Site Engr.
1. Check the Work Site Status
2. Prepare for the Work to be Request to QC Engineer
3. Submit All the required document needed for the RFI to QC Engineer
QC Enginner
1. Make for the RFI
2. Submit to QC Manager for Reviewing and Signature
3. Submit to QC Document Controller
QC Document Controller
1. Scan the Requested RFI
2. Submit the RFI to DAR QC Manager
3. Return the RFI Rejected by DAR QC Manager to Respective QC Engineer
4. Make RFI summary status and update the commented RFI to the server and return to DAR Document Controller
DAR AL-HANDASSAH
DAR QC Manager
1. Review the RFI and Signature
2. All Rejected Review RFI should return to the Contractor
3. All Approved RFI give to DAR Document Controller
4. Sign the commented RFI and give to DAR Project Manager for signature
5. return the RFI to DAR Document Controller
e to the RFI
KING ABDULLAH INTERNATIONAL GARDEN PHASE 3 PROJECT QC DEPARTMENT RFI FLOW CHART CYCLE
Zaid Al-Hussain Site Engineer Zaid Al-Hussain QC Engineer Zaid Al-Hussain Document Controller
1. Site Engineer ask the QC Engineer to submit RFI 1. QC Engineer to be sure work is ready 1. Scan the RFI and submit to DAR QC Manager to
for the ready work at site 2. Make the RFI and submit to QC Manager for reviewing check
and signature.
3. After the signature of QC Manager submit the RFI to QC
DC
DAR QC Manager
1. Review the RFI and submit to DAR DC