SECTION 1
SCAFFOLDING
1
Project Name : Dubai Creek Harbour Development – Dubai Creek Residences
1. Scope/Objectives
2. Reference
5. Definitions
6. Responsibilities/Supervision
7. Sequence/Method to be employed
8. Man-power requirement
9.Equipment requirement
10.Materials requirement
11.Attachments
2
Project Name : Dubai Creek Harbour Development – Dubai Creek Residences
3
Project Name : Dubai Creek Harbour Development – Dubai Creek Residences
Shifting of Scaffolding materials will be carried out by Forklift or Lift Truck from Store
or Material Yard .From there it will shift to work location by manually
7.2 Erection
Cup lock System of Scaffolding materials will be used for complete erection.
We will use Cup Lock standard of 3.0M length. They Have ‘V” Pressing welded at 495 MM
centres to Provide 4 way Connection for Propping Ties Ledgers will be inserted
Horizontally into ‘V” Pressing on the Standards .
Adjustable base jack will be used as a foundation on compacted Floor .The plate size of
base Jack will be 15x15 CM with a length of 68cm and Dia 4.8cm Approximate weight
5.7Kgs .
Additional Standards will be mounted on the top of one another by using spigot pins of
length 20CM and tightened by using Bolt and Nuts.
Fully boarded platform to be used. The boards will be placed and locked by using boarded-
retaining clamps. In additional .toe board will be provided .Boards to be shifted to higher
levels according to the progress of work. Access to the scaffolding structure will be through
from floor.
Additional support will be considered to provide access to the scaffolding structure from
floor level.
4
Project Name : Dubai Creek Harbour Development – Dubai Creek Residences
7.3 Testing
After completion of scaffolding erection it will be checked properly and tag will be placed.
Periodic checking will be carried out and scaffolding tag signed to maintain the safety
standards.
7.4. Dismantling:
The dismantling works will be carried out in the same manner as per erection of the
scaffolding structure. But it will start from top.
5
Project Name : Dubai Creek Harbour Development – Dubai Creek Residences
11. ATTACHMENTS
Risk Assessment
6
Project Name : Dubai Creek Harbour Development – Dubai Creek Residences
SECTION-2
TOWER CRANE
7
Project Name : Dubai Creek Harbour Development – Dubai Creek Residences
1. Scope /Objectives
2. Reference
4. Logistics
5. Responsibilities / Supervision
7. Training
8. Working hours
9. House keeping
8
Project Name : Dubai Creek Harbour Development – Dubai Creek Residences
This Method Statement outlines the Erecting methodology of Tower Crane Liebherr290 HC
Using area of the ERECTING tower crane will take place. Area should be clean.
Using area of the ERECTING tower crane will take place. Area Should be clean
9
Project Name : Dubai Creek Harbour Development – Dubai Creek Residences
Before start the work, access for erecting the crane must have occupied in proper way
4. LOGISTICS
The logistics will be involved are
Note: One mobile vehicle should be present in the area of work in case any accident happen.
The Supervisor must be well trained and have the necessary documentation.
The personnel involve in erection must be competent and have the necessary
documentation showing that they had formal training in the safe Installation of tower cranes.
All team of the Installation /Erection must have been given theoretical training by AL
A tool box talk to be given by the supervisor to all team members covering the method
Before start of the work ,Supervisor will check the area is to be completed and free
from any obstruction that may have occurred during erection work .
10
Project Name : Dubai Creek Harbour Development – Dubai Creek Residences
operation be it wind ,balance , power, stoppages then he should stop the work.
The supervisor main duty is to make sure the work is carried out in accordance with
All staff of AL BASTI &MUKTHA LLC. to be involved with activities for that particular
project will be inducted by the ABM. safety officer to be familiars with site safety plan and
drawing and standard taking into consideration before start the installation work
After approval of foundation then fix four legs with site suitable crane
After completion of all mentioned process then we take care about erection of main mast
section. It will placed by external tower crane. It requires to hold by four legs chain sling with
help of external tower crane. After joining of 16 nos. nuts to l and bolts to the crane legs then
main mast section will erect on foundation.
