
Soil Preperation under Boulder No. RB-312
Inspection for Formwork and Level Prior to Cast the Concrete for Foundation and Kicker of SBC-02 (Part
Probing & Grouting works at Zone-G,Energy Center-2 Foundation, Part-2(100 Points)
Inspection of coordinate prior to probing works at zone-G,Energy center-2 Foundation part-2 (100 po
Soil preparation for Stack boulder at Boat Garden, As per Highlighted in attached Drawing.
Surface Preparation after Excavation at New Ticket Facility Area
Installation of Rock and Boulder No. 247 (1st Layer).
Inspection for Sandblasting of the Wing Wall of the Culverts at Western Wadi (as Highlighted).
Installation of PVC conduit sleeves for CCTV System top level of Column Boundary Wall at Co
Installation of PVC conduit sleeves top level of Column Boundary Wall at Column number (C60
Top level for S.O.G in Ticket booth # 3, As per attached Drawing's
Top level for S.O.G in Ticket booth # 2, As per attached Drawing's
Top level for S.O.G in Ticket booth # 1, As per attached Drawing's
Inspection for Final coat of cementitous water proofing for Boundary wall at Outer face, @ Span 41 As
Inspection for Second coat of cementitous water proofing for Boundary wall at Outer face, @ Span 41
Inspection for First coat of cementitous water proofing for Boundary wall at Outer face, @ Span 41 As
Second Coat Damp proofing for Boundary wall at Span 41, Outer Face (at highlighted area in the attach
First Coat Damp proofing for Boundary wall prior to apply Second coat Damp proofing at Span 41, Outer
Primer Coat Damp proofing for Boundary wall prior to apply First coat Damp proofing at Span 41, Outer
Surface Preparation of Boundary wall prior to apply Primer Damp proofing coat at Span 41, Outer Face (
Sand bedding under sub- surface Drainage Pipes @ Aviary Garden, as per highlighted area in attached D
Coordinates & Top level for Blindings of New Ticket booths # 3, 4 & 5 As per attached Drawing's
Coordinates & Top Level for Wall at Span 61B @ Boundary wall, as Highlighted in attached Drawing's
Shuttering & Concrete pouring for Grade Beam at Grid 10-13/F & 6/E-I as Highlighted in attached Dra
Installation of Rock and Boulder No. RB-275 (1st Layer)
Installation of stub-up PVC conduit for Lighting (Power-Dia.50mm 2pcs& Grounding - Dia.32mm 1pc.
Installation of stub-up PVC conduit for Power (CCTV System) of Column Boundary Wall at Column
Installation of stub-up PVC conduit for CCTV System of Column Boundary Wall at Column number
Probing & Grouting works at Zone-G,Energy Center-2 Foundation, Part-2(65 Points)
Inspection of coordinate prior to probing works at zone-G, Energy center-2 Foundation part-2 (35 Poi
Inspection of coordinate prior to probing works at zone-G,Energy center-2 Foundation part-2 (65 poin
Inspection of First Coat Cementitious Water proofing Prior to apply Second Coat T.O.K to I.G.L plus
Inspection of Second Coat Cementitious Water proofing Prior to apply Final Coat T.O.K to I.G.L plus
Inspection of Final Coat Cementitious Water proofing T.O.K to I.G.L plus 150mm for Boundary wall (
Surface Preparation of Wall Prior to install Riyadh Stone Cladding @ Span 19 to 32 (19, 20, 21, 22, 23,
Installation of Rock and Boulder No. RB-072 (2nd Layer)
Inspection for Filling and Sand Bedding for Foul Water Drainge Lifting Line (as Highlighted)
Inspection for Filling and Sand Bedding for Foul Water Drainge Lifting Line (as Highlighted)
Concrete pouring for S.O.G in Ticket booth # 3, As per attached Drawing's
Concrete pouring for S.O.G in Ticket booth # 2, As per attached Drawing's
Steel Reinforcement for S.O.G in Ticket booth # 3, As per attached Drawing's
Steel Reinforcement for S.O.G in Ticket booth # 2, As per attached Drawing's
Damp proofing board 4mm at footings for Ticket booth canopy @ Grid (A/1, 2, 3 & 4) (B/1, 2 & 3).
Inspection for First coat of cementitous water proofing for Boundary wall for Inner & Outer face, @ Sp
Inspection for Second coat of cementitous water proofing for Boundary wall for Inner & Outer face, @
Inspection for Final coat of cementitous water proofing for Boundary wall for Inner & Outer face, @ Sp
Surface Preparation prior to apply primer coat Damp proofing at Boundary Wall @ Span 23 Inner & Outer
Surface Preparation of Retaining wall prior to apply Damp proofing coat at Span 19, 20 & 21, Outer Face
Surface Preparation prior to apply primer coat Damp proofing at Boundary Wall @ Span 23, 24, 25, 26, 2
Shutter Alignment & Top level for Grade Beam at Grid 10-13/F & 6/E-I as Highlighted in attached Draw
Steel Reinforcement for Grade Beam at Grid 10-13/F & 6/E-I as Highlighted in attached Drawing, at M
Damp proofing Board 4mm for footings Inside Ticket booth # 7.
Concrete Pouring for Wall @ Span 62B & 63 at Boundary Wall.
Notification to Start Excavation for Sub-Surface Pipe at Maze Garden, Excluded the area in which ther
Excavation levels for Sub-Surface Pipes @ Sound & light Garden, as per highlighted area in attached Dra
Soil preparation for existing soil prior to install Boulders at Boat Garden, as per attached SCR & Drawing
Inspection for Concrete Pouring for Slab on Grade at Grid 10-12/Q-X, 12-13/Q and 10/I-Q Management
Inspection of concrete pouring for the foundation of Prayer Area at Zone-I (as Highlighted)
Installation of Rock and Boulder No. RB-110 (2nd Layer)
Probing & Grouting works at Zone-G,Energy Center-2 Foundation, Part-2(100 Points)
Inspection of coordinate prior to probing works at zone-G,Energy center-2 Foundation part-2 (100 Po
Inspection to check 25mm epoxy grout (Master seal 915) below PC(181,182,183,184,185 & 186)
Inspection to check 50mm protection screed below PC(181,182,183,184,185 & 186)
Inspection to check protection layer of 4 mm thick bituminious protection board below PC(181,182,183
Inspection to check Protection layer of geotextile sheet below PC(181,182,183,184,185 & 186)
Inspection to check single layer of 4 mm thick modified bituminious water proofing membrane below
Inspection to check solvent base primer coating below PC(181,182,183,184,185 & 186)
Inspection to check surface preparation prior to water proofing below PC(181,182,183,184,185 & 186)
Inspection to check Blinding Concrete SRC,C(16-20) for retaining wall between axis AQ to AP as highligh
Inspection to check Anti termite under blinding for retaining wall between axis AQ to AP as highlighted.
Inspection to Check level,Alignment & Formworkas prior to casting blinding under retaining wall footin
Co-ordinates & Top level of Blinding prior to footing at New Ticket booth # 6 & 7.
Co-ordinates for Excavation at New Ticket booth # 3, 4, 5, 6 & 7.
Top Level & Coordinates for Footing at Span 67B @ Boundary wall, as Highlighted in attached Drawing's
Top Level & Coordinates for Wall at Span 59, 60A, 60B, 61A, 62B & 63 @ Boundary wall, as Highlighted
Steel Reinforcement for Footing & Kicker @ Span 67B, at Boundary Wall.
Steel Reinforcement for Wall @ Span 61B, at Boundary Wall.
Steel Reinforcement for Wall @ Span 62B & 63, Prior to close shuttering at Boundary Wall.
Soil Preperation under Boulder No. RB-279
"Application of Anti-Termite prior to Casting Blinding Concrete at Cesspool#4 (as Highlighted)"
Installation of Rock and Boulder No. RB-082 (1st Layer)
Installation of Rock and Boulder No. RB-284 (1st Layer)
Installation of Rock and Boulder No. RB-250 (2nd Layer)
Inspection to check mass Concrete SRC,C(16-20) Third layer under Central bridge foundation as highligh
Inspection to Check level and location & Formwork before casting third layer mass concrete for central
Inspection of Steel Reinforcement for the foundation of Prayer Area at Zone-I (as Highlighted)
Inspection to Check level and location for fourth layer of South small Mosque
Installation of Rock and Boulder No. RB-247 (2nd Layer)
Inspection of formwork for the foundation of Prayer Area at Zone-I (as Highlighted)
"Application of Anti-Termite prior to Casting Blinding Concrete at Cesspool#5 (as Highlighted)"
Bed Preperation for Bottom, Slope and Berm of Open Channel - CH2 (as highlighted)
Steel Reinforcement of Slab on Grad at Security & Fire Control Building, at Highlighted area in attached
Concrete Pouring of Slab on Grad at Security & Fire Control Building, at Highlighted area in attached Dra
Installation of PVC conduit for Power (WS) at the Maintenance Building Laboratory Room grid line n
Second layer of water proofing Membrane at Expansion Joint of Retaining Wall @ Span 2, 3, 4, 5, 6, 7, 8,
Installation of PVC conduit for Low Current (Voice & Data) at the Maintenance Building Laboratory R
Inspection of Protection board for water proofing Membrane for Expansion Joint of Retaining Wall @ Span
Inspection of Single Layer Membrane for Retaining Wall @ Span 15, 16, 17 & 18, Inner Face at Boundary
Inspection of Protection board for Retaining Wall @ Span 15, 16, 17 & 18, Inner Face at Boundary Wall
Inspection of Single Layer Slated Membrane for Retaining Wall @ Span 15, 16, 17 & 18, Inner Face at B
Inspection of Single Layer Membrane for Retaining Wall @ Span 19, 20 & 21, Inner Face at Boundary Wal
Inspection for Concrete Pouring of Slab on Grade at Grid 1-2/A-E, 1-2/F-I
Concrete Pouring for Column's 4 no's, C48A, C49A, C49B & C50A @ Boundary wall, as Highlighted in at
Concrete Pouring of Blinding under S.O.G & Grade Beam @ Grid 6-7/D-I, 7-9/F-I, 9-10/B-I, 10-13/F at M
Inspection for steel reinforcement for Slab on Grade at Grid 10-12/Q-X, 12-13/Q and 10/I-Q
"Inspection for top level of Slab on Grade at Grid 10-12/Q-X, 12-13/Q and 10/I-Q"
Inspection for Excavation of Cesspool-4 & Cesspool-5
"Concrete Top Level of Slab On Grade at Grid 1-2 / A -E, 1 - 2 / F - I"
Concrete Pouring for Blinding of Duct Bank (as Highlighted)
Inspection of Steel Reinforcement for Slab On Grade at Grid 1-2 / A -E, 1 - 2 / F - I
Bottom Level of Stack Boulder at Boat Garden as Per attached Drawing
Inspection for Installation of Protection Layer of Geo-Textile Sheet on top of Bituminous Damp Proofing
Inspection for application of Bituminous Damp Proofing (2nd Coat) on top of Primer at Prayer Area Zone
Inspection for application of Bituminous Damp Proofing (1st Coat) on top of Primer at Prayer Area Zone-
Inspection for application of Primer Coat of Waterproofing for Top of Blinding concrete at Prayer Area Z
Installation of Rock and Boulder No. RB-084 (2nd & 3rd Layer)
Installation of Rock and Boulder No. RB-276 (1st Layer)
Installation of Rock and Boulder No. RB-249 (3rd Layer)
Installation of Rock and Boulder No. RB-248 (2nd Layer)
Inspection to check level, location & formworks for strip footing between PC 99 to 101.
Inspection to check concreting C(32-40)very severe for PC (195,196,197 & 198)
Inspection to check reinforcement for PC (195,196,197 & 198)
Inspection to Check level,Alignment & Formwork for PC (195,196,197 & 198)
Inspection to Check Rock level in (MCPE)
Inspection to check rock investigation under footing prior backfilling for(MCPE)
Anti Termite @ Grid 6-7/D-I, 7-9/F-I, 9-10/B-I, 10-13/F, Prior to Blinding of S.O.G & Grade Beam at Man
Surface Preparation for External wall at Maze Garden, Prior to start Repair works (Cracks, Expansio
Top level of Blinding under S.O.G & Grade Beam @ Grid 6-7/D-I, 7-9/F-I, 9-10/B-I, 10-13/F at Managemen
Shutter Alignment and Top level for Grade Beam @ Grid 10/F-Q, at Management Building, at highlighted
Inspection of Top level of sub-base layer Prior to Stack Boulder at Boat Garden, as per attached SCR & D
Excavation levels for Sub-Surface Pipes at Aviary Garden, At highlighted area in the attached Drawing's
Anti Termite Treatment for Canopy Footings below Blinding, 5 no's @ Grids B/4, 5, 6, 7 & 8) for Tickect
Shuttering & Concrete Pouring for Duct Bank at Management Building, at highlighted area in attached D
Excavation and surface preparation for FW-FOrce line at Zone 5A
Installation of Rock and Boulder No. RB-261 (2nd Layer)
Installation of Rock and Boulder No. RB-061 (1st Layer)
Top level & Coordinates for Wall at Span 66A & 66B @ Boundary wall, as Highlighted in attached Drawin
Concrete Pouring for Kicker at Span 61B @ Boundary wall, as Highlighted in attached Drawing's
Top level of Slab on Grad at Security & Fire Control Building, at Highlighted area in attached Drawing's.
Concrete Pouring for Column T.O.W to T.O.C @ C18, C19, C20, C40, C27A, C28, C29 & C30 at Boundary
Installation of Pipe and Fitting for foul water drainage Lifting line (as Highlighted)
Coordinates and Top level for Kicker Span 61B @ Boundary Wall.
Probing & Grouting works at Zone-G,Energy Center-2 Foundation, Part-2(62 Points)
Probing & Grouting works at Zone-G,Energy Center-2 Foundation, Part-2(45 Points)
Probing & Grouting works at Zone-G,Energy Center-2 Foundation, Part-2(99 Points)
Inspection to check 25mm epoxy grout (Master seal 915) below PC(187,188,189,190,191 & 192)
Inspection to check 50mm protection screed below PC(187,188,189,190,191 & 192)
Inspection to check protection layer of 4 mm thick bituminious protection board below PC(187,188,189
Inspection to check Protection layer of geotextile sheet below PC(187,188,189,190,191 & 192)
Inspection to check solvent base primer coating below PC(187,188,189,190,191 & 192)
Inspection to check surface preparation prior to water proofing below PC(187,188,189,190,191 & 192)
Concrete Pouring for Footing at Span 61B @ Boundary wall, as Highlighted in attached Drawing's
Top level for Blinding Concrete At Butterfly Garden, at Highlighted area in attached Drawing.
Shutter Alignment and Top level for Duct Bank at Management Building, at highlighted area in attached
Primer coat for retaining wall (Inner face) for Water proofing @ Span 19, 20 & 21, Boundary Wall, As p
Steel Reinforcement for Duct Bank at Management Building, at highlighted area in attached Drawing's.
Inspection of First Coat Cementitious Water proofing Prior to apply Second Coat T.O.K to I.G.L plus 1
Inspection of Second Coat Cementitious Water proofing Prior to apply Final Coat T.O.K to I.G.L plus 1
Inspection of Final Coat Cementitious Water proofing T.O.K to I.G.L plus 150mm for Boundary wall (Out
Concrete pouring for Grade Beam at Grid 10-12/B, 10-13/Q & 10-12/W as Highlighted in attached Draw
Concrete pouring for Grade Beam at Grid 1/A-E, 1/F-I, 2/A-E, 2/F-I, 1-2/A, E & F and 10/F-Q as Highlig
Reinforcement Inspection for the Foundation and Side Walls of SBC-02
Soil Preperation under Boulder No. RB-315
Installation of Rock and Boulder No. RB-243 (1st Layer)
Inspection of coordinate prior to probing works at zone-G, Energy Center-2 Foundation Part-2 (99 Poi
Installation of Rock and Boulder No. RB-167 (6 Layers).
Inspection for Excavation for FW- Force Line at Zone 5A
"Inspection for Casting the Blinding Concrete under Footing of Prayer Area at Zone-J"
Installation of Rock and Boulder No. RB-237 (1st Layer)
Installation of Rock and Boulder No. RB-073 (2nd Layer)
Installation of Rock and Boulder No. RB-080 (3rd Layer)
Installation of Rock and Boulder No. RB-074 (2nd Layer)
Inspection for Filling and Sanding Bedding for Foul Water Drainge Lifting Line (as Highlighted)
Surface Preperation prior to start backfilling for Slope and Berm of Open Channel (from ST-286.47 to ST-
Installation of Rock and Boulder No. RB-246 (2nd Layer)
Inspection of Skirting Slated Membrane Layer of 4mm thk Modified Bituminous Water Proofing at inner
Steel Reinforcement for Grade Beam at Grid 10-12/B, 10-13/Q & 10-12/W as Highlighted in attached
Inspection of Protection board for Retaining Wall @ Span 11, 12, 13 & 14 at Boundary Wall (Inner Face)
Surface Preparation of Wall Prior to install Riyadh Stone Cladding @ Span 19 to 32 (19, 20, 21, 22, 23,
Shutter Alignment and Top level for Grade Beam at Grid 10-12/B, 10-13/Q & 10-12/W as Highlighted i
Concrete Pouring for Wall at Span 66A & 66B @ Boundary wall, as Highlighted in attached Drawing's
Inspection for Excavation for Sub-Surface Drainage Pipes at Aviary Garden, as per attached Reference
Inspection of 2nd Coat Cementitious Water proofing Prior to apply Final Coat T.O.K to I.G.L plus 150m
Inspection of Final Coat Cementitious Water proofing T.O.K to I.G.L plus 150mm for Boundary wall (Out
Primer coat Damp proofing for retaining wall prior to apply First coat (Outer face) @ Span 19, 20 & 21
First coat Damp proofing for retaining wall prior to apply Second coat (Outer face) @ Span 19, 20 & 21
Second coat Damp proofing for retaining wall (Outer face) @ Span 19, 20 & 21, Boundary Wall, As per H
Inspection of First Coat Cementitious Water proofing Prior to apply Second Coat T.O.K to I.G.L plus 1
Inspection of Second Coat Cementitious Water proofing Prior to apply Final Coat T.O.K to I.G.L plus
Inspection of Final Coat Cementitious Water proofing T.O.K to I.G.L plus 150mm for Boundary wall (Ou
Installation of UPVC conduit Duct Bank for Low Voltage (Dia.-160mm 10pcs.-Sub-main cables ) at the
Installation of Rock and Boulders RB-250 (1st Layer).
Notification to start Excavation at Lake Mist Garden, with reference to attached Approved Section and
Installation of Rock and Boulder No. RB-272 (1st Layer)
Installation of Rock and Boulder No. RB-140 (9 Layers)
Soil Preparation Under Boulder No. RB-139
Soil Preparation Under Boulder No. RB-250 (1st Layer)
"Application of Anti-Termite prior to Casting Blinding Concrete at Prayer Area (Zone-J) as Highlighted"
Surface Preperation of Sub-Base prior to casting the blinding concrete under foundationof Prayer Area a
Installation of Rock and Boulder No. RB-292 (2nd Layer)
Inspection for Sandblasting of the Wing Wall of the Culverts at Western Wadi (as Highlighted)
Bed Preperation prior to start Backfilling behind the boundary wall @ Zone-4A & Zone-3B (as highlighte
Installation of Rock and Boulder No. RB-249 (2nd Layer)
Concrete Pouring for Footing at Span 67C, 68A & 68B @ Boundary wall, as Highlighted in attached Drawi
Concrete Pouring for Kicker at Span 67C, 68A & 68B @ Boundary wall, as Highlighted in attached Drawin
Inspection of bottom level of sub-base as per attached Section for Stack Boulder at Boat Garden
Shutter Alignment and Top level for Grade Beam at Grid 1/A-E, 1/F-I, 2/A-E, 2/F-I, 1-2/A, E & F and 10
Steel Reinforcement for Grade Beam at Grid 1/A-E, 1/F-I, 2/A-E, 2/F-I, 1-2/A, E & F and 10/F-Q as Hig
Coordinates and Top level for Kicker @ Span 61B, 62B & 63 at Boundary Wall.
Coordinates and Top level for Kicker @ Span 67C, 68A & 68B at Boundary Wall.
Coordinates and Top level for Footing's @ Span 67C, 68A & 68B at Boundary Wall.
Coordinates and Top level for Columns (4 no's) C48B, C49A, C49B & 50A at Boundary Wall (T.O.W to T.O
Steel Reingforcement for Footing & Kicker at Span 67C, 68A & 68B @ Boundary wall, as Highlighted in
Concrete Pouring for Column's T.O.W to T.O.C 4 no's @ C56, C57, C58 & C58A at Boundary Wall
Concrete Pouring of Blinding prior to S.O.G @ Ticket Booth # 3
Concrete Pouring for Kicker at Span 62B & 63 @ Boundary wall, as Highlighted in attached Drawing's
First Coat of Damp Proofing for Canopy Footings 7 no's @ Grids (A/1, 2, 3 & 4)(B/1, 2 & 3) for Tickect
Second Coat of Damp Proofing for Canopy Footings 7 no's @ Grids (A/1, 2, 3 & 4)(B/1, 2 & 3) for Tickec
Surface Preparation Prior to Start Damp Proofing for Footing Inside Ticket booth # 7 no's As highlighted
Primer Coat of Damp Proofing for Footing Inside Ticket booth # 7 no's As highlighted in attached Drawin
First Coat of Damp Proofing for Footing Inside Ticket booth # 7 no's As highlighted in attached Drawings
Second Coat of Damp Proofing for Footing Inside Ticket booth # 7 no's As highlighted in attached Drawin
Inspection to check concreting C(32-40)very severe for retaining wall Kicker between axis AV to till end
Inspection to check reinforcement of retaining wall Kicker between axis AV to till end (Outer side) as hig
Inspection to check concreting C(32-40)very severe for retaining wall Kicker between axis AV to till end (
Inspection to check reinforcement of retaining wall Kicker between axis AV to till end (Inner side) as hig
Inspection to check mass Concrete SRC,C(16-20) Second layer under Central bridge foundation as highli
Inspection to Check level,Alignment & Formworkas of retaining wall kicker after Axis AV (Inner & Outer)
Inspection to Check Excavation level under retaining wall between Axis AQ to AP as highlighted
Inspection to Check Level,Location & Formwork prior to casting mass concrete (Second layer) for Centra
Inspection to Check level and location third layer backfill in South small Mosque as highlighted.
Inspection of coordinate prior to probing works at zone-G, Energy center-2 Foundation part-2 (107 po
Inspection of coordinate prior to probing works at zone-G,Energy center-2 Foundation part-2 (100 po
Installation of direct buried PVC conduit 110 dia. for Low Current (Incoming Fire & Security Cables -
Installation of stub-up PVC conduit for CCTV System of Column Boundary Wall at Column number (6
Installation of PVC conduit sleeves for CCTV System top level of Column Boundary Wall at Column
Installation of stub-up PVC conduit for Power (CCTV System) of Column Boundary Wall at Column nu
Installation of PVC conduit sleeves top level of Column Boundary Wall at Column number( C48B-CA
Inspection of Mock-up for Riyadh Stone Cladding @ Boundary wall External face @ Maze Garden, As
Inspection for escavation for FW-Force Line at Zone 5D
Installation of Rock Boulder No. RB-111 (full boulder installation - 4 layers)
Inspection for Installation of protection layer of geotextile sheet on top of bituminous damp proofing
Application of bituminous damp proofing (1ST Coat) on top of primer at prayer area zone 1
Application of bituminous damp proofing (2nd Coat) on top of primer at prayer area zone 1
Application of Primer Coat of Water Proofing for top of blinding concrete at prayer area zone -1
Notification to Start Excavation for Sub-Surface Pipe at Aviary Garden, Excluded the area in which t
Top level for Blinding inside Ticket Booth 3.
Concrete Pouring for Footing at Span 62B & 63 at Boundary wall
Notification to Start Excavation for Cesspool-4 & Cesspool-5
Soil Preparation Under Boulder No. RB-317
Soil Preparation Under Boulder No. RB-316
Soil Preparation Under Boulder No. RB-303
Soil Preparation Under Boulder No. RB-302
Inspection to check level and location for Excavation of Tunnel 2.
Surface preparation of Retaining Wall prior to start Primer Coat Damp Proofing (Inner Face) at 19, 2
Surface preparation of retaining wall prior to apply Damp Proofing (Outer Face) Span 19, 20 & 21 at
Installation of stub-up PVC conduit (Dia.32mm) for CCTV System of Column Boundary Wall at Colu
Installation of stub-up PVC conduit (Dia.32mm) for Power (CCTV System) of Column Boundary Wall
Concrete Pouring for Grade Beam at Grid 6/Q-R, 5-6/R & 5-7/X, as Highlighted in attached Drawing, at
Inspection for Casting the blinding Concrete at storm box culvert - 04
Soil Preperation Under Foundation of Cesspool-4 & Cesspool-5
Concrete pouring for Wall at Span 59, 60A, 60B & 61A @ Boundary wall, as Highlighted in attached Draw
Top Level and coordinates for footing & kicker at span 61B @ boundary wall
Steel Reingforcement for Footing & Kicker at Span 61B @ Boundary wall, as Highlighted in attached Dra
Top Level & Coordinates for Footing & Kicker at Span 62B & 63 @ Boundary wall, as Highlighted in atta
Steel Reingforcement for Footing & Kicker at Span 62B & 63 @ Boundary wall, as Highlighted in attache
Inspection for First coat of cementitous water proofing for Boundary wall from kicker to I.G.L plus 15
Application of Membrane Single Layer on Boundary wall (inner face) 4 no's of Span 11, 12, 13 & 14 @ B
Inspection to check concreting C(32-40)very severe for strip footing between PC# 99 to 101
Inspection to check reinforcement for strip footing between PC# 99 to 101
Inspection to Check Level,Location & Formwork for strip footing between PC# 99 to 101
Inspection of coordinate prior to probing works at zone-G, Energy center-2 Foundation, Part-2
Installation of Rock and Boulder No. RB-327 (Full Boulder Installation - 3 Layers).
Installation of Rock and Boulder No. 247 (1st Layer).
Installation of Rock and Boulder No. RB-264 (Full Boulder Installation - 4 Layers).
Installation of Rock and Boulder No. 284 (Full Boulder Installation - 3 Layers).
Soil preparation for Stack boulder at Boat Garden, As per Highlighted in attached Drawing.
Surface preparation Boundary wall Prior to install Riyadh Stone cladding for Inner face @ Span 70, 7
Installation of Rock and Boulder No. RB-073 (1st Layer)
Installation of Rock and Boulder No. RB-261 (1st Layer)
Notification to start Excavation for FW- Force Line at Zone 4 & Zone 5
Installation of Rock and Boulder No. RB-072 (1st Layer)
Installation of Rock and Boulder No. RB-256 (Full Boulder Instalation - 3 Layers)
Installation of Rock and Boulder No. RB-083 (2nd Layer)
Inspection for Excavation for FW- Force Line at Zone 5D
Inspection of Second Coat of Damp Proofing for Blinding Concrete at Span 61B & 62B as per attached d
Inspection of First Coat prior to apply Second coat of Damp Proofing for Blinding Concrete at Span 61B
Concrete Pouring for S.O.G at Grid 6-7/Q-R & 5-7/R-X, as Highlighted in attached Drawing, at Managem
Inspection of Primer Coat prior to apply first coat of Damp Proofing for Blinding Concrete at Span 61B
Inspection of First Layer of Water Proofing membrane at Expansion Joint & Backing Rod of retaining wa
Inspection of Second Coat of Damp Proofing for retaining wall (Outer face) Span 31 & 32 @ Boundary W
Top level for Blinding under S.O.G & Grade Beam at Grid 1-2/A-E, 1-2/F-I & 10/F-Q, as Highlighted in
Surface preparation of retaining wall prior to start primer coat Damp proofing (Outer face) Span 31 &
Inspection of Primer Coat prior to apply first coat of Damp Proofing for retaining wall (Outer face) Sp
Inspection of First Coat prior to apply Second coat Damp proofing for retaining wall (Outer face) Span
Top Level for S.O.G at Grid 6-7/Q-R & 5-7/R-X, as Highlighted in attached Drawing, at Management Build
Steel Reinforcement for S.O.G at Grid 6-7/Q-R & 5-7/R-X, as Highlighted in attached Drawing, at Mana
Concrete Pouring for Blinding under S.O.G & Grade Beam at Grid 1-2/A-E, 1-2/F-I & 10/F-Q, as Highli
Steel Reingforcement for Wall at Span 66A & 66B @ Boundary wall, as Highlighted in attached Drawing'
Steel Reingforcement for Wall at Span 59, 60A, 60B & 61A @ Boundary wall, as Highlighted in attached
Top level & Coordinates for Wall at Span 49A, 49B & 50A @ Boundary wall, as Highlighted in attached D
Top level & Coordinates for Wall at Span 66A & 66B @ Boundary wall, as Highlighted in attached Drawin
Application of Anti Termite Prior to blinding of Grade Beam & S.O.G at Grid 1-2/A-E, 1-2/F-I & 10/F-Q
Inspection of Protection layer Geo-Textile Sheet for Blinding Concrete at Span 61B & 62B as per attache
Installation of Weatherproof Box(2pcs.) and straight PVC conduit 20mm (1pcs.) each column for
Installation of Weatherproof Box(2pcs.) and straight PVC conduit 20mm (1pcs.) each column fo
Inspection to check mass Concrete SRC,C(16-20) First layer under Central bridge foundation as highlight
Inspection to check Anti Termite prior to casting mass concrete of central bridge foundation as highligh
Inspection to Check Level,Location & Formwork prior to casting mass concrete (First layer) for Central
Installation of PVC conduit sleeves top level of Column Boundary Wall at Column number( C57-CAM
Installation of PVC conduit sleeves for CCTV System top level of Column Boundary Wall at Column
Notification to start excavation Site Telecommunication Distribution Route (as Highlighted)
Notification to start excavation Site fire & Security Distribution Route (as Highlighted)
"Application of Anti-Termite prior to Casting Blinding Concrete at Prayer Area (Zone-I) as Highlighted"
"Inspection for Casting the Blinding Concrete under Footing of Prayer Area at Zone-I"
Existing level for Wadi at Zone 5
Inspection for Final coat of cementitous water proofing for Boundary wall from kicker to I.G.L plus 1
Inspection for Second coat of cementitous water proofing for Boundary wall from kicker to I.G.L plus
Inspection for First coat of cementitous water proofing for Boundary wall from kicker to I.G.L plus 15
Inspection for External Plaster of Elevation @ Security & Fire Control Building.
Concrete Pouring for Kicker of Boundary Wall @ Span 66A & 66B, (Highlighted in the attached drawing's
Concrete Pouring for Footing of Boundary Wall @ Span 66A & 66B, (Highlighted in the attached drawing'
Steel Reingforcement for Grade Beam at Grid 6/Q-R, 5-6/R & 5-7/X, as Highlighted in attached Drawin
Concrete Pouring for Blinding Prior to Slab on Grade & Grade Beam at Grid 6-7/Q-R & 5-7/R-X, as High
Inspection of Protection board for Retaining Wall @ Span 2, 3, 4, 5, 6, 7, 8, 9 & 10 at Boundary Wall (Hi
Inspection to check single layer of 4mm thick modified Bituminious water proofing Membrane for Retaini
Steel Reingforcement for Ground Bearing Slab (S.O.G) for Ramps @ Toilet 2.
Top level & Shutter Alignment of Ground Bearing Slab (S.O.G) for Ramps @ Toilet 2.
Top level & Shutter Alignment for Grade Beam at Grid 6/Q-R, 5-6/R & 5-7/X, as Highlighted in attache
Soil Preparation under Boulder RB-294.
Inspection to check concreting C(32-40)very severe for retaining wall axis AT to AR (Inner side) as highli
Inspection to Check level, alignment and formwork of retaining wall axis AT to AR (inner) as highlighted.
Inspection to Check level and location second layer for South small Mosque as highlighted.
Installation of Rock and Boulder No. RB-111 (3rd Layer)
Installation of Rock and Boulder No. RB-142 (1st Layer)
Installation of Rock and Boulder No. RB-250 (1st Layer)
Installation of Rock and Boulder No. RB-074 (1st Layer)
Installation of Rock and Boulder No. RB-080 (2nd Layer)
Installation of Rock and Boulder No. RB-246 (1st Layer)
Soil Preparation under boulder No. RB-275
Soilr Preparation under Boulder No. RB-276
Soil Preparation under Boulder No. RB-300
Concrete Pouring for Kicker of Boundary Wall @ Span 59, 60A, 60B & 61A at Boundary Wall
Anti Termite Treatment Prior to blinding inside @ Ticket Booth # 2
Steel Reinforcement for S.O.G @ Ticket Booth # 1
Concrete Pouring for Footing of Boundary Wall @ Span 61A at Boundary Wall
Primer Coat for Canopy Footings 7 no's @ Grids (A/1, 2, 3 & 4)(B/1, 2 & 3) for Tickect booth canopy, As
Surface Preparation for Canopy Footings 7 no's @ Grids (A/1, 2, 3 & 4)(B/1, 2 & 3) for Tickect booth ca
Top level for blinding, inside ticketbooth #3
Coordinates & Top level of Column's for Boundary wall T.O.W to T.O.C @ C56, C57, C58 & C58A at Boun
Concrete Pouring of Blinding prior to S.O.G @ Ticket Booth # 2
Inspection to check backfill level second in South Small Mosque as highlighted.
Inspection to check 25mm epoxy grout (Master seal 915) below PC(193,194,195,196,197,198,199 & 200
Inspection to check 50mm protection screed below PC(193,194,195,196,197,198,199 & 200)
Inspection to check protection layer of 4 mm thick bituminious protection board below PC(193,194,19
Inspection to check Protection layer of geotextile sheet below PC(193,194,195,196,197,198,199 & 200)
Inspection to check single layer of 4 mm thick modified bituminious water proofing membrane below
Inspection to check solvent base primer coating below PC(193,194,195,196,197,198,199 & 200)
Inspection to check surface preparation prior to water proofing below PC(193,194,195,196,197,198,199
Coordinates and Top Level for Blinding of Boundary Wall at Span 61B & 62B at Boundary Wall.
Top level of Blinding at Security & Fire Control Building at highlighted in attached drawing.
Steel Reinforcement for Footing of Boundary Wall @ Span 61A at Boundary Wall
Steel Reinforcement for Kicker of Boundary Wall @ Span 59, 60A, 60B & 61A at Boundary Wall
Coordinates and level for Kicker of Boundary Wall @ Span 59, 60A, 60B & 61A at Boundary Wall
Surface Preperation for Prayer Area at Zone-I prior to Blinding Concrete
Concrete Pouring for the Foundation and Side Walls of SBC-03
Inspection for Final coat of cementitous water proofing for Boundary wall from kicker to I.G.L plus 1
Inspection for Second coat of cementitous water proofing for Boundary wall prior to Final coat from k
Coordinates and level for Blinding under Slab on Grade & Grade Beam at Grid 6-7/Q-R & 5-7/R-X, as H
Inspection for First coat of cementitous water proofing for Boundary wall prior to second coat from k
Concrete Pouring for blinding at Security & Fire Control Building, at Highlighted in attached Drawing.
Installation of stub-up PVC conduit for CCTV System of Column Boundary Wall at Span number
Installation of stub-up PVC conduit for Power (CCTV System) of Column Boundary Wall at Span
Inspection to check reinforcement of retaining wall Foundation between axis AT to AR (Inner side) as hi
Inspection to check concreting C(32-40)very severe for retaining wall Foundation between axis AV to till
Inspection to check reinforcement of retaining wall Foundation between axis AV to till end (Inner side) a
Inspection to check concreting C(32-40)very severe for retaining wall Foundation between axis AV to till
Inspection to check reinforcement of retaining wall Foundation between axis AV to till end (outer side)
Inspection to check concreting C(32-40)very severe for retaining wall kicker between axis (AT) to (AR) In
Inspection to check reinforcement of retaining wall kicker between axis (AT) to (AR) Inner side as highli
Inspection to Check Level,Alignment & Formwork of Retaining wall kicker from axis AT to AR (inner side)
Installation of Rock and Boulder RB-138 (4 layers).
Inspection to check Protection layer of geotextile sheet and protection screed below Central bridge strip
Inspection to check two layer waterproofing membrane below Central bridge strip footing.
Inspection to check solvent base primer coating below Central bridge strip footing.
Inspection to check surface preparation prior to water proofing below Central bridge strip footing.
Inspection to check Protection layer of geotextile sheet and protection screed below Promenade bridge s
Inspection to check two layer waterproofing membrane below Promenade bridge strip footing.
Inspection to check solvent base primer coating below Promenade bridge strip footing.
Inspection to check surface preparation prior to water proofing below Promenade bridge strip footing.
Inspection to Check formation level for central bridge foundation as highlighted.
Inspection to Check Level,Alignment & Formwork of Retaining wall foundation from axis AV till end as h
Installation of Rock and Boulder No. RB-249 (1st Layer)
Installation of Rock and Boulder No. RB-084 (1st Layer)
Installation of Rock and Boulder No. RB-248 (1st Layer)
Installation of Rock and Boulder No. RB-110 (1st Layer)
"Surface Preperation prior to start rip rap geotextile and filter for the bottom and slope area at Nort
"Inspection for the Installation of Geotextile and Gravel at Open Channel (From Step-1 to Step-2) as Hig
Reinforcement Steel Bars for Footing and kicker of Boundary wall Span 66 & 66A
Co-ordinates & Top level for Wall of Boundary wall @ Span 49A, 49B & 50A
Co-ordinates & Top level for Footing and kicker of Boundary wall Span 66 & 66A
Concrete Pouring for Blinding 2 nos. of Span 61B & 62B at Boundary Wall.
Installation of Steel Railing Mock-up only for Architectural Design and Pattern (Color with 4 options).
Notification to start excavation for Storm in Crescent.
Soil preparation under Boulder 062.
Soil preparation under Boulder 061.
Soil preparation under Boulder 060.
Inspection for excavation at Prayer Area zone-I as highlighted.
Inspection for excavation at Prayer Area - zone J as highlighted.
Surface preparation for Footing of Prayer Area at zone I & zone J prior to backfilling Sub-base 150mm
Concrete Pouring for Slab on Grade at Grid 6-10/I-Q as highlighted in attached drawing at Manageme
Concrete Pouring for Kicker at Span 49A, 49B & 50A at Boundary Wall.
Probing & Grouting works at Zone-1A,(71 Points)
Inspection of coordinate prior to probing works at zone-1A,(71 Points)
Concrete Pouring for Wall at Span 49A, 49B & 50A at Boundary Wall.
Inspection of First layer Block Layout at Grid 12-18/B, 18/B-F, 13/B-E, 15/B-E, 15-18/D & 16/B-D at
Inspection for Shuttering and LLevel prior to Cast the Concrete for Foundation and Side Walls of SBC-
Reinforcement inspection for the foundation and Side Walls of SBC-03.
Installation of Rock and Boulder 264.
Mock-up sample for Culvert Wing Wall stone cladding at Wadi area.
Inspection to check backfill level first layer in South Small Mosque.
Notification to start excavation for sub-service pipe at Aviary Gaarden as ttached in reference drawin
"Installation of Rock and Boulder No. 284 (Full Boulder Installation - 3 Layers)"
Installation of Rock and Boulder No. RB-083 (1st Layer)
Installation of Rock and Boulder No. RB-079 (2nd Layer)
Co-ordinates and Top level for Blinding of Boundary Wall @ Span 61B & 62B at Boundary Wall
Co-ordinates and Top level for Footing of Boundary Wall @ Span 60 & 61A at Boundary Wall
Application of Anti Termite Prior to blinding at Security & Fire Control Building, at Highlighted in attac
Top level of Blinding at Security & Fire Control Building, at Highlighted in attached Drawing.
Top level of Blinding @ Tickect booth # 2 As per attached Drawings.
Top Level of Slab on Grade at Grid 6-10/I-Q, as Highlighted in attached Drawing.
Spatter Dash for External Elevation of Security & Fire Control Building, All External elevation execpt th
Inspection for Final coat of cementitous water proofing for Boundary wall from kicker to I.G.L plus 1
Inspection for Second coat of cementitous water proofing for Boundary wall from kicker to I.G.L plus 1
Steel Reinforcement for Slab on Grade at Grid 6-10/I-Q, as Highlighted in attached Drawing, at Manage
Concrete Pouring for Boundary Wall @ Span 56, 57 & 58 at Boundary Wall
Application of Anti-Termite prior to Cast Blind Concrete at SBC - 04
Inspection to Check Backfill level second layer in South small Mosque as highlighted.
Installation of stub-up PVC conduit for Power (CCTV System) of Column Boundary Wall at Span num
Installation of stub-up PVC conduit for CCTV System of Column Boundary Wall at Span number (bet
Installation of drainage pipe (cast iron & upvc) size: 110, 75, 50mm dia. as per high lighted in the dwg
Installation of stub-up PVC conduit for Power (CCTV System) of Column Boundary Wall at Span numb
Installation of stub-up PVC conduit for CCTV System of Column Boundary Wall at Span number (betw
"Inspection for the Laying of RipRap at Strom Drainage Channel (From Chainage SP-359.82 to ST-400 ) as
Top Level & Alingment for Grade Beam at Grid 6/I-Q, as Highlighted in attached Drawing.
Core cutting of Rain water Drains Roof openings, (2 No's 10 inch) as Highlighted in attached Drawing, at
Concrete Pouring for Footing of Boundary wall @ span 59 60A & 60B
Concrete pouring for Grade Beam at Grid 6/I-Q, as Highlighted in attached Drawing, at Management Bui
Steel Reinforcement for Grade Beam at Grid 6/I-Q, as Highlighted in attached Drawing, at Management
Form work for Grade Beam at Grid 6/I-Q, as Highlighted in attached Drawing, at Management Building
Inspection to check concreting C(32-40)very severe for retaining wall between axis (AT) to (AR) Outer as
Inspection to check reinforcement of retaining wall between axis (AT) to (AR) Outer as highlighted.
Inspection to Check Level,Alignment & Formwork of Retaining wall between axis AT to AR (Outer) as hig
Inspection to Check level and location for excavation of Tunnel-2.
Soil Preperation under Boulder No. 262.
Installation of Rock and Boulder No. 247 (1st Layer).
Installation of Rock and Boulder No. RB-138 (4 Layers).
n of Stone Cladding for Boundary Wall inner face (except columns) @ wall spans 87, 88 & 89.
Installation of Rock and Boulder No. 327.
Inspection for shuttering and level prior to cast concrete for foundation and side walls of SBC-03
Inspection for First coat of cementitous water proofing for Boundary wall from kicker to I.G.L plus 15
Inspection of Anti termite prior to concrete casting under Pile Caps PC (1,2,3,4,6 & 8).
Installation of Rock and Boulder No. RB-113 (1st Layer)
Soil Preperation under Boulder No. 237
Soil Preperation under Boulder No. 072
Soil Preperation under Boulder No. 073
Surface Preperation prior of start grading to match -0.20cm from the Final Approved Level at Play Are
Surface Preperation prior of start grading to match -0.20cm from the Final Approved Level at Picnic A
Installation of GEWI Bars and grouting works for 4 mini piles at zone-2F (924,925,926 & 927)
Drilling works for 4 mini piles at zone-2F (924,925,926 & 927)
Inspection of coordinate prior to drilling works for 4 mini piles at zone-2F (924,925,926 & 927)
Installation of PVC conduit for Low Current (Voice & Data) at the Maintenance Building Laboratory R
Installation of UPVC conduit Duct Bank for Low Current (Dia.-110mm Fire Alarm,Voice Alarm,Security
Installation of PVC conduit for Power (WS) at the Maintenance Building Laboratory Room Ground floor
Installation of UPVC conduit Duct Bank for Low Voltage (Dia.-160mm 10pcs.-Sub-main cables ) at the
Steel Reinforcement for Boundary Wall @ Span 56, 57 & 58 at Boundary Wall
Steel Reinforcement for Kicker @ Span 49A, 49B & 50A at Boundary Wall
Steel Reinforcement for Footing of Boundary Wall @ Span 59, 60A & 60B at Boundary Wall
Inspection of First layer block layout at Grid 12-18/B, 18/B-F, 13/B-E, 15/B-E, 15-18/D & 16/B-D @ Ma
Inspection of Six layer block work at Grid 3-6/B, 3/A-E, 3-6/E, 4/A-E, & 5/A-E @ Management Building,
Soil preparation for Stock Boulder at Boat Garden as per highlighted in attached drawing.
Co-ordinates and Top level for Kicker @ Span 49A, 49B & 50A at Boundary Wall.
Co-ordinates and Top level for Boundary Wall @ Span 56, 57 & 58 at Boundary Wall
Installation of Rock BOulder No. 264
Installation of Rock and Boulder No. 251
Notification to start New reinstallation of existing Boulders Done By the old contractor for Boulder 09
Inspection to check blinding Concrete SRC,C(16-20) for Deviding wall at Axis T
Inspection to Check Backfill level first layer in South small Mosque
Inspection to Check Level,Location & Formwork prior to casting blinding concrete for Deviding wall @Axi
Inspection to Check Level,Location & Formwork prior to casting blinding concrete for promenade bridge
Installation of Rock and Rock Boulder 281 (full Bouolder installation 4 layers.
"Installation of Rock and Boulder No. 254 (Full Boulder Installation - 4 Layers)"
Installation of Rock and Boulder No. RB-079 (1st Layer)
Installation of Rock and Boulder No. RB-080 (1st Layer)
Notification to Start Excavation for Sub-Service Pipe at Aviary Garden, attached Reference Drawing.
Protection Layer of Geotextile on Blinding, Span @ 63, 66A, 66B, 67B, 67C, 68A & 68 B
Installation of pipes sleeve inside grade beam size: 160mm for rain water.(6pcs.)
Installation of pipes sleeve size: 250 & 160mm for water and gray water
Installation of PVC stub-up conduit (Dia.75mm Low Current -1pc. & Fire and Fire Alarm and Security -1
Installation of PVC conduit for Security System at the ground floor level Ticket Booth # 3 as per high
Installation of PVC conduit for Fire Alarm System at the ground floor level Ticket Booth # 3 as per hi
Installation of PVC conduit for Voice and Data System at the ground floor level Ticket Booth # 3 as p
Installation of PVC stub-up conduit (Dia.110mm Power -1pc. and Emergency Cables -1 pc.) at the gro
Inspection to check single layer of 4 mm thick modified bituminious water proofing membrane for stri
Inspection to check single layer of 4 mm thick modified bituminious water proofing membrane for stri
Installation of PVC conduit for power at the ground floor level Ticket Booth # 3 as per highlighted at
Installation of stub-up PVC conduit (Dia.-110mm-1 pc.) for Incoming Low Voltage Supply at Ticket Boo
Inspection to check concreting C(32-40)very severe for retaining wall kicker between axis (AT) to (AR) as
Inspection to check reinforcement of retaining wall kicker between axis (AT) to (AR) as highlighted.
Inspection to Check Level,Alignment & Formwork of Retaining wall kicker between axis AT to AR as high
Inspection to check Anti Termite prior to casting Blinding Concrete for Shear Key of Retaining Wall
Inspection to check blinding concrete SRC, C (16-20) under Retaining Wall Footing between axis (AV)
Installation of GEWI Bars and grouting for 8 mini piles at zone-2F (300,301,302,303,304,305,306 & 30
Drilling works for 8 mini piles at zone-2F (300,301,302,303,304,305,306 & 307)
Installation of GEWI Bars and grouting works for 6 mini piles at zone-1B (435,436,437,438,439 & 440)
Drilling works for 6 mini piles at zone-1B (435,436,437,438,439 & 440)
Installation of GEWI Bars and grouting works for 5 mini piles at zone-1A (185,186,187,188 & 80)
Drilling works for 5 mini piles at zone-1A (185,186,187,188 & 80)
Installation of GEWI Bars and grouting works for 6 mini piles at zone-2J (266,267,268,269,270 & 271)
Drilling works for 6 mini piles at zone-2J (266,267,268,269,270 &271)
Inspection of coordinate prior to drilling works for 8 mini piles at zone-2F(300,301,302,303,304,305,
Installation of Weatherproof Box (2pcs.) and PVC conduit (straight 20mm 1pc.) for CCTV System in
Installation of Weatherproof Box (2Pcs.) and PVC conduit (straight-20mm 1pc.) for Power (CCTV Sy
Surface Preperation prior to start rip rap geotextile and filter for the bottom and slope area at Nort
Concrete Pouring for S.O.G. at Toilet 3 as per attached drawing.
Installation of Rock and Boulder No. RB-167 (6 Layers)
Surface Preperation prior to Start Cutting-Filling under Beam & Footing of Play Area
Concrete Pouring for Kicker of Boundary wall @ span 56, 57 & 58.
Inspection of Primer coat Damp Proofing for Blinding, Spans @ 63, 66A, 66B, 67B, 67C, 68A & 68B at B
Inspection of Second coat Damp Proofing for Boundary Wall Blinding, Spans @ 63, 66A, 66B, 67B, 67C,
Inspection of First coat Damp Proofing prior to apply second coat for Boundary Wall Blinding, Spans @
Inspection of coordinate prior todrilling works for 6 mini piles at zone-2J (266,267,268,269,270 & 271
Inspection of coordinate prior to drilling works for 6 mini piles at zone-1B(435,436,437,438,439 & 44
Inspection of coordinate prior to drilling works for 5 mini piles at zone-1B(185,186,187,188 & 80)
Installation of stub-up PVC conduit for CCTV System of Column Boundary Wall at Span number (betw
Installation of stub-up PVC conduit for Power (CCTV System) of Column Boundary Wall at Span numb
Inspection to check Anti termite prior to casting blinding Concrete SRC,C(16-20) for Central bridge foun
Concrete Pouring of Blinding for SOG and Grade Beam at Grid 6-10/H-Q, as Highlighted in attached
Inspection to check Anti termite prior to casting blinding Concrete SRC,C(16-20) for Promenade bridge
Inspection to check blinding Concrete SRC,C(16-20) for Central bridge foundation.
Inspection to check blinding Concrete SRC,C(16-20) for Promenade bridge foundation.
Inspection to Check formation Level at Central bridge & Promenade bridge between Axis M & Q
Installation of Rock and Boulder No. RB-166 (6 Layers)
Installation of Rock and Boulder No. 247 (1st Layer)
Installation of Rock and Boulder No. RB-139 (5 Layers)
Installation of Rock and Boulder No. 111 (1st 2nd Layers)
"Inspection for the Laying of RipRap at Strom Drainage Channel (From SBC-03 to Step 1) as Highlighted "
Installation of Rock and Boulder No. RB-293 (1st Layer)
Inspection of Mock-up for Riyadh Stone Cladding @ Boundary wall External face @ Maze Garden, As pe
Top level and alignment for grade beam at grid 1-2/I-R as highlighted in attached drawing.
Top Level for Slab on Grade at Grid 6-10/Q-X, as Highlighted in attached Drawing.
Top level and shutter alignment for grade beam at grid 18/D-F, 18-20/F, 20/F-Q & 19-20/Q as highlig
Soil preparation for Stack boulder at Boat Garden, As per Highlighted in attached Drawing.
REINFORCEMENT INSPECTION FOR TE FOUNDATION AND SIDE WALLS OF sbc-03.
Steel Reinforcement for S.O.G. at Grid 6-10/Q-X, as Highlighted in attached Drawing, at Management Bu
Concrete Pouring of S.O.G. at Grid 6-10/Q-X, as Highlighted in attached Drawing, at Management Buildi
Concrete Pouring for blinding 7 no's of Spans @ 63, 66A, 66B, 67B, 67C, 68A, & 68B at Boundary Wall
Installation of PVC conduit sleeves for CCTV System top level of Column Boundary Wall at Span num
Installation of PVC conduit sleeves top level of Column Boundary Wall at Span number(28,29 betwee
Installation of stub-up PVC conduit for Lighting (Power-Dia.50mm 2pcs& Grounding - Dia.32mm 1pc.
Gravity Test existing underground CI drainage pipes
Inspection to check mass Concrete SRC,C(16-20) under pile cap PC(5 & 7) First layer.
Inspection to check Anti termite prior to casting mass under pile cap PC(5 & 7) First layer.
Inspection to check mass Concrete SRC,C(16-20) under pile cap PC(146) Second layer.
Inspection to Check Level,Location & Formwork prior to mass concrete under pile cap PC(5 & 7) 1st layer
Inspection to check formation level prior to casting mass concrete at PC(146) Second layer.
Inspection of Metal Plaster Grove for external elevation at Security & Fire Control Building as per at
Top level for Blinding concrete at Grid 6-10/H-Q, as Highlighted in attached Drawing.
Top level of Column for Boundary wall T.O.W to T.O.C @ C19, C20, C21, C27A, C28, C29 & C30 As per a
Co-ordinates and level of Blinding for Boundary wall @ span 63 As per attached Drawings & Coordinates
Co-ordinates and Top level of Kicker for Boundary wall @ span 56, 57 & 58 As per attached Drawings &
Steel Reinforcement for Kicker of Boundary wall @ span 56, 57 & 58.
Concrete Pouring of Blinding prior to S.O.G @ Ticket Booth # 1
Application of Anti Termite Prior to blinding at Grid 6-10/H-Q, as Highlighted in attached Drawing, at
Concrete Pouring for Column T.OW to T.O.C @ C39 & C39A at Boundary Wall
Steel Reinforcement for Column T.O.W to T.O.C @ C19, C20, C21, C27A, C28, C29 & C30 at Boundary
Notification to start Installation of Stone Boulders at Boat Garden, As per the Highlighted area in at
Co-ordinates and Top level of Blinding for Boundary wall @ span 67B, 67C, 68A & 68B As per attach
Inspection of Anti Termite prior to casting blinding concrete for Shear Key PC (165,167,169,171,173,
Inspection of Anti Termite prior to concrete casting under pile caps PC (180,178 & 176).
Inspection of Anti Termite prior to concrete casting under pile caps PC (174,172 & 170).
Inspection of Anti Termite at PC (143,141,139,137,135,133,131 & 129).
Inspection of Anti Termite prior to concrete casting fro North Watch Retaining Wall to axis AS.
Inspection of Anti Termite prior to concrete casting under pile cps PC (153,161,165,166,168 & 177).
Inspection to check Anti Termite prior to casting blinding concrete under Tunnel (5) foundation.
Surface preparation for boulder no.142 (first lift)
Inspection to check protection board for retaining wall as highlighted.
Inspection to check protection layer of Geotextile sheet and protection screed for retaining wall as high
Inspection to check primer,first & second layer of water proofing for retaining wall as highlighted.
Inspection to check surface praparation prior to water proofing for retaining wall as highlighted.
Inspection of 2nd Coat Damp proofing for Kicker top Boundary wall (Outer face) @ Span 33 & 34, As pe
Inspection of 1st Coat Damp proofing Prior to apply 2nd Coat for Kicker top Boundary wall (Outer face
Inspection of Primer coat Damp proofing Prior to apply 1st Coat for Kicker top Boundary wall (Outer f
Surface preparation Prior to Apply Primer Coat of Damp proofing for Kicker top Boundary wall (Outer f
Steel Reinforcement for Grade Beam at Grid X/7-9, 9/X-W & W/9-12 as Highlighted in attached Drawing.
Formwork for Grade Beam at Grid X/7-9, 9/X-W & W/9-12 as Highlighted in attached Drawing.
Concrete Pouring for Grade Beam at Grid X/7-9, 9/X-W & W/9-12 as Highlighted in attached Drawing.
Top level for Grade Beam at Grid X/7-9, 9/X-W & W/9-12 as Highlighted in attached Drawing.
Co-ordinates and Top level of Blinding for Boundary wall @ span 66 As per attached Drawings & Coordi
Installation of stub-up PVC conduit for Power (CCTV System) of Column Boundary Wall at Span in b
Installation of stub-up PVC conduit for CCTV System of Column Boundary Wall at Span in between (
Inspection to check protection layer of Geotextile sheet and protection screed for strip footing between A
Inspection to check protection layer of Geotextile sheet and protection screed for strip footing between
Inspection of 1st Coat Damp proofing Prior to apply 2nd Coat for Kicker top Boundary wall (Inner face)
Inspection of 2nd Coat Damp proofing for Kicker top Boundary wall (Inner face) @ Span 70, 71, 72 & 73
Inspection of Primer coat Damp proofing Prior to apply 1st Coat for Kicker top Boundary wall (Inner fa
Surface preparation Prior to Apply Primer Coat of Damp proofing for Kicker top Boundary wall (Inner f
Surface preparation for footing inside @ Ticket Booth 6 prior to apply primer, As per attached Drawings.
Steel Reinforcement for Foundation of Boundary wall @ span 49A, 49B & 50A
Concrete Pouring for Foundation of Boundary wall @ span 49A, 49B & 50A
Damp proofing 4mm Board for Footing Inside Tickect booth 5, As highlighted in attached Drawings.
Co-ordinates and Top level of Foundation for Boundary wall @ span 49A, 49B & 50A As per attached Dr
Surface preparation for external elevation of ticket booth # 3, as per attached drawing
Damp proofing 4mm Board for Footing Inside Tickect booth 4, As highlighted in attached Drawings.
Soil Preparation Under Boulder No. 294
Soil Preparation under BOulder No. 143
Inspection for th excavation of storm box culvert - SBC - 04 (as highlighted)
Soil Preperation under Boulder No. 294
Protection layer of Geotextile on Blinding Prior to footing concrete @ span 56, 57, 58, 59, 60 & 61A at
2nd Layer of Bitumin Damp proofing for Footings 5 no's @ Grids (B/4, 5, 6, 7 & 8) for Tickect booth can
Protection layer of Bituminous protection Board on Blinding Prior to footing concrete @ span 49A, 49B
Installation of Weatherproof Box for CCTV (Security System) at Site Tower-1 Ground Level Area (1 pc.
Inspection to check concreting C(32-40)very severe for pile cap foundation for PC(79,80,81 & 82)
Inspection to check reinforcement of pile cap foundation for PC(79,80,81 & 82)
Inspection to Check Level,Location & Formwork prior to casting reinforced concrete for Pile cap founda
Inspection to Check Level,Location & Formwork prior to mass concrete for Pile cap 146 (As-Built)
Installation of PVC conduit an for power and lighting switch at the ground floor level Ticket Booth #
Installation of stub-up PVC conduit (Dia.-100mm-1 pc.) for Incoming Low Voltage Supply at Ticket Boo
Concrete Pouring for Footing of Boundary wall @ span 56, 57 & 58.
Concrete Pouring for footing & Pedestal 3 no's Grid A/ 2, 3 & 4 @ Ticket Booth Canopy
Steel Reinforcement for footings 5 no's Grid B/ 4, 5, 6, 7 & 8 @ Ticket Booth Canopy
Installation of PVC conduit an for power and lighting switch at the ground floor level Ticket Booth #
Installation of stub-up PVC conduit (Dia.-100mm-1 pc.) for Incoming Low Voltage Supply at Ticket Boo
Installation of PVC conduit for Security System at the ground floor level Ticket Booth # 2 as per high
Installation of PVC conduit for Fire Alarm System at the ground floor level Ticket Booth # 2 as per hi
Installation of PVC conduit for Data System at the ground floor level Ticket Booth # 2 as per highligh
Inspection of Level & Co-ordinates of Footing's 3 no's Grid A/ 2, 3 & 4 @ Ticket Booth Canopy, As highl
Surface Preperation for SBC-04 prior to Blinding Concrete
Soil Preperation under Boulder No. 262
Soil Preperation under Boulder No. 261
Surface Preperation for Footing of Prayer Area prior to Backfilling Sub-Base 150mm
Surface preparation for footing inside @ Ticket Booth 5 prior to apply primer, As per attached Drawings.
Co-ordinates and level of Blinding for Boundary wall @ Span 56, 57, & 58, As per attached Drawings &
Steel Reinforcement for footings & Pedestals 3 no's Grid A/ 2, 3 & 4 @ Ticket Booth Canopy
Steel Reinforcement for Footing of Boundary wall @ span 56, 57 & 58.
Mock-up Sample for Culvert Wing Wall Stone Cladding at Wadi Area
Installation of Rock and Boulder No. RB-082 (Full Boulder Installation - 4 Layers)
Soil Preperation under Boulder No. 250
Soil Preperation under Boulder No. 249
Soil Preperation under Boulder No. 248
Excavation for Footing of Prayer Area in Zone 1 (As Highlighted)
Bed Preperation prior to Backfilling Sub-Base at Zone 1 (As Highlighted)
Mock up for Box fiber Optic Media converter (CCTV System) Color matching with the Boundary wall St
Notification to start Excavation at Lake Mist Garden, As per Site Condition
Surface preparation Boundary wall Prior to install Riyadh Stone cladding for Inner face @ Span 70, 71,
Inspection to check formation level prior to backfilling in south small mosque.
Installation of Stone Cladding for Boundary Wall inner face (except columns) @ wall spans 87, 88 & 89.
Inspection of 2nd Coat Damp proofing for Boundary wall @ span 39 & 40, (Inner Face) As Highlighted in
Inspection of First Coat Damp proofing Prior to apply 2nd Coat @ span 39 & 40 (Inner Face) at Boundary
Inspection of Primer coat Damp proofing Prior to apply First Coat @ span 39 & 40 (Inner Face) at Bound
Surface preparation Prior to Apply Primer Coat of Damp proofing at Boundary wall (Inner face) @ Span
Concrete Pouring for wall @ span 41 at Boundary wall
Inspection to check level, alignment & formwork of retaining wall kicker between axis (AT) and axis (
Inspection of Single Layer of Water Proofing Membrane Prior to start protection for Blinding @ span
Inspection of Primer coat Prior to apply Single Layer of Water Proofing Membrane for Blinding @ spa
Concrete Pouring for coloum from top of wall to top of coloum C22,C23,C24,C24A,C25,C26,C27,C27A as
Inspection of Application of primer for footing inside Ticket Booth 6, As per attached Drawings.
1st Coat of Damp proofing for footing inside @ Ticket Booth 6, prior to apply Second Coat, As per attac
2nd Coat of Damp proofing for footing inside @ Ticket Booth 6, As per attached Drawings.
Top Level of Concrete for coloum from top of wall to top of coloum C22,C23,C24,C24A,C25,C26,C27,C27
Spatter Dash for Elevation of Staircase & Entrance @ SITE TOWER # 1, At the highlighted in the attache
Inspection of 2nd Coat Damp proofing for Boundary wall @ span 39 & 40, (Outer Face) As Highlighted i
Notification to start excavation at Boat Garden as per site condition
Installation of Rock and Boulder 106.
Surface Preperation under Boulder No. 167 - 4th Lift
Surface Preperation under Boulder No. 167 - 3rd Lift
Surface Preperation under Boulder No. 167 - 2nd Lift
Notification to start excavation at Gynere Garden as per site condition
Soil Preparation under Boulder No. 243
Soil Preperation under Boulder No. 246
Inspection to check blinding Concrete SRC,C(16-20) under retaining wall footing between Axis (AV) to
Inspection to check Anti Termite prior to casting blinding concrete for shear key of retaining wall bet
Inspection to Check Level,Location & Formwork prior to casting blinding concrete under retaining wall
Installation of PVC conduit sleeves for CCTV System top level of Column Boundary Wall at between
Installation of PVC conduit sleeves top level of Column Boundary Wall at between Span no. 23 and 2
Inspection to check protection layer of Geotextile sheet and protection screed for strip footing between A
Inspection of Level & Co-ordinates of Footing's @ Grids ( A/1 & B/1, 2 & 3) for Tickect booth canopy, As
Steel Reinforcement for footings 4 no's Grid A/1 & B/1, 2 & 3 @ Ticket Booth Canopy
Concrete Pouring for footings 4 no's Grid A/1 & B/1, 2 & 3 @ Ticket Booth Canopy
Inspection of First Coat Damp proofing Prior to apply 2nd Coat @ span 39 & 40 (Outer Face) at Boundar
Inspection of Primer coat Damp proofing Prior to apply First Coat @ span 39 & 40 (Outer Face) at Boun
Surface Preparation of Concrete Boundary wall Prior to Install Riyadh Stone Cladding @ span 39 & 40.
Soil Preperation under Boulder No. 247
Notification to start Cut and remove the Loose material to reach the grading level at Zone 4A as Highlig
"Inspection for the Laying of RipRap at Strom Drainage Channel (Between SBC-02 to SBC-03) as Highligh
"Inspection for the Installation of Geotextile and Gravel at Open Channel (From SBC-03 to Storm Draina
Top Level for Slab on Grade at Grid 15-18/D-E, 13-18/E-Q, 18-20/F-Q & 12-20/Q-X, as Highlighted in at
Concrete Pouring for Slab on Grade at Grid 15-18/D-E, 13-18/E-Q, 18-20/F-Q & 12-20/Q-X, as Highlighte
Steel Reinforcement for Slab on Grade at Grid 15-18/D-E, 13-18/E-Q, 18-20/F-Q & 12-20/Q-X, as Highlig
Installation of Weatherproof Box and PVC conduit (stub-up 32mm 2pcs.& straight 20mm 2pcs.) for
Installation of Weatherproof Box and PVC conduit (stub-up 32mm 1pc. & straight-20mm 1pc.) for
Inspection of 2nd Coat of Damp Proofing for Blinding @ span 56, 57, 58, 59, 60 & 61A at Boundary Wall
Inspection of 1st Coat Prior to apply 2nd Coat of Damp Proofing for Blinding @ span 56, 57, 58, 59, 60
Inspection of Primer coat Prior to apply 1st Coat of Damp Proofing for Blinding @ span 56, 57, 58, 59,
Inspection of Single layer membrane at Retaining Wall @ Span 5 to 10 of Boundary Wall, As Highlighted
Damp proofing 4mm Board for the Canopy Footings 5 no's @ Grids (B/4, 5, 6, 7 & 8) for Tickect booth c
Damp proofing 4mm Board for Blindings 7 no's @ Grids (A/1, 2, 3 & 4) (B/1, 2 & 3) for Tickect booth ca
Concrete Pouring for Dome @ Tickect booth # 7 As per attached Drawings.
Inspection to check protection layer of 4 mm thick bituminious protection board for strip footing betwee
Inspection to check single layer of 4 mm thick modified bituminious water proofing membrane for strip
Inspection to check application of solvent base primer coating for strip footing between Axis ( G to F )
Inspection to check Surface preparation prior to water proofing for strip footing between Axis ( G to F )
Inspection to check protection layer of 4 mm thick bituminious protection board for strip footing between
Inspection to check single layer of 4 mm thick modified bituminious water proofing membrane for strip f
Inspection to check application of solvent base primer coating for strip footing between Axis ( F to E )
Inspection to check Surface preparation prior to water proofing for strip footing between Axis ( F to E )
Inspection to check protection layer of 4 mm thick bituminious protection board for strip footing betwee
Inspection to check single layer of 4 mm thick modified bituminious water proofing membrane for strip
Inspection to check application of solvent base primer coating for strip footing between Axis ( E to D )
Inspection to check Surface preparation prior to water proofing for strip footing between Axis ( E to D )
Soil Preperation under Boulder No. 111.
Soil Preperation under Boulder No. 110
Installation of WADI Wall for RB-140.
Installation of Weatherproof Box and conduit for CCTV (Security System) at Site Tower-1 Ground (1pc
Installation of PVC conduit for Security System at the ground floor level Ticket Booth # 1 as per high
Notification to Start Cutting to remove the Loose material under boulder No. RB-108
Notification to Start Cutting to remove the Loose material under boulder No. RB-109
Inspection of Second coat of Damp proofing at Boundary wall (Outer face) @ Span 35 & 36, As per atta
Inspection of Fisrt coat Damp proofing Prior to Apply Second Coat of Damp proofing at Boundary wall
Surface preparation Prior to Apply Primer Coat of Damp proofing at Boundary wall (Outer face) @ Span
Surface Preparation prior to start Backfilling around the Canopy Footings 5 no's @ Grids (B/4, 5, 6, 7 &
Inspection to check protection layer of 4 mm thick bituminious protection board for pile caps PC(99 & 1
Inspection to check single layer of 4 mm thick modified bituminious water proofing membrane for pile
Inspection to check application of solvent base primer coating for pile cap PC(99 & 101)
Inspection to check Surface preparation prior to water proofing for PC (99 & 101).
Installation of Stone Cladding of Boundary Wall Inner Face (except column) Span 83 & 84.
2nd Coat of Damp proofing for footing inside Ticket Booth 5, As per attached Drawings.
1st Coat of Damp proofing for footing inside Ticket Booth 4 prior to Second Layer, As per attached Draw
Inspection for Casting the Blinding Concrete at Storm Box Culvert 1, 2 & 3.
2nd Coat of Damp proofing for footing inside Ticket Booth 4, As per attached Drawings.
Inspection of Application of primer for footing inside Ticket Booth 5, As per attached Drawings.
Installation of Stone cladding for Boundary Wall Inner Face (except column) Span 76 & 77.
1st Coat of Damp proofing for footing inside Ticket Booth 5 prior to Second Layer, As per attached Draw
Application of Primer For Footings 4 No's Grids A/5, 6, 7 & 8 For Canopy @ Ticket Booth.
1st Layer of Bitumen Damp Proofing For Footings 4 No's Grids A/5, 6, 7 & 8 For Canopy @ Ticket Booth.
2nd Layer of Bitumen Damp Proofing For Footings 4 No's Grids A/5, 6, 7 & 8 For Canopy @ Ticket Booth.
Inspection for Excavation and Removing of Existing Material at Plaza area to match grading level for t
Concrete Pouring for Slab on Grade at Grid 1-2/I-R as Highlighted in attached Drawing.
Form Work for Grade Beam at Grid 18/D-F, 18-20/F, 20/F-Q & 19-20/Q as Highlighted in attached Draw
Steel Reinforcement for Grade Beam at Grid 18/D-F, 18-20/F, 20/F-Q & 19-20/Q as Highlighted in attac
Concrete Pouring for Grade Beam at Grid 18/D-F, 18-20/F, 20/F-Q & 19-20/Q as Highlighted in attached
Steel Reinforcement for Slab on Grade at Grid 1-2/I-R as Highlighted in attached Drawing.
Inspection of Metal plaster Grove for External Elevation @ SITE TOWER # 1, At the highlighted in the a
Installation of PVC conduit sleeves for Power (CCTV System) top level of Column Boundary Wall at
Installation of PVC conduit sleeves for CCTV System top level of Column Boundary Wall at Span nu
Inspection to check 50mm thick protection screed under pile caps (79,80,81 & 82)
Inspection of rock investigation under foundation of south small Mosque prior to start backfilling.
Inspection of Steel Reinforcement for Dome @ Tickect booth # 7 As per attached Drawings.
Top level and cordinates for wall at span 21 as per attached drawing for Boundary Wall.
Inspection of level of Dome @ Tickect booth # 7 As per attached Drawings.
Alignment, co-ordinates and top level for wall at span 41 as per attached drawing for Boundary Wall.
top level and cordinates for wall at span 29,30 as per attached drawing for Boundary Wall.
Inspection of Second coat of Damp proofing on Boundary wall (Inner Face) @ Span 37 & 38, As per atta
Inspection of First coat of Damp proofing prior to apply second coat on Boundary wall (Inner Face) @
Installation of Rock and Boulder No. 327
Installation of Rock and Boulder No. 281
Installation of Rock and Boulder No. 282
Installation of Rock and Boulder No. 285
Installation of Rock and Boulder No. 138
Installation of PVC conduit for Fire Alarm System at the ground floor level Ticket Booth # 1 as per hi
Installation of PVC conduit for Data System at the ground floor level Ticket Booth # 1 as per highligh
Steel reinforcment for coloum from top of wall to top of coloum C22,C23,C24,C24A,C25,C26,C27,C27A a
Installation of PVC conduit an for power and lighting switch at the ground floor level Ticket Booth #
Concrete pouring for wall at span 29 & 30 as per attached drawing
Concrete pouring for wall at span 21 as per attached drawing
Steel reinforcment for wall at span 21 as per attached drawing of Boundary wall
Inspection of Primer Coat Prior to apply 1st coat of Damp proofing at Boundary wall (Inner Face & Out
Surface preparation Prior to Apply Primer Coat of Damp proofing at Boundary wall (Outer face) @ Span
Surface preparation Prior to Apply Primer Coat of Damp proofing at Boundary wall (Inner face) @ Span
Concrete Pouring for blinding at Grid 7 to 10 / Q to X as Highlighted in attached Drawing, at Managemen
Concrete Pouring for blinding at Grid 18 to 20 / E to P as Highlighted in attached Drawing, at Manageme
Concrete Pouring for Grade Beam at Grid 13 / F to Q as Highlighted in attached Drawing, at Managemen
Inspection of Spatter Dash prior to external Plastering at Site Tower 1.
Inspection to check concreting C(32-40)very severe for retaining wall between axis (AT) to (AV) as highli
Inspection to Check Level,Location & Formwork of retaining wall between axis(AT) to axis (AV) as highli
Inspection of Steel Reinforcement for wall of Span 29 & 30 of Boundary wall
Anti Termite Treatment Prior to Blinding @ Ticket Booth # 1, As Highlighted in the Attached Drawings
Top of Blinding level @ Tickect booth # 1 As per attached Drawings.
Inspection of level & Shuttering of Columns 3 No's (C31, C32, C33) From T.O.W to T.O.C in Boundary Wal
Inspection to check Application protection layer of geotextile sheet for pile caps PC(79,80,81 & 82).
Inspection to check Application of protection layer of 4 mm thick bituminious protection board for pile
Inspection to check Application of 4 mm thick modified bituminious water proofing membrane for pile
Inspection to check concreting C(32-40)very severe for retaining wall kicker between axis (AT) to (AV) a
Inspection to check reinforcement of retaining wall kicker between axis (AT) to (AV) as highlighted.
Inspection to check 25 mm epoxy grout (Master seal 915)as per approved material for pile caps PC(79,8
Inspection to Check Level,Location & Formwork of retaining wall kicker between axis(AT) to axis (AV) as
4 Additional probing & Grouting works at zone 2K,MCPE foundation.
Concrete pouring for the Grade Beam at Grid 10 to 19 / W as Highlighted in attached Drawing, at Mana
Application of Anti Termite Prior to blinding at Grid 7 to 10 / Q to X as Highlighted in attached Drawin
Application of Anti Termite Prior to blinding at Grid 18 to 20 / E to P as Highlighted in attached Drawi
Form Work for Grade Beam at Grid 13 / F to Q as Highlighted in attached Drawing, at Management Buil
Steel Reinforcement for Grade Beam at Grid 13 / F to Q as Highlighted in attached Drawing, at Manage
Installation of Rock and Boulder 285 (First Layer).
Setting out for the first layer groove.
Mock-up inspection for the laying of Rip Rap at North Culvert and open channel.
Inspection of First layer block layout at Grid 3 to 6 / A to E @ Management Building, As per attached Dr
Top Level and Alignment for Column @ C39 & C39A at Boundary Wall
Notification to start cutting to remove the loose material under boulder no. RB-108
Installation of Rock and Boulder No. 107
Inspection for External Plaster of Elevation @ Tower 1
Installation of Stone Cladding for Boundary Wall inner face (except column) span 86.
Installation of Riyadh Stone Cladding at Boundary Wall Span 85 (Inner Face).
Steel Reinforcement for Column @ C39 & C39A at Boundary Wall
Steel Reinforcement for Wall @ span 41 at Boundary Wall
Surface preparation Boundary wall Prior to install Riyadh Stone cladding for Outer face & Inner face @
Surface preparation Prior to Start Damp proofing at Foundationof Boundary wall (Outer face) @ Span 3
Steel Reinforcement for Column No. C31 From T.O.W to T.O.C. As per Attached (KAIG3-SD-BO-S-CC-100
Inspection of Metal plaster Grove for External Elevation @ Security & Fire Control Building, As per atta
Co-ordinates and level of Blinding for Boundary wall @ Span 56, 57, 58, 59, 60 & 61A As per attached
Concrete Pouring for Column C31, C32 & C33 From T.O.W to T.O.C. As per Attached (KAIG3-SD-BO-S-CC
Installation of stub-up PVC conduit (Dia.-100mm-1 pc.) for Incoming Low Voltage Supply at Ticket Boo
Top Level for blinding under Slab and Top level for blinding under Grade Beam at Grid 18 to 20 / F to
Top Level for blinding under Slab and Top level for blinding under Grade Beam at Grid 6 to 10 / Q to X
Concrete pouring for the Grade Beam at Grid 1 to 2 / I to R as Highlighted in attached Drawing, at Man
Soil Preperation under Boulder No. 271
Soil Preperation under Boulder No. 273
Soil Preperation under Boulder No. 272
Soil Preperation under Boulder No. 079
Soil Preperation under Boulder No. 084
Soil Preperation under Boulder No. 083
Soil Preperation under Boulder No. 080
1st Layer of Bitumin Damp proofing for Footings 5 no's @ Grids (B/4, 5, 6, 7 & 8) for Tickect booth cano
Excavation Co-ordinates and Blinding top level for Boundary wall @ Span 49A, 49B & 50A As per attac
Concrete pouring for Dome @ Tickect booth # 6 As per attached Drawings.
Concrete Pouring for Blinding Prior to footing @ span 49A, 49B & 50A at Boundary Wall
Concrete Pouring for Blinding Prior to footing @ span 56, 57, 58, 59, 60, 61A & 61B at Boundary Wall
Inspection to check application of solvent base primer coating for pile cap PC(79,80,81 & 82)
Top Level of Concrete for S.O.G at Toilet 3, As per Highlighted in attached Drawings.
Inspection of level of Dome @ Tickect booth # 6 As per attached Drawings.
2nd Layer of Bitumin Damp proofing for Blindings 2 no's @ Grids (A/1 & 2) for Tickect booth canopy, As
1st Layer of Bitumin Damp proofing for Blindings 2 no's @ Grids (A/1 & 2) for Tickect booth canopy, As
Inspection of Steel Reinforcement for Dome @ Tickect booth # 6 As per attached Drawings.
Application of Primer for Footings 5 no's. @ grid (B/4, 5, 6, 7, 8) for ticket booth canopy, as highlight
Inspection to check concreting C(32-40)(62%OPC,32%FA,8%MC)very severe expose For PC(99 &102)
Inspection to check reinforcement for pile caps (99 &102)
Inspection to check casting of pile cap head grout and curing as per spec's for PC(97,98,99,100,101,102
Inspection to Check Level,Location & Formwork prior to casting reinforced concrete for pile caps (99 &
Installation of stub-up PVC conduit for CCTV System of Column Boundary Wall at Span in between (
Installation of stub-up PVC conduit for Power (CCTV System) of Column Boundary Wall at Span in b
Notification to proceed with demolishing of Northern Boundary Wall from Span 57,58,59,60,61,64,65
Inspection of Top level of Kicker innerface for Span 29 & 30 As per attached Drawings.
Concrete Pouring for Kicker innerface @ Span 29 & 30 As per Attached Drawings.
Steel Reinforcement for Column C32 & C33 From T.O.W to T.O.C. As per Attached (KAIG3-SD-BO-S-CC-
Inspection of Single Layer Membrane of water Proofing @ Span 13, 14 & 15 of Boundary Wall, As Highli
Inspection of Clane from Filler Board and Repair for Expansion Joint Prior to apply Back Rod at Retain
Inspection for Shutter Alignment & Top level of Grade Beam at Grid "10 to 19 / W" as Highlighted in
Formwork for the Grade Beam at Grid 10 to 19 / W as Highlighted in attached Drawing, at Management
Inspection for Shutter Alignment & Top level of Grade Beam at Grid "1 to 2 / I to R" as Highlighted in
Steel Reinforcement for the Grade Beam at Grid 10 to 19 / W as Highlighted in attached Drawing, at M
Steel Reinforcement for the Grade Beam at Grid 1 to 2 / I to R as Highlighted in attached Drawing, at
Formwork for the Grade Beam at Grid 1 to 2 / I to R as Highlighted in attached Drawing, at Management
Concrete Pouring for S.O.G at Toilet 3, As per attached Drawings.
Shuttering for Column & Corebel Extension Outer face for column @ Span 70, 71, 72 & 73. As per Att
Shuttering for Boundary wall - Corebel Extension Inner face @ Span 70, 71, 72 & 73. As per Attache
Concrete Pouring for Column & Corebel Extension Outer face for column @ Span 70, 71, 72 & 73. As
Concrete Pouring for Boundary wall - Corebel Extension Inner face @ Span 70, 71, 72 & 73. As per A
Installation of PVC conduit sleeves top level of Column Boundary Wall in between Span # 33 and 34
Installation of PVC conduit sleeves top level of Column Boundary Wall in between Span # 33 and 34
"Surface Preperation prior to start rip rap geotextile and filter for the bottom and slope area at Nort
Reinforcement Inspection for the Foundation and Side Walls of SBC-03
Installation of Stub-up PVC conduit (75mm dia.) for Low Current Cables (2pcs. Incoming Low Current Ca
"Notification to start Backfill at North Culvert and Open Channel (SBC-03 to SBC-04 As Highlighted)"
Installation of Stub-up PVC conduit (75mm dia.) for Low Current Cables (2pcs. Incoming Low Current Ca
Soil Preperation under Boulder No. 113
Soil Preperation under Boulder No. 111
Soil Preperation under Boulder No. 110
Notification to Start Cutting to remove the Loose material under boulder No. RB-109
Installation of Stub-up PVC conduit (110mm dia.) for Power (1pcs. Incoming Main Supply -1 pc, Incomi
Installation of Stub-up PVC conduit (110mm dia.) for Power (1pcs. Incoming Main Supply -1 pc, Incomin
Inspection to check Concreting SRC, C (16-20) under Pile Cap (146 1st layer).
Inspection to check Anti Termite prior to casting blinding concrete under Pile Cap (146 1st layer).
Inspection to check Level, Location & Formwork prior to casting blinding concrete under Pile Cap 146
Installation of drainage pipe (cast iron & upvc) size: 100, 75, 50mm dia. as per high lighted in the dw
Installation of Rock and Boulder No. 107 (First Layer)
Application of Primer for Blindings 2 no's @ Grids (A/1 & 2) for Tickect booth canopy, As highlighted in
Damp Proofing 1st layer for Blindings 5 no's @ Grids (A/3 & 4)(B/1, 2 & 3) for Tickect booth canopy, As
Damp Proofing 2st layer for Blindings 5 no's @ Grids (A/3 & 4)(B/1, 2 & 3) for Tickect booth canopy, As
Inspection to check concrete SRC(C-32/40 Very Severe)of retaining wall kicker between axis (AT) and axi
Inspection to check reinforcement of retaining wall kicker between axis (AT) and axis (AV) as highlighted
Inspection to check Level,Alignment & Formwork of retaining wall kicker between axis (AT) and axis (AV
Installation of PVC conduit (110mm dia.) for Power (1pcs. Incoming Main Supply -1 pc, Incoming Emerge
Installation of PVC conduit (110mm dia.) for Power (1pcs. Incoming Main Supply -1 pc, Incoming Emerge
Installation of PVC conduit (75mm dia.) for Low Current Cables (2pcs. Incoming Low Current Cable-1pc.
Installation of PVC conduit (75mm dia.) for Low Current Cables (2pcs. Incoming Low Current Cable-1pc.
Installation of drainage pipe (cast iron & upvc) size: 100, 75, 50mm dia. as per high lighted in the dw
Installation of drainage pipe (cast iron & upvc) size: 100, 75, 50mm dia. as per high lighted in the dw
Concrete pouring for the slab on grade at grid 12-18/A-F as highlighted in attached drawing at Mana
Inspection of S.O.G Top level @ Grid A-F/12-18, Management Building As highlighted in attached Drawin
Inspection of level & Co-ordinates of Concrete for Span 26, 27 & 28 As per attached Drawings.
Inspection of level & Co-ordinates of Concrete for Span 19 & 20 As per attached Drawings.
Installation of Rock and Boulder No. 106
Bed Preperation prior to start backfilling at Plaza Area behind the boundary wall as per the attached dr
Inspection of Rebar Planting for Column & Corebel Extension Outer face for column @ Span 70, 71, 7
Inspection of Rebar Planting for Boundary wall - Corebel Extension Inner face @ Span 70, 71, 72 &
Inspection of surface preparation for footing inside Ticket Booth 6 prior to application of primer, As pe
Inspection of surface preparation for footing inside Ticket Booth 4 prior to application of primer, As pe
Inspection Prior to Concrete pouring for Wall @ Span 19 & 20 As per attached Drawings.
Notification to start backfill to match grading level at Plaza area behind Boundary Wall.
Inspection Prior to Concrete pouring for Wall @ Span 26, 27 & 28 As per attached Drawings.
Installation of Stone Cladding of Boundary Wall Inner Face (except column) Span 83 & 84.
Inspection Prior to Concrete pouring for Dome @ Tickect booth # 5 As per attached Drawings.
Inspection of Steel Reinforcement for Dome @ Tickect booth # 5 As per attached Drawings.
Inspection Prior to Concrete pouring for Footings 4 no's @ Grids (A/5, 6, 7 & 8) for Tickect booth canop
Inspection of Steel Reinforcement for Footings 4 no's @ Grids (A/5, 6, 7 & 8) for Tickect booth canopy,
Inspection of level of Dome @ Tickect booth # 5 As per attached Drawings.
Inspection of level & Co-ordinates of Footing's @ Grids (A/5, 6, 7 & 8) for Tickect booth canopy, As hi
Inspection to check surface prepation to start water proofing of pile cap PC(77,78,79,80,81 & 82)
Installation of drainage pipe (cast iron & upvc) size: 100, 75, 50mm & 110mm dia. as per high lighted
Installation of Stone Cladding of Boundary Wall Inner Face (except column) Span 83 & 84.
Installation of drainage pipe (cast iron & upvc) size: 100, 75, 50mm dia. as per high lighted in the dwg
Installation of drainage pipe (cast iron & upvc) size: 100, 75, 50mm dia. as per high lighted in the dwg
Installation of Weatherproof Box (110x110mm-2pcs.) and PVC conduit ( stub-up-32mm & straight 20
Installation of Weatherproof Box (110x110mm-2pcs.) and PVC conduit ( stub-up-32mm & straight 20
Inspection to check concrete OPC(C-32/40 Very Severe) for PC(99 &101)
Inspection to check reinforcement for pile caps (99 & 101)
Inspection to Check Level,Location & Formwork prior to casting reinforced concrete for pile caps (99 &
Steel Reinforcement for slab on grade at Management building Grid A-F/12-18
Soil Preperation under Boulder No. 244
Soil Preperation under Boulder No. 241
Soil Preperation under Boulder No. 240
Soil Preperation under Boulder No. 109 (instead of 106)
Inspection of Single Layer Membrane of water Proofing @ Span 2, 3 & 4 of Boundary Wall, As Highlig
Steel Reinforcement for S.O.G at Toilet 3, As per attached Drawings.
Application of Primer Coat at Inner face For Retaining wall for water proofing prior to apply Membr
Installation of rain water pipes sleeve (upvc class 4) 110mm dia. & 75mm ticket booth # 7
Installation of rock and boulder no. 265
Inspection prior to pour concrete for span 31 of boundary wall
Inspection prior to pour columns concrete 3 no's (C34, C35, C36) from T.O.W. to T.O.C. in boundary w
Inspection of survey level and shuttering of columns 3 no's (C34, C35, C36) from T.O.W. to T.O.C. in
Inspection of survey level and shuttering of boundary wall for span 31
Inspection of level & coordinates of blinding concrete for foundations Grid 2-A, 1-A at ticket booth c
Installation of PVC Conduit 160 mm dia. for Power ( Sub- Main Cable -2pcs.) at the Maintenance Bui
Inspection prior to primer application for footing 5 no's grids (A/3&4) (B/1, 2 &3) for canopy at ticket
Inspection to check Concreting SRC,C(16-20) under Pile cap(146, 1st layer).
Inspection prior to application of anti termite treatment for foundation 2 no's @ grid 2-A, 1-A at tic
Inspection to check Anti Termite prior to casting blinding concrete under Pile cap(146 1st layer).
Inspection of survey level, coordinates and shuttering of boundary wall for span 39 & 40
Inspection to Check Level,Location & Formwork prior to casting blinding concrete under Pile cap 146 -1s
Inspeaction prior to pour blinding concrete for footing 2 no's Grid 2-A, 1-A @ ticketing booth canopy
Inspection prior to concreting for boundary wall span 39 & 40
Notification to start grading (Cut & Fill) to - 750mm grading level at Bus Station Area as per the att
Inspection for Casting the Blinding concrete at Storm Box Culvert 01,02 & 03
Application of Anti Termite Prior to cast Blind Concrete at Storm Box Culvert 1, 2, 3
Installation of Rock and Boulder No. 260
Surface Preperation prior to start backfiling at Bus Station as per the the Attached Marked Drawing
Surface Preperation prior to start backfiling at Plaza Area as per the the Attached Drawings
Installation of PVC Conduit & Boxes for Airconditioning Unit at Ticket Booth #7 Roof Level (DOME) A
Inspection for Top of slab level @ Ticket Booth #7
Inspection of location 250mm Sleeve oppening 2 no's in Slab @ Toilets (1-5) Prior to Core Cutting.
Inspection for Shuttering and Level Prior to Cast the Blinding Concrete at Storm Box Culvert 1, 2, 3
Concrete Pouring for blinding for SOG and Grade Beam at Management Building Grid 1-2 / I-R
Steel Reinforcement bars for Slab at ticket booth 7
Concrete pouring for Slab at ticket booth 7
Application of Anti termite prior blinding for SOG and Grade Beam at Management Building Grid 1-2 /
Inspection to check mass Concreting SRC,C(16-20) 45 cm from the wall footing foundation width(+ or -
Inspection to check concrete (C-32/40 Very Severe) of retaining wall footing between axis (AT) and axis
Soil Preperation under Boulder No. 267.
Inspection to check reinforcement of retaining wall footing between axis (AT) and axis (AR) as highlighte
Inspection to check Level,Alignment & Formwork prior to casting concrete of retaining wall footing betw
Top Level of beam and shutter for Management Building (Grid A/06-09, A-B/09, B/09-10)
Top Level of blinding under SOG for Management Building (Grid J-R / 01-09)
Inspection of Surface Preparation prior to proceed Damp Proofing (outer Face) foundation of Bounda
Inspection of Primer Coat Damp Proofing prior to proceed 1st Coat Damp Proofing (outer Face) found
Inspection of 1st Coat Damp Proofing prior to proceed 2nd Coat Damp Proofing (outer Face) foundati
Inspection of 2nd Coat Damp Proofing prior to proceed Installation of Riyadh stone (outer Face) fou
Shuttering and top Level of Concrete for wall kicker at Boundary wall span 29 30
Concrete Pouring for wall Kicker at boundary wall span 30 29
Installation of PVC conduit sleeves for CCTV System at the top level of Column Boundary Wall Span #
Installation of Rock and Boulder No. 265B
Installation of direct buried PVC conduit 110 dia. for Low Current (Incoming Fire & Security Cables -
Installation of Rock and Boulder No. 197 (First Layer)
Installation of PVC conduit sleeves for Power (CCTV System) at the top level of Column Boundary Wal
Installation of Rock and Boulder No. 104 (First Layer)
Installation of WADI Wall for RB-137
Inspection of Steel Reinforcement for Grade Beam at GL 6-10/A-B.
Inspection of Formworks for Grade Beam at GL 6-10/A-B.
Concrete Pouring of Grade Beam at GL 6-10/A-B.
Application of Primer for Waterproofing of Columns at GL 15/F, 15/I, 15/M, 15/Q, 17/Q, 14/S, 12/S, 1
Notification prior to start additional block work besides column 4 Grade Beam at GL 18/F, 1/J & 2/J.
Concrete Coring for 4 pcs Roof Drain 250 dia. & 3 pcs Vent Pipes 110 dia.
Application of protection board for footing at GL 18/F of Management Building.
Application of second coat for Waterproofing of footing at GL 18/F of Management Building.
Installation of PVC conduit & boxes for Lighting System at Ticket Booth #7 roof level as per highlight
Installation of PVC conduit & box for Fire Alarm System at Ticket Booth # 7 roof level as per highligh
Top level of Column from Span (69, 70, 71, 72 & 73) at Boundary Wall.
Surface preparation prior to proceeding waterproofing inner face of retaining wall span 13, 14 & 15.
Application of membrane single layer inner face on retainign wall at spans 5,6,7,8,9,10,11 & 12.
Installation of Rock and Boulder No. 263
Installation of Rock and Boulder No. 103.
Installation of Rock and Boulder No. 245.
Installation of Rock and Boulder No. 245.
Installation of Rock and Boulder No. 247
Installation of Rock and Boulder No. 247.
Installation of Rock and Boulder No. 243.
Installation of Rock and Boulder No. 246.
Installation of Rock and Boulder No. 266.
Inspection for Installation prior to Backfilling of Protection Board of Footing of Ticket Booth 3 (Inside)
Inspection for installation prior to backfilling of protection board of footing of Ticket Booth 2 (Inside).
Inspection for Installation prior to Backfilling of Protection Board of Footing of Ticket Booth 1 (Inside)
Inspection of Reinforcing Steel for Dome of Ticket Booth 4.
Checking of Reinforcement Steel for Boundary Wall Span 39/40.
Application of First Coat for Waterproofing of Footing at GL 18/F of Management Building.
Second layer of waterproofing membrane with expansion joint and backing rod of retaining wall span
Excavation for Storm Box Culvert SBC-01, SBC-02 & SBC-03 (as highlighted).
Soil preparation under Boulder 074.
Installation of protection board for waterproofing memebrane for expansion jooint of retaining wall
Inspection of coordinate prior to probing works at zone-D,Boundary wall foundation apan 49A to 69 (
Concrete Pouring for 5 Footings Canopy.
Probing & Grouting works at Zone-D Boundary wall foundation span 49A to 69 (27 Points) part-2
Surface preparation for Boundary Wall prior to installation of Riyadh Stone Cladding for Span 70,71,7
Inspection to check reinforcement for wall of retaining wall footing between axis (AV) and axis (AT) as h
Installation of scooper roof drain size: 75mm dia.
Inspection of Shutter at Top Wall Span 32 Top of Kicker inside Span 31 and Top of Kicker outside Spa
Concrete Pouring of Wall Span 32 Kicker inside Span 31 & Kicker outside Span 30 & 29.
Steel Reinforcement for Kicker and Wall at Span 19, 20 & 21.
Steel Reinforcement for Kicker outside and inside at Span 32 and Column C31 and Wall Steel Reinfor
Primer for Footing inside Ticket Booth 2.
Checking of Shuttering and Top Level of Kicker of Boundary Wall Span 19, 20 & 21.
Concrete Pouring for Kicker of Boundary Wall Span 19, 20 & 21.
Inspection of surface preparation prior to water proofing under strip footings in zone (2B)as highlighte
Installation protection board on Canopy footings (5 footings).
Inspection for Level of Dome Shutter for Ticket Booth 4.
Checking of Coordinates for Canopy fooundation and Top Level of the Base.
Checking of Steel Reinforcement of Boundary Wall Span 26, 27 & 28.
Application of Primer for Waterproofing of Footing at GL 18/F of Management Building.
Checking of Top Level of Concrete of Slab on Grade GL 3-6/A-E.
Concrete Pouring for Slab on Grade at GL 3-6/A-E.
Inspection of Reinforcement for Slab on at GL 3-6/A-E.
Concrete Pouring of Doom at Ticket Booth 4.
Installation of Stone Cladding for Boundary Wall Inner Face (except Column ) Span 76 & 77.
Installation of Stone Cladding for Boundary Wall Inner Face (except Column) Span 86.
Application of Primer for Footing of Ticket Booth 5.
Application of First Layer of Damp Proofing Materials at Ticket Booth 5.
Application of Second Layer of Damp Proofing Materials at Ticket Booth 5.
Installation of Protection Board 4mm Thick at Ticket Booth no. 5 Footing.
Installation of stub-up PVC conduit for Power (CCTV System) of Column Boundary Wall at Span 29&30
Inspection to check reinforcement of wall retaining wall footing between axis (AV) and axis (AT) as high
Installation of WATER pipe (copper pipe & insulation) size: 35, 28, 22mm dia. as per high lighted in t
Rectified the concrete masonry units due to MEP works as per NCR ( KAIGE-NCR-TT-A-0001-00)
Installation of stub-up PVC conduit for CCTV System of Column Boudary Wall at Span 29&30 as per hi
Notification to start excavation for Culvert and open channel in zone-2B.
Installation of Rock and Boulder 250.
First layer of water proofing membrane with expansion joint and backing rod of retaining wall span n
Probing & Grouting works at Zone-B,Boat garden jetties deck foundation (26 points) part-2
Inspection of coordinate prior to probing works at zone-B,Boat garden Jetties foundation (26 points)
Probing & Grouting works at Zone-C,New ticket booth & Canopy Foundation (74 points)
Probing & Grouting works at Zone-B,Water play garden precast collection chambers & Wet well B,E &
Inspection of coordinate prior to probing works at zone-C,New ticket booth & Canopy Foundation (74
Inspection of coordinate prior to probing works at zone-B,Water play garden precast collection chamb
Application of Primer Coat of Retaining Wall inner face 9, 10, 11 & 12.
Installation of Stone Cladding for Concrete for Boundary Wall (Inner Face except column) at Span 79
Inspection of Steel Rinforcement of Columns C34, C35 & C36 from Top of Wall up Top of Column.
Inspection of Steel Reinforcement for Wall and Kicker of Span 21 of Boundary Wall.
Inspection of Steel Reinforcement for Wall and Kicker of Span 29 & 30 of Boundary Wall.
Installation of Protection for water proofing for PC (97,98,99,100,101 & 103)
Notification to start Backfill to match grading level at Plaza area behind Boundary Wall.
Installation of PVC conduit (110mm dia.) for Power (1pcs. Incoming Main Supply -1 pc, Incoming Emerge
Installation of PVC conduit (75mm dia.) for Low Current Cables (2pcs. Incoming Low Current Cable-1pc.
Checking of Shuttering & Top Level of Wall for Span 33 and the Top Level of Kicker outside & inside o
Concrete Pouring of Wall at Span 33 and the Kicker inside Span 32 and Kicker outside span 31.
Concrete Pouring of Columns 37 & 38 from Top of Wall up to Top Level of columns.
Coring as per attached drawing at Fire Control & Security Building.
Concrete Pouring of Blinding Concrete under Grade Beam GL 6-9/A; GL 9-10/B.
Application of Anti Termite under Grade Beam GL 6-9/A; GL 9-10/B.
Installation of Riyadh Stone Cladding at Boundary Wall Span 85 (Inner Face).
Installation of Weatherproof Box for CCTV (Security System) at Site Tower-1 Ground (1pc.) & Roof (20
Drilling works for 2 mini piles at zone-1D (2014 & 2015)
Installation of GEWI Bars and grouting works for 2 mini piles at zone-1D (2014 & 2015)
Installation of GEWI Bars and grouting works for 6 mini piles at zone-1B (2002,2003,2004,2005,2006
Drilling works for 6 mini piles at zone-1B (2002,2003,2004,2005,2006 & 2007)
Installation of Shuttering of Grade Beam at GL 12-18/B & 18/B-D of Management Building.
Application of Anti Termite at GL10-18/Q; GL 10-18/W; GL 10/Q-W; GL 18/Q-S of Management Building
Concrete pouring for blinding of footing of Canopy at Old Ticket Booth (7 footings).
Application of Anti Termite for footing of Canopy at Old Ticket Booth (7 footings).
Inspection of steel reinforcement for wall and kicker of Boundary Wall (Span 31).
Checking of Reinforcing bars for Canopy Footing (5 footings).
Inspection to check concrete (C-32/40 Very Severe) of retaining wall footing between axis (AT) and axis
Concrete pouring of blinding under grade beam & slab on grade at GL 10-18/Q; GL 10-18/W; GL 10/
Inspection to check reinforcement of retaining wall footing between axis (AT) and axis (AR) as highlight
Inspection to check Level,Alignment & Formwork prior to casting concrete of retaining wall footing betw
Concreting of grade beam at GL 12-18/B & 18/B-D of Management Building.
Checking of coordinates for excavation and top level of blinding concrete of Ticket Booth Canopy foun
Inspection of surface preparation for footing inside Ticket Booth 5 prior to application of primer.
Inspection to check Concreting SRC,C(16-20) under Tunnel (5) foundation.
Inspection to check Anti Termite prior to casting blinding concrete under Tunnel (5) foundation.
Inspection to Check Level,Location & Formwork prior to casting blinding concrete under tunnel(5)Found
Inspection of rock investigation prior to casting concrete under tunnel (5) foundation.
Installation of PVC conduit (110mm dia.) for Low Current ( 4pcs.-ICT cables, 2pcs. Fire & Security Sub
Installation of PVC conduit for CCTV System at boundary wall (Column Span 37) Zone C as per highli
Inspection of Spatter Dash prior to External Plastering at Site Tower 1.
Excavation for open channel between SB-03 to SB-04 (as highlighted).
Installation of Rock and Boulder 263.
Surface preparation prior to start Rip Rap Geotextile and filter for the bottom and slope area at Nor
Inspection of Steel Reinforcement of Grade Beam at GL 12-18/B & 18/B-D of Management Building.
Checking of top level of blinding under grade beam and unde slab on fill at Management Building G
Checking of Shuttering alignment and top level of grade beam at GL 12-18/B & 18/B-D of MAnagemen
Notification to start excavation for foulwater in crescent.
Concreting of Boundary Wall Span 23, 24 & 25.
Checking of Top Level of Wall and Shuttering of Boundary Wall Span 23, 24 & 25.
Installation of GEWI Bars and grouting works for 2 mini piles at zone-1A (2000 & 2001)
Installation of GEWI Bars and grouting works for 2 mini piles at zone-1H (2016 & 2017)
Drilling works for mini piles at zone-2F (624,625,626,627,70 & 71)
Installation of GEWI Bars and grouting works for 6 mini piles at zone-1C (2008,2009,2010,2011,2012
Drilling works for 6 mini piles at zone-1C (2008,2009,2010,2011,2012 &2013)
Drilling works for 2 mini piles at zone-1H (2016 & 2017)
Installation of GEWI Bars and grouting works for 5 mini piles at zone-1K (2024,2025,2026,2027 & 20
Drilling works for 5 mini piles at zone-1K (2024,2025,2026,2027 & 2028)
Installation of GEWI Bars and grouting works for 3 mini piles at zone-1L (2030,2032 & 2034)
Drilling works for 3 mini piles at zone-1L (2030,2032 & 2034)
Installation of GEWI Bars and grouting works for 6 mini piles at zone-1J (2018,2019,2020,2021,2022
Drilling works for 6 mini piles at zone-1J (2018,2019,2020,2021,2022 & 2023)
Installation of GEWI Bars and grouting works for 4 mini piles at zone-2H (262,263,264 & 265)
Drilling works for 4 mini piles at zone-2H (262,263,264 & 265)
Installation of GEWI Bars and grouting works for 4 mini piles at zone-1C (481,482,483 & 484)
Drilling works for 4 mini piles at zone-1C (481,482,483 & 484)
Inspection of coordinate prior to drilling works for 4 mini piles at zone-2H(262,263,264 & 265)
Inspection of coordinate prior to drilling works for 4 mini piles at zone-1C(481,482,483 & 484)
Installation of Protection for water proofing at PC (102 & 104)
Installation of PVC conduit for Power (CCTV System) at boundary wall (Column Span 37) Zone C as p
Inspection of coordinate prior to probing works at zone-B,Water play Garden Precast collection cham
Installation of PVC conduit (160mm dia.) for Power (3pcs. Sub Main Cable, 1 pc Power Ticket Booth, 1 p
Checking of FFL (External) and level for the First Layer Groove.
Installation protection Board on Canopy Footings (4 Footings).
Application of 1st Layer Damproofing on Canopy Footings ((4 Footings).
Application of 2nd Layer Dampproofing on Canopy Footings (4 Footings).
