You are on page 1of 13

Consultant : DAR Al Handasha Discipline : Over All

Main Contractor : ZHBG Rundate : 28-Feb-23

Cancel
led/ Total
Open Code A Code B Code C Code D
Supers Received
eded Sub-Contractor Approval Register (Strc)
0 0 0 1 0 0 1
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
Status Code
Latest Date Approval Average Days Number of
Sl No. Discipline BEC Reference No. Rev. Description Subcontractor / Supplier Date Received Remarks
Rev. Submitted Required By Outstanding Days Held
A B C D

4 Str KAIG-SUB-ZHBG-GN-S-003 0 Prequlification for PTFE & Related Steel Structure Works Obeikan Tensile Structure 04.09.19 18.09.19 12.09.19 8 C

19 06.01.00 44985 ###

Page 1 of 13 M.Sarfraz
Snr. DC
Consultant : DAR Al Handasha Discipline : Over All
Main Contractor : ZHBG Rundate : 28-Feb-23

Cancel
led/ Total
Open Code A Code B Code C Code D
Supers Received
eded Sub-Contractor Approval Register (Steel Strc)
1 0 4 0 0 0 5
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
Status Code
Latest Date Approval Average Days Number of
Sl No. Discipline BEC Reference No. Rev. Description Subcontractor / Supplier Date Received Remarks
Rev. Submitted Required By Outstanding Days Held
A B C D

1 Str. Steel KAIG-SUB-GN-SS-0001 0 L Prequalification for Steel Structur Works Rehiland Arabia LLC 28.03.20 11.04.20 19.04.20 22 B

2 kAIG-SUB-GN-SS-0002 0 L Prequalification for Third Party Inspection Agency Fugro Suhaimi Ltd (FSL) 04.08.20 18.08.20 20.01.21 169 B

Advance Approval Code


3 KAIG-SUB-GN-SS-0006 0 L Prequalification for Third Party Inspection Agency Universal Inspection Co. Ltd 22.03.21 05.04.21 03.06.21 73 B
"B"

4 KAIG-SUB-GN-SS-0007 0 L Prequalification for Steel Structure & Metal Works Al-Ashoury Factory for Power, Telecom & Steel Industry 06.07.22 20.07.22 25.07.22 19 B

5 KAIG-SUB-GN-SS-0008 0 L Prequalification for Steel Structure Aluminium Construction Systems Factory Co. Ltd. 30.10.22 13.11.22

6 13.01.00

7 13.01.00

13.01.00

13.01.00

13.01.00 44985

1 44985

2 44985

3 44985

4 44985

5 44985

6 44985

7 44985

8 06.01.00 44985

9 06.01.00 44985

10 06.01.00 44985 ###

Page 2 of 13 M.Sarfraz
Snr. DC
Consultant : DAR Al Handasha
Main Contractor : ZHBG 28-Feb-23

Open Code A Code B Code C Code D


Sub-Contractor Approval Register (Arch)
0 0 0 1 0
KING ABDULLAH INTERNATIONAL GARDENS PROJECT

Latest Date Approval


Sl No. Discipline BEC Reference No. Rev. Description Subcontractor / Supplier Date Received Remarks
Rev. Submitted Required By

KAIG3-SUB-GN-A-0036-00 0 L Sub-Contractor Approval for Wooden door works BEAUTY DESIGN COMPANY FOR WOOD ( BDCO ) 26.10.22 09.11.22 31.10.22

Page 3 of 13 M.Sarfraz
Snr. DC
Consultant : DAR Al Handasha Discipline : Over All
Main Contractor : ZHBG Rundate : 28-Feb-23

Cancel
led/ Total
Open Code A Code B Code C Code D
Supers Received
eded Sub-Contractor Approval Register (CIVIL)
0 0 0 1 0 0 1
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
Status Code
Latest Date Approval Average Days Number of
Sl No. Discipline BEC Reference No. Rev. Description Subcontractor / Supplier Date Received Remarks
Rev. Submitted Required By Outstanding Days Held
A B C D

5 CIVIL KAIG-SUB-GN-C-0006 0 Prequlification for Anti Termite Work Tal-Alssawan for Agriculture and Insections Fighting Co. 10.11.19 24.11.19 19.11.19 9 C

06.01.00 44985 ###

Page 4 of 13 M.Sarfraz
Snr. DC
Consultant : DAR Al Handasha Discipline : Over All
Main Contractor : ZHBG Rundate : 28-Feb-23