While erection of main mast then climbing cage assembly taking place , it requires four leg
chain sling. With the help of external mobile crane it requires to hold by the crane by chain
sling then slowly put down on to main mast section
11
Project Name : Dubai Creek Harbour Development – Dubai Creek Residences
In this process we have require 160 ton external crane .Then designated sections will placed
one after one by fastened 8 nos. joint nuts and bolts by proper hammering of 8 pound
hammer. Each bolt contains two section at a place. After fastening designated bolt then we
erected mast section one after another on main mast section.
In this step we will use four legs chain sling at lifting position. All power supplying cable to be
attached with cabin then we have to fastened 8 nos. nuts and bolts which to be fastened with
mast section. The method taking place with proper hammering by 8 pound hammer. After that
cabin has taking place on mast by external mobile crane.
Mentioned section must have proper lifting by tow leg chain sling with help of external 160 ton
crane then we fastened four nos. joint pin ( to be joined with cabin) by proper hammering with
8 pound hammer. After that whole section must be taking place on cabin by 160 ton mobile
crane
In this process we must positioning the jib near by the external crane. . Af first we will do
suitable position of the counter jib and will be placed 12 mm nylon rope at both end. It can be
done due to maintain of proper positioning. It requires two workmen. Each at the both end.
They will hold the rope
. Then we allow the crane to hold the counter jib with four leg chain sling. Now we lift the jib
upto our installing position after that we will fix the counter jib with cabin by pin.Then we going
to fix both side tie bar .After that we uplift the jib upto 1.5 to 2 mtrs from its original position.
Whole work has to be supported by designated erectors . Then we bring down the jib in its
original position from upper level. Erection of this work is done.
Now we will installing the block with help of external 160 ton crane through proper safety
measurement takes place. In this process it requires to hold the block by chain sling with 160
ton crane and installing in counter jib
12
Project Name : Dubai Creek Harbour Development – Dubai Creek Residences
Its one of the essential step in the erection work. We must be taken all safety aspect taken into
consideration. At first we will do suitable position of the jib and will be placed 12 mm nylon
rope at both end. It can be done due to maintain of proper positioning. It requires two
workmen. Each at the both end. They will hold
the rope until job done and attach with cabin. Now we employ 250 ton external crane. Which
require to hold the jib by chain sling 20 ton capacity at maintain a gap 22 mtrs from fixing end
with cabin (as per manufacturer drawing).Then we fix the boom with cabin through fasten with
2 nos.pin.Then we will lift the boom jib up to 1.5 -2 mtrs. Now we will fix the tie bar of boom jib
with help of the hoist motor. As the tie bar taking rest on top of jib then we bring down the jib in
its original position from upper level. Boom Jib erection job is done
In this step we will going through the process is, one by one installation of counter ballast
block in the counter jib with the help of 250 ton external crane. Proper lifting and procedure
must be taken into consider in this process.
13
Project Name : Dubai Creek Harbour Development – Dubai Creek Residences
At first we have ensure that proper manpower will have employ to installing the hook block.
After checking all electrical function and electrical equipment in the crane proper manner then
we de-segment the hoist rope then we lock the hoist rope through proper clamping tool and fix
the rope with hook block. Two nos. erectors employ in the trolley with proper PPE (double line
safety belt) at the end of 60 mtrs. boom jib. After that we will fix the rope with end eye pin.
Then both erectors will travel back portion of the jib with help of mentioned trolley for find a
safe place.
14
Project Name : Dubai Creek Harbour Development – Dubai Creek Residences
The supervisor involve in erection must himself comply then ensure that the installation crews
comply with these standard procedures during the all Installation work.