Application of Primer on Canopy Footings (4 Footings).
Inspection of coordinate prior to drilling works for 6 mini piles at zone-1F(135,136,137,138,139 & 140
Inspection of coordinate prior to probing works at zone-B, Boat Garden jetties Desk Foundation (39 P
Installation of GEWI Bars and grouting works for 6 mini piles at zone-1F (135,136,137,138,139 & 140)
Drilling works for 6 mini piles at zone-1F (135,136,137,138,139 & 140)
Probing & Grouting works at Zone-B,Water play Garden precast collectin chambers & wet well B,E & F
Probing & Grouting works at Zone-B,Sound & Boat Garden Jetties Desk Foundation (39 Points) Part-1
Installation of water proofing for PC (97,98,99,100,101 & 103)
Application of primer coat for water proofing for PC (97,98,99,100,101 & 103)
Concrete Pouring for Kicker at Span 19 & 20 (Outside Level) as per attached drawing.
Soil Preparation under Boulder 197.
Installation of Rock Boulder 246.
Installation of Rock Boulder 266.
Inspection of coordinate prior to drilling works for 2 mini piles at zone-1D (2014 & 2015)
Inspection of coordinate prior to drilling works for 2 mini piles at zone-1A (2000 & 2001)
Inspection of coordinate prior to drilling works for 6 mini piles at zone-1B (2002,2003,2004,2005,20
Inspection of coordinate prior to drilling works for 6 mini piles at zone-1C (2008,2009,2010,2011.20
Inspection of coordinate prior to drilling works for 2 mini piles at zone-1H(2016 & 2017)
Installation of Stone Cladding for Concrete Boundary Wall outer face (except Column) Wall Span 76.
Surface preparation for Boundary Wall prior to install Riyadh Stone Cladding for Span 70,71,72 & 73 (
Foundation excavation and coordinate for Blinding and Top Level for Blinding.
Notification to Start Boulders 246.
Notification to Start Boulders 266,265,263,243 & 245.
Surface preparation prior to start Rip Rap Geotextile and filter for the bottom and Slope area at Nor
Mock-up inspection for the LAying of Rip Rap at North Culvert and open channel.
Concrete pouring for wall span34,Kicker inside span 33 &kicker out side span 32 as per attached Drawin
Steel Reinforcement for column C38A and C37 at top side of wall.
Shuttering and top levels of concrete for colunn C38A & C37
Top level for shuttering for kicker out side at span 19 & 20
Top level shuttering for wall span 34 kicker inside 33
Inspection of Concrete Pouring for Blinding (16-20) of Canopy Footing (5 Footings).
Inspection to check Anti Termite prior to Casting Blinding concrete under Canopy.
Inspection of Concrete Pouring for Blinding (16-20) of Canopy Footing (4 Footings).
Concrete Pouring for Column (69,70,71,72 & 73).
Concrete Pouring for the Grade Beam at Management Building.
Concrete Pouring of Slab at Ticket Booth 6.
Final Coat of Cementeteous Waterproofing for Boundary Wall Span 76 & 77.
Top of Slab Elevation for Ticket Booth 6.
Concrete Pouring for Blinding of Grade Beam & SOG at Management Building.
Installation of protection board for Retaining Wall prior to start Backfilling at Span 46,47 & 48 as high
Soil Preperation under Boulder No. 195
Soil Preperation under Boulder No. 196
We request your attendance to inspect the following works : Soil Preperation under Boulder No. 26
Installation for Riyadh Stone Cladding at Boundary Wall Span 78, 80, 81 (Inner Face).
Inspection to check concrete (C-32/40 Very Severe) of retaining wall footing between axis (AV) and axi
Inspection to check reinforcement of retaining wall footing between axis (AV) and axis (AT) & between
Inspection to check Level,Alignment & Formwork prior to casting concrete of retaining wall footing bet
Primer for Blinding of Canopy for Ticket Booth.
1st Layer Damp Proofing for Blinding of Canopy.
2nd Layer Damp Proofing for Blinding of Canopy.
Installation of PVC conduit sleeves top level Column Boundary Wall in between Span # 69&70,70&71
Installation of PVC Conduit & Boxes for Airconditioning Unit at Ticket Booth #6 Roof Level (DOME) A
Inspection to check Concreting SRC,C(16-20) under Pile cap (144-17) Third layer.
Inspection to Check Level,Location & Formwork prior to casting blinding concrete under pile cap PC (144
Inspection to check concrete (C-32/40 Very Severe) of retaining wall footing between axis (AV) and axis
Inspection to check reinforcement of retaining wall footing between axis (AV) and axis (AT) as highlight
Inspection to check Level,Alignment & Formwork prior to casting concrete of retaining wall footing betw
Application of Primer Coat on Retaining Wall for Waterproofing Span (5,6,7 & 8) Inner Face.
Application of Anti Termite for Blinding of Grade Beam and SOG at Management Building.
Primer for Footing inside Ticket Booth 3.
Application for Damp Proofing (2nd layer) for Footing at Ticketing Booth 3.
Soil preparation under Boulder 135.
Shuttering for Top Level of Kicker outside and inside at Span 32.
Application for Damp Proofing (2nd layer) for Footing at Ticketing Booth 2.
Application for Damp Proofing (1st layer) for Footing at Ticketing Booth 3.
Application for Damp Proofing (1st Layer) for Footing at Ticketing Booth 2.
Coordinate and Level at Sub-Grade under Boulder RB-243,245,246,247,261,263,264,265,265A,265B,
Coordinate and Level at Sub-Grade under Boulder RB-103.
Installation of drainage pipe (cast iron & upvc) size: 2" , 3" 4"dia. as per high lighted in the dwg.
Installation of water proofing for PC (97 & 101)
Application of primer coat for water proofing for PC (97 & 101)
Top level of Blinding for Management Building.
Drilling works for 1 mini pile at zone-1L (2029)
Probing & Grouting works at Zone-2H,Tunnel-1 (52 Points)
Installation of GEWI Bars and grouting works for 1 mini pile at zone-1K (2029)
Installation of GEWI Bars and grouting for 3 mini piles at zone-1L (2035,2033 & 2031)
Drilling works for 3 mini piles at zone-1L (2035,2033 & 2031)
Inspection of coordinate prior to probing works at zone-2H,Tunnel-1(52 Points)
Inspection of coordinate prior to probing works at zone-2H,Tunnel-1(64 Points).
3 Additional probing & grouting works at zone-2M,MCPE Foundation, as per comments in RFI-CO-GE
2 Additional probing & grouting at zone-2H, Tunnel-1 as per comments in RFI-CO-GE-0119-00
6 Additional probing & grouting works at Zone-2H Tunnel-1, As per consultants comments on KAIG
Probing & Grouting works at Zone-2H,Tunnel-1 (64 Points)
Inspection for Formwork for Grade Beam at Management Building.
Inspection for Steel Reinforcement for Grade Beam at Management Building.
Soil Preperation under Boulder No. 250
Concrete pouring for kicker inside at span 34 as per attached drawing.(C32/40 very severe)
Steel Reinforcement for Slab at Ticket Booth 6 as per attached drawing.
Concrete pouring for wall at span 35 as per attached drawing.(C32/40 severe)
Top level of wall at span 35 and top level of inside kicker at span 34 as per attached drawing.
Installation of rain water pipes CI 4", as per high lighted.
Groove installation setting out for Tower 1 external elevation (as highlighted).
Inspection to check protection layer of non woven geotextile sheet 180gm/sq.m loose laid screed protec
Inspection to check solvent base primer coating and first layer 4mm thick app modified bituminious
Inspection of Spatter Dash prior to external Plastering at Site Tower 1.
Installation of PVC conduit & boxes for Lighting System at Ticket Booth #6 roof level as per highlight
Installation of PVC conduit & box for Fire Alarm System at Ticket Booth # 6 roof level as per highligh
Inspection for 2nd Coat application of Cementeteous Waterproofing at Span (76 & 77) Inner Face at
Inspection of Spatter Dash prior to external Plastering at Site Tower 1.
Steel Reinforcement of Column (69,70,71,72 & 73) prior to close Shuttering.
Inspection of coordinate prior to drilling works for 6 mini piles at zone-1J (2018,1019,2020,2021,202
Inspection to Check alignment and top level of beam
Surface preparation prior to start primer coat of retaining wall inner face 9,10,11 & 12
Installation of rain water pipes CI 4", as per high lighted.
Installation of stub-up PVC conduit for Power (CCTV System) at boundary wall Column (#1,2,3,4,6,9,1
Installation of stub-up PVC conduit for CCTV System at boundary wall Column (#1,2,3,4,6,9,13,16) Zo
Formwork for the Post and Beam beside existing Column at Management Building.
Concrete Pouring for Post and Beam beside existing Column at Management Building.
Inspection for Steel for the Post, Beam and Column at Management Building.
Inspection to check steel reinforcement for wall at span 23,24 & 25.
Inspection to check steel reinforcement for kicker and wall at span 33,34 and steel reinforcement for wa
Inspection of rock investigation prior to casting concrete under pile cap PC(31)
Inspection to check Concreting SRC,C(16-20) under Pile cap(31).
Inspection to check Anti Termite prior to casting blinding concrete under Pile cap(31).
Inspection to Check Level,Location & Formwork prior to casting blinding concrete under pile cap(31).
Probing & Grouting works at Zone-2H,Tunnel-1 (69 Points)
Inspection of coordinate prior to probing works at zone-2H, Tunnel-1 (69 Points)
Inspection to Check excavation coordinate and level for front canopies from axis (AO) to axis (Z)
Probing & Grouting works at Zone-2H,Tunnel-1 (72 points)
Inspection of coordinate prior to drilling works for 6 mini piles at zone-1K (2029,2028,2027,2026,20
Inspection of coordinate prior to probing works at zone-2H,Tunnel-1 (72 Points)
Excavation for open channel between culvert 2-3.
Notification to start cut and fill to match grading level at Bus parking area as attached with this RFI.
Coring as per attached drawing at Fire Control & Security Building.
Inspection for Installation prior to Backfilling of Protection Board of Footing of Ticket Booth 3 (Inside)
Inspection for Installation prior to Backfilling of Protection Board of Footing of Ticket Booth 2 (Inside)
Inspection for Installation prior to Backfilling of Protection Board of Footing of Ticket Booth 1 (Inside)
Top level of Blinding for Grade Beam and SOG for Management Building ((Grid 6 to 10/A to E).
Inspection to check Concreting SRC,C(16-20) under pile cap second layer PC(144 & 17)
Inspection to Check excavation coordinate and level for front canopies from axis (C) to axis (J)
Inspection to Check Level,Location & Formwork prior to casting blinding concrete under front canopy pil
Inspection to Check Level,Location & Formwork prior to casting blinding concrete under pile cap PC (14
Concrete Pouring of Wall at Ticketing Booth 7.
Drilling works for 6 Mini Piles at Zone-1N (2047,2046,2045,2044,2043 & 2042).
Installation of GEWI Bars & Grouting works for 6 Mini Piles at Zone-1N (2047,2046,2045,2044,2043 &
Drilling works for 6 Mini Piles at Zone-1M (2041,2040,2039,2038,2037 & 2036).
Installation of GEWI Bars & Grouting works for 6 Mini Piles at Zone-1M (2041,2040,2039,2038,2037 &
Application for Anti Termite for Grade Beam and SOG (Grid 6 to 10/A to E) at Management Building.
Concrete Pouring for for Blinding Grade Beam SOG for the highlighted drawing (Grid 6 to 10/A to E).
Top Level and Shutter of Beam.
Foundation coordinates and Top of Blinding for New Ticketing Booth Canopy at Plaza Area.
Inspection of Initial Excavation for Tunnel as per attached drawing.
Concrete Pouring for Grade Beam for Grid (3 to 6/A) at Management Building.
Formworks for Grade Beam at Grid (3 to 6/A) at Management Building.
Wall Alignment for Walls Shutter in Ticketing Booth 7.
Inspection for First Coat application of Cementateous Waterproofing at Boundary Wall (Inner Face) S
Concrete Pouring for Kicker at Span 35 as per attached drawing.
Concrete Pouring for Wall at Span 36 as per attached drawing.
Primer application prior to start Damp Proofing at Ticket Booth 1 (Inside).
Surface Preparation of Footing prior to Start Water Proofing at Ticket Booth 2 (Inside).
Steel Reinforcement for Grade Beam at Management Building Grid A/3 to 6, A to E/3 & E/3 to 6.
1st Coat Damp Proofing at Ticket Booth 1 (Inside) Footing.
2nd Coat Damp Proofing at Ticket Booth 1 (Inside) Footing.
Concrete Pouring for Wall Kicker at Span 23, 24 & 25.
Aborritive works for reconstruct Booulder 104 (done by 2nd Stage Contractor).
Top Level of Shutter for Kicker (Outside) for Boundary Wall Span 36.
Steel Reinforcement for Kicker and Wall at Boundary Wall Span 35.
Top Level of Shutter for Kicker (outside) for Boundary Wall Span 35.
Inspection of coordinate prior to drilling works for 6 mini piles at zone-1L (2025,2034,2033,2032,203
Inspection of coordinate prior to drilling works for 4 mini piles at zone-1C(473,474,475 & 476)
Installation of GEWI Bars and grouting for 4 mini piles at zone-1C (473,474,475 & 476)
Drilling works for 4 mini piles at zone-1C (473,474,175 & 476)
Primer,first and Second coat cementitious water proofing coating for retaining wall foundation from axi
Surface preparation prior to start water proofing for retaining wall foundation from axis AV-axis AO
Inspection of coordinate prior to drilling works for 6 mini piles at zone-1M (2041,2040,2039,2038,20
Inspection of coordinate prior to drilling works for 6 mini piles at zone-1N (2047,2046,2045,2044,20
Installation of drainage pipe (cast iron & upvc) size: 4", 3", 2" as per high lighted in the dwg.
Removal of existing asphalt under boulder 104, 104a, & 103
Notification to proceed with Demolishing of Northern Boundary Wall from Span 57, 58, 59, 60, 61, 64,
Installation of Protection Board for Retaining Wall prior to start Backfilling at Span 46, 47 & 48 as hig
Installation of Protection Board for Retaining Wall prior to start Backfilling at Span 42, 43, 44 & 45 as
Rock and Stone Boulder Placement No. 175A.
Inspection of Clane from Filler Board and Repair for expansion Joint prior to apply Back Rod at Retain
Surface Preparation for Boundary Wall prior to install Riyadh Stone Cladding for Span 82 to 85.
Surface preparation for Boundary Wall prior to install Riyadh Stone Cladding for Span 86 - 89.
Probing & Grouting works at Zone-D,Boundary wall foundation span 49A to 69(95 points) Part-1
Inspection of coordinate prior to probing works at zone-D,Boundary wall foundation span 49A to 69 (
Installation for Riyadh Stone Cladding at Boundary Wall Span 78, 80 & 81.
Installation of rain water pipes CI 100mm, as per high lighted.
Installation of rain water pipes CI 100mm, as per high lighted.
Inspection to check Concreting SRC,C(16-20) under Strip footing between PC (99-101)
Inspection to check Anti Termite prior to casting blinding concrete under Strip footing between PC (99-
Inspection to check Concreting SRC,C(16-20) under Pile caps 15,17 1st layer 144 1st layer
Top Level of Shutter for kicker (outside) for Boundary wall Span 33
Inspection to check Anti Termite prior to casting blinding concrete under Pile caps 15,17 1st layer 144 1
Concrete Pouring for kicker and wall at span 33 of boundary wall
Inspection to Check Level,Location & Formwork prior to casting blinding concrete under strip footing
Steel Reinforcement for kicker and wall at span 33 of boundary wall
Inspection to Check Level,Location & Formwork prior to casting blinding concrete under Pile caps 15,17
Installation of Weatherproof Box for CCTV (Security System) at Site Tower-1 Ground (1pc.) & Roof (10
Inspection of coordinate prior to probing works at zone-B,Water garden boundary wall Foundation (4
Installation of stub-up PVC conduit for CCTV System at boundary wall (Column Span 33) Zone C as pe
Installation of stub-up PVC conduit for Power (CCTV System) at boundary wall (Column Span 33) Zone
Reinforcement SteelBars of wall for ticket booth no.7
Probing & Grouting works at Zone-B Water garden Boundary wall,Foundation (41 Points)
NGL for rock boulder 266
Soil Preparation Under Boulder 104 and 104A and 103
Concrete Pouring for kicker at boundary wall span 34 outside level
Drilling and planting of rebars for grade beam at management building on grids 3-6/A, 3-6/E, 3/A-E
Formworks for damaged footing at grid 18/F(done by 2nd stage contractor)
Concrete Pouring for damaged footing at grid 18/F(done by 2nd stage contractor)
INSPECTION OF CONDENSATE DRAIN 40mm dia & WATER RAIN PIPE 75 mm dia
Inspection of rock investigation under front canopy pile caps prior to start blinding concrete.
Inspection to check Concreting SRC,C(16-20) under front canopy pile caps.
Inspection to check Anti Termite prior to casting blinding concrete under front canopy pile caps.
Inspection to Check Level,Location & Formwork prior to casting blinding concrete under front canopy pil
Inspection of initial excavation for tunnel as per attached drawing.
Shutter and top of kicker for wall (outside) for Boundary wall span 34
Steel Reinforcement for kicker and wall for boundary wall span 34
Request for Demolishion for exsisting boundary wall with conflict with the new design span 48 to 69
Notification to start excavation for foulwater and surface water in crescent
Installation of Protection Bd. 12mm thk On Boundary wall Prior to start Backfilling upto 55 cm. at sp
Mock-up for Grouting color for stone cladding on boundary wall at span 44 outer face (using vitonite
Inspection for Level of Dome Shutters for tickect booth #4
Inspection for Doors and windows opening for Ticket booth #7
Installation of PVC Conduit & Box for Data System at Ticket Booth # 7 Ground Level Area as per atta
Installation of 75mm PVC Conduit & Junction Box for Low Current System at Ticket Booth#7 Ground L
Installation PVC Conduit & Box for Security System at Ticket Booth #7 Ground Level Area as per atta
Installation of PVC Conduit & Switch Box for Fire Alarm System at Ticket Booth # 7 Ground Level Are
Installation of PVC Conduit & Boxes for Power System at Ticket Booth #7 Ground Floor Level area as
Installation of rain water pipes CI 100mm, as per high lighted.
Installation of stub-up PVC conduit for CCTV System at boundary wall (Column Span 36) Zone C as pe
Installation of stub-up PVC conduit for Power (CCTV System) at boundary wall (Column Span 36) Zone
Installation of PVC conduit & Weatherproof Box for CCTV System at Boundary Wall Zone E as per atta
Mock up Installation of conduit and box (400x300x210mm & 100x100x47mm) for CCTV System at boun
Inspection to check Concreting SRC,C(16-20) under Strip footing between PC(101) &PC(103).
Inspection to check Anti Termite prior to casting blinding concrete under Strip footing between PC(101
Inspection to Check Level,Location & Formwork prior to concrete casting under Strip footing between
Top Level of Kicker for Boundary wall (wall) span 26,27,28
Concrete Pouring for Kicker of wall in boundary wall span 26,27,28
Steel Reinforcement for Kicker and wall for boundary wall span 26,27,28
Installation of Conduit & Weatherproof Box for Power System (CCTV) Layout at Boundary Walls Zone
Drilling and installation of Rebar for the damaged footing Grid 18/F at Managemenrt Building (done
Chipping of loose and damaged concrete at footing grid 18/F in Management Building prior to start R
Concrete Pouring for blinding at SOG (Toilet 3) except EE room
Application of Membrane single layer on Boundary wall span 46,47,48
Installation of Protection board for water proofing at foundation of Management Building at grids 3/P
Application of Membrane single layer on Boundary wall span 2,3,4
Application of Membrane single layer on Boundary wall span 16,17,18
Surface Preparation Prior to Proceed water proofing (inner face) foundation of retaining wall of span
Probing & Grouting works at Zone-B,Water garden boundary wall foundation (10 points)
Probing & Grouting works at Zone-B,Water Garden boundary wall foundation (54 points)
Installation of rain water pipes CI 100mm, as per high lighted.
Inspection of coordinate prior to probing works at zone-B,Water Garden boundary wall foundation(10
Inspection of coordinate prior to probing works at zone-B,Water Garden Boundary Wall foundation (5
Setting-out and Laying of CMU (1st Layer) for Internal Wall as per attached drawing of Toilet 5, Groun
Coordinates and Top of Kicker for wall at Ticket Booth # 7
Removal of CMU installed at Toilet # 1 as per KAIG3-NCR-GN-G-0002-00
Application of anti termite prior to blinding at SOG (Toilet 3) except EE room
Installation of stub-up PVC conduit for CCTV System at boundary wall Zone C as per highlighted atta
Installation of stub-up PVC conduit for Power (CCTV System) at boundary wall Zone C as per highligh
Surface preparation prior to start water proofing for footing (inside) at Ticket Booth 3
Concrete Pouring for Boundary wall footing at span 21
Steel Reinforcement for Boundary wall footing at span 21
Shutter and Level for Boundary wall footing at span 21
Installation of GEWI Bars and grouting workk for 6 mini piles at zone-1F (517,518,519,520,521 & 522)
Drilling works for 6 mini piles at zone-1F (517,518,519,520,521 & 522)
Installation of GEWI Bars and grouting works for 4 mini piles at zone-1D (151,152,153 & 154)
Drilling works for 4 mini piles at zone-1D (151,152,153 &154)
Inspection of coordinate prior to drilling works for 4 mini piles at zone-1D,(151,152,153 & 154)
Inspection of coordinate prior to drilling works for 6 minipiles at zone-1F,(517,518,519,520,521 & 522
Mock up Installation of conduit and box for CCTV System at boundary wall Zone E as per highlighted
Installation of PVC Conduit & Boxes for Airconditioning Unit at Ticket Booth #5 Roof Level (DOME) Ar
Core Opening for mechanical opening at Security and fire control Building as per attached DWG
Surface Preparation Prior to Start Damp Proofing of Boundary wall (inner Face) Span 76-77
Concrete Pouring of Blinding for Grade Beam and SOG (Grid 10-18 / B-E) of Management Building
Application of Anti Termite for Grade Beam and SOG (Grid 10-18 / B-E) of Management Building
Notification to start Boulders no. 265B and 265A
Notification to start Boulders no. 247
Notification to start Boulders no. 267
Installation of Stone Cladding for Concrete Boundary Wall Outer Face (except column), Wall Spann 77
Highlighted drawings showing structural repairing area prior to proceed with reparing works - Site To
Concreting for Kicker at Ticket Booth # 7
Shuttering for Kicker at Ticket Booth # 7
Concrete Pouring of Slab for ticket booth #5
Concrete Pouring of Exsisting Footing for ticket booth #7
Surface preparation prior to start water proofing for footing (inside) at Ticket Booth 1
Top Level of Blinding for SOG for Management Building (Grid 10 to 18 / B to E)
INSPECTION OF 2 PCS. RAINWATER PIPES SLEEVE (UPVC CLASS 4) 110mm dia. AND 1 PC. SLEEVE PI
Top Level of Backfill Prior to Cast Blinding for SOG for Management Building (Grid 10 to 18 / B to E)
Installation of GEWI Bars and grouting works for 6 mini piles at zone-2J (596,597,598,599,664 & 665)
Drilling works for 6 mini piles at zone-2J (596,597,598,599,664 & 665)
Installation of GEWI Bars and groutingworks for 4 mini piles at zone-2H (600,601,602 & 603)
Drilling works for 4 mini piles at zone-2H (600,601,602 & 603)
Inspection to check Concreting SRC,C(16-20) under pile cap no PC(23) 4th layer.
Inspection to check Concreting SRC,C(16-20) under pile cap no PC(32).
Inspection to check Anti Termite prior to casting blinding concrete under pile cap no PC(32).
Inspection to Check Level of Back filling 2nd layer under North small mosque foundation.
Inspection to Check Level,Location & Formwork prior to concrete casting under pile cap no. PC(23) 4th l
Inspection to Check Level,Location & Formwork prior to concrete casting under pile cap no. PC(32).
Steel Reinforcement for Wall at Span 36.
Concrete Pouring for Kicker at Boundary Wall Span 36.
Shutter and Top Level of Kicker for Boundary Wall Span 36.
Top Level of Blinding Concrete before SOG for Toilet 3.
Mock up Installation of conduit and box (400x300x210mm & 100x100x47mm) for CCTV System at boun
Wall Coordinates and Top Kicker for Ticket Booth 7.
Shutter and top level of kicker for boundary wall span 23,24,25
Steel Reinforcement for Kicker at Boundary wall Span 23, 24, 25
Shutter of wall and top level of concrete at span 38 for Boundary wall
Concrete Pouring of wall at span 38 for Boundary wall
Final Coat of Cementateous Water Prooofing for Boundary Wall (Span 78, 79 and 82 to 89).
Coordinates of Footing and Top Level of Footing for Boundary Wall Span 19, 20 & 21.
Reinforcement Steel Bars of Footing for Ticket Booth 7.
Reinforcement Steel Bars of Slab for Ticket Booth 5.
Installation of earthing clamps with conductor 70mm² for earthing reinforcement steel re-bar at Tic
Application of single layer membrane at boundary wall span 42, 43, 44, 45
Pouring of Concrete for Ramp at Toilet #2
Mock-up of Cementateous coating (3rd coat) at Boundary wall span 79 inner face
Steel Reinforcement for Boundary wall footing at span 19, 20, 21
Concrete Pouring for Boundary wall footing at span 19, 20, 21
Soil Preparation under Boulder (251 & 252).
Installation of Rock and Boulder no. 266.
Application of Primer Coat on Boundary Wall for Waterproofing prior to install Membrane 4mm. Span n
Installation of GEWI Bars and grouting works for 8 mini piles at zone-2L (212,213,214,215,220,221,2
Drilling works for 8 mini piles at zone-2L (212,213,214,215,220,221,222 & 223)
Installation of PVC conduit & boxes for Lighting System at Ticket Booth #5 roof level as per highlight
Visual inspection of PVC conduit & box for Fire Alarm System at Ticket Booth #5 roof level as per hig
Inspection to check Concreting SRC,C(16-20)under pile cap PC(23) third layer.
Inspection to Check Level,Location & Formwork prior to concrete casting under pile cap PC(23)Third lay
Inspection to check Surface preparation prior to water proofing for Retaining wall foundation crecent -1(
Inspection to check Concreting SRC,C(16-20)under strip footing between PC(97-99).
Inspection to check Anti Termite prior to casting blinding concrete under strip footing between PC(97-99
Inspection to Check Level,Location & Formwork prior to concrete casting under strip footing between PC
Inspection of coordinates prior to drilling works for 8 mini piles at zone-2L(212,213,214,215,220,221,2
Installation of GEWI Bars and grouting for 6 mini piles at zone-1E (499,500,501,502,503 & 504)
Drilling works for 6 mini piles at zone-1E (499,500,501,502,503 & 504)
Installation of GEWI Bars and grouting for 4 mini piles at zone-1D (495,496,497 & 498)
Drilling works for 4 mini piles at zone-1D (495,496,497 & 498)
Notification to start Boulders no. 137
Notification to start Boulders no. 266, 265, 263, 243, 245
Alignment of Shutter for wall at ticket booth # 6
Concrete Pouring of wall at Ticket Booth #6
Levels and coordinates for Boulder no. 263
Installation of PVC conduit & Weatherproof Box for CCTV System at Boundary Wall Zone E as per atta
Top level of Blinding and Top of Backfilling for Toilet 2 Ramp.
Installation of Conduit & Weatherproof Box for Power System (CCTV) Layout at Boundary Walls Zone
Inspection of coordinates prior to drilling works for 4 mini piles at Zone-1D (495,496,497 & 498).
Inspection of coordinates prior to drilling works for 6 mini piles at Zone-1E (499,500,501,502,503 & 5
Inspection of coordinates prior to drilling works for 4 mini piles at Zone-2H (66,601,602 & 603).
Inspection of coordinates prior to drilling works for 6 mini piles at Zone-2J (596,597,598,599,664 & 66
Inspection for 2nd Coat application of Cementateous Water Proofing at Span 86 to 89.
Top level of Concrete as per attached drawing (Toilet 4).
Pouring of Concrete for SOG at Toilet #4
Top of Slab for Ticket booth no. 5
Steel Reinforcement for Slab on Grade as per attached Drawing (toilet 4) 2nd part
Notification to start Grading and Leveling for the attached Drawing
Installation of GEWI Bars and grouting works for 14 mini piles at zone-1E (141,142,143,144,145,146
Drilling works for 14 mini piles at zone-1E (141,142,143,144,145,146,147,148,149,150,509,510,511 &
Installation of GEWI Bars and grouting works for 4 mini piles at zone-1F (131,132,133 & 134)
Drilling works for 4 mini piles at zone-1F (131,132,133 & 134)
Installation of GEWI Bars and grouting works for 4 mini piles at zone-1G (117,118,119 & 120)
Drilling works for 4 mini piles at zone-1G (117,118,119 & 120)
Installation of GEWI Bars and grouting for 4 mini piles at zone-1H (109,110,111 & 112)
Drilling works for 4 mini piles at zone-1H (109,110,111 & 112)
Concrete Pouring of Blinding for Grade Beam (Grid 3-6 / A-E) of Management Building
Inspection for 2nd coat damp proofing for foundation for Management Building at grids 3/P, 3/R, 4/P,
Application of Anti Termite for Grade Beam (Grid 3-6 / A-E) of Management Building
Top Level of Concrete for Wall at Boundary wall Span 37
Concrete Pouring for wall at Boundary wall Span 37
Surface Preparation for Boundary Wall Prior to install Riyadh Stone Cladding for Span 82 to 85
Surface Preparation for Boundary Wall prior to install Riyadh Stone Cladding for Span 78 to 85.
INSPECTION OF CONDENSATE DRAIN 40mm dia & WATER RAIN PIPE 75 mm dia
Installation of PVC Conduit & Box for Data System at Ticket Booth # 6 Ground Level Area as per atta
Installation of 75mm PVC Conduit & Junction Box for Low Current System at Ticket Booth#6 Ground L
Installation PVC Conduit & Box for Security System at Ticket Booth #6 Ground Level Area as per atta
Installation of PVC Conduit & Switch Box for Fire Alarm System at Ticket Booth # 6 Ground Level Are
Installation of PVC Conduit & Boxes for Power System at Ticket Booth #6 Ground Floor Level Area as
Inspection of formation level prior to casting concrete under strip footings(97-99)(99-101)&(101-103)
Inspection of backfilling for first layer of north small mosque footing as per attached table.
Inspection of rock investigation prior to casting concrete under strip footing between pile caps (99-97)
Inspection of coordinate prior to drilling works for 4 mini piles at zone-1H(109,110,111 &112)
Inspection of coordinate prior to drilling works for 4 mini piles at zone -1F(131,132,133 &134)
Inspection of coordinate prior to drilling works for 14 mini piles at zone 1E(141,142,143,144,145,1
Inspection of coordinate prior to drilling works for 4 mini piles at zone -1G(117,118,119 &120)
Concrete Pouring for Kicker at Booundary Wall Span 38.
Soil Preparation Under Boulder 136 & 137
Top Level of Concrete for Kicker at Boundary wall Span 38
Concrete Pouring for Blinding for Ramp Area at Toilet 2
Notification to start excavation for site non-potable and site potable water distribution (as per attac
Inspection of 1st Coat Damp Proofing Prior to apply 2nd coat for Span 83 to 84 Inner Side.
Inspection for 2nd Coat application of Cementateous water proofing at Span 86 and 89.
Installation of Stone Cladding for Concrete Boundary Wall outer face (except column), wall span 77 to
Inspection to check Concreting SRC,C(16-20) under pile cap PC(23-2nd layer & 160-3rd layer).
Inspection to Check Level,Location & Formwork prior to concrete casting under pile cap PC(23-2nd layer
Inspection for Doors and windows opening for Ticket booth #6
Inspection for Level of Dome Shutters for tickect booth #3
Application of Anti Termite for SOG (Grid 3-6 / A-E) of Management Building
Installation of GEWI Bars and grouting works for 14 mini piles at zone-2K (240,241,242,243,244,245
Concrete Pouring of Blinding for SOG (Grid 3-6 / A-E) of Management Building
Inspection for 1st coat damp proofing for foundation for Management Building at grids 3/P, 3/R, 4/P,
Top Level of blinding for SOG at Management Building grid 03-06/A-E
Drilling works for 14 mini piles at zone-2K (240,241,242,243,244,245,246,247,248,249,250,251,252 &
Installation of GEWI Bars & Grouting works for 10 mini piles at zone-2L (204,205,206,207,228,229,2
Drilling works for 10 mini piles at zone-2L (204,205,206,207,228,229,230,231,232 & 233)
Coordinate of wall and Top level of Footing for Ticket Booth 6.
Appication of Primer Coat on Boundary Wall for Waterproofing; Span 42 & 45, done by 2nd stage con
Inspection of 2nd Coat Damp Proofing at Boundary Wall for Span 83 to 84 Inner Side.
Application of Primer Coat of Water Proofing for Boundary wall at Span 43,46,47 & 48.
Application of Anti Termite prior to Blinding at Ramp area in Toilet 2.
Reinforcement Steel Bars of Wall at Ticket Booth 6.
Inspection to check Surface preparation prior to water proofing for PC no (100,101,102,103,104,105,10
Installation of GEWI Bars and grouting works for 14 mini piles at zone-2M (190,191,192,193,194,19
Drilling works for 14 mini piles at zone-2M (190,191,192,193,194,195,196,197,198,199,200,201,202
Installation of GEWI Bars and grouting works for 16 mini piles at zone-1H (91,92,93,94,95,96,97,98,
Drilling works for 16 mini piles at zone-1H (91,92,93,94,95,96,97,98,325,326,327,328,329,330,331 &3
Inspection of coordinate prior to drilling works for 14 mini piles at Zone-2K(240,241,242,243,244,2
Inspection of coordinate prior to drilling works for 10 mini piles at Zone-2L(204,205,206,207,228,22
Inspection of coordinate prior to drilling works for 14 mini piles at Zone-2M(190,191,192,193,194,
Setting out and laying of CMU (1st layers) for Internal Wall as per attached drawing of Toilet 5, Groun
Soil Preparation Under Boulder 265a, 265b, 262a
Inspection of 2ND coat Damp Proofing Prior to apply 2nd coat for span 79 to 82 inner side
Top Level of Backfill Prior to Cast Blinding for SOG for Management Building (Grid 3 to 6 / A to E)
Inspection for 1st coat damp proofing for foundation for Management Building at grids 3/P, 3/R, 4/P,
Inspection to check Surface preparation prior to water proofing for PC no (90,88 & 86)
Inspection to check Concreting SRC,C(16-20) under pile cap PC(24-3rd layer,26 -2nd layer & 160-2nd laye
Inspection to Check Level,Location & Formwork prior to concrete casting under pile cap PC(24-3rd layer
Concrete Pouring for Dome at Ticket booth No. 3
Reinforcement Steel Bars for Dome at Ticket booth No. 3
Top Level of Concrete as per attached Drawing (Toilet No. 4)
Inspection of coordinate prior to drilling works for 16 mini piles at Zone-1H,(91,92,93,94,94,95,96,
Steel Reinforcement for Slab on Grade as per attached Drawing (toilet 4)
Surface Preparation for additional Block & Topping Beam prior to apply water proofing at manageme
Installation of GEWI Bars and groutingworks for 18 mini piles at zone-2N (850,851,852,853,854,855
Drilling works for 18 mini piles at zone-2N (850,851,852,853,854,855,856,857,858,859,860,861,890,
Installation of GEWI Bars and grouting works for 4 mini piles at zone-2M (862,863,864 & 865)
Drilling works for 4 mini piles at zone-2M (862,863,864 & 865)
Installation of GEWI Bars and grouting works for 14 mini piles at zone-1G (309,310,311,312,313,314
Drilling works for 14 mini piles at zone-1G (309,310,311,312,313,314,315,316,523,524,525,526,527 &
Inspection of coordinate prior to probing works at Zone-C,Boundary wall Foundation span 19 to 22 (2
Top Level of Blinding and Top of Backfilling for Toilet 2 Ramp.
Inspection of Primer Coat Damp Proofing prior to apply 1st coat for span 85 to 89 inner face.
Probing & Grouting works at zone-C,Boundary wall Foundation span 19 to 22 (20 points)
Surface preparation prior to proceed with water proofing for inner side foundation and retaining wall
Installation of GEWI Bars and grouting works for 14 mini piles at zone-2N (882,883,884,885,896,897
Drilling works for 14 mini piles at zone-2N (882,883,884,885,896,897,898,899,900,901,902,903,904 &
Installation of GEWI Bars and grouting works for 12 mini piles at zone-2M (570,571,572,573574,575
Drilling works for 12 mini piles at zone-2M (570,571,572,573,574,575,576,577,906,907,908 &189)
Installation of GEWI Bars and grouting works for 4 mini piles at zone-1H (317,318,319 & 320)
Drilling works for 4 mini piles at zone-1H (317,318,319 & 320)
Probing & Grouting works at Zone-C,Ticket Boot Canopy Foundation (32 Points)
Inspection of coordinate prior to probing works at zone-C, Ticket Boot canopy Foundation (32 Points)
Installation of GEWI Bars and grouting works for 4 mini piles at zone-1F (545,546,547 & 548)
Drilling works for 4 mini piles at zone-1F (545,546,547 & 548)
Coordinate of wall and Top level of Footing for Ticket Booth 6.
Inspection of 1st Coat Damp Proofing prior to apply 2nd coat for span 79 to 82 inner side.
Notification to start Excavation for Site lifting station pipe network.
Setting out and Laying of CMU (1st layer) for Internal Wall as per attached drawing of Tower 3, Groun
Inspection to check Concreting SRC,C(16-20) under pile cap PC(26 & 160) First layer.
Inspection to check Anti Termite prior to casting blinding concrete under pile cap PC(26 & 160) First laye
Inspection to Check Level,Location & Formwork prior to concrete casting under pile cap PC(26 & 160) Fir
NGL for Rock Boulders (122,123,124,125,126,129 & 130).
External Plaster for all elevation at Toilet 2.
Inspection of coordinate prior to drilling works for 18 mini piles at zone-2N (850,851,852,853,854
Top Level of SOG at Tower 5.
Inspection of coordinates prior to drilling works for 4 mini piles at Zone-2M (862,863,864 & 865)
Concrete Pouring of Kicker for Ticket Booth 6.
Installation of GEWI Bars and grouting for 4 mini piles at zone-2K (578,579,660 & 661)
Drilling works for 4 mini piles at zone-2K (578,579,660 & 661)
Installation of GEWI Bars and grouting works for 14 mini piles at zone-2L (208,209,210,211,224,225
Wall Coordinates and Top of Kicker for Ticket Booth 6.
Drilling works for 14 mini piles at zone-2L (208,209,210,211,224,225,226,227,234,235,236,237,238 &
Steel Reinforcement Bars of SOG at Tower 5.
Concrete Pouring of SOG at Tower 5.
Inspection of coordinate prior to drilling works for 12 mini piles at zone-2M (570,571,572,573,574,
Shutter form of Kicker of Wall for Ticket Booth 6.
Inspection of coordinate prior to drilling works for 14 mini piles at zone-2N (882,883,884,885,896,
Installation of Weatherproof Box for CCTV (Security System) at Site Tower-1 Ground (1pc.) & Roof (10
Mock-up for Grouting Color of Stone Cladding on Boundary Wall (Color of Grout 65 from Vetonite) Sa
Inspection for 1st Caot application of Cementateous Water Proofing at Span 86 to 89.
Surface Preparation for highlighted footing in the attached drawing prior to apply Waterproofing a
Investigation for NGL prior to start Backfilling under Stone Rock Boulders no. 242,243,245,246 & 247.
Concrete Pouring for Footing at Ticket Booth 6.
Second Coat for Damp Proof Coating of Boundary Wall (Inner Face) at Span 78.
Installation of earthing clamps with conductor 70mm² for earthing reinforcement steel re-bar at Tic
Inspection to check Concreting SRC,C(16-20) under pile cap PC(23) First layer.
Inspection to check Anti Termite prior to casting blinding concrete under pile cap PC(23) First layer.
Inspection to check Concreting SRC,C(16-20) under pile cap PC(154) fourth layer.
Inspection to check Concreting SRC,C(16-20) under pile cap PC(24) second layer.
Inspection to Check Level,Location & Formwork prior to concrete casting under pile cap PC(23) first laye
Inspection to Check Level,Location & Formwork prior to concrete casting under pile cap PC(154) fourth l
Inspection to Check Level,Location & Formwork prior to concrete casting under pile cap PC(24) second l
Inspection for 2nd Coat Application of Cementateous Water Proofing at Span 77 to 85.
Closing of Shutter and Casting of Concrete for Kicker of Boundary Wall at Span 37.
Primer Coat for Damp Proofing Coat of Boundary Wall (Inner Surface) at Span 83 and 84.
Inspection of coordinate prior to probing works at zone-D, North Culvert (53 Points) part-3
Probing & Grouting works at Zone-D,North Culvert (53 Points) Part-3
Inspection of coordinates prior to drilling works for 4 mini piles at zone-2K (578,579,660 &661)
Installation of GEWI Bars and grouting for 4 mini piles at zone-2L (216,217,218 & 219)
Drilling works for 4 mini piles at zone-2L (216,217,218 & 219)
Inspection of coordinate prior to drilling works for 14 mini piles at zone-2L(208,209,210,211,224,2
Closing of Core opening around the Electrical pipe by using LA extra - Toilet 2.
Closing of Core opening around the Electrical pipe by using LA extra - Toilet 1.
Investigation for NGL prior to start backfilling under stone rock boulders no. 137.
Blinding Concrete for Toilet 4.
Primer Coat for Damp Proof Coating of Boundary Wall (Inner Face) at Span 78,80,81 & 82.
Coordinates and Bottom Level for Boulder 265.
Drilling works for 20 mini piles at zone-1D (155,156,157,158,159,160,161,162,163,164,485,486,487,
Installation of GEWI Bars and grouting works for 20 mini piles at zone-1D (155,156,157,158,159,16
Installation of GEWI Bars and grouting works for 12 mini piles at zone-2J (254,255,256,257,258,259,
Drilling works for 12 mini piles at zone-2J (254,255,256,257,258,259,260,261,592,593,594 & 595)
Inspection of coordinates prior to drilling works for 4 mini piles at zone-1H (317,318,319 & 320)
Inspection of coordinates prior to drilling works for 4 mini pile at zone-1F (545,546,647 &548)
Inspection of coordinate prior to drilling works for 14 mini piles at zone-1G(309,310,311,312,313,3
Inspection to check Concreting SRC,C(16-20) under pile caps (152 third layer)&(158 second layer).
Top of Concrete Slab on Grade at Ramp for Tower 2.
Steel Reinforcement for Boundary Wall at Span 37.
Inspection to Check Level,Location & Formwork prior to concrete casting under pile caps (152 third laye
Top Level of Slab for Ticket Booth 4.
Inspection for Alignment of Wall for Ticket Booth 5.
Installation of GEWI Bars and grouting works for 10 mini piles at zone-2H (272,273,274,275,276,277
Drilling works for 10 mini piles at zone-2H (272,273,274,275,276,277,278,279,280 &281))
Concrete Pouring of Wall for Ticket Booth 5.
Probing & Grouting works at Zone-D,North culvert (68 Points) Part-2
Inspection of coordinate prior to probing works at zone-D,North culvert (68 Points) part-2
Probing & Grouting works at Zone-D,North Culvert (98 Points) Part-1
Inspection of coordinate prior to probing works at zone-D ,North culvert (98 points) part-1
Inspection of coordinate prior to drilling works for 12 mini piles at zone-2J (254,255,256,257,258,2
Installation of Stone Cladding for Concrete Boundary Wall outer face (except column), Wall Span 86,
Application of Anti Termite prior to cast Blinding Concrete for Toilet 4.
Concrete Pouring C (32/40) Severe Exposed for Ramp SOG at Tower 2.
Reinforcement Steel Bars for Ramp SOG at Tower 2.
Inspection of coordinate prior to drilling works for 20mini piles at zone-1D(155,156,157,158,159,1
Installation of GEWI Bars and grouting works for 8 mini piles at zone-2G (282,283,284,285,286,287,2
Drilling works for 8 mini piles at zone-2G (282,283,284,285,286,287,288 & 289))
Installation of GEWI Bars and grouting works for 10 mini piles at zone-2F (296,297,298,299,308,669,
Drilling works for 10 mini piles at zone-2F (296,297,298,299,308,669,670,671,672 & 673)
Inspection of coordinate prior to drilling works for 10 mini piles at zone-2H(272,273,274,275,276,27
Top level of Blinding Concrete for Toilet 4.
Concrete Pouring for Slab of Ticket Booth 4.
Sandblasting for starter bars from Span 23 to 32 (Boundary Wall).
Installation of PVC Conduit & Boxes for Airconditioning Unit at Ticket Booth #4 Roof Level (DOME) Ar
Inspection to check Concreting SRC,C(16-20) under pile cap 156 third layer.
Inspection to Check Level,Location & Formwork prior to concrete under pile cap 156 third layer.
Inspection for rock surface level for the north small mosque building prior to start the backfilling to t
Inspection to check Concreting SRC,C(16-20) under retaining wall footings from axis AV to axis AO
Inspection to check Anti Termite prior to casting blinding concrete under retaining wall footings from ax
Inspection to Check Level,Location & Formwork prior to concrete under retaining wall footings from axi
Inspection of coordinates prior to drilling works for 08 mini piles at Zone-2F (282,283,284,25,286,28
Inspection of coordinates prior to drilling works for 10 mini piles at Zone-2F (296,297,298,299,308,6
Inspection of initial excavation for MCPE-3 as per attached drawing excavation has done as per the siz
Drilling works for 12 mini piles at zone-2F, (556,557,558,559,560,561,562,563,620,621,622,& 623 ).
Installation of GEWI Bars and grouting works for 10 mini piles at zone-2F (612,613,614,615,656,657,
Drilling works for 10 mini piles at zone-2F (612,613,614,615,656,657,658,659,668 & 69))
Installation of GEWI Bars and grouting works for 12 mini piles at zone-2F (556,557,558,559,560,561
Installation of PVC Conduit & Boxes for Power System at Ticket Booth #5 Ground Floor Level Area as
Installation of PVC Conduit & Box for Data System at Ticket Booth # 5 Ground Level Area as per atta
Installation of 75mm PVC Conduit & Junction Box for Low Current System at Ticket Booth#5 Ground L
Installation PVC Conduit & Box for Security System at Ticket Booth #5 Ground Level Area as per atta
Installation of PVC Conduit & Switch Box for Fire Alarm System at Ticket Booth # 5 Ground Level Are
Inspection for Top of Backfilling of SOG at Tower 5.
Inspection for Cementateous Water Proofing (First Coat) prior to apply 2nd Coat at Span 77, 78 & 79.
Investigation for NGL prior to start backfilling under Stone Rock Boulders no. 242,243,245,246 & 247.
Steel Reinforcement for Boundary Wall at Span 38.
Inspection to check Concreting SRC,C(16-20) under pile cap PC(154)Third layer..
Laying of CMU (6 layers) for Internal Wall as per attached drawing of Tower 2, Ground Floor.
INSPECTION OF 2 PCS. RAINWATER PIPES SLEEVE (UPVC CLASS 4) 110mm dia. AND 1 PC. SLEEVE PI
INSPECTION OF CONDENSATE DRAIN 40mm dia & WATER RAIN PIPE 75 mm dia
Laying of CMU (1st Layers) for Internal Wall as per attached drawing of Tower 3, Ground Floor.
Reinforcement Steel Bars (Starter Bars) for Wall of Ticketing Booth 6.
Reinforcement Steel Bars and Shutter for Footing of Ticketing Booth 6.
Inspection of Reinforcement for Roof Slab as per attached Drawing for Ticket Booth 4.
Reinforcement Steel Bars of wall for Ticket Booth 5.
Inspection to Check Level,Location & Formwork prior to concrete casting under pile cap PC(154)Third lay
Application of Cementateous water proofing (1st Coat) prior to apply 2nd coat for span 80,81,82,83,
Installation of PVC conduit & box for Fire Alarm System at Ticket Booth #4 roof level as per highlight
Installation of PVC conduit & boxes for Lighting System at Ticket Booth #4 roof level as per highlight
Inspection for Doors and windows opening for Ticket Booth 5.
Inspection for Alignment of wall for Ticket Booth 5.
Probing and Grouting works at Zone-G, Butterfly Garden Foundation (74 Point).
Probing and Grouting works at Zone-G, Butterfly Garden Foundation (37 Point).
Concrete pouring of blinding at SOG for Tower 5.
Core opening for Tower 2 - SCR no. KAIG3-SCR-TT-G-0053-00.
Core opening for Tower 3 - SCR no. KAIG3-SCR-TT-G-0053-00.
Core opening for tower 5 - SCR no. KAIG3-SCR-TT-G-0053-00.
Inspection of coordinates prior to drilling works for 10 mini piles at zone -2G (612,613,614,615,69,6
Inspection of coordinates prior to drilling works for 12 mini piles at zone 2-F(556,557,558,559,560,
Installation of GEWI Bars and grouting for 10 mini piles at zone-2E (632,633,634,635,640,641,642,64
Drilling works for 10 mini piles at zone-2E (632,633,634,635,640,641,642,643,72 & 73)
Probing & Grouting works at Zone-G,Discovery Garden Foundation (85 Points)
Inspection to check Concreting SRC,C(16-20) under pile caps (162,164)Crescent -2 & PC(25) Crecent-1. Th
Inspection to check Anti Termite prior to casting blinding concrete under pile caps (162,164)
Inspection to Check Level,Location & Formwork prior to concrete under pile caps (162,164)Crescent -2 &
Installation of GEWI bars and grouting works for 18 mini piles at zone-2E, (674,675,676,677,678,679
Drilling works for 18 mini piles at zone-2E, (674,675,676,677,678,679,680,681,682,683,684,685,710,711,
Inspection of coordinate prior to probing works at zone-G, Discovery Garden Foundation (85 Points)
Application of Anti Termite prior to cast blinding for SOG at Site Tower 5.
Excavation to expose selected footing of Management Building as per attached highlighted drawin
Installation of GEWI Bars and grouting works for 18 mini piles at zone-2D (686,687,688,689,690,69
Drilling works for 18 mini piles at zone-2D (686,687,688,689,690,691,692,693,694,695,696,697,716,
Installation of GEWI Bars and grouting for 10 mini piles at zone-2D (550,551,552,553,554,555,652,65
Drilling works for 10 mini piles at zone-2D (550,551,552,553,554,555,652,653,654 & 655)
Inspection of coordinate prior to drilling works for 10 mini piles at zone-2E (632,633,634,635,72,73,
Inspection to check Concreting SRC,C(16-20) under PC(24).
Inspection to check Anti Termite prior to casting blinding concrete under PC(24).
Installation of earthing clamps with conductor 70mm² for earthing reinforcement steel re-bar at Site
Surface preparation prior to proceed with water proofing for inner side foundation and retaining wall
Surface preparation prior to proceed with water proofing for inner side foundation and retaining wall
Surface Preparation prior to proceed with water proofing for inner side foundation and retaining wall
Investigation for NGL prior to start backfilling under stone rock boulders no. 265,275,254 at zone-1
Notification to start demolition for edge beam as per attaced highlighted drawing at Management Bui
Level and Coordinates for Boulder no. 113 to 121 & 266.
Inspection to check Concreting SRC,C(16-20) under pile caps (25) second layer,& (152,154 & 156)second
Inspection to Check Level,Location & Formwork prior to concrete under pile caps (25,152,154 &156)Sec
Core opening on the wall as per attached drawing for Plumbing pipe (Mechanical size 160mm).
Notification to proceed with excavation to expose the highlighted foundation in the attached drawing
Inspection to check Concreting SRC,C(16-20)under strip footings between PC(77-79)to PC(79-81) Second
Inspection to Check Level,Location & Formwork prior to concrete under strip footings between PC(77-7
Concrete Pouring for Ramp as per attached drawing for Toilet 1.
Setting out and Laying of CMU (1st Layers) for Internal Wall as per attached drawing of Toilet 5, Grou
Rough Coat before Plaster external Elevation at Toilet 2.
Shuttering for Ramp as per attached drawing at Toilet 1.
Top Level of Concrete for Ramp as per attached drawing at Toilet 1.
Steel Reinforcement for Ramp at Toilet 1.
Steel Reinforcement for Stiffener and Lintel Beam of Toilet 1, Ground Floor.
Inspection of coordinate prior to drilling works for 4 mini piles at zone-2C,(698,699,700 &701)
Inspection of coordinate prior to drilling works for 18 mini piles at zone-2E,(674,675,676,677,678,
Inspection of coordinates prior to drilling works for 10 mini piles at zone -2D (550,551,552,553,554,
Inspection of coordinates prior to drilling works for 18 mini piles at zone-2D (686,687,688,689,69
Installation of GEWI Bars and grouting works for 22 mini piles at zone-2C (698,699,700,701,702,70
Drilling works for 22 mini piles at zone-2C (698,699,700,701,702,703,704,705,776,777,778,779,780,
Installation of GEWI Bars and grouting works for 4 mini piles at zone-2B (772,773,774 & 775)
Drilling works for 4 mini piles at zone-2B (772,773,774 & 775))
Notification to remove existing stone cladding (outer face) - at span (68,69,70 & 71) - done by 2nd st
Core Opening at Electrical area Service for Toilet 4.
Core Opening at Electrical area Service for Toilet 5.
Inspection to check Concreting SRC,C(16-20)under strip footings between PC(77-79)to PC(79-81)from a
Inspection to check Anti Termite prior to casting blinding concrete under strip footings between PC(7
Inspection to check Concreting SRC,C(16-20) under PC (156,158) & (24,25) First layer and PC(27).
Inspection to check Anti Termite prior to casting blinding concrete under PC (156,158) & (24,25) First la
Inspection to Check Level,Location & Formwork prior to concrete under strip footings between PC(77-
Inspection to Check Formation Level prior to casting blinding concrete under strip footings between
Inspection to Check Level,Location & Formwork prior to concrete casting under Pile caps PC (156,158) &
Level of concrete fro Slab on Grade at Site Tower 3.
Inspection of Spatter Dash (Rough Coat and Setting Out of Plaster (Guideline) for Tower 1 - as shown
Probing & Grouting works at Zone-G,Sound & Light Garden Foundation (82 Points) Part-3
Probing & Grouting works at Zone-G,Sound & Light Garden Foundation (82 Points) Part-2
Probing & Grouting works at Zone-G, Sound & Light Garden Foundation (85 Points) Part-1
Concreting for Slab on Grade at Site Tower 3 (32/40 Severe Exposed).
Steel Reinforcement for Slab on Grade at Site Tower 3.
Application of Anti Termite for Ramp of Site Tower 2.
Settig out and Laying of CMU (1st Layer) for Internal Wall as per attached drawing of Towwer 2, Grou
Concreting for Ramp of Site Tower 2.
External Plaster for all Elevation at Toilet 1.
Inspection to check Concreting SRC,C(16-20) under PC (140,142,148,150)(152,154) First layer.
Inspection to check Anti Termite prior to casting blinding concrete under PC (140,142,148,150)(152,154)
Inspection to Check Level,Location & Formwork prior to concrete casting under Pile caps PC (140,142,14
Inspection to check coordinates of boreholes for grouted rock cores.
Investigation for NGL prior to Staart Backfilling under Stone Rock Boulders (113,114,115,117,118,11
Level and Coordinate for Boulder no. 261.
Inspection of initial excavation for MCPE 3 as per attached drawing (Excavation has done as per the siz
Inspection of coordinate prior to probing works at zone-G, sound & light garden(82 Points)Part-3
Inspection of coordinate prior to probing works at zone-G, sound & light garden(82 Points)part-2
Cosmetic Repair using HS extra at external elevation for Toilet 5.
Inspection of coordinate prior to probing works at zone-G, sound & light garden (85 Points)Part-1
Inspection of coordinates prior to probing works at zone-G,Energy center-2 (1 point) part-4
Highlighted Drawings showing Structural repairing area prior to proceed with repairing works - Site T
Reinforcement (Starter Bars) for Wall of Ticketing Booth 5.
Inspection for Level of Backfilling for Ramp at Site Tower 3.
Probing & Grouting works at zone-G, Energy center-2 Foundation (99 Points) Part-3
Probing & Grouting works at zone-G,Energy center-2 Foundation (87 Points) Part-1
Probing & Grouting works at zone-G Energy center foundation (100 Points) Part-2
Inspection to check Concreting SRC,C(16-20) under PC(129,131,133,136 &138).
Inspection to check Anti Termite prior to casting blinding concrete under PC(129,131,133,136 &138).
Inspection to Check Level,Location & Formwork prior to concrete casting under Pile caps PC (129,131,1
Inspection to Check Formation Level prior to casting blinding concrete under strip footings between ax
Inspection of coordinate prior to probing works at zone-G, Energy center-2 (87 Points)
Inspection of coordinate prior to probing works at Zone-G, Energy center-2 (100 Points)
Inspection of Level fro Top of Backfilling for SOG at Site Tower 3.
Application of Anti Termite prior to Cast Blinding for SOG at Site Tower 3.
Concrete Pouring of Blinding under SOG C (16/20) at Site Tower 3.
Inspection to check Concreting SRC,C(16-20) for shear key of retaining wall from axis AO to AV.
Inspection to check Anti Termite prior to casting blinding concrete for shear key of retaining wall from a
Inspection to Check Level,Location & Formwork prior to casting blinding concrete under retaining wall f
Inspection to Check Excavation for Shear key in retaining wall from axis AO to AV.
Coordinates for Wall and Top Level of Kicker for Ticketing Booth 5.
Concrete Pouring for Kicker at Ticket Booth 5.
Subgrade Backfilling under Stone Boulders no. 259,260,262,263,264.
Installation of Shuttering for Kicker of Ticketing Booth 5 (H=100mm).
Surface preparation prior to start waterproofing of Boundary Wall - Inner Face, Span 81 to 89.
Inspection of coordinate prior to probing works at zone-G,Energy center-2 (99 Points)
First Coat for Damp Proof Coating of Boundary Wall - Inner Face, Span 78.
Notification for Demolition for of Existing Ticketing Booth 7.
Installation of drainage pipe (cast iron & upvc) size: 110, 75,50mm dia. as per high lighted in the dwg.
Inspection to check Concreting SRC, C(16-20)under pile caps PC (108,110) second layer & (122,124,128,
Inspection to check Anti Termite prior to casting blinding concrete under pile caps PC (108,110) second
Inspection to Check Level,Location & Formwork prior to concrete casting under Pile caps PC (108,110)
Inspection to Check initial excavation for MCPE as per attached drawing, excavation has done as per th
Installation of GEWI Bars and grouting works for 6 Mini Piles at Zone-2C (722,723,724,725,726 & 727)
Drilling works for 6 Mini Piles at Zone-2C (722,723,724,725,726 & 727).
Installation of GEWI Bars and Grouting works for 12 Mini Piles at Zone-2B (706,707,708,709,728,729
Drilling works for 12 Mini Piles at Zone-2B (706,707,708,709,728,729,730,731,768,769,770 & 771).
Installation of earthing clamps with conductor 70mm² for earthing reinforcement steel re-bar at Tic
Investigation for NGL prior to start Backfilling under Stone Rock Boulders no. 262,263,264 at Zone-5
Probing & Grouting works at Zone-G, Energy Center-2 Foundation (89 Points).
Inspection of coordinate prior to probong works at Zone-G, Energy Center-2 (89 Points).
Concrete Pouring for Dome of Ticketing Booth 1 C (32/40 Very Severe Exposed).
Concrete Pouring for existing Footing for Ticket Booth 5.
Installation of GEWI Bars and Grouting works for 3 Mini Piles at Zone-1A (79, 167 & 170).
Installation of GEWI Bars and Grouting works for 2 Mini Piles at Zone-1B (430 & 433).
Drilling works for 2 Mini Piles at Zone-1B (430 & 433).
Installation of GEWI Bars and Grouting works for 4 Mini Piles at Zone-1C (458,461,464 & 467).
Drilling works for 4 Mini Piles at Zone-1C (458,461,464 & 467).
Probing & Grouting works at Zone-G, Energy Center-2 Foundation (48 Points).
Core opening for Tower 1 - SCR no. KAIG3-SCR-TT-G-0053-00.
Inspection of coordinates prior to drilling works for 16 mini piles at zone-2B(706,707,708,709,728,
Inspection of coordinates prior to drilling works for 24 mini piles at zone-2C,(702,703,704,705,72
Probing & Grouting works at zone-G, Energy center-2 Foundation (69 Points)
Inspection of Steel and Shuttering of Dome Ticketing Booth 1.
Notification to remove eight (8) Electrical Manholes done by 2nd stage contractor, which are in the p
Inspection for Alignment of Wall for Ticket Booth 4.
Concreting of Wall for Ticket Booth 4.
Inspection of coordinate prior to probing works at zone-G, Energy Centre-2 (48 Points)
Inspection to check Concreting SRC, C(16-20) under pile caps PC(28,29 & 30 ).
Inspection to check Anti Termite prior to casting blinding concrete under pile caps PC(28,29 & 30 ).
Inspection to Check Level,Location & Formwork prior to concrete casting under Pile caps PC (28,29 & 30)
Installation of GEWI Bars and grouting for 16 mini piles at zone-1C (457,459,460,462,463,465,466,4
Drilling works for 16 mini piles at zone-1C (457,459,460,462,463,465,466,468,469,470,470,472,477,
Probing & Grouting works at zone-G,Energy center-2 Foundation (91 Points)
Primer for Damp Proof Coating of Boundary Wall - Inner Face, span 78.
Concrete Pouring of Concrete and checking of level for Slab on Grade; Toilet 5 as per attached drawi
Inspection to check Concreting SRC, C(16-20)under shear keys in PC(148,150,162 & 164 ).
Inspection to check Anti Termite prior to casting blinding concrete under shear keys PC(148,150,162 & 1
Inspection to check Concreting SRC, C(16-20) under pile caps PC(19,20,21 & 22 ).
Inspection to check Anti Termite prior to casting blinding concrete under pile caps PC(19,20,21 & 22 ).
Inspection to Check initial excavation for MCPE as per attached drawin, excavation has done as per the
Inspection to Check Level,Location & Formwork prior to concrete casting under Pile caps PC (19,20,21 &
Inspection to Check Level,Location & Formwork prior to concrete casting under Shear keys in PC (148,1
Inspection to Check Formation Level prior to casting blinding under pile caps PC (144,146,148,150,152,
Inspection of coordinate prior to probing works at zone-G, Energy center Foundation (69 Points)
Inspection of Metal Grooves Installation for External Plastering as highlighted in attached drawing; Pub
Inspection of coordinate prior to probing works at zone-G, Energy Foundation (91 Points)
Installation of GEWI Bars and grouting for 16 mini piles at zone-1B (429,431,432,434,441,442,443,4
Inspection of Setting out of Groove for Tower 1 Exterior Elevation.
Inspection of Spatter Dash (Rough Coat) and Setting out of Plaster (Guideline) for Tower 1 - as shown
Drilling works for 16 mini piles at zone-1B (429,431,432,434,441,442,443,444,449,450,451,452,453,
Probing & Grouting works at zone-G,Butterfly Garden Foundation(19 Points)
Inspection of coordinate prior to probing works at zone-G, Butterfly Garden Foundation (19 Points)
Notification for Demolition of Ticketing Booth 6.
Investigation for NGL prior to start backfilling under stone rock boulders no. 267,266 at zone 5B (se
Core Opening at electrical area service for Toilet 5.
Core Opening at electrical area service for Toilet 4.
Inspection of coordinate prior to drilling works for 20 mini piles at zone -1C(457,458,459,460,461
Inspection of coordinate prior to drilling works for 18 mini piles at zone -1B (429,430,431,432,433
Installation of GEWI Bars and grouting for 18 mini piles at zone-1A(165,166,168,169,171,172,173,1
Inspection to check Concreting SRC, C(16-20) under pile caps PC(108 & 110).
Inspection to check Anti Termite prior to casting blinding concrete under pile caps PC(108 & 110).
Inspection to check Concreting SRC, C(16-20) under shear key PC(122,124,128,132,136,138,140 & 142).
Inspection to check Anti Termite prior to casting blinding concrete under shear key PC(122,124,128,13
Inspection to Check Level,Location & Formwork prior to concrete casting under pile caps PC (108 &110).
Inspection to Check Formation Level prior to casting blinding under pile caps PC (122,124,128,132,136,1
Inspection to Check Level,Location & Formwork prior to concrete casting under shear keys in PC (122,
Installation of drainage pipe (cast iron & upvc) size: 110, 75,50mm dia. as per high lighted in the dwg.
Inspection to check Concreting SRC, C(16-20) under pile caps PC(112,114,116,118 & 120).
Inspection to check Anti Termite prior to casting blinding concrete under pile caps PC(112,114,116,118
Inspection to Check Level,Location & Formwork prior to concrete casting under pile caps PC (112,114,11
Sand Bedding layer for Rock and Boulders in zone 1 (as per attached DWG sketch).
Sand Bedding layer for Rock and Boulders in zone 1 (as per attached DWG sketch).
Investigation of Rock surface level, under rock booulders prior to backfilling subgrade at zone 1 (as
Core opening at electrical area service for Toilet 1.
Core opening at electrical area service for Toilet 2.
Core opening at electical area service for Toilet 3.
Investigation of rock surface level, under rock boulders prior to backfilling subgrade at zone 1 (as p
Sub-Base for rocks and Boulders for the attached drawing.
Sub-Base for Rocks and Boulders for the attached drawing.
Probing & Grouting works at zone-G,Butterfly Garden Foundation (75 Points)
Drilling works for 21 mini piles at zone-1A (165,166,167,168,169,170,171,172,173,174,175,176,177
Inspection of coordinate prior to probing works at zone-G, Butterfly Garden Foundation (75 Points)
Inspection of coordinate prior to drilling works for 21 mini piles at zone-1A,(165,166,167,168,169
Inspection to check Concreting SRC, C(16-20) under pile caps PC(100,102,104 & 106).
Inspection to check Anti Termite prior to casting blinding concrete under pile caps PC(100,102,104 & 10
Inspection to Check Level,Location & Formwork prior to concrete casting under pile caps PC (100,102,10
Inspection for Coordinates and level of existing footing of Ticketing Booth 5.
Application of Anti Termite at ramp area before blinding at Toilet 1.
Installation of drainage pipe (cast iron & upvc) size: 110, 75,50mm dia. as per high lighted in the dwg.
Probing & Grouting works at zone-G, Butterfly Garden Fpundation (58 Points)
Inspection of coordinate prior to probing works at zone-G, Butterfly Garden Foundation (58 Points)
Inspection of coordinate prior to probing works at zone-G, butterfly Garden Foundation (74 Points)
Notification to start excavation for culvert and open channel in zone 2B.
Filling of Tie Rod holes using HS extra for eternal elevation at Toilet 5.
Steel Reinforcement for Stiffener and Lintel Beam of Toilet 2, Ground Floor.
Inspection for Reinforcement Steel Bars for Dome of Ticketing Booth 1.
Inspection to check Concreting SRC, C(16-20) under pile caps PC(127,103,101 & 99).
Inspection to check Anti Termite prior to casting blinding concrete under pile caps PC(127,103,101 & 99)
Inspection to check Concreting SRC, C(16-20) for shear keys PC(100,102,104,106,112,114,116,118 & 120
Inspection to check Anti Termite prior to casting shear key blinding concrete in PC(100,102,104,106,11
Inspection to Check Level,Location & Formwork prior to casting shear key concrete in PC (100,102,104,
Inspection to Check Level,Location & Formwork prior to casting concrete under pile cap PC (127,103,101
Inspection to Check Formation Level prior to casting blinding under pile caps PC (100,102,104,106,108,
Installation of PVC Conduit & Boxes for Airconditioning Unit at Ticket Booth #3 Roof Level (DOME) Ar
Installation of PVC Conduit & Boxes for Airconditioning Unit at Ticket Booth #1 Roof Level (DOME) Ar
Ispection for Level of Dome Shutters for ticket Booth 1.
Inspection of rough coat before plastering using weber premix SRC 2 at external elevation (see highli
Probing & Grouting works at zone-G,Butterfly Garden Foundation (92 Points)
Inspection of coordinate prior to probing works at zone-G, Butterfly Garden Foundation (37 Points)
Inspection of coordinate prior to probing works at zone-G, Butterfly Garden Foundation (92 Points)
Inspection of reinforcement for Roof Slab as per attached drawing for Ticket Booth 3.
Pouring of Blinding concrete (16/20) for ramp area at Toilet 1
Inspection to Check Level,Location & Formwork prior to casting blinding concrete under shear key at PC
Inspection to Check Level,Location & Formwork prior to casting concrete under pile cap PC (121,117,11
Visual inspection of PVC conduit & box for Fire Alarm System at Ticket Booth #3 as per highlighted dr
Inspection to check Concreting SRC, C(16-20) under pile caps PC(105,107,109,111,117 & 121).
Inspection to check Anti Termite prior to casting concrete under pile caps PC(105,107,109,111,117 & 12
Inspection to check Concreting SRC, C(16-20) under pile caps PC(19,20,21,22,27,28,29 & 30 ).
Inspection to check Anti Termite prior to casting concrete under pile caps PC(19,20,21,22,27,28,29 & 30
Surface preparation on Concrete Boundary Wall Inner face (except column), prior to install Riyadh St
Inspection to check Concreting SRC, C(16-20)under pile caps PC(13,14,16 & 18 ).
Inspection to check Anti Termite prior to casting concrete under pile caps PC(13,14,16 & 18 ).
Inspection to Check Level , Location & Formwork prior to casting blinding under pile cap PC (13,14,16 &1
Inspection for reinforcement steel bars prior closing of shutters for ticket booth #4
Drilling works for 6 mini piles at zone-2G (290,291,292,293,294 & 295)
Installation of GEWI Bars and grouting for 6 mini piles at zone-2G (290,291,292,293,294 & 295)
Installation of GEWI Bars and grouting for 4 mini piles at zone-1B ,(445,446,447 & 448)
Drilling works for 4 mini piles at zone-1B (445,446,447 & 448)
Inspection of coordinate prior to drilling works for 4 nini piles at zone -1B (445,446,447,& 448)
Inspection of coordinate prior to drilling works for 6 mini piles at Zone-2G (290,291,292,293,294 & 2
Probing & Grouting works at Zone-G, Maze Garden Foundation (46 Points)
Inspection of coordinate prior to probing works at zone-G, Maze Garden Foundation (46 Points)
INSPECTION OF 2 PCS. RAINWATER PIPES SLEEVE (UPVC CLASS 4) 110mm dia. AND 1 PC. SLEEVE PI
Highlighted attached drawing showing cosmetics repair area at Toilet 5 prior applying repair at all el
Concrete Pouring for Roof Slab of Ticketing Booth 3; Mix Design - 32/40 (Very Severe Exposed).
Surface preparation, cleaning and removing of Tierod pipe and steel prior to start cosmetic repair at T
Rock and Stone Boulder placement no. 3; done by 2nd stage contractor.
Inspection to Check Formation Level prior to casting blinding under pile cap PC (19,20,21,22,23,24,25,26
Inspection to check Concreting SRC, C(16-20) under pile caps PC(126,130,134,137 & 147 ).
Inspection to check Anti Termite prior to casting concrete under pile caps PC(126,130,134,137 & 147 ).
Inspection to Check Level , Location & Formwork prior to casting blinding under pile cap PC (126,130,1
Laying of CMU (6 layers) for Internal Wall under lintel beam level of Toilet 2, Ground Floor.
Installation of PVC Conduit & Box for Data System at Ticket Booth # 4 Ground Level Area as per atta
Installation of 75mm PVC Conduit & Junction Box for Low Current System at Ticket Booth#4 Ground L
Installation PVC Conduit & Box for Security System at Ticket Booth #4 Ground Level Area as per atta
Probing & Grouting works at zone-G, Maze Garden Foundation (64 Points)
Installation of PVC Conduit & Switch Box for Fire Alarm System at Ticket Booth # 4 Ground Level Are
Probing & Grouting works at zone-G,Maze Garden Foundation (90 Points)
Inspection of coordinate prior to probing works at zone-G, Maze Garden Foundation (64 Points)
Inspection of cocrdinate prior to probing works aat zone-G, Maze Garden Foundation (90 Points)
Installation of earthing clamps with conductor 70mm² for earthing reinforcement steel re-bar at Tic
Installation of PVC Conduit & Boxes for Power System at Ticket Booth #4 Ground Floor Level Area as
Investigation of rock surface level, under rock boulders prior to backfilling subgrade at zone 1 (as pe
Investigation of rock surface level, under rock boulders prior to backfilling subgrade at zone 1 (as pe
Concreting of SOG for Tower 2.
Inspection for window and door opening for Ticket Booth 4.
Sub-Base for Rocks and Boulders for the attached drawing.
Sub-Base for Rocks and Boulders for the attahced drawing.
Inspection to check Concreting SRC, C(16-20) under pile caps PC(9,10,11 & 12).
Inspection to check Anti Termite prior to casting concrete under pile caps PC(9,10,11 & 12).
Inspection to check Concreting SRC, C(16-20) under shear keys in PC(11,12,13,14,15,16 & 18).
Inspection to check Anti Termite prior to casting concrete under shear keys in PC(11,12,13,14,15,16 & 1
Inspection to Check Level , Location & Formwork prior to casting blinding under pile cap PC (9,10,11 & 1
Inspection to Check Level , Location & Formwork prior to casting blinding for shear key in PC (11,12,13,
Inspection to Check formation level prior to casting blinding concrete under pile caps (11,12,13,14,15,1
Setting out and Laying of CMU (1st layers) for Internal Wall per attached drawing of Toilet 5, Ground
Application of Cosmetic repair as per attached drawing for elevations at Toilet 4.
Inspection to check Concreting SRC, C(16-20) under Pile caps PC(163,159,157 & 155).
Inspection to check Anti Termite prior to casting concrete under Pile caps PC(163,159,157 & 155).
Inspection to Check Level , Location & Formwork prior to casting blinding concrete under PC (163,159,
Probing & grouting works at zone-G, Mage Garden Foundation (79 Points).
Inspection of coordinate prior to probing works at zone-G, Maze Garden Foundation (79 Points).
Inspection for Roof - Bottom slab level (880.11) prior to install reinforcement and shuttering of roof s
grouting color of stone cladding on boundary wall and boulders in all areas using (color of grout 65 -
Top level of backfilling at ramp area at Toilet 1 as per attached drawing.
Steel Reinforcement for SOG at Site Tower 2; done by 2nd stage contractor.
Top of Concrete for SOG at Site Tower 2; done by stage contractor.
Drilling works for 4 mini piles at zone-2E (636,637,638 & 639).
Installation of GEWI bars and grouting for 4 mini piles at zone-2E (636,637,638 & 639).
Probing & Grouting works at zone-G, Maze Garden Foundation (98 Points).
Inspection of coordinate prior to probing works at zone-G, Maze Garden Foundation (98 Points).
INSPECTION OF CONDENSATE DRAIN 40mm dia & WATER RAIN PIPE 75 mm dia
Probing & Grouting works at Zone-G Phisic Garden Foundation (59 points)
Inspection of coordinate prior to probing works at zone - G, Physic Garden foundation (59 points)
Concrete Pouring for Roof Slab of Ticketing Booth 3; Mix Design - 32/40 (Very Severe Expposed).
Inspection of Metal Grooves setting out Installation for External Plastering as highlighted in attached
Inspection to check Concreting SRC, C(16-20) under Dividing wall on axis - AL.
Inspection to check Anti Termite prior to casting concrete under Dividing wall on axis - AL.
Inspection to check Concreting SRC,C(16-20) for shear key in PC (99,101,103,105,107,109 & 111)
Inspection to check Anti Termite prior to casting blinding concrete for shear key in PC (99,101,103,105
Inspection to Check Level , Location & Formwork prior to casting concrete under dividing wall on axis AL
Inspection to Check Level , Location & Formwork prior to casting blinding concrete for shear key in PC
Inspection to Check fprmation level prior to casting blinding concrete under pile caps (99,101,103,105,
Installation of GEWI Bars and grouting for 8 mini piles at zone-2D (644,645,646,647,648,649,650 & 6
Drilling works for 8 mini piles at zone-2D (644,645,646,647,648,649,650 & 651))
Visual inspection of PVC conduit & box for Fire Alarm System at Ticket Booth #3 as per highlighted dr
Visual inspection of PVC conduit & boxes for Lighting System at Ticket Booth #3 as per highlighted dr
Inspection to Check fprmation level prior to casting mass/blinding concrete under foundation of the divi
Installation of drainage pipe (upvc) size: 110, 160, 250mm dia. as per high lighted in the dwg.
Surface preparation prior to start waterproofing of Boundary Wall - Inner face, Span 76-77.
Surface preparation prior to start waterproofing of Boundary Wall - Inner face, Span 78,79 & 80.
Installation of GEWI Bars and grouting for 6 mini piles at zone-2F (624,625,626,627,70 & 71)
Drilling works for 6 mini piles at zone-2F (624,625,626,627,70 & 71)
Drilling works for 4 mini piles at zone-2E(628,629,630 &631)
Installation of GEWI Bars and grouting for 4 mini piles at zone-2E (628,629,630 & 631
Concrete Pouring of Concrete and checking of level for Slab on grade; Toilet 5 as per attched drawin
Inspection of rough coat before plastering using weber premix SRC2 at external elevetion (see highlig
Steel REinforcement for Slab on Grade of Toilet 5 part 2 as per attached drawing; done by 2nd stage
Drilling works for 10 mini piles at zone-2G (616,617,618,619,656,657,658,659,668 & 69).
Installation of GEWI bars and grouting for 10 mini piles at zone-2H (616,617,618,619,656,657,658,65
Installation of GEWI bars and grouting for 10 mini piles at zone-2H (604,605,606,607,608,609,610,61
Drilling works for 10 mini piles at zone-2H (604,605,606,607,608,609,610,611,666 & 667).
Inspection of coordinate prior to probing works at zone-G, Physic Garden Foundation (49 points).
Probing & grouting works at zone-G, Physic garden Foundation (49 Points).
Inspection of level, location and formwork prior to casting under PC (179,175,173,171,169 & 167).
Inspection for casting concrete C(15-20) under pile caps (125,123,119,115 & 113).
Inspection for Anti Termite prior to casting concrete under pile caps (125,123,119,115 & 113).
Inspection of Anti Termite prior to casting concrete under pile caps (179,175,173,171,169 & 167).
Inspection for casting concrete SRC c(15-20) under pile caps (179,175,173,171,169 & 167).
Formation Level of Backfilling (875.93) prior to cast Blinding concrete for Tower 2.
Application of Anti-Termite prior to cast Blinding for SOG at Site Tower 2 done by 2nd Stage contract
Concrete Pouring and checking of level for Slab on Grade of Toilet 5; Mix Design C32/40 OPC - (Very
Installation of drainage pipe (cast iron & upvc) size: 110, 75,50mm dia. as per high lighted in the dwg.
Steel Reinfocement for Slab on grade of Toilet 5; done by 2nd Stage contractor.
Installation of earthing clamps with conductor 70mm (4 pcs.) at the Site Tower no.2 Zone 4D as per
Inspection of Concrete casting SRC, C(16-20) under shear key PC (126,130 & 134).
Inspection of AntI termite prior to concrete casting for shear key PC (126,130 & 134).
Inspection for Location, level and formwork prior to casting blinding concrete for shear key in PC (126,
Inspection to check formation level prior to concrete casting under PC (126,130 & 134 Crescent- 2 zone
Inspection for Location, level and formwork prior to casting concrete under pile caps PC (113,115,119,1
Inspection of Metal Grooves Installation for Esternal Plastering as highlighted in attached drawing, Pub
Inspection for Roof - Bottom Slab Level (880.11) prior to install reinforcement and Shuttering of Roof
Probing & Grouting works at zone-G, Physic Garden (87 Probes)
Inspection of coordinate prior to probing works at zone G Physic Garden (87 Probes).
Laying of CMU (6 layers) for Internal Wall of Toilet 2 Ground Floor.
Filling of Tie Rod holes using HS extra for external elevation at toilet 4.
Installation of earthing clamps with conductor 70mm (4 pcs.) at the Site Tower no.5 Zone 5C as per
Installation of earthing clamps with conductor 70mm (4 pcs.) at the Site Tower no.3 Zone 1A as per
Installation of earthing clamps with conductor 70mm (4 pcs.) at the Site Tower no.1 Zone 2B as per a
Installation of earthing clamps with conductor 70mm (4 pcs.) at the Public Toilet no.5 Zone 1D as per
Installation of earthing clamps with conductor 70mm (4 pcs.) at the Public Toilet no.4 Zone 1B as per
Installation of earthing clamps with conductor 70mm (4 pcs.) at the Public Toilet no.3 Zone 5B as per
Installation of earthing clamps with conductor 70mm (4 pcs.) at the Public Toilet no.2 Zone 4D as per
Installation of earthing clamps with conductor 70mm (4 pcs.) at the Public Toilet no.1 Zone 4A as per
Inspection to check formation level prior to concrete casting under PC 28 & 30.
Inspection of Concrete casting SRC, C(16-20) under Pile caps (141,139 & 135).
Inspection of AntI termite prior to concrete casting under Pile caps (141,139 & 135).
Inspection for Location, level and formwork prior to casting blinding concrete under pile caps PC (141,
Inspection of coordinates prior to drilling works for 8 mini piles at Zone-2D (644,645,646,647,648,64
Inspection of coordinate prior to drilling works for mini piles at zone-2E (636,637,638 & 639).
Inspection of Anti Termite prior to Casting under Pile Caps PC (151,149,145 & 143).
Inspection of Coordinate prior to drilling works for 6 mini piles at Zone-2F (624,625,626,627,70 & 71)
Steel Reinforcement for Stiffener and Lintel Beam of Toilet 1, Ground Floor.
Inspection of concreting for Lintel Beams & Stiffener of doors @ Ground Floor - Tower 1.
Concrete Pouring for Kicker at Ticketing Booth 4.
Concrete Pouring of Blinding Concrete for Slab on Grade; Toilet 5 as per attached drawing; Mix Design
Application of Anti-Termite prior to cast Blinding Concrete for Slab on Grade, Toilet-5; as per attache
Installation of drainage pipe (cast iron & upvc) size: 110, 75,50mm dia. as per high lighted in the dwg.
Core Opening at electrical area service for Toilet 5.
Core opening at electrical area service for Toilet 4.
Core opening at electrical area service for Toilet 3.
Core opening at electrical servise for Toilet 2.
Core Opening at electrical area service for Toilet 1.
Installation of Shuttering for Kicker of Ticketing Booth 4 (H=100mm).
Installation of direct buried PVC conduit (6 inch. 4pcs. LV -cables Switchboard, 6inch. 1pc.-Sub-main
Installation of direct buried PVC conduit (4 inch. 2pcs.- Incoming fire & security, 6inch.- 2pcs. ICT ca
Inspection of shuttering and rebars for lintel beams & stiffener of doors @ Ground Floor - Tower 1.
Inspection for existing level on top of foundation for Ticketing Booth 4.
Coordinate points for Ticketing Booth 4 Layout.
Application of Anti-Termite prior to concrete casting SRC, C16/20 under strip footing between axis A
Inspection of coordinates prior to drilling works for 4 mini piles at zone-2K (580,581,582 & 583).
Drilling works for 4 mini piles at zone-2K (580,581,582 & 583).
Installation of GEWI bars and grouting for 4 mini piles at zone-2K (580,581,582 & 583).
Inspection of coordinates prior to drilling works for 12 mini piles at zone-1E (81,82,83,84,505,506,5
Drilling works for 12 mini piles at zone-1E (81,82,83,84,505,506,507,508,509,510,511 & 512).
Installation of GEWI bars and grouting for 12 mini piles at zone-1E (81,82,83,84,505,506,507,508,509
Location level of formworks prior to casting concrete under pile caps (151,149,145 & 143).
Concreting SRC C16/20 under pile caps (151,149,145 & 143).
APPLICATION OF ANTI TERMITE PRIOR TO CAST BALINDING FOR SLAB ON GRADE TOILET 5
CASTING OF BLINDING CONCRETE BEFORE SLAB ON GRADE AS PER ATTACHED DWG.
Inspection of coordinates prior to drilling works for 10 mini piles at zone-2G (616,617,618,619,656,6
Inspection of coordinates prior to drilling works for 4 mini piles at zone-2E (628,629,630 &631).
Installation of GEWI bars and grouting for 4 mini piles at zone-2J (588,589,590 & 591).
Drilling works for 4 mini piles at zone-2J (588,589,590 & 591).
Installation of GEWI bars and grouting for mini piles at zone-2K (584,585,586,587,662 & 663).
Drilling works for 6 mini piles at zone-2K (584,585,586,587,662 & 663).
Inspection to check formation level prior to casting mass/blinding level from axis S-L at PC (127,125
Inspection of Concrete Casting SRC, C16/20 under strip footing between axis AS-AR.
Inspection of Concrete Casting SRC C16/20 at PC (127,125,123,121,119,117,115 & 113) Shear Key Bli
Concrete Pouring for Existing Footing - Ticketing Booth 4 Mix Design - 32/40 Screed Concrete ( Very
Concrete Pouring for Wall - Ticketing Booth 3 Mix Design - 32/40 Screed Concrete (Severe Exposure 1
Installation of Steel Reinforcement and shuttering for Existing Foundation of Ticketing Booth 4.
Notification prior to start demolition of Ticketing Booth 5.
Inspection of openings for door and window dimension & level - Ticketing Booth 3.
Steel Reinforcement for Stiffener in Tower 1.
Installation of drainage pipe (cast iron & upvc) size: 110, 75,50mm dia. as per high lighted in the dwg.
Close shuttering of wall for Ticket Booth 3 prior to concrete casting.
Inspection of coordinate prior to drilling works for 10 mini piles at zone-2H (604,605,606,607,608,6
Inspection of coordinate prior to drilling works for 4 mini piles at zone-2J ( 588,589,590 & 591).
Inspection of coordinate prior to drilling works for 6 mini piles at zone-2K.
LAYING OF CMU INTERNAL WALL OF TOILET 1 GROUND FLOOR
Filling of Tie Rod holes using HS extra for Elevation at Toilet no. 4.
Installation of GEWI bars and grouting for mini piles at Zone-2L (216,217,218 & 219).
Drilling works for 4 mini piles at Zone-2L (216,217,218 & 219).
Installation of GEWI Bars and Grouting works for 21 mini piles at Zone-2M (564,565,566,567,568,
Drilling works for 21 mini piles at zone-2M (564,565,566,567,568,569,3000,3001,3002,3003,3004,3
Highlighted drawings showing structural repairing area prior to proceed with repairing works (4.2sm)
Inspection of coordinates prior to drilling works for 21 mini piles at zone-2M (564,565,566,567,
Inspection of coordinates prior to drilling works for 4 mini piles at zone-2N (886,887,888 & 889).
Installation of GEWI bars and grouting for 4 mini piles at zone-2N (886,887,888 & 889).
Drilling works for 4 mini piles at zone-2N (886,887,888 & 889).
Inspection of coordinate prior to drilling works for 4 mini piles at zone-2L (216,217,218 & 219)
Probing & Grouting Works at Zone-B, Water Garden Boundary Wall Foundation
Inspection of Coordinates prior to Probing Works at Zone-B, Water Garden Boundary Wall Foundatio
Probing & Grouting works at Aviary garden foundation, (88 Points).
Probing & Grouting works at Aviary garden foundation, (42 Points).
Probing & Grouting works at Aviary garden foundation, (88 Points).
Probing & Grouting works at Aviary garden foundation, (62 Points).
Probing & Grouting works at Aviary garden foundation, (86 Points).
Installation of drainage pipe (cast iron & upvc) size: 110, 75,50mm dia. as per high lighted in the dwg.
Steel reinforcement for Stiffener in Tower-1.
Core cutting as per SCR (KAIG3-SCR-MB-G-0054-00) as highlighted in drawing for Management Building.
Installation of GEWI bars and grouting for 10 mini piles at zone-1G, ((113,114,115,116,121,122,123,124,
Drilling works for 10 mini piles at zone-1G, ((113,114,115,116,121,122,123,124,125 & 126 ).
Installation of GEWI bars and grouting for 8 mini piles at zone-1F, (127,128,129,130,541,542,543 & 544 )
Drilling works for 8 mini piles at zone-1F, (127,128,129,130,541,542,543 & 544 ).
Probing & Grouting works at zone B, Water garden boundary wall (68 Points).
Probing & Grouting works at zone B, Water garden boundary wall (08 Points).
Inspection of Concrete casting SRC, C(16-20) under strip footing between axis AS-AR
Inspection for Location, level and formwork prior to casting blinding concrete under strip footing betw
Inspection of Coordinates prior to start drilling works for 10 Mini Piles in Zone -1G, (113,114,115,116,
Inspection of Coordinates prior to start drilling works for 8 Mini Piles in Zone -1F, (127,128,129,130,54
Inspection for Coordinates prior to start Probing works at zone B,Water garden boundary wall (68 Point
Inspection for Coordinates prior to start Probing works at zone B,Water garden boundary wall (8 Points
Inspection of Concrete casting SRC, C(16-20) at PC (127,125,123,121,119,117,115 & 113 )
Inspection for Location, level and formwork prior to casting blinding concrete for shear key at PC (12
Inspection to check formation level prior to casting mass/blinding level from Axis S-L at PC (127,125,1
Inspection of Concrete casting SRC, C(16-20) at PC (153,161,165,166,168 & 177 )
Inspection of AntI termite prior to concrete casting under pile caps PC (153,161,165,166,168 & 177 )
Probing & Grouting works at zone B, Water garden boundary wall (44 Points).
Probing & Grouting works at zone B, Water garden boundary wall (87 Points).
Inspection for Location, level and formwork prior to casting blinding concrete under pile caps PC (153
Inspection to check formation level prior to casting mass/blinding concrete under foundation of the divi
Inspection for Coordinates prior to start Probing works at zone B,Water garden boundary wall (44 Point
Inspection for Coordinates prior to start Probing works at zone B,Water garden boundary wall (87 Point
Top level of backfilling and top of Blinding Concrete level as per attached Drawing, Toilet-5.
Highlighted drawing showing External Elevation for Cosmetic and Structural repairing area prior to pro
Setting out of Grooves for Exterior Elevation as per attached drawing prior to install all Grooves for Tow
Setting out of CMU (1st layer) for Internal Wall of Toilet-2, Ground Floor.
Application of Zinc Rich on existing Steel Reinforcement for Boundary Wall after Sandblasting, Span #33
Installation of earthing conductor for reinforcement steel re-bar at Ticket Booth #3 Ground Floor Le
Installation of PVC Conduit & Boxes for Power System at Ticket Booth #3 Ground Floor Level Area as
Installation of PVC Conduit & Box for Data System at Ticket Booth # 3 Ground Level Area as per atta
Installation of 75mm PVC Conduit & Junction Box for Low Current System at Ticket Booth#3 Ground L
Installation PVC Conduit & Box for Security System at Ticket Booth #3 Ground Level Area as per atta
Installation of PVC Conduit & Switch Box for Fire Alarm System at Ticket Booth # 3 Ground Level Are
Setting out of CMU (1st layer) for Internal Wall of Toilet-1, Ground Floor.
INSPECTION OF CONDENSATE DRAIN 40mm dia & WATER RAIN PIPE 75 mm dia
Installation of Steel Reinforcement and Shuttering for Kicker of Ticketing Booth #4, (H=100mm).
Installation of Steel Reinforcement and Shuttering for Existing Foundation of Ticketing Booth #4.
Inspection of Metal Grooves Installation for External Plastering as highlighted in attached drawing; Public
Probing & Grouting works at zone B,Water garden boundary wall (83 Points).
Inspection for Coordinates prior to start Probing works at zone- B, Aviary Garden, (88 Points).
INSPECTION OF 2 PCS. RAINWATER PIPES (UPVC CLASS 4) 75mm dia. AND 2 PCS. SLEEVE PIPES 110
Core opening for Toilet - 1, as per SCR (KAIG3-SCR-PT-G-0046-00).
Probing & Grouting works at zone B,Water garden boundary wall (73 Points).
Inspection for Coordinates prior to start Probing works at zone- B, Aviary Garden, (42 Points).
Inspection for Coordinates prior to start Probing works at zone- B, Aviary Garden, (88 Points).
Inspection of Concrete casting SRC, C(16-20) for north watch tower retaining wall to Axis AS
Inspection of AntI termite prior to concrete casting for north watch tower retaining wall to Axis AS
Inspection of Concrete casting SRC, C(16-20) at PC (143,141,139,137,135,133,131 & 129)
Inspection of AntI termite at PC (143,141,139,137,135,133,131 & 129)
Investigation of Rock surface at zone -7 and zone 5 (pile cap).
Inspection to check formation level prior to casting mass/blinding concrete level from Axis AB-T.
Inspection for Location, level and formwork prior to casting blinding concrete for shear key at PC (14
Inspection for Location, level and formwork prior to casting blinding concrete for watch tower & retaini
Inspection to check formation level prior to casting mass concrete under strip footing from Axis (AS-AQ)
Inspection for rock surface for buildings prior to start backfilling to the level under intereir footing bui
Notification prior to start Backfilling under Slab on Grade level of Ticketing Booth #2.
Installation of GEWI bars and grouting for 10 mini piles at zone-1H, (321,322,323,324,529,530,531,532
Drilling works for 14 mini piles at zone-1H, (321,322,323,324,529,530,531,532,533 & 534).
Probing & Grouting works at zone B,Water garden boundary wall (77 Points).
Installation of GEWI bars and grouting for 14 mini piles at zone-2P, (838,839,840,841,846,847,848,84
Drilling works for 14 mini piles at zone-2P, (838,839,840,841,846,847,848,849,870,871,872,873,874 &8
Installation of GEWI bars and grouting for 14 mini piles at zone-2P, (842,843,844,845,866,867,868,86
Drilling works for 14 mini piles at zone-2P, (842,843,844,845,866,867,868,869,876,877,878,879,880 & 8
Inspection of Coordinates prior to start drilling works for 10 Mini Piles in Zone -1H, (321,322,323,324,
Inspection for Coordinates prior to start Probing works at zone- B, Aviary Garden, (62 Points).
Inspection for Coordinates prior to start Probing works at zone- B, Aviary Garden, (86 Points).
Inspection of Concrete casting SRC, C(16-20) under pile caps PC (1,2,3,4,6 & 8)
Inspection of AntI termite prior to concrete casting under pile caps PC (1,2,3,4,6 & 8)
Inspection for Location, level and formwork prior to casting blinding concrete under pile caps PC (1,2,3,
Inspection of Steel Reinforcement for Walls prior to close Shuttering - Ticketing Booth #3.
Concrete Pouring for Column - Corebel Extension outer face (for Column 75 to 89, except col. 81) as
Shuttering for Column - Corebel Extension outer face (for Column 75 to 89, except col. 81) as per atta
Inspection of Concrete casting SRC, C(16-20) for shear key PC (163,161,159,157,155,153,151,149,147 &
Inspection of AntI termite prior to casting blinding concrete for shear key PC (163,161,159,157,155,15
Inspection for Location, level and formwork prior to casting blinding concrete for shear key at PC (1
Inspection to check the formation level prior to casting mass concrete/blinding level from Axis AL-AB
Inspection of Metal Grooves Installation for External Plaatering of Public Toilet - 1.
Notification to proceed with concrete testing for existing water tank as per Letter DAR-ZHG-KAIG-GEN-4
Rebar Planting for Column and Corebel Extension outer face (for Column 75 to 89, except col. 81) as p
Concrete Pouring for Roof Slab - Ticketing Booth #1; Mix Design - 32/40 Screed Concrete (Severe Expose
Top level of Roof Slab / (T.S.L.) - Ticketing Booth #1.
Installation of PVC Conduit & boxes for Lighting System at Ticket Booth #1 Roof Floor Level as per at
Installation of PVC Conduit & Box for Fire Alarm System at Ticket Booth #1 Roof Level as per attached
Installation of 7x7 inch. Box for Disabled Alarm System at Public Toilet #1 Zone 4A Ground Level Ar
Setting of CMU (sixth layer) for Internal Wall of Tower-1, Ground Floor.
Inspection of Concrete casting SRC, C(16-20) under pile caps PC (174,172 & 170)
Inspection of AntI termite prior to concrete casting under pile caps PC (174,172 & 170)
Inspection for Location, level and formwork prior to casting blinding concrete under pile caps PC (174,
Inspection for Coordinates prior to start Probing works at zone B,Water garden boundary wall (83 Point
Concrete Pouring for Post and Beam beside existing Column / Grade Beam of Management Building (
Inspection for Plastering Guide lines at Public Toilet #5.
Installation of GEWI bars and grouting for 10 mini piles at zone-1H, (99,100,101,102,103,104,105,106,1
Drilling works for 10 mini piles at zone-1H, (99,100,101,102,103,104,105,106,107 & 108).
Drilling works for 14 mini piles at zone-2Q, (810,811,812,813,822,823,824,825,826,827,828,829,830 & 8
Installation of GEWI bars and grouting for 14 mini piles at zone-2Q, (810,811,812,813,822,823,824,82
Installation of GEWI bars and grouting for 14 mini piles at zone-2Q, (814,815,816,817,818,819,820,82
Drilling works for 14 mini piles at zone-2Q, (814,815,816,817,818,819,820,821,832,833,834,835,836 &8
Inspection of Coordinates prior to start drilling works for 10 Mini Piles in Zone -1H, (99,100,101,102,1
Installation of 7x7 inch. Box for External Light at Public Toilet #1 Zone 4A Ground Level Area as per
Inspection of Concrete casting SRC, C(16-20) under pile caps PC (180,178 & 176)
Inspection of AntI termite prior to concrete casting under pile caps PC (180,178 & 176)
Inspection of Concrete casting SRC, C(16-20) for shear key PC (165,167,169,171,173,175,177 &179)
Inspection of AntI termite prior to casting blinding concrete for shear key PC (165,167,169,171,173,17
Inspection for Location, level and formwork prior to casting blinding concrete under pile caps PC (180,1
Inspection for Location, level and formwork prior to casting blinding concrete for shear key at PC (16
Inspection to check the formation level prior to casting mass concrete/blinding from Axis AS-AL
Probing and Grouting works at Zone 2K, MCPE foundation (27 Points)
Inspection for Coordinates prior to start Probing works at zone 2K, MCPE foundation, (27 Points).
Notification prior to start Demolition of Ticketing Booth #4.
Probing and Grouting works at Zone 2K, MCPE foundation (81 Points)
Inspection for Coordinates prior to start Probing works at zone 2K, MCPE foundation, (81 Points).
Inspection of Coordinates prior to start drilling works for 14 Mini Piles in Zone -2P, (838,839,840,841
Wall Coordinate and Kicker Level for Ticketing Booth #3.
Concrete pouring for Kicker at Ticketing Booth #3.
Shuttering for Post and Beam beside existing Grade Beam of Management Building (as per KAIG3-SD-
Steel Reinforcement for Roof Slab as per attached drawing for Ticketing Booth #1.
Inspection of Concrete casting SRC, C(16-20) under pile caps PC (40,38,36,34)
Inspection of AntI termite prior to concrete casting under pile caps PC (40,38,36,34)
Inspection of Concrete casting SRC, C(16-20) for shear key PC (180,178,176,174,172,170,168,166)
Inspection of AntI termite prior to casting blinding concrete for shear key PC (180,178,176,174,172,170
Inspection of 3-Sample Groove finishing as per Consultant request Toilet - 1.
Installation of Stone Cladding for Concrete Boundary Wall outer face (except column),wall span #79 & 8
Inspection for Location, level and formwork prior to casting blinding concrete under pile caps PC (40,38
Inspection for Location, level and formwork prior to casting blinding concrete for shear key at PC (18
Inspection to check the formation level prior to casting mass concrete/blinding from Axis AT-AL
Inspection for Coordinates prior to start Probing works at zone B,Water garden boundary wall (77 Point
Inspection for Coordinates prior to start Probing works at zone B,Water garden boundary wall (73 Point
Application of Damproofing Paint (Final Coat / 2nd layer) for existing foundation inside Ticketing Booth
Cosmetic repair for Exterior Elevation as highlighted area in RFI (KAIG#-RFI-PT-S-0430-00), Toilet-3.
Concrete Pouring for Post and Beam beside existing Column / Grade Beam of Management Building (as
Steel Reinforcement for Post and Beam beside existing Grade Beam of Management Building (as per
Installation of GEWI bars and grouting for 14 mini piles at zone-1J, (85,86,87,88,89,90,337,338,339,34
Drilling works for 14 mini piles at zone-1J, (85,86,87,88,89,90,337,338,339,340,513,514,515 & 516).
Conrete Pouring for Slab on Grade of Toilet 2; Mix Design C32/40 - (Very Severe Expose).
Inspection of Coordinates prior to start drilling works for 14 Mini Piles in Zone -2P, (842,843,844,845
Inspection of Coordinates prior to start drilling works for 14 Mini Piles in Zone -1J, (85,86,87,88,89,9
Inspection of Coordinates prior to start drilling works for 14 Mini Piles in Zone -2Q, (810,811,812,81
Inspection of Coordinates prior to start drilling works for 14 Mini Piles in Zone -2Q, (814,815,816,81
Probing and Grouting works at Zone 2K, MCPE foundation (77 Points)
Installation of GEWI bars and grouting for 14 mini piles at zone-1J, (333,334,335,336,341,342,343,344
Drilling works for 14 mini piles at zone-1J, (333,334,335,336,341,342,343,344,535,536,537,538,539 & 5
Inspection of Coordinates prior to start drilling works for 14 Mini Piles in Zone -1J, (333,334,335,336
Inspection for Coordinates prior to start Probing works at zone 2K, MCPE foundation, (77 Points).
Steel Reinforcement for Slab on Grade of Toilet 2.
Rock level and Existing level of Water Garden - Boundary Wall (Col. 15-21, & 27-40).
Check formation level prior to casting blinding at North watch tower and Retaining wall.
Investigation of Rock surface at zone-5 pile cap , strip footing & Retaining wall Crescent 1 from Axis
Investigation of Rock surface at zone-4 pile cap and strip footing Crescent 1 from Axis 01/P - 01/G (Out
Top level of Existing Foundation - Ticketing Booth #3.
Concrete Pouring for Existing Founddation - Ticketing Booth #3; Mix Design - 32/40 Screed Concrete (S
Probing and Grouting works at Zone 2J, MCPE foundation (93 Points)
Inspection for Coordinates prior to start Probing works at zone 2J, MCPE foundation, (93 Points).
Installation of earthing clamps with conductor 70mm² connected to reinforcement steel re-bar at Si
Application of Zinc Rich on existing Steel Reinforcement for Boundary Wall after Sandblasting, Span 38
Top level of backfill prior to cast Blinding Concrete for Slab on Grade (as per highlighted in attached
Probing and Grouting works at Zone 2J, MCPE foundation (86 Points)
Inspection for Coordinates prior to start Probing works at zone 2J, MCPE foundation, (86 Points).