Cancel
led/ Total
Open Code A Code B Code C Code D
Supers Received
eded Sub-Contractor Approval Register
0 0 0 1 0 0 1
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
Status Code
Date Approval Average Days Number of
Sl No. Discipline BEC Reference No. Rev. Latest Description Subcontractor / Supplier Date Received Remarks
Submitted Required By Outstanding Days Held
A B C D

Subcontractor Approval for Stone Works and Cladding & Decoration &
KAIG3-SUB-GN-G-0025 0 L DHEL Alnakheel Contracting 08.04.21 15.04.21 14.04.21 6 C
Granite & Tiling & Paving and Faux Rock & Gappion for External Works

Page 5 of 13 M.Sarfraz
Snr. DC
Consultant : DAR Al Handasha Discipline : Over All
Main Contractor : ZHBG Rundate : 28-Feb-23

Cancel
led/ Total
Open Code A Code B Code C Code D
Supers Received
eded Sub-Contractor Approval Register (Electrical)
0 0 2 1 0 0 3
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
Status Code
Latest Date Approval Average Days Number of
Sl No. Discipline Reference No. Rev. Description Subcontractor / Supplier Date Received Remarks
Rev. Submitted Required By Outstanding Days Held
A B C D

1 Elec KAIG-SUB-ZHBG-00-E-005 0 Prequalification for MEP Design Works Consult (EMDC Group) 08.07.19 22.07.19 18.08.19 41 C

Elec KAIG-SUB-ZHBG-00-E-005 1 L Prequalification for MEP Design Works Consult (EMDC Group) 22.08.19 05.09.19 26.08.19 4 B

Subcontractor PRQ for Design / Construction / Modification / Expansion


2 Elec KAIG3-SUB-GN-E-0006 0 L of Medium Voltage Substations / Distribution Systems, Design / Mohammed Al-Ojaimi Contracting 16.04.20 30.04.20 29.04.20 13 B Through PSW Only
Construction of Electrical Automation and Control

13.01.00 44985

13.01.00 44985

13.01.00 44985

13.01.00 44985

13.01.00 44985

13.01.00 44985

13.01.00 44985

13.01.00 44985

13.01.00 44985

13.01.00 44985

13.01.00 44985

13.01.00 44985

13.01.00 44985

13.01.00 44985

13.01.00 44985

06.01.00 44985

06.01.00 44985

06.01.00 44985 ###

Page 6 of 13 M.Sarfraz
Snr. DC
Consultant : DAR Al Handasha Discipline : Over All
Main Contractor : ZHBG Rundate : 28-Feb-23

Cancel
led/ Total
Open Code A Code B Code C Code D
Supers Received
eded Sub-Contractor Approval Register (Electrical)
0 0 0 1 0 0 1
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
Status Code
Latest Date Approval Average Days Number of
Sl No. Discipline Reference No. Rev. Description Subcontractor / Supplier Date Received Remarks
Rev. Submitted Required By Outstanding Days Held
A B C D

KAIG3-SUB-GN-LC-0002 0 PRQ for Sup-contractor Approvral for Interactiv Website Ehihad Wesal Co. (Bytes Futre) 15.02.20 29.02.20 19.02.20 4 C

06.01.00 44985 ###

Page 7 of 13 M.Sarfraz
Snr. DC
Consultant : DAR Al Handasha
Main Contractor : ZHBG 28-Feb-23

Open Code A Code B Code C Code D


Sub-Contractor Approval Register (Mech)
0 0 0 4 0
KING ABDULLAH INTERNATIONAL GARDENS PROJECT

Latest Date Approval


Sl No. Discipline Reference No. Rev. Description Subcontractor / Supplier Date Received Remarks
Rev. Submitted Required By

Sub-Contractor Approval for Supply, Installation, Engineering, Testing &


KAIG3-SUB-GN-M-0019 1 L Unigaz - Abunayyan Trading 05.09.22 19.09.22 10.09.22
Comissioning for the Fuel System

KAIG3-SUB-GN-M-0025 0 L Sub-Contractor Approval for Testing Carbon Steel Welded Joints Universal Inspection Co. Ltd 11.09.22 25.09.22 21.09.22

Sub-Contractor Approval for Supply, Instalaltion, Engineering, Testing &


KAIG3-SUB-GN-M-0026 0 L Aldress Indstrial Trading Co. (ALITCO) 12.09.22 26.09.22 17.09.22
Commissioning for the Fuel System

Sub-Contractor Approval for Installation, Testing & Commissioning for


KAIG3-SUB-GN-M-0027 0 L Setraa Advanced Technology Co. 15.09.22 29.09.22 24.09.22
MEP Works in the Crescent

Page 8 of 13 M.Sarfraz
Snr. DC
SUBCONTRACTOR CODE C SUMMARY DETAILS FROM AUGU

LATEST
SN# TRANSMITTAL# REV.
REV.

