You are on page 1of 4

ZAID AL-HUSSAIN

Site Engr.
1. Check the Work Site Status
2. Prepare for the Work to be Request to QC Engineer
3. Submit All the required document needed for the RFI to QC Engineer

QC Enginner
1. Make for the RFI
2. Submit to QC Manager for Reviewing and Signature
3. Submit to QC Document Controller

QC Document Controller
1. Scan the Requested RFI
2. Submit the RFI to DAR QC Manager
3. Return the RFI Rejected by DAR QC Manager to Respective QC Engineer
4. Make RFI summary status and update the commented RFI to the server and return to DAR Document Controller
DAR AL-HANDASSAH

DAR QC Manager
1. Review the RFI and Signature
2. All Rejected Review RFI should return to the Contractor
3. All Approved RFI give to DAR Document Controller
4. Sign the commented RFI and give to DAR Project Manager for signature
5. return the RFI to DAR Document Controller

DAR Document Controller


1. Distribute the RFI to DAR Team Leader per Discipline
2. Stamp the commented RFI and give to the contractor for update and make RFI Summary Status

DAR Team Leader/Engineers


1. Distribute the RFI to his respective Engineer for Site Inspection
2. After Inspection on site DAR Engineers will make comment and signature to the RFI
to DAR Document Controller 3. DAR Team Leader will sign the RFI after DAR Engineers Inspection and comment
ake RFI Summary Status

e to the RFI
KING ABDULLAH INTERNATIONAL GARDEN PHASE 3 PROJECT QC DEPARTMENT RFI FLOW CHART CYCLE

Zaid Al-Hussain Site Engineer Zaid Al-Hussain QC Engineer Zaid Al-Hussain Document Controller
1. Site Engineer ask the QC Engineer to submit RFI 1. QC Engineer to be sure work is ready 1. Scan the RFI and submit to DAR QC Manager to
for the ready work at site 2. Make the RFI and submit to QC Manager for reviewing check
and signature.
3. After the signature of QC Manager submit the RFI to QC
DC

DAR QC Manager
1. Review the RFI and submit to DAR DC

Zaid Al-Hussain Document Controller


DAR QC Document Controller 1. Scan the RFI and Update QC Log
1. Recount and stamp the commented RFI and return it 2. Make RFI Summary Status and return it back to
back to the contractor QC Document Controller for DAR to send to owner and update in PCW to closed DAR Document Controller
scanning and making the RFI summary status 1. Received Stamp and Distribute the RFI to DAR Team
Leader as per Discipline

DAR Team Leader/ Engineers


DAR Project Manager 1. Distribute the RFI to his respective Engineer for Site
1. Make signature for the all RFI in particular date DAR QC Manager Inspection (next day)
and after signature give it to DAR Document 1. Final signature for the RFI and give to the DAR Project 2. After Inspection on site DAR Engineers will make his
Controller Manager for signature comment and sign the RFI and return it to their Team
Leader for signature
3. DAR Team Leader will return the RFI to DAR QC
Manager for final signature