Inspection of Concrete casting SRC, C(16-20) under pile caps PC (33,35,37,39,42 & 44)
Inspection of AntI termite prior to concrete casting under pile caps PC (33,35,37,39,42 & 44)
Inspection for Location, level and formwork prior to casting blinding concrete under pile caps PC (33,3
Installation of Stone Cladding for Concrete Boundary Wall outer face (except column),wall span #83 - 85
Surface preparation on Concrete Boundary Wall outer face (except column), prior to install Riyadh Ston
Application of Zinc Rich on existing Steel Reinforcement for Boundary Wall after Sandblasting, Span #3
Sandblasting of existing Steel Reinforcement for Boundary Wall, Span #33 & 34. Done by 2nd Stage Cont
As-built Existing Level of Physic Garden
Installation of GEWI bars and grouting for 14 mini piles at zone-1L, (373,374,375,376,377,378,389,390
Drilling works for 14 mini piles at zone-1L, (373,374,375,376,377,378,389,390,391,392,393,394,395 & 3
Installation of GEWI bars and grouting for 14 mini piles at zone-1K, (351,352,353,354,355,356,361,36
Drilling works for 14 mini piles at zone-1K, (351,352,353,354,355,356,361,362,363,364,365,366,367 & 3
Inspection of Coordinates prior to start drilling works for 14 Mini Piles in Zone -1L, (373,374,375,376
Inspection of Coordinates prior to start drilling works for 14 Mini Piles in Zone -1K, (351,352,353,354
Probing and Grouting works at Zone 2J, MCPE foundation (23 Points)
Inspection for Coordinates prior to start Probing works at zone 2J, MCPE foundation, (23 Points).
Inspection of Concrete casting SRC, C(16-20) for shear key PC (44,42,40,38,36,34 & 32)
Inspection of AntI termite prior to casting blinding concrete for shear key PC (44,42,40,38,36,34 & 32)
Inspection to check formation level prior to casting of blinding / Mass concrete under pile cap at Axis
Inspection to check formation level prior to casting of blinding concrete for PC & Strip footing at Axis 0
Inspection for Location, level and formwork prior to casting blinding concrete for shear key PC (44,42,4
Installation of GEWI bars and grouting for 14 mini piles at zone-1K, (345,346,347,348,349,350,357,358
Drilling works for 14 mini piles at zone-1K, (345,346,347,348,349,350,357,358,359,360,369,370,371 & 3
Inspection of Coordinates prior to start drilling works for 14 Mini Piles in Zone -1K, (345,346,347,348
Application of Damproofing Paint for existing foundation inside Ticketing Booth #2.
Concrete Pouring for Slab on Grade Toilet-1; Mix Design C32/40 - (Severe Exposed). Done by 2nd Stage
Rock level and Existing level of Water Garden - Boundary Wall (Col. 41 - 49).
Probing and Grouting works at Zone 2H, MCPE foundation (58 Points)
Inspection for Coordinates prior to start Probing works at zone 2H, MCPE foundation, (58 Points).
Shuttering and Steel Reinforcement for Kicker Bars - Ticketing Booth #3.
Steel Reinforcement for Slab on Grade of Toilet-1; Done by 2nd Stage Contractor.
Installation of GEWI bars and grouting for 14 mini piles at zone-1M, (401,402,403,404,405,406,417,418
Drilling works for 14 mini piles at zone-1M, (401,402,403,404,405,406,417,418,419,420,421,422,423 & 4
Inspection of Coordinates prior to start drilling works for 14 Mini Piles in Zone -1M, (401,402,403,40
Inspection of Concrete casting SRC, C(16-20) for shear key at PC (31,33,35,37 & 39 )
Inspection of AntI termite prior to concrete casting for shear key at PC (31,33,35,37 & 39 )
Inspection of Concrete casting SRC, C(16-20) under pile caps PC (1,2,3,4,6 & 8 )
Inspection of AntI termite prior to concrete casting under pile caps PC (1,2,3,4,6 &8 )
Inspection of Concrete casting SRC, C(16-20) under pile caps PC (46,48,50 &52) and pile cap second laye
Inspection of AntI termite prior to concrete casting under pile caps PC (46,48,50 &52)
Inspection for Location, level and formwork prior to casting blinding concrete under shear key PC (31,3
Inspection for Location, level and formwork prior to casting blinding concrete under Pile Caps (1,2,3,4,6
Inspection for Location, level and formwork prior to casting blinding concrete under pile caps PC (46,4
Application of Primer Coat on Boundary Wall for Waterproofing; Span 42 & 45. Done by 2nd Stage Contr
Inspection for Wall Coordinates of Ticketing Booth #3.
Top level of backfill prior to cast Blinding Concrete for Slab on Grade of Management Buiding; done by
Concrete Pouring of Blinding Concrete for Slab on Grade; Toilet-2; . Mix Design- C 16/20 (SRC). Done by
Application of Anti-Termite prior to cast Blinding Concrete for Slab on Grade , Toilet-2. Done by 2nd Sta
Concrete Pouring for Slab on Grade - Entrance Area of Tower-1; Mix Design C32/40 - (Severe Exposed).
Steel Reinforcement for Slab on Grade - Entrance Area of Tower-1; Done by 2nd Stage Contractor.
Investigation for Rock surface for PC-at crescent -2 zone 4 Axis 02/AB-02/AL Outer line and crescent 1 zo
Inspection of Concrete casting SRC, C(16-20) under Pile cap shear key PC (46,48,50 & 52)
Inspection of AntI termite prior to casting concrete under Pile cap shear key PC (46,48,50 & 52)
Inspection for Location, level and formwork prior to casting blinding concrete for shear key at PC (46,48
Concrete Pouring forWall - Ticketing Booth #1. Mix Design - 32/40 Screed Concrete (Severe Exposed to
Rock level and Existing level of Water Garden - Boundary Wall (Col. 3 - 10).
Inspection of Concrete casting SRC, C(16-20) under PC (53,51,49,47,45,43,41).PC (186 Second layer)&PC (
Inspection of Anti termite prior to Concrete casting under PC (53,51,49,47,45,43,41).PC (186 Second laye
Inspection for Location, level and formwork prior to casting blinding concrete under pile caps PC (53,5
Shuttering for Post and Beam beside existing Grade Beam of Management Building (as per KAIG3-SD-
Installation of earthing conductor for earthing reinforcement steel re-bar at Ticket Booth #1 Ground
Concrete Pouring for Post and Beam beside existing Column / Grade Beam of Management Building (a
Steel Reinforcement for Post and Beam beside existing Grade Beam of Management Building (as per
Solid Block wall beside Grade Beam of Management Building (as per KAIG3-SD-MB-A-BW-1014-00); don
Concrete Pouring of Blinding Concrete for Slab on Grade ; Toilet-1; . Mix Design- C 16/20 (SRC)
Application of Anti-Termite prior to cast Blinding Concrete for Slab on Grade - Toilet-1.
Probing and Grouting works at Zone 2H, MCPE foundation (37 Points)
Installation of GEWI bars and grouting for 12 mini piles at zone-2B, (732,733,734,735,736,737,762,763
Drilling works for 12 mini piles at zone-2B, (732,733,734,735,736,737,762,763,764,765,766, & 767).
Installation of GEWI bars and grouting for 14 mini piles at zone-2A, (750,751,752,753,754,755,756,757
Drilling works for 14 mini piles at zone-2A, (750,751,752,753,754,755,756,757,758,759,760,761,76 & 77
Installation of GEWI bars and grouting for 12 mini piles at zone-2A, (738,739,740,741,742,743,744,745
Drilling works for 12 mini piles at zone-2A, (738,739,740,741,742,743,744,745,746,747,748 & 749).
Inspection for Coordinates prior to start Probing works at zone 2H, MCPE foundation, (37 Points).
Inspection of Coordinates prior to start drilling works for 12 Mini Piles in Zone -2B, (732,733,734,735
Inspection of Coordinates prior to start drilling works for 14 Mini Piles in Zone -2A, (750,751,752,753
Inspection of Coordinates prior to start drilling works for 12 Mini Piles in Zone -2A, (738,739,740,741
Inspection of second layer Concrete casting SRC, C(16-20) under pile caps PC (54,56,58 & 60)
Inspection for Location, level and formwork prior to casting blinding concrete under pile caps PC (54,5
Probing and Grouting works at Zone 2H, MCPE foundation (78 Points)
Inspection for Coordinates prior to start Probing works at zone 2H, MCPE foundation, (78 Points).
Installation of PVC Conduit & Box for Power System at Ticket Booth # 1 Ground Floor Level Area as p
Installation of PVC Conduit & Box for Data System at Ticket Booth # 1 Ground Level Area as per atta
Installation of 75mm PVC Conduit & Junction Box for Low Current System at Ticket Booth#1 Ground L
Installation PVC Conduit & Box for Security System at Ticket Booth #1 Ground Level Area as per atta
Installation of PVC Conduit & Switch Box for Fire Alarm System at Ticket Booth # 1 Ground Level Are
Alignment of Shuttering for Walls of Ticketing Booth #1, prior to concrete pouring.
Concrete Pouring of Blinding Concrete for Slab on Grade - Entrance Area; Tower-1; . Mix Design- C 16/2
Application of Anti-Termite prior to cast Blind Concrete for Slab on Grade - Entrance Area, Tower-1.
Application of Zinc Rich on existing Steel Reinforcement for Boundary Wall after Sandblasting, Span 38
Probing and Grouting works at Zone 2G, MCPE foundation (77 Points)
Inspection for Coordinates prior to start Probing works at zone 2G, MCPE foundation, (77 Points).
Inspection of Concrete casting SRC, C(16-20) at PC (62 & 64)
Inspection of AntI termite prior to concrete casting under pile caps PC (62 & 64)
Inspection for Location, level and formwork prior to casting blinding concrete under pile caps PC (62,64)
Inspection to check formation level prior to casting blinding / Mass concrete under pile cap Axis 01/AA
Concrete Pouring for Post and Beam beside existing Column / Grade Beam of Management Building (a
Installation of GEWI bars and grouting for 14 mini piles at zone-2R, (74,75,794,795,796,797,913,914,9
Drilling works for 14 mini piles at zone-2R, (74,75,794,795,796,797,913,914,915,916,921,922,923 & 789
Installation of GEWI bars and groutg for 12 mini piles at zone-2R, (790,791,792,793,909,910,911,912,9
Installation of GEWI bars and groutg for 12 mini piles at zone-2R, (798,799,800,801,806,807,802,803,8
Drilling works for 12 mini piles at zone-2R, (798,799,800,801,806,807,802,803,804,805,808 & 809).
Drilling works for 12 mini piles at zone-2R, (790,791,792,793,909,910,911,912,917,918,919 &920).
Steel Reinforcement for Post and Beam beside existing Grade Beam of Management Building (as per
Solid Block wall beside Grade Beam of Management Building (as per KAIG3-SD-MB-A-BW-1014-00); don
Shuttering for Post and Beam beside existing Grade Beam of Management Building (as per KAIG3-SD-
Filling of Tie-rod holes by using HS Extra for External Elevation, Toilet - 3. Done by 2nd Stage Contractor.
Sandblasting of existing Steel Reinforcement for Boundary Wall, Span #35-37. Done by 2nd Stage Contra
Inspection of first layer Concrete casting SRC, C(16-20) under pile caps PC (54,56,58 & 60)
Inspection of AntI termite prior to first layer concrete casting at PC (54,56,58 & 60)
Inspection for Location, level and formwork prior to casting blinding concrete under pile caps PC (54,56,5
Inspection of Coordinates prior to start drilling works for 18 Mini Piles in Zone -2R, (790,791,792,7
Inspection of Coordinates prior to start drilling works for 20 Mini Piles in Zone -2R, (74,75,794,795
Inspection for Plastering Guide lines at Site Tower #2; done by 2nd Stage Contractor.
Highlighted drawing for Closing Drainage Pipe at Toilet #1.
Surface preparation of existing foundation inside Ticketing Booth #2 prior to apply Bitumen.
Investigation of Rock surface at zone-1 Retaining wall as per attachment.(From AO-North tower)
Inspection of Concrete casting SRC, C(16-20) at PC (41,43,45,47,49,51,62,64)
Inspection of AntI termite prior to casting concrete at PC (41,43,45,47,49,51,62,64)
Inspection for Location, level and formwork prior to casting blinding concrete for shear key at PC (41,
Inspection of Openings for Door and Window dimension & level - Ticketing Booth #1.
Rock and Stone Boulder Placement No.3, done by 2nd Stage Contractor.
Drilling works for 14 mini piles at zone-1M, (407,408,409,410,411,412,413,414,415,416,425,426,427 &4
Installation of GEWI bars and groutg for 14 mini piles at zone-1L, (379,380,381,382,383,384,385,386,
Installation of GEWI bars and grouting for 14 mini piles at zone-1M, (407,408,409,410,411,412,413,41
Drilling works for 14 mini piles at zone-1L, (379,380,381,382,383,384,385,386,387,388,397,398,399 &40
Inspection of Concrete casting SRC, C(16-20) under Pile caps PC (66,68 & 70)
Inspection of AntI termite prior to casting concrete under Pile cap PC (66,68 & 70)
Inspection for Location, level and formwork prior to casting blinding concrete under pile caps PC (66,68
Inspection of Coordinates prior to start drilling works for 14 Mini Piles in Zone -1L, (379,380,381,38
Inspection of Coordinates prior to start drilling works for 14 Mini Piles in Zone -1M, (407,408,409,41
Mock-up for Grouting Color of Stone Cladding on Boundary Wall (Color of Grout #65 - from Vetonite), S
Installation of Stone Cladding for Concrete Boundary Wall outer face (except column),wall span #83 - 85
Installation of Stone Cladding for Concrete Boundary Wall outer face (except column),wall span #81 & 8
INPECTION OF CONDENSATE DRAIN 40mm DIA AND WATER RAIN PIPE 75mm DIA.
Inspection of Metal Grooves Installation for External Plaatering of Public Toilet - 1; done by 2nd Stage C
Inspection for Plastering Guide for Public Toilet - 4; done by 2nd Stage Contractor.
Rock level and Existing level of Water Garden - Boundary Wall (Col. 15-21, & 27-40).
Surface preparation prior to start waterproofing of Boundary Wall - inner face , Span 46-48.
Coordinates and Level for Wall - Centerline of Physic Garden
Setting of CMU (first layer) for Internal Wall of Tower-1, Ground Floor.
Installation of GEWI bars and grouting for 14 mini piles at zone-1N, (11,12,13,14,15,16,17,18,19,20,29,
Drilling works for 14 mini piles at zone-1N, (11,12,13,14,15,16,17,18,19,20,29,30,31,32)
Installation of GEWI bars and grouting for 14 mini piles at zone-1N, (5,6,7,8,9,10,21,22,23,24,25,26,27 &
Surface Preparation on Blinding for Boundary Wall, prior to start application of Bitumen, Span #19-21.
Drilling works for 14 mini piles at zone-1N, (5,6,7,8,9,10,21,22,23,24,25,26,27 & 28)
Inspection of Concrete casting SRC, C(16-20) under Pile caps PC (72,74 & 76)
Inspection of AntI termite prior to casting concrete under Pile cap PC (72,74 & 76)
Inspection for Location, level and formwork prior to casting blinding concrete under pile caps PC (72,74
Inspection of Coordinates prior to start drilling works for 14 Mini Piles in Zone -1N (11,12,13,14,15,16,
Inspection of Coordinates prior to start drilling works for 14 Mini Piles in Zone -1N (5,6,7,8,9,10,21,22,
Inspection of Steel Reinforcement for Walls prior to close Shuttering - Ticketing Booth #1.
Highlighted drawing showing External Elevation Cosmetic Repair area prior to proceed with repairing wo
Inspection for backfilling first layer up to (-10 cm) of design bottom level for the marked footings as pe
Installation of GEWI bars and grouting for 8 mini piles at zone-1P, (34,37,40,43,54,49,55 & 64)
Drilling works for 8 Mini Piles at Zone-1P, (34,37,40,43,54,49,55 & 64)
Inspection of Concrete casting SRC, C(16-20) under Pile caps PC (55,57,59,61 & 63)
Inspection of AntI termite prior to casting concrete under Pile cap PC (55,57,59,61 & 63)
Inspection of Coordinates prior to start drilling works for 8 Mini Piles in Zone -1P (34,37,40,43,54,49,55
Inspection for Location, level and formwork prior to casting blinding concrete under pile caps PC (55,57
Structural repair for Exterior Elevation as highlighted area in RFI (KAIG#-RFI-PT-S-0264-00), Public Toilet
Surface preparation prior to start waterproofing of Boundary Wall - inner face , Span 42 & 45.
AS PER APPROVED SHOP DWG. KAIG3-SD-PT-A-GA-3304-00 RAIN WATER DRAINAGE PIPE SHOWN IN
Installation of GEWI bars and grouting for 9 mini piles at zone-1P, (33,35,39,41,45,46,50,78 & 65)
Installation of GEWI bars and grouting for 10 mini piles at zone-1P, (36,38,47,48,51,52,57,58,62 & 66)
Probing and Grouting works at Zone 2E, MCPE (59 Points)
Probing and Grouting works at Zone 2E, MCPE (91 Points)
Drilling works for 19 Mini Piles at Zone-1P, (33,35,36,3839,41,45,46,47,48,51,52,50,78,57,58,,62,65 &66
Inspection of Coordinates prior to start drilling works for 19 Mini Piles in Zone -1P,33,35,36,3839,41,4
Inspection for Coordinates prior to start Probing works at zone 2E, MCPE, (91 Points).
Inspection for Coordinates prior to start Probing works at zone 2E, MCPE, (59 Points).
Inspection of concrete SRC, C(16-20)casting under strip footing between axis 01/AP-01/AQ outer line of
Inspection of AntI termite prior to casting concrete under strip footing between axis 01/AP-01/AQ outer
Inspection for Location, level and formwork prior to casting blinding concrete of Strip footing between
Top of Rock level of Retaining wall as per attachment.
Notification for Demolition of Ticketing Booth #3, Done by 2nd Stage Contractor.
Inspection for Coordinates and level of footing and kicker of Ticketing Booth #1.
Inspection of Concrete casting SRC, C(16-20) under Pile caps PC (65,67 & 69)
Inspection of AntI termite prior to casting concrete under Pile cap PC (65,67 & 69)
Inspection for Location, level and formwork prior to casting blinding concrete under pile caps PC (65,67
Top level of existing footing (876.19) and coordinates of wall in Ticketing Booth - 1.
Shuttering for DOME - Ticketing Booth #2.
Concrete Pouring for Kicker of Ticketing Booth #1, (H=100mm).
Concrete Pouring for DOME - Ticketing Booth #2.
Installation of GEWI bars and grouting for 10 mini piles at zone-1P, (42,44,53,56,59,60,61,63,67 &68)
Drilling works for 10 Mini Piles at Zone-1P, (42,44,53,56,59,60,61,63,67 &68)
Inspection of Coordinates prior to start drilling works for 10 Mini Piles in Zone -1P. (42,44,53,56,59,60,
Notification for Demolition of existing Blinding for Boundary Wall as highlighted in attached drawing (
Inspection of Concrete casting SRC, C(16-20) under Pile caps PC (78 & 186)
Inspection of AntI termite prior to casting concrete under Pile cap PC (186)
Inspection for Location, level and formwork prior to casting blinding concrete under pile caps PC (78 &1
Notification for Demolition of existing Boundary Wall as highlighted in attached drawing - due to appro
Notification for Demolition of existing Boundary Wall as highlighted in attached drawing - due to appro
Structural repair for Exterior Elevation as highlighted area in RFI (KAIG#-RFI-PT-S-0264-00), Public Toilet
Existing level of Plaza area and in between Existing & Temporary Fence.
Notification prior to proceed for Concrete Repair of External Elevations of Public Toilet-5.
Notification prior to proceed for Concrete Repair of External Elevations of Public Toilet-4.
Installation of Stone Cladding for Concrete Boundary Wall outer face - up to wall level;Column # 8 - 15.
Top level of backfill prior to cast Blinding Concrete for Slab on Grade of Management Buiding; done by
Probing and Grouting works at Zone 2M, MCPE (80 Points)
Probing and Grouting works at Zone 2M, MCPE (49 Points)
Inspection for Coordinates prior to start Probing works at zone 2M, MCPE, (80 Points).
Inspection for Coordinates prior to start Probing works at zone 2M, MCPE, (49 Points).
Inspection of Concrete casting C (16-20) under Shear key at PC (53,55,57,59,61 &63)
Inspection of AntI termite prior to casting concrete under Shear key at PC (53,55,57,59,61 & 63)
Inspection for Location, level and formwork prior to casting blinding concrete for shear keys at PC(53,
Installation of Stone Cladding for Concrete Boundary Wall outer face (except column),wall span #81 & 8
Top Level and Coordinates of existing blinding for Foundation of Boundary Wall and Column, span 19, 2
Concrete Pouring for Slab on Grade of Tower-1; Mix Design C32/40 - (Severe Exposed).
Probing and Grouting works at zone 2M, MCPE (96 Points)
Inspection of Concrete casting SRC, C(16-20) under PC (71,73 & 75)
Inspection of AntI termite prior to casting concrete under PC (71,73 &75)
Inspection for Coordinates prior to start Probing works at zone 2M MCPE, (96 Points).
Inspection for Location, level and formwork prior to casting blinding concrete under pile caps PC(71,73
Inspection for Existing level on top of foundation and top of Kicker and Coordinates for Ticketing Booth
Probing and Grouting works for tunnels in Carboniferous garden ( 35 Points)
Inspection for Coordinates prior to start Probing worksfor tunnels in Carboniferous garden, (35 Points).
Installation of Reinforcement and Shuttering for Kicker of Ticketing Booth #1, (H=100mm).
Coordinates for Wall - Centerline of Physic Garden
Inspection of Concrete casting C (16-20) under Shear key at PC (66,68,70,72,74 &76)
Inspection of AntI termite prior to casting concrete under Shear key at PC (66,68,70,72,74 &76)
Inspection of Concrete casting SRC, C(16-20) under PC (181,183,185 & 187)
Inspection of AntI termite prior to casting concrete under PC (181,183,185 &187)
Inspection for Location, level and formwork prior to casting blinding concrete for shear keys at PC(66,
Inspection to check formation level prior to casting mass concrete at zone-2 up bottom of footing desig
Inspection for Location, level and formwork prior to casting blinding concrete under pile caps PC(181,
Reinforcement for Slab on Grade of Tower-1.
Setting out of Grooves for Exterior Elevation as per attached drawing prior to install all Grooves for Fire
Inspection for Plastering Guide lines at Public Toilet #3; done by 2nd Stage Contractor.
Inspection for Plastering Guide lines at Site Tower #2; done by 2nd Stage Contractor.
Probing and Grouting works at Zone-5, Bridges in Jurassic garden ( 56 Points)
Inspection for Coordinates prior to start Probing works at zone-5, Bridges in Jurassic garden, (56 Points
Concrete Pouring for Post beside existing Column of Management Building (as per SCR-MB-G-0031-00)
Shuttering for Post beside existing Column of Management Building (as per SCR-MB-G-0031-00) and as
Inspection of concrete casting C (16-20) under Shear key at PC (65,67,69,71,73 &75)
Inspection of AntI termite prior to casting concrete under Shear key at PC (65,67,69,71,73 &75)
Inspection for Location, level and formwork prior to casting blinding concrete at Shear key PC(65,67,6
Probing and Grouting works at zone-2G, ( 3 Points)
Probing and Grouting works at zone-2G, MCPE, (15 Points)
Inspection of concrete casting SRC, C(16-20) under PC (188,189,190,191 &192)
Inspection of AntI termite prior to casting concrete under PC (188,189,190,191 & 192)
Inspection for Location, level and formwork prior to casting blinding concrete under pile caps PC(188,
Inspection for Coordinates prior to Probing works at Zone 2G, ( 3 Probes)
Inspection for Coordinates prior to Probing works at Zone 2G, MCPE (15 Probes)
Structural repair for Exterior Elevation as highlighted area in RFI (KAIG#-RFI-TT-S-0279-00), Tower-1.
Steel reinforcement for Post beside existing Column of Management Building (as per SCR-MB-G-0031-0
Solid Block wall beside Grade Beam of Management Building (as per SCR-MB-G-0031-00); done by 2nd
Inspection of Reinforcement for DOME - Ticketing Booth #2.
Top level and Verticality of Concrete Column for Boundary Wall (Col. 76-80).
Probing and Grouting works at zone-2H, Tunnel-1, (74 Points)
Inspection for Coordinates prior to Probing works at Zone 2H, Tunnel-1 (74 Probes)
Notification to proceed with concrete testing for existing water tank as per Letter DAR-ZHG-KAIG-GEN-4
Casting of Blinding Concrete for Blockworks beside Grade Beam of Management Building (as per SCR-
Application for Anti-Termite prior to cast Blind Concrete for Blockworks beside Grade Beam as per SC
After Demolition of existing Raft Foundation as per approved Notification (KAIG3-RFI-GN-S-0326-00)
Inspection of concrete casting SRC, C(16-20) under PC (82,80 &78)
Inspection of AntI termite prior to casting concrete under PC (82,80 &78)
Inspection for Location, level and formwork prior to casting blinding concrete under pile caps PC(78,80
Notification to start excavation for Water Gardens Boundary Wall for Cavity Probing Platform as per hig
Concrete Pouring for Columns of Boundary Wall , Column #76 - 80. Concrete Mix Design C32/40 - Very
Inspection of concrete casting C(16-20) under PC (94,95,96,97 & 98)
Inspection of AntI termite prior to casting concrete under PC (94,95,96,97 & 98)
Inspection of Blinding Concrete casting C(16-20) at PC (181,182,183,184,185 &186)
Inspection of AntI termite prior to casting concrete at PC (181,182,183,184,185 &186)
Inspection for Location, level and formwork prior to casting blinding concrete SRC C(16-20) under pile
Inspection for Location, level and formwork prior to casting blinding concrete for shear keys in PC(18
Probing and Grouting works at zone-2H, Tunnel-1, (60 Points)
Rock and Stone Boulder - Placement No.109, done by 2nd Stage Contractor.
Rock and Stone Boulder - Placement No.110, done by 2nd Stage Contractor.
Rock and Stone Boulder - Placement No.111, done by 2nd Stage Contractor.
Rock and Stone Boulder - Placement No.113, done by 2nd Stage Contractor.
Rock and Stone Boulder - Placement No.112, done by 2nd Stage Contractor.
Inspection for Coordinates prior to start Probing works at zone-2H, Tunnel-1, (60 Points).
Notification for Demolition of Ticketing Booth #1, Done by 2nd Stage Contractor.
Notification prior to proceed for Waterproofing Work of Existing Water Tank.
Closing of Shuttering for Columns of Boundary Wall , Column #76 - 80."Done by 2nd Stage Conctractor"
Probing and Grouting works at zone-2H, Tunnel-1, (94 Points)
Inspection for Coordinates prior to start Probing works at zone-2H, Tunnel-1, (94 Points).
Inspection of application of AntI termite prior to Blinding concreting under pile cap at PC-91,92 & 93.
Probing and Grouting works at zone-2H, Tunnel-1, (68 Points)
Inspection for Coordinates prior to start Probing works at zone-2H, Tunnel-1, (68 Points).
Inspection of Blinding Concrete (C16-20) under pile caps (81,79 &77)
Inspection for AntI termite prior to casting concrete under pile caps (81,79 & 77)
Inspection for location, level and formwork prior to casting blinding concrete C( 16-20) under pile caps
Inspection of PVC Conduit & Weatherproof Box for Power System Layout at Boundary Wall Zone C as
Inspection of PVC Conduit & Weatherproof Box for CCTV System Layout at Boundary Wall Zone C as p
Notification for Demolition of Ticketing Booth #1, Done by 2nd Stage Contractor.
Application for Anti-Termite prior to cast Blind Concrete for Slab on Grade of Tower-1; (done by 2nd St
Concrete Pouring for Retaining Wall - Corebel Extension (for Span 76-90) as per attached SD-BO-S-00
Shuttering for Retaining Wall - Corebel Extension (for Span 76-90) as per attached SD-BO-S-0005-00.
Rebar Planting for Retaining Wall - Corebel Extension (for Span 76 - 90) as per attached SD-BO-S-0005
Structural repair for Exterior Elevation as highlighted area in RFI (KAIG#-RFI-PT-S-0265-00), Toilet-2
Blinding Concrete for Slab on Grade of Tower-1; "Done by 2nd Stage Contractor". Mix Design- C 16/20 (
Reinforcement Steel Bars of Columns for Boundary Wall and 3-sides Shuttering prior to close Shutteri
Concreting of Blinding / Mass concrete for PC-91,92 & 93.
Inspection for lay-out coordinates, formworks and level prior to concreting of blinding mass concrete a
Surface preparation on Concrete Boundary Wall outer face (except column), prior to install Riyadh Ston
7 Additional Probing & Grouting works at zone 2E MCPE foundation, As per comment in RFI-CO-GE-0093
4 Additional Probing & Grouting works at zone 2H MCPE foundation, As per comment in RFI-CO-GE-008
3 Additional Probing & Grouting works at zone 2G MCPE foundation, As per comment in RFI-CO-GE-007
4 Additional Probing & Grouting works at zone 2H MCPE foundation, As per comment in RFI-CO-GE-007
Notification prior to proceed for Concrete Repair of External Elevations of Site Toilet-3.
Notification prior to proceed for Concrete Repair of External Elevations of Site Toilet-4.
Render Finish Sample with 2 types of texture as per attahed plan; Toilet #1.
Inspection of PVC Conduit & Weatherproof Box for CCTV System Layout at Boundary Wall Zone B as p
Inspection of PVC Conduit & Weatherproof Box for Power System Layout at Boundary Wall Zone B as
Inspection to check formation level prior to casting concrete- blinding level at the bottom of footings
Casting of Blinding Concrete for Blockworks beside Grade Beam of Management Building (as per SCR-
Inspection of AntI termite prior to casting blinding concrete under pad footings at VIP Auditorium at gr
Inspection for lay-out coordinates, Level, plumbness and formworks for blinding under footing pad at V
Inspection of blinding Concrete (C16-20) under Shear keys design level for PC (91,92,93,94,95,96,97 & 9
Inspection for AntI termite prior to casting concrete under Shear keys for PC (91,92,93,94,95,96,97 &98)
Inspection for location, level and formwork prior to casting blinding concrete C( 16-20) for shear keys
Concrete Pouring for Roof Slab of Ticketing Booth #2; Mix Design - 32/40 (Very Severe Exposed)
Application for Anti-Termite prior to cast Blind Concrete for Blockworks beside Grade Beam as per SC
Notification prior to proceed for Concrete Repair of External Elevations of Site Tower-2.
Concrete Pouring for Retaining Wall - Corebel Extension (for Span 45 - 48) as per attached SCR-BO-S-
Shuttering for Retaining Wall - Corebel Extension (for Span 45 - 48) as per attached SCR-BO-S-0012-00
Rebar Planting for Retaining Wall - Corebel Extension (for Span 45 - 48) as per attached SCR-BO-S-001
1 Additional Probing & Grouting works at zone 2K, As per comment in RFI-CO-GE-0071
INSPECTION OF DRAINAGE MODIFICATION AS PER NEW ARCHITECT LAYOUT FOR EXECUTED WORKS
Probing and Grouting works at Zone 2m, MCPE foundation, ( 51 Probes)
Inspection for Coordinates prior to Probing works at Zone 2M, MCPE foundation (51 Probes)
4 Additional Probing &Grouting works at zone 2J,As per comment in RFI-CO-GE-0074
6 Additional Probing &Grouting works at zone 2K,As per comment in RFI-CO-GE-0069
Probing and Grouting works at Zone 2D, MCPE foundation, (29 Points)
Inspection for Coordinates prior to start Probing at Zone 2D, MCPE foundation, (29 Points)
Casing Centeralizer (for Mini Piles Tpe-01)
Installation of Stone Cladding for Concrete Boundary Wall outer face (except column),wall span #47-48.
CMU laying (first layer) beside Grade Beam of Management Building (as per SCR-MB-S-0015-01), highli
Cosmetic repair for exterior elevation as per highlighted area in RFI (KAIG3-RFI-TT-S-0279-00) Site Tow
Cosmetic Repair for Exterior Elevations as per hihlighted area in RFI (KAIG3-RFI-PT-S-0265-00) Toilet #
2 PCS. RAIN WATER PIPE (UPVC CLASS 4) 75mm DIA & 1 PC. SLEEVE PIPE ( UPVC CLASS 4) FOR COND
Concreting for PC-193,194,199&200 Mass concrete (16/20)
Inspection for Application of AntI termite for PC-193,194,199,&200 prior to Concrete.
Inspection for layout coordinates,level and formwork for PC 193,194,199 & 200 prior to mass concrete.
Probing and Grouting works at Small Mosque, (50 Points)
Probing and Grouting works at Small Mosque, (60 Points)
Inspection for Coordinates prior to start Probing works at small Mosque, (50 Points)
Inspection for Coordinates prior to start Probing works at small Mosque, (60 Points)
Inspection of Reinforcement for Roof Slab as per attached drawing for Ticketing Booth #2.
Probing and Grouting works at Zone 2E, MCPE foundation, (91 Points)
4 Additional Probing &Grouting works at zone 2K,As per comment in RFI-CO-GE-0063
Inspection for Coordinates prior to start Probing at Zone 2E, MCPE foundation, (91 Points)
Concreting for PC-197 Mass concrete (16/20)
Inspection for Application of AntI termite for PC-197 prior to Mass concrete.
Inspection for layout coordinates,level and formwork for PC 197 under pile cap prior to mass concrete.
Visual inspection of PVC conduit & boxes for Fire Alarm at Ticket Booth#2 as per highlighted drawing
Visual inspection of PVC conduit & boxes for Lighting System at Ticket Booth #2 as per highlighted d
Probing and Grouting works at Zone 2D, MCPE foundation, (67 Points)
Inspection for Coordinates prior to start Probing at Zone 2D, MCPE foundation, (67 Points)
4 Additional Probing &Grouting works at zone 2K,As per comment in RFI-CO-GE-0062
Probing and Grouting works at Zone 2J, MCPE foundation, (2 Points)
Probing and Grouting works at Zone 2H, MCPE foundation, (3 Points)
Inspection for Coordinates prior to start Probing at Zone 2H, MCPE foundation, (3 Points)
Inspection for Coordinates prior to start Probing at Zone 2J, MCPE foundation, (3 Points)
Inspection of Shuttering for Roof Slab as per attached drawing for Ticketing Booth #2.
Inspection for blinding concreting of PC-195,196 and 198 (Design 16/20) (Mass concrete)
Application of Cosmetic and Structure Repair as per attached drawing for all elevations
4 Additional Probing &Grouting works at zone 2N,As per comment in RFI-CO-GE-0048
3 Additional Probing &Grouting works at zone 3,As per comment in RFI-CO-GE-0033
1 Additional Probing &Grouting works at zone 3,As per comment in RFI-CO-GE-0043
4 Additional Probing &Grouting works at zone 2M,As per comment in RFI-CO-GE-0056
3 Additional Probing &Grouting works at zone 2M,As per comment in RFI-CO-GE-0055
Inspection for Application of AntI termite for PC-195,196 AND 198 (Mass concrete)
Inspection for location,level &formworks prior to casting concrete under pile cap 195-196 and 198
Inspection for Rock surface level for north administration building prior to start backfilling to the level u
Probing and Grouting works at Zone 2E, MCPE foundation, (39 Points)
Probing and Grouting works at Zone 2E, MCPE foundation, (93 Points)
Probing and Grouting works at Zone 2E, MCPE foundation, (39 Points)
Inspection of Concreting(C16-20) under pile caps (83,84)
Inspection for AntI termite prior to casting concrete under pile caps(83,84)
Inspection for location and level and formwork prior to casting concrete under pile caps (83,84)
Inspection for Coordinates prior to start Probing at Zone 2E, MCPE foundation, (39 Points)
Inspection for Coordinates prior to start Probing at Zone 2E, MCPE foundation, (93 Points)
Inspection for Coordinates prior to start Probing at Zone 2E, MCPE foundation, (39 Points)
Probing and Grouting works at Zone 2E, MCPE foundation, (71 Points)
Probing and Grouting works at Zone 2E, MCPE foundation, (96 Points)
Inspection for Coordinates prior to start Probing at Zone 2E, MCPE foundation, (71 Points)
Inspection for Coordinates prior to start Probing at Zone 2E, MCPE foundation, (96 Points)
Surface preparation on Concrete Boundary Wall outer face (except column), prior to install Riyadh Ston
Inspection for Roof - Bottom Slab Level (880.11) prior to install reinforcement and Shuttering of Roof Sl
AntI termite prior to casting concrete under pile caps(89-90-85) 73.9m3
Concreting under pile caps (89-90-85)
Formation level prior of casting mass concrete blinding level for pile cap, strip footing at grid 01/A to 0
Inspection for location and level and formwork prior to casting concrete under pile caps (89-90-85)
Casting of Blinding Concrete for Blockworks beside Grade Beam of Management Building (as per SCR-
Installation of Stone Cladding for Concrete Boundary Wall outer face (except column),wall span #43 &
Concrete Pouring for Retaining Wall - Corebel Extension (for Span 42 - 44) as per attached SCR-BO-S-
Shuttering for Retaining Wall - Corebel Extension (for Span 42 - 44) as per attached SCR-BO-S-0012-00
Rebar Planting for Retaining Wall - Corebel Extension (for Span 42 - 44) as per attached SCR-BO-S-001
Probing and Grouting works at Zone 2G, MCPE foundation, (57 Points)
Probing and Grouting works at Zone 2H, MCPE foundation, (29 Points)
Probing and Grouting works at Zone 2E, MCPE foundation, (94 Points)
Inspection for Coordinates prior to start Probing at Zone 2H, MCPE foundation, (29 Points)
Inspection for Coordinates prior to start Probing at Zone 2G, MCPE foundation, (57 Points)
Inspection for Coordinates prior to start Probing at Zone 2E, MCPE foundation, (94 Points)
INSPECTION OF DRAINAGE MODIFICATION AS PER NEW ARCHITECT LAYOUT FOR EXECUTED WORKS
Application for Anti-Termite prior to cast Blind Concrete for Blockworks beside Grade Beam as per SC
Excavated area prior to proceed for Waterproofing as attached Notification for Excavation (RFI-BO-S-02
8 Additional Probing &Grouting works at zone 1D,As per comment in RFI-CO-GE-0038
1 Additional Probing &Grouting works at zone 1E,As per comment in RFI-CO-GE-0016
2 Additional Probing &Grouting works at zone 2L,As per comment in RFI-CO-GE-0031
2 Additional Probing &Grouting works at zone 2J,As per comment in RFI-CO-GE-0025
1 Additional Probing &Grouting works at zone 1D,As per comment in RFI-CO-GE-0013
Rock and Stone Boulder Placement No.25, done by 2nd Stage Contractor.
Rock and Stone Boulder Placement No.24, done by 2nd Stage Contractor.
Rock and Stone Boulder Placement No.23, done by 2nd Stage Contractor.
Rock and Stone Boulder Placement No.22, done by 2nd Stage Contractor.
Rock and Stone Boulder Placement No.21, done by 2nd Stage Contractor.
Probing and Grouting works at Zone 2G, MCPE foundation, (52 Points)
Probing and Grouting works at Zone 2H, MCPE foundation, (85 Points)
Inspection for Coordinates prior to start Probing at Zone 2G, MCPE foundation, (52 Points)
Inspection for Coordinates prior to start Probing at Zone 2H, MCPE foundation, (85 Points)
Notification prior to proceed for "Demolition of Existing Raft / Existing RC Platform" as per attahed SKET
Installation of Stone Cladding for Concrete Boundary Wall outer face (except column),wall span #42.
Installation of Stone Cladding for Concrete Boundary Wall outer face (except column),wall span #47-48.
Installation of Stone Cladding for Concrete Boundary Wall outer face (except column),wall span #45-46.
Inspection for Existing Curbstone Boundaries at Zone-1, 2, 3 & 4; done by 2nd Stage Contractor
Probing and Grouting works at Zone 1E, (6 Points)
Probing and Grouting works at Zone 2G, MCPE foundation, (77 Points)
Probing and Grouting works at Zone 2G, MCPE foundation, (64 Points)
Inspection for Coordinates prior to start Probing at Zone 1E, (6 Points)
Inspection for Coordinates prior to start Probing for MCPE foundation Zone 2G, (77 Points)
Inspection for Coordinates prior to start Probing for MCPE foundation Zone 2G, (64 Points)
Casting of Blinding Concrete for Blockworks beside Grade Beam of Management Building (as per SCR-
Probing and Grouting works at Zone 2G, MCPE foundation, (78 Points)
Probing and Grouting works at Zone 2H, MCPE foundation, (61 Points)
Inspection for Coordinates prior to start Probing for MCPE foundation Zone 2G, (78 Points)
Inspection for Coordinates prior to start Probing for MCPE foundation Zone 2H, (61 Points)
Visual inspection Mock-up installation of conduit and weatherproof box for CCTV System at boundary
Application for Anti-Termite prior to cast Blind Concrete for Blockworks beside Grade Beam, (done by 2
Probing and Grouting works at Zone 2J, MCPE foundation, (85 Points)
Probing and Grouting works at Zone 2K, MCPE foundation, (39 Points)
Blinding concreting for Shear key PC-1,2,3,4,5.6.7,8,9,10,11 and 12
Inspection of Anti termite prior to blinding concreting for shear key PC-1,2,3,4,5.6.7,8,9,10,11 and 12
Inspection for Coordinates prior to start Probing for MCPE foundation Zone 2J, (85 Points)
Inspection for Coordinates prior to start Probing for MCPE foundation Zone 2K, (39 Points)
Inspection of formation level prior to casting blinding for shear key PC 1,2,3,4,5,6,7,8,9,10,11 and 12 (A
Notification for Demolition of Ticketing Booth #1, Done by 2nd Stage Contractor.
Application of Curing Compound for Walls of Ticketing Booth #2.
Setting out of Grooves for Exterior Elevation as per attached drawing prior to install all Grooves for Toile
3 Additional Probing &Grouting works at zone 2M, As per comment in RFI-CO-S-0276
Probing and Grouting works at Zone 2J, MCPE foundation, (46 Points)
Probing and Grouting works at Zone 2K, MCPE foundation, (32 Points)
Probing and Grouting works at Zone 2K, MCPE foundation, (74 Points)
Probing and Grouting works at Zone 2J, MCPE foundation, (49 Points)
Probing and Grouting works at Zone 2J, MCPE foundation, (52 Points)
Concreting under pile caps 86&87 (Casting)
Inspection of formwork to cast concrete under pile caps 86&87
Inspection of applying anti termite prior to casting concrete under pile caps(86,87)
Inspection for Coordinates prior to start Probing for MCPE foundation Zone 2J, (46 Points)
Inspection of location &level prior to casting concrete under pile caps( 86&87) Axis 01-AQ,01-AR
Inspection for Coordinates prior to start Probing for MCPE foundation Zone 2K, (32 Points)
Inspection for Coordinates prior to start Probing for MCPE foundation Zone 2K, (74 Points)
Inspection for Coordinates prior to start Probing for MCPE foundation Zone 2J, (49 Points)
Inspection for Coordinates prior to start Probing for MCPE foundation Zone 2J, (52 Points)
Filling of tie rod holes by using HS Extra for External elevation of Security and Fire Control Building, Zone
Render Finish Sample with 3 types of texture as per attahed plan; Toilet #1.
Inspection for Existing Asphalt Boundaries at Zone-1, 2, 3 & 4; done by 2nd Stage Contractor
Notification prior to start Compaction for Slab on Grade preparation at Toilet-1. "Done by 2nd Stage Con
3 Additional Probing &Grouting works at zone 3, As per comment in RFI-CO-GE-0024
Probing and Grouting works at Zone 2J, MCPE foundation, (81 Points)
Probing and Grouting works at Zone 2J, MCPE foundation, (34 Points)
Inspection for Coordinates prior to start Cavity Probing for MCPE foundation Zone 2J, (81 Points)
Inspection for Coordinates prior to start Cavity Probing for MCPE foundation Zone 2J, (34 Points)
Concrete Pouring for Walls of Ticketing Booth #2; Mix Design - 32/40 (Severe Exposed)
Probing and Grouting works at Zone 2K, MCPE foundation, (65 Points)
Probing and Grouting works at Zone 2K, MCPE foundation, (91 Points)
Inspection for Coordinates prior to start Cavity Probing for MCPE foundation Zone 2K, (65 Points)
Inspection for Coordinates prior to start Cavity Probing for MCPE foundation Zone 2K, (91 Points)
Probing and Grouting works at Zone 2K, MCPE foundation, (54 Points)
Probing and Grouting works at Zone 2M, MCPE foundation, (33 Points)
Probing and Grouting works at Zone 2H, MCPE foundation, (54 Points)
Probing and Grouting works at Zone 2H, MCPE foundation, (67 Points)
Inspection for Coordinates prior to start Cavity Probing for MCPE foundation Zone 2K, (54 Points)
Inspection for Coordinates prior to start Cavity Probing for MCPE foundation Zone 2M, (33 Points)
Inspection for Coordinates prior to start Cavity Probing for MCPE foundation Zone 2H, (54 Points)
Inspection for Coordinates prior to start Cavity Probing for MCPE foundation Zone 2H, (67 Points)
Surface preparation on Concrete Boundary Wall outer face (except column), prior to install Riyadh Ston
Probing and Grouting works at Zone 2M, MCPE foundation, (82 Points)
Inspection for Coordinates prior to start Cavity Probing for MCPE foundation Zone 2M, (82 Points)
Notification prior to start Compaction for Slab on Grade preparation at Tower-1. "Done by 2nd Stage Co
Probing and Grouting works at Zone 2M, MCPE foundation, (88 Points)
Probing and Grouting works at Zone 2M, MCPE foundation, (36 Points)
Inspection for Coordinates prior to start Cavity Probing for MCPE foundation Zone 2M, (36 Points)
Inspection for Coordinates prior to start Cavity Probing for MCPE foundation Zone 2M, (88 Points)
Inspection of formwork to cast concrete under pile cap PC-88 (Mockup)
Probing and Grouting works at Zone 2M, MCPE foundation, (56 Points)
Inspection for Coordinates prior to start Cavity Probing for MCPE foundation Zone 2M, (56 Points)
Concrete Pouring for Retaining Wall - Corebel Extension, inner face (Span 2 - 7) as per attached SCR
Shuttering for Retaining Wall - Corebel Extension (for Span 2 - 7) as per attached SCR-BO-S-0012-00.
Rebar Planting for Retaining Wall - Corebel Extension (for Span 2 - 7) as per attached SCR-BO-S-0012-
Cosmetic Repair for Exterior Elevations as per hihlighted area in RFI (KAIG3-RFI-PT-S-0264-00), "Done b
Rock and Stone Boulder Placement No.20, done by 2nd Stage Contractor.
Rock and Stone Boulder Placement No.19, done by 2nd Stage Contractor.
Rock and Stone Boulder Placement No.18, done by 2nd Stage Contractor.
Rock and Stone Boulder Placement No.17, done by 2nd Stage Contractor.
Rock and Stone Boulder Placement No.16, done by 2nd Stage Contractor.
Rock and Stone Boulder Placement No.15, done by 2nd Stage Contractor.
Rock and Stone Boulder Placement No.14, done by 2nd Stage Contractor.
Rock and Stone Boulder Placement No.13, done by 2nd Stage Contractor.
Rock and Stone Boulder Placement No.12, done by 2nd Stage Contractor.
Rock and Stone Boulder Placement No.11, done by 2nd Stage Contractor.
Installation of Stone Cladding for concrete Boundary Wall outer face (except column),wall span #1 to 4.
Probing and Grouting works at Zone 2M, MCPE foundation, (45 Points)
Probing and Grouting works at Zone 2M, MCPE foundation, (88 Points)
Inspection for Coordinates prior to start Cavity Probing for MCPE foundation Zone 2M, (45 Points)
Inspection for Coordinates prior to start Cavity Probing for MCPE foundation Zone 2M, (88 Points)
Surface Preparation, cleaning and removing of Tierod pipe and Steel, prior to start Cosmetic Repair at
Mock up for casting concrete under minipiles PC-88
Anti Termite for mock up for casting concrete under minipiles (PC-88)
Level prior to casting concrete under minipiles PC-88 (Mock up)
1 Additional Probing &Grouting works at zone 2E, As per comment in RFI-CO-S-0270
9 Additional Probing &Grouting works at zone 2D, As per comment in RFI-CO-S-0271
3 Additional Probing &Grouting works at zone 1E, As per comment in RFI-CO-S-0233
Probing and Grouting works at Zone 2N, Child care, (78 Points)
Blinding concrete at PC-187,188,189,190,191,192,193,194,195,196,197,198,199 and 200 (Shear key)
Application of Anti Termite prior to blinding concrete at PC-187,188,189,190,191,192,193,194,195,196
Blinding level prior to concrete for PC-187,188,189,190,191,192,193,194,195,196,197,198,199 and 200
Inspection for formation rock level for Pile cap &strip footing (PC-187,188,189,190,191,192,193,194,1
Inspection for Coordinates prior to start Cavity Probing at Zone-2N Child care, (78 Points)
Installation and Alignment of Shuttering prior to concrete pouring for Walls of Ticketing Booth #2.
Application for Anti-Termite prior to cast Blind Concrete for Blockworks beside Grade Beam, (done by 2
Probing and Grouting works for front canopies at Zone 6, (14 Points)
Probing and Grouting works at Zone 1B, (29 Points)
Inspection for Coordinates prior to start Cavity Probing for front Canopies Zone 6, (14 Points)
Inspection for Coordinates prior to start Cavity Probing at Zone-1B, (29 Points)
Concrete Pouring for Retaining Wall - Corebel Extension, inner face (Span 8 - 11) as per attached SC
Probing and Grouting works at Zone 3 Large Mosque, (16 Points)
Inspection for Coordinates prior to start Cavity Probing at Zone-3 Large Mosque, (16 Points)
Excavation and Compaction of soil beside Grade Beam of Management Building, as per SCR-MB-S-0015
Notification prior to proceed Block Works beside Grade Beam of Management & Maintenane Building,
Installation of Steel Reinforcement for Walls of Ticketing Booth #2, prior to close shuttering; (Highlighte
Shuttering for Retaining Wall - Corebel Extension, inner face (Span 2, 3 & 8 - 11) as per attached SCR
Rebar Planting for Retaining Wall - Corebel Extension (for Span 2,3 & 8 - 11) as per attached SCR-BO-
Probing and Grouting works at Zone 3 Large Mosque, (42 Points)
Probing and Grouting works at Zone 3 Large Mosque, (74 Points)
5 Additional Probing &Grouting works at zone 2D, As per comment in RFI-CO-S-0269
3 Additional Probing &Grouting works at zone 2F, As per comment in RFI-CO-S-0263
2 Additional Probing &Grouting works at zone 2D, As per comment in RFI-CO-S-0268
1 Additional Probing &Grouting works at zone 2A, As per comment in RFI-CO-S-0188
Inspection for Coordinates prior to start Cavity Probing at Zone-3 Large Mosque, (74 Points)
Inspection for Coordinates prior to start Cavity Probing at Zone-3 Large Mosque, (42 Points)
Highlighted drawing showing External Elevation for Cosmetic and Structural repairing area prior to pro
18 Additional Probing &Grouting works at zone 1D, As per comment in RFI-CO-S-0172
1Additional and 1 Missing Probing &Grouting works at zone 2K, As per comment in RFI-CO-S-0183
1 Additional Probing &Grouting works at zone 2D, As per comment in RFI-CO-S-0257
Probing and Grouting works at Zone 2F, (97 Points)
Probing and Grouting works at Zone 3 Large Mosque, (80 Points)
Inspection for Coordinates prior to start Cavity Probing at Zone-3 Large Mosque, (80 Points)
Inspection for Coordinates prior to start Cavity Probing at Zone-2F, (97 Points)
INSPECTION OF BACKFILLING SOFT SAND BEDING FOR UNDERGROUND DRAINAGE IN WET AREA IN
Concrete Pouring for Retaining Wall - Corebel Extension, inner face (Span 1, 12 - 15) as per attache
Shuttering for Retaining Wall - Corebel Extension, inner face (Span 1, 12 - 15) as per attached SCR-B
Rebar Planting for Retaining Wall - Corebel Extension (for Span 1, 12 - 15) as per attached SCR-BO-S-
1 Additional Probing &Grouting works at zone 2J, As per comment in RFI-CO-S-0198
4 Additional Probing &Grouting works at zone 2L, As per comment in RFI-CO-S-0219
9 Additional Probing &Grouting works at zone 2C, As per comment in RFI-CO-S-0230
8 Additional Probing &Grouting works at zone 2C, As per comment in RFI-CO-S-0242
2 Additional Probing &Grouting works at zone 2G, As per comment in RFI-CO-S-0235
2 Additional Probing &Grouting works at zone 2C, As per comment in RFI-CO-S-0243
3 Additional Probing &Grouting works at zone 2L, As per comment in RFI-CO-S-0174
14 Additional Probing &Grouting works at zone 2J, As per comment in RFI-CO-S-0191
Probing and Grouting works at Zone 3 Large Mosque, (27 Points)
Probing and Grouting works at Zone 3 Large Mosque, (91 Points)
Inspection for Coordinates prior to start Cavity Probing at Zone-3 Large Mosque, (91 Points)
Inspection for Coordinates prior to start Cavity Probing at Zone-3 Large Mosque, (27 Points)
Rock and Stone Boulder Placement No. 1, done by 2nd Stage Contractor.
Blinding Concrete at PC-89,90,87,85,83,81,79,77,88,86,84,82,80 and 78.
Application of Termite prior to blinding concrete at PC-89,90,87,85,83,81,79,77,88,86,84,82,80 and 78.
Inspection for Blinding level for shear key PC-89,90,87,85,83,81,79,77,88,86,84,82,80 and 78.
Probing and Grouting works at Zone 2F, (47 Points)
Probing and Grouting works at Zone 2F, (65 Points)
Check Formation level prior of casting mass concrete- blinding level (VIP Auditorium)
Inspection for Coordinates prior to start Cavity Probing at Zone-2F, (47 Points)
Inspection for Coordinates prior to start Cavity Probing at Zone-2F, (65 Points)
Visual inspection of low current conduits & boxes executed by previous Contractor at Stage 2 for Fire
Visual inspection of low current conduits & boxes executed by previous Contractor at Stage 2 for Data
Visual inspection of low current conduits & boxes executed by previous Contractor at Stage 2 for Dat
Visual inspection of low current conduits & boxes executed by previous Contractor at Stage 2 for Fir
Visual inspection of conduit & boxes executed by previous Contractor at Stage 2 for Lightning System
Visual inspection of conduit & boxes executed by previous Contractor at Stage 2 for Containment Layo
Visual inspection of conduit & boxes executed by previous Contractor at Stage 2 for Power System at
Visual inspectionof bare copper conductor executed by previous Contractor at Stage 2 for Earthing &
Visual inspection of bare copper conductor executed by previous Contractor at Stage 2 for Earthing &
Visual inspection of Electrical conduits & boxes executed by previous Contractor at Stage 2 for Light
Visual inspection of Electrical conduit & boxes executed by previous Contractor at Stage 2 for Power
Visual inspection of Electrical conduit & boxes by previous Contractor at Stage 2 for Containment Lay
Concrete Pouring for Retaining Wall - Corebel Extension, inner face (Span 16 & 17) as per attached
Shuttering for Retaining Wall - Corebel Extension, inner face (Span 16 & 17) as per attached SCR-BO-S
Probing and Grouting works for front conopies, (34 Points)
Inspection for Coordinates prior to start Cavity Probing for front Canopies, (34 Points)
Inspection for Plastering Guide lines at Security and Fire Control Center (Elevation - 4 only).
Inspection for Plastering Guide lines at Security and Fire Control Center (Elevation -1, 2 & 3 only).
Highlighted drawing showing External Cosmetic repairing area prior to proceed with repairing works. Pu
Probing and Grouting works at Zone 1G, (78 Points)
Probing and Grouting works at Zone 1G, (67 Points)
Inspection for Coordinates prior to start Cavity Probing at Zone-1G, (145 Points)
2 Additional Probing &Grouting works at zone 2H As per comment in RFI-CO-S-0226
4 Additional Probing &Grouting works at zone 1E As per comment in RFI-CO-S-0171
1 Additional Probing &Grouting works at zone 1C As per comment in RFI-CO-S-0185
2 Additional Probing &Grouting works at zone 1C As per comment in RFI-CO-S-0184
4 Additional Probing &Grouting works at zone 2B As per comment in RFI-CO-S-0204
Probing and Grouting works at Zone 2D, (62 Points)
Inspection for Coordinates prior to start Cavity Probing at Zone-2D, (62 Points)
Rock and Stone Boulder Placement No.10, done by 2nd Stage Contractor.
Rock and Stone Boulder Placement No.9, done by 2nd Stage Contractor.
Rock and Stone Boulder Placement No.8, done by 2nd Stage Contractor.
Rock and Stone Boulder Placement No.7, done by 2nd Stage Contractor.
Rock and Stone Boulder Placement No.6, done by 2nd Stage Contractor.
Rock and Stone Boulder Placement No.5 done by 2nd Stage Contractor.
Rock and Stone Boulder Placement No.4 done by 2nd Stage Contractor.
Rock and Stone Boulder Placement No.3, done by 2nd Stage Contractor.
Rock and Stone Boulder Placement No.2, done by 2nd Stage Contractor.
Chipping to make rough surface and removing Bitumen Paint to extend Kicker of Retaining Wall (for Spa
Rebar Planting for Retaining Wall - Corebel Extension (for Span 1 to 5, 16 & 17) as per attached SCR-B
Notification prior to proceed for concrete repair of external elevation of Management & Maintenane Bui
Notification prior to proceed for concrete repair of external elevation of Security Fire Control Center.
Probing and Grouting works at Zone 2F, (86 Points)
Inspection for Coordinates prior to start Cavity Probing at Zone-2F, (86 Points)
Probing and Grouting works at Zone 2C, (32 Points)
Probing and Grouting works at Zone 2A, (29 Points)
Probing and Grouting works at Zone 2B, (42 Points)
Probing and Grouting works at Zone 2C, (27 Points)
Probing and Grouting works at Zone 2B, (29 Points)
Probing and Grouting works at Zone 2A, (84 Points)
After Excavated to level -0.50 from inspected Rock level surface at Zone-1(Survey Inspection)
Inspection for Coordinates prior to start Cavity Probing at Zone-2C, (32 Points)
Inspection for Coordinates prior to start Cavity Probing at Zone-2A, (29 Points)
Inspection for Coordinates prior to start Cavity Probing at Zone-2B, (42 Points)
Surface preparation on Concrete Boundary Wall outer face (except column), prior to install Riyadh Ston
Inspection for Coordinates prior to start Cavity Probing at Zone-2C, (27 Points)
Inspection for Coordinates prior to start Cavity Probing at Zone-2B, (29 Points)
Inspection for Coordinates prior to start Cavity Probing at Zone-2A, (84 Points)
Installation of Steel Reinforcement for Walls of Ticketing Booth #2, prior to close shuttering.
Concrete pouring for Column - Corebel Extension (Column 1, 4 to 10, 12 to 17 and 42 to 48) as per at
Installation and Alignment of Formwork Assembly for Wall, Ticketing Booth #2.
Notification to proceed for Excavation as per attached plan for Waterproofing of existing Boundary Wall
Installation of Stone Cladding for Concrete Boundary Wall outer face (except column),wall span #42.
Installation of Stone Cladding for Concrete Boundary Wall outer face (except column),wall span #43 & 4
Probing and Grouting works at Zone 1A, (14 Points)
Probing and Grouting works at Zone 2A South watch tower &bridge, (73 Points)
Inspection for Coordinates prior to start Cavity Probing at Zone-1A, (14 Points)
Inspection for Coordinates prior to start Cavity Probing at Zone-2A South water tower & Bridge, (73 Poin
Probing and Grouting works at Zone 1A, (55 Points)
Probing and Grouting works at Zone 1A, (57 Points)
Inspection for Coordinates prior to start Cavity Probing at Zone-1A, (112 Points)
Filling of tie rod holes by using HS Extra for External elevation of Tower-1, Zone-2B.
Highlighted drawing showing External Cosmetic and Structure repairing area prior to proceed with rep
Plastering Accessories and Rough Coat prior to proceed with Render - Sample (2m x 1.50m), at Toilet #
Cosmetic repairing for External surface as per highlight plan prior to proceed with Render Sample at Toi
Rock and Stone Boulder Placement No. 1, done by 2nd Stage Contractor.
2 Additional Probing and Grouting Works at Zone 1F, as per Comment in RFI-CO-S-0158-00
2 Additional Probing and Grouting Works at Zone 2M, as per Comment in RFI-CO-S-0167-00
1 Additional Probing and Grouting Works at Zone 1C, as per Comment in RFI-CO-S-0197-00
4 Additional Probing and Grouting Works at Zone 1K (RW), as per Comment in RFI-CO-S-0153-00
7 Additional Probing and Grouting Works at Zone 2N, as per Comment in RFI-CO-S-0165-00
Probing and Grouting Works at Zone 2D, (114 Points)
Probing and Grouting Works at Zone 2E, (87 Points)
Inspection for Coordinates prior to start Cavity Probing at Zone-2D, (114 Points)
Inspection for Coordinates prior to start Cavity Probing at Zone-2E, (87 Points)
INSTALLATION OF PVC CONDUIT & BOX FOR DATA SYSTEM AT TICKET BOOTH # 2 AS PER ATTACHED
INSTALLATION OF PVC CONDUIT & BOX FOR SECURITY sYSTEM AT TICKET BOOTH# 2 AS PER ATTACH
INSTALLATION OF PVC CONDUIT & SWITCH BOX FOR FIRE ALARM SYSTEM TICKET BOOTH # 2 AS PE
INSTALLATION OF 75mm PVC CONDUIT & JUNCTION BOX FOR LOW CURRENT SYSTEM AT TICKET BOO
INSTALLATION OF PVC CONDUIT & BOX FOR POWER SYSTEM AT TICKET BOOTH #2 AS PER ATTACHE
Probing and Grouting Works at Zone 2D, (86 Points)
Probing and Grouting Works at Zone 2E, (12 Points)
Inspection for Coordinates prior to start Cavity Probing at Zone-2D, (86 Points)
Inspection for Coordinates prior to start Cavity Probing at Zone-2E, (12 Points)
Highlighted drawing showing External elevation Cosmetic and Structure repairing area prior to proceed
Highlighted drawing showing External elevation Cosmetic and Structure repairing area prior to proceed
Filling of tie rod holes using HS Extra for external elevation of site toilet 1 at Zone 4A.
Filling of tie rod holes using HS Extra for external elevation of site toilet 2 at Zone 4D.
Surface preparation of Concrete Boundary Wall inner face including column, prior to install Riyadh S
Probing and Grouting Works at Zone 2F, (89 Points)
Probing and Grouting Works at Zone 2E, (33 Points)
Probing and Grouting Works at Zone 1A, (120 Points)
Inspection for Coordinates prior to start Cavity Probing at Zone-2F, (89 Points)
Inspection for Coordinates prior to start Cavity Probing at Zone-2E, (33 Points)
Inspection for Coordinates prior to start Cavity Probing at Zone-1A, (120 Points)
Surface preparation for External Wall of Site Tower #1 at Zone-2B.
Installation of Steel Reinforcement for Walls of Ticketing Booth #2, prior to close shuttering.
Probing and Grouting Works at Zone 2F, (83 Points)
Probing and Grouting Works at Zone 2E, (27 Points)
Probing and Grouting Works at Zone 2D, (45 Points)
Inspection for Coordinates prior to start Cavity Probing at Zone-2F, (83 Points)
Inspection for Coordinates prior to start Cavity Probing at Zone-2E, (27 Points)
Inspection for Coordinates prior to start Cavity Probing at Zone-2D, (45 Points)
Shuttering for Column - Corebel Extension (Column 16, 17 and 42 to 48) as per attached SCR-BO-S-0010
Concrete pouring for Column - Corebel Extension (Column 1, 4 to 10, 12 to 17 and 42 to 48) as per att
Rebar Planting for Column - Corebel Extension (Column 16, 17, and 42 to 48 ) as per attached SCR-BO-S
Top of rock level at child care (zone 3)
Inspection of Coordinates and levels for rock surface after excavation -.50cm from the previous rock lev
Mok up installation of conduit for CCTV System at boundary wall as per attached sketch dwg
Inspection for Coordinates points and As-built level for Existing Boundary Wall of Butterfly Garden don
Inspection for Coordinates points and As-built level for Existing Boundary Wall of Discovery Garden do
Inspection for Coordinates points and As-built level for Existing Boundary Wall of Maze Garden done by
Shuttering for Column - Corebel Extension (for Column 10, 12 to 15 and 1, 4 to 9) as per attached SCR-
Probing and Grouting Works at Zone 2H, (106 Points)
Probing and Grouting Works at Zone 2G, (12 Points)
Probing and Grouting Works at Zone 2C, (29 Points)
Inspection for Coordinates prior to start Cavity Probing at Zone-2H, (106 Points)
Inspection for Coordinates prior to start Cavity Probing at Zone-2G, (12 Points)
Inspection for Coordinates prior to start Cavity Probing at Zone-2C, (29 Points)
Surface preparation for External Wall prior to start Concrete Repair at Site Tower #1, Zone-2B.
Installation of Stone Cladding for Concrete Boundary Wall outer face (except column),wall span #43 & 4
Installation of Stone Cladding for concrete Boundary Wall outer face (except column),wall span #2 to 4.
Rebar Planting for Column and Corebel Extension (for Column 1, 4 to 9) as per attached SCR-BO-S-0010-
INSPECTION OF CONDENSATE DRAIN 40mm dia & WATER RAIN PIPE 75 mm dia
Probing and Grouting Works at Zone 1B, (111 Points)
Inspection for Coordinates prior to start Cavity Probing at Zone-1B, (111 Points)
7 Additional Probing and Grouting Works at Zone 1F, as per Comment in RFI-CO-S-0161-00
2 Additional Probing and Grouting Works at Zone 2M, as per Comment in RFI-CO-S-0157-00
6 Additional Probing and Grouting Works at Zone 1G, as per Comment in RFI-CO-S-0154-00
After Excavated to level -0.50 from inspected Rock level surface at Zone-1(Survey Inspection)
Inspection for existing ground level of Zone-5 (Crescent Area) prior to start excavation; Grid lines 01
Probing and Grouting Works at Zone 2B, (22 Points)
Probing and Grouting Works at Zone 2C, (76 Points)
Probing and Grouting Works at Zone 2C, (66 Points)
9 Additional Probing and Grouting Works at Zone 1H, as per Comment in RFI-CO-S-0134-00
6 Additional Probing and Grouting Works at Zone 2P, as per Comment in RFI-CO-S-0135-00
Rebar Planting for Column and Corebel Extension (for Column 10, 12 to 15) as per attached SCR-BO-S-0
Probing and Grouting Works at Zone 2P (Entrance desk), (31 Points)
Probing and Grouting Works at Zone 1B, (91 Points)
Probing and Grouting Works at Zone 2G, (34 Points)
Probing and Grouting Works at Zone 2G, (34 Points)
Probing and Grouting Works at Zone 2B, (31 Points)
Inspection for Coordinates prior to start Cavity Probing at Zone-2P (Entrance Desk), (31 Points)
Inspection for Coordinates prior to start Cavity Probing at Zone-1E,(60 Points)
Inspection of Coordinates prior to start Cavity Probing at Zone-2G,(75 Points)
Inspection for Coordinates prior to start Cavity Probing at Zone-2B, (22 Points)
Inspection for Coordinates prior to start Cavity Probing at Zone-2C, (76 Points)
7 Additional Probing and Grouting Works at Zone 2Q, as per Comment in RFI-CO-S-0109-01
18 Additional Probing and Grouting Works at Zone 1H(Auditorium &VIP area), as per Comment in RFI-C
10 Additional Probing and Grouting Works at Zone 2N, as per Comment in RFI-CO-S-0149-00
6 Additional Probing and Grouting Works at Zone 2Q, as per Comment in RFI-CO-S-0126-00
PROBING & GROUTING WORKS AT ZONE 2G (75 PTS.)
PROBING & GROUTING WORKS AT ZONE 2H (71 PTS.)
PROBING & GROUTING WORKS AT ZONE 2C (95 PTS.)
PROBING & GROUTING WORKS AT ZONE 1E (60 PTS.)
Surface Preparation prior to start Cosmetic repair on Toilet #1 as per RFI-PT-S-0186 and as shown on S
Surface preparation of Concrete Boundary Wall inner face (including column), prior to install Riyadh Sto
9 Additional Probing and Grouting Works at Zone 1L, as per comment in RFI-CO-S-0099
1 Additional Probing and Grouting Works at Zone 1P, as per comment in RFI-CO-S-0077-01
Inspection for Coordinates prior to start Cavity Probing at Zone-2B, (31 Points)
Inspection for Coordinates prior to start Cavity Probing at Zone-2C, (161 Points)
Probing and Grouting Works at Zone 2C, (71 Points)
Probing and Grouting Works at Zone 1B, (87 Points)
Probing and Grouting Works at Zone 2L, (132 Points)
4 Additional Probing and Grouting Works at Zone 1M , as per comment in RFI-CO-S-0091-00
4 Additional Probing and Grouting Works at Zone 1M , as per comment in RFI-CO-S-0092-00
Probing and Grouting Works at Zone 1M (Garden of choices), (08 Points)
Inspection for Coordinates prior to start Cavity Probing at Zone-2L, (132 Points)
Chipping for Non-Plumb Concrete which was done by 2nd Stage Contractor at Zone-4 Site Toilet
13 Additional Probing and Grouting Works at Zone 1K , as per comment in RFI-CO-S-0102
8 Additional Probing and Grouting Works at Zone 1K, as per comment in RFI-CO-S-0148
11 Additional Probing and Grouting Works at Zone 1J , as per comment in RFI-CO-S-0159
14 Additional Probing and Grouting Works at Zone 1J , as per comment in RFI-CO-S-0103
5 Additional Probing and Grouting Works at Zone 1L (RW-3A&RW-3B), as per comment in RFI-CO-S-015
10 Additional Probing and Grouting Works at Zone 1P(MCPE Tunnel), as per comment in RFI-CO-S-0125
8 Additional Probing and Grouting Works at Zone 1A, as per comment in RFI-CO-S-0141
1 Additional Probing and Grouting Works at Zone 1M (RW-2B), as per comment in RFI-CO-S-0144
11 Additional Probing and Grouting Works at Zone 1M and 1L, as per comment in RFI-CO-S-0136
10 Additional Probing and Grouting Works at Zone 1N north mosque, as per comment in RFI-CO-S-0124
5 Additional Probing and Grouting Works at Zone 1J policene garden, as per comment in RFI-CO-S-0137
Setting / Laying of Rock and Boulder Stone "Mock-up"
Installation of Stone Cladding for concrete Boundary Wall outer face (except column),wall span #5 - #9.
Concrete pouring for Kicker and Upstand Foundation (Additional / Extension) at Ticketing Booth #2.
Probing and Grouting Works at Zone 2B , (102 Points)
Probing and Grouting Works at Zone 2A , (14 Points)
Inspection for Coordinates prior to start Cavity Probing at Zone-1B, (87 Points)
Inspection for Coordinates prior to start Cavity Probing at Zone-2C, (71 Points)
Inspection for Coordinates prior to start Cavity Probing at Zone-2H, (71 Points)
Installation of Formworks for foundation upstand (Additional / Extension) to match Wall Layout.
Installation of "Kicker Formwork" for Ticketing Booth - Foundation Upstand (H=100mm).
Installation of Formworks for foundation upstand (Additional / Extension)
Installation of additional steel reinforcement (rebars) for foundation upstand to match with wall layout
Inspection for Plastering Guide for Site Toilet.
Inspection for Coordinates prior to start Cavity Probing at Zone-2H, (34 Points)
Inspection for Coordinates prior to start Cavity Probing at Zone-1B, (91 Points)
Inspection for Coordinates prior to start Cavity Probing at Zone-2G, (34 Points)
Probing and Grouting Works at Zone 2J , (109 Points)
Probing and Grouting Works at Zone 1C , (42 Points)
Probing and Grouting Works at Zone 1C , (34 Points)
Investigation of rock surface at zone -4 (pile cap strip footing and deviding wall)
Investigation of rock surface at zone -2 (VIPAuditerium only)
Adjustment of Existing "Starter Bar" (done by 2nd Stage Contractor) to match with the layout of wall
Installation of additional steel reinforcement (rebars) for foundation upstand to match with wall layout
Probing and Grouting Works at Zone 1D , (39 Points)
Probing and Grouting Works at Zone 1E , (8 Points)
Probing and Grouting Works at Zone 2J , (82 Points)
Probing and Grouting Works at Zone 2J , (34 Points)
Probing and Grouting Works at Zone 2K , (34 Points)
Inspection for Coordinates prior to start Cavity Probing at Zone-1C, (34 Points)
Inspection for Coordinates prior to start Cavity Probing at Zone-2A, (14 Points)
Inspection for Coordinates prior to start Cavity Probing at Zone-2B, (102 Points)
Inspection for Coordinates prior to start Cavity Probing at Zone-1D, (39 Points)
Inspection for Coordinates prior to start Cavity Probing at Zone-1E, (8 Points)
Inspection for Coordinates prior to start Cavity Probing at Zone-1C, (42 Points)
Inspection for Coordinates prior to start Cavity Probing at Zone-2J, (109 Points)
Probing and Grouting Works at Zone 2A , (83 Points)
Chipping for Non-Plumb Concrete which was done by 2nd Stage Contractor at Zone-3 Site Toilet
Probing and Grouting Works at Zone 2A , (55 Points)
Setting / Laying of Rock and Boulder Stone "Mock-up"
Installation / Fixing of starter bars (Planting bars) to match with the layout of wall as per approved S
Probing and Grouting Works at Zone 1C , (97 Points)
Probing and Grouting Works at Zone 1C , (74 Points)
Probing and Grouting Works at Zone 2K , (81 Points)
Inspection for Coordinates prior to start Cavity Probing at Zone-2J, (116 Points)
Inspection for Coordinates prior to start Cavity Probing at Zone-2K, (115 Points)
Inspection for Coordinates prior to start Cavity Probing at Zone-1C, (171 Points)
Installation of Stone Cladding for concrete Boundary Wall outer face (except column),wall span #10 - #1
Installation of Stone Cladding for concrete Boundary Wall outer face (except column),wall span #5 - #9.
Witness for setup and Tensile Testing for MPTP-1
Inspection for Coordinates prior to start Cavity Probing at Zone-2A, (138 Points)
Inspection for Plastering Guide for external elevation to justify the type of required repairing for co
Inspection for Plastering Guide for external elevation to justify the type of required repairing for
Coordinate points for Ticketing Booth #2 Layout
Installation of additional steel reinforcement (rebars) for foundation upstand to match with wall layout
Adjustment of Existing "Starter Bar" (done by 2nd Stage Contractor) to match with the layout of wall
Inspection for Coordinates prior to start Cavity Probing at Zone-2L, (90 Points)
Inspection for Coordinates prior to start Cavity Probing at Zone-2A, (89 Points)
Probing and Grouting Works at Zone 2A , (89 Points)
Probing and Grouting Works at Zone 2L , (90 Points)
3 Additional Probing and Grouting Works at Zone 1 North tower, as per comment in RFI-0073-1 and RFI
Inspection for Coordinates prior to start Cavity Probing at Zone-1D, 164 Points
Probing and Grouting Works at Zone 1D, 164 Points
Probing and Grouting Works at Zone 1E, 245 Points
Excavation for Investigation of Rock Surface at Zone-1 (Pile Cap, Strip Footing and Dividing Wall); "exc
Excavation for Investigation of Rock Surface at Zone-3 Gridlines W to P (Perimeter Strip Footing,Pile C
Excavation for Investigation of Rock Surface at Zone-2 Gridlines AA to AW (Perimeter Strip Footing,Pil
Platform Excavation at Zone-7
Chipping for Non-Plumb Concrete which was done by 2nd Stage Contractor.
Inspection for Coordinates prior to start Cavity Probing at Zone-1E, 245 Points
Existing level before & after removing / disposal, Quantity-22
Inspection for Plastering Guide for external elevation to justify the type of required repairing for c
Platform Excavation at Zone-6
Inspection for Coordinates prior to start Cavity Probing at Zone-1H, 430 Points
Probing and Grouting Works at Zone 2M, 112 PointsProbing and Grouting Works at Zone 1F, 98 Point
Probing and Grouting Works at Zone 2N, 131 Points
Inspection for Coordinates prior to start Cavity Probing at Zone-2M, 112 Points
Inspection for Coordinates prior to start Cavity Probing at Zone-1G, 74 Points
Inspection for Coordinates prior to start Cavity Probing at Zone-2N, 131 Points
Inspection for Coordinates prior to start Cavity Probing at Zone-1F, 98 Points
Existing level before and after disposal of QUANTITY-15.
Coordinate points for Ticketing Booth #2 Layout
Installation of Mini Preliminary Test Piles (MPTP-2, 3 & 4), 3 Points
Probing and Grouting Works at Zone 1H (Auditorium and VIP Area), 430 Points
Probing and Grouting Works at Zone 1F, 183 Points
Inspection for Coordinates prior to start Cavity Probing at Zone-1H, 430 Points
Setting / Laying of Rock and Boulder Stone "Mock-up"
100mm Depth Sand Bed for Rock and Boulder Stone - "Mock-up"
Installation of Stone Cladding for concrete Boundary Wall outer face (except column),wall span #10 - #1
Inspection for Coordinates prior to start Cavity Probing at Zone-1F, 85 points
Inspection for Coordinates prior to start Cavity Probing at Zone-1G, 112 points
Probing and Grouting Works at Zone 1J, 83 Points
Probing and Grouting Works at Zone 1F, 104 Points
Probing and Grouting Works at Zone 2M, 191 Points
Inspection for Coordinates prior to start Cavity Probing at Zone-1J, 83 points
Inspection for Coordinates prior to start Cavity Probing at Zone-2Q (North Admin.), 96 points
Inspection for Coordinates prior to start Cavity Probing at Zone-2R (North Admin.), 92 points
4 Additional Probing and Grouting Works at Zone 1N; as per comments in RFI-0086-00 (74 + 4 Points).
11 Additional Probing and Grouting Works at Zone 1N; as per comments in RFI-0082-00 (163 + 11 Points
Existing level before and after disposal of QUANTITY-18.
Excavation for Investigation of Rock Surface at Zone-1 & 2 (Pile Cap, Strip Footing, Dividing Wall and Au
Inspection for Existing level on top of foundation - Ticketing Booth (Gridline 7 and 6)
Inspection for Coordinates prior to start Cavity Probing at Zone-1J, 86 points
Inspection for Coordinates prior to start Cavity Probing at Zone-1L, 10 points
Concrete pouring for Plain Concrete of Traverse Point (as highlighted) - 26 Pieces
Inspection for Coordinates prior to start Cavity Probing at Zone-1L & 1M (Garden of Choices), 108 points
6 Additional Probing and Grouting Works at Zone 1P; as per comments in RFI-0079-00 (106 + 6 Points).
11 Additional Probing and Grouting Works at Zone 1P, as per comment in RFI-0077-00 (75 + 11 Points).
4 Additional Probing and Grouting Works at Zone 1A North Tower; as per comment in RFI-0075-00 (46 +
Probing and Grouting Works at Zone 1G, 321 Points
Probing and Grouting Works at Zone 1K (RW-3B & RW-4), 32 Points
Probing and Grouting Works at Zone 1L (RW-3A & 3B), 39 Points
Probing and Grouting Works at Zone 1J (RW-4), 27 PointsProbing and Grouting Works at Zone 1J (RW-4)
Probing and Grouting Works at Zone 1M (RW-2B), 11 Points
Probing and Grouting Works at Zone 2N, 176 Points
Inspection for Coordinates prior to start Cavity Probing at Zone-1J (RW-4), 27 points
Inspection for Coordinates prior to start Cavity Probing at Zone-1K (RW-3B & RW-4), 32 points
Inspection for Coordinates prior to start Cavity Probing at Zone-1M (RW-2B), 11 points
Inspection for Coordinates prior to start Cavity Probing at Zone-1L (RW-3A & 3B), 39 points
Existing level before & after removing / disposal, Quantity-14
Probing and Grouting Works at Zone 1K, 138 Points
Probing and Grouting Works at Zone 1A RW, 20 Points
Probing and Grouting Works at Zone 1A (RW) North Tower, 84 Points
Probing and Grouting Works at Zone 1M (RW-2B), 28 Points
Probing and Grouting Works at Zone 1N, 39 Points
Probing and Grouting Works at Zone 1P (RW-1B), 39 Points
Probing and Grouting Works at Zone 1A - North Tower, 44 Points
Probing and Grouting Works at Zone 1J- Pilocene Garden (86 Points)
Probing and Grouting Works at Zone 1M and 1L - Garden of Choices (110 Points)
Probing and Grouting Works at Zone 1P - MCPE TUNNEL (93 Points)
Probing and Grouting Works at Zone 1N-North Mosque (197 Points)
Inspection for Coordinates prior to start Cavity Probing at Zone-2M, 57 points
Inspection for Coordinates prior to start Cavity Probing at Zone-2N, 95 points
Mok up installation of conduit for CCTV System at boundary wall as per attached sketch dwg
Inspection for Coordinates prior to start Cavity Probing at Zone-1A (RW), 84 points
Inspection for Coordinates prior to start Cavity Probing at Zone-1P, 20 points
Inspection for Coordinates prior to start Cavity Probing at Zone-1K, 138 points
Installation of Mini PTP (MPTP-1), 1point
Inspection for Shuttering and Concrete Pouring of Column Neck - Crescent Traverse Point, 26 Points.
Inspection for "Mock-up of Copping" on Boundary Wall as per KAIG3-BO-A-0053-00, comments #4
Inspection for Coordinates prior to start Cavity Probing at Zone-1 (RW-2B), 28 points
Inspection for Coordinates prior to start Cavity Probing at Zone-1 (RW-2A), 39 points
Inspection for Coordinates prior to start Cavity Probing at Zone-1 (RW-1B), 39 points
Inspection for Coordinates prior to start Cavity Probing at Zone-1 (RW-1B), 44 points
Sub-base preparation and compaction for the area of "Rock & Boulder Stone" MOCK-UP.
Excavation for Investigation of Rock Surface at Zone-1, Gridline AO to AG
Installation of Stone Cladding for concrete Boundary Wall outer face (except column),wall span #14 - #1
Installation of Stone Cladding for concrete Boundary Wall outer face (except column),wall span #18.
Inspection for Shuttering and Concrete Pouring of Column Neck - Crescent Traverse Point, 26 Points.
Inspection for Coordinates prior to start Cavity Probing at Zone-1N, 197 points
Inspection for Coordinates prior to start Cavity Probing at Zone-2N, 82 points
Inspection for Coordinates prior to start Cavity Probing at Zone-2Q, 4 points
Inspection for Coordinates prior to start Cavity Probing at Zone-2R, 71 points
Probing and Grouting Works at Zone 2P (93 Points)
Probing and Grouting Works at Zone 1H (74 Points)
Inspection for Coordinates prior to start Cavity Probing at MCPE Tunnel, 93 Points
Subgrade preparation and compaction for the area of "Rock & Boulder Stone" MOCK-UP.
Inspection for Coordinates of "Rock & Boulder Stone" for MOCK-UP
Inspection for Coordinates prior to start Cavity Probing at Zone-1F, 104 Points
Inspection for Coordinates prior to start Cavity Probing at Zone-1G, 148 Points
Surface preparation for concrete Boundary Wall outer face, prior to install Riyadh Stone Cladding; Span
Probing and Grouting Works at Zone 2Q (245 Points)
Inspection for Coordinates prior to start Cavity Probing at Zone-2M, 227 Points
Inspection for Coordinates prior to start Cavity Probing at Zone-1H, 74 Points
Inspection for Coordinates prior to start Cavity Probing at Zone-2P, 44 Points
Project Banner installation as per Graphic Design.
Installation of 33-units Traverse Control Point (Main Traverse Point) with identification plate.
Inspection of soil sample collection from NGL in Zone-1, Crescent - Innerside, prior to start backfilling; Z
Erection of Steel Structure for Project Signboard.
Inspection for Coordinates prior to start Cavity Probing.
Top Rock level of Pile Cap, Zone-7 (Crescent Area)
Existing level of Water Garden - Boat Garden.
Existing level of Water Garden - Mist Garden.
Existing level of Water Garden - Water Play Garden.
Existing level of Water Garden - Geyser Garden.
Top Rock level of Pile Capl, Zone-6 (Crescent Area)
Probing and Grouting Works at Zone 2R (261 Points)
Probing and Grouting Works at Zone 1H (243 Points)
Excavation for Investigation of Rock Surface at Zone-1, Gridline 1/AO to 1/AS
Inspection for Coordinates prior to start Cavity Probing at Zone-2Q, 59 Points
Inspection for Coordinates prior to start Cavity Probing at Zone-2P, 46 Points
Inspection for Coordinates prior to start Cavity Probing at Zone-2R, 2 Points
Top Rock level of Pile Capl, Zone-5 (Crescent Area)
Top Rock level of Retaining Wall, Zone-1 (Crescent Area)
Rock level of Pile Cap Zone-3 (Crescent Area)
Top Rock level of Pile Cap at Zone-2 (Crescent Area)
Top Rock level of Pile Cap at Zone-1 (Crescent Area)
Concrete Pouring for Foundation of Traverse Point -Crescent (26 Pcs.)
Inspection for existing ground level of Zone-7 (Crescent Area) prior to start excavation; Grid lines 02 / J
Inspection for Coordinates prior to start Cavity Probing at Zone 2P, 34 points
Inspection for Coordinates prior to start Cavity Probing at Zone 2R, 98 points
Inspection for Coordinates prior to start Cavity Probing at Zone 2R, 98 points
Inspection for existing ground level of Zone-6 (Crescent Area) prior to start excavation; Grid lines 01/C - 02
Surface preparation prior to application of Primer for Structural Steel of Project Signboard.
Erection of Steel Structure for Project Signboard.
Painting of Steel Structure for Signboard (Primer and Top Coat)
Inspection for Coordinates prior to start Cavity Probing at Zone-2, Gridlines 02/2 to 02/AZ, 75 points
Probing and Grouting Works at Zone 1H (261 Points)
Inspection for Reinforcement of Grade Beam at Visitor's Center - Electrical Room.
Inspection for existing level of Zone-3 (Crescent Area) prior to start excavation. Grid lines 01/P-01/W &
Inspection of soil sample collection for "Soil Classification Test" in Zone-1 (Backfill Area / Crescent Area), pr
Inspection of reinforcement for foundation of "Visitor's Center" - Electrical Room.
Traverse Observation by Static Method with GPS.
Inspection for Coordinates prior to start Cavity Probing at Zone-1H, 98 points
Inspection for Steel reinforcement of Foundation - Crescent Traverse Point
Inspection of formworks for foundation of "Visitor's Center" - Electrical Room.
Inspection for Coordinates prior to start Cavity Probing at Zone-1H, 154 points
Inspection for Excavation of "Visitor's Center" - Electrical Room.
Installation of 33-units Traverse Control Point (Main Traverse Point) with identification plate.
Notification to start Excavation for Flatform at Zone-1.
Inspection for Concrete Pouring of Raft Foundation for Project Signboard.
Inspection for Shuttering and Reinforcement of Raft Foundation for Project Signboard.
Inspection for "Survey" - Checking Anchor Bolt and Plate level; concrete level point of Raft Foundation for
Painting of Steel Structure for Project Signboard
Concrete pouring inspection of founation for "Visitor's Center" - Electrical Room
Project Banner installation as per Graphic Design.
Inspection for Coordinates prior to start Cavity Probing at Zone-1J,200 points
Surface preparation for concrete Boundary Wall outer face, prior to install Riyadh Stone Cladding
Inspection for Site - Laboratory Layout and Equipment.
Existing Rock Level of Dividing Wall area.
Existing level and Rock level at Front Canopies of Crescent Area, Zone 1 and 5-6.
Inspection for existing level of Zone-1 & Zone-2 (Crescent Area) prior to start excavation. Grid lines 02
Inspection for existing level of Zone-3 (Crescent Area) prior to start excavation. Grid lines 01/P-01/W
Inspection for existing ground level of Zone-4 (Crescent Area). Grid lines 01/G - 01/P & 02/AB - 02/AL.
Top Rock level of Pile Cap, Zone-4 (Crescent Area)
Probing and Grouting Works at Zone 1J (200 Points)
Probing and Grouting Works at Zone 1K (193 Points)
Existing Level before and after Removing and Disposal at Zone-4 (Quantity-3)
Surface preparation for concrete Boundary Wall outer face, prior to install Riyadh Stone Cladding; wall s
Inspection for coordinates and level of foundation for "Visitor's Center" - Electrical Room.
Inspection for Coordinates prior to start Cavity Probing at Zone-1J,176 points
Existing level of Water Garden - Aviary Garden
Concrete Grouting for Cavity Probing – Zone – north Tower
Probing and Grouting Works at Zone 1M (12 Points)
Probing and Grouting Works at Zone 1L (208 Points)
Existing Level before and after Removing and Disposal at Zone-5 (Quantity-6)
Inspection for Coordinates prior to start Cavity Probing at Zone-1K,181 points
Concrete pouring for Blinding of "Crescent Traverse Point"
Opening of Control Joints for Boundary Wall at Span #4, 6 & 8.
Start surface preparation
Start surface preparation
Start surface preparation
Probing and Grouting Works at Zone 1M (105 Points)
Probing and Grouting Works at Zone 1M (141 Points)
Inspection for Coordinates prior to start Cavity Probing at Zone-1L, 220 points
Surface preparation for concrete Boundary Wall outer face, prior to install Riyadh Stone Cladding; wal
Installation of Stone Cladding for concrete Boundary Wall outer face,wall span #18.
Probing and Grouting Works at Zone 1P, (105 points)
Probing and Grouting Works at Zone 1R & 1Q, (66 points)
Probing and Grouting Works at Zone 1S North Tower; (46 points)
Existing level at Zone-6A and 6B
Probing and Grouting Works at Zone 1N (74 Points)
Inspection for Coordinates prior to start Cavity Probing (Zone-1N); 249 points
Probing and Grouting Works at Zone 1N (163 Points)
Existing level at Zone-5A t0 5D
Notification for surface preparation prior to start "Plastering Works" (Internal and External).
Notification for surface preparation prior to start "Plastering Works" (Internal & External).
Notification for Surface preparation prior to start "Block Works".
Inspection for Site - Laboratory Layout and Equipment.
Existing level at Zone 4C and 4D after removal, disposal of rejected materials (Quantity 5).
Probing and Grouting Works
Existing level at Zone-4
Inspection for Coordinates prior to start Cavity Probing.
Existing level of Retaining Wall at Crescent Zone-1.
Existing level at Zone 4C and 4D after removal, disposal of rejected materials (Quantity 5).
Surface preparation for concrete Boundary Wall Column outer face, prior to install Riyadh Stone Clad
Surface preparation for concrete Boundary Wall outer face, prior to install Riyadh Stone Cladding; wal
Existing Level of Maze Garden.
Existing Level of Zone 3A & 3B.
Existing Rock Level at Crescent -Retaining Wall area.
Existing Rock Level at Crescent -VIP Auditorium area.
Probing and Grouting for PTP's.
Survey for PTP's.
Existing level of Butterfly Garden.