1 KAIG3-SUB-GN-A-0036 0 L

2 KAIG3-SUB-GN-M-0019 1 L

3 KAIG3-SUB-GN-M-0025 0 L

4 KAIG3-SUB-GN-M-0026 0 L

5 KAIG3-SUB-GN-M-0027 0 L
SUBCONTRACTOR CODE C SUMMARY DETAILS FROM AUGUST 10,2022 UP TO NOVEMBER 16,2022

MATERIAL DESCRIPTION SUPPLIER

BEAUTY DESIGN COMPANY


Sub-Contractor Approval for Wooden door works
FOR WOOD ( BDCO )

Sub-Contractor Approval for Supply, Installation, Engineering, Testing &


Unigaz - Abunayyan Trading
Comissioning for the Fuel System

Sub-Contractor Approval for Testing Carbon Steel Welded Joints Universal Inspection Co. Ltd

Sub-Contractor Approval for Supply, Instalaltion, Engineering, Testing & Aldress Indstrial Trading Co.
Commissioning for the Fuel System (ALITCO)

Sub-Contractor Approval for Installation, Testing & Commissioning for MEP Setraa Advanced Technology
Works in the Crescent Co.

DISCIPLINE TOTAL

ARCHITECTURAL 1

MECHANICAL 4

TOTAL 5
BER 16,2022

REQUIRED
SUBMITTED RECEIVED
DISCIPLINE APPROVAL
DATE DATE
DATE

A 26-Oct-22 9-Nov-22 31-Oct-22

M 5-Sep-22 19-Sep-22 10-Sep-22

M 11-Sep-22 25-Sep-22 21-Sep-22

M 12-Sep-22 26-Sep-22 17-Sep-22

M 15-Sep-22 29-Sep-22 24-Sep-22


Consultant : DAR Al Handasha Discipline : Over All
Main Contractor : ZHBG Rundate : 28-Feb-23

Cancel
led/ Total
Open Code A Code B Code C Code D
Supers Received
eded Sub-Contractor Approval Register (Mech)
0 0 1 0 0 0 1
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
Status Code
Latest Date Approval Average Days Number of
Sl No. Discipline Reference No. Rev. Description Subcontractor / Supplier Date Received Remarks
Rev. Submitted Required By Outstanding Days Held
A B C D

Sub-Contractor Approval for Chilled Water Pipng Installation, Testing


1 Mech KAIG3-SUB-GN-P-0001 0 L Al-Noor Al Rakhi Contracting 30.11.21 14.12.21 26.12.21 26 B
And Commissioning

2 13.01.00 44985

3 13.01.00 44985

4 13.01.00 44985

5 13.01.00 44985

6 13.01.00 44985

7 13.01.00 44985

8 13.01.00 44985

9 13.01.00 44985

13.01.00 44985

10 13.01.00 44985

11 13.01.00 44985

12 13.01.00 44985

13 13.01.00 44985

13.01.00 44985

13.01.00 44985

13.01.00 44985

44985

44985

44985

44985

44985

06.01.00 44985

06.01.00 44985

06.01.00 44985 ###

Page 12 of 13 M.Sarfraz
Snr. DC
Consultant : DAR Al Handasha Discipline : Over All
Main Contractor : ZHBG Rundate : 28-Feb-23

Cancel
led/ Total
Open Code A Code B Code C Code D
Supers Received
eded Sub-Contractor Aproval Register (Landscape)
0 0 0 1 0 0 1
KING ABDULLAH INTERNATIONAL GARDENS PROJECT
Status Code
Latest Date Approval Average Days Number of
Sl No. Discipline Reference No. Rev. Description Subcontractor / Supplier Date Received Remarks
Rev. Submitted Required By Outstanding Days Held
A B C D

1 LD KAIG-SUB-GN-LS-0001 0 Prequalification for Sub-Contractor of Stone Works and Landscaping Al Atlal Contracting & Landscping 04.11.19 18.11.19 19.11.19 15 C

06.01.00 44985 ###

Page 13 of 13 M.Sarfraz