Consultant : DAR

Cancelled/ Total
Open Code A Code B Code C Code D
Superseded Received
Main Contractor : ZHBG

0 0 0 0 0 0 0
DESIGN DRAWING SUBMITTAL REGISTER Sub Contractor :
Discipline : Structural
STRUCTURAL-Concrete Rundate: 28-Feb-2023
Drawing Number Late A B C D
Submitted Approval Received Average Days Number of
Sl No. Rev. st Description Submittal Reference Number Rev. Remarks
Date Required By Date Oustanding Days Held
Project Building Contr TypesubmiDiscplilne SUB. Disc Nature Level Area Sl of DwDwg no. Rev.

1 13.01.00

2 13.01.00

3 13.01.00

13.01.00

4 13.01.00

5 13.01.00

6 13.01.00

7 13.01.00

8 13.01.00

9 13.01.00

10 05.01.00 44985

11 05.01.00 44985

12 05.01.00 44985

13 05.01.00 44985

14 05.01.00 44985

15 05.01.00 44985

16 05.01.00 44985

#REF! 44985

44985

44985

44985

44985

44985

44985

44985

44985

###

Page 1 of 111 M.Sarfraz


Consultant : DAR

Cancelled/ Total
Open Code A Code B Code C Code D
Superseded Received
Main Contractor : ZHBG

0 0 0 0 0 0 0
DESIGN DRAWING SUBMITTAL REGISTER Sub Contractor :
Discipline : Structural
STRUCTURAL-STEEL Rundate: 28-Feb-2023
Drawing Number Late A B C D
Submitted Approval Received Average Days Number of
Sl No. Rev. st Description Submittal Reference Number Rev. Remarks
Date Required By Date Oustanding Days Held
Project Building Contr TypesubmiDiscplilne SUB. Disc Nature Level Area Sl of DwDwg no. Rev.

1 13.01.00 44985

13.01.00 44985

13.01.00 44985

2 13.01.00 44985

13.01.00 44985

3 13.01.00 44985

4 13.01.00 44985

5 13.01.00

6 13.01.00 44985

7 13.01.00 44985

8 13.01.00 44985

9 13.01.00 44985

10 13.01.00 44985

11 13.01.00 44985

12 13.01.00 44985

13 13.01.00 44985

14 13.01.00 44985

15 13.01.00 44985

16 13.01.00 44985

17 13.01.00 44985

18 13.01.00 44985

19 13.01.00 44985

20 13.01.00 44985

#REF! 44985

44985

44985

44985

44985

44985

44985

44985

44985

###

Page 2 of 111 M.Sarfraz


Consultant : DAR

Cancelled/ Total
Open Code A Code B Code C Code D
Superseded Received Main Contractor : ZHBG

0 0 77 74 0 1 154 DESIGN DRAWING SUBMITTAL REGISTER Sub Contractor :


Discipline :-ARCHITECT URAL
ARCHITECTURAL Rundate: 28-Feb-2023
Drawing Number Number of A B C D E
Latest Approval Average Days Number of
Sl No. Rev. Description Submitted Date Reeived Date Days with Submittal Reference Number Rev. Remarks
Rev. Required By Outstanding Days Held
ZHBG

1 KAIG3 DD AG A FM 1000 0 Aviary Front of House & Back of House Furniture Ground Floor Plan Layout 22.07.20 05.08.20 13.08.20 22 929 C KAIG3-DD-AG-A-0001 0

2 KAIG3 DD AG A FM 1000 1 Aviary Front of House & Back of House Ground Floor Furntiure Layout 15.02.21 01.03.21 18.02.21 3 740 C KAIG3-DD-AG-A-0001 1

3 KAIG3 DD AG A FM 1000 2 Aviary Front of House & Back of House Ground Floor Furntiure Layout 21.02.21 07.03.21 06.03.21 13 724 C KAIG3-DD-AG-A-0001 2

4 KAIG3 DD AG A FM 1000 3 Aviary Front of House & Back of House Ground Floor Furntiure Layout 01.04.21 15.04.21 07.04.21 6 692 B KAIG3-DD-AG-A-0001 3

5 KAIG3 DD AG A FM 1000 4 L Aviary Front of House & Back of House Ground Floor Furntiure Layout 04.05.21 18.05.21 10.05.21 6 659 C KAIG3-DD-AG-A-0001 4

6 KAIG3 DD AG A FM 1002 0 Aviary Ground Floor Furniture Layout Front of House 15.02.21 01.03.21 18.02.21 3 740 C KAIG3-DD-AG-A-0001 1

7 KAIG3 DD AG A FM 1002 1 Aviary Ground Floor Furniture Layout Front of House 21.02.21 07.03.21 06.03.21 13 724 C KAIG3-DD-AG-A-0001 2

8 KAIG3 DD AG A FM 1002 2 L Aviary Ground Floor Furniture Layout Front of House 01.04.21 15.04.21 07.04.21 6 692 B KAIG3-DD-AG-A-0001 3

9 KAIG3 DD AG A FM 1003 0 Aviary Ground floor Furniture Layout Back of House (Part-A) 15.02.21 01.03.21 18.02.21 3 740 C KAIG3-DD-AG-A-0001 1

10 KAIG3 DD AG A FM 1003 1 Aviary Ground floor Furniture Layout Back of House (Part-A) 21.02.21 07.03.21 06.03.21 13 724 C KAIG3-DD-AG-A-0001 2

11 KAIG3 DD AG A FM 1003 2 L Aviary Ground floor Furniture Layout Back of House (Part-A) 01.04.21 15.04.21 07.04.21 6 692 B KAIG3-DD-AG-A-0001 3

12 KAIG3 DD AG A FM 1004 0 Aviary Ground floor Furniture Layout Back of House (Part-B) 15.02.21 01.03.21 18.02.21 3 740 C KAIG3-DD-AG-A-0001 1

13 KAIG3 DD AG A FM 1004 1 Aviary Ground floor Furniture Layout Back of House (Part-B) 21.02.21 07.03.21 06.03.21 13 724 C KAIG3-DD-AG-A-0001 2

14 KAIG3 DD AG A FM 1004 2 Aviary Ground floor Furniture Layout Back of House (Part-B) 01.04.21 15.04.21 07.04.21 6 692 C KAIG3-DD-AG-A-0001 3

15 KAIG3 DD AG A FM 1004 3 L Aviary Ground floor Furniture Layout Back of House (Part-B) 04.05.21 18.05.21 10.05.21 6 659 C KAIG3-DD-AG-A-0001 4

16 KAIG3 DD NM A FM 1001 0 North Small Mosque Ground Floor Furniture Layout 06.08.20 20.08.20 10.08.20 4 932 C kAIG3-DD-NM-A-0002 0

17 KAIG3 DD NM A FM 1001 1 North Small Mosque Ground Floor Furniture Layout 09.09.20 23.09.20 12.09.20 3 899 C kAIG3-DD-NM-A-0002 1

18 KAIG3 DD NM A FM 1001 2 North Small Mosque Ground Floor Furniture Layout 15.09.20 29.09.20 16.09.20 1 895 C kAIG3-DD-NM-A-0002 2

19 KAIG3 DD NM A FM 1001 3 L North Small Mosque Ground Floor Furniture Layout 04.11.20 18.11.20 07.11.20 3 843 B kAIG3-DD-NM-A-0002 3

20 KAIG3 DD SA A FM 1001 0 South Administration Ground Floor Plan Furniture Layout 11.08.20 25.08.20 24.08.20 13 918 C KAIG3-DD-SA-A-0003 0

21 KAIG3 DD SA A FM 1001 1 L South Administration Ground Floor Plan Furniture Layout 30.08.20 13.09.20 05.09.20 6 906 B KAIG3-DD-SA-A-0003 1

22 KAIG3 DD SA A FM 1002 0 South Administration First Floor Plan Furniture Layout 11.08.20 25.08.20 24.08.20 13 918 C KAIG3-DD-SA-A-0003 0

23 KAIG3 DD SA A FM 1002 1 L South Administration First Floor Plan Furniture Layout 30.08.20 13.09.20 05.09.20 6 906 B KAIG3-DD-SA-A-0003 1

24 KAIG3 DD CC A FM 1001 0 L Child Care Ground Floor Plan Furniture Layout 17.08.20 31.08.20 23.08.20 6 919 B KAIG3-DD-CC-A-0004 0

25 KAIG3 DD LM A FM 1001 0 L Large Mosque Ground Floor Furniture Layout 13.09.20 27.09.20 16.09.20 3 895 B KAIG3-DD-LM-A-0005 0

26 KAIG3 DD SM A FM 1001 0 South Small Mosque Ground Floor Furniture Layout 13.09.20 27.09.20 16.09.20 3 895 C KAIG3-DD-SM-A-0006 0

27 KAIG3 DD SM A FM 1001 1 South Small Mosque Ground Floor Furniture Layout 12.10.20 26.10.20 19.10.20 7 862 C KAIG3-DD-SM-A-0006 1

28 KAIG3 DD SM A FM 1001 2 L South Small Mosque Ground Floor Furniture Layout 21.10.20 04.11.20 28.10.20 7 853 B KAIG3-DD-SM-A-0006 2

29 KAIG3 DD NA A FM 1001 0 North Administration Groud Floor Furniture Layout 20.09.20 04.10.20 07.10.20 17 874 C KAIG3-DD-NA-A-0007 0

30 KAIG3 DD NA A FM 1001 1 L North Administration Groud Floor Furniture Layout 17.10.20 31.10.20 28.10.20 11 853 B KAIG3-DD-NA-A-0007 1

31 KAIG3 DD NA A FM 1002 0 North Administration First Floor Furniture Layout 20.09.20 04.10.20 07.10.20 17 874 C KAIG3-DD-NA-A-0007 0

32 KAIG3 DD NA A FM 1002 1 L North Administration First Floor Furniture Layout 17.10.20 31.10.20 28.10.20 11 853 B KAIG3-DD-NA-A-0007 1

33 KAIG3 DD EC A GA 1001 0 Energy Center 2 Location Plan Layout 30.09.20 14.10.20 07.10.20 7 874 C KAIG3-DD-EC-A-0008 0

34 KAIG3 DD EC A GA 1001 1 Energy Center 2 Location Plan Layout 17.10.20 31.10.20 05.11.20 19 845 C KAIG3-DD-EC-A-0008 1

35 KAIG3 DD EC A GA 1001 2 Energy Center 2 Location Plan Layout 01.12.20 15.12.20 17.12.20 16 803 B KAIG3-DD-EC-A-0008 2

36 KAIG3 DD EC A GA 1001 3 Energy Center 2 Location Plan Layout 23.08.21 06.09.21 05.09.21 13 541 C KAIG3-DD-EC-A-0008 3

37 KAIG3 DD EC A GA 1001 4 Energy Center 2 Location Plan Layout 20.09.21 04.10.21 11.10.21 21 505 C KAIG3-DD-EC-A-0008 4
Submitted on 251021 withdraw
38 KAIG3 DD EC A GA 1001 5 L Energy Center 2 Location Plan Layout 11.11.21 25.11.21 16.11.21 5 469 B KAIG3-DD-EC-A-0008 5 on 111121/resubmitted on
111121

Page 3 of 111 M.Sarfraz


Consultant : DAR

Cancelled/ Total
Open Code A Code B Code C Code D
Superseded Received Main Contractor : ZHBG

0 0 77 74 0 1 154 DESIGN DRAWING SUBMITTAL REGISTER Sub Contractor :


Discipline :-ARCHITECT URAL
ARCHITECTURAL Rundate: 28-Feb-2023
Drawing Number Number of A B C D E
Latest Approval Average Days Number of
Sl No. Rev. Description Submitted Date Reeived Date Days with Submittal Reference Number Rev. Remarks
Rev. Required By Outstanding Days Held
ZHBG
39 KAIG3 DD EC A GA 1002 0 Energy Center 2 Ground & Roof Floor Plan Layout 30.09.20 14.10.20 07.10.20 7 874 C KAIG3-DD-EC-A-0008 0

40 KAIG3 DD EC A GA 1002 1 Energy Center 2 Ground & Roof Floor Plan Layout 17.10.20 31.10.20 05.11.20 19 845 B KAIG3-DD-EC-A-0008 1

41 KAIG3 DD EC A GA 1002 2 Energy Center 2 Ground & Roof Floor Plan Layout 23.08.21 06.09.21 05.09.21 13 541 C KAIG3-DD-EC-A-0008 3

42 KAIG3 DD EC A GA 1002 3 L Energy Center 2 Ground & Roof Floor Plan Layout 20.09.21 04.10.21 11.10.21 21 505 B KAIG3-DD-EC-A-0008 4

This drawing supersed with


43 KAIG3 DD EC A GA 1003 0 L Energy Center 2 Ground Floor Layout, Enlarge Plan 30.09.20 14.10.20 07.10.20 7 874 C KAIG3-DD-EC-A-0008 0
Drawing # 1005 & 1006

44 KAIG3 DD EC A GA 1004 0 Energy Center 2 Mezzanine & Trenches Level Layout 30.09.20 14.10.20 07.10.20 7 874 C KAIG3-DD-EC-A-0008 0

45 KAIG3 DD EC A GA 1004 1 Energy Center 2 Mezzanine & Trenches Level Layout 17.10.20 31.10.20 05.11.20 19 845 B KAIG3-DD-EC-A-0008 1

46 KAIG3 DD EC A GA 1004 2 Energy Center 2 Mezzanine & Trenches Level Layout 23.08.21 06.09.21 05.09.21 13 541 C KAIG3-DD-EC-A-0008 3

47 KAIG3 DD EC A GA 1004 3 L Energy Center 2 Mezzanine & Trenches Level Layout 20.09.21 04.10.21 11.10.21 21 505 B KAIG3-DD-EC-A-0008 4

48 KAIG3 DD EC A GA 1005 0 Energy Center 2 Ground Floor Layout Enlarge Plan (Part-B) 17.10.20 31.10.20 05.11.20 19 845 C KAIG3-DD-EC-A-0008 1

49 KAIG3 DD EC A GA 1005 1 Energy Center 2 Ground Floor Layout Enlarge Plan (Part-B) 01.12.20 15.12.20 17.12.20 16 803 B KAIG3-DD-EC-A-0008 2

50 KAIG3 DD EC A GA 1005 2 Energy Center 2 Ground Floor Layout Enlarge Plan (Part-B) 23.08.21 06.09.21 05.09.21 13 541 C KAIG3-DD-EC-A-0008 3

51 KAIG3 DD EC A GA 1005 3 L Energy Center 2 Ground Floor Layout Enlarge Plan (Part-B) 20.09.21 04.10.21 11.10.21 21 505 B KAIG3-DD-EC-A-0008 4

52 KAIG3 DD EC A GA 1006 0 Energy Center 2 Ground Floor Layout Enlarge Plan (Part-A) 17.10.20 31.10.20 05.11.20 19 845 B KAIG3-DD-EC-A-0008 1

53 KAIG3 DD EC A GA 1006 1 Energy Center 2 Ground Floor Layout Enlarge Plan (Part-A) 23.08.21 06.09.21 05.09.21 13 541 C KAIG3-DD-EC-A-0008 3

54 KAIG3 DD EC A GA 1006 2 L Energy Center 2 Ground Floor Layout Enlarge Plan (Part-A) 20.09.21 04.10.21 11.10.21 21 505 B KAIG3-DD-EC-A-0008 4

55 KAIG3 DD EC A GA 1007 0 Energy Center 2 Roof Floor Layout Enlarge Plan (Part-A) 23.08.21 06.09.21 05.09.21 13 541 C KAIG3-DD-EC-A-0008 3

56 KAIG3 DD EC A GA 1007 1 L Energy Center 2 Roof Floor Layout Enlarge Plan (Part-A) 20.09.21 04.10.21 11.10.21 21 505 B KAIG3-DD-EC-A-0008 4

57 KAIG3 DD EC A GA 1008 0 Energy Center 2 Roof Floor Layout Enlarge Plan (Part-B) 23.08.21 06.09.21 05.09.21 13 541 C KAIG3-DD-EC-A-0008 3

58 KAIG3 DD EC A GA 1008 1 L Energy Center 2 Roof Floor Layout Enlarge Plan (Part-B) 20.09.21 04.10.21 11.10.21 21 505 B KAIG3-DD-EC-A-0008 4

59 KAIG3 DD EC A GA 2001 0 Energy Center 2 Section B-B & D-D 30.09.20 14.10.20 07.10.20 7 874 B KAIG3-DD-EC-A-0008 0

60 KAIG3 DD EC A GA 2001 1 Energy Center 2 Section B-B & D-D 17.10.20 31.10.20 05.11.20 19 845 B KAIG3-DD-EC-A-0008 1

61 KAIG3 DD EC A GA 2001 2 Energy Center 2 Section B-B & D-D 23.08.21 06.09.21 05.09.21 13 541 C KAIG3-DD-EC-A-0008 3

62 KAIG3 DD EC A GA 2001 3 L Energy Center 2 Section B-B & D-D 20.09.21 04.10.21 11.10.21 21 505 B KAIG3-DD-EC-A-0008 4

63 KAIG3 DD EC A GA 2002 0 Energy Center 2 Section C-C 30.09.20 14.10.20 07.10.20 7 874 C KAIG3-DD-EC-A-0008 0

64 KAIG3 DD EC A GA 2002 1 Energy Center 2 Section C-C 17.10.20 31.10.20 05.11.20 19 845 C KAIG3-DD-EC-A-0008 1

65 KAIG3 DD EC A GA 2002 2 Energy Center 2 Section C-C 01.12.20 15.12.20 17.12.20 16 803 B KAIG3-DD-EC-A-0008 2

66 KAIG3 DD EC A GA 2002 3 Energy Center 2 Section C-C 23.08.21 06.09.21 05.09.21 13 541 C KAIG3-DD-EC-A-0008 3

67 KAIG3 DD EC A GA 2002 4 L Energy Center 2 Section C-C 20.09.21 04.10.21 11.10.21 21 505 B KAIG3-DD-EC-A-0008 4

68 KAIG3 DD EC A GA 2003 0 Energy Center 2 Section A-A 30.09.20 14.10.20 07.10.20 7 874 B KAIG3-DD-EC-A-0008 0

69 KAIG3 DD EC A GA 2003 1 Energy Center 2 Section A-A 17.10.20 31.10.20 05.11.20 19 845 C KAIG3-DD-EC-A-0008 1

70 KAIG3 DD EC A GA 2003 2 Energy Center 2 Section A-A 01.12.20 15.12.20 17.12.20 16 803 B KAIG3-DD-EC-A-0008 2

71 KAIG3 DD EC A GA 2003 3 Energy Center 2 Section A-A 23.08.21 06.09.21 05.09.21 13 541 C KAIG3-DD-EC-A-0008 3

72 KAIG3 DD EC A GA 2003 4 L Energy Center 2 Section A-A 20.09.21 04.10.21 11.10.21 21 505 B KAIG3-DD-EC-A-0008 4

73 KAIG3 DD EC A GA 3001 0 Energy Center 2 Front Elevation 1 30.09.20 14.10.20 07.10.20 7 874 B KAIG3-DD-EC-A-0008 0

74 KAIG3 DD EC A GA 3001 1 Energy Center 2 Front Elevation 1 17.10.20 31.10.20 05.11.20 19 845 C KAIG3-DD-EC-A-0008 1

75 KAIG3 DD EC A GA 3001 2 Energy Center 2 Front Elevation 1 01.12.20 15.12.20 17.12.20 16 803 B KAIG3-DD-EC-A-0008 2

76 KAIG3 DD EC A GA 3001 3 Energy Center 2 Front Elevation 1 23.08.21 06.09.21 05.09.21 13 541 C KAIG3-DD-EC-A-0008 3

77 KAIG3 DD EC A GA 3001 4 Energy Center 2 Front Elevation 1 20.09.21 04.10.21 11.10.21 21 505 C KAIG3-DD-EC-A-0008 4
Submitted on 251021 withdraw
78 KAIG3 DD EC A GA 3001 5 L Energy Center 2 Front Elevation 1 11.11.21 25.11.21 16.11.21 5 469 B KAIG3-DD-EC-A-0008 5 on 111121/resubmitted on
111121

Page 4 of 111 M.Sarfraz


Consultant : DAR

Cancelled/ Total
Open Code A Code B Code C Code D
Superseded Received Main Contractor : ZHBG

0 0 77 74 0 1 154 DESIGN DRAWING SUBMITTAL REGISTER Sub Contractor :


Discipline :-ARCHITECT URAL
ARCHITECTURAL Rundate: 28-Feb-2023
Drawing Number Number of A B C D E
Latest Approval Average Days Number of
Sl No. Rev. Description Submitted Date Reeived Date Days with Submittal Reference Number Rev. Remarks
Rev. Required By Outstanding Days Held
ZHBG
79 KAIG3 DD EC A GA 3002 0 Energy Center 2 Inner Elevation 1 30.09.20 14.10.20 07.10.20 7 874 C KAIG3-DD-EC-A-0008 0

80 KAIG3 DD EC A GA 3002 1 Energy Center 2 Inner Elevation 1 17.10.20 31.10.20 05.11.20 19 845 C KAIG3-DD-EC-A-0008 1

81 KAIG3 DD EC A GA 3002 2 Energy Center 2 Inner Elevation 1 01.12.20 15.12.20 17.12.20 16 803 B KAIG3-DD-EC-A-0008 2

82 KAIG3 DD EC A GA 3002 3 Energy Center 2 Inner Elevation 1 23.08.21 06.09.21 05.09.21 13 541 C KAIG3-DD-EC-A-0008 3

83 KAIG3 DD EC A GA 3002 4 Energy Center 2 Inner Elevation 1 20.09.21 04.10.21 11.10.21 21 505 C KAIG3-DD-EC-A-0008 4
Submitted on 251021 withdraw
84 KAIG3 DD EC A GA 3002 5 L Energy Center 2 Inner Elevation 1 11.11.21 25.11.21 16.11.21 5 469 B KAIG3-DD-EC-A-0008 5 on 111121/resubmitted on
111121
85 KAIG3 DD EC A GA 3003 0 Energy Center 2 Elevation -4 01.12.20 15.12.20 17.12.20 16 803 B KAIG3-DD-EC-A-0008 2

86 KAIG3 DD EC A GA 3003 1 Energy Center 2 Elevation -4 23.08.21 06.09.21 05.09.21 13 541 C KAIG3-DD-EC-A-0008 3

87 KAIG3 DD EC A GA 3003 2 Energy Center 2 Elevation -4 20.09.21 04.10.21 11.10.21 21 505 C KAIG3-DD-EC-A-0008 4
Submitted on 251021 withdraw
88 KAIG3 DD EC A GA 3003 3 L Energy Center 2 Elevation -4 11.11.21 25.11.21 16.11.21 5 469 B KAIG3-DD-EC-A-0008 5 on 111121/resubmitted on
111121
89 KAIG3 DD EC A GA 3004 0 Energy Center 2 Elevation - 3 & 5 01.12.20 15.12.20 17.12.20 16 803 B KAIG3-DD-EC-A-0008 2

90 KAIG3 DD EC A GA 3004 1 L Energy Center 2 Elevation - 3 & 5 23.08.21 06.09.21 05.09.21 13 541 B KAIG3-DD-EC-A-0008 3

91 KAIG3 DD EC A GA 7004 0 L Energy Center 2 Elevation 4 11.11.21 25.11.21 16.11.21 5 469 B KAIG3-DD-EC-A-0008 5

92 KAIG3 DD NU A GA 1001 0 L Nursery Sitting Out Plan 31.10.20 14.11.20 14.11.20 14 836 B KAIG3-DD-NU-A-0009 0

93 KAIG3 DD NU A GA 1002 0 L Nursery Ground Floor Plans 31.10.20 14.11.20 14.11.20 14 836 B KAIG3-DD-NU-A-0009 0

94 KAIG3 DD NU A GA 1003 0 L Nursery Roof Floor Plans 31.10.20 14.11.20 14.11.20 14 836 B KAIG3-DD-NU-A-0009 0

95 KAIG3 DD NU A GA 2001 0 L Nursery Section (A-A, B-B) 31.10.20 14.11.20 14.11.20 14 836 B KAIG3-DD-NU-A-0009 0

96 KAIG3 DD NU A GA 3001 0 L Nuersery Elevation 31.10.20 14.11.20 14.11.20 14 836 B KAIG3-DD-NU-A-0009 0

97 KAIG3 DD CC A GA 1001 0 Crescent Overall Zone-1 Internal Garden Location Plan 10.11.20 24.11.20 21.11.20 11 829 C KAIG3-DD-CO-A-0011 0

98 KAIG3 DD CC A GA 1001 1 L Crescent Overall Zone-1 Internal Garden Location Plan 24.12.20 07.01.21 14.01.21 21 775 B KAIG3-DD-CO-A-0011 1

99 KAIG3 DD CC A GA 1002 0 Crescent Overall Zone-1 Internal Garden Ground Floor Plan Part-1 10.11.20 24.11.20 21.11.20 11 829 C KAIG3-DD-CO-A-0011 0

100 KAIG3 DD CC A GA 1002 1 L Crescent Overall Zone-1 Internal Garden Ground Floor Plan Part-1 24.12.20 07.01.21 14.01.21 21 775 E KAIG3-DD-CO-A-0011 1

101 KAIG3 DD CC A GA 1003 0 Crescent Overall Zone-1 Internal Garden Ground Floor Plan Part-2 10.11.20 24.11.20 21.11.20 11 829 C KAIG3-DD-CO-A-0011 0

102 KAIG3 DD CC A GA 1003 1 L Crescent Overall Zone-1 Internal Garden Ground Floor Plan Part-2 24.12.20 07.01.21 14.01.21 21 775 E KAIG3-DD-CO-A-0011 1

103 KAIG3 DD CC A GA 2001 0 Crescent Overall Zone-01 Internal Garden with MCPE-04 Section A-A 10.11.20 24.11.20 21.11.20 11 829 C KAIG3-DD-CO-A-0011 0

104 KAIG3 DD CC A GA 2001 1 L Crescent Overall Zone-01 Internal Garden with MCPE-04 Section A-A 24.12.20 07.01.21 14.01.21 21 775 B KAIG3-DD-CO-A-0011 1

105 KAIG3 DD CC A GA 2002 0 Crescent Overall Zone-01 Internal Garden with MCPE-04 Section B-B 10.11.20 24.11.20 21.11.20 11 829 C KAIG3-DD-CO-A-0011 0

106 KAIG3 DD CC A GA 2002 1 L Crescent Overall Zone-01 Internal Garden with MCPE-04 Section B-B 24.12.20 07.01.21 14.01.21 21 775 B KAIG3-DD-CO-A-0011 1

107 KAIG3 DD CC A GA 2003 0 Crescent Overall Zone-01 Internal Garden with MCPE-04 Section C-C 10.11.20 24.11.20 21.11.20 11 829 C KAIG3-DD-CO-A-0011 0

108 KAIG3 DD CC A GA 2003 1 L Crescent Overall Zone-01 Internal Garden with MCPE-04 Section C-C 24.12.20 07.01.21 14.01.21 21 775 B KAIG3-DD-CO-A-0011 1

109 KAIG3 DD CC A GA 2004 0 Crescent Overall Zone-01 Internal Garden Section D-D (Part-01 of 02) 10.11.20 24.11.20 21.11.20 11 829 C KAIG3-DD-CO-A-0011 0

110 KAIG3 DD CC A GA 2004 1 L Crescent Overall Zone-01 Internal Garden Section D-D (Part-01 of 02) 24.12.20 07.01.21 14.01.21 21 775 B KAIG3-DD-CO-A-0011 1

111 KAIG3 DD CC A GA 2005 0 Crescent Overall Zone-01 Internal Garden Section D-D (Part-02 of 02) 10.11.20 24.11.20 21.11.20 11 829 C KAIG3-DD-CO-A-0011 0

112 KAIG3 DD CC A GA 2005 1 L Crescent Overall Zone-01 Internal Garden Section D-D (Part-02 of 02) 24.12.20 07.01.21 14.01.21 21 775 B KAIG3-DD-CO-A-0011 1

113 KAIG3 DD CC A GA 2006 0 Crescent Overall Zone-01 Internal Garden Section E-E 10.11.20 24.11.20 21.11.20 11 829 C KAIG3-DD-CO-A-0011 0

114 KAIG3 DD CC A GA 2006 1 L Crescent Overall Zone-01 Internal Garden Section E-E 24.12.20 07.01.21 14.01.21 21 775 B KAIG3-DD-CO-A-0011 1

Page 5 of 111 M.Sarfraz


Consultant : DAR

Cancelled/ Total
Open Code A Code B Code C Code D
Superseded Received Main Contractor : ZHBG

0 0 77 74 0 1 154 DESIGN DRAWING SUBMITTAL REGISTER Sub Contractor :


Discipline :-ARCHITECT URAL
ARCHITECTURAL Rundate: 28-Feb-2023
Drawing Number Number of A B C D E
Latest Approval Average Days Number of
Sl No. Rev. Description Submitted Date Reeived Date Days with Submittal Reference Number Rev. Remarks
Rev. Required By Outstanding Days Held
ZHBG
115 KAIG3 DD CC A GA 3001 0 Crescent Overall Zone-1 Inner Elevation (Part-1) 10.11.20 24.11.20 21.11.20 11 829 C KAIG3-DD-CO-A-0011 0

116 KAIG3 DD CC A GA 3001 1 L Crescent Overall Zone-1 Inner Elevation (Part-1) 24.12.20 07.01.21 14.01.21 21 775 B KAIG3-DD-CO-A-0011 1

117 KAIG3 DD CC A GA 3002 0 Crescent Overall Zone-1 Inner Elevation (Part-2) 10.11.20 24.11.20 21.11.20 11 829 C KAIG3-DD-CO-A-0011 0

118 KAIG3 DD CC A GA 3002 1 L Crescent Overall Zone-1 Inner Elevation (Part-2) 24.12.20 07.01.21 14.01.21 21 775 B KAIG3-DD-CO-A-0011 1

119 KAIG3 DD CC A GA 3003 0 Crescent Overall Zone-1 Outer Elevation (Part-1) (Sheet 01 of 03) 10.11.20 24.11.20 21.11.20 11 829 C KAIG3-DD-CO-A-0011 0

120 KAIG3 DD CC A GA 3003 1 L Crescent Overall Zone-1 Outer Elevation (Part-1) (Sheet 01 of 03) 24.12.20 07.01.21 14.01.21 21 775 B KAIG3-DD-CO-A-0011 1

121 KAIG3 DD CC A GA 3004 0 Crescent Overall Zone-1 Outer Elevation (Part-2) (Sheet 02 of 03) 10.11.20 24.11.20 21.11.20 11 829 C KAIG3-DD-CO-A-0011 0

122 KAIG3 DD CC A GA 3004 1 L Crescent Overall Zone-1 Outer Elevation (Part-2) (Sheet 02 of 03) 24.12.20 07.01.21 14.01.21 21 775 B KAIG3-DD-CO-A-0011 1

123 KAIG3 DD CC A GA 3005 0 Crescent Overall Zone-1 Outer Elevation (Part-3) (Sheet 03 of 03) 10.11.20 24.11.20 21.11.20 11 829 C KAIG3-DD-CO-A-0011 0

124 KAIG3 DD CC A GA 3005 1 L Crescent Overall Zone-1 Outer Elevation (Part-3) (Sheet 03 of 03) 24.12.20 07.01.21 14.01.21 21 775 B KAIG3-DD-CO-A-0011 1

125 KAIG3 DD CC A GA 7001 0 Crescent Overall Typical Wall Type A1 Details 10.11.20 24.11.20 21.11.20 11 829 C KAIG3-DD-CO-A-0011 0

126 KAIG3 DD CC A GA 7001 1 L Crescent Overall Typical Wall Type A1 Details 24.12.20 07.01.21 14.01.21 21 775 B KAIG3-DD-CO-A-0011 1

127 KAIG3 DD AG A GA 1001 0 Aviary Back of House Ground Floor Plan 16.11.20 30.11.20 02.12.20 16 818 C KAIG3-DD-AG-A-0012 0

128 KAIG3 DD AG A GA 1001 1 L Aviary Back of House Ground Floor Plan 12.12.20 26.12.20 21.12.20 9 799 B KAIG3-DD-AG-A-0012 1

129 KAIG3 DD AG A GA 1002 0 Aviary Back of House Internal Roof Plan 16.11.20 30.11.20 02.12.20 16 818 C KAIG3-DD-AG-A-0012 0

130 KAIG3 DD AG A GA 1002 1 Aviary Back of House Internal Roof Plan 12.12.20 26.12.20 21.12.20 9 799 C KAIG3-DD-AG-A-0012 1

131 KAIG3 DD AG A GA 1002 2 L Aviary Back of House Internal Roof Plan 11.03.21 25.03.21 18.03.21 7 712 C KAIG3-DD-AG-A-0012 2

132 KAIG3 DD MB A MS 1001 0 Management and Miantenance Building Kitchen Layout Plan 29.12.20 12.01.21 06.01.21 8 783 C KAIG3-DD-MB-A-0013 0

133 KAIG3 DD MB A MS 1001 1 Management and Miantenance Building Kitchen Layout Plan 07.02.21 21.02.21 25.02.21 18 733 C KAIG3-DD-MB-A-0013 1

134 KAIG3 DD MB A MS 1001 2 L Management and Miantenance Building Kitchen Layout Plan 08.04.21 22.04.21 12.04.21 4 687 B KAIG3-DD-MB-A-0013 2

135 KAIG3 DD MC A GA 1001 0 L MCPE 04 Location Plan @ +872.00 MSL 12.01.21 26.01.21 02.02.21 21 756 B KAIG3-DD-MC-A-0014 0

136 KAIG3 DD MC A GA 1002 0 L MCPE 04 Floor Plan @ +869.50 MSL 12.01.21 26.01.21 02.02.21 21 756 B KAIG3-DD-MC-A-0014 0

137 KAIG3 DD MC A GA 1003 0 L MCPE 04 Location Plan @ +866.00 MSL 12.01.21 26.01.21 02.02.21 21 756 B KAIG3-DD-MC-A-0014 0

138 KAIG3 DD MC A GA 1004 0 L MCPE 04 Location Plan @ +862.00 MSL 12.01.21 26.01.21 02.02.21 21 756 B KAIG3-DD-MC-A-0014 0

139 KAIG3 DD MC A GA 2001 0 L MCPE 04 (Crescent Zone-01) Section F-F, G-G 12.01.21 26.01.21 02.02.21 21 756 B KAIG3-DD-MC-A-0014 0

140 KAIG3 DD MC A GA 2002 0 L MCPE 04 (Crescent Zone-01) Section H-H, J-J 12.01.21 26.01.21 02.02.21 21 756 B KAIG3-DD-MC-A-0014 0

141 KAIG3 DD MC A GA 2003 0 L MCPE 04 (Crescent Zone-01) Section K-K, L-L 12.01.21 26.01.21 02.02.21 21 756 B KAIG3-DD-MC-A-0014 0

142 KAIG3 DD MC A GA 2004 0 L MCPE 04 (Crescent Zone-01) Section M-M, N-N 12.01.21 26.01.21 02.02.21 21 756 B KAIG3-DD-MC-A-0014 0

143 KAIG3 DD MC A GA 2005 0 L MCPE 04 (Crescent Zone-01) Section P-P, Q-Q, R-R 12.01.21 26.01.21 02.02.21 21 756 B KAIG3-DD-MC-A-0014 0

144 KAIG3 DD MC A GA 2006 0 L MCPE 04 (Crescent Zone-01) Section S-S (Part-01) 12.01.21 26.01.21 02.02.21 21 756 B KAIG3-DD-MC-A-0014 0

145 KAIG3 DD MC A GA 2007 0 L MCPE 04 (Crescent Zone-01) Section S-S (Part-02) 12.01.21 26.01.21 02.02.21 21 756 B KAIG3-DD-MC-A-0014 0

146 KAIG3 DD MB A MS 1002 0 Management amd Maintenance Building Kitchen Layout Plan 24.01.21 07.02.21 02.02.21 9 756 C KAIG3-DD-MB-A-0015 0

147 KAIG3 DD MB A MS 1002 1 L Management amd Maintenance Building Kitchen Layout Plan 16.03.21 30.03.21 21.03.21 5 709 B KAIG3-DD-MB-A-0015 1

Page 6 of 111 M.Sarfraz


Consultant : DAR

Cancelled/ Total
Open Code A Code B Code C Code D
Superseded Received Main Contractor : ZHBG

0 0 77 74 0 1 154 DESIGN DRAWING SUBMITTAL REGISTER Sub Contractor :


Discipline :-ARCHITECT URAL
ARCHITECTURAL Rundate: 28-Feb-2023
Drawing Number Number of A B C D E
Latest Approval Average Days Number of
Sl No. Rev. Description Submitted Date Reeived Date Days with Submittal Reference Number Rev. Remarks
Rev. Required By Outstanding Days Held
ZHBG
148 KAIG3 DD EC A FL 1001 0 L Energy Center 2 Ground Flooring Layout Part-A 17.02.21 03.03.21 27.03.21 38 703 B KAIG3-DD-EC-A-0016 0

149 KAIG3 DD EC A FL 1002 0 L Energy Center 2 Ground Flooring Layout Part-B 17.02.21 03.03.21 27.03.21 38 703 B KAIG3-DD-EC-A-0016 0

150 KAIG3 DD EC A RC 1001 0 Energy Center 2 Ground Reflected Ceiling Layout (Part-A) 21.02.21 07.03.21 04.03.21 11 726 C KAIG3-DD-EC-A-0017 0

151 KAIG3 DD EC A RC 1001 1 L Energy Center 2 Ground Reflected Ceiling Layout (Part-A) 08.03.21 22.03.21 10.03.21 2 720 C KAIG3-DD-EC-A-0017 1

152 KAIG3 DD EC A RC 1002 0 L Energy Center 2 Ground Reflected Ceiling Layout (Part-B) 21.02.21 07.03.21 04.03.21 11 726 B KAIG3-DD-EC-A-0017 0

153 KAIG3 DD AG A SS 7001 0 Aviary Garden Fabric Detials 21.06.21 05.07.21 06.07.21 15 602 C KAIG3-DD-AG-A-0018 0

154 KAIG3 DD AG A SS 7001 1 L Aviary Garden Fabric Detials 16.09.21 30.09.21 27.09.21 11 519 B KAIG3-DD-AG-A-0018 1

155 44985

156 44985

157 44985

158 44985

159 44985

160 44985

161 44985

162 44985

163 44985

164 44985

165 44985

166 44985

167 44985

168 44985

169 44985

170 44985

171 44985

172 44985

173 44985

174 44985

175 44985

176 44985

177 44985

178 44985

179 44985

180 44985

Page 7 of 111 M.Sarfraz


Consultant : DAR

Cancelled/ Total
Open Code A Code B Code C Code D
Superseded Received Main Contractor : ZHBG

0 0 77 74 0 1 154 DESIGN DRAWING SUBMITTAL REGISTER Sub Contractor :


Discipline :-ARCHITECT URAL
ARCHITECTURAL Rundate: 28-Feb-2023
Drawing Number Number of A B C D E
Latest Approval Average Days Number of
Sl No. Rev. Description Submitted Date Reeived Date Days with Submittal Reference Number Rev. Remarks
Rev. Required By Outstanding Days Held
ZHBG
181 44985

182 44985

183 44985

184 44985

185 44985

186 44985

187 44985

188 44985

189 44985

190 44985

191 44985

192 44985

193 44985

194 44985

195 44985

196 44985

197 44985

198 44985

199 44985

200 44985

201 44985

202 44985

203 44985

204 44985

205 44985

206 44985

207 44985

208 44985

209 44985

210 44985

211 44985

212 44985

213 44985

Page 8 of 111 M.Sarfraz


Consultant : DAR

Cancelled/ Total
Open Code A Code B Code C Code D
Superseded Received Main Contractor : ZHBG

0 0 77 74 0 1 154 DESIGN DRAWING SUBMITTAL REGISTER Sub Contractor :


Discipline :-ARCHITECT URAL
ARCHITECTURAL Rundate: 28-Feb-2023
Drawing Number Number of A B C D E
Latest Approval Average Days Number of
Sl No. Rev. Description Submitted Date Reeived Date Days with Submittal Reference Number Rev. Remarks
Rev. Required By Outstanding Days Held
ZHBG
214 44985

215 44985

216 44985

217 44985

218 44985

219 44985

220 44985

221 44985

222 44985

223 44985

224 44985

225 44985

226 44985

227 44985

228 44985

229 44985

230 44985

231 44985

232 44985

233 44985

234 44985

235 44985

236 44985

237 44985

238 44985

239 44985

240 44985

241 44985

242 44985

243 44985

244 44985

245 44985

246 44985

Page 9 of 111 M.Sarfraz


Consultant : DAR

Cancelled/ Total
Open Code A Code B Code C Code D
Superseded Received Main Contractor : ZHBG

0 0 77 74 0 1 154 DESIGN DRAWING SUBMITTAL REGISTER Sub Contractor :


Discipline :-ARCHITECT URAL
ARCHITECTURAL Rundate: 28-Feb-2023
Drawing Number Number of A B C D E
Latest Approval Average Days Number of
Sl No. Rev. Description Submitted Date Reeived Date Days with Submittal Reference Number Rev. Remarks
Rev. Required By Outstanding Days Held
ZHBG
247 44985

248 44985

249 44985

250 44985

251 44985

252 44985

253 44985

254 44985

255 44985

256 44985

257 44985

258 44985

259 44985

260 44985

261 44985

262 44985

263 44985

264 44985

265 44985

266 44985

267 44985

268 44985

269 44985

270 44985

271 44985

272 44985

273 44985

274 44985 44985

Page 10 of 111 M.Sarfraz


Consultant : DAR
Cancell
Total
ed/
Open Code A Code B Code C Code D code NA Receiv
Supers
ed Main Contractor : ZHBG
eded
0 0 0 6 0 0 0 6 DESIGN DRAWING SUBMITTAL REGISTER (GEN) Sub Contractor :
Discipline : Electrical
ELECTRICAL-Power Rundat 28-Feb-2023
Drawing Number
Approval
Sl No. Rev. Description Submitted Date Received Date Submittal Reference Number Rev. Remarks
Required By
Project Contracto Building Discpline Dwg No

1260 KAIG3 DD EC E CR 1101 0 Site Plan Energy Center 1 Power Containment Layout Ground Floor ( Attached Earthing & Lightning Protection Calculations ) 26.09.22 10.10.22 01.10.22 KAIG3-DD-EC-E-0102-00 0

1262 KAIG3 DD EC E GR 1101 0 Site Plan Energy Center 1 Earthing & Lightning Layout Ground & Roof Floors ( Attached Cable Tray Calculations ) 26.09.22 10.10.22 01.10.22 KAIG3-DD-EC-E-0102-00 0

1264 KAIG3 DD EC E LD 1101 0 Site Plan Energy Center 1 Lighting Layout Ground Floor ( Attached Lighting Calculations ) 26.09.22 10.10.22 01.10.22 KAIG3-DD-EC-E-0102-00 0

1266 KAIG3 DD EC E PB 8101 0 Site Plan Energy Center 1 Panel Boards Schedules 26.09.22 10.10.22 01.10.22 KAIG3-DD-EC-E-0102-00 0

1268 KAIG3 DD EC E PD 1101 0 Site Plan Energy Center 1 Power Layout Ground Floor 26.09.22 10.10.22 01.10.22 KAIG3-DD-EC-E-0102-00 0

1270 KAIG3 DD EC E PD 1101 0 Site Plan Energy Center 1 Medium Voltage Riser 26.09.22 10.10.22 01.10.22 KAIG3-DD-EC-E-0102-00 0

Page 11 of 111 M.Sarfraz


Consultant : DAR

0
Cancelled/
Total
Open Code A Code B Code C Code D Code N/A Supersede
Received
d Main Contractor : ZHBG

Design Drawing Submitted

Superseded / Cancelled
0 0 0 4 0 0 0 4 DESIGN DRAWING SUBMITTAL REGISTER (GEN) Sub Contractor :

More than 14 days


Discipline : Electrical

For Information
ELECTRICAL-Low Current

Under Review
Rundate 28-Feb-2023

Code N/A
Drawing Number

Code A

Code B

Code C

Code D
Latest Approval
Sl No. Rev. Description Submitted Date Received Date Submittal Reference Number Rev. Remarks
Rev. Required By
Project Contracto Building Discpline Dwg No <5 Days 5 - 10 Days >10 Days
0 0 0 0

1
705 KAIG3 DD EC LC CR 1101 0 Site Plan Energy Center 1 Low Current Containment Layout 26.09.22 10.10.22 01.10.22 KAIG3-DD-EC-LC-0050 0 1 1 0

707 KAIG3 DD EC LC FA 1101 0 Site Plan Energy Center 1 Fire Alarm Layout 26.09.22 10.10.22 01.10.22 KAIG3-DD-EC-LC-0050 0 1 1 0

709 KAIG3 DD EC LC SI 1101 0 Site Plan Energy Center 1 Security Layout 26.09.22 10.10.22 01.10.22 KAIG3-DD-EC-LC-0050 0 1 1 0

711 KAIG3 DD EC LC VD 1101 0 Site Plan Energy Center 1 Low Current Layout 26.09.22 10.10.22 01.10.22 KAIG3-DD-EC-LC-0050 0 1 1 0

Page 12 of 111 M.Sarfraz


Consultant : DAR

0
Cancelled/
Total
Open Code A Code B Code C Code D Code N/A Supersede
Received
d Main Contractor : ZHBG

Design Drawing Submitted

Superseded / Cancelled
0 0 0 4 0 0 0 4 DESIGN DRAWING SUBMITTAL REGISTER (GEN) Sub Contractor :

More than 14 days


Discipline : Electrical

For Information
ELECTRICAL-Low Current

Under Review
Rundate 28-Feb-2023

Code N/A
Drawing Number

Code A

Code B

Code C

Code D
Latest Approval
Sl No. Rev. Description Submitted Date Received Date Submittal Reference Number Rev. Remarks
Rev. Required By

Page 13 of 111 M.Sarfraz


Consultant : DAR

0
Cancelled/
Total
Open Code A Code B Code C Code D Code N/A Supersede
Received
d Main Contractor : ZHBG

Design Drawing Submitted

Superseded / Cancelled
0 0 0 4 0 0 0 4 DESIGN DRAWING SUBMITTAL REGISTER (GEN) Sub Contractor :

More than 14 days


Discipline : Electrical

For Information
ELECTRICAL-Low Current

Under Review
Rundate 28-Feb-2023

Code N/A
Drawing Number

Code A

Code B

Code C

Code D
Latest Approval
Sl No. Rev. Description Submitted Date Received Date Submittal Reference Number Rev. Remarks
Rev. Required By

Page 14 of 111 M.Sarfraz


Consultant : DAR

0
Cancelled/
Total
Open Code A Code B Code C Code D Code N/A Supersede
Received
d Main Contractor : ZHBG

Design Drawing Submitted

Superseded / Cancelled
0 0 0 4 0 0 0 4 DESIGN DRAWING SUBMITTAL REGISTER (GEN) Sub Contractor :

More than 14 days


Discipline : Electrical

For Information
ELECTRICAL-Low Current

Under Review
Rundate 28-Feb-2023

Code N/A
Drawing Number

Code A

Code B

Code C

Code D
Latest Approval
Sl No. Rev. Description Submitted Date Received Date Submittal Reference Number Rev. Remarks
Rev. Required By

Page 15 of 111 M.Sarfraz


Consultant : DAR

0
Cancelled/
Total
Open Code A Code B Code C Code D Code N/A Supersede
Received
d Main Contractor : ZHBG

Design Drawing Submitted

Superseded / Cancelled
0 0 0 4 0 0 0 4 DESIGN DRAWING SUBMITTAL REGISTER (GEN) Sub Contractor :

More than 14 days


Discipline : Electrical

For Information
ELECTRICAL-Low Current

Under Review
Rundate 28-Feb-2023

Code N/A
Drawing Number

Code A

Code B

Code C

Code D
Latest Approval
Sl No. Rev. Description Submitted Date Received Date Submittal Reference Number Rev. Remarks
Rev. Required By

Page 16 of 111 M.Sarfraz


Consultant : DAR

0
Cancelled/
Total
Open Code A Code B Code C Code D Code N/A Supersede
Received
d Main Contractor : ZHBG

Design Drawing Submitted

Superseded / Cancelled
0 0 0 4 0 0 0 4 DESIGN DRAWING SUBMITTAL REGISTER (GEN) Sub Contractor :

More than 14 days


Discipline : Electrical

For Information
ELECTRICAL-Low Current

Under Review
Rundate 28-Feb-2023

Code N/A
Drawing Number

Code A

Code B

Code C

Code D
Latest Approval
Sl No. Rev. Description Submitted Date Received Date Submittal Reference Number Rev. Remarks
Rev. Required By

Page 17 of 111 M.Sarfraz


Consultant : DAR

0
Cancelled/
Total
Open Code A Code B Code C Code D Code N/A Supersede
Received
d Main Contractor : ZHBG

Design Drawing Submitted

Superseded / Cancelled
0 0 0 4 0 0 0 4 DESIGN DRAWING SUBMITTAL REGISTER (GEN) Sub Contractor :