Safety helmets , safety harness , safety boots and high visibly vests must be worn at all
Competence of personnel :- All personnel employed for the operation must be suitably
trained and competent to perform their allotted tasks.( certificates ’will be provided )
To secure that protected from falling down from the crane structure or handrails ,the
safety harness must be correctly clipped to a secure part of the crane structure preferably
8. WORKING HOURS
Working hours will be 7:00 AM To 5.00PM from Saturday to Thursday / week
9. HOUSE KEEPING
Before start of the work ,Supervisor will check the area is to be completed and free from any
obstruction that may have occurred during erection work .
15
Project Name : Dubai Creek Harbour Development – Dubai Creek Residences
16
Project Name : Dubai Creek Harbour Development – Dubai Creek Residences
SECTION-3
MATERIAL/PASSENGER
HOIST
17
Project Name : Dubai Creek Harbour Development – Dubai Creek Residences
1. Scope/Objectives
2. Reference
5. Definitions
6. Responsibilities/Supervision
7. Sequence/Method to be employed
8. Man-power requirement
9.Equipment requirement
10.Materials requirement
11.Attachments
18
Project Name : Dubai Creek Harbour Development – Dubai Creek Residences
19
Project Name : Dubai Creek Harbour Development – Dubai Creek Residences
20
Project Name : Dubai Creek Harbour Development – Dubai Creek Residences
11. ATTACHMENTS
Risk Assessment
22
Project Name : Dubai Creek Harbour Development – Dubai Creek Residences
SECTION-4
PLACING BOOM
23
Project Name : Dubai Creek Harbour Development – Dubai Creek Residences
1. Scope/Objectives
2. Reference
5. Definitions
6. Responsibilities/Supervision
7. Sequence/Method to be employed
8. Man-power requirement
10.Attachments
24
Project Name : Dubai Creek Harbour Development – Dubai Creek Residences
25
Project Name : Dubai Creek Harbour Development – Dubai Creek Residences
Some of the assembly work will be completed at the RMG workshops prior to installation. This
is intended to limit the amount of working at height required on site
The installed structure is inspected by the manufacturer prior to use. A safety certificate is
issued once the manufacturer is satisfied that the machine is installed according to
manufacturer’s guidelines.
The standard installation time is 5 working days. The minimum number of team members is six
men during installation (team leader plus 5 crew members).
Installation Process
1. The Site Supervisor is to inspect the cut outs to ensure correct alignment and the verticality
of the up-prop frame and the column is not more than 0.5/1000.
2. Attach the crane to the hydraulic jack up cylinders and cross members, install each
separately.
26
Project Name : Dubai Creek Harbour Development – Dubai Creek Residences
4. Attach 4 hooks of the crane to the column at the top of the first section, tighten the chains of
the crane, lift the section into the cut-out to put the cross member in place which takes the load
of the column first section. The first section weights 3 tons approximately.
5. Attach 4 hooks of the crane to the column at the top of the second section, fasten joining
bolts, between column 1 & 2. The second column weighs 3 tons approximately.
6. Attach 4 hooks of the crane to the column at the top of the third section, fasten column
joining bolts, between column 2 & 3. Remove the third column section with the platform
assembly. The third column section with platform weighs 3 tons approximately.
7. Attach crane hook to hydraulic tank assembly, place on the third section platform and fix.
8. Attach crane hook to motor assembly, install into place and fix to the third section platform.
9. Attach 3 hooks of the crane to the boom turntable assembly and lift into position on top of
the column third section. Fix the wedge locks for pins that fasten the turntable assembly to the
columns sections. The turntable assembly weighs approximately 4.5 tons.
10. Attach the crane hook to the lifting hook on the boom assembly in the centre as shown,
tighten the chains and fix into position on the turntable using the locking pins. The boom
section weighs approximately 5.5 tons.
13. Lift and install all counter weights, each counter weight weighs approximately 2.5 tons.
14. Fix the electrical cables from the distribution box to the customer’s main electrical supply
using the customer’s cable.
27
Project Name : Dubai Creek Harbour Development – Dubai Creek Residences
On Completion of Installation
1. The boom operator is responsible for carrying out manufacturers starting operations to
verify the safe and correct installation of the boom.