Existing level of Discovery Garden
Surface preparation for concrete Boundary Wall outer face, prior to install Riyadh Stone Cladding; spa
Existing level of Valley Disposal (before removing)
Existing Level of Zone 2A & 2B
Inspection for Mock-up of Boundary Wall - Stone Cladding
Existing level of Zone 6A after removal / disposal of rejected material (Quantity 16)
Existing level of Picnic Area at Zone 1A, 1B, 1C and Zone 1D
Existing level of Culvert Area at Zone 3A and Zone 6A
Existing level of Zone 5C & 5D after removal / disposal of rejected material (Quantity 10)
BuildingType Discipline Inspection Date Received Date Code State
TG A 1/31/2023 1/30/2023 B - Approved as noted Answered
TT E 2/1/2023 1/31/2023 B - Approved as noted Answered
SW E 2/4/2023 In Progress
WG E 2/4/2023 In Progress
NA E 2/1/2023 1/31/2023 B - Approved as noted Answered
SW C 2/2/2023 In Progress
RD C 2/2/2023 In Progress
SW C 2/2/2023 In Progress
SW C 2/2/2023 In Progress
SW C 2/2/2023 In Progress
SW C 2/2/2023 In Progress
SW C 2/2/2023 In Progress
SW C 2/2/2023 In Progress
SW C 2/2/2023 In Progress
SW C 2/2/2023 In Progress
SW C 2/2/2023 In Progress
SW C 2/2/2023 In Progress
SW LS 2/2/2023 In Progress
SW LS 2/2/2023 In Progress
SW LS 2/2/2023 In Progress
SW LS 2/2/2023 In Progress
SW LS 2/2/2023 In Progress
SW LS 2/2/2023 In Progress
SW LS 2/2/2023 In Progress
SW LS 2/2/2023 In Progress
SW LS 2/2/2023 In Progress
SW LS 2/2/2023 In Progress
SW LS 2/2/2023 In Progress
SW LS 2/2/2023 In Progress
SW LS 2/2/2023 In Progress
SW C 2/4/2023 In Progress
SW LS 2/2/2023 In Progress
SW C 2/4/2023 In Progress
SW LS 2/2/2023 In Progress
SW LS 2/2/2023 In Progress
SW LS 2/2/2023 In Progress
SW LS 2/2/2023 In Progress
SW LS 2/2/2023 In Progress
SW LS 2/2/2023 In Progress
SW C 2/1/2023 In Progress
SW C 2/1/2023 In Progress
SW C 2/1/2023 In Progress
SW C 2/1/2023 In Progress
SW C 2/1/2023 In Progress
SW C 2/1/2023 In Progress
SW C 2/1/2023 In Progress
SW C 2/1/2023 In Progress
SW C 2/1/2023 In Progress
SW C 2/1/2023 In Progress
SW C 2/1/2023 1/31/2023 B - Approved as noted Answered
CC S 1/31/2023 1/30/2023 B - Approved as noted Answered
NA S 1/31/2023 1/30/2023 B - Approved as noted Answered
CF S 1/31/2023 1/30/2023 B - Approved as noted Answered
PC S 1/28/2023 1/26/2023 B - Approved as noted Answered
EC S 1/28/2023 1/26/2023 B - Approved as noted Answered
CO S 1/29/2023 1/26/2023 B - Approved as noted Answered
EC S 1/28/2023 1/26/2023 B - Approved as noted Answered
EC S 1/28/2023 1/26/2023 B - Approved as noted Answered
EC S 1/28/2023 1/26/2023 B - Approved as noted Answered
EC S 1/28/2023 1/26/2023 B - Approved as noted Answered
CO S 1/28/2023 1/26/2023 B - Approved as noted Answered
CO C 1/28/2023 1/26/2023 B - Approved as noted Answered
CO C 1/28/2023 1/26/2023 B - Approved as noted Answered
MC C 1/28/2023 1/26/2023 B - Approved as noted Answered
EC SU 1/28/2023 1/26/2023 B - Approved as noted Answered
EC SU 1/28/2023 1/26/2023 B - Approved as noted Answered
CO SU 1/29/2023 1/26/2023 B - Approved as noted Answered
EC SU 1/28/2023 1/26/2023 B - Approved as noted Answered
EC SU 1/28/2023 1/26/2023 B - Approved as noted Answered
MC SU 1/25/2023 1/24/2023 B - Approved as noted Answered
EC SS 1/25/2023 1/24/2023 B - Approved as noted Answered
WG C 2/5/2023 In Progress
WG C 2/5/2023 In Progress
WG C 2/5/2023 In Progress
PG C 2/5/2023 In Progress
CG C 1/26/2023 1/25/2023 B - Approved as noted Answered
CO C 1/26/2023 1/25/2023 B - Approved as noted Answered
CO C 1/26/2023 1/25/2023 B - Approved as noted Answered
WG C 2/4/2023 In Progress
TT S 2/4/2023 In Progress
MB S 2/4/2023 In Progress
AG S 2/4/2023 In Progress
TT SU 2/4/2023 In Progress
MB SU 2/4/2023 In Progress
AG SU 2/4/2023 In Progress
CO S 1/26/2023 1/25/2023 B - Approved as noted Answered
CF S 1/26/2023 1/25/2023 B - Approved as noted Answered
SW E 2/1/2023 In Progress
SW E 2/1/2023 1/31/2023 B - Approved as noted Answered
PG C 2/2/2023 2/1/2023 B - Approved as noted Answered
TB C 2/2/2023 In Progress
AG S 2/2/2023 In Progress
AG SU 2/2/2023 2/1/2023 B - Approved as noted Answered
SW E 2/1/2023 1/31/2023 B - Approved as noted Answered
TT S 2/2/2023 2/1/2023 B - Approved as noted Answered
TG C 2/2/2023 In Progress
PG C 2/2/2023 In Progress
WG C 2/2/2023 In Progress
DG LS 2/2/2023 In Progress
CF LC 2/2/2023 2/1/2023 B - Approved as noted Answered
SW LC 2/1/2023 1/31/2023 C - Revise & Resubmit Answered
SW LC 2/2/2023 1/31/2023 B - Approved as noted Answered
SW LC 2/2/2023 1/31/2023 C - Revise & Resubmit Answered
SW LC 2/1/2023 1/31/2023 C - Revise & Resubmit Answered
NA A 1/30/2023 1/29/2023 C - Revise & Resubmit Answered
CF SU 2/2/2023 In Progress
CO S 2/2/2023 In Progress
CO SU 2/2/2023 2/1/2023 B - Approved as noted Answered
CO S 2/2/2023 In Progress
CO S 2/2/2023 2/1/2023 B - Approved as noted Answered
CO C 2/2/2023 In Progress
PC SU 2/2/2023 In Progress
EC SU 2/2/2023 2/1/2023 B - Approved as noted Answered
EC S 2/2/2023 In Progress
EC SU 2/2/2023 2/1/2023 B - Approved as noted Answered
PG C 2/2/2023 In Progress
EC S 2/2/2023 In Progress
CO S 2/2/2023 2/1/2023 B - Approved as noted Answered
CO S 2/2/2023 In Progress
SW C 2/1/2023 1/31/2023 B - Approved as noted Answered
SW C 2/1/2023 1/31/2023 B - Approved as noted Answered
SW C 2/1/2023 In Progress
SW C 2/1/2023 1/31/2023 B - Approved as noted Answered
SW C 2/1/2023 1/31/2023 B - Approved as noted Answered
SW C 2/1/2023 1/31/2023 B - Approved as noted Answered
SW C 2/1/2023 1/31/2023 B - Approved as noted Answered
SW C 2/1/2023 1/31/2023 B - Approved as noted Answered
SW C 2/1/2023 1/31/2023 B - Approved as noted Answered
SW C 1/26/2023 1/25/2023 A - Approved Answered
SW C 1/28/2023 1/26/2023 C - Revise & Resubmit Answered
EC S 1/30/2023 1/29/2023 B - Approved as noted Answered
TT LC 1/31/2023 1/30/2023 B - Approved as noted Answered
TT LC 1/31/2023 1/30/2023 B - Approved as noted Answered
TT LC 1/31/2023 1/30/2023 B - Approved as noted Answered
FC LC 1/31/2023 1/30/2023 B - Approved as noted Answered
PT LC 1/31/2023 1/30/2023 B - Approved as noted Answered
NA LC 1/31/2023 1/30/2023 B - Approved as noted Answered
SW M 2/1/2023 1/31/2023 C - Revise & Resubmit Answered
SW P 2/1/2023 1/31/2023 B - Approved as noted Answered
CO A 1/30/2023 1/29/2023 B - Approved as noted Answered
CO A 1/30/2023 1/29/2023 B - Approved as noted Answered
CO A 1/30/2023 1/29/2023 B - Approved as noted Answered
CO A 1/30/2023 1/29/2023 B - Approved as noted Answered
CO S 2/1/2023 In Progress
CO S 2/1/2023 In Progress
CO S 2/1/2023 1/31/2023 B - Approved as noted Answered
CO S 2/1/2023 1/31/2023 B - Approved as noted Answered
CO S 2/1/2023 1/31/2023 B - Approved as noted Answered
CO SU 2/1/2023 1/31/2023 B - Approved as noted Answered
NA S 2/1/2023 In Progress
NA S 2/1/2023 In Progress
NA S 2/1/2023 In Progress
CO S 2/1/2023 1/31/2023 B - Approved as noted Answered
SA S 2/1/2023 1/31/2023 B - Approved as noted Answered
SA S 2/1/2023 1/31/2023 B - Approved as noted Answered
CO SU 1/26/2023 1/25/2023 B - Approved as noted Answered
SW E 1/31/2023 1/30/2023 B - Approved as noted Answered
SW E 1/31/2023 1/30/2023 C - Revise & Resubmit Answered
NA E 2/1/2023 1/30/2023 B - Approved as noted Answered
SW LC 1/29/2023 1/28/2023 B - Approved as noted Answered
SW LC 1/29/2023 1/28/2023 B - Approved as noted Answered
SW LC 1/29/2023 1/28/2023 B - Approved as noted Answered
SW LC 1/29/2023 1/28/2023 B - Approved as noted Answered
TB C 1/31/2023 1/30/2023 C - Revise & Resubmit Answered
WG C 1/31/2023 1/30/2023 B - Approved as noted Answered
WG C 1/31/2023 1/30/2023 B - Approved as noted Answered
WG C 1/31/2023 1/30/2023 B - Approved as noted Answered
WG S 1/31/2023 1/30/2023 B - Approved as noted Answered
WG S 1/31/2023 1/30/2023 B - Approved as noted Answered
SW LC 1/30/2023 1/29/2023 B - Approved as noted Answered
SW LC 1/30/2023 1/29/2023 B - Approved as noted Answered
SW LC 1/30/2023 1/29/2023 B - Approved as noted Answered
SW LC 1/29/2023 1/29/2023 B - Approved as noted Answered
SW LC 1/29/2023 1/29/2023 B - Approved as noted Answered
SW P 1/31/2023 1/30/2023 B - Approved as noted Answered
SW P 1/31/2023 1/30/2023 B - Approved as noted Answered
SW LS 1/31/2023 1/30/2023 B - Approved as noted Answered
SW C 1/31/2023 1/30/2023 B - Approved as noted Answered
SW C 1/31/2023 1/30/2023 B - Approved as noted Answered
SW C 1/31/2023 In Progress
SW C 1/31/2023 In Progress
SW C 1/31/2023 In Progress
SA SU 1/31/2023 1/30/2023 B - Approved as noted Answered
SA S 1/31/2023 1/30/2023 B - Approved as noted Answered
SW C 1/31/2023 1/30/2023 B - Approved as noted Answered
SW C 1/31/2023 1/30/2023 B - Approved as noted Answered
SW C 1/31/2023 In Progress
PG C 1/30/2023 1/29/2023 B - Approved as noted Answered
SW C 1/31/2023 1/30/2023 B - Approved as noted Answered
PG C 1/30/2023 1/29/2023 B - Approved as noted Answered
WG SU 1/30/2023 1/29/2023 B - Approved as noted Answered
SW C 1/31/2023 1/30/2023 B - Approved as noted Answered
WG SU 1/30/2023 1/29/2023 B - Approved as noted Answered
SW C 1/25/2023 1/24/2023 B - Approved as noted Answered
SW C 1/31/2023 In Progress
TT SU 1/30/2023 1/29/2023 B - Approved as noted Answered
TG S 1/30/2023 1/29/2023 B - Approved as noted Answered
TT S 1/30/2023 1/29/2023 B - Approved as noted Answered
AG S 1/30/2023 1/29/2023 B - Approved as noted Answered
SW C 1/30/2023 1/29/2023 B - Approved as noted Answered
SW C 1/30/2023 1/29/2023 B - Approved as noted Answered
SW C 1/30/2023 1/29/2023 B - Approved as noted Answered
SW C 1/30/2023 1/29/2023 B - Approved as noted Answered
SW C 1/30/2023 1/29/2023 B - Approved as noted Answered
SW C 1/30/2023 1/29/2023 B - Approved as noted Answered
SW C 1/30/2023 1/29/2023 B - Approved as noted Answered
SW C 1/30/2023 1/29/2023 B - Approved as noted Answered
SW C 1/30/2023 1/29/2023 C - Revise & Resubmit Answered
SW C 1/30/2023 1/29/2023 C - Revise & Resubmit Answered
SW C 1/30/2023 1/29/2023 C - Revise & Resubmit Answered
SW C 1/30/2023 1/29/2023 B - Approved as noted Answered
SW C 1/30/2023 1/29/2023 B - Approved as noted Answered
SW C 1/30/2023 1/29/2023 B - Approved as noted Answered
SW C 1/30/2023 1/29/2023 B - Approved as noted Answered
SW C 1/30/2023 1/29/2023 B - Approved as noted Answered
SW C 1/30/2023 In Progress
SW C 1/30/2023 1/29/2023 B - Approved as noted Answered
RD C 1/30/2023 1/29/2023 B - Approved as noted Answered
PA C 1/30/2023 1/29/2023 B - Approved as noted Answered
PA C 1/30/2023 1/29/2023 B - Approved as noted Answered
CC E 1/29/2023 1/28/2023 B - Approved as noted Answered
CC E 1/29/2023 1/28/2023 B - Approved as noted Answered
SW LC 1/30/2023 1/29/2023 B - Approved as noted Answered
SW LC 1/30/2023 1/29/2023 B - Approved as noted Answered
SW LC 1/30/2023 1/29/2023 B - Approved as noted Answered
SW LC 1/30/2023 1/29/2023 B - Approved as noted Answered
SW E 1/30/2023 1/29/2023 B - Approved as noted Answered
SW E 1/30/2023 1/29/2023 B - Approved as noted Answered
SW E 1/30/2023 1/29/2023 B - Approved as noted Answered
CC SS 1/30/2023 1/29/2023 B - Approved as noted Answered
CO C 1/30/2023 1/29/2023 B - Approved as noted Answered
CO S 1/30/2023 1/29/2023 B - Approved as noted Answered
CO S 1/30/2023 1/29/2023 B - Approved as noted Answered
CO S 1/30/2023 1/29/2023 B - Approved as noted Answered
CO S 1/30/2023 1/29/2023 B - Approved as noted Answered
CO S 1/30/2023 1/29/2023 B - Approved as noted Answered
CO S 1/30/2023 1/29/2023 B - Approved as noted Answered
MC C 1/30/2023 In Progress
MC C 1/30/2023 1/29/2023 B - Approved as noted Answered
SW M 1/30/2023 1/29/2023 B - Approved as noted Answered
SW M 1/30/2023 1/29/2023 B - Approved as noted Answered
SW C 1/30/2023 1/29/2023 B - Approved as noted Answered
SW C 1/30/2023 1/29/2023 B - Approved as noted Answered
SW C 1/30/2023 1/29/2023 B - Approved as noted Answered
SW C 1/30/2023 1/29/2023 B - Approved as noted Answered
SW C 1/30/2023 1/29/2023 C - Revise & Resubmit Answered
SW C 1/30/2023 1/29/2023 B - Approved as noted Answered
SW C 1/30/2023 1/29/2023 B - Approved as noted Answered
SW C 1/30/2023 1/29/2023 B - Approved as noted Answered
SW C 1/30/2023 1/29/2023 C - Revise & Resubmit Answered
SW C 1/30/2023 1/29/2023 B - Approved as noted Answered
CO SU 1/30/2023 1/29/2023 B - Approved as noted Answered
CO S 1/30/2023 1/29/2023 B - Approved as noted Answered
CO SU 1/30/2023 1/29/2023 B - Approved as noted Answered
CO S 1/30/2023 1/29/2023 B - Approved as noted Answered
CO S 1/30/2023 1/29/2023 B - Approved as noted Answered
CO S 1/30/2023 1/29/2023 B - Approved as noted Answered
CO S 1/30/2023 1/29/2023 B - Approved as noted Answered
CO S 1/30/2023 1/29/2023 B - Approved as noted Answered
CO S 1/30/2023 1/29/2023 B - Approved as noted Answered
CO S 1/30/2023 1/29/2023 B - Approved as noted Answered
SW C 1/28/2023 1/26/2023 B - Approved as noted Answered
SW C 1/18/2023 1/17/2023 B - Approved as noted Answered
SW C 1/18/2023 1/17/2023 B - Approved as noted Answered
MC SU 1/23/2023 1/22/2023 B - Approved as noted Answered
GC LC 1/28/2023 1/26/2023 B - Approved as noted Answered
GC LC 1/28/2023 1/26/2023 B - Approved as noted Answered
SA LC 1/28/2023 1/26/2023 B - Approved as noted Answered
DG C 1/30/2023 1/28/2023 B - Approved as noted Answered
PG C 1/29/2023 1/28/2023 B - Approved as noted Answered
FC A 1/29/2023 1/28/2023 B - Approved as noted Answered
TG S 1/29/2023 1/28/2023 B - Approved as noted Answered
SW C 1/29/2023 In Progress
SW C 1/29/2023 1/28/2023 B - Approved as noted Answered
SW C 1/29/2023 1/28/2023 B - Approved as noted Answered
SW C 1/29/2023 1/28/2023 B - Approved as noted Answered
SW C 1/29/2023 1/28/2023 B - Approved as noted Answered
SW C 1/29/2023 1/28/2023 B - Approved as noted Answered
SW LS 1/29/2023 1/28/2023 B - Approved as noted Answered
SW C 1/28/2023 1/26/2023 B - Approved as noted Answered
SW C 1/28/2023 1/26/2023 B - Approved as noted Answered
SW LS 1/28/2023 1/26/2023 B - Approved as noted Answered
SA S 1/28/2023 1/26/2023 B - Approved as noted Answered
CO S 1/28/2023 1/26/2023 B - Approved as noted Answered
PC SU 1/29/2023 1/28/2023 B - Approved as noted Answered
CO SU 1/29/2023 1/28/2023 B - Approved as noted Answered
CO C 1/29/2023 In Progress
PC S 1/29/2023 1/28/2023 B - Approved as noted Answered
CO S 1/29/2023 1/28/2023 B - Approved as noted Answered
CO S 1/29/2023 1/28/2023 B - Approved as noted Answered
CF S 1/29/2023 1/28/2023 B - Approved as noted Answered
CO S 1/29/2023 1/28/2023 B - Approved as noted Answered
CO S 1/29/2023 1/28/2023 B - Approved as noted Answered
NA S 1/29/2023 1/28/2023 B - Approved as noted Answered
PC S 1/29/2023 1/28/2023 C - Revise & Resubmit Answered
EC S 1/26/2023 1/24/2023 B - Approved as noted Answered
MC C 1/17/2023 1/16/2023 B - Approved as noted Answered
TT S 1/28/2023 1/26/2023 B - Approved as noted Answered
PG C 1/28/2023 1/26/2023 B - Approved as noted Answered
TG C 1/28/2023 1/26/2023 B - Approved as noted Answered
WG C 1/28/2023 1/26/2023 B - Approved as noted Answered
DG C 1/28/2023 1/26/2023 B - Approved as noted Answered
TB C 1/28/2023 In Progress
SW C 1/25/2023 1/24/2023 B - Approved as noted Answered
SW C 1/25/2023 1/24/2023 B - Approved as noted Answered
MC SU 1/28/2023 1/26/2023 B - Approved as noted Answered
TB C 1/28/2023 In Progress
MC S 1/28/2023 1/26/2023 B - Approved as noted Answered
MC S 1/28/2023 1/26/2023 B - Approved as noted Answered
CO SU 1/28/2023 1/26/2023 B - Approved as noted Answered
CO S 1/28/2023 1/26/2023 B - Approved as noted Answered
CO S 1/28/2023 1/26/2023 B - Approved as noted Answered
CO S 1/28/2023 1/26/2023 B - Approved as noted Answered
TB C 1/26/2023 1/25/2023 B - Approved as noted Answered
TB C 1/26/2023 1/25/2023 B - Approved as noted Answered
TB C 1/26/2023 1/25/2023 B - Approved as noted Answered
WG LS 1/26/2023 1/25/2023 B - Approved as noted Answered
TG S 1/26/2023 1/25/2023 B - Approved as noted Answered
TG SU 1/26/2023 1/25/2023 B - Approved as noted Answered
SW C 1/28/2023 In Progress
SW C 1/28/2023 1/26/2023 B - Approved as noted Answered
SW C 1/28/2023 1/26/2023 B - Approved as noted Answered
SW C 1/28/2023 1/26/2023 B - Approved as noted Answered
SW C 1/28/2023 1/26/2023 B - Approved as noted Answered
SW LS 1/28/2023 1/26/2023 B - Approved as noted Answered
SW LS 1/28/2023 1/26/2023 B - Approved as noted Answered
SW LS 1/28/2023 1/26/2023 B - Approved as noted Answered
SW LS 1/28/2023 1/26/2023 B - Approved as noted Answered
SW LS 1/28/2023 1/26/2023 B - Approved as noted Answered
SW LS 1/28/2023 1/26/2023 B - Approved as noted Answered
SW E 1/26/2023 1/25/2023 B - Approved as noted Answered
NA E 1/26/2023 1/25/2023 B - Approved as noted Answered
NA LC 1/26/2023 1/25/2023 B - Approved as noted Answered
SW C 1/26/2023 1/25/2023 B - Approved as noted Answered
SW C 1/26/2023 1/25/2023 B - Approved as noted Answered
SW C 1/26/2023 1/25/2023 B - Approved as noted Answered
SW C 1/26/2023 1/25/2023 B - Approved as noted Answered
SW C 1/26/2023 1/25/2023 B - Approved as noted Answered
SW C 1/25/2023 1/24/2023 B - Approved as noted Answered
SW C 1/26/2023 1/25/2023 B - Approved as noted Answered
SW C 1/26/2023 1/25/2023 B - Approved as noted Answered
SW C 1/26/2023 1/25/2023 B - Approved as noted Answered
SW C 1/26/2023 1/25/2023 C - Revise & Resubmit Answered
SW C 1/25/2023 1/24/2023 B - Approved as noted Answered
CO S 1/17/2023 1/16/2023 B - Approved as noted Answered
NA P 1/26/2023 1/25/2023 B - Approved as noted Answered
SW LS 1/26/2023 1/25/2023 C - Revise & Resubmit Answered
SW LS 1/26/2023 1/25/2023 B - Approved as noted Answered
SW LS 1/29/2023 1/25/2023 B - Approved as noted Answered
TG LS 1/26/2023 1/25/2023 B - Approved as noted Answered
PG LC 1/24/2023 1/23/2023 B - Approved as noted Answered
MC S 1/26/2023 1/25/2023 B - Approved as noted Answered
EC SU 1/26/2023 1/25/2023 B - Approved as noted Answered
EC S 1/26/2023 1/25/2023 B - Approved as noted Answered
CC SU 1/26/2023 1/25/2023 B - Approved as noted Answered
CC S 1/26/2023 1/25/2023 B - Approved as noted Answered
SW E 1/25/2023 1/24/2023 B - Approved as noted Answered
WG C 1/25/2023 In Progress
WG C 1/25/2023 1/24/2023 B - Approved as noted Answered
RD C 1/25/2023 1/24/2023 C - Revise & Resubmit Answered
SW C 1/25/2023 1/24/2023 B - Approved as noted Answered
SW C 1/25/2023 1/24/2023 B - Approved as noted Answered
SW C 1/25/2023 1/24/2023 B - Approved as noted Answered
SW C 1/25/2023 1/24/2023 B - Approved as noted Answered
SW C 1/25/2023 1/24/2023 B - Approved as noted Answered
SW C 1/25/2023 1/24/2023 B - Approved as noted Answered
SW C 1/25/2023 1/24/2023 B - Approved as noted Answered
SW C 1/25/2023 1/24/2023 B - Approved as noted Answered
SW C 1/25/2023 1/24/2023 B - Approved as noted Answered
SW C 1/25/2023 1/24/2023 B - Approved as noted Answered
SW C 1/25/2023 1/24/2023 B - Approved as noted Answered
SW C 1/25/2023 1/24/2023 B - Approved as noted Answered
SW C 1/25/2023 1/24/2023 B - Approved as noted Answered
SW C 1/25/2023 1/24/2023 B - Approved as noted Answered
PG C 1/25/2023 1/24/2023 B - Approved as noted Answered
SW C 1/25/2023 1/24/2023 B - Approved as noted Answered
SW C 1/25/2023 1/24/2023 B - Approved as noted Answered
SW C 1/25/2023 1/24/2023 B - Approved as noted Answered
SW C 1/25/2023 1/24/2023 B - Approved as noted Answered
SW C 1/25/2023 1/24/2023 B - Approved as noted Answered
SW C 1/25/2023 1/24/2023 B - Approved as noted Answered
SW C 1/26/2023 1/25/2023 B - Approved as noted Answered
SW LS 1/25/2023 1/24/2023 B - Approved as noted Answered
PG C 1/25/2023 1/24/2023 B - Approved as noted Answered
WG LS 1/25/2023 1/24/2023 B - Approved as noted Answered
WG LS 1/25/2023 1/24/2023 B - Approved as noted Answered
TG A 1/25/2023 1/24/2023 B - Approved as noted Answered
AG S 1/25/2023 1/24/2023 B - Approved as noted Answered
TG S 1/26/2023 1/24/2023 B - Approved as noted Answered
TG S 1/25/2023 1/24/2023 B - Approved as noted Answered
TG S 1/25/2023 1/24/2023 B - Approved as noted Answered
MB S 1/25/2023 1/24/2023 C - Revise & Resubmit Answered
CO S 1/25/2023 1/24/2023 B - Approved as noted Answered
SW C 1/24/2023 1/23/2023 B - Approved as noted Answered
SW C 1/23/2023 1/23/2023 B - Approved as noted Answered
SW C 1/25/2023 1/24/2023 B - Approved as noted Answered
SW C 1/25/2023 1/24/2023 B - Approved as noted Answered
CO A 1/23/2023 1/24/2023 B - Approved as noted Answered
NA S 1/25/2023 1/24/2023 B - Approved as noted Answered
CO A 1/25/2023 1/24/2023 B - Approved as noted Answered
CO A 1/23/2023 1/23/2023 B - Approved as noted Answered
MC S 1/25/2023 1/24/2023 B - Approved as noted Answered
MC S 1/25/2023 1/24/2023 B - Approved as noted Answered
CO A 1/23/2023 1/22/2023 B - Approved as noted Answered
SA SU 1/25/2023 1/24/2023 B - Approved as noted Answered
SA S 1/25/2023 1/24/2023 B - Approved as noted Answered
SA S 1/25/2023 1/24/2023 B - Approved as noted Answered
CO A 1/23/2023 1/23/2023 B - Approved as noted Answered
EC SU 1/25/2023 1/24/2023 B - Approved as noted Answered
CO A 1/23/2023 1/22/2023 B - Approved as noted Answered
CO A 1/23/2023 1/22/2023 B - Approved as noted Answered
EC S 1/25/2023 1/24/2023 B - Approved as noted Answered
EC S 1/25/2023 1/24/2023 B - Approved as noted Answered
CO SU 1/25/2023 1/24/2023 B - Approved as noted Answered
CO SU 1/25/2023 1/24/2023 B - Approved as noted Answered
CO S 1/25/2023 1/24/2023 B - Approved as noted Answered
CO S 1/25/2023 1/24/2023 B - Approved as noted Answered
CO S 1/25/2023 1/24/2023 B - Approved as noted Answered
CO S 1/25/2023 1/24/2023 B - Approved as noted Answered
CO S 1/25/2023 1/24/2023 B - Approved as noted Answered
SW M 1/25/2023 1/24/2023 B - Approved as noted Answered
SW M 1/25/2023 1/24/2023 B - Approved as noted Answered
CO S 1/25/2023 1/24/2023 B - Approved as noted Answered
CO SU 1/23/2023 1/22/2023 B - Approved as noted Answered
NA S 1/22/2023 1/21/2023 B - Approved as noted Answered
SW C 1/24/2023 1/23/2023 B - Approved as noted Answered
SW C 1/24/2023 1/23/2023 B - Approved as noted Answered
SW C 1/24/2023 1/23/2023 B - Approved as noted Answered
SW C 1/24/2023 1/23/2023 B - Approved as noted Answered
SW C 1/24/2023 1/23/2023 B - Approved as noted Answered
SW C 1/24/2023 1/23/2023 B - Approved as noted Answered
SW C 1/24/2023 1/23/2023 C - Revise & Resubmit Answered
SW C 1/24/2023 1/23/2023 B - Approved as noted Answered
SW C 1/24/2023 2/23/2023 B - Approved as noted Answered
SW C 1/24/2023 1/23/2023 B - Approved as noted Answered
SW C 1/24/2023 1/23/2023 B - Approved as noted Answered
SW C 1/24/2023 1/23/2023 B - Approved as noted Answered
SW C 1/23/2023 1/23/2023 B - Approved as noted Answered
CO S 1/14/2023 1/12/2023 B - Approved as noted Answered
SW P 1/23/2023 1/22/2023 B - Approved as noted Answered
SW P 1/23/2023 1/22/2023 B - Approved as noted Answered
SW P 1/23/2023 1/22/2023 B - Approved as noted Answered
SW P 1/23/2023 1/22/2023 B - Approved as noted Answered
SW C 1/15/2023 1/14/2023 B - Approved as noted Answered
WG SU 1/24/2023 1/23/2023 B - Approved as noted Answered
WG SU 1/24/2023 1/23/2023 C - Revise & Resubmit Answered
WG SU 1/24/2023 1/23/2023 C - Revise & Resubmit Answered
PG C 1/24/2023 1/23/2023 B - Approved as noted Answered
TG C 1/24/2023 1/23/2023 B - Approved as noted Answered
WG C 1/24/2023 1/23/2023 B - Approved as noted Answered
WG C 1/24/2023 In Progress
FC E 1/23/2023 1/22/2023 B - Approved as noted Answered
WG C 1/24/2023 1/23/2023 B - Approved as noted Answered
WG C 1/24/2023 1/23/2023 C - Revise & Resubmit Answered
WG C 1/24/2023 1/23/2023 C - Revise & Resubmit Answered
TT LC 1/24/2023 1/23/2023 B - Approved as noted Answered
WG C 1/24/2023 1/23/2023 C - Revise & Resubmit Answered
TT LC 1/24/2023 1/23/2023 B - Approved as noted Answered
TT LC 1/24/2023 1/23/2023 B - Approved as noted Answered
WG C 1/24/2023 1/23/2023 C - Revise & Resubmit Answered
TT A 1/23/2023 1/22/2023 B - Approved as noted Answered
AG LS 1/23/2023 1/22/2023 B - Approved as noted Answered
PG LS 1/23/2023 1/22/2023 B - Approved as noted Answered
WG C 1/24/2023 1/23/2023 B - Approved as noted Answered
SA SU 1/16/2023 1/16/2023 B - Approved as noted Answered
PG C 1/24/2023 1/23/2023 B - Approved as noted Answered
PG C 1/24/2023 1/23/2023 B - Approved as noted Answered
SA S 1/18/2023 1/17/2023 B - Approved as noted Answered
SW M 1/24/2023 1/23/2023 B - Approved as noted Answered
CG LC 1/24/2023 1/23/2023 B - Approved as noted Answered
RG LC 1/24/2023 1/23/2023 B - Approved as noted Answered
WG C 1/23/2023 1/22/2023 B - Approved as noted Answered
DG C 1/23/2023 1/22/2023 B - Approved as noted Answered
WG C 1/23/2023 1/22/2023 B - Approved as noted Answered
WG S 1/23/2023 1/22/2023 B - Approved as noted Answered
WG S 1/23/2023 1/22/2023 B - Approved as noted Answered
WG S 1/23/2023 1/22/2023 B - Approved as noted Answered
PG S 1/23/2023 1/22/2023 B - Approved as noted Answered
PG S 1/25/2023 1/22/2023 B - Approved as noted Answered
TT S 1/26/2023 1/22/2023 C - Revise & Resubmit Answered
TT SU 1/23/2023 1/22/2023 B - Approved as noted Answered
PC E 1/23/2023 1/22/2023 B - Approved as noted Answered
PC LC 1/23/2023 1/22/2023 B - Approved as noted Answered
GC LC 1/23/2023 1/22/2023 B - Approved as noted Answered
NA LC 1/23/2023 1/22/2023 B - Approved as noted Answered
SA LC 1/23/2023 1/22/2023 B - Approved as noted Answered
NA SU 1/22/2023 1/21/2023 B - Approved as noted Answered
CO SU 1/24/2023 1/23/2023 B - Approved as noted Answered
CO SU 1/22/2023 1/21/2023 B - Approved as noted Answered
CO S 1/24/2023 1/23/2023 B - Approved as noted Answered
CO S 1/24/2023 1/23/2023 B - Approved as noted Answered
CO S 1/24/2023 1/23/2023 B - Approved as noted Answered
NA S 1/14/2023 1/12/2023 B - Approved as noted Answered
NA S 1/14/2023 1/12/2023 B - Approved as noted Answered
NA S 1/14/2023 1/12/2023 B - Approved as noted Answered
CO SU 1/24/2023 1/23/2023 B - Approved as noted Answered
CO SU 1/24/2023 1/23/2023 B - Approved as noted Answered
CO SU 1/25/2023 1/24/2023 B - Approved as noted Answered
CO S 1/24/2023 1/23/2023 B - Approved as noted Answered
CO S 1/24/2023 1/23/2023 B - Approved as noted Answered
CO S 1/24/2023 1/23/2023 B - Approved as noted Answered
CO S 1/24/2023 1/23/2023 B - Approved as noted Answered
CO S 1/24/2023 1/23/2023 B - Approved as noted Answered
CO S 1/24/2023 1/23/2023 B - Approved as noted Answered
CO S 1/24/2023 1/23/2023 B - Approved as noted Answered
CO S 1/24/2023 1/23/2023 B - Approved as noted Answered
CO C 1/24/2023 1/23/2023 C - Revise & Resubmit Answered
CG C 1/24/2023 1/23/2023 B - Approved as noted Answered
CO SU 1/22/2023 1/21/2023 B - Approved as noted Answered
CO SU 1/22/2023 1/21/2023 B - Approved as noted Answered
EC S 1/22/2023 1/21/2023 B - Approved as noted Answered
SA P 1/14/2023 1/12/2023 B - Approved as noted Answered
CG C 1/22/2023 1/21/2023 B - Approved as noted Answered
SW M 1/23/2023 1/22/2023 B - Approved as noted Answered
SW M 1/23/2023 1/22/2023 B - Approved as noted Answered
SW M 1/23/2023 1/22/2023 B - Approved as noted Answered
CO S 1/23/2023 1/22/2023 B - Approved as noted Answered
SA S 1/14/2023 1/12/2023 B - Approved as noted Answered
SW C 1/23/2023 1/22/2023 B - Approved as noted Answered
SW LS 1/23/2023 1/22/2023 B - Approved as noted Answered
SW C 1/23/2023 1/22/2023 B - Approved as noted Answered
CC P 1/23/2023 1/22/2023 B - Approved as noted Answered
PG A 1/22/2023 1/21/2023 B - Approved as noted Answered
TB C 1/22/2023 1/1/2023 B - Approved as noted Answered
SW C 1/23/2023 1/22/2023 B - Approved as noted Answered
SW C 1/23/2023 1/22/2023 B - Approved as noted Answered
SW LS 1/23/2023 1/22/2023 B - Approved as noted Answered
SW LS 1/23/2023 1/22/2023 B - Approved as noted Answered
SW LS 1/23/2023 1/22/2023 B - Approved as noted Answered
NA LC 1/21/2023 1/19/2023 B - Approved as noted Answered
SW C 1/23/2023 1/22/2023 B - Approved as noted Answered
SW C 1/23/2023 1/22/2023 B - Approved as noted Answered
SW C 1/23/2023 1/22/2023 B - Approved as noted Answered
CO SU 1/23/2023 1/22/2023 B - Approved as noted Answered
SW C 1/23/2023 1/22/2023 B - Approved as noted Answered
CO S 1/23/2023 1/22/2023 B - Approved as noted Answered
TT E 1/18/2023 1/17/2023 B - Approved as noted Answered
CO S 1/23/2023 1/22/2023 B - Approved as noted Answered
SW C 1/23/2023 1/22/2023 B - Approved as noted Answered
MC S 1/23/2023 1/22/2023 C - Revise & Resubmit Answered
SW C 1/23/2023 1/22/2023 B - Approved as noted Answered
MC S 1/23/2023 1/22/2023 B - Approved as noted Answered
MC S 1/23/2023 1/22/2023 B - Approved as noted Answered
SW C 1/23/2023 1/22/2023 B - Approved as noted Answered
SW E 1/21/2023 1/19/2023 B - Approved as noted Answered
EC S 1/23/2023 1/22/2023 B - Approved as noted Answered
SW C 1/23/2023 1/22/2023 B - Approved as noted Answered
SW E 1/21/2023 1/19/2023 B - Approved as noted Answered
SW C 1/23/2023 1/22/2023 B - Approved as noted Answered
SW C 1/23/2023 1/22/2023 B - Approved as noted Answered
CO S 1/23/2023 1/22/2023 B - Approved as noted Answered
SW C 1/23/2023 1/22/2023 B - Approved as noted Answered
CO C 1/23/2023 1/22/2023 B - Approved as noted Answered
CO C 1/23/2023 1/22/2023 B - Approved as noted Answered
SW C 1/23/2023 1/22/2023 B - Approved as noted Answered
CG C 1/23/2023 1/22/2023 C - Revise & Resubmit Answered
SW C 1/23/2023 1/22/2023 B - Approved as noted Answered
SW LS 1/23/2023 1/16/2023 B - Approved as noted Answered
TG A 1/15/2023 1/14/2023 C - Revise & Resubmit Answered
SW C 1/22/2023 1/21/2023 B - Approved as noted Answered
SW C 1/22/2023 1/21/2023 B - Approved as noted Answered
CO S 1/14/2023 1/12/2023 B - Approved as noted Answered
SW E 1/21/2023 1/19/2023 B - Approved as noted Answered
CF E 1/21/2023 1/19/2023 B - Approved as noted Answered
SW E 1/21/2023 1/19/2023 B - Approved as noted Answered
SW E 1/21/2023 1/19/2023 B - Approved as noted Answered
CF LC 1/19/2023 1/18/2023 B - Approved as noted Answered
CF LC 1/19/2023 1/18/2023 B - Approved as noted Answered
CF LC 1/19/2023 1/18/2023 B - Approved as noted Answered
CO A 1/22/2023 1/21/2023 C - Revise & Resubmit Answered
CO A 1/22/2023 1/21/2023 C - Revise & Resubmit Answered
CO A 1/22/2023 1/21/2023 C - Revise & Resubmit Answered
CO S 1/22/2023 1/21/2023 B - Approved as noted Answered
CO S 1/22/2023 1/21/2023 B - Approved as noted Answered
CO S 1/22/2023 1/21/2023 B - Approved as noted Answered
CO S 1/22/2023 1/21/2023 B - Approved as noted Answered
CO S 1/22/2023 1/21/2023 B - Approved as noted Answered
CO S 1/22/2023 1/21/2023 B - Approved as noted Answered
CO S 1/22/2023 1/21/2023 B - Approved as noted Answered
CO A 1/19/2023 1/19/2023 B - Approved as noted Answered
CO A 1/21/2023 1/19/2023 B - Approved as noted Answered
CO A 1/19/2023 1/18/2023 B - Approved as noted Answered
CO A 1/19/2023 1/18/2023 C - Revise & Resubmit Answered
CO A 1/19/2023 1/18/2023 B - Approved as noted Answered
CO A 1/19/2023 1/18/2023 B - Approved as noted Answered
CO A 1/19/2023 1/18/2023 B - Approved as noted Answered
CO A 1/19/2023 1/18/2023 B - Approved as noted Answered
CO A 1/19/2023 1/18/2023 C - Revise & Resubmit Answered
WG LS 1/21/2023 1/19/2023 B - Approved as noted Answered
WG LS 1/21/2023 1/19/2023 B - Approved as noted Answered
SW LS 1/21/2023 1/19/2023 B - Approved as noted Answered
SW C 1/21/2023 1/19/2023 B - Approved as noted Answered
SW C 1/21/2023 1/19/2023 B - Approved as noted Answered
SW C 1/21/2023 1/19/2023 B - Approved as noted Answered
SW C 1/21/2023 1/19/2023 B - Approved as noted Answered
SW C 1/21/2023 1/19/2023 B - Approved as noted Answered
SW C 1/21/2023 1/19/2023 B - Approved as noted Answered
SW C 1/21/2023 1/19/2023 B - Approved as noted Answered
SW C 1/21/2023 1/19/2023 B - Approved as noted Answered
SW C 1/21/2023 1/19/2023 B - Approved as noted Answered
SW C 1/21/2023 1/19/2023 B - Approved as noted Answered
SW LS 1/21/2023 1/19/2023 B - Approved as noted Answered
TG S 1/21/2023 1/19/2023 B - Approved as noted Answered
PG S 1/21/2023 1/19/2023 B - Approved as noted Answered
PG S 1/21/2023 1/19/2023 B - Approved as noted Answered
PG S 1/21/2023 1/19/2023 C - Revise & Resubmit Answered
DG S 1/21/2023 1/19/2023 B - Approved as noted Answered
TG A 1/21/2023 1/19/2023 B - Approved as noted Answered
TG A 1/21/2023 1/19/2023 B - Approved as noted Answered
WG C 1/21/2023 1/19/2023 B - Approved as noted Answered
TT C 1/21/2023 1/19/2023 B - Approved as noted Answered
FC LC 1/18/2023 1/17/2023 B - Approved as noted Answered
MC SU 1/21/2023 1/19/2023 B - Approved as noted Answered
PC S 1/21/2023 1/19/2023 B - Approved as noted Answered
PC S 1/21/2023 1/19/2023 B - Approved as noted Answered
MC S 1/21/2023 1/19/2023 B - Approved as noted Answered
MC S 1/21/2023 1/19/2023 B - Approved as noted Answered
MC S 1/21/2023 1/19/2023 B - Approved as noted Answered
EC SU 1/21/2023 1/19/2023 B - Approved as noted Answered
CO SU 1/21/2023 1/19/2023 C - Revise & Resubmit Answered
CO S 1/21/2023 1/19/2023 B - Approved as noted Answered
CO S 1/21/2023 1/19/2023 B - Approved as noted Answered
CC M 1/22/2023 1/19/2023 B - Approved as noted Answered
CO S 1/21/2023 1/19/2023 B - Approved as noted Answered
CO S 1/21/2023 1/19/2023 B - Approved as noted Answered
CO S 1/21/2023 1/19/2023 B - Approved as noted Answered
CO S 1/12/2023 1/11/2023 B - Approved as noted Answered
CO C 1/21/2023 1/19/2023 C - Revise & Resubmit Answered
CO A 1/21/2023 1/19/2023 B - Approved as noted Answered
CO A 1/21/2023 1/19/2023 B - Approved as noted Answered
CO A 1/21/2023 1/19/2023 B - Approved as noted Answered
CG C 1/21/2023 1/19/2023 B - Approved as noted Answered
CF SU 1/21/2023 1/19/2023 B - Approved as noted Answered
CF SU 1/21/2023 1/19/2023 B - Approved as noted Answered
CF S 1/21/2023 1/19/2023 B - Approved as noted Answered
CF S 1/24/2023 1/19/2023 B - Approved as noted Answered
TT S 1/19/2023 1/18/2023 B - Approved as noted Answered
PG E 1/21/2023 1/19/2023 C - Revise & Resubmit Answered
TT SU 1/19/2023 1/18/2023 B - Approved as noted Answered
AG SU 1/19/2023 1/18/2023 B - Approved as noted Answered
PG C 1/19/2023 1/18/2023 B - Approved as noted Answered
PG C 1/19/2023 1/18/2023 B - Approved as noted Answered
SA LC 1/17/2023 1/16/2023 B - Approved as noted Answered
EC E 1/19/2023 1/18/2023 B - Approved as noted Answered
SW E 1/19/2023 1/18/2023 B - Approved as noted Answered
SW E 1/18/2023 1/17/2023 B - Approved as noted Answered
SA E 1/18/2023 1/17/2023 B - Approved as noted Answered
NA SU 1/14/2023 1/12/2023 B - Approved as noted Answered
PG A 1/19/2023 1/18/2023 C - Revise & Resubmit Answered
EC S 1/12/2023 1/11/2023 B - Approved as noted Answered
SW C 1/19/2023 1/18/2023 B - Approved as noted Answered
RD C 1/19/2023 1/18/2023 B - Approved as noted Answered
SA A 1/14/2023 1/12/2023 B - Approved as noted Answered
EC S 1/19/2023 1/18/2023 B - Approved as noted Answered
SW C 1/19/2023 1/18/2023 B - Approved as noted Answered
SW C 1/19/2023 1/18/2023 B - Approved as noted Answered
SW C 1/19/2023 1/18/2023 B - Approved as noted Answered
CO A 1/9/2023 1/8/2023 B - Approved as noted Answered
SA SU 1/19/2023 1/18/2023 B - Approved as noted Answered
SW C 1/19/2023 1/18/2023 B - Approved as noted Answered
SA S 1/19/2023 1/18/2023 B - Approved as noted Answered
SW C 1/19/2023 1/18/2023 B - Approved as noted Answered
SA C 1/19/2023 1/18/2023 B - Approved as noted Answered
SW C 1/19/2023 1/18/2023 B - Approved as noted Answered
MC S 1/19/2023 1/18/2023 B - Approved as noted Answered
SW C 1/19/2023 1/18/2023 B - Approved as noted Answered
MC C 1/19/2023 1/18/2023 B - Approved as noted Answered
CO SU 1/19/2023 1/18/2023 B - Approved as noted Answered
CO SU 1/19/2023 1/18/2023 B - Approved as noted Answered
CO S 1/19/2023 1/18/2023 B - Approved as noted Answered
SW C 1/19/2023 1/18/2023 B - Approved as noted Answered
CO S 1/19/2023 1/18/2023 B - Approved as noted Answered
CO S 1/19/2023 1/18/2023 B - Approved as noted Answered
SW C 1/19/2023 1/18/2023 B - Approved as noted Answered
CO S 1/19/2023 1/18/2023 B - Approved as noted Answered
CO S 1/19/2023 1/18/2023 B - Approved as noted Answered
SW C 1/19/2023 1/18/2023 B - Approved as noted Answered
CO S 1/19/2023 1/18/2023 B - Approved as noted Answered
CO E 1/9/2023 1/8/2023 B - Approved as noted Answered
CO C 1/19/2023 1/18/2023 B - Approved as noted Answered
SW C 1/19/2023 1/18/2023 B - Approved as noted Answered
CF S 1/19/2023 1/18/2023 B - Approved as noted Answered
SW C 1/19/2023 1/18/2023 B - Approved as noted Answered
CO E 1/9/2023 1/8/2023 B - Approved as noted Answered
SW C 1/19/2023 1/18/2023 B - Approved as noted Answered
SW C 1/19/2023 1/18/2023 B - Approved as noted Answered
SW C 1/19/2023 1/18/2023 B - Approved as noted Answered
SW C 1/19/2023 1/18/2023 B - Approved as noted Answered
SW C 1/19/2023 1/18/2023 B - Approved as noted Answered
SW LS 1/19/2023 1/18/2023 B - Approved as noted Answered
SW M 1/19/2023 1/18/2023 B - Approved as noted Answered
SW C 1/19/2023 1/18/2023 B - Approved as noted Answered
SW C 1/19/2023 1/18/2023 B - Approved as noted Answered
WG C 1/19/2023 1/18/2023 B - Approved as noted Answered
PG LS 1/19/2023 1/18/2023 B - Approved as noted Answered
SA S 1/10/2023 1/9/2023 B - Approved as noted Answered
WG LS 1/21/2023 1/18/2023 B - Approved as noted Answered
CO S 1/9/2023 1/8/2023 B - Approved as noted Answered
CC S 11/23/2022 11/22/2022 B - Approved as noted Answered
SM S 12/26/2022 12/25/2022 C - Revise & Resubmit Answered
SW C 1/3/2023 1/2/2023 B - Approved as noted Answered
CC S 1/10/2023 1/9/2023 B - Approved as noted Answered
MB SU 1/18/2023 1/17/2023 C - Revise & Resubmit Answered
PG LS 1/21/2023 1/17/2023 B - Approved as noted Answered
PG LS 1/18/2023 1/17/2023 B - Approved as noted Answered
TG C 1/18/2023 1/17/2023 B - Approved as noted Answered
PG C 1/18/2023 1/17/2023 B - Approved as noted Answered
PG C 1/18/2023 1/17/2023 B - Approved as noted Answered
PG C 1/19/2023 1/17/2023 B - Approved as noted Answered
PG C 1/18/2023 1/17/2023 B - Approved as noted Answered
TG C 1/18/2023 1/17/2023 B - Approved as noted Answered
TB S 1/18/2023 1/17/2023 B - Approved as noted Answered
TB S 1/18/2023 1/19/2023 B - Approved as noted Answered
SW C 1/15/2023 1/14/2023 B - Approved as noted Answered
SW C 1/15/2023 1/14/2023 B - Approved as noted Answered
SW LS 1/15/2023 1/14/2023 B - Approved as noted Answered
SW C 1/18/2023 1/17/2023 B - Approved as noted Answered
SW C 1/18/2023 1/17/2023 B - Approved as noted Answered
SW C 1/18/2023 1/17/2023 B - Approved as noted Answered
SW C 1/18/2023 1/17/2023 B - Approved as noted Answered
SW C 1/18/2023 1/17/2023 B - Approved as noted Answered
SW C 1/18/2023 1/17/2023 B - Approved as noted Answered
SW C 1/18/2023 1/17/2023 B - Approved as noted Answered
SW C 1/18/2023 1/17/2023 B - Approved as noted Answered
SW C 1/18/2023 1/17/2023 B - Approved as noted Answered
SW C 1/18/2023 1/17/2023 B - Approved as noted Answered
SW C 1/18/2023 1/17/2023 B - Approved as noted Answered
SW C 1/18/2023 1/17/2023 B - Approved as noted Answered
SW C 1/18/2023 1/17/2023 B - Approved as noted Answered
SW C 1/18/2023 1/17/2023 B - Approved as noted Answered
SW C 1/18/2023 1/17/2023 B - Approved as noted Answered
SW C 1/18/2023 1/17/2023 B - Approved as noted Answered
SW C 1/18/2023 1/17/2023 B - Approved as noted Answered
SW C 1/18/2023 1/17/2023 C - Revise & Resubmit Answered
SW C 1/18/2023 1/17/2023 B - Approved as noted Answered
SW C 1/18/2023 1/17/2023 B - Approved as noted Answered
SW C 1/18/2023 1/17/2023 B - Approved as noted Answered
SW C 1/18/2023 1/17/2023 B - Approved as noted Answered
SW C 1/18/2023 1/17/2023 B - Approved as noted Answered
SW C 1/18/2023 1/17/2023 B - Approved as noted Answered
CO S 1/18/2023 1/17/2023 B - Approved as noted Answered
CO S 1/18/2023 1/17/2023 B - Approved as noted Answered
CO S 1/18/2023 1/17/2023 B - Approved as noted Answered
EC S 1/18/2023 1/17/2023 B - Approved as noted Answered
CG C 1/18/2023 1/17/2023 C - Revise & Resubmit Answered
NG C 1/18/2023 1/17/2023 B - Approved as noted Answered
CG C 1/18/2023 1/17/2023 B - Approved as noted Answered
CO S 1/18/2023 1/17/2023 B - Approved as noted Answered
CO S 1/18/2023 1/17/2023 B - Approved as noted Answered
CO S 1/18/2023 1/17/2023 B - Approved as noted Answered
CO SS 1/18/2023 1/17/2023 B - Approved as noted Answered
CO SU 1/18/2023 1/17/2023 B - Approved as noted Answered
CO S 1/18/2023 1/17/2023 B - Approved as noted Answered
CO S 1/18/2023 1/17/2023 B - Approved as noted Answered
CO SU 1/18/2023 1/17/2023 B - Approved as noted Answered
CO S 1/18/2023 1/17/2023 B - Approved as noted Answered
SW M 1/18/2023 1/17/2023 B - Approved as noted Answered
NA S 1/18/2023 1/17/2023 B - Approved as noted Answered
SW C 1/17/2023 1/16/2023 B - Approved as noted Answered
SW C 1/17/2023 1/16/2023 B - Approved as noted Answered
SW C 1/17/2023 1/16/2023 B - Approved as noted Answered
SW C 1/17/2023 1/16/2023 B - Approved as noted Answered
SW C 1/17/2023 1/16/2023 B - Approved as noted Answered
SW C 1/17/2023 1/16/2023 B - Approved as noted Answered
SW LS 1/23/2023 1/16/2023 B - Approved as noted Answered
SW C 1/17/2023 1/16/2023 B - Approved as noted Answered
SW C 1/17/2023 1/16/2023 B - Approved as noted Answered
SW C 1/17/2023 1/16/2023 B - Approved as noted Answered
SW C 1/17/2023 1/16/2023 B - Approved as noted Answered
SW C 1/17/2023 1/16/2023 B - Approved as noted Answered
SW C 1/17/2023 1/16/2023 B - Approved as noted Answered
SW C 1/17/2023 1/16/2023 B - Approved as noted Answered
TT C 1/17/2023 1/16/2023 B - Approved as noted Answered
PG C 1/17/2023 1/16/2023 B - Approved as noted Answered
PG C 1/17/2023 1/16/2023 B - Approved as noted Answered
WG C 1/17/2023 1/16/2023 B - Approved as noted Answered
TG C 1/17/2023 1/16/2023 B - Approved as noted Answered
WG LS 1/17/2023 1/16/2023 B - Approved as noted Answered
DG LS 1/17/2023 1/16/2023 B - Approved as noted Answered
PG A 1/17/2023 1/16/2023 C - Revise & Resubmit Answered
SW LC 1/17/2023 1/16/2023 B - Approved as noted Answered
SW LC 1/17/2023 1/16/2023 B - Approved as noted Answered
CO S 1/17/2023 1/16/2023 B - Approved as noted Answered
CO C 1/17/2023 1/16/2023 B - Approved as noted Answered
NA SU 1/17/2023 1/16/2023 B - Approved as noted Answered
CF S 1/18/2023 1/16/2023 B - Approved as noted Answered
CO S 1/17/2023 1/16/2023 B - Approved as noted Answered
CO S 1/17/2023 1/16/2023 B - Approved as noted Answered
NA S 1/17/2023 1/16/2023 B - Approved as noted Answered
NA S 1/17/2023 1/16/2023 B - Approved as noted Answered
NA S 1/17/2023 1/16/2023 B - Approved as noted Answered
NA S 1/17/2023 1/16/2023 B - Approved as noted Answered
CF S 1/18/2023 1/16/2023 B - Approved as noted Answered
PC S 1/17/2023 1/19/2023 B - Approved as noted Answered
NA S 1/17/2023 1/12/2023 B - Approved as noted Answered
CO S 1/17/2023 1/16/2023 B - Approved as noted Answered
SA C 1/17/2023 1/16/2023 B - Approved as noted Answered
WG C 1/17/2023 1/16/2023 B - Approved as noted Answered
WG C 1/17/2023 1/16/2023 B - Approved as noted Answered
TG LS 1/17/2023 1/16/2023 B - Approved as noted Answered
CC P 1/17/2023 1/16/2023 B - Approved as noted Answered
CO SU 1/16/2023 1/15/2023 B - Approved as noted Answered
CO SU 1/16/2023 1/15/2023 B - Approved as noted Answered
CO SU 1/16/2023 1/15/2023 B - Approved as noted Answered
CG C 1/17/2023 1/16/2023 B - Approved as noted Answered
NG C 1/16/2023 1/15/2023 B - Approved as noted Answered
CO S 1/16/2023 1/15/2023 B - Approved as noted Answered
CO S 1/16/2023 1/15/2023 B - Approved as noted Answered
CO S 1/16/2023 1/15/2023 B - Approved as noted Answered
CO S 1/16/2023 1/15/2023 B - Approved as noted Answered
SW C 1/16/2023 1/15/2023 B - Approved as noted Answered
CO S 1/16/2023 1/15/2023 B - Approved as noted Answered
SW C 1/16/2023 1/15/2023 B - Approved as noted Answered
PC S 1/16/2023 1/15/2023 B - Approved as noted Answered
SW C 1/16/2023 1/15/2023 B - Approved as noted Answered
SW C 1/16/2023 1/15/2023 B - Approved as noted Answered
SW C 1/16/2023 1/15/2023 B - Approved as noted Answered
CO S 1/16/2023 1/15/2023 B - Approved as noted Answered
SW C 1/16/2023 1/15/2023 B - Approved as noted Answered
SW C 1/16/2023 1/15/2023 B - Approved as noted Answered
SA C 1/16/2023 1/15/2023 B - Approved as noted Answered
SW C 1/16/2023 1/15/2023 B - Approved as noted Answered
SA C 1/16/2023 1/15/2023 B - Approved as noted Answered
SW C 1/16/2023 1/15/2023 B - Approved as noted Answered
SW C 1/16/2023 1/15/2023 B - Approved as noted Answered
CO A 1/16/2023 1/15/2023 B - Approved as noted Answered
SW C 1/16/2023 1/15/2023 B - Approved as noted Answered
SW C 1/16/2023 1/15/2023 B - Approved as noted Answered
SW A 1/16/2023 1/15/2023 C - Revise & Resubmit Answered
CO A 1/16/2023 1/15/2023 B - Approved as noted Answered
SW C 1/16/2023 1/15/2023 B - Approved as noted Answered
SW A 1/16/2023 1/15/2023 B - Approved as noted Answered
CO S 1/16/2023 1/15/2023 B - Approved as noted Answered
CO S 1/16/2023 1/15/2023 B - Approved as noted Answered
PG S 1/16/2023 1/15/2023 B - Approved as noted Answered
CO S 1/16/2023 1/15/2023 B - Approved as noted Answered
PG S 1/16/2023 1/15/2023 B - Approved as noted Answered
CO SU 1/15/2023 1/14/2023 B - Approved as noted Answered
CO S 1/15/2023 1/14/2023 B - Approved as noted Answered
CO S 1/15/2023 1/14/2023 B - Approved as noted Answered
CO S 1/15/2023 1/14/2023 B - Approved as noted Answered
CC S 1/15/2023 1/14/2023 B - Approved as noted Answered
EC S 1/15/2023 1/14/2023 C - Revise & Resubmit Answered
CO S 1/15/2023 1/14/2023 B - Approved as noted Answered
CC S 1/15/2023 1/14/2023 B - Approved as noted Answered
CO S 1/15/2023 1/14/2023 B - Approved as noted Answered
CO C 1/11/2023 1/10/2023 C - Revise & Resubmit Answered
SA LC 1/16/2023 1/15/2023 B - Approved as noted Answered
SA LC 1/16/2023 1/15/2023 B - Approved as noted Answered
CG E 1/16/2023 1/15/2023 B - Approved as noted Answered
CG E 1/16/2023 1/15/2023 B - Approved as noted Answered
SA E 1/16/2023 1/15/2023 B - Approved as noted Answered
SA E 1/16/2023 1/15/2023 B - Approved as noted Answered
SA E 1/14/2023 1/12/2023 B - Approved as noted Answered
SA E 1/14/2023 1/12/2023 B - Approved as noted Answered
MB P 1/16/2023 1/15/2023 B - Approved as noted Answered
SA P 1/16/2023 1/15/2023 B - Approved as noted Answered
SW M 1/16/2023 1/15/2023 B - Approved as noted Answered
WG LS 1/15/2023 1/14/2023 B - Approved as noted Answered
WG LS 1/15/2023 1/14/2023 B - Approved as noted Answered
WG LS 1/15/2023 1/14/2023 B - Approved as noted Answered
CO C 1/14/2023 1/12/2023 B - Approved as noted Answered
TG A 1/15/2023 1/14/2023 C - Revise & Resubmit Answered
PG C 1/15/2023 1/14/2023 B - Approved as noted Answered
CG LC 1/15/2023 1/14/2023 B - Approved as noted Answered
FC LC 1/12/2023 1/11/2023 B - Approved as noted Answered
SW C 1/12/2023 1/11/2023 B - Approved as noted Answered
SW LS 1/15/2023 1/14/2023 B - Approved as noted Answered
SW LS 1/15/2023 1/14/2023 B - Approved as noted Answered
SW C 1/15/2023 1/14/2023 B - Approved as noted Answered
SW C 1/15/2023 1/14/2023 B - Approved as noted Answered
SW C 1/15/2023 1/14/2023 C - Revise & Resubmit Answered
SW C 1/15/2023 1/14/2023 B - Approved as noted Answered
FC LC 1/12/2023 1/11/2023 B - Approved as noted Answered
SW C 1/15/2023 1/14/2023 C - Revise & Resubmit Answered
SW C 1/15/2023 1/14/2023 B - Approved as noted Answered
SW C 1/15/2023 1/14/2023 B - Approved as noted Answered
PA C 1/15/2023 1/14/2023 B - Approved as noted Answered
PA C 1/15/2023 1/14/2023 B - Approved as noted Answered
SW C 1/14/2023 1/12/2023 C - Revise & Resubmit Answered
SW C 1/14/2023 1/12/2023 B - Approved as noted Answered
SW C 1/14/2023 1/12/2023 C - Revise & Resubmit Answered
SW C 1/14/2023 1/12/2023 C - Revise & Resubmit Answered
SW C 1/14/2023 1/12/2023 B - Approved as noted Answered
SW C 1/14/2023 1/12/2023 B - Approved as noted Answered
SW C 1/14/2023 1/12/2023 B - Approved as noted Answered
SW C 1/14/2023 1/12/2023 B - Approved as noted Answered
SW C 1/14/2023 1/12/2023 C - Revise & Resubmit Answered
SW C 1/14/2023 1/12/2023 C - Revise & Resubmit Answered
SW C 1/14/2023 1/12/2023 C - Revise & Resubmit Answered
SW C 1/14/2023 1/12/2023 C - Revise & Resubmit Answered
SW C 1/14/2023 1/12/2023 C - Revise & Resubmit Answered
SW C 1/14/2023 1/12/2023 C - Revise & Resubmit Answered
SW C 1/14/2023 1/14/2023 B - Approved as noted Answered
SW C 1/14/2023 1/12/2023 B - Approved as noted Answered
SW C 1/14/2023 1/12/2023 B - Approved as noted Answered
SW C 1/14/2023 1/12/2023 B - Approved as noted Answered
SW C 1/14/2023 1/12/2023 B - Approved as noted Answered
SW C 1/14/2023 1/12/2023 B - Approved as noted Answered
SW C 1/14/2023 1/12/2023 B - Approved as noted Answered
SW LS 1/14/2023 1/12/2023 B - Approved as noted Answered
PC S 1/14/2023 1/12/2023 C - Revise & Resubmit Answered
PC S 1/14/2023 1/12/2023 C - Revise & Resubmit Answered
NA SU 1/14/2023 1/12/2023 B - Approved as noted Answered
NA SU 1/14/2023 1/12/2023 B - Approved as noted Answered
NA S 1/14/2023 1/12/2023 B - Approved as noted Answered
NA S 1/14/2023 1/12/2023 C - Revise & Resubmit Answered
NA S 1/14/2023 1/12/2023 B - Approved as noted Answered
NA S 1/14/2023 1/12/2023 B - Approved as noted Answered
MC S 1/14/2023 1/12/2023 B - Approved as noted Answered
MC S 1/14/2023 1/12/2023 B - Approved as noted Answered
MC S 1/14/2023 1/12/2023 B - Approved as noted Answered
EC S 1/14/2023 1/12/2023 B - Approved as noted Answered
CO SU 1/14/2023 1/12/2023 B - Approved as noted Answered
CO SU 1/14/2023 1/12/2023 B - Approved as noted Answered
CO SU 1/14/2023 1/12/2023 B - Approved as noted Answered
CO S 1/14/2023 1/12/2023 B - Approved as noted Answered
CO S 1/14/2023 1/12/2023 B - Approved as noted Answered
CO S 1/14/2023 1/12/2023 B - Approved as noted Answered
CO S 1/14/2023 1/12/2023 C - Revise & Resubmit Answered
PC S 1/12/2023 1/11/2023 B - Approved as noted Answered
CO S 1/14/2023 1/12/2023 B - Approved as noted Answered
PC S 1/12/2023 1/11/2023 B - Approved as noted Answered
CO S 1/14/2023 1/12/2023 B - Approved as noted Answered
PC S 1/12/2023 1/11/2023 B - Approved as noted Answered
CO A 1/14/2023 1/12/2023 B - Approved as noted Answered
CO A 1/14/2023 1/12/2023 B - Approved as noted Answered
PC S 1/12/2023 1/11/2023 B - Approved as noted Answered
CO A 1/14/2023 1/12/2023 B - Approved as noted Answered
CC SU 1/14/2023 1/12/2023 B - Approved as noted Answered
DG SU 1/14/2023 1/12/2023 B - Approved as noted Answered
WG C 1/14/2023 1/12/2023 C - Revise & Resubmit Answered
WG C 1/14/2023 1/12/2023 C - Revise & Resubmit Answered
DG S 1/14/2023 1/12/2023 C - Revise & Resubmit Answered
DG S 1/14/2023 1/12/2023 B - Approved as noted Answered
PC SU 1/12/2023 1/11/2023 B - Approved as noted Answered
PC SU 1/12/2023 1/11/2023 B - Approved as noted Answered
CO SU 1/12/2023 1/11/2023 B - Approved as noted Answered
CO SU 1/12/2023 1/11/2023 B - Approved as noted Answered
PG S 1/14/2023 1/12/2023 C - Revise & Resubmit Answered
CC SU 1/12/2023 1/11/2023 B - Approved as noted Answered
CO SU 1/12/2023 1/11/2023 B - Approved as noted Answered
NA SU 1/12/2023 1/11/2023 B - Approved as noted Answered
PC SU 1/12/2023 1/11/2023 B - Approved as noted Answered
NA S 1/12/2023 1/11/2023 B - Approved as noted Answered
CO S 1/12/2023 1/11/2023 B - Approved as noted Answered
CO S 1/12/2023 1/11/2023 B - Approved as noted Answered
NA S 1/12/2023 1/11/2023 B - Approved as noted Answered
NA S 1/12/2023 1/11/2023 B - Approved as noted Answered
CO S 1/12/2023 1/11/2023 B - Approved as noted Answered
CO S 1/12/2023 1/11/2023 B - Approved as noted Answered
CO S 1/12/2023 1/11/2023 B - Approved as noted Answered
CC S 1/12/2023 1/11/2023 B - Approved as noted Answered
CO S 1/12/2023 1/11/2023 B - Approved as noted Answered
CO S 1/12/2023 1/11/2023 B - Approved as noted Answered
CO S 1/12/2023 1/11/2023 B - Approved as noted Answered
CO S 1/12/2023 1/11/2023 B - Approved as noted Answered
CC S 1/12/2023 1/11/2023 B - Approved as noted Answered
CC S 1/12/2023 1/11/2023 B - Approved as noted Answered
PC S 1/12/2023 1/11/2023 B - Approved as noted Answered
PC S 1/12/2023 1/11/2023 B - Approved as noted Answered
CC S 1/12/2023 1/11/2023 B - Approved as noted Answered
CC S 1/12/2023 1/11/2023 B - Approved as noted Answered
PC S 1/12/2023 1/11/2023 B - Approved as noted Answered
PC S 1/12/2023 1/11/2023 B - Approved as noted Answered
CO S 12/26/2022 10/25/2022 B - Approved as noted Answered
CO S 12/31/2022 12/29/2022 B - Approved as noted Answered
SA S 1/7/2023 1/5/2023 B - Approved as noted Answered
EC A 1/7/2023 1/5/2023 B - Approved as noted Answered
EC A 1/7/2023 1/5/2023 B - Approved as noted Answered
EC A 1/7/2023 1/5/2023 B - Approved as noted Answered
SW E 1/21/2023 1/19/2023 C - Revise & Resubmit Answered
SW E 1/14/2023 1/12/2023 C - Revise & Resubmit Answered
SW LC 1/12/2023 1/11/2023 C - Revise & Resubmit Answered
SW LC 1/12/2023 1/11/2023 C - Revise & Resubmit Answered
SW LC 1/12/2023 1/11/2023 C - Revise & Resubmit Answered
SW LC 1/12/2023 1/11/2023 C - Revise & Resubmit Answered
TG LC 1/12/2023 1/11/2023 B - Approved as noted Answered
SW A 1/12/2023 1/11/2023 B - Approved as noted Answered
WG C 1/12/2023 1/11/2023 B - Approved as noted Answered
WG LS 1/12/2023 1/11/2023 B - Approved as noted Answered
WG LS 1/15/2023 1/11/2023 B - Approved as noted Answered
WG LS 1/15/2023 1/11/2023 B - Approved as noted Answered
TB S 1/12/2023 1/11/2023 C - Revise & Resubmit Answered
TT S 1/12/2023 1/11/2023 B - Approved as noted Answered
AG S 1/12/2023 1/11/2023 B - Approved as noted Answered
SW E 1/12/2023 1/11/2023 B - Approved as noted Answered
SW E 1/12/2023 1/11/2023 B - Approved as noted Answered
SW E 1/11/2023 1/10/2023 C - Revise & Resubmit Answered
SW E 1/11/2023 1/10/2023 B - Approved as noted Answered
SW E 1/10/2023 1/9/2023 C - Revise & Resubmit Answered
SW E 1/10/2023 1/9/2023 B - Approved as noted Answered
TB E 1/10/2023 1/9/2023 B - Approved as noted Answered
SW LS 1/12/2023 1/11/2023 B - Approved as noted Answered
SW C 1/12/2023 1/11/2023 B - Approved as noted Answered
SW C 1/12/2023 1/11/2023 B - Approved as noted Answered
SW C 1/12/2023 1/11/2023 B - Approved as noted Answered
SW C 1/12/2023 1/11/2023 B - Approved as noted Answered
SW C 1/12/2023 1/11/2023 B - Approved as noted Answered
SW C 1/12/2023 1/11/2023 B - Approved as noted Answered
SW C 1/12/2023 1/11/2023 B - Approved as noted Answered
SW C 1/12/2023 1/11/2023 C - Revise & Resubmit Answered
SW C 1/12/2023 1/11/2023 B - Approved as noted Answered
SW C 1/12/2023 1/11/2023 B - Approved as noted Answered
SW C 1/12/2023 1/11/2023 B - Approved as noted Answered
SW C 1/12/2023 1/11/2023 B - Approved as noted Answered
SW C 1/12/2023 1/11/2023 B - Approved as noted Answered
SW C 1/12/2023 1/11/2023 B - Approved as noted Answered
SW C 1/16/2023 1/11/2023 C - Revise & Resubmit Answered
SW C 1/12/2023 1/11/2023 B - Approved as noted Answered
SW C 1/12/2023 1/11/2023 B - Approved as noted Answered
SW C 1/12/2023 1/11/2023 B - Approved as noted Answered
SW C 1/12/2023 1/11/2023 B - Approved as noted Answered
SW C 1/12/2023 1/11/2023 B - Approved as noted Answered
SW C 1/12/2023 1/11/2023 B - Approved as noted Answered
PA C 1/12/2023 1/11/2023 B - Approved as noted Answered
PA C 1/12/2023 1/11/2023 B - Approved as noted Answered
TG SU 1/11/2023 1/10/2023 B - Approved as noted Answered
TB SU 1/11/2023 1/10/2023 B - Approved as noted Answered
TG S 1/11/2023 1/10/2023 B - Approved as noted Answered
TG S 1/11/2023 1/10/2023 B - Approved as noted Answered
TB S 1/11/2023 1/10/2023 B - Approved as noted Answered
AG S 1/11/2023 1/10/2023 B - Approved as noted Answered
PG S 1/11/2023 1/10/2023 B - Approved as noted Answered
TB S 1/12/2023 1/10/2023 B - Approved as noted Answered
TB S 1/11/2023 1/10/2023 B - Approved as noted Answered
TB S 1/11/2023 1/10/2023 B - Approved as noted Answered
TG C 1/11/2023 1/10/2023 B - Approved as noted Answered
SW LS 1/12/2023 1/11/2023 A - Approved Answered
TG C 1/12/2023 1/11/2023 B - Approved as noted Answered
TG C 1/11/2023 1/10/2023 C - Revise & Resubmit Answered
SW C 1/12/2023 1/11/2023 B - Approved as noted Answered
MC C 1/11/2023 1/10/2023 B - Approved as noted Answered
CO C 1/11/2023 1/10/2023 B - Approved as noted Answered
CO C 1/11/2023 1/10/2023 B - Approved as noted Answered
MC SU 1/11/2023 1/10/2023 B - Approved as noted Answered
NA SU 1/11/2023 1/10/2023 C - Revise & Resubmit Answered
EC SU 1/11/2023 1/10/2023 B - Approved as noted Answered
CO SU 1/11/2023 1/10/2023 B - Approved as noted Answered
CO SU 1/11/2023 1/10/2023 B - Approved as noted Answered
MC S 1/11/2023 1/10/2023 B - Approved as noted Answered
CO S 1/11/2023 1/10/2023 B - Approved as noted Answered
MC S 1/11/2023 1/10/2023 B - Approved as noted Answered
MC S 1/11/2023 1/10/2023 B - Approved as noted Answered
NA S 1/11/2023 1/10/2023 B - Approved as noted Answered
EC S 1/11/2023 1/10/2023 B - Approved as noted Answered
EC S 1/11/2023 1/10/2023 B - Approved as noted Answered
CO S 1/11/2023 1/10/2023 B - Approved as noted Answered
NA S 1/11/2023 1/10/2023 B - Approved as noted Answered
CO S 1/11/2023 1/10/2023 B - Approved as noted Answered
CO S 1/11/2023 1/10/2023 B - Approved as noted Answered
CO S 1/11/2023 1/10/2023 B - Approved as noted Answered
CO S 1/11/2023 1/10/2023 B - Approved as noted Answered
CO S 1/11/2023 1/10/2023 B - Approved as noted Answered
SW LC 1/10/2023 1/9/2023 C - Revise & Resubmit Answered
SW LC 1/10/2023 1/9/2023 C - Revise & Resubmit Answered
PG LC 1/11/2023 1/9/2023 B - Approved as noted Answered
TG LC 1/9/2023 1/8/2023 C - Revise & Resubmit Answered
TG LC 1/9/2023 1/8/2023 C - Revise & Resubmit Answered
TG LC 1/9/2023 1/8/2023 C - Revise & Resubmit Answered
FC E 1/9/2023 1/8/2023 B - Approved as noted Answered
CO C 1/10/2023 1/9/2023 B - Approved as noted Answered
CO A 1/10/2023 1/9/2023 B - Approved as noted Answered
CO A 1/10/2023 1/9/2023 B - Approved as noted Answered
CO A 1/10/2023 1/9/2023 B - Approved as noted Answered
CO SU 1/10/2023 1/9/2023 B - Approved as noted Answered
CO SU 1/10/2023 1/9/2023 B - Approved as noted Answered
SA SU 1/10/2023 1/9/2023 B - Approved as noted Answered
CC SU 1/10/2023 1/9/2023 B - Approved as noted Answered
MC SU 1/10/2023 1/9/2023 B - Approved as noted Answered
CO S 1/10/2023 1/9/2023 C - Revise & Resubmit Answered
CO S 1/10/2023 1/9/2023 B - Approved as noted Answered
CO S 1/10/2023 1/9/2023 B - Approved as noted Answered
CO S 1/10/2023 1/9/2023 B - Approved as noted Answered
CC S 1/10/2023 1/9/2023 B - Approved as noted Answered
MC S 1/10/2023 1/9/2023 B - Approved as noted Answered
MC S 1/10/2023 1/9/2023 B - Approved as noted Answered
CF S 1/10/2023 1/9/2023 B - Approved as noted Answered
CO C 1/9/2023 1/8/2023 B - Approved as noted Answered
MC C 1/9/2023 1/8/2023 B - Approved as noted Answered
CO C 1/9/2023 1/8/2023 B - Approved as noted Answered
CO SU 1/9/2023 1/8/2023 B - Approved as noted Answered
CO SU 1/9/2023 1/8/2023 B - Approved as noted Answered
SW C 1/11/2023 1/10/2023 B - Approved as noted Answered
CC SU 1/9/2023 1/8/2023 B - Approved as noted Answered
SW C 1/11/2023 1/10/2023 B - Approved as noted Answered
SW C 1/11/2023 1/10/2023 B - Approved as noted Answered
CO SU 1/9/2023 1/8/2023 B - Approved as noted Answered
SW C 1/11/2023 1/10/2023 B - Approved as noted Answered
SW C 1/11/2023 1/10/2023 C - Revise & Resubmit Answered
SW C 1/17/2023 1/10/2023 B - Approved as noted Answered
SW C 1/11/2023 1/10/2023 B - Approved as noted Answered
SW C 1/11/2023 1/10/2023 B - Approved as noted Answered
SW C 1/11/2023 1/10/2023 B - Approved as noted Answered
SW C 1/11/2023 1/10/2023 B - Approved as noted Answered
SW C 1/11/2023 1/10/2023 B - Approved as noted Answered
SW C 1/11/2023 1/10/2023 B - Approved as noted Answered
SW C 1/11/2023 1/10/2023 B - Approved as noted Answered
PC SU 1/8/2023 1/7/2023 B - Approved as noted Answered
CO SU 1/8/2023 1/7/2023 B - Approved as noted Answered
CO S 1/9/2023 1/8/2023 B - Approved as noted Answered
CO S 1/9/2023 1/8/2023 B - Approved as noted Answered
CO S 1/9/2023 1/8/2023 B - Approved as noted Answered
CO S 1/9/2023 1/8/2023 B - Approved as noted Answered
SW LS 1/10/2023 1/9/2023 B - Approved as noted Answered
SW C 1/10/2023 1/9/2023 B - Approved as noted Answered
CC S 1/9/2023 1/8/2023 B - Approved as noted Answered
SW C 1/10/2023 1/9/2023 B - Approved as noted Answered
SW C 1/10/2023 1/9/2023 B - Approved as noted Answered
SW C 1/10/2023 1/9/2023 B - Approved as noted Answered
CO S 1/9/2023 1/8/2023 B - Approved as noted Answered
SW C 1/10/2023 1/9/2023 B - Approved as noted Answered
SW C 1/10/2023 1/9/2023 B - Approved as noted Answered
SW C 1/10/2023 1/9/2023 B - Approved as noted Answered
MC S 1/9/2023 1/8/2023 B - Approved as noted Answered
SW C 1/10/2023 1/9/2023 B - Approved as noted Answered
SW C 1/10/2023 1/9/2023 B - Approved as noted Answered
SW C 1/10/2023 1/9/2023 B - Approved as noted Answered
SW C 1/10/2023 1/9/2023 B - Approved as noted Answered
SW C 1/10/2023 1/9/2023 B - Approved as noted Answered
SW C 1/10/2023 1/9/2023 B - Approved as noted Answered
SW C 1/10/2023 1/9/2023 B - Approved as noted Answered
SW C 1/10/2023 1/9/2023 B - Approved as noted Answered
SW C 1/10/2023 1/9/2023 C - Revise & Resubmit Answered
CO S 1/9/2023 1/8/2023 B - Approved as noted Answered
CO S 1/9/2023 1/8/2023 B - Approved as noted Answered
CO S 1/9/2023 1/8/2023 B - Approved as noted Answered
CO S 1/9/2023 1/8/2023 C - Revise & Resubmit Answered
CO S 1/9/2023 1/8/2023 C - Revise & Resubmit Answered
SA S 1/7/2023 1/5/2023 B - Approved as noted Answered
CO S 12/24/2022 12/22/2022 B - Approved as noted Answered
CO S 12/24/2022 12/22/2022 B - Approved as noted Answered
CO S 12/24/2022 12/22/2022 B - Approved as noted Answered
CO S 12/24/2022 12/22/2022 B - Approved as noted Answered
CO S 1/8/2023 1/7/2023 B - Approved as noted Answered
CO S 1/8/2023 1/7/2023 B - Approved as noted Answered
CO S 1/8/2023 1/7/2023 B - Approved as noted Answered
PC S 1/8/2023 1/7/2023 B - Approved as noted Answered
MC S 1/8/2023 1/7/2023 B - Approved as noted Answered
CO S 1/8/2023 1/7/2023 B - Approved as noted Answered
CO S 1/8/2023 1/7/2023 B - Approved as noted Answered
CO S 1/8/2023 1/7/2023 B - Approved as noted Answered
TT A 1/10/2023 1/9/2023 B - Approved as noted Answered
PG C 1/10/2023 1/9/2023 B - Approved as noted Answered
PG C 1/10/2023 1/9/2023 B - Approved as noted Answered
WG C 1/10/2023 1/9/2023 B - Approved as noted Answered
PG SU 1/10/2023 1/9/2023 B - Approved as noted Answered
DG S 1/10/2023 1/9/2023 B - Approved as noted Answered
TB S 1/10/2023 1/9/2023 B - Approved as noted Answered
MB S 1/10/2023 1/12/2023 B - Approved as noted Answered
WG LS 1/10/2023 1/9/2023 B - Approved as noted Answered
WG LS 1/10/2023 1/9/2023 B - Approved as noted Answered
PC LS 1/10/2023 1/9/2023 A - Approved Answered
SW LS 1/10/2023 1/9/2023 A - Approved Answered
SW C 1/10/2023 1/9/2023 B - Approved as noted Answered
SW C 1/10/2023 1/9/2023 B - Approved as noted Answered
SW C 1/10/2023 1/9/2023 B - Approved as noted Answered
SW C 1/10/2023 1/9/2023 C - Revise & Resubmit Answered
SW C 1/10/2023 1/9/2023 B - Approved as noted Answered
PG C 1/9/2023 1/8/2023 B - Approved as noted Answered
PG C 1/9/2023 1/8/2023 B - Approved as noted Answered
TT SU 1/9/2023 1/8/2023 B - Approved as noted Answered
SW E 1/9/2023 1/8/2023 B - Approved as noted Answered
SW E 1/9/2023 1/8/2023 B - Approved as noted Answered
SW M 1/10/2023 1/9/2023 B - Approved as noted Answered
SW E 1/9/2023 1/8/2023 B - Approved as noted Answered
CO A 1/9/2023 1/8/2023 B - Approved as noted Answered
CO A 1/9/2023 1/8/2023 B - Approved as noted Answered
SW C 1/9/2023 1/8/2023 B - Approved as noted Answered
SW C 1/9/2023 1/8/2023 B - Approved as noted Answered
SW C 1/9/2023 1/8/2023 B - Approved as noted Answered
SW C 1/9/2023 1/8/2023 B - Approved as noted Answered
SW C 1/9/2023 1/8/2023 B - Approved as noted Answered
SW C 1/9/2023 1/8/2023 B - Approved as noted Answered
SW C 1/9/2023 1/8/2023 B - Approved as noted Answered
SW C 1/9/2023 1/8/2023 B - Approved as noted Answered
SW C 1/9/2023 1/8/2023 B - Approved as noted Answered
SW C 1/9/2023 1/9/2023 B - Approved as noted Answered
WG C 1/9/2023 1/8/2023 B - Approved as noted Answered
SW M 1/10/2023 1/8/2023 B - Approved as noted Answered
SW P 1/9/2023 1/8/2023 B - Approved as noted Answered
SW P 1/9/2023 1/8/2023 B - Approved as noted Answered
DG SU 1/7/2023 1/5/2023 B - Approved as noted Answered
WG C 1/7/2023 1/5/2023 B - Approved as noted Answered
WG C 1/7/2023 1/5/2023 B - Approved as noted Answered
TG E 1/5/2023 1/4/2023 B - Approved as noted Answered
VG S 10/6/2022 10/5/2022 B - Approved as noted Answered
NA LC 1/5/2023 1/4/2023 B - Approved as noted Answered
NA LC 1/7/2023 1/5/2023 B - Approved as noted Answered
SW C 1/7/2023 1/5/2023 B - Approved as noted Answered
SW C 1/7/2023 1/5/2023 B - Approved as noted Answered
SW C 1/7/2023 1/5/2023 B - Approved as noted Answered
SW C 1/7/2023 1/5/2023 B - Approved as noted Answered
PA LS 1/9/2023 1/5/2023 B - Approved as noted Answered
PA LS 1/9/2023 1/5/2023 B - Approved as noted Answered
PA C 1/7/2023 1/5/2023 B - Approved as noted Answered
PA C 1/7/2023 1/5/2023 B - Approved as noted Answered
PA C 1/7/2023 1/5/2023 B - Approved as noted Answered
CO E 1/7/2023 1/8/2023 B - Approved as noted Answered
CO E 1/9/2023 1/8/2023 B - Approved as noted Answered
CO E 1/9/2023 1/8/2023 B - Approved as noted Answered
AG E 1/9/2023 1/8/2023 B - Approved as noted Answered
CC M 1/7/2023 1/5/2023 B - Approved as noted Answered
CO C 1/7/2023 1/5/2023 B - Approved as noted Answered
MC C 12/31/2022 12/29/2022 B - Approved as noted Answered
CC C 1/5/2023 1/4/2023 B - Approved as noted Answered
CO C 1/5/2023 1/4/2023 B - Approved as noted Answered
NA S 1/7/2023 1/5/2023 B - Approved as noted Answered
CO S 1/7/2023 1/5/2023 B - Approved as noted Answered
CO S 1/7/2023 1/5/2023 B - Approved as noted Answered
NA S 1/7/2023 1/5/2023 B - Approved as noted Answered
NA S 1/7/2023 1/5/2023 B - Approved as noted Answered
MC S 1/7/2023 1/5/2023 B - Approved as noted Answered
MC S 1/7/2023 1/5/2023 B - Approved as noted Answered
MC S 1/7/2023 1/5/2023 B - Approved as noted Answered
MC S 1/5/2023 1/4/2023 C - Revise & Resubmit Answered
MC S 1/5/2023 1/4/2023 B - Approved as noted Answered
MC S 1/5/2023 1/4/2023 C - Revise & Resubmit Answered
CO S 1/5/2023 1/4/2023 B - Approved as noted Answered
CO S 1/5/2023 1/4/2023 B - Approved as noted Answered
PC S 1/5/2023 1/4/2023 B - Approved as noted Answered
CO S 1/5/2023 1/4/2023 B - Approved as noted Answered
CO SU 1/7/2023 1/5/2023 B - Approved as noted Answered
MC SU 1/7/2023 1/5/2023 B - Approved as noted Answered
NA SU 1/5/2023 1/4/2023 B - Approved as noted Answered
SW C 1/7/2023 1/5/2023 B - Approved as noted Answered
SW C 1/7/2023 1/5/2023 B - Approved as noted Answered
EC S 12/31/2022 12/29/2022 C - Revise & Resubmit Answered
SG LC 1/5/2023 1/4/2023 C - Revise & Resubmit Answered
SW E 1/5/2023 1/4/2023 C - Revise & Resubmit Answered
SW E 1/5/2023 1/4/2023 C - Revise & Resubmit Answered
SW E 1/5/2023 1/4/2023 C - Revise & Resubmit Answered
SW LS 1/5/2023 1/4/2023 B - Approved as noted Answered
SW LS 1/10/2023 1/4/2023 B - Approved as noted Answered
SW LS 1/10/2023 1/4/2023 B - Approved as noted Answered
SW LS 1/10/2023 1/4/2023 B - Approved as noted Answered
SW LS 1/10/2023 1/4/2023 B - Approved as noted Answered
SW LS 1/10/2023 1/4/2023 B - Approved as noted Answered
SW LS 1/10/2023 1/4/2023 B - Approved as noted Answered
SW LS 1/10/2023 1/4/2023 B - Approved as noted Answered
SW LS 1/10/2023 1/4/2023 B - Approved as noted Answered
SW LS 1/10/2023 1/4/2023 B - Approved as noted Answered
SW LS 1/10/2023 1/4/2023 B - Approved as noted Answered
SW LS 1/8/2023 1/4/2023 B - Approved as noted Answered
SW LS 1/8/2023 1/4/2023 B - Approved as noted Answered
SW LS 1/10/2023 1/4/2023 B - Approved as noted Answered
SW LS 1/10/2023 1/4/2023 B - Approved as noted Answered
SW LS 1/10/2023 1/4/2023 B - Approved as noted Answered
WG C 1/5/2023 1/4/2023 B - Approved as noted Answered
SW C 1/5/2023 1/4/2023 B - Approved as noted Answered
SW C 1/5/2023 1/4/2023 B - Approved as noted Answered
SW LS 1/5/2023 1/4/2023 A - Approved Answered
SW C 1/5/2023 1/4/2023 B - Approved as noted Answered
SW LS 1/5/2023 1/4/2023 A - Approved Answered
SW C 1/5/2023 1/4/2023 B - Approved as noted Answered
SW C 1/5/2023 1/4/2023 B - Approved as noted Answered
SW C 1/5/2023 1/4/2023 B - Approved as noted Answered
SW C 1/5/2023 1/4/2023 B - Approved as noted Answered
SW C 1/5/2023 1/4/2023 B - Approved as noted Answered
SW C 1/5/2023 1/4/2023 B - Approved as noted Answered
SW C 1/5/2023 1/4/2023 B - Approved as noted Answered
SW C 1/5/2023 1/4/2023 B - Approved as noted Answered
TB S 1/5/2023 1/4/2023 B - Approved as noted Answered
PG S 1/5/2023 1/4/2023 B - Approved as noted Answered
PG S 1/5/2023 1/4/2023 B - Approved as noted Answered
PG S 1/5/2023 1/4/2023 B - Approved as noted Answered
AG S 1/5/2023 1/4/2023 B - Approved as noted Answered
PG SU 1/5/2023 1/4/2023 B - Approved as noted Answered
PG SU 1/5/2023 1/4/2023 B - Approved as noted Answered
PG SU 1/5/2023 1/4/2023 B - Approved as noted Answered
SG LC 1/5/2023 1/4/2023 C - Revise & Resubmit Answered
AG SU 1/5/2023 1/4/2023 B - Approved as noted Answered
WG C 1/5/2023 1/4/2023 B - Approved as noted Answered
DG LC 1/5/2023 1/4/2023 C - Revise & Resubmit Answered
WG C 1/5/2023 1/4/2023 B - Approved as noted Answered
PG E 1/5/2023 1/4/2023 C - Revise & Resubmit Answered
DG E 1/5/2023 1/4/2023 C - Revise & Resubmit Answered
DG LC 1/5/2023 1/4/2023 C - Revise & Resubmit Answered
PG LC 1/5/2023 1/4/2023 C - Revise & Resubmit Answered
PG LC 1/5/2023 1/4/2023 C - Revise & Resubmit Answered
TT E 1/1/2023 12/31/2022 B - Approved as noted Answered
SW C 1/4/2023 1/3/2023 C - Revise & Resubmit Answered
SW C 1/4/2023 1/3/2023 B - Approved as noted Answered
SW E 1/3/2023 1/2/2023 B - Approved as noted Answered
SW C 1/4/2023 1/3/2023 B - Approved as noted Answered
SW C 1/4/2023 1/3/2023 C - Revise & Resubmit Answered
SW C 1/4/2023 1/3/2023 C - Revise & Resubmit Answered
SW C 1/4/2023 1/3/2023 C - Revise & Resubmit Answered
SW C 1/4/2023 1/3/2023 B - Approved as noted Answered
SW C 1/4/2023 1/3/2023 B - Approved as noted Answered
SW C 1/4/2023 1/3/2023 B - Approved as noted Answered
SW C 1/4/2023 1/3/2023 B - Approved as noted Answered
SW C 1/4/2023 1/3/2023 B - Approved as noted Answered
SW C 1/4/2023 1/3/2023 B - Approved as noted Answered
FC LC 1/4/2023 1/3/2023 C - Revise & Resubmit Answered
SW C 1/4/2023 1/3/2023 B - Approved as noted Answered
FC LC 1/4/2023 1/3/2023 C - Revise & Resubmit Answered
SW E 1/3/2023 1/2/2023 B - Approved as noted Answered
SW E 1/3/2023 1/2/2023 C - Revise & Resubmit Answered
PG S 1/4/2023 1/3/2023 B - Approved as noted Answered
PG S 1/4/2023 1/3/2023 C - Revise & Resubmit Answered
SW C 1/3/2023 1/2/2023 B - Approved as noted Answered
SW C 1/3/2023 1/2/2023 C - Revise & Resubmit Answered
SW C 1/3/2023 1/2/2023 B - Approved as noted Answered
SW P 1/4/2023 1/3/2023 C - Revise & Resubmit Answered
SA SU 1/4/2023 1/3/2023 B - Approved as noted Answered
CO SU 1/3/2023 1/2/2023 B - Approved as noted Answered
MC SU 1/3/2023 1/2/2023 B - Approved as noted Answered
NG C 1/3/2023 1/2/2023 B - Approved as noted Answered
CO SU 1/3/2023 1/2/2023 B - Approved as noted Answered
CG C 1/3/2023 1/2/2023 B - Approved as noted Answered
CO S 1/3/2023 1/2/2023 B - Approved as noted Answered
CO S 1/3/2023 1/2/2023 B - Approved as noted Answered
CO S 1/3/2023 1/2/2023 B - Approved as noted Answered
NG C 1/3/2023 1/2/2023 B - Approved as noted Answered
CO S 1/3/2023 1/2/2023 B - Approved as noted Answered
CG C 1/3/2023 1/2/2023 B - Approved as noted Answered
CO S 1/3/2023 1/2/2023 B - Approved as noted Answered
CO S 1/3/2023 1/2/2023 B - Approved as noted Answered
CO S 1/3/2023 1/2/2023 B - Approved as noted Answered
CO S 1/3/2023 1/2/2023 B - Approved as noted Answered
CO S 1/3/2023 1/2/2023 B - Approved as noted Answered
CO S 1/3/2023 1/2/2023 B - Approved as noted Answered
SA S 1/3/2023 1/2/2023 B - Approved as noted Answered
CO S 1/3/2023 1/2/2023 B - Approved as noted Answered
SW P 1/4/2023 1/3/2023 C - Revise & Resubmit Answered
NA P 1/3/2023 1/2/2023 B - Approved as noted Answered
WG C 1/3/2023 1/2/2023 B - Approved as noted Answered
DG C 1/3/2023 1/2/2023 B - Approved as noted Answered
AG LS 1/3/2023 1/2/2023 C - Revise & Resubmit Answered
WG LS 1/3/2023 1/2/2023 B - Approved as noted Answered
WG LS 1/3/2023 1/2/2023 B - Approved as noted Answered
CO SU 1/2/2023 1/1/2023 B - Approved as noted Answered
SA SU 1/2/2023 1/1/2023 B - Approved as noted Answered
LM SU 1/2/2023 1/1/2023 C - Revise & Resubmit Answered
CO SU 1/2/2023 1/1/2023 B - Approved as noted Answered
CO C 1/2/2023 1/1/2023 B - Approved as noted Answered
LM S 1/2/2023 1/1/2023 C - Revise & Resubmit Answered
SA S 1/2/2023 1/1/2023 C - Revise & Resubmit Answered
CO S 1/2/2023 1/1/2023 B - Approved as noted Answered
CO S 1/2/2023 1/1/2023 B - Approved as noted Answered
CO S 1/2/2023 1/1/2023 B - Approved as noted Answered
CO S 1/2/2023 1/1/2023 B - Approved as noted Answered
SW LC 1/2/2023 1/1/2023 B - Approved as noted Answered
SW LS 1/2/2023 1/1/2023 B - Approved as noted Answered
SW LS 1/2/2023 1/1/2023 B - Approved as noted Answered
SW LS 1/2/2023 1/1/2023 B - Approved as noted Answered
SW C 1/2/2023 1/1/2023 B - Approved as noted Answered
SW C 1/2/2023 1/1/2023 C - Revise & Resubmit Answered
SW C 1/2/2023 1/1/2023 B - Approved as noted Answered
SW C 1/2/2023 1/1/2023 B - Approved as noted Answered
SW LC 1/1/2023 12/31/2022 B - Approved as noted Answered
PG E 1/1/2023 12/31/2022 B - Approved as noted Answered
FC E 12/29/2022 12/28/2022 B - Approved as noted Answered
FC E 12/29/2022 12/28/2022 C - Revise & Resubmit Answered
SW M 1/2/2023 1/1/2023 B - Approved as noted Answered
TT LC 12/31/2022 12/29/2022 C - Revise & Resubmit Answered
TT LC 12/31/2022 12/29/2022 C - Revise & Resubmit Answered
TT LC 12/31/2022 12/29/2022 C - Revise & Resubmit Answered
WG LS 1/1/2023 12/31/2022 B - Approved as noted Answered
WG LS 1/1/2023 12/31/2022 C - Revise & Resubmit Answered
SW C 1/1/2023 12/31/2022 B - Approved as noted Answered
SW C 1/1/2023 12/31/2022 B - Approved as noted Answered
SW C 1/1/2023 12/31/2022 B - Approved as noted Answered
SW C 1/1/2023 12/31/2022 B - Approved as noted Answered
SW C 1/1/2023 12/31/2022 B - Approved as noted Answered
WG LS 1/1/2023 12/31/2022 C - Revise & Resubmit Answered
WG LS 1/1/2023 12/31/2022 C - Revise & Resubmit Answered
RD C 12/31/2022 12/29/2022 C - Revise & Resubmit Answered
FC A 12/31/2022 12/29/2022 B - Approved as noted Answered
TG S 12/31/2022 12/29/2022 B - Approved as noted Answered
AG S 12/31/2022 12/29/2022 C - Revise & Resubmit Answered
WG LS 12/31/2022 12/29/2022 B - Approved as noted Answered
SW C 12/31/2022 12/29/2022 B - Approved as noted Answered
SW C 12/31/2022 12/29/2022 B - Approved as noted Answered
SW C 12/31/2022 12/29/2022 B - Approved as noted Answered
SW C 12/31/2022 12/29/2022 B - Approved as noted Answered
WG C 12/31/2022 12/29/2022 B - Approved as noted Answered
WG C 12/31/2022 12/29/2022 B - Approved as noted Answered
SW C 12/31/2022 12/29/2022 C - Revise & Resubmit Answered
WG C 12/31/2022 12/29/2022 B - Approved as noted Answered
SW C 12/31/2022 12/29/2022 B - Approved as noted Answered
SW C 12/31/2022 12/29/2022 B - Approved as noted Answered
SW C 12/31/2022 12/29/2022 B - Approved as noted Answered
SW C 12/31/2022 12/29/2022 B - Approved as noted Answered
SW C 12/31/2022 12/29/2022 B - Approved as noted Answered
SW C 12/31/2022 12/29/2022 C - Revise & Resubmit Answered
SW C 12/31/2022 12/29/2022 C - Revise & Resubmit Answered
SW C 12/31/2022 12/29/2022 C - Revise & Resubmit Answered
SW C 12/31/2022 12/29/2022 C - Revise & Resubmit Answered
SW C 12/31/2022 12/29/2022 B - Approved as noted Answered
PG C 12/31/2022 12/29/2022 B - Approved as noted Answered
SW C 12/31/2022 12/29/2022 B - Approved as noted Answered
WG C 12/31/2022 12/29/2022 B - Approved as noted Answered
SW C 12/31/2022 12/29/2022 B - Approved as noted Answered
SW C 12/31/2022 12/29/2022 B - Approved as noted Answered
WG C 12/31/2022 12/29/2022 B - Approved as noted Answered
SW C 12/31/2022 12/29/2022 B - Approved as noted Answered
PG C 12/31/2022 12/29/2022 B - Approved as noted Answered
SW C 12/31/2022 12/29/2022 B - Approved as noted Answered
DG C 12/31/2022 12/29/2022 C - Revise & Resubmit Answered
WG C 12/31/2022 12/29/2022 B - Approved as noted Answered
TG SU 12/31/2022 12/29/2022 B - Approved as noted Answered
PG SU 12/31/2022 12/29/2022 B - Approved as noted Answered
PC P 1/1/2023 12/31/2022 B - Approved as noted Answered
SW LS 12/27/2022 12/26/2022 A - Approved Answered
MC C 12/31/2022 12/29/2022 C - Revise & Resubmit Answered
CO C 1/1/2023 12/31/2022 C - Revise & Resubmit Answered
CO C 12/31/2022 12/29/2022 B - Approved as noted Answered
NA A 12/31/2022 12/29/2022 B - Approved as noted Answered
CO SU 12/31/2022 12/29/2022 B - Approved as noted Answered
CO S 12/31/2022 12/27/2022 B - Approved as noted Answered
EC S 12/31/2022 12/29/2022 B - Approved as noted Answered
NA S 12/31/2022 12/29/2022 B - Approved as noted Answered
NA S 12/31/2022 12/29/2022 C - Revise & Resubmit Answered
CO S 12/31/2022 12/29/2022 B - Approved as noted Answered
CO S 12/31/2022 12/29/2022 B - Approved as noted Answered
SW E 12/29/2022 12/28/2022 B - Approved as noted Answered
CO S 12/31/2022 12/29/2022 C - Revise & Resubmit Answered
SW E 12/28/2022 12/27/2022 B - Approved as noted Answered
CO S 12/31/2022 12/29/2022 B - Approved as noted Answered
SW E 12/28/2022 12/27/2022 B - Approved as noted Answered
PC E 12/28/2022 12/27/2022 B - Approved as noted Answered
CO S 12/31/2022 12/29/2022 C - Revise & Resubmit Answered
NA S 12/31/2022 12/29/2022 B - Approved as noted Answered
EC S 12/31/2022 12/29/2022 C - Revise & Resubmit Answered
NA S 12/31/2022 12/29/2022 B - Approved as noted Answered
NA S 12/31/2022 12/29/2022 B - Approved as noted Answered
CO S 12/31/2022 12/29/2022 B - Approved as noted Answered
CO S 12/31/2022 12/29/2022 B - Approved as noted Answered
NA S 12/31/2022 12/29/2022 C - Revise & Resubmit Answered
NA S 12/31/2022 12/29/2022 B - Approved as noted Answered
MC C 12/31/2022 12/29/2022 C - Revise & Resubmit Answered
CO SU 12/31/2022 12/29/2022 B - Approved as noted Answered
CO SU 12/31/2022 12/29/2022 C - Revise & Resubmit Answered
CO S 12/31/2022 12/29/2022 B - Approved as noted Answered
CO S 12/31/2022 12/29/2022 B - Approved as noted Answered
CO S 12/31/2022 12/29/2022 C - Revise & Resubmit Answered
SA LC 12/29/2022 12/28/2022 B - Approved as noted Answered
FC LC 12/29/2022 12/28/2022 C - Revise & Resubmit Answered
SA S 1/1/2023 12/31/2022 B - Approved as noted Answered
CO S 12/31/2022 12/29/2022 B - Approved as noted Answered
NA S 12/31/2022 12/29/2022 B - Approved as noted Answered
FC LC 12/29/2022 12/28/2022 C - Revise & Resubmit Answered
CO S 12/31/2022 12/29/2022 B - Approved as noted Answered
CO S 12/31/2022 12/29/2022 C - Revise & Resubmit Answered
CO S 12/31/2022 12/29/2022 B - Approved as noted Answered
CO S 12/31/2022 12/29/2022 B - Approved as noted Answered
CO S 12/31/2022 12/29/2022 B - Approved as noted Answered
SA LC 12/28/2022 12/27/2022 C - Revise & Resubmit Answered
PC LC 12/28/2022 12/27/2022 B - Approved as noted Answered
CO S 12/31/2022 12/29/2022 B - Approved as noted Answered
CO S 12/31/2022 12/29/2022 C - Revise & Resubmit Answered
CO S 12/31/2022 12/29/2022 B - Approved as noted Answered
CF S 12/21/2022 12/20/2022 B - Approved as noted Answered
CF S 12/24/2022 12/22/2022 B - Approved as noted Answered
CO S 12/22/2022 12/21/2022 B - Approved as noted Answered
CO S 12/22/2022 12/21/2022 B - Approved as noted Answered
CO SU 12/24/2022 12/22/2022 B - Approved as noted Answered
PG C 12/29/2022 12/28/2022 B - Approved as noted Answered
WG C 12/29/2022 12/28/2022 C - Revise & Resubmit Answered
WG C 12/29/2022 12/28/2022 B - Approved as noted Answered
WG C 12/29/2022 12/28/2022 B - Approved as noted Answered
WG C 12/29/2022 12/28/2022 B - Approved as noted Answered
PG S 12/29/2022 12/28/2022 C - Revise & Resubmit Answered
PG S 12/29/2022 12/28/2022 B - Approved as noted Answered
WG S 12/29/2022 12/28/2022 C - Revise & Resubmit Answered
PG S 12/29/2022 12/28/2022 B - Approved as noted Answered
TB S 12/29/2022 12/28/2022 B - Approved as noted Answered
TB SU 12/29/2022 12/28/2022 B - Approved as noted Answered
TG E 12/28/2022 12/27/2022 B - Approved as noted Answered
SW M 12/31/2022 12/29/2022 B - Approved as noted Answered
SW M 1/1/2023 12/29/2022 B - Approved as noted Answered
SW M 12/31/2022 12/29/2022 B - Approved as noted Answered
SW LS 12/29/2022 12/28/2022 B - Approved as noted Answered
SW LS 12/29/2022 12/28/2022 B - Approved as noted Answered
PC SU 12/29/2022 12/28/2022 B - Approved as noted Answered
EC SU 12/29/2022 12/28/2022 B - Approved as noted Answered
CO SU 12/29/2022 12/28/2022 B - Approved as noted Answered
CO SU 12/29/2022 12/28/2022 B - Approved as noted Answered
CO SU 12/29/2022 12/28/2022 B - Approved as noted Answered
SW C 12/29/2022 12/28/2022 B - Approved as noted Answered
MC C 12/29/2022 12/28/2022 B - Approved as noted Answered
SW C 12/29/2022 12/28/2022 B - Approved as noted Answered
MC C 12/29/2022 12/28/2022 B - Approved as noted Answered
SW C 12/29/2022 12/28/2022 B - Approved as noted Answered
PC S 12/29/2022 12/28/2022 B - Approved as noted Answered
PC S 12/29/2022 12/28/2022 B - Approved as noted Answered
PC S 12/29/2022 12/28/2022 B - Approved as noted Answered
SW C 12/29/2022 12/28/2022 B - Approved as noted Answered
EC S 12/29/2022 12/28/2022 B - Approved as noted Answered
SW C 12/29/2022 12/28/2022 B - Approved as noted Answered
EC S 12/29/2022 12/28/2022 B - Approved as noted Answered
SW C 12/29/2022 12/28/2022 B - Approved as noted Answered
SW C 12/29/2022 12/28/2022 B - Approved as noted Answered
CO S 12/29/2022 12/28/2022 B - Approved as noted Answered
CO S 12/29/2022 12/28/2022 B - Approved as noted Answered
CO S 12/29/2022 12/28/2022 B - Approved as noted Answered
CO S 12/29/2022 12/28/2022 B - Approved as noted Answered
CO S 12/29/2022 12/28/2022 B - Approved as noted Answered
CO S 12/29/2022 12/28/2022 B - Approved as noted Answered
WG C 12/29/2022 12/28/2022 B - Approved as noted Answered
SW C 12/29/2022 12/28/2022 B - Approved as noted Answered
SW C 12/29/2022 12/28/2022 B - Approved as noted Answered
SW M 12/29/2022 12/28/2022 B - Approved as noted Answered
SW M 12/28/2022 12/27/2022 B - Approved as noted Answered
PG C 12/28/2022 12/27/2022 B - Approved as noted Answered
PG C 12/28/2022 12/27/2022 B - Approved as noted Answered
WG C 12/28/2022 12/27/2022 B - Approved as noted Answered
WG C 12/28/2022 12/27/2022 B - Approved as noted Answered
WG C 12/28/2022 12/27/2022 B - Approved as noted Answered
WG C 12/28/2022 12/27/2022 B - Approved as noted Answered
WG LS 12/28/2022 12/27/2022 B - Approved as noted Answered
TT SU 12/28/2022 12/27/2022 C - Revise & Resubmit Answered
SW C 12/28/2022 12/27/2022 B - Approved as noted Answered
SW C 12/28/2022 12/27/2022 B - Approved as noted Answered
EC SU 12/28/2022 12/27/2022 B - Approved as noted Answered