More than 14 days


Discipline : Electrical

For Information
ELECTRICAL-Low Current

Under Review
Rundate 28-Feb-2023

Code N/A
Drawing Number

Code A

Code B

Code C

Code D
Latest Approval
Sl No. Rev. Description Submitted Date Received Date Submittal Reference Number Rev. Remarks
Rev. Required By

Page 18 of 111 M.Sarfraz


Consultant : DAR

0
Cancelled/
Total
Open Code A Code B Code C Code D Code N/A Supersede
Received
d Main Contractor : ZHBG

Design Drawing Submitted

Superseded / Cancelled
0 0 0 4 0 0 0 4 DESIGN DRAWING SUBMITTAL REGISTER (GEN) Sub Contractor :

More than 14 days


Discipline : Electrical

For Information
ELECTRICAL-Low Current

Under Review
Rundate 28-Feb-2023

Code N/A
Drawing Number

Code A

Code B

Code C

Code D
Latest Approval
Sl No. Rev. Description Submitted Date Received Date Submittal Reference Number Rev. Remarks
Rev. Required By

Page 19 of 111 M.Sarfraz


Consultant : DAR

0
Cancelled/
Total
Open Code A Code B Code C Code D Code N/A Supersede
Received
d Main Contractor : ZHBG

Design Drawing Submitted

Superseded / Cancelled
0 0 0 4 0 0 0 4 DESIGN DRAWING SUBMITTAL REGISTER (GEN) Sub Contractor :

More than 14 days


Discipline : Electrical

For Information
ELECTRICAL-Low Current

Under Review
Rundate 28-Feb-2023

Code N/A
Drawing Number

Code A

Code B

Code C

Code D
Latest Approval
Sl No. Rev. Description Submitted Date Received Date Submittal Reference Number Rev. Remarks
Rev. Required By

Page 20 of 111 M.Sarfraz


Consultant : DAR

0
Cancelled/
Total
Open Code A Code B Code C Code D Code N/A Supersede
Received
d Main Contractor : ZHBG

Design Drawing Submitted

Superseded / Cancelled
0 0 0 4 0 0 0 4 DESIGN DRAWING SUBMITTAL REGISTER (GEN) Sub Contractor :

More than 14 days


Discipline : Electrical

For Information
ELECTRICAL-Low Current

Under Review
Rundate 28-Feb-2023

Code N/A
Drawing Number

Code A

Code B

Code C

Code D
Latest Approval
Sl No. Rev. Description Submitted Date Received Date Submittal Reference Number Rev. Remarks
Rev. Required By

Page 21 of 111 M.Sarfraz


Consultant : DAR

0
Cancelled/
Total
Open Code A Code B Code C Code D Code N/A Supersede
Received
d Main Contractor : ZHBG

Design Drawing Submitted

Superseded / Cancelled
0 0 0 4 0 0 0 4 DESIGN DRAWING SUBMITTAL REGISTER (GEN) Sub Contractor :

More than 14 days


Discipline : Electrical

For Information
ELECTRICAL-Low Current

Under Review
Rundate 28-Feb-2023

Code N/A
Drawing Number

Code A

Code B

Code C

Code D
Latest Approval
Sl No. Rev. Description Submitted Date Received Date Submittal Reference Number Rev. Remarks
Rev. Required By

Page 22 of 111 M.Sarfraz


Consultant : DAR

0
Cancelled/
Total
Open Code A Code B Code C Code D Code N/A Supersede
Received
d Main Contractor : ZHBG

Design Drawing Submitted

Superseded / Cancelled
0 0 0 4 0 0 0 4 DESIGN DRAWING SUBMITTAL REGISTER (GEN) Sub Contractor :

More than 14 days


Discipline : Electrical

For Information
ELECTRICAL-Low Current

Under Review
Rundate 28-Feb-2023

Code N/A
Drawing Number

Code A

Code B

Code C

Code D
Latest Approval
Sl No. Rev. Description Submitted Date Received Date Submittal Reference Number Rev. Remarks
Rev. Required By

Page 23 of 111 M.Sarfraz


Consultant : DAR

0
Cancelled/
Total
Open Code A Code B Code C Code D Code N/A Supersede
Received
d Main Contractor : ZHBG

Design Drawing Submitted

Superseded / Cancelled
0 0 0 4 0 0 0 4 DESIGN DRAWING SUBMITTAL REGISTER (GEN) Sub Contractor :

More than 14 days


Discipline : Electrical

For Information
ELECTRICAL-Low Current

Under Review
Rundate 28-Feb-2023

Code N/A
Drawing Number

Code A

Code B

Code C

Code D
Latest Approval
Sl No. Rev. Description Submitted Date Received Date Submittal Reference Number Rev. Remarks
Rev. Required By

Page 24 of 111 M.Sarfraz


Consultant : DAR

0
Cancelled/
Total
Open Code A Code B Code C Code D Code N/A Supersede
Received
d Main Contractor : ZHBG

Design Drawing Submitted

Superseded / Cancelled
0 0 0 4 0 0 0 4 DESIGN DRAWING SUBMITTAL REGISTER (GEN) Sub Contractor :

More than 14 days


Discipline : Electrical

For Information
ELECTRICAL-Low Current

Under Review
Rundate 28-Feb-2023

Code N/A
Drawing Number

Code A

Code B

Code C

Code D
Latest Approval
Sl No. Rev. Description Submitted Date Received Date Submittal Reference Number Rev. Remarks
Rev. Required By

Page 25 of 111 M.Sarfraz


Consultant : DAR

0
Cancelled/
Total
Open Code A Code B Code C Code D Code N/A Supersede
Received
d Main Contractor : ZHBG

Design Drawing Submitted

Superseded / Cancelled
0 0 0 4 0 0 0 4 DESIGN DRAWING SUBMITTAL REGISTER (GEN) Sub Contractor :

More than 14 days


Discipline : Electrical

For Information
ELECTRICAL-Low Current

Under Review
Rundate 28-Feb-2023

Code N/A
Drawing Number

Code A

Code B

Code C

Code D
Latest Approval
Sl No. Rev. Description Submitted Date Received Date Submittal Reference Number Rev. Remarks
Rev. Required By

Page 26 of 111 M.Sarfraz


Consultant : DAR

0
Cancelled/
Total
Open Code A Code B Code C Code D Code N/A Supersede
Received
d Main Contractor : ZHBG

Design Drawing Submitted

Superseded / Cancelled
0 0 0 4 0 0 0 4 DESIGN DRAWING SUBMITTAL REGISTER (GEN) Sub Contractor :

More than 14 days


Discipline : Electrical

For Information
ELECTRICAL-Low Current

Under Review
Rundate 28-Feb-2023

Code N/A
Drawing Number

Code A

Code B

Code C

Code D
Latest Approval
Sl No. Rev. Description Submitted Date Received Date Submittal Reference Number Rev. Remarks
Rev. Required By

Page 27 of 111 M.Sarfraz


Consultant : DAR

0
Cancelled/
Total
Open Code A Code B Code C Code D Code N/A Supersede
Received
d Main Contractor : ZHBG

Design Drawing Submitted

Superseded / Cancelled
0 0 0 4 0 0 0 4 DESIGN DRAWING SUBMITTAL REGISTER (GEN) Sub Contractor :

More than 14 days


Discipline : Electrical

For Information
ELECTRICAL-Low Current

Under Review
Rundate 28-Feb-2023

Code N/A
Drawing Number

Code A

Code B

Code C

Code D
Latest Approval
Sl No. Rev. Description Submitted Date Received Date Submittal Reference Number Rev. Remarks
Rev. Required By

Page 28 of 111 M.Sarfraz


Consultant : DAR

0
Cancelled/
Total
Open Code A Code B Code C Code D Code N/A Supersede
Received
d Main Contractor : ZHBG

Design Drawing Submitted

Superseded / Cancelled
0 0 0 4 0 0 0 4 DESIGN DRAWING SUBMITTAL REGISTER (GEN) Sub Contractor :

More than 14 days


Discipline : Electrical

For Information
ELECTRICAL-Low Current

Under Review
Rundate 28-Feb-2023

Code N/A
Drawing Number

Code A

Code B

Code C

Code D
Latest Approval
Sl No. Rev. Description Submitted Date Received Date Submittal Reference Number Rev. Remarks
Rev. Required By

Page 29 of 111 M.Sarfraz


Consultant : DAR

0
Cancelled/
Total
Open Code A Code B Code C Code D Code N/A Supersede
Received
d Main Contractor : ZHBG

Design Drawing Submitted

Superseded / Cancelled
0 0 0 4 0 0 0 4 DESIGN DRAWING SUBMITTAL REGISTER (GEN) Sub Contractor :

More than 14 days


Discipline : Electrical

For Information
ELECTRICAL-Low Current

Under Review
Rundate 28-Feb-2023

Code N/A
Drawing Number

Code A

Code B

Code C

Code D
Latest Approval
Sl No. Rev. Description Submitted Date Received Date Submittal Reference Number Rev. Remarks
Rev. Required By

Page 30 of 111 M.Sarfraz


Consultant : DAR

0
Cancelled/
Total
Open Code A Code B Code C Code D Code N/A Supersede
Received
d Main Contractor : ZHBG

Design Drawing Submitted

Superseded / Cancelled
0 0 0 4 0 0 0 4 DESIGN DRAWING SUBMITTAL REGISTER (GEN) Sub Contractor :

More than 14 days


Discipline : Electrical

For Information
ELECTRICAL-Low Current

Under Review
Rundate 28-Feb-2023

Code N/A
Drawing Number

Code A

Code B

Code C

Code D
Latest Approval
Sl No. Rev. Description Submitted Date Received Date Submittal Reference Number Rev. Remarks
Rev. Required By

Page 31 of 111 M.Sarfraz


Consultant : DAR

0
Cancelled/
Total
Open Code A Code B Code C Code D Code N/A Supersede
Received
d Main Contractor : ZHBG

Design Drawing Submitted

Superseded / Cancelled
0 0 0 4 0 0 0 4 DESIGN DRAWING SUBMITTAL REGISTER (GEN) Sub Contractor :

More than 14 days


Discipline : Electrical

For Information
ELECTRICAL-Low Current

Under Review
Rundate 28-Feb-2023

Code N/A
Drawing Number

Code A

Code B

Code C

Code D
Latest Approval
Sl No. Rev. Description Submitted Date Received Date Submittal Reference Number Rev. Remarks
Rev. Required By

Page 32 of 111 M.Sarfraz


Consultant : DAR

0
Cancelled/
Total
Open Code A Code B Code C Code D Code N/A Supersede
Received
d Main Contractor : ZHBG

Design Drawing Submitted

Superseded / Cancelled
0 0 0 4 0 0 0 4 DESIGN DRAWING SUBMITTAL REGISTER (GEN) Sub Contractor :

More than 14 days


Discipline : Electrical

For Information
ELECTRICAL-Low Current

Under Review
Rundate 28-Feb-2023

Code N/A
Drawing Number

Code A

Code B

Code C

Code D
Latest Approval
Sl No. Rev. Description Submitted Date Received Date Submittal Reference Number Rev. Remarks
Rev. Required By

Page 33 of 111 M.Sarfraz


Consultant : DAR

0
Cancelled/
Total
Open Code A Code B Code C Code D Code N/A Supersede
Received
d Main Contractor : ZHBG

Design Drawing Submitted

Superseded / Cancelled
0 0 0 4 0 0 0 4 DESIGN DRAWING SUBMITTAL REGISTER (GEN) Sub Contractor :

More than 14 days


Discipline : Electrical

For Information
ELECTRICAL-Low Current

Under Review
Rundate 28-Feb-2023

Code N/A
Drawing Number

Code A

Code B

Code C

Code D
Latest Approval
Sl No. Rev. Description Submitted Date Received Date Submittal Reference Number Rev. Remarks
Rev. Required By

Page 34 of 111 M.Sarfraz


Consultant : DAR

0
Cancelled/
Total
Open Code A Code B Code C Code D Code N/A Supersede
Received
d Main Contractor : ZHBG

Design Drawing Submitted

Superseded / Cancelled
0 0 0 4 0 0 0 4 DESIGN DRAWING SUBMITTAL REGISTER (GEN) Sub Contractor :

More than 14 days


Discipline : Electrical

For Information
ELECTRICAL-Low Current

Under Review
Rundate 28-Feb-2023

Code N/A
Drawing Number

Code A

Code B

Code C

Code D
Latest Approval
Sl No. Rev. Description Submitted Date Received Date Submittal Reference Number Rev. Remarks
Rev. Required By

Page 35 of 111 M.Sarfraz


Consultant : DAR

0
Cancelled/
Total
Open Code A Code B Code C Code D Code N/A Supersede
Received
d Main Contractor : ZHBG

Design Drawing Submitted

Superseded / Cancelled
0 0 0 4 0 0 0 4 DESIGN DRAWING SUBMITTAL REGISTER (GEN) Sub Contractor :

More than 14 days


Discipline : Electrical

For Information
ELECTRICAL-Low Current

Under Review
Rundate 28-Feb-2023

Code N/A
Drawing Number

Code A

Code B

Code C

Code D
Latest Approval
Sl No. Rev. Description Submitted Date Received Date Submittal Reference Number Rev. Remarks
Rev. Required By

Page 36 of 111 M.Sarfraz


Consultant : DAR

0
Cancelled/
Total
Open Code A Code B Code C Code D Code N/A Supersede
Received
d Main Contractor : ZHBG

Design Drawing Submitted

Superseded / Cancelled
0 0 0 4 0 0 0 4 DESIGN DRAWING SUBMITTAL REGISTER (GEN) Sub Contractor :

More than 14 days


Discipline : Electrical

For Information
ELECTRICAL-Low Current

Under Review
Rundate 28-Feb-2023

Code N/A
Drawing Number

Code A

Code B

Code C

Code D
Latest Approval
Sl No. Rev. Description Submitted Date Received Date Submittal Reference Number Rev. Remarks
Rev. Required By

Page 37 of 111 M.Sarfraz


Consultant : DAR

0
Cancelled/
Total
Open Code A Code B Code C Code D Code N/A Supersede
Received
d Main Contractor : ZHBG

Design Drawing Submitted

Superseded / Cancelled
0 0 0 4 0 0 0 4 DESIGN DRAWING SUBMITTAL REGISTER (GEN) Sub Contractor :

More than 14 days


Discipline : Electrical

For Information
ELECTRICAL-Low Current

Under Review
Rundate 28-Feb-2023

Code N/A
Drawing Number

Code A

Code B

Code C

Code D
Latest Approval
Sl No. Rev. Description Submitted Date Received Date Submittal Reference Number Rev. Remarks
Rev. Required By

Page 38 of 111 M.Sarfraz


Consultant : DAR

0
Cancelled/
Total
Open Code A Code B Code C Code D Code N/A Supersede
Received
d Main Contractor : ZHBG

Design Drawing Submitted

Superseded / Cancelled
0 0 0 4 0 0 0 4 DESIGN DRAWING SUBMITTAL REGISTER (GEN) Sub Contractor :

More than 14 days


Discipline : Electrical

For Information
ELECTRICAL-Low Current

Under Review
Rundate 28-Feb-2023

Code N/A
Drawing Number

Code A

Code B

Code C

Code D
Latest Approval
Sl No. Rev. Description Submitted Date Received Date Submittal Reference Number Rev. Remarks
Rev. Required By

Page 39 of 111 M.Sarfraz


Consultant : DAR

0
Cancelled/
Total
Open Code A Code B Code C Code D Code N/A Supersede
Received
d Main Contractor : ZHBG

Design Drawing Submitted

Superseded / Cancelled
0 0 0 4 0 0 0 4 DESIGN DRAWING SUBMITTAL REGISTER (GEN) Sub Contractor :

More than 14 days


Discipline : Electrical

For Information
ELECTRICAL-Low Current

Under Review
Rundate 28-Feb-2023

Code N/A
Drawing Number

Code A

Code B

Code C

Code D
Latest Approval
Sl No. Rev. Description Submitted Date Received Date Submittal Reference Number Rev. Remarks
Rev. Required By

Page 40 of 111 M.Sarfraz


Consultant : DAR

0
Cancelled/
Total
Open Code A Code B Code C Code D Code N/A Supersede
Received
d Main Contractor : ZHBG

Design Drawing Submitted

Superseded / Cancelled
0 0 0 4 0 0 0 4 DESIGN DRAWING SUBMITTAL REGISTER (GEN) Sub Contractor :

More than 14 days


Discipline : Electrical

For Information
ELECTRICAL-Low Current

Under Review
Rundate 28-Feb-2023

Code N/A
Drawing Number

Code A

Code B

Code C

Code D
Latest Approval
Sl No. Rev. Description Submitted Date Received Date Submittal Reference Number Rev. Remarks
Rev. Required By

Page 41 of 111 M.Sarfraz


Consultant : DAR

0
Cancelled/
Total
Open Code A Code B Code C Code D Code N/A Supersede
Received
d Main Contractor : ZHBG

Design Drawing Submitted

Superseded / Cancelled
0 0 0 4 0 0 0 4 DESIGN DRAWING SUBMITTAL REGISTER (GEN) Sub Contractor :

More than 14 days


Discipline : Electrical

For Information
ELECTRICAL-Low Current

Under Review
Rundate 28-Feb-2023

Code N/A
Drawing Number

Code A

Code B

Code C

Code D
Latest Approval
Sl No. Rev. Description Submitted Date Received Date Submittal Reference Number Rev. Remarks
Rev. Required By

Page 42 of 111 M.Sarfraz


Consultant : DAR

0
Cancelled/
Total
Open Code A Code B Code C Code D Code N/A Supersede
Received
d Main Contractor : ZHBG

Design Drawing Submitted

Superseded / Cancelled
0 0 0 4 0 0 0 4 DESIGN DRAWING SUBMITTAL REGISTER (GEN) Sub Contractor :

More than 14 days


Discipline : Electrical

For Information
ELECTRICAL-Low Current

Under Review
Rundate 28-Feb-2023

Code N/A
Drawing Number

Code A

Code B

Code C

Code D
Latest Approval
Sl No. Rev. Description Submitted Date Received Date Submittal Reference Number Rev. Remarks
Rev. Required By

Page 43 of 111 M.Sarfraz


Consultant : DAR

0
Cancelled/
Total
Open Code A Code B Code C Code D Code N/A Supersede
Received
d Main Contractor : ZHBG

Design Drawing Submitted

Superseded / Cancelled
0 0 0 4 0 0 0 4 DESIGN DRAWING SUBMITTAL REGISTER (GEN) Sub Contractor :

More than 14 days


Discipline : Electrical

For Information
ELECTRICAL-Low Current

Under Review
Rundate 28-Feb-2023

Code N/A
Drawing Number

Code A

Code B

Code C

Code D
Latest Approval
Sl No. Rev. Description Submitted Date Received Date Submittal Reference Number Rev. Remarks
Rev. Required By

Page 44 of 111 M.Sarfraz


Consultant : DAR

0
Cancelled/
Total
Open Code A Code B Code C Code D Code N/A Supersede
Received
d Main Contractor : ZHBG

Design Drawing Submitted

Superseded / Cancelled
0 0 0 4 0 0 0 4 DESIGN DRAWING SUBMITTAL REGISTER (GEN) Sub Contractor :

More than 14 days


Discipline : Electrical

For Information
ELECTRICAL-Low Current

Under Review
Rundate 28-Feb-2023

Code N/A
Drawing Number

Code A

Code B

Code C

Code D
Latest Approval
Sl No. Rev. Description Submitted Date Received Date Submittal Reference Number Rev. Remarks
Rev. Required By

Page 45 of 111 M.Sarfraz


Consultant : DAR

0
Cancelled/
Total
Open Code A Code B Code C Code D Code N/A Supersede
Received
d Main Contractor : ZHBG

Design Drawing Submitted

Superseded / Cancelled
0 0 0 4 0 0 0 4 DESIGN DRAWING SUBMITTAL REGISTER (GEN) Sub Contractor :

More than 14 days


Discipline : Electrical

For Information
ELECTRICAL-Low Current

Under Review
Rundate 28-Feb-2023

Code N/A
Drawing Number

Code A

Code B

Code C

Code D
Latest Approval
Sl No. Rev. Description Submitted Date Received Date Submittal Reference Number Rev. Remarks
Rev. Required By

Page 46 of 111 M.Sarfraz


Consultant : DAR

0
Cancelled/
Total
Open Code A Code B Code C Code D Code N/A Supersede
Received
d Main Contractor : ZHBG

Design Drawing Submitted

Superseded / Cancelled
0 0 0 4 0 0 0 4 DESIGN DRAWING SUBMITTAL REGISTER (GEN) Sub Contractor :

More than 14 days


Discipline : Electrical

For Information
ELECTRICAL-Low Current

Under Review
Rundate 28-Feb-2023

Code N/A
Drawing Number

Code A

Code B

Code C

Code D
Latest Approval
Sl No. Rev. Description Submitted Date Received Date Submittal Reference Number Rev. Remarks
Rev. Required By

Page 47 of 111 M.Sarfraz


Consultant : DAR

0
Cancelled/
Total
Open Code A Code B Code C Code D Code N/A Supersede
Received
d Main Contractor : ZHBG

Design Drawing Submitted

Superseded / Cancelled
0 0 0 4 0 0 0 4 DESIGN DRAWING SUBMITTAL REGISTER (GEN) Sub Contractor :

More than 14 days


Discipline : Electrical

For Information
ELECTRICAL-Low Current

Under Review
Rundate 28-Feb-2023

Code N/A
Drawing Number

Code A

Code B

Code C

Code D
Latest Approval
Sl No. Rev. Description Submitted Date Received Date Submittal Reference Number Rev. Remarks
Rev. Required By

Page 48 of 111 M.Sarfraz


Consultant : DAR

0
Cancelled/
Total
Open Code A Code B Code C Code D Code N/A Supersede
Received
d Main Contractor : ZHBG

Design Drawing Submitted

Superseded / Cancelled
0 0 0 4 0 0 0 4 DESIGN DRAWING SUBMITTAL REGISTER (GEN) Sub Contractor :

More than 14 days


Discipline : Electrical

For Information
ELECTRICAL-Low Current

Under Review
Rundate 28-Feb-2023

Code N/A
Drawing Number

Code A

Code B

Code C

Code D
Latest Approval
Sl No. Rev. Description Submitted Date Received Date Submittal Reference Number Rev. Remarks
Rev. Required By

Page 49 of 111 M.Sarfraz


Consultant : DAR

0
Cancelled/
Total
Open Code A Code B Code C Code D Code N/A Supersede
Received
d Main Contractor : ZHBG

Design Drawing Submitted

Superseded / Cancelled
0 0 0 4 0 0 0 4 DESIGN DRAWING SUBMITTAL REGISTER (GEN) Sub Contractor :

More than 14 days


Discipline : Electrical

For Information
ELECTRICAL-Low Current

Under Review
Rundate 28-Feb-2023

Code N/A
Drawing Number

Code A

Code B

Code C

Code D
Latest Approval
Sl No. Rev. Description Submitted Date Received Date Submittal Reference Number Rev. Remarks
Rev. Required By

Page 50 of 111 M.Sarfraz


Consultant : DAR

0
Cancelled/
Total
Open Code A Code B Code C Code D Code N/A Supersede
Received
d Main Contractor : ZHBG

Design Drawing Submitted

Superseded / Cancelled
0 0 0 4 0 0 0 4 DESIGN DRAWING SUBMITTAL REGISTER (GEN) Sub Contractor :

More than 14 days


Discipline : Electrical

For Information
ELECTRICAL-Low Current

Under Review
Rundate 28-Feb-2023

Code N/A
Drawing Number

Code A

Code B

Code C

Code D
Latest Approval
Sl No. Rev. Description Submitted Date Received Date Submittal Reference Number Rev. Remarks
Rev. Required By

Page 51 of 111 M.Sarfraz


Consultant : DAR

0
Cancelled/
Total
Open Code A Code B Code C Code D Code N/A Supersede
Received
d Main Contractor : ZHBG

Design Drawing Submitted

Superseded / Cancelled
0 0 0 4 0 0 0 4 DESIGN DRAWING SUBMITTAL REGISTER (GEN) Sub Contractor :

More than 14 days


Discipline : Electrical

For Information
ELECTRICAL-Low Current

Under Review
Rundate 28-Feb-2023

Code N/A
Drawing Number

Code A

Code B

Code C

Code D
Latest Approval
Sl No. Rev. Description Submitted Date Received Date Submittal Reference Number Rev. Remarks
Rev. Required By

Page 52 of 111 M.Sarfraz


Consultant : DAR

0
Cancelled/
Total
Open Code A Code B Code C Code D Code N/A Supersede
Received
d Main Contractor : ZHBG

Design Drawing Submitted

Superseded / Cancelled
0 0 0 4 0 0 0 4 DESIGN DRAWING SUBMITTAL REGISTER (GEN) Sub Contractor :

More than 14 days


Discipline : Electrical

For Information
ELECTRICAL-Low Current

Under Review
Rundate 28-Feb-2023

Code N/A
Drawing Number

Code A

Code B

Code C

Code D
Latest Approval
Sl No. Rev. Description Submitted Date Received Date Submittal Reference Number Rev. Remarks
Rev. Required By

Page 53 of 111 M.Sarfraz


Consultant : DAR

0
Cancelled/
Total
Open Code A Code B Code C Code D Code N/A Supersede
Received
d Main Contractor : ZHBG

Design Drawing Submitted

Superseded / Cancelled
0 0 0 4 0 0 0 4 DESIGN DRAWING SUBMITTAL REGISTER (GEN) Sub Contractor :

More than 14 days


Discipline : Electrical

For Information
ELECTRICAL-Low Current

Under Review
Rundate 28-Feb-2023

Code N/A
Drawing Number

Code A

Code B

Code C

Code D
Latest Approval
Sl No. Rev. Description Submitted Date Received Date Submittal Reference Number Rev. Remarks
Rev. Required By

Page 54 of 111 M.Sarfraz


Consultant : DAR

0
Cancelled/
Total
Open Code A Code B Code C Code D Code N/A Supersede
Received
d Main Contractor : ZHBG

Design Drawing Submitted

Superseded / Cancelled
0 0 0 4 0 0 0 4 DESIGN DRAWING SUBMITTAL REGISTER (GEN) Sub Contractor :

More than 14 days


Discipline : Electrical

For Information
ELECTRICAL-Low Current

Under Review
Rundate 28-Feb-2023

Code N/A
Drawing Number

Code A

Code B

Code C

Code D
Latest Approval
Sl No. Rev. Description Submitted Date Received Date Submittal Reference Number Rev. Remarks
Rev. Required By

Page 55 of 111 M.Sarfraz


Consultant : DAR

0
Cancelled/
Total
Open Code A Code B Code C Code D Code N/A Supersede
Received
d Main Contractor : ZHBG

Design Drawing Submitted

Superseded / Cancelled
0 0 0 4 0 0 0 4 DESIGN DRAWING SUBMITTAL REGISTER (GEN) Sub Contractor :

More than 14 days


Discipline : Electrical

For Information
ELECTRICAL-Low Current

Under Review
Rundate 28-Feb-2023

Code N/A
Drawing Number

Code A

Code B

Code C

Code D
Latest Approval
Sl No. Rev. Description Submitted Date Received Date Submittal Reference Number Rev. Remarks
Rev. Required By

Page 56 of 111 M.Sarfraz


Consultant : DAR

0
Cancelled/
Total
Open Code A Code B Code C Code D Code N/A Supersede
Received
d Main Contractor : ZHBG

Design Drawing Submitted

Superseded / Cancelled
0 0 0 4 0 0 0 4 DESIGN DRAWING SUBMITTAL REGISTER (GEN) Sub Contractor :

More than 14 days


Discipline : Electrical

For Information
ELECTRICAL-Low Current

Under Review
Rundate 28-Feb-2023

Code N/A
Drawing Number

Code A

Code B

Code C

Code D
Latest Approval
Sl No. Rev. Description Submitted Date Received Date Submittal Reference Number Rev. Remarks
Rev. Required By

Page 57 of 111 M.Sarfraz


Consultant : DAR

0
Cancelled/
Total
Open Code A Code B Code C Code D Code N/A Supersede
Received
d Main Contractor : ZHBG

Design Drawing Submitted

Superseded / Cancelled
0 0 0 4 0 0 0 4 DESIGN DRAWING SUBMITTAL REGISTER (GEN) Sub Contractor :

More than 14 days


Discipline : Electrical

For Information
ELECTRICAL-Low Current

Under Review
Rundate 28-Feb-2023

Code N/A
Drawing Number

Code A

Code B

Code C

Code D
Latest Approval
Sl No. Rev. Description Submitted Date Received Date Submittal Reference Number Rev. Remarks
Rev. Required By

Page 58 of 111 M.Sarfraz


Consultant : DAR

0
Cancelled/
Total
Open Code A Code B Code C Code D Code N/A Supersede
Received
d Main Contractor : ZHBG

Design Drawing Submitted

Superseded / Cancelled
0 0 0 4 0 0 0 4 DESIGN DRAWING SUBMITTAL REGISTER (GEN) Sub Contractor :

More than 14 days


Discipline : Electrical

For Information
ELECTRICAL-Low Current

Under Review
Rundate 28-Feb-2023

Code N/A
Drawing Number

Code A

Code B

Code C

Code D
Latest Approval
Sl No. Rev. Description Submitted Date Received Date Submittal Reference Number Rev. Remarks
Rev. Required By

Page 59 of 111 M.Sarfraz


Consultant : DAR

0
Cancelled/
Total
Open Code A Code B Code C Code D Code N/A Supersede
Received
d Main Contractor : ZHBG

Design Drawing Submitted

Superseded / Cancelled
0 0 0 4 0 0 0 4 DESIGN DRAWING SUBMITTAL REGISTER (GEN) Sub Contractor :

More than 14 days


Discipline : Electrical

For Information
ELECTRICAL-Low Current

Under Review
Rundate 28-Feb-2023

Code N/A
Drawing Number

Code A

Code B

Code C

Code D
Latest Approval
Sl No. Rev. Description Submitted Date Received Date Submittal Reference Number Rev. Remarks
Rev. Required By

Page 60 of 111 M.Sarfraz


Consultant : DAR

0
Cancelled/
Total
Open Code A Code B Code C Code D Code N/A Supersede
Received
d Main Contractor : ZHBG

Design Drawing Submitted

Superseded / Cancelled
0 0 0 4 0 0 0 4 DESIGN DRAWING SUBMITTAL REGISTER (GEN) Sub Contractor :

More than 14 days


Discipline : Electrical

For Information
ELECTRICAL-Low Current

Under Review
Rundate 28-Feb-2023

Code N/A
Drawing Number

Code A

Code B

Code C

Code D
Latest Approval
Sl No. Rev. Description Submitted Date Received Date Submittal Reference Number Rev. Remarks
Rev. Required By

Page 61 of 111 M.Sarfraz


Consultant : DAR

0
Cancelled/
Total
Open Code A Code B Code C Code D Code N/A Supersede
Received
d Main Contractor : ZHBG

Design Drawing Submitted

Superseded / Cancelled
0 0 0 4 0 0 0 4 DESIGN DRAWING SUBMITTAL REGISTER (GEN) Sub Contractor :

More than 14 days


Discipline : Electrical

For Information
ELECTRICAL-Low Current

Under Review
Rundate 28-Feb-2023

Code N/A
Drawing Number

Code A

Code B

Code C

Code D
Latest Approval
Sl No. Rev. Description Submitted Date Received Date Submittal Reference Number Rev. Remarks
Rev. Required By

Page 62 of 111 M.Sarfraz


Consultant : DAR

0
Cancelled/
Total
Open Code A Code B Code C Code D Code N/A Supersede
Received
d Main Contractor : ZHBG

Design Drawing Submitted

Superseded / Cancelled
0 0 0 4 0 0 0 4 DESIGN DRAWING SUBMITTAL REGISTER (GEN) Sub Contractor :

More than 14 days


Discipline : Electrical

For Information
ELECTRICAL-Low Current

Under Review
Rundate 28-Feb-2023

Code N/A
Drawing Number

Code A

Code B

Code C

Code D
Latest Approval
Sl No. Rev. Description Submitted Date Received Date Submittal Reference Number Rev. Remarks
Rev. Required By

Page 63 of 111 M.Sarfraz


Consultant : DAR

0
Cancelled/
Total
Open Code A Code B Code C Code D Code N/A Supersede
Received
d Main Contractor : ZHBG

Design Drawing Submitted

Superseded / Cancelled
0 0 0 4 0 0 0 4 DESIGN DRAWING SUBMITTAL REGISTER (GEN) Sub Contractor :

More than 14 days


Discipline : Electrical

For Information
ELECTRICAL-Low Current

Under Review
Rundate 28-Feb-2023

Code N/A
Drawing Number

Code A

Code B

Code C

Code D
Latest Approval
Sl No. Rev. Description Submitted Date Received Date Submittal Reference Number Rev. Remarks
Rev. Required By

Page 64 of 111 M.Sarfraz


Consultant : DAR

0
Cancelled/
Total
Open Code A Code B Code C Code D Code N/A Supersede
Received
d Main Contractor : ZHBG

Design Drawing Submitted

Superseded / Cancelled
0 0 0 4 0 0 0 4 DESIGN DRAWING SUBMITTAL REGISTER (GEN) Sub Contractor :

More than 14 days


Discipline : Electrical

For Information
ELECTRICAL-Low Current

Under Review
Rundate 28-Feb-2023

Code N/A
Drawing Number

Code A

Code B

Code C

Code D
Latest Approval
Sl No. Rev. Description Submitted Date Received Date Submittal Reference Number Rev. Remarks
Rev. Required By

Page 65 of 111 M.Sarfraz


Consultant : DAR

0
Cancelled/
Total
Open Code A Code B Code C Code D Code N/A Supersede
Received
d Main Contractor : ZHBG

Design Drawing Submitted

Superseded / Cancelled
0 0 0 4 0 0 0 4 DESIGN DRAWING SUBMITTAL REGISTER (GEN) Sub Contractor :

More than 14 days


Discipline : Electrical

For Information
ELECTRICAL-Low Current

Under Review
Rundate 28-Feb-2023

Code N/A
Drawing Number

Code A

Code B

Code C

Code D
Latest Approval
Sl No. Rev. Description Submitted Date Received Date Submittal Reference Number Rev. Remarks
Rev. Required By

Page 66 of 111 M.Sarfraz


DESIGN DRAWINGS SUBMITTAL CODE C SUMMARY DETA

LATEST
SN# DRAWING#
REV.

1 KAIG3-DD-EC-E-CR-1101-00 L

2 KAIG3-DD-EC-E-GR-1101-00 L

3 KAIG3-DD-EC-E-LD-1101-00 L

4 KAIG3-DD-EC-E-PB-8101-00 L

5 KAIG3-DD-EC-E-PD-1101-00 L

6 KAIG3-DD-EC-E-PD-6101-00 L

7 KAIG3-DD-EC-LC-CR-1101-00 L

8 KAIG3-DD-EC-LC-FA-1101-00 L

9 KAIG3-DD-EC-LC-SI-1101-00 L

10 KAIG3-DD-EC-LC-VD-1101-00 L
DESIGN DRAWINGS SUBMITTAL CODE C SUMMARY DETAILS FROM AUGUST 10,2022 UP TO NOVEMBER 16,2022

SUBMITTED
DESCRIPTION DISCIPLINE
DATE

Site Plan Energy Center 1 Power Containment Layout Ground Floor ( Attached Earthing
E 26-Sep-22
& Lightning Protection Calculations )

Site Plan Energy Center 1 Earthing & Lightning Layout Ground & Roof Floors ( Attached
E 26-Sep-22
Cable Tray Calculations )

Site Plan Energy Center 1 Lighting Layout Ground Floor ( Attached Lighting Calculations
E 26-Sep-22
)

Site Plan Energy Center 1 Panel Boards Schedules E 26-Sep-22

Site Plan Energy Center 1 Power Layout Ground Floor E 26-Sep-22

Site Plan Energy Center 1 Medium Voltage Riser E 26-Sep-22

Site Plan Energy Center 1 Low Current Containment Layout LC 26-Sep-22

Site Plan Energy Center 1 Fire Alarm Layout LC 26-Sep-22

Site Plan Energy Center 1 Security Layout LC 26-Sep-22

Site Plan Energy Center 1 Low Current Layout LC 26-Sep-22

DISCIPLINE TOTAL

ELECTRICAL 6

LOW CURRENT 4

TOTAL 10
UP TO NOVEMBER 16,2022

REQUIRED
RECEIVED
APPROVAL TRANSMITTAL# REV.
DATE
DATE

10-Oct-22 1-Oct-22 KAIG3-DD-EC-E-0102 0

10-Oct-22 1-Oct-22 KAIG3-DD-EC-E-0102 0

10-Oct-22 1-Oct-22 KAIG3-DD-EC-E-0102 0

10-Oct-22 1-Oct-22 KAIG3-DD-EC-E-0102 0

10-Oct-22 1-Oct-22 KAIG3-DD-EC-E-0102 0

10-Oct-22 1-Oct-22 KAIG3-DD-EC-E-0102 0

10-Oct-22 1-Oct-22 KAIG3-DD-EC-LC-0050 0

10-Oct-22 1-Oct-22 KAIG3-DD-EC-LC-0050 0

10-Oct-22 1-Oct-22 KAIG3-DD-EC-LC-0050 0

10-Oct-22 1-Oct-22 KAIG3-DD-EC-LC-0050 0


481

146

178
Consultant : DAR

59

98
0

0
Cancelled/ Total
Open Code A Code B Code C Code D N/A Supersede submitt
d ed Main Contractor : ZHBG

Shop Drawing Submitted

Superseded / Cancelled
0 0 146 178 0 98 59 481 DESIGN DRAWING SUBMITTAL REGISTER Sub Contractor :
Discipline : Mechanical

For Information
MECHANICAL

Under Review
Rundate: 28-Feb-2023

Code N/A
Drawing Number Number of A B C D

Code A

Code B

Code C

Code D
Approval Average Days Number of
Sl No. Rev. Latest Rev. Description Submitted Date Received Date Days with Submittal Reference Number Rev. Remarks
Required By Outstanding Days Held
Project Contracto Building Discpline Dwg No ZHBG

As Meeting on 270420 PD, MEP,


1 KAIG3 DD CC M HP 1003 0 L Crescent 2 Reception & Child Care Pipework Layout Ground Floor 07.11.19 21.11.19 11.11.19 4 1205 KAIG3-DWG-CC-M-0001 0 1 1
Mohanad drawings not valid
As Meeting on 270420 PD, MEP,
2 KAIG3 DD CC M HP 1004 0 L Crescent 2 Reception & Child Care Pipework Layout Roof Floor 07.11.19 21.11.19 11.11.19 4 1205 KAIG3-DWG-CC-M-0001 0 1 1
Mohanad drawings not valid
As Meeting on 270420 PD, MEP,
3 KAIG3 DD CC M HP 8006 0 L Crescent 2 Reception & Child Care Pipework Schematics 07.11.19 21.11.19 11.11.19 4 1205 KAIG3-DWG-CC-M-0001 0 1 1
Mohanad drawings not valid
As Meeting on 270420 PD, MEP,
4 KAIG3 DD CC M HV 1001 0 L Crescent 2 Reception & Child Care Ventilaton Ground Floor 07.11.19 21.11.19 11.11.19 4 1205 KAIG3-DWG-CC-M-0001 0 1 1
Mohanad drawings not valid
As Meeting on 270420 PD, MEP,
5 KAIG3 DD CC M HV 1002 0 L Crescent 2 Reception & Child Care Ventilaton Roof Floor 07.11.19 21.11.19 11.11.19 4 1205 KAIG3-DWG-CC-M-0001 0 1 1
Mohanad drawings not valid
As Meeting on 270420 PD, MEP,
6 KAIG3 DD CC M HV 8005 0 L Crescent 2 Reception & Child Care Ventilaton Schematics 07.11.19 21.11.19 11.11.19 4 1205 KAIG3-DWG-CC-M-0001 0 1 1
Mohanad drawings not valid
As Meeting on 270420 PD, MEP,
7 KAIG3 DD CC M HV 8007 0 L Crescent 2 Reception & Child Care Ventilation Schedule of Equipement 07.11.19 21.11.19 11.11.19 4 1205 KAIG3-DWG-CC-M-0001 0 1 1
Mohanad drawings not valid
As Meeting on 270420 PD, MEP,
8 KAIG3 DD AG M HP 1005 0 L Site Aviary Garden Pipe Work Layout Ground Floor 09.11.19 23.11.19 13.11.19 4 1203 C KAIG3-DWG-AG-M-0002 0 1 1
Mohanad drawings not valid
As Meeting on 270420 PD, MEP,
9 KAIG3 DD AG M HP 1006 0 L Site Aviary Garden Pipe Work Layout First Floor 09.11.19 23.11.19 13.11.19 4 1203 B KAIG3-DWG-AG-M-0002 0 1 1
Mohanad drawings not valid
As Meeting on 270420 PD, MEP,
10 KAIG3 DD AG M HP 8010 0 L Site Aviary Garden Pipework Schematics 09.11.19 23.11.19 13.11.19 4 1203 C KAIG3-DWG-AG-M-0002 0 1 1
Mohanad drawings not valid
As Meeting on 270420 PD, MEP,
11 KAIG3 DD AG M HP 8011 0 L Site Aviary Garden Schedule of Equipment Schedule 1 of 2 09.11.19 23.11.19 13.11.19 4 1203 C KAIG3-DWG-AG-M-0002 0 1 1
Mohanad drawings not valid
As Meeting on 270420 PD, MEP,
12 KAIG3 DD AG M HP 8012 0 L Site Aviary Garden Schedule of Equipment Schedule 2 of 2 09.11.19 23.11.19 13.11.19 4 1203 C KAIG3-DWG-AG-M-0002 0 1 1
Mohanad drawings not valid
As Meeting on 270420 PD, MEP,
13 KAIG3 DD AG M HV 1001 0 L Site Aviary Garden Ventilation Layout Ground Floor 09.11.19 23.11.19 13.11.19 4 1203 C KAIG3-DWG-AG-M-0002 0 1 1
Mohanad drawings not valid
As Meeting on 270420 PD, MEP,
14 KAIG3 DD AG M HV 1002 0 L Site Aviary Garden Ventilation Layout First Floor 09.11.19 23.11.19 13.11.19 4 1203 B KAIG3-DWG-AG-M-0002 0 1 1
Mohanad drawings not valid
As Meeting on 270420 PD, MEP,
15 KAIG3 DD AG M HV 1003 0 L Site Aviary Garden Ventilation Layout Back Of House 09.11.19 23.11.19 13.11.19 4 1203 B KAIG3-DWG-AG-M-0002 0 1 1
Mohanad drawings not valid
As Meeting on 270420 PD, MEP,
16 KAIG3 DD AG M HV 1004 0 L Site Aviary Garden Ventilation layout Front of House 09.11.19 23.11.19 13.11.19 4 1203 B KAIG3-DWG-AG-M-0002 0 1 1
Mohanad drawings not valid
As Meeting on 270420 PD, MEP,
17 KAIG3 DD AG M HV 8007 0 L Site Aviary Garden Ventilation Schematic Sheet 1 of 3 09.11.19 23.11.19 13.11.19 4 1203 C KAIG3-DWG-AG-M-0002 0 1 1
Mohanad drawings not valid
As Meeting on 270420 PD, MEP,
18 KAIG3 DD AG M HV 8008 0 L Site Aviary Garden Ventilation Schematic Sheet 2 of 3 09.11.19 23.11.19 13.11.19 4 1203 B KAIG3-DWG-AG-M-0002 0 1 1
Mohanad drawings not valid
As Meeting on 270420 PD, MEP,
19 KAIG3 DD AG M HV 8009 0 L Site Aviary Garden Ventilation Schematic Sheet 3 of 3 09.11.19 23.11.19 13.11.19 4 1203 C KAIG3-DWG-AG-M-0002 0 1 1
Mohanad drawings not valid
As Meeting on 270420 PD, MEP,
20 KAIG3 DD NR M HP 1002 0 L Crescent 1 North Restaurant Pipework Layout Ground Floor 09.11.19 23.11.19 18.11.19 9 1198 B KAIG3-DWG-NR-M-0003 0 1 1
Mohanad drawings not valid
As Meeting on 270420 PD, MEP,
21 KAIG3 DD NR M HP 8005 0 L Crescent 1 North Restaurant Pipework Schematic 09.11.19 23.11.19 18.11.19 9 1198 C KAIG3-DWG-NR-M-0003 0 1 1
Mohanad drawings not valid
As Meeting on 270420 PD, MEP,
22 KAIG3 DD NR M HV 1001 0 L Crescent 1 North Restaurant Ventilation Layout Ground Floor 09.11.19 23.11.19 18.11.19 9 1198 B KAIG3-DWG-NR-M-0003 0 1 1
Mohanad drawings not valid
As Meeting on 270420 PD, MEP,
23 KAIG3 DD NR M HV 2003 0 L Crescent 1 North Restaurant Sections and Details 09.11.19 23.11.19 18.11.19 9 1198 B KAIG3-DWG-NR-M-0003 0 1 1
Mohanad drawings not valid
As Meeting on 270420 PD, MEP,
24 KAIG3 DD NR M HV 8004 0 L Crescent 1 North Restaurant Ventilation Schemati 09.11.19 23.11.19 18.11.19 9 1198 B KAIG3-DWG-NR-M-0003 0 1 1
Mohanad drawings not valid
As Meeting on 270420 PD, MEP,
25 KAIG3 DD NR M HV 8006 0 L Crescent 1 North Restaurant Plant Room and Sections 09.11.19 23.11.19 18.11.19 9 1198 B KAIG3-DWG-NR-M-0003 0 1 1
Mohanad drawings not valid
As Meeting on 270420 PD, MEP,
26 KAIG3 DD NR M HV 8007 0 L Crescent 1 North Restaurant Schedule of Equipment 09.11.19 23.11.19 18.11.19 9 1198 C KAIG3-DWG-NR-M-0003 0 1 1
Mohanad drawings not valid
As Meeting on 270420 PD, MEP,
27 KAIG3 DD NT M HV 1001 0 L Crescent 1 North Watch Tower Ventilation Layout Ground Floor 07.11.19 21.11.19 11.11.19 4 1205 B KAIG3-DWG-NT-M-0004 0 1 1
Mohanad drawings not valid
As Meeting on 270420 PD, MEP,
28 KAIG3 DD NT M HV 2002 0 L Crescent 1 North Watch Tower Section A-A 07.11.19 21.11.19 11.11.19 4 1205 B KAIG3-DWG-NT-M-0004 0 1 1
Mohanad drawings not valid
As Meeting on 270420 PD, MEP,
29 KAIG3 DD MB M HP 1003 0 L Site Management & Maintenance Pipework Layout Ground Floor 09.11.19 23.11.19 18.11.19 9 1198 B KAIG3-DWG-MB-M-0005 0 1 1
Mohanad drawings not valid
As Meeting on 270420 PD, MEP,
30 KAIG3 DD MB M HP 1004 0 L Site Management & Maintenance Pipework Layout Roof Fl 09.11.19 23.11.19 18.11.19 9 1198 B KAIG3-DWG-MB-M-0005 0 1 1
Mohanad drawings not valid
As Meeting on 270420 PD, MEP,
31 KAIG3 DD MB M HP 8008 0 L Site Management & Maintenance Pipework Schematics 09.11.19 23.11.19 18.11.19 9 1198 C KAIG3-DWG-MB-M-0005 0 1 1
Mohanad drawings not valid
As Meeting on 270420 PD, MEP,
32 KAIG3 DD MB M HV 1001 0 L Site Management & Maintenance Ventilation Layout Ground Floor 09.11.19 23.11.19 18.11.19 9 1198 B KAIG3-DWG-MB-M-0005 0 1 1
Mohanad drawings not valid
As Meeting on 270420 PD, MEP,
33 KAIG3 DD MB M HV 1002 0 L Site Management & Maintenance Ventilation Layout Roof Floor 09.11.19 23.11.19 18.11.19 9 1198 B KAIG3-DWG-MB-M-0005 0 1 1
Mohanad drawings not valid
As Meeting on 270420 PD, MEP,
34 KAIG3 DD MB M HV 8005 0 L Site Management & Maintenance Ventilation Schematics (Sheet 1 of 3) 09.11.19 23.11.19 18.11.19 9 1198 C KAIG3-DWG-MB-M-0005 0 1 1
Mohanad drawings not valid
As Meeting on 270420 PD, MEP,
35 KAIG3 DD MB M HV 8006 0 L Site Management & Maintenance Ventilation Schematics (Sheet 2 of 3) 09.11.19 23.11.19 18.11.19 9 1198 C KAIG3-DWG-MB-M-0005 0 1 1
Mohanad drawings not valid
As Meeting on 270420 PD, MEP,
36 KAIG3 DD MB M HV 8007 0 L Site Management & Maintenance Ventilation Schematics (Sheet 3 of 3) 09.11.19 23.11.19 18.11.19 9 1198 C KAIG3-DWG-MB-M-0005 0 1 1
Mohanad drawings not valid
As Meeting on 270420 PD, MEP,
37 KAIG3 DD MB M HV 8009 0 L Site Management & Maintenance Schedule of Equipment (Sheet 1 of 2) 09.11.19 23.11.19 18.11.19 9 1198 C KAIG3-DWG-MB-M-0005 0 1 1
Mohanad drawings not valid
As Meeting on 270420 PD, MEP,
38 KAIG3 DD MB M HV 8010 0 L Site Management & Maintenance Schedule of Equipment (Sheet 2 of 2) 09.11.19 23.11.19 18.11.19 9 1198 C KAIG3-DWG-MB-M-0005 0 1 1
Mohanad drawings not valid
As Meeting on 270420 PD, MEP,
39 KAIG3 DD NM M HP 1004 0 L Crescent 1 North Small Mosque Pipe work Layout Ground Floor 10.11.19 24.11.19 18.11.19 8 1198 C KAIG3-DWG-NM-M-0008 0 1 1
Mohanad drawings not valid
As Meeting on 270420 PD, MEP,
40 KAIG3 DD NM M HP 1005 0 L Crescent 1 North Small Mosque Pipe work Layout First Floor 10.11.19 24.11.19 18.11.19 8 1198 C KAIG3-DWG-NM-M-0008 0 1 1
Mohanad drawings not valid
As Meeting on 270420 PD, MEP,
41 KAIG3 DD NM M HP 1006 0 L Crescent 1 North Small Mosque Pipe work Layout Roof Floor 10.11.19 24.11.19 18.11.19 8 1198 C KAIG3-DWG-NM-M-0008 0 1 1
Mohanad drawings not valid
As Meeting on 270420 PD, MEP,
42 KAIG3 DD NM M HP 8009 0 L Crescent 1 North Small Mosque Pipe Work Schematics 10.11.19 24.11.19 18.11.19 8 1198 C KAIG3-DWG-NM-M-0008 0 1 1
Mohanad drawings not valid
As Meeting on 270420 PD, MEP,
43 KAIG3 DD NM M HP 8010 0 L Crescent 1 North Small Mosque Schedule of Equiment 10.11.19 24.11.19 18.11.19 8 1198 C KAIG3-DWG-NM-M-0008 0 1 1
Mohanad drawings not valid
As Meeting on 270420 PD, MEP,
44 KAIG3 DD NM M HV 1001 0 L Crescent 1 North Small Mosque Ventilation Layout Ground Floor 10.11.19 24.11.19 18.11.19 8 1198 C KAIG3-DWG-NM-M-0008 0 1 1
Mohanad drawings not valid
As Meeting on 270420 PD, MEP,
45 KAIG3 DD NM M HV 1002 0 L Crescent 1 North Small Mosque Ventilation Layout First Floor 10.11.19 24.11.19 18.11.19 8 1198 C KAIG3-DWG-NM-M-0008 0 1 1
Mohanad drawings not valid
As Meeting on 270420 PD, MEP,
46 KAIG3 DD NM M HV 1003 0 L Crescent 1 North Small Mosque Ventilation Layout Roof Floor 10.11.19 24.11.19 18.11.19 8 1198 C KAIG3-DWG-NM-M-0008 0 1 1
Mohanad drawings not valid
As Meeting on 270420 PD, MEP,
47 KAIG3 DD NM M HV 2007 0 L Crescent 1 North Small Mosque Sections 10.11.19 24.11.19 18.11.19 8 1198 C KAIG3-DWG-NM-M-0008 0 1 1
Mohanad drawings not valid

