Project Name : Dubai Creek Harbour Development – Dubai Creek Residences

Client Project Manager Engineer Main Contractor

METHOD STATEMENT FOR ERECTION OF TOWER CRANE


Dubai Creek Harbour Development - Dubai Creek Residences

Dubai Creek Residences: Main Contract Works

Table of contents

1. Scope/Objectives

2. Reference

3. Access/Egress and Location

4. Health & Safety

5. Definitions

6. Responsibilities/Supervision

7. Sequence/Method to be employed

8. Man-power requirement

9.Equipment/Materials requirement

10.Q.C. Approvals & Other documentation

11.Supporting documentation

12.Distribution

13.Other Information

14.Attachments

1
Project Name : Dubai Creek Harbour Development – Dubai Creek Residences

Client Project Manager Engineer Main Contractor

METHOD STATEMENT FOR ERECTION OF TOWER CRANE


1. Scope/Objectives
This method statement is to define the procedures & methodology to be adopted during the
erection of the Tower crane.
2. Reference
2.1 Contract Drawings
2.2 specifications
2.3 Project Quality Plan TS-ABM-CIV-PQP-0012 R.1
2.4 HSE Plan TS-ABM-CIV-HSE-0014 -R.1
3. Egress and Location
Access to the work place will be through designated and exit pathway.
4. Health & Safety
4.1.Contractor will comply with all safety measures as applicable to project safety
requirement.
4.2.PPE will be worn at all times as required.
4.3.Proper and safe access and enough barricades to the work areas shall be installed &
maintained throughout the working period.
4.4.Proper communication should be ensured.
5. Definitions
ATK-ATK Engineering & Consultant
ABM-Al Basti & Muktha LLC
MS-Method Statements
QCP-Quality Control Procedures
6. Responsibilities/Supervision
6.1 Project Engineer:
 Shall be responsible to organize required machinery, material, man power to engineers
/ supervisor & foreman for effectively executing the work in a safe manner.
 To clarify any discrepancies in the work .
6.2. Site Engineer / Foreman:
 To execute the work as per Project Engineers instructions with the right methodology &
in a safe manner.
 Make sure that all the works are completed prior to offering for inspections.

2
Project Name : Dubai Creek Harbour Development – Dubai Creek Residences

Client Project Manager Engineer Main Contractor

METHOD STATEMENT FOR ERECTION OF TOWER CRANE


 To execute the works as per approved method statements.
 To attend all the comments made by Consultant at the time of inspection.
 Ensure the workers PPE, sufficient lighting.
6.3. P&M Engineer

Fill the responsibility


Safety

6.4. QA / QC Engineer:
 To check the work is carried out as per the approved method statement.
7 Sequence/Method to be Employed
 The sequence/method/procedure for the erection of the tower crane will be followed as
per the attached Method statement for Erection by M/S. Modern Emirates.
8. Man Power Requirement
 Site Engineer
 P&M Engineer
 Foreman
 Charge hand
 Mason
 Skilled and unskilled labour
9 Equipment/Materials required
 Mobile crane or Tower crane
10. QC APPROVAL AND OTHER DOCUMENTRY REQUIREMENTS
Follow approved Method Statement, ITP, QCP, HSE Plan, and Material Approval.
11. SUPPORTING DOCUMENTATION
This MS to be read in conjunction with the below referenced documents
 Contract Drawings and specifications
 Project Quality Plan
 Project HSE Plan
3
Project Name : Dubai Creek Harbour Development – Dubai Creek Residences

Client Project Manager Engineer Main Contractor

METHOD STATEMENT FOR ERECTION OF TOWER CRANE


12. DISTRIBUTION
Copies of this MS will be circulated to the following for Information & action
 Project Manager
 Construction Manager
 Site Engineer
 QA/QC Engineer
 HSE Engineer
13. OTHER INFORMATION
Ensure that all the activities have been carried out to suit the site conditions and involved with
Site in Charge.
14. ATTACHMENTS
 Risk Assessment
 Method statement for Erection by M/S. Modern Emirates