CO SU 12/28/2022 12/27/2022 B - Approved as noted Answered
CO SU 12/28/2022 12/27/2022 B - Approved as noted Answered
SW C 12/28/2022 12/27/2022 B - Approved as noted Answered
SW C 12/28/2022 12/27/2022 B - Approved as noted Answered
PC SU 12/28/2022 12/27/2022 B - Approved as noted Answered
SW C 12/28/2022 12/27/2022 B - Approved as noted Answered
SW C 12/28/2022 12/27/2022 B - Approved as noted Answered
SW C 12/28/2022 12/27/2022 B - Approved as noted Answered
SW C 12/28/2022 12/27/2022 B - Approved as noted Answered
SW C 12/28/2022 12/27/2022 C - Revise & Resubmit Answered
SW C 12/28/2022 12/27/2022 B - Approved as noted Answered
SW C 12/28/2022 12/27/2022 B - Approved as noted Answered
MC C 12/28/2022 12/27/2022 B - Approved as noted Answered
SW C 12/28/2022 12/27/2022 B - Approved as noted Answered
CO C 12/28/2022 12/27/2022 B - Approved as noted Answered
SW C 12/28/2022 12/27/2022 B - Approved as noted Answered
SW C 12/28/2022 12/27/2022 B - Approved as noted Answered
CO C 12/28/2022 12/27/2022 B - Approved as noted Answered
SW C 12/28/2022 12/27/2022 B - Approved as noted Answered
SW C 12/28/2022 12/27/2022 B - Approved as noted Answered
CO C 12/28/2022 12/27/2022 B - Approved as noted Answered
SW C 12/28/2022 12/27/2022 B - Approved as noted Answered
SW C 12/28/2022 12/27/2022 B - Approved as noted Answered
EC S 12/28/2022 12/27/2022 B - Approved as noted Answered
SW C 12/28/2022 12/27/2022 B - Approved as noted Answered
EC S 12/31/2022 12/27/2022 B - Approved as noted Answered
CO S 12/28/2022 12/27/2022 B - Approved as noted Answered
SW C 12/28/2022 12/27/2022 B - Approved as noted Answered
CO S 12/28/2022 12/27/2022 B - Approved as noted Answered
SW C 12/28/2022 12/27/2022 B - Approved as noted Answered
CO S 12/28/2022 12/27/2022 B - Approved as noted Answered
SW C 12/28/2022 12/27/2022 B - Approved as noted Answered
CO S 12/28/2022 12/27/2022 B - Approved as noted Answered
SW C 12/28/2022 12/27/2022 B - Approved as noted Answered
CO S 12/28/2022 12/27/2022 B - Approved as noted Answered
SW C 12/28/2022 12/27/2022 B - Approved as noted Answered
CO S 12/28/2022 12/27/2022 B - Approved as noted Answered
SW C 12/28/2022 12/27/2022 B - Approved as noted Answered
SW C 12/28/2022 12/27/2022 B - Approved as noted Answered
CO S 12/31/2022 12/27/2022 B - Approved as noted Answered
SW C 12/28/2022 12/27/2022 B - Approved as noted Answered
CO S 12/28/2022 12/27/2022 B - Approved as noted Answered
SW C 12/28/2022 12/27/2022 B - Approved as noted Answered
PA C 12/28/2022 12/27/2022 B - Approved as noted Answered
CO S 12/28/2022 12/27/2022 B - Approved as noted Answered
PA C 12/28/2022 12/27/2022 B - Approved as noted Answered
CO S 12/28/2022 12/27/2022 B - Approved as noted Answered
SA S 12/28/2022 12/27/2022 B - Approved as noted Answered
CO S 12/24/2022 12/22/2022 C - Revise & Resubmit Answered
TG LC 12/28/2022 12/27/2022 B - Approved as noted Answered
TG LC 12/28/2022 12/27/2022 B - Approved as noted Answered
TG S 12/28/2022 12/27/2022 B - Approved as noted Answered
TT S 12/28/2022 12/27/2022 C - Revise & Resubmit Answered
PG S 12/28/2022 12/27/2022 C - Revise & Resubmit Answered
TT S 1/1/2023 12/27/2022 B - Approved as noted Answered
WG C 12/27/2022 12/26/2022 C - Revise & Resubmit Answered
PG C 12/27/2022 12/26/2022 B - Approved as noted Answered
WG S 12/28/2022 12/26/2022 C - Revise & Resubmit Answered
WG S 12/27/2022 12/26/2022 B - Approved as noted Answered
WG S 12/27/2022 12/26/2022 B - Approved as noted Answered
WG S 12/27/2022 12/26/2022 B - Approved as noted Answered
WG S 12/27/2022 12/26/2022 B - Approved as noted Answered
FC A 12/26/2022 12/25/2022 B - Approved as noted Answered
TB S 12/26/2022 12/25/2022 B - Approved as noted Answered
AG C 12/26/2022 12/25/2022 B - Approved as noted Answered
WG C 12/26/2022 12/25/2022 B - Approved as noted Answered
WG C 12/27/2022 12/25/2022 B - Approved as noted Answered
WG C 12/26/2022 12/25/2022 B - Approved as noted Answered
WG C 12/26/2022 12/25/2022 B - Approved as noted Answered
WG C 12/26/2022 12/25/2022 B - Approved as noted Answered
DG C 12/26/2022 12/25/2022 B - Approved as noted Answered
PG C 12/26/2022 12/25/2022 B - Approved as noted Answered
PG C 12/26/2022 12/25/2022 B - Approved as noted Answered
TG C 12/26/2022 12/25/2022 B - Approved as noted Answered
DG LS 12/26/2022 12/25/2022 B - Approved as noted Answered
TB E 12/27/2022 12/26/2022 B - Approved as noted Answered
SW E 12/27/2022 12/26/2022 B - Approved as noted Answered
SW E 12/27/2022 12/26/2022 B - Approved as noted Answered
SW E 12/27/2022 12/26/2022 C - Revise & Resubmit Answered
SW E 12/27/2022 12/26/2022 B - Approved as noted Answered
SW E 12/27/2022 12/26/2022 B - Approved as noted Answered
SW E 12/26/2022 12/25/2022 B - Approved as noted Answered
SW E 12/26/2022 12/25/2022 B - Approved as noted Answered
TT LC 12/26/2022 12/25/2022 B - Approved as noted Answered
NA C 12/27/2022 12/26/2022 B - Approved as noted Answered
CO C 12/27/2022 12/26/2022 B - Approved as noted Answered
MC C 12/27/2022 12/26/2022 B - Approved as noted Answered
SA SU 12/27/2022 12/26/2022 C - Revise & Resubmit Answered
CO SU 12/27/2022 12/26/2022 C - Revise & Resubmit Answered
CO SU 12/27/2022 12/26/2022 B - Approved as noted Answered
CO SU 12/27/2022 12/26/2022 B - Approved as noted Answered
CO SU 12/27/2022 12/26/2022 B - Approved as noted Answered
MC SU 12/27/2022 12/26/2022 B - Approved as noted Answered
EC SU 12/27/2022 12/26/2022 B - Approved as noted Answered
CO SU 12/27/2022 12/26/2022 B - Approved as noted Answered
CO SU 12/27/2022 12/26/2022 B - Approved as noted Answered
CO SU 12/27/2022 12/26/2022 B - Approved as noted Answered
SW C 12/27/2022 12/26/2022 B - Approved as noted Answered
CO SU 12/27/2022 12/26/2022 B - Approved as noted Answered
NA SU 12/27/2022 12/26/2022 B - Approved as noted Answered
CO SU 12/27/2022 12/26/2022 B - Approved as noted Answered
SW C 12/27/2022 12/26/2022 B - Approved as noted Answered
PC S 12/27/2022 12/26/2022 B - Approved as noted Answered
PC S 12/27/2022 12/26/2022 C - Revise & Resubmit Answered
PC S 12/27/2022 12/26/2022 B - Approved as noted Answered
SW C 12/27/2022 12/26/2022 B - Approved as noted Answered
CO S 12/27/2022 12/26/2022 B - Approved as noted Answered
CO S 12/27/2022 12/26/2022 B - Approved as noted Answered
EC S 12/27/2022 12/26/2022 B - Approved as noted Answered
SW C 12/27/2022 12/26/2022 C - Revise & Resubmit Answered
SW C 12/27/2022 12/28/2022 B - Approved as noted Answered
SA S 12/27/2022 12/26/2022 B - Approved as noted Answered
SW C 12/27/2022 12/26/2022 C - Revise & Resubmit Answered
CO S 12/27/2022 12/26/2022 B - Approved as noted Answered
SW C 12/27/2022 12/26/2022 B - Approved as noted Answered
CO S 12/27/2022 12/26/2022 B - Approved as noted Answered
SW C 12/27/2022 12/26/2022 A - Approved Answered
CO S 12/27/2022 12/26/2022 C - Revise & Resubmit Answered
SW C 12/27/2022 12/26/2022 B - Approved as noted Answered
PC S 12/27/2022 12/26/2022 B - Approved as noted Answered
SW C 12/27/2022 12/26/2022 B - Approved as noted Answered
SW C 12/27/2022 12/26/2022 B - Approved as noted Answered
MC S 12/27/2022 12/26/2022 B - Approved as noted Answered
SW C 12/27/2022 12/26/2022 B - Approved as noted Answered
MC S 12/27/2022 12/26/2022 B - Approved as noted Answered
SW C 12/27/2022 12/26/2022 B - Approved as noted Answered
EC S 12/27/2022 12/26/2022 C - Revise & Resubmit Answered
SW C 12/27/2022 12/26/2022 B - Approved as noted Answered
CO S 12/27/2022 12/26/2022 B - Approved as noted Answered
SW C 12/27/2022 12/26/2022 B - Approved as noted Answered
CO S 12/27/2022 12/26/2022 B - Approved as noted Answered
CO S 12/27/2022 12/26/2022 B - Approved as noted Answered
SW C 12/27/2022 12/26/2022 B - Approved as noted Answered
CO S 12/27/2022 12/26/2022 B - Approved as noted Answered
SW C 12/27/2022 12/26/2022 B - Approved as noted Answered
SW C 12/27/2022 12/26/2022 B - Approved as noted Answered
CO S 12/27/2022 12/26/2022 B - Approved as noted Answered
SW M 12/27/2022 12/26/2022 B - Approved as noted Answered
CO S 12/27/2022 12/26/2022 B - Approved as noted Answered
SW C 12/27/2022 12/26/2022 B - Approved as noted Answered
CO S 12/27/2022 12/26/2022 B - Approved as noted Answered
CO S 12/27/2022 12/26/2022 B - Approved as noted Answered
MC S 12/27/2022 12/26/2022 B - Approved as noted Answered
SW LS 12/27/2022 12/26/2022 B - Approved as noted Answered
NA S 12/27/2022 12/26/2022 B - Approved as noted Answered
CO S 12/28/2022 12/27/2022 B - Approved as noted Answered
CO S 12/27/2022 12/26/2022 B - Approved as noted Answered
CO S 12/27/2022 12/26/2022 B - Approved as noted Answered
CO S 12/27/2022 12/26/2022 B - Approved as noted Answered
NA S 12/27/2022 12/26/2022 B - Approved as noted Answered
EC SS 12/27/2022 12/26/2022 B - Approved as noted Answered
CO S 12/27/2022 12/26/2022 B - Approved as noted Answered
WG C 12/27/2022 12/26/2022 B - Approved as noted Answered
WG C 12/27/2022 12/26/2022 B - Approved as noted Answered
SW LS 12/27/2022 12/26/2022 A - Approved Answered
SW LS 12/27/2022 12/26/2022 A - Approved Answered
SW P 12/27/2022 12/26/2022 C - Revise & Resubmit Answered
SW P 12/27/2022 12/26/2022 B - Approved as noted Answered
SA P 12/27/2022 12/26/2022 B - Approved as noted Answered
GC LC 12/26/2022 12/25/2022 B - Approved as noted Answered
GC LC 12/26/2022 12/25/2022 B - Approved as noted Answered
ZG LC 12/26/2022 12/25/2022 B - Approved as noted Answered
SW C 12/26/2022 12/25/2022 B - Approved as noted Answered
SW C 12/26/2022 12/25/2022 B - Approved as noted Answered
SW C 12/26/2022 12/25/2022 B - Approved as noted Answered
SW C 12/26/2022 12/25/2022 B - Approved as noted Answered
WG E 12/26/2022 12/25/2022 B - Approved as noted Answered
SW C 12/26/2022 12/25/2022 B - Approved as noted Answered
SW C 12/26/2022 12/25/2022 B - Approved as noted Answered
PG E 12/26/2022 12/25/2022 B - Approved as noted Answered
CO SU 12/26/2022 12/25/2022 B - Approved as noted Answered
PG E 12/25/2022 12/25/2022 B - Approved as noted Answered
EC C 12/26/2022 12/25/2022 B - Approved as noted Answered
MC C 12/26/2022 12/25/2022 B - Approved as noted Answered
CO C 12/26/2022 12/25/2022 B - Approved as noted Answered
MC C 12/26/2022 12/25/2022 B - Approved as noted Answered
CO C 12/26/2022 12/25/2022 B - Approved as noted Answered
MC C 12/26/2022 12/25/2022 B - Approved as noted Answered
MC C 12/26/2022 12/25/2022 B - Approved as noted Answered
CO C 12/20/2022 12/19/2022 B - Approved as noted Answered
SW C 12/26/2022 12/25/2022 B - Approved as noted Answered
SW C 12/26/2022 12/25/2022 B - Approved as noted Answered
SW C 12/26/2022 12/25/2022 B - Approved as noted Answered
SW C 12/26/2022 12/25/2022 B - Approved as noted Answered
SW C 12/26/2022 12/25/2022 B - Approved as noted Answered
SW C 12/26/2022 12/25/2022 B - Approved as noted Answered
SW C 12/26/2022 12/25/2022 C - Revise & Resubmit Answered
PA C 12/26/2022 12/25/2022 B - Approved as noted Answered
CC S 12/26/2022 12/25/2022 B - Approved as noted Answered
SA S 12/26/2022 12/25/2022 B - Approved as noted Answered
EC S 12/26/2022 12/25/2022 B - Approved as noted Answered
CO S 12/26/2022 12/25/2022 B - Approved as noted Answered
PC S 12/28/2022 12/27/2022 B - Approved as noted Answered
CO S 12/26/2022 12/25/2022 B - Approved as noted Answered
CC P 12/26/2022 12/25/2022 B - Approved as noted Answered
CO S 12/26/2022 12/25/2022 B - Approved as noted Answered
MC S 12/26/2022 12/25/2022 B - Approved as noted Answered
EC S 12/26/2022 12/25/2022 B - Approved as noted Answered
EC S 12/26/2022 12/25/2022 B - Approved as noted Answered
MC S 12/26/2022 12/25/2022 B - Approved as noted Answered
CO S 12/26/2022 12/25/2022 B - Approved as noted Answered
CO S 12/26/2022 12/25/2022 C - Revise & Resubmit Answered
CO S 12/26/2022 12/25/2022 B - Approved as noted Answered
CO S 12/26/2022 12/25/2022 B - Approved as noted Answered
CO S 12/26/2022 12/25/2022 B - Approved as noted Answered
MC S 12/26/2022 12/25/2022 B - Approved as noted Answered
MC S 12/26/2022 12/25/2022 B - Approved as noted Answered
MC S 12/26/2022 12/25/2022 B - Approved as noted Answered
MC S 12/26/2022 12/25/2022 B - Approved as noted Answered
MC S 12/26/2022 12/25/2022 B - Approved as noted Answered
MC S 12/26/2022 12/25/2022 B - Approved as noted Answered
NA S 12/26/2022 12/25/2022 B - Approved as noted Answered
SW E 12/15/2022 12/14/2022 B - Approved as noted Answered
TG C 12/25/2022 12/24/2022 B - Approved as noted Answered
WG C 12/25/2022 12/24/2022 B - Approved as noted Answered
WG C 12/25/2022 12/24/2022 B - Approved as noted Answered
WG S 12/25/2022 12/24/2022 B - Approved as noted Answered
WG S 12/25/2022 12/24/2022 B - Approved as noted Answered
SW E 12/21/2022 12/20/2022 B - Approved as noted Answered
SW E 12/25/2022 12/24/2022 C - Revise & Resubmit Answered
SW E 12/25/2022 12/24/2022 C - Revise & Resubmit Answered
CO E 12/22/2022 12/21/2022 C - Revise & Resubmit Answered
CO E 12/22/2022 12/21/2022 C - Revise & Resubmit Answered
CO E 12/22/2022 12/21/2022 C - Revise & Resubmit Answered
CO E 12/22/2022 12/21/2022 C - Revise & Resubmit Answered
CO E 12/22/2022 12/21/2022 C - Revise & Resubmit Answered
AG E 12/22/2022 12/21/2022 C - Revise & Resubmit Answered
GC LC 12/25/2022 12/24/2022 C - Revise & Resubmit Answered
GC LC 12/25/2022 12/24/2022 C - Revise & Resubmit Answered
SW C 12/25/2022 12/24/2022 B - Approved as noted Answered
SW C 12/28/2022 12/24/2022 B - Approved as noted Answered
SW C 12/25/2022 12/24/2022 B - Approved as noted Answered
SW C 12/25/2022 12/24/2022 B - Approved as noted Answered
SW C 12/25/2022 12/24/2022 B - Approved as noted Answered
SW C 12/25/2022 12/24/2022 B - Approved as noted Answered
SW C 12/25/2022 12/24/2022 B - Approved as noted Answered
SW C 12/25/2022 12/24/2022 B - Approved as noted Answered
SW C 12/25/2022 12/24/2022 B - Approved as noted Answered
SW C 12/25/2022 12/24/2022 B - Approved as noted Answered
SW C 12/25/2022 12/24/2022 B - Approved as noted Answered
SW C 12/25/2022 12/24/2022 C - Revise & Resubmit Answered
SW C 12/25/2022 12/24/2022 B - Approved as noted Answered
WG P 12/25/2022 12/24/2022 B - Approved as noted Answered
SW C 12/25/2022 12/24/2022 B - Approved as noted Answered
SW C 12/25/2022 12/24/2022 B - Approved as noted Answered
SW C 12/25/2022 12/24/2022 C - Revise & Resubmit Answered
SW C 12/25/2022 12/24/2022 B - Approved as noted Answered
SW LS 12/24/2022 12/22/2022 C - Revise & Resubmit Answered
SW C 12/24/2022 12/22/2022 B - Approved as noted Answered
SW C 12/24/2022 12/22/2022 B - Approved as noted Answered
SW C 12/24/2022 12/22/2022 B - Approved as noted Answered
SW LS 12/24/2022 12/22/2022 B - Approved as noted Answered
SW LS 12/24/2022 12/22/2022 B - Approved as noted Answered
SW LS 12/24/2022 12/22/2022 B - Approved as noted Answered
SW LS 12/24/2022 12/22/2022 B - Approved as noted Answered
CO C 12/25/2022 12/24/2022 B - Approved as noted Answered
SW LS 12/24/2022 12/22/2022 B - Approved as noted Answered
MC C 12/25/2022 12/24/2022 B - Approved as noted Answered
CO C 12/25/2022 12/24/2022 B - Approved as noted Answered
CO C 12/25/2022 12/24/2022 B - Approved as noted Answered
MC SU 12/25/2022 12/24/2022 B - Approved as noted Answered
MC SU 12/25/2022 12/24/2022 B - Approved as noted Answered
MC SU 12/25/2022 12/24/2022 B - Approved as noted Answered
CO SU 12/25/2022 12/24/2022 B - Approved as noted Answered
SW C 12/24/2022 12/22/2022 B - Approved as noted Answered
MC S 12/25/2022 12/24/2022 B - Approved as noted Answered
SW C 12/24/2022 12/22/2022 B - Approved as noted Answered
MC S 12/25/2022 12/24/2022 B - Approved as noted Answered
MC S 12/25/2022 12/24/2022 B - Approved as noted Answered
SW C 12/24/2022 12/22/2022 B - Approved as noted Answered
SW C 12/24/2022 12/22/2022 B - Approved as noted Answered
MC S 12/25/2022 12/24/2022 B - Approved as noted Answered
MC S 12/25/2022 12/24/2022 B - Approved as noted Answered
SW C 12/24/2022 12/22/2022 B - Approved as noted Answered
SW C 12/24/2022 12/22/2022 B - Approved as noted Answered
MC S 12/25/2022 12/24/2022 B - Approved as noted Answered
MC S 12/25/2022 12/24/2022 B - Approved as noted Answered
SW C 12/24/2022 12/22/2022 B - Approved as noted Answered
SW C 12/24/2022 12/22/2022 B - Approved as noted Answered
SW C 12/24/2022 12/22/2022 B - Approved as noted Answered
SW C 12/24/2022 12/22/2022 C - Revise & Resubmit Answered
SW C 12/27/2022 12/26/2022 B - Approved as noted Answered
SW C 12/24/2022 12/22/2022 B - Approved as noted Answered
CO S 12/25/2022 12/24/2022 B - Approved as noted Answered
SW C 12/24/2022 12/22/2022 B - Approved as noted Answered
SW C 12/24/2022 12/22/2022 B - Approved as noted Answered
CO S 12/25/2022 12/24/2022 B - Approved as noted Answered
SW C 12/24/2022 12/22/2022 B - Approved as noted Answered
CO S 12/25/2022 12/24/2022 B - Approved as noted Answered
SW C 12/24/2022 12/22/2022 B - Approved as noted Answered
CO S 12/25/2022 12/24/2022 B - Approved as noted Answered
SW C 12/24/2022 12/22/2022 C - Revise & Resubmit Answered
SA LC 12/24/2022 12/22/2022 B - Approved as noted Answered
TT LC 12/24/2022 12/22/2022 B - Approved as noted Answered
TT LC 12/22/2022 12/22/2022 B - Approved as noted Answered
TT LC 12/24/2022 12/22/2022 B - Approved as noted Answered
SW E 12/24/2022 12/22/2022 C - Revise & Resubmit Answered
SW E 12/24/2022 12/22/2022 B - Approved as noted Answered
CO C 12/24/2022 12/22/2022 B - Approved as noted Answered
MC C 12/24/2022 12/22/2022 B - Approved as noted Answered
MC C 12/24/2022 12/22/2022 B - Approved as noted Answered
MC C 12/24/2022 12/22/2022 B - Approved as noted Answered
MC SU 12/24/2022 12/22/2022 B - Approved as noted Answered
CO SU 12/24/2022 12/22/2022 B - Approved as noted Answered
LM S 12/13/2022 12/12/2022 B - Approved as noted Answered
LM S 12/13/2022 12/12/2022 C - Revise & Resubmit Answered
MC S 12/24/2022 12/22/2022 B - Approved as noted Answered
CO S 12/24/2022 12/22/2022 B - Approved as noted Answered
LM S 12/24/2022 12/22/2022 C - Revise & Resubmit Answered
CO S 12/24/2022 12/22/2022 B - Approved as noted Answered
MC S 12/24/2022 12/22/2022 B - Approved as noted Answered
CC S 12/24/2022 12/22/2022 B - Approved as noted Answered
CO S 12/24/2022 12/22/2022 B - Approved as noted Answered
CO S 12/24/2022 12/22/2022 B - Approved as noted Answered
CO S 12/24/2022 12/22/2022 B - Approved as noted Answered
CO S 12/24/2022 12/22/2022 B - Approved as noted Answered
CO S 12/24/2022 12/22/2022 B - Approved as noted Answered
CO S 12/24/2022 12/22/2022 B - Approved as noted Answered
CO S 12/24/2022 12/22/2022 B - Approved as noted Answered
CO S 12/24/2022 12/22/2022 B - Approved as noted Answered
MC S 12/24/2022 12/22/2022 B - Approved as noted Answered
NA S 12/24/2022 12/22/2022 B - Approved as noted Answered
CO S 12/24/2022 12/22/2022 B - Approved as noted Answered
CO S 12/24/2022 12/22/2022 B - Approved as noted Answered
CO S 12/24/2022 12/22/2022 B - Approved as noted Answered
PG C 12/24/2022 12/22/2022 B - Approved as noted Answered
WG C 12/24/2022 12/22/2022 B - Approved as noted Answered
WG C 12/24/2022 12/22/2022 B - Approved as noted Answered
PG C 12/24/2022 12/22/2022 B - Approved as noted Answered
PG C 12/24/2022 12/22/2022 B - Approved as noted Answered
WG S 12/24/2022 12/22/2022 B - Approved as noted Answered
WG S 12/24/2022 12/22/2022 B - Approved as noted Answered
SW M 12/24/2022 12/22/2022 B - Approved as noted Answered
WG LS 12/24/2022 12/22/2022 B - Approved as noted Answered
WG C 12/28/2022 12/22/2022 B - Approved as noted Answered
WG C 12/24/2022 12/22/2022 B - Approved as noted Answered
SW C 12/24/2022 12/22/2022 B - Approved as noted Answered
SW C 12/24/2022 12/22/2022 B - Approved as noted Answered
NA P 12/26/2022 12/22/2022 B - Approved as noted Answered
TT A 12/22/2022 12/21/2022 B - Approved as noted Answered
SA LC 12/22/2022 12/21/2022 B - Approved as noted Answered
SA LC 12/22/2022 12/21/2022 B - Approved as noted Answered
AG C 12/22/2022 12/21/2022 B - Approved as noted Answered
WG C 12/27/2022 12/21/2022 B - Approved as noted Answered
PG S 12/22/2022 12/21/2022 B - Approved as noted Answered
TT E 12/22/2022 12/21/2022 B - Approved as noted Answered
TG S 12/22/2022 12/21/2022 B - Approved as noted Answered
SW E 12/21/2022 12/20/2022 B - Approved as noted Answered
SW E 12/20/2022 12/19/2022 B - Approved as noted Answered
SW E 12/20/2022 12/19/2022 C - Revise & Resubmit Answered
TB E 12/22/2022 12/21/2022 C - Revise & Resubmit Answered
TG SU 12/22/2022 12/21/2022 B - Approved as noted Answered
EC SU 12/22/2022 12/21/2022 B - Approved as noted Answered
EC SU 12/22/2022 12/21/2022 B - Approved as noted Answered
CF SU 12/22/2022 12/21/2022 B - Approved as noted Answered
CO SU 12/22/2022 12/21/2022 B - Approved as noted Answered
CO SU 12/22/2022 12/21/2022 B - Approved as noted Answered
CO SU 12/22/2022 12/21/2022 B - Approved as noted Answered
NA SU 12/22/2022 12/21/2022 B - Approved as noted Answered
CO A 12/22/2022 12/21/2022 B - Approved as noted Answered
CO A 12/22/2022 12/21/2022 B - Approved as noted Answered
CO C 12/22/2022 12/21/2022 B - Approved as noted Answered
CO S 12/22/2022 12/21/2022 B - Approved as noted Answered
EC S 12/22/2022 12/21/2022 B - Approved as noted Answered
EC S 12/22/2022 12/21/2022 B - Approved as noted Answered
EC S 12/22/2022 12/21/2022 B - Approved as noted Answered
EC S 12/22/2022 12/21/2022 B - Approved as noted Answered
CO S 12/22/2022 12/21/2022 B - Approved as noted Answered
CO S 12/22/2022 12/21/2022 B - Approved as noted Answered
CO S 12/22/2022 12/21/2022 B - Approved as noted Answered
CO S 12/22/2022 12/21/2022 B - Approved as noted Answered
CF S 12/22/2022 12/21/2022 B - Approved as noted Answered
CO S 12/22/2022 12/21/2022 B - Approved as noted Answered
CO S 12/22/2022 12/21/2022 B - Approved as noted Answered
NA S 12/22/2022 12/21/2022 B - Approved as noted Answered
CO S 12/22/2022 12/21/2022 B - Approved as noted Answered
CO S 12/22/2022 12/21/2022 B - Approved as noted Answered
CO S 12/22/2022 12/21/2022 B - Approved as noted Answered
NA S 12/22/2022 12/21/2022 B - Approved as noted Answered
SA S 12/22/2022 12/21/2022 B - Approved as noted Answered
SW LS 12/22/2022 12/21/2022 B - Approved as noted Answered
SW C 12/22/2022 12/21/2022 B - Approved as noted Answered
SW C 12/22/2022 12/21/2022 B - Approved as noted Answered
TT LC 12/17/2022 12/15/2022 C - Revise & Resubmit Answered
SW C 12/22/2022 12/21/2022 B - Approved as noted Answered
SW C 12/22/2022 12/21/2022 C - Revise & Resubmit Answered
SW C 12/22/2022 12/21/2022 C - Revise & Resubmit Answered
SW C 12/22/2022 12/21/2022 B - Approved as noted Answered
SW C 12/22/2022 12/21/2022 B - Approved as noted Answered
SW C 12/22/2022 12/21/2022 B - Approved as noted Answered
SW C 12/22/2022 12/21/2022 C - Revise & Resubmit Answered
SW C 12/22/2022 12/21/2022 C - Revise & Resubmit Answered
SW C 12/22/2022 12/21/2022 B - Approved as noted Answered
SW C 12/22/2022 12/21/2022 C - Revise & Resubmit Answered
SW C 12/22/2022 12/21/2022 B - Approved as noted Answered
SW C 12/22/2022 12/21/2022 B - Approved as noted Answered
SW C 12/22/2022 12/21/2022 B - Approved as noted Answered
SW C 12/22/2022 12/21/2022 B - Approved as noted Answered
SW M 12/26/2022 12/21/2022 C - Revise & Resubmit Answered
SW M 12/26/2022 12/21/2022 B - Approved as noted Answered
SW C 12/22/2022 12/21/2022 B - Approved as noted Answered
SW LS 12/22/2022 12/21/2022 B - Approved as noted Answered
SW C 11/17/2022 11/16/2022 B - Approved as noted Answered
SW C 12/17/2022 12/15/2022 B - Approved as noted Answered
MC S 12/21/2022 12/20/2022 B - Approved as noted Answered
CO S 12/21/2022 12/20/2022 B - Approved as noted Answered
CO S 12/21/2022 12/20/2022 B - Approved as noted Answered
CO S 12/21/2022 12/20/2022 B - Approved as noted Answered
SA S 12/21/2022 12/20/2022 B - Approved as noted Answered
NA S 12/21/2022 12/20/2022 B - Approved as noted Answered
CO S 12/21/2022 12/20/2022 B - Approved as noted Answered
CO S 12/21/2022 12/20/2022 B - Approved as noted Answered
CO S 12/21/2022 12/20/2022 B - Approved as noted Answered
CO S 12/21/2022 12/20/2022 B - Approved as noted Answered
CO S 12/21/2022 12/20/2022 B - Approved as noted Answered
CO S 12/21/2022 12/20/2022 B - Approved as noted Answered
CO S 12/21/2022 12/20/2022 B - Approved as noted Answered
CO S 12/21/2022 12/20/2022 B - Approved as noted Answered
CO S 12/21/2022 12/20/2022 B - Approved as noted Answered
CO S 12/21/2022 12/20/2022 C - Revise & Resubmit Answered
CF S 12/21/2022 12/20/2022 B - Approved as noted Answered
NA S 12/21/2022 12/20/2022 B - Approved as noted Answered
CC S 12/21/2022 12/20/2022 B - Approved as noted Answered
CO S 12/21/2022 12/20/2022 B - Approved as noted Answered
CO S 12/21/2022 12/20/2022 B - Approved as noted Answered
CO C 12/21/2022 12/20/2022 B - Approved as noted Answered
EC C 12/21/2022 12/20/2022 B - Approved as noted Answered
PA C 12/21/2022 12/20/2022 B - Approved as noted Answered
MC C 12/21/2022 12/20/2022 B - Approved as noted Answered
MC C 12/21/2022 12/20/2022 B - Approved as noted Answered
CO SU 12/21/2022 12/20/2022 B - Approved as noted Answered
NA SU 12/21/2022 12/20/2022 B - Approved as noted Answered
CO SU 12/21/2022 12/20/2022 B - Approved as noted Answered
SW C 12/21/2022 12/20/2022 B - Approved as noted Answered
SW C 12/21/2022 12/20/2022 B - Approved as noted Answered
SW C 12/21/2022 12/20/2022 B - Approved as noted Answered
SW C 12/21/2022 12/20/2022 C - Revise & Resubmit Answered
SW C 12/21/2022 12/20/2022 B - Approved as noted Answered
SW C 12/21/2022 12/20/2022 B - Approved as noted Answered
SW C 12/21/2022 12/20/2022 C - Revise & Resubmit Answered
SW C 12/21/2022 12/20/2022 B - Approved as noted Answered
SW C 12/21/2022 12/20/2022 B - Approved as noted Answered
SW C 12/21/2022 12/20/2022 B - Approved as noted Answered
SW C 12/21/2022 12/20/2022 B - Approved as noted Answered
SW C 12/21/2022 12/20/2022 B - Approved as noted Answered
SW C 12/21/2022 12/20/2022 B - Approved as noted Answered
CO SU 12/21/2022 12/20/2022 B - Approved as noted Answered
SW C 12/21/2022 12/20/2022 B - Approved as noted Answered
CO SU 12/21/2022 12/20/2022 B - Approved as noted Answered
SW C 12/21/2022 12/20/2022 B - Approved as noted Answered
SW C 12/21/2022 12/20/2022 B - Approved as noted Answered
CC SU 12/21/2022 12/20/2022 C - Revise & Resubmit Answered
SW C 12/21/2022 12/20/2022 B - Approved as noted Answered
SW C 12/21/2022 12/20/2022 B - Approved as noted Answered
SW C 12/24/2022 12/20/2022 B - Approved as noted Answered
SW C 12/24/2022 12/20/2022 B - Approved as noted Answered
SW C 12/21/2022 12/20/2022 B - Approved as noted Answered
CO SU 12/5/2022 12/4/2022 B - Approved as noted Answered
SW C 12/24/2022 12/20/2022 B - Approved as noted Answered
LM S 12/11/2022 12/6/2022 B - Approved as noted Answered
SW C 12/21/2022 12/20/2022 B - Approved as noted Answered
CO S 12/3/2022 12/3/2022 B - Approved as noted Answered
CO S 11/19/2022 11/19/2022 B - Approved as noted Answered
CO S 12/12/2022 12/11/2022 B - Approved as noted Answered
PA C 12/21/2022 12/20/2022 B - Approved as noted Answered
PA C 12/21/2022 12/20/2022 B - Approved as noted Answered
SW C 12/20/2022 12/19/2022 B - Approved as noted Answered
SW C 12/20/2022 12/19/2022 B - Approved as noted Answered
SW C 12/20/2022 12/19/2022 B - Approved as noted Answered
SW C 12/24/2022 12/24/2022 B - Approved as noted Answered
SW C 12/20/2022 12/19/2022 B - Approved as noted Answered
SW C 12/20/2022 12/19/2022 B - Approved as noted Answered
SW C 12/20/2022 12/19/2022 B - Approved as noted Answered
SW C 12/20/2022 12/19/2022 B - Approved as noted Answered
SW C 12/20/2022 12/19/2022 B - Approved as noted Answered
SW C 12/20/2022 12/19/2022 B - Approved as noted Answered
SW C 12/20/2022 12/19/2022 B - Approved as noted Answered
SW C 12/20/2022 12/19/2022 B - Approved as noted Answered
SW C 12/20/2022 12/19/2022 B - Approved as noted Answered
SW C 12/20/2022 12/19/2022 B - Approved as noted Answered
SW C 12/20/2022 12/19/2022 B - Approved as noted Answered
SW C 12/20/2022 12/19/2022 B - Approved as noted Answered
SW C 12/20/2022 12/19/2022 B - Approved as noted Answered
SW C 12/20/2022 12/19/2022 B - Approved as noted Answered
SW C 12/20/2022 12/19/2022 B - Approved as noted Answered
SW LS 12/19/2022 12/18/2022 B - Approved as noted Answered
SW LS 12/19/2022 12/18/2022 B - Approved as noted Answered
SW C 12/20/2022 12/19/2022 B - Approved as noted Answered
SW LS 12/19/2022 12/18/2022 B - Approved as noted Answered
SW C 12/20/2022 12/19/2022 B - Approved as noted Answered
SW LS 12/19/2022 12/18/2022 B - Approved as noted Answered
SW C 12/19/2022 12/18/2022 B - Approved as noted Answered
SW C 12/19/2022 12/18/2022 B - Approved as noted Answered
SW C 12/19/2022 12/18/2022 B - Approved as noted Answered
SW C 12/19/2022 12/18/2022 C - Revise & Resubmit Answered
SW C 12/19/2022 12/18/2022 B - Approved as noted Answered
SW C 12/19/2022 12/18/2022 B - Approved as noted Answered
SW C 12/19/2022 12/18/2022 B - Approved as noted Answered
SW C 12/20/2022 12/19/2022 B - Approved as noted Answered
SW C 12/20/2022 12/19/2022 B - Approved as noted Answered
SW C 12/20/2022 12/19/2022 B - Approved as noted Answered
PA C 12/20/2022 12/19/2022 B - Approved as noted Answered
SW C 12/19/2022 12/18/2022 C - Revise & Resubmit Answered
SW C 12/19/2022 12/18/2022 B - Approved as noted Answered
SW C 12/19/2022 12/18/2022 B - Approved as noted Answered
SW C 12/19/2022 12/18/2022 B - Approved as noted Answered
SW C 12/19/2022 12/18/2022 B - Approved as noted Answered
SW C 12/19/2022 12/18/2022 B - Approved as noted Answered
SW C 12/20/2022 12/19/2022 B - Approved as noted Answered
SW C 12/19/2022 12/18/2022 B - Approved as noted Answered
SW C 12/19/2022 12/18/2022 B - Approved as noted Answered
SW C 12/19/2022 12/18/2022 B - Approved as noted Answered
SW C 12/19/2022 12/18/2022 B - Approved as noted Answered
SW C 12/19/2022 12/18/2022 B - Approved as noted Answered
SW C 12/19/2022 12/18/2022 B - Approved as noted Answered
SW C 12/19/2022 12/18/2022 B - Approved as noted Answered
SW C 12/19/2022 12/18/2022 B - Approved as noted Answered
PA C 12/19/2022 12/18/2022 B - Approved as noted Answered
SW C 12/18/2022 12/17/2022 B - Approved as noted Answered
SW C 12/18/2022 12/17/2022 B - Approved as noted Answered
SW C 12/18/2022 12/17/2022 B - Approved as noted Answered
SW C 12/18/2022 12/17/2022 B - Approved as noted Answered
SW C 12/18/2022 12/17/2022 B - Approved as noted Answered
WG C 12/21/2022 12/20/2022 B - Approved as noted Answered
WG C 12/27/2022 12/20/2022 C - Revise & Resubmit Answered
WG C 12/21/2022 12/20/2022 B - Approved as noted Answered
WG C 12/21/2022 12/20/2022 B - Approved as noted Answered
SW C 12/18/2022 12/17/2022 C - Revise & Resubmit Answered
PG S 12/21/2022 12/20/2022 B - Approved as noted Answered
SW C 12/18/2022 12/17/2022 B - Approved as noted Answered
SW C 12/18/2022 12/17/2022 C - Revise & Resubmit Answered
PG S 12/21/2022 12/20/2022 B - Approved as noted Answered
SW C 12/24/2022 12/17/2022 B - Approved as noted Answered
WG SU 12/21/2022 12/20/2022 B - Approved as noted Answered
PG SU 12/21/2022 12/20/2022 B - Approved as noted Answered
PG SU 12/21/2022 12/20/2022 B - Approved as noted Answered
DG LS 12/20/2022 12/19/2022 B - Approved as noted Answered
TG S 12/20/2022 12/19/2022 B - Approved as noted Answered
PG C 12/20/2022 12/19/2022 C - Revise & Resubmit Answered
PG C 12/20/2022 12/19/2022 B - Approved as noted Answered
PG C 12/20/2022 12/19/2022 C - Revise & Resubmit Answered
PG C 12/20/2022 12/19/2022 B - Approved as noted Answered
PG C 12/20/2022 12/19/2022 B - Approved as noted Answered
WG C 12/20/2022 12/19/2022 B - Approved as noted Answered
WG C 12/20/2022 12/19/2022 B - Approved as noted Answered
PG C 12/20/2022 12/19/2022 B - Approved as noted Answered
PG C 12/20/2022 12/19/2022 B - Approved as noted Answered
WG C 12/21/2022 12/20/2022 B - Approved as noted Answered
TG E 12/20/2022 12/19/2022 C - Revise & Resubmit Answered
TG E 12/20/2022 12/19/2022 B - Approved as noted Answered
SW M 12/21/2022 12/20/2022 B - Approved as noted Answered
SW M 12/21/2022 12/20/2022 B - Approved as noted Answered
CO S 12/20/2022 12/19/2022 B - Approved as noted Answered
CO S 12/20/2022 12/19/2022 B - Approved as noted Answered
SM SU 12/20/2022 12/19/2022 B - Approved as noted Answered
CO SU 12/20/2022 12/19/2022 B - Approved as noted Answered
NA SU 12/20/2022 12/19/2022 B - Approved as noted Answered
CO SU 12/20/2022 12/19/2022 C - Revise & Resubmit Answered
CO SU 12/20/2022 12/19/2022 B - Approved as noted Answered
MC S 12/20/2022 12/19/2022 B - Approved as noted Answered
CO S 12/20/2022 12/19/2022 C - Revise & Resubmit Answered
CO S 12/20/2022 12/19/2022 C - Revise & Resubmit Answered
CO S 12/20/2022 12/19/2022 B - Approved as noted Answered
SM S 12/20/2022 12/19/2022 B - Approved as noted Answered
SM S 12/20/2022 12/19/2022 B - Approved as noted Answered
CO S 12/20/2022 12/19/2022 B - Approved as noted Answered
LM S 12/20/2022 12/19/2022 C - Revise & Resubmit Answered
CO S 12/20/2022 12/19/2022 B - Approved as noted Answered
NA S 12/20/2022 12/19/2022 B - Approved as noted Answered
CO S 12/20/2022 12/19/2022 B - Approved as noted Answered
CO S 12/20/2022 12/19/2022 B - Approved as noted Answered
CO S 12/20/2022 12/19/2022 B - Approved as noted Answered
CO S 12/20/2022 12/19/2022 B - Approved as noted Answered
CO S 12/20/2022 12/19/2022 B - Approved as noted Answered
CO S 12/20/2022 12/19/2022 B - Approved as noted Answered
NA S 12/20/2022 12/19/2022 B - Approved as noted Answered
CO S 12/20/2022 12/19/2022 C - Revise & Resubmit Answered
CO S 12/20/2022 12/19/2022 B - Approved as noted Answered
SM S 12/20/2022 12/19/2022 B - Approved as noted Answered
CO S 12/20/2022 12/19/2022 B - Approved as noted Answered
CO S 12/20/2022 12/19/2022 B - Approved as noted Answered
CO S 12/20/2022 12/19/2022 B - Approved as noted Answered
CO S 12/20/2022 12/19/2022 B - Approved as noted Answered
MC S 12/20/2022 12/19/2022 B - Approved as noted Answered
MC S 12/20/2022 12/19/2022 B - Approved as noted Answered
MC S 12/20/2022 12/19/2022 B - Approved as noted Answered
LM E 12/18/2022 12/18/2022 B - Approved as noted Answered
PG E 12/19/2022 12/15/2022 C - Revise & Resubmit Answered
PG E 12/17/2022 12/15/2022 B - Approved as noted Answered
SW E 12/14/2022 12/13/2022 B - Approved as noted Answered
PG E 12/13/2022 12/12/2022 B - Approved as noted Answered
PG E 12/13/2022 12/12/2022 B - Approved as noted Answered
TT E 12/21/2022 12/20/2022 B - Approved as noted Answered
LM LC 12/20/2022 12/19/2022 B - Approved as noted Answered
TT LC 12/17/2022 12/15/2022 C - Revise & Resubmit Answered
TT LC 12/17/2022 12/15/2022 C - Revise & Resubmit Answered
WG C 12/20/2022 12/19/2022 B - Approved as noted Answered
WG C 12/24/2022 12/19/2022 B - Approved as noted Answered
SW LS 12/20/2022 12/19/2022 B - Approved as noted Answered
PG C 12/20/2022 12/19/2022 B - Approved as noted Answered
CC P 12/20/2022 12/19/2022 B - Approved as noted Answered
WG P 12/20/2022 12/19/2022 B - Approved as noted Answered
SW M 12/20/2022 12/19/2022 B - Approved as noted Answered
SW P 12/19/2022 12/18/2022 B - Approved as noted Answered
SW E 12/15/2022 12/14/2022 B - Approved as noted Answered
SW E 12/19/2022 12/18/2022 B - Approved as noted Answered
SW E 12/19/2022 12/18/2022 B - Approved as noted Answered
SW E 12/19/2022 12/18/2022 B - Approved as noted Answered
SW E 12/19/2022 12/18/2022 B - Approved as noted Answered
SW E 12/19/2022 12/18/2022 B - Approved as noted Answered
SW E 12/19/2022 12/18/2022 B - Approved as noted Answered
TG S 12/19/2022 12/18/2022 B - Approved as noted Answered
DG LS 12/19/2022 12/18/2022 B - Approved as noted Answered
CO A 12/17/2022 12/15/2022 C - Revise & Resubmit Answered
CO A 12/17/2022 12/15/2022 C - Revise & Resubmit Answered
PC E 12/17/2022 12/15/2022 B - Approved as noted Answered
TG C 12/19/2022 12/18/2022 B - Approved as noted Answered
TG C 12/19/2022 12/18/2022 B - Approved as noted Answered
WG C 12/24/2022 12/18/2022 B - Approved as noted Answered
WG C 12/19/2022 12/18/2022 B - Approved as noted Answered
DG C 12/19/2022 12/18/2022 B - Approved as noted Answered
WG C 12/19/2022 12/18/2022 B - Approved as noted Answered
WG C 12/19/2022 12/18/2022 B - Approved as noted Answered
WG C 12/19/2022 12/18/2022 B - Approved as noted Answered
WG C 12/19/2022 12/18/2022 B - Approved as noted Answered
PG C 12/19/2022 12/18/2022 B - Approved as noted Answered
PG C 12/19/2022 12/18/2022 B - Approved as noted Answered
WG C 12/18/2022 12/17/2022 B - Approved as noted Answered
MC C 12/19/2022 12/18/2022 B - Approved as noted Answered
CO C 12/19/2022 12/18/2022 B - Approved as noted Answered
CO C 12/19/2022 12/18/2022 B - Approved as noted Answered
MC C 12/19/2022 12/18/2022 B - Approved as noted Answered
LM SU 12/19/2022 12/18/2022 B - Approved as noted Answered
CO SU 12/19/2022 12/18/2022 B - Approved as noted Answered
MC SU 12/19/2022 12/18/2022 B - Approved as noted Answered
MC SU 12/19/2022 12/18/2022 B - Approved as noted Answered
CO SU 12/19/2022 12/18/2022 B - Approved as noted Answered
CO SU 12/19/2022 12/18/2022 B - Approved as noted Answered
MC S 12/19/2022 12/18/2022 C - Revise & Resubmit Answered
MC S 12/19/2022 12/18/2022 B - Approved as noted Answered
LM S 12/19/2022 12/18/2022 C - Revise & Resubmit Answered
MC S 12/19/2022 12/18/2022 C - Revise & Resubmit Answered
MC S 12/19/2022 12/18/2022 C - Revise & Resubmit Answered
CO S 12/19/2022 12/18/2022 B - Approved as noted Answered
CO S 12/19/2022 12/18/2022 B - Approved as noted Answered
CO S 12/19/2022 12/18/2022 B - Approved as noted Answered
CO S 12/19/2022 12/18/2022 B - Approved as noted Answered
CO S 12/19/2022 12/18/2022 B - Approved as noted Answered
MC S 12/19/2022 12/18/2022 B - Approved as noted Answered
MC S 12/19/2022 12/18/2022 B - Approved as noted Answered
MC S 12/19/2022 12/18/2022 B - Approved as noted Answered
CO S 12/19/2022 12/18/2022 B - Approved as noted Answered
CO S 12/19/2022 12/18/2022 B - Approved as noted Answered
CO S 12/19/2022 12/18/2022 B - Approved as noted Answered
LM S 12/19/2022 12/18/2022 C - Revise & Resubmit Answered
NA S 12/19/2022 12/18/2022 B - Approved as noted Answered
CO S 12/19/2022 12/18/2022 B - Approved as noted Answered
CO S 12/19/2022 12/18/2022 B - Approved as noted Answered
CO S 12/19/2022 12/18/2022 B - Approved as noted Answered
CO SU 12/18/2022 12/17/2022 B - Approved as noted Answered
EC SU 12/18/2022 12/17/2022 B - Approved as noted Answered
CF SU 12/19/2022 12/18/2022 B - Approved as noted Answered
CO SU 12/18/2022 12/17/2022 B - Approved as noted Answered
CO C 12/18/2022 12/17/2022 B - Approved as noted Answered
MC C 12/18/2022 12/17/2022 B - Approved as noted Answered
CO S 12/18/2022 12/17/2022 B - Approved as noted Answered
CO S 12/18/2022 12/17/2022 B - Approved as noted Answered
CO S 12/18/2022 12/17/2022 B - Approved as noted Answered
EC S 12/18/2022 12/17/2022 B - Approved as noted Answered
CO S 12/18/2022 12/17/2022 B - Approved as noted Answered
CF S 12/18/2022 12/17/2022 B - Approved as noted Answered
CF S 12/18/2022 12/17/2022 B - Approved as noted Answered
CO S 12/18/2022 12/17/2022 B - Approved as noted Answered
CO S 12/18/2022 12/17/2022 B - Approved as noted Answered
CO S 12/18/2022 12/17/2022 B - Approved as noted Answered
CO S 12/18/2022 12/17/2022 B - Approved as noted Answered
CO S 12/18/2022 12/17/2022 B - Approved as noted Answered
CO S 12/18/2022 12/17/2022 B - Approved as noted Answered
CO S 12/18/2022 12/17/2022 C - Revise & Resubmit Answered
MC C 12/17/2022 12/15/2022 B - Approved as noted Answered
EC C 12/17/2022 12/15/2022 B - Approved as noted Answered
EC C 12/17/2022 12/15/2022 B - Approved as noted Answered
SW C 12/14/2022 12/13/2022 B - Approved as noted Answered
SW P 12/19/2022 12/18/2022 B - Approved as noted Answered
SW M 12/19/2022 12/18/2022 B - Approved as noted Answered
TG LC 12/19/2022 12/19/2022 C - Revise & Resubmit Answered
TG LC 12/19/2022 12/19/2022 C - Revise & Resubmit Answered
GC LC 12/18/2022 12/17/2022 C - Revise & Resubmit Answered
SW C 12/19/2022 12/18/2022 B - Approved as noted Answered
SW C 12/19/2022 12/18/2022 B - Approved as noted Answered
GC LC 12/18/2022 12/17/2022 C - Revise & Resubmit Answered
PC LC 12/17/2022 12/15/2022 B - Approved as noted Answered
SW E 12/17/2022 12/15/2022 B - Approved as noted Answered
SW E 12/15/2022 12/14/2022 B - Approved as noted Answered
CO SU 12/17/2022 12/15/2022 B - Approved as noted Answered
EC SU 12/17/2022 12/15/2022 B - Approved as noted Answered
CO SU 12/17/2022 12/15/2022 B - Approved as noted Answered
CO SU 12/17/2022 12/15/2022 C - Revise & Resubmit Answered
EC S 12/17/2022 12/15/2022 B - Approved as noted Answered
EC SU 12/17/2022 12/15/2022 B - Approved as noted Answered
NA SU 12/17/2022 12/15/2022 B - Approved as noted Answered
CO S 12/17/2022 12/15/2022 C - Revise & Resubmit Answered
CO S 12/17/2022 12/15/2022 B - Approved as noted Answered
CO S 12/17/2022 12/15/2022 B - Approved as noted Answered
TT LC 12/15/2022 12/14/2022 B - Approved as noted Answered
MC S 12/17/2022 12/15/2022 B - Approved as noted Answered
MC S 12/17/2022 12/15/2022 B - Approved as noted Answered
CO S 12/17/2022 12/15/2022 B - Approved as noted Answered
CO S 12/17/2022 12/15/2022 C - Revise & Resubmit Answered
NA S 12/17/2022 12/15/2022 B - Approved as noted Answered
CO S 12/17/2022 12/15/2022 B - Approved as noted Answered
CO S 12/17/2022 12/15/2022 B - Approved as noted Answered
EC S 12/17/2022 12/15/2022 B - Approved as noted Answered
TT LC 12/14/2022 12/13/2022 B - Approved as noted Answered
EC S 12/17/2022 12/15/2022 B - Approved as noted Answered
PC S 12/17/2022 12/15/2022 B - Approved as noted Answered
PC S 12/17/2022 12/15/2022 B - Approved as noted Answered
TT LC 12/14/2022 12/13/2022 B - Approved as noted Answered
PC LC 12/14/2022 12/13/2022 B - Approved as noted Answered
WG SU 12/17/2022 12/15/2022 B - Approved as noted Answered
NA LC 12/14/2022 12/13/2022 B - Approved as noted Answered
NA LC 12/14/2022 12/13/2022 B - Approved as noted Answered
NA LC 12/14/2022 12/13/2022 B - Approved as noted Answered
SW LC 12/14/2022 12/13/2022 C - Revise & Resubmit Answered
SW LC 12/14/2022 12/13/2022 C - Revise & Resubmit Answered
SW M 12/19/2022 12/15/2022 B - Approved as noted Answered
SW LS 12/18/2022 12/15/2022 B - Approved as noted Answered
SW LS 12/18/2022 12/15/2022 B - Approved as noted Answered
SW LS 12/18/2022 12/15/2022 B - Approved as noted Answered
SW C 12/17/2022 12/15/2022 B - Approved as noted Answered
SW C 12/17/2022 12/15/2022 B - Approved as noted Answered
SW C 12/17/2022 12/15/2022 B - Approved as noted Answered
SW C 12/17/2022 12/15/2022 B - Approved as noted Answered
SW C 12/17/2022 12/15/2022 B - Approved as noted Answered
SW C 12/17/2022 12/15/2022 B - Approved as noted Answered
SW C 12/17/2022 12/15/2022 B - Approved as noted Answered
SW C 12/17/2022 12/15/2022 B - Approved as noted Answered
SW C 12/17/2022 12/15/2022 B - Approved as noted Answered
SW C 12/17/2022 12/15/2022 B - Approved as noted Answered
SW C 12/17/2022 12/15/2022 B - Approved as noted Answered
SW C 12/17/2022 12/15/2022 B - Approved as noted Answered
SW C 12/17/2022 12/15/2022 B - Approved as noted Answered
SW C 12/17/2022 12/15/2022 B - Approved as noted Answered
SW C 12/17/2022 12/15/2022 B - Approved as noted Answered
SW C 12/17/2022 12/15/2022 B - Approved as noted Answered
SW C 12/17/2022 12/15/2022 B - Approved as noted Answered
SW C 12/17/2022 12/15/2022 B - Approved as noted Answered
SW C 12/17/2022 12/15/2022 B - Approved as noted Answered
SW C 12/17/2022 12/15/2022 B - Approved as noted Answered
SW C 12/15/2022 12/14/2022 B - Approved as noted Answered
SW C 12/15/2022 12/14/2022 C - Revise & Resubmit Answered
SW C 12/15/2022 12/14/2022 B - Approved as noted Answered
SW C 12/15/2022 12/14/2022 B - Approved as noted Answered
SW C 12/15/2022 12/14/2022 B - Approved as noted Answered
SW C 12/15/2022 12/14/2022 B - Approved as noted Answered
SW C 12/15/2022 12/14/2022 B - Approved as noted Answered
SW C 12/15/2022 12/14/2022 B - Approved as noted Answered
SW C 12/15/2022 12/14/2022 B - Approved as noted Answered
SW LS 12/18/2022 12/13/2022 B - Approved as noted Answered
SW LS 12/18/2022 12/13/2022 B - Approved as noted Answered
SW C 12/14/2022 12/13/2022 B - Approved as noted Answered
SW C 12/14/2022 12/13/2022 B - Approved as noted Answered
SW C 12/14/2022 12/13/2022 B - Approved as noted Answered
SW C 12/14/2022 12/13/2022 B - Approved as noted Answered
SW C 12/14/2022 12/13/2022 B - Approved as noted Answered
SW C 12/14/2022 12/13/2022 C - Revise & Resubmit Answered
SW C 12/14/2022 12/13/2022 B - Approved as noted Answered
SW C 12/14/2022 12/13/2022 B - Approved as noted Answered
SW C 12/14/2022 12/13/2022 B - Approved as noted Answered
SW C 12/14/2022 12/13/2022 B - Approved as noted Answered
SW C 12/14/2022 12/13/2022 B - Approved as noted Answered
SW C 12/14/2022 12/13/2022 B - Approved as noted Answered
SW C 12/14/2022 12/13/2022 C - Revise & Resubmit Answered
SW C 12/14/2022 12/13/2022 C - Revise & Resubmit Answered
SW C 12/14/2022 12/13/2022 B - Approved as noted Answered
SW C 12/14/2022 12/13/2022 B - Approved as noted Answered
SW C 12/14/2022 12/13/2022 B - Approved as noted Answered
SW C 12/13/2022 12/12/2022 B - Approved as noted Answered
SW C 12/13/2022 12/12/2022 B - Approved as noted Answered
SW C 12/13/2022 12/12/2022 B - Approved as noted Answered
SW C 12/13/2022 12/12/2022 B - Approved as noted Answered
SW C 12/13/2022 12/12/2022 B - Approved as noted Answered
SW C 12/13/2022 12/12/2022 B - Approved as noted Answered
SW C 12/13/2022 12/12/2022 B - Approved as noted Answered
SW C 12/13/2022 12/12/2022 B - Approved as noted Answered
SW C 12/13/2022 12/12/2022 C - Revise & Resubmit Answered
SW C 12/13/2022 12/12/2022 B - Approved as noted Answered
SW C 12/13/2022 12/12/2022 B - Approved as noted Answered
SW C 12/13/2022 12/12/2022 B - Approved as noted Answered
SW C 12/13/2022 12/12/2022 B - Approved as noted Answered
CO S 12/17/2022 12/15/2022 B - Approved as noted Answered
CO S 12/17/2022 12/15/2022 B - Approved as noted Answered
SM S 12/15/2022 12/14/2022 C - Revise & Resubmit Answered
NA S 12/15/2022 12/14/2022 B - Approved as noted Answered
CO SU 12/15/2022 12/14/2022 B - Approved as noted Answered
CO SU 12/15/2022 12/14/2022 B - Approved as noted Answered
WG C 12/17/2022 12/15/2022 B - Approved as noted Answered
DG C 12/17/2022 12/15/2022 B - Approved as noted Answered
WG C 12/17/2022 12/15/2022 B - Approved as noted Answered
PG C 12/17/2022 12/15/2022 B - Approved as noted Answered
MB S 12/17/2022 12/15/2022 B - Approved as noted Answered
PG S 12/17/2022 12/15/2022 C - Revise & Resubmit Answered
PG S 12/17/2022 12/15/2022 B - Approved as noted Answered
PG LS 12/19/2022 12/15/2022 B - Approved as noted Answered
PG LS 12/19/2022 12/15/2022 B - Approved as noted Answered
DG C 12/15/2022 12/14/2022 C - Revise & Resubmit Answered
PG C 12/15/2022 12/14/2022 B - Approved as noted Answered
WG C 12/15/2022 12/14/2022 C - Revise & Resubmit Answered
WG C 12/15/2022 12/14/2022 B - Approved as noted Answered
WG C 12/15/2022 12/14/2022 B - Approved as noted Answered
FC A 12/15/2022 12/14/2022 B - Approved as noted Answered
WG LS 12/19/2022 12/14/2022 B - Approved as noted Answered
SW C 12/11/2022 12/10/2022 B - Approved as noted Answered
SW C 12/11/2022 12/10/2022 B - Approved as noted Answered
SW C 12/11/2022 12/10/2022 B - Approved as noted Answered
SW C 12/11/2022 12/10/2022 B - Approved as noted Answered
SW C 12/11/2022 12/10/2022 C - Revise & Resubmit Answered
SW C 12/11/2022 12/10/2022 C - Revise & Resubmit Answered
SW C 12/11/2022 12/10/2022 B - Approved as noted Answered
SW C 12/11/2022 12/10/2022 B - Approved as noted Answered
SW C 12/11/2022 12/10/2022 C - Revise & Resubmit Answered
PG C 12/17/2022 12/15/2022 B - Approved as noted Answered
WG SU 12/14/2022 12/13/2022 B - Approved as noted Answered
SW C 12/17/2022 12/15/2022 B - Approved as noted Answered
WG C 12/14/2022 12/13/2022 B - Approved as noted Answered
SW C 12/17/2022 12/15/2022 B - Approved as noted Answered
WG C 12/14/2022 12/13/2022 B - Approved as noted Answered
WG C 12/18/2022 12/13/2022 B - Approved as noted Answered
WG C 12/14/2022 12/13/2022 B - Approved as noted Answered
WG C 12/14/2022 12/13/2022 B - Approved as noted Answered
PG C 12/14/2022 12/13/2022 B - Approved as noted Answered
PG C 12/14/2022 12/13/2022 B - Approved as noted Answered
WG P 12/17/2022 12/15/2022 B - Approved as noted Answered
PG C 12/14/2022 12/13/2022 B - Approved as noted Answered
TB S 12/14/2022 12/13/2022 B - Approved as noted Answered
SW M 12/17/2022 12/15/2022 B - Approved as noted Answered
PG LC 12/13/2022 12/12/2022 B - Approved as noted Answered
PG LC 12/13/2022 12/12/2022 B - Approved as noted Answered
TB SU 12/14/2022 12/13/2022 B - Approved as noted Answered
CC S 12/15/2022 12/14/2022 B - Approved as noted Answered
CO S 12/15/2022 12/14/2022 B - Approved as noted Answered
CO S 12/15/2022 12/14/2022 B - Approved as noted Answered
CO S 12/15/2022 12/14/2022 B - Approved as noted Answered
CO S 12/15/2022 12/14/2022 B - Approved as noted Answered
CO S 12/14/2022 12/13/2022 B - Approved as noted Answered
CG C 12/14/2022 12/13/2022 B - Approved as noted Answered
MC C 12/14/2022 12/13/2022 B - Approved as noted Answered
CO SU 12/14/2022 12/13/2022 B - Approved as noted Answered
EC SU 12/14/2022 12/13/2022 B - Approved as noted Answered
MC SU 12/14/2022 12/13/2022 B - Approved as noted Answered
EC SU 12/14/2022 12/13/2022 B - Approved as noted Answered
CO SU 12/14/2022 12/13/2022 B - Approved as noted Answered
CF SU 12/14/2022 12/13/2022 B - Approved as noted Answered
CO S 12/15/2022 12/14/2022 B - Approved as noted Answered
CF S 12/14/2022 12/13/2022 B - Approved as noted Answered
CO S 12/14/2022 12/13/2022 B - Approved as noted Answered
EC S 12/14/2022 12/13/2022 B - Approved as noted Answered
EC S 12/14/2022 12/13/2022 B - Approved as noted Answered
CO S 12/14/2022 12/13/2022 B - Approved as noted Answered
CO S 12/14/2022 12/13/2022 B - Approved as noted Answered
EC S 12/15/2022 12/14/2022 B - Approved as noted Answered
EC S 12/14/2022 12/13/2022 B - Approved as noted Answered
MC S 12/14/2022 12/13/2022 B - Approved as noted Answered
MC S 12/14/2022 12/14/2022 B - Approved as noted Answered
EC S 12/14/2022 12/13/2022 B - Approved as noted Answered
CO S 12/14/2022 12/13/2022 C - Revise & Resubmit Answered
CO S 12/14/2022 12/13/2022 C - Revise & Resubmit Answered
CO S 12/14/2022 12/13/2022 B - Approved as noted Answered
CF S 12/14/2022 12/13/2022 B - Approved as noted Answered
CF S 12/14/2022 12/13/2022 B - Approved as noted Answered
CC S 12/14/2022 12/13/2022 B - Approved as noted Answered
WG LS 12/18/2022 12/12/2022 B - Approved as noted Answered
SW C 12/4/2022 12/3/2022 B - Approved as noted Answered
SW LS 12/12/2022 12/11/2022 B - Approved as noted Answered
SW LS 12/12/2022 12/11/2022 B - Approved as noted Answered
SW LS 12/17/2022 12/15/2022 B - Approved as noted Answered
SW LS 12/15/2022 12/14/2022 B - Approved as noted Answered
NA P 12/15/2022 12/14/2022 B - Approved as noted Answered
SW M 12/19/2022 12/14/2022 B - Approved as noted Answered
SW M 12/15/2022 12/14/2022 B - Approved as noted Answered
SW M 12/15/2022 12/14/2022 B - Approved as noted Answered
LM P 12/14/2022 12/13/2022 B - Approved as noted Answered
SW LS 12/12/2022 12/11/2022 B - Approved as noted Answered
SW LS 12/12/2022 12/11/2022 B - Approved as noted Answered
SW C 12/15/2022 12/11/2022 B - Approved as noted Answered
SW C 12/12/2022 12/11/2022 B - Approved as noted Answered
SW C 12/12/2022 12/11/2022 B - Approved as noted Answered
SW C 12/12/2022 12/11/2022 B - Approved as noted Answered
SW C 12/12/2022 12/11/2022 B - Approved as noted Answered
SW C 12/12/2022 12/11/2022 B - Approved as noted Answered
SW C 12/12/2022 12/11/2022 B - Approved as noted Answered
SW C 12/12/2022 12/11/2022 B - Approved as noted Answered
PA C 12/12/2022 12/11/2022 B - Approved as noted Answered
PA C 12/12/2022 12/11/2022 B - Approved as noted Answered
PA C 12/12/2022 12/11/2022 B - Approved as noted Answered
PA C 12/12/2022 12/11/2022 B - Approved as noted Answered
PA C 12/12/2022 12/11/2022 B - Approved as noted Answered
TG S 12/13/2022 12/12/2022 B - Approved as noted Answered
WG LS 12/18/2022 12/12/2022 B - Approved as noted Answered
WG LS 12/18/2022 12/12/2022 B - Approved as noted Answered
MB S 12/18/2022 12/11/2022 B - Approved as noted Answered
MB SU 12/12/2022 12/11/2022 B - Approved as noted Answered
MB SU 12/12/2022 12/11/2022 B - Approved as noted Answered
PG C 12/12/2022 12/11/2022 B - Approved as noted Answered
PG C 12/12/2022 12/11/2022 B - Approved as noted Answered
WG C 12/12/2022 12/11/2022 B - Approved as noted Answered
WG C 12/12/2022 12/11/2022 B - Approved as noted Answered
WG C 12/12/2022 12/11/2022 B - Approved as noted Answered
WG C 12/12/2022 12/11/2022 B - Approved as noted Answered
WG C 12/12/2022 12/11/2022 B - Approved as noted Answered
PC E 12/13/2022 12/12/2022 B - Approved as noted Answered
PC E 12/8/2022 12/7/2022 B - Approved as noted Answered
PC LC 12/13/2022 12/12/2022 B - Approved as noted Answered
RG LC 12/13/2022 12/12/2022 B - Approved as noted Answered
RG LC 12/13/2022 12/12/2022 B - Approved as noted Answered
PC LC 12/13/2022 12/12/2022 B - Approved as noted Answered
NA LC 12/13/2022 12/12/2022 B - Approved as noted Answered
EC C 12/7/2022 12/6/2022 B - Approved as noted Answered
WG P 12/14/2022 12/13/2022 C - Revise & Resubmit Answered
SW M 12/13/2022 12/12/2022 B - Approved as noted Answered
SW M 12/13/2022 12/12/2022 B - Approved as noted Answered
NA LC 12/12/2022 12/11/2022 B - Approved as noted Answered
NA LC 12/12/2022 12/11/2022 B - Approved as noted Answered
NA LC 12/12/2022 12/11/2022 B - Approved as noted Answered
TB E 12/12/2022 12/11/2022 B - Approved as noted Answered
CO SU 12/13/2022 12/12/2022 B - Approved as noted Answered
MC SU 12/13/2022 12/12/2022 C - Revise & Resubmit Answered
CO SU 12/13/2022 12/12/2022 B - Approved as noted Answered
PC C 12/13/2022 12/12/2022 B - Approved as noted Answered
MC C 12/13/2022 12/12/2022 B - Approved as noted Answered
CO S 12/13/2022 12/12/2022 B - Approved as noted Answered
CO S 12/13/2022 12/12/2022 B - Approved as noted Answered
MC S 12/13/2022 12/12/2022 C - Revise & Resubmit Answered
CO S 12/13/2022 12/12/2022 B - Approved as noted Answered
CO S 12/13/2022 12/12/2022 B - Approved as noted Answered
MC S 12/13/2022 12/12/2022 C - Revise & Resubmit Answered
CO S 12/13/2022 12/12/2022 B - Approved as noted Answered
MC S 12/13/2022 12/12/2022 C - Revise & Resubmit Answered
CO S 12/13/2022 12/12/2022 B - Approved as noted Answered
CO S 12/13/2022 12/12/2022 B - Approved as noted Answered
CO S 12/13/2022 12/12/2022 B - Approved as noted Answered
CO S 12/13/2022 12/12/2022 C - Revise & Resubmit Answered
CO S 12/13/2022 12/12/2022 B - Approved as noted Answered
LM SU 12/7/2022 12/6/2022 B - Approved as noted Answered
CO C 12/12/2022 12/11/2022 B - Approved as noted Answered
CO C 12/12/2022 12/11/2022 B - Approved as noted Answered
CO C 12/12/2022 12/11/2022 B - Approved as noted Answered
CO C 12/12/2022 12/11/2022 B - Approved as noted Answered
CO C 12/12/2022 12/11/2022 B - Approved as noted Answered
CC SU 12/12/2022 12/11/2022 B - Approved as noted Answered
CO SU 12/12/2022 12/11/2022 B - Approved as noted Answered
MC SU 12/12/2022 12/11/2022 B - Approved as noted Answered
CO SU 12/12/2022 12/11/2022 B - Approved as noted Answered
CO SU 12/12/2022 12/11/2022 B - Approved as noted Answered
CO SU 12/12/2022 12/11/2022 B - Approved as noted Answered
SW E 12/10/2022 12/8/2022 C - Revise & Resubmit Answered
SW E 12/10/2022 12/8/2022 C - Revise & Resubmit Answered
SW E 12/10/2022 12/8/2022 B - Approved as noted Answered
SW E 12/10/2022 12/8/2022 B - Approved as noted Answered
SM SU 12/12/2022 12/11/2022 B - Approved as noted Answered
SW E 12/10/2022 12/8/2022 B - Approved as noted Answered
CC S 12/12/2022 12/11/2022 B - Approved as noted Answered
MC S 12/12/2022 12/11/2022 B - Approved as noted Answered
MC S 12/12/2022 12/11/2022 B - Approved as noted Answered
CO S 12/13/2022 12/11/2022 B - Approved as noted Answered
CO S 12/12/2022 12/11/2022 B - Approved as noted Answered
CO S 12/12/2022 12/11/2022 B - Approved as noted Answered
CO S 12/12/2022 12/11/2022 B - Approved as noted Answered
CO S 12/12/2022 12/11/2022 B - Approved as noted Answered
CO S 12/12/2022 12/11/2022 B - Approved as noted Answered
CO S 12/12/2022 12/11/2022 B - Approved as noted Answered
CO S 12/12/2022 12/11/2022 C - Revise & Resubmit Answered
CO S 12/12/2022 12/11/2022 B - Approved as noted Answered
CO S 12/12/2022 12/11/2022 B - Approved as noted Answered
CO S 12/12/2022 12/11/2022 B - Approved as noted Answered
CO S 12/12/2022 12/11/2022 B - Approved as noted Answered
SW LS 12/13/2022 12/11/2022 B - Approved as noted Answered
CO S 12/12/2022 12/11/2022 B - Approved as noted Answered
CO S 12/12/2022 12/11/2022 B - Approved as noted Answered
CO S 12/12/2022 12/11/2022 B - Approved as noted Answered
NA S 12/12/2022 12/11/2022 B - Approved as noted Answered
CO S 12/12/2022 12/11/2022 B - Approved as noted Answered
PC LC 12/8/2022 12/7/2022 B - Approved as noted Answered
WG C 12/11/2022 12/10/2022 B - Approved as noted Answered
WG C 12/11/2022 12/10/2022 B - Approved as noted Answered
TT A 12/10/2022 12/8/2022 B - Approved as noted Answered
AG S 12/10/2022 12/8/2022 B - Approved as noted Answered
PG C 12/10/2022 12/8/2022 B - Approved as noted Answered
PG C 12/10/2022 12/8/2022 B - Approved as noted Answered
PG C 12/12/2022 12/8/2022 B - Approved as noted Answered
PG C 12/12/2022 12/8/2022 B - Approved as noted Answered
AG C 12/10/2022 12/8/2022 B - Approved as noted Answered
CO A 12/6/2022 12/5/2022 C - Revise & Resubmit Answered
PG E 12/6/2022 12/5/2022 C - Revise & Resubmit Answered
SW LC 12/7/2022 12/6/2022 B - Approved as noted Answered
SW LC 12/7/2022 12/6/2022 B - Approved as noted Answered
CO A 12/6/2022 12/5/2022 B - Approved as noted Answered
CO A 12/6/2022 12/5/2022 B - Approved as noted Answered
CO A 12/6/2022 12/5/2022 B - Approved as noted Answered
CO A 12/6/2022 12/5/2022 B - Approved as noted Answered
CO A 12/6/2022 12/5/2022 B - Approved as noted Answered
CO A 12/6/2022 12/5/2022 B - Approved as noted Answered
CO A 12/6/2022 12/5/2022 B - Approved as noted Answered
CO A 12/6/2022 12/5/2022 B - Approved as noted Answered
CO A 12/6/2022 12/5/2022 B - Approved as noted Answered
CO A 12/6/2022 12/5/2022 B - Approved as noted Answered
CO A 12/6/2022 12/5/2022 B - Approved as noted Answered
CO A 12/6/2022 12/5/2022 B - Approved as noted Answered
CO A 12/6/2022 12/5/2022 B - Approved as noted Answered
CO A 12/6/2022 12/5/2022 B - Approved as noted Answered
CO A 12/6/2022 12/5/2022 B - Approved as noted Answered
CO A 12/6/2022 12/5/2022 B - Approved as noted Answered
CO A 12/6/2022 12/5/2022 B - Approved as noted Answered
EC A 12/10/2022 12/8/2022 B - Approved as noted Answered
EC A 12/10/2022 12/8/2022 B - Approved as noted Answered
CO A 12/10/2022 12/8/2022 B - Approved as noted Answered
MC C 12/12/2022 12/8/2022 B - Approved as noted Answered
CO SU 12/12/2022 12/11/2022 B - Approved as noted Answered
EC SU 12/10/2022 12/8/2022 B - Approved as noted Answered
CC SU 12/10/2022 12/8/2022 B - Approved as noted Answered
NA SU 12/12/2022 12/11/2022 B - Approved as noted Answered
SM SU 12/10/2022 12/8/2022 C - Revise & Resubmit Answered
NA S 12/10/2022 12/8/2022 B - Approved as noted Answered
CO S 12/10/2022 12/8/2022 C - Revise & Resubmit Answered
CO S 12/10/2022 12/8/2022 B - Approved as noted Answered
EC S 12/10/2022 12/8/2022 B - Approved as noted Answered
EC S 12/10/2022 12/8/2022 B - Approved as noted Answered
CC S 12/10/2022 12/8/2022 B - Approved as noted Answered
CC S 12/10/2022 12/8/2022 B - Approved as noted Answered
CO S 12/10/2022 12/8/2022 B - Approved as noted Answered
CO S 12/10/2022 12/8/2022 C - Revise & Resubmit Answered
LM S 12/10/2022 12/8/2022 B - Approved as noted Answered
CO S 12/10/2022 12/8/2022 B - Approved as noted Answered
CO S 12/10/2022 12/8/2022 B - Approved as noted Answered
CO S 12/10/2022 12/8/2022 B - Approved as noted Answered
CO S 12/10/2022 12/8/2022 B - Approved as noted Answered
CO A 12/6/2022 12/5/2022 C - Revise & Resubmit Answered
NA S 12/10/2022 12/8/2022 B - Approved as noted Answered
SM S 12/10/2022 12/8/2022 B - Approved as noted Answered
SM S 12/10/2022 12/8/2022 C - Revise & Resubmit Answered
SM S 12/10/2022 12/8/2022 C - Revise & Resubmit Answered
CO S 12/10/2022 12/8/2022 B - Approved as noted Answered
CO S 12/10/2022 12/8/2022 B - Approved as noted Answered
EC SU 12/8/2022 12/7/2022 B - Approved as noted Answered
MC SU 12/8/2022 12/7/2022 B - Approved as noted Answered
CO SU 12/12/2022 12/11/2022 B - Approved as noted Answered
PC SU 12/8/2022 12/7/2022 B - Approved as noted Answered
LM SU 12/8/2022 12/7/2022 B - Approved as noted Answered
CO SU 12/7/2022 12/7/2022 B - Approved as noted Answered
CO C 12/8/2022 12/7/2022 B - Approved as noted Answered
CO C 12/8/2022 12/7/2022 B - Approved as noted Answered
EC C 12/8/2022 12/7/2022 B - Approved as noted Answered
CO C 12/8/2022 12/7/2022 B - Approved as noted Answered
CO C 12/5/2022 12/7/2022 B - Approved as noted Answered
CG C 12/12/2022 12/11/2022 B - Approved as noted Answered
CO C 12/8/2022 12/7/2022 B - Approved as noted Answered
CO A 12/8/2022 12/7/2022 B - Approved as noted Answered
SW C 12/10/2022 12/8/2022 B - Approved as noted Answered
SW C 12/12/2022 12/8/2022 B - Approved as noted Answered
SW C 12/12/2022 12/8/2022 B - Approved as noted Answered
SW C 12/12/2022 12/8/2022 B - Approved as noted Answered
SW C 12/12/2022 12/8/2022 B - Approved as noted Answered
SW C 12/12/2022 12/8/2022 B - Approved as noted Answered
SW C 12/12/2022 12/8/2022 B - Approved as noted Answered
SW C 12/10/2022 12/8/2022 B - Approved as noted Answered
SW C 12/10/2022 12/8/2022 B - Approved as noted Answered
PA C 12/10/2022 12/8/2022 B - Approved as noted Answered
SW C 12/12/2022 12/8/2022 B - Approved as noted Answered
SW C 12/11/2022 12/8/2022 B - Approved as noted Answered
SW C 12/11/2022 12/8/2022 B - Approved as noted Answered
SW C 12/12/2022 12/8/2022 B - Approved as noted Answered
SW C 12/12/2022 12/8/2022 B - Approved as noted Answered
SW C 12/12/2022 12/8/2022 B - Approved as noted Answered
PA C 12/11/2022 12/8/2022 B - Approved as noted Answered
SW C 12/11/2022 12/8/2022 C - Revise & Resubmit Answered
SW C 12/10/2022 12/8/2022 B - Approved as noted Answered
SW C 12/12/2022 12/8/2022 B - Approved as noted Answered
SW C 12/12/2022 12/8/2022 B - Approved as noted Answered
SW C 12/8/2022 12/7/2022 B - Approved as noted Answered
SW C 12/10/2022 12/8/2022 B - Approved as noted Answered
SW C 12/10/2022 12/8/2022 B - Approved as noted Answered
PA C 12/12/2022 12/8/2022 B - Approved as noted Answered
PA C 12/10/2022 12/8/2022 B - Approved as noted Answered
SW C 12/10/2022 12/8/2022 B - Approved as noted Answered
SW C 12/12/2022 12/8/2022 B - Approved as noted Answered
SW E 12/7/2022 12/6/2022 B - Approved as noted Answered
PG E 12/6/2022 12/5/2022 B - Approved as noted Answered
CO A 12/6/2022 12/5/2022 C - Revise & Resubmit Answered
CO A 12/5/2022 12/5/2022 C - Revise & Resubmit Answered
TG S 12/8/2022 12/7/2022 B - Approved as noted Answered
TG SU 12/8/2022 12/7/2022 B - Approved as noted Answered
CO A 12/6/2022 12/5/2022 C - Revise & Resubmit Answered
CO A 12/6/2022 12/5/2022 C - Revise & Resubmit Answered
TT A 12/8/2022 12/7/2022 B - Approved as noted Answered
WG C 12/8/2022 12/7/2022 B - Approved as noted Answered
WG C 12/8/2022 12/7/2022 B - Approved as noted Answered
WG C 12/8/2022 12/7/2022 B - Approved as noted Answered
TG S 12/12/2022 12/7/2022 C - Revise & Resubmit Answered
TT S 12/8/2022 12/7/2022 B - Approved as noted Answered
CO A 12/10/2022 12/8/2022 B - Approved as noted Answered
SW M 12/10/2022 12/8/2022 B - Approved as noted Answered
CO A 12/10/2022 12/8/2022 B - Approved as noted Answered
PC P 12/10/2022 12/8/2022 B - Approved as noted Answered
CO A 12/10/2022 12/8/2022 B - Approved as noted Answered
CO A 12/10/2022 12/8/2022 B - Approved as noted Answered
MB S 12/12/2022 12/7/2022 B - Approved as noted Answered
CO A 12/10/2022 12/8/2022 B - Approved as noted Answered
CO A 12/10/2022 12/8/2022 B - Approved as noted Answered
CO S 12/8/2022 12/7/2022 B - Approved as noted Answered
MC S 12/8/2022 12/7/2022 B - Approved as noted Answered
MC S 12/8/2022 12/7/2022 B - Approved as noted Answered
MC S 12/8/2022 12/7/2022 B - Approved as noted Answered
LM S 12/11/2022 12/7/2022 B - Approved as noted Answered
CO S 12/8/2022 12/7/2022 B - Approved as noted Answered
CO S 12/8/2022 12/7/2022 C - Revise & Resubmit Answered
CO S 12/8/2022 12/7/2022 B - Approved as noted Answered
CO S 12/8/2022 12/7/2022 B - Approved as noted Answered
EC S 12/8/2022 12/7/2022 B - Approved as noted Answered
PG S 12/8/2022 12/7/2022 B - Approved as noted Answered
EC S 12/8/2022 12/7/2022 B - Approved as noted Answered
WG LS 12/8/2022 12/7/2022 B - Approved as noted Answered
EC S 12/8/2022 12/7/2022 B - Approved as noted Answered
WG LS 12/8/2022 12/7/2022 B - Approved as noted Answered
CO S 12/8/2022 12/7/2022 B - Approved as noted Answered
LM S 12/11/2022 12/7/2022 B - Approved as noted Answered
CO S 12/8/2022 12/7/2022 B - Approved as noted Answered
PG C 12/8/2022 12/6/2022 B - Approved as noted Answered
PG C 12/8/2022 12/6/2022 B - Approved as noted Answered
PG C 12/7/2022 12/6/2022 B - Approved as noted Answered
PG C 12/7/2022 12/6/2022 B - Approved as noted Answered
WG C 12/7/2022 12/6/2022 B - Approved as noted Answered
WG C 12/7/2022 12/6/2022 B - Approved as noted Answered
WG C 12/7/2022 12/6/2022 B - Approved as noted Answered
FC A 12/7/2022 12/6/2022 B - Approved as noted Answered
WG LS 12/6/2022 12/5/2022 B - Approved as noted Answered
SW LS 12/11/2022 12/7/2022 B - Approved as noted Answered
SW LS 12/8/2022 12/7/2022 B - Approved as noted Answered
SW C 12/8/2022 12/7/2022 B - Approved as noted Answered
SW C 12/8/2022 12/7/2022 B - Approved as noted Answered
SW LS 12/8/2022 12/7/2022 A - Approved Answered
SW C 12/8/2022 12/7/2022 B - Approved as noted Answered
SW LS 12/8/2022 12/7/2022 A - Approved Answered
SW C 12/8/2022 12/7/2022 B - Approved as noted Answered
SW LS 12/8/2022 12/7/2022 A - Approved Answered
SW C 12/8/2022 12/7/2022 B - Approved as noted Answered
SW C 12/8/2022 12/7/2022 B - Approved as noted Answered
SW C 12/8/2022 12/7/2022 B - Approved as noted Answered
SW C 12/8/2022 12/7/2022 B - Approved as noted Answered
SW C 12/8/2022 12/7/2022 C - Revise & Resubmit Answered
SW C 12/11/2022 12/7/2022 B - Approved as noted Answered
SW C 12/8/2022 12/7/2022 B - Approved as noted Answered
CO SU 12/7/2022 12/6/2022 B - Approved as noted Answered
SW C 12/8/2022 12/7/2022 B - Approved as noted Answered
MC SU 12/7/2022 12/6/2022 B - Approved as noted Answered
SW C 12/8/2022 12/7/2022 B - Approved as noted Answered
CO SU 12/7/2022 12/6/2022 B - Approved as noted Answered
SW C 12/8/2022 12/7/2022 B - Approved as noted Answered
CO SU 12/7/2022 12/6/2022 B - Approved as noted Answered
SW C 12/8/2022 12/7/2022 B - Approved as noted Answered
MC C 12/7/2022 12/6/2022 B - Approved as noted Answered
PA C 12/8/2022 12/7/2022 B - Approved as noted Answered
MC C 12/7/2022 12/6/2022 B - Approved as noted Answered
EC C 12/10/2022 12/6/2022 B - Approved as noted Answered
MC C 12/12/2022 12/8/2022 B - Approved as noted Answered
SW C 11/26/2022 11/20/2022 B - Approved as noted Answered
SW C 11/26/2022 11/20/2022 B - Approved as noted Answered
SW M 12/8/2022 12/7/2022 B - Approved as noted Answered
PC P 12/8/2022 12/7/2022 B - Approved as noted Answered
PG LC 12/4/2022 12/6/2022 B - Approved as noted Answered
PG LC 12/4/2022 12/6/2022 B - Approved as noted Answered
SW LS 12/3/2022 11/26/2022 B - Approved as noted Answered
WG C 12/7/2022 12/6/2022 B - Approved as noted Answered
WG C 12/7/2022 12/6/2022 B - Approved as noted Answered
TG S 12/1/2022 11/30/2022 C - Revise & Resubmit Answered
CO S 12/7/2022 12/6/2022 C - Revise & Resubmit Answered
CO S 12/7/2022 12/6/2022 B - Approved as noted Answered
VG S 12/7/2022 12/6/2022 B - Approved as noted Answered
MC S 12/7/2022 12/6/2022 B - Approved as noted Answered
MC S 12/7/2022 12/6/2022 C - Revise & Resubmit Answered
CC S 12/7/2022 12/6/2022 B - Approved as noted Answered
CC S 12/7/2022 12/6/2022 B - Approved as noted Answered
CO S 12/8/2022 12/7/2022 B - Approved as noted Answered
CO S 12/7/2022 12/6/2022 B - Approved as noted Answered
CO S 12/7/2022 12/7/2022 B - Approved as noted Answered
CO S 12/7/2022 12/6/2022 B - Approved as noted Answered
CO S 12/7/2022 12/6/2022 B - Approved as noted Answered
CO S 12/7/2022 12/6/2022 B - Approved as noted Answered
CO S 12/7/2022 12/6/2022 B - Approved as noted Answered
SW C 12/7/2022 12/6/2022 B - Approved as noted Answered
SW C 12/7/2022 12/6/2022 B - Approved as noted Answered
SW C 12/7/2022 12/6/2022 B - Approved as noted Answered
SW C 12/7/2022 12/6/2022 B - Approved as noted Answered
SW C 12/7/2022 12/6/2022 B - Approved as noted Answered
SW C 12/7/2022 12/6/2022 B - Approved as noted Answered
SW C 12/7/2022 12/6/2022 B - Approved as noted Answered
SW C 12/7/2022 12/6/2022 B - Approved as noted Answered
SW C 12/7/2022 12/6/2022 B - Approved as noted Answered
SW C 12/7/2022 12/6/2022 B - Approved as noted Answered
SW C 12/7/2022 12/6/2022 B - Approved as noted Answered
SW C 12/7/2022 12/6/2022 B - Approved as noted Answered
SW LS 12/7/2022 12/6/2022 B - Approved as noted Answered
SW C 12/7/2022 12/6/2022 B - Approved as noted Answered
SW M 12/7/2022 12/6/2022 B - Approved as noted Answered
SW M 12/7/2022 12/6/2022 B - Approved as noted Answered
SW M 12/7/2022 12/6/2022 B - Approved as noted Answered
SW M 12/7/2022 12/6/2022 B - Approved as noted Answered
SW C 12/6/2022 12/5/2022 B - Approved as noted Answered
SW C 12/6/2022 12/5/2022 B - Approved as noted Answered
SW C 12/6/2022 12/5/2022 B - Approved as noted Answered
SW C 12/6/2022 12/5/2022 B - Approved as noted Answered
SW C 12/6/2022 12/5/2022 B - Approved as noted Answered
SW C 12/6/2022 12/5/2022 B - Approved as noted Answered
SW C 12/7/2022 12/6/2022 B - Approved as noted Answered
SW C 12/7/2022 12/6/2022 B - Approved as noted Answered
SW C 12/6/2022 12/5/2022 B - Approved as noted Answered
SW C 12/7/2022 12/6/2022 B - Approved as noted Answered
SW C 12/6/2022 12/5/2022 B - Approved as noted Answered
SW C 12/7/2022 12/6/2022 B - Approved as noted Answered
SW C 12/6/2022 12/5/2022 B - Approved as noted Answered
SW C 12/6/2022 12/5/2022 B - Approved as noted Answered
PA C 12/6/2022 12/5/2022 B - Approved as noted Answered
SW C 12/6/2022 12/5/2022 B - Approved as noted Answered
PA LS 12/6/2022 12/5/2022 B - Approved as noted Answered
PA LS 12/6/2022 12/5/2022 B - Approved as noted Answered
PA LS 12/6/2022 12/5/2022 C - Revise & Resubmit Answered
SW LS 12/6/2022 12/5/2022 B - Approved as noted Answered
SW E 12/6/2022 12/5/2022 B - Approved as noted Answered
SM E 12/6/2022 12/5/2022 B - Approved as noted Answered
PC LC 12/6/2022 12/5/2022 B - Approved as noted Answered
PC LC 12/6/2022 12/5/2022 B - Approved as noted Answered
GC C 12/6/2022 12/5/2022 B - Approved as noted Answered
CO C 12/6/2022 12/5/2022 B - Approved as noted Answered
CO SU 12/7/2022 12/6/2022 B - Approved as noted Answered
MC SU 12/7/2022 12/6/2022 B - Approved as noted Answered
CC SU 12/6/2022 12/5/2022 C - Revise & Resubmit Answered
CO SU 12/11/2022 12/5/2022 C - Revise & Resubmit Answered
CO SU 12/6/2022 12/5/2022 B - Approved as noted Answered
CO SU 12/6/2022 12/5/2022 B - Approved as noted Answered
CC SU 12/6/2022 12/5/2022 B - Approved as noted Answered
CO SU 12/6/2022 12/5/2022 B - Approved as noted Answered
EC SU 12/6/2022 12/5/2022 B - Approved as noted Answered
NA SU 12/6/2022 12/5/2022 B - Approved as noted Answered
CO S 12/11/2022 12/6/2022 B - Approved as noted Answered
CO S 12/7/2022 12/6/2022 B - Approved as noted Answered
CO S 12/7/2022 12/6/2022 B - Approved as noted Answered
CO S 12/7/2022 12/6/2022 C - Revise & Resubmit Answered
CO S 12/7/2022 12/6/2022 B - Approved as noted Answered
CO S 12/7/2022 12/6/2022 B - Approved as noted Answered
VG S 12/7/2022 12/6/2022 B - Approved as noted Answered
MC S 12/7/2022 12/6/2022 B - Approved as noted Answered
MC S 12/7/2022 12/6/2022 B - Approved as noted Answered
MC S 12/7/2022 12/6/2022 C - Revise & Resubmit Answered
CO S 12/6/2022 12/5/2022 B - Approved as noted Answered
CO S 12/6/2022 12/5/2022 B - Approved as noted Answered
CO S 12/6/2022 12/5/2022 B - Approved as noted Answered
CO S 12/11/2022 12/5/2022 C - Revise & Resubmit Answered
CO S 12/10/2022 12/5/2022 C - Revise & Resubmit Answered
CO S 12/6/2022 12/5/2022 B - Approved as noted Answered
EC S 12/6/2022 12/5/2022 B - Approved as noted Answered
CO S 12/6/2022 12/5/2022 B - Approved as noted Answered
CO S 12/6/2022 12/5/2022 B - Approved as noted Answered
CO S 12/6/2022 12/5/2022 B - Approved as noted Answered
TT E 12/5/2022 12/4/2022 B - Approved as noted Answered
TT E 12/5/2022 12/4/2022 B - Approved as noted Answered
SW E 12/5/2022 12/4/2022 C - Revise & Resubmit Answered
PC E 12/5/2022 12/4/2022 B - Approved as noted Answered
MB S 12/6/2022 12/5/2022 B - Approved as noted Answered
TB S 12/6/2022 12/5/2022 B - Approved as noted Answered
MB S 12/7/2022 12/5/2022 B - Approved as noted Answered
MB S 12/7/2022 12/5/2022 B - Approved as noted Answered
MB S 12/6/2022 12/5/2022 B - Approved as noted Answered
MB S 12/6/2022 12/5/2022 B - Approved as noted Answered
WG LS 12/6/2022 12/5/2022 B - Approved as noted Answered
WG C 12/6/2022 12/5/2022 B - Approved as noted Answered
WG C 12/6/2022 12/5/2022 B - Approved as noted Answered
PG SU 12/5/2022 12/4/2022 B - Approved as noted Answered
PG SU 12/5/2022 12/4/2022 B - Approved as noted Answered
WG C 12/5/2022 12/4/2022 B - Approved as noted Answered
PG C 12/8/2022 12/4/2022 B - Approved as noted Answered
WG C 12/5/2022 12/4/2022 B - Approved as noted Answered
WG C 12/5/2022 12/4/2022 B - Approved as noted Answered
WG C 12/5/2022 12/4/2022 B - Approved as noted Answered
PG C 12/5/2022 12/4/2022 B - Approved as noted Answered
CC LC 12/5/2022 12/4/2022 B - Approved as noted Answered
WG C 12/5/2022 12/4/2022 B - Approved as noted Answered
WG C 12/5/2022 12/4/2022 B - Approved as noted Answered
WG S 12/5/2022 12/4/2022 B - Approved as noted Answered
WG S 12/5/2022 12/4/2022 B - Approved as noted Answered
PG S 12/5/2022 12/4/2022 B - Approved as noted Answered
SW M 12/6/2022 12/5/2022 B - Approved as noted Answered
CO S 12/6/2022 12/5/2022 B - Approved as noted Answered
NA S 12/6/2022 12/5/2022 B - Approved as noted Answered
NA S 12/6/2022 12/5/2022 B - Approved as noted Answered
EC S 12/6/2022 12/5/2022 B - Approved as noted Answered
CO S 12/6/2022 12/5/2022 B - Approved as noted Answered
CO S 12/7/2022 12/6/2022 B - Approved as noted Answered
NA LC 12/5/2022 12/4/2022 B - Approved as noted Answered
LM S 12/11/2022 12/5/2022 B - Approved as noted Answered
NA S 12/6/2022 12/5/2022 B - Approved as noted Answered
CF S 12/15/2022 12/14/2022 B - Approved as noted Answered
CO S 12/6/2022 12/5/2022 B - Approved as noted Answered
LM S 12/11/2022 12/5/2022 B - Approved as noted Answered
CO S 12/6/2022 12/5/2022 B - Approved as noted Answered
SW LS 12/5/2022 12/4/2022 B - Approved as noted Answered
PA C 12/5/2022 12/4/2022 B - Approved as noted Answered
PA C 12/5/2022 12/4/2022 B - Approved as noted Answered
SW C 12/7/2022 12/4/2022 B - Approved as noted Answered
SW C 12/8/2022 12/4/2022 B - Approved as noted Answered
SW C 12/7/2022 12/4/2022 B - Approved as noted Answered
SW C 12/5/2022 12/4/2022 B - Approved as noted Answered
SW C 12/5/2022 12/4/2022 B - Approved as noted Answered
SW C 12/5/2022 12/4/2022 B - Approved as noted Answered
SW C 12/5/2022 12/4/2022 B - Approved as noted Answered
SW C 12/5/2022 12/4/2022 B - Approved as noted Answered
SW C 12/6/2022 12/5/2022 B - Approved as noted Answered
SW C 12/5/2022 12/4/2022 B - Approved as noted Answered
SW C 12/5/2022 12/4/2022 B - Approved as noted Answered
SW C 12/11/2022 12/4/2022 B - Approved as noted Answered
SW C 12/5/2022 12/4/2022 B - Approved as noted Answered
SW C 12/7/2022 12/4/2022 B - Approved as noted Answered
SW C 12/7/2022 12/4/2022 B - Approved as noted Answered
SW C 12/7/2022 12/4/2022 B - Approved as noted Answered
SW C 12/5/2022 12/4/2022 B - Approved as noted Answered
SW C 12/5/2022 12/4/2022 B - Approved as noted Answered
SW C 12/5/2022 12/4/2022 B - Approved as noted Answered
SW C 12/5/2022 12/4/2022 B - Approved as noted Answered
SW C 12/5/2022 12/4/2022 C - Revise & Resubmit Answered
SW C 12/5/2022 12/4/2022 B - Approved as noted Answered
SW C 12/5/2022 12/4/2022 B - Approved as noted Answered
SM A 12/5/2022 12/4/2022 B - Approved as noted Answered
SM A 12/5/2022 12/4/2022 B - Approved as noted Answered
CO SU 12/5/2022 12/4/2022 B - Approved as noted Answered
CO SU 12/5/2022 12/4/2022 B - Approved as noted Answered
SM SU 12/5/2022 12/4/2022 C - Revise & Resubmit Answered
LM SU 12/5/2022 12/4/2022 B - Approved as noted Answered
LM SU 12/5/2022 12/4/2022 B - Approved as noted Answered
LG C 12/5/2022 12/4/2022 B - Approved as noted Answered
NG C 12/5/2022 12/4/2022 B - Approved as noted Answered
LG C 12/5/2022 12/4/2022 B - Approved as noted Answered
NG C 12/5/2022 12/4/2022 B - Approved as noted Answered
PG LS 12/6/2022 12/3/2022 B - Approved as noted Answered
WG C 12/4/2022 12/3/2022 B - Approved as noted Answered
PG C 12/7/2022 12/3/2022 B - Approved as noted Answered
PG C 12/7/2022 12/3/2022 B - Approved as noted Answered
PG C 12/7/2022 12/3/2022 B - Approved as noted Answered
PG C 12/7/2022 12/3/2022 B - Approved as noted Answered
CC LC 12/3/2022 12/3/2022 B - Approved as noted Answered
CC LC 12/3/2022 12/3/2022 B - Approved as noted Answered
NA LC 12/3/2022 12/3/2022 B - Approved as noted Answered
EC C 12/6/2022 12/5/2022 B - Approved as noted Answered
MC C 12/5/2022 12/4/2022 B - Approved as noted Answered
CO C 12/5/2022 12/4/2022 B - Approved as noted Answered
CO C 12/5/2022 12/4/2022 B - Approved as noted Answered
CO C 12/6/2022 12/4/2022 B - Approved as noted Answered
CO C 12/5/2022 12/4/2022 B - Approved as noted Answered
EC C 12/4/2022 12/3/2022 B - Approved as noted Answered
CO S 12/5/2022 12/4/2022 B - Approved as noted Answered
CO S 12/5/2022 12/4/2022 B - Approved as noted Answered
CO S 12/5/2022 12/4/2022 B - Approved as noted Answered
CO S 12/5/2022 12/4/2022 C - Revise & Resubmit Answered
CO S 12/5/2022 12/4/2022 B - Approved as noted Answered
SM S 12/5/2022 12/4/2022 B - Approved as noted Answered
SM S 12/5/2022 12/4/2022 C - Revise & Resubmit Answered
LM S 12/5/2022 12/4/2022 C - Revise & Resubmit Answered
CO S 12/5/2022 12/4/2022 B - Approved as noted Answered
CO S 12/5/2022 12/4/2022 B - Approved as noted Answered
SM S 12/15/2022 12/14/2022 B - Approved as noted Answered
NA S 12/5/2022 12/4/2022 B - Approved as noted Answered
CO S 12/5/2022 12/4/2022 B - Approved as noted Answered
LM S 12/11/2022 12/4/2022 B - Approved as noted Answered
LM S 12/11/2022 12/4/2022 B - Approved as noted Answered
CO S 11/27/2022 11/27/2022 B - Approved as noted Answered
CO S 11/10/2022 11/6/2022 B - Approved as noted Answered
MC S 11/6/2022 11/5/2022 B - Approved as noted Answered
WG LC 12/3/2022 12/1/2022 B - Approved as noted Answered
WG LC 12/3/2022 12/1/2022 B - Approved as noted Answered
PG E 12/4/2022 12/3/2022 B - Approved as noted Answered
PG E 12/4/2022 12/3/2022 B - Approved as noted Answered
WG E 12/3/2022 12/1/2022 B - Approved as noted Answered
WG E 12/3/2022 12/1/2022 B - Approved as noted Answered
CC E 12/4/2022 12/3/2022 B - Approved as noted Answered
SW E 12/1/2022 11/30/2022 B - Approved as noted Answered
SW M 12/5/2022 12/4/2022 B - Approved as noted Answered
SW C 12/3/2022 12/3/2022 B - Approved as noted Answered
TG C 12/3/2022 12/3/2022 B - Approved as noted Answered
WG P 12/5/2022 12/4/2022 B - Approved as noted Answered
SW C 12/3/2022 12/3/2022 B - Approved as noted Answered
CO SU 12/4/2022 12/3/2022 B - Approved as noted Answered
CO SU 12/4/2022 12/3/2022 B - Approved as noted Answered
CO SU 12/4/2022 12/3/2022 B - Approved as noted Answered
LM SU 12/4/2022 12/3/2022 B - Approved as noted Answered
CC C 12/4/2022 12/3/2022 B - Approved as noted Answered
CO A 12/3/2022 12/3/2022 B - Approved as noted Answered
CO A 12/3/2022 12/3/2022 B - Approved as noted Answered
CO A 11/8/2022 11/7/2022 B - Approved as noted Answered
SM A 11/3/2022 11/2/2022 B - Approved as noted Answered
CO S 12/1/2022 11/30/2022 B - Approved as noted Answered
CO S 12/1/2022 11/30/2022 B - Approved as noted Answered
CO S 12/3/2022 12/3/2022 B - Approved as noted Answered
CO S 12/4/2022 12/3/2022 B - Approved as noted Answered
CO S 12/4/2022 12/3/2022 B - Approved as noted Answered
CO S 12/4/2022 12/3/2022 B - Approved as noted Answered
CO S 12/4/2022 12/3/2022 B - Approved as noted Answered
CO S 12/4/2022 12/3/2022 B - Approved as noted Answered
CO S 12/4/2022 12/3/2022 B - Approved as noted Answered
CO S 12/4/2022 12/3/2022 B - Approved as noted Answered
LM S 12/4/2022 12/3/2022 B - Approved as noted Answered
CO S 12/4/2022 12/3/2022 B - Approved as noted Answered
CO S 12/8/2022 12/3/2022 B - Approved as noted Answered
SM S 12/4/2022 12/4/2022 C - Revise & Resubmit Answered
SW LS 12/4/2022 12/3/2022 B - Approved as noted Answered
SW LS 12/4/2022 12/6/2022 B - Approved as noted Answered
SW C 12/4/2022 12/3/2022 C - Revise & Resubmit Answered
SW C 12/4/2022 12/3/2022 B - Approved as noted Answered
SW C 12/4/2022 12/3/2022 B - Approved as noted Answered
SW C 12/4/2022 12/3/2022 B - Approved as noted Answered
SW C 12/4/2022 12/3/2022 B - Approved as noted Answered
SW C 12/4/2022 12/3/2022 B - Approved as noted Answered
SW C 12/7/2022 12/3/2022 B - Approved as noted Answered
PA C 12/7/2022 12/3/2022 B - Approved as noted Answered
SW C 12/7/2022 12/3/2022 B - Approved as noted Answered
SW C 12/3/2022 12/3/2022 C - Revise & Resubmit Answered
SW C 12/3/2022 12/3/2022 B - Approved as noted Answered
SW C 12/3/2022 12/3/2022 B - Approved as noted Answered
SW C 12/3/2022 12/4/2022 B - Approved as noted Answered
SW C 12/3/2022 12/3/2022 B - Approved as noted Answered
SW C 12/3/2022 12/3/2022 B - Approved as noted Answered
SW C 12/3/2022 12/3/2022 B - Approved as noted Answered
SW C 12/3/2022 12/3/2022 B - Approved as noted Answered
SW C 12/3/2022 12/3/2022 B - Approved as noted Answered
SW C 12/5/2022 12/3/2022 B - Approved as noted Answered
SW C 12/3/2022 12/3/2022 B - Approved as noted Answered
SW C 12/3/2022 12/3/2022 B - Approved as noted Answered
SW C 12/3/2022 12/3/2022 B - Approved as noted Answered
SW C 12/7/2022 12/3/2022 C - Revise & Resubmit Answered
SW C 12/3/2022 12/3/2022 B - Approved as noted Answered
SW C 12/3/2022 12/3/2022 B - Approved as noted Answered
SW C 12/3/2022 12/3/2022 B - Approved as noted Answered
SW C 12/5/2022 12/3/2022 B - Approved as noted Answered