Page 70 of 111 M.Sarfraz


481

146

178
Consultant : DAR

59

98
0

0
Cancelled/ Total
Open Code A Code B Code C Code D N/A Supersede submitt
d ed Main Contractor : ZHBG

Shop Drawing Submitted

Superseded / Cancelled
0 0 146 178 0 98 59 481 DESIGN DRAWING SUBMITTAL REGISTER Sub Contractor :
Discipline : Mechanical

For Information
MECHANICAL

Under Review
Rundate: 28-Feb-2023

Code N/A
Drawing Number Number of A B C D

Code A

Code B

Code C

Code D
Approval Average Days Number of
Sl No. Rev. Latest Rev. Description Submitted Date Received Date Days with Submittal Reference Number Rev. Remarks
Required By Outstanding Days Held As Meeting on 270420 PD, MEP,
48 KAIG3 DD NM M HV 8008 0 L Crescent 1 North Small Mosque Ventilation Schematics 10.11.19 24.11.19 18.11.19 8 ZHBG
1198 C KAIG3-DWG-NM-M-0008 0 1 1
Mohanad drawings not valid
As Meeting on 270420 PD, MEP,
49 KAIG3 DD NA M HP 1004 0 L Crescent 2 North Administration Pipework Layout Ground Floor 10.11.19 24.11.19 18.11.19 8 1198 B KAIG3-DWG-NA-M-0006 0 1 1
Mohanad drawings not valid
As Meeting on 270420 PD, MEP,
50 KAIG3 DD NA M HP 1005 0 L Crescent 2 North Administration Pipework Layout First Floor 10.11.19 24.11.19 18.11.19 8 1198 B KAIG3-DWG-NA-M-0006 0 1 1
Mohanad drawings not valid
As Meeting on 270420 PD, MEP,
51 KAIG3 DD NA M HP 1006 0 L Crescent 2 North Administration Pipework Layout Roof Floor 10.11.19 24.11.19 18.11.19 8 1198 B KAIG3-DWG-NA-M-0006 0 1 1
Mohanad drawings not valid
As Meeting on 270420 PD, MEP,
52 KAIG3 DD NA M HP 8010 0 L Crescent 2 North Administration Pipework Schematic 10.11.19 24.11.19 18.11.19 8 1198 B KAIG3-DWG-NA-M-0006 0 1 1
Mohanad drawings not valid
As Meeting on 270420 PD, MEP,
53 KAIG3 DD NA M HV 1002 0 L Crescent 2 North Administration Ventilation Layout First Floor 10.11.19 24.11.19 18.11.19 8 1198 B KAIG3-DWG-NA-M-0006 0 1 1
Mohanad drawings not valid
As Meeting on 270420 PD, MEP,
54 KAIG3 DD NA M HV 1003 0 L Crescent 2 North Administration Ventilation Layout Roof Floor 10.11.19 24.11.19 18.11.19 8 1198 B KAIG3-DWG-NA-M-0006 0 1 1
Mohanad drawings not valid
As Meeting on 270420 PD, MEP,
55 KAIG3 DD NA M HV 2007 0 L Crescent 2 North Administration Ventilation Sections 10.11.19 24.11.19 18.11.19 8 1198 B KAIG3-DWG-NA-M-0006 0 1 1
Mohanad drawings not valid
As Meeting on 270420 PD, MEP,
56 KAIG3 DD NA M HV 8008 0 L Crescent 2 North Administration Ventilation Schematic Sheet 1 of 2 10.11.19 24.11.19 18.11.19 8 1198 B KAIG3-DWG-NA-M-0006 0 1 1
Mohanad drawings not valid
As Meeting on 270420 PD, MEP,
57 KAIG3 DD NA M HV 8009 0 L Crescent 2 North Administration Ventilation Schematic Sheet 2 of 2 10.11.19 24.11.19 18.11.19 8 1198 B KAIG3-DWG-NA-M-0006 0 1 1
Mohanad drawings not valid
As Meeting on 270420 PD, MEP,
58 KAIG3 DD NA M HV 8011 0 L Crescent 2 North Administration Schedule of Equipment Sheet 1 of 2 10.11.19 24.11.19 18.11.19 8 1198 C KAIG3-DWG-NA-M-0006 0 1 1
Mohanad drawings not valid
As Meeting on 270420 PD, MEP,
59 KAIG3 DD NA M HV 8012 0 L Crescent 2 North Administration Schedule of Equipment Sheet 2 of 2 10.11.19 24.11.19 18.11.19 8 1198 C KAIG3-DWG-NA-M-0006 0 1 1
Mohanad drawings not valid
As Meeting on 270420 PD, MEP,
60 KAIG3 DD GN M 00 8001 0 L Legends & Symbol Sheet 10.11.19 24.11.19 12.11.19 2 1204 B KAIG3-DWG-NA-M-0007 0 1 1
Mohanad drawings not valid
As Meeting on 270420 PD, MEP,
61 KAIG3 DD TB M HV 1001 0 L Site Ticket Facility Booth Ventilation Layout Ground & Roof Floors 11.11.19 25.11.19 18.11.19 7 1198 B KAIG3-DWG-TB-M-0009 0 1 1
Mohanad drawings not valid
As Meeting on 270420 PD, MEP,
62 KAIG3 DD VG M DP 1001 0 L Crescent 2 Devonian Garden Water Feature Pipework Service Layout 11.11.19 25.11.19 18.11.19 7 1198 C KAIG3-DWG-VG-M-0011 0 1 1
Mohanad drawings not valid
As Meeting on 270420 PD, MEP,
63 KAIG3 DD VG M DP 1002 0 L Crescent 2 Devonian Garden Chilled Water PipeworkLayout Ground Floor 11.11.19 25.11.19 18.11.19 7 1198 C KAIG3-DWG-VG-M-0011 0 1 1
Mohanad drawings not valid
As Meeting on 270420 PD, MEP,
64 KAIG3 DD VG M HV 1001 0 L Crescent 2 Devonian Garden Ventilation Layout Ground Floor 11.11.19 25.11.19 18.11.19 7 1198 C KAIG3-DWG-VG-M-0011 0 1 1
Mohanad drawings not valid
As Meeting on 270420 PD, MEP,
65 KAIG3 DD VG M HV 1003 0 L Crescent 2 Devonian Garden AHU Enclosure Layout Ground Floor 11.11.19 25.11.19 18.11.19 7 1198 C KAIG3-DWG-VG-M-0011 0 1 1
Mohanad drawings not valid
As Meeting on 270420 PD, MEP,
66 KAIG3 DD VG M HV 1004 0 L Crescent 2 Devonian Garden Misting Pipework Layout Ground Floor 11.11.19 25.11.19 18.11.19 7 1198 C KAIG3-DWG-VG-M-0011 0 1 1
Mohanad drawings not valid
As Meeting on 270420 PD, MEP,
67 KAIG3 DD VG M HV 7005 0 L Crescent 2 Devonian Garden MEP Plant Details 11.11.19 25.11.19 18.11.19 7 1198 C KAIG3-DWG-VG-M-0011 0 1 1
Mohanad drawings not valid
As Meeting on 270420 PD, MEP,
68 KAIG3 DD VG M HV 8006 0 L Crescent 2 Devonian Garden LTHW Schematics 11.11.19 25.11.19 18.11.19 7 1198 C KAIG3-DWG-VG-M-0011 0 1 1
Mohanad drawings not valid
As Meeting on 270420 PD, MEP,
69 KAIG3 DD VG M HV 8007 0 L Crescent 2 Devonian Garden CHW Schematics 11.11.19 25.11.19 18.11.19 7 1198 C KAIG3-DWG-VG-M-0011 0 1 1
Mohanad drawings not valid
As Meeting on 270420 PD, MEP,
70 KAIG3 DD VG M HV 8008 0 L Crescent 2 Devonian Garden Ventilation Schematics 11.11.19 25.11.19 18.11.19 7 1198 C KAIG3-DWG-VG-M-0011 0 1 1
Mohanad drawings not valid
As Meeting on 270420 PD, MEP,
71 KAIG3 DD VG M HV 8009 0 L Crescent 2 Devonian Garden Schedule of Equipment Sheet 1 of 2 11.11.19 25.11.19 18.11.19 7 1198 C KAIG3-DWG-VG-M-0011 0 1 1
Mohanad drawings not valid
As Meeting on 270420 PD, MEP,
72 KAIG3 DD VG M HV 8010 0 L Crescent 2 Devonian Garden Schedule of Equipment Sheet 2 of 2 11.11.19 25.11.19 18.11.19 7 1198 C KAIG3-DWG-VG-M-0011 0 1 1
Mohanad drawings not valid
Crescent Overall Promenade & Canopies Toilet Ventilation Layout Ground As Meeting on 270420 PD, MEP,
73 KAIG3 DD PC M HV 1001 0 L 12.11.19 26.11.19 18.11.19 6 1198 B KAIG3-DWG-PC-M-0012 0 1 1
Floor Mohanad drawings not valid
As Meeting on 270420 PD, MEP,
74 KAIG3 DD PC M HV 1002 0 L Crescent Overall Promenade & Canopies Toilet Ventilation Layout Sections 12.11.19 26.11.19 18.11.19 6 1198 B KAIG3-DWG-PC-M-0012 0 1 1
Mohanad drawings not valid
As Meeting on 270420 PD, MEP,
75 KAIG3 DD PC M HV 8003 0 L Crescent OA Promenade & Canopies Schedule of Equipment 12.11.19 26.11.19 18.11.19 6 1198 B KAIG3-DWG-PC-M-0012 0 1 1
Mohanad drawings not valid
As Meeting on 270420 PD, MEP,
76 KAIG3 DD SG M HV 1001 0 L Site Sound & Kight Garden Ventilation Layout Ground Floor 13.11.19 27.11.19 18.11.19 5 1198 C KAIG3-DWG-SG-M-0013 0 1 1
Mohanad drawings not valid
As Meeting on 270420 PD, MEP,
77 KAIG3 DD FC M HV 1001 0 L Site Security & Fire Alarma Control Ventilation Layout Ground & Roof Floors 17.11.19 01.12.19 20.11.19 3 1196 C KAIG3-DWG-FC-M-0014 0 1 1
Mohanad drawings not valid
As Meeting on 270420 PD, MEP,
78 KAIG3 DD FC M HV 8002 0 L Site Security & Fire Alarm Control Ventilation Schematics 17.11.19 01.12.19 20.11.19 3 1196 C KAIG3-DWG-FC-M-0014 0 1 1
Mohanad drawings not valid
As Meeting on 270420 PD, MEP,
79 KAIG3 DD FC M HV 8003 0 L Site Security & Fire Alaram Control Schedule of Equipment 17.11.19 01.12.19 20.11.19 3 1196 C KAIG3-DWG-FC-M-0014 0 1 1
Mohanad drawings not valid
As Meeting on 270420 PD, MEP,
80 KAIG3 DD TG M HP 1002 0 L Site Butterfly Garden Pipework Layout Ground Floor 17.11.19 01.12.19 20.11.19 3 1196 C KAIG3-DWG-TG-M-0015 0 1 1
Mohanad drawings not valid
As Meeting on 270420 PD, MEP,
81 KAIG3 DD TG M HP 1003 0 L Site Butterfly Garden Misting Plant & Pipework Layout Ground Floor 17.11.19 01.12.19 20.11.19 3 1196 C KAIG3-DWG-TG-M-0015 0 1 1
Mohanad drawings not valid
As Meeting on 270420 PD, MEP,
82 KAIG3 DD TG M HP 8006 0 L Site Butterfly Garden CHW Schematics 17.11.19 01.12.19 20.11.19 3 1196 C KAIG3-DWG-TG-M-0015 0 1 1
Mohanad drawings not valid
As Meeting on 270420 PD, MEP,
83 KAIG3 DD TG M HP 8007 0 L Site Butterfly Garden LTHW Schematics 17.11.19 01.12.19 20.11.19 3 1196 C KAIG3-DWG-TG-M-0015 0 1 1
Mohanad drawings not valid
As Meeting on 270420 PD, MEP,
84 KAIG3 DD TG M HV 1001 0 L Site Butterfly Garden Ventilation Layout Ground Floor 17.11.19 01.12.19 20.11.19 3 1196 C KAIG3-DWG-TG-M-0015 0 1 1
Mohanad drawings not valid
As Meeting on 270420 PD, MEP,
85 KAIG3 DD TG M HV 800 0 L Site Butterfly Garden Ventilation Schematics 17.11.19 01.12.19 20.11.19 3 1196 C KAIG3-DWG-TG-M-0015 0 1 1
Mohanad drawings not valid
As Meeting on 270420 PD, MEP,
86 KAIG3 DD TG M HV 2004 0 L Site Butterfly Garden Mechanical Sections 17.11.19 01.12.19 20.11.19 3 1196 C KAIG3-DWG-TG-M-0015 0 1 1
Mohanad drawings not valid
As Meeting on 270420 PD, MEP,
87 KAIG3 DD TG M HV 8008 0 L Site Butterfly Garden Schedule of Equipment Sheet 1 of 2 17.11.19 01.12.19 20.11.19 3 1196 C KAIG3-DWG-TG-M-0015 0 1 1
Mohanad drawings not valid
As Meeting on 270420 PD, MEP,
88 KAIG3 DD TG M HV 8009 0 L Site Butterfly Garden Schedule of Equipment Sheet 2 of 2 17.11.19 01.12.19 20.11.19 3 1196 C KAIG3-DWG-TG-M-0015 0 1 1
Mohanad drawings not valid
Crescent 2 Carboniferous Garden Chilled Water Pipework Layout Ground As Meeting on 270420 PD, MEP,
89 KAIG3 DD NG M HP 1003 0 L 20.11.19 04.12.19 24.11.19 4 1192 C KAIG3-DWG-NG-M-0016 0 1 1
Floor Mohanad drawings not valid
As Meeting on 270420 PD, MEP,
90 KAIG3 DD NG M HP 1004 0 L Crescent 2 Carboniferous Garden Misting Pipework Layout Ground Floor 20.11.19 04.12.19 24.11.19 4 1192 C KAIG3-DWG-NG-M-0016 0 1 1
Mohanad drawings not valid
As Meeting on 270420 PD, MEP,
91 KAIG3 DD NG M HP 8005 0 L Crescent 2 Carboniferous Garden LTHW Schematics 20.11.19 04.12.19 24.11.19 4 1192 C KAIG3-DWG-NG-M-0016 0 1 1
Mohanad drawings not valid
As Meeting on 270420 PD, MEP,
92 KAIG3 DD NG M HP 8006 0 L Crescent 2 Carboniferous Garden CHW Schematics 20.11.19 04.12.19 24.11.19 4 1192 C KAIG3-DWG-NG-M-0016 0 1 1
Mohanad drawings not valid
As Meeting on 270420 PD, MEP,
93 KAIG3 DD NG M HV 1001 0 L Crescent 2 Carboniferous Garden Ventilation Layout Ground Floor 20.11.19 04.12.19 24.11.19 4 1192 C KAIG3-DWG-NG-M-0016 0 1 1
Mohanad drawings not valid
As Meeting on 270420 PD, MEP,
94 KAIG3 DD NG M HV 1002 0 L Crescent 2 Carboniferous Garden AHU Enclosure Layout Ground Floor 20.11.19 04.12.19 24.11.19 4 1192 C KAIG3-DWG-NG-M-0016 0 1 1
Mohanad drawings not valid
As Meeting on 270420 PD, MEP,
95 KAIG3 DD NG M HV 8007 0 L Crescent 2 Carboniferous Garden Ventilation Schematics 20.11.19 04.12.19 24.11.19 4 1192 C KAIG3-DWG-NG-M-0016 0 1 1
Mohanad drawings not valid

Page 71 of 111 M.Sarfraz


481

146

178
Consultant : DAR

59

98
0

0
Cancelled/ Total
Open Code A Code B Code C Code D N/A Supersede submitt
d ed Main Contractor : ZHBG

Shop Drawing Submitted

Superseded / Cancelled
0 0 146 178 0 98 59 481 DESIGN DRAWING SUBMITTAL REGISTER Sub Contractor :
Discipline : Mechanical

For Information
MECHANICAL

Under Review
Rundate: 28-Feb-2023

Code N/A
Drawing Number Number of A B C D

Code A

Code B

Code C

Code D
Approval Average Days Number of
Sl No. Rev. Latest Rev. Description Submitted Date Received Date Days with Submittal Reference Number Rev. Remarks
Required By Outstanding Days Held As Meeting on 270420 PD, MEP,
96 KAIG3 DD NG M HV 8008 0 L Crescent 2 Carboniferous Garden Schedule of Equipment Sheet 1 of 2 20.11.19 04.12.19 24.11.19 4 ZHBG
1192 C KAIG3-DWG-NG-M-0016 0 1 1
Mohanad drawings not valid
As Meeting on 270420 PD, MEP,
97 KAIG3 DD NG M HV 8009 0 L Crescent 2 Carboniferous Garden Schedule of Equipment Sheet 2 of 2 20.11.19 04.12.19 24.11.19 4 1192 C KAIG3-DWG-NG-M-0016 0 1 1
Mohanad drawings not valid
As Meeting on 270420 PD, MEP,
98 KAIG3 DD TB M HV 1007 0 L Ticket Facility Booth typical Mechanicl Layoug Ground & Roof Floors 23.12.19 06.01.20 24.12.19 1 1162 B KAIG3-DWG-TB-M-0017 0 1 1
Mohanad drawings not valid

99 KAIG3 DD GN M SU 1001 0 Site Non-Potable Water  Distribution Route- Overall 15.04.20 29.04.20 29.04.20 14 1035 C KAIG3-DD-GN-M-0019-00 0 Through PSW Only 1 1

100 KAIG3 DD GN M SU 1001 1 L Site Non-Potable Water  Distribution Route- Overall 05.05.20 19.05.20 16.05.20 11 1018 B KAIG3-DD-GN-M-0019-01 1 1 1

101 KAIG3 DD GN M SU 1020 0 Site RO Water Distribution Route - Overall 15.04.20 29.04.20 29.04.20 14 1035 C KAIG3-DD-GN-M-0020-00 0 Through PSW Only 1 1

102 KAIG3 DD GN M SU 1020 1 Site Raw Water Distribution Route - Overall 05.05.20 19.05.20 16.05.20 11 1018 B KAIG3-DD-GN-M-0020-01 1 1 1

103 KAIG3 DD GN M SU 1020 2 L Site Raw Water Distribution Route - Overall 31.07.21 14.08.21 03.08.21 3 574 B KAIG3-DD-GN-M-0020-02 2 1 1

As Mr. Ibrahim email on 160820


104 KAIG3 DD WG M DP 1001 0 L SITE WATER GARDENS SUB SURFACE DRAINAGE LAYOUT AREA A 30.04.20 14.05.20 07.05.20 7 1027 C KAIG3-DD-WG-M-0021-00 0 1 1
cancelled and deleted from PSW
As Mr. Ibrahim email on 160820
105 KAIG3 DD WG M DP 1002 0 L SITE WATER GARDENS SUB SURFACE DRAINAGE LAYOUT AREA B 30.04.20 14.05.20 07.05.20 7 1027 C KAIG3-DD-WG-M-0021-00 0 1 1
cancelled and deleted from PSW
As Mr. Ibrahim email on 160820
106 KAIG3 DD WG M DP 1003 0 L SITE WATER GARDENS SUB SURFACE DRAINAGE LAYOUT AREA C 30.04.20 14.05.20 07.05.20 7 1027 C KAIG3-DD-WG-M-0021-00 0 1 1
cancelled and deleted from PSW
As Mr. Ibrahim email on 160820
107 KAIG3 DD WG M DP 1004 0 L SITE WATER GARDENS SUB SURFACE DRAINAGE LAYOUT AREA D 30.04.20 14.05.20 07.05.20 7 1027 C KAIG3-DD-WG-M-0021-00 0 1 1
cancelled and deleted from PSW
As Mr. Ibrahim email on 160820
108 KAIG3 DD WG M DP 1005 0 L SITE WATER GARDENS SUB SURFACE DRAINAGE LAYOUT AREA E 30.04.20 14.05.20 07.05.20 7 1027 C KAIG3-DD-WG-M-0021-00 0 1 1
cancelled and deleted from PSW
As Mr. Ibrahim email on 160820
109 KAIG3 DD WG M DP 1006 0 L SITE WATER GARDENS SUB SURFACE DRAINAGE LAYOUT AREA F 30.04.20 14.05.20 07.05.20 7 1027 C KAIG3-DD-WG-M-0021-00 0 1 1
cancelled and deleted from PSW
As Mr. Ibrahim email on 160820
110 KAIG3 DD WG M DP 1007 0 L SITE WATER GARDENS SUB SURFACE DRAINAGE LAYOUT AREA G 30.04.20 14.05.20 07.05.20 7 1027 C KAIG3-DD-WG-M-0021-00 0 1 1
cancelled and deleted from PSW
SITE PHYSICS GARDEN SUB SURFACE DRAINAGE SERVICES With
111 KAIG3 DD PG M DP 1000 0 L 29.06.20 13.07.20 01.07.20 2 972 B KAIG3-DD-PG-M-0023 1 1 1
Calculation sheet 1 OF 3
SITE PHYSICS GARDEN SUB SURFACE DRAINAGE SERVICES With
112 KAIG3 DD PG M DP 1001 0 L 29.06.20 13.07.20 01.07.20 2 972 B KAIG3-DD-PG-M-0023 1 1 1
Calculation sheet 2 OF 3
SITE PHYSICS GARDEN SUB SURFACE DRAINAGE SERVICES With
113 KAIG3 DD PG M DP 1002 0 L 29.06.20 13.07.20 01.07.20 2 972 B KAIG3-DD-PG-M-0023 1 1 1
Calculation sheet 3 OF 3

114 KAIG3 DD PG M DP 1003 0 Site Physics Garden Sub Surface Drainage Services Layout Sheet 1 of 2 28.04.20 12.05.20 05.05.20 7 1029 C KAIG3-DD-PG-M-0023 0 1 1

115 KAIG3 DD PG M DP 1003 1 L Site Physics Garden Sub Surface Drainage Services Layout Sheet 1 of 2 29.06.20 13.07.20 01.07.20 2 972 B KAIG3-DD-PG-M-0023 1 1 1

116 KAIG3 DD PG M DP 1004 0 Site Physics Garden Sub Surface Drainage Services Layout Sheet 2 of 2 28.04.20 12.05.20 05.05.20 7 1029 C KAIG3-DD-PG-M-0023 0 1 1

117 KAIG3 DD PG M DP 1004 1 L Site Physics Garden Sub Surface Drainage Services Layout Sheet 2 of 2 29.06.20 13.07.20 01.07.20 2 972 B KAIG3-DD-PG-M-0023 1 1 1

118 KAIG3 DD ZG M DP 1002 0 Site Maze Garden Sub Surface Drainage Servie Layout 30.04.20 14.05.20 06.05.20 6 1028 C KAIG3-DD-ZG-M-0024 0 1 1

119 KAIG3 DD ZG M DP 1002 1 Site Maze Garden Sub Surface Drainage Servie Layout 30.05.20 13.06.20 03.06.20 4 1000 C KAIG3-DD-ZG-M-0024 1 1 1

120 KAIG3 DD ZG M DP 1002 2 L Site Maze Garden Sub Surface Drainage Servie Layout 29.06.20 13.07.20 01.07.20 2 972 B KAIG3-DD-ZG-M-0024 2 1 1

121 KAIG3 DD ZG M DP 1001 0 Site Maze Garden Sub Surface Drainage Servie Layout with Calculation 30.05.20 13.06.20 03.06.20 4 1000 C KAIG3-DD-ZG-M-0024 1 1 1

122 KAIG3 DD ZG M DP 1001 1 L Site Maze Garden Sub Surface Drainage Servie Layout with Calculation 29.06.20 13.07.20 01.07.20 2 972 B KAIG3-DD-ZG-M-0024 2 1 1

As Mr. Ibrahim email on 160820


123 KAIG3 DD TG M DP 1002 0 L Site Butterlfy Garden Sub Surface Drainage Service Layout 05.07.20 19.07.20 09.07.20 4 964 C KAIG3-DD-TG-M-0026 0 1 1
cancelled and deleted from PSW
As Mr. Ibrahim email on 160820
124 KAIG3 DD TG M DP 1003 0 L Site Butterlfy Garden Sub Surface Drainage Servics with Calculation 05.07.20 19.07.20 09.07.20 4 964 C KAIG3-DD-TG-M-0026 0 1 1
cancelled and deleted from PSW

125 KAIG3 DD LP M SP 1001 0 L LPG Overall Tank Area Layout 20.07.20 03.08.20 21.07.20 1 952 C KAIG3-DD-LP-M-0028 0 1 1

126 KAIG3 DD LP M SP 1002 0 L LPG 01 Management Maintenance Tank Area Layout 20.07.20 03.08.20 21.07.20 1 952 C KAIG3-DD-LP-M-0028 0 1 1

127 KAIG3 DD LP M SP 1003 0 L LPG 02 Aviary Tank Area Layout 20.07.20 03.08.20 21.07.20 1 952 C KAIG3-DD-LP-M-0028 0 1 1

128 KAIG3 DD LP M SP 1004 0 L LPG 03 FCC Tank Area Layout 20.07.20 03.08.20 21.07.20 1 952 C KAIG3-DD-LP-M-0028 0 1 1

129 KAIG3 DD LP M SP 1005 0 L LPG 04 Energy Center & LPG 05 South Restaurant Tank Area Layout 20.07.20 03.08.20 21.07.20 1 952 C KAIG3-DD-LP-M-0028 0 Cancelled as per MEP Dept email 1 1

130 KAIG3 DD LP M SP 1006 0 L LPG 06 Cafeteria Tank Area Layout 20.07.20 03.08.20 21.07.20 1 952 C KAIG3-DD-LP-M-0028 0 Cancelled as per MEP Dept email 1 1

131 KAIG3 DD LP M SP 1007 0 L LPG 07 North Restaurant Tank Area Layout 20.07.20 03.08.20 21.07.20 1 952 C KAIG3-DD-LP-M-0028 0 Cancelled as per MEP Dept email 1 1

132 KAIG3 DD LP M SP 1008 0 L LPG 08 North Admin Tank Area Layout 20.07.20 03.08.20 21.07.20 1 952 C KAIG3-DD-LP-M-0028 0 Cancelled as per MEP Dept email 1 1

133 KAIG3 DD RG M DP 1001 0 L Crescent 2 Cretacous Sub Surface Drainage Layout 04.08.20 18.08.20 08.08.20 4 934 B KAIG3-DD-RG-M-0029 0 1 1

134 KAIG3 DD GO M DP 1001 0 Crescent 2 Garden of Origin (Carboniferous) Sub-Surface Drainage Layout 18.08.20 01.09.20 25.08.20 7 917 C KAIG3-DD-GO-M-0030 0 1 1

135 KAIG3 DD GO M DP 1001 1 L Crescent 2 Garden of Origin (Carboniferous) Sub-Surface Drainage Layout 23.06.21 07.07.21 04.07.21 11 604 C KAIG3-DD-GO-M-0030 1 Cancelled as per MEP Dept email 1 1

136 KAIG3 DD JG M DP 1001 0 Crescent 2 Jurasic Garden Sub-Surface Drainage Layout 18.08.20 01.09.20 25.08.20 7 917 C KAIG3-DD-JG-M-0031 0 1 1

137 KAIG3 DD JG M DP 1001 1 L Crescent 2 Jurasic Garden Sub-Surface Drainage Layout 23.06.21 07.07.21 04.07.21 11 604 C KAIG3-DD-JG-M-0031 1 Cancelled as per MEP Dept email 1 1

138 KAIG3 DD CG M DP 1001 0 Crescent 1 Cenozoioc Garden Sub-Surface Drainage Layout 18.08.20 01.09.20 25.08.20 7 917 C KAIG3-DD-CG-M-0032 0 1 1

139 KAIG3 DD CG M DP 1001 1 L Crescent 1 Cenozoioc Garden Sub-Surface Drainage Layout 23.06.21 07.07.21 04.07.21 11 604 C KAIG3-DD-CG-M-0032 1 Cancelled as per MEP Dept email 1 1

CRESCENT 1 NORTH RESTAURANT DRAINAGE LAYOUT GROUND


140 KAIG3 DD NR M DP 1001 0 L 08.02.21 22.02.21 16.02.21 8 742 B KAIG3-DD-NR-M-0033 0 1 1
FLOOR
CRESCENT 1 NORTH RESTAURANT DRAINAGE LAYOUT FIRST
141 KAIG3 DD NR M DP 1002 0 L 08.02.21 22.02.21 16.02.21 8 742 B KAIG3-DD-NR-M-0033 0 1 1
FLOOR
CRESCENT 1 NORTH RESTAURANT DRAINAGE LAYOUT ROOF
142 KAIG3 DD NR M DP 1003 0 L 08.02.21 22.02.21 16.02.21 8 742 B KAIG3-DD-NR-M-0033 0 1 1
FLOOR
CRESCENT 1 NORTH RESTAURANT FIRE FIGHTING LAYOUT
143 KAIG3 DD NR M FF 1001 0 L 08.02.21 22.02.21 16.02.21 8 742 B KAIG3-DD-NR-M-0033 0 1 1
GROUND FLOOR

Page 72 of 111 M.Sarfraz


481

146

178
Consultant : DAR

59

98
0

0
Cancelled/ Total
Open Code A Code B Code C Code D N/A Supersede submitt
d ed Main Contractor : ZHBG

Shop Drawing Submitted

Superseded / Cancelled
0 0 146 178 0 98 59 481 DESIGN DRAWING SUBMITTAL REGISTER Sub Contractor :
Discipline : Mechanical

For Information
MECHANICAL

Under Review
Rundate: 28-Feb-2023

Code N/A
Drawing Number Number of A B C D

Code A

Code B

Code C

Code D
Approval Average Days Number of
Sl No. Rev. Latest Rev. Description Submitted Date Received Date Days with Submittal Reference Number Rev. Remarks
CRESCENT 1 NORTH RESTAURANT FIRE FIGHTING LAYOUT FIRST Required By Outstanding Days Held
144 KAIG3 DD NR M FF 1002 0 L 08.02.21 22.02.21 16.02.21 8 ZHBG
742 B KAIG3-DD-NR-M-0033 0 1 1
FLOOR
CRESCENT 1 NORTH RESTAURANT PIPEWORK LAYOUT GROUND
145 KAIG3 DD NR M HP 1003 0 L 08.02.21 22.02.21 16.02.21 8 742 B KAIG3-DD-NR-M-0033 0 1 1
FLOOR
CRESCENT 1 NORTH RESTAURANT PIPEWORK LAYOUT FIRST
146 KAIG3 DD NR M HP 1004 0 L 08.02.21 22.02.21 16.02.21 8 742 B KAIG3-DD-NR-M-0033 0 1 1
FLOOR
CRESCENT 1 NORTH RESTAURANT PIPEWORK LAYOUT ROOF
147 KAIG3 DD NR M HP 1005 0 L 08.02.21 22.02.21 16.02.21 8 742 B KAIG3-DD-NR-M-0033 0 1 1
FLOOR

148 KAIG3 DD NR M HP 6002 0 L CRESCENT 1 NORTH RESTAURANT PIPEWORK SCHEMATIC 08.02.21 22.02.21 16.02.21 8 742 B KAIG3-DD-NR-M-0033 0 1 1

CRESCENT 1 NORTH RESTAURANT VENTILATION LAYOUT WITH HAP


149 KAIG3 DD NR M HV 1003 0 L 08.02.21 22.02.21 16.02.21 8 742 B KAIG3-DD-NR-M-0033 0 1 1
CALCULATION GROUND FLOOR
CRESCENT 1 NORTH RESTAURANT VENTILATION LAYOUT FIRST
150 KAIG3 DD NR M HV 1004 0 L 08.02.21 22.02.21 16.02.21 8 742 B KAIG3-DD-NR-M-0033 0 1 1
FLOOR
CRESCENT 1 NORTH RESTAURANT VENTILATION LAYOUT ROOF
151 KAIG3 DD NR M HV 1005 0 L 08.02.21 22.02.21 16.02.21 8 742 B KAIG3-DD-NR-M-0033 0 1 1
FLOOR

152 KAIG3 DD NR M HV 6001 0 CRESCENT 1 NORTH RESTAURANT VENTILATION SCHEMATIC 08.02.21 22.02.21 16.02.21 8 742 C KAIG3-DD-NR-M-0033 0 1 1

153 KAIG3 DD NR M HV 6001 1 L CRESCENT 1 NORTH RESTAURANT VENTILATION SCHEMATIC 17.03.21 31.03.21 22.03.21 5 708 B KAIG3-DD-NR-M-0033 1 1 1

CRESCENT 1 NORTH RESTAURANT SCHEDULE OF EQUIPMENT


154 KAIG3 DD NR M HV 8001 0 L 08.02.21 22.02.21 16.02.21 8 742 B KAIG3-DD-NR-M-0033 0 1 1
SHEET 1 OF 1
CRESCENT 1 NORTH RESTAURANT WATER SERVICES LAYOUT
155 KAIG3 DD NR M WS 1001 0 L 08.02.21 22.02.21 16.02.21 8 742 B KAIG3-DD-NR-M-0033 0 1 1
GROUND FLOOR
CRESCENT 1 NORTH RESTAURANT WATER SERVICES LAYOUT FIRST
156 KAIG3 DD NR M WS 1002 0 L 08.02.21 22.02.21 16.02.21 8 742 B KAIG3-DD-NR-M-0033 0 1 1
FLOOR

157 KAIG3 DD CO M WS 1001 0 L Crescents Overall Potable Water & Fire System Sheet 1 OF 5 25.10.20 08.11.20 01.11.20 7 849 B KAIG3-DD-CO-M-0036 0 1 1

158 KAIG3 DD CO M WS 1002 0 L Crescents Overall Potable Water & Fire System Sheet 2 OF 5 25.10.20 08.11.20 01.11.20 7 849 B KAIG3-DD-CO-M-0036 0 1 1

159 KAIG3 DD CO M WS 1003 0 L Crescents Overall Potable Water & Fire System Sheet 3 OF 5 25.10.20 08.11.20 01.11.20 7 849 B KAIG3-DD-CO-M-0036 0 1 1

160 KAIG3 DD CO M WS 1004 0 L Crescents Overall Potable Water & Fire System Sheet 4 OF 5 25.10.20 08.11.20 01.11.20 7 849 B KAIG3-DD-CO-M-0036 0 1 1

161 KAIG3 DD CO M WS 1005 0 L Crescents Overall Potable Water & Fire System Sheet 5 OF 5 25.10.20 08.11.20 01.11.20 7 849 B KAIG3-DD-CO-M-0036 0 1 1

162 KAIG3 DD CO M WS 6001 0 L Crescents Overall Potable Water & Fire System Schematics 25.10.20 08.11.20 01.11.20 7 849 B KAIG3-DD-CO-M-0036 0 1 1

CRESCENT 1 SOUTH RESTAURANT DRAINAGE LAYOUT GROUND


163 KAIG3 DD SR M DP 1001 0 L 29.10.20 12.11.20 07.11.20 9 843 B KAIG3-DD-SR-M-0034 0 1 1
FLOOR
CRESCENT 1 SOUTH RESTAURANT DRAINAGE LAYOUT FIRST
164 KAIG3 DD SR M DP 1002 0 L 29.10.20 12.11.20 07.11.20 9 843 B KAIG3-DD-SR-M-0034 0 1 1
FLOOR
CRESCENT 1 SOUTH RESTAURANT DRAINAGE LAYOUT ROOF
165 KAIG3 DD SR M DP 1003 0 L 29.10.20 12.11.20 07.11.20 9 843 B KAIG3-DD-SR-M-0034 0 1 1
FLOOR
CRESCENT 1 SOUTH RESTAURANT FIRE FIGHTING LAYOUT
166 KAIG3 DD SR M FF 1001 0 L 29.10.20 12.11.20 07.11.20 9 843 B KAIG3-DD-SR-M-0034 0 1 1
GROUND FLOOR
CRESCENT 1 SOUTH RESTAURANT FIRE FIGHTING LAYOUT FIRST
167 KAIG3 DD SR M FF 1002 0 L 29.10.20 12.11.20 07.11.20 9 843 B KAIG3-DD-SR-M-0034 0 1 1
FLOOR
CRESCENT 1 SOUTH RESTAURANT PIPEWORK LAYOUT GROUND
168 KAIG3 DD SR M HP 1001 0 L 29.10.20 12.11.20 07.11.20 9 843 B KAIG3-DD-SR-M-0034 0 1 1
FLOOR
CRESCENT 1 SOUTH RESTAURANT PIPEWORK LAYOUT FIRST
169 KAIG3 DD SR M HP 1002 0 L 29.10.20 12.11.20 07.11.20 9 843 B KAIG3-DD-SR-M-0034 0 1 1
FLOOR
CRESCENT 1 SOUTH RESTAURANT PIPEWORK LAYOUT ROOF
170 KAIG3 DD SR M HP 1003 0 L 29.10.20 12.11.20 07.11.20 9 843 B KAIG3-DD-SR-M-0034 0 1 1
FLOOR

171 KAIG3 DD SR M HP 6002 0 L CRESCENT 1 SOUTH RESTAURANT SCHEMATIC DIAGRAM 29.10.20 12.11.20 07.11.20 9 843 B KAIG3-DD-SR-M-0034 0 1 1

CRESCENT 1 SOUTH RESTAURANT VENTILATION LAYOUT GROUND


172 KAIG3 DD SR M HV 1001 0 L 29.10.20 12.11.20 07.11.20 9 843 B KAIG3-DD-SR-M-0034 0 1 1
FLOOR (ATTACHED CALCULATION)
CRESCENT 1 SOUTH RESTAURANT VENTILATION LAYOUT FIRST
173 KAIG3 DD SR M HV 1002 0 L 29.10.20 12.11.20 07.11.20 9 843 B KAIG3-DD-SR-M-0034 0 1 1
FLOOR
CRESCENT 1 SOUTH RESTAURANT VENTILATION LAYOUT ROOF
174 KAIG3 DD SR M HV 1003 0 L 29.10.20 12.11.20 07.11.20 9 843 B KAIG3-DD-SR-M-0034 0 1 1
FLOOR
CRESCENT 1 SOUTH RESTAURANT SCHEDULE OF EQUIPMENT
175 KAIG3 DD SR M HV 8001 0 L 29.10.20 12.11.20 07.11.20 9 843 B KAIG3-DD-SR-M-0034 0 1 1
SHEET 1 OF 1
CRESCENT 1 SOUTH RESTAURANT WATER SERVICES LAYOUT
176 KAIG3 DD SR M WS 1001 0 L 29.10.20 12.11.20 07.11.20 9 843 B KAIG3-DD-SR-M-0034 0 1 1
GROUND FLOOR
CRESCENT 1 SOUTH RESTAURANT WATER SERVICES LAYOUT FIRST
177 KAIG3 DD SR M WS 1002 0 L 29.10.20 12.11.20 07.11.20 9 843 B KAIG3-DD-SR-M-0034 0 1 1
FLOOR

178 KAIG3 DD CF M DP 1001 0 L Crescent 2 Cafeteria Low Level Drainage Layout Undercroft Floor 29.10.20 12.11.20 07.11.20 9 843 B KAIG3-DD-CF-M-0035 0 1 1

179 KAIG3 DD CF M DP 1002 0 L Crescent 2 Cafeteria High Level Drainage Layout Undercroft Floor 29.10.20 12.11.20 07.11.20 9 843 B KAIG3-DD-CF-M-0035 0 1 1

180 KAIG3 DD CF M DP 1003 0 L Crescent 2 Cafeteria Drainage Layout Ground Floor 29.10.20 12.11.20 07.11.20 9 843 B KAIG3-DD-CF-M-0035 0 1 1

181 KAIG3 DD CF M DP 1004 0 L Crescent 2 Cafeteria Drainage Layout First Floor 29.10.20 12.11.20 07.11.20 9 843 B KAIG3-DD-CF-M-0035 0 1 1

182 KAIG3 DD CF M DP 1005 0 L Crescent 2 Cafeteria Drainage Layout Roof Floor 29.10.20 12.11.20 07.11.20 9 843 B KAIG3-DD-CF-M-0035 0 1 1

183 KAIG3 DD CF M FF 1001 0 L Crescent 2 Cafeteria Fire Fighting Layout Undercroft Floor 29.10.20 12.11.20 07.11.20 9 843 B KAIG3-DD-CF-M-0035 0 1 1

184 KAIG3 DD CF M FF 1002 0 L Crescent 2 Cafeteria Fire Fighting Layout Ground Floor 29.10.20 12.11.20 07.11.20 9 843 B KAIG3-DD-CF-M-0035 0 1 1

185 KAIG3 DD CF M FF 1003 0 L Crescent 2 Cafeteria Fire Fighting Layout First Floor 29.10.20 12.11.20 07.11.20 9 843 B KAIG3-DD-CF-M-0035 0 1 1

186 KAIG3 DD CF M FF 1004 0 L Crescent 2 Cafeteria Fire Fighting Layout Roof Floor 29.10.20 12.11.20 07.11.20 9 843 B KAIG3-DD-CF-M-0035 0 1 1

187 KAIG3 DD CF M HP 1001 0 L Crescent 2 Cafeteria Chilled Water Pipe Work Layout Undercroft Floor 29.10.20 12.11.20 07.11.20 9 843 B KAIG3-DD-CF-M-0035 0 1 1

188 KAIG3 DD CF M HP 1002 0 L Crescent 2 Cafeteria Chilled Water Pipe Work Layout Ground Floor 29.10.20 12.11.20 07.11.20 9 843 B KAIG3-DD-CF-M-0035 0 1 1

189 KAIG3 DD CF M HP 1003 0 L Crescent 2 Cafeteria Chilled Water Pipe Work Layout First Floor 29.10.20 12.11.20 07.11.20 9 843 B KAIG3-DD-CF-M-0035 0 1 1

190 KAIG3 DD CF M HP 1004 0 L Crescent 2 Cafeteria Chilled Water Pipe Work Layout Roof Floor 29.10.20 12.11.20 07.11.20 9 843 B KAIG3-DD-CF-M-0035 0 1 1

191 KAIG3 DD CF M HP 6002 0 L Crescent 2 Cafeteria Pipework Schematics Sheet 1 Of 1 29.10.20 12.11.20 07.11.20 9 843 B KAIG3-DD-CF-M-0035 0 1 1

Page 73 of 111 M.Sarfraz


481

146

178
Consultant : DAR

59

98
0

0
Cancelled/ Total
Open Code A Code B Code C Code D N/A Supersede submitt
d ed Main Contractor : ZHBG

Shop Drawing Submitted

Superseded / Cancelled
0 0 146 178 0 98 59 481 DESIGN DRAWING SUBMITTAL REGISTER Sub Contractor :
Discipline : Mechanical

For Information
MECHANICAL

Under Review
Rundate: 28-Feb-2023

Code N/A
Drawing Number Number of A B C D

Code A

Code B

Code C

Code D
Approval Average Days Number of
Sl No. Rev. Latest Rev. Description Submitted Date Received Date Days with Submittal Reference Number Rev. Remarks
Crescent 2 Cafeteria Ventilation Layout Undercroft Floor (Calculation Required By Outstanding Days Held
192 KAIG3 DD CF M HV 1001 0 L 29.10.20 12.11.20 07.11.20 9 ZHBG
843 B KAIG3-DD-CF-M-0035 0 1 1
Attached)

193 KAIG3 DD CF M HV 1002 0 L Crescent 2 Cafeteria Ventilation Layout Ground Floor 29.10.20 12.11.20 07.11.20 9 843 B KAIG3-DD-CF-M-0035 0 1 1

194 KAIG3 DD CF M HV 1003 0 L Crescent 2 Cafeteria Ventilation Layout First Floor 29.10.20 12.11.20 07.11.20 9 843 B KAIG3-DD-CF-M-0035 0 1 1

195 KAIG3 DD CF M HV 1004 0 L Crescent 2 Cafeteria Ventilation Layout Roof Floor 29.10.20 12.11.20 07.11.20 9 843 B KAIG3-DD-CF-M-0035 0 1 1

196 KAIG3 DD CF M HV 8001 0 L Crescent 2 Cafeteria Schedule of Equipment Sheet 1 Of 1 29.10.20 12.11.20 07.11.20 9 843 B KAIG3-DD-CF-M-0035 0 1 1

197 KAIG3 DD CF M WS 1001 0 L Crescent 2 Cafeteria Water Services Layout Undercroft Floor 29.10.20 12.11.20 07.11.20 9 843 B KAIG3-DD-CF-M-0035 0 1 1

198 KAIG3 DD CF M WS 1002 0 L Crescent 2 Cafeteria Water Services Layout Ground Floor 29.10.20 12.11.20 07.11.20 9 843 B KAIG3-DD-CF-M-0035 0 1 1

199 KAIG3 DD CF M WS 1003 0 L Crescent 2 Cafeteria Water Services Layout First Floor 29.10.20 12.11.20 07.11.20 9 843 B KAIG3-DD-CF-M-0035 0 1 1

200 KAIG3 DD GC M FF 1001 0 L GARDEN OF CHOICES FIRE FIGHTING LAYOUT GROUND FLOOR 11.11.20 25.11.20 17.11.20 6 833 B KAIG3-DD-GC-M-0037 0 1 1

GARDEN OF CHOICES CHILLED WATER LAYOUT GROUND FLOOR


201 KAIG3 DD GC M HP 1003 0 L 11.11.20 25.11.20 17.11.20 6 833 B KAIG3-DD-GC-M-0037 0 1 1
SHEET 1 OF 2
GARDEN OF CHOICES CHILLED WATER LAYOUT GROUND FLOOR
202 KAIG3 DD GC M HP 1004 0 L 11.11.20 25.11.20 17.11.20 6 833 B KAIG3-DD-GC-M-0037 0 1 1
SHEET 2 OF 2