2. The team leader is responsible to ensure all tools have been removed and equipment
stowed in the storage locker.
3. The team leader will notify the site authority that the work is complete and close off the
permit to work.
4. The site supervisor will confirm task close out with the plant and conduct a revised Site
Assessment for future supply of concrete.
28
Project Name : Dubai Creek Harbour Development – Dubai Creek Residences
29
Project Name : Dubai Creek Harbour Development – Dubai Creek Residences
30
Project Name : Dubai Creek Harbour Development – Dubai Creek Residences
SECTION-5
LOADING PLATFORMS
31
Project Name : Dubai Creek Harbour Development – Dubai Creek Residences
1. Scope/Objectives
2. Reference
5. Definitions
6. Responsibilities/Supervision
7. Sequence/Method to be employed
8. Man-power requirement
10.Attachments
32
Project Name : Dubai Creek Harbour Development – Dubai Creek Residences
33
Project Name : Dubai Creek Harbour Development – Dubai Creek Residences
34
Project Name : Dubai Creek Harbour Development – Dubai Creek Residences
Dismantle the platform in reverse sequence to the above assembly procedure. Clean
and place the dismantled components in the supplied stillages.
35
Project Name : Dubai Creek Harbour Development – Dubai Creek Residences
36
Project Name : Dubai Creek Harbour Development – Dubai Creek Residences
SECTION-6
BACK PROPPING(DECKING)
37
Project Name : Dubai Creek Harbour Development – Dubai Creek Residences
1. Scope/Objectives
4. Definitions
5. Responsibilities/Supervision
6. Sequence/Method to be employed
7. Man-power requirement
8.Equipment requirement
9.Attachments
38
Project Name : Dubai Creek Harbour Development – Dubai Creek Residences
39
Project Name : Dubai Creek Harbour Development – Dubai Creek Residences
40
Project Name : Dubai Creek Harbour Development – Dubai Creek Residences
41
Project Name : Dubai Creek Harbour Development – Dubai Creek Residences
42
Project Name : Dubai Creek Harbour Development – Dubai Creek Residences
43
Project Name : Dubai Creek Harbour Development – Dubai Creek Residences
44
Project Name : Dubai Creek Harbour Development – Dubai Creek Residences
45
Project Name : Dubai Creek Harbour Development – Dubai Creek Residences
Step 8 : Pouring
To protect the surface of the form-facing,use the vibrator with a protective rubber
cap
Step 9:Stripping Out.
Remove the intermediate props and put them in the stacking pallet
46
Project Name : Dubai Creek Harbour Development – Dubai Creek Residences
47
Project Name : Dubai Creek Harbour Development – Dubai Creek Residences
48
Project Name : Dubai Creek Harbour Development – Dubai Creek Residences
49
Project Name : Dubai Creek Harbour Development – Dubai Creek Residences
SECTION-7
DEWATERING SYSTEM
50
Project Name : Dubai Creek Harbour Development – Dubai Creek Residences
1. Scope/Objectives
2. Reference
5. Definitions
6. Responsibilities/Supervision
7. Sequence/Method to be employed
51
Project Name : Dubai Creek Harbour Development – Dubai Creek Residences
52
Project Name : Dubai Creek Harbour Development – Dubai Creek Residences
53
Project Name : Dubai Creek Harbour Development – Dubai Creek Residences
Well points shall be installed into the boreholes at 1m intervals. High pressure water
shall be injected into the ground through the 7m lance; forming a borehole into which
the well point shall be inserted. Once the well point is installed the lance is held in this
position until the water being ejected out through the top of the borehole runs clean.
The borehole and well point surrounds are backfilled with aggregate, 10 to 15cm above
the working platform. As the jetting lance is withdrawn from within the borehole, the
aggregate shall reduce to 0.0 levels by the displacement created by the removal of the
lance. This procedure is repeated upon installation of each well-point.