PA LS 12/3/2022 12/3/2022 B - Approved as noted Answered
SW LS 12/3/2022 11/30/2022 B - Approved as noted Answered
SW C 12/1/2022 11/30/2022 C - Revise & Resubmit Answered
SW C 12/1/2022 11/30/2022 B - Approved as noted Answered
SW C 12/1/2022 11/30/2022 B - Approved as noted Answered
SW C 12/1/2022 11/30/2022 B - Approved as noted Answered
SW C 1/7/2023 11/30/2022 B - Approved as noted Answered
SW C 12/1/2022 11/30/2022 B - Approved as noted Answered
SW C 12/1/2022 11/30/2022 B - Approved as noted Answered
SW C 12/1/2022 11/30/2022 B - Approved as noted Answered
SW C 12/3/2022 11/30/2022 B - Approved as noted Answered
SW C 12/3/2022 11/30/2022 B - Approved as noted Answered
SW C 12/1/2022 11/30/2022 B - Approved as noted Answered
SW C 12/1/2022 11/30/2022 B - Approved as noted Answered
SW C 12/1/2022 11/30/2022 B - Approved as noted Answered
PA C 12/1/2022 11/30/2022 B - Approved as noted Answered
PA C 12/1/2022 11/30/2022 B - Approved as noted Answered
PA C 12/1/2022 11/30/2022 B - Approved as noted Answered
WG LS 12/3/2022 12/3/2022 B - Approved as noted Answered
WG LS 12/6/2022 12/3/2022 B - Approved as noted Answered
WG LS 12/4/2022 12/3/2022 B - Approved as noted Answered
WG LS 12/3/2022 12/3/2022 B - Approved as noted Answered
WG LS 12/4/2022 12/3/2022 B - Approved as noted Answered
WG LS 12/3/2022 12/3/2022 B - Approved as noted Answered
WG LS 12/4/2022 12/3/2022 B - Approved as noted Answered
WG LS 12/3/2022 12/3/2022 B - Approved as noted Answered
TT A 12/1/2022 11/30/2022 B - Approved as noted Answered
MB S 12/1/2022 11/30/2022 B - Approved as noted Answered
PG S 12/1/2022 11/30/2022 B - Approved as noted Answered
WG S 12/1/2022 11/30/2022 B - Approved as noted Answered
WG S 12/1/2022 11/30/2022 B - Approved as noted Answered
TG SU 12/1/2022 11/30/2022 B - Approved as noted Answered
PG C 12/1/2022 11/30/2022 B - Approved as noted Answered
PG C 12/1/2022 11/30/2022 B - Approved as noted Answered
PG C 12/3/2022 11/30/2022 B - Approved as noted Answered
PG C 12/1/2022 11/30/2022 B - Approved as noted Answered
SW C 11/29/2022 11/28/2022 B - Approved as noted Answered
SW LS 12/3/2022 11/28/2022 B - Approved as noted Answered
SW C 11/29/2022 11/28/2022 B - Approved as noted Answered
SW C 11/29/2022 11/28/2022 B - Approved as noted Answered
SW C 11/29/2022 11/28/2022 B - Approved as noted Answered
SW C 11/29/2022 11/28/2022 B - Approved as noted Answered
SW C 11/29/2022 11/28/2022 B - Approved as noted Answered
SW C 11/29/2022 11/28/2022 B - Approved as noted Answered
SW C 11/29/2022 11/28/2022 B - Approved as noted Answered
SW C 11/29/2022 11/28/2022 B - Approved as noted Answered
SW C 11/29/2022 11/28/2022 B - Approved as noted Answered
SW C 11/29/2022 11/28/2022 B - Approved as noted Answered
SW C 11/29/2022 11/28/2022 B - Approved as noted Answered
SW C 11/29/2022 11/28/2022 B - Approved as noted Answered
SW C 11/29/2022 11/28/2022 B - Approved as noted Answered
SW C 11/29/2022 11/28/2022 B - Approved as noted Answered
SW C 11/29/2022 11/28/2022 B - Approved as noted Answered
SW C 11/29/2022 11/28/2022 C - Revise & Resubmit Answered
SW C 11/29/2022 11/28/2022 B - Approved as noted Answered
SW C 11/29/2022 11/28/2022 B - Approved as noted Answered
SW C 11/29/2022 11/28/2022 B - Approved as noted Answered
SW C 11/29/2022 11/28/2022 B - Approved as noted Answered
SW C 11/29/2022 11/28/2022 B - Approved as noted Answered
PA C 11/29/2022 11/28/2022 B - Approved as noted Answered
CO C 11/27/2022 11/26/2022 B - Approved as noted Answered
MC SU 12/3/2022 12/5/2022 B - Approved as noted Answered
CO SU 12/3/2022 12/3/2022 B - Approved as noted Answered
NA SU 12/3/2022 12/3/2022 B - Approved as noted Answered
EC SU 12/3/2022 12/3/2022 B - Approved as noted Answered
NA SU 12/5/2022 12/4/2022 B - Approved as noted Answered
CO SU 12/4/2022 12/3/2022 B - Approved as noted Answered
EC SU 11/2/2022 11/1/2022 B - Approved as noted Answered
CF SU 12/3/2022 12/1/2022 B - Approved as noted Answered
CO S 12/3/2022 12/3/2022 C - Revise & Resubmit Answered
MC S 12/3/2022 12/3/2022 B - Approved as noted Answered
MC S 12/3/2022 12/3/2022 B - Approved as noted Answered
CO S 12/3/2022 12/3/2022 B - Approved as noted Answered
SW C 11/26/2022 11/22/2022 C - Revise & Resubmit Answered
EC S 12/3/2022 12/3/2022 B - Approved as noted Answered
NA S 12/3/2022 12/3/2022 B - Approved as noted Answered
CO S 12/3/2022 12/3/2022 B - Approved as noted Answered
CO S 12/3/2022 12/3/2022 B - Approved as noted Answered
EC S 12/3/2022 12/3/2022 B - Approved as noted Answered
CO S 12/3/2022 12/3/2022 B - Approved as noted Answered
CO S 11/1/2022 10/31/2022 B - Approved as noted Answered
CO S 11/1/2022 10/31/2022 B - Approved as noted Answered
CO S 10/24/2022 10/23/2022 B - Approved as noted Answered
CO S 11/12/2022 11/10/2022 B - Approved as noted Answered
CO S 11/12/2022 11/10/2022 B - Approved as noted Answered
CO S 11/12/2022 11/10/2022 B - Approved as noted Answered
PC S 11/28/2022 11/27/2022 C - Revise & Resubmit Answered
PC S 11/28/2022 11/27/2022 C - Revise & Resubmit Answered
CO S 11/27/2022 11/26/2022 B - Approved as noted Answered
CO S 12/3/2022 12/3/2022 C - Revise & Resubmit Answered
CO S 12/3/2022 12/1/2022 B - Approved as noted Answered
CF S 12/3/2022 12/1/2022 B - Approved as noted Answered
CO C 11/23/2022 11/22/2022 B - Approved as noted Answered
CO S 11/22/2022 11/21/2022 B - Approved as noted Answered
NA LC 11/30/2022 11/30/2022 B - Approved as noted Answered
LM LC 11/30/2022 11/30/2022 B - Approved as noted Answered
PA C 11/29/2022 11/28/2022 B - Approved as noted Answered
SW M 12/1/2022 11/30/2022 B - Approved as noted Answered
SW C 12/1/2022 11/30/2022 B - Approved as noted Answered
CO A 12/1/2022 11/30/2022 B - Approved as noted Answered
CO A 12/1/2022 11/30/2022 C - Revise & Resubmit Answered
CO C 12/5/2022 11/30/2022 B - Approved as noted Answered
SW C 12/1/2022 11/30/2022 B - Approved as noted Answered
CO C 12/1/2022 11/30/2022 B - Approved as noted Answered
MC C 12/1/2022 11/30/2022 B - Approved as noted Answered
CO C 12/1/2022 11/30/2022 B - Approved as noted Answered
CO C 12/1/2022 11/30/2022 B - Approved as noted Answered
VG SU 12/1/2022 11/30/2022 B - Approved as noted Answered
CO SU 12/1/2022 11/30/2022 B - Approved as noted Answered
CO SU 12/1/2022 11/30/2022 B - Approved as noted Answered
CO SU 12/1/2022 11/30/2022 B - Approved as noted Answered
NA SU 12/1/2022 11/30/2022 B - Approved as noted Answered
CO S 12/1/2022 11/30/2022 C - Revise & Resubmit Answered
CO S 12/1/2022 11/30/2022 C - Revise & Resubmit Answered
CO S 12/1/2022 11/30/2022 B - Approved as noted Answered
CO S 12/1/2022 11/30/2022 C - Revise & Resubmit Answered
CO S 12/1/2022 11/30/2022 B - Approved as noted Answered
VG S 12/1/2022 11/30/2022 B - Approved as noted Answered
NA S 12/1/2022 11/30/2022 B - Approved as noted Answered
CO S 12/1/2022 11/30/2022 B - Approved as noted Answered
CO S 12/1/2022 11/30/2022 B - Approved as noted Answered
VG S 12/1/2022 11/30/2022 B - Approved as noted Answered
VG S 12/1/2022 11/30/2022 B - Approved as noted Answered
VG S 12/1/2022 11/30/2022 B - Approved as noted Answered
NA S 12/1/2022 11/30/2022 B - Approved as noted Answered
NA S 12/1/2022 11/30/2022 B - Approved as noted Answered
NA S 12/1/2022 11/30/2022 C - Revise & Resubmit Answered
WG S 11/29/2022 11/28/2022 B - Approved as noted Answered
WG S 11/29/2022 11/28/2022 B - Approved as noted Answered
SW E 11/30/2022 11/29/2022 B - Approved as noted Answered
SW E 11/30/2022 11/29/2022 B - Approved as noted Answered
SW E 11/29/2022 11/28/2022 B - Approved as noted Answered
TT E 11/28/2022 11/28/2022 C - Revise & Resubmit Answered
SW C 11/30/2022 11/30/2022 B - Approved as noted Answered
TT E 11/29/2022 11/28/2022 C - Revise & Resubmit Answered
SW C 11/30/2022 11/30/2022 B - Approved as noted Answered
SW C 11/30/2022 11/30/2022 B - Approved as noted Answered
SW C 11/30/2022 11/30/2022 B - Approved as noted Answered
TT E 11/28/2022 11/27/2022 C - Revise & Resubmit Answered
SW C 11/30/2022 11/30/2022 B - Approved as noted Answered
SW C 11/30/2022 11/30/2022 B - Approved as noted Answered
SW C 11/30/2022 11/30/2022 B - Approved as noted Answered
SW LS 11/29/2022 11/28/2022 A - Approved Answered
SW C 11/30/2022 11/30/2022 B - Approved as noted Answered
SW C 11/30/2022 11/30/2022 B - Approved as noted Answered
SW C 11/30/2022 11/30/2022 B - Approved as noted Answered
SW C 11/30/2022 11/30/2022 B - Approved as noted Answered
SW C 11/1/2022 11/30/2022 B - Approved as noted Answered
SW C 11/30/2022 11/30/2022 B - Approved as noted Answered
SW C 12/4/2022 11/30/2022 B - Approved as noted Answered
SW C 11/30/2022 11/30/2022 B - Approved as noted Answered
MB LC 11/29/2022 11/28/2022 B - Approved as noted Answered
SW C 11/30/2022 11/30/2022 B - Approved as noted Answered
SW C 11/30/2022 11/30/2022 B - Approved as noted Answered
SW C 11/30/2022 11/30/2022 B - Approved as noted Answered
TT LC 11/29/2022 11/28/2022 C - Revise & Resubmit Answered
TT LC 11/29/2022 11/28/2022 C - Revise & Resubmit Answered
SW C 11/30/2022 11/30/2022 B - Approved as noted Answered
TT LC 11/29/2022 11/28/2022 C - Revise & Resubmit Answered
SW C 11/30/2022 11/30/2022 B - Approved as noted Answered
TT LC 11/29/2022 11/28/2022 C - Revise & Resubmit Answered
SW C 11/30/2022 11/30/2022 B - Approved as noted Answered
PA C 11/30/2022 11/30/2022 B - Approved as noted Answered
MB S 11/30/2022 11/30/2022 B - Approved as noted Answered
MB S 11/30/2022 11/30/2022 B - Approved as noted Answered
WG LS 11/30/2022 11/30/2022 B - Approved as noted Answered
SW C 11/30/2022 11/30/2022 B - Approved as noted Answered
WG LS 12/4/2022 11/30/2022 B - Approved as noted Answered
SW C 11/30/2022 11/30/2022 B - Approved as noted Answered
SW C 11/30/2022 11/30/2022 B - Approved as noted Answered
PA LS 11/30/2022 11/30/2022 B - Approved as noted Answered
MB SU 11/30/2022 11/30/2022 B - Approved as noted Answered
PA LS 11/30/2022 11/30/2022 B - Approved as noted Answered
MB SU 11/30/2022 11/30/2022 B - Approved as noted Answered
WG C 11/30/2022 11/30/2022 B - Approved as noted Answered
MB C 11/30/2022 11/30/2022 B - Approved as noted Answered
CO C 11/30/2022 11/30/2022 B - Approved as noted Answered
WG C 11/30/2022 11/30/2022 B - Approved as noted Answered
WG C 11/30/2022 11/30/2022 B - Approved as noted Answered
SM A 11/30/2022 11/30/2022 B - Approved as noted Answered
WG C 12/3/2022 11/30/2022 B - Approved as noted Answered
SM A 11/30/2022 11/30/2022 B - Approved as noted Answered
SM A 11/30/2022 11/30/2022 B - Approved as noted Answered
SM A 11/30/2022 11/30/2022 B - Approved as noted Answered
WG C 11/30/2022 11/30/2022 B - Approved as noted Answered
MC SU 11/30/2022 11/30/2022 B - Approved as noted Answered
CO SU 11/30/2022 11/30/2022 B - Approved as noted Answered
CO SU 11/30/2022 11/30/2022 B - Approved as noted Answered
CO SU 11/30/2022 11/30/2022 B - Approved as noted Answered
CO SU 11/1/2022 11/30/2022 B - Approved as noted Answered
CO SU 11/30/2022 11/30/2022 C - Revise & Resubmit Answered
LM S 11/30/2022 11/30/2022 B - Approved as noted Answered
CO S 11/30/2022 11/30/2022 B - Approved as noted Answered
MC S 11/30/2022 11/30/2022 B - Approved as noted Answered
MC S 11/30/2022 11/30/2022 B - Approved as noted Answered
GC C 12/3/2022 11/30/2022 B - Approved as noted Answered
CO S 11/30/2022 11/30/2022 B - Approved as noted Answered
CO S 11/30/2022 11/30/2022 B - Approved as noted Answered
MC S 11/30/2022 11/30/2022 B - Approved as noted Answered
NA S 11/30/2022 11/30/2022 B - Approved as noted Answered
CC S 11/1/2022 11/30/2022 B - Approved as noted Answered
GC C 11/30/2022 11/30/2022 B - Approved as noted Answered
CO S 11/30/2022 11/30/2022 B - Approved as noted Answered
CO S 11/30/2022 11/30/2022 B - Approved as noted Answered
CO S 11/30/2022 11/30/2022 B - Approved as noted Answered
CO S 11/30/2022 11/30/2022 B - Approved as noted Answered
NA S 11/30/2022 11/30/2022 B - Approved as noted Answered
NA S 11/30/2022 11/30/2022 B - Approved as noted Answered
CO S 11/30/2022 11/30/2022 B - Approved as noted Answered
CO S 11/30/2022 11/30/2022 C - Revise & Resubmit Answered
CO S 11/30/2022 11/30/2022 B - Approved as noted Answered
DG E 12/4/2022 11/30/2022 B - Approved as noted Answered
PG E 11/28/2022 11/27/2022 C - Revise & Resubmit Answered
PG E 11/28/2022 11/27/2022 C - Revise & Resubmit Answered
LM LC 11/30/2022 11/30/2022 C - Revise & Resubmit Answered
SW LC 11/28/2022 11/28/2022 B - Approved as noted Answered
SW LC 11/28/2022 11/28/2022 B - Approved as noted Answered
SW LS 12/3/2022 11/28/2022 B - Approved as noted Answered
SW LS 12/3/2022 11/28/2022 B - Approved as noted Answered
SW C 11/28/2022 11/28/2022 B - Approved as noted Answered
SW C 11/28/2022 11/28/2022 B - Approved as noted Answered
SW C 11/28/2022 11/28/2022 B - Approved as noted Answered
SW C 11/28/2022 11/28/2022 B - Approved as noted Answered
SW C 11/28/2022 11/28/2022 B - Approved as noted Answered
SW C 11/28/2022 11/28/2022 B - Approved as noted Answered
SW C 11/28/2022 11/28/2022 B - Approved as noted Answered
SW C 11/28/2022 11/28/2022 B - Approved as noted Answered
SW C 11/28/2022 11/28/2022 B - Approved as noted Answered
SW C 11/28/2022 11/28/2022 B - Approved as noted Answered
SW C 11/28/2022 11/28/2022 B - Approved as noted Answered
WG C 11/30/2022 11/30/2022 B - Approved as noted Answered
PG C 11/30/2022 11/30/2022 B - Approved as noted Answered
SW C 11/28/2022 11/28/2022 B - Approved as noted Answered
PA LS 11/28/2022 11/28/2022 B - Approved as noted Answered
PA LS 11/28/2022 11/28/2022 B - Approved as noted Answered
TG LS 11/29/2022 11/28/2022 B - Approved as noted Answered
MC C 11/29/2022 11/28/2022 B - Approved as noted Answered
CO C 11/30/2022 11/30/2022 B - Approved as noted Answered
TG LS 11/29/2022 11/28/2022 B - Approved as noted Answered
TG LS 11/29/2022 11/28/2022 B - Approved as noted Answered
CO C 11/29/2022 11/28/2022 B - Approved as noted Answered
TG LS 11/29/2022 11/28/2022 B - Approved as noted Answered
CO C 11/29/2022 11/28/2022 B - Approved as noted Answered
WG SU 11/29/2022 11/28/2022 B - Approved as noted Answered
CO C 11/29/2022 11/28/2022 B - Approved as noted Answered
WG C 11/29/2022 11/28/2022 B - Approved as noted Answered
PG C 11/29/2022 11/28/2022 B - Approved as noted Answered
WG C 11/29/2022 11/28/2022 B - Approved as noted Answered
EC C 11/29/2022 11/28/2022 B - Approved as noted Answered
PG C 11/29/2022 11/28/2022 B - Approved as noted Answered
WG C 11/29/2022 11/28/2022 B - Approved as noted Answered
WG C 11/29/2022 11/28/2022 B - Approved as noted Answered
MC C 11/29/2022 11/28/2022 B - Approved as noted Answered
CO C 11/29/2022 11/28/2022 B - Approved as noted Answered
VG C 11/29/2022 11/28/2022 B - Approved as noted Answered
VG C 11/29/2022 11/28/2022 B - Approved as noted Answered
CO SU 11/29/2022 11/28/2022 B - Approved as noted Answered
LM A 11/29/2022 11/28/2022 B - Approved as noted Answered
CO SU 11/29/2022 11/28/2022 B - Approved as noted Answered
EC SU 11/29/2022 11/28/2022 B - Approved as noted Answered
EC SU 11/29/2022 11/28/2022 B - Approved as noted Answered
CO SU 11/29/2022 11/28/2022 B - Approved as noted Answered
CO S 11/19/2022 11/19/2022 B - Approved as noted Answered
CO S 11/19/2022 11/19/2022 B - Approved as noted Answered
CO S 11/19/2022 11/19/2022 B - Approved as noted Answered
CO S 11/30/2022 11/30/2022 B - Approved as noted Answered
CC S 11/29/2022 11/28/2022 B - Approved as noted Answered
CC S 11/29/2022 11/28/2022 B - Approved as noted Answered
CO S 11/29/2022 11/28/2022 B - Approved as noted Answered
EC S 11/29/2022 11/28/2022 B - Approved as noted Answered
EC S 11/29/2022 11/28/2022 B - Approved as noted Answered
EC S 11/29/2022 11/28/2022 B - Approved as noted Answered
EC S 11/29/2022 11/28/2022 B - Approved as noted Answered
CO S 11/29/2022 11/28/2022 B - Approved as noted Answered
CO S 11/29/2022 11/28/2022 B - Approved as noted Answered
CO S 11/29/2022 11/28/2022 B - Approved as noted Answered
CO S 11/29/2022 11/28/2022 B - Approved as noted Answered
CO S 11/29/2022 11/28/2022 B - Approved as noted Answered
CO S 11/29/2022 11/28/2022 B - Approved as noted Answered
CO S 11/29/2022 11/28/2022 B - Approved as noted Answered
LM S 11/29/2022 11/28/2022 B - Approved as noted Answered
CO S 11/19/2022 11/17/2022 B - Approved as noted Answered
CO S 4/21/2022 4/20/2022 C - Revise & Resubmit Answered
LM SU 11/28/2022 11/28/2022 B - Approved as noted Answered
MC SU 11/28/2022 11/28/2022 B - Approved as noted Answered
CC SU 11/28/2022 11/27/2022 B - Approved as noted Answered
CO SU 11/28/2022 11/27/2022 B - Approved as noted Answered
CO S 11/29/2022 11/28/2022 B - Approved as noted Answered
SM P 11/29/2022 11/28/2022 B - Approved as noted Answered
SW M 11/29/2022 11/28/2022 B - Approved as noted Answered
SW M 11/29/2022 11/28/2022 B - Approved as noted Answered
SW C 11/29/2022 11/28/2022 B - Approved as noted Answered
SW C 11/29/2022 11/28/2022 B - Approved as noted Answered
SW C 11/29/2022 11/28/2022 B - Approved as noted Answered
SW C 11/29/2022 11/28/2022 B - Approved as noted Answered
SW C 11/29/2022 11/28/2022 B - Approved as noted Answered
SW C 11/29/2022 11/28/2022 B - Approved as noted Answered
SW C 11/29/2022 11/28/2022 B - Approved as noted Answered
SW C 11/29/2022 11/28/2022 B - Approved as noted Answered
SM SU 11/21/2022 11/20/2022 B - Approved as noted Answered
TG C 11/28/2022 11/28/2022 B - Approved as noted Answered
TG C 11/28/2022 11/28/2022 B - Approved as noted Answered
WG C 11/28/2022 11/28/2022 B - Approved as noted Answered
PG SU 11/28/2022 11/28/2022 B - Approved as noted Answered
PG S 11/28/2022 11/28/2022 B - Approved as noted Answered
CO S 11/19/2022 11/17/2022 B - Approved as noted Answered
CO S 4/21/2022 4/20/2022 C - Revise & Resubmit Answered
SW C 11/21/2022 11/20/2022 B - Approved as noted Answered
MC S 11/28/2022 11/28/2022 B - Approved as noted Answered
LM S 11/28/2022 11/28/2022 B - Approved as noted Answered
LM S 11/28/2022 11/28/2022 C - Revise & Resubmit Answered
NA S 11/28/2022 11/27/2022 B - Approved as noted Answered
MC S 11/28/2022 11/28/2022 B - Approved as noted Answered
MC S 11/28/2022 11/28/2022 B - Approved as noted Answered
CO S 11/28/2022 11/28/2022 B - Approved as noted Answered
CO S 11/28/2022 11/28/2022 B - Approved as noted Answered
PC S 11/28/2022 11/28/2022 B - Approved as noted Answered
PC S 11/28/2022 11/28/2022 C - Revise & Resubmit Answered
PC S 11/28/2022 11/28/2022 C - Revise & Resubmit Answered
CO S 11/28/2022 11/28/2022 B - Approved as noted Answered
CO S 11/28/2022 11/28/2022 B - Approved as noted Answered
CO S 11/28/2022 11/28/2022 B - Approved as noted Answered
LM S 11/28/2022 11/28/2022 B - Approved as noted Answered
CO S 11/28/2022 11/27/2022 B - Approved as noted Answered
CO S 11/28/2022 11/27/2022 B - Approved as noted Answered
PC P 11/28/2022 11/28/2022 B - Approved as noted Answered
CC LC 11/28/2022 11/27/2022 B - Approved as noted Answered
CC LC 11/28/2022 11/27/2022 B - Approved as noted Answered
PG LC 11/28/2022 11/27/2022 B - Approved as noted Answered
PG LC 11/28/2022 11/27/2022 B - Approved as noted Answered
LM LC 11/27/2022 11/26/2022 C - Revise & Resubmit Answered
CF E 11/27/2022 11/26/2022 B - Approved as noted Answered
SM E 11/27/2022 11/26/2022 B - Approved as noted Answered
LM S 11/28/2022 11/27/2022 B - Approved as noted Answered
CO S 11/28/2022 11/27/2022 B - Approved as noted Answered
CO S 11/28/2022 11/27/2022 B - Approved as noted Answered
CO S 11/28/2022 11/27/2022 B - Approved as noted Answered
CO S 11/28/2022 11/27/2022 B - Approved as noted Answered
CO S 11/27/2022 11/27/2022 B - Approved as noted Answered
CO SU 11/27/2022 11/26/2022 B - Approved as noted Answered
EC C 11/27/2022 11/26/2022 B - Approved as noted Answered
MC C 11/27/2022 11/26/2022 B - Approved as noted Answered
MC C 11/27/2022 11/26/2022 B - Approved as noted Answered
CO C 12/6/2022 12/5/2022 B - Approved as noted Answered
CO C 11/27/2022 11/26/2022 B - Approved as noted Answered
CO C 11/27/2022 11/26/2022 B - Approved as noted Answered
SW C 11/22/2022 11/21/2022 B - Approved as noted Answered
CO S 11/27/2022 11/26/2022 B - Approved as noted Answered
CO S 11/27/2022 11/26/2022 B - Approved as noted Answered
CO S 11/27/2022 11/26/2022 B - Approved as noted Answered
CO S 11/27/2022 11/26/2022 B - Approved as noted Answered
CO S 11/27/2022 11/26/2022 B - Approved as noted Answered
CO S 11/27/2022 11/26/2022 B - Approved as noted Answered
CC S 11/27/2022 11/26/2022 B - Approved as noted Answered
CO S 11/27/2022 11/26/2022 B - Approved as noted Answered
CO S 11/27/2022 11/26/2022 B - Approved as noted Answered
CO S 11/27/2022 11/26/2022 B - Approved as noted Answered
CO S 11/27/2022 11/26/2022 B - Approved as noted Answered
CO S 11/27/2022 11/26/2022 B - Approved as noted Answered
CO S 11/27/2022 11/26/2022 B - Approved as noted Answered
CO S 11/27/2022 11/26/2022 B - Approved as noted Answered
WG C 11/27/2022 11/26/2022 B - Approved as noted Answered
WG LS 11/27/2022 11/26/2022 B - Approved as noted Answered
MB A 11/28/2022 11/26/2022 B - Approved as noted Answered
MB A 11/27/2022 11/26/2022 B - Approved as noted Answered
MB A 11/27/2022 11/26/2022 B - Approved as noted Answered
PG C 11/27/2022 11/26/2022 B - Approved as noted Answered
PG C 11/27/2022 11/26/2022 B - Approved as noted Answered
TG C 11/27/2022 11/26/2022 B - Approved as noted Answered
WG C 11/27/2022 11/26/2022 B - Approved as noted Answered
WG C 11/27/2022 11/26/2022 B - Approved as noted Answered
WG C 11/27/2022 11/26/2022 B - Approved as noted Answered
WG C 11/27/2022 11/26/2022 B - Approved as noted Answered
TG S 11/26/2022 11/24/2022 B - Approved as noted Answered
WG C 11/26/2022 11/24/2022 B - Approved as noted Answered
WG C 11/26/2022 11/24/2022 B - Approved as noted Answered
WG C 11/29/2022 11/24/2022 B - Approved as noted Answered
WG C 11/26/2022 11/24/2022 B - Approved as noted Answered
WG C 11/26/2022 11/24/2022 B - Approved as noted Answered
CO SS 11/23/2022 11/22/2022 B - Approved as noted Answered
SM A 11/23/2022 11/22/2022 B - Approved as noted Answered
SM A 11/23/2022 11/22/2022 B - Approved as noted Answered
EC C 11/24/2022 11/22/2022 B - Approved as noted Answered
NA C 12/3/2022 11/24/2022 B - Approved as noted Answered
NA C 12/3/2022 11/24/2022 B - Approved as noted Answered
NG C 11/26/2022 11/24/2022 B - Approved as noted Answered
CO S 11/23/2022 11/22/2022 B - Approved as noted Answered
CO S 11/23/2022 11/22/2022 B - Approved as noted Answered
CO S 11/23/2022 11/22/2022 B - Approved as noted Answered
CO S 11/23/2022 11/22/2022 B - Approved as noted Answered
NA S 11/23/2022 11/22/2022 B - Approved as noted Answered
CO S 11/23/2022 11/22/2022 B - Approved as noted Answered
CO S 11/23/2022 11/22/2022 B - Approved as noted Answered
VG S 11/26/2022 11/24/2022 B - Approved as noted Answered
CO SU 11/23/2022 11/22/2022 B - Approved as noted Answered
CO SU 11/23/2022 11/22/2022 B - Approved as noted Answered
NA SU 11/23/2022 11/22/2022 B - Approved as noted Answered
CO SU 11/23/2022 11/22/2022 B - Approved as noted Answered
VG SU 11/23/2022 11/22/2022 B - Approved as noted Answered
CO SU 11/27/2022 11/26/2022 B - Approved as noted Answered
CO SU 11/27/2022 11/26/2022 C - Revise & Resubmit Answered
MC SU 11/26/2022 11/24/2022 B - Approved as noted Answered
SM SU 11/26/2022 11/24/2022 B - Approved as noted Answered
EC SU 11/26/2022 11/24/2022 B - Approved as noted Answered
EC SU 11/26/2022 11/24/2022 B - Approved as noted Answered
CO SU 11/26/2022 11/24/2022 B - Approved as noted Answered
SM SU 11/26/2022 11/24/2022 B - Approved as noted Answered
EC SU 11/26/2022 11/24/2022 B - Approved as noted Answered
EC SU 11/26/2022 11/24/2022 B - Approved as noted Answered
SW C 11/29/2022 11/26/2022 B - Approved as noted Answered
PC S 11/28/2022 11/27/2022 B - Approved as noted Answered
SW C 11/27/2022 11/26/2022 B - Approved as noted Answered
MC S 11/26/2022 11/24/2022 B - Approved as noted Answered
SW C 11/27/2022 11/26/2022 B - Approved as noted Answered
SW C 11/27/2022 11/26/2022 B - Approved as noted Answered
SW C 11/27/2022 11/26/2022 B - Approved as noted Answered
SW C 11/27/2022 11/26/2022 B - Approved as noted Answered
SW C 11/27/2022 11/26/2022 B - Approved as noted Answered
SW C 11/27/2022 11/26/2022 B - Approved as noted Answered
SW LS 11/23/2022 11/22/2022 B - Approved as noted Answered
SW C 11/23/2022 11/22/2022 B - Approved as noted Answered
SW C 11/23/2022 11/22/2022 B - Approved as noted Answered
SW C 11/23/2022 11/22/2022 B - Approved as noted Answered
SW C 11/24/2022 11/22/2022 B - Approved as noted Answered
SW C 11/24/2022 11/22/2022 B - Approved as noted Answered
SW C 11/29/2022 11/22/2022 B - Approved as noted Answered
SW C 11/24/2022 11/22/2022 B - Approved as noted Answered
SW C 11/23/2022 10/22/2022 B - Approved as noted Answered
SW C 11/24/2022 11/22/2022 B - Approved as noted Answered
SW C 11/24/2022 11/22/2022 B - Approved as noted Answered
SW C 11/24/2022 11/22/2022 B - Approved as noted Answered
SW C 11/24/2022 11/22/2022 B - Approved as noted Answered
SW C 11/23/2022 11/22/2022 B - Approved as noted Answered
SW C 11/24/2022 11/22/2022 B - Approved as noted Answered
PA C 11/23/2022 11/22/2022 B - Approved as noted Answered
SW C 11/24/2022 11/22/2022 B - Approved as noted Answered
SW C 11/24/2022 11/22/2022 B - Approved as noted Answered
PA C 11/23/2022 11/22/2022 B - Approved as noted Answered
SW C 11/24/2022 11/22/2022 B - Approved as noted Answered
SW C 11/24/2022 11/22/2022 B - Approved as noted Answered
SW C 11/24/2022 11/22/2022 B - Approved as noted Answered
SW C 11/19/2022 11/17/2022 B - Approved as noted Answered
SW C 11/26/2022 11/24/2022 C - Revise & Resubmit Answered
PA C 11/26/2022 11/24/2022 B - Approved as noted Answered
SW C 11/26/2022 11/24/2022 B - Approved as noted Answered
SW C 11/26/2022 11/24/2022 B - Approved as noted Answered
SW C 11/26/2022 11/24/2022 B - Approved as noted Answered
SW C 11/26/2022 11/24/2022 B - Approved as noted Answered
SW C 11/26/2022 11/24/2022 B - Approved as noted Answered
RD C 11/26/2022 11/24/2022 C - Revise & Resubmit Answered
SW C 11/15/2022 11/14/2022 B - Approved as noted Answered
MC S 11/26/2022 11/24/2022 B - Approved as noted Answered
MC S 11/26/2022 11/24/2022 B - Approved as noted Answered
SM S 11/26/2022 11/24/2022 B - Approved as noted Answered
EC S 11/26/2022 11/24/2022 B - Approved as noted Answered
EC S 11/26/2022 11/24/2022 B - Approved as noted Answered
CO S 11/26/2022 11/24/2022 B - Approved as noted Answered
CO S 11/26/2022 11/24/2022 B - Approved as noted Answered
EC S 11/26/2022 11/24/2022 B - Approved as noted Answered
CO S 11/26/2022 11/24/2022 B - Approved as noted Answered
CO S 11/26/2022 11/24/2022 B - Approved as noted Answered
SM S 11/26/2022 11/24/2022 B - Approved as noted Answered
SM S 11/26/2022 11/24/2022 B - Approved as noted Answered
CO S 11/26/2022 11/24/2022 C - Revise & Resubmit Answered
CO S 11/26/2022 11/24/2022 B - Approved as noted Answered
EC S 11/26/2022 11/24/2022 B - Approved as noted Answered
EC S 11/26/2022 11/24/2022 B - Approved as noted Answered
PC E 11/21/2022 11/20/2022 B - Approved as noted Answered
SW E 11/21/2022 11/20/2022 B - Approved as noted Answered
SW E 11/21/2022 11/20/2022 B - Approved as noted Answered
LM E 11/22/2022 11/21/2022 B - Approved as noted Answered
LM LC 11/22/2022 11/21/2022 B - Approved as noted Answered
TT A 11/23/2022 11/22/2022 B - Approved as noted Answered
TT A 11/23/2022 11/22/2022 B - Approved as noted Answered
WG C 11/23/2022 11/22/2022 B - Approved as noted Answered
PG C 11/24/2022 11/22/2022 B - Approved as noted Answered
PG C 11/24/2022 11/22/2022 B - Approved as noted Answered
WG SU 11/23/2022 11/22/2022 B - Approved as noted Answered
SW LC 11/21/2022 11/20/2022 B - Approved as noted Answered
SW LC 11/21/2022 11/20/2022 B - Approved as noted Answered
TG C 11/22/2022 11/21/2022 B - Approved as noted Answered
WG C 12/1/2022 11/30/2022 B - Approved as noted Answered
WG C 11/22/2022 11/21/2022 B - Approved as noted Answered
WG C 11/22/2022 11/21/2022 B - Approved as noted Answered
TB S 11/26/2022 11/21/2022 B - Approved as noted Answered
TB SU 11/22/2022 11/21/2022 B - Approved as noted Answered
PG LS 11/24/2022 11/21/2022 B - Approved as noted Answered
PG LS 11/27/2022 11/21/2022 B - Approved as noted Answered
NA S 11/23/2022 11/22/2022 B - Approved as noted Answered
NA S 11/23/2022 11/22/2022 B - Approved as noted Answered
NA S 11/23/2022 11/22/2022 B - Approved as noted Answered
CO S 11/23/2022 11/22/2022 B - Approved as noted Answered
VG S 11/23/2022 11/22/2022 B - Approved as noted Answered
CC S 11/23/2022 11/22/2022 B - Approved as noted Answered
VG S 11/23/2022 11/22/2022 B - Approved as noted Answered
VG S 11/23/2022 11/22/2022 B - Approved as noted Answered
VG S 11/23/2022 11/22/2022 B - Approved as noted Answered
VG S 11/23/2022 11/22/2022 B - Approved as noted Answered
CO S 11/23/2022 11/22/2022 B - Approved as noted Answered
CO S 11/23/2022 11/22/2022 B - Approved as noted Answered
CO S 11/23/2022 11/22/2022 B - Approved as noted Answered
CO S 11/28/2022 11/27/2022 B - Approved as noted Answered
SW M 11/23/2022 11/22/2022 B - Approved as noted Answered
PA C 11/22/2022 11/21/2022 B - Approved as noted Answered
SW C 11/22/2022 11/21/2022 B - Approved as noted Answered
SW C 11/22/2022 11/21/2022 B - Approved as noted Answered
SW C 11/22/2022 11/21/2022 B - Approved as noted Answered
SW C 11/22/2022 11/21/2022 B - Approved as noted Answered
SW C 11/22/2022 11/21/2022 B - Approved as noted Answered
SW C 11/22/2022 11/21/2022 B - Approved as noted Answered
SW C 11/22/2022 11/21/2022 B - Approved as noted Answered
SW C 11/22/2022 11/21/2022 B - Approved as noted Answered
SW C 11/22/2022 11/21/2022 B - Approved as noted Answered
SW C 11/21/2022 11/20/2022 B - Approved as noted Answered
SW C 11/21/2022 11/20/2022 C - Revise & Resubmit Answered
SW C 11/21/2022 11/20/2022 B - Approved as noted Answered
SW C 11/21/2022 11/20/2022 B - Approved as noted Answered
SW C 11/21/2022 11/20/2022 B - Approved as noted Answered
SW C 11/21/2022 11/20/2022 B - Approved as noted Answered
SW C 11/21/2022 11/20/2022 B - Approved as noted Answered
SW C 11/21/2022 11/20/2022 B - Approved as noted Answered
SW C 11/21/2022 11/20/2022 B - Approved as noted Answered
SW C 11/21/2022 11/20/2022 B - Approved as noted Answered
SW C 11/21/2022 11/20/2022 B - Approved as noted Answered
SW C 11/21/2022 11/20/2022 B - Approved as noted Answered
SW C 11/21/2022 11/20/2022 B - Approved as noted Answered
SW C 11/21/2022 11/20/2022 B - Approved as noted Answered
SW C 11/21/2022 11/20/2022 B - Approved as noted Answered
SW C 11/21/2022 11/20/2022 B - Approved as noted Answered
SW C 11/21/2022 11/20/2022 B - Approved as noted Answered
SW C 11/21/2022 11/20/2022 B - Approved as noted Answered
SW C 11/21/2022 11/20/2022 B - Approved as noted Answered
SW C 11/21/2022 11/20/2022 B - Approved as noted Answered
MC C 11/22/2022 11/21/2022 B - Approved as noted Answered
MC C 11/22/2022 11/21/2022 B - Approved as noted Answered
MC C 11/22/2022 11/21/2022 B - Approved as noted Answered
JG C 11/22/2022 11/21/2022 B - Approved as noted Answered
SW LS 11/19/2022 11/19/2022 B - Approved as noted Answered
CO C 11/22/2022 11/21/2022 B - Approved as noted Answered
JG C 11/22/2022 11/21/2022 B - Approved as noted Answered
SM A 11/22/2022 11/21/2022 B - Approved as noted Answered
VG SU 11/23/2022 11/22/2022 B - Approved as noted Answered
CO SU 11/22/2022 11/21/2022 B - Approved as noted Answered
CO SU 11/22/2022 11/21/2022 B - Approved as noted Answered
SW C 11/22/2022 11/21/2022 B - Approved as noted Answered
SW C 11/22/2022 11/21/2022 B - Approved as noted Answered
NA S 11/16/2022 11/15/2022 C - Revise & Resubmit Answered
SW C 11/21/2022 11/20/2022 B - Approved as noted Answered
SW C 11/21/2022 11/20/2022 B - Approved as noted Answered
SW C 11/21/2022 11/20/2022 B - Approved as noted Answered
PA C 11/21/2022 11/20/2022 B - Approved as noted Answered
PG S 11/21/2022 11/20/2022 B - Approved as noted Answered
FC A 11/21/2022 11/20/2022 B - Approved as noted Answered
TT A 11/21/2022 11/20/2022 B - Approved as noted Answered
AG A 11/22/2022 11/20/2022 B - Approved as noted Answered
AG A 11/21/2022 11/20/2022 B - Approved as noted Answered
AG A 11/21/2022 11/20/2022 B - Approved as noted Answered
WG SU 11/21/2022 11/20/2022 B - Approved as noted Answered
LM LC 11/21/2022 11/20/2022 C - Revise & Resubmit Answered
PC LC 11/21/2022 11/20/2022 B - Approved as noted Answered
WG C 11/21/2022 11/20/2022 B - Approved as noted Answered
PG C 11/21/2022 11/20/2022 B - Approved as noted Answered
TG C 11/21/2022 11/20/2022 B - Approved as noted Answered
WG C 11/26/2022 11/20/2022 B - Approved as noted Answered
WG C 11/21/2022 11/20/2022 B - Approved as noted Answered
EC S 11/22/2022 11/21/2022 B - Approved as noted Answered
VG S 11/22/2022 11/21/2022 B - Approved as noted Answered
LM S 11/22/2022 11/21/2022 B - Approved as noted Answered
CO S 11/22/2022 11/21/2022 B - Approved as noted Answered
CO S 11/22/2022 11/21/2022 B - Approved as noted Answered
CO S 11/22/2022 11/21/2022 B - Approved as noted Answered
CO S 11/22/2022 11/21/2022 B - Approved as noted Answered
CO S 11/22/2022 11/21/2022 B - Approved as noted Answered
CO SS 11/21/2022 12/20/2022 B - Approved as noted Answered
CO A 11/17/2022 11/16/2022 B - Approved as noted Answered
CO A 11/17/2022 11/16/2022 C - Revise & Resubmit Answered
CO A 11/17/2022 11/16/2022 B - Approved as noted Answered
CO A 11/17/2022 11/16/2022 B - Approved as noted Answered
CO A 11/17/2022 11/16/2022 B - Approved as noted Answered
SM S 11/21/2022 11/20/2022 B - Approved as noted Answered
CO C 11/21/2022 11/20/2022 B - Approved as noted Answered
CC C 11/21/2022 11/20/2022 C - Revise & Resubmit Answered
CO C 11/21/2022 11/20/2022 B - Approved as noted Answered
CO C 11/21/2022 11/20/2022 B - Approved as noted Answered
SM A 11/21/2022 11/20/2022 B - Approved as noted Answered
SM A 11/21/2022 11/20/2022 B - Approved as noted Answered
SM A 11/21/2022 11/20/2022 B - Approved as noted Answered
SM A 11/21/2022 11/20/2022 B - Approved as noted Answered
CO SU 11/21/2022 11/20/2022 B - Approved as noted Answered
LM SU 11/21/2022 11/20/2022 B - Approved as noted Answered
MC SU 11/21/2022 11/20/2022 B - Approved as noted Answered
VG SU 11/21/2022 11/20/2022 B - Approved as noted Answered
CO S 11/21/2022 11/20/2022 B - Approved as noted Answered
SM S 11/21/2022 11/20/2022 B - Approved as noted Answered
CO S 11/21/2022 11/20/2022 B - Approved as noted Answered
LM S 11/21/2022 11/20/2022 B - Approved as noted Answered
CO S 11/21/2022 11/20/2022 B - Approved as noted Answered
CO S 11/21/2022 11/20/2022 B - Approved as noted Answered
CO S 11/21/2022 11/20/2022 B - Approved as noted Answered
CO S 11/21/2022 11/20/2022 B - Approved as noted Answered
CO S 11/21/2022 11/20/2022 B - Approved as noted Answered
CO S 11/21/2022 11/20/2022 B - Approved as noted Answered
CO S 11/21/2022 11/20/2022 B - Approved as noted Answered
PC S 11/21/2022 11/20/2022 B - Approved as noted Answered
PC S 11/21/2022 11/20/2022 B - Approved as noted Answered
PC S 11/21/2022 11/20/2022 B - Approved as noted Answered
MC S 11/21/2022 11/20/2022 B - Approved as noted Answered
MC S 11/21/2022 11/20/2022 B - Approved as noted Answered
CO S 11/22/2022 11/21/2022 B - Approved as noted Answered
CO S 11/21/2022 11/20/2022 B - Approved as noted Answered
VG S 11/21/2022 11/20/2022 B - Approved as noted Answered
VG S 11/21/2022 11/20/2022 B - Approved as noted Answered
VG S 11/21/2022 11/20/2022 B - Approved as noted Answered
SW M 11/21/2022 11/20/2022 B - Approved as noted Answered
SW C 11/21/2022 11/20/2022 B - Approved as noted Answered
SW C 11/21/2022 11/20/2022 B - Approved as noted Answered
SW C 11/21/2022 11/20/2022 B - Approved as noted Answered
SW C 11/21/2022 11/20/2022 B - Approved as noted Answered
SW LS 11/24/2022 11/19/2022 B - Approved as noted Answered
SW C 11/20/2022 11/19/2022 B - Approved as noted Answered
SW C 11/20/2022 11/19/2022 B - Approved as noted Answered
SW C 11/20/2022 11/19/2022 B - Approved as noted Answered
SW C 11/20/2022 11/19/2022 B - Approved as noted Answered
SW C 11/20/2022 11/19/2022 B - Approved as noted Answered
SW C 11/20/2022 11/19/2022 B - Approved as noted Answered
SW C 11/20/2022 11/19/2022 B - Approved as noted Answered
SW C 11/20/2022 11/19/2022 B - Approved as noted Answered
SW C 11/20/2022 11/19/2022 B - Approved as noted Answered
SW C 11/20/2022 11/19/2022 B - Approved as noted Answered
SW C 11/20/2022 11/19/2022 B - Approved as noted Answered
SW C 11/20/2022 11/19/2022 B - Approved as noted Answered
SW C 11/20/2022 11/19/2022 B - Approved as noted Answered
SW C 11/20/2022 11/19/2022 B - Approved as noted Answered
SW C 11/20/2022 11/19/2022 B - Approved as noted Answered
TT E 11/17/2022 11/16/2022 C - Revise & Resubmit Answered
TT E 11/17/2022 11/16/2022 C - Revise & Resubmit Answered
TT LC 11/17/2022 11/16/2022 C - Revise & Resubmit Answered
TT LC 11/17/2022 11/16/2022 C - Revise & Resubmit Answered
TT LC 11/17/2022 11/16/2022 C - Revise & Resubmit Answered
TT LC 11/17/2022 11/16/2022 C - Revise & Resubmit Answered
CG LC 11/20/2022 11/19/2022 B - Approved as noted Answered
LM LC 11/20/2022 11/19/2022 C - Revise & Resubmit Answered
LM LC 11/20/2022 11/19/2022 B - Approved as noted Answered
SW E 11/15/2022 11/14/2022 B - Approved as noted Answered
WG E 11/19/2022 11/17/2022 B - Approved as noted Answered
CF E 11/17/2022 11/16/2022 B - Approved as noted Answered
WG E 11/20/2022 11/15/2022 C - Revise & Resubmit Answered
WG LC 11/19/2022 11/17/2022 B - Approved as noted Answered
WG LC 11/19/2022 11/17/2022 B - Approved as noted Answered
WG LC 11/17/2022 11/16/2022 B - Approved as noted Answered
TB E 11/17/2022 11/16/2022 B - Approved as noted Answered
SW C 11/19/2022 11/19/2022 B - Approved as noted Answered
SW C 11/19/2022 11/19/2022 B - Approved as noted Answered
SW C 11/19/2022 11/19/2022 C - Revise & Resubmit Answered
SW C 11/19/2022 11/19/2022 B - Approved as noted Answered
PA C 11/19/2022 11/19/2022 C - Revise & Resubmit Answered
PA C 11/19/2022 11/19/2022 C - Revise & Resubmit Answered
SW C 11/19/2022 11/19/2022 B - Approved as noted Answered
SW C 11/19/2022 11/19/2022 B - Approved as noted Answered
TG LS 11/20/2022 11/19/2022 B - Approved as noted Answered
WG S 11/20/2022 11/19/2022 B - Approved as noted Answered
WG S 11/20/2022 11/19/2022 B - Approved as noted Answered
WG C 11/20/2022 11/19/2022 B - Approved as noted Answered
WG C 11/20/2022 11/19/2022 B - Approved as noted Answered
PG C 11/20/2022 11/19/2022 B - Approved as noted Answered
PG C 11/20/2022 11/19/2022 B - Approved as noted Answered
WG C 11/20/2022 11/19/2022 B - Approved as noted Answered
SW A 11/19/2022 11/19/2022 C - Revise & Resubmit Answered
SW A 11/19/2022 11/19/2022 C - Revise & Resubmit Answered
CO S 11/20/2022 11/19/2022 B - Approved as noted Answered
PG C 11/19/2022 11/19/2022 B - Approved as noted Answered
CO S 11/20/2022 11/19/2022 B - Approved as noted Answered
PG C 11/19/2022 11/19/2022 B - Approved as noted Answered
CO S 11/20/2022 11/19/2022 B - Approved as noted Answered
PG C 11/19/2022 11/19/2022 B - Approved as noted Answered
CO S 11/20/2022 11/19/2022 B - Approved as noted Answered
PG C 11/19/2022 11/19/2022 B - Approved as noted Answered
CO S 11/20/2022 11/19/2022 B - Approved as noted Answered
CO S 11/20/2022 11/19/2022 B - Approved as noted Answered
PG LS 11/24/2022 11/17/2022 B - Approved as noted Answered
PG LS 11/24/2022 11/17/2022 B - Approved as noted Answered
CO SU 11/19/2022 11/19/2022 B - Approved as noted Answered
PG LS 11/24/2022 11/17/2022 B - Approved as noted Answered
LM SU 11/19/2022 11/19/2022 B - Approved as noted Answered
PG LS 11/24/2022 11/17/2022 B - Approved as noted Answered
LG C 11/19/2022 11/19/2022 C - Revise & Resubmit Answered
EC C 11/20/2022 11/19/2022 B - Approved as noted Answered
MC C 11/20/2022 11/19/2022 B - Approved as noted Answered
JG C 11/20/2022 11/19/2022 B - Approved as noted Answered
MC C 11/20/2022 11/19/2022 B - Approved as noted Answered
MC C 11/20/2022 11/19/2022 B - Approved as noted Answered
CO C 11/20/2022 11/19/2022 B - Approved as noted Answered
EC C 11/19/2022 11/19/2022 B - Approved as noted Answered
PG LS 11/24/2022 11/17/2022 B - Approved as noted Answered
PG LS 11/24/2022 11/17/2022 B - Approved as noted Answered
CO S 11/19/2022 11/19/2022 B - Approved as noted Answered
CO S 11/19/2022 11/19/2022 B - Approved as noted Answered
PC S 11/20/2022 11/19/2022 B - Approved as noted Answered
CO S 11/20/2022 11/19/2022 B - Approved as noted Answered
LM S 11/20/2022 11/19/2022 B - Approved as noted Answered
EC SU 11/12/2022 11/10/2022 B - Approved as noted Answered
EC S 11/20/2022 11/19/2022 B - Approved as noted Answered
CO S 11/19/2022 11/19/2022 B - Approved as noted Answered
PC P 11/24/2022 11/19/2022 B - Approved as noted Answered
SW M 11/19/2022 11/17/2022 B - Approved as noted Answered
SM S 11/22/2022 11/19/2022 B - Approved as noted Answered
SW M 11/19/2022 11/17/2022 B - Approved as noted Answered
CO S 11/19/2022 11/19/2022 C - Revise & Resubmit Answered
CO S 11/7/2022 11/6/2022 B - Approved as noted Answered
NA S 11/9/2022 11/8/2022 B - Approved as noted Answered
NA S 11/9/2022 11/8/2022 B - Approved as noted Answered
CO S 11/15/2022 11/14/2022 B - Approved as noted Answered
SW C 11/24/2022 11/17/2022 B - Approved as noted Answered
SW C 11/24/2022 11/17/2022 B - Approved as noted Answered
SW C 11/19/2022 11/17/2022 B - Approved as noted Answered
SW C 11/19/2022 11/17/2022 B - Approved as noted Answered
SW C 11/19/2022 11/17/2022 B - Approved as noted Answered
SW C 11/19/2022 11/17/2022 B - Approved as noted Answered
SW C 11/19/2022 11/17/2022 B - Approved as noted Answered
SW C 11/19/2022 11/17/2022 B - Approved as noted Answered
SW C 11/19/2022 11/17/2022 B - Approved as noted Answered
SW C 11/26/2022 11/17/2022 B - Approved as noted Answered
SW C 11/19/2022 11/17/2022 B - Approved as noted Answered
SW C 11/19/2022 11/17/2022 B - Approved as noted Answered
SW C 11/19/2022 11/17/2022 B - Approved as noted Answered
SW C 11/19/2022 11/17/2022 B - Approved as noted Answered
CO C 11/19/2022 11/17/2022 B - Approved as noted Answered
CO C 11/19/2022 11/17/2022 B - Approved as noted Answered
CO C 11/19/2022 11/17/2022 B - Approved as noted Answered
EC C 11/19/2022 11/17/2022 B - Approved as noted Answered
EC C 11/19/2022 11/17/2022 B - Approved as noted Answered
CO A 11/15/2022 11/14/2022 B - Approved as noted Answered
CO SU 11/20/2022 11/19/2022 B - Approved as noted Answered
CO A 11/15/2022 11/14/2022 B - Approved as noted Answered
CO SU 11/20/2022 11/19/2022 B - Approved as noted Answered
CO A 11/15/2022 11/14/2022 B - Approved as noted Answered
CC SU 11/19/2022 11/17/2022 B - Approved as noted Answered
CO SU 11/20/2022 11/19/2022 B - Approved as noted Answered
VG SU 11/19/2022 11/17/2022 B - Approved as noted Answered
LM S 11/20/2022 11/19/2022 B - Approved as noted Answered
LM S 11/19/2022 11/17/2022 B - Approved as noted Answered
CC S 11/19/2022 11/17/2022 B - Approved as noted Answered
VG S 11/19/2022 11/17/2022 B - Approved as noted Answered
CO S 11/19/2022 11/17/2022 B - Approved as noted Answered
CO S 11/20/2022 11/19/2022 B - Approved as noted Answered
VG S 11/19/2022 11/17/2022 B - Approved as noted Answered
VG S 11/19/2022 11/17/2022 B - Approved as noted Answered
SW C 11/16/2022 11/15/2022 B - Approved as noted Answered
SW C 11/16/2022 11/15/2022 B - Approved as noted Answered
SW C 11/26/2022 11/15/2022 B - Approved as noted Answered
SW C 11/16/2022 11/15/2022 B - Approved as noted Answered
SW C 11/16/2022 11/15/2022 B - Approved as noted Answered
SW C 11/16/2022 11/15/2022 B - Approved as noted Answered
SW C 11/16/2022 11/15/2022 B - Approved as noted Answered
SW C 11/16/2022 11/15/2022 B - Approved as noted Answered
SW C 11/16/2022 11/15/2022 B - Approved as noted Answered
SW C 11/16/2022 11/19/2022 B - Approved as noted Answered
SW C 11/16/2022 11/15/2022 B - Approved as noted Answered
SW C 11/16/2022 11/15/2022 B - Approved as noted Answered
SW C 11/16/2022 11/15/2022 B - Approved as noted Answered
SW C 11/17/2022 11/16/2022 B - Approved as noted Answered
SW LS 11/24/2022 11/14/2022 B - Approved as noted Answered
SW C 11/15/2022 11/14/2022 B - Approved as noted Answered
SW C 11/15/2022 11/14/2022 B - Approved as noted Answered
SW C 11/15/2022 11/14/2022 B - Approved as noted Answered
SW C 11/15/2022 11/14/2022 B - Approved as noted Answered
SW C 11/15/2022 11/14/2022 B - Approved as noted Answered
SW C 11/15/2022 11/14/2022 B - Approved as noted Answered
SW C 11/15/2022 11/14/2022 B - Approved as noted Answered
SW C 11/15/2022 11/14/2022 B - Approved as noted Answered
SW C 11/15/2022 11/14/2022 B - Approved as noted Answered
SW C 11/15/2022 11/14/2022 B - Approved as noted Answered
SW C 11/15/2022 11/14/2022 B - Approved as noted Answered
SW C 11/15/2022 11/14/2022 B - Approved as noted Answered
SW C 11/15/2022 11/14/2022 B - Approved as noted Answered
SW C 11/15/2022 11/14/2022 B - Approved as noted Answered
SW C 11/15/2022 11/14/2022 B - Approved as noted Answered
SW C 11/15/2022 11/14/2022 B - Approved as noted Answered
SW C 11/15/2022 11/14/2022 B - Approved as noted Answered
SW C 11/15/2022 11/14/2022 B - Approved as noted Answered
SW C 11/15/2022 11/14/2022 B - Approved as noted Answered
SW LS 11/17/2022 11/16/2022 B - Approved as noted Answered
SW C 11/17/2022 11/16/2022 B - Approved as noted Answered
SW C 11/17/2022 11/16/2022 B - Approved as noted Answered
SW C 11/17/2022 11/16/2022 B - Approved as noted Answered
SW C 11/17/2022 11/16/2022 B - Approved as noted Answered
SW C 11/17/2022 11/16/2022 C - Revise & Resubmit Answered
SW C 11/17/2022 11/16/2022 B - Approved as noted Answered
SW C 11/17/2022 11/16/2022 B - Approved as noted Answered
SW C 11/17/2022 11/16/2022 B - Approved as noted Answered
SW C 11/17/2022 11/16/2022 B - Approved as noted Answered
SW C 11/17/2022 11/16/2022 B - Approved as noted Answered
SW C 11/17/2022 11/16/2022 B - Approved as noted Answered
SW C 11/24/2022 11/16/2022 B - Approved as noted Answered
SW C 11/24/2022 11/16/2022 B - Approved as noted Answered
SW C 11/17/2022 11/16/2022 B - Approved as noted Answered
SW C 11/17/2022 11/16/2022 B - Approved as noted Answered
SW C 11/17/2022 11/16/2022 B - Approved as noted Answered
SW C 11/17/2022 11/16/2022 B - Approved as noted Answered
SW C 11/17/2022 11/16/2022 B - Approved as noted Answered
SW C 11/17/2022 11/16/2022 B - Approved as noted Answered
SW C 11/17/2022 11/16/2022 B - Approved as noted Answered
CF LC 11/17/2022 11/16/2022 B - Approved as noted Answered
CF LC 11/17/2022 11/16/2022 B - Approved as noted Answered
WG LS 11/17/2022 11/16/2022 B - Approved as noted Answered
PG C 11/17/2022 11/16/2022 B - Approved as noted Answered
PG C 11/17/2022 11/16/2022 B - Approved as noted Answered
WG C 11/17/2022 11/16/2022 B - Approved as noted Answered
WG C 11/17/2022 11/16/2022 B - Approved as noted Answered
PG C 11/17/2022 11/16/2022 B - Approved as noted Answered
PG C 11/17/2022 11/16/2022 B - Approved as noted Answered
CO S 11/17/2022 11/16/2022 B - Approved as noted Answered
CO S 11/22/2022 11/21/2022 B - Approved as noted Answered
CO S 11/17/2022 11/16/2022 B - Approved as noted Answered
CO S 11/17/2022 11/16/2022 B - Approved as noted Answered
CO S 11/17/2022 11/16/2022 B - Approved as noted Answered
CO S 11/17/2022 11/16/2022 B - Approved as noted Answered
CO S 11/17/2022 11/16/2022 B - Approved as noted Answered
CO S 11/17/2022 11/16/2022 B - Approved as noted Answered
CO S 11/17/2022 11/16/2022 B - Approved as noted Answered
JG C 11/19/2022 11/17/2022 B - Approved as noted Answered
CO C 11/17/2022 11/16/2022 B - Approved as noted Answered
CO SU 11/17/2022 11/16/2022 B - Approved as noted Answered
CO SU 11/16/2022 11/15/2022 B - Approved as noted Answered
CO SS 11/16/2022 11/15/2022 B - Approved as noted Answered
CO S 11/17/2022 11/16/2022 B - Approved as noted Answered
CO S 11/17/2022 11/16/2022 B - Approved as noted Answered
CO S 11/17/2022 11/16/2022 B - Approved as noted Answered
CO S 11/17/2022 11/16/2022 B - Approved as noted Answered
NA S 11/17/2022 11/16/2022 B - Approved as noted Answered
CO S 11/17/2022 11/16/2022 B - Approved as noted Answered
CO A 11/17/2022 11/16/2022 B - Approved as noted Answered
CO A 11/17/2022 11/16/2022 B - Approved as noted Answered
CO S 11/17/2022 11/16/2022 B - Approved as noted Answered
VG S 11/17/2022 11/16/2022 B - Approved as noted Answered
VG S 11/17/2022 11/16/2022 B - Approved as noted Answered
VG S 11/17/2022 11/16/2022 B - Approved as noted Answered
CO S 11/17/2022 11/16/2022 B - Approved as noted Answered
CO S 11/17/2022 11/16/2022 B - Approved as noted Answered
CO S 11/17/2022 11/16/2022 B - Approved as noted Answered
CO S 11/17/2022 11/16/2022 B - Approved as noted Answered
CO S 11/17/2022 11/16/2022 B - Approved as noted Answered
CO C 11/17/2022 11/16/2022 B - Approved as noted Answered
MC C 11/17/2022 11/16/2022 B - Approved as noted Answered
MC C 11/17/2022 11/16/2022 B - Approved as noted Answered
EC C 11/16/2022 11/15/2022 B - Approved as noted Answered
CG C 11/16/2022 11/15/2022 C - Revise & Resubmit Answered
EC C 11/16/2022 11/15/2022 B - Approved as noted Answered
CO C 11/16/2022 11/15/2022 B - Approved as noted Answered
CO S 11/16/2022 11/15/2022 B - Approved as noted Answered
CO S 11/16/2022 11/15/2022 B - Approved as noted Answered
CO S 11/16/2022 11/15/2022 B - Approved as noted Answered
CO S 11/16/2022 11/15/2022 B - Approved as noted Answered
CO S 11/16/2022 11/15/2022 B - Approved as noted Answered
CO S 11/16/2022 11/15/2022 B - Approved as noted Answered
CO S 11/17/2022 11/15/2022 B - Approved as noted Answered
CO S 11/15/2022 11/15/2022 B - Approved as noted Answered
CO S 11/15/2022 11/15/2022 B - Approved as noted Answered
CO S 11/16/2022 11/15/2022 B - Approved as noted Answered
CO S 11/16/2022 11/15/2022 B - Approved as noted Answered
NA S 11/16/2022 11/15/2022 B - Approved as noted Answered
EC SU 11/16/2022 11/15/2022 B - Approved as noted Answered
EC SU 11/16/2022 11/15/2022 B - Approved as noted Answered
NA SU 11/16/2022 11/15/2022 B - Approved as noted Answered
EC S 11/16/2022 11/15/2022 B - Approved as noted Answered
MC S 11/16/2022 11/15/2022 B - Approved as noted Answered
EC S 11/16/2022 11/15/2022 B - Approved as noted Answered
CO S 11/16/2022 11/15/2022 B - Approved as noted Answered
CO S 11/20/2022 11/15/2022 B - Approved as noted Answered
CO S 11/16/2022 11/15/2022 B - Approved as noted Answered
CO S 11/16/2022 11/15/2022 B - Approved as noted Answered
CO S 11/16/2022 11/15/2022 B - Approved as noted Answered
MC S 11/16/2022 11/15/2022 B - Approved as noted Answered
MC S 11/16/2022 11/15/2022 B - Approved as noted Answered
MC S 11/16/2022 11/15/2022 B - Approved as noted Answered
MC S 11/16/2022 11/15/2022 B - Approved as noted Answered
MC S 11/16/2022 11/15/2022 B - Approved as noted Answered
LM S 11/16/2022 11/15/2022 B - Approved as noted Answered
LM S 11/16/2022 11/15/2022 B - Approved as noted Answered
CO S 11/20/2022 11/15/2022 B - Approved as noted Answered
WG LS 11/16/2022 11/15/2022 B - Approved as noted Answered
PG S 11/16/2022 11/15/2022 B - Approved as noted Answered
PG C 11/16/2022 11/15/2022 B - Approved as noted Answered
PG C 11/16/2022 11/15/2022 B - Approved as noted Answered
WG C 11/16/2022 11/15/2022 B - Approved as noted Answered
WG C 11/16/2022 11/15/2022 B - Approved as noted Answered
TG C 11/16/2022 11/15/2022 B - Approved as noted Answered
TG C 11/16/2022 11/15/2022 B - Approved as noted Answered
TG C 11/16/2022 11/15/2022 B - Approved as noted Answered
TG C 11/16/2022 11/15/2022 B - Approved as noted Answered
SW LS 11/14/2022 11/13/2022 B - Approved as noted Answered
SW C 11/14/2022 11/13/2022 B - Approved as noted Answered
SW C 11/14/2022 11/13/2022 C - Revise & Resubmit Answered
SW C 11/14/2022 11/13/2022 B - Approved as noted Answered
SW C 11/19/2022 11/13/2022 B - Approved as noted Answered
SW C 11/14/2022 11/13/2022 B - Approved as noted Answered
SW C 11/14/2022 11/13/2022 B - Approved as noted Answered
SW C 11/14/2022 11/13/2022 B - Approved as noted Answered
SW C 11/14/2022 11/13/2022 B - Approved as noted Answered
SW C 11/14/2022 11/13/2022 B - Approved as noted Answered
SW C 11/14/2022 11/13/2022 B - Approved as noted Answered
SW C 11/14/2022 11/13/2022 B - Approved as noted Answered
SW C 11/14/2022 11/13/2022 B - Approved as noted Answered
SW C 11/14/2022 11/13/2022 B - Approved as noted Answered
SW C 11/14/2022 11/13/2022 B - Approved as noted Answered
SW C 11/14/2022 11/13/2022 B - Approved as noted Answered
SW C 11/14/2022 11/13/2022 B - Approved as noted Answered
SW C 11/14/2022 11/13/2022 B - Approved as noted Answered
SW C 11/14/2022 11/13/2022 B - Approved as noted Answered
SW C 11/14/2022 11/13/2022 B - Approved as noted Answered
SW C 11/14/2022 11/13/2022 B - Approved as noted Answered
WG LS 11/16/2022 11/15/2022 B - Approved as noted Answered
WG C 11/16/2022 11/15/2022 B - Approved as noted Answered
SW M 11/17/2022 11/16/2022 B - Approved as noted Answered
SW M 11/17/2022 11/16/2022 B - Approved as noted Answered
CC C 11/16/2022 11/15/2022 B - Approved as noted Answered
FC A 11/15/2022 11/14/2022 B - Approved as noted Answered
TT A 11/15/2022 11/14/2022 B - Approved as noted Answered
WG C 11/15/2022 11/14/2022 B - Approved as noted Answered
WG C 11/15/2022 11/14/2022 B - Approved as noted Answered
WG C 11/15/2022 11/14/2022 B - Approved as noted Answered
TB S 11/15/2022 11/14/2022 B - Approved as noted Answered
AG S 11/15/2022 11/14/2022 C - Revise & Resubmit Answered
WG LS 11/15/2022 11/14/2022 B - Approved as noted Answered
WG E 11/14/2022 11/13/2022 B - Approved as noted Answered
WG E 11/14/2022 11/13/2022 B - Approved as noted Answered
BO E 11/19/2022 11/14/2022 B - Approved as noted Answered
WG LC 11/14/2022 11/13/2022 B - Approved as noted Answered
WG LC 11/14/2022 11/13/2022 B - Approved as noted Answered
CO A 11/14/2022 11/13/2022 B - Approved as noted Answered
CO A 11/3/2022 11/2/2022 C - Revise & Resubmit Answered
SW LS 11/13/2022 11/12/2022 B - Approved as noted Answered
SW C 11/13/2022 11/12/2022 B - Approved as noted Answered
SW C 11/13/2022 11/12/2022 B - Approved as noted Answered
SW C 11/13/2022 11/12/2022 B - Approved as noted Answered
SW C 11/13/2022 11/12/2022 B - Approved as noted Answered
SW C 11/13/2022 11/12/2022 B - Approved as noted Answered
SW C 11/13/2022 11/12/2022 B - Approved as noted Answered
SW C 11/13/2022 11/12/2022 B - Approved as noted Answered
SW C 11/13/2022 11/12/2022 B - Approved as noted Answered
SW C 11/13/2022 11/12/2022 B - Approved as noted Answered
SW C 11/13/2022 11/12/2022 B - Approved as noted Answered
SW C 11/13/2022 11/12/2022 B - Approved as noted Answered
SW C 11/13/2022 11/12/2022 B - Approved as noted Answered
SW C 11/13/2022 11/12/2022 B - Approved as noted Answered
SW C 11/13/2022 11/12/2022 B - Approved as noted Answered
WG LS 11/15/2022 11/14/2022 B - Approved as noted Answered
PC P 11/15/2022 11/14/2022 B - Approved as noted Answered
PC P 11/15/2022 11/14/2022 B - Approved as noted Answered
LM A 11/15/2022 11/14/2022 B - Approved as noted Answered
LM A 11/15/2022 11/14/2022 C - Revise & Resubmit Answered
LM A 11/15/2022 11/14/2022 B - Approved as noted Answered
CC C 11/15/2022 11/14/2022 B - Approved as noted Answered
MC C 11/15/2022 11/14/2022 B - Approved as noted Answered
PC C 11/15/2022 11/14/2022 C - Revise & Resubmit Answered
SW C 11/15/2022 11/14/2022 C - Revise & Resubmit Answered
CO C 11/15/2022 11/14/2022 B - Approved as noted Answered
CO C 11/15/2022 11/14/2022 B - Approved as noted Answered
CO C 11/15/2022 11/14/2022 B - Approved as noted Answered
PC C 11/15/2022 11/14/2022 C - Revise & Resubmit Answered
CO C 11/15/2022 11/14/2022 B - Approved as noted Answered
SW C 11/15/2022 11/14/2022 B - Approved as noted Answered
MC C 11/15/2022 11/14/2022 B - Approved as noted Answered
MC C 11/15/2022 11/14/2022 B - Approved as noted Answered
CO C 11/8/2022 11/7/2022 B - Approved as noted Answered
CC S 11/15/2022 11/14/2022 B - Approved as noted Answered
CO S 11/15/2022 11/14/2022 B - Approved as noted Answered
CO S 11/15/2022 11/14/2022 B - Approved as noted Answered
CO S 11/15/2022 11/14/2022 B - Approved as noted Answered
CO S 11/15/2022 11/14/2022 B - Approved as noted Answered
CO S 11/15/2022 11/14/2022 B - Approved as noted Answered
CO S 11/15/2022 11/14/2022 B - Approved as noted Answered
CO S 11/15/2022 11/14/2022 B - Approved as noted Answered
CO S 11/15/2022 11/14/2022 B - Approved as noted Answered
CO S 11/15/2022 11/14/2022 B - Approved as noted Answered
CO SU 11/15/2022 11/14/2022 B - Approved as noted Answered
CO SU 11/15/2022 11/14/2022 B - Approved as noted Answered
CO SU 11/15/2022 11/15/2022 B - Approved as noted Answered
PG C 11/14/2022 11/13/2022 B - Approved as noted Answered
PG C 11/14/2022 11/13/2022 B - Approved as noted Answered
AG SU 11/14/2022 11/13/2022 B - Approved as noted Answered
AG A 11/15/2022 11/13/2022 B - Approved as noted Answered
AG A 11/14/2022 11/13/2022 B - Approved as noted Answered
AG A 11/14/2022 11/13/2022 B - Approved as noted Answered
TT A 11/14/2022 11/13/2022 B - Approved as noted Answered
FC A 11/14/2022 11/13/2022 B - Approved as noted Answered
WG S 11/14/2022 11/13/2022 B - Approved as noted Answered
WG S 11/14/2022 11/13/2022 B - Approved as noted Answered
WG S 11/14/2022 11/13/2022 B - Approved as noted Answered
WG S 11/14/2022 11/13/2022 B - Approved as noted Answered
TG S 11/14/2022 11/13/2022 B - Approved as noted Answered
LM E 11/13/2022 11/12/2022 B - Approved as noted Answered
SW E 11/17/2022 11/13/2022 B - Approved as noted Answered
SW E 11/14/2022 11/13/2022 B - Approved as noted Answered
SW E 11/13/2022 11/12/2022 B - Approved as noted Answered
MC C 11/14/2022 11/13/2022 B - Approved as noted Answered
CO C 11/14/2022 11/13/2022 B - Approved as noted Answered
MC C 11/14/2022 11/13/2022 B - Approved as noted Answered
EC C 11/14/2022 11/13/2022 B - Approved as noted Answered
EC C 11/14/2022 11/13/2022 B - Approved as noted Answered
PG C 11/13/2022 11/12/2022 B - Approved as noted Answered
CO S 11/14/2022 11/13/2022 B - Approved as noted Answered
PG C 11/13/2022 11/12/2022 B - Approved as noted Answered
CO S 11/14/2022 11/13/2022 B - Approved as noted Answered
CO S 11/14/2022 11/13/2022 B - Approved as noted Answered
TG SU 11/13/2022 11/12/2022 B - Approved as noted Answered
CO S 11/14/2022 11/13/2022 B - Approved as noted Answered
TG S 11/13/2022 11/12/2022 B - Approved as noted Answered
WG S 11/13/2022 11/12/2022 B - Approved as noted Answered
CO S 11/14/2022 11/13/2022 B - Approved as noted Answered
MC S 11/17/2022 11/13/2022 B - Approved as noted Answered
WG S 11/13/2022 11/12/2022 B - Approved as noted Answered
MC S 11/17/2022 11/13/2022 B - Approved as noted Answered
MC S 11/14/2022 11/13/2022 B - Approved as noted Answered
CO S 11/14/2022 11/13/2022 B - Approved as noted Answered
CO S 11/14/2022 11/13/2022 B - Approved as noted Answered
CO S 11/14/2022 11/13/2022 B - Approved as noted Answered
CO S 11/14/2022 11/13/2022 B - Approved as noted Answered
EC S 11/14/2022 11/13/2022 B - Approved as noted Answered
CO S 11/14/2022 11/13/2022 B - Approved as noted Answered
MC S 11/19/2022 11/13/2022 B - Approved as noted Answered
SW M 11/19/2022 11/13/2022 B - Approved as noted Answered
SW M 11/14/2022 11/13/2022 B - Approved as noted Answered
SW C 11/12/2022 11/10/2022 B - Approved as noted Answered
SW C 11/12/2022 11/10/2022 B - Approved as noted Answered
SW C 11/12/2022 11/10/2022 B - Approved as noted Answered
SW C 11/12/2022 11/10/2022 B - Approved as noted Answered
SW C 11/12/2022 11/10/2022 B - Approved as noted Answered
PG E 11/14/2022 11/13/2022 B - Approved as noted Answered
NA SU 11/14/2022 11/13/2022 B - Approved as noted Answered
MB E 11/10/2022 11/9/2022 C - Revise & Resubmit Answered
MC SU 11/14/2022 11/13/2022 B - Approved as noted Answered
MB E 11/10/2022 11/9/2022 C - Revise & Resubmit Answered
EC SU 11/14/2022 11/13/2022 B - Approved as noted Answered
MB LC 11/10/2022 11/9/2022 C - Revise & Resubmit Answered
MB LC 11/10/2022 11/9/2022 C - Revise & Resubmit Answered
MC SU 11/14/2022 11/13/2022 B - Approved as noted Answered
FC LC 11/13/2022 11/12/2022 B - Approved as noted Answered
DG E 11/16/2022 11/10/2022 C - Revise & Resubmit Answered
CO A 11/12/2022 11/10/2022 B - Approved as noted Answered
CO A 11/12/2022 11/10/2022 B - Approved as noted Answered
CO A 11/12/2022 11/10/2022 B - Approved as noted Answered
CO A 11/12/2022 11/10/2022 B - Approved as noted Answered
CO S 11/7/2022 11/6/2022 B - Approved as noted Answered
CO S 11/7/2022 11/6/2022 B - Approved as noted Answered
VG S 11/13/2022 11/12/2022 B - Approved as noted Answered
VG S 11/13/2022 11/12/2022 B - Approved as noted Answered
VG S 11/13/2022 11/12/2022 B - Approved as noted Answered
MC S 11/13/2022 11/12/2022 B - Approved as noted Answered
MC S 11/13/2022 11/12/2022 B - Approved as noted Answered
MC S 11/13/2022 11/12/2022 B - Approved as noted Answered
NA S 11/13/2022 11/12/2022 B - Approved as noted Answered
NA S 11/13/2022 11/12/2022 B - Approved as noted Answered
CO S 11/13/2022 11/12/2022 B - Approved as noted Answered
CO S 11/13/2022 11/12/2022 B - Approved as noted Answered
LM S 11/13/2022 11/12/2022 B - Approved as noted Answered
CO S 11/13/2022 11/12/2022 B - Approved as noted Answered
CO S 11/13/2022 11/12/2022 B - Approved as noted Answered
CO S 11/13/2022 11/12/2022 B - Approved as noted Answered
CO S 11/12/2022 11/10/2022 B - Approved as noted Answered
EC S 11/12/2022 11/10/2022 B - Approved as noted Answered
CO S 11/12/2022 11/10/2022 B - Approved as noted Answered
VG S 11/12/2022 11/10/2022 B - Approved as noted Answered
LM S 11/16/2022 11/12/2022 B - Approved as noted Answered
SW LS 11/15/2022 11/12/2022 B - Approved as noted Answered
SW LS 11/15/2022 11/12/2022 B - Approved as noted Answered
SW LS 11/13/2022 11/12/2022 B - Approved as noted Answered
WG LS 11/12/2022 11/10/2022 B - Approved as noted Answered
WG C 11/12/2022 11/10/2022 B - Approved as noted Answered
EC S 11/12/2022 11/10/2022 B - Approved as noted Answered
CO C 11/13/2022 11/12/2022 B - Approved as noted Answered
MC C 11/12/2022 11/10/2022 B - Approved as noted Answered
EC C 11/12/2022 11/10/2022 B - Approved as noted Answered
VG C 11/12/2022 11/10/2022 B - Approved as noted Answered
CO C 11/12/2022 11/10/2022 C - Revise & Resubmit Answered
JG C 11/14/2022 11/10/2022 B - Approved as noted Answered
EC C 11/12/2022 11/10/2022 B - Approved as noted Answered
MC C 11/10/2022 11/9/2022 B - Approved as noted Answered
LM P 11/12/2022 11/10/2022 B - Approved as noted Answered
SW C 11/13/2022 11/9/2022 B - Approved as noted Answered
SW C 11/10/2022 11/9/2022 B - Approved as noted Answered
SW C 11/10/2022 11/9/2022 B - Approved as noted Answered
SW C 11/10/2022 11/9/2022 B - Approved as noted Answered
SW C 11/10/2022 11/9/2022 B - Approved as noted Answered
SW C 11/10/2022 11/9/2022 B - Approved as noted Answered
SW C 11/13/2022 11/9/2022 B - Approved as noted Answered
EC S 11/12/2022 11/10/2022 B - Approved as noted Answered
EC S 11/12/2022 11/10/2022 B - Approved as noted Answered
EC S 11/12/2022 11/10/2022 B - Approved as noted Answered
EC S 11/12/2022 11/10/2022 B - Approved as noted Answered
CO S 11/12/2022 11/10/2022 B - Approved as noted Answered
MC S 11/10/2022 11/9/2022 B - Approved as noted Answered
MC S 11/10/2022 11/9/2022 B - Approved as noted Answered
EC S 11/10/2022 11/9/2022 B - Approved as noted Answered
EC S 11/10/2022 11/9/2022 B - Approved as noted Answered
CO S 11/12/2022 11/10/2022 B - Approved as noted Answered
CO S 11/12/2022 11/10/2022 B - Approved as noted Answered
LM S 11/10/2022 11/9/2022 B - Approved as noted Answered
CO S 11/10/2022 11/9/2022 B - Approved as noted Answered
CO S 11/10/2022 11/9/2022 B - Approved as noted Answered
CO S 11/10/2022 11/9/2022 B - Approved as noted Answered
LM S 11/10/2022 11/9/2022 B - Approved as noted Answered
CO S 11/10/2022 11/9/2022 B - Approved as noted Answered
CO S 11/10/2022 11/9/2022 B - Approved as noted Answered
CO S 11/10/2022 11/9/2022 B - Approved as noted Answered
EC S 11/12/2022 11/9/2022 B - Approved as noted Answered
CO A 11/13/2022 11/12/2022 B - Approved as noted Answered
SW C 11/13/2022 11/9/2022 B - Approved as noted Answered
CO A 10/24/2022 10/23/2022 B - Approved as noted Answered
SW C 11/10/2022 11/9/2022 B - Approved as noted Answered
LM SU 11/13/2022 11/12/2022 B - Approved as noted Answered
CO SU 11/16/2022 11/12/2022 B - Approved as noted Answered
MC SU 11/13/2022 11/12/2022 B - Approved as noted Answered
SW C 11/10/2022 11/9/2022 B - Approved as noted Answered
NA SU 11/16/2022 11/12/2022 B - Approved as noted Answered
CO SU 11/13/2022 11/12/2022 B - Approved as noted Answered
CO SU 11/13/2022 10/12/2022 B - Approved as noted Answered
SW C 11/10/2022 11/9/2022 B - Approved as noted Answered
SW C 11/10/2022 11/9/2022 B - Approved as noted Answered
SW C 11/10/2022 11/9/2022 B - Approved as noted Answered
CO SU 11/12/2022 11/10/2022 B - Approved as noted Answered
EC SU 11/12/2022 11/10/2022 B - Approved as noted Answered
SW C 11/10/2022 11/9/2022 B - Approved as noted Answered
SW C 11/10/2022 11/9/2022 B - Approved as noted Answered
SW C 11/10/2022 11/9/2022 B - Approved as noted Answered
SW C 11/10/2022 11/9/2022 B - Approved as noted Answered
SW C 11/9/2022 11/9/2022 B - Approved as noted Answered
SW C 11/10/2022 11/9/2022 B - Approved as noted Answered
SW C 11/13/2022 11/9/2022 B - Approved as noted Answered
WG S 11/12/2022 11/10/2022 B - Approved as noted Answered
TB S 11/12/2022 11/10/2022 B - Approved as noted Answered
WG S 11/12/2022 11/10/2022 B - Approved as noted Answered
WG S 11/12/2022 11/10/2022 B - Approved as noted Answered
WG S 11/12/2022 11/10/2022 B - Approved as noted Answered
WG C 11/12/2022 11/10/2022 B - Approved as noted Answered
WG C 11/12/2022 11/10/2022 B - Approved as noted Answered
SW C 11/12/2022 11/10/2022 B - Approved as noted Answered
SW C 11/12/2022 11/10/2022 B - Approved as noted Answered
SW C 11/12/2022 11/10/2022 B - Approved as noted Answered
SW C 11/12/2022 11/10/2022 B - Approved as noted Answered
SW C 11/12/2022 11/10/2022 B - Approved as noted Answered
SW C 11/12/2022 11/10/2022 B - Approved as noted Answered
SW C 11/12/2022 11/10/2022 B - Approved as noted Answered
SW C 11/12/2022 11/10/2022 B - Approved as noted Answered
SW C 11/12/2022 11/10/2022 B - Approved as noted Answered
SW C 11/12/2022 11/10/2022 B - Approved as noted Answered
SW C 11/12/2022 11/10/2022 B - Approved as noted Answered
SW C 11/12/2022 11/10/2022 B - Approved as noted Answered
SW C 11/12/2022 11/10/2022 B - Approved as noted Answered
SW C 11/12/2022 11/10/2022 B - Approved as noted Answered
EC SU 11/12/2022 11/10/2022 B - Approved as noted Answered
EC SU 11/12/2022 11/10/2022 B - Approved as noted Answered
CO SU 11/10/2022 11/9/2022 B - Approved as noted Answered
CO SU 11/12/2022 11/10/2022 B - Approved as noted Answered
LM SU 11/10/2022 11/9/2022 B - Approved as noted Answered
VG SU 11/12/2022 11/10/2022 B - Approved as noted Answered
CO SU 11/10/2022 11/9/2022 B - Approved as noted Answered
CO SU 11/9/2022 11/8/2022 B - Approved as noted Answered
EC SU 11/10/2022 11/9/2022 B - Approved as noted Answered
SW E 11/10/2022 11/9/2022 B - Approved as noted Answered
LM LC 11/13/2022 11/9/2022 B - Approved as noted Answered
LM S 11/7/2022 11/6/2022 B - Approved as noted Answered
EC S 11/7/2022 11/6/2022 B - Approved as noted Answered
LM S 11/7/2022 11/6/2022 B - Approved as noted Answered
LM S 11/7/2022 11/6/2022 B - Approved as noted Answered
LM S 11/7/2022 11/6/2022 B - Approved as noted Answered
EC S 11/7/2022 11/6/2022 B - Approved as noted Answered
EC S 11/7/2022 11/6/2022 B - Approved as noted Answered
EC S 11/7/2022 11/6/2022 B - Approved as noted Answered
EC S 11/7/2022 11/6/2022 B - Approved as noted Answered
CO S 11/7/2022 11/6/2022 B - Approved as noted Answered
TG LS 11/10/2022 11/9/2022 B - Approved as noted Answered
TG C 11/13/2022 11/9/2022 B - Approved as noted Answered
CO A 11/9/2022 11/8/2022 B - Approved as noted Answered
MB P 11/10/2022 11/9/2022 B - Approved as noted Answered
WG P 11/10/2022 11/9/2022 B - Approved as noted Answered
SW M 11/10/2022 11/9/2022 B - Approved as noted Answered
PC P 11/10/2022 11/9/2022 B - Approved as noted Answered
MB S 11/13/2022 11/9/2022 B - Approved as noted Answered
WG C 11/13/2022 11/9/2022 B - Approved as noted Answered
WG C 11/13/2022 11/9/2022 B - Approved as noted Answered
TG C 11/10/2022 11/9/2022 B - Approved as noted Answered
WG C 11/10/2022 11/9/2022 B - Approved as noted Answered
PG C 11/13/2022 11/9/2022 B - Approved as noted Answered
PG C 11/13/2022 11/9/2022 B - Approved as noted Answered
EC SU 11/7/2022 11/6/2022 B - Approved as noted Answered
NA SU 11/9/2022 11/8/2022 B - Approved as noted Answered
CF SU 11/8/2022 11/7/2022 B - Approved as noted Answered
CF SU 11/8/2022 11/7/2022 B - Approved as noted Answered
CF SU 11/8/2022 11/7/2022 B - Approved as noted Answered
EC C 11/9/2022 11/8/2022 B - Approved as noted Answered
CO C 11/9/2022 11/8/2022 B - Approved as noted Answered
EC C 11/9/2022 11/8/2022 B - Approved as noted Answered
MC C 11/9/2022 11/8/2022 B - Approved as noted Answered
CO C 11/12/2022 11/7/2022 C - Revise & Resubmit Answered
EC S 11/10/2022 11/9/2022 B - Approved as noted Answered
LM E 11/6/2022 11/5/2022 B - Approved as noted Answered
SW C 11/9/2022 11/8/2022 B - Approved as noted Answered
SW C 11/9/2022 11/8/2022 B - Approved as noted Answered
SW C 11/9/2022 11/8/2022 B - Approved as noted Answered
SW C 11/9/2022 11/8/2022 B - Approved as noted Answered
SW C 11/9/2022 11/8/2022 B - Approved as noted Answered
SW C 11/9/2022 11/8/2022 B - Approved as noted Answered
SW C 11/9/2022 11/8/2022 B - Approved as noted Answered
SW C 11/9/2022 11/8/2022 B - Approved as noted Answered
SW C 11/9/2022 11/8/2022 B - Approved as noted Answered
SW C 11/9/2022 11/8/2022 B - Approved as noted Answered
SW C 11/9/2022 11/8/2022 B - Approved as noted Answered
SW C 11/9/2022 11/8/2022 B - Approved as noted Answered
SW C 11/9/2022 11/8/2022 B - Approved as noted Answered
CO S 11/7/2022 11/6/2022 B - Approved as noted Answered
CO S 11/7/2022 11/6/2022 B - Approved as noted Answered
CO C 11/7/2022 11/6/2022 B - Approved as noted Answered
CO C 11/7/2022 11/6/2022 B - Approved as noted Answered
WG C 11/9/2022 11/8/2022 B - Approved as noted Answered
VG C 11/7/2022 11/6/2022 C - Revise & Resubmit Answered
AG C 11/9/2022 11/8/2022 B - Approved as noted Answered
WG C 11/9/2022 11/8/2022 B - Approved as noted Answered
WG C 11/9/2022 11/8/2022 B - Approved as noted Answered
WG C 11/9/2022 11/8/2022 B - Approved as noted Answered
LM SU 11/7/2022 11/6/2022 B - Approved as noted Answered
CO SU 11/7/2022 11/6/2022 B - Approved as noted Answered
LM SU 11/7/2022 11/6/2022 B - Approved as noted Answered
EC SU 11/7/2022 11/6/2022 B - Approved as noted Answered
EC SU 11/7/2022 11/6/2022 B - Approved as noted Answered
CO SU 11/7/2022 11/6/2022 B - Approved as noted Answered
CO S 11/6/2022 11/5/2022 B - Approved as noted Answered
SM S 11/6/2022 11/5/2022 B - Approved as noted Answered
NA S 11/6/2022 11/5/2022 B - Approved as noted Answered
CO S 11/6/2022 11/5/2022 B - Approved as noted Answered
CO S 11/6/2022 11/5/2022 B - Approved as noted Answered
CF S 11/6/2022 11/5/2022 B - Approved as noted Answered
CO A 11/6/2022 11/5/2022 B - Approved as noted Answered
CO A 11/6/2022 11/5/2022 B - Approved as noted Answered
EC C 11/6/2022 11/5/2022 B - Approved as noted Answered
CO C 11/6/2022 11/5/2022 B - Approved as noted Answered
PG C 11/8/2022 11/7/2022 B - Approved as noted Answered
CO C 11/6/2022 11/5/2022 B - Approved as noted Answered
MC SU 11/6/2022 11/5/2022 B - Approved as noted Answered
CO SU 11/6/2022 11/5/2022 B - Approved as noted Answered
MC S 11/5/2022 11/3/2022 B - Approved as noted Answered
MC SU 11/5/2022 11/3/2022 B - Approved as noted Answered
CO SU 11/5/2022 11/3/2022 B - Approved as noted Answered
CO SU 11/5/2022 11/3/2022 B - Approved as noted Answered
CO S 11/5/2022 11/3/2022 B - Approved as noted Answered
CO S 11/5/2022 11/3/2022 C - Revise & Resubmit Answered
CC C 11/9/2022 11/8/2022 C - Revise & Resubmit Answered
EC S 11/5/2022 11/3/2022 B - Approved as noted Answered
LM S 11/5/2022 11/3/2022 B - Approved as noted Answered
CO S 11/5/2022 11/3/2022 B - Approved as noted Answered
NA P 11/9/2022 11/8/2022 B - Approved as noted Answered
CO S 11/5/2022 11/3/2022 B - Approved as noted Answered
CO S 11/7/2022 11/6/2022 B - Approved as noted Answered
CO S 11/5/2022 11/3/2022 B - Approved as noted Answered
LM P 11/9/2022 11/8/2022 B - Approved as noted Answered
MC S 11/5/2022 11/3/2022 B - Approved as noted Answered
MC S 11/5/2022 11/3/2022 B - Approved as noted Answered
CO S 11/5/2022 11/3/2022 B - Approved as noted Answered
CO S 11/5/2022 11/3/2022 B - Approved as noted Answered
SW M 11/9/2022 11/8/2022 B - Approved as noted Answered
CO S 11/5/2022 11/3/2022 C - Revise & Resubmit Answered
VG S 11/5/2022 11/3/2022 B - Approved as noted Answered
CO S 11/5/2022 11/3/2022 B - Approved as noted Answered
EC S 11/5/2022 11/3/2022 B - Approved as noted Answered
EC S 11/5/2022 11/3/2022 B - Approved as noted Answered
CO S 11/5/2022 11/3/2022 B - Approved as noted Answered
SM S 11/5/2022 11/3/2022 B - Approved as noted Answered
CO C 10/18/2022 10/16/2022 B - Approved as noted Answered
SW E 11/8/2022 11/7/2022 B - Approved as noted Answered
SW E 11/8/2022 11/7/2022 C - Revise & Resubmit Answered
SW LS 11/7/2022 11/6/2022 B - Approved as noted Answered
SW LS 11/7/2022 11/6/2022 B - Approved as noted Answered
SW LS 11/7/2022 11/6/2022 B - Approved as noted Answered
SW C 11/7/2022 11/6/2022 B - Approved as noted Answered
SW C 11/7/2022 11/6/2022 B - Approved as noted Answered
SW C 11/7/2022 11/6/2022 B - Approved as noted Answered
SW C 11/9/2022 11/6/2022 B - Approved as noted Answered
SW C 11/7/2022 11/6/2022 B - Approved as noted Answered
SW C 11/7/2022 11/6/2022 B - Approved as noted Answered
SW C 11/7/2022 11/6/2022 B - Approved as noted Answered
SW C 11/7/2022 11/6/2022 B - Approved as noted Answered
SW C 11/7/2022 11/6/2022 B - Approved as noted Answered
CF SU 11/8/2022 11/7/2022 B - Approved as noted Answered
SW C 11/7/2022 11/6/2022 B - Approved as noted Answered
VG SU 11/8/2022 11/7/2022 B - Approved as noted Answered
CO SU 11/5/2022 11/3/2022 B - Approved as noted Answered
SW C 11/7/2022 11/6/2022 B - Approved as noted Answered
SW C 11/7/2022 11/6/2022 B - Approved as noted Answered
CO SU 11/5/2022 11/3/2022 B - Approved as noted Answered
EC SU 11/5/2022 11/3/2022 B - Approved as noted Answered
SM SU 11/5/2022 11/3/2022 B - Approved as noted Answered
CO A 11/8/2022 11/7/2022 B - Approved as noted Answered
CF S 11/3/2022 11/2/2022 B - Approved as noted Answered
CF S 11/3/2022 11/2/2022 B - Approved as noted Answered
SM A 11/3/2022 11/2/2022 B - Approved as noted Answered
CO S 11/3/2022 11/2/2022 B - Approved as noted Answered
CO S 11/3/2022 11/2/2022 C - Revise & Resubmit Answered
MC S 11/3/2022 11/2/2022 B - Approved as noted Answered
CO S 11/3/2022 11/2/2022 B - Approved as noted Answered
PG S 11/8/2022 11/7/2022 B - Approved as noted Answered
NA S 11/3/2022 11/2/2022 B - Approved as noted Answered
NA S 11/3/2022 11/2/2022 B - Approved as noted Answered
PG LS 11/16/2022 11/7/2022 C - Revise & Resubmit Answered
PG C 11/8/2022 11/7/2022 B - Approved as noted Answered
SM S 11/3/2022 11/2/2022 C - Revise & Resubmit Answered
PG C 11/8/2022 11/7/2022 B - Approved as noted Answered
SM S 11/3/2022 11/2/2022 B - Approved as noted Answered
CO SU 11/3/2022 11/2/2022 B - Approved as noted Answered
PG C 11/8/2022 11/7/2022 B - Approved as noted Answered
CO S 11/9/2022 11/8/2022 B - Approved as noted Answered
WG C 11/8/2022 11/7/2022 B - Approved as noted Answered
PC S 11/9/2022 11/8/2022 B - Approved as noted Answered
WG C 11/8/2022 11/7/2022 B - Approved as noted Answered
PC S 11/9/2022 11/8/2022 B - Approved as noted Answered
NA SU 11/7/2022 11/2/2022 C - Revise & Resubmit Answered
WG C 11/8/2022 11/7/2022 B - Approved as noted Answered
SM SU 11/3/2022 11/2/2022 C - Revise & Resubmit Answered
WG C 11/8/2022 11/7/2022 B - Approved as noted Answered
CO C 11/3/2022 11/2/2022 B - Approved as noted Answered
CO C 11/3/2022 11/2/2022 B - Approved as noted Answered
CO C 11/3/2022 11/2/2022 B - Approved as noted Answered
CO S 11/9/2022 11/8/2022 B - Approved as noted Answered
CO S 11/9/2022 11/8/2022 B - Approved as noted Answered
CO S 11/9/2022 11/8/2022 B - Approved as noted Answered
CO S 11/9/2022 11/8/2022 B - Approved as noted Answered
CO S 11/9/2022 11/8/2022 B - Approved as noted Answered
CO S 11/9/2022 11/8/2022 B - Approved as noted Answered
VG S 11/9/2022 11/8/2022 B - Approved as noted Answered
CO S 10/15/2022 10/13/2022 B - Approved as noted Answered
EC S 11/9/2022 11/8/2022 B - Approved as noted Answered
CF S 11/9/2022 11/8/2022 B - Approved as noted Answered
CF S 11/9/2022 11/8/2022 B - Approved as noted Answered
NA S 11/9/2022 11/8/2022 B - Approved as noted Answered
CO S 11/9/2022 11/8/2022 B - Approved as noted Answered
VG S 11/9/2022 11/8/2022 B - Approved as noted Answered
CO S 11/9/2022 11/8/2022 B - Approved as noted Answered
CO S 11/9/2022 11/8/2022 B - Approved as noted Answered
CO S 11/9/2022 11/8/2022 B - Approved as noted Answered
CF S 11/8/2022 11/7/2022 B - Approved as noted Answered
CF S 11/8/2022 11/7/2022 B - Approved as noted Answered
CF S 11/8/2022 11/7/2022 B - Approved as noted Answered
CF S 11/8/2022 11/7/2022 B - Approved as noted Answered
CF S 11/8/2022 11/7/2022 B - Approved as noted Answered
CF S 11/8/2022 11/7/2022 B - Approved as noted Answered
VG S 11/8/2022 11/7/2022 B - Approved as noted Answered
VG S 11/8/2022 11/7/2022 B - Approved as noted Answered
VG S 11/8/2022 11/7/2022 B - Approved as noted Answered
VG S 11/8/2022 11/7/2022 B - Approved as noted Answered
CO S 11/9/2022 11/8/2022 B - Approved as noted Answered
VG S 9/14/2022 9/13/2022 B - Approved as noted Answered
VG S 8/24/2022 8/23/2022 C - Revise & Resubmit Answered
LM LC 11/8/2022 11/8/2022 B - Approved as noted Answered
SW C 11/8/2022 11/7/2022 B - Approved as noted Answered
SW C 11/8/2022 11/7/2022 C - Revise & Resubmit Answered
SW C 11/8/2022 11/7/2022 B - Approved as noted Answered
SW C 11/8/2022 11/7/2022 B - Approved as noted Answered
SW C 11/8/2022 11/7/2022 B - Approved as noted Answered
SW C 11/8/2022 11/7/2022 B - Approved as noted Answered
SW C 11/13/2022 11/7/2022 B - Approved as noted Answered
SW C 11/8/2022 11/7/2022 B - Approved as noted Answered
SW C 11/8/2022 11/7/2022 B - Approved as noted Answered
SW C 11/8/2022 11/7/2022 B - Approved as noted Answered
SW C 11/8/2022 11/7/2022 B - Approved as noted Answered
SW C 11/8/2022 11/7/2022 B - Approved as noted Answered
SW C 11/8/2022 11/7/2022 B - Approved as noted Answered
SW C 11/8/2022 11/7/2022 B - Approved as noted Answered
SW C 11/8/2022 11/7/2022 B - Approved as noted Answered
SW C 11/8/2022 11/7/2022 B - Approved as noted Answered
SW C 11/6/2022 11/5/2022 B - Approved as noted Answered
SW C 11/6/2022 11/5/2022 B - Approved as noted Answered
SW C 11/6/2022 11/5/2022 B - Approved as noted Answered
SW C 11/6/2022 11/5/2022 B - Approved as noted Answered
SW C 11/6/2022 11/5/2022 B - Approved as noted Answered
SW C 11/6/2022 11/5/2022 B - Approved as noted Answered
SW C 11/6/2022 11/5/2022 B - Approved as noted Answered
MC S 11/8/2022 11/7/2022 B - Approved as noted Answered
CO S 11/8/2022 11/7/2022 B - Approved as noted Answered
VG S 11/8/2022 11/7/2022 B - Approved as noted Answered
CO S 11/8/2022 11/7/2022 C - Revise & Resubmit Answered
NA S 11/8/2022 11/7/2022 C - Revise & Resubmit Answered
CO S 11/8/2022 11/7/2022 B - Approved as noted Answered
SW LS 11/5/2022 11/3/2022 B - Approved as noted Answered
SW C 11/5/2022 11/3/2022 B - Approved as noted Answered
SW C 11/5/2022 11/3/2022 B - Approved as noted Answered
SW C 11/5/2022 11/3/2022 B - Approved as noted Answered
SW C 11/5/2022 11/3/2022 B - Approved as noted Answered
SW C 11/5/2022 11/3/2022 B - Approved as noted Answered
SW C 11/5/2022 11/3/2022 B - Approved as noted Answered
SW C 11/5/2022 11/3/2022 B - Approved as noted Answered
SW C 11/7/2022 11/6/2022 B - Approved as noted Answered
SW C 11/5/2022 11/3/2022 B - Approved as noted Answered
SW C 11/5/2022 11/3/2022 B - Approved as noted Answered
SW C 11/5/2022 11/3/2022 B - Approved as noted Answered
SW C 11/5/2022 11/3/2022 B - Approved as noted Answered
SW C 11/3/2022 11/2/2022 B - Approved as noted Answered
SW C 11/3/2022 11/2/2022 B - Approved as noted Answered
SW C 11/3/2022 11/2/2022 C - Revise & Resubmit Answered
SW C 11/3/2022 11/2/2022 C - Revise & Resubmit Answered
SW C 11/3/2022 11/2/2022 B - Approved as noted Answered
SW C 11/3/2022 11/2/2022 B - Approved as noted Answered
SW C 11/3/2022 11/2/2022 B - Approved as noted Answered
SW C 11/3/2022 11/2/2022 B - Approved as noted Answered
PC P 11/8/2022 11/7/2022 B - Approved as noted Answered
PG SU 11/7/2022 11/6/2022 B - Approved as noted Answered
PG S 11/7/2022 11/6/2022 B - Approved as noted Answered
WG S 11/7/2022 11/6/2022 B - Approved as noted Answered
TG LS 11/7/2022 11/6/2022 B - Approved as noted Answered
TG LS 11/7/2022 11/6/2022 B - Approved as noted Answered
AG C 11/7/2022 11/6/2022 B - Approved as noted Answered
PG C 11/7/2022 11/6/2022 B - Approved as noted Answered
WG C 11/7/2022 11/6/2022 B - Approved as noted Answered
WG C 11/7/2022 11/6/2022 B - Approved as noted Answered
WG C 11/7/2022 11/6/2022 B - Approved as noted Answered
CO A 11/8/2022 11/7/2022 B - Approved as noted Answered
CO A 11/8/2022 11/7/2022 B - Approved as noted Answered
CO A 11/8/2022 11/7/2022 B - Approved as noted Answered
CO C 10/24/2022 10/23/2022 B - Approved as noted Answered
WG C 11/7/2022 11/6/2022 B - Approved as noted Answered
CO A 11/8/2022 11/7/2022 B - Approved as noted Answered
CO A 11/8/2022 11/7/2022 B - Approved as noted Answered
WG C 11/7/2022 11/6/2022 B - Approved as noted Answered
WG C 11/7/2022 11/6/2022 B - Approved as noted Answered
CO A 11/8/2022 11/7/2022 B - Approved as noted Answered
WG C 11/7/2022 11/6/2022 B - Approved as noted Answered
SW A 11/7/2022 11/6/2022 C - Revise & Resubmit Answered
VG SU 10/6/2022 11/5/2022 B - Approved as noted Answered
VG SU 10/6/2022 10/5/2022 B - Approved as noted Answered
CF E 11/7/2022 11/6/2022 B - Approved as noted Answered
CC SU 10/18/2022 10/17/2022 B - Approved as noted Answered
CO C 9/19/2022 9/19/2022 B - Approved as noted Answered
CO A 11/3/2022 11/2/2022 C - Revise & Resubmit Answered
CO A 11/3/2022 11/2/2022 B - Approved as noted Answered
CO A 11/3/2022 11/2/2022 B - Approved as noted Answered
SW LS 11/8/2022 11/1/2022 B - Approved as noted Answered
SW C 11/2/2022 11/1/2022 B - Approved as noted Answered
SW C 11/2/2022 11/1/2022 B - Approved as noted Answered
SW C 11/2/2022 11/1/2022 B - Approved as noted Answered