203 KAIG3 DD GC M HP 6007 0 L GARDEN OF CHOICES CHILLED WATER SCHEMATICS 11.11.20 25.11.20 17.11.20 6 833 B KAIG3-DD-GC-M-0037 0 1 1

204 KAIG3 DD GC M HP 6008 0 L GARDEN OF CHOICES HEATING WATER SCHEMATICS 11.11.20 25.11.20 17.11.20 6 833 B KAIG3-DD-GC-M-0037 0 1 1

GARDEN OF CHOICES VENTILATION LAYOUT GROUND FLOOR


205 KAIG3 DD GC M HV 1001 0 L 11.11.20 25.11.20 17.11.20 6 833 B KAIG3-DD-GC-M-0037 0 1 1
SHEET 1 OF 2
GARDEN OF CHOICES VENTILATION LAYOUT GROUND FLOOR
206 KAIG3 DD GC M HV 1002 0 L 11.11.20 25.11.20 17.11.20 6 833 B KAIG3-DD-GC-M-0037 0 1 1
SHEET 2 OF 2

207 KAIG3 DD GC M HV 6006 0 L GARDEN OF CHOICES VENTILATION SCHEMATIC 11.11.20 25.11.20 17.11.20 6 833 B KAIG3-DD-GC-M-0037 0 1 1

208 KAIG3 DD GC M HV 2005 0 L GARDEN OF CHOICES PODS PLAN AND SECTION 11.11.20 25.11.20 17.11.20 6 833 B KAIG3-DD-GC-M-0037 0 1 1

209 KAIG3 DD GC M HV 8009 0 L GARDEN OF CHOICES SCHEDULE EQUIPMENTS 11.11.20 25.11.20 17.11.20 6 833 B KAIG3-DD-GC-M-0037 0 1 1

GARDEN OF CHOICES WATER MISTING LAYOUT GROUND FLOOR


210 KAIG3 DD GC M WS 1001 0 L 11.11.20 25.11.20 17.11.20 6 833 B KAIG3-DD-GC-M-0037 0 1 1
SHEET 1 OF 2
GARDEN OF CHOICES WATER MISTING LAYOUT GROUND FLOOR
211 KAIG3 DD GC M WS 1002 0 L 11.11.20 25.11.20 17.11.20 6 833 B KAIG3-DD-GC-M-0037 0 1 1
SHEET 2 OF 2

212 KAIG3 DD LG M FF 1001 0 L PLIOCENE GARDEN FIRE FIGHTING LAYOUT GROUND FLOOR 11.11.20 25.11.20 17.11.20 6 833 B KAIG3-DD-LG-M-0038 0 1 1

PLIOCENE GARDEN CHILLED WATER LAYOUT GROUND FLOOR


213 KAIG3 DD LG M HP 1004 0 L 11.11.20 25.11.20 17.11.20 6 833 B KAIG3-DD-LG-M-0038 0 1 1
SHEET 1 OF 3
PLIOCENE GARDEN CHILLED WATER LAYOUT GROUND FLOOR
214 KAIG3 DD LG M HP 1005 0 L 11.11.20 25.11.20 17.11.20 6 833 B KAIG3-DD-LG-M-0038 0 1 1
SHEET 2 OF 3
PLIOCENE GARDEN CHILLED WATER LAYOUT GROUND FLOOR
215 KAIG3 DD LG M HP 1006 0 L 11.11.20 25.11.20 17.11.20 6 833 B KAIG3-DD-LG-M-0038 0 1 1
SHEET 3 OF 3

216 KAIG3 DD LG M HP 6008 0 L PLIOCENE GARDEN CHILLED WATER SCHEMATICS 11.11.20 25.11.20 17.11.20 6 833 B KAIG3-DD-LG-M-0038 0 1 1

217 KAIG3 DD LG M HP 6009 0 L PLIOCENE GARDEN HEATING WATER SCHEMATICS 11.11.20 25.11.20 17.11.20 6 833 B KAIG3-DD-LG-M-0038 0 1 1

PLIOCENE GARDEN VENTILATION LAYOUT GROUND FLOOR SHEET 1


218 KAIG3 DD LG M HV 1001 0 L 11.11.20 25.11.20 17.11.20 6 833 B KAIG3-DD-LG-M-0038 0 1 1
OF 3
PLIOCENE GARDEN VENTILATION LAYOUT GROUND FLOOR SHEET 2
219 KAIG3 DD LG M HV 1002 0 L 11.11.20 25.11.20 17.11.20 6 833 B KAIG3-DD-LG-M-0038 0 1 1
OF 3
PLIOCENE GARDEN VENTILATION LAYOUT GROUND FLOOR SHEET 3
220 KAIG3 DD LG M HV 1003 0 L 11.11.20 25.11.20 17.11.20 6 833 B KAIG3-DD-LG-M-0038 0 1 1
OF 3

221 KAIG3 DD LG M HV 6007 0 L PLIOCENE GARDEN VENTILATION SCHEMATICS 11.11.20 25.11.20 17.11.20 6 833 B KAIG3-DD-LG-M-0038 0 1 1

222 KAIG3 DD LG M HV 8010 0 L PLIOCENE GARDEN SCHEDULE OF EQUIPMENTS 11.11.20 25.11.20 17.11.20 6 833 B KAIG3-DD-LG-M-0038 0 1 1

PLIOCENE GARDEN WATER MISTING LAYOUT GROUND FLOOR


223 KAIG3 DD LG M WS 1001 0 L 11.11.20 25.11.20 17.11.20 6 833 B KAIG3-DD-LG-M-0038 0 1 1
SHEET 1 OF 3
PLIOCENE GARDEN WATER MISTING LAYOUT GROUND FLOOR
224 KAIG3 DD LG M WS 1002 0 L 11.11.20 25.11.20 17.11.20 6 833 B KAIG3-DD-LG-M-0038 0 1 1
SHEET 2 OF 3
PLIOCENE GARDEN WATER MISTING LAYOUT GROUND FLOOR
225 KAIG3 DD LG M WS 1003 0 L 11.11.20 25.11.20 17.11.20 6 833 B KAIG3-DD-LG-M-0038 0 1 1
SHEET 3 OF 3

226 KAIG3 DD EC M DP 1001 0 Site Energy Center 2 Drainage Layout Ground Floor Sheet 1 of 6 16.12.20 30.12.20 30.12.20 14 790 C KAIG3-DD-EC-M-0039 0 1 1

227 KAIG3 DD EC M DP 1001 1 Site Energy Center 2 Drainage Layout Ground Floor Sheet 1 of 6 07.11.21 21.11.21 11.12.21 34 444 C KAIG3-DD-EC-M-0039 1 1 1

Superseded with Submittal # KAIG3-


KAIG3 DD EC M DP 1001 2 L Site Energy Center 2 Drainage Layout Ground Floor Sheet 1 of 6 07.03.22 21.03.22 19.03.22 12 346 C KAIG3-DD-EC-M-0039 3 1 1
DD-EC-M-0053-00

228 KAIG3 DD EC M DP 1002 0 Site Energy Center 2 Drainage Layout Ground Floor Sheet 2 of 6 16.12.20 30.12.20 30.12.20 14 790 C KAIG3-DD-EC-M-0039 0 1 1

229 KAIG3 DD EC M DP 1002 1 Site Energy Center 2 Drainage Layout Ground Floor Sheet 2 of 6 07.11.21 21.11.21 11.12.21 34 444 C KAIG3-DD-EC-M-0039 1 1 1

Superseded with Submittal # KAIG3-


KAIG3 DD EC M DP 1002 2 L Site Energy Center 2 Drainage Layout Ground Floor Sheet 2 of 6 07.03.22 21.03.22 19.03.22 12 346 C KAIG3-DD-EC-M-0039 3 1 1
DD-EC-M-0053-00

230 KAIG3 DD EC M DP 1003 0 Site Energy Center 2 Drainage Layout Ground Floor Sheet 3 of 6 16.12.20 30.12.20 30.12.20 14 790 C KAIG3-DD-EC-M-0039 0 1 1

231 KAIG3 DD EC M DP 1003 1 Site Energy Center 2 Drainage Layout Ground Floor Sheet 3 of 6 07.11.21 21.11.21 11.12.21 34 444 C KAIG3-DD-EC-M-0039 1 1 1

Superseded with Submittal # KAIG3-


KAIG3 DD EC M DP 1003 2 L Site Energy Center 2 Drainage Layout Ground Floor Sheet 3 of 6 07.03.22 21.03.22 19.03.22 12 346 C KAIG3-DD-EC-M-0039 3 1 1
DD-EC-M-0053-00

232 KAIG3 DD EC M DP 1004 0 Site Energy Center 2 Drainage Layout Ground Floor Sheet 4 of 6 16.12.20 30.12.20 30.12.20 14 790 C KAIG3-DD-EC-M-0039 0 1 1

233 KAIG3 DD EC M DP 1004 1 Site Energy Center 2 Drainage Layout Ground Floor Sheet 4 of 6 07.11.21 21.11.21 11.12.21 34 444 C KAIG3-DD-EC-M-0039 1 1 1

Superseded with Submittal # KAIG3-


KAIG3 DD EC M DP 1004 2 L Site Energy Center 2 Drainage Layout Ground Floor Sheet 4 of 6 07.03.22 21.03.22 19.03.22 12 346 C KAIG3-DD-EC-M-0039 3 1 1
DD-EC-M-0053-00

234 KAIG3 DD EC M DP 1005 0 Site Energy Center 2 Drainage Layout Ground Floor Sheet 5 of 6 16.12.20 30.12.20 30.12.20 14 790 C KAIG3-DD-EC-M-0039 0 1 1

235 KAIG3 DD EC M DP 1005 1 Site Energy Center 2 Drainage Layout Ground Floor Sheet 5 of 6 07.11.21 21.11.21 11.12.21 34 444 C KAIG3-DD-EC-M-0039 1 1 1

Page 74 of 111 M.Sarfraz


481

146

178
Consultant : DAR

59

98
0

0
Cancelled/ Total
Open Code A Code B Code C Code D N/A Supersede submitt
d ed Main Contractor : ZHBG

Shop Drawing Submitted

Superseded / Cancelled
0 0 146 178 0 98 59 481 DESIGN DRAWING SUBMITTAL REGISTER Sub Contractor :
Discipline : Mechanical

For Information
MECHANICAL

Under Review
Rundate: 28-Feb-2023

Code N/A
Drawing Number Number of A B C D

Code A

Code B

Code C

Code D
Approval Average Days Number of
Sl No. Rev. Latest Rev. Description Submitted Date Received Date Days with Submittal Reference Number Rev. Remarks
Required By Outstanding Days Held Superseded with Submittal # KAIG3-
KAIG3 DD EC M DP 1005 2 L Site Energy Center 2 Drainage Layout Ground Floor Sheet 5 of 6 07.03.22 21.03.22 19.03.22 12 ZHBG
346 C KAIG3-DD-EC-M-0039 3 1 1
DD-EC-M-0053-00

236 KAIG3 DD EC M DP 1006 0 Site Energy Center 2 Drainage Layout Ground Floor Sheet 6 of 6 16.12.20 30.12.20 30.12.20 14 790 C KAIG3-DD-EC-M-0039 0 1 1

237 KAIG3 DD EC M DP 1006 1 Site Energy Center 2 Drainage Layout Ground Floor Sheet 6 of 6 07.11.21 21.11.21 11.12.21 34 444 C KAIG3-DD-EC-M-0039 1 1 1

Superseded with Submittal # KAIG3-


KAIG3 DD EC M DP 1006 2 L Site Energy Center 2 Drainage Layout Ground Floor Sheet 6 of 6 07.03.22 21.03.22 19.03.22 12 346 C KAIG3-DD-EC-M-0039 3 1 1
DD-EC-M-0053-00

238 KAIG3 DD EC M DP 1007 0 Site Energy Center 2 Drainage Layout Mezzanine Floor Sheet 1 of 3 16.12.20 30.12.20 30.12.20 14 790 C KAIG3-DD-EC-M-0039 0 1 1

239 KAIG3 DD EC M DP 1007 1 Site Energy Center 2 Drainage Layout Mezzanine Floor Sheet 1 of 3 07.11.21 21.11.21 11.12.21 34 444 C KAIG3-DD-EC-M-0039 1 1 1

Superseded with Submittal # KAIG3-


KAIG3 DD EC M DP 1007 2 L Site Energy Center 2 Drainage Layout Mezzanine Floor Sheet 1 of 3 07.03.22 21.03.22 19.03.22 12 346 C KAIG3-DD-EC-M-0039 3 1 1
DD-EC-M-0053-00

240 KAIG3 DD EC M DP 1008 0 Site Energy Center 2 Drainage Layout Mezzanine Floor Sheet 2 of 3 16.12.20 30.12.20 30.12.20 14 790 C KAIG3-DD-EC-M-0039 0 1 1

241 KAIG3 DD EC M DP 1008 1 Site Energy Center 2 Drainage Layout Mezzanine Floor Sheet 2 of 3 07.11.21 21.11.21 11.12.21 34 444 C KAIG3-DD-EC-M-0039 1 1 1

Superseded with Submittal # KAIG3-


KAIG3 DD EC M DP 1008 2 L Site Energy Center 2 Drainage Layout Mezzanine Floor Sheet 2 of 3 07.03.22 21.03.22 19.03.22 12 346 C KAIG3-DD-EC-M-0039 3 1 1
DD-EC-M-0053-00

242 KAIG3 DD EC M DP 1009 0 Site Energy Center 2 Drainage Layout Mezzanine Floor Sheet 3 of 3 16.12.20 30.12.20 30.12.20 14 790 C KAIG3-DD-EC-M-0039 0 1 1

243 KAIG3 DD EC M DP 1009 1 Site Energy Center 2 Drainage Layout Mezzanine Floor Sheet 3 of 3 07.11.21 21.11.21 11.12.21 34 444 C KAIG3-DD-EC-M-0039 1 1 1

Superseded with Submittal # KAIG3-


KAIG3 DD EC M DP 1009 2 L Site Energy Center 2 Drainage Layout Mezzanine Floor Sheet 3 of 3 07.03.22 21.03.22 19.03.22 12 346 C KAIG3-DD-EC-M-0039 3 1 1
DD-EC-M-0053-00

244 KAIG3 DD EC M DP 1010 0 Site Energy Center 2 Drainage Layout Roof Floor Sheet 1 of 3 16.12.20 30.12.20 30.12.20 14 790 C KAIG3-DD-EC-M-0039 0 1 1

245 KAIG3 DD EC M DP 1010 1 Site Energy Center 2 Drainage Layout Roof Floor Sheet 1 of 3 07.11.21 21.11.21 11.12.21 34 444 C KAIG3-DD-EC-M-0039 1 1 1

Superseded with Submittal # KAIG3-


KAIG3 DD EC M DP 1010 2 L Site Energy Center 2 Drainage Layout Roof Floor Sheet 1 of 3 07.03.22 21.03.22 19.03.22 12 346 C KAIG3-DD-EC-M-0039 3 1 1
DD-EC-M-0053-00

246 KAIG3 DD EC M DP 1011 0 Site Energy Center 2 Drainage Layout Roof Floor Sheet 2 of 3 16.12.20 30.12.20 30.12.20 14 790 C KAIG3-DD-EC-M-0039 0 1 1

247 KAIG3 DD EC M DP 1011 1 Site Energy Center 2 Drainage Layout Roof Floor Sheet 2 of 3 07.11.21 21.11.21 11.12.21 34 444 C KAIG3-DD-EC-M-0039 1 1 1

Superseded with Submittal # KAIG3-


KAIG3 DD EC M DP 1011 2 L Site Energy Center 2 Drainage Layout Roof Floor Sheet 2 of 3 07.03.22 21.03.22 19.03.22 12 346 C KAIG3-DD-EC-M-0039 3 1 1
DD-EC-M-0053-00

248 KAIG3 DD EC M DP 1012 0 Site Energy Center 2 Drainage Layout Roof Floor Sheet 3 of 3 16.12.20 30.12.20 30.12.20 14 790 C KAIG3-DD-EC-M-0039 0 1 1

249 KAIG3 DD EC M DP 1012 1 Site Energy Center 2 Drainage Layout Roof Floor Sheet 3 of 3 07.11.21 21.11.21 11.12.21 34 444 C KAIG3-DD-EC-M-0039 1 1 1

Superseded with Submittal # KAIG3-


KAIG3 DD EC M DP 1012 2 L Site Energy Center 2 Drainage Layout Roof Floor Sheet 3 of 3 07.03.22 21.03.22 19.03.22 12 346 C KAIG3-DD-EC-M-0039 3 1 1
DD-EC-M-0053-00

250 KAIG3 DD EC M FF 1001 0 Site Energy Center 2 Fire Fighting Ground Floor Layout Sheet 1 of 2 16.12.20 30.12.20 30.12.20 14 790 C KAIG3-DD-EC-M-0039 0 1 1

251 KAIG3 DD EC M FF 1001 1 Site Energy Center 2 Fire Fighting Ground Floor Layout Sheet 1 of 2 07.11.21 21.11.21 11.12.21 34 444 C KAIG3-DD-EC-M-0039 1 1 1
SUPERSEDE WITH DRAW # KAIG3-
KAIG3 DD EC M FF 1001 2 L Site Energy Center 2 Fire Fighting Ground Floor Layout Sheet 1 of 2 07.03.22 21.03.22 19.03.22 12 346 C KAIG3-DD-EC-M-0039 3 DD-EC-M-FF-1004 SUBMITTAL # 1 1
KAIG3-DD-EC-M-0051
252 KAIG3 DD EC M FF 1002 0 Site Energy Center 2 Fire Fighting Ground Floor Layout Sheet 2 of 2 16.12.20 30.12.20 30.12.20 14 790 C KAIG3-DD-EC-M-0039 0 1 1

253 KAIG3 DD EC M FF 1002 1 Site Energy Center 2 Fire Fighting Ground Floor Layout Sheet 2 of 2 07.11.21 21.11.21 11.12.21 34 444 C KAIG3-DD-EC-M-0039 1 1 1
SUPERSEDE WITH DRAW # KAIG3-
KAIG3 DD EC M FF 1002 2 L Site Energy Center 2 Fire Fighting Ground Floor Layout Sheet 2 of 2 07.03.22 21.03.22 19.03.22 12 346 C KAIG3-DD-EC-M-0039 3 DD-EC-M-FF-1005 SUBMITTAL # 1 1
KAIG3-DD-EC-M-0051
254 KAIG3 DD EC M FF 1003 0 Site Energy Center 2 Fire Fighting Mezzanine Floor Layout Sheet 1 of 1 07.11.21 21.11.21 11.12.21 34 444 C KAIG3-DD-EC-M-0039 1 1 1
SUPERSEDE WITH DRAW # KAIG3-
KAIG3 DD EC M FF 1003 1 L Site Energy Center 2 Fire Fighting Mezzanine Floor Layout Sheet 1 of 1 07.03.22 21.03.22 19.03.22 12 346 C KAIG3-DD-EC-M-0039 3 DD-EC-M-FF-1006 SUBMITTAL # 1 1
KAIG3-DD-EC-M-0051
Site Energy Center 2 Chilled Water Pipe Work Layout Ground Floor Sheet 1
255 KAIG3 DD EC M HP 1001 0 16.12.20 30.12.20 30.12.20 14 790 C KAIG3-DD-EC-M-0039 0 1 1
of 3
Site Energy Center 2 Chilled Water Pipe Work Layout Ground Floor Sheet 1
256 KAIG3 DD EC M HP 1001 1 07.11.21 21.11.21 11.12.21 34 444 C KAIG3-DD-EC-M-0039 1 1 1
of 3
Site Energy Center 2 Chilled Water Pipe Work Layout Ground Floor Sheet 1
KAIG3 DD EC M HP 1001 2 30.01.22 13.02.22 14.02.22 15 379 C KAIG3-DD-EC-M-0039 2 1 1
of 3
Site Energy Center 2 Chilled Water Pipe Work Layout Ground Floor Sheet 1 SUPERSDED WITH SUBMITTAL # M-
KAIG3 DD EC M HP 1001 3 L 07.03.22 21.03.22 19.03.22 12 346 C KAIG3-DD-EC-M-0039 3 1 1
of 3 0055-00
Site Energy Center 2 Chilled Water Pipe Work Layout Ground Floor Sheet 2
257 KAIG3 DD EC M HP 1002 0 16.12.20 30.12.20 30.12.20 14 790 C KAIG3-DD-EC-M-0039 0 1 1
of 3
Site Energy Center 2 Chilled Water Pipe Work Layout Ground Floor Sheet 2
258 KAIG3 DD EC M HP 1002 1 07.11.21 21.11.21 11.12.21 34 444 C KAIG3-DD-EC-M-0039 1 1 1
of 3
Site Energy Center 2 Chilled Water Pipe Work Layout Ground Floor Sheet 2
KAIG3 DD EC M HP 1002 2 30.01.22 13.02.22 14.02.22 15 379 C KAIG3-DD-EC-M-0039 2 1 1
of 3
Site Energy Center 2 Chilled Water Pipe Work Layout Ground Floor Sheet 2 SUPERSDED WITH SUBMITTAL # M-
KAIG3 DD EC M HP 1002 3 L 07.03.22 21.03.22 19.03.22 12 346 C KAIG3-DD-EC-M-0039 3 1 1
of 3 0055-00
Site Energy Center 2 Chilled Water Pipe Work Layout Ground Floor Sheet 3
259 KAIG3 DD EC M HP 1003 0 16.12.20 30.12.20 30.12.20 14 790 C KAIG3-DD-EC-M-0039 0 1 1
of 3
Site Energy Center 2 Chilled Water Pipe Work Layout Ground Floor Sheet 3
260 KAIG3 DD EC M HP 1003 1 07.11.21 21.11.21 11.12.21 34 444 C KAIG3-DD-EC-M-0039 1 1 1
of 3
Site Energy Center 2 Chilled Water Pipe Work Layout Ground Floor Sheet 3
KAIG3 DD EC M HP 1003 2 30.01.22 13.02.22 14.02.22 15 379 C KAIG3-DD-EC-M-0039 2 1 1
of 3
Site Energy Center 2 Chilled Water Pipe Work Layout Ground Floor Sheet 3 SUPERSDED WITH SUBMITTAL # M-
KAIG3 DD EC M HP 1003 3 L 07.03.22 21.03.22 19.03.22 12 346 C KAIG3-DD-EC-M-0039 3 1 1
of 3 0055-00
Site Energy Center 2 Chilled Water Pipe Work Layout Roof Floor
261 KAIG3 DD EC M HP 1004 0 16.12.20 30.12.20 30.12.20 14 790 C KAIG3-DD-EC-M-0039 0 1 1
Sheet 1 of 2
Site Energy Center 2 Chilled Water Pipe Work Layout Roof Floor
262 KAIG3 DD EC M HP 1004 1 07.11.21 21.11.21 11.12.21 34 444 C KAIG3-DD-EC-M-0039 1 1 1
Sheet 1 of 2
Site Energy Center 2 Chilled Water Pipe Work Layout Roof Floor
KAIG3 DD EC M HP 1004 2 30.01.22 13.02.22 14.02.22 15 379 C KAIG3-DD-EC-M-0039 2 1 1
Sheet 1 of 2
Site Energy Center 2 Chilled Water Pipe Work Layout Roof Floor SUPERSDED WITH SUBMITTAL # M-
KAIG3 DD EC M HP 1004 3 L 07.03.22 21.03.22 19.03.22 12 346 C KAIG3-DD-EC-M-0039 3 1 1
Sheet 1 of 2 0055-00
Site Energy Center 2 Chilled Water Pipe Work Layout Roof Floor
263 KAIG3 DD EC M HP 1005 0 16.12.20 30.12.20 30.12.20 14 790 C KAIG3-DD-EC-M-0039 0 1 1
Sheet 2 of 2
Site Energy Center 2 Chilled Water Pipe Work Layout Roof Floor
264 KAIG3 DD EC M HP 1005 1 07.11.21 21.11.21 11.12.21 34 444 C KAIG3-DD-EC-M-0039 1 1 1
Sheet 2 of 2

Page 75 of 111 M.Sarfraz


481

146

178
Consultant : DAR

59

98
0

0
Cancelled/ Total
Open Code A Code B Code C Code D N/A Supersede submitt
d ed Main Contractor : ZHBG

Shop Drawing Submitted

Superseded / Cancelled
0 0 146 178 0 98 59 481 DESIGN DRAWING SUBMITTAL REGISTER Sub Contractor :
Discipline : Mechanical

For Information
MECHANICAL

Under Review
Rundate: 28-Feb-2023

Code N/A
Drawing Number Number of A B C D

Code A

Code B

Code C

Code D
Approval Average Days Number of
Sl No. Rev. Latest Rev. Description Submitted Date Received Date Days with Submittal Reference Number Rev. Remarks
Site Energy Center 2 Chilled Water Pipe Work Layout Roof Floor Required By Outstanding Days Held
KAIG3 DD EC M HP 1005 2 30.01.22 13.02.22 14.02.22 15 ZHBG
379 C KAIG3-DD-EC-M-0039 2 1 1
Sheet 2 of 2
Site Energy Center 2 Chilled Water Pipe Work Layout Roof Floor SUPERSDED WITH SUBMITTAL # M-
KAIG3 DD EC M HP 1005 3 L 07.03.22 21.03.22 19.03.22 12 346 C KAIG3-DD-EC-M-0039 3 1 1
Sheet 2 of 2 0055-00

265 KAIG3 DD EC M HP 1006 0 Site Energy Center 2 Ice Tank Pipe Work Layout Low Level Sheet 1 of 2 16.12.20 30.12.20 30.12.20 14 790 C KAIG3-DD-EC-M-0039 0 1 1

266 KAIG3 DD EC M HP 1006 1 Site Energy Center 2 Ice Tank Pipe Work Layout Low Level Sheet 1 of 2 07.11.21 21.11.21 11.12.21 34 444 C KAIG3-DD-EC-M-0039 1 1 1

KAIG3 DD EC M HP 1006 2 Site Energy Center 2 Ice Tank Pipe Work Layout Low Level Sheet 1 of 2 30.01.22 13.02.22 14.02.22 15 379 C KAIG3-DD-EC-M-0039 2 1 1

SUPERSDED WITH SUBMITTAL # M-


KAIG3 DD EC M HP 1006 3 L Site Energy Center 2 Ice Tank Pipe Work Layout Low Level Sheet 1 of 2 07.03.22 21.03.22 19.03.22 12 346 C KAIG3-DD-EC-M-0039 3 1 1
0055-00

267 KAIG3 DD EC M HP 1007 0 Site Energy Center 2 Ice Tank Pipe Work Layout Low Level Sheet 2 of 2 16.12.20 30.12.20 30.12.20 14 790 C KAIG3-DD-EC-M-0039 0 1 1

268 KAIG3 DD EC M HP 1007 1 Site Energy Center 2 Ice Tank Pipe Work Layout Low Level Sheet 2 of 2 07.11.21 21.11.21 11.12.21 34 444 C KAIG3-DD-EC-M-0039 1 1 1

KAIG3 DD EC M HP 1007 2 Site Energy Center 2 Ice Tank Pipe Work Layout Low Level Sheet 2 of 2 30.01.22 13.02.22 14.02.22 15 379 C KAIG3-DD-EC-M-0039 2 1 1

SUPERSDED WITH SUBMITTAL # M-


KAIG3 DD EC M HP 1007 3 L Site Energy Center 2 Ice Tank Pipe Work Layout Low Level Sheet 2 of 2 07.03.22 21.03.22 19.03.22 12 346 C KAIG3-DD-EC-M-0039 3 1 1
0055-00

269 KAIG3 DD EC M HP 6001 0 Site Energy Center 2 Pipe Works Schematics 16.12.20 30.12.20 30.12.20 14 790 C KAIG3-DD-EC-M-0039 0 1 1

270 KAIG3 DD EC M HP 6001 1 Site Energy Center 2 Pipe Works Schematics 07.11.21 21.11.21 11.12.21 34 444 C KAIG3-DD-EC-M-0039 1 1 1

KAIG3 DD EC M HP 6001 2 Site Energy Center 2 Pipe Works Schematics 30.01.22 13.02.22 14.02.22 15 379 C KAIG3-DD-EC-M-0039 2 1 1

SUPERSDED WITH SUBMITTAL # M-


KAIG3 DD EC M HP 6001 3 L Site Energy Center 2 Pipe Works Schematics 07.03.22 21.03.22 19.03.22 12 346 C KAIG3-DD-EC-M-0039 3 1 1
0055-00

271 KAIG3 DD EC M HP 6002 0 Site Energy Center 2 Heating Water Schematics Sheet 1 of 1 16.12.20 30.12.20 30.12.20 14 790 C KAIG3-DD-EC-M-0039 0 1 1

272 KAIG3 DD EC M HP 6002 1 Site Energy Center 2 Heating Water Schematics Sheet 1 of 1 07.11.21 21.11.21 11.12.21 34 444 C KAIG3-DD-EC-M-0039 1 1 1

KAIG3 DD EC M HP 6002 2 Site Energy Center 2 Heating Water Schematics Sheet 1 of 1 30.01.22 13.02.22 14.02.22 15 379 C KAIG3-DD-EC-M-0039 2 1 1

SUPERSDED WITH SUBMITTAL # M-


KAIG3 DD EC M HP 6002 3 L Site Energy Center 2 Heating Water Schematics Sheet 1 of 1 07.03.22 21.03.22 19.03.22 12 346 C KAIG3-DD-EC-M-0039 3 1 1
0055-00

273 KAIG3 DD EC M HP 6003 0 Site Energy Center 2 Ventilation Layout Roof Floor Sheet 1 of 2 16.12.20 30.12.20 30.12.20 14 790 C KAIG3-DD-EC-M-0039 0 1 1

274 KAIG3 DD EC M HP 6003 1 Site Energy Center 2 Ventilation Layout Roof Floor Sheet 1 of 2 07.11.21 21.11.21 11.12.21 34 444 C KAIG3-DD-EC-M-0039 1 1 1

KAIG3 DD EC M HP 6003 2 Site Energy Center 2 Ventilation Layout Roof Floor Sheet 1 of 2 30.01.22 13.02.22 14.02.22 15 379 C KAIG3-DD-EC-M-0039 2 1 1

SUPERSDED WITH SUBMITTAL # M-


KAIG3 DD EC M HP 6003 3 L Site Energy Center 2 Ventilation Layout Roof Floor Sheet 1 of 2 07.03.22 21.03.22 19.03.22 12 346 C KAIG3-DD-EC-M-0039 3 1 1
0055-00

275 KAIG3 DD EC M HP 6004 0 L Site Energy Center 2 Ventilation Layout Roof Floor Sheet 2 of 2 16.12.20 30.12.20 30.12.20 14 790 C KAIG3-DD-EC-M-0039 0 Should be delete from PCW 1 1

276 KAIG3 DD EC M HP 6005 0 Site Energy Center 2 Boiler Room Oil System Schematics 16.12.20 30.12.20 30.12.20 14 790 C KAIG3-DD-EC-M-0039 0 1 1

277 KAIG3 DD EC M HP 6005 1 Site Energy Center 2 Boiler Room Oil System Schematics 07.11.21 21.11.21 11.12.21 34 444 C KAIG3-DD-EC-M-0039 1 1 1

KAIG3 DD EC M HP 6005 2 Site Energy Center 2 Boiler Room Oil System Schematics 30.01.22 13.02.22 14.02.22 15 379 C KAIG3-DD-EC-M-0039 2 1 1

SUPERSDED WITH SUBMITTAL # M-


KAIG3 DD EC M HP 6005 3 L Site Energy Center 2 Boiler Room Oil System Schematics 07.03.22 21.03.22 19.03.22 12 346 C KAIG3-DD-EC-M-0039 3 1 1
0055-00
Site Energy Center 2 Ventilation Layout Ground Floor Sheet 1 of 2 With
278 KAIG3 DD EC M HV 1001 0 16.12.20 30.12.20 30.12.20 14 790 C KAIG3-DD-EC-M-0039 0 1 1
Calculation Hap for Energy Center
Site Energy Center 2 Ventilation Layout Ground Floor Sheet 1 of 2 With
279 KAIG3 DD EC M HV 1001 1 07.11.21 21.11.21 11.12.21 34 444 C KAIG3-DD-EC-M-0039 1 1 1
Calculation Hap for Energy Center
Site Energy Center 2 Ventilation Layout Ground Floor Sheet 1 of 2 With Supersded with draw # hv-1005
KAIG3 DD EC M HV 1001 2 L 07.03.22 21.03.22 19.03.22 12 346 C KAIG3-DD-EC-M-0039 3 1 1
Calculation Hap for Energy Center submittal # DD-0054

280 KAIG3 DD EC M HV 1002 0 Site Energy Center 2 Ventilation Layout Ground Floor Sheet 2 of 2 16.12.20 30.12.20 30.12.20 14 790 C KAIG3-DD-EC-M-0039 0 1 1

281 KAIG3 DD EC M HV 1002 1 Site Energy Center 2 Ventilation Layout Ground Floor Sheet 2 of 2 07.11.21 21.11.21 11.12.21 34 444 C KAIG3-DD-EC-M-0039 1 1 1

Supersded with draw # hv-1006


KAIG3 DD EC M HV 1002 2 L Site Energy Center 2 Ventilation Layout Ground Floor Sheet 2 of 2 07.03.22 21.03.22 19.03.22 12 346 C KAIG3-DD-EC-M-0039 3 1 1
submittal # DD-0054

282 KAIG3 DD EC M HV 1003 0 Site Energy Center 2 Ventilation Layout Roof Floor Sheet 1 of 2 16.12.20 30.12.20 30.12.20 14 790 C KAIG3-DD-EC-M-0039 0 1 1

283 KAIG3 DD EC M HV 1003 1 Site Energy Center 2 Ventilation Layout Roof Floor Sheet 1 of 2 07.11.21 21.11.21 11.12.21 34 444 C KAIG3-DD-EC-M-0039 1 1 1

Supersded with draw # hv-1007


KAIG3 DD EC M HV 1003 2 L Site Energy Center 2 Ventilation Layout Roof Floor Sheet 1 of 2 07.03.22 21.03.22 19.03.22 12 346 C KAIG3-DD-EC-M-0039 3 1 1
submittal # DD-0054

284 KAIG3 DD EC M HV 1004 0 Site Energy Center 2 Ventilation Layout Roof Floor Sheet 2 of 2 16.12.20 30.12.20 30.12.20 14 790 C KAIG3-DD-EC-M-0039 0 1 1

285 KAIG3 DD EC M HV 1004 1 Site Energy Center 2 Ventilation Layout Roof Floor Sheet 2 of 2 07.11.21 21.11.21 11.12.21 34 444 C KAIG3-DD-EC-M-0039 1 1 1

Supersded with draw # hv-1008


KAIG3 DD EC M HV 1004 2 L Site Energy Center 2 Ventilation Layout Roof Floor Sheet 2 of 2 07.03.22 21.03.22 19.03.22 12 346 C KAIG3-DD-EC-M-0039 3 1 1
submittal # DD-0054

286 KAIG3 DD EC M HV 6001 0 Site Energy Center 2 Ventilation Schematics Sheet 1 of 2 16.12.20 30.12.20 30.12.20 14 790 C KAIG3-DD-EC-M-0039 0 1 1

287 KAIG3 DD EC M HV 6001 1 Site Energy Center 2 Ventilation Schematics Sheet 1 of 2 07.11.21 21.11.21 11.12.21 34 444 C KAIG3-DD-EC-M-0039 1 1 1

Supersded with draw # hv-6003


KAIG3 DD EC M HV 6001 2 L Site Energy Center 2 Ventilation Schematics Sheet 1 of 2 07.03.22 21.03.22 19.03.22 12 346 C KAIG3-DD-EC-M-0039 3 1 1
submittal # DD-0054

288 KAIG3 DD EC M HV 6002 0 Site Energy Center 2 Ventilation Schematics Sheet 2 of 2 16.12.20 30.12.20 30.12.20 14 790 C KAIG3-DD-EC-M-0039 0 1 1

289 KAIG3 DD EC M HV 6002 1 Site Energy Center 2 Ventilation Schematics Sheet 2 of 2 07.11.21 21.11.21 11.12.21 34 444 C KAIG3-DD-EC-M-0039 1 1 1

Supersded with draw # hv-6004


KAIG3 DD EC M HV 6002 2 L Site Energy Center 2 Ventilation Schematics Sheet 2 of 2 07.03.22 21.03.22 19.03.22 12 346 C KAIG3-DD-EC-M-0039 3 1 1
submittal # DD-0054

290 KAIG3 DD EC M HV 8001 0 Site Energy Center 2 Schedule of Equipment Sheet 1 of 3 16.12.20 30.12.20 30.12.20 14 790 C KAIG3-DD-EC-M-0039 0 1 1

291 KAIG3 DD EC M HV 8001 1 Site Energy Center 2 Schedule of Equipment Sheet 1 of 3 07.11.21 21.11.21 11.12.21 34 444 C KAIG3-DD-EC-M-0039 1 1 1

Supersded with draw # hv-8004


KAIG3 DD EC M HV 8001 2 L Site Energy Center 2 Schedule of Equipment Sheet 1 of 3 07.03.22 21.03.22 19.03.22 12 346 C KAIG3-DD-EC-M-0039 3 1 1
submittal # DD-0054

Page 76 of 111 M.Sarfraz


481

146

178
Consultant : DAR

59

98
0

0
Cancelled/ Total
Open Code A Code B Code C Code D N/A Supersede submitt
d ed Main Contractor : ZHBG

Shop Drawing Submitted

Superseded / Cancelled
0 0 146 178 0 98 59 481 DESIGN DRAWING SUBMITTAL REGISTER Sub Contractor :
Discipline : Mechanical

For Information
MECHANICAL

Under Review
Rundate: 28-Feb-2023

Code N/A
Drawing Number Number of A B C D

Code A

Code B

Code C

Code D
Approval Average Days Number of
Sl No. Rev. Latest Rev. Description Submitted Date Received Date Days with Submittal Reference Number Rev. Remarks
Required By Outstanding Days Held
292 KAIG3 DD EC M HV 8002 0 Site Energy Center 2 Schedule of Equipment Sheet 2 of 3 16.12.20 30.12.20 30.12.20 14 ZHBG
790 C KAIG3-DD-EC-M-0039 0 1 1

293 KAIG3 DD EC M HV 8002 1 Site Energy Center 2 Schedule of Equipment Sheet 2 of 3 07.11.21 21.11.21 11.12.21 34 444 C KAIG3-DD-EC-M-0039 1 1 1

Supersded with draw # hv-8005


KAIG3 DD EC M HV 8002 2 L Site Energy Center 2 Schedule of Equipment Sheet 2 of 3 07.03.22 21.03.22 19.03.22 12 346 C KAIG3-DD-EC-M-0039 3 1 1
submittal # DD-0054

294 KAIG3 DD EC M HV 8003 0 Site Energy Center 2 Schedule of Equipment Sheet 3 of 3 16.12.20 30.12.20 30.12.20 14 790 C KAIG3-DD-EC-M-0039 0 1 1

295 KAIG3 DD EC M HV 8003 1 Site Energy Center 2 Schedule of Equipment Sheet 3 of 3 07.11.21 21.11.21 11.12.21 34 444 C KAIG3-DD-EC-M-0039 1 1 1

Supersded with draw # hv-8006


KAIG3 DD EC M HV 8003 2 L Site Energy Center 2 Schedule of Equipment Sheet 3 of 3 07.03.22 21.03.22 19.03.22 12 346 C KAIG3-DD-EC-M-0039 3 1 1
submittal # DD-0054

296 KAIG3 DD EC M WS 1001 0 Site Energy Center 2 Water Service Layout Ground Floor Sheet 1 of 1 16.12.20 30.12.20 30.12.20 14 790 C KAIG3-DD-EC-M-0039 0 1 1

297 KAIG3 DD EC M WS 1001 1 Site Energy Center 2 Water Service Layout Ground Floor Sheet 1 of 3 07.11.21 21.11.21 11.12.21 34 444 C KAIG3-DD-EC-M-0039 1 1 1

KAIG3 DD EC M WS 1001 2 L Site Energy Center 2 Water Service Layout Ground Floor Sheet 1 of 3 07.03.22 21.03.22 19.03.22 12 346 C KAIG3-DD-EC-M-0039 3 1 1

298 KAIG3 DD EC M WS 1002 0 Site Energy Center 2 Water Service Layout Ground Floor Sheet 2 of 3 07.11.21 21.11.21 11.12.21 34 444 C KAIG3-DD-EC-M-0039 1 1 1

KAIG3 DD EC M WS 1002 1 L Site Energy Center 2 Water Service Layout Ground Floor Sheet 2 of 3 07.03.22 21.03.22 19.03.22 12 346 C KAIG3-DD-EC-M-0039 3 1 1

299 KAIG3 DD EC M WS 1003 0 Site Energy Center 2 Water Service Layout Ground Floor Sheet 3 of 3 07.11.21 21.11.21 11.12.21 34 444 C KAIG3-DD-EC-M-0039 1 1 1

KAIG3 DD EC M WS 1003 1 L Site Energy Center 2 Water Service Layout Ground Floor Sheet 3 of 3 07.03.22 21.03.22 19.03.22 12 346 C KAIG3-DD-EC-M-0039 3 1 1

300 KAIG3 DD EC M WS 6001 0 Site Energy Center 2 Water Service Schematics 16.12.20 30.12.20 30.12.20 14 790 C KAIG3-DD-EC-M-0039 0 1 1

301 KAIG3 DD EC M WS 6001 1 Site Energy Center 2 Water Service Schematics 07.11.21 21.11.21 11.12.21 34 444 C KAIG3-DD-EC-M-0039 1 1 1

KAIG3 DD EC M WS 6001 2 L Site Energy Center 2 Water Service Schematics 07.03.22 21.03.22 19.03.22 12 346 C KAIG3-DD-EC-M-0039 3 1 1

302 KAIG3 DD FG M DP 1001 0 L Crescent 1 Family Garden Subsurface Drainage Layout 23.06.21 07.07.21 04.07.21 11 604 C KAIG3-DD-FG-M-0040 0 Cancelled as per MEP Dept email 1 1

303 KAIG3 DD GC M DP 1001 0 L Crescent 2 Garden of Choices Subsurface Drainage Layout 23.06.21 07.07.21 04.07.21 11 604 C KAIG3-DD-GC-M-0041 0 Cancelled as per MEP Dept email 1 1

304 KAIG3 DD LG M DP 1001 0 L Crescent 2 Policene Garden Subsurface Drainage Layout 23.06.21 07.07.21 04.07.21 11 604 C KAIG3-DD-LG-M-0042 0 Cancelled as per MEP Dept email 1 1

305 KAIG3 DD OG M DP 1001 0 L Crescent 2 Forest Garden (Devonian Garden) Subsurface Drainage Layout 23.06.21 07.07.21 04.07.21 11 604 C KAIG3-DD-OG-M-0043 0 Cancelled as per MEP Dept email 1 1

306 KAIG3 DD WT M WS 1002 0 L Potable & Fire Pump Layout 01.05.21 15.05.21 18.05.21 17 651 B KAIG3-DD-WT-M-0044 0 1 1

307 KAIG3 DD WT M WS 1003 0 L Potable & Fire Wall Sleeves Layout 01.05.21 15.05.21 18.05.21 17 651 B KAIG3-DD-WT-M-0044 0 1 1

308 KAIG3 DD WT M WS 1004 0 L Non-Potable Wall Sleeves Layout 01.05.21 15.05.21 18.05.21 17 651 B KAIG3-DD-WT-M-0044 0 1 1

309 KAIG3 DD CO M WS 1101 0 Crescents Overall Non-Potable Water System Sheet 1 of 5 09.06.21 23.06.21 22.06.21 13 616 C KAIG3-DD-CO-M-0045 0 1 1

310 KAIG3 DD CO M WS 1101 1 L Crescents Overall Non-Potable Water System Sheet 1 of 5 31.08.21 14.09.21 07.09.21 7 539 B KAIG3-DD-CO-M-0045 1 1 1

311 KAIG3 DD CO M WS 1102 0 Crescents Overall Non-Potable Water System Sheet 2 of 5 09.06.21 23.06.21 22.06.21 13 616 C KAIG3-DD-CO-M-0045 0 1 1

312 KAIG3 DD CO M WS 1102 1 L Crescents Overall Non-Potable Water System Sheet 2 of 5 31.08.21 14.09.21 07.09.21 7 539 B KAIG3-DD-CO-M-0045 1 1 1

313 KAIG3 DD CO M WS 1103 0 Crescents Overall Non-Potable Water System Sheet 3 of 5 09.06.21 23.06.21 22.06.21 13 616 C KAIG3-DD-CO-M-0045 0 1 1

314 KAIG3 DD CO M WS 1103 1 L Crescents Overall Non-Potable Water System Sheet 3 of 5 31.08.21 14.09.21 07.09.21 7 539 B KAIG3-DD-CO-M-0045 1 1 1

315 KAIG3 DD CO M WS 1104 0 Crescents Overall Non-Potable Water System Sheet 4 of 5 09.06.21 23.06.21 22.06.21 13 616 C KAIG3-DD-CO-M-0045 0 1 1

316 KAIG3 DD CO M WS 1104 1 L Crescents Overall Non-Potable Water System Sheet 4 of 5 31.08.21 14.09.21 07.09.21 7 539 B KAIG3-DD-CO-M-0045 1 1 1

317 KAIG3 DD CO M WS 1105 0 Crescents Overall Non-Potable Water System Sheet 5 of 5 09.06.21 23.06.21 22.06.21 13 616 C KAIG3-DD-CO-M-0045 0 1 1

318 KAIG3 DD CO M WS 1105 1 L Crescents Overall Non-Potable Water System Sheet 5 of 5 31.08.21 14.09.21 07.09.21 7 539 B KAIG3-DD-CO-M-0045 1 1 1

319 KAIG3 DD CO M WS 6101 0 Crescents Overall Non-Potable Water System Schematics 09.06.21 23.06.21 22.06.21 13 616 C KAIG3-DD-CO-M-0045 0 1 1

320 KAIG3 DD CO M WS 6101 1 L Crescents Overall Non-Potable Water System Schematics 31.08.21 14.09.21 07.09.21 7 539 B KAIG3-DD-CO-M-0045 1 1 1

321 KAIG3 DD WG M DP 1101 0 Water Garden Plant Room and Wet Well-E & Wet Well-F Plan Layout 09.12.21 23.12.21 16.12.21 7 439 C KAIG3-DD-WG-M-0046 0 1 1

322 KAIG3 DD WG M DP 1101 1 L Water Garden Plant Room and Wet Well-E & Wet Well-F Plan Layout 03.01.22 17.01.22 10.01.22 7 414 B KAIG3-DD-WG-M-0046 1 1 1

323 KAIG3 DD WG M DP 2101 0 Water Garden Plant Room and Wet Well-E & Wet Well-F Section 1 of 2 09.12.21 23.12.21 16.12.21 7 439 C KAIG3-DD-WG-M-0046 0 1 1

324 KAIG3 DD WG M DP 2101 1 L Water Garden Plant Room and Wet Well-E & Wet Well-F Section 1 of 2 03.01.22 17.01.22 10.01.22 7 414 B KAIG3-DD-WG-M-0046 1 1 1

325 KAIG3 DD WG M DP 2102 0 Water Garden Plant Room and Wet Well-E & Wet Well-F Section 2 of 2 09.12.21 23.12.21 16.12.21 7 439 C KAIG3-DD-WG-M-0046 0 1 1

326 KAIG3 DD WG M DP 2102 1 L Water Garden Plant Room and Wet Well-E & Wet Well-F Section 2 of 2 03.01.22 17.01.22 10.01.22 7 414 B KAIG3-DD-WG-M-0046 1 1 1

327 KAIG3 DD ST M DP 1001 0 Crescent 1 South Watch Tower Drainage Layout Sheet 1 of 2 05.01.22 19.01.22 24.01.22 19 400 C KAIG3-DD-ST-M-0047 0 1 1

Supserseded with Submittal # KAIG3-


KAIG3 DD ST M DP 1001 1 L Crescent 1 South Watch Tower Drainage Layout Sheet 1 of 2 19.05.22 02.06.22 09.06.22 21 264 C KAIG3-DD-ST-M-0047 1 1 1
DD-ST-M-0059-00

328 KAIG3 DD ST M DP 1002 0 Crescent 1 South Watch Tower Drainage Layout Sheet 2 of 2 05.01.22 19.01.22 24.01.22 19 400 C KAIG3-DD-ST-M-0047 0 1 1

Supserseded with Submittal # KAIG3-


KAIG3 DD ST M DP 1002 1 L Crescent 1 South Watch Tower Drainage Layout Sheet 2 of 2 19.05.22 02.06.22 09.06.22 21 264 C KAIG3-DD-ST-M-0047 1 1 1
DD-ST-M-0059-00

329 KAIG3 DD ST M FF 1001 0 Crescent 1 South Watch Tower Fire Fighting Layout 05.01.22 19.01.22 24.01.22 19 400 C KAIG3-DD-ST-M-0047 0 1 1