54
Project Name : Dubai Creek Harbour Development – Dubai Creek Residences
55
Project Name : Dubai Creek Harbour Development – Dubai Creek Residences
56
Project Name : Dubai Creek Harbour Development – Dubai Creek Residences
Once complete, the dewatering system shall be started with the approval of the
Client's representative. After the first 12 hours of running, all well-point locations shall
be observed and adjusted, so that the correct vacuum is created to achieve full
efficiency of the system. Excavation shall be started 24 Hrs. after the commissioning
of dewatering system, it has to be kept operational as per site requirements and shall
be monitored round the clock.
The number of well points that will be installed shall be designed specifically to avoid
any significant settlements in the ground. Additionally, water levels and dewatering
system shall be monitored round the clock to ensure that no settlements take place.
57
Project Name : Dubai Creek Harbour Development – Dubai Creek Residences
SECTION-8
LIFTING PLAN
58
Project Name : Dubai Creek Harbour Development – Dubai Creek Residences
1. Scope/Objectives
2. Reference
5. Definitions
6. Responsibilities/Supervision
7. Sequence/Method to be employed
8.Attachments
59
Project Name : Dubai Creek Harbour Development – Dubai Creek Residences
60
Project Name : Dubai Creek Harbour Development – Dubai Creek Residences
When performing the crane operation using mobile crane, before starting the work and
for safe completion of the work, it is important to study various items regarding safety,
such as the size of work place, the surroundings, the topographical or geological
condition, and to determine the type and performance of a mobile crane according to
the mass of the loads, the operating radius, the actual lifting range, etc. and to further
study the assignment of necessary workers, technically important points and
precautions for safe operation. According to the above study and determination, the
fundamental operation procedure should be prepared and the lifting operation should
be performed under the below procedure.
61
Project Name : Dubai Creek Harbour Development – Dubai Creek Residences
a. Before starting the work, the meeting among a foreman, an operator, slingers, a
signaler and others should be held regarding the work method and the work
procedure.
b. The conformation between an operator and a signaler should be made regarding
the signaling method (walkie talkie radio).
Set up the mobile crane horizontally on the firm and level surface. Extend right and left
outriggers uniformly to their maximum length. If the ground is soft and weak, reinforce it or
take other appropriate measures. When overhead electric power line is located nearly,
take measures to prevent electric shock, such as keep minimum recommended distance
away for electric lines etc.
a. Confirm that the ground bearing is strong enough. On the soft and weak ground,
reinforce the ground or take other appropriate action
b. Place wide and strong planks under the outriggers (to disperse a load concentrated
on the outrigger float).
c. Look at a level gage and adjust outrigger jacks to make the crane body level. Get
tires afloat above the ground.
d. Conform the outriggers extended before taking off the hook block from a clamping
ring
62
Project Name : Dubai Creek Harbour Development – Dubai Creek Residences
a. Do not perform rough operations that cause excessive centrifugal force or inertia
force. Don’t lower a lifted load by using the free fall method.
b. Perform at a slow slewing speed while suspending a heavy load. Rapid slewing
creates the centrifugal force that swings the load away outside the pin point, extends
the operating radius and may result in overturning of the mobile crane.
63
Project Name : Dubai Creek Harbour Development – Dubai Creek Residences
64
Project Name : Dubai Creek Harbour Development – Dubai Creek Residences
p. Prohibit the pick and carry operation as a general rule which may cause the over-
turning danger. When carry out it due to unavoidable reason, carry out while paying
careful attention to the followings:
Select a flat ground surface location that is neither soft nor weak
Keep the load at lowest height, prevent the load from swaying and put a
slewing lock into action
Travel as slow as possible
Make sure not to be overloaded
Extend outriggers and keep float above the ground during traveling
a. After finishing work, hoist up the hook block completely. When moving a mobile
crane with box jib to other, working sites, return the jib and outriggers to specified
traveling configuration and lock the slewing device.
b. As for the mobile crane equipped with P.T.O. (power-take-off), turn off the P.T.O.
control lever before traveling.
c. Descend slopes using engine brake force and exhaust brake simultaneously. Keep
crane traveling at safe speed while descending.
d. Do not perform the rough driving, such as excessive speed, abrupt start or stop,
zigzag etc.