SW C 11/2/2022 11/1/2022 B - Approved as noted Answered
SW C 11/2/2022 11/1/2022 B - Approved as noted Answered
SW C 11/2/2022 11/1/2022 B - Approved as noted Answered
SW C 11/2/2022 11/1/2022 B - Approved as noted Answered
SW C 11/2/2022 11/1/2022 B - Approved as noted Answered
SW C 11/2/2022 11/1/2022 B - Approved as noted Answered
SW C 11/2/2022 11/1/2022 B - Approved as noted Answered
SW C 11/2/2022 11/1/2022 B - Approved as noted Answered
SW C 11/2/2022 11/1/2022 B - Approved as noted Answered
SW C 11/2/2022 11/1/2022 B - Approved as noted Answered
SW C 11/5/2022 11/1/2022 B - Approved as noted Answered
WG LS 11/6/2022 11/6/2022 B - Approved as noted Answered
WG C 11/7/2022 11/6/2022 B - Approved as noted Answered
WG LS 11/7/2022 11/6/2022 A - Approved Answered
SW E 11/5/2022 11/3/2022 B - Approved as noted Answered
SW E 11/5/2022 11/3/2022 B - Approved as noted Answered
TT C 10/18/2022 10/17/2022 C - Revise & Resubmit Answered
WG C 11/6/2022 11/5/2022 B - Approved as noted Answered
WG C 11/6/2022 11/5/2022 B - Approved as noted Answered
WG C 11/3/2022 11/2/2022 B - Approved as noted Answered
SW C 10/27/2022 10/26/2022 B - Approved as noted Answered
CO S 11/2/2022 11/1/2022 B - Approved as noted Answered
CO S 11/2/2022 11/1/2022 C - Revise & Resubmit Answered
CO S 11/2/2022 11/1/2022 B - Approved as noted Answered
CC M 11/6/2022 11/5/2022 B - Approved as noted Answered
CO SU 11/2/2022 11/1/2022 B - Approved as noted Answered
SW M 11/5/2022 11/3/2022 B - Approved as noted Answered
SW C 11/7/2022 11/3/2022 B - Approved as noted Answered
SW C 11/5/2022 11/3/2022 B - Approved as noted Answered
FC A 11/6/2022 11/5/2022 B - Approved as noted Answered
PG C 11/6/2022 11/5/2022 B - Approved as noted Answered
AG S 11/6/2022 11/5/2022 B - Approved as noted Answered
PG SU 11/6/2022 11/5/2022 B - Approved as noted Answered
AG SU 11/6/2022 11/5/2022 B - Approved as noted Answered
PG C 11/5/2022 11/3/2022 B - Approved as noted Answered
PG C 11/5/2022 11/3/2022 B - Approved as noted Answered
PG C 11/5/2022 11/3/2022 B - Approved as noted Answered
PG C 11/5/2022 11/3/2022 B - Approved as noted Answered
MC S 10/30/2022 10/29/2022 B - Approved as noted Answered
WG C 11/5/2022 11/3/2022 B - Approved as noted Answered
WG C 11/7/2022 11/3/2022 B - Approved as noted Answered
MB C 11/5/2022 11/3/2022 B - Approved as noted Answered
PG C 11/5/2022 11/3/2022 B - Approved as noted Answered
WG LS 11/5/2022 11/3/2022 B - Approved as noted Answered
SW C 9/4/2022 8/31/2022 B - Approved as noted Answered
CO A 11/2/2022 11/1/2022 B - Approved as noted Answered
CO A 11/2/2022 11/1/2022 B - Approved as noted Answered
CO S 11/2/2022 11/1/2022 B - Approved as noted Answered
CO S 11/2/2022 11/1/2022 B - Approved as noted Answered
CO S 11/2/2022 11/1/2022 B - Approved as noted Answered
WG C 11/5/2022 11/3/2022 B - Approved as noted Answered
WG C 11/5/2022 11/3/2022 B - Approved as noted Answered
WG LS 11/5/2022 11/3/2022 B - Approved as noted Answered
WG LS 11/5/2022 11/3/2022 B - Approved as noted Answered
TT A 11/3/2022 11/2/2022 B - Approved as noted Answered
AG A 11/3/2022 11/2/2022 B - Approved as noted Answered
AG A 11/3/2022 11/2/2022 B - Approved as noted Answered
AG S 11/8/2022 11/2/2022 B - Approved as noted Answered
MB S 11/3/2022 11/2/2022 B - Approved as noted Answered
WG C 11/3/2022 11/2/2022 B - Approved as noted Answered
SW E 11/2/2022 11/1/2022 B - Approved as noted Answered
CO SU 11/2/2022 11/1/2022 B - Approved as noted Answered
VG P 11/3/2022 11/2/2022 B - Approved as noted Answered
CF SU 11/2/2022 11/1/2022 B - Approved as noted Answered
CO SU 11/2/2022 11/1/2022 B - Approved as noted Answered
SW M 11/3/2022 11/2/2022 B - Approved as noted Answered
EC S 11/2/2022 11/1/2022 B - Approved as noted Answered
EC S 11/2/2022 11/1/2022 B - Approved as noted Answered
EC S 11/2/2022 11/1/2022 B - Approved as noted Answered
VG C 11/2/2022 11/1/2022 B - Approved as noted Answered
SW LS 11/3/2022 11/2/2022 B - Approved as noted Answered
PC LS 11/3/2022 11/2/2022 B - Approved as noted Answered
CO C 11/2/2022 11/1/2022 B - Approved as noted Answered
CO C 11/2/2022 11/1/2022 B - Approved as noted Answered
CO C 11/2/2022 11/1/2022 B - Approved as noted Answered
CO C 11/2/2022 11/1/2022 B - Approved as noted Answered
CO C 11/2/2022 11/1/2022 B - Approved as noted Answered
CO S 11/2/2022 11/1/2022 B - Approved as noted Answered
CO S 11/2/2022 11/1/2022 B - Approved as noted Answered
CC S 11/2/2022 11/1/2022 B - Approved as noted Answered
SW C 11/1/2022 10/31/2022 B - Approved as noted Answered
SW C 11/1/2022 10/31/2022 B - Approved as noted Answered
CO A 11/1/2022 10/31/2022 B - Approved as noted Answered
SW C 11/1/2022 10/31/2022 B - Approved as noted Answered
CO SU 11/1/2022 10/31/2022 B - Approved as noted Answered
EC SU 11/1/2022 10/31/2022 B - Approved as noted Answered
SW C 11/1/2022 10/31/2022 B - Approved as noted Answered
CO SU 11/1/2022 10/31/2022 B - Approved as noted Answered
SW C 11/5/2022 10/31/2022 B - Approved as noted Answered
VG SU 11/1/2022 10/31/2022 B - Approved as noted Answered
SW C 11/5/2022 10/31/2022 B - Approved as noted Answered
SW C 11/1/2022 10/31/2022 B - Approved as noted Answered
CO SU 11/1/2022 10/31/2022 B - Approved as noted Answered
SW C 11/5/2022 10/31/2022 B - Approved as noted Answered
NA SU 11/1/2022 10/31/2022 B - Approved as noted Answered
SW C 11/5/2022 10/31/2022 B - Approved as noted Answered
SW C 11/1/2022 10/31/2022 B - Approved as noted Answered
SW C 11/1/2022 10/31/2022 B - Approved as noted Answered
EC C 11/1/2022 10/31/2022 B - Approved as noted Answered
SW C 11/1/2022 10/31/2022 B - Approved as noted Answered
VG C 11/5/2022 10/31/2022 B - Approved as noted Answered
SW C 11/5/2022 10/31/2022 B - Approved as noted Answered
CO C 11/1/2022 10/31/2022 B - Approved as noted Answered
SW C 11/1/2022 10/31/2022 B - Approved as noted Answered
AG A 11/2/2022 11/1/2022 B - Approved as noted Answered
TB S 11/2/2022 11/1/2022 B - Approved as noted Answered
TB SU 11/2/2022 11/1/2022 B - Approved as noted Answered
PG C 11/2/2022 11/1/2022 B - Approved as noted Answered
WG C 11/2/2022 11/1/2022 B - Approved as noted Answered
MB C 11/2/2022 11/1/2022 B - Approved as noted Answered
PG C 11/2/2022 11/1/2022 B - Approved as noted Answered
PG C 11/2/2022 11/1/2022 B - Approved as noted Answered
WG C 11/2/2022 11/1/2022 B - Approved as noted Answered
CO SU 10/31/2022 10/30/2022 B - Approved as noted Answered
WG C 11/2/2022 11/1/2022 B - Approved as noted Answered
SW C 11/2/2022 11/1/2022 B - Approved as noted Answered
WG C 11/2/2022 11/1/2022 B - Approved as noted Answered
EC S 11/13/2022 11/12/2022 B - Approved as noted Answered
SW LS 10/4/2022 9/28/2022 B - Approved as noted Answered
WG LS 9/29/2022 9/26/2022 B - Approved as noted Answered
SW C 10/31/2022 10/30/2022 B - Approved as noted Answered
SW C 10/31/2022 10/30/2022 B - Approved as noted Answered
SW C 10/31/2022 10/30/2022 B - Approved as noted Answered
SW C 10/31/2022 10/30/2022 B - Approved as noted Answered
SW C 10/31/2022 10/30/2022 B - Approved as noted Answered
SW M 11/2/2022 11/1/2022 B - Approved as noted Answered
SW M 11/2/2022 11/1/2022 B - Approved as noted Answered
SW M 11/2/2022 11/1/2022 B - Approved as noted Answered
SW M 11/2/2022 11/1/2022 B - Approved as noted Answered
SW M 11/2/2022 11/1/2022 B - Approved as noted Answered
CO S 11/1/2022 10/31/2022 B - Approved as noted Answered
CO S 11/5/2022 10/31/2022 B - Approved as noted Answered
CO S 11/5/2022 10/31/2022 B - Approved as noted Answered
VG S 11/1/2022 10/31/2022 B - Approved as noted Answered
VG S 11/1/2022 10/31/2022 B - Approved as noted Answered
EC S 11/1/2022 10/31/2022 B - Approved as noted Answered
WG LC 11/1/2022 10/31/2022 B - Approved as noted Answered
WG LC 11/1/2022 10/31/2022 B - Approved as noted Answered
WG E 11/1/2022 10/31/2022 B - Approved as noted Answered
EC S 11/1/2022 10/31/2022 B - Approved as noted Answered
EC S 11/1/2022 10/31/2022 B - Approved as noted Answered
CO S 11/1/2022 10/31/2022 B - Approved as noted Answered
CO S 11/1/2022 10/31/2022 B - Approved as noted Answered
CO S 11/1/2022 10/31/2022 B - Approved as noted Answered
CO S 11/1/2022 10/31/2022 B - Approved as noted Answered
VG S 11/1/2022 10/31/2022 B - Approved as noted Answered
CO S 11/1/2022 10/31/2022 B - Approved as noted Answered
MC S 11/1/2022 10/31/2022 B - Approved as noted Answered
NA S 11/1/2022 10/31/2022 B - Approved as noted Answered
SW C 10/31/2022 10/30/2022 B - Approved as noted Answered
SW C 10/31/2022 10/30/2022 B - Approved as noted Answered
SW C 11/1/2022 10/30/2022 B - Approved as noted Answered
SW C 10/31/2022 10/30/2022 B - Approved as noted Answered
SW C 10/31/2022 10/30/2022 B - Approved as noted Answered
SW C 10/31/2022 10/30/2022 B - Approved as noted Answered
NA S 11/1/2022 10/31/2022 B - Approved as noted Answered
SW C 10/31/2022 10/30/2022 C - Revise & Resubmit Answered
CO S 11/1/2022 10/31/2022 B - Approved as noted Answered
CO S 11/1/2022 10/31/2022 B - Approved as noted Answered
CO S 11/1/2022 10/31/2022 B - Approved as noted Answered
CO S 11/1/2022 10/31/2022 B - Approved as noted Answered
CO S 11/1/2022 10/31/2022 B - Approved as noted Answered
PC E 11/1/2022 10/31/2022 B - Approved as noted Answered
SM E 11/1/2022 10/31/2022 B - Approved as noted Answered
SM E 11/1/2022 10/31/2022 B - Approved as noted Answered
CF LC 11/1/2022 10/31/2022 B - Approved as noted Answered
SM LC 11/1/2022 10/31/2022 B - Approved as noted Answered
MB S 11/1/2022 10/31/2022 B - Approved as noted Answered
TG S 11/1/2022 10/31/2022 B - Approved as noted Answered
TG SU 11/1/2022 10/31/2022 B - Approved as noted Answered
PT A 11/1/2022 10/31/2022 B - Approved as noted Answered
AG A 11/1/2022 10/31/2022 B - Approved as noted Answered
WG C 11/1/2022 10/31/2022 B - Approved as noted Answered
WG C 11/1/2022 10/31/2022 B - Approved as noted Answered
SW C 11/1/2022 10/31/2022 B - Approved as noted Answered
PG C 11/5/2022 10/31/2022 B - Approved as noted Answered
CO S 10/30/2022 10/29/2022 B - Approved as noted Answered
CO S 11/30/2022 10/29/2022 B - Approved as noted Answered
MB E 10/30/2022 10/29/2022 C - Revise & Resubmit Answered
MB E 10/30/2022 10/29/2022 C - Revise & Resubmit Answered
TG P 11/1/2022 10/31/2022 B - Approved as noted Answered
LM P 11/1/2022 10/31/2022 B - Approved as noted Answered
PC P 11/1/2022 10/31/2022 C - Revise & Resubmit Answered
PC P 11/1/2022 10/31/2022 B - Approved as noted Answered
WG C 11/6/2022 10/31/2022 B - Approved as noted Answered
WG LS 11/1/2022 10/31/2022 B - Approved as noted Answered
SW E 10/31/2022 10/30/2022 B - Approved as noted Answered
LM LC 10/31/2022 10/30/2022 B - Approved as noted Answered
PC LC 10/31/2022 10/30/2022 B - Approved as noted Answered
PC LC 10/31/2022 10/30/2022 B - Approved as noted Answered
PC LC 10/31/2022 10/30/2022 B - Approved as noted Answered
SW C 10/31/2022 10/30/2022 B - Approved as noted Answered
SW C 11/5/2022 10/30/2022 B - Approved as noted Answered
SW C 10/31/2022 10/30/2022 B - Approved as noted Answered
SW LS 10/31/2022 10/30/2022 B - Approved as noted Answered
PG SU 10/31/2022 10/30/2022 B - Approved as noted Answered
TT A 10/31/2022 10/30/2022 B - Approved as noted Answered
AG A 10/31/2022 10/30/2022 B - Approved as noted Answered
PG S 11/3/2022 10/30/2022 B - Approved as noted Answered
PG S 10/31/2022 10/30/2022 B - Approved as noted Answered
TB S 10/31/2022 10/30/2022 B - Approved as noted Answered
TG LS 10/31/2022 10/30/2022 B - Approved as noted Answered
WG LS 10/31/2022 10/30/2022 B - Approved as noted Answered
WG LS 10/31/2022 10/30/2022 B - Approved as noted Answered
WG LS 10/31/2022 10/30/2022 B - Approved as noted Answered
WG C 10/31/2022 10/30/2022 B - Approved as noted Answered
WG C 10/31/2022 10/30/2022 B - Approved as noted Answered
WG C 10/31/2022 10/30/2022 B - Approved as noted Answered
WG C 10/31/2022 10/30/2022 B - Approved as noted Answered
CO SU 10/17/2022 10/16/2022 B - Approved as noted Answered
NT C 10/17/2022 10/16/2022 B - Approved as noted Answered
CO S 10/31/2022 10/30/2022 B - Approved as noted Answered
CO A 10/31/2022 10/30/2022 B - Approved as noted Answered
CO SU 10/31/2022 10/30/2022 B - Approved as noted Answered
CO C 11/5/2022 10/30/2022 B - Approved as noted Answered
CO C 10/31/2022 10/30/2022 B - Approved as noted Answered
CO C 10/31/2022 10/30/2022 B - Approved as noted Answered
CO C 10/31/2022 10/30/2022 B - Approved as noted Answered
CO SU 10/31/2022 10/30/2022 B - Approved as noted Answered
CC SU 10/31/2022 10/30/2022 B - Approved as noted Answered
CO C 10/29/2022 10/27/2022 B - Approved as noted Answered
CO SU 10/31/2022 10/30/2022 B - Approved as noted Answered
CO A 10/29/2022 10/27/2022 B - Approved as noted Answered
CO A 10/29/2022 10/27/2022 B - Approved as noted Answered
CO A 10/29/2022 10/27/2022 B - Approved as noted Answered
CO A 10/29/2022 10/27/2022 B - Approved as noted Answered
EC S 10/29/2022 10/29/2022 B - Approved as noted Answered
CO S 10/31/2022 10/30/2022 C - Revise & Resubmit Answered
CO S 10/31/2022 10/30/2022 B - Approved as noted Answered
MC S 10/31/2022 10/30/2022 B - Approved as noted Answered
MC S 10/31/2022 10/30/2022 B - Approved as noted Answered
VG S 10/31/2022 10/30/2022 B - Approved as noted Answered
NA S 10/31/2022 10/30/2022 B - Approved as noted Answered
CO S 10/31/2022 10/30/2022 B - Approved as noted Answered
CO S 10/31/2022 10/30/2022 B - Approved as noted Answered
CO S 10/31/2022 10/30/2022 B - Approved as noted Answered
CC S 10/31/2022 10/30/2022 B - Approved as noted Answered
CO S 10/31/2022 10/30/2022 B - Approved as noted Answered
CO S 10/31/2022 10/30/2022 B - Approved as noted Answered
CO S 10/31/2022 10/30/2022 B - Approved as noted Answered
CO S 10/31/2022 10/30/2022 B - Approved as noted Answered
CO A 10/27/2022 10/26/2022 B - Approved as noted Answered
LM SU 10/27/2022 10/26/2022 B - Approved as noted Answered
CO S 10/31/2022 10/30/2022 B - Approved as noted Answered
CO S 10/31/2022 10/30/2022 B - Approved as noted Answered
CO S 10/31/2022 10/30/2022 B - Approved as noted Answered
CO S 10/31/2022 10/30/2022 B - Approved as noted Answered
CO S 10/31/2022 10/30/2022 B - Approved as noted Answered
EC S 10/31/2022 10/30/2022 B - Approved as noted Answered
SW P 10/31/2022 10/30/2022 B - Approved as noted Answered
SW P 10/31/2022 10/30/2022 B - Approved as noted Answered
SW M 10/31/2022 10/30/2022 B - Approved as noted Answered
MC SU 10/30/2022 10/29/2022 B - Approved as noted Answered
MC SU 10/30/2022 10/29/2022 B - Approved as noted Answered
MB A 10/30/2022 10/29/2022 B - Approved as noted Answered
AG A 10/30/2022 10/29/2022 B - Approved as noted Answered
TT A 10/30/2022 10/29/2022 B - Approved as noted Answered
WG C 10/30/2022 10/29/2022 B - Approved as noted Answered
WG C 10/30/2022 10/29/2022 B - Approved as noted Answered
TG C 10/30/2022 10/29/2022 B - Approved as noted Answered
TG C 11/5/2022 10/29/2022 B - Approved as noted Answered
TG C 10/30/2022 10/29/2022 B - Approved as noted Answered
CC S 10/18/2022 10/17/2022 B - Approved as noted Answered
MC S 10/30/2022 10/29/2022 B - Approved as noted Answered
MC S 10/30/2022 10/29/2022 B - Approved as noted Answered
CO C 10/30/2022 10/29/2022 B - Approved as noted Answered
CC S 10/19/2022 10/18/2022 B - Approved as noted Answered
CO SU 10/30/2022 10/29/2022 B - Approved as noted Answered
LM S 10/25/2022 10/24/2022 B - Approved as noted Answered
MC S 10/30/2022 10/29/2022 B - Approved as noted Answered
CO S 10/24/2022 10/23/2022 B - Approved as noted Answered
MC S 10/30/2022 10/29/2022 B - Approved as noted Answered
SM S 10/30/2022 10/29/2022 B - Approved as noted Answered
EC S 10/30/2022 10/29/2022 B - Approved as noted Answered
CO S 11/3/2022 10/29/2022 C - Revise & Resubmit Answered
CO S 10/30/2022 10/29/2022 B - Approved as noted Answered
CO S 10/30/2022 10/29/2022 C - Revise & Resubmit Answered
CO A 10/27/2022 10/26/2022 B - Approved as noted Answered
LM S 9/14/2022 9/13/2022 B - Approved as noted Answered
CO C 9/14/2022 9/13/2022 B - Approved as noted Answered
TB E 10/29/2022 10/27/2022 B - Approved as noted Answered
TG C 10/12/2022 10/11/2022 C - Revise & Resubmit Answered
TB E 10/29/2022 10/27/2022 B - Approved as noted Answered
CO C 10/29/2022 10/27/2022 B - Approved as noted Answered
CO C 10/29/2022 10/27/2022 B - Approved as noted Answered
CO C 10/29/2022 10/27/2022 B - Approved as noted Answered
CO A 10/29/2022 10/27/2022 B - Approved as noted Answered
JG C 10/29/2022 10/27/2022 B - Approved as noted Answered
VG C 10/29/2022 10/27/2022 B - Approved as noted Answered
JG C 10/29/2022 10/27/2022 B - Approved as noted Answered
NA SU 10/29/2022 10/27/2022 B - Approved as noted Answered
EC SU 10/27/2022 10/27/2022 B - Approved as noted Answered
EC SU 10/29/2022 10/27/2022 B - Approved as noted Answered
EC SU 10/29/2022 10/27/2022 B - Approved as noted Answered
CO SU 10/29/2022 10/27/2022 B - Approved as noted Answered
CO SS 10/29/2022 10/27/2022 B - Approved as noted Answered
CC S 10/31/2022 10/27/2022 B - Approved as noted Answered
NA S 10/29/2022 10/27/2022 B - Approved as noted Answered
EC S 10/29/2022 10/27/2022 B - Approved as noted Answered
EC S 10/29/2022 10/27/2022 B - Approved as noted Answered
WG S 10/5/2022 10/4/2022 C - Revise & Resubmit Answered
EC S 10/29/2022 10/27/2022 B - Approved as noted Answered
EC S 10/29/2022 10/27/2022 B - Approved as noted Answered
CO S 10/29/2022 10/27/2022 B - Approved as noted Answered
VG S 10/29/2022 10/27/2022 B - Approved as noted Answered
CO S 10/29/2022 10/27/2022 B - Approved as noted Answered
CO S 10/29/2022 10/27/2022 B - Approved as noted Answered
CO S 10/29/2022 10/27/2022 B - Approved as noted Answered
CO S 10/29/2022 10/27/2022 B - Approved as noted Answered
CO S 10/29/2022 10/27/2022 B - Approved as noted Answered
CO S 10/29/2022 10/27/2022 B - Approved as noted Answered
MC SU 10/19/2022 10/18/2022 B - Approved as noted Answered
CO C 10/19/2022 10/18/2022 B - Approved as noted Answered
TG LS 10/29/2022 10/27/2022 B - Approved as noted Answered
WG C 10/29/2022 10/27/2022 B - Approved as noted Answered
WG C 10/29/2022 10/27/2022 B - Approved as noted Answered
PG C 10/29/2022 10/27/2022 B - Approved as noted Answered
WG C 10/29/2022 10/27/2022 B - Approved as noted Answered
WG C 10/29/2022 10/27/2022 B - Approved as noted Answered
WG C 10/29/2022 10/27/2022 B - Approved as noted Answered
WG C 10/29/2022 10/27/2022 B - Approved as noted Answered
SW C 10/30/2022 10/29/2022 B - Approved as noted Answered
SW C 10/30/2022 10/29/2022 B - Approved as noted Answered
SW C 10/30/2022 10/29/2022 B - Approved as noted Answered
SW C 10/30/2022 10/29/2022 B - Approved as noted Answered
SW C 10/30/2022 10/29/2022 B - Approved as noted Answered
SW C 10/30/2022 10/29/2022 B - Approved as noted Answered
SW C 10/30/2022 10/29/2022 B - Approved as noted Answered
SW C 10/30/2022 10/29/2022 B - Approved as noted Answered
WG SU 10/29/2022 10/27/2022 B - Approved as noted Answered
WG SU 10/29/2022 10/27/2022 B - Approved as noted Answered
WG SU 10/29/2022 10/27/2022 B - Approved as noted Answered
PG SU 10/29/2022 11/27/2022 B - Approved as noted Answered
PG S 11/1/2022 10/27/2022 B - Approved as noted Answered
PG S 10/29/2022 10/27/2022 B - Approved as noted Answered
WG S 10/29/2022 10/27/2022 B - Approved as noted Answered
MB A 10/29/2022 10/27/2022 B - Approved as noted Answered
WG E 10/29/2022 10/27/2022 B - Approved as noted Answered
TG E 10/25/2022 10/24/2022 B - Approved as noted Answered
TG LC 10/25/2022 10/24/2022 B - Approved as noted Answered
SW C 10/29/2022 10/27/2022 B - Approved as noted Answered
SW C 10/29/2022 10/27/2022 B - Approved as noted Answered
SW C 10/29/2022 10/27/2022 B - Approved as noted Answered
SW C 10/29/2022 10/27/2022 B - Approved as noted Answered
SW C 10/29/2022 10/27/2022 B - Approved as noted Answered
SW C 10/29/2022 10/27/2022 B - Approved as noted Answered
SW C 10/29/2022 10/27/2022 B - Approved as noted Answered
SW C 10/29/2022 10/27/2022 B - Approved as noted Answered
SW C 10/29/2022 10/27/2022 B - Approved as noted Answered
SW C 10/29/2022 10/27/2022 B - Approved as noted Answered
SW C 10/29/2022 10/27/2022 B - Approved as noted Answered
SW C 10/29/2022 10/27/2022 B - Approved as noted Answered
PA LS 11/1/2022 10/27/2022 B - Approved as noted Answered
SW C 10/27/2022 10/26/2022 B - Approved as noted Answered
SW C 10/27/2022 10/26/2022 B - Approved as noted Answered
SW C 10/27/2022 10/26/2022 B - Approved as noted Answered
SW C 10/27/2022 10/26/2022 B - Approved as noted Answered
SW C 10/27/2022 10/23/2022 B - Approved as noted Answered
SW C 10/27/2022 10/26/2022 B - Approved as noted Answered
SW C 10/27/2022 10/26/2022 B - Approved as noted Answered
SW C 10/27/2022 10/26/2022 B - Approved as noted Answered
SW C 10/27/2022 10/26/2022 B - Approved as noted Answered
SW C 11/5/2022 10/26/2022 B - Approved as noted Answered
SW C 10/27/2022 10/26/2022 B - Approved as noted Answered
SW C 10/27/2022 10/26/2022 B - Approved as noted Answered
SW C 10/27/2022 10/26/2022 B - Approved as noted Answered
SW C 10/27/2022 10/26/2022 B - Approved as noted Answered
CO A 10/27/2022 10/26/2022 B - Approved as noted Answered
SW C 10/27/2022 10/26/2022 B - Approved as noted Answered
SW C 10/27/2022 10/26/2022 B - Approved as noted Answered
SW C 10/27/2022 10/26/2022 B - Approved as noted Answered
SW C 10/27/2022 10/26/2022 B - Approved as noted Answered
SW LS 10/27/2022 10/26/2022 B - Approved as noted Answered
PA LS 10/27/2022 10/26/2022 B - Approved as noted Answered
PA LS 10/27/2022 10/26/2022 B - Approved as noted Answered
CO S 10/24/2022 10/23/2022 B - Approved as noted Answered
CO S 10/24/2022 10/23/2022 B - Approved as noted Answered
PG C 10/27/2022 10/26/2022 B - Approved as noted Answered
PG C 10/27/2022 10/26/2022 B - Approved as noted Answered
PG S 10/27/2022 10/26/2022 B - Approved as noted Answered
WG A 10/27/2022 10/26/2022 B - Approved as noted Answered
AG A 10/27/2022 10/26/2022 B - Approved as noted Answered
CO A 10/27/2022 10/26/2022 B - Approved as noted Answered
AG A 10/27/2022 10/26/2022 B - Approved as noted Answered
CO A 10/27/2022 10/26/2022 B - Approved as noted Answered
EC C 10/27/2022 10/26/2022 B - Approved as noted Answered
CO C 10/31/2022 10/26/2022 B - Approved as noted Answered
CO C 10/27/2022 10/26/2022 B - Approved as noted Answered
CO C 10/27/2022 10/26/2022 B - Approved as noted Answered
CO C 10/27/2022 10/26/2022 B - Approved as noted Answered
CO C 10/27/2022 10/26/2022 B - Approved as noted Answered
CO SU 10/27/2022 10/26/2022 B - Approved as noted Answered
CO SU 10/27/2022 10/26/2022 B - Approved as noted Answered
CO SU 10/27/2022 10/26/2022 B - Approved as noted Answered
CO SU 10/27/2022 10/26/2022 B - Approved as noted Answered
MC SU 10/27/2022 10/26/2022 B - Approved as noted Answered
CO S 10/27/2022 10/26/2022 B - Approved as noted Answered
CO S 10/27/2022 10/26/2022 B - Approved as noted Answered
CO S 10/27/2022 10/26/2022 B - Approved as noted Answered
CO S 10/27/2022 10/26/2022 B - Approved as noted Answered
CO S 10/27/2022 10/26/2022 B - Approved as noted Answered
CO S 10/27/2022 10/26/2022 B - Approved as noted Answered
CO S 10/27/2022 10/26/2022 B - Approved as noted Answered
CO S 10/27/2022 10/26/2022 B - Approved as noted Answered
SM S 10/27/2022 10/26/2022 B - Approved as noted Answered
CO S 10/27/2022 10/26/2022 B - Approved as noted Answered
CO S 10/27/2022 10/26/2022 B - Approved as noted Answered
LM S 10/27/2022 10/26/2022 B - Approved as noted Answered
LM S 10/27/2022 10/26/2022 B - Approved as noted Answered
LM S 10/27/2022 10/26/2022 B - Approved as noted Answered
MC S 10/27/2022 10/26/2022 B - Approved as noted Answered
MC S 10/27/2022 10/26/2022 B - Approved as noted Answered
MC S 10/27/2022 10/26/2022 B - Approved as noted Answered
CO S 10/27/2022 10/26/2022 B - Approved as noted Answered
CO S 10/27/2022 10/26/2022 B - Approved as noted Answered
CO S 10/27/2022 10/26/2022 B - Approved as noted Answered
CO S 11/2/2022 11/1/2022 B - Approved as noted Answered
CO S 11/2/2022 11/1/2022 B - Approved as noted Answered
CC S 10/24/2022 10/23/2022 B - Approved as noted Answered
CC S 10/24/2022 10/23/2022 B - Approved as noted Answered
CC SU 10/24/2022 10/23/2022 B - Approved as noted Answered
CO S 10/24/2022 10/23/2022 B - Approved as noted Answered
CO S 10/24/2022 10/23/2022 B - Approved as noted Answered
CO SU 10/24/2022 10/23/2022 B - Approved as noted Answered
EC SU 10/24/2022 10/23/2022 B - Approved as noted Answered
SR LC 10/27/2022 10/26/2022 B - Approved as noted Answered
EC SU 10/24/2022 10/23/2022 B - Approved as noted Answered
CO SU 10/24/2022 10/23/2022 B - Approved as noted Answered
SW E 10/30/2022 10/26/2022 B - Approved as noted Answered
CO C 10/24/2022 10/23/2022 B - Approved as noted Answered
CO C 10/24/2022 10/23/2022 B - Approved as noted Answered
CO C 10/24/2022 10/23/2022 B - Approved as noted Answered
CO C 10/24/2022 10/23/2022 B - Approved as noted Answered
CO C 10/24/2022 10/23/2022 B - Approved as noted Answered
CO C 10/24/2022 10/23/2022 B - Approved as noted Answered
CO C 10/25/2022 10/24/2022 B - Approved as noted Answered
CO C 10/25/2022 10/24/2022 B - Approved as noted Answered
CO C 10/25/2022 10/24/2022 B - Approved as noted Answered
VG C 10/25/2022 10/24/2022 B - Approved as noted Answered
VG C 10/27/2022 10/24/2022 B - Approved as noted Answered
JG C 10/25/2022 10/24/2022 B - Approved as noted Answered
MC SU 10/23/2022 10/22/2022 B - Approved as noted Answered
MC S 10/23/2022 10/22/2022 B - Approved as noted Answered
MC S 10/23/2022 10/22/2022 B - Approved as noted Answered
MC S 10/23/2022 10/22/2022 B - Approved as noted Answered
LM S 10/23/2022 10/22/2022 B - Approved as noted Answered
CO A 10/3/2022 10/2/2022 B - Approved as noted Answered
EC S 10/23/2022 10/22/2022 B - Approved as noted Answered
CO S 10/23/2022 10/22/2022 B - Approved as noted Answered
CO S 10/23/2022 10/22/2022 B - Approved as noted Answered
CO S 10/23/2022 10/22/2022 B - Approved as noted Answered
CC S 10/23/2022 10/22/2022 B - Approved as noted Answered
CO S 10/23/2022 10/22/2022 B - Approved as noted Answered
CO S 10/23/2022 10/22/2022 B - Approved as noted Answered
CO S 10/23/2022 10/22/2022 B - Approved as noted Answered
LM SU 10/23/2022 10/22/2022 B - Approved as noted Answered
CO SU 10/23/2022 10/22/2022 B - Approved as noted Answered
EC SU 10/23/2022 10/22/2022 B - Approved as noted Answered
CO A 10/27/2022 10/26/2022 B - Approved as noted Answered
CO SU 10/23/2022 10/22/2022 B - Approved as noted Answered
CO A 10/27/2022 10/26/2022 B - Approved as noted Answered
CO SU 10/23/2022 10/22/2022 B - Approved as noted Answered
CO A 10/27/2022 10/26/2022 B - Approved as noted Answered
CO A 10/27/2022 10/26/2022 B - Approved as noted Answered
CO SU 10/23/2022 10/22/2022 B - Approved as noted Answered
CO A 10/27/2022 10/26/2022 B - Approved as noted Answered
CO A 10/27/2022 10/26/2022 B - Approved as noted Answered
CO SU 10/23/2022 10/22/2022 B - Approved as noted Answered
CO A 10/25/2022 10/24/2022 B - Approved as noted Answered
CO A 10/25/2022 10/24/2022 B - Approved as noted Answered
CO A 10/25/2022 10/24/2022 B - Approved as noted Answered
CO A 10/24/2022 10/23/2022 B - Approved as noted Answered
CO A 10/24/2022 10/23/2022 B - Approved as noted Answered
CO A 10/24/2022 10/23/2022 B - Approved as noted Answered
CO A 10/24/2022 10/23/2022 B - Approved as noted Answered
CO A 10/24/2022 10/23/2022 B - Approved as noted Answered
CO A 10/24/2022 10/23/2022 B - Approved as noted Answered
CO A 10/24/2022 10/23/2022 B - Approved as noted Answered
CO A 10/24/2022 10/23/2022 B - Approved as noted Answered
TT E 10/30/2022 10/24/2022 B - Approved as noted Answered
CO A 10/3/2022 10/2/2022 B - Approved as noted Answered
TT E 10/30/2022 10/24/2022 B - Approved as noted Answered
CO S 10/23/2022 10/22/2022 B - Approved as noted Answered
CO S 10/23/2022 10/22/2022 B - Approved as noted Answered
SW E 10/25/2022 10/24/2022 B - Approved as noted Answered
CO A 10/24/2022 10/23/2022 B - Approved as noted Answered
CO S 10/23/2022 10/22/2022 B - Approved as noted Answered
CO S 10/23/2022 10/22/2022 B - Approved as noted Answered
CO A 10/24/2022 10/23/2022 B - Approved as noted Answered
CF LC 10/26/2022 10/25/2022 B - Approved as noted Answered
CF LC 10/26/2022 10/25/2022 B - Approved as noted Answered
SW M 10/27/2022 10/26/2022 B - Approved as noted Answered
SW M 10/27/2022 10/26/2022 B - Approved as noted Answered
CO SU 10/25/2022 10/24/2022 B - Approved as noted Answered
CO SU 10/25/2022 10/24/2022 B - Approved as noted Answered
VG C 10/19/2022 10/20/2022 B - Approved as noted Answered
LM SU 10/25/2022 10/24/2022 B - Approved as noted Answered
CO S 10/25/2022 10/24/2022 B - Approved as noted Answered
CO C 10/22/2022 10/20/2022 B - Approved as noted Answered
CO S 10/25/2022 10/24/2022 B - Approved as noted Answered
CO C 10/25/2022 10/24/2022 B - Approved as noted Answered
CO S 10/25/2022 10/24/2022 B - Approved as noted Answered
CO S 10/25/2022 10/24/2022 B - Approved as noted Answered
CO C 10/22/2022 10/20/2022 B - Approved as noted Answered
EC S 10/25/2022 10/24/2022 B - Approved as noted Answered
EC S 10/25/2022 10/24/2022 B - Approved as noted Answered
ST S 10/25/2022 10/24/2022 B - Approved as noted Answered
CO C 10/22/2022 10/20/2022 B - Approved as noted Answered
CO S 10/25/2022 10/24/2022 B - Approved as noted Answered
EC C 10/27/2022 10/26/2022 B - Approved as noted Answered
MC S 10/25/2022 10/24/2022 B - Approved as noted Answered
CO S 10/25/2022 10/24/2022 B - Approved as noted Answered
CO S 10/25/2022 10/24/2022 B - Approved as noted Answered
LM S 10/25/2022 10/24/2022 B - Approved as noted Answered
NA S 10/25/2022 10/24/2022 B - Approved as noted Answered
CF S 10/18/2022 10/17/2022 B - Approved as noted Answered
CO S 10/25/2022 10/24/2022 B - Approved as noted Answered
CO S 10/25/2022 10/24/2022 B - Approved as noted Answered
CO S 10/25/2022 10/24/2022 C - Revise & Resubmit Answered
CO S 10/25/2022 10/24/2022 B - Approved as noted Answered
CF S 10/13/2022 10/12/2022 B - Approved as noted Answered
VG C 10/29/2022 10/25/2022 B - Approved as noted Answered
CO C 10/29/2022 10/25/2022 B - Approved as noted Answered
CO C 10/26/2022 10/25/2022 B - Approved as noted Answered
CO C 10/26/2022 10/25/2022 B - Approved as noted Answered
CO C 10/26/2022 10/25/2022 B - Approved as noted Answered
CO SU 10/26/2022 10/25/2022 B - Approved as noted Answered
EC S 10/22/2022 10/20/2022 B - Approved as noted Answered
CO SU 10/26/2022 10/25/2022 B - Approved as noted Answered
EC S 10/22/2022 10/20/2022 B - Approved as noted Answered
CO S 10/26/2022 10/26/2022 B - Approved as noted Answered
CO S 10/26/2022 10/26/2022 B - Approved as noted Answered
CO S 10/25/2022 10/20/2022 C - Revise & Resubmit Answered
CO S 10/22/2022 10/20/2022 B - Approved as noted Answered
CO S 10/22/2022 10/20/2022 B - Approved as noted Answered
CO S 10/22/2022 10/20/2022 B - Approved as noted Answered
CO S 10/26/2022 10/25/2022 B - Approved as noted Answered
CO SS 10/22/2022 10/20/2022 B - Approved as noted Answered
CO S 10/26/2022 10/25/2022 B - Approved as noted Answered
CO S 10/22/2022 10/20/2022 B - Approved as noted Answered
CO S 10/22/2022 10/20/2022 B - Approved as noted Answered
CO S 10/25/2022 10/20/2022 B - Approved as noted Answered
TG LS 10/26/2022 10/25/2022 B - Approved as noted Answered
CO S 10/22/2022 10/20/2022 B - Approved as noted Answered
TG LS 10/26/2022 10/25/2022 B - Approved as noted Answered
CO S 10/22/2022 10/20/2022 B - Approved as noted Answered
SG S 10/26/2022 10/25/2022 B - Approved as noted Answered
WG S 10/26/2022 10/25/2022 B - Approved as noted Answered
CO S 10/26/2022 10/25/2022 B - Approved as noted Answered
CO S 10/26/2022 10/25/2022 B - Approved as noted Answered
DG S 10/26/2022 10/25/2022 B - Approved as noted Answered
DG S 10/26/2022 10/25/2022 B - Approved as noted Answered
CO S 10/26/2022 10/25/2022 B - Approved as noted Answered
WG S 10/26/2022 10/25/2022 C - Revise & Resubmit Answered
CF SU 10/18/2022 10/17/2022 B - Approved as noted Answered
BO E 10/6/2022 10/5/2022 C - Revise & Resubmit Answered
EC SU 10/22/2022 10/20/2022 B - Approved as noted Answered
EC SU 10/22/2022 10/20/2022 B - Approved as noted Answered
CO SU 10/22/2022 10/20/2022 B - Approved as noted Answered
CO SU 10/22/2022 10/20/2022 B - Approved as noted Answered
CO S 10/26/2022 10/25/2022 B - Approved as noted Answered
CO SU 10/22/2022 10/20/2022 B - Approved as noted Answered
CO S 10/26/2022 10/25/2022 B - Approved as noted Answered
CO SU 10/22/2022 10/20/2022 B - Approved as noted Answered
CO S 10/26/2022 10/25/2022 C - Revise & Resubmit Answered
CO SU 10/22/2022 10/20/2022 B - Approved as noted Answered
CO S 10/26/2022 10/25/2022 B - Approved as noted Answered
CO SU 10/22/2022 10/20/2022 B - Approved as noted Answered
VG S 10/26/2022 10/25/2022 B - Approved as noted Answered
NA SU 10/22/2022 10/22/2022 B - Approved as noted Answered
CO S 10/26/2022 10/25/2022 C - Revise & Resubmit Answered
VG S 10/26/2022 10/25/2022 B - Approved as noted Answered
MC S 10/26/2022 10/25/2022 B - Approved as noted Answered
CO SU 10/16/2022 10/19/2022 B - Approved as noted Answered
CC SU 10/20/2022 10/19/2022 B - Approved as noted Answered
CO SU 10/20/2022 10/19/2022 B - Approved as noted Answered
CO C 10/23/2022 10/19/2022 B - Approved as noted Answered
CO C 10/20/2022 10/19/2022 B - Approved as noted Answered
CO S 10/20/2022 10/19/2022 B - Approved as noted Answered
CO S 10/20/2022 10/19/2022 B - Approved as noted Answered
MC S 10/20/2022 10/20/2022 B - Approved as noted Answered
CO S 10/20/2022 10/19/2022 B - Approved as noted Answered
CO S 10/24/2022 10/23/2022 B - Approved as noted Answered
EC S 10/29/2022 10/23/2022 B - Approved as noted Answered
EC S 10/29/2022 10/23/2022 B - Approved as noted Answered
CO S 10/24/2022 10/23/2022 B - Approved as noted Answered
CF S 10/24/2022 10/23/2022 B - Approved as noted Answered
CO S 10/24/2022 10/23/2022 B - Approved as noted Answered
VG S 10/24/2022 10/23/2022 B - Approved as noted Answered
CO A 10/24/2022 10/23/2022 B - Approved as noted Answered
CO S 10/24/2022 10/23/2022 B - Approved as noted Answered
CO S 10/24/2022 10/23/2022 B - Approved as noted Answered
CO S 10/24/2022 10/23/2022 B - Approved as noted Answered
ZG S 10/26/2022 10/25/2022 B - Approved as noted Answered
CO S 10/24/2022 10/23/2022 B - Approved as noted Answered
SW C 10/12/2022 10/11/2022 C - Revise & Resubmit Answered
ZG S 10/26/2022 10/25/2022 B - Approved as noted Answered
AG A 10/26/2022 10/25/2022 B - Approved as noted Answered
WG A 10/26/2022 10/25/2022 B - Approved as noted Answered
PG C 10/26/2022 10/25/2022 B - Approved as noted Answered
WG C 10/26/2022 10/25/2022 B - Approved as noted Answered
PG C 10/26/2022 10/25/2022 B - Approved as noted Answered
WG C 10/25/2022 10/25/2022 B - Approved as noted Answered
PC P 10/29/2022 10/25/2022 B - Approved as noted Answered
PC P 10/29/2022 10/25/2022 B - Approved as noted Answered
SW C 10/27/2022 10/25/2022 B - Approved as noted Answered
SW C 10/26/2022 10/25/2022 B - Approved as noted Answered
SW C 10/26/2022 10/25/2022 B - Approved as noted Answered
SW C 10/26/2022 10/25/2022 B - Approved as noted Answered
SW C 11/2/2022 10/25/2022 B - Approved as noted Answered
MB A 10/25/2022 10/24/2022 B - Approved as noted Answered
TT A 10/25/2022 10/24/2022 B - Approved as noted Answered
PA LS 10/26/2022 10/25/2022 B - Approved as noted Answered
PG S 10/25/2022 10/24/2022 B - Approved as noted Answered
PG S 10/25/2022 10/24/2022 B - Approved as noted Answered
TG LS 10/29/2022 10/24/2022 C - Revise & Resubmit Answered
PA LS 10/26/2022 10/25/2022 B - Approved as noted Answered
WG C 10/25/2022 B - Approved as noted Answered
WG C 10/25/2022 10/24/2022 B - Approved as noted Answered
WG C 10/25/2022 10/24/2022 B - Approved as noted Answered
WG C 10/25/2022 10/24/2022 B - Approved as noted Answered
SW C 10/24/2022 10/23/2022 B - Approved as noted Answered
SW C 10/24/2022 10/23/2022 B - Approved as noted Answered
SW C 10/24/2022 10/23/2022 B - Approved as noted Answered
PC S 9/28/2022 9/27/2022 C - Revise & Resubmit Answered
CO SU 10/20/2022 10/19/2022 B - Approved as noted Answered
CC S 10/20/2022 10/19/2022 B - Approved as noted Answered
CO C 10/19/2022 10/18/2022 B - Approved as noted Answered
CO S 10/19/2022 10/18/2022 B - Approved as noted Answered
SW LS 10/25/2022 10/24/2022 B - Approved as noted Answered
SW LS 10/25/2022 10/24/2022 B - Approved as noted Answered
SW LS 10/25/2022 10/24/2022 B - Approved as noted Answered
SW LS 10/25/2022 10/24/2022 B - Approved as noted Answered
PA LS 10/25/2022 10/24/2022 B - Approved as noted Answered
SW C 10/25/2022 10/24/2022 B - Approved as noted Answered
SW C 10/25/2022 10/24/2022 B - Approved as noted Answered
SW C 10/25/2022 10/24/2022 B - Approved as noted Answered
SW C 10/25/2022 10/24/2022 B - Approved as noted Answered
SW C 10/25/2022 10/24/2022 B - Approved as noted Answered
CO S 10/18/2022 10/17/2022 B - Approved as noted Answered
CO S 10/18/2022 10/17/2022 C - Revise & Resubmit Answered
SW C 10/25/2022 10/24/2022 B - Approved as noted Answered
SW C 10/25/2022 10/24/2022 B - Approved as noted Answered
PG LS 10/25/2022 10/24/2022 A - Approved Answered
PG LC 10/23/2022 10/23/2022 B - Approved as noted Answered
PG LC 10/23/2022 10/23/2022 B - Approved as noted Answered
TT LC 10/24/2022 10/23/2022 B - Approved as noted Answered
TT LC 10/24/2022 10/23/2022 B - Approved as noted Answered
CC LC 10/24/2022 10/23/2022 B - Approved as noted Answered
SR LC 10/24/2022 10/23/2022 B - Approved as noted Answered
CC LC 10/24/2022 10/23/2022 B - Approved as noted Answered
NA LC 10/24/2022 10/23/2022 B - Approved as noted Answered
TT E 10/30/2022 10/23/2022 B - Approved as noted Answered
TT E 10/30/2022 10/23/2022 B - Approved as noted Answered
PC E 10/24/2022 10/23/2022 B - Approved as noted Answered
PC P 10/24/2022 10/23/2022 B - Approved as noted Answered
PC LS 10/24/2022 10/23/2022 B - Approved as noted Answered
SW LS 10/24/2022 10/23/2022 B - Approved as noted Answered
SW C 10/24/2022 10/23/2022 B - Approved as noted Answered
SW C 10/24/2022 10/23/2022 B - Approved as noted Answered
SW C 10/24/2022 10/23/2022 B - Approved as noted Answered
SW C 10/24/2022 10/23/2022 B - Approved as noted Answered
SW C 10/24/2022 10/23/2022 C - Revise & Resubmit Answered
SW C 10/24/2022 10/23/2022 B - Approved as noted Answered
SW C 10/24/2022 10/23/2022 B - Approved as noted Answered
SW C 10/24/2022 10/23/2022 B - Approved as noted Answered
WG C 10/24/2022 10/23/2022 B - Approved as noted Answered
WG C 10/24/2022 10/23/2022 B - Approved as noted Answered
SW C 10/24/2022 10/23/2022 B - Approved as noted Answered
WG C 10/24/2022 10/23/2022 B - Approved as noted Answered
SW C 10/24/2022 10/23/2022 B - Approved as noted Answered
WG C 10/24/2022 10/23/2022 B - Approved as noted Answered
MB S 10/27/2022 10/23/2022 B - Approved as noted Answered
WG SU 10/24/2022 10/23/2022 B - Approved as noted Answered
SW C 10/24/2022 10/23/2022 B - Approved as noted Answered
MB SU 10/24/2022 10/23/2022 B - Approved as noted Answered
SW E 10/22/2022 10/20/2022 B - Approved as noted Answered
SW C 10/30/2022 10/23/2022 B - Approved as noted Answered
CC E 10/22/2022 10/20/2022 B - Approved as noted Answered
SW C 10/24/2022 10/23/2022 B - Approved as noted Answered
LM E 10/22/2022 10/20/2022 B - Approved as noted Answered
MB A 10/24/2022 10/23/2022 B - Approved as noted Answered
SW C 10/24/2022 10/23/2022 B - Approved as noted Answered
SW S 10/25/2022 10/23/2022 B - Approved as noted Answered
WG E 10/22/2022 10/20/2022 B - Approved as noted Answered
SW S 10/24/2022 10/23/2022 B - Approved as noted Answered
WG E 10/22/2022 10/20/2022 B - Approved as noted Answered
PA LS 10/24/2022 10/23/2022 B - Approved as noted Answered
SW E 10/22/2022 10/20/2022 B - Approved as noted Answered
SW LS 10/24/2022 10/23/2022 B - Approved as noted Answered
WG S 10/24/2022 10/23/2022 B - Approved as noted Answered
WG S 10/24/2022 10/23/2022 B - Approved as noted Answered
LM LC 10/22/2022 10/20/2022 B - Approved as noted Answered
SW C 10/24/2022 10/22/2022 B - Approved as noted Answered
SW C 10/23/2022 10/22/2022 B - Approved as noted Answered
CO S 10/17/2022 10/16/2022 B - Approved as noted Answered
MB E 10/23/2022 10/22/2022 B - Approved as noted Answered
WG E 10/22/2022 10/20/2022 B - Approved as noted Answered
PG E 10/19/2022 10/18/2022 B - Approved as noted Answered
PG E 10/19/2022 10/18/2022 B - Approved as noted Answered
WG C 10/22/2022 10/20/2022 B - Approved as noted Answered
WG LS 10/22/2022 10/20/2022 B - Approved as noted Answered
SW LC 10/22/2022 10/20/2022 B - Approved as noted Answered
SW LC 10/22/2022 10/20/2022 B - Approved as noted Answered
WG LS 10/23/2022 10/22/2022 B - Approved as noted Answered
WG LC 10/22/2022 10/20/2022 B - Approved as noted Answered
WG LC 10/22/2022 10/20/2022 B - Approved as noted Answered
TG LS 10/23/2022 10/22/2022 B - Approved as noted Answered
WG C 10/23/2022 10/22/2022 B - Approved as noted Answered
WG C 10/23/2022 10/22/2022 B - Approved as noted Answered
SW C 10/24/2022 10/22/2022 B - Approved as noted Answered
WG C 10/23/2022 10/22/2022 B - Approved as noted Answered
SW C 10/23/2022 10/22/2022 B - Approved as noted Answered
WG C 10/23/2022 10/22/2022 B - Approved as noted Answered
WG C 10/23/2022 10/22/2022 B - Approved as noted Answered
SW LS 10/23/2022 10/22/2022 B - Approved as noted Answered
WG C 10/23/2022 10/22/2022 B - Approved as noted Answered
SW LS 10/23/2022 10/22/2022 B - Approved as noted Answered
SW LS 10/23/2022 10/22/2022 B - Approved as noted Answered
WG C 10/23/2022 10/22/2022 B - Approved as noted Answered
SW LS 10/22/2022 10/20/2022 B - Approved as noted Answered
SW C 10/22/2022 10/20/2022 B - Approved as noted Answered
SW C 10/22/2022 10/20/2022 B - Approved as noted Answered
SW C 10/22/2022 10/20/2022 B - Approved as noted Answered
SW C 10/22/2022 10/20/2022 B - Approved as noted Answered
SW C 10/22/2022 10/20/2022 B - Approved as noted Answered
SW C 10/22/2022 10/20/2022 B - Approved as noted Answered
SW C 10/22/2022 10/20/2022 B - Approved as noted Answered
ZG A 10/22/2022 10/20/2022 B - Approved as noted Answered
PG A 10/22/2022 10/20/2022 B - Approved as noted Answered
DG A 10/22/2022 10/20/2022 B - Approved as noted Answered
PG S 10/22/2022 10/20/2022 B - Approved as noted Answered
WG S 10/22/2022 10/20/2022 B - Approved as noted Answered
WG C 10/22/2022 10/20/2022 B - Approved as noted Answered
PG C 10/22/2022 10/20/2022 B - Approved as noted Answered
PG C 10/22/2022 10/20/2022 B - Approved as noted Answered
PG C 10/22/2022 10/20/2022 B - Approved as noted Answered
DG S 10/20/2022 10/19/2022 B - Approved as noted Answered
ZG S 10/20/2022 10/19/2022 B - Approved as noted Answered
PG C 10/20/2022 10/19/2022 B - Approved as noted Answered
WG C 10/20/2022 10/19/2022 B - Approved as noted Answered
WG C 10/20/2022 10/19/2022 B - Approved as noted Answered
WG LS 10/20/2022 10/19/2022 B - Approved as noted Answered
MB A 10/20/2022 10/19/2022 B - Approved as noted Answered
ZG A 10/20/2022 10/19/2022 B - Approved as noted Answered
NA LC 10/19/2022 10/18/2022 B - Approved as noted Answered
PG A 10/20/2022 10/19/2022 B - Approved as noted Answered
NA LC 10/19/2022 10/18/2022 C - Revise & Resubmit Answered
CC LC 10/19/2022 10/18/2022 B - Approved as noted Answered
CC LC 10/19/2022 10/18/2022 B - Approved as noted Answered
DG A 10/20/2022 10/18/2022 B - Approved as noted Answered
CC LC 10/19/2022 10/18/2022 B - Approved as noted Answered
AG A 10/20/2022 10/19/2022 B - Approved as noted Answered
AG A 10/20/2022 10/19/2022 B - Approved as noted Answered
MB A 10/20/2022 9/19/2022 B - Approved as noted Answered
EC A 10/20/2022 10/19/2022 B - Approved as noted Answered
CO C 10/20/2022 10/19/2022 B - Approved as noted Answered
CO SU 10/20/2022 10/19/2022 B - Approved as noted Answered
EC S 10/20/2022 10/19/2022 B - Approved as noted Answered
NT S 10/20/2022 10/19/2022 B - Approved as noted Answered
CO S 10/20/2022 10/19/2022 B - Approved as noted Answered
CO S 10/20/2022 10/19/2022 B - Approved as noted Answered
CO S 10/20/2022 10/19/2022 B - Approved as noted Answered
CO S 10/20/2022 10/19/2022 B - Approved as noted Answered
CO S 10/20/2022 10/19/2022 B - Approved as noted Answered
CO S 10/20/2022 10/19/2022 B - Approved as noted Answered
CC S 10/20/2022 10/19/2022 B - Approved as noted Answered
CO S 10/20/2022 10/19/2022 B - Approved as noted Answered
CO S 10/19/2022 10/19/2022 B - Approved as noted Answered
CO S 10/19/2022 10/18/2022 B - Approved as noted Answered
CO S 10/19/2022 10/18/2022 B - Approved as noted Answered
LM S 10/23/2022 10/18/2022 B - Approved as noted Answered
MC S 10/19/2022 10/18/2022 B - Approved as noted Answered
MC S 10/19/2022 10/18/2022 B - Approved as noted Answered
CO S 10/19/2022 10/18/2022 B - Approved as noted Answered
EC S 10/19/2022 10/18/2022 B - Approved as noted Answered
CC S 10/19/2022 10/19/2022 B - Approved as noted Answered
VG S 10/19/2022 10/18/2022 B - Approved as noted Answered
VG S 10/19/2022 10/18/2022 B - Approved as noted Answered
VG S 10/19/2022 10/18/2022 B - Approved as noted Answered
CO S 10/19/2022 10/18/2022 B - Approved as noted Answered
CO SU 10/19/2022 10/18/2022 B - Approved as noted Answered
VG C 10/19/2022 10/18/2022 B - Approved as noted Answered
VG C 10/19/2022 10/18/2022 C - Revise & Resubmit Answered
SW C 10/20/2022 10/19/2022 B - Approved as noted Answered
CO C 10/18/2022 10/17/2022 B - Approved as noted Answered
CO C 10/18/2022 10/17/2022 B - Approved as noted Answered
SW C 10/20/2022 10/19/2022 B - Approved as noted Answered
MC C 10/18/2022 10/17/2022 B - Approved as noted Answered
SW C 10/20/2022 10/19/2022 B - Approved as noted Answered
SW C 10/20/2022 10/19/2022 B - Approved as noted Answered
CO C 10/18/2022 10/17/2022 B - Approved as noted Answered
SW C 10/20/2022 10/19/2022 B - Approved as noted Answered
PA C 10/20/2022 10/19/2022 B - Approved as noted Answered
VG S 10/18/2022 10/17/2022 B - Approved as noted Answered
VG S 10/18/2022 10/17/2022 B - Approved as noted Answered
SW C 10/20/2022 10/19/2022 B - Approved as noted Answered
SW C 10/20/2022 10/19/2022 B - Approved as noted Answered
CO SU 10/18/2022 10/17/2022 B - Approved as noted Answered
SW C 10/20/2022 10/19/2022 B - Approved as noted Answered
SW C 10/20/2022 10/19/2022 B - Approved as noted Answered
SW C 10/20/2022 10/19/2022 B - Approved as noted Answered
CO S 10/18/2022 10/17/2022 B - Approved as noted Answered
SW C 10/20/2022 10/19/2022 B - Approved as noted Answered
VG S 10/18/2022 10/17/2022 B - Approved as noted Answered
CO S 10/23/2022 10/17/2022 B - Approved as noted Answered
SW C 10/20/2022 10/19/2022 B - Approved as noted Answered
EC S 10/18/2022 10/17/2022 B - Approved as noted Answered
SW C 10/20/2022 10/19/2022 B - Approved as noted Answered
NT S 10/18/2022 10/17/2022 B - Approved as noted Answered
SW C 10/20/2022 10/19/2022 B - Approved as noted Answered
NT S 10/18/2022 10/17/2022 B - Approved as noted Answered
NT SU 10/18/2022 10/17/2022 B - Approved as noted Answered
CO A 10/18/2022 10/17/2022 B - Approved as noted Answered
CO A 10/18/2022 10/17/2022 B - Approved as noted Answered
NA S 10/18/2022 10/17/2022 B - Approved as noted Answered
CO S 10/20/2022 10/19/2022 B - Approved as noted Answered
CO S 10/18/2022 10/17/2022 B - Approved as noted Answered
SW M 10/20/2022 10/19/2022 C - Revise & Resubmit Answered
SW C 10/20/2022 10/19/2022 C - Revise & Resubmit Answered
SW LS 10/20/2022 10/19/2022 A - Approved Answered
DG LS 10/19/2022 10/18/2022 B - Approved as noted Answered
TG LS 10/19/2022 10/18/2022 B - Approved as noted Answered
TG LS 10/19/2022 10/18/2022 B - Approved as noted Answered
PG C 10/19/2022 10/18/2022 B - Approved as noted Answered
WG C 10/19/2022 10/18/2022 B - Approved as noted Answered
WG C 10/19/2022 10/18/2022 B - Approved as noted Answered
WG C 10/19/2022 10/18/2022 B - Approved as noted Answered
WG C 10/19/2022 10/18/2022 B - Approved as noted Answered
WG S 10/23/2022 10/18/2022 C - Revise & Resubmit Answered
WG S 10/23/2022 10/18/2022 B - Approved as noted Answered
MB A 10/19/2022 10/18/2022 B - Approved as noted Answered
MB A 10/19/2022 10/18/2022 B - Approved as noted Answered
MB A 10/19/2022 10/18/2022 B - Approved as noted Answered
MB A 10/19/2022 10/19/2022 B - Approved as noted Answered
SW C 10/19/2022 10/18/2022 B - Approved as noted Answered
SW C 10/19/2022 10/18/2022 B - Approved as noted Answered
SW C 10/19/2022 10/18/2022 B - Approved as noted Answered
SW C 10/19/2022 10/18/2022 B - Approved as noted Answered
SW C 10/19/2022 10/18/2022 B - Approved as noted Answered
SW C 10/19/2022 10/18/2022 B - Approved as noted Answered
SW C 10/19/2022 10/18/2022 B - Approved as noted Answered
SW C 10/19/2022 10/18/2022 B - Approved as noted Answered
SW C 10/19/2022 10/18/2022 B - Approved as noted Answered
SW C 10/19/2022 10/18/2022 B - Approved as noted Answered
SW C 10/19/2022 10/18/2022 B - Approved as noted Answered
SW C 10/23/2022 10/18/2022 B - Approved as noted Answered
SW C 10/22/2022 10/18/2022 B - Approved as noted Answered
SW C 10/19/2022 10/18/2022 B - Approved as noted Answered
SW C 10/19/2022 10/18/2022 B - Approved as noted Answered
PA LS 10/19/2022 10/18/2022 B - Approved as noted Answered
PA LS 10/19/2022 10/18/2022 B - Approved as noted Answered
SW LS 10/19/2022 10/18/2022 B - Approved as noted Answered
CO A 9/15/2022 9/14/2022 B - Approved as noted Answered
CO A 9/17/2022 9/15/2022 B - Approved as noted Answered
MB LC 10/19/2022 10/17/2022 B - Approved as noted Answered
MB LC 10/18/2022 10/17/2022 B - Approved as noted Answered
CO A 10/16/2022 10/16/2022 B - Approved as noted Answered
CO A 10/17/2022 10/16/2022 B - Approved as noted Answered
CO A 10/17/2022 10/16/2022 C - Revise & Resubmit Answered
CC LC 10/19/2022 10/18/2022 B - Approved as noted Answered
MB S 10/18/2022 10/17/2022 B - Approved as noted Answered
MB A 10/20/2022 10/17/2022 B - Approved as noted Answered
MB A 10/18/2022 10/17/2022 B - Approved as noted Answered
MB A 10/20/2022 10/17/2022 B - Approved as noted Answered
MB A 10/19/2022 10/17/2022 B - Approved as noted Answered
MB A 10/18/2022 10/17/2022 B - Approved as noted Answered
MB A 10/18/2022 10/17/2022 B - Approved as noted Answered
SW LS 10/22/2022 10/17/2022 B - Approved as noted Answered
SW LS 10/22/2022 10/17/2022 B - Approved as noted Answered
SW LS 10/22/2022 10/17/2022 B - Approved as noted Answered
SW C 10/18/2022 10/17/2022 B - Approved as noted Answered
SW C 10/18/2022 10/17/2022 C - Revise & Resubmit Answered
SW C 10/18/2022 10/17/2022 B - Approved as noted Answered
SW C 10/18/2022 9/17/2022 B - Approved as noted Answered
SW C 10/18/2022 10/17/2022 B - Approved as noted Answered
SW C 10/18/2022 10/17/2022 B - Approved as noted Answered
SW C 10/18/2022 10/17/2022 B - Approved as noted Answered
SW C 10/18/2022 10/17/2022 B - Approved as noted Answered
SW C 10/18/2022 10/17/2022 B - Approved as noted Answered
SW C 10/18/2022 10/17/2022 B - Approved as noted Answered
SW C 10/18/2022 10/17/2022 C - Revise & Resubmit Answered
SW C 10/18/2022 10/17/2022 B - Approved as noted Answered
SW C 10/18/2022 10/17/2022 B - Approved as noted Answered
SW C 10/18/2022 10/17/2022 B - Approved as noted Answered
SW C 10/23/2022 10/17/2022 B - Approved as noted Answered
SW C 10/23/2022 11/17/2022 B - Approved as noted Answered
SW M 10/18/2022 10/17/2022 B - Approved as noted Answered
CC E 10/17/2022 10/16/2022 B - Approved as noted Answered
CO S 9/8/2022 9/7/2022 B - Approved as noted Answered
CO SU 9/9/2022 9/8/2022 B - Approved as noted Answered
WG C 10/17/2022 10/16/2022 B - Approved as noted Answered
TG LS 10/19/2022 10/16/2022 B - Approved as noted Answered
TG LS 10/17/2022 10/16/2022 B - Approved as noted Answered
WG S 10/17/2022 10/16/2022 B - Approved as noted Answered
WG S 10/17/2022 10/16/2022 B - Approved as noted Answered
SW C 10/18/2022 10/16/2022 B - Approved as noted Answered
SW C 10/17/2022 10/16/2022 B - Approved as noted Answered
SW C 10/18/2022 10/16/2022 B - Approved as noted Answered
SW C 10/18/2022 10/16/2022 B - Approved as noted Answered
SW C 10/19/2022 10/16/2022 B - Approved as noted Answered
SW C 10/19/2022 10/16/2022 B - Approved as noted Answered
SW C 10/17/2022 10/16/2022 B - Approved as noted Answered
SW C 10/17/2022 10/16/2022 B - Approved as noted Answered
SW C 10/18/2022 10/16/2022 B - Approved as noted Answered
SW C 10/18/2022 10/16/2022 B - Approved as noted Answered
SW C 10/18/2022 10/16/2022 B - Approved as noted Answered
SW C 10/22/2022 10/16/2022 B - Approved as noted Answered
SW C 10/17/2022 10/16/2022 B - Approved as noted Answered
SW C 10/25/2022 10/16/2022 B - Approved as noted Answered
SW C 10/18/2022 10/16/2022 B - Approved as noted Answered
SW C 10/18/2022 10/16/2022 B - Approved as noted Answered
SW C 10/17/2022 10/16/2022 B - Approved as noted Answered
SW C 10/18/2022 10/16/2022 B - Approved as noted Answered
PA LS 10/17/2022 10/16/2022 B - Approved as noted Answered
SW LS 10/17/2022 10/16/2022 B - Approved as noted Answered
MC C 10/18/2022 10/16/2022 B - Approved as noted Answered
CO C 10/18/2022 10/16/2022 B - Approved as noted Answered
SM SU 10/17/2022 10/16/2022 B - Approved as noted Answered
LM S 10/16/2022 10/11/2022 B - Approved as noted Answered
CO S 10/11/2022 10/10/2022 B - Approved as noted Answered
CO A 10/11/2022 10/10/2022 B - Approved as noted Answered
VG C 10/13/2022 10/10/2022 C - Revise & Resubmit Answered
CO C 10/11/2022 10/10/2022 B - Approved as noted Answered
CO SU 10/12/2022 11/11/2022 B - Approved as noted Answered
LM S 10/12/2022 10/11/2022 B - Approved as noted Answered
VG S 10/15/2022 10/13/2022 B - Approved as noted Answered
EC A 10/10/2022 10/9/2022 B - Approved as noted Answered
CO S 10/17/2022 10/16/2022 B - Approved as noted Answered
SM S 10/17/2022 10/16/2022 B - Approved as noted Answered
SM S 10/17/2022 10/16/2022 B - Approved as noted Answered
SM S 10/20/2022 10/16/2022 B - Approved as noted Answered
SM S 10/17/2022 10/16/2022 B - Approved as noted Answered
CO S 10/17/2022 10/16/2022 B - Approved as noted Answered
CO S 10/17/2022 10/16/2022 B - Approved as noted Answered
CO S 10/17/2022 10/16/2022 B - Approved as noted Answered
CO S 10/17/2022 10/16/2022 B - Approved as noted Answered
CO S 10/17/2022 10/16/2022 B - Approved as noted Answered
CO S 10/17/2022 10/16/2022 B - Approved as noted Answered
CO S 10/17/2022 10/16/2022 B - Approved as noted Answered
CO S 10/17/2022 10/16/2022 B - Approved as noted Answered
CO S 10/17/2022 10/16/2022 B - Approved as noted Answered
CO S 10/17/2022 10/16/2022 B - Approved as noted Answered
CO S 10/17/2022 10/16/2022 B - Approved as noted Answered
CO S 10/17/2022 10/16/2022 B - Approved as noted Answered
CO S 10/17/2022 10/16/2022 B - Approved as noted Answered
CO S 10/17/2022 10/16/2022 B - Approved as noted Answered
CO C 10/18/2022 10/16/2022 B - Approved as noted Answered
CO S 10/17/2022 10/16/2022 B - Approved as noted Answered
LM S 10/17/2022 10/16/2022 B - Approved as noted Answered
CO S 10/17/2022 10/16/2022 B - Approved as noted Answered
CO S 10/17/2022 10/16/2022 B - Approved as noted Answered
CO S 10/17/2022 10/16/2022 B - Approved as noted Answered
CO S 10/17/2022 10/16/2022 B - Approved as noted Answered
CO S 10/17/2022 10/16/2022 B - Approved as noted Answered
CO S 10/17/2022 10/16/2022 B - Approved as noted Answered
EC S 10/20/2022 10/16/2022 B - Approved as noted Answered
CO C 10/16/2022 10/15/2022 B - Approved as noted Answered
CO SU 10/16/2022 10/15/2022 B - Approved as noted Answered
CO SU 10/16/2022 10/15/2022 B - Approved as noted Answered
CO SU 10/16/2022 10/15/2022 B - Approved as noted Answered
CO SU 10/16/2022 10/15/2022 B - Approved as noted Answered
SM SU 10/16/2022 10/15/2022 B - Approved as noted Answered
SM SU 10/16/2022 10/15/2022 B - Approved as noted Answered
EC SU 10/16/2022 10/15/2022 B - Approved as noted Answered
MC SU 9/15/2022 9/14/2022 B - Approved as noted Answered
CO S 10/16/2022 10/15/2022 B - Approved as noted Answered
CO S 10/16/2022 10/15/2022 B - Approved as noted Answered
CO S 10/16/2022 10/15/2022 B - Approved as noted Answered
CF S 10/16/2022 10/17/2022 B - Approved as noted Answered
CO S 10/16/2022 10/15/2022 B - Approved as noted Answered
CO S 10/16/2022 10/15/2022 B - Approved as noted Answered
CO S 10/16/2022 10/15/2022 B - Approved as noted Answered
CO S 10/16/2022 10/15/2022 B - Approved as noted Answered
CO S 10/16/2022 10/15/2022 B - Approved as noted Answered
CO S 10/16/2022 10/15/2022 B - Approved as noted Answered
SM S 10/16/2022 10/15/2022 B - Approved as noted Answered
SM S 10/16/2022 10/15/2022 B - Approved as noted Answered
SM S 10/16/2022 10/15/2022 B - Approved as noted Answered
SM S 10/16/2022 10/15/2022 B - Approved as noted Answered
CO S 10/16/2022 10/15/2022 B - Approved as noted Answered
TG LS 10/17/2022 10/16/2022 B - Approved as noted Answered
EC S 10/16/2022 10/15/2022 B - Approved as noted Answered
CO S 10/5/2022 10/4/2022 B - Approved as noted Answered
MC C 10/16/2022 10/15/2022 B - Approved as noted Answered
TG C 10/17/2022 10/16/2022 B - Approved as noted Answered
MB A 10/17/2022 10/16/2022 B - Approved as noted Answered
MB A 10/17/2022 10/16/2022 B - Approved as noted Answered
MB A 10/17/2022 10/16/2022 B - Approved as noted Answered
AG A 10/16/2022 10/15/2022 B - Approved as noted Answered
PG C 10/16/2022 10/15/2022 B - Approved as noted Answered
SG C 10/16/2022 10/15/2022 B - Approved as noted Answered
WG C 10/16/2022 10/15/2022 B - Approved as noted Answered
WG C 10/16/2022 10/15/2022 B - Approved as noted Answered
WG C 10/16/2022 10/15/2022 B - Approved as noted Answered
PG SU 10/16/2022 10/15/2022 B - Approved as noted Answered
PG SU 10/16/2022 10/15/2022 B - Approved as noted Answered
PG S 10/16/2022 10/15/2022 B - Approved as noted Answered
MC S 10/15/2022 10/13/2022 B - Approved as noted Answered
MC S 10/15/2022 10/13/2022 B - Approved as noted Answered
CF S 10/15/2022 10/13/2022 B - Approved as noted Answered
CF S 10/15/2022 10/13/2022 B - Approved as noted Answered
CF S 10/15/2022 10/13/2022 B - Approved as noted Answered
CF SU 10/15/2022 10/13/2022 B - Approved as noted Answered
SW C 10/15/2022 10/13/2022 B - Approved as noted Answered
SW C 10/16/2022 10/15/2022 B - Approved as noted Answered
SW C 10/16/2022 10/15/2022 B - Approved as noted Answered
SW C 10/16/2022 10/15/2022 B - Approved as noted Answered
SW C 10/16/2022 10/15/2022 B - Approved as noted Answered
SW C 10/16/2022 10/15/2022 B - Approved as noted Answered
SW C 10/16/2022 10/15/2022 B - Approved as noted Answered
SW C 10/16/2022 10/15/2022 B - Approved as noted Answered
SW C 10/16/2022 10/15/2022 B - Approved as noted Answered
SW C 10/16/2022 10/15/2022 B - Approved as noted Answered
SW C 10/16/2022 10/15/2022 B - Approved as noted Answered
SW LS 10/22/2022 10/15/2022 B - Approved as noted Answered
SW LS 10/22/2022 10/15/2022 B - Approved as noted Answered
SW C 10/15/2022 10/13/2022 B - Approved as noted Answered
SW C 10/15/2022 10/13/2022 B - Approved as noted Answered
SW C 10/15/2022 10/13/2022 B - Approved as noted Answered
SW C 10/15/2022 10/13/2022 B - Approved as noted Answered
SW C 10/15/2022 10/13/2022 B - Approved as noted Answered
SW C 10/15/2022 10/13/2022 B - Approved as noted Answered
SW C 10/18/2022 10/13/2022 B - Approved as noted Answered
SW C 10/15/2022 10/13/2022 B - Approved as noted Answered
SW C 10/18/2022 10/13/2022 B - Approved as noted Answered
SW C 10/15/2022 10/13/2022 B - Approved as noted Answered
SW C 10/15/2022 10/13/2022 B - Approved as noted Answered
SW C 10/15/2022 10/13/2022 B - Approved as noted Answered
SW C 10/15/2022 10/13/2022 B - Approved as noted Answered
SW C 10/15/2022 10/13/2022 B - Approved as noted Answered
PA C 10/15/2022 10/13/2022 B - Approved as noted Answered
PA C 10/15/2022 10/13/2022 B - Approved as noted Answered
SW C 10/15/2022 10/13/2022 B - Approved as noted Answered
PA LS 10/15/2022 10/13/2022 B - Approved as noted Answered
PA LS 10/18/2022 10/13/2022 B - Approved as noted Answered
SW C 10/15/2022 10/13/2022 B - Approved as noted Answered
SW C 10/13/2022 10/12/2022 B - Approved as noted Answered
SW C 10/13/2022 10/12/2022 B - Approved as noted Answered
SW C 10/13/2022 10/12/2022 B - Approved as noted Answered
SW C 10/13/2022 10/12/2022 B - Approved as noted Answered
SW C 10/13/2022 10/12/2022 B - Approved as noted Answered
SW C 10/13/2022 10/12/2022 B - Approved as noted Answered
SW C 10/13/2022 10/12/2022 B - Approved as noted Answered
SW C 10/13/2022 10/12/2022 B - Approved as noted Answered
SW C 10/13/2022 10/12/2022 B - Approved as noted Answered
SW LS 10/22/2022 10/12/2022 B - Approved as noted Answered
PA LS 10/18/2022 10/12/2022 B - Approved as noted Answered
SW C 10/13/2022 10/12/2022 B - Approved as noted Answered
PC LC 10/15/2022 10/13/2022 B - Approved as noted Answered
PC LC 10/15/2022 10/13/2022 B - Approved as noted Answered
CO A 10/15/2022 10/13/2022 B - Approved as noted Answered
CO A 10/15/2022 10/13/2022 B - Approved as noted Answered
CO A 10/15/2022 10/13/2022 B - Approved as noted Answered
CO A 10/15/2022 10/13/2022 B - Approved as noted Answered
CO A 10/15/2022 10/13/2022 B - Approved as noted Answered
CO A 10/15/2022 10/13/2022 B - Approved as noted Answered
CO A 10/10/2022 10/9/2022 B - Approved as noted Answered
CO A 10/10/2022 10/9/2022 B - Approved as noted Answered
CO S 10/15/2022 10/13/2022 B - Approved as noted Answered
CO S 10/15/2022 10/13/2022 B - Approved as noted Answered
MC S 10/15/2022 10/13/2022 B - Approved as noted Answered
MC S 10/15/2022 10/13/2022 B - Approved as noted Answered
CF S 10/15/2022 10/13/2022 B - Approved as noted Answered
LM S 10/15/2022 10/13/2022 B - Approved as noted Answered
MB LC 10/13/2022 11/12/2022 B - Approved as noted Answered
WG S 10/15/2022 10/13/2022 B - Approved as noted Answered
MB A 10/15/2022 10/13/2022 B - Approved as noted Answered
SW LC 10/13/2022 11/12/2022 B - Approved as noted Answered
MB LC 10/13/2022 11/12/2022 B - Approved as noted Answered
SW LC 10/11/2022 11/11/2022 B - Approved as noted Answered
SW LC 10/13/2022 11/12/2022 B - Approved as noted Answered
PG SU 10/13/2022 10/12/2022 B - Approved as noted Answered
TB SU 10/13/2022 10/12/2022 B - Approved as noted Answered
WG C 10/13/2022 10/12/2022 B - Approved as noted Answered
WG C 10/13/2022 10/12/2022 B - Approved as noted Answered
WG C 10/13/2022 10/12/2022 B - Approved as noted Answered
PG S 10/13/2022 10/12/2022 B - Approved as noted Answered
TB S 10/13/2022 10/12/2022 B - Approved as noted Answered
WG S 10/13/2022 10/12/2022 B - Approved as noted Answered
WG S 10/13/2022 10/12/2022 B - Approved as noted Answered
SA S 10/6/2022 10/5/2022 B - Approved as noted Answered
CO C 10/13/2022 10/12/2022 B - Approved as noted Answered
LM S 10/13/2022 11/12/2022 B - Approved as noted Answered
CO S 10/13/2022 10/12/2022 B - Approved as noted Answered
CO A 10/6/2022 10/6/2022 B - Approved as noted Answered
PC S 10/13/2022 10/12/2022 B - Approved as noted Answered
CO A 10/6/2022 10/6/2022 B - Approved as noted Answered
CO A 10/6/2022 10/6/2022 B - Approved as noted Answered
CO A 10/6/2022 10/6/2022 B - Approved as noted Answered
CO S 10/13/2022 10/12/2022 B - Approved as noted Answered
CO A 10/6/2022 10/6/2022 B - Approved as noted Answered
CF S 10/13/2022 10/12/2022 B - Approved as noted Answered
CO A 10/6/2022 10/6/2022 B - Approved as noted Answered
CF S 10/13/2022 10/12/2022 B - Approved as noted Answered
CF SU 10/13/2022 10/12/2022 C - Revise & Resubmit Answered
CO S 10/13/2022 10/12/2022 B - Approved as noted Answered
CO S 10/13/2022 10/12/2022 B - Approved as noted Answered
CO SU 10/13/2022 11/12/2022 B - Approved as noted Answered
CO S 10/13/2022 10/12/2022 B - Approved as noted Answered
CO S 10/13/2022 10/15/2022 B - Approved as noted Answered
MC S 10/13/2022 10/12/2022 B - Approved as noted Answered
MC S 10/13/2022 10/12/2022 B - Approved as noted Answered
MC S 10/13/2022 10/12/2022 B - Approved as noted Answered
MC S 10/13/2022 10/12/2022 B - Approved as noted Answered
MC S 10/13/2022 10/12/2022 B - Approved as noted Answered
LM LC 10/13/2022 11/12/2022 B - Approved as noted Answered
CO S 10/13/2022 10/12/2022 B - Approved as noted Answered
LM LC 10/13/2022 11/12/2022 B - Approved as noted Answered
CO A 10/13/2022 10/12/2022 B - Approved as noted Answered
CO A 10/13/2022 10/12/2022 B - Approved as noted Answered
CO S 10/13/2022 10/12/2022 B - Approved as noted Answered
EC SU 10/13/2022 10/12/2022 B - Approved as noted Answered
EC SU 10/13/2022 10/12/2022 B - Approved as noted Answered
EC S 10/13/2022 10/12/2022 B - Approved as noted Answered
EC C 10/13/2022 10/12/2022 C - Revise & Resubmit Answered
CO S 10/10/2022 10/9/2022 B - Approved as noted Answered
CO SS 10/12/2022 11/11/2022 B - Approved as noted Answered
CO S 10/12/2022 10/11/2022 B - Approved as noted Answered
CO S 10/12/2022 10/11/2022 B - Approved as noted Answered
CO S 10/12/2022 10/11/2022 B - Approved as noted Answered
CO S 10/12/2022 10/11/2022 B - Approved as noted Answered
CO S 10/12/2022 10/11/2022 B - Approved as noted Answered
CO S 10/12/2022 10/11/2022 B - Approved as noted Answered
MC A 10/12/2022 10/11/2022 B - Approved as noted Answered
CO S 10/12/2022 10/11/2022 B - Approved as noted Answered
SW LS 10/13/2022 11/12/2022 B - Approved as noted Answered
CO SU 10/12/2022 11/10/2022 B - Approved as noted Answered
PC SU 10/12/2022 11/11/2022 B - Approved as noted Answered
SW M 10/13/2022 10/12/2022 B - Approved as noted Answered
PC SU 10/12/2022 11/11/2022 B - Approved as noted Answered
PG P 10/13/2022 10/12/2022 B - Approved as noted Answered
CO SU 10/12/2022 10/11/2022 B - Approved as noted Answered
CO SU 10/12/2022 11/11/2022 B - Approved as noted Answered
CO S 10/12/2022 11/11/2022 B - Approved as noted Answered
CO S 10/12/2022 10/11/2022 B - Approved as noted Answered
MC S 10/15/2022 10/13/2022 B - Approved as noted Answered
CO S 10/12/2022 10/11/2022 B - Approved as noted Answered
CO S 10/12/2022 10/11/2022 B - Approved as noted Answered
CO S 10/12/2022 10/11/2022 B - Approved as noted Answered
MC C 10/12/2022 10/11/2022 B - Approved as noted Answered
CO C 10/12/2022 10/11/2022 B - Approved as noted Answered
LM S 10/12/2022 10/11/2022 B - Approved as noted Answered
LM S 10/12/2022 10/11/2022 B - Approved as noted Answered
LM SU 10/12/2022 11/11/2022 B - Approved as noted Answered
CF S 10/12/2022 10/11/2022 B - Approved as noted Answered
CF S 10/12/2022 10/11/2022 B - Approved as noted Answered
CF SU 10/12/2022 10/11/2022 B - Approved as noted Answered
LM SU 10/12/2022 10/11/2022 B - Approved as noted Answered
CO S 10/11/2022 11/10/2022 B - Approved as noted Answered
CO S 10/11/2022 11/10/2022 B - Approved as noted Answered
CO SU 10/11/2022 10/10/2022 B - Approved as noted Answered
EC SU 10/11/2022 10/10/2022 B - Approved as noted Answered
EC S 10/16/2022 10/10/2022 B - Approved as noted Answered
SA S 10/11/2022 11/10/2022 B - Approved as noted Answered
SA S 10/11/2022 10/10/2022 B - Approved as noted Answered
SA SU 10/11/2022 10/10/2022 B - Approved as noted Answered
SA S 10/11/2022 11/10/2022 B - Approved as noted Answered
EC S 10/11/2022 10/10/2022 B - Approved as noted Answered
EC SU 10/11/2022 10/10/2022 B - Approved as noted Answered
SM S 10/11/2022 10/10/2022 B - Approved as noted Answered
MC C 10/11/2022 10/10/2022 B - Approved as noted Answered
CO C 10/11/2022 10/10/2022 B - Approved as noted Answered
VG S 10/11/2022 11/10/2022 B - Approved as noted Answered
VG SU 10/11/2022 10/10/2022 B - Approved as noted Answered
MB LC 10/12/2022 10/11/2022 B - Approved as noted Answered
SW C 10/15/2022 10/11/2022 B - Approved as noted Answered
SW C 10/12/2022 11/11/2022 B - Approved as noted Answered
SW C 10/16/2022 10/11/2022 B - Approved as noted Answered
SW C 10/15/2022 10/11/2022 B - Approved as noted Answered
SW C 10/12/2022 10/11/2022 B - Approved as noted Answered
SW C 10/12/2022 10/11/2022 B - Approved as noted Answered
SW C 10/12/2022 10/11/2022 B - Approved as noted Answered
SW C 10/12/2022 10/11/2022 B - Approved as noted Answered
SW C 10/12/2022 10/11/2022 B - Approved as noted Answered
SW C 10/12/2022 10/11/2022 B - Approved as noted Answered
SW C 10/12/2022 10/11/2022 B - Approved as noted Answered
SW C 10/12/2022 10/11/2022 B - Approved as noted Answered
SW C 10/12/2022 10/11/2022 B - Approved as noted Answered
SW C 10/11/2022 11/10/2022 B - Approved as noted Answered
SW E 10/12/2022 10/11/2022 C - Revise & Resubmit Answered
SW M 10/12/2022 10/11/2022 B - Approved as noted Answered
LM P 10/12/2022 10/12/2022 B - Approved as noted Answered
SW P 10/15/2022 10/11/2022 B - Approved as noted Answered
CF P 10/12/2022 11/11/2022 B - Approved as noted Answered
PA LS 10/12/2022 10/11/2022 B - Approved as noted Answered
SW LS 10/22/2022 10/10/2022 B - Approved as noted Answered
SW LS 10/11/2022 10/10/2022 B - Approved as noted Answered
SW LS 10/22/2022 10/10/2022 B - Approved as noted Answered
SW LS 10/22/2022 10/10/2022 B - Approved as noted Answered
SW LS 10/22/2022 10/10/2022 B - Approved as noted Answered
PG LS 10/22/2022 10/11/2022 C - Revise & Resubmit Answered
SW C 10/11/2022 10/10/2022 B - Approved as noted Answered
PG LS 10/12/2022 10/11/2022 C - Revise & Resubmit Answered
SW C 10/18/2022 10/10/2022 B - Approved as noted Answered
DG LS 10/19/2022 10/11/2022 B - Approved as noted Answered
SW C 10/11/2022 10/10/2022 B - Approved as noted Answered
TG SS 10/12/2022 10/11/2022 C - Revise & Resubmit Answered
SW C 10/11/2022 10/10/2022 B - Approved as noted Answered
SW C 10/11/2022 10/11/2022 B - Approved as noted Answered
PG S 10/15/2022 10/11/2022 B - Approved as noted Answered
SW C 10/11/2022 10/10/2022 B - Approved as noted Answered
TB S 10/12/2022 10/11/2022 B - Approved as noted Answered
SW C 10/11/2022 10/10/2022 B - Approved as noted Answered
WG S 10/12/2022 10/11/2022 B - Approved as noted Answered
SW C 10/12/2022 10/10/2022 B - Approved as noted Answered
TG C 10/12/2022 10/11/2022 C - Revise & Resubmit Answered
SW C 10/11/2022 10/10/2022 B - Approved as noted Answered
SW C 10/11/2022 10/11/2022 B - Approved as noted Answered
SW C 10/11/2022 11/10/2022 B - Approved as noted Answered
SW C 10/11/2022 10/10/2022 B - Approved as noted Answered
SW C 10/11/2022 10/10/2022 B - Approved as noted Answered
LM LC 10/11/2022 10/10/2022 B - Approved as noted Answered
LM E 10/11/2022 10/10/2022 B - Approved as noted Answered
CO S 10/11/2022 10/10/2022 B - Approved as noted Answered
CO S 10/11/2022 10/10/2022 B - Approved as noted Answered
CO SU 10/11/2022 10/10/2022 B - Approved as noted Answered
CO S 10/11/2022 10/10/2022 B - Approved as noted Answered
CO A 10/11/2022 10/10/2022 B - Approved as noted Answered
CO A 10/11/2022 10/10/2022 B - Approved as noted Answered
MC A 10/11/2022 10/10/2022 B - Approved as noted Answered
VG S 10/11/2022 10/10/2022 B - Approved as noted Answered
CO S 10/11/2022 10/10/2022 B - Approved as noted Answered
CO S 10/11/2022 10/10/2022 B - Approved as noted Answered
DG LS 10/11/2022 10/10/2022 B - Approved as noted Answered
PG S 10/11/2022 10/10/2022 B - Approved as noted Answered
WG C 10/15/2022 10/10/2022 B - Approved as noted Answered
WG C 10/11/2022 10/10/2022 B - Approved as noted Answered
ZG C 10/11/2022 10/10/2022 B - Approved as noted Answered
WG C 10/11/2022 10/10/2022 B - Approved as noted Answered
WG C 10/11/2022 10/10/2022 B - Approved as noted Answered
SW C 10/10/2022 10/9/2022 B - Approved as noted Answered
SW C 10/10/2022 10/9/2022 B - Approved as noted Answered
SW C 10/6/2022 10/8/2022 B - Approved as noted Answered
SW LS 10/10/2022 10/9/2022 B - Approved as noted Answered
SW C 10/10/2022 10/9/2022 B - Approved as noted Answered
SW C 10/10/2022 10/9/2022 B - Approved as noted Answered
SW C 10/10/2022 10/10/2022 B - Approved as noted Answered
SW C 10/10/2022 11/9/2022 B - Approved as noted Answered
SW C 10/10/2022 10/9/2022 B - Approved as noted Answered
SW C 10/10/2022 10/9/2022 B - Approved as noted Answered
SW C 10/10/2022 10/9/2022 B - Approved as noted Answered
SW C 10/10/2022 10/9/2022 B - Approved as noted Answered
SW C 10/10/2022 10/9/2022 B - Approved as noted Answered
SW C 10/10/2022 10/9/2022 B - Approved as noted Answered
SW C 10/10/2022 10/9/2022 B - Approved as noted Answered
SW C 10/10/2022 10/9/2022 B - Approved as noted Answered
SW C 10/10/2022 10/9/2022 B - Approved as noted Answered
SW C 10/10/2022 10/9/2022 B - Approved as noted Answered
SW C 10/10/2022 10/9/2022 B - Approved as noted Answered
PG S 10/10/2022 10/9/2022 B - Approved as noted Answered
WG S 10/10/2022 10/11/2022 B - Approved as noted Answered
SW LS 10/9/2022 10/8/2022 B - Approved as noted Answered
WG S 10/10/2022 10/9/2022 B - Approved as noted Answered
WG C 10/10/2022 10/11/2022 B - Approved as noted Answered
SW C 10/9/2022 10/8/2022 B - Approved as noted Answered
SW C 10/9/2022 10/10/2022 B - Approved as noted Answered
SG C 10/10/2022 11/9/2022 B - Approved as noted Answered
SW C 10/9/2022 10/10/2022 B - Approved as noted Answered
SW C 10/9/2022 10/10/2022 B - Approved as noted Answered
PA C 10/9/2022 10/10/2022 B - Approved as noted Answered
SW C 10/9/2022 10/8/2022 B - Approved as noted Answered
ZG C 10/10/2022 10/10/2022 B - Approved as noted Answered
SW C 10/10/2022 10/8/2022 B - Approved as noted Answered
WG C 10/10/2022 11/9/2022 B - Approved as noted Answered
WG C 10/10/2022 10/9/2022 B - Approved as noted Answered
WG C 10/10/2022 10/11/2022 B - Approved as noted Answered
SW C 10/10/2022 10/11/2022 B - Approved as noted Answered
WG C 10/10/2022 10/9/2022 B - Approved as noted Answered
SW LS 9/6/2022 9/5/2022 A - Approved Answered
WG LC 10/11/2022 10/10/2022 B - Approved as noted Answered
WG LC 10/11/2022 10/10/2022 B - Approved as noted Answered
CO SS 10/10/2022 10/9/2022 B - Approved as noted Answered
EC S 10/10/2022 10/9/2022 B - Approved as noted Answered
CO S 10/10/2022 10/9/2022 B - Approved as noted Answered
CO S 10/10/2022 10/9/2022 B - Approved as noted Answered
CO S 10/10/2022 10/9/2022 B - Approved as noted Answered
CO S 10/10/2022 10/9/2022 B - Approved as noted Answered
CO A 10/10/2022 10/9/2022 B - Approved as noted Answered
CO A 10/10/2022 10/9/2022 B - Approved as noted Answered
CO S 10/10/2022 10/9/2022 B - Approved as noted Answered
CO SU 10/10/2022 10/9/2022 B - Approved as noted Answered
CF S 10/10/2022 10/9/2022 B - Approved as noted Answered
CF S 10/10/2022 10/9/2022 B - Approved as noted Answered
CF SU 10/10/2022 10/9/2022 B - Approved as noted Answered
CO C 10/10/2022 10/9/2022 B - Approved as noted Answered
VG C 10/10/2022 10/9/2022 B - Approved as noted Answered
CO SU 10/10/2022 10/9/2022 B - Approved as noted Answered
CO A 10/10/2022 10/9/2022 C - Revise & Resubmit Answered
EC A 10/10/2022 10/9/2022 B - Approved as noted Answered
CO S 10/10/2022 10/9/2022 B - Approved as noted Answered
CO S 10/10/2022 10/9/2022 B - Approved as noted Answered
CO S 10/10/2022 10/9/2022 B - Approved as noted Answered
CO S 10/10/2022 10/9/2022 B - Approved as noted Answered
RG C 10/10/2022 10/9/2022 B - Approved as noted Answered
CO S 10/10/2022 10/12/2022 B - Approved as noted Answered
CO C 10/10/2022 10/9/2022 B - Approved as noted Answered
CO S 10/10/2022 10/9/2022 B - Approved as noted Answered
MC C 10/10/2022 10/9/2022 B - Approved as noted Answered
CO S 10/10/2022 10/9/2022 B - Approved as noted Answered
LM S 10/10/2022 10/9/2022 B - Approved as noted Answered
CO S 10/10/2022 10/9/2022 B - Approved as noted Answered
LM S 10/13/2022 10/9/2022 B - Approved as noted Answered
CO SU 10/10/2022 10/9/2022 B - Approved as noted Answered
LM SU 10/10/2022 10/9/2022 B - Approved as noted Answered
CO S 10/9/2022 10/8/2022 B - Approved as noted Answered
SM S 10/9/2022 10/8/2022 B - Approved as noted Answered
CO S 10/9/2022 10/8/2022 B - Approved as noted Answered
CO S 10/9/2022 10/8/2022 B - Approved as noted Answered
CO S 10/9/2022 10/8/2022 B - Approved as noted Answered
CO SU 10/9/2022 10/8/2022 B - Approved as noted Answered
CO SS 10/9/2022 10/8/2022 B - Approved as noted Answered
MC A 10/9/2022 10/8/2022 B - Approved as noted Answered
MC S 10/12/2022 10/8/2022 B - Approved as noted Answered
MC S 10/12/2022 10/8/2022 B - Approved as noted Answered
MC SU 10/9/2022 10/8/2022 B - Approved as noted Answered
CO S 10/9/2022 10/8/2022 B - Approved as noted Answered
CO SU 10/9/2022 10/8/2022 B - Approved as noted Answered
MC A 10/9/2022 10/8/2022 B - Approved as noted Answered
CO S 10/9/2022 10/6/2022 B - Approved as noted Answered
CO SU 10/9/2022 10/8/2022 B - Approved as noted Answered
CF LC 10/10/2022 10/9/2022 B - Approved as noted Answered
AG LC 10/10/2022 10/9/2022 B - Approved as noted Answered
AG LC 10/10/2022 10/9/2022 B - Approved as noted Answered
AG LC 10/10/2022 10/9/2022 B - Approved as noted Answered
MB LC 10/10/2022 10/9/2022 B - Approved as noted Answered
SW C 10/10/2022 10/9/2022 B - Approved as noted Answered
SW C 10/10/2022 10/10/2022 B - Approved as noted Answered
AG E 10/10/2022 10/9/2022 B - Approved as noted Answered
CO S 10/9/2022 10/8/2022 B - Approved as noted Answered
NA P 10/10/2022 10/9/2022 B - Approved as noted Answered
CO S 10/9/2022 10/8/2022 B - Approved as noted Answered
CO SU 10/9/2022 10/8/2022 B - Approved as noted Answered
MB E 10/9/2022 10/8/2022 B - Approved as noted Answered
EC SU 10/9/2022 10/8/2022 B - Approved as noted Answered
EC S 10/9/2022 10/8/2022 B - Approved as noted Answered
TT E 10/13/2022 10/12/2022 B - Approved as noted Answered
CO S 10/8/2022 10/6/2022 B - Approved as noted Answered
EC S 10/8/2022 10/6/2022 B - Approved as noted Answered
EC C 10/8/2022 10/10/2022 B - Approved as noted Answered
EC S 10/8/2022 10/6/2022 B - Approved as noted Answered
CO SU 10/8/2022 10/6/2022 B - Approved as noted Answered
MC S 10/8/2022 10/6/2022 B - Approved as noted Answered
MC S 10/8/2022 10/6/2022 B - Approved as noted Answered
CO C 10/8/2022 10/10/2022 B - Approved as noted Answered
RG C 10/8/2022 10/8/2022 B - Approved as noted Answered
CO S 10/8/2022 10/6/2022 B - Approved as noted Answered
MC S 10/8/2022 10/6/2022 B - Approved as noted Answered
SA S 10/8/2022 10/6/2022 B - Approved as noted Answered
MC SU 10/8/2022 10/6/2022 B - Approved as noted Answered
RG C 10/8/2022 10/10/2022 B - Approved as noted Answered
CO C 10/8/2022 10/10/2022 B - Approved as noted Answered
MC S 10/8/2022 10/6/2022 B - Approved as noted Answered
CO SU 10/8/2022 10/6/2022 B - Approved as noted Answered
CO S 10/8/2022 10/6/2022 B - Approved as noted Answered
CO S 10/8/2022 10/6/2022 B - Approved as noted Answered
JG C 10/8/2022 10/8/2022 B - Approved as noted Answered
SW C 10/10/2022 10/11/2022 B - Approved as noted Answered
SW C 10/10/2022 10/9/2022 B - Approved as noted Answered
SA S 10/6/2022 10/5/2022 B - Approved as noted Answered
SW M 10/8/2022 10/6/2022 B - Approved as noted Answered
SW C 10/8/2022 10/10/2022 B - Approved as noted Answered
SW C 10/8/2022 10/10/2022 B - Approved as noted Answered
SW LS 10/8/2022 10/6/2022 B - Approved as noted Answered
PA LS 10/8/2022 10/6/2022 B - Approved as noted Answered
PA LS 10/8/2022 10/6/2022 B - Approved as noted Answered
SW LS 10/8/2022 10/6/2022 B - Approved as noted Answered
SW C 10/8/2022 10/10/2022 B - Approved as noted Answered
SW C 10/8/2022 10/10/2022 B - Approved as noted Answered
SW C 10/8/2022 10/10/2022 B - Approved as noted Answered
SW C 10/8/2022 10/10/2022 B - Approved as noted Answered
SW C 10/8/2022 10/10/2022 B - Approved as noted Answered
SW C 10/8/2022 10/10/2022 B - Approved as noted Answered
SW C 10/8/2022 10/8/2022 B - Approved as noted Answered
SW C 10/8/2022 10/10/2022 B - Approved as noted Answered
SW C 10/8/2022 10/10/2022 B - Approved as noted Answered
EC S 10/6/2022 10/5/2022 B - Approved as noted Answered
SW C 10/8/2022 10/8/2022 B - Approved as noted Answered
SW C 10/8/2022 10/8/2022 B - Approved as noted Answered
EC SU 10/6/2022 10/5/2022 B - Approved as noted Answered
SW C 10/8/2022 10/10/2022 B - Approved as noted Answered
EC S 10/6/2022 10/5/2022 B - Approved as noted Answered
SW C 10/8/2022 10/8/2022 B - Approved as noted Answered
MC S 10/6/2022 10/5/2022 B - Approved as noted Answered
SW C 10/8/2022 10/9/2022 B - Approved as noted Answered
EC SU 10/6/2022 10/5/2022 B - Approved as noted Answered
SW C 10/6/2022 10/8/2022 B - Approved as noted Answered
VG C 10/6/2022 10/10/2022 B - Approved as noted Answered
SW C 10/6/2022 10/8/2022 B - Approved as noted Answered
SW C 10/6/2022 10/8/2022 B - Approved as noted Answered
SW C 10/6/2022 10/8/2022 B - Approved as noted Answered
CO C 10/6/2022 10/10/2022 B - Approved as noted Answered
SW C 10/6/2022 10/10/2022 B - Approved as noted Answered
SW C 10/6/2022 10/8/2022 B - Approved as noted Answered
SW C 10/6/2022 10/10/2022 B - Approved as noted Answered
SW C 10/6/2022 10/8/2022 B - Approved as noted Answered
SW C 10/6/2022 10/8/2022 B - Approved as noted Answered
SW C 10/6/2022 10/8/2022 B - Approved as noted Answered
SA SU 10/6/2022 10/5/2022 B - Approved as noted Answered
SW C 10/6/2022 10/6/2022 B - Approved as noted Answered
SW C 10/6/2022 10/8/2022 C - Revise & Resubmit Answered
CO S 10/6/2022 10/5/2022 B - Approved as noted Answered
SW C 10/6/2022 10/8/2022 B - Approved as noted Answered
SW C 10/6/2022 10/10/2022 B - Approved as noted Answered
CO S 10/6/2022 10/5/2022 B - Approved as noted Answered
SW C 10/6/2022 10/10/2022 B - Approved as noted Answered
CO S 10/6/2022 10/5/2022 B - Approved as noted Answered
SW C 10/6/2022 10/8/2022 B - Approved as noted Answered
CO S 10/6/2022 10/5/2022 B - Approved as noted Answered
CO S 10/6/2022 10/5/2022 B - Approved as noted Answered
PA LS 10/6/2022 10/5/2022 B - Approved as noted Answered
NR S 10/10/2022 10/5/2022 B - Approved as noted Answered
NR S 10/6/2022 10/5/2022 B - Approved as noted Answered
CO S 10/6/2022 10/5/2022 B - Approved as noted Answered
CO SU 10/5/2022 10/4/2022 B - Approved as noted Answered
CO S 10/5/2022 10/4/2022 B - Approved as noted Answered
VG S 10/5/2022 10/4/2022 B - Approved as noted Answered
CO S 10/5/2022 10/4/2022 B - Approved as noted Answered
CO SU 10/5/2022 10/4/2022 B - Approved as noted Answered
SM SU 10/5/2022 10/4/2022 B - Approved as noted Answered
MC S 10/5/2022 10/4/2022 B - Approved as noted Answered
PG SU 10/9/2022 10/8/2022 B - Approved as noted Answered
TG C 10/9/2022 10/8/2022 B - Approved as noted Answered
WG C 10/9/2022 10/8/2022 B - Approved as noted Answered
PG C 10/9/2022 10/10/2022 B - Approved as noted Answered
CO S 10/5/2022 10/4/2022 B - Approved as noted Answered
CO S 10/5/2022 10/4/2022 B - Approved as noted Answered
CO A 10/5/2022 10/4/2022 B - Approved as noted Answered
MC S 10/5/2022 10/4/2022 B - Approved as noted Answered
MC SU 10/5/2022 10/4/2022 B - Approved as noted Answered
SM S 10/5/2022 10/4/2022 B - Approved as noted Answered
CO C 10/5/2022 10/8/2022 B - Approved as noted Answered
CO S 10/5/2022 10/4/2022 B - Approved as noted Answered
CO S 10/5/2022 10/4/2022 B - Approved as noted Answered
CO C 10/5/2022 10/8/2022 B - Approved as noted Answered