Superseded with Submittal # KAIG3-


KAIG3 DD ST M FF 1001 1 L Crescent 1 South Watch Tower Fire Fighting Layout 19.05.22 02.06.22 09.06.22 21 264 C KAIG3-DD-ST-M-0047 1 1 1
DD-ST-M-0058-00
Crescent 1 South Watch Tower Ventilation Layout Sheet 1 of 2 ( Attached
330 KAIG3 DD ST M HV 1001 0 05.01.22 19.01.22 24.01.22 19 400 C KAIG3-DD-ST-M-0047 0 1 1
HVAC Calculation Loads)

Page 77 of 111 M.Sarfraz


481

146

178
Consultant : DAR

59

98
0

0
Cancelled/ Total
Open Code A Code B Code C Code D N/A Supersede submitt
d ed Main Contractor : ZHBG

Shop Drawing Submitted

Superseded / Cancelled
0 0 146 178 0 98 59 481 DESIGN DRAWING SUBMITTAL REGISTER Sub Contractor :
Discipline : Mechanical

For Information
MECHANICAL

Under Review
Rundate: 28-Feb-2023

Code N/A
Drawing Number Number of A B C D

Code A

Code B

Code C

Code D
Approval Average Days Number of
Sl No. Rev. Latest Rev. Description Submitted Date Received Date Days with Submittal Reference Number Rev. Remarks
Crescent 1 South Watch Tower Ventilation Layout Sheet 1 of 2 ( Attached Required By Outstanding Days Held
KAIG3 DD ST M HV 1001 1 L 19.05.22 02.06.22 09.06.22 21 ZHBG
264 C KAIG3-DD-ST-M-0047 1 1 1
HVAC Calculation Loads)

331 KAIG3 DD ST M HV 1002 0 Crescent 1 South Watch Tower Ventilation Layout Sheet 2 of 2 05.01.22 19.01.22 24.01.22 19 400 C KAIG3-DD-ST-M-0047 0 1 1

KAIG3 DD ST M HV 1002 1 L Crescent 1 South Watch Tower Ventilation Layout Sheet 2 of 2 19.05.22 02.06.22 09.06.22 21 264 C KAIG3-DD-ST-M-0047 1 1 1

332 KAIG3 DD ST M HV 8001 0 Crescent 1 South Watch Tower Schedule of Equipment 05.01.22 19.01.22 24.01.22 19 400 C KAIG3-DD-ST-M-0047 0 1 1

KAIG3 DD ST M HV 8001 1 L Crescent 1 South Watch Tower Schedule of Equipment 19.05.22 02.06.22 09.06.22 21 264 C KAIG3-DD-ST-M-0047 1 1 1

333 KAIG3 DD NT M DP 1001 0 Crescent 1 North Watch Tower Drainage Layout Sheet 1 of 2 05.01.22 19.01.22 25.01.22 20 399 C KAIG3-DD-NT-M-0048 0 1 1

KAIG3 DD NT M DP 1001 1 L Crescent 1 North Watch Tower Drainage Layout Sheet 1 of 2 17.05.22 31.05.22 05.06.22 19 268 C KAIG3-DD-NT-M-0048 1 1 1

334 KAIG3 DD NT M DP 1002 0 Crescent 1 North Watch Tower Drainage Layout Sheet 2 of 2 05.01.22 19.01.22 25.01.22 20 399 C KAIG3-DD-NT-M-0048 0 1 1

KAIG3 DD NT M DP 1002 1 L Crescent 1 North Watch Tower Drainage Layout Sheet 2 of 2 17.05.22 31.05.22 05.06.22 19 268 C KAIG3-DD-NT-M-0048 1 1 1

335 KAIG3 DD NT M FF 1001 0 Crescent 1 North Watch Tower Fire Fighting Layout 05.01.22 19.01.22 25.01.22 20 399 C KAIG3-DD-NT-M-0048 0 1 1

KAIG3 DD NT M FF 1001 1 L Crescent 1 North Watch Tower Fire Fighting Layout 17.05.22 31.05.22 05.06.22 19 268 C KAIG3-DD-NT-M-0048 1 1 1

336 KAIG3 DD NT M HV 1002 0 Crescent 1 North Watch Tower Ventilation Layout Sheet 2 of 2 05.01.22 19.01.22 25.01.22 20 399 C KAIG3-DD-NT-M-0048 0 1 1

KAIG3 DD NT M HV 1002 1 L Crescent 1 North Watch Tower Ventilation Layout Sheet 2 of 2 17.05.22 31.05.22 05.06.22 19 268 C KAIG3-DD-NT-M-0048 1 1 1

Crescent 1 North Watch Tower Ventilation Layout Sheet 1 of 2 ( Attached


337 KAIG3 DD NT M HV 1003 0 05.01.22 19.01.22 25.01.22 20 399 C KAIG3-DD-NT-M-0048 0 1 1
HVAC Calculation Loads)
Crescent 1 North Watch Tower Ventilation Layout Sheet 1 of 2 ( Attached
KAIG3 DD NT M HV 1003 1 L 17.05.22 31.05.22 05.06.22 19 268 C KAIG3-DD-NT-M-0048 1 1 1
HVAC Calculation Loads)

338 KAIG3 DD NT M HV 8001 0 Crescent 1 North Watch Tower Schedule of Equipment 05.01.22 19.01.22 25.01.22 20 399 C KAIG3-DD-NT-M-0048 0 1 1

KAIG3 DD NT M HV 8001 1 L Crescent 1 North Watch Tower Schedule of Equipment 17.05.22 31.05.22 05.06.22 19 268 C KAIG3-DD-NT-M-0048 1 1 1

Crescent 1 South Watch Tower Water Services Layout Sheet 1 of 1


339 KAIG3 DD ST M WS 1001 0 08.01.22 22.01.22 25.01.22 17 399 C KAIG3-DD-ST-M-0049 0 1 1
( Attached Calculation Load For water Services At South Watch Tower)
Crescent 1 South Watch Tower Water Services Layout Sheet 1 of 1
KAIG3 DD ST M WS 1001 1 19.05.22 02.06.22 07.06.22 19 266 C KAIG3-DD-ST-M-0049 1 1 1
( Attached Calculation Load For water Services At South Watch Tower)
Crescent 1 South Watch Tower Water Services Layout Sheet 1 of 1
KAIG3 DD ST M WS 1001 2 L 17.07.22 31.07.22 27.07.22 10 216 C KAIG3-DD-ST-M-0049 2 1 1
( Attached Calculation Load For water Services At South Watch Tower)

KAIG3 DD ST M WS 1002 0 South Watch Tower Water Services Layout Sheet 2 of 2 19.05.22 02.06.22 07.06.22 19 266 C KAIG3-DD-ST-M-0049 1 1 1

KAIG3 DD ST M WS 1002 1 L South Watch Tower Water Services Layout Sheet 2 of 2 17.07.22 31.07.22 27.07.22 10 216 C KAIG3-DD-ST-M-0049 2 1 1

340 KAIG3 DD ST M WS 6001 0 Crescent 1 South Watch Tower Water Services Schematics 08.01.22 22.01.22 25.01.22 17 399 C KAIG3-DD-ST-M-0049 0 1 1

KAIG3 DD ST M WS 6001 1 Crescent 1 South Watch Tower Water Services Schematics 19.05.22 02.06.22 07.06.22 19 266 C KAIG3-DD-ST-M-0049 1 1 1

KAIG3 DD ST M WS 6001 2 L Crescent 1 South Watch Tower Water Services Schematics 17.07.22 31.07.22 27.07.22 10 216 C KAIG3-DD-ST-M-0049 2 1 1

Crescent 1 North Watch Tower Water Services Layout Sheet 1 of 1


341 KAIG3 DD NT M WS 1001 0 08.01.22 22.01.22 25.01.22 17 399 C KAIG3-DD-NT-M-0050 0 1 1
( Attached Calculation Laods For Water Services At North Watch Tower )

Crescent 1 North Watch Tower Water Services Layout Sheet 1 of 1


KAIG3 DD NT M WS 1001 1 17.05.22 31.05.22 28.05.22 11 276 C KAIG3-DD-NT-M-0050 1 1 1
( Attached Calculation Laods For Water Services At North Watch Tower )

Crescent 1 North Watch Tower Water Services Layout Sheet 1 of 1


KAIG3 DD NT M WS 1001 2 L 11.06.22 25.06.22 27.07.22 46 216 C KAIG3-DD-NT-M-0050 2 1 1
( Attached Calculation Laods For Water Services At North Watch Tower )

342 KAIG3 DD NT M WS 6001 0 Crescent 1 North Watch Tower Water Services Schematics 08.01.22 22.01.22 25.01.22 17 399 C KAIG3-DD-NT-M-0050 0 1 1

KAIG3 DD NT M WS 6001 1 Crescent 1 North Watch Tower Water Services Schematics 17.05.22 31.05.22 28.05.22 11 276 C KAIG3-DD-NT-M-0050 1 1 1

KAIG3 DD NT M WS 6001 2 L Crescent 1 North Watch Tower Water Services Schematics 11.06.22 25.06.22 27.07.22 46 216 C KAIG3-DD-NT-M-0050 2 1 1

343 KAIG3 DD EC M FF 1004 0 L Site Energy Center 2 Fire Fighting Layout Ground Floor Sheet 1 of 3 22.03.22 05.04.22 09.04.22 18 325 B KAIG3-DD-EC-M-0051 0 1 1

344 KAIG3 DD EC M FF 1005 0 L Site Energy Center 2 Fire Fighting Layout Ground Floor Sheet 2 of 3 22.03.22 05.04.22 09.04.22 18 325 B KAIG3-DD-EC-M-0051 0 1 1

345 KAIG3 DD EC M FF 1006 0 L Site Energy Center 2 Fire Fighting Layout Ground Floor Sheet 3 of 3 22.03.22 05.04.22 09.04.22 18 325 B KAIG3-DD-EC-M-0051 0 1 1

346 KAIG3 DD EC M DP 1013 0 L Site Energy Center 2 Drainage Layout Ground Floor Sheet 1 of 6 07.04.22 21.04.22 26.04.22 19 308 B KAIG3-DD-EC-M-0053 0 1 1

347 KAIG3 DD EC M DP 1014 0 L Site Energy Center 2 Drainage Layout Ground Floor Sheet 2 of 6 07.04.22 21.04.22 26.04.22 19 308 B KAIG3-DD-EC-M-0053 0 1 1

348 KAIG3 DD EC M DP 1015 0 L Site Energy Center 2 Drainage Layout Ground Floor Sheet 3 of 6 07.04.22 21.04.22 26.04.22 19 308 B KAIG3-DD-EC-M-0053 0 1 1

349 KAIG3 DD EC M DP 1016 0 L Site Energy Center 2 Drainage Layout Ground Floor Sheet 4 of 6 07.04.22 21.04.22 26.04.22 19 308 B KAIG3-DD-EC-M-0053 0 1 1

350 KAIG3 DD EC M DP 1017 0 L Site Energy Center 2 Drainage Layout Ground Floor Sheet 5 of 6 07.04.22 21.04.22 26.04.22 19 308 B KAIG3-DD-EC-M-0053 0 1 1

351 KAIG3 DD EC M DP 1018 0 L Site Energy Center 2 Drainage Layout Ground Floor Sheet 6 of 6 07.04.22 21.04.22 26.04.22 19 308 B KAIG3-DD-EC-M-0053 0 1 1

352 KAIG3 DD EC M DP 1019 0 L Site Energy Center 2 Drainage Layout Mezzanine Floor Sheet 1 of 3 07.04.22 21.04.22 26.04.22 19 308 B KAIG3-DD-EC-M-0053 0 1 1

353 KAIG3 DD EC M DP 1020 0 L Site Energy Center 2 Drainage Layout Mezzanine Floor Sheet 2 of 3 07.04.22 21.04.22 26.04.22 19 308 B KAIG3-DD-EC-M-0053 0 1 1

354 KAIG3 DD EC M DP 1021 0 L Site Energy Center 2 Drainage Layout Mezzanine Floor Sheet 3 of 3 07.04.22 21.04.22 26.04.22 19 308 B KAIG3-DD-EC-M-0053 0 1 1

355 KAIG3 DD EC M DP 1022 0 L Site Energy Center 2 Drainage Layout Roof Floor Sheet 1 of 3 07.04.22 21.04.22 26.04.22 19 308 B KAIG3-DD-EC-M-0053 0 1 1

356 KAIG3 DD EC M DP 1023 0 L Site Energy Center 2 Drainage Layout Roof Floor Sheet 2 of 3 07.04.22 21.04.22 26.04.22 19 308 B KAIG3-DD-EC-M-0053 0 1 1

357 KAIG3 DD EC M DP 1024 0 L Site Energy Center 2 Drainage Layout Roof Floor Sheet 3 of 3 07.04.22 21.04.22 26.04.22 19 308 B KAIG3-DD-EC-M-0053 0 1 1

358 KAIG3 DD EC M WS 1004 0 Site Energy Center 2 Water Services Layout Ground Floor Sheet 1 of 3 09.04.22 23.04.22 23.04.22 14 311 C KAIG3-DD-EC-M-0052 0 1 1

Page 78 of 111 M.Sarfraz


481

146

178
Consultant : DAR

59

98
0

0
Cancelled/ Total
Open Code A Code B Code C Code D N/A Supersede submitt
d ed Main Contractor : ZHBG

Shop Drawing Submitted

Superseded / Cancelled
0 0 146 178 0 98 59 481 DESIGN DRAWING SUBMITTAL REGISTER Sub Contractor :
Discipline : Mechanical

For Information
MECHANICAL

Under Review
Rundate: 28-Feb-2023

Code N/A
Drawing Number Number of A B C D

Code A

Code B

Code C

Code D
Approval Average Days Number of
Sl No. Rev. Latest Rev. Description Submitted Date Received Date Days with Submittal Reference Number Rev. Remarks
Required By Outstanding Days Held
KAIG3 DD EC M WS 1004 1 L Site Energy Center 2 Water Services Layout Ground Floor Sheet 1 of 3 28.08.22 11.09.22 13.09.22 16 ZHBG
168 B KAIG3-DD-EC-M-0052 1 1 1

359 KAIG3 DD EC M WS 1005 0 Site Energy Center 2 Water Services Layout Ground Floor Sheet 2 of 3 09.04.22 23.04.22 23.04.22 14 311 C KAIG3-DD-EC-M-0052 0 1 1

KAIG3 DD EC M WS 1005 1 L Site Energy Center 2 Water Services Layout Ground Floor Sheet 2 of 3 28.08.22 11.09.22 13.09.22 16 168 B KAIG3-DD-EC-M-0052 1 1 1

360 KAIG3 DD EC M WS 1006 0 Site Energy Center 2 Water Services Layout Ground Floor Sheet 3 of 3 09.04.22 23.04.22 23.04.22 14 311 C KAIG3-DD-EC-M-0052 0 1 1

KAIG3 DD EC M WS 1006 1 L Site Energy Center 2 Water Services Layout Ground Floor Sheet 3 of 3 28.08.22 11.09.22 13.09.22 16 168 B KAIG3-DD-EC-M-0052 1 1 1

361 KAIG3 DD EC M WS 6002 0 Site Energy Center 2 Water Services Schematics 09.04.22 23.04.22 23.04.22 14 311 C KAIG3-DD-EC-M-0052 0 1 1

KAIG3 DD EC M WS 6002 1 L Site Energy Center 2 Water Services Schematics 28.08.22 11.09.22 13.09.22 16 168 B KAIG3-DD-EC-M-0052 1 1 1

362 KAIG3 DD EC M HV 1005 0 Site Energy Center 2 Ventilation Layout Ground Floor Sheet 1 of 2 23.05.22 06.06.22 25.06.22 33 248 C KAIG3-DD-EC-M-0054 0 1 1

KAIG3 DD EC M HV 1005 1 L Site Energy Center 2 Ventilation Layout Ground Floor Sheet 1 of 2 03.10.22 17.10.22 17.10.22 14 134 B KAIG3-DD-EC-M-0054 1 1 1

363 KAIG3 DD EC M HV 1006 0 Site Energy Center 2 Ventilation Layout Ground Floor Sheet 2 of 2 23.05.22 06.06.22 25.06.22 33 248 C KAIG3-DD-EC-M-0054 0 1 1

KAIG3 DD EC M HV 1006 1 L Site Energy Center 2 Ventilation Layout Ground Floor Sheet 2 of 2 03.10.22 17.10.22 17.10.22 14 134 B KAIG3-DD-EC-M-0054 1 1 1

364 KAIG3 DD EC M HV 1007 0 Site Energy Center 2 Ventilation Layout Roof Floor Sheet 1 of 2 23.05.22 06.06.22 25.06.22 33 248 C KAIG3-DD-EC-M-0054 0 1 1

KAIG3 DD EC M HV 1007 1 L Site Energy Center 2 Ventilation Layout Roof Floor Sheet 1 of 2 03.10.22 17.10.22 17.10.22 14 134 B KAIG3-DD-EC-M-0054 1 1 1

365 KAIG3 DD EC M HV 1008 0 Site Energy Center 2 Ventilation Layout Roof Floor Sheet 2 of 2 23.05.22 06.06.22 25.06.22 33 248 C KAIG3-DD-EC-M-0054 0 1 1

KAIG3 DD EC M HV 1008 1 L Site Energy Center 2 Ventilation Layout Roof Floor Sheet 2 of 2 03.10.22 17.10.22 17.10.22 14 134 B KAIG3-DD-EC-M-0054 1 1 1

366 KAIG3 DD EC M HV 6003 0 Site Energy Center 2 Ventilation Schematics Sheet 1 of 2 23.05.22 06.06.22 25.06.22 33 248 C KAIG3-DD-EC-M-0054 0 1 1

KAIG3 DD EC M HV 6003 1 L Site Energy Center 2 Ventilation Schematics Sheet 1 of 2 03.10.22 17.10.22 17.10.22 14 134 B KAIG3-DD-EC-M-0054 1 1 1

367 KAIG3 DD EC M HV 6004 0 Site Energy Center 2 Ventilation Schematics Sheet 2 of 2 23.05.22 06.06.22 25.06.22 33 248 C KAIG3-DD-EC-M-0054 0 1 1

KAIG3 DD EC M HV 6004 1 L Site Energy Center 2 Ventilation Schematics Sheet 2 of 2 03.10.22 17.10.22 17.10.22 14 134 B KAIG3-DD-EC-M-0054 1 1 1

368 KAIG3 DD EC M HV 8004 0 Site Energy Center 2 Schedule of Equipment Sheet 1 of 3 23.05.22 06.06.22 25.06.22 33 248 C KAIG3-DD-EC-M-0054 0 1 1

KAIG3 DD EC M HV 8004 1 L Site Energy Center 2 Schedule of Equipment Sheet 1 of 3 03.10.22 17.10.22 17.10.22 14 134 B KAIG3-DD-EC-M-0054 1 1 1

369 KAIG3 DD EC M HV 8005 0 Site Energy Center 2 Schedule of Equipment Sheet 2 of 3 23.05.22 06.06.22 25.06.22 33 248 C KAIG3-DD-EC-M-0054 0 1 1

KAIG3 DD EC M HV 8005 1 L Site Energy Center 2 Schedule of Equipment Sheet 2 of 3 03.10.22 17.10.22 17.10.22 14 134 B KAIG3-DD-EC-M-0054 1 1 1

KAIG3 DD EC M HV 8006 0 Site Energy Center 2 Schedule of Equipment Sheet 3 of 3 23.05.22 06.06.22 25.06.22 33 248 C KAIG3-DD-EC-M-0054 0 1 1

KAIG3 DD EC M HV 8006 1 L Site Energy Center 2 Schedule of Equipment Sheet 3 of 3 03.10.22 17.10.22 17.10.22 14 134 B KAIG3-DD-EC-M-0054 1 1 1

Site Energy Center 2 Chilled Water PipeWork Layout Ground Floor Sheet 1
### KAIG3 DD EC M HP 1008 0 24.05.22 07.06.22 13.06.22 20 260 C KAIG3-DD-EC-M-0055 0 1 1
of 3
Site Energy Center 2 Chilled Water PipeWork Layout Ground Floor Sheet 1
KAIG3 DD EC M HP 1008 1 L 23.06.22 07.07.22 13.07.22 20 230 B KAIG3-DD-EC-M-0055 1 1 1
of 3
Site Energy Center 2 Chilled Water PipeWork Layout Ground Floor Sheet 2
### KAIG3 DD EC M HP 1009 0 24.05.22 07.06.22 13.06.22 20 260 C KAIG3-DD-EC-M-0055 0 1 1
of 3
Site Energy Center 2 Chilled Water PipeWork Layout Ground Floor Sheet 2
KAIG3 DD EC M HP 1009 1 L 23.06.22 07.07.22 13.07.22 20 230 B KAIG3-DD-EC-M-0055 1 1 1
of 3
Site Energy Center 2 Chilled Water PipeWork Layout Ground Floor Sheet 3
### KAIG3 DD EC M HP 1010 0 24.05.22 07.06.22 13.06.22 20 260 C KAIG3-DD-EC-M-0055 0 1 1
of 3
Site Energy Center 2 Chilled Water PipeWork Layout Ground Floor Sheet 3
KAIG3 DD EC M HP 1010 1 L 23.06.22 07.07.22 13.07.22 20 230 B KAIG3-DD-EC-M-0055 1 1 1
of 3
Site Energy Center 2 Chilled Water PipeWork Layout Roof Floor Sheet 1 of
### KAIG3 DD EC M HP 1011 0 24.05.22 07.06.22 13.06.22 20 260 C KAIG3-DD-EC-M-0055 0 1 1
2
Site Energy Center 2 Chilled Water PipeWork Layout Roof Floor Sheet 1 of
KAIG3 DD EC M HP 1011 1 L 23.06.22 07.07.22 13.07.22 20 230 B KAIG3-DD-EC-M-0055 1 1 1
2
Site Energy Center 2 Chilled Water PipeWork Layout Roof Floor Sheet 2 of
### KAIG3 DD EC M HP 1012 0 24.05.22 07.06.22 13.06.22 20 260 C KAIG3-DD-EC-M-0055 0 1 1
2
Site Energy Center 2 Chilled Water PipeWork Layout Roof Floor Sheet 2 of
KAIG3 DD EC M HP 1012 1 L 23.06.22 07.07.22 13.07.22 20 230 B KAIG3-DD-EC-M-0055 1 1 1
2

### KAIG3 DD EC M HP 1013 0 Site Energy Center 2 ICE Tank PipeWork Layout Low Level Sheet 1 of 2 24.05.22 07.06.22 13.06.22 20 260 C KAIG3-DD-EC-M-0055 0 1 1

KAIG3 DD EC M HP 1013 1 L Site Energy Center 2 ICE Tank PipeWork Layout Low Level Sheet 1 of 2 23.06.22 07.07.22 13.07.22 20 230 B KAIG3-DD-EC-M-0055 1 1 1

### KAIG3 DD EC M HP 1014 0 Site Energy Center 2 ICE Tank PipeWork Layout Low Level Sheet 2 of 2 24.05.22 07.06.22 13.06.22 20 260 C KAIG3-DD-EC-M-0055 0 1 1

KAIG3 DD EC M HP 1014 1 L Site Energy Center 2 ICE Tank PipeWork Layout Low Level Sheet 2 of 2 23.06.22 07.07.22 13.07.22 20 230 B KAIG3-DD-EC-M-0055 1 1 1

### KAIG3 DD EC M HP 6006 0 ite Energy Center 2 PipeWork Schematics 24.05.22 07.06.22 13.06.22 20 260 C KAIG3-DD-EC-M-0055 0 1 1

KAIG3 DD EC M HP 6006 1 L ite Energy Center 2 PipeWork Schematics 23.06.22 07.07.22 13.07.22 20 230 B KAIG3-DD-EC-M-0055 1 1 1

### KAIG3 DD EC M HP 6007 0 Site Energy Center 2 Heating Water Schematics Sheet 1 of 2 24.05.22 07.06.22 13.06.22 20 260 C KAIG3-DD-EC-M-0055 0 1 1

KAIG3 DD EC M HP 6007 1 L Site Energy Center 2 Heating Water Schematics Sheet 1 of 2 23.06.22 07.07.22 13.07.22 20 230 B KAIG3-DD-EC-M-0055 1 1 1

### KAIG3 DD EC M HP 6008 0 Site Energy Center 2 Chilled Water Schematics Sheet 2 of 2 24.05.22 07.06.22 13.06.22 20 260 C KAIG3-DD-EC-M-0055 0 1 1

KAIG3 DD EC M HP 6008 1 L Site Energy Center 2 Chilled Water Schematics Sheet 2 of 2 23.06.22 07.07.22 13.07.22 20 230 B KAIG3-DD-EC-M-0055 1 1 1

Site Energy Center 2 Fuel Oil System For Boilers And Generators in Energy
### KAIG3 DD EC M HP 6009 0 24.05.22 07.06.22 13.06.22 20 260 C KAIG3-DD-EC-M-0055 0 1 1
Cenete
Site Energy Center 2 Fuel Oil System For Boilers And Generators in Energy
KAIG3 DD EC M HP 6009 1 L 23.06.22 07.07.22 13.07.22 20 230 C KAIG3-DD-EC-M-0055 1 1 1
Cenete

### KAIG3 DD NT M FF 1002 0 L North Watch Tower Fire Fighting Layout 21.06.22 05.07.22 20.07.22 29 223 C KAIG3-DD-NT-M-0056 0 1 1

Page 79 of 111 M.Sarfraz


481

146

178
Consultant : DAR

59

98
0

0
Cancelled/ Total
Open Code A Code B Code C Code D N/A Supersede submitt
d ed Main Contractor : ZHBG

Shop Drawing Submitted

Superseded / Cancelled
0 0 146 178 0 98 59 481 DESIGN DRAWING SUBMITTAL REGISTER Sub Contractor :
Discipline : Mechanical

For Information
MECHANICAL

Under Review
Rundate: 28-Feb-2023

Code N/A
Drawing Number Number of A B C D

Code A

Code B

Code C

Code D
Approval Average Days Number of
Sl No. Rev. Latest Rev. Description Submitted Date Received Date Days with Submittal Reference Number Rev. Remarks
Required By Outstanding Days Held
### KAIG3 DD ST M FF 1002 0 L South Watch Tower Fire Fighting Layout 17.07.22 31.07.22 25.07.22 8 ZHBG
218 C KAIG3-DD-ST-M-0058 0 1 1

### KAIG3 DD ST M DP 1003 0 L South Watch Tower Drainage Layout Sheet 1 of 2 17.07.22 31.07.22 23.07.22 6 220 C KAIG3-DD-ST-M-0059 0 1 1

### KAIG3 DD ST M DP 1004 0 L South Watch Tower Drainage Layout Sheet 2 of 2 17.07.22 31.07.22 23.07.22 6 220 C KAIG3-DD-ST-M-0059 0 1 1

### 44985

### 44985

### 44985

### 44985

### 44985

### 44985

### 44985

### 44985

### 44985

### 44985

### 44985 44985 0 481 59 0 146 178 0 98 0 0

### 44985

Page 80 of 111 M.Sarfraz


Consultant : DAR

0
Cancelled/ Total
Open Code A Code B Code C Code D
Superseded Received Main Contractor : ZHBG

Shop Drawing Submitted

Superseded / Cancelled
0 0 0 0 0 0 0 DESIGN DRAWING SUBMITTAL REGISTER Sub Contractor :
Discipline : Mechanical

For Information

Under Review
MECHANICAL-HVAC Rundate: 28-Feb-2023
Drawing Number A B C D

Code A

Code B

Code C

Code D
Approval Average Days Number of
Sl No. Rev. Latest Rev. Description Submitted Date Received Date Submittal Reference Number Rev. Remarks
Required By Outstanding Days Held
Project Contracto Building Discpline Dwg No

1 13.01.00 44985

2 13.01.00 44985

3 13.01.00 44985

4 13.01.00 44985

5 13.01.00 44985

6 13.01.00 44985

7 13.01.00 44985

8 13.01.00 44985

9 13.01.00 44985

10 13.01.00 44985

11 13.01.00 44985

12 13.01.00 44985

13 13.01.00 44985

14 13.01.00 44985

15 13.01.00 44985

16 13.01.00 44985

17 13.01.00 44985

18 13.01.00 44985

19 13.01.00 44985

20 13.01.00 44985

44985 0 0 0 0 0 0 0 0 0

Page 81 of 111 M.Sarfraz


Consultant : DAR

84

46

38
0

0
Cancelled/ Total
Open Code A Code B Code C Code D
Superseded Received Main Contractor : ZHBG

Shop Drawing Submitted

Superseded / Cancelled
0 0 38 0 0 46 84 DESIGN DRAWING SUBMITTAL REGISTER Sub Contractor :
Discipline : Mechanical

For Information
MECHANICAL-PLUMBIBG

Under Review
Rundate: 28-Feb-2023
Drawing Number Number of A B C D

Code A

Code B

Code C

Code D
Approval Average Days Number of
Sl No. Rev. Latest Rev. Description Submitted Date Received Date Days with Submittal Reference Number Rev. Remarks
Required By Outstanding Days Held
Project Contracto Building Discpline Dwg No ZHBG

Crescent 2 Reception & Child Care Low Level Drainage Layout Ground
1 KAIG3 DD CC P DP 1002 0 L 07.11.19 21.11.19 11.11.19 4 1205 B KAIG3-DWG-NM-P-0001-00 0 1 1
Floor

2 KAIG3 DD CC P WS 1001 0 L Crescent 2 Reception & Child Care Water Service Ground Floor 07.11.19 21.11.19 11.11.19 4 1205 B KAIG3-DWG-NM-P-0001-00 0 1 1

3 KAIG3 DD CC P WS 8003 0 L crescent 2 Reception & Child Care Water Service Schematic 07.11.19 21.11.19 11.11.19 4 1205 B KAIG3-DWG-NM-P-0001-00 0 1 1

4 KAIG3 DD NM P DP 1003 0 L Crescent 1 North Small Mosque High/low Level Draiange Layout First Floor 07.11.19 21.11.19 10.11.19 3 1206 B KAIG3-DWG-NM-P-0002-00 0 1 1

5 KAIG3 DD NM P DP 1004 0 L Crescent 1 North Small Mosque High/low Level Draiange Layout First Floor 07.11.19 21.11.19 10.11.19 3 1206 B KAIG3-DWG-NM-P-0002-00 0 1 1

6 KAIG3 DD NM P WS 1001 0 L Crescent 1 North Small Mosque Water Service Layout Ground Floor 07.11.19 21.11.19 10.11.19 3 1206 B KAIG3-DWG-NM-P-0002-00 0 1 1

7 KAIG3 DD NM P WS 1002 0 L Crescent 1 North Small Mosque Water Service Layout First Floor 07.11.19 21.11.19 10.11.19 3 1206 B KAIG3-DWG-NM-P-0002-00 0 1 1

8 KAIG3 DD NM P WS 8005 0 L Crescent 1 North Small Mosque Water Service Schematics 07.11.19 21.11.19 10.11.19 3 1206 B KAIG3-DWG-NM-P-0002-00 0 1 1

9 KAIG3 DD MB P DP 1003 0 L Site Management & Maintenance Low Level Drainage Layout Ground Floor 09.11.19 23.11.19 13.11.19 4 1203 B KAIG3-DWG-MB-P-0003-00 0 1 1

10 KAIG3 DD MB P DP 1004 0 L Site Management & Maintenance Drainage Toilets Layout Ground Floor 09.11.19 23.11.19 13.11.19 4 1203 B KAIG3-DWG-MB-P-0003-00 0 1 1

Site Management & Maintenance Water Services and Drainage Layout


11 KAIG3 DD MB P WS 1001 0 L 09.11.19 23.11.19 13.11.19 4 1203 B KAIG3-DWG-MB-P-0003-00 0 1 1
Ground Floor
Site Management & Maintenance Water Services Toilets Layout Ground
12 KAIG3 DD MB P WS 1002 0 L 09.11.19 23.11.19 13.11.19 4 1203 B KAIG3-DWG-MB-P-0003-00 0 1 1
Floor

13 KAIG3 DD MB P WS 8005 0 L Site Management & Maintenance Water Services Schematics 09.11.19 23.11.19 13.11.19 4 1203 B KAIG3-DWG-MB-P-0003-00 0 1 1

14 KAIG3 DD NT P DP 1002 0 L Crescent 1 North Watch Tower Drainage Layout 09.11.19 23.11.19 12.11.19 3 1204 B KAIG3-DWG-NT-P-0004-00 0 1 1

15 KAIG3 DD NT P WS 1001 0 L Crescent 1 North Watch Tower Water Service Layout 09.11.19 23.11.19 12.11.19 3 1204 B KAIG3-DWG-NT-P-0004-00 0 1 1

16 KAIG3 DD WG P DP 1001 0 L Water Garden Water Features Pipe Work A 10.11.19 24.11.19 18.11.19 8 1198 B KAIG3-DWG-WG-P-0006-00 0 1 1

17 KAIG3 DD WG P DP 1002 0 L Water Garden Water Features Pipe Work B 10.11.19 24.11.19 18.11.19 8 1198 B KAIG3-DWG-WG-P-0006-00 0 1 1

18 KAIG3 DD WG P DP 1003 0 L Water Garden Water Features Pipe Work C 10.11.19 24.11.19 18.11.19 8 1198 B KAIG3-DWG-WG-P-0006-00 0 1 1

19 KAIG3 DD WG P DP 1004 0 L Water Garden Water Features Pipe Work D 10.11.19 24.11.19 18.11.19 8 1198 B KAIG3-DWG-WG-P-0006-00 0 1 1

20 KAIG3 DD WG P DP 1005 0 L Water Garden Water Features Pipe Work E 10.11.19 24.11.19 18.11.19 8 1198 B KAIG3-DWG-WG-P-0006-00 0 1 1

21 KAIG3 DD WG P DP 1006 0 L Water Garden Water Features Pipe Work F 10.11.19 24.11.19 18.11.19 8 1198 B KAIG3-DWG-WG-P-0006-00 0 1 1

22 KAIG3 DD WG P DP 1007 0 L Water Garden Water Features Pipe Work G 10.11.19 24.11.19 18.11.19 8 1198 B KAIG3-DWG-WG-P-0006-00 0 1 1

23 KAIG3 DD WG P WS 1014 0 L Decent Sump Section 10.11.19 24.11.19 18.11.19 8 1198 B KAIG3-DWG-WG-P-0006-00 0 1 1

24 KAIG3 DD WG P WS 1012 0 L Wet Well F Plan 10.11.19 24.11.19 18.11.19 8 1198 B KAIG3-DWG-WG-P-0006-00 0 1 1

25 KAIG3 DD WG P WS 2011 0 L Wet Well E Section 10.11.19 24.11.19 18.11.19 8 1198 B KAIG3-DWG-WG-P-0006-00 0 1 1

26 KAIG3 DD WG P WS 2014 0 L Wet Well F Section 10.11.19 24.11.19 18.11.19 8 1198 B KAIG3-DWG-WG-P-0006-00 0 1 1

27 KAIG3 DD WG P WS 8008 0 L Plant Room 2 Water Services Schematics Sheet 1 of 2 10.11.19 24.11.19 18.11.19 8 1198 B KAIG3-DWG-WG-P-0006-00 0 1 1

28 KAIG3 DD WG P WS 8009 0 L Plant Room 2 Water Services Schematics Sheet 2of 2 10.11.19 24.11.19 18.11.19 8 1198 B KAIG3-DWG-WG-P-0006-00 0 1 1

29 KAIG3 DD WG P WS 8010 0 L Plantroom 2 Schedules 10.11.19 24.11.19 18.11.19 8 1198 B KAIG3-DWG-WG-P-0006-00 0 1 1

30 KAIG3 DD NA P DP 1003 0 L Crescent 2 North Administration Low Level Drainage Layout Ground Floor 10.11.19 24.11.19 18.11.19 8 1198 B KAIG3-DWG-NA-P-0005-00 0 1 1

31 KAIG3 DD NA P DP 1004 0 L Crescent 2 North Administration High Level Drainage Layout Ground Floor 10.11.19 24.11.19 18.11.19 8 1198 B KAIG3-DWG-NA-P-0005-00 0 1 1

32 KAIG3 DD NA P DP 1005 0 L Crescent 2 North Administration Low Level Drainage Layout First Floor 10.11.19 24.11.19 18.11.19 8 1198 B KAIG3-DWG-NA-P-0005-00 0 1 1

33 KAIG3 DD NA P WS 1001 0 L Crescent 2 North Administration Water Service Layout Ground Floor 10.11.19 24.11.19 18.11.19 8 1198 B KAIG3-DWG-NA-P-0005-00 0 1 1

34 KAIG3 DD NA P WS 1002 0 L Crescent 2 North Administration Water Service Layout First Floor 10.11.19 24.11.19 18.11.19 8 1198 B KAIG3-DWG-NA-P-0005-00 0 1 1

35 KAIG3 DD NA P WS 8006 0 L Crescent 2 North Administration Water Service Schematic 10.11.19 24.11.19 18.11.19 8 1198 B KAIG3-DWG-NA-P-0005-00 0 1 1

36 KAIG3 DD AG P DP 1003 0 L Site Aviary Garden Low Level Drainage Layout Ground Floor 12.11.19 26.11.19 24.11.19 12 1192 C KAIG3-DWG-AG-P-0007-00 0 Cancelled as per MEP Dept email 1 1

37 KAIG3 DD AG P DP 1004 0 L Site Aviary Garden Low Level Drainage Layout Front of House 12.11.19 26.11.19 24.11.19 12 1192 C KAIG3-DWG-AG-P-0007-00 0 Cancelled as per MEP Dept email 1 1

38 KAIG3 DD AG P DP 1005 0 L Site Aviary Garden Low Level Drainage Layout Back of House 12.11.19 26.11.19 24.11.19 12 1192 C KAIG3-DWG-AG-P-0007-00 0 Cancelled as per MEP Dept email 1 1

39 KAIG3 DD AG P WS 1001 0 L Site Aviary Garden Water Service Layout Ground Floor Sheet 1 of 2 12.11.19 26.11.19 24.11.19 12 1192 C KAIG3-DWG-AG-P-0007-00 0 Cancelled as per MEP Dept email 1 1

40 KAIG3 DD AG P WS 1002 0 L Site Aviary Garden Water Service Layout Ground Floor Sheet 2 of 2 12.11.19 26.11.19 24.11.19 12 1192 C KAIG3-DWG-AG-P-0007-00 0 Cancelled as per MEP Dept email 1 1

41 KAIG3 DD AG P WS 8006 0 L Site Aviary Garden Water Service Schematics 12.11.19 26.11.19 24.11.19 12 1192 C KAIG3-DWG-AG-P-0007-00 0 Cancelled as per MEP Dept email 1 1

42 KAIG3 DD NR P DP 1002 0 L Crescent 1 North Restaurant Low Level Drainage Layout Ground Floor 12.11.19 26.11.19 18.11.19 6 1198 B KAIG3-DWG-NR-P-0008-00 0 1 1

43 KAIG3 DD NR P WS 1001 0 L Crescent 1 North Restaurant Water Services Layout Ground Floor 12.11.19 26.11.19 18.11.19 6 1198 B KAIG3-DWG-NR-P-0008-00 0 1 1

44 KAIG3 DD NR P WS 8003 0 L Crescent 1 North Restaurant Water Services Schematic 12.11.19 26.11.19 18.11.19 6 1198 B KAIG3-DWG-NR-P-0008-00 0 1 1

45 KAIG3 DD FC M DP 1002 0 L Site Security & Fire Control Drainage Layout Ground & Roof floor 18.11.19 02.12.19 20.11.19 2 1196 C KAIG3-DWG-FC-P-0011-00 0 Cancelled as per MEP Dept email 1 1

46 KAIG3 DD FC M WS 1001 0 L Site Security & Fire Control Water Service Layout Ground Floor 18.11.19 02.12.19 20.11.19 2 1196 C KAIG3-DWG-FC-P-0011-00 0 Cancelled as per MEP Dept email 1 1

47 KAIG3 DD FC M DP 1001 0 L Site Butterfly Garden Water Featurres Pipework Services Layout 18.11.19 02.12.19 20.11.19 2 1196 C KAIG3-DWG-TG-P-0012-00 0 Cancelled as per MEP Dept email 1 1

Page 82 of 111 M.Sarfraz


Consultant : DAR

84

46

38
0

0
Cancelled/ Total
Open Code A Code B Code C Code D
Superseded Received Main Contractor : ZHBG

Shop Drawing Submitted

Superseded / Cancelled
0 0 38 0 0 46 84 DESIGN DRAWING SUBMITTAL REGISTER Sub Contractor :
Discipline : Mechanical

For Information
MECHANICAL-PLUMBIBG

Under Review
Rundate: 28-Feb-2023
Drawing Number Number of A B C D

Code A

Code B

Code C

Code D
Approval Average Days Number of
Sl No. Rev. Latest Rev. Description Submitted Date Received Date Days with Submittal Reference Number Rev. Remarks
Crescent OA Promenade & Canopies Undergorund Drainage Layout Required By Outstanding Days Held
48 KAIG3 DD PC M DP 1001 0 L 18.11.19 02.12.19 24.11.19 6 ZHBG
1192 C KAIG3-DWG-PC-P-0010-00 0 Cancelled as per MEP Dept email 1 1
Ground Floor Zone-1
Crescent OA Promenade & Canopies Undergorund Drainage Layout
49 KAIG3 DD PC M DP 1009 0 L 18.11.19 02.12.19 24.11.19 6 1192 C KAIG3-DWG-PC-P-0010-00 0 Cancelled as per MEP Dept email 1 1
Ground Floor Zone-2
Crescent OA Promenade & Canopies Undergorund Drainage Layout
50 KAIG3 DD PC M DP 1010 0 L 18.11.19 02.12.19 24.11.19 6 1192 C KAIG3-DWG-PC-P-0010-00 0 Cancelled as per MEP Dept email 1 1
Ground Floor Zone-3
Crescent OA Promenade & Canopies Undergorund Drainage Layout
51 KAIG3 DD PC M DP 1011 0 L 18.11.19 02.12.19 24.11.19 6 1192 C KAIG3-DWG-PC-P-0010-00 0 Cancelled as per MEP Dept email 1 1
Ground Floor Zone-4
Crescent OA Promenade & Canopies Undergorund Drainage Layout
52 KAIG3 DD PC M DP 1012 0 L 18.11.19 02.12.19 24.11.19 6 1192 C KAIG3-DWG-PC-P-0010-00 0 Cancelled as per MEP Dept email 1 1
Ground Floor Zone-5
Crescent OA Promenade & Canopies North Core Drainage Layout Ground
53 KAIG3 DD PC M DP 1013 0 L 18.11.19 02.12.19 24.11.19 6 1192 C KAIG3-DWG-PC-P-0010-00 0 Cancelled as per MEP Dept email 1 1
Floor
Crescent OA Promenade & Canopies South Core Drainage Layout Ground
54 KAIG3 DD PC M DP 1014 0 L 18.11.19 02.12.19 24.11.19 6 1192 C KAIG3-DWG-PC-P-0010-00 0 Cancelled as per MEP Dept email 1 1
Floor
Crescent OA Promenade & Canopies Incoming Water Supplies Layout
55 KAIG3 DD PC M WS 1001 0 L 18.11.19 02.12.19 24.11.19 6 1192 C KAIG3-DWG-PC-P-0010-00 0 Cancelled as per MEP Dept email 1 1
Ground Floor Zone-1
Crescent OA Promenade & Canopies Incoming Water Supplies Layout
56 KAIG3 DD PC M WS 1002 0 L 18.11.19 02.12.19 24.11.19 6 1192 C KAIG3-DWG-PC-P-0010-00 0 Cancelled as per MEP Dept email 1 1
Ground Floor Zone-2
Crescent OA Promenade & Canopies Incoming Water Supplies Layout
57 KAIG3 DD PC M WS 1003 0 L 18.11.19 02.12.19 24.11.19 6 1192 C KAIG3-DWG-PC-P-0010-00 0 Cancelled as per MEP Dept email 1 1
Ground Floor Zone-3
Crescent OA Promenade & Canopies Incoming Water Supplies Layout
58 KAIG3 DD PC M WS 1004 0 L 18.11.19 02.12.19 24.11.19 6 1192 C KAIG3-DWG-PC-P-0010-00 0 Cancelled as per MEP Dept email 1 1
Ground Floor Zone-4
Crescent OA Promenade & Canopies Incoming Water Supplies Layout
59 KAIG3 DD PC M WS 1005 0 L 18.11.19 02.12.19 24.11.19 6 1192 C KAIG3-DWG-PC-P-0010-00 0 Cancelled as per MEP Dept email 1 1
Ground Floor Zone-5
Crescent OA Promenade & Canopies North Core Water Service Layout
60 KAIG3 DD PC M WS 1006 0 L 18.11.19 02.12.19 24.11.19 6 1192 C KAIG3-DWG-PC-P-0010-00 0 Cancelled as per MEP Dept email 1 1
Ground Floor
Crescent OA Promenade & Canopies South Core Water Service Layout
61 KAIG3 DD PC M WS 1007 0 L 18.11.19 02.12.19 24.11.19 6 1192 C KAIG3-DWG-PC-P-0010-00 0 Cancelled as per MEP Dept email 1 1
Ground Floor

62 KAIG3 DD PC M WS 8015 0 L Crescent OA Promenade & Canopies Water Services Schematics 18.11.19 02.12.19 24.11.19 6 1192 C KAIG3-DWG-PC-P-0010-00 0 Cancelled as per MEP Dept email 1 1

63 KAIG3 DD PC M WS 8016 0 L Crescent OA Promenade & Canopies Water Services Crescent Schematics 18.11.19 02.12.19 24.11.19 6 1192 C KAIG3-DWG-PC-P-0010-00 0 Cancelled as per MEP Dept email 1 1

64 KAIG3 DD PC M WS 8017 0 L Crescent OA Promenade & Canopies Schedule of Equipment 18.11.19 02.12.19 24.11.19 6 1192 C KAIG3-DWG-PC-P-0010-00 0 Cancelled as per MEP Dept email 1 1

65 KAIG3 DD GN M DP 1010 0 L Site Sewerage & Storm Drainage Route - Zone-I 28.11.19 12.12.19 30.11.19 2 1186 C KAIG3-DWG-GN-P-0013-00 0 Cancelled as per MEP Dept email 1 1

66 KAIG3 DD GN M DP 1011 0 L Site Sewerage & Storm Drainage Route - Zone-J 28.11.19 12.12.19 30.11.19 2 1186 C KAIG3-DWG-GN-P-0013-00 0 Cancelled as per MEP Dept email 1 1

67 KAIG3 DD GN M DP 1014 0 L Site Sewerage & Storm Drainage Route - Zone-M 28.11.19 12.12.19 30.11.19 2 1186 C KAIG3-DWG-GN-P-0013-00 0 Cancelled as per MEP Dept email 1 1

68 KAIG3 DD GN M DP 1015 0 L Site Sewerage & Storm Drainage Route - Zone-N 28.11.19 12.12.19 30.11.19 2 1186 C KAIG3-DWG-GN-P-0013-00 0 Cancelled as per MEP Dept email 1 1

69 KAIG3 DD GN M SU 1010 0 L Site Non-Potable Water Distribution Route - Zone I 28.11.19 12.12.19 30.11.19 2 1186 C KAIG3-DWG-GN-P-0013-00 0 Cancelled as per MEP Dept email 1 1

70 KAIG3 DD GN M SU 1011 0 L Site Non-Potable Water Distribution Route - Zone J 28.11.19 12.12.19 30.11.19 2 1186 C KAIG3-DWG-GN-P-0013-00 0 Cancelled as per MEP Dept email 1 1

71 KAIG3 DD GN M SU 1014 0 L Site Non-Potable Water Distribution Route - Zone M 28.11.19 12.12.19 30.11.19 2 1186 C KAIG3-DWG-GN-P-0013-00 0 Cancelled as per MEP Dept email 1 1

72 KAIG3 DD GN M SU 1015 0 L Site Non-Potable Water Distribution Route - Zone N 28.11.19 12.12.19 30.11.19 2 1186 C KAIG3-DWG-GN-P-0013-00 0 Cancelled as per MEP Dept email 1 1

73 KAIG3 DD GN M WS 1010 0 L Site Potable Water Distribution Route -Zone-I 28.11.19 12.12.19 30.11.19 2 1186 C KAIG3-DWG-GN-P-0013-00 0 Cancelled as per MEP Dept email 1 1

74 KAIG3 DD GN M WS 1011 0 L Site Potable Water Distribution Route -Zone-J 28.11.19 12.12.19 30.11.19 2 1186 C KAIG3-DWG-GN-P-0013-00 0 Cancelled as per MEP Dept email 1 1

75 KAIG3 DD GN M WS 1014 0 L Site Potable Water Distribution Route -Zone-M 28.11.19 12.12.19 30.11.19 2 1186 C KAIG3-DWG-GN-P-0013-00 0 Cancelled as per MEP Dept email 1 1

76 KAIG3 DD GN M WS 1015 0 L Site Potable Water Distribution Route -Zone-N 28.11.19 12.12.19 30.11.19 2 1186 C KAIG3-DWG-GN-P-0013-00 0 Cancelled as per MEP Dept email 1 1

77 KAIG3 DD GN G SU 1010 0 L Site Plan Combined Utilities Corridor Distribution Route-Zone I 28.11.19 12.12.19 30.11.19 2 1186 C KAIG3-DWG-GN-P-0014-00 0 Cancelled as per MEP Dept email 1 1

78 KAIG3 DD GN G SU 1011 0 L Site Plan Combined Utilities Corridor Distribution Route-Zone J 28.11.19 12.12.19 30.11.19 2 1186 C KAIG3-DWG-GN-P-0014-00 0 Cancelled as per MEP Dept email 1 1

79 KAIG3 DD GN G SU 1014 0 L Site Plan Combined Utilities Corridor Distribution Route-Zone M 28.11.19 12.12.19 30.11.19 2 1186 C KAIG3-DWG-GN-P-0014-00 0 Cancelled as per MEP Dept email 1 1

80 KAIG3 DD GN G SU 1015 0 L Site Plan Combined Utilities Corridor Distribution Route-Zone N 28.11.19 12.12.19 30.11.19 2 1186 C KAIG3-DWG-GN-P-0014-00 0 Cancelled as per MEP Dept email 1 1

81 KAIG3 DD GN G SU 2018 0 L Site Plan Combined Utilities Sections Zone-I- Sheet 1 of 3 28.11.19 12.12.19 30.11.19 2 1186 C KAIG3-DWG-GN-P-0014-00 0 Cancelled as per MEP Dept email 1 1

82 KAIG3 DD GN G SU 2019 0 L Site Plan Combined Utilities Sections Zone-I- Sheet 2 of 3 28.11.19 12.12.19 30.11.19 2 1186 C KAIG3-DWG-GN-P-0014-00 0 Cancelled as per MEP Dept email 1 1

83 KAIG3 DD GN G SU 2020 0 L Site Plan Combined Utilities Sections Zone-I- Sheet 3 of 3 28.11.19 12.12.19 30.11.19 2 1186 C KAIG3-DWG-GN-P-0014-00 0 Cancelled as per MEP Dept email 1 1

84 KAIG3 DD GN G SU 2021 0 L Site Plan Combined Utilities Sections Zone J 28.11.19 12.12.19 30.11.19 2 1186 C KAIG3-DWG-GN-P-0014-00 0 Cancelled as per MEP Dept email 1 1

85 44985

86 44985

87 44985

88 44985

89 44985

90 44985

91 44985

92 44985

93 44985

94 44985

95 44985

Page 83 of 111 M.Sarfraz


Consultant : DAR

84

46

38
0

0
Cancelled/ Total
Open Code A Code B Code C Code D
Superseded Received Main Contractor : ZHBG

Shop Drawing Submitted

Superseded / Cancelled
0 0 38 0 0 46 84 DESIGN DRAWING SUBMITTAL REGISTER Sub Contractor :
Discipline : Mechanical

For Information
MECHANICAL-PLUMBIBG

Under Review
Rundate: 28-Feb-2023
Drawing Number Number of A B C D

Code A

Code B

Code C

Code D
Approval Average Days Number of
Sl No. Rev. Latest Rev. Description Submitted Date Received Date Days with Submittal Reference Number Rev. Remarks
Required By Outstanding Days Held
96 ZHBG
44985

97 44985

98 44985

99 44985

100 44985

101 44985

102 44985

103 44985

104 44985

105 44985

106 44985

107 44985

108 44985

109 44985

110 44985

111 44985

112 44985

113 44985

114 44985

115 44985

50 44985

51 44985

52 44985

53 44985 44985 0 84 46 0 38 0 0 0 0

54 44985

Page 84 of 111 M.Sarfraz


Consultant : DAR

Cancelled/ Total
Open Code A Code B Code C Code D
Superseded Received
Main Contractor : ZHBG

0 0 0 0 0 0 0
DESGIN DRAWING SUBMITTAL REGISTER (CIVIL) Sub Contractor :
Discipline : Composite Drawing
CIVIL EARTHWORK Rundate: 28-Feb-2023
A B C D
Latest Approval Average Days Number of
Sl No. Drawing Number Rev. Description Submitted Date Received Date Submittal Reference Number Rev. Remarks
Rev. Required By Outstanding Days Held

Prroject Author Type of Nature of Serial Dwg


Building Discplline Sub-Disc Level Area
Name Co. Dwg Dwg No no.