65
Project Name : Dubai Creek Harbour Development – Dubai Creek Residences
2. Radio (walkie talkie) may be used between Banksman & Operator for more
better communication.
8. Attachment
Risk Assessment
66
Project Name : Dubai Creek Harbour Development – Dubai Creek Residences
SECTION-9
SUPPORT
67
Project Name : Dubai Creek Harbour Development – Dubai Creek Residences
1. Scope/Objectives
2. Reference
5. Definitions
6. Responsibilities/Supervision
7. Sequence/Method to be employed
8. Man-power requirement
10.Attachments
68
Project Name : Dubai Creek Harbour Development – Dubai Creek Residences
69
Project Name : Dubai Creek Harbour Development – Dubai Creek Residences
Ensure all operatives have been passed the safety induction and have read and
understood this method statement.
Ensure that the work will be supervised all the time by a competent site engineer/ site
supervisor and the safety team.
Dewatering shall be done as per the approved method statement and it shall be
continued till the end of building construction.
Excavation for the north and south tower &podium areas will be done separately.
Tower Area
Excavation work shall be started with approved shop drawing and method statement
and which shall be maintained at the site by the site engineer/Formanat all times of
excavation works.
Excavation boundary and a reference level for the tower areashall be set out bythe
surveyor prior to start excavation and it shall be as per the approved setting out
drawings.
Excavation boundary shall be set with an allowance of 1.5m away from the boundary of
structure as well as towards the podium area side in order to get proper working space.
Precautions shall be taken in order not to disturb the already constructed piles.
70
Project Name : Dubai Creek Harbour Development – Dubai Creek Residences
In order to prevent material sliding into the excavation area, slopes shall be made,
which shall not be made steeper than 35degree horizontal.
Formation level of excavation shall be 85 mm down from the pile cut-off level as stated
in the standard details drawing
Excavation for the core wall location and manhole/sump pit shall be as per the
approved drawing or as per the standard details, for the respective tower drawings.
All levels shall be in accordance with the approved shop drawings unless otherwise
instructed by the Engineer.
Excavation to done as per levels and dimensions indicated in the drawing within a
tolerance of plus or minus 15mm.
Bottom of the excavation shall not be disturbed and final grade of 150mm will be
excavated, trimmed, levelled, and clean by removing all loose particles.
An inspection request shall be raised for the excavation and formation works up to the
satisfaction of Engineer.
Plate load test shall be taken for the formation level and it shall be compacted to 95%
of maximum dry density.
Blinding concrete shall be done for the raft foundation as per the approved concrete
mix design.
Any overcut excavation shall be backfilled to the required formation level with blinding
concrete.
Any unexpected subsurface conditions that may affect the work will be reported to the
Engineer.
71
Project Name : Dubai Creek Harbour Development – Dubai Creek Residences
Excavation boundary and a reference level for the podium area shall be set out by the
surveyor prior to start excavation and it shall be as per the approved setting out
drawings.
Excavation boundary shall be set with an allowance of 1.5m away from the boundary of
structure side in order to get proper working space.
Podium excavation work will start in the podium area location, while construction of raft
foundation is in progress, as per the approved shop drawing.
Precautions shall be taken in order not to disturb the already constructed piles.
72
Project Name : Dubai Creek Harbour Development – Dubai Creek Residences
In order to prevent material sliding into the excavation area, slopes shall be made,
which shall not be made steeper than 35degree horizontal.
Formation level of excavation shall be 85 mm down from the pile cut-off level as stated
in the standard details drawing
Excavation for the trench/pit details shall be done as per the approved drawings or as
per typical section details
All levels shall be in accordance with the approved shop drawings unless otherwise
instructed by the Engineer.
Excavation to done as per levels and dimensions indicated in the drawing within a
tolerance of plus or minus 15mm.