DG LS 10/8/2022 10/6/2022 B - Approved as noted Answered
WG LS 10/8/2022 10/6/2022 B - Approved as noted Answered
WG LS 10/11/2022 10/6/2022 B - Approved as noted Answered
SW C 10/8/2022 10/9/2022 B - Approved as noted Answered
SW C 10/8/2022 10/10/2022 B - Approved as noted Answered
WG C 10/8/2022 10/10/2022 B - Approved as noted Answered
WG C 10/8/2022 10/10/2022 B - Approved as noted Answered
TB S 10/8/2022 10/6/2022 B - Approved as noted Answered
SW S 10/8/2022 10/6/2022 B - Approved as noted Answered
MB A 10/8/2022 10/6/2022 B - Approved as noted Answered
AG A 10/8/2022 10/16/2022 B - Approved as noted Answered
MB A 10/8/2022 10/6/2022 B - Approved as noted Answered
WG C 10/6/2022 10/10/2022 B - Approved as noted Answered
DG LS 10/10/2022 10/5/2022 B - Approved as noted Answered
DG LS 10/10/2022 10/5/2022 B - Approved as noted Answered
TG LS 10/10/2022 10/5/2022 B - Approved as noted Answered
MB A 10/6/2022 10/5/2022 B - Approved as noted Answered
WG S 10/6/2022 10/5/2022 B - Approved as noted Answered
WG E 10/5/2022 10/4/2022 B - Approved as noted Answered
TB E 10/6/2022 10/5/2022 B - Approved as noted Answered
PC E 10/6/2022 10/5/2022 B - Approved as noted Answered
TB LC 10/6/2022 10/5/2022 B - Approved as noted Answered
NR P 10/6/2022 10/5/2022 B - Approved as noted Answered
SW M 10/6/2022 10/5/2022 B - Approved as noted Answered
TB SU 10/5/2022 10/4/2022 B - Approved as noted Answered
WG SU 10/5/2022 10/4/2022 B - Approved as noted Answered
WG S 10/5/2022 10/4/2022 B - Approved as noted Answered
WG S 10/5/2022 10/4/2022 B - Approved as noted Answered
WG S 10/6/2022 10/4/2022 B - Approved as noted Answered
WG S 10/5/2022 10/4/2022 C - Revise & Resubmit Answered
WG S 10/5/2022 10/4/2022 B - Approved as noted Answered
WG C 10/5/2022 10/4/2022 B - Approved as noted Answered
WG C 10/5/2022 10/4/2022 B - Approved as noted Answered
PG C 10/5/2022 10/8/2022 B - Approved as noted Answered
TB E 10/5/2022 10/4/2022 B - Approved as noted Answered
SW C 9/19/2022 9/18/2022 B - Approved as noted Answered
CO A 10/5/2022 10/4/2022 B - Approved as noted Answered
CO A 10/5/2022 10/4/2022 B - Approved as noted Answered
MC S 10/5/2022 10/4/2022 B - Approved as noted Answered
MC S 10/5/2022 10/4/2022 B - Approved as noted Answered
LM A 10/5/2022 10/4/2022 B - Approved as noted Answered
LM SU 10/5/2022 10/4/2022 B - Approved as noted Answered
CO C 10/5/2022 10/8/2022 B - Approved as noted Answered
RG C 10/5/2022 10/8/2022 B - Approved as noted Answered
CO SU 10/5/2022 10/4/2022 B - Approved as noted Answered
CO S 10/5/2022 10/4/2022 B - Approved as noted Answered
CO S 10/5/2022 10/4/2022 B - Approved as noted Answered
CO S 10/5/2022 10/4/2022 B - Approved as noted Answered
LM A 10/5/2022 10/4/2022 B - Approved as noted Answered
CO S 10/5/2022 10/4/2022 B - Approved as noted Answered
CO S 10/5/2022 10/4/2022 B - Approved as noted Answered
CO S 10/5/2022 10/4/2022 B - Approved as noted Answered
PA LS 10/5/2022 10/4/2022 B - Approved as noted Answered
SW LS 10/5/2022 10/4/2022 B - Approved as noted Answered
SW LS 10/5/2022 10/4/2022 B - Approved as noted Answered
SW LS 10/5/2022 10/4/2022 B - Approved as noted Answered
SW LS 10/5/2022 10/4/2022 B - Approved as noted Answered
SW C 10/5/2022 10/8/2022 B - Approved as noted Answered
SW C 10/5/2022 10/8/2022 B - Approved as noted Answered
SW C 10/5/2022 10/6/2022 B - Approved as noted Answered
SW C 10/5/2022 10/8/2022 B - Approved as noted Answered
SW C 10/5/2022 10/8/2022 B - Approved as noted Answered
SW C 10/5/2022 10/6/2022 B - Approved as noted Answered
SW C 10/5/2022 10/8/2022 B - Approved as noted Answered
SW C 10/5/2022 10/8/2022 B - Approved as noted Answered
SW C 10/5/2022 10/8/2022 B - Approved as noted Answered
SW C 10/5/2022 10/8/2022 B - Approved as noted Answered
SW C 10/5/2022 10/8/2022 B - Approved as noted Answered
SW C 10/5/2022 10/6/2022 B - Approved as noted Answered
SW C 10/5/2022 10/6/2022 B - Approved as noted Answered
SW C 10/5/2022 10/8/2022 B - Approved as noted Answered
SW C 10/5/2022 10/8/2022 B - Approved as noted Answered
SW C 10/5/2022 10/8/2022 B - Approved as noted Answered
WG C 10/5/2022 10/8/2022 B - Approved as noted Answered
ZG C 10/5/2022 10/8/2022 B - Approved as noted Answered
PG C 10/4/2022 10/6/2022 B - Approved as noted Answered
DG LS 10/10/2022 10/3/2022 B - Approved as noted Answered
DG LS 10/10/2022 10/3/2022 B - Approved as noted Answered
DG LS 10/10/2022 10/3/2022 B - Approved as noted Answered
DG LS 10/10/2022 10/3/2022 B - Approved as noted Answered
PT A 10/4/2022 10/3/2022 B - Approved as noted Answered
FC S 10/4/2022 10/3/2022 B - Approved as noted Answered
MB S 10/4/2022 10/3/2022 B - Approved as noted Answered
TB S 10/4/2022 10/3/2022 B - Approved as noted Answered
SM E 10/4/2022 10/3/2022 C - Revise & Resubmit Answered
PC LC 10/3/2022 10/3/2022 B - Approved as noted Answered
PC LC 10/3/2022 10/2/2022 B - Approved as noted Answered
CO A 10/3/2022 10/2/2022 B - Approved as noted Answered
CO A 10/3/2022 10/2/2022 B - Approved as noted Answered
CO A 10/3/2022 10/2/2022 B - Approved as noted Answered
CO A 10/3/2022 10/2/2022 B - Approved as noted Answered
CO A 10/3/2022 10/2/2022 B - Approved as noted Answered
CO A 10/3/2022 10/2/2022 B - Approved as noted Answered
CO A 10/3/2022 10/2/2022 B - Approved as noted Answered
CO A 10/3/2022 10/2/2022 B - Approved as noted Answered
JG C 9/7/2022 9/6/2022 C - Revise & Resubmit Answered
SW LS 10/8/2022 10/3/2022 B - Approved as noted Answered
SW C 10/4/2022 10/4/2022 B - Approved as noted Answered
SW C 10/4/2022 10/6/2022 B - Approved as noted Answered
SW C 10/4/2022 10/6/2022 B - Approved as noted Answered
SW C 10/4/2022 10/8/2022 B - Approved as noted Answered
SW C 10/4/2022 10/8/2022 B - Approved as noted Answered
SW C 10/4/2022 10/6/2022 B - Approved as noted Answered
SW C 10/4/2022 10/6/2022 B - Approved as noted Answered
SW C 10/4/2022 10/6/2022 C - Revise & Resubmit Answered
SW C 10/4/2022 10/6/2022 B - Approved as noted Answered
SW C 10/4/2022 10/6/2022 B - Approved as noted Answered
SW C 10/4/2022 10/6/2022 B - Approved as noted Answered
SW C 10/4/2022 10/5/2022 B - Approved as noted Answered
SW C 10/4/2022 10/8/2022 B - Approved as noted Answered
SW C 10/4/2022 10/3/2022 B - Approved as noted Answered
RG C 10/4/2022 10/4/2022 B - Approved as noted Answered
RG C 10/4/2022 10/4/2022 B - Approved as noted Answered
SW C 10/3/2022 10/6/2022 B - Approved as noted Answered
SW C 10/3/2022 10/6/2022 B - Approved as noted Answered
CF P 10/4/2022 10/3/2022 B - Approved as noted Answered
SW C 10/3/2022 10/2/2022 B - Approved as noted Answered
SW C 10/3/2022 10/11/2022 B - Approved as noted Answered
PC P 10/4/2022 10/3/2022 B - Approved as noted Answered
SW C 10/3/2022 10/5/2022 B - Approved as noted Answered
SW C 10/3/2022 10/5/2022 B - Approved as noted Answered
SW C 10/3/2022 10/3/2022 B - Approved as noted Answered
SW C 10/3/2022 10/3/2022 B - Approved as noted Answered
SW C 10/3/2022 10/5/2022 B - Approved as noted Answered
SW C 10/3/2022 10/4/2022 C - Revise & Resubmit Answered
SW C 10/8/2022 10/2/2022 B - Approved as noted Answered
CO A 10/3/2022 10/2/2022 B - Approved as noted Answered
CO A 10/3/2022 10/2/2022 B - Approved as noted Answered
JG C 10/4/2022 10/3/2022 B - Approved as noted Answered
VG C 10/4/2022 10/8/2022 B - Approved as noted Answered
EC S 10/4/2022 10/3/2022 B - Approved as noted Answered
EC S 10/4/2022 10/3/2022 B - Approved as noted Answered
EC SU 10/4/2022 10/3/2022 B - Approved as noted Answered
MC S 10/4/2022 10/3/2022 B - Approved as noted Answered
MC S 10/4/2022 10/3/2022 B - Approved as noted Answered
MC S 10/4/2022 10/3/2022 B - Approved as noted Answered
MC SU 10/4/2022 10/3/2022 B - Approved as noted Answered
CF S 10/4/2022 10/3/2022 B - Approved as noted Answered
CF S 10/4/2022 10/3/2022 B - Approved as noted Answered
CF S 10/4/2022 10/3/2022 B - Approved as noted Answered
CF SU 10/4/2022 10/3/2022 B - Approved as noted Answered
CO S 10/4/2022 10/3/2022 B - Approved as noted Answered
CO S 10/4/2022 10/3/2022 B - Approved as noted Answered
CO SU 10/4/2022 10/3/2022 B - Approved as noted Answered
WG LS 10/3/2022 10/2/2022 B - Approved as noted Answered
CO SS 10/3/2022 10/3/2022 B - Approved as noted Answered
CO S 10/4/2022 10/3/2022 B - Approved as noted Answered
CO S 10/4/2022 10/3/2022 B - Approved as noted Answered
WG LS 10/3/2022 10/2/2022 B - Approved as noted Answered
CO S 10/4/2022 10/3/2022 B - Approved as noted Answered
WG C 10/3/2022 10/6/2022 B - Approved as noted Answered
CO S 10/4/2022 10/3/2022 B - Approved as noted Answered
CO S 10/4/2022 10/3/2022 B - Approved as noted Answered
WG C 10/3/2022 10/8/2022 C - Revise & Resubmit Answered
CO A 10/3/2022 10/2/2022 B - Approved as noted Answered
WG C 10/3/2022 10/2/2022 B - Approved as noted Answered
PT A 10/3/2022 10/2/2022 B - Approved as noted Answered
WG S 10/3/2022 10/2/2022 B - Approved as noted Answered
TB S 10/6/2022 10/2/2022 B - Approved as noted Answered
CO A 10/3/2022 10/2/2022 B - Approved as noted Answered
CO A 10/4/2022 10/3/2022 B - Approved as noted Answered
TB SU 10/3/2022 10/2/2022 B - Approved as noted Answered
CO SU 10/4/2022 10/3/2022 B - Approved as noted Answered
CO SU 10/2/2022 10/1/2022 B - Approved as noted Answered
CO S 10/4/2022 10/3/2022 B - Approved as noted Answered
CO S 10/4/2022 10/4/2022 B - Approved as noted Answered
CO A 10/3/2022 10/2/2022 C - Revise & Resubmit Answered
CO A 10/3/2022 10/2/2022 B - Approved as noted Answered
CO A 10/3/2022 10/2/2022 B - Approved as noted Answered
CO A 10/3/2022 10/2/2022 B - Approved as noted Answered
CO A 10/3/2022 10/2/2022 B - Approved as noted Answered
CO A 10/3/2022 10/2/2022 B - Approved as noted Answered
CO A 10/3/2022 10/2/2022 B - Approved as noted Answered
CO A 10/3/2022 10/2/2022 B - Approved as noted Answered
CO A 10/2/2022 10/1/2022 B - Approved as noted Answered
CO A 10/2/2022 10/1/2022 C - Revise & Resubmit Answered
CO A 10/2/2022 10/1/2022 B - Approved as noted Answered
CO A 10/2/2022 10/1/2022 B - Approved as noted Answered
CO A 10/2/2022 10/1/2022 B - Approved as noted Answered
CO A 10/2/2022 10/1/2022 C - Revise & Resubmit Answered
CO A 10/2/2022 10/1/2022 B - Approved as noted Answered
CO A 10/2/2022 10/1/2022 B - Approved as noted Answered
CO A 10/2/2022 10/1/2022 B - Approved as noted Answered
SW C 10/3/2022 10/4/2022 B - Approved as noted Answered
PA LS 10/3/2022 10/2/2022 C - Revise & Resubmit Answered
SW LS 10/3/2022 10/2/2022 B - Approved as noted Answered
SW LS 10/3/2022 10/2/2022 B - Approved as noted Answered
SW M 10/3/2022 10/2/2022 B - Approved as noted Answered
SW M 10/3/2022 10/2/2022 B - Approved as noted Answered
SW M 10/9/2022 10/2/2022 B - Approved as noted Answered
VG S 10/3/2022 10/4/2022 B - Approved as noted Answered
SW LS 10/2/2022 10/1/2022 B - Approved as noted Answered
SW LS 10/2/2022 10/1/2022 A - Approved Answered
SW LS 10/2/2022 10/1/2022 A - Approved Answered
EC S 10/2/2022 10/1/2022 B - Approved as noted Answered
CO SU 10/2/2022 10/1/2022 B - Approved as noted Answered
CO S 10/2/2022 10/1/2022 B - Approved as noted Answered
CO S 10/2/2022 10/1/2022 B - Approved as noted Answered
CO SU 10/2/2022 10/1/2022 B - Approved as noted Answered
MC S 10/2/2022 10/1/2022 B - Approved as noted Answered
MC S 10/2/2022 10/1/2022 B - Approved as noted Answered
MC SU 10/2/2022 10/1/2022 B - Approved as noted Answered
EC A 10/2/2022 10/1/2022 B - Approved as noted Answered
EC C 10/2/2022 10/4/2022 B - Approved as noted Answered
CO S 10/2/2022 10/1/2022 B - Approved as noted Answered
CO C 10/3/2022 10/6/2022 B - Approved as noted Answered
CO C 10/3/2022 10/5/2022 B - Approved as noted Answered
CO C 10/3/2022 10/6/2022 B - Approved as noted Answered
EC S 10/3/2022 10/4/2022 B - Approved as noted Answered
CO S 10/3/2022 10/2/2022 B - Approved as noted Answered
CO S 10/3/2022 10/4/2022 B - Approved as noted Answered
CO S 10/3/2022 10/2/2022 B - Approved as noted Answered
VG C 10/3/2022 10/5/2022 B - Approved as noted Answered
VG C 10/3/2022 10/6/2022 B - Approved as noted Answered
EC C 10/3/2022 10/6/2022 B - Approved as noted Answered
EC SU 10/3/2022 10/2/2022 B - Approved as noted Answered
EC SU 10/3/2022 10/2/2022 B - Approved as noted Answered
CF S 10/3/2022 10/2/2022 C - Revise & Resubmit Answered
CC S 10/3/2022 10/4/2022 B - Approved as noted Answered
CC S 10/3/2022 10/4/2022 B - Approved as noted Answered
CC S 10/3/2022 10/4/2022 B - Approved as noted Answered
CF LC 10/2/2022 10/1/2022 B - Approved as noted Answered
CC SU 10/3/2022 10/2/2022 B - Approved as noted Answered
CF LC 10/2/2022 10/1/2022 C - Revise & Resubmit Answered
EC S 10/6/2022 10/2/2022 B - Approved as noted Answered
CO S 10/3/2022 10/2/2022 B - Approved as noted Answered
CO SU 10/3/2022 10/2/2022 B - Approved as noted Answered
VG C 10/3/2022 10/6/2022 B - Approved as noted Answered
VG S 10/3/2022 10/2/2022 B - Approved as noted Answered
VG S 10/3/2022 10/2/2022 B - Approved as noted Answered
VG S 10/3/2022 10/2/2022 B - Approved as noted Answered
VG C 10/3/2022 10/10/2022 B - Approved as noted Answered
SM S 10/3/2022 10/2/2022 B - Approved as noted Answered
RG C 10/3/2022 10/6/2022 B - Approved as noted Answered
CO C 10/3/2022 10/5/2022 B - Approved as noted Answered
CO S 10/3/2022 10/2/2022 B - Approved as noted Answered
CF S 10/3/2022 10/2/2022 B - Approved as noted Answered
CF S 10/3/2022 10/2/2022 B - Approved as noted Answered
CF SU 10/3/2022 10/2/2022 B - Approved as noted Answered
CO S 10/3/2022 10/2/2022 B - Approved as noted Answered
CO S 10/3/2022 10/2/2022 B - Approved as noted Answered
CO S 10/3/2022 10/2/2022 B - Approved as noted Answered
CO A 10/3/2022 10/2/2022 B - Approved as noted Answered
CO A 10/3/2022 10/2/2022 B - Approved as noted Answered
TG E 9/28/2022 9/27/2022 C - Revise & Resubmit Answered
SW C 9/29/2022 10/2/2022 B - Approved as noted Answered
PT A 10/2/2022 10/1/2022 B - Approved as noted Answered
WG LS 10/4/2022 9/29/2022 B - Approved as noted Answered
PG LS 10/3/2022 9/29/2022 B - Approved as noted Answered
PG C 10/1/2022 10/1/2022 B - Approved as noted Answered
WG P 10/1/2022 9/29/2022 B - Approved as noted Answered
SW M 10/5/2022 9/29/2022 B - Approved as noted Answered
SW M 10/5/2022 9/29/2022 B - Approved as noted Answered
SM P 10/1/2022 9/29/2022 B - Approved as noted Answered
CC M 10/1/2022 9/29/2022 B - Approved as noted Answered
DG LS 10/2/2022 10/1/2022 B - Approved as noted Answered
DG LS 10/4/2022 10/1/2022 B - Approved as noted Answered
SW C 10/2/2022 10/3/2022 B - Approved as noted Answered
SW C 10/2/2022 10/2/2022 B - Approved as noted Answered
SW C 10/2/2022 10/1/2022 A - Approved Answered
SW C 10/2/2022 10/3/2022 B - Approved as noted Answered
SW C 10/2/2022 10/3/2022 B - Approved as noted Answered
SW C 10/2/2022 10/5/2022 B - Approved as noted Answered
SW C 10/2/2022 10/1/2022 B - Approved as noted Answered
SW C 10/2/2022 10/4/2022 B - Approved as noted Answered
SW C 10/2/2022 10/4/2022 B - Approved as noted Answered
SW C 10/2/2022 10/5/2022 B - Approved as noted Answered
SW C 10/2/2022 10/5/2022 B - Approved as noted Answered
SW C 10/2/2022 10/4/2022 B - Approved as noted Answered
SW C 10/2/2022 10/4/2022 B - Approved as noted Answered
SW C 10/2/2022 10/3/2022 B - Approved as noted Answered
SW C 10/2/2022 10/3/2022 B - Approved as noted Answered
SW C 10/2/2022 10/3/2022 B - Approved as noted Answered
MB SS 8/15/2022 8/14/2022 B - Approved as noted Answered
MB SS 8/15/2022 8/14/2022 B - Approved as noted Answered
PG C 10/1/2022 10/2/2022 B - Approved as noted Answered
WG C 10/1/2022 10/3/2022 B - Approved as noted Answered
WG C 10/1/2022 10/3/2022 B - Approved as noted Answered
ZG C 10/1/2022 9/29/2022 B - Approved as noted Answered
WG SU 10/1/2022 9/29/2022 B - Approved as noted Answered
WG SU 10/1/2022 9/29/2022 B - Approved as noted Answered
PG SU 10/1/2022 9/29/2022 B - Approved as noted Answered
WG SU 10/1/2022 10/29/2022 B - Approved as noted Answered
EC C 10/1/2022 10/2/2022 B - Approved as noted Answered
CO S 10/1/2022 9/29/2022 B - Approved as noted Answered
CO S 10/1/2022 9/29/2022 B - Approved as noted Answered
CO S 10/1/2022 9/29/2022 B - Approved as noted Answered
CO S 10/1/2022 9/29/2022 B - Approved as noted Answered
PG S 10/1/2022 9/29/2022 B - Approved as noted Answered
EC S 10/1/2022 9/29/2022 B - Approved as noted Answered
CO S 10/1/2022 9/29/2022 B - Approved as noted Answered
EC S 10/1/2022 9/29/2022 B - Approved as noted Answered
EC SU 10/1/2022 9/29/2022 B - Approved as noted Answered
WG S 10/1/2022 9/29/2022 B - Approved as noted Answered
EC S 10/1/2022 9/29/2022 B - Approved as noted Answered
TG S 10/1/2022 9/29/2022 B - Approved as noted Answered
EC SU 10/1/2022 9/29/2022 B - Approved as noted Answered
PG S 10/1/2022 9/29/2022 B - Approved as noted Answered
CO C 10/1/2022 10/4/2022 B - Approved as noted Answered
CO S 10/1/2022 9/29/2022 B - Approved as noted Answered
TT A 10/1/2022 9/29/2022 B - Approved as noted Answered
CO S 10/1/2022 9/29/2022 B - Approved as noted Answered
TT A 10/1/2022 9/29/2022 B - Approved as noted Answered
PG A 10/1/2022 9/29/2022 B - Approved as noted Answered
CO S 10/1/2022 9/29/2022 B - Approved as noted Answered
RG C 10/1/2022 10/4/2022 B - Approved as noted Answered
ZG A 10/1/2022 9/29/2022 B - Approved as noted Answered
RG C 10/1/2022 10/2/2022 B - Approved as noted Answered
DG A 10/1/2022 9/29/2022 B - Approved as noted Answered
CO C 10/1/2022 10/5/2022 B - Approved as noted Answered
CO C 10/1/2022 10/2/2022 B - Approved as noted Answered
CO C 10/1/2022 9/29/2022 B - Approved as noted Answered
VG S 10/1/2022 9/29/2022 B - Approved as noted Answered
VG S 10/1/2022 9/29/2022 B - Approved as noted Answered
CO S 10/1/2022 9/29/2022 B - Approved as noted Answered
CO S 10/1/2022 9/29/2022 B - Approved as noted Answered
CO S 10/1/2022 9/29/2022 B - Approved as noted Answered
CO S 10/1/2022 9/29/2022 B - Approved as noted Answered
CO S 10/1/2022 9/29/2022 B - Approved as noted Answered
CO SU 10/1/2022 9/29/2022 B - Approved as noted Answered
CO S 10/4/2022 9/29/2022 B - Approved as noted Answered
CO S 10/1/2022 9/29/2022 B - Approved as noted Answered
CO S 10/1/2022 9/29/2022 B - Approved as noted Answered
CO A 10/1/2022 9/29/2022 B - Approved as noted Answered
CO A 10/1/2022 9/29/2022 B - Approved as noted Answered
CO S 10/1/2022 9/29/2022 B - Approved as noted Answered
VG S 10/1/2022 9/29/2022 B - Approved as noted Answered
TG LS 9/4/2022 9/28/2022 B - Approved as noted Answered
TG LS 9/4/2022 9/28/2022 B - Approved as noted Answered
WG C 9/29/2022 10/1/2022 B - Approved as noted Answered
SG C 9/29/2022 10/1/2022 B - Approved as noted Answered
WG C 9/29/2022 10/2/2022 B - Approved as noted Answered
WG C 9/29/2022 10/2/2022 B - Approved as noted Answered
WG C 9/29/2022 10/2/2022 B - Approved as noted Answered
WG A 9/29/2022 9/28/2022 B - Approved as noted Answered
SW C 10/1/2022 9/29/2022 A - Approved Answered
SW C 10/1/2022 10/6/2022 B - Approved as noted Answered
SW C 10/1/2022 9/29/2022 B - Approved as noted Answered
SW C 10/1/2022 9/29/2022 B - Approved as noted Answered
SW C 10/1/2022 10/2/2022 B - Approved as noted Answered
SW C 10/1/2022 10/4/2022 B - Approved as noted Answered
SW C 10/1/2022 9/29/2022 B - Approved as noted Answered
SW C 10/1/2022 10/4/2022 B - Approved as noted Answered
SW C 10/1/2022 10/4/2022 B - Approved as noted Answered
SW C 10/1/2022 10/2/2022 B - Approved as noted Answered
WG S 9/29/2022 9/28/2022 B - Approved as noted Answered
SW C 10/1/2022 9/29/2022 B - Approved as noted Answered
SW C 10/1/2022 10/2/2022 B - Approved as noted Answered
SW C 10/1/2022 10/3/2022 B - Approved as noted Answered
SW C 10/1/2022 10/3/2022 B - Approved as noted Answered
SW C 10/1/2022 10/3/2022 B - Approved as noted Answered
SW C 10/1/2022 10/2/2022 B - Approved as noted Answered
SW C 10/1/2022 10/4/2022 B - Approved as noted Answered
SW C 10/1/2022 10/4/2022 B - Approved as noted Answered
SW C 10/1/2022 9/29/2022 B - Approved as noted Answered
SW C 10/1/2022 10/4/2022 B - Approved as noted Answered
SW LS 10/2/2022 9/28/2022 B - Approved as noted Answered
SW C 9/29/2022 10/2/2022 B - Approved as noted Answered
SW C 9/29/2022 10/1/2022 B - Approved as noted Answered
SW C 9/29/2022 10/2/2022 B - Approved as noted Answered
SW C 9/29/2022 10/2/2022 B - Approved as noted Answered
SW C 9/29/2022 10/1/2022 B - Approved as noted Answered
SW C 9/29/2022 10/1/2022 B - Approved as noted Answered
SW C 9/29/2022 10/2/2022 B - Approved as noted Answered
SW C 9/29/2022 10/2/2022 B - Approved as noted Answered
SW C 9/29/2022 10/1/2022 B - Approved as noted Answered
SW C 9/29/2022 10/2/2022 B - Approved as noted Answered
SW C 9/29/2022 10/2/2022 B - Approved as noted Answered
SW C 9/29/2022 9/28/2022 B - Approved as noted Answered
SW C 9/29/2022 10/2/2022 B - Approved as noted Answered
SW C 9/29/2022 10/2/2022 B - Approved as noted Answered
SW C 9/29/2022 10/2/2022 B - Approved as noted Answered
SW C 9/29/2022 10/2/2022 B - Approved as noted Answered
SW C 9/29/2022 10/1/2022 B - Approved as noted Answered
SW C 9/29/2022 10/1/2022 B - Approved as noted Answered
SW C 9/29/2022 9/28/2022 B - Approved as noted Answered
SW C 9/29/2022 10/1/2022 B - Approved as noted Answered
SW C 9/29/2022 10/1/2022 B - Approved as noted Answered
PG C 9/29/2022 9/27/2022 B - Approved as noted Answered
ZG LS 9/29/2022 9/28/2022 A - Approved Answered
SG LS 9/29/2022 9/28/2022 B - Approved as noted Answered
PG LS 10/4/2022 9/28/2022 B - Approved as noted Answered
SW LS 10/2/2022 9/28/2022 B - Approved as noted Answered
SW LS 10/2/2022 9/28/2022 B - Approved as noted Answered
CO S 9/29/2022 9/28/2022 B - Approved as noted Answered
CO SU 9/29/2022 9/28/2022 B - Approved as noted Answered
MC S 9/29/2022 9/28/2022 B - Approved as noted Answered
MC S 9/29/2022 9/28/2022 B - Approved as noted Answered
WG LS 10/4/2022 9/27/2022 B - Approved as noted Answered
MC SU 9/29/2022 9/28/2022 B - Approved as noted Answered
WG LS 10/4/2022 9/27/2022 B - Approved as noted Answered
WG C 9/28/2022 10/1/2022 B - Approved as noted Answered
RG C 9/29/2022 10/4/2022 B - Approved as noted Answered
WG C 9/28/2022 10/1/2022 B - Approved as noted Answered
RG C 9/29/2022 10/2/2022 B - Approved as noted Answered
ZG C 9/28/2022 9/29/2022 B - Approved as noted Answered
VG C 9/29/2022 10/2/2022 B - Approved as noted Answered
CO S 9/29/2022 9/28/2022 B - Approved as noted Answered
CO S 9/29/2022 9/28/2022 B - Approved as noted Answered
MB A 9/28/2022 9/27/2022 B - Approved as noted Answered
CO S 9/29/2022 9/28/2022 B - Approved as noted Answered
CO S 9/29/2022 9/28/2022 B - Approved as noted Answered
WG A 9/28/2022 9/27/2022 B - Approved as noted Answered
RG C 9/29/2022 10/1/2022 B - Approved as noted Answered
RG SU 9/29/2022 10/28/2022 B - Approved as noted Answered
PG SU 9/28/2022 9/27/2022 B - Approved as noted Answered
CO A 9/29/2022 9/28/2022 B - Approved as noted Answered
CO A 9/29/2022 9/28/2022 B - Approved as noted Answered
PG S 9/28/2022 9/27/2022 B - Approved as noted Answered
CO A 9/29/2022 9/28/2022 B - Approved as noted Answered
CF S 9/29/2022 9/28/2022 B - Approved as noted Answered
PG S 9/28/2022 9/27/2022 B - Approved as noted Answered
CO S 9/29/2022 9/28/2022 B - Approved as noted Answered
TB S 9/28/2022 9/27/2022 B - Approved as noted Answered
CO S 9/29/2022 9/28/2022 B - Approved as noted Answered
MB SS 8/1/2022 7/31/2022 C - Revise & Resubmit Answered
MB SS 8/1/2022 7/31/2022 C - Revise & Resubmit Answered
TB LC 9/28/2022 9/27/2022 B - Approved as noted Answered
TB E 9/28/2022 9/27/2022 B - Approved as noted Answered
TB E 9/29/2022 9/28/2022 B - Approved as noted Answered
CO SU 9/28/2022 9/27/2022 B - Approved as noted Answered
LM S 9/28/2022 9/27/2022 B - Approved as noted Answered
CO S 9/28/2022 9/27/2022 B - Approved as noted Answered
CO SU 9/28/2022 9/27/2022 B - Approved as noted Answered
CF S 9/28/2022 9/27/2022 B - Approved as noted Answered
RG C 9/28/2022 9/27/2022 B - Approved as noted Answered
CO C 9/28/2022 10/2/2022 B - Approved as noted Answered
CO C 9/28/2022 10/2/2022 B - Approved as noted Answered
CO C 9/28/2022 10/2/2022 B - Approved as noted Answered
LM S 9/28/2022 9/27/2022 B - Approved as noted Answered
EC A 9/28/2022 9/27/2022 B - Approved as noted Answered
CO C 9/28/2022 10/1/2022 B - Approved as noted Answered
CO C 9/28/2022 10/1/2022 B - Approved as noted Answered
CF S 9/28/2022 9/27/2022 B - Approved as noted Answered
CF S 9/28/2022 9/27/2022 B - Approved as noted Answered
CF SU 9/28/2022 9/27/2022 B - Approved as noted Answered
VG S 9/28/2022 9/27/2022 B - Approved as noted Answered
VG S 9/28/2022 9/27/2022 B - Approved as noted Answered
VG SU 9/28/2022 9/27/2022 B - Approved as noted Answered
CO S 9/28/2022 9/27/2022 B - Approved as noted Answered
CO S 9/28/2022 9/27/2022 B - Approved as noted Answered
CO S 9/28/2022 9/27/2022 B - Approved as noted Answered
CO S 9/28/2022 9/27/2022 B - Approved as noted Answered
SW C 9/28/2022 10/2/2022 B - Approved as noted Answered
SW C 9/28/2022 9/28/2022 B - Approved as noted Answered
SW C 9/28/2022 10/1/2022 B - Approved as noted Answered
SW C 9/28/2022 10/2/2022 B - Approved as noted Answered
SW C 9/28/2022 9/27/2022 B - Approved as noted Answered
SW C 9/28/2022 10/1/2022 B - Approved as noted Answered
SW C 9/28/2022 9/28/2022 B - Approved as noted Answered
SW C 9/28/2022 9/28/2022 B - Approved as noted Answered
SW C 9/28/2022 9/29/2022 B - Approved as noted Answered
SW C 9/28/2022 10/1/2022 B - Approved as noted Answered
SW C 9/28/2022 9/27/2022 B - Approved as noted Answered
SW C 9/28/2022 9/28/2022 B - Approved as noted Answered
SW C 9/28/2022 9/28/2022 B - Approved as noted Answered
SW C 9/27/2022 9/27/2022 B - Approved as noted Answered
SW C 9/27/2022 9/26/2022 B - Approved as noted Answered
CO SU 9/28/2022 9/27/2022 B - Approved as noted Answered
CO S 9/28/2022 9/27/2022 B - Approved as noted Answered
CO S 9/28/2022 9/27/2022 B - Approved as noted Answered
CO S 9/28/2022 9/27/2022 B - Approved as noted Answered
CO SU 9/28/2022 9/27/2022 B - Approved as noted Answered
CO S 9/28/2022 9/27/2022 B - Approved as noted Answered
CO S 9/28/2022 9/27/2022 B - Approved as noted Answered
SW M 10/2/2022 9/27/2022 B - Approved as noted Answered
SW C 9/27/2022 9/26/2022 B - Approved as noted Answered
SW C 9/27/2022 9/29/2022 B - Approved as noted Answered
SW M 10/2/2022 9/27/2022 B - Approved as noted Answered
SW C 9/27/2022 10/1/2022 B - Approved as noted Answered
SW M 9/28/2022 9/27/2022 C - Revise & Resubmit Answered
SW C 9/27/2022 9/29/2022 B - Approved as noted Answered
CO SU 9/28/2022 9/27/2022 B - Approved as noted Answered
SW C 9/27/2022 9/29/2022 B - Approved as noted Answered
EC S 9/28/2022 9/27/2022 B - Approved as noted Answered
SW C 9/27/2022 9/27/2022 B - Approved as noted Answered
EC S 9/28/2022 9/27/2022 B - Approved as noted Answered
SW C 9/27/2022 9/27/2022 B - Approved as noted Answered
EC SU 9/28/2022 9/27/2022 B - Approved as noted Answered
SW C 9/27/2022 9/26/2022 B - Approved as noted Answered
LM SU 9/28/2022 9/27/2022 B - Approved as noted Answered
MC S 9/28/2022 9/27/2022 B - Approved as noted Answered
SW C 9/27/2022 9/27/2022 B - Approved as noted Answered
MC S 9/28/2022 9/27/2022 B - Approved as noted Answered
MC S 9/28/2022 9/27/2022 B - Approved as noted Answered
SW C 9/27/2022 9/26/2022 B - Approved as noted Answered
MC SU 9/28/2022 9/27/2022 B - Approved as noted Answered
MC S 9/29/2022 9/28/2022 B - Approved as noted Answered
LM SU 9/28/2022 9/27/2022 C - Revise & Resubmit Answered
LM S 9/28/2022 9/27/2022 B - Approved as noted Answered
LM S 9/28/2022 9/27/2022 B - Approved as noted Answered
CO S 9/21/2022 9/20/2022 B - Approved as noted Answered
RG C 9/21/2022 9/20/2022 B - Approved as noted Answered
SW LC 8/31/2022 8/30/2022 B - Approved as noted Answered
MC SU 9/25/2022 9/24/2022 B - Approved as noted Answered
CO S 9/28/2022 9/27/2022 B - Approved as noted Answered
CO S 9/28/2022 9/27/2022 B - Approved as noted Answered
PC S 9/28/2022 9/27/2022 B - Approved as noted Answered
PC SU 9/28/2022 9/27/2022 B - Approved as noted Answered
WG C 9/27/2022 9/28/2022 B - Approved as noted Answered
SW C 9/27/2022 9/27/2022 B - Approved as noted Answered
WG C 9/27/2022 9/28/2022 B - Approved as noted Answered
WG C 9/27/2022 9/28/2022 B - Approved as noted Answered
WG C 9/27/2022 9/28/2022 B - Approved as noted Answered
WG C 9/27/2022 9/28/2022 B - Approved as noted Answered
WG C 9/27/2022 9/28/2022 B - Approved as noted Answered
PG S 9/27/2022 9/26/2022 B - Approved as noted Answered
MB A 9/27/2022 9/26/2022 B - Approved as noted Answered
VG S 9/24/2022 9/21/2022 B - Approved as noted Answered
MB A 9/27/2022 9/26/2022 B - Approved as noted Answered
CO SU 9/27/2022 9/26/2022 B - Approved as noted Answered
CO S 9/27/2022 9/26/2022 B - Approved as noted Answered
CO SU 9/27/2022 9/26/2022 B - Approved as noted Answered
WG LS 9/29/2022 9/26/2022 B - Approved as noted Answered
PC S 9/27/2022 9/26/2022 B - Approved as noted Answered
CO A 9/27/2022 9/26/2022 B - Approved as noted Answered
WG LS 9/29/2022 9/26/2022 B - Approved as noted Answered
CO S 9/27/2022 9/26/2022 B - Approved as noted Answered
MB E 9/26/2022 9/25/2022 B - Approved as noted Answered
CO S 9/27/2022 9/26/2022 B - Approved as noted Answered
RG C 9/27/2022 9/29/2022 B - Approved as noted Answered
CO C 9/27/2022 9/29/2022 B - Approved as noted Answered
WG LS 9/27/2022 9/26/2022 B - Approved as noted Answered
CO C 9/27/2022 9/29/2022 B - Approved as noted Answered
LG C 9/29/2022 9/26/2022 B - Approved as noted Answered
CO C 9/27/2022 10/1/2022 B - Approved as noted Answered
CO C 9/27/2022 9/29/2022 B - Approved as noted Answered
CO S 9/27/2022 9/26/2022 B - Approved as noted Answered
CF S 10/2/2022 9/26/2022 B - Approved as noted Answered
MC SU 9/27/2022 9/26/2022 B - Approved as noted Answered
MC S 9/27/2022 9/26/2022 B - Approved as noted Answered
CO S 9/27/2022 9/26/2022 B - Approved as noted Answered
WG LS 9/27/2022 9/26/2022 B - Approved as noted Answered
CO S 9/27/2022 9/26/2022 B - Approved as noted Answered
MC S 9/27/2022 9/26/2022 B - Approved as noted Answered
TG SU 9/29/2022 9/28/2022 B - Approved as noted Answered
CO A 9/27/2022 9/28/2022 B - Approved as noted Answered
CO S 9/27/2022 9/26/2022 B - Approved as noted Answered
CO S 9/27/2022 9/26/2022 B - Approved as noted Answered
ST S 9/27/2022 9/26/2022 B - Approved as noted Answered
ST S 9/27/2022 9/26/2022 B - Approved as noted Answered
SW C 9/24/2022 10/2/2022 B - Approved as noted Answered
ST S 9/27/2022 9/26/2022 B - Approved as noted Answered
CO S 9/27/2022 9/26/2022 B - Approved as noted Answered
CO S 9/27/2022 9/26/2022 B - Approved as noted Answered
CO SU 9/27/2022 9/26/2022 B - Approved as noted Answered
MC S 9/27/2022 9/28/2022 B - Approved as noted Answered
CO SU 9/27/2022 9/26/2022 B - Approved as noted Answered
CO SS 9/21/2022 9/20/2022 B - Approved as noted Answered
CO S 9/26/2022 9/25/2022 B - Approved as noted Answered
CO S 9/26/2022 9/25/2022 B - Approved as noted Answered
CF SU 9/26/2022 9/26/2022 B - Approved as noted Answered
CF S 9/26/2022 9/28/2022 B - Approved as noted Answered
CF S 9/26/2022 9/28/2022 B - Approved as noted Answered
CF S 9/26/2022 10/4/2022 B - Approved as noted Answered
CO C 9/26/2022 9/28/2022 B - Approved as noted Answered
EC S 9/26/2022 9/28/2022 B - Approved as noted Answered
CO S 9/26/2022 9/25/2022 B - Approved as noted Answered
EC A 9/26/2022 9/25/2022 B - Approved as noted Answered
EC SU 9/26/2022 9/25/2022 B - Approved as noted Answered
EC S 9/26/2022 9/25/2022 B - Approved as noted Answered
CO S 9/26/2022 9/25/2022 B - Approved as noted Answered
CO C 9/26/2022 9/27/2022 B - Approved as noted Answered
CO C 9/26/2022 9/25/2022 B - Approved as noted Answered
RG C 9/26/2022 9/27/2022 B - Approved as noted Answered
CO S 9/26/2022 9/25/2022 B - Approved as noted Answered
CO C 9/26/2022 9/26/2022 B - Approved as noted Answered
CO S 9/26/2022 9/28/2022 B - Approved as noted Answered
CO S 9/26/2022 9/28/2022 B - Approved as noted Answered
MC S 9/26/2022 9/25/2022 B - Approved as noted Answered
LM S 9/26/2022 9/25/2022 C - Revise & Resubmit Answered
CO S 9/26/2022 9/28/2022 B - Approved as noted Answered
MC SU 9/26/2022 9/25/2022 B - Approved as noted Answered
CO SU 9/26/2022 9/25/2022 B - Approved as noted Answered
SW C 9/27/2022 9/27/2022 B - Approved as noted Answered
CO SU 9/26/2022 9/25/2022 B - Approved as noted Answered
CO S 9/26/2022 9/25/2022 B - Approved as noted Answered
SW C 9/27/2022 10/26/2022 B - Approved as noted Answered
CO S 9/26/2022 9/25/2022 B - Approved as noted Answered
CO C 9/26/2022 9/28/2022 B - Approved as noted Answered
CO C 9/26/2022 9/25/2022 B - Approved as noted Answered
CO C 9/26/2022 9/26/2022 B - Approved as noted Answered
RG C 9/26/2022 9/26/2022 B - Approved as noted Answered
PG LS 9/27/2022 9/26/2022 B - Approved as noted Answered
WG P 9/27/2022 9/26/2022 B - Approved as noted Answered
SW M 9/29/2022 9/26/2022 B - Approved as noted Answered
RG C 9/27/2022 9/27/2022 B - Approved as noted Answered
RG C 9/26/2022 9/25/2022 B - Approved as noted Answered
CO C 9/26/2022 9/25/2022 B - Approved as noted Answered
CO SU 9/26/2022 9/25/2022 B - Approved as noted Answered
CO SU 9/26/2022 9/25/2022 B - Approved as noted Answered
CO S 9/26/2022 9/25/2022 B - Approved as noted Answered
EC C 9/26/2022 9/28/2022 B - Approved as noted Answered
CO S 9/26/2022 9/25/2022 B - Approved as noted Answered
PG C 9/3/2022 8/29/2022 B - Approved as noted Answered
LM E 9/1/2022 8/29/2022 C - Revise & Resubmit Answered
TT E 9/26/2022 10/25/2022 C - Revise & Resubmit Answered
PG SU 9/26/2022 9/25/2022 B - Approved as noted Answered
MB A 9/26/2022 9/25/2022 B - Approved as noted Answered
WG C 9/26/2022 9/25/2022 B - Approved as noted Answered
WG C 9/26/2022 9/27/2022 B - Approved as noted Answered
WG C 9/26/2022 9/27/2022 B - Approved as noted Answered
PG C 9/26/2022 9/25/2022 B - Approved as noted Answered
PG S 9/28/2022 9/25/2022 B - Approved as noted Answered
TG S 9/26/2022 9/25/2022 B - Approved as noted Answered
TG LS 9/26/2022 9/25/2022 B - Approved as noted Answered
DG LS 9/26/2022 9/25/2022 B - Approved as noted Answered
DG LS 9/27/2022 9/25/2022 B - Approved as noted Answered
DG LS 9/26/2022 9/25/2022 B - Approved as noted Answered
SW C 9/26/2022 9/27/2022 B - Approved as noted Answered
SW C 9/26/2022 9/27/2022 B - Approved as noted Answered
SW C 9/26/2022 9/27/2022 B - Approved as noted Answered
SW C 9/26/2022 9/27/2022 B - Approved as noted Answered
SW C 9/26/2022 10/25/2022 B - Approved as noted Answered
SW C 9/26/2022 9/27/2022 B - Approved as noted Answered
SW C 9/26/2022 9/27/2022 B - Approved as noted Answered
SW C 9/26/2022 9/27/2022 B - Approved as noted Answered
SW C 9/26/2022 9/27/2022 B - Approved as noted Answered
SW C 9/26/2022 9/28/2022 B - Approved as noted Answered
SW C 9/26/2022 9/25/2022 B - Approved as noted Answered
SW C 9/26/2022 9/26/2022 B - Approved as noted Answered
SW C 9/26/2022 9/25/2022 B - Approved as noted Answered
SW C 9/26/2022 9/26/2022 B - Approved as noted Answered
SW C 9/26/2022 9/25/2022 B - Approved as noted Answered
SW C 9/26/2022 9/26/2022 B - Approved as noted Answered
TT E 9/26/2022 10/25/2022 C - Revise & Resubmit Answered
PC LC 9/27/2022 10/25/2022 B - Approved as noted Answered
PC LC 9/26/2022 9/25/2022 B - Approved as noted Answered
SW P 9/26/2022 9/25/2022 B - Approved as noted Answered
SW P 9/26/2022 9/25/2022 B - Approved as noted Answered
SW M 9/25/2022 9/20/2022 C - Revise & Resubmit Answered
CO S 9/25/2022 9/24/2022 B - Approved as noted Answered
EC S 9/25/2022 9/24/2022 B - Approved as noted Answered
EC SU 9/25/2022 9/24/2022 B - Approved as noted Answered
EC C 9/25/2022 9/26/2022 B - Approved as noted Answered
CF S 9/25/2022 9/24/2022 B - Approved as noted Answered
CF S 9/25/2022 9/24/2022 B - Approved as noted Answered
CF SU 9/25/2022 9/24/2022 B - Approved as noted Answered
CO S 9/25/2022 9/24/2022 B - Approved as noted Answered
MC S 9/25/2022 9/24/2022 B - Approved as noted Answered
MC S 9/25/2022 9/24/2022 B - Approved as noted Answered
MC S 9/25/2022 9/24/2022 B - Approved as noted Answered
MC S 9/25/2022 9/24/2022 B - Approved as noted Answered
SW C 9/25/2022 9/27/2022 B - Approved as noted Answered
SW C 9/25/2022 9/26/2022 B - Approved as noted Answered
SW C 9/25/2022 10/1/2022 B - Approved as noted Answered
SW C 9/25/2022 9/27/2022 B - Approved as noted Answered
SW C 9/25/2022 9/26/2022 B - Approved as noted Answered
SW C 9/25/2022 9/26/2022 B - Approved as noted Answered
CO C 9/24/2022 9/26/2022 B - Approved as noted Answered
RG C 9/24/2022 9/26/2022 B - Approved as noted Answered
LM SU 9/24/2022 9/21/2022 B - Approved as noted Answered
LM S 9/24/2022 9/21/2022 B - Approved as noted Answered
CO S 9/24/2022 9/21/2022 B - Approved as noted Answered
CO S 9/24/2022 9/21/2022 B - Approved as noted Answered
VG P 9/24/2022 9/21/2022 B - Approved as noted Answered
CO S 9/24/2022 9/21/2022 B - Approved as noted Answered
VG S 9/24/2022 9/21/2022 C - Revise & Resubmit Answered
VG SU 9/24/2022 9/21/2022 B - Approved as noted Answered
CO S 9/24/2022 9/21/2022 B - Approved as noted Answered
CO S 9/24/2022 9/21/2022 B - Approved as noted Answered
CO S 9/24/2022 9/21/2022 B - Approved as noted Answered
LM S 9/24/2022 9/21/2022 B - Approved as noted Answered
LM S 9/24/2022 9/21/2022 B - Approved as noted Answered
CO SU 9/24/2022 9/21/2022 B - Approved as noted Answered
PC E 9/25/2022 9/24/2022 B - Approved as noted Answered
PG E 9/24/2022 9/21/2022 C - Revise & Resubmit Answered
PC LC 9/25/2022 9/24/2022 B - Approved as noted Answered
PC LC 9/25/2022 9/24/2022 B - Approved as noted Answered
TG LC 9/24/2022 9/21/2022 B - Approved as noted Answered
TG LC 9/24/2022 9/21/2022 B - Approved as noted Answered
TG LC 9/24/2022 9/21/2022 B - Approved as noted Answered
TG LS 9/25/2022 9/24/2022 B - Approved as noted Answered
TG LS 9/27/2022 9/24/2022 B - Approved as noted Answered
WG LS 9/25/2022 9/24/2022 B - Approved as noted Answered
WG LS 9/25/2022 9/24/2022 B - Approved as noted Answered
PG C 9/25/2022 9/24/2022 B - Approved as noted Answered
PG C 9/25/2022 9/26/2022 B - Approved as noted Answered
WG S 9/25/2022 9/24/2022 B - Approved as noted Answered
TT A 9/25/2022 9/24/2022 B - Approved as noted Answered
WG LS 9/26/2022 9/21/2022 B - Approved as noted Answered
PG S 9/24/2022 9/21/2022 B - Approved as noted Answered
WG S 9/24/2022 9/21/2022 B - Approved as noted Answered
PG C 9/24/2022 9/26/2022 B - Approved as noted Answered
WG C 9/24/2022 9/21/2022 B - Approved as noted Answered
TG C 9/24/2022 9/27/2022 B - Approved as noted Answered
PG C 9/24/2022 9/21/2022 B - Approved as noted Answered
PG C 9/24/2022 9/21/2022 B - Approved as noted Answered
WG SU 9/24/2022 9/21/2022 B - Approved as noted Answered
WG E 9/20/2022 9/19/2022 B - Approved as noted Answered
MB E 9/20/2022 9/19/2022 B - Approved as noted Answered
WG C 9/19/2022 9/18/2022 B - Approved as noted Answered
PG SU 9/21/2022 9/20/2022 B - Approved as noted Answered
WG S 9/25/2022 9/20/2022 C - Revise & Resubmit Answered
TG LS 9/26/2022 9/20/2022 B - Approved as noted Answered
TG LS 9/26/2022 9/20/2022 B - Approved as noted Answered
WG LS 9/21/2022 9/20/2022 B - Approved as noted Answered
WG LS 9/26/2022 9/20/2022 B - Approved as noted Answered
WG LS 9/26/2022 9/20/2022 B - Approved as noted Answered
PG C 9/21/2022 9/20/2022 B - Approved as noted Answered
WG C 9/21/2022 9/20/2022 B - Approved as noted Answered
WG C 9/21/2022 9/20/2022 B - Approved as noted Answered
PG C 9/26/2022 9/20/2022 B - Approved as noted Answered
SW C 9/24/2022 9/27/2022 B - Approved as noted Answered
SW C 9/24/2022 9/27/2022 B - Approved as noted Answered
SW C 9/24/2022 9/29/2022 B - Approved as noted Answered
TG C 9/21/2022 9/20/2022 B - Approved as noted Answered
SW C 9/24/2022 9/29/2022 B - Approved as noted Answered
SW C 9/24/2022 9/29/2022 B - Approved as noted Answered
SW C 9/24/2022 9/21/2022 C - Revise & Resubmit Answered
SW C 9/24/2022 9/21/2022 B - Approved as noted Answered
SW C 9/24/2022 9/21/2022 B - Approved as noted Answered
MC S 9/24/2022 9/21/2022 B - Approved as noted Answered
SW C 9/24/2022 10/1/2022 B - Approved as noted Answered
SW C 9/24/2022 9/21/2022 B - Approved as noted Answered
SW C 9/24/2022 10/2/2022 B - Approved as noted Answered
SW C 9/24/2022 9/21/2022 B - Approved as noted Answered
SW C 10/2/2022 9/21/2022 B - Approved as noted Answered
SW C 10/1/2022 9/21/2022 B - Approved as noted Answered
CO S 8/23/2022 8/22/2022 B - Approved as noted Answered
SW C 9/21/2022 9/20/2022 B - Approved as noted Answered
SW C 9/21/2022 10/1/2022 B - Approved as noted Answered
SW C 9/21/2022 9/28/2022 B - Approved as noted Answered
SW C 9/21/2022 9/26/2022 B - Approved as noted Answered
SW C 9/21/2022 10/1/2022 B - Approved as noted Answered
SW C 9/21/2022 9/20/2022 B - Approved as noted Answered
SW C 9/21/2022 9/20/2022 B - Approved as noted Answered
SW C 9/21/2022 9/20/2022 B - Approved as noted Answered
SW C 9/21/2022 9/20/2022 B - Approved as noted Answered
SW C 9/21/2022 B - Approved as noted Answered
SW C 9/21/2022 9/20/2022 B - Approved as noted Answered
SW C 9/21/2022 9/20/2022 B - Approved as noted Answered
SW C 9/21/2022 9/20/2022 B - Approved as noted Answered
SW C 9/21/2022 9/20/2022 B - Approved as noted Answered
SW C 9/21/2022 9/20/2022 B - Approved as noted Answered
SW C 9/21/2022 9/20/2022 B - Approved as noted Answered
SW C 9/21/2022 9/20/2022 B - Approved as noted Answered
SW C 9/21/2022 9/20/2022 B - Approved as noted Answered
PG SU 9/20/2022 9/19/2022 B - Approved as noted Answered
WG C 9/20/2022 9/19/2022 B - Approved as noted Answered
WG C 9/20/2022 9/19/2022 B - Approved as noted Answered
PG C 9/20/2022 9/19/2022 B - Approved as noted Answered
PG S 9/20/2022 9/19/2022 B - Approved as noted Answered
WG LS 9/26/2022 9/19/2022 B - Approved as noted Answered
WG LS 9/26/2022 9/19/2022 B - Approved as noted Answered
ZG LS 9/20/2022 9/19/2022 B - Approved as noted Answered
ZG LS 9/20/2022 9/19/2022 B - Approved as noted Answered
ZG LS 9/20/2022 9/19/2022 B - Approved as noted Answered
ZG LS 9/20/2022 9/19/2022 B - Approved as noted Answered
CO A 9/21/2022 9/20/2022 C - Revise & Resubmit Answered
CO A 9/21/2022 9/20/2022 B - Approved as noted Answered
CO A 9/21/2022 9/20/2022 B - Approved as noted Answered
VG S 9/21/2022 9/20/2022 B - Approved as noted Answered
VG S 9/21/2022 9/20/2022 B - Approved as noted Answered
VG S 9/21/2022 9/20/2022 B - Approved as noted Answered
CF S 9/21/2022 9/20/2022 B - Approved as noted Answered
CO S 9/21/2022 9/20/2022 B - Approved as noted Answered
CO C 9/21/2022 9/28/2022 B - Approved as noted Answered
RG C 9/21/2022 9/20/2022 B - Approved as noted Answered
CO C 9/21/2022 9/28/2022 B - Approved as noted Answered
CO C 9/21/2022 9/28/2022 B - Approved as noted Answered
EC A 9/21/2022 9/20/2022 C - Revise & Resubmit Answered
EC S 9/21/2022 9/20/2022 B - Approved as noted Answered
EC S 9/21/2022 9/20/2022 B - Approved as noted Answered
EC S 9/21/2022 9/20/2022 B - Approved as noted Answered
EC S 9/21/2022 9/20/2022 B - Approved as noted Answered
MC S 9/18/2022 9/17/2022 B - Approved as noted Answered
CF S 9/21/2022 9/20/2022 B - Approved as noted Answered
CF S 9/21/2022 9/20/2022 B - Approved as noted Answered
CF S 9/21/2022 9/20/2022 B - Approved as noted Answered
CF SU 9/21/2022 9/20/2022 B - Approved as noted Answered
CO SU 9/21/2022 9/20/2022 B - Approved as noted Answered
LM S 9/21/2022 9/20/2022 C - Revise & Resubmit Answered
CO S 9/21/2022 9/20/2022 B - Approved as noted Answered
CO S 9/21/2022 9/20/2022 B - Approved as noted Answered
CO S 9/21/2022 9/20/2022 C - Revise & Resubmit Answered
MC S 9/20/2022 9/19/2022 B - Approved as noted Answered
MC SU 9/20/2022 9/19/2022 B - Approved as noted Answered
SM A 9/20/2022 9/19/2022 B - Approved as noted Answered
CO S 9/20/2022 9/19/2022 B - Approved as noted Answered
CO S 9/20/2022 9/19/2022 B - Approved as noted Answered
CO S 9/20/2022 9/19/2022 B - Approved as noted Answered
CO SU 9/20/2022 9/19/2022 B - Approved as noted Answered
CF S 9/20/2022 9/19/2022 B - Approved as noted Answered
EC S 9/20/2022 9/19/2022 B - Approved as noted Answered
EC S 9/20/2022 9/19/2022 B - Approved as noted Answered
EC S 9/20/2022 9/19/2022 B - Approved as noted Answered
CF C 9/24/2022 9/19/2022 B - Approved as noted Answered
EC SU 9/20/2022 9/19/2022 B - Approved as noted Answered
CO C 9/24/2022 9/19/2022 B - Approved as noted Answered
CO C 9/20/2022 9/19/2022 B - Approved as noted Answered
CO S 9/20/2022 9/19/2022 B - Approved as noted Answered
CO S 9/20/2022 9/19/2022 B - Approved as noted Answered
CO SU 9/20/2022 9/19/2022 B - Approved as noted Answered
CO SU 9/15/2022 9/14/2022 B - Approved as noted Answered
CO C 9/20/2022 9/19/2022 B - Approved as noted Answered
CO C 9/20/2022 9/19/2022 B - Approved as noted Answered
CO C 9/20/2022 9/19/2022 B - Approved as noted Answered
EC S 9/20/2022 9/19/2022 B - Approved as noted Answered
CO S 9/20/2022 9/19/2022 B - Approved as noted Answered
CO S 9/20/2022 9/19/2022 B - Approved as noted Answered
SW C 9/20/2022 9/19/2022 C - Revise & Resubmit Answered
SW C 9/20/2022 9/19/2022 B - Approved as noted Answered
SW C 9/20/2022 9/19/2022 C - Revise & Resubmit Answered
SW C 9/20/2022 9/19/2022 B - Approved as noted Answered
SW C 9/20/2022 9/19/2022 B - Approved as noted Answered
SW C 9/25/2022 9/19/2022 B - Approved as noted Answered
RG P 9/20/2022 9/19/2022 B - Approved as noted Answered
SW P 9/20/2022 9/19/2022 B - Approved as noted Answered
WG C 9/19/2022 9/18/2022 B - Approved as noted Answered
WG C 9/19/2022 9/18/2022 B - Approved as noted Answered
PT A 9/19/2022 9/18/2022 B - Approved as noted Answered
WG LS 9/26/2022 9/18/2022 B - Approved as noted Answered
WG LS 9/26/2022 9/18/2022 B - Approved as noted Answered
WG LS 9/26/2022 9/18/2022 B - Approved as noted Answered
WG LS 9/26/2022 9/18/2022 B - Approved as noted Answered
WG LS 9/26/2022 9/19/2022 B - Approved as noted Answered
CO A 9/20/2022 9/19/2022 C - Revise & Resubmit Answered
CO A 9/20/2022 9/19/2022 C - Revise & Resubmit Answered
CO A 9/20/2022 9/19/2022 C - Revise & Resubmit Answered
CO A 9/20/2022 9/19/2022 C - Revise & Resubmit Answered
CO A 8/20/2022 8/18/2022 C - Revise & Resubmit Answered
CO A 8/21/2022 8/20/2022 B - Approved as noted Answered
SM S 8/15/2022 8/14/2022 B - Approved as noted Answered
SW C 9/19/2022 9/18/2022 B - Approved as noted Answered
SW C 9/19/2022 9/18/2022 B - Approved as noted Answered
SW C 9/19/2022 9/18/2022 B - Approved as noted Answered
SW C 9/19/2022 9/18/2022 B - Approved as noted Answered
SW C 9/19/2022 9/18/2022 B - Approved as noted Answered
SW C 9/19/2022 9/18/2022 B - Approved as noted Answered
SW C 9/19/2022 9/18/2022 B - Approved as noted Answered
SW C 9/19/2022 9/18/2022 B - Approved as noted Answered
SW C 9/20/2022 9/18/2022 B - Approved as noted Answered
SW C 9/19/2022 9/18/2022 B - Approved as noted Answered
RD C 9/19/2022 9/18/2022 C - Revise & Resubmit Answered
SW LS 9/19/2022 9/18/2022 B - Approved as noted Answered
SW LS 9/19/2022 9/18/2022 A - Approved Answered
SW LS 9/19/2022 9/18/2022 A - Approved Answered
LM S 9/19/2022 9/18/2022 B - Approved as noted Answered
LM S 9/19/2022 9/18/2022 B - Approved as noted Answered
SW C 9/19/2022 9/18/2022 B - Approved as noted Answered
LM SU 9/19/2022 9/18/2022 B - Approved as noted Answered
CO S 9/19/2022 9/18/2022 B - Approved as noted Answered
SW C 9/19/2022 9/18/2022 B - Approved as noted Answered
CO S 9/19/2022 9/18/2022 B - Approved as noted Answered
SW M 9/25/2022 9/18/2022 C - Revise & Resubmit Answered
SW M 9/25/2022 9/18/2022 C - Revise & Resubmit Answered
CO S 9/19/2022 9/18/2022 B - Approved as noted Answered
CO SU 9/19/2022 9/18/2022 B - Approved as noted Answered
CO A 9/19/2022 9/18/2022 B - Approved as noted Answered
RG C 9/19/2022 9/18/2022 B - Approved as noted Answered
CO C 9/19/2022 9/18/2022 B - Approved as noted Answered
CO C 9/19/2022 9/18/2022 A - Approved Answered
EC C 9/19/2022 9/18/2022 B - Approved as noted Answered
EC SU 9/19/2022 9/18/2022 B - Approved as noted Answered
EC S 9/19/2022 9/18/2022 B - Approved as noted Answered
NA C 9/24/2022 9/18/2022 B - Approved as noted Answered
CO S 9/19/2022 9/18/2022 B - Approved as noted Answered
CO S 9/19/2022 9/18/2022 B - Approved as noted Answered
MC S 9/19/2022 9/18/2022 B - Approved as noted Answered
LM S 9/19/2022 9/18/2022 C - Revise & Resubmit Answered
LM SU 9/19/2022 9/18/2022 B - Approved as noted Answered
LM S 9/19/2022 9/18/2022 B - Approved as noted Answered
CO A 9/19/2022 9/18/2022 B - Approved as noted Answered
CO SU 9/19/2022 9/18/2022 B - Approved as noted Answered
CO A 9/5/2022 9/4/2022 B - Approved as noted Answered
CO SU 9/19/2022 9/18/2022 B - Approved as noted Answered
CO S 9/19/2022 9/18/2022 B - Approved as noted Answered
CO S 9/19/2022 9/18/2022 B - Approved as noted Answered
MC S 9/19/2022 9/18/2022 B - Approved as noted Answered
CO S 9/19/2022 9/18/2022 B - Approved as noted Answered
CO A 9/19/2022 9/18/2022 B - Approved as noted Answered
CO S 9/19/2022 9/18/2022 B - Approved as noted Answered
CO S 9/19/2022 9/18/2022 B - Approved as noted Answered
CO S 9/19/2022 9/18/2022 B - Approved as noted Answered
CO S 9/19/2022 9/18/2022 B - Approved as noted Answered
CO S 9/19/2022 9/18/2022 B - Approved as noted Answered
PG C 9/18/2022 9/17/2022 B - Approved as noted Answered
PG C 9/18/2022 9/17/2022 B - Approved as noted Answered
WG A 9/18/2022 9/17/2022 B - Approved as noted Answered
WG A 9/18/2022 9/17/2022 B - Approved as noted Answered
TB SS 9/24/2022 9/17/2022 B - Approved as noted Answered
ZG LS 9/18/2022 9/17/2022 B - Approved as noted Answered
ZG LS 9/18/2022 9/17/2022 B - Approved as noted Answered
AG LS 9/18/2022 9/17/2022 B - Approved as noted Answered
AG LS 9/18/2022 9/17/2022 B - Approved as noted Answered
WG S 9/18/2022 9/17/2022 B - Approved as noted Answered
CO C 9/17/2022 9/15/2022 B - Approved as noted Answered
CO SS 9/18/2022 9/17/2022 B - Approved as noted Answered
MC S 9/14/2022 9/13/2022 B - Approved as noted Answered
CO SU 9/14/2022 9/13/2022 B - Approved as noted Answered
CO SU 9/18/2022 9/17/2022 B - Approved as noted Answered
CO S 9/13/2022 9/12/2022 B - Approved as noted Answered
CO S 9/18/2022 9/17/2022 B - Approved as noted Answered
MC C 9/18/2022 9/17/2022 B - Approved as noted Answered
CO C 9/18/2022 9/17/2022 B - Approved as noted Answered
RG C 9/18/2022 9/17/2022 B - Approved as noted Answered
MC SU 9/18/2022 9/17/2022 B - Approved as noted Answered
MC S 9/18/2022 9/17/2022 B - Approved as noted Answered
MC S 9/18/2022 9/17/2022 B - Approved as noted Answered
CO S 9/18/2022 9/17/2022 B - Approved as noted Answered
CO S 9/18/2022 9/17/2022 B - Approved as noted Answered
CO S 9/21/2022 9/17/2022 C - Revise & Resubmit Answered
CO S 9/18/2022 9/17/2022 B - Approved as noted Answered
CO S 9/18/2022 9/17/2022 B - Approved as noted Answered
VG S 9/18/2022 9/17/2022 B - Approved as noted Answered
CO S 9/1/2022 8/31/2022 C - Revise & Resubmit Answered
SW C 9/18/2022 9/17/2022 B - Approved as noted Answered
SW C 9/19/2022 9/18/2022 B - Approved as noted Answered
SW C 9/18/2022 9/17/2022 B - Approved as noted Answered
SW C 9/18/2022 9/17/2022 B - Approved as noted Answered
SW C 9/18/2022 9/17/2022 B - Approved as noted Answered
SW C 9/18/2022 9/17/2022 C - Revise & Resubmit Answered
SW C 9/18/2022 9/17/2022 B - Approved as noted Answered
SW C 9/18/2022 9/17/2022 B - Approved as noted Answered
SW C 10/19/2022 9/17/2022 B - Approved as noted Answered
SW C 9/18/2022 9/17/2022 C - Revise & Resubmit Answered
SW C 9/18/2022 9/17/2022 B - Approved as noted Answered
SW C 9/18/2022 9/17/2022 C - Revise & Resubmit Answered
CO S 9/17/2022 9/15/2022 B - Approved as noted Answered
CO S 9/17/2022 9/15/2022 B - Approved as noted Answered
CO S 9/17/2022 9/15/2022 B - Approved as noted Answered
CO SU 9/17/2022 9/15/2022 B - Approved as noted Answered
PC S 9/17/2022 9/15/2022 B - Approved as noted Answered
PC S 9/17/2022 9/15/2022 B - Approved as noted Answered
CO C 9/17/2022 9/15/2022 C - Revise & Resubmit Answered
EC S 9/20/2022 9/15/2022 B - Approved as noted Answered
EC S 9/17/2022 9/15/2022 B - Approved as noted Answered
EC S 9/17/2022 9/15/2022 B - Approved as noted Answered
CO S 9/17/2022 9/15/2022 B - Approved as noted Answered
CO SU 9/17/2022 9/15/2022 B - Approved as noted Answered
LM S 9/17/2022 9/15/2022 B - Approved as noted Answered
CO S 9/17/2022 9/15/2022 B - Approved as noted Answered
LM S 9/17/2022 9/15/2022 B - Approved as noted Answered
CO S 9/17/2022 9/15/2022 B - Approved as noted Answered
CO S 9/17/2022 9/15/2022 B - Approved as noted Answered
CO S 9/17/2022 9/15/2022 B - Approved as noted Answered
VG S 9/17/2022 9/15/2022 B - Approved as noted Answered
CO S 9/18/2022 9/17/2022 B - Approved as noted Answered
VG S 9/17/2022 9/15/2022 B - Approved as noted Answered
LM SU 9/17/2022 9/15/2022 B - Approved as noted Answered
CO S 9/17/2022 9/15/2022 B - Approved as noted Answered
CO C 9/15/2022 9/14/2022 B - Approved as noted Answered
CO S 9/15/2022 9/14/2022 B - Approved as noted Answered
CO S 9/19/2022 9/14/2022 B - Approved as noted Answered
CO SS 9/15/2022 9/14/2022 B - Approved as noted Answered
CO S 9/15/2022 9/14/2022 B - Approved as noted Answered
CO S 9/15/2022 9/14/2022 B - Approved as noted Answered
CO SU 9/15/2022 9/14/2022 B - Approved as noted Answered
CO SS 9/15/2022 9/14/2022 B - Approved as noted Answered
CO S 9/15/2022 9/14/2022 B - Approved as noted Answered
MC S 9/15/2022 9/14/2022 B - Approved as noted Answered
CO SU 9/15/2022 9/14/2022 B - Approved as noted Answered
RG C 9/15/2022 9/14/2022 B - Approved as noted Answered
CO S 9/15/2022 9/14/2022 B - Approved as noted Answered
CO A 9/15/2022 9/14/2022 B - Approved as noted Answered
CO S 9/15/2022 9/14/2022 B - Approved as noted Answered
CO S 9/19/2022 9/14/2022 B - Approved as noted Answered
CO S 9/18/2022 9/14/2022 B - Approved as noted Answered
CO S 9/15/2022 9/14/2022 B - Approved as noted Answered
MC C 9/15/2022 9/14/2022 B - Approved as noted Answered
CO A 9/15/2022 9/14/2022 B - Approved as noted Answered
WG C 9/17/2022 9/15/2022 B - Approved as noted Answered
CO C 9/15/2022 9/14/2022 B - Approved as noted Answered
WG C 9/17/2022 9/15/2022 B - Approved as noted Answered
EC S 9/15/2022 9/14/2022 B - Approved as noted Answered
WG C 9/17/2022 9/15/2022 B - Approved as noted Answered
WG C 9/17/2022 9/15/2022 B - Approved as noted Answered
EC S 9/15/2022 9/14/2022 B - Approved as noted Answered
WG C 9/17/2022 9/15/2022 B - Approved as noted Answered
PG C 9/17/2022 9/15/2022 B - Approved as noted Answered
WG SU 9/17/2022 9/15/2022 B - Approved as noted Answered
MC S 9/15/2022 9/14/2022 B - Approved as noted Answered
TB SU 9/17/2022 9/15/2022 B - Approved as noted Answered
MC S 9/15/2022 9/14/2022 B - Approved as noted Answered
MC S 9/15/2022 9/14/2022 B - Approved as noted Answered
CO C 9/15/2022 9/14/2022 B - Approved as noted Answered
TT A 9/17/2022 9/15/2022 B - Approved as noted Answered
WG A 9/17/2022 9/15/2022 B - Approved as noted Answered
WG A 9/17/2022 9/15/2022 B - Approved as noted Answered
PT A 9/17/2022 9/15/2022 B - Approved as noted Answered
MC S 9/15/2022 9/14/2022 B - Approved as noted Answered
CO A 9/15/2022 9/14/2022 B - Approved as noted Answered
TB S 9/17/2022 9/15/2022 B - Approved as noted Answered
CO S 9/19/2022 9/14/2022 B - Approved as noted Answered
WG S 9/20/2022 9/15/2022 B - Approved as noted Answered
SW C 9/17/2022 9/15/2022 C - Revise & Resubmit Answered
SW C 9/17/2022 9/15/2022 B - Approved as noted Answered
SW C 9/17/2022 9/15/2022 B - Approved as noted Answered
SW C 9/17/2022 9/15/2022 B - Approved as noted Answered
SW C 9/17/2022 9/15/2022 B - Approved as noted Answered
SW C 9/17/2022 9/15/2022 C - Revise & Resubmit Answered
SW C 9/17/2022 9/15/2022 B - Approved as noted Answered
SW C 9/17/2022 9/15/2022 B - Approved as noted Answered
SW C 9/17/2022 9/15/2022 B - Approved as noted Answered
SW C 9/17/2022 9/15/2022 B - Approved as noted Answered
SW C 9/17/2022 9/15/2022 B - Approved as noted Answered
SW C 9/17/2022 9/15/2022 B - Approved as noted Answered
SW C 9/17/2022 9/15/2022 B - Approved as noted Answered
SW C 9/17/2022 9/15/2022 B - Approved as noted Answered
SW C 9/17/2022 9/15/2022 B - Approved as noted Answered
AG SU 9/15/2022 9/14/2022 B - Approved as noted Answered
AG SU 9/15/2022 9/14/2022 B - Approved as noted Answered
AG LS 9/15/2022 9/14/2022 B - Approved as noted Answered
AG LS 9/15/2022 9/14/2022 B - Approved as noted Answered
WG A 9/15/2022 9/14/2022 B - Approved as noted Answered
MB A 9/15/2022 9/14/2022 B - Approved as noted Answered
WG A 9/15/2022 9/14/2022 B - Approved as noted Answered
WG C 9/19/2022 9/14/2022 B - Approved as noted Answered
WG C 9/19/2022 9/14/2022 B - Approved as noted Answered
PG C 9/15/2022 9/14/2022 B - Approved as noted Answered
WG C 9/15/2022 9/14/2022 C - Revise & Resubmit Answered
WG C 9/15/2022 9/14/2022 C - Revise & Resubmit Answered
SW C 9/15/2022 9/14/2022 B - Approved as noted Answered
SW P 9/15/2022 9/14/2022 B - Approved as noted Answered
SW P 9/15/2022 9/14/2022 B - Approved as noted Answered
CO C 9/8/2022 9/7/2022 B - Approved as noted Answered
SW C 8/16/2022 8/15/2022 B - Approved as noted Answered
CF S 8/17/2022 8/16/2022 B - Approved as noted Answered
VG C 7/20/2022 7/19/2022 B - Approved as noted Answered
LM S 9/14/2022 9/13/2022 B - Approved as noted Answered
CO SU 9/14/2022 9/13/2022 B - Approved as noted Answered
CO S 9/14/2022 9/13/2022 B - Approved as noted Answered
SW C 9/6/2022 9/5/2022 B - Approved as noted Answered
CO S 9/14/2022 9/13/2022 B - Approved as noted Answered
CO S 9/14/2022 9/13/2022 B - Approved as noted Answered
MC S 9/14/2022 9/13/2022 B - Approved as noted Answered
CO S 9/14/2022 9/13/2022 A - Approved Answered
CO SU 9/14/2022 9/13/2022 B - Approved as noted Answered
CO S 9/14/2022 9/13/2022 B - Approved as noted Answered
CO S 9/14/2022 9/13/2022 B - Approved as noted Answered
LM S 9/18/2022 9/13/2022 B - Approved as noted Answered
MC SU 9/14/2022 9/13/2022 B - Approved as noted Answered
CO SU 9/14/2022 9/13/2022 B - Approved as noted Answered
CO SU 9/14/2022 9/13/2022 B - Approved as noted Answered
MC S 9/14/2022 9/13/2022 B - Approved as noted Answered
WG C 9/14/2022 9/13/2022 B - Approved as noted Answered
CO S 9/14/2022 9/13/2022 B - Approved as noted Answered
WG C 9/14/2022 9/13/2022 B - Approved as noted Answered
WG C 9/14/2022 9/13/2022 B - Approved as noted Answered
CO A 9/14/2022 9/13/2022 B - Approved as noted Answered
WG C 9/14/2022 9/13/2022 B - Approved as noted Answered
PG C 9/14/2022 9/13/2022 B - Approved as noted Answered
VG S 9/14/2022 9/13/2022 B - Approved as noted Answered
CO S 9/14/2022 9/13/2022 B - Approved as noted Answered
SW C 9/15/2022 9/14/2022 B - Approved as noted Answered
SW C 9/15/2022 9/14/2022 B - Approved as noted Answered
SW C 9/18/2022 9/14/2022 B - Approved as noted Answered
SW C 9/15/2022 9/14/2022 B - Approved as noted Answered
CF S 8/20/2022 8/18/2022 B - Approved as noted Answered
SW C 9/15/2022 9/14/2022 B - Approved as noted Answered
CO S 9/14/2022 9/13/2022 B - Approved as noted Answered
SW C 9/15/2022 9/14/2022 B - Approved as noted Answered
SW C 9/15/2022 9/14/2022 B - Approved as noted Answered
SW C 9/15/2022 9/14/2022 B - Approved as noted Answered
SW C 9/15/2022 9/14/2022 B - Approved as noted Answered
SW C 9/15/2022 9/14/2022 B - Approved as noted Answered
SW C 9/15/2022 9/14/2022 B - Approved as noted Answered
SW C 9/15/2022 9/14/2022 B - Approved as noted Answered
SW C 9/15/2022 9/14/2022 B - Approved as noted Answered
PC E 9/18/2022 9/14/2022 B - Approved as noted Answered
PG C 9/14/2022 9/13/2022 B - Approved as noted Answered
SW C 9/15/2022 9/14/2022 B - Approved as noted Answered
SW C 9/15/2022 9/14/2022 B - Approved as noted Answered
WG C 9/14/2022 9/13/2022 B - Approved as noted Answered
SW C 9/15/2022 9/14/2022 B - Approved as noted Answered
SW E 9/18/2022 9/14/2022 B - Approved as noted Answered
PC LC 9/15/2022 9/14/2022 B - Approved as noted Answered
PC LC 9/15/2022 9/14/2022 B - Approved as noted Answered
CF S 8/20/2022 8/18/2022 B - Approved as noted Answered
CF S 8/20/2022 8/18/2022 B - Approved as noted Answered
WG C 9/14/2022 9/13/2022 B - Approved as noted Answered
WG C 9/14/2022 9/13/2022 B - Approved as noted Answered
AG LS 9/14/2022 9/13/2022 B - Approved as noted Answered
AG LS 9/14/2022 9/13/2022 B - Approved as noted Answered
EC S 9/14/2022 9/13/2022 B - Approved as noted Answered
WG S 9/14/2022 9/13/2022 C - Revise & Resubmit Answered
WG S 9/14/2022 9/13/2022 C - Revise & Resubmit Answered
LM LC 9/14/2022 9/13/2022 B - Approved as noted Answered
CC M 9/15/2022 9/14/2022 C - Revise & Resubmit Answered
CO C 8/16/2022 8/15/2022 B - Approved as noted Answered
MC S 9/14/2022 9/13/2022 B - Approved as noted Answered
CO SS 9/14/2022 9/13/2022 B - Approved as noted Answered
CO SU 9/14/2022 9/13/2022 B - Approved as noted Answered
CO S 9/14/2022 9/13/2022 B - Approved as noted Answered
CO S 9/14/2022 9/13/2022 B - Approved as noted Answered
CO S 9/14/2022 9/13/2022 B - Approved as noted Answered
SW C 9/14/2022 9/13/2022 B - Approved as noted Answered
SW C 9/14/2022 9/13/2022 B - Approved as noted Answered
SW C 9/14/2022 9/13/2022 B - Approved as noted Answered
SW C 9/14/2022 9/13/2022 B - Approved as noted Answered
SW C 9/14/2022 9/13/2022 B - Approved as noted Answered
SW C 9/14/2022 9/13/2022 B - Approved as noted Answered
SW C 9/14/2022 9/13/2022 B - Approved as noted Answered
SW C 9/14/2022 9/13/2022 B - Approved as noted Answered
SW C 9/14/2022 10/13/2022 B - Approved as noted Answered
SW C 9/14/2022 9/13/2022 B - Approved as noted Answered
SW C 9/14/2022 9/13/2022 B - Approved as noted Answered
SW C 9/14/2022 9/13/2022 B - Approved as noted Answered
SW C 9/14/2022 9/13/2022 B - Approved as noted Answered
SW C 9/14/2022 9/13/2022 B - Approved as noted Answered
SW C 9/14/2022 9/13/2022 B - Approved as noted Answered
SW C 10/19/2022 9/13/2022 B - Approved as noted Answered
SW C 9/14/2022 9/13/2022 B - Approved as noted Answered
SW C 9/14/2022 9/13/2022 B - Approved as noted Answered
SW C 9/14/2022 9/13/2022 B - Approved as noted Answered
SW C 9/14/2022 9/13/2022 B - Approved as noted Answered
SW C 9/14/2022 9/13/2022 B - Approved as noted Answered
CO S 9/13/2022 9/12/2022 B - Approved as noted Answered
CO S 9/13/2022 9/12/2022 B - Approved as noted Answered
MC C 9/13/2022 9/12/2022 B - Approved as noted Answered
CO C 9/13/2022 9/12/2022 B - Approved as noted Answered
MC S 9/13/2022 9/12/2022 B - Approved as noted Answered
CO C 9/13/2022 9/12/2022 B - Approved as noted Answered
MC S 9/13/2022 9/12/2022 B - Approved as noted Answered
MC SU 9/13/2022 9/12/2022 B - Approved as noted Answered
CO S 9/13/2022 9/12/2022 B - Approved as noted Answered
CO A 9/13/2022 9/12/2022 B - Approved as noted Answered
CO S 9/13/2022 9/12/2022 B - Approved as noted Answered
CO S 9/13/2022 9/12/2022 B - Approved as noted Answered
CO S 9/13/2022 9/12/2022 B - Approved as noted Answered
CO S 9/13/2022 9/12/2022 B - Approved as noted Answered
RG C 9/13/2022 9/17/2022 B - Approved as noted Answered
CO S 9/13/2022 9/12/2022 B - Approved as noted Answered
RG C 9/14/2022 9/13/2022 B - Approved as noted Answered
CO S 9/10/2022 9/8/2022 B - Approved as noted Answered
CO S 9/13/2022 9/12/2022 B - Approved as noted Answered
CO S 8/10/2022 8/9/2022 B - Approved as noted Answered
CO A 9/12/2022 9/11/2022 B - Approved as noted Answered
CO A 9/12/2022 9/11/2022 B - Approved as noted Answered
MC S 9/13/2022 9/12/2022 B - Approved as noted Answered
MB A 9/13/2022 9/12/2022 B - Approved as noted Answered
WG LS 9/13/2022 9/12/2022 B - Approved as noted Answered
WG LS 9/13/2022 9/12/2022 B - Approved as noted Answered
WG C 9/13/2022 9/12/2022 C - Revise & Resubmit Answered
WG C 9/13/2022 9/12/2022 C - Revise & Resubmit Answered
SW C 9/13/2022 9/12/2022 B - Approved as noted Answered
WG C 9/13/2022 9/12/2022 B - Approved as noted Answered
TB SU 9/13/2022 9/13/2022 B - Approved as noted Answered
WG SU 9/13/2022 9/12/2022 B - Approved as noted Answered
TB S 9/13/2022 9/12/2022 B - Approved as noted Answered
WG S 9/13/2022 9/12/2022 B - Approved as noted Answered
WG S 9/14/2022 9/12/2022 B - Approved as noted Answered
TT LC 9/13/2022 9/12/2022 B - Approved as noted Answered
TB LC 9/13/2022 9/12/2022 B - Approved as noted Answered
TB E 9/13/2022 9/12/2022 B - Approved as noted Answered
SW E 9/13/2022 9/12/2022 B - Approved as noted Answered
SW E 9/13/2022 9/12/2022 B - Approved as noted Answered
SW E 9/13/2022 9/12/2022 B - Approved as noted Answered
SW E 9/13/2022 9/12/2022 B - Approved as noted Answered
SW C 9/13/2022 9/17/2022 B - Approved as noted Answered
SW C 9/13/2022 9/12/2022 C - Revise & Resubmit Answered
SW C 9/13/2022 9/12/2022 B - Approved as noted Answered
SW C 9/13/2022 10/1/2022 B - Approved as noted Answered
SW C 9/13/2022 10/2/2022 B - Approved as noted Answered
SW C 9/13/2022 9/12/2022 B - Approved as noted Answered
SW C 9/13/2022 9/12/2022 B - Approved as noted Answered
SW C 9/17/2022 9/12/2022 B - Approved as noted Answered
SW C 9/13/2022 9/12/2022 B - Approved as noted Answered
SW C 9/13/2022 9/12/2022 B - Approved as noted Answered
SW C 9/13/2022 9/12/2022 B - Approved as noted Answered
SW C 9/13/2022 9/12/2022 B - Approved as noted Answered
SW C 9/13/2022 9/12/2022 B - Approved as noted Answered
SW C 9/13/2022 9/12/2022 B - Approved as noted Answered
SW C 9/13/2022 9/12/2022 B - Approved as noted Answered
SW C 9/13/2022 9/12/2022 B - Approved as noted Answered
SW C 9/13/2022 9/12/2022 B - Approved as noted Answered
SW C 9/13/2022 9/12/2022 B - Approved as noted Answered
SW C 9/13/2022 9/12/2022 B - Approved as noted Answered
SW C 9/13/2022 9/12/2022 B - Approved as noted Answered
SW C 9/13/2022 9/12/2022 B - Approved as noted Answered
SW C 9/13/2022 9/12/2022 B - Approved as noted Answered
SW C 9/13/2022 9/12/2022 B - Approved as noted Answered
SW C 9/13/2022 9/12/2022 B - Approved as noted Answered
SW C 9/13/2022 10/12/2022 B - Approved as noted Answered
SW C 9/13/2022 9/12/2022 B - Approved as noted Answered
SW C 9/13/2022 9/12/2022 B - Approved as noted Answered
SW C 9/13/2022 9/12/2022 B - Approved as noted Answered
SW C 9/13/2022 9/12/2022 B - Approved as noted Answered
SW C 9/13/2022 9/12/2022 B - Approved as noted Answered
SW C 9/13/2022 9/17/2022 B - Approved as noted Answered
SW C 9/13/2022 9/12/2022 B - Approved as noted Answered
SW E 9/12/2022 9/11/2022 B - Approved as noted Answered
SW E 9/12/2022 9/11/2022 B - Approved as noted Answered
SW E 9/12/2022 9/11/2022 B - Approved as noted Answered
SW E 9/12/2022 9/11/2022 B - Approved as noted Answered
SW E 9/12/2022 9/11/2022 B - Approved as noted Answered
SW E 9/12/2022 9/11/2022 B - Approved as noted Answered
MB E 9/10/2022 9/8/2022 B - Approved as noted Answered
MC S 9/8/2022 9/7/2022 B - Approved as noted Answered
CO S 9/12/2022 9/11/2022 B - Approved as noted Answered
MC S 9/12/2022 9/11/2022 B - Approved as noted Answered
RG C 9/12/2022 9/11/2022 B - Approved as noted Answered
MC C 9/12/2022 9/12/2022 B - Approved as noted Answered
VG S 9/12/2022 9/11/2022 B - Approved as noted Answered
MC S 9/12/2022 9/11/2022 B - Approved as noted Answered
MC S 9/12/2022 9/11/2022 B - Approved as noted Answered
CO C 9/12/2022 9/11/2022 B - Approved as noted Answered
CO S 9/15/2022 9/11/2022 B - Approved as noted Answered
CO C 9/12/2022 9/11/2022 B - Approved as noted Answered
CO A 9/12/2022 9/11/2022 B - Approved as noted Answered
CO A 9/12/2022 9/11/2022 B - Approved as noted Answered
CO S 9/12/2022 9/11/2022 C - Revise & Resubmit Answered
SW P 9/12/2022 9/11/2022 B - Approved as noted Answered
SW P 9/12/2022 9/11/2022 B - Approved as noted Answered
CF P 9/13/2022 9/12/2022 B - Approved as noted Answered
SW C 9/12/2022 9/11/2022 B - Approved as noted Answered
SW C 9/12/2022 9/11/2022 B - Approved as noted Answered
SW C 9/12/2022 9/11/2022 B - Approved as noted Answered
SW C 9/12/2022 9/11/2022 B - Approved as noted Answered
SW C 9/12/2022 9/11/2022 B - Approved as noted Answered
SW C 9/12/2022 9/11/2022 B - Approved as noted Answered
SW C 9/12/2022 9/11/2022 B - Approved as noted Answered
SW C 9/12/2022 9/11/2022 B - Approved as noted Answered
SW C 9/12/2022 9/11/2022 B - Approved as noted Answered
SW C 9/12/2022 9/11/2022 B - Approved as noted Answered
SW C 9/12/2022 9/11/2022 B - Approved as noted Answered
SW C 9/12/2022 9/11/2022 B - Approved as noted Answered
SW C 9/12/2022 9/11/2022 B - Approved as noted Answered
SW C 9/12/2022 9/11/2022 B - Approved as noted Answered
SW C 9/12/2022 9/11/2022 B - Approved as noted Answered
SW C 9/12/2022 9/11/2022 B - Approved as noted Answered
SW C 9/12/2022 9/11/2022 B - Approved as noted Answered
SW C 9/12/2022 9/11/2022 B - Approved as noted Answered
SW C 9/12/2022 9/11/2022 B - Approved as noted Answered
SW C 9/12/2022 9/11/2022 B - Approved as noted Answered
SW C 9/12/2022 9/11/2022 B - Approved as noted Answered
SW C 9/12/2022 9/11/2022 B - Approved as noted Answered
SW C 9/12/2022 9/11/2022 B - Approved as noted Answered
SW C 9/12/2022 9/11/2022 B - Approved as noted Answered
SW C 9/12/2022 9/11/2022 B - Approved as noted Answered
SW C 9/12/2022 9/11/2022 B - Approved as noted Answered
WG LS 9/13/2022 9/12/2022 B - Approved as noted Answered
WG LS 9/14/2022 9/11/2022 B - Approved as noted Answered
SW C 9/12/2022 9/11/2022 B - Approved as noted Answered
WG C 9/12/2022 9/11/2022 B - Approved as noted Answered
PG C 9/12/2022 9/11/2022 B - Approved as noted Answered
PG C 9/12/2022 9/11/2022 B - Approved as noted Answered
PG C 9/12/2022 9/11/2022 B - Approved as noted Answered
TG S 9/15/2022 9/11/2022 B - Approved as noted Answered
TG S 9/12/2022 9/11/2022 B - Approved as noted Answered
WG S 9/12/2022 9/11/2022 B - Approved as noted Answered
EC S 9/12/2022 9/11/2022 B - Approved as noted Answered
CO S 9/12/2022 9/11/2022 B - Approved as noted Answered
EC SU 9/12/2022 9/11/2022 B - Approved as noted Answered
CO S 9/12/2022 9/11/2022 B - Approved as noted Answered
CO S 9/12/2022 9/11/2022 B - Approved as noted Answered
CO A 9/12/2022 9/11/2022 B - Approved as noted Answered
CO A 9/12/2022 9/11/2022 B - Approved as noted Answered
CO SU 9/12/2022 9/11/2022 B - Approved as noted Answered
CO S 9/12/2022 9/11/2022 B - Approved as noted Answered
CO S 9/12/2022 9/11/2022 B - Approved as noted Answered
CO S 9/12/2022 9/11/2022 B - Approved as noted Answered
CO A 9/12/2022 9/11/2022 B - Approved as noted Answered
CO C 9/12/2022 9/11/2022 B - Approved as noted Answered
CO S 9/12/2022 9/11/2022 B - Approved as noted Answered
CO SU 9/11/2022 9/11/2022 B - Approved as noted Answered
CO S 9/11/2022 9/11/2022 C - Revise & Resubmit Answered
CO S 9/11/2022 9/11/2022 B - Approved as noted Answered
SW C 9/12/2022 9/11/2022 B - Approved as noted Answered
CO S 9/11/2022 9/11/2022 B - Approved as noted Answered
SW C 9/12/2022 9/11/2022 B - Approved as noted Answered
CO S 9/12/2022 9/11/2022 B - Approved as noted Answered
CO S 9/12/2022 9/11/2022 B - Approved as noted Answered
CO S 9/12/2022 9/11/2022 B - Approved as noted Answered
CO S 9/12/2022 9/11/2022 B - Approved as noted Answered
CO S 9/12/2022 9/11/2022 C - Revise & Resubmit Answered
CO S 9/12/2022 9/11/2022 B - Approved as noted Answered
CO C 9/5/2022 9/4/2022 B - Approved as noted Answered
TB E 9/10/2022 9/8/2022 B - Approved as noted Answered
PC E 9/10/2022 9/8/2022 C - Revise & Resubmit Answered
PC E 9/10/2022 9/8/2022 B - Approved as noted Answered
CO SS 9/11/2022 9/10/2022 B - Approved as noted Answered
SW LS 9/11/2022 9/10/2022 B - Approved as noted Answered
SW LS 9/11/2022 9/10/2022 B - Approved as noted Answered
SW LS 9/11/2022 9/10/2022 B - Approved as noted Answered
SW LS 9/11/2022 9/10/2022 B - Approved as noted Answered
SW LS 9/11/2022 9/10/2022 B - Approved as noted Answered
SW LS 9/11/2022 9/10/2022 B - Approved as noted Answered
SW C 9/11/2022 9/10/2022 B - Approved as noted Answered
SW C 9/11/2022 9/10/2022 B - Approved as noted Answered
SW C 9/11/2022 9/10/2022 B - Approved as noted Answered
SW C 9/11/2022 9/10/2022 B - Approved as noted Answered
SW C 9/11/2022 9/10/2022 B - Approved as noted Answered
SW C 9/11/2022 9/10/2022 B - Approved as noted Answered
SW C 9/11/2022 9/10/2022 B - Approved as noted Answered
SW C 9/14/2022 9/10/2022 B - Approved as noted Answered
SW C 9/14/2022 9/10/2022 B - Approved as noted Answered
SW C 9/11/2022 9/10/2022 B - Approved as noted Answered
SW C 9/11/2022 9/10/2022 B - Approved as noted Answered
SW C 9/11/2022 9/10/2022 B - Approved as noted Answered
SW C 9/10/2022 9/8/2022 B - Approved as noted Answered
SW C 9/10/2022 9/8/2022 B - Approved as noted Answered
SW C 9/10/2022 9/8/2022 B - Approved as noted Answered
SW C 9/10/2022 9/8/2022 B - Approved as noted Answered
SW C 9/10/2022 9/8/2022 B - Approved as noted Answered
SW C 9/10/2022 9/8/2022 B - Approved as noted Answered
SW C 9/10/2022 9/8/2022 B - Approved as noted Answered
SW C 9/10/2022 9/8/2022 B - Approved as noted Answered
SW C 9/10/2022 9/8/2022 B - Approved as noted Answered
SW C 9/10/2022 9/8/2022 B - Approved as noted Answered
CO S 9/7/2022 9/6/2022 B - Approved as noted Answered
CO S 9/7/2022 9/6/2022 B - Approved as noted Answered
CO S 9/7/2022 9/6/2022 B - Approved as noted Answered
MC SU 9/7/2022 9/6/2022 B - Approved as noted Answered
RG SU 9/11/2022 9/10/2022 B - Approved as noted Answered
CO S 9/11/2022 9/10/2022 B - Approved as noted Answered
CO S 9/11/2022 9/10/2022 B - Approved as noted Answered
CO SU 9/11/2022 9/10/2022 B - Approved as noted Answered
SW C 9/10/2022 9/8/2022 B - Approved as noted Answered
CO SU 9/11/2022 9/10/2022 B - Approved as noted Answered
CO S 9/11/2022 9/10/2022 B - Approved as noted Answered
EC S 9/11/2022 9/10/2022 B - Approved as noted Answered
CO S 9/11/2022 9/10/2022 B - Approved as noted Answered
TG S 9/11/2022 9/10/2022 B - Approved as noted Answered
CO S 9/11/2022 9/10/2022 B - Approved as noted Answered
AG C 9/11/2022 9/10/2022 B - Approved as noted Answered
CO S 9/11/2022 9/10/2022 B - Approved as noted Answered
WG C 9/11/2022 9/10/2022 B - Approved as noted Answered
CO S 9/11/2022 9/10/2022 B - Approved as noted Answered
WG C 9/11/2022 9/10/2022 B - Approved as noted Answered
CO S 9/11/2022 9/10/2022 B - Approved as noted Answered
WG C 9/11/2022 9/10/2022 B - Approved as noted Answered
CO SU 9/11/2022 9/10/2022 B - Approved as noted Answered
SW C 9/11/2022 9/10/2022 B - Approved as noted Answered
CO S 9/11/2022 9/10/2022 B - Approved as noted Answered
EC C 9/11/2022 9/10/2022 B - Approved as noted Answered
PG C 9/11/2022 9/10/2022 B - Approved as noted Answered
PG C 9/11/2022 9/10/2022 B - Approved as noted Answered
PG C 9/11/2022 9/10/2022 B - Approved as noted Answered
CO S 9/11/2022 9/10/2022 B - Approved as noted Answered
CO S 9/11/2022 9/10/2022 B - Approved as noted Answered
CO SU 9/11/2022 9/10/2022 B - Approved as noted Answered
MC S 9/11/2022 9/10/2022 B - Approved as noted Answered
MC S 9/11/2022 9/10/2022 B - Approved as noted Answered
MC S 9/11/2022 9/10/2022 B - Approved as noted Answered
MC SU 9/11/2022 9/10/2022 B - Approved as noted Answered
MC C 9/11/2022 9/10/2022 B - Approved as noted Answered
CO C 9/6/2022 9/5/2022 B - Approved as noted Answered
PG C 9/10/2022 9/8/2022 B - Approved as noted Answered
PG C 9/10/2022 9/8/2022 B - Approved as noted Answered
TB S 9/10/2022 9/8/2022 B - Approved as noted Answered
EC S 9/10/2022 9/8/2022 B - Approved as noted Answered
WG S 9/10/2022 9/8/2022 B - Approved as noted Answered
TB SU 9/10/2022 9/8/2022 B - Approved as noted Answered
TB SU 9/10/2022 9/8/2022 B - Approved as noted Answered
WG SU 9/10/2022 9/8/2022 B - Approved as noted Answered
WG C 9/10/2022 9/8/2022 B - Approved as noted Answered
AG C 9/10/2022 9/8/2022 B - Approved as noted Answered
AG C 9/10/2022 9/8/2022 B - Approved as noted Answered
SW C 9/10/2022 9/8/2022 B - Approved as noted Answered
SW C 9/10/2022 9/8/2022 B - Approved as noted Answered
WG C 9/10/2022 9/8/2022 B - Approved as noted Answered
ZG C 9/10/2022 9/8/2022 B - Approved as noted Answered
CO SU 9/10/2022 9/8/2022 B - Approved as noted Answered
CO S 9/10/2022 9/8/2022 B - Approved as noted Answered
CO S 9/10/2022 9/8/2022 B - Approved as noted Answered
VG S 9/10/2022 9/8/2022 B - Approved as noted Answered
VG S 9/10/2022 9/8/2022 B - Approved as noted Answered
VG S 9/10/2022 9/8/2022 B - Approved as noted Answered
VG SU 9/10/2022 9/8/2022 B - Approved as noted Answered
VG SU 9/10/2022 9/8/2022 B - Approved as noted Answered
CO C 9/10/2022 9/8/2022 B - Approved as noted Answered
CO C 9/10/2022 9/8/2022 B - Approved as noted Answered
RG C 9/10/2022 9/8/2022 B - Approved as noted Answered
MC C 9/10/2022 9/8/2022 B - Approved as noted Answered
CO SU 9/10/2022 9/8/2022 B - Approved as noted Answered
CO S 9/10/2022 9/8/2022 B - Approved as noted Answered
MC SU 9/10/2022 9/8/2022 B - Approved as noted Answered
MC S 9/10/2022 9/8/2022 B - Approved as noted Answered
MC S 9/10/2022 9/8/2022 B - Approved as noted Answered
CO S 9/10/2022 9/8/2022 C - Revise & Resubmit Answered
CO A 9/10/2022 9/8/2022 C - Revise & Resubmit Answered
NA C 9/10/2022 9/8/2022 C - Revise & Resubmit Answered
CO S 9/10/2022 9/8/2022 B - Approved as noted Answered
CO S 9/10/2022 9/8/2022 B - Approved as noted Answered
CO S 9/10/2022 9/8/2022 B - Approved as noted Answered
CO S 9/10/2022 9/8/2022 B - Approved as noted Answered
CO S 9/10/2022 9/8/2022 B - Approved as noted Answered
CO S 9/10/2022 9/8/2022 B - Approved as noted Answered
CO S 9/10/2022 9/8/2022 B - Approved as noted Answered
CO S 9/10/2022 9/8/2022 B - Approved as noted Answered
CO S 9/10/2022 9/8/2022 B - Approved as noted Answered
CO S 9/7/2022 9/6/2022 B - Approved as noted Answered
CO C 9/7/2022 9/6/2022 B - Approved as noted Answered
CO SS 9/7/2022 9/6/2022 B - Approved as noted Answered
CO SS 9/7/2022 9/6/2022 B - Approved as noted Answered
CO SS 9/7/2022 9/6/2022 B - Approved as noted Answered
CO S 9/10/2022 9/8/2022 B - Approved as noted Answered
TT E 9/10/2022 9/7/2022 C - Revise & Resubmit Answered
TT LC 9/8/2022 9/7/2022 B - Approved as noted Answered
TT LC 9/8/2022 9/7/2022 C - Revise & Resubmit Answered
TT LC 9/8/2022 9/7/2022 C - Revise & Resubmit Answered
WG C 9/8/2022 9/7/2022 B - Approved as noted Answered
SW A 9/8/2022 9/7/2022 B - Approved as noted Answered
SW A 9/8/2022 9/7/2022 B - Approved as noted Answered
WG LS 9/14/2022 9/7/2022 B - Approved as noted Answered
WG LS 9/14/2022 9/7/2022 B - Approved as noted Answered
WG LS 9/14/2022 9/7/2022 B - Approved as noted Answered
WG LS 9/14/2022 9/7/2022 B - Approved as noted Answered
PG LS 9/8/2022 9/7/2022 B - Approved as noted Answered
EC S 9/8/2022 9/7/2022 B - Approved as noted Answered
EC S 9/8/2022 9/7/2022 B - Approved as noted Answered
EC S 9/8/2022 9/7/2022 B - Approved as noted Answered
EC SU 9/8/2022 9/7/2022 B - Approved as noted Answered
SW LS 9/8/2022 9/7/2022 B - Approved as noted Answered
SW C 9/8/2022 9/7/2022 B - Approved as noted Answered
SW C 9/8/2022 9/7/2022 B - Approved as noted Answered
SW C 9/8/2022 9/7/2022 B - Approved as noted Answered
SW C 9/8/2022 9/7/2022 B - Approved as noted Answered
SW C 9/8/2022 9/7/2022 B - Approved as noted Answered
SW C 9/8/2022 9/7/2022 B - Approved as noted Answered
SW C 9/8/2022 9/7/2022 B - Approved as noted Answered
SW C 9/8/2022 9/7/2022 B - Approved as noted Answered
SW C 9/8/2022 9/7/2022 B - Approved as noted Answered
SW C 9/8/2022 9/7/2022 B - Approved as noted Answered
SW C 9/8/2022 9/7/2022 B - Approved as noted Answered
SW C 9/8/2022 9/7/2022 B - Approved as noted Answered
SW C 9/11/2022 9/7/2022 B - Approved as noted Answered
SW C 9/8/2022 9/7/2022 B - Approved as noted Answered
SW C 9/8/2022 9/7/2022 B - Approved as noted Answered
SW C 9/6/2022 9/6/2022 B - Approved as noted Answered
EC C 9/12/2022 9/7/2022 B - Approved as noted Answered
CG SU 9/8/2022 9/7/2022 B - Approved as noted Answered
CO S 9/8/2022 9/7/2022 C - Revise & Resubmit Answered
CO S 9/8/2022 9/7/2022 C - Revise & Resubmit Answered
CO SU 9/8/2022 9/7/2022 B - Approved as noted Answered
CO S 9/8/2022 9/7/2022 B - Approved as noted Answered
CO S 9/8/2022 9/7/2022 B - Approved as noted Answered
MC C 9/11/2022 9/7/2022 B - Approved as noted Answered
RG C 9/8/2022 9/7/2022 B - Approved as noted Answered
CO S 9/8/2022 9/7/2022 B - Approved as noted Answered
CO SU 9/8/2022 9/7/2022 B - Approved as noted Answered
CO SU 9/8/2022 9/7/2022 B - Approved as noted Answered
CO SU 9/8/2022 9/7/2022 B - Approved as noted Answered
LM S 9/8/2022 9/7/2022 C - Revise & Resubmit Answered
LM S 9/8/2022 9/7/2022 B - Approved as noted Answered
LM S 9/8/2022 9/7/2022 C - Revise & Resubmit Answered
CO SU 9/8/2022 9/7/2022 B - Approved as noted Answered
LM SU 9/8/2022 9/7/2022 B - Approved as noted Answered
WG C 8/28/2022 8/27/2022 B - Approved as noted Answered
CO SS 8/30/2022 8/29/2022 B - Approved as noted Answered
CO SS 8/30/2022 8/29/2022 B - Approved as noted Answered
AG SS 9/3/2022 9/1/2022 C - Revise & Resubmit Answered
MC SU 9/8/2022 9/7/2022 B - Approved as noted Answered
CO S 9/8/2022 9/7/2022 B - Approved as noted Answered
CO S 9/8/2022 9/7/2022 B - Approved as noted Answered
CO S 9/8/2022 9/7/2022 B - Approved as noted Answered
CO S 9/5/2022 9/4/2022 B - Approved as noted Answered
CO SU 9/5/2022 9/4/2022 B - Approved as noted Answered
VG SU 9/3/2022 9/1/2022 B - Approved as noted Answered
CO S 9/2/2022 9/1/2022 B - Approved as noted Answered
CF C 8/25/2022 8/24/2022 B - Approved as noted Answered
CF C 8/31/2022 8/30/2022 B - Approved as noted Answered
CF S 8/31/2022 8/30/2022 B - Approved as noted Answered
CO S 9/8/2022 9/7/2022 B - Approved as noted Answered
CO S 9/8/2022 9/7/2022 C - Revise & Resubmit Answered
CO S 9/8/2022 9/7/2022 B - Approved as noted Answered
LM S 9/8/2022 9/7/2022 B - Approved as noted Answered
CO SU 9/7/2022 9/6/2022 B - Approved as noted Answered
CF C 9/3/2022 9/1/2022 B - Approved as noted Answered
CO C 9/7/2022 9/6/2022 B - Approved as noted Answered
CO S 9/7/2022 9/6/2022 B - Approved as noted Answered
MC S 9/8/2022 9/7/2022 B - Approved as noted Answered
ZG LC 9/7/2022 9/6/2022 B - Approved as noted Answered
CO S 9/7/2022 9/6/2022 B - Approved as noted Answered
CO S 9/7/2022 9/6/2022 B - Approved as noted Answered
MB LC 9/6/2022 9/5/2022 B - Approved as noted Answered
CO S 9/14/2022 9/13/2022 B - Approved as noted Answered
CO C 9/7/2022 9/6/2022 B - Approved as noted Answered
CO C 9/10/2022 9/6/2022 B - Approved as noted Answered
VG S 9/7/2022 9/6/2022 B - Approved as noted Answered
VG S 9/7/2022 9/6/2022 B - Approved as noted Answered
VG S 9/7/2022 9/6/2022 B - Approved as noted Answered
MC C 9/8/2022 9/7/2022 B - Approved as noted Answered
CO SU 9/7/2022 9/6/2022 B - Approved as noted Answered
CO S 9/7/2022 9/6/2022 B - Approved as noted Answered
CO S 9/10/2022 9/8/2022 B - Approved as noted Answered
CO S 9/7/2022 9/6/2022 C - Revise & Resubmit Answered
CO S 9/7/2022 9/6/2022 B - Approved as noted Answered
CO S 9/7/2022 9/6/202