1 13.01.00 44985

2 13.01.00 44985

3 13.01.00 44985

4 13.01.00 44985

5 13.01.00 44985

6 13.01.00 44985

7 13.01.00 44985

8 13.01.00 44985

9 13.01.00 44985

13.01.00 44985

10 13.01.00 44985

13.01.00 44985

11 13.01.00 44985

12 13.01.00 44985

13 13.01.00 44985

14 13.01.00 44985

15 13.01.00 44985

16 13.01.00 44985

17 13.01.00 44985

18 13.01.00 44985

19 13.01.00 44985

20

21

22

23

24

25

26

27

28

29

30

31

31.12.99

Page 85 of 111 M. Sarfraz


Consultant : DAR

Cancelled/ Total
Open Code A Code B Code C Code D
Superseded Received
Main Contractor : ZHBG

0 9 120 125 32 10 296


DESIGN DRAWING SUBMITTAL REGISTER (CIVIL) Sub Contractor :
Discipline : Composite Drawing
CIVIL EARTHWORK Rundate: 28-Feb-2023
Number of A B C D
Latest Approval Average Days Number of
Sl No. Drawing Number Rev. Description Submitted Date Received Date Days with Submittal Reference Number Rev. Remarks
Rev. Required By Outstanding Days Held
ZHBG

Prroject Author Type of Dwg


Building Discplline Sub-Disc
Name Co. Dwg no.
First Submitted on 210420
PSW only due to wrond
1 KAIG3 DD GN C DP 2000 0 L Overall Foul Water plan Sheet 09.05.20 23.05.20 10.05.20 1 1024 D KAIG3-DD-GN-C-0008-00 0
codification and hard copy
First Submitted on 210420
submitted on 090520
PSW only due to wrond
2 KAIG3 DD GN C DP 2001 0 L Foul Water Plan (Sheet 1 of 15) 09.05.20 23.05.20 10.05.20 1 1024 D KAIG3-DD-GN-C-0008-00 0
codification and hard copy
First Submitted on 210420
submitted on 090520
PSW only due to wrond
3 KAIG3 DD GN C DP 2002 0 L Foul Water Plan (Sheet 2 of 15) 09.05.20 23.05.20 10.05.20 1 1024 D KAIG3-DD-GN-C-0008-00 0
codification and hard copy
First Submitted on 210420
submitted on 090520
PSW only due to wrond
4 KAIG3 DD GN C DP 2003 0 L Foul Water Plan (Sheet 3 of 15) 09.05.20 23.05.20 10.05.20 1 1024 D KAIG3-DD-GN-C-0008-00 0
codification and hard copy
First Submitted on 210420
submitted on 090520
PSW only due to wrond
5 KAIG3 DD GN C DP 2004 0 L Foul Water Plan (Sheet 4 of 15) 09.05.20 23.05.20 10.05.20 1 1024 D KAIG3-DD-GN-C-0008-00 0
codification and hard copy
First Submitted on 210420
submitted on 090520
PSW only due to wrond
6 KAIG3 DD GN C DP 2005 0 L Foul Water Plan (Sheet 5 of 15) 09.05.20 23.05.20 10.05.20 1 1024 D KAIG3-DD-GN-C-0008-00 0
codification and hard copy
First Submitted on 210420
submitted on 090520
PSW only due to wrond
7 KAIG3 DD GN C DP 2006 0 L Foul Water Plan (Sheet 6 of 15) 09.05.20 23.05.20 10.05.20 1 1024 D KAIG3-DD-GN-C-0008-00 0
codification and hard copy
First Submitted on 210420
submitted on 090520
PSW only due to wrond
8 KAIG3 DD GN C DP 2007 0 L Foul Water Plan (Sheet 7 of 15) 09.05.20 23.05.20 10.05.20 1 1024 D KAIG3-DD-GN-C-0008-00 0
codification and hard copy
First Submitted on 210420
submitted on 090520
PSW only due to wrond
9 KAIG3 DD GN C DP 2008 0 L Foul Water Plan (Sheet 8 of 15) 09.05.20 23.05.20 10.05.20 1 1024 D KAIG3-DD-GN-C-0008-00 0
codification and hard copy
First Submitted on 210420
submitted on 090520
PSW only due to wrond
10 KAIG3 DD GN C DP 2009 0 L Foul Water Plan (Sheet 9 of 15) 09.05.20 23.05.20 10.05.20 1 1024 D KAIG3-DD-GN-C-0008-00 0
codification and hard copy
First Submitted on 210420
submitted on 090520
PSW only due to wrond
11 KAIG3 DD GN C DP 2010 0 L Foul Water Plan (Sheet 10 of 15) 09.05.20 23.05.20 10.05.20 1 1024 D KAIG3-DD-GN-C-0008-00 0
codification and hard copy
First Submitted on 210420
submitted on 090520
PSW only due to wrond
12 KAIG3 DD GN C DP 2011 0 L Foul Water Plan (Sheet 11 of 15) 09.05.20 23.05.20 10.05.20 1 1024 D KAIG3-DD-GN-C-0008-00 0
codification and hard copy
First Submitted on 210420
submitted on 090520
PSW only due to wrond
13 KAIG3 DD GN C DP 2012 0 L Foul Water Plan (Sheet 12 of 15) 09.05.20 23.05.20 10.05.20 1 1024 D KAIG3-DD-GN-C-0008-00 0
codification and hard copy
First Submitted on 210420
submitted on 090520
PSW only due to wrond
14 KAIG3 DD GN C DP 2013 0 L Foul Water Plan (Sheet 13 of 15) 09.05.20 23.05.20 10.05.20 1 1024 D KAIG3-DD-GN-C-0008-00 0
codification and hard copy
First Submitted on 210420
submitted on 090520
PSW only due to wrond
15 KAIG3 DD GN C DP 2014 0 L Foul Water Plan (Sheet 14 of 15) 09.05.20 23.05.20 10.05.20 1 1024 D KAIG3-DD-GN-C-0008-00 0
codification and hard copy
First Submitted on 210420
submitted on 090520
PSW only due to wrond
16 KAIG3 DD GN C DP 2015 0 L Foul Water Plan (Sheet 15 of 15) 09.05.20 23.05.20 10.05.20 1 1024 D KAIG3-DD-GN-C-0008-00 0
codification and hard copy
submitted on 090520
17 KAIG3 DD GN C DP 1000 0 L Overall Storm Drainage Plan 23.04.20 07.05.20 09.05.20 16 1025 D KAIG3-DD-GN-C-0009-00 0

18 KAIG3 DD GN C DP 1001 0 L Overall Storm Drainage Plan (Sheet 1 of 15) 23.04.20 07.05.20 09.05.20 16 1025 D KAIG3-DD-GN-C-0009-00 0

19 KAIG3 DD GN C DP 1002 0 L Overall Storm Drainage Plan (Sheet 2 of 15) 23.04.20 07.05.20 09.05.20 16 1025 D KAIG3-DD-GN-C-0009-00 0

20 KAIG3 DD GN C DP 1003 0 L Overall Storm Drainage Plan (Sheet 3 of 15) 23.04.20 07.05.20 09.05.20 16 1025 D KAIG3-DD-GN-C-0009-00 0

21 KAIG3 DD GN C DP 1004 0 L Overall Storm Drainage Plan (Sheet 4 of 15) 23.04.20 07.05.20 09.05.20 16 1025 D KAIG3-DD-GN-C-0009-00 0

22 KAIG3 DD GN C DP 1005 0 L Overall Storm Drainage Plan (Sheet 5 of 15) 23.04.20 07.05.20 09.05.20 16 1025 D KAIG3-DD-GN-C-0009-00 0

23 KAIG3 DD GN C DP 1006 0 L Overall Storm Drainage Plan (Sheet 6 of 15) 23.04.20 07.05.20 09.05.20 16 1025 D KAIG3-DD-GN-C-0009-00 0

24 KAIG3 DD GN C DP 1007 0 L Overall Storm Drainage Plan (Sheet 7 of 15) 23.04.20 07.05.20 09.05.20 16 1025 D KAIG3-DD-GN-C-0009-00 0

25 KAIG3 DD GN C DP 1008 0 L Overall Storm Drainage Plan (Sheet 8 of 15) 23.04.20 07.05.20 09.05.20 16 1025 D KAIG3-DD-GN-C-0009-00 0

26 KAIG3 DD GN C DP 1009 0 L Overall Storm Drainage Plan (Sheet 9 of 15) 23.04.20 07.05.20 09.05.20 16 1025 D KAIG3-DD-GN-C-0009-00 0

27 KAIG3 DD GN C DP 1010 0 L Overall Storm Drainage Plan (Sheet 10 of 15) 23.04.20 07.05.20 09.05.20 16 1025 D KAIG3-DD-GN-C-0009-00 0

28 KAIG3 DD GN C DP 1011 0 L Overall Storm Drainage Plan (Sheet 11 of 15) 23.04.20 07.05.20 09.05.20 16 1025 D KAIG3-DD-GN-C-0009-00 0

29 KAIG3 DD GN C DP 1012 0 L Overall Storm Drainage Plan (Sheet 12 of 15) 23.04.20 07.05.20 09.05.20 16 1025 D KAIG3-DD-GN-C-0009-00 0

30 KAIG3 DD GN C DP 1013 0 L Overall Storm Drainage Plan (Sheet 13 of 15) 23.04.20 07.05.20 09.05.20 16 1025 D KAIG3-DD-GN-C-0009-00 0

31 KAIG3 DD GN C DP 1014 0 L Overall Storm Drainage Plan (Sheet 14 of 15) 23.04.20 07.05.20 09.05.20 16 1025 D KAIG3-DD-GN-C-0009-00 0

32 KAIG3 DD GN C DP 1015 0 L Overall Storm Drainage Plan (Sheet 15 of 15) 23.04.20 07.05.20 09.05.20 16 1025 D KAIG3-DD-GN-C-0009-00 0

Cancelled as per MEP


33 KAIG3 DD GN C DP 0021 0 L INDEX OF DRAWINGS 28.05.20 11.06.20 06.06.20 9 997 C KAIG3-DD-GN-C-0012-00 0
Dept Email
OVERALL FOUL WATER PLAN FW NETWORKS UPTO STP (WEST
34 KAIG3 DD GN C DP 1223 0 28.05.20 11.06.20 06.06.20 9 997 C KAIG3-DD-GN-C-0012-00 0
AREA) (SHEET 01 OF 01)
OVERALL FOUL WATER PLAN FW NETWORKS UPTO STP (WEST Submitted on 140720
35 KAIG3 DD GN C DP 1223 1 L 26.07.20 09.08.20 08.08.20 13 934 B KAIG3-DD-GN-C-0012-01 1
AREA) (SHEET 01 OF 01) replaced on 260720
FOUL WATER PLAN FW NETWORKS UPTO STP (WEST AREA)
36 KAIG3 DD GN C DP 1224 0 28.05.20 11.06.20 06.06.20 9 997 C KAIG3-DD-GN-C-0012-00 0
(SHEET 1 OF 4)
FOUL WATER PLAN FW NETWORKS UPTO STP (WEST AREA) Submitted on 140720
37 KAIG3 DD GN C DP 1224 1 L 26.07.20 09.08.20 08.08.20 13 934 B KAIG3-DD-GN-C-0012-01 1
(SHEET 1 OF 4) replaced on 260720
FOUL WATER PLAN FW NETWORKS UPTO STP (WEST AREA)
38 KAIG3 DD GN C DP 1225 0 28.05.20 11.06.20 06.06.20 9 997 C KAIG3-DD-GN-C-0012-00 0
(SHEET 2 OF 4)
FOUL WATER PLAN FW NETWORKS UPTO STP (WEST AREA) Submitted on 140720
39 KAIG3 DD GN C DP 1225 1 L 26.07.20 09.08.20 08.08.20 13 934 B KAIG3-DD-GN-C-0012-01 1
(SHEET 2 OF 4) replaced on 260720
FOUL WATER PLAN FW NETWORKS UPTO STP (WEST AREA)
40 KAIG3 DD GN C DP 1226 0 28.05.20 11.06.20 06.06.20 9 997 C KAIG3-DD-GN-C-0012-00 0
(SHEET 3 OF 4)
FOUL WATER PLAN FW NETWORKS UPTO STP (WEST AREA) Submitted on 140720
41 KAIG3 DD GN C DP 1226 1 L 26.07.20 09.08.20 08.08.20 13 934 B KAIG3-DD-GN-C-0012-01 1
(SHEET 3 OF 4) replaced on 260720

Page 86 of 111 M. Sarfraz


Consultant : DAR

Cancelled/ Total
Open Code A Code B Code C Code D
Superseded Received
Main Contractor : ZHBG

0 9 120 125 32 10 296


DESIGN DRAWING SUBMITTAL REGISTER (CIVIL) Sub Contractor :
Discipline : Composite Drawing
CIVIL EARTHWORK Rundate: 28-Feb-2023
Number of A B C D
Latest Approval Average Days Number of
Sl No. Drawing Number Rev. Description Submitted Date Received Date Days with Submittal Reference Number Rev. Remarks
Rev. FOUL WATER PLAN FW NETWORKS UPTO STP (WEST AREA) Required By Outstanding Days Held
ZHBG
42 KAIG3 DD GN C DP 1227 0 28.05.20 11.06.20 06.06.20 9 997 C KAIG3-DD-GN-C-0012-00 0
(SHEET 4 OF 4)
FOUL WATER PLAN FW NETWORKS UPTO STP (WEST AREA) Submitted on 140720
43 KAIG3 DD GN C DP 1227 1 L 26.07.20 09.08.20 08.08.20 13 934 B KAIG3-DD-GN-C-0012-01 1
(SHEET 4 OF 4) replaced on 260720

44 KAIG3 DD GN C DP 1228 0 FOUL WATER PROFILE (SHEET 01 OF 01) 28.05.20 11.06.20 06.06.20 9 997 C KAIG3-DD-GN-C-0012-00 0

Submitted on 140720
45 KAIG3 DD GN C DP 1228 1 L FOUL WATER PROFILE (SHEET 01 OF 01) 26.07.20 09.08.20 08.08.20 13 934 B KAIG3-DD-GN-C-0012-01 1
replaced on 260720

46 KAIG3 DD GN C DP 1229 0 FOUL WATER MANHOLE SCHEDULE (SHEET 01 OF 01) 28.05.20 11.06.20 06.06.20 9 997 C KAIG3-DD-GN-C-0012-00 0

Submitted on 140720
47 KAIG3 DD GN C DP 1229 1 L FOUL WATER MANHOLE SCHEDULE (SHEET 01 OF 01) 26.07.20 09.08.20 08.08.20 13 934 B KAIG3-DD-GN-C-0012-01 1
replaced on 260720

48 KAIG3 DD GN C DP 1330 0 TYPICAL GENERAL DETAILS (SHEET 01 OF 01) 28.05.20 11.06.20 06.06.20 9 997 C KAIG3-DD-GN-C-0012-00 0

Submitted on 140720
49 KAIG3 DD GN C DP 1330 1 L TYPICAL GENERAL DETAILS (SHEET 01 OF 01) 26.07.20 09.08.20 08.08.20 13 934 B KAIG3-DD-GN-C-0012-01 1
replaced on 260720
Cancelled as per MEP
50 KAIG3 DD GN C DP 004 0 L Index of Drawings Zone-3 30.05.20 13.06.20 13.06.20 14 990 C KAIG3-DD-GN-C-0015-00 0
Dept Email

51 KAIG3 DD GN C DP 1042 0 Overall Storm Drainage Plan Zone-3 30.05.20 13.06.20 13.06.20 14 990 C KAIG3-DD-GN-C-0015-00 0

52 KAIG3 DD GN C DP 1042 1 L Overall Storm Drainage Plan Zone-3 29.06.20 13.07.20 05.07.20 6 968 B KAIG3-DD-GN-C-0015-01 1

53 KAIG3 DD GN C DP 1043 0 Storm Water Drainage Plan Zone-3 (Sheet 1 of 7) 30.05.20 13.06.20 13.06.20 14 990 C KAIG3-DD-GN-C-0015-00 0

54 KAIG3 DD GN C DP 1043 1 L Storm Water Drainage Plan Zone-3 (Sheet 1 of 7) 29.06.20 13.07.20 05.07.20 6 968 B KAIG3-DD-GN-C-0015-01 1

55 KAIG3 DD GN C DP 1044 0 Storm Water Drainage Plan Zone-3 (Sheet 2 of 7) 30.05.20 13.06.20 13.06.20 14 990 C KAIG3-DD-GN-C-0015-00 0

56 KAIG3 DD GN C DP 1044 1 L Storm Water Drainage Plan Zone-3 (Sheet 2 of 7) 29.06.20 13.07.20 05.07.20 6 968 B KAIG3-DD-GN-C-0015-01 1

57 KAIG3 DD GN C DP 1045 0 Storm Water Drainage Plan Zone-3 (Sheet 3 of 7) 30.05.20 13.06.20 13.06.20 14 990 C KAIG3-DD-GN-C-0015-00 0

58 KAIG3 DD GN C DP 1045 1 L Storm Water Drainage Plan Zone-3 (Sheet 3 of 7) 29.06.20 13.07.20 05.07.20 6 968 B KAIG3-DD-GN-C-0015-01 1

59 KAIG3 DD GN C DP 1046 0 Storm Water Drainage Plan Zone-3 (Sheet 4 of 7) 30.05.20 13.06.20 13.06.20 14 990 C KAIG3-DD-GN-C-0015-00 0

60 KAIG3 DD GN C DP 1046 1 L Storm Water Drainage Plan Zone-3 (Sheet 4 of 7) 29.06.20 13.07.20 05.07.20 6 968 B KAIG3-DD-GN-C-0015-01 1

61 KAIG3 DD GN C DP 1047 0 Storm Water Drainage Plan Zone-3 (Sheet 5 of 7) 30.05.20 13.06.20 13.06.20 14 990 C KAIG3-DD-GN-C-0015-00 0

62 KAIG3 DD GN C DP 1047 1 L Storm Water Drainage Plan Zone-3 (Sheet 5 of 7) 29.06.20 13.07.20 05.07.20 6 968 B KAIG3-DD-GN-C-0015-01 1

63 KAIG3 DD GN C DP 1048 0 Storm Water Drainage Plan Zone-3 (Sheet 6 of 7) 30.05.20 13.06.20 13.06.20 14 990 C KAIG3-DD-GN-C-0015-00 0

64 KAIG3 DD GN C DP 1048 1 L Storm Water Drainage Plan Zone-3 (Sheet 6 of 7) 29.06.20 13.07.20 05.07.20 6 968 B KAIG3-DD-GN-C-0015-01 1

65 KAIG3 DD GN C DP 1049 0 Storm Water Drainage Plan Zone-3 (Sheet 7 of 7) 30.05.20 13.06.20 13.06.20 14 990 C KAIG3-DD-GN-C-0015-00 0

66 KAIG3 DD GN C DP 1049 1 L Storm Water Drainage Plan Zone-3 (Sheet 7 of 7) 29.06.20 13.07.20 05.07.20 6 968 B KAIG3-DD-GN-C-0015-01 1

67 KAIG3 DD GN C DP 1050 0 Storm Drainage Profile Zone-3 30.05.20 13.06.20 13.06.20 14 990 C KAIG3-DD-GN-C-0015-00 0

68 KAIG3 DD GN C DP 1050 1 L Storm Drainage Profile Zone-3 29.06.20 13.07.20 05.07.20 6 968 B KAIG3-DD-GN-C-0015-01 1

69 KAIG3 DD GN C DP 1051 0 Storm Drainage Manhole and Gully Schedule Zone 03 30.05.20 13.06.20 13.06.20 14 990 C KAIG3-DD-GN-C-0015-00 0

70 KAIG3 DD GN C DP 1051 1 L Storm Drainage Manhole and Gully Schedule Zone 03 29.06.20 13.07.20 05.07.20 6 968 B KAIG3-DD-GN-C-0015-01 1

71 KAIG3 DD GN C DP 1052 0 Utilities Cross Section Zone 03 30.05.20 13.06.20 13.06.20 14 990 C KAIG3-DD-GN-C-0015-00 0

72 KAIG3 DD GN C DP 1052 1 L Utilities Cross Section Zone 03 29.06.20 13.07.20 05.07.20 6 968 B KAIG3-DD-GN-C-0015-01 1

73 KAIG3 DD GN C DP 1016 0 Overall Storm Drainage Plan Zone-1 31.05.20 14.06.20 11.06.20 11 992 C KAIG3-DD-GN-C-0014-00 0

74 KAIG3 DD GN C DP 1016 1 L Overall Storm Drainage Plan Zone-1 23.06.20 07.07.20 30.06.20 7 973 B KAIG3-DD-GN-C-0014-01 1

75 KAIG3 DD GN C DP 1017 0 Storm Water Drainage Plan Zone-1 (Sheet 1 of 4) 31.05.20 14.06.20 11.06.20 11 992 C KAIG3-DD-GN-C-0014-00 0

76 KAIG3 DD GN C DP 1017 1 L Storm Water Drainage Plan Zone-1 (Sheet 1 of 4) 23.06.20 07.07.20 30.06.20 7 973 B KAIG3-DD-GN-C-0014-01 1

77 KAIG3 DD GN C DP 1018 0 Storm Water Drainage Plan Zone-1 (Sheet 2 of 4) 31.05.20 14.06.20 11.06.20 11 992 C KAIG3-DD-GN-C-0014-00 0

Cancelled as per MEP


78 KAIG3 DD GN C DP 1018 1 L Storm Water Drainage Plan Zone-1 (Sheet 2 of 4) 23.06.20 07.07.20 30.06.20 7 973 C KAIG3-DD-GN-C-0014-01 1
Dept Email

79 KAIG3 DD GN C DP 1019 0 Storm Water Drainage Plan Zone-1 (Sheet 3 of 4) 31.05.20 14.06.20 11.06.20 11 992 C KAIG3-DD-GN-C-0014-00 0

80 KAIG3 DD GN C DP 1019 1 L Storm Water Drainage Plan Zone-1 (Sheet 3 of 4) 23.06.20 07.07.20 30.06.20 7 973 B KAIG3-DD-GN-C-0014-01 1

81 KAIG3 DD GN C DP 1020 0 Storm Water Drainage Plan Zone-1 (Sheet 4 of 4) 31.05.20 14.06.20 11.06.20 11 992 C KAIG3-DD-GN-C-0014-00 0

Cancelled as per MEP


82 KAIG3 DD GN C DP 1020 1 L Storm Water Drainage Plan Zone-1 (Sheet 4 of 4) 23.06.20 07.07.20 30.06.20 7 973 C KAIG3-DD-GN-C-0014-01 1
Dept Email

83 KAIG3 DD GN C DP 1021 0 Storm Box Culvert and Open Channel Detials Zone-1 31.05.20 14.06.20 11.06.20 11 992 C KAIG3-DD-GN-C-0014-00 0

Cancelled as per MEP


84 KAIG3 DD GN C DP 1021 1 L Storm Box Culvert and Open Channel Detials Zone-1 23.06.20 07.07.20 30.06.20 7 973 C KAIG3-DD-GN-C-0014-01 1
Dept Email

Page 87 of 111 M. Sarfraz


Consultant : DAR

Cancelled/ Total
Open Code A Code B Code C Code D
Superseded Received
Main Contractor : ZHBG

0 9 120 125 32 10 296


DESIGN DRAWING SUBMITTAL REGISTER (CIVIL) Sub Contractor :
Discipline : Composite Drawing
CIVIL EARTHWORK Rundate: 28-Feb-2023
Number of A B C D
Latest Approval Average Days Number of
Sl No. Drawing Number Rev. Description Submitted Date Received Date Days with Submittal Reference Number Rev. Remarks
Rev. Required By Outstanding Days Held
ZHBG
85 KAIG3 DD GN C DP 1022 0 Storm Typical Manhole Detials Zone-1 31.05.20 14.06.20 11.06.20 11 992 C KAIG3-DD-GN-C-0014-00 0

86 KAIG3 DD GN C DP 1022 1 L Storm Typical Manhole Detials Zone-1 23.06.20 07.07.20 30.06.20 7 973 B KAIG3-DD-GN-C-0014-01 1

87 KAIG3 DD GN C DP 1023 0 Typical Catch Basis Precast Elements Detials Zone-1 31.05.20 14.06.20 11.06.20 11 992 C KAIG3-DD-GN-C-0014-00 0

88 KAIG3 DD GN C DP 1023 1 L Typical Catch Basis Precast Elements Detials Zone-1 23.06.20 07.07.20 30.06.20 7 973 B KAIG3-DD-GN-C-0014-01 1

89 KAIG3 DD GN C DP 1024 0 Storm Drainage Profile Zone-1 31.05.20 14.06.20 11.06.20 11 992 C KAIG3-DD-GN-C-0014-00 0

90 KAIG3 DD GN C DP 1024 1 L Storm Drainage Profile Zone-1 23.06.20 07.07.20 30.06.20 7 973 B KAIG3-DD-GN-C-0014-01 1

91 KAIG3 DD GN C DP 8024 0 Storm Drainage manhole and Gully Schedule Zone-1 31.05.20 14.06.20 11.06.20 11 992 C KAIG3-DD-GN-C-0014-00 0

92 KAIG3 DD GN C DP 8024 1 L Storm Drainage manhole and Gully Schedule Zone-1 23.06.20 07.07.20 30.06.20 7 973 B KAIG3-DD-GN-C-0014-01 1

93 KAIG3 DD GN C DP 1025 0 Overall Storm Drainage Plan Zone 02 01.06.20 15.06.20 11.06.20 10 992 C KAIG3-DD-GN-C-0013-00 0

94 KAIG3 DD GN C DP 1025 1 L Overall Storm Drainage Plan Zone 02 28.06.20 12.07.20 02.07.20 4 B 971 B KAIG3-DD-GN-C-0013-01 1

95 KAIG3 DD GN C DP 1026 0 Storm Water Drainage Plan Zone 02 (Sheet 1 of 8) 01.06.20 15.06.20 11.06.20 10 992 C KAIG3-DD-GN-C-0013-00 0

96 KAIG3 DD GN C DP 1026 1 L Storm Water Drainage Plan Zone 02 (Sheet 1 of 8) 28.06.20 12.07.20 02.07.20 4 971 B KAIG3-DD-GN-C-0013-01 1

97 KAIG3 DD GN C DP 1027 0 Storm Water Drainage Plan Zone 02 (Sheet 2 of 8) 01.06.20 15.06.20 11.06.20 10 992 C KAIG3-DD-GN-C-0013-00 0

98 KAIG3 DD GN C DP 1027 1 L Storm Water Drainage Plan Zone 02 (Sheet 2 of 8) 28.06.20 12.07.20 02.07.20 4 971 B KAIG3-DD-GN-C-0013-01 1

99 KAIG3 DD GN C DP 1028 0 Storm Water Drainage Plan Zone 02 (Sheet 3 of 8) 01.06.20 15.06.20 11.06.20 10 992 C KAIG3-DD-GN-C-0013-00 0

100 KAIG3 DD GN C DP 1028 1 L Storm Water Drainage Plan Zone 02 (Sheet 3 of 8) 28.06.20 12.07.20 02.07.20 4 971 B KAIG3-DD-GN-C-0013-01 1

101 KAIG3 DD GN C DP 1029 0 Storm Water Drainage Plan Zone 02 (Sheet 4 of 8) 01.06.20 15.06.20 11.06.20 10 992 C KAIG3-DD-GN-C-0013-00 0

102 KAIG3 DD GN C DP 1029 1 L Storm Water Drainage Plan Zone 02 (Sheet 4 of 8) 28.06.20 12.07.20 02.07.20 4 971 B KAIG3-DD-GN-C-0013-01 1

103 KAIG3 DD GN C DP 1030 0 Storm Water Drainage Plan Zone 02 (Sheet 5 of 8) 01.06.20 15.06.20 11.06.20 10 992 C KAIG3-DD-GN-C-0013-00 0

Cancelled as per MEP


104 KAIG3 DD GN C DP 1030 1 L Storm Water Drainage Plan Zone 02 (Sheet 5 of 8) 28.06.20 12.07.20 02.07.20 4 971 C KAIG3-DD-GN-C-0013-01 1
Dept Email

105 KAIG3 DD GN C DP 1031 0 Storm Water Drainage Plan Zone 02 (Sheet 6 of 8) 01.06.20 15.06.20 11.06.20 10 992 C KAIG3-DD-GN-C-0013-00 0

Cancelled as per MEP


106 KAIG3 DD GN C DP 1031 1 L Storm Water Drainage Plan Zone 02 (Sheet 6 of 8) 28.06.20 12.07.20 02.07.20 4 971 C KAIG3-DD-GN-C-0013-01 1
Dept Email

107 KAIG3 DD GN C DP 1032 0 Storm Water Drainage Plan Zone 02 (Sheet 7 of 8) 01.06.20 15.06.20 11.06.20 10 992 C KAIG3-DD-GN-C-0013-00 0

Cancelled as per MEP


108 KAIG3 DD GN C DP 1032 1 L Storm Water Drainage Plan Zone 02 (Sheet 7 of 8) 28.06.20 12.07.20 02.07.20 4 971 C KAIG3-DD-GN-C-0013-01 1
Dept Email

109 KAIG3 DD GN C DP 1033 0 Storm Water Drainage Plan Zone 02 (Sheet 8 of 8) 01.06.20 15.06.20 11.06.20 10 992 C KAIG3-DD-GN-C-0013-00 0

Cancelled as per MEP


110 KAIG3 DD GN C DP 1033 1 L Storm Water Drainage Plan Zone 02 (Sheet 8 of 8) 28.06.20 12.07.20 02.07.20 4 971 C KAIG3-DD-GN-C-0013-01 1
Dept Email

111 KAIG3 DD GN C DP 1040 0 Storm Draiange Profile Zone 02 S(Sheet 1 of 2) 01.06.20 15.06.20 11.06.20 10 992 C KAIG3-DD-GN-C-0013-00 0

112 KAIG3 DD GN C DP 1040 1 L Storm Draiange Profile Zone 02 S(Sheet 1 of 2) 28.06.20 12.07.20 02.07.20 4 971 B KAIG3-DD-GN-C-0013-01 1

113 KAIG3 DD GN C DP 1041 0 Storm Draiange Profile Zone 02 S(Sheet 2 of 2) 01.06.20 15.06.20 11.06.20 10 992 C KAIG3-DD-GN-C-0013-00 0

Cancelled as per MEP


114 KAIG3 DD GN C DP 1041 1 L Storm Draiange Profile Zone 02 S(Sheet 2 of 2) 28.06.20 12.07.20 02.07.20 4 971 C KAIG3-DD-GN-C-0013-01 1
Dept Email

115 KAIG3 DD GN C DP 2039 0 Utilites Cross Section Zone-02 01.06.20 15.06.20 11.06.20 10 992 C KAIG3-DD-GN-C-0013-00 0

116 KAIG3 DD GN C DP 2039 1 L Utilites Cross Section Zone-02 28.06.20 12.07.20 02.07.20 4 971 B KAIG3-DD-GN-C-0013-01 1

117 KAIG3 DD GN C DP 8034 0 Storm Drainage Manhole and Fully Schedule Zone 02 01.06.20 15.06.20 11.06.20 10 992 C KAIG3-DD-GN-C-0013-00 0

118 KAIG3 DD GN C DP 8034 1 L Storm Drainage Manhole and Fully Schedule Zone 02 28.06.20 12.07.20 02.07.20 4 971 B KAIG3-DD-GN-C-0013-01 1

119 KAIG3 DD GN C DP 1231 0 Overall Foul Water Plan (FW Network Upto PS ) (Sheet 01 of 01) 03.06.20 17.06.20 16.06.20 13 987 C KAIG3-DD-GN-C-0016-00 0
Submitted on 080820
withdraw on
120 KAIG3 DD GN C DP 1231 1 Overall Foul Water Plan (FW Network Upto PS ) (Sheet 01 of 01) 17.08.20 31.08.20 24.08.20 7 918 C KAIG3-DD-GN-C-0016-01 1
120820/resubmitted on
170820
121 KAIG3 DD GN C DP 1231 2 L Overall Foul Water Plan (FW Network Upto PS ) (Sheet 01 of 01) 14.02.21 28.02.21 21.02.21 7 737 B KAIG3-DD-GN-C-0016-02 2

122 KAIG3 DD GN C DP 1232 0 Foul Water Plan (FW Network Upto PS Sheet 01 of 11) 03.06.20 17.06.20 16.06.20 13 987 C KAIG3-DD-GN-C-0016-00 0
Submitted on 080820
withdraw on
123 KAIG3 DD GN C DP 1232 1 Foul Water Plan (FW Network Upto PS Sheet 01 of 11) 17.08.20 31.08.20 24.08.20 7 918 C KAIG3-DD-GN-C-0016-01 1
120820/resubmitted on
170820
124 KAIG3 DD GN C DP 1232 2 L Foul Water Plan (FW Network Upto PS Sheet 01 of 11) 14.02.21 28.02.21 21.02.21 7 737 B KAIG3-DD-GN-C-0016-02 2

125 KAIG3 DD GN C DP 1233 0 Foul Water Plan (FW Network Upto PS Sheet 02 of 11) 03.06.20 17.06.20 16.06.20 13 987 C KAIG3-DD-GN-C-0016-00 0
Submitted on 080820
withdraw on
126 KAIG3 DD GN C DP 1233 1 Foul Water Plan (FW Network Upto PS Sheet 02 of 11) 17.08.20 31.08.20 24.08.20 7 918 C KAIG3-DD-GN-C-0016-01 1
120820/resubmitted on
170820
127 KAIG3 DD GN C DP 1233 2 L Foul Water Plan (FW Network Upto PS Sheet 02 of 11) 14.02.21 28.02.21 21.02.21 7 737 B KAIG3-DD-GN-C-0016-02 2

Page 88 of 111 M. Sarfraz


Consultant : DAR

Cancelled/ Total
Open Code A Code B Code C Code D
Superseded Received
Main Contractor : ZHBG

0 9 120 125 32 10 296


DESIGN DRAWING SUBMITTAL REGISTER (CIVIL) Sub Contractor :
Discipline : Composite Drawing
CIVIL EARTHWORK Rundate: 28-Feb-2023
Number of A B C D
Latest Approval Average Days Number of
Sl No. Drawing Number Rev. Description Submitted Date Received Date Days with Submittal Reference Number Rev. Remarks
Rev. Required By Outstanding Days Held
ZHBG
128 KAIG3 DD GN C DP 1234 0 Foul Water Plan (FW Network Upto PS Sheet 03 of 11) 03.06.20 17.06.20 16.06.20 13 987 C KAIG3-DD-GN-C-0016-00 0
Submitted on 080820
withdraw on
129 KAIG3 DD GN C DP 1234 1 Foul Water Plan (FW Network Upto PS Sheet 03 of 11) 17.08.20 31.08.20 24.08.20 7 918 C KAIG3-DD-GN-C-0016-01 1
120820/resubmitted on
170820
130 KAIG3 DD GN C DP 1234 2 L Foul Water Plan (FW Network Upto PS Sheet 03 of 11) 14.02.21 28.02.21 21.02.21 7 737 B KAIG3-DD-GN-C-0016-02 2

131 KAIG3 DD GN C DP 1235 0 Foul Water Plan (FW Network Upto PS Sheet 04 of 11) 03.06.20 17.06.20 16.06.20 13 987 C KAIG3-DD-GN-C-0016-00 0
Submitted on 080820
withdraw on
132 KAIG3 DD GN C DP 1235 1 Foul Water Plan (FW Network Upto PS Sheet 04 of 11) 17.08.20 31.08.20 24.08.20 7 918 C KAIG3-DD-GN-C-0016-01 1
120820/resubmitted on
170820
133 KAIG3 DD GN C DP 1235 2 L Foul Water Plan (FW Network Upto PS Sheet 04 of 11) 14.02.21 28.02.21 21.02.21 7 737 B KAIG3-DD-GN-C-0016-02 2

134 KAIG3 DD GN C DP 1236 0 Foul Water Plan (FW Network Upto PS Sheet 05 of 11) 03.06.20 17.06.20 16.06.20 13 987 C KAIG3-DD-GN-C-0016-00 0
Submitted on 080820
withdraw on
135 KAIG3 DD GN C DP 1236 1 Foul Water Plan (FW Network Upto PS Sheet 05 of 11) 17.08.20 31.08.20 24.08.20 7 918 C KAIG3-DD-GN-C-0016-01 1
120820/resubmitted on
170820
136 KAIG3 DD GN C DP 1236 2 L Foul Water Plan (FW Network Upto PS Sheet 05 of 11) 14.02.21 28.02.21 21.02.21 7 737 B KAIG3-DD-GN-C-0016-02 2

137 KAIG3 DD GN C DP 1237 0 Foul Water Plan (FW Network Upto PS Sheet 06 of 11) 03.06.20 17.06.20 16.06.20 13 987 C KAIG3-DD-GN-C-0016-00 0
Submitted on 080820
withdraw on
138 KAIG3 DD GN C DP 1237 1 Foul Water Plan (FW Network Upto PS Sheet 06 of 11) 17.08.20 31.08.20 24.08.20 7 918 C KAIG3-DD-GN-C-0016-01 1
120820/resubmitted on
170820
139 KAIG3 DD GN C DP 1237 2 L Foul Water Plan (FW Network Upto PS Sheet 06 of 11) 14.02.21 28.02.21 21.02.21 7 737 B KAIG3-DD-GN-C-0016-02 2

140 KAIG3 DD GN C DP 1238 0 Foul Water Plan (FW Network Upto PS Sheet 07 of 11) 03.06.20 17.06.20 16.06.20 13 987 C KAIG3-DD-GN-C-0016-00 0
Submitted on 080820
withdraw on
141 KAIG3 DD GN C DP 1238 1 Foul Water Plan (FW Network Upto PS Sheet 07 of 11) 17.08.20 31.08.20 24.08.20 7 918 C KAIG3-DD-GN-C-0016-01 1
120820/resubmitted on
170820
142 KAIG3 DD GN C DP 1238 2 L Foul Water Plan (FW Network Upto PS Sheet 07 of 11) 14.02.21 28.02.21 21.02.21 7 737 B KAIG3-DD-GN-C-0016-02 2

143 KAIG3 DD GN C DP 1239 0 Foul Water Plan (FW Network Upto PS Sheet 08 of 11) 03.06.20 17.06.20 16.06.20 13 987 C KAIG3-DD-GN-C-0016-00 0
Submitted on 080820
withdraw on
144 KAIG3 DD GN C DP 1239 1 Foul Water Plan (FW Network Upto PS Sheet 08 of 11) 17.08.20 31.08.20 24.08.20 7 918 C KAIG3-DD-GN-C-0016-01 1
120820/resubmitted on
170820
145 KAIG3 DD GN C DP 1239 2 L Foul Water Plan (FW Network Upto PS Sheet 08 of 11) 14.02.21 28.02.21 21.02.21 7 737 B KAIG3-DD-GN-C-0016-02 2

146 KAIG3 DD GN C DP 1240 0 Foul Water Plan (FW Network Upto PS Sheet 09 of 11) 03.06.20 17.06.20 16.06.20 13 987 C KAIG3-DD-GN-C-0016-00 0
Submitted on 080820
withdraw on
147 KAIG3 DD GN C DP 1240 1 Foul Water Plan (FW Network Upto PS Sheet 09 of 11) 17.08.20 31.08.20 24.08.20 7 918 C KAIG3-DD-GN-C-0016-01 1
120820/resubmitted on
170820
148 KAIG3 DD GN C DP 1240 2 L Foul Water Plan (FW Network Upto PS Sheet 09 of 11) 14.02.21 28.02.21 21.02.21 7 737 B KAIG3-DD-GN-C-0016-02 2

149 KAIG3 DD GN C DP 1241 0 Foul Water Plan (FW Network Upto PS Sheet 10 of 11) 03.06.20 17.06.20 16.06.20 13 987 C KAIG3-DD-GN-C-0016-00 0
Submitted on 080820
withdraw on
150 KAIG3 DD GN C DP 1241 1 Foul Water Plan (FW Network Upto PS Sheet 10 of 11) 17.08.20 31.08.20 24.08.20 7 918 C KAIG3-DD-GN-C-0016-01 1
120820/resubmitted on
170820
151 KAIG3 DD GN C DP 1241 2 L Foul Water Plan (FW Network Upto PS Sheet 10 of 11) 14.02.21 28.02.21 21.02.21 7 737 B KAIG3-DD-GN-C-0016-02 2

152 KAIG3 DD GN C DP 1242 0 Foul Water Plan (FW Network Upto PS Sheet 11 of 11) 03.06.20 17.06.20 16.06.20 13 987 C KAIG3-DD-GN-C-0016-00 0
Submitted on 080820
withdraw on
153 KAIG3 DD GN C DP 1242 1 Foul Water Plan (FW Network Upto PS Sheet 11 of 11) 17.08.20 31.08.20 24.08.20 7 918 C KAIG3-DD-GN-C-0016-01 1
120820/resubmitted on
170820
154 KAIG3 DD GN C DP 1242 2 L Foul Water Plan (FW Network Upto PS Sheet 11 of 11) 14.02.21 28.02.21 21.02.21 7 737 B KAIG3-DD-GN-C-0016-02 2

155 KAIG3 DD GN C DP 1243 0 Foul Water Profile (FW Netowrk Utp PS) Sheet 01 of 02 03.06.20 17.06.20 16.06.20 13 987 C KAIG3-DD-GN-C-0016-00 0
Submitted on 080820
withdraw on
156 KAIG3 DD GN C DP 1243 1 Foul Water Profile (FW Netowrk Utp PS) Sheet 01 of 02 17.08.20 31.08.20 24.08.20 7 918 C KAIG3-DD-GN-C-0016-01 1
120820/resubmitted on
170820
157 KAIG3 DD GN C DP 1243 2 L Foul Water Profile (FW Netowrk Utp PS) Sheet 01 of 02 14.02.21 28.02.21 21.02.21 7 737 B KAIG3-DD-GN-C-0016-02 2

158 KAIG3 DD GN C DP 1244 0 Foul Water Profile (FW Netowrk Utp PS) Sheet 02 of 02 03.06.20 17.06.20 16.06.20 13 987 C KAIG3-DD-GN-C-0016-00 0
Submitted on 080820
withdraw on
159 KAIG3 DD GN C DP 1244 1 Foul Water Profile (FW Netowrk Utp PS) Sheet 02 of 02 17.08.20 31.08.20 24.08.20 7 918 C KAIG3-DD-GN-C-0016-01 1
120820/resubmitted on
170820
160 KAIG3 DD GN C DP 1244 2 L Foul Water Profile (FW Netowrk Utp PS) Sheet 02 of 02 14.02.21 28.02.21 21.02.21 7 737 B KAIG3-DD-GN-C-0016-02 2

161 KAIG3 DD GN C DP 8080 0 Foul Water Manholes Schedule (FW Network Upto PS) Sheet 01 of 01 03.06.20 17.06.20 16.06.20 13 987 C KAIG3-DD-GN-C-0016-00 0
Submitted on 080820
withdraw on
162 KAIG3 DD GN C DP 8080 1 Foul Water Manholes Schedule (FW Network Upto PS) Sheet 01 of 01 17.08.20 31.08.20 24.08.20 7 918 C KAIG3-DD-GN-C-0016-01 1
120820/resubmitted on
170820
163 KAIG3 DD GN C DP 8080 2 L Foul Water Manholes Schedule (FW Network Upto PS) Sheet 01 of 01 14.02.21 28.02.21 21.02.21 7 737 B KAIG3-DD-GN-C-0016-02 2

164 KAIG3 DD GN C DP 1216 0 L Overall Foul Water Plan (FW Network Upto Cesspool (Sheet 01 of 01) 06.06.20 20.06.20 18.06.20 12 985 B KAIG3-DD-GN-C-0017-00 0

165 KAIG3 DD GN C DP 1217 0 L Foul Water Plan FW Network Upto Cesspopl (Sheet 01 of 05) 06.06.20 20.06.20 18.06.20 12 985 B KAIG3-DD-GN-C-0017-00 0

166 KAIG3 DD GN C DP 1218 0 L Foul Water Plan FW Network Upto Cesspopl (Sheet 02 of 05) 06.06.20 20.06.20 18.06.20 12 985 B KAIG3-DD-GN-C-0017-00 0

167 KAIG3 DD GN C DP 1219 0 L Foul Water Plan FW Network Upto Cesspopl (Sheet 03 of 05) 06.06.20 20.06.20 18.06.20 12 985 B KAIG3-DD-GN-C-0017-00 0

168 KAIG3 DD GN C DP 1220 0 L Foul Water Plan FW Network Upto Cesspopl (Sheet 04 of 05) 06.06.20 20.06.20 18.06.20 12 985 B KAIG3-DD-GN-C-0017-00 0

169 KAIG3 DD GN C DP 1221 0 L Foul Water Plan FW Network Upto Cesspopl (Sheet 05 of 05) 06.06.20 20.06.20 18.06.20 12 985 B KAIG3-DD-GN-C-0017-00 0