Bottom of the excavation shall not be disturbed and final grade of 150mm will be
excavated, trimmed, levelled, and clean by removing all loose particles.
An inspection request shall be raised for the excavation and formation works up to the
satisfaction of Engineer.
Plate load test shall be taken for the formation level and it shall be compacted to 95%
of maximum dry density.
Blinding concrete shall be done for the raft foundation as per the approved concrete
mix design.
Any overcut excavation shall be backfilled to the required formation level with blinding
concrete.
Any unexpected subsurface conditions that may affect the work will be reported to the
Engineer.
Any soft and non-compactable material found at the excavated area will be removed &
replaced with suitable soil improvement material as instructed by Engineer.
73
Project Name : Dubai Creek Harbour Development – Dubai Creek Residences
Minimum sloping or shoring requirements and maximum spacing of timbers are given
in Tables 1 and 2 and illustrated in Figures 1 to 16. Variations from these standards or
alternate designs must be in accordance with written instructions from a professional
engineer.
Shoring uprights must extend at least 300 mm (1 ft) above the top of trench walls
(except where road plates are being used). Uprights must go as close to the bottom of
the trench as permitted by the material being installed in the trench, but in no case
more than 600 mm (2 ft) from the bottom. Uprights must not be inclined outward more
than 15˚ from vertical when viewed along the trench.
The sides of the excavation must be trimmed or scaled to remove any loose material,
rocks, or other objects that could endanger workers.
A level area extending 600 mm (2 ft) back from the edges of the trench must be
maintained free of materials and equipment.
In trenches of similar excavations over 1.2 m (4 ft) deep, a ladder or other safe means
of entry and exit shall be provided in the immediate area where workers are employed.
The ladder must extend from the bottom of the excavation to at least 1 m (3 ft) above
the ground level.
Walkways for access to a bulk excavation must be at least 500 mm (20 in) wide, and
have handrails and guardrails wherever required.
74
Project Name : Dubai Creek Harbour Development – Dubai Creek Residences
End shoring must be designed by a professional engineer where the trench width
exceeds 1.8 m (6 ft).
Where the base width of an excavation exceeds 3.7 m (12 ft), shoring may require
engineering design or be impracticable. In an unsloped excavation that has not been
certified by a professional engineer, workers should remain clear from the base of the
slope a distance not less than the depth of the excavation. To ensure that workers do
not violate this minimum distance, barricades, warning ribbons, and/or signage should
be installed.
Back Filling
Place Suitable material which shall be tested as per specificationE20-511D, for backfill
around the structure and other filling area wherever backfilling is required.
Compact the location using suitable plate compactor /roller and compact it up to
95percent of MDD
Compaction to be done for the max 200mm layer thickness
Field density test shall be conducted for each layer as per the specification
75
Project Name : Dubai Creek Harbour Development – Dubai Creek Residences
Project Engineer
Site Engineer
QA/QC Engineer
Foreman
Charge hand
Steel fitters & helpers Skilled & Unskilled Labours
Helpers
9. Material/Machinery Requirement
Excavator
Shovel
JCB
Dump Truck
Hand Shovel.
Compactor
10. Attachment
Risk Assessment
76
Project Name : Dubai Creek Harbour Development – Dubai Creek Residences
SECTION-9
FOR REVERSE
WATERPROOFING
77
Project Name : Dubai Creek Harbour Development – Dubai Creek Residences
1. Scope/Objectives
2. Reference
5. Definitions
6. Responsibilities/Supervision
7. Procedure/Method to be employed
8. Man-power requirement
9. Material requirement
10.Equipment requirement
11.Attachments
78
Project Name : Dubai Creek Harbour Development – Dubai Creek Residences
80
Project Name : Dubai Creek Harbour Development – Dubai Creek Residences
81
Project Name : Dubai Creek Harbour Development – Dubai Creek Residences
83
Project Name : Dubai Creek Harbour Development – Dubai Creek Residences
84