170 KAIG3 DD GN C DP 1222 0 L Foul Water Plan (FW Network Upto PS Sheet 01 of 01) 06.06.20 20.06.20 18.06.20 12 985 B KAIG3-DD-GN-C-0017-00 0

Page 89 of 111 M. Sarfraz


Consultant : DAR

Cancelled/ Total
Open Code A Code B Code C Code D
Superseded Received
Main Contractor : ZHBG

0 9 120 125 32 10 296


DESIGN DRAWING SUBMITTAL REGISTER (CIVIL) Sub Contractor :
Discipline : Composite Drawing
CIVIL EARTHWORK Rundate: 28-Feb-2023
Number of A B C D
Latest Approval Average Days Number of
Sl No. Drawing Number Rev. Description Submitted Date Received Date Days with Submittal Reference Number Rev. Remarks
Rev. Required By Outstanding Days Held
ZHBG
171 KAIG3 DD GN C DP 1260 0 L Typcial General Details (Sheet 01 of 01) 06.06.20 20.06.20 18.06.20 12 985 B KAIG3-DD-GN-C-0017-00 0

172 KAIG3 DD GN C DP 1053 0 OVERALL STORM DRAINAGE PLAN ZONE 04 06.06.20 20.06.20 20.06.20 14 983 C KAIG3-DD-GN-C-0018-00 0

173 KAIG3 DD GN C DP 1053 1 L OVERALL STORM DRAINAGE PLAN ZONE 04 04.07.20 18.07.20 14.07.20 10 959 B KAIG3-DD-GN-C-0018-01 1

174 KAIG3 DD GN C DP 1054 0 Storm Water Drainage Plan Zone-04 (Sheet 1 of 8) 06.06.20 20.06.20 20.06.20 14 983 C KAIG3-DD-GN-C-0018-00 0

175 KAIG3 DD GN C DP 1054 1 L Storm Water Drainage Plan Zone-04 (Sheet 1 of 8) 04.07.20 18.07.20 14.07.20 10 959 B KAIG3-DD-GN-C-0018-01 1

176 KAIG3 DD GN C DP 1055 0 Storm Water Drainage Plan Zone-04 (Sheet 2 of 8) 06.06.20 20.06.20 20.06.20 14 983 C KAIG3-DD-GN-C-0018-00 0

177 KAIG3 DD GN C DP 1055 1 L Storm Water Drainage Plan Zone-04 (Sheet 2 of 8) 04.07.20 18.07.20 14.07.20 10 959 B KAIG3-DD-GN-C-0018-01 1

178 KAIG3 DD GN C DP 1056 0 Storm Water Drainage Plan Zone-04 (Sheet 3 of 8) 06.06.20 20.06.20 20.06.20 14 983 C KAIG3-DD-GN-C-0018-00 0

179 KAIG3 DD GN C DP 1056 1 L Storm Water Drainage Plan Zone-04 (Sheet 3 of 8) 04.07.20 18.07.20 14.07.20 10 959 B KAIG3-DD-GN-C-0018-01 1

180 KAIG3 DD GN C DP 1057 0 Storm Water Drainage Plan Zone-04 (Sheet 4 of 8) 06.06.20 20.06.20 20.06.20 14 983 C KAIG3-DD-GN-C-0018-00 0

181 KAIG3 DD GN C DP 1057 1 L Storm Water Drainage Plan Zone-04 (Sheet 4 of 8) 04.07.20 18.07.20 14.07.20 10 959 B KAIG3-DD-GN-C-0018-01 1

182 KAIG3 DD GN C DP 1058 0 Storm Water Drainage Plan Zone-04 (Sheet 5 of 8) 06.06.20 20.06.20 20.06.20 14 983 C KAIG3-DD-GN-C-0018-00 0

183 KAIG3 DD GN C DP 1058 1 L Storm Water Drainage Plan Zone-04 (Sheet 5 of 8) 04.07.20 18.07.20 14.07.20 10 959 B KAIG3-DD-GN-C-0018-01 1

184 KAIG3 DD GN C DP 1059 0 Storm Water Drainage Plan Zone-04 (Sheet 6 of 8) 06.06.20 20.06.20 20.06.20 14 983 C KAIG3-DD-GN-C-0018-00 0

185 KAIG3 DD GN C DP 1059 1 L Storm Water Drainage Plan Zone-04 (Sheet 6 of 8) 04.07.20 18.07.20 14.07.20 10 959 B KAIG3-DD-GN-C-0018-01 1

186 KAIG3 DD GN C DP 1060 0 Storm Water Drainage Plan Zone-04 (Sheet 7 of 8) 06.06.20 20.06.20 20.06.20 14 983 C KAIG3-DD-GN-C-0018-00 0

187 KAIG3 DD GN C DP 1060 1 L Storm Water Drainage Plan Zone-04 (Sheet 7 of 8) 04.07.20 18.07.20 14.07.20 10 959 B KAIG3-DD-GN-C-0018-01 1

188 KAIG3 DD GN C DP 1061 0 Storm Water Drainage Plan Zone-04 (Sheet 8 of 8) 06.06.20 20.06.20 20.06.20 14 983 C KAIG3-DD-GN-C-0018-00 0

189 KAIG3 DD GN C DP 1061 1 L Storm Water Drainage Plan Zone-04 (Sheet 8 of 8) 04.07.20 18.07.20 14.07.20 10 959 B KAIG3-DD-GN-C-0018-01 1

190 KAIG3 DD GN C DP 1062 0 Storm Draiange Profile Zone-04 (Sheet 1 of 2) 06.06.20 20.06.20 20.06.20 14 983 C KAIG3-DD-GN-C-0018-00 0

191 KAIG3 DD GN C DP 1062 1 L Storm Draiange Profile Zone-04 (Sheet 1 of 2) 04.07.20 18.07.20 14.07.20 10 959 B KAIG3-DD-GN-C-0018-01 1

192 KAIG3 DD GN C DP 1063 0 Storm Draiange Profile Zone-04 (Sheet 2 of 2) 06.06.20 20.06.20 20.06.20 14 983 C KAIG3-DD-GN-C-0018-00 0

193 KAIG3 DD GN C DP 1063 1 L Storm Draiange Profile Zone-04 (Sheet 2 of 2) 04.07.20 18.07.20 14.07.20 10 959 B KAIG3-DD-GN-C-0018-01 1

194 KAIG3 DD GN C DP 2065 0 Utilities Cross Sections Zone-04 (Sheet 1 of 2) 06.06.20 20.06.20 20.06.20 14 983 C KAIG3-DD-GN-C-0018-00 0

195 KAIG3 DD GN C DP 2065 1 L Utilities Cross Sections Zone-04 (Sheet 1 of 2) 04.07.20 18.07.20 14.07.20 10 959 B KAIG3-DD-GN-C-0018-01 1

196 KAIG3 DD GN C DP 2066 0 Utilities Cross Sections Zone-04 (Sheet 2 of 2) 06.06.20 20.06.20 20.06.20 14 983 C KAIG3-DD-GN-C-0018-00 0

197 KAIG3 DD GN C DP 2066 1 L Utilities Cross Sections Zone-04 (Sheet 2 of 2) 04.07.20 18.07.20 14.07.20 10 959 B KAIG3-DD-GN-C-0018-01 1

198 KAIG3 DD GN C DP 8064 0 Storm Draiange Manhole and Gully Secedule Zone-04 06.06.20 20.06.20 20.06.20 14 983 C KAIG3-DD-GN-C-0018-00 0

199 KAIG3 DD GN C DP 8064 1 L Storm Draiange Manhole and Gully Secedule Zone-04 04.07.20 18.07.20 14.07.20 10 959 B KAIG3-DD-GN-C-0018-01 1

200 KAIG3 DD GN C DP 1070 0 OVERALL STORM DRAINAGE PLAN ZONE 05 6/6/2020 20.06.20 20.06.20 14 983 C KAIG3-DD-GN-C-0019-00 0
submitted on 120720
withdraw on 220720
201 KAIG3 DD GN C DP 1070 1 L OVERALL STORM DRAINAGE PLAN ZONE 05 8/9/2020 23.08.20 13.08.20 4 929 B KAIG3-DD-GN-C-0019-01 1
email/resubmitted on
100820
202 KAIG3 DD GN C DP 1071 0 Storm Water Drainage Plan Zone-05 (Sheet 1 of 16) 6/6/2020 20.06.20 20.06.20 14 983 C KAIG3-DD-GN-C-0019-00 0
submitted on 120720
withdraw on 220720
203 KAIG3 DD GN C DP 1071 1 L Storm Water Drainage Plan Zone-05 (Sheet 1 of 16) 8/9/2020 23.08.20 13.08.20 4 929 B KAIG3-DD-GN-C-0019-01 1
email/resubmitted on
100820
204 KAIG3 DD GN C DP 1072 0 Storm Water Drainage Plan Zone-05 (Sheet 2 of 16) 6/6/2020 20.06.20 20.06.20 14 983 C KAIG3-DD-GN-C-0019-00 0
submitted on 120720
withdraw on 220720
205 KAIG3 DD GN C DP 1072 1 L Storm Water Drainage Plan Zone-05 (Sheet 2 of 16) 8/9/2020 23.08.20 13.08.20 4 929 B KAIG3-DD-GN-C-0019-01 1
email/resubmitted on
100820
206 KAIG3 DD GN C DP 1073 0 Storm Water Drainage Plan Zone-05 (Sheet 3 of 16) 6/6/2020 20.06.20 20.06.20 14 983 C KAIG3-DD-GN-C-0019-00 0
submitted on 120720
withdraw on 220720
207 KAIG3 DD GN C DP 1073 1 L Storm Water Drainage Plan Zone-05 (Sheet 3 of 16) 8/9/2020 23.08.20 13.08.20 4 929 B KAIG3-DD-GN-C-0019-01 1
email/resubmitted on
100820
208 KAIG3 DD GN C DP 1074 0 Storm Water Drainage Plan Zone-05 (Sheet 4 of 16) 6/6/2020 20.06.20 20.06.20 14 983 C KAIG3-DD-GN-C-0019-00 0
submitted on 120720
withdraw on 220720
209 KAIG3 DD GN C DP 1074 1 L Storm Water Drainage Plan Zone-05 (Sheet 4 of 16) 8/9/2020 23.08.20 13.08.20 4 929 B KAIG3-DD-GN-C-0019-01 1
email/resubmitted on
100820
210 KAIG3 DD GN C DP 1075 0 Storm Water Drainage Plan Zone-05 (Sheet 5 of 16) 6/6/2020 20.06.20 20.06.20 14 983 C KAIG3-DD-GN-C-0019-00 0
submitted on 120720
withdraw on 220720
211 KAIG3 DD GN C DP 1075 1 L Storm Water Drainage Plan Zone-05 (Sheet 5 of 16) 8/9/2020 23.08.20 13.08.20 4 929 B KAIG3-DD-GN-C-0019-01 1
email/resubmitted on
100820
212 KAIG3 DD GN C DP 1076 0 Storm Water Drainage Plan Zone-05 (Sheet 6 of 16) 6/6/2020 20.06.20 20.06.20 14 983 C KAIG3-DD-GN-C-0019-00 0
submitted on 120720
withdraw on 220720
213 KAIG3 DD GN C DP 1076 1 L Storm Water Drainage Plan Zone-05 (Sheet 6 of 16) 8/9/2020 23.08.20 13.08.20 4 929 B KAIG3-DD-GN-C-0019-01 1
email/resubmitted on
100820

Page 90 of 111 M. Sarfraz


Consultant : DAR

Cancelled/ Total
Open Code A Code B Code C Code D
Superseded Received
Main Contractor : ZHBG

0 9 120 125 32 10 296


DESIGN DRAWING SUBMITTAL REGISTER (CIVIL) Sub Contractor :
Discipline : Composite Drawing
CIVIL EARTHWORK Rundate: 28-Feb-2023
Number of A B C D
Latest Approval Average Days Number of
Sl No. Drawing Number Rev. Description Submitted Date Received Date Days with Submittal Reference Number Rev. Remarks
Rev. Required By Outstanding Days Held
ZHBG
214 KAIG3 DD GN C DP 1077 0 Storm Water Drainage Plan Zone-05 (Sheet 7 of 16) 6/6/2020 20.06.20 20.06.20 14 983 C KAIG3-DD-GN-C-0019-00 0
submitted on 120720
withdraw on 220720
215 KAIG3 DD GN C DP 1077 1 L Storm Water Drainage Plan Zone-05 (Sheet 7 of 16) 8/9/2020 23.08.20 13.08.20 4 929 B KAIG3-DD-GN-C-0019-01 1
email/resubmitted on
100820
216 KAIG3 DD GN C DP 1078 0 Storm Water Drainage Plan Zone-05 (Sheet 8 of 16) 6/6/2020 20.06.20 20.06.20 14 983 C KAIG3-DD-GN-C-0019-00 0
submitted on 120720
withdraw on 220720
217 KAIG3 DD GN C DP 1078 1 L Storm Water Drainage Plan Zone-05 (Sheet 8 of 16) 8/9/2020 23.08.20 13.08.20 4 929 B KAIG3-DD-GN-C-0019-01 1
email/resubmitted on
100820
218 KAIG3 DD GN C DP 1079 0 Storm Water Drainage Plan Zone-05 (Sheet 9 of 16) 6/6/2020 20.06.20 20.06.20 14 983 C KAIG3-DD-GN-C-0019-00 0
submitted on 120720
withdraw on 220720
219 KAIG3 DD GN C DP 1079 1 L Storm Water Drainage Plan Zone-05 (Sheet 9 of 16) 8/9/2020 23.08.20 13.08.20 4 929 B KAIG3-DD-GN-C-0019-01 1
email/resubmitted on
100820
220 KAIG3 DD GN C DP 1080 0 Storm Water Drainage Plan Zone-05 (Sheet 10 of 16) 6/6/2020 20.06.20 20.06.20 14 983 C KAIG3-DD-GN-C-0019-00 0
submitted on 120720
withdraw on 220720
221 KAIG3 DD GN C DP 1080 1 L Storm Water Drainage Plan Zone-05 (Sheet 10 of 16) 8/9/2020 23.08.20 13.08.20 4 929 B KAIG3-DD-GN-C-0019-01 1
email/resubmitted on
100820
222 KAIG3 DD GN C DP 1081 0 Storm Water Drainage Plan Zone-05 (Sheet 11 of 16) 6/6/2020 20.06.20 20.06.20 14 983 C KAIG3-DD-GN-C-0019-00 0
submitted on 120720
withdraw on 220720
223 KAIG3 DD GN C DP 1081 1 L Storm Water Drainage Plan Zone-05 (Sheet 11 of 16) 8/9/2020 23.08.20 13.08.20 4 929 B KAIG3-DD-GN-C-0019-01 1
email/resubmitted on
100820
224 KAIG3 DD GN C DP 1082 0 Storm Water Drainage Plan Zone-05 (Sheet 12 of 16) 6/6/2020 20.06.20 20.06.20 14 983 C KAIG3-DD-GN-C-0019-00 0
submitted on 120720
withdraw on 220720
225 KAIG3 DD GN C DP 1082 1 L Storm Water Drainage Plan Zone-05 (Sheet 12 of 16) 8/9/2020 23.08.20 13.08.20 4 929 B KAIG3-DD-GN-C-0019-01 1
email/resubmitted on
100820
226 KAIG3 DD GN C DP 1083 0 Storm Water Drainage Plan Zone-05 (Sheet 13 of 16) 6/6/2020 20.06.20 20.06.20 14 983 C KAIG3-DD-GN-C-0019-00 0
submitted on 120720
withdraw on 220720
227 KAIG3 DD GN C DP 1083 1 L Storm Water Drainage Plan Zone-05 (Sheet 13 of 16) 8/9/2020 23.08.20 13.08.20 4 929 B KAIG3-DD-GN-C-0019-01 1
email/resubmitted on
100820
228 KAIG3 DD GN C DP 1084 0 Storm Water Drainage Plan Zone-05 (Sheet 14 of 16) 6/6/2020 20.06.20 20.06.20 14 983 C KAIG3-DD-GN-C-0019-00 0
submitted on 120720
withdraw on 220720
229 KAIG3 DD GN C DP 1084 1 L Storm Water Drainage Plan Zone-05 (Sheet 14 of 16) 8/9/2020 23.08.20 13.08.20 4 929 B KAIG3-DD-GN-C-0019-01 1
email/resubmitted on
100820
230 KAIG3 DD GN C DP 1085 0 Storm Water Drainage Plan Zone-05 (Sheet 15 of 16) 6/6/2020 20.06.20 20.06.20 14 983 C KAIG3-DD-GN-C-0019-00 0
submitted on 120720
withdraw on 220720
231 KAIG3 DD GN C DP 1085 1 L Storm Water Drainage Plan Zone-05 (Sheet 15 of 16) 8/9/2020 23.08.20 13.08.20 4 929 B KAIG3-DD-GN-C-0019-01 1
email/resubmitted on
100820
232 KAIG3 DD GN C DP 1086 0 Storm Water Drainage Plan Zone-05 (Sheet 16 of 16) 6/6/2020 20.06.20 20.06.20 14 983 C KAIG3-DD-GN-C-0019-00 0
submitted on 120720
withdraw on 220720
233 KAIG3 DD GN C DP 1086 1 L Storm Water Drainage Plan Zone-05 (Sheet 16 of 16) 8/9/2020 23.08.20 13.08.20 4 929 B KAIG3-DD-GN-C-0019-01 1
email/resubmitted on
100820
234 KAIG3 DD GN C DP 1087 0 Storm Drainge Profile Zone-05 (Sheet 1 of 3) 6/6/2020 20.06.20 20.06.20 14 983 C KAIG3-DD-GN-C-0019-00 0
submitted on 120720
withdraw on 220720
235 KAIG3 DD GN C DP 1087 1 L Storm Drainge Profile Zone-05 (Sheet 1 of 3) 8/9/2020 23.08.20 13.08.20 4 929 B KAIG3-DD-GN-C-0019-01 1
email/resubmitted on
100820
236 KAIG3 DD GN C DP 1088 0 Storm Drainge Profile Zone-05 (Sheet 2 of 3) 6/6/2020 20.06.20 20.06.20 14 983 C KAIG3-DD-GN-C-0019-00 0
submitted on 120720
withdraw on 220720
237 KAIG3 DD GN C DP 1088 1 L Storm Drainge Profile Zone-05 (Sheet 2 of 3) 8/9/2020 23.08.20 13.08.20 4 929 B KAIG3-DD-GN-C-0019-01 1
email/resubmitted on
100820
238 KAIG3 DD GN C DP 1089 0 Storm Drainge Profile Zone-05 (Sheet 3 of 3) 6/6/2020 20.06.20 20.06.20 14 983 C KAIG3-DD-GN-C-0019-00 0
submitted on 120720
withdraw on 220720
239 KAIG3 DD GN C DP 1089 1 L Storm Drainge Profile Zone-05 (Sheet 3 of 3) 8/9/2020 23.08.20 13.08.20 4 929 B KAIG3-DD-GN-C-0019-01 1
email/resubmitted on
100820
240 KAIG3 DD GN C DP 1090 0 Storm Water Typical Details Zone-05 6/6/2020 20.06.20 20.06.20 14 983 C KAIG3-DD-GN-C-0019-00 0
submitted on 120720
withdraw on 220720
241 KAIG3 DD GN C DP 1090 1 L Storm Water Typical Details Zone-05 8/9/2020 23.08.20 13.08.20 4 929 B KAIG3-DD-GN-C-0019-01 1
email/resubmitted on
100820
242 KAIG3 DD GN C DP 2045 0 Utilites Cross Section Zone-05 6/6/2020 20.06.20 20.06.20 14 983 C KAIG3-DD-GN-C-0019-00 0
submitted on 120720
withdraw on 220720
243 KAIG3 DD GN C DP 2045 1 L Utilites Cross Section Zone-05 8/9/2020 23.08.20 13.08.20 4 929 B KAIG3-DD-GN-C-0019-01 1
email/resubmitted on
100820
244 KAIG3 DD GN C DP 8040 0 Storm Drainage Manhole and Gully Schedule Zone-05 6/6/2020 20.06.20 20.06.20 14 983 C KAIG3-DD-GN-C-0019-00 0
submitted on 120720
withdraw on 220720
245 KAIG3 DD GN C DP 8040 1 L Storm Drainage Manhole and Gully Schedule Zone-05 8/9/2020 23.08.20 13.08.20 4 929 B KAIG3-DD-GN-C-0019-01 1
email/resubmitted on
100820
246 KAIG3 DD GN C DP 1093 0 Overall Storm Draiange Plan Zone 06 10.06.20 24.06.20 22.06.20 12 981 C KAIG3-DD-GN-C-0020-00 0

247 KAIG3 DD GN C DP 1093 1 L Overall Storm Draiange Plan Zone 06 06.07.20 20.07.20 09.07.20 3 964 B KAIG3-DD-GN-C-0020-01 1

248 KAIG3 DD GN C DP 1094 0 Storm Water Drainage Plan Zone-06 (Sheet 1 of 14) 10.06.20 24.06.20 22.06.20 12 981 C KAIG3-DD-GN-C-0020-00 0

249 KAIG3 DD GN C DP 1094 1 L Storm Water Drainage Plan Zone-06 (Sheet 1 of 14) 06.07.20 20.07.20 09.07.20 3 964 A KAIG3-DD-GN-C-0020-01 1

250 KAIG3 DD GN C DP 1095 0 Storm Water Drainage Plan Zone-06 (Sheet 2 of 14) 10.06.20 24.06.20 22.06.20 12 981 C KAIG3-DD-GN-C-0020-00 0

251 KAIG3 DD GN C DP 1095 1 L Storm Water Drainage Plan Zone-06 (Sheet 2 of 14) 06.07.20 20.07.20 09.07.20 3 964 A KAIG3-DD-GN-C-0020-01 1

252 KAIG3 DD GN C DP 1096 0 Storm Water Drainage Plan Zone-06 (Sheet 3 of 14) 10.06.20 24.06.20 22.06.20 12 981 C KAIG3-DD-GN-C-0020-00 0

253 KAIG3 DD GN C DP 1096 1 L Storm Water Drainage Plan Zone-06 (Sheet 3 of 14) 06.07.20 20.07.20 09.07.20 3 964 B KAIG3-DD-GN-C-0020-01 1

254 KAIG3 DD GN C DP 1097 0 Storm Water Drainage Plan Zone-06 (Sheet 4 of 14) 10.06.20 24.06.20 22.06.20 12 981 C KAIG3-DD-GN-C-0020-00 0

255 KAIG3 DD GN C DP 1097 1 L Storm Water Drainage Plan Zone-06 (Sheet 4 of 14) 06.07.20 20.07.20 09.07.20 3 964 A KAIG3-DD-GN-C-0020-01 1

256 KAIG3 DD GN C DP 1098 0 Storm Water Drainage Plan Zone-06 (Sheet 5 of 14) 10.06.20 24.06.20 22.06.20 12 981 C KAIG3-DD-GN-C-0020-00 0

Page 91 of 111 M. Sarfraz


Consultant : DAR

Cancelled/ Total
Open Code A Code B Code C Code D
Superseded Received
Main Contractor : ZHBG

0 9 120 125 32 10 296


DESIGN DRAWING SUBMITTAL REGISTER (CIVIL) Sub Contractor :
Discipline : Composite Drawing
CIVIL EARTHWORK Rundate: 28-Feb-2023
Number of A B C D
Latest Approval Average Days Number of
Sl No. Drawing Number Rev. Description Submitted Date Received Date Days with Submittal Reference Number Rev. Remarks
Rev. Required By Outstanding Days Held
ZHBG
257 KAIG3 DD GN C DP 1098 1 L Storm Water Drainage Plan Zone-06 (Sheet 5 of 14) 06.07.20 20.07.20 09.07.20 3 964 B KAIG3-DD-GN-C-0020-01 1

258 KAIG3 DD GN C DP 1099 0 Storm Water Drainage Plan Zone-06 (Sheet 6 of 14) 10.06.20 24.06.20 22.06.20 12 981 C KAIG3-DD-GN-C-0020-00 0

259 KAIG3 DD GN C DP 1099 1 L Storm Water Drainage Plan Zone-06 (Sheet 6 of 14) 06.07.20 20.07.20 09.07.20 3 964 B KAIG3-DD-GN-C-0020-01 1

260 KAIG3 DD GN C DP 1100 0 Storm Water Drainage Plan Zone-06 (Sheet 7 of 14) 10.06.20 24.06.20 22.06.20 12 981 C KAIG3-DD-GN-C-0020-00 0

261 KAIG3 DD GN C DP 1100 1 L Storm Water Drainage Plan Zone-06 (Sheet 7 of 14) 06.07.20 20.07.20 09.07.20 3 964 A KAIG3-DD-GN-C-0020-01 1

262 KAIG3 DD GN C DP 1101 0 Storm Water Drainage Plan Zone-06 (Sheet 8 of 14) 10.06.20 24.06.20 22.06.20 12 981 C KAIG3-DD-GN-C-0020-00 0

263 KAIG3 DD GN C DP 1101 1 L Storm Water Drainage Plan Zone-06 (Sheet 8 of 14) 06.07.20 20.07.20 09.07.20 3 964 A KAIG3-DD-GN-C-0020-01 1

264 KAIG3 DD GN C DP 1102 0 Storm Water Drainage Plan Zone-06 (Sheet 9 of 14) 10.06.20 24.06.20 22.06.20 12 981 C KAIG3-DD-GN-C-0020-00 0

265 KAIG3 DD GN C DP 1102 1 L Storm Water Drainage Plan Zone-06 (Sheet 9 of 14) 06.07.20 20.07.20 09.07.20 3 964 B KAIG3-DD-GN-C-0020-01 1

266 KAIG3 DD GN C DP 1103 0 Storm Water Drainage Plan Zone-06 (Sheet 10 of 14) 10.06.20 24.06.20 22.06.20 12 981 C KAIG3-DD-GN-C-0020-00 0

267 KAIG3 DD GN C DP 1103 1 L Storm Water Drainage Plan Zone-06 (Sheet 10 of 14) 06.07.20 20.07.20 09.07.20 3 964 B KAIG3-DD-GN-C-0020-01 1

268 KAIG3 DD GN C DP 1104 0 Storm Water Drainage Plan Zone-06 (Sheet 11 of 14) 10.06.20 24.06.20 22.06.20 12 981 C KAIG3-DD-GN-C-0020-00 0

269 KAIG3 DD GN C DP 1104 1 L Storm Water Drainage Plan Zone-06 (Sheet 11 of 14) 06.07.20 20.07.20 09.07.20 3 964 A KAIG3-DD-GN-C-0020-01 1

270 KAIG3 DD GN C DP 1105 0 Storm Water Drainage Plan Zone-06 (Sheet 12 of 14) 10.06.20 24.06.20 22.06.20 12 981 C KAIG3-DD-GN-C-0020-00 0

271 KAIG3 DD GN C DP 1105 1 L Storm Water Drainage Plan Zone-06 (Sheet 12 of 14) 06.07.20 20.07.20 09.07.20 3 964 A KAIG3-DD-GN-C-0020-01 1

272 KAIG3 DD GN C DP 1106 0 Storm Water Drainage Plan Zone-06 (Sheet 13 of 14) 10.06.20 24.06.20 22.06.20 12 981 C KAIG3-DD-GN-C-0020-00 0

273 KAIG3 DD GN C DP 1106 1 L Storm Water Drainage Plan Zone-06 (Sheet 13 of 14) 06.07.20 20.07.20 09.07.20 3 964 A KAIG3-DD-GN-C-0020-01 1

274 KAIG3 DD GN C DP 1107 0 Storm Water Drainage Plan Zone-06 (Sheet 14 of 14) 10.06.20 24.06.20 22.06.20 12 981 C KAIG3-DD-GN-C-0020-00 0

275 KAIG3 DD GN C DP 1107 1 L Storm Water Drainage Plan Zone-06 (Sheet 14 of 14) 06.07.20 20.07.20 09.07.20 3 964 A KAIG3-DD-GN-C-0020-01 1

276 KAIG3 DD GN C DP 2048 0 Utilites Cross Sections Zone-06 10.06.20 24.06.20 22.06.20 12 981 C KAIG3-DD-GN-C-0020-00 0

277 KAIG3 DD GN C DP 2048 1 L Utilites Cross Sections Zone-06 06.07.20 20.07.20 09.07.20 3 964 B KAIG3-DD-GN-C-0020-01 1

278 KAIG3 DD GN C DP 1115 0 L Overall Storm Drainage Plan Zone-07 10.08.20 24.08.20 19.08.20 9 923 B KAIG3-DD-GN-C-0023-00 0

279 KAIG3 DD GN C DP 1116 0 L Storm Water Drainage Plan Zone-07 Sheet 1 of 14 10.08.20 24.08.20 19.08.20 9 923 B KAIG3-DD-GN-C-0023-00 0

280 KAIG3 DD GN C DP 1117 0 L Storm Water Drainage Plan Zone-07 Sheet 2 of 14 10.08.20 24.08.20 19.08.20 9 923 B KAIG3-DD-GN-C-0023-00 0

281 KAIG3 DD GN C DP 1118 0 L Storm Water Drainage Plan Zone-07 Sheet 3 of 14 10.08.20 24.08.20 19.08.20 9 923 B KAIG3-DD-GN-C-0023-00 0

282 KAIG3 DD GN C DP 1119 0 L Storm Water Drainage Plan Zone-07 Sheet 4 of 14 10.08.20 24.08.20 19.08.20 9 923 B KAIG3-DD-GN-C-0023-00 0

283 KAIG3 DD GN C DP 1120 0 L Storm Water Drainage Plan Zone-07 Sheet 5 of 14 10.08.20 24.08.20 19.08.20 9 923 B KAIG3-DD-GN-C-0023-00 0

284 KAIG3 DD GN C DP 1121 0 L Storm Water Drainage Plan Zone-07 Sheet 6 of 14 10.08.20 24.08.20 19.08.20 9 923 B KAIG3-DD-GN-C-0023-00 0

285 KAIG3 DD GN C DP 1122 0 L Storm Water Drainage Plan Zone-07 Sheet 7 of 14 10.08.20 24.08.20 19.08.20 9 923 B KAIG3-DD-GN-C-0023-00 0

286 KAIG3 DD GN C DP 1123 0 L Storm Water Drainage Plan Zone-07 Sheet 8 of 14 10.08.20 24.08.20 19.08.20 9 923 B KAIG3-DD-GN-C-0023-00 0

287 KAIG3 DD GN C DP 1124 0 L Storm Water Drainage Plan Zone-07 Sheet 9 of 14 10.08.20 24.08.20 19.08.20 9 923 B KAIG3-DD-GN-C-0023-00 0

288 KAIG3 DD GN C DP 1125 0 L Storm Water Drainage Plan Zone-07 Sheet 10 of 14 10.08.20 24.08.20 19.08.20 9 923 B KAIG3-DD-GN-C-0023-00 0

289 KAIG3 DD GN C DP 1126 0 L Storm Water Drainage Plan Zone-07 Sheet 11 of 14 10.08.20 24.08.20 19.08.20 9 923 B KAIG3-DD-GN-C-0023-00 0

290 KAIG3 DD GN C DP 1127 0 L Storm Water Drainage Plan Zone-07 Sheet 12 of 14 10.08.20 24.08.20 19.08.20 9 923 B KAIG3-DD-GN-C-0023-00 0

291 KAIG3 DD GN C DP 1128 0 L Storm Water Drainage Plan Zone-07 Sheet 13 of 14 10.08.20 24.08.20 19.08.20 9 923 B KAIG3-DD-GN-C-0023-00 0

292 KAIG3 DD GN C DP 1129 0 L Storm Water Drainage Plan Zone-07 Sheet 14 of 14 10.08.20 24.08.20 19.08.20 9 923 B KAIG3-DD-GN-C-0023-00 0

293 KAIG3 DD GN C DP 2130 0 L Storm Drainage Profile (Sheet 1 of 2) 10.08.20 24.08.20 19.08.20 9 923 B KAIG3-DD-GN-C-0023-00 0

294 KAIG3 DD GN C DP 2131 0 L Storm Drainage Profile (Sheet 2 of 2) 10.08.20 24.08.20 19.08.20 9 923 B KAIG3-DD-GN-C-0023-00 0

295 KAIG3 DD GN C DP 2050 0 L Utilities Cross Section Zone-07 10.08.20 24.08.20 19.08.20 9 923 B KAIG3-DD-GN-C-0023-00 0

296 KAIG3 DD GN C DP 8044 0 L Storm Drainage Manhole Schedule Zone-07 10.08.20 24.08.20 19.08.20 9 923 B KAIG3-DD-GN-C-0023-00 0

297 44985

298 44985

299 44985

Page 92 of 111 M. Sarfraz


Consultant : DAR

Cancelled/ Total
Open Code A Code B Code C Code D
Superseded Received
Main Contractor : ZHBG

0 9 120 125 32 10 296


DESIGN DRAWING SUBMITTAL REGISTER (CIVIL) Sub Contractor :
Discipline : Composite Drawing
CIVIL EARTHWORK Rundate: 28-Feb-2023
Number of A B C D
Latest Approval Average Days Number of
Sl No. Drawing Number Rev. Description Submitted Date Received Date Days with Submittal Reference Number Rev. Remarks
Rev. Required By Outstanding Days Held
ZHBG
300 44985

301 44985

302 44985

303 44985

304 44985

305 44985

306 44985

307 44985

308 44985 44985

309 44985 44985

Page 93 of 111 M. Sarfraz


Consultant : DAR

Cancelled/ Total
Open Code A Code B Code C Code D
Superseded Received
Main Contractor : ZHBG

0 0 0 0 0 0 0
DESGIN DRAWING SUBMITTAL REGISTER (CIVIL) Sub Contractor :
Discipline : Composite Drawing
CIVIL ENVIRONMENTAL Rundate: 28-Feb-2023
A B C D
Latest Approval Average Days Number of
Sl No. Drawing Number Rev. Description Submitted Date Received Date Submittal Reference Number Rev. Remarks
Rev. Required By Outstanding Days Held

Prroject Author Type of Nature of Serial Dwg


Building Discplline Sub-Disc Level Area
Name Co. Dwg Dwg No no.

1 13.01.00 44985

2 13.01.00 44985

3 13.01.00 44985

4 13.01.00 44985

5 13.01.00 44985

6 13.01.00 44985

7 13.01.00 44985

13.01.00 44985

8 13.01.00 44985

9 13.01.00 44985

10 13.01.00 44985

11 13.01.00 44985

12 13.01.00 44985

13 13.01.00 44985

14 13.01.00 44985

15 13.01.00 44985

16 13.01.00 44985

17 13.01.00 44985

18 13.01.00 44985

19 13.01.00 44985

20 13.01.00 44985

21 13.01.00 44985

22 13.01.00 44985

23 13.01.00 44985

24 13.01.00 44985

25 13.01.00 44985

26 13.01.00 44985

27 13.01.00 44985

28 13.01.00 44985

29 13.01.00 44985

30 13.01.00 44985

31 13.01.00 44985

32 13.01.00 44985

33 13.01.00 44985

Page 94 of 111 M. Sarfraz


Consultant : DAR

Cancelled/ Total
Open Code A Code B Code C Code D
Superseded Received
Main Contractor : ZHBG

0 0 0 0 0 0 0
DESGIN DRAWING SUBMITTAL REGISTER (CIVIL) Sub Contractor :
Discipline : Composite Drawing
CIVIL ENVIRONMENTAL Rundate: 28-Feb-2023
A B C D
Latest Approval Average Days Number of
Sl No. Drawing Number Rev. Description Submitted Date Received Date Submittal Reference Number Rev. Remarks
Rev. Required By Outstanding Days Held

Page 95 of 111 M. Sarfraz


Consultant : DAR

Cancelled/ Total
Open Code A Code B Code C Code D
Superseded Received
Main Contractor : ZHBG

0 0 0 0 0 0 0
DESIGN DRAWING SUBMITTAL REGISTER (CIVIL) Sub Contractor :
Discipline : Composite Drawing
CIVIL HEDROLOGY Rundate: 28-Feb-2023
A B C D
Latest Approval Average Days Number of
Sl No. Drawing Number Rev. Description Submitted Date Received Date Submittal Reference Number Rev. Remarks
Rev. Required By Outstanding Days Held

Prroject Author Type of Nature of Serial Dwg


Building Discplline Sub-Disc Level Area
Name Co. Dwg Dwg No no.

1 13.01.00 44985

2 13.01.00 44985

3 13.01.00 44985

4 13.01.00 44985

5 13.01.00 44985

6 13.01.00 44985

7 13.01.00 44985

13.01.00 44985

8 13.01.00 44985

9 13.01.00 44985

10 13.01.00 44985

11 13.01.00 44985

12 13.01.00 44985

13 13.01.00 44985

14 13.01.00 44985

15 13.01.00 44985

16 13.01.00 44985

17 13.01.00 44985

18 13.01.00 44985

19 13.01.00 44985

20 13.01.00 44985

21 13.01.00 44985

22 13.01.00 44985

23 13.01.00 44985

24 13.01.00 44985

25 13.01.00 44985

26 13.01.00 44985

27 13.01.00 44985

28 13.01.00 44985

29 13.01.00 44985

30 13.01.00 44985

31 13.01.00 44985

32 13.01.00 44985

33 13.01.00 44985

Page 96 of 111 M. Sarfraz


Consultant : DAR

Cancelled/ Total
Open Code A Code B Code C Code D
Superseded Received
Main Contractor : ZHBG

0 0 0 0 0 0 0
DESIGN DRAWING SUBMITTAL REGISTER (CIVIL) Sub Contractor :
Discipline : Composite Drawing
CIVIL HEDROLOGY Rundate: 28-Feb-2023
A B C D
Latest Approval Average Days Number of
Sl No. Drawing Number Rev. Description Submitted Date Received Date Submittal Reference Number Rev. Remarks
Rev. Required By Outstanding Days Held

Page 97 of 111 M. Sarfraz


Consultant : DAR

Cancelled/ Total
Open Code A Code B Code C Code D
Superseded Received
Main Contractor : ZHBG

0 6 51 89 0 0 178
DESIGN DRAWING SUBMITTAL REGISTER (CIVIL) Sub Contractor :
Discipline : Composite Drawing
CIVIL TRANSPORTATION Rundate: 28-Feb-2023
Number of A B C D F
Latest Approval Average Days Number of
Sl No. Drawing Number Rev. Description Submitted Date Received Date Days with Submittal Reference Number Rev. Remarks
Rev. Required By Outstanding Days Held
ZHBG

1 KAIG3 DD GN C GA 1019 0 Road Staking Key Plan 18.03.20 01.04.20 02.04.20 15 1062 C KAIG3-DD-GN-C-0001 0

2 KAIG3 DD GN C GA 1019 1 L Road Staking Key Plan 22.06.20 06.07.20 23.06.20 1 980 F KAIG3-DD-GN-C-0001 1

3 KAIG3 DD GN C GA 1020 0 Road Staking Plan & Data (Sheet 1 of 13) 18.03.20 01.04.20 02.04.20 15 1062 C KAIG3-DD-GN-C-0001 0

4 KAIG3 DD GN C GA 1020 1 L Road Staking Plan & Data (Sheet 1 of 15) 22.06.20 06.07.20 23.06.20 1 980 F KAIG3-DD-GN-C-0001 1

5 KAIG3 DD GN C GA 1021 0 Road Staking Plan & Data (Sheet 2 of 13) 18.03.20 01.04.20 02.04.20 15 1062 C KAIG3-DD-GN-C-0001 0

6 KAIG3 DD GN C GA 1021 1 L Road Staking Plan & Data (Sheet 2 of 15) 22.06.20 06.07.20 23.06.20 1 980 F KAIG3-DD-GN-C-0001 1

7 KAIG3 DD GN C GA 1022 0 Road Staking Plan & Data (Sheet 3 of 13) 18.03.20 01.04.20 02.04.20 15 1062 C KAIG3-DD-GN-C-0001 0

8 KAIG3 DD GN C GA 1022 1 L Road Staking Plan & Data (Sheet 3 of 15) 22.06.20 06.07.20 23.06.20 1 980 F KAIG3-DD-GN-C-0001 1

9 KAIG3 DD GN C GA 1023 0 Road Staking Plan & Data (Sheet 4 of 13) 18.03.20 01.04.20 02.04.20 15 1062 C KAIG3-DD-GN-C-0001 0

10 KAIG3 DD GN C GA 1023 1 L Road Staking Plan & Data (Sheet 4 of 15) 22.06.20 06.07.20 23.06.20 1 980 F KAIG3-DD-GN-C-0001 1

11 KAIG3 DD GN C GA 1024 0 Road Staking Plan & Data (Sheet 5 of 13) 18.03.20 01.04.20 02.04.20 15 1062 C KAIG3-DD-GN-C-0001 0

12 KAIG3 DD GN C GA 1024 1 L Road Staking Plan & Data (Sheet 5 of 15) 22.06.20 06.07.20 23.06.20 1 980 F KAIG3-DD-GN-C-0001 1

13 KAIG3 DD GN C GA 1025 0 Road Staking Plan & Data (Sheet 6 of 13) 18.03.20 01.04.20 02.04.20 15 1062 C KAIG3-DD-GN-C-0001 0

14 KAIG3 DD GN C GA 1025 1 L Road Staking Plan & Data (Sheet 6 of 15) 22.06.20 06.07.20 23.06.20 1 980 F KAIG3-DD-GN-C-0001 1

15 KAIG3 DD GN C GA 1026 0 Road Staking Plan & Data (Sheet 7 of 13) 18.03.20 01.04.20 02.04.20 15 1062 C KAIG3-DD-GN-C-0001 0

16 KAIG3 DD GN C GA 1026 1 L Road Staking Plan & Data (Sheet 7 of 15) 22.06.20 06.07.20 23.06.20 1 980 F KAIG3-DD-GN-C-0001 1

17 KAIG3 DD GN C GA 1027 0 Road Staking Plan & Data (Sheet 8 of 13) 18.03.20 01.04.20 02.04.20 15 1062 C KAIG3-DD-GN-C-0001 0

18 KAIG3 DD GN C GA 1027 1 L Road Staking Plan & Data (Sheet 8 of 15) 22.06.20 06.07.20 23.06.20 1 980 F KAIG3-DD-GN-C-0001 1

19 KAIG3 DD GN C GA 1028 0 Road Staking Plan & Data (Sheet 9 of 13) 18.03.20 01.04.20 02.04.20 15 1062 C KAIG3-DD-GN-C-0001 0

20 KAIG3 DD GN C GA 1028 1 L Road Staking Plan & Data (Sheet 9 of 15) 22.06.20 06.07.20 23.06.20 1 980 F KAIG3-DD-GN-C-0001 1

21 KAIG3 DD GN C GA 1029 0 Road Staking Plan & Data (Sheet 10 of 13) 18.03.20 01.04.20 02.04.20 15 1062 C KAIG3-DD-GN-C-0001 0

22 KAIG3 DD GN C GA 1029 1 L Road Staking Plan & Data (Sheet 10 of 15) 22.06.20 06.07.20 23.06.20 1 980 F KAIG3-DD-GN-C-0001 1

23 KAIG3 DD GN C GA 1030 0 Road Staking Plan & Data (Sheet 11 of 13) 18.03.20 01.04.20 02.04.20 15 1062 C KAIG3-DD-GN-C-0001 0

24 KAIG3 DD GN C GA 1030 1 L Road Staking Plan & Data (Sheet 11 of 15) 22.06.20 06.07.20 23.06.20 1 980 F KAIG3-DD-GN-C-0001 1

25 KAIG3 DD GN C GA 1031 0 Road Staking Plan & Data (Sheet 12 of 13) 18.03.20 01.04.20 02.04.20 15 1062 C KAIG3-DD-GN-C-0001 0

26 KAIG3 DD GN C GA 1031 1 L Road Staking Plan & Data (Sheet 12 of 15) 22.06.20 06.07.20 23.06.20 1 980 F KAIG3-DD-GN-C-0001 1

27 KAIG3 DD GN C GA 1032 0 Road Staking Plan & Data (Sheet 13 of 13) 18.03.20 01.04.20 02.04.20 15 1062 C KAIG3-DD-GN-C-0001 0

28 KAIG3 DD GN C GA 1032 1 L Road Staking Plan & Data (Sheet 13 of 15) 22.06.20 06.07.20 23.06.20 1 980 F KAIG3-DD-GN-C-0001 1

29 KAIG3 DD GN C GA 1033 0 L Road Staking Plan & Data (Sheet 14 of 15) 22.06.20 06.07.20 23.06.20 1 980 F KAIG3-DD-GN-C-0001 1

30 KAIG3 DD GN C GA 1134 0 L Road Staking Plan & Data (Sheet 15 of 15) 22.06.20 06.07.20 23.06.20 1 980 F KAIG3-DD-GN-C-0001 1

31 KAIG3 DD GN C GA 1034 0 L Road Demolition Key Plan 18.03.20 01.04.20 31.03.20 13 1064 C KAIG3-DD-GN-C-0002 0

32 KAIG3 DD GN C GA 1035 0 L Road Demolition Plan (Sheet 1 of 4) 18.03.20 01.04.20 31.03.20 13 1064 C KAIG3-DD-GN-C-0002 0

33 KAIG3 DD GN C GA 1036 0 L Road Demolition Plan (Sheet 2 of 4) 18.03.20 01.04.20 31.03.20 13 1064 C KAIG3-DD-GN-C-0002 0

34 KAIG3 DD GN C GA 1037 0 L Road Demolition Plan (Sheet 3 of 4) 18.03.20 01.04.20 31.03.20 13 1064 C KAIG3-DD-GN-C-0002 0

35 KAIG3 DD GN C GA 1038 0 L Road Demolition Plan (Sheet 4 of 4) 18.03.20 01.04.20 31.03.20 13 1064 C KAIG3-DD-GN-C-0002 0

36 KAIG3 DD GN C GA 1003 0 L Topographic Survey Layout Plan (Sheet 1 of 1) 18.03.20 01.04.20 24.03.20 6 1071 O KAIG3-DD-GN-C-0003 0

37 KAIG3 DD GN C GA 1004 0 L Topographic Survey Plan (Sheet 1 of 15) 18.03.20 01.04.20 24.03.20 6 1071 O KAIG3-DD-GN-C-0003 0

38 KAIG3 DD GN C GA 1005 0 L Topographic Survey Plan (Sheet 2 of 15) 18.03.20 01.04.20 24.03.20 6 1071 O KAIG3-DD-GN-C-0003 0

39 KAIG3 DD GN C GA 1006 0 L Topographic Survey Plan (Sheet 3 of 15) 18.03.20 01.04.20 24.03.20 6 1071 O KAIG3-DD-GN-C-0003 0

40 KAIG3 DD GN C GA 1007 0 L Topographic Survey Plan (Sheet 4 of 15) 18.03.20 01.04.20 24.03.20 6 1071 O KAIG3-DD-GN-C-0003 0

41 KAIG3 DD GN C GA 1008 0 L Topographic Survey Plan (Sheet 5 of 15) 18.03.20 01.04.20 24.03.20 6 1071 O KAIG3-DD-GN-C-0003 0

42 KAIG3 DD GN C GA 1009 0 L Topographic Survey Plan (Sheet 6 of 15) 18.03.20 01.04.20 24.03.20 6 1071 O KAIG3-DD-GN-C-0003 0

Page 98 of 111 M. Sarfraz


Consultant : DAR

Cancelled/ Total
Open Code A Code B Code C Code D
Superseded Received
Main Contractor : ZHBG

0 6 51 89 0 0 178
DESIGN DRAWING SUBMITTAL REGISTER (CIVIL) Sub Contractor :
Discipline : Composite Drawing
CIVIL TRANSPORTATION Rundate: 28-Feb-2023
Number of A B C D F
Latest Approval Average Days Number of
Sl No. Drawing Number Rev. Description Submitted Date Received Date Days with Submittal Reference Number Rev. Remarks
Rev. Required By Outstanding Days Held
ZHBG
43 KAIG3 DD GN C GA 1010 0 L Topographic Survey Plan (Sheet 7 of 15) 18.03.20 01.04.20 24.03.20 6 1071 O KAIG3-DD-GN-C-0003 0

44 KAIG3 DD GN C GA 1011 0 L Topographic Survey Plan (Sheet 8 of 15) 18.03.20 01.04.20 24.03.20 6 1071 O KAIG3-DD-GN-C-0003 0

45 KAIG3 DD GN C GA 1012 0 L Topographic Survey Plan (Sheet 9 of 15) 18.03.20 01.04.20 24.03.20 6 1071 O KAIG3-DD-GN-C-0003 0

46 KAIG3 DD GN C GA 1013 0 L Topographic Survey Plan (Sheet 10 of 15) 18.03.20 01.04.20 24.03.20 6 1071 O KAIG3-DD-GN-C-0003 0

47 KAIG3 DD GN C GA 1014 0 L Topographic Survey Plan (Sheet 11 of 15) 18.03.20 01.04.20 24.03.20 6 1071 O KAIG3-DD-GN-C-0003 0

48 KAIG3 DD GN C GA 1015 0 L Topographic Survey Plan (Sheet 12 of 15) 18.03.20 01.04.20 24.03.20 6 1071 O KAIG3-DD-GN-C-0003 0

49 KAIG3 DD GN C GA 1016 0 L Topographic Survey Plan (Sheet 13 of 15) 18.03.20 01.04.20 24.03.20 6 1071 O KAIG3-DD-GN-C-0003 0

50 KAIG3 DD GN C GA 1017 0 L Topographic Survey Plan (Sheet 14 of 15) 18.03.20 01.04.20 24.03.20 6 1071 O KAIG3-DD-GN-C-0003 0

51 KAIG3 DD GN C GA 1018 0 L Topographic Survey Plan (Sheet 15 of 15) 18.03.20 01.04.20 24.03.20 6 1071 O KAIG3-DD-GN-C-0003 0

52 KAIG3 DD GN C DP 1035 0 Storm Drainage Channel and Culvert Plan & Profile (North Area) 19.03.20 02.04.20 26.03.20 7 1069 C KAIG3-DD-GN-C-0004 0

53 KAIG3 DD GN C DP 1035 1 L Storm Drainage Channel and Culvert Plan & Profile (North Area) 13.04.20 27.04.20 28.04.20 15 1036 B KAIG3-DD-GN-C-0004 1 Throgh PSW Only

54 KAIG3 DD GN C GA 1036 0 Box Culvert Details (Sheet 1 of 2) 19.03.20 02.04.20 26.03.20 7 1069 C KAIG3-DD-GN-C-0004 0

55 KAIG3 DD GN C GA 1036 1 L Storm Box Culvert Details 13.04.20 27.04.20 28.04.20 15 1036 B KAIG3-DD-GN-C-0004 1 Throgh PSW Only

56 KAIG3 DD GN C GA 1037 0 Box Culvert Details (Sheet 1 of 2) 19.03.20 02.04.20 26.03.20 7 1069 C KAIG3-DD-GN-C-0004 0

57 KAIG3 DD GN C GA 1037 1 L Storm Channel and Chamber Detials 13.04.20 27.04.20 28.04.20 15 1036 B KAIG3-DD-GN-C-0004 1 Throgh PSW Only

58 KAIG3 DD GN C GA 1038 0 L Storm Box Culvert and Manhole Details 13.04.20 27.04.20 28.04.20 15 1036 B KAIG3-DD-GN-C-0004 1 Throgh PSW Only

59 KAIG3 DD RD C GA 1060 0 L Road Dimension Key Plan 21.03.20 04.04.20 31.03.20 10 1064 C KAIG3-DD-RD-C-0006 0

60 KAIG3 DD RD C GA 1061 0 L Road Dimension Plan (Sheet 01 of 15) 21.03.20 04.04.20 31.03.20 10 1064 C KAIG3-DD-RD-C-0006 0

61 KAIG3 DD RD C GA 1062 0 L Road Dimension Plan (Sheet 02 of 15) 21.03.20 04.04.20 31.03.20 10 1064 C KAIG3-DD-RD-C-0006 0

62 KAIG3 DD RD C GA 1063 0 L Road Dimension Plan (Sheet 03 of 15) 21.03.20 04.04.20 31.03.20 10 1064 C KAIG3-DD-RD-C-0006 0

63 KAIG3 DD RD C GA 1064 0 L Road Dimension Plan (Sheet 04 of 15) 21.03.20 04.04.20 31.03.20 10 1064 C KAIG3-DD-RD-C-0006 0

64 KAIG3 DD RD C GA 1065 0 L Road Dimension Plan (Sheet 05 of 15) 21.03.20 04.04.20 31.03.20 10 1064 C KAIG3-DD-RD-C-0006 0

65 KAIG3 DD RD C GA 1066 0 L Road Dimension Plan (Sheet 06 of 15) 21.03.20 04.04.20 31.03.20 10 1064 C KAIG3-DD-RD-C-0006 0

66 KAIG3 DD RD C GA 1067 0 L Road Dimension Plan (Sheet 07 of 15) 21.03.20 04.04.20 31.03.20 10 1064 C KAIG3-DD-RD-C-0006 0

67 KAIG3 DD RD C GA 1068 0 L Road Dimension Plan (Sheet 08 of 15) 21.03.20 04.04.20 31.03.20 10 1064 C KAIG3-DD-RD-C-0006 0

68 KAIG3 DD RD C GA 1069 0 L Road Dimension Plan (Sheet 09 of 15) 21.03.20 04.04.20 31.03.20 10 1064 C KAIG3-DD-RD-C-0006 0

69 KAIG3 DD RD C GA 1070 0 L Road Dimension Plan (Sheet 10 of 15) 21.03.20 04.04.20 31.03.20 10 1064 C KAIG3-DD-RD-C-0006 0

70 KAIG3 DD RD C GA 1071 0 L Road Dimension Plan (Sheet 11 of 15) 21.03.20 04.04.20 31.03.20 10 1064 C KAIG3-DD-RD-C-0006 0

71 KAIG3 DD RD C GA 1072 0 L Road Dimension Plan (Sheet 12 of 15) 21.03.20 04.04.20 31.03.20 10 1064 C KAIG3-DD-RD-C-0006 0

72 KAIG3 DD RD C GA 1073 0 L Road Dimension Plan (Sheet 13 of 15) 21.03.20 04.04.20 31.03.20 10 1064 C KAIG3-DD-RD-C-0006 0

73 KAIG3 DD RD C GA 1074 0 L Road Dimension Plan (Sheet 14 of 15) 21.03.20 04.04.20 31.03.20 10 1064 C KAIG3-DD-RD-C-0006 0

74 KAIG3 DD RD C GA 1075 0 L Road Dimension Plan (Sheet 15 of 15) 21.03.20 04.04.20 31.03.20 10 1064 C KAIG3-DD-RD-C-0006 0

75 KAIG3 DD RD C GA 1040 0 Earth Work Quantities 22.04.20 06.05.20 13.05.20 21 1021 C KAIG3-DD-RD-C-0010 0 Hardcopy provided to DAR

76 KAIG3 DD RD C GA 1040 1 L Earth Work Quantities 20.05.20 03.06.20 07.06.20 18 996 B KAIG3-DD-RD-C-0010 1

77 KAIG3 DD RD C GA 1080 0 Road Profiles (Sheet 1 of 17) 22.04.20 06.05.20 13.05.20 21 1021 C KAIG3-DD-RD-C-0010 0 Hardcopy provided to DAR

78 KAIG3 DD RD C GA 1080 1 L Road Profiles (Sheet 1 of 17) 20.05.20 03.06.20 07.06.20 18 996 B KAIG3-DD-RD-C-0010 1

79 KAIG3 DD RD C GA 1081 0 Road Profiles (Sheet 2 of 17) 22.04.20 06.05.20 13.05.20 21 1021 C KAIG3-DD-RD-C-0010 0 Hardcopy provided to DAR

80 KAIG3 DD RD C GA 1081 1 L Road Profiles (Sheet 2 of 17) 20.05.20 03.06.20 07.06.20 18 996 B KAIG3-DD-RD-C-0010 1

81 KAIG3 DD RD C GA 1082 0 Road Profiles (Sheet 3 of 17) 22.04.20 06.05.20 13.05.20 21 1021 C KAIG3-DD-RD-C-0010 0 Hardcopy provided to DAR

82 KAIG3 DD RD C GA 1082 1 L Road Profiles (Sheet 3 of 17) 20.05.20 03.06.20 07.06.20 18 996 B KAIG3-DD-RD-C-0010 1

83 KAIG3 DD RD C GA 1083 0 Road Profiles (Sheet 4 of 17) 22.04.20 06.05.20 13.05.20 21 1021 C KAIG3-DD-RD-C-0010 0 Hardcopy provided to DAR

84 KAIG3 DD RD C GA 1083 1 L Road Profiles (Sheet 4 of 17) 20.05.20 03.06.20 07.06.20 18 996 B KAIG3-DD-RD-C-0010 1

85 KAIG3 DD RD C GA 1084 0 Road Profiles (Sheet 5 of 17) 22.04.20 06.05.20 13.05.20 21 1021 C KAIG3-DD-RD-C-0010 0 Hardcopy provided to DAR

Page 99 of 111 M. Sarfraz


Consultant : DAR

Cancelled/ Total
Open Code A Code B Code C Code D
Superseded Received
Main Contractor : ZHBG

0 6 51 89 0 0 178
DESIGN DRAWING SUBMITTAL REGISTER (CIVIL) Sub Contractor :
Discipline : Composite Drawing
CIVIL TRANSPORTATION Rundate: 28-Feb-2023
Number of A B C D F
Latest Approval Average Days Number of
Sl No. Drawing Number Rev. Description Submitted Date Received Date Days with Submittal Reference Number Rev. Remarks
Rev. Required By Outstanding Days Held
ZHBG
86 KAIG3 DD RD C GA 1084 1 L Road Profiles (Sheet 5 of 17) 20.05.20 03.06.20 07.06.20 18 996 B KAIG3-DD-RD-C-0010 1

87 KAIG3 DD RD C GA 1085 0 Road Profiles (Sheet 6 of 17) 22.04.20 06.05.20 13.05.20 21 1021 C KAIG3-DD-RD-C-0010 0 Hardcopy provided to DAR

88 KAIG3 DD RD C GA 1085 1 L Road Profiles (Sheet 6 of 17) 20.05.20 03.06.20 07.06.20 18 996 B KAIG3-DD-RD-C-0010 1

89 KAIG3 DD RD C GA 1086 0 Road Profiles (Sheet 7 of 17) 22.04.20 06.05.20 13.05.20 21 1021 C KAIG3-DD-RD-C-0010 0 Hardcopy provided to DAR

90 KAIG3 DD RD C GA 1086 1 L Road Profiles (Sheet 7 of 17) 20.05.20 03.06.20 07.06.20 18 996 B KAIG3-DD-RD-C-0010 1

91 KAIG3 DD RD C GA 1087 0 Road Profiles (Sheet 8 of 17) 22.04.20 06.05.20 13.05.20 21 1021 C KAIG3-DD-RD-C-0010 0 Hardcopy provided to DAR

92 KAIG3 DD RD C GA 1087 1 L Road Profiles (Sheet 8 of 17) 20.05.20 03.06.20 07.06.20 18 996 B KAIG3-DD-RD-C-0010 1

93 KAIG3 DD RD C GA 1088 0 Road Profiles (Sheet 9 of 17) 22.04.20 06.05.20 13.05.20 21 1021 C KAIG3-DD-RD-C-0010 0 Hardcopy provided to DAR

94 KAIG3 DD RD C GA 1088 1 L Road Profiles (Sheet 9 of 17) 20.05.20 03.06.20 07.06.20 18 996 B KAIG3-DD-RD-C-0010 1

95 KAIG3 DD RD C GA 1089 0 Road Profiles (Sheet 10 of 17) 22.04.20 06.05.20 13.05.20 21 1021 C KAIG3-DD-RD-C-0010 0 Hardcopy provided to DAR

96 KAIG3 DD RD C GA 1089 1 L Road Profiles (Sheet 10 of 17) 20.05.20 03.06.20 07.06.20 18 996 B KAIG3-DD-RD-C-0010 1

97 KAIG3 DD RD C GA 1090 0 Road Profiles (Sheet 11 of 17) 22.04.20 06.05.20 13.05.20 21 1021 C KAIG3-DD-RD-C-0010 0 Hardcopy provided to DAR

98 KAIG3 DD RD C GA 1090 1 L Road Profiles (Sheet 11 of 17) 20.05.20 03.06.20 07.06.20 18 996 B KAIG3-DD-RD-C-0010 1

99 KAIG3 DD RD C GA 1091 0 Road Profiles (Sheet 12 of 17) 22.04.20 06.05.20 13.05.20 21 1021 C KAIG3-DD-RD-C-0010 0 Hardcopy provided to DAR

100 KAIG3 DD RD C GA 1091 1 L Road Profiles (Sheet 12 of 17) 20.05.20 03.06.20 07.06.20 18 996 B KAIG3-DD-RD-C-0010 1

101 KAIG3 DD RD C GA 1092 0 Road Profiles (Sheet 13 of 17) 22.04.20 06.05.20 13.05.20 21 1021 C KAIG3-DD-RD-C-0010 0 Hardcopy provided to DAR

102 KAIG3 DD RD C GA 1092 1 L Road Profiles (Sheet 13 of 17) 20.05.20 03.06.20 07.06.20 18 996 B KAIG3-DD-RD-C-0010 1

103 KAIG3 DD RD C GA 1093 0 Road Profiles (Sheet 14 of 17) 22.04.20 06.05.20 13.05.20 21 1021 C KAIG3-DD-RD-C-0010 0 Hardcopy provided to DAR

104 KAIG3 DD RD C GA 1093 1 L Road Profiles (Sheet 14 of 17) 20.05.20 03.06.20 07.06.20 18 996 B KAIG3-DD-RD-C-0010 1

105 KAIG3 DD RD C GA 1094 0 Road Profiles (Sheet 15 of 17) 22.04.20 06.05.20 13.05.20 21 1021 C KAIG3-DD-RD-C-0010 0 Hardcopy provided to DAR

106 KAIG3 DD RD C GA 1094 1 L Road Profiles (Sheet 15 of 17) 20.05.20 03.06.20 07.06.20 18 996 B KAIG3-DD-RD-C-0010 1

107 KAIG3 DD RD C GA 1095 0 Road Profiles (Sheet 16 of 17) 22.04.20 06.05.20 13.05.20 21 1021 C KAIG3-DD-RD-C-0010 0 Hardcopy provided to DAR

108 KAIG3 DD RD C GA 1095 1 L Road Profiles (Sheet 16 of 17) 20.05.20 03.06.20 07.06.20 18 996 B KAIG3-DD-RD-C-0010 1

109 KAIG3 DD RD C GA 1096 0 Road Profiles (Sheet 17 of 17) 22.04.20 06.05.20 13.05.20 21 1021 C KAIG3-DD-RD-C-0010 0 Hardcopy provided to DAR

110 KAIG3 DD RD C GA 1096 1 L Road Profiles (Sheet 17 of 17) 20.05.20 03.06.20 07.06.20 18 996 B KAIG3-DD-RD-C-0010 1

111 KAIG3 DD RD C GA 1100 0 Road Grading Key Plan 22.04.20 06.05.20 13.05.20 21 1021 C KAIG3-DD-RD-C-0010 0 Hardcopy provided to DAR

112 KAIG3 DD RD C GA 1100 1 L Road Grading Key Plan 20.05.20 03.06.20 07.06.20 18 996 B KAIG3-DD-RD-C-0010 1

113 KAIG3 DD RD C GA 1101 0 Road Grading Plan Sheet ( 1 of 15) 22.04.20 06.05.20 13.05.20 21 1021 C KAIG3-DD-RD-C-0010 0 Hardcopy provided to DAR

114 KAIG3 DD RD C GA 1101 1 L Road Grading Plan Sheet ( 1 of 15) 20.05.20 03.06.20 07.06.20 18 996 B KAIG3-DD-RD-C-0010 1

115 KAIG3 DD RD C GA 1102 0 Road Grading Plan Sheet ( 2 of 15) 22.04.20 06.05.20 13.05.20 21 1021 C KAIG3-DD-RD-C-0010 0 Hardcopy provided to DAR

116 KAIG3 DD RD C GA 1102 1 L Road Grading Plan Sheet ( 2 of 15) 20.05.20 03.06.20 07.06.20 18 996 C KAIG3-DD-RD-C-0010 1

117 KAIG3 DD RD C GA 1103 0 Road Grading Plan Sheet ( 3 of 15) 22.04.20 06.05.20 13.05.20 21 1021 C KAIG3-DD-RD-C-0010 0 Hardcopy provided to DAR

118 KAIG3 DD RD C GA 1103 1 L Road Grading Plan Sheet ( 3 of 15) 20.05.20 03.06.20 07.06.20 18 996 B KAIG3-DD-RD-C-0010 1

119 KAIG3 DD RD C GA 1104 0 Road Grading Plan Sheet ( 4 of 15) 22.04.20 06.05.20 13.05.20 21 1021 C KAIG3-DD-RD-C-0010 0 Hardcopy provided to DAR

120 KAIG3 DD RD C GA 1104 1 L Road Grading Plan Sheet ( 4 of 15) 20.05.20 03.06.20 07.06.20 18 996 B KAIG3-DD-RD-C-0010 1

121 KAIG3 DD RD C GA 1105 0 Road Grading Plan Sheet ( 5 of 15) 22.04.20 06.05.20 13.05.20 21 1021 C KAIG3-DD-RD-C-0010 0 Hardcopy provided to DAR

122 KAIG3 DD RD C GA 1105 1 L Road Grading Plan Sheet ( 5 of 15) 20.05.20 03.06.20 07.06.20 18 996 B KAIG3-DD-RD-C-0010 1

123 KAIG3 DD RD C GA 1106 0 Road Grading Plan Sheet ( 6 of 15) 22.04.20 06.05.20 13.05.20 21 1021 C KAIG3-DD-RD-C-0010 0 Hardcopy provided to DAR

124 KAIG3 DD RD C GA 1106 1 L Road Grading Plan Sheet ( 6 of 15) 20.05.20 03.06.20 07.06.20 18 996 B KAIG3-DD-RD-C-0010 1

125 KAIG3 DD RD C GA 1107 0 Road Grading Plan Sheet ( 7 of 15) 22.04.20 06.05.20 13.05.20 21 1021 C KAIG3-DD-RD-C-0010 0 Hardcopy provided to DAR

126 KAIG3 DD RD C GA 1107 1 L Road Grading Plan Sheet ( 7 of 15) 20.05.20 03.06.20 07.06.20 18 996 B KAIG3-DD-RD-C-0010 1

127 KAIG3 DD RD C GA 1108 0 Road Grading Plan Sheet ( 8 of 15) 22.04.20 06.05.20 13.05.20 21 1021 C KAIG3-DD-RD-C-0010 0 Hardcopy provided to DAR

128 KAIG3 DD RD C GA 1108 1 L Road Grading Plan Sheet ( 8 of 15) 20.05.20 03.06.20 07.06.20 18 996 B KAIG3-DD-RD-C-0010 1

Page 100 of 111 M. Sarfraz


Consultant : DAR

Cancelled/ Total
Open Code A Code B Code C Code D
Superseded Received
Main Contractor : ZHBG

0 6 51 89 0 0 178
DESIGN DRAWING SUBMITTAL REGISTER (CIVIL) Sub Contractor :
Discipline : Composite Drawing
CIVIL TRANSPORTATION Rundate: 28-Feb-2023
Number of A B C D F
Latest Approval Average Days Number of
Sl No. Drawing Number Rev. Description Submitted Date Received Date Days with Submittal Reference Number Rev. Remarks
Rev. Required By Outstanding Days Held
ZHBG
129 KAIG3 DD RD C GA 1109 0 Road Grading Plan Sheet ( 9 of 15) 22.04.20 06.05.20 13.05.20 21 1021 C KAIG3-DD-RD-C-0010 0 Hardcopy provided to DAR

130 KAIG3 DD RD C GA 1109 1 L Road Grading Plan Sheet ( 9 of 15) 20.05.20 03.06.20 07.06.20 18 996 B KAIG3-DD-RD-C-0010 1

131 KAIG3 DD RD C GA 1110 0 Road Grading Plan Sheet ( 10 of 15) 22.04.20 06.05.20 13.05.20 21 1021 C KAIG3-DD-RD-C-0010 0 Hardcopy provided to DAR

132 KAIG3 DD RD C GA 1110 1 L Road Grading Plan Sheet ( 10 of 15) 20.05.20 03.06.20 07.06.20 18 996 B KAIG3-DD-RD-C-0010 1

133 KAIG3 DD RD C GA 1111 0 Road Grading Plan Sheet ( 11 of 15) 22.04.20 06.05.20 13.05.20 21 1021 C KAIG3-DD-RD-C-0010 0 Hardcopy provided to DAR

134 KAIG3 DD RD C GA 1111 1 L Road Grading Plan Sheet ( 11 of 15) 20.05.20 03.06.20 07.06.20 18 996 B KAIG3-DD-RD-C-0010 1

135 KAIG3 DD RD C GA 1112 0 Road Grading Plan Sheet ( 12 of 15) 22.04.20 06.05.20 13.05.20 21 1021 C KAIG3-DD-RD-C-0010 0 Hardcopy provided to DAR

136 KAIG3 DD RD C GA 1112 1 L Road Grading Plan Sheet ( 12 of 15) 20.05.20 03.06.20 07.06.20 18 996 B KAIG3-DD-RD-C-0010 1

137 KAIG3 DD RD C GA 1113 0 Road Grading Plan Sheet ( 13 of 15) 22.04.20 06.05.20 13.05.20 21 1021 C KAIG3-DD-RD-C-0010 0 Hardcopy provided to DAR

138 KAIG3 DD RD C GA 1113 1 L Road Grading Plan Sheet ( 13 of 15) 20.05.20 03.06.20 07.06.20 18 996 B KAIG3-DD-RD-C-0010 1

139 KAIG3 DD RD C GA 1114 0 Road Grading Plan Sheet ( 14 of 15) 22.04.20 06.05.20 13.05.20 21 1021 C KAIG3-DD-RD-C-0010 0 Hardcopy provided to DAR

140 KAIG3 DD RD C GA 1114 1 L Road Grading Plan Sheet ( 14 of 15) 20.05.20 03.06.20 07.06.20 18 996 B KAIG3-DD-RD-C-0010 1

141 KAIG3 DD RD C GA 1115 0 Road Grading Plan Sheet ( 15 of 15) 22.04.20 06.05.20 13.05.20 21 1021 C KAIG3-DD-RD-C-0010 0 Hardcopy provided to DAR

142 KAIG3 DD RD C GA 1115 1 L Road Grading Plan Sheet ( 15 of 15) 20.05.20 03.06.20 07.06.20 18 996 B KAIG3-DD-RD-C-0010 1

143 KAIG3 DD RD C GA 1201 0 Road Typical Cross Section (Sheet 1 of 10) 22.04.20 06.05.20 13.05.20 21 1021 C KAIG3-DD-RD-C-0010 0 Hardcopy provided to DAR

144 KAIG3 DD RD C GA 1201 1 L Road Typical Cross Section (Sheet 1 of 10) 20.05.20 03.06.20 07.06.20 18 996 B KAIG3-DD-RD-C-0010 1

145 KAIG3 DD RD C GA 1202 0 Road Typical Cross Section (Sheet 2 of 10) 22.04.20 06.05.20 13.05.20 21 1021 C KAIG3-DD-RD-C-0010 0 Hardcopy provided to DAR

146 KAIG3 DD RD C GA 1202 1 L Road Typical Cross Section (Sheet 2 of 10) 20.05.20 03.06.20 07.06.20 18 996 B KAIG3-DD-RD-C-0010 1

147 KAIG3 DD RD C GA 1203 0 Road Typical Cross Section (Sheet 3 of 10) 22.04.20 06.05.20 13.05.20 21 1021 C KAIG3-DD-RD-C-0010 0 Hardcopy provided to DAR

148 KAIG3 DD RD C GA 1203 1 L Road Typical Cross Section (Sheet 3 of 10) 20.05.20 03.06.20 07.06.20 18 996 B KAIG3-DD-RD-C-0010 1

149 KAIG3 DD RD C GA 1204 0 Road Typical Cross Section (Sheet 4 of 10) 22.04.20 06.05.20 13.05.20 21 1021 C KAIG3-DD-RD-C-0010 0 Hardcopy provided to DAR

150 KAIG3 DD RD C GA 1204 1 L Road Typical Cross Section (Sheet 4 of 10) 20.05.20 03.06.20 07.06.20 18 996 B KAIG3-DD-RD-C-0010 1

151 KAIG3 DD RD C GA 1205 0 Road Typical Cross Section (Sheet 5 of 10) 22.04.20 06.05.20 13.05.20 21 1021 C KAIG3-DD-RD-C-0010 0 Hardcopy provided to DAR

152 KAIG3 DD RD C GA 1205 1 L Road Typical Cross Section (Sheet 5 of 10) 20.05.20 03.06.20 07.06.20 18 996 C KAIG3-DD-RD-C-0010 1

153 KAIG3 DD RD C GA 1206 0 Road Typical Cross Section (Sheet 6 of 10) 22.04.20 06.05.20 13.05.20 21 1021 C KAIG3-DD-RD-C-0010 0 Hardcopy provided to DAR

154 KAIG3 DD RD C GA 1206 1 L Road Typical Cross Section (Sheet 6 of 10) 20.05.20 03.06.20 07.06.20 18 996 C KAIG3-DD-RD-C-0010 1

155 KAIG3 DD RD C GA 1207 0 Road Typical Cross Section (Sheet 7 of 10) 22.04.20 06.05.20 13.05.20 21 1021 C KAIG3-DD-RD-C-0010 0 Hardcopy provided to DAR

156 KAIG3 DD RD C GA 1207 1 L Road Typical Cross Section (Sheet 7 of 10) 20.05.20 03.06.20 07.06.20 18 996 C KAIG3-DD-RD-C-0010 1

157 KAIG3 DD RD C GA 1208 0 Road Typical Cross Section (Sheet 8 of 10) 22.04.20 06.05.20 13.05.20 21 1021 C KAIG3-DD-RD-C-0010 0 Hardcopy provided to DAR

158 KAIG3 DD RD C GA 1208 1 L Road Typical Cross Section (Sheet 8 of 10) 20.05.20 03.06.20 07.06.20 18 996 C KAIG3-DD-RD-C-0010 1

159 KAIG3 DD RD C GA 1209 0 Road Typical Cross Section (Sheet 9 of 10) 22.04.20 06.05.20 13.05.20 21 1021 C KAIG3-DD-RD-C-0010 0 Hardcopy provided to DAR

160 KAIG3 DD RD C GA 1209 1 L Road Typical Cross Section (Sheet 9 of 10) 20.05.20 03.06.20 07.06.20 18 996 C KAIG3-DD-RD-C-0010 1

161 KAIG3 DD RD C GA 1210 0 Road Typical Cross Section (Sheet 10 of 10) 22.04.20 06.05.20 13.05.20 21 1021 C KAIG3-DD-RD-C-0010 0 Hardcopy provided to DAR

162 KAIG3 DD RD C GA 1210 1 L Road Typical Cross Section (Sheet 10 of 10) 20.05.20 03.06.20 07.06.20 18 996 C KAIG3-DD-RD-C-0010 1

163 KAIG3 DD RD C GA 1300 0 L General Arrangement Road Marking and Signs Key Plan 27.06.20 11.07.20 05.07.20 8 968 B KAIG3-DD-RD-C-0021 0

164 KAIG3 DD RD C GA 1301 0 L General Arrangement Road Marking and Signs Plan (Sheet 1 of 15) 27.06.20 11.07.20 05.07.20 8 968 A KAIG3-DD-RD-C-0021 0

165 KAIG3 DD RD C GA 1302 0 L General Arrangement Road Marking and Signs Plan (Sheet 2 of 15) 27.06.20 11.07.20 05.07.20 8 968 B KAIG3-DD-RD-C-0021 0

166 KAIG3 DD RD C GA 1303 0 L General Arrangement Road Marking and Signs Plan (Sheet 3 of 15) 27.06.20 11.07.20 05.07.20 8 968 B KAIG3-DD-RD-C-0021 0

167 KAIG3 DD RD C GA 1304 0 L General Arrangement Road Marking and Signs Plan (Sheet 4 of 15) 27.06.20 11.07.20 05.07.20 8 968 B KAIG3-DD-RD-C-0021 0

168 KAIG3 DD RD C GA 1305 0 L General Arrangement Road Marking and Signs Plan (Sheet 5 of 15) 27.06.20 11.07.20 05.07.20 8 968 B KAIG3-DD-RD-C-0021 0

169 KAIG3 DD RD C GA 1306 0 L General Arrangement Road Marking and Signs Plan (Sheet 6 of 15) 27.06.20 11.07.20 05.07.20 8 968 B KAIG3-DD-RD-C-0021 0

170 KAIG3 DD RD C GA 1307 0 L General Arrangement Road Marking and Signs Plan (Sheet 7 of 15) 27.06.20 11.07.20 05.07.20 8 968 B KAIG3-DD-RD-C-0021 0

171 KAIG3 DD RD C GA 1308 0 L General Arrangement Road Marking and Signs Plan (Sheet 8 of 15) 27.06.20 11.07.20 05.07.20 8 968 A KAIG3-DD-RD-C-0021 0

Page 101 of 111 M. Sarfraz


Consultant : DAR

Cancelled/ Total
Open Code A Code B Code C Code D
Superseded Received
Main Contractor : ZHBG

0 6 51 89 0 0 178
DESIGN DRAWING SUBMITTAL REGISTER (CIVIL) Sub Contractor :
Discipline : Composite Drawing
CIVIL TRANSPORTATION Rundate: 28-Feb-2023
Number of A B C D F
Latest Approval Average Days Number of
Sl No. Drawing Number Rev. Description Submitted Date Received Date Days with Submittal Reference Number Rev. Remarks
Rev. Required By Outstanding Days Held
ZHBG
172 KAIG3 DD RD C GA 1309 0 L General Arrangement Road Marking and Signs Plan (Sheet 9 of 15) 27.06.20 11.07.20 05.07.20 8 968 B KAIG3-DD-RD-C-0021 0

173 KAIG3 DD RD C GA 1310 0 L General Arrangement Road Marking and Signs Plan (Sheet 10 of 15) 27.06.20 11.07.20 05.07.20 8 968 B KAIG3-DD-RD-C-0021 0

174 KAIG3 DD RD C GA 1311 0 L General Arrangement Road Marking and Signs Plan (Sheet 11 of 15) 27.06.20 11.07.20 05.07.20 8 968 A KAIG3-DD-RD-C-0021 0

175 KAIG3 DD RD C GA 1312 0 L General Arrangement Road Marking and Signs Plan (Sheet 12 of 15) 27.06.20 11.07.20 05.07.20 8 968 A KAIG3-DD-RD-C-0021 0

176 KAIG3 DD RD C GA 1313 0 L General Arrangement Road Marking and Signs Plan (Sheet 13 of 15) 27.06.20 11.07.20 05.07.20 8 968 A KAIG3-DD-RD-C-0021 0

177 KAIG3 DD RD C GA 1314 0 L General Arrangement Road Marking and Signs Plan (Sheet 14 of 15) 27.06.20 11.07.20 05.07.20 8 968 A KAIG3-DD-RD-C-0021 0

178 KAIG3 DD RD C GA 1315 0 L General Arrangement Road Marking and Signs Plan (Sheet 15 of 15) 27.06.20 11.07.20 05.07.20 8 968 A KAIG3-DD-RD-C-0021 0

179 44985

180 44985

181 44985

182 44985

183 44985

184 44985

185 44985

186 44985

187 44985

188 44985

189 44985

190 44985

191 44985

192 44985

193 44985

194 44985

195 44985

196 44985

197 44985

198 44985

199 44985

200 44985

201 44985

202 44985

203 44985

204 44985

205 44985

206 44985

207 44985

208 44985

209 44985

210 44985

211 44985

212 44985

213 44985

214 44985

Page 102 of 111 M. Sarfraz


Consultant : DAR

Cancelled/ Total
Open Code A Code B Code C Code D
Superseded Received
Main Contractor : ZHBG

0 6 51 89 0 0 178
DESIGN DRAWING SUBMITTAL REGISTER (CIVIL) Sub Contractor :
Discipline : Composite Drawing
CIVIL TRANSPORTATION Rundate: 28-Feb-2023
Number of A B C D F
Latest Approval Average Days Number of
Sl No. Drawing Number Rev. Description Submitted Date Received Date Days with Submittal Reference Number Rev. Remarks
Rev. Required By Outstanding Days Held
ZHBG
215 44985

216 44985

217 44985

218 44985

219 44985

220 44985

221 44985

222 44985

223 44985

224 44985

225 44985

226 44985

227 44985

228 44985

229 44985

230 44985

231 44985

232 44985

233 44985

Page 103 of 111 M. Sarfraz


Consultant : DAR

0
Cancelled/ Total
Open Code A Code B Code C Code D
Superseded Received
Main Contractor : ZHBG

Superseded / Cancelled
0 0 0 0 0 0 0 DESIGN DRAWING SUBMITTAL REGISTER (LANDSCAPE) Sub Contractor :

Drawing Submitted
Discipline : Landscape

For Information
LANDSCAPE-SOFT SCAPE

Under Review
Rundate: 28-Feb-2023
Drawing Number A B C D

Code A

Code B

Code C

Code D
Latest Approval Average Days Number of
Sl No. Rev. Description Submitted Date Received Date Submittal Reference Number Rev. Remarks
Rev. Required By Outstanding Days Held
Project Contracto Building Discpline Dwg No

1 13.01.00 44985

2 13.01.00 44985

3 13.01.00 44985

4 13.01.00 44985

5 13.01.00 44985

6 13.01.00 44985

7 13.01.00 44985

8 13.01.00 44985

9 13.01.00 44985

10 13.01.00 44985

11 13.01.00 44985

12 13.01.00 44985

13 13.01.00 44985

14 13.01.00 44985

15 13.01.00 44985

16 13.01.00 44985

17 13.01.00 44985

18 13.01.00 44985

19 13.01.00 44985

20 13.01.00 44985

Page 104 of 111 M. Sarfraz


Consultant : DAR

37

19

18
0

0
Cancelled/ Total
Open Code A Code B Code C Code D
Superseded Received
Main Contractor : ZHBG

Superseded / Cancelled
0 0 19 18 0 0 37 DESIGN DRAWING SUBMITTAL REGISTER (LANDSCAPE) Sub Contractor :

Drawing Submitted
Discipline : Landscape

For Information

Under Review
LANDSCAPE-HARDSCAPE Rundate: 28-Feb-2023
Drawing Number Number of A B C D

Code A

Code B

Code C

Code D
Latest Approval Average Days Number of
Sl No. Rev. Description Submitted Date Received Date Days with Submittal Reference Number Rev. Remarks
Rev. Required By Outstanding Days Held
Project Contracto Building Discpline Dwg No ZHBG

1 KAIG3 DD GN L GA 1000 0 L Overall Site Plan 02.03.20 16.03.20 07.03.20 5 1088 B KAIG3-DD-GN-LS-0002 0 1 1

2 KAIG3 DD GN L GA 1001 0 L Site Plan Part 1 02.03.20 16.03.20 07.03.20 5 1088 B KAIG3-DD-GN-LS-0002 0 1 1

3 KAIG3 DD GN L GA 1002 0 L Site Plan Part 2 02.03.20 16.03.20 07.03.20 5 1088 B KAIG3-DD-GN-LS-0002 0 1 1

4 KAIG3 DD GN L GA 1003 0 L Site Plan Part 3 02.03.20 16.03.20 07.03.20 5 1088 B KAIG3-DD-GN-LS-0002 0 1 1

5 KAIG3 DD GN L GA 1004 0 L Site Plan Part 4 02.03.20 16.03.20 07.03.20 5 1088 B KAIG3-DD-GN-LS-0002 0 1 1

6 KAIG3 DD GN L GA 1005 0 L Site Plan Part 5 02.03.20 16.03.20 07.03.20 5 1088 B KAIG3-DD-GN-LS-0002 0 1 1

7 KAIG3 DD GN L GA 1006 0 L Site Plan Part 6 02.03.20 16.03.20 07.03.20 5 1088 B KAIG3-DD-GN-LS-0002 0 1 1

8 KAIG3 DD GN L GA 1007 0 L Site Plan Part 7 02.03.20 16.03.20 07.03.20 5 1088 B KAIG3-DD-GN-LS-0002 0 1 1

9 KAIG3 DD GN L GA 1008 0 L Site Plan Part 8 02.03.20 16.03.20 07.03.20 5 1088 B KAIG3-DD-GN-LS-0002 0 1 1

10 KAIG3 DD GN L GA 1009 0 L Site Plan Part 9 02.03.20 16.03.20 07.03.20 5 1088 B KAIG3-DD-GN-LS-0002 0 1 1

11 KAIG3 DD GN L GA 1010 0 L Site Plan Part 10 02.03.20 16.03.20 07.03.20 5 1088 B KAIG3-DD-GN-LS-0002 0 1 1

12 KAIG3 DD GN L GA 1011 0 L Site Plan Part 11 02.03.20 16.03.20 07.03.20 5 1088 B KAIG3-DD-GN-LS-0002 0 1 1

13 KAIG3 DD GN L GA 1012 0 L Site Plan Part 12 02.03.20 16.03.20 07.03.20 5 1088 B KAIG3-DD-GN-LS-0002 0 1 1

14 KAIG3 DD GN L GA 1013 0 L Site Plan Part 13 02.03.20 16.03.20 07.03.20 5 1088 B KAIG3-DD-GN-LS-0002 0 1 1

15 KAIG3 DD GN L GA 1014 0 L Site Plan Part 14 02.03.20 16.03.20 07.03.20 5 1088 B KAIG3-DD-GN-LS-0002 0 1 1

16 KAIG3 DD GN L IR 1001 0 L Site General Arrangements Irrigation Layout Area A 17.01.21 31.01.21 20.01.21 3 769 C KAIG3-DD-GN-LS-0003 0 1 1

17 KAIG3 DD GN L IR 1002 0 L Site General Arrangements Irrigation Layout Area B 17.01.21 31.01.21 20.01.21 3 769 C KAIG3-DD-GN-LS-0003 0 1 1

18 KAIG3 DD GN L IR 1003 0 L Site General Arrangements Irrigation Layout Area C 17.01.21 31.01.21 20.01.21 3 769 C KAIG3-DD-GN-LS-0003 0 1 1

19 KAIG3 DD GN L IR 1004 0 L Site General Arrangements Irrigation Layout Area D 17.01.21 31.01.21 20.01.21 3 769 C KAIG3-DD-GN-LS-0003 0 1 1

20 KAIG3 DD GN L IR 1005 0 L Site General Arrangements Irrigation Layout Area E 17.01.21 31.01.21 20.01.21 3 769 C KAIG3-DD-GN-LS-0003 0 1 1

21 KAIG3 DD GN L IR 1006 0 L Site General Arrangements Irrigation Layout Area F 17.01.21 31.01.21 20.01.21 3 769 C KAIG3-DD-GN-LS-0003 0 1 1

22 KAIG3 DD GN L IR 1007 0 L Site General Arrangements Irrigation Layout Area G 17.01.21 31.01.21 20.01.21 3 769 C KAIG3-DD-GN-LS-0003 0 1 1

23 KAIG3 DD GN L IR 1008 0 L Site General Arrangements Irrigation Layout Area H 17.01.21 31.01.21 20.01.21 3 769 C KAIG3-DD-GN-LS-0003 0 1 1

24 KAIG3 DD GN L IR 1009 0 L Site General Arrangements Irrigation Layout Area I 17.01.21 31.01.21 20.01.21 3 769 C KAIG3-DD-GN-LS-0003 0 1 1

25 KAIG3 DD GN L IR 1010 0 L Site General Arrangements Irrigation Layout Area J 17.01.21 31.01.21 20.01.21 3 769 C KAIG3-DD-GN-LS-0003 0 1 1

26 KAIG3 DD GN L IR 1011 0 L Site General Arrangements Irrigation Layout Area K 17.01.21 31.01.21 20.01.21 3 769 C KAIG3-DD-GN-LS-0003 0 1 1

27 KAIG3 DD GN L IR 1012 0 L Site General Arrangements Irrigation Layout Area L 17.01.21 31.01.21 20.01.21 3 769 C KAIG3-DD-GN-LS-0003 0 1 1

28 KAIG3 DD GN L IR 1013 0 L Site General Arrangements Irrigation Layout Area M 17.01.21 31.01.21 20.01.21 3 769 C KAIG3-DD-GN-LS-0003 0 1 1

29 KAIG3 DD GN L IR 1014 0 L Site General Arrangements Irrigation Layout Area N 17.01.21 31.01.21 20.01.21 3 769 C KAIG3-DD-GN-LS-0003 0 1 1

30 KAIG3 DD GN L IR 1015 0 L Site General Arrangements Irrigation Layout Area O 17.01.21 31.01.21 20.01.21 3 769 C KAIG3-DD-GN-LS-0003 0 1 1

31 KAIG3 DD GN L IR 7001 0 L Site General Arrangements Irrigation Details 17.01.21 31.01.21 20.01.21 3 769 C KAIG3-DD-GN-LS-0003 0 1 1

32 KAIG3 DD GN L IR 8001 0 L Site General Arrangements Irrigation Run-Time Schedule 17.01.21 31.01.21 20.01.21 3 769 C KAIG3-DD-GN-LS-0003 0 1 1

33 KAIG3 DD SW L IR 1001 0 L Reverse Osomosis Water (ROW) Irrigation Mainline Network 24.07.21 07.08.21 27.07.21 3 581 C KAIG3-DD-SW-LS-0004 0 1 1

Smart Irrigation System for Site Wide Gardens & Toilet


34 KAIG3 DD GN L IR 1030 0 L 10.04.22 24.04.22 26.04.22 16 308 B KAIG3-DD-GN-LS-0005 0 1 1
Flushing

35 KAIG3 DD GN L IR 1031 0 L Smart Irrigation System for External & Internal Gardens 10.04.22 24.04.22 26.04.22 16 308 B KAIG3-DD-GN-LS-0005 0 1 1

36 KAIG3 DD GN L IR 7006 0 L Smart Irrigation System Typical Installation Details 10.04.22 24.04.22 26.04.22 16 308 B KAIG3-DD-GN-LS-0005 0 1 1

37 KAIG3 DD GN L IR 9001 0 L Smart Irrigation System Single Line Diagr 10.04.22 24.04.22 26.04.22 16 308 B KAIG3-DD-GN-LS-0005 0 1 1

38 13.01.00 44985 44985

39 13.01.00 44985 44985

40 13.01.00 44985 44985

41 44985

42 44985

43 44985

44 44985

45 44985

46 44985

47 44985

48 44985

49 44985

50 44985

51 44985

52 44985

53 44985

54 44985

55 44985

56 44985

57 44985 44985

58 44985 44985

59 44985 44985

60 44985 44985

61 44985 44985

62 44985 44985

63 44985 44985

64 44985 44985

65 44985 44985

66 44985 44985

67 44985 44985

68 44985

Page 105 of 111 M. Sarfraz


Consultant : DAR

Cancelled/ Total
Open Code A Code B Code C Code D
Superseded Received
Main Contractor : ZHBG

0 0 0 0 0 0 0 DESIGN DRAWING SUBMITTAL REGISTER (GEN) Sub Contractor :


Discipline : Landscape
Rundate: 28-Feb-2023
Drawing Number A B C D
Latest Approval Average Days Number of
Sl No. Rev. Description Submitted Date Received Date Submittal Reference Number Rev. Remarks
Rev. Required By Outstanding Days Held
Project BLG COD CONT TYPE Dwg No

1 13.01.00 44985

13.01.00 44985

13.01.00 44985

2 13.01.00 44985

3 13.01.00 44985

4 13.01.00 44985

5 13.01.00 44985

6 13.01.00 44985

7 13.01.00 44985

8 13.01.00 44985

9 13.01.00 44985

10 13.01.00 44985

11 13.01.00 44985

12 13.01.00 44985

13 13.01.00 44985

14 13.01.00 44985

15 13.01.00 44985

16 13.01.00 44985

17 13.01.00 44985

18 13.01.00 44985

19 13.01.00 44985

20 13.01.00 44985

21 13.01.00 44985

44985

44985

44985

44985

44985

44985

44985

44985

44985

44985

Page 106 of 111 M. Sarfraz


Consultant : DAR

Cancelled/ Total
Open Code A Code B Code C Code D
Superseded Received
Main Contractor : ZHBG

0 0 0 0 0 0 0 DESIGN DRAWING SUBMITTAL REGISTER (GEN) Sub Contractor :


Discipline : Landscape
Rundate: 28-Feb-2023
Drawing Number A B C D
Latest Approval Average Days Number of
Sl No. Rev. Description Submitted Date Received Date Submittal Reference Number Rev. Remarks
Rev. Required By Outstanding Days Held
44985

44985

44985

44985

44985

44985

44985

44985

44985

44985

44985

44985

44985

44985

44985

44985

44985

44985

44985

44985

44985

44985

44985

44985

44985

44985

44985

44985

44985

44985

44985

44985

44985

44985

Page 107 of 111 M. Sarfraz


Consultant : DAR

Cancelled/ Total
Open Code A Code B Code C Code D
Superseded Received
Main Contractor : ZHBG

0 0 0 0 0 0 0 DESIGN DRAWING SUBMITTAL REGISTER (GEN) Sub Contractor :


Discipline : Landscape
Rundate: 28-Feb-2023
Drawing Number A B C D
Latest Approval Average Days Number of
Sl No. Rev. Description Submitted Date Received Date Submittal Reference Number Rev. Remarks
Rev. Required By Outstanding Days Held
44985

#REF! 44985

#REF! 44985

#REF! 44985

#REF! 44985

#REF! 44985

#REF! 44985

#REF! 44985

#REF! 44985

#REF! 44985

#REF! 44985

#REF! 44985

#REF! 44985

#REF! 44985

#REF! 44985

#REF! 44985

#REF! 44985

#REF! 44985

#REF! 44985

#REF! 44985

#REF! 44985

#REF! 44985

#REF! 44985

#REF! 44985

#REF! 44985

#REF! 44985

44985

#REF! 44985

#REF! 44985

#REF! 44985

#REF! 44985

#REF! 44985

#REF! 44985

#REF! 44985

Page 108 of 111 M. Sarfraz


Consultant : DAR

Cancelled/ Total
Open Code A Code B Code C Code D
Superseded Received
Main Contractor : ZHBG

0 0 0 0 0 0 0 DESIGN DRAWING SUBMITTAL REGISTER (GEN) Sub Contractor :


Discipline : Landscape
Rundate: 28-Feb-2023
Drawing Number A B C D
Latest Approval Average Days Number of
Sl No. Rev. Description Submitted Date Received Date Submittal Reference Number Rev. Remarks
Rev. Required By Outstanding Days Held
#REF! 44985

#REF! 44985

#REF! 44985

#REF! 44985

#REF! 44985

Page 109 of 111 M. Sarfraz


KAIG PROJECT
DESIGN DRAWING SUBMITTAL SUMMARY

Run Date: 28-Feb-23

Civil-Trasnportation
Civil-Environmental
Electrical-Power

Mech-Plumbing

Civil-Hydrology
Civil-Earthwork

Landscape-HS
Landscape-SS
Str. Concrete

Civil-General
Architectural

Electrical-LC

Mech-HVAC
Mechanical
Str. Steel

Total
GEN
A Design Drawings
Total No. of Planned Submittals
No. of Drawings Submitted 0 0 154 1273 722 481 0 84 0 296 0 0 178 0 37 0 3225
Total No. of Drawings Approved ( A & B ) 0 0 77 723 445 146 0 38 0 129 0 0 57 0 19 0 1634
Drawings not Approved ( C ) 0 0 74 519 272 178 0 0 0 125 0 0 89 0 18 0 1275
Rejected/Cacelled ( D ) 0 0 0 1 0 0 0 0 0 32 0 0 0 0 0 0 33
Code N/A 0 0 98
For Information Only 0 0 2 0 0 0 0 0 0 0 0 0 32 0 0 0 34
Drawings Under Review with DAR 0 0 0 6 4 0 0 0 0 0 0 0 0 0 0 0 10

Shop Drawings Status


Code A 0 0 0 39 0 0 0 0 0 9 0 0 6 0 0 0 54
Code B 0 0 77 684 445 146 0 38 0 120 0 0 51 0 19 0 1580
Code C 0 0 74 519 272 178 0 0 0 125 0 0 89 0 18 0 1275
Code D 0 0 0 1 0 0 0 0 0 32 0 0 0 0 0 0 33
Code N/A 0 0 98 98
For Information 0 0 2 0 0 0 0 0 0 0 0 0 32 0 0 0 34
Supersede/Cancelled 0 0 1 24 0 59 0 46 0 10 0 0 0 0 0 0 140
Under Review with DAR 0 0 0 6 4 0 0 0 0 0 0 0 0 0 0 0 10
Total 0 0 154 1273 721 481 0 84 0 296 0 0 178 0 37 0 3224
More than 14 days with the consultant 0 0 66 447 545 137 0 0 0 16 0 0 106 0 4 0 1321

Status Code:
A- Approved No Comments Sarfraz
B- Approved As Noted
C- Not Approved - Revise
Civil-Trasnportation
Civil-Environmental
Electrical-Power

Mech-Plumbing

Civil-Hydrology
Civil-Earthwork

Landscape-HS
Landscape-SS
Str. Concrete

Civil-General
Architectural

Electrical-LC

Mech-HVAC
Mechanical
Str. Steel

Total
GEN
A Design Drawings
No. of Drawings Submitted 0 0 154 1273 722 481 0 84 0 296 0 0 178 0 37 0 3225
More than 14 days with the consultant 0 0 66 447 545 137 0 0 0 16 0 0 106 0 4 0 1321

Status Code:
A- Approved No Comments Sarfraz
B- Approved As Noted
C- Not Approved - Revise